United States      Office of Air Quality       EPA-340/1-85-014c
               Environmental Protection  Planning and Standards      October 1984
               Agency         Washington, D.C. 20460
               Stationary Source Compliance Series	
               Utility  FGD Survey
               October  1983-
               September 1984

               Volume 2: Design
               Performance  Data
               For Operating
               FGD Systems (Part 2)
                               Property Of
                               EPA Librc.-y
                              RTPNC 27711
EPA LIBRARY SERVICES RTP NC

EPA3HO/i-85-oi4c
TECHNICAL DOCUMENT COLLECTION

-------
                                  EPA-340/1 -85-014c


             Utility FGD Survey
   October 1983 - September 1984

Volume 2:  Design  Performance Data for
     Operating FGD Systems (Part 2)

        Montana Power, Colstrip 3 through
          West Penn Power, Mitchell 33
                 M. T. Melia, R. S. McKibben,
                    and B. W. Pelsor
                 PEDCo Environmental, Inc.
                   11499 Chester Road
                  Cincinnati, Ohio 45246
                 EPA Contract No. 68-02-3963
                  Work Assignment No. 46
                EPA Project Manager: John Busik
          EPA Work Assignment Manager: Sonya M. Stelmack
            U.S. ENVIRONMENTAL PROTECTION AGENCY
              Stationary Source Compliance Division
             Office of Air Quality Planning and Standards
                  Washington, D.C. 20460

                     October 1984

-------
                         ACKNOWLEDGMENT
     The EPA-SSCD Project Officer and authors of this report
appreciate the assistance provided by Norman Kaplan, the Project
Officer for the U.S. Environmental Protection Agency  (Industrial
Environmental Research Laboratory, Research Triangle Park, North
Carolina) for the Flue Gas Desulfurization Information System
(FGDIS), in updating and maintaining the data base and his sug-
gestions on the content and format of the survey report  (and
project summary) and on other project activities.
                           DISCLAIMER


     This report was prepared for the U.S. Environmental Protec-
tion Agency by PEI Associates, Inc., Cincinnati, Ohio, under Con-
tract No. 68-02-3963, Work Assignment No. 46.  The contents of
this report are reproduced herein as received from PEI Associates,
Inc.  The opinions, findings, and conclusions expressed are those
of the authors and not necessarily  those of the U.S. Environmental
Protection Agency.  Mention of trade names or commercial products
is not intended to constitute endorsement or recommendation for
use.  Copies of this report are available from the National
Technical Information Services, 5285 Port Royal Road, Springfield,
Virginia 22161.
                               11

-------
                              NOTICE
     The data  in  this  information  transfer  document  are  supplied
voluntarily by utility representatives,  flue  gas  desulfurization
 (FGD)  system suppliers and  designers,  regulatory  agencies,  and
others.  The accuracy  or  completeness  of the  information con-
tained herein  is  not warranted  by  the  Stationary  Source  Control
.Division of EPA or  the designated  contractor.   Portions  of  the
work upon which this publication is  based were  performed pursuant
to Contract Nos.  RP982-32 (Electric  Power Research Institute)  and
68-02-3173  (Environmental Protection Agency).

     A project summary will be  distributed  to organizations and
individuals indicating a  specific  interest  in the field  of  FGD
technology.  Interested parties can  be added  to the  Project
Summary mailing list by contacting Carolyn  Fowler at the Indus-
trial  Environmental Research Laboratory  (919/541-2915) or the
secretary of the  Emission and Effluent Technology Branch of the
EPA  (919/541-2578).  Copies of  preceding issues of this  report
through December  1981  can be purchased from the National Tech-
nical  Information Service,  Springfield,  Virginia  22161,  (703)
487-4650.  Succeeding  issues of this report can be purchased from
the Electric Power  Research Institute  Research  Reports Center,
P.O. Box 50490, Palo Alto,  California  94303,  (415) 965-408-1.

     This report  summarizes the FGD  system  design and performance
data contained in a computerized data  base  known  as  the  Flue Gas
Desulfurization Information System (FGDIS).   Access  to the  FGDIS
is available through the  National  Technical Information  Service
 (NTIS) for a nonprofit user's fee.   Users also  have  access  to
additional design and  performance  data stored within the data
base that cannot  conveniently be printed in this  report.  Direct
access to the  data  base affords analyses of the data (e.g.,
averages, maxima, minima, and standard deviations of various
parameters), the  use of simple  mathematical functions, the  capa-
bility of virtually unlimited data cross-referencing, and data
tabulation to  fit the  user's individual  information  needs.   An
FGDIS  users manual  is  available from NTIS (NTIS No.  PB 83 146
209) .

     Requests  for further information  concerning  the FGDIS  and
periodic FGDIS training seminars should  be  directed  to Michael
Melia  or Skip  Jones, PEI  Associates, Inc. (513/782-4700).  In-
formation concerning access to  che FGDIS can  be obtained from
Walter Finch,  NTIS, 5285  Port Royal  Road, Springfield, Virginia
22161  (703/487-4808).

                                iii

-------
                       USE OF THIS REPORT


     This report is the first fully compiled edition since the
July 1982-March 1983 issue released in April 1984, which contains
more complete design and performance data since the FGS system
startup dates.  This report supersedes all previous issues.
Volume 1 includes several categorical summaries of key data and
the appendix sections.  Volume 2, Parts 1 and 2 contain all
available design and performance data for operational FGD systems
(Section 13).

     The Executive Summary contains the number and capacity of
FGD systems as of the end of December 1984, future (December 1993)
projections of controlled and uncontrolled generating capacity,
and unit-by-unit summaries of status changes (e.g., contract
awarded, under construction, or operational) and performance and
status highlights for the period.

     Appendix sections include definitions, a table of unit
notation and simplified process flow diagrams,  as well as data
on terminated FGD systems, particle scrubbers and Japanese FGD
systems.
                               IV

-------
                            ABSTRACT


     The Utility FGD Survey report, which is generated by a
computerized data base system, represents a survey of operational
and planned domestic utility flue gas desulfurization (FGD)
systems.  The three volume set summarizes information contributed
by the utility industry, system and equipment suppliers, system
designers, research organizations, and regulatory agencies.   The
data cover system design, fuel characteristics, operating
history, and actual system performance.  Also included is a
unit-by-unit discussion of problems and solutions associated with
the boilers, scrubbers, and FGD systems.

     The development status (operational, under construction, or
in the planning stages), system supplier, process, waste disposal
practice, and regulatory class are tabulated alphabetically by
utility company.  Simplified process flow diagrams of FGD systems,
definitions, and a glossary of terms are attached to the report.
Current data for domestic FGD systems show 124 systems in opera-
tion, 25 systems under construction, and 68 systems planned.  The
current FGD-controlled capacity in the United States is 47,255 MW.

-------
                            CONTENTS
Acknowledgment
Notice
Use of This Report
Abstract
Section 13
(continued)
Design and Performance Data for Opera-
  tional Domestic FGD Systems

Alabama Electric
  Tombigbee 2
  Tombigbee 3
Arizona Electric Power
  Apache 2
  Apache 3
Arizona Public Service
  Cholla 1
  Cholla 2
  Cholla 4
  Four Corners 1
  Four Corners 2
  Four Corners 3.
Associated Electric
  Thomas Hill 3
Basin Electric Power
  Antelope Valley 1
  Laramie River 1
  Laramie River 2
  Laramie River 3
Big Rivers Electric
  D.B. Wilson 1
  Green 1
  Green 2
Central Illinois Light
  Duck Creek 1
Central Illinois Public Service
  Newton 1
Cincinnati Gas & Electric
  East Bend 2
Colorado Ute Electric
  Craig 1
  Craig 2
  Craig 3
                               VI
                                               11
                                              iii
                                               iv
                                                v
                                                           13-1
                                                           13-14

                                                           13-27
                                                           13-42

                                                           13-56
                                                           13-76
                                                           13-84
                                                           13-89
                                                           13-96
                                                           13-103

                                                           13-110

                                                           13-118
                                                           13-122
                                                           13-137
                                                           13-148

                                                           13-153
                                                           13-156
                                                           13-168

                                                           13-179

                                                           13-202

                                                           13-216

                                                           13-225
                                                           13-240
                                                           13-257

-------
                     CONTENTS  (continued)
              Columbus & Southern Ohio Electric
                Conesville 5                              13-260
                Conesville 6                              13-278
              Cooperative Power Association
                Coal Creek 1                              13-293
                Coal Creek 2                              13-304
              Delmarva Power & Light
                Delaware City 1                           13-313
                Delaware City 2                           13-323
                Delaware City 3                           13-333
              Deseret Gen & Trans
                Bonanza 1                                 13-343
              Duquesne Light
                Elrama 1-4                                13-346
                Phillips 1-6           •                   13-366
              East Kentucky Power
                Spurlock 2                                13-392
              Grand Haven Board of Light and Power
                J.B. Sims 3                               13-397
              Hoosier Energy
                Merom 1                                   13-402
                Merom 2                                   13-410
              Houston Lighting and Power
                W. A. Parish 8                            13-420
              Indianapolis Power & Light
                Petersburg 3                              13-427
              Kansas City Power & Light
                La Cygne 1                                13-440
              Kansas Power & Light
                Jeffrey 1                                 13-470
                Jeffrey 2                                 13-479
                Jeffrey 3                                 13-487
                Lawrence 4                                13-492
                Lawrence 5                                13-506
              Kentucky Utilities
                Green River 1-3                           13-520
              Lakeland Utilities
                Mclntosh 3                                13-533
              Louisville Gas & Electric
                Cane Run 4                                13-540
                Cane Run 5                                13-554
                Cane Run 6                                13-565
                Mill Creek 1                              13-574
                Mill Creek 2                              13-582
                Mill Creek 3                              13-589
                Mill Creek 4                              13-600
                Paddy's Run 6                             13-606
(continued)

                              vii

-------
                      CONTENTS (continued)
               Marquette Board of Light and Power
                 Shiras 3                                 13-621
               Michigan South Central Power Agency
                 Project 1                                13-625
               Minnesota Power & Light
                 Clay Boswell 4                           13-630
               Minnkota Power
                 Milton R. Young 2                        13-641
               Monongahela Power
                 Pleasants 1                              13-662
                 Pleasants 2                              13-672
               Montana Power
                 Colstrip 1                               13-680
                 Colstrip 2                               13-691
                 Colstrip 3                               13-702
               Montana-Dakota Utilities
                 Coyote 1                                 13-706
               Muscatine Power & Water
                 Muscatine 9                              13-712
               Nevada Power
                 Reid Gardner 1                           13-717
                 Reid Gardner 2                           13-739
                 Reid Gardner 3                           13-764
                 Reid Gardner 4                           13-784
               New York State Electric & Gas
                 Somerset 1                               13-789
               Niagara Mohawk Power
                 Charles R. Huntley 66                    13-792
               Northern Indiana Public Service
                 Schahfer 17                              13-797
               Northern States Power
                 Riverside 6-7                            13-801
                 Sherburne 1                              13-808
                 Sherburne 2                              13-828
               Pacific Power & Light
                 Jim Bridger 4                            13-844
               Pennsylvania Power
                 Bruce Mansfield 1                        13-852
                 Bruce Mansfield 2                        13-873
                 Bruce Mansfield 3                        13-888
               Philadelphia Electric
                 Cromby 1                                 13-899
                 Eddystone 1                              13-904
                 Eddystone 2                              13-908
               Platte River Power Authority
                 Rawhide 1                                13-912
(continued)

                               viii

-------
                     CONTENTS  (continued)
              Public  Service of Indiana
                Gibson 5
              Public  Service of New Mexico
                San Juan I
                San Juan 2
                San Juan 3
                San Juan 4
              Salt River Project
                Coronado 1
                Coronado 2
              San Miguel Electric
                San Miguel 1
              Seminole Electric
                Seminole 1
                Seminole 2
              Sikeston Board of Municipal Utilities
                Sikeston 1
              South Carolina Public Service
                Cross 2
                Winyah 2
                Winyah 3
                Winyah 4
              South Mississippi Electric Power
                R. D. Morrow, Sr. 1
                R. D. Morrow, Sr. 2
              Southern Illinois Power
                Marion 4
              Southern Indiana' Gas & Electric
                A. B. Brown 1
              Springfield City Utilities
                Southwest 1
              Springfield Water, Light & Power
                Dallman 3
              Sunflower Electric
                Holcomb 1
              Tennessee Valley Authority
                Paradise  1
                Paradise  2
                Widows Creek 7
                Widows Creek 8
              Texas  Municipal Power Agency
                Gibbons Creek  1
              Texas  Power & Light
                Sandow  4
              Texas  Utilities
                Martin  Lake  1
                Martin  Lake  2
13-916

13-926
13-944
13-962
13-976

13-985
13-993

13-1000

13-1007
13-1012

13-1016

13-1023
13-1027
13-1042
13-1055

13-1065
13-1079

13-1093

13-1106

13-1121

13-1145

13-1159

13-1164
13-1169
13-1174
13-1180

13-1198

13-1204

13-1210
13-1222
(continued)
                               IX

-------
       CONTENTS (continued)
  Martin Lake 3
  Monticello 3
United Power Association
  Stanton 1A
Utah Power & Light
  Hunter 1
  Hunter 2
  Hunter 3
  Huntington 1
  Naughton 3
West Penn Power
  Mitchell 33
13-1233
13-1243

13-1253

13-1258
13-1269
13-1279
13-1283
13-1296

13-1301
                 x

-------
             SECTION 13

       DESIGN AND PERFORMANCE
FOR OPERATIONAL DOMESTIC FGD SYSTEMS

      MONTANA POWER, COLSTRIP 3
               THROUGH
    WEST PENN POWER, MITCHELL 33

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M
               (  .050 LB/MMBTU)
               (  .180 LB/MMBTU)
               (****** LB/MMBTU)
                                               MONTANA  POWER
                                               COLSTRIP
                                               3
                                               COLSTRIP
                                               MONTANA
                                               A
                                                  21.
                                                  77.
                                               ******
                                                  778
                                                  778
                                                  700
                                                  495
                                                  778
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
********       (****#** ACFM)
               (**** F)
               (  692 FT)
                                               *******
                                                  211.
                                               CONCRETE
                                                    7.3
 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE  HEAT CONTENT  -  J/G
    .RANGE HEAT  CONTENT  -  BTU/LB
     AVERAGE  ASH CONTENT - X
     RANGE ASH CONTENT - X
     AVERAGE  MOISTURE CONTENT - X
     RANGE MOISTURE CONTENT  - X
     AVERAGE  SULFUR CONTENT  - X
     RANGE SULFUR CONTENT  -  X
     AVERAGE  CHLORIDE CONTENT - X
     RANGE CHLORIDE CONTENT  - X

*** PARTICLE  CONTROL

 ** PARTICLE  SCRUBBER
     NUMBER
     GENERIC  TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY  PRODUCT
     SOa REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETPCFIT
     UNIT DESIGN PARTICLE  REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP                           10/83
     CONTRACT AWARDED                            0/79
                                                COAL
                                                ******
                                                19771.

                                                    8.50
                                                7-11
                                                   25.00
                                                ******
                                                      .70
                                                .4-1.0
                                                ********
                                                ******
                                                  0
                                                NONE
                                                N/A
                                                N/A
                                                N/A
                                                N/A
                                                N/A
                                                N/A
                                                N/A
                                                THROWAWAY PRODUCT
                                                WET SCRUBBING
                                                LIME/ALKALINE FLYASH
                                                BECHTEL/MONTANA  POWER
                                                BECHTEL
                                                FULL  SCALE
                                                NEW
                                                7.   99.60
                                                   95.00
                                                  1
                                                               ( 24.0 FT)
               (   8500 BTU/LB)
                8140-8800
                                             13-702

-------
MONTANA POWER: COLSTRIP 3 (CONT.)
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
 ** DESIGN AND OPERATING PARAMETERS

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     L/G RATIO - L/CU.M
     SOS REMOVAL EFFICIENCY - X
     PARTICLE REMOVAL EFFICENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     TEMPERATURE INCREASE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 *» DUCTWORK
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 «* REAGENT PREPARATION  EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
NR
NR
 8
 1
COMBINATION TOMER
VENTURI/SPRAY
N/A
NR
NR
NR
NR
NR
NR
VALVE TRAYS
    4.7
   95.7
   99.5
(  35.0 GAL/1000 ACF)
PRIMARY COLLECTOR
 1
IMPINGEMENT
MESH
KNITTED WIRE MESH PAD
NR
NR
IN-LINE
STEAM
NR
   27.8        (    50 F)
NR
NR
CENTRIFUGAL
UNIT
INDUCED DRAFT
DRY
CARBON STEEL; ORGANIC
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
SLAKER
NR
NR
                                            13-703

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

MONTANA POWER: COLSTRIP 3 (CONT.)
 ** PUMPS
     SERVICE
     NA
 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE

*** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 «* DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TREATMENT

 ** WATER BALANCE
     WATER LOOP TYPE

 ** CHEMICALS  AND CONSUMPTION
     FUNCTION
     NAME
     PRINCIPAL CONSTITUENT
                                               NUMBER

                                               ****


                                               NA
                                               FORCED OXIDATION
                                               OXIDATION TANK
                                               N/A
                                               FINAL
                                               POND
                                               ON-SITE
                                               CLAY LINING
                                               CLOSED
                                               ABSORBENT
                                               OOLOMITIC PROMOTED  LIME
                                               40X MGC03, 60X CAC03
 	PERFORMANCE DATA	
 PERIOD  MODULE  AVAILABILITY  OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL    PER  BOILER   FGD    CAP.
                                                                S02   PART. HOURS HOURS   HOURS  FACTOR
 10/83  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
                                                                             744
                          THE  UTILITY  REPORTED  THAT  INITIAL START-UP OF THE  FGD SYSTEM  AT  COLSTRIP
                          3 OCCURRED DURING  OCTOBER  1983.  COMMERCIAL START-UP IS  SCHEDULED  FOR
                          JANUARY  1, 1984.
                                                                              720

                                                                              744
                                                                              696
                                                                              720
11/83  SYSTEM

12/83  SYSTEM

 1/84  SYSTEM

 2/84  SYSTEM

 3/84  SYSTEM

 4/84  SYSTEM

 5/84  SYSTEM

 6/84  SYSTEM

 7/84  SYSTEM

       ** FROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED FOR JANUARY THROUGH JULY 1984.

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720
                                                                              720
                                             13-704

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

MONTANA POWER: COLSTRIP 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S03  PART. HOURS HOURS  HOURS FACTOR


       ** PROSLEMS/SOLUTIONS/COMMENTS

                         INFORMATION MAS UNAVAILABLE FOR AUGUST AND SEPTEMBER 1984.
                                             13-705

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW
MONTANA-DAKOT/
COYOTE
1
BEULAH
NORTH DAKOTA
0
43.
516.
******
*****
440
400
405
440
I UTILITIES



( .100 LB/MMBTU)
( 1.200 LB/MMBTU)
(****** LB/MMBTU)





 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT  - 7.
     RANGE MOISTURE CONTENT -  7.
     AVERAGE SULFUR CONTENT -  7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT  - 7.
     RANGE CHLORIDE CONTENT -  7.

 ***  PARTICLE CONTROL

  **  FABRIC FILTER
     NUMBER
     TYPE
     SUPPLIER
     NUMSER  OF  COMPARTMENTS
      PRESSURE DROP  -  KPA
     TYPICAL GAS/CLOTH RATIO - M/MIN

  **  PARTICLE SCRU5BER
     NUMBER
     GENERIC TYPE
      SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC  MATERIAL
      SHELL SPECIFIC MATERIAL
      LINER GENERIC  MATERIAL
      LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

 ***  FGD SYSTEM

  **  GENERAL  DATA
      SALEABLE  PRODUCT/THROWAWAY  PRODUCT
      S02 REMOVAL MODE
      PROCESS TYPE
     SYSTEM  SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
BABCOCK t WILCOX
CYCLONE
BASE
  891.89
  140.6
               (1890000 ACFM)
               (  285 F)
               (**** FT)

               (***** FT)
               (  7050 BTU/LB)
                ******
CONCRETE
*******
COAL
LIGNITE
16398.

    6.50
******
   35.00
******
     .87
******
********
******
SHAKE/DEFLATE
WHEELABRATOR-FRYE
  38
      .7        ( 3.0 IN-H20)
      .9        (  2.8 FT/MIN)
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
THROWAWAY PRODUCT
SPRAY DRYING
SODIUM CARBONATE/SPRAY DRYING
WHEELABRATOR-FRYE/R.I.
BECHTEL
FULL SCALE
                                             13-706

-------
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SFPTEMBER 198*
MONTANA-DAKOTA UTILITIES: COYOTE 1 (CONT.)

     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     SPACE REQUIREMENTS - SQ M
     OPER. t MAINT. REQUIREMENT - MANHR/DAY

 »* QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 »» ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X
     PARTICLE REMOVAL EFFICENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 »* REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 »* DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
                (   37000 SQ FT)
 NEW
X   99.50
    70.00
     1.1
  1
  5/81
  4/81
 12/77
3*37.3
  72.0
 NR
 NR
 SPRAY DRYER
 COCURRENT
 ROTARY ATOMIZER
 ATOMICS INTERNATIONAL
 *6 FT DIAMETER
 CARBON STEEL
 NA
 NA
 NONE
 N/A
 N/A
 NONE
  3
   140.6        (   285 F)
    75.0
    99.0
 NONE
 N/A
 N/A
 N/A
 NR
 NR
 NONE
 N/A
 N/A
 NONE
 N/A
 NR
 NR
 INDUCED DRAFT
 DRY
 CARBON STEEL
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
                                            13-707

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

MONTANA-DAKOTA UTILITIES: COYOTE 1 (CONT.)
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 ** PUMPS
     SERVICE
     NR
  **  SOLIDS CONCENTRATING/DEWATERING
      DEVICE

 ***  SLUDGE

  *»  TREATMENT
      METHOD
      DEVICE
      PROPRIETARY  PROCESS

  **  DISPOSAL
      NATURE
      TYPE
      SITE TREATMENT
                      NR
                      NR
                      MIX TANK
                      N/A
                      AGITATED TANK
                      NUMBER

                      ****


                      NONE
                       N/A
                       N/A
                       N/A
                       FINAL
                       LANDFILL
                       CLAY LINED
 	PERFORMANCE DATA	
 PERIOD MODULE  AVAILABILITY  OPERABILITY RELIABILITY UTILIZATION  Y. REMOVAL    PER  BOILER   FGO    CAP.
                                                                S02   PART. HOURS HOURS   HOURS FACTOR
  4/81  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
                                                                              720
  5/81  SYSTEM
  6/81  SYSTEM
                          INITIAL START-UP AND  SHAKEDOWN  PROCEDURES  OF  THE  DRY  SCRUBBING FGD SYSTEM
                          COMMENCED  IN APRIL.

                                                                             744
                                                                              720
        ** PROBLEMS/SOLUTIONS/COMMENTS
  7/81  SYSTEM

  8/81  SYSTEM

  9/81  SYSTEM
DURING THE SECOND QUARTER 1981 THE UNIT WAS FOR MOST PART OFF-LINE DUE TO
BOILER TUBE LEAKS, VARIOUS EQUIPMENT TRIPS, CIRCUIT BREAKER WAS HIT BY
LIGHTNING, AND SCHEDULED OUTAGE FOR A BOILER/TURBINE INSPECTION.

SINCE START-UP, HIGH TEMPERATURE AND PLUGGING HAVE BEEN ENCOUNTERED WITH
THE DRY SCRUBBER.  PRESENTLY, VARIOUS MODIFICATIONS ARE BEING TESTED TO
REMEDY THESE PROBLEMS.  THESE VARIOUS PROBLEMS CONTRIBUTED TO THE DOWNTIME
OF THE SYSTEM.

UTILITY ALSO REPORTED HAVING PROBLEMS WITH FAN BLADE EROSION.

                                                    744

                                                    744

                                                    720
                                             13-708

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

MONTANA-DAKOTA UTILITIES: COYOTE 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       «* PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE THIRD QUARTER 1981, THIS SPRAY DRYER FGD SYSTEM OPERATED ON A
                         LIMITED BASIS ONLY, PRIMARILY AS A RESULT OF EXCESSIVE ASH BUILDUP IN THE
                         SPRAY DRYER COMPARTMENT. OTHER PROBLEMS REPORTED DURING THE QUARTER
                         INCLUDED FAILURE OF THE GEAR REDUCER ON THE ROTARY ATOMIZER AND POOR GAS
                         DISTRIBUTION AND RETENTION IN THE SPRAY DRYER COMPARTMENT. AS OF YET, THE
                         UTILITY HAS BEEN UNABLE TO OPERATE THE SYSTEM AT A LEVEL SUFFICIENT
                         TO ACHIEVE THE DESIGN S02 REMOVAL EFFICIENCY.

10/81  SYSTEM                                                                744

11/81  SYSTEM                                                                720

12/81  SYSTEM                                                                744

       *# PROBLEMS/SOLUTIONS/COMMENTS

                         MODIFICATIONS AND TESTING CONTINUED BY WHEELABRATOR-FRYE TO REMEDY
                         INABILITY OF SYSTEM TO ACHIEVE THE DESIGN S02 REMOVAL EFFICIENCY.

 1/82  SYSTEM                                                                744

 2/82  SYSTEM                                                                672

 3/82  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODIFICATION AND TESTING OF THE FGD SYSTEM NEARED COMPLETION WITH THE
                         SUPPLIER REPORTING TO HAVE SOLVED MOST PROBLEMS.

 4/82  SYSTEM                                                                720     0

 5/82  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED THAT THE UNIT WAS DOWN ALL OF APRIL AND MOST OF MAY
                         FOR  A SCHEDULED BOILER/TURBINE WARRANTY INSPECTION.  NO FGD-RELATED
                         OUTAGES WERE ENCOUNTERED.

 6/82  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE MONTH OF JUNE, A NUMBER OF OUTAGES WERE ENCOUNTERED DUE TO THE
                         UNIT.  ONE SUCH OUTAGE WAS FOR THREE DAYS TO REPLACE SEALS IN THE AIR
                         PREHEATER.  NO FGO RELATED OUTAGES WERE ENCOUNTERED.  THE FGD SYSTEM
                         PERFORMANCE TEST IS SCHEDULED FOR THE END OF JULY.

 7/82  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A PERFORMANCE TEST WAS CONDUCTED ON THE FGD SYSTEM DURING THE MONTH OF
                         JULY.  THE UTILITY REPORTED THAT THE SYSTEM MET ALL CONTRACTUAL  SUPPLIER
                         SPECIFICATIONS.

 8/82  SYSTEM                                                                744

 9/82  SYSTEM                                                                720
                                             13-709

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 198*

MONTANA-DAKOTA UTILITIES: COYOTE 1 (CONT.)
	...	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE REMAINDER OF THE THIRD QUARTER 1962.

10/82  SYSTEM                                                                744

11/82  SYSTEM                                                                720

12/82  SYSTEM                                                                74*

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FSD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FOURTH QUARTER 1982.

  1/83  SYSTEM                                                                744

  2/83  SYSTEM                                                                672

  3/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FIRST QUARTER 1983.  THE FGD SYSTEM IS REPORTED TO HAVE AN
                         AVAILABILITY OF BETTER THAN 90X.

  4/83  SYSTEM                                                                720

  5/63  SYSTEM                                                                744

  6/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS SHUT DOWN ALL OF APRIL DUE TO A SCHEDULED BOILER/TURBINE OVER-
                         HAUL.  DURING THE OUTAGE, A LEAKY METAL EXPANSION JOINT LOCATED BETWEEN THE
                         BOILER OUTLET DUCT AND THE ABSORBER INLET WAS REPAIRED.

                         THE CONTRACT WITH WHEELABRATOR-FRYE WAS OFFICIALLY CLOSED OUT DURING THE
                         MOUTH OF MAY.

                         THE UTILITY REPORTED THAT COYOTE 1 IS RUNNING AT FULL CAPACITY AND IS ITS
                         CHEAPEST UNIT TO OPERATE.

  7/83  SYSTEM

  8/83  SYSTEM

  9/83  SYSTEM                                            .0                  720     0      0

        **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGO-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE THIRD QUARTER.  FGD  SYSTEM AVAILABILITY FOR THE PERIOD WAS


                         THE UNIT WAS DOWN ALL OF SEPTEMBER FOR SCHEDULED FALL MAINTENANCE.  THE
                         UNIT  WAS ALSO DOWN  2 ADDITIONAL DAYS EARLIER IN THE PERIOD DUE TO BOILER
                         TUBE  REPAIRS.

 10/83   SYSTEM                                                               744
                                             13-710

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

MONTANA-DAKOTA UTILITIES: COYOTE 1 ICONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


11/83  SYSTEM                                                                720

12/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED OUTAGES WERE ENCOUNTERED
                         DURING THE PERIOD.  THE FGD SYSTEM MAS AVAILABLE 100 PERCENT DURING THE
                         ENTIRE PERIOD.

 1/8*  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FIRST, SECOND AND THIRD QUARTERS OF 1984. FGD SYSTEM AVAILA-
                         BILITY MAS REPORTED AS 100X DURING THIS PERIOD.
                                             13-711

-------
UTILITY FED SURVEY: OCTOBER 1963 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC  FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
502 EMISSION  LIMITATION - NG/J
NOX EMISSION  LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

  ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE  GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

  ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE  HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE  ASH  CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE  MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE  SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE  CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

 *** PARTICLE  CONTROL

  «* ESP
     NUMBER
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE -  C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL  EFFICENCY -  7.

  **  PARTICLE  SCRUBBER
     NUMBER
     GENERIC  TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
      LINER GENERIC MATERIAL
      LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

 *»*  FGD SYSTEM

  ** GENERAL DATA
     SALEABLE PRODUCT/THROHAWAY PRODUCT
     SOZ REMOVAL  MODE
     PROCESS  TYPE
     PROCESS  ADDITIVES
     SYSTEM SUPPLIER
               e  .030 LB/MMBTU)
               ( 1.200 LB/MMBTU)
               <****** LB/MMBTU)
MUSCATINE POWER & WATER
MUSCATINE
9
MUSCATINE
IOWA
B
   13.
  516.
******
  160
  166
  150
  153
  166
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
  131.85       (
  148.9        (
   91.         (
CONCRETE
    3.5
                 279400 ACFM)
                 300 F)
                 300 FT)
               (  11.5 FT)
               (  11220 BTU/LB)
                11000-11500
COAL
BITUMINOUS
26098.

    6.70
5.0-7.0
   16.50
14.0-17.0
    3.21
2.5-3.5
      .03
0.02-0.13
COLD SIDE
RESEARCH-COTTRELL
  268.9        (  569800 ACFM)
  158.9        (   318 F)
     .1        (0. IN-H20)
   99.7
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
SALEABLE PRODUCT
WET SCRUBBING
LIMESTONE
NONE
RESEARCH-COTTRELL
                                             13-712

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
MUSCATINE POWER & MATER: MUSCATINE 9 (CONT.)

     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     SPACE REQUIREMENTS - SQ M
     OPER. fc MAINT. REQUIREMENT - MANHR/DAY

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     502 REMOVAL EFFICIENCY - X

 «* MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUf'BER OF STAGES
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH FREQUENCY

 *» REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     PERCENT GAS BYPASSED - AVG
     TEMPERATURE INCREASE - C
     INLET FLUE GAS FLOW RATE - CU. M/S
     INLET FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 *» FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
   STANLEY CONSULTANTS
   FULL SCALE
   NEW
- X   99.70
      94.00
       4.0
    1
    8/83
    4/83
    1/80
                  (   72000 SQ FT)
6688.8
  48.0
   NR
   NR
    2
    1
   COMBINATION TOWER
   SPRAY/PACKED
   N/A
   RESEARCH-COTTRELL
   34.0 DIA X 92.0
   STAINLESS STEEL
   AUSTENITIC
   TYPE 317L
   NONE
   N/A
   N/A
   VERTICAL CROSS CHANNEL FIXED GRID PACKING
    1
     254.97       (  540300 ACFM)
     162.8        (   325 F)
      94.0
   PRIMARY COLLECTOR
    1
   IMPINGEMENT
   BAFFLE
   CLOSED VANE
   HORIZONTAL
       2
        .0
   ORGANIC
   POLYPROPYLENE
   FRESH
   INTERMITTENT OVERSPRAY; CONTINUOUS UNDERSPRAY
              (   .2 IN-H20)
   IN-LINE
   STEAM
   NR
        .0
      27.8        (   50 F)
       5.43       (  11500 ACFM)
     185.6        (  366 F)
   HIGH ALLOY
   NICKEL BASE/CHROMIUM-IRON-COPPER-MOLYBDENUM
    2
    0
   NR
   AMERICAN STANDARD
   BOOSTER
   FORCED DRAFT
                                             13-713

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER

MUSCATINE POWER & MATER: MUSCATINE 9 (CONT.)

     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     KUKSER
     FULL LOAD  DRY FEED CAPACITY - M.TONS/HR

 »* PUMPS
     SERVICE
     NA
 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     OUTLET STREAM CHARACTERISTICS

**» SALEABLE BYPRODUCTS
     NATURE
     FULL LOAD QUANTITY - M T/H
     DISPOSITION
     NATURE OF END PRODUCT

*** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     SITE TREATMENT

 ** WATER BALANCE
     WATER LOOP TYPE
                                               WET
                                                  281.96        (  597500  ACFM)
                                               HIGH ALLOY
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               WET BALL  MILL
                                               COMPARTMENTED
                                               NR
                                               KENNEDY VAN  SAUN
                                                 2
                                                  13.6         (   15 TPH)
                                                NUMBER

                                                *«**
                                                 VACUUM  FILTER
                                                  2
                                                 1
                                                 SOX  SOLIDS
                                                 90X  SOLIDS
                                                 THICKENER
                                                 SOX  SOLIDS
                                                 GYPSUM
                                                     9.80
                                                 MARKETED
                                                 WALLBOARD
(  10.80 TPH)
                                                 FORCED  OXIDATION
                                                 NR
                                                 N/A
                                                 FINAL
                                                 LANDFILL
                                                 NONE
                                                CLOSED
                                            13-714

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

MUSCATINE POWER t MATER: MUSCATINE 9 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 4/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM COMMENCED OPERATIONS IN APRIL AND IS CURRENTLY IN THE START-
                         UP PHASE OF OPERATION.

 5/83  SYSTEM                                                                744

 6/83  901         97.8        80.1        95.5        47.5
       902            .0          .0                      .0
       SYSTEM      97.8        80.1        95.5        47.5                  720   427    342  38.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY HAS OPERATED ONLY ONE OF THE TWO 100 X CAPACITY
                         ABSORBER TOWERS.  THE TOWER OPERATED FOR APPROXIMATELY 14 DAYS IN JUNE.
                         SEVERAL OUTAGES OCCURRED DUE TO ELECTRICAL PROBLEMS.  PERFORMANCE TESTING
                         IS SCHEDULED TO TAKE PLACE SOMETIME IN AUGUST.
                                                                             744   472    231



                                                                             744   472    231



                                                                             720   457    224

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE THIRD QUARTER OF 1983.

10/83  T-901       57.0        69.4        76.5        48.0
       T-902       58.3         6.3         7.5         4.4
       SYSTEM     100.0        75.7        84.0        52.4                  744   515    390

11/83  T-901       57.0        69.4        76.5        48.0
       T-902       58.3         6.3         7.5         4.4
       SYSTEM     100.0        75.7        84.0        52.4                   48   498    377

12/83  T-901       57.0        69.4        76.5        48.0
       T-902       58.3         6.3         7.5         4.4
       SYSTEM     100.0        75.7        84.0        52.4                  744   515    390

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED WETTED FILM CONTACTOR PLUGGING IN MODULE T-901 DURING
                         THE FOURTH QUARTER 1983.

 1/84  T-901       10.9         8.7        79.9         8.0
       T-902       61.2        40.0       100.0        36.6
       SYSTEM      72.1        48.8       100.0        44.6                  744   681    332

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE T-902 WAS OUT OF SERVICE 288.5 HOURS DURING THE MONTH FOR A
                         SCHEDULED MAINTENANCE OUTAGE.
                                            13-715
7/83


8/83


9/83


T-901
T-902
SYSTEM
T-901
T-902
SYSTEM
T-901
T-902
SYSTEM
37.4
.0
37.4
37.4
.0
100.0
37.4
.0
37.4
48.9
.0
48.9
48.9
.0
48.9
48.9
.0
48.9
100.0

100.0
100.0

100.0
100.0

100.0
31.0
.0
31.0
31.0
.0
31.0
31.0
.0
31.0

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

MUSCATINE POWER & WATER: MUSCATINE 9 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGO   CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR

                         THE UTILITY REPORTED THAT 663 HOURS OF FORCED OUTAGE TIME DURING JANUARY
                         WAS DUE TO THE CHANGING OF ABSORBER PACKING AT MODULE T-901.
  3/8*
T-901
T-902
SYSTEM

T-901
T-902
SYSTEM

T-901
T-902
SYSTEM
 76.6
 27.6
100.0

   .0
   .0
   .0

   .0
 24.9
 2*.9
                                           90.6
                                           12.5
                                          100.0
                                          100.0
                                          100.0
69.4
 3.4
72.8

  .0
  .0
23.2
23.2
696
                                                                              744
720
             507
             167
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         TURBINE  PROBLEMS WERE ENCOUNTERED DURING THE MONTH AND FGD SYSTEM  MAINTEN-
                         ANCE WAS CONDUCTED DURING THIS TIME.
  5/84  T-901
        T-902
        SYSTEM

  6/84  T-901
        T-902
        SYSTEM

  7/84  T-901
        T-902
        SYSTEM

  8/84  T-901
        T-902
        SYSTEM
           100.0
            37.0
           100.0

           100.0
             6.7
           100.0

            67.7
              .0
            67.7

            54.3
            36.0
            90.3
                        100.0
                        100.0
                        100.0

                         92.8

                         92.8

                        100.0

                        100.0

                        100.0
                        100.0
                        100.0
62.1
28.2
90.3

92.8
  .0
92.8

54.3
  .0
54.3

54.3
18.5
72.8
744
720
744
                                                                             744
             672
668
             404
                                                                                          542
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE  UTILITY  REPORTED THAT NO MAJOR FGD RELATED PROBLEMS WERE ENCOUNTERED
                          DURING THE PERIOD  OF FEBRUARY THROUGH AUGUST, 1984.
  9/84  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          INFORMATION WAS UNAVAILABLE  FOR SEPTEMBER 1984.
                                                                      720
                                             13-716

-------
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC F6D SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MM
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RAN3E CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
     TYPE
     SUPPLIER
     PARTICLE REMOVAL EFFICENCY ~7.

 ** PARTICLE SCRUBBER
     NUtfSER
     INITIAL START-UP DATE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - LITER/CU.M
     PRESSURE DROP - KPA
     SUPERFICIAL GAS VELOCITY - M/S
     INLET GAS FLOW RATE - CU.M/S
     INLET GAS TEMPERATURE - C
     PARTICLE REMOVAL EFFICIENCY - 7.
               (   .100 LB/MMBTU1
               (  1.200 LB/MMBTU)
               («*«*«* LB/MMBTU)
NEVADA POWER
REID GARDNER
1
MOAPA
NEVADA
D
   43.
  516.
******
  111
  125
  110
  495
  125
FOSTER WHEELER
PULVERIZED COAL
BASE
  223.21
  176.7
   61.
CONCRETE
    3.8        (  12.6 FT)
               ( 473000 ACFM)
               ( 350 F)
               ( 200 FT)
COAL
BITUMINOUS
28959.

    8.00
8.0-10.0
    5.50
5.5-6.0
     .50
0.5-1.0
               (  12450 BTU/LB)
                11500-12500
     .05
******
MULTICLONE
RESEARCH-COTTRELL
   75.0
 1
 4/74
VENTURI TOWER
FIXED THROAT
N/A
THYSSEN/CEA
1.5 DIA X 18.0
CARBON STEEL; HIGH ALLOY
AISI 1110; NICKEL BASE/CHROMIUM-IRON-COPPER-MOLY
NONE; ORGANIC
N/A; NATURAL RUBBER
NOME
  157.5
    1.3
    4.6
   50.3
  223.2
  176.7
   97.0
               ( 2500 GPM)
               (10.0 GAL/1000ACF)
               (18.5 IN-H20)
               (  165.0 FT/S)
               ( 473000 ACFM)
               (  350 F)
                                            13-717

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 1 (CONT.)
**» FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROMAWAY PRODUCT
     502 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL  EFFICIENCY - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

  ** DESIGN  AND OPERATING PARAMETERS

  *» QUENCHER/PRESATURATOR
     CONSTRUCTION  MATERIAL  GENERIC TYPE
     CONSTRUCTION  MATERIAL  SPECIFIC  TYPE

  ** ABSORBER
     NUMBER
     GENERIC  TYPE
     SPECIFIC  TYPE
     TRADE  NAME/COMMON TYPE
      SUPPLIER
     DIMENSIONS  -  FT
     SHELL  GENERIC MATERIAL
     SHELL  SPECIFIC MATERIAL
      SHELL  MATERIAL TRADE  NAME/COMMON TYPE
      LINER  GENERIC MATERIAL
      LINER  SPECIFIC MATERIAL
      LINER  MATERIAL TRADE  NAME/COMMON TYPE
      GAS CONTACTING DEVICE  TYPE
      NUMBER OF CONTACTING  ZONES
      LIQUID RECIRCULATION  RATE -  LITER/S
      L/G RATIO - L/CU.M
      GAS-SIDE PRESSURE DROP - KPA
      SUPERFICAL GAS VELOCITY  - M/SEC

  »* MIST ELIMINATOR
      PRE-MIST ELIMINATOR/MIST ELIMINATOR
      NUMBER PER SYSTEM
      GENERIC TYPE
      SPECIFIC TYPE
      TRADE NAME/COMMON TYPE
      CONFIGURATION
      NUMBER OF STAGES
      NUMBER OF PASSES PER  STAGE
      PRESSURE DROP - KPA
      CONSTRUCTION MATERIAL GENERIC TYPE
      CONSTRUCTION MATERIAL SPECIFIC TYPE

  ** REHEATER
      GENERIC TYPE
      SPECIFIC TYPE
      TRADE NAME/COMMON TYPE
      TEMPERATURE INCREASE  - C
      INLET FLUE GAS TEMPERATURE - C
      NUMBER OF TUBES PER BUNDLE
      CONSTRUCTION MATERIAL GENERIC TYPE
      CONSTRUCTION MATERIAL SPECIFIC TYPE

  «* FANS
      NUMBER
      DESIGN
 THROWAWAY PRODUCT
 WET SCRUBBING
 SODIUM CARBONATE
 NONE
 THYSSEN/CEA
 BECHTEL
 FULL SCALE
 RETROFIT
X   97.00
    90.00
  1
  4/74
  7/71
 NR
 NR
 TRAY TOWER
 SIEVE TRAY
 N/A
 THYSSEN/CEA
 30.0 DIA
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 NATURAL RUBBER
 BLACK NATURAL RUBBER
 PERFORATED TRAYS
  1
    38.         (
      .Z        (
      .7        (
     3.4        (
 600 GPM)
 1.6 GAL/1000 ACF)
3.0 IN-H20)
11.0 FT/S)
 PRIMARY COLLECTOR
  1
 CENTRIFUGAL
 RADIAL VANE
 NR
 HORIZONTAL
     1
     1
       •1         (   .5 IN-H20)
 STAINLESS STEEL
 AUSTENITIC
 INDIRECT HOT AIR
 EXTERNAL HEAT EXCHANGER
 STEAM TUBE BUNDLE
     27.8         (   50 F)
     48-3         (  119 F)
    24
 CARBON STEEL
 AISI 1110
  CENTRIFUGAL
                                             13-718

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
NEVADA POWER: REID GARDNER 1 (CONT.)

     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 *« DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 *» TANKS
     SERVICE
      SCRUBBER  RECYCLE

  *»  PUMPS
      SERVICE
      SCRUBBER  RECIRCULATION
      ABSORBER  RECIRCULATION

  *«  SOLIDS CONCENTRATING/DEWATERING
      DEVICE

 ***  SLUDGE

  *»  TREATMENT
      METHOD
      DEVICE
      PROPRIETARY PROCESS

  **  DISPOSAL
      NATURE
      TYPE
      LOCATION
      SITE  TREATMENT

  **  DISPOSAL
      NATURE
      TYPE
      LOCATION
      SITE  TRANSPORTATION METHOD
      SITE  TREATMENT
               (  473000 ACFM)
               (   350 F)
BUFFALO FORGE
UNIT
FORCED DRAFT
DRY
  223.21
  176.7
CARBON STEEL
NR
NR
NR
NR
NR
NR
NR
SCRUBBER INLET
CARBON STEEL
AISI 1110
NONE
N/A
SCRUBBER OUTLET
CARBON STEEL
AISI 1110
ORGANIC
INERT FLAKE-FILLED VINYL ESTER
MIX TANK
N/A
AGITATED TANK
NUMBER

   1


NUMBER
NONE
BLEED
N/A
N/A
INTERIM
POND
ON-SITE
CLAY LINING
FINAL
POMO
ON-SITE
GRAVITY FLOW FROM INTERIM SLUDGE POND
CLAY LINING
                                             13-719

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

NEVADA POWER: REID GARDNER 1 (CONT.)
 ** WATER BALANCE
     WATER LOOP TYPE
     MAKEUP HATER ADDITION - LITERS/S

 ** FGO SPARE CAPACITY INDICES
     ABSORBER - X

 ** FGD SPARE COMPONENT INDICES
     ABSORBER
                                              CLOSED
                                                  9.8
                                                   .0
                                                   .0
(   155 GPM)
 	,	PERFORMANCE  DATA	•	
 PERIOD  MODULE  AVAILABILITY  OPERABILITY  RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR
  4/74  SYSTEM
                                                                              7ZO
        ** PROBLEMS/SOLUTIONS/COMMENTS
  5/74  SYSTEM
  6/74  SYSTEM
  7/74  SYSTEM
  8/74  SYSTEM
  9/74  SYSTEM
 10/74  SYSTEM
 11/74  SYSTEM
                       THE SYSTEM WAS FIRST PLACED IN SERVICE IN APRIL 1974.  THE SCRUBBING UNIT
                       DESIGN WAS BASED ON INFORMATION AND DATA OBTAINED FROM AN 8000-ACFM PILOT
                       PUNT PROGRAM CONDUCTED AT REID GARDNER STATION IN 1971 AND 1972.

                                                                           744

                                                                           720

                                                                           744

                                                                           744

                                                                           720

                                                                           744
 12/74  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
                                                                              720
                                                                           744
                          THE FGD SYSTEM HAS PERFORMED ACCEPTABLY SINCE START UP IN APRIL 1974.
                          SYSTEM AVAILABILITY HAS BEEN GREATER THAN 90X AND OPERATIONS HAVE ONLY BEEN
                          INTERRUPTED BY LACK OF TROUA.  S02 REMOVAL EFFICIENCY HAS BEEN
                          APPROXIMATELY 85X.  BECAUSE OF A COAL STRIKE THE BOILER ONLY OPERATED ABOUT
                          TWO WEEKS IN NOVEMBER AND DURING THOSE TWO WEEKS IT OPERATED AT LOW LOAD
                          DELIVERY OF TRONA WAS SUFFICIENT TO MAINTAIN FGO SYSTEM OPERATION.  THERE
                          ARE NO OUTSTANDING MECHANICAL OR PROCESS PROBLEMS.
   1/75  SYSTEM                  65.0

        ** PROBLEMS/SOLUTIONS/COMMENTS
                                                                           744
                          FROZEN SODIUM CARBONATE FEED LINES ACCOUNTED FOR MOST OF THE JANUARY OUTAGE
                          TIME.  THE FGD SYSTEM HAS BEEN OPERATING WITH TRONA SUPPLEMENTED BY SODIUM
                          CARBONATE BRINE.
                                                                              672
2/75  SYSTEM                  95.0

      *» FROBLEMS/SOLUTIONS/COMMENTS

                        A 2-DAY LACK OF  CHEMICALS RESULTED IN OUTAGE TIME DURING FEBRUARY.

3/75             100.0       100.0
        SYSTEM

  4/75  SYSTEM
                 100.0
                             100.0
              744

              720
                                             13-720

-------
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 198*

NEVADA POWER: REID GARDNER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                302  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS SHUT DOWN APRIL 13 FOR ROUTINE MAINTENANCE.  THE UNIT IS
                         SCHEDULED TO BE BACK IN SERVICE IN EARLY MAY.

 5/75  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER AND FGO SYSTEM WERE PLACED BACK IN SERVICE ON MAY 12.

                         THE UTILITY REPORTED THAT A HIGH ASH CONTENT OF UP TO 20Z BY WEIGHT OF THE
                         COAL BURNED RECENTLY HAD NO EFFECT ON EMISSIONS.

                         THE UTILITY REPORTED PROBLEMS WITH ABRASION OF THE PIPING RUBBER LINING AND
                         ROUTINE  MECHANICAL PROBLEMS.

                         INSTRUMENTATION PROBLEMS WERE ENCOUNTERED OVER THE APRIL-MAY PERIOD.

 6/75  SYSTEM                                                                720

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         ROUTINE  MECHANICAL PROBLEMS CONTINUED THROUGH JUNE.

                         MINOR  INSTRUMENTATION  PROBLEMS CONTINUED THROUGH JUNE.

                         THE UTILITY HAS REPORTED THAT A SECOND PERFORMANCE TEST WAS RECENTLY
                         COMPLETED AND PASSED.

 7/75  SYSTEM                   85.0                                          744

 8/75  SYSTEM                                                                744

 9/75  SYSTEM                   78.1                    77.6                  720   716    559

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         FOUR  FORCED OUTAGES OCCURED DURING SEPTEMBER.  THREE OF THE FOUR WERE
                         SCRUBBER-RELATED.  DETAILS WERE NOT AVAILABLE FROM THE UTILITY.

 10/75  SYSTEM                   35.0                    14.0                  744   303    106

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         LOW OPERATING TIME DURING OCTOBER WAS DUE TO SCHEDULED BOILER  MAINTENANCE.

                         ONE OUTAGE WAS DUE TO  THE MALFUNCTION OF A SODA ASH BLOWER.

 11/75  SYSTEM                   60.3                    54.7                  720   654    394

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         OPERABILITY WAS  LOW FOR THE MONTH OF NOVEMBER BECAUSE OF  DELAYS IN THE
                         DELIVERY OF REPAIR MATERIALS.

 12/75  SYSTEM                                                                744

 1/76  SYSTEM       26.7        30.6        30.6       26.7                  744   647     198
                                             13-721

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP'
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE COLLAPSE OF A VENTURI STRAINER RESULTED IN FGO SYSTEM OUTAGE DURING
                         J A WARY.

                         REHEATER STEAM LEAKS CAUSED AN OUTAGE DURING JANUARY.  REPAIRS COULD NOT BE
                         MADE WITH THE BOILER IN SERVICE.

                         A FROZEN CARBONATE LINE RESULTED IN AN FGD SYSTEM OUTAGE DURING JANUARY.

                         THE SYSTEM WAS SHUT DOWN FOR 16 DAYS IN JANUARY FOR COMPLETION OF PIPING
                         CONVERSION.  THIS OUTAGE WAS NOT DUE TO A SCRUBBER MALFUNCTION.

 2/76  SYSTEM      89.3        74.6        80.7        71.2                  696   664    496

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         A DEPLETION OF CHEMICALS DURING FEBRUARY ACCOUNTED FOR NEARLY 44 HOURS OF
                         SCRUBBER OUTAGE TIME.

                         FIVE SCRUBBER INOPERATIVE PERIODS WERE REPORTED DURING FEBRUARY.  THREE OF
                         THESE OUTAGES WERE NOT RELATED TO THE FGD SYSTEM.

                         SEAL WATER PROBLEMS WERE REPORTED DURING FEBRUARY.

                         CHEMICAL LINE PLUGGING PROBLEMS WERE NOTED DURING FEBRUARY.

 3/76  SYSTEM      99.2        71.9        99.2        38.5                  744   398    287

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         ONE FORCED SCRUBBER OUTAGE WAS CAUSED BY A VENTURI LEAK.

 4/76  SYSTEM      100.0        91.1       100.0        13.4                  720   106     97

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS TAKEN OUT OF SERVICE IN APRIL FOR INSPECTION OF VALVES AND
                         COAL CONDUITS.

 5/76  SYSTEM      100.0                                   .0                  744     0       0

 6/76  SYSTEM      100.0                                   .0                  720     0       0

  7/76  SYSTEM      100.0                                   .0                  744     0       0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS  SHUT DOWN FOR A SCHEDULED TURBINE OVERHAUL AND BURNER  LINE
                         CONDUIT REPLACMENT  THROUGH MAY,  JUNE, AND JULY.

  8/76  SYSTEM      96.6        65.7       93.3        46.9                  744   531    349

        ** PROBLEMS/SOLUTIONS/COMMENTS

                         TURBINE VIBRATION CHECKS CONTINUED THROUGH AUGUST 8.  THE SCRUBBER  WAS NOT
                         OPERATED UNTIL  AUGUST 12.

                          PLUGGING  IN THE  THICKNER CAUSED  AN OUTAGE DURING AUGUST.

                          PLUGGING  IN THE  TRAY RECYCLE TANK DURING AUGUST RESULTED IN AN FGD  OUTAGE.

  9/76  SYSTEM      96.6         96.4       96.4        91.1                  720   681    656
                                             13-722

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POHER: REID GARDNER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       «* PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER-RELATED PROBLEMS ACCOUNTED FOR APPROXIMATELY 40 HOURS OF THE FGD
                         SYSTEM DOWNTIME IN SEPTEMBER.

                         PLUGGING IN THE VENTURI SPRAY HEADERS CAUSED A SCRUBBER OUTAGE.

                         AN ID FAN MALFUNCTION RESULTED IN SCRUBBER OUTAGE DURING SEPTEMBER.

10/76  SYSTEM      97.9        96.5        97.7        87.9                  744   678    654

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER MAS OUT OF SERVICE FOR 75 HOURS IN OCTOBER TO REPLACE A BURNER.

                         SCRUBBER OUTAGE TIME WAS REQUIRED FOR INSTALLATION OF A NEW CARBONATE FEED
                         LINE.

                         A MINOR SCRUBBER TRIP WAS CAUSED BY PLUGGING IN THE SCRUBBER EFFLUENT
                         SUCTION LINE.

11/76  SYSTEM      86.5        84.2        84.8        75.3                  720   644    542

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         ONE 97 HOUR SCRUBBER OUTAGE OCCURED BECAUSE OF A SCREW CONVEYOR FAILURE,
                         RESULTING IN AN INABILITY TO MIX THE CHEMICAL ABSORBENT.

12/76  SYSTEM      92.8        90.6        91.9        82.1                  744   675    611

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER RELATED PROBLEMS ACCOUNTED FOR 79 HOURS OF THE DECEMBER OUTAGE TIME.

                         A FORCED FGD OUTAGE RESULTED FROM CHEMICAL DEPLETION.

                         A PLUGGED SENSING LINE FORCED AN FGD OUTAGE DURING DECEMBER.

 1/77  SYSTEM      68.4        62.8        63.9        56.0                  744   663    416

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         RUBBER LINING REPAIRS WERE INITIATED IN THE SEPARATOR SECTION OF THE
                         SCRUBBING MODULE ON JANUARY 22.  THE LINING WAS DAMAGED BY A HIGH
                         TEMPERATURE EXCURSION RESULTING FROM A MALFUNCTION IN THE BOILER AIR
                         PREHEATER.

 2/77  SYSTEM         .0          .0          .0          .0                  672   599      0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         RUBBER LINING WORK CONTINUED ON THE SCRUBBER DURING FEBRUARY.  THE BOILER
                         WAS DOWN PART OF THE PERIOD BECAUSE OF A STRIKE.

 3/77  SYSTEM         .0          .0          .0          .0                  744   669      0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         SCRUBBER RUBBER LINING REPAIRS CONTINUED.

 4/77  SYSTEM         .0          .0          .0          .0                  720   400      0
                                             13-7Z3

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   X REMOVAL    PER  BOILER   FGD    CAP.
                                                                 SOZ   PART.  HOURS HOURS   HOURS FACTOR


       «* PROBLEMS/SOLUTIONS/COMMENTS

                         SCRUBBER RUBBER  LINING REPAIRS CONTINUED.

 5/77  SYSTEM         .0           .0           .0           .0                   744    705       0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         SCRUBBER RUBBER  LINING REPAIRS CONTINUED.

 6/77  SYSTEM       47.1        48.4        48.4        47.1                   720    701     339

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         REPAIRS ON  THE DAMAGED RUBBER LINING WERE COMPLETED BY MID-JUNE AND  THE
                         SYSTEM  REMAINED  IN  SERVICE  THROUGHOUT  THE MAJORITY OF THE MONTH.

                         A MINOR FORCED OUTAGE RESULTED FROM A  HIGH-LOW PRESSURE TRIP CAUSED  BY A
                         PLUGGED SENSING  LINE.

  7/77  SYSTEM       99.5         99.5         99.5        99.5                   744    744     740

        ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SYSTEM  WAS TAKEN OUT OF THE  GAS PATH ONLY  ONCE DURING THE  MONTH
                         BECAUSE OF  A  SCHEDULED  INSPECTION OF THE NEWLY REPLACED RUBBER  LINER IN
                         THE SCRUBBER  SEPARATOR  SECTION.

  8/77  SYSTEM      13.8         15.5         15.5        13.8                   744    662     102

        «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCRUBBER  WAS OUT OF  SERVICE  MOST OF AUGUST FOR ID FAN VIBRATION
                          PROBLEMS.

                          INSTALLATION  OF  ID FAN  RELAYS ACCOUNTED FOR  SOME  DOWNTIME DURING AUGUST.

  9/77  SYSTEM      84.4         73.4         69.3        35.0                   720    344     252

        «» PROBLEMS/SOLUTIONS/COMMENTS

                          THE BOILER  WAS  OUT OF SERVICE FOR MOST OF SEPTEMBER FOR NON-SCRUBBER
                          RELATED PROBLEMS.

                          THE SCRUBBER  HAD LIMIT  SWITCH PROBLEMS WITH  14 A  » B GULLOTINE  DAMPERS.

 10/77  SYSTEM      99.3        94.4         99.2        84.7                   744    668     630

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE UNIT WAS  DOWN FOR  FIVE  HOURS DURING OCTOBER TO REPAIR AN ID FAN LEAK.

 11/77  SYSTEM      78.7        81.5         81.5        78.1                   720    690     562

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          SCREEN PLUGGING IN THE  RECYCLE TANK WAS A PROBLEM DURING  NOVEMBER.

                          SCRUBBER INSTRUMENTATION DIFFICULTY WAS EXPERIENCED DURING NOVEMBER.

                          THE SYSTEM WAS DOWN FOR THE INSTALLATION  OF  AN OUTLET NOZZLE IN THE BOOSTER
                          TANK.                                                                     K

 12/77  SYSTEM      85.4        80.6         82.8         70.2                   744    648     522
                                             13-724

-------
                                                  UTILITY F60 SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  F6D   CAP.
                                                                SOS  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCRUBBER MAS OFF-LINE FOR APPROXIMATELY 109 HOURS DUE TO HIGH TRAY
                         DIFFERENTIAL PRESSURE AND SOME PLUGGING IN THE 10 FAN SENSING LINE.

                         THE BOILER WAS DOWN ABOUT 113 HOURS IN DECEMBER FOR NON-SCRUBBER RELATED
                         PROBLEMS.

 1/78  SYSTEM      67.7        67.5        67.5        55.9                  744   616    416

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         TWO OUTAGES HERE CAUSED BY PROBLEMS RELATED TO HIGH TRAY DIFFERENTIAL
                         PRESSURES.

                         ELECTRICAL PROBLEMS IN THE 1A FORCED DRAFT FAN CAUSED AN FGD SYSTEM OUTAGE.

                         AIR PRESSURE FAILURE TO AN ID FAN DAMPER ACCOUNTED FOR SOME JANUARY
                         DOWNTIME.

 3/78  SYSTEM      97.4        74.9        94.3        43.4                  672   389    292

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A DUCT  HI-LO PRESSURE TRIP CONTRIBUTED TO THE FEBRUARY OUTAGE TIME.

                         THE BOILER WENT OUT OF SERVICE ON FEBRUARY 17 FOR A THREE WEEK OUTAGE.

                         PLUGGED SENSING LINES CONTRIBUTED TO THE OUTAGE TIME DURING FEBRUARY.

 3/78  SYSTEM      76.2        58.3        58.3        27.8                  744   355    207

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS OFF LINE UNTIL MARCH 16.

                         A PROBLEM HAS ENCOUNTERED WITH THE REHEAT STEAM REGULATOR DURING MARCH.

                         PROBLEMS WITH THE GUILLOTINE SWITCHES DELAYED START-UP OF THE FGD SYSTEM
                         UNTIL MARCH 22.

 4/78  SYSTEM      100.0        96.7       100.0        75.2                  720   560    541

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THERE WERE NO FGD SYSTEM FORCED  OUTAGES.  ALL DOWNTIME WAS BOILER RELATED
                          (179  HOURS).

 5/78  SYSTEM      97.0        92.4        96.3        78.2                  744   630    582

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE REPAIRS TO THE CONDENSER AND PRODUCTION CONTROL CONTRIBUTED TO  THE
                         BOILER  OUTAGES.

                         HIGH  TEMPERATURE ON AN ID FAN BEARING CAUSED AN OUTAGE.

 6/78  SYSTEM      91.8        91.8        91.8        91.8                  720   720    661
                                             13-725

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X  REMOVAL    PER   BOILER   FGD    CAP.
                                                                S02   PART.  HOURS  HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A 31 HOUR OUTAGE WAS REQUIRED TO CHANGE THE  OIL ON THE ID FAN.

                         A HIGH DUCT PRESSURE TRIP OCCURED  DURING  JUNE  ACCOUNTING FOR SOME DOWNTIME.

                         OUTAGE TIME WAS REQUIRED TO CLEAN  AN ABSORBER  TRAY.

  7/78 SYSTEM       99.0        99.0         99.0        99.0                  7*4    7**    736

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         FGD OUTAGE TIME WAS REQUIRED TO RECTIFY A HIGH TRAY DIFFERENTIAL PRESSURE
                         PROBLEM.  THE TRAY WAS  CLEANED OUT DURING THE  OUTAGE.

  8/78  SYSTEM       9*.5        93.6         94.2        88.8                  744    706    661

        »*  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  SCRUBBER WAS  FORCED OFF  LINE ON AUGUST 5 BECAUSE OF  A LOSS  OF THE
                         ASH  PANEL CONTROL  POWER.  THIS  LEFT THE UNIT WITHOUT EMERGENCY  SPRAY TO
                         THE  SCRUBBERS.

                         A FORCED  OUTAGE OCCURED ON AUGUST  20 WHEN THERE WAS A SCRUBBER  VENTURI
                         HIGH  TEMPERATURE  ALARM. THE EXACT CAUSE  WAS NOT  KNOWN BUT A BOILER  TUBE
                          LEAK WAS  SUSPECTED.

                          THERE WAS ONE  SCHEDULED OUTAGE  DURING  THE MONTH TO CLEAN AN ABSORBER TRAY.

  9/78  SYSTEM      99.3        97.2         99.2        86.9                  720    644    626

        «* PROBLEMS/SOLUTIONS/COMMENTS

                          THERE WERE  THREE  BOILER RELATED  OUTAGES DURING SEPTEMBER.  A BOILER  TUBE
                          LEAK AND  BOILER  BURNER  WERE  REPAIRED.

                          DURING THE  MONTH  A BOILER  TRIP  OCCURRED WHICH  WAS CAUSED BY SCRUBBER
                          HIGH DUCT PRESSURE.   SCRUBBER  PRESSURE SENSING LINES WERE CLEANED.

  10/78  SYSTEM      100.0        99.8       100.0         69.6                  744    668    667

        ** FROBLEMS/SOLUTIONS/COMMENTS

                          THE BOILER WAS OFF LINE FOR  ABOUT 77  HOURS  FOR REMOVAL  OF AN ASH CLINKER.

  11/78  SYSTEM      90.4        88.9        89.9        84.7                  720    686    610

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE FGD SYSTEM WAS DOWN FOR  9 HOURS TO REPAIR  SCRUBBER  OUTLET TEMPERATURE
                          PROBES.

                          OUTAGE TIME RESULTED FROM BOILER BOTTOM HOPPER PROBLEMS   A HIGH
                          TEMPERATURE TRIP AT THE VENTURI GAS OUTLET  OCCURRED BECAUSE OF  THE BOILER
                          PROBLEMS.

                          SOME OUTAGE TIME RESULTED FROM A HIGH SCRUBBER EFFLUENT SOLIDS LEVEL.

  12/78  SYSTEM      95.6        92.8        95.4        92.0                  744   733    6S5
                                             13-726

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCRUBBING SYSTEM MAS OUT OF SERVICE TO REPAIR A LEAK IN A VENTURI LINE.

                         THE FGD SYSTEM WAS DOWN TO CLEAN THE VENTURI SPRAY COLLAR (RACE TRACK)
                         AND CLEAN PRESSURE SENSING LINES.

                         THE BOILER WAS OFF LINE APPROXIMATELY ONE DAY FOR PULVERIZER REPAIRS.

 1/79  SYSTEM      83.9        73.7        80.8        67.5                  744   682    502  73.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS DOWN ABOUT FIVE DAYS TO REMOVE A CLINKER FROM THE BOTTOM
                         HOPPER.

                         A 58 HOUR SCRUBBER OUTAGE WAS CAUSED WHEN A SCRUBBER POWER CIRCUIT TRIPPED
                         RESULTING IN LOSS OF POWER TO TRAY SPRAY PUMP.  REPAIRS WERE MADE ON THE
                         TRAY AND SPRAY SYSTEMS.

                         THE FGD SYSTEM WAS DOWN FOR A SHORT PERIOD TO INSPECT THE ID FAN BEARINGS.

                         THE FGD SYSTEM WAS DOWN FOR 48 HOURS TO REPAIR A LEAK IN THE VENTURI LINE.

 2/79  SYSTEM      85.6        85.9        85.9        85.6                  672   670    575  79.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS DOWN TO CLEAN THE VENTURI SPRAY COLLAR (RACE TRACK)
                         NOZZLES, CLEAN THE EFFLUENT LINE AND REPAIR A LEAK IN THE VENTURI LINE.

                         A BREAK IN THE BOTTOM ASH CIRCULATING WATER LINE RESULTING IN LOSS OF EMER-
                         GENCY COOLING WATER FORCED THE FGD SYSTEM OFF LINE.

 3/79  SYSTEM      97.9        96.5        97.4        78.3                  744   604    583  64.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS OFF TO UNPLUG VENTURI NOZZLES AND TO CLEAN SENSING
                         LINES.  THE DOWNTIME WAS ABOUT 15 HOURS.

                         THE FGD SYSTEM WAS OFF FOR ABOUT 146 HOURS FOR REPAIR OF BOILER TUBE  LEAKS.

 4/79  SYSTEM      100.0        98.6       100.0        25.7                  720   188    185  86.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER AND FGD SYSTEM WERE OFF FOR APPROXIMATELY 535 HOURS FOR
                         SCHEDULED MAINTENANCE.

 5/79  SYSTEM      99.8        74.4        99.4        27.5                  744   275    204  84.8

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER AND SCRUBBER WERE RETURNED TO SERVICE MAY 22 AFTER COMPLETING
                         SCHEDULED MAINTENANCE.

                         THE BOILER WAS FORCED OUT OF SERVICE TO REPAIR A COAL  LEAK ON THE  «8
                         BURNER  LINE.

                         THE SCRUBBER WAS OFF LINE APPROXIMATELY ONE HOUR TO CLEAN A  RECYCLE TANK
                         RETURN  LINE.

 6/79  SYSTEM      97.9        95.2        97.6        84.7                  720   641    610  86.9
                                             13-727

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 1 (CONT.)
	.	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER   BOILER   FGD   CAP.
                                                                 502   PART.  HOURS HOURS  HOURS FACTOR


       **  PROBLEMS/SOLUTIONS/COMMENTS

                         A 94 HOUR OUTAGE WAS REQUIRED TO REPAIR A BOILER TUBE LEAK.

                         OUTAGE  TIME WAS REQUIRED TO UNPLUG  A  VENTURI LINE.

                         TRAY SPRAY VALVES  WERE  REPLACED DURING JUNE.

  7/79 SYSTEM       82.1        80.5         81.0        80.3                   744   742    597  85.7

       *»  PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER AND FGD SYSTEM WAS FORCED  OFF LINE DURING A  TURBINE  OVERSPEED
                         GOVERNOR  TEST.  THE DOWNTIME  WAS ABOUT SEVEN HOURS.

                         THE SCRUBBER WAS OFF ABOUT 67 HOURS TO CLEAN THE SCRUBBER TRAYS.

                         THE  LOSS  OF  INSTRUMENT  AIR TO THE SCRUBBER  CONTROLS RESULTED FROM A
                         SCRUBBER  AIR COMPRESSOR POWER FAILURE.  THE SCRUBBER WAS OFF-LINE FOR ABOUT
                         74 HOURS.

  8/79  SYSTEM      96.9        96.9         96.9        96.9                   744   744    721  87.5

        ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  SCRUBBER WAS REMOVED  FROM SERVICE TO CLEAN THE SCRUBBER  PRESSURE
                         SENSING LINES.  THE SCRUBBER  WAS DOWN FOR ABOUT 11 HOURS.

                         THE  SCRUBBER WAS DOWN AT  THE  END OF THE MONTH AGAIN TO  CLEAN THE PRESSURE
                         SENSING LINE ON THE SCRUBBER.  THE  SCRUBBER WAS OFF LINE FOR ABOUT THREE
                         HOURS.

  9/79  SYSTEM     100.0       100.0        100.0        53.2                   720   383    383  88.5

        «* PROBLEMS/SOLUTIONS/COMMENTS

                          THE  BOILER,  TURBINE, AND  SCRUBBER WERE SHUT DOWN FOR SCHEDULED
                          MAINTENANCE  ON SEPTEMBER  16.

 10/79  SYSTEM      79.6        68.2         71.0        49.9                   744   545    372  85.8

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE SCRUBBER WAS  OFF  LINE WITH  THE  BOILER AND TURBINE FOR SCHEDULED
                          MAINTENANCE THROUGH OCTOBER  8.

                          PLUGGING OF THE VENTURI AND  EFFLUENT  LINE CAUSED THREE  OUTAGES  DURING THE
                          MONTH.

                          THE SCRUBBER WAS SHUT  DOWN SO THAT  REPAIRS  COULD BE MADE TO  THE ID FAN
                          DAMPER.

                          THE SCRUBBER WAS SHUT  DOWN BECAUSE  OF A BOILER TURBINE  PROBLEM.

 11/79  SYSTEM      99.4         96.8        99.4       88.2                   720   656    635  87.0

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE SCRUBBER WENT OFF-LINE WITH THE BOILER  TO REPAIR TURBINE POWER
                          SWITCHES.

                          TWO OUTAGES DURING NOVEMBER WERE CAUSED BY  A BOILER TUBE LEAK.
                                             13-720

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         THE SCRUBBER MAS SHUT DOWN SO THAT THE VENTURI SPRAY COLLECTOR (RACE TRACK)
                         NOZZLES COULD BE CLEANED.

                         TWICE DURING THE MONTH THE TURBINE TRIPPED CAUSING THE SECTION IB BREAKER
                         TO BE LOST.  ON THE SECOND TRIP A COOLING TOWER FAN MOTOR SHORTED TO
                         GROUND.

12/79  SYSTEM      98.5        98.5        98.5        98.5                  744   744    733  88.2

       *»  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING DECEMBER THE SCRUBBER WAS TAKEN OFF LINE TO REPAIR A MALFUNCTIONING
                         VALVE ON THE EMERGENCY SPRAY SYSTEM.

 1/80  SYSTEM     100.0       100.0       100.0       100.0                  744   744    744 100.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER AND FGD SYSTEM OPERATED THE ENTIRE MONTH OF JANUARY WITH NO
                         OUTAGES.

 2/80  SYSTEM     100.0       100.0       100.0       100.0                  696   696    696 100.0

       «*  PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER AND FGD SYSTEM OPERATED THE ENTIRE MONTH OF FEBRUARY
                         WITH NO OUTAGES.

 3/80  SYSTEM      93.8        83.3        84.4        33.6                  744   300    250  97.0

       «*  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FIRST OF MARCH THE FGD SYSTEM WAS OFF LINE FOR A SCHEDULED
                         OVERHAUL.

                         THE FGD UNIT WAS FORCED DOWN ONCE TO REPAIR A VENTURI PUMP AND SIX
                         OTHER TIMES DUE TO RESTRICTED VENTURI GAS FLOW.

 4/80  SYSTEM      97.3        96.4        96.8        82.7                  720   618    596  97.5

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         LEAKS IN THE VENTURI  LINE FORCED THE FGD SYSTEM OUT OF SERICE TWICE
                         DURING APRIL.

                         A THERMOCOUPLE SHORTED OUT DUE TO HIGH VENTURI GAS OUTLET TEMPERATURES.
                         THIS FORCED THE FGD SYSTEM OUT OF SERVICE FOR SEVERAL HOURS.

                         THE BOILER WAS OUT OF SERVICE FOR 117 HOURS DUE TO BOILER TUBE  LEAKS.

 5/80  SYSTEM      97.7        93.9        97.4        84.7                  744   672    630  96.7

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS DOWN THREE TIMES  IN MAY BECAUSE OF  LOW FLOW  THROUGH  THE
                         VENTURI.

                         A BOILER TRIP CAUSED  THE  FGD SYSTEM  TO BE OUT APPROXIMATELY  97  HOURS.

 6/80  SYSTEM      92.1        92.7        92.7        88.3                   720   686    636   95.9
                                             13-729

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 1 (CONT.)
_.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL    PER  BOILER   FGD    CAP.
                                                                S02   PART. HOURS HOURS   HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE NOZZLES IN THE VENTURI RACE TRACK HAD TO BE CLEANED SEVERAL TIMES THIS
                         MONTH.  TOTAL OUTAGE FOR THIS WAS APPROXIMATELY 48  HOURS.

                         THE FGD SYSTEM WAS FORCED OUT OF SERVICE WHEN THE EMERGENCY  SPRAY SYSTEM
                         FAILED.

                         THE FGD SYSTEM WAS OUT OF SERVICE TWICE DURING JUNE DUE TO BOILER OUTAGES.

  7/80  SYSTEM       87.1         94.9        86.7        84.0                  744    658     625   95.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS RETURNED TO SERVICE ON JULY 3, 1980 AFTER THE BOILER
                         TRIPPED THE SYSTEM OFF LINE.  THE GUILLOTINE DAMPER HAD TO BE REPAIRED
                         BEFORE THE FGD SYSTEM COULD RETURN  TO SERVICE.

                         THE FGD SYSTEM WAS OFF LINE FOR SEVERAL HOURS TO UNPLUG THE  VENTURI TRAY
                         AND RACETRACK.   MAINTENANCE WORK WAS ALSO DONE ON THE VENTURI  LINE.

                         A SCHEDULED BOILER OUTAGE CAUSED THE FGD SYSTEM TO  BE OFF  LINE  FOR ONE
                         DAY.

                         THE FGD SYSTEM WAS FORCED OUT OF SERVICE WHEN THE EMERGENCY  SPRAY SYSTEM
                         FAILED.   THE  ASH SLUICE  PUMP SHAFT  WAS REPAIRED DURING THIS  TIME.

  8/80  SYSTEM      86.1         85.5        83.7        71.5                  744    622     532   94.3

        ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  FGD  SYSTEM WAS OUT OF SERVICE FOR ALMOST 60 HOURS FOR  ROUTINE CLEANING
                         AND MAINTENANCE.

                          LOSS  OF  EMERGENCY SPRAY  KEPT THE FGD SYSTEM OFF LINE FOR SEVERAL HOURS.

                          BOILER RELATED OUTAGES CAUSED THE FGD SYSTEM NOT TO OPERATE  FOR OVER  100
                          HOURS.

                          THE  TRAY SPRAY  PUMP  BELTS WERE REPAIRED.

                          A DAMPER THAT FAILED TO  CLOSE TRIPPED THE FGD SYSTEM OFF  LINE DURING  THE
                          MONTH.

  9/80  SYSTEM      91.3        91.0        91.1        89.6                  720    709     645   93.9

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE  FGD SYSTEM  WENT  OFF  LINE SEVERAL TIMES  IN SEPTEMBER FOR  ROUTINE CLEAN-
                          ING AND MAINTENANCE.  THIS  ROUTINE  WORK  INCLUDED CLEANING  THE TRAYS AND
                          REPAIRING VENTURI,  ASH,  AND EFFLUENT  LINES.

                          A BOILER OUTAGE  KEPT THE FGO SYSTEM OFF  LINE FOR SEVERAL HOURS.

  10/80  SYSTEM      98.2        97.6        97.9        93.0                  744.    708     692

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE FGD SYSTEM WAS FORCED OUT  OF SERVICE DUE TO  A  FAILURE  OF THE ASH  SLUICE
                          SYSTEM WHICH LEAVES THE  SYSTEM WITH NO  FIRE PROTECTION.

                          REPAIRS TO THE ID FAN EXPANSION JOINT CAUSED APPROXIMATELY SEVEN HOURS
                          OF OUTAGE TIME.
                                             13-730

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         THE UNIT WAS FORCED OFF-LINE ONCE DURING THE MONTH FOR APPROXIMATELY TWO
                         HOURS.

11/80  SYSTEM     100.0       100.0       100.0        36.3                  720   262    262

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM AND THE BOILER WERE SHUTDOWN ON NOVEMBER 11 FOR A SCHEDULED
                         OVERHAUL.

                         DURING NOVEMBER THE FGD SYSTEM WAS SHUT DOWN WITH THE BOILER FOR A
                         SCHEDULED OUTAGE THAT LASTED SIX HOURS.

12/80  SYSTEM      80.7        77.4        74.8        52.5                  744   505    391

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         FORCED OUTAGE TIME DURING DECEMBER WAS CAUSED BY A VENTURI LINE LEAK, AND
                         A POWER INTERRUPTION.

                         A SCHEDULED OUTAGE KEPT THE UNIT OFF LINE UNTIL DECEMBER 9.  ANOTHER
                         OUTAGE WAS SCHEDULED TO RESET THE ID FAN WHICH LASTED APPROXIMATELY TWO
                         HOURS.

 1/81  SYSTEM      85.1        85.5        85.5        85.1                  744   741    633

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY THE FGD SYSTEM WAS REMOVED FROM SERVICE TO REPAIR LEAKS
                         ENCOUNTERED IN THE VENTURI.

 2/81  SYSTEM      42.8        54.3        54.2        42.7                  672   528    287

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY THE FGD SYSTEM WAS DOWN FOR APPROXIMATELY 384 HOURS DUE TO
                         SCHEDULED MAINTENANCE ON THE VENTURI TANK.

 3/81  SYSTEM      76.2        73.1        73.1        60.6                  744   617    451

       *« PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH THE BOILER WAS OUT OF SERVICE APPROXIMATELY 91 HOURS DUE TO
                         A TUBE LEAK.

                         ADDITIONAL UNIT OUTAGE TIME WAS DUE TO THE FAILURE OF THE AIR PREHEATER
                         DRIVE.

                         THE FGD SYSTEM WAS OUT OF SERVICE APPROXIMATELY 177 HOURS DUE TO REPAIRS
                         TO THE VENTURI TANK.

 4/81  SYSTEM      96.2        99.4        99.4        96.2                  720   697    693

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL PROBLEMS WERE ENCOUNTERED WITH THE BYPASS SYSTEM CAUSING
                         APPROXIMATELY 18 HOURS OF OUTAGE TIME.

                         ADDITIONAL OUTAGE TIME WAS DUE TO THE HIGH EXHAUST LOAD TEMPERATURE.

 5/81  SYSTEM      87.9        66.9        67.1        26.7                  744   296    198
                                             13-731

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

NEVADA POWER: REID GARDNER 1 (CONT. )
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   X  REMOVAL   PER   BOILER   FGD    CAP.
                                                                 S02   PART.  HOURS  HOURS   HOURS FACTOR


       **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MAY THE UNIT WAS DOWN PART OF THE  TIME  FOR  A SCHEDULED  OVERHAUL.

                         DURING MAY, LOW VENTURI FLOW CAUSED THE SYSTEM TO  SHUT DOWN FOR 97 HOURS.

  6/81  SYSTEM       94. Z        89.9         93.*        81.2                   720    650     584

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  EFFLUENT LINES WERE CLEANED DURING  JUNE  ACCOUNTING FOR 42  HOURS  OF
                         OUTAGE TIME.

                         THE  BOILER WAS SCHEDULED TO BE OFF-LINE PART OF JUNE TO  REPAIR  FEEDWATER
                         HEATERS.

  7/81  SYSTEM      100.0        99.0       100.0        95.2                   744    714     708

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED  NO FGD-RELATED OUTAGES  FOR THE MONTH  OF JULY.

  8/81  SYSTEM       98.7        98.5         98.7        92.9                   744    702     691

       »*  PROBLEMS/SOLUTIONS/COMMENTS

                         DOWN TIME WAS REQUIRED TO REPLACE A VALVE IN THE EMERGENCY SPRAY SYSTEM.

                         THE  SYSTEM WAS FORCED OUT OF SERVICE 4  HOURS WITH  HIGH DUCT PRESSURE
                          PROBLEMS.

  9/81  SYSTEM      96.0         90.5         95.0        76.9                   720    612     554

        «* PROBLEMS/SOLUTIONS/COMMENTS

                          SCRUBBER OUTAGE  TIME  WAS ATTRIBUTED TO  INSTRUMENTATION PROBLEMS AND  BOILER-
                          RELATED  PROBLEMS.   THE INSTRUMENTATION  REPAIRS REQUIRED  29 HOURS.

  10/81  SYSTEM        .0                                   .0                   744      0       0    .0

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          DURING OCTOBER THE FGD SYSTEM WAS DOWN  WITH  THE BOILER FOR A SCHEDULED
                          OVERHAUL.

  11/81  SYSTEM      94.7        78.4         61.3         8.5                   720     79      62

        «* PROBLEMS/SOLUTIONS/COMMENTS

                          THE SCHEDULED  OVERHAUL CONTINUED UNTIL  NOVEMBER 26.

                          HIGH PRESSURE  IN THE  DUCTWORK TRIPPED THE SYSTEM CAUSING TWO OUTAGES
                          DURING THE  MONTH.

  12/81  SYSTEM      100.0        96.3        95.8        99.6                   744    554     533

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          LOW UTILIZATION OF THE  FGO  SYSTEM DURING  DECEMBER  WAS DUE TO BOILER-RELATED
                          PROBLEMS.

  1/82  SYSTEM      96.5        96.0         93.0         92.1                   744    714     685
                                             13-732

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGO   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY THE VENTURI PUMP PLUGGED CAUSING SYSTEM DOWN TIME.

                         THE VENTURI PUMP DISC VALVE WAS REPLACED DURING THE MONTH.

                         THE SYSTEM WAS FORCED OFF-LINE FOR APPROXIMATELY FIVE HOURS DUE TO A HIGH
                         VENTURI OUTLET TEMPERATURE.

 2/82  SYSTEM      91.8        64.5        64.5        51.7                  672   538    347

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY THE FGD SYSTEM WAS DOWN FOR APPROXIMATELY 52 HOURS FOR
                         GENERAL MAINTENANCE AND REPAIRS.

 3/82  SYSTEM      91.1        91.0        91.1        90.8                  744   742    675

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH APPROXIMATELY 65 HOURS OF SYSTEM DOWN TIME WAS DUE TO A
                         HOLE  IN THE VENTURI LINE.

 4/82  SYSTEM      98.8        98.6        98.5        78.5                  720   573    565

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL THE FGD SYSTEM WAS OFF-LINE PART OF THE TIME TO CLEAN THE
                         ABSORBER TRAYS.

                         THE UNIT WAS SHUT DOWN ON APRIL 24 FOR A SCHEDULED MAINTENANCE OUTAGE.

 5/82  SYSTEM      95.8        90.4        92.6        92.6                  744   425    384

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SYSTEM WAS FORCED OFF-LINE TWICE DURING MAY DUE TO HIGH PRESSURE IN
                         THE ABSORBER DUCT.

 6/82  SYSTEM      50.2        77.2        77.2        50.2                  720   469    362

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JUNE THE SYSTEM WAS FORCED OFF-LINE FOR APPROXIMATELY 1 DAY DUE
                         TO A  PRESSURE TRIP IN THE ABSORBER DUCT.

                         THE FGD SYSTEM WAS TAKEN OFF-LINE ON JUNE 17 FOR GENERAL MAINTENANCE.  THE
                         OUTAGE LASTED THROUGH THE REST OF THE MONTH.

 7/82  SYSTEM      90.1        93.2        89.5        84.4                  744   673    628

       ** PROBLEMS/SOLUTIOHS/COMMENTS

                         THREE BOILER TRIPS OCCURRED DURING JULY DUE TO HIGH PRESSURE IN  THE
                         SCRUBBER DUCT.

                         THE REPAIR OF VENTURI PUMPS ACCOUNTED FOR OUTAGE TIME DURING JULY.

                         AN OUTAGE LASTING 25 HOURS OCCURRED DURING THE MONTH.  DURING THE OUTAGE,
                         THE ABSORBER TRAYS REQUIRED CLEANING.

                         REPAIRS ON A COAL PULVERIZER RESULTED IN APPROXIMATELY 39 HOURS  OF OUTAGE
                         TIME  FOR THE UNIT.
                                             13-733

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 1 (CONT.)
	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER  BOILER   F60    CAP.
                                                                S02   PART.  HOURS HOURS  HOURS  FACTOR


 8/82  SYSTEM      97.3        96.2        96.7         78.2                   744    605     581

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         A BOILER TUBE LEAK OCCURRED DURING AUGUST CAUSING  A 121 HOUR OUTAGE.

                         A LEAK  IN THE SPRAY NOZZLE RACE TRACK  FLANGE PRODUCED A 20 HOUR  OUTAGE
                         DURING  THE MONTH.

                         REPAIR  OF A BOILER DOOR CAUSED SOME DOWN TIME FOR  THE UNIT DURING AUGUST.

                         A BOILER TRIP OCCURRED DURING  THE MONTH DUE  TO HIGH DUCT  PRESSURE.

  9/82   SYSTEM       93.1        90.8        91.3         71.8                   720    570     517

        **  PR03LEMS/SOLUTIONS/COMMENTS

                         HIGH  DUCT PRESSURE FORCED A UNIT OUTAGE DURING SEPTEMBER.

                         THE UNIT WAS DOWN 150 HOURS DURING SEPTEMBER FOR AN ACID  CLEANING.

                         THE UNIT WAS DOWN APPROXIMATELY 3 HOURS DURING THE MONTH  DUE TO  HIGH  HOOD
                         TEMPERATURES.

                         THE FGD SYSTEM  WAS DOWN FOR APPROXIMATELY 50 HOURS DUE IN PART TO AN
                         INSPECTION OF THE ABSORBER TRAYS.

                         PART  OF THE 50  HOUR OUTAGE DURING SEPTEMBER  WAS ALSO DUE  TO REPAIRS BEING
                         MADE  ON THE RUBBER ABSORBER LINER.

 10/82  SYSTEM      99.5        99.0        99.*         92.1                   744    692     685

        ** PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER  TUBE  LEAKS ACCOUNTED FOR APPROXIMATELY 55 HOURS OF  DOWN TIME DURING
                         OCTOBER.

                         A CLEANING OF THE ABSORBER TRAYS FORCED AN OUTAGE  LASTING  4 HOURS.

 11/82  SYSTEM      96.8        93.8        96.5         86.9                   720    668     626

        »* PROBLEMS/SOLUTIONS/COMMENTS

                          A REHEATER TUBE LEAK  FORCED AN OUTAGE  OF APPROXIMATELY 47 HOURS  DURING
                          NOVEMBER.

                          ELECTRICAL PROBLEMS WITH  A FAN ACCOUNTED FOR 24 HOURS OF  DOWN TIME DURING
                          THE MONTH.

                          A PLUGGED  EFFLUENT SYSTEM RESULTED IN  APPROXIMATELY 23 HOURS OF  DOWN  TIME
                          DURING NOVEMBER.

 12/82  SYSTEM     100.0        99.3       100.0         97.3                   744    729     72^

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          APPROXIMATELY 20 HOURS  OF DOWN TIME DURING DECEMBER RESULTED FROM BOILER-
                          RELATED PROBLEMS»
  1/53  SYSTEM      82.0        96.3        82.0        82.0                  744   633
                                                                                           610
                                             13-734

-------
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGO   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SYSTEM WAS DOWN FOR ABOUT SIX DAYS DURING JANUARY TO CHANGE THE OIL IN
                         AN ID FAN.

 2/83  SYSTEM      93.2        93.2        92.6        85.7                  672   618    576

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY A VENTURI PUMP MOTOR SHORTED CAUSING A 46 HOUR OUTAGE.

                         BOILER-RELATED PROBLEMS RESULTED IN A 2 HOUR OUTAGE DURING THE MONTH.

                         THE UNIT WAS OUT OF SERVICE 48 HOURS DURING FEBRUARY FOR A SCHEDULED
                         OVERHAUL.

 3/83  SYSTEM      100.0        90.5       100.0        27.2                  744   223    202

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OUT OF SERVICE APPROXIMATELY 23 DAYS DURING MARCH FOR A
                         SCHEDULED OVERHAUL.

 4/83  SYSTEM      100.0       100.0       100.0       100.0                  720   720    720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING APRIL.

 5/83  SYSTEM      99.0        99.6        99.0        99.0                  744   739    736

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         HIGH PRESSURE IN THE SCRUBBER DUCTWORK FORCED AN OUTAGE IN APRIL LASTING
                         APPROXIMATELY 8 HOURS.

 6/83  SYSTEM      91.7        96.2        88.3        62.4                  720   467    449

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A SIX-HOUR OUTAGE DURING JUNE WAS REQUIRED TO CLEAN THE ABSORBER TRAYS.

                         A BOILER OUTAGE LASTING 35 HOURS WAS REQUIRED TO REPAIR A BURNER.

                         A WATER LEAK IN THE SCRUBBER VENTURI THROAT SPRAY SYSTEM ACCOUNTED FOR
                         APPROXIMATELY 53 HOURS OF DOWN TIME DURING JUNE.

                         A BOILER TUBE LEAK ACCOUNTED FOR APPROXIMATELY 12 HOURS OF OUTAGE TIME
                         DURING JUNE.

                         THE UNIT WAS OUT OF SERVICE APPROXIMATELY 165 HOURS DURING JUNE DUE  TO A
                         LACK OF POWER DEMAND.

 7/83  SYSTEM      79.6        73.2        74.6        59.9                  744   609    445

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN APPROXIMATELY 70 HOURS DURING JULY BECAUSE OF LOW  POWER
                         DEMAND.

                         THE UNIT WAS DOWN APPROXIMATELY 77 HOURS DURING THE MONTH DUE  TO MIS-
                         CELLANEOUS BOILER-RELATED PROBLEMS.
                                             13-733

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 1 (CONT.)
____	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER  BOILER   FGD    CAP.
                                                                S02   PART.  HOURS HOURS   HOURS  FACTOR

                         APPROXIMATELY ONE HOUR OF OUTAGE TIME DURING JULY  MAS CAUSED BY ABSORBER
                         DUCT PRESSURE PROBLEMS.

                         APPROXIMATELY 151 HOURS DURING THE MONTH WERE REQUIRED TO  CLEAN THE  AB-
                         SORBER TRAYS.

  8/83  SYSTEM       95.9        94.6        94.9        75.8                   744    596     564

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         APPROXIMATELY 48 HOURS OF DOWN TIME DURING  AUGUST  WAS DUE  TO A  LACK  OF
                         POWER DEMAND.

                         BOILER-RELATED  FORCED OUTAGES ACCOUNTED FOR APPROXIMATELY  IOZ HOURS  OF DOWN
                         TIME DURING THE MONTH.

                         AN  ABSORBER TRAY LEAK CAUSED A FORCED OUTAGE LASTING APPROXIMATELY 2  HOURS.

                         A  LEAK  IN THE VENTURI THROAT SPRAY SYSTEM (RACE TRACK) RESULTED IN
                         APPROXIMATELY Z HOURS OF DOWN'TIME DURING AUGUST.

                         A VENTURI THROAT LEAK FORCED AN OUTAGE DURING THE  MONTH  LASTING APPROX-
                         IMATELY  26 HOURS.

  9/83  SYSTEM     100.0        99.3      100.0        88.1                   720    639     634

        ** PROBLEMS/SOLUTIONS/COMMENTS

                         A  6 HOUR OUTAGE OCCURRED DURING THE MONTH DUE TO A LACK OF POWER DEMAND.

                         APPROXIMATELY 80 HOURS OF OUTAGE TIME DURING SEPTEMBER WAS DUE  TO BOILER-
                         RELATED  PROBLEMS SUCH AS TUBE  LEAKS, UNIT TRIPS AND BURNER PROBLEMS.

 10/83  SYSTEM     100.0         92.5      100.0         17.2                   744    138     128

        ** PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER  RELATED  PROBLEMS ACCOUNTED FOR OUTAGE TIME  DURING OCTOBER.

 11/83  SYSTEM      95.2         95.2        95.2         95.2                   720    720     685

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE ABSORBER  WAS DOWN APPROXIMATELY 11 HOURS DURING THE MONTH TO INSPECT
                          THE TRAYS.

                          PLUGGED ABSORBER TRAYS ACCOUNTED FOR APPROXIMATELY 19 HOURS OF  FGD SYSTEM
                          OUTAGE  TIME  DURING THE MONTH.

                          A PLUGGED EFFLUENT LINE ACCOUNTED FOR APPROXIMATELY 4 HOURS OF  OUTAGE TIME
                          DURING  NOVEMBER.

 12/83  SYSTEM      98.5        97.3        98.3         87.8                   744    671     653

        #* PROBLEMS/SOLUTIONS/COMMENTS

                          EXCESS VIBRATION  PROBLEMS WITH AN I.D. FAN  FORCED  AN OUTAGE LASTING  APPROX-
                          inA It LT i£ n UUK5»

                          BOILER RELATED  PROBLEMS ACCOUNTED FOR APPROXIMATELY 79 HOURS OF OUTAGE TIME
                          DURING DECEMBER.

  1/84  SYSTEM     100.0        98.4       100.0         94.7                   744    716     704
                                             13-736

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 198*

NEVADA POWER: REID GARDNER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT MAS DOWN APPROXIMATELY 40 HOURS DURING JANUARY DUE TO BOILER-
                         RELATED PROBLEMS.

 2/84  SYSTEM      96.3        95.3        95.8        84.9                  696   620    591

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT DURING FEBRUARY, THE FGD SYSTEM WAS OFF LINE
                         5.5 HOURS DUE TO THE CLEANING OF AN ABSORBER TRAY.

                         THE UNIT WAS DOWN APPROXIMATELY 79 HOURS DUE TO BOILER OUTAGES IN FEBRUARY.

                         THE FGD SYSTEM WAS DOWN 12.5 HOURS DURING FEBRUARY FOR DEFUSER CLEANING.

                         THE FGD SYSTEM WAS DOWN EIGHT HOURS DUE TO HIGH OUTLET DUCT PRESSURE.

 3/84  SYSTEM      96.7        96.6        96.6        93.8                  744   723    698

       *« PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF LINE 21.4 HOURS IN MARCH DUE TO A BOILER OUTAGE.

                         THE UTILITY REPORTED THAT THE FGO SYSTEM WAS OFF LINE 8.3 HOURS
                         TO CLEAN AN ABSORBER TRAY.

                         DUE TO A PROBLEM WITH THE REHEAT FAN, THE FGO SYSTEM WAS SHUT DOWN
                         APPROXIMATELY 6 HOURS DURING MARCH.

 4/84  SYSTEM      91.6        88.6        88.6        64.7                  720   526    466

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGO SYSTEM WAS DOWN 3.3 HOURS DURING APRIL TO REPAIR A VENTURI
                         LINE.

                         ON APRIL 2ND, 13TH, 18TH AND 19TH THE FGD SYSTEM WAS DOWN A TOTAL OF
                         37.2 HOURS DUE TO PLUGGED ABSORBER TRAYS.

                         THE FGD SYSTEM WAS DOWN APPROXIMATELY 13 HOURS DURING APRIL TO REPAIR AN
                         EFFLUENT LINE.

                         THE FGD SYSTEM WAS OFF LINE 2.4 HOURS DURING APRIL DUE TO A LEAK IN
                         A VENTURI LINE.

                         DURING APRIL THE FGD SYSTEM WAS DOWN 8 HOURS TO MAKE REPAIRS ON
                         THE VENTURI THROAT SPRAY SYSTEM.

                         DUE TO A BOILER OUTAGE, THE UNIT WAS SHUT DOWN APPROXIMATELY 194 HOURS
                         IN APRIL.

 5/84  SYSTEM      100.0       100.0       100.0        49.3                  744   343    367

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN APPROXIMATELY 377 HOURS IN MAY DUE TO BOILER
                         PROBLEMS.

 6/84  SYSTEM      100.0        99.8       100.0        93.9                  720   677    676
                                             13-737

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWERS REID GARDNER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILED   FGD    CAP.
                                                                S02   PART. HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF LINE APPROXIMATELY 44 HOURS IN JUNE  DUE  TO BOILER
                         RELATED PROBLEMS.

  7/84  SYSTEM      98.9        97.1        98.7        86.1                  744    660     641

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS OFF  LINE  APPROXIMATELY 1 HOUR IN  JUNE DUE TO HIGH
                         DUCT  PRESSURE.

                         THE UNIT WAS DOWN FOR APPROXIMATELY 36 HOURS DURING JULY  DUE TO
                         BOILER-RELATED PROBLEMS.

                         THE FGO SYSTEM WAS OFF  LINE FOR 7.5 HOURS DURING JULY IN  ORDER TO CLEAN
                         THE ABSORBER TRAY.

  8/84  SYSTEM      100.0        99.9       100.0        94.8                  744    706     706

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         UNIT  1 WAS DOWN FOR  38.5 HOURS IN AUGUST DUE TO BOILER RELATED
                         PROBLEMS.

  9/84  SYSTEM                                                                720

        **  PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR SEPTEMBER 1984.
                                             13-738

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER  1984
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY M/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW
 «* UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW
     BOILER FLUE GAS TEMPERATURE
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M
CU.M/S
C
 «* FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - '/.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*»* PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
     TYPE
     SUPPLIER
     PARTICLE REMOVAL EFFICENCY -7.

 ** PARTICLE SCRUBBER
     NUMSER
     INITIAL START-UP DATE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - LITER/CU.M
     PRESSURE DROP - KPA
     SUPERFICIAL GAS VELOCITY - M/S
     INLET GAS FLOW RATE - CU.M/S
     INLET GAS TEMPERATURE - C
     PARTICLE REMOVAL EFFICIENCY - 7.
             NEVADA POWER
             REID GARDNER
             2
             MOAPA
             NEVADA
             D
                43.
               516.
             ******
               331
               125
               110
               495
               125
(   .100 LB/MMBTU)
(  1.200 LB/MMBTU)
(«***** LB/MMBTU)
FOSTER WHEELER
PULVERIZED COAL
BASE
223.21 (
176.7 (
61. (
CONCRETE
3.8 (



473000 ACFM)
350 F)
200 FT)

12.6 FT)
             COAL
             BITUMINOUS
             28959.         (  12450 BTU/LB)
                             ******
                 8.00
             8.0-10.0
                 5.50
             5.0-6.0
                  .50
             0.5-1.0
                  .05
             ******
             MULTICLONE
             RESEARCH-COTTRELL
                75.0
              1
              4/74
             VENTURI TOWER
             FIXED THROAT
             N/A
             THYSSEN/CEA
             1.5 DIA X 18.0
             CARBON STEEL; HIGH ALLOY
             AISI 11105  NICKEL BASE/CHROMIUM-IRON-COPPER-MOLY
             NONE; ORGANIC
             N/A; NATURAL RUBBER
             NONE
               157.5
                 1.3
                 4.6
                50.3
               223.2
               176.7
                97.0
( 2500 GPM)
(10.0 GAL/1000ACF)
(18.5 IN-H20)
(  165.0 FT/S)
( 473000 ACFM)
(  350 F)
                                            13-739

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 2 (CONT.)
*** FGD SYSTEM

 *» GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE  REMOVAL  EFFICIENCY
     UNIT DESIGN S02 REMOVAL  EFFICIENCY  -  7.
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

  *» DESIGN AND  OPERATING PARAMETERS

  ** QUENCHER/PRESATURATOR
     CONSTRUCTION  MATERIAL GENERIC TYPE
     CONSTRUCTION  MATERIAL SPECIFIC  TYPE

  ** ABSORBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON  TYPE
     SUPPLIER
     DIMENSIONS -  FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
      SHELL  MATERIAL TRADE  NAME/COMMON TYPE
      LINER GENERIC MATERIAL
      LINER SPECIFIC MATERIAL
      LINER  MATERIAL TRADE  NAME/COMMON TYPE
      GAS CONTACTING DEVICE TYPE
      NUMBER  OF  CONTACTING  ZONES
      LIQUID  RECIRCULATION  RATE -  LITER/S
      L/G RATIO  - L/CU.M
      GAS-SIDE  PRESSURE  DROP - KPA
      SUFERFICAL GAS VELOCITY  - M/SEC
      S02 REMOVAL EFFICIENCY - X

  ** MIST ELIMINATOR
      PRE-MIST ELIMINATOR/MIST ELIMINATOR
      NUMBER  PER SYSTEM
      GENERIC TYPE
      SPECIFIC TYPE
      TRADE NAME/COMMON  TYPE
      CONFIGURATION
      NUMBER  OF  STAGES
      NUMBER OF  PASSES PER  STAGE
      PRESSURE DROP -  KPA
      CONSTRUCTION MATERIAL GENERIC TYPE
      CONSTRUCTION MATERIAL SPECIFIC TYPE

  #* REHEATER
      GENERIC TYPE
      SPECIFIC TYPE
      TRADE  NAME/COMMON  TYPE
      TEMPERATURE INCREASE  - C
      INLET FLUE GAS TEMPERATURE -  C
      NUMBER  OF  TUBES  PEP BUNDLE
      CONSTRUCTION MATERIAL GENERIC TYPE
      CONSTRUCTION MATERIAL SPECIFIC TYPE
 THROWAWAY PRODUCT
 WET SCRUBBING
 SODIUM CARBONATE
 NONE
 THYSSEN/CEA
 BECHTEL
 FULL SCALE
 RETROFIT
X   97.00
    90.00
  1
  4/74
  4/74
  9/71
 NR
 NR
 TRAY TOWER
 SIEVE TRAY
 N/A
 THYSSEN/CEA
 30.0 DIA
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 NATURAL RUBBER
 BLACK NATURAL RUBBER
 PERFORATED TRAYS
  1
    38.         (
      .2        (
      .7        (
     3.4        (
    91.2
 600 GPM)
 1.6 GAL/1000 ACF)
3.0 IN-H20)
11.0 FT/S)
 PRIMARY COLLECTOR
  1
 CENTRIFUGAL
 RADIAL VANE
 NR
 HORIZONTAL
     1
     1
      •1        (  .5 IN-H20)
 STAINLESS STEEL
 AUSTENITIC
 INDIRECT HOT AIR
 EXTERNAL HEAT EXCHANGER
 STEAM TUBE BUNDLE
    27.8        (   50 F)
    48-3        (  119 F)
   24
 CARBON STEEL
 AISI 1110
                                             13-740

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
NEVADA POWER: REID GARDNER 2 (CONT.)
 ** FANS
     NUMBER
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 »» TANKS
     SERVICE
      SCRUBBER  RECYCLE

  **  PUMPS
      SERVICE
      SCRUBBER  RECIRCULATION
      ABSORBER  RECIRCULATION

  **  SOLIDS CONCENTRATING/DEWATERING
      DEVICE

 ***  SLUDGE

  **  TREATMENT
      METHOD
      DEVICE
      PROPRIETARY  PROCESS

  ««  DISPOSAL
      NATURE
      TYPE
      LOCATION
      SITE  TRANSPORTATION  METHOD
      SITE  TREATMENT
CENTRIFUGAL
BUFFALO FORGE
UNIT
FORCED DRAFT
DRY
  223.21       (  473000 ACFM)
  176.7        (   350 F)
CARBON STEEL
NR
NR
NR
NR
NR
NR
NR
SCRUBBER INLET
CARBON STEEL
AISI 1110
NONE
N/A
SCRUBBER OUTLET
CARBON STEEL
AISI 1110
ORGANIC
INERT FLAKE-FILLED VINYL ESTER
MIX TANK
N/A
AGITATED TANK
NUMBER

   1


NUMBER
NONE
BLEED
N/A
N/A
FINAL
POND
ON-SITE
GRAVITY FLOW FROM INTERIM SLUDGE POND
CLAY LINING
                                             13-741

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER  1984

NEVADA POWER: REID GARDNER 2  (CONT.)
 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TREATMENT

 ** WATER BALANCE
     WATER  LOOP TYPE
     MAKEUP WATER  ADDITION  -  LITERS/S

 *« FGD  SPARE  CAPACITY  INDICES
     ABSORBER  - X

 ** FGD  SPARE  COMPONENT INDICES
     ABSORBER
                       INTERIM
                       POUD
                       ON-SITE
                       CLAY  LINING
                       CLOSED
                           9.8
                            .0
                            .0
(   155 GPM)
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR
  4/74  SYSTEM
                                                                              720
        ** PROBLEMS/SOLUTIONS/COMMENTS
  5/74  SYSTEM

  6/74  SYSTEM

  7/74  SYSTEM

  8/74  SYSTEM
THE FGD SYSTEM WAS PLACED IN SERVICE IN APRIL 1974.  THE SCRUBBING SYSTEM
DESIGN WAS BASED ON INFORMATION AND DATA OBTAINED FROM AN 8000-ACPM PILOT
PLANT PROGRAM CONDUCTED AT REID GARDNER IN 1971 AND 1972.

                                                    744

                                                    720

                                                    744
  9/74  SYSTEM

  10/74  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
                                                    744

                                                    720

                                                    744
                          THE UTILITY REPORTED THAT NO MAJOR PROBLEMS OCCURED SINCE STARTUP IN APRIL.
                          CURRENT OPERABILITIES ARE GREATER THAN 90X WHEN TRONA IS AVAILABLE.  WHEN
                          THE TRONA SUPPLY IS EXHAUSTED THE SCRUBBER IS SHUT DOWN.
  11/74   SYSTEM

         #*  PROBLEMS/SOLUTIONS/COMMENTS
                                                    720
                          FGD SYSTEM OPERATIONS HAVE ONLY BEEN INTERRUPTED BY INSUFFICIENT TRONA
                          SUPPLIES.  S02 REMOVAL EFFICENCIES HAVE BEEN IN THE 85X RANGE.  BECAUSE
                          OF A COAL STRIKE THE BOILER ONLY OPERATED TWO WEEKS IN NOVEMBER AND THEN AT
                          REDUCED  LOAD.  THERE ARE NO OUTSTANDING MECHANICAL OR PROCESS PROBLEMS
  12/74   SYSTEM
   1/75   SYSTEM                  94.0

         *»  PROBLEMS/SOLUTIONS/COMMENTS
                                                                              744
                                                    744
                          DURING JANUARY THE FGD SYSTEM OPERATED WITH A 94X OPERABILITY ON TRONA
                          SUPPLEMENTED WITH SODIUM CARBONATE-BRINE.  THE UTILITY REPORTED NO MAJOR
                          PROBLEMS FOR THE DECEMBER-JANUARY PERIOD.  THERE WAS, HOWEVER, A MINOR
                          PROBLEM WITH FREEZING SODIUM CARBONATE FEED LINES
   2/75   SYSTEM
                                90.0
                                                                              672

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  F6D   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         ROUTINE MECHANICAL PROBLEMS MERE ENCOUNTERED DURING FEBRUARY.

                         ROUTINE INSTRUMENTAL PROBLEMS WERE EXPERIENCED.

                         ABRASION OF RUBBER-LINED PIPES ACCOUNTED FOR SOME DOWNTIME.

                         THE  FGD SYSTEM PASSED A SECOND PERFORMANCE TEST DURING THE PERIOD.

                         SEAL WATER FILTERS WERE REPLACED IN FEBRUARY.

                         BOILER CONTROLS ACCOUNTED FOR SOME DOWNTIME IN FEBRUARY.

                         RECYCLE LINE STRAINER PLUGGING WAS A PROBLEM DURING THE PERIOD.

 3/75  SYSTEM      100.0                                  .0                  744     0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  BOILER WAS OUT OF SERVICE THROUGHOUT MARCH FOR A TURBINE OVERHAUL.

 4/75              100.0                                  .0
       SYSTEM                                                                720     0

 5/75  SYSTEM      100.0                                  .0                  744     0

 6/75  SYSTEM      100.0                                                      720

       *« PROBLEMS/SOLUTIONS/COMMENTS

                         THE  BOILER AND SCRUBBER WERE PLACED BACK IN SERVICE IN LATE JUNE AFTER THE
                         TURBINE OVERHAUL.  THE FGO SYSTEM ACCEPTANCE TEST HAS BEEN SCHEDULED FOR
                         JULY.

 7/75  SYSTEM                  85.0                                          744

 8/75  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A BROKEN BUCKET ELEVATOR CAUSED A FORCED FGD OUTAGE.

                         WORN RECIRCULATION PIPING CONTRIBUTED  TO THE FORCED FGD OUTAGE TIME.

                         A FORCED FGD OUTAGE WAS CAUSED BY A PUMP RUBBER  LINER FAILURE.

                         STRAINER PLUGGING CONTRIBUTED TO THE FORCED FGD  OUTAGE TIME.

 9/75  SYSTEM                  76.9                    69.0                  720   645    496

10/75  SYSTEM                  87.4                    62.0                  744   531    464

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THREE FORCED OUTAGES OCCURED DURING SEPTEMBER  AND OCTOBER.

                         A NECESSARY PUMP REPAIR FORCED THE FGD SYSTEM  OUT OF SERVICE DURING THE
                         OCTOBER - NOVEMBER PERIOD.

                         INSTRUMENT PLUGGING CAUSED AN FGD OUTAGE.

                         REPAIR OF PIPING LEAKAGE NECESSITATED  AN FGD OUTAGE.
                                             13-743

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER Z (CONT. )
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD    CAP.
                                                                S02   PART.  HOURS  HOURS   HOURS FACTOR


11/75  SYSTEM                  98.8                    82.7                   720    603     596

12/75  SYSTEM                                                                 744

  1/76  SYSTEM      68.7        66.3        66.3        61.6                   744    691     458

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          FROZEN  CARBONATE LINES  CONTRIBUTED  TO  FGD OUTAGE TIME.

                          A FGD OUTAGE WAS CAUSED BY  A PLUGGED PRESSURE-SENSING LINES.

                          DUCT PRESSURE TRIPS  CONTRIBUTED TO  FGD OUTAGE  TIME.

                          AN  OVERHAUL OF  A TRAY RECYCLE PUMP  WAS NECESSARY DURING  DECEMBER.

  2/76  SYSTEM       90.4        85.6        85.6        83.1                   696    675     578

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE UTILITY REPORTED FOUR SCRUBBER  INACTIVE  PERIODS DURING FEBRUARY, THREE
                          OF  WHICH  WERE SCRUBBER-RELATED OUTAGES.

                          34  HOURS  OF OUTAGE TIME WERE REQUIRED  TO UNPLUG A  VENTURI  PUMP.

                          CHEMICAL  DEPLETION CONTRIBUTED TO FGD  OUTAGE TIME.

                          SEAL WATER  PROBLEMS  WERE ENCOUNTERED DURING  FEBRUARY.

  3/76  SYSTEM      68.1         59.9        62.5        53.1                   744    660     395

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          TWO FGD FORCED  OUTAGES  OCCURED DURING  MARCH.

                          AN ELECTRICAL  FAILURE RESULTED  IN A 16 HOUR  FGD SYSTEM OUTAGE.

                          PLUGGING IN THE TRAY SYSTEM RESULTED IN A SUBSEQUENT OVERHAUL  OF THE TRAY
                          CYCLE  PUMPS, REQUIRING  221  HOURS OF DOWNTIME.

  4/76  SYSTEM      86.6         77.5        83.4        67.7                   730    630     488

        ** PROBLEMS/SOLUTIONS/COKMENTS

                          FOUR FORCED SCRUBBER OUTAGES WERE REPORTED BY  THE  UTILITY  FOR  APRIL.

                          PLUGGED SENSING LINES RESULTED  IN FGD  OUTAGE TIME.

                          A REHEATER  LEAK DURING  APRIL CAUSED DOWN TIME  FOR  REPAIRS.

                          A VENTURI RECYCLE  PUMP  SPOOL REPLACEMENT REQUIRED  FGD OUTAGE TIME.

                          A VENTURI RECYCLE  TANK  NEEDED  PATCHING DURING  THE  MONTH.

  5/76  SYSTEM      99.0        83.0         98.0         79.0                   744

  6/76  SYSTEM      95.3        86.8         87.0         82.2                   720    682     592

        »* PROBLEMS/SOLUTIONS/COMMENTS

                          PLUGGED VENTURI LINES  ACCOUNTED  FOR 6  HOURS  DURING MAY.

                          A 6 HOUR OUTAGE RESULTED  FROM  PLUGGED  SENSING  LINES.
                                             13-744

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

NEVADA POWER: REID GARDNER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         THE SCRUBBING SYSTEM WAS SHUTDOWN FOR 54 HOURS WHILE CEMENT WAS BEING
                         POURED IN THE SCRUBBER AREA.

 7/76  SYSTEM      94.2        82.3        91.2        59.9                  744   542    446

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A PROBLEM WITH A HIGH SOLIDS CONCENTRATION IN THE VENTURI SCRUBBING CYCLE
                         CONTRIBUTED TO FGD OUTAGE TIME.

                         THE REPLACMENT OF A RUBBER-LINED PIPE IN THE VENTURI SCRUBBER WAS
                         NECESSARY DURING JULY.

                         BOILER RELATED OUTAGES ACCOUNTED FOR 256 HOURS OF FGD SYSTEM DOWNTIME.

 8/76  SYSTEM      91.7        69.1        70.8        65.8                  744   709    490

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DEPLETION OF CHEMICAL ABSORBENT (TRONA) CONTRIBUTED TO FGD OUTAGE
                         TIME  (141 HOURS).

                         THE FGD  SYSTEM WAS OUT OF SERVICE 52 HOURS FOR BOILER RELATED PROBLEMS.

                         VENTURI  RECYCLE LINE LEAKING ACCOUNTED FOR 27 HOURS OF SCRUBBER
                         OUTAGE TIME.

                         THE THICKENER PLUGGED CAUSING 34 HOURS OF FGD SYSTEM DOWN TIME.

 9/76  SYSTEM      92.4        90.2        91.9        85.2                  720   681    614

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         PLUGGING IN THE ID FAN REFERENCE LINES RESULTED IN 36 HOURS OF OUTAGE TIME.

                         A  19  HOUR FGD SYSTEM SHUTDOWN WAS CAUSED BY A FALSE HIGH TEMPERATURE
                         READING  IN THE VENTURI DUE  TO WATER IN THE INSTRUMENT.

 10/76  SYSTEM      95.2        92.6        94.7        86.4                  744   694    643

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         FIVE  HOURS OF SCRUBBER OUTAGE TIME WAS CAUSED BY VENTURI GAS DAMPER
                         PROBLEMS.

                         REPLACEMENT OF THE CARBONATE FEED LINE ACCOUNTED FOR 16 HOURS OF FGO
                         SYSTEM OUTAGE.

                         PLUGGING IN THE SCRUBBER  EFFLUENT LINE CONTRIBUTED TO FGD SYSTEM
                         DOWN  TIME.

                         SCRUBBER OUTAGE TIME DUE  TO BOILER-RELATED  PROBLEMS AMOUNTED TO
                         APPROXIMATELY 66 HOURS.

 11/76  SYSTEM      51.9        60.1        60.1        51.9                  720   621    374

       *« PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS DOWN  FOR REPAIR  OF A CONDENSER TUBE  LEAK  AND BOTTOM ASH
                         NOZZLE.

                         DURING THE BOILER OUTAGE  THE SCRUBBER GUILLOTINE DAMPERS WERE BADLY
                         DAMAGED  WHEN  LIMIT SWITCH ADJUSTMENTS WERE  BEING MADE.   THE SCRUBBER
                         REMAINED OUT OF SERVICE FROM NOVEMBER 16  THROUGH THE  END OF THE  MONTH.
                                             13-745

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD   CAP.
                                                                502   PART. HOURS HOURS  HOURS  FACTOR


12/76  SYSTEM         .0                                   .0                   744    275       0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS DOWN THE ENTIRE MONTH OF DECEMBER FOR A SCHEDULED OVERHAUL.

                         THE FGD SYSTEM WAS UNAVAILABLE THROUGH DECEMBER AS DAMPER  REPAIRS HAD
                         NOT YET BEEN MADE.  FGD SYSTEM SERVICES WERE NOT REQUIRED  DURING THE
                         PERIOD.

  1/77  SYSTEM      100.0                                   .0                   744      0       0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCHEDULED BOILER  OVERHAUL CONTINUED THROUGH JANUARY.

  2/77  SYSTEM       92.7         79.0        89.3        60.8                   672    517     409

        **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  FGD SYSTEM WAS PUT BACK  IN SERVICE ON FEBRUARY 7 AFTER COMPLETION OF
                         THE  SCHEDULED BOILER  OVERHAUL.

                         A MINOR SCRUBBER OUTAGE RESULTED FROM A VENTURI PIPING LEAK.

                         DURING THE  LAST TWO DAYS  OF  FEBRUARY SOME FGD  SYSTEM ELECTRICAL  PROBLEMS
                         OCCURRED.

                         A MINOR SCRUBBER OUTAGE WAS  REQUIRED TO CLEAN  THE RECYCLE  TANK WASH TRAY.

  3/77  SYSTEM      88.5         86.3        86.9        76.4                   744    659     569

        ** PROBLEMS/SOLUTIONS/COMMENTS

                         A PLUGGED ABSORBER TRAY CONTRIBUTED TO THE  FGD SYSTEM OUTAGE TIME.

                          ELECTRICAL  PROBLEMS IN THE FGD SYSTEM WERE  EXPERIENCED DURING MARCH.

                         DUCT HI/10  PRESSURE SENSORS  TRIGGERED A NINE HOUR FGD SYSTEM SHUTDOWN.

                          ID FAN PRESSURE SENSORS FORCED THE FGD SYSTEM  OFF LINE FOR 28 HOURS
                          IN MARCH.

  4/77  SYSTEM      94.8         94.8         94.8        94.8                   720    720     683

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          37 HOURS  OF FORCED FGD SYSTEM OUTAGE TIME RESULTED FROM  A  LEAK  IN THE
                          VENTURI DISCHARGE  LINE.

  5/77  SYSTEM      98.7        89.8         96.1        63.2                   744    524     470

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          BOILER-RELATED  OUTAGES ACCOUNTED FOR  255 HOURS OF FGD SYSTEM DOWNTIME
                          IN MAY.

                          BOILER ASH  SLUICE  PUMPS WERE OUT OF SERVICE FOR  APPROXIMATELY  10 HOURS
                          IN MAY.   BECAUSE  THE  EMERGENCY SPRAY  SYSTEM WAS  UNAVAILABLE THE  FGD SYSTEM
                          WAS FORCED  OUT  OF  SERVICE.

  6/77  SYSTEM      95.1         93.3         94.4        82.8                   720    639     596
                                             13-746

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

NEVADA POWER: REID GARDNER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
•"•""• »™»««™ »H»«_»«*w _w«vm«__H ••«•____••*• _K«_««HM« K_v» •«»• ••«••• __»__ _•«« • _«_»

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          ID FAN SENSING  LINE PLUGGING FORCED THE SYSTEM OUT OF SERVICE FOR SEVEN
                          HOURS IN JUNE.

                          A BREAKER TRIP  RESULTED IN A LOSS OF BOILER CONTROL POWER FOR FIVE HOURS.

                          THE SPRAY NOZZLES  IN THE VENTURI PLUGGED CAUSING 28 HOURS OF FGD SYSTEM
                          OUTAGE.

 7/77  SYSTEM      40.0        41.6         40.6        40.0                  744   733    298

       *« PROBLEMS/SOLUTIONS/COMMENTS

                          SEVEN FORCED FGD OUTAGES WERE DUE TO SCRUBBER DUCT HI/LO PRESSURE TRIPS
                          DURING JULY.

                          ONE TWO HOUR OUTAGE WAS REQUIRED TO CORRECT A PLUGGING PROBLEM IN THE
                          VENTURI SPRAY NOZZLES DURING JULY.

 8/77  SYSTEM      88.0        91.3         86.8        79.4                  744   646    591

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          A LEAK IN THE VENTURI RECYCLE HEADER RESULTED IN AN FGD SYSTEM OUTAGE.

                          A SCRUBBER  DUCT HIGH/LOW BOILER TRIP OCCURRED RESULTING IN 35 HOURS OF
                          SCRUBBER OUTAGE TIME.

                          THERE WAS ONE 64 HOUR BOILER-RELATED OUTAGE DURING AUGUST.

 9/77  SYSTEM      67.7        64.4         66.5        64.1                  720   716    461

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          A LEAK IN THE VENTURI RECYCLE LINES RESULTED IN FORCED FGD SYSTEM OUTAGE
                          TIME.

                          TRAY RECYCLE PUMP  REPAIR NECESSITATED NEARLY SIX HOURS OF FGD SYSTEM
                          OUTAGE TIME.

                          DUCT HI/LO  PRESSURE SENSOR LINE PLUGGING PROBLEMS ACCOUNTED FOR 58 HOURS
                          OF FORCED FGD SYSTEM OUTAGE.

                          26 HOURS OF OUTAGE TIME OCCURRED WHEN THE ASH SLUICE SYSTEM WENT OUT OF
                          SERVICE.  THE FGD  SYSTEM IS  LEFT WITHOUT EMERGENCY SPRAYS WHEN THIS OCCURRS
                          SINCE THEY  ARE  INTEGRATED SYSTEMS.

                          TRAY PLUGGING RESULTED IN 96 HOURS OF FGD SYSTEM OUTAGE WHICH BEGAN ON
                          SEPTEMBER 27 AND CONTINUED THROUGH THE END OF THE MONTH.

                          THE FGD SYSTEM  WAS TAKEN OFF-LINE TO ALLOW CLEANING OF A SUCTION SCREEN
                          IN THE TRAY RECYCLE TANK.

10/77  SYSTEM      79.2        83.2         79.1        78.8                  744   704    586

       *« PROBLEMS/SOLUTIONS/COMMENTS

                          FGD SYSTEM  OUTAGE  TIME WAS NEEDED TO CLEAN A PLUGGED ABSORBER RECYCLE
                          TANK SCREEN.

                          A VENTURI TANK  SEPARATOR REQUIRED CLEANING CAUSING FGD SYSTEM DOWN TIME.
                                             13-747

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER  BOILER   FGD    CAP.
                                                                S02   PART.  HOURS HOURS   HOURS FACTOR

                         A HIGH SOLIDS LEVEL IN THE VENTURI RECYCLE SYSTEM  REQUIRED  THREE HOURS OF
                         DOWNTIME TO MAKE CORRECTIONS.

                         A SCRUBBER DUCT HIGH/LOW PRESSURE TRIP FORCED THE  BOILER  AND SCRUBBER
                         OUT OF SERVICE FOR 42 HOURS.

                         ID FAN LEAKS WERE PATCHED DURING OCTOBER.

11/77 SYSTEM       80.7           .0          .0          .0                   720     98      0

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS OUT OF SERVICE  FROM OCTOBER 31 UNTIL NOVEMBER 26 TO INSTALL
                         A NEW PRIMARY AIR FAN.

                         THE SCRUBBER WAS OUT OF SERVICE FOR  AN ID FAN ROTOR REPAIR.

 12/77  SYSTEM         .0           .0           .0          .0                   744    742      0

        »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCRUBBER MODULE WAS OUT OF SERVICE TO INSTALL  NEW WEAR  PLATES ON AN
                         ID  FAN ROTOR.

  1/78  SYSTEM       71.7        73.9        73.9         67.0                   744   675     499

        ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCRUBBER WENT BACK ON  LINE JANUARY 4 AFTER  THE INSTALLATION OF WEAR
                          PLATES ON AN ID  FAN ROTOR.

                          REPAIRS  ON THE  THICKNER OVERFLOW  PUMP CONTRIBUTED  TO FGD  SYSTEM OUTAGE
                          TIME.

                          SOME  SOLIDS BUILD UP  IN THE VENTURI  WAS ENCOUNTERED DURING  JANUARY.

  2/78  SYSTEM      92.9        91.9       92.5         87.0                   672    636     585

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          A DUCT  HIGH/LOW PRESSURE TRIP  CONTRIBUTED TO THE  FGD SYSTEM OUTAGE TIME.

                          THE BOILER WAS OUT  OF  SERVICE  FOR 40 HOURS DURING  FEBRUARY.

  3/78  SYSTEM     100.0        88.7       100.0         80.2                   744    672     596

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THERE WERE NO  FORCED  FGD SYSTEM OUTAGES DURING  MARCH HOWEVER,  THE SYSTEM
                          WAS SHUTDOWN  FOR 18 HOURS  WHEN THE  BOILER OPERATED AT LOW LOAD AND STABLE
                          FGO SYSTEM OPERATIONS  WERE NOT ATTAINABLE.

  4/78  SYSTEM     100.0        98.7       100.0         44.1                   720    321     317

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THERE WERE NO  FGD  SYSTEM RELATED  OUTAGES DURING APRIL.   THE BOILER WAS OUT
                          OF SERVICE FOR 403  HOURS  IN APRIL.

  5/78  SYSTEM      99.8        99.7        99.8        97.4                   744    727     724
                                             13-748

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER Z (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGO   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER MAS OFF FOR APPROXIMATELY 18 HOURS FOR REPAIRS ON THE COAL MILL
                         SPOKES.

                         A SCRUBBER CIRCUIT BREAKER TRIPPED AND CAUSED AN FGD SYSTEM OUTAGE OF
                         ABOUT ONE HOUR.

 6/78  SYSTEM      89.4        89.4        89.4        89.4                  720   720    644

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS OUT OF SERVICE FOR 76 HOURS FOR REPAIR OF A VENTURI
                         WATER BOX LEAK.

 7/78  SYSTEM      80.1        81.8        78.9        74.3                  744   676    553

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS OUT OF SERVICE FOR 43 HOURS DUE TO A BOILER TUBE LEAK.

                         HIGH DUCT PRESSURE WAS THE CAUSE OF A BOILER TRIP.  THE HIGH DUCT PRESSURE
                         WAS CAUSED BY A  FAULTY POSITIONER ON THE ID FAN CONTROLLER.

                         THE ID FAN EXPANSION JOINT ON THE SCRUBBER SIDE WAS REPLACED.

                         AN FGD OUTAGE OCCURRED WHEN A BOLT, WHICH FELL FROM THE FAN, CAUSED
                         VIBRATIONS.

                         A SECOND BOILER  TRIP DURING JULY WAS CAUSED BY AN UNDETERMINED SOURCE.

                         THE SUCTION  LINE FROM THE VENTURI DISCHARGE LINE TO THE EFFLUENT PUMPS HAD
                         TO BE CLEANED BECAUSE OF PLUGGING.

 8/78  SYSTEM      81.4        82.2        82.4        81.1                  744   733    403

       #* PROBLEMS/SOLUTIONS/COMMENTS

                         TWO SCHEDULED OUTAGES DURING AUGUST WERE NECESSARY TO CLEAN THE SCRUBBER
                         TRAY.

                         A SCHEDULED OUTAGE WAS NECESSARY TO CLEAN THE NOZZLES ON THE SCRUBBER
                         SFRAY RACK.  THE STAINLESS STEEL PIPE TO THE TRAY SPRAY NOZZLES WAS ALSO
                         REPLACED.

                         ON AUGUST 1 THE  SCRUBBER EXPERIENCED HIGH DUCT PRESSURE.  DURING THE
                         SUBSEQUENT OUTAGE A CLINKER WAS REMOVED FROM THE BOILER BOTTOM HOPPER.

                         ON AUGUST 3  IT WAS NECESSARY TO TAKE THE SCRUBBER OFF  LINE TO REPACK THE
                         VENTURI  PUMPS.

                         A THIRD OUTAGE IN AUGUST WAS CAUSED BY A LOSS OF THE BOILER ASH PANEL
                         CONTROL  POWER.   THIS LEFT THE SCRUBBER WITHOUT EMERGENCY SPRAY.

 9/78  SYSTEM      98.5        97.4        98.4        93.8                  720   693    675

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A SCRUBBER OUTAGE WAS NECESSARY DURING SEPTEMBER IN ORDER TO CLEAN THE
                         TRAY RECYCLE TAMK AS WELL AS THE TRAY AND SOME OF THE  LINES.

                         THREE BOILER RELATED OUTAGES WERE CAUSED BY PROBLEMS WITH A 10-KW
                         GENERATOR.  CONTROL POWER SURGES WERE BEING CAUSED BY  OVERVOLTAGE
                                             13-749

-------
UTILITY F60 SUPVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 2 (CONT.)
__	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X  REMOVAL   PER   BOILER   F6D    CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR

                         MOTOR TRIPS.

10/78  SYSTEM      96.2        95.0         96.0         92.1                   744   722    685

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING  OCTOBER  SCRUBBER  INSTRUMENTATION REPAIRS WERE PERFORMED.

                         THE  BOILER  WAS  FORCED OUT OF SERVICE  FOR  ABOUT 28  HOURS BECAUSE OF
                         BOILER  DRUM WATER  LEVEL  PROBLEMS.

 11/78 SYSTEM       97.5        93.2         93.6         35.9                   720   277    259

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         A FORCED  FGD  SYSTEM OUTAGE  OCCURRED DUE TO  HIGH DUCT PRESSURE.

                         WORK WAS  DONE ON ID FAN  CONTROLS DURING NOVEMBER.

                         THE  UNIT  WAS  SHUTDOWN ON NOVEMBER 12  FOR  SCHEDULED BOILER MAINTENANCE.
                         THE  UNIT  REMAINED  OUT OF SERVICE THROUGH  THE END OF THE MONTH.

 12/78  SYSTEM      95.9        44.9       100.0         13.3                   744   221     99

        ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  BOILER  WAS  OFF LINE  UNTIL  DECEMBER 26 WHEN A SCHEDULED MAINTENANCE
                         OUTAGE  WAS  COMPLETED.

                         THE  SCRUBBER  WAS TAKEN OUT  OF  SERVICE FOR 30 HOURS TO UNPLUG AN EFFLUENT
                          LINE.

                          WHILE THE SCRUBBER WAS  DOWN THE BOILER WAS  OUT OF  SERVICE SO THAT
                          PULVERIZER  REPAIRS COULD BE MADE.

  1/79  SYSTEM      82.9        81.3        81.3         73.9                   744   676    550  81.3

        «* PROBLEMS/SOLUTIONS/COMMENTS

                          THE FGD SYSTEM WAS TAKEN OUT OF SERVICE TO  CLEAN A TRAY SCREEN.

                          THE FGD SYSTEM WAS TAKEN OUT OF SERVICE TO  REPAIR  A LEAK IN THE VENTURI
                          RECYCLE LINE.

                          THE BOILER WAS DOWN 67  HOURS FOR TUBE LEAK  REPAIRS.

                          REPAIRS WERE MADE ON THE TRAY AND  SPRAY PUMP SYSTEMS.

                          A HIGH DUCT PRESSURE TRIP WAS RESPONSIBLE FOR A SIX HOUR OUTAGE.  THE
                          PRESSURE SENSING  LINES  WERE CLEANED.

                          THE SCRUBBER TRAY PUMP  MOTOR SHORTED  TO GROUND. THE 2C LOAD TRIPPED AND
                          POWER TO THE VENTURI RECYCLE PUMP  WAS LOST.  THERE WAS AN ADDITIONAL
                          SCRUBBER TRIP DUE TO HIGH DUCT PRESSURE DURING THIS SAME PERIOD.

  2/79  SYSTEM      96.2        93.1        93.2         87.9                   672   63«    591  87>0

        #* PROBLEMS/SOLUTIONS/COMMENTS

                          THE FGD SYSTEM WAS TAKEN OUT OF SERVICE TO  REPAIR  A LEAK IN THE VENTURI
                          LINE.

                          THE FGD SYSTEM WAS FORCED OUT OF SERVICE  BY A SCRUBBER POWER FAILURE.
                                             13-750

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         THE SCRUBBER WAS TAKEN OUT OF SERVICE BECAUSE A BREAK IN THE ASH WATER
                         CIRCULATING WATER  LINE RESULTED IN A LOSS OF EMERGENCY COOLING WATER.

                         THE FGD SYSTEM WAS FORCED OUT OF SERVICE BY A LEAK ON THE VENTURI RACE
                         TRACK SPRAY SECTION.  THE VENTURI RACE TRACK NOZZLES WERE CLEANED DURING
                         THE OUTAGE.

                         THE BOILER WAS OUT OF SERVICE 38 HOURS FOR TUBE LEAK REPAIRS.

 3/79  SYSTEM      97.9        96.7       100.0        89.4                  744   688    665  90.3

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCRUBBER WAS OUT OF SERVICE 63 HOURS WHILE BOILER TUBE LEAK REPAIRS
                         WERE-MADE.

                         THE BOILER WAS FORCED OUT BY A HIGH FURNACE PRESSURE TRIP.  WHILE THE
                         BOILER WAS DOWN, SENSING LINES WERE CLEANED ON THE SCRUBBER.

 4/79  SYSTEM      89.1        96.0         98.9        88.8                  720   666    639  91.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         A HIGH PRESSURE ALARM ON THE SCRUBBER DUCT TRIPPED THE SCRUBBER OFF LINE.
                         THE SCRUBBER PRESSURE SENSING LINES WERE CLEANED.  THIS OCCURRED TWICE
                         DURING THE MONTH OF APRIL AND ACCOUNTED FOR 79 HOURS OF OUTAGE TIME.

                         A BOILER  FURNACE BURNER WAS CLEANED DURING A 71 HOUR SCRUBBER OUTAGE
                         RESULTING FROM A HIGH PRESSURE ALARM.

                         A CONTROL POWER FAILURE OCCURRED CAUSING A SCRUBBER TRIP WHEN A 10 KW
                         GENERATOR WAS PUT  BACK IN SERVICE.

 5/79  SYSTEM      99.8        99.5         99.7        83.9                  744   627    624  93.2

       *»  PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS OUT OF SERVICE FOR ABOUT FIVE DAYS TO REPAIR TUBE LEAKS.

                         PRESSURE  SENSING  LINES ON THE SCRUBBER CONTROLS WERE CLEANED DURING
                         A TWO HOUR OUTAGE  AFTER THE SCRUBBER BEGAN HAVING CONTROL PROBLEMS.

 6/79  SYSTEM      91.1        87.1         89.2        73.5                  720   607    529  92.2

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCRUBBER WAS  FORCED OUT OF SERVICE DUE TO A VENTURI  PUMP POWER  LOSS.

                         20 HOURS  OF SCRUBBER OUTAGE TIME WAS REQUIRED TO REPAIR  VENTURI  PUMP
                         DISCHARGE VALVES.

                         THE BOILER WAS OUT OF SERVICE 127 HOURS DURING JUNE TO REPAIR HIGH
                         PRESSURE  HEATER TUBE  LEAKS, TO WELD A CAP ON THE HIGH PRESSURE HEATER,
                         TO WORK ON PRIMARY AIR FANS, AND TO REPAIR A BOILER TUBE LEAK.

                         SCRUBBER  OUTAGE TIME WAS REQUIRED TO CLEAN PRESSURE SENSING LINES.

                         THE SCRUBBER WAS  FORCED OUT OF SERVICE JUNE 30 BY A HIGH VENTURI OUTLET
                         TEMPERATURE TRIP.

 7/79  SYSTEM      84.3        90.0         93.4        77.6                   744    642    578   92.0
                                             13-751

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 2 (CONT.)
	__-	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION   7. REMOVAL   PER   BOILER   FGD   CAP.
                                                                 502   PART.  HOURS HOURS  HOURS FACTOR


       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCRUBBER OUTAGE WHICH  BEGAN JUNE 30 CONTINUED  UNTIL JULY 4.  DURING
                         THE OUTAGE  A BAD VENTURI TEMPERATURE PROBE  WAS REPLACED.  SOME  BOILER TUBE
                         REPAIRS  WERE MADE  AT THIS  TIME.

                         THE BOILER  AND  SCRUBBER WERE  OFF FOR 50 HOURS TO REPAIR A BOILER TUBE LEAK.

                         SCRUBBER AND BOILER TRIPPED OFF FOR ABOUT 50 HOURS.   THIS OUTAGE WAS
                         CAUSED BY A LOSS OF CONTROL AIR TO THE  SCRUBBER AND  A POWER LOSS TO THE
                         SCRUBBER AIR COMPRESSOR.

                         THE SENSING LINES  ON THE SCRUBBER WERE  CLEANED TO  PREVENT HIGH  SCRUBBER
                         DUCT  PRESSURE.  THE SYSTEM WAS OUT FOR  ABOUT 33 HOURS.

  8/79  SYSTEM      98.5        98.9         98.*        93.2                   744   701    693  92.9

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE  BOILER  WAS  SHUTDOWN  FOR ABOUT 40 HOURS  TO REPAIR A BOILER TUBE LEAK.

                          THE  SCRUBBER WAS OFF TO  REPAIR A LEAK  IN A  VENTURI PUMP DISCHARGE BODY.
                          THE  REPAIR  REQUIRED ABOUT  9 HOURS.

                          HIGH  PRESSURE  IN SCRUBBER  DUCT FORCED  THE SCRUBBER OUT OF SERVICE.
                          THE  SCRUBBER PRESSURE  SENSING LINES WERE CLEANED.

  9/79  SYSTEM      86.0        83.8        82.5        66.2                   720   569    477  92.0

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          DURING SEPTEMBER THE  SCRUBBER WENT OFF LINE WITH THE BOILER TO  REPAIR
                          BOILER TU3E LEAKS. THIS OCCURRED TWICE CAUSING A  TOTAL OF 126  HOURS OF
                          DOWN TIME.

                          SOME OUTAGE TIME WAS  REQUIRED TO UNPLUG EFFLUENT AND VENTURI LINES AND
                          TO CLEAN THE VENTURI  RACE  TRACK SPRAY  SECTIONS.

                          HIGH PRESSURE WAS  ENCOUNTERED TWICE  IN THE  SCRUBBER DUCT AND ONCE IN THE
                          BOILER FURNACE.  THIS CAUSED  SOME OUTAGE TIME TO CLEAN THE SCRUBBER
                          PRESSURE SENSING LINES.

                          THE SCRUBBER WAS DOWN WITH THE BOILER  SO REPAIRS TO THE MAIN STEAM DRAIN
                          LINE COULD BE CONDUCTED.

                          THE SCRUBSER WAS DOWN FOR  APPROXIMATELY SEVEN HOURS TO MAKE REPAIRS ON THE
                          CONTROL SYSTEM.

  10/79  SYSTEM     100.0        88.3       100.0        31.3                   744   263    233  91.8

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE SCRUBBER WAS DOWN FOR  13 HOURS  WITH THE BOILER DUE TO A MASTER FUEL
                          TRIP ON THE BOILER AND LATER FOR 41  HOURS FOR BOILER TUBE REPAIRS.

                          A BOILER TRIP OCCURRED ON OCTOBER 12 BECAUSE OF HIGH FURNACE PRESSURE   AN
                          EXPLOSION BLEW AN EXPANSION JOINT ON THE DISCHARGE OF A PRIMARY AIR FAN
                          THE BOILER OUTAGE CONTINUED THROUGH THE END OF THE MONTH AS GENERAL
                          MAINTENANCE WAS PERFORMED.

  11/79  SYSTEM      98.8        96.0        97.3        43.3                  720   325    312  92.0
                                             13-752

-------
                                                  UTILITY F60 SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGO   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCRUBBER AND BOILER DID NOT OPERATE UNTIL NOVEMBER 17 WHEN THE
                         SCHEDULED MAINTENANCE MAS COMPLETED.

                         THE SCRUBBER MAS FORCED OUT OF SERVICE FOR APPROXIMATELY THREE HOURS TO
                         RECTIFY A VIBRATIONS PROBLEM IN THE REHEATER FAN.

                         THE SCRUBBER MENT OFF LINE HHEN A TRAY SPRAY PUMP SHORTED TO GROUND
                         TRIPPING A SCRUBBER POWER LOAD CENTER.

12/79  SYSTEM       97.9         97.7        97.9        97.7                  744   744    727  92.6

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         A BOILER/SCRUBBER HIGH DUCT PRESSURE TRIP OCCURRED.  THE SCRUBBER PRESSURE
                         SENSING LINES WERE CLEANED.  THE TRIP ACCOUNTED FOR A LITTLE OVER AN HOUR
                         OF OUTAGE TIME.

                         THE CONTROL SYSTEM ON THE VENTURI DAMPER REQUIRED REPAIRS MHICH RESULTED
                         IN APPROXIMATELY THREE HOURS OF DOWN TIME.

                         THE SCRUBBER WAS SHUT DOWN TO MAKE REPAIRS ON THE EMERGENCY SPRAY SYSTEM
                         AND A  REHEATER  FAN BEARING.

                         DURING A MAINTENANCE CHECK FOR D. C. GROUNDING THE BOILER AND SCRUBBER
                         MERE FORCED OUT OF SERVICE FOR TWO HOURS.

  1/80  SYSTEM       97.4         94.5        96.9        81.6                  744   642    607  94.5

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY  THE SCRUBBER MAS TAKEN OFF LINE WITH THE BOILER TO REPLACE
                         THE REBUILT BOILER HIGH PRESSURE HEATER.  THIS OUTAGE LASTED APPROXIMATELY
                         112 HOURS.

                         REPAIRS WERE NEEDED ON THE LEFT HAND INTERCEPT VALVE ON THE TURBINE CAUSING
                         THE SCRUBBER TO BE TAKEN OFF LINE ONCE AGAIN WITH THE BOILER.

                         THE CLEANING OF THE VENTURI RACE TRACK NOZZLES ACCOUNTED FOR TWO SCRUBBER
                         OUTAGES TOTALLING 15 HOURS.

                         THE SCRUBBER MAS TAKEN OFF LINE FOR FOUR HOURS SO MAINTENANCE COULD BE PER-
                         FORMED ON THE ID FAN DAMPER CONTROLS.

  2/80  SYSTEM       96.9         96.9        96.9        96.9                  696   696    675  95.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCRUBBER HAS TAKEN OFF-LINE TMICE DURING FEBRUARY DUE TO A MALFUNCTION
                         OF THE ID FAN CONTROLS.  THE PRESSURE SENSING  LINES WERE CLEANED DURING
                         THE OUTAGE.

                         THE SCRUBBER RACE TRACK NOZZLES HAD TO BE CLEANED TMICE, REQUIRING APPROX-
                         IMATELY FOUR HOURS OF OUTAGE TIME.

                         THE DISCHARGE VALVE ON THE VENTURI RECYCLE  PUMP WAS REPLACED DURING
                         FEBRUARY.

                         REPAIRS WERE MADE ON THE SCRUBBER EMERGENCY SPRAY  LINE RESULTING IN ABOUT
                         FOUR HOURS OF OUTAGE TIME.

                         THE SCRUBBER HAD TO BE SHUT DOWN SO REPAIRS ON THE  ID  FAN DAMPER CONTROLS
                                             13-753

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   X REMOVAL    PER   BOILER   FGD    CAP.
                                                                 S02   PART.  HOURS  HOURS  HOURS FACTOR

                         COULD BE MADE.

  3/80  SYSTEM      98.4        97.5        97.5         97.5                   7*4    744    725  96.3

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH THE SCRUBBER WAS  TAKEN OFF LINE DUE TO THE  UNAVAILABILITY OF
                         THE  EMERGENCY SPRAY SYSTEM.  DURING THIS TIME MAINTENANCE WAS DONE ON THE
                         A AND B ASH SLUICE PUMPS.

                         LATER IN THE MONTH AN OUTAGE WAS CAUSED BY  A LEAK  IN THE EMERGENCY SPRAY
                         LINE.

                         PROBLEMS RELATED TO A LOW VENTURI FLOW  CAUSED FOUR HOURS OF OUTAGE TIME IN
                         MARCH.  NO CAUSE FOR THE FLOW  PROBLEM WAS REPORTED.

  4/80  SYSTEM      99.0        99.0        99.0         93.5                   720    680    673  97.0

        ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  FGD SYSTEM  WAS UNAVAILABLE FOR 7 HOURS  TO UNPLUG THE VENTURI RACE
                         TRACK.

                         THE  BOILER WAS  OUT OF SERVICE  FOR 40 HOURS  DUE TO  BOILER TUBE LEAKS.

  5/80  SYSTEM     100.0        86.3       100.0         14.3                   744    124    107  96.5

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE  FGD  OVERHAUL WAS COMPLETED EARLY IN MAY.

                          A BOILER  OVERHAUL WAS STARTED  AND COMPLETED DURING MAY.   THIS OUTAGE LASTED
                          ALMOST  23 DAYS.

  6/80  SYSTEM      99.6        97.5        99.5         73.4                   720    541    528  96.6

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE BOILER WAS OUT  OF SERVICE  SEVERAL TIMES DURING JUNE.  THIS CAUSED THE
                          FGD SYSTEM TO BE OUT  APPROXIMATELY 80 HOURS.

                          VENTURI RACE  TRACK  NOZZLES NEEDED TO BE UNPLUGGED  CAUSING THE FGD SYSTEM
                          OUT OF  SERVICE FOR  SEVERAL HOURS.

  7/80  SYSTEM      88.1        77.2        86.2         74.5                   744    718    554  93.3

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          BOILER  RELATED OUTAGES  KEPT THE FGD  SYSTEM  OUT OF  SERVICE FOR OVER 100
                          HOURS DURING  JUNE.   OVER HALF  OF  THIS OUTAGE TIME  WAS A  RESULT OF CONTROL
                          PROBLEMS WITH THE  BOILER AND FGD  SYSTEM.   THE BOILER WAS RUN WITHOUT THE
                          FGD SYSTEM IN ORDER TO  DETERMINE  IF  THE CONTROL PROBLEMS WERE FGD OR BOILER
                          RELATED.   PROBLEMS  WERE REPAIRED  IN  BOTH  CONTROL SYSTEMS.  THIS ALSO CAUSED
                          OVER 60 HOURS OF FGD  SYSTEM RELATED  DOWN  TIME.

                          PROBLEMS WITH THE BOTTOM HOPPER SEALS  CAUSED THE FGD SYSTEM TO GO DOWN.

                          THE FGD SYSTEM NEEDED TO BE OFF LINE  FOR  13 HOURS FOR INSTRUMENT CHECKS
                          AND MAINTENANCE.

                          THE FGD SYSTEM WAS FORCED OUT OF SERVICE  WHEN THE EMERGENCY SPRAY SYSTEM
                          FAILED.  THE ASH SLUICE PUMP SHAFT WAS REPAIRED DURING THIS TIME.

  3/80  SYSTEM      97.0        96.3        96.4        79.7                  744   613    591  93.9
                                             13-754

-------
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       «« PROBLEMS/SOLUTIONS/COMMENTS

                          LOSS OF EMERGENCY SPRAY KEPT THE FGD SYSTEM OFF LINE FOR ALMOST 20 HOURS.

                          BOILER RELATED OUTAGES CAUSED THE FGO SYSTEM NOT TO OPERATE FOR OVER 130
                          HOURS.

 9/80  SYSTEM      100.0                                  .0                  720     0      0

       *» PROBLEMS/SOLUTIONS/COMMENTS

                          THE FGD SYSTEM MAS 100X AVAILABLE DURING A SCHEDULED BOILER OVERHAUL IN
                          SEPTEMBER.

10/80  SYSTEM      100.0           .0                      .0                  744     0      0

       *» PROBLEMS/SOLUTIONS/COMMENTS

                          THE UNIT  OVERHAUL CONTINUED THROUGH THE MONTH OF OCTOBER.

11/80  SYSTEM       94.5         93.6        91.9        62.0                  720   273    447

       «* PROSLEMS/SOLUTIONS/COMMENTS

                          THE SCHEDULED OUTAGE CONTINUED UNTIL NOVEMBER 10.  THE UNIT WAS BROUGHT
                          ON  LINE AND REMAINED ON LINE UNTIL NOVEMBER 26 WHEN THE BOILER AMD FGD
                          SYSTEM WERE FORCED OUT OF SERVICE TWICE.

12/80  SYSTEM       99.5         99.2        99.5        97.8                  744   733    728

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          DURING DECEMBER  THE SYSTEM WAS SHUTDOWN APPROXIMATELY 12 HOURS FOR
                          SCHEDULED OUTAGES.

                          TWO FORCED OUTAGES OCCURRED DURING THE MONTH WHICH CAUSED THE SYSTEM TO
                          SHUT DOWN FOR APPROXIMATELY FOUR HOURS.

 1/81  SYSTEM       97.1         96.4        96.7        84.2                  744   649    626

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          DURING JANUARY A REHEATER FAN TRIPPED CAUSING ABOUT SIX HOURS OF DOWN
                          TIME.

                          THE SYSTEM WAS TAKEN OFF  LINE PART OF THE MONTH TO REPAIR A VENTURI  LINE
                          LEAK.

                          THE UNIT  WAS TAKEN OFF  LINE THREE TIMES IN JANUARY TO WORK ON THE
                          GENERATOR.

 2/81  SYSTEM       93.0         90.4        89.3        74.7                  672   555    502

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          DURING FEBRUARY  APPROXIMATELY 96 HOURS OF OUTAGE  TIME WAS DUE TO SCHEDULED
                          TESTING.

                          REPAIR OF A BOILER TUBE LEAK CAUSED  AN ADDITIONAL 39 HOURS OF OUTAGE TIME.

 3/81  SYSTEM       99.5         98.1        98.1        54.8                  744   416    408
                                             13-755

-------
UTILITY FGD SURVEY; OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER Z (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD    CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH THE BOILER WAS OUT OF SERVICE APPROXIMATELY  57 HOURS DUE TO
                         A TUBE LEAK.

                         THE BOILER WAS TAKEN OFF LINE ON MARCH 22 FOR A SCHEDULED MAINTENANCE
                         OVERHAUL.  THE UNIT REMAINED OFF LINE THROUGHOUT THE  MONTH.

                         SEVERAL BOILER TRIPS CAUSED AN ADDITIONAL 56 HOURS OF OUTAGE TIME.

  4/81 SYSTEM      100.0        94.6        94.6         7.4                  720     56      53

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL THE BOILER WAS OUT OE SERVICE APPROXIMATELY  664 HOURS DUE TO
                         A SCHEDULED MAINTENANCE OVERHAUL.

  5/81 SYSTEM       96.3        96.1        96.2        93.5                  744    724     696

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A LEAK IN THE VENTURI DISCHARGE LINE CAUSED ABOUT A DAY OUTAGE DURING
                         MAY.

                         THE BOILER WAS TAKEN OFF-LINE PART OF THE MONTH TO REMOVE ASH.

  6/81  SYSTEM       90.7        88.5        89.2        75.8                  720    616     546

        **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JUNE A VENTURI BOX LEAK CAUSED THE SYSTEM TO BE OFF-LINE FOR ABOUT
                         55 HOURS.

                         THE UNIT WAS OFF  LINE THREE DIFFERENT TIMES TO REMOVE ASH.

                         THE SYSTEM WAS TAKE OFF-LINE FOR 12 HOURS DUE TO EMERGENCY SPRAY  PROBLEMS.

  7/81  SYSTEM      98.8         97.4        98.5        78.4                  744    599     584

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          APPROXIMATELY  9 HOURS OF OUTAGE TIME WERE REQUIRED DURING THE MONTH TO
                          CLEAN THE TRAY SCREEN AND RECTIFY A SCRUBBER DUCT PRESSURE PROBLEM.

                          A STACK  INSPECTION WAS  CONDUCTED DURING THE MONTH.

  8/81  SYSTEM      98.4        98.1        98.3        95.5                  744    7Z4     710

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE  SYSTEM WAS OUT OF SERVICE 6 HOURS TO REPLACE A VALVE  IN THE EMERGENCY
                          SFRAY SYSTEM DURING AUGUST.

                          6 HOURS  OF OUTAGE TIME  WERE REQUIRED TO REPLACE A VALVE ON A VENTURI  PUMP
                          AND  TO CLEAN THE  VENTURI THROAT SPRAY  (RACE TRACK).

  9/81  SYSTEM      99.5        99.4         99.5        99.3                  720    719     715

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE  SCRUBBING  SYSTEM WAS SHUT DOWN  FOR 3 HOURS TO REPAIR  THE ID FAN ACCESS
                          DOOR.

 10/81  SYSTEM      99.8        99.1         99.1        65.7                  744    643     638

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT ID FAN PROBLEMS WERE ENCOUNTERED DURING OCTOBER.
                         LOW UTILIZATION WAS DUE TO PROBLEMS WITH THE BOILER.

11/81  SYSTEM     100.0        99.9        99.9        46.7                  720   336    336

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING NOVEMBER.  LOW UTILIZATION WAS CAUSED BY BOILER PROBLEMS.

12/81  SYSTEM       94.8        74.0        69.3        56.4                  744   567    419

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER RETURNED TO SERVICE ON DECEMBER 10 FOLLOWING THE OVERHAUL.

                         DURING DECEMBER TWO OUTAGES OCCURRED DUE TO PROBLEMS WITH THE EMERGENCY
                         SPRAY.

 1/82  SYSTEM       54.0        57.9        52.2        50.3                  744   647    374

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY THE SYSTEM WAS OFF-LINE APPROXIMATELY 272 HOURS DUE TO A
                         VENTURI  BOX LEAK.

                         THE REHEATER FAN BLOWER REQUIRED REPAIR DURING THE MONTH.

                         THE BOILER TRIPPED TWICE DURING THE MONTH BECAUSE OF HIGH SCRUBBER DUCT
                         PRESSURE.

 2/82  SYSTEM       49.9        48.3        48.3        47.1                  672   654    316

       ** PROSLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY THE BOILER WAS TRIPPED DUE TO HIGH PRESSURE IN THE SCRUBBER
                         DUCT.

 3/82  SYSTEM     100.0        100.0       100.0        67.7                  744   503    503

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER AND FGD SYSTEM WERE TAKEN OFF-LINE ON MARCH 21 FOR A SCHEDULED
                         OUTAGE.   THE UNIT REMAINED OFF-LINE THROUGHOUT THE REST OF TH1: MONTH.

 4/82  SYSTEM       99.4        96.5        55.3        47.0                  720   350    338

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SYSTEM WAS OFF-LINE UNTIL APRIL 12 DUE TO THE SCHEDULED OVERHAUL.

                         FGD OUTAGE TIME DURING THE MONTH WAS DUE TO REPAIRS BEING PERFORMED ON  THE
                         ABSORBER TRAY LINE.

 5/82  SYSTEM       99.8        98.4        98.4        86.5                  744   654    644

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MAY THE SYSTEM WAS FORCED DOWN FOR APPROXIMATELY TWO HOURS  TO  CLEAN
                         THE SENSING LINES.

 6/82  SYSTEM       94.4        97.5        91.8        80.6                  720   596    580
                                             13-757

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 2 (CONT.)
.	,_	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR



       »*  PROBLEMS/SOLUTIONS/COMMENTS

                          THE  SYSTEM WAS  SHUT  DOWN FOR APPROXIMATELY  38 HOURS DUE TO A BLOWN GASKET
                          IN THE  DISCHARGE PUMP  VALVE.

                          THE  SYSTEM WAS  TAKEN OFF-LINE  FOR  APPROXIMATELY SIX HOURS TO CONNECT THE
                          NEW  EMERGENCY SPRAY  SYSTEM.

                          THE  UNIT WAS FORCED  OFF-LINE APPROXIMATELY  86 HOURS DUE TO TUBE LEAKS.

  7/82  SYSTEM      94.5        71.7         92.1        63.4                  744   658    472

        **  PROBLEMS/SOLUTIONS/COMMENTS

                          A BOILER TUBE  LEAK RESULTED  IN APPROXIMATELY 62 HOURS OF OUTAGE TIME DURING
                          JULY.

                          OTHER  BOILER-RELATED PROBLEMS  ACCOUNTED FOR APPROXIMATELY 52 HOURS OF DOWN
                          TIME DURING  THE MONTH.

                          APPROXIMATELY  41 HOURS OF  OUTAGE TIME RESULTED FROM REPAIRS ON THE ABSORBER
                          TRAY TOWER SPRAY MECHANISM.

  8/82  SYSTEM     100.0        99.5        100.0        83.3                  744   622    619

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          A BOILER TUBE  LEAK OCCURRED  DURING AUGUST CAUSING A 97 HOUR OUTAGE.

                          HIGH DUCT PRESSURE FORCED  A  BOILER TRIP DURING AUGUST THAT RESULTED IN
                          APPROXIMATELY  2 HOURS  OF DOWN  TIME.

                          A HIGH PRESSURE HEATER LEAK  ACCOUNTED FOR ABOUT 26 HOURS OF OUTAGE TIME
                          DURING THE  MONTH.

  9/82  SYSTEM      99.1        85.3         98.8        74.4                  720   628    536

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          A HIGH PRESSURE HEATER LEAK  CAUSED AN OUTAGE LASTING 4 HOURS.

                          TWO OUTAGES DURING SEPTEMBER WERE  DUE TO BOILER TUBE LEAKS AND TOTALLED
                          APPROXIMATELY 174 HOURS.

                          HIGH DUCT PRESSURE ACCOUNTED FOR AN OUTAGE  DURING THE MONTH THAT LASTED
                          A LITTLE OVER ONE HOUR.


                          A VENTURI LINE LEAK RESULTED IN APPROXIMATELY 5 HOURS OF DOWN TIME DURING
                          SEPTEMBER.

  10/82  SYSTEM      98.8         96.4        98.6        81.2                  744   626    604

        ** PROBLEMS/SOLUTIONS/COMMENTS


                          A FIVE HOUR OUTAGE DURING OCTOBER RESULTED  FROM THE LOSS OF AN AIR
                          PREHEATER.


                          A HIGH PRESSURE HEATER LEAK CAUSED AN OUTAGE LASTING APPROXIMATELY 76
                          HOURS.


                          APPROXIMATELY 9 HOURS OF OUTAGE TIME RESULTED FROM A LEAKING ID FAN
                          EXPANSION JOINT.
                                             13-758

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                502  PART. HOURS HOURS  HOURS FACTOR

                         ADDITIONAL BOILER-RELATED PROBLEMS ALSO CONTRIBUTED TO DOWN TIME DURING
                         OCTOBER.

11/82  SYSTEM      100.0         95.9       100.0        10.4                  720    78     75

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OUT OF SERVICE FROM NOVEMBER 1 TO NOVEMBER 28 FOR A SCHEDULED
                         OVERHAUL.

                         A BOILER TRIP OCCURRED DURING NOVEMBER DUE TO HIGH DUCT PRESSURE.

12/82  SYSTEM       98.8         97.0         98.6        82.9                  744   636    617

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER TUBE LEAKS  ACCOUNTED FOR APPROXIMATELY 118 HOURS OF DOWN TIME DURING
                         DECEMBER.

                         A 9 HOUR OUTAGE RESULTED FROM ID FAN CONTROL PROBLEMS.

 1/83  SYSTEM       89.8         84.8         89.3        84.8                  744   744    631

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER PROBLEMS DUE TO HIGH DUCT PRESSURE ACCOUNTED FOR APPROXIMATELY 37
                         HOURS  OF DOWN TIME DURING JANUARY.

                         ELECTRICAL PROBLEMS WITH A REHEATER FAN FORCED AN OUTAGE LASTING ABOUT 14
                         HOURS.

                         THE REPAIR OF A LEAK  IN AN ID FAN RESULTED IN APPROXIMATELY 62 HOURS OF
                         OUTAGE TIME DURING JANUARY.

 2/83  SYSTEM       41.8         33.5         31.8        27.2                  672   545    183

       ** PROSLEMS/SOLUTIONS/COMMENTS

                         A 98 HOUR OUTAGE OCCURRED DURING FEBRUARY AS A RESULT OF BOILER TUBE LEAKS.

                         AN OVERLOADED ID FAN  MOTOR RESULTED IN APPROXIMATELY 16 DAYS OF OUTAGE TIME
                         DURING FEBRUARY.

 3/83  SYSTEM       79.6         78.7         78.4        74.1                  744   701    551

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         LOW FLOW THROUGH THE  VENTURI RESULTED IN APPROXIMATELY 4 HOURS OF DOWN TIME
                         DURING THE MONTH.

                         THE UNIT WAS DOWN  APPROXIMATELY 37 HOURS DURING MARCH FOR REPAIR WORK ON
                         BURNERS.

                         REPAIRS ON AN ID FAN  CONTINUED THROUGH MARCH CAUSING AN ADDITIONAL  131
                         HOURS  OF DOWN TIME.

                         REPAIRS ON A BYPASS DAMPER ACCOUNTED FOR 17 HOURS OF OUTAGE TIME DURING
                         MARCH.

                         HIGH DUCT PRESSURE ACCOUNTED FOR APPROXIMATELY 3 HOURS OF DOWN TIME FOR THE
                         UNIT.

                         AN ADDITIONAL HOUR OF DOWN TIME WAS ATTRIBUTED TO OTHER BOILER-RELATED
                         PROBLEMS.
                                             13-759

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER Z (CONT. )
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER  BOILER   FGD    CAP.
                                                                S02   PART.  HOURS HOURS   HOURS FACTOR


  4/83  SYSTEM      99.7        98.4        99.6        72.0                   720    527     518

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         A FORCED OUTAGE  LASTING APPROXIMATELY  2 HOURS OCCURRED DURING  APRIL  AND
                         WAS DUE TO HIGH  SCRUBBER DUCT PRESSURE.

                         THE UNIT WAS DOWN FOR APPROXIMATELY  15 HOURS DURING THE MONTH  FOR A
                         SCHEDULED OUTAGE TO REPAIR BURNERS.

                         A BOILER TRIP CAUSED A BRIEF 1-HOUR  OUTAGE  IN APRIL.

                         THE UNIT WAS OUT OF SERVICE FOR  APPROXIMATELY 184  HOURS DURING APRIL FOR A
                         SCHEDULED OVERHAUL.

  5/83  SYSTEM      97.1        74.9        89.1        23.4                   744    233     174

        ** PROBLEMS/SOLUTIONS/COttMENTS

                         THE SCHEDULED OVERHAUL WHICH BEGAN  IN  APRIL CONTINUED UNTIL MAY 23.

                         A HOT BEARING IN THE SCRUBBER I.D.  FAN MOTOR FORCED AN OUTAGE  IN MAY LAST-
                         ING ABOUT  18 HOURS.

                         A BRIEF TWO-HOUR OUTAGE OCCURRED DURING MAY DUE TO A BOILER TRIP.

  6/83  SYSTEM     100.0        94.0       100.0        77.0                   720    590     555

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          A TURBINE  TRIP  FORCED AN OUTAGE  IN  JUNE LASTING APPROXIMATELY  10 HOURS.

                          A BOILER TUBE  LEAK  RESULTED  IN ABOUT 70 HOURS OF DOWN TIME DURING THE
                          MONTH.

                          THE  UNIT WAS  OUT OF  SERVICE  APPROXIMATELY  85 HOURS DURING JUNE DUE TO A
                          LACK  OF  POWER DEMAND.

                          A ONE HOUR BOILER-RELATED  OUTAGE OCCURRED  DURING JUNE.

  7/83  SYSTEM      98.6        96.5        98.4        84.2                   744    649     627

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE UNIT WAS DOWN  APPROXIMATELY  53  HOURS DURING JULY DUE  TO LACK OF  POWER
                          DEMAND.

                          APPROXIMATELY 55 HOURS  OF  DOWN TIME DURING THE MONTH RESULTED  FROM BOILER-
                          RELATED  PROBLEMS.

                          AN INSPECTION OF THE VENTURI THROAT SPRAY  SYSTEM  (RACE  TRACK)  RESULTED IN
                          APPROXIMATELY 8 HOURS OF  OUTAGE  TIME.

                          A LOSS OF VENTURI  FLOW RESULTED  IN  APPROXIMATELY  3 HOURS OF DOWN TIME
                          DURING THE MONTH.

  8/83  SYSTEM      96.5        97.0        96.0         83.0                   7
-------
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGO   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         REPAIRS ON A STOP-VALVE FORCED AN OUTAGE LASTING 10 HOURS.

                         ABSORBER DUCT PRESSURE PROBLEMS ACCOUNTED FOR APPROXIMATELY 8 HOURS OF DOWN
                         TIME DURING THE MONTH.

                         VENTURI PUMP REPAIRS FORCED AN OUTAGE DURING AUGUST LASTING APPROXIMATELY
                         9 HOURS.

 9/83  SYSTEM      100.0         99.8       100.0        87.8                  720   63*    632

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         A BOILER TUBE LEAK AND UNIT TRIP ACCOUNTED FOR APPROXIMATELY 88 HOURS OF
                         OUTAGE TIME DURING SEPTEMBER.

10/83  SYSTEM      100.0         99.*       100.0        85.0                  7**   636    632

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER RELATED PROBLEMS AND A SCHEDULED OUTAGE ACCOUNTED FOR OUTAGE TIME
                         DURING OCTOBER.

11/83  SYSTEM       98.6         97.*        97.7        60.0                  720   **3    *32

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF LINE APPROXIMATELY 273 HOURS DURING NOVEMBER FOR A SCHED-
                         ULED OUTAGE.

                         HIGH ABSORBER DUCT PRESSURE ACCOUNTED FOR 6 HOURS OF FGD SYSTEM OUTAGE TIME
                         DURING THE MONTH.

                         BOILER RELATED PROBLEMS ACCOUNTED FOR APPROXIMATELY 5 HOURS OF OUTAGE TIME
                         DURING NOVEMBER.

                         APPROXIMATELY * HOURS OF OUTAGE TIME HAS REQUIRED TO REPAIR A VENTURI PUMP
                         MOTOR.

12/83  SYSTEM       97.5         96.9        97.3        90.9                  7**   697    676

       *« PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN APPROXIMATELY *9 HOURS DURING THE MONTH DUE TO BOILER
                         RELATED PROBLEMS.

                         A BADLY VIBRATING REHEAT BLOWER FORCED AN OUTAGE LASTING APPROXIMATELY 19
                         HOURS  DURING DECEMBER.

 1/8*  SYSTEM      100.0         96.6       100.0        92.8                  7**   715    690

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE UNIT WAS DOWN APPROXIMATELY 5* HOURS DUE TO
                         BOILER OUTAGES.

 2/8*  SYSTEM      100.0          .0                      .0                  696     0      0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN FOR THE ENTIRE MONTH BECAUSE OF A SCHEDULED OUTAGE.

 3/8*  SYSTEM       99.8         96.*        99.7        50.5                  7**   390    376
                                             13-761

-------
UTILITY FED SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 2 (CONT.)
_	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER  BOILER   FGD    CAP.
                                                                S02   PART. HOURS HOURS   HOURS FACTOR


       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE  FGD  SYSTEM WAS DOWN 1.3 HOURS DUE TO PROBLEMS
                         WITH  A BYPASS DAMPER.

                         THE UNIT WAS OFF LINE APPROXIMATELY  367 HOURS DUE TO BOILER-RELATED
                         PROBLEMS.

  4/84 SYSTEM       99.8       99.7         99.8         97.0                  720    701     699

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM  WAS OFF  LINE FOR  1.3  HOURS DURING APRIL DUE TO
                         ELECTRICAL  PROBLEMS.

                         DURING APRIL THE UNIT WAS OFF  LINE FOR 20 HOURS DUE TO BOILER  OUTAGES.

                         THE UTILITY REPORTED THAT THE  UNIT WAS DOWN  APPROXIMATELY  114  HOURS  DURING
                         APRIL DUE TO BOILER PROBLEMS.

  5/84  SYSTEM     100.0       100.0       100.0         99.9                  744    743     743

        »* PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MAY, THE UTILITY REPORTED THAT THE UNIT WAS  DOWN APPROXIMATELY
                          1 HOUR DUE  TO  A BOILER  OUTAGE.

  6/84  SYSTEM      99.3        99.0         99.2         94.2                  720    685     678

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          FOR  APPROXIMATELY  36 HOURS DURING  JUNE, THE  UNIT WAS DOWN  DUE  TO BOILER
                          OUTAGES.

                          DURING JUNE,  THE  FGD SYSTEM WAS  DOWN APPROXIMATELY  5 HOURS DUE TO
                          MAINTENANCE ON AN  INDUCED DRAFT  FAN.

  7/84  SYSTEM      97.9        82.4         97.1         70.8                  744    639     527

        «* PROBLEMS/SOLUTIONS/COMMENTS

                          DURING JULY,  THE  FGD SYSTEM WAS  DOWN 1.3 HOURS DUE  TO THE  CLOSING OF AN
                          INLET DAMPER.

                          ON JULY 23  AND 24, THE  FGD SYSTEM  WAS DOWN A TOTAL  OF 14.4 HOURS DUE TO
                          ABSORBER  DUCT PRESSURE  PROBLEMS.

                          THE UNIT  WAS  DOWN  APPROXIMATELY  202  HOURS IN JULY DUE TO BOILER RELATED
                          PROBLEMS.

  8/84  SYSTEM      97.9        97.6         97.9         97.4                  7^    743     725

        #* PROBLEMS/SOLUTIONS/COMMENTS

                          UNIT 2 WAS DOk'N FOR 16  HOURS  IN  AUGUST DUE TO A  LEAK IN  THE I.D. FAN
                          HOUSING.

                          DUPING AUGUST REID GARDNER  2  WAS DOWN  FOR 4  HOURS DUE TO  BOILER RELATED


  9/84  SYSTEM                                                                720
                                             13-762

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 198*

NEVADA POWER: REID GARDNER Z (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGO   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION MAS UNAVAILABLE FOR SEPTEMBER
                                             13-763

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER
                                           SECTION  13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL  DOMESTIC  FGD  SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION  LIMITATION - NG/J
S02 EMISSION  LIMITATION  - NG/J
NOX EMISSION  LIMITATION  - N3/J
NET PLANT GENERATING  CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

  ** UNIT DATA -  BOILER AND  STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER  FLUE  GAS FLOW - CU.M/S
     BOILER FLUE GAS  TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER  - M

  **  FUEL DATA
      FUEL TYPE
      FUEL GRADE
     AVERAGE  HEAT CONTENT - J/G
     RANGE HEAT  CONTENT  - BTU/LB
     AVERAGE  ASH CONTENT -  7.
     RANGE ASH CONTENT  - 7.
     AVERAGE  MOISTURE CONTENT  - 7.
     RAKGE MOISTURE CONTENT -  7.
      AVERAGE  SULFUR CONTENT -  7.
      RANGE SULFUR CONTENT - 7.
      AVERAGE  CHLORIDE CONTENT  - 7.
      RANGE CHLORIDE CONTENT -  7.

 *** PARTICLE  CONTROL

  ** MECHANICAL COLLECTOR
      TYPE
      SUPPLIER
      PARTICLE REMOVAL EFFICENCY -7.

  «* PARTICLE  SCRUBBER
      NUMBER
      INITIAL START-UP DATE
      GENERIC  TYPE
      SPECIFIC TYPE
      TRADE  NAME/COMMON  NAME
      SUPPLIER
      DIMENSIONS - FT
      SHELL  GENERIC MATERIAL
      SHELL  SPECIFIC MATERIAL
      LINER  GENERIC MATERIAL
      LINER  SPECIFIC MATERIAL
      GAS CONTACTING DEVICE  TYPE
      NUMBER  OF CONTACTING  ZONES
      LIQUID  RECIRCULATION  RATE -  LITER/S
      L/G RATIO - LITER/CU.M
      PRESSURE DROP -  KPA
      SUPERFICIAL GAS  VELOCITY  - M/S
      INLET  GAS FLOW RATE -  CU.M/S
      INLET  GAS TEMPERATURE  - C
      PARTICLE REMOVAL EFFICIENCY  - 7.
NEVADA POWER
REID GARDNER
3
MOAPA
NEVADA
D
   43.
  516.
««**M*
  105
  125
  110
  495
  125
(   .100 LB/MMBTU)
(  1.200 LB/MMBTU)
(**»*** LB/MMBTU)
FOSTER WHEELER
PULVERIZED COAL
BASE
223.21 (
176.7 (
61. (
CONCRETE
6.3 (



473000 ACFM)
350 F)
200 FT)

20.6 FT)
COAL
BITUMINOUS
28959.

    8.00
8.0-10.0
    9.00
5.5-6.0
      .50
(  12450 BTU/LB)
 ******
0.5-1,
      0
      05
MULTICLONE
RESEARCH-COTTRELL
   75.0
 1
 6/76
VENTURI TOWER
FIXED THROAT
N/A
THYSSEN/CEA
1.5 DIA X 18.0
CARBON STEEL; HIGH ALLOY
AISI 1110; NICKEL BASE/CHROMIUM-IRON-COPPER-MOLY
NONE; ORGANIC
N/A; NATURAL RUBBER
NONE
  157.5
    1.3
      .8
   50.3
  223.2
  176.7
   97.0
(  2500 GPM)
(10.0 GAL/1000ACF)
(  3.3 IN-H20)
(   165.0 FT/S)
(  473000 ACFM)
(   350 F)
                                             13-764

-------
NEVADA POWER: REID GARDNER 3 (CONT.)
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*
*** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PROOUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS

 ** GUENCHER/PRESATURATCR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE -  LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     S02 REMOVAL EFFICIENCY - 7.

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NJME/COMMON TYPE
     TEMPERATURE INCREASE - C
     INLET FLUE GAS TEMPERATURE - C
     NUI13ER OF TUBES PER BUNDLE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
   THROWAWAY PRODUCT
   WET SCRUBBING
   SODIUM CARBONATE
   NONE
   THYSSEN/CEA
   BECHTEL
   FULL SCALE
   NEW
- 7.   99.00
      65.00
    1
    7/76
    6/76
    7/73
   NR
   NR
   TRAY TOWER
   SIEVE TRAY
   N/A
   THYSSEN/CEA
   30.0 OIA
   CARBON STEEL
   AISI 1110
   N/A
   ORGANIC
   NATURAL RUBBER
   BLACK NATURAL RUBBER
   PERFORATED TRAYS
    1
      38.         (
        .2        (
        .7        (
       3.*        (
      91.2
 600 GPM)
 1.6 GAL/1000 ACF)
3.0 IN-H20)
11.0 FT/S)
   PRIMARY COLLECTOR
    1
   CENTRIFUGAL
   RADIAL VANE
   NR
   HORIZONTAL
       1
       1
        .1        (   .5 IN-H20)
   STAINLESS STEEL
   AUSTENITIC
   INDIRECT HOT AIR
   EXTERNAL HEAT EXCHANGER
   STEAM TUBE BUNDLE
      27.8        (   50 F)
      48.3        (  119 F)
     24
   CARBON STEEL
   AISI 1110
                                            13-765

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198<*

NEVADA POWER: REID GARDNER 3 (CONT.)
 ** FANS
     NUMBER
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS  FLOW RATE - CU.M/S
     FLUE GAS  TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC  TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC  TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC  MATERIAL TYPE

  ** DUCTWORK
      LOCATION
       SHELL GENERIC  MATERIAL TYPE
       SHELL SPECIFIC MATERIAL  TYPE
       LINER GENERIC  MATERIAL TYPE
       LIHER SPECIFIC MATERIAL  TYPE

  **  DUCTWORK
      LOCATION
       SHELL GENERIC  MATERIAL TYPE
       SHELL SPECIFIC MATERIAL  TYPE
       LINER GENERIC  MATERIAL TYPE
       LINER  SPECIFIC MATERIAL  TYPE

  ** REAGENT PREPARATION EQUIPMENT
      FUNCTION
      DEVICE
      DEVICE  TYPE

  »» TANKS
      SERVICE
      SCRUBBER RECYCLE

  »* PUMPS
      SERVICE
      SCRUSSER RECIRCULATION
      ABSORBER RECIRCULATION

  ** SOLIDS CONCENTRATING/DEWATERING
      DEVICE

 *** SLUDGE

  ** TREATMENT
      METHOD
      DEVICE
      PROPRIETARY PROCESS

  ** DISPOSAL
      NATURE
      TYPE
      LOCATION
      SITE TREATMENT
               ( 473000 ACFM)
               (  350 F)
CENTRIFUGAL
BUFFALO FORGE
UNIT
FORCED DRAFT
DRY
  223.21
  176.7
CARBON STEEL
NR
NR
NR
NR
NR
NR
NR
SCRUBBER INLET
CARBON STEEL
AISI 1110
NONE
N/A
SCRUBBER OUTLET
CARBON STEEL
AISI 1110
ORGANIC
INERT FLAKE-FILLED VINYL ESTER
MIX TANK
N/A
AGITATED TANK
NUMBER

   1


NUMBER
NONE
BLEED
N/A
N/A
INTERIM
PONO
ON-SITE
CLAY LINING
                                             13-766

-------
NEVADA POWER: REID GARDNER 3 (CONT.)
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT

 ** WATER BALANCE
     WATER LOOP TYPE
     MAKEUP WATER ADDITION -  LITERS/S

 «* FGD SPARE CAPACITY  INDICES
     ABSORBER - X

 ** FGD SPARE COMPONENT INDICES
     ABSORBER
     FINAL
     POND
     ON-SITE
     GRAVITY FLOW FROM INTERIM SLUDGE POND
     CLAY LINING
     CLOSED
         9.8
          .0
                                                      .0
                                                              (   155 GPM)
	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY  OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
  7/76   SYSTEM       82.0         45.9

        **  PROBLEMS/SOLUTIONS/COMMENTS
70.4
                                                      42.7
744   692
                                               318
                           INITIAL BOILER  TESTING  OPERATIONS BEGAN IN EARLY APRIL 1976.  INITIAL FLUE
                           GAS SCRUBBING SYSTEM TESTING BEGAN  IN  LATE JUNE 1976.

                           THE UNIT 3 SCRUBBING SYSTEM WAS  PLACED IN OPERATION ON JULY 12, 1976.  THE
                           SYSTEM DESIGN WAS  BASED ON INFORMATION AND DATA OBTAINED FROM AN 8000-ACFM
                           PILOT PLANT PROGRAM CONDUCTED  AT THIS  STATION IN 1971 AND 1972.

                           A HIGH SOLIDS CONCENTRATION IN THE  VENTURI SCRUBBING SOLUTION CYCLE WAS
                           A PROBLEM DURING JULY.

                           FOUR OUTAGES WERE  REPORTED FOR THE  MONTH, THREE OF WHICH WERE FORCED
                           SCRUBBER OUTAGES.

                           A BUCKET ELEVATOR  MALFUNCTION  WAS A PROBLEM DURING JULY FORCING THE SYSTEM
                           OUT OF SERVICE  FOR 109  HOURS.
                                            43.2
            43.2
                                  744   744
8/76  SYSTEM      43.2        43.2

      «* PROBLEMS/SOLUTIONS/COMMENTS

                         A REHEATER MOTOR BURNOUT OCCURRED IN AUGUST.

                         THE VENTURI FLOOR WAS EFFECTIVELY DESTROYED DURING AUGUST.

                         SCRUBBER OUTAGE TIME WAS REQUIRED TO REPAIR AN ID FAN ELECTRICAL
                         MALFUNCTION AND TO INSTALL ID FAN INSULATION.

                         THICKENER TANK PLUGGING CAUSED FGD DOWN TIME.

                         SCRUBBER OUTAGES TOTALLED 423 HOURS IN AUGUST.

9/76  SYSTEM      50.6        46.2        46.9        43.6

      ** PROBLEMS/SOLUTIONS/COKMENTS
             321
                                                                              720    679
                                               314
                           THE  SYSTEM WAS PLACED  BACK  IN SERVICE  ON SEPTEMBER  14  IN  FOLLOWING EXTEN-
                           SIVE REPAIRS AND  MODIFICATIONS FROM THE  PRECEEDING  MONTH.

                           A  VENTURI  VIBRATION TRIP RESULTED  IN NEARLY 14 HOURS OF FGD  SYSTEM OUTAGE
                           TIME.

                           TWO  REHEATER FAN  TRIPS OCCURRED IN SEPTEMBER ACCOUNTING FOR  14 HOURS OF
                                             13-767

-------
UTILITY F60 SURVEY: OCTOBER 1933 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 3 (CONT. )
	_„	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGO   CAP.
                                                                S02   PART.  HOURS HOURS   HOURS FACTOR

                          FGD SYSTEM OUTAGE TIME.

10/76  SYSTEM       21.0        28.4        28.4         20.9                   744   548     155

       **  PROBLEMS/SOLUTIONS/COMMENTS

                          HIGH SOLIDS CONTENT  IN THE VENTURI RECYCLE  SOLUTION RESULTED  IN 26 HOURS
                          OF SCRUBBER OUTAGE TIME.

                          A SCRUBBER GAS DAMPER MALFUNCTION FORCED THE  FGD  SYSTEM OUT OF SERVICE FOR
                          FOUR HOURS.

                          VENTURI  BOX LEAKS WERE ENCOUNTERED FORCING  THE SCRUBBER OUT OF SERVICE
                          FROM OCTOBER 8 THROUGH THE END  OF THE MONTH.

 11/76   SYSTEM      28.5        68.7        68.7         28.5                   720   298     205

        »*  PROBLEMS/SOLUTIONS/COMMENTS

                          THE SCRUBBING SYSTEM WAS OUT  OF SERVICE THE FIRST HALF OF NOVEMBER AS
                          REPAIRS  OF  LEAKS IN  THE VENTURI SCRUBBER BOX  CONTINUED.  THE  SYSTEM WAS
                          RESTARTED ON NOVEMBER 19.

                          A SCREW  CONVEYOR MALFUNCTION  (PREVENTING CHEMICAL MIXING) RESULTING IN
                          68 HOURS OF SCRUBBER OUTAGE TIME.

 12/76  SYSTEM      99.0         97.0        98.9         97.0                   744   744     722

        ** PROBLEMS/SOLUTIONS/COMMENTS

                           A BOILER HIGH TEMPERATURE TRIP  FORCED THE SCRUBBER OUT OF SERVICE FOR 14
                           HOURS  EARLY  IN  DECEMBER.

                           ONE MINOR  EIGHT HOUR SCRUBBER OUTAGE OCCURRED WHEN REPAIRS WERE MADE ON
                           THE  ID FAN  EXPANSION JOINT.

  1/77  SYSTEM      98.3        93.3         98.3         97.1                   744   735     723

        ** PROBLEMS/SOLUTIONS/COMMENTS

                           THE  FGD  SYSTEM  WAS OUT OF SERVICE NEARLY NINE HOURS FOR BOILER-RELATED
                           PROBLEMS.

                           A  PLUGGED  TRAY  OCCURRED  IN JANUARY RESULTING  IN  3.5 HOURS OF  FGD SYSTEM
                           OUTAGE TIME.

                           A  REHEATER  STEAM  LEAK RESULTED  IN A MINOR NINE HOUR FGD SYSTEM FORCED
                           OUTAGE.

  2/77  SYSTEM      74.5        69.7         70.0         59.6                   672   575     400

        ** PROBLEMS/SOLUTIONS/COMMENTS

                           THREE FORCED  SCRUBBER OUTAGES WERE CAUSED BY  HIGH DIFFERENTIAL PRESSURE
                           PROBLEMS IN THE SCRUBBER  TRAY AMMOUNTING TO 117  HOURS.

                           A 54 HOUR  OUTAGE  WAS REQUIRED TO CLEAN  OUT  A SODIUM CARBONATE LINE.

  3/77  SYSTEM      43.5        51.6         51.6         43.5                   7<^   627
                                             13-768

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       *» PROBLEMS/SOLUTIONS/COMMENTS

                          THE RUBBER LINING IN THE SEPARATOR REQUIRED 167 HOURS OF DOW.JTIME IN
                          MARCH FOR CURING.

                          THE SCRUBBER FAN EXPANSION JOINT BLEW OUT CAUSING 225 HOURS OF OUTAGE
                          TIME.

                          A  25 HOUR OUTAGE WAS REQUIRED TO CLEAN A PLUGGED TRAY.

                          A  SCRUBBER LIMIT SWITCH TRIPPED THE SCRUBBER OFF FOR THREE HOURS DURING
                          MARCH.

 4/77  SYSTEM       85.8       84.6        85.5        83.3                  720   709    600

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          A  HIGH  TRAY DIFFERENTAL PRESSURE RESULTED IN 86 HOURS OF FGD SYSTEM
                          'DOWN TIME.

                          A  PLUGGED STRAINER  IN  THE TRAY RECYCLE TANK OCCURRED CAUSING 16 HOURS OF
                          OUTAGE  TIME.

                          THE SCRUBBER WAS OFF LINE 18 HOURS FOR BOILER-RELATED PROBLEMS IN EARLY
                          APRIL.

 5/77  SYSTEM       62.8       26.3        97.7        16.6                  744   470    124

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE MODULE WAS UNAVAILABLE DURING THE FIRST THREE WEEKS OF THE MONTH
                          BECAUSE OF A FORCED OUTAGE REQUIRED FOR THE REPLACEMENT OF THE FRP LINER
                          IN THE  SCRUBBER SEPARATOR SECTION.  MOST OF THIS SCRUBBER OUTAGE TIME
                          COINCIDED WITH A BOILER OUTAGE.

                          APPROXIMATELY  1.4 HOURS OF SCRUBBER OUTAGE TIME WERE REQUIRED TO REWIRE
                          A  REHEATER FAN CIRCUIT BREAKER.

                          REPAIR  OF VENTURI DAMPER CONTROLS REQUIRED 1.5 HOURS OF SCRUBBER OUTAGE
                          TIME.

 6/77  SYSTEM       65.6       64.5        64.8        63.1                  720   705    455

       #* PROBLEMS/SOLLTIONS/COMMENTS

                          HIGH TRAY DIFFERENTIAL PRESSURE READINGS RESULTED IN 192 HOURS OF SCRUBBER
                          OUTAGE  TIME TO MAKE CORRECTIONS.

                          A  VENTURI RECYCLE LINE THROTTLE VALVE MALFUNCTIONED DURING JANUARY FORCING
                          THE SCRUBBER OUT OF SERVICE 56 HOURS.

                          THE SCRUBBER WAS OUT OF SERVICE 18 HOURS BECAUSE OF BOILER-RELATED
                          PROBLEMS.

 7/77  SYSTEM       72.9       72.9        72.9        72.9                  744   744    542

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          PROBLEMS RELATED TO HIGH DIFFERENTIAL TRAY PRESSURE ACCOUNTED  FOR  160
                          HOURS OF THE JULY SCRUBBER OUTAGE TIME.

                          REPAIRS TO A VENTURI DISCHARGE VALVE CONTRIBUTED 19 HOURS TO  FGD SYSTEM
                          OUTAGE  TIME.
                                             13-769

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWERS REID GARDNER 3 (CONT.)
-.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD    CAP.
                                                                502   PART.  HOURS HOURS   HOURS FACTOR

                          SCRUBBER FAN VIBRATION PROBLEMS CAUSED 23  HOURS OF  SCRUBBER OUTAGE  TIME.

  8/77  SYSTEM      69.7        59.7        62.5        50.4                   744    629     375

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          PROBLEMS RELATED TO HIGH DIFFERENTIAL PRESSURE READINGS  AT THE SCRUBBER
                          TRAY SECTION CONTINUED INTO EARLY AUGUST AND  ACCOUNTED FOR 59  HOURS OF
                          SCRUBBER OUTAGE TIME.

                          THE SCRUBBING  SYSTEM WAS FORCED OUT OF SERVICE 147  HOURS IN AUGUST  TO
                          MAKE REPAIRS MADE NECESSARY BY A VENTURI RECYCLE  LINE LEAK.

                          A  SCRUBBER OUTLET HIGH TEMPERATURE FALSE ALARM CAUSED A  19 HOUR SYSTEM
                          SHUTDOWN.

                          THE BOILER WAS OUT OF SERVICE FOR 144 HOURS DURING  AUGUST.

  9/77  SYSTEM      89.7        89.7        98.8        89.7                   720    720     646

        «* PROBLEMS/SOLUTIONS/COMMENTS

                          HIGH SOLIDS  IN THE VENTURI RECYCLE SYSTEM  CAUSED  EIGHT HOURS OF SCRUBBER
                          OUTAGE TIME  IN SEPTEMBER.

                          NEW  EFFLUENT AND POST NEUTRALIZATION  LINES WERE INSTALLED DURING SEPTEMBER
                          REQUIRING  66 HOURS OF SCHEDULED SCRUBBER OUTAGE TIME.

 10/77  SYSTEM      99.4        90.0        99.0        61.2                   744    506     455

        ** PROBLEMS/SOLUTIONS/COMMENTS

                           THE  SCRUBBER WAS DOWN 284 HOURS DURING OCTOBER BECAUSE OF A SCHEDULED
                          BOILER OUTAGE.

                           4.5  HOURS  OF OUTAGE TIME OCCURRED AS  A RESULT OF  HIGH VIBRATION PROBLEMS
                           ON A  SCRUE3ER  FAN.

 11/77  SYSTEM      88.8       88.0        88.6        86.7                   720    710     624

        ** PROBLEMS/SOLUTIONS/COMMENTS

                           THE  SCRUBBER WAS OUT OF SERVICE 80 HOURS FOR  THE  INSTALLATION  OF AN OUTLET
                           NOZZLE IN  THE  BOOSTER TANK.

                           THE  BOILER WAS OUT OF SERVICE APPROXIMATELY 15 HOURS IN  NOVEMBER.

 12/77  SYSTEM      84.8        90.1        93.1        83.8                   744    692     623

        ** PROBLEMS/SOLUTIONS/COMMENTS

                           A FAULTY SYSTEM  THERMOCOUPLE FORCED THE SCRUBBER  OUT OF  SERVICE 4 4
                           HOURS.

                           BOILER OUTAGE  TIME AMOUNTED TO  75 HOURS IN DECEMBER.

                           THE  INSTALLATION OF TRAY SPRAY  STRAINER REQUIRED  SOME SCRUBBER OUTAGE
                           TIME.

                           THE  FGD SYSTEM WAS OFF  LINE TO  INSTALL NEW SENSING  LINES.

  1/78  SYSTEM      99.5        99.5        99.5        99.5                   744    744     740
                                             13-770

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                          A PLUGGED VENTURI NOZZLE RESULTED IN FOUR HOURS OF SCRUBBER OUTAGE TIME
                          DURING JANUARY.

 2/78  SYSTEM      95.5         95.0        95.1        87.5                  672   619    588

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          A 16  HOUR FGD SYSTEM OUTAGE DUE TO A HIGH VENTURI TEMPERATURE READING
                          (CAUSED BY FAULTY WIRING) OCCURRED DURING FEBRUARY.

                          A MINOR 13 HOUR OUTAGE WAS NECESSARY TO CHECK THE VENTURI TEMPERATURE
                          INDICATOR.

                          THE FGD SYSTEM WAS  FORCED OUT OF SERVICE BY MIX TANK PLUGGING WHICH MADE
                          IT IMPOSSIBLE TO MIX CHEMICALS IN LATE FEBRUARY.

 3/78  SYSTEM      97.3         96.9        97.2        96.5                  7**   7*1    718

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE MIX TANK  PROBLEM WHICH BEGAN IN LATE FEBRUARY CONTINUED INTO MARCH
                          CAUSING THE ONLY FGD DOWNTIME FOR THE MONTH.  THE MIX TANK OUTAGE FOR
                          BOTH  MONTHS COMBINED TOTALLED 22 HOURS.

                          A FURNACE HIGH/LOW  PRESSURE TRIP CAUSED A BOILER OUTAGE OF SIX HOURS.

 */78  SYSTEM      97.1         89.3        96.8        87.3                  720   705    629

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE FGD SYSTEM WAS  DOWN  21 HOURS FOR REPAIRS ON THE VENTURI EMERGENCY
                          SPRAY SYSTEM.

                          THE BOILER WAS DOWN APPROXIMATELY 70 HOURS DURING APRIL FOR NON-SCRUBBER
                          RELATED PROBLEMS.

 5/78  SYSTEM      97.*         76.5        96.2        66.*                  7**   6*6    *9*

       ** PRCBLEMS/SOLUTIONS/COMMENTS

                          THERE WAS A SCHEDULED OUTAGE OF 230 HOURS FOR BOILER MAINTENANCE DURING
                          MAY.

                          A 20  HOUR SCRUBBER  FORCED OUTAGE RESULTED FROM A FAULTY TEMPERATURE PROBE
                          AT THE VENTURI DURING MAY.

 6/78  SYSTEM      95.9         95.6        95.9        95.2                  720   715    686

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          A HIGH/LOW FURNACE  PRESSURE TRIP RESULTED IN A FIVE HOUR BOILER OUTAGE.

                          A 29  HOUR FGD SYSTEM OUTAGE OCCURRED WHEN THE FIRE SPRAY SYSTEM WAS OUT  OF
                          SERVICE.

 7/78  SYSTEM      81.1         80.3        80.5        78.*                  7**   726    583
                                             13-771

-------
UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                SOS  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                          LOW VENTURI FLOW CAUSED A 16 HOUR FGD OUTAGE.  THIS WAS CORRECTED WHEN
                          THE RACE TRACK SPRAY COLLAR AND NOZZLES WERE CLEANED.

                          A SCHEDULED OUTAGE TO CLEAN THE BOILER TURBINE LUBE OIL COOLERS OCCURRED
                          DURING JULY TAKING THE SCRUBBER AND BOILER OUT OF SERVICE FOR 20 HOURS.

                          AN OUTAGE WAS REQUIRED FOR INSPECTION OF THE VENTURI TANK AND VENTURI RACE
                          TRACK COLLAR.  DURING THE OUTAGE THE TANK AND RACE TRACK NOZZLES WERE
                          CLEANED AND THE RUBBER LINING ON THE VENTURI SPOOL WAS REPLACED.

                          A 36 HOUR SCRUBBER OUTAGE WAS REQUIRED TO CLEAN THE VENTURI RACE TRACK
                          SFRAY COLLAR.

  8/78  SYSTEM       98.2        97.1        98.2        97.1                  744   744    722

       #* PROBLEMS/SOLUTIONS/COMMENTS

                          ONE EIGHT HOUR FORCED BOILER OUTAGE OCCURRED DUE TO HIGH FURNACE PRESSURE
                          READING.

                          THE SCRUBBER WAS FORCED OFF LINE ON AUGUST 28 DUE TO HIGH SCRUBBER FAN
                          OUTLET PRESSURE FOR APPROXIMATELY NINE HOURS.  THE SCRUBBER PRESSURE
                          SENSING LINE WAS CLEANED.

                          ON AUGUST 29 THE SCRUBBER EFFLUENT SOLIDS LEVEL WAS HIGH CAUSING AN OUTAGE
                          OF APPROXIMATELY FIVE HOURS.  THE SYSTEM WAS FLUSHED TO CORRECT THE
                          PROBLEM.

  9/78  SYSTEM      100.0        96.4       100.0        31.6                  720   236    228

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE UNIT WAS TAKEN OUT OF SERVICE ON SEPTEMBER 10 FOR A TURBINE OVERHAUL
                          WHICH  LASTED THROUGH THE END OF THE MONTH.

 10/78  SYSTEM      100.0                                   .0                  744     0      0

       *» PROBLEMS/SOLUTIONS/COMMENTS

                          THE UNIT WAS DOWN THE ENTIRE MONTH OF OCTOBER AS THE TURBINE OVERHAUL
                          CONTINUED.

 11/78  SYSTEM       98.4        92.6        97.6        66.3                  720   515    477

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE UNIT WAS BROUGHT BACK ON LINE NOVEMBER 10 AFTER COMPLETION OF THE
                          SCHEDULED TURBINE OVERHAUL.

                          THE FGD SYSTEM WAS OUT OF SERVICE FOR ABOUT 12 HOURS FOR REPAIRING VENTURI
                          TEMPERATURE PROBES.

 12/78  SYSTEM      100.0       100.0       100.0       100.0                  744   744    744

       ** PROBLEMS/SOLUTIONS/CCMMENTS

                          THE UTILITY REPORTED THAT NO FGD SYSTEM OUTAGES OCCURRED DURING DECEMBER.

  1/79  SYSTEM       66.4        67.2        67.2        66.4                  744   735    494   67>2
                                             13-772

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  '/. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                          95 HOURS OF SCRUBBER OUTAGE TIME WAS NECESSARY TO REPAIR A HOLE IN THE
                          VENTURI BOX.

                          TWO FORCED OUTAGES OCCURRED BECAUSE OF A HIGH EFFLUENT SOLIDS LEVEL.  THE
                          RECYCLE SYSTEM WAS CLEANED.  PROBLEMS WITH HIGH EFFLUENT SOLIDS ACCOUNTED
                          FOR 154 HOURS OF OUTAGE TIME.

 2/79  SYSTEM      48.7        45.7        46.7        44.9                  672   661    302  57.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          A STEAM LEAK IN THE SCRUBBER REHEATER COIL RESULTED IN A 54 HOUR SCRUBBER
                          OUTAGE.

                          THE FGD SYSTEM WAS OFF FOR A FEW HOURS TO REPAIR A LEAK IN THE VENTURI
                          LINE.

                          THE SCRUBBER WAS OUT OF SERVICE 139 HOURS TO REPAIR LEAKS IN EFFLUENT AND
                          VENTURI LINES.

                          THE SCRUBBER WAS OFF WITH THE BOILER BECAUSE OF A HIGH FURNACE PRESSURE
                          BOILER TRIP.

                          THE VENTUPI RACE TRACK NOZZLES WERE CLEANED DURING THE 25 HOUR FEBRUARY
                          BOILER OUTAGE.

                          REPAIRS RESULTING FROM A REHEATER FAN BURN UP ACCOUNTED FOR 151 HOURS OF
                          THE FEBRUARY SCRUBBER OUTAGE TIME.

 3/79  SYSTEM      100.0        97.9       100.0        32.3                  744   246    241  63.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE BOILER AND FGD SYSTEM WERE OFF-LINE FOR 39 HOURS SO THAT A BOILER ID
                          FAN COULD BE REPAIRED AND BALANCED.

                          THE BOILER AND FGD SYSTEM WERE OFF-LINE 465 HOURS FOR SCHEDULED MAIN-
                          TENANCE.

 4/79  SYSTEM      100.0       100.0       100.0       100.0                  720   720    720  74.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE UTILITY REPORTED THAT NO SCRUBBER OUTAGES OCCURRED DURING APRIL.

 5/79  SYSTEM      98.8        97.7        97.7        97.5                  744   742    725  79.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE SCRUBBER WAS INADVERTENTLY REMOVED FROM SERVICE.   SINCE THE SCRUBBER
                          WAS NOT OPERATING THE UTILITY TOOK THE OPPORTUNITY TO CLEAN THE SCRUBBER
                          PRESSURE SENSING LINES.  THE SYSTEM WAS OUT OF SERVICE FOR ABOUT 10 HOURS.

                          THE SCRUBBER PRESSURE SENSING LINES WERE CLEANED AGAIN AFTER A BOILER TRIP
                          ON HIGH FURNACE PRESSURE.  THIS OUTAGE LASTED ABOUT NINE HOURS.

 6/79  SYSTEM      94.2        91.3        93.5        83.5                  720   659    602  81.9
                                             13-773

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 3 (CONT.)
__	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  Y. REMOVAL    PER  BOILER   FGD    CAP.
                                                                S02   PART. HOURS HOURS   HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         77 HOURS OF BOILER OUTAGE TIME WAS REQUIRED  DURING  JUNE TO  REPAIR  A  BOILER
                         TUBE LEAK.

                         THE SCRUBBER WAS OUT OF SERVICE WHILE REPAIRS WERE  MADE ON  THE  FIRE  WATER
                         EMERGENCY SPRAY SYSTEM.

  7/79  SYSTEM       93.2        93.2        93.2        93.2                   744   744    694  83.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE 3A VENTURI RECYCLE PUMP HAD A BAD PUMP CASING LEAK CAUSING  ABOUT 50
                         HOURS OF OFF TIME.

                         THE 3B VENTURI PUMP WAS OUT OF SERVICE FOR MAINTENANCE.

  8/79  SYSTEM       87.6        93.0        92.6        87.6                   744   701    652  84.5

       ** PR03LEMS/SOLUTIONS/COMMENTS

                         THE SCRUBBER AND BOILER WERE BOTH SHUT DOWN  52 HOURS.  THE  EXPANSION JOINTS
                         ON THE BOILER CIRCULATING WATER PUMPS WERE REPLACED.

                         THE SCRUBBER WAS OFF TO CLEAN TRAY AND VENTURI RACE TRACK NOZZLES.   THE
                         SCRUBBER WAS DOUN FOR ABOUT 31 HOURS.

                         THE SCRUBBER WAS OFF TO REPAIR BROKEN FIRE LINES.   THE SCRUBBER WAS  LEFT
                         WITHOUT AN  EMERGENCY SPRAY SYSTEM.

  9/79  SYSTEM      100.0        98.8       100.0        90.2                   720   658    650  86.1

       ** PROBLEMS/SOLUTIONS/COMMENTS-

                         DURING SEPTEMBER THE SCRUBBER WENT OFF LINE  WITH THE BOILER TO  REPAIR
                         BOILER TUBE LEAKS.

 10/79  SYSTEM       97.2        97.2        97.2        97.2                   744   744    723  87.4

       »*  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING OCTOBER THE SCRUBBER WENT OFF  LINE BECAUSE THERE WAS NO  EMERGENCY
                         SPRAY TO THE SCRUBBER.  THE 2A  LOAD CENTER WAS OUT  FOR MAINTENANCE AND
                         THERE WAS NO POWER TO OPERATE THE FIRE PUMP.

 11/79  SYSTEM      100.0        98.7       100.0        80.4                   720   587    579  88.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         TWO OUTAGES OCCURRED DURING NOVEMBER  DUE TO  HIGH FURNACE  PRESSURE  CAUSING
                         A BOILER TRIP.  THE BOILER TRIP OUTAGES TOTALLED 32 HOURS.

                         THE SCRUBBER AND BOILER WERE TAKEN OFF LINE  ON NOVEMBER  25  FOR  SCHEDULED
                         MAINTENANCE.

 12/79  SYSTEM       86.6        72.4        74.8        39.7                   744   408     295  87.1

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF FOR THE  FIRST  TWO WEEKS OF  DECEMBER FOR  SCHEDULED
                         MAINTENANCE.
                          TWO SCRUBBER OUTAGES OCCURRED LATER IN THE MONTH DUE TO THE REHEATER BLOWER
                                             13-774

-------
                                                  UTILITY FGD SUPVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         MOTOR BURN OUTS.  THESE OUTAGES TOTALLED 100 HOURS.

 1/80  SYSTEM     100.0        99.8       100.0        91. *                  7*4   681    680  99.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY THE SCRUBBER AND BOILER MERE OFF LINE FOR APPROXIMATELY
                         6* HOURS SO THAT THE BOILER ID FAN COULD BE REPAIRED AND BALANCED.

 2/80  SYSTEM     100.0        98.1       100.0        77.9                  696   552    5*2  99.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY THE BOILER AND SCRUBBER MERE OFF LINE ONCE AT THE BEGINNING
                         AND ONCE AT THE EH3 OF THE MONTH TO BALANCE THE BOILER ID FAN.  BOILER ID
                         FAN BALANCING ACCOUNTED FOR 121 HOURS OF THE SCRUBBER OUTAGE TIME.

                         THE SCRUBBER AND BOILER WERE TAKEN OFF LINE SO THAT COAL LEAKS ON THE
                         BURNER LINES COULD BE REPAIRED.

                         HIGH FURNACE PRESSURE TRIPPED THE BOILER OFF LINE.  THIS CAUSED THE
                         SCRUBBER TO BE OFF LINE FOR SEVEN HOURS.

 3/80  SYSTEM     100.0        99.6       100.0      '  60.3                  7**   *50    4*8  99.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER AND SCRUBBER WERE TAKEN OFF-LINE TWICE DURING MARCH.  THE FIRST
                         OUTAGE WAS TO BALANCE THE BOILER ID FAN.  LATER IN THE MONTH THE ID FANS
                         AND THE ESPS HAD TO BE REPAIRED.  THE BOILER OUTAGES KEPT THE SCRUBBER
                         OFF-LINE 296 HOURS IN MARCH.

 */80  SYSTEM     100.0                                   .0                  720     0      0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS AVAILABLE 100X DURING APRILt HOWEVER, DID NOT OPERATE
                         DUE TO THE OVERHAUL OF BOTH THE DUST COLLECTOR AND THE ID FAN.

 5/80  SYSTEM         .0           .0           .0           .0                  7**   *62      0  77.8

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS DOWN THE ENTIRE MONTH FOR THE OVERHAUL OF THE FGD ID
                         FANS.  BECAUSE OF THIS, THE SYSTEM AVAILABILITY WAS ZERO FOR MAY.

 6/80  SYSTEM       75.2        81.*        81.*        72.2                  720   639    520  78.9

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE ID FAN OVERHAUL WAS COMPLETED EARLY IN  JUNE.

                         THE BOILER WAS OUT OF SERVICE FOR 21 HOURS.

 7/80  SYSTEM       95.7        96.*        95.7        95.2                  7**   735    721  82.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER RELATED OUTAGES KEPT THE  FGD SYSTEM  OFF  LINE FOR SEVERAL HOURS.

                         A HIGH VENTURI OUTLET TEMPERATURE FORCED THE FGD SYSTEM OFF  LINE DURING
                         PART OF JULY.

                         A HIGH VENTURI OUTLET TEMPERATURE FORCED THE FGD SYSTEM OFF  LINE DURING
                                             13-775

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 3 (CONT. )
-__,.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER  BOILER   FGD    CAP.
                                                                S02  PART. HOURS HOURS   HOURS FACTOR



 8/80  SYSTEM     100.0       100.0       100.0       100.0                   744    744     744  85.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS AVAILABLE DURING ALL OF AUGUST.

 9/80  SYSTEM       96.8        96.8        96.8        96.8                   720    720     697  87.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS OUT OF SERVICE IN SEPTEMBER BECAUSE OF  ROUTINE CLEANING
                         AND MAINTENANCE.

 10/80  SYSTEM       85.0        64.0        84.4        80.7                   744    715     600

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS TAKEN OFF-LINE DURING THE BEGINNING OF  OCTOBER DUE TO
                         A SCHEDULED UNIT OUTAGE.

                         DURING THE MONTH TWO OUTAGES AMOUNTING TO 111 HOURS OF OUTAGE TIME WERE
                         CAUSED BY PROBLEMS WITH THE REHEATER FAN MOTOR.

 11/80  SYSTEM       94.8       100.0        94.8        94.8                   720    682     682

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING NOVEMBER A SHEARED PIN ON THE AIR PREHEATER  COUPLING FORCED THE
                         SYSTEM OUT OF SERVICE FOR APPROXIMATELY SEVEN HOURS.

                         PROBLEMS WITH A TUBE LEAK FORCED THE SYSTEM DOWN SO THAT NECESSARY REPAIRS
                         COULD BE PERFORMED.

 12/80  SYSTEM      100.0        95.7        99.5        71.4                   744    531     531

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING DECEMBER THE SYSTEM WAS  SHUTDOWN FOR A SCHEDULED OUTAGE  WHICH
                         LASTED APPROXIMATELY 210 HOURS.

  1/81  SYSTEM       98.9        98.9        98.9        98.9                   744    744     735

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY THE SYSTEM WAS SHUT DOWN APPROXIMATELY EIGHT HOURS TO RE-
                         PAIR THE OUTLET DRAIN LINE AND  TO UNPLUG THE VENTURI NOZZLES.

  2/81  SYSTEM      100.0       100.0        100.0       100.0                   672    672     672

       *»  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY THE UTILITY REPORTED THAT NO MAJOR  FGD-RELATED  PROBLEMS
                         WERE ENCOUNTERED.

  3/81  SYSTEM       88.6        67.2        67.2        30.0                   744    332     223

       #*  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH  THE  BOILER  WAS OUT OF SERVICE  APPROXIMATELY  403 HOURS DUE TO
                         MAINTENANCE.

                         APPROXIMATELY 85  HOURS OF OUTAGE  TIME  WAS DUE TO THE CLEANING  OF THE
                         VENTURI  NOZZLES AND THE  TRAY SPRAY.
                                             13-776

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 4/81  SYSTEM     100.0        99.7        99.7        94.2                  720   680    678

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL THE BOILER WAS OUT OF SERVICE APPROXIMATELY 28 HOURS TO REMOVE
                         BUILD UP ON PENDENTS.

 5/81  SYSTEM      97.7        97.5        97.8        96.4                  744   735    717

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MAY THE SYSTEM WAS OFF-LINE FOR APPROXIMATELY SEVEN HOURS TO REPAIR
                         A LEAK IN THE VENTURI LINE.

                         THE VENTURI PUMP NEEDED REPAIR DURING THE MONTH CAUSING ADDITIONAL DOWN
                         TIME.

                         PROBLEMS WERE ENCOUNTERED WITH A TEMPERATURE PROBE.

 6/81  SYSTEM     100.0       100.0       100.0       100.0                  720   720    720

       **' PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO PROBLEMS WERE ENCOUNTERED DURING JUNE.

 7/81  SYSTEM      96.8        96.3        96.7        93.0                  744   719    692

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         24 HOURS OF OUTAGE TIME WERE REQUIRED TO CLEAN THE VENTURI THROAT SPRAY
                         HEADER (RACE TRACK).  THE RACE TRACK WAS CLEANED TWICE DURING THE MONTH.

                         THE STACK WAS INSPECTED DURING JULY.

 8/81  SYSTEM      97.9        97.9        97.9        97.9                  744   744    728

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SYSTEM WAS OUT OF SERVICE FOR 16 HOURS DURING AUGUST TO CLEAN THE
                         ABSORBER TRAY.

 9/81             100.0        98.2       100.0        75.0
       SYSTEM                                                                720   550

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THERE WERE NO FGD-RELATED OUTAGES DURING THE MONTH OF SEPTEMBER.

 10/81  SYSTEM      99.5        99.3        99.4        93.8                  744   702    698

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING OCTOBER PROBLEMS WERE ENCOUNTERED WITH THE VENTURI EXPANSION JOINT.
                         THIS ACCOUNTED FOR 4 HOURS OF DOWN TIME.

 11/81  SYSTEM      97.8        97.8        97.8        97.8                  720   720    703

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING NOVEMBER HIGH TEMPERATURE IN THE VENTURI TRIPPED THE SYSTEM.

                         THE ABSORBER WAS FORCED OFF-LINE DUE TO BUILD-UP.  APPROXIMATELY 11 HOURS
                         OF DOWN TIME WAS NEEDED FOR CLEANING.
                                             13-777

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 3 (CONT.)
._.	,__	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER   FGD    CAP.
                                                                SOS  PART. HOURS HOURS  HOURS  FACTOR


12/81  SYSTEM      99.4        97.8        96.6        48.8                  744    371     363

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         ON DECEMBER 6 THE UNIT WAS TAKEN OUT OF SERVICE FOR A SCHEDULED  OVERHAUL.
                         THE UNIT RETURNED TO SERVICE ON DECEMBER 22.

                         ON DECEMBER 28 THE FGD SYSTEM WAS SHUT DOWN TO REPAIR A VENTURI  PUMP.  THE
                         OUTAGE LASTED APPROXIMATELY FIVE HOURS.

  1/82  SYSTEM      98.2        96.3        98.4        86.0                  744    664     640

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS OUT OF SERVICE FOR APPROXIMATELY 13 HOURS TO  CLEAN AN
                         ABSORBER TRAY.

  2/82  SYSTEM      98.6        97.5        98.5        87.1                  672    600     585

       ** PROBLEMS/SOLUTIONS/COMMEHTS

                         DURING FEBRUARY APPROXIMATELY TWO HOURS OF SYSTEM DOWN TIME WAS  DUE TO A
                         LEAK  IN THE ID FAN LUBE OIL SYSTEM.

                         HIGH  TEMPERATURES IN THE VENTURI OUTLET FORCED THE SYSTEM  OFF-LINE FOR
                         ABOUT EIGHT HOURS.

                         THE BOILER WAS TAKEN OFF-LINE ON FEBRUARY 27 FOR A SCHEDULED OVERHAUL.

  3/82  SYSTEM      100.0        90.6        90.6        30.9                  744    254     230

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCHEDULED BOILER OVERHAUL CONTINUE UNTIL MARCH 18.

                         DURING MARCH NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED.

  4/82  SYSTEM      91.1        91.0        91.0        90.9                  720    719     655

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL THE SYSTEM WAS TAKEN OFF-LINE THREE TIMES DUE TO A  FAULTY
                         TEMPERATURE PROBE.

                         THE SYSTEM WAS FORCED OFF-LINE ONCE DUE TO A FAN HIGH VIBRATION.

  5/82  SYSTEM      85.5        94.3        88.6        88.6                  744    699     659

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SYSTEM WAS TAKEN OFF-LINE TWICE DURING MAY DUE TO HIGH ID FAN VIBRA-
                         TION.

  6/82  SYSTEM      100.0        97.5        97.6        95.6                  720    706     688

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JUNE THE FGD SYSTEM WAS OFF-LINE PART OF THE TIME TO CONNECT THE
                         SEAL  WATER  LINES TO THE PUMPS.

  7/82  SYSTEM      95.0        96.6        94.6        86.9                  744    669     646
                                             13-778

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER TUBE LEAKS ACCOUNTED FOR APPROXIMATELY 61 HOURS OF DOWN TIME FOR THE
                         FGD SYSTEM DURING JULY.

                         CONTROL PROBLEMS WITH AN ID FAN RESULTED IN 4 HOURS OF OUTAGE TIME DURING
                         THE MONTH.

                         A CLEANING OF THE ABSORBER SPRAY NOZZLE RACE TRACK ACCOUNTED FOR 10 HOURS
                         OF DOWN TIME FOR THE SYSTEM.

                         REPAIRS ON THE ABSORBER TRAY TOWER SPRAY LINE RESULTED IN AN FGD SYSTEM
                         OUTAGE DURING JULY.

                         A 20 HOUR OUTAGE RESULTED FROM A CLEANING OF THE ABSORBER TRAYS.

 8/82  SYSTEM     100.0       100.0       100.0       100.0                  744   744    7*4

       «» PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING AUGUST.

 9/82  SYSTEM      94.9        97.8        94.9        94.9                  720   699    683

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         A CLEANING OF THE ABSORBER TRAYS ACCOUNTED FOR APPROXIMATELY 22 HOURS OF
                         DOWN TIME DURING SEPTEMBER.

                         THE REPLACEMENT OF EFFLUENT SYSTEM VALVES ACCOUNTED FOR A 2 HOUR OUTAGE
                         DURING THE MONTH.

                         EFFLUENT LINE REPAIRS RESULTED IN APPROXIMATELY 13 HOURS OF DOWN TIME
                         DURING THE MONTH.

10/82  SYSTEM     100.0        93.3       100.0        45.8                  744   347    341

       ** PROBLEMS/SOLUTIONS/COMKENTS

                         ELECTRICAL PROBLEMS ACCOUNTED FOR APPROXIMATELY 30 HOURS OF DOWN TIME
                         DURING THE MONTH.

                         THE UNIT WAS OUT OF SERVICE APPROXIMATELY 15 DAYS DURING OCTOBER FOR A
                         SCHEDULED OVERHAUL.

11/82  SYSTEM      96.2        63.9        75.8        12.0                  720   135     86

       ** PROBLEMS/SOLUTIOHS/COMMENTS

                         THE UNIT WAS OUT OF SERVICE FOR 66 HOURS DURING NOVEMBER FOR A SCHEDULED
                         OVERHAUL.

                         BOILER TUBE LEAKS ACCOUNTED FOR APPROXIMATELY 23 DAYS OF OUTAGE TIME DURING
                         NOVEMBER.

                         PROBLEMS WITH AN ID FAN CONTROL DAMPER RESULTED IN APPROXIMATELY 28 HOURS
                         OF DOWN TIME FOR THE FGD SYSTEM.

12/82  SYSTEM      97.5        70.6        94.9        46.6                  744   491    347
                                             13-779

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 3 (CONT. )
	„	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD    CAP.
                                                                SOS  PART. HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         APPROXIMATELY 16 DAYS OF OUTAGE TIME DURING DECEMBER RESULTED FROM BOILER
                         TUBE  LEAKS.

                         PROBLEMS WITH ID FAN CONTROLS WERE EXPERIENCED DURING DECEMBER.

  1/83  SYSTEM      100.0        98. Z       100.0        41.8                  744    317     311

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         ALL OUTAGE TIME DURING JANUARY WAS DUE TO BOILER TUBE LEAKS.

  2/83  SYSTEM       98.1        98.3        98.1        96.5                  672    660     649

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         APPROXIMATELY 13 HOURS OF DOWN TIME WAS REQUIRED FOR THE BALANCING OF AN
                         ID FAN.

                         BOILER-RELATED PROBLEMS ACCOUNTED FOR APPROXIMATELY 11 HOURS OF  OUTAGE TIME
                         DURING FEBRUARY.

  3/83  SYSTEM      100.0        98.2       100.0        85.5                  744    648     636

       ** PROSLEMS/SOLUTIONS/COMMENTS

                         BOILER-RELATED PROBLEMS ACCOUNTED FOR APPROXIMATELY 12 HOURS OF  DOWN  TIME
                         DURING MARCH.

                         THE UNIT WAS OUT OF SERVICE 4 DAYS DURING MARCH FOR A SCHEDULED  OVERHAUL.

  4/83  SYSTEM       91.8        86.8        88.0        59.8                  720    496     430

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OUT OF SERVICE FOR APPROXIMATELY 202 HOURS DURING THE MONTH
                         FOR A SCHEDULED OVERHAUL.

                         THE UNIT WAS DOWN FOR 29 HOURS IN APRIL TO CHECK FOR I.D.  FAN VIBRATIONS.

                         MAINTENANCE ON THE SCRUBBER EFFLUENT SYSTEM ACCOUNTED FOR  34 HOURS OF
                         OUTAGE TIME IN APRIL.

                         A HIGH SOLIDS CONCENTRATION IN THE SCRUBBER FORCED THE UNIT OUT  OF SERVICE
                         FOR APPROXIMATELY 25 HOURS DURING THE MONTH.

  5/83   SYSTEM       98.5        97.3        98.4        96.9                  744    741     721

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER-RELATED PROBLEMS ACCOUNTED FOR APPROXIMATELY 12 HOURS OF  OUTAGE
                         TIME  DURING THE MONTH.

                         A FAULTY VENTURI TEMPERATURE  PROBE ACCOUNTED FOR APPROXIMATELY  12 HOURS  OF
                         OUTAGE TIME  IN MAY.

  6/33   SYSTEM       95.8        94.1        94.3        69.6                  720    533     501
                                             13-780

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A FAULTY TEMPERATURE PROBE ACCOUNTED FOR APPROXIMATELY 16 HOURS OF OUTAGE
                         TIME IN JUNE.

                         A FAULTY DAMPER FORCED THE UNIT OUT OF SERVICE IN JUNE FOR 30 HOURS.

                         HIGH FURNACE PRESSURE RESULTED IN 11 HOURS OF UNIT DOWN TIME
                         DURING THE MONTH.

                         THE UNIT WAS OUT OF SERVICE APPROXIMATELY 163 HOURS DURING JUNE DUE TO A
                         LACK OF POWER DEMAND.

 7/83  SYSTEM      96.0        96.7        95.6        87.0                  744   670    647

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         APPROXIMATELY 64 HOURS OF OUTAGE TIME DURING JULY WAS DUE TO A LACK OF
                         POWER DEMAND.

                         A LOSS OF VENTURI FLOW ACCOUNTED FOR APPROXIMATELY 18 HOURS OF DOWN TIME
                         DURING THE "MONTH.

                         A 12 HOUR OUTAGE DURING THE MONTH WAS REQUIRED TO CLEAN A VENTURI TANK.

                         A 3 HOUR OUTAGE OCCURRED DURING JULY DUE TO A BOILER PROBLEM.

 8/83  SYSTEM     100.0        99.6       100.0        84.4                  744   631    628

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER-RELATED OUTAGES ACCOUNTED FOR APPROXIMATELY 53 HOURS OF DOWN
                         TIME DURING AUGUST.

                         THE UNIT WAS DOWN APPROXIMATELY 64 HOURS DURING AUGUST DUE TO A LACK OF
                         POWER DEMAND.

 9/83  SYSTEM     100.0       100.0       100.0        62.0                  720   447    447

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER TUBE LEAKS ACCOUNTED FOR APPROXIMATELY 175 HOURS OF DOWN TIME DURING
                         SEPTEMBER.

                         THE UNIT WAS DOWN APPROXIMATELY 79 HOURS DURING SEPTEMBER BECAUSE OF LOW
                         POWER DEMAND.

 10/83  SYSTEM     100.0       100.0       100.0       100.0                  744   744    744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED OUTAGES WERE ENCOUNTERED DURING OCTOBER 1983.

 11/83  SYSTEM     100.0       100.0       100.0        82.7                  720   595    595

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER RELATED PROBLEMS ACCOUNTED FOR APPROXIMATELY 52 HOURS OF DOWN TIME
                         DURING NOVEMBER.

                         THE UTILITY REPORTED A SCHEDULED OUTAGE BEGINNING ON NOVEMBER  27 AND CON-
                         TINUING THROUGH THE END OF THE MONTH.

 12/83  SYSTEM     100.0       100.0       100.0        66.0                  744   491    491
                                             13-781

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODUUE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD    CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN APPROXIMATELY 228 HOURS DURING THE MONTH FOR A SCHEDULED
                         OUTAGE.

                         BOILER RELATED PROBLEMS ACCOUNTED FOR APPROXIMATELY 3 HOURS OF OUTAGE  TIME
                         DURING THE MONTH.

                         THE UNIT WAS DOWN APPROXIMATELY 22 HOURS DURING DECEMBER DUE TO  LOW DEMAND.

  1/84  SYSTEM     100.0        99.7       100.0        99.7                  744   744    742

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DUE TO A BOILER OUTAGE, THE FGD SYSTEM WAD DOWN 2.3 HOURS DURING JANUARY.

  2/84  SYSTEM     100.0       100.0       100.0       100.0                  696   696    696

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED DURING FEBRUARY.

  3/84  SYSTEM     100.0       100.0       100.0        98.3                  744   731    731

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN APPROXIMATELY 13 HOURS DURING MARCH DUE TO A LACK OF
                         POWER DEMAND.

  4/84  SYSTEM     100.0        99.8       100.0        90.2                  720   651    650

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN APPROXIMATELY 70 HOURS IN APRIL DUE TO BOILER
                         OUTAGES.

  5/84  SYSTEM     100.0       100.0       100.0        70.1                  744   521    521

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF LINE APPROXIMATELY 223 HOURS IN MAY DUE TO A
                         SCHEDULED BOILER OUTAGE.

  6/84  SYSTEM     100.0       100.0       100.0       100.0                  720   720    720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED DURING JUNE.

  7/84  SYSTEM       96.1        96.0        96.0        95.6                  744   741    711

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE FGD SYSTEM WAS SHUT DOWN APPROXIMATELY
                         4 HOURS TO INSPECT AN ABSORBER TRAY.

                         DURING JULY, THE FGD SYSTEM WAS DOWN 5.5 HOURS TO CLEAN THE EFFLUENT
                         SYSTEM.

                         A 3.1 HOUR FGD SYSTEM OUTAGE OCCURRED IN JULY DUE TO FAN RELATED
                         PROBLEMS.
                          A  FORCED  OUTAGE  LASTING APPROXIMATELY  7 HOURS OCCURRED DURING  JULY  DUE  TO
                                             13-782

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEVADA POKER: REID GARDNER 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         VENTURI SCRUBBER RELATED PROBLEMS.

                         THE FGD SYSTEM WAS OFF LINE 3.7 HOURS DURING JULY TO REPLACE THE
                         3B VENTURI MOTOR.

                         ABSORBER TRAY AND VENTURI SPRAY NOZZLE CLEANING RESULTED IN APPROXIMATELY
                         7 HOURS OF DOWN TIME DURING JULY.

                         THE UNIT WAS DOWN APPROXIMATELY 4 HOURS IN JULY DUE TO BOILER RELATED
                         PROBLEMS.

 8/8*  SYSTEM     100.0        99.6       100.0        97.2                  74*   726    724

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         UNIT 3 WAS DOWN FOR 21 HOURS IN AUGUST DUE TO BOILER RELATED PROBLEMS.
                         PROBLEMS.

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR SEPTEMBER 1984.
                                             13-783

-------
UTILITY FGD SURVEY5 OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - V.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

 *** PARTICLE CONTROL

 ** FABRIC FILTER
     NUMBER
     SUPPLIER

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC  TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL

 *** FGD  SYSTEM
NEVADA POWER
REID GARDNER
4
MOAPA
NEVADA
B
******
******
******
  580
  295
  250
  495
  250
FOSTER WHEELER
PULVERIZED COAL
BASE
********
*******
  152.
CONCRETE
*******
I****** LB/MMBTU)
<****** LB/MMBTU)
(****** LB/MMBTU)
(******* ACFM)
(**** F)
(  500 FT)

(***** FT)
COAL
******
26749.

    8.00
******
********
******
      .75
0.5-1.0
********
******
CARBORUNDUM
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
(  11500 BTU/LB)
 ******
  ** GENERAL DATA
      SALEABLE  PRODUCT/THROWAWAY  PRODUCT
      S02 REMOVAL MODE
      PROCESS TYPE
      SYSTEM SUPPLIER
      A-E FIPM
      DEVELOPMENT LEVEL
      NEW/RETROFIT
      UNIT DESIGN S02 REMOVAL EFFICIENCY  -  7.
      CURRENT STATUS
      COMMERCIAL START-UP
      INITIAL START-UP
THROWAWAY PRODUCT
WET SCRUBBING
SODIUM CARBONATE
THYSSEN/CEA
FLUOR - PIONEER
FULL SCALE
MEW
   85.00
 1
 7/83
 6/83

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
NEVADA POWER: REID GARDNER 
-------
UTILITY FGD SURVEY: OCTOBER 1933 - SEPTEMBER 1984

NEVADA POWER: REID GARDNER 4 (CONT.)
 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE                                     NA

«** SLUDGE

 ** TREATMENT
     METHOD                                     NA
     DEVICE                                     NA
     PROPRIETARY PROCESS                        NA

 ** DISPOSAL
     NATURE                                     FINAL
     TYPE                                       POND
     LOCATION                                   ON-SITE
     SITE TREATMENT                             CLAY LINING

 «* WATER BALANCE
     WATER  LOOP TYPE                            OPEN
 	PERFORMANCE DATA	
 PERIOD MODULE  AVAILABILITY  OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD    CAP.
                                                                S02   PART. HOURS  HOURS  HOURS FACTOR


  6/83  SYSTEM                                                                 720

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE  FGD  SYSTEM COMMENCED OPERATION  IN JUNE AND  IS CURRENTLY  IN  THE STARTUP
                          PHASE  OF OPERATION.

  7/83  SYSTEM       95.8        14.3        73.3        11.6                   744    606    87

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE  UNIT WAS DOWN  APPROXIMATELY  626 HOURS DURING JULY DUE  TO BOILER-RELATED
                          PROBLEMS.

                          BYPASS DAMPER  PROBLEMS ACCOUNTED FOR 32 HOURS OF OUTAGE  TIME DURING  THE
                          MONTH.

  8/83  SYSTEM       50.2        56.9        48.5        46.8                   744    612    348

        ** FROBLEMS/SOLUTIONS/COMMENTS

                          THE  FGD  SYSTEM WAS DOWN APPROXIMATELY 15 DAYS DURING AUGUST  DUE TO BYPASS
                          DAMPER PROBLEMS.

                          APPROXIMATELY  25 HOURS OF OUTAGE TIME DURING THE MONTH RESULTED FROM BOIL-
                          ER PROBLEMS.

  9/83  SYSTEM      100.0        92.1      100.0        48.9                   720    382    352

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          BOILER RELATED PROBLEMS AND  SCHEDULED BOILER OVERHAUL ACCOUNTED FOR  APPROX-
                          IMATELY 368 HOURS  OF DOWN TIME DURING SEPTEMBER.

 10/83  SYSTEM       99.6        95.2        98.9        35.4                   744    277    264

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE  UNIT WAS  OUT OF SERVICE  APPROXIMATELY  20 DAYS  DURING OCTOBER FOR CON-
                          TINUATION OF  THE SCHEDULED OUTAGE.

                          ADDITIONAL BOILER  RELATED PROBLEMS  ACCOUNTED FOR 14 HOURS OF DOWN TIME
                                             13-786

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

NEVADA POWER: REID GARDNER 4 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         DURING THE MONTH.

                         FAN PROBLEMS ACCOUNTED FOR 3 HOURS OF FGD SYSTEM DOWN TIME DURING THE MONTH

11/83  SYSTEM     100.0        98.2       100.0        96.5                  720   707    695

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         APPROXIMATELY 26 HOURS OF OUTAGE TIME DURING NOVEMBER MAS DUE TO BOILER-
                         TRIPS.

12/83  SYSTEM      99.9        99.2        99.9        98.2                  744   737    731

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER RELATED PROBLEMS ACCOUNTED FOR APPROXIMATELY 12 HOURS OF DOWN TIME
                         DURING DECEMBER.

                         ELECTRICAL PROBLEMS ACCOUNTED FOR A BRIEF 1 HOUR OUTAGE OF THE ABSORBER
                         DURING DECEMBER.

  1/84  SYSTEM     100.0        99.1       100.0        97.9                  744   735    729

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS DOWN 2.3 HOURS DURING JANUARY DUE TO BOILER OUTAGES.

  2/84  SYSTEM      99.6        99.2        99.5        82.7                  696   581    576

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE FGD SYSTEM WAS DOWN APPROXIMATELY 3 HOURS
                         DUE TO THE HIGH INLET TEMPERATURES OF MODULE A'S ABSORBERS.

                         THE FGD SYSTEM WAS DOWN APPROXIMATELY 117 HOURS IN FEBRUARY DUE TO
                         BOILER PROBLEMS.

  3/84  SYSTEM     100.0        99.0        99.9        51.0                  744   383    380

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS SHUT DOWN FOR APPROXIMATELY 364 HOURS DURING MARCH DUE TO
                         BOILER OUTAGES.

                         THE FGD SYSTEM WAS DOWN 0.3 HOURS DURING MARCH DUE TO BYPASS DAMPER
                         PROBLEMS.

  4/84  SYSTEM      99.9        100.0        99.8        84.1                  720   606    606

       ** PROBLEMS/SOLUTIOHS/COMMENTS

                         THE FGD SYSTEM WAS DOWN 1 HOUR DURING APRIL DUE TO ELECTRICAL PROBLEMS.

  5/84  SYSTEM      99.9        53.9        99.7        47.0                  744   648    349

       #* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF LINE FOR 393.5 HOURS DURING MAY DUE TO BOILER-RELATED
                         PROBLEMS.

                         MODULES B AND C WERE FORCED OFF LINE ONE HOUR DURING MAY DUE TO LACK OF
                         SOOT  BLOWERS AND A RESULTING TRIP ON HIGH TEMPERATURES.

  6/84  SYSTEM      99.9        99.5        99.9        95.1                  720   688    685
                                             13-787

-------
UTILITY FED SURVEY: OCTOBER 1983 - SEPTEMBER 198
-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY M/FGD - MM
NET UNIT GENERATING CAPACITY MO/FGD - MM
EQUIVALENT SCRUBBED CAPACITY - MM

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOH - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RAN3E ASH CONTENT - V.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** ESP
     NUM3ER
     TYPE
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 «* PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL

»** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROMAMAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT. DESIGN S02 REMOVAL EFFICIENCY - 7.
 NEM YORK STATE  ELEC  »  GAS
 SOMERSET
 SOMERSET
 NEM YORK
 A
    13.
   301.
 ******
   850
   625
   625
   495
   625
               (   .030 LB/MMBTU)
               (   .700 LB/MMBTU)
               (****** LB/MMBTU)
 BABCOCK 4 HILCOX
 PULVERIZED COAL
 BASE
                (2862800 ACFM)
                (  313 F)
                (  450 FT)

                (  25.0 FT)
                (  12000 BTU/LB)
                 10500-12500
 1350.96
  156.1
  137.
CONCRETE
    7.6
COAL
BITUMINOUS
27912.

   12.00
10.0-22.0
    5.80
6.0-10.0
    2.70
2.0-3.0
     .15
0.07-0.15
 COLD SIDE
      .1
    99.7
  0
 NONE
 N/A
 N/A
 N/A
 N/A
 N/A
 N/A
 THROMAMAY PRODUCT
 WET SCRUBBING
 LIMESTONE
 PEABODY PROCESS SYSTEMS
 UNITED ENGINEERS t CONSTRUCTORS
 FULL SCALE
 NEM
7.   99.77
    90.00
               (   1. IN-H20)
                                            13-789

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NEW YORK STATE ELEC & GAS: SOMERSET 1 (CONT.)

     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
 1
 8/84
 7/84
 2/82
 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     LIQUID RECIRCULATION RATE - LITER/S
     L/G  RATIO -  L/CU.M
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C

 ** MIST  ELIMINATOR
     FRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     TEMPERATURE  INCREASE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 »* DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 »* DUCTWORK
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE
NA
NA
 6
 2
SPRAY TOWER
OPEN COUNTERCURRENT SPRAY
N/A
PEABODY PROCESS SYSTEMS
CARBON STEEL
AISI 1110
N/A
ORGANIC
GLASS FLAKE-FILLED POLYESTER  [ABSORBER BOTTOM
FLAKELINE 103; BLACK NATURAL  RUBBER
 2929.         (46500 GPM)
    8.7        ( 65.0 GAL/1000 ACF)
  337.74       ( 715700 ACFM)
  156.1        (  313 F)
NA
NA
NA
NA
NA
NA
 1
IN-LINE
STEAM
NA
   27.8        (   50 F)
NA
NA
 4
 0
NR
UNIT
NR
DRY
NR
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
                                             13-790

-------
NEW YORK STATE ELEC & GAS: SOMERSET 1 (CONT.)
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984
 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 ** TANKS
     SERVICE
     ABSORBER RECYCLE

 *» PUMPS
     SERVICE
     NA
 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE

«** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT

 ** WATER BALANCE
     WATER LOOP TYPE
     SOURCE OF MAKEUP WATER
WET BALL MILL
NR
NR
NUMBER

   6


NUMBER

«***


THICKENER


VACUUM FILTER
STABILIZATION
PUG MILL
N/A
FINAL
LANDFILL
ON-SITE
TRUCK
NONE
CLOSED
LAKE WATER t RECYCLE PLANT WASTE WATER
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY  OPERABILITY RELIABILITY UTILIZATION
                X REMOVAL   PER  BOILER  FGD   CAP.
                503  PART. HOURS HOURS  HOURS FACTOR
       SYSTEM

  8/84  SYSTEM

  9/84  SYSTEM
                             744

                             744

                             720
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY REPORTED THAT  INITIAL OPERATION OF THE FGD SYSTEM AT
                         SOMERSET  1 COMMENCED IN JULY 1984. COMMERCIAL START UP TOOK PLACE
                         IN EARLY  AUGUST. SINCE START UP, THE FGD SYSTEM HAS BEEN THROUGH
                         THE EARLY SHAKEDOWN/DEBUGGING PHASE OF OPERATION.
                                             13-791

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

  ** UNIT DATA  -  BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

  ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT  CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFL'R CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

 ***  PARTICLE CONTROL

  ** MECHANICAL COLLECTOR
     NUMBER
     TYPE
     SUPPLIER

  **  ESP
     NUMBER
     TYPE
     SUPPLIER
     INLET  FLUE  GAS CAPACITY - CU.M/S
     INLET  FLUE  GAS TEMPERATURE - C

  **  PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC  TYPE
     TRADE  NAME/COMMON NAME
     GAS CONTACTING DEVICE TYPE

 ***  FGD SYSTEM

  ** GENERAL DATA
     SALEABLE  PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
NIAGARA MOHAWK POWER
CHARLES R. HUNTLEY
66
BUFFALO
NEW YORK
E
   73.
  602.
******
*****
  100
   95
               (   .170 LB/MMBTU)
               (  1.400 LB/MMBTU)
               (****** LB/MMBTU)
  100
BABCOCK t WILCOX
PULVERIZED COAL
CYCLING
  188.76
  160.0
   61.
CARBON STEEL
    3.7
               t  400000 ACFM)
               (  320 F)
               (  200 FT)

               (  12.2 FT)
               ( 12500 BTU/LB)
                ******
COAL
******
29075.

    7.03
******
********
******
    1.80
******
      .70
******
16
CYCLONE
ATOMICS INTERNATIONAL
COLD SIDE
WESTERN PREC. DIVISION, JOY
  235.9        ( 500000 ACFM)
  154.4        (  310 F)
 0
NONE
N/A
N/A
N/A
SALEABLE PRODUCT
SPRAY DRYING
AQUEOUS CARBONATE/SPRAY DRYING
ROCKWELL INTERNATIONAL
UNITED ENGINEERS & CONSTRUCTORS
DEMONSTRATION
                                             13-792

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
NIAGARA MOHAWK POWER: CHARLES R. HUNTLEY 66 (CONT.)

     NEW/RETROFIT                               RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY - X   99.80
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X        87.50
     CURRENT STATUS                              1
     COMMERCIAL START-UP                         8/82
     INITIAL START-UP                            4/62
     CONTRACT AWARDED                            1/77

 ** DESIGN AND OPERATING PARAMETERS
     OPER. ft MAINT. REQUIREMENT - MANHR/DAY       840.0

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     NUMBER OF CONTACTING ZONES
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X
     PARTICLE REMOVAL EFFICENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 *« REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S                  202.92
     FLUE GAS TEMPERATURE - C                      76.7
     CONSTRUCTION MATERIAL GENERIC TYPE         NR

 *« DAMPERS
     FUNCTION                                   NR
     GENERIC TYPE                               NR
     SPECIFIC TYPE                              NR
     CONSTRUCTION MATERIAL GENERIC TYPE         NR
     CONSTRUCTICH MATERIAL SPECIFIC TYPE        NR
     LINER GENERIC MATERIAL TYPE                NR
     LINER SPECIFIC MATERIAL TYPE               NR
NR
NR
 1
 0
SPRAY DRYER
COUNTERCURRENT
ROTARY ATOMIZER
ROCKWELL INTERNATIONAL
42.0 DIA X 60.0
CARBON STEEL
ASTM A-36
NR
NONE
N/A
N/A
 3
     .0        (
     .7        (
  162.8        (
   85.3
   99.8
NONE
N/A
N/A
N/A
NR
NR
DIRECT COMBUSTION
NR
NR
NR
NR
 1
 0
NR
BUFFALO FORGE
NR
NR
DRY
  .2 GAL/1000 ACF)
3.0 IN-H20)
 325 F)
               ( 430000 ACFM)
               (  170 F)
                                            13-793

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NIAGARA MOHAWK POWER: CHARLES R. HUNTLEY 66 (CONT.)
 ** DUCTWORK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 ** PUMPS
     SERVICE
      NR
  ** SOLIDS CONCENTRATING/DEWATERING
      DEVICE

 **» SALEABLE BYPRODUCTS
      NATURE
      FULL LOAD QUANTITY -  M T/H
      QUALITY - X
      DISPOSITION

 »«* SLUDGE

  ** TREATMENT
      METHOD
      DEVICE
      PROPRIETARY PROCESS

  ** DISPOSAL
      NATURE
      TYPE

  *# PROCESS CONTROL AND INSTRUMENTATION
      PHYSICAL VARIABLES
      MONITOR LOCATION
      PROCESS CONTROL MANNER
      PROCESS CHEMISTRY MODE

  «* WATER BALANCE
      WATER LOOP TYPE
      EVAPORATION WATER LOSS - LITER/S
      MAKEUP WATER ADDITION - LITERS/S

  ** FGD SPARE CAPACITY INDICES
      ABSORBER - X

  *» FGD SPARE COMPONENT INDICES
      ABSORBER
CARBON STEEL
AISI 1110
NONE
N/A
MIX TANK
N/A
AGITATED TANK
NUMBER

****


CENTRIFUGE
ELEMENTAL SULFUR
     .54       (
   99.9
MARKETED
N/A
N/A
N/A
N/A
NONE
S02 & TEMP
STACK
AUTOMATIC
FEEDBACK
 .60 TPH)
OPEN
    7.2
    7.6
      .0
                                                      .0
114 GPM)
121 GPM)
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                                                 X REMOVAL
                                                                 S02  PART.
                             PER   BOILER   FGD    CAP.
                           HOURS  HOURS  HOURS FACTOR
  4/82  SYSTEM
                                                                              720
                                             13-794

-------
                                                  UTILITY FED SURVEY: OCTOBER 1983 - SEPTEMBER

NIAGARA MOHAWK POWER: CHARLES R. HUNTLEY 66 (CONT.)
------------------------------------------ PERFORMANCE DATA ------------------------------------------
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INITIAL FGD OPERATIONS BEGAN AT THIS FACILITY DURING APRIL 1982.

 5/82  SYSTEM                                                                744

 6/82  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGO SYSTEM COMMENCED OPERATION IN APRIL AND IS CURRENTLY IN THE STARTUP
                         PHASE OF OPERATION.  SOME MODIFICATIONS ARE BEING PERFORMED ON THE CLEANING
                         FACILITY AND THE UTILITY IS PREPARING TO START UP THE REGENERATIVE SYSTEM.

 7/82  SYSTEM                                                                7**

 8/82  SYSTEM                                                                7**

 9/82  SYSTEM                                                                720

10/82  SYSTEM                                                                74*

11/82  SYSTEM                                                                720

12/82  SYSTEM                                                                7**

 1/83  SYSTEM                                                                7**

 2/83  SYSTEM                                                                672

 3/83  SYSTEM                                                                720

 4/83  SYSTEM                                                                720

 5/83  SYSTEM                                                                7*4

 6/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE  FGD SYSTEM IS STILL IN THE STARTUP PHASE OF
                         OPERATION.  THE  LONGEST NON-INTEGRATED RUN ACHIEVED BY THE FGD SYSTEM WAS
                         FOR THREE WEEKS  DURING THE MONTH OF JUNE.  SINCE INITIAL STARTUP IN APRIL,
                         1982, THE DEMONSTRATION UNIT HAS ONLY ONCE MET COMPLIANCE BY OPERATING
                         24 CONTINUOUS HOURS AS A TOTAL INTEGRATED SYSTEM.  ONCE THE SYSTEM HAS
                         OBTAINED 330 DAYS  OF COMPLIANCE OPERATION, THE UTILITY PLANS TO DISMANTLE
                         THE SYSTEM AND AGAIN BURN LOW  SULFUR COAL AS A COMPLIANCE STRATEGY.

                         REPAIRS WERE MADE  TO THE ROTARY ATOMIZER MOTORS.  IMPROPER ATOMIZATION WAS
                         REPORTED AS THE  REASON FOR THE REPAIRS.

                         REPAIRS WERE ALSO  REQUIRED ON  THE REDUCER PNEUMATIC CONVEYOR SYSTEM BECAUSE
                         OF PLUGGING AND  DUSTING PROBLEMS.

                         THE UTILITY REPORTED THAT IT EXPERIENCED PROBLEMS WITH THE CARBONATION
                         TRAY WASH SYSTEM.
  7/83   SYSTEM

  8/83   SYSTEM                                                                 74*

  9/83   SYSTEM                                                                 720
                                             13-795

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NIAGARA MOHAWK POWER: CHARLES R. HUNTLEY 66 (CONT.)
.____..	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE DRY SCRUBBER AND THE SULFUR BYPRODUCT RE-
                         COVERY PORTIONS OF THE FGD SYSTEM ARE FOR THE MOST PART MEETING  COMPLIANCE
                         LEVELS.  MINOR PROBLEMS EXPERIENCED DURING THE THIRD QUARTER INCLUDED
                         NOZZLE EROSION AND PNEUMATIC PUMP SEALS LEAKING.

                         THE SILICON CARBIDE NOZZLE INSERTS LOCATED IN THE ROTARY ATOMIZER HAVE BEEN
                         ERODING (NOZZLE DIAMETER GRADUALLY ENLARGES).  THE SUPPLIER IS PRESENTLY
                         STUDYING THE PROBLEM.

                         REPAIRS WERE MADE TO THE PNEUMATIC SOLID FEED SYSTEM WHICH TRANSPORTS
                         SPENT SLURRY FROM A STORAGE SILO TO THE MOLTEN SALT REDUCER.  THE PNEUMATIC
                         LINES WERE ENLARGED TO DECREASE BACK PRESSURE ON THE PUMP SEALS.  THIS
                         HELPS CORRECT THE LEAKING PROBLEM.

 10/83   SYSTEM                                                                744

 11/83   SYSTEM                                                                720

 12/83   SYSTEM                                                                744

        **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE FGD SYSTEM WAS OFF-LINE FOR APPROXIMATELY 10
                         DAYS IN DECEMBER TO REPAIR A BREAK IN THE REDUCER OFF-GAS PIPELINE.  THIS
                         LINE CARRIES C02 GAS FROM THE REDUCER TO THE CARBONATION COLUMN  WHICH IS
                         PART OF THE NA2C03 REGENERATION SYSTEM.  VIBRATION PROBLEMS WERE ALSO
                         EXPERIENCED WITH THE REDUCER FAN DUE TO MATERIAL BUILD-UP.

                         THE UTILITY REPORTED BRINGING THE FGD SYSTEM BACK TO OPERATION COMPLIANCE
                         LEVELS BY YEAR'S END.

  1/84   SYSTEM                                                                744

  2/84   SYSTEM                                                                696

  3/84   SYSTEM                                                                744

  4/84   SYSTEM                                                                720

  5/84   SYSTEM

  6/84   SYSTEM                                                                720

  7/84   SYSTEM

  8/84   SYSTEM                                                                744

  9/84   SYSTEM                                                                72Q

        **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED PROBLEMS WITH THE MOLTEN SALT REDUCER VESSEL
                         REFRACTORY. THE FGD SYSTEM HAS BEEN ON STANDBY SINCE LATE JANUARY, 1984
                         WITH NO FURTHER TESTING SCHEDULED UNTIL THESE PROBLEMS ARE RESOLVED AND
                         A DECISION IS MADE REGARDING A COURSE OF ACTION.
                                             13-796

-------
                                                  UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER 1984
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 *» FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** ESP
     NUMBER
     NUMBER OF SPARES
     TYPE
     SUPPLIER

 *» PARTICLE SCRUBBER
     NUM3ER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     GAS CONTACTING DEVICE TYPE

«** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN 502 REMOVAL EFFICIENCY - 7.
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED
               (****** LB/MMBTU)
               (»****» LB/MMBTU)
               («**«** LB/MMBTU)
NORTHERN INDIANA PUB SERVICE
SCHAHFER
17
WHEATFIELD
INDIANA
B
******
******
******
*****
  391
  388
  495
  391
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
********       (******* ACFM)
*******        (**** p)
  152.         (  500 FT)
CONCRETE
*******        (***** FT)
               (  10900 BTU/LB)
                10500-11600
COAL
BITUMINOUS
25353.

   10.34
7.8-13.9
   11.25
9.7-13.1
    3.20
2.6-3.6
      .02
0.01-0.02
 1
 0
COLD SIDE
CARBORUNDUM ENVIRONMENTAL SYSTEMS
 0
NONE
N/A
N/A
N/A
THROWAWAY PRODUCT
WET SCRUBBING
DUAL ALKALI
FMC
SARGENT & LUNDY
FULL SCALE
NEW
   90.00
 1
 6/83
 4/83
12/79
                                            13-797

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

NORTHERN INDIANA PUB SERVICE: SCHAHFER 17 (CONT.)
 ** DESIGN AND OPERATING PARAMETERS

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES

 ** MIST ELIMINATOR
     FRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 *# DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
      LINER GENERIC  MATERIAL TYPE
      LINER SPECIFIC MATERIAL  TYPE

 ** DUCTWORK
       SHELL  GENERIC MATERIAL  TYPE
       SHELL  SPECIFIC MATERIAL TYPE
       LINER  GENERIC MATERIAL  TYPE
       LINER  SPECIFIC MATERIAL TYPE

 ** REAGENT  PREPARATION  EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE  TYPE

 ** REAGENT  PREPARATION  EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE  TYPE
NR
NR
IMPINGEMENT TOWER
FIXED BAFFLE
DISC CONTACTOR
FMC
NR
NR
NR
NR
NR
NR
FULL DIAMETER CONE-SPLASH RING CASCADES
 3
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
CENTRIFUGAL
UNIT
FORCED DRAFT
DRY
CARBON STEEL
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
MIX TANK
N/A
AGITATED TANK
SLAKER
NR
NR
                                             13-7°S

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN INDIANA PUB SERVICE: SCHAHFER 17 CCONT.)


 ** PUMPS
     SERVICE                                    NUMBER
     NA                                         »«**

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE                                     THICKENER
     NUMBER                                      2

»** SLUDGE

 ** TREATMENT
     METHOD                                     DEWATERED
     DEVICE                                     N/A
     PROPRIETARY PROCESS                        N/A

 *» DISPOSAL
     NATURE                                     FINAL
     TYPE                                       LANDFILL
     LOCATION                                   UNDECIDED
     SITE TREATMENT              •               NR
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                SOS  PART. HOURS HOURS  HOURS FACTOR


 4/83  SYSTEM                                                                720

 5/83  SYSTEM                                                                744

 6/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM COMMENCED OPERATION IN APRIL AND IS CURRENTLY IN THE STARTUP
                         PHASE OF OPERATION.

 7/83  SYSTEM     100.0       10Q.O       100.0        49.0                  744   364    365  28.8

 8/83  SYSTEM     100.0       100.0       100.0        31.2                  744   232    232  19.4

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS MERE ENCOUNTERED
                         DURING JULY AND AUGUST.

 9/83  SYSTEM     100.0       100.0       100.0        15.1                  720   109    109  10.7

       *« PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM EXPERIENCED BOILER-RELATED PROBLEMS DURING SEPTEMBER.

                                                                             744     0      0     .0

                                                                             720   208    109  12.0

                                                                             744   560    560  34.5

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE FGD SYSTEM AT SCHAHFER  17 EXPERIENCED
                         BOILER-RELATED PROBLEMS DURING THE FOURTH QUARTER OF  1983.

 1/84  SYSTEM     100.0                                   .0                  744     0      0     .0
                                             13-799
10/83 SYSTEM
11/83 SYSTEM
12/83 SYSTEM
100.0
100.0
100.0

100.0
100.0

100.0
100.0
.0
15.1
75.3

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN INDIANA PUB SERVICE: SCHAHFER 17 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER  BOILER   FGD    CAP.
                                                                S02   PART. HOURS HOURS  HOURS FACTOR


       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE UNIT WAS DOWN  DURING  THE ENTIRE MONTH  OF
                         JANUARY.

 2/84  SYSTEM      99.7        99.6        99.6        57.8                  696   404    402  44.1

 3/64  SYSTEM      99.9        99.8        99.8        79.7                  744   594    593  73.2

       *# PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-REUTED PROBLEMS WERE REPORTED  DURING  FEBRUARY AND  MARCH.

 4/84  SYSTEM      *99.9        99.9        99.9        97.6                  720   704    703  91.1

 5/84  SYSTEM      100.0       100.0       100.0        98.5                  744   733    733  83.2

 6/84  SYSTEM      100.0       100.0       100.0        82.5                  720   595    594  67.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED  DURING  THE SECOND
                         QUARTER OF 1984.

 7/84  SYSTEM      100.0       100.0       100.0        99.9                  744   743    743  79.2

 8/84  SYSTEM                 100.0       100.0       100.0                  744   744    744  75.2

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD RELATED OUTAGES WERE REPORTED DURING AUGUST.

                         NO MAJOR FGD RELATED PROBLEMS WERE REPORTED  DURING  JULY AND AUGUST.

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIOHS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR AUGUST AND SEPTEMBER 1984.
                                             13-800

-------
                                                  UTILITY F60 SURVEY: OCTOBER 1983 - SEPTEMBER 198*
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 »» FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - '/.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANSE CHLCSIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
     NUMBER
     TYPE

 ** FABRIC FILTER
     NUMBER
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.
     TYPICAL GAS/CLOTH RATIO - M/MIN

 ** ESP
     NUMBER
     TYPE

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE
NORTHERN STATES POWER
RIVERSIDE
6-7
MINNEAPOLIS
MINNESOTA
E
  172.         (   .400 LB/MMBTU)
  172.         (   .400 LB/MMBTU)
******         (****** LB/MMBTU)
  350
  110
  103
  495
  110
BABCOCK 4 WILCOX
PULVERIZED COAL
PEAK
  320.89
  176.7
                 680000 ACFM)
                 350 F)
                 275 FT)
               (  12.0 FT)
               (   9300 BTU/LB)
                9100-9500
CONCRETE
    3.7
COAL
SUBBITUMINOUS
21632.

    8.00
7.9-8.1
   22.00
20.0-24.0
    1.20
0.9-1.5
********
******
 0
NONE
REVERSE AIR
JOY MANUFACTURING
  320.9        ( 680000 ACFM)
    1.5        ( 6.0 IN-H20)
   99.5
      .5        (  1.8 FT/MIN)
 0
NONE
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                             13-801

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: RIVERSIDE 6-7 (CONT.)
*** FGD SYSTEM

 #* GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN SOS REMOVAL EFFICIENCY - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

  ** DESIGN AND OPERATING PARAMETERS

  ** QUENCHER/PRESATURATOR
     CONSTRUCTION  MATERIAL GENERIC TYPE
     CONSTRUCTION  MATERIAL SPECIFIC TYPE

  ** ABSORBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON  TYPE
     SUPPLIER
     DIMENSIONS  -  FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
      LINER GENERIC MATERIAL
      LINER SPECIFIC MATERIAL
      LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     GAS-SIDE PRESSURE  DROP -  KPA
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY -  X
      PARTICLE REMOVAL EFFICENCY  - X

  »* MIST ELIMINATOR
      FRE-MIST ELIMINATOR/MIST  ELIMINATOR
     NUMBER  PER  SYSTEM
     GENERIC TYPE
      SPECIFIC TYPE
      TRADE NAME/COMMON  TYPE
      CONSTRUCTION  MATERIAL GENERIC TYPE
      CONSTRUCTION  MATERIAL SPECIFIC TYPE

  ** REHEATER
      NUMBER
      GENERIC TYPE
      SPECIFIC TYPE
      TRADE NAME/COMMON  TYPE
      CONSTRUCTION  MATERIAL GENERIC TYPE
      CONSTRUCTION  MATERIAL SPECIFIC TYPE

  **  FANS
      NUMBER
      DESIGN
      SUPPLIER
      FUNCTION
      APPLICATION
     SERVICE
      FLUE GAS  FLOW RATE -  CU.M/S
     CONSTRUCTION  MATERIAL GENERIC TYPE
 THROWAWAY PRODUCT
 SPRAY DRYING
 LIME/SPRAY DRYING
 JOY MFG/NIRO ATOMIZER
 BLACK & VEATCH
 DEMONSTRATION
 RETROFIT
X   99.50
    90.00
  1
 12/80
 11/80
 10/79
 NR
 NR
 SPRAY DRYER
 CROSSFLOW
 ROTARY ATOMIZER
 NIRO ATOMIZER
 46.0 HIGH X 40.0 DIA
 STAINLESS STEEL
 AUSTENITIC
 NR
 NONE
 N/A
 N/A
 NONE
      .5        (
   320.89       (
   176.7        (
    90.0
    99.7
  2.0  IN-H20)
  680000  ACFM)
   350 F)
 NONE
  0
 N/A
 N/A
 N/A
 NR
 NR
  0
 NONE
 N/A
 N/A
 NONE
 N/A
 CENTRIFUGAL
 WESTINGHOUSE
 BOOSTER
 INDUCED DRAFT
 DRY
   160.45
 CARBON STEEL
(  340000 ACFM)
                                             13-802

-------
                                                  UTILITY F60 SURVEY: OCTOBER 1983 - SEPTEMBER
NORTHERN STATES POWER: RIVERSIDE 6-7 (CONT.)
 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER
     FULL LOAD DRY FEED CAPACITY - M.TONS/HR

 »* REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER
     FULL LOAD DRY FEED CAPACITY - M.TONS/HR
     PRODUCT QUALITY - X SOLIDS

 ** TANKS
     SERVICE
     NR

 ** PUMPS
     SERVICE
     SLURRY TRANSFER

 «* SOLIDS CONCENTRATING/DEWATERING
     DEVICE

*** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY  PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT

 ** PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     MONITOR LOCATION
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE

 ** FGD SPARE CAPACITY INDICES
     ABSORBER - X
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
SLAKER
NR
NR
JOY/DENVER
 1
    9.1
(   10 TPH)
WET BALL MILL
COMPARTMENTED
NR
JOY/DENVER
 1
    4.5        (
   35.0
NUMBER

   Z


NUMBER

   5


NONE
N/A
N/A
N/A
FINAL
LANDFILL
OFF-SITE
TRUCK
NONE
OUTLET TEMP
DRYER OUTLET
AUTOMATIC
FEEDBACK
     .0
    5 TPH)
                                            13-803

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER 1984

KORTHERN STATES POWER: RIVERSIDE 6-7 (CONT.)
 ** FGD SPARE COMPONENT INDICES
     ABSORBER                                         -0
_.__._..——.-.	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD    CAP.
                                                                S02  PART. HOURS  HOURS  HOURS FACTOR


11/80  SYSTEM                                                                 720

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         OPERATIONS AT THE RIVERSIDE UNIT COMMENCED IN NOVEMBER 1980.  BY THE  END
                         OF NOVEMBER SUFFICIENT CHECKOUT HAD BEEN ACCOMPLISHED TO PERMIT PRELIMINARY
                         FGD AND  ESP OPERATION AND TEST WORK.

12/80  SYSTEM                                                                 744

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         IN DECEMBER THE  FGD SYSTEM WAS IN A PRELIMINARY OPERATION MODE  AND THE
                         NEW ID FANS AND  BAGHOUSE WERE IN FINAL CHECKOUT.

  1/81  SYSTEM                                                                 744

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         BY MID-JANUARY THE PRELIMINARY CHECKOUT WAS COMPLETED AND THE NEW ID FANS
                         AND BAGHOUSE WERE BROUGHT INTO SERVICE WITHOUT THE  FGD SYSTEM IN
                         OPERATION.

  2/81  SYSTEM                                                                 672

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE NEW  ID FANS  AND BAGHOUSE OPERATED WITHOUT THE FGD SYSTEM  UNTIL  LATE
                         FEBRUARY SO THAT THE BOILER DRAFT CONTROL SYSTEM COULD BE ADJUSTED.   AT
                         THE CONCLUSION OF THE PERIOD, FULL  LOAD BAGHOUSE PERFORMANCE  TESTING WAS
                         ACCOMPLISHED.  RESULTS OF THE TESTS SHOWED NEGLIGIBLE TEMPERATURE CHAKGES
                         ACROSS THE FGD MODULE (WHICH WAS ACTING ONLY AS A BYPASS DUCT), A SMALL
                         TEMPERATURE CHAN3E ACROSS THE BAGHOUSE, STACK OPACITIES  OF LESS THAN 5X
                         FOR THE  RIVERSIDE STACK DIAMETER, AND AN OUTLET MASS LOADING  OF LESS THAN
                         0.03  LB/MMBTU.

                         BEGINNING IN  LATE FEBRUARY AND CARRYING THROUGH EARLY MARCH,  THE FGD
                         SYSTEM OPERATED  TO PERFORM THE FINAL TUNING OF THE  ANALOG AND COMPUTER
                         CONTROL  SYSTEM.

  3/81   SYSTEM                                                                744

        »*  PROBLEMS/SOLUTIONS/COMMENTS

                         ON MARCH 12,  THE ENTIRE NEW SYSTEM  WAS OPERATED FOR THE  FIRST TIME.   A
                         KEEK  LATER THE BOILER AND TURBINE EXPERIENCED PROBLEMS  LIMITING OPERATION.
                         BUT,  BY  MARCH  19, THE ENTIRE SYSTEM WAS OPERATING WITH THE LOAD INCREASING
                         AS THE  PLANT  REPAIR WORK WAS BEING  COMPLETED.  BY MARCH  21, THE SYSTEM WAS
                         INTO  FGD AND  BAGHOUSE PARAMETRIC TESTING AT FULL  LOAD.   SINCE THAT  TIME,
                         NEARLY ALL THE KEY TEST PARAMETERS  HAVE DEMONSTRATED AT  SEVERAL LEVELS.

  4/81   SYSTEM                                                                720

        **  PROBLEMS/SOLUTIONS/CCMMENTS

                         THE UTILITY  REPORTED  THAT A  PROBLEM WITH THE  START-UP OF THE MATERIAL
                         DISCHARGE SYSTEM HAS  BEEN CAUSED BY A  FAULTY  MATERIAL SPECIFICATION ON THE
                         CHAIN CONVEYOR AND SEVERAL  LEGS  OF  TEMPORARY  DENSE  PHASE PNEUMATIC  PIPING.
                         AS OF APRIL,  A NEW CONVEYOR OF HARDER  MATERIAL HAD  BEEN  INSTALLED AND ALL
                         TEMPORARY DISCHARGE PIPING REMOVED.
                                             13-804

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: RIVERSIDE 6-7 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 5/81  SYSTEM                                                                744

 6/81  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE MONTHS OF MAY AND JUNE.

 7/81  SYSTEM                                                                744

 8/81  SYSTEM                                                                744

 9/81  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE THIRD QUARTER OF 1981.

10/81  SYSTEM                                                                744

11/81  SYSTEM                                                                720

12/81  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FOURTH QUARTER OF 1981.

 1/82  SYSTEM                                                                744

 2/82  SYSTEM                                                                672

 3/82  SYSTEM                                                                744

       »* FRCBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FIRST QUARTER OF 1982.

 4/82  SYSTEM                                                                720     0            .0

 5/82  SYSTEM                                                                744     0            .0

 6/82  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE  UNIT WAS DOWN ALL OF APRIL  AND MAY  FOR
                         A SCHEDULED TURBINE OUTAGE.  THE FGD SYSTEM WAS AVAILABLE APPROXIMATELY
                         90X DURING JUNE.

 7/82  SYSTEM                                                                744

 8/82  SYSTEM                                                                744

 9/82  SYSTEM                                                                720

10/82  SYSTEM                                                                744

11/82  SYSTEM                                                                720
                                             13-OC5

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

NORTHERN STATES POWER: RIVERSIDE 6-7 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD    CAP.
                                                                S02   PART.  HOURS  HOURS  HOURS FACTOR
..«=,.__ .. — — ——_ __..._..._<_. „„«,___— — _—— ____— — — ——«».— ...._____..-_—  — —— — —  — _—— _  ......  ._—.——  ..._ — ...__.

12/82  SYSTEM                                                                 744

  1/83  SYSTEM                                                                 744

  2/83  SYSTEM                                                                 672

  3/83  SYSTEM                                                                 7**

  4/83  SYSTEM                                                                 720

  5/83  SYSTEM                                                                 744

  6/83  SYSTEM                                                                 720

       **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE  UTILITY REPORTED THAT THE  FGD  SYSTEM OPERATED  CONTINUOUSLY  THROUGHOUT
                          THE  PERIOD  AND  THAT NO  MAJOR SCHEDULED OR FORCED OUTAGES WERE ENCOUNTERED.
                          FGD  SYSTEM  AVAILABILITY FOR THE  PERIOD OF JULY  1982 THROUGH  JUNE 1933 WAS
                          APPROXIMATELY 80 X.

  7/83  SYSTEM                                                                 744

  8/83  SYSTEM                                                                 744

  9/83  SYSTEM                                                                 720

       #* PROBLEMS/SOLUTIONS/COMMENTS

                          THE  UTILITY REPORTED THAT FGD  SYSTEM AVAILABILITY  WAS APPROXIMATELY  60 TO
                          90X  DURING  THE  THIRD QUARTER OF  1983.

                          THE  UTILITY REPORTED PROBLEMS  MAINTAINING AN ADEQUATE PERCENTAGE OF  SOLIDS
                          IN THE SLURRY DUE  TO A  RECYCLE ASH CONVEYOR  TRIP AND FAILING DOUBLE  FLAP
                          VALVES ON THE BAGHOUSE.

                          THE  UTILITY REPORTED SLURRY PUMP PROBLEMS DURING THE THIRD QUARTER.

 10/83   SYSTEM                                                                 744

 11/83   SYSTEM                                                                 720

 12/83  SYSTEM                                                                 744

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE  UTILITY REPORTED THAT FGD  SYSTEM AVAILABILITY  WAS APPROXIMATELY  75 PER-
                          CENT DURING THE FOURTH  QUARTER OF  1983.

                          A THREE-WEEK  FORCED OUTAGE OCCURRED DURING  THE  FOURTH QUARTER DUE TO BEAR-
                          ING  FAILURES  ON A  BAGHOUSE REVERSE AIR FAN.  BOTH  THE MOTOR  AND FAN
                          EXPERIENCED BEARING  FAILURES.

                          THE  UTILITY SWITCHED FROM BELT-DRIVE TO  DIRECT-DRIVE BAGHOUSE REVERSE AIR
                          FANS DUPING THE FOURTH  QUARTER OF  1983 TO  ELIMINATE PROBLEMS WITH MAINTAIN-
                          ING  PROPER  BELT TENSION.

                          THE  UTILITY REPORTED A  FOUR-DAY  FGD SYSTEM  OUTAGE  DURING THE FOURTH  QUARTER
                          DUE  TO THE  REMOVAL OF  BUILD-UP FROM THE  ABSORBER  BOTTOM ASH  OUTLET.   THE
                          UTILITY WAS TESTING  THE USE  OF PULVERIZED  LIMESTONE WITH CALCIUM CHLOPIDE
                          AS AN ADDITIVE  TO  INCREASE  REMOVAL EFFICIENCY.   A BUILD UP ON THE ABSORBER
                          WALLS RESULTED  WHICH SUBSEQUENTLY  DROPPED  OFF  AND  FELL  TO THE BOTTOM ASH
                          OUTLET.  A  CREW HAD  TO  BE  SENT IN  TO  REMOVE THE MATERIAL.
                                             13-806

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: RIVERSIDE 6-7 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         THE UTILITY REPORTED SEVERAL SLURRY PUMP SEAL PROBLEMS DURINS THE FOURTH
                         QUARTER OF 19S3.  CONSIDERABLE MAINTENANCE TIME WAS REQUIRED CO MAKE INDI-
                         VIDUAL REPAIRS, HOWEVER, THE FSD SYSTEM AS A WHOLE WAS NOT AFFECTED.

                         THE UTILITY REPORTED AN ATOMIZER FAILURE DURING THE FOURTH QUARTER
                         THAT WAS DUE TO A LACK OF LUBRICATING OIL.

 1/84  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         FGD SYSTEM AVAILABILITY FOR THE FIRST QUARTER WAS ESTIMATED AT 85X.

                         PLUGGED SLURRY PUMPS RESULTED IN FGD OUTAGE TIME DURING THE FIRST QUARTER.

                         DURINS THE FIRST QUARTER OF 1984, THE LOSS OF A REVERSE AIR FAN FOR THE
                         BAGHOUSE CONTRIBUTED TO LOWERED AVAILABILITY FOR THE FGO SYSTEM.

 4/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE UNIT OPERATED ONLY 50 HOURS DURING APRIL
                         DUE TO LOW POWER DEMAND. THE FGD SYSTEM ONLY OPERATED 17 HOURS DURING
                         THE MONTH.

 5/84  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT FGD SYSTEM AVAILABILITY DURING MAY WAS
                         APPROXIMATELY 84X.  321 OPERATING HOURS WERE REPORTED.

 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       #* PROBLEMS/SOLUTIONS/COMMENTS

                         A SCHEDULED OUTAGE  WAS REPORTED FOR THE PERIOD OF JUNE 2 TO AUGUST  1, 1984.

                         THROUGHOUT THE FIRST THREE QUARTERS OF 1984, THE UTILITY EXPERIENCED
                         PROBLEMS WITH PLUGGED LINES TO THE ATOMIZER FEED SYSTEM.  THE RESULTING
                         FLOW  LIMITATION LOWERED REMOVAL EFFICIENCIES.

                         BAGHOUSE PROBLEMS CONTINUED THROUGH THE FIRST THREE QUARTERS OF 1984.
                                             13-607

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC  FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW
NORTHERN STATES POWER
SHERBURNE
1
BECKER
MINNESOTA
C
37. ( .087
413. ( .960
****** ( ******
1420
750
710
740
750






LB/MMBTU )
LB/MMBTU )
LB/MMBTU)





  ** UNIT DATA  -  BOILER  AND  STACK
      BOILER  SUPPLIER
      BOILER  TYPE
      BOILER  SERVICE  LOAD
      DESIGN  BOILER FLUE GAS FLOW  -  CU.M/S
      BOILER  FLUE GAS  TEMPERATURE  -  C
      STACK HEIGHT -  M
      STACK SHELL
      STACK TOP DIAMETER - M

  ** FUEL DATA
      FUEL TYPE
      FUEL GPADE
      AVERAGE HEAT CONTENT - J/G
      RANGE HEAT  CONTENT - BTU/LB
      AVERAGE ASH CONTENT -  7.
      RANGE ASH CONTENT  - 7.
      AVERAGE MOISTURE CONTENT - 7.
      RANGE MOISTURE  CONTENT - 7.
      AVERAGE SULFUR  CONTENT - 7.
      RANGE SULFUR CONTENT - 7.
      AVERAGE CHLORIDE CONTENT - 7.
      RANGE CHLORIDE  CONTENT - 7.

 *** PARTICLE CONTROL

  ** MECHANICAL COLLECTOR
      NUMBER
      TYPE

  ** ESP
      NUMBER
      TYPE

  ** PARTICLE SCRUBBER
      NUMBER
      NUMBER  OF SPARES
      INITIAL START-UP DATE
      GENERIC TYPE
      SPECIFIC  TYPE
      TRADE NAME/COMMON  NAME
      SUPPLIER
      DIMENSIONS  - FT
      SHELL GENERIC MATERIAL
      SHELL SPECIFIC  MATERIAL
      LINER GENERIC MATERIAL
      LINER SPECIFIC  MATERIAL
      GAS CONTACTING  DEVICE  TYPE
      NUMBER  OF CONTACTING ZONES
      LIQUID  RECIRCULATION RATE -  LITER/S
      L/G RATIO - LITER/CU.M
      PRESSURE  DRCP -  KPA
      SUPERFICIAL GAS VELOCITY - M/S
      INLET GAS FLOW  RATE  -  CU.M/S
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
 1349.16
  154.4
  198.
CONCRETE
               (2859000 ACFM)
               (  310 F)
               (  650 FT)
               (  32.6 FT)
               (  8400 BTU/LB)
                6300-8500
    9.9
COAL
SUBBITUMINOUS
19538.

    9.00
******
   25.00
******
     .80
******
     .03
******
 0
NONE
 0
NONE
12
 2
 3/76
VENTURI TOWER
VARIABLE-THROAT/VERTICALLY-ADJUSTABLE ROD DECKS
ROD SCRUBBER
COMBUSTION ENGINEERING
3.0 X 25.5
STAINLESS STEEL
AUSTENITIC
NONE
N/A
TYPE 304 STAINLESS STEEL RODS
 2
  223.0        ( 3540 GPM)
    1.8        (13.6 GAL/1000ACF)
    3.5        (14.0 IN-H20)
   24.4        (   80.0 FT/S)
  122.6        ( 259900 ACFM)
                                             13-808

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
NORTHERN STATES POWER: SHERBURNE 1 (CONT.)

     INLET GAS TEMPERATURE - C
     PARTICLE REMOVAL EFFICIENCY - X

*** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X
     DESIGN COAL HEAT CONTENT - J/G
     DESIGN COAL ASH CONTENT - X
     DESIGN MOISTURE CONTENT - X
     SPACE REQUIREMENTS - SQ M
     OPER. * MAINT. REQUIREMENT - MANHR/DAY

 ** QUENCHER/PRESATURATOR
     NUMBER

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE -  LITER/S
     L/C RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X
     PARTICLE REMOVAL EFFICENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     FREEBOARD DISTANCE - M
     DISTANCE BETWEEN STAGES - CM
                (   310 F)
    99.0
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIMESTONE/ALKALINE FLYASH
 NONE
 COMBUSTION ENGINEERING
 BLACK t VEATCH
 FULL SCALE
 NEW
X   99.00
    50.00
     4.0
  1
  5/76
  3/76
  0/71
      .70
 19305.8
     9.00
    28.00
  1312.0
   212.0
(   8300 BTU/LB)


(   14123 SQ FT)
 12
  2
 SPRAY TOWER
 OPEN COUNTERCURRENT SPRAY
 N/A
 COMBUSTION ENGINEERING
 18 X 26.5 X 60
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 GLASS FLAKE-FILLED POLYESTER
 FLAKELINE 151
 NONE
   378.
     2.9
     1.5
     3.0
   129.77
    54.4
    50.0
    99.0
  6000 GPM)
  21.8 GAL/1000 ACF)
  6.0 IN-H20)
  10.0 FT/S)
  275000 ACFM)
   130 F)
 PRIMARY COLLECTOR
 12
  2
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 HORIZONTAL
     2
     3
     3.20
    25.40
(10.5 FT)
(10.0 IN)
                                            13-809

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*
NORTHERN STATES POWER: SHERBURNE 1 (CONT.)

     DISTANCE BETWEEN VANES - CM
     PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH FREQUENCY
     WASH RATE - L/S

 ** REHEATER
     NUMEER
     NUMBER OF SPARES
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     LOCATION
     TEMPERATURE INCREASE - C
     INLET FLUE GAS FLOW RATE - CU. M/S
     INLET FLUE GAS TEMPERATURE - C
     OUTLET FLUE GAS TEMPERATURE - C
     NUMBER OF HEAT EXCHANGER BANKS
     NUMBER OF TUBES PER BUNDLE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

  «*  FANS
     NUMBER
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

  «*  DAMPERS
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

  **  DAMPERS
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

  »*  DAMPERS
      GENERIC TYPE
      SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
      CONSTRUCTION MATERIAL SPECIFIC TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

  **  DUCTWORK
      LOCATION
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC  MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC  MATERIAL TYPE

  »*  DUCTWORK
     LOCATION
       SHELL GENERIC MATERIAL TYPE
                 4.00 IN)
                  .5 IN-H20)
                 10.0 FT/S)
   10.2        (
     .1        (
    3.0        (
ORGANIC
FIBER-REINFORCED POLYESTER
MAKE-UP WATER
ONCE PER 24 HRS
  126.2        ( 2000 GAL/MIN)
12
 2
 1
IN-LINE
HOT WATER
FIN TUBE
10 FT ABOVE ME
   22.2
   94.38
   54.4
   76.7
   4
  45
CARBON STEEL
AISI 1110
                   40 F)
                 200000 ACFM)
                  130 F)
                  170 F)
               (  200000 ACFM)
               (   170 F)
CENTRIFUGAL
GREEN FAN
UNIT
INDUCED DRAFT
DRY
   94.38
   76.7
CARBON STEEL
BUTTERFLY
N/A
CARBON STEEL
AISI 1110
NONE
N/A
BUTTERFLY
N/A
CARBON STEEL
AISI 1110
NONE
N/A
LOUVER
PARALLEL BLADE MULTILOUVER
CARBON STEEL
AISI 1110
NONE
N/A
SCRUBBER INLET
CARBON STEEL
AISI 1110
NONE
N/A
REHEATER TO STACK
CARBON STEEL
                                             13-810

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 198*
NORTHERN STATES POWER: SHERBURNE 1 (CONT.)

      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER
     NUMBER OF SPARES
     FULL LOAD DRY FEED CAPACITY - M.TONS/HR
     PRODUCT QUALITY - X SOLIDS

 *» TANKS
     SERVICE
     ABSORBER RECYCLE
     MAKEUP WATER
     REAGENT PREP PRODUCT

 ** PUMPS
     SERVICE
     PONO RETURN
     THICKENER UNDERFLOW
     MAKEUP WATER
     REHEAT WATER
     ABSORBER RECIRCULATION
     LIMESTONE CLASSIFIER RECYCLE
     LIMESTONE DILUTION
     LIMESTONE SLURRY TRANSFER

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

 *** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT
     SITE DIMENSIONS
     SITE CAPACITY - CU.M

 ** PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     PHYSICAL VARIABLES
     CONTROL LEVELS
     MONITOR TYPE
AISI 1110
NONE
N/A
MET BALL MILL
COMPARTMENTED
NR
ALLIS CHALMERS
 1
 0
   21.8
   65.0
                                                NUMBER
(   24 TPH)
  12
   2
NUMBER

   1
   1
   1
   Z
   Z
****
«***
*«**
THICKENER
 2
1
160.0 DIA X 10.0
CARBON STEEL
AISI 1110
NONE
N/A
ABSORBER BLEED
10X SOLIDS
28X SOLIDS
POND
LIMESTONE SLURRY TRANSFER TAW,
                          X  *
FORCED OXIDATION
REACTION TANK
N/A
FINAL
POND
ON-SITE
PIPELINE
CLAY LINING
62 ACRES X 50 FT
   3791300
(   3100.0 ACRE-FT)
SLURRY PH, S02
PRESSURE DROP, PERCENT SOLIDS, TANK LEVELS
PRESSURE DROP 12 IN H20, 10X SOLIDS, PH=5-5.5
DUPONT IS021
                                            13-811

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: SHERBURNE 1 (CONT.)
     MONITOR LOCATION
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE

 ** WATER BALANCE
     WATER LOOP TYPE
     RECEIVING WATER STREAM
     SOURCE OF MAKEUP WATER

 ** CHEMICALS AND CONSUMPTION
     FUNCTION
     NAME
     PRINCIPAL CONSTITUENT
     CONSUMPTION
     POINT OF ADDITION

 ** FGD SPARE CAPACITY INDICES
     ABSORBER - X

 ** FGD SPARE COMPONENT INDICES
     ABSORBER
                 BOILER OUTLET & ON MODULES [S02J
                 AUTOMATIC
                 FEEDBACK
                 OPEN
                 MISSISSIPPI RIVER
                 RIVER WATER i COOLING TOWER SLOWDOWN
                 ABSORBENT
                 LIMESTONE
                 95X CAC03
                 3.0-3.5 TPH
                 BALL MILL
                     9.0
                     1.0
 	PERFORMANCE DATA	
 PERIOD  MODULE  AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                 X REMOVAL
                                 S02  PART.
                     PER  BOILER  FGD   CAP.
                    HOURS HOURS  HOURS FACTOR
  3/76   SYSTEM
  4/76  SYSTEM
                                              720
        ** PROBLEMS/SOLUTIONS/COMMENTS
                           DURING JANUARY A PRELIMINARY SYSTEM CHECKOUT WAS SUCCESFULLY  COMPLETED BY
                           PASSING AIR AND WATER THROUGH THE SYSTEM.  THE SCRUBBING SYSTEM  BEGAN FGD
                           OPERATIONS ON MARCH  16.  THE SHAKEDOWN PHASE OF OPERATIONS CONTINUED
                           THROUGH APRIL.
  5/76
        101
        102
        103
        104
        105
        106
        107
        108
        109
        110
        111
        112
        SYSTEM
                    86.0
62.0
83.0
81.0
59.0
72.0
90.0
57.0
69.0
60.0
75.0
72.0
67.0
77.0
55.0
73.0
72.0
52.0
64.0
80.0
50.0
61.0
53.0
66.0
64.0
59.0
68.1
                                                                              744    657
                                                                                           506   57.8
        *» PROBLEMS/SOLUTIONS/COMMENTS
                           FIRST COMMERCIAL  OPERATION COMMENCED MAY  1,  1976.   THIS  IS  AN  INTERMEDIATE
                           LOAD  UNIT  OPERATING  NEAR  FULL CAPACITY DURING  THE DAY  AND 35X
                           CAPACITY AT  NIGHT.
  6/76  SYSTEM      84.0

        ** PROBLEMS/SOLUTIONS/COMMENTS
                                              720   688
                                                                69.9
                           MODIFICATIONS  ARE  CONTINUING ON THE SPRAY  SYSTEM,  SPRAY  NOZZLES AND
                           STRAINER  SYSTEM.

                           SINCE  APRIL  THE UTILITY  AND SYSTEM SUPPLIER  HAVE BEEN MAKING CONTINUAL
                           SYSTEM MODIFICATIONS,  REQUIRING THE UNIT TO  OPERATE  AT NO  GREATER  THAN
                           SOX CAPACITY.

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
NORTHERN STATES POWER: SHERBURNE 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                             X REMOVAL   PER  BOILER  FGD   CAP.
                                             S02  FART.  HOURS HOURS  HOURS FACTOR
7/76 101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM 84.0
80.0
62.0
71.0
81.0
80.0
68.0
81.0
75.0
79.0
63.0
91.0
69.0
81.8
55.0
43.0
49.0
56.0
55.0
47.0
56.0
52.0
54.0
43.0
63.0
48.0
56.5 744 512 419 49.0
       *« PROBLEMS/SOLUTIONS/COMMENTS
                          THE SLURRY NOZZLES ARE FREQUENTLY PLUGGED BY PARTICLES ABOVE QUARTER INCH
                          SIZE.  STRAINER MODIFICATIONS ARE PLANNED TO ALLEVIATE THIS PROBLEM.

                          HARD SCALE GYPSUM FORMATION ON THE VESSEL WALLS HAS LEVELED OFF.  THE
                          CLEANING  PROCESS CALLS FOR THREE TO FOUR MODULES TO BE TAKEN OUT OF
                          SERVICE EACH NIGHT.  THUS, EACH MODULE IS CLEANED ONCE EVERY THREE DAYS.

                          A  70-MAN  CREW IS REQUIRED TO MAINTAIN SCRUBBER OPERATIONS.

                          THE DEPOSITION OF SOFT SOLIDS IS STILL CONTINUING IN THE REHEATERS.

                          SOFT SOLIDS ACCUMULATION IN THE MIST ELIMINATORS IS STILL CAUSING
                          PROBLEMS.
  8/76   101
        102
        103
        104
        105
        106
        107
        108
        109
        110
        111
        112
        SYSTEM

  9/76   101
        102
        103
        104
        105
        106
        107
        108
        109
        110
        111
        112
        SYSTEM
94.0
95.0
46.0
93.0
51.0
64.0
83.0
76.0
71.0
84.0
81.0
76.0
87.0
91.0
83.9

87.0
90.0
93.0
76.0
76.0
79.0
85.0
79.0
85.0
80.0
92.0
96.0
92.6
44.0
88.0
48.0
80.0
79.0
72.0
67.0
80.0
77.0
72.0
82.0
86.0
79.6

68.0
71.0
73.0
60.0
60.0
62.0
69.0
62.0
67.0
63.0
72.0
76.0
73.0
                                                          744   705
                                                                       592  76.5
                                                          720   566
                                   524  65.6
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE STRAINER SYSTEM IS BEING MODIFIED.  THE DUPLEX UNITS  ARE TO  BE
                          REPLACED BY IN-TANK SCREENS AND  SOOT BLOWERS.  BOTH  ARE LOCATED  AT  THE
                          SUCTION SIDE OF THE SPRAY HATER  PUMP.
                                             13-813

-------
UTILITY FGD SURVEY? OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: SHERBURNE 1 (CONT.)
__	PERFORMANCE DATA	.	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR
                          CARBON STEEL FIN TUBE REHEAT BUNDLES ARE AN AREA OF CONCERN.
                          FAILURES IN FOUR UNITS HAVE BEEN EXPERIENCED.
                                                                                 MULTIPLE
10/76
101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM
                    92.9
 97.0
 84.0
 96.0
 96.0
 95.0
 30.0
 74.0
 76.0
 91.0
 81.0
100.0
 87.0
 91.6
79.0
68.0
73.0
78.0
77.0
24.0
60.0
62.0
74.0
66.0
81.0
71.0
74.4
                                                                              744   606
                                                                                          554
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          THE UTILITY IS CONSIDERING MODIFYING THE DESIGN OF THE SHERBURNE  1 AND
                          FGD SYSTEMS FROM MARBLE BED TO SPRAY TOWER ABSORBERS.  AT  PRESENT ONE
                          MODULE AT SHERBURNE 1 HAS BEEN CONVERTED TO A SPRAY TOWER  ON AN EXPER-
                          IMENTAL BASIS.
 11/76
 12/76
101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM

101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM
                    93.0
                    94.7
 83.0
 80.0
 87.0
 79.0
 92.0
 80.0
 93.0
 89.0
 69.0
 78.0
 73.0
 93.0
 90.6

 83.0
 84.0
 87.0
 80.0
 71.0
 97.0
 91.0
 95.0
 94.0
 88.0
 73.0
 75.0
 93.0
83.0
80.0
87.0
79.0
92.0
80.0
93.0
89.0
69.0
78.0
73.0
93.0
90.6

85.0
82.0
84.0
78.0
69.0
94.0
88.0
92.0
91.0
85.0
71.0
73.0
90.2
                                                                              720    720
652  88.4
                                                                              744    722
                                                                                           671   87.4
        ** PROBLEMS/SOLUTIONS/COMMENTS
                           THE UTILITY IS NOW CONDUCTING  A  FULL-LOAD  EVALUATION  STUDY,  ANALYZING
                           SYSTEM OPERATION ON 10  MODULES VS.  THE  DESIGNED  11  MODULES.

                           APPROXIMATELY ONE-THIRD OF  THE STRAINER MODIFICATIONS ON MODULE 101 ARE
                           COMPLETED.

                           THE UNIT IS CURRENTLY HAVING DIFFICULTY COMPLYING WITH THE  20X OPACITY
                           REGULATION  DUE TO THE EXTREMELY  FINE FLY ASH  BEINS  EMITTED  < 70X LESS THAN
                           1 MICRON).
                                             13-814

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*
NORTHERN STATES POWER: SHERBURNE 1 (CONT.)
PERIOD
1/77












2/77












3/77












MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION X REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR
101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM 90.0
101
102
103
104
105
106
107
103
109
110
111
112
SYSTEM 91.0
101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM 95.0
94.0
75.0
99.0
76.0
96.0
77.0
70.0
92.0
61.0
40.0
75.0
95.0
88.2
89.0
99.0
64.0
96.0
64.0
99.0
81.0
62.0
98.0
93.0
98.0
61.0
91.3
47.0
92.0
95.0
93.0
93.0
95.0
83.0
93.0
95.0
83.0
73.0
72.0
93.1
77.0
61.0
81.0
62.0
78.0
63.0
57.0
75.0
66.0
33.0
61.0
76.0
71.8 744 607 535 70.1
81.0
90.0
58.0
87.0
58.0
90.0
73.0
56.0
89.0
84.0
89.0
55.0
82.7 672 609 556 79.5
47.0
92.0
95.0
93.0
93.0
95.0
88.0
93.0
95.0
83.0
78.0
72.0
93.0 744 743 692 92.8
        «*  PROBLEMS/SOLUTIONS/COMMENTS
                           ALL MODULES ARE  HOW FITTED  WITH  IN-TANK  STRAINERS.   LOW JANUARY-MARCH
                           OPERASILITIES RESULTED  FROM COMPLETION OF  STRAINER MODIFICATIONS.
  4/77  101
        102
        103
        104
        105
        106
        107
        108
        109
        110
        111
        112
        SYSTEM

  5/77  101
95.0
            84.4
            65.3
            92.5
            95.4
            96.2
            62.2
            72.8
            91.4
            5S.
            92.
            90.
            87.
.5
.9
.4
.9
            90.0
            96.5
                      84.2
                      65.1
                      92.2
                      95.1
                      96.0
62,
72.
91.
58.
92.6
90.1
87.6
89.7

40.5
                                                          720   718
                                                         646  86.4
                                             13-815

-------
UTILITY F6D SURVEYS OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: SHERBURNE 1 (CONT.)
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION X REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR
102
103
104
105
106
107
108
109
110
111
112
SYSTEM 92.0
6/77 101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM 92.0
48.1
92.3
87.2
94.9
96.5
81.4
97.8
95.8
77.9
34.9
86.9
90.0
76.0
77.0
75.0
75.0
30.0
87.0
58.0
44.0
61.0
80.0
.0
83.0
67.8
20.2
38.7
36.6
39.8
40.5
34.1
41.0
40.2
32.7
14.7
36.4
37.8 744 312 281 35.6
26.0
27.0
26.0
26.0
10.0
30.0
20.0
15.0
21.0
28.0
.0
29.0
23.4 720 248 168 23.9
        *« PROBLEMS/SOLUTIONS/COMMENTS
                           A  SCHEDULED  TURBINE OVERHAUL  LASTED  FROM MAY  14  TO  JUNE  18.

                           THE  EVALUATION  STUDY  INITIATED DURING  THE NOVEMBER-DECEMBER  PERIOD WAS
                           TEMPORARILY  TERMINATED  SO  THAT STRAINER MODIFICATIONS  COULD  BE  COMPLETED.
                           THE  STUDY  SHOULD  BEGIN  AGAIN  IN  THE  NEAR FUTURE.
  7/77  101
        102
        103
        104
        105
        106
        107
        103
        109
        110
        111
        112
        SYSTEM
                    97.0
                        93.0
                        66.0
                        92.0
                        90.0
                        92.0
                        94.0
                        91.0
                        17.0
                        94.0
                        83.0
                        78.0
                        83.0
                        88.5
                        92.0
                        65.0
                        91.0
                        89.0
                        91.0
                        93.0
                        90.0
                        17.0
                        93.0
                        82.0
                        77.0
                        82.0
                        87.5
                                                                              744   736
                                                                                           651  86.6
        ** PROBLEMS/SOLUTIONS/COMMENTS
                           SOME STAINLWSS STEEL MODIFICATIONS  TOOK  PLACE.

                           WHILE THE UNIT WAS OUT IN JUNE  THE  FGD SYSTEM WAS CLEANED.   THIS CLEANING
                           WAS CREDITED FOR ONE OF THE HIGHEST AVAILABILITIES EVER DEMONSTRATED ON
                           THIS UNIT.
  8/77
101
102
103
104
105
106
85.0
89.0
66.0
55.0
81.0
90.0
                                                        73.0
                                                        77.0
                                                        57.0
                                                        47.0
                                                        70.0
                                                        77.0
                                             13-816

-------
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 198*
NORTHERN STATES POWER: SHERBURNE 1 (CONT.)
PERIOD MODULE AVAILABILITY
107
108
109
110
111
112
SYSTEM 95.0
OPER ABILITY
83.0
79.0
72.0
85.0
90.0
66.0
85.6
RELIABILITY UTILIZATION
71.0
68.0
62.0
73.0
77.0
57.0
73.6
X REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR






744 640 548 64.9
       #* PROBLEMS/SOLUTIONS/COMMENTS
                          ONLY REGULAR MAINTENANCE WAS REQUIRED ON THE FGD SYSTEM IN AUGUST.
 9/77
101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM
                   95.0
                               86.0
                               85.0
                               88.0
                               92.0
                               83.0
                               44.0
                               83.0
                               90.0
                               84.0
                               77.0
                               77.0
                               82.0
                               88.7
82.0
81.0
84.0
88.0
84.0
42.0
79.0
86.0
80.0
73.0
73.0
78.0
84.6
                                                                             720   686
                                                                                   609  78.2
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          TWENTY-FOUR PUMPS ARE BEING COMPLETELY OVERHAULED.

                          THE MODULE 106 SPRAY WATER PUMP WAS OVERHAULED IN SEPTEMBER.

                          SOME ANGLES WERE INSTALLED ON THE PRIMARY CONTACTOR RODS TO l!ESIST
                          EROSION.
 10/77
       101
       102
       103
       104
       105
       106
       107
       108
       109
       110
       111
       112
       SYSTEM
            88.0
                        70.0
                        81.0
                        95.0
                        97.0
                        63.0
                        35.0
                        87.0
                        99.0
                        96.0
                        39.0
                        58.0
                        96.0
                        83.3
57.0
66.0
78.0
79.0
52.0
29.0
71.0
81.0
79.0
32.0
47.0
79.0
68.2
                      744   609
507  65.5
        **  PROBLEMS/SOLUTIONS/COMMENTS
                           STRAINER/WASHER SCREEN  EROSION HAS BEEN A PROBLEM.  REPAIR AND REPLACEMENT
                           HAS  BEEN  CONTINUALLY NECESSARY.   316L 55 MATERIAL WILL BE USED IN THE
                           FUTURE.
 11/77   101
        102
        103
        104
        105
        106
        107
        108
                        77.0
                        91.0
                        42.0
                        86.0
                        79.0
                        82.0
                        87.0
                        91.0
76.0
89.0
41.0
84.0
77.0
80.0
85.0
89.0
                                             13-817

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: SHERBURNE 1 (CONT.)
PERIOD MODULE AVAILABILITY

109
110
111
112
SYSTEM 92.0
OPERABILITY

89.0
89.0
92.0
52.0
87.0
RELIABILITY UTILIZATION

87.0
87.0
90.0
51.0
85.1
X REMOVAL PER
S02 PART. HOURS




720
BOILER
HOURS




705
FGD
HOURS




613
CAP.
FACTOR




77.4
       **  PROBLEMS/SOLUTIONS/COMMENTS
                          THE REPLACEMENT PROGRAM WILL BEGIN ON DECEMBER 21, 1977.  IT TAKES FOUR TO
                          SIX DAYS FOR WORK ON EACH MODULE TO REPLACE THE STRAINER SYSTEM.

                          LOW MODULE OPERABILITIES WERE PRIMARILY A RESULT OF SPRAY WATER PUMP OVER-
                          HAULS WHICH ARE CONTINUING AT A RATE OF ONE TO TWO A WEEK (THERE ARE 24
                          PUMPS ON THE SYSTEM).
 12/77
101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM
                    93.0
97.0
90.0
95.0
94.0
71.0
92.0
26.0
67.0
96.0
98.0
95.0
90.0
91.9
73.0
67.0
71.0
70.0
53.0
69.0
20.0
50.0
72.0
74.0
71.0
67.0
68.8
                                                                             744   557
                                                                                   512  59.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          MODULE 107 REQUIRED EXTENSIVE MAINTENANCE ALONG WITH DOWNTIME FOR STRAINER
                          REPLACEMENT.

                          PUMP OVERHAULS AND REPLACEMENT OF CARBON STEEL STRAINERS WITH 316L SS
                          WERE PERFORMED ON MODULE 107 IN DECEMBER.
  1/78
  2/78
101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM

101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM
                               83.0
                               63.0
                               83.0
                               73.0
                               84.0
                               84.0
                               92.0
                               64.0
                               91.0
                               80.0
                               88.0
                               82.0
                    92.0
                    92.0
88.4

  .0
93.0
92.0
89.0
74.0
85.0
89.0
68.0
76.0
86.0
68.0
87.0
86.1
72.0
55.0
77.0
64.0
73.0
73.0
80.0
56.0
79.0
70.0
77.0
71.0
77.0

  .0
88.0
87.0
84.0
70.0
81.0
84.0
83.0
72.0
82.0
83.0
82.0
81.5
                                                                             744   648
                                                                                          573  68.0
                                                                             672   636
                                                                                          548   73.6
                                            13-818

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
NORTHERN STATES POWER: SHERBURNE 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABIHTY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
       *» PROBLEMS/SOLUTIONS/COMMENTS
                          MODULES WHICH ARE SHOWING OPERABILITY OF LESS THAN 80X, ARE THOSE IN
                          WHICH THE STRAINER MODIFICATIONS WERE PERFORMED.

                          A BULK ENTRAINMENT SEPARATOR HAS INSTALLED ALONG WITH A KOCH WASH TRAY
                          DURING THE PERIOD.

                          MODULE 101 WAS DOWN IN FEBRUARY FOR MODIFICATIONS TO THE SPRAY TOWER
                          ABSORBER.  MODIFICATIONS INCLUDED INSTALLATION OF A NEW PRE-MIST ELIMINA-
                          TOR  (KOCH WASH TRAY), NEW SPRAY NOZZLES AND REPLACEMENT OF TWO INCH
                          DIAMETER STAINLESS STEEL RODS WITH 6.625-INCH DIAMETER CERAMIC-COATED
                          CARBON STEEL RODS IN A MODULE PRIMARY CONTACTOR.
 3/78  101
       102
       103
       104
       105
       106
       107
       108
       109
       110
       111
       112
 4/78
SYSTEM

101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM
                    92.0
                    95.0
71.0
83.0
64.0
89.0
90.0
83.0
62.0
89.0
97.0
71.0
79.0
90.0
88.0

92.0
87.0
87.0
44.0
81.0
85.0
91.0
86.0
92.0
91.0
87.0
52.0
88.6
                                                65.0
                                                75.0
                                                58.0
                                                81.0
                                                82.0
                                                75.0
                                                56.0
                                                81.0
                                                88.0
                                                65.0
                                                72.0
                                                82.0
80.0

91.0
86.0
86.0
44.0
80.0
84.0
90.0
85.0
91.0
90.0
66.0
52.0
                                                                      744   676
                                                                                          595  76.9
                                                        87.7
                                                                             720   713
                                   632  87.2
        **  PROBLEMS/SOLUTIONS/COMMENTS
                           STRAINER  MODIFICATIONS WERE  PERFORMED ON MODULES  104 AND  112 WHICH
                           ACCOUNTED FOR  THE  LOW MODULE OPERABILITIES.
  5/78
        101
        102
        103
        104
        105
        106
        107
        108
        109
        110
        111
        112
        SYSTEM
            95.0
  6/78   101
61.0
86.0
85.0
86.0
89.0
64.0
62.0
83.0
82.0
71.0
87.0
79.0
85.0

50.0
52.0
73.0
73.0
73.0
76.0
55.
53.
71.
70.
61.0
74.0
67.0
72.6

50.0
                                                                      744   635
540  69.0
                                             13-819

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER'- SHERBURNE 1 (CONT. )
	_	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
102
103
10*
105
106
107
108
109
110
111
112
SYSTEM 93.0
84.0
65.0
85.0
62.0
78.0
55.0
83.0
88.0
82.0
72.0
95.0
83.6
84.0
84.0
84.0
62.0
78.0
55.0
83.0
87.0
82.0
72.0
94.0
83.2 720 717 599 77.8
  7/78   101
        102
        103
        104
        105
        106
        107
        108
        109
        110
        111
        112
        SYSTEM
95.0
82.0
76.0
71.0
74.0
75.0
52.0
75.0
63.0
62.0
72.0
66.0
73.0
76.5
76.0
71.0
66.0
69.0
70.0
49.0
70.0
59.0
58.0
67.0
62.0
68.0
71.4
                                                          744   694
                                                                       531  71.7
        ** PROBLEMS/SOLUTIONS/COMMENTS
  8/78  101
        102
        103
        104
        105
        106
        107
        103
        109
        110
        111
                           THE  OCCURRANCE OF  PLUGGING PROBLEMS IN THE MIST  ELIMINATOR HAS BEEN MORE
                           FREQUENT  THAN NORMAL.

                           THE  STRAINER MODIFICATIONS CONTINUED IN JUNE AND JULY.

                           THE  UTILITY IS EVALUATING NEW RUBBER LINED PUMPS (8000  GFM) TO HELP
                           CORRECT THE REHEATER AND MIST ELIMINATOR PLUGGING PROBLEMS.

                           THE  OCCURANCE OF PLUGGING PROBLEMS IN THE REHEATER HAS  BEEN MORE
                           FREQUENT  THAN NORMAL

                           THE  UTILITY IS PREPARING FOR THE STATE COMPLIANCE DEADLINE ON NOVEMBER  1,
                           1978.  CURRENTLY TESTING HAS BEEN PROCEEDING ON  DIFFERENT MODULES IN  AN
                           EFFORT TO FINE TUNE THE SYSTEM.

                           THE  FGD SYSTEM HAS BEEN EXPERIENCING PRIMARY CONTACTOR  WALL AND MARBLE  BED
                           WEAR.

                           THE  UTILITY IS EVALUATING NEW STAINLESS STEEL  MIST ELIMINATOR WASH
                           LANCES (REPLACING  THE  ORIGINAL FIBERGLASS LANCES) TO  HELP CORRECT THE
                           REHEATER  AND MIST  ELIMINATOR PLUGGING PROBLEMS.  THE  FIBERGLASS WASH
                           LANCES RUPTURE DURING  PRESSURE SURGES.
            64.0
            65.0
            73.0
            63.0
            65.0
            80.0
            81.0
            73.0
            63.0
            73.0
            64.0
                        64.0
                        65.0
                        73.0
                        63.0
                        65.0
                        79.0
                        80.0
                        73.0
                        63.0
                        72.0
                        64.0
                                             13-820

-------
                                                  UTILITY F60 SURVEY: OCTOBER 1983 - SEPTEMBER
NORTHERN STATES POWER: SHERBURNE 1 CCONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                502  PART. HOURS HOURS  HOURS FACTOR
       112
       SYSTEM

 9/78  101
       102
       103
       104
       105
       106
       107
       108
       109
       110
       111
       112
       SYSTEM
91.0
                    97.0
83.0
77.0

89.0
62.0
77.0
77.0
58.0
82.0
68.0
68.0
80.0
80.0
55.0
75.0
79.2
83.0
76.7

44.0
31.0
38.0
38.0
29.0
41.0
34.0
34.0
40.0
40.0
27.0
37.0
39.4
                                                          744   742
571  75.7
                                                                             720   357
                                                                       283  34.9
       ** PROBLEMS/SOLUTIOHS/COMMENTS
                           DIFFERENT MIST  ELIMINATOR SPRAY PATTERNS ARE BEING TESTED AS POSSIBLE
                           SOLUTION TO THE MIST  ELIMINATOR PLUGGING PROBLEM REFERRED TO IN JULY.

                           THE BOILER WAS  TAKEN  OFF LINE ON SEPTEMBER 15, 1978 FOR A SCHEDULED
                           ANNUAL  BOILER AND  TURBINE INSPECTION.  THE BOILER CAME BACK ON LINE IN
                           THE MIDDLE OF OCTOBER.

                           THE RUBBER LINED PUMPS THAT THE UTILITY WAS INVESTIGATING IN JULY, 1978
                           HAVE  BEEN ORDERED.  FOUR OF THE PUMPS HAVE BEEN RECEIVED AND ONE IS
                           INSTALLED.  THE OTHERS WILL BE INSTALLED AS THEY ARE RECEIVED.
 10/78   101
        102
        103
        104
        105
        106
        107
        108
        109
        110
        111
        112
        SYSTEM
92.0
            95.0
            65.0
            60.0
            17.0
            66.0
            88.0
            53.0
            72.0
            88.0
            70.0
            85.0
            73.0
            77.5
                        48.0
                        33.0
                        40.0
                         9.0
                        33.0
                        45.0
                        27.0
                        36.0
                        44.0
                        35.0
                        43.0
                        37.0
                        39.1
                      744   375
                                   291  35.6
        «* PROBLEMS/SOLUTIONS/COMMENTS
                           MODULES 104 AND  107 WERE  DOWN IN OCTOBER  AND  MODULE  110  WAS  DOWN  IN  OCTO-
                           BER AND NOVEMBER FOR THE  INSTALLATION OF  THE  NEW 8000  GPM SPRAY PUMPS
                           MENTIONED EARLIER.

                           THE BOILER AND SCRUBBER SHOWED LOW OPERATING  HOURS FOR OCTOBER BECAUSE
                           THE BOILER/TURBINE  OVERHAUL CONTINUED THROUGH THE FIRST  HALF OF OCTOBER.
 11/78   101
        102
        103
        104
        105
        106
        107
        108
        109
        110
            42.0
            51.0
            88.0
            81.0
            71.0
            78.0
            77.0
            63.0
            85.0
            61.0
                        42.0
                        51.0
                        87.0
                        80.0
                        70.0
                        77.0
                        76.0
                        63.0
                        84.0
                        61.0
                                             13-821

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: SHERBURNE I (CONT.)
_	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILEP  FGD   CAP.
                                                                502  PART. HOURS HOURS  HOURS FACTOR
       111
       112
       SYSTEM
            92.0
                        84.0
                        70.0
                        77.4
                        83.0
                        70.0
                        76.7
                      720   714
552  76.2
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          IN NOVEMBER MODULE 101 MAS DOWN (THE CONVERTED ROD SCRUBBER TEST MODULE)
                          FOR PUMP WORK AND INTERNAL HEADER CONVERSION.  THE MODULE IS BEING
                          PREPAIRED FOR FURTHER TESTING.
12/78
 1/79
101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM

101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM
77.0
73.0
77.0
73.0
86.0
87.0
93.0
85.0
93.0
86.0
90.0
88.0
                   94.0
                   94.0
91.6

72.0
39.0
76.0
95.0
73.0
95.0
81.0
89.0
96.0
92.0
83.0
93.0
89.5
76.0
72.0
76.0
72.0
85.0
86.0
91.0
84.0
91.0
85.0
89.0
87.0
90.4

66.0
36.6
70.0
88.0
68.0
88.0
75.0
82.0
89.0
85.0
77.0
86.0
82.7
                                                                             744   733
672  73.4
                                                                             744   688
                                                                                   615  63.2
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          THERE WERE PROBLEMS WITH THE COAL FEEDER BELTS RESULTING IN MOVING WET
                          COAL FROM OLDER COAL STOCKPILES TO THE BOILER DURING THE DECEMBER-JANUARY
                          PERIOD.

                          THE TESTING ON MODULE 101 HAS BEEN COMPLETED BUT NO RESULTS ARE YET
                          AVAILABLE.

                          THE PROBLEMS ENCOUNTERED WERE MAINLY WEATHER RELATED IN DECEMBER AND
                          JANUARY.
  2/79   101
        102
        103
        104
        105
        106
        107
        103
        109
        110
        111
        112
       SYSTEM
            89.0
78.0
73.0
70.0
76.0
50.0
91.0
92.0
92.0
75.0
77.0
66.0
93.0
64.8
78.0
73.0
70.0
76.0
50.0
88.0
92.0
92.0
75.0
77.0
66.0
93.0
84.8
                                                                             672   672
                                                                                   570  64.2
                                            13-822

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: SHERBURNE 1 (CONT.)
PERIOD MODULE AVAILABILITY
3/79 101
102
103
104
105
106
107
108
109
110
111
112
SYSTEM 92.0
OPER ABILITY
61.0
68.0
45.0
86.0
94.0
71.0
91.0
73.0
91.0
80.0
89.0
80.0
86.3
RELIABILITY UTILIZATION
60.0
87.0
44.0
85.0
93.0
70.0
90.0
72.0
90.0
79.0
88.0
79.0
85.2
X REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR












744 734 634 56.2
       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE ONLY MAJOR  PROBLEMS REPORTED BY THE UTILITY DURING FEBRUARY AND MARCH
                         WERE BOILER RELATED-SPECIFICALLY PROBLEMS WITH WET COAL.

                         CURRENTLY THE UTILITY  IS  INCREASING THE RECYCLE PUMP CAPACITY BY INSTAL-
                         LING 8000 GPM WORTHINGTON RECYCLE PUMPS.  DURING THIS PERIOD THEY HAVE
                         BEEN INSTALLED  ON MODULES 101,103.104,105,107, AND 110.

 4/79  SYSTEM       93.0                                                      720   622         64.7

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         AS OF NOVEMBER  1979 THE UTILITY DECIDED THAT IT WILL NO LONGER REPORT
                         MODULAR INFORMATION.

 5/79  SYSTEM       98.0                                                      744   678         70.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO  FGD SYSTEM PROBLEMS OCCURRED DURING APRIL OR
                         MAY.

 6/79  SYSTEM       93.0                                                      720   701         70.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT SOME GENERAL PLUGGING WAS EXPERIENCED DURING
                         JUNE BUT  IT WAS NOT SERIOUS.

 7/79  SYSTEM       93.0                                                      744   695         72.0

 8/79  SYSTEM       95.0                                                      744   744         74.4

 9/79  SYSTEM       92.0                                                      720   166         17.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         ON SEPTEMBER 8  THE UNIT WENT  DOWN FOR THE ANNUAL BOILER/TURBINE INSPECTION
                         AND IS  EXPECTED TO BE  OFF LINE UNTIL THE  LAST  WEEK OF OCTOBER.

 10/79  SYSTEM       77.0                                                      744      9

 11/79  SYSTEM       97.0                                                      720   522         58.6

 12/79  SYSTEM       95.0                                                      744   744         82.3
                                             13-823

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: SHERBURNE 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER  BOILER   FGD    CAP.
                                                                SOS   PART. HOURS HOURS   HOURS  FACTOR
       **  PROBLEMS/SOLUTIONS/COMMENTS
                         THE UNIT WAS SUPPOSED TO BE BACK ON LINE IN OCTOBER AFTER THE  ANNUAL
                         BOILER/TURBINE INSPECTION, BUT CONTAMINANTS IN THE MAIN TURBINE  OIL MADE
                         IT NECESSARY TO CONTINUE THE OUTAGE UNTIL THE SECOND WEEK OF NOVEMBER.

                         PRESENTLY THE UTILITY IS SELECTIVELY REMOVING MARBLE BEDS FROM SERVICE
                         TO TEST THE FEASIBILITY OF CONVERTING THE FGD MODULES TO SPRAY TOWERS.
  1/80

  2/80

  3/80
       SYSTEM

       SYSTEM

       SYSTEM
      ALL PIPING HAS BEEN CONVERTED  FROM CARBON STEEL TO FIBERGLASS.

97.0                                                      744   743

97.0                                                      696   687

98.0                                                      744   688
                  90.8

                  66.2

                  84.1
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          DURING  THE  FIRST QUARTER OF 1980 NO MAJOR PROBLEMS WERE  ENCOUNTERED WITH
                          THE  FGD SYSTEM.

                          FROM MID-SEPTEMBER TO MID-OCTOBER THE UTILITY HAS SCHEDULED A BOILER
                          OUTAGE  AT WHICH TIME THE MARBLE BEDS WILL BE INSPECTED.

                          THE  UTILITY HAS DECIDED TO CONVERT THE ENTIRE MARBLE BED SCRUBBING SYSTEM
                          TO A SPRAY  TOWER SYSTEM BY REMOVING THE MARBLE BEDS AND  MODIFYING THE  SPRAY
                          ARRANGEMENT.   TESTS CONDUCTED IN 1978 AND 1979 SHOW THAT MOST OF THE 502
                          IS COLLECTED  IN THE VENTURI SECTION OF THE SCRUBBING TRAINS AND THAT
                          ALTHOUGH THE  MARBLE BEDS IN THE ABSORBER SECTIONS IMPROVE  INTIMATE S02/
                          SLURRY  MIXING, S02 REMOVAL EFFICIENCY OF THE SCRUBBING TRAINS IS NOT
                          MARKEDLY DIFFERENT WHEN MARBLE BEDS ARE REMOVED.
  4/80

  5/80

  6/80
       SYSTEM

       SYSTEM

       SYSTEM
97.0

96.0

96.0
720

744

720
720

720

697
79.4

78.1

74.7
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          NO MAJOR  OPERATIONAL  PROBLEMS WERE REPORTED DURING THE  SECOND  QUARTER
                          OF 1980.
                                                                                           744   82.1
                                                                                           738   69.1
 7/80  SYSTEM     100.0       100.0       100.0       100.0                  744   744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO OPERATIONAL PROBLEMS WERE ENCOUNTERED IN JULY.

 8/80  SYSTEM     100.0       100.0       100.0        99.2                  744   733

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THERE WERE TWO SHORT TERM OUTAGES IN JULY DUE TO BOILER RELATED TRIPS.

 9/80  SYSTEM     100.0       100.0       100.0        99.6                  720   717    717  76.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A BOILER RELATED PROBLEM CAUSED THE ONLY OUTAGE TIME IN SEPTEMBER.

10/80  SYSTEM     100.0                   100.0        71.9                  744   535    535  57.7
                                             13-824

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: SHERBURNE 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


11/80  SYSTEM     100.0           .0                      .0                  720     0      0    .0

12/80  SYSTEM     100.0       100.0       100.0        61.0                  744   603    603  51.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE OCTOBER-DECEMBER PERIOD THE UNIT WAS SHUTDOWN FOR THE ANNUAL
                         BOILER/TURBINE INSPECTION.  THE OUTAGE EXTENDED LONGER THAN EXPECTED
                         DUE TO SOME BOILER TUBE LEAKS.

                         DURING THE ANNUAL BOILER/TURBINE INSPECTION GENERAL MAINTENANCE WAS PER-
                         FORMED ON THE SCRUBBING SYSTEM.  THE MAINTENANCE INCLUDED THE OVERHAUL
                         OF THE SPRAY PUMPS AND THE REBUILDING OF THE PC RODS.

                                                                             744   744    744  73.2

                                                                             672   640    640  71.2

                                                                             744   744    744  78.3

       *« PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FIRST QUARTER 1981 THE UTILITY REPORTED THAT NO MAJOR FGD-RELAT-
                         ED PROBLEMS WERE ENCOUNTERED.

                         WORK IS  CONTINUING ON CONVERTING THE MARBLE BED SCRUBBING SYSTEM TO A SPRAY
                         TOWER SYSTEM.  FIVE OF THE TWELVE ABSORBERS ARE COMPLETED.
1/81 SYSTEM
2/81 SYSTEM
3/81 SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
95.0
100.0
4/81
5/81
6/81
SYSTEM
SYSTEM
SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.
100.
100.
0
0
0
100.
81.
87.
0
0
0
720
744
720
719
608
632
719
608
632
80.0
62.0
62.0
*« PROBLEMS/SOLUTIONS/COMMENTS
DURING THE SECOND QUARTER THE
AS A RESULT OF A BOILER TUBE
7/81
8/81
9/81
SYSTEM
SYSTEM
SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.
100.
100.
0
0
0
FGO
LEAK
91.
100.
100.
SYSTEM
0
0
0
MAS OUT OF SERVICE A FEW HOURS
744
744
720
678
744
720
678
744
720
65.0
69.0
71.0
** PROBLEMS/SOLUTIONS/COMMENTS

10/81
11/81
12/81

SYSTEM
SYSTEM
SYSTEM

100.0
100.0
100.0
THE FGD SYSTEM
AS A RESULT OF
100.0
100.0
100.0
WAS TAKEN OUT OF SERVICE
BOILER TUBE LEAKS.
100.
100.
100.
0
0
0
92.
95.
100.
0
0
0
TWICE DURING THE
744
720
744
THIRD
690
686
744
QUARTER
690
686
744
71.0
69.0
79.0
       **  PROBLEMS/SOLUTIONS/COMMENTS

                          BOILER  TUBE LEAKS  CONTINUED  TO  BE  A  PROBLEM  DURING  THE  FOURTH  QUARTER.

                          THE  FGD SYSTEM  WAS OUT  OF  SERVICE  FOR  A  SHORT  PERIOD  SO THAT THE  BOILER
                          AIR  PREHEATER COULD BE  CLEANED.

 1/82  SYSTEM      100.0        100.0       100.0        99.2                 744   738     738  88.2
                                             13-825

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER

NORTHERN STATES POWER: SHERBURNE 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD    CAP.
                                                                S02   PART. HOURS  HOURS   HOURS  FACTOR


 2/82  SYSTEM     100.0       100.0       100.0        96.4                  672    6*8     6*8   8*.3

 3/82  SYSTEM     100.0       100.0       100.0        91.9                  7**    68*     68*   72.2

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-REUTED PROBLEMS  WERE ENCOUNTERED
                         DURING THE FIRST QUARTER 1982.

 */82  SYSTEM                                                                720

 5/82  SYSTEM                                                                7**

 6/82  SYSTEM                                                                720

 7/82  SYSTEM                                                                7**

 8/82  SYSTEM                                                                7**

 9/82  SYSTEM                                                                720

 10/82  SYSTEM                                                                7**

 11/82  SYSTEM                                                                720

 12/82  SYSTEM                                                                7**

 1/83  SYSTEM                                                                744

 2/83  SYSTEM                                                                672

 3/83  SYSTEM                             '                                   744.

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE PERIOD OF APRIL 1982 TO MARCH 1983.

 */83  SYSTEM                                                                720

 5/83  SYSTEM                                                                744

 6/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE PERIOD OF APRIL 1982 THROUGH  JUNE  1983.

 7/83  SYSTEM                                                                744

 8/83  SYSTEM                                                                744

 9/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE THIRD QUARTER OF 1983.

 10/83  SYSTEM

 11/83  SYSTEM                                                                720

 12/83  SYSTEM

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

NORTHERN STATES POWER: SHERBURNE 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS NOT AVAILABLE FOR THE FOURTH QUARTER OF 1983.

 1/84  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE FIRST THREE QUARTERS OF 1984.
                                             13-827

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

  ** UNIT DATA  - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE  GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

  ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH  CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

«** PARTICLE CONTROL

  ** MECHANICAL COLLECTOR
     NUMBER
     TYPE

  »* ESP
     NUMBER
     TYPE

  ** PARTICLE SCRUBBER
     NUMBER
     NUMBER OF SPARES
     INITIAL START-UP DATE
     GENERIC TYPE
     SPECIFIC  TYPE
     TRADE NAME/COMMON NAME
     SUPPLIER
     DIMENSIONS  - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE -  LITER/S
     L/G RATIO -  LITER/CU.M
     PRESSURE  DROP - KPA
     SUPERFICIAL  GAS VELOCITY - M/S
     INLET GAS FLOW RATE - CU.M/S
NORTHERN STATES POWER
SHERBURNE
Z
BECKER
MINNESOTA
C
   37.         (  .087 LB/MMBTU)
  413.         (  .960 LB/MMBTU)
******         (****** LB/MMBTU)
 1420
  750
  710
  740
  750
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
 1349.16       (2859000 ACFM)
  154.4        ( 310 F)
  198.         ( 650 FT)
CONCRETE
    9.9        ( 32.6 FT)
               (   8400 BTU/LB)
                8300-8500
COAL
SUBBITUMINOUS
19538.

    9.00
******
   25.00
******
     .80
******
     .03
******
 0
NONE
 0
NONE
12
 2
 4/77
VENTURI TOWER
VARIABLE-THROAT/VERTICALLY-AOJUSTABLE ROD DECKS
ROD SCRUBBER
COMBUSTION ENGINEERING
3.0 X 25.5
STAINLESS STEEL
AUSTENITIC
NONE
N/A
TYPE 304 STAINLESS STEEL RODS
 2
  223.0        ( 3540 GPM)
    1.8        (13.6 GAL/1000ACF)
    3.5        (14.0 IN-H20)
   24.4        (   80.0 FT/S)
  122.6        ( 259900 ACFM)
                                             13-828

-------
                                                  UTILITY F6D SURVEY:  OCTOBER 1983 - SEPTEMBER
NORTHERN STATES POWER: SHERBURNE Z (CONT.)

     INLET GAS TEMPERATURE - C
     PARTICLE REMOVAL EFFICIENCY - X

*«* FGD SYSTEM

 »* GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X
     DESIGN COAL HEAT CONTENT - J/G
     DESIGN COAL ASH CONTENT - X
     DESIGN MOISTURE CONTENT - X
     SPACE REQUIREMENTS - SQ M
     OPER. t MAINT. REQUIREMENT - MANHR/DAY

 ** QUENCHER/PRESATURATOR
     NUMBER

 »* ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X
     PARTICLE REMOVAL EFFICENCY - X

 «* MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     FREEBOARD DISTANCE - M
     DISTANCE BETWEEN STAGES - CM
     154.4
      99.0
(   310 F)
   THROWAWAY PRODUCT
   MET SCRUBBING
   LIMESTONE/ALKALINE FLYASH
   NONE
   COMBUSTION ENGINEERING
   BLACK ft VEATCH
   FULL SCALE
   NEW
- X   99.00
      50.00
       4.0
    1
    4/77
    3/77
    0/71
        .70
   19305.8
       9.00
      28.00
    1312.0
     212.0
(   8300 BTU/LB)


(   14123 SQ FT)
   12
    2
   SPRAY TOWER
   OPEN COUNTERCURRENT SPRAY
   N/A
   COMBUSTION ENGINEERING
   18 X 26.5 X 60
   CARBON STEEL
   AISI 1110
   N/A
   ORGANIC
   GLASS FLAKE-FILLED POLYESTER
   FLAKELINE 151
   NONE
     378.
       2.9
       1.5
       3.0
     129.77
      54.4
      50.0
      99.0
(  6000 GPM)
(  21.8 GAL/1000 ACF)
(  6.0 IN-H20)
(  10.0 FT/S)
(  275000 ACFM)
(   130 F)
   PRIMARY COLLECTOR
   12
    2
    1
   IMPINGEMENT
   BAFFLE
   CLOSED VANE
   HORIZONTAL
       2
       3
       3.20
      25.40
(10.5 FT)
(10.0 IN)
                                            13-829

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984
NORTHERN STATES POWER: SHERBURNE Z (CONT.)

     DISTANCE BETWEEN VANES - CM
     PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH FREQUENCY
     WASH RATE - L/S

  ** REHEATER
     NUMBER
     NUMBER OF SPARES
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     LOCATION
     TEMPERATURE INCREASE - C
     INLET FLUE GAS FLOW RATE - CU. M/S
     INLET FLUE GAS TEMPERATURE - C
     OUTLET FLUE GAS TEMPERATURE - C
     NUMBER OF HEAT EXCHANGER BANKS
     NUMBER OF TUBES PER BUNDLE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

  »*  FANS
     NUMBER
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS  FLOW RATE - CU.M/S
     FLUE GAS  TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

  **  DAMPERS
     GENERIC TYPE
     SPECIFIC  TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

  «*  DAMPERS
     GENERIC TYPE
     SPECIFIC  TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

  **  DAMPERS
     GENERIC TYPE
     SPECIFIC  TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

  **  DUCTWORK
      LOCATION
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

  **  DUCTWORK
     LOCATION
       SHELL GENERIC MATERIAL TYPE
                 4.00 IN)
                  .5 IN-H20)
                 10.0 FT/S)
   10.2
     .1
    3.0
ORGANIC
FIBER-REINFORCED POLYESTER
MAKE-UP WATER
ONCE PER 24 HRS
  126.2        ( 2000 GAL/MIN)
12
 2
 1
IN-LINE
HOT WATER
FIN TUBE
10 FT ABOVE ME
   22.2
   94.38
   54.4
     .7
                   40 F)
                 200000 ACFM)
                  130 F)
                  170 F)
               (  200000 ACFM)
               (   170 F)
   76.
   4
  45
CARBON STEEL
AISI 1110
CENTRIFUGAL
GREEN FAN
UNIT
INDUCED DRAFT
DRY
   94.38
   76.7
CARBON STEEL
BUTTERFLY
N/A
CARBON STEEL
AISI 1110
NONE
N/A
BUTTERFLY
N/A
CARBON STEEL
AISI 1110
NONE
N/A
LOUVER
PARALLEL BLADE MULTILOUVER
CARBON STEEL
AISI 1110
NONE
N/A
SCRUBBER INLET
CARBON STEEL
AISI 1110
NOME
N/A
REHEATER TO STACK
CARBON STEEL
                                             13-830

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
NORTHERN STATES POWER: SHERBURNE Z (CONT.)

      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER
     NUMBER OF SPARES
     FULL LOAD DRY FEED CAPACITY - M.TONS/HR
     PRODUCT QUALITY - X SOLIDS

 »* TANKS
     SERVICE
     ABSORBER RECYCLE
     MAKEUP WATER
     REAGENT PREP PRODUCT

 ** PUMPS
     SERVICE
     POND RETURN
     THICKENER UNDERFLOW
     MAKEUP WATER
     REHEAT WATER
     SCRUBBER RECIRCULATION
     ABSORBER RECIRCULATION
     LIMESTONE CLASSIFIER RECYCLE
     LIMESTONE DILUTION
     LIMESTONE SLURRY TRANSFER

 «* SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

 *** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT
     SITE DIMENSIONS
     SITE CAPACITY - CU.M

 ** PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     PHYSICAL VARIABLES
     CONTROL LEVELS
AISI 1110
NONE
N/A
MET BALL MILL
COMPARTMENTED
NR
ALLIS CHALMERS
 1
 0
   21.8
   65.0
                                                NUMBER
   TPH)
  12
   1
NUMBER

   1
   1
   1
   2
   2
  12
*«**
«***
****
THICKENER
 2
1
160.0 DIA X 10.0
CARBON STEEL
AISI 1110
NONE
N/A
ABSORBER BLEED
10X SOLIDS
28X SOLIDS
POND
LIMESTONE SLURRY TRANSFER TANK
FORCED OXIDATION
REACTION TANK
N/A
FINAL
POHO
ON-SITE
PIPELINE
CLAY LINING
62 ACRES X 50 FT
   3791300     (
3100.0 ACRE-FT)
SLURRY PH, S02
PRESSURE DROP, PERCENT SOLIDS, TANK LEVELS
PRESSURE DROP 12 IN H20, 10X SOLIDS, PH=5-5.5
                                            13-831

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: SHERBURNE 2 (CONT.)
     MONITOR TYPE
     MONITOR LOCATION
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE

 ** WATER BALANCE
     WATER LOOP TYPE
     RECEIVING WATER STREAM
     SOURCE OF MAKEUP WATER

 ** CHEMICALS AND CONSUMPTION
     FUNCTION
     NAME
     PRINCIPAL CONSTITUENT
     CONSUMPTION
     POINT OF ADDITION

 «* FGD SPARE CAPACITY INDICES
     ABSORBER - X

 ** FGD SPARE COMPONENT INDICES
     ABSORBER
                             DUPONT [S021
                             BOILER OUTLET
                             AUTOMATIC
                             FEEDBACK
                             t ON MODULES IS02J
                             OPEN
                             MISSISSIPPI  RIVER
                             RIVER  MATER  &  COOLING TOWER SLOWDOWN
                             ABSORBENT
                             LIMESTONE
                             95X CAC03
                             3.0-3.5  TPH
                             BALL MILL
                                 9.0
                                                    1.0
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                             •/. REMOVAL
                                             S02   PART.
                                           PER  BOILER  FGO   CAP.
                                          HOURS HOURS  HOURS FACTOR
 4/77   201
        202
        203
        204
        205
        206
        207
        208
        209
        210
        211
        212
        SYSTEM

 5/77   201
        202
        203
        204
        205
        206
        207
        208
        209
        210
        211
        212
        SYSTEM
92.0
                    91.0
              .0
            95.0
            93.3
            87.4
            82.6
            83.8
            93.7
            73.
            90.
.9
.5
            86.8
            84,
            85.
            87.0

            32.9
           100.0
            44.4
            94.6
            93.9
           100.0
            75.9
            98.0
            93.9
            92.2
            91.2
            97.8
            92.3
        **  PROBLEMS/SOLUTIONS/COMMENTS
.0
.9
.3
.6
.0
.1
.7
.5
91.
90.
84.
60.
81.
90.
71.
87.6
84.0
81.9
82.8
84.2

28.5
86.6
38.4
81.9
81.3
86.6
65.7
84.8
81.3
79.8
78.9
84.7
79.9
                              57.50  99.00   720   697
                                 590  83.0
                                                                             744   644
                                                                                          594   76.5
                          THE FGD SYSTEM BEGAN OPERATIONS IN APRIL 1977.  ONLY MINOR  PROBLEMS
                          OCCURRED DURING APRIL AND MAY.  THE SYSTEM IS CURRENTLY  IN  A  SHAKEDOWN
                          PHASE OF OPERATION.
 6/77   201
        202
        203
        204
        205
        206
            92.0
            76.0
            78.0
            79.0
            89.0
            74.0
                      92.0
                      76.0
                      78.0
                      79.0
                      89.0
                      74.0
                                            13-832

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
NORTHERN STATES POWER: SHERBURNE 2 (CONT.)
PERIOD MODULE AVAILABILITY
207
208
209
210
211
212
SYSTEM 96.0
OPERABILITY
67.0
88.0
88.0
78.0
45.0
85.0
85.4
RELIABILITY UTILIZATION
67.0
68.0
88.0
78.0
45.0
85.0
85.4
X REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR






720 720 615 79.5
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          CRACKING AND BUBBLING OF THE CEILCOTE LINING HAS BEEN OBSERVED ABOVE THE
                          LIQUID LEVEL OF THE INTERNAL RECYCLE TANK.
 7/77
 8/77
201
202
203
204
205
206
207
208
209
210
211
212
SYSTEM

201
202
203
204
205
206
207
208
209
210
211
212
SYSTEM
                   97.0
                   93.0
96.0
87.0
86.0
97.0
96.0
88.0
88.0
95.0
57.0
93.0
94.0
87.0
96.7

88.0
75.0
67.0
82.0
64.0
35.0
81.0
80.0
56.0
79.0
71.0
33.0
75.6
78.0
70.0
70.0
79.0
78.0
71.0
71.0
77.0
46.0
75.0
76.0
70.0
78.3

80.0
68.0
61.0
74.0
76.0
32.0
74.0
73.0
51.0
72.0
64.0
30.0
68.6
                                                                             744   602
                                                                                          531  69.6
                                                                             744   675
                                                                                          510  66.6
       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  SPRAY PUMPS MERE OVERHAULED DURING AUGUST ON MODULES 206 AND 209.
                         THE SPRAY NOZZLES ON MODULES 206 AND 209 REQUIRED EXTENSIVE CLEANING.
  9/77
       201
       202
       203
       204
       205
       206
       207
       208
       209
       210
       211
       212
       SYSTEM
            94.0
                        89.0
                        61.0
                        82.0
                        90.0
                        81.0
                        86.0
                        52.0
                        68.0
                        56.0
                        87.0
                        73.0
                        86.0
                        84.6
                        89.0
                        61.0
                        82.0
                        90.0
                        81.0
                        66.0
                        52.0
                        88.0
                        56.0
                        87.0
                        73.0
                        66.0
                        64.6
                                              720   717
                                                           609  79.4
                                            13-833

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: SHERBURNE 2 (CONT.)
	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                                         7. REMOVAL   PER  BOILER  FGD   CAP.
                                                         S02  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE STRAINERS IN THE MODULE 207 AND 209 REACTION TANKS HAVE STARTED
                          ERODING.  THE UTILITY ANTICIPATES REPLACING THEM VERY SOON.
10/77
       201
       202
       203
       204
       205
       206
       207
       203
       209
       210
       211
       212
       SYSTEM
                   95.0
                        98.0
                        89.0
                        87.0
                        86.0
                        62.0
                        99.0
                        98.0
                        93.0
                        96.0
                        96.0
                        70.0
                        81.0
                        95.9
                        90.0
                        82.0
                        80.0
                        79.0
                        57.0
                        91.0
                        90.0
                        86.0
                        88.0
                        88.0
                        64.0
                        75.0
                        88.2
                                                                                   684
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE LOW OPERABILITIES ARE DUE TO SPRAY WATER PUMP OVERHAULS.
                          ARE BEING OVERHAULED.
                                                                                          656  81.6
                                                                                 24 PUMPS
                          STRAINER/WASHER SCREEN EROSION HAS BEEN A PROBLEM.  316 SS MATERIAL WILL
                          BE USED IN THE FUTURE.  REPLACEMENT MATERIAL IS EXPECTED TO ARRIVE IN
                          DECEMBER AND WORK IS EXPECTED TO LAST FOR THREE MONTHS.
 11/77
 12/77
201
202
203
204
205
2TJ6
207
208
209
210
211
212
SYSTEM

201
202
203
204
205
206
207
208
209
210
211
212
SYSTEM
                   91.0
85.0
93.0
68.0
80.0
93.0
73.0
75.0
66.0
94.0
77.0
91.0
65.0
87.3

53.0
93.0
94.0
87.0
89.0
95.0
93.0
83.0
62.0
82.0
90.0
                   93.0
92.
92.
 1/78  201
       202
       203
       204
       205
       206
                        91.0
                        75.0
                        64.0
                        72.0
                        74.0
                        67.0
84.0
92.0
68.0
79.0
92.0
73.0
75.0
66.0
93.0
77.0
90.0
65.0
86.7

52.0
92.0
93.0
86.0
88.0
94.0
92.0
82.0
61.0
81.0
89.0
91.0
91.0

83.0
69.0
59.0
66.0
68.0
61.0
                                                                             720   715
                                                                                          624  81.7
                                                                             744   733
                                                                                          677  80.6
                                            13-834

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
NORTHERN STATES POWER: SHERBURNE Z (CONT.)
PERIOD MODULE AVAILABILITY
207
208
209
210
211
212
SYSTEM 92.0
OPERABILITY
91.0
68.0
77.0
72.0
73.0
84.0
84.4
RELIABILITY UTILIZATION
83.0
81.0
71.0
66.0
70.0
77.0
77.6
X REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR






744 682 577 70.3
       «* PROBLEMS/SOLUTIONS/COMMENTS
                          THE REPLACEMENT OF STRAINER SCREENS BEGAN ON DECEMBER 21.  FOUR TO SIX
                          DAYS OF WORK ON EACH MODULE ARE REQUIRED TO MAKE STRAINER SCREEN
                          REPLACEMENTS.
  2/78
201
202
203
204
205
206
207
208
209
210
211
212
SYSTEM
                    92.0
83.
85.
55.
91.
89.0
76.0
71.0
89.0
85.0
81.0
97.0
60.0
87.4
77.0
78.0
51.0
84.0
62.0
70.0
66.0
82.0
78.0
75.0
90.0
55.0
80.7
                                                                             672   620
542  73.8
        ** PROBLEMS/SOLUTIONS/COMMENTS
                           STRAINER  MODIFICATIONS  WERE  PERFORMED ON MODULES  203 AND 212.
  3/78
        201
        202
        203
        204
        205
        206
        207
        208
        209
        210
        211
        212
        SYSTEM
            97.0
                        82.0
                        92.0
                        90.0
                        83.0
                        78.0
                        85.0
                        91.0
                        62.0
                        83.0
                        78.0
                        88.0
                        89.0
                        91.0
                        82.0
                        92.0
                        90.0
                        83.0
                        78.0
                        85.0
                        91.0
                        62.0
                        83.0
                        78.0
                        88.0
                        89.0
                        91.0
                      744   744
677  87.9
        ** PROBLEMS/SOLUTIONS/COMMENTS
                           THE UNIT GENERATED MAXIMUM MEGAWATT-HOURS AND  THE  FGD  SYSTEM TIED  THE
                           HIGHEST RECORDED AVAILABILITY OF  97X.

                           STRAINER MODIFICATIONS WERE PERFORMED  ON MODULES 208 AND  210.
  4/78  201
        202
        203
        204
        205
        206
        207
        208
        209
        210
                        70.0
                        62.0
                        90.0
                        84.0
                        91.0
                        83.0
                        84.0
                        66.0
                        78.0
                        90.0
                        70.0
                        62.0
                        90.0
                        84.0
                        91.0
                        63.0
                        84.0
                        86.0
                        78.0
                        90.0
                                             13-835

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER; SHERBURNE 2 (CONT.)
	,	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                                         •/. REMOVAL   PER  BOILER  FGD   CAP.
                                                         502  PART. HOURS HOURS  HOURS FACTOR
       211
       212
       SYSTEM
                   92.0
                        67.0
                        85.0
                        90.0
                        67.0
                        85.0
                        90.0
                      720   719
648  81.9
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          FROM FULL SCALE STARTUP ON APRIL 1» THE SYSTEM HAS BEEN OPERATING VERY
                          WELL WITH NO MAJOR PROBLEMS ENCOUNTERED.  THE UTILITY IS MAINTAINING A
                          SCHEDULE OF NIGHTLY CLEANING ON THE SCRUBBERS.  THE CURRENT SCHEME IS SUCH
                          THAT EACH MODULE IS CLEANED AFTER SEVEN OR EIGHT DAYS OF OPERATION.

                          MODULE 201 WAS CONVERTED TO A SPRAY TOWER DURING APRIL.
 5/78
201
202
203
204
205
206
207
208
209
210
211
212
SYSTEM
                    91.0
97.0
94.0
80.0
90.0
90.0
89.0
90.0
92.0
28.0
91.0
78.0
14.0
84.8
16.0
15.0
13.0
15.0
15.0
14.0
15.0
15.0
 5.0
15.0
13.0
 2.0
13.9
                                                                             744   120
                                                                                          103  12.7
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          THERE WERE LINER FAILURES (CEILCOTE) IN MOST OF THE MODULES DURING APRIL
                          AND MAY.  THE LINERS WERE REPAIRED BY THE CEILCOTE COMPANY AT THEIR OWN
                          EXPENSE.

                          THE UNIT WENT DOWN ON-MAY 6 FOR THE FIRST YEAR BOILER AND TURBINE INSPEC-
                          TION AND WAS DOWN THE REMAINDER OF MAY.
  6/78
  7/78
201
202
203
204
205
206
207
203
209
210
211
212
SYSTEM

201
202
203
204
205
206
207
208
209
210
211
212
SYSTEM
                    95.0
                   95.0
77.0
46.0
41.0
67.0
62.0
62.0
72.0
78.0
60.0
62.0
76.0
75.0
70.7

87.0
89.0
62.0
93.0
90.0
64.0
86.0
67.0
64.0
81.0
73.0
71.0
84.3
61.0
37.0
33.0
53.0
49.0
49.0
57.0
62.0
48.0
49.0
60.0
60.0
56.2

82.0
63.0
58.0
87.0
84.0
60.0
81.0
63.0
60.0
76.0
68.0
67.0
79.0
                                                                             720   572
                                                                                          405  61.3
                                                                             744   697
                                                                                          588  71.5
                                            13-836

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
NORTHERN STATES POWER: SHERBURNE 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  F6D   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE UTILITY IS EVALUATING NEW RUBBER LINED PUMPS (8000 GPM) AS POSSIBLE
                          SOLUTIONS TO THE MIST ELIMINATOR AND REHEATER PLUGGING PROBLEMS.

                          THE UTILITY IS EVALUATING NEW STAINLESS STEEL MIST ELIMINATOR WASH LANCES
                          (TO REPLACE ORIGINAL FIBERGLASS LANCES).

                          THE FGD SYSTEM HAS BEEN EXPERIENCING PRIMARY CONTACTOR WALL AND MARBLE
                          BED WEAR.

                          THE UTILITY IS PREPARING FOR THE STATE COMPLIANCE DEADLINE ON NOVEMBER 1.
                          CURRENTLY TESTING HAS BEEN PROCEEDING ON DIFFERENT MODULES IN AN EFFORT
                          TO FINE TUNE THE SYSTEM.

                          PLUGGING PROBLEMS IN THE REHEATER HAVE BEEN MORE FREQUENT THAN NORMAL.

                          THE UTILITY IS IN THE PROCESS OF REPLACING THE ORIGINAL ZURN DUPLEX
                          STRAINERS WITH 316 SS STRAINERS.

                          THE INLET SEAL STRIPS WERE REPAIRED.

                          PLUGGING PROBLEMS IN THE MIST ELIMINATOR HAVE BEEN MORE FREQUENT THAN
                          NORMAL.
  8/78   201
        202
        203
        204
        205
        206
        207
        208
        209
        210
        211
        212
  9/78
SYSTEM

201
202
203
204
205
206
207
208
209
210
211
212
SYSTEM
                    93.0
                    96.0
 88.0
100.0
 48.0
 79.0
 81.0
 72.0
 64.0
 87.0
 54.0
 76.0
 80.0
 71.0
 81.8

 72.0
 82.0
 70.0
 61.0
 74.0
 64.0
 82.0
 72.0
 75.0
 78.0
 82.0
 68.0
 80.0
                                                82.0
                                                93.0
                                                45.0
                                                74.0
                                                76.0
                                                67.0
                                                60.0
                                                81.0
                                                50.0
                                                71.0
                                                75.0
                                                66.0
                                                76.4
                                                                             744   695
                                   569  69.8
72.0
82.0
70.0
61.0
74.0
64.0
82.0
72.0
75.0
78.0
82.0
68.0
80.0
                                                                              720    720
576  74.4
        **  PROBLEMS/SOLUTIONS/COMMENTS
                           THE  RUBBER  LINED  PUMPS THAT THE  UTILITY  WAS  INVESTIGATING HAVE  BEEN
                           ORDERED.  FOUR  OF THE  PUMPS HAVE BEEN RECEIVED  AND  ONE  IS INSTALLED.   THE
                           OTHERS WILL BE  INSTALLED  AS THEY ARE  RECEIVED.

                           DIFFERENT MIST  ELIMINATOR SPRAY  PATTERNS ARE BEING  TESTED TO MINIMIZE
                           PLUGGING  OCCURRENCES.

                           NO FGD RELATED  OUTAGES WERE REPORTED  BY  THE  UTILITY FOR THE AUGUST-
                                             13-837

-------
UTILITY FED SURVEY? OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: SHERBURNE 2 (CONT.)
PERIOD MODULE

10/78 201
202
203
204
205
206
207
208
209
210
211
212
SYSTEM
AVAILABILITY OPERABILITY RELIABILITY
SEPTEMBER REPORT PERIOD.
90.0
79.0
59.0
73.0
69.0
64.0
78.0
76.0
72.0
69.0
72.0
82.0
94.0 80.3
UTILIZATION

83.0
73.0
55.0
68.0
64.0
59.0
72.0
70.0
67.0
64.0
67.0
76.0
74.4
X REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR













744 688 553 68.8
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          DURING OCTOBER. MODULE  203  EXPERIENCED STRAINER  PLUGGING.

                          DURING OCTOBER MODULE  203  EXPERIENCED REHEATER  PROBLEMS WHICH  TOGETHER
                          WITH STRAINER PLUGGING CAUSED A FOUR TO  FIVE DAY OUTAGE.
 11/78   201
        202
        203
        204
        205
        206
        207
        208
        209
        210
        211
        212
        SYSTEM
                    92.0
            84.0
            45.0
            82.0
            80.0
            75.0
            58.0
            77.0
            75.0
            83.0
            83.0
            72.0
            47.0-
            78.3
                        55.0
                        30.0
                        54.0
                        52.0
                        49.0
                        38.0
                        51.0
                        49.0
                        54.0
                        54.0
                        47.0
                        31.0
                        51.3
                                                                              720    472
                                                                                           369   44.6
        ** PROBLEMS/SOLUTIONS/COMMENTS
                           LOW  NOVEMBER  BOILER HOURS RESULTED  FROM A NECESSARY  TURBINE  INSPECTION.

                           NORMAL  OVERHAUL MAINTENANCE WAS  PERFORMED ON THE  SPRAY  PUMPS OF  MODULES
                           202  AND 212.
 12/78  201
        202
        203
        204
        205
        206
        207
        208
        209
        210
        211
        212
        SYSTEM

  1/79  201
        202
        203
        204
        205
94.0
85.0
92.0
89.0
84.0
64.0
84.0
96.0
88.0
78.0
92.0
81.0
94.0
95.2

57.0
89.0
91.0
85.0
92.0
84.0
91.0
88.0
83.0
83.0
83.0
95.0
87.0
77.0
91.0
80.0
93.0
94.0

53.0
82.0
84.0
79.0
85.0
                                                          744   733
                                                                       698  74.0
                                             13-838

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
NORTHERN STATES POWER: SHERBURNE 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                502  PART. HOURS HOURS  HOURS FACTOR
206
207
208
209
210
211
212
SYSTEM 94.0
82.0
75.0
97.0
74.0
88.0
100.0
90.0
92.7
76.0
69.0
90.0
68.0
81.0
92.0
83.0
85.6







744 688 638 66.9
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE PROBLEMS ENCOUNTERED IN DECEMBER AND JANUARY MERE MAINLY HEATHER
                         RELATED.

                         THERE WERE PROBLEMS WITH THE COAL FEEDER BELTS RESULTING IN MOVING WET
                         COAL FROM OLDER COAL STOCKPILES TO THE BOILER DURING THE DECEMBER-JANUARY
                         PERIOD.
  2/79
  3/79
201
202
203
204
205
206
207
208
209
210
211
212
SYSTEM

201
202
203
204
205
206
207
208
209
210
211
212
SYSTEM
                    93.0
86.0
84.0
73.0
89.0
59.0
76.0
72.0
68.0
80.0
75.0
92.0
65.0
83.6

85.0
69.0
78.0
47.0
71.0
76.0
90.0
78.0
50.0
85.0
                    91.0
                                57.0
                                86.0
                                79.3
86.0
84.0
73.0
89.0
59.0
76.0
72.0
68.0
80.0
75.0
92.0
65.0
83.5

85.0
69.0
78.0
47.0
71.0
76.0
90.0
78.0
50.0
85.0
57.0
86.0
79.3
                                                                             672   671
                                                                                          561  66.2
                                              744   744
                                                           590  53.7
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE  ONLY PROBLEMS  ENCOUNTERED  DURING  FEBRUARY AND MARCH WERE BOILER-RELATED
                          PROBLEMS RESULTING FROM  WET  COAL.

                          THE  RECYCLE  PUMPS  ARE  BEING  REPLACED  WITH  LARGER 8000 GPM WORTHINGTON
                          PUMPS.   DURING THIS PERIOD THE PUMPS  WERE  INSTALLED ON MODULES 204 AND
                          206.
  4/79   SYSTEM       95.0

        **  PROBLEMS/SOLUTIONS/COMMENTS
                                                                              720    717
                                                                                        71.8
  5/79   SYSTEM
                    99.0
                          AS OF  APRIL 1979 THE UTILITY HAS DECIDED  THAT IT WILL ONLY  REPORT  THE
                          AVAILABILITY OF  THE  TOTAL SYSTEM FOR  THIS REPORT.

                                                                              744  263         28.1
                                             13-839

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

NORTHERN STATES POWER: SHERBURNE 2 (CONT.)
	.	PERFORMANCE DATA	•	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD    CAP.
                                                                S02  PART. HOURS  HOURS   HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE LOW BOILER HOURS IN MAY WERE DUE TO COMMENCEMENT OF  THE  ANNUAL BOILER
                         AND TURBINE INSPECTION.

                         ALL PIPING HAS BEEN CHANGED TO FIBERGLASS.

  6/79  SYSTEM       90.0                                                      720    454          38.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE ONLY  PROBLEM REPORTED BY THE UTILITY WAS THE LOSS OF A BOILER SURGE
                         PUMP AFTER THE UNIT RESTARTED.

  7/79  SYSTEM       95.0                                                      744    741          78.9

  8/79  SYSTEM       96.0                                                      744    740          72.3

  9/79  SYSTEM       95.0                                                      720    657          68.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR  OPERATIONAL PROBLEMS HAVE BEEN ENCOUNTERED WITH THIS UNIT SINCE
                         IT CAME BACK ON LINE AFTER THE ANNUAL BOILER/TURBINE OVERHAUL IN MAY.

 10/79  SYSTEM       94.0                                                      744    732

 11/79  SYSTEM       97.0                                                      720    719

 12/79  SYSTEM       97.0                                                      744    662

       *»  PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR  BOILER OR  FGD OPERATIONAL PROBLEMS WERE ENCOUNTERED DURING
                         THE  FOURTH QUARTER  OF 1979.

  1/80  SYSTEM       97.0                                                      744    744          90.1

  2/80  SYSTEM       96.0                                                      696    696          91.8

  3/80  SYSTEM       98.0                                                      744    744          91.9

       *«  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FIRST QUARTER  OF  1980 THE  FGD SYSTEM EXPERIENCED  NO  MAJOR
                         PROBLEMS.

                         A FOUR WEEK BOILER  OUTAGE IS SCHEDULED FOR MAY AT WHICH  TIME THE MARBLE
                         BEDS WILL BE REMOVED FROM THE  FGD SYSTEM.

                         THE  UTILITY HAS DECIDED TO CONVERT THE ENTIRE  MARBLE BED SCRUBBING  SYSTEM
                         TO A SPRAY TOWER SYSTEM BY REMOVING THE MARBLE BEDS AND  MODIFYING THE SPRAY
                         ARRANGEMENT.   TESTS CONDUCTED  AT UNIT 1 IN 1978 AND 1979 SHOU  THAT  MOST  OF
                         THE  S02 IS COLLECTED IN THE  VENTURI SECTION OF THE  SCRUBBING TRAINS AND
                         THAT ALTHOUGH  THE  MARBLE  BEDS  IN THE  ABSORBER  SECTIONS  IMPROVE  INTIMATE
                         S02/SLURRY MIXING,  S02 REMOVAL  EFFICIENCY OF THE SCRUBBING TRAINS  IS NOT
                         MARKEDLY  DIFFERENT WHEN MARBLE  BEDS ARE REMOVED.

  4/80  SYSTEM       96.0                                                       720    704          68.6
                                             13-840

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: SHERBURNE 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                302  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR OPERATIONAL PROBLEMS WERE ENCOUNTERED IN APRIL.

 5/80  SYSTEM      96.0                                                      744   214         24.2

 6/80  SYSTEM     100.0                                                      720    51          2.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS OUT OF SERIVE MOST OF MAY AND JUNE BECAUSE OF THE ANNUAL
                         BOILER AND TURBINE INSPECTION.

 7/80  SYSTEM     100.0       100.0       100.0        82.7                  744   615    615  63.8

       «* PROBLEMS/SOLUTIONS/COHMENTS

                         BOILER TUBE LEAKS CAUSED THE BOILER NOT TO OPERATE FOR 73 HOURS IN JULY.

                         BOTTOM ASH PLUGGING ALSO FORCED THE BOILER DOWN FOR 56 HOURS.

 8/80  SYSTEM     100.0       100.0       100.0       100.0                  744   744    744  70.7

 9/80  SYSTEM     100.0       100.0       100.0       100.0                  720   720    720 100.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER AND FGD SYSTEM RAN CONTINUOUSLY THROUGH AUGUST AND SEPTEMBER
                         WITHOUT ANY PROBLEMS.
10/80
11/80
12/80
SYSTEM
SYSTEM
SYSTEM
100.0
100.0
100.0
100.
100.
100.
0
0
0
100
100
100
.0
.0
.0
99.7
100.0
100.0
744
720
744
742
720
744
742
720
744
81.9
82.2
79.2
** PROBLEMS/SOLUTIONS/COMMENTS
DURING THE OCTOBER-DECEMBER
THE TIME.
1/81
2/81
3/81
SYSTEM
SYSTEM
SYSTEM
100.0
100.0
100.0
100.
100.
100.
0
0
0
100
100
100
.0
.0
.0
PERIOD THE
100.0
98.8
100.0
FGD SYSTEM WAS AVAILABLE
744
672
744
744
664
744
100X
744
664
744
OF
76.5
77.0
78.8
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          DURING THE  FIRST  QUARTER  1981 THE UTILITY REPORTED THAT NO MAJOR FGD-RELAT-
                          ED  PROBLEMS WERE  ENCOUNTERED.

                          WORK  IS CONTINUING ON  CONVERTING THE MARBLE BED SCRUBBING SYSTEM TO A SPRAY
                          TOWER SYSTEM.   SEVEN OF THE TWELVE ABSORBERS ARE COMPLETED.

                                                                              720   579    579  61.0

                                                                              744   679    679  69.0

                                                                              720   713    713  73.0
4/81 SYSTEM
5/81 SYSTEM
6/81 SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
80.0
91.0
99.0
                                             13-841

-------
7/81 SYSTEM
8/81 SYSTEM
9/81 SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
99.0
100.0
85.0
10/81 SYSTEM
11/81 SYSTEM
12/81 SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: SHERBURNE 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER  FGD   CAP.
                                                                S02   PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE SECOND QUARTER THE FGD SYSTEM WAS OUT OF SERVICE  A FEW HOURS
                         AS A RESULT OF A BOILER TUBE LEAK.

                                                                              744   741    741  72.0

                                                                              744   744    744  70.0

                                                                              720   616    616  58.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS TAKEN OUT OF SERVICE TWICE DURING THE THIRD QUARTER
                         AS A RESULT OF BOILER TUBE  LEAKS.

                                                                              744   744    744  79.0

                                                                              720   720    720  73.0

                                                                              744   744    744  79.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER TUBE LEAKS CONTINUED TO BE A PROBLEM  DURING THE  FOURTH QUARTER.

                                                                              744   702    702  82.9

                                                                              672   118    118  16.1

                                                                              744   386    386  37.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED  PROBLEMS WERE ENCOUNTERED
                         DURING THE FIRST QUARTER 1982.  HOWEVER, THE UNIT  WAS DOWN MOST OF FEBRUARY
                         AND PART OF MARCH FOR A SCHEDULED BOILER/TURBINE INSPECTION.

  4/82  SYSTEM                                                                 720

  5/82  SYSTEM                                                                 744

  6/82  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SECOND QUARTER 1982 UPDATE INFORMATION IS NOT  AVAILABLE  AT THIS TIME.

  7/82  SYSTEM                                                                 744

  8/82  SYSTEM                                                                 744

  9/82  SYSTEM                                                                 720

10/82  SYSTEM                                                                 744

11/82  SYSTEM                                                                 720

12/82  SYSTEM                                                                 744

  1/83  SYSTEM                                                                 744

  2/83  SYSTEM                                                                 672
                                             13-842
1/82 SYSTEM
2/82 SYSTEM
3/82 SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
94.4
17.6
51.9

-------
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

NORTHERN STATES POWER: SHERBURNE 2 (CONT.)




	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 3/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION MAS  UNAVAILABLE FOR THE PERIOD OF APRIL 1982 TO MARCH 1983.

 4/83  SYSTEM                                                                720

 5/83  SYSTEM                                                                744

 6/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS  UNAVAILABLE FOR THE PERIOD OF APRIL 1982 THROUGH JUNE 1983.

 7/83  SYSTEM                                                                744

 8/83  SYSTEM                                                                744

 9/83  SYSTEM                                                                720

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS  UNAVAILABLE FOR THE THIRD QUARTER OF 1983.

 10/83  SYSTEM

 11/83  SYSTEM                                                                720

 12/83  SYSTEM                                                                744

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS  NOT AVAILABLE  FOR  THE  FOURTH QUARTER OF 1983.

 1/84  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS  UNAVAILABLE  FOR  THE  FIRST THREE QUARTERS  OF 1984.
                                             13-843

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

  ** UNIT DATA  - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE  GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

  ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH  CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

  ** ESP
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PARTICLE  REMOVAL EFFICENCY - 7.

  **  PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC  TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
      LINER GENERIC MATERIAL
      LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*** FGD SYSTEM

  ** GENERAL DATA
     SALEABLE  PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL  MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT  LEVEL
               (  =100 LB/MMBTU)
               (  .200 LB/MMBTU1
               (****** LB/MMBTU)
PACIFIC POWER * LIGHT
JIM BRIDGER
ft
ROCK SPRINGS
WYOMING
C
   43.
   86.
******
 2034
  550
  508
  509
  550
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
 1283.57       (2720000 ACFM)
*******        (**** F)
  152.         (  500 FT)
CONCRETE
*******        (***** FT)
               (   9300 BTU/LB)
                ******
               (2330890 ACFM)
               (  250 F)
COAL
SUBBITUMINOUS
21632.

    9.00
******
   18.00
******
      .56
******
      .01
******
COLD SIDE
CARBORUNDUM
 1099.9
  121.1
   99.0
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
THROWAWAY PRODUCT
WET SCRUBBING
SODIUM CARBONATE
NONE
AIR CORRECTION DIVISION, UOP
BECHTEL
FULL SCALE

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER 1984
PACIFIC POWER & LIGHT: JIM BRIDGER 4 (CONT.)

     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     L/G RATIO - L/CU.M
     503 REMOVAL EFFICIENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     VANE ANGLES - DEGREES
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 »* FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 *» DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC  MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC  MATERIAL TYPE
 NEW
X   99.00
    91.00
      .2
  1
  2/80
  9/79
 10/76
 NR
 NR
 TRAY TOWER
 SIEVE TRAY
 N/A
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 NATURAL RUBBER
 BLACK NATURAL RUBBER
 PERFORATED TRAY
  1
     2.7        (20.0 GAL/1000 ACF)
    91.0
 PRIMARY COLLECTOR
 NR
 NR
 NR
   45
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 CENTRIFUGAL
 NR
 FORCED DRAFT
 DRY
 CARBON STEEL
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
                                            13-845

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PACIFIC POWER i LIGHT: JIM BRIDGER 4 (CONT.)
 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 «* PUMPS
     SERVICE
      ABSORBER  RECIRCULATION

  **  SOLIDS CONCENTRATING/DEWATERING
      DEVICE
      OUTLET STREAM  CHARACTERISTICS

 ***  SLUDGE

  **  TREATMENT
      METHOD
      DEVICE
      PROPRIETARY PROCESS

  **  DISPOSAL
      NATURE
      TYPE
      LOCATION
      SITE TRANSPORTATION METHOD
      SITE TREATMENT
      SITE SERVICE LIFE - YRS

  **  WATER BALANCE
      WATER LOOP TYPE

  #*  FGD SPARE  CAPACITY INDICES
      ABSORBER  - X

  »*  FGD SPARE  COMPONENT INDICES
      ABSORBER
MIX TANK
N/A
AGITATED TANK
NUMBER

**»»
THICKENER
18X SOLIDS
THICKENED
N/A
N/A
FINAL
POUD
ON-SITE
PIPELINE
CLAY LINING
 11
CLOSED


      .0


      .0
 	PERFORMANCE DATA	•	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS FACTOR
  9/79  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
                              720
 10/79  SYSTEM

 11/79  SYSTEM

 12/79  SYSTEM
                          THE UNIT STARTED OPERATIONS AS SCHEDULED IN SEPTEMBER 1979.  PRESENTLY
                          THE FGD SYSTEM IS IN THE START UP PHASE WITH COMMERCIAL OPERATION SCHEDULED
                          FOR DECEMBER.

                          THE UTILITY IS IN THE PROCESS OF CHECKING INTERLOCKS AND OTHER COMPONENTS
                          BUILT INTO THE FGD SYSTEM TO PROTECT THE BOILER.  FLUE GAS IS PASSING
                          THROUGH MODULES ON AN INDIVIDUAL BASIS.  THE FGD SYSTEM WILL NOT BE
                          OPERATED IN AN INTEGRATED MODE UNTIL LATE OCTOBER.
                              720

                              744
                                             13-846

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PACIFIC POWER & LIGHT: JIM BRIOGER 4 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       *» PROBLEMS/SOLUTIONS/COMMENTS

                         SHAKEDOWN OPERATIONS CONTINUED THROUGHOUT THE FOURTH QUARTER OF 1979.

 1/80  SYSTEM                                                                744

 2/80  SYSTEM                                                                696

 3/80  SYSTEM                                                                7*4

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT IS STILL IN THE SHAKEDOWN PHASE OF OPERATIONS.  A NUMBER OF
                         MECHANICAL PROBLEMS AND SOME CONTROL PROBLEMS HAVE BEEN ENCOUNTERED.
                         NO PROCESS-RELATED PROBLEMS HAVE OCCURRED.

 4/80  41          27.5        18.4        22.3        14.2
       42          24.0        23.9        26.3        18.4
       43          26.6        34.0        34.2        26.1
       SYSTEM      26.0        25.4        27.6        19.6                  720   553    141

       *« PROBLEMS/SOLUTIONS/COMMENTS

                         ALL THREE MODULES MERE OUT OF SERVICE THE FIRST 21 DAYS OF APRIL WHILE THE
                         UTILITY WAITED FOR DELIVERY OF NEW SPRAY NOZZLES.  SOME PLUGGING HAD OCCUR-
                         RED IN THE ORIGINAL NOZZLES.  THE NEW NOZZLES WERE INSTALLED FOR TESTING
                         PURPOSES.

 5/80  41          95.2        46.0        92.6        42.9
       42          72.4        75.1        71.7        70.1
       43          100.0        81.6       100.0        76.1
       SYSTEM      89.2        67.6        88.1        63.0                  744   694    469

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE 42 WAS FORCED OUT OF SERVICE FOR EIGHT DAYS IN MAY WHILE A VORTEX
                         BREAKER WAS INSTALLED IN THE ABSORBER VESSEL.  THE VESSEL WAS DRAINING
                         BEFORE REACHING DESIGN FLUID LEVELS.

                         VORTEX BREAKERS WERE INSTALLED IN MODULES 41 AND 43 AS WELL BUT INSTALLA-
                         TION  IN THESE MODULES WAS NOT UNDERTAKEN DURING PERIODS WHEN MODULE SERVICE
                         WAS REQUIRED.

 6/80  41          81.2        77.7        66.5        30.9
       42          89.2        100.0        85.1        43.2
       43          86.0        75.0        73.6        29.8
       SYSTEM      85.5        87.1        75.4        34.6                  744   296    258

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS DOWN FOR 5 DAYS TO REPAIR A RECIRCULATION PUMP BREAKER
                         ON MODULE 41.

                         MODULES 41 AND 42 WERE UNAVAILABLE FOR A COMBINED TOTAL OF 6 DAYS DUE  TO
                         THE REPLACING OF THE PH CONTROL  PIPING.

 7/80  41          97.3        67.2        96.0        64.8
       42          97.4        91.2        97.1        87.8
       43          99.4        90.2        99.3        86.9
       SYSTEM      98.0        82.9        97.6        79.8                  744    717    594
                                             13-847

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PACIFIC POWER & LIGHT: JIM BRIDGER 4 (CONT.)
___„	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD    CAP.
                                                                S02   PART. HOURS  HOURS  HOURS FACTOR


       »* PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED  IN JULY.

 8/80  41          99.7        92.8        99.7        86.1
       42          94.1        92.3        93.6        85.6
       43          94.7        68.4        92.4        63.5
       SYSTEM      96.2        84.5        95.2        78.4                   744   690   583

       #* PROBLEMS/SOLUTIONS/COMMENTS

                         NO FGD RELATED PROBLEMS WERE REPORTED FOR THE MONTH  OF AUGUST.

 9/80  SYSTEM                                             .0                   720      0     0

10/80  SYSTEM                                             .0                   744      0     0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER AND FGD SYSTEM WERE OUT OF SERVICE DURING THE MONTHS OF SEPTEM-
                         BER AND OCTOBER FOR THE ANNUAL BOILER OUTAGE.

11/80  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO INFORMATION WAS AVAILABLE FOR NOVEMBER 1980.

12/80  41          100.0        85.9       100.0        77.2
       42          91.7        74.6        88.9        66.9
       43          93.0        71.6        90.4        64.2
       SYSTEM      94.9        77.4        93.1        69.4                   744   668   517

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         SCALING PROBLEMS WERE ENCOUNTERED DURING DECEMBER.   NO OTHER MAJOR FGD-
                         RELATED PROBLEMS WERE REPORTED FOR THE MONTH.

  1/81  SYSTEM                                                                 744   695

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION FOR THE MONTH OF JANUARY WAS NOT AVAILABLE.

  2/81  41          93.3        83.8        93.7        82.4
       42          83.9        82.1        88.0        80.8
       43          31.5        23.6        27.3        23.2
       SYSTEM      69.6        63.2        69.7        62.1                   672   661   417

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE 43 WAS DOWN FOR APPROXIMATELY 11 DAYS DURING  FEBRUARY FOR INSTAL-
                         LATION OF A NEW PRESATURATOR AND RECYCLE NOZZLES.

  3/81  41          85.3        81.0        83.4        73.4
       42          70.6        70.6        68.5        64.0
       43          49.5        42.1        43.0        38.2
       SYSTEM      68.5        64.6        65.0        58.5                   744   674   435
                                             13-848

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PACIFIC POWER & LIGHT: JIM BRIDGER 4 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH, PROBLEMS MERE ENCOUNTERED WITH FLOW METERS AND THERE MAS A
                         LACK OF SPARE PARTS NECESSARY FOR FGD SYSTEM OPERATION.
4/81



41
42
43
SYSTEM
3.3
90.8
100.0
62.5
1.2
88.6
93.4
61.1
1.1
89.0
99.7
63.3
1.1
82.4
86.9
56.8
                                                                             720   669    409

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE 41 EXPERIENCED LOM AVAILABILITY DURING APRIL AS A RESULT OF FAILURE
                         OF THE MAG FLOW METER.

 5/81  41         100.0        76.1       100.0        59.1
       42             .0           .0           .0           .0
       43         100.0        98.8       100.0        76.7
       SYSTEM      66.7        58.3        66.7        45.3                  744   578    337

       *« PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE 42 HAS UNAVAILABLE DURING MAY DUE TO FAILURE OF THE MAG FLOW METER.

 6/81  41         100.0        99.1        99.1        95.1
       42         100.0           .0                       .0
       43         100.0        98.9       100.0        95.0
       SYSTEM     100.0        66.0        99.6        63.4                  720   691    456

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD RELATED PROBLEMS HERE REPORTED FOR THE MONTH OF JUNE. MODULE
                         42 HAS NOT IN SERVICE AS A RESULT OF LOH UNIT DEMAND.

 7/81  SYSTEM                                                                744

 8/81  SYSTEM                                                                744

 9/81  SYSTEM                                                                720

 10/81  SYSTEM                                                                744

 11/81  SYSTEM                                                                720

 12/81  SYSTEM                                                                744

 1/82  SYSTEM                                                                744

 2/82  SYSTEM                                                                672

 3/82  SYSTEM                                                                744

 4/82  SYSTEM                                                                720

 5/82  SYSTEM                                                                744

 6/82  SYSTEM                                                                720

 7/82  SYSTEM                                                                744

 8/82  SYSTEM                                                                744

 9/82  SYSTEM                                                                720
                                             13-849

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PACIFIC POWER & LIGHT: JIM BRIDGER 4 (CONT. )
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER   BOILER  FGD   CAP.
                                                                SOS   PART.  HOURS HOURS  HOURS FACTOR



10/82  SYSTEM                                                                 744

11/82  SYSTEM                                                                 720

12/82  SYSTEM                                                                 744

  1/83  SYSTEM                                                                 744

  2/83  SYSTEM                                                                 672

  3/83  SYSTEM                                                                 744

       **  PROBLEMS/SOLUTIONS/COMMENTS

                          INFORMATION MAS UNAVAILABLE FOR THE  PERIOD  OF  JULY 1981 THROUGH MARCH 1983.

  4/83  SYSTEM                                                                 720

  5/83  SYSTEM                                                                 744

  6/83  SYSTEM                                                                 720

       **  PROBLEMS/SOLUTIONS/COMMENTS

                          INFORMATION WAS UNAVAILABLE FOR THE  PERIOD  OF  JULY 1981 TO JUNE 1983.

  7/83  SYSTEM                                                                 744

  8/83  SYSTEM                                                                 744

  9/83  SYSTEM                                                                 720

       **  PROBLEMS/SOLUTIONS/COMMENTS

                          INFORMATION WAS UNAVAILABLE FOR THE  THIRD QUARTER  OF 1983.

 10/83  SYSTEM                                                                 744

 11/83  SYSTEM                                                                 720

 12/83  SYSTEM                                                                 744

       *»  PROBLEMS/SOLUTIONS/COMMENTS

                          THE  UTILITY REPORTED  THAT THE  FGD  SYSTEM WAS DOWN  3 HOURS DURING THE FOURTH
                          QUARTER  DUE TO LOW  PH IN ABSORBER  MODULES 43 AND 44.

                          THE  FGO  SYSTEM WAS  DOWN 2 HOURS DURING THE  FOURTH  QUARTER DUE TO SODA
                          LIQUOR MAKEUP FLOW  PROBLEMS AT MODULE  43.

                          A 4  HOUR FGD SYSTEM OUTAGE OCCURRED  DURING  THE FOURTH QUARTER DUE TO THE
                          REPAIR OF LEAKS.


                          TOTAL FGD SYSTEM OPERATING TIME DURING THE  FOURTH  QUARTER WAS REPORTED TO
                          BE 2199  HOURS.

  1/84  SYSTEM                                                                 7
-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PACIFIC POWER t LIGHT: JIM BRIDGER 4 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGO-RELATED PROBLEMS AROSE DURING THE
                         FIRST THREE QUARTERS OF 1984.
                                             13-851

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
502 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MM
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MM

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - '/.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RAH3E SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 «» MECHANICAL COLLECTOR
     NUMBER
     TYPE

 ** ESP
     NUMBER
     TYPE

 ** PARTICLE SCRUBBER
     NUMBER
     NUMBER OF SPARES
     INITIAL START-UP DATE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - LITER/CU.M
     PH CONTROL ADDITIVE
     PRESSURE DROP - KPA
     SUPERFICIAL GAS VELOCITY - M/S
PENNSYLVANIA POWER
BRUCE MANSFIELD
1
SHIPPINGPORT
PENNSYLVANIA
C
   15.         (
  258.         (  .
                   035 LB/MMBTU)
                   600 LB/MMBTU)
******
 2360
  917
  780
  818
  917
FOSTER WHEELER
PULVERIZED COAL
BASE
 1580.86
  140.6
  290.
CONCRETE
    5.9
               (****** LB/MMBTU)
               (3350000 ACFM)
               ( 285 F)
               ( 950 FT)

               ( 19.2 FT)
               ( 12000 BTU/LB)
                ******
COAL
BITUMINOUS
27912.

   12.80
8.0-15.0
    7.00
5.5-8.5
    3.50
3.0-4.0
********
******
 0
NONE
 0
NONE
 6
 0
12/75
VENTURI TOWER
FIXED-THROAT/TOP-ENTRY PLUMB BOB
N/A
GE ENVIRONMENTAL SERVICES
35.5 DIA X 52.0
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER
NONE
 1
 1258.2        (19971 GPM)
    4.8        (35.8 GAL/1000ACF)
THIOSORBIC LIME
    4.7        (19.0 IN-H20)
   61.0        (  200.0 FT/S)
                                            13-852

-------
                                                  UTILITY F6D SURVEY:  OCTOBER 1983 - SEPTEMBER
PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)

     INLET GAS FLOW RATE - CU.M/S
     INLET 6AS TEMPERATURE - C
     S02 REMOVAL EFFICENCY - X
     PARTICLE REMOVAL EFFICIENCY - X

*** FGO SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY •
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X
     DESIGN COAL HEAT CONTENT - J/G
     DESIGN COAL ASH CONTENT - X
     OPER. t MAINT. REQUIREMENT - MANHR/DAY

 ** QUENCHER/PRESATURATOR
     NUMBER

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     502 REMOVAL EFFICIENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     MANUFACTURER
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     DISTANCE BETWEEN VANES - CM
     VANE ANGLES - DEGREES
   263.3
   140.6
    70.0
    99.8
(  558000 ACFM)
(   285 F)
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIME
 MAG
 GE ENVIRONMENTAL SERVICES
 GILBERT/COMMONWEALTH ASSOCIATES
 FULL SCALE
 NEW
X   99.80
    92.10
     4.1
  1
  6/76
 12/75
 10/74
     4.70
 27679.4
    19.70
   214.0
(  11900 BTU/LB)
  6
  0
 VENTURI TOWER
 FIXED THROAT
 N/A
 GE ENVIRONMENTAL SERVICES
 34.0 OIA X 51.5
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 GLASS FLAKE-FILLED POLYESTER
 RIGIFLAKE 4850
 NONE
  1
  1112.
     5.5
     1.5
    30.5
   201.31
    52.8
    92.1
(17650 GPM)
(  41.4 GAL/1000 ACF)
(  6.0 IN-H20)
(100.0 FT/S)
(  426600 ACFM)
(   127 F)
 PRIMARY COLLECTOR
  6
  0
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 HEIL PROCESS EQUIPMENT
 HORIZONTAL
     1
     4
     7.6        ( 3.00 IN)
   90
                                            13-853

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT. )

     PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH FREQUENCY
     WASH RATE - L/S

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     SEAL AIR FLOW - CU. M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 »« DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     SEAL AIR FLOW - CU. M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIA-L SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     SEAL AIR FLOW - CU. M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 #» DUCTWORK
     LOCATION
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE
         .1         (   .6 IN-H20)
        3.0         (  10.0 FT/S)
    ORGANIC
    POLYPROPYLENE
    THICKENER  OVERFLOW
    ONCE EVERY 12  MINUTES
        3.8         (    60 GAL/MIN)
     6
     0
    CENTRIFUGAL
    GREEN  FUEL  ECONOMIZER
    UNIT
    FORCED DRAFT
    WET
     263.32
      47.8
      18.9
    CARBON STEE;
 (  558000 ACFM)
 (   118 F)
 (62.0 IN-H20)
HIGH ALLOY; HIGH ALLOY; HIGH ALLOY
    SHUT-OFF
    BUTTERFLY
    N/A
    MOSSER
         .00        (       0  ACFM)
    STAINLESS STEEL
    AUSTENITIC
    NONE
    N/A
     6
    NONE
    LOUVER
    NR
    MOSSER
         .00       (       0 ACFM)
    STAINLESS STEEL
    AUSTENITIC
    NONE
    N/A
     6
    CONTROL
    LOUVER
    NR
    GREEN FAN
         .00        (       0  ACFM)
    STAINLESS STEEL
    AUSTENITIC
    NONE
    N/A
    INLET
    CARBON STEEL
    AISI 1110
    NONE
    N/A
    OUTLET TO INOPERABLE REHEATER
    CARBON STEEL
    AISI 1110
    ORGANIC
    GLASS FLAKE-FILLED POLYESTER
13-8E'»

-------
PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 »* REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER
     FULL LOAD DRY FEED CAPACITY - M.TONS/HR
     PRODUCT QUALITY - 7. SOLIDS

 ** TANKS
     SERVICE
     SCRUBBER RECYCLE
     ABSORBER RECYCLE
     THICKENER OVERFLOW
     CALCILOX ADDITION [MIX!
     SLAKER TANK
     SLURRY STORAGE

    PUMPS
     SERVICE
     VENTURI RECIRCULATION
     SLURRY FEED
     LIME SLURRY RECIRCULATION
     ABSORBER RECIRCULATION
     THICKENER UNDERFLOW
     THICKENER CLEAR WATER TRANSFER
     SLUDGE

 »« SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMSER
     NUMBER OF SPARES
     CONFIGURATION
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LIHER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

 *** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS
     INLET QUALITY - 7.

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT
     SITE DIMENSIONS
OUTLET FROM INOPERABLE REHEATER
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER
SLAKER
DETENTION
N/A
DORR-OLIVER
 2
   20.0        (22 TPH)
   13.5
NUMBER

   6
   6
   1
   3
   2
   1
NUMBER

  12
   4
   4
  12
   4
   4
«*«*
THICKENER
 1
0
CYLINDRICAL
200.0 DIA
CARSON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER [WALLS!; MAT-REINFO
PARTICLE SCRUBBER BLEED
10X SOLIDS
30X SOLIDS
SLUDGE TREATMENT
PARTICLE SCRUBBER RECYCLE LOOP
FIXATION
MIX TANK
DRAVO  (CALCILOX1
   30.0
FINAL
POND
OFF-SITE
PIPELINE
NONE
1300-1400 ACRES
                                            13-855

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT. )

     SITE CAPACITY - CU.M
     SITE SERVICE LIFE - YRS
 ** PROCESS CONTROL AND INSTRUMENTATION
     PROCESS STREAM
     CHEMICAL PARAMETERS
     CONTROL LEVELS
     MONITOR TYPE
     MONITOR LOCATION
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE

 ** WATER BALANCE
     WATER LOOP TYPE
     RECEIVING WATER STREAM

 ** CHEMICALS AND CONSUMPTION
     FUNCTION
     NAME
     PRINCIPAL CONSTITUENT
     SOURCE/SUPPLIER
     UTILIZATION  - y.
     POINT OF ADDITION

 ** FGD  SPARE CAPACITY INDICES
     SCRUBBER - X
     ABSORBER - X
     MIST ELIMINATOR - 7.
     FAN - X
     THICKENER -  X

 ** FGD  SPARE COMPONENT INDICES
     SCRUBBER
     ABSORBER
     MIST ELIMINATOR
     FAN
     THICKENER
                        59937000
                       25
(  49000.0 ACRE-FT)
                      INLET SLURRY TO SCRUBBER * ABSORBER
                      PH
                      PH  7
                      UNILOCK
                      SPRAY HEADERS
                      AUTOMATIC
                      FEEDBACK
                      OPEN
                      OHIO RIVER
                      ABSORBENT
                      THIOSORBIC LIME
                      90X CAO MIN.,  2-6X MGO,  MAX. 4X ACID INSOLUBLES
                      DRAVO
                         84.0
                      SLAKER
 	PERFORMANCE  DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                                                 X REMOVAL   PER  BOILER  FGO   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS FACTOR
 12/75  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
                           INITIAL OPERATION (SHAKEDOWN AND DEBUGGING) FOR PART OF THE SYSTEM COM-
                           MENCED IN DECEMBER 1975.
  0/76  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
  1/76  SYSTEM
SINCE THE UNIT COMMENCED SCRUBBING OPERATIONS A NUMBER OF PROBLEM
AREAS HAVE BEEN ENCOUNTERED.  MAJOR AREAS OF CONCERN ARE SPECIFIED
BELOW:
 1. EXCESSIVE MAINTENANCE PROBLEMS WITH THE WET ID FAN HOUSINGS.
 2. EXCESSIVE WATER ENTRAINMENT AND CARRY OVER OUT OF THE STACK CAUSING A
    STACK RAIN PROBLEM.
 3. REHEAT BURNER PROBLEMS.
 4. STACK FLUE LINER FAILURES.

                                                   744
                                             13-856

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE UNIT SHUT DOWN FOR ONE WEEK DUE TO PLUGGED MIST ELIMINATORS.

                          AN ID FAN HOUSING VIBRATION CAUSED PART OF THE ONE WEEK OUTAGE, ALONG
                          WITH THE MIST ELIMINATOR PROBLEMS.
 2/76  SYSTEM

 3/76  SYSTEM
                                                           696
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          FIRST ATTEMPTS AT STARTING UP THE REHEAT BURNERS WERE MADE THIS MONTH.
                          SO MANY PROBLEMS WERE ENCOUNTERED THAT THE SYSTEM SUPPLIER IS GOING TO
                          REDESIGN NEW REHEAT BURNERS.
 4/76  SYSTEM
                                                           720    506
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE INSTALLATION BEGAN PARTIAL COMMERICAL OPERATION ON APRIL 5.

                          TOTAL OPERATING HOURS ACCUMULATED TO DATE ARE AS FOLLOWS: 0, 210, 984.
                          2147, 2808, AND 2427 FOR MODULES A THROUGH F RESPECTIVELY.  THE SCRUBBING
                          SYSTEM  IS CURRENTLY HANDLING FLUE GAS AT A TOTAL EQUIVALENT CAPACITY OF
                          APPROXIMATELY 640 MW (GROSS).
  5/76  A
       B
       C
       0
       E
       F
       SYSTEM
                   80.0
             35.1
            100.0
             99.5
             82.7
            100.0
             82.9
             83.4
28
81
79.6
66.1
83.6
66.3
67.5
                                                                             744   595
             502
       »* PROBLEMS/SOLUTIONS/COMMENTS
                          THE  LAST SCRUBBER TRAIN WAS PLACED IN SERVICE DURING THE MONTH.  DURING
                          OFF  PEAK HOURS ON THE WEEKENDS WHEN THE UNIT IS OPERATING AT REDUCED
                          LOADS, MAINTENANCE IS PERFORMED ON THE SHUT DOWN FGD MODULES SO THAT THEY
                          WILL BE IN OPERATING CONDITION FOR FULL LOAD OPERATION DURING THE HIGH
                          DEMAND.
  6/76
       A
       B
       C
       D
       E
       F
       SYSTEM
100.0
             99.2
             94.4
             97.4
             93.6
             97.9
             79.6
             93.7
99.2
94.4
97.4
93.6
97.9
79.6
93.7
720   720
675
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE UNIT WAS DECLARED COMMERCIALLY AVAILABLE FOR FULL  LOAD OPERATION AT
                          825 MW  (NET) ON  JUNE 1,  1976.  OVER THE PERIOD A REVISED SCRUBBER BAFFLE
                          SYSTEM  WAS  INSTALLED IN  AN EFFORT TO CORRECT SCRUBBER  RECYCLE PUMP CA-
                          VITATION PROBLEMS.
  7/76
             79.8
             87.7
             90.0
72.2
79.3
81.5
                                             13-857

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)
..__	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                              X REMOVAL   PER  BOILER  FGD   CAP.
                                              S02   PART.  HOURS HOURS  HOURS FACTOR
  8/76
 11/76
       D
       E
       F
       SYSTEM
 90.0
             94.7
             98.*
             98.2
             91.5
                        85.6
                        88.9
                        88.8
                        82.7
                      7*4   673
                                   615
       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE SYSTEM SUPPLIER IS STILL TRYING TO SOLVE THE REHEAT BURNER PROBLEMS.

                          TESTS CONDUCTED THIS MONTH SHOWED THAT THE FGD SYSTEM MIST ELIMINATORS ARE
                          NOT PERFORMING TO DESIGN AND THAT THERE IS EXCESSIVE WATER ENTRAINED IN
                          THE CLEANED FLUE GASSES CAUSING A STACK RAIN PROBLEM.  CHEMICO IS WORKING
                          ON THE DESIGN OF ADDITIONAL MIST ELIMINATORS THAT WILL REMOVE THIS EXCESS
                          WATER.
        A
        B
        C
        D
        E
        F
        SYSTEM
 95.0
95.3
87.9
92.6
75.9
70.9
94.8
86.2
                                       .3
                                       .3
90.
83.
87.8
71.9
67.2
89.8
81.7
                                                                             744   705
                                                                                          608
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          SECONDARY VERTICAL MIST ELIMINATORS WERE INSTALLED IN THE ABSORBER DIS-
                          CHARGE DUCT IN AN ATTEMPT TO REDUCE THE EXCESSIVE ENTRAINED WATER.  THEY
                          DID NOT WORK BECAUSE THE FLUE .GAS BLEW THEM APART IN A FEU MINUTES OF OP-
                          ERATION.
  9/76   A
        B
        C
        D
        E
        F
        SYSTEM

 10/76   A
        B
        C
        D
        E
        F
        SYSTEM
100.0
98.
85.
96.
96.
82.8
64.4
87.3
               .3
               .7
               .3
               .5
  .3
  .7
  .3
  .5
                    99.0
        A
        B
        C
        D
        E
        F
        SYSTEM
                    38.0
             96.1
             74.3
             85.4
             83.8
             93.5
             93.5
             87.8

             97.5
            100.0
            100.0
             40.8
             57.4
             88.8
             80.8
98.
85.
96.
96.
82.8
64.4
87.3

95.4
73.8
84.8
83.2
92.9
92.9
87.2
                                                           720   720
                                                                        629
                                                                             744   739
                                                                                          649
                        37.5
                        38.6
                        39
                        15
                        22
                        34
                                                       31.2
                                                                             720    277
                                                                                           225
        «*  PROBLEMS/SOLUTIONS/COMMENTS
                          A THREE WEEK OUTAGE OCCURRED DUE TO A FURNACE IMPLOSION.

                          DURING THE OUTAGE SCALE THROUGHOUT THE FGD SYSTEM WAS REMOVED.

                          DURING THE THREE WEEK OUTAGE THE UNIT 1 CHIMNEY FLUES WERE  INSPECTED    THE
                          A-SIDE FLUE POLYESTER LINING MATERIAL WAS FLAKING OFF AND ACID  ATTACK WAS
                          STARTING TO CORRODE THE CARBON STEEL FLUE.  THE LINING SUPPLIER IS
                          INVESTIGATING THE PROBLEM.
                                            13-858

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                              X REMOVAL   PER  BOILER  FGD   CAP.
                                              S02  PART. HOURS HOURS  HOURS FACTOR
                          DURING THE OUTAGE THE PLUGGED MIST ELIMINATORS MERE CLEANED.
12/76  A
       B
       C
       0
       E
       F
       SYSTEM

 1/77  A
       B
       C
       D
       E
       F
       SYSTEM
             80.9
            100.0
             94.7
             60.0
                         78.5
                         97.5
                         91.9
                         58.2
             86,
             86.
100.0

 95.0
 92.0
 77.0
 95.0
 92.0
 91.0
 90.3
 84.7

 98.0
 91.0
 74.0
 98.0
 93.0
 91.0
 90.8
83.6
84.1
62.3

89.0
82.0
68.0
89.0
84.0
83.0
82.5
744   722
             612
                                                                             744   675
                                                                                          614
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          SEVERE WINTER WEATHER MADE OPERATION OF THE OUTDOOR FGD SYSTEM VERY DIFFI-
                          FICULT AND AFFECTED THE RELIABILITY OF THE UNIT.

                          DURING THE FIRST PART OF THE MONTH THE THICKENER RAKE MECHANISM JAMMED AND
                          COULD NOT BE REPAIRED.  THE THICKENER WAS OPERATED FOR APPROXIMATELY THREE
                          WEEKS WITH THE RAKE STOPPED UNTIL THE UNIT 2 THICKENER COULD BE PUT INTO
                          EMERGENCY SERVICE.
  2/77
       A
       B
       C
       D
       E
       F
       SYSTEM
 77.0
 69.0
 77.0
 86.0
 92.0
 81.0
 80.3
 81.0
 70.0
 61.0
 96.0
100.0
 84.0
 85.3
65.0
56.0
65.0
77.0
81.0
67.0
68.5
672   540
             460
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          A SECOND SET OF VERTICAL SECONDARY MIST ELIMINATORS WAS INSTALLED IN THE
                          ABSORBER DISCHARGE DUCT BUT THE FLUE GAS BLEW THEM OUT BEFORE THEIR EFFI-
                          CIENCY  FOR REMOVING ENTRAINED WATER IN THE FLUE GAS COULD BE TESTED.
  3/77   A
        B
        C
        D
        E
        F
        SYSTEM
 99.0
100.0
 58.0
 95.0
 97.0
 80.0
 88.2
 98.0
100.0
 58.0
 95.0
 97.0
 77.0
 87.5
34.8
35.5
20.4
33.9
34.5
27.2
31.1
                      744   264
                                   231
       **  PROBLEMS/SOLUTIONS/COMMENTS
                          AT MIDNIGHT ON MARCH  12,
                          OVERHAUL OUTAGE.
                                 THE UNIT WAS SHUT DOWN FOR A 10-WEEK TURBINE
                          DURING THE MARCH OUTAGE REPAIRS WERE STARTED ON THE A-SIDE CHIMNEY FLUE
                          WHICH WILL NOT BE COMPLETED UNTIL THE END OF AUGUST.  AN INSPECTION OF THE
                          B-SIDE CHIMNEY FLUE SHOWED THE SAME TYPE OF REPAIRS WOULD BE NEEDED, BUT
                          WORK WILL NOT START ON THE B-SIDE UNTIL THE A-SIDE FLUE HAS BEEN REPAIRED.
                          BECAUSE OF THESE REPAIRS  THE UNIT WILL BE OPERATING AT APPROXIMATELY HALF
                          LOAD FOR ROUGHLY ONE  YEAR.

                          BECAUSE OF THE EXCESSIVE  MAINTENANCE REQUIRED ON THE RUBBER LINED CARBON
                          STEEL ID FAN HOUSINGS FROM PIECES OF SCRUBBER SCALE DAMAGING THE LINING
                                             13-859

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)
	,	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                             X REMOVAL
                                             S02  PART.
                                              PER  BOILER  FGD   CAP.
                                             HOURS HOURS  HOURS FACTOR
                          AND CORROSION OF THE CARBON STEEL, INCONEL PLATE WILL BE INSTALLED ON THE
                          SCROLL AREA OF EACH OF THE SIX FANS DURING THE OUTAGE.

                          A NEWLY DESIGNED SECONDARY VERTICAL MIST ELIMINATOR WILL BE INSTALLED IN
                          THE ABSORBER DISCHARGE DUCT OF ONE OF THE SCRUBBER MODULES DURING THE OUT-
                          AGE.

                          DURING THE OUTAGE ALL SCRUBBING VESSELS, DUCTS, PIPING AND MIST ELIMINATOR
                          WILL BE CLEANED AND ALL THE SCALE REMOVED.

                          DURING OPERATION OF THE FGD SYSTEM THE PH CONTROL COULD NOT BE AUTOMATED
                          BECAUSE OF POOR DESIGN AND OPERATIONAL PROBLEMS WITH THE PROVIDED CONTROL
                          SYSTEM.  PH CONTROL WAS MANUALLY SAMPLED AND CONTROLLED OVER APPROXIMATELY
                          ONE YEAR OF OPERATION.  THE PH CONTROL AND MONITORING SYSTEM ARE BEING RE-
                          VISED BY OPERATING PERSONNEL DURING THE OUTAGE IN AN EFFORT TO IMPROVE THE
                          THE PH CONTROL SYSTEM.

                          THE LIME ADDITION PIPING IS BEING REVISED IN EACH OF THE SCRUBBER VESSELS
                          DUE TO THE SEVERE SCALING OCCURRING WITH THE CURRENT LIME ADDITION SYSTEM.

                          THE SYSTEM SUPPLIER IS REDESIGNING THE EXISTING MIST ELIMINATOR SPRAY PIP-
                          ING IN AN EFFORT TO CORRECT THE EXCESSIVE SCALING AND PLUGGING OF THE MIST
                          ELIMINATORS.

                          CHANGES IN FLUSH WATER AND SEAL WATER PIPING ARE BEING MADE IN AN EFFORT
                          TO CLOSE THE WATER LOOP.

                          NEWLY MODIFIED REHEAT BURNERS WILL BE INSTALLED DURING THE OUTAGE AND
                          TESTED ON THE B-SIDE REHEATER WHEN THE UNIT STARTS UP IN MAY.

                          THE UNIT 1 THICKENER WAS CLEANED OUT AND THE JAMMED RAKE DRIVE MECHANISM
                          WAS REPAIRED DURING THE OUTAGE.
  4/77  SYSTEM
  5/77
A
B
C
D
E
F
SYSTEM
                      .0
                      .0
                      .0
                   100.0
                   100.0
                   47.2
                   41.2
              .0
              .0
              .0
            84.0
            84.8
            41.2
            35.0
                           .0

                           .0
                           .0
                           .0
                         13.7
                         13.8
                          6.7
                          5.7
                                                                             720
                                                                                                  .0
                                                                             744   121
                                                                                           42
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          THE UNIT WAS STARTED UP ON MAY 23 USING D, E, AND F MODULES DUE TO REPAIRS
                          BEING MADE TO THE A-SIDE CHIMNEY FLUE.

                          THERE WERE PROBLEMS SLAKING LIME AND GETTING MAGNESIUM  LEVELS BUILT UP IN
                          THE SCRUBBER RECYCLE LOOPS AFTER STARTUP.
  6/77
        A
        B
        C
        D
        E
        F
        SYSTEM
94
95.0
90.0
46.5
   .0
   .0
   .0
100.0
100.0
 97.0
 49.5
                                                  .0
                                                  .0
                                                  .0
                                                94.0
                                                95.1
                                                90.0
                                                46.5
                                                                             720   669
                                                                                           335
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          HORIZONTAL MIST ELIMINATOR PRESSURE DROPS INCREASED TO THE  POINT  THAT  NEW
                          MIST ELIMINATORS HAD TO BE INSTALLED IN JUNE ON THE D, E AND  F  SCRUBBERS
                          AND THE D AND E ABSORBERS.
                                            13-860

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                             X REMOVAL   PER  BOILER  FGD   CAP.
                                             S02  PART.  HOURS HOURS  HOURS FACTOR
7/77






A
B
C
D
E
F
SYSTEM
.0
.0
.0
99.0
99.0
100.0
49.7
.0
.0
.0
100.0
100.0
100.0
50.0
.0
.0
.0
66.0
66.0
63.0
32.5






744 473 242
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          UNIT 1 WAS DOWN FROM JULY 1 THROUGH JULY 12 TO MAKE SOME MODIFICATIONS TO
                          THE GENERATOR COOLING SYSTEM.  ON JULY 19 AND 20 THE PENNSYLVANIA DEPART-
                          MENT OF ENVIRONMENTAL RESOURCES TESTED THE S02 AND PARTICLE EMISSIONS FROM
                          THE UNIT 1 FGD SYSTEM.  S02 EMISSIONS WERE 0.44 LB/MM BTU AND 1.26 LB/MM
                          BTU FOR THE TWO TESTS RESPECTIVELY.  FGD S02 REMOVAL EFFICIENCY VARIED
                          FROM 78X TO 89X FOR THE MONTH.
 8/77  A
       B
       C
       D
       E
       F
       SYSTEM
55.0
53.0
31.0
96.0
95.0
88.0
69.7
 57.0
 56.0
 31.0
100.0
100.0
 95.0
 73.2
52.0
50.0
28.0
93.0
93.0
85.0
66.8
                                                                             744   692
                                                                                          497
       *» PROBLEMS/SOLUTIONS/COMMENTS

                          UNIT- 1 WAS DOWN FROM AUGUST 13 TO 15 BECAUSE OF BOILER TUBE LEAKS.

                          ON AUGUST 16 THE 1A CHIMNEY FLUE LINER REPAIRS WERE COMPLETED AND THE A,
                          B AND C TRAINS WERE STARTED UP.

                          SEVERAL REPAIRS WERE MADE TO THE ID FAN HOUSING THIS MONTH.

                          THE  AVERAGE S02 REMOVAL EFFICIENCY FOR THE MONTH WAS 86.77. BASED ON THREE
                          GRAB SAMPLES.

                          YORK RESEARCH BEGAN SETTING UP EQUIPMENT TO CONTINUOUSLY MONITOR THE 502
                          REMOVAL EFFICIENCIES AS PART OF AN EPA RESEARCH PROJECT TO DETERMINE FEA-
                          SIBLE NSPS FOR FGD.

                          EXTENSIVE MODIFICATIONS ARE BEING MADE IN THE PH CONTROL SYSTEMS IN AN EF
                          FORT TO DEVISE A WORKABLE PH CONTROL SYSTEM.
  9/77  A
       B
       C
       D
       E
       F
       SYSTEM
84.0
82.0
81.0
53.0
50.0
43.0
65.5
 97.0
 95.0
 98.0
 60.0
 56.0
 44.0
 75.0
75.0
73.0
76.0
46.0
44.0
34.0
58.0
                      720   558
                                                            418
       ** PROBLEMS/SOLUTIONS/COMMENTS
                           FROM SEPTEMBER  17 TO  22 THE UNIT WAS DOWN TO INSTALL RIGGING IN THE IB
                           CHIMNEY  FLUE TO BEGIN FLUE LINER REPAIRS.  D, E AND F TRAINS WERE OFF
                           THE REMAINDER OF THE  MONTH.

                           THE AVERAGE S02 REMOVAL EFFICIENCIES FOR THE MONTH WERE  93.2X BASED ON
                           FOUR GRAB SAMPLE TESTS.

                           A BOILER TUBE LEAK CAUSED THE UNIT TO BE DOWN SEPTEMBER  10 TO 12.
                                             13-S61

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)
PERIOD
10/77






MODULE
A
B
C
D
E
F
SYSTEM
AVAILABILITY
93.0
98.0
87.0
.0
.0
.0
46.3
OPERABILITY
96.0
100.0
90.0
.0
.0
.0
47.7
RELIABILITY UTILIZATION
93.0
98.0
87.0
.0
.0
.0
46.3
'/. REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR






744 720 344
 11/77
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE C-MODULE MIST ELIMINATOR SPRAY NOZZLES AND MIST  ELIMINATOR  ITSELF WERE
                          CLEANED.

                          ABS STACK REPAIRS ON WIT 2 NECESSITATED TAKING UNIT 1  DOWN FOR TWO  DAYS.
                          (A PROTECTIVE CAP HAD TO BE PUT OVER THE 2B  FLUE  BY  HELICOPTER.  PREVAIL-
                          ING WINDS NECESSITATED TAKING UNIT 1 OFF IN  ORDER TO DO THIS.)
A
B
C
D
E
F
SYSTEM
                    95.0
                    99.0
                    91.0
                      .0
                      .0
                      .0
                    47.5
95.0
99.0
91.0
  .0
  .0
  .0
47.5
95.0
99.0
91.0
  .0
  .0
  .0
47.5
                                                                              720    720
                                                                                   342
        ** PROBLEMS/SOLUTIONS/COMMENTS
                           REMOVAL  OF  THE OLD COATING AND  PRIMING OF  THE  FLUE  LINING IN FLUE  IB  IS
                           PROCEEDING  SLOWER THAN ANTICIPATED.   IT  IS EXPECTED THAT TOTAL WORK ON THE
                           FLUE  WILL NOT BE COMPLETED UNTIL  FEBRUARY  OR MARCH  1978.
 12/77  A
                   100.0
                               100.0
B
C
D
E
F
SYSTEM
93.0
99.0
.0
.0
.0
48.7
94.0
100.0
.0
.0
.0
49.0
                                                        91.0
                                                        79.0
                                                        91.0
                                                          .0
                                                          .0
                                                          .0
                                                        43.5
                                                                              744    626
                                                                                           324
        ** PROBLEMS/SOLUTIONS/COMMENTS
                           SANDBLASTING  OF  UNIT  IB  FLUE  IS NEARING  COMPLETION.
                           LINED  WITH  CXL-2000.
                                                                        THE FLUE WILL BE RE-
  0/78  SYSTEM
        ** PROBLEMS/SOLUTIONS/COMMENTS
1/78 A
B
C
D
E
F
SYSTEM
100.0
.0
100.0
.0
.0
.0
33.3
100.0
.0
100.0
.0
.0
.0
33.3
                           NOTE:  AN  ATTEMPT  IS  ALWAYS MADE TO BEGIN OPERATION  OF  THE  BOILER  AND  FGD
                                 SYSTEM  SIMULTANEOUSLY  AT BRUCE  MANSFIELD.   OCCASIONALLY PROBLEMS DE-
                                 LAY BOILER  STARTUP  MAKING IT POSSIBLE  FOR  MONTHLY  FGD  MODULE  HOURS
                                 TO  EXCEED ACTUAL BOILER HOURS.

                                                       58
                                                        58
                                                   0
                                                   0
                                                   0
                                                  .0
                                                  .0
                                                  .0
                                                19.3
                                                                              744   331
                                                                                           144
                                             13-862

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT. )
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  F6D   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
2/78






A
B
C
D
E
F
SYSTEM
79.0
61.0
82.0
.0
.0
.0
37.0
100.0
80.0
100.0
.0
.0
.0
46.7
                          THE UNIT TRIPPED SEVERAL TIMES DUE TO DIFFICULTIES IN BURNING WET STOCK-
                          PILE COAL.

                          THERE WERE PROBLEMS WITH THE IB FAN WHICH NECESSITATED EXTENSIVE REPAIRS.
                          LINING ABRASION AND DISBONDMENT IN THE FAN CAUSED CORROSION OF UNDERLYING-
                          SUPPORT METAL.

                                                       79.0
                                                       61.0
                                                       82.0
                                                         .0
                                                         .0
                                                         .0
                                                       37.0                  672   514    249
       »* PROBLEMS/SOLUTIONS/COMMENTS
3/78 A
B
C
D
E
F
SYSTEM
43.0
91.0
90.0
65.0
50.0
60.0
66.5
47.0
98.0
97.0
70.0
54.0
65.0
71.8
                          EXTENSIVE REPAIRS TO THE IB ID FAN AND THE EMERGENCY NEED FOR LOAD FROM
                          THE PLANT DURING THE COAL STRIKE TEMPORARILY OVERLOADED THE 1A AND 1C
                          TRAINS.  THE 1C MIST ELIMINATORS WILL BE REPLACED AS A RESULT OF THIS.

                          THE IB FLUE RELINING CONTINUED.

                                                       43.0
                                                       91.0
                                                       90.0
                                                       65.0
                                                       50.0
                                                       60.0
                                                       66.5                  744   689    495
           PROBLEMS/SOLUTIONS/COMMENTS
4/78 A
B
C
D
E
. F
SYSTEM
74.0
88.0
49.0
87.0
97.0
94.0
81.5
74.0
88.0
49.0
87.0
97.0
94.0
81.5
                           REPLACEMENT  OF THE  LINING  IN THE IB CHIMNEY WITH CXL 2000 WAS COMPLETED.

                           REPAIRS  WERE MADE ON THE A, B AND C FAN HOUSINGS.

                                                       74.0
                                                       88.0
                                                       49.0
                                                       87.0
                                                       97.0
                                                       94.0
                                                       81.5
                                                          720   720
                                                                       587
        ** PROBLEMS/SOLUTIONS/COMMENTS

                           FAN HOUSINGS LEAK REPAIRS WERE  MADE  DURING  APRIL.
                           MISCELLANEOUS LEAK  REPAIRS  WERE  MADE  TO  DUCTS.
  5/78   A
        B
        C
        D
        E
        F
        SYSTEM
98.0
  .0
98.0
91.0
92.0
92.0
78.5
97.0
  .0
97.0
85.0
84.0
86.0
74.8
59.0
  .0
59.0
52.0
52.0
53.0
45.8
744   457
341
                                             13-863

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR


       *# PROBLEMS/SOLUTIONS/COMMENTS

                          THE ANNUAL BOILER INSPECTION OUTAGE BEGAN ON MAY 20.

                          EXTENSIVE REPAIRS WERE MADE ON THE IB FAN.

 6/78  A              .0
       B              .0
       C          100.0
       D          100.0
       E          100.0
       F          100.0
       SYSTEM      66.7                                  .0                  720     0      0     .0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE BOILER INSPECTION AND GENERATOR STATOR COOLER REPAIRS CONTINUED
                          THROUGH JUNE.

 7/78  SYSTEM                                                                744

 8/78  SYSTEM                                                                744

 9/78  SYSTEM                                                                720

 10/78  SYSTEM      96.3                                                      744   671

 11/78  SYSTEM                                                                720

 12/78  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          NO INFORMATION WAS AVAILABLE FOR THIS REPORT PERIOD.

 1/79  SYSTEM                                                                744

 2/79  SYSTEM                                                                672

 3/79  SYSTEM                                                                744

 4/79  SYSTEM                                                                720

 5/79  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          UNIT 1  IS CURRENTLY DOWN FOR A BOILER OVERHAUL.

                          SIX OF  THE TWELVE FAN HOUSINGS HAVE BEEN CHANGED FROM CARBON STEEL TO
                          INCOLLOY 825.

 6/79  SYSTEM                                                                72o

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE UTILITY REPORTS THAT THE AVAILABILITY FROM JANUARY 1, 1979 THROUGH
                          MAY 31i 1979 WAS 92.OX.

                          THE UTILITY REPORTED THAT FAN MOTOR FAILURES WERE A MAJOR PROBLEM AREA
                          DURING  THE FIRST HALF OF 1979.

 7/79  SYSTEM                                                                744
                                             13-864

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER
PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
 8/79

 9/79
SYSTEM

SYSTEM

** PROBLEMS/SOLUTIONS/COMMENTS
                                                          744

                                                          720
10/79

11/79

12/79
SYSTEM

SYSTEM

SYSTEM
96.1

90.8

99.8
                         FAN HOUSING WORK (CHANGING FROM LINED CARBON STEEL TO INCOLLOY 825) IS
                         CONTINUING.

                         NEW PH MONITOR MODIFICATIONS HAVE YIELDED PROMISING RESULTS WITH RESPECT
                         TO MONITOR AVAILABILITY.

                         THE FGO SYSTEM ATTRIBUTED 17. 4X OF THE TOTAL UNIT UNAVAILABILITY FOR 1979
                         TO DATE.  THE BREAKDOWN IS AS FOLLOWS:
                              7.6X SCRUBBER ID FAN WORK/PROBLEMS
                              8.3X GENERAL SCRUBBER PROBLEMS AND MAINTENANCE
                              l.OX REAGENT HANDLING PROBLEMS (LIME SLAKER AND PIPING)
                              0.5X MIST ELIMINATOR PLUGGING
720
  1/80

  2/80
  3/80
** PROBLEMS/SOLUTIONS/COMMENTS

                  DURING THE PERIOD AN ADDITIONAL FAN HOUSING WAS REPLACED WITH THE NEW
                  INCOLLOY 825.  BY THE END OF 1980 ALL THE FAN HOUSINGS WILL BE REPLACED
                  WITH THE NEW MATERIAL.

                  WHERE THE NEW PH MONITORS HAVE BEEN INSTALLED> THE PROBE MAINTENANCE
                  HAS BEEN CUT 80X, AND THE MIST ELIMINATORS HAVE BEEN LESS OF A PROBLEM
                  TO MAINTAIN.

                  THE SLUDGE PUMPS HAVE BEEN A PROBLEM.  THE PUMPS REQUIRE AN OVERHAUL
                  EVERY 1000 HOURS AND HAVE FREQUENT VALVE FAILURES.  NEW VALVE MANIFOLDS MAY
                  BE INSTALLED TO IMPROVE PUMP SERVICE BY ALLOWING ACCESS TO INDIVIDUAL BALL
                  VALVES.

SYSTEM       98.6       100.0                    73.1                  744   544    544

SYSTEM       98.4       100.0                    74.9                  696   521    521

** PROBLEMS/SOLUTIONS/COMMENTS

                  NO MAJOR FGD-RELATED PROBLEMS OCCURRED DURING JANUARY AND FEBRUARY.

SYSTEM       98.8       100.0                    72.6                  744   540    540

»* PROBLEMS/SOLUTIONS/COMMENTS

                  THE BOILER WAS OUT OF SERVICE ONE WEEK IN MARCH DUE TO A PLUGGED AIR
                  PREHEATER.  NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED FOR MARCH.
 4/80

 5/80

 6/80
SYSTEM

SYSTEM

SYSTEM
             91.1
                               100.0
                                                       81.4
                                                          720

                                                          744

                                                          720
                                                                                    586
                                                                                           586
                                             13-865

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)
	___	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION FOR THE MONTHS OF MAY AND JUNE IS NOT YET AVAILABLE.

 7/80  SYSTEM      98.4       100.0                    85.9                  744   639    639

 8/80  SYSTEM      98.9       100.0                    55.4                  744   412    412

 9/80  SYSTEM      95.3       100.0                    74.0                  720   533    533

10/80  SYSTEM      98.3       100.0                    28.1                  744   209    209

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         ON OCTOBER 10 THE UNIT MAS TAKEN OUT OF SERVICE FOR A TURBINE OVERHAUL.
                         DURING THIS OUTAGE THE UTILITY COMMENCED THE INSTALLATION OF A MANIFOLD
                         SYSTEM IN THE STACK.  THE OUTAGE IS SCHEDULED TO LAST APPROXIMATELY 12
                         WEEKS.

11/80  SYSTEM         .0                                  .0                  720     0      0

12/80  SYSTEM         .0                                  .0                  744     0      0

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE YEAR MINOR EROSION PROBLEMS WITH THE ID FAN ROTORS WERE EN-
                         COUNTERED.  FOUR OF THE SIX ID FAN ROTORS HAVE BEEN REPAIRED.

                         BRUCE MANSFIELD 1 REMAINED OFF LINE DURING NOVEMBER AND DECEMBER AS A
                         RESULT OF THE TURBINE OVERHAUL.

 1/81  SYSTEM                                                                672

 2/81  SYSTEM                                                                672

 3/81  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FIRST QUARTER 1981 THE UTILITY REPORTED THAT THE FGD SYSTEM
                         AVAILABILITY WAS 99.13X.

 4/81  SYSTEM                                                                720

 5/81  SYSTEM                                                                744

 6/81  SYSTEM      99.9                                                      720   457

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         MINOR UNIT OUTAGES OCCURRED DURING THE SECOND QUARTER DUE TO BOILER TUBE
                         LEAKS.  THE UTILITY REPORTED THAT THE YEAR TO DATE UNIT AVAILABILITY WAS
                         69.82X.

                         DURING THE SECOND QUARTER NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED.
                         THE UTILITY REPORTED THAT THE YEAR TO DATE FGD SYSTEM AVAILABILITY WAS
                         99.OX.

 7/81  SYSTEM

 8/81  SYSTEM      97.0

 9/81  SYSTEM      98.7                                                      720
                                             13-866

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       *» PROBLEMS/SOLUTIONS/COMMENTS

                         OVERALL FGD SYSTEM AVAILABILITY WAS NOT REPORTED FOR THE MONTH OF JULY.
                         THE MAJOR PROBLEM ENCOUNTERED DURING THE THIRD QUARTER WAS MIST ELIMINATOR
                         BUILDUP MAKING CLEANING NECESSARY.

                         THE YEAR TO DATE AVAILABILITY OF THE FGD SYSTEM (THROUGH AUGUST) WAS
                         REPORTED TO BE 98.5X.

10/81  SYSTEM      99.5                                                      744

11/81  SYSTEM      97.5                                                      720

12/81  SYSTEM      99.0                                                      744

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         MIST  ELIMINATOR CLEANING CONTINUED TO BE A PROBLEM DURING THE FOURTH
                         QUARTER.

  1/82  SYSTEM      97.8                                                      744

  2/82  SYSTEM      99.4                                                      672

  3/82  SYSTEM      99.6                                                      744

       »» PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT  FGD SYSTEM PERFORMANCE WAS OUTSTANDING FOR THE
                         FIRST QUARTER  1982.
4/82






5/62






6/82






A
B
C
D
E
F
SYSTEM
A
B
C
D
E
F
SYSTEM
A
B
C
D
E
F
SYSTEM
99.9
97.4
99.6
99.5
99.9
94.9
98.5
100.0
100.0
86.7
97.2
85.7
99.2
94.8
98.6
90.8
93.1
93.9
99.0
97.5
95.5
                               100.0                    99.9                  720    719    719  72.1
                               100.0                   100.0                  744    744     744   75.4
                               100.0                   100.0                  720   720    720  72.3

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                          DURING THE SECOND QUARTER OF 1982.

  7/82  A           99.0
        B          100.0
                                             13-867

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWERS BRUCE MANSFIELD 1 (CONT.)
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION X REMOVAL PER
S02 PART. HOURS
C
D
E
F
SYSTEM
8/82 A
B
C
0
E
F
SYSTEM
96.7
100.0
100.0
97.8
98.9 100.0 77.8 7*4
100.0
98.2
98.6
96.2
99.2
80.3
95.* 100.0 100.0 744
BOILER FGD CAP.
HOURS HOURS FACTOR




579 579 54.6






744 744 69.3
** PROBLEMS/SOLUTIONS/COMMENTS

9/82 A
B
C
0
E
F
SYSTEM
NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED DURING JULY
9.8
9.8
9.8
9.8
9.3
9.8
9.7 100.0 9.7 720
AND AUGUST 1982.






70 70 5.4
** PROBLEMS/SOLUTIONS/COMMENTS

10/82 A
B
C
0
E
F
SYSTEM
A SCHEDULED BOILER OUTAGE COMMENCED ON SEPTEMBER 3.
50.1
49.2
50.1
50.1
49.0
44.6
48.9 100.0 47.8 744







356 356 22.9
** PROBLEMS/SOLUTIONS/COMMENTS

11/82 A
B
C
0
E
F
SYSTEM
12/82 A
B
C
D
E
F
SYSTEM
THE SCHEDULED BOILER OUTAGE ENDED ON OCTOBER 15.
100.0
100.0
100.0
100.0
100.0
83.4
97.2 100.0 86.4 720
100.0
95.1
100.0
95.3
95.3
100.0
97.6 100.0 78.1 744







622 622 58.3






581 581 43.6
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED DURING NOVEMBER AND DECEMBER
                         1982.
 1/83  A
                   93.3
                                            13-843

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
       B
       C
       D
       E
       F
       SYSTEM

 2/83  A
       B
       C
       0
       E
       F
       SYSTEM

 3/83  A
       B
       C
       D
       E
       F
       SYSTEM
 98.7
 98.4
100.0
 89.9
 89.9
 95.1
100.0
                                    100.0
                                               744   744
                  62.3
100
 90
 93
100
 92.0
 94.2
 95.0
100.0
 97.9
100.0
 89.9
100.0
100.0
 98.0
            100.0
                              100.0
                        100.0
                           .0
                         94.1
                                                           672   672
             672  65.3
744   700
                                                                                          700  61.5
       «» PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY REPORTED THAT NO MAJOR FGD-REUTED PROBLEMS WERE ENCOUNTERED
                         DURING THE FIRST QUARTER OF 1983.
4/83






5/83






6/83






A
B
C
D
E
F
SYSTEM
A
B
C
D
E
F
SYSTEM
A
B
C
D
E
F
SYSTEM
99.9
99.9
99.6
99.9
99.9
99.9
99.8
94.9
100.0
100.0
100.0
92.1
100.0
97.8
100.0
99.5
100.0
85.9
100.0
100.0
97.6
                              100.0
                                                       87.8
                                                           720   632
                                                            632   54.4
                              100.0
                                                      100.0
                                                           744   744
                                                            744  56.5
                               100.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                                                       65.1
                                                                             720   469
                                                                        469  40.9
                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE SECOND QUARTER OF 1983.
7/83 A
B
C
D
E
F
SYSTEM
100.0
100.0
100.0
99.6
100.0
99.2
99.8
91.0
88.6
87.6
89.8
92.4
87.4
89.5
91.0
88.6
87.6
89.8
92.4
87.4
89.5
90.2
87.8
86.8
89.0
91.5
86.6
88.6
                                                                             744   737
                                                                                          660  64.0
                                             13-869

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR
 11/83
 12/83
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY REPORTED THAT NO MAJOR FGD-REUTED PROBLEMS WERE  ENCOUNTERED
                         DURING THE THIRD QUARTER OF 1983.
8/83






9/83






A
B
C
D
E
F
SYSTEM
A
B
C
D
E
F
SYSTEM
100.0
99.0
99.9
93.5
91.2
107.1
93. 4
100.0
93.9
90.6
95.7
100.0
100.0
96.7
88.3
92.8
88.8
88.8
79.6
87.0
87.6
94.3
79.2
46.7
73.2
94.0
91.1
79.7
88.4
92.9
88.8
88.8
79.7
87.0
87.6
94.3
79.2
46.7
73.2
94.0
91.1
79.7
79.0
83.1
79.4
79.4
71.2
77.8
78.3
94.3
79.2
46.7
73.2
94.0
91.1
79.7
                                                                             744   666
                                                           583  54.3
                                                                             720   720
                                                           574  58.2
10/83  A
A
B
C
D
E
F
SYSTEM
22.1
21.8
22.1
.0
22.1
22.1
18.3
87.7
70.0
68.2
.0
90.1
78.6
65.8
87.7
70.0
68.2
.0
90.1
78.6
65.8
19.4
15.5
15.1
.0
19.9
17.3
14.5
                                                                             744   164
                                                           108  11.0
       **  PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY REPORTED A SCHEDULED BOILER OUTAGE DURING OCTOBER.

                         MODIFICATIONS TO THE MODULE D INDUCED DRAFT FAN MOTOR AND MOTOR BASE WERE
                         MADE DURING OCTOBER.
A
B
C
D
E
F
SYSTEM
76.9
76.9
76.9
61.9
76.6
76.3
74.2
79.9
69.4
79.8
72.5
82.1
43.9
71.3
79.9
69.4
79.8
72.5
82.1
43.9
71.3
61.0
52.9
60.8
55.3
62.6
33.5
54.4
                                                                             720   549
                                                           391  41.5
       «*  PROBLEMS/SOLUTIONS/COMMENTS
                         THE SCHEDULED BOILER OUTAGE WHICH BEGAN IN OCTOBER ENDED ON NOVEMBER  7.
A
B
C
D
E
F
SYSTEM
99.2
100.0
100.0
99.1
99.5
100.0
99.6
67.1
55.1
85. 6
75.6
61.4
65.5
68.4
67.1
55.1
85.6
75.6
61.4
65.5
68.4
28.6
23.5
36.6
32.3
26.2
28.0
29.2
                                                                             744    318
                                                           217  19.9
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED  PROBLEMS WERE  ENCOUNTERED
                         DURING DECEMBER.
 1/84  A
                  100.0
76.4
                                           76.4
                                                       72.6
                                            13-870

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (CONT.)
PERIOD MODULE AVAILABILITY
B
C
D
E
F
SYSTEM
2/84 A
B
C
D
E
F
SYSTEM
3/84 A
B
C
0
E
F
SYSTEM
4/84 A
B
C
0
E
F
SYSTEM
5/84 A
B
C
D
E
F
SYSTEM
93.2
98.1
94.2
93.6
100.0
96.5
91.4
91.2
93.4
92.8
99.8
88.3
92.8
92.3
99.1
99.9
93.6
99.1
95.3
96.6
91.7
87.4
92.1
95.0
94.1
96.3
92.8
91.2
92.7
93.4
92.8
91.6
83.7
90.9
OPERABILITY
89.8
79.1
83.6
89.4
65.6
84.0
65.1
73.0
90.1
86.2
93.7
79.7
84.6
83.5
97.2
97.0
87.9
100.0
89.6
92.5
89.3
83.2
88.1
84.7
91.2
89.1
87.6
81.6
77.2
92.5
92.1
84.5
69.8
82.9
RELIABILITY UTILIZATION X REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR
89.8
79.1
83.6
89.4
85.6
84.0
85.1
73.0
90.1
86.2
93.7
79.7
84.6
83.5
97.2
97.0
87.9
101.0
69.6
92.7
89.3
83.2
88.1
84.7
91.2
89.1
87.6
81.6
77.2
92.5
92.1
84.5
69.8
82.9
85.3
75.1
79.4
84.9
81.3
79.8
85.1
73.0
90.1
86.2
93.7
79.7
84.6
81.3
94.6
94.5
85.6
98.4
87.2
90.3
83.8
78.1
82.6
79.4
85.6
83.6
62.2
81.6
77.2
92.5
92.1
84.5
69.8
82.9





744 707 594 58.1






696 696 589 71.2






744 725 672 78.9






720 675 592 65.6






744 744 617 72.3
  6/84
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         NO MAJOR FGD RELATED PROBLEMS MERE REPORTED DURING THE PERIOD OF JANUARY
                         THROUGH MAY 1984.
94.1
68.3
90.4
99.1
99.1
45.9
86.1
89.5
85.6
88.4
92.8
86.7
48.0
81.8
89.5
85.6
88.4
92.8
86.7
48.0
81.8
79.2
75.7
78.2
82.1
76.7
42.5
72.4
       A
       B
       C
       D
       E

       SYSTEM
       ** PROBLEMS/SOLUTIONS/COMMENTS
720   637
             521  60.0
                         THE MODULE F INDUCED DRAFT FAN MOTOR AND BASE UNDERWENT MODIFICATIONS
                         DURING JUNE.
7/84 A
B
C
D
E
F
SYSTEM
99.7
95.2
89.7
93.1
93.4
91.8
93.8
92.1
88.2
72.9
81.0
76.7
78.7
81.6
92.1
88.2
72.9
81.0
76.7
78.7
81.6
91.7
87.8
72.6
80.6
76.3
78.4
61.2
                                                                             744   741
                                                                                          604  64.8
                                             13-871

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 1 (COHT.)
_	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                              X REMOVAL   PER  BOILER  FGD   CAP.
                                              S02  PART. HOURS HOURS  HOURS FACTOR
 8/84
       A
       B
       C
       D
       E
       F
       SYSTEM
 91.7
 92.5
 93.0
 98.2
 98.4
100.0
 95.6
90.9
60.0
87.7
77.6
94.0
98.1
88.1
       ** PROBLEMS/SOLUTIONS/COMMENTS
90.9
80.0
87.7
77.6
94.0
98.1
88.1
86.6
76.2
83.5
73.9
89.5
93.4
83.8
                                                                             744   708
                                                                                          624  65.3
                         NO MAJOR FGD RELATED PROBLEMS WERE REPORTED DURING JULY AND AUGUST, 1984.

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR SEPTEMBER 1984.
                                            13-872

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY M/F6D - MW
NET UNIT GENERATING CAPACITY WO/FGD - MM
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 *» FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - X
     RANGE MOISTURE CONTENT - X
     AVERAGE SULFUR CONTENT - X
     RANGE SULFUR CONTENT - X
     AVERAGE CHLORIDE CONTENT - X
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
     NUMBER
     TYPE

 ** ESP
     NUMBER
     TYPE

 ** PARTICLE SCRUBBER
     NUMBER
     NUMBER OF SPARES
     INITIAL START-UP DATE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - LITER/CU.M
     PH CONTROL ADDITIVE
     PRESSURE DROP - KPA
     SUPERFICIAL GAS VELOCITY - M/S
PENNSYLVANIA POWER
BRUCE MANSFIELD
2
SHIPPINGPORT
PENNSYLVANIA
C
   15.         (   .035 LB/MMBTU)
  258.         (   .600 LB/MMBTU)
******         (****** LB/MMBTU)
 2360
  917
  780
  818
  917
FOSTER WHEELER
PULVERIZED COAL
BASE
 1580.86
  140.6
  290.
CONCRETE
    5.9
               (3350000 ACFM)
               (  285 F)
               (  950 FT)

               (  19.2 FT)
               (  12000 BTU/LB)
                ******
COAL
BITUMINOUS
27912.

   12.80
8.0-15.0
    7.00
5.5-8.5
    3.50
3.0-4.0
********
******
 0
NONE
 0
NONE
 6
 0
 7/77
VENTURI TOWER
FIXED-THROAT/TOP-ENTRY PLUMB BOB
N/A
GE ENVIRONMENTAL SERVICES
35.5 OIA X 52.0
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER
NONE
 I
 1258.2        (19971 GPM)
    4.8        (35.8 GAL/1000ACF)
THIOSORBIC LIME
    4.7        (19.0 IN-H20)
   61.0        (  200.0 FT/S)
                                            13-873

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 2 (CONT.)

     INLET GAS FLOW RATE - CU.M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICENCY - X
     PARTICLE REMOVAL EFFICIENCY - X

*** FGD SYSTEM
 #* GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X
     DESIGN COAL HEAT CONTENT - J/G
     DESIGN COAL ASH CONTENT - X
     OPER. i MAINT. REQUIREMENT - MANHR/DAY

 ** QUENCHER/PRESATURATOR
     NUMBER

 »» ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     MANUFACTURER
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     DISTANCE BETWEEN VANES - CM
     VANE ANGLES - DEGREES
   263.3
   140.6
    70.0
    99.8
(  558000 ACFM)
(   285 F)
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIME
 MAG
 GE ENVIRONMENTAL SERVICES
 GILBERT/COMMONWEALTH ASSOCIATES
 FULL SCALE
 NEW
X   99.80
    92.10
     4.1
  1
 10/77
  7/77
 10/74
     4.70
 27679.4
    19.70
   214.0
(  11900 BTU/LB)
  6
  0
 VENTURI TOWER
 FIXED THROAT
 N/A
 GE ENVIRONMENTAL SERVICES
 34.0 DIA X 51.5
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 GLASS FLAKE-FILLED POLYESTER
 RIGIFLAKE 4850
 NONE
  1
  1112.
     5.5
     1.5
    30.5
   201.31
    52.8
    92.1
(17650 GPM)
(  41.4 GAL/1000 ACF)
(  6.0 IN-H20)
(100.0 FT/S)
(  426600 ACFM)
(   127 F)
 PRIMARY COLLECTOR
  6
  0
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 HEIL PROCESS EQUIPMENT
 HORIZONTAL
     1
     4
     7.6        ( 3.00 IN)
   90
                                             13-874

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PENNSYLVANIA POWER: BRUCE MANSFIELD 2 (CONT. )

     PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH FREQUENCY
     WASH RATE - L/S

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     SEAL AIR FLOW - CU. M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     SEAL AIR FLOW - CU. M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     SEAL AIR FLOW - CU. M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE
     .1        (   .6 IN-H20)
    3.0        (10.0 FT/S)
ORGANIC
POLYPROPYLENE
THICKENER OVERFLOW
ONCE EVERY 12 MINUTES
    3.8        (    60 GAL/MIN)
 6
 0
CENTRIFUGAL
GREEN FUEL ECONOMIZER
UNIT
FORCED DRAFT
WET
  263.32
   47.8
   18.9
               (  558000 ACFM)
               (   118 F)
               (62.0 IN-H20)
CARBON STEE;; HIGH ALLOY; HIGH ALLOY;  HIGH ALLOY
SHUT-OFF
BUTTERFLY
N/A
MOSSER
     .00       (
STAINLESS STEEL
AUSTENITIC
NONE
N/A
                      0 ACFM)
                      0 ACFM)
                      0 ACFM)
 6
NONE
LOUVER
NR
MOSSER
     .00       (
STAINLESS STEEL
AUSTENITIC
NONE
N/A
 6
CONTROL
LOUVER
NR
GREEN FAN
     .00       (
STAINLESS STEEL
AUSTENITIC
NONE
N/A
INLET
CARBON STEEL
AISI 1110
NONE
N/A
OUTLET TO INOPERABLE REHEATER
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER
                                            13-675

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 2 (CONT.)
 «* DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER
     FULL LOAD DRY FEED CAPACITY - M.TONS/HR
     PRODUCT QUALITY - 7. SOLIDS

 »* TANKS
     SERVICE
     SCRUBBER RECYCLE
     ABSORBER RECYCLE
     THICKENER OVERFLOW
     CALCILOX ADDITION [MIX]
     SLAKER TANK
     SLURRY STORAGE

 ** PUMPS
     SERVICE
     VENTURI RECIRCULATION
     SLURRY FEED
     LIME SLURRY RECIRCULATION
     ABSORBER RECIRCULATION
     THICKENER UNDERFLOW
     THICKENER CLEAR WATER TRANSFER
     SLUDGE

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     CONFIGURATION
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

 *»* SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS
     INLET QUALITY - 7.

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT
     SITE DIMENSIONS
OUTLET FROM INOPERABLE REHEATER
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER
SLAKER
DETENTION
N/A
DORR-OLIVER
 Z
   20.0        (  22 TPH)
   13.5
NUMBER

   6
   6
   1
   3
   2
   1
NUMBER

  12
   4
   4
  12
   4
   4
****
THICKENER
 1
0
CYLINDRICAL
200.0 DIA
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER [WALLS]; MAT-REINFO
PARTICLE SCRUBBER BLEED
10X SOLIDS
30X SOLIDS
SLUDGE TREATMENT
PARTICLE SCRUBBER RECYCLE LOOP
FIXATION
MIX TAW
DRAVO tCALCILOX]
   30.0
FINAL
POND
OFF-SITE
PIPELINE
NONE
1300-1400 ACRES
                                            13-876

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PENNSYLVANIA POWER: BRUCE MANSFIELD 2 (CONT. )

     SITE CAPACITY - CU.M
     SITE SERVICE LIFE - YRS

 ** PROCESS CONTROL AND INSTRUMENTATION
     PROCESS STREAM
     CHEMICAL PARAMETERS
     CONTROL LEVELS
     MONITOR TYPE
     MONITOR LOCATION
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE

 ** WATER BALANCE
     WATER LOOP TYPE
     RECEIVING WATER STREAM

 ** CHEMICALS AND CONSUMPTION
     FUNCTION
     NAME
     PRINCIPAL CONSTITUENT
     SOURCE/SUPPLIER
     UTILIZATION - X
     POINT OF ADDITION

 ** FGD SPARE CAPACITY INDICES
     SCRUESER - X
     ABSORBER - X
     MIST ELIMINATOR - X
     FAN - X
     THICKENER - X

 ** FGD SPARE COMPONENT INDICES
     SCRUBBER
     ABSORBER
     MIST ELIMINATOR
     FAN
     THICKENER
                                59937000
                               25
                                 (  49000.0 ACRE-FT)
                              INLET SLURRY TO SCRUBBER  t  ABSORBER
                              PH
                              PH  7
                              UNILOCK
                              SPRAY HEADERS
                              AUTOMATIC
                              FEEDBACK
                              OPEN
                              OHIO RIVER
                              ABSORBENT
                              THIOSORBIC LIME
                              90X CAO MIN.,  2-6X MGO,  MAX.  4X ACID  INSOLUBLES
                              DRAVO
                                 84.0
                              SLAKER
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                              7. REMOVAL   PER   BOILER   FGD   CAP.
                                              S02  PART.  HOURS  HOURS   HOURS  FACTOR
10/77






2A
2B
2C
2D
2E
2F
SYSTEM
94.0
97.0
98.0
63.0
66.0
61.0
79.8
100.0
100.0
100.0
61.0
59.0
51.0
78.5
83.0
88.0
87.0
48.0
47.0
41.0
65.7






744 595 489
       ** PROBLEMS/SOLUTIONS/COMMENTS
 11/77  2A
       2B
       2C
       2D
       2E
100.0
 96.0
 88.0
 47.0
 55.0
                          UNIT 2 WAS DECLARED AVAILABLE FOR COMMERCIAL OPERATION AT 825 MW ON
                          OCTOBER 1, 1977.

                          THE SPRAYS IN THE 2F FAN WERE CLEANED.

                          REPAIRS WERE MADE TO THE 2B FLUE STACK LINING BECAUSE OF PREMATURE
                          FAILURE OF SEVERAL TEST PATCHES.

                          THE UNIT TRIPPED DUE TO FAULTY GENERATOR CONTROL TRANSFORMERS.
100.0
100.0
 92.0
 57.0
 52.0
83.0
81.0
74.0
46.0
42.0
                                             13-877

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
  1/78
  3/78
       2F
       SYSTEM
47.0
72.2
42.0
73.8
34.0
60.0
720   581
432
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          PROBLEMS ASSOCIATED WITH THE STATION POWER TRANSFORMERS CAUSED LIMITATION
                          IN LOAD ON UNIT 2.  THREE OF THE SIX STATION POWER TRANSFORMERS FOR UNIT
                          2 WERE DESTROYED.
12/77






2A
2B
2C
20
2E
2F
SYSTEM
74.0
99.0
98.0
100.0
89.0
99.0
93.2
77.0
100.0
100.0
100.0
85.0
93.0
92.5
                                                       63.0
                                                       86.0
                                                       83.0
                                                       86.0
                                                       69.0
                                                       76.0
                                                       77.2
                                                          744   607
                                                                       574
       **  PROBLEMS/SOLUTIONS/COMMENTS
2A
2B
2C
20
2E
2F
SYSTEM
95.0
100.0
96.0
94.0
99.0
99.0
97.2
58.0
100.0
56.0
100.0
100.0
96.0
85.0
                          COLD WEATHER CAUSED SOME FREEZING PROBLEMS WITH PROCESS PIPING.
                                                       31.0
                                                       76.0
                                                       29.0
                                                       70.0
                                                       64.0
                                                       50.0
                                                       53.3                  744   391    397
        *#  PROBLEMS/SOLUTIONS/COMMENTS
                          THE UNIT TRIPPED SEVERAL TIMES DUE TO DIFFICULTIES IN BURNING WET STOCK-
                          PILE COAL.  WHEN THE UNIT WAS ON LINE DURING THIS MONTH, THE WET COAL ALSO
                          PREVENTED FULL LOAD OPERATION OF COAL MILLS.
  2/78   2A
                   84.0
       BOILER CONTROL VALVE ("W"
       DIFFICULTIES.

            46.0
28
2C
2D
2E
2F
SYSTEM
87.0
89.0
97.0
99.0
78.0
89.0
68.0
88.0
71.0
99.0
78.0
75.0
                                                    VALVE) PROBLEMS COMPOUNDED START-UP
                                                       48.0
                                                       68.0
                                                       88.0
                                                       71.0
                                                       99.0
                                                       78.0
                                                       75.3                  672   672
                                                                                          506
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          MANY PROBLEMS OCCURRED WITH ID FAN COOLERS DUE TO INCLEMENT WEATHER.
2A
2B
2C
2D
2E
2F
SYSTEM
100.0
93.0
13.0
95.0
95.0
97.0
82.2
100.0
91.0
10.0
100.0
96.0
99.0
62.7
                                                       67.0
                                                       60.0
                                                       13.0
                                                       68.0
                                                       64.0
                                                       65.0
                                                       56.2
                                                                             744   494
                                                                                          418
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          EXTENSIVE ID FAN HOUSING REPAIRS WERE PERFORMED ON THE  2C  FAN.

                          A BOILER TUBE LEAK CAUSED SEVERAL DAYS OUTAGE.
                                            13-878

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PENNSYLVANIA POWER: BRUCE MANSFIELD 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
4/78






2A
2B
2C
2D
2E
2F
SYSTEM
100.0
100.0
59.0
15.0
14.0
13.0
50.2
82.0
82.0
59.0
15.0
14.0
13.0
44.2
81.0
61.0
59.0
15.0
14.0
13.0
43.8






720 713 315
 5/78
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          FLUE  LINING REPAIRS ON THE 2B CHIMNEY BEGAN ON APRIL 5.

                          EXTENSIVE REPAIRS MERE MADE ON THE 2C ID FAN, CAUSING IT TO BE DOWN FROM
                          MARCH 6 THROUGH APRIL 13.
       2A
       ZB
       2C
       ZO
       ZE
       2F
       SYSTEM
100.0
100.0
100.0
   .0
   .0
   .0
 50.0
    100.0
    100.0
    100.0
       .0
       .0
       .0
     50.0
37.0
37.0
37.0
  .0
  .0
  .0
18.5
744   270
             138
       »* PROBLEMS/SOLUTIONS/COMMENTS
                           THE  UNIT MAS OFF-LINE  FOR THREE WEEKS FOR REPAIRS TO THE 2C ID FAN,
                           INCLUDING COVERING  THE HOUSING WITH INCOLOY 825.

                           2B STACK LINING REPAIRS CONTINUED.
  6/78   2A
        2B
        2C
        20
        2E
        2F
        SYSTEM
 70.0
 69.0
 66.0
   .0
   .0
   .0
 34.2
    100.0
    100.0
    100.0
       .0
       .0
       .0
     50.0
70.0
69.0
66.0
  .0
  .0
  .0
34.2
720   417
246
       **  PROBLEMS/SOLUTIONS/COMMENTS
  7/78   SYSTEM

  8/78   SYSTEM

  9/78   SYSTEM

 10/78   SYSTEM

 11/78   SYSTEM

 12/78   SYSTEM
 99.3
2B STACK LINING REPAIRS CONTINUED.

-NOTE: AN ATTEMPT is ALWAYS MADE TO BEGIN OPERATION OF THE BOILER AND FGD
       SYSTEM SIMULTANEOUSLY AT BRUCE MANSFIELD.   OCCASIONALLY PROBLEMS
       DELAY BOILER START-UP, MAKING IT POSSIBLE  FOR MONTHLY FGD MODULE
       HOURS TO EXCEED ACTUAL BOILER HOURS.

                                                   744

                                                   744

                                                   720

                                                   744   144

                                                   720

                                                   744
                                             13-879

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER

PENNSYLVANIA POWER: BRUCE MANSFIELD 2 (CONT.)
---------- . -------------------------------- PERFORMANCE DATA ------------------------------------------
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGO   CAP.
                                                                SOS  PART. HOURS HOURS  HOURS FACTOR


       *» PROBLEMS/SOLUTIONS/COMMENTS

                          NO INFORMATION WAS AVAILABLE FOR THIS PERIOD.

 1/79  SYSTEM                                                                744

 2/79  SYSTEM                                                                672

 3/79  SYSTEM                                                                744

 4/79  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO INFORMATION WAS REPORTED FOR THIS PERIOD BY THE UTILITY.

 5/79  SYSTEM                                                                744

 6/79  SYSTEM                                                                720

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE AVAILABILITY FOR JANUARY 1, 1979 THROUGH
                         MAY 31, 1979 WAS 88. 8X.

                         THE UTILITY REPORTED THAT SOME FAN PROBLEMS WERE RECENTLY ENCOUNTERED.

       SYSTEM                                                                744

       SYSTEM                                                                744

       SYSTEM                                                                720

       #* PROBLEMS/SOLUTIONS/COMMENTS

                         CHIMNEY LINING WORK (APPLICATION OF CXL 2000) WAS COMPLETED IN EARLY 1979.

                         FAN HOUSING WORK (CHANGING FROM LINED CARBON STEEL TO INCOLLOY 825) IS
                         CONTINUING .

                         NEW PH MONITOR MODIFICATIONS HAVE YIELDED PROMISING RESULTS WITH RESPECT
                         TO MONITOR AVAILABILITY.

                         THE FGD SYSTEM ATTRIBUTED 10. 8X OF THE TOTAL UNIT UNAVAILABILITY FOR 1979
                         TO DATE.  THE BREAKDOWN IS AS FOLLOWS:
                              5. OX CHIMNEY (FINISHED CXL 2000 APPLICATION)
                              1.3X GENERAL SCRUBBER PROBLEMS AND MAINTENANCE
                              1.5X ID FAN WORK/PROBLEMS
                              2. OX MIST ELIMINATOR PLUGGING
                              l.OX EMISSION VIOLATION (CUT BACK OF BOILER LOAD BECAUSE OF LOW S02
                                   REMOVAL EFFICIENCY).
  7/79

  8/79

  9/79
10/79

11/79

12/79
SYSTEM

SYSTEM

SYSTEM
                   97.5

                  100.0

                   96.5
                                                                              720
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          DURING  THE  PERIOD AN  ADDITIONAL  FAN HOUSING  WAS  REPLACED  WITH  THE NEW
                          INCOLLOY  825.   BY THE END  OF  1980  ALL  THE  FAN  HOUSINGS  WILL BE REPLACED
                          WITH  THE  NEW MATERIAL.
                                             13-680

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 2 CCONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         WHERE THE NEW PH MONITORS HAVE BEEN INSTALLED, PROBE MAINTENANCE
                         HAS BEEN CUT 80X, AND MIST ELIMINATOR MAINTENANCE HAS BEEN LESS OF A
                         PROBLEM.

                         THE SLUDGE PUMPS HAVE BEEN A PROBLEM.  THE PUMPS REQUIRE AN OVERHAUL
                         EVERY 1000 HOURS AND HAVE FREQUENT VALVE FAILURES.  NEW VALVE MANIFOLDS MAY
                         BE INSTALLED TO IMPROVE PUMP SERVICE BY ALLOWING ACCESS TO INDIVIDUAL
                         BALL VALVES.

 1/80  SYSTEM      97.1       100.0                    75.7                  744   563    563

 2/80  SYSTEM      94.7       100.0                    89.3                  696   622    622

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM EXPERIENCED NO MAJOR PROBLEMS DURING JANUARY AND FEBRUARY.

 3/80  SYSTEM      98.4       100.0                    47.4                  744   353    353

       »* PROBLEMS/SOLUTIOHS/COMMENTS

                         THE BOILER WAS OUT OF SERVICE 16 DAYS IN MARCH FOR A SCHEDULED BOILER
                         INSPECTION.  NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED.

 4/80  SYSTEM      89.5       100.0                    87.0                  720   626    626

 5/80  SYSTEM                                                                744

 6/80  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION FOR THE MONTHS OF MAY AND JUNE IS NOT YET AVAILABLE.

 7/80  SYSTEM      95.4       100.0                    76.8                  744   571    571

 8/80  SYSTEM      93.9       100.0                    74.1                  744   551    551

 9/80  SYSTEM      97.9       100.0                    75.1                  720   541    541

 10/80  SYSTEM      97.2       100.0                    90.3                  744   672    672

 11/80  SYSTEM      97.2       100.0                    82.5                  720   594    594

 12/80  SYSTEM      97.9       100.0                    68.1                  744   507    507

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         DURING  A TURBINE OVERHAUL OF UNIT 1, A MANIFOLD SYSTEM WAS BEING INSTALLED
                         IN THE  STACK.  UNIT 2 IS SCHEDULED TO BE SHUTDOWN IN  LATE 1981 OR  EARLY
                         1982 SO THAT THE MANIFOLD SYSTEM CAN BE COMPLETED.  DURING THIS OUTAGE
                         THE ID  FAN ROTORS, WHICH HAVE ERODED, ARE SCHEDULED TO BE REPLACED.

 1/81  SYSTEM                                                                744

 2/81  SYSTEM                                                                672

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS TAKEN OUT OF SERVICE ON FEBRUARY 28, 1981 FOR A SCHEDULED
                         FOUR WEEK OUTAGE.

 3/81  SYSTEM                                                                744
                                             13-881

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 2 (CONT.)
	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER  FGD    CAP.
                                                                S02   PART. HOURS  HOURS  HOURS FACTOR


       *# PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FIRST QUARTER 1981 THE UTILITY REPORTED  THAT  THE  FGD SYSTEM
                         AVAILABILITY WAS 97.37X.

 4/81  SYSTEM                                                                 720

 5/81  SYSTEM                                                                 744

 6/81  SYSTEM      99.8                                                       720    590

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MINOR UNIT OUTAGES OCCURRED DURING THE SECOND QUARTER DUE  TO BOILER  TUBE
                         LEAKS.  THE UNIT WAS ALSO DOWN DURING PART OF THE QUARTER  DUE TO LOW LOAD
                         REQUIREMENTS.  THE UTILITY REPORTED THAT THE YEAR TO DATE  UNIT AVAILABILITY
                         WAS 72.9X.

                         DURING THE SECOND QUARTER NO MAJOR FGD-RELATED  PROBLEMS  WERE ENCOUNTERED.
                         THE UTILITY REPORTED THAT THE YEAR TO DATE FGD  SYSTEM AVAILABILITY WAS
                         98.2/i.

 7/81  SYSTEM                                                                 744

 8/81  SYSTEM      96.7                                                       744

 9/81  SYSTEM      96.3                                                       720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         OVERALL FGD SYSTEM AVAILABILITY WAS NOT REPORTED FOR THE MONTH OF JULY.
                         THE MAJOR PROBLEM ENCOUNTERED DURING THE THIRD  QUARTER WAS MIST ELIMINATOR
                         BUILDUP MAKING CLEANING NECESSARY.

                         DURINS SEPTEMBER THE UTILITY REPORTED PROBLEMS  WITH THE  ID FAN SPRAYS
                         PLUGGING.

                         THE YEAR TO DATE AVAILABILITY OF THE FGD SYSTEM (THROUGH AUGUST) WAS
                         REPORTED TO BE 97.9X.

 10/81  SYSTEM      98.0                                                       744

 11/81  SYSTEM      94.2                                                       720

 12/81  SYSTEM      94.8                                                       744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         AT THE END OF NOVEMBER THE BOILER WAS TAKEN  OFF-LINE FOR SCHEDULED MAINTEN-
                         ANCE.  DURING THIS TIME THE ID FAN MOTOR WAS REPLACED.   THE  OUTAGE  LASTED
                         FOR APPROXIMATELY TWO WEEKS WHICH INCLUDES SOME TIME IN  DECEMBER.

 1/82  SYSTEM      98.1

 2/82  SYSTEM      98.4                                                       672

 3/82  SYSTEM      99.3                                                       744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT FGD SYSTEM PERFORMANCE WAS OUTSTANDING FOR THE
                         FIRST QUARTER 1982.
                                             13-6*2

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PENNSYLVANIA POWER: BRUCE MANSFIELD 2 (CONT.)
PERIOD
4/82






5/82






6/82






	 PERFURHANCE DATA 	
MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION X REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HO'JRS HOURS FACTOR
A
B
C
D
E
F
SYSTEM
A
B
C
D
E
F
SYSTEM
A
B
C
D
E
F
SYSTEM
98.3
96.4
97.8
99.3
99.5
99.9
98.5 100.0
99.3
87.9
99.0
83.1
98.2
93.5
93.5 100.0
95.5
100.0
98.9
100.0
100.0
97.9
98.7 100.0






64.3 720 463 463 37.5






83.5 744 621 621 60.0






95.3 720 686 686 71.2
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY REPORTED THAT NO MAJOR FGO-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE SECOND QUARTER OF 1982.
7/82






8/82






9/82






A
B
C
D
E
F
SYSTEM
A
B
C
D
E
F
SYSTEM
A
B
C
D
E
F
SYSTEM
95.1
95.2
97.6
98.0
97.7
95.3
96.5
98.2
98.8
97.3
97.2
100.0
99.6
98.5
100.0
96.8
100.0
95.0
98.1
94.0
97.3
                              100.0
                                                      100.0
                                                                             744   744
                                                                            81.3
                              100.0
                                                       52.6
                                                          744   391
391  30.1
                              100.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                                                       77.8
                                                                             720   560
                                                                       560  48.5
                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE THIRD QUARTER OF 1982.
10/82  A
       B
       C
       D
99.1
98.3
98.2
96.9
                                            13-883

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 2 (CONT.)
_	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                              V. REMOVAL   PER  BOILER  FGD   CAP.
                                              S02  PART. HOURS HOURS  HOURS FACTOR
       E
       F
       SYSTEM
  3/83
 98.5
 95.9
 97.8
100.0
                         96.1
744   715
715  61.8
11/82  A
       B
       C
       D
       E
       F
       SYSTEM
 90.9
 99.1
 95.3
100.0
 93.1
100.0
 96.4
                              100.0
                         85.3
                                                                              720    614
             614  54.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         NO FGD-RELATED PROBLEMS WERE REPORTED DURING OCTOBER  AND  NOVEMBER  1982.
 12/82   A
        B
        C
        D
        E
        F
        SYSTEM
 41.7
 92.0
 98.4
 99.4
 95.0
 99.4
 87.6
                              100.0
                                                       91.9
                                                                              744   684
                                                            684  48.8
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         DURING DECEMBER REPAIRS WERE MADE ON THE  2A  ID  FAN.   MOTOR  MODIFICATIONS
                         WERE  PERFORMED AND THE J-BOLTS,  GROUTS, AND  SOLE  PLATES OF  THE MOTOR BASE
                         WERE  REPLACED.
  1/83  A
        B
        C
        D
        E
        F
        SYSTEM
  2/83  A
        B
        C
        D
        E
        F
        SYSTEM
 94.9
100.0
100.0
 99.8
 91.2
100.0
 97.6

100.0
 96.5
 95.5
 99.0
100.0
 90.0
 96.8
                               100.0
                                                       100.0
                                                                              744   744
                                                                                           744  60.9
                               100.0
                                                       100.0
                                                                              672   672
                                                                        672  64.6
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          NO  FGO-RELATED  PROBLEMS  WERE  REPORTED  DURING JANUARY AND FEBRUARY 1983.
        A
        B
        C
        D
        E
        F
        SYSTEM
 73.
  1.
  1.
 73.
 57.
 79.
                    47.6
                               100.0
                                                        79.4
                                                                              744   591
                                                                        591   34.7
        #« PROBLEMS/SOLUTIONS/COMMEHTS
                          A  SCHEDULED  TURBINE/GENERATOR  OUTAGE  COMMENCED ON MARCH 25.

                          DURING MARCH REPAIRS WERE  MADE ON THE 2B AND 2C ID FANS.   MOTOR MODIFICA-
                          TIONS  WERE PERFORMED AND THE J-BOLTS, GROUT, AND SOLE PLATE OF THE MOTOR
                                             13-884

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PENNSYLVANIA POWER: BRUCE MANSFIELD 2 (CONT.)
PERIOD

4/83






5/83






6/83






MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION X REMOVAL PER BOILER F6D CAP.
SOS PART. HOURS HOURS HOURS FACTOR

A
B
C
D
E
F
SYSTEM
A
B
C
0
E
F
SYSTEM
A
B
C
0
E
F
SYSTEM
BASE WERE REPLACED.
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
64.4
50.8
64.7
63.8
64.7
64.7
62. 2 100.0

.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0






50.7







720 0 0 .0






744 0 0 .0






720 365 365 29.6
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE SCHEDULED TURBINE/GENERATOR OUTAGE WHICH COMMENCED IN MARCH ENDED ON
                         JUNE  11.
7/83






A
B
C
D
E
F
SYSTEM
91.9
100.0
98.9
96.0
56.1
98.6
90.3
76.7
95.6
94.6
85.5
46.9
91.5
81.8
76.7
95.6
94.6
85.5
46.9
91.5
81.8
76.7
95.6
94.6
85.5
46.9
91.5
61.8
                                                                             744   744
                                                                                          609  66.2
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY REPORTED MODIFICATIONS TO THE MODULE
                         AND MOTOR BASE DURING JULY.
E INDUCED DRAFT FAN MOTOR
8/83






9/83






A
B
C
D
E
F
SYSTEM
A
B
C
D
E
F
SYSTEM
100.0
96.8
94.4
100.0
61.8
96.3
91.5
95.8
98.3
99.2
99.8
99.1
95.5
98.0
90.7
76.3
76.9
87.5
51.2
85.4
78.0
61.0
81.3
68.1
86.0
78.1
72.5
74.5
90.7
76.3
76.9
87.5
51.2
85.4
78.0
61.0
81.3
68.1
86.0
78.1
72.5
74.5
81.6
68.7
69.2
78.8
46.1
76.9
70.2
55.1
73.5
61.5
77. B
70.6
65.6
67.3
                                                                             744   669
                522  57.1
                                                                              720   651
                485  45.9
                                             13-885

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BPUCE MANSFIELD 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
7. REMOVAL   PER  BOILER  FGD   CAP.
S02  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING AUGUST AND SEPTEMBER 1983.
10/83






11/83






12/83






A
B
C
D
E
F
SYSTEM
A
B
C
D
E
F
SYSTEM
A
B
C
D
E
F
SYSTEM
100.1
95.8
95.7
98.6
96.2
94.7
96.8
99.0
98.4
97.2
94.6
99.8
98.4
97.9
98.7
98.8
99.6
100.0
95.6
100.0
98.8
77.5
96.5
74.0
72.3
81.5
68.8
78.4
84.5
79.4
71.0
81.6
77.2
68.1
76.9
79.2
73.4
80.4
69.5
80.6
86.1
78.2
77.5
96.5
74.0
72.3
61.5
68.8
78.4
84.5
79.4
71.0
81.6
77.2
68.1
76.9
79.2
73.4
80.4
69.5
80.6
86.1
78.2
68.8
85.8
65.7
64.2
72.4
61.2
69.7
80.7
75.8
67.8
77.9
73.8
65.0
73.5
77.0
71.4
78.2
67.6
78.4
83.7
76.1
                                                                             744   661
                          519  49.0
                                                                             720   688
                          529  61.2
                                                                             744   724
                          566  63.1
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED DURING THE FOURTH QUARTER OF
                         1983.
1/84






2/84






A
B
C
D
E
F
SYSTEM
A
B
C
D
E
F
SYSTEM
100.0
99.4
98.8
49.4
99.8
96.9
90.7
95.4
96.0
97.5
66.9
99.2
83.8
89.8
79.0
96.4
80.3
31.5
94.2
89.0
78.4
82.8
89.0
85.1
61.1
83.7
64.2
77.7
79.0
96.4
80.3
31.5
94.2
89.0
78.4
82.8
89.0
85.1
61.1
83.7
64.2
77.7
74.6
91.0
75.8
29.7
89.0
84.0
74.0
76.3
82.0
78.4
56.3
77. 2
59.2
71.6
                                                                             744   702
                          551  58.2
                                                                             696   641
                          498  56.6
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED DURING JANUARY AND FEBRUARY.
3/84 A
B
C
D
E
F
SYSTEM
100.0
98.1
95.0
100.0
95.6
25.5
85.7
93.8
95.4
94.4
89.1
93.3
26.1
82.0
93.8
95.4
94.4
89.1
93.3
26.1
82.0
93.8
95.4
94.4
89.1
93.3
26.1
82.0
                                                                             744   744
                                                                                          610   79.0
                                            13-886

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER
PENNSYLVANIA POHER: BRUCE MANSFIELD 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
X REMOVAL
SOS  PART.
 PER  BOILER  FGD   CAP.
HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         MODULE F UNDER UENT DRAFT FAN MOTOR AND BASE MODIFICATIONS AND MAS OUT OF
                         SERVICE PART OF THE MONTH.
4/84 A
B
D
E
F
SYSTEM
94.4
95.7
94.5
95.3
66.7
89.8
86.8
96.1
87.6
93.5
66.8
83.9
86.8
96.1
87.6
93.5
66.8
83.9
86.7
96.0
87.5
93.3
66.7
83.8 720





719
** PROBLEMS/SOLUTIONS/COMMENTS

5/84 A
B
C
0
E
F
SYSTEM

25.7
9.6
16.9
25.7
25.2
25.7
21.5
THE MODULE F
77.9
29.5
58.1
86.6
80.2
84.3
69.4
INDUCED DRAFT
77.9
29.5
58.1
86.6
80.2
84.3
69.4
MOTOR FAILED DURING APRIL, 1984
22.7
8.6
16.9
25.3
23.4
24.6
20.3 744
•






217
*» PROBLEMS/SOLUTIONS/COMMENTS

6/84 A
B
C
D
E
f
SYSTEM
7/84 B
C
D
E
F
SYSTEM
8/84 A
B
C
D
E
F
SYSTEM

88.4
88.9
89.7
88.1
88.5
89.4
88.8
95.9
97.8
93.5
97.7
101.4
97.2
97.1
99.2
97.1
99.4
94.9
95.3
97.2
A SCHEDULED
91.3
90.3
74.6
83.6
82.3
87.4
84.9
88.1
83.3
78.2
84.0
88.9
84.3
100.0
95.2
97.3
98.0
81.0
88.7
93.4
BOILER OUTAGE
91.3
90.3
74.6
83.6
82.3
87.4
84.9
88.1
83.3
78.2
84.0
88.9
84.3
103.2
95.2
97.3
98.0
81.0
88.7
93.9
STARTED ON MAY 11, 1984.
83.1
82.2
67.9
76.1
74.9
•79.6
77.3 720
83.1
78.5
73.7
79.2
83.7
79.5 744
84.9
78.4
80.1
60.6
66.7
73.0
77.3 744







655





701






612
                                                                                          603  77.6
                                                                                          151  16.4
                                                                                          557  66.0
                                                                                          591  64.3
                                                                                          575  58.0

        **  PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR  FGD RELATED  PROBLEMS MERE REPORTED DURING JULY AND AUGUST, 1984.
  9/84  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          INFORMATION MAS UNAVAILABLE  FOR SEPTEMBER 1984.
                                                                             720
                                             13-887

-------
UTILITY FGD SURVEY: OCTOBER 1933 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
502 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY M/FGD - MM
NET UNIT GENERATING CAPACITY WO/FGD - MM
EQUIVALENT SCRUBBED CAPACITY - MM
PENNSYLVANIA POMER
BRUCE MANSFIELD
3
SHIPPINGPORT
PENNSYLVANIA
C
32. ( .075
258. ( .600
301. ( .700
2360
917
800
828
917






LB/MMBTU)
LB/MMBTU )
LB/MMBTU )





  ** UNIT  DATA  - BOILER AND STACK
      BOILER  SUPPLIER
      BOILER  TYPE
      BOILER  SERVICE LOAD
      DESIGN  BOILER FLUE GAS  FLOW  - CU.M/S
      BOILER  FLUE  GAS  TEMPERATURE  - C
      STACK HEIGHT - M
      STACK SHELL
      STACK TOP DIAMETER - M

  ** FUEL  DATA
      FUEL TYPE
      FUEL GRADE
      AVERAGE HEAT CONTENT -  J/G
      RANGE HEAT CONTENT - BTU/LB
      AVERAGE ASH  CONTENT - 7.
      RANGE ASH CONTENT - 7.
      AVERAGE MOISTURE CONTENT - '/.
      RANGE MOISTURE CONTENT  - 7.
      AVERAGE SULFUR CONTENT  - 7.
      RANGE SULFUR CONTENT -  7.
      AVERAGE CHLORIDE CONTENT - 7.
      RANGE CHLORIDE CONTENT  - 7.

 **» PARTICLE CONTROL

  »* MECHANICAL COLLECTOR
      NUMEER
      TYPE

  »#  ESP
      NUMBER
      NUMBER  OF SPARES
      TYPE
      SUPPLIER
      INLET FLUE GAS CAPACITY - CU.M/S
      INLET FLUE GAS TEMPERATURE - C
      PRESSURE  DROP -  KPA
      PARTICLE  REMOVAL EFFICENCY - 7.

  ** PARTICLE SCRUBBER
      NUMBER
      GENERIC TYPE
      SPECIFIC  TYPE
      TRADE NAME/COMMON NAME
      SHELL GENERIC MATERIAL
      SHELL SPECIFIC MATERIAL
      LINER GENERIC MATERIAL
      LINER SPECIFIC MATERIAL
      GAS  CONTACTING DEVICE TYPE

 «** FGD SYSTEM
FOSTER WHEELER
PULVERIZED COAL
BASE
 1560.86
  140.6
  183.
CONCRETE
    5.9
(3350000 ACFM)
(  285 F)
(  600 FT)

(  19.2 FT)
(  12000 BTU/LB)
 ******
COAL
BITUMINOUS
27912.

   12.50
11.5-13.5
    7.00
5.5-8.5
    4.30
3.0-4.0
********
»****»
 0
NONE
COLD SIDE
LODGE-COTTRELL
  395.2        ( 837500 ACFM)
  140.6        (  285 F)
     .8        (  3. IN-H20)
   95.0
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                             13-888

-------
PENNSYLVANIA POWER: BRUCE MANSFIELD 3 (CONT.)
                                                  UTILITY F6D SURVEY:  OCTOBER 1983 - SEPTEMBER 1984
 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X
     DESIGN COAL HEAT CONTENT - J/G
     DESIGN COAL ASH CONTENT - X

 ** Q'JEHCHER/PRESATURATOR
     NUMBER

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUFERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     502 REMOVAL EFFICIENCY - X
     PARTICLE REMOVAL EFFICENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     MANUFACTURER
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIME
 NONE
 M.W. KELLOGG
 GILBERT/COMMONWEALTH ASSOCIATES
 FULL SCALE
 NEW
X   95.00
    92.20
     3.1
  1
 10/80
  6/80
  6/77
     4.75
 27679.4
    19.70
             (  11900  BTU/LB)
  5
  1
 SPRAY TOWER
 OPEN CROSSCURRENT SPRAY
 HORIZONTAL SPRAY CHAMBER
 PULLMAN KELLOGG
 32.5 WIDE X 15 HIGH X 112.8 LONG
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 GLASS FLAKE-FILLED POLYESTER
 FLAKELINE 103
 NONE
  6
  4158.         (66000 GPM)
    10
    5
   .4
  6.7
395.22
140.6
 92.5
 90.0
(  78.8 GAL/1000 ACF)
(  1.5 IN-H20)
(  22.0 FT/S)
(  837500 ACFM)
(   285 F)
 PRIMARY COLLECTOR
  5
  1
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 HEIL
 VERTICAL
     1
     3
     6.1
 ORGANIC
 POLYPHENYLENE
 THICKENER OVERFLOW
 NONE
 N/A
             (  20.0 FT/S)
                                            13-629

-------
UTILITY FED SURVEY: OCTOBER 1983 - SEPTEMBER

PENNSYLVANIA POWER: BRUCE MANSFIELD 3 (CONT.)

     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ## DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL  TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL  TYPE
    N/A
    NONE
    N/A
    CENTRIFUGAL
    WESTINGHOUSE
    UNIT
    FORCED  DRAFT
    DRY
    CARBON  STEEL
    SHUT-OFF
    GUILLOTINE
    NR
    STAINLESS STEEL
    AUSTENITIC
    NONE
    N/A
    SHUT-OFF
    GUILLOTINE
    NR
    STAINLESS STEEL
    AUSTENITIC
    NONE
    N/A
    SHUT-OFF
    GUILLOTINE
    NR
    STAINLESS STEEL
    AUSTENITIC
    NONE
    N/A
     8
    CONTROL
    LOUVER
    NR
    STAINLESS STEEL
    AUSTENITIC
    NONE
    N/A
    SHUT-OFF
    GUILLOTINE
    NR
    STAINLESS STEEL
    AUSTENITIC
    NONE
    N/A
    INLET UP TO DAMPER
    CAREON STEEL
    AISI 1110
    NONE
    N/A
13-890

-------
PENNSYLVANIA POWER: BRUCE MANSFIELD 3 (CONT.)
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK        N
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER

 ** TANKS
     SERVICE
     ABSORBER RECYCLE
     REAGENT PREP PRODUCT
     THICKENER OVERFLOW
     LIME TRANSFER
     FLY ASH t THICKENER UNDERFLOW

 ** PUMPS
     SERVICE
     SLURRY RECIRCULATION
     SLURRY TRANSFER FROM STORAGE TANK
     SLURRY TRANSFER FROM SLAKER
     THICKENER UNDERFLOW
     THICKENER OVERFLOW
     MIST ELIMINATOR WASH

 *» SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

 *** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS
     INLET QUALITY - X

 ** DISPOSAL
     NATUSE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT
     SITE DIMENSION'S
     SITE SERVICE LIFE - YRS
DAMPER TO ABSORBER
HIGH ALLOY
NICKEL BASE/CHROMIUM-IRON-MOLYBDENUM
NONE
N/A
OUTLET
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER
SLAKER
DETENTION
N/A
DORR OLIVER
                                                NUMBER
*»**
*«**
****
*«**
****
NUMBER

   6
****
****
«***
*#*»
****
THICKENER
 1
CARBON STEEL
AISI 1110
ORGANIC
NR
REACTION TANK BLEED
10X SOLIDS
30-402 SOLIDS
SLUDGE TREATMENT TANK
MIST ELIMINATOR WASH TANK
FIXATION
MIX TANK
DRAVO  tCALCILOXI
   10.0
FINAL
PON'D
OFF-SITE
PIPELINE
NONE
1300-1400 ACRES
 22
                                             13-891

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 3 (CONT.)
 ** PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     CONTROL LEVELS
     MONITOR LOCATION

 ** WATER BALANCE
     WATER LOOP TYPE
     RECEIVING WATER STREAM

 ** CHEMICALS AND CONSUMPTION
     FUNCTION
     NAME
     PRINCIPAL CONSTITUENT
     SOURCE/SUPPLIER
     POINT OF ADDITION

 ** FGD SPARE CAPACITY INDICES
     ABSORBER - X

 ** FGD SPARE COMPONENT INDICES
     ABSORBER
                                               PH
                                               PH  5.5 TO 6.5
                                               REACTION TANK
                                               OPEN
                                               OHIO RIVER
                                               ABSORBENT
                                               THIOSORBIC  LIME
                                               90X  CAO  MIN.,  2-6X MGO,  MAX.  4X ACID INSOLUBLES
                                               DRAVO
                                               SLAKER
                                                  25.0
                                                   1.0
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS   HOURS  FACTOR
 6/80  SYSTEM

       **  PROBLEMS/SOLUTIONS/COMMENTS
                                                                            720
                         INITIAL OPERATION OF THE FGD SYSTEM COMMENCED ON JUNE  9,  1980.  THE
                         UTILITY REPORTED THAT IT IS PRESENTLY IN THE PROCESS OF DEBUGGING THE
                         SYSTEM.

  7/80   SYSTEM                                                                744

  8/80   SYSTEM                                                                744

  9/80   SYSTEM      100.0       100.0                   100.0                  720    720    720

        **  PROBLEMS/SOLUTIONS/COMMENTS

                         COMMERCIAL OPERATION OF UNIT 3 COMMENCED ON SEPTEMBER  29,  1980.

 10/60   SYSTEM       89.1       100.0                    74.1                  744    551    551

 11/80   SYSTEM       90.3       100.0                    63.2                  720    455    455

 12/80   SYSTEM       91.1       100.0                    68.0                  744    506    506

        **  PROBLEMS/SOLUTIONS/COMMENTS

                         SINCE  STARTUP THE UTILITY HAS EXPERIENCED PROBLEMS WITH THE  CEILCOTE
                         LINER  WEARING ON THE ABSORBER WALLS.

                         PROBLEMS WITH MIST CARRYOVER HAVE RESULTED IN THE INSTALLATION OF BAFFLES
                         AT  THE MIST ELIMINATOR TROUGHS.

                         SINCE  STARTUP PROBLEMS HAVE OCCURRED AS A RESULT OF H2S GAS  GENERATION IN
                         DEAD SPOTS OF THE REACTION TANKS.  THE TANK AGITATORS  ARE BEING RELOCATED.
1/81  SYSTEM

2/81  SYSTEM

3/81  SYSTEM
                                                                              672

                                                                              744
                                             13-892

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                503  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FIRST QUARTER 1981 THE UTILITY REPORTED THAT THE FGD SYSTEM
                         AVAILABILITY WAS 99.92X.

 4/81  SYSTEM                                                                720

 5/81  SYSTEM                                                                744

 6/81  SYSTEM      97.8                                                      720   614

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE YEAR TO DATE UNIT AVAILABILITY WAS 80.9 X.

                         DURING THE SECOND QUARTER NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED.
                         THE UTILITY REPORTED THAT THE YEAR TO DATE FGD SYSTEM AVAILABILITY WAS
                         96.5 X.

 7/81  SYSTEM                                                                744

 8/81  SYSTEM      99.1                                                      744

 9/81  SYSTEM      99.6                                                      720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         OVERALL FGD SYSTEM AVAILABILITY WAS NOT REPORTED FOR THE MONTH OF JULY.
                         THE MAJOR PROBLEM ENCOUNTERED DURING THE THIRD QUARTER WAS MIST ELIMINATOR
                         BUILDUP RESULTING IN DOWN TIME FOR CLEANING.

                         THE YEAR TO DATE AVAILABILITY OF THE FGD SYSTEM (THROUGH AUGUST) WAS
                         REPORTED TO BE  97.2X.

 10/81  SYSTEM      99.2                                                      744

 11/81  SYSTEM     100.0                                                      720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE END  OF SEPTEMBER AND PART OF OCTOBER THE BOILER WAS TAKEN OFF-
                         LINE FOR SCHEDULED MAINTENANCE.

 12/81  SYSTEM     100.0                                                      744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO FGD-RELATED PROBLEMS OCCURRED DURING DECEMBER.

 1/82  SYSTEM      99.9                                                      744

 2/82  SYSTEM     100.0                                                      672

 3/82  SYSTEM      99.9                                                      744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT FGD SYSTEM PERFORMANCE WAS OUTSTANDING FOR THE
                         FIRST QUARTER 1982.

 4/82  A           99.9
       B           99.9
                                             13-893

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PENNSYLVANIA POWER: BRUCE MANSFIELD 3 (CONT.)
-__	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD   CAP.
                                                                S02   PART.  HOURS HOURS  HOURS FACTOR
       C
       0
       E
       SYSTEM

 5/82  A
       B
       C
       D
       E
       SYSTEM

 6/82  A
       B
       C
       0
       E
       SYSTEM
 10/82
 99.9
 99.9
 99.9
100.0

100.0
100.0
100.0
 64.3
 93.2
100.0

100.0
100.0
100.0
 37.4
100.0
100.0
100.0
                         85.8
                                               720   618
                                   618  62.6
100.0
90.5
                                               744   673
                                   673  58.9
                              100.0
                                                      100.0
                                               720   720
                                   720  72.2
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED  PROBLEMS  WERE  ENCOUNTERED
                         DURING THE SECOND QUARTER OF 1982.
7/82





8/82





9/82





A
B
E
0
E
SYSTEM
A
B
C
D

SYSTEM
A
B
C
0
E
SYSTEM
96.5
100.0
96.8
96.0
74.1
100.0
99.3
89.4
100.0
100.0
100.0
100.0
96.5
100.0
100.0
82.3
100.0
100.0
                              100.0
                                                      100.0
                                                                              744    744
                                                                        744  82.6
                               100.0
                                                        97.4
                                                                              744    725
                                                                        725  71.7
                               100.0
        #*  PROBLEMS/SOLUTIONS/COMMENTS
                                                        99.3
                                                                              720    715
                                                                        715  66.3
                          THE  UTILITY  REPORTED  THAT  NO MAJOR  FGD-RELATED  PROBLEMS WERE ENCOUNTERED
                          DURING  THE THIRD  QUARTER OF 1982.
        A
        B
        C
        D
        E
        SYSTEM
100.0
 95.3
 94.8
100.0
100.0
100.0
                               100.0
                                                        99.6
                                                                              744   741
                                                                        741  66.8
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          NO  FGD-RELATED  PROBLEMS  WERE  REPORTED  DURING OCTOBER.
11/82  A
       B
 14.4
 14.4
                                             13-894

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*
PENNSYLVANIA POWER: BRUCE MANSFIELD 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                                         X REMOVAL   PER  BOILER  FGD   CAP.
                                                         SOS  PART.  HOURS HOURS  HOURS FACTOR
12/82
       C
       D
       E
       SYSTEM
            14.4
            14.4
            18.0
                              100.0
                                                       14.4
                                                                             720   104
                                                                                   104   5.2
       *» PROBLEMS/SOLUTIONS/COMMENTS
                         A SCHEDULED BOILER OUTAGE OCCURRED DURING NOVEMBER.
A
B
C
D
E
SYSTEM
 98,
 99,
 92
100,
100,
100,
                              100.0
                                                       52.4
                                                                      744   390
                                                                        390   26.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         NO FGD-RELATED PROBLEMS MERE REPORTED DURING DECEMBER.
1/83





2/83





3/83





A
B
C
D
E
SYSTEM
A
B
C
D
E
SYSTEM
A
B
C
D
E
SYSTEM
94.3
99.3
99.1
100.0
100.0
100.0
100.0
95.4
100.0
87.4
96.4
100.0
97.7
94.5
96.0
100.0
100.0
100.0
                              100.0
                                                       94.8
                                                                             744   705
                                                                                   705  58.5
                              100.0
                                               100.0
                                                                             672   672
                                                                                          672  62.5
                              100.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                                                       90.6
                                                                             744   674
                                                                                          674  59.0
                          THE  UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                          DURING THE FIRST QUARTER OF 1983.
4/83





5/83





6/83


A
B
C
D
E
SYSTEM
A
B
C
D
E
SYSTEM
A
B
C
91.4
97.2
99.9
96.3
99.9
100.0
91.0
100.0
100.0
100.0
100.0
100.0
80.9
97.5
96.7
                              100.0
                                                       91.7
                                                                      720   660
                                                                                          660  61.7
                               100.0
                                                       100.0
                                                                              744    744
                                                                                   744  64.7
                                             13-895

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 3 (CONT.)
	—PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                              •/. REMOVAL   PER  BOILER  FSD   CAP.
                                              S02  PART. HOURS HOURS  HOURS FACTOR
 10/83
 11/83
       D
       E
       SYSTEM
 97.4
 74.6
100.0
100.0
                        100.0
                                               720   720
720  71.3
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED  PROBLEMS WERE ENCOUNTERED
                         DURING THE SECOND QUARTER OF 1983.
7/83





8/83





9/83





A
B
C
D
E
SYSTEM
A
B
C
D
E
SYSTEM
A
B
C
D
E
SYSTEM
100.0
98.1
100.0
100.0
100.0
100.0
75.1
100.0
88.3
93.2
96.9
100.0
88.7
100.0
87.7
68.8
97.3
100.0
                                                                              744   744
                                                                                                72.9
                                                                              744    667
                                                                                               62.5
                                                                              720    720
                                                                             61.1
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED  PROBLEMS  WERE  ENCOUNTERED
                         DURING THE THIRD QUARTER OF 1983.
        A
        B
        C
        D
        E

        SYSTEM
                    75.9
100.
100.
100.
100.
100.
                                                                              744    658
                                                                                                52.0
        «*  PROBLEMS/SOLUTIONS/COMMENTS
                          NO  MAJOR  FGD-RELATED  PROBLEMS WERE REPORTED DURING  OCTOBER.
        A
        B
        C
        D
        E
        SYSTEM
100.0
100.0
 38.8
100.0
 95.2
100.0
                                                                              720    718
                                                                             65.6
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          THE  MODULE  C  MIST  ELIMINATORS WERE REPLACED  DURING  OCTOBER.
12/83 A
B
C
D
E
SYSTEM
96.5
100.0
100.0
91.2
80.9
100.0
                                                                              744   637
                                                                                                55.8
                                             13-S96

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1964
PENNSYLVANIA POWER:  BRUCE MANSFIELD 3 (CONT.)
PERIOD
1/8*





2/84





MODULE AVAILABILITY OPERABILITY RELIABILITY
A
B
C
D
E
SYSTEM
A
B
C
D
E
SYSTEM
98.2
100.0
100.0
95.9
96.2
100.0
33.1
33.1
33.1
33.1
33.1
41.4
UTILIZATION 7. REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR





744 712 62.3





696 230 21.4
       ** PROBLEMS/SOLUTIONS/COMMENTS
3/84 A
B
C
D
E
SYSTEM
.0
.0
.0
.0

.0
                         NO MAJOR FGO-RELATED PROBLEMS WERE REPORTED DURING THE PERIOD OF DECEMBER
                         FEBRUARY 1984.

                                                         .0
                                                         .0
                                                         .0
                                                         .0
                                                                             744
                                                                                                 .0
       ** PROBLEMS/SOLUTIONS/COMMENTS

                         UNIT 3 WAS OFF LINE DUE TO A SCHEDULED OUTAGE ON THE TURBINE-GENERATOR.
 4/84  A
       B
       C
       D
       E
       SYSTEM
 43.3
 43:3
 43.3
 43.3
 43.3
 54.1
720   240
15.8
       ** PROBLEMS/SOLUTIONS/COMMENTS

                         BRUCE MANSFIELD 3 ENDED A SCHEDULED TURBINE OUTAGE ON APRIL 17, 1984.
5/84





6/84





7/84





A
B
C
D
E
SYSTEM
A
B
C
D
E
SYSTEM
A
B
C
D
E
SYSTEM
100.0
100.0
95.6
92.0
93.0
100.0
100.0
86.2
50.9
100.0
100.0
100.0
91.3
86.4
74.8
93.6
89.3
100.0
                                                                             744   707
                                                                                               73.3
                                                                             720   662
                                                                             73.6
                                                                              744   678
                                                                             66.8
 8/84  A
100.0
                                             13-897

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PENNSYLVANIA POWER: BRUCE MANSFIELD 3 (CONT.)
	,	,	,	PERFORMANCE DATA	.	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
B
C
D
E
SYSTEM
85.3
100.0
84.4
100.0
100.0




744 744 78.6
       #* PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD RELATED PROBLEMS WERE REORTED FROM MAY THROUGH AUGUST, 1984.

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR SEPTEMBER 1984.
                                            13-898

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MM
EQUIVALENT SCRUBBED CAPACITY - MM
 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW
     BOILER FLUE GAS TEMPERATURE
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M
      CU.M/S
      C
 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - X
     RANGE ASH CONTENT - X
     AVERAGE MOISTURE CONTENT - X
     RANGE MOISTURE CONTENT - X
     AVERAGE SULFUR CONTENT - X
     RANGE SULFUR CONTENT - X
     AVERAGE CHLORIDE CONTENT - X
     RANGE CHLORIDE CONTENT -.X

*** PARTICLE CONTROL

 ** FABRIC FILTER
     NUMBER
     NUMBER OF SPARE COMPARTMENTS
 ** PARTICLE SCRUBBER
     NUMBER
     NUMBER OF SPARES
     INITIAL START-UP DATE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     PRESSURE DROP - KPA
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICENCY -
X
*** FGD SYSTEM
 ** GENERAL DATA
     SALEABLE PROOUCT/THROWAHAY PRODUCT
     502 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
                   PHILADELPHIA ELECTRIC
                   CROMBY
                   1
                   PHOENIXVILLE
                   PENNSYLVANIA
                   C
                      43.         (   .100 LB/MMBTU)
                     387.         (   .900 LB/MMBTU)
                   ******         (*»**** LB/MMBTU)
                     351
                     160
                     150
                     495
                     150
                                                ******
                                                ******
                                                BASE
                                                ********
                                                *******
                                                ******
                                                CONCRETE
                                                *******
                                                COAL
                                                ******
                                                ******

                                                    8.20
                                                ******
                                                ********
                                                ******
                                                    2.00
                                                2.0-4.0
                                                ********
                                                ******
(****»** ACFM)
(**** F)
(**** FT)

(***** FT)
                                  (****** BTU/LB)
                                   ******
                    3
                    1
                   10/82
                   VENTURI TOMER
                   VARIABLE-THROAT/VERTICALLY ADJUSTABLE ROD DECKS
                   ROD SCRUBBER
                   ENVIRONEERING
                   NA
                   NA
                   NA
                   NA
                                                    2.5
                                                  138.3
                                                    6.0
                                  (10.0 IN-H20)
                                  (   281 F)
                   SALEABLE PRODUCT
                   WET SCRUBBING
                   MAGNESIUM OXIDE
                   UNITED ENGINEERS
                   UNITED ENGINEERS & CONSTRUCTORS
                                            13-899

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PHILADELPHIA ELECTRIC: CROMBY 1 (CONT.)

     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN SOZ REMOVAL EFFICIENCY - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     INLET GAS TEMPERATURE - C

 ** MIST  ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 »» FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
FULL SCALE
RETROFIT
   92.00
 1
 1/83
10/82
 8/79
NR
NR
    3.50
 3
 1
SPRAY TOWER
NR
NR
ENVIRONEERING
NR
NR
NR
NR
NR
NR
   60.6
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
SLAKER
NR
NR
                      F)
                                             13-900

-------
PHILADELPHIA ELECTRIC: CROMBY 1 (CONT.)
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
 ** PUMPS
     SERVICE
     NA
 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     OVERFLOW STREAM CHARACTERISTICS

*** SALEABLE BYPRODUCTS
     NATURE
     DISPOSITION

*»* SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     SITE TREATMENT

 ** PROCESS CONTROL AND INSTRUMENTATION
     CONTROL LEVELS

 ** FGD SPARE CAPACITY INDICES
     ABSORBER - X

 ** FGD SPARE COMPONENT INDICES
     ABSORBER
                                                NUMBER

                                                ****
CENTRIFUGE
25X
SULFUR1C ACID
MARKETED
NA
NA
NA
N/A
NONE
NR
15Z SOLIDS SLURRY IN ABSORBER RECYCLE TANK; ABSO
   50.0
     .1
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
 10/82  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
                                                                             744
                         THE UTILITY REPORTED THAT INITIAL START-UP OF THE FGD SYSTEM OCCURRED
                         DURING OCTOBER, 1982.

 11/82  SYSTEM                                                                720

 12/82  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR OCTOBER TO DECEMBER 1982.

  1/83  SYSTEM     100.0       100.0       100.0        54.9                  744   408    408

  2/83  SYSTEM     100.0                                  .0                  672     0      0

  3/83  SYSTEM     100.0       100.0       100.0        70.8                  744   526    526
                                            13-901

-------
*/83 SYSTEM
5/83 SYSTEM
6/83 SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
90.2
70.0
9*. 9
7/83 SYSTEM
8/83 SYSTEM
9/83 SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
88.0
89.7
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

PHILADELPHIA ELECTRIC: CROMBY 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL    PER   BOILER   FGD    CAP.
                                                                S02   PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-REUTED  PROBLEMS WERE  ENCOUNTERED
                         DURING THE FIRST QUARTER OF 1983.

                                                                              720   6*9    6*9

                                                                              7**   521    521

                                                                              720   683    683

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-REUTED  PROBLEMS WERE  ENCOUNTERED
                         DURING THE SECOND QUARTER OF 1983.

                                                                              744   744    744

                                                                              744   655    655

                                                                              720   646    646

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED  PROBLEMS WERE  ENCOUNTERED
                         DURING THE THIRD QUARTER OF 1983.

 10/83 SYSTEM     100.0        100.0       100.0         92.8                   7**   690    690

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED  PROBLEMS WERE  ENCOUNTERED
                         DURING THE MONTH OF OCTOBER.

 11/83 SYSTEM                                                                720

 12/83 SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR NOVEMBER AND DECEMBER 1983.

  1/8* SYSTEM                                                                744

  2/8* SYSTEM                                                                696

  3/8* SYSTEM                                                                744

  */8* SYSTEM                                                                720

  5/8* SYSTEM                                                                744

  6/8* SYSTEM                                                                720

  7/8* SYSTEM                                                                744

  8/8* SYSTEM                                                                744

  9/8* SYSTEM                                                                72o
                                             13-902

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PHILADELPHIA ELECTRIC: CROMBY 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED NO MAJOR FGD-RELATED PROBLEMS DURING THE FIRST THREE
                         QUARTERS OF 198*. FGD SYSTEM AVAILABILITY WAS ESTIMATED AT 98.4X.
                                             17-503

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
SOZ EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - V.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT •- 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** PARTICLE SCRUBBER
     NUMBER
     NUMBER OF SPARES
     INITIAL START-UP DATE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES

*** FGD SYSTEM

 *# GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     SOS REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIPM
     DEVELOPMENT LEVEL
     NEK/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL  EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY  -  7.
     CURRENT STATUS
 PHILADELPHIA ELECTRIC
 EDDYSTONE
 1
 EDDYSTONE
 PENNSYLVANIA
 C
    43.
   193.
 ******
 1395
   240
   208
   495
   240
 ******
 ******
 BASE
 ********
   157.2
 ******
 CONCRETE
 *******
               (   .100 LB/MMBTU)
               (   .450 LB/MMBTU)
               (****** LB/MM3TU)
               (******* ACFM)
               (  315 F)
               (**** FT)

               (***** FT)
                (  13600 BTU/LB)
                 ******
COAL
******
31634.

    8.70
******
    5.90
******
    2.00
******
********
******
  3
  0
  6/80
 VENTURI TOWER
 NA
 NA
 PEABODY-LURGI
 STAINLESS STEEL
 AUSTENITIC
 NONE
 N/A
 NONE
  1
 SALEABLE PRODUCT
 WET SCRUBBING
 MAGNESIUM OXIDE
 UNITED ENGINEERS
 UNITED ENGINEERS * CONSTRUCTORS
 DEMONSTRATION
 RETROFIT
7.   99.00
    92.00
  1
                                             13-904

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*
PHILADELPHIA ELECTRIC:  EDDYSTONE 1 (CONT.)

     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 «* ABSORBER
     NUM3ER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C

 *» MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 *» REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWOSK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LIHER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
               (13384 GPM)
               ( 48.5 GAL/1000 ACF)
               (10.0 IN-H20)
               ( 400000 ACFM)
               (  320 F)
12/82
 9/82
 8/79
NR
NR
 3
 0
PACKED TOWER
GRID PACKING
N/A
ENVIRONEERING, RILEY STOKER
STAINLESS STEEL
AUSTENITIC
TYPE 316L
NONE
N/A
N/A
ROD DECKS
 Z
  843.
    6.5
    2.5
  183.76
  160.0
NR
NR
NR
NR
NR
NR
DIRECT COMBUSTION
IN-LINE BURNER
OIL
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
SLAKER
NR
                                            13-905

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PHILADELPHIA ELECTRIC: EDDYSTONE 1 (CONT.)
     DEVICE TYPE

 ** PUMPS
     SERVICE
     NA
 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE

*** SALEABLE BYPRODUCTS
     NATURE
     DISPOSITION

*** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY  PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     SITE TREATMENT

 ** WATER BALANCE
     WATER  LOOP TYPE
     MAKEUP WATER ADDITION  -  LITERS/S
                             NR


                             NUMBER

                             ****


                             NA
                             SULFURIC  ACID
                             MARKETED
                              NA
                              NA
                              NA
                              N/A
                              NONE
                              N/A
                              OPEN
                                  8.3
                                             (   132  GPM)
 	PERFORMANCE DATA	
 PERIOD  MODULE  AVAILABILITY  OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGO   CAP.
                                                                S02   PART.  HOURS  HOURS   HOURS  FACTOR
  5/82   SYSTEM

        #* PROBLEMS/SOLUTIONS/COMMENTS
                                                           744
                          DURING  MAY  INITIAL DEBUGGING OPERATIONS  COMMENCED  WITH  ONE  MODULE  OUT OF
                          THREE ON-LINE.   PRESENTLY,  THE  SYSTEM  IS IN  THE  SHAKEDOWN PHASE  OF OPERA-
                          TION.
  6/82  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
                                                           720
  7/82  SYSTEM

  8/82  SYSTEM

  9/82  SYSTEM

 10/82  SYSTEM

 11/82  SYSTEM

 12/82  SYSTEM

  1/83  SYSTEM

  2/83  SYSTEM
                          DURING JUNE  INITIAL  DEBUGGING  OPERATIONS  CONTINUED  WITH  ONE MODULE  OUT  OF
                          THREE  ON-LINE.   PRESENTLY,  THE SYSTEM  IS  IN  THE  SHAKEDOWN PHASE OF  OPERA-
                          TION.
100.0

100.0
.0

.0
744
744
720
744
720
744
744
672


0
0
0
0
0
0


0
0
0
0
0
0


.0
.0
.0
.0
.0
.0
                                             13-906

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PHILADELPHIA ELECTRIC: EDDYSTONE 1 (CONT.)
PERIOD
3/83
4/83
5/83
6/83
MODULE AVAILABILITY OPERABILITY RELIABILITY
SYSTEM
SYSTEM
SYSTEM
SYSTEM
100.0 100.0 100.0
100.0
100.0
100.0
UTILIZATION X REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR
11.2
.0
.0
.0
744
720
744
720
83
0
0
0
83
0
0
0
6.7
.0
.0
.0
       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE UNIT HAS BEEN DOWN SINCE THE FALL OF 1982 DUE
                         TO BOILER STEAM TUBE CRACKING, HOWEVER IT DID OPERATE FOR A BRIEF PERIOD
                         DURING MARCH 1983.  IT WILL MOST LIKELY BE DOWN FOR THE REMAINDER OF 1983.

 7/83  SYSTEM     100.0                                  .0                  744            0

 8/83  SYSTEM     100.0                                  .0                  744            0

 9/83  SYSTEM     100.0                                  .0                  720            0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER-RELATED PROBLEMS CONTINUED THROUGH SEPTEMBER 1983.

 10/83  SYSTEM     100.0                                  .0                  744     0      0    .0

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         A BOILER-RELATED FORCED OUTAGE OCCURRED DURING OCTOBER 1983.

 11/83  SYSTEM     100.0                                  .0                  720     0      0    .0

 12/83  SYSTEM     100.0                                  .0                  744     0      0    .0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT UNIT 1 WAS OFF LINE DURING NOVEMBER AND DECEMBER
                         1983.

 1/84  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE FGD SYSTEM WAS BROUGHT BACK ON  LINE  IN
                         MID-FEBRUARY,  1984. FGD SYSTEM AVAILABILITY WAS  ESTIMATED AT  75X FOR
                         THE FIRST THREE QUARTERS OF  1984. OUTAGE TIME WAS  ATTRIBUTED  TO
                         SCHEDULED OUTAGES  FOR  ROUTINE MAINTENANCE AND CLEANING.
                                             13-907

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

  ** UNIT DATA  - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

  ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RAN3E HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RAN3E ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

 *** PARTICLE CONTROL

  ** PARTICLE SCRUBBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC  TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
      LINER GENERIC MATERIAL
      LINER SPECIFIC MATERIAL

 *** FGD SYSTEM

  ** GENERAL DATA
     SALEABLE  PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN S02 REMOVAL  EFFICIENCY  -  7.
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT  AWARDED
PHILADELPHIA ELECTRIC
EDDYSTONE
Z
EDDYSTONE
PENNSYLVANIA
C
   43.
  193.
******
 1395
  334
  290
  495
  334
******
PULVERIZED COAL
BASE
********
*******
******
CONCRETE
*******
               (   .100 LB/MMBTU)
               (   .450 LB/MMBTU)
               (****** LB/MMBTU)
               (******* ACFM)
               (**** F)
               (**** FT)

               (***** FT)
               f****** BTU/LB)
                ******
COAL
******
******

    7.40
******
********
******
    2.00
******
********
******
 3
 0
NA
NA
NA
NA
NA
NA
NA
SALEABLE PRODUCT
WET SCRUBBING
MAGNESIUM OXIDE
UNITED ENGINEERS
UNITED ENGINEERS t CONSTRUCTORS
FULL SCALE
RETROFIT
   92.00
  1
12/82
11/82
  8/79
                                             13-908

-------
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PHILADELPHIA ELECTRIC: EDDYSTONE 2 (CONT.)
 »» DESIGN AND OPERATING PARAMETERS

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     INLET GAS FLOW - CU. M/S
     INLEt GAS TEMPERATURE - C

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 »» REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWOPK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION  EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 ** PUMPS
     SERVICE
     NA
NR
NR
 Z
 1
SPRAY TOWER
NR
NR
AMERICAN AIR FILTER
STAINLESS STEEL
AUSTENITIC
TYPE 316L
NONE
N/A
N/A
  283.14
  160.0
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
SLAKER
NR
NR
NUMBER
(  600000 ACFM)
(   320 F)
                                             13-909

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PHILADELPHIA ELECTRIC: EDDYSTONE 2 (CONT.)
 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE                                     NA

*** SALEABLE BYPRODUCTS
     NATURE                                     SULFURIC ACID
     DISPOSITION                                MARKETED

*»* SLUDGE

 *# TREATMENT
     METHOD                                     NA
     DEVICE                                     NA
     PROPRIETARY PROCESS                        NA

 ** DISPOSAL
     NATURE                                     N/A
     TYPE                                       NONE
     SITE TREATMENT                             N/A
 	PERFORMANCE DATA	
 PERIOD  MODULE  AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 11/82   SYSTEM                                                                 720

        **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT INITIAL START-UP OF THE FGD SYSTEM OCCURRED
                         DURING NOVEMBER, 1982.

 12/82   SYSTEM                                                                 744

        **  PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR DECEMBER 1982.

                                                                              744    643    643

                                                                              672    597    597

                                                                              744    640    640

        **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR  FGD-RELATED  PROBLEMS WERE ENCOUNTERED
                         DURING THE FIRST QUARTER OF 1983.

                                                                              720    719    719

                                                                              744    678    678

                                                                              720    720    720

        #*  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR  FGD-RELATED  PROBLEMS WERE ENCOUNTERED
                         DURING THE SECOND  QUARTER OF 1983.

                                                                              744    598    598

                                                                              744    594    594

                                                                              720    322    322
                                             13-910
1/83 SYSTEM
2/83 SYSTEM
3/83 SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
86.4
88.9
86.0
4/83 SYSTEM
5/83 SYSTEM
6/83 SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
99.9
91.2
100.0
7/83 SYSTEM
8/83 SYSTEM
9/83 SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
80.4
79.9
44.7

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PHILADELPHIA ELECTRIC: EDDYSTONE 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       «« PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DUPING THE THIRD QUARTER OF 1983.

10/83  SYSTEM     100.0                                   .0                  744     0      0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED AN ANNUAL OUTAGE AT UNIT Z DURING OCTOBER 1983.

11/83  SYSTEM     100.0                                   .0                  720     0      0    .0

12/83  SYSTEM     100.0                                   .0                  744     0      0    .0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT UNIT 2 UAS OFF LINE DURING NOVEMBER AND DECEMBER
                         1983.

 1/84  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COKMENTS

                         THE UTILITY REPORTED THAT THE FGD SYSTEM WAS BROUGHT BACK ON LINE IN
                         MID-FEBRUARY,  1984. FGD SYSTEM AVAILABILITY WAS ESTIMATED AT 75X FOR
                         THE FIRST  THREE  QUARTERS OF 1984. OUTAGE TIME WAS ATTRIBUTED TO
                         SCHEDULED  OUTAGES  FOR ROUTINE MAINTENANCE AND CLEANING.
                                             13-911

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
SOS EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 «* UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - '/.

*** PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
     NUMBER
     TYPE

 «* FABRIC FILTER
     NUMBER
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.
     TYPICAL GAS/CLOTH RATIO - M/MIN

 ** ESP
     NUMBER
     TYPE

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE
PLATTE RIVER POWER AUTHORITY
RAWHIDE
1
WELLINGTON
COLORADO
A
   13.         (  .030 LB/MMBTU)
   56.         (  .130 LB/MMBTU)
  215.         (  .500 LB/MMBTU)
  250
  279
  250
  495
  279
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
  552.12       (1170000 ACFM)
  132.2        ( 270 F)
  154.         ( 505 FT)
CONCRETE
    5.3        ( 17.5 FT)
               (  8500 BTU/LB)
                7943-9064
COAL
BITUMINOUS
19771.

    5.47
3.7-11.6
   25.96
23.8-27.7
      .34
0.2-0.4
      .01
0.00-0.02
 0
NONE
STEPPED TUBE SHEET
JOY MFG.
  563.0        (1193000 ACFM)
   76.7        ( 170 F)
     .7        (3.0 IN-H20)
   99.7
     .5        (  1.8 FT/MIN)
 0
NONE
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                             13-912

-------
                                                  UTILITY F6D SURVEY:  OCTOBER 1983 - SEPTEMBER  1984
PLATTE RIVER POWER AUTHORITY:  RAWHIDE 1 (CONT.)
*** FGD SYSTEM

 «* GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     502 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 *» DESIGN AND OPERATING PARAMETERS

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TY9E
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     LIQUID PECIRCULATION RATE - LITER/S
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - 7.
     PARTICLE REMOVAL EFFICENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 *» REHEATER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     PERCENT GAS BYPASSED - AVG
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     DESIGM
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
 THROWAWAY PRODUCT
 SPRAY DRYING
 LIME/SPRAY DRYING
 JOY MFG/NIRO ATOMIZER
 BLACK « VEATCH
 FULL SCALE
 NEW
X   99.79
    80.00
  1
  4/84
 12/83
  3/80
 NR
 NR
 SPRAY DRYER
 CROSSFLOW
 ROTARY ATOMIZER
 JOY MFG/NIRO ATOMIZER
 46.0 X 36.0
 CARBON STEEL
 AISI 1110
 N/A
 NONE
 N/A
 N/A
 NONE
     9.
      .9
    24.4
   252.94
   132.2
    80.0
    99.8
(   145 GPM)
(  3.5 IN-H20)
(  80.0 FT/S)
(  536000 ACFM)
(   270 F)
 NONE
 N/A
 N/A
 N/A
 NR
 NR
  0
 NONE
 N/A
 N/A
    10.0
 NONE
 N/A
  6
 NR
 WESTINGHOUSE; NOVENCO
 NR
 NR
 DRY
    92.74       ( 196534 ACFM)
                                            13-913

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PLATTE RIVER POWER AUTHORITY: RAWHIDE 1 (CONT.)
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     NUMBER
     FULL  LOAD DRY FEED CAPACITY - M.TONS/HR

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     NUMBER
     PRODUCT QUALITY - X SOLIDS

 ** PUMPS
     SERVICE
      NA
  **  SOLIDS  CONCENTRATING/DEWATERING
      DEVICE

 ***  SLUDGE

  **  TREATMENT
      METHOD
      DEVICE
      PROPRIETARY  PROCESS

  **  DISPOSAL
      NATURE
      TYPE
      SITE TRANSPORTATION  METHOD
      SITE TREATMENT
      SITE CAPACITY -  CU.M
      SITE SERVICE LIFE  -  YRS

  **  WATEP BALANCE
      WATER  LOOP TYPE
      EVAPORATION  WATER  LOSS -  LITER/S
      MAKEUP WATER ADDITION - LITERS/S
      SOURCE OF  MAKEUP WATER

  #*  CHEMICALS AND CONSUMPTION
      FUNCTION
      NAME
      CONSUMPTION
   76.7
HIGH ALLOY
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
WET BALL MILL
COMPARTMENTED
NR
 Z
    1.8        (
SLAKER
NR
NR
 2
   20.0
NUMBER

****


NONE
N/A
N/A
N/A
INTERIM
LANDFILL
TRUCK
NONE
   2042410
 35
                                                               (  170 F)
    2 TPH)
(   1670.0 ACRE-FT)
CLOSED
   27.0        (  429 GPM)
      .4        (    7 GPM)
WATER REUSE PROGRAM
ABSORBENT
LIME
81 TPH
                                             13-914

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PLATTE RIVER POWER AUTHORITY: RAWHIDE 1 (CONT. )
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


12/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE FGD SYSTEM AT RAWHIDE 1 STARTED UP IN DECEM-
                         BER 1983 AND IS CURRENTLY IN THE SHAKEDOWN/DEBUGGING PHASE OF OPERATION.
                         COMMERCIAL START-UP IS SCHEDULED FOR APRIL 1984.

 1/84  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE SYSTEM WAS IN A START UP MODE DURING THE
                         FIRST QUARTER OF 1984.

 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE FGD SYSTEM WAS DOWN APPROXIMATELY SOX OF
                         THE TIME DURING THE SECOND QUARTER OF 1984. THE MAJORITY OF PROBLEMS
                         HAVE BEEN DUE TO AN APPARENT DESIGN FLAW IN THE CAPACITY OF RECYCLED
                         FLYASH WHICH WAS TO DROP INTO THE RECYCLE CHAMBER FOR CONVEYANCE TO THE
                         SPRAY DRYER.  MODIFICATIONS WERE COMPLETED IN JUNE ON THE CONVEYANCE
                         SYSTEM.

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED PROBLEMS IN REMOVING FLYASH FROM A BAGHOUSE DURING
                         THE THIRD QUARTER.  FLUIDIZED BED STONES WERE ADDED TO INCREASE SURFACE
                         AREA, HOWEVER THE ASH EVENTUALLY HAD TO BE REMOVED WITH A VACUUM TRUCK.

                         ADDITIONAL PROBLEMS AROSE IN REMOVING THE FLYASH FROM THE VACUUM TRUCK
                         AND RESULTED IN A DECISION TO LANDFILL IT.

                         THE FGD SYSTEM WAS DOWN MORE THAN BOX OF THE TIME DURING THE THIRD
                         QUARTER DUE TO RECYCLE ASH PROBLEMS.
                                             13-915

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC  FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY U'O/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - '/.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RAN3E CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
     NUMBER
     TYPE

 ** ESP
     NUMBER
     NUMBER OF SPARES
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*** FGD SYSTEM
PUBLIC SERVICE INDIANA
GIBSON
5
PRINCETON
INDIANA
0
  516.
******
 3250
  670
  495
  495
  670
(   .100 LB/MMBTU)
(  1.200 LB/MMBTU)
(****** LB/MMBTU)
FOSTER WHEELER
PULVERIZED COAL
BASE
********
*******
152.
NR
5.8



(******* ACFM)
(**** F)
( 500 FT)

( 19.0 FT)
COAL
******
******

********
8.4-15.3
********
******
    3.30
2.0-4.4
********
******
 0
NONE
 1
 0
COLD SIDE
ENVIROTECH
 1076.9
  148.9
   99.5
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
(****** BTU/LB)
 10282-11516
(2282000 ACFM)
(   300 F)
                                             13-916

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER
PUBLIC SERVICE INDIANA:  GIBSON 5 (CONT.)
 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     502 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMEER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID KECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X
     PARTICLE REMOVAL EFFICENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     NUMBER OF STAGES
     NUM3ER OF PASSES PER STAGE
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH RATE - L/S

 ** REHEATER
     NUM3ER
     NUMBER OF SPARES
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     INLET FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
THROWAWAY PRODUCT
WET SCRUBBING
LIMESTONE
MAG
M.W. KELLOGG
SARGENT t LUNDY
FULL SCALE
NEW
   86.00
 1
 3/83
10/82
 5/79
NR
NR
SPRAY TOWER
OPEN CROSSCURRENT SPRAY
HORIZONTAL SPRAY CHAMBER
PULLMAN KELLOGG
CARBON STEEL
AISI 1110
N/A
INORGANIC
HYDRAULICALLY-BONDED MORTAR
PRE-KRETE G-8
NONE
 2327.
    7.2
  325.74
  137.8
   95.0
   80.0
(36930 GPM)
(  53.5 GAL/1000 ACF)
(  690280 ACFM)
(   280 F)
PRIMARY COLLECTOR
IMPINGEMENT
BAFFLE
CLOSED VANE
    1
    1
    6.7
ORGANIC
POLYPHENYLENE
MAKEUP
   50.5
(  22.0 FT/S)
(   800 GAL/MIN)
 1
 1
INDIRECT HOT AIR
EXTERNAL HEAT EXCHANGER
STEAM TUBE BUNDLE
  210.0         (  410 F)
CARBON STEEL
AISI 1110
                                            13-917

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

PUBLIC SERVICE INDIANA: GIBSON 5 (CONT.)
 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 #* FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER

 »* REAGENT PREPARATION EQUIPMENT
     FUNCTION
     MANUFACTURER
     NUMBER

 ** PUMPS
     SERVICE
      RECIRCULATION

  **  SOLIDS  CONCENTRATING/DEWATERING
      DEVICE
      NUMBER
      NUMBER OF  SPARES
      CONFIGURATION
      DIMENSIONS - FT
      SHELL  SPECIFIC MATERIAL TYPE
               (  775000 ACFM)
               (   390 F)
CENTRIFUGAL
GREEN FAN
BOOSTER
FORCED DRAFT
DRY
  365.72
  143.3
NR
 2
 0
CENTRIFUGAL
WESTINGHOUSE
UNIT
FORCED DRAFT
DRY
 2
 0
CENTRIFUGAL
WESTINGHOUSE
UNIT
FORCED DRAFT
DRY
NR
NR
NR
NR
NR
NR
NR
DOWN STREAM OF ABSORBERS
CARBON STEEL
AISI 1110
INORGANIC
HYDRAULICALLY-BONDED MORTAR
WET BALL MILL
COMPARTMENTED
NR
KENNEDY VAN SAUN
 1
SLAKER
WALLACE
 1
NUMBER

  16
THICKENER
 2
1
CIRCULAR
150.0 DIA
CONCRETE
        4 TIERNAN
                                            13-918

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PUBLIC SERVICE INDIANA: GIBSON 5 (CONT.)

     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     SHELL GENERIC MATERIAL TYPE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS

*«* SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     SITE TREATMENT

 ** PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     MONITOR LOCATION
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE

 ** MATER BALANCE
     WATER LOOP TYPE
     MAKEUP WATER ADDITION - LITERS/S

 «* CHEMICALS AND CONSUMPTION
     FUNCTION
     NAME
     PRINCIPAL CONSTITUENT
     POINT OF ADDITION

 »» FGD SPARE CAPACITY INDICES
     ABSORBER - X

 ** FGD SPARE COMPONENT INDICES
     ABSORBER
                       GLASS FLAKE-FILLED POLYESTER
                       10X SOLIDS
                       BOX SOLIDS
                       VACUUM FILTER
                        4
                       1
                       CARBON STEEL
                       30X SOLIDS
                       SOX SOLIDS
                       FIXATION
                       PUG MILL
                       CONVERSION SYSTEMS [POZ-0-TEC1
                       NA
                       NA
                       NR
                       INLET S02.PH
                       ABSORBER INLET
                       AUTOMATIC
                       FEEDBACK/FEED FORWARD
                       CLOSED
                          38.4
                       ABSORBENT
                       LIMESTONE
                       CAC03
                       BALL MILL
                          33.3
                           1.0
(   609 GPM)
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
 10/82  SYSTEM

       »* PRCBLEMS/SOLUTIONS/COMMENTS
                                                                             744
11/82  SYSTEM

12/82  SYSTEM

 1/83  SYSTEM

 2/83  SYSTEM

 3/83  SYSTEM
THE UTILITY REPORTED THAT INITIAL START-UP OF THE FGD SYSTEM OCCURRED
DURING OCTOBER, 1982.

                                                    720

                                                    744

                                                    744

                                                    672

                                                    744
                                            13-919

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PUBLIC SERVICE INDIANA: GIBSON 5 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                       X REMOVAL   PER  BOILER  FGD   CAP.
                                       S02  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
 4/83  SYSTEM

 5/83  SYSTEM

 6/83  SYSTEM
THE UTILITY REPORTED EXPERIENCING PROBLEMS WITH SLURRY REENTRAINMENT TO THE
GAS STREAM RESULTING IN AN INCREASED CONCENTRATION OF PARTICULATE MATTER
IN THE FLUE GAS.  THE PROBLEM FORCED THEM TO LIMIT BOILER LOAD TO 410 MW.

                                                    720

                                                    744

                                                    720
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         UTILITY REPORTED THAT ITS SLURRY REENTRAINMENT  PROBLEM  IS  BELIEVED TO BE
                         DUE TO UNOERDESIGNED DOHNCOMERS AND DRAIN TUBES.   DESIGN MODIFICATIONS MILL
                         BE IMPLEMENTED AND TESTED ON ONE OF THE  FOUR WEIR  MODULES.   TESTING  IS
                         SCHEDULED  FOR SOMETIME  IN AUGUST OR SEPTEMBER.   IF TESTS ARE SUCCESSFUL,
                         THE UTILITY  PLANS TO MAKE MODIFICATIONS  ON  THE  REMAINING 3 MODULES AND
                         SCHEDULE A FULL LOAD COMPLIANCE TEST  IN  NOVEMBER.
7/83




8/83




9/83




A
B
C
D
SYSTEM
A
B
C
D
SYSTEM
A
B
C
D
SYSTEM
27.3
98.5
75.7
95.4
99.0
100.0
95.0
.0
99.3
98.1
86.7
86.0
33.3
53.3
86.4
27.3
98.5
75.5
95.4
98.9
75.7
94.3
.0
94.2
88.1
99.9
92.8
37.7
62.8
97.7
100.0
99.9
99.6
99.9
100.0
100.0
98.7

99.1
99.3
100.0
100.0
100.0
100.0
100.0
27.3
98.5
75.5
95.4
98.9
75.5
94.1
.0
94.0
87.9
84.6
78.6
31.9
53.2
82.8
                                                                              744    744
                                                                              744    742
                                                                              720    610
                                                                                           736
                                                                                           654
                                                                                           596
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE  UTILITY  REPORTED THAT THE TESTS WERE SUCCESSFUL  AND  THE  MODIFICATIONS
                          WILL BE  IMPLEMENTED ON THE REMAINING  3 MODULES.   THE MODIFICATIONS  SEEMED
                          TO HAVE  SOLVED  THEIR WATER CARRYOVER  AND OPACITY PROBLEMS.   THE  UNIT WILL
                          UNDERGO  CERTIFICATION IN NOVEMBER.

                          THE  SYSTEM SUPPLIER IS PRESENTLY  WORKING TO  SOLVE A  HIGH ABSORBER  FLUE GAS
                          VELOCITY PROBLEM.  THE DESIGN AND ACTUAL FLUE  GAS VELOCITIES ARE 24.5 ANT)
                          60.0 FT/SEC,  RESPECTIVELY.   THE SUPPLIER BELIEVES THAT THE  SLURRY  SPRAY
                          FROM THE HIGH PRESSURE NOZZLES IS COMPRESSING  THE GAS FLOW  AMD SUBSEQUENTLY
                          CAUSING  POOR GAS DISTRIBUTION AND HIGHER THAN  DESIGN GAS VELOCITIES. THE
                          SUPPLIER PLANS  TO  TEST LOW PRESSURE NOZZLES  AND/OR INSTALL  GAS DIS-
                          TRIBUTION VANES.

                          CORROSION WAS REPORTED IN THE LOWER PLENUM ON  THE BYPASS REHEAT  DUCT.
                          GIBSON 5 USES TWO  TYPES OF REHEAT, DEPENDING UPON THE SULFUR CONTENT OF
                          THE  COAL BEING  BURNED.  PRIMARY REHEAT IS  DONE WITH  17-20X  BYPASS WHEN
                          BURNING  PERFORMANCE COAL.  THE INDIRECT HOT  AIR STEAM HEAT  EXCHANGERS ARE
                          ONLY USED WHEN  THEY HAVE TO  BYPASS  LESS WHEN THE SULFUR  CONTENT  OF THE
                          COAL GETS TOO HIGH.
 10/83  A
                     9.7
                                25.2
                                           100.0
                               2.6
                                             13-920

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

PUBLIC SERVICE INDIANA:  GIBSON 5 (CONT. )
PERIOD MODULE AVAILABILITY
B
C
D
SYSTEM
100.0
100.0
.0
69.9
OPER ABILITY
100.0
9*. 2
.0
73.1
	 KCKCUKCIANtt DATA 	
RELIABILITY UTILIZATION X REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR
100.0
100.0
100.0
11.3
9.5
.0
7.8
744 75 58 2.8
  1/84
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         MODULES A AND D HERE NOT AVAILABLE DURING OCTOBER DUE TO ABSORBER MATER
                         CARRYOVER PROBLEMS.  THE SYSTEM SUPPLIER IS MAKING MODIFICATIONS.
A
B
C
D
SYSTEM
63.6
46.9
94.7
53.2
86.2
85.0
51.8
93.9
34.7
88.4
100.0
100.0
100.0
100.0
100.0
76.9
46.9
85.0
31.4
80.1
11/83
                                                                             720   652    577

       ** PRCSLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED OUTAGES MERE REPORTED DURING NOVEMBER 1983.

 12/83
A
B
C
0
SYSTEM
91.9
.0
96.8
92.7
93.8
89.4
.0
92.0
82.5
88.0
100.0

100.0
100.0
100.0
89.0
.0
91.5
82.1
87.5
                                                                             744   740    651

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING DECEMBER, MODIFICATIONS WERE BEING MADE BY THE VENDOR AT THE B
                         MODULE TO CORRECT A DRAINAGE PROBLEM FROM THE ABSORBER TO THE REACTOR.
A
B
C
D
SYSTEM
59.8
62.0
70.0
73.0
88.3
58.3
62.0
70.0
61.0
83.8
98.4
100.0
99.0
100.0
100.0
58.3
62.0
70.0
61.0
83.8
                                                                             744   744    623

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT ONE MODULE WAS DOWN DURING THE MONTH FOR DESIGN
                         MODIFICATIONS.

                         THE REMAINING MODULES WERE HELD OUT APROXIMATELY TWO DAYS EVERY TWO TO
                         THREE WEEKS FOR MIST ELIMINATOR CLEANING.
A
B
C
D
SYSTEM
97.0
100.0
84.8
100.0
100.0
70.7
62.0
34.0
96.6
87.8
91.4
96.2
102.1
100.0
100.0
29.0
25.4
13.9
39.7
36.0
  2/84
                                                                             696   286    251

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED DURING FEBRUARY.

  3/84  A           76.5        67.1       100.0        55.2
       B           94.5        92.4       100.0        76.1
       C           96.0        90.8       100.0        74.7
       D           60.5        66.9       100.0        55.1
       SYSTEM     100.0       100.0       100.0        87.1                  744   613    648
                                             13-921

-------
UTILITY FED SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE INDIANA: GIBSON 5 (CONT.)
_.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         SLURRY RECIRCULATION SPRAY NOZZLES WERE CLEANED DURING MARCH.

                         THE REACTOR BLOW DOWN VALVES OF MODULES A AND D WERE REPLACED DURING MARCH.

                         MODULE A AND D REACTOR VENT BLOWER WERE REBUILT, AND THE REACTOR
                         VENT BLOWER BEARINGS OF MODULE C WERE REPLACED DURING THE MONTH.

                         THE REACTOR SUMP PUMP SUCTION VALVES OF MODULE D WERE REBUILT DURING MARCH.

                         MODULE D BOOSTER FAN BEARINGS WERE REPLACED DURING THE MONTH.

                         THE MIST ELIMINATOR STIFFENERS FOR MODULE D WERE INSTALLED DURING MARCH.

                         MODULE B AND D FILTER DRUMS WERE RECLOTHED DURING THE MONTH.

                         THE BALL MILL SUMP PUMPS OF MODULES A AND B WERE REBUILT DURING MARCH.

                         A BROKEN SCREW IN THE MODULE B FLYASH ADDITIVE LIME SCREW CONVEYOR CAUSED
                         ADDITIONAL OUTAGE TIME IN MARCH.

                         A BROKEN SUPPORT BEAM IN MODULE A CONTRIBUTED TO FGD OUTAGE DURING THE
                         MONTH.

                         THE UTILITY REPORTED REPLACING SLURRY FEED PUMP BELTS DURING MARCH.
A
B
C
D
SYSTEM
.0
23.3
23.3
20.0
22.2
.0
100.0
94.8
78.5
91.1

100.0
101.3
82.8
94.7
.0
22.2
21.0
17.4
20.2
                                                                             720   159    145

        ** PRC8LEMS/SOLUTIONS/COMMENTS

                          THE  FLYASH  SILO BAG FILTERS OF MODULE B WERE REPLACED DURING THE MONTH.

                          A  UNIT OUTAGE OCCURRED FROM APRIL 8 TO MAY 7, 1984, DURING WHICH TIME
                          NUMEROUS REPAIRS WERE MADE.

                          THE  117 LA  SLAKER WAS REBUILT DURING APRIL.

                          THE  FOLLOWING FAN REPAIRS WERE MADE DURING THE APRIL UNIT OUTAGE:
                          (1)  MODULE  A'S REACTOR VENT BLOWER WAS REPLACED.
                          (2)  MODULE  C'S REACTOR VENT BLOWER BEARINGS WERE REPLACED.
                          (3)  THE BOOSTER FANS OF MODULES A, B AND C WERE INSPECTED.

                          THE  MIST ELIMINATOR TRAYS OF MODULES A AND C WERE REBUILT DURING APRIL.

                          THE  FOLLOWING VALVE REPAIRS WERE MADE DURING THE APRIL UNIT OUTAGE:
                          (1)  THE REPLACEMENT OF TWO REACTOR VENT BLOWER CHECK VALVES.
                          (2)  THE RUBBER BOOT ON THE SUCTION VALVE OF UNDER FLOW PUMP, B-2, WAS
                          REPLACED.
                          (3)  THE MANUAL BLOCKING VALVE ON UNDERFLOW PUMP, B-2, WAS REPLACED.
                          (4)  THE SLURRY RECIRCULATION PUMP SUCTION VALVES OF MODULES B AND C WERE
                          REPACKED.

                          THE  FOLLOWING PUMP REPAIRS WERE MADE DURING THE APRIL UNIT OUTAGE:
                          (1)  THE SLURRY FEED PUMPS OF MODULES A, B AND C WERE REBUILT.
                          (2)  THE SEAL WATER BOOSTER PUMPS OF MODULES A AND B WERE REBUILT.
                          (3)  THE SLURRY RECIRCULATION PUMPS, A-l THROUGH A-4 AND B-l THROUGH B-4,
                          WERE REPACKED.
                          (4)  THE SLURRY RECIRCULATION PUMP, A-l, WAS REBUILT (NEW PROPELLER, SLEEVE,
                                             13-922

-------
                                                  UTILITY F60 SURVEY:  OCTOBER  1983 -  SEPTEMBER  198*

PUBLIC SERVICE INDIANA:  GIBSON 5 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD   CAP.
                                                                S02  PART.  HOURS HOURS   HOURS  FACTOR

                         SEALS, RUBBER LINE).
                         (5) THE SLURRY RECIRCULATION PUMP,  B-3, MAS REBUILT.
                         (6) THE SLURRY RECIRCULATION PUMP OIL OF MODULES A, B AND  C  WAS CHANGED.

                         THE SLURRY RECIRCULATION SPRAY NOZZLES MERE CLEANED DURING APRIL.

                         THE FOLLOMING BALL MILL REPAIRS MERE MADE DURING THE  APRIL UNIT OUTAGE:
                         (1) MAIN JOURNAL BEARINGS MERE REPACKED.
                         (2) CLUTCH BOOTS MERE REPLACED.
                         (3) OIL MAS CHANGED.
                         (4) FEED CHUTE, TROMMEL SCREEN, OUTLET DISCHARGE HOOD AND  DISECTOR VALVE
                         MERE REPLACED.

                         THE PUG MILL BEARINGS, SEALS, SLEEVES, MIPERS AND  OIL WERE REPLACED DURING
                         THE APRIL UNIT OUTAGE.

                         THE SURGE TANK AGITATOR RUBBER LINING HAS REPLACED DURING  APRIL.

                         DURING APRIL, THE OUTLET DUCTWORK WAS CLEANED OF SLURRY AND  SLUDGE.
                         ALSO, APPROXIMATELY 20* OF THE PRE-KRETE MAS REPLACED.
5/84




A
B
C
D
SYSTEM
.0
65.5
71.0
71.0
69.1
.0
87.9
87.7
74. 4
83.3

100.0
100.0
99.2
99.7
.0
61.8
61.7
52.3
58.6
                                                                             744   523    436   38.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE A WAS OUT OF SERVICE DURING MAY TO CHANGE MIST ELIMINATOR SUPPORTS.

                         THE SLEEVES AND THROAT LINES OF SLURRY RECIRCULATION PUMPS,  C-l, C-2,
                         C-3 AND A-2, WERE INSTALLED DURING MAY.

                         THE 117L SLAKER MAS REBUILT DURING MAY.

                         THE BALL MILL CLASSIFIER HAS REBUILT DURING THE MONTH.

                         THE REACTOR SLURRY RECIRCULATION PUMP SUCTION VALVES OF MODULE  C WERE
                         REPACKED DURING MAY.
6/84




A
B
C
D
SYSTEM
89.4
96.5
63.9
80.7
100.0
81.4
88.2
42.2
75.0
95.6
100.0
100.0
100.0
100.0
100.0
81.4
88.2
42.2
75.0
95.6
                                                                             720   720    688  70.8

       #* PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE C WAS OUT OF SERVICE FOR SEVEN DAYS DURING JUNE DUE TO MIST
                         ELIMINATOR MODIFICATION.

                         THE FOLLOWING VALVE REPAIRS WERE MADE DURING JUNE:
                         (1) THE VACUUM FILTER REGULATING VALVE BOOTS OF MODULES 5B AND 5C WERE
                         REPLACED.
                         (2) THE FILTER FEED PUMP RECIRCULATION VALVE OF MODULE 5A MAS REBUILT.
                         (3) THE SUCTION VALVES OF THICKENER UNDERFLOM PUMPS, 5A-1 AND 5A-2, WERE
                         REBUILT.
                         (4) 117L AND 117LA SLAKER TORQUE VALVES HERE REPLACED.
                         (5) THE A-2 MIST ELIMINATOR VALVE HAS REPLACED.

                         THE 117LA SLAKER BELT HAS REPLACED DURING JUNE.

                         THE VACUUM FILTER DRUM OF MODULE C HAS REWIRED DURING JUNE.
                                            13-923

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE INDIANA: GIBSON 5 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                502  PART. HOURS HOURS  HOURS FACTOR

                         DURING THE MONTH, THE SLEEVE AND THROAT RING OF RECIRCULATION PUMP, D-l,
                         WERE REBUILT, AND THE 5A-1 UNDERFLOW PUMP WAS REBUILT.

                         MODULES C AND D ABSORBER SPRAY NOZZLES WERE CLEANED DURING JUNE.
7/84




A
B
C
D
SYSTEM
88.7
50.1
61.8
96.6
99.1
83.0
32.2
34.7
89.1
79.6
100.0
100.0
99.6
99.8
100.0
80.4
31.2
33.6
86.3
77. 2
                                                                             744   721    574  48.5

        **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE MIST ELIMINATOR BRACING OF MODULES B AND C WAS MODIFIED DURING JULY.

                         THE SB SLAKER WEIGH FEEDER BELT WAS REPLACED DURING THE MONTH.

                         THE ABSORBER NOZZLES OF MODULE B WERE CLEANED DURING JULY.

                         THE EXPANSION JOINTS ON THE FLYASH ROTARY FEEDERS 5A AND SB WERE REPLACED
                         DURINS JULY.

                         THE UTILITY REPORTED THAT THE EXPANSION BOOT FOR THE ADDITIVE AND DOLOMITIC
                         LIME SILOS LIVE BOTTOM WAS REPLACED DURING THE MONTH.

                         THE FILTER BAGS IN THE ADDITIVE AND DOLOMITIC LIME DAY BIN DUST COLLECTORS
                         WERE REPLACED DURING JULY.

                         DURINS JULY, NEW METAL WAS WELDED ONTO THE BALL MILL CENTER PARTITION IN
                         AREAS OF EXCESSIVE WEAR.

                         THE 5A9 MIST ELIMINATOR VALVE WAS REPLACED DURING JULY.

                         THE REGULATING VALVE BOOT WAS REPLACED ON FILTER VAT 5A DURINo JULY.

                         FILTER DRUM 5A RECEIVED A NEW WIRE WRAP DURING JULY.
8/84




A
B
C
D
SYSTEM
68.4
80.8
87.4
34.9
90.5
47.8
83.0
92.0
33.0
85.3
100.0
88.4
89.1
100.0
100.0
42.9
74.5
82.5
29.6
76.5
                                                                             744   667    569  51.3

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE UTILITY REPORTED THAT SLAKER REPAIRS WERE MADE DURING THE MONTH OF
                          AUGUST.

                          REPAIRS WERE MADE ON THE BALL MILL DURING THE MONTH OF AUGUST.

                          A  RUBBER  EXPANSION JOINT WAS REPLACED ON THE LIME SILO.

                          A  REACTOR VENT BLOWER WAS REBUILT DUE TO BAD INBOARD BEARINGS.

                          MODULES A.B.C.D UNDERWENT ROUTINE PUMP MAINTENANCE.

                          SLURRY CIRCULATION PUMP VALVES WERE REPLACED DUE TO LEAKS.

                          THE UTILITY REPORTED THAT THE FGD SYSTEM SUPPLIER MADE DESIGN MODIFICATIONS
                          DURING THE MONTH.

                          PRECRETE  AND FLAKEGLASS ABSORBER LININGS WERE REPAIRED.

                          SLURRY SPRAY NOZZLES WERE CLEANED DURING AUGUST.

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE INDIANA:  GIBSON 5 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         MIST ELIMINATOR SUPPORT BEAMS WERE REPLACED DURING THE MONTH.

                         AN INLET SLIDE GATE DAMPER MAS REPLACED DURING AUGUST.

                         THE UTILITY REPORTED THAT A VACUUM FILTER CLOTH WAS REPLACED DURING AUGUST.

                         BAGS AND SEPARATOR STONES WERE REPLACED ON THE FLY ASH SILO.

 9/8*  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR SEPTEMBER 198*.
                                             13-925

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC F6D SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGO - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - V.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - '/.
     AVERAGE SULFUR CONTENT - '/.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RAN3E CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 «* ESP
     NUMBER
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUBBER
     NUMBER
     NUMBER OF SPARES
     INITIAL START-UP DATE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIPCULATION RATE - LITER/S
     L/G RATIO - LITER/CU.M
     PRESSURE DROP - KPA
     SUPERFICIAL GAS VELOCITY - M/S
PUBLIC SERVICE OF NEW MEXICO
SAN JUAN
1
WATERFLOW
NEW MEXICO
A
    9.         (  .020 LB/MMBTU)
  279.         (  .650 LB/MMBTU)
******         (****** LB/MMBTU)
 1560
  361
  314
  330
  361
FOSTER WHEELER
PULVERIZED COAL
BASE
  750.32
  122.8
  122.
CONCRETE
    6.1
 (1590000 ACFM)
 (  253 F)
 (  400 FT)

 (  20.0 FT)
COAL
SUBBITUMINOUS
20934.

   22.00
12.6-22.5
   14.82
******
      .80
0.6-1.3
      .03
0.00-0.09
 (   9000 BTU/LB)
  8000-11628
HOT SIDE
WESTERN PREC.
  943.8
  371.1
     .6
   99.8
DIVISION, JOY
 (2000000 ACFM)
 (   700 F)
 (   3. IN-H20)
 4
 1
 4/78
VENTURI TOWER
VARIABLE-THROAT/BOTTOM-ENTRY PLUMB BOB
N/A
DAVY MCKEE
12.5 DIA X 28.0
CARBON STEEL
AISI 1110
INORGANIC
PREFIRED BRICK/SHAPES
STAINLESS STEEL
 1
  224.9        ( 3570 GPM)
     -9        (7.1 GAL/1000ACF)
    3.1        (12.5 IN-H20)
   48.8        (  160.0 FT/S)
                                            13-926

-------
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 198*
PUBLIC SERVICE OF NEW MEXICO:  SAN JUAN 1 (CONT.)

     INLET GAS FLOW RATE - CU.M/S
     INLET GAS TEMPERATURE - C
     PARTICLE REMOVAL EFFICIENCY - '/.

*«* FGD SYSTEM
       237.4
       134.4
        75.0
(  503000 ACFM)
(   274 F)
 ** GENERAL DATA
     SALEABLE PROOUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - V.
     ENERGY CONSUMPTION - Y.
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS

 «» QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUM3ER OF CONTACTING ZONES
     DISTANCE BETWEEN GAS CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUFERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - '/.
     SALEABLE  PRODUCT
     WET SCRUBBING
     WELLMAN LORD
     NONE
     DAVY MCKEE
     STEARNS-ROGER
     FULL SCALE
     RETROFIT
    X   99.80
        90.00
         4.4
      1
      4/78
      4/78
      2/74
     MR
     NR
      4
      1
     TRAY TOWER
     VALVE TRAY
     BUBBLE CAP TRAY TOWER
     DAVY MCKEE
     24.0 X 29.0 X 79.0
     INORGANIC
     HYDRAULICALLY-BONDED CONCRETE
     PORTLAND CEMENT
     INORGANIC
     ACID-RESISTANT BRICK CLOW H20 ABSORPTIONl
     VALVE TRAY
  ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUM3ER OF PASSES PER STAGE
     PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH FREQUENCY
     WASH RATE - L/S
- CM     5.1        (     2.0IN)
        47.         (   750 GPM)
          .2        (1.7 GAL/1000 ACF)
         4.0        (16.0 IN-H20)
         3.3        (  10.8 FT/S)
       205.28       (  435000 ACFM)
        48.9        (   120 F)
        90.0
     PRIMARY COLLECTOR
      4
     IMPINGEMENT
     BAFFLE
     CLOSED VANE
     HORIZONTAL
         1
          .0        (   .0 IN-H20)
         3.2        (  10.5 FT/S)
     ORGANIC
     POLYPHENYLENE
     BLENDED
     CONTINUOUS ON ONE t INTERMITTENT ON THE OTHER
         3.8        (60 GAL/MIN)
                                            13-927

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEU MEXICO: SAN JUAN 1 tCONT.)
 ** REHEATER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     TEMPERATURE INCREASE - C
     INLET FLUE GAS FLOW RATE - CU. M/S
     INLET FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTKORK
     LOCATION
     DIMENSIONS
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 ** TANKS
     SERVICE
      ABSORBER  RECYCLE

  ** PUMPS
      SERVICE
      ABSORBER  PRODUCT  TRANSFER
      SCRUBBER  RECIRCULATION
      ABSORBER  RECIRCULATION
      ABSORBER  SPRAY  RECIRCULATION

  **  SOLIDS  CONCENTRATING/DEWATERING
      DEVICE

 ***  SALEABLE BYPRODUCTS
      NATURE
      FULL LOAD QUANTITY  -  M  T/H
      QUALITY - 7.
      DISPOSITION
INDIRECT HOT AIR
EXTERNAL HEAT EXCHANGER
STEAM TUBE BUNDLE
   27.8        (   50 F)
  647.45       (1372000 ACFM)
   51.7        (  125 F)
STAINLESS STEEL
AUSTENITIC
CENTRIFUGAL
BUFFALO FORGE
BOOSTER
FORCED DRAFT
DRY
  276.06
  122.8
CARBON STEEL
(  585000 ACFM)
(   253 F)
NR
NR
NR
NR
NR
NR
NR
ESP TO FANS
16.0 X 24.0
CARBON STEEL
AISI 1110
NR
NR
MIX TANK
N/A
AGITATED TANK
NUMBER

   1


NUMBER
   2
   4
  20
   8
NONE
SULFURIC ACID
    1.45
   99.0
MARKETED
(   1.60 TPH)
                                             13-928

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 1 (CONT.)
*** SLUDGE


 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS


 *» DISPOSAL
     NATURE
     TYPE
     SITE TREATMENT


 ** PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     CONTROL LEVELS
     MONITOR LOCATION
     PROCESS CONTROL MANNER


 ** WATER BALANCE
     WATER LOOP TYPE

     POND SEEPAGE/RUNOFF WATER LOSS - LITERS/S
     MAKEUP WATER ADDITION - LITERS/S


 ** FGD SPARE CAPACITY INDICES
     ABSORBER - '/.


 ** FGD SPARE COMPONENT INDICES
     ABSORBER
N/A
N/A
N/A
N/A
NONE
N/A
PH » DENSITY
PH 5.5-6.5J SP.GR. 1.2-1.3
ABSORBER BLEED i PRODUCT SOLUTION
MANUAL
CLOSED


   23.0



   33.3



    1.0
               (  365 GPM)
	PERFORMANCE DATA	

PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                Y. REMOVAL   PER  BOILER  FGO   CAP.
                S02  PART. HOURS HOURS  HOURS FACTOR
  0/78  SYSTEM
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         NOTE: ALTHOUGH THIS FGD SYSTEM IS DESIGNED TO BRING THE BOILER INTO COM-
                               PLIANCE WITH A 0.34 LB/MM BTU SOZ EMISSION STANDARD, THE STATE HAS
                               INITIALLY ONLY REQUIRED A 1.2 LB/MM BTU S02 CONTROL LEVEL.  SAN
                               JUAN 1 WILL BE REQUIRED TO MEET THE MORE STRINGENT S02 EMISSION
                               LIMITATION VALUE BY SEPTEMBER 1, 1980.  THE UNIT ONLY REQUIRES TWO
                               OF THE FOUR SCRUBBING TRAINS TO MEET THE 1.2 LB/MM BTU LIMITATION
                               VALUE; HOWEVER, THREE ARE REQUIRED FOR THE MORE STRINGENT LIMITATION
                               VALUE (THE SYSTEM IS DESIGNED TO INCLUDE ONE SPARE SCRUBBING TRAIN
                               WHEN MEETING THE 0.34 LB/MM BTU S02 EMISSION STANDARD).  BECAUSE
                               OF THIS CHANGE IN EMISSION LIMITATION VALUES THE FGD SYSTEM WILL
                               EFFECTIVELY HAVE AN ABSORBER SPARE COMPONENT INDEX OF 2.0 (100X
                               SPARE CAPACITY FOR THIS SYSTEM) THROUGH AUGUST, 1980 AND 1.0
                               (33.3X SPARE CAPACITY FOR THIS SYSTEM) THEREAFTER.  CONSEQUENTLY
                               THE "SYSTEM" DEPENDABILITY FACTORS WILL BE CALCULATED AS:
                                                  MODULAR AVERAGE X 2.00
                                           THROUGH AUGUST, 1980 AND:
                                                  MODULAR AVERAGE X 1.33
                                           THEREAFTER.
 4/78  SYSTEM


       ** PROBLEMS/SOLUTIONS/COMMENTS
                                                                             720
 5/73  SYSTEM
                          S02 ABSORPTION BEGAN ON APRIL 8, 1978 USING TWO OF THE FOUR CELLS.  ONE
                          THIRD OF THE FLUE GAS IS BEING BYPASSED.  THE FGD SYSTEM IS IN A
                          SHAKEDOWN/DEBUGGING PHASE.  FULL COMMERCIAL FGD SYSTEM OPERATION IS
                          EXPECTED IN JUNE.


                                                                             744
                                            13-929

-------
UTILITY FSD SURVEY: OCTOBER 1933 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 1 (CONT.)
	__„	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  Y. REMOVAL    PER   BOILER   FGD   CAP.
                                                                S02   PART. HOURS  HOURS   HOURS  FACTOR
«—«»_ ««B_— _«c~ «> « « W—«> »_ __«_V« • •••••»«»•••••••« «_»«_H»—— «=—>——> —  W«KH _»««  MV«~«  _«__  «MWM

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         OVER THE APRIL-MAY PERIOD 22 DAYS OF DATA WERE ACCUMULATED  FOR  THE FGD
                         SYSTEM.  DURING THIS PERIOD THE BOILER WAS OUT OF SERVICE SEVEN HOURS AND
                         THE FGD SYSTEM 28 HOURS FOR UNSCHEDULED CORRECTIONS.  THE SYSTEM HAS  STILL
                         NOT STABILIZED.  NO MAJOR FGD SYSTEM PROBLEMS WERE  REPORTED.

 6/78  SYSTEM                                                                720

 7/78  SYSTEM                                                                744

       #* PROBLEMS/SOLUTIONS/COMMENTS

                          A HIGH PRESSURE DROP ACROSS THE VENTURIS PREVENTED FULL FLUE GAS FLOW
                          THROUGH THE FGO SYSTEM IN JUNE AND JULY.

 8/78  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE HIGH VENTURI PRESSURE DROP REPORTED FOR JULY WAS LOWERED BY ADJUSTING
                          INTERNAL PLUMB BOBS IN THE VENTURI THROATS.

                          REPAIRS WERE MADE TO THE MIST ELIMINATORS WHILE THE MODULES WERE DOWN
                          FOR VENTURI PLUMB BOB ADJUSTMENTS.

 9/78  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          A FIRE IN THE START-UP TRANSFORMER DUCT BANK CAUSED A TWO  WEEK BOILER
                          OUTAGE.

 10/78  SYSTEM                                                                744

       *» PROBLEMS/SOLUTIONS/COMMENTS

                          HEAT  TRACING FAILURES ALLOWED LINE FREEZING TO OCCUR.

                          SOME  SULFUR PRODUCT HAS BEEN PRODUCED BUT THE CHEMICAL  PLANT OPERATIONS
                          HAVE  NOT YET BEEN OPTOMIZED.

                          SHAKEDOWN/DEBUGGING OPERATIONS ARE CONTINUING.

 11/78  SYSTEM                                                                720

 12/78  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         ALTHOUGH THE FGD SYSTEM HAS BEEN OPERATING,  WEATHER-RELATED PROBLEMS  HAVE
                         LIMITED OPERATIONS TO TWO MODULES.

 1/79  SYSTEM

 2/79  SYSTEM                                                                672

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         FREEZE UPS RESULTED IN REHEATER LEAKS LIMITING ABSORBER  OPERATIONS.

 3/79  SYSTEM                                                                744

 4/79  SYSTEM                                                                720
                                             13-930

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
 5/79  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
                                                           744
 7/79  SYSTEM
 8/79  SYSTEM
 9/79  SYSTEM
       HOURS ARE NOT YET AVAILABLE BECAUSE THE UTILITY IS CONCENTRATING EFFORTS
       ON OPERATION OF THIS NEW UNIT.   THE UTILITY REPORTED THAT THE SCRUBBING
       MODULES THEMSELVES ARE OPERATING ACCEPTABLY.  ALSO THE CHEMICAL PLANT IS
       AVAILABLE AND THERE IS NO SYSTEM PLUGGING WHATSOEVER.

       THE MAJOR PROBLEM ENCOUNTERED WAS FAN VIBRATION.  THE UTILITY HAS BEEN
       WORKING WITH THE SUPPLIER IN AN EFFORT TO DISCOVER WHY FAN BALANCE HAS
       BEEN DIFFICULT TO MAINTAIN.

                                                           744

                                                           744
                                                                             720
       ** PROBLEMS/SOLUTIONS/COMMENTS
 10/79  SYSTEM

 11/79  SYSTEM

 12/79  A
       B
       C
       D
       SYSTEM
  3/80
                         DURING THE THIRD QUARTER THE UNIT OPERATED WITH TWO ABSORBERS.  ALL FOUR
                         ABSORBERS HAVE BEEN LARGELY AVAILABLE.  ONE ABSORBER WAS DOWN DUE TO
                         BOOSTER BLOWER VIBRATION PROBLEMS.

                                                                             744
 94.0
100.0
   .0
 30.0
100.0
 79.0
 67.4
   .0
  5.8
 76.1
23.8
20.3
  .0
 1.8
23.0
                                                           720
744   224
             171
       »* PROBLEMS/SOLUTIONS/COMMENTS

                         NOTE: SEE COMMENTS FOR 00/78 EXPLAINING SYSTEM DEPENDABILITY CALCULATIONS.

                         A REHEATER PROBLEM HAS LIMITED SCRUBBING OPERATIONS TO TWO TO THE FOUR
                         ABSORBER MODULES.  IF THE BOILER WERE TO OPERATE AT A HIGHER LOAD THE
                         REHEATERS WOULD BE UNABLE TO BOOST THE TEMPERATURE OF THE FLUE GAS ABOVE
                         DEW POINT.  THE FGD SYSTEM HAS BEEN  LIMITING UNIT MWH PRODUCTION.
  1/80  A
       B
       C
       D
       SYSTEM

  2/80  A
       B
       C
       D
       SYSTEM
 81.0
 96.0
   .0
 83.0
100.0

   .0
 99.0
  3.0
 99.0
100.0
       A
       B
       C
       D
       SYSTEM
   .0
100.0
 58.1
 97.5
100.0
 51.0
 42.3
   .0
 79.3
 86.3
 94.3
  2.5
 97.6
 97.2

   .0
 50.4
 82.8
 85.5
100.0
                        100.0
41.8
34.7
  .0
65.1
70.8

  .0
85.9
 2.3
88.9
88.6

  .0
17.6
29.2
30.1
38.5
744   610    527
696   634    616
                                                           744   262    286  31.0
                                             13-931

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 1 (CONT.)
_„	PERFORMANCE DATA	•	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL    PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         SCRUBBER OPERATIONS AT UNIT ONE ARE STILL LIMITED TO TWO MODULES BECAUSE
                         OF THE CURRENT LACK OF REHEATER CAPACITY.

 4/80
  5/80
  6/80
  7/80
A
B
C
D
SYSTEM
.0
98.2
50.0
91.7
100.0
.0
71.5
7.2
71.5
75.1 100.0
.0
48.2
4.9
48.2
50.7
                                                                             720   485
                                                                 365  55.8
       **  PROBLEMS/SOLUTIONS/COMMENTS
A
B
C
D
SYSTEM
*» PROBLE


A
B
C
0
SYSTEM
** PROBLE


A
B
C
D
SYSTEM
73.1
99.7
75.5
80.2
100.0
[MS/SOLUT


2.8
96.9
82.5
.1
91.2
:MS/SOLUT


.0
30.4
89.2
82.8
100.0
62.1
37.2
71.8
19.9
95.5
IONS/COMMEN-
BOOSTER BL(
THERE WAS 1
2.5
92.0
79.2
.2
87.0
IONS/COMMEN"
A BOILER T\
REPAIR WORl
.0
16.0
87.9
79.6
91.7
                         ONLY TWO MODULES ARE NEEDED AT THE PRESENT TIME TO MEET CURRENT S02
                         EMISSION REGULATIONS (SEE COMMENTS FOR 00/78).

                         A TUBE WALL  LEAK FORCED THE BOILER OUT OF SERVICE DURING APRIL.

                         HIGH VIBRATIONS IN THE BOOSTER BLOWER IN MODULE D FOLLOWED AFTER THE UNIT
                         OUTAGE.

                         HIGH VIBRATIONS IN THE BOOSTER BLOWER CAUSED MODULE A TO BE UNAVAILABLE
                         THE ENTIRE MONTH.

                         REPAIR AND MAINTENANCE OF THE BOOSTER BLOWER AND ISOLATION DAMPERS IN
                         MODULE C WERE  PERFORMED DURING APRIL.
                                                       55.9
                                                       33.5
                                                       64.7
                                                       17.9
                                          100.0        86.0                  744   670    640  87.4
BOOSTER BLOWER VIBRATIONS ARE CONTINUING IN ALL THE MODULES.

THERE WAS A UNIT OUTAGE SO THAT REPAIR WORK COULD BE UNDERTAKEN ON THE ESP.

                               2.1
                              75.6
                              65.0
                                .1
                  79.8        71.4                  720   591    514  65.4
A BOILER TUBE LEAK FORCED THE UNIT OUT OF SERVICE IN JUNE.

REPAIR WORK WAS DONE ON THE ISOLATION DAMPERS DURING JUNE.

                                .0
                              16.0
                              87.9
                              79.6
                              91.7                  744   744
                                                                                           683  91.7
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          MODULE  A WAS UNAVAILABLE  IN JULY  BECAUSE OF  REPAIRS  MADE  TO THE ISOLATION
                          DAMPER  AND THE  LOWER CHIMNEY  SEAL.

                          MODULE  B WAS FORCED OUT BECAUSE OF HIGH VIBRATIONS IN  THE BOOSTER BLOWER.
                                             13-932

-------
                                                  UTILITY FSD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 1 CCONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  '/. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         VIBRATIONAL PROBLEMS ALSO KEPT MODULE D OFF LINE UNTIL JULY 4, WHEN THE
                         BOOSTER BLOWER WAS BALANCED.
 8/80
 9/80
A
B
C
D
SYSTEM
              .0
            21.5
            91.1
                                 .0
                               21.5
                               77.8
                               90.1
                               94.7
           100.0

»* PROBLEMS/SOLUTIONS/COMMENTS
                                           93.2
              .0
            21.5
            77.8
            90.1
            94.7
                                                                             744   744
                                                                                          704  82.0
                         MODULE A DID NOT OPERATE IN AUGUST BECAUSE OF REPAIRS MADE TO THE LOWER
                         CHIMNEY SEAL.

                         MODULE B WAS OUT OF SERVICE FOR OVER 3 WEEKS TO CLEAN, PAINT, AND BALANCE
                         THE BOOSTER BLOWER ROTOR.

                         CRACKED WELDS ON THE WATER INLET NOZZLES WERE REPAIRED ON MODULE C.
A
B
C
D
SYSTEM
.0
37.2
39.4
45.1
60.9
.0
57.4
56.1
71.8
92.7
.0
31.4
30.7
39.3
94.8 50.7
                                                                             720   394
                                                                                          365  43.5
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         HIGH VIBRATIONS IN THE BOOSTER BLOWER CAUSED MODULE C TO SHUT DOWN FOR
                         PART OF SEPTEMBER.

                         THE FGD SYSTEM WAS DOWN FOR SEVERAL DAYS BECAUSE OF BOILER RELATED
                         PROBLEMS.

                         THE BOILER AND FGD SYSTEM WENT DOWN ON SEPTEMBER 18, 1980 FOR SCHEDULED
                         MAINTENANCE AND WERE UNAVAILABLE THE REST OF THE MONTH.
 10/80  A
       B
       C
       D
       SYSTEM
            27.0
            48.9
            43.5
            37.6
            50.8
                        38.4
                        68.2
                        69.6
                        17.1
                        73.3
73.7
26.5
47.0
48.0
11.8
50.0
                                  744   513
376  58.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE BOILER WAS OUT OF SERVICE FROM OCTOBER 1 TO OCTOBER 3 FOR A
                         SCHEDULED OVERHAUL.

                         A REHEAT TUBE LEAK CAUSED THE UNIT TO SHUTDOWN FROM OCTOBER 5 TO OCTOBER
                         11.  SCRUBBER MODULES B AND C WERE RETURNED TO OPERATION ON OCTOBER 14.
                         MAINTENANCE ON MODULE D WAS NOT COMPLETED UNTIL OCTOBER 19 AND MODULE A
                         ON OCTOBER 23.
11/80 A
B
C
D
SYSTEM
88.6
91.1
94.9
93.6
96.1
53.7
84.4
59.4
86.4
86.4
48.8
76.5
53.9
19.3
95.8 78.3
                                                                             720   653
                                                                                          564  69.6
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         ALL FOUR ABSORBER MODULES WERE AVAILABLE FOR MOST OF NOVEMBER EXCEPT FOR
                         MINOR OUTAGES CAUSED BY COMPUTER PROBLEMS.

                         A TOTAL POWER FAILURE OCCURRED ON NOVEMBER 14 CAUSING THE UNIT TO BE OFF
                                            13-933

-------
UTILITY F6D SURVEYS OCTOBER 1983 - SEPTEMBER

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 1 (CONT. )
_-_	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD   CAP.
                                                                502  PART. HOURS  HOURS   HOURS  FACTOR
12/80
  2/81
  3/81
                         LINE FOR FOUR DAYS.
       A           96.4        83.0
       B           85.6        80.2
       C           96.5        75.3
       D              .0          .0
       SYSTEM     100.0        90.1

       ** PROBLEMS/SOLUTIONS/COMMENTS
99.*
            81.3
            78.6
            73.8
              .0
            88.3
744   729
657  73.3
                         UNIT 1 WAS DOWN FROM DECEMBER 20 TO 22 IN ORDER TO TIE  IN THE UNIT 4 MAIN
                         TRANSFORMER.

                         THE "D" MODULE WAS DOWN THE ENTIRE MONTH SO THAT THE BOOSTER BLOWER ROTOR
                         COULD BE CLEANED AND BALANCED.  THE ABSORBER RECIRCULATING  PUMP DISCHARGE
                         VALVE WAS ALSO REPAIRED DURING THE MONTH.
1/81 A
B
C
D
SYSTEM
98.9
99.2
98.3
.0
100.0
96.3
97.0
94.0
.0
99.0 100.0
9*. 3
95.0
92.1
.0
97.0
                                                                              744    729
                                               722  87.0
       **  PROBLEMS/SOLUTIONS/COMMENTS
                         DURING JANUARY THE BOILER WAS OUT OF SERVICE APPROXIMATELY  15 HOURS TO
                         REPAIR THE  LEAK IN THE BOILER FEEDWATER PUMP DISCHARGE  LINE.

                         MODULE D WAS OUT OF SERVICE DURING JANUARY TO CLEAN  AND BALANCE  THE BOOSTER
                         BLOWER ROTOR.
A
B
C
D
SYSTEM
79.9
97.3
29.6
67.4
98.0
73.7
93.1
26.8
43.9
92.0
67.3
85.0
24.4
40.0
96.0 84.0
                                                                              672    613
                                               565  75.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         DURING  FEBRUARY THE BOILER WAS DOWN APPROXIMATELY  72  HOURS  TO REPAIR  THE
                         AIR DUCT TO THE COAL MILL AND BECAUSE OF CONTAMINATED CONDENSATE  AND  BOIL-
                         ER FEEDWATER.

                         MODULES A  AND  C WERE DOWN APPROXIMATELY 72  HOURS DUE  TO  LACK  OF DEMAND.
                         MODULE  C REMAINED DOWN  APPROXIMATELY 384 HOURS  DUE TO THE REPAIRS OF  THE
                         ISOLATION  DAMPER.

                         MODULE  D WAS IN SERVICE ON MARCH  2, 1981 AFTER  ISOLATION DAMPER REPAIRS
                         WERE  COMPLETED.

                         MODULE  D EXPERIENCED A  72 HOUR OUTAGE DUE TO  LOW BOILER  LOAD.  THE OUTAGE
                         CONTINUED  FOR  APPROXIMATELY  96 HOURS TO BALANCE THE BOOSTER BLOWER ROTOR.
A
B
C
D
SYSTEM
97.4
95.0
27.0
.0
100.0
76.8
55.4
22.9
.0
66.0 82.0
34.7
25.0
10.3
.0
30.0
                                                                              744   336
                                                223   38.0
        «*  PROBLEMS/SOLUTIONS/COMMENTS

                          DURING  MARCH  OPERATION  OF  MODULE  C  WAS ERRATIC DUE TO SEVERAL BOILER TRIPS.

                          MODULE  D  WAS  OUT  OF  SERVICE  THE ENTIRE MONTH  TO BALANCE THE BOOSTER BLOWER
                                             13-934

-------
                                                  UTILITY FED SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PUBLIC SERVICE OF NEW MEXICO:  SAN JUAN 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                                                X REMOVAL
                                                                S02  PART.
                                                          PER  BOILER  FGD   CAP.
                                                         HOURS HOURS  HOURS FACTOR
                         ROTOR.

                         THE BOILER WAS OUT OF SERVICE FROM MARCH 5 UNTIL MARCH 24 DUE TO A SCHED-
                         ULED OUTAGE.  ADDITIONAL OUTAGE TIME ON MARCH 30 WAS DUE TO A LOSS OF
                         POWER FEED FROM THE MAIN TRANSFORMER.

                         AN ADDITIONAL 24 HOURS OF OUTAGE TIME WAS DUE TO THE MALFUNCTION OF THE
                         ESP.
 4/81
A
B
C
D
SYSTEM
96.9
92.2
96.7
8.5
100.0
94.0
82.9
94.0
9.5
99.0
                                                       64.2
                                          100.0
                                     74.3
                                     84.2
                                      8.5
                                     89.0
                                                                             720   645
                                                           641   88.0
          PROB LEMS/SO LUTIONS/COMMENTS
 S/81
A
B
C
0
SYSTEM
97.0
94.8
29.2
95.2
100.0
63.6
90.6
28.9
93.7
100.0
       DURING APRIL THE BOOSTER BLOWERS TRIPPED NUMEROUS TIMES BECAUSE  OF  COMPUTER
       PROBLEMS AND FOR REASONS UNKNONW.

       MODULE D REMAINED OUT OF SERVICE UNTIL APRIL 23,  DUE TO THE  BALANCING
       OF THE BOOSTER BLOWER AND THE REPAIRING OF THE SCREW DRIVE ON  THE INLET
       ISOLATION DAMPER.

       THE BOILER WAS OUT FO SERVICE APPROXIMATELY 72 HOURS TO REPAIR A WATERWALL
       TUBE LEAK.

                                     63.6
                                     90.6
                                     28.9
                                     93.7
                        100.0       100.0                  744  744    744  98.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
 6/81
A
B
C
0
SYSTEM
60.7
63.1
27.1
58.2
64.7
31.8
41.3
13.3
31.2
45.0
       DURING MAY MODULE C EXPERIENCED SOME OUTAGE TIME DUE TO A BROKEN JACK SCREW
       ON THE ISOLATION DAMPER.

                                     27.5
                                     35.7
                                     11.5
                                     26.9
                         50.8        38.9                  720   622    280  80.0
       ** PRCBLEMS/SOLUTIONS/COMMENTS
                         DURING JUNE ALL THE MODULES WERE DOWN PART OF THE MONTH FOR INSTRUMENT
                         AIR TIE-IN AT THE FLYASH FILTERS AND BECAUSE OF A MULTIPLEXER FAILURE.

                         MODULE C INLET ISOLATION DAMPER REPAIRS WERE PERFORMED DURING THE MONTH.

                         MODULE D WAS UNAVAILABLE PART OF THE MONTH WHILE THE BOOSTER BLOWER ROTOR
                         WAS BALANCED.
  7/81
       A
       B
       C
       D
       SYSTEM
 54.8
 97.2
 99.5
 99.7
100.0
  .0
92.5
88.0
89.8
97.0
100.0
  .0
92.2
87.8
89.5
96.0
744   742
                                   717  81.0
                                            13-935

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 1 (CONT.)
—.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                              '/. REMOVAL   PER  BOILER  FGD   CAP.
                                              S02  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
8/81




9/81




A
B
C
D
SYSTEM
A
B
C
D
SYSTEM
100.0
100.0
100.0
99.9
100.0
100.0
98.5
99.2
99.4
100.0
.0
98.9
97.8
95.8
100.0
.0
57.2
71.2
67.0
75.0
                         MODULE A WAS UNAVAILABLE FOR PART OF JULY AS A RESULT  OF  PROBLEMS  WITH
                         THE INLET ISOLATION DAMPER.

                                                          .0
                                                       98.9
                                                       97.8
                                                       95.8
                                          100.0       100.0                   744    744    744  86.0

                                                          .0
                                                       24.3
                                                       30.3
                                                       28.5
                                           90.0        32.0                   720    701    228  82.0
       «* PROBLEMS/SOLUTIONS/COMMENTS
                         THE UNIT WAS REMOVED FROM SERVICE FROM SEPTEMBER  11 TO  SEPTEMBER  28 FOR
                         A SCHEDULED FALL OUTAGE.
 10/81
       A
       B
       C
       D
       SYSTEM
 94.5
 98.0
 87.1
 83.3
100.0
72.8
72.6
53.8
76.6
95.6
                                          100.0
72.8
72.6
53.8
76.6
95.6
                                                                              744    744
                                                                        711  90.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
 11/81
A
B
C
D
SYSTEM
98.1
100.0
100.0
99.6
100.0
86.9
56.7
.0
88.7
95.0
                         SEVERAL OUTAGES DURING OCTOBER WERE DUE TO  ESP  PROBLEMS.
                                                       73.9
                                                       48.2
                                                          .0
                                                       75.4
                                          100.0        81.0                   720    612
                                                                        583  65.0
        **  PROBLEMS/SOLUTIONS/COKMENTS
12/81




A
B
C
D
SYSTEM
86.8
98.8
87.1
98.9
98.9
12.0
74.4
.0
78.1
78.1
                         THE UNIT WAS OFF-LINE APPROXIMATELY  FOUR DAYS DUE  TO  ECONOMIZER  TUBE
                         LEAKS.

                         THE B MODULE WAS TAKEN OFF-LINE APPROXIMATELY NINE DAYS DURING NOVEMBER
                         DUE TO A LACK OF STACK REHEAT.

                                                        3.9
                                                       24.2
                                                          .0
                                                       25.4
                                          100.0        25.4                  744   242    189   28.0
        *»  PROBLEMS/SOLUTIONS/COMMENTS
                          DURING  DECEMBER  THE  UNIT WAS TAKEN OFF-LINE  FOR  THREE  WEEKS TO REPAIR THE
                          TURBINE.

                          MODULE  A  WAS  DOWN  PART  OF  THE  MONTH  WHILE  BALANCING THE BOOSTER BLOWER
                          ROTOR.
  1/82   A
        B
 97.8
 98.7
64.0
83.9
45.4
59.5
                                             13-936

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO:  SAN JUAN 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

       C           89.5        79.2                    56.2
       D           58.1          .0                      .0
       SYSTEM     100.0        92.0        99.0        65.0                  744   528    487  40.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF-LINE FROM JANUARY 1 THRU JANUARY 9 TO COMPLETE TURBINE
                         BEARING REPAIRS AND COUPLING ALIGNMENT.

                         MODULE C WAS UNAVAILABLE FOR 78 HOURS TO BALANCE THE BOOSTER BLOWER ROTOR.

                         MODULE D WAS OFF-LINE 312 HOURS BECAUSE THE INLET ISOLATION DAMPER WAS
                         INOPERATIVE.
2/82




A
B
C
D
SYSTEM
90.0
99.1
93.1
.0
94.0
76.8
79.1
87.0
.0
91.0
75.4
76.8
84.4
.0
96.0 88.0
                                                                             672   652    591  80.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM OPERATION WAS SUSPENDED ON FEBRUARY Z THRU FEBRUARY 4 DUE
                         TO ESP PROBLEMS.

                         ON FEBRUARY 4 THRU FEBRUARY 8 THE FGD SYSTEM OPERATION WAS LIMITED TO TWO
                         MODULES DUE TO THE LACK OF STACK GAS REHEAT (HIGH WATER CONSUMPTION).

                         MODULE D EXPERIENCED INLET DAMPER PROBLEMS CAUSING ADDITIONAL DOWN TIME.
3/82 A
B
C
D
SYSTEM
97.0
99.9
99.7
54.8
100.0
92.0
91.3
92.7
.0
97.0 100.0
69.8
69.2
70.3
.0
74.0
                                                                             744   564    547  65.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS TAKEN OFF LINE TO PERFORM REPAIRS ON THE BURNER.

                         NUMEROUS TRIPS OF MODULE A WAS DUE TO THE BOOSTER BLOWER.

                         MODULE D WAS OUT OF SERVICE FROM MARCH 1 TO MARCH 15 DUE TO REPAIRS TO THE
                         INLET DAMPERS.

                         MODULE D WAS TAKEN OFF-LINE ON MARCH 30 TO BALANCE THE BOOSTER BLOWER ROTOR
4/82 A
B
C
D
SYSTEM
98.2
96.8
97.1
92.8
99.0
75.0
54.5
78.9
77.9
99.0 100.0
68.1
49.4
71.5
70.7
90.0
                                                                             720   653    648  81.0

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF-LINE FOR THREE DAYS DURING APRIL DUE TO ECONOMIZER TUBE
                         LEAKS.

                         MODULE D WAS OUT OF SERVICE FOR THREE DAYS TO REPLACE THE INBOARD MOTOR
                         OIL SEAL AND BEARING ON THE BOOSTER BLOWER.

 5/82  A           98.8        80.1                    77.0
       B           99.7        29.4                    28.2
                                            13-937

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 1 (CONT.)
	-PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL    PER  BOILER   FGD   CAP.
                                                                S02   PART. HOURS HOURS   HOURS FACTOR
 6/82
  7/82
  8/82
  9/82
 10/82
       C
       D
       SYSTEM
 99.7
990.0
100.0
50.0
60.0
95.0
48.0
57.5
91.0
                                                                      744   715    678  52.0

** PROBLEMS/SOLUTIONS/COMMENTS

                  DURING MAY THE UNIT WAS OPERATED AT REDUCED CAPACITY DUE TO MILL PROBLEMS.
       A
       B
       C
       D
       SYSTEM
 66.7
 67.8
 43.2
 64.9
100.0
25.9
50.7
  .1
60.1
68.4
25.7
50.3
  .1
59.6
67.8
                                                                      720   714
489  46.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         ALL ABSORBERS WERE OUT OF SERVICE FROM JUNE 9 THROUGH JUNE  18 DUE TO
                         COMPUTER PROBLEMS.

                         MODULE C WAS DOWN FROM JUNE 23 THROUGH JUNE 30 TO BALANCE A BOOSTER FAN
                         ROTOR AND TO REPLACE ITS BEARINGS.
A
B
C
0
SYSTEM
95.4
.0
47.8
90.7
100.0
92.5
.0
38.7
83.0
100.0
90.1
.0
37.6
80.8
100.0
                                                                              744    724
                                                                                           744  69.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          MODULES B AND C WERE DOWN DURING JULY TO REPLACE BEARINGS  IN  THE BOOSTER
                          FAN MOTOR.
A
B
C
D
SYSTEM
97.7
.0
97.8
97.8
100.0
91.1
.0
90.0
90.7
100.0
89.8
.0
88.7
89.4
100.0
                                                                              744    733
                                                                        744  80.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         MODULE B WAS DOWN FROM AUGUST 1 TO AUGUST 31 TO REPLACE A BEARING  IN A
                         BOOSTER FAN MOTOR.
A
B
C
D
SYSTEM
56.7
.0
56.7
56.7
85.0
98.7
.0
98.7
99.4
100.0
21.7
.0
21.7
21.8
32.6
                                                                              720    158     235   31.2

        «* PROBLEMS/SOLUTIONS/COMMEMTS

                          THE  UNIT  WAS  DOWN  DURING  PART OF SEPTEMBER DUE TO  A  CHEMICAL PLANT OUTAGE.

                          A  BOILER  TUBE LEAK ALSO CONTRIBUTED TO  THE UNIT  OUTAGE IN SEPTEMBER.

                          MODULE  B  WAS  DOWN  DURING  THE MONTH FOR  REPAIRS ON  A  BOOSTER FAN MOTOR.
A
B
C
D
SYSTEM
.0
.0
18.8
12.5
15.7
.0
.0
53.2
41.8
47.5
.0
.0
11.3
8.9
10.1
                                                                              744   158
                                                                         75  10.0
                                             13-935

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  '/. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT MAS DOWN FROM OCTOBER 1 TO OCTOBER 24 FOR A SCHEDULED OVERHAUL.

                         THE FGD SYSTEM RESUMED OPERATION ON OCTOBER 28 FOLLOWING A CHEMICAL PLANT
                         OUTAGE.

11/82  A           78.6        30.6                    28.1
       B           56.3         4.1                     3.8
       C           97.8        94.6                    86.8
       D           80.1        86.4                    79.3
       SYSTEM     100.0       100.0                    99.0                  720   661    713  76.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE B WAS DOWN FROM NOVEMBER 18 TO NOVEMBER 30 TO REPAIR A DRIVE MOTOR
                         ON AN INLET ISOLATION DAMPER.

                         ONLY TWO MODULES OPERATED DURING THE PERIOD DUE TO A LACK OF STACK REHEAT.

                         THE UNIT HAS DOWN FROM NOVEMBER 28 TO NOVEMBER 30 TO REPAIR AN ECONOMIZER
                         TUBE LEAK.

                         MODULE A MAS DOWN FROM NOVEMBER 1 TO NOVEMBER 5 TO REPAIR AN INLET
                         ISOLATION DAMPER.

12/82
A
B
C
D
SYSTEM
91.3
62.2
97.7
96.2
100.0
68.1
4.4
60.7
90.1
100.0
66.5
4.3
59.3
88.0
100.0
                                                                             744   727    744  89.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE A WAS OUT OF SERVICE FROM DECEMBER 4 TO DECEMBER 6 TO BALANCE A
                         BOOSTER FAN ROTOR.

                         MODULE B MAS DOWN FROM DECEMBER 1 TO DECEMBER 10 TO REPAIR A BOOSTER FAN
                         MOTOR.

                         ONLY TWO MODULES OPERATED DURING MOST OF THE MONTH DUE TO A LACK OF STACK
                         REHEAT.
  1/83
A
B
C
D
SYSTEM
83.4
39.9
75.1
92.2
98.6
82.5
22.2
49.0
81.6
78.4
71.5
19.2
42.5
70.7
68.0
  2/83
                                                                             744   645    506  77.0

       «# PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN AT VARIOUS TIMES DURING JANUARY DUE TO BOILER-RELATED
                         PROBLEMS.

                         AS OF JANUARY 1, 1983 THE NUMBER OF MODULES COMPRISING THE TOTAL FGD SYSTEM
                         CHANGED FROM TWO TO THREE.
                                                                             672   649    645   90.0
A
B
C
D
SYSTEM
99.0
99.0
96.0
99.0
100.0
99.4

99.4
99.4
99.4
96.0

96.0
96.0
96.0
                                            13-939

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 1 (CONT.)
...	PERFORMANCE DATA—	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL    PER   BOILER   FGD    CAP.
                                                                502   PART. HOURS  HOURS   HOURS  FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
 3/83
  4/83
                         THE UNIT WAS OUT OF SERVICE FROM FEBRUARY 26 TO FEBRUARY  27 DUE TO BOILER
                         RELATED PROBLEMS.

                         MODULE B WAS DOWN DURING FEBRUARY TO REPAIR AN ABSORBER TRAY  LEAK.
A
B
C
D
SYSTEM
98.9
62.0
32.9
98.0
97.3
100.0
63.3
36.0
100.0
99.8
95.0
57.9
32.9
91.9
92.6
                                                                             744   681    689  83.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN FROM MARCH 25 TO MARCH 27 DUE TO BOILER-RELATED PROBLEMS.

                         MODULES B AND C WERE OUT OF SERVICE DURING PART OF MARCH DUE TO REPAIRS ON
                         LEAKING COLLECTOR TRAYS.
A
B
C
D
SYSTEM
50.0
98.1
54.0
99.0
100.0
54.1
100.0
54.1
100.0
100.0
50.0
96.9
50.0
96.9
97.9
                                                                             720   665     720  67.0

        **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN DURING PART OF PARIL TO REPAIR A BOILER TUBE  LEAK.

                         MODULES A AND C WERE DOWN DURING PART OF APRIL TO REPAIR ABSORBER TRAY
                         LEAKS.
5/83 A
B
C
D
SYSTEM
71.0
68.0
84.0
29.0
90.7
74.9
95.7
95.7
32.2
99.5
65.1
83.1
83.1
28.0
86.5
                                                                              744   646
                                                                        744  71.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          THE  UNIT  WAS  DOWN  FOR APPROXIMATELY THREE DAYS  DURING  MAY  TO  REPAIR  A
                          BOILER  TUBE LEAK.

                          THE  UNIT  TRIPPED ON MAY  20 DUE TO A LOSS OF  POWER  TO THE BOILER  BURNER
                          CONTROL.

                          THE  UNIT  WAS  REMOVED FROM SERVICE ON MAY 21  TO  REPAIR  A COMPUTER-RELATED
                          MALFUNCTION.

                          A  UNIT  TRIP OCCURRED ON  MAY  24 DUE TO COMPUTER-RELATED PROBLEMS  AT MODULES
                          A  AND B.

                          MODULES A AND D WERE DOWN DURING PART OF MAY TO REPAIR ABSORBER  TRAY LEAKS.
  6/83   A
        B
        C
        D
        SYSTEM
 52.9
 93.1
 99.0
 56.9
100.0
49.0
93.1
99.0
56.9
99.3
49.0
93.1
99.0
56.9
99.3
                                                                              720   720
                                                                        720  86.0
                                             13-940

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  V. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULES A AND D WERE DOWN DURING PART OF JUNE TO INSTALL SUMP LEVEL
                         DETECTORS.

                         MODULES A AND D WERE OUT OF SERVICE DURING PART OF THE MONTH TO REPAIR
                         ABSORBER TRAY LEAKS.

                         MODULE D WAS DOWN DURING PART OF JUNE DUE TO BLOWER VIBRATIONS.

                         THE UTILITY REPORTED THAT NO MAJOR OUTAGES OCCURRED DURING JUNE.

 7/83  A           98.0        91.0                    65.1
       B           68.0        88.2                    63.0
       C           57.9        79.7                    57.0
       D           81.0        60.2                    43.0
       SYSTEM     100.0       100.0                    76.0                  744   532    566  60.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OUT OF SERVICE APPROXIMATELY 10 DAYS DURING JULY DUE TO
                         BOILER-RELATED PROBLEMS.

                         THE UNIT MAS DOWN FROM JULY 29 TO 31 FOR REHEATER TUBE LEAK REPAIRS.

                         MODULE B WAS DOWN DURING PART OF JULY FOR MIST ELIMINATOR PAD REPAIRS.

                         MODULES C AND D WERE DOWN DURING PART OF THE MONTH DUE TO BOOSTER FAN
                         BALANCING PROBLEMS.

 8/83
A
B
C
D
SYSTEM
97.0
16.9
75.0
88.0
92.3
75.9
16.0
27.0
83.0
67.3
100.0
22.8
38.2
100.0
87.0
72.6
15.3
25.8
79.3
64.3
                                                                             744   711    479  86.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN FROM AUGUST 1 TO 2 FOR REHEATER TUBE LEAK REPAIRS.

                         MODULE A WAS DOWN DURING PART OF AUGUST FOR CONTROL INSTRUMENTATION RE-
                         PAIRS.

                         MODULE B WAS DOWN DURING PART OF AUGUST FOR MIST ELIMINATOR PAD REPAIRS.

                         MODULE C WAS DOWN DURING PART OF THE MONTH DUE TO OUTLET DAMPER REPAIRS.

                         MODULE 0 WAS OUT OF SERVICE DURING PART OF AUGUST TO REPAIR EXPANSION JOINT
                         LEAKS.
9/83 A
B
C
D
SYSTEM
100.0
80.3
81.9
90.0
100.0
97.9
77.1
22.9
88.0
95.3
100.0
84.5
100.0
100.0
100.0
90.7
71.4
21.3
81.5
88.3
                                                                             720   667    636  77.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN FOR APPROXIMATELY 5 DAYS DURING SEPTEMBER DUE TO BOILER-
                         RELATED PROBLEMS.

                         MODULE B WAS DOWN DURING PART OF SEPTEMBER FOR A MIST ELIMINATOR INSPECTION
                                            13-941

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL    PER   BOILER   FGD   CAP.
                                                                S02  PART. HOURS  HOURS   HOURS FACTOR

                         ABSORBER TRAYS WERE INSPECTED DURING SEPTEMBER AT MODULE B.

                         MODULE C WAS DOWN DURING PART OF SEPTEMBER DUE TO BOOSTER FAN PROBLEMS.

                         OUTLET DAMPER PROBLEMS CONTRIBUTED TO DOWN TIME AT  MODULE C DURING THE
                         MONTH.
10/83




11/83




A
B
C
D
SYSTEM
A
B
C
D
SYSTEM
98.9
98.9
98.9
9.0
100.0
.0
96.9
94.0
96.9
96.0
81.6
88.6
89.8
9.0
89.7
.0
95.0
92.9
95.0
94.3
81.6
88.6
98.7
100.0
100.0

95.0
92.9
95.0
94.3
28.0
30.4
30.8
3.1
30.7
.0
64.0
82.2
84.0
63.4
12/83
  1/84
  2/84
                                                                              744    255
                                                                             720   637
229  25.0
                                                                                          601  75.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY REPORTED THAT NO MAJOR FGO-RELATED PROBLEMS WERE  ENCOUNTERED
                         DURING OCTOBER AND NOVEMBER 1983.
A
B
C
D
SYSTEM
.0
96.4
94.4
96.4
95.7
.0
95.0
90.0
97.0
94.0

95.0
90.0
97.0
94.0
.0
94.4
89.4
96.4
93.4
                                                                             744   739
                                                                                          695  81.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         MODULE A WAS DOWN DURING DECEMBER DUE TO PROBLEMS WITH  LEAKAGE.
                                                                             744   743
A
B
C
D
SYSTEM
.0
99.7
98.7
99.7
99.4
.0
97.8
85.9
97.8
93.9

97.8
85.9
97.8
93.9
.0
97.7
85.8
97.7
93.7
697  82.8
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         MODULE A WAS UNAVAILABLE DURING JANUARY DUE TO SUMP  LEAKAGE.
                                                                             696   696
A
B
C
D
SYSTEM
95.0
98.0
99.0
3.0
98.3
93.0
98.0
99.0
2.0
97.3
100.0
100.0
100.0
20.0
100.0
93.0
98.0
99.0
2.0
97.3
                                                                                          677  88.8
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         MODULE D WAS DOWN DURING FEBRUARY FOR MIST ELIMINATOR REPAIRS.
3/84 A
B
C
D
SYSTEM
94.8
98.7
98.7
94.8
100.0
64.0
94.9
77.9
50.0
95.6
128.1
94.8
77.8
99.7
100.0
63.2
93.7
76.9
49.3
94.4
                                                                              744    735
702  87.3
                                            13-942

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                                         X REMOVAL
                                                         S02  PART.
                                                          PER  BOILER  FGD   CAP.
                                                         HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
 4/84
 5/84
                         A LACK OF REHEAT RESTRICTED FGD SYSTEM OPERATIONS AT MODULE D DURING
                         FEBRUARY AND MARCH.
A
B
C
D
SYSTEM
   .0
 78.2
 77.5
 77.5
 77.7
  .0
86.3
80.3
84.2
83.6
                                           87.0
                                           80.3
                                           84.2
                                           83.8
  .0
68.1
63.3
66.4
65.9
                                                                      720   568
                                                                        475   64.4
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         MODULE A HAS DOWN DURING APRIL FOR ABSORBER TRAY SEAL REPAIRS.
A
B
C
D
SYSTEM
 74.6
 85.5
 83.6
 98.5
100.0
                               65.9
                               76.9
                               65.9
                               72.9
                               93.8
            90
           100
            90
            94
                                   100.0
65.6
76.6
65.6
72.6
93.5
                                                                      744   741
                                                                        695   93.3
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         MODULE A MAS DOWN DURING THE MONTH FOR ABSORBER RECIRCULATING PUMP REPAIRS.

                         ALL MODULES MERE DOWN AT VARIOUS TIMES DURING MAY DUE TO MULTIPLEXER
                         PROBLEMS.
 6/84  A
       B
       C
       D
       SYSTEM
            41.0
            85.0
            91.9
            66.9
            95.0
             35.0
             80.0
             51.9
             50.0
             72.3
            55.5
            94.1
            56.5
            74.7
            93.6
35.0
80.0
51.9
50.0
72.3
                                                                            720    720

      »* PROBLEMS/SOLUTIONS/COMMENTS

                        NO MAJOR FGD-RELATED PROBLEMS MERE REPORTED DURING JUNE.

7/84  SYSTEM                                                                744

8/84  SYSTEM                                                                744

9/84  SYSTEM                                                                720

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        INFORMATION HAS UNAVAILABLE FOR THE THIRD QUARTER OF 1984.
                                                                                        521   85.0
                                             13-943

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGO SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

  ** UNIT DATA  - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE  GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

  ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH  CONTENT - V.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*»* PARTICLE CONTROL

  ** ESP
     NUMBER
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE  DROP - KPA
     PARTICLE  REMOVAL EFFICENCY - 7.

  «* PARTICLE SCRUBBER
     NUMBER
     NUMBER OF SPARES
     INITIAL START-UP DATE
     GENERIC TYPE
     SPECIFIC  TYPE
     TRADE NAME/COMMON NAME
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO -  LITER/CU.M
     PRESSURE  DROP - KPA
     SUPERFICIAL  GAS VELOCITY - M/S
PUBLIC SERVICE OF NEW MEXICO
SAN JUAN
Z
WATERFLOW
NEW MEXICO
A
   21.         (  .050 LB/MMBTU)
  228.         (  .530 LB/MMBTU)
*««***         (****** LB/MMBTU)
 1560
  350
  306
  322
  350
FOSTER WHEELER
PULVERIZED COAL
BASE
  725.78
  122.8
  122.
CONCRETE
    6.1
               (1538000 ACFM)
               (  253 F)
               (  400 FT)

               (  20.0 FT)
               (  9000 BTU/LB)
                8000-11628
COAL
SUBBITUMINOUS
20934.

   22.00
12.6-22.5
   10.50
6.1-15.0
     .80
0.6-1.3
     .03
0.00-0.09
HOT SIDE
WESTERN PREC. DIVISION, JOY
  943.8        (2000000 ACFM)
  371.1        (  700 F)
     .6        (  3. IN-H20)
   99.5
 4
 1
 8/78
VENTURI TOWER
VARIABLE-THROAT/BOTTOM-ENTRY PLUMB BOB
N/A
DAVY MCKEE
12.5 DIA X 28.0
CARBON STEEL
AISI 1110
INORGANIC
PREFIRED BRICK/SHAPES
STAINLESS STEEL
 1
  224.9        ( 3570 GPM)
     •9        ( 7.1 GAL/1000ACF)
    3.1        (12.5 IN-H20)
   48.8        (  160.0 FT/S)
                                             13-944

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PUBLIC SERVICE OF NEW MEXICO: SAN JUAN Z (CONT.)

     INLET GAS FLOW RATE - CU.M/S                 229.8
     INLET GAS TEMPERATURE - C                    134.4
     PARTICLE REMOVAL EFFICIENCY - 7.               75.0

*** FGD SYSTEM
               (  487000 ACFM)
               (   274 F)
 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN S02 REMOVAL EFFICIENCY - 7.
     ENERGY CONSUMPTION - 7.
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 »* ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     DISTANCE BETWEEN GAS CONTACTING ZONES - CM
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - 7.
SALEABLE PRODUCT
WET SCRUBBING
WELLMAN LORD
NONE
DAVY MCKEE
STEARNS-ROGER
FULL SCALE
RETROFIT
   90.00
    4.6
 1
 8/78
 8/78
 2/74
NR
NR
 4
 1
TRAY TOWER
VALVE TRAY
BUBBLE CAP TRAY TOWER
DAVY MCKEE
24.0 X 29.0 X 79.0
INORGANIC
HYDRAULICALLY-BONDED CONCRETE
PORTLAND CEMENT
INORGANIC
PREFIRED BRICK/SHAPES
ACID-RESISTANT BRICK I LOW H20 ABSORPTION!
VALVE TRAY
 5
    5.1        (    2.0IN)
   47.         (  750 GPM)
     .2        (1.7 GAL/1000 ACF)
    4.0        (16.0 IN-H20)
    3.3        ( 10.8 FT/S)
  198.67       ( 421000 ACFM)
   48.9        (  120 F)
   90.0
 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF PASSES PER STAGE
     PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH FREQUENCY
     WASH RATE - L/S
PRIMARY COLLECTOR
 4
IMPINGEMENT
BAFFLE
CLOSED VANE
HORIZONTAL
    1
     .0        (
    3.2        (
ORGANIC
POLYPHENYLENE
BLENDED
CONTINUOUS ON ONE
    3.8        (
 .0 IN-H20)
10.5 FT/S)
 * INTERMITTENT ON THE OTHER
  60 GAL/MIN)
                                            13-945

-------
UTILITY FGO SURVEYS OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 2 (CONT.)
 ** REHEATER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     TEMPERATURE INCREASE - C
     INLET FLUE GAS FLOW RATE -
     INLET FLUE GAS TEMPERATURE
CU.
- C
    M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOH RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     DIMENSIONS
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 «* TANKS
     SERVICE
      ABSORBER  RECYCLE

  ** PUMPS
      SERVICE
      ABSORBER  PRODUCT TRANSFER
      SCRUBBER  RECIRCULATION
      ABSORBER  RECIRCULATION
      ABSORBER  SPRAY  RECIRCULATION

  **  SOLIDS  CONCENTRATING/DEWATERING
      DEVICE

 ***  SALEABLE BYPRODUCTS
      NATURE
      FULL LOAD QUANTITY  - M T/H
      QUALITY - •/.
      DISPOSITION
INDIRECT HOT AIR
EXTERNAL HEAT EXCHANGER
STEAM TUBE BUNDLE
   27.8        (   50 F)
   62.67       ( 132800 ACFM)
   48.9        (  120 F)
STAINLESS STEEL
AUSTENITIC
                 4
                CENTRIFUGAL
                BUFFALO FORGE
                BOOSTER
                FORCED DRAFT
                DRY
                  276.06
                  122.8
                CARBON STEEL
               ( 585000 ACFM)
               (  253 F)
                NR
                NR
                NR
                NR
                NR
                NR
                NR
                ESP TO FANS
                16.0 X 24.0
                CARBON STEEL
                AISI 1110
                NR
                NR
                MIX TANK
                N/A
                AGITATED TANK
                NUMBER

                   1


                NUMBER
                   2
                   4
                  20
                   8
                NONE
                SULFURIC ACID
                    1.36
                   99.5
                MARKETED
               (  1.50 TPH)
                                             13-946

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1963 - SEPTEMBER
PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 2 (CONT.)
*»* SLUDGE


 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS


 »* DISPOSAL
     NATURE
     TYPE
     SITE TREATMENT


 ** PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     CONTROL LEVELS
     MONITOR LOCATION
     PROCESS CONTROL MANNER


 ** WATER BALANCE
     WATER LOOP TYPE
     PON3 SEEPAGE/RUNOFF WATER LOSS - LITERS/S
     MAKEUP WATER ADDITION - LITERS/S


 ** FGD SPARE CAPACITY INDICES
     ABSORBER - 7.


 ** FGD SPARE COMPONENT INDICES
     ABSORBER
                      N/A
                      N/A
                      N/A
                      N/A
                      NONE
                      N/A
                      PH 4 DENSITY
                      PH 5.5-6.5; SP.GR. 1.2-1.3
                      ABSORBER BLEED * PRODUCT SOLUTION
                      MANUAL
                      CLOSED
                      45
                         22.4
                         33.3
                                                    1.0
                                     (   355 GPM)
	PERFORMANCE DATA	

PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                      Y. REMOVAL   PER  BOILER  FGD   CAP.
                                      S02  PART. HOURS HOURS  HOURS FACTOR
 0/78  SYSTEM
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         NOTE: ALTHOUGH THIS FGD SYSTEM IS DESIGNED TO BRING THE BOILEK INTO COM-
                               PLIANCE WITH A 0.34 LB/MM BTU S02 EMISSION STANDARD, THE STATE HAS
                               INITIALLY ONLY REQUIRED A 1.2 LB/MM BTU S02 CONTROL LEVEL.  SAN
                               JUAN 2 WILL BE REQUIRED TO MEET THE MORE STRINGENT S02 EMISSION
                               LIMITATION VALUE BY APRIL 18, 1980.  THE UNIT ONLY REQUIRES TWO
                               OF THE FOUR SCRUBBING TRAINS TO MEET THE 1.2 LB/MM BTU LIMITATION
                               VALUE; HOWEVER, THREE ARE REQUIRED FOR THE MORE STRINGENT LIMITATION
                               VALUE (THE SYSTEM IS DESIGNED TO INCLUDE ONE SPARE SCRUBBING TRAIN
                               WHEN MEETING THE 0.34 LB/MM BTU S02 EMISSION STANDARD).  BECAUSE
                               OF THIS CHANGE IN EMISSION LIMITATION VALUES THE FGD SYSTEM WILL
                               EFFECTIVELY HAVE AN ABSORBER SPARE COMPONENT INDEX OF 2.0 (100X
                               SPARE CAPACITY FOR THIS SYSTEM) THROUGH APRIL 17, 1980 AND 1.0
                               (33.3X SPARE CAPACITY FOR THIS SYSTEM) THEREAFTER.  CONSEQUENTLY
                               THE "SYSTEM" DEPENDABILITY FACTORS WILL BE CALCULATED AS:
                                                  MODULAR AVERAGE X 2.0
                                           THROUGH APRIL 17, 1980 AND:
                                                  MODULAR AVERAGE X 1.33
                                           THEREAFTER.
 8/78  SYSTEM


       ** PROBLEMS/SOLUTIONS/COMMENTS
                                                   744
10/78  SYSTEM
INITIAL FGD OPERATIONS BEGAN IN LATE AUGUST.  SHAKEDOWN/DEBUGGING OPERA-
TIONS CONTINUED THROUGH AUGUST.


PROBLEMS WERE ENCOUNTERED WITH THE BOOSTER FAN CONTROL DAMPER.


                                                   744
                                            13-947

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 2 (CONT.)
_	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL    PER   BOILER   FGD   CAP.
                                                                S02   PART.  HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                          HEAT TRACING FAILURES ALLOWED  LINE FREEZING TO OCCUR.

                          A TEMPORARY HIGH FLYASH LOADING WAS THE RESULT OF AN ESP MALFUNCTION.

                          THE FGD SYSTEM IS STILL EXPERIENCING ROUTINE  START UP  PHASE  PROBLEMS.

11/78  SYSTEM                                                                 720

12/78  SYSTEM                                                                 74*

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         ALTHOUGH FGD THE SYSTEM HAS BEEN OPERATING,  WEATHER-RELATED PROBLEMS  HAVE
                         LIMITED OPERATIONS TO TWO MODULES.  REHEATER LEAKS OCCURRED DURING THE
                         PERIOD.

 1/79  SYSTEM                                                                 744

 2/79  SYSTEM                                                                 672

 3/79  SYSTEM                                                                 744

 4/79  SYSTEM                                                                 720

 5/79  SYSTEM                                     ,                            744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         HOURS ARE NOT YET AVAILABLE BECAUSE THE UTILITY IS CONCENTRATING EFFORTS
                         ON OPERATION OF THIS NEW UNIT.  THE UTILITY  REPORTED THAT THE SCRUBBING
                         MODULES THEMSELVES ARE OPERATING ACCEPTABLY.  ALSO THE  CHEMICAL PLANT IS
                         AVAILABLE AND THERE IS NO SYSTEM PLUGGING WHATSOEVER.

                         THE MAJOR PROBLEM ENCOUNTERED WAS  FAN VIBRATION.   THE UTILITY HAS BEEN
                         WORKING WITH THE SUPPLIER IN AN EFFORT TO DISCOVER WHY  FAN BALANCE HAS
                         BEEN DIFFICULT TO MAINTAIN.

 7/79  SYSTEM                                                                 744

 8/79  SYSTEM                                                                 744

 9/79  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE  THIRD QUARTER TWO OF THE FOUR ABSORBERS WERE DOWN  DUE TO
                         BOOSTER BLOWER VIBRATION PROBLEMS.

                                                                              744

                                                                              720

                                                       66.9
                                                       61.3
                                                         .0
                                                         .0
                                                       64.1                  744   622    477
10/79
11/79
12/79




SYSTEM
SYSTEM
E
F
G
H
SYSTEM


100.0
100.0
.0
.0
100.0


80.1
73.3
.0
.0
76.7
                                             13-948

-------
                                                  UTILITY FSD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PUBLIC SERVICE OF NEW MEXICO:  SAN JUAN 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  '/. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
       »* PROBLEMS/SOLUTIONS/COMMENTS
                         NOTE: SEE COMMENTS FOR 00/78 EXPLAINING SYSTEM DEPENDABILITY CALCULATIONS.

                         DURING DECEMBER TWO MODULES MERE DOWN COMPLETELY AS A RESULT OF REHEATER
                         PROBLEMS.
 1/80
E
F
G
H
SYSTEM
 92.0
100.0
   .0
   .0
 96.0
63.0
  .0
  .0
  .0
31.5
                                                       62.4
                                                         .0
                                                         .0
                                                         .0
                                                       31.2
                                                                      744   737
                                                                        232
       ** PROBLEMS/SOLUTIONS/COMMENTS
 2/80
 3/80
E
F
G
H
SYSTEM
E
F
G
H
SYSTEM
97.0
22.0
.0
.0
59.5
87.0
85.0
.0
.0
86.0
65.7
12.3
.0
.0
39.0
.0
93.6
.0
.0
46.8
                  THE F-MODULE MAS AVAILABLE, HOWEVER, FGD SERVICE WAS NOT REQUIRED BECAUSE
                  A BOILER-RELATED POWER FAILURE FORCED THE BOILER TO OPERATE AT LOW LOAD.

                                                64.5
                                                12.1
                                                  .0
                                                  .0
                                                38.3                  696   683    267

                                                  .0
                                                59.4
                                                  .0
                                                  .0
                                                29.7                  744   472    221  33.0
       »« PROBLEMS/SOLUTIONS/COMMENTS
  4/80
E
F
G
H
SYSTEM
99.3
99.9
.0
44.2
100.0
91.3
71.1
.0
58.5
90.8
                  DURING THE FIRST QUARTER ONLY ONE ABSORBER COULD BE OPERATED DUE TO AN
                  ELECTRICAL PROBLEM.  CURRENTLY, OPERATIONS ARE LIMITED TO TWO ABSORBERS
                  UNTIL NEW REHEATERS ARE INSTALLED.  REHEATER INSTALLATION IS EXPECTED TO
                  BE COMPLETED IN APRIL.

                                                68.5
                                                53.3
                                                  .0
                                                43.9
                                    98.8        68.1                  720   540    490  66.3
       ** PROBLEMS/SOLUTIONS/COMMENTS
 5/80
E
F
G
H
SYSTEM
99.1
98.9
.0
98.9
99.0
97.3
95.2
.0
91.9
94.8
                  MODULE G IS DOWN FOR MAJOR REPAIRS WHICH WERE A RESULT OF AN INTERNAL FIRE
                  EARLIER IN THE YEAR.

                  A REGULATION CHANGE EFFECTIVE APRIL 18, NOW REQUIRES THAT THREE MODULES
                  OPERATE TO MEET S02 REGULATIONS (SEE COMMENTS FOR 00/78).

                  MODULE H WAS UNAVAILABLE IN THE BEGINNING OF THE MONTH.

                                                86.7
                                                84.8
                                                  .0
                                                81.9
                                   100.0        84.5                  744   663    628  79.1
                                            13-949

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN Z (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER   BOILER  FGD    CAP.
                                                                SOZ   PART.  HOURS HOURS  HOURS FACTOR
 6/80
  7/80
  8/80
  9/80
 10/80
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE BOILER WAS DOWN FOR SEVERAL HOURS  FOR MINOR  MAINTENANCE AND BOILER  TUBE
                         REPAIRS.
E
F
G
H
SYSTEM
89.2
89.6
.0
88.8
89.2
72.4
74.1
.0
83.8
76.7
56.0
57.4
.0
64.9
98.3 59.4
                                                                              720   557
                                                                                           428  69.6
        «*  PROBLEMS/SOLUTIONS/COMMENTS
                          AN  ELECTRICAL CABLE  FAILURE  PREVENTED  MODULES  E  AND  F FROM OPERATING
                          SIMULTANEOUSLY.   AUXILIARY POWER COULD ONLY  BE PROVIDED TO ONE MODULE.
E
F
G
H
SYSTEM
97.6
96.9
.0
98.9
97.8
55.4
85.0
.0
91.0
77.1
49.1
75.3
.0
80.6
68.3
                                                                              744   659    508   79.8

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE  BOILER WAS DOWN  FOR  SEVERAL  DAYS  IN  JULY  TO REPAIR  STEAM TUBE LEAKS.

                          THE  POWER CABLE  WHICH  FAILED  IN  JUNE  WAS REPAIRED THIS  MONTH.  THIS CABLE
                          PERMITS  SIMULTANEOUS OPERATION OF  THE E  AND F MODULES WITH THE H MODULE.
E
F
G
H
SYSTEM
98.4
97.8
.0
98.3
98.2
90.2
72.7
.0
92.6
85.2 100.0
85.8
69.1
.0
88.0
81.0
                                                                              744   707
                                                                                           602   88.7
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          TUBE  LEAK  REPAIRS  IN  THE  BOILER  CAUSED  THE  FGD  SYSTEM NO TO OPERATE  FOR
                          TWO DAYS.
E
F
G
H
SYSTEM
99.0
99.3
.0
97.6
98.6
56.1
56.1
.0
56.2
56.1
51.9
51.9
.0
52.1
62.5 51.9
                                                                              720   667
                                                                                           374  85.5
        *# PROBLEMS/SOLUTIONS/COMMENTS
                          ESP PROBLEMS  CAUSED  ERRATIC  OPERATION OF  THE FGD SYSTEM FOR SEVERAL DAYS
                          IN SEPTEMBER.

                          THE FGD  SYSTEM WAS NOT OPERATED  DURING A  SCHEDULED OUTAGE OF THE CHEMICAL
                          PLANT.   THE SYSTEM WAS AVAILABLE DURING THIS TIME.

                          MODULE G WAS  UNAVAILABLE  IN  SEPTEMBER BECAUSE OF ONGOING REPAIR OF FIRE
                          DAMAGE.
E
F
G
H
SYSTEM
14.7
15.7
.0
1.1
10.5
36.2
39.0
.0
.0
25.0
14.7
15.7
.0
.0
27.0 10.1
                                                                              744   301
75  40.0
                                             13-950

-------
                                                  UTILITY F60 SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  '/. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
• ———•— —••«•—»— ••••••»_«•«•• «*»«_V_V«H »«»•«••• ••««»»»_•_ W~W*B« «_«« «W««K ______ _____ ______

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         UNIT 2 MAS OFF LINE FROM OCTOBER 4 TO OCTOBER 23 FOR A SCHEDULED FALL
                         OUTAGE.

                         THE "H" MODULE HAS UNAVAILABLE ESSENTIALLY THE ENTIRE MONTH AS A RESULT
                         OF MAINTENANCE BEING PERFORMED.

                         THE "G" MODULE REMAINED UNAVAILABLE DURING THE MONTH AS A RESULT OF THE
                         FIRE DAMAGE INCURRED ON MARCH 24.
11/80
 12/80
  1/81
E
F
G
H
SYSTEM
97.6
90.0
  .0
57.2
81.8
65.8
73.3
  .0
20.7
59.5
                                           60.4
                                                       55.3
                                                       47.2
                                                         .0
                                                       13.3
                                                       38.3
                                                                             720   464
                                                                                          276  57.0
       •* PROBLEMS/SOLUTIONS/COMMENTS
E
F
G
H
SYSTEM
95.3
95.6
.0
69.4
85.8
42.4
59.9
.0
51.7
51.6
                  UNIT 2 WAS DOWN FROM NOVEMBER 13 TO 18 TO REPAIR A WATERWALL TUBE LEAK AND
                  FROM NOVEMBER 19 TO 23 AS A RESULT OF THE FAILURE OF A START-UP
                  TRANSFORMER.

                  THE "H" MODULE WAS OUT OF SERVICE FROM NOVEMBER 1 TO 12 TO BALANCE THE
                  ROTOR IN THE BOOSTER BLOWER AND TO REPAIR THE ABSORBER RECIRCULATING
                  PUMP.

                                                34.3
                                                48.4
                                                  .0
                                                41.8
                                   100.0        41.7                  744   601    310  73.9
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE UNIT WAS DOWN FROM DECEMBER 6 TO 7 TO REPAIR A TUBE LEAK, BUT THEN RE-
                         MAINED DOWN UNTIL DECEMBER 11 FOR A TRANSFORMER TIE-IN.

                         THE "H" MODULE WAS DOWN FROM DECEMBER 11 TO 19 TO REPAIR A LEAK THAT HAD
                         DEVELOPED AT THE SUCTION SIDE OF THE ABSORBER RECIRCULATING PUMP.

                         THE UNIT 2 FGD SYSTEM EXPERIENCED A LOSS OF POWER ON DECEMBER 24 AND DID
                         NOT RETURN TO SERVICE UNTIL DECEMBER 26 AS A RESULT OF COMPUTER
                         PROBLEMS THAT DEVELOPED.

                         THE "G" MODULE REMAINED OUT OF SERVICE THROUGH THE END OF THE FOURTH
                         QUARTER AS A RESULT OF THE FIRE DAMAGE INCURRED IN MARCH.
       E
       F
       G
       H
       SYSTEM
            98.5
            97.7
              .0
            97.6
            97.0
            84.1
            79.2
              .0
            89.8
            76.0
            98.0
                        84.1
                        79.2
                          .0
                        89.8
                        76.0
744   744
563  98.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         DURING JANUARY MODULE F WAS OUT OF SERVICE APPROXIMATELY 17 HOURS DUE TO
                         BOILER LOAD CURTAILMENT.

                         THE FGD SYSTEM OPERATED ERRATICALLY DURING JANUARY DUE TO  PRECIPITATOR
                         PROBLEMS AND HIGH SOLIDS IN THE SCRUBBER SUMPS.

                         MODULE G REMAINED OUT OF SERVICE DUE TO REPAIRS ON THE INTERNALS DAMAGED
                                             13-951

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PUBLIC SERVICE OF NEW MEXICO'- SAN JUAN 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL    PER   BOILER   FGD   CAP.
                                                                502   PART.  HOURS HOURS  HOURS  FACTOR

                         BY A FIRE ON MARCH 24, 1980.
 2/81
  3/81
  4/81
  5/81
       E
       F   „
       G
       H
       SYSTEM
96.6
99.1
  .0
93.0
96.0
43.2
54.0
  .0
69.7
31.0
99.0
34.4
43.0
  .0
55.5
25.0
                                  672   535
166  68.0
       «* PROBLEMS/SOLUTIONS/COMMENTS
                         DURING FEBRUARY MODULE E WAS OUT OF SERVICE APPROXIMATELY  72  HOURS DUE TO
                         LACK OF DEMAND.  THE TOTAL SYSTEM OPERATED INTERMITTENTLY  FROM MARCH 2
                         THROUGH MARCH 10, 1981 DUE TO PRECIPITATOR REPAIRS.

                         THE BOILER WAS OUT OF SERVICE APPROXIMATELY 48  HOURS  TO REPAIR A  WATER-
                         WALL TUBE  LEAK AND APPROXIMATELY 96 HOURS TO  REPAIR AN ECONOMIZER TUBE
                         LEAK.
E
F
G
H
SYSTEM
98.1
95.4
.0
94.5
94.0
81.2
79.8
.0
86.2
82.0
63.2
62.1
.0
67.1
94.0 64.0
                                                                              744   579
                                                                       476  69.0
        »*  PROBLEMS/SOLUTIONS/COMMENTS
                         DURING  MARCH THE BOILER WAS OUT OF SERVICE  APPROXIMATELY 165 HOURS  DUE TO
                         A  SCHEDULED MAINTENANCE OUTAGE.

                         MODULE  E  WAS OUT OF  SERVICE APPROXIMATELY 72  HOURS  AND  MODULE F  FOR APPROX-
                         IMATELY 48 HOURS DUE TO LOW STACK GAS TEMPERATURE.
E
F
G
H
SYSTEM
40.3
97.8
.0
96.9
78.0
6.9
88.2
.0
90.8
62.0 66.0
5.3
67.6
.0
69.6
47.0
                                                                              720    552
                                                                                           340   70.0
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          DURING  APRIL  THE  BOILER WAS OUT OF  SERVICE  APPROXIMATELY 168 HOURS  DUE TO
                          A SCHEDULED OUTAGE.

                          MODULE  E  WAS  OUT  OF  SERVICE UNTIL APRIL 20, DUE  TO HIGH BOOSTER BLOWER
                          VIBRATIONS AND  TO CLEAR PLUGGED TRAY  RECIRCUUTION PUMP LINES AND VALVES.
E
F
G
H
SYSTEM
95.4
98.2
4.3
95.7
97.8
86.8
81.1
5.6
77.2
83.5
66.5
62.1
4.3
59.1
95.8 64.0
                                                                              744   570
                                                                       476  71.0
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          DURING  MAY  THE  BOILER  WAS  OUT  OF  SERVICE  APPROXIMATELY 144 HOURS TO REMOVE
                          CLINKERS  FROM THE  BOTTOM ASH AREA IN  THE  BOILER.

                          ADDITIONAL  BOILER  OUTAGE TIME  WAS NEEDED  TO REPAIR  A BROKEN OIL LINE AT
                          THE  TURBINE.

                          ADDITIONAL  OUTAGE  TIME WAS DUE TO THE BOTTOM COLLECTOR TRAY LEAKING AT ALL
                          FOUR WALLS.
 6/81   E
                    62.4
                                49.7
                                                        49.7
                                             13-953

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PUBLIC SERVICE OF NEW MEXICO:  SAN JUAN 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                              •/. REMOVAL   PER   BOILER   FGD    CAP.
                                              S02  PART.  HOURS HOURS  HOURS FACTOR
F
G
H
SYSTEM
60.8
27. 4
42.1
62.5
45.4
18.8
12.5
41.8


47.4
45.4
18.8
12.5
41.8


720


720


301


91.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         ALL THE ABSORBER MODULES WERE DOWN DURING PART OF THE MONTH FOR AN INSTRU-
                         MENT TIE-IN AT THE FLYASH FILTERS, TO MAKE ELECTRICAL CONNECTIONS TO NEW
                         BUS BARS AND BECAUSE OF MULTIPLEXER PROBLEMS.

                         MODULE H WAS UNAVAILABLE PART OF JUNE DUE TO INLET DAMPER PROBLEMS.

                         MODULE G NEEDED INTERNAL REPAIRS DURING THE MONTH.
 7/81
       E
       F
       G
       H
       SYSTEM
 99.1
 98.9
 51.5
 59.9
 93.0
70.7
87.5
30.5
19.1
80.0
                                           86.0
             70.7
             87.5
             30.5
             19.1
             80.0
                                                                             744   744
                                                                        594   74.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         MODULE H WAS DOWN FOR THE FIRST THIRTEEN DAYS OF THE MONTH FOR REPAIRS TO
                         THE INLET ISOLATION DAMPER.

                         OPERATION OF THE FGD SYSTEM WAS LIMITED TO TWO ABSORBERS DURING THE
                         LATTER HALF OF THE MONTH DUE TO A LACK OF STACK REHEAT.
 8/81
       E
       F
       G
       H
       SYSTEM
100.0
100.0
 10.8
100.0
100.0
52.5
61.3
13.3
  .0
54.0
100.0
42.5
49.6
10.8
  .0
43.0
                                   744   602
                                                323   85.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         OUTAGE TIME DURING THE MONTH FOR THE E AND F MODULES WAS ATTRIBUTED TO
                         PROBLEMS WITH THE ELECTROSTATIC PRECIPITATORS. AS A RESULT, THE UNIT WAS
                         DOWN FROM AUGUST 14 TO AUGUST 28 FOR PRECIPITATOR REPAIRS.

                         THE H MODULE WAS ON STANDBY THE ENTIRE MONTH SINCE ONLY TWO MODULES CAN BE
                         OPERATED WITHOUT STACK GAS REHEAT.

                         THE G MODULE WAS DOWN MOST OF THE MONTH AS A RESULT OF MIST ELIMINATOR
                         PAD DAMAGE AND HIGH SOLUTION LOSSES INTO THE SUMP.
  9/81
       E
       F
       G
       H
       SYSTEM
 11.9
 25.4
 75.0
 93.9
 69.0
 5.5
17.9
10.4
23.4
19.0
 19.0
 5.4
17.6
10.3
23.1
19.0
720   710
137  86.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         ALL FGD SYSTEM MODULES WERE DOWN FROM SEPTEMBER 11 TO SEPTEMBER 30 AS A
                         RESULT OF A SCHEDULED CHEMICAL PLANT OUTAGE.

                         THE G MODULE RESTARTED ON SEPTEMBER 8 AFTER COMPLETION OF MIST ELIMINATOR
                         AND TRAY REPAIRS.

                         THE LACK OF STACK REHEAT KEPT MODULE F OFF-LINE THE MAJORITY OF THE MONTH.

                         THE H MODULE WAS DOWN FOR TWO DAYS DURING THE MONTH BECAUSE OF HIGH
                                            13-953

-------
UTILITY FGD SURVEY •' OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL    PER   BOILER   FGD   CAP.
                                                                S02   PART.  HOURS HOURS  HOURS FACTOR
10/81
 11/81
 12/81
  1/82
                         VIBRATION ON THE BOOSTER FAN.
E             .0          .0
F            6.4          .0
G           95.2        93.4
H           95.2        92.8
SYSTEM      64.9        62.1

** PROBLEMS/SOLUTIONS/COMMENTS
                                           66.5
  .0
  .0
68.1
67.7
45.3
                                                                              744   543
337  65.0
                         DURING OCTOBER THE BOTTOM  PADS IN THE MIST  ELIMINATOR  OF  MODULE  F  WERE
                         REPLACED CAUSING THE MODULE TO REMAIN OFF-LINE  UNTIL OCTOBER  30.   THE
                         SYSTEM WAS PRIMARILY DOWN  BECAUSE OF PROBLEMS WITH  THE STACK  REHEAT.
E
F
G
H
SYSTEM
.0
98.6
93.6
81.2
93.0
.0
80.6
79.2
59.1
71.0
.0
66.2
65.1
48.6
90.0 59.0
                                                                              720    592     422  72.0

        **  PROBLEMS/SOLUTIONS/COMMENTS

                          DURING NOVEMBER THE UNIT DOWN TIME WAS  CAUSED  BY  ESP PROBLEMS.

                          MODULE E WAS OFF-LINE DURING THE MONTH  TO REPLACE THE BOTTOM MIST ELIMINA-
                          TOR  AND THE BALLAST TRAY.

                          OUTAGE TIME FOR MODULE  G WAS DUE TO  A LACK  OF  STACK REHEAT.
E
F
G
H
SYSTEM
87.2
98.9
98.9
25.7
95.0
51.3
80.5
92.2
10.7
88.8
51.3
80.5
92.2
10.7
94.5 88.8
                                                                              744   744
                                                                                           661  71.0
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          MODULE  E  WAS RESTARTED  ON  DECEMBER  4 AFTER  THE  PROLONGED OUTAGE TO REPAIR
                          THE  MIST  ELIMINATOR  PADS AND  THE  BOTTOM BALLAST TRAY.

                          ABSORBER  OPERATIONS  DURING THE  MONTH WERE CURTAILED DUE TO ESP PROBLEMS,
                          HIGH OPACITY IN  THE  STACK  AND HIGH  SOLIDS IN THE SUMPS.

                          MODULE  H  WAS OFF-LINE MOST OF THE MONTH DUE TO  A BURNED OUT BOOSTER BLOWER
                          MOTOR.

                          TWO  MODULES WERE TAKEN  OFF-LINE APPROXIMATELY NINE DAYS DUE TO A LACK OF
                          STACK REHEAT.
E
F
G
H
SYSTEM
95.0
97.6
98.2
63.2
99.0
63.3
66.1
63.1
51.7
65.0
61.1
63.8
61.0
50.0
97.0 82.0
                                                                              744   719
                                                                                           611  79.0
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          DURING JANUARY ALL MODULES WERE OFF-LINE FOR THREE DAYS DUE TO ESP
                          PROBLEMS.

                          MODULE H WAS SHUT DOWN PART OF THE MONTH BECAUSE OF LOW OIL TEMPERATURE
                          AND HIGH VIBRATION ON THE BOOSTER BLOWER.

                          THE UNIT WAS OFF-LINE AT THE END OF THE MONTH TO REPAIR THE PRIMARY AIR
                                             13-954

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PUBLIC SERVICE OF NEW MEXICO:  SAN JUAN 2 (CONT.)
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION 7. REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR

2/82 E
F
G
H
SYSTEM

100.0
100.0
100.0
.0
100.0
DAMPER ON THE COAL MILL.
75.0
75.0
75.0
.0
75.0 100.0

.9
.9
.9
.0
1.0





672 8 6 1.0
       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS SHUT DOWN ON FEBRUARY 1 FOR EXTENSIVE TRUBINE REPAIRS.

                         MODULE H WAS DOWN THE ENTIRE MONTH FOR INLET DAMPER REPAIRS.

 3/82  E          100.0                                  .0
       F          100.0                                  .0
       G          100.0                                  .0
       H             .0                                  .0
       SYSTEM     100.0                                  .0                  744     0      0    .0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN THE ENTIRE MONTH OF MARCH FOR AN OVERHAUL AND TURBINE
                         REPAIRS.

                         MODULE H WAS OUT OF SERVICE FOR REPAIR OF THE INLET DAMPERS AND THE
                         ABSORBER WALLS.

 4/82  E          100.0                                  .0
       F          100.0                                  .0
       6          100.0                                  .0
       H             .0                                  .0
       SYSTEM     100.0                                  .0                  720     0      0    .0

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL THE UNIT WAS DOWN FOR TURBINE REPAIRS AND AN OVERHAUL.   THE
                         FGD SYSTEM WAS AVAILABLE DURING THE ENTIRE MONTH.

 5/82  E          100.0                                  .0
       F          100.0                                  .0
       G          100.0                                  .0
       H             .0                                  .0
       SYSTEM     100.0                                  .0                  744     0      0    .0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MAY THE UNIT WAS DOWN FOR AN OVERHAUL AND TURBINE REPAIR WORK.

                         MODULE H WAS UNAVAILABLE DURING APRIL AND MAY WHILE THE INLET DAMPERS
                         WERE BEING REPLACED AND THE ABSORBER WALLS WERE BEING REPAIRED.

 6/82  E           45.8        14.4                    10.6
       F           46.0        18.1                    13.3
       G           44.9        21.2                    15.6
       H
       SYSTEM      45.6        17.9                    13.1                  720   529     95  57.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN FROM JUNE 1 TO JUNE 8 FOR TURBINE REPAIR  AND OVERHAUL.

                         ALL ABSORBERS WERE OUT OF SERVICE FROM JUNE 9 TO JUNE 25 DUE TO COMPUTER
                         PROBLEMS.
                                            13-955

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 2 (CONT.)
	___	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  V. REMOVAL    PER   BOILER   FGD   CAP.
                                                                S02   PART. HOURS  HOURS   HOURS  FACTOR


7/82 E
F
G
H
SYSTEM


69.1
92.9
51.7

71.2
MODULE H WAS UNAVAILABLE
ABSORBER CELL WALLS.
43.0
80.8
71.2

65.0
FROM JUNE 1 TO JUNE 30 DUE TO REPAIR OF THE

30.1
56.6
49.9

45.5 744 521 339






61.0
  8/82
  9/82
 10/82
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         MODULE G WAS DOWN FROM JULY 14 TO JULY 28 FOR REPAIRS ON A  SCRUBBER
                         RECIRCULATION PUMP.

                         THE UNIT WAS DOWN FROM JULY 16 TO JULY 25 TO REPAIR A BOILER TUBE  LEAK.

                         MODULE E WAS DOWN FROM JULY 1 TO JULY 6 FOR MAINTENANCE ON  A BOOSTER FAN
                         LUBE OIL SYSTEM.

                         MODULE H WAS DOWN FROM JULY 1 TO JULY 31 FOR ABSORBER CELL  WALL  REPAIRS.

                         A TURBINE BALANCING ALSO CONTRIBUTED TO THE UNIT DOWN TIME  FROM  JULY 16 TO
                         JULY 25.
E
F
G
H
SYSTEM
                    88.7
                    98.1
                    96.6
                     5.6
                    96.4
70.2
89.0
86.4
 5.8
83.8
68.7
87.1
84.5
 5.6
82.0
                                                                              744    728
                                                                                   610  64.0
        »*  PROBLEMS/SOLUTIONS/COMMENTS
                  THE ABSORBER OPERATION WAS RESTRICTED TO TWO MODULES AT VARIOUS TIMES
                  DURING AUGUST DUE TO A LACK OF STACK REHEAT.

                  MODULE E WAS DOWN FROM AUGUST 16 TO AUGUST 18 TO REPAIR A BOOSTER FAN LUBE
                  OIL SYSTEM.

                  MODULE H WAS DOWN FROM AUGUST 1 TO AUGUST 14 PARTLY FOR REPAIRS TO THE
                  ABSORBER CELL WALLS.

                  A BOOSTER FAN ROTOR BALANCE ALSO CONTRIBUTED TO THE DOWN TIME DURING AUGUST
                  FOR MODULE H.

                  MODULE H WAS DOWN FROM AUGUST 16 TO AUGUST 31 FOR REPAIRS ON A BOOSTER FAN
                  MOTOR.

                                                48.8
                                                48.1
                                                45.4

                                                47.4                  720   399    341

** PROBLEMS/SOLUTIONS/COMMENTS

                  MODULE H WAS DOWN DURING SEPTEMBER TO REPAIR A BOOSTER FAN MOTOR.

                  THE UNIT WAS DOWN DURING PART OF SEPTEMBER DUE TO A CHEMICAL PLANT OUTAGE.

                                                32.8
                                                11.6
                                                46.2
E
F
G
H
SYSTEM
56.7
56.7
56.5

56.6
88.0
86.7
82.0

85.5
E
F
G
H
SYSTEM
47.0
16.7
47.4

37.1
33.5
11.8
47.2

30.8
                                                        30.2
                                                                              744   729
                                                                                   225  89.0
                                             13-956

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABIHTY RELIABILITY UTILIZATION  Y. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM RESUMED OPERATION ON OCTOBER 16 FOLLOWING A CHEMICAL PLANT
                         OUTAGE.

11/82  E           80.1        79.3                    79.3
       F           98.2        96.*                    96.4
       G           98.2        90.6                    90.6
       H
       SYSTEM      92.2        88.8                    88.8                  720   720    639  96.0

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE E WAS DOWN FROM NOVEMBER 25 TO NOVEMBER 30 TO REPAIR LEAKS ON A
                         BOTTOM COLLECTOR TRAY.

                         MODULE H WAS DOWN FOR THE ENTIRE MONTH TO REPAIR A BOOSTER FAN MOTOR.

12/82  E           73.9        59.0        '            57.5
       F           91.3        75.2                    73.4
       G           96.4        89.9                    87.8
       H
       SYSTEM      87.2        74.7                    72.9                  744   726    542  81.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A UNIT TRIP OCCURRED BETWEEN DECEMBER 17 AND 18.

                         MODULE E WAS DOWN FROM DECEMBER 1 TO DECEMBER 5 AND AGAIN FROM DECEMBER 29
                         TO DECEMBER 31 TO REPAIR LEAKS ON A BOTTOM COLLECTOR TRAY.

                         MODULE F WAS DOW FROM DECEMBER 26 TO DECEMBER 28 TO REPAIR A SCRUBBER
                         RECIRCULATING PUMP.

                         MODULE H WAS DOWN DURING THE ENTIRE MONTH TO REPAIR A BOOSTER FAN MOTOR.

                         ONLY TWO MODULES OPERATED DURING PART OF THE PERIOD DUE TO A LACK OF STACK
                         REHEAT.

                                                       29.6
                                                       62.6
                                                       74.7

                                                       55.6                  744   658    414  78.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN FROM JANUARY 24 TO JANUARY 28 TO REPAIR AN ECONOMIZER
                         TUBE LEAK.

                         THE UNIT WAS DOWN ON JANUARY 28 TO CLOSE A DOOR ON THE 2A PRECIPITATOR.

  2/83  E
       F           68.0        67.7                    60.0
       G           94.9       100.0                    89.0
       H
       SYSTEM      81.5        83.9                    74.5                  672   595    501  61.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN ON FEBRUARY 8 AND FROM FEBRUARY 15 TO  FEBRUARY 18  DUE TO
                         BOILER-RELATED PROBLEMS.
                                            13-957
1/83 E
F
G
H
SYSTEM
45.4
78.8
90.6

71.6
33.4
70.8
84.5

62.9

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 2 (CONT. )
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  V. REMOVAL   PER  BOILER   FGD   CAP.
                                                                SOS  PART. HOURS HOURS  HOURS FACTOR

                         MODULES E AND F WERE DOWN FROM FEBRUARY 15 TO FEBRUARY 18 TO SEAL THE
                         ABSORBER TRAYS.

                         BOOSTER FAN PROBLEMS ALSO CONTRIBUTED TO THE OUTAGE FOR MODULE F DURING
                         FEBRUARY.

                         MODULE H WAS DOWN FROM FEBRUARY 15 TO FEBRUARY 18 TO REPAIR A BOOSTER FAN
                         MOTOR.

 3/83  E           39.0        39.0                    39.0
       F           97.0        96.0                    96.0
       G           98.0        98.0                    98.0
       H
       SYSTEM      78.0        77.6                    77.6                  744   744    578  71.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         MODULES E AND H WERE DOWN DURING MARCH TO REPAIR THE BOOSTER FAN MOTORS.

 4/83  E           93.1        100.0                    93.1
       F           96.0        100.0                    96.0
       G           98.1        100.0                    98.1
       H              .0          .0                      .0
       SYSTEM      95.7        100.0                    95.7                  720   578    689  62.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN DURING PART OF APRIL FOR A SPRING OUTAGE.

                         THE MODULE H BOOSTER FAN WAS OUT OF SERVICE DURING PART OF THE MONTH TO
                         REPAIR A MOTOR.

 5/83
E
F
G
H
SYSTEM
30.0
98.9
98.9
.0
75.9
45.5
100.0
100.0
.0
81.8
30.0
89.0
89.7
.0
69.5
                                                                              744    490     517  50.0

        **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE UNIT WAS DOWN  FROM MAY 1 TO MAY 11 FOR A SCHEDULED OUTAGE.

                          A  UNIT  TRIP OCCURRED ON MAY 11 DUE TO PROBLEMS  WITH  AN AUXILIARY POWER
                          SUPPLY.

                          A  UNIT  TRIP OCCURRED ON MAY 23 DUE TO BOILER FEED  PUMP CONTROL  PROBLEMS.

                          MODULE  E WAS DOWN  DURING  PART OF MAY TO REPAIR  ABSORBER  TRAY LEAKS.

                          MODULE  H WAS DOWN  DURING  THE MONTH TO REPAIR A  BOOSTER FAN MOTOR.

  6/83
E
F
G
H
SYSTEM
90.0
96.9
95.0
5.0
95.6
86.0
96.0
93.1
5.0
93.3
86.0
96.0
93.1
5.0
93.3
                                                                              720    720     672  78.0

        **  PROBLEMS/SOLUTIONS/COMMENTS

                          MODULES  E  AND  H  WERE  DOWN DURING  PART OF  JUNE  TO INSTALL SUMP  LEVEL
                          DETECTORS.

                          THE  UTILITY REPORTED  THAT NO  MAJOR  OUTAGES  OCCURRED  DURING JUNE.
                                             13-958

-------
                                                  UTILITY FSD SURVEY:  OCTOBER 1983 - SEPTEMBER 1984
PUBLIC SERVICE OF NEW MEXICO:  SAN JUAN 2 (CONT.)
PERIOD
7/83
8/83
9/83
10/83
11/83
MODULE
AVAILABILITY OPERABILITY
RELIABILITY
UTILIZATION
E 41.0 41.0 41
F 98.0 98.0 98
G 34.0 34.0 34
H 98.9 97.0 97
SYSTEM 90.6 90.0 90
*» PROBLEMS/SOLUTIONS/COMMENTS
MODULE E MAS DOWN DURING PART OF
MODULE E MAS DOWN DURING PART OF
MODULE G MAS OOMN DURING PART OF
E 41.0 40.1 40
F 97.0 91.9 91
G 23.0 26.9 26
H 84.0 78.0 78
SYSTEM 83.3 78.9 78
** PROBLEMS/SOLUTIONS/COMMENTS
MODULE E MAS DOWN DURING PART OF
MODULES G AND H MERE DOWN DURING
FAN MOTOR.
E .0 .0 .0
F 98.1 90.9 100.0 64
G 99.0 89.9 78.1 63
H 99.0 93.9 100.0 66
SYSTEM 98.7 91.6 92.7 64
** PROBLEMS/SOLUTIONS/COMMENTS
THE UNIT HAS DOMN FROM SEPTEMBER
DUE TO REHEATER TUBE LEAKS.
MODULE E MAS DOMN DURING PART OF
E .0 .0
F 98.0 93.0 93.0 93
G 98.9 4.0 4.0 4
H 77.0 73.9 73.9 73
SYSTEM 91.3 57.0 57.0 57
** PROBLEMS/SOLUTIONS/COMMENTS
MODULE E MAS DOMN DURING OCTOBER
E .0 .0
F 95.0 93.0 93.0 73
G 96.9 87.0 87.0 66
H 96.9 82.0 82.0 64
SYSTEM 96.3 87.3 87.3 68
X REMOVAL PER
S02 PART. HOURS
BOILER FGD CAP.
HOURS HOURS FACTOR
.0
.0
.0
.0
.0 744 744 670 87.0
JULY FOR ABSORBER TRAY REPAIRS.
THE MONTH TO BALANCE A BOOSTER FAN.
JULY TO REMIND THE BOOSTER FAN MOTOR.
.1
.9
.9
.0
.9 744 744 587 87.0
AUGUST TO REPLACE ABSORBER TRAY CAPS.
PART OF THE MONTH TO REWIND THE BOOSTER
.0
.0
.3
.1
.5 720 507 464 58.0
14 TO 18 AND AGAIN FROM SEPTEMBER 19 TO 24
SEPTEMBER DUE TO DISTORTED ABSORBER TRAYS.
.0
.0
.0
.9
.0 744 744 424 84.0
DUE TO BRICK MALL LINER FAILURE.
.0
.3
.6
.7
.9 720 568 496 66.0
       #* PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING NOVEMBER 1983.
 12/83  E
                     .0
.0
                                                         .0
                                            13-959

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 2 (CONT.)
._	.	.—PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
 2/84
  3/84
  4/84
  5/84
 6/84
7. REMOVAL   PER  BOILER  FGD   CAP.
S02  PART. HOURS HOURS  HOURS FACTOR
F
G
H
SYSTEM
98.
98.
98.
98.
9
9
9
9
84.0
86.0
80.1
83.3
84.
86.
80.
83.
0
0
1
3
83.
85.
79.
83.
7
8
8
1


744


742


618


83.0
       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE E WAS DOWN DURING DECEMBER FOR ABSORBER TRAY  REPAIRS.
                                                                              744    743
1/84




E
F
G
H
SYSTEM
51.9
89.8
98.8
97.7
100.0
14.0
57.9
84.9
82.9
79.9
18.8
100.0
100.0
100.0
100.0
14.0
57.8
84.8
82.8
79.8
                          594  83.5
       »* PROBLEMS/SOLUTIONS/COMMENTS
                         MODULE E WAS DOWN DURING JANUARY AND FEBRUARY TO REPAIR  A BENT  ABSORBER
                         TRAY.
E
F
G
H
SYSTEM
90.9
90.9
72.6
72.6
100.0
26.0
90.9
62.0
69.0
82.6
47.4
100.0
97.8
75.9
100.0
23.9
83.5
56.9
63.4
75.9
                                                                             696   639
                          528  82.7
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         A LACK OF REHEAT RESTRICTED FGD SYSTEM OPERATION AT MODULE  E DURING THE
                         MONTH.
                                                                                           160  25.5
E
F
G
H
SYSTEM
28.6
28.6
23.6
13.4
33.1
86.7
93.8
45.0
.0
75.2
100.0
100.0
100.0
.0
100.0
24.9
26.9
12.9
.0
21.6 744 213
** PROBLEMS/SOLUTIONS/COMMENTS

E
F
G
H
SYSTEM

86.9
83.9
90.8
90.8
100.0
A LACK OF REHEAT
71.0
15.0
83.0
76.9
82.0
RESTRICTED
100.0
100.0
100.0
100.0
100.0
FGD SYSTEM OPERATIONS DURING MARCH.
70.1
14.9
81.9
76.0
81.0 720 711
** PROBLEMS/SOLUTIONS/COMMENTS
MODULE F WAS DOWN DURING APRIL FOR ABSORBER TRAY SEAL REPAIRS.
E
F
G
H
SYSTEM
E
F
G
H
SYSTEM
.0
91.9
95.0
95.0
94.0
31.5
68.5
36.9
68.5
68.5
.0
88.0
91.9
66.0
88.7
6.0
45.0
33.0
36.0
40.0

88.0
91.9
86.0
68.7
9.5
51.7
52.2
41.4
51.6
.0
88.0
91.9
66.0
88.7 744 744
4.7
35.4
26.0
28.3
31.5 720 567
                                                                                           583  87.7
                                                                                           660  94.3
                                                                                           227  71.0
                                             13-960

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

PUBLIC SERVICE OF NEW MEXICO:  SAN JUAN Z (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                SOZ  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE E MAS DOWN DURING MAY AND JUNE FOR ABSORBER TRAY REPAIRS.

                         NEW BEAMS MERE INSTALLED AT MODULE E DURING THE MONTH.

                         ABSORBER TRAY SEALS MERE REPAIRED ON MODULE G DURING JUNE.

 7/8*  SYSTEM                                                                7**

 8/8*  SYSTEM                                                                7**

 9/8*  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION HAS UNAVAILABLE FOR THE THIRD QUARTER OF 198*.
                                             13-961

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - V.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** PARTICLE SCRUBBER
     NUMBER
     NUMBER OF SPARES
     INITIAL START-UP DATE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - LITER/CU.M
     PRESSURE DROP - KPA
     SUPERFICIAL GAS VELOCITY - M/S
     INLET GAS FLOW RATE - CU.M/S
     INLET GAS TEMPERATURE - C
     PARTICLE REMOVAL EFFICIENCY - 7.

*** FGO SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
PUBLIC SERVICE OF NEW MEXICO
SAN JUAN
WATERFLOW
NEW MEXICO
A
    9.
  146.
**«#**
 1560
  534
  468
  487
  534
               (  .020 LB/MMBTU)
               (  .340 LB/MMBTU)
               (*»«*«* LB/MMBTU)
BABCOCK t WILCOX
PULVERIZED COAL
BASE
               (2040800 ACFM)
               ( 249 F)
               ( 400 FT)

               ( 28.0 FT)
               (   9000 BTU/LB)
                8000-11628
  963.05
  120.6
  122.
CONCRETE
    8.5
COAL
SUBBITUMINOUS
20934.

   22.00
12.6-22.5
   10.50
8.1-15.0
     .80
0.6-1.3
     .03
0.00-0.09
 4
 1
 1/82
VENTURI TOWER
VARIABLE-THROAT/BOTTOM-ENTRY PLUMB BOB
N/A
DAVY MCKEE
14.5 DIA X 32.6
CARBON STEEL
AISI 1110
INORGANIC
PREFIRED BRICK/SHAPES
STAINLESS STEEL
 1
  315.0
    1.0
    3.1
    3.3
  316.6
  133.3
   75.0
                 5000 GPM)
                 7.5 GAL/1000ACF)
                12.5 IN-H20)
                   10.8 FT/S)
                 671000 ACFM)
                  272 F)
SALEABLE PRODUCT
WET SCRUBBING
                                             13-962

-------
                                                  UTILITY F60 SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 3 (CONT.)

     PROCESS TYPE                               WELLMAN LORD
     PROCESS ADDITIVES                          NONE
     SYSTEM SUPPLIER                            DAVY MCKEE
     A-E FIRM                                   DAVY MCKEE
     DEVELOPMENT LEVEL                          FULL SCALE
     NEW/RETROFIT                               NEW
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY - 7.   99.50
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X        90.00
     ENERGY CONSUMPTION - X                         3.6
     CURRENT STATUS                              1
     COMMERCIAL START-UP                        13/79
     INITIAL START-UP                           12/79
     CONTRACT AWARDED                            8/78
 «* DESIGN AND OPERATING PARAMETERS

 »* QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 »* ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSICMS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - 7.

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH FREQUENCY
     WASH RATE - L/S

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     INLET FLUE GAS FLOW RATE - CU. M/S
     INLET FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     NUI13ER OF SPARES
     DESIGN
     SUPPLIER
NR
NR
 4
 1
TRAY TOWER
VALVE TRAY
BUBBLE CAP TRAY TOWER
DAVY MCKEE
30.0 X 33.5 X 78.0
INORGANIC
HYDRAULICALLY-BONDED CONCRETE
PORTLAND CEMENT
STAINLESS STEEL
AUSTENITIC
TYPE 316L
VALVE TRAY
 5
   35.
     .1
    3.3
  240.67
   48.9
   90.0
(   550 GPM)
(   1.1 GAL/1000 ACF)
(17.0 IN-H20)
(  10.8 FT/S)
(  510000 ACFM)
(   120 F)
PRIMARY COLLECTOR
 2
IMPINGEMENT
BAFFLE
CLOSED VANE
HORIZONTAL
NR
NR
BLENDED
CONTINUOUS ON ONE
   10.4        (
   t INTERMITTENT ON THE OTHER
   165 GAL/MIN)
INDIRECT HOT AIR
EXTERNAL HEAT EXCHANGER
STEAM TUBE BUNDLE
  866.41       (1836000 ACFM)
   52.8        (  127 F)
NR
NR
 4
 1
CENTRIFUGAL
BUFFALO FORGE
                                             13-963

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 3 (CONT.)

     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      L-INER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 «* REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 «* TANKS
     SERVICE
     ABSORBER RECYCLE

 ** PUMPS
     SERVICE
     SCRUBBER RECIRCULATION

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE

*** SALEABLE BYPRODUCTS
     NATURE
     FULL LOAD QUANTITY - M T/H
     DISPOSITION

*** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     SITE TREATMENT
BOOSTER
FORCED DRAFT
DRY
  328.25
  120.6
CARBON STEEL
                                                 2
                                                 0
                                                CENTRIFUGAL
                                                WESTINGHOUSE
                                                UNIT
                                                FORCED DRAFT
                                                DRY
                                                CARBON STEEL
                                                NR
                                                NR
                                                NR
                                                NR
                                                NR
                                                NR
                                                NR
                                                NR
                                                NR
                                                NR
                                                NR
                                                MIX TANK
                                                N/A
                                                AGITATED TANK
                                                               (  695600 ACFM)
                                                               (   249 F)
NUMBER

   1


NUMBER

   1


NONE
SULFURIC ACID
   19.05       ( 21.00 TPH)
MARKETED
N/A
N/A
N/A
N/A
NONE
N/A
                                            13-964

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER
PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 3 (CONT.)
 «* PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     CONTROL LEVELS
     MONITOR LOCATION
     PROCESS CONTROL MANNER

 ** WATER BALANCE
     MATER LOOP TYPE

 «* F6D SPARE CAPACITY INDICES
     ABSORBER - 7.

 ** F6D SPARE COMPONENT INDICES
     ABSORBER
                                         PH & DENSITY
                                         PH 5.5-6.5;  SP.6R.  1.2-1.3
                                         ABSORBER BLEED t PRODUCT SOLUTION
                                         MANUAL
                                         CLOSED
                                            33.3
                                                    1.0
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                                         •/. REMOVAL
                                                         S02  PART.
                                                         PER  BOILER
                                                        HOURS HOURS
                                                          FGD   CAP.
                                                         HOURS  FACTOR
12/79  M
       SYSTEM
           100.0
           100.0
            11.2
            11.2
                         5.9
                         5.9
                                                                             744   392
                                                                                           44
          PROBLEMS/SOLUTIONS/COMMENTS
                         THE SAN JUAN 3 BOILER AND FGD SYSTEM BEGAN OPERATIONS IN DECEMBER 1979.
                         CURRENTLY ONLY ONE MODULE IS OPERATING.  THE OTHER THREE MODULES WILL
                         BECOME OPERATIONAL ONE BY ONE UNTIL ALL ARE ON LINE.  THE SYSTEM IS NOT
                         EXPECTED TO BE FULLY OPERATIONAL (ALL FOUR MODULES) UNTIL 1982.
                         DURING DECEMBER THE BOILER EXPERIENCED ERRATIC OPERATIONS.
                         PROBLEMS WERE REPORTED.
                                                                              NO FGD SYSTEM
 1/80
       M
       SYSTEM
            86.0
            86.0
            54.4
            54.4
                        41.5
                        41.5
                                  744   568
                                   309
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE FGD SYSTEM FIGURES REFLECT THE OPERATION OF A SINGLE MODULE.  ONLY ONE
                         MODULE WILL BE NEEDED UNTIL MAY 1982 TO MEET CURRENT S02 EMISSION
                         REGULATIONS.
 2/80
 3/80
M
SYSTEM

M
SYSTEM
98.0
98.0

85.5
85.5
13.6
13.6

78.3
78.3
79.6
79.6
 1.0
 1.0

56.7
56.7
                                                                             696
                                                                                    44
                                                                             744   539
422  53.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE ONE MODULE CURRENTLY OPERATIONAL AT SAN JUAN 3 OPERATED WITHOUT ANY
                         MAJOR PROBLEMS DURING THE FIRST QUARTER OF 1980.  THE BOILER WAS OFF LINE
                         FOR APPROXIMATELY 24 DAYS IN FEBRUARY DUE TO AN ELECTRICAL PROBLEM.
 4/80  M
       SYSTEM
            92.1
            92.1
            82.7
            82.7
            90.1
            90.1
            71.8
            71.8
                      720   625
517  77.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         MINOR REPAIR WORK WAS DONE TO THE BOILER THIS MONTH.  FGO SYSTEM AVAILABIL-
                         ITY WAS OVER 90X.
 5/80
       M
       SYSTEM
           100.0
           100.0
            78.1
            78.1
           100.0
           100.0
            32.7
            32.7
                      744   311
243  35.0
                                            13-965

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  '/. REMOVAL    PER   BOILER   FGD   CAP.
                                                                SOS  PART. HOURS  HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS OUT OF SERVICE FOR A SCHEDULED MAINTENANCE  OUTAGE.

 6/80  M           49.0        43.3        39.2        27.6
       SYSTEM      49.0        43.3        39.2        27.6                   720    460    127  55.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MINOR REPAIR AND MAINTENANCE OF THE BOILER CAUSED SYSTEM OUTAGE  TIME.

                         THE FGD SYSTEM DID NOT OPERATE AFTER JUNE 19 DUE TO FAILURE OF THE MIST
                         ELIMINATOR MESH PADS AND BOTTOM BALLAST TRAY.

 7/80  M           75.5        89.8        89.8        74.5
       SYSTEM      75.5        89.8        89.8        74.5                   744    617    554  66.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS RETURNED TO SERVICE ON JULY 5 AFTER BOILER AND FGD
                         SYSTEM REPAIRS WERE MADE.

 8/80  M           83.2        81.6        82.7        80.2
       SYSTEM      83.2        81.6        82.7        80.2                   744    732    597  81.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         BEARINGS ON THE CIRCULATING PUMP WERE REPLACED DURING AUGUST.

                         A PUMP DISCHARGE VALVE WAS REPLACED DUE TO LEAKAGE.

 9/80  M           96.7        59.4        59.1        45.7
       SYSTEM      96.7        59.4        59.1        45.7                   720    549    329  61.6

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS DOWN FOR SEVERAL DAYS IN SEPTEMBER BECAUSE OF BOILER
                         TUBE  LEAKS.

                         THE FGD SYSTEM WAS NOT OPERATED DURING A SCHEDULED  OUTAGE  OF THE CHEMICAL
                         PLANT.  THE SYSTEM WAS AVAILABLE DURING THIS TIME.

 10/80  M           91.0        65.1        67.2        63.7
       SYSTEM      91.0        65.1        67.2        63.7                   744    728    474  84.2

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING OCTOBER THE BOILER WAS OUT OF SERVICE FOR APPROXIMATELY 24 HOURS
                         DUE TO A POWER TRIP CAUSED BY THE FORCED DRAFT FAN.

                         MODULE M WAS RETURNED TO SERVICE ON OCTOBER 8, 1980 FOLLOWING COMPLETION
                         OF THE CHEMICAL PLANT OUTAGE.  HOWEVER, MODULE M WAS SHUT  DOWN ON OCTOBER
                         29, 1980 TO REPLACE THE BADLY DAMAGED BOTTOM COLLECTOR TRAY.

 11/80  M           59.0        73.0        86.0        38.0
       SYSTEM      59.0        73.0        86.0        38.0                   720    372     273   38.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DUPING NOVEMBER THE BOILER WAS OUT OF SERVICE  APPROXIMATELY  312  HOURS  DUE
                         TO A  SCHEDULED MAINTENANCE OVERHAUL.  DURING THIS TIME REPAIRS WERE MADE
                         TO THE BOTTOM BALLAST TRAY AND SUPPORT BEAMS IN THE M MODULE.
                                             13-966

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         MODULE M MAS NOT OPERATED FOR APPROXIMATELY 96 HOURS DUE TO A POWER
                         FAILURE THAT CAUSED AN UPSET IN THE CHEMICAL PLANT AND CONSEQUENT LACK
                         OF ABSORBER FEED SOLUTION.

12/80  M           90.0        86.0        87.0        65.0
       SYSTEM      90.0        86.0        87.0        65.0                  744   564    484  68.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS OUT OF SERVICE APPROXIMATELY 168 HOURS DUE TO TUBE LEAKS IN
                         THE SUPERHEATER SECTION.

                         DURING DECEMBER MODULE M WAS OUT OF SERVICE APPROXIMATELY 50 HOURS DUE TO
                         AN INSPECTION FOLLOWING MAJOR REPAIRS COMPLETED IN NOVEMBER.

 1/81  M           99.9        90.0        98.0        55.0
       SYSTEM      99.9        90.0        98.0        55.0                  744   452    409  61.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY THE BOILER WAS OUT OF SERVICE APPROXIMATELY 264 HOURS TO
                         REMOVE A CLINKER AND TO REPAIR A SUPERHEATER TUBE LEAK.

                         A BOILER TRIP CAUSED BY A LOW DRUM LEVEL CAUSED A SHORT OUTAGE.

 2/81  M           81.0        80.0        80.0        75.0
       SYSTEM      81.0        80.0        80.0        75.0                  672   633    504  91.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY THE BOILER WAS OUT OF SERVICE APPROXIMATELY 48 HOURS DUE
                         TO THE REPAIRS OF THE SUPERHEATER TUBE LEAK.

                         MODULE M WAS OUT OF SERVICE APPROXIMATELY 24 HOURS DUE TO A MAINTENANCE
                         INSPECTION.

 3/81  M           98.3        97.2        97.8        96.5
       SYSTEM      98.3        97.2        97.8        96.5                  744   739    718  90.3

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH THE BOILER WAS OUT OF SERVICE FOR APPROXIMATELY AN HOUR DUE
                         TO THE FAILURE OF THE STEAM FLOW TRANSMITTER.

 4/81  M           20.0        74.0       100.0        20.0
       SYSTEM      20.0        74.0       100.0        20.0                  720   195    145  24.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL THE BOILER WAS OUT OF SERVICE APPROXIMATELY 525 HOURS DUE TO
                         A SCHEDULED MAINTENANCE OVERHAUL.

                         MODULE M WAS OUT OF SERVICE APPROXIMATELY 50 HOURS DUE THE REPLACEMENT
                         OF THE MIST ELIMINATOR BEAMS AND REPAIRING OF BRICKWORK IN THE VENTURI.

 5/81  M            7.5        36.8        36.8         5.8
       SYSTEM       7.5        36.8        36.8         5.8                  744   117     43  11.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MAY THE BOILER WAS OUT OF SERVICE APPROXIMATELY 600 HOURS DUE TO A
                         SCHEDULED MAINTENANCE OVERHAUL.

                         DURING THE BOILER OUTAGE TIME THE UPPER AND  LOWER MIST ELIMINATOR BEAMS IN
                                            13-967

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEU MEXICO: SAN JUAN 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR

                         MODULE M WERE REPLACED.

                         A PORTION OF THE ABRASION RESISTANT TILES IN THE VENTURI SCRUBBER WERE ALSO
                         REPLACED DURING MAY.
 6/81  M
       SYSTEM
            70.8
            70.8
THE BOILER WAS OUT OF SERVICE APPROXIMATELY 24 HOURS DUE TO A TUBE LEAK.


                                                    720   358    200  35.0
55.9
55.9
55.9
55.9
27.8
27.8
       **  PROBLEMS/SOLUTIONS/COMMENTS

                         TWO BOILER OUTAGES  IN JUNE WERE CAUSED  BY  SUPERHEATER TUBE LEAKS.

                         MODULE M WAS DOWN FROM  JUNE  4  THROUGH JUNE 11  TO BALANCE THE BOOSTER
                         BLOWER ROTOR.
  7/81   M
        SYSTEM
            98.1
            98.0
      96.5
      96.0
            97.3
            97.0
            96.7
            96.0
                            738
712  93.0
        «*  PROBLEMS/SOLUTIONS/COMMENTS
                          UNIT  3  HAD  TWO  ONE-DAY  OUTAGES  DURING THE  MONTH THAT RESULTED FROM FAILURE
                          OF  THE  BOILER FEED  PUMP CONTROLLER.
  8/81   M
        SYSTEM
            85.5
            85.5
      85.5
      85.5
            85.5
            85.5
            85.5
            85.5
                                                                              744   744
                                   636  97.0
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          MODULE  M WAS  DOWN FOR  FOUR  DAYS DURING THE MONTH FOR INSPECTION OF THE
                          INTERNALS.
  9/81   M
        SYSTEM
            96.8
            96.8
      31.8
      31.8
            31.8
            31.8
            31.0
            31.0
                                                                              720   701
                                                                                           223   82.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          MODULE  M  WAS  DOWN  FOR  TWO  DAYS  DURING THE  FIRST HALF OF THE MONTH FOR
                          BALANCING OF  THE BOOSTER BLOWER ROTOR.

                          A  SCHEDULED CHEMICAL PLANT OUTAGE  KEPT MODULE M OFF-LINE FROM SEPTEMBER  11
                          TO SEPTEMBER  30.
 10/81
        K
        M
        SYSTEM
             8.5
            98.2
            98.2
      11.4
      84.4
      84.4
            97.3
            97.3
             8.5
            62.4
            62.4
                                                                              744   550

        «* PROBLEMS/SOLUTIONS/COMMENTS

                          DURING  OCTOBER  THE  K  MODULE  WAS STARTED UP FOR THE FIRST TIME.
                                                                                           464  63.0
 11/81   J
        K
        M
        SYSTEM
            19.6
            96.1
            91.5
            94.0
      19.6
      91.7
      69.0
      90.0
                        19.4
                        91.0
                        68.5
                        89.0
                                                                                           644  90.0
                                    93.0        89.0                  720   714

** PROBLEMS/SOLUTIONS/COMMENTS

                  DURING NOVEMBER MODULE K BECAME AVAILABLE FOR THE FIRST TIME.

                  DURING NOVEMBER, OPERATION OF 2 MODULES (K AND M) WAS CONSIDERED NECESSARY
                  TO KEEP THE UNIT IN COMPLIANCE.
                                             13-968

-------
                                                  UTILITY F6D SURVEY:  OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE  OF  NEW MEXICO:  SAN JUAN 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  '/. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


12/81  J             .0          .0                      .0
       K           98.9        91.1                    68.3
       L           34.5        31.3                    30.4
       M           91.8        61.4                    59.5
       SYSTEM       99.5        92.2        98.4        89.4                  744   721    665  91.0

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE J MAS DOWN THE ENTIRE MONTH OF DECEMBER DUE TO A BURNED OUT BOOSTER
                         BLOWER MOTOR.

                         MODULE L WAS IN THE START-UP MODE AND MAS INOPERATIVE UNTIL DECEMBER 21.

 1/82
J
K
L
M
SYSTEM
.0
41.3
41.3
62.6
99.0
.0
39.7
39.6
57.7
97.0
.0
38.3
38.2
55.6
99.0 93.0
                                                                             744   718    695  94.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY MODULE J WAS OUT OF SERVICE FOR THIRTEEN HOURS DUE TO FAIL-
                         URE OF THE BOOSTER BLOWER MOTOR.

                         MODULE M WAS OUT OF SERVICE PART OF THE MONTH DUE TO REPAIRS TO THE
                         CIRCULATING PUMPS.

                         ON JANUARY 14 MODULES J, K, L RETURNED TO CONSTRUCTION TO RESOLVE DEFICI-
                         ENCIES.  BEGINNING ON THIS DATE, UNTIL CONSTRUCTION IS COMPLETED, THE TOTAL
                         SYSTEM CONSISTS OF THE M MODULE ONLY.

                         THE UNIT WAS SHUT DOWN OF JANUARY 31 DUE TO TUBE LEAKS.

 2/82
J
K
L
M
SYSTEM
.0
.0
.0
88.1
68.1



78.9
78.9



87.0
87.0
.0
.0
.0
62.5
62.5
                                                                             672   532    420  74.0

          PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER REMAINED OFF-LINE UNTIL FEBRUARY 5 DUE TO THE TUBE LEAKS EXPER-
                         IENCED DURING FEBRUARY AND TO REPLACE A BEARING.

                         MODULES J, K, L REMAINED OUT OF SERVICE IN FEBRUARY DUE TO CONTINUING
                         CONSTRUCTION WORK.

                         THE M MODULE START-UP WAS DELAYED UNTIL FEBRUARY 10 DUE TO FROZEN FEED
                         LINES AND BECAUSE OF A 440 VOLT TIE IN MODIFICATION.
J
K
L
M
SYSTEM
.0
.0
.0
98.2
98.2



79.7
79.7



98.0
98.0
.0
.0
.0
79.6
79.6
 3/82
                                                                             744   743    592  97.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE M WAS SHUT DOWN FROM MARCH 19 THRU MARCH 24 BECAUSE OF A CHEMICAL
                         PLANT OUTAGE WHEN NO FEED WAS AVAILABLE.

 4/82  J             .0          .0                      .0
                                            13-969

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198
-------
                                                  UTILITY F6D SURVEY:  OCTOBER 1983 - SEPTEMBER 1984
PUBLIC SERVICE  OF  NEW MEXICO:  SAN JUAN 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
 9/82
 10/82
 11/82
 12/82
                         MODULES K, L AND M HERE DOWN AT VAROUS TIMES DURING AUGUST TO REPAIR
                         BOOSTER FAN MOTORS.
J
K
L
M
SYSTEM
.0
56.4
53.2
.0
54.8
.0
95.0
91.0
.0
93.0
.0
53.1
50.8
.0
51.9
                                                                             720   402    374

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN DURING PART OF SEPTEMBER DUE TO A CHEMICAL PLANT OUTAGE.

                         MODULE J WAS DOWN DURING SEPTEMBER TO REPLACE A BOTTOM OEMISTER.

                         MODULE M WAS DOWN DURING SEPTEMBER TO REPAIR A BOOSTER FAN MOTOR.
J
K
L
M
SYSTEM
17.3
36.4
61.3
.9
58.0
5.7
36.4
36.5
.9
39.8
5.6
36.3
36.4
.9
39.7
                                                                             744   742
                                                                       295  94.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE FGD SYSTEM RESUMED OPERATION ON OCTOBER 20 AFTER A CHEMICAL PLANT
                         OUTAGE.
J
K
L
M
SYSTEM
98.2
100.0
95.4
93.3
100.0
24.6
100.0
79.9
42.9
100.0
24.6
100.0
79.9
42.9
100.0
                                                                             720   720    720  93.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE M WAS DOWN FROM NOVEMBER 1 TO NOVEMBER 3 TO BALANCE A BOOSTER FAN.

                         MODULES J AND M WERE ON STANDBY AT VARIOUS TIMES DURING THE MONTH DUE TO
                         LOW DEMAND.
J
K
L
M
SYSTEM
99.6
94.5
66.3
83.2
100.0
87.1
62.9
48.5
68.7
100.0
56.5
40.7
31.5
44.5
86.6
                                                                             744   482    644  53.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN FROM DECEMBER 4 TO DECEMBER 10 FOR A BOILER INSPECTION.

                         THE UNIT WAS DOWN FROM DECEMBER 12 TO DECEMBER 18 TO REPAIR A BOILER TUBE
                         LEAK.

                         MODULES L AND M WERE UNAVAILABLE FROM DECEMBER 13 TO DECEMBER 17 DUE TO AN
                         INSPECTION OF THE BOTTOM COLLECTOR TRAYS AND MIST ELIMINATOR SUPPORT BEAMS.

                         MODULE L WAS DOWN FROM DECEMBER 23 TO DECEMBER 27 DUE TO ELECTRICAL
                         PROBLEMS WITH A BOOSTER FAN.
 1/83  J
42.9
            42.9
                                                       42.9
                                            13-971

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 3  (CONT.)
	PERFORMANCE DATA	•	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  V. REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS FACTOR

       K           89.4        68.7                     68.7
       L           97.3        93.3                     93.3
       M           99.3        87.2                     87.2
       SYSTEM     100.0        97.4                     97.4                   744   744    724  89.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED  THAT NO MAJOR  FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING  JANUARY.

                         AS OF JANUARY 1, 1983 THE NUMBER OF MODULES COMPRISING THE TOTAL FGD SYSTEM
                         CHANGED FROM TWO TO THREE.

  2/83
  5/83
J
K
L
M
SYSTEM

97.0
78.0
40.0
71.7

100.0
86.1
28.6
71.6

93.0
68.9
22.9
61.6
                                                                              672   538    414  73.0

        **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE  UNIT  WAS  DOWN  AT  VARIOUS  TIMES  DURING FEBRUARY DUE TO BOILER-RELATED
                          PROBLEMS.

                          MODULES J,  L  AND M WERE  OUT OF  SERVICE  DURING PART OF FEBRUARY TO REPAIR A
                          BOOSTER FAN MOTOR.

                          AS OF  JANUARY 1, 1983 THE  NUMBER  OF MODULES COMPRISING THE TOTAL FGD SYSTEM
                          CHANGED FROM  TWO TO THREE.-

  3/83   J            68.0         73.1                    57.0
        K            94.0       100.0                    91.0
        L            93.0       100.0                    97.0
        M
        SYSTEM      86.6         91.0                    81.7                   744   580    608  74.0

        *»  PROBLEMS/SOLUTIONS/COMMEHTS

                          THE  UNIT  WAS  DOWN  FROM MARCH  18 TO  MARCH 20 DUE TO BOILER-RELATED PROBLEMS.

                          MODULES J AND M WERE  OUT OF SERVICE DURING MARCH FOR REPAIRS ON THE BOOSTER
                          FAN  MOTORS.

                          AS OF  JANUARY 1, 1983 THE  NUMBER  OF MODULES COMPRISING THE TOTAL FGD SYSTEM
                          CHANGED FROM  TWO TO THREE.

  4/83
J
K
L
M
SYSTEM
13.9
95.0
94.0
.0
67.6
34.1
100.0
100.0
.0
78.0
13.1
91.9
84.0
.0
63.0
                                                                              720   276    681  21.0

        **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE  UNIT WAS DOWN DURING PART OF  APRIL FOR A SCHEDULED OUTAGE.

                          THE  BOOSTER  FANS  ON MODULES J AND M WERE DOWN FOR MOTOR REPAIRS DURING
                          APRIL.
J
K
L
M
SYSTEM
48.9
98.9
98.9
.0
82.2
45.4
98.0
96.1
.0
79.8
44.9
96.9
95.0
.0
78.9
                                                                              744   736    744  62.0
                                             13-972

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO:  SAN JUAN 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       *» PROBLEMS/SOLUTIONS/COMMENTS

                         A UNIT TRIP OCCURRED ON MAY 16 DUE TO AN ELECTRICAL MAINTENANCE ERROR.

                         A CONDENSER CIRCULATION PUMP TRIPPED ON MAY 25 CAUSING A UNIT TRIP.

                         MODULE J WAS DOWN DURING MAY TO REPAIR A BOOSTER FAN MOTOR.

                         MODULE M WAS OUT OF SERVICE DURING PART OF MAY FOR BOOSTER FAN MOTOR
                         REPAIRS.

 6/83
J
K
L
M
SYSTEM
100.0
100.0
100.0
-.0
100.0
100.0
100.0
100.0
.0
100.0
95.0
94.0
94.0
.0
94.3
                                                                             720   3S5    720  71.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MECHANICAL PROBLEMS WERE ENCOUNTERED WITH A PRIMARY AIR HEATER GEAR BOX
                         ON JUNE 8.  THE UNIT WAS DOWN ON JUNE 9 AND 10 TO REPAIR THE AIR HEATER
                         GEAR BOX.

                         THE UNIT WAS DOWN FROM JUNE 11 TO JUNE 18 AND AGAIN FROM JUNE 20 TO JUNE
                         26 DUE TO A BOILER TUBE LEAK.

                         A UNIT TRIP OCCURRED ON JUNE 18 DUE TO LOW VACUUM.

  7/83
J
K
L
M
SYSTEM
84.0
9S.9
97.0
.0
93.3
74.0
95.1
90.0
.0
86.3
74.0
95.1
90.0
.0
86.3
66.4
85.3
80.8
.0
77.5
                                                                             744   668    577  72.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN APPROXIMATELY 5 DAYS DURING JULY DUE TO BOILER-RELATED
                         PROBLEMS.

                         MODULES J AND M WERE DOWN DURING JULY TO REWIND THE BOOSTER FAN MOTOR.

  8/83
J
K
L
M
SYSTEM
100.0
100.0
100.0
.0
100.0
87.8
85.1
87.0
.0
86.6
87.8
85.1
87.0
.0
86.6
42.7
41.4
42.3
.0
42.2
                                                                             744   362    314  34.0

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN APPROXIMATELY 18 DAYS DURING AUGUST DUE TO BOILER-RELATED
                         PROBLEMS.

                         MODULE M WAS DOWN DURING PART OF AUGUST TO REWIND A BOOSTER FAN MOTOR.

  9/83  J           96.9        96.0        92.2        76.8
       K           98.1        97.9       100.0        78.3
       L           98.1        97.9       100.0        78.3
       M              .0          .0           .0          .0
       SYSTEM      97.7        97.3        97.4        77.8                  720   576    560  67.0
                                            13-973

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 3 (CONT.)
	.— PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
'/. REMOVAL   PER  BOILER  FGD   CAP.
502  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
 12/83
  1/84
  2/84
  3/84
                         THE UNIT WAS DOWN APPROXIMATELY 6 DAYS DURING  SEPTEMBER  DUE TO BOOSTER-
                         RELATED PROBLEMS.

                         MODULE M WAS DOWN DURING PART OF SEPTEMBER TO  REPAIR  A BOOSTER FAN MOTOR.
10/83




J
K
L
M
SYSTEM
100.0
100.0
87.0
.0
95.7
97.1
98.0
85.0
.0
93.4
92.9
93.8
93.5

93.4
92.9
93.8
81.3
.0
89.3
                                                                              744   712
                                                                                           665   77.0
        **  PROBLEMS/SOLUTIONS/COKHENTS
                         MODULE M WAS DOWN DURING OCTOBER DUE TO  A  FAULTY  BOOSTER  FAN MOTOR.
11/83




J
K
L
M
SYSTEM
100.0
100.0
100.0
21.9
100.0
97.9
98.9
92.8
10.4
100.0
100.0
100.0
100.0
100.0
100.0
96.9
97.9
91.9
10.3
99.0
                                                                              720   713
                          713  86.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         THE  UTILITY  REPORTED  THAT NO MAJOR  FGD-RELATED  PROBLEMS WERE  ENCOUNTERED
                         DURING NOVEMBER  1983.
J
K
L
M
SYSTEM
84.9
100.0
91.0
5.0
93.6
85.0
97.1
86.0
5.1
91.0
85.0
97.1
90.5
100.0
100.0
70.0
80.0
70.8
4.2
75.0
                                                                              744   613
                                                                                           558  67.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         MODULE M WAS DOWN DURING DECEMBER  FOR  BOOSTER  FAN MOTOR  REPAIRS.
J
K
L
M
SYSTEM
99.1
100.0
99.1
20.0
100.0
99.1
83.1
99.1
18.0
99.7
99.1
100.0
99.1
106.3
100.0
99.1
83.1
99.1
18.0
99.7
                                                                              744   744
                          742  84.0
        *»  PROBLEMS/SOLUTIONS/COMMENTS
                          MODULE  M WAS DOWN  DURING  THE  MONTH  TO REPAIR A BOOSTER FAN.
                                                                              696   696
                                                                              744   740
J
K
L
M
SYSTEM
J
K
L
M
SYSTEM
100.0
99.0
100.0
.0
99.7
98.5
98.5
93.5
22.8
100.0
100.0
99.0
100.0
.0
99.7
94.0
82.0
65.0
20.0
87.0
100.0
99.0
100.0

99.7
100.0
100.0
100.0
33.9
100.0
100.0
99.0
100.0
.0
99.7
93.5
81.6
64.7
19.9
86.6
                          694  92.6
                                                                                           644  83.4
                                             13-974

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PUBLIC SERVICE  OF NEW MEXICO'-  SAN JUAN 3 (CONT. )
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGO   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
 5/84
                         MODULE M OUTAGE TIME DURING THE FIRST QUARTER OF 1984 MAS DUE, IN PART,
                         TO COLLAPSED MIST ELIMINATOR PADS.
J
K
L
M
SYSTEM

J
K
L
M
SYSTEM
 99.0
  6.9
 99.0
 96.9
100.0

 94.0
 32.0
 97.0
 96.0
100.0
99.0
 6.0
99.0
93.9
99.3

93.0
31.0
93.0
79.0
98.7
100.0
 86.0
100.0
 98.8
100.0

100.0
 88.8
100.0
100.0
100.0
99.0
 6.0
99.0
93.9
99.3

93.0
31.0
93.0
79.0
98.7
                                                                             720   720
                                                                             744   744
                                                                                        715  90.6
                                                                                          734  92.8
       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE K WAS DOWN DURING PART OF APRIL AND MAY FOR ABSORBER WALL REPAIRS.
 6/84  J
       K
       L
       M
       SYSTEM
 21.9
 73.5
 73.3
 72.6
 80.5
 9.1
86.9
90.0
89.0
91.7
 98.0
 86.9
 90.0
 98.1
100.0
 6.7
63.8
66.0
65.3
67.2
                                                                            720   528

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        MODULE J WAS DOWN DURING PART OF  JUNE  FOR  ABSORBER WALL REPAIRS.

7/84  SYSTEM                                                                 744

8/84  SYSTEM                                                                 744

9/84  SYSTEM                                                                 720

      ** PRCBLEMS/SOLUTIONS/COMMENTS

                        INFORMATION WAS UNAVAILABLE FOR THE  THIRD  QUARTER OF 1984.
                                                                                        484  67.0
                                             13-975

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGO SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M
PUBLIC SERVICE OF NEW MEXICO
SAN JUAN
4
WATERFLOW
NEW MEXICO
A
   21.         (  .050 LB/MMBTU)
  146.         (  .340 LB/MMBTU)
******         (****** LB/MMBTU)
 1560
  534
  472
  491
  534
BABCOCK & WILCOX
PULVERIZED COAL
BASE
  963.05
  120.6
  122.
CONCRETE
    8.5
(2040800 ACFM)
(  249 F)
(  400 FT)

(  28.0 FT)
  **  FUEL  DATA
      FUEL TYPE
      FUEL GRADE
      AVERAGE HEAT CONTENT - J/G
      RANGE HEAT CONTENT  - BTU/LB
      AVERAGE ASH CONTENT - 7.
      RANGE ASH CONTENT - 7.
      AVERAGE MOISTURE CONTENT  - 7.
      RANGE MOISTURE  CONTENT -  7.
      AVERAGE SULFUR  CONTENT -  7.
      RAN3E SULFUR CONTENT - 7.
      AVERAGE CHLORIDE CONTENT  - 7.
      RAN3E CHLORIDE  CONTENT -  7.

 ***  PARTICLE CONTROL

  **  ESP
      TYPE
      SUPPLIER
      INLET FLUE GAS  CAPACITY - CU.M/S
      INLET FLUE GAS  TEMPERATURE - C
      PRESSURE DROP - KPA
      PARTICLE REMOVAL EFFICENCY - 7.

  **  PARTICLE SCRUBBER
      GENERIC TYPE
      SPECIFIC TYPE
      TRADE NAME/COMMON NAME
      SHELL GENERIC MATERIAL
      SHELL SPECIFIC  MATERIAL
      LINER GENERIC MATERIAL
      LINER SPECIFIC  MATERIAL

 ***  FGD SYSTEM

  **  GENERAL DATA
      SALEABLE PRODUCT/THROWAWAY PRODUCT
      S02  REMOVAL MODE
      PROCESS TYPE
      PROCESS ADDITIVES
      SYSTEM SUPPLIER
      A-E  FIRM
      DEVELOPMENT LEVEL
      NEW/RETROFIT
COAL
SUBBITUMINOUS
18841.         (  8100 BTU/LB)
                8000-11628
   22.45
12.6-22.5
   14.82
8.1-15.0
      .80
0.6-1.3
      .07
0.00-0.09
HOT SIDE
RESEARCH-COTTRELL
 1932.7        (4095605 ACFM)
  382.2        (  720 F)
      .6        (  2. IN-H20)
   99.9
VENTURI TOWER
VARIABLE-THROAT/BOTTOM-ENTRY PLUMB BOB
N/A
CARBON STEEL
AISI 1110
INORGANIC
PREFIRED BRICK/SHAPES
SALEABLE PRODUCT
WET SCRUBBING
WELLMAN LORD
NONE
DAVY MCKEE
DAVY MCKEE
FULL SCALE
NEW
                                             13-976

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
PUBLIC SERVICE  OF NEW MEXICO:  SAN JUAN 4 (CONT.)

     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY - X   99.80
                             EFFICIENCY - '/.
UNIT DESIGN S02 REMOVAL
ENERGY CONSUMPTION - X
CURRENT STATUS
COMMERCIAL START-UP
INITIAL START-UP
CONTRACT AWARDED
 ** DESIGN AND OPERATING PARAMETERS

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     L/G RATIO - L/CU.M
     S02 REMOVAL EFFICIENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 *» REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
  90.00
   3.6
1
7/82
5/82
8/78
                                           NR
                                           NR
                                           TRAY TOWER
                                           VALVE TRAY
                                           BUBBLE CAP TRAY TOWER
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           VALVE TRAY
                                               1.0
                                               90.0
              (  7.5 GAL/1000 ACF)
                                            PRIMARY COLLECTOR
                                            IMPINGEMENT
                                            BAFFLE
                                            CLOSED VANE
                                            NR
                                            NR
                                            INDIRECT  HOT  AIR
                                            EXTERNAL  HEAT EXCHANGER
                                            STEAM  TUBE  BUNDLE
                                            NR
                                            NR
                                            CENTRIFUGAL
                                            BOOSTER
                                            FORCED DRAFT
                                            DRY
                                            CARBON STEEL
                                             Z
                                             0
                                            CENTRIFUGAL
                                            WESTINGHOUSE
                                            UNIT
                                            FORCED  DRAFT
                                            DRY
                                            CARBON  STEEL
                                            NR
                                            NR
                                            NR
                                            NR
                                            NR
                                            NR
                                            NR
                                            13-977

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 4 (CONT.)
 ** DUCTWORK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 «* PUMPS
     SERVICE
     NR
 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE

*** SALEABLE BYPRODUCTS
     NATURE

«** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY  PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     SITE TREATMENT

 ** PROCESS CONTROL  AND INSTRUMENTATION
     PROCESS STREAM
     CHEMICAL  PARAMETERS
     MONITOR TYPE
     MONITOR LOCATION
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE

 *» WATER BALANCE
     WATER  LOOP TYPE

 ** FGD SPARE  CAPACITY INDICES
     ABSORBER  - 7.

 ** FGO SPARE  COMPONENT INDICES
     ABSORBER
N9
NR
NR
NR
MIX TANK
N/A
AGITATED TANK
NUMBER

***«


NONE


SULFURIC ACID
N/A
N/A
N/A
N/A
NONE
N/A
STACK OUTLET GAS
NOX, SOa, 02, OPACITY
KVB
STACK
AUTOMATIC
FEEDBACK
CLOSED
   33.3
                                                     1.0
 	PERFORMANCE  DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY  UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS  FACTOR
5/82 N
P
R
S
SYSTEM
.0
86.8
71.8
.0
87.0
.0
54.6
47.7
.0
66.0 87.0
.0
42.3
37.0
.0
51.0




744 577 383 66.0
                                             13-978

-------
                                                  UTILITY F6D SURVEY-  OCTOBER 1983 - SEPTEMBER  1984

PUBLIC  SERVICE  OF  NEW MEXICO:  SAN JUAN 4 (CONT.)
	PERFORMANCE DATA	
PERIOD  MODULE  AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER   FGD    CAP.
                                                                502  PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         FGD SYSTEM OPERATION COMMENCED DURING MAY 1983.

                         MODULES N AND S MERE UNAVAILABLE DURING MAY DUE  TO ABSORBER  MALL REPAIRS.

                         MODULE R MAS OFF-LINE FOR FOUR DAYS TO REPAIR THE  PLUMB BOB  IN  THE VEHTURI
                         SCRUBBER.

 6/82  N           46.6        44.3                    41.8
       P           23.8        24.3                    22.9
       R           53.2        34.6                    32.6
       S           10.0        10.2                     9.6
       SYSTEM      67.8        56.7                    53.5                  720   679    385  80.0

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT HAS DOWN FROM JUNE 8 TO JUNE 10 DUE TO  BOILER RELATED  PROBLEMS.

                         MODULE N HAS DOWN FROM JUNE 1 TO JUNE 16 TO REPAIR THE ABSORBER CELL WALLS.
                         MODULE S HAS DOWN FROM JUNE 1 TO JUNE 4, ALSO FOR  ABSORBER CELL WALL
                         REPAIRS.

                         MODULES P, R AND S HERE DOWN AT VARIOUS TIMES DURING THE PERIOD OF JUNE 6
                         TO JUNE 30 FOR BOOSTER FAN MOTOR REPAIRS.

 7/82  N           99.1        93.5                    91.1
       P             .0          .0                      .0
       R             .0          .0                      .0
       S             .0          .0                      .0
       SYSTEM      49.5        46.8                    45.6                  744   725    339  91.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULES Pi R AND S WERE DOWN DURING JULY FOR BOOSTER FAN MOTOR  REPAIRS.

 8/82  N           96.6        77.3                    68.1
       P           99.7        88.3                    77.8
       R             .0          .0                      .0
       S           42.2        14.9                    13.2
       SYSTEM     100.0        90.2                    79.6                  744   656    592  76.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN FROM AUGUST 11 TO AUGUST 13 TO REPAIR A BOILER TUBE LEAK.

                         MODULES Ri S AND N WERE DOWN AT VARIOUS TIMES DURING AUGUST TO REPAIR
                         BOOSTER FAN MOTORS.

                                                       28.1
                                                       46.4
                                                       22.6
                                                        1.7
                                                       49.4                  720   393    356

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN DURING PART OF SEPTEMBER DUE TO A CHEMICAL PLANT OUTAGE.

                         MODULE R BECAME AVAILABLE AFTER THE BOOSTER FAN REPAIRS ON SEPTEMBER 9.

                         THE OPERATION OF MODULES N AND S WAS LIMITED DURING THE LATTER PART OF
                         SEPTEMBER BECAUSE THEY WERE NOT NEEDED TO KEEP THE UNIT IN COMPLIANCE.
                                            13-979
9/82 N
P
R
S
SYSTEM
56.7
56.3
30.0
34.9
88.9
51.4
85.0
41.5
3.1
90.5

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN ft (CONT. )
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION 7. REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR
10/82 N
P
R
S
SYSTEM
.0
56.3
74.9
67.3
99.3
.0
36.4
54.2
37.3
64.0
.0
34.1
50.8
34.9
59.9




744 697 446 87.0
 12/82
       ** PROBLEMS/SOLUTIONS/COMMENTS
11/82 N
P
R
S
SYSTEM
3.3
60.4
.0
70.0
66.9
1.3
87.4
.0
84.6
86.7
                         THE FGD SYSTEM RESUMED OPERATION ON OCTOBER  7
                         OUTAGE.
                                                          .8
                                                       56.0
                                                          .0
                                                       54.2
                                                       55.5
                                                     FOLLOWING A CHEMICAL PLANT
                                                           720   461
                                                                                           400  57.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
N
P
R
S
SYSTEM
100.0
99.7
32.7
99.7
100.0
90.9
83.4
5.5
91.3
100.0
       THE UNIT WAS DOWN FROM NOVEMBER 1 TO NOVEMBER 12 FOR A SCHEDULED OUTAGE.

       BOTTOM DEMISTERS WERE REPLACED IN MODULES N, P AND S DURING NOVEMBER.
       MODULES P AND S WERE BACK IN SERVICE ON NOVEMBER 13.

       MODULE N REMAINED SHUT DOWN TO REPAIR LEAKS ON A PLUMB BOB IN THE VENTURI
       SCRUBBER.

       DURING NOVEMBER MODULE R AWAITED REPLACEMENT OF A BOTTOM DEMISTER.

                                     90.3
                                     82.8
                                      5.5
                                     90.7
                                                       100.0
                                                                              744   739
                                                                                           744   92.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          MODULE  R  WAS  OUT  OF  SERVICE  FROM DECEMBER  1  TO  DECEMBER  19 TO REPLACE
                          SECTIONS  OF A BOTTOM DEMISTER.
  1/83  N
        P
        R
        S
        SYSTEM
 42.6
 99.7
 97.4
 94.9
100.0
38.1
82.4
89.2
68.8
92.8
37.5
81.2
87.9
67.7
91.4
                                                                              744   733
                                                                                           680   86.0
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE  UNIT  WAS  DOWN  ON  JANUARY  1  AND  JANUARY 6  DUE TO ELECTRICAL PROBLEMS.

                          AS OF  JANUARY 1, 1983 THE  NUMBER  OF MODULES COMPRISING THE TOTAL FGD SYSTEM
                          CHANGED FROM  TWO TO THREE.
  2/83  N
        P
        R
        S
        SYSTEM
 97.9
 99.0
 97.9
 98.3
  .9
97.9
99.0
97.9
98.6
  .9
97.9
99.0
97.9
98.6
                                                                              672   672
                                                                        662  90.0

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 4 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  F6D   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE N MAS DOWN DURING PART OF FEBRUARY TO REPAIR A BOOSTER FAN MOTOR.

 3/83  N
       P           98.9        99.3                    96.0
       R           98.9        99.3                    96.0
       S          100.0        99.3                    96.0
       SYSTEM      99.3        99.3                    96.0                  744   719    714  87.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT MAS DOWN FROM MARCH ZZ TO.MARCH 23 DUE TO ELECTRICAL PROBLEMS.

                         MODULE N WAS DOWN DURING MARCH TO REPAIR A BOOSTER FAN MOTOR.

 4/83  N             .0          .0                      .0
       P           99.0       100.0                    96.0
       R          100.0       100.0                    96.0
       S           93.1       100.0                    95.0
       SYSTEM      99.0       100.0                    95.7                  7ZO   655    720  81.0

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT MAS DOWN DURING PART OF APRIL TO REPAIR A BOILER STEAM LEAK.

                         THE MODULE N BOOSTER FAN MOTOR MAS BEING REPAIRED DURING THE MONTH OF
                         APRIL.

                                                         .0
                                                       98.9
                                                       98.9
                                                       98.0
                                                       98.6                  744   744    744  82.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING MAY.

                                                        1.0
                                                       95.0
                                                       95.0
                                                       95.0
                                                       95.3                  720   711    720  77.0

       ** PROBLEMS/SOLUTIONS/COMHENTS

                         A UNIT TRIP OCCURRED FROM JUNE 5 TO JUNE 6 DUE TO A LOW BOILER DRUM  LEVEL.

                         MODULE N WAS DOWN DURING PART OF JUNE TO REPAIR A FAN.
5/83 N
P
R
S
SYSTEM
.0
98.9
98.9
98.0
98.6
.0
98.9
98.9
98.0
98.6
6/83 N
P
R
S
SYSTEM
3.1
100.0
100.0
100.0
100.0
1.0
96.2
96.2
96.2
96.5
7/83 N
P
R
S
SYSTEM
100.0
100.0
100.0
20.0
100.0
79.9
95.9
95.0
.0
90.3
100.0
100.0
100.0
.0
100.0
68.5
82.3
81.5
.0
77.4
                                                                             744   638    576  71.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN FOR APPROXIMATELY 5 DAYS DURING JULY TO REPLACE EXPANSION
                         JOINTS.
                                            13-981

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 4 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL    PER   BOILER   FGD   CAP.
                                                                S02   PART. HOURS  HOURS  HOURS  FACTOR

                         THE UNIT WAS DOWN FROM JULY 30 TO JULY 31 DUE TO BOILER-RELATED PROBLEMS.

                         MODULE S WAS DOWN DURING PART OF JULY TO REPAIR AN  ABSORBER  TRAY SUPPORT
                         BEAM.
 8/83
       N
       P
       R
       S
       SYSTEM
 84.9
100.0
 98.0
 98.0
100.0
66.6
98.2
63.4
63.4
97.2
65.1
96.0
62.0
62.0
95.0
744   727
                                                                                          707  85.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
 9/83
N
P
R
S
SYSTEM
99.0
70.0
79.0
99.0
100.0
99.0
51.9
46.9
99.0
99.0
                         A UNIT TRIP OCCURRED FROM AUGUST 4 TO AUGUST 5 DUE TO BOILER/TURBINE RE-
                         LATED PROBLEMS.

                         MODULE N WAS DOWN DURING PART OF AUGUST FOR BOOSTER  FAN MOTOR REWIRING.

                         MODULES R AND S WERE DOWN DURING PART OF AUGUST TO INSTALL  NEW  SUMP LEVEL
                         CONTROLS.
                                                       99.0
                                                       51.9
                                                       46.9
                                                       99.0
                                                       99.0                  720    720     713  85.0
       **  PROBLEMS/SOLUTIONS/COMMENTS
                         MODULE P WAS DOWN DURING PART OF SEPTEMBER TO INSPECT A CHLORIDE  PRESCRUB-
                         BER SPRAY HEADER.

                         MODULE R WAS DOWN DURING PART OF SEPTEMBER TO REMOVE A CHLORIDE PRESCRUBBER
                         SPRAY HEADER.
 10/83
N
P
R
S
SYSTEM
100.0
79.0
99.5
.0
92.8
97.0
78.6
97.0
.0
90.9
97.0
78.6
97.0

90.9
96.5
78.2
96.5
.0
90.4
                                                                              744    740
                                                                                           673  83.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          MODULE  S WAS DOWN DURING OCTOBER DUE TO ABSORBER  SUMP  BRICK WALL LINER
                          FAILURE.
 11/83
 12/83
N
P
R
S
SYSTEM
N
P
R
S
SYSTEM
96.0
26.9
96.9
.0
73.3
98.9
.0
98.9
.0
65.9
95.0
25.0
96.9
.0
72.3
98.9
.0
98.9
.0
65.9
95.0
25.0
96.9

72.3
98.9
.0
98.9
.0
65.9
95.0
25.0
96.9
.0
72.3
98.9
.0
98.9
.0
65.9
                                                                              720    720
                                                                              744   744
                                                                        521  85.0
                                                                        491  86.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         MODULES  P  AND  S WERE  DOWN  DURING  NOVEMBER  AND  DECEMBER  DUE TO ABSORBER
                         BRICK WALL LINER  FAILURES.
 1/84  N
                    93.0
                                94.4
                                            95.0
                                                        92.1
                                             13-982

-------
                                                  UTILITY F6D SURVEY:  OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE  OF  NEW MEXICO:  SAN JUAN 4 (CONT.)
PERIOD MODULE AVAILABILITY OPERABILITY
P
R
S
SYSTEM
2/84 N
P
R
S
SYSTEM
3/84 N
P
R
S
SYSTEM
.0
93.0
.0
62.0
81.3
.0
78.7
.0
53.4
96.2
.0
70.4
24.7
63.8
.0
94.4
.0
63.0
92.0
.0
88.1
.0
60.0
79.9
.0
57.0
21.0
52.6
RELIABILITY
.0
95.0

63.3
92.0
.0
88.0
.0
60.0
100.0
.0
73.9
86.1
86.7
UTILIZATION •/. REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR
.0
92.1
.0
61.4
79.6
.0
76.1
.0
51.9
79.3
.0
56.6
20.8
52.2



744 725 457 83.9




696 602 361 73.6




744 739 389 86.9
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         MODULES P AND S WERE DOWN DURING THE FIRST QUARTER OF 1984 TO REPAIR
                         ABSORBER SUMP WALLS.
4/84 N
P
R
S
SYSTEM
41.4
.0
.0
41.4
27.6
80.9
.0
.0
70.1
50.3
80.9
.0
.0
70.1
50.3
33.5
.0
.0
29.0
20.8
                                                                             720   298    150  34.4

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULES P AND R WERE DOWN DURING APRIL TO REBUILD ABSORBER WALLS.
5/84 N
P
R
S
SYSTEM
.0
1.6
.9
1.2
1.3
.0
30.2
17.6
22.6
23.5

30.0
17.5
22.5
23.3
.0
1.6
.9
1.2
1.3
                                                                             744    40      9   2.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED A UNIT OUTAGE DURING MAY.

                         MODULES P, R AND S WERE DOWN DURING MAY FOR ABSORBER WALL REPAIRS.
6/84 N
P
R
S
SYSTEM
48.8
67.8
81.8
81.8
93.4
47.9
38.6
87.5
82.4
85.5
100.0
74.1
87.5
82.4
100.0
38.9
31.4
71.1
66.9
69.4
                                                                             720   585    500  69.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULES N AND P WERE DOWN DURING JUNE FOR ABSORBER WALL REPAIRS.

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720
                                            13-983

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

PUBLIC SERVICE OF NEW MEXICO: SAN JUAN 4 (CONT. )
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE THIRD QUARTER OF 1984.
                                            13-984

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MU
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY M/FGD - MW
NET UNIT GENERATING CAPACITY MO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RAN3E MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - Y.
     RAN3E SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
     NUMBER
     TYPE

 ** ESP
     NUMBER
     NUM3ER OF SPARES
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*** FGD SYSTEM
SALT RIVER PROJECT
CORONADO
1
ST. JOHNS
ARIZONA
  344.
  301.
  700
  400
  350
  355
  320
RILEY STOKER
PULVERIZED COAL
BASE
 1226.94
  387.8
  152.
CONCRETE
    5.8
    .100 LB/MMBTU)
    .800 LB/MMBTU)
    .700 LB/MMBTU)
 (2600000 ACFM)
 (  730 F)
 (  500 FT)

 (  19.0 FT)
COAL
SUBBITUMINOUS
25121.

   15.00
******
   16.00
12.0-20.0
     .55
0.4-1.0
********
******
 0
NONE
 2
 0
HOT SIDE
WESTERN PREC.
 1321.3
  404.4
      .8
   99.8
 (  10800 BTU/LB)
  8000-12000
DIVISION, JOY
 (2800000 ACFM)
 (   760 F)
 (   3. IN-H20)
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                             13-985

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SALT RIVER PROJECT: CORONADO 1 (CONT.)
 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X
     DESIGN COAL HEAT CONTENT - J/G
     SPACE REQUIREMENTS - SQ M
     OPER. 4 MAINT. REQUIREMENT - MANHR/DAY

 ** QUENCHER/PRESATURATOR
     NUMBER
     TYPE
     SUPPLIER
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUM3ER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIKCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     MANUFACTURER
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     FREEBOARD DISTANCE - M
     DISTANCE BETWEEN STAGES - CM
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIMESTONE
 NONE
 M.W. KELLOGG
 BECHTEL, SALT RIVER PROJECT
 FULL SCALE
 NEW
X   99.87
    82.00
     1.3
  1
 12/79
 11/79
  6/76
     1.00
 19305.8
  6066.4
   164.0
(   8300 BTy/LB)
(   65300 SQ FT)
 QUENCH DUCT
 PULLMAN KELLOGG
   260.02       (  551000 ACFM)
   148.9        (   300 F)
 CARBON STEEL
 AISI 1110
  Z
  0
 SPRAY TOWER
 OPEN CROSSCURRENT SPRAY
 HORIZONTAL SPRAY CHAMBER
 PULLMAN KELLOGG
 120.0 X 28.0 X 17.0
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 GLASS FLAKE-FILLED POLYESTER
 DUDICK
 NONE
  4
  2520.
     9.7
      .4
     6.6
   260.02
   148.9
    98.0
(40000 GPM)
(  72.6 GAL/1000 ACF)
  1.5 IN-H20)
  21.6 FT/S)
  551000 ACFM)
   300 F)
 PRIMARY COLLECTOR
  2
  0
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 HEIL
 VERTICAL
     1
     3
     8.84
     1.78
(29.0 FT)
(  .7 IN)
                                            13-986

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER
SALT RIVER PROJECT:  CORONAOO 1 (CONT.)

     DISTANCE BETWEEN VANES - CM
     PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     MASH MATER SOURCE
     MASH RATE - L/S

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     LOCATION
     PERCENT GAS BYPASSED - AVG
     TEMPERATURE INCREASE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE

 *« DAMPERS
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 *» DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
    3.0        (
     .1        (
    4.6        (
ORGANIC
POLYPHENYLENE
COOLING TOWER SLOWDOWN
   39.4
1.20 IN)
 .5 IN-H20)
15.0 FT/S)
               (  625 GAL/MIN)
BYPASS
COLD SIDE
N/A
OUTLET DUCT
   20.0
   27.8        (   50 F)
CARBON STEEL; INORGANIC iLINEDi
HYDRAULICALLY-BONDED MORTAR
2
0
CENTRIFUGAL
GREEN FAN
BOOSTER
FORCED DRAFT
DRY
304.32
127.2
1.9
CARBON STEEL







( 644880 ACFM)
( 261 F)
(6.2 IN-H20)

LOUVER
NR
AMOCO
CARBON STEEL
AISI 1110
NONE
N/A
GUILLOTINE
NR
MOSSER
STAINLESS STEEL
NR
NONE
N/A
SCRUBBER INLET
RECTANGULAR
15.6 X 13.0
CARBON STEEL
AISI 1110
NONE
N/A
SCRUBBER OUTLET
RECTANGULAR
33.0 X 18.0
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED  POLYESTER
MET BALL MILL
COMPARTMENTED
NR
                                            13-987

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

SALT RIVER PROJECT: CORONADO 1 (CONT.)

     MANUFACTURER
     NUMBER
     FULL LOAD DRY FEED CAPACITY - M.TONS/HR
     PRODUCT QUALITY - X SOLIDS

 ** TANKS
     SERVICE
     ABSORBER  RECYCLE
     MAKEUP WATER
     MIST ELIMINATOR WASH
     SEAL WATER
     REAGENT PREP  PRODUCT
     WASTE SLURRY  BLEED

 ** PUMPS
     SERVICE
     SLURRY RECIRCULATION
     SLUDGE DISPOSAL
     SLURRY PURGE
     ALKALI MAKEUP
     PROCESS WATER
     SEAL WATER
     HIGH PRESSURE SEAL WATER
     MIST ELIMINATOR WASH

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

*** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT
     SITE DIMENSIONS
     SITE SERVICE LIFE - YRS

 ** PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     PHYSICAL VARIABLES
     CONTROL LEVELS
     MONITOR TYPE
     MONITOR LOCATION
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE
MINE & SMELTER CORP.
 2
   11.8
   20.0
                                                NUMBER
                                                               (   13 TPH)
NUMBER

  10
THICKENER
 1
0
105.0 DIA X 12.0
CARBON STEEL
AISI 1110
ORGANIC
POLYVINYL CHLORIDE
ABSORBER BLEED
10X SOLIDS
30 PERCENT SOLIDS, PH 7.0
TO UNDERFLOW TANKS * REACTION MIX TANKS
TO QUENCHER, BALL MILLS, REACTION MIX TANK t PUM
THICKENED
N/A
N/A
FINAL
POND
ON-SITE
PIPELINE
CLAY LINING
300 ACRES
 35
SOZ INLET CONCENTRATION GAS FLOW, PH
INLET GAS FLOW
PH 6.2 AT ABSORBER OUTLET
UNILOC FLOW-THROUGH PH PROBES; LEAR SIEGLER FM-1
INLET DUCT, 1ST 4 4TH STAGES  (PH]
MANUAL [PHI, AUTOMATIC IS021
FEEDBACK
                                            13-988

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SALT RIVER  PROJECT:  CORONADO 1 (CONT.)


 ** MATER BALANCE
     WATER  LOOP TYPE                            OPEN
     EVAPORATION WATER LOSS - LITER/S              13.2        (  210 6PM)
     POND SEEPAGE/RUNOFF WATER LOSS - LITERS/S  0
     MAKEUP WATER ADDITION - LITERS/S              17.0        (  270 GPM)
     SOURCE OF MAKEUP WATER                     COOLING TOWER SLOWDOWN

 »* CHEMICALS AND CONSUMPTION
     FUNCTION                                   ABSORBENT
     NAME                                       LIMESTONE
     PRINCIPAL CONSTITUENT                      912 CAC03
     UTILIZATION - X                               87.0
     POINT  OF ADDITION                          BALL MILL

 ** FGD SPARE CAPACITY INDICES
     ABSORBER - X                                    .0
     MIST ELIMINATOR - X                             .0
     FAN -  X                                         .0
     THICKENER - X                                   .0

 ** FGD SPARE COMPONENT INDICES
     ABSORBER                                        . 0
     MIST ELIMINATOR                                 .0
     FAN                                             .0
     THICKENER                                       .0
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


33/    SYSTEM                                                                720

 5/80  SYSTEM                                                                744

 6/80  SYSTEM                                                                720

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         ALTHOUGH FGD SYSTEM PERFORMANCE DATA ARE BEING LOGGED, THE UTILITY REPORTED
                         THAT THE INFORMATION IS UNAVAILABLE FOR RELEASE AT THIS TIME.

 7/80  SYSTEM                                                                744

 8/80  SYSTEM                                                                744

 9/80  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY WILL NOT AUTHORIZE THE RELEASE OF FGD PERFORMANCE DATA AT
                         THIS TIME, BUT NOTED THAT THE SYSTEM IS TO SHUT DOWN ON NOVEMBER 1, 1980
                         FOR A MAJOR OVERHAUL.

10/80  SYSTEM                                                                744

11/80  SYSTEM                                                                720

12/80  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         ON NOVEMBER 8, 1980 THE UNIT WAS TAKEN OFF LINE FOR A MAJOR  OVERALL
                         THAT IS EXPECTED TO LAST FOR APPROXIMATELY 45 DAYS.

                         THE PERFORMANCE DATA ARE NOT YET AVAILABLE FOR RELEASE.

 1/81  SYSTEM                                                                74*
                                            13-989

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

SALT RIVER PROJECT: CORONADO 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   Z  REMOVAL   PER  BOILER  FGD   CAP.
                                                                 502   PART.  HOURS HOURS  HOU3S  FACTOR


 2/81  SYSTEM                                                                 672

 3/81  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FIRST QUARTER 1981 A FEW MINOR PROBLEMS MERE ENCOUNTERED DUE TO
                         A LINING FAILURE.

                         THE PERFORMANCE NUMBERS ARE NOT AVAILABLE FOR  PUBLICATION AT THIS  TIME.

 4/81  SYSTEM                                                                 720

 5/81  SYSTEM                                                                 744

 6/81  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION FOR THE SECOND QUARTER 1981 WAS  NOT  AVAILABLE.

 7/81  SYSTEM                                                                 7*4

 8/81  SYSTEM                                                                 744

 9/81  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY HAS REPORTED PROBLEMS WITH  THE PREKRETE LINERS IN THE  PRE-
                         SATURATORS Am BYPASS DUCTS OF BOTH UNITS 1  AND  2.   THE STRUCTURAL SUPPORT
                         UPON WHICH THE MATERIAL IS APPLIED IS INADEQUATE.   PIECES OF MATERIAL FROM
                         THE TOP AND SIDES OF THE DUCTWORK DROP  AWAY.   SPARE FGD SYSTEM CAPACITY
                         HAS KEPT THIS FROM  LIMITING BOILER AVAILABILITY.

                         THERE HAVE BEEN CONTINUING PROBLEMS WITH  THE PVC LINERS IN THE THICKENERS.
                         THICKENER SPARE CAPACITY HAS KEPT THIS  FROM  AFFECTING  AVAILABILITY OF THE
                         FGD SYSTEM. THE LINERS ARE PATCHED AS NEEDED.

 10/81  SYSTEM                                                                 744

 11/81  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING OCTOBER AND  NOVEMBER THE SYSTEM  WAS OFF-LINE FOR A SCHEDULED
                         MAINTENANCE OUTAGE.

 12/81  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE PREKRETE LINE PROBLEMS CONTINUED THROUGHOUT  THE QUARTER.

 1/82  SYSTEM                                                                 744

 2/82  SYSTEM                                                                 672

 3/82  SYSTEM                                                                 744

 4/82  SYSTEM                                                                 720

 5/82  SYSTEM                                                                 744
                                             13-990

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983  - SEPTEMBER  1984

SALT RIVER  PROJECT:  CORONADO 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD    CAP.
                                                                S02   PART. HOURS  HOURS   HOURS  FACTOR


 6/82  SYSTEM                                                                 720

 7/82  SYSTEM                                                                 744

 8/82  SYSTEM                                                                 74*

 9/82  SYSTEM                                                                 720

10/82  SYSTEM                                                                 744

11/82  SYSTEM                                                                 720

12/82  SYSTEM                                                                 744

 1/83  SYSTEM                                                                 744

 2/83  SYSTEM                                                                 672

 3/83  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE  PERIOD OF  JANUARY 1982 TO MARCH 1983.

 4/83  SYSTEM                                                                 720

 5/83  SYSTEM                                                                 744

 6/83  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION MAS UNAVAILABLE FOR THE  PERIOD OF  JANUARY 1982 TO JUNE 1983.

 7/83  SYSTEM                                                                 744

 8/83  SYSTEM                                                                 744

 9/83  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE  THIRD QUARTER OF 1983.

10/83  SYSTEM                                                                 744

11/83  SYSTEM                                                                 720

12/83  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS  WERE ENCOUNTERED
                         DURING THE FOURTH QUARTER OF 1983.

 1/84  SYSTEM                                                                 744

 2/84  SYSTEM                                                                 696

 3/84  SYSTEM                                                                 744

 4/84  SYSTEM                                                                 720

 5/84  SYSTEM                                                                 744
                                             13-991

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SALT RIVER PROJECT'- CORONADO 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-REUTEO PROBLEMS WERE ENCOUNTERED
                         DURING THE FIRST THREE QUARTERS OF 1984.
                                            13-992

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 198
-------
UTILITY FGD SURVEY'. OCTOBER 1983 - SEPTEMBER 198*

SALT RIVER PROJECT: CORONADO 2 (CONT.)
 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X
     DESIGN COAL HEAT CONTENT - J/G
     SPACE REQUIREMENTS - SQ M
     OPER. & MAINT. REQUIREMENT - MANHR/DAY

 ** QUENCHER/PRESATURATOR
     NUMBER
     TYPE
     SUPPLIER
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUFERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X

 ** MIST ELIMINATOR
     FRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE N4ME/COMMON TYPE
     MANUFACTURER
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     FREEE30ARD DISTANCE - M
     DISTANCE BETWEEN STAGES - CM
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIMESTONE
 NONE
 M.W. KELLOGG
 BECHTEL, SALT RIVER PROJECT
 FULL SCALE
 NEW
X   99.87
    82.00
     1.3
  1
 10/81
  7/80
  6/76
     1.00
 19305.8
  6066.*
   164.0
(   8300 BTU/LB)
(   65300 SQ FT)
 QUENCH DUCT
 PULLMAN KELLOGG
   260.02       ( 551000 ACFM)
   1*8.9        (  300 F)
 CARBON STEEL
 AISI 1110
  2
  0
 SPRAY TOWER
 OPEN CROSSCURRENT SPRAY
 HORIZONTAL SPRAY CHAMBER
 PULLMAN KELLOGG
 120.0 X 28.0 X 17.0
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 GLASS FLAKE-FILLED POLYESTER
 DUDICK
 NOME

  2520.         (*0000 GPM)
     9.7        ( 72.6 GAL/1000 ACF)
      .*        ( 1.5 IN-H20)
     6.6        ( 21.6 FT/S)
   260.02       ( 551000 ACFM)
   1*8.9        (  300 F)
    98.0
 PRIMARY COLLECTOR
  2
  0
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 HEIL
 VERTICAL
     1
     3
     8.8*
     1.78
(29.0 FT)
(   .7 IN)
                                            13-99*

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
SALT RIVER PROJECT:  CORONADO 2 (CONT.)

     DISTANCE BETWEEN VANES - CM
     PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     MASH WATER SOURCE
     WASH RATE - L/S

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     LOCATION
     PERCENT GAS BYPASSED - AVG
     TEMPERATURE INCREASE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE

 *» DAMPERS
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 *» DAMPERS
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 »* DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
    3.0        ( 1.20 IN)
     .1        (  .5 IN-H20)
    4.6        ( 15.0 FT/S)
ORGANIC
POLYPHENYLENE
COOLING TOWER SLOWDOWN
   39.4        (  625 GAL/MIN)
BYPASS
COLD SIDE
N/A
OUTLET DUCT
   20.0
   27.8        (    50 F)
CARBON STEEL; INORGANIC (LINED)
HYDRAULICALLY-BONDED MORTAR
 2
 0
CENTRIFUGAL
GREEN FAN
BOOSTER
FORCED DRAFT
DRY
  304.32
  127.2
    1.9
CARBON STEEL
(  644880 ACFM)
(   261 F)
(  6.2 IN-H20)
LOUVER
NR
ANDCO
CARBON STEEL
AISI 1110
NONE
N/A
GUILLOTINE
NR
MOSSER
STAINLESS STEEL
NR
NONE
N/A
SCRUBBER INLET
RECTANGULAR
15.6 X 13.0
CARBON STEEL
AISI 1110
NONE
N/A
SCRUBBER OUTLET
RECTANGULAR
33.0 X 18.0
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER
WET BALL MILL
COMPARTMENTED
NR
                                            13-995

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SALT RIVER PROJECT: CORONADO 2 (CONT.)
     MANUFACTURER
     NUMBER
     FULL LOAD DRY FEED CAPACITY - M.TONS/HR
     PRODUCT QUALITY - X SOLIDS

 ** TANKS
     SERVICE
     ABSORBER RECYCLE
     MAKEUP WATER
     MIST ELIMINATOR MASH
     SEAL WATER
     REAGENT PREP PRODUCT
     WASTE SLURRY BLEED

 ** PUMPS
     SERVICE
     SLURRY RECIRCULATION
     SLUDGE DISPOSAL
     SLURRY PURGE
     ALKALI MAKEUP
     PROCESS WATER
     SEAL WATER
     HIGH PRESSURE SEAL WATER
     MIST ELIMINATOR WASH

 *» SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

 *** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT
     SITE DIMENSIONS
     SITE SERVICE LIFE - YRS

 ** PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     PHYSICAL VARIABLES
     CONTROL LEVELS
     MONITOR TYPE
     MONITOR LOCATION
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE
MINE & SMELTER CORP.
 Z
   11.8        (  13 TPH)
   20.0
NUMBER
NUMBER

  10
   4
   4
   1
   2
   1
   2
   2
THICKENER
 1
0
105.0 OIA X 12.0
CARBON STEEL
AISI 1110
ORGANIC
POLYVINYL CHLORIDE
ABSORBER BLEED
10X SOLIDS
30 PERCENT SOLIDS, PH 7.0
TO UNDERFLOW TANKS & REACTION MIX TANKS
TO QUENCHER, BALL MILLS, REACTION MIX TANK t PUM
THICKENED
N/A
N/A
FINAL
POND
ON-SITE
PIPELINE
CLAY LINING
300 ACRES
 35
S02 INLET CONCENTRATION GAS FLOW, PH
INLET GAS FLOW
PH 6.2 AT ABSORBER OUTLET
UNILOC FLOW-THROUGH PH PROBES; LEAR SIEGLER FM-1
INLET DUCT, 1ST i 4TH STAGES  [PH]
MANUAL CPH), AUTOMATIC [S021
FEEDBACK
                                            13-996

-------
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SALT RIVER PROJECT:  CORONAOO Z (CONT.)


 ** WATER BALANCE
     WATER LOOP TYPE                            OPEN
     EVAPORATION WATER LOSS - LITER/S              13.2        (   210 6PM)
     POND SEEPAGE/RUNOFF WATER LOSS - LITERS/S  0
     MAKEUP WATER ADDITION - UTERS/S              17.0        (   270 6PM)
     SOURCE OF MAKEUP WATER                     COOLING TOWER SLOWDOWN

 ** CHEMICALS AND CONSUMPTION
     FUNCTION                                   ABSORBENT
     NAME                                       LIMESTONE
     PRINCIPAL CONSTITUENT                      91X CAC03
     UTILIZATION - X                               87.0
     POINT OF ADDITION                          BALL MILL

 »* FGD SPARE CAPACITY INDICES
     ABSORBER - X                                    .0
     MIST ELIMINATOR - X                             .0
     FAN - X                                         .0
     THICKENER - X                                   .0

 «* FGD SPARE COMPONENT INDICES
     ABSORBER                                        .0
     MIST ELIMINATOR                                 .0
     FAN                                             .0
     THICKENER                                       .0
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                502  PART. HOURS HOURS  HOURS FACTOR


 8/80  SYSTEM                                                                7*4

 9/80  SYSTEM                                                                720

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         INITIAL OPERATION OF THE FGD SYSTEM AT THE CORONADO Z STATION COMMENCED
                         IN JULY, 1980.

                         DURING THE THIRD QUARTER 1980 A BEARING INSPECTION WAS CONDUCTED.  THE UNIT
                         IS PRESENTLY IN THE PROCESS OF BEGINNING COMMERCIAL OPERATION.

 10/80  SYSTEM                                                                744

 11/80  SYSTEM                                                                720

 12/80  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE PERFORMANCE DATA ARE NOT YET AVAILABLE FOR RELEASE.

 1/81  SYSTEM                                                                744

 2/81  SYSTEM                                                                672

 3/81  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FIRST QUARTER 1981 THE UTILITY REPORTED THAT NO MAJOR  FGD-RELAT-
                         ED PROBLEMS WERE ENCOUNTERED.

                         THE PERFORMANCE DATA ARE NOT YET AVAILABLE FOR RELEASE AT THIS TIME.

 4/81  SYSTEM                                                                720

 5/81  SYSTEM                                                                744
                                            13-997

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

SALT RIVER PROJECT: CORONADO 2 (CONT.)
	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   X REMOVAL   PER  BOILER  FGD    CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR


 6/81  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION FOR THE SECOND QUARTER  1981 WAS  NOT AVAILABLE.

 7/81  SYSTEM                                                                 7*4

 8/81  SYSTEM                                                                 7**

 9/81  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY HAS REPORTED PROBLEMS WITH  THE PREKRETE LINERS  IN THE  PRE-
                         SATUSAT03S AND BYPASS DUCTS OF BOTH UNITS 1  AND 2.   THE STRUCTURAL SUPPORT
                         UPON WHICH THE MATERIAL IS APPLIED  IS INADEQUATE.   PIECES OF  MATERIAL FROM
                         THE TOP AND SIDES OF THE DUCTWORK DROP  AWAY.   SPARE FGD SYSTEM CAPACITY
                         HAS KEPT THIS FROM  LIMITING BOILER  AVAILABILITY.

                         THERE HAVE BEEN CONTINUING PROBLEMS WITH THE  PVC LINERS IN  THE THICKENERS.
                         THICKENER SPARE CAPACITY HAS KEPT THIS  FROM  AFFECTING AVAILABILITY OF THE
                         FGD SYSTEM. THE LINERS ARE PATCHED  AS NEEDED.

10/81  SYSTEM                                                                 74*

11/81  SYSTEM                                                                 720

12/81  SYSTEM                                                                 7**

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING NOVEMBER AND DECEMBER THE SYSTEM WAS  TAKEN  OFF-LINE  FOR A SCHEDULED
                         MAINTENANCE OUTAGE.

                         DURING THE FOURTH QUARTER THE PREKRETE  LINER  PROBLEMS CONTINUED.

 1/82  SYSTEM                                                                 744

 2/82  SYSTEM                                                                 672

 3/82  SYSTEM                                                                 744

 4/82  SYSTEM                                                                 720

 5/82  SYSTEM                                                                 744

 6/82  SYSTEM                                                                 720

 7/82  SYSTEM                                                                 744

 8/82  SYSTEM                                                                 744

 9/82  SYSTEM                                                                 720

10/82  SYSTEM                                                                 744

11/82  SYSTEM                                                                 720

12/82  SYSTEM                                                                 744

 1/83  SYSTEM                                                                 744

 2/83  SYSTEM                                                                 672
                                             13-998

-------
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SALT RIVER  PROJECT:  CORONADO 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGO   CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR


 3/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE PERIOD OF JANUARY 1982 TO MARCH 1983.

 4/83  SYSTEM                                                                720

 5/83  SYSTEM                                                                744

 6/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE PERIOD OF JANUARY 1982 TO JUNE 1983.

 7/83  SYSTEM                                                                744

 8/83  SYSTEM                                                                744

 9/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE THIRD QUARTER OF 1983.

 10/83  SYSTEM                                                                744

 11/83  SYSTEM                                                                720

 12/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED  THAT NO MAJOR FGD-RELATED  PROBLEMS WERE ENCOUNTERED
                         DURING THE FOURTH  QUARTER OF 1983.

 1/84  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED  THAT NO MAJOR FGD-RELATED  PROBLEMS  WERE ENCOUNTERED
                         DURING THE FIRST THREE  QUARTERS OF 1984.
                                             13-999

-------
UTILITY FGD SURVEY : OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUM3ER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY H/FGD - MM
NET UNIT GENERATING CAPACITY HO/FGD - MM
EQUIVALENT SCRUBBED CAPACITY - MM

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M
SAN MIGUEL ELECTRIC
SAN MIGUEL
1
SAN MIGUEL
TEXAS
  516.
******
  400
  400
  380
  400
  400
BABCOCK * MILCOX
PULVERIZED COAL
BASE
  943.80
  151.7
  137.
CONCRETE
     (   .100 LB/MMBTU)
     f  1.200 LB/MMSTU)
     (****** LB/MMBTU)
     (2000000 ACFM)
     (  305 F)
     (  450 FT)
               (***** FT)
 **  FUEL DATA
      FUEL TYPE
      FUEL GRADE
      AVERAGE HEAT CONTENT - J/G
      RAN3E HEAT CONTENT - BTU/LB
      AVERAGE ASH CONTENT - 7.
      RANGE ASH CONTENT - '/.
      AVERAGE MOISTURE CONTENT - 7.
      RANGE MOISTURE CONTENT - 7.
      AVERAGE SULFUR CONTENT - 7.
      RANGE SULFUR CONTENT - 7.
      AVERAGE CHLORIDE CONTENT - 7.
      RANGE CHLORIDE CONTENT - 7.

 ***  PARTICLE CONTROL

 **  ESP
      NUMBER
      TYPE
      SUPPLIER
      INLET FLUE GAS CAPACITY - CU.M/S
      INLET FLUE GAS TEMPERATURE - C
      PRESSURE DROP - KPA

 »*  PARTICLE SCRUBBER
      NUMBER
      GENERIC TYPE
      SPECIFIC TYPE
      TRADE NAME/COMMON NAME
      SHELL GENERIC MATERIAL
      SHELL SPECIFIC MATERIAL
      LINER GENERIC MATERIAL
      LINER SPECIFIC MATERIAL
      GAS CONTACTING DEVICE TYPE

 ***  FGD SYSTEM

 **  GENERAL DATA
      SALEABLE PRODUCT/THROWAWAY PRODUCT
      S02 REMOVAL MODE
      PROCESS TYPE
      PROCESS ADDITIVES
      SYSTEM SUPPLIER
      A-E FIRM
COAL
LIGNITE
11630.

   38.00
25.0-45.0
   30.00
******
    2.39
1.5-3.0
      .06
0.01-0.25
COLD SIDE
BABCOCK 4
  943.8
  151.7
     .2
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
THROWAHAY PRODUCT
WET SCRUBBING
LIMESTONE
NONE
BABCOCK t HILCOX
TIPPETT & GEE
     (   5000 BTU/LB)
      4200-6350
MILCOX
     (2000000 ACFM)
     (   305 F)
     (   1. IN-H20)
                                             13-1000

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
SAN MIGUEL ELECTRIC:  SAN MIGUEL 1 (CONT.)

     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN 302  REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     SPACE REQUIREMENTS - SQ M

 ** QUENCHER/PRESATURATOR
     NUMBER
     TYPE
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X

 »* MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     NUMBER OF STAGES
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     NUM3ER OF SPARES
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
FULL SCALE
NEW
   86.00
    5.0
 1
10/81
 8/81
 0/75
18209.8
(  196015 SQ FT)
 4
ABSORBER INLET
  314.62       ( 666700 ACFM)
  151.7        (  305 F)
NR
NR
 4
 1
TRAY TOWER
SIEVE TRAY
N/A
BABCOCK & WILCOX
CARSON STEEL
AISI 1110
N/A
ORGANIC
NR
NR
PLASTIC/RUBBER MOBILE BALLS
 Z
 1250.         (19840 GPM)
    6.0        (45.0 GAL/1000 ACF)
    3.5        (14.0 IN-H20)
  203.06       ( 440900 ACFM)
   54.4        (  130 F)
   86.0
PRIMARY COLLECTOR
IMPINGEMENT
BAFFLE
CLOSED VANE
    2
NR
NR
INDIRECT HOT AIR
EXTERNAL HEAT EXCHANGER
STEAM TUBE BUNDLE
NR
NR
 2
 0
AXIAL
UNIT
FORCED DRAFT
DRY
 1016.47        (2154000 ACFM)
  151.7         (   305 F)
CARBON STEEL
                                            13-1001

-------
UTILITY FGD SURVEY; OCTOBER 1983 - SEPTEMBER 1934

SAN MIGUEL ELECTRIC: SAN MIGUEL 1 (CONT.)
 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE

 ** DUCTWORK
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 ** PUMPS
     SERVICE
      NR
  ** SOLIDS  CONCENTRATING/DEWATERING
      DEVICE
      OUTLET STREAM  CHARACTERISTICS

  ** SOLIDS  CONCENTRATING/DEWATERING
      DEVICE
      FEED STREAM  SOURCE
      FEED STREAM  CHARACTERISTICS
      OUTLET STREAM  CHARACTERISTICS

 »** SLUDGE

  ** TREATMENT
      METHOD
      DEVICE
      PROPRIETARY  PROCESS

  ** DISPOSAL
      NATURE
      TYPE
      LOCATION
      SITE TREATMENT

  »* PROCESS CONTROL AND  INSTRUMENTATION
      CHEMICAL PARAMETERS
      PROCESS CONTROL MANNER
      PROCESS CHEMISTRY MODE
                    2
                    0
                  AXIAL
                  UNIT
                  FORCED DRAFT
                  DRY
                  CARBON STEEL
                  SHUT-OFF
                  NR
                  NR
                   SHUT-OFF
                   NR
                   NR
                   NR
                   NR
                   NR
                   NR
                   WET BALL  MILL
                   NR
                   NR
                                                NUMBER

                                                ****
                   THICKENER
                   30X SOLIDS
                   VACUUM FILTER
                   THICKENER
                   30X SOLIDS
                   60 '/. SOLIDS
                   STABILIZATION
                   PUG MILL
                   RESEARCH-COTTRELL
                   FINAL
                   LANDFILL
                   OFF-SITE
                   NONE
                   PH,SOLIDS
                   AUTOMATIC
                   FEEDBACK
  *#  WATER  BALANCE
      WATER LOOP  TYPE
      MAKEUP WATER  ADDITION  -
LITERS/S
CLOSED
   37.6
                                                                (   600  GPM)
                                             13-100Z

-------
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 198*

SAN MIGUEL ELECTRIC:  SAN MIGUEL 1 (CONT.)


 ** CHEMICALS AND CONSUMPTION •
     FUNCTION                                   ABSORBENT
     NAME                                       LIMESTONE
     PRINCIPAL CONSTITUENT                      9SX CAC03
     CONSUMPTION                                24 TPH
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 8/81  SYSTEM                                                                744

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE SAN MIGUEL FGD SYSTEM BEGAN OPERATIONS ON AUGUST 13 WHEN ONE OF THE
                         FOUR MODULES WAS STARTED UP.

                         THE FGD SYSTEM WAS REMOVED FROM SERVICE FOR ONE WEEK AT THE END OF AUGUST
                         TO CORRECT VALVE PROBLEMS.  THE VALVES WERE DESIGNED FOR SINGLE
                         DIRECTIONAL FLOW, HOWEVER, SOME BI-DIRECTIONAL FLOWS WERE OCCURRING
                         WHICH WAS RESULTING IN VALVE FAILURE.

 9/81  SYSTEM                                                                720

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         SINCE INITIAL STARTUP, TWO OF THE THREE MODULES HAVE BEEN OPERATED ON AN
                         ALTERNATING BASIS.  THE LIMITED OPERATION HAS RESULTED FROM BOILER PROBLEMS
                         ENCOUNTERED.  THE BOILER WILL BE SHUT DOWN ON OCTOBER 16 FOR ONE
                         MONTH SO THAT CORRECTIVE MAINTENANCE CAN BE PERFORMED.

                         PROBLEMS HAVE BEEN ENCOUNTERED WITH THE LIMESTONE FEED SYSTEM.  THE
                         PROBLEMS HAVE BEEN ATTRIBUTED TO EXCESSIVE RAINFALL WHICH HAS
                         CAUSED CLUMPING OF THE MATERIAL.

10/81  SYSTEM                                                                744

11/81  SYSTEM                                                                720

12/81  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS SHUTDOWN FROM MID-OCTOBER THRU NOVEMBER DUE TO BOILER-RELATED
                         PROBLEMS.  THE UNIT OPERATED APPROXIMATELY SOX DURING DECEMBER.

                         THE FGD SYSTEM HAS EXPERIENCED ABSORBER PLUGGING PARTICULARLY IN THE MIST
                         ELIMINATOR AND SPRAY NOZZLES.

                         THE UTILITY HAS EXPERIENCED PROBLEMS WITH THE LIMESTONE SLURRY  PREPARATION
                         SYSTEM.

 1/82  SYSTEM                                                                744

 2/82  SYSTEM                                                                672

 3/82  SYSTEM                                                                744

       ** PRCBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY HAS REPORTED PROBLEMS WITH THE SUPPORT BRACING  ON ALL  FOUR
                         ABSORBER TANKS.  VIBRATIONS CAUSED BY THE AGITATORS COUPLED WITH  INADEQUATE
                         TANK BRACING HAS CAUSED THE TANKS TO LEAK.  EACH TANK MUST  NOW  BE  DRAINED
                         AND RETRACED BY BSW.  THE REPAIR PROCESS WILL TAKE APPROXIMATELY  2-4 WEEKS
                         FOR EACH TANK.  SPARE FGD SYSTEM CAPACITY HAS KEPT THIS FROM  LIMITING
                         BOILER AVAILABILITY.  THE UNIT WAS SHUTDOWN FOR  2-WEEKS IN  MARCH  FOR A
                         SCHEDULED OUTAGE.
                                            13-1003

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SAN MIGUEL ELECTRIC: SAN MIGUEL 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   X  REMOVAL   PER   BOILER  FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS  FACTOR

                         THE UTILITY IS ALSO EXPERIENCING PROBLEMS WITH  DUCTWORK CORROSION.  THE
                         AREA IN QUESTION IS WHERE THE COMMON PLENUM  FROM ABSORBERS AND INDIRECT HOT
                         AIR REHEAT DUCT MEET  (MIXING CHAMBER).  THE  MICA-FLAKE  LINER BECAME
                         DETACHED FROM THE CARBON STEEL DUCTWORK DUE  TO  TEMPERATURE FLUCTUATIONS.
                         THE REPLACEMENT LINER, SYNTHETIC RUBBER MATERIAL,  IS PRESENTLY FAILING DUE
                         TO POOR APPLICATION AROUND CONNECTING AREAS  (DUCT  JOINTS,  BEFORE AND  AFTER
                         EXPANSION JOINTS AND  DAMPERS).

 4/82  SYSTEM                                                                 720

 5/82  SYSTEM                                                                 744

 6/82  SYSTEM                                                                 720

       **  PROBLEMS/SOLUTION'S/COr^tENTS

                         THE UTILITY CONTINUES TO EXPERIENCE PROBLEMS WITH  DUCTWORK CORROSION.  THE
                         TWO CONTRIBUTING FACTORS TO THE PROBLEM ARE  THE HORIZONTAL DESIGN OF  THE
                         DUCTWORK WHICH ALLOWS POOLS OF MOISTURE TO COLLECT IN CORNERS AND AT  THE
                         BOTTOM OF THE DUCTWORK, AND LINEAR CRACKING  AT  DUCT RISERS AND CONNECTING
                         AREAS WHICH ALLOWS MOISTURE TO SEEP THROUGH  AND CORRODE THE DUCTWORK.

                         UTILITY ALSO REPORTS  EXPERIENCING PROBLEMS IN ISOLATING MODULES BECAUSE
                         THE DOUBLE LOUVRE SEAL AIR DAMPERS WILL NOT  SEAL DUE TO SCALE AND FLYASH
                         BUILDUP.  MAINTENANCE CREWS MUST WEAR BREATHING APPARATUSES WHEN WORKING
                         INSIDE THE MODULES.

                         THE UTILITY ALSO REPORTED A TWO DAY OUTAGE IN JUNE DUE  TO  A PROCESS
                         CONTROLLER FAILURE WHICH OPERATES AND CONTROLS  THE PUMPS,  VALVES, ECT.

                         THE UTILITY REPORTED  THAT FGD SYSTEM AVAILABILITY  THROUGHOUT THE SECOND
                         QUARTER WAS APPROXIMATELY 85X.  THE UTILITY  HAS SCHEDULED  A MAJOR OUTAGE
                         PERIOD IN THE FALL TO MAKE ALL REPAIRS.

  7/82  SYSTEM                                                                 744

  8/82  SYSTEM                                                                 744

  9/82  SYSTEM                                                                 720

 10/82  SYSTEM                                                                 744

 11/82  SYSTEM                                                                 720

 12/82  SYSTEM                                                                 744

       »*  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FALL OUTAGE PERIOD, THE UTILITY ALSO REPORTED REPLACING  10
                         RUBBER EXPANSION JOINTS THAT HAD FAILED.  THE REPLACEMENT  JOINTS ARE
                         CONSTRUCTED OF STAINLESS STEEL REINFORCED VITON.

                         THE UTILITY REPORTED  THAT THE FGD SYSTEM  AVAILABILITY THROUGHOUT THE  LAST
                         SIX MONTHS OF THE YEAR WAS APPROXIMATELY  75X.

                         THE UTILITY REPORTED  THAT THE UNIT WAS  DOWN  MOST OF THE FALL MONTHS TO
                         REBUILD THE INLET DAMPERS TO THE ABSORBER MODULES.  THE UTILITY HAS
                         EXPERIENCED CONTINUAL PROBLEMS WITH THE DAMPERS SEALING DUE TO SCALE  AND
                         FLYASH BUILDUP.

  1/83  SYSTEM                                                                 744

  2/83  SYSTEM                                                                 672

  3/83  SYSTEM                                                                 744
                                             13-1004

-------
                                                  UTILITY F60 SURVEY:  OCTOBER 1983 - SEPTEMBER 1984

SAN MIGUEL ELECTRIC:  SAN MIGUEL 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** FROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE UNIT WAS DOWN ALL OF MARCH TO BEGIN REPAIRS
                         ON ABSORBER OUTLET DAMPERS.  THE FRP COATED CARBON STEEL DAMPERS WERE
                         CORRODING AT THE EDGES WHERE THE FRP HAD FLAKED OFF.  THE EDGES OF THE
                         BLADES WILL BE REPLACED WITH HASTELLOY C-276 AND RECOATED WITH FRP.

 4/83  SYSTEM                                                                720

 5/83  SYSTEM                                                                744

 6/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         REPAIRS TO THE ABSORBER OUTLET DAMPERS CONTINUED THROUGHOUT APRIL AND MAY.

                         THE UTILITY REPORTED EXPERIENCING SCALING PROBLEMS WITH THE FIRST TRAY OF
                         THE ABSORBERS.  ADIPIC ACID TESTS ARE SCHEDULED FOR AUGUST TO SEE IF THE
                         MATERIAL WILL REDUCE SCALING AND ENHANCE S02 REMOVAL.   THE SYSTEM IS PRE-
                         SENTLY NOT MEETING ITS DESIGNED REMOVAL EFFICIENCY.OF  88X.

                         THE UTILITY PLANS TO REPAIR THE CHEMICAL RESISTANT GROUT IN THE ABSORBER
                         OUTLET DUCTS DURING THE NEXT MAJOR OUTAGE PERIOD.

                         THE UTILITY REPORTED THAT THE FGD SYSTEM AVAILABILITY  DURING THE PERIOD OF
                         JANUARY THROUGH JUNE OF 1983 WAS APPROXIMATELY 60X.

 7/83  SYSTEM                                                                744

 8/83  SYSTEM                                                                744

 9/83  SYSTEM                                                                720

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE THIRD QUARTER.  FGD SYSTEM AVAILABILITY DURING THE PERIOD WAS
                         APPROXIMATELY 100X.

                         THE UTILITY RECEIVED ITS FIRST LOAD OF AOIPIC ACID ON NOVEMBER 16.  AL-
                         THOUGH SCHEDULED FOR AUGUST, TESTING WILL COMMENCE IN LATE NOVEMBER OR
                         EARLY DECEMBER.

                         THE UTILITY REPORTED EXPERIENCING MINOR SOFT SCALING PROBLEMS WITH THE MIST
                         ELIMINATORS.  THE UTILITY PLANS TO ADJUST OR MAKE CHANGES TO ITS MIST ELIM-
                         INATOR WASH SYSTEM IN ORDER TO CORRECT THE PROBLEM.

 10/83  SYSTEM                                                                744

 11/83  SYSTEM                                                                720

 12/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE PERIOD.  THE FGD SYSTEM AVAILABILITY  FOR THE PERIOD WAS  APPROX-
                         IMATELY 100 PERCENT.

                         ADIPIC ACID TESTING BEGAN IN DECEMBER.  PRELIMINARY RESULTS  INDICATE  THAT
                         THE USE OF A BUFFERING AGENT IS HIGHLY COST EFFECTIVE.  S02  REMOVAL EFFI-
                         CIENCY IS UP AND SCALE FORMATIONS ARE MINIMAL.   TESTING SHOWS  LIMESTONE
                                            13-1005

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER

SAN MIGUEL ELECTRIC: SAN MIGUEL 1 (CONT.)
.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   X  REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR

                         UTILIZATION TO BE 95 PERCENT WITH  ITS USE COMPARED TO 85 PERCENT WITHOUT.
                         PRESENT LIMESTONE CONSUMPTION WITHOUT THE USE  OF A BUFFERING AGENT IS 700
                         TONS/DAY.  TESTS INDICATE THAT  LIMESTONE  CONSUMPTION MAY BE DECREASED AS
                         MUCH AS 60 PERCENT.  THE UTILITY HAS BEEN TESTING  VARIOUS AMOUNTS OF BOTH
                         DIBASIC AND MONOBASIC ACIDS FROM 2 TO 6 TONS/DAY.   E.  F.  DUPONT IS ONE OF
                         TWO PRESENT SUPPLIERS.  DUE TO  GOOD CRYSTAL  GROWTH WITH THE UliE OF A
                         BUFFERING AGENT, THE UTILITY ALSO BELIEVES THAT  FLOCCULANT CONSUMPTION
                         WILL ALSO BE DECREASED.
                         THE UNIT WAS DOWN FOR 10 DAYS IN OCTOBER  DUE TO  A  PLUGGED SUPERHEATER.
                         CLINKER, WHICH HAD PLUGGED THE  SUPERHEATER,  HAD  TO BE REMOVED WITH EXPLO-
                         SIVES.

       SYSTEM                                                                 7**

       SYSTEM                                                                 696

 3/8*  SYSTEM                                                                 7**

 */8*  SYSTEM                                                                 720

 5/8*  SYSTEM                                                                 7**

 6/8*  SYSTEM                                                                 720

 7/8*  SYSTEM                                                                 744

 8/8*  SYSTEM                                                                 7**

 9/8*  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE FIRST THREE  QUARTERS  OF 198*.
                                            13-1006

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 198*
                                           SECTION 13
              DESIGN AND  PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE  EMISSION LIMITATION - NG/J
502 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MM
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER  SUPPLIER
     BOILER  TYPE
     BOILER  SERVICE LOAD
     DESIGN  BOILER FLUE GAS FLOW - CU.M/S
     BOILER  FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 »* FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - X
     RANGE ASH CONTENT - X
     AVERAGE MOISTURE CONTENT - X
     RAKSE MOISTURE CONTENT - X
     AVERAGE SULFUR CONTENT - X
     RANGE SULFUR CONTENT - X
     AVERAGE CHLORIDE CONTENT - X
     RANGE CHLORIDE CONTENT - X

*** PARTICLE CONTROL

 ** ESP
     NUMBER
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - X

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*** FGO SYSTEM

 ** GENERAL  DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL M33E
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM  SUPPLIER
SEMINOLE ELECTRIC
SEMINOLE
1
PALATKA
FLORIDA
A
   19.         (
  384.         (
******
 1240
  620
  600
  495
  620
FOSTER WHEELER
PULVERIZED COAL
BASE
                  .045 LB/MMBTU)
                  .660 LB/MMBTU)
               (****** LB/MMBTU)
               (2132000 ACFM)
               ( 267 F)
               ( 675 FT)

               ( 92.8 FT)
               (  11700 BTU/LB)
                11000-12500
 1006.09
  130.6
  206.
CONCRETE
   28.3
COAL
BITUMINOUS
27214.

   10.00
6.0-10.0
   10.00
9.0-11.0
    2.75
1.5-3.0
      .22
******
COLD SIDE
RESEARCH-COTTRELL
 1006.1        (2132000 ACFM)
  130.6        (  267 F)
     .6        (  3. IN-H20)
   99.6
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
THROWAWAY PRODUCT
WET SCRUBBING
LIMESTONE
NONE
PEABODY PROCESS SYSTEMS
                                            13-1007

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

SEMINOLE ELECTRIC: SEMINOLE i (CONT.)

     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     SPACE REQUIREMENTS - SO M

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     L/G RATIO -  L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL  EFFICIENCY - X
     PARTICLE REMOVAL EFFICENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
                   (   21675  SQ FT)
   BURNS  &  ROE
   FULL SCALE
   NEW
      86.00
     1
     2/84
     5/83
     2/80
     2013.6
    NR
    NR
     5
     1
    SPRAY  TOWER
    OPEN COUNTERCURRENT  SPRAY
    N/A
    PEABODY  PROCESS  SYSTEMS
    27.0 DIA X 89.0
    CARBON STEEL
    ASTM A-283
    N/A
    ORGANIC
    GLASS  FLAKE-FILLED POLYESTER;  NATURAL RUBBER
    NR
    NONE
     5
        7.1
        1.4
        3.7
     1006.09
       51.7
       86.0
         .0
    NR
    NR
    NR
    NR
    NR
    NR
     0
    NR
    NR
    NR
    NR
    NR
    CENTRIFUGAL
    NR
    FORCED DRAFT
    DRY
    CARBON STEEL
    NR
    NR
    NR
    NR
    NS
    NR
    NR
(  53.0 GAL/1000 ACF)
(  5.6 IN-H20)
(  12.2 FT/S)
(2132000 ACFM)
(   125 F)
13-1008

-------
SEMINOLE ELECTRIC:  SEMINOLE i CCONT.)
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
 »* DUCTWORK
     LOCATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 »* DUCTWORK
     LOCATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 *» REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 *# TANKS
     SERVICE
     REAGENT PREP PRODUCT
     ABSORBER RECYCLE
     NR
     THICKENER OVERFLOW
     EMERGENCY DELUGE

 »* PUMPS
     SERVICE
     MILL RECYCLE
     REAGENT SLURRY TRANSFER
     ABSORBER RECIRCULATION
     WASH SLURRY
     WASTE SLURRY
     SUPERNATANT

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE

 *** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     SITE TREATMENT

 ** PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE
ID FAN OUTLET
13.0 X 18.0
CARBON STEEL
ASTM A-242
NONE
N/A
FGO OUTLET
13.0 X 12.0
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER
WET BALL MILL
NR
NR
                                                NUMBER
   1
   5
****

   1
NUMBER

   2
   2
   5
   2
   3
   2
NA
FORCED OXIDATION
NA
CONVERSION SYSTEMS [POZ-0-TECJ
FINAL
LANDFILL
NR
DENSITY, PH
MANUAL-EQUIP. START STOP! AUTO-PROCESS CONTROL
FEEDBACK
                                             13-1009

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SEMINOLE ELECTRIC: SEMINOLE i CCONT.)
	.	PERFORMANCE DATA		
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL    PER   BOILER   FGD   CAP.
                                                                S02   PART. HOURS  HOURS   HOURS FACTOR


 5/83  SYSTEM                                                                 744

 6/83  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM COMMENCED OPERATION IN MAY AND IS CURRENTLY  IN THE STARTUP
                         PHASE OF OPERATION.

 7/83  SYSTEM                                                                 744

 8/83  SYSTEM                                                                 744

 9/83  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE FGD SYSTEM OPERATED APPROXIMATELY 30 TO
                         40 DAYS SINCE START-UP IN MAY 1983.

                         OUTAGE TIME DURING THE THIRD QUARTER OF 1983 MAS DUE  PRIMARILY  TO TURBINE-
                         RELATED PROBLEMS.

10/83  SYSTEM                                                                 744

11/83  SYSTEM                                                                 720

12/83  SYSTEM                                                                 744

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE FGD SYSTEM OPERATED INEFFICIENTLY DURING THE
                         FOURTH QUARTER DUE TO MIST ELIMINATOR PLUGGING PROBLEMS.

 1/84  SYSTEM                                                                 744

 2/84  SYSTEM                                                                 696

 3/84  SYSTEM                                                                 744

 4/84  SYSTEM                                                                 720

 5/84  SYSTEM                                                                 744

 6/84  SYSTEM                                                                 720

 7/84  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED  DURING  THE PERIOD OF JANUARY
                         THROUGH JULY, 1984.

 8/84  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A MODULE OUTAGE  LASTING 11 HOURS OCCURRED DURING AUGUST  DUE TJ  A BROKEN
                         SUPERNATE HEADER.

                         THE UTILITY REPORTED THAT DURING AUGUST EACH MODULE WAS  TAKEN OUT  IN
                         ROTATION FOR MIST ELIMINATOR SCALE CLEANING.
                                             13-1010

-------
                                                  UTILITY FGD SURVEY:  OCTOBER  1983 -  SEPTEMBER  1984

SEMINOLE  ELECTRIC:  SEMINOLE i (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD    CAP.
                                                                SQZ  PART.  HOURS HOURS  HOURS FACTOR

                         THE UTILITY REPORTED THAT THE MODULE "CHARLIE" WAS DOWN PART OF AUGUST
                         DUE TO REPAIRS ON A FIBERGLASS STORAGE TANK.

 9/8*  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR SEPTEMBER.
                                             13-1011

-------
UTILITY FGD SURVEY? OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUM3ER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
SOZ EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY H/FGD - MM
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 »* FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

»** PARTICLE CONTROL

 ** ESP
     NUMBER
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUBBER
     NUMSER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
SEMINOLE ELECTRIC
SEMINOLE
Z
PALATKA
FLORIDA
A
   19.
  284.
******
 1240
  620
  600
  495
  620
FOSTER WHEELER
PULVERIZED COAL
BASE
               (  .045 LB/MMBTU)
               (  .660 LB/MMBTU)
               {****** LB/MMBTU)
               (2132000 ACFM)
               (  267 F)
               (  675 FT)

               (  92.8 FT)
               (  11700 BTU/LB)
                11000-12500
 1006.09
  130.6
  206.
CONCRETE
   28.3
COAL
SUEBITUMINOUS
27214.

    8.50
6.0-10.0
   10.00
9.0-11.0
    2.75
1.5-3.0
     .22
******
COLD SIDE
RESEARCH-COTTRELL
 1006.1        (2132000 ACFM)
  130.6        (   267 F)
     .6        (   3. IN-H20)
   99.6
 0
NONE
N/A
N/A
CARBON STEEL
AISI 1110
ORGANIC; INORGANIC
GLASS FLAKE-FILLED POLYESTER; PREFIRED BRICK/SHA
N/A
THROWAWAY PRODUCT
WET SCRUBBING
LIMESTONE
NONE
PEABODY PROCESS SYSTEMS
                                            13-1012

-------
     UTILITY FGD SURVEY: OCTOBER  1983  - SEPTEMBER
SEMINOLE  ELECTRIC:  SEMINOLE 2 CCONT.)

     A-E  FIRM                                   BURNS 4 ROE
     DEVELOPMENT LEVEL                          FULL SCALE
     NEW/RETROFIT                               NEW
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X        86.00
     CURRENT STATUS                              1
     COMMERCIAL START-UP                         1/85
     INITIAL START-UP                            9/84
     CONTRACT AWARDED                            2/80

 ** DESIGN AND OPERATING PARAMETERS
     SPACE REQUIREMENTS - SQ M                   2013.6

 »* QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUM5ER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES                  5
     L/G RATIO - L/CU.M                             7.1
     GAS-SIDE PRESSURE DROP - KPA                   1.4
     SUPERFICAL GAS VELOCITY - M/SEC                3.7
     INLET GAS FLOW - OK M/S                    1006.09
     INLET GAS TEMPERATURE - C                     51.7
     S02 REMOVAL EFFICIENCY - X                    86.0
     PARTICLE REMOVAL EFFICENCY - X                   .0

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR        NR
     NUMBER PER SYSTEM                           5
     GENERIC TYPE                               NR
     SPECIFIC TYPE                              NR
     TRADE NAME/COMMON TYPE                     NR
     CONSTRUCTION MATERIAL GENERIC TYPE         NR
     CONSTRUCTION MATERIAL SPECIFIC TYPE        NR

 ** REHEATER
     GENERIC TYPE                               NR
     SPECIFIC TYPE                              NR
     TRADE NAME/COMMON TYPE                     NR
     CONSTRUCTION MATERIAL GENERIC TYPE         NR
     CONSTRUCTION MATERIAL SPECIFIC TYPE        NR

 ** FANS
     DESIGN                                     CENTRIFUGAL
     FUNCTION                                   NR
     APPLICATION                                FORCED DRAFT
     SERVICE                                    DRY
     CONSTRUCTION MATERIAL GENERIC TYPE         CARBON STEEL

 ** DAMPERS
     FUNCTION                                   NR
     GENERIC TYPE                               NR
     SPECIFIC TYPE                              NR
     CONSTRUCTION MATERIAL GENERIC TYPE         NR
     CONSTRUCTION MATERIAL SPECIFIC TYPE        NR
     LINER GENERIC MATERIAL TYPE                NR
     LINER SPECIFIC MATERIAL TYPE               NR
                   (   21675 SQ FT)
    NR
    NR
     5
     1
    SPRAY  TOMER
    OPEN COUNTERCURRENT SPRAY
    N/A
    PEABODY PROCESS SYSTEMS
    27.0 DIA X 89.0
    CARBON STEEL
    ASTM A-283
    N/A
    ORGANIC
    GLASS  FLAKE-FILLED POLYESTER;  NATURAL RUBBER
    NR; BLACK NATURAL RUBBER
    NONE
                   (  53.0 GAL/1000 ACF)
                   (  5.6 IN-H20)
                   (  12.2 FT/S)
                   (2132000 ACFM)
                   (   125 F)
13-1013

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
SEMINOLE ELECTRIC: SEMINOLE 2 
-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER

SEMINOLE  ELECTRIC:  SEMINOLE z (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR


       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT INITIAL START UP AT SEMINOLE 2 COMMENCED IN
                         SEPTEMBER 1984.
                                             13-1015

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

  »* UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

  ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

  ** ESP
     NUMBER
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

  «» PARTICLE SCRUBBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*#* FGD SYSTEM

  ** GENERAL DATA
     SALEABLE PRODUCT/THRQWAWAY PRODUCT
     502 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
SIKESTON BRD OF MUNICIPAL UTIL
SIKESTON
1
SIKESTON
MISSOURI
D
M*****         (****** LB/MMBTU)
******         (****** LB/MMBTU)
******         (****** LB/MMBTU)
  207
  235
  207
  211
  235
BABCOCK i WILCOX
PULVERIZED COAL
BASE
  353.17       (
  142.2        (
  137.         (
CARBON STEEL
  748390 ACFM)
  288 F)
  450 FT)
*******
COAL
BITUMINOUS
26377.

   11.20
9.9-15.2
    9.50
8.7-19.5
    2.80
2.3-3.3
      .08
0.06-0.12
COLD SIDE
BABCOCK I WILCOX
  398.7
  153.9
     .2
   99.6
               (*»*** FT)
(  11340 BTU/LB)
 9435-11692
(  844824 ACFM)
(   309 F)
(   1. IN-H20)
VENTURI TOWER
VARIABLE-THROAT/SIDE-MOVABLE BLOCKS
N/A
NR
NR
NR
NR
NONE
THROWAWAY PRODUCT
WET SCRUBBING
LIMESTONE
BABCOCK & WILCOX
PHIPS-HOGLAND, PHILLIPS, BURNS * MCD
FULL SCALE
                                             13-1016

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
                                                  153.9
                                                NR
                                                NR
                                                    8.
SIKESTON BRD  OF  MUNICIPAL UTIL: SIKESTON 1 (CONT.)

     NEW/RETROFIT                               NEW
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY - X   99.17
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X        80.00
     ENERGY CONSUMPTION - X                         1.7
     CURRENT STATUS                              1
     COMMERCIAL  START-UP                         9/81
     INITIAL START-UP                            6/81
     CONTRACT AWARDED                           11/77
** DESIGN AND  OPERATING PARAMETERS

»* QUENCHER/PRESATURATOR
    NUMBER
    INLET GAS  TEMPERATURE - C
    CONSTRUCTION MATERIAL GENERIC TYPE
    CONSTRUCTION MATERIAL SPECIFIC TYPE

«* ABSORBER
    NUMBER
    NUMBER OF  SPARES
    GENERIC TYPE
    SPECIFIC TYPE
    TRADE NAME/COMMON TYPE
    SUPPLIER
    SHELL GENERIC MATERIAL
    SHELL SPECIFIC MATERIAL
    SHELL MATERIAL TRADE NAME/COMMON TYPE
    LINER GENERIC MATERIAL
    LINER SPECIFIC MATERIAL
    LINSR MATERIAL TRADE NAME/COMMON TYPE
    L/G RATIO  - L/CU.M
    GAS-SIDE PRESSURE DROP - KPA
    INLET GAS  FLOW - CU. ft/5
    INLET GAS  TEMPERATURE - C
    S02 REMOVAL EFFICIENCY - X
    PARTICLE REMOVAL EFFICENCY - X

** MIST ELIMINATOR
    PRE-MIST ELIMINATOR/MIST ELIMINATOR
    GENERIC TYPE
    SPECIFIC TYPE
    TRADE NAME/COMMON TYPE
    CONSTRUCTION MATERIAL GENERIC TYPE
    CONSTRUCTION MATERIAL SPECIFIC TYPE

** REHEATER
    GENERIC TYPE
    SPECIFIC TYPE
    TRADE NAME/COMMON TYPE
    CONSTRUCTION MATERIAL GENERIC TYPE
    CONSTRUCTION MATERIAL SPECIFIC TYPE

** FANS
    NUMBER
    DESIGN
    SUPPLIER
    FUNCTION
    APPLICATION
    SERVICE
    FLUE GAS FLOW RATE - CU.M/S
    FLUE GAS TEMPERATURE - C
    CONSTRUCTION MATERIAL GENERIC TYPE

** DAMPERS
    FUNCTION
    GENERIC TYPE
    SPECIFIC TYPE
    CONSTRUCTION MATERIAL GENERIC TYPE
    CONSTRUCTION MATERIAL SPECIFIC TYPE
    LINER GENERIC MATERIAL TYPE
    LINER SPECIFIC MATERIAL TYPE
(   309 F)
                                                 3
                                                 1
                                                VENTURI TOWER
                                                NR
                                                NR
                                                BABCOCK i WILCOX
                                                CARBON STEEL
                                                AISI 1110
                                                N/A
                                                ORGANIC
                                                GLASS FLAKE-FILLED POLYESTER
                                                NR
                                                  142
                                                   80
                                                               ( 60.0 GAL/1000 ACF)
                                                               (11.0 IN-H20)
                                                               ( 927000 ACFM)
                                                               (  289 F)
                                                   99.6
                                                PRIMARY COLLECTOR
                                                IMPINGEMENT
                                                BAFFLE
                                                CLOSED VANE
                                                NR
                                                NR
                                                NR
                                                NR
                                                NR
                                                NR
                                                NR
                                                AXIAL
                                                BABCOCK ft WILCOX
                                                NR
                                                FORCED DRAFT
                                                DRY
                                                  389.32        ( 825000 ACFM)
                                                  142.2         (  288 F)
                                                CARBON STEEL
                                                NR
                                                NR
                                                NR
                                                NR
                                                NR
                                                NR
                                                NR
                                            13-1017

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SIKESTON BRD OF MUNICIPAL UTIL: SIKESTON 1 (CONT.)
 ** DUCTWORK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 »* REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER

 ** TANKS
     SERVICE
     NR

  **  PUMPS
     SERVICE
      NA

  ** SOLIDS  CONCENTRATING/DEWATERING
      DEVICE

 *«» SLUDGE

  ** TREATMENT
      METHOD
      DEVICE
      PROPRIETARY  PROCESS

  ** DISPOSAL
      NATURE
      TYPE
      SITE TREATMENT
      SITE DIMENSIONS
      SITE SERVICE LIFE  -  YRS

  ** PROCESS CONTROL AND INSTRUMENTATION
      PROCESS CONTROL MANNER
      PROCESS CHEMISTRY  MODE

  ** WATER BALANCE
      WATER  LOOP TYPE
      MAKEUP WATER ADDITION -  LITERS/S

  ** FGD SPARE CAPACITY  INDICES
      ABSORBER - X

  ** FGD SPARE COMPONENT INDICES
      ABSORBER
NR
NR
N9
NR
WET BALL MILL
NR
NR
KOPPERS
NUMBER

****


NUMBER

****


NR
BLEED
N/A
N/A
FINAL
POND
NONE
54 ACRES
  8
AUTOMATIC & MANUAL
FEED FORWARD
OPEN
   11.7
   50.0
                                                     1.0
               (  186 GPM)
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY  OPERABILITY  RELIABILITY  UTILIZATION  X REMOVAL    PER   BOILER   FGD   CAP.
                                                                S02   PART.  HOURS  HOURS   HOURS FACTOR
  6/81   SYSTEM

        »* PROBLEMS/SOLUTIONS/COMMENTS
                             720
                          THE  FGD  OPERATION COMMENCED  ON JUNE  30,  1981.   THE  SYSTEM IS IN THE STARTUP
                          PHASE  OF OPERATION.
  7/81   SYSTEM
                                             13-1018

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

SIKESTON BRD OF MUNICIPAL UTIL: SIKESTON 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD   CAP.
                                                                502  PART. HOURS HOURS  HOURS  FACTOR


 8/81  SYSTEM                                                                7*4

 9/81  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SIKESTON 1 FGD SYSTEM DID NOT OPERATE DURING THE THIRD QUARTER 1981.
                         THE BOILER WAS OPERATIONAL; HOWEVER, FULL SCALE OPERATION OF THE FGD
                         SYSTEM IS NOT EXPECTED UNTIL JANUARY 1982.

10/81  SYSTEM                                                                7*4

11/81  SYSTEM                                                                720

12/81  SYSTEM                                                                7*4

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM OPERATED  IN  A START-UP  PHASE DURING DECEMBER.  COMPLIANCE
                         TESTING IS SCHEDULED  FOR MID-JANUARY.

 1/82  SYSTEM                                                                7*4

 2/82  SYSTEM                                  .                              672

 3/82  SYSTEM                                                                74*

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM TESTED OUT WELL  DURING  TWO SEPARATE COMPLIANCE TESTS WHICH
                         WERE CONDUCTED DURING THE FIRST QUARTER OF 1982.

 4/82  SYSTEM                                                                720

 5/82  SYSTEM                                                                7**

 6/82  SYSTEM                                                                720

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED  THAT NO MAJOR  FGD-RELATED PROBLEMS  WERE  ENCOUNTERED
                         DURING THE SECOND  QUARTER EXCEPT FOR A BROKEN PVC  MAKEUP WATER  PIPELINE
                         THAT FORCED THE  UNIT  OFF-LINE FOR APPROXIMATELY 1  WEEK IN JUNE.   THE
                         FGD AVAILABILITY FOR  THE PERIOD WAS APPROXIMATELY  95/C.

 7/82  SYSTEM                                                                7**

 8/82  SYSTEM                                                                7**

 9/82  SYSTEM                                                                720

 10/82  SYSTEM                                                                7*4

 11/82  SYSTEM                                                                720

 12/82  SYSTEM                                                                74*

 1/83  SYSTEM                                                                 74*

 2/83  SYSTEM                                                                672

 3/83  SYSTEM                                                                 ™*
                                             13-1019

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SIKESTON BRD OF MUNICIPAL UTIL: SIKESTON I  (CONT.)
_.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   X  REMOVAL   PER   BOILER   FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS  FACTOR


       *» PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE  PERIOD  OF  JULY 1982 THROUGH MARCH 1983.

  4/83  SYSTEM                                                                 720

  5/83  SYSTEM                                                                 744

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION MAS UNAVAILABLE FOR THE  MONTHS  OF  APRIL AND MAY,  1983.

  6/83  A            79.4        65.6        65.6         65.6
       B            85.9        81.5        81.5         81.5
       C            79.5        20.1        20.1         20.1
       SYSTEM      100.0        83.6        83.6         83.6                   720   720    602  100.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         OUTAGE  TIME DURING  THE MONTH OF JUNE WAS  DUE IN  PART TO MAINTENANCE AND
                         REPAIR  OF DUCTWORK.

                         A BEARING FAILURE IN  THE SLUDGE SUMP PUMP ALSO CONTRIBUTED TO DOWN TIME
                         DURING  JUNE.

                         THE  ABSORBER  LINER  WAS REPLACED DURING  JUNE FORCING THE FGD SYSTEM
                         OUT  OF  SERVICE.

                         A PLUGGED SUMP DRAIN  SCREEN CAUSED ADDITIONAL  OUTAGE TIME DURING THE
                         MONTH.

  7/83  SYSTEM                                                                 744

  8/83  SYSTEM                                                                 744

  9/83  SYSTEM                                                                 720

       *# PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED  EXPERIENCING SEVERAL SMALL  OUTAGES DURING  THE THIRD
                         QUARTER DUE TO DUCTWORK  LINER  FAILURE AND RELATED  CORROSION.

                         EXPANSION JOINT FAILURES WERE  REPORTED  DURING  THE  PERIOD AT THE MODULE OUT-
                         LET  TO  THE STACK.

                         THE  UTILITY REPORTED  A DRAIN  LINE CORROSION PROBLEM AT  THE BOTTOM OF  THE
                         WET  STACK.

                         THE  FGD SYSTEM WAS  DOWN  FOR 2  WEEKS  DURING  THE THIRD QUARTER TO REPLACE THE
                         LINER ON A SPENT SLURRY  SUMP  PUMP.   A RUBBER LINER WAS  REPLACED WITH
                         URETHANE.

 10/83  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  SYSTEM WAS DOWN FROM OCTOBER 17  TO  OCTOBER 18  DUE TO PROBLEMS WITH THE
                         WET  STACK DRAIN.

 11/83  SYSTEM                                                                 720
                                             13-1020

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SIKESTON BRD OF MUNICIPAL UTIL: SIKESTON 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED A MAJOR OUTAGE FROM OCTOBER 8 TO NOVEMBER 13 FOR
                         REPAIR OF EXPANSION JOINTS IN THE WET STACK DUCTWORK.

12/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED A 4 HOUR OUTAGE ON DECEMBER 25 DUE TO ESP PROBLEMS.
                         THE EXTREME COLD WEATHER CAUSED LOW OIL LEVELS IN THE ESP TRANSFORMERS
                         FORCING THEM TO BE JUMPED.

                         A 4 HOUR OUTAGE OCCURRED ON DECEMBER 14 DUE TO PROBLEMS WITH THE DRIVE
                         LINKAGE ON A DAMPER.

                         ON DECEMBER 26, THE WET STACK DRAIN .FROZE AND BROKE DUE TO EXTREME LOW TEM-
                         PERATURES.

                         THE UTILITY REPORTED PROBLEMS WITH FROZEN AND RUPTURED MIST ELIMINATOR
                         FLANGES ON DECEMBER 26.

                         A BROKEN SHEAR PIN WAS REPORTED ON MODULE B DURING DECEMBER.

  1/84  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGO SYSTEM WAS DOWN FROM DECEMBER 31 1983 TO JANUARY 3 1984 DUE TO OVER
                         HEATED BEARINGS IN A LIMESTONE SILO BIN DISCHARGER.  THE BEARINGS WERE
                         REPLACED AND GREASED.

                         MODULE B WAS NOT AVAILABLE ON JANUARY 20 DUE TO TANKS BEING DRAINED FOL-
                         LOWING CLEANING.

                         MODULE C WAS DOWN SEVEN HOURS ON JANUARY 20 DUE TO VIBRATION PROBLEMS WITH
                         AN ABSORBER MIXER.  VIBRATIONS HAD LOOSENED THE MOUNTING BOLTS.

                         A SEAL WATER LINE ON THE MODULE B SLUDGE PUMP WAS REPLACED AND RE-
                         SUPPORTED DURING A UNIT OUTAGE FROM JANUARY 25 TO 30.

                         A BROKEN CHAIN AND BEARINGS WERE REPLACED ON THE LIMESTONE FEEDER DURING
                         THE FIVE DAY UNIT OUTAGE IN JANUARY.

                         A VENT STACK DRAIN LINE WAS REPLACED WITH A LARGER PVC LINE DURING THE
                         JANUARY UNIT OUTAGE.

  2/84  SYSTEM                                                                696

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         AN EIGHT HOUR OUTAGE WAS REPORTED ON FEBRUARY 8 DUE TO BAD BEARINGS ON  THE
                         LIMESTONE SILO BIN DISCHARGER.  NEW BEARINGS AND GREASE WERE INSTALLED.

  3/84  SYSTEM                                                                744

  4/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         QUENCHER PUMP VIBRATION PROBLEMS WERE REPORTED ON APRIL 30.  ONLY ONE
                         MODULE WAS KEPT IN SERVICE FOR FOUR HOURS.
                                            13-1021

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SIKESTON BRD OF MUNICIPAL UTIL: SIKESTON 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD   CAP.
                                                                S03   PART.  HOURS HOURS  HOURS  FACTOR

                         ON APRIL 30, AN INLET DAMPER SHEAR  PIN AT MODULE A BROKE AND  WAS REPLACED.

 5/84  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         VIBRATION PROBLEMS WERE REPORTED AT THE MODULE C QUENCHER PUMP  ON MAY 15.
                         THE MANUFACTURER SUGGESTED RE-GREASING THE  PUMP MOTOR.   QUENCHER PUMPS ARE
                         NOW BEING INSPECTED REGULARLY.

 6/84  SYSTEM                                                                 720

 7/84  SYSTEM                                                                 744

 8/84  SYSTEM                                                                 744

 9/84  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS DOWN APPROXIMATELY ONE WEEK DURING THE THIRD QUARTER TO
                         REPLACE BEARINGS ON A SLUDGE PUMP.  THE UTILITY HAS MADE MODIFICATIONS TO
                         ALLOW THE REPAIR OF ONE PUMP WITHOUT TAKING THE SCRUBBER DOWN.

                         THE UTILITY REPORTED PROBLEMS WITH  CONTINUOUS EMISSION  MONITORS DURING THE
                         FIRST THREE QUARTERS OF 1984.  THE  FAILURE  OF A COMPUTER COOLING FAN  AND A
                         SHORT IN.A SAMPLING HEAT TRACE LINE WERE THE SPECIFIC PROBLEMS.
                                             13-1022

-------
                                                  UTILITY F60 SURVEY: OCTOBER 1983 - SEPTEMBER 1984
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGO - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAO
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 *» MECHANICAL COLLECTOR
     NUT3ER
     TYPE

 ** FABRIC FILTER
     NUMBER
     TYPE

 »* ESP
     NUMBER
     TYPE
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHECL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*** FGO SYSTEM
SOUTH CAROLINA PUBLIC SERVICE
CROSS
2
CROSS
SOUTH CAROLINA
A
   13.         (  .030 LB/MMBTU)
  258.         (  .600 LB/MMBTU)
******
*****
  450
  450
  495
  450
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
  915.49
  135.0
  183.
CONCRETE
    6.7
               (*****» LB/MMBTU)
(1940000 ACFM)
(  275 F)
t  600 FT)

(  22.0 FT)
COAL
BITUMINOUS
26051.

   16.50
12.0-20.0
    7.50
6.0-10.0
    1.80
1.0-2.3
      .13
******
 0
NONE
 0
NONE
COLD SIDE
   99.0
  0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
(  11200 BTU/LB)
 10800-12000
                                             13-1023

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH CAROLINA PUBLIC SERVICE: CROSS 2 (CONT.)
 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 »* DESIGN AND OPERATING PARAMETERS

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST  ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 «* FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 #* DUCTWORK
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL  TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL  TYPE
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIMESTONE
 PEABODY PROCESS SYSTEMS
 BURNS & ROE
 FULL SCALE
 NEW
'/.   99.83
    85.80
  1
  5/8*
 10/83
  1/80
 NR
 NR
 SPRAY TOWER
 OPEN COUNTERCURRENT SPRAY
 N/A
 NR
 NR
 NR
 NR
 NR
 NR
 NONE
 PRIMARY COLLECTOR
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 NR
 NR
 INDIRECT HOT AIR
 EXTERNAL HEAT EXCHANGER
 STEAM TUBE BUNDLE
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
                                             13-1024

-------
SOUTH CAROLINA PUBLIC SERVICE: CROSS 2 (CONT.)
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 *« PUMPS
     SERVICE
     NA
 ** SOLIDS CONCENTRATING/DEMATERING
     DEVICE

»** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     SITE TREATMENT

 ** WATER BALANCE
     WATER LOOP TYPE
                       MET BALL MILL
                       NR
                       NR
                       NUMBER

                       «*«*


                       NA
                       STABILIZATION
                       NR
                       N/A
                       FINAL
                       LANDFILL
                       NONE
                                                CLOSED
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                       X REMOVAL   PER  BOILER  FGD   CAP.
                                       503  PART. HOURS HOURS  HOURS FACTOR
 10/83  SYSTEM

 11/83  SYSTEM

 12/83  SYSTEM
                                                    744

                                                    720
       ** PROBLEMS/SOLUTIONS/COMMENTS
  1/84  SYSTEM

  2/84  SYSTEM

  3/84  SYSTEM
THE UTILITY REPORTED THAT THE FGD SYSTEM AT CROSS 2 BECAME OPERATIONAL IN
OCTOBER 1933.  COMMERCIAL START-UP IS SCHEDULED FOR MAY 1984.  DURING THE
FOURTH QUARTER, THE SYSTEM WAS IN THE SHAKEDOWN/DEBUGGING PHASE OF OPERA-
TION.

                                                    744

                                                    696

                                                    744
       «* PROBLEMS/SOLUTIONS/COMMENTS
 4/84  SYSTEM

 5/84  SYSTEM
THE UTILITY REPORTED THAT THE FGD SYSTEM WAS STILL IN THE  START  UP  PHASE
OF OPERATION DURING THE FIRST QUARTER OF 1984. CERTIFICATION  TESTING
WAS CONDUCTED AND A LIER SIEGLER IN-LINE MONITOR WAS INSTALLED.

                                                    720

                                                    744
                                             13-1025

-------
UTILITY F6D SURVEY? OCTOBER 1983 - SEPTEMBER 1984

SOUTH CAROLINA PUBLIC SERVICE: CROSS 2 (CONT.)
	,	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD   CAP.
                                                                S02  PART. HOURS  HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         COMMERCIAL OPERATIONS COMMENCED DURING MAY, 1984.

 6/84  SYSTEM                                                                720

 7/84  A           95.6           .0                      .0
       B           99.9        99.8        99.8        99.2
       C           99.9        98.9        99.0        98.3
       SYSTEM     100.0        99.4        99.4        98.7                  744   739    735

 8/84  SYSTEM                                                                740

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY HAS BEEN BURNING SMALL AMOUNTS OF OIL ON START UP AND SHUT
                         DOWN DUE TO FLAME SENSING PROBLEMS. SINCE THE SYSTEM SUPPLIER WILL NOT
                         WARRANTY THE ABSORBER LINER DURING THIS ACTIVITY, THE UTILITY IS OPERATING
                         UNDER THE FOLLOWING STIPULATIONS:
                         (1) BOTH ESP'S WILL BE ON DURING OIL BURNS.
                         (2) OIL BURNING WILL BE MINIMAL TO NONEXISTENT.

                         THE UTILITY REPORTED THAT MECHANICAL PROBLEMS WITH  THE DAMPERS HAVE
                         OCCURRED SINCE START UP.

                         THE UTILITY REPORTED THAT MIST ELIMINATOR PLUGGAGE  HAS BEEN A PROBLEM SINCE
                         COMMERCIAL START UP. THE SYSTEM SUPPLIER IS MODIFYING THE CHEVRON SPACES
                         AND THE WASH SLURRY SYSTEM TO HELP MINIMIZE PLUGGAGE.
                                             13-1026

-------
                                                  UTIUITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
              DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY  NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE  EMISSION LIMITATION - NG/J
S02 EMISSION  LIMITATION - NG/J
NOX EMISSION  LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY M/FGD - MM
NET UNIT GENERATING CAPACITY WO/FGD - MM
EQUIVALENT SCRUBBED CAPACITY - MM

 «* UNIT DATA - BOILER AND STACK
     BOILER  SUPPLIER
     BOILER  TYPE
     BOILER  SERVICE LOAD
     DESIGN  BOILER FLUE GAS FLOM - CU.M/S
     BOILER  FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RAN3E HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - '/.
     RANGE  ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RAN3E  MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE  SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RAN3E  CHLORIDE CONTENT - 7.

 *** PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
     NUM3ER
     TYPE

 ** ESP
     NUMBER
     NUMBER OF SPARES
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 »* PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

 *** FGD SYSTEM
SOUTH CAROLINA PUBLIC SERVICE
MINYAH
2
GEORGETOWN
SOUTH CAROLINA
C
  516.
  301.
  519
  280
  258
  261
BABCOCK ft HILCOX
PULVERIZED COAL
BASE
  384.14       (
               (
               (
                  .100 LB/MMBTU)
                  .200 LB/MMBTU)
                  .700 LB/MMBTU)
  132.2
  122.
CONCRETE
    4.9
                 814030 ACFM)
                 270 F)
                 400 FT)
               ( 16.0 FT)
               ( 11500 BTU/LB)
                ******
COAL
BITUMINOUS
26749.

   14.00
******
********
6.5-7.0
    1.00
******
********
******
 0
NONE
  1
  0
COLD SIDE
RESEARCH-COTTRELL
  384.1         ( 814030  ACFM)
  132.2         (   270  F)
      .1         (   1. IN-H20)
    99.4
  0
 NONE
 N/A
 N/A
 N/A
 N/A
 N/A
 N/A
 N/A
                                             13-1027

-------
UTILITY FED SURVEYS OCTOBER 1983 - SEPTEMBER

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 2 (CONT. )
 ** GENERAL DATA
     SALEABLE PRODUCT/THROMAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN 502 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - 7.
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP

 ** DESIGN AND OPERATING PARAMETERS
     OPER. & MAINT. REQUIREMENT - MANHR/DAY

 ** QUENCHER/PRESATURATOR
     NUMBER
     TYPE
     SUPPLIER
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     LIQUID RECIRCULATION RATE - LITERS/S
     L/G RATIO - L/CU. M
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 *« ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
      LINER GENERIC MATERIAL
      LINER SPECIFIC MATERIAL
      LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
      LIQUID RECIRCULATION RATE - LITER/S
      L/G RATIO -  L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
      SUPERFICAL GAS VELOCITY - M/SEC
      INLET GAS FLOW - CU. M/S
      INLET GAS TEMPERATURE - C
      S02 REMOVAL  EFFICIENCY - X

  ** MIST ELIMINATOR
      PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
      GENERIC TYPE
      SPECIFIC TYPE
      TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
      PRESSURE DROP  - KPA
     CONSTRUCTION MATERIAL GENERIC  TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH FREQUENCY
 THROMAWAY PRODUCT
 MET SCRUBBING
 LIMESTONE
 NONE
 BABCOCK 4 WILCOX
 BURNS & ROE
 FULL SCALE
 NEW
X   99.40
    45.00
     1.1
  1
  7/77
  7/77
    80.0
 VARIABLE THROAT VENTURI
 BABCOCK t WILCOX
   192.06
   135.6
      .7
   369.
     1.9
 CARBON STEEL
 AISI 1110
  407000 ACFM)
   276 F)
  3.0 IN-H20)
  5860 GPM)
  14.4 GAL/1000 ACFM)
  1
  0
 TRAY TOWER
 SIEVE TRAY
 N/A
 BABCOCK & WILCOX
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 NATURAL RUBBER
 BLACK NATURAL RUBBER
 PERFORATED TRAY [TYPE 316L STAINLESS STEEL! ONE
   863.
     5.4
     1.2
     3.2
   159.50
    52.2
    69.0
(13700 GPM)
(  40.5 GAL/1000 ACF)
<  5.0 IN-H20)
(  10.5 FT/S)
(  338000 ACFM)
(   126 F)
 PRIMARY COLLECTOR
  1
  0
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 HORIZONTAL
     2
     3
       .2         ( 1.0 IN-H20)
 ORGANIC
 FIBER-REINFORCED POLYESTER
 BLENDED  I50X RETURN, SOX  FRESH]
 ONCE  PER 2 MINUTES
                                             13-1028

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
SOUTH  CAROLINA PUBLIC SERVICE:  WINYAH 2 (CONT.)

    WASH  RATE -  L/S

 ** REHEATER
    GENERIC  TYPE
    SPECIFIC TYPE
    TRADE NAME/COMMON TYPE
     LOCATION
     PERCENT  GAS  BYPASSED - AVG
     TEMPERATURE  INCREASE - C
     INLET FLUE GAS FLOW RATE - CU. M/S
     INLET FLUE GAS TEMPERATURE - C
     OUTLET FLUE  GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 «* FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE
               (  180 GAL/MIN)
BYPASS
COLD SIDE
N/A
100 FT BELOW INLET OF SCRUBBED GAS BREECHING IN
   50.0
   38.9
  192.07
   52.2
   91.1
     70 F)
   407015 ACFM)
    126 F)
    196 F)
NR
NR
 1
 0
CENTRIFUGAL
WESTINGHOUSE
BOOSTER
FORCED DRAFT
DRY
  192.06
  132.2
CARBON STEEL
 (  407000  ACFM)
 (   270 F)
SHUT-OFF
GUILLOTINE
NR
CARBON STEEL
HIGH STRENGTH LOW ALLOY IHSLA1
NONE
N/A
SHUT-OFF
LOUVER
NR
CARBON STEEL
HIGH STRENGTH LOW ALLOY tHSLAl
ORGANIC
GLASS FLAKE-FILLED POLYESTER
 1
CONTROL
LOUVER
NR
CARBON STEEL
HIGH STRENGTH
NONE
N/A
LOW ALLOY [HSLAJ
SCRUBBER INLET
CARBON STEEL
HIGH STRENGTH LOW ALLOY  tHSLA)
NONE
N/A
SCRUBBER OUTLET TO DAMPER
CARBON STEEL
HIGH STRENGTH LOW ALLOY  IHSLA1
ORGANIC; INORGANIC
GLASS FLAKE-FILLED POLYESTER! HYDRAULICALLY-BOND
                                            13-1029

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH CAROLINA PUBLIC SERVICE: WINYAH Z (CONT.)
 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER
     NUMBER OF SPARES
     PRODUCT QUALITY - X SOLIDS

 ** TANKS
     SERVICE
     VENTURI RECYCLE
     ABSORBER RECYCLE
     SLURRY STORAGE
     RECYCLE WATER
     MILL  PRODUCT SUMP
     GRIT  SEPARATOR

  **  PUMPS
     SERVICE
     VENTLRI RECIRCULATION
     ABSORBER RECIRCULATION
     SLURRY FEED
     MILL  PRODUCT
     RECYCLE WATER

 ***  SLUDGE

  »*  TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

  **  DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE  TRANSPORTATION METHOD
     SITE  TREATMENT
     SITE  DIMENSIONS
     SITE  CAPACITY -  CU.M

  **  WATER  BALANCE
     WATER LOOP TYPE
     MAKEUP WATER ADDITION -  LITERS/S

  **  CHEMICALS AND CONSUMPTION
     FUNCTION
     NAME
     PRINCIPAL CONSTITUENT
     CONSUMPTION
     UTILIZATION - X
     POINT OF ADDITION

  »*  FGO  SPARE CAPACITY  INDICES
     ABSORBER - X
     MIST  ELIMINATOR  -  X
     FAN - X
     BALL  MILL - X
SCRUBBER OUTLET DAMPER TO STACK
CARBON STEEL
HIGH STRENGTH LOW ALLOY IHSLA1
HIGH ALLOY
NICKEL BASE/CHROMIUM-IRON-MOLYBDENUM
WET BALL MILL
COMPARTMENTED
NR
KOPPERS
 1
 0
   35.0
                                                NUMBER
****
***»
****
****
****
***#
NUMBER

   1
   1
****
****
*«««
NONE
N/A
N/A
FINAL
POND
ON-SITE
PIPELINE
NONE
35 ACRES, 12-15 FT
    574810     (    470.0 ACRE-FT)
OPEN
    6.3
               (   100 GPM)
ABSORBENT
LIMESTONE
90X CAC03, 2.5X MGC03
46 TPD
   67.0
BALL MILL
     .0
     .0
     .0
     .0
                                             13-1030

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH  CAROLINA  PUBLIC SERVICE:  WINYAH 2 (CONT.)


 «# F6D SPARE COMPONENT INDICES
     ABSORBER                                         .0
     MIST ELIMINATOR                                 .0
     FAN                                             .0
     BALL MILL                                        .0
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 7/77  SYSTEM                                                                744

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         INITIAL OPERATION OF THE WINYAH 2 FGD SYSTEM TOOK PLACE IN JULY.

 8/77  SYSTEM      90.0                                                      744

 9/77  SYSTEM      90.0                                                      720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGO SYSTEM WAS REPORTEDLY AVAILABLE 90X OF THE AUGUST-SEPTEMBER
                         PERIOD.  SOME MINOR PROBLEMS HAVE BEEN EXPERIENCED WITH THE SOZ AND N02
                         MONITORS.

10/77  SYSTEM     100.0                                                      744

11/77  SYSTEM     100.0                                                      720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE OCTOBER-NOVEMBER PERIOD THE FGD SYSTEM WAS AVAILABLE 100X OF
                         THE TIME.  FREQUENT PLUGGING OF SAMPLE LINES HAS BEEN CAUSING RECURRING
                         INSTRUMENTATION PROBLEMS.

12/77  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         AN ACCEPTANCE TEST WAS RUN IN DECEMBER; HOWEVERi THE RESULTS WERE REJECTED
                         DUE TO IMPROPER SAMPLE COLLECTION AND STORAGE TECHNIQUES.

 1/78  SYSTEM                                                                744

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         IN EARLY JANUARY THE SYSTEM WENT DOWN TO FOR TWO DAYS TO CHECK THE INSTRU-
                         MENTATION.

                         THE S02 MONITORS HAVE AGAIN MALFUNCTIONED.

                         ALL THE SAMPLE LINES HAVE BEEN REPLACED AND NEW HEAT TRACINGS HAVE BEEN
                         INSTALLED AROUND THEM.

 2/78  SYSTEM                                                                672

       *» PROBLEMS/SOLUTIONS/COMMENTS

                          THE FGD SYSTEM WAS BYPASSED FOR SERVERAL DAYS IN FEBRUARY TO ALLOW SYSTEM
                          CLEANING IN PREPARATION FOR TESTING BY BABCOCK AND WILCOX.

 3/78  SYSTEM                                                                744

 4/78  SYSTEM                                                                720

 5/78  SYSTEM                                                                744
                                            13-1031

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 2  (CONT.)
	—PERFORMANCE DATA	•	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS FACTOR
       »* PROBLEMS/SOLUTIONS/COMMENTS
                          SOME MINOR SCALING WAS  ENCOUNTERED  DURING THE  APRIL-MAY PERIOD BUT IT
                          DID NOT CAUSE AN OUTAGE.
 6/78

 7/78
SYSTEM                 100.0

SYSTEM                 100.0

** PROBLEMS/SOLUTIONS/COMMENTS
94.3

97.0
720

744
679

722
679

722
  8/78
                          ONE  SCHEDULED BOILER OUTAGE OCCURRED  IN  JUNE  FOR  THE  INSTALLATION OF A
                          TEST PANEL.  IN JULY,  TWO BOILER OUTAGES OCCURRED.  NO FORCED  FGD
                          OUTAGES WERE REPORTED.

                                                                             744
        SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS

                           THE  UTILITY REPORTED  NO  FORCED  FGD  OUTAGES  DURING AUGUST.

  9/78   SYSTEM                                                                720

        **  PROBLEMS/SOLUTIONS/COMMENTS

                           THE  S02  ANALYZERS  PERFORMED WELL  DURING A TWO WEEK CERTIFICATION TEST
                           THAT TOOK  PLACE  IN SEPTEMBER.
 10/78

 11/78
SYSTEM

SYSTEM

** PROBLEMS/SOLUTIONS/COMMENTS
  .0
                      744

                      720
                                          .0
 12/78
  1/79

  2/79

  3/79
                  THE UNIT WAS DOWN FROM OCTOBER 1 TO NOVEMBER 15 FOR A TURBINE INSPECTION.
                  DURING THIS TIME THE FGD SYSTEM WAS CLEANED AND INSPECTED.

SYSTEM      84.8        82.6        82.6        82.1                  744   740    611  89.3

** PROBLEMS/SOLUTIONS/COMMENTS

                   S02 MONITOR PROBLEMS CONTINUED THROUGH DECEMBER.

                   AN OUTAGE WAS NECESSARY FOR AN ABSORBER PUMP BELT RENEWAL.

                   FEED SLURRY FLOWMETER PROBLEMS WERE ENCOUNTERED DURING DECEMBER.

                   THE LIMESTONE MILL OIL PUMP PROBLEMS TRIPPED THE MILL OFF  LINE A NUMBER
                   OF TIMES IN DECEMBER.

                   A MINOR OUTAGE WAS CAUSED BY PLUGGING OF THE SLURRY DELIVERY LINE.

                   QUENCHER PROBLEMS OCCURRED DURING DECEMBER.

SYSTEM      99.7        99.7        99.7        99.7                  744   744    742  89.3

SYSTEM      96.6        96.3        96.4        92.7                  672   647    623  75.4

SYSTEM      96.5        96.4        96.4        92.7                  744   716    690  75.3
                                             13-1032

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH  CAROLINA  PUBLIC  SERVICE:  WINYAH Z (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         AN OUTAGE MAS REQUIRED TO RENEW QUENCHER PUMP BELTS AND FOR REPAIRS TO A
                         QUENCHER SUCTION VALVE.

                         OUTAGES WERE REQUIRED TO REPAIR A HOLE IN THE FEED SLURRY LINE, TO INSPECT
                         THE MODULE FOR PLUGGING, AND BECAUSE OF A BOOSTER FAN TRIP.

                         THE OPERATING VALUES SHOWN ARE THE FIGURES FOR FEBRUARY AND MARCH COMBINED.

 4/79  SYSTEM      99.4        99.4        99.4        99.4                  720   720    716  67.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE S02 MONITOR HAS PASSED THE STATE CERTIFICA-
                         TION TEST BUT REQUIRES CONTINUING MAINTENANCE TO KEEP IT OPERATING.

                         A MALFUNCTION OF THE RECIRCULATION TANK LEVEL INDICATOR RESULTED IN A LOW
                         LIQUID LEVEL WHICH FORCED THE SCRUBBER OUT OF SERVICE.

 5/79  SYSTEM      98.4        98.7       100.0        95.6                  744   721    711  75.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE S02 MONITOR SAMPLE PUMP REQUIRES MAINTENANCE
                         ALMOST EVERY 24 HOURS.

                         A BOILER OUTAGE ALLOWED TIME FOR CLEANING ABSORBER TRAYS, UNPLUGGING FOUR
                         NOZZLES, CLEANING THE SUMP BOTTOM, AND REPAIRING A SPRAY WASH VALVE.

 6/79  SYSTEM      92.4        92.3        92.1        91.6                  720   716    660  79.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         FOUR OUTAGES IN JUNE WERE DUE TO PLUGGED ABSORBER NOZZLES.  THE PRIMARY
                         CAUSE APPEARED TO BE THAT A SCREEN IN THE ABSORBER SIDE OF THE SUMP BOTTOM
                         WAS LEFT OUT DURING THE PREVIOUS OUTAGE.

                         A HEAVY SCALE BUILD-UP IN THE SUMP BELOW THE VENTURI WAS NOTED.

                         THE UTILITY REPORTED THAT MGO TESTING HAS BEGUN.

 7/79  SYSTEM      98.4        98.4        98.4        97.8                  744   740    727  81.5

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE ABSORBER WAS FORCED OFF-LINE ONCE DURING JULY DUE TO QUENCHER PUMP
                         PACKING PROBLEMS.

                         SOME PLUGGING WAS ENCOUNTERED WITH ONE OF THE ABSORBER NOZZLES.

                         SOME OUTAGE TIME WAS NEEDED TO INSTALL A QUENCHER WALL WASH NOZZLE.

                         TESTS WITH THE ADDITION OF MGO DURING THE MONTH SHOWED IMPROVED S02
                         REMOVAL EFFICIENCIES OF APPROXIMATELY 10X, ALTHOUGH LOW S02 INLET READINGS
                         PREVENTED CONCLUSIVE TEST RESULTS.

 6/79  SYSTEM      99.4        99.0        99.4        98.1                  744    737    730  88.0
                                            13-1033

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 2  (CONT.)
.	_	-—PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A FOUR HOUR OUTAGE RESULTED FROM BOOSTER FAN CONTROL PROBLEMS.

                         A NEW PORT FOR THE SCRUBBER OUTLET  GAS  SAMPLE PROBE HAD TO BE INSTALLED.
                         THIS REQUIRED ONE HOUR OF  SCHEDULED DOWN TIME.

 9/79  SYSTEM                                                                 720

10/79  SYSTEM                                                                 744

11/79  SYSTEM                                                                 720

12/79  SYSTEM                                                                 744

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         NO  INFORMATION WAS AVAILABLE  FOR THIS REPORT PERIOD.

 1/80  SYSTEM                                                                 744

 2/80  SYSTEM                                                                 696

 3/80  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FIRST QUARTER OF 1980 NO MAJOR FGD RELATED PROBLEMS WERE
                         REPORTED.

 4/80  SYSTEM      100.0       100.0       100.0         85.3                   720   614    614 60.2

 5/80  SYSTEM       95.8        94.9        94.9         77.7                   744   609    578 61.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD  SYSTEM WAS OFF LINE THROUGH PART OF  MAY TO WASH DOWN THE ABSORBER
                         MODULES.

 6/80  SYSTEM      100.0       100.0       100.0         99.6                   720   718    718 76.6

       *# PROBLEMS/SOLUTIONS/COMMENTS

                         NUMEROUS LEAKS IN THE FGD  SYSTEM WERE REPAIRED THROUGHOUT THE PERIOD WHILE
                         THE BOILER AND SCRUBBER WERE  IN SERVICE. NO MAJOR OPERATIONAL PROBLEMS
                         WERE REPORTED FOR APRIL, MAY, OR JUNE.

 7/80  SYSTEM      100.0       100.0       100.0        100.0                   744   744    744 75.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO  OPERATIONAL PROBLEMS WERE  REPORTED DURING JULY.

 8/80  SYSTEM       99.7        99.7        99.7         88.3                   744   659    657 74.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE GRIT SEPARATOR  PLUGGED CAUSING  A TWO HOUR OUTAGE.  THE FGD SYSTEM
                         WAS AVAILABLE THROUGH ALL  OF  AUGUST EXCEPT  FOR THIS SHORT OUTAGE.

 9/80  SYSTEM       96.5       100.0       100.0         87.2                   720   629    629 73.4
                                             13-1034

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH CAROLINA  PUBLIC SERVICE:  WINYAH 2 (CONT. )
	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER AND FGD SYSTEM WENT DOWN FOR A SCHEDULED MAINTENANCE OVERHAUL
                         ON SEPTEMBER 30, 1980.  WORK SCHEDULED TO BE DONE INCLUDED INSTALLING A
                         SECOND TRAY IN THE ABSORBER MODULE, RENEWING DEMISTER WASH SYSTEM WITH
                         ALLOY 20 PIPING, AND CLEANING SCALE DEPOSITS FROM QUENCHER THROAT.

10/80  SYSTEM      13.9        94.0        93.4        13.9                  744   111    103  10.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING OCTOBER THE INSTALLATION OF THE ADDITIONAL ABSORBER TRAY AND THE
                         NEW MIST ELIMINATOR WASH SYSTEM WERE COMPLETED.

                         DURING THE SCHEDULED OVERHAUL THE MODULE WAS INSPECTED AND THE RUBBER
                         LINING TESTED.

                         THE MODULE WAS REMOVED FROM SERVICE TO REPACK THE QUENCHER PUMP AND TO
                         INSPECT THE BELTS.

11/80  SYSTEM     100.0       100.0       100.0       100.0                  720   720    720  86.5

12/80  SYSTEM      98.9        98.9        98.9        98.9                  744   744    736  95.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING DECEMBER THE SYSTEM WAS REMOVED FROM SERVICE DUE TO A LIMESTONE
                         FEEDER FAILURE.

                         OUTAGE TIME DURING THE MONTH WAS ALSO CAUSED BY NECESSARY REPAIRS OF THE
                         SEAL WATER LINE TO THE HOLDING TANK PUMPS.

  1/81  SYSTEM      99.1        99.1        99.1        99.1                  744   744    737  92.3

  2/81  SYSTEM      97.0        97.0        97.0        97.0                  672   672    652  88.6

       ** PRCBLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY THE EXPANSION JOINT ON THE QUENCHER DISCHARGE PUMP FAILED
                         CAUSING APPROXIMATELY 20 HOURS OF OUTAGE TIME.

  3/81  SYSTEM     100.0       100.0       100.0       100.0                  744   744    744  70.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR PROBLEMS OTHER THAN THE EXPANSION JOINT
                         FAILURE, OCCURRED DURING THE FIRST QUARTER 1981.

  4/81  SYSTEM                                                                720

  5/81  SYSTEM                                                                744

  6/81  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION FOR THE SECOND QUARTER 1981 IS NOT AVAILABLE  AT  THIS  TIME.

  7/81  SYSTEM      89.4        92.8        96.1        44.2                  744   355     329   33.3
                                            13-1035

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER  1984

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 2  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILEi*  FGD   CAP.
                                                                 502  PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         UNIT 2 WAS OFF THREE TIMES  DURING  JULY  AS A RESULT OF BOILER TUBE LEAKS.

                         THE FGD SYSTEM WAS REMOVED  FROM  SERVICE FOR PART OF THE MONTH TO REPAIR
                         LEAKING NOZZLES ON THE QUENCHER  PUMP.

 8/81  SYSTEM       98.0        98.0        98.0         98.0                  744   744    730  73.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SYSTEM WAS REMOVED FROM SERVICE  ONCE DURING THE MONTH TO REPLACE THE
                         BOOSTER FAN EXPANSION JOINT.

 9/81  SYSTEM       96.0        98.0        95.6         88.3                  720   649    636  62.2

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE MONTH, MAINTENANCE WAS  PERFORMED ON THE QUENCHER SUCTION AMD
                         DISCHARGE  LINES.

 10/81  SYSTEM       31.5        71.0        72.3         30.3                  744   318    226  32.4

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         UNIT WAS SHUT DOWN FOR SCHEDULED MAINTENANCE FROM  OCTOBER 1 THRU OCTOBER
                         21.

                         DURING THE UNIT OUTAGE THE  MODULES WERE TAKEN OUT  OF SERVICE FOR MAINTEN-
                         ANCE WHICH INCLUDED THE  FOLLOWING:
                             REPLACING AND UNPLUGGING  OF  THE  ABSORBER NOZZLES
                             REPAIR LEAKING VENTURI  NOZZLES
                             REPAIR CYCLONE SEPARATOR

 11/81  SYSTEM       82.4        68.2        88.1         81.6                  720   666    588  74.7

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER OUTAGE TIME DURING NOVEMBER WAS  DUE TO A TUBE LEAK.

                         QUENCHER PUMP BELT PROBLEMS WERE ENCOUNTERED.

                         A HOLE IN  THE SLURRY FEED PUMP DISCHARGE LINE CAUSED SOME SYSTEM DOWN TIME.

 12/81  SYSTEM       80.8        81.6        81.1         64.7                  744   589    481  58.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING DECEMBER THE UNIT OUTAGE  TIME WAS FOR ACID  CLEANING.

                         A  LEAK IN  THE DISCHARGE  LINE  OF  THE  ABSORBER PUMP  CAUSED SOME SYSTEM OUTAGE
                         TIME.

                         PROBLEMS WERE ENCOUNTERED WITH THE QUENCHER PUMP NOT STARTING.

 1/82  SYSTEM       49.8        53.0        53.9         49.5                  744   695    369  70.2

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A SEVEN DAY OUTAGE OF  THE  FGD SYSTEM OCCURRED DURING JANUARY DUE TO THE
                         REPAIR OF  A QUENCHER  PUMP.

                         FROZEN WATER  LINES CREATED  PROBLEMS  IN MAKING SLURRY DURING JANUARY.
                                             13-1036

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH CAROLINA PUBLIC SERVICE:  WINYAH 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         A LEAKING CYCLONE SEPARATOR ALSO CREATED PROBLEMS FOR THE FGD SYSTEM DURING
                         JANUARY.

                         THE UNIT WAS DOWN DURING JANUARY DUE TO A BOILER TUBE LEAK.

 2/82  SYSTEM      85.3        85.3        85.3        85.3                  672   672    573  68.7

       «* FROBLEMS/SOLUTIONS/COMMENTS

                         PLUGGED QUENCHER AND VENTURI NOZZLES WERE CLEANED DURING FEBRUARY CAUSING
                         OUTAGE TIME FOR THE FGD SYSTEM.

                         THE REPACKING OF A QUENCHER PUMP CREATED ADDITIONAL DOWN TIME DURING THE
                         MONTH.

                         THE REPAIR OF A HOLE IN THE ABSORBER DISCHARGE LINE ALSO RESULTED IN DOWN
                         TIME DURING THE MONTH.

 3/82  SYSTEM      64.8        64.8        64.8        64.8                  744   744    482  69.4

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE REPAIR OF LEAKS IN A CYCLONE SEPARATOR RESULTED IN OUTAGE TIME FOR THE
                         FGD SYSTEM DURING MARCH.

                         LEAKS WERE ALSO REPAIRED IN THE ABSORBER HEADER AND ABSORBER DISCHARGE
                         LINES CREATING ADDITIONAL OUTAGE TIME.

                         A SIX DAY OUTAGE DURING MARCH WAS THE RESULT OF MAINTENANCE ON AN ABSORBER
                         PUMP THAT DEVELOPED ELECTRICAL PROBLEMS.

 4/82  SYSTEM      74.4        71.2        71.5        65.4                  720   662    471  68.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         ONE SYSTEM OUTAGE DURING APRIL WAS DUE TO A LOSS OF POWER IN A LINE TO THE
                         SYSTEM.

                         THE SYSTEM WAS TAKEN OFF-LINE TWICE DURING THE MONTH DUE TO QUENCHER PUMP
                         PROBLEMS.

                         AN ABSORBER DISCHARGE HEADER LEAK REQUIRED SOME DOWN TIME DURING THE MONTH.

                         ONE OF THE RECYCLE PUMP BEARINGS FAILED AND HAD TO BE REPLACED.

                         THE MODULE DOWNCOMER WAS REPAIRED DURING THE MONTH.

 5/82  SYSTEM      85.3        67.2        67.9        20.5                  744   227    152  21.9

       *« PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF-LINE FOR THREE WEEKS DURING MAY FOR A SCHEDULED OUTAGE.

                         DURING THE MONTH THE SYSTEM WAS SHUT DOWN PART OF THE TIME DUE TO A LOSS
                         OF POWER AND A LEAK IN THE MODULE.

 6/82  SYSTEM      64.0        14.0        14.0        14.0                  720   717    101  71.2

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A LOSS OF A TRANSFORMER WHICH POWERS THE FGD SYSTEM FORCED SOME OUTAGE
                         TIME TO CORRECT THE PROBLEM.

                         THE MILL PRODUCT AND QUENCHER PUMPS WERE REPACKED DURING JUNE.
                                            13-1037

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

SOUTH CAROLINA PUBLIC SERVICE: WINYAH  2  (CONT. )
	_	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR

                         THE  LIMESTONE FEEDER  MALFUNCTIONED  CAUSING SYSTEM DOWN TIME DURING THE
                         MONTH.

  7/82  SYSTEM       94.8         94.8         94.8         94.8                   744   744    706  78.1

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED  THAT  NO  MAJOR  FGD-REUTED PROBLEMS WERE ENCOUNTERED
                         DURING JULYU.

  8/82  SYSTEM       89.5         94.9         97.0         86.8                   744   681    646  61.1

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  FGO SYSTEM  WAS OUT  OF  SERVICE FOR THREE DAYS DURING AUGUST DUE TO
                         MAINTENANCE OF  AN  INDUCED  DRAFT BOOSTER PAN.

  9/82  SYSTEM       53.3         54.5         54.4         53.3                   720   704    383  68.8

       »*  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  CLEANING OF PLUGGED NOZZLES CREATED OUTAGE TIME DURING SEPTEMBER.

                         THE  REPLACEMENT OF ABSORBER AND QUENCHER PUMP SUCTION VALVES ALSO RESULTED
                         IN DOWN TIME DURING THE MONTH.

                         MAINTENANCE OF  QUENCHER AND RECYCLE PUMPS RESULTED IN OUTAGE TIME FOR THE
                         FGD  SYSTEM DURING  SEPTEMBER.

                         MAINTENANCE OF  A MILL PRODUCT TANK  ALSO CONTRIBUTED TO DOWN TIME FOR THE
                         SYSTEM DURING THE  MONTH.

 10/82  SYSTEM       83.4         83.1         83.2         82.9                   744   742    617  77.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         MAINTENANCE OF  MILL PRODUCT AND SLURRY TRANSFER PUMPS RESULTED IN OUTAGE
                         TIME FOR THE FGD SYSTEM DURING OCTOBER.

 11/82  SYSTEM       77.0         77.0         77.0         77.0                   720   720    555  76.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         MAINTENANCE OF  SLURRY TRANSFER AND  QUENCHER PUMPS CREATED DOWN TIME DURING
                         NOVEMBER.

                         MAINTENANCE OF  A CYCLONE SEPARATOR  RESULTED IN OUTAGE TIME DURING THE
                         MONTH.

                         SPENT SLURRY  LINES WERE UNPLUGGED DURING NOVEMBER CAUSING ADDITIONAL OUTAGE
                         TIME FOR THE  FGD SYSTEM.

                         MAINTENANCE OF  A SPENT SLURRY FRESH WATER VALVE CONTRIBUTED TO DOWN TIME
                         DURING THE MONTH.

 12/82  SYSTEM       78.9         79.2         79.2        78.9                   744   742    587  69.6

       #*  PROBLEMS/SOLUTIONS/COMMENTS

                         FGD  SYSTEM OUTAGES DURING DECEMBER  WERE REQUIRED TO UNPLUG SPENT SLURRY
                         LINES.

                         MAINTENANCE OF  QUENCHER, ABSORBER AND MILL PRODUCT PUMPS RESULTED IN DOWN
                         TIME DURING THE MONTH.
                                             13-1038

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER  1984

SOUTH  CAROLINA PUBLIC  SERVICE:  WINYAH Z (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR

                         MAINTENANCE OF AN ABSORBER TANK AGITATOR ALSO CONTRIBUTED TO OUTAGE TIME
                         FOR THE FGD SYSTEM IN DECEMBER.

 1/83  SYSTEM       64.0        56.7        56.7        41.0                  744   537    305  46.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT MAS OUT OF SERVICE FROM JANUARY 3 TO JANUARY 12 FOR A SCHEDULED
                         OUTAGE.

                         A LOSS OF POWER TO THE SCRUBBER OCCURRED DURING THE MONTH CREATING AN FGD
                         SYSTEM OUTAGE.

                         A BROKEN ABSORBER TANK AGITATOR RESULTED IN OUTAGE TIME DURING JANUARY.

                         A LOSS OF SEAL MATER TO ALL PUMPS CONTRIBUTED TO FGD SYSTEM OUTAGES DURING
                         THE MONTH.

 2/83  SYSTEM       58.9        62.0        65.6        43.2                  672   469    291  44.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT HAS OUT OF SERVICE FROM FEBRUARY 2 TO FEBRUARY 4, FEBRUARY 6 TO
                         FEBRUARY 8 AND FEBRUARY 11 TO FEBRUARY 17 FOR SCHEDULED OUTAGES.

                         A BROKEN ABSORBER TANK AGITATOR CAUSED AN FGD SYSTEM OUTAGE DURING
                         FEBRUARY.

                         A SLURRY DISPOSAL LINE BURST CREATED ADDITIONAL OUTAGE TIME FOR THE FGD
                         SYSTEM IN FEBRUARY.

                         MAINTENANCE OF ABSORBER PUMPS RESULTED IN DOWN TIME DURING THE MONTH.

                         MAINTENANCE OF LIMESTONE FEEDERS RESULTED IN AN FGD SYSTEM OUTAGE DURING
                         FEBRUARY.

 3/83  SYSTEM       63.7        74.2        77.1        63.7                  744   639    474  56.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT MAS TAKEN OUT OF SERVICE ON MARCH 27 FOR A TURBINE INSPECTION.

                         MAINTENANCE OF AN ABSORBER PUMP REQUIRED FGD OUTAGE TIME DURING MARCH.

                         MAINTENANCE OF A BALL MILL CLASSIFIER ALSO CONTRIBUTED TO DOWN TIME DURING
                         THE MONTH.

                         MAINTENANCE OF A MODULE OUTLET TEMPERATURE INDICATOR RESULTED IN AN FGD
                         SYSTEM OUTAGE DURING MARCH.

                         A BROKEN ABSORBER TANK AGITATOR CONTRIBUTED TO THE OUTAGE TIME IN MARCH.

 4/83  SYSTEM         .0                                  .0                  720     0      0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS OUT OF SERVICE DURING APRIL DUE TO A TURBINE GENERATOR
                         INSPECTION.  MAINTENANCE ON THE FGD SYSTEM WAS PERFORMED DURING THE UNIT
                         OUTAGE.

 5/83  SYSTEM       59.6        62.0        63.2        59.6                  744   716    444  71.0
                                            13-1039

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER  1984

SOUTH CAROLINA PUBLIC SERVICE: WIKYAH  2  (CONT.)
.-	PERFORMANCE DATA	•	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR


       **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE  TURBINE INSPECTION OUTAGE CONTINUED THROUGH MAY 2, 1983.  THE FGD
                          SYSTEM  OUTAGE  WAS  CONTINUED UNTIL MAY 8 TO COMPLETE MAINTENANCE ON VARIOUS
                          SYSTEM  COMPONENTS.

                          MAINTENANCE WORK WAS PERFORMED ON THE CYCLONE SEPARATOR DURING THE OUTAGE.

                          MAINTENANCE WAS ALSO NEEDED ON RECYCLE PUMPS.

                          SLURRY  LINE FLANGE LEAKS WERE REPAIRED DURING THE OUTAGE IN MAY.

                          A BOOSTER  FAN  REQUIRED MAINTENANCE DURING THE F6D SYSTEM OUTAGE IN MAY.

  6/83 SYSTEM       77.0       76.5        77.0        46.7                  720   439    336  40.6

       *#  PROBLEMS/SOLUTIONS/COMMENTS

                          A QUENCHER PUMP BEARING WAS REPLACED AND THE PUMP REPACKED DURING JUNE.

                          A SCHEDULED UNIT OUTAGE OCCURRED FROM JUNE 7 TO JUNE 18.

                          AN ABSORBER PUMP MOTOR REQUIRED MAINTENANCE DURING THE MONTH OF JUNE.

                          A FORCED UNIT  OUTAGE TOOK PLACE FROM JUNE 27 TO JUNE 29.

                                                                              744   713    674  69.7

                                                                              744   717    703  68.4

                                                                              720   708    685  70.1

       **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE  UTILITY REPORTED THAT HIGH AVAILABILITY DURING THE THIRD QUARTER OF
                          1983 CAN BE ATTRIBUTED TO PERSONNEL CHANGES MADE AT UNITS 2, 3, AND 4. A
                          SEPARATE CREW  HAS  BEEN ASSIGNED TO THE FGD SYSTEM AND CREW MEMBERS ARE MORE
                          CLOSELY SUPERVISED.

 10/83 SYSTEM       86.3       95.7        96.5        66.3                  744   671    642  61.5

       *»  PROBLEMS/SOLUTIONS/COMMENTS

                          THE  FGD SYSTEM WAS OUT OF SERVICE FROM OCTOBER 14 TO OCTOBER 17 TO ALLOW
                          FOR  A CLEANING OF  THE CHEVRON MIST ELIMINATORS.

 11/83 SYSTEM       97.6        91.0        91.2        25.3                  720   200    182  15.3

       **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE  UTILITY REPORTED THAT THE UNIT WAS DOWN FOR SCHEDULED OUTAGES FROM NO-
                          VEMBER  5 TO NOVEMBER 17 AND AGAIN FROM NOVEMBER 21 TO THE END OF THE MONTH.

 12/83 SYSTEM       89.4       84.6        85.0        59.8                  744   527    445  44.7

       **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE  FGD SYSTEM WAS DOWN FROM DECEMBER 25 TO DECEMBER 27 DUE TO FROZEN WATER
                          AND  LIMESTONE  SLURRY LINES.

  1/84 SYSTEM       99.9        99.4        99.9        86.1                  744   645    641  47.3

  2/84 SYSTEM       98.3        98.3        98.3        98.3                  696   696    684  65.2
                                             13-1040
7/83 SYSTEM
8/83 SYSTEM
9/83 SYSTEM
94.4
98.6
97.3
94.5
98.0
96.8
94.3
98.5
97.2
90.6
94.5
95.2

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 198*

SOUTH  CAROLINA  PUBLIC  SERVICE:  WINYAH 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                502  PART. HOURS HOURS  HOURS FACTOR


 3/8*  SYSTEM       99.0        97.3        98.6        69.3                  7**   530    515  46.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS MERE REPORTED DURING THE FIRST QUARTER.

 */8*  SYSTEM                                                                720

 5/8*  SYSTEM                                                                7**

 6/8*  SYSTEM                                                                720

 7/8*  SYSTEM                                                                7**

 8/8*  SYSTEM                                                                7**

 9/8*  SYSTEM                                                                720

       #* PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION HAS UNAVAILABLE  FOR THE SECOND AND THIRD QUARTER OF 198*.
                                             13-10*1

-------
UTILITY FGD SURVEY; OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
SOS EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M
                  .100 LB/MMBTU)
                  .200 LB/MMBTU)
                  .700 LB/MMBTU)
SOUTH CAROLINA PUBLIC SERVICE
WINYAH
3
GEORGETOWN
SOUTH CAROLINA
C
   43.         (
  516.         (
  301.         (
  519
  280
  252
  258
  280
RILEY STOKER
PULVERIZED COAL
BASE
  394.51       ( 836000 ACFM)
  132.2        ( 270 F)
  122.         ( 400 FT)
CONCRETE
                                                *******
               (****» FT)
  **  FUEL  DATA
      FUEL TYPE
      FUEL GRADE
      AVERAGE HEAT  CONTENT - J/G
      RANGE HEAT  CONTENT - BTU/LB
      AVERAGE ASH CONTENT - 7.
      RANGE ASH CONTENT - 7.
      AVERAGE MOISTURE CONTENT  - 7.
      RAK3E MOISTURE  CONTENT -  7.
      AVERAGE SULFUR  CONTENT -  7.
      RAN3E SULFUR  CONTENT - 7.
      AVERAGE CHLORIDE CONTENT  - 7.
      RANGE CHLORIDE  CONTENT -  7.

 **#  PARTICLE CONTROL

  #*  MECHANICAL COLLECTOR
      NUMBER
      TYPE

  **  ESP
      NUMBER
      TYPE
      SUPPLIER
      INLET FLUE  GAS  CAPACITY - CU.M/S
      INLET FLUE  GAS  TEMPERATURE - C
      PARTICLE REMOVAL EFFICENCY - 7.

  **  PARTICLE SCRUBBER
      NUMBER
      GENERIC TYPE
      SPECIFIC TYPE
      TRADE NAME/COMMON NAME
      SHELL GENERIC MATERIAL
      SHELL SPECIFIC  MATERIAL
      LINER GENERIC MATERIAL
      LINER SPECIFIC  MATERIAL
      GAS  CONTACTING  DEVICE TYPE

 ***  FGD SYSTEM

  «*  GENERAL DATA
      SALEABLE PRODUCT/THROWAWAY PRODUCT
      S02  REMOVAL MODE
COAL
BITUMINOUS
26749.         (  11500 BTU/LB)
                ******
   14.00
******
********
6.5-7.0
    1.00
******
********
******
 0
NONE
COLD SIDE
RESEARCH-COTTRELL
  394.5        ( 836000 ACFM)
  132.2        (  270 F)
   99.3
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
THROWAWAY PRODUCT
WET SCRUBBING
                                             13-1042

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
SOUTH CAROLINA PUBLIC SERVICE:  WINYAH 3 (CONT.)

    PROCESS TYPE
    PROCESS ADDITIVES
    SYSTEM SUPPLIER
    A-E  FIRM
    DEVELOPMENT LEVEL
    NEW/RETROFIT
    UNIT DESIGN PARTICLE REMOVAL EFFICIENCY - X
    UNIT DESIGN SOS REMOVAL EFFICIENCY - X
    ENERGY CONSUMPTION - X
    CURRENT STATUS
    COMMERCIAL START-UP
    INITIAL START-UP
    CONTRACT AWARDED

 *« DESIGN AND OPERATING PARAMETERS
    OPER. t MAINT. REQUIREMENT - MANHR/DAY

 »» QUENCHER/PRESATURATOR
    NUMBER
     TYPE
     SUPPLIER
     INLET GAS  FLOW -  CU. M/S
     INLET GAS TEMPERATURE - C
     LIQUID  RECIRCULATION RATE - LITERS/S
     L/G RATIO  -  L/CU.  M
     CONSTRUCTION  MATERIAL GENERIC TYPE
     CONSTRUCTION  MATERIAL SPECIFIC TYPE
 *« ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     S'UMBER OF CONTACTING ZONES
     L/G RATIO - L/CU.M
     SUPERFICAL GAS VELOCITY - M/SEC
     S02 REMOVAL EFFICIENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH FREQUENCY
     WASH RATE - L/S

 ** REHEATER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
LIMESTONE
NONE
BABCOCK ft WILCOX
BURNS t ROE
FULL SCALE
NEW
   99.30
   90.00
    Z.I
 1
 7/80
 7/80
11/78
   80.0
VARIABLE THROAT VENTURI
BABCOCK t
  394.51
  132.2
  781.
    2.0
CARBON STEEL
AISI 1110
WILCOX
     ( 836000 ACFM)
     (  270 F)
     (12400 GPM)
     ( 14.8 GAL/1000 ACFM)
 2
 0
TRAY TOWER
SIEVE TRAY
N/A
BABCOCK t WILCOX
CARBON STEEL
AISI 1110
N/A
ORGANIC
NATURAL RUBBER
BLACK NATURAL RUBBER
PERFORATED TRAY
 2
    6.5        ( 48.9 GAL/1000 ACF)
    3.2        ( 10.5 FT/S)
   90.0
PRIMARY COLLECTOR
 2
 0
 1
IMPINGEMENT
BAFFLE
CLOSED VANE
HORIZONTAL
    2
    3
     .2
ORGANIC
FIBER-REINFORCED POLYESTER
BLENDED (50X RETURN. SOX FRESH]
ONCE PER 2 MINUTES
   11.4        (  180 GAL/MIN)
     ( 1.0 IN-H20)
 1
 0
INDIRECT HOT AIR
EXTERNAL HEAT EXCHANGER
STEAM TUBE BUNDLE
                                            13-1043

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1964
SOUTH CAROLINA PUBLIC SERVICE: WINYAH 3 (CONT.)

     LOCATION
     PERCENT GAS BYPASSED - AVG
     TEMPERATURE INCREASE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 *» FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
  **  DAMPERS
      GENERIC  TYPE
      SPECIFIC TYPE
      CONSTRUCTION MATERIAL GENERIC TYPE
      CONSTRUCTION MATERIAL SPECIFIC TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC  MATERIAL TYPE

  **  DUCTWORK
      LOCATION
       SHELL GENERIC  MATERIAL TYPE
       SHELL SPECIFIC MATERIAL  TYPE
       LINER GENERIC  MATERIAL TYPE
       LINER SPECIFIC MATERIAL  TYPE

  **  DUCTWORK
      LOCATION
       SHELL GENERIC  MATERIAL TYPE
       SHELL SPECIFIC MATERIAL  TYPE
       LINER GENERIC  MATERIAL TYPE
       LINER SPECIFIC MATERIAL  TYPE

  **  DUCTWORK
      LOCATION
       SHELL GENERIC  MATERIAL TYPE
       SHELL SPECIFIC MATERIAL  TYPE
       LINER GENERIC  MATERIAL TYPE
       LINER SPECIFIC MATERIAL  TYPE

  *«  DUCTWORK
      LOCATION
       SHELL GENERIC  MATERIAL TYPE
       SHELL SPECIFIC MATERIAL  TYPE
       LINER GENERIC  MATERIAL TYPE
       LINER SPECIFIC MATERIAL  TYPE

  **  REAGENT PREPARATION EQUIPMENT
      FUNCTION
      DEVICE
      DEVICE TYPE
      MANUFACTURER
      NUMSER
      NUMBER OF SPARES
      FULL LOAD DRY FEED CAPACITY - M.TONS/HR
      PRODUCT  QUALITY -  X SOLIDS
EXTERNAL
     .0
   16.7
CARBON STEEL;
AISI 1110
 z
 0
CENTRIFUGAL
BOOSTER
FORCED DRAFT
DRY
  132.2
CARBON STEEL
 (   30 F)
COPPER IFINS3
 (  270 F)
LOUVER
NR
CARBON STEEL
HIGH STRENGTH LOW ALLOY IHSLA1
NONE
N/A
LOUVER
NR
CARBON STEEL
AISI 1110
ORGANIC
INERT FLAKE-FILLED VINYL ESTER
INLET
CARBON STEEL
HIGH STRENGTH LOW ALLOY IHSLAJ
NONE
N/A
OUTLET
CARBON STEEL
AISI 1110
ORGANIC
INERT FLAKE-FILLED VINYL ESTER
BYPASS
CARBON STEEL
HIGH STRENGTH LOW ALLOY tHSLA)
NONE
N/A
REHEAT
CARBON STEEL
AISI 1110
NONE
N/A
WET BALL MILL
COMPARTMENTED
NR
KOPPERS
 2
 0
    3.6        (   
-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
SOUTH CAROLINA  PUBLIC SERVICE:  MINYAH 3 (CONT.)
tut TANKS
    SERVICE

    QUENCHER RECIRCULATION
    ABSORBER RECYCLE
    SLURRY TRANSFER
    RECYCLE WATER
    MILL PRODUCT
    MIST ELIMINATOR WASH

*» PUMPS
    SERVICE
     QUENCHER RECIRCULATION
     ABSORBER RECIRCULATION
     SLURRY FEED
     MILL PRODUCT
     RECYCLE WATER
     THICKENER UNDERFLOW
     THICKENER SUMP

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     CONFIGURATION
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

*** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT
     SITE SERVICE LIFE - YRS

 ** WATER BALANCE
     WATER LOOP TYPE

 ** CHEMICALS AND CONSUMPTION
     FUNCTION
     NAME
     CONSUMPTION
     POINT OF ADDITION

 ** FGO SPARE CAPACITY INDICES
     ABSORBER - X
     MIST ELIMINATOR - X
     FAN - X
     BALL MILL - X

 ** FGD SPARE COMPONENT INDICES
     ABSORBER
     MIST ELIMINATOR
                                                NUMBER

                                                **M*
                                                »***
                                                «***
                                                ****
                                                **«*
                                                **«*
                                               NUMBER

                                               ****
                                               ****
                                               ****
                                               «***
                                               ****
                                               K***
                                               ****
                                               THICKENER
                                                Z
                                               CIRCULAR
                                               CARBON STEEL
                                               AISI 1110
                                               ORGANIC
                                               GLASS FLAKE-FILLED POLYESTER
                                               ABSORBER BLEED
                                               13X SOLIDS
                                               35X SOLIDS
                                               TO POND
                                               TO CLARIFIED RECYCLE TANK
                                               THICKENED
                                               N/A
                                               N/A
                                               FINAL
                                               POND
                                               ON-SITE
                                               PIPELINE
                                               NONE
                                                15
                                               CLOSED
                                               ABSORBENT
                                               LIMESTONE
                                               4 TPH  18 TPH DESIGN VALUE]
                                               BALL MILL
                                                     .0
                                                     .0
                                                     .0
                                                     .0
                                                     .0
                                                     .0
                                            13-1045

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH CAROLINA PUBLIC SERVICE: WINYAH  3  (CONT.)

     FAN
     BALL MILL
                                              .0
                                              .0
...	,	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS FACTOR
 6/80  SYSTEM      60.0        60.0         60.0         46.6

       **  PROBLEMS/SOLUTIONS/COMMENTS

                          INITIAL  FGD OPERATIONS  BEGAN JUNE 3,  1980.
                                                                              720   559
                                                                                   336  59.5
  7/80
  8/80
  9/80
 10/80
                          THE  INLET  DAMPER  LOCKED  UP  FORCING THE  FGD SYSTEM OUT OF SERVICE FOR  PART
                          OF JUNE.

                          THERE  HAVE BEEN CONTINUING  PROBLEMS WITH  THE THICKENER SUMP RESULTING FROM
                          IT'S LOCATION.  THESE  PROBLEMS  FORCED THE FGD SYSTEM OUT OF SERVICE FOR
                          APPROXIMATELY  7 DAYS.
        A
        B
        SYSTEM
            12.8
            12.8
            12.8
            12.8
            12.8
            12.8
            12.8
            12.8
            12.8
12.8
12.8
12.8
                                                                      744   744     95  79.8

** PROBLEMS/SOLUTIONS/COMMENTS

                  THE THICKNER RAKE DRIVE MECHANISM WAS REPAIRED DURING JULY.

                  THE LARGE BELT DRIVEN PUMP HAS BEGUN TO SHOW SIGNS OF RAPID WEAR.

                  THE FGD SYSTEM WAS OUT OF SERVICE BECAUSE OF COMPUTER LOGIC PROBLEMS CAUSED
                  BY A BAD CABLE.

                  THE THICKNER SUMP PUMP AND MIXER MOTORS WERE FLOODED OUT CAUSING THE FGD
                  SYSTEM TO GO DOWN.
        A
        B
        SYSTEM
            18.0
            18.0
            18.0
            20.4
            20.4
            20.4
            20.4
            20.4
            20.4
18.0
18.0
18.0
                                                                              744   658
                                                                                           134  79.4
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE THICKNER SUMP PUMP AND MIXER MOTORS CONTINUED TO HAVE PROBLEMS BECAUSE
                          OF THE FLOODING LAST MONTH.

                          THE SCRUBBER OUTLET DAMPER WOULD NOT CLOSE PROPERLY WHICH REQUIRED WORK
                          DURING AUGUST.

                          THE ABSORBER TRAY STRAP WAS BROKEN IN SEVERAL AREAS AND REQUIRED REPAIR
                          WORK DURING THE MONTH.
        A
        B
        SYSTEM
              .0
              .0
              .0
              .0
              .0
              .0
              .0
              .0
              .0
  .0
  .0
  .0
                                                                              720   647
                                                                                             0  84.6
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE FGD SYSTEM WAS OUT OF SERVICE THROUGH ALL OF SEPTEMBER BECAUSE OF
                          REPAIRS BEING MADE ON THE THICKNER.
A
B
SYSTEM
89.2
97.2
92.4
87.0
95.0
91.0
                                            87.0
                                            95.0
                                            91.0
86.0
94.0
90.0
                                                          744   736    670  89.7
                                             13-1046

-------
                                                  UTILITY F6D SURVEY:  OCTOBER 1983 - SEPTEMBER 1984

SOUTH  CAROLINA  PUBLIC  SERVICE:  HINYAH 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING OCTOBER SOME OF THE FGD SYSTEM OUTAGE TIME  WAS DUE TO PLUGGING OF
                         THE THICKENER UNDERFLOW LINE.

                         THE THICKENER RAKE DRIVE MECHANISM WAS REPAIRED DURING OCTOBER.

                         SOME OUTAGE TIME DURING THE MONTH WAS CAUSED BY THE REPLACEMENT OF THE
                         BROKEN BELTS ON THE QUENCHER PUMP.

                         THE UNIT EXPERIENCED FOUR TRIPS DURING THE MONTH OF OCTOBER.

11/80  A           72.5        72.7        72.7        72.5
       B           73.2        73.4        73.4        73.2
       SYSTEM      72.8        73.1        73.1        72.8                  720   718    524  90.2

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING NOVEMBER REPAIRS WERE MADE TO THE QUENCHER  DISCHARGE LINE, ABSORBER
                         PUMP BELTS AND QUENCHER HEADER CAUSING THE FGD SYSTEM TO BE DOWN.  OUTAGE
                         TIME WAS ALSO NEEDED TO UNPLUG THE QUENCHER NOZZLES.

                         THE FGO SYSTEM WAS OUT OF SERVICE FOR APPROXIMATELY SIX DAYS DUE TO COMPU-
                         TER LOGIC PROBLEMS WHICH WERE CAUSED BY A FAULTY LOGIC CARD HOLDER.

12/80  A           95.7        97.6        97.6        95.7
       B           94.9        96.8        96.8        94.9
       SYSTEM      95.3        97.2        97.2        95.3                  744   730    709  89.5

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING DECEMBER OUTAGE TIME WAS NECESSARY FOR REPAIRS TO THE MODULE B
                         QUENCHER PUMP DISCHARGE VALVE.

  1/81  A           62.4        75.5        75".5        62.4
       B           69.2        83.7        83.7        69.2
       SYSTEM      65.9        79.7        79.7        65.9                  744   615    490  69.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY PROBLEMS WITH THE BALL MILL WERE ENCOUNTERED CAUSING THE
                         SYSTEM TO SHUT DOWN.

  2/81  A           83.8        85.2        85.2        80.2
       B           88.1        89.8        89.8        84.5
       SYSTEM      86.0        87.6        87.6        82.4                  672   633    554  79.2

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY COMPUTER PROBLEMS CAUSED THE THICKENER SUMP TO FLOOD.

                         THE INLET DAMPER CAUSED PROBLEMS DURING THE MONTH.

  3/81  A           84.9       100.0       100.0        80.9
       B           84.9       100.0       100.0        80.9
       SYSTEM      84.9       100.0       100.0        60.9                  744   602    602  69.4

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SYSTEM WAS SHUT DOWN ON MARCH 27 DUE TO A  SCHEDULED  UNIT  OUTAGE.

  4/81  SYSTEM                                                                720

  5/81  SYSTEM                                                                7
-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 3  (CONT.)
____.	PERFORMANCE  DATA	•	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS  HOURS  HOURS FACTOR
 6/81  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION FOR THE SECOND QUARTER  1981  IS NOT AVAILABLE AT THIS TIME.
 7/81
  8/81
  9/81
 10/81
 11/81
 12/81
A
B
SYSTEM
                   86.2
                   90.6
            83.5
            81.3
            82.5
            85.3
            83.1
            84.2
82.8
80.6
81.8
                                                                              744   738
                                                                                           608 75.6
       «*  PROBLEMS/SOLUTIONS/COMMENTS

                         THE WINYAH  3 BOILER TRIPPED  OFF  TWICE  DURING THE MONTH.

                         THE QUENCHER PUMPS TRIPPED ONCE  DURING THE MONTH ON THE  "A" MODULE AS A
                         RESULT  OF WATER  SEEPING  INTO THE SWITCHING APPARATUS.
A
B
SYSTEM
                    81.3
                    81.9
                    81.6
            80.5
            88.2
            84.3
            78.2
            85.8
            82.0
67.2
73.7
70.4
                                                                              744   621
                                                                                           524 43.2
        #*  PROBLEMS/SOLUTIONS/COMMENTS
                          MISCELLANEOUS  OUTAGES  DURING THE  MONTH  INCLUDED MAINTENANCE REQUIRED
                          ON  THE  "A"  QUENCHER  PUMP AND FLOODING OF THE THICKENER UNDERFLOW
                          SUMP.
A
B
SYSTEM
                    97.2
                    98.8
                    98.0
            95.3
            96.9
            96.0
            97.0
            98.6
            97.7
85.1
86.5
85.8
                                                                              720   643
                                                                                   618  50.1
        ** PROBLEMS/SOLUTIONS/COMHENTS
                          ONE  OUTAGE  WAS REQUIRED  DURING THE MONTH AS A RESULT OF THE INABILITY TO
                          START THE BALL MILLS.

                          THERE WERE  FOUR UNIT OUTAGES DURING THE MONTH AS A RESULT OF OPACITY AND
                          PRECIPITATOR PROBLEMS.
        A
        B
        SYSTEM
            95.5
            95.6
            95.6
            95.7
            95.8
            95.7
            97.0
            97.1
            97.0
95.5
95.6
95.6
                                                                              744   742
                                                                                           711  78.2
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          DURING OCTOBER THE SPRAY NOZZLES AND MODULES INTERNALS WERE CLEANED.   THIS
                          WAS DONE SO THAT TESTS COULD BE PERFORMED.
A
B
SYSTEM
98.1
94.4
96.3
                                96.2
                                92.0
                                94.0
            97.0
            92.7
            94.8
85.8
82.0
83.9
                                                                              720   642    604  70.8

        **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE UNIT WAS DOWN PART OF NOVEMBER DUE TO A TUBE LEAK.

                          MODULE B WAS SHUT DOWN ABOUT 40 HOURS DUE TO ABSORBER PUMP MAINTENANCE.
A
B
SYSTEM
96.7
97.5
97.1
96.7
97.5
97.1
                                            96.7
                                            97.5
                                            97.1
96.7
97.5
97.1
                                                                              744   744
723  77.6
                                             13-1048

-------
                                                  UTILITY  F6D  SURVEY:  OCTOBER  1983  -  SEPTEMBER 1984

SOUTH  CAROLINA PUBLIC SERVICE:  WINYAH  3  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE  AVAILABILITY  OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD   CAP.
                                                                SOS   PART.  HOURS  HOURS   HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING DECEMBER MODULE A MAS  TAKEN OFF-LINE  PART OF THE  TIME DUE TO
                         ABSORBER PUMP  MAINTENANCE.

 1/82  A           84.7        86.0        86.1        64.7
       B           81.4        82.5        82.6        81.4
       SYSTEM       83.1        84.3        84.3        83.1                  744    734    618  69.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER DOWN TIME DURING JANUARY WAS TO REPAIR  THE MODULE B  FD  FAN.

                         BOTH MODULES WERE  TAKEN OUT OF SERVICE PART  OF  THE MONTH FOR ESP MAINTEN-
                         ANCE.

                         MODULE B OUTLET DAMPERS MALFUNCTIONED CAUSING ADDITIONAL OUTAGE TIME.

                         THE MILL PRODUCT DISCHARGE LINE TO THE CLASSIFIERS INLET VALVE  FROZE
                         CAUSING ADDITIONAL DOWN TIME.

 2/82  A           43.8        54.6        55.0        43.8
       B           62.1        77.4        77.9        62.1
       SYSTEM       52.9        66.0        66.4        52.9                  672    539    356  46.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN  FOR FIVE DAYS IN FEBRUARY  TO  WORK ON THE ID FAN  DAMPERS.

                         BOTH MODULES WERE  OFF-LINE PART OF THE TIME  TO  CLEAN THE SPRAY  NOZZLES.

                         BOTH MODULES EXPERIENCED INLET DAMPER PROBLEMS.

                         SOME MINOR PROBLEMS EXPERIENCED DURING THE MONTH INCLUDED THE SUMP DRAINS
                         PLUGGING AND A DOWNCOMER LEAK.

 3/82  A           82.9        82.9        82.9        82.9
       B           87.7        87.7        87.7        87.7
       SYSTEM       85.3        85.3        85.3        85.3                  744    744    635  67.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MOST OF THE OUTAGE TIME DURING MARCH WAS TO  CLEAN  THE  PLUGGED SPRAY
                         NOZZLES.

                         THE DOKNCOMERS ON BOTH MODULES HAD TO BE PATCHED DURING  THE MONTH.

                         ADDITIONAL OUTAGE  TIME DURING MARCH WAS NECESSARY  TO REPACK THE PUMPS.

                         PROBLEMS WERE ENCOUNTERED WITH OPENING THE  INLET AND OUTLET DAMPERS  DURING
                         THE MONTH.

 4/82  A           22.2        74.4        68.3        22.2
       B           25.9        86.7        79.7        25.9
       SYSTEM       24.1        80.6        74.0        24.1                  720    215    173  19.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS SHUT DOWN FOR THREE WEEKS IN APRIL FOR A SCHEDULED OUTAGE.

                         DURING THE MONTH THE MODULE WAS DOWN PART OF THE TIME TO TIGHTEN AND
                         CLEAN THE SPRAY NOZZLES.
                                            13-1049

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER  1984

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 3  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS FACTOR

                         GENERAL MAINTENANCE MAS  PERFORMED ON THE MIST ELIMINATOR DURING THE MONTH.

 5/82  A           87.8        90.0         90.3         88.9
       B           88.5        91.3         91.7         90.3
       SYSTEM      88.1        90.7         91.0         89.6                  744   736    667  79.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MAY  PROBLEMS WERE ENCOUNTERED WITH THE DAMPERS.

                         THE  SPRAY NOZZLES  PLUGGED  FORCING THE MODULES OFF-LINE FOR CLEANING.

 6/82  A           75.8        78.0       100.0         74.8
       B           88.8        91.6       100.0         87.8
       SYSTEM      82.3        84.8       100.0         81.3                  720   690    585  72.6

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         DAMPER PROBLEMS  EXPERIENCED IN MAY CONTINUED THROUGHOUT JUNE.

                         DURING JUNE THE  RECYCLE  TANK  AND  THE A MODULE THICKENER TANK WERE CLEANED.

                         SOME OF THE PUMPS  WERE REPACKED DURING THE MONTH CAUSING ADDITIONAL SYSTEM
                         DOWN TIME.

                         ADDITIONAL  SYSTEM  OUTAGES  INCLUDED FAILURE OF THE WESTINGHOUSE LOGIC,
                         SWITCHING PUMPS  AND POWER  OFF DUE TO RAPPING.

 7/82  A           94.9        85.9         87.9         85.5
       B           100.0        97.7       100.0         97.3
       SYSTEM      97.5        91.8         93.9         91.4                  744   741    680  80.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED  THAT  NO  MAJOR FGD-REUTED PROBLEMS WERE ENCOUNTERED
                         DURING JULY.

 8/82  A           94.7        94.1         94.5         91.1
       B           74.4        73.1         73.4         70.8
       SYSTEM      84.5        83.6         83.9         81.0                  744   720    603  76.4

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         MAINTENANCE OF ABSORBER  AND QUENCHER PUMPS RESULTED IN DOWN TIME FOR THE
                         FGD  SYSTEM  DURING  AUGUST.

                         OUTAGE TIME WAS  ALSO  ATTRIBUTED TO MAINTENANCE OF A RECYCLE TANK LEVEL
                         TRANSMITTER.

                         PATCHING OF A VENTURI LEAK RESULTED IN DOWN TIME DURING AUGUST.

                         A CLEANING  OF THE  QUENCHER NOZZLES ALSO CONTRIBUTED TO OUTAGE TIME DURING
                         THE  MONTH.

                         THE  PURGING OF WATER  FROM  A CONTROL AIR SYSTEM RESULTED IN DOWN TIME FOR
                         THE  FGD SYSTEM DURING AUGUST.

 9/82  A           72.5        80.3         80.3         72.4
       B           76.6        84.6         84.7         76.4
       SYSTEM      74.6        82.4         82.5         74.4                  720   650    536  67.5
                                             13-1050

-------
                                                  UTILITY F60 SURVEY:  OCTOBER 1983 - SEPTEMBER 198*

SOUTH  CAROLINA PUBLIC SERVICE:  WINYAH  3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FED   CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE PATCHING OF LEAKS IN A QUENCHER WALL RESULTED  IN DOWN TIME DURING
                         SEPTEMBER.

                         REPAIR OF LEAKS IN THE MILL PRODUCT PUMPS ALSO CAUSED OUTAGE TIME  DURING
                         THE MONTH.

                         MALL WASH HEADER LEAK REPAIRS RESULTED IN DOWN TIME DURING SEPTEMBER.

                         THE CLEANING OF PLUGGED NOZZLES CREATED OUTAGE TIME DURING THE MONTH.

                         SCRUBBER OUTAGES WERE ALSO ATTRIBUTED TO THE CLEANING OF PLUGGED SLURRY
                         SUPPLY LINES.

                         THE MAINTENANCE OF ABSORBER AND QUENCHER PUMPS LED TO DOWN TIME FOR THE FGD
                         SYSTEM DURING SEPTEMBER.

                         MAINTENANCE OF AN INLET DAMPER DRIVE RESULTED IN DOWN TIME DURING  THE
                         MONTH.

                         SPENT SLURRY VALVE REPAIRS CREATED OUTAGE TIME FOR THE FGD SYSTEM  DURING
                         SEPTEMBER.

10/82  A           94.6        94.3        94.5        94.3
       B           92.8        93.8        94.0        93.8
       SYSTEM      93.7        94.0        94.2        94.1                  744   744   700  78.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         QUENCHER LEAK REPAIRS RESULTED IN DOWN TIME DURING OCTOBER.

                         MAINTENANCE OF ABSORBER PUMPS LED TO OUTAGE TIME DURING THE MONTH.

11/82  A           99.1        99.3        99.5        99.1
       B           87.7        87.8        88.1        87.7
       SYSTEM      93.4        93.5        93.8        93.4                  720   719   672  74.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         OUTAGES WERE ATTRIBUTED TO MAINTENANCE OF ABSORBER PUMPS DURING NOVEMBER.

                         QUENCHER HEADER REPAIRS LED TO FGD SYSTEM DOWN TIME DURING THE MONTH.

12/82  A           93.4        91.8        93.5        77.2
       B           58.6        65.9        67.1        55.4
       SYSTEM      76.0        78.9        80.3        66.3                  744   625    493  49.4

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         MAINTENANCE OF A THICKENER CONE LEAK RESULTED IN OUTAGE TIME DURING
                         DECEMBER.

                         ABSORBER PUMP REPAIRS LED TO FGO SYSTEM OUTAGES DURING THE MONTH.

                         MAINTENANCE OF MODULE LEAKS RESULTED IN DOWN TIME DURING DECEMBER.

                         THE UNIT WAS OUT OF SERVICE FROM DECEMBER 2 TO DECEMBER 6  FOR  A SCHEDULED
                         OUTAGE.

 1/83  A           67.0        57.3        57.3        44.3
       B           96.0        94.8        94.8        73.3
       SYSTEM      81.5        76.0        76.0        58.8                  744    575     437   43.1
                                            13-1051

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 3  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OUT OF SERVICE FROM JANUARY 23 TO JANUARY 31 FOR A SCHEDULED
                         OUTAGE.

                         MAINTENANCE OF VENTURI  LEAKS  CONTRIBUTED TO THE OUTAGES DURINO JANUARY.

                         MAINTENANCE OF ABSORBER AND QUENCHER  PUMPS RESULTED IN OUTAGE TIME  DURING
                         THE MONTH.

                         OUTAGES WERE ALSO THE RESULT  OF REMOVAL OF FLYASH  FROM THE SLURRY RECYCLE
                         TANKS.

                         THE UNPLUGGING OF QUENCHER NOZZLES  RESULTED IN FGD SYSTEM OUTAGES DURING
                         JANUARY.

  2/83  A           85.9        80.1        81.0         73.1
       B           89.5        91.8        93.1         83.7
       SYSTEM      87.7        86.0        87.1         78.4                   672   613    527  53.5

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN FROM  FEBRUARY 17  TO FEBRUARY 18  FOR A SCHEDULED OUTAGE.

                         MAINTENANCE OF AN ABSORBER PUMP DISCHARGE VALVE RESULTED IN OUTAGE  TIME
                         DURING THE MONTH.

                         OUTAGE TIME WAS ALSO THE RESULT OF  UNPLUGGING QUENCHER NOZZLES.

                         A TRIPPED PROGRAMMABLE  LOGIC  CONTROLLER LED TO AN  FGD SYSTEM OUTAGE DURING
                         FEBRUARY.

                         MAINTENANCE OF A QUENCHER  PUMP RESULTED IN DOWN TIME DURING THE MONTH.

                         THE REPAIR OF A LOW PRESSURE  WATER  LINE LEAK PRODUCED AN FGD SYSTEM OUTAGE
                         DURING FEBRUARY.

  3/83  A           22.6        83.0        83.0         14.4
       B           21.4        30.3        30.3         5.3
       SYSTEM      22.0        56.6        56.6         9.8                   744   129    73  9.4

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OUT OF SERVICE FROM MARCH 1 TO MARCH  24 FOR A BOILER
                         INSPECTION.

                         THE UNIT WAS DOWN FROM  MARCH  28 TO  MARCH 31 FOR A  SCHEDULED OUTAGE.

                         MODULE B WAS TAKEN OUT  OF  SERVICE TO  DRAIN THE FLYASH CONTAMINATED  SLURRY
                         FROM  THE RECYCLE TANK.

  4/83  A           89.9        88.8        89.3         87.6
       B           96.7        95.8        96.3         94.4
       SYSTEM      93.3        92.3        92.8         91.0                   720   710    655  59.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT  NO  MAJOR  FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING APRIL.

  5/83  A           26.2        62.6        65.8         26.2
       B           30.2        71.9        75.7         30.2
       SYSTEM      28.2        67.2        70.8         28.2                   744   312    210  24.6
                                             13-1052

-------
                                                  UTILITY F6D  SURVEY:  OCTOBER  1983 -  SEPTEMBER  1984

SOUTH CAROLINA PUBLIC SERVICE: MINYAH  3  (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY. UTILIZATION  7. REMOVAL   PER   BOILER   FGD    CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR


      **  PROBLEMS/SOLUTIONS/COMMENTS

                         SCHEDULED  UNIT OUTAGES OCCURRED FROM MAY 6 TO MAY  9 AND AGAIN FROM MAY 11
                         TO  MAY 27.

                         RECYCLE PUMPS WERE REPAIRED DURING THE PERIOD OF MAY 5  TO MAY 27.

                         SEVERAL FGD SYSTEM OUTAGES TOOK PLACE DURING MAY DUE TO MAINTENANCE  OF
                         ESP'S.

                         MAINTENANCE WORK WAS NEEDED ON A SPENT SLURRY VALVE DURING THE  MONTH.

 6/83  A           92.2        82.3        87.1        58.6
       B           95.3        86.8        91.9        61.8
       SYSTEM      93.7        84.5        69.5        60.2                  720   513   433  42.2

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE  ENCOUNTERED
                         DURING JUNE.
                                                                             744   712     677   60.9
                                                                             744   558    516  53.1



                                                                             720   690    680  61.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT HIGH AVAILABILITY DURING THE THIRD QUARTER  OF
                         1983 CAN BE ATTRIBUTED TO PERSONNEL CHANGES MADE AT UNITS 2, 3,  AND 4.   A
                         SEPARATE CREW HAS BEEN ASSIGNED TO THE FGD SYSTEM AND CREW MEMBERS ARE MORE
                         CLOSELY SUPERVISED.

 10/83  A           93.5        95.0        96.4        77.0
       B           93.6        94.8        96.2        76.8
       SYSTEM      93.6        94.9        96.3        76.9                  744   603    572  49.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING OCTOBER 1983.

 11/83  A           97.0        95.8        96.8        90.9
       B           98.8        97.7        98.7        92.7
       SYSTEM      97.9        96.8        97.7        91.8                  720   683    661  63.8

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT SCHEDULED UNIT OUTAGES OCCURRED FROM NOVEMBER 4
                         TO NOVEMBER 5 AND FROM NOVEMBER 18 TO NOVEMBER 19.

 12/83  A           88.2        86.6        87.0        78.7
       B           88.2        86.5        87.0        78.6
       SYSTEM      88.2        86.6        87.0        78.7                  744   676    585  60.5
7/83
8/63
9/83
A
B
SYSTEM
A
B
SYSTEM
A
B
SYSTEM
96.5
95.5
96.0
96.0
95.0
95.5
99.6
99.0
99.3
95.8
94.5
95.1
93.8
91.3
92.6
98.9
98.2
98.5
96.3
95.0
95.6
96.4
93.9
95.2
99.6
98.9
99.3
91.6
90.4
91.0
70.3
68.5
69.4
94.6
94.1
94.5
                                            13-1053

-------
UTILITY FED SURVEY: OCTOBER 1983 - SEPTEMBER  1984

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 3  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  F6D   CAP.
                                                                 502  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A SCHEDULED UNIT OUTAGE  TOOK  PLACE  FROM DECEMBER 21 TO DECEMBER 2*, 1963.

                         THE F6D  SYSTEM WAS  OUT OF  SERVICE FROM DECEMBER 25 TO DECEMBER 28 DUE TO
                         FROZEN WATER LINES.
 1/84
  2/84
A
B
SYSTEM
A
B
SYSTEM
99.4
99.1
99.3
96.9
98.7
97.8
98.7
98.3
98.5
97.0
98.8
97.9
98.8
98.4
98.6
97.2
99.0
98.1
86.6
86.3
86.4
96.4
98.2
97.3
                                                                              744   653
                                                                                           643 49.0
                                                                              696   692    677 696.0

        «*  PROBLEMS/SOLUTIONS/COMMENTS

                          NO  MAJOR  FGD-RELATED  PROBLEMS WERE  REPORTED DURING JANUARY AND FEBRUARY.
  3/84
A
B
SYSTEM
33.6
31.8
32.7
96.1
90.9
93.5
                                          96.2
                                          91.0
                                          93.6
                                                        33.5
                                                        31.7
                                                        32.6
4/84

5/84

6/84

7/84

8/84

9/84
                                                                              744   259    243  16.0

        **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE YEARLY  SCHEDULED  BOILER  OUTAGE  OCCURRED BETWEEN MARCH 11 AND MARCH 31.

        SYSTEM                                                                 720

        SYSTEM                                                                 744

        SYSTEM                                                                 720

        SYSTEM                                                                 744

        SYSTEM                                                                 744

        SYSTEM                                                                 720

        »*  PROBLEMS/SOLUTIONS/COMMENTS

                          INFORMATION WAS UNAVAILABLE  FOR THE SECOND AND THIRD QUARTER OF 1984.
                                             13-1054

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
                                           SECTION 13
              DESIGN AND  PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION  LIMITATION - NG/J
NOX EMISSION  LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT  GENERATING CAPACITY W/FGD - MW
NET UNIT  GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT  DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL  DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE  HEAT CONTENT - J/G
     RANSE HEAT CONTENT - BTU/LB
     AVERAGE  ASH CONTENT - 7.
     RANSE ASH CONTENT - 7.
     AVERAGE  MOISTURE CONTENT - 7.
     RANSE MOISTURE CONTENT - '/.
     AVERAGE  SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE  CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE  CONTROL

 ** ESP
     NUMBER

 »« PARTICLE  SCRUBBER
     NUMBER
     GENERIC  TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL  SPECIFIC MATERIAL
     LINER  GENERIC MATERIAL
     LINER  SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

«•* FGD SYSTEM

 ** GENERAL  DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02  REMOVAL MODE
     PROCESS  TYPE
     SYSTEM  SUPPLIER
     A-E  FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN S02 REMOVAL EFFICIENCY - 7.
     ENERGY CONSUMPTION - 7.
     CURRENT  STATUS
     COMMERCIAL START-UP
               (****** LB/MMBTU)
               (**«»** LB/MMBTU)
               (****«* LB/MMBTU)
SOUTH CAROLINA PUBLIC SERVICE
WINYAH
4
GEORGETOWN
SOUTH CAROLINA
A
******
******
******
*****
  280
  252
  258
  280
RILEY STOKER
PULVERIZED COAL
BASE
********
*******
******
CONCRETE
*******
               (******* ACFM)
               (**** F)
               (**** FT)

               (***** FT)
COAL
BITUMINOUS
26749.

********
******
********
1.0-1.2
    1.70
******
********
******
               ( 11500 BTU/LB)
                ******
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
THROWAWAY PRODUCT
WET SCRUBBING
LIMESTONE
AMERICAN AIR FILTER
BURNS I ROE
FULL SCALE
NEW
   80.00
    2.1
 1
 9/81
                                             13-1055

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 4 (CONT.)

     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS

 »» QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 »* DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL  TYPE

 ** DUCTWORK
       SHELL GENERIC MATERIAL  TYPE
       SHELL SPECIFIC  MATERIAL TYPE
       LINER GENERIC MATERIAL  TYPE
       LINER SPECIFIC  MATERIAL TYPE

 *» REAGENT PREPARATION  EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 ** PUMPS
     SERVICE
    NR
** SOLIDS CONCENTRATING/DEWATERING
    DEVICE
                                                7/81
                                                1/79
                                               NR
                                               NR
                                               SPRAY TOMER
                                               OPEN COUNTERCURRENT SPRAY
                                               N/A
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               NONE
                                               PRIMARY COLLECTOR
                                               IMPINGEMENT
                                               BAFFLE
                                               CLOSED VANE
                                               NR
                                               NR
                                               INDIRECT HOT AIR
                                               EXTERNAL HEAT EXCHANGER
                                               STEAM TUBE BUNDLE
                                               NR
                                               NR
                                               CENTRIFUGAL
                                               NR
                                               FORCED DRAFT
                                               DRY
                                               CARBON STEEL
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               NR
                                               WET BALL MILL
                                               COMPARTMENTED
                                               NR
                                                 NUMBER

                                                 ***»


                                                 NA
                                           13-1056

-------
                                                  UTILITY F60 SURVEY: OCTOBER 1983 - SEPTEMBER 198*

SOUTH CAROLINA PUBLIC  SERVICE:  WINYAH 4 (CONT.)


*** SLUDGE

 ** TREATMENT
    METHOD                                      NR
    DEVICE                                      NR
    PROPRIETARY  PROCESS                        NR

 ** DISPOSAL
    NATURE                                      NR
    TYPE                                        NR
    SITE TREATMENT                             NONE

 ** WATER BALANCE
    WATER  LOOP TYPE                             CLOSED
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 7/81  SYSTEM                                                                744

 8X81  SYSTEM                                                                744

 9/81  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD OPERATION COMMENCED IN JULY 1981.  HOWEVER, ONLY ONE OF THE TWO
                         ABSORBER MODULES IS OPERATIONAL.  A MAJOR FIRE HAS DELAYED THE SCHEDULED
                         START-UP OF THE OTHER MODULE UNTIL FEBRUARY 1982.

10/81  SYSTEM                                                                744

11/81  A             .0          .0                      .0
       B           51.9        52.8        54.1        51.9
       SYSTEM      51.9        52.8        54.1        51.9                  720   709    374  79.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE A WAS STILL UNDER CONSTRUCTION IN NOVEMBER.

                         DURING THE MONTH PROBLEMS WERE ENCOUNTERED WITH THE CL PRESCRUBBER NOZZLES
                         PLUGGING AND WATER IN THE AIR SYSTEM.

                         DURING NOVEMBER THE CL PRESCRUBBER SECTION WAS COATED AND DEFLECTORS
                         WERE INSTALLED.

                         THE CL PRESCRUBBER PUMP WAS REPACKED.

12/81  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION FOR THE MONTHS OF OCTOBER AND DECEMBER WAS NOT AVAILABLE.

 1/82  A           24.6        28.7        27.1        24.6
       B             .0          .0          .0          .0
       SYSTEM      12.3        14.3        13.6        12.3                  744   638     92  55.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE B WAS OUT OF SERVICE DURING PART OF JANUARY DUE TO REPAIR OF THE
                         CHLORIDE PRESCRUBBER.

                         MODULE A WAS TAKEN OUT OF SERVICE ON JANUARY 8, 1982 DUE TO BADLY LEAKING
                                            13-1057

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 4 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X  REMOVAL   PER   BOILER   FGD   CAP.
                                                                S02   PART.  HOURS HOURS  HOURS FACTOR

                         DOOR FRAMES TO THE CHLORIDE PRESCRUBBER.

                         A SCHEDULED OUTAGE FOR THE UNIT OCCURRED  DURING  JANUARY.

                         ONLY ONE MODULE WAS USED FROM JANUARY, 1982  TO MARCH  30,  1982 DUE TO A FIRE
                         IN MODULE B.

 2/82  A           56.7        62.1        66.0        56.7
       B              .0           .0          .0          .0
       SYSTEM      28.3        31.1        33.0        28.3                  672   613   190  46.0

       *#  PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE A WAS OUT OF SERVICE DURING  PART OF FEBRUARY FOR MAINTENANCE.

                         REPAIR ON A HOLE IN THE CL PRESCRUBBER PUMP  RESULTED  IN OUTAGE  TIME
                         DURING THE MONTH.

                         THE DEVELOPMENT OF WATER IN THE AIR SYSTEM CREATED DOWN TIME  DURING
                         FEBRUARY.

                         MODULE A WAS ALSO DOWN DURING THE MONTH FOR  A CLEANING  OF THE CHLORIDE
                         PRESCRUBBER NOZZLES.

                         PLUGGED BLEED LINES RESULTED IN OUTAGE TIME  FOR  MODULE  A DURING THE MONTH.

                         A LEAK IN THE CHLORIDE PRESCRUBBER  PRODUCED  AN OUTAGE DURING  FEBRUARY.

                         THE UNIT WAS DOWN DURING THE MONTH  FOR PRECIPITATOR MAINTENANCE.

                         THE MODULE A SURGE PUMPS WERE ALSO  OUT OF SERVICE  DURING FEBRUARY AND LED
                         TO ADDITIONAL OUTAGE TIME.

 3/82  A           17.3        20.3        20.3        17.3
       B             3.2         3.8         3.8         3.2
       SYSTEM      10.3        12.1        12.1        10.3                  744   634    77  49.1

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE A SURGE PUMPS WERE OUT OF SERVICE  DURING  MARCH RESULTING IN OUTAGE
                         TIME.

                         MODULE B WAS UNDER CONSTRUCTION DURING THE MONTH AND  LATER PLACED BACK IN
                         SERVICE  ON MARCH 30.  THE UNIT WAS  ALSO BROUGHT  DOWN  WHILE THE  REPAIR WORK
                         ON MODULE B CONTINUED.

                         A LEAK IN THE CHLORIDE PRESCRUBBER  FORCED MODULE A OUT  OF SERVICE
                         DURING THE MONTH.

                         A UNIT TRIP ALSO OCCURRED DURING MARCH RESULTING IN DOWN TIME.

 4/82  A           45.0        45.4        45.3        45.0
       B           51.4        51.9        61.8        51.4
       SYSTEM      46.2        48.7        53.6        48.2                  720   713    347  68.2

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL MIST ELIMINATOR TRAYS  WERE  INSTALLED  IN  MODULE B.

                         MODULE B WAS OFF-LINE PART OF THE MONTH  TO CLEAN PLUGGED NOZZLES AND  DUE
                         TO A  LOW PH.

                         THE SYSTEM WAS OFF-LINE APPROXIMATELY  11  DAYS TO CLEAN  THE THICKENER
                         OVERFLOW TANKS.
                                             13-1058

-------
                                                  UTILITY  F6D  SURVEY:  OCTOBER  1983  -  SEPTEMBER

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 4  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY  OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL   PER   BOILE9   FGO   CAP.
                                                                S02   PART.  HOURS HOURS  HOURS  FACTOR

                         PROBLEMS WERE  EXPERIENCED WITH THE REACTION TANK LEVEL  CONTROLLER CAUSING
                         MODULE  A DOWN  TIME.

                         DURING  APRIL THE RECYCLE PUMPS FOR MODULE A WERE REPACKED.

                         THE  SPRAY NOZZLES  ON MODULE A WERE PLUGGED  AND  REQUIRED THE  MODULE TO BE
                         SHUT DOWN FOR  CLEANING.

                         MODULE  A EXPERIENCED A LEAK IN THE CHLORIDE PRESCRUBBER.

 5/62  A           48.7       49.3        49.3        48.7
       B           43.6       44.2        44.2        43.6
       SYSTEM       46.1       46.7        46.7        46.1                  744   735   344  71.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING  MAY THE SPRAY NOZZLES  PLUGGED REQUIRING  DOWN TIME FOR CLEANING.

                         SOME OF THE PUMPS  WERE REPACKED DURING THE  MONTH.

                         THE  UTILITY REPORTED EXPERIENCING DAMPER PROBLEMS IN MAY.

                         THE  THICKENER  TANKS AND THE QUENCHER TANKS  REQUIRED DOWN TIME IN MAY  TO
                         BE CLEANED.

 6/82  A           26.6        26.6        27.0        26.6
       B           64.9        64.2        65.2        64.2
       SYSTEM       45.7        45.4        46.1        45.4                  720   719   327  65.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DAMPER  PROBLEMS CONTINUED IN  JUNE WITH THE  A MODULE INLET DAMPER MAL-
                         FUNCTIONING.

                         BOTH SURGE PUMPS WERE OUT OF  SERVICE AT ONE POINT IN JUNE.

                         LOW  QUENCHER FLOW CAUSED ADDITIONAL DOWN TIME FOR THE SYSTEM DURING MAY
                         AND  JUNE.

 7/82  A           63.2        62.3        62.4        61.7
       B           78.9        78.1        78.2        77.4
       SYSTEM       71.1        70.2        70.3        69.6                  744   738   518  71.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A CLEANING OF  THE  CL PRESCRUBBER NOZZLES AND HEADER RESULTED IN OUTAGE
                         TIME FOR THE FGD SYSTEM DURING JULY.

                         MAINTENANCE OF AN INLET DAMPER CONTRIBUTED  TO THE OUTAGES DURING JULY.

                         MAINTENANCE OF ADDITIVE FEED  PUMPS ALSO LED TO  DOWN TIME DURING THE  MONTH.

                         THE  REPLACEMENT OF MIST ELIMINATOR WASH NOZZLES TOOK PLACE DURING  JULY
                         AND  CAUSED ADDITIONAL OUTAGE  TIME.

                         THE  REPAIR OF  CL PRESCRUBBER  LEAKS PRODUCED OUTAGES DURING THE  MONTH.

                         THE  UNPLUGGING OF A MASS ADDITIVE FLOW CONTROLLER REQUIRED DOWN TIME FOR
                         THE  FGD SYSTEM DURING JULY.

                         THE  DRAINING AND CLEANING OF  SLURRY HOLD TANKS CONTRIBUTED TO FGD  SYSTEM
                         OUTAGES DURING THE MONTH.

 8/82  A           53.5        53.4        53.3        52.3
                                            13-1059

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 4  (CONT.)
	,_	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR
  9/82
 10/82
 11/82
       B
       SYSTEM
            45.6
            49.5
            45.6
            49.5
            45.5
            49.4
            44.7
            48.5
744   728    361  68.8
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE CLEANING OF ADDITIVE SUPPLY  PUMP SUCTION  LINES RESULTED  IN DOWN TIME
                         FOR THE FGD SYSTEM DURING AUGUST.

                         THE REMOVAL OF PLUGGAGE FROM A CL  PRESCRUBBER  TROUGH  CAUSED  SOME OUTAGE
                         TIME DURING THE MONTH.

                         THE REPAIR OF CL PRESCRUBBER FLOOR LEAKS CONTRIBUTED  TO  OUTAGcS DURING
                         AUGUST.

                         MAINTENANCE OF SLURRY HEADER LEAKS ALSO LED TO FGD SYSTEM OUTAGE TIME.

                         MAINTENANCE OF THICKENER SURGE PUMPS RESULTED  IN  DOWN TIME FOR THE FGD
                         SYSTEM DURING AUGUST.

                         THE CLEANING OF CL PRESCRUBBDR-NOZZLES CAUSED  ADDITIONAL OUTAGE TIME
                         DURING THE MONTH.
       A
       B
       SYSTEM
            22.9
            21.0
            22.0
            34.9
            35.0
            34.9
            34.9
            35.0
            34.9
            21.0
            21.0
            21.0
                                                                              720    433
                                                                                   151  42.4
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          PUMP  MAINTENANCE WAS A  PRIMARY CAUSE OF  FGD  SYSTEM OUTAGES DURING
                          SEPTEMBER.

                          AN  INSPECTION OF REACTION TANK MIXERS  RESULTED  IN  DOWN TIME DURING THE
                          MONTH.

                          THE UNIT  WAS TAKEN  OUT  OF SERVICE  ON OCTOBER 19 FOR A SCHEDULED  OUTAGE.  A
                          TURBINE INSPECTION  WAS  MADE.
        A
        B
        SYSTEM
              .0
              .0
              .0
              .0
              .0
              .0
              .0
              .0
              .0
              .0
              .0
              .0
                                                                              744
                                                                                     71
                                                                                                4.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          THE  SCHEDULED TURBINE  INSPECTION OUTAGE  CONTINUED  UNTIL OCTOBER  27,  1932.
                          THE  OUTAGE  WAS  CONTINUED  THROUGHOUT  THE  MONTH  FOR  MAINTENANCE  ON VARIOUS
                          COMPONENTS  OF THE  FGD  SYSTEM.
        A
        B
        SYSTEM
            64.5
            46.1
            55.3
            73.2
            52.3
            62.8
            73.2
            52.3
            62.8
            64.5
            46.1
            55.3
                                                                              720    634
                                                                                           398  54.5
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         MAINTENANCE OF CL  PRESCRUBBER  LEAKS TOOK  PLACE  DURING NOVEMBER AND
                         CONTRIBUTED TO OUTAGE  TIME.

                         MAINTENANCE OF THICKENER  SURGE PUMPS  RESULTED IN DOWN TIME DURING THE
                         MONTH.
 12/82
A
B
SYSTEM
71.3
70.4
70.9
77.1
72.5
74.8
77.1
72.5
74.8
                                                        56.7
                                                        53.3
                                                        55.0
                                                                      744   548    409  43.9
                                             13-1060

-------
                                                 UTILITY  FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 4  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY  UTILIZATION   X  REMOVAL    PER  BOILER  FGD   CAP.
                                                                S02   PART. HOURS HOURS  HOURS FACTOR


      «*  PROBLEMS/SOLUTIONS/COMMENTS

                        CL  PRESCRUBBER NOZZLES WERE CLEANED  DURING  DECEMBER LEADING TO OUTAGE
                        TIME.

                        THE UNIT WAS TAKEN OUT OF  SERVICE  FROM DECEMBER 24,  1982 TO JANUARY 2, 1983
                        FOR A  SCHEDULED OUTAGE.

 1/83 A          89.3         88.6         89.3        85.9
      B          85.9         8*.9         85.6        82.3
      SYSTEM      87.6         86.8         87.4        84.1                  744    721    626  57.1

      »*  PROBLEMS/SOLUTIONS/COMMENTS

                        THE UNIT WAS OUT OF SERVICE JANUARY  1  AND 2 FOR A SCHEDULED OUTAGE.

                        PROBLEMS CONTROLLING PH WERE  EXPERIENCED  DURING JANUARY.

                        MAINTENANCE ON THE MODULE  B INLET  DAMPER  CONTRIBUTED TO THE OUTAGE TIME
                        DURING THE  MONTH.

                        THE SYSTEM  EXPERIENCED CL  PRESCRUBBER  FLOW  PROBLEMS DURING JANUARY.

                        MAINTENANCE OF RECYCLE PUMPS  RESULTED  IN  DOWN TIME  DURING  THE MONTH.

 2/83 A          50.1         69.8         70.5        49.9
      B          21.9         30.6         30.9        21.9
      SYSTEM      36.0         50.2         50.7        35.9                  672    481    241  42.4

      «*  PROBLEMS/SOLUTIONS/COMMENTS

                        THE UNIT WAS OUT OF SERVICE FROM FEBRUARY 8 TO FEBRUARY 11 AND AGAIN FROM
                        FEBRUARY 23 TO FEBRUARY 28 FOR SCHEDULED  OUTAGES.

                        MAINTENANCE OF AN  INLET PRESSURE TRANSMITTER TOOK PLACE DURING FEBRUARY.

                        THE SYSTEM  EXPERIENCED CL  PRESCRUBBER  FLOW  PROBLEMS DURING THE MONTH.

                        MAINTENANCE OF RECYCLE PUMPS  TOOK  PLACE DURING FEBRUARY.

                        A CL PRESCRUBBER HEADER LEAK  OCCURRED  DURING THE MONTH.

                        PROBLEMS CONTROLLING PH WERE  EXPERIENCED  DURING FEBRUARY.

 3/83 A          79.3         63.7         65.6        42.7
      B          31.4         25.3         26.1        17.0
      SYSTEM      55.4         44.5         45.8        29.9                  744    499    222  43.2

      **  PROBLEMS/SOLUTIONS/COMMENTS

                        THE UNIT WAS OUT OF SERVICE FROM MARCH 1  TO MARCH 3 AND AGAIN  FROM MARCH 8
                        TO MARCH 13 FOR SCHEDULED  OUTAGES.

                        MODULE B WAS OUT OF SERVICE DURING MARCH  DUE TO MAINTENANCE  OF AN INLET
                        DAMPER.

                        CHLORIDE PRESCRUBBER PROBLEMS OCCURRED DURING THE MONTH.

 4/83 A          87.6         84.6         85.7        77.5
      B          49.3         48.2         48.8        44.2
      SYSTEM      68.4         66.4         67.2        60.8                  720    659    438  58.6
                                            13-1061

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 4  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 502  PART.  HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE B WAS OUT OF SERVICE FROM APRIL I TO APRIL  15 DUE TO INLET DAMPER
                         MAINTENANCE.

                         LEAKS WERE REPAIRED IN THE CL PRESCRUBBER DOOR AND HEADER DURING APRIL.

                         QUENCHER NOZZLES WERE UNPLUGGED DURING THE MONTH.

                         MAINTENANCE WAS REQUIRED ON SLURRY  RECYCLE PUMPS DURING APRIL.

  5/83  A            85.3        82.5         83.0         78.2
       B            88.1        85.2         85.7         80.7
       SYSTEM       86.7        83.9         84.3         79.4                   7*4   705    591  65.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE A EXPERIENCED PH CONTROL PROBLEMS DURING MAY.

                         A MODULE INSPECTION WAS PERFORMED DURING MAY ACCOUNTING FOR OUTAGE TIME.

                         SPRAY NOZZLE MODIFICATIONS WERE MADE  DURING THE MONTH RESULTING IN OUTAGE
                         TIME.

                         CL  PRESCRUBBER FLOW PROBLEMS  WERE ENCOUNTERED DURING MAY MAKING IT
                         NECESSARY TO DRAIN THE TANK.

                         A COMMON BLEED DISCHARGE LINE HAD TO  BE UNPLUGGED  DURING MAY ACCOUNTING
                         FOR OUTAGE TIME.

  6/83  A            84.7        84.7         84.7         84.7
       B            86.3        86.3         86.3         86.3
       SYSTEM       85.5        85.5         85.5         85.5                   720   720    616  57.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         AN  INSPECTION OF THE B MODULE INTERNAL COMPONENTS  WAS PERFORMED DURING
                         JUNE.

                         REPAIRS WERE MADE  ON A LEAK IN THE  CL PRESCRUBBER  DUCTWORK.

                         RUPTURED SEAL WATER LINES WERE REPAIRED DURING THE MONTH OF JUNE.

  7/83  A            79.4        77.1         77.5         70.8
       B            97.6        96.9         97.3         88.9
       SYSTEM       88.5        87.0         87.4         79.9                   744   683    594  59.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE A WAS OUT OF SERVICE FROM JULY 11 TO JULY 16 FOR MODIFICATION  OF THE
                         INTERNAL MODULE COMPONENTS.
                                                                              744   741    732   68.2
                                                                              720   696    685  59.5
8/83


9/83


A
B
SYSTEM
A
B
SYSTEM
98.9
98.2
98.6
98.8
99.1
99.0
99.3
98.5
98.9
98.1
98.5
98.3
99.3
98.5
98.9
98.7
99.1
98.9
98.8
98.1
98.4
94.9
95.2
95.1
                                             13-1062

-------
                                                 UTILITY  F6D  SURVEY: OCTOBER  1983  - SEPTEMBER
SOUTH CAROLINA PUBLIC SERVICE: WINYAH 4  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL    PER   BOILER   FGD   CAP.
                                                                S02   PART.  HOURS HOURS   HOURS  FACTOR
       «* PROBLEMS/SOLUTIONS/COMMENTS
 12/83
 3/84
                        THE UTILITY  REPORTED  THAT HIGH  AVAILABILITY DURING THE  THIRD QUARTER OF
                        1983 CAN  BE  ATTRIBUTED  TO PERSONNEL CHANGES MADE  AT UNITS  Z, 3, AND 4.  A
                        SEPARATE  CREW  HAS BEEN  ASSIGNED TO THE  FGD  SYSTEM AND CREW MEMBERS ARE MORE
                        CLOSELY SUPERVISED.
10/83  A
       B
       SYSTEM
24.3
24.3
24.3
99.2
99.2
99.2
99.2
99.2
99.2
24.3
24.3
24.3
                                                                             744    183
                                                                       181  15.1
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         A  SCHEDULED  ANNUAL MAINTENANCE  OUTAGE FOR  THE  UNIT AND  FGD  SYSTEM OCCURRED
                         FROM OCTOBER 8 TO THE END OF THE MONTH.
11/63  A
       B
       SYSTEM
84.1
86.4
85.2
73.9
76.1
75.0
90.3
93.0
91.7
73.9
76.1
75.0
                                                                             720    720
                                                                       540  48.5
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE  ANNUAL MAINTENANCE OUTAGE WHICH  BEGAN IN OCTOBER  CONTINUED UNTIL NOVEM-
                         BER  3,  1983.

                         A SCHEDULED UNIT OUTAGE TOOK PLACE"FROM NOVEMBER  8 TO NOVEMBER 11,  1983.

                         SLURRY  PUMP TRIPS ACCOUNTED FOR ABSORBER OUTAGE TIME  DURING  NOVEMBER.

                         AN ACCIDENTAL BREAKAGE OF THE AIR LINE TO AN INLET DAMPER  CYLINDER  CAUSED
                         ADDITIONAL DOWN TIME DURING THE MONTH.

                         REPAIR  OF A SPRAY HEADER LEAK ACCOUNTED FOR ABSORBER  DOWN  TIME DURING
                         NOVEMBER.

                         THE  UNPLUGGING OF CHLORIDE PRESCRUBBER SPRAY NOZZLES  AND CHEVRONS CONTRI-
                         BUTED TO FGD SYSTEM OUTAGES DURING THE MONTH.
       A
       B
       SYSTEM
89.2
89.0
89.1
87.7
86.6
87.1
88.8
87.7
88.2
81.3
80.3
80.8
744   690
601  58.9
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         BOILER TUBE LEAKS ACCOUNTED FOR A FORCED UNIT OUTAGE FROM DECEMBER  24 TO
                         DECEMBER 27,  1983.

                         FROZEN WATER  LINES RESULTED IN AN ABSORBER OUTAGE FROM DECEMBER 27  TO
                         DECEMBER 28,  1983.
A
B
SYSTEM
A
B
SYSTEM
A
B
SYSTEM
95.6
96.3
96.0
100.0
100.0
100.0
94.4
95.5
94.9
95.5
96.2
95.9
92.7
92.7
92.7
90.7
92.1
91.4
95.5
96.2
95.8
95.8
95.8
95.8
92.3
93.8
93.1
92.4
93.1
92.8
21.1
21.1
21.1
67.5
68.6
68.1
                                                                             744   720
                                                                             696   158
                                                                             744   554
                                                                       690  60.9
                                                                       147  11.2
                                                                       506  45.8
                                            13-1063

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER  1984

SOUTH CAROLINA PUBLIC SERVICE: WINYAH 4  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS FACTOR


       «* PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR  FGD-RELATED  PROBLEMS MERE  REPORTED DURING THE FIRST QUARTER OF
                         1984.

 4/84  SYSTEM                                                                 720

 5/84  SYSTEM                                                                 744

 6/84  SYSTEM                                                                 720

 7/84  SYSTEM                                                                 744

 6/84  SYSTEM                                                                 744

 9/84  SYSTEM                                                                 7ZO

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS  UNAVAILABLE FOR  THE SECOND AND  THIRD QUARTER OF 1984.

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
                                           SECTION 13
              DESIGN AND  PERFORMANCE DATA FOR OPERATIONAL DOMESTIC F6D SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION  LIMITATION - NG/J
S02 EMISSION  LIMITATION  - NG/J
NOX EMISSION  LIMITATION  - NG/J
NET PLANT GENERATING  CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA -  BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE  LOAD
     DESIGN BOILER FLUE  GAS FLOW - CU.M/S
     BOILER FLUE GAS  TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER  - M

 *# FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE  HEAT CONTENT - J/G
     RANSE HEAT  CONTENT  - BTU/LB
     AVERAGE  ASH CONTENT - V.
     RANGE ASH CONTENT - 7.
     AVERAGE  MOISTURE CONTENT - 7.
     RAK3E MOISTURE  CONTENT - 7.
     AVERAGE  SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE  CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

**» PARTICLE  CONTROL

 ** MECHANICAL COLLECTOR
     NUMBER
     TYPE

 *» ESP
     NUMBER
     NUMBER OF SPARES
     TYPE
     SUPPLIER
     INLET FLUE  GAS  CAPACITY - CU.M/S
     INLET FLUE  GAS  TEMPERATURE - C
     PRESSURE DROP -  KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE  SCRUBBER
     NUMBER
     GENERIC  TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC  MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC  MATERIAL
     GAS CONTACTING  DEVICE TYPE

*** FGD SYSTEM
SOUTH MISSISSIPPI ELEC PWR
R.D. MORROW, SR.
1
PURVIS
MISSISSIPPI
D
  516.
  301.
  400
  200
  190
  195
  124
RILEY STOKER
PULVERIZED COAL
BASE
  335.76
 .132.2
  122.
CONCRETE
    3.3
                  .100 LB/MMBTU)
                  .200 LB/MMBTU)
                  .700 LB/MMBTU)
                 711500 ACFM)
                 270 F)
                 400 FT)
               ( 10.7 FT)
                ( 12250 BTU/LB)
                11500-12500
COAL
BITUMINOUS
28493.

   10.00
8.0-12.0
    6.50
6.0-7.0
    1.64
1.0-1.8
     .12
0.10-0.13
 0
NONE
 1
 0
HOT SIDE
BUELL DIVISION,  ENVIROTECH
  579.5         (1228000  ACFM)
  426.7         (   800  F)
     .1         (   0. IN-H20)
   99.6
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                            13-1065

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

SOUTH MISSISSIPPI ELEC PMR: R.D. MORROW, SR. 1 (CONT.)
 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN SOS REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 #* DESIGN AMD OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X
     DESIGN COAL HEAT CONTENT - J/G
     DESIGN COAL ASH- CONTENT - X
     DESIGN MOISTURE CONTENT - X
     DESIGN CHLORIDE CONTENT - X
     OPER. 4 MAINT. REQUIREMENT - MANHR/DAY

 «* QUENCHER/PRESATURATOR

 ** ABSORBER
     NUMBER
     NUM3ER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO -  L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL  EFFICIENCY - X
     PARTICLE REMOVAL EFFICENCY - X

  ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUM3ER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     MANUFACTURER
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     DISTANCE BETWEEN STAGES - CM
     DISTANCE BETWEEN VANES - CM
     PRESSURE DP.OP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
 THROWAMAY PRODUCT
 WET SCRUBBING
 LIMESTONE
 NONE
 ENVIRONEERING, RILEY STOKER
 BURNS & MCDONNELL
 FULL SCALE
 NEW
X   99.60
    85.00
     2.5
  1
  8/78
  8/78
  5/75
                ( 12000 BTU/LB)
    1.30
27912.0
   15.00
    6.50
     .01
   83.0
  1
  0
 PACKED TOWER
 ROD DECK
 VENTRI-SORBER
 ENVIRONEERING•
 51.5 WIDE X 47.7 HIGH X
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC; HIGH ALLOY
 SYNTHETIC RUBBER; NICKEL BASE/CHROMIUM-IRON-MOLY
 CHLOROBUTYL; HASTELLOY c-276
 ROD DECKS
  4
  1260.
     6.0
     2.0
     3.0
   208.58
   132.2
    85.0
      .0
               RILEY STOKER
                        22.0 DEEP
               (20000 GPM)
               (  45.2 GAL/1000 ACF)
               (  8.0 IN-H20)
               (  10.0 FT/S)
               (  442000 ACFM)
               (   270 F)
 PRIMARY COLLECTOR
  1
  0
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 ENVIRONEERING
 VERTICAL
     2
     3
    91.44       (36.0 IN)
    53.3        (21.00 IN)
       .9        ( 3.5 IN-H20)
 ORGANIC
 FIBER-REINFORCED POLYESTER
 SUPERNATANT FOR FIRST STAGE; MAKEUP FOR SECOND S
                                             13-1066

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH MISSISSIPPI ELEC  PUR:  R.D.  MORROW,  SR.  1 (CONT.)
     WASH FREQUENCY
     WASH RATE -  L/S

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE  NAME/COMMON TYPE
     PERCENT GAS  BYPASSED - AVG
     TEMPERATURE  INCREASE - C
     INLET  FLUE GAS FLOW RATE - CU. M/S
     INLET  FLUE GAS TEMPERATURE - C
     OUTLET FLUE  GAS  TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE  GAS FLOW RATE - CU.M/S
     FLUE  GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 »* DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER  GENERIC MATERIAL TYPE
     LINER  SPECIFIC MATERIAL TYPE
INTERMITTENT
   15.8
BYPASS
COLD SIDE
N/A
   38.0
   28.9
  190.65
   52.2
   86.7
               (  250 GAL/MIN)
  52 F)
404000 ACFM)
 126 F)
 188 F)
CARBON STEEL; HIGH ALLOY
AISI 1110> NICKEL BASE/CHROMIUM-IRON-COPPER-MOLY
 2
 0
CENTRIFUGAL
GREEN FAN
UNIT
FORCED DRAFT
DRY
  201.03       ( 426000 ACFM)
  148.9        (  300 F)
CARBON STEEL
SHUT-OFF
LOUVER
PARALLEL BLADE MULTILOUVER
RILEY STOKER
CARBON STEEL
AISI 1110
NONE
N/A
SHUT-OFF
LOUVER
PARALLEL BLADE KULTILOUVER
RILEY STOKER
CARBON STEEL
AISI 1110
NONE
N/A
SHUT-OFF
LOUVER
PARALLEL BLADE MULTILOUVER
DAMPER DESIGN
HIGH ALLOY [SEALS]
NICKEL BASE/CHROMIUM-MOLYBDENUM-NICKEL-COPPER
ORGANIC
NATURAL RUBBER
 1
CONTROL
LOUVER
PARALLEL BLADE MULTILOUVER
RILEY STOKER
CARBON STEEL
AISI 1110
NONE
N/A
                                            13-1067

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROW, SR. 1 (CONT.)
 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION  EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER
     NUMBER OF  SPARES
     FULL LOAD  DRY FEED  CAPACITY - M.TONS/HR
     PRODUCT QUALITY - X SOLIDS

 *» TANKS
     SERVICE
      REAGENT PREP PRODUCT
      ABSORBER RECYCLE
      MILL SUMP
      THICKENER SUPPLY  SUMP
      THICKENER OVERFLOW
      ME WASH

  «» PUMPS
      SERVICE
      ABSORBER RECIRCULATION
      SLURRY TRANSFER
      MILL SLURRY
      ME WASH
      CLEAR WATER TRANSFER  [SUPERNATANT]
      THICKENER UNDERFLOW

  ** SOLIDS CONCENTRATING/DEWATERING
      DEVICE
      NUMBER
      NUMBER OF SPARES
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE
      BELT GENERIC MATERIAL TYPE
      BELT SPECIFIC MATERIAL TYPE
      FEED STREAM SOURCE
      FEED STREAM CHARACTERISTICS
      OUTLET STREAM CHARACTERISTICS
CONTROL
LOUVER
PARALLEL BLADE MULTILOUVER
RILEY STOKER
CARBON STEEL
AISI 1110
NONE
N/A
SCRUBBER INLET
RECTANGULAR
CARBON STEEL
AISI 1110
NONE
N/A
SCRUBBER OUTLET TO STACK
RECTANGULAR
CARBON STEEL
AISI 1110
HIGH ALLOY
NICKEL BASE/CHROMIUM-IRON-COPPER-MOLYBDENUM
WET BALL MILL
COMPARTMENTED
TUBE MILL
KENNEDY VAN SAUN
 1
 0
    7.3        (   8 TPH)
   35.0
NUMBER

   1
   1
   1
   1
   1
   1
NUMBER

   3
   Z
   Z
   Z
   Z
   Z
VACUUM FILTER
 1
0
CARBON STEEL
AISI 1110
ORGANIC
EPOXY
ORGANIC
NYLON
THICKENER UNDERFLOW
40X SOLIDS
70X SOLIDS
                                             13-1068

-------
                                                  UTILITY FED SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH MISSISSIPPI ELEC  PWR:  R.D.  MORROW,  SR.  1 (CONT.)
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF  SPARES
     DIMENSIONS - FT
     CAPACITY
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OVERFLOW STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION
TO PUG MILL AND DISPOSAL
TO THICKENER
THICKENER
 1
0
60.0 DIA X 11.0
230000
CARBON STEEL
AISI 1110
ORGANIC
BITUMASTIC
ABSORBER BLEED
70-100 GPM PER UNIT, 15X SOLIDS
40X SOLIDS
<5X SOLIDS
TO VACUUM FILTER
TO MILL SLURRY TANK, ABSORBER ME TANK, AND RECYC
*** SLUDGE
     FULL LOAD  SLUDGE QUANTITY - M.TONS/HR (DRY)
     MOISTURE CONTENT - X TOTAL FREE WATER
     X CAS03 -  DRY
     X CAS04 -  DRY
     X CAOH2 -  DRY
     X CAC03 -  DRY
     X ASH - DRY
     X OTHER COMPOUNDS - DRY

 »* TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS
     INLET QUALITY - X

 ** DISPOSAL
     NATUPE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT
     SITE DIMENSIONS
     SITE CAPACITY - CU.M
     SITE SERVICE LIFE - YRS

 ** PROCESS CONTROL AND INSTRUMENTATION
     PROCESS STREAM
     CHEMICAL PARAMETERS
     PHYSICAL VARIABLES
     CONTROL LEVELS
     MONITOR TYPE
     MONITOR LOCATION
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE

 ** WATER BALANCE
     WATER LOOP TYPE

 ** CHEMICALS AND CONSUMPTION
     FUNCTION
     NAME
     PRINCIPAL  CONSTITUENT
     SOURCE/SUPPLIER
     CONSUMPTION
     UTILIZATION - X
     POINT OF ADDITION
    3.6        (    4.0 TPH)
   20.0
   20.0
   70.0
    5.0
    5.0
    5.0
    1.0
FIXATION
PUG MILL
NONE
   70.0
FINAL
LANDFILL
ON-SITE
TRUCK/CONVEYED
CLAY LINING  JNATURAL]
13 ACRES X 30 FEET
    476970     (   390.0 ACRE-FT)
  6
ABSORBER RECYCLE, FLUE GAS
PH, S02
DENSITY, FLOW
PH 5.4-5.6, S02 - 1.2 LB/MM BTU
L 4 N, LEAR SIEGLER
RECYCLE TANK/INLET DUCT
AUTOMATIC
FEEDBACK
CLOSED
ABSORBENT
LIMESTONE
>S5X CAC03
CALERA QUARRY
70 TONS/DAY  (2 UNITS  AT  FULL LOAD!
   60.0
BALL MILL
                                            13-1069

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH MISSISSIPPI ELEC PWR: P.O. MORROW, SR. 1  (CONT.)
 ** FGD SPARE CAPACITY INDICES
     ABSORBER - X                                     .0
     MIST ELIMINATOR - X                              .0
     FAN - X                                          .0
     BALL MILL - 7.                                    .0
     THICKENER - X                                    .0
     VACUUM FILTER - X                                .0

 ** FGD SPARE COMPONENT INDICES
     ABSORBER                                         .0
     MIST ELIMINATOR                                  .0
     FAN                                              .0
     BALL MILL                                        .0
     THICKENER                                        .0
     VACUUM FILTER                                    .0
 	PERFORMANCE  DATA		
 PERIOD  MODULE  AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   X REMOVAL   PER  BOILER FGD   CAP.
                                                                 SOS   PART.  HOURS HOURS  HOURS FACTOR


  8/78   SYSTEM                                                                 744

  9/78   SYSTEM                                                                 720

        **  PROBLEMS/SOLUTIONS/COMMENTS

                          A  FORCED  BOILER OUTAGE  OCCURRED DURING THE PERIOD AS A RESULT OF  BOILER
                          TUBE  LEAKS.  THE  UNIT IS EXPECTED  TO  START UP AGAIN IN EARLY NOVEMBER.

 10/78   SYSTEM                                             .0                   744     0      0    .0

 11/78   SYSTEM                                             .0                   720     0      0    .0

        «*  PROBLEMS/SOLUTIONS/COMMENTS

                          OPERATION OF THE  UNIT WAS  INTERMITTENT DUE TO CONTINUING BOILER TUBE
                          PROBLEMS.  THE BOILER WAS  SHUT DOWN NOVEMBER 1 AS A RESULT OF BOILER TUBE
                          PROBLEMS.  RESUMPTION OF OPERATION IS SCHEDULED FOR MARCH 1979.

                          THE  FGD SYSTEM WAS BYPASSED  ENTIRELY  IN OCTOBER DUE TO SERIOUS CONTROL
                          VALVE PLUGGING.

 13/78   SYSTEM                                             .0                   744     0      0    .0

  1/79   SYSTEM                                             .0                   744     0      0    .0

        **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE  UNIT  HAS NOT  YET BEEN  RESTARTED SINCE  THE NOVEMBER SHUTDOWN.

  2/79   SYSTEM                                             .0                   672     0      0    .0

  3/79   SYSTEM                                             .0                   744     0      0    .0

  4/79   SYSTEM                                                                 7ZO   631

        **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE BOILER RETURNED TO SERVICE ON  APRIL 1 AFTER COMPLETION OF REPAIRS
                          TO  THE BOILER TUBES.

                          NO  FGD SYSTEM RELATED PROBLEMS WERE REPORTED BY THE UTILITY FOR APRIL.

  5/79   SYSTEM                                                                 744

  6/79   SYSTEM                                                                 720
                                             13-1070

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER 1984

SOUTH MISSISSIPPI ELEC PWR: R.O.  MORROW,  SR.  1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABIHTY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR


      «*  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE SYSTEM OPERATED MOST OF MAY AND JUNE WITH
                         NO  MAJOR PROBLEMS.

 7/79 SYSTEM                                                                 744

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FIRST WEEK OF JULY THE UNIT WAS REMOVED FROM SERVICE DUE TO
                         SEVERE PROBLEMS WITH THE FGD  SYSTEM.  THE UTILITY  NOTED THAT ABOUT HALF
                         OF  THE MODULE HEADERS WERE PLUGGED, HOLES WERE NOTED IN THE MODULE SHELL,
                         THE UPPER ROD BANK  CORRODED AWAY FROM THE SHELL, AND EXTENSIVE PLUGGING
                         OF  THE MIST ELIMINATOR OCCURRED.  LINER FAILURE AT THE OUTLET DUCTWORK WAS
                         ALSO EXPERIENCED.   THE UTILITY PLANS TO REPLACE THE DUCTWORK WITH
                         HASTALLOY.  THE FGD SYSTEM IS EXPECTED TO BE OFF LINE FOR SEVERAL MONTHS
                         FOR REPAIRS TO BE  COMPLETED.

 8/79 SYSTEM         .0                                  .0                  744     0      0    .0

 9/79 SYSTEM         .0                                  .0                  720     0      0    .0

      #*  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT REMAINED  OFF LINE DURING THE MONTHS OF AUGUST AND SEPTEMBER AS
                         MAINTENANCE AND REPAIR WORK CONTINUED.

 10/79  SYSTEM         .0          .0          .0          .0                  744   282      0  23.0

 11/79  SYSTEM         .0          .0          .0          .0                  720            0

 12/79  SYSTEM         .0          .0          .0          .0                  744            0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCRUBBER HAS REMAINED OFF LINE THROUGH THE REPORT PERIOD DUE TO THE
                         LINING FAILURE.  RELINING SHOULD BE COMPLETED AND  THE UNIT ON LINE IN
                         MARCH.

 1/80  SYSTEM         .0                      .0          .0                  740     0      0    .0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT REMAINED OFF LINE DURING JANUARY AS RELINING OF THE SCRUBBERS
                         WAS COMING TO COMPLETION.

                         THE PRESATURATOR AREAS, BYPASS DUCTS, AND THE SECTIONS OF DUCT FROM
                         ABSORBER EXITS AT POINTS WHERE BYPASSED GAS MIXES WITH WET GAS ALL THE
                         WAY TO THE STACK ARE BEING LINED WITH HASTELLOY G (A 1/8 INCH LINING IS
                         BEING WELDED TO THE EXISTING CARBON STEEL).
                         THE MAIN BCDY OF THE ABSORBER MODULES IMMEDIATELY ABOVE THE PRESATURATOR
                         SECTIONS ALL THE WAY TO THE ABSORBER EXIT IS BEING LINED WITH CHLOROSUTYL
                         RUBBER (ON THE EXISTING CARBON STEEL).

 2/80  SYSTEM         .0                      .0          .0                  696     0       0    .0

 3/80 SYSTEM       41.5        95.1       100.0        39.5                  744   309    294

      #*  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH THE UNIT 1 FGD SYSTEM RETURNED TO SERVICE OPERATING 294 HOURS.

 4/80 SYSTEM      100.0        99.0       100.0        99.0                  720   720    713
                                            13-1071

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER  1964

SOUTH MISSISSIPPI ELEC PWR: P.O. MORROW, SR.  1  (CONT.)
_	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THERE WERE NO OPERATIONAL PROBLEMS  RELATED TO THE  FGD SYSTEM DURING APRIL.
                         FOUR INSPECTIONS WERE  PERFORMED WHICH REQUIRED THE FGD SYSTEM TO BE OUT
                         OF SERVICE FOR SEVEN HOURS.

 5/80  SYSTEM      99.7        99.8       100.0       88.7                   744   660    658

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS SCHEDULED TO BE OUT  OF SERVICE FOR  84 HOURS TO CLEAN THE
                         AIR PREHEATERS.  THE BOILER OPERATED  THE REMAINING HOURS IN MAY.

                         THE FGD SYSTEM WAS SCHEDULED  TO BE  OUT OF SERVICE  FOR 1.5 HOURS FOR ROU-
                         TINE MODULE INSPECTION.  THE  FGD SYSTEM WAS AVAILABLE 99.7Z DURING MAY.

 6/80  SYSTEM      99.2        97.0        99.0       93.0                   720   690    668  68.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JUNE OPERATIONS CAME TO A HAULT FOR APPROXIMATELY SIX HOURS TO CLEAN
                         THE MIST  ELIMINATORS.  OTHER  OUTAGE TIME DURING THE MONTH WAS CAUSED
                         BY BOILER-RELATED PROBLEMS.

 7/80  SYSTEM      94.1        99.3        99.3       94.1                   744   705    700  67.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JULY THE SCRUBBER WAS  INSPECTED FOR SCALE ACCUMULATION AND A TRIP
                         TEST WAS  CONDUCTED ON  THE SCRUBBER  CONTROLS TO CHECK ON EARLIER MODIFICA-
                         TIONS.

                         THE MAJORITY OF OUTAGE TIME WAS CAUSED BY A MALFUNCTION OF THE BALL MILL.
                         THIS RESULTED IN A LOSS OF  LIMESTONE  SUPPLY IN THE STORAGE TANK.

                         A  LEAK IN THE FEED WATER  LINE CAUSED  ADDITIONAL OUTAGE TIME DURING THE
                         MONTH.

 8/80  SYSTEM      100.0       100.0       100.0       100.0                   744   744    744  77.7

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         NO PROBLEMS WERE ENCOUNTERED  DURING THE MONTH OF AUGUST.

 9/80  SYSTEM       99.2        99.6        99.6        99.2                   720   717    714  70.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING SEPTEMBER THE SCRUBBER WAS  INSPECTED CAUSING TWO HOURS OF
                         OUTAGE TIME.

                         A BRIEF  FGD OUTAGE OF  12 MINUTES WAS  CAUSED BY AN  ELECTRICAL SHORT.

                         THE UNIT  AND FGD SYSTEM WERE  OUT OF SERVICE FOR APPROXIMATELY 3 1/2 HOURS
                         DUE TO ESP PROBLEMS.

10/80  SYSTEM      62.6        94.4        94.4        25.1                   744   198    187   18.0

       *« PROBLEMS/SOLUTIONS/COMMENTS

                         DURING OCTOBER  THE FGD SYSTEM WAS  OFF LINE FOR 278 HOURS SO THAT GENERAL
                         SYSTEM REPAIRS  COULD BE MADE.
                                             13-1072

-------
                                                 UTILITY  F6D  SURVEY:  OCTOBER  1983  -  SEPTEMBER  1984

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROW,  SR.  1  (CONT.)
	PERFORMANCE  DATA	
PERIOD  MODULE AVAILABILITY  OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD    CAP.
                                                                502  PART.  HOURS HOURS  HOURS  FACTOR

                         BOILER  TUBE  LEAKS  CAUSED A BOILER OUTAGE OF  38 HOURS  DURING  THE MONTH.

                         ESP PROBLEMS ENCOUNTERED IN OCTOBER CAUSED APPROXIMATELY 241 HOURS OF
                         OUTAGE  TIME.

11/80  SYSTEM       24.9       41.9        41.9        10.8                 720   185    78   20.6

       *# PROBLEMS/SOLUTIONS/COMMENTS

                         DURING  NOVEMBER THE FGD SYSTEM WAS SHUTDOWN  FOR APPROXIMATELY 516 HOURS TO
                         MAKE REPAIRS TO THE HASTELLOY G MATERIAL IN  THE SCRUBBER.

                         A  BOILER TUBE LEAK CAUSED ADDITIONAL OUTAGE  TIME DURING THE  MONTH.

12/80  SYSTEM       99.9       99.4        99.4        64.0                 744   479*   476   49.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING  DECEMBER A  FIRE IN THE BOILER CAUSED  TWO BALL  MILLS TO EXPLODE
                         RESULTING IN APPROXIMATELY 267 HOURS OF OUTAGE TIME.

                         A  DUCT  VOLTAGE TEST WAS CONDUCTED DURING DECEMBER.

 1/81  SYSTEM      100.0                                  .0                 744     0     0    .0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER REMAINED OUT SERVICE DUE TO A BALL MILL EXPLOSION.

 2/81  SYSTEM      100.0        91.5       100.0        11.5                 672   84    77   9.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER REMAINED OFF LINE  576 HOURS IN FEBRUARY DUE  TO THE MILL EXPLO-
                         SION.

 3/81  SYSTEM       86.0        80.3        80.3        26.8                 744   248   199   25.0

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH THE RECYCLE PUMPS TRIPPED CAUSING APPROXIMATELY A  HALF HOUR
                         OF OUTAGE TIME.

                         A  COMPUTER POWER FAILURE AND  AN INSPECTION CAUSED  AN  ADDITIONAL TWO HOUR
                         OUTAGE.

                         THE LIMESTONE BALL TUBE MILL NEEDED REPAIR DURING  MARCH.

 4/81  SYSTEM       49.7        94.1        33.6        26.3                  720   202    189   19.5

       ** PROSLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL THE FGD SYSTEM WAS UNAVAILABLE APPROXIMATELY 362 HOURS DUE
                         TO A LIMESTONE BALL MILL OUTLET SCREEN AND SCRUBBER DUCT INSPECTION.

 5/81  SYSTEM         .0                                   -0                  744     0      0     .0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING  MAY THE BOILER DID NOT OPERATE DUE TO SOME  NECESSARY REPAIR TO THE
                         SCRUSBER DUCTWORK.

                         AN EXPLOSION IN THE BALL TUBE MILL ALSO PREVENTED  OPERATIONS DURING THE
                         MONTH.
                                            13-1073

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROW, SR.  1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR


 6/81  SYSTEM      91.0        91.3         91.3         90.7                  720   715    653  76.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JUNE A BALL MILL  EXPLOSION AND REPAIRS TO THE DUCT WORK CAUSED 58
                         HOURS OF DOWN TIME.

                         A BALL TUSE MILL BEARING WAS  REPLACED CAUSING SIX HOURS OF DOWN TIME.

 7/61  SYSTEM     100.0        98.7         98.7         93.5                  744   705    696  77.9

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JULY, THE FGD  SYSTEM WAS AVAILABLE FOR OPERATION 100 PERCENT OF
                         THE TIME. THERE WERE  FOUR  MINOR UNIT OUTAGES DURING THE MONTH ATTRIBUTED
                         TO PROBLEMS WITH THE  BOILER.

 8/81  SYSTEM     100.0       100.0       100.0        100.0                  74*   744    744  83.1

 9/81  SYSTEM      99.4        99.0         99.0         98.2                  720   707    700  68.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE MONTH,  THERE  WAS A MINOR OUTAGE (11 HOURS) FOR REPAIR OF THE
                         PRIMARY AIR DUCT.

 10/81  SYSTEM      75.2        99.3         99.3         72.2                  744   541    538  51.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING OCTOBER  184 HOURS OF DOWN TIME WAS DUE TO AN INSPECTION OF THE
                         SCRUBBER DUCT.

                         A SUPERHEATER SECTION TUBE LEAK ACCOUNTED FOR APPROXIMATELY 22 HOURS OF
                         OUTAGE TIME.

 11/81  SYSTEM     100.0        99.4         99.4         98.0                  720   710    706  76.5

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING NOVEMBER THE RECYCLE PUMP TRIPPED CAUSING A MINOR OUTAGE.

                         A BOILER CONTROL CARD FAILURE CAUSED APPROXIMATELY FIVE HOURS OF DOWN TIME.

                         NINE HOURS OF OUTAGE TIME  WAS NECESSARY TO REPAIR THE FEED WATER VALVE.

 12/81  SYSTEM     100.0       100.0        100.0        100.0                  744   744    744  70.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING DECEMBER THE UTILITY REPORTED THAT NO FGD-RELATED PROBLEMS OCCURRED.

 1/82  SYSTEM     100.0        98.5         93.5         32.6                  744   246    242  22.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY, A  FROZEN DRUM LEVEL TRANSMITTER AND COLD REHEAT PIPING
                         CAUSED APPROXIMATELY 500 HOURS OF OUTAGE TIME.

 2/82  SYSTEM     100.0        99.8        100.0         99.8                  672   672    670  74.5

 3/82  SYSTEM       74.2        99.8         74.2         74.2                  744   553    552  58.4
                                             13-1074

-------
                                                  UTILITY FGO  SURVEY:  OCTOBER  1983 -  SEPTEMBER  1984

SOUTH MISSISSIPPI ELEC PUR: R.D.  MORROW,  SR.  1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY  OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD    CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR


      *« PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH APPROXIMATELY 192 HOURS OF OUTAGE TIME WAS DUE  TO  ABSORBER
                         DUCT LINING REPAIRS.

                         DURING THE FIRST QUARTER 1982 APPROXIMATELY 3 HOURS OF  DOWN  TIME WAS
                         CAUSED BY LOSS OF  BOILER SEAL AIR.

 4/82 SYSTEM         .0                                   .0                   720     0     0    .0

      «* PROBLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL THE UNIT AND SYSTEM WERE SHUT DOWN TO PERFORM ABSORBER  DUCT
                         REPAIRS.

 5/82 SYSTEM       44.1         94.7        94.7        43.9                   744   345    327  33.6

      *« PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MAY THE SYSTEM WAS SHUT DOWN FOR APPROXIMATELY 413 HOURS TO REPAIR
                         THE ABSORBER DUCTWORK LINING.

                         A  BREAK IN THE MIST ELIMINATOR PIPING CAUSED ABOUT ONE  HOUR  OF  OUTAGE TIME.

                         ADDITIONAL OUTAGE  TIME WAS DUE TO A MIST ELIMINATOR NOZZLE PROBLEM.

 6/82 SYSTEM      100.0        100.0       100.0       100.0                   720   720    720  79.0

      ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR  FGO-RELATED PROBLEMS WERE EXPERIENCED
                         DURING JUNE.

 7/82 SYSTEM       98.0         97.5        97.6        91.2                   744   696    678  78.3

      ** PROBLEMS/SOLUTIONS/COMMENTS

                         A  15 HOUR OUTAGE OCCURRED DURING JULY DUE TO A HOLE IN  A SLURRY STORAGE
                         TANK.

                         A  BOILER TUBE LEAK CAUSED A 51 HOUR OUTAGE DURING JULY.

 8/82  SYSTEM      100.0        100.0       100.0       100.0                   744   744    744  84.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR  FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING AUGUST.

 9/82 SYSTEM       99.9         99.9        99.9        99.9                   720   720    720  74.6

      ** PROBLEMS/SOLUTIONS/COMMENTS

                         A  30 MINUTE OUTAGE RESULTED FROM LOSS OF POWER TO THE SCRUBBER CONTROLS.

10/82 SYSTEM      76.1        100.0       100.0        76.1                   744   566    566  61.4

      ** PROBLEMS/SOLUTIONS/COMMENTS

                         A  177 HOUR OUTAGE OCCURRED DURING OCTOBER DUE TO AN INSPECTION OF DUCTWORK.

11/82 SYSTEM       99.9         99.9        99.9        99.9                  720   720    720  71.6
                                            13-1075

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER  198*

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROW, SR.  1  tCONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A LOSS OF WATER  TO  THE  MIST ELIMINATOR SECTION PRODUCED A 25 MINUTE OUTAGE
                         DURING NOVEMBER.

12/82  SYSTEM      100.0        100.0       100.0        100.0                  744   744    744  76.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED  THAT  NO  MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING DECEMBER.

  1/83  SYSTEM       97.0        97.8        96.9         96.0                  744   731    714  73.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD  SYSTEM WAS  OUT  OF  SERVICE  FOR APPROXIMATELY 23 HOURS DURING JANUARY
                         DUE TO A PLUGGING PROBLEM  IN  THE DEMIST SECTION.

                         A 7 HOUR OUTAGE  OCCURRED DURING THE MONTH AS A RESULT OF BOILLR AND TURBINE
                         PROBLEMS.

  2/83  SYSTEM       48.0        97.6        48.0         48.0                  672   330    322  32.2

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         APPROXIMATELY 350 HOURS OF DOWN TIME RESULTED FROM WORK BEING DONE ON THE
                         DUCTWORK OF THE  FGD SYSTEM.

                         RECYCLE  PUMP PROBLEMS ALSO CONTRIBUTED TO THE OUTAGE TIME DURING FEBRUARY.

  3/83  SYSTEM       95.9        95.9        95.9         95.9                  744   744    714  81.4

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         A  LOSS OF POWER  TO  THE  FGD SYSTEM  PRODUCED AN 11 HOUR OUTAGE DURING MARCH.

                         THE FAILURE OF A LIMESTONE MILL TO PRODUCE SUFFICIENT SLURRY RESULTED IN
                         APPROXIMATELY 19 HOURS  OF  DOWN TIME FOR THE FGD SYSTEM DURING MARCH.  A
                         POOR  GRADE OF  LIMESTONE WAS REPORTED AS THE REASON FOR FAILURE.

  4/83  SYSTEM      100.0        99.0        100.0         93.0                  720   677    670  63.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED  A  UNIT OUTAGE DURING APRIL LASTING 50 HOURS AND 26
                         MINUTES. THE OUTAGE  WAS DUE  TO BOILER-RELATED PROBLEMS.

  5/83  SYSTEM      100.0        99.7        100.0         99.6                  744   744    741  69.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD  SYSTEM WAS  OFF-LINE FOR 1.7 HOUR DURING MAY DUE TO
                         BOILER  PRESSURE  EXCURSION.

                         A  BRIEF  1.7 HOUR OUTAGE DURING THE MONTH OCCURRED DUE TO THE
                         CHANGING OF TAPS ON THE UNIT'S MAIN TRANSFORMER.

  6/83  SYSTEM      100.0        100.0        100.0        100.0                  720   720    720  73.0
                                             13-1076

-------
                                                 UTILITY  F6D  SURVEY:  OCTOBER  1983  -  SEPTEMBER

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROW,  SR.  1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD    CAP.
                                                                S02  PART.  HOURS HOURS  HOURS  FACTOR


      ** PROBLEMS/SOLUTIONS/COMMENTS

                        THE UTILITY REPORTED  THAT NO  MAJOR FGD-RELATED  PROBLEMS WERE  ENCOUNTERED
                        DURING  JUNE.

 7/83 SYSTEM     100.0        100.0       100.0       100.0                  744   744    744

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        THE UTILITY REPORTED  THAT NO  MAJOR FGD-RELATED  PROBLEMS WERE  ENCOUNTERED
                        DURING  JULY.

 8/83 SYSTEM     100.0        99.7       100.0        99.3                  744   741    739

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        THE UNIT WAS DOWN  APPROXIMATELY 3 HOURS DURING  AUGUST DUE  TO  ELECTRICAL
                        PROBLEMS NOT RELATED  TO THE FGD SYSTEM.

 9/83 SYSTEM     100.0        100.0       100.0       100.0                  720   720    720

      »* PROBLEMS/SOLUTIONS/COMMENTS

                        THE UTILITY REPORTED  THAT NO  MAJOR FGD-RELATED  PROBLEMS WERE  ENCOUNTERED
                        DURING  SEPTEMBER.

10/83 SYSTEM       40.8        99.3         40.8        40.8                  744   305    303

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        THE UNIT WAS OFF LINE APPROXIMATELY 441 HOURS DURING OCTOBER  FOR ABSORBER
                        DUCT  WORK REPAIRS.

11/83 SYSTEM     100.0        100.0        100.0       100.0                  720   720    720

      *« PROBLEMS/SOLUTIONS/COMMENTS

                        THE UTILITY REPORTED  THAT NO  MAJOR FGD-RELATED  PROBLEMS WERE  ENCOUNTERED
                        DURING  NOVEMBER 1983.

12/83 SYSTEM       91.2        87.3         80.7        68.8                  744   587    512

      *» PROBLEMS/SOLUTIONS/COtlMENTS

                        THE UNIT WAS OFF LINE APPROXIMATELY 157 HOURS DURING DECEMBER DUE TO  BOILER
                        RELATED PROBLEMS.

                        THE FGD SYSTEM WAS OUT OF SERVICE APPROXIMATELY 65 HOURS DURING DECEMBER
                        DUE TO  FROZEN  LIMESTONE.

 1/84 SYSTEM     100.0        100.0        100.0       100.0                  744   744    744

 2/84 SYSTEM     100.0        100.0        100.0       100.0                  696   696    696

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        NO MAJOR FGD-RELATED  PROBLEMS WERE REPORTED DURING JANUARY AND FEBRUARY.

 3/84 SYSTEM     100.0        100.0        100.0        22.4                  744   166    166
                                            13-1077

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROW, SR. 1  (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   X  REMOVAL   PER   BOILER   FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF LINE 24 DAYS FOR MAINTENANCE AND  ACID  CLEANING.

 4/84  SYSTEM     100.0        99.7       100.0        95.5                   720   690   688

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE ABSORBER WAS OFF FOR 32 HOURS DUE TO  BOILER  TUBE LEAKS.

 5/84  SYSTEM     100.0        99.6       100.0        95.9                   744   716   713

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE ABSORBER WAS OFF 1.25 DAYS DURING MAY DUE TO BOILER RELATED  PROBLEMS.

 6/84  SYSTEM     100.0        99.7       100.0        95.5                   720   690   688

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF LINE 30 HOURS DUE TO A SUPERHEAT  TUBE  LEAK  IN THE BOILER.

 7/84  SYSTEM     100.0        99.8       100.0        93.7                   744   698   697

       »* PROBLEMS/SOLUTIONS/COKMENTS

                         THE UNIT WAS OFF LINE 45 HOURS BECAUSE  OF A  BOILER TUBE LEAK.

 8/84  SYSTEM                                                                 744

 9/84  SYSTEM                                                                 7ZO

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR AUGUST  AND SEPTEMBER 1984.
                                             13-1070

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
              DESIGN AND  PERFORMANCE DATA FOR OPERATIONAL DOMESTIC F6D SYSTEMS
COMPANY NAME
PUNT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION  LIMITATION - NG/J
S02 EMISSION  LIMITATION - NG/J
NOX EMISSION  LIMITATION - NG/J
NET PLANT GENERATING  CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY M/FGD - MW
NET UNIT GENERATING CAPACITY UO/FGD - MM
EQUIVALENT SCRUBBED CAPACITY - MW

 *» UHIT DATA -  BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER  FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS  TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 »* FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE  HEAT CONTENT - J/G
     RAN3E HEAT  CONTENT - BTU/LB
     AVERAGE  ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE  MOISTURE CONTENT - '/.
     RAN3E MOISTURE CONTENT - 7.
     AVERAGE  SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE  CHLCPIOE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

«»* PARTICLE  CONTROL

 *» MECHANICAL COLLECTOR
     NUMBER
     TYPE

 ** ESP
     NUMBER
     NUMBER OF SPARES
     TYPE
     SUPPLIER  -
     INLET FLUE  GAS CAPACITY - CU.M/S
     INLET FLUE  GAS TEMPERATURE - C
     PRESSURE DROP  -  KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 *» PARTICLE  SCRUBBER
     NUMBER
     GENERIC  TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC  MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC  MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*** FGD SYSTEM
SOUTH MISSISSIPPI ELEC PMR
R.O. MORROW, SR.
Z
PURVIS
MISSISSIPPI
D
   43.         (
  516.         (
  301.         (
  400
  200
  190
  195
                  .100 LB/MMBTU)
                 1.200 LB/MMBTU)
                  .700 LB/MMBTU)
RILEY STOKER
PULVERIZED COAL
BASE
  335.76       (
  132.2
  122.
CONCRETE
    3.3        ( 10.7 FT)
                 711500 ACFM)
               ( 270 F)
               ( 400 FT)
COAL
BITUMINOUS
28493.

   10.00
8.0-12.0
    6.50
6.0-7
    1
               ( 12250 BTU/LB)
                11500-12500
      0
      64
1.0-1.8
     .12
0.10-0.13
 0
NONE
 1
 0
HOT SIDE
BUELL DIVISION, ENVIROTECH
  579.5        (1228000 ACFM)
  426.7        (  800 F)
     .1        (  0. IN-H20)
   99.6
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                            13-1079

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROW, SR. 2 (CONT.)
 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 #* DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X
     DESIGN COAL HEAT CONTENT - J/G
     DESIGN COAL ASH CONTENT - X
     DESIGN MOISTURE CONTENT - X
     DESIGN CHLORIDE CONTENT - 7.
     OPER. & MAINT. REQUIREMENT - MANHR/DAY

 ** QUENCHER/PRESATURATOR

 »* ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE -  LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X
     PARTICLE REMOVAL EFFICENCY - X

 »* MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUM3ER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     MANUFACTURER
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     DISTANCE BETUEEN STAGES - CM
     DISTANCE BETWEEN VANES - CM
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIMESTONE
 NONE
 ENVIRONEERING, RILEY STOKER
 BURNS * MCDONNELL
 FULL SCALE
 NEW
X   99.60
    85.00
     2.5
  1
  6/79
  6/79
  5/75
                (  12000 BTU/LB)
    1.30
27912.0
   15.00
    6.50
     .01
   88.0
  1
  0
 PACKED TOWER
 ROD DECK
 VENTRI-SORBER
 ENVIRONEERING,
 51.5 WIDE X 47.7
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC; HIGH ALLOY
 SYNTHETIC RUBBER; NICKEL BASE/CHROMIUM-IRON-MOLY
 CHLOROBUTYL; HASTELLOY c-276
 ROD DECKS
               RILEY STOKER
                 HIGH X 22.0 DEEP
  4
  1260.
     6.0
     2.0
     3.0
   208.58
   132.2
    85.0
       .0
               (20000 GPM)
               ( 45.2 GAL/1000 ACF)
               ( 8.0 IN-H20)
               ( 10.0 FT/S)
               ( 442000 ACFM)
               (  270 F)
 PRIMARY COLLECTOR
  1
  0
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 ENVIRONEERING
 VERTICAL
     2
     3
    91.44       (36.0
    53.3
      .9
 ORGANIC
 FIBER-REINFORCED POLYESTER
 SUPERNATANT FOR FIRST STAGE; MAKEUP FOR SECOND S
                     IN)
               (21.00 IN)
               ( 3.5 IN-H20)
                                             13-1080

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH MISSISSIPPI ELEC  PMR:  R.D.  MORROW,  SR.  2 (CONT.)
     WASH FREQUENCY
     WASH RATE  -  L/S

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE  NAME/COMMON TYPE
     PERCENT GAS  BYPASSED - AVG
     TEMPERATURE  INCREASE - C
     INLET  FLUE GAS FLOW RATE - CU.  M/S
     INLET  FLUE GAS TEMPERATURE - C
     OUTLET FLUE  GAS  TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC  TYPE

 ** FANS
     NUMBER
     NUMBER OF  SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS  FLOW  RATE - CU.M/S
     FLUE GAS  TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC  TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER  GENERIC  MATERIAL TYPE
     LINER  SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC  TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER  GENERIC  MATERIAL TYPE
     LINER  SPECIFIC MATERIAL TYPE

 »* DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC  TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER  GENERIC  MATERIAL TYPE
     LINER  SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC  TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER  GENERIC  MATERIAL TYPE
     LINER  SPECIFIC MATERIAL TYPE
INTERMITTENT
   15.8
BYPASS
COLD SIDE
N/A
   38.0
   28.9
  190.65
   52.2
   86.7
               (  250 GAL/MIN)
               (   52 F)
               ( 404000 ACFM)
               (  126 F)
               (  188 F)
CARBON STEEL; HIGH ALLOY
AISI 1110; NICKEL BASE/CHROMIUM-IRON-COPPER-MOLY
 Z
 0
CENTRIFUGAL
GREEN FAN
UNIT
FORCED DRAFT
DRY
  201.03
  148.9
CARBON STEEL
               t 426000 ACFM)
               (  300 F)
SHUT-OFF
LOUVER
PARALLEL BLADE MULTILOUVER
RILEY STOKER
CARBON STEEL
AISI 1110
NONE
N/A
SHUT-OFF
LOUVER
PARALLEL BLADE MULTILOUVER
RILEY STOKER
CARBON STEEL
AISI 1110
NONE
N/A
SHUT-OFF
LOUVER
PARALLEL BLADE MULTILOUVER
DAMPER DESIGN
HIGH ALLOY [SEALS!
NICKEL BASE/CHROMIUM-MOLYBDENUM-NICKEL-COPPER
ORGANIC
NATURAL RUBBER
CONTROL
LOUVER
PARALLEL BLADE MULTILOUVER
RILEY STOKER
CARBON STEEL
AISI 1110
NONE
N/A
                                            13-1081

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROW, SR. 2 (CONT.)
 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER
     NUMBER OF SPARES
     FULL  LOAD DRY FEED CAPACITY - M.TONS/HR
     PRODUCT QUALITY - X SOLIDS

 ** TANKS
     SERVICE
     REAGENT PREP PRODUCT
     ABSORBER RECYCLE
     MILL SUMP
     THICKENER SUPPLY SUMP
     THICKENER OVERFLOW
     ME WASH

  **  PUMPS
     SERVICE
      ABSOPBER RECIRCULATION
      SLU3RY  TRANSFER
      MILL  SLURRY
      ME  WASH
      CLEAR WATER TRANSFER  [SUPERNATANT!
      THICKENER UNDERFLOW

  »*  SOLIDS CONCENTRATING/DEWATERING
      DEVICE
      NUMBER
      NUMBER  OF SPARES
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE
      BELT  GENERIC MATERIAL TYPE
      BELT  SPECIFIC MATERIAL TYPE
      FEED  STREAM SOURCE
      FEED  STREAM CHARACTERISTICS
      OUTLET  STREAM CHARACTERISTICS
CONTROL
LOUVER
PARALLEL BLADE MULTILOUVER
RILEY STOKER
CARBON STEEL
AISI 1110
NONE
N/A
SCRUBBER INLET
RECTANGULAR
CARBON STEEL
AISI 1110
NONE
N/A
SCRUBBER OUTLET TO STACK
RECTANGULAR
CARBON STEEL
AISI 1110
HIGH ALLOY
NICKEL BASE/CHROMIUM-IRON-COPPER-MOLYBDENUM
WET BALL MILL
COMPARTMENTED
TUBE MILL
KENNEDY VAN SAUN
 1
 0
    7.3        (   8 TPH)
   35.0
NUMBER

   1
   1
   1
   1
   1
   1
NUMBER

   3
   2
   2
   2
   2
   2
VACUUM FILTER
 1
0
CARBON STEEL
AISI 1110
ORGANIC
EPOXY
ORGANIC
NYLON
THICKENER UNDERFLOW
40X SOLIDS
70X SOLIDS
                                            13-1082

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH MISSISSIPPI ELEC  PMR:  R.D.  MORROW,  SR.  2 (CONT.)
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

 «* SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF  SPARES
     DIMENSIONS - FT
     CAPACITY
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OVERFLOW  STREAM  CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW  STREAM  DISPOSITION
TO PUG MILL AND DISPOSAL
TO THICKENER
THICKENER
 1
0
60.0 DIA X 11.0
230000
CARBON STEEL
AISI 1110
ORGANIC
BITUMASTIC
ABSORBER BLEED
70-100 GPM PER UNIT, 15X SOLIDS
40X SOLIDS
<5X SOLIDS
TO VACUUM FILTER
TO MILL SLURRY TANK, ABSORBER ME TANK, AND RECYC
»*» SLUDGE
     FULL LOAD SLUDGE QUANTITY - M.TONS/HR (DRY)
     MOISTURE CONTENT - 7. TOTAL FREE WATER
     X CAS03 - DRY
     X CAS04 - DRY
     X CAOH2 - DRY
     X CAC03 - DRY
     X ASH - DRY
     X OTHER COMPOUNDS - DRY

 «* TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS
     INLET QUALITY - X

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT
     SITE DIMENSIONS
     SITE CAPACITY - CU.M
     SITE SERVICE LIFE - YRS

 »* PROCESS CONTROL AND INSTRUMENTATION
     PROCESS STREAM
     CHEMICAL PARAMETERS
     PHYSICAL VARIABLES
     CONTROL LEVELS
     MONITOR TYPE
     MONITOR LOCATION
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE

 ** WATER BALANCE
     WATER LOOP TYPE

 ** CHEMICALS AND CONSUMPTION
     FUNCTION
     NAME
     PRINCIPAL CONSTITUENT
     SOURCE/SUPPLIER
     CONSUMPTION
     UTILIZATION - X
     POINT OF ADDITION
    3.6
   20.0
   20.0
   70.0
    5.0
    5.0
    5.0
4.0 TPH)
    1.0
FIXATION
PUG MILL
NONE
   70.0
FINAL
LAW FILL
ON-SITE
TRUCK/CONVEYED
CLAY LINING  INATURAL!
13 ACRES X 30 FEET
    476970      (   390.0 ACRE-FT)
  6
ABSORBER RECYCLE, FLUE GAS
PH, S02
DENSITY, FLOW
PH 5.4-5.6, S02  - 1.2 LB/MM BTU
L * N, LEAR SIEGLER
RECYCLE TANK/INLET DUCT
AUTOMATIC
FEEDBACK
CLOSED
ABSORBENT
LIMESTONE
>85X  CAC03
CALERA  QUARRY
70  TONS/DAY  12  UNITS AT FULL LOAD!
    80.0
BALL  MILL
                                            13-1083

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROW, SR. 2  (CONT.)
 ** FGD SPARE CAPACITY INDICES
     ABSORBER - X                                     -0
     MIST ELIMINATOR - X                              .0
     FAN - X                                          .0
     BALL MILL - X                                    .0
     THICKENER - X                                    .0
     VACUUM FILTER - X                                .0

 ** FGD SPARE COMPONENT INDICES
     ABSORBER                                         .0
     MIST ELIMINATOR                                  .0
     FAN                                              .0
     BALL MILL                                        .0
     THICKENER                                        .0
     VACUUM FILTER                                    .0
 	PERFORMANCE  DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER   BOILER   FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR


  6/79  SYSTEM                                                                 720

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         R.D. MORROW Z BEGAN  SCRUBBER  OPERATIONS IN  THE UTTER PART OF JUNE.  OPERA-
                         TIONAL DATA ARE NOT  YET  AVAILABLE.

  7/79  SYSTEM                                                                 744

  8/79  SYSTEM                                                                 744

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         NO  INFORMATION WAS AVAILABLE  FOR THE JULY-AUGUST 1979 PERIOD.

  9/79  SYSTEM        4.7       100.0         4.7         4.7                   720    34     34   2.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING SEPTEMBER THE UNIT  WAS TAKEN OFF LINE DUE TO FAILURE OF  LINERS AND
                         PLUGGING  IN THE MIST ELIMINATOR SECTIONS.

 10/79  SYSTEM         .0                       .0          .0                   744   477     0  52.5

 11/79  SYSTEM         .0                       .0          .0                   720           0

 12/79  SYSTEM         .0                       .0          .0                   744           0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCRUBBER HAS REMAINED  OFF LINE  THROUGH  THE REPORT PERIOD DUE TO THE
                         LINING FAILURES.  RELINING SHOULD BE COMPLETED AND THE  UNIT ON  SHOULD BE
                         BACK ON  LINE IN MAY.

  1/80  SYSTEM         .0                       .0          .0                   744   743     0  75.4

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT  REMAINED OFF LINE DURING JANUARY WHILE SCRUBBER LINER  REPAIRS
                         CONTINUED.

                         THE PRESATURATOR AREAS,  BYPASS DUCTS, AND THE SECTIONS  OF DUCT  FROM
                         ABSORBER  EXITS AT POINTS WHERE BYPASSED GAS MIXES WITH  WET GAS  ALL THE
                         WAY TO THE STACK ARE BEING LINED WITH HASTELLOY G (A 1/8 INCH LINING  IS
                         BEING WELDED TO THE  EXISTING  CARBON STEEL).
                         THE MAIN  BODY OF THE ABSORBER MODULES IMMEDIATELY ABOVE THE PRESATURATOR
                         SECTIONS  ALL THE WAY TO  THE ABSORBER EXIT IS BEING LINED WITH CHLOROBUTYL
                                             13-1084

-------
                                                 UTILITY  FGD SURVEY: OCTOBER  1983  - SEPTEMBER 1984

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROMi SR.  2  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION   X  REMOVAL    PER   BOILER   FGD   CAP.
                                                                S02   PART. HOURS  HOURS  HOURS  FACTOR

2/80 SYSTEM
3/80 SYSTEM
4/80 SYSTEM
RUBBER (ON THE
.0 .0
.0 .0
.0
EXISTING CARBON STEEL).
.0 .0
.0 .0
.0

696 698
744 486
720 0

0 75.0
0
0 .0
       **  PROBLEMS/SOLUTIONS/COMMENTS

                        THE  FGD  SYSTEM REMAINED  OFF  LINE  THROUGH  APRIL  AS  SCRUBBER  LINER REPAIRS
                        CONTINUED.  THE UNIT IS  EXPECTED  BACK  ON  LINE AT THE  END OF MAY.

 5/80  SYSTEM       2.4         14.2         14.2          2.4                  744   127     18

       »*  PROBLEMS/SOLUTIONS/COMMENTS

                        THE  UNIT REMAINED  OFF LINE DURING MOST OF MAY TO COMPLETE SCRUBBER AND
                        STACK  LINING  MODIFICATIONS.

                        THE  BOILER  OPERATED  127  HOURS  IN  MAY;  HOWEVER,  THE FGD SYSTEM OPERATED
                        ONLY 18  HOURS BECAUSE OF COMPUTER CONTROL PROBLEMS.

 6/80  SYSTEM       99.3         90.0         99.1         78.0                  720   625    561  68.9

       **  PR03LEMS/SOLUTIONS/COMMENTS

                        THE  FGD  SYSTEM COMPUTER  LOST POWER  DURING JUNE  CAUSING THE  UNIT TO
                        BE SHUT  DOWN  FOR 25  MINUTES.

                        DURING JUNE OPERATIONS CAME  TO A  HAULT FOR APPROXIMATELY FIVE HOURS TO
                        CLEAN  THE MIST ELIMINATORS.  OTHER  OUTAGE TIME  DURING THE MONTH WAS CAUSED
                        BY BOILER RELATED  PROBLEMS.

 7/80  SYSTEM       79.8         80.7         80.7        79.8                  744   736    594  73.8

       **  PROBLEMS/SOLUTIONS/COMMENTS

                        DURING JULY BALL MILL REPAIRS  ACCOUNTED FOR THE MAJOR PORTION OF THE  FGD-
                        RELATED  OUTAGE TIME.

                        THE  SCRUBBER  WAS INSPECTED FOR SCALE ACCUMULATION  AND A TRIP TEST WAS
                        CO^UCTED ON  THE SCRUBBER CONTROLS  TO  CHECK ON  EARLIER MODIFICATIONS.

                        THE  SCRUBBING SYSTEM WENT OFF  LINE  DUE TO AN ALARM TRIGGERED BY HIGH
                        TEMPERATURE,  WHICH WAS DETERMINED TO BE A FALSE ALARM.

                        A POSSIBLE  TUBE LEAK SHUT THE  BOILER DOWN ON JULY  27. THE  UNIT WENT  BACK
                        ON LINE  WITHOUT FINDING  THE  LEAK.  THE BOILER WAS  THEN TAKEN OFF  LINE ON
                        JULY 28  TO  FIND THE  LEAK AND MAKE THE  NECESSARY REPAIRS.

                        PROBLEMS WITH THE  BURNER MANAGEMENT CONTROL SYSTEM ALSO CAUSED A  BOILER-
                        RELATED  OUTAGE.

 8/80  SYSTEM       98.8         99.5         99.5         98.8                  744   739     735  74.3

       **  PROBLEMS/SOLUTIONS/COMMENTS

                        THE  BOILER  WAS OUT OF SERVICE  APPROXIMATELY FIVE HOURS DURING AUGUST  DUE
                        TO A BOILER TUBE LEAK.

                        AFTER  THE REPAIRS  TO THE BOILER TUBE AN ADDITIONAL FOUR HOURS OF  OUTAGE
                        TIME WAS NECESSARY TO START  UP THE  FGD SYSTEM.

 9/80  SYSTEM       99.8         99.5         99.5         88.3                  720   639     636  62.4
                                            13-1085

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER  1984

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROW, SR.  Z  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  F6D   CAP.
                                                                 SOS  PART.  HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING SEPTEMBER THE  BOILER WAS TAKEN OUT OF SERVICE FOR APPROXIMATELY
                         83 HOURS DUE TO A  TUBE  LEAK.

                         A BOILER INSPECTION AND AN ELECTRICAL SHORT IN THE CONTROLS CAUSED THE
                         FGD  SYSTEM  TO SHUT DOWN WITH  THE BOILER FOR APPROXIMATELY 1 1/2 HOURS.

10/80  SYSTEM       79.8        98.9         98.9         79.5                  744   598    591  68.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         PITTING OF  THE HASTELLOY 6 MATERIAL IN THE SCRUBBER MAS DETECTED DURING A
                         SCRUBBER INSPECTION.

                         DUPING OCTOBER FURNACE  DRAFT  PROBLEMS ACCOUNTED FOR APPROXIMATELY FOUR
                         HOURS OF DOWN TIME.

11/80  SYSTEM       80.2        95.3         95.3         74.8                  720   565    538  67.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING NOVEMBER THE FGD SYSTEM WAS OFF LINE APPROXIMATELY 131 HOURS TO
                         REPAIR DUCTWORK.

                         AN ADDITIONAL 8 HOURS OF OUTAGE TIME WAS REQUIRED  FOR NOZZLE CLEANING.

12/80  SYSTEM       49.7        92.7         92.7         49.7                  744   399        39.6

       ** PROBLEMS/SOLUTIOHS/COMMENTS

                         DURING DECEMBER REPAIRS TO THE SCRUBBER DUCT CAUSED APPROXIMATELY 348 HOURS
                         OF DOWN TIME.

                         THE  RECYCLE NOZZLES PLUGGED CAUSING THE SYSTEM TO  SHUTDOWN FOR APPROXIMATE-
                          LY 24 HOURS.

                         A ONE HOUR  OUTAGE  WAS CAUSED  BY A MODULE HIGH TEMPERATURE ALARM.

  1/81  SYSTEM       89.4        97.6         97.6         87.2                  744   665    649  86.5

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  BOILER  WAS OUT OF SERVICE APPROXIMATELY 79 HOURS DURING JANUARY DUE TO
                         A BOILER TUBE  LEAK.

                         ADDITIONAL  OUTAGE  TIME  WAS DUE TO THE REPAIRING OF THE MIST ELIMINATOR
                         DRAIN PIPING.

                         THE  SYSTEM  WAS UNAVAILABLE APPROXIMATELY TWO HOURS DUE TO THE CLEANING OF
                         THE  RECYCLE NOZZLES.

                         THE  LIMESTONE MAKE-UP LINE BROKE CAUSING 12 HOURS  OF ADDITIONAL OUTAGE
                         TIME.

  2/81  SYSTEM      100.0        99.9        100.0         85.6                  672   576    575   74.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS
                         WERE ENCOUNTERED.

  3/81  SYSTEM       85.5        86.6         86.6         58.4                  744   502    434  49.5
                                             13-1086

-------
                                                 UTILITY  FGD  SURVEY:  OCTOBER  1983  -  SEPTEMBER  1984

SOUTH MISSISSIPPI ELEC PMR: R.D. MORROW,  SR.  Z  (CONT.)
	PERFORMANCE DATA	
PERIOD  MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD    CAP.
                                                                S02   PART.  HOURS HOURS  HOURS  FACTOR


       «*  PROBLEMS/SOLUTIONS/COMMENTS

                        DURING MARCH THE FGD SYSTEM MAS OUT OF SERVICE APPROXIMATELY THREE HOURS
                        TO  CLEAN THE RECYCLE NOZZLES.

                        AN  ADDITIONAL TWO  HOURS OF OUTAGE TIME WAS  DUE TO  A LEAK IN THE SLURRY
                        SUPPLY PIPING.

                        THE FGD SYSTEM WAS OUT OF SERVICE APPROXIMATELY 102 HOURS DUE TO REPAIRS
                        TO  THE LIMESTONE BALL MILL.

 4/81  SYSTEM       99.5        98.0        99.5        87.1                  720   6*0    627   71.5

       »*  PROBLEMS/SOLUTIONS/COMMENTS

                        OURINS APRIL THE BOILER WAS OUT OF SERVICE  APPROXIMATELY 80 HOURS DUE TO
                        A SUPERHEATER TUBE LEAK.

                        SOME MINOR OUTAGES ENCOUNTERED DURING THE MONTH INCLUDED A RECYCLE PUMP
                        TRIP, A LOOSE CONNECTION ON A TEMPERATURE PROBE AND A SCRUBBER  INSPECTION.

 5/81  SYSTEM      100.0        99.1       100.0        93.1                  744   699    693   77.4

       **  PROBLEMS/SOLUTIONS/COMMENTS

                        DUE TO A TUBE LEAK IN THE SUPERHEAT AND REHEAT SECTIONS, THE SYSTEM WAS
                        OFF LINE 45 HOURS  IN MAY.

                        ADDITIONAL OUTAGE  TIME WAS CAUSED BY A TURBINE TRIP.

 6/81  SYSTEM       97.8        97.3        97.3        97.0                  720   718    699   99.7

       *»  PROBLEMS/SOLUTIONS/COMMENTS

                        DURING JUNE TWO OUTAGE CAUSED BY THE BALL MILL. ON ONE OCCASION A BEARING
                        HAD TO BE REPLACED AND ANOTHER TIME WAS FOR GENERAL REPAIRS.

                        TEN HOURS OF DOWN  TIME WAS CAUSED BY PROBLEMS WITH THE CONTROL  CIRCUIT IN
                        THE ESP.

 7/81  SYSTEM      100.0        97.1        99.6        93.4                  744   716    695   80.9

       **  PROBLEMS/SOLUTIONS/COMMENTS

                        DURING JULY, TWO UNIT OUTAGES TOTALLING 48  HOURS OCCURRED. THERE WERE NO
                         FGD RELATED PROBLEMS REPORTED.

 8/81  SYSTEM      100.0        99.9       100.0        96.4                  744   718    717   82.1

       »*  PROBLEMS/SOLUTIONS/COMMENTS

                        DURING AUGUST, BOILER TUBE LEAKS CAUSED A 25 HOUR  UNIT OUTAGE.

 9/81  SYSTEM       98.1        98.1        98.1        98.1                  720   720    706   75.4

       **  PROBLEMS/SOLUTIONS/COMMENTS

                        THERE WERE NO FGD  RELATED PROBLEMS ENCOUNTERED DURING THE MONTH OF
                        SEPTEMBER.

10/81  SYSTEM       99.9        99.9        99.9        99.9                  744   744    743  67.5
                                            13-1087

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROW, SR. 2  (CONT.)
	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A PLANNED OUTAGE FOR GENERAL REPAIRS ACCOUNTED FOR APPROXIMATELY ONE HALF
                         HOUR DOWNTIME DURING OCTOBER.

11/81  SYSTEM      32.4        98.8         98.8         32.3                   720   236    233  19.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING NOVEMBER 486 HOURS OF OUTAGE  TIME WAS DUE TO EXPANSION JOINT AND
                         RECYCLE TANK REPAIRS.

                         PROBLEMS WERE ALSO ENCOUNTERED WITH  THE ESP.

12/81  SYSTEM      100.0        99.1         99.1         93.6                   744   702    696  63.1

       ** PRCBLEMS/SOLUTIONS/COMMENTS

                         DURING DECEMBER THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS
                         OCCURRED.

  1/82  SYSTEM      98.7        98.7         98.7         91.9                   744   693    684  72.6

       #* PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY THE RECYCLE PUMP  TRIPPED THREE TIMES AMOUNTING TO ABOUT
                         4 HOURS OF  OUTAGE  TIME.

                         A REHEATER  TUBE LEAK AMOUNTED  TO APPROXIMATELY 41 HOURS OF DOWNTIME.

                         THE  FLUSH VALVE FOR THE  RECYCLE  PUMP WAS REPLACED DURING THE MONTH.

                         THE  DRUM LEVEL TRANSMITTER SIGNAL WAS UNOPERABLE FOR 10 HOURS IN
                         JANUARY DUE TO COLD WEATHER.

  2/82  SYSTEM      23.4        99.8         23.4         23.4                   672   157    157  15.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY THE FGD  SYSTEM WAS DOWN FOR 515 HOURS FOR RELINING OF THE
                         RECYCLE TANK AND DUCT  LINING REPAIRS.

  3/82  SYSTEM      28.2        97.1         28.2         28.2                   744   216    209  21.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  DUCTWORK REPAIRS STARTED IN  FEBRUARY CONTINUED INTO MARCH.

  4/82  SYSTEM      99.9        99.9         99.9         99.9                   720   720    719

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL TWO OUTAGES OCCURRED WHICH SHUT THE SYSTEM DOWN FOR APPROX-
                         IMATELY ONE HALF HOUR.   ONE OUTAGE WAS DUE  TO A LOSS OF POWER SUPPLY  AND
                         THE  OTHER OUTAGE WAS CAUSED BY A RECYCLE PUMP TRIP.

  5/82  SYSTEM      99.9        99.2         99.2         86.6                   744   650    645  65.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MAY  THE UNIT WAS  OFF-LINE FOR 27 MINUTES DUE TO AN ELECTRICAL
                         SWITCHING PROBLEM.
                                             13-1088

-------
                                                  UTILITY  F60  SURVEY:  OCTOBER  1983 - SFPTEMBER  1984

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROW,  SR.  2  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD    CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR

                         PROBLEMS  WERE  ENCOUNTERED WITH THE BOILER FEED PUMP CONTROLS.

                         DURING THE  MONTH THE TURBINE  SCREENS HAD TO BE REMOVED.

 6/82 SYSTEM      100.0        100.0       100.0       100.0                  720   720    720  63.7

      ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED THAT NO  MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING JUNE.

 7/82 SYSTEM       96.5         96.2         96.2        96.0                  744   743    715  85.2

      ** PROBLEMS/SOLUTIONS/COMMENTS

                         A  3  HOUR  OUTAGE RESULTED FROM BOILER-RELATED PROBLEMS DURING JULY.

                         THE  SCRUBBER WAS OUT OF SERVICE FOR 26 HOURS DURING THE MONTH AS A RESULT
                         OF A HOLE IN A SLURRY STORAGE TANK.

 8/82 SYSTEM      100.0        100.0        100.0       100.0                  744   744    744  83.1

      ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED THAT NO  MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING AUGUST.

 9/82 SYSTEM       98.5         98.5        98.5        98.5                  720   720    709  75.3

      ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  SCRUBBER WAS DOWN FOR 11  HOURS DURING SEPTEMBER DUE TO STACK MONITORING
                         TESTS.

 10/82 SYSTEM       71.9         99.1        99.1        71.6                  744   537    532  57.7

      *» FROBLEMS/SOLUTIONS/COMMENTS

                         A  214 HOUR OUTAGE  OCCURRED DURING OCTOBER DUE TO AN INSPECTION  OF DUCTWORK.

                         A  32 HOUR OUTAGE RESULTED FROM A BOILER TUBE RUPTURE.

 11/82 SYSTEM      100.0         99.0        99.0        89.8                  720   653    647  63.3

      ** PROBLEMS/SOLUTIONS/COMMENTS

                         A  73 HOUR OUTAGE OCCURRED DURING NOVEMBER DUE TO BOILER TUBE LEAKS.

 12/82 SYSTEM       77.6         99.4        99.9        77.6                  744   581    578  57.1

      ** PROBLEMS/SOLUTIONS/COMMENTS

                         AN OUTAGE LASTING 166 HOURS OCCURRED DURING DECEMBER DUE TO BOILER  REPAIR
                         WORK.

                         A  25 MINUTE OUTAGE RESULTED FROM A POWER FAILURE TO THE FGD SYSTEM.

 1/83 SYSTEM      100.0        100.0       100.0        95.0                  744   713    707  72.4

      ** PROBLEMS/SOLUTIONS/COMMENTS

                         BOILER AND TURBINE PROBLEMS WERE EXPERIENCED DURING JANUARY.

 2/83 SYSTEM       85.6        100.0        85.6        85.6                  672   575    575  63.4
                                            13-1089

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROW, SR. 2  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  V. REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMEKTS

                         DUCTWORK REPAIRS CAUSED A 97  HOUR OUTAGE FOR THE F6D SYSTEM IN FEBRUARY.

                         PROBLEMS WITH A RECYCLE TANK  ALSO CONTRIBUTED TO THE DOWN TIME DURING
                         FEBRUARY.

 3/83  SYSTEM      44.3        95.5        40.6         38.1                   744   297    284  25.2

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A BOILER TUBE LEAK  PRODUCED 46 HOURS  OF DOWN TIME  FOR THE UNIT DURING THE
                         MONTH.

                         APPROXIMATELY 401 HOURS OF DOWN TIME  OCCURRED DURING MARCH AS A RESULT OF
                         REPAIRS BEING MADE  ON DUCTWORK.

                         DUE TO A POOR GRADE OF LIMESTONE, A LIMESTONE MILL FAILED TO GRIND A PROPER
                         AMOUNT OF THE MATERIAL.  APPROXIMATELY  14 HOURS OF OUTAGE TIME RESULTED.

 4/83  SYSTEM      100.0        99.2       100.0         87.9                   720   638    633  57.8

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF-LINE FOR 86.8 HOURS  DURING APRIL  TO WORK ON
                         A PRECIPITATOR.

 5/83  SYSTEM      100.0        100.0       100.0        100.0                   744   744    744  70.6

 6/83  SYSTEM      100.0        100.0       100.0        100.0                   720   720    720  72.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO  MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING MAY  AND  JUNE, 1983.

 7/83  SYSTEM      100.0        100.0       100.0        100.0                   744   744    744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO  MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING JULY.

 8/83  SYSTEM      100.0        100.0       100.0         90.9                   744   676    676

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN APPROXIMATELY 2 HOURS DURING AUGUST DUE TO PROBLEMS WITH
                         THE TURBINE HYDRAULIC OIL.

                         THE UNIT WAS DOWN APPROXIMATELY 65 HOURS DURING THE MONTH DUE TO RUPTURED
                         BOILER TUBING.

 9/83  SYSTEM      100.0        99.7       100.0         99.6                   720   719    717

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A BRIEF 1-HOUR  OUTAGE OCCURRED DURING SEPTEMBER DUE TO ELECTRICAL PROBLEMS
                         NOT RELATED TO  THE  FGD SYSTEM.

10/83  SYSTEM       61.4        100.0       100.0         61.4                   744   457    457
                                             13-1090

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER

SOUTH MISSISSIPPI ELEC PWR: R.D. MORROW, SR.  2  (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR


      ** PROBLEMS/SOLUTIONS/COMMENTS

                        THE UNIT  WAS OFF LINE APPROXIMATELY 287 HOURS DURING OCTOBER FOR
                        MAINTENANCE.

11/83 SYSTEM     100.0         99.5      100.0        94.2                  720   681    678

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        THE UNIT  WAS OFF LINE APPROXIMATELY 39 HOURS DURING NOVEMBER FOR BOILER  AND
                        DUCTWORK  REPAIRS.

12/83 SYSTEM       91.3         90.8        90.8        90.6                  744   742    674

      *» PROBLEMS/SOLUTIONS/COMMENTS

                        THE FGD SYSTEM WAS OUT OF SERVICE APPROXIMATELY 65 HOURS DURING DECEMBER
                        DUE TO FROZEN  LIMESTONE.

 1/84 SYSTEM     100.0         99.7      100.0        94.9                  744   708    706

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        THE UNIT  WAS DOWN  FOR REPAIR OF THE BOILER BURNER  FRONT AND PRECIPITATOR.

 2/84 SYSTEM     100.0        100.0      100.0       100.0                  696   696    696

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        NO MAJOR  FGD-RELATEDD PROBLEMS WERE REPORTED DURING FEBRUARY.

 3/84 SYSTEM     100.0        100.0      100.0        80.4                  744   598    593

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        THE UNIT  WAS OFF  LINE 6 DAYS FOR MAINTENANCE AND ACID CLEANING.

 4/84 SYSTEM     100.0         99.0      100.0        65.9                  720   479    475

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        THE ABSORBER WAS DOWN 9 DAYS FOR A SCHEDULED OUTAGE, A BOILER FEED PUMP
                        TRIP, AND FOR  REPAIR OF BOILER TUBE LEAKS.

 5/84 SYSTEM     100.0         99.9      100.0        99.4                  744   741    740

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        THE ABSORBER WAS DOWN 4 HOURS DUE TO A LACK Of VOLTAGE.

 6/84 SYSTEM       99.9         99.6        99.9        97.9                  720   708    705

      »* PROBLEMS/SOLUTIONS/COMMENTS

                        THE UNIT  WAS DOWN  12 HOURS DUE TO A WATER WALL TUBE LEAK AND A GENERATOR
                        VOLTAGE REGULATOR  PROBLEM. THE ABSORBER WAS DOWN 40 MINUTES DUE TO A POWER
                        LOSS.

 7/84 SYSTEM     100.0        100.0      100.0       100.0                  744   744    744
                                            13-1091

-------
UTILITY FGD SURVEY: OCTOBER 1933 - SEPTEMBER

SOUTH MISSISSIPPI ELEC PUR: P.O. MORROW, SR. 2 (CONT.)
	__	.	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED DURING JULY.

 8/8*  SYSTEM                                                                7**

 9/8*  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR AUGUST AND SEPTEMBER 198*.
                                            13-3092

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983  - SEPTEMBER
                                           SECTION 13
              DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGO SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION  LIMITATION - NG/J
S02 EMISSION LIMITATION  -  NG/J
NOX EMISSION LIMITATION  -  NG/J
NET PLANT GENERATING  CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGO - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 *» UNIT DATA  - BOILER AND STACK
    BOILER SUPPLIER
    BOILER TYPE
    BOILER SERVICE LOAD
    DESIGN BOILER FLUE  GAS FLOW - CU.M/S
    BOILER FLUE  GAS  TEMPERATURE - C
    STACK HEIGHT - M
    STACK SHELL
    STACK TOP DIAMETER  -  M

 ** FUEL DATA
    FUEL TYPE
    FUEL GRADE
    AVERAGE HEAT CONTENT  - J/G
    RANGE HEAT CONTENT  -  BTU/LB
    AVERAGE ASH  CONTENT - Y.
    RANGE ASH CONTENT - Y.
    AVERAGE MOISTURE CONTENT - Y.
    RANGE MOISTURE CONTENT - Y.
    AVERAGE SULFUR CONTENT - Y.
    RANGE SULFUR CONTENT  - Y.
    AVERAGE CHLORIDE CONTENT - Y.
    RANGE CHLORIDE CONTENT - Y.

*** PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
    NUMBER
    TYPE

 »* ESP
    NUMBER
    NUMBER OF SPARES
    TYPE
     SUPPLIER
     INLET  FLUE GAS CAPACITY - CU.M/S
     INLET  FLUE GAS TEMPERATURE - C
     PRESSURE  DROP  -  KPA
     PARTICLE  REMOVAL EFFICENCY - Y.

 ** PARTICLE SCRUBBER
    NUMBER
    GENERIC TYPE
    SPECIFIC  TYPE
    TRADE NAME/COMMON NAME
    SHELL GENERIC MATERIAL
    SHELL SPECIFIC MATERIAL
    LINER GENERIC MATERIAL
    LINER SPECIFIC MATERIAL
    GAS CONTACTING DEVICE TYPE

*** FGD SYSTEM
SOUTHERN ILLINOIS POWER
MARION
4
MARION
ILLINOIS
D
   43.         (  .100 LB/MMBTU)
  516.         ( 1.200 LB/MMBTU)
******         (****** LB/MMBTU)
  Z7Z
  184
  161
  165
  184
BABCOCK t WILCOX
CYCLONE
BASE
297.30 (
148.9 (
122. (
CONCRETE
6.4 (



630000 ACFM)
300 F)
400 FT)

21.0 FT)
COAL/REFUSE
BITUMINOUS
25586.          (  11000 BTU/LB)
                8500-11400
   16.80
7.5-23.0
   12.20
1.5-20.0
    3.75
2.9-4.4
      .10
0.00-0.12
 0
NONE
 1
 0
COLD SIDE
BABCOCK I WILCOX
  326.3        ( 691500 ACFM)
               (  300 F)
               (  1. IN-H20)
   148.9
      .1
    99.6
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                            13-1093

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTHERN ILLINOIS POWER: MARION $ (CONT.)
 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

  ** DESIGN AND OPERATING PARAMETERS

  ** QUENCHER/PRESATURATOR
     NUMBER
     TYPE
     SUPPLIER
     INLET GAS FLOW  - CU. M/S
     INLET GAS TEMPERATURE  - C
     LIQUID RECIRCULATION RATE  -  LITERS/S
     L/G RATIO -  L/CU. M
     CONSTRUCTION  MATERIAL  GENERIC TYPE
     CONSTRUCTION  MATERIAL  SPECIFIC  TYPE

  *» ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC  TYPE
     SPECIFIC  TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC  MATERIAL
     SHELL MATERIAL  TRADE NAME/COMMON TYPE
      LINER GENERIC MATERIAL
      LINER SPECIFIC  MATERIAL
      LINER MATERIAL  TRADE NAME/COMMON TYPE
     GAS CONTACTING  DEVICE  TYPE
     NUMBER OF CONTACTING ZONES
      LIQUID  RECIRCULATION RATE  -  LITER/S
      L/G RATIO -  L/CU.M
      GAS-SIDE PRESSURE DROP - KPA
      INLET  GAS FLOW -  CU. M/S
      INLET  GAS TEMPERATURE  - C
      502 REMOVAL  EFFICIENCY - X

  ** MIST ELIMINATOR
      PRE-MIST ELIMINATOR/MIST ELIMINATOR
      NUMBER  PER  SYSTEM
      NUMBER  OF SPARES  PER  SYSTEM
      NUMBER  PER  MODULE
      GENERIC  TYPE
      SPECIFIC TYPE
     TRADE  NAME/COMMON TYPE
     CONFIGURATION
     NUMBER  OF  STAGES
     NUMBER  OF  PASSES  PER  STAGE
     CONSTRUCTION MATERIAL  GENERIC TYPE
     CONSTRUCTION MATERIAL  SPECIFIC TYPE
     WASH  WATER  SOURCE
     WASH  FREQUENCY
   THROWAWAY PRODUCT
   WET SCRUBBING
   LIMESTONE
   NONE
   BABCOCK * WILCOX
   BURNS & MCDONNELL
   FULL SCALE
   NEW
- X     .00
      89.40
       2.2
    1
    6/79
    4/79
    1/76
    2
   VENTURI
   BABCOCK 4
     165.16
     148.9
     338.
       2.0
   CARBON STEEL
   AISI 1110
WILCOX
     (  350000 ACFM)
     (   300 F)
     (  5360 GPM)
     (  15.3 GAL/1000 ACFM)
    2
    0
   TRAY TOWER
   SIEVE TRAY
   N/A
   BABCOCK t WILCOX
   CARBON STEEL
   AISI 1110
   N/A
   ORGANIC
   GLASS FLAKE-FILLED POLYESTER
   RESISTA-FLAKE 1103
   SIEVE TRAYS
     827.
       5.9
       1.5
     139.68
      53.9
      89.4
     113120 GPM)
     ( 44.3 GAL/1000 ACF)
     ( 6.0 IN-H20)
     ( 296000 ACFM)
     (  129 F)
   PRIMARY COLLECTOR
    2
    0
    1
   IMPINGEMENT
   BAFFLE
   CLOSED VANE
   HORIZONTAL
        2
        3
   ORGANIC
   FIBER-REINFORCED POLYESTER
   BLENDED FOR UNDERSPRAY  AND  FRESH  FOR  OVERSPRAY
   CONTINUOUS UNDERSPRAY AND ONCE  PER  2  HOURS OVERS
                                             13-1094

-------
SOUTHERN ILLINOIS POWER: MARION 4 (CONT.)
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
 *» REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     PERCENT GAS BYPASSED  -  AVG
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 »» FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW  RATE  -  CU.M/S
     FLUE GAS TEMPERATURE  -  C
     CONSTRUCTION MATERIAL GENERIC TYPE

 »« CAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC  MATERIAL  TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC  MATERIAL  TYPE
     LINER SPECIFIC MATERIAL TYPE

 *» DAMPERS
     NUMSER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC  MATERIAL  TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION  EQUIPMENT
     FUNCTION
     DEVICE
NONE
N/A
N/A

NONE
N/A
     .0
               ( 350000 ACFM)
               (  300 F)
 2
 0
CENTRIFUGAL
BUFFALO FORGE
BOOSTER
FORCED DRAFT
DRY
  165.16
  146.9
CARBON STEEL
ISOLATION
GUILLOTINE
NR
MOSSER
CARBON STEEL
AISI 1110
NONE
N/A
ISOLATION
GUILLOTINE
NR
MOSSER
HIGH ALLOY
NICKEL BASE/CHROMIUM-IRON-MOLYBOENUM
NONE
N/A
ISOLATION
LOUVER
NR
MOSSER
CARBON STEEL/HIGH ALLOY
AISI 1110J NICKEL BASE/CHROMIUM-IRON-MOLYBDENUM
NONE
N/A
INLET
CARBON STEEL
AISI 1110
NONE
N/A
OUTLET
CARBON STEEL
AISI 1110
ORGANIC
NR
WET BALL MILL
COMPARTMENTED
                                            13-1095

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

SOUTHERN ILLINOIS POWER: MARION 4 (CONT.)

     DEVICE TYPE
     MANUFACTURER
     PRODUCT QUALITY - X SOLIDS

 ** TANKS
     SERVICE
    MIST  ELIMINATOR WASH
    ABSORBER RECYCLE
    POND  RETURN
    REAGENT PREP  PRODUCT
    CENTRATE SUMP
    WASTE SLURRY  SUMP

 ** PUMPS
    SERVICE
     ABSORBER  RECIRCULATION
     QUENCHER  RECIRCULATION
     MIST ELIMINATOR  WASH
     WASTE SLURRY
     RECLAIMED WATER
     MILL PRODUCT
     LIMESTONE SLURRY TRANSFER
     SLUDGE TRANSFER
     CENTRATE

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     DIMENSIONS - FT
     CAPACITY
     SHELL GENERIC MATERIAL  TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL  TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW  STREAM  DISPOSITION

 *» SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     CAPACITY
     SHELL GENERIC MATERIAL  TYPE
     SHELL SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM  DISPOSITION

*** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS
     INLET QUALITY -  X

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
                                               NR
                                               KOPPERS
                                                   30.0
NUMBER

   1
   2
   1
   2
****
****
NUMBER
   5
   Z
   Z
   Z
   Z
   Z
   Z
   3
****
THICKENER
 1
0
125.0 DIA X 9.0
826000 GAL
INORGANIC
HYDRAULICALLY-BONDED CONCRETE
ORGANIC
BITUMASTIC
ABSORBER BLEED
8X SOLIDS
30X SOLIDS
TO CENTRIFUGE
TO RECIRCUALTION TANK AND BALL MILL
CENTRIFUGE
 Z
0
125 GPM
CARBON STEEL
AISI 1110
THICKENER UNDERFLOW
30X SOLIDS
55X SOLIDS
PUG MILL FOR SLUDGE STABILIZATION
THICKENER
STABILIZATION
PUG MILL
NONE
   55.0
FINAL
LANDFILL
ON-SITE
CONVEYED
                                            13-1096

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTHERN ILLINOIS POWER:  MARION 4 (CONT.)

     SITE TREATMENT                              NONE

 ** PROCESS CONTROL  AND  INSTRUMENTATION
     CHEMICAL  PARAMETERS                        PH
     CONTROL LEVELS                              PH 5-6

 ** MATER BALANCE
     WATER LOOP TYPE                            CLOSED
     SOURCE OF MAKEUP WATER                     LAKE EGYPT

 *» CHEMICALS  AND CONSUMPTION
     FUNCTION                                    ABSORBENT
     NAME                                        LIMESTONE
     PRINCIPAL CONSTITUENT                      CAC03
     UTILIZATION - X                               69.0
     POINT OF  ADDITION                          BALL MILL

 »» FGD SPARE  CAPACITY INDICES
     ABSORBER  - X                                     .0
     MIST ELIMINATOR - X                             .0
     FAN - X                                          .0
     THICKENER - X                                    .0

 ** FGD SPARE  COMPONENT  INDICES
     ABSORBER                                         .0
     MIST ELIMINATOR                                 .0
     FAN                                              .0
     THICKENER                                       .0
	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 5/79  SYSTEM                                                                 744

 6/79  SYSTEM                                                                 720

       »» PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE UNIT BEGAN OPERATION IN MAY.  HOWEVER, THE
                         UNIT IS NOW DOWN AND HAS SUFFERED TWO PREVIOUS OUTAGES.  THE PREVIOUS OUT-
                         AGES WERE DUE TO CENTRIFUGE AND THICKENER PROBLEMS.  THE PRESENT OUTAGE
                         IS DUE TO BEARING FAILURES ON THE PUG MILL AND IMPROPER FIT OF THE SLUDGE
                         CONVEYING BELT.

 7/79  SYSTEM                                                                 744

 8/79  SYSTEM                                                                 744

 9/79  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE THIRD QUARTER A ROUTINE INSPECTION OF THE SCRUBBER INTERNALS
                         SHOWED NO SCALE FORMATION.

                         THE UTILITY REPORTED THAT THE FGD SYSTEM HAS ACHIEVED A 0.7 LB/MMBTU OF
                         S02 EMISSION LEVEL.  THE UNIT IS SUBJECT TO THE 1.2 LB/MMBTU S02 EMISSION
                         STANDARD.

                         THE CONTINUOUS MONITORS HAVE NOT BEEN OPERATING ACCEPTABLY.

                         A TURBINE OVERHAUL/INSPECTION IS SCHEDULED FOR OCTOBER 1, 1979.

10/79  SYSTEM                                             •"                  7**     °      0     .0

11/79  SYSTEM                  100.0                    26.7                  720   192    192

12/79  SYSTEM                  100.0                    71.0                  744   528    528
                                            13-1097

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER  198*

SOUTHERN ILLINOIS POWER: MARION 4 (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD  CAP.
                                                                 SOZ  PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN  FROM OCTOBER  1 THROUGH NOVEMBER  17 FOR A BOILER/TURBINE
                         INSPECTION.  NO MAJOR FGD  RELATED  PROBLEMS WERE ENCOUNTERED DURING THE
                         FOURTH QUARTER OF  1979 OTHER  THAN  SOME  FREEZE-UPS  CAUSED BY THE WINTER
                         WEATHER.

 1/80  SYSTEM                 100.0                    10.0                  74*    72     7Z

 2/80  SYSTEM                 100.0                    31.0                  696   216    216

 3/80  SYSTEM                 100.0                    48.4                  744   360    360

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY THE LOW BOILER AND  SCRUBBER HOURS WERE A RESULT OF AN
                         18 DAY BOILER OUTAGE NEEDED FOR CORRECTION OF TUBE PROBLEMS.   BOILER
                         OUTAGES DUE TO TUBE PROBLEMS  WERE  ALSO  EXPERIENCED IN FEBRUARY AND MARCH.

                         THE ONLY REPORTED  FGD-RELATED PROBLEM DURING THE FIRST QUARTER OF 1980 WAS
                         MAINTAINING THE BELT ALIGNMENT  IN  THE SLUDGE DISPOSAL SYSTEM.

 4/80  SYSTEM       66.7        66.7         66.7        66.7                  720   720    480 81.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         SHAFT BREAKAGE WITHIN THE  RECLAIM  WATER PUMP CAUSED FGD SYSTEM OUTAGE TIME
                         DURING APRIL.

 5/80  SYSTEM       77.4        58.8         58.8        32.3                  744   408    240 49.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A BOILER OUTAGE CAUSED THE FGD  SYSTEM NOT TO OPERATE FOR TWO WEEKS.

                         SHAFT BREAKAGE WITHIN THE  WATER RECLAIM PUMP CONTINUED THROUGH MAY.

 6/80  SYSTEM       50.0        50.0         50.0        50.0                  720   720    360 82.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         SHAFT BREAKAGE WITHIN THE  WATER RECLAIM PUMP CONTINUED TO CAUSE FGD
                         OUTAGE TIME.  A SOLUTION HAS  BEEN  PROPOSED TO SIPCO BY THEIR ENGINEERING
                         CONSULTANT  FOR CONSIDERATION.

 7/80  SYSTEM       96.7       100.0        100.0         95.9                  744   714    714 82.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         AFTER REVIEW  OF THE PROPOSED  SOLUTION OF THE SHAFT BREAKAGE PROBLEM WITHIN
                         THE RECLAIM WATER  PUMP,  SIPCO AUTHORIZED THEIR CONSULTANT TO PROCEED
                         WITH THE WORK TO CORRECT THE  PROBLEM.

 8/80  SYSTEM      100.0       100.0        100.0         90.5                  744   673    673 89.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         PROBLEMS WITH THE  SHAFT  BREAKAGE  IN THE RECLAIM WATER PUMPS CONTINUED
                         THROUGH AUGUST.   A REPLACEMENT  PUMP HAS BEEN PURCHASED TO SOLVE THE
                         PROBLEM.

 9/80  A           100.0       100.0        100.0        100.0
                                             13-1098

-------
                                                 UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTHERN ILLINOIS POWER: MARION 4 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                               S02  PART. HOURS HOURS  HOURS FACTOR

      B          100.0       100.0       100.0       100.0
      SYSTEM     100.0       100.0       100.0       100.0                  720   720    720 100.0

      «* PROBLEMS/SOLUTIONS/COMMENTS

                                            SUMMARY OF GENERAL PROBLEMS TO DATE

                        THE MAJOR CAUSES OF SCRUBBER OUTAGES HAVE CENTERED AROUND COLD WEATHER-RE-
                        LATED CONVEYOR BELT AND  PIPING PROBLEMS, PUG MILL BEARING FAILURES, AND
                        RECLAIM WATER PUMP SHAFT FAILURES.  OTHER PROBLEMS HAVE BEEN RELATED TO
                        PROCESS CHEMISTRY CONTROL.  THE UTILITY REPORTED THAT NUMEROUS SMALL PRO-
                        BLEMS ALSO HAVE OCCURRED BUT HAVE GENERALLY BEEN CORRECTED SOON AFTER THEIR
                        DISCOVERY.  DETAILS OF THE PRIMARY SCRUBBER PROBLEMS ARE OUTLINED BELOW:

                        COLD WEATHER PROBLEMS

                           THE MOST SEVERE FREEZING PROBLEM CONCERNS THE SLUDGE CONVEYOR SYSTEM.
                           WHEN THE AMBIENT TEMPERATURE DROPS BELOW 30 F THE CONVEYOR SYSTEM BE-
                           COMES INOPERABLE.  THE UTILITY HAS ATTEMPTED TO REMOVE THE FROZEN SLUDGE
                           USING VARIOUS COMMERCIAL AND COMPANY-BUILT SCRAPERS WITH LITTLE SUCCESS.
                           THE UTILITY ALSO INSTALLED HEATERS AT THE VARIOUS TRANSFER POINTS TO
                           THAW THE SLUDGE.  THIS PROVED UNSUCCESSFUL AS WELL.  THE PROBLEM HAS NOT
                           YET BEEN SOLVED.

                           AN ADDITIONAL PROBLEM WITH THE CONVEYOR SYSTEM HAS BEEN THE FAILURE OF
                           THE BELT TO TRACK CORRECTLY.  ON SEVERAL OCCASIONS THE BELT HAS TOUCHED
                           THE STRUCTURAL STEEL  SUPPORTS RESULTING IN BELT DAMAGE.  HOWEVER, BY RE-
                           DUCING THE CONVEYOR SPEED THE UTILITY HAS INCREASED THE ESTIMATED BELT
                           LIFE FROM FIVE TO 10  YEARS.

                           THE OTHER COLD WEATHER PROBLEM IS RELATED TO THE SCRUBBER VESSEL PIPING
                           SYSTEM.  ON SEVERAL OCCASIONS WATER LINE FREEZE UPS HAVE RESULTED IN
                           SCRUSBER OUTAGES.  WHEN THE PROBLEM WAS DISCOVERED, THE UTILITY IN-
                           STALLED EXTENSIVE HEAT TRACING ON EXPOSED WATER LINES.  ALTHOUGH THERE
                           HAS BEEN NO COLD WEATHER SINCE THE HEAT TRACING INSTALLATION, THE
                           UTILITY BELIEVES THAT THE PROBLEM IS SOLVED.

                        PUG MILL PROBLEM

                           SEVERAL BEARING FAILURES HAVE OCCURRED ON THE PUG MILL.  THE UTILITY
                           HAS INCREASED THE MAINTENANCE ON THE MILL SYSTEM TO LESSEN THE LIKELI-
                           HOOD OF ANOTHER FAILURE.  THE UTILITY REPORTED THAT IF THIS PROCEDURE
                           MODIFICATION DOES NOT INCREASE THE PUG MILL RELIABILITY TO AN ACCEPTABLE
                           LEVEL OTHER ACTION WILL BE TAKEN.

                        RECLAIM WATER PUMP SHAFT FAILURE

                           THE RECLAIM WATER PUMPS PRODUCE A VERY FLAT OUTPUT PRESSURE CURVE BUT
                           THEY FEED A SYSTEM COMPOSED OF MANY AUTOMATICALLY CONTROLLED DIAPHRAGM
                           VALVES.  THE OPENING  AND CLOSING OF THESE VALVES EXPOSES THE PUMPS TO
                           A WIDE VARIABILITY IN WATER REQUIREMENTS.  MOTOR SHAFT FATIGUE RESULTS
                           WHEN THE PUMPS ATTEMPT TO RESPOND TO THE VARIABLE DEMAND.  THE SYSTEM
                           SUPPLIER IS CURRENTLY SUPPLYING THE UTILITY WITH INFORMATION ON THE
                           OPERATION OF THE DIAPHRAGM VALVES.  THE UTILITY'S CONSULTANT ENGINEERING
                           FIRM WILL REVIEW THE  MATERIAL AND SUGGEST POSSIBLE CONTROL VALVE
                           CHANGES.  THE UTILITY REPORTED THAT IF THIS IS NOT POSSIBLE OR DOES  NOT
                           WORK, A DESIGN CHANGE TO A DIFFERENT PUMP TYPE WILL BE CONSIDERED.
                           WHILE THE PROBLEM CONTINUES, THE UTILITY IS KEEPING A COMPLETE SHAFT AND
                           IMPELLER ON SITE.

                        PROCESS CHEMISTRY

                           THE UTILITY HAS LOST  CONTROL OF THE PROCESS CHEMISTRY SEVERAL TIMES.
                           THE SLURRY SOLIDS LEVEL HAS CONSEQUENTLY INCREASED TO THE POINT THAT
                                            13-1099

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

SOUTHERN ILLINOIS POWER: MARION 4 (CONT.)
.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                             X REMOVAL   PER  BOILER  FGD   CAP.
                                             S02  PART. HOURS HOURS  HOURS FACTOR
                            THE THICKENER RAKE HAS BECOME  INOPERABLE.   TO SOLVE THE PROBLEM THE
                            UTILITY HAS BEEN  IMPROVING THE CHEMISTRY MONITORING SYSTEM.   IN THE
                            INTERIM, WHERE  EXISTING MONITORS ARE  OUT OF SERVICE, LAB PERSONNEL
                            PERFORM MANUAL  TESTS TO MAINTAIN PROCESS CHEMISTRY CONTROL.

                         THE BOILER AND THE FGD SYSTEM OPERATED THE  ENTIRE MONTH OF SEPTEMBER WITH
                         NO PROBLEMS.
10/80  SYSTEM     100.0       100.0

       **  PROBLEMS/SOLUTIONS/COMMENTS
                                          100.0
                                                       57.7
                                                                              744
                                                                       429  42.3
                         THE BOILER WAS TAKEN OFF  LINE ON  OCTOBER  18 FOR  A SCHEDULED  ANNUAL
                         OVERHAUL, DURING WHICH TIME THE FGD  SYSTEM  REMAINED  AVAILABLE.
 11/80
        A
        B
        SYSTEM
90.2
90.2
90.2
  .0
  .0
  .0
  .0
  .0
  .0
  .0
  .0
  .0
720
       71
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         DUE TO PROBLEMS  ENCOUNTERED HITH  THE  BOILER,  THE  SCHEDULED  MAINTENANCE
                         OUTAGE WAS CONTINUED THROUGH  NOVEMBER 26.

                         WHEN THE UTILITY ATTEMPTED TO START THE  FGD SYSTEM,  A LEAK  WAS DETECTED IN
                         THE HIGH PRESSURE  LUBRICATION LINE ON THE  BALL MILL  CAUSING THE SYSTEM TO
                         REMAIN OUT OF  SERVICE  THROUGH NOVEMBER.
 12/80   A
        B
        SYSTEM
79.7
79.4
79.6
78.1
77.8
77.9
78.1
77.8
77.9
72.2
71.9
72.0
                                                                              744   688
             536  88.3
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          THE  BALL MILL  LUBRICATION  PROBLEM CONTINUED INTO DECEMBER CAUSING APPROX-
                          IMATELY 150  HOURS  OF  OUTAGE  TIME.

                          ON DECEMBER  30 THE B  MODULE  WAS  TAKEN OFF LINE FOR APPROXIMATELY THREE
                          HOURS  TO REPAIR A  WALL LEAK  IN THE QUENCHER SECTION.   MODULE A WAS TAKEN
                          OFF  LINE LATER THAT DAY DUE  TO THE SAME  PROBLEM.
  1/81
        A
        B
        SYSTEM
40.0
77.4
59.0
33.9
65.3
50.0
33.9
74.9
53.0
33.6
64.6
49.0
744   737    366  97.0
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          MODULES A AND  B WERE  OUT OF  SERVICE APPROXIMATELY 159 HOURS DUE TO THE
                          CONVEYOR SYSTEM FREEZING.  MODULES A AND B WERE OFFLINE AN ADDITIONAL TWO
                          HOURS DUE TO A LEAK IN THE WASH WALL HEADER.

                          AN ADDITIONAL  278 HOURS OF OUTAGE TIME TO MODULE A WAS DUE TO A LEAK IN
                          THE CONTINUOUS MIST ELIMINATOR SUPPLY LINE.  THE REPAIR OF THIS FIBER-
                          GLAS LINE WAS  HAMPERED BY THE COLD WEATHER.
  2/81
        A
        B
        SYSTEM
64.3
70.1
67.3
64.3
70.1
67.3
64.3
70.1
67.3
64.3
70.1
67.3
672   672    452  95.1
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          DURING FEBRUARY THE FGD SYSTEM EXPERIENCED INTERMITTENT OPERATION DUE TO
                          A BELT FREEZING.  BOTH MODULES WERE OFF LINE APPROXIMATELY 141 HOURS.
                                             13-1100

-------
                                                  UTILITY FGO SURVEY:  OCTOBER  1983 - SEPTEMBER

SOUTHERN ILLINOIS POWER: MARION 4  (CONT. )
	PERFORMANCE  DATA	
PERIOD  MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   F6D    CAP.
                                                                S02  PART.  HOURS HOURS  HOURS  FACTOR

                         A HOLE  IN THE OUTLET DUCTWORK BETWEEN THE ISOLATION DAMPER  AND  THE STACK
                         CAUSED  MODULES A AND B TO BE  OFFLINE APPROXIMATELY 59 HOURS.

                         MODULE  B WAS TAKEN OFF LINE FOR APPROXIMATELY THREE HOURS TO  REPAIR A LEAK
                         IN  THE  WALLHASH HEADER.

                         MODULE  A WAS TAKEN OFF LINE TO REPAIR A PINHOLE  IN THE  ABSORBER DISCHARGE
                         SECTION.  THE REPAIR WAS COMPLETED,  BUT A MALFUNCTION OF THE  OUTLET GUILLO-
                         TINE DAMPER CAUSED THE MODULE 11 HOURS OF OUTAGE TIME.

                         DURING  FEBRUARY A BOOSTER FAN TRIPPED OFF LINE THREE TIMES  DUE  TO HIGH
                         VIBRATION CAUSING APPROXIMATELY 38 HOURS OF  OUTAGE TIME.

 3/81  A           30.6       46.3        50.3        30.6
       B           98.6        96.7        97.9        64.0
       SYSTEM       64.6        72.3        74.9        47.3                  744  492    352   93.0

       *» PROSLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS TAKEN OFF LINE ON MARCH 21, 1981  FOR AN  ANNUAL MAINTENANCE
                         INSPECTION, AND REMAINED OFF LINE THE REST OF THE  MONTH.

                         MODULE  A WAS OFF LINE APPROXIMATELY  ONE HOUR DUE TO HIGH VIBRATIONS OF THE
                         BOOSTER FAN.  ON MARCH 10 A SHORT IN THE BOOSTER FAN MOTOR  CAUSED
                         MODULE  A TO BE OUT OF SERVICE FOR THE REST OF THE  MONTH.

                         MODULE  B WAS OUT OF SERVICE A TOTAL  OF 10 HOURS  FOR REPAIRS TO  THE LEAKS
                         IN  THE  WALL WASH HEADERS.

 4/81  A           76.3        59.6        83.9        51.9
       B           85.0        82.8        82.8        72.1
       SYSTEM       81.0        71.0        83.0        62.0                  720  627    447   77.0

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         DURING  APRIL MODULE A WAS UNAVAILABLE APPROXIMATELY 206 HOURS DUE TO  THE
                         INSTALLATION OF THE REBUILT FAN MOTOR.

                         ADDITIONAL OUTAGE TIME WAS DUE TO THE REPACKING  OF THE  QUENCHER PUMP.

                         APPROXIMATELY FOUR HOURS OF OUTAGE TIME WAS NECESSARY TO REPAIR A WALL
                         WASH HEADER LEAK.

                         MODULE  B WAS OUT OF SERVICE APPROXIMATELY 91 HOURS DUE  TO THE INSTALLATION
                         OF  A HYDROCLONE HEAD IN THE QUENCHER.

 5/81  A           99.5        99.5        99.6        99.5
       B           68.4        68.4        91.2        68.4
       SYSTEM       84.0        84.0        96.0        84.0                  744   744    625   82.7

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MAY MODULES A AND B EXPERIENCED WALL WASH HEADER LEAKS CAUSING SOME
                         OUTAGE  TIME.

                         MODULE  B WAS OUT OF SERVICE APPROXIMATELY 227 HOURS DUE TO THE  REPLACEMENT
                         OF  THE  IMPELLER AND RUBBER LINERS ON THE ENGINE  AND SUCTION SIDES OF  THE
                         PUMP.

 6/81  A           89.5        89.5        89.5        89.5
       B           47.2        47.2        54.0        47.2
       SYSTEM       68.4        68.4        71.8        68.4                  720   720    493  94.7
                                            13-1101

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER  1984

SOUTHERN ILLINOIS POWER: MARION 4 (CONT.)
	.	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION
                                                         X REMOVAL   PER  BOILER  FGD   CAP.
                                                         S02  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         ON JUNE 3 BOTH MODULES WERE  OFF-LINE  TO ALLOW REPAIR OF WALL WASH  HEADER
                         LEAKS.  UPON ATTEMPED STARTUP  ON  JUNE 3, IT WAS DISCOVERED THAT SEVERAL OF
                         THE ABSORBER PUMP DISCHARGE  VALVES  WOULD NOT FUNCTION CORRECTLY.  THIS
                         CAUSED THE SYSTEM TO REMAIN  DOWN  THROUGH JUNE 5.

                         THE BEARING ON MODULE B  QUENCHER  PUMP FAILED RESULTING IN AN OUTAGE.

                         MODULE A WAS TAKEN  OFF-LINE  ON JUNE 24 FOR  FOUR HOURS TO REPAIR THE WALL
                         WASH HEADER.
  7/81
        A
        B
        SYSTEM
            75.1
            73.4
            74.3
             75.1
             73.4
             74.3
 91.5
 95.8
 93.6
75.1
73.4
74.3
744   744
             553  66.1
        ** PR03LEMS/SOLUTIONS/COMMENTS
                          THE  A AND  B MODULES WERE  OFF  THREE AND  FOUR TIMES, RESPECTIVELY,  DURING THE
                          MONTH FOR  REPAIR  OF WALL  WASH HEADER  LEAKS.
  8/81
        A
        B
        SYSTEM
            46.1
            58.7
            52.4
             42.5
             50.9
             46.8
 54.3
 65.2
 59.9
42.5
50.9
46.8
744   744
348  75.0
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE  FGD  SYSTEM DID  NOT OPERATE  DURING THE FIRST PART OF THE MONTH AS A
                          RESULT OF  A THICKENER  OVERLOAD.

                          OTHER  MISCELLANEOUS OUTAGES DURING THE MONTH OCCURRED TO CHANGE A WALL WASH
                          HEADER GASKET ON MODULE B AND TO CORRECT HIGH BOOSTER FAN VIBRATION ON
                          MODULE A.
  9/81
        A
        B
        SYSTEM
           100.0
           100.0
           100.0
             79.4
             58.2
             68.8
100.0
100.0
100.0
46.8
34.3
40.6
                                                                              720   424
                                                                                           292
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          DURING SEPTEMBER THE FGD SYSTEM WAS OPERATIONAL FOR 100X OF THE
                          TIME IT WAS NEEDED.   THERE WERE, HOWEVER, 302.5 HOURS WHEN ONLY ONE MODULE
                          WAS NECESSARY TO HANDLE THE BOILER LOAD.
 10/81
A
B
SYSTEM
 11/81  A
        B
        SYSTEM

 12/81  A
        B
        SYSTEM
100.0
100.0
100.0

100.0
100.0
100.0

 97.6
 76.5
 87.0
                                92,
                                86,
                                89,
                        93.1
                        78.6
                        85.9

                        94.3
                        89.9
                        92.1
100.0
100.0
100.0

100.0
100.0
100.0
63.4
59.0
61.2
 99,
 96,
92.
78.
85,

80.
76,
                                            97.7
                                                        78.3
                                                                              744   510    456
                                   720   715    614
                                                                              744   633    583
        ** PROBLEMS/SOLUTIONS/COKMENTS
                          THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                          DURING THE FOURTH QUARTER 1981.
  1/82  A
                    89.9
                                89.9
                                    92.1
                                                        89.9
                                             13-1102

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 198*

SOUTHERN ILLINOIS POWER: MARION  4 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY  OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  F6D   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


2/82


B
SYSTEM
A
B
SYSTEM
78.2
84.0
86.9
92.4
89.6
68.9
79.4
80.4
89.8
85.1
89.3
90.7
84.3
100.0
92.1
68.9
79.4
69.6
77.8
73.7

744


672

744


582

591


496
       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE EXPERIENCED
                         DURING JANUARY AND FEBRUARY.

 3/82  SYSTEM                                                                744

 4/82  SYSTEM                                                                720

 5/82  SYSTEM                                                                744

 6/82  SYSTEM                                                                720

 7/82  SYSTEM                                                                744

 8/82  SYSTEM                                                                744

 9/82  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE PERIOD OF MARCH 1982 THROUGH SEPTEMBER
                         1982.

 10/82  A            5.4        85.0       100.0         4.6
       B            5.4          .0                      .0
       SYSTEM       5.4        42.5       100.0         2.3                  744  •  40     17   1.5

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OUT OF SERVICE DURING MOST OF OCTOBER DUE TO A SCHEDULED
                         OUTAGE.

 11/82  A          100.0        84.4       100.0        84.4
       B           99.6        91.7       100.0        91.7
       SYSTEM      99.8        88.1       100.0        88.1                  720   720    634  70.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DUE TO LOW LOADS, ONLY ONE MODULE WAS REQUIRED DURING NOVEMBER.

 12/82  A          100.0        88.7       100.0        88.7
       B          100.0        98.4       100.0        98.4
       SYSTEM     100.0        93.5       100.0        93.5                  744   744    696  66.3

       ** PPOBLEMS/SOLUTIONS/COMMENTS

                         DUE TO LOW LOADS, ONLY ONE MODULE WAS REQUIRED DURING DECEMBER.

 1/83  SYSTEM                                                                744

 2/83  SYSTEM                                                                672

 3/83  SYSTEM                                                                744
                                            13-1103

-------
UTILITY FGD SURVEY: OCTOBER  1983  -  SEPTEMBER 1984

SOUTHERN ILLINOIS POWER: MARION 4 (CONT.)
.	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY  OPERABILITY RELIABILITY UTILIZATION
7. REMOVAL   PER  BOILER  FGD   CAP
S02  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
  7/83
  8/83
  9/83
                          INFORMATION WAS UNAVAILABLE FOR THE PERIOD OF JANUARY 1983 THROUGH MARCH
                          1983.
4/83


5/83


6/83


A
B
SYSTEM
A
B
SYSTEM
A
B
SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
86.9
81.8
84.4
86.9
81.8
84.4
86.9
81.8
84.4
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
41.3
38.9
40.1
41.2
38.8
40.0
41.3
38.9
40.1
                                                                              720   343
                                                                              744   353
                                                                              720   343
                                                                                           289
                                                                                           298
                                                                                           289
       **  PROBLEMS/SOLUTIONS/COMMENTS
                          THE  UTILITY REPORTED THAT THE UNIT WAS DOWN 1146 HOURS DURING THE SECOND
                          QUARTER  OF 1983.
                                                                              744   744    729  93.6
                                                                              744   740    710  91.3
                                                                              720   270    264  31.8
A
B
SYSTEM
A
B
SYSTEM
A
B
SYSTEM
98.4
99.1
98.7
98.9
97.6
98.3
39.6
40.0
39.8
98.4
97.4
97.9
96.5
95.4
95.9
100.0
95.2
97.6
98.4
99.2
98.8
98.9
98.7
98.8
98.2
100.0
100.0
98.4
97.4
97.9
96.0
94.9
95.4
37.5
35.7
36.6
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE  UTILITY REPORTED THAT THE UNIT WAS DOWN 450 HOURS DURING SEPTEMBER FOR
                          A SCHEDULED FALL OUTAGE.
10/83
11/83
12/83
1/84
2/84
3/84
A
B
SYSTEM
A
B
SYSTEM
A
B
SYSTEM
A
B
SYSTEM
A
B
SYSTEM
A
B
SYSTEM
97.0
97.7
97.4
96.9
97.6
97.3
97.0
97.7
97.4
99.2
93.7
96.4
99.7
94.3
97.0
99.2
93.7
96.4
94.1
92.2
93.1
94.0
92.1
93.1
94.1
92.2
93.1
97.9
90.5
94.2
97.8
90.4
94.1
97.9
90.5
94.2
98.2
100.0
99.2
98.1
100.0
99.1
98.2
100.0
99.2
100.0
98.4
100.0
100.0
98.3
100.0
100.0
98.4
100.0
94.1
92.2
93.1
94.0
92.1
93.1
94.1
92.2
93.1
95.6
88.3
91.9
96.1
88.8
92.5
95.6
88.3
91.9
                                                                              744   744
                                                                              720   720
                                                                              744   744
                                                                              744   726
                                                                              696   684
                                                                              744   726
                                                                                           693
                                                                                           670
                                                                                           693
                                                                                           684
                          644
                          684
                                             13-1104

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SOUTHERN ILLINOIS POWER: MARION  4 (CONT.)
PERIOD
4/84


5/84


6/84


MODULE AVAILABILITY OPER ABILITY
A
B
SYSTEM
A
B
SYSTEM
A
B
SYSTEM
38.
37.
38.
38.
37.
38.
38.
37.
38.
9
8
3
7
8
2
9
8
3
85
85
85
85
85
65
85
85
85
.3
.7
.5
.1
.5
.3
.3
.7
.5
RELIABILITY
100.
100.
100.
100.
100.
100.
100.
100.
100.
0
0
0
0
0
0
0
0
0
LC UAIA 	
UTILIZATION X REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR
32
32
32
32
32
32
32
32
32
.4
.5
.4
.3
.4
.3
.4
.5
.4


720 273 234


744 282 241


720 273 234
       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO FGD RELATED OUTAGES WERE REPORTED FOR THE PERIOD OF OCTOBER 1983
                         THROUGH JUNE 1984.

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION MAS UNAVAILABLE FOR THE THIRD QUARTER OF 1984.
                                             13-1105

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 «» FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - X
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
     NUMBER
     TYPE

 ** FABRIC FILTER
     NUMBER
     TYPE

 ** ESP
     NUMBER
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY   CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE
   .100 LB/MMBTU)
   .200 LB/MMBTU)
   .700 LB/MMBTU)
                                                SOUTHERN INDIANA GAS  &  ELEC
                                                A.B. BROWN
                                                1
                                                WEST FRANKLIN
                                                INDIANA
                                                D
                                                   43.          (
                                                  516.          (
                                                  301.          <
                                                  250
                                                  265
                                                  250
                                                  252
                                                  265
                                                BABCOCK t WILCOX
                                                PULVERIZED COAL
                                                BASE
                                                  429.43       ( 910000 ACFM)
                                                  154.4        ( 310 F)
                                                  152.         ( 498 FT)
                                                CONCRETE
                                                    4.4        ( 14.5 FT)
(  11100 BTU/LB)
 10100-11600
                                                COAL
                                                BITUMINOUS
                                                25819.

                                                    9.40
                                                8.4-11.4
                                                   13.30
                                                10.1-21.1
                                                    3.35
                                                2.8-4.5
                                                      .05
                                                0.01-0.08
                                                 0
                                                NONE
                                                 0
                                                NONE
                                                COLD SIDE
                                                BUELL DIVISION, ENVIROTECH
                                                  372.8         ( 790036 ACFM)
                                                  145.0         (  293 F)
                                                     .8         (  3. IN-H20)
                                                    99.5
                                                  0
                                                NONE
                                                N/A
                                                N/A
                                                N/A
                                                N/A
                                                N/A
                                                N/A
                                                N/A
                                             13-1106

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
SOUTHERN INDIANA GAS * ELEC: A.B.  BROWN 1 (CONT.)
*** FGD SYSTEM

 *» GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT  DESIGN PARTICLE  REMOVAL EFFICIENCY
     UNIT  DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION -  X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 *« DESIGN AND OPERATING PARAMETERS

 «* QUENCHER/PRESATURATOR
     CONSTRUCTION  MATERIAL GENERIC TYPE
     CONSTRUCTION  MATERIAL SPECIFIC TYPE

 »* ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON  TYPE
     SUPPLIER
     DIMENSIONS  -  FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO -  L/CU.M
     GAS-SIDE PRESSURE  DROP - KPA
     INLET GAS FLOW - CU.  M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL  EFFICIENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER  SYSTEM
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON  TYPE
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES  PER STAGE
     DISTANCE BETWEEN  STAGES - CM
     PRESSURE DROP - KPA
     CONSTRUCTION  MATERIAL GENERIC TYPE
     CONSTRUCTION  MATERIAL SPECIFIC TYPE
     WASH  WATER  SOURCE
     WASH  FREQUENCY

 »* REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON  TYPE
     PERCENT GAS  BYPASSED - AVG
     TEMPERATURE  INCREASE - C
 THROWAWAY PRODUCT
 WET SCRUBBING
 DUAL ALKALI
 NONE
 FMC
 MID-VALLEY
 FULL SCALE
 NEW
X   99.50
    85.00
      .8
  1
  4/79
  3/79
 12/76
 NR
 NR
 2
 0
IMPINGEMENT TOWER
FIXED BAFFLE
DISC CONTACTOR
FMC
30.5 DIA X 61.0
CARBON STEEL
AISI 1110
N/A
ORGANIC
GLASS FLAKE-FILLED POLYESTER
NR
FULL DIAMETER CONE-SPLASH RING CASCADES
 3
               ( 5000 6PM)
               ( 10.0 GAL/1000 ACF)
               ( 4.0 IN-H20)
               ( 504000 ACFM)
               (  293 F)
   315.
     1.3
     1.0
   237.84
   145.0
    85.0
 PRIMARY COLLECTOR
  2
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 HORIZONTAL
     1
     1
     1.78
      .5
 ORGANIC
 POLYPHENYLENE
 FRESH
 INTERMITTENT
 BYPASS
 COLD SIDE
 N/A
    15.0
    11.1
               (   .7 IN)
               ( 2.0 IN-H20)
               (   20 F)
                                            13-1107

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1964

SOUTHERN INDIANA GAS & ELEC: A.B. BROWN 1 (CONT.)
 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     DIMENSIONS
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 «* DUCTWORK
     LOCATION
     DIMENSIONS
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION  EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMSER
     FULL  LOAD DRY FEED  CAPACITY - M.TONS/HR
     PRODUCT QUALITY - X SOLIDS

 *« TANKS
     SERVICE
      ABSORBER RECYCLE
      WASTE SLURRY  BLEED

  «* PUMPS
      SERVICE
      ABSORBER  RECIRCULATION
      THICKENER UNDERFLOW
      REGENERATION RETURN

  ** SOLIDS CONCENTRATING/DEWATERING
      DEVICE
      NUMBER
      NUMBER OF SPARES
      CAPACITY
      SHELL GENERIC MATERIAL  TYPE
      OUTLET STREAM CHARACTERISTICS

  ** SOLIDS CONCENTRATING/DEWATERING
      DEVICE
      NUMBER
               ( 504000 ACFM)
               (  £93 F)
 Z
 0
CENTRIFUGAL
WESTINGHOUSE
BOOSTER
FORCED DRAFT
DRY
  237.84
  145.0
CARBON STEEL
NR
NR
NR
NR
NR
NR
NR
SCRUBBER INLET
9.5 X 12.3
CARBON STEEL
AISI 1110
NONE
N/A
SCRUBBER OUTLET
12.0 X 8.0
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER
SLAKER
NR
        4 TIERNAN
WALLACE
 3
    3.6
   20.0
NUMBER

   2
   2
NUMBER

   4
   6
   2
VACUUM FILTER
 3
1
340 TON/DAY
CARBON STEEL
60X SOLIDS
THICKENER
 1
               (   4 TPH)
                                             13-1108

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
SOUTHERN INDIANA GAS  t  ELEC:  A.B.  BROWN 1 (CONT.)
     NUMBER OF SPARES
     DIMENSIONS  -  FT
     CAPACITY
     SHELL GENERIC MATERIAL TYPE

«** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT
     SITE DIMENSIONS
     SITE CAPACITY - CU.M
     SITE SERVICE LIFE - YRS

 ** PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL  PARAMETERS
     CONTROL LEVELS
     MONITOR LOCATION
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE

 ** MATER BALANCE
     WATER  LOOP  TYPE

 «* CHEMICALS  AND CONSUMPTION
     NAME
     CONSUMPTION

 ** FGD SPARE  CAPACITY INDICES
     ABSORBER  -  X

 ** FGD SPARE  COMPONENT INDICES
     ABSORBER
                 100.0 DIA X 16.0
                 800,000 GAL
                 CARBON STEEL
                 DEMATERED
                 N/A
                 N/A
                 FINAL
                 LANDFILL
                 ON-SITE
                 TRUCK
                 NONE
                 1*00 FT X 1*00 FT X 35 FT DEEP
                    183*500     (  1500.0 ACRE-FT)
                  20
                 SCRUBBER MODULE PH, LIME REACTOR PH
                 SCRUBBER MODULE 6.3-6.8, LIME REACTOR 8.0-10.0
                 ABSORBER RECIR. LINE-LIME REACTOR OVERFLOW
                 AUTOMATIC
                 FEEDBACK
                 OPEN/CLOSED
                 LIME
                 6.3 TPH
                    20.0


                       .3
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
 3/79  SYSTEM

 */79  SYSTEM

       ** PROSLEMS/SOLUTIONS/COMMENTS
                                              7**

                                              720
                                                                29.6
                         THE FGD SYSTEM BEGAN OPERATIONS ON MARCH 18, 1979.  NO OPERATIONAL DATA
                         ARE YET AVAILABLE.
 5/79  SYSTEM

 6/79  SYSTEM

       **  PROBLEMS/SOLUTIONS/COMMENTS
                                               7**

                                               720
                                        5*.7

                                        65.*
                         OPERATING HOURS ARE NOT YET AVAILABLE.  HOWEVER, THE UNIT HAS BEEN RUNNING
                         INTERMITTENTLY AS A RESULT OF PUMP LINER AND FRP PIPING DESIGN PROBLEMS.
 7/79  SYSTEM

 8/79  SYSTEM
62.8

9*. 3
5*.8

9*.2
7**   650    *08  *8.1

7**   7*3    701  51.7
                                            13-1109

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER  1984

SOUTHERN INDIANA SAS & ELEC: A.B. BROWN 1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION
                                             X REMOVAL   PER  BOILER  FGD   CAP.
                                             S02  PART. HOURS HOURS  HOURS FACTOR
       *« PROBLEMS/SOLUTIONS/COMMENTS
                         IN AUGUST THE  FGD  SYSTEM WAS FORCED OFF LINE FOR 43 HOURS DUE TO PROBLEMS
                         WITH THE RECYCLE PUMP  IMPELLERS.
  9/79  SYSTEM
                                74.6
                                                        74.2
                                                          720   716
                                                                       534  62.5
       »* PROBLEMS/SOLUTIONS/COMMENTS
                          IN  SEPTEMBER  52  HOURS  OF  SCHEDULED  OUTAGE WERE USED TO INSTALL A WATER
                          FILTER.   THE  SCRUBBER  WAS ALSO TAKEN OFF  LINE FOR 72 HOURS FOR PRECIPITATOR
                          TESTING.   THE ONLY  FORCED OUTAGE  DURING THE MONTH BEGAN ON SEPTEMBER  28 AND
                          LASTED THROUGH THE  END OF THE  MONTH AS A  RESULT OF POOR FILTER CAKE
                          QUALITY.   THIS HAS  RESULTED  FROM  PROBLEMS WITH THE VACUUM FILTERS AS  WELL
                          AS  CHEMICAL PROBLEMS.
 10/79   A
        B
        SYSTEM

 11/79   A
        B
        SYSTEM
 12/79
        A
        B
        SYSTEM
88.6
87.3
88.0

91.0
91.0
91.0

80.9
81.2
81.1
96.8
98.5
97.7

97.1
94.4
95.8

80.9
81.3
81.1
100.0
 98.5
 99.3

 98.2
 95.5
 96.9

 80.9
 81.2
 81.1
84.5
86.0
85.3

89.4
86.9
88.2

80.8
81.2
81.0
744   649
720   663
                                                                              744   743
             634  49.6
                                                                                           635  62.1
             603  53.5
        *«  PROBLEMS/SOLUTIONS/COMMENTS
                          DURING THE  FOURTH  QUARTER PROBLEMS WERE ENCOUNTERED WITH THE LIME SLAKER
                          FEED.

                          THE  THICKENER  RAKE FROZE CAUSING 9 DAYS OUTAGE TIME.

                          THE  ISOLATION  DAMPER HAS CAUSED SOME PROBLEMS THIS QUARTER.   THE UTILITY
                          HAS  NOT YET SOLVED THIS PROBLEM.
  1/80
        A
        B
        SYSTEM
99.0
99.0
99.0
96.5
99.0
98.0
 99.1
 99.1
 99.1
96.4
99.0
97.7
                                                                              744   744
             727  65.8
        *» PROBLEMS/SOLUTIONS/COMMENTS
                          SEVEN HOURS OF FGD SYSTEM FORCED OUTAGE TIME DURING JANUARY WERE CAUSED
                          BY A THICKENER RAKE STALL.
  2/80
        A
        B
        SYSTEM
99.1
98.4
98.8
70.3
70.0
70.2
 98.8
 97.8
 98.3
69.4
68.7
69.1
                                                                              696   687
             481  75.5
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          SOME  OUTAGE TIME IN FEBRUARY RESULTED FROM A WET SLUDGE PRODUCT.
                          CHEMICAL IMBALANCE CAUSED THE SLUDGE PROBLEM.
  3/80   A
        B
        SYSTEM
98.7
99.2
99.0
64.8
51.6
58.2
 95.2
 96.3
 95.8
26.5
21.1
23.8
                                                                              744   304
             177  23.8
                                             13-1110

-------
                                                  UTILITY F6D  SURVEY:  OCTOBER  1983 -  SEPTEMBER
SOUTHERN INDIANA GAS ft ELEC: A.B.  BROWN 1  (CONT.)
	PERFORMANCE DATA	
PERIOD  MODULE AVAILABILITY  OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR
       **  PROBLEMS/SOLUTIONS/COMMENTS
                         DURING MARCH,  BOILER DOWN TIME WAS DUE TO A SCHEDULED  UNIT OUTAGE,  DURING
                         WHICH  TIME MAINTENANCE WAS PERFORMED ON THE SCRUBBER.
 4/80
A
B
SYSTEM
100.0
100.0
100.0
 96.8
 99.7
 98.3
                                          100.0
                                          100.0
                                          100.0
92.9
95.7
94.3
                                                                             720   691
                                                                                   679  58.6
       «* PROBLEMS/SOLUTIONS/COMMENTS
                         DURING APRIL,  THERE WERE NO OPERATIONAL PROBLEMS WITH THE FGD SYSTEM.
                         SYSTEM WAS AVAILABLE 100X OF THE TIME.
                                                                                         THE
 5/80
A
B
SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
                                          100.0
                                          100.0
                                          100.0
82.8
82.8
82.8
                                                                             744   604
                                                                                          616   53.7
       »* PROBLEMS/SOLUTIONS/COMMENTS
                         DURING MAY NO FORCED OUTAGES WERE EXPERIENCED WITH THE FGD SYSTEM.   THE
                         BOILER WAS OFF LINE FOR 140 HOURS DURING THE MONTH FOR GENERAL MAINTENANCE,
                         DURING WHICH TIME SOME GENERAL FGD SYSTEM MAINTENANCE WAS ALSO PERFORMED.
 6/80
A
B
SYSTEM
                  100.0
                  100.0
                  100.0
            100.0
            100.0
            100.0
            100.0
            100.0
            100.0
98.2
98.2
98.2
                                                                      720   706
             707  55.4
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         NO FGD RELATED PROBLEMS WERE REPORTED FOR THE MONTH OF JUNE.
                         SYSTEM OPERATED 100X OF THE TIME THE BOILER WAS ON LINE.
                                                                                       THE FGD
 7/80
       A
       B
       SYSTEM
            98.1
            86.8
            92.4
             97.9
             87.7
             92.8
             97.9
             87.7
             92.8
92.5
82.9
87.7
744   703
             653  62.6
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE B MODULE RECIRCULATION PUMPS WERE THE MAJOR CAUSE OF DOWNTIME.   TWO
                         PIECES OF THE CHEVRON MIST ELIMINATOR FELL CAUSING THE SUCTION LINES TO
                         PLUG.
                         ADDITIONAL PROBLEMS WITH THE PUMP WERE CAUSED BY THE THRUST BEARING.
                         WAS CORRECTED BY THE MANUFACTURER.
                                                                                               THIS
                         THE UNAVAILABILITY OF THE VACUUM FILTERS AND ASSOCIATED EQUIPMENT REQUIRED
                         THE SCRUBBER TO SHUTDOWN TO AVOID A STOPPAGE OF THE THICKENER RAKE.  THIS
                         SITUATION ACCOUNTED FOR APPROXIMATELY 15 HOURS OF SYSTEM OUTAGE TIME
                         DURING JULY.
 8/80
       A
       B
       SYSTEM
            94.5
            94.8
            94.6
             94.5
             94.8
             94.6
             94.5
             94.8
             94.6
94.5
94.8
94.6
744   744
             704  61.4
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE MAJOR CAUSE OF UNAVAILABLITY FOR AUGUST WAS PROBLEMS WITH SOLIDS
                         DISPOSAL, INCLUDING PROBLEMS WITH PRIMARY LIQUID-SOLID SEPARATION UP TO
                         AND INCLUDING FINAL LANDFILLING.
 9/80  A
                  100.0
                               99.6
                                    99.6
                                                       99.6
                                            13-1111

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

SOUTHERN INDIANA GAS & ELEC: A.B. BROWN  1  (CONT.)
	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION
                                                         X REMOVAL    PER  BOILER  FGD   CAP.
                                                         S02  PART. HOURS HOURS  HOURS FACTOR
B
SYSTEM
100.0
100.0
99.6
99.6
99.6
99.6
99.6
99.6
720
720
717 59.8
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          SLUDGE  DISPOSAL  REMAINS THE MOST PREVALENT PROBLEM DUE TO MECHANICAL
                          BREAKDOWN  OF  THE DISPOSAL TRUCKS AND UNDERFLOW PUMPS, IN ADDITION TO THE
                          HIGH  MAINTENANCE REQUIREMENTS OF THE ROTARY VACUUM FILTERS.

                          THE MONTH  OF  SEPTEMBER ALSO SAW AN EXTREMELY HIGH RATE OF FAILURE OF
                          RECIRCULATION PUMPS,  WITH DAMAGE TO THE RUBBER LINED CASINGS AND IMPELLERS.
                          THE CAUSE  OF  THIS PROBLEM IS UNKNOWN TO THE UTILITY AT THIS POINT.
 10/80
A
B
SYSTEM
 98.4
100.0
 99.2
98.2
93.8
96.0
98.2
93.8
96.0
98.2
93.8
96.0
                                                                                           714  59.8
        *# PROBLEMS/SOLUTIONS/COMMENTS
                          THE  SYSTEM UNAVAILABILITY DURING THE MONTH WAS CAUSED BY TWO SEPARATE
                          INSTANCES OF  REGULATOR VALVE FAILURE.

                          NO MAJOR  FGD  RELATED PROBLEMS WERE REPORTED FOR OCTOBER! HOWEVER,  SEVERAL
                          PROCESS LINES HAD LOW FLOWS AT TIMES DUE TO BLOCKAGES CAUSED BY PIECES OF
                          BROKEN MIST ELIMINATOR.
 11/80
A
B
SYSTEM
 97.5
 97.5
 97.5
83.8
83.8
83.8
85.2
85.2
85.2
54.6
54.6
54.6
                                                                              720   469
393  38.2
        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE BOILER WAS DOWN FROM NOVEMBER 7 TO NOVEMBER 17.

                          THE FGD SYSTEM WAS SHUTDOWN ON NOVEMBER 6 DUE TO DEPLETION OF THE SODA
                          ASH INVENTORY WHICH RESULTED IN A LOW CHEMICAL CONCENTRATION.

                          THE TRANSITION DUCTWORK FROM ONE MODULE TO THE STACK WAS REPLACED WITH
                          317L SS WHILE THE OTHER SIDE RECEIVED A FLOUROELASTOMER
                          COATING.

                          THE CHEVRONS WERE CAKED WITH AN EXTREMELY HARD AND HEAVY MATERIAL CONSIST-
                          ING PRIMARILY OF SODIUM CARBONATES AND SULFATES.

                          THE MIST ELIMINATORS WERE RE-TIED DURING NOVEMBER TO PREVENT FURTHER
                          SECTIONS FROM FALLING.
 12/80
A
B
SYSTEM
100.0
 98.2
 99.2
                                97.4
                                95.0
                                96.2
            97.4
            95.0
            96.2
            94.3
            92.1
            93.2
                                                                              744   721
                                   694  52.4
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          A MAJOR EQUIPMENT PROBLEM WITH THE LIME SLAKERS WAS ENCOUNTERED DURING
                          DECEMBER.   THE PH AND LEVEL CONTROLS CAUSED ERRATIC OPERATION SEVERAL
                          TIMES DURING THE MONTH, ADDING TO THE CONTINUAL WATER BALANCE PROBLEMS.
  1/81   A
        B
        SYSTEM
            99.3
            99.3
            99.3
             98.9
             98.8
             98.9
            98.9
            98.8
            98.9
            98.9
            98.8
            98.9
                      744   744    736  61.8
                                             13-1112

-------
                                                  UTILITY  FGD  SURVEY:  OCTOBER  1983  -  SEPTEMBER

SOUTHERN INDIANA GAS ft ELEC: A.B. BROWN  1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD   CAP.
                                                                S02   PART.  HOURS  HOURS  HOURS  FACTOR


      **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY OUTAGE TIME OCCURRED DUE TO  ELECTRICAL MALFUNCTIONS OF THE
                         SLAKE  FEEDER.

                         ADDITIONAL PROBLEMS WERE ENCOUNTERED WITH DRIFTING OF THE  PH MEASUREMENT
                         SYSTEM.

 2/81 A           99.0         99.0        99.0        99.0
      B           99.6         99.6        99.6        99.6
      SYSTEM       99.3         99.3        99.3        99.3                  672    672     667  56.8

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY MODULES A AND B WERE DOWN FOR THREE HOURS  DUE TO LIME
                         TRANSFER SYSTEM PROBLEMS.

                         MODULE A REQUIRED  AN ADDITIONAL FOUR HOURS  OF DOWNTIME DUE TO PROBLEMS WITH
                         THE RECIRCULATION  PUMPS AND ASSOCIATED DISCHARGE  VALVES.

                         MAINTENANCE WAS NECESSARY ON THE VACUUM FILTERS AND THE  SLUDGE DISPOSAL
                         TRUCKS DURING THE  MONTH.

 3/81 A           89.4         79.5        83.4        78.1
      B           97.9         92.7        92.7        91.1
      SYSTEM       93.6         86.1        88.2        84.6                  744    731     630  59.8

      »*  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH A LOW CHEMICAL CONCENTRATION IN THE  FGD SYSTEM CAUSED BY
                         PREPARATION FOR A  FIVE WEEK TURBINE OVERHAUL RESULTED IN SOME OUTAGE  TIME.

                         ADDITIONAL DOWN TIME WAS DUE TO PROBLEMS ENCOUNTERED WITH  THE ID FAN.

                         MODULE A EXPERIENCED SOME OUTAGE TIME DUE TO FAILURE OF  THE RECIRCULATION
                         PUMP LINING.

 4/81 A          100.0           .0                      .0
      B          100.0           .0                      .0
      SYSTEM      100.0           .0                      .0                  720     87      0   5.5

      »*  PROBLEMS/SOLUTIONS/COMMENTS

                         IN PREPARATION FOR A SCHEDULED FIVE-WEEK TURBINE/GENERATOR OUTAGE, THE
                         SODA ASH PLANT WAS SHUTDOWN AT THE END OF MARCH.   THE BOILER REMAINED ON
                         LINE FOR 87 HOURS  AT THE BEGINNING OF APRIL; HOWEVER, THE  FGD SYSTEM  WAS
                         NOT OPERATED DUE TO THE LACK OF SODA ASH, PRECLUDING THE POSSIBILITY  OF
                         MEETING EMISSION LIMITATIONS.

                         DURING THE OVERHAUL THE LINING WAS REPLACED IN THE BYPASS  DUCT,  A SLAKER
                         GRIT REMOVAL SLUICING SYSTEM WAS INSTALLED  AND A  DRAIN  RECOVERY  SYSTEM WAS
                         ADDED.

                         THE MIST ELIMINATORS WERE REPLACED CAUSING  INTERNAL AND EXTERNAL PIPING
                         CHANGES FOR THE MIST ELIMINATOR WASH HEADERS.

 5/81 A           86.7         79.5        80.9        49.6
      B           88.7         82.5        84.0        51.5
      SYSTEM       87.7         81.0        82.4        50.5                  744   464     376   35.9
                                            13-1113

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER  1984

SOUTHERN INDIANA GAS & ELEC: A.B. BROWN 1  (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION
                                              X REMOVAL   PER  BOILER  FGD   CAP.
                                              S02  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         DURING THE  TURBINE-GENERATOR OUTAGE,  WHICH LASTED UNTIL MAY 12, THE CAST-
                         IRON TEES ADJACENT  TO  THE  DOWNSTREAM  SIDE OF THE REGENERATION PUMP
                         DISCHARGE VALVES  WERE  REPLACED  WITH A HIGH DENSITY PLASTIC MATERIAL.  THIS
                         ACCOUNTED FOR 46  HOURS OF  DOWN  TIME.

                         TWO INSTANCES ACCOUNTING FOR SOME ADDITIONAL OUTAGE TIME WAS CAUSED BY
                         A MALFUNCTION OF  THE  LIME  TRANSFER SYSTEM.

                         A PROBLEM WITH  THE  LIME REACTOR PH MEASUREMENT SYSTEM AND THE REPAIR OF
                         A RECIRCULATION PUMP ACCOUNTED  FOR ADDITIONAL SYSTEM DOWN TIME.
  6/81
        A
        B
        SYSTEM
 99.9
 99.8
 99.9
99.2
98.1
98.6
99.2
99.1
99.1
99.6
96.5
97.0
720   708
                                                                                           699 63.0
        *»  PROBLEMS/SOLUTIONS/COMMENTS
                          DURING JUNE  RECIRCULATION PUMP TRIPS ACCOUNTED FOR THE UNAVAILABILITY.

                          THE  LIME  SLAKERS,  THE LIME TRANSFER SYSTEM AND THE ROTARY VACUUM FILTERS
                          WERE  CONSTANT PROBLEMS DURING THE MONTH BUT THE SPARE CAPACITY ENABLED
                          CONTINUED OPERATION.
  7/81
        A
        B
        SYSTEM
100.0
 82.8
 91.4
91.3
77.4
84.3
96.3
78.9
87.4
91.3
77.4
84.3
                                                                              744   744
                                                                                           627 62.5
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          DURING JULY,  THE B MODULE WAS UNAVAILABLE FOR 128 HOURS AS A RESULT
                          OF  PROBLEMS WITH THE RECIRCULATION PUMPS. REPLACEMENT LINERS HAD NOT BEEN
                          RECEIVED.
  8/81
        A
        B
        SYSTEM
 99.9
 84.7
 92.3
97.0
81.8
89.4
97.0
81.8
89.4
96.6
81.5
89.0
                                                                              744   741
             662 52.6
        #* PROBLEMS/SOLUTIONS/COMMENTS
                          THE UNAVAILABILITY OF THE B MODULE DURING THE MONTH RESULTED FROM CONTIN-
                          UING PROBLEMS WITH THE RECIRCULATION PUMP LINERS.

                          FREQUENT BREAKDOWNS OF THE LIME PROCESSING EQUIPMENT (SLAKER AND PNEUMATIC
                          TRANSFER SYSTEM) LED TO NUMEROUS SHORT TERM PERIODS DURING THE MONTH
                          WHEN THE FLUE GAS WAS NOT TREATED.
  9/81
        A
        B
        SYSTEM
 97.5
 97.5
 97.5
97.3
97.3
97.3
97.3
90.3
90.3
90.3
90.3
90.3
720   668    650  45.5
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE BOILER WAS TAKEN OFF LINE ON THE WEEKEND OF SEPTEMBER 18 TO FIX SEVERAL
                          STEAM LEAKS.  THE UNIT CAME BACK ON LINE ON SEPTEMBER 21, BUT THE LIME
                          REACTOR AGITATOR MOTOR WOULD NOT OPERATE AND REQUIRED REPLACEMENT.
                          THIS ACCOUNTED FOR THE FGD SYSTEM UNAVAILABILITY DURING THE MONTH.
 10/81   A
        B
        SYSTEM
 98.2
 98.2
 98.2
94.4
93.0
93.7
94.4
93.8
94.1
85.0
83.8
84.4
744   670    628  53.0
                                             13-1114

-------
                                                  UTILITY FGD  SURVEY:  OCTOBER  1983 - SEPTEMBER 1984

SOUTHERN INDIANA GAS k ELEC: A.B. BROWN  1  (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR


      **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING OCTOBER NUMEROUS INSTANCES OF LIME SLAKER AND LIME TRANSFER SYSTEM
                         PROBLEMS OCCURRED.

11/81 A           96.0         92.9        92.9        92.9
      B           90.3         88.9        88.9        88.9
      SYSTEM       92.6         90.9        90.9        90.9                  720   720    654  49.2

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING NOVEMBER PROBLEMS WERE ENCOUNTERED WITH THE THICKENER  RAKE.

                         ADDITIONAL OUTAGE  TIME DURING THE MONTH WAS CAUSED BY RECIRCULATION PUMP
                         FAILURES.

                         ISOLATION DAMPER PROBLEMS CAUSED THREE HOURS OF DOWN TIME.

12/81 A           95.0         67.4        67.4        41.3
      B          100.0         57.9        57.9        35.5
      SYSTEM       97.5         62.7        62.7        38.4                  744   456    286  32.0

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING DECEMBER THE BOILER WAS SHUT DOWN FOR APPROXIMATELY TWO WEEKS.

                         ISOLATION DAMPER PROBLEMS CONTINUED TO BE A PROBLEM DURING DECEMBER.

                         FGD SYSTEM OPERATION WAS INTERRUPTED SEVERAL TIMES BY THE PNEUMATIC LIME
                         TRANSFER SYSTEM.

  1/82  A           89.5         81.8        81.8        81.7
       B           89.5         76.0        76.0        75.9
      SYSTEM       89.5         78.9        78.9        78.8                  744   743    586  46.7

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE 78 HOURS OF UNAVAILABLE TIME IN JANUARY WAS DUE TO FROZEN WATER SUPPLY
                         LINES FOR THE LIME SLAKERS.

  2/82  A           94.0         64.6        84.6        68.4
       B          100.0         93.7        93.7        75.7
       SYSTEM       97.0         89.2        89.2        72.1                  672   543    484  38.1

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS OUT OF SERVICE FOR 107 HOURS DURING FEBRUARY DUE TO A
                         LEAK IN THE PLANT IN-COMING WATER SUPPLY PIPE.

  3/82  A          100.0         98.2        98.2        71.6
       B          100.0         78.3        78.3        56.2
      SYSTEM      100.0         89.0        89.0        63.9                  744   534    475  35.5

      *«  PROBLEMS/SOLUTIONS/COMMENTS

                         A SCHEDULED UNIT OUTAGE BEGAN ON MARCH 23 AND IS SCHEDULED THRU APRIL.
                         NO MAJOR WORK IS REQUIRED ON THE FGD SYSTEM.

  4/82 A           92.5         90.2        90.2        81.9
      B           96.3         93.2        93.2        84.6
      SYSTEM       94.4         91.7        91.7        83.2                  720   654    599  55.0
                                            13-1115

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER  1984

SOUTHERN INDIANA GAS i ELEC: A.B. BROWN  1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING  APRIL THE SYSTEM WAS FORCED DOWN PART OF THE TIME DUE TO A BROKEN
                         OIL DRAIN  LINE ON  THE  THICKENER.

                         OUTAGE  TIME WAS DUE  TO AN  INLET ISOLATION DAMPER AND BOOSTER FAN INLET
                         DAMPER  PROBLEM.

 5/82  A          100.0        97.6        97.6        89.0
       B          100.0        100.0      100.0        92.2
       SYSTEM     100.0        98.8        98.8        90.6                  744   678    674  43.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING  MAY NO MAJOR  FGD-RELATED PROBLEMS WERE ENCOUNTERED.

 6/82  A            97.4        96.8        96.8        96.0
       B            97.4        96.8        96.8        96.0
       SYSTEM       97.4        96.8        96.8        96.0                  720   714    691  42.0

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT  NO  MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING  JUNE.

 7/82  N            99.2        97.3        97.3        96.0
       S            99.2        99.2        99.2        97.8
       SYSTEM       99.2        98.2        98.2        96.9                  744   734    721  44.2

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT  NO  MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING  JULY.

 8/82  N          100.0        100.0      100.0       100.0
       5            97.6        85.6        97.3        85.6
       SYSTEM       93.8        92.8        98.6        92.8                  744   744    690  45.3

       ** PROBLEMS/SOLUTIONS/COMMEMTS

                         THE UTILITY REPORTED THAT  NO  MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING  AUGUST.

  9/82  N            98.9        97.3        97.3        42.4
       S            98.2        95.7        95.7        41.7
       SYSTEM       98.5        96.5        96.5        42.1                  720   314    303  20.8

       ## PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS  DOWN  FROM SEPTEMBER 10 TO SEPTEMBER 27 FOR A SCHEDULED OUTAGE.

 10/82  N          100.0        100.0       100.0       100.0
       S          100.0        100.0       100.0       100.0
       SYSTEM     100.0        100.0       100.0       100.0                  744   744    744  57.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DUPIN3  OCTOBER.

 11/82  N          100.0        100.0       100.0       100.0
       S            96.4        96.4       100.0        96.4
       SYSTEM       98.2        98.2       100.0        98.2                  720   720    707  87.9
                                             13-1116

-------
                                                  UTILITY  F6D  SURVEY:  OCTOBER  1983  -  SEPTEMBER

SOUTHERN INDIANA GAS S ELEC: A.B. BROWN 1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY  OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD   CAP.
                                                                S02   PART.  HOURS  HOURS   HOURS  FACTOR


      «*  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED  NO MAJOR FGD-RELATED PROBLEMS
                         DURING NOVEMBER.

12/82 N           96.9        96.9        96.9        96.9
      S           96.*        96.*        96.*        96.*
      SYSTEM       96.6        96.6        96.6        96.6                  7**    7**     719  68.*

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED  THAT NO  MAJOR FGD-RELATED  PROBLEMS  WERE ENCOUNTERED
                         DURING DECEMBER.

 1/83 N           98.9        98.9        98.9        98.9
      S           98.7        98.7        98.7        98.7
      SYSTEM       98.8        98.8        98.8        98.8                  7**    7**     735  57.1

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED  PROBLEMS WERE REPORTED BY  THE UTILITY
                         DURING JANUARY.

 2/83 N          100.0       100.0      100.0       100.0
      S          100.0       100.0      100.0       100.0
      SYSTEM      100.0       100.0      100.0       100.0                  672    672     672  51.3

      «*  PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED  PROBLEMS WERE ENCOUNTERED  BY  THE UTILITY
                         DURING FEBRUARY.

 3/83 N          100.0       100.0      100.0       100.0
      S          100.0       100.0      100.0       100.0
      SYSTEM      100.0       100.0      100.0       100.0                  7**    7**     7**  5*.8

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED  THAT NO MAJOR FGD-RELATED  PROBLEMS  WERE ENCOUNTERED
                         DURING MARCH.

 */B3 SYSTEM       *8.1        67.*        67.*        *8.1                  720    513     3*6   36.6

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  FGD SYSTEM WAS SHUT DOWN ONE WEEK PRIOR TO  A BOILER  OUTAGE  IN APRIL.
                         DURING THE SHUT-DOWN, A MAJOR REWORKING OF  THE  FGD SYSTEM WAS  PERFORMED.

                         INCLUDED IN THE FGD SYSTEM REWORKING WAS THE INSTALLATION OF A  HORIZONTAL
                         BELT VACUUM FILTER.

                         A NEW THICKENER TANK  WALL EXTENSION AND RAKE WERE INSTALLED DURING THE FGD
                         SYSTEM REWORKING.

                         NEW  UNDERFLOW, LIME SLURRY, AND SUMP PUMPS  WERE INSTALLED DURING THE  FGD
                         SYSTEM REWORKING.

                         MODIFICATIONS WERE MADE TO THE LIME SLAKING AREA DURING THE FGD SYSTEM
                         REWORKING.

 5/83 N           62.5        80.7        80.7        62.5
      S           62.5        80.7        80.7        62.5
      SYSTEM       62.5        80.7        80.7        62.5                  7**   576     *65  37.7
                                            13-1117

-------
7/83


8/83


N
S
SYSTEM
N
S
SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
98.8
98.8
98.8
100.0
100.0
100.0
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER  1984

SOUTHERN INDIANA GAS & ELEC: A.B. BROWN  1  (CONT.)
_-_.	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM REWORKING OUTAGE WAS COMPLETED DURING MAY, FIVE DAYS AFTER
                         START-UP OF THE BOILER.

 6/83  N           99.9         99,9         99.9         98.3
       S           94.6         94.5         94.5         93.1
       SYSTEM      97.2         97.2         97.2         95.7                  720   709    689  52.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED  THAT  NO  MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING JUNE.
                                                                              744   735    735 61.0



                                                                              744   744    744 61.0

        **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE  UTILITY REPORTED  THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                          DURING  JULY AND  AUGUST 1983.

  9/83  N           67.9        75.1         75.1        67.9
        S           67.9        75.1         75.1        67.9
        SYSTEM      67.9        75.1         75.1        67.9                  720   651    489 59.3

        »*  PROBLEMS/SOLUTIONS/COMMENTS

                          A SCHEDULED FGD  SYSTEM OUTAGE OCCURRED FROM SEPTEMBER 19 TO 28.

                          NEW  EQUIPMENT AND  PIPING TIE-INS WERE INSTALLED DURING SEPTEMBER TO MAIN-
                          TAIN AVAILABILITY  AND RELIABILITY.

 10/83  N          100.0        99.9         99.9        99.9
        S          100.0        99.9         99.9        99.9
        SYSTEM     100.0        99.9         99.9        99.9                  744   744    743 70.1

        **  PROBLEMS/SOLUTIONS/COMMENTS

                          BOTH MODULES  WERE  FORCED OUT OF SERVICE DURING PART OF OCTOBER DUE TO PLUG-
                          GAGE AT THE THICKENER TANK UNDERFLOW LINE.

 11/83  N          100.0        100.0        100.0        99.6
        S          100.0        100.0        100.0        99.6
        SYSTEM     100.0        100.0        100.0        99.6                  720   717    717 72.3

        **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE  UTILITY REPORTED  THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                          DURING  NOVEMBER  1933.

 12/83  N           26.6        16.4         16.4         7.3
        S           28.5        16.4         16.4         7.3
        SYSTEM      27.6        16.4         16.4         7.3                  744   330     54  26.1
                                             13-1118

-------
                                                  UTILITY F6D  SURVEY:  OCTOBER  1983 - SEPTEMBER  198*

SOUTHERN INDIANA GAS & ELEC'- A.B. BROWN 1  (CONT.)
	PERFORMANCE DATA	
PERIOD  MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD    CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR


       «*  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UNIT EXPERIENCED PRECIPITATOR HOPPER FREEZING  PROBLEMS DURING THE
                         MONTH WHICH DELAYED FGD SYSTEM USAGE.

                         A MAJOR BOILER AND FGD OUTAGE OCCURRED IN DECEMBER.  THE FGD SYSTEM
                         EXPERIENCED A CHEMICAL IMBALANCE PROBLEM THAT CAUSED SOLID CARRYOVER TO THE
                         ABSORBERS.   THE PROBLEM WAS RESOLVED IN JANUARY 1984.

                         DAMPER FREEZING PROBLEMS HERE REPORTED DURING DECEMBER.

                         FREEZING UNDERFLOW IN THE THICKENER TANK RECIRCULATION LINE CONTRIBUTED TO
                         FGD  SYSTEM DOWN TIME DURING THE MONTH.

 1/84  N           99.6        77.1        77.1        69.8
       S           99.6        77.1        77.1        69.8
       SYSTEM      99.6        77.1        77.1        69.8                  744   673    519  55.1

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED PROBLEMS WITH THE NEWLY INSTALLED MODULATING DAMPERS.

                         THE  FGD SYSTEM WAS DOWN DURING THE FIRST PART OF JANUARY DUE TO A SOLID
                         CARRYOVER PROBLEM IN THE ABSORBERS. THE RATIOS AND LEVELS OF CHEMICALS
                         "WERE SUCH THAT SOLID FORMATION WAS NOT SUFFICIENT TO ALLOW PROPER
                         SETTLING.

 2/84  N          100.0       100.0       100.0       100.0
       S          100.0       100.0       100.0       100.0
       SYSTEM     100.0       100.0       100.0       100.0                  696   696    696  58.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED DURING FEBRUARY.

 3/84  N           99.7        99.7        99.7        99.7
       S           99.7        99.7        99.7        99.7
       SYSTEM      99.7        99.7        99.7        99.7                  744   744    742  75.2

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH, BOTH FD FANS TRIPPED ON A FALSE HIGH BEARING TEMPERATURE
                         ALARM.

 4/84  N           43.1        99.7       100.0        42.9
       S           42.9        99.4        99.7        42.8
       SYSTEM      43.0        99.5        99.8        42.8                   720   310    309  32.6

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A SPRING OUTAGE CONTINUED THROUGH APRIL DUE TO STACK  LINER REPAIRS.

 5/84  N             .0                                   -°
       S             .0                                   -0
       SYSTEM        .0                                   -0                   744      0       0    .0

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED A BOILER OUTAGE DURING MAY.

 6/84  N           80.0        83.5        83.5        61.1
       S           60.0        83.5        83.5        61.1
       SYSTEM      80.0        83.5        83.5        61.1                   720    527    440   49.1
                                            13-1119

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984




SOUTHERN INDIANA GAS S. ELEC: A.B. BROWN 1 (CONT.)
PERIOD
7/8*


8/84


MODULE
N
B
SYSTEM
N
S
SYSTEM
AVAILABILITY
99.5
99.5
99.5
97.3
99.6
98.5
OPERABILITY
100.0
100.0
100.0
97.3
99.6
98.5
	 -rcKruirrmr
RELIABILITY
99
99
99
97
99
98
.5
.5
.5
.3
.6
.5
UTILIZATION
97
97
97
97
99
98
.4
.4
.4
.3
.6
.5
X REMOVAL PER
502 PART. HOURS


744


744
BOILER
HOURS


722


744
FGD
HOURS


725


733
CAP.
FACTOR


56.9


56.4
       ** PROBLEMS/SOLUTIONS/COMMENTS




                         NO MAJOR FGD RELATED PROBLEMS WERE ENCOUNTERED IN JUNE THROUGH AUGUST.




 9/84  SYSTEM                                                                720




       «* PROBLEMS/SOLUTIONS/COMMENTS




                         INFORMATION WAS UNAVAILABLE FOR SEPTEMBER 1984.
                                            13-1120

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
                                           SECTION 13
              DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE  EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT  GENERATING CAPACITY W/FGD - MW
NET UNIT  GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT  DATA - BOILER AND STACK
     BOILER  SUPPLIER
     BOILER  TYPE
     BOILER  SERVICE LOAD
     DESIGN  BOILER FLUE GAS FLOW - CU.M/S
     BOILER  FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL  DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     HAN3E  ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE  SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE  CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 «* MECHANICAL COLLECTOR
     NUMBER
     TYPE

 ** ESP
     NUMBER
     NUM2ER  OF SPARES
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE  NAME/COMMON NAME
     SHELL  GENERIC MATERIAL
     SHELL  SPECIFIC MATERIAL
     LINER  GENERIC MATERIAL
     LINER  SPECIFIC MATERIAL
     GAS  CONTACTING DEVICE TYPE

*** FGD SYSTEM
               (  .100 LB/MMBTU)
               ( 1.200 LB/MMBTU)
               (  .700 LB/MMBTU)
SPRINGFIELD CITY UTILITIES
SOUTHWEST
1
SPRINGFIELD
MISSOURI
D
   43.
  516.
  301.
  173
  194
  173
  182
  194
RILEY STOKER
PULVERIZED COAL
BASE
  375.16       t 795000 ACFM)
  165.6        ( 330 F)
  117.         ( 385 FT)
CONCRETE
    3.7        ( 12.0 FT)
               ( 11000 BTU/LB)
                10500-12500
COAL
BITUMINOUS
25586.

   12.00
10.0-22.0
    9.00
6.0-12.0
    3.50
2.5-4.5
      .30
******
 0
NONE
 1
 0
COLD SIDE
AIR CORRECTION DIVISION, UOP
  375.2        ( 795000 ACFM)
  148.9        (  300  F)
     .1        (  1. IN-H20)
   99.7
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                             13-1121

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SPRINGFIELD CITY UTILITIES: SOUTHWEST 1 (CONT.)
 ** GENERAL DATA
     SALEABLE PRCDUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY - X
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED
THROWAWAY PRODUCT
WET SCRUBBING
LIMESTONE
ADIPIC ACID
AIR CORRECTION DIVISION,
BURNS t MCDONNELL
FULL SCALE
NEW
   99.70
   80.00
    4.6
 1
 9/77
 4/77
 8/73
UOP
 ** DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X                 2.95
     DESIGN COAL HEAT CONTENT - J/G             25697.6
     DESIGN COAL ASH CONTENT - X                   11.01
     DESIGN MOISTURE CONTENT - X                   14.00
     DESIGN CHLORIDE CONTENT - X                     .30
     SPACE REQUIREMENTS - SQ M                   1393.5
     OPER. & MAINT. REQUIREMENT - MANHR/DAY       105.0
               ( 11048 BTU/LB)
               (  15000 SQ FT)
 ** QUENCHER/PRESATURATOR
     NUMBER
     TYPE
     SUPPLIER
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUM3ER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS  - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     DISTANCE BETWEEN GAS CONTACTING ZONES - CM
     LIQUID RECIRCULATION RATE -  LITER/S
     L/G RATIO - L/CU.M
     SUPERFICAL  GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X
QUENCH DUCT
AIR CORRECTION DIVISION, UOP
  165.16       ( 350000 ACFM)
  165.6        (  330 F)
CARBON STEEL
ASTM A-36
 2
 0
TRAY TOWER
NR
NR
AIR CORRECTION DIVISION, UOP
16 X 30 X 54.5 [QUENCHER]; 13 X 30 X 12 [ABSORBS
CARBON STEEL
ASTM A-36
N/A
ORGANIC
SYNTHETIC RUBBER
NEOPRENE LS-576
TRAYS
 3
  121.9        (   48.0IN)
  619.         (13000 GPM)
    5.2        ( 39.1 GAL/1000 ACF)
    3.0        (10.0 FT/S)
  156.91       ( 332500 ACFM)
   57.2        (  135 F)
   85.0
  ** MIST ELIMINATOR
      PRE-MIST ELIMINATOR/MIST  ELIMINATOR
      NUMBER  PER  SYSTEM
      NUMBER  OF SPARES PER  SYSTEM
      NUMBER  PER  MODULE
      GENERIC TYPE
      SPECIFIC TYPE
      TRADE NAME/COMMON TYPE
      MANUFACTURER
      CONFIGURATION
      NUMBER  OF STAGES
PRIMARY COLLECTOR
 2
 0
 1
IMPINGEMENT
BAFFLE
CLOSED VANE
UOP
HORIZONTAL
     2
                                             13-1122

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER 1984
SPRINGFIELD CITY UTILITIES:  SOUTHWEST 1 (CONT.)

     NUMBER OF PASSES  PER  STAGE
     DISTANCE BETWEEN  STAGES - CM
     DISTANCE BETWEEN  VANES  - CM
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH  WATER SOURCE
     WASH  FREQUENCY
     WASH  RATE - L/S

 «« REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 «* FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE  GAS  FLOW  RATE - CU.M/S
     FLUE  GAS  TEMPERATURE -  C
     CONSTRUCTION MATERIAL GENERIC TYPE

 »* DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC  TYPE
     MANUFACTURER
     SEAL  AIR  FLOW  - CU. M/S
     SERVICE CONDITIONS
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC  MATERIAL  TYPE
     LINER SPECIFIC MATERIAL TYPE

 *« DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC  TYPE
     MANUFACTURER
     SEAL  AIR  FLOW  -  CU. M/S
     SERVICE CONDITIONS
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC  MATERIAL  TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUM2ER
     FUNCTION
     GENERIC TYPE
     SPECIFIC  TYPE
     MANUFACTURER
     SEAL  AIR  FLOW  -  CU. M/S
     SERVICE CONDITIONS
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC  MATERIAL  TYPE
     LINER SPECIFIC MATERIAL TYPE

 «* DUCTWORK
     LOCATION
     CONFIGURATION
    3
    1.52       (  .6 IN)
    2.5        ( 1.00 IN)
    3.0        ( 10.0 FT/S)
ORGANIC
FIBER-REINFORCED POLYESTER
FRESH
CONTINUOUS
    6.9        (  110 GAL/MIN)
NONE
N/A
N/A
NONE
N/A
 2
 0
CENTRIFUGAL
GREEN FAN
UNIT
FORCED DRAFT
DRY
  192.06       ( 407000 ACFM)
  168.3        (  335 F)
CARBON STEEL
SHUT-OFF
LOUVER
PARALLEL BLADE MULTILOUVER
AMERICAN WARMING » VENTILATING
     .00       (      0 ACFM)
335
CARBON STEEL
AISI 1110
NONE
N/A
SHUT-OFF
LOUVER
PARALLEL BLADE MULTILOUVER
AMERICAN WARMING ft VENTILATING
      .00       (      0 ACFM)
335
CARBON STEEL
AISI  1110
NONE
N/A
SHUT-OFF
LOUVER
PARALLEL BLADE MULTILOUVER
AMERICAN WARMING ft VENTILATING
      .00       (      0 ACFM)
161
HIGH  ALLOY
IRON  BASE/NICKEL-CHROMIUM-COPPER-MOLYBDENUM
NONE
N/A
INLET
RECTANGULAR
                                            13-1123

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SPRINGFIELD CITY UTILITIES: SOUTHWEST 1 (CONT.)
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 »* DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 *» REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER
     NUMBER OF SPARES
     FULL  LOAD DRY FEED CAPACITY - M.TONS/HR
     PRODUCT QUALITY - X SOLIDS

 «« TANKS
     SERVICE
      REAGENT  PREP  PRODUCT
      ABSORBER  RECYCLE
      MIST  ELIMINATOR WASH
      PRESATURATOR
      BALL  MILL SUMP
      SLURRY DRAW-OFF SUMP
      SUPERNATANT
      WASH  WATER RETURN

  **  PUMPS
      SERVICE
      ABSOPBER  RECIRCULATION
      MIST ELIMINATOR  WASH
      THICKENER FEED
      SLURRY FEED
      SLUPRY TRANSFER-
      PRESATURATOR  WATER-TRAP  OUT  TRAY WAS
      SLUDGE TRANSFER
      WASH WATER RETURN
      SUPERNATANT

  ** SOLIDS CONCENTRATING/DEWATERING
      DEVICE
      NUMBER
      NUMBER OF SPARES
      DIMENSIONS -  FT
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL  TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL  TYPE
      BELT GENERIC  MATERIAL TYPE
      BELT SPECIFIC MATERIAL TYPE
      FEED STREAM SOURCE
153 IN. HEIGHT X 93.5 IN. WIDTH
CARBON STEEL
ASTM A-36
NONE
N/A
                 96 IN. WIDTH
BYPASS
RECTANGULAR
135 IN. HEIGHT X
CARBON STEEL
ASTM A-36
NONE
N/A
OUTLET
RECTANGULAR
109 IN. HEIGHT X 101.5 IN. WIDTH
CARBON STEEL
ASTM A-36
ORGANIC
GLASS FLAKE-FILLED POLYESTER
WET BALL MILL
COMPARTMENTED
TUBE MILL
KENNEDY VAN SAUN
               (   8 TPH)
    7.3
   65.0
NUMBER

   1
   2
   1
   1
   1
   1
   1
   1
                                                NUMBER
VACUUM FILTER
 1
0
38.6 X 13.0
CARBON STEEL
AISI 1110
NONE
N/A
CLOTH
N/A
THICKENER UNDERFLOW
                                             13-1124

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER
SPRINGFIELD CITY UTILITIES:  SOUTHWEST 1 (CONT.)

     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM  DISPOSITION

 ** SOLIDS CONCENTRATING/DEMATERING
     DEVICE
     NUMBER
     NUMBER OF  SPARES
     CONFIGURATION
     DIMENSIONS - FT
     CAPACITY
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OVERFLOW  STREAM  CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW  STREAM  DISPOSITION

 **» SLUOSE

 »* TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS
     INLET QUALITY  -  X

 ** DISPOSAL
     NATU3E
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT

 »* PROCESS  CONTROL  AND INSTRUMENTATION
     PROCESS  STREAM
     CHEMICAL  PARAMETERS
     PHYSICAL  VARIABLES
     CONTROL  LEVELS
     MONITOR  TYPE
     MONITOR  LOCATION
     PROCESS  CONTROL MANNER
     PROCESS  CHEMISTRY MODE

 *» WATER BALANCE
     WATER  LOOP TYPE

 ** CHEMICALS  AND CONSUMPTION
     FUNCTION
     NAME
     PRINCIPAL CONSTITUENT
     SOURCE/SUPPLIER
     CONSUMPTION
     UTILIZATION -  X
     POINT OF  ADDITION

 ** FGD SPARE  CAPACITY INDICES
     ABSORBER  - 7.
     MIST ELIMINATOR - X
     FAN -  X
     BALL MILL - X
     THICKENER - X
     VACUUM  FILTER - X
40-55X SOLIDS
70X SOLIDS
TO PUG MILL
TO THICKENER
THICKENER
 1
0
CIRCULAR
110 DIAMETER X 8.5 SIDEWALL, 15.7 CENTER DEPTH
860000
CARBON STEEL
AISI 1110
ORGANIC
BITUMASTIC
ABSORBER BLEED
15X SOLIDS
40-55X SOLIDS
1200 GPM
TO VACUUM FILTER
TO QUENCHER AND ME WASH
STABILIZATION
PUG MILL
N/A
   70.0
FINAL
LANDFILL
ON-SITE
TRUCK
CLAY LINING
PH
PH, SLURRY DENSITY
SLURRY DENSITY
PH 5.4-5.5
BECKMAN IN-LINE PROBE
RECYCLE SLURRY LINE
MANUAL
FEEDBACK
CLOSED
ABSORBENT
LIMESTONE
CAC03  IMAXIMUM OF  2X  INERTS1
COHCO, GRIESEMER
7 TPH
   89.0
BALL MILL
     ).0
      .0
      .0
      .0
      .0
      .0
                                             13-1125

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

SPRINGFIELD CITY UTILITIES: SOUTHWEST  1  (CONT.)
 »* FGD SPARE COMPONENT INDICES
     ABSORBER                                         .3
     MIST ELIMINATOR                                  .3
     FAN                                              .0
     BALL MILL                                        .0
     THICKENER                                        .0
     VACUUM FILTER                                    .0
__	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR


  0/77  SYSTEM

       **  PROBLEMS/SOLUTIONS/COMMENTS

                          INSTALLATION  OF THE  LIMESTONE  FGD SYSTEM WAS COMPLETED DURING THE FIRST
                          QUARTER  OF 1977 (BEHIND SCHEDULE, PRIMARILY BECAUSE OF DELAYS IN ELECTRIC-
                          AL  WORK).  FOLLOWING AIR/WATER TESTS AND CHECKOUT OF LIMESTONE PREPARATION
                          FACILITIES, THE FGD  PLANT WAS  STARTED UP IN EARLY APRIL 1977 FOR MECHANIC-
                          AL  SHAKEDOWN/DEBUGGING OPERATIONS WHICH CONTINUED THROUGHOUT THE SUMMER.
                          COMPLIANCE TESTING AND CERTIFICATION OF COMMERCIAL AVAILABILITY WERE SUC-
                          CESSFULLY COMPLETED  IN SEPTEMBER, JUST BEFORE A SCHEDULED 3-MONTH FALL
                          SHUTDOWN.  OPERATION OF THE  SYSTEM HAS BEEN HAMPERED BY A NUMBER OF PROB-
                          LEMS:  MIST ELIMINATOR PLUGGING (PIPING TO M.E. SPRAY SYSTEM HAS BEEN MOD-
                          IFIED),  CORROSION IN THE  PRESATURATOR (WAS RELINED WITH PRECRETE),
                          CORROSION OF  THE  INLET/OUTLET  GAS DAMPERS (REPLACED WITH 316 SS DAMPERS),
                          AND FAILURE OF PRECRETE LINING IN THE SCRUBBER AND CEILCOTE IN THE  STACK
                          (BOTH  FAILURES IDENTIFIED AS APPLICATION PROBLEMS).  THE UTILITY ALSO
                          FOUND  IT NECESSARY TO CHANGE THE SYSTEM PH CONTROL FROM 5.9 TO 5.6  TO
                          INCREASE LIMESTONE UTILIZATION AND DECREASE PLUGGING WITHIN THE SYSTEM.

  4/77  SYSTEM                                                                 720

       **  PROBLEMS/SOLUTIONS/COMMENTS

                          FGO OPERATIONS BEGAN IN EARLY  APRIL.  THE SYSTEM IS CURRENTLY EXPER-
                          IENCING  MIST  ELIMINATOR PLUGGING AND INSTRUMENTATION PROBLEMS.

  5/77  SYSTEM                                                                 744

  6/77  SYSTEM                                                                 720

       »*  PROBLEMS/SOLUTIONS/COMMENTS

                          THE SCRUBBER  EXPERIENCED  CORROSION IN THE PRESATURATOR AREAS THAT WILL
                          WILL REQUIRE  RELINING.

  7/77  SYSTEM                                                                 744

  8/77  SYSTEM                                                                 744

  9/77  SYSTEM                                                                 720

       **  PROBLEMS/SOLUTIONS/COMMENTS

                          THE FGD  SYSTEM WAS OPERATED  ROUGHLY 60X OF THE AUGUST-SEPTEMBER
                          PERIOD.  A NEW SOURCE PERFORMANCE TEST WAS RUN DURING THE SECOND WEEK OF
                          SEPTEMBER.   LATER, THE UNIT  WAS SHUT DOWN FOR THE FIRST TURBINE IN-
                          SPECTION.

10/77  SYSTEM                                                                 744
                                             13-1126

-------
                                                 UTILITY  F6D SURVEY: OCTOBER  1983  - SEPTEMBER  1984

SPRINGFIELD CITY UTILITIES: SOUTHWEST  1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION   X  REMOVAL   PER   BOILER   FGD   CAP.
                                                                502   PART.  HOURS  HOURS  HOURS  FACTOR


      «* PROBLEMS/SOLUTIONS/COMMENTS

                         A SCHEDULED OCTOBER-NOVEMBER OUTAGE WAS  INITIATED.   THE UNIT IS SCHEDULED
                         TO  START UP AGAIN IN JANUARY.

                         DURING  OCTOBER  THE OUTLET DAMPERS WERE MODIFIED.   THE 316 SS DAMPERS WERE
                         REPLACED WITH 316L SS DAMPERS.

                         THE PRESATURATOR  WAS RELINED WITH HIGH MOLYBDENUM STEEL AS A RESULT
                         OF  THE  PRECRETE FAILURE NOTED EARLIER  (JUNE).

                         OUTLET  DUCTWORK WAS RELINED  WITH  CEILCOTE  DURING  THE OUTAGE.

                         HOLLOW  PACKING  BALLS WERE REPLACED WITH  HEAVIER WALLED  PLASTIC  BALLS.
                         THE BALLS WERE  RUPTURING  AND FILLING WITH  SLURRY  MAKING THEM INEFFECTIVE.

                         LEAKING AROUND  OUTLET DAMPERS WAS MINIMIZED BY  SEAL-AIR FANS.

11/77 SYSTEM                                                                 720

12/77 SYSTEM                                                                 744

      *« PROBLEMS/SOLUTIONS/COMMENTS

                         THE PLANT SHUTDOWN CONTINUED UNTIL JANUARY 28 WHEN THE  BOILER RESTARTED.
                         THE FGD SYSTEM  WAS EXPECTED  TO BE PUT  BACK ON LINE IN FEBRUARY  1978.
                         DURING  THE OUTAGE ALL REMAINING MODIFICATIONS TO  THE FGD SYSTEM WERE COM-
                         PLETED.

 1/78 SYSTEM                                                                 744

 2/78 SYSTEM                                                                 672

      ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE ABSORBERS DID NOT OPERATE DUE TO AN  EXPANSION JOINT FAILURE BETWEEN
                         THE ID  FAN AND  THE ABSORBERS.

                         THE ABSORBERS ARE CURRENTLY  BEING BY-PASSED. THE FGO SYSTEM IS EXPECTED
                         TO  BE BACK ON  LINE BY THE END OF  APRIL.

 3/78 SYSTEM                                                                 744

 4/78 SYSTEM                                                                 730

      ** PROBLEMS/SOLUTIONS/COMMENTS

                         ONLY ONE ABSORBER MODULE  IS  CURRENTLY  OPERATING.   THE  EXPANSION
                         JOINT FAILURE MENTIONED  PREVIOUSLY WAS DIRECTLY RELATED TO  THE  DAMPER
                         FAILURE WHICH DIRECTED THE BOILER FLUE GAS TO THE SEALED OFF  FGD
                         SYSTEM.

                         THE DAMPER LOUVERS HAVE  BEEN STICKING.  THERE ARE NO MANUAL CONTROLS FOR
                         THE DOUBLE LOUVER DAMPERS SO THAT WHEN INSTRUMENTATION FAILURES OCCUR  THE
                         UNIT MUST BE SHUT DOWN.   OF  THE 12 DAMPERS (6 PAIRS) ON THIS  SYSTEM 6
                         HAVE BEEN REBUILT.

                         AN  FRP  LINER FAILURE OCCURRED DURING THIS  PERIOD.

                         A PUMP  FAILURE  OCCURRED  DURING THE PERIOD.  THE PROBLEM DOES  NOT
                         APPEAR  TO BE SEVERE.

 5/78 SYSTEM
                                            13-1127

-------
UTILITY FGD SURVEY: OCTOBER 1933 - SEPTEMBER  1984

SPRINGFIELD CITY UTILITIES: SOUTHWEST  1  (CONT. )
__„	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR
 6/78  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
                                                                              720
                          THE S-l  MODULE  RAN STEADILY FOR OVER 11 DAYS.  THE S-2 MODULE WAS STILL
                          DOWN WITH  EXPANSION JOINT PROBLEMS.

                          DURING THE MONTH  THE MIST ELIMINATOR WASH SYSTEM WAS ALTERED FROM A SEPAR-
                          ATE CLOSED LOOP FOR EACH MODULE TO A COMMON SYSTEM FOR BOTH MODULES.  THE
                          NEW SYSTEM TAKES  SUPERNATANT FROM THE TOP OF THE THICKENER FOR MIST ELIM-
                          INATOR SPRAY.

                          INSTRUMENTATION PROBLEMS WERE ENCOUNTERED DURING THE MONTH.  PH PROBES
                          WERE  LOST, THE  MAG-FLOW METER FOR LIMESTONE SLURRY FAILED, AND THE AUTO-
                          MATIC GAS  ANALYZERS DID NOT OPERATE PROPERLY.

                          SOME  PIPES EXPERIENCED PLUGGING DUE TO NEOPRENE PEELING FROM VALVES.  IT
                          IS EXPECTED THAT  VALVE REPAIR OR REPLACEMENT SHOULD STOP THE PLUGGING.

                          THE SLUDGE SYSTEM EXPERIENCED SOME FILTER BELT PROBLEMS DURING THE MOUTH.
                          REPAIRS  WERE MADE BUT INSUFFICIENT SLUDGE HAS BEEN GENERATED TO DETERMINE
                          IF THE PROBLEMS HAVE BEEN SOLVED.
  7/78   S-l
        S-2
        SYSTEM
16.7
  .0
 8.3
16.7
  .0
 8.3
16.7
  .0
 8.3
16.7
  .0
 8.3
744   744
62  70.1
        ** PROBLEMS/SOLUTIONS/COMMENTS
                           PROBLEMS WERE ENCOUNTERED WITH THE S-l MODULE TRANSFER PUMPS.  NINE DAYS
                           WERE  REQUIRED TO TRACE THE ELECTRICAL-RELATED PROBLEM.

                           A 17-DAY OUTAGE WAS CAUSED BY PROBLEMS WITH THE BALL MILL AIR SUPPLY WHICH
                           RESULTED IN THE UNAVAILABILITY OF SLURRY.

                           THE S-2 MODULE WAS STILL DOWN IN JULY WHILE THE UTILITY WAITED FOR THE
                           REPLACEMENT EXPANSION JOINT.

                           WORK  WAS DONE DURING THE MONTH TO IMPROVE THE INSTRUMENTATION.  IT WAS
                           DISCOVERED THAT MANY OF THE PROBLEMS WERE DUE TO SCALE ACCUMULATION ON THE
                           PROBES.
  8/78  S-l
        S-2
        SYSTEM
59.0
  .0
29.5
59.0
  .0
29.5
59.0
  .0
29.5
59.0
  .0
29.5
744   744    220  56.6
        *# PROBLEMS/SOLUTIONS/COMMENTS
                           THE S-2 MODULE REMAINED DOWN THROUGHOUT AUGUST BECAUSE THE REPLACEMENT
                           EXPANSION JOINT HAD NOT YET ARRIVED.

                           EXPANSION JOINT REPAIRS ON THE S-l MODULE SCRUBBER FORCED THE MODULE OUT
                           OF SERVICE FOR 84 HOURS.

                           PROBLEMS WITH THE THICKENER AND PLUGGED LINES FORCED THE S-l MODULE OUT
                           OF SERVICE FOR 211 HOURS.
  9/78   S-l
        S-2
        SYSTEM
22.1
  .0
11.1
28.6
  .0
14.3
28.6
  .0
14.3
22.1
  .0
11.1
                                                                              720   557
              80  49.1
                                             13-1128

-------
                                                  UTILITY FGD  SURVEY:  OCTOBER  1983  -  SEPTEMBER  1984
SPRINGFIELD CITY UTILITIES: SOUTHWEST  1  (CONT.)
	PERFORMANCE DATA	
PERIOD  MODULE AVAILABILITY  OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD    CAP.
                                                                S02   PART.  HOURS HOURS  HOURS  FACTOR


       **  PROBLEMS/SOLUTIONS/COMMENTS

                         CONTINUATION OF THE EXPANSION JOINT PROBLEM RESULTED IN THE  S-2 MODULE
                         REMAINING DOWN THROUGHOUT THE MONTH.

                         S-l MODULE DOWN TIME WAS DUE TO PLUGGING OF THE THICKENER  SLURRY MAKEUP
                         LINES AND FAILURE OF THE BALLS WITHIN THE  MODULE.

                         THE HEAVIER-WALLED PING PONG BALLS THAT WERE INSTALLED DURING  THE
                         DECEMBER 1977-JANUARY 1978 PERIOD  WERE REPLACED WITH 1.25  INCH DIAMETER
                         SOLID RUBBER BALLS DURING SEPTEMBER 1978.

10/78  SYSTEM         .0           .0          .0          .0                   744    26     0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE BOILER WAS DOWN FOR A SCHEDULED OUTAGE DURING THE  MONTH

                         CONSIDERABLE CLEANING OF THE S-l MODULE WAS DONE  AS THE LOWER  TWO LEVELS
                         OF THE MODULE HAD BEGUN TO PLUG WHEN THE BALLS FAILED  (SEE SEPTEMBER
                         1978).

                         A THOROUGH CLEANING OF THE ENTIRE  FGD SYSTEM OCCURRED  DURING THIS PERIOD.

                         A BEARING WAS REPLACED ON THE SLURRY DRAW  OFF PUMP.  WORK  WAS  ALSO
                         REQUIRED ON A WASTE DRAW OFF PUMP.

                         THE OUTLET DUCT WAS CLEANED AND A  PLASITE  LINER WAS INSTALLED.  REPAIR
                         WAS MADE TO THE BYPASS DUCT TOGGLE (A PAIR OF EXPANSION JOINTS WITH TWO
                         TO THREE FT. OF DUCT BETWEEN THEM) DUE TO  METAL DETERIORATION.

                         THE RUBBER COATING ON HOLD TANK AGITATORS  AND SLURRY STORAGE TANK
                         AGITATORS WERE REPAIRED.

                         MAINTENANCE WAS PERFORMED ON FANS, DAMPERS AND VALVES.

                         MAINTENANCE AND MODIFICATIONS TO THE INSTRUMENTATION HAVE  YIELDED SOME
                         IMPROVEMENT IN OPERATIONS.  SOME INSTRUMENTATION  PROBLEMS  RESULTED
                         FROM SCALE ACCUMULATION ON PROBES.  MODIFICATIONS TO THE PRESATURATOR
                         TEMPERATURE PROBES WHICH WERE COMPLETELY COATED WITH MATERIAL  ARE
                         EXPECTED TO PERMANENTLY RECTIFY THE PROBLEM IN THIS AREA.

                         THE FILTER BELTS HAVE STILL BEEN TEARING AS MENTIONED  EARLIER
                         (JUNE, 1978).  THERE HAVE BEEN PROBLEMS BOTH UPSTREAM  AND  DOWNSTREAM
                         OF THE FILTER BELTS IN THE SLUDGE  DISPOSAL SYSTEM.

                         THE UTILITY REPORTED THAT THERE HAS BEEN NO SIGN  OF SCALE  ACCUMULATION
                         ON THE MIST ELIMINATORS SINCE THE  WASH SYSTEM WAS MODIFIED AS  REPORTED
                         IN JUNE, 1978.
11/78  S-l
       S-2
       SYSTEM
            68.1

            51.5

*# PROBLEMS/SOLUTIONS/COMMENTS
64.7
22.4
43.6
64.7
22.4
43.6
64.3
22.3
43.3
720   716
312  52.1
                          THE  BOILER OUTAGE LASTED INTO THE FIRST PART OF NOVEMBER DURING WHICH
                          TIME SCRUBBER REPAIR WORK CONTINUED.

                          AN FGD OUTAGE WAS CAUSED BY A FAN BEARING FAILURE ON THE S-2 MODULE
                          DURING NOVEMBER.

                          ALL  DAMPERS WERE  SERVICED, REPAIRED AND EXERCISED.
                                            13-1129

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SPRINGFIELD CITY UTILITIES: SOUTHWEST 1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS FACTOR
13/78 S-l 45.2 32.9 32.9 29.7
S-2 81.7 76.2 76.2 68.7
SYSTEM 63.4 54.6 54.6 49.2


744 671 366 58.9
       ** PROBLEMS/SOLUTIONS/COMMENTS

                           PRESATURATOR  NOZZLE  PLUGGING  OCCURRED  IN THE S-l MODULE DURING DECEMBER.
                           AFTER THE  SPRAY  NOZZLES  WERE  REPLACED  FROZEN LINES PREVENTED MODULE
                           STARTUP.

                           SEVERAL  LINES BROKE  OR DEVELOPED  LEAKS AS A RESULT OF FREEZE UPS.

                           ALL  THE  MAJOR OUTAGES CAN BE  ATTRIBUTED TO THE COLD WEATHER.  THE SYSTEM
                           WAS  NOT  DESIGNED WITH DUE REGARD  TO WEATHER CONDITIONS.

                           ONE  OR TWO MINOR SCRUBBER SHUTDOWNS RESULTED FROM FROZEN INSTRUMENTATION.

  1/79 S-l            .0           .0           .0          .0
       S-2          42.6        47.3         47.3        29.0
       SYSTEM      21.3        24.9         24.9        14.5                  744   457    108  43.9

       *« PROBLEMS/SOLUTIONS/COMMENTS

                           THE  S-2  MODULE WAS UNAVAILABLE FOR 117 HOURS BECAUSE OF VALVE FREEZE-UPS.

                           FROZEN VALVES AND EQUIPMENT CONTRIBUTED TO THE OUTAGES OF THt S-l MODULE.

                           DURING THE FIRST 15  DAYS OF JANUARY THE SECOND BALL MILL WAS UNUSEABLE
                           BECAUSE  OF A  COMPRESSED  AIR SYSTEM FAILURE.  THIS RESULTED IN AN
                           INSUFFICIENT  LIMESTONE SLURRY SUPPLY TO THE S-l MODULE.

  2/79 S-l          28.7           .0           .0          .0
       S-2          24.2        32.0         32.0        24.2
       SYSTEM      26.5        16.0         16.0        12.1                  672   508    81  48.2

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE S-l MODULE EXPERIENCED PLUGGING PROBLEMS IN THE FIRST AND SECOND
                          STAGES DURING  FEBRUARY AND DID NOT OPERATE.  DUE TO FLUE GAS LEAKING  INTO
                          THE MODULE, ACCESS COULD  NOT BE OBTAINED TO CLEAN THE MODULE.

                          EXPANSION JOINT PROBLEMS  AND BROKEN LINES THROUGHOUT THE SYSTEM WERE
                          REPORTED.

                          SCRUBBING OPERATIONS  WERE HAMPERED DURING THE LATTER PART OF FEBRUARY
                          BECAUSE  OF  INSUFFICIENT  LIMESTONE  SLURRY.

                          THE S-2  MODULE PROBLEMS  INCLUDED FROZEN VALVES AND LINES.

  3/79  S-l          62.0         39.5        39.5        38.8
        S-2          55.1         14.0        14.0        13.7
        SYSTEM      58.6         26.8        26.8        26.3                  744   730    195  46.2

       »* PROBLEMS/SOLUTIONS/COMMENTS

                          THE MAJORITY  OF MODULE S-l DOWNTIME WAS DUE TO A BROKEN SUPERNATE LINE  AND
                          MAKEUP CROSS  TIE.

                          THE UTILITY REPORTED  THAT THE  MODULE WAS UNABLE TO RUN FOR A TIME DUE TO
                          A DESIGN PROBLEM WITH THE WESTINGHOUSE 500 HP MOTORS.

  4/79 S-l          42.6         30.9        30.9        18.5
                                             13-1130

-------
                                                 UTILITY  FGD  SURVEY:  OCTOBER  1983  -  SEPTEMBER  1984
SPRINGFIELD CITY UTILITIES: SOUTHWEST  1  (CONT. )
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD    CAP.
                                                                S02   PART.  HOURS  HOURS   HOURS  FACTOR
      s-2
      SYSTEM
51.6
47.1
45.0
38.0
45.0
38.0
27.0
22.8
                                                                             720    432
                                                                       164  28.4
       «*  PROBLEMS/SOLUTIONS/COMMENTS
                         MODULE  S-l  EXPERIENCED AN EXPANSION JOINT FAILURE  ON THE  ID  FAN  DIS-
                         CHARGE.

                         LOW DENSITY AT THE SLURRY HOLD TANK WAS A MAJOR PROBLEM.

                         SOME PLUGGING OF THE FIRST STAGE OF THE S-2 MODULE WAS REPORTED  BY  THE
                         UTILITY.
 5/79  S-l
       S-2
       SYSTEM
84.1
  .0
42.1
77.5
  .0
38.8
77.5
  .0
38.8
67.0
  .0
33.5
                                                                             744    644
                                                                                          249   37.0
       *» PROBLEMS/SOLUTIONS/COMMENTS
                         THE S-2 MODULE WAS NOT OPERATED DURING MAY DUE  TO A  BROKEN RECYCLE  TANK
                         AGITATOR SHAFT.  A NEW ONE HAS BEEN ORDERED.  RUBBER LINING OF  THE  SHAFT
                         AND REPAIR OF DAMAGED LINING ON THE IMPELLER  WILL BE DONE  ON SITE.
 6/79
       S-l
       S-2
       SYSTEM
55.0
  .0
27.5
53.0
  .0
26.5
53.0
  .0
26.5
52.9
  .0
26.5
                                                                             720    719
                                                                       191  53.8
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE BROKEN AGITATOR SHAFT ON THE S-2 MODULE MAS REPLACED  AND  LINED  DURING
                         JUNE.

                         THE S-l MODULE WAS OUT OF SERVICE ON THREE OCCASIONS  DUE  TO PLUGGING OF
                         THE FIRST AND SECOND STAGES.  THE UTILITY REPORTED  THAT WITH  THE  EXCEPTION
                         OF THE PLUGGING PROBLEM ONLY A FEW MINOR SHORT DURATION TRIPS WERE  NOTED.
 7/79
       S-l
       S-2
       SYSTEM
59.2
55.3
57.3
34.1
47.4
40.8
34.1
47.4
40.8
34.1
47.3
40.7
744   743
303  52.7
       «»  PROBLEMS/SOLUTIONS/COMMENTS
                         THE  S-l  MODULE WAS NOT OPERATED DURING THE FIRST PART OF  THE  PERIOD  DUE  TO
                         PLUGGING IN THE FIRST AND SECOND STAGES.   TWO OTHER OUTAGES OCCURRED.
                         ONE  RESULTED FROM A BROKEN SLURRY LINE AND THE OTHER FROM PROCESS CONTROL
                         TROUBLE  ATTRIBUTED TO A MINI COMPUTER MALFUNCTION.

                         THE  S-2  MODULE WAS NOT OPERATED FOR TWO PERIODS.  ONCE WHEN THE TANK WAS
                         BEING REFILLED AFTER AN AGITATOR WAS INSTALLED AND  ONCE TO CLEAN THE FIRST
                         AND  SECOND STAGES.
 8/79
       S-l
       S-2
       SYSTEM
74.6
94.8
84.7
53.8
70.9
62.4
53.8
70.9
62.4
50.7
66.8
58.8
744   701
437  58.6
       **  PROBLEMS/SOLUTIONS/COMMENTS
                         THE  S-l MODULE WAS DOWN FOR TWO PERIODS DUE TO PLUGGING IN THE ABSORBER
                         SECTION.   THE MODULE ALSO TRIPPED OFF AS A RESULT OF SUPERNATE PUMP
                         FAILURES.
 9/79
      S-l
      S-2
      SYSTEM
55.3
87.3
71.3
58.3
60.2
59.3
58.3
78.8
65.7
45.8
47.4
46.6
720   566
336  45.6
                                            13-1131

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SPRINGFIELD CITY UTILITIES: SOUTHWEST 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   X  REMOVAL   PER   BOILER   FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE S-l MODULE WAS OFF  LINE DUE TO  PLUGGING  IN THE  ABSORBER  SECTION FOR
                         TWO PERIODS AND IT ALSO TRIPPED AS  A RESULT  OF SUPERNATE  PUMP
                         FAILURES.

                         THE S-2 MODULE WAS OFF  LINE ONCE DUE TO BROKEN SUPERNATE  LINE, AND ONCE
                         DUE TO FAULTY PH PROBES IN SEPTEMBER.  THE SCRUBBING  SYSTEM  WAS OFF LINE
                         FOR SEVERAL SHORT PERIODS DUE TO MINOR PROBLEMS.
 10/79  SYSTEM         .0

       ** PROBLEMS/SOLUTIONS/COMMENTS
                                                          .0
                                                                              744
                                                                             .0
                         A SCHEDULED BOILER/SCRUBBER OVERHAUL BEGAN ON SEPTEMBER  29 AND  CONTINUED
                         THROUGH OCTOBER  31.

                         BOTH SCRUBBER TOWERS WERE  COMPLETELY CLEANED  DURING THE  OUTAGE.

                         THE SLURRY TANKS AND RELATED  PIPING  WERE  CLEANED  DURING  OCTOBER.

                         THE SCRUBBER OUTLET DUCTWORK  WAS RELINED  WITH PLASITE.

                         ON AREAS OF THE  SCRUBBING  SYSTEM WHERE  FIBERGLASS PIPING MAS  BEING USED,
                         REPLACEMENTS WERE MADE WITH LINED  CARBON  STEEL PIPING.

                         THE PH PROBES WERE REPAIRED.

                         REPAIRS WERE MADE TO THE LIMESTONE FEED BELT  ON THE CONVEYOR  SYSTEM.

                         REPAIRS WERE MADE TO THE S-2  MODULE  HOLD  TANK AGITATOR SHAFT  DURING THE
                         OUTAGE.

                         A PRESATURATOR SPRAY NOZZLE WAS REPLACED.

                         THE SCRUBBER DAMPERS WERE  REPAIRED AND  ADJUSTED.

                         THE SLUDGE DISPOSAL CONVEYOR  SYSTEM  WAS REPAIRED  AND MODIFIED.

                         PUMP REPAIRS WERE MADE ON  THE SUPERNATE PUMPS AND NEW STANDBY PUMPS
                         WERE INSTALLED AT THE SCRUBBING SYSTEM  FACILITY.
 11/79  S-l
        S-2
        SYSTEM
  .0
41.9
20.9
  .0
41.3
20.6
  .0
41.3
20.6
  .0
40.6
20.3
                                                                              720   708
146  58.1
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          FOR  THE  FIRST  WEEK  OF  NOVEMBER  NEITHER  MODULE WAS AVAILABLE DUE TO  AN
                          OVERRUN  ON SCHEDULED OUTAGE  CAUSED  BY A LACK OF MANPOWER.

                          THE  S-l  MODULE WAS  UNAVAILABLE  FOR  THE  LAST THREE WEEKS OF THL MONTH
                          BECAUSE  OF THE LACK OF MANPOWER TO  FINISH THE ABSORBER SECTION AND
                          HOLD TANK  CLEANOUT.

                          PROBLEMS WITH  THE S-2  MODULE RECYCLE PUMPS WERE ENCOUNTERED.  THE MODULE
                          WAS  REMOVED FROM SERVICE SO  THAT THE REPAIRS COULD BE MADE.

                          SEVERAL  ATTEMPTS TO RETURN THE  S-l  MODULE TO SERVICE WERE ABORTED DUE  TO
                          VARIOUS  PIPING PROBLEMS.
 12/79   S-l
53.7
23.7
                                            23.7
                                                        21.2
                                             13-1132

-------
                                                  UTILITY  FGD  SURVEY: OCTOBER  1983  - SEPTEMBER  1984

SPRINGFIELD CITY UTILITIES: SOUTHWEST  1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD    CAP.
                                                                502   PART.  HOURS  HOURS   HOURS  FACTOR
S-2
SYSTEM
64.8
59.3
40.6
32.2
40.6
32.2
36.2
28.7
744
664
213
53.2
       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  S-l  ABSORBER SECTION AND HOLD  TANK  CLEANOUT  MAS COMPLETED DURING
                         DECEMBER.   THE MODULE WAS RETURNED TO SERVICE.

                         THE  PRESATURATION NOZZLES CAUSED SOME PROBLEMS AND HAD  TO  BE REMOVED
                         AND  CLEANED.

                         AT THE END  OF THE MONTH THE ID FAN EXPANSION JOINT BROKE AND HAD  TO BE
                         REPLACED.

                         THE  DENSITY METER ON THE RECYCLE LINE WAS REMOVED AND REPAIRED.

                         THE  DRAINS  ON THE MIST ELIMINATOR  PUMPS HAD  TO BE REPLACED.

                         THE  WEIGH FEEDER WEIGH BELT AND CALIBRATED FEEDER WERE  REPLACED AND
                         THE  CALIBRATION FEEDER WAS CHECKED DURING DECEMBER.

 1/80  S-l         54.5        38.7         47.9        36.3
       S-2         68.7        72.6         73.1        68.1
       SYSTEM      61.6        55.7         60.5        52.2                 744   698     388  65.4

       «*  PROBLEMS/SOLUTIONS/COMMENTS

                         AT THE BEGINNING OF JANUARY AN S-l ID FAN EXPANSION JOINT  FAILED.  THE
                         BOILER WAS  SHUTDOWN SOON AFTER FOR BOILER-RELATED PROBLEMS.

                         DURING THE  LATTER PART OF THIS PERIOD THE S-l MIST ELIMINATOR AND TRAP OUT
                         TRAY HEADER FROZE.  AFTER REPAIRS  WERE  MADE  BOTH MODULES WERE PUT ON  LINE.
                         BOTH WERE KEPT RUNNING UNTIL JANUARY 20 WHEN A FLANGE BROKE LOOSE ON  THE
                         MIST ELIMINATOR HEADER.

                         AFTER MIST  ELIMINATOR REPAIRS WERE COMPLETED THE S-l MODULE OPERATED  UNTIL
                         JANUARY  27  WHEN FREEZING AIR LINES TO THE BALL MILLS PREVENTED THE USE OF
                         BOTH MODULES DUE TO THE LACK OF SLURRY.

                         THE  S-2  MODULE WAS ON LINE AT THE  BEGINNING  OF THE MONTH BUT DEVELOPED
                         PRESATURATOR SPRAY NOZZLE PROBLEMS.  WHILE THIS  WAS BEING  REPAIRED THE
                         UNIT WAS TAKEN OFF LINE.  APART FROM THIS TIME THE MODULE  WAS ON  LINE.

 2/80  S-l         36.7        29.1         31.5        29.1
       S-2         73.8        71.7         73.2        71.6
       SYSTEM      55.3        50.4         52.4        50.4                 696   695     350  59.9

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  S-l  MODULE WAS OUT OF SERVICE  IN THE FIRST PART OF  FEBRUARY DUE TO
                         FROZEN AND  BROKEN LINES.  THE SUPERNATE LINE BROKE IN SEVERAL PLACES  TAKING
                         BOTH MODULES OUT OF SERVICE FOR SEVERAL DAYS. ONCE THIS WAS REPAIRED BOTH
                         MODULES  WERE IN SERVICE AS REQUIRED BY  LOAD  EXCEPT FOR  A FEW MINOR TRIPS.

                         THE  S-2  MODULE WAS EITHER IN SERVICE OR AVAILABLE FOR MOST OF THE MONTH.

 3/80  S-l         64.5        64.1         64.4        64.1
       S-2         22.0        5.8          6.9         5.8
       SYSTEM      43.3        35.0         35.7        35.0                 744   744     260  57.7
                                            13-1133

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER  1984

SPRINGFIELD CITY UTILITIES: SOUTHWEST 1  (CONT.)
-------------------- . ---------------------- PERFORMANCE DATA
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                                                 X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         DURING MARCH THE  S-l  MODULE  WAS OUT FOR 11 DAYS TO CLEAN THE ABSORBER
                         SECTION.

                         THE S-2 MODULE WAS  OUT  OF  SERVICE  FOR  CLEANING THE ABSORBER SECTIONS AND
                         MIST  ELIMINATORS  FOR  NEARLY  ALL THE PERIOD BUT WAS AVAILABLE ON MARCH
                         25.   IT WAS NOT OPERATED,  HOWEVER,  BECAUSE OF LOW UNIT LOAD DEMANDS.
 4/80   S-l
        S-2
        SYSTEM
                   78.2
                   15.1
                   46.7
69.1
 6.9
37.9
37.9
            59.6
             6.0
            32.8
                      720   621
                                   236  42.4
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          THE  S-l  MODULE  EXPERIENCED  SHORT OUTAGES DURING APRIL CAUSED BY SLURRY
                          DRAW-OFF PUMP FAILURES AND  MIST ELIMINATOR AND PRESATURATOR SPRAY  SYSTEM
                          PROBLEMS.

                          THE  S-2  MODULE  EXPERIENCED  RECURRING HIGH FLUE GAS TEMPERATURE-RELATED
                          PROBLEMS DURING THE  MONTH.   THIS WAS CORRECTED BY REPAIRING THE SCRUBBER
                          INLET SCREEN.
  5/80   S-l
        S-2
        SYSTEM
                   72.9
                   43.6
                   58.3
60.7
30.7
45.7
69.1
35.2
52.2
60.6
30.7
45.7
                                                                                           340  56.7
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          DURING MAY THE S-l SCRUBBER REQUIRED CLEANING.

                          PUMP AND PUMP CONTROL PROBLEMS ON THE S-l SCRUBBING TRAIN OCCURRED
                          DURING THE PERIOD.

                          THE S-2 MODULE WAS OFF LINE SEVERAL DAYS BECAUSE OF RECYCLE PUMP AND
                          RECYCLE SYSTEM REPAIRS.

                          FLUE GAS OUTLET DUCT REPAIRS WERE REQUIRED ON THE S-2 MODULE IN MAY.
  6/80  S-l
        S-2
        SYSTEM
                   85.6
                   12.8
                   49.2
85.6
 6.8
45.8
85.5
 7.2
47.4
84.9
 6.8
45.8
                                                                              720   720
330  66.6
        «* PROBLEMS/SOLUTIONS/COMMENTS
                          THE S-l MODULE WAS IN CONTINUOUS SERVICE DURING JUNE WITH SHORT DURATION
                          OUTAGES FOR CLEANING, CONTROL SYSTEM DAMAGE CAUSED BY LIGHTNING, AND OTHER
                          MINOR MISCELLANEOUS PROBLEMS.

                          THE S-2 MODULE WAS OUT OF SERVICE FOR APPROXIMATELY 23 DAYS IN JUNE BECAUSE
                          OF A BROKEN SLURRY HOLD TANK AGITATOR SHAFT.

                          IN ADDITION TO THE OUTAGE CAUSED BY THE BROKEN SHAFT, THE S-2 MODULE HAD
                          SHORT DURATION OUTAGES CAUSED BY RECYCLE PUMP AGITATOR PROBLEMS, CONTROL
                          SYSTEM PROGRAMMING, AND OTHER MINOR MISCELLANEOUS PROBLEMS.
  7/80  S-l
        S-2
        SYSTEM
                   80.5
                   57.0
                   68.7
69.6
39.0
54.3
                                            72.4
            69.5
            39.0
            54.3
                                                                              744
                             743    404  80.6
                                             13-1134

-------
                                                 UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1964

SPRINGFIELD CITY UTILITIES: SOUTHWEST 1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER  BOILER  FGD   CAP.
                                                               S02   PART. HOURS HOURS  HOURS FACTOR


      »* PROBLEMS/SOLUTIONS/COMMENTS

                        DURING JULY THE  S-l MODULE WAS CLEANED AND THE SPHERES WERE REPLACED.

                        THE S-l MODULE DUCTWORK NEEDED REPAIR DURING JULY CAUSING SOME OUTAGE TIME.

                        THE SLUDGE DEWATERING  FILTER  BELT  AND THE HOLD TANK BEARING FAILED
                        ACCOUNTING FOR SOME OF THE S-l MODULE DOWNTIME.

                        THE S-l MODULE SPRAY CONTROL  VALVE FAILED ADDING TO THE OUTAGE TIME.

                        HIGH  FLUE GAS TEMPERATURE CONDITIONS RESULTED IN A  SHUTDOWN OF BOTH THE
                        FGD MODULES.

                        THE S-2 MODULE AGITATOR SHAFT IN THE HOLD TANK FAILED CAUSING THE MODULE
                        TO COME OFF  LINE.

                        PROBLEMS WERE ENCOUNTERED WITH THE SLURRY DRAW OFF  PUMP. SUPERNATANT PUMP
                        AND THE RECYCLE  PUMP CAUSING  THE S-2 MODULE  TO SHUTDOWN.

                        A POWER SUPPLY EQUIPMENT  FAILURE RESULTED IN A S-2  MODULE OUTAGE.

                        AN EXPANSION JOINT FAILURE OCCURRED ON THE S-2 MODULE SEAL AIR FAN.

                        A HIGH  LEVEL CONDITION IN THE DRAW OFF SUMP  WAS ALSO A CAUSE OF THE
                        S-2 MODULE LOW AVAILABILITY.  THE  PROBLEMS EXPERIENCED WITH THE CONTROL
                        SYSTEM CONTRIBUTED ALSO.

 8/80  S-l          73.7       67.4                    67.4
       S-2          71.9       55.4                    55.4
       SYSTEM       72.8       61.4         62.4       61.4                 744   744    457  86.2

       ** PROBLEMS/SOLUTIONS/COMMENTS

                        THICKENER PROBLEMS ENCOUNTERED DURING AUGUST CAUSED BOTH MODULES TO
                        SHUT  DOWN FOR PART OF  THE MONTH.

                        THE OUTLET DUCT  EXPERIENCED  LEAKAGE CAUSING  SOME SYSTEM DOWN TIME.

                        THE S-l MODULE DAMPER  DRIVE  FAILED CAUSED ADDITIONAL OUTAGE TIME.

                        THE  LIMESTONE FEEDER FOR  MODULE  S-2 FAILED CAUSING  THE S-2 MODULE TO
                        SHUT  DOWN FOR PART OF  THE MONTH.

                        THE  FGD SYSTEM WAS SHUT DOWN DURING PART OF  THE MONTH SO THAT VALVE REPAIRS
                        COULD BE MADE.

                        PROBLEMS WERE ENCOUNTERED WITH THE S-2 MODULE RECYCLE PUMP.

 9/80  S-l          78.5       85.8         87.4        78.5
       S-2          57.5          .6           .2          .2
       SYSTEM       68.0       43.2         43.8        39.4                 720   658    283  80.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                        DURING  SEPTEMBER,  THE  SCRUBBER OUTLET DUCTS  EXPERIENCED  LEAKING CAUSING
                        THE SYSTEM TO SHUTDOWN FOR  PART  OF THE MONTH.

                        THE S-l MODULE EXPERIENCED  INLET DAMPER  PROBLEMS.

                        THE RECYCLE  SPRAY  NOZZLES ON THE S-2 MODULE  PLUGGED CAUSING ADDITIONAL
                        OUTAGE TIME.
                                            13-1135

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER  1984

SPRINGFIELD CITY UTILITIES: SOUTHWEST  1  (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR

                         THE RADIAN  CORP. BEGAN PREPARING THE SYSTEM FOR TESTING IN THE FORCED
                         OXIDATION MODE.  THIS IS IN CONJUNCTION WITH THE AOIPIC ACID TEST PROGRAM.

10/80  5-1
       S-2
       SYSTEM         .0           .0           .0          .0                  744   572      0  67.3

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         BOTH  SCRUBBER  MODULES WERE OUT OF SERVICE FOR THE ENTIRE PERIOD DUE TO
                         MAINTENANCE REQUIREMENTS THAT COULD NO LONGER BE DEFERRED.

                         THE BOILER  WAS BROUGHT OFF LINE ON OCTOBER 2* FOR AN ANNUAL MAINTENANCE
                         OUTAGE.  THIS  OUTAGE HAD BEEN DELAYED FOR APPROXIMATELY ONE MONTH BECAUSE
                         OF SYSTEM ELECTRICAL DEMAND AND THE UNAVAILABILITY OF ALTERNATE POU'ER
                         PRODUCTION  FACILITIES.

 11/80  S-l
       S-2
       SYSTEM         .0           .0           .0          .0                  720   147      0  11.9

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SCRUBBER MODULES WERE NOT RETURNED TO SERVICE AT THE CONCLUSION OF THE
                         ANNUAL MAINTENANCE OUTAGE DURING NOVEMBER.  WORK WAS IN PROGRESS TO
                         PREPARE THE MODULES FOR TESTING IN THE FORCED OXIDATION MODE OF OPERATION
                         IN CONJUNCTION WITH THE EPA ADIPIC ACID TEST PROGRAM.

 12/80  S-l          37.4           .0           .0          .0
       S-2          48.4         12.5         16.9         8.7
       SYSTEM       42.9          6.3          7.7         4.4                  744   520     65  49.3

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING DECEMBER, DOWN TIME RESULTED DUE TO PIPING SYSTEM MODIFICATIONS,
                         AN INLET DAMPER DRIVE FAILURE, FROZEN AND BROKEN PIPING, AND PROGRAMMABLE
                         CONTROLLER  PROBLEMS.

  1/81  S-l          41.9         41.2                     41.1
       S-2          73.1         66.3                     66.1
       SYSTEM       57.5         53.7         71.4        53.6                  744   742    399  67.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY MODULES S-l AND S-2 ENCOUNTERED ELECTRICAL PROBLEMS IN THE
                         DEUATERING  AREA AND PROGRAMMABLE CONTROLLER MALFUNCTIONS.

                         THE  RECYCLE SPRAY  NOZZLES ON THE S-l MODULE PLUGGED CAUSING SOME OUTAGE
                         TIME.

                         ADDITIONAL  FGD SYSTEM PROBLEMS DURING THE MONTH INCLUDED SLURRY MAKE-UP
                          LINE  PLUGGING, A BROKEN SUPERNATANT LINE, AND AN I.D. FAN EXPANSION JOINT
                          FAILURE.

  2/81  S-l          55.3         53.6         54.4        53.0
       S-2          36.9         32.7         37.1        32.3
       SYSTEM       46.1         43.1         45.8        42.6                  672   664    287  71.8

       *»  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY MODULE S-l WAS OFF LINE PART OF THE MONTH DUE  TO FAILURE
                         OF  THE EXPANSION JOINT IN THE RECYCLE PUMP DISCHARGE LINE.

                         MODULE S-2  EXPERIENCED PROBLEMS DUE TO PLUGGING IN THE BALL CAGE,  PRESATU-
                                             13-1136

-------
                                                  UTILITY FGD SURVEY:  OCTOBER  1983 -  SEPTEMBER  1984

SPRINGFIELD CITY UTILITIES:  SOUTHWEST 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY  OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD    CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR

                         RATOR AREA,  AND THE RECYCLE NOZZLE.

 3/81 SYSTEM                                                                 7tA

      ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION FOR THE MONTH OF MARCH IS NOT AVAILABLE AT  THIS TIME.

 4/81 S-l         47.5        62.1        64.8        46.3
      S-2         73.5        97.2        97.2        72.4
      SYSTEM       60.5        79.6        81.3        59.3                  720   536   427  59.4

      »* PROBLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL A SUPERNATANT PIPE FAILURE CAUSED SOME OUTAGE TIME FOR  BOTH
                         MODULES.

                         A  BOILER TRIP ON APRIL 23 CAUSED A HIGH TEMPERATURE CONDITION ON BOTH
                         MODULES.  THE MODULES WERE INSPECTED AMD S-2 WAS RETURNED TO SERVICE AND
                         S-l REMAINED OFF LINE DUE TO DAMAGE TO THE SCRUBBER SPHERES.

                         SOME DOWN TIME RESULTED DUE TO PROGRAMMABLE CONTROLLER  PROBLEMS.  THE S-l
                         MODULE'S INTERNALS WERE INSPECTED BY RADIAN CORP.

                         MODULE S-2 TRIPPED DUE TO AN EQUIPMENT FAILURE WHILE SWITCHING  RECYCLE
                         PUMPS AND WENT OFF LINE TWICE DUE TO THE LOSS OF ELECTRICAL POWER  IN THE
                         DEWATERING AND SUPERNATANT PUMPS AREA.

 5/81  S-l         44.9        86.9        99.3        36.6
       S-2         42.6        61.3        82.1        25.8
       SYSTEM       43.7        74.3        91.4        31.2                  744   313    232  27.2

       »» PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MAY THE BOILER REMAINED OUT OF SERVICE THROUGH MAY 18, FOR  A
                         SCHEDULED MAINTENANCE OUTAGE.

                         MODULE S-l WAS OUT OF SERVICE APPROXIMATELY 410 HOURS DUE TO PROGRAMMABLE
                         CONTROLLER POWER PROBLEMS.

                         MODULE S-2 EXPERIENCED 427 HOURS OF OUTAGE TIME DUE TO DEWATERING  PROBLEMS.

 6/81  S-l         76.3        77.9        82.3        62.6
       S-2         79.2        72.9        84.9        58.5
       SYSTEM       77.8        75.4        83.5        60.6                  720   579   436  58.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JUNE THE SYSTEM WAS DOWN PART OF THE TIME DUE TO LIMESTONE  CONVEYOR
                         PROBLEMS.

                         THE UNIT WAS OUT OF SERVICE FOR ABOUT SIX DAYS IN JUNE FOR MAINTENANCE.

                         BOTH MODULES EXPERIENCED OUTAGES DUE TO ELECTRICAL PROBLEMS CAUSED BY
                         LIGHTNING.

 7/81 S-l         94.9        90.9        98.1        90.9
      S-2         98.3        94.5        94.5        94.5
      SYSTEM       96.6        92.7        96.3        92.7                  744   744    690  78.1
                                            13-1137

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SPRINGFIELD CITY UTILITIES: SOUTHWEST 1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS  FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE ONLY SIGNIFICANT  FGD  SYSTEM OUTAGE DURING JULY WAS NECESSARY FOR MOD-
                         IFICATION OF THE  S-l  TRAYS.  BOTH MODULES WERE REMOVED FROM SERVICE  TO
                         PERMIT  ENTRY INTO THE MODULE.

                         MINOR PUMP AND  PIPING PROBLEMS  WERE  ENCOUNTERED DURING THE MONTH.
 8/81
S-l
S-2
SYSTEM
100.0
 96.2
 98.1
100.0
 74.7
 87.4
100.0
 80.5
 90.3
100.0
 74.7
 87.4
                                                                              744   744
                                                                                           650  82.3
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          DURING  THE  MONTH,  ONE  OF  THE  CONVEYOR BELTS USED FOR SLUDGE REMOVAL  WAS
                          STRUCK  BY A TRUCK  AND  DAMAGED.   SOME MINOR PROBLEMS RESULTED.
  9/81   S-l
        S-2
        SYSTEM
            89.4
            87.6
            88.5
             79.9
             75.6
             77.8
             88.6
             81.1
             84.9
             79.9
             75.6
             75.6
                       720   720
                                                                                           544  67.4
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE SLUDGE  CONVEYOR  REMAINED  OUT OF SERVICE DURING THE MONTH AS A RESULT
                          OF  DAMAGE FROM A TRUCK ACCIDENT. THIS CAUSED THE MAJORITY OF THE FGD  SYSTEM
                          OUTAGE TIME DURING THE MONTH.

                          SLURRY CARRYOVER IN THE RECYCLED SUPERNATANT WATER CAUSED NOZZLE PLUGGING
                          AND OUTAGE  TIME ON BOTH MODULES DURING THE MONTH.
 10/81  S-l
        S-2
        SYSTEM
            50.9
            43.0
            47.0
             95.5
             78.0
             86.8
             99.4
             96.7
             98.1
             49.3
             40.2
             44.8
                                                                              744   384
                                    333  32.8
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          ON OCTOBER 16 A UNIT MAINTENANCE OUTAGE OCCURRED AND LASTED THROUGH THE END
                          OF THE MONTH.

                          DURING THE OUTAGE THE MOBILE SPHERES WERE REMOVED FROM S-2 AND REPLACED
                          WITH TRAYS SIMILAR TO THOSE PREVIOUSLY INSTALLED IN S-l.
 11/81  SYSTEM
                      .0
                                                          .0
                                                                              720
                                                                                                  .0
        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE UNIT MAINTENANCE OUTAGE LASTED THROUGH NOVEMBER.
 12/81  S-l
        S-2
        SYSTEM
            80.5
            76.2
            78.4
             82.6
             82.2
             82.3
             97.8
             93.3
             95.5
             65.9
             65.7
             65.8
                                                                              744   594
                                                                                           489  49.2
        *» PROBLEMS/SOLUTIONS/COMMENTS
                          THE UNIT MAINTENANCE OUTAGE ENDED DECEMBER 7 WITH THE BOILER FIRED WITH
                          FUEL OIL AND NATURAL GAS ON DECEMBER 6.  A SHORT OUTAGE FOR CONDENSER TUBE
                          LEAK REPAIR OCCURRED ON DECEMBER 30.

                          THE MODULE OUTAGES OCCURRED DURING THE PERIOD FOR THE FOLLOWING REASONS:
                          HIGH TEMPERATURE TRIPS, LOSS OF D.C. POWER, RECYCLE PUMP PROBLEMS, AND
                          FLUE GAS DAMPER PROBLEMS.
  1/82   S-l
                    98.6
                                98.2
                                            98.2
                                                        97.9
                                             13-1138

-------
                                                  UTILITY FGD SURVEY:  OCTOBER  1983  - SEPTEMBER

SPRINGFIELD CITY UTILITIESi SOUTHWEST  1  (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD    CAP.
                                                                S02   PART.  HOURS  HOURS   HOURS  FACTOR
S-2
SYSTEM
88.6
93.6
88.5
93.4
99.0
98.6
88.2
93.0
744
742
692
71.1
       **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY MODULE S-2 WAS REMOVED  FROM SERVICE  FOR  MAINTENANCE APPROX-
                         MATELY THREE DAYS DURING A LOW LOAD PERIOD.

 2/82  S-l         42.2         43.8        99.8        42.2
       S-2         84.2         83.3        99.7        80.2
       SYSTEM      63.2         63.6        99.8        61.2                  672   647    411  43.9

       »*  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY BOTH MODULES WERE OUT  OF SERVICE  PART OF  THE  TIME FOR
                         INTERNAL CLEANING AND GENERAL MAINTENANCE.  THIS  WORK WAS PERFORMED DURING
                         LOW LOAD PERIODS, PERMITTING SINGLE MODULE OPERATION.

 3/82  S-l         66.3         98.5        98.5        66.3
       S-2           .0           .0                      .0
       SYSTEM      33.2         49.2        98.5        33.2                  744   501    247  28.5

       »*  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH MODULE S-2 REMAINED OUT OF SERVICE FOR MAINTENANCE.  LOW
                         LOADS WERE EXPERIENCED PERMITTING SUCCESSFUL SINGLE MODULE OPERATION WITH
                         S-l.

                         THE UNIT MAINTENANCE OUTAGE BEGAN ON MARCH 22.

 4/82  S-l           .0                                   .0
       S-2           .0                                   .0
       SYSTEM        .0                                   .0                  720     0     0     .0

       «*  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL THE UNIT AND THE FGD SYSTEM WERE OFF-LINE  FOR A SCHEDULED
                         MAINTENANCE OUTAGE.

 5/82  S-l         60.6         80.3        95.4        55.8
       S-2         58.8         51.2        97.9        35.6
       SYSTEM      59.7         65.7        96.6        45.7                  744   517    340   39.1

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT OUTAGE STARTED IN APRIL EXTENDED INTO MAY, DURING WHICH SOME  MAJOR
                         REPAIRS WERE ACCOMPLISHED ON THE FGD SYSTEM MODULES.  THE REMAINDER  OF  THE
                         MONTH INCLUDED SEVERAL PERIODS OF LOW UNIT LOAD REQUIRING THE OPERATION OF
                         ONLY ONE MODULE.  ADDITIONAL SYSTEM MAINTENANCE WAS ACCOMPLISHED AT  THESE
                         TIMES.

 6/82  A           82.4         41.6        98.2        40.8
       B           96.2         98.0        97.6        85.0
       SYSTEM      89.3         69.8        97.9        62.9                  720   706    453  52.6

       »*  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JUNE, LOW UNIT LOADS WERE EXPERIENCED DURING MUCH OF THE MONTH,
                         REQUIRING ONLY ONE MODULE TO BE IN SERVICE.  ROUTINE CLEANING AND MAINTEN-
                         ANCE WAS ACCOMPLISHED AS REQUIRED.

 7/82  S-l         83.9         76.3        96.9        64.1
       S-2         83.8         85.9        98.9        72.2
       SYSTEM      83 8         81.1        97.9        68.1                  744   625    507  54.5
                                            13-1139

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER  1984

SPRINGFIELD CITY UTILITIES: SOUTHWEST 1  (CONT. )
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION
                                              X REMOVAL   PER  BOILER  FGD   CAP.
                                              S02  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         A UNIT OUTAGE  OCCURRED  DURING THE  PERIOD OF JULY 1 THROUGH 6 DUE TO THE
                         REPAIR OF A CONDENSER  LEAK.   THIS  PERIOD WAS CONSIDERED AS UNAVAILABLE TIME
                         FOR THE FGD MODULES  AS  MINOR  MAINTENANCE WAS PERFORMED WHILE THE UNIT WAS
                         OFF LINE.

                         ALL OTHER FGD  SYSTEM OUTAGES  DURING JULY OCCURRED AT LOW LOAD PERIODS WITH
                         ONLY ONE MODULE  REQUIRED  TO OPERATE.
 8/82
       S-l
       S-2
       SYSTEM
 88.0
 93.0
 90.5
86.1
81.8
83.9
95.7
97.8
96.7
78.4
80.4
                                  744   713
                                                                                           598  66.5
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         THE  FGD SYSTEM  OUTAGES  FOR  AUGUST OCCURRED PRIMARILY DURING PERIODS OF LOW
                         UNIT LOAD REQUIRING  ONLY  SINGLE  MODULE OPERATION AND DURING START-UP
                         PERIODS FOLLOWING  UNIT  TRIPS.  TWO INSTANCES OF SHORT DURATION OCCURRED
                         WHEN BOTH MODULES  WERE  TAKEN OUT OF SERVICE TO PERMIT ACCESS INTO THE
                         MODULE REQUIRING MAINTENANCE.
  9/82
        S-l
        S-2
        SYSTEM
 99.8
100.0
 99.9
69.5
79.0
74.2
80.9
91.2
86.0
69.5
79.0
74.2
                                                                              720   720
                                                                                           534  65.2
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE  FGD  MODULES WERE  REMOVED  FROM SERVICE AT VARIOUS TIMES DURING SEPTEMBER
                          DUE  IN PART TO LOW UNIT LOADS.

                          INSTALLATION OF NEW LIMESTONE CLASSIFIER SYSTEMS ALSO CONTRIBUTED TO  THE
                          MODULE OUTAGE TIME DURING SEPTEMBER.

                          ALTHOUGH SOME MAINTENANCE WAS ACCOMPLISHED ON THE MODULES, THEY WERE
                          CONSIDERED  AVAILABLE  DURING THE OUTAGE PERIODS.
 10/82  S-l
        S-2
        SYSTEM
 89.2
 96.4
 92.8
87.7
89.6
88.7
98.6
93.7
96.1
87.8
89.8
88.8
                                                                              744   744    661  68.1

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          TWO INSTANCES OF PLUGGING OCCURRED IN THE S-l MODULE DURING OCTOBER.

                          THE S-2 MODULE REQUIRED A BRIEF OUTAGE PERIOD IN OCTOBER FOR CLEANING.
 11/82  S-l
        S-2
        SYSTEM
 97.4
 96.7
 97.1
93.1
95.0
94.0
96.9
98.3
97.6
93.1
95.0
94.0
                                                                              720   720
                                                                                           677  68.4
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE  UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                          DURING NOVEMBER.
 12/82   S-l
        S-2
        SYSTEM
  7.6
  8.4
  8.0
83.7
91.9
87.8
92.1
93.4
92.7
 6.6
 7.2
 6.9
                                                                              744
                                                                                     58
51   4.8
                                             13-1140

-------
1/83


2/83


3/83


S-l
S-2
SYSTEM
S-l
S-2
SYSTEM
S-l
S-2
SYSTEM
.0
.0
.0
.0
.0
.0
.0
.0
.0
                                                  UTILITY FGD  SURVEY:  OCTOBER  1983 -  SEPTEMBER  1984

SPRINGFIELD CITY UTILITIES: SOUTHWEST  1  (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD    CAP.
                                                                S02   PART.  HOURS HOURS   HOURS  FACTOR


      **  PROBLEMS/SOLUTIONS/COMMENTS

                         A UNIT TRIP OCCURRED ON DECEMBER 2 WHEN LIGHTNING  INTERRUPTED THE  ELECTRI-
                         CAL SYSTEM INTERTIE.  THIS RESULTED IN A UNIT FORCED  OUTAGE  OF
                         APPROXIMATELY ft HOURS.

                         THE UNIT WAS REMOVED FROM SERVICE ON DECEMBER 3, 1982 FOR  AN EXTENSIVE
                         MAINTENANCE OUTAGE.   START-UP IS ANTICIPATED FOR MAY, 1983.

                                                         .0
                                                         .0
                                                         .0                 744     0      0     .0

                                                         .0
                                                         .0
                                                         .0                 672     0      0     .0

                                                         .0
                                                         .0
                                                         .0                 744     0      0     .0

       »*  PROBLEMS/SOLUTIONS/COMMENTS

                         THE DECEMBER 1982 -  MAY 1983 MAINTENANCE OUTAGE CONTINUED  THROUGHOUT  THE
                         MONTH OF MARCH.

 4/83  SYSTEM                                                               720     0            .0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         A  UNIT MAINTENANCE OUTAGE TOOK PLACE DURING THE ENTIRE  MONTH OF APRIL.

 5/83  S-l         41.4        71.9        92.1        22.3
       S-2         40.4        40.8        87.3        12.7
       SYSTEM      40.9        56.4        89.7        17.5                 744   231     130   13.7

       «*  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT MAINTENANCE OUTAGE WHICH BEGAN IN APRIL,  ENDED ON MAY  19, 1983.

 6/83  S-l         94.1        56.8        97.6        51.9
       S-2         99.8        60.8        82.5        55.6
       SYSTEM      96.9        58.8        90.0        53.7                  720   657    387  39.7

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGO-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING JUNE.

 7/83  S-l         98.6        95.2        99.2        89.7
       S-2         98.8        68.6        98.8        64.7
       SYSTEM      98.7        81.9        99.0        77.2                  744   701    574  63.2

       «*  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING JULY.

 8/83  S-l         90.8        84.0        99.2        65.3
       S-2         93.5        95.5        97.9        74.2
       SYSTEM      92.2        89.7        98.5        69.8                  744   578    519  56.7

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER  198*

SPRINGFIELD CITY UTILITIES: SOUTHWEST 1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD  CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY  REPORTED  THAT LOW BOILER AVAILABILITY DURING AUGUST WAS DUE TO
                         WATER WALL TUBE  LEAKS.
  9/83  S-l
       S-2
       SYSTEM
           100.0
           100.0
           100.0
            82.7
            96.5
            89.6
            99.7
            99.8
            99.8
             82.7
             96.5
             89.6
                                                          720   720
                                                                                   645  59.7
       **  PROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY  REPORTED  THAT NO MAJOR  FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING SEPTEMBER.
 10/83
S-l
S-2
SYSTEM
22.3
22.3
22.3
98.6
94.6
96.6
 99.4
100.0
 99.7
22.0
21.1
21.5
                                                                              744   166
                                                                                           160  13.6
        **  PROSLEMS/SOLUTIONS/COMMENTS
                          A  SCHEDULED  UNIT OUTAGE  OCCURRED DURING OCTOBER TO REPLACE SECTIONS OF
                          BOILER  WATER WALL TUBING.

                          ABSORBER  TRAY REPAIRS AND  ALTERATIONS WERE MADE DURING THE UNIT OUTAGE IN
                          OCTOBER.
 11/83   S-l
        S-2
        SYSTEM
           100.0
           100.0
           100.0
            40.6
            74.0
            57.3
            99.6
            99.6
            99.6
              5.6
             10.3
              8.0
                                                                              720   100
                                                                                            57   6.3
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          THE  BOILER  WAS OUT OF SERVICE FOR SEVERAL EXTENDED PERIODS DURING NOVEMBER
                          DUE  TO  WATER  WALL TUBE FAILURES AND SUBSEQUENT REPAIRS.
 12/83  S-l
        S-2
        SYSTEM
            71.2
            98.0
            84.6
            10.8
            95.3
            53.1
            89.7
            95.3
            92.5
              5.0
             43.9
             24.4
                                                                              744   342
                                   182  20.8
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          MODULE  S-l WAS OUT OF SERVICE APPROXIMATELY 9 DAYS DURING DECEMBER DUE TO
                          FROZEN  LINES AND VALVES.
1/84


2/84


S-l
S-2
SYSTEM
S-l
S-2
SYSTEM
99.8
99.1
99.4
100.0
99.5
99.8
99.0
96.7
97.9
100.0
89.7
94.9
99.7
98.8
99.3
100.0
99.5
99.7
90.8
88.7
89.7
100.0
89.7
94.9
                                                                              744   682
                                                                              696   696
                                                                                           668  68.3
                                                                                           660  68.5
        #* PROBLEMS/SOLUTIONS/COMMENTS
                          NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED DURING JANUARY AMD FEBRUARY.
  3/84   S-l
        S-2
        SYSTEM
            98.0
            93.1
            95.6
            77.5
            51.2
            64.4
            96.6
            98.2
            97.4
             59.5
             39.3
             49.4
                                                                              744   571
                                   368  49.1
                                             13-1142

-------
                                                  UTILITY  FGD  SURVEY:  OCTOBER  1983 -  SEPTEMBER

SPRINGFIELD CITY UTILITIES: SOUTHWEST  1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD    CAP.
                                                                S02   PART.  HOURS HOURS  HOURS  FACTOR


      *»  PROBLEMS/SOLUTIONS/COMMENTS

                         HIGH  BACK PRESSURE ON MODULE  S-l WAS REPORTED AND  DISCOVERED  TO BE CAUSED
                         BY  A  BROKEN LINKAGE ON A DAMPER BLADE.

                         THE REPAIR OF  A SEAL WATER LINE CONTRIBUTED  TO FGD-SYSTEM OUTAGE TIME
                         DURING MARCH.

                         A SLURRY RECYCLE LINE LEAK ON MODULE S-2 WAS TEMPORARILY REPAIRED DURING
                         MARCH.

 4/84 S-l         64.7        75.1        97.3        50.0
      S-2         66.0        43.1        99.2        28.7
      SYSTEM       65.4        59.1        98.3        39.4                  720   480    284   45.0

      »»  PR03LEMS/SOLUTIONS/COMMENTS

                         VIBRATION PROBLEMS WERE REPORTED ON THE "A"  ID FAN. THE FAN WHEEL WAS
                         CLEANED AND RETURNED TO SERVICE.

 5/84 S-l          7.7          .0                      .0
      S-2          7.7        87.6        93.5         7.2
      SYSTEM        7.7        43.8        93.5         3.6                  744    61    27   40.7

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         A  PLANNED UNIT OUTAGE OCCURRED DURING APRIL  AND MAY TO  REPLACE  WATERWALL
                         TUBES.

 6/84 S-l         99.5        65.9        97.1        60.9
      S-2         98.9        89.4        99.1        82.7
      SYSTEM       99.2        77.7        98.1        71.8                  720   665    517   61.9

      «*  PROBLEMS/SOLUTIONS/COMMENTS

                         MINOR PLUGGING IN THE ABSORBER BOTTOM TRAY AREA WAS REPORTED. HIGH EXCESS
                         OXYGEN REQUIREMENTS AND PH ADJUSTMENTS AT LOW LOADS WERE BELIEVED TO  BE THE
                         CAUSE.

                         CONDENSATE PUMP PROBLEMS DURING JUNE CONTRIBUTED TO FGD SYSTEM  DOWN TIME.

 7/84 S-l        100.0        72.5        98.2        72.2
      S-2         98.9        92.6        98.9        92.3
      SYSTEM       99.4        82.5        98.6        82.3                  744   742    612   67.0

      #*  PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED  DURING JULY.

 8/84 S-l         99.6        83.1        98.2        83.1
      S-2         98.4        78.9        96.8        78.9
      SYSTEM       99.0        81.0        97.5        81.0                  744   744    603  72.7

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE PERIOD OF AUGUST 26 TO AUGUST 28i THE PROCESS CONTROLLER POWER
                         SUPPLY FAILED CAUSING AN AUTOMATIC SHUT DOWN.

                         DURING AUGUST, THE SUPERNATE LINE TO THE ABSORBER BROKE AT AN ELBOW AND WAS
                         LATER REPLACED.

 9/84 SYSTEM                                                                 72°
                                            13-1143

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

SPRINGFIELD CITY UTILITIES: SOUTHWEST 1 (CONT.)
	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR SEPTEMBER

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
                                           SECTION 13
              DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION  LIMITATION - NG/J
NOX EMISSION  LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT  GENERATING CAPACITY W/FGO - MW
NET UNIT  GENERATING CAPACITY MO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT  DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 *» FUEL  DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE  HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE  ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE  MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE  SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE  CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE  CONTROL

 ** MECHANICAL COLLECTOR
     NUMBER
     TYPE

 »* FABRIC  FILTER
     NUMBER
     TYPE

 »* ESP
     NUMBER
     NUMBER OF SPARES
     TYPE
     SUPPLIER
     INLET  FLUE GAS CAPACITY - CU.M/S
     INLET  FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE  SCRUBBER
     NUMBER
     GENERIC  TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
SPRINGFIELD WATER, LIGHT i PWR
DALLMAN
3
SPRINGFIELD
ILLINOIS
D
 .100 LB/MMBTU)
1.200 LB/MMBTU)
 .700 LB/MMBTU)
  516.
  301.
  350
  205
  192
  202
  205
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
  401.11       ( 850000 ACFM)
  137.8        ( 280 F)
  152.         ( 500 FT)
CONCRETE
»****»»        (***** FT)
COAL 1 [50X1
BITUMINOUS; BITUMINOUS
26444.         ( 11369 BTU/LB)
                NR; 10500-11500
   10.65
NR; 8.0-14.0
   11.75
6.9-10.3! 13.6-17.5
    3.05
NR; 2.5-4.0
     .10
NR; .07-.16
 0
NONE
 0
NONE
 1
 0
COLD SIDE
AIR CORRECTION DIVISION, UOP
  413.9        ( 877127 ACFM)
  161.7        (  323 F)
     .5        (  2. IN-H20)
   99.5
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
                                            13-1145

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SPRINGFIELD WATER, LIGHT i PWR: DALLMAN 3 (CONT.)
»** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     SOS REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY - 7.
     UNIT DESIGN SOS REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 *« DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X
     DESIGN COAL HEAT CONTENT - J/G
     DESIGN COAL ASH CONTENT - X
     DESIGN MOISTURE CONTENT - X
     DESIGN CHLORIDE CONTENT - X
     OPER. £ MAINT. REQUIREMENT - MANHR/DAY

 *# CUENCHER/PRESATURATOR
     NUMBER
     TYPE
     SUPPLIER
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     LIQUID RECIRCULATION RATE - LITERS/S
     L/G RATIO - L/CU. M
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 *« ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS  - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     DISTANCE BETWEEN GAS CONTACTING ZONES - CM
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUFERFICAL  GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X
     PARTICLE REMOVAL EFFICENCY - X
THROWAWAY PRODUCT
WET SCRUBBING
LIMESTONE
NONE
RESEARCH-COTTRELL
BURNS & MCDONNELL
FULL SCALE
NEW
   99.50
   95.00
    4.9
 1
 1/81
10/80
12/77
    3.30
25586.0
   10.40
   15.90
     .07
   64.0
QUENCHER
RESEARCH-COTTRELL
  #* MIST ELIMINATOR
      PRE-MIST ELIMINATOR/MIST ELIMINATOR
      NUMBER  PER  SYSTEM
      NUMBER  OF SPARES  PER  SYSTEM
      NUMBER  PER  MODULE
              (  11000 BTU/LB)
  215.19
  137.8
     .2
  416.
  '  1.9
HIGH ALLOY
IRON BASE/NICKEL-CHROMIUM-COPPER-MOLYBDENUM
              (  456000 ACFM)
              (   280 F)
              (  1.0 IN-H20)
              (  6600 GPM)
              (  14.5 GAL/1000 ACFM)
 2
 0
COMBINATION TOWER
SPRAY/PACKED
SPRAY/FIXED BED PACKING
RESEARCH-COTTRELL
30.0 DIA X 92.5
STAINLESS STEEL
AUSTENITIC
TYPE 316L
NONE
N/A
N/A
VERTICAL CROSS CHANNEL FIXED GRID PACKING
 2
               (   24.0IN)
               (25400 GPM)
               ( 55.7 GAL/1000 ACF)
               (   .7 IN-H20)
               (   9.1 FT/S)
               ( 456000 ACFM)
               (   280 F)
  61.0
1600.
   7.4
    .2
   2.8
 215.19
 137.8
  95.0
    .0
 PRIMARY COLLECTOR
 2
 0
 1
                                             13-1146

-------
                                                  UTILITY F6D SURVEY:  OCTOBER 1983 - SEPTEMBER 198*
SPRINGFIELD WATER,  LIGHT  «  PWR:  DALLMAN 3 (CONT.)
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON  TYPE
     MANUFACTURER
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER  STAGE
     FREEBOARD DISTANCE -  M
     DISTANCE BETWEEN STAGES - CM
     DISTANCE BETWEEN VANES  - CM
     VANE ANGLES -  DEGREES
     PRESSURE DROP  - KPA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     MASH MATER SOURCE
     MASH FREQUENCY
     MASH RATE - L/S

 »* REHEATER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON  TYPE
     PERCENT GAS BYPASSED  -  AVG
     TEMPERATURE INCREASE  -  C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 «* FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW  RATE -  CU.M/S
     FLUE GAS TEMPERATURE  -  C
     PRESSURE DROP  - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE

 »» FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW  RATE -  CU.M/S
     FLUE GAS TEMPERATURE  -  C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     MODULATION
     SEAL AIR FLOW  - CU. M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC  MATERIAL  TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
               (  6.0 FT)
               (36.0 IN)
               (  1.00 IN)
                  .5 IN-H20)
                  9.0 FT/S)
IMPINGEMENT
BAFFLE
CLOSED VANE
RESEARCH-COTTRELL
HORIZONTAL
    2
    2
    1.83
   91.44
    2.5
  30
     .1
    2.7
ORGANIC
POLYPROPYLENE
FRESH
EVERY 8 HRS IUPPER], 15 MIN I LOWER 1
   14.5        (   230 GAL/MIN)
 1
 0
BYPASS
COLD SIDE
N/A
   10.0
   27.8
NR
NR
                   50 F)
 2
 0
CENTRIFUGAL
AMERICAN STANDARD
BOOSTER
FORCED DRAFT
DRY
  217.07       (
  137.8        (
    1.2        (
CARBON STEEL
 2
 0
CENTRIFUGAL
WESTINGHOUSE
UNIT
FORCED DRAFT
DRY
  217.07
  137.8
CARSON STEEL
                 460000 ACFM)
                  280 F)
                 4.0 IN-H20)
               ( 460000 ACFM)
               (  280 F)
 2
CONTROL
LOUVER
N/A
AMERICAN STANDARD
OPEN
     .00       (      0 ACFM)
CARBON STEEL
AISI 1110
ORGANIC
INERT FLAKE-FILLED VINYL ESTER
SHUT-OFF
                                            13-1147

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
SPRINGFIELD WATER, LIGHT t PWR: DALLMAN 3 (CONT.)
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     MODULATION
     SEAL AIR FLOW - CU. M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     MODULATION
     SEAL AIR FLOW - CU. M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION'
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTU'^K
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 «* DUCTWORK
     LOCATION
     CONFIGURATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER
     NUMBER OF SPARES
     FULL  LOAD DRY FEED CAPACITY - M.TONS/HR
     PRC3UCT QUALITY -  X SOLIDS
GUILLOTINE
NR
AND CO
OPEN
     .00       (      0 ACFM)
CARBON STEEL
AISI 1110
ORGANIC
INERT FLAKE-FILLED VINYL ESTER
SHUT-OFF
GUILLOTINE
NR
ANDCO
HIGH ALLOY I WROUGHT]
IRON BASE/NICKEL-CHROMIUM-COPPER-MOLYBDENUfl
NONE
N/A
SHUT-OFF
LOUVER
N/A
MOSSER
OPEN
     .00       (      0 ACFM)
CARBON STEEL
AISI 1110
NONE
N/A
ABSORBER OUTLET
RECTANGULAR
100.0 X 13.5 X 13.5
HIGH ALLOY
IRON BASE/CHROMIUM-MOLYBDENUM-NICKEL-COPPER
ORGANIC
FIBER-REINFORCED POLYESTER
ABSORBER INLET
RECTANGULAR
30.0 X 9.5 X 11.0
CARBON STEEL
AISI 1110
NR
NR
BYPASS
RECTANGULAR
CARBON STEEL
AISI 1110
NR
NR
WET BALL MILL
COMPARTMENTED
TUBE MILL
KENNEDY VAN SAUN
  121.6
   35.0
TPH)

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
SPRINGFIELD WATER,  LIGHT  t  PWR:  DALLMAN 3 (CONT. )
 ** REAGENT PREPARATION  EQUIPMENT
     FUNCTION
     DEVICE
     MANUFACTURER
     NUMBER
     NUMBER OF SPARES

 »* REAGENT PREPARATION  EQUIPMENT
     FUNCTION
     DEVICE
     MANUFACTURER
     NUMBER

 «» TANKS
     SERVICE
     QUENCHER  FEED
     ABSCPBER  FEED
     REAGENT PREP PRODUCT
     MIST ELIMINATOR  WASH
     VACUUM FILTER  FILTRATE
     HASTE SLURRY BLEED
     MILL SLURRY  SUMP

 ** PUMPS
     SERVICE
     ABSORBER  FEED
     QUENCHER
     DEMISTER  WASH
     SUMP
     MILL SLURRY
     VACUUM FILTER
     FILTRATE
     HYDROCLONE FEED
     REAGENT FEED

 »* SOLIDS CCNCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     DIMENSIONS - FT
     CAPACITY
     SHELL GENERIC  MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     BELT GENERIC MATERIAL TYPE
     BELT SPECIFIC  MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM  CHARACTERISTICS
     OVERFLOW  STREAM  CHARACTERISTICS

 *» SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUKSER
     NUMBER OF SPARES
     DIMENSIONS - FT
     SHELL GENERIC  MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC  MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

»** SALEABLE BYPRODUCTS
     NATURE

*** SLUDGE
GRIT REMOVAL IBALL MILL/REAGENT FEED TANK]
HYDROCYCLONE
KREBS
CLASSIFICATION IABSORBER FEED TANK]
HYDROCYCLONE
KREBS
 8
                                                NUMBER
                                                NUMBER
   Z
   Z
   4
   2
   2
   4
   2
VACUUM FILTER
 2
1
4.1 X 4 X 20
30
CAST IRON
NR
ORGANIC
POLYPROPYLENE;
ABSORBER BLEED
55X SOLIDS
65X SOLIDS
118GPM
HYDROCYCLONE
16
6
8.5 X 9
CARBON STEEL
AISI 1110
ORGANIC
NATURAL RUBBER
NONE
DACRON
& QUENCHER HOLD TANK
                                            13-1149

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

SPRINGFIELD WATER, LIGHT & PWR' DALLMAN 3 (CONT.)

     FULL LOAD SLUDGE QUANTITY - M.TONS/HR  (DRY)   27.2
     MOISTURE CONTENT - X TOTAL FREE WATER         85.0
                   30.0 TPH)
 ** TREATMENT
     METHOD
     DEVICE

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT
     SITE DIMENSIONS

 ** PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     CONTROL LEVELS
     MONITOR TYPE
     MONITOR LOCATION
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE

 ** WATER BALANCE
     WATER LOOP TYPE
     MAKEUP WATER ADDITION -  LITERS/S
     SOURCE OF MAKEUP WATER

 ** CHEMICALS AND CONSUMPTION
     FUNCTION
     NAME
     PRINCIPAL CONSTITUENT
     SOURCE/SUPPLIER
     CONSUMPTION
     UTILIZATION - X
     POINT OF ADDITION

 ** FGD  SPARE CAPACITY INDICES
     ABSORBER - X
     BALL MILL - X
     VACUUM FILTER - X

 ** FGD  SPARE COMPONENT INDICES
     ABSORBER
     VACUUM FILTER
FORCED OXIDATION
SPARGER IN QUENCHER
FINAL
LANDFILL
OFF-SITE
TRUCK
CLAY LINING
50 ACRES
PH
QUENCHER PUMP IPH 4.51;
BECKMAN
PUMP DISCHARGE
AUTOMATIC
FEEDBACK
         ABSORBER FEED TANK PUMP
CLOSED
   15.1
LAKE WATER
(   239 GPM)
ABSORBENT
LIMESTONE
CALCIUM CARBONATE (CAC03)
CENTRAL STONE
1.02 STOICHOMETRIC
   67.0
BALL MILL
   20.0
   20.0
  100.0
     .3
    1.0
 	PERFORMANCE  DATA	
 PERIOD MODULE  AVAILABILITY  OPERABILITY  RELIABILITY  UTILIZATION  X REMOVAL   PER   BOILER   FGD   CAP.
                                                                 S02   PART.  HOURS HOURS   HOURS FACTOR
 10/80  SYSTEM                                                                744

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          FGD  SYSTEM  OPERATION  AT  DALLMAN  3  COMMENCED  IN OCTOBER  1980.

 11/80  SYSTEM                                                                720

 12/80  SYSTEM                                                                744

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          SINCE STARTUP NO MAJOR FGD-RELATED PROBLEMS  HAVE BEEN ENCOUNTERED.   THE
                          UTILITY HAS REPORTED  SOME CONDENSER TUBE PROBLEMS HAVE  BEEN EXPERIENCED
                          WITH THE BOILER.
  1/81   A
                    93.5
                                93.5
                                            93.5
        93.5
                                             13-1150

-------
                                                  UTILITY  FGD  SURVEY: OCTOBER  1983  - SEPTEMBER 198*

SPRINGFIELD WATER, LIGHT * PWR: DALLMAN  3  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02   PART.  HOURS HOURS  HOURS  FACTOR

      B            22.6         22.6         22.6        22.6
      SYSTEM       58.1         58.1         58.1        58.1                   744    744    432  79.0

      «*  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY SOME OUTAGE TIME WAS DUE TO  PH  EXCURSIONS  IN THE  QUENCHER
                         SECTIONS THAT NECESSITATED THE INSPECTION OF BOTH  MODULES.

                         ACCUMULATION OF FLY ASH AND SULFITE PARTICLES  LED  TO THE  REPLACEMENT  OF
                         SOME  PACKING MATERIAL IN MODULE B.

 2/81 A              .0           .0           .0          .0
      B           100.0         95.0         95.0        80.2
      SYSTEM       50.0         47.6         47.6        40.2                   672    567    270  68.6

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING FEBRUARY THE BOILER WAS OUT  OF SERVICE  APPROXIMATELY 49 HOURS.

                         MODULE A REMAINED  OUT OF SERVICE DUE TO INADEQUATE PACKING.

 3/81 A              .0           .0                       .0
      B           100.0         91.5         91.5        38.7
      SYSTEM       50.0         45.7         45.7        19.4                   744    315    144  31.5

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH APPROXIMATELY 429 HOURS OF OUTAGE TIME WAS DUE TO THE CON-
                         DENSER TUBES BEING REPLACED.

                         MODULE A WAS NOT AVAILABLE DURING MARCH DUE TO INADEQUATE PACKING.

 4/81 SYSTEM         .0           .0                       .0                   720    78      0   4.0

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL THE BOILER WAS OUT OF  SERVICE  APPROXIMATELY  642 HOURS DUE TO
                         A SCHEDULED MAINTENANCE OVERHAUL.

                         THE FGD SYSTEM WAS UNAVAILABLE THE  ENTIRE MONTH TO FACILITATE REPAIRS TO
                         PROCESS PIPING, REPLACEMENT OF THE  PACKING  MATERIAL IN THE ABSORBER TOWERS,
                         INSTALLATION OF THE STRAINER  SYSTEMS ON ABSORBER FEED TANK AND MAKEUP WATER
                         SYSTEM, AND REPAIR MINOR CORROSION  DAMAGE.

 5/81 A            39.5         33.5         33.5        27.3
      B            40.7          3.6          3.6         3.0
      SYSTEM       40.1         18.6         18.6        15.1                   744    606    113  50.0

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         FROM MAY 1  TO MAY  18 THE SYSTEM WAS UNAVAILABLE SO THAT THE HYDROCLONE
                         FRP LINE COULD BE  REPLACED WITH CARBON STEEL FOR MODULE B AND RUBBER  FOR
                         MODULE A.

 6/81 A            53.1         58.2         58.2        53.1
      B            39.2         42.9         42.9        39.2
      SYSTEM       46.2         50.6         50.6        46.2                   720    657    333  63.0

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS REMOVED FROM SERVICE TWICE  DURING THE  MONTH  DUE  TO
                         PROBLEMS WITH THE  ELECTROSTATIC PRECIPITATOR.

                         BOTH  TOWERS WERE TAKEN OUT OF SERVICE ON JUNE  19 DUE TO WET WELL HYDROCLONE
                                            13-1151

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER 1984

SPRINGFIELD WATER, LIGHT & PWR: DALLMAN 3  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS  FACTOR
PROBLEMS.
7/81
A
B
SYSTEM
40.6
67.6
54.1
29.8
57.9
43.9
29.8
57.9
43.9
28.6
55.6
42.1
744 715 313 69.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         MODULE A WAS REMOVED  FROM  SERVICE  FOR  PART OF THE MONTH FOR CLEANING THAT
                         WAS NECESSITATED  BY PLUGGED  PACKING.

                         THE MODULE B DOWNTIME DURING THE MONTH WAS ATTRIBUTED TO INSPECTIONS AND
                         CLEANING OF THE PACKING, NOZZLES,  AND  HEADERS.
  8/81   SYSTEM
                      .0
                                  .0
                                              .0
                                                          .0
                                                                              744   709
                                                                         0  69.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         BOTH MODULES WERE  UNAVAILABLE  DURING AUGUST AS THE PACKING WAS REPLACED
                         IN  BOTH  TOUERS.
  9/81   A
        B
        SYSTEM
87.9
54.2
71.1
78.0
47.0
62.5
88.5
68.8
80.0
77.8
46.9
62.4
720   718
449  55.0
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          DURING SEPTEMBER  DOWN TIME FOR MODULE A WAS DUE TO CELL PROBLEMS IN THE
                          ESP.

                          A LEAK IN THE  PIPELINE OF THE A MODULE HYDROCLONES RESULTED IN REPIPING
                          CAUSING ADDITIONAL OUTAGE TIME.

                          MODULE B WAS OFF-LINE PART OF THE MONTH FOR CLEANING AND LATER IN THE
                          MONTH  FOR HYDROCLONE REPAIRS.
 10/81  A
        B
        SYSTEM
98.8
88.6
93.7
60.8
75.4
68.0
88.3
80.3
83.6
47.0
58.4
52.7
                                                                              744   576
             392  51.0
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          DURING OCTOBER DOWN TIME FOR MODULE A WAS DUE TO AN INSPECTION OF THE
                          PACKING AND MAINTENANCE ON THE HYDROCLONE PUMPS.

                          MODULE B OUTAGE TIME DURING THE MONTH WAS FOR AN ABSORBER FEED PUMP
                          INSPECTION, WORK ON THE ABSORBER FEED TANK HYDROCLONES AND MAINTENANCE ON
                          THE QUENCHER PUMP.
 11/81  SYSTEM

 12/81  A
        B
        SYSTEM
  .0

45.3
 1.1
23.2
63.0
 1.5
32.2
63.0
 3.0
43.1
  .0

45.3
 1.1
23.2
                                              720
                                                                              744   535
                                                                                                  .0
             172  51.0
        ** PROBLEMS/SOLUTIONS/COmENTS
                          DURING NOVEMBER THRU DECEMBER 16 THE FGO SYSTEM WAS OFF-LINE FOR A
                          SCHEDULED OUTAGE.  DURING THIS TIME MODIFICATIONS WERE PERFORMED ON THE
                          FORCED OXIDATION SYSTEM.  OTHER WORK INCLUDED PIPING AND TESTING OF THE
                          PRESSURE RELIEF VALVE ON THE OX-AIR RECEIVER, WIRING AND INSTRUMENTATION
                          CONNECTIONS FOR TEMPERATURE TRANSMITTERS AND PRESSURE INDICATIONS,
                          REWIRING OF HIGH TEMPERATURE ALARM THAT CAUSED A COMPRESSOR TRIP.
                                             13-1152

-------
                                                 UTILITY  FGD  SURVEY: OCTOBER  1983  - SEPTEMBER 198*

SPRINGFIELD WATER> LIGHT t PWR: OALLMAN 3  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL    PER  BOILER   FGD   CAP.
                                                                S02   PART.  HOURS HOURS  HOURS  FACTOR
1/82 A 70.6 64.7 64.7 53.9
B .0 .0 .0 .0
SYSTEM 35.3 32.3 35.8 26.9


744 620 200 67.0
       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY MODULE B WAS OFF-LINE  DUE  TO THE  CONTINUAL WORK TO INSTALL
                         A  PRESSURE  REGULATING STATION FOR  THE FORCED  OXIDATION  SYSTEM.

                         MODULE A FORCED OXIDATION SYSTEM COMPRESSOR ACCOUNTED FOR SOME OF THE
                         OUTAGE TIME.

                         OUTAGE TIME WAS ALSO DUE TO PLUGGING  IN THE MODULE  A HYDROCLONE  FEED
                         PUMPS AND THE WET WELL HYDROCLONES.

                         MODULE A EXPERIENCED SEVERE SULFITE BUILDUP REQUIRING OUTAGE TIME FOR
                         CLEANING.

                         MODULE A EXPERIENCED A BROKEN FLANGE  IN THE FRP  LlNE OF THE OUTLET DUCT.

 2/82  A           97.2         91.4         91.4        75.6
       B             .1           .2           .2          .1
       SYSTEM      48.7         45.9         47.0        37.9                 672  556    255  65.0

       *# PROBLEMS/SOLUTIONS/COMMENTS

                         MODULE A WAS UNAVAILABLE FOR 19 HOURS DUE TO  REPAIRS ON AN ACID  LINE.

                         THE INSTALLATION OF A FORCED OXIDATION PRESSURE  REGULATING STATION FOR
                         MODULE B CONTINUED THROUGHOUT FEBRUARY.

 3/82  SYSTEM     100.0                                   .0                 744    0      0     .0

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS DOWN THE ENTIRE MONTH OF MARCH DUE  TO  A VIOLENT STORM WHICH
                         RESULTED IN THE UNBALANCING OF THE TURBINE GENERATOR.   THE UTILITY HOPES TO
                         HAVE THE UNIT BACK ON-LINE SOMETIME IN JUNE.

 4/82  SYSTEM     100.0                                   .0                 720    0      0     .0

 5/82  SYSTEM     100.0                                   .0                 744    0      0     .0

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         DURING APRIL AND MAY THE TURBINE AND  GENERATOR REPAIRS  CONTINUED.

 6/82  A           55.1         48.3         75.9        38.1
       B           73.1         76.0         92.5        59.9
       SYSTEM      64.1         62.1         84.2        49.0                 720  567     352   53.0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SYSTEM  WAS SHUT DOWN ON JUNE 1 THRU JUNE  7 FOR  A  SCHEDULED  OUTAGE AND
                         TO TEST FOR VIBRATION.

                         MODULE A WAS OFF-LINE PART OF THE  MONTH DUE TO PROBLEMS WITH THE DISCHARGE
                         VALVES ON THE QUENCHER PUMPS.

                         ADDITIONAL  PROBLEMS EXPERIENCED BY MODULE A DURING  JUNE INCLUDED PACKING
                         AND SEAL WATER PROBLEMS WITH THE MIXERS AND A LEAK  IN THE MAKEUP WATER
                         PUMP.
                                            13-1153

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SPRINGFIELD WATER, LIGHT & PWR: DALLMAN  3  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD  CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS FACTOR

                         MODULE B WAS UNAVAILABLE FOR  APPROXIMATELY 26 HOURS DUE TO A DENSITY
                         PROBLEM IN THE  ABSORBER.

                         MODULE A EXPERIENCED  BYPASS DAMPER PROBLEMS DURING THE MONTH.

  7/82  NORTH      100.0        91.2         91.2         86.6
       SOUTH      100.0        55.0         98.7         52.2
       SYSTEM     100.0        73.1         95.0         69.4                  7*4   706    516 69.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UNIT WAS DOWN  DURING JULY AS A RESULT OF EQUIPMENT PROBLEMS AND
                         SUBSEQUENT STARTUP OF THE  SCRUBBER TOWERS.

  8/82  NORTH        74.2        66.2         78.7         66.2
       SOUTH      100.0        51.7         72.5         51.7
       SYSTEM       87.1        59.0         75.6         59.0                  744   744    439 72.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         ON AUGUST 13 THE NORTH  MODULE WAS UNAVAILABLE APPROXIMATELY 11 HOURS DUE TO
                         REPAIRS BEING MADE ON THE  SEAL WATER LINE.

                         DURING THE  LAST WEEK  OF AUGUST THE NORTH MODULE WAS UNAVAILABLE 181 HOURS
                         DUE  TO PROBLEMS WITH  A  BOOSTER FAN MOTOR.

  9/82  NORTH          .0           .0           .0           .0
       SOUTH      100.0        95.7         95.7         95.1
       SYSTEM       50.0        47.8         47.8         47.6                  720   716    343 70.0

       «*  PROBLEMS/SOLUTIONS/COMMENTS

                         DURING SEPTEMBER THE  SOUTH MODULE WAS DOWN FOR 24 HOURS TO PREVENT PACKING
                         DAMAGE FROM THE INCINERATION  OF A POTASIUM BROMATE BOILER CLEANING
                         SOLUTION.

                         ON SEPTEMBER 13 AND 14  THE SOUTH MODULE WAS DOWN 20 HOURS FOR TURBINE
                         MAINTENANCE.

                         ON SEPTEMBER 20 THE SOUTH  MODULE WAS DOWN FOR 1 HOUR DUE TO A FEEDER TRIP.

 10/82  NORTH          .0           .0           .0           .0
       SOUTH          .0           .0           .0           .0
       SYSTEM         .0           .0           .0           .0                  744    52      0  4.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UNIT  WAS DOWN  OCTOBER  2 THROUGH 29 FOR A SCHEDULED OUTAGE.

                         THE  UNIT  WAS DOWN  AT DIFFERENT TIMES DURING THE PERIOD OF OCTOBER 29 TO  31
                         FOR  TURBINE BALANCE TESTS.

 11/82  NORTH        43.2         32.5         58.2         32.1
       SOUTH        64.3        53.0         55.1         52.2
       SYSTEM       53.8        42.7         56.7         42.2                  720   710    304 61.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  NORTH MODULE WAS UNAVAILABLE DURING THE PERIOD OF NOVEMBER 1 THROUGH 16
                         DUE  TO REPAIRS  ON  THE BOOSTER FAN MOTOR.

                         ELECTRICAL  PROBLEMS WITH  THE OX-AIR COMPRESSOR MOTOR AND ALARM CONTRIBUTED
                         TO THE UNAVAILABLE TIME FOR THE NORTH MODULE DURING NOVEMBER  1 THROUGH  16.
                                             13-1154

-------
                                                  UTILITY F6D  SURVEY: OCTOBER 1983 - SEPTEMBER 1984
SPRINGFIELD MATER, LIGHT I PKR: DALLMAN  3 (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X  REMOVAL    PER  BOILER   FGD   CAP.
                                                                S02   PART.  HOURS HOURS  HOURS FACTOR

                         THE  SOUTH  MODULE MAS DOMN DURING NOVEMBER 1  THROUGH 16 FOR REPAIRS ON TMO
                         SUCTION VALVES.

                         THE  UNIT MAS DOMN  DURING NOVEMBER  DUE IN  PART  TO VACUUM PUMP REPAIRS AND
                         CLOGGED MAKEUP MATER PUMPS.

                         A CHECK ON THE BYPASS DAMPER  GAUGE CONTRIBUTED TO  THE OUTAGES FOR THE UNIT
                         DURING NOVEMBER.
12/82  NORTH
       SOUTH
       SYSTEM
100.0
 99.6
 99.8
60.3
50.0
55.2
78.6
72.8
75.7
56.7
47.0
51.8
                                                                                  699
                                                                                          385  57.0
       «* PROBLEMS/SOLUTIONS/COMMENTS
                         DURING DECEMBER,  THE UNIT DEMONSTRATED LOH SCRUBBER  RELIABILITY DUE TO A
                         VARIETY OF PROBLEMS.  ONE OF WHICH WAS THE USE  OF  WET  COAL  CREATING LOAD
                         LIMITATION PROBLEMS.

                         REDUCED RELIABILITY MAS ALSO ATTRIBUTED TO VIBRATION DATA READINGS TAKEN
                         DURING DECEMBER.

                         UNIT TRIPPING OCCURRED DURING THE MONTH LOMERING SCRUBBER RELIABILITY.

                         TUBE LEAK CHECKS  ALSO CONTRIBUTED TO REDUCED  RELIABILITY DURING DECEMBER.

                         APPROXIMATELY 15X OF THE BOILER HOURS DURING  DECEMBER  INVOLVED THE
                         INJECTION OF OIL  INTO THE BOILER.  THE SCRUBBER CAN  NOT OPERATE DURING
                         THESE PERIODS DUE TO THE CLOGGING OF PACKING  MATERIAL  FROM  OIL CARRYOVER.
 1/83  NORTH
       SOUTH
       SYSTEM
 96.3
 99.2
 97.7
57.8
68.9
63.4
88.2
81.8
85.0
51.1
60.8
55.9
744   657
             416  57.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE NORTH MODULE WAS UNAVAILABLE FOR 21.5 HOURS ON JANUARY  9-10  DUE  TO  A
                         BLOWN FUSE ON A BOOSTER FAN.

                         ON JANUARY 21, ICE AND WIND STORMS PRODUCED A LOSS OF VOLTAGE  POWER  TO  THE
                         NORTH AND SOUTH MODULES THAT LED TO A DISRUPTION OF EQUIPMENT  OPERATION.

                         THE NORTH AND SOUTH MODULES WERE NOT OPERATING FOR 38.5 HOURS  DURING
                         JANUARY DUE TO THE INJECTION OF OIL INTO THE BOILER.

                         THE UNIT WAS DOWN AT DIFFERENT TIMES DURING THE PERIOD OF JANUARY 1  THROUGH
                         13 FOR TESTING AND BALANCING OF THE TURBINE. FULL SERVICE DID  NOT COMMENCE
                         UNTIL JANUARY 13.
 2/83  NORTH
       SOUTH
       SYSTEM
 67.2
 70.5
 68.8
69.4
72.5
70.9
92.6
97.4
95.0
67.4
70.5
68.9
672   653
463  72.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE NORTH MODULE WAS UNAVAILABLE FOR 1.5 HOURS DURING FEBRUARY TO FIX AN
                         ABSORBER FEED DUMP SEAL MATER LEAK.

                         BOTH MODULES MERE DOWN FOR 36 HOURS DURING THE MONTH DUE TO THE INJECTION
                         OF OIL INTO THE BOILER AT LOW MM LOADS.

                         A BOILER TRIP ON FEBRUARY 1 PRODUCED A BRIEF 30 MINUTE OUTAGE.

                         AN 18 HOUR OUTAGE ON FEBRUARY 26 RESULTED FROM PRECIPITATOR REPAIRS.
                                            13-1155

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER  1984

SPRINGFIELD WATER, LIGHT & PWR: DALLMAN  3  (CONT.)
	_	PERFORMANCE DATA		
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD  CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR
3/83 NORTH 100.0 56.8 84,8 44.0
SOUTH 96.8 71.5 91.3 55.4
SYSTEM 98.4 64.1 88.1 49.7


744 577 370 48.0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE NORTH MODULE  WAS  UNAVAILABLE FOR 24 HOURS ON MARCH 16-17 DUE TO THE
                         PLUGGING OF A STORM SEWER.

                         THE NORTH MODULE  WAS  DOWN FOR 20 HOURS DURING MARCH DUE TO THE
                         INJECTION OF OIL  INTO THE BOILER AT LOW LOADS.

                         THE SOUTH MODULE  WAS  DOWN FOR 12.5 HOURS DURING MARCH DUE TO OIL INJECTION
                         OF THE  BOILER AT  LOW  LOADS.
  4/83   NORTH
        SOUTH
        SYSTEM
 5.5
  .0
 2.7
56.8
  .0
28.4
56.8
  .0
28.4
 5.5
  .0
 2.7
720
70
                                                20   5.6
        »*  PROBLEMS/SOLUTIONS/COKMENTS
                          A  SCHEDULED  BOILER OUTAGE TOOK PLACE DURING THE MONTH THROUGH APRIL 27.
                          START-UP  PROBLEMS WERE ENCOUNTERED UNTIL APRIL 28 AND OPERATIONS RESUMED
                          ON APRIL  31.

                          BOTH  MODULES WERE UNAVAILABLE DURING THE APRIL OUTAGE AS MAINTENANCE WORK
                          WAS PERFORMED.

                          AT THE  END OF APRIL,  BOTH MODULES WERE UNAVAILABLE DUE TO PROBE PROBLEMS
                          WITH  THE  TOWER SLURRY LEVEL SYSTEM.
  5/83  NORTH
        SOUTH
        SYSTEM
99.7
64.7
82.2
55.8
30.0
42.9
65.4
48.9
57.1
55.6
29.9
42.8
                                                                              744   743
                                                                                           318  62.0
        ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE  SOUTH MODULE WAS UNAVAILABLE FROM MAY 9 TO MAY 19 DURING AN INSPECTION
                          FOR  PLUGGING.   PACKING WAS CLEANED DURING THIS OUTAGE.

                          A CRACK IN THE SILENCER ON THE OX-AIR COMPRESSOR WAS WELDED DURING THE
                          MAY  9 - MAY 19 OUTAGE.

                          A BRIEF OUTAGE OCCURRED ON MAY 21 TO CORRECT THE PH LEVEL AT THE SOUTH
                          MODULE.

                          ON MAY 23 A LEAK WAS REPAIRED ON THE ABSORBER PRESSURE-INDICATING PROBE AT
                          THE  SOUTH MODULE.

                          THE  SOUTH MODULE BOOSTER FAN WAS BEING REPAIRED FROM MAY 24 TO MAY 31,
                          1983.

                          A TWO-HOUR OUTAGE OCCURRED ON MAY 2 AT THE NORTH MODULE TO REPLACE PACKING
                          IN THE ABSORBER FEED PUMPS.
  6/83   NORTH
        SOUTH
        SYSTEM
99.9
99.6
99.7
75.3
80.2
77.8
98.6
93.5
96.1
69.9
74.4
72.2
720   668    520  65.0
                                             13-1156

-------
                                                 UTILITY  FGD SURVEY: OCTOBER  1983 - SEPTEMBER
SPRINGFIELD WATER, LIGHT t PMR: DALLMAN  3  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X  REMOVAL    PER  BOILER   FGO   CAP.
                                                                S02   PART.  HOURS HOURS  HOURS  FACTOR
      ** PROBLEMS/SOLUTIONS/COMMENTS
                        THE  UTILITY REPORTED  THAT NO MAJOR  FGO-RELATED  PROBLEMS  WERE  ENCOUNTERED
                        DURING  JUNE.
                                                                             744    742    669  74.7
                                                                             744    691    642   73.0
                                                                             720    557     544  61.0
7/83


8/83


9/83


NORTH
SOUTH
SYSTEM
NORTH
SOUTH
SYSTEM
NORTH
SOUTH
SYSTEM
86.2
90.5
88.3
100.0
100.0
100.0
100.0
100.0
100.0
88.3
92.0
90.2
92.3
93.6
92.9
98.1
97.0
97.6
97.9
98.6
98.2
100.0
100.0
100.0
100.0
99.4
99.7
88.0
91.8
89.9
85.8
86.9
86.3
75.9
75.1
75.5
       ** FROBLEMS/SOLUTIONS/COMMENTS
                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE  ENCOUNTERED
                         DURING THE PERIOD OF JULY THROUGH SEPTEMBER 1983.

                                                                             744    0
                                                                                                 .0
10/83  SYSTEM

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        THE UNIT WAS ON A SCHEDULED MAINTENANCE OUTAGE DURING THE MONTH OF OCTOBER.
11/83


12/83


1/84


2/84


NORTH
SOUTH
SYSTEM
NORTH
SOUTH
SYSTEM
NORTH
SOUTH
SYSTEM
NORTH
SOUTH
SYSTEM
100.0
100.0
100.0
99.5
98.0
98.8
96.8
95.2
96.0
100.0
100.0
100.0
91.8
93.9
92.9
97.7
95.3
96.5
97.9
96.7
97.3
95.4
94.5
95.0
96.1
99.6
97.9
99.5
97.9
98.7
99.7
100.2
100.0
100.0
100.0
100.0
73.5
75.3
74.4
95.2
92.9
94.0
92.7
91.5
92.1
95.4
94.5
95.0
                                                                             720   577
                                                                             744   725
                                                                             744   704
                                                                             696   696
                                                                                          536   59.0
                                                                                         700  72.0
                                                                                          685  65.0
                                                                                         661  65.0
       *» PROBLEMS/SOLUTIONS/COMMENTS
                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED DURING THE PERIOD OF NOVEMBER
                         1983 THROUGH FEBRUARY 1984.
 3/84  NORTH
       SOUTH
       SYSTEM
                   8.9
                   8.9
                   8.9
100.0
100.0
100.0
100.0
100.0
100.0
8.9
8.9
8.9
744
       66
66   5.0
       **  PROBLEMS/SOLUTIONS/COMMENTS
                         THE UNIT WAS REMOVED FROM SERVICE ON MARCH 3 FOR A 10-WEEK MAINTENANCE
                         OUTAGE.
 4/84  NORTH
       SOUTH
       SYSTEM
                    .0
                    .0
                    .0
                           .0
                           .0
                           .0
                                   720
                                                       .0
                                            13-1157

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER  1984

SPRINGFIELD WATER, LIGHT & PWR: DALLMAN 3  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD   CAP.
                                                                 302   PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OUT OF SERVICE FOR  A  MAINTENANCE  OUTAGE DURING APRIL.

 5/84  NORTH       20.3        87.7         99.3         17.8
       SOUTH       20.3        97.7       100.0         19.8
       SYSTEM      20.3        92.7         99.6         18.8                  744   151    140  13.3

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS STARTED MAY 25 AFTER  ITS SPRING MAINTENANCE OUTAGE.
                                                                              720    719   705  77.0



                                                                              744    742 .   722  75.0

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR  FGD-RELATED  PROBLEMS  WERE  REPORTED  DURING JUNE  AND  JULY.

 8/84  SYSTEM                                                                 744

 9/84  SYSTEM                                                                 720

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS  UNAVAILABLE  FOR  AUGUST  AND SEPTEMBER 1984.
6/84


7/84


NORTH
SOUTH
SYSTEM
NORTH
SOUTH
SYSTEM
97.1
98. 6
97.8
100.0
100.0
100.0
97.2
98.7
98.0
97.8
96.8
97.3
100.0

100.0
100.0
100.0
100.0
97.1
98.6
97.8
97.6
96.5
97.0
                                             13-1158

-------
                                                 UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
                                          SECTION 13
              DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY M/FGD - MM
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW
SUNFLOWER
HOLCOMB
1
HOLCOMB
KANSAS
B
13.
206.
******
280
3*7
280
280
3*7
ELECTRIC





( .030 LB/MMBTU)
t .*80 LB/MMBTU)
(****** LB/MMBTU)





 ** UNIT DATA - BOILER AND STACK
    BOILER SUPPLIER
    BOILER TYPE
    BOILER SERVICE LOAD
    DESIGN BOILER FLUE GAS FLOW - CU.M/S
    BOILER FLUE GAS TEMPERATURE - C
    STACK HEIGHT - M
    STACK SHELL
    STACK TOP DIAMETER - M

 ** FUEL DATA
    FUEL TYPE
    FUEL GRADE
    AVERAGE HEAT CONTENT - J/G
    RANGE HEAT CONTENT - BTU/LB
    AVERAGE ASH CONTENT - 7.
    RANGE ASH CONTENT - 7.
    AVERAGE MOISTURE CONTENT - 7.
    RANGE MOISTURE CONTENT - 7.
    AVERAGE SULFUR CONTENT - 7.
    RANGE SULFUR CONTENT - 7.
    AVERAGE CHLORIDE CONTENT - 7.
    RAN3E CHLORIDE CONTENT - 7.

«** PARTICLE CONTROL

 »* MECHANICAL COLLECTOR
    NUM3ER
    TYPE

 ** FABRIC FILTER
    NUMBER
    SUPPLIER
    NUMBER OF COMPARTMENTS
    NUMBER OF SPARE COMPARTMENTS
    INLET FLUE GAS CAPACITY - CU.M/S
    INLET FLUE GAS TEMPERATURE - C
    PRESSURE DROP - KPA
    PARTICLE REMOVAL EFFICENCY - 7.
    TYPICAL GAS/CLOTH RATIO - M/MIN

 ** ESP
    NUMBER
    TYPE

 ** PARTICLE SCRUBBER
    NUMBER
    GENERIC TYPE
    SPECIFIC TYPE
    TRADE NAME/COMMON NAME
    SHELL GENERIC MATERIAL
    SHELL SPECIFIC MATERIAL
    LINER GENERIC MATERIAL
    LINER SPECIFIC MATERIAL
BABCOCK ft WILCOX
PULVERIZED COAL
BASE
               (13*0000 ACFM)
               ( 260 F)
               ( *75 FT)

               ( 16.3 FT)
               (  8313 BTU/LB)
                7880-8250
  632.35
  126.7
  1*5.
CONCRETE
    5.0
COAL
SUBBITUMINOUS
19336.

    5.56
6.0-8.0
   29.70
30.0-32.5
      .3*
******
      .02
******
 0
NONE
JOY MANUFACTURING
  1*
   2
  316.2        ( 670000 ACFM)
   81.7        ( 179 F)
    7.5        (30.0 IN-H20)
   99.0
      .6        (  2.0 FT/MIN)
 0
NONE
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
                                            13-1159

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

SUNFLOWER ELECTRIC: HOLCOMB 1 (CONT.)

     GAS CONTACTING DEVICE TYPE

*** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X
     DESIGN COAL HEAT CONTENT - J/G
     DESIGN COAL ASH CONTENT - X

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION  MATERIAL GENERIC TYPE
     CONSTRUCTION  MATERIAL SPECIFIC TYPE

 »* ABSORBER
     NUMBER
     NUM3ER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     DIMENSIONS -  FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X
     PARTICLE REMOVAL EFFICENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION  MATERIAL GENERIC TYPE
     CONSTRUCTION  MATERIAL SPECIFIC TYPE

 ** REHEATER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION  MATERIAL GENERIC TYPE
     CONSTRUCTION  MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     FUNCTION
     APPLICATION
    N/A
    THROWAMAY PRODUCT
    SPRAY DRYING
    LIME/SPRAY DRYING
    NONE
    JOY MFG/NIRO ATOMIZER
    UNITED ENGINEERS t CONSTRUCTORS
    FULL SCALE
    NEW
 -  X   99.87
       80.00
         .0
     1
     8/83
     7/83
     6/80
                   (   7800 BTU/LB)
    1.00
18142.8
   12.00
    NR
    NR
     3
     1
    SPRAY DRYER
    NR
    ROTARY ATOMIZER
    50.9 FT DIA.  X 39.* FT HT.  X 60 DEC.  CONE UNDER
    NR
    NR
    NS
    NONE
    N/A
    N/A
                   (  670000 ACFM)
                   (   2*9 F)
  316.17
  120.6
   80.0
   99.8
    NONE
     0
    N/A
    N/A
    N/A
    NR
    NR
     0
    NONE
    N/A
    N/A
    NONE
    N/A
     2
     0
    NR
    NR
    FORCED DRAFT
13-1160

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER  198
-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

SUNFLOWER ELECTRIC: HOLCOMB 1 (CONT.)
 ** PROCESS CONTROL AND INSTRUMENTATION
     CONTROL LEVELS                             FINAL WASTE  =  30X MOISTURE

 ** WATER BALANCE
     WATER LOOP TYPE                            CLOSED  IDESIGNJ
     SOURCE OF MAKEUP WATER                     6 DEEP  WELLS

 ** CHEMICALS AND CONSUMPTION
     FUNCTION                                   ABSORBENT
     NAME                                       LIME
     CONSUMPTION                                2.3 TPH

 ** FGD SPARE CAPACITY INDICES
     ABSORBER - X                                  50.0

 ** FGD SPARE COMPONENT INDICES
     ABSORBER                                       1.0
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER  BOILER  FGD   CAP.
                                                                S02   PART. HOURS HOURS  HOURS FACTOR


  7/83  SYSTEM                                                                 744

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT INITIAL START-UP COMMENCED IN JULY, 1983.

  8/83  SYSTEM                                                                 744

  9/83  SYSTEM                                                                 720

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED TYPICAL PROBLEMS ASSOCIATED WITH START-UP DURING THE
                         ENTIRE THIRD QUARTER.  COMPUTER  PROBLEMS WERE  EXPERIENCED DURING THE LAST
                         WEEK OF  SEPTEMBER  AND REQUIRED THE  REPLACEMENT OF A DISK.

 10/83  SYSTEM                                                                 744

 11/83  SYSTEM                                                                 720

 12/83  SYSTEM                                                                 744

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS  UNAVAILABLE FOR  THE FOURTH QUARTER  OF 1983.

  1/84  SYSTEM                                                                 744

  2/84  SYSTEM                                                                 696

       »*  PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD  SYSTEM WAS DOWN  APPROXIMATELY FOUR WEEKS DURING THE  LAST PART
                         OF JANUARY AND THE FIRST PART OF FEBRUARY FOR  ABSORBER CLEANING.

  3/84  SYSTEM                                                                 744

  4/84  SYSTEM                                                                 720

  5/84  SYSTEM                                                                 744

  6/84  SYSTEM                                                                 720

  7/84  SYSTEM                                                                 744

  8/84  SYSTEM                                                                 744
                                             13-1162

-------
                                                 UTILITY  F6D  SURVEY: OCTOBER  1983  - SEPTEMBER  1984

SUNFLOWER ELECTRIC: HOLCOMB 1 (CONT. )
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   F60    CAP.
                                                                S02   PART.  HOURS HOURS   HOURS  FACTOR


 9/84 SYSTEM                                                                 720

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED THAT OVERALL F6D SYSTEM AVAILIBILITY DURING THE  FIRST
                         THREE  QUARTERS OF  1964 MAS ESTIMATED AT 85X. NO MAJOR FGO-RELATED OUTAGES
                         WERE REPORTED.
                                             13-1163

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY M/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** ESP
     NUMBER

 ** PARTICLE SCRUBBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     502 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL  EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY -  7.
     ENERGY CONSUMPTION - 7.
 TENNESSEE VALLEY AUTHORITY
 PARADISE
 PARADISE
 KENTUCKY
 C
    47.
   387.
 ******
  2558
   704
   650
   668
   704
(   .110 LB/MMBTU)
(   .900 LB/MMBTU)
(****** LB/MMBTU)
BABCOCK ft
CYCLONE
BASE
1014.58
148.9
183.
NR
7.9
WILCOX


(2150000 ACFM)
( 300 F)
( 600 FT)

( 26.0 FT)
 COAL
 BITUMINOUS
 29075.

    17.30
 ******
    10.00
 ******
     3.20
 ******
      .10
 ******
(  12500 BTU/LB)
 ******
  6
  1
 VENTURI TOWER
 VARIABLE-THROAT/TOP-ENTRY PLUMB BOB
 N/A
 STAINLESS STEEL
 AUSTENITIC
 NONE
 N/A
 NONE
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIMESTONE
 GE ENVIRONMENTAL SERVICES
 IN-HOUSE
 FULL SCALE
 RETROFIT
7.   94.20
    84.00
     2.6
                                             13-1164

-------
TENNESSEE VALLEY AUTHORITY:  PARADISE  1 (CONT.)

    CURRENT STATUS
    COMMERCIAL START-UP
    INITIAL START-UP
    CONTRACT AWARDED

 ** DESIGN AND OPERATING  PARAMETERS

 »» QUENCHER/PRESATURATOR
    CONSTRUCTION MATERIAL GENERIC TYPE
    CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
    NUMBER
    NUMBER OF SPARES
    GENERIC TYPE
    SPECIFIC TYPE
    TRADE NAME/COMMON TYPE
    SHELL GENERIC MATERIAL
    SHELL SPECIFIC  MATERIAL
    SHELL MATERIAL  TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC  MATERIAL
     LINER MATERIAL  TRADE.NAME/COMMON TYPE
    GAS CONTACTING  DEVICE TYPE
    NUK5ER OF CONTACTING ZONES
     L/G RATIO -  L/CU.M
    S02 REMOVAL  EFFICIENCY - X

 »* MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
    GENERIC TYPE
     SPECIFIC TYPE
    TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     TEMPERATURE  INCREASE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC  MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
    DEVICE TYPE
     NUMBER
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
 1
 7/83
 5/83
 3/79
NR
NR
 6
 1
COMBINATION TOWER
VENTURI/SPRAY
N/A
STAINLESS STEEL
AUSTENITIC
TYPE 3I7L
NONE
N/A
N/A
NONE
 3
               ( 85.0 GAL/1000 ACF)
   84.2
PRIMARY COLLECTOR
IMPINGEMENT
BAFFLE
CLOSED VANE
NR
NR
WASTE HEAT RECOVERY
GAS-FLUID
TUBE BUNDLE
   27.8        (   50 F)
STAINLESS STEEL
AUSTENITIC
CENTRIFUGAL
BOOSTER
INDUCED DRAFT
DRY
CARBON STEEL
NR
NR
NR
NR
HR
NR
NR
NR
NR
NR
NR
WET BALL MILL
COMPARTMENTED
NR
  3
                                            13-1165

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

TENNESSEE VALLEY AUTHORITY: PARADISE 1 (CONT,

     FULL LOAD DRY FEED CAPACITY - M.TONS/HR

 ** TANKS
     SERVICE
                    1984

                    )
     REAGENT PREP PRODUCT
     ABSORBER RECYCLE
     SCRUBBER RECYCLE
     NR

 ** PUMPS
     SERVICE
     NA

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS

 *»* SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 *» DISPOSAL
     NATURE
     TYPE
     SITE TREATMENT

 ** WATER BALANCE
     WATER  LOOP TYPE

 ** FGD  SPARE  CAPACITY  INDICES
     ABSORBER  - X

 ** FGD  SPARE  COMPONENT INDICES
     ABSORBER
                           3.6
(    4 TPH)
                       NUMBER

                       ****
                       ****
                       *«**
                       ****
                       NUMBER

                       ****
                       VACUUM FILTER
                        3
                       1
                       40X SOLIDS
                       SOX SOLIDS
                       THICKENER
                        1
                       8X  SOLIDS
                       40X SOLIDS
                       FORCED OXIDATION
                       REACTION TANK
                       N/A
                       FINAL
                       LANDFILL
                       NONE
                       CLOSED


                          20.0


                           1.0
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS FACTOR
  5/83  SYSTEM

  6/83  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
                                                    744

                                                    720
  7/83  SYSTEM

  8/83  SYSTEM

  9/83  SYSTEM
THE FGD SYSTEM COMMENCED OPERATION IN MAY AND IS CURRENTLY IN THE START UP
PHASE OF OPERATION.

                                                    744

                                                    744

                                                    720
                                             13-1166

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER

TENNESSEE VALLEY AUTHORITY: PARADISE  1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR


      «« PROBLEMS/SOLUTIONS/COMMENTS

                        BOTH  UNITS 1 AND Z ARE CURRENTLY IN THE SHAKEDOWN/DEBUGGING PHASE  OF OPERA-
                        TION.   THE UTILITY REPORTED THAT CONTRACT TESTING  AND STATE CERTIFICATION
                        TESTING ARE CURRENTLY BEING CONDUCTED.

                        THE UTILITY REPORTED BYPASS DAMPER PROBLEMS AT UNITS 1 AND  2 DURING THE
                        THIRD QUARTER OF 1983.

                        DUCTWORK GAS TURNING VANES COLLAPSED DURING THE THIRD QUARTER.

                        PLUGGING PROBLEMS OCCURRED WITHIN THE FORCED-OX SYSTEM DURING THIS PERIOD.
                        SLURRY WAS BACKING UP INTO THE SPARGER  LINES FORCING A SHUT DOWN FOR CLEAN-
                        ING.

                        THICKENER PROBLEMS WERE ALSO EXPERIENCED DURING THE THIRD QUARTER.  THE
                        RAKE  ARMS WERE BREAKING DUE TO UNEXPECTED HIGH PARTICLE SIZES AND  THE RAPID
                        SETTLING OF SOLIDS.

                        THE UTILITY REPORTED MIST ELIMINATOR PROBLEMS DURING THE PERIOD DUE TO
                        PLUGGING PINCH VALVES AND IMPROPERLY WORKING DRAINS.

10/83 SYSTEM                                                                 744

11/83 SYSTEM                                                                 720

12/83 SYSTEM                                                                 744

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                        DURING THE FOURTH QUARTER OF 1983.  THE MIST ELIMINATOR AND THICKENER PROB-
                        LEMS  EXPERIENCED DURING THE THIRD QUARTER WERE STILL PRESENT BUT TO A LES-
                        SER DEGREE.

                        THE MIST ELIMINATOR PLUGGING PROBLEMS EXPERIENCED  DURING THE THIRD QUARTER
                        WERE  BELIEVED TO BE THE RESULT OF IMPROPER WASHING.

                        THE THICKENER RAKE ARM PROBLEM EXPERIENCED DURING  THE THIRD QUARTER WAS
                        SOLVED BY REMOVING SOLIDS FROM THE THICKENER MORE  FREQUENTLY AND BY READ-
                        JUSTING THE TORQUE MEASURING DEVICE TO RESPOND TO  TORQUE ON THE RAKE ARM
                        TRUSSES RATHER THAN THE RAKE ARMS.  SOLIDS SETTLING IN A CONICAL SHAPE WERE
                        NOT DISTRIBUTING AN EVEN LOAD TO THE RAKE ARMS AND THUS MAXIMUM TORQUE WAS
                        NOT REACHED.  AS A RESULT, THE RAKE ARMS WERE BREAKING.

 1/84 SYSTEM                                                                 744

 2/84 SYSTEM                                                                 696

 3/84 SYSTEM                                                                 7'»<*

      ** PROBLEMS/SOLUTIONS/COMMENTS

                        DURING THE FIRST QUARTER, ELECTRICAL PROBLEMS RESULTED IN RAW FLUE GAS
                        ENTERING THE NOREL PLASTIC MIST ELIMINATORS WITHOUT QUENCHING. THE MIST
                        ELIMINATOR MELTED AND FORCED THE UTILITY TO BYPASS.

 4/84 SYSTEM                                                                 72°

 5/84 SYSTEM                                                                 ™

 6/84 SYSTEM                                                                 72°
                                            13-1167

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER  1984

TENNESSEE VALLEY AUTHORITY: PARADISE  1  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 SOS  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NEW MIST  ELIMINATORS  WERE  INSTALLED DURING THE SECOND QUARTER OF 1984.
                         THEY WERE SUPPLIED  BY MUNTERS AND ARE CAPABLE OF WITHSTANDING RAW FLUE
                         GAS TEMPERATURES OF 350  DEGREES F.

  7/84  SYSTEM                                                                 744

  8/84  SYSTEM                                                                 744

  9/84  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY EXPERIENCED  PROBLEMS WITH CORROSION IN THE CARBON STEEL SEC-
                         TION OF THE REHEAT  U-TUBE  BUNDLES. AIR TRAPPED WITHIN THE BUNDLES COULD
                         NOT BE REMOVED  AND  THE RESULTING LOWERED TEMPERATURE CAUSED CORROSION.
                         THE UTILITY ATTEMPTED TO REMOVE THE AIR BY PURGING THE TUBES WITH STEAM
                         AND BACK  FILLING WITH WATER.  THEY ALSO TRIED PULLING A VACUUM ON THE
                         TUBES AND BACK  FILLING WITH WATER. THE TUBES HAVE SINCE BEEN REPLACED
                         WITH STAINLESS  STEEL  AND HAVE VENTED WATER BOXES. THIS HAS ENABLED THEM
                         TO INCREASE REHEAT  TEMPERATURES FROM 150 TO 170 DEGREES F. TWO OF THE
                         SIX MODULES AT  UNIT 1 NOW  HAVE STAINLESS STEEL U-TUBES WITH VENTED WATER
                         BOXES.

                         PROBLEMS  WERE EXPERIENCED  WITH THE LOUVER TYPE BYPASS DAMPERS DURING THE
                         FIRST THREE QUARTERS  OF  1984. DUE TO HIGH FLUE GAS VELOCITY, THE STAIN-
                         LESS STEEL SEAL STRIPS BROKE  OFF. THE UTILITY MADE AN ATTEMPT TO WELD
                         FIX PLATES TO THE DAMPERS  WHICH WAS UNSUCCESSFUL. THE LOUVER TYPE DAMPERS
                         WILL NOW  BE REPLACED  WITH  THE GUILLOTINE TYPE.

                         THE UTILITY REPORTED  THAT  THE SLUDGE DEWATERING SYSTEM WILL BE CONVERTED
                         TO A WET  PUMP SYSTEM  WITH  WET STACKING SIMILAR TO THAT DEVELOPED AT WIDOWS
                         CREEK. SLUDGE WILL  BE PUMPED  DIRECTLY TO A DISPOSAL AREA WITHOUT TREATMENT
                         BY THICKENING OR VACUUM  FILTRATION.

                         THE UTILITY REPORTED  THAT  NO  MAJOR FGD SYSTEM OUTAGES OCCURRED DURING  THE
                         FIRST THREE QUARTERS  OF  1984. MODULES ARE ROUTINELY TAKEN OUT OF SERVICE
                         IN ROTATION FOR APPROXIMATELY ONE WEEK AND MAINTENANCE WORK OR MODIFICA-
                         TIONS ARE MADE.
                                             13-1168

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
              DESIGN AND  PERFORMANCE DATA FOR OPERATIONAL DOMESTIC F6D SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION  LIMITATION - N6/J
S02 EMISSION  LIMITATION - NG/J
NOX EMISSION  LIMITATION - NG/J
NET PLANT GENERATING  CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MM
EQUIVALENT SCRUBBED CAPACITY - MW

 «* UNIT DATA -  BOILER AND STACK
    BOILER SUPPLIER
    BOILER TYPE
    BOILER SERVICE LOAD
    DESIGN BOILER FLUE GAS FLOW - CU.M/S
    BOILER FLUE GAS  TEMPERATURE - C
    STACK HEIGHT - M
    STACK SHELL
    STACK TOP DIAMETER - M

 »* FUEL DATA
     FUEL TYPE
     FUEL GRADE
    AVERASE  HEAT CONTENT - J/G
     RAN3E HEAT  CONTENT - BTU/LB
    AVERAGE  ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE  MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE  SULFUR CONTENT - 7.
     RANGE SULFL'R CONTENT - 7.
     AVERAGE  CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - X

»»* PARTICLE  CONTROL

 *« ESP
     NUMBER

 »* PARTICLE  SCRUBBER
     NUMBER
     NUKSER OF SPARES
     GENERIC  TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC  MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING  DEVICE TYPE

»** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS  TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02  REMOVAL EFFICIENCY  -  7.
     ENERGY CONSUMPTION - 7.
TENNESSEE VALLEY  AUTHORITY
PARADISE
 PARADISE
 KENTUCKY
 C
   47.
   387.
 «*K***
 2558
   704
   650
   668
   704
(   .110 LB/MMBTU)
(   .900 LB/MMBTU)
(*****» LB/MMBTU)
BABCOCK ft  UILCOX
CYCLONE
BASE
  1014.58
   148.9
   183.
NR
    7.9
(2150000 ACFM)
(  300 F)
(  600 FT)

(  26.0 FT)
 COAL
 BITUMINOUS
 29075.

    10.00
 ******
    10.00
 ******
     3.20
 ******
      .10
 ******
( 12500 BTU/LB)
  6
  1
 VENTURI TOWER
 VARIABLE-THROAT/TOP-ENTRY PLUMB BOB
 N/A
 STAINLESS STEEL
 AUSTENITIC
 NOME
 N/A
 NONE
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIMESTONE
 GE ENVIRONMENTAL SERVICES
 IN-HOUSE
 FULL SCALE
 RETROFIT
7.   94.20
    84.00
     2.6
                                             13-1169

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TENNESSEE VALLEY AUTHORITY: PARADISE 2 (CONT.)
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 *» DESIGN AND OPERATING PARAMETERS

 »* QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     L/G RATIO - L/CU.M
     S02 REMOVAL EFFICIENCY - 7.

 ** MIST ELIMINATOR
     FRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     TEMPERATURE INCREASE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 »* DUCTWORK
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     NUM3ER
 1
12/83
 7/83
 3/79
NR
NR
 6
 1
COMBINATION TOWER
VENTURI/SPRAY
N/A
STAINLESS STEEL
AUSTENITIC
TYPE 317L
NONE
N/A
N/A
NONE
 3
               (  85.0 GAL/1000 ACF)
   84.2
PRIMARY COLLECTOR
IMPINGEMENT
BAFFLE
CLOSED VANE
NR
NR
WASTE HEAT RECOVERY
GAS-FLUID
TUBE BUNDLE
   27.8        (    50 F)
STAINLESS STEEL
AUSTENITIC
CENTRIFUGAL
BOOSTER
INDUCED DRAFT
DRY
CARBON STEEL
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
WET BALL MILL
COMPARTMENTED
NR
 3
                                             13-1170

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
TENNESSEE VALLEY AUTHORITY:  PARADISE Z (CONT.)

    FULL LOAD DRY FEED CAPACITY - M.TONS/HR

 ** 'TANKS
    SERVICE
     REAGENT PREP PRODUCT
     ABSORBER RECYCLE
     SCRUBBER RECYCLE
     NR

 *» PUMPS
     SERVICE
     NA
 *» SOLIDS CONCENTRATING/DEWATERINS
     DEVICE
     NUMBER
     NUMBER OF  SPARES
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS

 «» SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUM5ER
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS

*#* SLUDGE

 »» TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     SITE TREATMENT

 ** MATER BALANCE
     WATER LOOP TYPE

 »* FGO SPARE CAPACITY INDICES
     ABSORBER - X

 ** FGD SPARE COMPONENT INDICES
     ABSORBER
    3.6
NUMBER

****
***»
***»
****
                                                NUMBER

                                                ***«
VACUUM FILTER
 3
1
40X SOLIDS
8QX SOLIDS
THICKENER
 1
8X SOLIDS
40X SOLIDS
FORCED OXIDATION
REACTION TANK
N/A
FINAL
LANDFILL
NONE
CLOSED
   20.0
    1.0
                     TPH)
 	PERFORMANCE DATA	
 PERIOD MODULE  AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD    CAP.
                                                                502   PART. HOURS  HOURS   HOURS FACTOR
 7/Q3  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
 8/83  SYSTEM

 9/83  SYSTEM
                         THE UTILITY REPORTED THAT INITIAL START-UP  FOR  THE  FGD  SYSTEM AT UNIT 2
                         COMMENCED IN JULY.
                              720
                                            13-1171

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER  1984

TENNESSEE VALLEY AUTHORITY: PARADISE  2  (CONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR


       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THICKENER  PROBLEMS  WERE  EXPERIENCED DURING THE THIRD QUARTER.  THE RAKE
                         ARMS WERE  BREAKING  DUE TO UNEXPECTED HIGH PARTICLE SIZES AND THE RAPID
                         SETTLING OF SOLIDS.

                         PLUGGING PROBLEMS OCCURRED WITHIN THE FORCED-OX SYSTEM DURING THIS PERIOD.
                         SLURRY WAS BACKING  UP INTO THE  SPARGER LINES FORCING A SHUT DOWN FOR CLEAN-
                         ING.

                         DUCTWORK GAS TURNING VANES COLLAPSED DURING THE THIRD QUARTER.

                         THE UTILITY REPORTED BYPASS DAMPER PROBLEMS AT UNITS 1 AND 2 DURING THE
                         THIRD QUARTER OF 1983.

                         BOTH UNITS 1 AND 2  ARE CURRENTLY IN THE SHAKEDOWN/DEBUGGING PHASE OF OPER-
                         ATION.  THE UTILITY REPORTED  THAT CONTRACT TESTING AND STATE CERTIFICATION
                         TESTING ARE CURRENTLY BEING CONDUCTED.

                         THE UTILITY REPORTED MIST ELIMINATOR PROBLEMS DURING THE PERIOD DUE TO
                         PLUGGING PINCH  VALVES AND IMPROPERLY WORKING DRAINS.

 10/83  SYSTEM                                                                 744

 11/83  SYSTEM                                                                 720

 12/83  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO  MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FOURTH QUARTER. THE MIST ELIMINATOR AND THICKENER PROBLEMS
                         EXPERIENCED DURING  THE THIRD  QUARTER WERE STILL PRESENT BUT TO A LESSER
                         DEGREE.

                         THE MIST ELIMINATOR PLUGGING  PROBLEMS EXPERIENCED DURING THE THIRD QUARTER
                         WERE BELIEVED TO BE THE  RESULT  OF IMPROPER WASHING.

                         THE THICKENER RAKE  ARM PROBLEM  EXPERIENCED DURING THIRD QUARTER OF 1983 MAS
                         SOLVED BY  REMOVING  SOLIDS FROM  THE THICKENER MORE FREQUENTLY AND BY READ-
                         JUSTING THE TORQUE  MEASURING  DEVICE TO RESPOND TO TORQUE ON THE RAKE ARM
                         TRUSSES RATHER  THAN THE  RAKE  ARMS.  SOLIDS SETTLING IN A CONICAL SHAPE WERE
                         NOT DISTRIBUTING AN EVEN LOAD TO THE RAKE ARMS AND THEIR MAXIMUM TORQUE WAS
                         NOT REACHED.  AS A  RESULT, THE  ARMS WERE BREAKING.

                         THE UTILITY REPORTED THAT UNIT  2 WAS CERTIFIED IN COMPLIANCE DURING DECEM-
                         BER.

  1/84  SYSTEM                                                                 744

  2/84  SYSTEM                                                                 696

  3/84  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FIRST QUARTER, ELECTRICAL PROBLEMS RESULTED IN RAW FLUE GAS
                         ENTERING THE  NOREL  PLASTIC MIST ELIMINATORS WITHOUT QUENCHING.  THE MIST
                         ELIMINATOR MELTED AND FORCED  THE UTILITY TO BYPASS.  NEW CEILCOTE MIST
                         ELIMINATORS WILL BE INSTALLED AT UNIT 2 DURING THE  LAST QUARTER OF 1984.

  4/84  SYSTEM                                                                 720

  5/84  SYSTEM                                                                 744
                                             13-1172

-------
                                                  UTILITY  F6D  SURVEY:  OCTOBER  1983  -  SEPTEMBER

TENNESSEE VALLEY AUTHORITY: PARADISE  2  CCONT.)
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD    CAP.
                                                                S02   PART.  HOURS  HOURS   HOURS  FACTOR


 6/84 SYSTEM                                                                 720

 7/84 SYSTEM                                                                 744

 8/84 SYSTEM                                                                 744

 9/84 SYSTEM                                                                 720

      **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY EXPERIENCED PROBLEMS WITH CORROSION IN THE CARBON STEEL SEC-
                         TION OF THE REHEAT U-TUBE BUNDLES.   AIR TRAPPED WITHIN THE BUNDLES COULD
                         NOT  BE  REMOVED AND THE RESULTING LOWERED TEMPERATURE CAUSED CORROSION.
                         THE  UTILITY ATTEMPTED TO REMOVE THE AIR BY  PURGING THE TUBES WITH  STEAM
                         AND  BACK FILLING WITH WATER.   THEY ALSO TRIED PULLING A  VACUUM  ON  THE
                         TUBES AND BACK FILLING WITH WATER.   THE TUBES HAVE SINCE BEEN REPLACED
                         WITH STAINLESS STEEL AND HAVE VENTED WATER  BOXES.   THIS  HAS ENABLED THEM
                         TO  INCREASE REHEAT TEMPERATURES FROM 150 TO 170 DEGREES  F.

                         PROBLEMS WERE  EXPERIENCED WITH THE LOUVER TYPE BYPASS DAMPERS DURING  THE
                         FIRST THREE QUARTERS OF 1984.  DUE TO HIGH  FLUE GAS VELOCITY, THE  STAIN-
                         LESS STEEL SEAL STRIPS BROKE OFF.  THE UTILITY MADE AN ATTEMPT  TO  WELD
                         FIX PLATES TO  THE  DAMPERS WHICH WAS UNSUCCESSFUL.   THE  LOUVER TYPE DAMPERS
                         MILL NOW BE REPLACED WITH THE GUILLOTINE TYPE.

                         THE UTILITY REPORTED THAT THE SLUDGE DEWATERING SYSTEM WILL BE  CONVERTED
                         TO  A WET PUMP  SYSTEM WITH WET STACKING SIMILAR TO THAT DEVELOPED AT WIDOWS
                         CREEK.   SLUDGE WILL BE PUMPED DIRECTLY TO A DISPOSAL AREA WITHOUT  TREATMENT
                         BY  THICKENING  OR VACUUM FILTRATION.

                         THE UTILITY REPORTED THAT NO MAJOR FGD SYSTEM OUTAGES OCCURRED  DURING THE
                         FIRST THREE QUARTERS OF 1984.  MODULES ARE  ROUTINELY TAKEN OUT  OF  SERVICE
                         IN  ROTATION FOR APPROXIMATELY ONE WEEK AND  MAINTENANCE WORK OF  MODIFICA-
                         TIONS ARE MADE.
                                            13-1173

-------
UTILITY F6D SURVEY? OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC F6D SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7,
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RAKGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** ESP
     NUMBER

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN S02 REMOVAL EFFICIENCY - 7.
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
TENNESSEE VALLEY AUTHORITY
WIDOWS CREEK
7
BRIDGEPORT
ALABAMA
C
   52.         (
  516.         (
******
 1978
  575
  575
  495
  575
   .120 LB/MMBTU)
  1.200 LB/MMBTU)
(****** LB/MMBTU)
******
PULVERIZED COAL
BASE
********
*******
******
NR
*******
(******* ACFM)
<**** F)
(**** FT)

(***** FT)
COAL
BITUMINOUS
25819.

   17.00
******
********
******
    3.70
******
********
******
(  11100 BTU/LB)
 ******
VENTURI TOWER
VARIABLE-THROAT/VERTICALLY-ADJUSTABLE ROD DECKS
ROD SCRUBBER
NR
NR
NR
NR
NONE
THROWAWAY PRODUCT
WET SCRUBBING
LIMESTONE
COMBUSTION ENGINEERING
IN-HOUSE
FULL SCALE
RETROFIT
   80.00
 1
 9/81
 3/81
                                            13-1174

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

TENNESSEE VALLEY AUTHORITY:  WIDOWS CREEK 7 CCONT.)

     CONTRACT AWARDED                            10/77

 ** DESIGN AND OPERATING PARAMETERS
 ** QUENCHER/PRESATURATOR
     CONSTRUCTION  MATERIAL GENERIC TYPE
     CONSTRUCTION  MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     GENERIC  TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE  NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE  NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     INLET GAS TEMPERATURE - C

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER  PER SYSTEM
     GENERIC  TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER  OF STAGES
     NUMBER  OF PASSES PER  STAGE
     DISTANCE BETWEEN STAGES - CM
     VANE ANGLES - DEGREES
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 »* REHEATER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     TEMPERATURE INCREASE  - C
     INLET FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 «* FANS
     NUMBER
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC  TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE
NR
NR
SPRAY TOWER
OPEN COUNTERCURRENT SPRAY
N/A
COMBUSTION ENGINEERING
NR
NR
NR
NR
NR
NR
NONE
   48.9        (  120 F)
PRECOLLECTOR
 4
NR
NR
NR
HORIZONTAL
    1
    1
     .76       (  .3 IN)
  45
ORGANIC
FIBER-REINFORCED POLYESTER
 4
IN-LINE
NR
NR
   27.8        (   50 F)
   48.9        (  120 F)
NR
NR
CENTRIFUGAL
BOOSTER
FORCED DRAFT
DRY
CARBON STEEL
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
                                            13-1175

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TENNESSEE VALLEY AUTHORITY: WIDOWS CREEK 7  (CONT. )
 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 ** TANKS
     SERVICE
     SCRUBBER RECYCLE
     ABSORBER RECYCLE
     REAGENT PREP PRODUCT

 ** PUMPS
     SERVICE
      LIMESTONE SLURRY FEED
      SCRUBBER RECIRCULATION
      ABSORBER RECIRCULATION

 ** SOLIDS CONCENTRATING/DEWATERING
      DEVICE

*** SLUDGE

 *» TREATMENT
      METHOD
      DEVICE
      PROPRIETARY PROCESS

 ** DISPOSAL
      NATURE
      TYPE
      SITE TREATMENT
                       WET BALL MILL
                       COMPARTMENTED
                       NR
                       NUMBER
                          4
                          5
                          1
                       NUMBER

                          4
                          8
                         12
                       NR
                       FORCED OXIDATION
                       NA
                       NA
                       FINAL
                       PO^JD
                       NONE
 	PERFORMANCE  DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   7.  REMOVAL   PER   BOILER   FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR
  3/81   SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
                                                    744
                          INITIAL OPERATIONS OF  THE WIDOWS  CREEK  7  FGD  SYSTEM BEGAN IN  MARCH, 1981.
                          THE  SYSTEM  IS  PRESENTLY  IN  A  SHAKEDOWN/DEBUGGING  PHASE  WITH COMMERCIAL
                          OPERATIONS  EXPECTED  IN EARLY  SEPTEMBER.
  4/81   SYSTEM

  5/81   SYSTEM

  6/81   SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
                                                    720

                                                    744

                                                    720
 7/81   SYSTEM

 8/81   SYSTEM

 9/81   SYSTEM
INITIAL SHAKEDOWN/DEBUGGING OPERATIONS CONTINUED THROUGH THE SECOND
QUARTER 1981.

                                                    744

                                                    744

                                                    720
                                             13-1176

-------
                                                  UTILITY F60 SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TENNESSEE VALLEY AUTHORITY:  WIDOWS CREEK 7 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                SOS  PART. HOURS HOURS  HOURS FACTOR


      ** PROBLEMS/SOLUTIONS/COMMENTS

                         ACCEPTANCE TESTING OF THE WIDOWS CREEK 7 FGD SYSTEM BEGAN IN MID-SEPTEMBER.

10/81 SYSTEM                                                                 744

11/81 SYSTEM                                                                 720

12/81 SYSTEM                                                                 744

      *» PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FOURTH QUARTER THE SYSTEM WAS IN THE START UP DEBUGGING PHASE
                         OF OPERATION.  THE ACCEPTANCE TEST WAS PERFORMED DURING THIS PERIOD.

                         THE HELIX ON THE TROMMEL SCREEN, WHICH IS LOCATED AT THE DISCHARGE END OF
                         THE BALL MILL, WAS INSTALLED DURING THE PERIOD.

 1/82 SYSTEM                                                                 744

 2/82 SYSTEM                                                                 672

 3/82 SYSTEM                                                                 744

      ** PROSLEMS/SOLUTIONS/COMMENTS

                         MINOR MODIFICATIONS TO THE PIPING AND SYSTEM CONTROL WERE MADE DURING THE
                         FIRST QUARTER OF 1982.  THE ENTIRE WIDOWS CREEK PLANT HAS SEEN LIMITED
                         OPERATION DUE TO LACK OF POWER DEMAND.

                         PRESENTLY, THE UTILITY IS GETTING A PERMIT TO CONDUCT FORCED OXIDATION
                         TESTS.  BOTH WET AND DRY GYPSUM STACKING WILL BE INVESTIGATED.

 4/82 SYSTEM                                                  .               720

 5/82 SYSTEM                                                                 744

 6/82 SYSTEM                                                                 720

      »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE SECOND QUARTER.  THE BOILER WAS OPERATED AT LOW  LOAD DURING
                         THIS PERIOD DUE TO A LACK OF POWER DEMAND.

 7/82 SYSTEM                                                                 744

 8/82 SYSTEM                                                                 744

 9/82 SYSTEM                                                                 720

10/82 SYSTEM                                                                 74<»

11/82 SYSTEM                                                                 72°

12/82 SYSTEM                                                                 7<*

 1/83 SYSTEM                                                                 7
-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER

TENNESSEE VALLEY AUTHORITY: WIDOWS CREEK 7  (CONT.)
	,	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION   X REMOVAL   PER   BOILER   FGD   CAP.
                                                                 502   PART.  HOURS HOURS  HOURS FACTOR


 5/83  SYSTEM                                                                 744

 6/83  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         SINCE JUNE  1982 THE WIDOWS CREEK 7  FGD  SYSTEM HAS  EXPERIENCED PLUGGING
                         PROBLEMS  IN THE MIST  ELIMINATORS.   ALTHOUGH  TVA HAS NOT ISOLATED AN
                         ULTIMATE  CAUSE IT  IS  SUSPECTED  THAT THE PROBLEM RESULTS FROM  AN UNDER-
                         DESIGNED  MIST ELIMINATOR  (WITH  RESPECT  TO GAS FLOW).

 7/83  SYSTEM                                                                 744

 8/83  SYSTEM                                                                 744

 9/83  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MIST  ELIMINATOR PLUGGING  PROBLEMS CONTINUED  DURING THE  THIRD  QUARTER OF
                         1983.

                         THE UTILITY REPORTED  A  SOLIDS BUILD-UP  PROBLEM IN  BOTH  THE  ABSORBER AND
                         VENTURI VESSELS DUE TO  A  POORLY OPERATING OVERFLOW SYSTEM.

                         PROBLEMS  WITH THE  REAGENT MIXING SYSTEM WERE REPORTED DURING  THE THIRD
                         QUARTER.  RADIAL TYPE MIXERS  WERE REPLACED WITH THE AXIAL TYPE.

 10/83  SYSTEM                                                                 744

 11/83  SYSTEM                                                                 720

 12/83  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED  THAT NO  MAJOR  FGD-RELATED PROBLEMS WERE  ENCOUNTERED
                         DURING THE  FOURTH  QUARTER OF  1983.

 1/84  SYSTEM                                                                 744

 2/84  SYSTEM                                                                 696

 3/84  SYSTEM                                                                 744

 4/84  SYSTEM                                                                 720

 5/84  SYSTEM                                                                 744

 6/84  SYSTEM                                                                 720

 7/84  SYSTEM                                                                 744

 8/84  SYSTEM                                                                 744

 9/84  SYSTEM                                                                 720

       ** FROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY EXPERIENCED CORROSION  PROBLEMS WITH THE REHEATER  CARBON STEEL
                         FIN TUBES AT  UNIT  7.  STAINLSS STEEL FIN TUBES ARE  BEING CONSIDERED FOR
                         REPLACEMENT.
                                             13-1178

-------
                                                  UTILITY FGD  SURVEY:  OCTOBER  1983  - SEPTEMBER  198*

TENNESSEE VALLEY AUTHORITY: WIDOWS  CREEK 7 (CONT.)
	PERFORMANCE DATA	
PERIOD  MODULE AVAILABILITY  OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD    CAP.
                                                                SOZ  PART.  HOURS HOURS  HOURS  FACTOR

                         THE UTILITY REPORTED THAT A FORCED OXIDATION SYSTEM WILL BE EMPLOYED  AT
                         WIDOWS CREEK 7 AND 8 FOR SLUDGE TREATMENT. A SPARGER NETWORK AT THE
                         BOTTOM OF THE THICKENER TANK WILL BE INSTALLED AND AN AGITATOR  WILL BE
                         UTILIZED FOR SOLID SUSPENSION.
                                             13-1179

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC F60 SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE  GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M
               (  .120 LB/MMBTU)
               ( 1.200 LB/MMBTU)
               (****** LB/MMBTU)
TENNESSEE VALLEY AUTHORITY
WIDOWS CREEK
8
STEVENSON
ALABAMA
C
   52.
  516.
******
*****
  550
  516
  542
  550
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
  764.48
  137.8
  152.
CONCRETE
*******        (***** FT)
               (1620000 ACFM)
               ( 280 F)
               ( 500 FT)
  ** FUEL  DATA
      FUEL TYPE
      FUEL GRADE
      AVERAGE HEAT  CONTENT  - J/G
      RANGE HEAT  CONTENT  -  BTU/LB
      AVERAGE ASH CONTENT - 7.
      RANGE ASH CONTENT - 7.
      AVERAGE MOISTURE CONTENT  - 7.
      RANGE MOISTURE  CONTENT -  7.
      AVERAGE SULFUR  CONTENT -  7.
      RANGE SULFUR  CONTENT  - 7.
      AVERAGE CHLORIDE CONTENT  - 7.
      RANGE CHLORIDE  CONTENT -  7.

 *** PARTICLE CONTROL

  ** MECHANICAL COLLECTOR
      NUMBER
      TYPE

  ** PARTICLE SCRUBBER
      NUMBER
      NUMBER OF SPARES
      INITIAL START-UP DATE
      GENERIC TYPE
      SPECIFIC TYPE
      TRADE NAME/COMMON NAME
      SUPPLIER
      DIMENSIONS  -  FT
      SHELL GENERIC MATERIAL
      SHELL SPECIFIC  MATERIAL
      LINER GENERIC MATERIAL
      LINER SPECIFIC  MATERIAL
      GAS  CONTACTING  DEVICE TYPE
      NUMBER OF CONTACTING  ZONES
      LIQUID RECIRCULATION  RATE - LITER/S
      L/G  RATIO - LITER/CU.M
      PH CONTROL  ADDITIVE
      PRESSURE DROP - KPA
      INLET GAS FLOW  RATE - CU.M/S
      INLET GAS TEMPERATURE - C
      S02  REMOVAL EFFICENCY - 7.
      PARTICLE REMOVAL EFFICIENCY -  7.
COAL
BITUMINOUS
27470.         C  11810 BTU/LB)
                11360-12330
   11.70
9.2-12.7
    7.70
5.1-9.5
    3.30
1.3-3.8
     .07
******
 0
NONE
 4
 0
 5/77
VENTURI TOWER
VARIABLE-THROAT/SIDE-MOVABLE BLADES
N/A
TVA/POLYCON
23.0 X 28.0
CARBON STEEL
HIGH STRENGTH LOW ALLOY IHSLA1
STAINLESS STEEL; INORGANIC [IN CONVERGENT SECTIO
AUSTENITIC; SILICON CARBIDE
VENTURI THROAT
 1
               ( 3380 GPM)
               ( 8.3 GAL/1000ACF)
  212.9
    1.1
LIMESTONE
    2.5
  191.1
  137.8
   10.0
   98.5
               (10.0 IN-H20)
               ( 405000 ACFM)
               (  280 F)
                                             13-1180

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
TENNESSEE VALLEY AUTHORITY: WIDOWS CREEK 8 (CONT.)
*«* FGD SYSTEM

 ** GENERAL DATA
     SALEABLE FRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     OPER. & MAINT. REQUIREMENT - MANHR/DAY

 ** QUENCHER/PRESATURATOR
     NUM3ER

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUFERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     SOZ REMOVAL EFFICIENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     FREEBOARD DISTANCE - M
     DISTANCE BETWEEN VANES - CM
     PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     HASH WATER SOURCE
     WASH FREQUENCY
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIMESTONE
 NONE
 TENNESSEE VALLEY AUTHORITY
 NONE
 FULL SCALE
 RETROFIT
X   98.50
    80.00
     4.7
  1
  1/78
  5/77
  2/73
    56.0
  4
  0
 PACKED TOWER
 GRID PACKING
 N/A
 POLYGON
 30.0 X 16.0 X 34.0
 CARBON STEEL; STAINLESS STEEL
 HIGH STRENGTH LOW ALLOY (HSLA1; AUSTENITIC
 COR-TEN; TYPE 316L
 ORGANIC
 SYNTHETIC RUBBER
 NEOPRENE LS-576
 FIXED GRIDS
  5
  1310.         (20800 GPM)
     8
       0
      .5
     2.3
   163.61
    51.7
    70.0
(60.0 GAL/1000 ACF)
(  2.0 IN-H20)
(   7.5 FT/S)
(  346700 ACFM)
(   125 F)
 PRIMARY COLLECTOR
  4
  0
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 VERTICAL
     1
     4
     4.27
     3.8
      .2
     2.7
 STAINLESS STEEL
 AUSTENITIC
 RIVER WATER
 CONTINUOUS
(14.0 FT)
  1.50 IN)
  1.0 IN-H20)
   9.0 FT/S)
                                            13-1181

-------
UTILITY F60 SURVEY: OCTOBER 1983 - SEPTEMBER

TENNESSEE VALLEY AUTHORITY: WIDOWS CREEK 8 (CONT.)
 *» REHEATER
     NUMBER
     NUMBER OF SPARES
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     TEMPERATURE INCREASE - C
     INLET FLUE GAS TEMPERATURE - C
     OUTLET FLUE GAS TEMPERATURE - C
     NUMBER OF HEAT EXCHANGER BANKS
     NUMBER OF TUBES PER BUNDLE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 «* FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     GENERIC TYPE
     SPECIFIC TYPE
     MODULATION
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     GENERIC TYPE
     SPECIFIC TYPE
     MODULATION
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     GENERIC TYPE
     SPECIFIC TYPE
     MODULATION
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTKORK
     LOCATION
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE
 0
 1
INDIRECT HOT AIR
EXTERNAL HEAT EXCHANGER
STEAM TUBE BUNDLE
   27.8        (   50 F)
   51.7        (  125 F)
   79.4        (  175 F)
  20
  80
CARBON STEEL; COPPER CFINSI
AISI 1110
 4
 0
CENTRIFUGAL
GREEN FUEL ECONOMIZER
UNIT
FORCED DRAFT
DRY
  191.12
  137.8
    9.8
CARBON STEEL
 (  405000 ACFM)
 (   280 F)
 (32.0 IN-H20)
HIGH ALLOY (BLADE WEAR PLATES!
GUILLOTINE
BOTTOM-ENTRY GUILLOTINE
OPEN [INOPERATIVE]
CARBON STEEL/HIGH ALLOY
HIGH STRENGTH LOW ALLOY tHSLAl; NICKEL BASE/CHRO
NONE
N/A
GUILLOTINE
BOTTOM-ENTRY GUILLOTINE
OPEN [INOPERATIVE]
CARBON STEEL/HIGH ALLOY
HIGH STRENGTH LOW ALLOY [HSLA1; NICKEL BASE/CHRO
NONE
N/A
GUILLOTINE
BOTTOM-ENTRY GUILLOTINE
CLOSED [INOPERATIVE!
CARBON STEEL/HIGH ALLOY
HIGH STRENGTH LOW ALLOY [HSLAJ; NICKEL BASE/CHRO
NONE
N/A
INLET
CARBON STEEL
HIGH STRENGTH LOW ALLOY  [HSLAJ
NONE
N/A
OUTLET
STAINLESS STEEL
AUSTENITIC
NONE
N/A
                                             13-1182

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
TENNESSEE VALLEY AUTHORITY: WIDOWS CREEK 8 (CONT.)
 »* REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER
     NUMBER OF SPARES
     FULL LOAD DRY FEED CAPACITY - M.TONS/HR
     PRODUCT QUALITY - X SOLIDS

 ** TANKS
     SERVICE
     ABSORBER RECYCLE
     SCRUBBER RECYCLE
     REAGENT PREP PRODUCT
     WASTE SLURRY BLEED
     REHEATER DRAIN

 *« PUMPS
     SERVICE
     ABSO?EER RECIRCULATION
     POND RETURN
     RIVER WATER TRANSFER
     VENTURI RECIRCULATION

  «« SOLIDS CONCENTRATING/DEWATERING
     DEVICE

 *** SLUDGE

  ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

  »* DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT
     SITE DIMENSIONS
     SITE CAPACITY - CU.M
     SITE SERVICE LIFE - YRS

  *« PROCESS CONTROL AND INSTRUMENTATION
     PROCESS STREAM
     CHEMICAL PARAMETERS
     PHYSICAL VARIABLES
     CONTROL LEVELS
     MONITOR LOCATION

  ** WATER BALANCE
     WATER LOOP TYPE

  ** CHEMICALS AND CONSUMPTION
     FUNCTION
     NAME
     PRINCIPAL CONSTITUENT
     UTILIZATION - X
     POINT OF ADDITION

  ** FGD SPARE CAPACITY INDICES
     ABSORBER - X
     BALL MILL - X
WET BALL MILL
COMPARTMENTED
NR
KENNEDY VAN SAUN
 1
 0
   36.3        (  40 TPH)
   40.0
                                                NUMBER
   4
   4
   1
   1
**«*
NUMBER

  10
****
**»*
   6
NONE
FORCED OXIDATION
N/A
N/A
FINAL
POND
ON-SITE
PIPELINE
CLAY LINING
110 ACRES X
   4035900
  5
30 FT DEEP
   (   3300.0 ACRE-FT)
INLET TO ABSORBER
PH
PERCENT SOLIDS,  PRESSURE DROP,  S03
PH SET AT 5.9, 10X SOLIDS  IN  ABSORBER
PH-ABSORBER RECYCLE  LINE
CLOSED
ABSORBENT
LIMESTONE
CAC03
   65.0
BALL MILL
      .0
      .0
                                             13-1183

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

TENNESSEE VALLEY AUTHORITY: WIDOWS CREEK 8 (CONT.)
 ** FGD SPARE COMPONENT INDICES
     ABSORBER                                        .0
     BALL MILL                                       .0
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 5/77  SYSTEM       1.5         2.6                     1.5                  744   426     11  40.9

       #*  PROBLEMS/SOLUTIONS/COMMENTS

                         STARTUP AND SHAKEDOWN PROCEDURES OFFICIALLY BEGAN ON APRIL 30, 1977.
                         SCRUBBING OPERATIONS BEGAN ON MAY 16 WHEN FLUE GAS WAS PASSED THROUGH A
                         AND B TRAINS.

 6/77  SYSTEM      10.9        18.0                    10.9                  720   438     79  36.3

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         C AND D TRAINS WERE STILL UNDERGOING PRESCRUBBING PREPARATIONS THROUGH
                         JUNE.  BECAUSE OF BOILER RELATED PROBLEMS SUFFICIENT STEAM WAS NOT AVAIL-
                         ABLE TO OPERATE THE FLUE GAS REHEATERS.

 7/77  SYSTEM      24.7        28.1                    24.7                  744   654    184  49.6

 8/77  A          20.0        22.8                    20.0
       B          40.0        45.7                    40.0
       C          36.7        42.0                    36.7
       D           8.3         9.5                     8.3
       SYSTEM      26.3        30.0                    26.3                  744   651    195  47.5

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         27 SEPARATE INSTRUMENTATION FAILURES OCCURRED DURING THE PERIOD.  THE
                         PROBLEMS WERE ASSOCIATED WITH FLOW METERS, VARIABLE-SPEED CONTROLS, S02
                         MONITORS, PH MONITORS, AND SOLIDS MONITORS.  AUTOMATIC SCRUBBER CONTROLS
                         WERE INOPERATIVE.  SCRUBBING OPERATIONS HAVE BEEN CONDUCTED MANUALLY BASED
                         ON PERIODIC SAMPLING.

                         MAJOR PROBLEMS HAVE BEEN ASSOCIATED WITH THE GUILLOTINE BYPASS AND DOUBLE
                         LOUVER SEAL-OFF GAS DAMPERS.  S02 REACTS WITH RUBBER SEALS.  DETERIORATION
                         RESULTS IN S02 AND FLYASH LEAKING.  SUBSEQUENT FAILURE OF THE AUTOMATIC
                         GEAR BOXES NECESSITATES MANUAL DAMPER OPERATIONS.  IT HAS NOT BEEN POSSIBLE
                         TO ENTIRELY ISOLATE MODULES FOR REPAIR WORK BECAUSE OF THIS LEAKAGE.

                         LOW ESP PARTICULATE REMOVAL EFFICIENCY HAS RESULTED IN HIGH FAN ROTOR
                         EROSION, MOTOR BURNOUTS AND LUBRICATION PROBLEMS.

                         THERE WAS EVIDENCE OF SCALE ACCUMULATION IN THE SCRUBBING SYSTEM, HOWEVER,
                         THIS WAS NOT SEVERE.

                         EROSION HAS OCCURRED IN THE CERAMIC VENTURI THROAT LININGS.  THIS IS ALSO
                         A RESULT OF THE POOR ESP EFFICIENCY.

                         RUBBER LINING FAILURES HAVE OCCURRED IN THE VENTURIS, ABSORBERS AND TANKS.
                         IT IS BELIEVED THAT THESE WERE APPLICATION-RELATED FAILURES.  THE RUSBER
                         IN THE ABSORBER SECTION OF ALL FOUR TRAINS HAS DETACHED  IN VARIOUS PLACES.
                         THE SUPPLIER HAS REPAIRED THE DEFECTIVE SECTIONS.

                         SOFT SCALE FORMATION MAY RESULT FROM IMPROPER STOICHIOMETRIC RATIOS.
                         STOICHIOMETRIC RATIOS OF 2.0, 3.0 AND 6.0 HAVE OCCURRED  PERIODICALLY
                         BECAUSE OF MANUAL CONTROL AND OPERATOR JUDGEMENTS.  IDEALLY THE RATIO
                         SHOULD FALL IN THE 1.4 TO 1.6 RANGE.

                         THE BALL MILL HAS NOT BEEN ABLE TO OPERATE AT DESIGN CAPACITY.  THE BALL
                         MILL HAS A DESIGN CAPACITY OF GRINDING 50 TPH BUT HAS ONLY BEEN ABLE TO
                                             13-1184

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER
TENNESSEE VALLEY AUTHORITY: WIDOWS CREEK 8 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                                         X REMOVAL
                                                         S02  PART.
                                                         PER  BOILER  FGD   CAP.
                                                        HOURS HOURS  HOURS FACTOR
                         PRODUCE 35 TPH OF LIMESTONE SLURRY.
 9/77
A
B
C
D
SYSTEM
33.3
72.7
97.*
98.4
75.5
21.
68.
97,
98.
71,
                                                       17.8
                                                       57.8
                                                       82.1
                                                       83.1
                                                       60.2
                                                                      720   609
                                                                       433  45.5
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          DURING THIS MONTH THE BOILER WAS OPERATED AT A REDUCED LOAD OF ABOUT
                          300 MW.  AT THIS REDUCED LOAD. ONLY 3 TRAINS WERE REQUIRED TO HANDLE
                          ALL OF THE BOILER FLUE GAS.

                          SCME SCALING WAS DISCOVERED IN THE ABSORBER COLUMN AND ENTRAINMENT
                          SEPARATOR OUTLET OF ONE TRAIN.

                          SERIOUS EROSION PROBLEMS CONTINUE WITH THE ID FAN ROTORS.

                          THE UNIT WENT OFF LINE SEPTEMBER 30 FOR A SCHEDULED OUTAGE TO REPAIR BOIL-
                          ER TUBES.  DURING THE OUTAGE, AN ATTEMPT WILL BE MADE TO CORRECT MANY OF
                          THE MECHANICAL PROBLEMS.
 10/77  SYSTEM
           100.0
                                      .0
                                                                      744
                                                                                          .0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          UNIT 8 WAS OFF-LINE FOR THE ENTIRE MONTH DURING A SCHEDULED OUTAGE FOR
                          REPAIR OF BOILER TUBES.  DURING THIS PERIOD, MANY MECHANICAL AND INSTRU- -
                          MENTAL SCRUBBER PROBLEMS WERE CORRECTED.
 11/77  A
       B
       C
       D
       SYSTEM
            57.0
                        85.5
                        89.8
                        99.8
                        75.8
                        87.7
                                    49.0
                                    51.5
                                    57.2
                                    43.5
                                    50.3
                                              720   413
                                                           362  38.8
       «* PROBLEMS/SOLUTIONS/COMMENTS
                          THE UNIT WAS BROUGHT BACK IN SERVICE ON NOVEMBER 11 FOLLOWING THE SCHED-
                          ULED BOILER OUTAGE (AVAILABILITY WAS CALCUATED FROM NOVEMBER 11 THROUGH
                          NOVEMBER 30).

                          ALL ID FANS HAVE BEEN REBUILT IN AN ATTEMPT TO CORRECT THE CORROSION AND
                          DRIVE MOTOR PROBLEMS.

                          GAS LEAKAGE FROM THE DAMPERS WAS CORRECTED BY WELDING A COVER PLATE OVER
                          THE SEAL DOORS.  THE SUPPLIER IS CURRENTLY WORKING ON A NEW DESIGN FOR
                          DAMPERS.

                          INSTRUMENTATION PROBLEMS CONTINUE TO HAMPER PROPER SCRUBBER OPERATION.
 12/77  A
       B
       C
       0
       SYSTEM
            59.3
            55.9
            58.7
            57.7
            57.9
            98.1
            97.9
            97.2
            95.4
            97.2
                        56.1
                        56.0
                        55.6
                        54.6
                        56.0
744   426
414  42.9
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          THE UNIT WAS OFF-LINE FROM DECEMBER 20 TO DECEMBER  31  FOR REPAIRS  OF A
                          BOILER TUBE LEAK.

                          DURING THE BOILER OUTAGE, AN  INSPECTION WAS MADE OF THE  SCRUBBER MODULES.
                                             13-1185

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER

TENNESSEE VALLEY AUTHORITY: WIDOWS CREEK 8 (CONT.)
	...	,	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR


1/78 A
B
C
0
SYSTEM


90.2
86.7
64.6
83.8
87.6
THE RUBBER
MODULES AND
98.5
94.5
91.9
97.0
95.5
LINER WAS FOUND TO BE MISSING IN SEVERAL AREAS OF
WAS REPAIRED DURING THE OUTAGE.
81.9
78.5
76.4
60.6
79.4 744 618
ALL FOUR





590 60.1
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          ALL FOUR SCRUBBER MODULES RETURNED TO SERVICE THIS MONTH FOLLOWING REPAIR
                          WORK ON THE RUBBER  LINER DURING THE RECENT BOILER OUTAGE.

                          MINOR  PROBLEMS WERE ENCOUNTERED WITH FREEZING AND BURSTING OF PIPING.

                          FEED HOPPERS AT THE LIMESTONE STORAGE AREA HAVE BEEN PLUGGING DUE TO FROZ-
                          EN GRAVEL.

                          THE BALL MILL SUMP  PUMP LINERS HAVE BEEN WEARING OUT.

                          SOME PLUGGING OF THE VENTURI SPRAY NOZZLES WAS ENCOUNTERED DURING
                          JANUARY.

                          INSTRUMENTATION CONTINUES TO BE A MAJOR PROBLEM WITH OPERATION OF THE
                          SCRUBBER.
  2/78  A
        B
        C
        D
        SYSTEM
25.5
69.4
67.8
56.5
54.8
29.3
68.4
63.1
53.6
53.6
25.5
59.7
55.1
46.6
46.8
                                                                             672   586
                                                                                           314  49.7
        *« PROBLEMS/SOLUTIONS/COMMENTS
                           THE  OUTAGE  TIME  FOR  TRAINS A AND B WAS REQUIRED TO REPLACE THE RUBBER
                           LINERS  IN THE  DOWNCOMER AREA WITH STAINLESS STEEL.  C AND D TRAINS WILL
                           WILL RECEIVE THE SAME MODIFICATION.
  3/78  A
        B
        C
        D
        SYSTEM
81.9
48.4
26.8
81.6
59.7
90.8
53.4
30.9
90.5
66.4
78.6
46.2
26.8
78.3
57.5
                                                                              744    644
                                                                       428  43.7
        «* PROBLEMS/SOLUTIONS/COMMENTS
                           TRAIN B  WAS OUT  OF  SERVICE  MARCH  1  THROUGH  MARCH  13  TO  INSTALL STAINLESS
                           STEEL IN THE ABSORBER  AND VENTURI DOKNCOMER AREAS.

                           STAINLESS STEEL  COVERS WERE INSTALLED  AROUND  TWO  EXPANSION  JOINTS ON  TRAIN
                           C IN ORDER TO PREVENT  FLUE  GAS  LEAKAGE.

                           A STAINLESS STEEL PLATE WAS WELDED  OVER  THE ENTRY DOOR  OPENINGS TO TRAIN C
                           OUTLET AND BYPASS GUILLOTINE DAMPERS FOR THE  PURPOSE OF ELIMINATING GAS
                           LEAKAGE.

                           TRAIN C  WAS OUT  OF  SERVICE  MARCH  14 THROUGH MARCH 29 TO INSTALL STAINLESS
                           STEEL ABSORBER AND  VENTURI  DOWNCOMER AREAS.

                           SEVERAL  LIFTER BARS ON THE  FEED AND DISCHARGE ENDS OF THE BALL MILL WERE
                           FOUND TO BE BADLY WORN.

                           THE UTILITY HAS  HAD WEAR PROBLEMS WITH THE  SLURRY SUMP  PUMP LINERS AT THE
                                             13-1186

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER 198*
TENNESSEE  VALLEY AUTHORITY:  WIDOWS CREEK 8 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR
 4/78
A
B
C
D
SYSTEM
80.0
67.7
90.0
38.1
69.0
BALL MILL.

     88.8
     85.8
    100.0
     50.8
     81.4
                                                       66.6
                                                       64.4
                                                       80.0
                                                       38.1
                                                       62.3
                                                                      720   540
                                                                       448  44.4
       ** PROBLEMS/SOLUTIONS/COMMENTS
                          DURING A BRIEF INSPECTION OF THE SCRUBBING SYSTEM IN EARLY APRIL,  SOLIDS
                          DEPOSITION WAS NOTICED IN THE MIST ELIMINATOR SECTION OF ALL TRAINS DUE  TO
                          PLUGGING THAT HAD OCCURRED IN SEVERAL OF THE MIST ELIMINATOR SPRAY NOZZLES
                          TRAIN D WAS OUT OF SERVICE FOR 17 DAYS WHILE THE MIST ELIMINATOR WAS
                          DISASSEMBLED AND CLEANED.

                          A STAINLESS STEEL LINER WAS INSTALLED ON THE SLOPING SECTIONS OF THE
                          ABSORBER AND VENTURI OF TRAIN D.

                          STAINLESS STEEL PLATES WERE INSTALLED OVER THE ENTRY DOOR OPENINGS TO
                          TRAIN 0 INLET, OUTLET AND BYPASS GUILLOTINE DAMPERS TO REDUCE GAS  LEAKAGE

                          STAINLESS STEEL COVERS WERE INSTALLED AROUND THE FIVE EXPANSION JOINTS ON
                          TRAIN D, TWO EXPANSION JOINTS ON TRAIN A, AND ONE EXPANSION JOINT  ON TRAIN
                          B TO REDUCE GAS LEAKAGE.

                          THERE CONTINUES TO BE A WEAR PROBLEM WITH PUMP LINERS AT THE BALL  MILL.
                          NO CAUSE OR SOLUTION OF THE PROBLEM HAS BEEN ASCERTAINED AS YET.
  5/78
A
B
C
D
SYSTEM
                   97.2
            52.0
           100.0
           100.0
           100.0
            88.0
                             34.0
                             68.7
                             69.9
                             66.1
                             59.7
                                                                             744   486
444  44.4
       »* PROBLEMS/SOLUTIONS/COMMENTS
                         BEGINNING MAY 1978 AVAILABILITY CALCULATIONS EXCLUDED UNAVAILABLE HOURS
                         RESULTING FROM THE ID FAN SINCE THE ID FAN IS INTENDED PRIMARILY FOR
                         MAINTAINING BOILER FURNACE DRAFT.  FGD SYSTEM AVAILABILITY CALCULATORS DO
                         INCLUDE UNAVAILABLE HOURS RESULTING FROM THE LIMESTONE PREPARATION
                         FACILITY.

                         ON MAY 29 A SMALL PERFORATION IN THE RIVERSIDE VERTICAL WALL OF THE ABSOR-
                         BER VESSEL WAS DISCOVERED (LEAKING SLURRY). FURTHER EXAMINATION SHOWED THAT
                         A STRIP OF LOOSE NEOFRENE HAD ALLOWED SLURRY TO CORRODE AND/OR ERODE THE
                         BARE CARBON STEEL VESSEL. BECAUSE OF THE SMALL SIZE OF THE LEAK, NO ATTEMPT
                         WILL BE MADE TO PROVIDE A PERMANENT PATCH UNTIL THE NEXT EXTENDED OUTAGE ON
                         TRAIN A.  THERE WAS NO EVIDENCE OF ANY CORROSIVE OR EROSIVE ATTACK ON THE
                         NEWLY-APPLIED STAINLESS STEEL ON THE SLOPING PORTIONS OF THE VESSEL.
  6/78
       A
       B
       C
       D
       SYSTEM
                        100.0
                        100.0
                        100.0
                        100.0
            91.7
           100.0
                                    70.1
                                    73.8
                                    71.7
                                    70.7
                                    71.6
                                                                      720   472
                                                                518   39.8
       *» FROBLEMS/SOLUTIONS/COMMENTS
                         SEVERE FAILURE OF THE BALL MILL OUTBOARD FLANGED FOURNAL BOLTS RESULTED
                         IN A LOSS OF SLURRY PRODUCTION SEVERAL TIMES DURING JUNE.
  7/78  A
                        96.9
                                                       75.3
                                            13-1187

-------
UTILITY FED SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TENNESSEE VALLEY AUTHORITY: WIDOWS CREEK 8 (CONT.)
_	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                SOZ  PART. HOURS HOURS  HOURS FACTOR
B
C
D
SYSTEM


91


.7
98
90
100
96
.8
.7
.0
.6
76.
70.
88.
77.
7
4
8
8


744 578


579


53.


0
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE BUCKET ELEVATOR SUPPLYING LIMESTONE TO THE BALL MILL FAILED ON JULY 21.
                         APPARENTLY, THE CHAIN CARRYING THE BUCKETS GOT OFF TRACK DAMAGING SEVERAL
                         BUCKETS BEFORE THE CONDITION WAS DISCOVERED.  REPAIRS WERE NOT COMPLETED
                         UNTIL JULY 24.

                         BECAUSE OF THE NECESSITY FOR KEEPING UNIT 8 ON-LINE, THE SCRUBBER WAS RUN
                         WITHOUT LIMESTONE ADDITIONCTHERE IS AN APPROXIMATE 8-HOUR RESERVE OF GROUND
                         LIMESTONE WHEN THE SLURRY STORAGE TANK IS FULL).

                         SINCE THERE IS NO RESERVE BUCKET ELEVATOR, AN OPENING WAS CUT IN THE TOP
                         OF THE BALL MILL FEED HOPPER AND A CHUTE WAS INSTALLED EXTENDING OUTWARD
                         FROM THE OPENING TO ALLOW LOADING A LIMESTONE INTO THE BALL MILL FEED
                         HOPPER USING A CRANE WITH A CLAMSHELL LOADER.  THIS WILL ALLOW CONTINUED
                         OPERATION OF THE BALL MILL IN THE EVENT OF FUTURE BUCKET ELEVATOR FAILURES.
 8/78
       A
       B
       C
       D
       SYSTEM
91.4
100.0
 56.9
 53.6
 95.6
 77.8
87.8
49.2
50.7
82.7
67.6
                                                                             744   643
                                                                                          503  44.6
       *#  PROBLEMS/SOLUTIONS/COMMENTS
                         ABSORBER SPRAY NOZZLE CONES CONTINUE TO DROP TO THE TOP GRID, DISTORTING
                         SPRAY PATTERNS.  INSPECTIONS ON AUGUST 18 SHOWED CONSIDERABLE TOP GRID
                         WEAR OF THE 316 STAINLESS STEEL GRIDS, PROBABLY AGGRAVATED BY LOSS OF
                         NOZZLE CONES.  FOUR SPRAYCO 1969F 5-INCH ORIFICE NOZZLES WERE BORROWED FROM
                         THE SHAWNEE STEAM PLANT TEST FACILITY AND INSTALLED IN ABSORBER B ON AUGUST
                         18 FOR EVALUATION AS POSSIBLE CANDIDATES FOR REPLACING NOZZLES IN CURRENT
                         USE.  THESE SPRAYCO NOZZLES HAVE SUBSTANTIAL INTERNAL DEFLECTORS AND ARE
                         EXPECTED TO DEMONSTRATE IMPROVED PERFORMANCE.

                         SPRAYING SYSTEMS COMPANY WILL ALSO LEND FOUR OF THEIR 5-INCH SCRUBBER NOZ-
                         ZLES FOR TESTING.  THESE ARE EXPECTED TO ARRIVE IN SEPTEMBER.
  9/78
        A
        B
        C
        D
        SYSTEM
98.7
100.0
100.0
 29.0
 83.9
 78.2
76.1
82.9
20.6
59.4
59.8
                                                                             720   510
                                                                       430  39.5
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         REPAIRS ON THE BUCKET ELEVATOR WERE COMPLETED ON SEPTEMBER 24.
 10/78
        A
        B
        C
        D
        SYSTEM
22.4
           100.0
           100.0
           100.0
              .0
              ,0
            75
                         23.0
                         19.9
                         22.2
                           .0
                         16.3
                                                                             744    146
                                                                       121  10.1
       **  PROBLEMS/SOLUTIONS/COMMENTS
                         THE  LIMESTONE BUCKET ELEVATOR  FAILED ON OCTOBER 4.  THE  ELEVATOR HAD BEEN
                         LAST REPAIRED ON SEPTEMBER 24.  THE BUCKET ELEVATOR FAILURES ARE CAUSED
                         BY THE DRIVE SPROCKETS BECOMING LOOSE ALLOWING THE CHAINS  TO WORK OFF OF
                         THE  SPROCKET AND THE HOUSING NOT BEING PLUMB.
                                             13-1188

-------
                                                  UTILITY FGO SURVEY:  OCTOBER  1983 -  SEPTEMBER  1984
TENNESSEE VALLEY  AUTHORITY:  WIDOWS CREEK 8 (CONT.)
	PERFORMANCE DATA	
PERIOD  MODULE  AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD    CAP.
                                                                S02  PART.  HOURS HOURS  HOURS  FACTOR

                         SHORT-TERM PLANS ARE TO REBUILD THE BUCKET ELEVATOR DURING THE  SCHEDULED
                         BOILER OUTAGE.  THE LONG-TERM SOLUTION IS TO REPLACE THE BUCKET ELEVATOR
                         WITH CONVEYORS.
11/78  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
                                                  .0
                                                                      720
                                                                        .0
                         THE UNIT WAS DOWN FOR A SCHEDULED SCRUBBER/BOILER OUTAGE  IN NOVEMBER.

                         A FIRE ON NOVEMBER 28 IN TRAIN A ABSORBER CAUSED  BY WELDING DESTROYED  THE
                         TURBULENT CONTACT ABSORBER (TCA) SPHERES INSTALLED DURING THE  PRESENT
                         OUTAGE.
12/78
A
B
C
D
SYSTEM
                   67.7
        .0
     100.0
     100.0
     100.0
      75.0
  .0
15.2
11.8
15.3
10.6
                                                                             744
                                                                             37
                                                                                           79
       ** PROBLEMS/SOLUTIONS/COMMENTS
  1/79  SYSTEM
            75.0
CLEANUP OF THE FIRE-DAMAGED TRAIN A ABSORBER WAS COMPLETED ON DECEMBER  5.

THE BUCKET ELEVATOR REPAIRS CONTINUED IN DECEMBER.  A PORTABLE CONVEYOR
IS BEING USED TO SUPPLY LIMESTONE UNTIL THE BUCKET ELEVATOR REPAIRS ARE
COMPLETE.

                                .0
       *« PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT REMAINED OUT OF SERVICE BECAUSE OF TURBINE ROTOR PROBLEMS.

                         FOLLOWING THE NOVEMBER 28 FIRE, THE DECISION WAS MADE NOT TO RESTORE THE
                         DAMAGED NEOPRENE ABSORBER VESSEL LINING, BUT TO REPLACE IT WITH 316L STAIN-
                         LESS STEEL.  TWO PRINCIPAL REASONS FOR NOT RESTORING THE RUBBER WERE HIGH
                         COST AND A STATEMENT BY THE RUBBER APPLICATOR THAT HE COULD NOT GUARANTEE
                         ANY RUBBER APPLIED TO THE VESSELS WITH THE AMBIENT TEMPERATURE BELOW ABOUT
                         55 F.  STAINLESS STEEL (TYPE 316L) IS CHEAPER (APPLIED COST) THAN RUBBER
                         QUICKER TO APPLY, AND HAS BEEN DEMONSTRATED AT WIDOWS CREEK STEAM PLANT TO
                         BE VERY DURABLE FOR APPLICATION WITHIN THE ABSORBER VESSEL.

                         AN ESTIMATED 4,200 SQUARE FEET OF DAMAGED RUBBER WAS REMOVED AND 3/16-INCH-
                         THICK 316L STAINLESS STEEL WAS PURCHASED FOR REPLACEMENT.  THIS ARRIVED AT
                         THE PLANT ON JANUARY 16.  PREPARATION OF THE ABSORBER VESSEL INTERIOR FOR
                         INSTALLATION OF THE STAINLESS STEEL CONTINUED DURING JANUARY.  SINCE TRAIN
                         A ABSORBER STAINLESS STEEL GRID (DIRECTLY BELOW THE SPRAY NOZZLES) WAS
                         DESTROYED BY THE FIRE, THE LOWER STAINLESS STEEL GRID FROM TRAIN B WAS
                         REMOVED AND INSTALLED AS THE TOP GRID IN TRAIN A.  A NEW COMPLEMENT OF
                         FIBERGLASS-REINFORCED PLASTIC (FRP) ABSORBER VESSEL GRIDS WAS ORDERED AND
                         WAS SCHEDULED TO ARRIVE ONSITE DURING FEBRUARY.
  2/79
       A
       B
       C
       D
       SYSTEM
            66.4
                          .0
                       100.0
                       100.0
                       100.0
                        75.0
                                .0
                              70.5
                              68.6
                              52.4
                              47.9
                      672   314
323  25.6
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         TRAIN D BECAME AVAILABLE FEBRUARY 10 FOR THE INSTALLATION OF FORCED-
                         OXIDATION TEST EQUIPMENT.  BY FEBRUARY 10, INSTALLATION WAS COMPLETED ON
                         PUMPS, TANKS, VACUUM FILTERS, AND MODIFICATION OF THE ABSORBER AND VENTURI
                                            13-1189

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TENNESSEE VALLEY AUTHORITY: WIDOWS CREEK 8 (CONT.)
_	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                              X REMOVAL   PER  BOILER  FGD   CAP.
                                              S02  PART.  HOURS HOURS  HOURS FACTOR
                         AGITATOR CONTROL CIRCUITS.  BY LATE FEBRUARY, ERECTION OF THE ELECTRICAL/
                         CONTROL BUILDING AND INSTALLATION OF FLOCCULENT PIPING WAS BEGUN.  CON-
                         STRUCTION OF THE FACILITY IS EXPECTED TO BE COMPLETED IN MARCH.

                         NEU AGITATORS WERE INSTALLED ON THE TRAIN D ABSORBER AND VENTURI CIRCULA-
                         TION TANKS.  THE NEW, MORE POWERFUL AGITATORS ARE NEEDED FOR THE FORCED-
                         OXIDATION TESTS.
 3/79  A
       B
       C
       0
       SYSTEM
                   99.6
             78.6
            100.0
            100.0
            100.0
             94.7
                         69.6
                         93.0
                         92.7
                         91.7
                         86.8
                            659
                                   646  62.1
       «*  PROBLEMS/SOLUTIONS/COKMENTS
                         REPAIRS OF DAMAGE RESULTING FROM THE FIRE IN TRAIN A LAST NOVEMBER WERE
                         COMPLETED BY MARCH 1, 1979.  TRAIN A REMAINED OUT OF SERVICE UNTIL MARCH 8
                         TO REBUILD THE INDUCED-DRAFT FAN-A FLUID DRIVE.

                         BECAUSE THE REPLACEMENT FIBERGLASS-REINFORCED PLASTIC (FRP) GRATING DID
                         NOT ARRIVE AT THE PLANT BY MARCH 1, 1979, ORDINARY CARBON STEEL FLOOR
                         GRATING WAS INSTALLED FOR THE MARCH 8 STARTUP.  INSPECTIONS LATE IN MARCH
                         REVEALED THAT CORROSION AND EROSION HAD DESTROYED APPROXIMATELY 70-80X
                         OF THE CARBON STEEL GRATING.
  4/79
        A
        B
        C
        D
        SYSTEM
                    96.4
            100.0
            100.0
            100.0
            100.0
            100.0
                         85.0
                         77.9
                         75.8
                         81.5
                         80.1
                                                                             720   519
                                                                                          577  46.8
        **  PROBLEMS/SOLUTIONS/COMMENTS
                          FOLLOWING THE BALLMILL TEST ON MARCH 21, 1979, WHERE SLURRY BEGAN TO OVER-
                          FLOW OUT THE FEED END OF THE MILL, THE CLASSIFIERS WERE EXAMINED FOR POS-
                          SIBLE  PLUGGING.  ONE CLASSIFIER  LINER WAS WORN, AND THE CYCLONE INLET PIPE
                          WAS PARTIALLY PLUGGED WITH SLURRY.  REPAIRS WERE MADE, AND THE BALL MILL
                          RESUMED OPERATION WITH NO OVERFLOW PROBLEMS.  WHEN THE CYCLONE LINERS ARE
                          WORN OR THE CYCLONES ARE PARTIALLY PLUGGED, TOO MUCH MATERIAL IS RETURNED
                          TO THE MILL CAUSING OVERFLOW OF  SLURRY OUT THE FED END OF THE MILL.
  5/79
        A
        B
        C
        D
        SYSTEM
100.0
100.0
100.0
100.0
100.0
 97.5
 59.3
100.0
100.0
 89.2
83.6
50.8
89.7
87.9
78.0
                                                                             744   638
                                                                                          580  54.9
        ** PROBLEMS/SOLUTIONS/COMMENTS
6/79 A
B
C
D
SYSTEM
100.0
100.0
100.0
99.6
99.9
93.6
89.9
91.1
93.8
92.1
                          THE  VENTURI  HEADERS AND NOZZLES HAVE  PLUGGED WITH SCALE  AND  SOLIDS.  A NEW
                          VENTURI  HEADER  HAS BEEN INSTALLED  AND IS BEING TESTED ON TRAIN  B.  THE
                          NEW  HEADER CONSISTS OF SIX  5-INCH  FULL-CONE NOZZLES WITH A 3-INCH  DISCHARGE
                          ORIFICE.  THE HEADER  IS INSTALLED  OVER THE VENTURI THROAT TO PROVIDE GOOD
                          THROAT COVERAGE.  IF  THE NEW  HEADER PROVES SUCCESSFUL, NEW HEADERS WILL BE
                          INSTALLED IN ALL  VENTURIS.

                                                        75.7
                                                        72.6
                                                        73.6
                                                        75.8
                                                        74.4                 720   582    536  51.4
                                             13-1190

-------
                                                  UTILITY FGO SURVEY:  OCTOBER 1983 - SEPTEMBER 1984
TENNESSEE  VALLEY AUTHORITY:  WIDOWS CREEK 8 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  F6D   CAP.
                                                                S02  PART.  HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE NEW HEADER IN TRAIN B PROVED SATISFACTORY SO NEW HEADERS WILL BE
                         INSTALLED ON ALL FOUR VENTURIS.

                         OPTIMIZATION TESTS ON THE UNIT 8 SCRUBBER HAVE BEGUN AND WILL BE COMPLETED
                         BY THE END OF OCTOBER.  THE TESTS WILL INCLUDE TESTING THE ADDITIONAL FI-
                         BERGLASS REINFORCED PLASTIC GRIDS, NEW ABSORBER FULL-CONE SPRAY NOZZLES,
                         POLYPROPYLENE GRID-TYPE PACKING, AND TURBULENT CONTACT ABSORBER SPHERES.

                         THE 99.5X PARTICLE REMOVAL EFFICIENCY REPORTED FOR JUNE WAS THE AVERAGE
                         OF TWO EFFICIENCY TESTS RUN AS PART OF THE SCRUBBER OPTIMIZATION TESTS.
  7/79  A
       C
       D
       SYSTEM
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
 89.4
100.0
44.6
41.8
42.5
35.0
41.0
                                                                             744   291
                                                                        305  23.7
       ** PROSLEMS/SOLUTIONS/COMMENTS
                         CORROSION WAS FOUND IN THE REHEAT TUBES IN TRAIN A.   MATERIAL COLLECTED  ON
                         THE TUBES CONSISTED OF FLY ASH AND FERROUS CORROSION PRODUCTS.  CHLORIDE
                         AND SLURRY SOLIDS WERE ALSO DETECTED.  THE CHLORIDE  COULD HAVE BEEN DEPOS-
                         ITED DURING THE FIRE IN TRAIN A IN NOVEMBER 1978. THE NEOPRENE SCRUBBER
                         LINING CONTAINS CHLORIDE WHICH IS LIBERATED WHEN BURNED.   A DETAILED
                         ANALYSIS OF THE TUBE CORROSION IS BEING PERFORMED.

                         THE 99.01X PARTICLE REMOVAL EFFICIENCY REPORTED FOR  JULY  WAS AN AVERAGE  OF
                         THE EFFICIENCY TESTS RUN AS A PART OF THE SCRUBBER OPTIMIZATION TESTS.
  8/79
       A
       B
       C
       0
       SYSTEM
 99.2
100.0
 96.2
 96.1
 97.9
100.0
100.0
 94.9
100.0
 99.0
74.3
80.6
70.2
74.9
75.0
744   550
558  48.0
       »* PROBLEMS/SOLUTIONS/COMMENTS
                         THE BALL MILL WAS OUT OF SERVICE BECAUSE OF BROKEN BOLTS WHICH SECURE THE
                         INBOARD BEARING JOURNAL TO THE BALL MILL.  THE BOLTS WERE REPLACED AND THE
                         DISCHARGE END OF THE MILL WAS CLEANED.  BOLT HOLES WERE REAMED TO AC-
                         COMODATE THE LARGER DIAMETER BOLTS AND LOCK NUTS WERE USED.

                         THE SCRUBBER OPTIMIZATION TEST CONTINUED DURING AUGUST.
  9/79
       A
       B
       C
       D
       SYSTEM
100.0
100.0
 95.0
 94.4
 97.4
100.0
100.0
 96.7
100.0
 99.2
71.7
75.0
65.6
72.8
71.3
720   488
513  43.8
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE LIMESTONE BUCKET ELEVATOR, WHICH FEEDS LIMESTONE INTO THE BALL MILL
                         SURGE HOPPER, FAILED ON SEPTEMBER 28.  THE FAILURE, WHICH HAS OCCURRED
                         BEFORE, WAS CAUSED BY LIMESTONE PARTICLE BUILDUP ON THE BUCKETS ANO IN THE
                         BOTTOM OF THE HOUSING, RESULTING IN THE ELEVATOR JAMMING AND BREAKING OF
                         THE BUCKET GUIDE CHAINS.  THE ELEVATOR WILL BE REPLACED WITH BELT CONVEYORS
                         IN THE SUMMER OF 1980.
 10/79  A
 58.3
             72.7
                                     51.1
                                            13-1191

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TENNESSEE VALLEY AUTHORITY: WIDOWS CREEK 8 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
B
C
D
SYSTEM
100.
100.
93.
87.
0
0
4
9
95
95
100
90
.8
.2
.0
.9
67.
66.
70.
63.
3
9
3
9


744


523


476


3


.8
       «* PROBLEMS/SOLUTIONS/COMMENTS
11/79 A
B
C
D
SYSTEM
96.9
100.0
90.0
60.3
91.8
87.5
100.0
83.3
92.2
90.8
 12/79
  1/80
                         A PORTABLE CONVEYOR WAS USED TO SUPPLY LIMESTONE TO THE BALL MILL WHILE
                         THE BUCKET WAS BEING REPAIRED.

                         THE REPAIR OF THE BUCKET ELEVATOR CONSISTED OF THE REPLACEMENT OF 25
                         BUCKETS, REPLACEMENT OF 50 FEET OF DRIVE CHAIN ON EACH SIDE OF THE BUCKETS,
                         AND REMOVAL OF LIMESTONE ACCUMULATIONS ON ALL SURFACES WITH HIGH-PRESSURE
                         WATER.  THE BUCKET ELEVATOR WAS RETURNED TO SERVICE ON OCTOBER 6, 1979.

                                                       63.9
                                                       78.6
                                                       60.8
                                                       67.4
                                                       .67.7                  720   526    487  36.3
        **  PROBLEMS/SOLUTIONS/COMMENTS
                         CONSTRUCTION OF AN ON-SITE AREA IN WHICH TO STACK GYPSUM WAS COMPLETED
                         DURING EARLY NOVEMBER AND STACKING (LANDFILL) OPERATIONS BEGAN ON NOVEMBER
                         15.  THE TRAIN D SCRUBBER SLUDGE IS OXIDIZED BY AIR SPARGING, DEUATERED,
                         AND TRANSPORTED TO THE SITE IN TRUCKS.  THE GYPSUM PILE IS FORMED WITH A
                         BULLDOZER, AND RUNOFF AND LEACHATE ARE MONITORED FROM LEACHATE WELLS, A
                         LEACHATE POMD, AND A RUNOFF POND.  THE GYPSUM IS TO BE STACKED AS
                         HIGH AS 10 FEET.
        A
        B
        C
        D
        SYSTEM
                  87.6
                 100.0
                 100.0
                  95.8
                  95.9
            83.6
           100.0
            64.0
            65.7
            78.3
                        67.7
                        85.6
                        51.9
                        53.2
                        64.6
                                                                             744   603
                                                                                          481  37.5
        **  PROBLEMS/SOLUTIONS/COMMENTS
A
B
C
D
SYSTEM
70.4
83.5
100.0
28.3
70.6
79.8
100.0
100.0
54.7
83.6
                        ON DECEMBER 29,  1979 OPTIMIZATION TESTS WERE COMPLETED.   THE DATA OBTAINED
                        WILL BE ANALYZED TO DETERMINE THE BEST MODIFICATIONS THAT CAN BE INSTALLED
                        TO INCREASE THE  502 REMOVAL ON THE SCRUBBER.

                                                      39.2
                                                      56.3
                                                      55.5
                                                      26.9
                                                      44.5                  744    366    331  23.9
        *»  PROBLEMS/SOLUTIONS/COMMENTS
                         DURING JANUARY THE UNIT 8 BOILER EXPERIENCED LOW AVAILABILITY, CAUSING THE
                         FORCED OXIDATION TESTS TO BE DISCONTINUED UNTIL AFTER THE SCHEDULED
                         MAINTENANCE OUTAGE WHICH WILL BEGIN IN SEPTEMBER 1980.  THE  FORCED
                         OXIDATION  TESTS ARE  EXPECTED TO RESUME IN JANUARY  1981.
2/80  A
      B
      C
      D
      SYSTEM
80.0
86.5
91.1
87.6
86.3
88.6
90.2
97.6
98.2
93.7
                                                        72.7
                                                        74.0
                                                        80.0
                                                        80.6
                                                        76.8
                                                                            696   571
                                                                                           535   43.6
                                             13-1192

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
TENNESSEE VALLEY AUTHORITY:  WIDOWS CREEK 8 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                                                X REMOVAL
                                                                S02  PART.
                                                          PER  BOILER   FGD    CAP.
                                                         HOURS HOURS  HOURS  FACTOR
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         BY FEBRUARY 27, 1980, THE DIFFERENTIAL PRESSURE ACROSS THE TRAIN C ABSORB-
                         ER HAD REACHED 19 INCHES WATER GAGE.  THE HIGH ABSORBER DIFFERENTIAL
                         PRESSURE WAS CAUSED BY PLUGGING OF TURBULENT CONTACT ABSORBER (TCA)
                         SPHERES WHICH WERE INSTALLED DURING SCRUBBER OPTIMIZATION TESTS.  THE TCA
                         SPHERES WILL BE REMOVED IN MARCH.
 3/80  A
       B
       C
       D
       SYSTEM
 93.6
 93.0
 71.9
 93.3
 86.0
 88.0
 90.6
 73.3
 63.9
 79.0
             85.4
             87.9
             71.1
             62.0
             76.6
                                                                             744   722
                                                                       570  50.4
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         ON MARCH 3 THE TCA SPHERES INSTALLED IN TRAIN C AS PART OF THE OPTIMIZA-
                         TION TESTS WERE REMOVED.  THE SPHERES HAD BECOME PLUGGED,  RESULTING IN AN
                         ABSORBER DIFFERENTIAL PRESSURE OF 20 INCHES WATER GAGE.  THE SPHERES HAD
                         BEEN IN USE SINCE NOVEMBER 17, 1979.
 4/80
       A
       B
       C
       D
       SYSTEM
 96.8
 97.2
 96.3
 95.0
 96.3
 82.7
 79.5
 90.4
 70.9
 60.9
             46.5
             44.7
             50.8
             39.9
             45.5
                      720    405
            328  30.3
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         THE SCRUBBER SLURRY SPRAY NOZZLES WERE CLEANED AS PART OF A
                         SCHEDULED MAINTENANCE OUTAGE.

                         BALL MILL LINERS AND LIFTER BARS WERE REPLACED IN APRIL DURING A SCHEDULED
                         MAINTENANCE OUTAGE.
 5/80
       A
       B
       C
       D
       SYSTEM
 99.2
 96.1
 96.1
 96.1
 96.9
 74.5
 80.9
 87.7
 75.2
 79.6
             56.2
             61.0
             66.1
             56.7
             60.0
                      744   561
                                   447  38.3
       ** PROBLEMS/SOLUTIONS/COMMENTS
                         ON MAY 16 THE LIMESTONE BUCKET ELEVATOR FAILED CAUSING UNIT 8 TO BE
                         REMOVED FROM SERVICE FOR SIX HOURS.

                         THE SCRUBBER SLURRY SPRAY NOZZLES ON THE B, C AND D MODULES WERE CLEANED
                         DURING MAY.  THE CLEANING KEPT THE SYSTEM OFF LINE FOR 23 HOURS.
                         THE UNIT 8 BALL MILL MALFUNCTIONED ON MAY 28,
                         BEARING BOLTS.
                                                     DUE TO FAILURE OF INLET
 6/80
       A
       B
       C
       0
       SYSTEM
100.0
100.0
 99.6
100.0
 99.9
  5.3
100.0
 93.9
 98.6
 74.5
100.0
100.0
 99.5
100.0
 99.8
 4.9
91.8
86.3
90.6
68.3
720   661
492  44.0
       «* PROBLEMS/SOLUTIONS/COMMENTS
                         DURING JUNE THE BALL MILL REMAINED OUT OF SERVICE FOR MAJOR REPAIRS THAT
                         INCLUDED REPAIR OF THE BALL MILL SHELL (CRACKS PRESENT).  THE UNIT 7
                         SCRUBBER BALL MILL WAS USED IN PLACE OF THE UNIT 8 BALL MILL.
                                            13-1193

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TENNESSEE VALLEY AUTHORITY: WIDOWS CREEK 8 (CONT.)
_	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                502  PART. HOURS HOURS  HOURS FACTOR
7/80




A
B
C
D
SYSTEM
100.0
96.9
96.9
100.0
98.5
79.9
75.1
88.3
48.7
73.0
100.0
95.6
96.2
100.0
98.0
71.6
67.3
79.2
43.7
65.5




744 667 487 43.7
       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT 8 BALL MILL SHELL WAS SHIPPED TO THE FACTORY FOR REPAIRS ON
                         JULY 24.

                         CLEANING OF THE SLURRY SPRAY NOZZLES REMAINS A SIGNIFICANT SCRUBBER
                         MAINTENANCE ITEM.

 8/80  SYSTEM                                                                744

 9/80  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION FOR THE MONTHS OF AUGUST AND SEPTEMBER IS NOT AVAILABLE AT
                         THIS TIME.

10/80  SYSTEM                                                                744

11/80  SYSTEM                                                                720

12/80  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION FOR THE FOURTH QUARTER 1980 IS NOT AVAILABLE AT THIS TIME.

 1/81  SYSTEM                                                                744     0           .0

 2/81  SYSTEM                                                                672     0           .0

 3/81  SYSTEM                                                                744     0           .0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FIRST QUARTER 1981 THE BOILER WAS OUT OF SERVICE DUE TO A MAJOR
                         OVERHAUL.  THE UNIT IS EXPECTED TO BE ON LINE IN LATE MAY OR EARLY JUNE.

 4/81  SYSTEM                                                                720     0           .0

 5/81  SYSTEM                                                                744     o           .0

 6/81  SYSTEM                                                                720     0           .0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         MAJOR OVERHAUL OF BOILER (BOILER TUBE REPAIRS) CONTINUED THROUGHOUT THE
                         SECOND QUARTER 1981.

 7/81  SYSTEM                                                                744     0           .0

 8/81  SYSTEM                                                                744     0           .0

 9/81  SYSTEM                                                                720     0           .0
                                             13-1194

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983  -  SEPTEMBER

TENNESSEE  VALLEY AUTHORITY: WIDOWS CREEK 8 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD    CAP.
                                                                S02   PART. HOURS  HOURS   HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         WIDOWS CREEK UNIT 6 REMAINED OFF LINE THROUGHOUT THE THIRD  QUARTER 1981
                         AS THE BOILER OVERHAUL CONTINUED.

10/81  SYSTEM                                                                744

11/81  SYSTEM                                                                720

12/81  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FOURTH QUARTER THE UTILITY REPORTED  THAT NO MAJOR PROBLEMS WERE
                         ENCOUNTERED.  SOME GENERAL MAINTENANCE MAS  PERFORMED DURING THE PERIOD.

  1/82  SYSTEM                                                                744

  2/82  SYSTEM                                                                672

  3/82  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FIRST QUARTER OF 1982 THE UTILITY REPORTED THAT  NO MAJOR
                         PROBLEMS WERE ENCOUNTERED.  SOME GENERAL MAINTENANCE WAS PERFORMED DURING
                         THE PERIOD.  THE ENTIRE WIDOWS  CREEK PLANT  HAS  LATELY SEEN  LIMITED
                         OPERATION DUE TO LACK OF POWER  DEMAND.

  4/82  SYSTEM                                                                720

  5/82  SYSTEM                                                                744

  6/82  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR  FGD RELATED  PROBLEMS  WERE ENCOUNTERED
                         DURING THE SECOND QUARTER.  THE BOILER WAS  OPERATED AT  LOW  LOAD DURING
                         THIS  PERIOD DUE TO A LACK OF POWER  DEMAND.

  7/82  SYSTEM                                                                 744

  8/82  SYSTEM                                                                 744

  9/82  SYSTEM                                                                 720

 10/82  SYSTEM                                                                 744

 11/82  SYSTEM                                                                 720

 12/82  SYSTEM                                                                 744

  1/83  SYSTEM                                                                 744

  2/83  SYSTEM                                                                 672

  3/83  SYSTEM                                                                 744

  4/83  SYSTEM                                                                 720

  S/83  SYSTEM                                                                 744

  6/83  SYSTEM                                                                 720
                                             13-1195

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TENNESSEE VALLEY AUTHORITY: WIDOWS CREEK 8 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COmENTS

                         SINCE JUNE 1983 THE WIDOWS CREEK 8 FGD SYSTEM HAS OPERATED WITH  PROBLEMS
                         EXPERIENCED ON PUMPS, N02ZELS, ETC.  TVA HAS MANAGED TO KEEP THE DECAYING
                         FGD SYSTEM OPERATING WITH EXTENSIVE OPERATING AND MAINTENANCE EFFORTS.
                         HOWEVER, THE FGD SYSTEM WILL BE REMOVED FROM SERVICE MODULE BY MODULE BE-
                         GINING IN JULY FOR EXTENSIVE OVERHAUL AND REBUILDING WORK.

                         THE FORCED OXIDATION RSD WORK IS CONTINUING AT WIDOWS CREEK.  A  FULL SCALE
                         GYPSUM STACKING PROJECT HAS BEEN UNDERWAY FOR SOME TIME AND THE  RESULTS
                         HAVE BEEN FAVORABLE FROM TVA'S PERSPECTIVE.

  7/83  SYSTEM                                                                744
   •

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         RUBBER PIPING LINERS WERE REPLACED DURING JULY.

  8/83  SYSTEM                                                                744

  9/83  SYSTEM                                                                720

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         A MAJOR REWORKING TOOK PLACE AT UNIT 8 BEGINNING IN AUGUST 1983  AND CON-
                         TINUING THROUGH THE THIRD QUARTER.

                         INCLUDED IN THE REWORKING WAS THE REPLACEMENT OF VENTURI AND ABSORBER SPRAY
                         HEADERS AND SPRAY NOZZLES.

                         PUMPS WERE ALSO REPLACED DURING THE PERIOD.

                         ABSORBER GRIDS WERE REPLACED AND STAINLESS STEEL ABSORBER VESSEL LINERS
                         WERE INSTALLED DURING THE PERIOD.  THE OUTER ABSORBER LAGGING WAS ALSO RE-
                         PLACED WITH STAINLESS STEEL.

                         BYPASS DAMPERS AND THEIR ASSOCIATED DUCT WORK WERE REPLACED DURING THE
                         PERIOD DUE TO LEAKING PROBLEMS.

                         NEW STEAM TRAPS WERE INSTALLED TO PREVENT LEAKS WITHIN THE INDIRECT REHEAT
                         SYSTEM.

                         NEW ABSORBER FORCED DRAFT FANS WERE INSTALLED DURING THE THIRD QUARTER.

10/83  SYSTEM                                                                744

11/83  SYSTEM                                                                720

12/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT UNIT 8 WAS PLACED BACK IN SERVICE DURING THE
                         FOURTH QUARTER AND THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED.

  1/84  SYSTEM                                                                744

  2/84  SYSTEM                                                                696

  3/84  SYSTEM                                                                744

  4/84  SYSTEM                                                                720
                                             13-1196

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TENNESSEE VALLEY AUTHORITY: WIDOWS CREEK 8 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  F6D   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT UNIT 8 WAS TAKEN OUT OF SERVICE DURING APRIL
                         1984 DUE TO BURNT OUT BEARINGS IN THE TURBINE GENERATOR. THE OUTAGE CON-
                         TINUED THROUGH THE THIRD QUARTER. THE UNIT IS SCHEDULED TO BE PLACED BACK
                         IN SERVICE DURING THE FOURTH QUARTER OF 1984.

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT A FORCED OXIDATION SYSTEM WILL BE EMPLOYED AT
                         WIDOWS CREEK 7 AND 8 FOR SLUDGE TREATMENT. A SPARGER NETWORK AT THE
                         BOTTOM OF THE THICKENER TANK WILL BE INSTALLED AND AN AGITATOR WILL BE
                         UTILIZED FOR SOLID SUSPENSION.
                                             13-1197

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
SOS EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MM
NET UNIT GENERATING CAPACITY U'O/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - X
     AVERAGE MOISTURE CONTENT - X
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - X
     RANGE SULFUR CONTENT - X
     AVERAGE CHLORIDE CONTENT - X
     RANGE CHLORIDE CONTENT - X

*** PARTICLE CONTROL

 ** ESP
     NUMBER
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - X

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
TEXAS MUNICIPAL POWER AGENCY
GIBBONS CREEK
1
CARLOS
TEXAS
D
   43.
  516.
******
  400
               (  .100 LB/MMBTU)
               ( 1.200 LB/MMBTU)
               (****** LB/MMBTU)
  400
  406
  400
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
  766.13       (1633500 ACFM)
   93.3        (  200 F)
  142.         (  465 FT)
REINFORCED CONCRETE
*******        (***** FT)
               (  4860 BTU/LB)
                3900-6500
COAL
LIGNITE
11304.

   25.00
10.0-38.6
   35.00
29.0-45.0
    1.06
0.8-2.3
      .01
0.00-0.07
COLD SIDE
LODGE-COTTRELL
  766.1
  148.3
     .2
   99.8
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
THROWAWAY PRODUCT
WET SCRUBBING
LIMESTONE
COMBUSTION ENGINEERING
TIPPETT & GEE
               (1623500 ACFM)
               (  299 F)
               (  1. IN-H20)
                                            13-1198

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 -  SEPTEMBER

TEXAS MUNICIPAL POWER AGENCY: GIBBONS CREEK 1 (CONT.)

     DEVELOPMENT LEVEL                          FULL SCALE
     NEW/RETROFIT                               NEW
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY - 7,   99.87
     UNIT DESIGN S02 REMOVAL EFFICIENCY - 7.
     ENERGY CONSUMPTION - 7.
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED
   87.36
    1.4
 1
10/83
11/82
 1/77
 ** DESIGN AND OPERATING PARAMETERS
     SPACE REQUIREMENTS - SQ M
     OPER. 4 MAINT. REQUIREMENT - MANHR/DAY

 «* QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 »« ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     LIQUID RECIRCULATION RATE -  LITER/S
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - 7.

  «« MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     FREEBOARD DISTANCE  - M
     DISTANCE BETWEEN VANES - CM
     VANE ANGLES - DEGREES
     PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH RATE - L/S

  ** REHEATER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     INLET FLUE GAS FLOW RATE - CU. M/S
     INLET FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

  ** FANS
     NUMBER
     NUMBER OF SPARES
               (  139392 SQ FT)
12949.5
   48.0
NR
NR
 3
 1
SPRAY TOWER
OPEN COUNTERCURRENT SPRAY
N/A
COMBUSTION ENGINEERING
29.0 X 37.0
STAINLESS STEEL
AUSTENITIC
TYPE 316L
NONE
N/A
N/A
NONE
 5393.         (85600 GPM)
     .2        (  .9 IN-H20)
    3.8        ( 12.6 FT/S)
  766.13       (1623500 ACFM)
   60.0        (  140 F)
   87.3
PRIMARY COLLECTOR
1
IMPINGEMENT
BAFFLE
CLOSED VANE
VERTICAL
2
1
2.44 (
5.1 (
45
.2 (
2.7 (
STAINLESS STEEL
NR
37.8 (








8.0 FT)
2.00 IN)

.9 IN-H20)
9.0 FT/S)


600 GAL/MI
  3
IN-LINE
STEAM
NR
  766.13
    93.3
CARBON STEEL
AISI 1110
               (1623500 ACFM)
               (  200 F)
                                             13-1199

-------
UTILITY FGD SURVEY? OCTOBER 1983 - SEPTEMBER 1984

TEXAS MUNICIPAL POUER AGENCY: GIBBONS CREEK 1 (CONT.)
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER

 ** TANKS
     SERVICE
      ABSORBER RECYCLE
      NR
      REAGENT PREP  PRODUCT

  **  PUMPS
      SERVICE
      ABSORBER  SPRAY
      ABSORBER  BLEED
      THICKENER UNDERFLOW
      WASH
      MILL  CIRCUIT
      RECIRCULATION
      ADDITIVE  FEED

  **  SOLIDS CONCENTRATING/DEWATERING
      DEVICE
      NUMBER
      NUMLER OF SPARES
      CONFIGURATION
      DIMENSIONS   FT
      SHELL GENERIC MATERIAL TYPE
      FEED  STREAM CHARACTERISTICS
      OUTLET STREAM CHARACTERISTICS

  **  SOLIDS CONCENTRATING/DEWATERING
      DEVICE
      NUMBER
      NUMBER OF SPARES
      SHELL GENERIC MATERIAL TYPE
      FEED  STREAM CHARACTERISTICS
      OUTLET STREAM CHARACTERISTICS

***  SLUDGE
AXIAL
COMBUSTION ENGINEERING; MITSUBISHI HEAVY INDUSTR
NR
FORCED DRAFT
DRY
  960.79       (3036000 ACFM)
  148.3        (  299 F)
CARBON STEEL
NR
NR
NR
NR
NR
NR
NR
REHEATER/ESP OUTLET
CARBON STEEL
AISI 1110
CARBON STEEL
AISI 1110
WET BALL MILL
COMPARTMENTED
NR
COMBUSTION ENGINEERING/KENNEDY VAN SAUN
 1
                                                NUMBER
NUMBER

  15
   3
   Z
   Z
   Z
   Z
   3
THICKENER
 2
0
CYLINDRICAL
190.0 DIA X 90.0
CARBON STEEL
10X SOLIDS
25X SOLIDS
VACUUM FILTER
 3
0
CARBON STEEL
10X SOLIDS
25X SOLIDS
                                            13-1200

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TEXAS MUNICIPAL POWER AGENCY: GIBBONS CREEK 1 (CONT.)
** TREATMENT
    METHOD
    DEVICE
    PROPRIETARY PROCESS
    INLET FLOW RATE - LITER/S
    INLET QUALITY - X

** DISPOSAL
    NATURE
    TYPE
    LOCATION
    SITE TRANSPORTATION METHOD
    SITE TREATMENT

«* PROCESS CONTROL AND INSTRUMENTATION
    CHEMICAL PARAMETERS
    MONITOR LOCATION
    PROCESS CONTROL MANNER
    PROCESS CHEMISTRY MODE

** WATER BALANCE
    WATER LOOP TYPE
    MAKEUP WATER ADDITION - LITERS/S

** FGO SPARE CAPACITY INDICES
    ABSORBER - 7.

** FGD SPARE COMPONENT INDICES
    ABSOSBER
                                                FIXATION
                                                PUG MILL
                                                CONVERSION SYSTEMS tPOZ-0-TECl
                                                   16.4        (  260 GPM)
                                                   25.0
                                                FINAL
                                                LANDFILL
                                                ON-SITE
                                                TRUCK
                                                NONE
                                                S02 INLET GAS, STACK S02
                                                INLET TO ABSORBER STACK
                                                AUTOMATIC
                                                FEEDBACK
                                                CLOSED
                                                   36.5
                                                   50.0


                                                    1.0
                                                               (  580 GPM)
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
 11/82  SYSTEM

       »* PROBLEMS/SOLUTIONS/COMMENTS
                                                                             720
                         THE UTILITY REPORTED THAT  INITIAL START-UP OF THE FGD SYSTEM OCCURRED
                         DURING NOVEMBER,  1982.
12/82  SYSTEM

 1/63  SYSTEM

 2/83  SYSTEM

 3/83  SYSTEM

      *»  PROBLEMS/SOLUTIONS/COMMENTS
                                                                             744

                                                                             744

                                                                             672

                                                                             744
                         THE UTILITY  REPORTED  THAT  NO  MAJOR  FGD-RELATED  PROBLEMS WERE  ENCOUNTERED
                         DURING  THE PERIOD  OF  NOVEMBER,  1982 THROUGH  MARCH,  1983.
 4/83  SYSTEM

 5/83  SYSTEM

 6/83  SYSTEM

      ** PROBLEMS/SOLUTIONS/COMMENTS
                                                                              720

                                                                              744

                                                                              720
  7/83  SYSTEM
                         THE UTILITY  REPORTED  THE  FGD  SYSTEM SUCCESSFULLY PASSED COMPLIANCE TESTING
                         IN APRIL.  NO  MAJOR FGD-RELATED  PROBLEMS WERE ENCOUNTERED THROUGHOUT THE
                         PERIOD.

                                                                              744
                                             13-1201

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER

TEXAS MUNICIPAL POWER AGENCY: GIBBONS CREEK 1 (CONT. )
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  V. REMOVAL    PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS   HOURS  FACTOR


 8/83  SYSTEM                                                                 744

 9/83  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE UNIT AND FGD SYSTEM ARE STILL OPERATING IN A
                         SHAKEDOWN PHASE.  PROBLEMS REPORTED INCLUDE REHEATER CORROSION  AND MIST
                         ELIMINATOR PLUGGING.

10/83  SYSTEM                                                                 744

11/83  SYSTEM                                                                 720

12/83  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE ONLY MAJOR OUTAGE DURING THE FOURTH QUARTER
                         WAS FOR A 10 DAY PRE-INSPECTION OF THE UNIT AND FGD SYSTEM DURING
                         NOVEMBER.  THE BOILER BOTTOM ASH SYSTEM AND ABSORBER REHEATERS  WERE IN-
                         SPECTED.  THE MAIN UNIT OUTAGE IS SCHEDULED TO TAKE PLACE NEXT  YEAR FROM
                         FEBRUARY 17 THROUGH MARCH 17.

                         THE UTILITY REPORTED REHEATER TUBE CORROSION DURING THE FOURTH  QUARTER.
                         TWO REHEATERS HAVE FAILED SINCE THE START UP OF THE FGD SYSTEM.  THE  CAR-
                         BON STEEL REHEATER TUBES CORRODE ONLY AT THE ELBOWS.  THE UTILITY IS  PRES-
                         ENTLY  CONSIDERING REMOVING THE DISTRIBUTION VANES WHICH DEFLECT FLUE  GAS
                         AWAY FROM'THE ELBOUS.  BECAUSE OF THE DISTRIBUTION  VANES, THE ELBOWS  TEND
                         TO HAVE HIGHER AMOUNTS OF CONDENSATION AND SOLIDS BUILD UP WHICH HELP AID
                         CORROSION.

                         OTHER  PROBLEMS REPORTED INCLUDE HARD AND SOFT SCALE FORMATION ON THE  MIST
                         ELIMINATORS AND GREATER THAN DESIGN PRESSURE DIFFERENTIALS ACROSS THE AB-
                         SORBER MODULES.  THE UTILITY REPORTS HAVING TO CLEAN SCALE FROM MIST  ELIM-
                         INATORS APPROXIMATELY ONCE EVERY TWO WEEKS PER MODULE.

  1/84  SYSTEM                                                                 744

  2/84  SYSTEM                                                                 696

  3/84  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A SIX  WEEK UNIT OUTAGE WAS REPORTED FOR THE PERIOD  OF FEBRUARY  18 TO  MARCH
                         27, 1984.  DURING THIS TIME, NEW VENT PIPES WERE REPLACED IN THE DUCT WORK.
                         THE VENT PIPES HAD CORRODED DUE TO CONDENSATION AND ACIDIC CONDITIONS.

                         THE UTILITY REPORTED THAT MIST ELIMINATOR BULK ENTRAINMENT CLEANING WAS
                         PERFORMED DURING THE FEBRUARY-MARCH OUTAGE.  IT WAS ALSO REPORTED THAT THIS
                         TYPE OF CLEANING IS NECESSARY ON A MONTHLY BASIS.

                         THE THICKENER TANK LINER AND RAKE WERE REPLACED DURING THE FEBRUARY-MARCH
                         OUTAGE.  THE FIBERGLASS LINER HAD DEVELOPED LEAKS AND THE RAKE  BROKE  DUE TO
                         HIGH SOLIDS BUILD UP.

                         WARRANTY WORK WAS PERFORMED ON SLURRY SPRAY PUMP REDUCTION GEARS DURING THE
                         FEBRUARY-MARCH OUTAGE.  AN OVERHEATING OF THE REDUCTION GEAR OIL WOULD NOT
                         ALLOW  PROPER LUBRICATION.

 4/84  SYSTEM                                                                 720

 5/84  SYSTEM                                                                 744
                                             13-1202

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

TEXAS MUNICIPAL POWER AGENCY: GIBBONS CREEK 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                SOS  PART. HOURS HOURS  HOURS FACTOR


 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  'MODULE A1 REHEATER MAS REPLACED DURING AUGUST DUE TO CORROSION.

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED THAT THE FGD SYSTEM WAS DOWN APPROXIMATELY SOX OF THE
                         TIME DURING THE THIRD QUARTER OF 1984 DUE TO SLURRY SPRAY PUMP PROBLEMS.
                         REPLACEMENT HUBS WERE INSTALLED TO CORRECT AN IMPELLER PROBLEM AND THEY
                         EVENTUALLY CAME LOOSE AT THE ATTACHMENT TO THE IMPELLER SHAFT.  THE HUSS
                         WERE SENT BACK TO THE MANUFACTURER.  LOOSENING OF THE SHAFT'S RUBBER LINER
                         IS ALSO REPORTED AS A COMMONLY OCCURRING PROBLEM.

                         THE  UTILITY IS PRESENTLY TESTING A SCALE INHIBITOR IN HOPES OF REDUCING
                         THE  FREQUENCY OF SCALE CLEANING AND THUS INCREASE AVAILABILITY.  THE ANTI-
                         SCALANT, REFERRED TO AS P-70 IS A POLYACRYLATE POLYMER WHICH INTERFERES
                         WITH THE GROWTH PATTERN OF CALCIUM SULFATE CRYSTALS IN A SUPER SATURATED
                         SOLUTION.  THE CRYSTALS ARE THEORETICALLY DEFORMED AND SOFTENED.  TESTING
                         WILL BEGIN ON A CLEAN MODULE, AND THUS CONCLUSIVE RESULTS HAVE NOT BEEN
                         REPORTED.
                                             13-1203

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY M/FGD - MM
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RAN3E CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** ESP
     NUMBER
     TYPE
     SUPPLIER

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - V.
 TEXAS POWER & LIGHT
 SANDOW
 ROCKDALE
 TEXAS
 D
    43.
   516.
 ******
 *****
   545
   545
   495
   382
                  ,100 LB/MMBTU)
                  .200 LB/MMBTU)
               (****** LB/MMBTU)
 COMBUSTION ENGINEERING
 PULVERIZED COAL
 BASE
 ********       (******* ACFM)
   168.3        (  335 F)
 ******         (**** FT)
 NR
 *******        (***** FT)
                (****** BTU/LB)
                 ******
COAL
LIGNITE
******

   13.00
******
   35.00
******
    1.60
******
********
******
 COLD SIDE
 C.E. WALTHER
  0
 NONE
 N/A
 N/A
 N/A
 N/A
 N/A
 N/A
 N/A
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIMESTONE
 COMBUSTION ENGINEERING
 BROWN 4 ROOT
 FULL SCALE
 NEW
7.   99.70
    75.00
                                             13-120'*

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
TEXAS POWER & LIGHT:  SANDOM 4 (CONT.)

     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 »* DESIGN AND OPERATING PARAMETERS
     SPACE REQUIREMENTS - SQ M

 «« QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     .LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     INLET GAS TEMPERATURE - C

 »* MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 »» REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     PERCENT GAS BYPASSED - AVG
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 **  FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
 1
 1/81
 0/78
 4046.7        (  43560 SQ FT)
NR
NR
 4
 1
SPRAY TOWER
OPEN COUNTERCURRENT SPRAY
N/A
COMBUSTION ENGINEERING
NR
NR
NR
NR
NR
NR
NONE
  160.0        (  320 F)
NR
NR
NR
NR
NR
NR
BYPASS
COLD SIDE
N/A
   30.0
NR
NR
NR
NR
FORCED DRAFT
DRY
CARBON STEEL
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
WET BALL MILL
NR
NR
                                             13-1205

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TEXAS POWER & LIGHT? SANDOW 4 (CONT.)
 *# PUMPS
     SERVICE                                    NUMBER
     NR                                         »***

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE                                     NR

*** SLUDGE

 ** TREATMENT
     METHOD                                     FORCED OXIDATION
     DEVICE                                     NR
     PROPRIETARY PROCESS                        N/A

 ** DISPOSAL
     NATURE                                     FINAL
     TYPE                                       POND
     SITE TREATMENT                             NONE

 »* WATER BALANCE
     WATER  LOOP TYPE                            CLOSED

 »* FGD  SPARE  CAPACITY  INDICES
     ABSORBER  - V.                                     .0

 ** FGD  SPARE  COMPONENT INDICES
     ABSORBER                                         .0
 	PERFORMANCE DATA	
 PERIOD  MODULE  AVAILABILITY  OPERABILITY  RELIABILITY UTILIZATION  '/. REMOVAL    PER   BOILER   FGD    CAP.
                                                                S02   PART.  HOURS  HOURS  HOURS FACTOR


 12/80  SYSTEM                                                                 744

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          OPERATIONS  AT  SANDOW  4  COMMENCED IN  DECEMBER 1980.   THE  SYSTEM  IS PRESENTLY
                          IN THE SHAKEDOWN/DEBUGGING  PHASE OF  OPERATION.

  1/81  SYSTEM                                                                 744

  2/81  SYSTEM                                                                 672

  3/81  SYSTEM                                                                 744

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE UTILITY REPORTED  THAT NO MAJOR FGD PROBLEMS HAVE BEEN EXPERIENCED
                          SINCE  STARTUP.  HOWEVER, APPRECIABLE AMOUNTS OF COAL WERE NOT FIRED  UNTIL
                          MARCH.

  4/81  SYSTEM                                                                 7ZQ

  5/81  SYSTEM                                                                 744

  6/81  SYSTEM                                                                 720

        ** PROBLEMS/SOLUTIONS/COMMENTS

                          DURING THE  SECOND  QUARTER 1981 THE UTILITY  REPORTED THAT NO MAJOR FGD-
                          RELATED PROBLEMS WERE ENCOUNTERED.

  7/81  SYSTEM                                                                 744

  8/81  SYSTEM                                                                 744
                                             13-1206

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TEXAS POWER & LIGHT: SANOOW 4 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02   PART. HOURS HOURS  HOURS  FACTOR


 9/81  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         AS OF THE END OF SEPTEMBER, THE ONLY MAJOR OPERATIONAL PROBLEM REPORTED
                         FOR THE SANDOW 4 FGD  SYSTEM HAS BEEN EXCESSIVE MIST  ELIMINATOR PLUGGING.

                         SANDOW 4 IS EXPECTED  TO GO OFF-LINE IN MID-OCTOBER FOR AN OVERHAUL.

10/81  SYSTEM                                                                 744

11/81  SYSTEM                                                                 720

12/81  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED  THAT NO MAJOR FGO-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FOURTH  QUARTER OF 1981.

  1/82  SYSTEM                                                                 744

  3/82  SYSTEM                                                                 672

  3/82  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED  THAT ONLY GENERAL  CLEANING  WAS  REQUIRED DURING THE
                         FIRST QUARTER  OF  1982.   NO  FORCED  OUTAGES WERE  ENCOUNTERED  DURING THIS
                         PERIOD.

                         THE UTILITY STILL REPORTS  ENCOUNTERING  PROBLEMS  WITH MIST ELIMINATOR
                         PLUGGING.

  4/82  SYSTEM                                                                 720

  5/82  SYSTEM                                                                 744

  6/82  SYSTEM                                                                 720

  7/82  SYSTEM                                                                 744

  8/82  SYSTEM                                                                 744

  9/82  SYSTEM                                                                 720

 10/82  SYSTEM                                                                 744

 11/82  SYSTEM                                                                 720

 12/82  SYSTEM                                                                 744

  1/83  SYSTEM                                                                 744

  2/83  SYSTEM                                                                 672

  3/83  SYSTEM                                                                 744
                                             13-1207

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TEXAS POWER & LIGHT: SANDOW 4 (CONT. )
	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER   FGD    CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE PERIOD OF APRIL 1982 TO MARCH  1983.

 4/83  SYSTEM                                                                720

 5/83  SYSTEM                                                                744

 6/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION MAS UNAVAILABLE FOR THE PERIOD OF APRIL 1982 TO JUNE 1983.

 7/83  SYSTEM                                                                744

       ** FROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE UNIT WAS IN A SCHEDULED OVERHAUL DURING  JULY,
                         HOWEVER,- THE FGD SYSTEM WAS 100 PERCENT AVAILABLE.

 8/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         TWO SHORT FORCED OUTAGES WERE REPORTED DURING AUGUST DUE TO THE  FAILURE OF
                         SPRAY HEADERS.

 9/83  SYSTEM                                                                720

 10/83  SYSTEM                                                                744

 11/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE PERIOD OF SEPTEMBER THROUGH NOVEMBER 1983.

 12/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A SCHEDULED 2-WEEK BOILER OVERHAUL TOOK PLACE IN DECEMBER.  DURING THIS
                         TIME, MIST ELIMINATOR PLUGGING REPAIRS WERE MADE AND PLUGGED SPRAY NOZZLES
                         WERE CLEANED.

 1/84  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720
                                             13-1208

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

TEXAS POWER t LIGHT:  SANDOM 4 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE FIRST THREE QUARTERS OF 1984.
                                             13-1309

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FSD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW
TEXAS UTILITIES
MARTIN LAKE
1
TATUM
TEXAS
D
43. ( .100
516. ( 1.200
****** (******
3000
793
750
760
595






LB/MMBTU)
LB/MMBTU )
LB/MMBTU )





 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN EOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

 *** PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
     NUMBER
     TYPE

 ** ESP
     NUMBER
     NUMBER OF SPARES
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

 *** FGD SYSTEM
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
 1494.51       (3167000 ACFM)
  168.3        ( 335 F)
  137.         ( 450 FT)
CONCRETE
*»**«**        (««**« FT)
               (  7380 BTU/LB)
                6973-7894
COAL
LIGNITE
17166.

********
8.0-12.0
   33.00
29.0-37.9
     .90
0.7-1.5
********
******
 0
NONE
 1
 0
COLD SIDE
RESEARCH-COTTRELL
 1494.5        (3167000 ACFM)
  168.3        (  335 F)
     .5        (2. IN-H20)
   99.4
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                             13-1210

-------
TEXAS UTILITIES: MARTIN LAKE i (CONT.)
                                                  UTILITY F6D SURVEY:  OCTOBER 1983 - SEPTEMBER 1964
 ** GENERAL DATA
     SALEABLE PRODUCT/THROMAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - 7.
     ENERGY CONSUMPTION - 7.
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 «* DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X

 ** QUENCHER/PRESATURATOR
     NUMBER
     TYPE
     SUPPLIER
     INLET GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
    THROWAWAY PRODUCT
    MET SCRUBBING
    LIMESTONE
    NONE
    RESEARCH-COTTRELL
    C.T.  MAIN
    FULL  SCALE
    NEW
    7,   99.40
       71.00
        1.3
      1
    10/77
      4/77
      5/76
         1.50
     CYCLONIC  SPRAY  CHAMBER
     RESEARCH-COTTRELL
       168.3        (   335 F)
     CARBON STEEL
     AISI 1110
  »* ABSORBER
     NUMBER
     NUM3ER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     DISTANCE BETWEEN GAS CONTACTING ZONES
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     S02 REMOVAL EFFICIENCY - 7.

  ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUM3ER OF STAGES
     NUMBER OF PASSES PER STAGE
     PRESSURE DROP - KPA
     SUFERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC  TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     MASH WATER SOURCE
     WASH RATE - L/S
      6
      0
     COMBINATION TOWER
     SPRAY/PACKED
     N/A
     RESEARCH-COTTRELL
     28 DIA X 100 HIGH
     CARBON STEEL
     AISI 1110
     N/A
     ORGANIC
     GLASS FLAKE-FILLED POLYESTER
     FLAKELINE 103
     VERTICAL CROSS CHANNEL FIXED GRID PACKING
      4
- CM    91.4        (    36.0IN)
        13.4        (  99.9 GAL/1000 ACF)
         1.1        (  4.5 IN-HZO)
         2.7        (   9.0 FT/S)
        95.0
     PRIMARY COLLECTOR
      6
      0
      1
     IMPINGEMENT
     BAFFLE
     CLOSED VANE
     HORIZONTAL
         Z
         3
          .2        (
         2.4        (
     ORGANIC
     POLYPROPYLENE
     FRESH
         7.9
  1.0 IN-H20)
   8.0 FT/S)
(   126 GAL/MIN)
                                             13-1E11

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 193-4

TEXAS UTILITIES: MARTIN LAKE i (CONT.)
 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     PERCENT GAS BYPASSED - AVG
     TEMPERATURE INCREASE - C
     INLET FLUE GAS TEMPERATURE - C
     OUTLET FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 *# DAMPERS
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 »* DAMPERS
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 #* DAMPERS
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
BYPASS
COLD SIDE
N/A
   25.0
   22.2
   60.0
   82.2
NR
NR
CENTRIFUGAL
UNIT
FORCED DRAFT
DRY
  375.48
  168.3
CARBON STEEL
(    40 F)
(   140 F)
(   180 F)
(  795680 ACFM)
(   335 F)
 6
LOUVER
NR
MOSSER; FORNEY ENGINEERING
CARBON STEEL
AISI 1110
NONE
N/A
 6
LOUVER
NR
MOSSER
CARBON STEEL
AISI 1110
STAINLESS STEEL
AUSTENITIC
 1
LOUVER
NR
NR
CARBON STEEL
AISI 1110
STAINLESS STEEL
AUSTENITIC
LOUVER
NR
NR
CARBON STEEL
AISI 1110
NONE
N/A
LOUVER
NR
NR
CARBON STEEL
AISI 1110
NONE
N/A
                                            13-1212

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
TEXAS UTILITIES:  MARTIN LAKE i ICONT.)
 «* DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 »* DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 *» REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER

 ** TANKS
     SERVICE
     ABSORBER RECYCLE
     PRESATURATOR/QUENCHER
     LIMESTONE SLURRY
     WET WELL
     MILL SLURRY SUMP

  ** PUMPS
     SERVICE
     QUENCHER FEED
     SLURRY FEED
     ABSORBER RECIRCULATION
     ABSORBER PACKING
     MILL SLURRY
     THICKENER UJJDERFLOW
     MAIN WATER RECYCLE {THICKENER OVERFL
     AREA SUMP PUMPS

  ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

  ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMSER
     NUM3ER OF SPARES
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
INLET
CARBON STEEL
AISI 1110
NONE
N/A
OUTLET
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER
BYPASS
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER
WET BALL MILL
COMPARTMENTED
TUBE MILL
KENNEDY VAN SAUN
                                                NUMBER
   3
   6
   1
   4
#***
NUMSER

  12
   Z
   9
   9
   8
   3
   3
****
CENTRIFUGE
 3
THICKENER UNDERFLOW
35X SOLIDS
65X SOLIDS
TO FLY ASH MIXING
TO LIMESTONE SLURRY PREPARATION
THICKENER
 1
0
140.0 OIA X 12.0
CARBON STEEL  [WALLS]; INORGANIC  [BOTTOM!
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER  [WALLS]; MAT-REINFO
ABSORBER BLEED
10-12X SOLIDS
35X SOLIDS
                                             13-1213

-------
UTILITY FGO SURVEY'- OCTOBER 1983 - SEPTEMBER 1984

TEXAS UTILITIES: MARTIN LAKE i (CONT.)
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

*** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS
     INLET QUALITY - V.

 »* DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT

 ** PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     PHYSICAL VARIABLES
                      TO CENTRIFUGE
                      TO LIMESTONE SLURRY PREPARATION
                      STABILIZATION
                      MULLER-TYPE BLENDER
                      NONE
                         65.0
                      FINAL
                      LANDFILL
                      ON-SITE
                      RAIL
                      NONE
                      PH
                      LIQUID  LEVEL,  LIQUID i GAS FLOW
  *#  WATER  BALANCE
      WATER LOOP TYPE                            CLOSED
      MAKEUP WATER  ADDITION -  LITERS/S               3
-------
                                                  UTILITY FGO SURVEY! OCTOBER 1983 - SEPTEMBER 1984

TEXAS UTILITIES: MARTIN LAKE i (CONT.J
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE SLUDGE HANDLING SYSTEM DOES NOT OPERATE UNIFORMLY OVER EXTENDED
                          PERIODS.

 2/78  SYSTEM                                                                672

 3/78  SYSTEM                                                                744

       *» PROBLEMS/SOLUTIONS/COMMENTS

                          CERTIFICATION MAS RECEIVED FROM THE EPA DURING THE PERIOD.  THE BOILER AND
                          FGD SYSTEM OPERATED THROUGHOUT THE PERIOD.

                          THE UTILITY IS STILL HAVING SOME PROBLEMS WITH THE SLUDGE HANDLING SYSTEM.
                          SOME FORCED OUTAGE TIME OCCURRED.

 4/78  SYSTEM                                                                720

 5/78  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE UNIT WAS TAKEN OFF LINE IN APRIL FOR AN ANNUAL TWO MEEK OUTAGE.

                          GENERATOR PROBLEMS WERE ENCOUNTERED IN MAY CAUSING THE UNIT TO BE TAKEN
                          OFF LINE THROUGH THE END OF THE MONTH.

 6/78  SYSTEM                                                                720

 7/78  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE DAMPERS FOR EACH ABSORBER MODULE WERE NOT FUNCTIONING PROPERLY.  IT
                          HAS BEEN IMPOSSIBLE TO ISOLATE INDIVIDUAL MODULES FOR REPAIRS (THE ENTIRE
                          SYSTEM WOULD HAVE TO BE SHUT DOWN IF REPAIRS WERE REQUIRED ON ONLY ONE
                          MODULE).

                          THE UNIT IS NOW CONSIDERED TO BE OPERATING COMMERCIALLY.  OPERATIONS HAVE
                          BEEN SATISFACTORY.  DEPENDING ON THE LIGNITE BURNED THE SCRUBBER CAN BE
                          OPERATED WITH ONLY FOUR OR SIX TOWERS ON LINE AND STILL BE IN COMPLIANCE.

                          THERE HAVE BEEN PROBLEMS WITH THE PH METERS.  THE METERS HAVE NOT OPERATED
                          PROPERLY FOR SOME TIME NOW.

                          THE UTILITY HAS GENERALLY ONLY HAD TO PERFORM GENERAL MAINTENANCE ON THE
                          SCRUBBER TOWERS.

 8/78  SYSTEM                                                                744

 9/78  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          ISOLATION DAMPER PROBLEMS CONTINUED.

                          THE UNIT CONTINUES TO REQUIRE EXCESSIVE MAINTENANCE.  FGD  SYSTEM ACCEPT-
                          ANCE TEST WERE PERFORMED BY THE  UTILITY DURING  AUGUST.   RESULTS  ARE NOT
                          YET AVAILABLE.

                          FLOW MEASUREMENT INSTRUMENTATION HAS BEEN  FAILING.
                                             13-1215

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

TEXAS UTILITIES: MARTIN LAKE i (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                          OPACITY HAS OCCASIONALLY BEEN HIGHER THAN EXPECTED (20-25Z) RESULTING FROM
                          ESP PROBLEMS.

10/78  SYSTEM                                                                744

11/78  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          NO FGD SYSTEM PROBLEMS WERE REPORTED FOR THE OCTOBER-NOVEMBER PERIOD.

                          OUTAGES ARE PRIMARILY A RESULT OF ESP PROBLEMS.  THE UTILITY IS RELUCTANT
                          TO OPERATE SCRUBBERS WHEN THE ESP SHOWS HIGH OPACTIY FOR FEAR OF PLUGGING
                         PROBLEMS.
                                                                      •
12/78  SYSTEM                                                                7**

  1/79  SYSTEM                                                                7**

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE FGD SYSTEM WAS SHUT DOWN WHILE THE BOTTOM ASH POND WAS CLEANED OUT.
                          THE UTILITY HAS BEEN DUMPING SLUDGE INTO THE BOTTOM ASH POND WHICH WAS
                          DESIGNED FOR BOTTOM ASH ONLY.  ALSO SLUDGE IS PRODUCED FASTER THAN IT CAN
                          BE REMOVED BY RAIL CAR.  THE ACTUAL PROBLEM IS REPORTEDLY IN THE DEWATER-
                          ING SYSTEM.  HEAVY RAIN FALL HAS AGGREVATED THE SLUDGE DISPOSAL PROBLEM
                          BY FOULING THE THICKENER OPERATIONS AND BY THREATENING POND OVERFLOW.

                          SOME MIST ELIMINATOR WASH PROBLEMS WERE ENCOUNTERED.

                          THE FGD SYSTEM REPORTEDLY FUNCTIONED ACCEPTABLY WHEN OPERATED DURING
                          DECEMBER AND JANUARY.

                          COAL HANDLING WAS A SERIOUS PROBLEM DUE TO FREEZING OF THE COAL IN THE
                          HOPPERS.  THIS PROBLEM EFFECTED ALL UNITS AT. MARTIN LAKE FORCING THE
                          UTILITY'S GAS AND OIL UNITS TO CARRY THE POWER LOAD.  ALL OF THE MARTIN
                          LAKE UNITS WERE DOWN FOR AN EXTENDED PERIOD IN LATE JANUARY.

                          THERE  IS EVIDENCE THAT THE SULFUR CONTENT IN THE COAL IS INCREASING AS THE
                          MATERIAL IS MINED DEEPER.  IF THE SULFUR CONTENT CONTINUES TO INCREASE
                          ADDITIONAL SCRUBBER TOWERS MAY HAVE TO BE INSTALLED.

  2/79  SYSTEM                                                                672

  3/79  SYSTEM                                                                744

  4/79  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         UNIT 1  IS NOW IN FULL OPERATION ALTHOUGH A SLUDGE DISPOSAL PROBLEM STILL
                         EXISTS.

                         THE UTILITY HAS REPLACED THE LOUVER DAMPERS WITH GUILLOTINE DAMPERS WHICH
                         SEEM TO WORK BETTER.  HOWEVER, THEY STILL HAVE PROBLEMS WITH THE GUIL-
                         LOTINE  DAMPERS FAILING TO SEAL WHEN THEY BECOME SCALED.

                         THERE HAVE BEEN REPORTS OF TOWER LEAKS RESULTING FROM  LINER FAILURE BUT
                         THE PROBLEM IS NOT SERIOUS.

  5/79  SYSTEM                                                                744

  6/79  SYSTEM                                                                720
                                             13-1216

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TEXAS UTILITIES: MARTIN LAKE i (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SLUDGE DISPOSAL SYSTEM IS STILL CAUSING SOME OPERATING PROBLEMS.  THE
                         PROBLEMS REPORTED LAST QUARTER WERE CAUSED BY HEAVY RAINS WHICH FORCED
                         THE THICKENERS OUT OF SERVICE.

                         THE FGD SYSTEM OPERATED THROUGHOUT MOST OF THE REPORT PERIOD.

 7/79  SYSTEM                                                                744

 8/79  SYSTEM                                                                744

 9/79  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         ENGINEERING WORK IS IN PROGRESS TO ADD TWO NEW SCRUBBING TOWERS TO EACH
                         MARTIN LAKE UNIT.  THIS IS BEING DONE FOR THREE REASONS:
                             1) THE LIGNITE CURRENTLY DELIVERED HAS A GREATER SULFUR CONTENT THAN
                                THAT FOR WHICH THE FGD SYSTEM WAS ORIGINALLY DESIGNED.
                             2) THE BOILER FLUE GAS FLOW IS GREATER THAN THAT FOR WHICH THE FGD
                                SYSTEM WAS ORIGINALLY DESIGNED.
                             3) AS A RESULT OF CURRENT FGO SYSTEM MAINTENANCE REQUIREMENTS THE
                                UTILITY FEELS IT IS BEST THAT ONE SPARE MODULE BE AVAILABLE SO THAT
                                AT LEAST ONE CAN BE DOWN FOR CLEANING AT ALL TIMES.
                         THE TWO NEW TOWERS FOR EACH UNIT WILL BE DESIGNED FOR A LARGER CAPACITY
                         THAN THE ORIGINAL TOWERS.

                         DURING THE THIRD QUARTER THE UTILITY REPORTED THE SYSTEM OPERATED WELL.
                         HOWEVER EXCESSIVE MAINTENANCE WAS REQUIRED.  THE SLUDGE DISPOSAL SYSTEM
                         PROBLEMS PLAGUING THE UNIT HAVE BEEN SOLVED.

 10/79  SYSTEM                                                                744

 11/79  SYSTEM                                                                720

 12/79  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         PLUGGING PROBLEMS HAVE BEEN ENCOUNTERED DURING THE FOURTH QUARTER REQUIRING
                         HEAVY MAINTENANCE.

 1/80  SYSTEM                                                                744

 2/80  SYSTEM                                                                696

 3/80  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         PLUGGING PROBLEMS CONTINUED IN THE FIRST QUARTER OF 1980, PARTICULARLY  IN
                         THE WETTED FILM CONTACT AREA AND THE MIST  ELIMINATOR SECTION.  THE
                         MIST ELIMINATOR PLUGGING WAS RECENTLY SOLVED BY SWITCHING BACK TO LAKE
                         WATER FOR MIST ELIMINATOR WASH FROM AN ASH POND WATER WASH THE UTILITY
                         HAD BEEN TESTING.

                         THE FRP STRUCTURAL WORK IS BECOMING A PROBLEM.  MUCH OF THE  FRP  SUPPORT
                         WORK HAS HAD TO BE REPLACED WITH STAINLESS STEEL.

                         THE UTILITY HAS PLANS TO INSTALL TWO NEW SCRUBBING TOWERS IN EARLY  1982.
                         THE NEW TOUERS HAVE BECOME NECESSARY DUE TO THE INCREASING LIGNITE
                         SULFUR CONTENT AND THE NEED FOR SPARE SCRUBBER CAPACITY.
                                             13-1217

-------
UTILITY FSO SURVEY'- OCTOBER 1983 - SEPTEMBER

TEXAS UTILITIES: MARTIN LAKE i (CONT.)
- ----------------------------------------- PERFORMANCE DATA ------------------------------------------
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
       SYSTEM                                                                720

 5/80  SYSTEM                                                                744

 6/80  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         HIGH MAINTENANCE PROBLEMS REPORTED IN PREVIOUS MONTHS CONTINUED THROUGHOUT
                         THE SECOND QUARTER OF 1980.  THE ABSORBERS ARE STILL EXPERIENCING PLUGGING
                         PROBLEMS.

 7/80  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         CORROSION IN THE SCRUBBER MODULES WAS A PROBLEM DURING JULY.

                         THE FOUNDATION FOR THE TWO NEW SCRUBBING TOWERS WAS COMPLETED DURING THE
                         MONTH.

 8/80  SYSTEM                                                                744

 9/80  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE FGD SYSTEM OPERATED WITHOUT ANY MAJOR
                         PROBLEMS DURING AUGUST AND SEPTEMBER.

 10/80  SYSTEM                                                                744

 11/80  SYSTEM                                                                720

 12/80  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO OPERATIONAL PROBLEMS WERE REPORTED FOR THE MARTIN LAKE 1 FGD SYSTEM
                         DURING THE FOURTH QUARTER 1980.

 1/81  SYSTEM                                                                744

 2/81  SYSTEM                                                                672

 3/81  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO OPERATIONAL PROBLEMS WERE REPORTED FOR THE MARTIN LAKE 1 FGD SYSTEM
                         DURING THE FIRST QUARTER OF 1981.  MAINTENANCE WORK IS CONTINUING
                         ON THE NEW ABSORBER MODULES.

 4/81  SYSTEM                                                                720

 5/81  SYSTEM                                                                744

 6/81  SYSTEM                                                                720
                                             13-1218

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

TEXAS UTILITIES: MARTIN LAKE i (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       *» PROBLEMS/SOLUTIONS/COMMENTS

                         NO OPERATIONAL PROBLEMS WERE REPORTED FOR THE MARTIN LAKE 1 FGD SYSTEM
                         DURING THE SECOND QUARTER 1961.  UTILITY IS STILL IN PROCESS OF ADDING
                         TWO ADDITIONAL ABSORBER MODULES (1 ADDITIONAL TRAIN) TO PRESENT FGD SYSTEM
                         DUE TO EXCESSIVE SULFUR CONTENT OF PRESENT LIGNITE COAL SOURCE.

 7/81  SYSTEM                                                                744

 8/81  SYSTEM                                                                744

 9/81  SYSTEM                                                                720

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         WORK CONTINUED DURING THE THIRD QUARTER 1981 ON THE INSTALLATION OF THE
                         ADDITIONAL ABSORBER TRAIN. THE INSTALLATION IS EXPECTED TO BE COMPLETED BY
                         THE SPRING OF 1982.

 10/81  SYSTEM                                                                744

 11/81  SYSTEM                                                                720

 12/81  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         WORK CONTINUED DURING THE FOURTH QUARTER 1981 ON THE INSTALLATION OF THE
                         ADDITIONAL ABSORBER TRAIN.  UNTIL THE ADDITIONAL MODULE IS ADDED, THE
                         UNIT WILL BE OPERATED AT REDUCED LOAD.

  1/82  SYSTEM                                                                744

  2/82  SYSTEM                                                                672

  3/82  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         WORK CONTINUED DURING THE FIRST QUARTER 1982 ON THE INSTALLATION OF THE
                         ADDITIONAL ABSORBER TRAIN.  THE ADDITIONAL TRAIN IS NOW SCHEDULED TO
                         START-UP IN JUNE.

  4/82  SYSTEM                                                                720

  5/82  SYSTEM                                                                744

  6/82  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE SECOND QUARTER THE UNIT WAS  TAKEN OFF-LINE  FOR  THE  ANNUAL  SPRING
                         OUTAGE.  DURING THIS TIME THE ADDITIONAL ABSORBER  TRAIN WAS  TIED  INTO THE
                         SYSTEM.

  7/82  SYSTEM                                                                744

  8/82  SYSTEM                                                                 744

  9/62  SYSTEM                                                                 720

 10/82  SYSTEM                                                                 744

 11/82  SYSTEM                                                                 720
                                             13-1219

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

TEXAS UTILITIES; MARTIN LAKE i (CONT.)
	PERFORMANCE DATA-	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL    PER  BOILER   FGD   CAP.
                                                                SOZ  PART. HOURS HOURS   HOURS  FACTOR


12/82  SYSTEM                                                                 744

 1/83  SYSTEM                                                                 744

 2/83  SYSTEM                                                                 672

 3/83  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE PAST NINE MONTHS THE MARTIN LAKE SYSTEMS EXPERIENCED  SCALING
                         AND PLUGGING PROBLEMS WITH MIST ELIMINATORS AND SPRAY PACKED TOWERS.
                         THE UTILITY IS PRESENTLY TESTING FORCED OXIDATION AS A POSSIBLE  SOLUTION.

                         THE MARTIN LAKE SYSTEMS ARE ALSO HAVING LINER FAILURES IN THEIR  SPRAY
                         PACKED TOWERS.

 4/83  SYSTEM                                                                 720

 5/83  SYSTEM                                                                 744

 6/83  SYSTEM                                                                 720

       #» PROBLEMS/SOLUTIONS/COMMENTS

                         A TOTAL OF 34,600 MAN-HOURS WERE SPENT ON THE MARTIN LAKE FGD SYS-
                         TEMS DURING THE MONTHS OF MAY AND  JUNE ALONE FOR SERVICING AND THE IMPLE-
                         MENTATION OF VARIOUS TEST PROGRAMS.

                         ABSORBER TOWERS WERE UPGRADED BY THE ADDITION OF FLOWRATE INSTRUMENTATION.

                         FLOW VANES WERE INSTALLED AT THE INLET OF THE ABSORBERS TO BETTER GAS DIST-
                         RIBUTION.

                         UTILITY IS CONDUCTING WET/DRY INTERFACE CORROSION TESTS IN THEIR BYPASS
                         DUCTING FOR RESEARCH-COTTRELL.

                         THE UTILITY CONTINUED TO REPORT PROBLEMS WITH ABSORBER LINING FAILURES AMD
                         MIST ELIMINATOR PLUGGING.  THE UTILITY IS PRESENTLY CONDUCTING MIST ELIM-
                         INATOR WASH, FORCED OXIDATION, AND  LINER TEST PROGRAMS TO HELP SOLVE THESE
                         TWO MAJOR PROBLEMS AREAS.

 7/83  SYSTEM                                                                 744

 8/83  SYSTEM                                                                 744

 9/83  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE MARTIN LAKE FGD SYSTEMS STILL  CONTINUE TO HAVE  MATERIALS OF  CONSTRUC-
                         TION AND SYSTEM CHEMISTRY PROBLEMS.  EPRI AND RADIAN ARE CURRENTLY DOING A
                         JOINT STUDY ON THE MARTIN LAKE SYSTEMS TO DETERMINE POSSIBLE SOLUTIONS TO
                         THESE PROBLEM AREAS.

10/83  SYSTEM                                                                 744.

11/83  SYSTEM                                                                 720

12/83  SYSTEM                                                                 744
                                             13-1220

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

TEXAS UTILITIES: MARTIN LAKE i 
-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGO SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - V.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
     NUMBER
     TYPE

 ** ESP
     NUMBER
     NUMBER OF SPARES
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

**» FGD SYSTEM
                  .100 LB/MMBTU)
                  .200 LB/MMBTU)
               (****** LB/MMBTU)
TEXAS UTILITIES
MARTIN LAKE
2
TATUM
TEXAS
D
   43.
  516.
******
 3000
  793
  750
  760
  595
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
 1494.51       (3167000 ACFM)
  168.3        (  335 F)
  137.         (  450 FT)
CONCRETE
*******        (***** FT)
               (   7380 BTU/LB)
                6972-7894
COAL
LIGNITE
17166.

********
8.0-12.0
   33.00
29.0-37.9
     .90
0.7-1.5
********
******
 0
NONE
 1
 0
COLD SIDE
RESEARCH-COTTRELL
 1494.5        (3167000 ACFM)
  168.3        (   335 F)
     .5        (   2. IN-H20)
   99.4
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                             13-1222

-------
TEXAS UTILITIES: MARTIN LAKE 2 CCONT.)
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
 »* GENERAL DATA
     SALEABLE PRODUCT/THROMAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - V.
     ENERGY CONSUMPTION - 7.
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 »* DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - 7.

 ** GUENCHER/PRESATURATOR
     NUMBER
     TYPE
     SUPPLIER
     INLET GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 »* ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE HAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINSR MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     DISTANCE BETWEEN GAS CONTACTING ZONES - CM
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     S02 REMOVAL EFFICIENCY - 7.

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     PRESSURE DROP - KFA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     MASH MATER SOURCE
     WASH RATE - L/S
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIMESTONE
 NONE
 RESEARCH-COTTRELL
 C.T. MAIN
 FULL SCALE
 NEW
7.   99.40
    71.00
     1.3
  1
  5/78
  5/78
  5/76
     1.50
 CYCLONIC SPRAY CHAMBER
 RESEARCH-COTTRELL
   168.3        (   335 F)
 CARBON STEEL
 AISI 1110
  6
  0
 COMBINATION TOWER
 SPRAY/PACKED
 N/A
 RESEARCH-COTTRELL
 28 DIA X 100 HIGH
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 GLASS FLAKE-FILLED POLYESTER
 FLAKELINE 103
 VERTICAL CROSS CHANNEL FIXED GRID PACKING
  4
                (   36.0IN)
                ( 99.9 GAL/1000 ACF)
91.4
13.4
 1.1
 2.7
95.0
                ( 4.5 IN-H20)
                (  9.0 FT/S)
 PRIMARY COLLECTOR
  6
  0
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 HORIZONTAL
     2
     3
      .2        (
     2.4        (
 ORGANIC
 POLYPROPYLENE
 FRESH
     7.9
              1.0 IN-H20)
               8.0 FT/S)
            (   126 GAL/MIN)
                                             13-1223

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
TEXAS UTILITIES: MARTIN LAKE 2 (CONT.)
 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     PERCENT GAS BYPASSED - AVG
     TEMPERATURE INCREASE - C
     INLET FLUE GAS TEMPERATURE - C
     OUTLET FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION .MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
BYPASS
COLD SIDE
N/A
   25.0
   22.2
   60.0
   82.2
NR
NR
(    40 F)
(   140 F)
(   180 F)
CENTRIFUGAL
UNIT
FORCED DRAFT
DRY
  375.48
  168.3
CARBON STEEL
(  795680 ACFM)
(   335 F)
 6
LOUVER
NR
MOSSER; FORNEY ENGINEERING
CARBON STEEL
AISI 1110
NONE
N/A
 6
LOUVER
NR
MOSSER
CARBON STEEL
AISI 1110
STAINLESS STEEL
AUSTENITIC
 1
LOUVER
NR
NR
CARBON STEEL
AISI 1110
STAINLESS STEEL
AUSTENITIC
 4
LOUVER
NR
NR
CARBON STEEL
AISI 1110
NONE
N/A
 4
LOUVER
NR
NR
CARBON STEEL
AISI 1110
NONE
N/A
                                            13-1224

-------
TEXAS UTILITIES: MARTIN LAKE z 
-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
TEXAS UTILITIES; MARTIN LAKE 2 
-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
TEXAS UTILITIES: MARTIN LAKE 2 CCONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


11/78  SYSTEM                                                                720

       *« PROBLEMS/SOLUTIONS/COMMENTS

                          COMPLIANCE TEST RESULTS ARE STILL BEING REVIEWED AND RESULTS ARE NOT YET
                          AVAILABLE.

12/78  SYSTEM                                                                744

 1/79  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          COAL HANDLING WAS A SERIOUS PROBLEM DUE TO FREEZING OF THE COAL IN THE
                          HOPPERS.  THIS PROBLEM EFFECTED ALL UNITS AT MARTIN LAKE FORCING THE
                          UTILITY'S GAS AND OIL UNITS TO CARRY THE LOAD.  ALL OF THE MARTIN LAKE
                          UNITS WERE DOWN FOR AN EXTENDED PERIOD IN LATE JANUARY.

                          THE FGD UNIT REPORTEDLY FUNCTIONED ACCEPTABLY WHEN OPERATED DURING
                          DECEMBER AND JANUARY.

                          THE FGD SYSTEM WAS SHUT DOWN WHILE THE BOTTOM ASH POND WAS CLEANED OUT.
                          THE UTILITY HAS BEEN DUMPING SLUDGE INTO THE BOTTOM ASH POND WHICH WAS
                          DESIGNED FOR BOTTOM ASH ONLY.  ALSO SLUDGE IS PRODUCED FASTER THAN IT CAN
                          BE REMOVED BY RAIL CAR.  THE ACTUAL PROBLEM IS REPORTEDLY IN THE DEWATER-
                          ING SYSTEM.  HEAVY RAIN FALL HAS AGGREVATED THE SLUDGE DISPOSAL PROBLEM
                          BY FOULING THE THICKENER OPERATIONS AND BY THREATENING POND OVERFLOW.

                          SOME MIST ELIMINATOR PROBLEMS WERE ENCOUNTERED DURING DECEMBER AND
                          JANUARY.

                          THERE IS EVIDENCE THAT THE SULFUR CONTENT IN THE COAL IS INCREASING AS
                          THE MATERIAL IS MINED DEEPER.  IF THE SULFUR CONTENT CONTINUES TO INCREASE
                          ADDITIONAL SCRUBBER TOWERS MAY HAVE TO BE INSTALLED.

  2/79  SYSTEM                                                                672

  3/79  SYSTEM                                                                7**

  */79  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTS THAT OPERATIONAL PROBLEMS HAVE INCLUDED ABSORBER
                         LINER FAILURES AND TOWER LEAKS.

                         UNIT 2 IS NOW IN FULL OPERATION ALTHOUGH A SLUDGE DISPOSAL PROBLEM STILL
                         EXISTS.

                         THE UTILITY HAS REPLACED THE LOUVER DAMPERS WITH GUILLOTINE DAMPERS WHICH
                         SEEM TO WORK BETTER.  HOWEVER, THEY STILL HAVE PROBLEMS WITH THE GUIL-
                         LOTINE DAMPERS FAILING TO SEAL WHEN THEY BECOME SCALED.

  5/79  SYSTEM                                                                7W

  6/79  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE SLUDGE DISPOSAL SYSTEM IS STILL CAUSING SOME OPERATING PROBLEMS.  THE
                         PROBLEMS REPORTED LAST QUARTER WERE CAUSED BY HEAVY RAINS WHICH  FORCED
                         THE THICKENERS OUT OF SERVICE.
                                             13-1227

-------
UTILITY FGD SURVEY'• OCTOBER 1983 - SEPTEMBER 1984
TEXAS UTILITIES: MARTIN LAKE 2 (CONT.)
	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                         THE FGD SYSTEM OPERATED THROUGHOUT MOST OF THE PERIOD.

 7/79  SYSTEM                                                                744

 8/79  SYSTEM                                                                744

 9/79  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         ENGINEERING WORK IS IN PROGRESS TO ADD TWO NEW SCRUBBING TOWERS TO EACH
                         MARTIN LAKE UNIT.  THIS IS BEING DONE FOR THREE REASONS:
                             1) THE LIGNITE CURRENTLY DELIVERED HAS A GREATER SULFUR CONTENT THAN
                                THAT FOR WHICH THE FGD SYSTEM WAS ORIGINALLY DESIGNED.
                             2) THE BOILER FLUE GAS FLOW IS GREATER THAN THAT FOR WHICH THE FGD
                                SYSTEM WAS ORIGINALLY DESIGNED.
                             3) AS A RESULT OF CURRENT FGD SYSTEM MAINTENANCE REQUIREMENTS THE
                                UTILITY FEELS IT IS BEST THAT ONE SPARE MODULE BE AVAILABLE SO THAT
                                AT LEAST ONE CAN BE DOWN FOR CLEANING AT ALL TIMES.
                         THE TWO NEW TOWERS FOR EACH UNIT WILL BE DESIGNED FOR A LARGER CAPACITY
                         THAN  THE ORIGINAL TOWERS.

                         DURING THE THIRD QUARTER THE UTILITY REPORTED THE SYSTEM OPERATED WELL.
                         HOWEVER EXCESSIVE MAINTENANCE WAS REPORTED.  THE SLUDGE DISPOSAL SYSTEM
                         PROBLEMS PLAGUING THE UNIT WERE SOLVED.

 10/79  SYSTEM                                                                744

 11/79  SYSTEM                                                                720

 12/79  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         PLUGGING PROBLEMS HAVE BEEN ENCOUNTERED DURING THE FOURTH QUARTER REQUIRING
                         HEAVY MAINTENANCE.

  1/80  SYSTEM                                                                744

  2/80  SYSTEM                                                                696

  3/80  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         PLUGGING PROBLEMS CONTINUED IN THE FIRST QUARTER OF 1980, PARTICULARLY IN
                         THE WETTED FILM CONTACT AREA AND THE MIST ELIMINATOR SECTION.  THE
                         MIST  ELIMINATOR PLUGGING WAS RECENTLY SOLVED BY SWITCHING BACK TO LAKE
                         WATER FOR MIST ELIMINATOR WASH FROM AN ASH POND WATER WASH THE UTILITY
                         HAD BEEN TESTING.

                         THE FRP STRUCTURAL WORK IS BECOMING A PROBLEM.  MUCH OF THE FRP SUPPORT
                         WORK  HAS HAD TO BE REPLACED WITH STAINLESS STEEL.

                         THE UTILITY HAS PLANS TO INSTALL TWO NEW SCRUBBING TOWERS IN  EARLY 1983.
                         THE NEW TOWERS HAVE BECOME NECESSARY DUE TO THE INCREASING LIGNITE SULFUR
                         CONTENT AND THE NEED FOR SPARE SCRUBBER CAPACITY.

  4/80  SYSTEM                                                                720

  5/80  SYSTEM                                                                744

  6/80  SYSTEM                                                                720
                                             13-1228

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*
TEXAS UTILITIES: MARTIN LAKE 2 ICONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  '/. REMOVAL   PER  BOILER  F60   CAP.
                                                                SOS  PART. HOURS HOURS  HOURS FACTOR


       *« PROBLEMS/SOLUTIONS/COMMENTS

                         HIGH MAINTENANCE PROBLEMS REPORTED IN PREVIOUS MONTHS CONTINUED THROUGHOUT
                         THE SECOND QUARTER OF 1980.  THE ABSORBERS ARE STILL EXPERIENCING PLUGGING
                         PROBLEMS.

 7/80  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         CORROSION IN THE SCRUBBER MODULES WAS A PROBLEM DURING JULY.

                         THE FOUNDATION FOR THE TWO NEW SCRUBBING TOWERS WAS COMPLETED DURING THE
                         MONTH.

 8/80  SYSTEM                                                                744

 9/80  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE FGD SYSTEM OPERATED WITHOUT ANY MAJOR
                         PROBLEMS DURING AUGUST AND SEPTEMBER.

 10/80  SYSTEM                                                                744

 11/80  SYSTEM                                                                720

 12/80  SYSTEM                                                                744

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         NO OPERATIONAL PROBLEMS WERE REPORTED FOR THE MARTIN LAKE 2 FGD SYSTEM
                         DURING THE FOURTH QUARTER 1980.

  1/81  SYSTEM                                                                744

  2/81  SYSTEM                                                                672

  3/81  SYSTEM                                                                744

       *« PROBLEMS/SOLUTIONS/COMMENTS

                         NO OPERATIONAL PROBLEMS WERE REPORTED FOR THE MARTIN LAKE 2 FGD SYSTEM
                         DURING THE FIRST QUARTER OF 1981.  MAINTENANCE WORK IS CONTINUING
                         ON THE NEW ABSORBER MODULES.

  4/81  SYSTEM                                                                720

  5/81  SYSTEM                                                                744

  6/81  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO OPERATIONAL PROBLEMS WERE REPORTED FOR THE MARTIN LAKE 2 FGD SYSTEM
                         DURING THE SECOND QUARTER 1981.  UTILITY  IS STILL  IN PROCESS  OF ADDING
                         TWO ADDITIONAL ABSORBER MODULES  (1 ADDITIONAL TRAIN) TO  PRESENT FGD SYSTEM
                         DUE TO EXCESSIVE SULFUR CONTENT  OF PRESENT  LIGNITE COAL  SOURCE.

  7/81  SYSTEM                                                                744

 8/81  SYSTEM                                                                744
                                             13-1229

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TEXAS UTILITIES: MARTIN LAKE z 
-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
TEXAS UTILITIES: MARTIN LAKE 2 JCONT.J
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  "/. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE PAST NINE MONTHS THE MARTIN LAKE SYSTEMS EXPERIENCED SCALING
                         AND PLUGGING PROBLEMS WITH MIST ELIMINATORS AND SPRAY PACKED TOWERS.
                         THE UTILITY IS PRESENTLY TESTING FORCED OXIDATION AS A POSSIBLE SOLUTION.

                         THE MARTIN LAKE SYSTEMS ARE ALSO HAVING LINER FAILURES IN THEIR SPRAY
                         PACKED TOWERS.

 4/83  SYSTEM                                                                720

 5/83  SYSTEM                                                                744

 6/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A TOTAL OF 34,600 MAN-HOURS WERE SPENT ON THE MARTIN LAKE FGD SYS-
                         TEMS DURING THE MONTHS OF MAY AND JUNE ALONE FOR SERVICING AND THE IMPLE-
                         MENTATION OF VAROUS TEST PROGRAMS.

                         ABSORBER TOWERS WERE UPGRADED BY THE ADDITION OF FLOWRATE INSTRUMENTATION.

                         FLOW VANES WERE INSTALLED AT THE INLET OF THE ABSORBERS TO BETTER GAS DIST-
                         RIBUTION.

                         UTILITY IS CONDUCTING WET/DRY INTERFACE CORROSION TEST IN THEIR BYPASS
                         DUCTING FOR RESEARCH-COTTRELL.

                         THE UTILITY CONTINUED TO REPORT PROBLEMS WITH ABSORBER LINING FAILURES AND
                         MIST ELIMINATOR PLUGGING.  THE UTILITY IS PRESENTLY CONDUCTING MIST ELIM-
                         INATOR WASH, FORCED OXIDATION, AND  LINER TEST PROGRAMS TO HELP SOLVE THESE
                         TWO MAJOR PROBLEMS AREAS.

  7/83  SYSTEM                                                                744

  8/83  SYSTEM                                                                744

  9/83  SYSTEM                                                                720

       ** PRCBLEMS/SOLUTIONS/COMMENTS

                         THE MARTIN  LAKE FGD SYSTEMS STILL CONTINUE TO HAVE MATERIALS OF CONSTRUC-
                         TION AND SYSTEM CHEMISTRY PROBLEMS.  EPRI AND RADIAN ARE CURRENTLY  DOING A
                         JOINT STUDY ON THE MARTIN LAKE SYSTEMS TO DETERMINE POSSIBLE SOLUTIONS TO
                         THESE PROBLEM AREAS.

 10/83  SYSTEM                                                                744

 11/83  SYSTEM                                                                720

 12/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR  FGD-RELATED  PROBLEMS WERE ENCOUNTERED
                         DURING THE  FOURTH QUARTER OF 1983.

                         EPRI AND RADIAN TESTING WAS CONCLUDED DURING THE PERIOD.   THE  TEST  RESULTS
                         FROM THIS STUDY ARE PENDING.

  1/84  SYSTEM                                                                744

  2/84  SYSTEM                                                                696
                                             13-1231

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TEXAS UTILITIES: MARTIN LAKE z (CONT.)
-------- . ---------------------------------- PERFORMANCE DATA ------------------------------------------
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
       SYSTEM                                                                744

 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                740

 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM PASSED PERFORMANCE TESTING CONDUCTED DURING THE PERIOD OF
                         MAY THROUGH AUGUST 1984.

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY CONTINUED TO EXPERIENCE MAINTENANCE PROBLEMS. TWO MODULES
                         ARE OUT OF SERVICE AT ALL TIMES FOR MAINTENANCE, HOWEVER, OVERALL FGD
                         SYSTEM PERFORMANCE IS NOT GREATLY EFFECTED.

                         NO MAJOR FGD-RELATED OUTAGES WERE REPORTED AT MARTIN LAKE 2 DURING THE
                         FIRST THREE QUARTERS OF 1984.
                                             13-1232

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
SOS EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY M/FGD - MM
NET UNIT GENERATING CAPACITY WO/FGO - MM
EQUIVALENT SCRUBBED CAPACITY - MM

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOH - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

 «** PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
     NUflSER
     TYPE

 »* ESP
     NUMBER
     NUMBER OF SPARES
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUSBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

 *** FGD SYSTEM
                  .100 LB/MMBTU)
                  .200 LB/MMBTU)
               (****** LB/MMBTU)
TEXAS UTILITIES
MARTIN LAKE
3
TATUM
TEXAS
D
   43.
  516.
******
 3000
  793
  750
  760
  595
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
 1494.51       (3167000 ACFM)
  168.3        (  335 F)
  137.         (  450 FT)
CONCRETE
«*****»        (***** FT)
               (   7380 BTU/LB)
                6972-7894
COAL
LIGNITE
17166.

********
8.0-12.0
   33.00
29.0-37.9
      .90
0.7-1.5
********
******
 0
NONE
 1
 0
COLD SIDE
RESEARCH-COTTRELL
 1494.5        (3167000 ACFM)
  168.3        (  335 F)
     .5        (2. IN-H20)
   99.4
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                             13-1233

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
TEXAS UTILITIES: MARTIN LAKE 3 (CONT.J
 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - Y.
     ENERGY CONSUMPTION - V.
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 «* DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - 7.

 ** QUENCHER/PRESATURATOR
     NUMBER
     TYPE
     SUPPLIER
     INLET GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 *« ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     DISTANCE BETWEEN GAS CONTACTING ZONES - CM
     L/G RATIO -  L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     502 REMOVAL  EFFICIENCY - 7.

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH RATE -  L/S
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIMESTONE
 NONE
 RESEARCH-COTTRELL
 C.T. MAIN
 FULL SCALE
 NEW
7.   99.40
    71.00
     1.3
  1
  2/79
  2/79
  5/76
     1.50
 CYCLONIC SPRAY CHAMBER
 RESEARCH-COTTRELL
   168.3        (  335 F)
 CARBON STEEL
 AISI 1110
 6
 0
COMBINATION TOWER
SPRAY/PACKED
N/A
RESEARCH-COTTRELL
23 DIA X 100 HIGH
CARBON STEEL
AISI 1110
N/A
ORGANIC
GLASS FLAKE-FILLED POLYESTER
FLAKELINE 103
VERTICAL CROSS CHANNEL FIXED GRID PACKING
 4
   91.*        (   36.0IN)
   13.4        ( 99.9 GAL/1000 ACF )
               ( 4.5 IN-H20)
               (9.0 FT/S)
     1.1
     2.7
    95.0
 PRIMARY COLLECTOR
  6
  0
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 HORIZONTAL
     2
     3
      .2        (
                  1.0 IN-H20)
                   8.0 FT/S)
 ORGANIC
 POLYPROPYLENE
 FRESH
     7.9
                                                                (   126  GAL/MIN)
                                             13-1234

-------
TEXAS UTILITIES: MARTIN LAKE 3 
-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
TEXAS UTILITIES: MARTIN LAKE 3 (CONT.)
 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER

 ** TANKS
     SERVICE
     ABSORBER RECYCLE
     PRESATURATOR/QUENCHER
     LIMESTONE SLURRY
     WET WELL
     MILL SLURRY SUMP

  **  PUMPS
     SERVICE
     QUENCHER  FEED
     SLURRY  FEED
     ABSORBER  RECIRCULATION
     ABSORBER  PACKING
     MILL SLURRY
     THICKENER UNDERFLOW
     MAIN WATER RECYCLE [THICKENER OVERFL
     AREA SUMP PUMPS

  »*  SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET  STREAM CHARACTERISTICS
     OUTLET  STREAM DISPOSITION
     OVERFLOW  STREAM DISPOSITION

  **  SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER  OF SPARES
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET  STREAM CHARACTERISTICS
INLET
CARBON STEEL
AISI 1110
NONE
N/A
OUTLET
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER
BYPASS
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER
WET BALL MILL
COMPARTMENTED
TUBE MILL
KENNEDY VAN SAUN
 4
                                                NUMBER
   3
   6
   1
   4
****
NUMBER

  12
   Z
   9
   9
   8
   3
   3
****
CENTRIFUGE
 3
THICKENER UNDERFLOW
35X SOLIDS
65X SOLIDS
TO FLY ASH MIXING
TO LIMESTONE SLURRY PREPARATION
THICKENER
 1
0
140.0 DIA X 12.0
CARBON STEEL IWALLSl; INORGANIC [BOTTOM]
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER  [WALLS]; MAT-REINFO
ABSORBER BLEED
10-12X SOLIDS
357. SOLIDS
                                            13-1236

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
TEXAS UTILITIES: MARTIN LAKE 3 CCONT.)

     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

*** SLUDGE

 «* TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS
     INLET QUALITY - 7.

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT

 ** PROCESS CONTROL AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     PHYSICAL VARIABLES

 *» MATER BALANCE
     WATER LOOP TYPE
     MAKEUP WATER ADDITION - LITERS/S

 »* CHEMICALS AND CONSUMPTION
     FUNCTION
     NAME
     PRINCIPAL CONSTITUENT
     UTILIZATION - •/.
     POINT OF ADDITION

 ** F6D SPARE CAPACITY INDICES
     ABSORBER - 7.

 ** FGD SPARE COMPONENT INDICES
     ABSORBER
                       TO CENTRIFUGE
                       TO LIMESTONE SLURRY PREPARATION
                       STABILIZATION
                       MULLER-TYPE BLENDER
                       NONE
                          65.0
                       FINAL
                       LANDFILL
                       ON-SITE
                       RAIL
                       NONE
                       PH
                       LIQUID LEVEL,  LIQUID ft GAS FLOW
                       CLOSED
                          34.6
                       ABSORBENT
                       LIMESTONE
                       95X CAC03
                          95.0
                       BALL MILL
                                      (   550 GPM)
 	;	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
  3/79  SYSTEM

  4/79  SYSTEM

       ** PPOBLEMS/SOLUTIONS/COMMENTS
                                                    744

                                                    720
                         MARTIN  LAKE UNIT 3 BECAME OPERATIONAL DURING MARCH.  NO OPERATIONAL DE-
                         TAILS WERE AVAILABLE.
  5/79  SYSTEM

  6/79  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
                                                    744

                                                    720
  7/79  SYSTEM

  8/79  SYSTEM
THE UNIT WAS IN OPERATION DURING THIS PERIOD ALTHOUGH OPERATIONAL DATA
WERE NOT AVAILABLE.

THE SLUDGE DISPOSAL SYSTEM IS EXPERIENCING SOME OPERATIONAL PROBLEMS.

                                                    744

                                                    744
                                             13-1237

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
TEXAS UTILITIES: MARTIN LAKE 3 (CONT.)
__	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR


 9/79  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         ENGINEERING WORK IS IN PROGRESS TO ADD TWO NEW SCRUBBING TOWERS  TO EACH
                         MARTIN  LAKE UNIT.  THIS IS BEING DONE FOR THREE REASONS:
                             1)  THE LIGNITE CURRENTLY DELIVERED HAS A GREATER SULFUR CONTENT THAN
                                 THAT FOR WHICH THE FGO SYSTEM WAS ORIGINALLY DESIGNED.
                             2)  THE BOILER FLUE GAS FLOW IS GREATER THAN THAT FOR WHICH THE FGD
                                 SYSTEM WAS ORIGINALLY DESIGNED.
                             3)  AS A RESULT OF CURRENT FGD SYSTEM MAINTENANCE REQUIREMENTS THE
                                 UTILITY FEELS IT IS BEST THAT ONE SPARE MODULE BE AVAILABLE SO THAT
                                 AT LEAST ONE CAN BE DOWN FOR CLEANING AT ALL TIMES.
                         THE TWO NEW TOWERS FOR EACH UNIT WILL BE DESIGNED FOR A LARGER CAPACITY
                         THAN THE ORIGINAL TOWERS.

                         DURING  THE THIRD QUARTER THE UTILITY REPORTED THAT THE FGO SYSTEM OPERATED
                         WITHOUT ANY MAJOR OPERATIONAL PROBLEMS, HOWEVER, EXCESSIVE MAINTENANCE WAS
                         REQUIRED.  THE SLUDGE DISPOSAL PROBLEMS PLAGUING THE UNIT HAVE BEEN SOLVED..

10/79  SYSTEM                                                                744

11/79  SYSTEM                                                                720

12/79  SYSTEM                                                                744

       #* PROBLEMS/SOLUTIONS/COMMENTS

                         PLUGGING PROBLEMS HAVE BEEN ENCOUNTERED DURING THE FOURTH QUARTER REQUIRING
                         HEAVY MAINTENANCE.

 1/80  SYSTEM                                                                744

 2/80  SYSTEM                                                                696

 3/80  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         PLUGGING PROBLEMS CONTINUED IN THE FIRST QUARTER OF 1980, PARTICULARLY IN
                         THE WETTED FILM CONTACT AREA AND THE MIST ELIMINATOR SECTION.  THE
                         MIST ELIMINATOR PLUGGING WAS RECENTLY SOLVED BY SWITCHING BACK TO LAKE
                         WATER FOR MIST ELIMINATOR WASH FROM AN ASH POND WATER WASH THE UTILITY
                         HAD BEEN TESTING.

                         THE FRP STRUCTURAL WORK IS BECOMING A PROBLEM.  MUCH OF THE FRP  SUPPORT
                         WORK HAS HAD TO BE REPLACED WITH STAINLESS STEEL.

                         THE UTILITY HAS PLANS TO INSTALL TWO NEW SCRUBBING TOWERS IN EARLY 1983.
                         THE NEW TOWERS HAVE BECOME NECESSARY DUE TO THE INCREASING LIGNITE SULFUR
                         CONTENT AND THE NEED FOR SPARE SCRUBBER CAPACITY.

 4/80  SYSTEM                                                                720

 5/80  SYSTEM                                                                744

 6/80  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         HIGH MAINTENANCE  PROBLEMS REPORTED IN PREVIOUS MONTHS CONTINUED  THROUGHOUT
                         THE SECOND QUARTER OF 1980.  THE ABSORBERS ARE STILL EXPERIENCING PLUGGING
                         PROBLEMS.
                                             13-1238

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
TEXAS UTILITIES: MARTIN LAKE 3 
-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER
TEXAS UTILITIES: MARTIN LAKE 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  '/. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       »* PROBLEMS/SOLUTIONS/COMMENTS

                         WORK CONTINUED DURING THE THIRD QUARTER 1981 ON THE INSTALLATION OF THE
                         ADDITIONAL ABSORBER TRAIN. THE INSTALLATION IS EXPECTED TO BE COMPLETED BY
                         THE FALL OF 1982.

10/81  SYSTEM                                                                744

11/81  SYSTEM                                                                720

12/81  SYSTEM                                                                744

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         WORK CONTINUED DURING THE FOURTH QUARTER 1981 ON THE INSTALLATION OF THE
                         ADDITIONAL ABSORBER TRAIN.  UNTIL THE ADDITIONAL MODULE IS ADDED, THE
                         UNIT WILL BE OPERATED AT REDUCED LOAD.

 1/82  SYSTEM                                                                74*

 2/82  SYSTEM                                                                672

 3/82  SYSTEM                                                                7*4

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         WORK CONTINUED DURING THE FIRST QUARTER 1982 ON THE INSTALLATION OF THE
                         ADDITIONAL ABSORBER TRAIN.

 4/82  SYSTEM                                                                720

 5/82  SYSTEM                                                                744

 6/82  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE SECOND QUARTER THE UNIT WAS TAKEN OFF-LINE FOR THE ANNUAL SPRING
                         OUTAGE.  DURING THIS TIME THE ADDITIONAL ABSORBER TRAIN WAS TIED INTO THE
                         SYSTEM.

 7/82  SYSTEM                                                                744

 8/82  SYSTEM                                                                744

 9/82  SYSTEM                                                                720

10/82  SYSTEM                                                                744

11/82  SYSTEM                                                                720

12/82  SYSTEM                                                                744

 1/83  SYSTEM                                                                744

 2/83  SYSTEM                                                                672

 3/83  SYSTEM                                                                744
                                            13-1240

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
TEXAS UTILITIES: MARTIN LAKE 3 ICONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE PAST NINE MONTHS THE MARTIN LAKE SYSTEMS EXPERIENCED SCALING
                         AND PLUGGING PROBLEMS WITH THEIR MIST ELIMINATORS AND SPRAY PACKED TOWERS.
                         THE UTILITY IS PRESENTLY TESTING FORCED OXIDATION AS A POSSIBLE SOLUTION.

                         THE MARTIN LAKE SYSTEMS ARE ALSO HAVING LINER FAILURES IN THEIR SPRAY
                         PACKED TOWERS.

 4/83  SYSTEM                                                                720

 5/83  SYSTEM                                                                744

 6/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A TOTAL OF 34,600 MAN-HOURS WERE SPENT ON THE MARTIN LAKE FGD SYS-
                         TEMS DURING THE MONTHS OF MAY AND JUNE ALONE FOR SERVICING AND THE IMPLE-
                         MENTATION OF VARIOUS TEST PROGRAMS.

                         ABSORBER TOWERS WERE UPGRADED BY THE ADDITION OF FLOWRATE INSTRUMENTATION.

                         FLOW VANES WERE INSTALLED AT THE INLET OF THE ABSORBERS TO BETTER GAS DIST-
                         RIBUTION.

                         UTILITY IS CONDUCTING WET/DRY INTERFACE CORROSION TESTS IN THEIR BYPASS
                         DUCTING FOR RESEARCH-COTTRELL.

                         THE UTILITY CONTINUED TO REPORT PROBLEMS WITH ABSORBER LINING FAILURES AND
                         MIST ELIMINATOR PLUGGING.  THE UTILITY IS PRESENTLY CONDUCTING MIST ELIM-
                         INATOR WASH, FORCED OXIDATION, AND LINER TEST PROGRAMS TO HELP SOLVE THESE
                         TWO MAJOR PROBLEMS AREAS.

 7/83  SYSTEM                                                                744

 8/83  SYSTEM                                                                744

 9/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE MARTIN LAKE FGD SYSTEMS STILL CONTINUE TO HAVE MATERIALS OF CONSTUC-
                         TION AND SYSTEM CHEMISTRY PROBLEMS.  EPRI AND RADIAN ARE CURRENTLY DOING  A
                         JOINT STUDY ON THE MARTIN LAKE SYSTEMS TO DETERMINE .POSSIBLE SOLUTIONS TO
                         THESE PROBLEM AREAS.

 10/83  SYSTEM                                                                744

 11/83  SYSTEM                                                                730

 12/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT 3 FGD SYSTEM WAS FORCED OFF-LINE DURING THE END OF NOVEMBER DUE
                         TO FREEZING PROBLEMS.  ALTHOUGH THE FGD SYSTEM WAS DOWN FOR APPROXIMATELY
                         2 DAYS, THE UNIT OPERATED DUE TO POWER SHORTAGES IN THE GRID.

                         EPRI AND RADIAN TESTING WAS CONCLUDED DURING THE PERIOD.  THE TEST RESULTS
                         FROM THIS STUDY ARE PENDING.

 1/84  SYSTEM                                                                744
                                             13-1241

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*
TEXAS UTILITIES: MARTIN LAKE 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR


 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM PASSED PERFORMANCE TESTING CONDUCTED DURING THE PERIOD OF
                         MAY THROUGH AUGUST 1984.

 9/84  SYSTEM                                                                720

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY CONTINUED TO EXPERIENCE MAINTENANCE PROBLEMS. TWO MODULES
                         ARE OUT OF SERVICE AT ALL TIMES FOR MAINTENANCE, HOWEVER, OVERALL FGD
                         SYSTEM PERFORMANCE IS NOT GREATLY EFFECTED.
                                                                          »

                         NO MAJOR FGD-RELATED OUTAGES WERE REPORTED AT MARTIN LAKE 3 DURING THE
                         FIRST THREE QUARTERS OF 1984.
                                             13-1242

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - '/.
     RANGE ASH CONTENT - 7.
     AVERAGE "MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

 *** PARTICLE CONTROL

 «* MECHANICAL COLLECTOR
     NUMBER
     TYPE

 ** ESP
     NUMBER
     NUMBER OF SPARES
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

 **» FGD SYSTEM
TEXAS UTILITIES
MONTICELLO
3
MT. PLEASANT
TEXAS
D
   43.         (
  516.         (
  301.         (
 1900
  800
  750
  495
  600
BABCOCK I WILCOX
PULVERIZED COAL
BASE
   .100 LB/MMBTU)
  1.200 LB/MMBTU)
   .700 LB/MMBTU)
 1650.71
  168.3
  183.
CONCRETE
*******
COAL
LIGNITE
*«***»

   18.90
******
   31.90
******
      .50
0.5-1.5
      .04
******
 0
NONE
 2
 0
COLD SIDE
C.E. WALTHER
  825.4
  168.3
      .4
    99.5
  0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
(3498000 ACFM)
(  335 F)
(  600 FT)

(***** FT)
(****** BTU/LB)
 6500-7500
(1749000 ACFM)
(  335 F)
(  Z. IN-H20)
                                             13-1243

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
TEXAS UTILITIES: MONTICELLO 3 ICONT.)
 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - 7.
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     OPER. i. MAINT. REQUIREMENT - MANHR/DAY

 ** QUENCHER/PRESATURATOR
     NUMBER

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE'
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - 7.
     PARTICLE REMOVAL EFFICENCY - 7.

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH FREQUENCY
     WASH RATE - L/S

 ** REHEATER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIMESTONE
 NONE
 GE ENVIRONMENTAL SERVICES
 C.T. MAIN
 FULL SCALE
 NEW
7.   99.50
    74.00
  1
 10/78
  5/78
  0/76
    92.0
  3
  0
 SPRAY TOWER
 OPEN COUNTERCURRENT SPRAY
 N/A
 GE ENVIRONMENTAL SERVICES
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 GLASS FLAKE-FILLED POLYESTER; MAT-REINFORCED POL
 FLAKELINE 103; CEILCRETE 2500AR
 NONE
  1
  4000.
     7.3
     3.0
   550.24
   168.3
    74.0
      .0
(63490 GPM)
(  54.5 GAL/1000 ACF)
(  2.0 IN-H20)
(  10.0 FT/S)
(1166000 ACFM)
(   335 F)
 PRIMARY COLLECTOR
  3
  0
  1
 IMPINGEMENT
 BAFFLE
 OPEN VANE [SLAT]
 HORIZONTAL
     1
     4
     3.0        ( 10.0 FT/S)
 ORGANIC
 POLYPROPYLENE
 FRESH
 CONTINUOUS/INTERMITTENT
    15.9        (  252 GAL/MIN)
  2
  0
 INDIRECT HOT AIR
 EXTERNAL HEAT EXCHANGER
 STEAM TUBE BUNDLE
                                            13-1244

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 - SEPTEMBER
TEXAS UTILITIES:  MONTICELLO 3 CCONT.)

     PERCENT GAS BYPASSED - AVG
     TEMPERATURE INCREASE - C
     INLET FLUE GAS FLOW RATE - CU. M/S
     INLET FLUE GAS TEMPERATURE - C
     OUTLET FLUE GAS FLOW RATE - CU. M/S
     OUTLET FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     GENERIC TYPE
     SPECIFIC TYPE
     MAHUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
    . CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 »* DAMPERS
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 *« DAMPERS
     GENERIC TYPE
     SPECIFIC TYPE
     MANUFACTURER
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** OUCTWOPK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 *» OUCTWOSK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE
50.0
10.0
1284.04
60.6
1588.46
70.6
CARBON STEEL
AISI 1110

( 18 F)
(2721000 ACFM)
( 141 F)
(3366100 ACFM)
( 159 F)


               (1166000 ACFM)
               (   335 F)
 3
 0
CENTRIFUGAL
BUFFALO FORGE
UNIT
FORCED DRAFT
DRY
  550.24
  168.3
CARBON STEEL
GUILLOTINE
NR
ANDCO
CARBON STEEL
AISI 1110
NONE
N/A
LOUVER
NR
NR
STAINLESS STEEL
AUSTENITIC
NONE
N/A
LOUVER
NR
NR
STAINLESS STEEL
AUSTENITIC
NONE
N/A
INLET
CARBON STEEL
AISI 1110
NONE
N/A
OUTLET
CARBON STEEL
AISI 1110
INORGANIC
HYDRAULICALLY-BONDED MORTAR
BYPASS
CARBON STEEL
AISI 1110
NONE
N/A
                                            13-1245

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
TEXAS UTILITIES; MONTICELLO 3 (CONT.)
 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     MANUFACTURER
     NUMBER
     NUMBER OF SPARES

 ** TANKS
     SERVICE
     REAGENT PREP PRODUCT
     ABSORBER RECYCLE
     502 REMOVAL AREA SUMP

 ** PUMPS
     SERVICE
     ABSORBER RECIRCUUTION
     SLURRY FEED
     CLEAR WATER PUMPS
     SUMP PUMP

  ** SOLIDS CONCENTRATING/DEMATERINS
     DEVICE

 *** SLUDGE

  ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

  ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT

  ** PROCESS CONTROL  AND INSTRUMENTATION
     CHEMICAL PARAMETERS
     PHYSICAL VARIABLES
     MONITOR TYPE

  ** WATER BALANCE
     WATER  LOOP TYPE
     MAKEUP WATER  ADDITION -  LITERS/S

  ** CHEMICALS AND  CONSUMPTION
     FUNCTION
     NAME

  ** FGD  SPARE CAPACITY INDICES
     ABS02BER - 7.

  ** FGD  SPARE COMPONENT INDICES
     ABSORBER
WET BALL MILL
KENNEDY VAN SAUN
 Z
 1
NUMBER
   1
   3
****
NUMBER

  IZ
****
****
**«*
NONE
STABILIZATION
POND
NONE
FINAL
POND
ON-SITE
PIPELINE
CLAY LINING
PH, S02 CONCENTRATION
DENSITY
UNILOC, DUPONT, K-RAY
CLOSED
   34.4
ABSORBENT
LIMESTONE
      .0


      .0
               (  546 GPM)
 	PERFORMANCE DATA	
 PERIOD  MODULE  AVAILABILITY  OPERABILITY RELIABILITY UTILIZATION   7. REMOVAL    PER   BOILER   FGD   CAP.
                                                                 S02   PART.  HOURS  HOURS   HOURS  FACTOR
  5/78   SYSTEM
                                                                              744
                                             13-1246

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
TEXAS UTILITIES: MONTICELLO 3 CCONT.)
------------------------------------------ PERFORMANCE DATA ------------------------------------------
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE TEXAS AIR CONTROL BOARD REPORTED THAT THE TEXAS UTILITIES 750 MW
                          MONTICELLO UNIT 3 BEGAN FGD OPERATIONS DURING EARLY MAY.  AS OF YET THE
                          UNIT HAS NOT RUN AT FULL LOAD BUT IS EXPECTED TO DO SO BY THE END OF
                          AUGUST.

 6/78  SYSTEM                                                                720

 7/78  SYSTEM                                                                744

       »* PROBLEMS/SOLUTIONS/COKMENTS

                          THE UNIT IS NOT AT FULL LOAD YET.  THE UNIT IS OPERATING AT NO MORE THAN
                          A 300 MW LOAD (OF THE 750 MM TOTAL).  ONE OF THE THREE FGD MODULES IS
                          FULLY OPERATIONAL.  ANOTHER ONE IS PARTIALLY OPERATIONAL, WHILE THE THIRD
                          IS NOT OPERATING AT ALL.

 8/78  SYSTEM                                                                744

 9/78  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE COMPLIANCE TEST HAS NOT YET TAKEN PLACE.  THE FGD SYSTEM IS OPERATION-
                          AL.  INSTRUMENTATION INDICATES THAT THE UNIT IS IN COMPLIANCE.

 10/78  SYSTEM                                                                744

 11/78  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          CONTINUOUS NOX, 02, AND S02 MONITORS ARE A PROBLEM AREA.

                          THE SLUDGE IS CURRENTLY NOT FIXATED.  IT IS BEING PUMPED DIRECTLY TO THE
                          THE  FGD SYSTEM  IS  FULLY OPERATIONAL.  A PRELIMINARY TEST WAS PERFORMED ON
                          DECEMBER  14.  RESULTS OF THE TEST ARE NOT YET AVAILABLE.

 12/78  SYSTEM                                                                744

  1/79  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                          THE  FGD SYSTEM  REPORTEDLY HAS  BEEN  PERFORMING WELL.

                          THE  ESP IS NOT  OPERATING WELL.   COLLECTION  EFFICIENCY IS UNEXPECTEDLY
                          LOW.  AMMONIA INJECTION HAS BEEN TRIED TO IMPROVE  REMOVAL  EFFICIENCY.
                          THE  PROBLEM REPORTEDLY IS THE  RESULT OF STRUCTURAL DAMAGE.  THE  UNIT DID
                          NOT  PASS  THE EPA OPACITY TEST.

  2/79  SYSTEM                                                                672

  3/79  SYSTEM                                                                744

  4/79  SYSTEM                                                                720
                                             13-1247

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
TEXAS UTILITIES: MONTICELLO 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT IS CURRENTLY DOWN FOR A SCHEDULED OVERHAUL.  THE TOWERS HAVE
                         BEEN INSPECTED AND NO SCALING WAS FOUND.

                         SOME MINOR RECYCLE PUMP LINER PROBLEMS HAVE BEEN REPORTED.

                         DUE TO HIGH ASH LEVELS SOME PLATES IN THE ESP WERE FORCED OUT OF
                         ALIGNMENT CAUSING AN OPACITY PROBLEM.

                         THE NEXT COMPLIANCE TEST IS SCHEDULED FOR THE WEEK OF JUNE 18.

  5/79  SYSTEM                                                                744

  6/79  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS IN OPERATION DURING THIS PERIOD ALTHOUGH OPERATIONAL DATA
                         WERE NOT AVAILABLE.

  7/79  SYSTEM                                                                744

  8/79  SYSTEM                                                                744

  9/79  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE ESP WAS REBUILT AND SINCE THE INITIATION OF GAS CONDITIONING WITH
                         AMMONIA THE OPACITY PROBLEM HAS BEEN MINIMIZED.

                         DURING THE THIRD QUARTER THE UNIT OPERATED WITHOUT ANY MAJOR PROBLEMS.
                         SOME MINOR ABSORBER RECYCLE PUMP LINER FAILURES HAVE BEEN ENCOUNTERED.  .

 10/79  SYSTEM                                                                744

 11/79  SYSTEM                                                                720

 12/79  SYSTEM                                                                744

       *# PROBLEMS/SOLUTIONS/COMMENTS

                         NO PROBLEMS HAVE BEEN ENCOUNTERED DURING THE FOURTH QUARTER.  SINCE GAS
                         CONDITIONING WITH AMMONIA BEGAN, THE OPACITY HAS BEEN ACCEPTABLE.

  1/80  SYSTEM                                                                744

  2/80  SYSTEM                                                                696

  3/80  SYSTEM                                                                744

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         NO PROBLEMS WERE ENCOUNTERED DURING THE FIRST QUARTER OF 1980.

  4/80  SYSTEM                                                                720

  5/80  SYSTEM                                                                744

  6/80  SYSTEM                                                                720
                                             13-1248

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
TEXAS UTILITIES: MONTICELLO 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE MONTICELLO 3 SCRUBBING SYSTEM PERFORMED WELL THROUGHOUT THE SECOND
                         QUARTER OF 1980.  THE TEXAS AIR CONTROL BOARD REPORTED THAT IT HAD RECEIVED
                         VERY FEW EXCESS EMISSIONS REPORTS FROM THE STATION DURING THE APRIL-JUNE
                         PERIOD.

 7/80  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED DURING JULY.

 8/80  SYSTEM                                                                744

 9/80  SYSTEM                                                                720

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE RECYCLE PUMP LININGS HAVE BEEN A CONTINUAL
                         PROBLEM DURING AUGUST AND SEPTEMBER.  AT ONE TIME DURING THE TWO MONTH
                         PERIOD THREE RECYCLE PUMP LINERS FAILED.

                         THE FGD SYSTEM HAS REPORTEDLY PERFORMED WELL AND IS IN COMPLIANCE MORE
                         THAN 95X OF THE TIME.

 10/80  SYSTEM                                                                744

 11/80  SYSTEM                                                                720

 12/80  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE MONTICELLO 3 FGD SYSTEM CONTINUED TO OPERATE DURING THE FOURTH
                         QUARTER I960 WITH NO MAJOR OPERATIONAL PROBLEMS REPORTED FOR THE THREE
                         MONTH PERIOD.

  1/81  SYSTEM                                                                744

  2/81  SYSTEM                                                                672

  3/81  SYSTEM                                                                744

       ** PROSLEMS/SOLUTIONS/COMMENTS

                         MINOR PROBLEMS WITH THE  RECYCLE  PUMP WERE  ENCOUNTERED THROUGHOUT THE  FIRST
                         QUARTER 1981.

  4/81  SYSTEM                                                                720

  5/81  SYSTEM                                                                744

  6/81  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO PROBLEMS WERE ENCOUNTERED DURING  THE  SECOND QUARTER  1981.   FGD  SYSTEM
                         PERFORMANCE WAS REPORTED AS BEING  VERY GOOD.

  7/81  SYSTEM                                                                744

 8/81  SYSTEM                                                                744
                                             13-1249

-------
UTILITY FGD SURVEY? OCTOBER 1983 - SEPTEMBER 1984
TEXAS UTILITIES: MONTICELLO 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL    PER  BOILER   FGD   CAP.
                                                                302   PART. HOURS HOURS  HOURS  FACTOR


 9/81  SYSTEM                                                                 720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         IT WAS REPORTED THAT NO MAJOR FGO-RELATED PROBLEMS  WERE ENCOUNTERED AT
                         MONTICELLO 3 DURING THE THIRD QUARTER 1981.

10/81  SYSTEM                                                                 744

11/81  SYSTEM                                                                 720

12/81  SYSTEM                                                                 744

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         NO PROBLEMS WERE ENCOUNTERED DURING THE FOURTH  QUARTER 1981.

 1/82  SYSTEM                                                                 744

 2/82  SYSTEM                                                                 672

 3/82  SYSTEM                                                                 744

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         NO FGD-RELATED  PROBLEMS WERE ENCOUNTERED DURING THE FIRST  QUARTER  1982.
                         FGD  PERFORMANCE WAS REPORTED AS  BEING UNUSUALLY VERY GOOD.

 4/82  SYSTEM                                                                 720

 5/82  SYSTEM                                                                 744

 6/82  SYSTEM                                                                 720

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR  FGD-RELATED PROBLEMS WERE ENCOUNTERED  DURING THE  SECOND QUARTER.

 7/82  SYSTEM                                                                 744

 8/82  SYSTEM                                                                 744

 9/82  SYSTEM                                                                 720

10/82  SYSTEM                                                                 744

11/82  SYSTEM                                                                 720

12/82  SYSTEM                                                                 744

 1/83  SYSTEM                                                                 744

 2/83  SYSTEM                                                                 672

 3/83  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         EXCEPT  FOR RECYCLE  PUMP FAILURES AND  PROBLEMS WITH  WATER CARRY-OVER  FROM
                         MIST ELIMINATORS, THE  FGD  SYSTEM OPERATED FLAWLESSLY THROUGHOUT  THE  NINE
                         MONTH PERIOD.   THE  APPROXIMATE  FGD SYSTEM AVAILABILITY FOR THIS  PERIOD  AS
                         REPORTED  BY THE TEXAS  AIR  CONTROL BOARD WAS  NEARLY  100X.

 4/83  SYSTEM                                                                 720
                                             13-1250

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER
TEXAS UTILITIES: MONTICELLO 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  '/. REMOVAL   PER  BOILER  F6D   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 5/83  SYSTEM                                                                744

 6/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         EXCEPT FOR THE CONTINUED PROBLEMS WITH RECYCLE PUMP LINER FAILURES, NO
                         MAJOR FGD-RELATED  PROBLEMS WERE  ENCOUNTERED THROUGHOUT THE PERIOD.

 7/83  SYSTEM                                                                744

 8/83  SYSTEM                                                                744

 9/83  SYSTEM                                                                720

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         EXCEPT FOR MIST  ELIMINATOR CARRYOVER PROBLEMS, NO MAJOR FGD-RELATED PROB-
                         LEMS WERE ENCOUNTERED  DURING THE THIRD PERIOD.

                         DUE TO EXCESSIVE CARRYOVER FROM  THE MIST ELIMINATORS, STACK CONDENSATE
                         COLLECTED TO THE EXTENT THAT THE WEIGHT OF THE WATER BLEW OPEN THE STACK
                         FLUE ACCESS DOOR.   ONLY MINOR  DAMAGE WAS REPORTED TO THE STACK AND RE-
                         PAIRS WERE COMPLETED WITHIN A  SINGLE DAY.  IT WAS REPORTED THAT THE CARRY-
                         OVER CONTAINED SLURRY  WHICH PLUGGED THE DRAINS LOCATED AT THE BASE OF THE
                         STACK.

 10/83  SYSTEM                                                                744

 11/83  SYSTEM                                                                720

 12/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIOHS/COMMENTS

                         THE MONTICELLO 3 FGD SYSTEM WAS  OFF-LINE 5 DAYS  IN DECEMBER FOR MIST
                         ELIMINATOR REPLACEMENT.  THE REPLACEMENT OF MIST ELIMINATORS  IN ALL
                         THREE SPRAY TOWERS WAS NECESSITATED DUE TO HARD  SCALE BUILD UP.   THE COST
                         TO REPLACE THE MIST ELIMINATORS  IN ALL THREE TOWERS WAS APPROXIMATELY
                         $300,000.  THE UTILITY BELIEVES  THIS WAS A ONE-TIME OCCURRENCE CAUSED BY AN
                         UNMONITORED PEAK IN THE SYSTEM CHEMISTRY.

 1/84  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                 720

 7/84  SYSTEM                                                                 744

 8/84  SYSTEM                                                                 744

 9/84  SYSTEM                                                                 720
                                             13-1251

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

TEXAS UTILITIES: MONTICELLO 3 
-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 198*
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MM
NET UNIT GENERATING CAPACITY WO/FGD - MM
EQUIVALENT SCRUBBED CAPACITY - MM

 «* UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOM - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 »* FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

 *«» PARTICLE CONTROL

 »* MECHANICAL COLLECTOR
     NUMBER
     TYPE

 »* FABRIC FILTER
     NUMBER
     SUPPLIER
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.
     TYPICAL GAS/CLOTH RATIO - M/MIN

 ** ESP
     NUMBER
     TYPE

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE
               (   .010 LB/MMBTU)
               (  1.200 LB/MMBTU)
               (»»**«* LB/MMBTU)
UNITED POMER ASSOCIATION
STANTON
1A
STANTON
NORTH DAKOTA
D
    4.
  516.
******
  187
   60
  495
  495
   50
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
   98.19       (
  132.2        (
   77.         (
CONCRETE
    4.6
                 208074 ACFM)
                 270 F)
                 254 FT)
               ( 15.0 FT)
               (  7000 BTU/LB)
                5976-7367
COAL
LIGNITE
16282.

    6.90
4.9-11.8
   35.00
28.0-37.9
      .77
0.3-1.9
********
******
 0
NONE
RESEARCH-COTTRELL
   76.7        ( 170 F)
    1.0        ( 4.0 IN-H20)
   99.0
      .5        (  1.6 FT/MIN)
 0
NONE
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                             13-1253

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

UNITED POWER ASSOCIATION: STANTON 1A (CONT.)
*** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     SOS REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 «* ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X
     PARTICLE REMOVAL EFFICENCY - X

 ** MIST ELIMINATOR
     FRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE
 THROWAWAY PRODUCT
 SPRAY DRYING
 LIME/SPRAY DRYING
 RESEARCH-COTTRELL
 BLACK & VEATCH
 FULL SCALE
 NEW
X   99.80
    72.70
  1
 11/82
  7/82
  1/80
 NR
 NR
  1
  0
 SPRAY DRYER
 NR
 ROTARY ATOMIZER
 KOMLINE & SANDERSON
 63.0 X 38.0 72.0
 CARBON STEEL
 AISI 1110
 N/A
 NONE
 N/A
 N/A
 NONE
  1
   13*.96       (
   161.7        (
    91.0
    99.8
286000 ACFM)
 323 F)
 NONE
  0
 N/A
 N/A
 N/A
 NR
 NR
  0
 NONE
 N/A
 N/A
 NONE
 N/A
 NR
 NR
 INDUCED DRAFT
 DRY
 CARBON STEEL
                                            13-1254

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
UNITED POWER ASSOCIATION: STANTON 1A (CONT.)
 »» DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 »* DUCTWORK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 *« REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 ** PUMPS
     SERVICE
     NR
  ** SOLIDS CONCENTRATING/DEWATERING
      DEVICE
      NUMBER

  ** SOLIDS COHCENTRATING/DEWATERING
      DEVICE
      NUMBER

  *« SOLIDS CONCENTRATING/DEWATERING
      DEVICE
      NUMBER

 *** SLUDGE

  ** TREATMENT
      METHOD
      DEVICE
      PROPRIETARY PROCESS

  ** DISPOSAL
      NATURE
      TYPE
      LOCATION
      SITE TRANSPORTATION METHOD
      SITE TREATMENT

  «* PROCESS  CONTROL AND INSTRUMENTATION
      PHYSICAL  VARIABLES
      PROCESS CONTROL MANNER
      PROCESS CHEMISTRY MODE

  ** WATER BALANCE
      WATER  LOOP TYPE
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
SLAKER
NR
NR
NUMBER

****
THICKENER
 0
VACUUM FILTER
 0
CENTRIFUGE
 0
N/A
N/A
N/A
 FINAL
 POND
 ON-SITE
 PIPELINE
 CLAY LINING
 TEMPERATURE.S02
 AUTOMATIC
 FEED  FORWARD
 OPEN
                                             13-1255

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

UNITED POWER ASSOCIATION: STANTON 1A (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  F6D   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 7/82  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM INITIAL STARTUP WAS IN JULY 1982 AND IS CURRENTLY STILL IN
                         THE SHAKEDOWN AND DEBUGGING PHASE OF OPERATION.

 8/82  SYSTEM                                                                744

 9/82  SYSTEM                                                                720

10/82  SYSTEM                                                                744

11/82  SYSTEM                                                                720

12/82  SYSTEM                                                                74*

 1/83  SYSTEM                                                                74*

 2/63  SYSTEM                                                                672

 3/83  SYSTEM                                                                7*4

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED EXPERIENCING A NUMBER OF PROBLEMS WITH ROTARY
                         ATOMIZERS.  GEAR BOXES HAVE BURNED OUT DUE TO BALANCING PROBLEMS AND MOTORS
                         HAVE NOT PROVIDED ADEQUATE ATOMIZATION.  THE FGD SYSTEM HAS YET TO COMPLETE
                         EITHER PERFORMANCE OR COMPLIANCE TESTING.

 4/83  SYSTEM                                                                720

 5/83  SYSTEM                                                                744

 6/83  SYSTEM                                                                720

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THE CANCELLATION OF ITS SCHEDULED JULY 11 PERFORM-
                         ANCE TEST BECAUSE OF ATOMIZER PROBLEMS.  THE NEW TENTATIVE DATE IS SCHED-
                         ULED FOR SOMETIME IN OCTOBER.  COMMERCIAL OPERATIONS ARE PLANNED TO TAKE
                         PLACE IN DECEMBER.

 7/83  SYSTEM       99.9       100.0       100.0        99.0                  744   737    737

 8/83  SYSTEM      100.0       100.0       100.0       100.0                  744   744    744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED DURING JULY AND AUGUST 1983.

 9/83  SYSTEM        2.9       100.0       100.0         2.8                  720    20     20

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT FREQUENT PLUGGING AT THE TOP OF THE ATOMIZERS OC-
                         CURRED DURING THE THIRD QUARTER.

                         THE UTILITY REPORTED A UNIT OUTAGE BEGINNING SEPTEMBER 1 AND CONTINUING
                         INTO OCTOBER.

10/83  SYSTEM       88.3       100.0       100.0        86.5                  744   643    744

11/83  SYSTEM       88.3       100.0       100.0        86.5                  720   622    720
                                             13-1256

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

UNITED POWER ASSOCIATION: STANTON 1A (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


12/83  SYSTEM      88.3       100.0       100.0        86.5                  744   643    744

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM MAS OUT OF SERVICE 258.5 HRS DURING THE FOURTH QUARTER OF
                         1983 DUE TO AN ANNUAL OUTAGE.

                                                                             744   689    689

                                                                             696   648    648

                                                                             744   689    689

                                                                             720   675    675

                                                                             744   696    696

                                                                             720   675    675

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS MERE REPORTED DURING THE FIRST TWO QUARTERS
                         OF 1984.

  7/84  SYSTEM                                                                744

  8/84  SYSTEM                                                                744

  9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION HAS  UNAVAILABLE  FOR THE THIRD QUARTER OF 1984.
1/84
2/84
3/84
4/84
5/84
6/84
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
93
94
93
99
99
99
.9
.5
.9
.9
.6
.9
100.
100.
100.
100.
100.
100.
0
0
0
0
0
0
100.
100.
100.
100.
100.
100.
0
0
0
0
0
0
92
93
92
93
93
93
.5
.1
.5
.8
.5
.8
                                             13-1257

-------
UTILITY FSD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC F6D SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/F6D - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW
UTAH POWER & LIGHT
HUNTER
1
CASTLE DALE
UTAH
C
43. ( .100
516. ( 1.200
301. ( .700
393
420
393
400
360






LB/MMBTU )
LB/MMBTU )
LB/MMBTU)





 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 #* FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RAUSE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

 *** PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
     NUMBER
     TYPE

 ** ESP
     NUMBER
     NUMBER OF SPARES
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

 *** FGD SYSTEM
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
  822.05       (1742000 ACFM)
  130.0        (  266 F)
  183.         (  600 FT)
CONCRETE
    7.3        (  24.0 FT)
               (  11500 BTU/LB)
                10000-12600
COAL
BITUMINOUS
26749.

   12.90
6.8-20.1
    7.60
3.6-16.9
      .52
0.41-0.90
********
******
 0
NONE
 2
 0
COLD SIDE
BUELL DIVISION, ENVIROTECH
  443.1        ( 939000 ACFM)
  127.8        (  262 F)
     .1        (  0. IN-H20)
   99.6
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                             13-1258

-------
UTAH POWER & LIGHT: HUNTER 1 (CONT.)
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 198*
 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 »» DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X
     DESIGN COAL HEAT CONTENT - J/G
     DESIGN COAL ASH CONTENT - X
     DESIGN MOISTURE CONTENT - X
     OPER. I MAINT. REQUIREMENT - MANHR/DAY

 »» QUENCHER/PRESATURATOR
     NUMBER

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     302 REMOVAL EFFICIENCY - X

 »» MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     FREEBOARD DISTANCE - M
     DISTANCE BETWEEN VANES - CM
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH FREQUENCY
     WASH RATE - L/S
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIME
 NONE
 GE ENVIRONMENTAL SERVICES
 STEARNS-ROGER
 FULL SCALE
 NEW
X   99.50
    60.00
     1.7
  1
  5/79
  3/79
 12/76
                (  12500 BTU/LB)
     .55
29075.0
    9.00
    6.00
  160.0
  4
  0
 SPRAY TOWER
 OPEN COUNTERCURRENT SPRAY
 N/A
 GE ENVIRONMENTAL SERVICES
 27.5 DIAMETER X 35.5 HIGH
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 GLASS FLAKE-FILLED POLYESTER
 NR
 NONE
  1
  1178.
     5.7
      .6
     3.7
   205.51
   130.0
    80.0
               (18700 GPM)
               (  42.9 GAL/1000 ACF)
               (  2.5 IN-H20)
               (  12.0 FT/S)
               ( 435500 ACFM)
               (  266 F)
 PRIMARY COLLECTOR

  0
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 HORIZONTAL
     1
     4
     3.66       (12.0 FT)
     7.6        ( 3.00 IN)
      .2        ( 1.0 IN-H20)
 ORGANIC
 POLYPROPYLENE
 FRESH & SUPERNATANT
 CONTINUOUS
     9.5        (  150 GAL/MIN)
                                             13-1259

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 198-4

UTAH POWER 4 LIGHT: HUNTER 1 (CONT.)
 ** REHEATER
     NUMBER
     NUMBER OF SPARES
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     PERCENT GAS BYPASSED - AVG
     TEMPERATURE INCREASE - C
     INLET FLUE GAS TEMPERATURE - C
     OUTLET FLUE GAS TEMPERATURE - C
     NUMBER OF HEAT EXCHANGER BANKS
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
 1
 0
 1
INDIRECT HOT AIR
EXTERNAL HEAT EXCHANGER
STEAM TUBE BUNDLE
   15.0
     .7        (   48 F)
               (  110 F)
               (  158 F)
   26.
   43.3
   70.0
   1
CARBON STEEL [HEADER!; STAINLESS STEEL ITUBESJJ
AISI 1110 ; NR; NR
 2
 0
WESTINGHOUSE
UNIT
FORCED DRAFT
DRY
CARBON STEEL
 2
 0
CENTRIFUGAL
WESTINGHOUSE
BOOSTER
FORCED DRAFT
DRY
  411.02
  130.0
    2.8
CARBON STEEL
               (  871000 ACFM)
                  266 F)
                 9.1 IN-H20)
 1
 0
WESTINGHOUSE
REHEATER
INDUCED DRAFT
DRY
  135.91
    2.7
CARBON STEEL
 2
 0
WESTINGHOUSE
UNIT
FORCED DRAFT
DRY
CARBON STEEL
SHUT-OFF
GUILLOTINE
NR
NR
NR
NR
NR
SHUT-OFF
                 288000 ACFM)
                 9.0 IN-H20)
                                             13-1260

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER
UTAH POWER & LIGHT: HUNTER 1 (CONT.)

     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 «* DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 «« DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 »» DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 *» DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
GUILLOTINE
NR
NR
NR
NR
NR
CONTROL
LOUVER
NR
NR
NR
NR
NR
 8
SHUT-OFF/CONTROL
GUILLOTINE/LOUVER
NR
CARBON STEEL/STAINLESS STEEL
HIGH STRENGTH LOW ALLOY IHSLAi; AUSTENITIC
NR
NR
 Z
CONTROL
BUTTERFLY
NR
NR
NR
NR
NR
 5
CONTROL
LOUVER/BUTTERFLY
NR
NR
NR
NR
NR
FAN DISCHARGE
RECTANGLE
15 X 18 X 13
CARBON STEEL
AISI 1110
NONE
N/A
INLET MANIFOLD
CIRCLE
18 D X 172,5  L
CARBON STEEL
AISI 1110
NONE
N/A
 INLET
 RECTANGLE
 8 X 16 X 7
 NR
 NR
                                             13-1361

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

UTAH POWER & LIGHT: HUNTER 1 (CONT.)
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 *« REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     NUMBER
     NUMBER OF SPARES
     FULL  LOAD DRY FEED CAPACITY - M.TONS/HR

 ** TANKS
     SERVICE
      THICKENER TRANSFER
      SLAKER TRANSFER
      ABSORBER RECYCLE
      PROCESS SUMP
      THICKENER SUMP
      FLOCCULATION  SYSTEM

  #*  PUMPS
      SERVICE
      ABSORBER RECIRCULATION
      THICKENER UNDERFLOW
      THICKENER OVERFLOW
      LIME SLUPRY
      THICKENER SUMP

 *» SOLIDS CONCENTRATING/DEWATERING
      DEVICE
      NUMBER
      NUMBER OF SPARES
      CONFIGURATION
NR
NR
OUTLET
RECTANGLE
8.5 X 13 X 2
NR
NR
NR
NR
OUTLET MANIFOLD
CIRCLE
16.75 D X 165 L
CARBON STEEL
AISI 1110
ORGANIC; INORGANIC
GLASS FLAKE-FILLED POLYESTER; HYDRAULICALLY-BOND
BYPASS REHEAT
CIRCLE
6 D X 60 L
CARBON STEEL
AISI 1110
NONE
N/A
REHEAT
RECTANGLE TO CIRCLE
9 X 7.5 TO 11.5 D X 83
CARBON STEEL
AISI 1110
NONE
N/A
SLAKER
NR
NR
 1
 0
    2.7        (   3 TPH)
NUMBER

   1
   1
   4
****
****
***«
NUMBER

  16
   2
   2
   2
   2
THICKENER
 1
0
CYLINDER
                                             13-1262

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
UTAH POWER t LIGHT: HUNTER 1 (CONT.)

     DIMENSIONS - FT
     CAPACITY
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OVERFLOW STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     CONFIGURATION
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     BELT GENERIC MATERIAL TYPE
     BELT SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

 *** SLUDGE

 »* TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 »» DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION  METHOD

 ** PROCESS CONTROL AND INSTRUMENTATION
     PROCESS STREAM
     CHEMICAL PARAMETERS
     CONTROL LEVELS
     MONITOR TYPE
     PROCESS CONTROL MANNER

 ** WATER BALANCE
     WATER  LOOP TYPE

 ** CHEMICALS AND  CONSUMPTION
     FUNCTION
     NAME
     UTILIZATION - X
     POINT  OF ADDITION

 ** FGD  SPARE CAPACITY INDICES
     ABSORBER - X

 *» FGD  SPARE COMPONENT INDICES
     ABSORBER
60 DIA X 12 HIGH
250000
CARBON STEEL
AISI 1110
ORGANIC
NR
ABSORBER BLEED, FILTER RECYCLE
543 GPM, 7X SOLIDS
100 GPM, 30X SOLIDS
400 GPM, 150 PPM SOLIDS
FILTER
ABSORBER
VACUUM FILTER
 Z
0
CYLINDER
6 DIA X 10 LONG
CARBON STEEL
AISI 1110
ORGANIC
NYLON
ORGANIC
NYLON
THICKENER UNDERFLOW
100 GPM, 30X SOLIDS
SOX SOLIDS
TRUCK TO LANDFILL
THICKENER
STABILIZATION
PUG MILL
N/A
FINAL
LANDFILL
OFF-SITE
TRUCK
ABSORBER RECYCLE TO SPRAYS
PH
5.8-6.2
UNILOG FLOW-THROUGH
AUTOMATIC
OPEN
 ABSORBENT
 LIME
    90.0
 SLAKER
                                             13-1263

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

UTAH POWER & LIGHT: HUNTER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 5/79  SYSTEM                  78.6                    32.8                  744   311    244

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         INITIAL FGD OPERATIONS BEGAN IN MAY 1979.

                         THE FIGURES REPORTED BY UTAH POWER AND LIGHT ARE NOT CONSISTENT WITH THE
                         FIGURES AS DEFINED BY PEDCO FOR THIS REPORT.  IN THIS SURVEY "FGD SYSTEM
                         HOURS" IS THE AVERAGE OF THE MODULAR HOURS ACCUMULATED BY EACH ABSORBER
                         DURING A GIVEN MONTH.  UPSL DEFINES "FGD SYSTEM HOURS" AS ACCUMULATED HOURS
                         WHEN ANY OR ALL OF THE ABSORBERS IS IN OPERATION DURING A GIVEN MONTH.  THE
                         OPERABILITY AND UTILIZATION FIGURES REPORTED ARE BASED UPON "FGD SYSTEM
                         HOURS" AS DEFINED BY UP»L AND THEREFORE MAY YIELD DEPENDABILITY FACTORS
                         THAT ARE NOT COMPARABLE WITH OTHER DEPENABILITY FACTORS INCLUDED IN THIS
                         SURVEY.

 6/79  SYSTEM                  98.0                    96.9                  720   713    698

 7/79  SYSTEM                 100.0                    99.1                  744   738    738

 8/79  SYSTEM                 100.0                   100.0                  744   744    744

 9/79  SYSTEM                 100.0                   100.0                  720   720    720

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR OPERATIONAL PROBLEMS WERE REPORTED BY THE UTILITY FOR THIS UNIT
                         DURING THE THIRD QUARTER OF 1979.

10/79  SYSTEM                 100.0                    95.6                  744   711    711

11/79  SYSTEM                 100.0                    91.1                  720   656    656

12/79  SYSTEM                 100.0                    98.2                  744   731    731

 1/80  SYSTEM                 100.0                    95.9                  744   713    713

 2/80  SYSTEM                 100.0                    86.8                  696   604    604

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THERE WERE NO MAJOR FGD PROBLEMS ENCOUNTERED
                         FROM OCTOBER 1979 THROUGH FEBRUARY 1980.

 3/80  SYSTEM                  57.8                    56.9                  744   732    423

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM WAS FORCED OUT OF SERVICE IN MARCH BECAUSE THE THICKENER
                         RAKE SHAFT FAILED AND THE TANK HAD TO BE DRAINED.  THIS OUTAGE KEPT THE
                         SYSTEM DOWN FOR APPROXIMATELY 309 HOURS.

 4/80  SYSTEM                 100.0                    60.1                  7ZO   433    433

 5/80  SYSTEM                 100.0                    64.0                  744   476    476

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE LOW FGD HOURS DURING APRIL AND MAY RESULTED FROM THE ANNUAL OUTAGE
                         FOR GENERAL FGD SYSTEM MAINTENANCE.

 6/80  SYSTEM                 100.0                    97.9                  720   705    705
                                            13-1264

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

UTAH POWER & LIGHT: HUNTER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                SOS  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO FGD SYSTEM PROBLEMS WERE REPORTED FOR JUNE.

 7/80  SYSTEM                 100.0                   100.0                  7**   74*    7**

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED DURING JULY.

 8/80  SYSTEM     100.0                                                      744   744

 9/80  SYSTEM     100.0                                                      720   713

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD PROBLEMS WERE ENCOUNTERED DURING
                         THE MONTHS OF AUGUST AND SEPTEMBER.

 10/80  SYSTEM                 100.0                    96.5                  7**   718    718

 11/80  SYSTEM                  80.0                    76.*                  720   687    550

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         OUTAGE TIME DURING NOVEMBER WAS THE RESULT OF A THICKENER RAKE FAILURE.
                         THE SYSTEM WAS  OFF LINE APPROXIMATELY SIX DAYS.

 12/80  SYSTEM                  96.6                    96.2                  7**   7*1    715

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         DURING DECEMBER 25 HOURS OF OUTAGE TIME WAS CAUSED BY A LIME SURER
                         PROBLEM.

 1/81  SYSTEM                 100.0                    92.7                  7**   690    690

 2/81  SYSTEM                 100.0                    9*.6                  672   636    636

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING JANUARY  AND FEBRUARY NO MAJOR PROBLEMS WERE ENCOUNTERED WITH THE
                         FGD SYSTEM.

 3/81  SYSTEM                 100.0                    30.5                  7**   227    227

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING MARCH THE BOILER AND THE SYSTEM WERE OUT  OF SERVICE  FOR APPROXIMATE-
                         LY 517 HOURS DUE TO A SCHEDULED OVERHAUL.

 */81  SYSTEM                 100.0                    65.7                  720   *73    *73

 5/81  SYSTEM                 100.0                    90.*                  7**   673    673

 6/81  SYSTEM                 100.0                    89.1                  720   6*2    6*2

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE  ENCOUNTERED
                         DURING THE SECOND QUARTER 1981.

 7/81  SYSTEM                                                                7*4
                                             13-1265

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

UTAH POWER t LIGHT: HUNTER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  '/. REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR


 8/81  SYSTEM                                                                744

 9/81  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE THIRD QUARTER 1981.

10/81  SYSTEM                                                                744

11/81  SYSTEM                                                                720

12/81  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FOURTH QUARTER 1981.

 1/82  SYSTEM                                                                744

 2/82  SYSTEM                                                                672

 3/82  SYSTEM                                                                744

       #* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FIRST QUARTER 1982.  THE UTILITY PLANS TO SHUTDOWN IN APRIL FOR
                         SCHEDULED OVERHAUL.

 4/82  SYSTEM                                                                720

 5/82  SYSTEM                                                                744

 6/82  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF-LINE FOR 4 WEEKS IN APRIL FOR A SCHEDULED BOILER/FGD
                         OVERHAUL.  THE UTILITY REPORTED NO OTHER MAJOR BOILER/FGD RELATED OUTAGES
                         FOR THE SECOND QUARTER 1982.

                         THE UTILITY REPORTED THAT THE UNIT IS EXPERIENCING REHEAT PROBLEMS.   THE
                         INDIRECT HOT AIR STEAM REHEAT SYSTEM IS NOT PRODUCING ADEQUATE REHEAT.
                         THE UTILITY IS PRESENTLY BAFFLED AS TO THE REASON FOR ITS INADEQUACY.

                         THE UTILITY ALSO REPORTED THAT THE UNIT IS EXPERIENCING FLYASH BUILDUP
                         AND SCALING IN THE OUTLET DUCTWORK TO THE STACK.

 7/82  SYSTEM                                                                744

 8/82  SYSTEM                                                                744

 9/82  SYSTEM                                                                720

10/82  SYSTEM                                                                744

11/82  SYSTEM                                                                720

12/82  SYSTEM                                                                744

 1/83  SYSTEM                                                                744
                                             13-1266

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

UTAH POWER & LIGHT: HUNTER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 2/83  SYSTEM                                                                672

 3/83  SYSTEM                                                                74*

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT IT NOW BELIEVES ITS REHEAT PROBLEM IS DUE TO
                         PLUGGED MIST ELIMINATORS AND NOT THE REHEATERS THEMSELVES.  THE MIST
                         ELIMINATORS BECOME PLUGGED AND SUBSEQUENTLY ALLOW INCREASED AMOUNTS OF
                         MOISTURE TO BE CARRIED-OVER FOR WHICH THE REHEAT SYSTEM WAS NOT ORIGINALLY
                         DESIGNED TO ACCOMMODATE.  THE UTILITY NOW MONITORS THE MIST ELIMINATORS
                         CLOSELY FOR PLUGGING AND CLEANS THEM WHENEVER IT HAS EXTENDED OUTAGE
                         PERIODS.

                         THE UNIT IS SCHEDULED FOR A MAJOR OUTAGE TO BEGIN SOMETIME IN APRIL FOR
                         TURBINE OVERHAUL.  DURING THIS PERIOD, THE MIST ELIMINATORS WILL BE
                         WASHED AND CLEANED.

 4/83  SYSTEM                                                                720

 5/83  SYSTEM                                                                744

 6/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE UNIT WAS DOWN FOR A PERIOD OF 7 WEEKS FOR A
                         SCHEDULED TURBINE OVERHAUL.  THE OUTAGE PERIOD STARTED AT THE END OF APRIL.
                         DURING THE OUTAGE THE MIST ELIMINATORS WERE CLEANED WITH FIRE 'HOSES.

 7/83  SYSTEM                                                                744

 8/83  SYSTEM                                                                744

 9/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO FGD-RELATED OUTAGES WERE ENCOUNTERED DURING
                         THE THIRD QUARTER OF 1983.  TOTAL UNIT OUTAGE TIME WAS APPROXIMATELY 64
                         HOURS AND TOOK PLACE ALL IN THE MONTH OF JULY.

 10/83  SYSTEM                                                                744

 11/83  SYSTEM                                                                720

 12/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS  UNAVAILABLE FOR THE  FOURTH QUARTER OF 1983.

 1/84  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED A  SIX WEEK SCHEDULED OUTAGE DURING  THE  FIRST QUARTER
                         OF 1984.  NO  FORCED OUTAGES WERE REPORTED.

 4/84  SYSTEM                                                                72°
                                             13-1267

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

UTAH POWER & LIGHT: HUNTER 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         A THICKENER RAKE FAILURE WAS REPORTED DURING THE SECOND QUARTER OF 1984.
                         HOWEVER NO FGD SYSTEM OPERATING TIME WAS LOST.  SLUDGE WAS TRUCKED TO A
                         WASTE PILE DURING THIS TIME.

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         TWO INCIDENCES OF LIMESTONE SLAKER FAILURE WERE REPORTED DURING THE THIRD
                         QUARTER OF 1984.  TOTAL OUTAGE TIME WAS 29 HOURS AND OVERALL FGD SYSTEM
                         AVAILABILITY WAS 80X.
                                            13-1268

-------
                                                  UTILITY FGD SURVEY! OCTOBER 1983 - SEPTEMBER 1984
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY W/FGD - MM
NET UNIT GENERATING CAPACITY MO/FGD - MM
EQUIVALENT SCRUBBED CAPACITY - MW

 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOM - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - V.
     AVERAGE MOISTURE CONTENT - '/.
     RANSE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** MECHANICAL COLLECTOR
     NUMBER
     TYPE

 ** ESP
     NUMBER
     NUMBER OF SPARES
     TYPE
     SUPPLIER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*** FGD SYSTEM
UTAH POMER * LIGHT
HUNTER
2
CASTLE DALE
UTAH
C
   43.         (  .100 LB/MMBTU)
  516.         ( 1.200 LB/MMBTU)
  301.         (  .700 LB/MMBTU)
  393
  420
  393
  400
  360
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
  822.05       (1742000 ACFM)
  130.0        ( 266 F)
  183.         ( 600 FT)
CONCRETE
    7.3        ( 24.0 FT)
               ( 11500 BTU/LB)
                10000-12600
COAL
BITUMINOUS
26749.

  '12.90
6.8-20.1
    7.60
3.6-16.9
      .52
0.41-0.90
********
******
 0
NONE
 2
 0
COLD SIDE
BUELL DIVISION, ENVIROTECH
  443.1        ( 939000 ACFM)
  127.8        (  262 F)
     .1        (  0. IN-H20)
    99.6
  0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                             13-1269

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

UTAH POWER & LIGHT: HUNTER Z (CONT.)
 »* GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     502 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - X
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X
     DESIGN COAL HEAT CONTENT - J/G
     DESIGN COAL ASH CONTENT - X
     DESIGN MOISTURE CONTENT - X
     OPER. t MAINT. REQUIREMENT - MANHR/DAY

 ** QUENCHER/PRESATURATOR
     NUMBER

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/6 RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF STAGES
     NUMSER OF PASSES PER STAGE
     FREEBOARD DISTANCE - M
     DISTANCE BETUEEN VANES - CM
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH FREQUENCY
     WASH RATE - L/S
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIME
 NONE
 GE ENVIRONMENTAL SERVICES
 STEARNS-ROGER
 FULL SCALE
 NEW
X   99.50
    80.00
     1.7
  1
  6/80
  6/80
  4/76
                ( 12500 BTU/LB)
     .55
29075.0
    9.00
    6.00
  160.0
  4
  0
 SPRAY TOWER
 OPEN COUNTERCURRENT SPRAY
 N/A
 GE ENVIRONMENTAL SERVICES
 27.5 DIAMETER X 35.5 HIGH
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 GLASS FLAKE-FILLED POLYESTER
 NR
 NONE
  1
  1178
     5
      7
     .6
    3.7
  205.51
  130.0
   80.0
(18700 GPM)
  42.9 GAL/1000 ACF)
  2.5 IN-H20)
  12.0 FT/S)
  435500 ACFM)
   266 F)
 PRIMARY COLLECTOR
  4
  0
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 HORIZONTAL
     1
     4
     3.66
     7.6
      .2
 ORGANIC
 POLYPROPYLENE
 FRESH & SUPERNATANT
 CONTINUOUS
     9.5        (150 GAL/MIN)
               (12,
               (  3.
    0 FT)
    00 IN)
               (  1.0 IN-H20)
                                            13-1270

-------
UTAH POWER I LIGHT: HUNTER Z (CONT.)
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984
 *» REHEATER
     NUMBER
     NUMBER OF SPARES
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     PERCENT GAS BYPASSED - AVG
     TEMPERATURE INCREASE - C
     INLET FLUE GAS TEMPERATURE - C
     OUTLET FLUE GAS TEMPERATURE - C
     NUMBER OF HEAT EXCHANGER BANKS
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE  - CU.M/S
     FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE  - CU.M/S
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE

 »* FANS
     NUMBER
     NUMBER OF SPARES
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     NUM3ER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC  TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
 1
 0
 1
INDIRECT HOT AIR
EXTERNAL HEAT EXCHANGER
STEAM TUBE BUNDLE
   15.0
   26.7        (   48 F)
   43.3        (  110 F)
   70.0        (  158 F)
   1
CARBON STEEL [HEADER]; STAINLESS STEEL [TUBES];
AISI 1110; NR; NR
 z
 0
WESTINGHOUSE
UNIT
FORCED DRAFT
DRY
CARBON STEEL
 2
 0
CENTRIFUGAL
WESTINGHOUSE
BOOSTER
FORCED DRAFT
DRY
  411.02
  130.0
    2.8
CARBON STEEL
(  871000 ACFM)
   266 F)
  9.1 IN-H20)
 1
 0
WESTINGHOUSE
REHEATER
INDUCED DRAFT
DRY
  135.91
    2.7
CARBON STEEL
 2
 0
WESTINGHOUSE
UNIT
FORCED DRAFT
DRY
CARBON STEEL
SHUT-OFF
GUILLOTINE
NR
NR
NR
NR
NR
 SHUT-OFF
( 288000 ACFM)
( 9.0 IN-H20)
                                             13-1271

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

UTAH POWER & LIGHT: HUNTER Z (CONT.)
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 *» DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC  MATERIAL  TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC  MATERIAL  TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC  MATERIAL  TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC  MATERIAL  TYPE

 #* DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC  MATERIAL  TYPE
GUILLOTINE
NR
NR
NR
NR
NR
CONTROL
LOUVER
NR
NR
NR
NR
NR
 8
SHUT-OFF/CONTROL
GUILLOTINE/LOUVER
NR
CARBON STEEL/STAINLESS STEEL
HIGH STRENGTH LOU ALLOY IHSLA]; AUSTENITIC
NR
NR
 2
CONTROL
BUTTERFLY
NR
NR
NR
NR
NR
 5
CONTROL
LOUVER/BUTTERFLY
NR
NR
NR
NR
NR
FAN DISCHARGE
RECTANGLE
15 X 18 X 13
CARBON STEEL
AISI 1110
NONE
N/A
INLET MANIFOLD
CIRCLE
18 D X 172.5 L
CARBON STEEL
AISI 1110
NONE
N/A
INLET
RECTANGLE
8 X 16 X 7
NR
NR
                                             13-1272

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984
UTAH POWER t LIGHT: HUNTER 2 (CONT.)

      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 «* DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 «* DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION  EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     NUMBER
     NUMBER OF SPARES
     FULL LOAD DRY FEED  CAPACITY - M.TONS/HR

 ** TANKS
     SERVICE
      THICKENER  TRANSFER
      SLAKER  TRANSFER
      ABSORBER RECYCLE
      PROCESS SUMP
      THICKENER  SUMP
      FLOCCULATION  SYSTEM

  ** PUMPS
      SERVICE
      ABSORBER  RECIRCULATION
      THICKENER UNDERFLOW
      THICKENER OVERFLOW
      LIME  SLURRY
      THICKENER SUMP

  »* SOLIDS CONCENTRATING/DEWATERING
      DEVICE
      NUMBER
      NUM3ER OF SPARES
      CONFIGURATION
NR
NR
OUTLET
RECTANGLE
8.5 X 13 X 2
NR
NR
NR
NR
OUTLET MANIFOLD
CIRCLE
16.75 D X 165 L
CARBON STEEL
AISI 1110
ORGANIC; INORGANIC
GLASS FLAKE-FILLED POLYESTER; HYDRAULICALLY-BOND
BYPASS REHEAT
CIRCLE
6 D X 60 L
CARBON STEEL
AISI 1110
NONE
N/A
REHEAT
RECTANGLE TO CIRCLE
9 X 7.5 TO 11.5 D X 83
CARBON STEEL
AISI 1110
NONE
N/A
SLAKER
NR
NR
     2.7
                (   3 TPH)
 NUMBER

    1
    1
    4
 **K*
 *««*
 ****
 NUMBER

   16
    2
    2
    2
    2
 THICKENER
  1
 0
 CYLINDER
                                             13-1273

-------
UTILITY FED SURVEY: OCTOBER 1983 - SEPTEMBER

UTAH POWER & LIGHT: HUNTER 2 (CONT.)

     DIMENSIONS - FT
     CAPACITY
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OVERFLOW STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     CONFIGURATION
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     BELT GENERIC MATERIAL TYPE
     BELT SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

 »** SLUDGE

 »* TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD

 ** PROCESS CONTROL AND INSTRUMENTATION
     PROCESS STREAM
     CHEMICAL PARAMETERS
     CONTROL LEVELS
     MONITOR TYPE
     PROCESS CONTROL MANNER

 ** WATER BALANCE
     WATER  LOOP TYPE

 #* CHEMICALS AND  CONSUMPTION
     FUNCTION
     NAME
     UTILIZATION - X
     POINT  OF ADDITION

 ** FGD SPARE CAPACITY  INDICES
     ABSORBER - X

 ** FGD SPARE COMPONENT INDICES
     ABSORBER
    60  OIA X 12  HIGH
    250000
    CARBON STEEL
    AISI  1110
    ORGANIC
    NR
    ABSORBER BLEED,  FILTER RECYCLE
    543 GPM, 7X  SOLIDS
    100 GPM, 30X SOLIDS
    400 GPM, 150 PPM  SOLIDS
    FILTER
    ABSORBER
    VACUUM FILTER
     2
    0
    CYLINDER
    6 DIA X 10 LONG
    CARBON STEEL
    AISI 1110
    ORGANIC
    NYLON
    ORGANIC
    NYLON
    THICKENER  UNDERFLOW
    100 GPM,  SOX SOLIDS
    SOX SOLIDS
    TRUCK TO  LANDFILL
    THICKENER
    STABILIZATION
    PUG MILL
    N/A
    FINAL
    LANDFILL
    OFF-SITE
    TRUCK
    ABSORBER RECYCLE TO SPRAYS
    PH
    5.8-6.2
    UNILOC FLOW-THROUGH
    AUTOMATIC
    OPEN
    ABSORBENT
    LIME
       90.0
    SLAKER
13-1274

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

UTAH POWER ft LIGHT: HUNTER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 0/80  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FIGURES REPORTED BY UTAH POWER AND LIGHT ARE NOT CONSISTENT WITH THE
                         FIGURES AS DEFINED BY PEDCO FOR THIS REPORT.  IN THIS SURVEY "FGD SYSTEM
                         HOURS" IS THE AVERAGE OF THE MODULAR HOURS ACCUMULATED BY EACH ABSORBER
                         DURING A GIVEN MONTH.  UPftL DEFINES "FGD SYSTEM HOURS" AS ACCUMULATED HOURS
                         WHEN ANY OR ALL OF THE ABSORBERS IS IN OPERATION DURING A GIVEN MONTH.  THE
                         OPERABILITY AND UTILIZATION FIGURES REPORTED ARE BASED UPON "FGO SYSTEM
                         HOURS" AS DEFINED BY UP4L AND THEREFORE MAY YIELD DEPENDABILITY FACTORS
                         THAT ARE NOT COMPARABLE WITH OTHER DEPENDABILITY FACTORS INCLUDED IN THIS
                         SURVEY.

 6/80  SYSTEM                 100.0                    99.5                  720   717    717

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         INITIAL OPERATIONS AT HUNTER Z BEGAN IN JUNE AND THE FGD SYSTUM WAS DECLAR-
                         ED COMMERICAL.  NO MAJOR STARTUP PROBLEMS WITH THE FGD SYSTEM WERE
                         ENCOUNTERED.

 7/80  SYSTEM                 100.0                    98.9                  744   736    736

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD-RELATED PROBLEMS WERE REPORTED DURING JULY.

 8/80  SYSTEM      99.7                                                      744   743

 9/80  SYSTEM     100.0                                                      720   720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD PROBLEMS WERE ENCOUNTERED DURING
                         AUGUST AND SEPTEMBER.

 10/80  SYSTEM                 100.0                    70.1                  744   521    521

 11/80  SYSTEM                 100.0                    98.3                  720   708    708

 12/80  SYSTEM                 100.0                    99.8                  744   742    742

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FOURTH QUARTER 1980.

 1/81  SYSTEM                 100.0                    88.8                  744   661    661

 2/81  SYSTEM                 100.0                    96.3                  672   647    647

 3/81  SYSTEM                 100.0                    99.4                  744   740    740

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FIRST QUARTER 1981.

 4/81  SYSTEM                 100.0                    99.6                  720   717    717

 5/81  SYSTEM                 100.0                    62.9                  744   468    468

 6/81  SYSTEM                 100.0                    90.8                  720   653    653
                                             13-1275

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

UTAH POWER & LIGHT: HUNTER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR


       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO FED-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE SECOND QUARTER 1981.

 7/81  SYSTEM                                                                744

 8/81  SYSTEM                                                                744

 9/81  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE THIRD QUARTER 1981.

10/81  SYSTEM                                                                744

11/81  SYSTEM                                                                720

12/81  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FOURTH QUARTER 1982.

 1/82  SYSTEM                                                                744

 2/82  SYSTEM                                                                672

 3/82  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FIRST QUARTER 1982.  THE NEXT SCHEDULED OUTAGE  FOR OVERHAUL
                         WILL BE  SOMETIME IN MAY OR  JUNE.

 4/82  SYSTEM                                                                720

 5/82  SYSTEM                                                                744

 6/82  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF-LINE  FROM  MAY  27 TO JUNE 10  FOR A SCHEDULED BOILER/FGD
                         OVERHAUL.  THE UTILITY REPORTED NO OTHER MAJOR BOILER/FGD  RELATED OUTAGES
                         FOR THE  SECOND QUARTER 1982.

                         THE UTILITY REPORTED THAT THE UNIT IS  EXPERIENCING REHEAT  PROBLEMS.   THE
                         INDIRECT HOT AIR STEAM REHEAT SYSTEM IS NOT PRODUCING ADEQUATE REHEAT.
                         THE UTILITY IS PRESENTLY BAFFLED AS TO THE REASON FOR ITS  INADEQUACY.

                         THE UTILITY ALSO REPORTED THAT  THE UNIT IS EXPERIENCING FLYASH BUILDUP
                         AND SCALING IN THE OUTLET DUCTWORK TO  THE STACK.

 7/82  SYSTEM                                                                744

 8/82  SYSTEM                                                                744

 9/82  SYSTEM                                                                720
                                             13-1276

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

UTAH POWER ft LIGHT: HUNTER 2 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


10/82  SYSTEM                                                                744

11/82  SYSTEM                                                                720

12/82  SYSTEM                                                                744

 1/83  SYSTEM                                                                7
-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER

UTAH POWER * LIGHT: HUNTER 2 (CONT.)
_	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE FOURTH QUARTER OF 1983.

 1/84  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED A SIX WEEK SCHEDULED OUTAGE DURING THE FIRST QUARTER
                         OF 1984.  NO FORCED OUTAGES WERE REPORTED.

 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

       »* PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD RELATED OUTAGES WERE REPORTED DURING THE SECOND QUARTER OF
                         1984.

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       *« PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD RELATED OUTAGES WERE REPORTED DURING THE THIRD QUARTER OF
                         1984.
                                            13-1278

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY. NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW
 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW
     BOILER FLUE GAS TEMPERATURE
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M
CU.M/S
C
UTAH POWER ft LIGHT
HUNTER
3
CASTLE DALE
UTAH
B
   13.
******
******
 1600
  400
                            (   .030 LB/MMBTU)
                            (****** LB/MMBTU)
                            (*»**** LB/MMBTU)
               495
               400
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
  701.72       (1487000 ACFM)
*******        (**** F)
  183.         (  600 FT)
NR
    7.3        (  24.0 FT)
 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

 *** PARTICLE CONTROL

 ** ESP
     NUMBER
     TYPE
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

 *** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY  - 7.
                            (  12500 BTU/LB)
                             12200-12700
COAL
BITUMINOUS
29075.

   10.00
9.0-12.0
    6.50
******
     .55
******
********
******
             COLD SIDE
                99.5
              0
             NONE
             N/A
             N/A
             N/A
             N/A
             N/A
             N/A
             N/A
             THROWAWAY PRODUCT
             WET SCRUBBING
             LIMESTONE
             GE ENVIRONMENTAL SERVICES
             STEARNS-ROGER
             FULL SCALE
             NEW
            7.   99.50
                90.00
                                             13-1279

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

UTAH POWER & LIGHT: HUNTER 3 (CONT. )

     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS

 ** QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 ** PUMPS
     SERVICE
NA
                                            1
                                            6/83
                                            4/83
                                           10/79
                                           NR
                                           NR
                                           SPRAY TOWER
                                           OPEN COUNTERCURRENT SPRAY
                                           N/A
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NONE
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           CENTRIFUGAL
                                           UNIT
                                           FORCED DRAFT
                                           DRY
                                           CARBON STEEL
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           NR
                                           WET BALL MILL
                                           NR
                                           NR
                                           NUMBER

                                           ****
                                       13-1280

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
UTAH POWER & LIGHT: HUNTER 3 (CONT.)
 ** SOLIDS CONCEKTRATING/DEWATERING
     DEVICE
     NUMBER

 ** SOLIDS CONCEKTRATING/DEWATERING
     DEVICE
     NUMBER

*** SLUDGE

 »* TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATURE
     TYPE
     SITE TRANSPORTATION METHOD
     SITE TREATMENT

 ** MATER BALANCE
     WATER LOOP TYPE
     SOURCE OF MAKEUP WATER
                       VACUUM FILTER
                        1
                       THICKENER
                        1
                       STABILIZATION
                       PUG MILL
                       N/A
                       FINAL
                       LANDFILL
                       TRUCK
                       NONE
                       CLOSED
                       COOLING TOWER SLOWDOWN
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION
                                       X REMOVAL   PER  BOILER   FGD    CAP.
                                       SOS  PART.  HOURS HOURS  HOURS FACTOR
 4/83  SYSTEM

 5/83  SYSTEM

 6/83  SYSTEM
                                                    720

                                                    744

                                                    720
       «* PROBLEMS/SOLUTIONS/COMMENTS
  7/83  SYSTEM
  8/83  SYSTEM
  9/83  SYSTEM
THE FGD SYSTEM COMMENCED OPERATION IN APRIL AND WAS REPORTED COMMERICAL
IN JUNE.

DUE TO IMPROPER DESIGN OF THE BYPASS DAMPERS AND THE MIST ELIMINATOR
MATERIALS OF CONSTRUCTION, THE MIST ELIMINATORS WERE MELTED IN MAY.   THE
BYPASS DAMPERS OPENED TOO SLOWLY AND THE MIST ELIMINATORS, CONSTRUCTED
OF NORYL GRADE EN-180, WERE DESIGNED FOR TEMPERATURES NOT TO EXCEED  180
DEGREES F.

                                                    744

                                                    744
                                                                             720
       ** PROBLEMS/SOLUTIONS/COMMENTS
10/83  SYSTEM
                         THE UTILITY REPORTED THAT NO FGD-RELATED OUTAGES WERE ENCOUNTERED DURING
                         THE THIRD QUARTER OF 1983.  HOWEVER, FORCED UNIT OUTAGES OCCURRED DURING
                         EACH MONTH.  THE TOTAL HOURS OF OUTAGE TIME FOR THE MONTHS  OF
                         JULY, AUGUST, AND SEPTEMBER WERE 179, 154, AND 160 RESPECTIVELY.

                         SCALE BUILDUP IN THE MIST ELIMINATORS AND ASSOCIATED DUCTWORK WAS REPORTED
                         BY THE UTILITY.  FIRST INSPECTIONS INDICATE THAT THE BUILDUP OF SCALE IS
                         DUE TO AN INADEQUATE SPRAY WASH SYSTEM.  THOSE SECTIONS CLOSE TO SPRAY NOZ-
                         ZLES ARE CLEAN.  HOWEVER, SOME PORTIONS ARE SEEING NO WASH WATER AND SUB-
                         SEQUENTLY ARE ACCUMULATING SCALE BUILDUP.

                                                                             744
                                            13-1281

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

UTAH POWER « LIGHT: HUNTER 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


11/83  SYSTEM                                                                720

12/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE FOURTH QUARTER OF 1983.

 1/84  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED A 30.5 HOUR OUTAGE DURING THE FIRST QUARTER OF 1984
                         DUE TO THE REPLACEMENT OF 1300 FEET OF CORRODING SLURRY TRANSFER LINE.

 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         TWO 4.5 HOUR OUTAGES OCCURRED DURING THE SECOND QUARTER OF 1984 DUE TO THE
                         REPLACEMENT OF 1300 FEET OF CORRODING SLURRY TRANSFER LINE.

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR FGD RELATED OUTAGES WERE REPORTED DURING THE THIRD QUARTER OF 1984
                                            13-1282

-------
                                                 UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER
                                           SECTION  13
              DESIGN  AND  PERFORMANCE DATA  FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY M/FGD - MM
NET UNIT GENERATING CAPACITY WO/FGO - MW
EQUIVALENT SCRUBBED CAPACITY - MW
UTAH POWER t LIGHT
HUNTINGTON
1
HUNTINGTON
UTAH
C
43. ( .100
516. ( 1.200
301. ( .700
810
432
400
407
366






LB/MMBTU)
LB/MMBTU)
LB/MMBTU )





 ** UNIT DATA -  BOILER AND  STACK
     BOILER  SUPPLIER
     BOILER  TYPE
     BOILER  SERVICE  LOAD
     DESIGN  EOILER  FLUE GAS FLOW - CU.M/S
     BOILER  FLUE GAS  TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT  CONTENT - BTU/LB
     AVERAGE ASH CONTENT -  7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - V.
     RANGE MOISTURE  CONTENT - 7.
     AVERAGE SULFUR  CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE  CONTENT - 7.

*»« PARTICLE CONTROL

 «» MECHANICAL COLLECTOR
     NUMBER
     TYPE

 ** ESP
     NUMBER
     NUMBER  OF SPARES
     TYPE
     SUPPLIER
     INLET FLUE  GAS CAPACITY - CU.M/S
     INLET FLUE  GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     PARTICLE REMOVAL EFFICENCY - 7.

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE  TYPE

*** FGD SYSTEM
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
  822.05       (1742000 ACFM)
  130.0        (  266 F)
  183.         (  600 FT)
CONCRETE
    7.3        (  24.0 FT)
               (  11650 BTU/LB)
                11100-12100
COAL
BITUMINOUS
27098.

   12.02
7.27-28.15
    7.73
2.13-14.99
     .43
0.29-0.83
********
*«***«
 0
NONE
 1
 0
COLO SIDE
BUELL DIVISION, ENVIROTECH
  822.0        (1742000 ACFM)
  127.8        (  262 F)
     .4        (  1. IN-H20)
   99.5
 0
NONE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
                                            13-1283

-------
UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

UTAH POWER t LIGHT: HUNTINGTON 1 (CONT.)
 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - 7.
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 #* DESIGN AND OPERATING PARAMETERS
     DESIGN COAL SULFER CONTENT - X
     DESIGN COAL HEAT CONTENT - J/G
     DESIGN COAL ASH CONTENT - X
     DESIGN MOISTURE CONTENT - X
     OPER. « MAINT. REQUIREMENT - MANHR/DAY

 ** QUENCHER/PRESATURATOR
     NUMBER

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATER-IAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC
     INLET GAS FLOW - CU. M/S
     INLET GAS TEMPERATURE - C
     S02 REMOVAL EFFICIENCY - X

 «* MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     NUMBER PER SYSTEM
     NUMBER OF SPARES PER SYSTEM
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES PER STAGE
     FREEBOARD DISTANCE - M
     DISTANCE BETWEEN VANES - CM
     PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH FREQUENCY
 THROWAWAY PRODUCT
 WET SCRUBBING
 LIME
 NONE
 GE ENVIRONMENTAL SERVICES
 STEARNS-ROGER
 FULL SCALE
 NEW
X   99.50
    80.00
     1.6
  1
  5/78
  5/78
  1/75
     .55
29075.0
    9.00
    6.00
  136.0
                (  12500 BTU/LB)
 SPRAY TOWER
 OPEN COUNTERCURRENT SPRAY
 N/A
 GE ENVIRONMENTAL SERVICES
 27.5 DIAMETER X 96 HIGH
 CARBON STEEL
 AISI 1110
 N/A
 ORGANIC
 GLASS FLAKE-FILLED POLYESTER
 FLAKELINE 103
 NONE
  1
  1178.
     5.7
      .6
     3.0
   205.51
   130.0
    80.0
               (18700 GPM)
               (  42.9 GAL/1000 ACF)
               (  2.5 IN-H20)
               (  10.0 FT/S)
               (  435500 ACFM)
               (   266 F)
 PRIMARY COLLECTOR
  4
  0
  1
 IMPINGEMENT
 BAFFLE
 CLOSED VANE
 HORIZONTAL
     1
     4
     3.66       (12.0 FT)
     7.6        ( 3.00 IN)
      .2        ( 1.0 IN-H20)
     3.0        (10.0 FT/S)
 ORGANIC
 POLYPROPYLENE
 FRESH t SUPERNATANT
 CONTINUOUS/INTERMITTENT
                                             13-1284

-------
                                                  UTILITY FGD SURVEY:  OCTOBER 1983 -  SEPTEMBER
UTAH POWER ft LIGHT: HUNTINGTON 1 (CONT.)

     WASH RATE - L/S

 ** REHEATER
     NUMBER
     NUMBER OF SPARES
     NUMBER PER MODULE
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     TEMPERATURE INCREASE - C
     INLET FLUE GAS TEMPERATURE - C
     OUTLET FLUE GAS TEMPERATURE - C
     NUMBER OF HEAT EXCHANGER BANKS
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     FLUE GAS TEMPERATURE - C
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE

 «* FANS
     NUMBER
     NUMBER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 »* FANS
     NUMBER
     NUH3ER OF SPARES
     DESIGN
     SUPPLIER
     FUNCTION
     APPLICATION
     SERVICE
     FLUE GAS FLOW RATE - CU.M/S
     PRESSURE DROP - KPA
     CONSTRUCTION MATERIAL GENERIC TYPE

 »* DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     SEAL AIR FLOW - CU. M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 »* DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     SEAL AIR FLOW - CU. M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
   15.1
               (   240  GAL/MIN)
 1
 0
 1
INDIRECT HOT AIR
EXTERNAL HEAT EXCHANGER
STEAM TUBE BUNDLE
   11.1        (   20 F)
   46.1        (  115 F)
   57.2        (  135 F)
   1
CARBON STEEL [HEADER];  STAINLESS STEEL  ITUBESJi
AISI 1110; AUSTENITIC;  N/A
 Z
 0
CENTRIFUGAL
WESTINGHOUSE
BOOSTER
FORCED DRAFT
DRY
  519.09
  144.4
    2.8
CARBON STEEL
               (1100000  ACFM)
               (   292  F)
               (  9.1 IN-H20)
 2
 0
CENTRIFUGAL
NR
UNIT
FORCED DRAFT
DRY
CARBON STEEL
 1
 0
CENTRIFUGAL
WESTINSHOUSE
REHEATER
N/A
DRY
  135.91
    2.7
CARBON STEEL
                 288000 ACFM)
                 9.0 IN-H20)
               (    2700 ACFM)
 4
ISOLATION
GUILLOTINE
NR
    1.27
CARBON STEEL
HIGH STRENGTH LOW ALLOY IHSLAl; AISI 1110
NONE
N/A
 4
ISOLATION ft CONTROL
GUILLOTINE ft LOUVER
NR; NR
    1.70       (   3600 ACFM)
CARBON STEEL/STAINLESS STEEL
HIGH STRENGTH LOW ALLOY [HSLAl; AUSTENITIC
NONE
                                            13-1285

-------
UTILITY F6D SURVEY? OCTOBER 1983 - SEPTEMBER 1984

UTAH POWER & LIGHT: HUNTINGTON 1 (CONT.)

     LINER SPECIFIC MATERIAL TYPE               N/A
 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMEER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 ** DAMPERS
     NUMBER
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LIHER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE

 *# DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC MATERIAL TYPE
CONTROL
BUTTERFLY
N/A
STAINLESS STEEL
AUSTENITIC
NONE
N/A
 5
CONTROL
BUTTERFLY
N/A
STAINLESS STEEL
AUSTENITIC
NONE
N/A
CONTROL
BUTTERFLY
N/A
CARBON STEEL
AISI 1110
NONE
N/A
ISOLATION
GUILLOTINE
NR
NR
NR
NONE
N/A
ISOLATION
GUILLOTINE
NR
NR
NR
NONE
N/A
FAN DISCHARGE
RECTANGLE
15 X 18 X 13
CARSON STEEL
AISI 1110
NONE
N/A
INLET MANIFOLD
CIRCULAR
18 0 X 173.5
CARBON STEEL
AISI 1110
NONE
N/A
                                            13-1386

-------
UTAH POWER & LIGHT: HUNTINGTON 1 (CONT.)
                                                  UTILITY FGO SURVEY:  OCTOBER  1983 -  SEPTEMBER  1984
 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 »* DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 »* DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 *» DUCTWORK
     LOCATION
     CONFIGURATION
     DIMENSIONS
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 *» REAGENT PREPARATION  EQUIPMENT
     FUNCTION
     DEVICE
     MANUFACTURER
     NUMBER
     NUMBER OF SPARES
     FULL  LOAD DRY FEED  CAPACITY -  M.TONS/HR

 ** TANKS
     SERVICE
      ABSORBER  RECYCLE
      LIME  SLURRY
      TRANSFER  WATER
      FLOCCULATION  SYSTEM
      THICKENER SUMP
      PROCESS SUMP

  «*  PUMPS
      SERVICE
      ABSCRBER  RECIRCULATION
      THICKENER UNDERFLOW
      SLURRY  TRANSFER
      THICKENER OVERFLOW
ABSORBER INLET
RECTANGLE
8 X 16 X 7
CARBON STEEL
AISI 1110
INORGANIC
HYDRAULICALLY-BONDED MORTAR
ABSORBER OUTLET
RECTANGLE
8.5 X 13 X 12
CARBON STEEL
AISI 1110
INORGANIC
HYDRAULICALLY-BONDED MORTAR
OUTLET MANIFOLD
CIRCULAR
16.75 0 X 165
CARBON STEEL
AISI 1110
INORGANIC
HYDRAULICALLY-BONDED MORTAR
BYPASS REHEAT
CIRCULAR
6 D X 60
CARBON STEEL
AISI 1110
NONE
N/A
REHEAT
RECTANGLE TO CIRCULAR
9 X 7.5 TO 11.5 D X 83
CARBON STEEL
AISI 1110
NONE
N/A
SLAKER
SLAKER
BIF
 1
 0
    2.7        (   3 TPH)
NUMBER
    1
    1
****
****
****
 NUMBER

   16
    2
    2
    2
                                             13-1287

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

UTAH POWER « LIGHT: HUNTINGTON 1 (CONT.)
     FILTRATE
     ME WASH
     THICKENER SUMP
     PROCESS SUMP

 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     CONFIGURATION
     DIMENSIONS - FT
     CAPACITY
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     BELT GENERIC MATERIAL TYPE
     BELT SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

 «* SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMEER
     NUMBER OF SPARES
     CONFIGURATION
     DIMENSIONS - FT
     CAPACITY
     SHELL GENERIC MATERIAL TYPE
     SHELL SPECIFIC MATERIAL TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
     FEED STREAM SOURCE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS
     OVERFLOW STREAM CHARACTERISTICS
     OUTLET STREAM DISPOSITION
     OVERFLOW STREAM DISPOSITION

 *** SLUDGE

 ** TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

 ** DISPOSAL
     NATUPE
     TYPE
     LOCATION
     SITE TRANSPORTATION METHOD
     SITE TREATMENT

 ** PROCESS CONTROL AND INSTRUMENTATION
     PROCESS STREAM
     CHEMICAL PARAMETERS
     CONTROL LEVELS
     MONITOR TYPE
     PROCESS CONTROL MANNER

 ** WATER BALANCE
     WATER LOOP TYPE
     MAKEUP WATER ADDITION - LITERS/S
****
****
   2
****
VACUUM FILTER
 Z
0
CYLINDER
6 DIA X 10 LONG
19000 LB/HR
STAINLESS STEEL
AUSTENITIC
NONE
N/A
ORGANIC
POLYPROPYLENE
THICKENER UNDERFLOW
100 GPM, 30X SOLIDS
SOX SOLIDS
LANDFILL
TO THICKENER
THICKENER
 1
0
CYLINDRICAL
60 DIA X 12 HIGH
250000
CARBON STEEL
ASTM A-36
ORGANIC
GLASS FLAKE-FILLED POLYESTER
ABSORBER BLEED
5*3 GPM, 5X SOLIDS
100 GPM, 30X SOLIDS
400 GPM, 150 PPM
TO VACUUM FILTER
RETURNED TO FGD SYSTEM
STABILIZATION
PUG MILL
N/A
FINAL
LANDFILL
ON-SITE
TRUCK
NONE
ABSORBER RECYCLE TO SPRAYS
PH, CONTINUOUS
5.8-6.2
UNILOC FLOW-THROUGH
AUTOMATIC
CLOSED
   18.9
                                                                (   300 GPM)
                                             13-1288

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER

UTAH POWER & LIGHT: HUNTINGTON 1 (CONT.)


 ** CHEMICALS AND CONSUMPTION
     FUNCTION                                   ABSORBENT
     NAME                                       LIME
     PRINCIPAL CONSTITUENT                      92X CAO, 6X MGO
     UTILIZATION - X                               90.0
     POINT OF ADDITION                          SLAKER

 ** FGD SPARE CAPACITY INDICES
     ABSORBER - X                                    .0

 ** FGD SPARE COMPONENT INDICES
     ABSORBER                                        .0
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 0/78  SYSTEM

       *« PROBLEMS/SOLUTIONS/COMMENTS

                         THE  FIGURES REPORTED BY UTAH POWER AND LIGHT ARE NOT CONSISTENT WITH THE
                         FIGURES AS DEFINED BY PEDCO FOR THIS REPORT.  IN THIS SURVEY "FGD SYSTEM
                         HOU3S" IS THE AVERAGE OF THE MODULAR HOURS ACCUMULATED BY EACH ABSORBER
                         DURING A GIVEN MONTH.  UPSL DEFINES "FGD SYSTEM HOURS" AS ACCUMULATED HOURS
                         WHEN ANY OR ALL OF THE ABSORBERS IS IN OPERATION DURING A GIVEN MONTH.  THE
                         OPERABILITY AND UTILIZATION FIGURES REPORTED ARE BASED UPON "FGD SYSTEM
                         HOURS" AS DEFINED BY UP&L AND THEREFORE MAY YIELD DEPENDABILITY FACTORS
                         THAT ARE NOT COMPARABLE WITH OTHER DEPENABILITY FACTORS INCLUDED IN THIS
                         SURVEY.

 5/78  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INITIAL OPERATIONS BEGAN ON MAY 10, 1978.  COMMERCIAL FGD SYSTEM OPERATIONS
                         ARE  EXPECTED TO BEGIN IN JUNE.

 6/78  SYSTEM                  65.3                    65.3                  720   720    470

 7/78  SYSTEM                  97.7                    95.9                  744   731    714

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED THAT BECAUSE 10-20X OF THE FLUE GAS BYPASSED THE FGD
                         SYSTEM AS DAMPERS ARE VARRIED BY THE OPERATOR, IT IS DIFFICULT TO DETERMINE
                         OVERALL S02 REMOVAL EFFICIENCY.

 8/78  SYSTEM                 100.0                    73.1                  744   544    544

 9/78  SYSTEM                 100.0                    68.9                  720   496    496

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         AN EXPLOSION CAUSED A THREE WEEK BOILER OUTAGE DURING THE AUGUST-SEPTEMBER
                         PERIOD.

                         THE  UTILITY REPORTED THAT THERE WERE NO FORCED FGD OUTAGES DURING AUGUST
                         AND  SEPTEMBER.

10/78  SYSTEM                 100.0                   100.0                  744   744    744

11/78  SYSTEM                  62.4                    62.4                  720   720    449
                                             13-1289

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

UTAH POWER & LIGHT: HUNTINGTON 1 (CONT.)
	PERFORMANCE DATA	•	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE THICKENER HAD SOLIDS BUILDUP THE LAST OF NOVEMBER AND THE FIRST PART
                         OF DECEMBER RENDERING THE RAKE INOPERATIVE.  THE FGD SYSTEM WAS TAKEN OUT
                         OF SERVICE TO ALLOW MANUAL REMOVAL OF THE SOLIDS.

                         TO PREVENT FUTURE SOLIDS BUILDUP IN THE THICKENER THE UTILITY IS CONSIDER-
                         ING LOWERING THE PH AND POSSIBLY ADDING A FORCED OXIDATION SYSTEM.  FOR NOW
                         THE UTILITY IS ATTEMPTING TO BE MORE CONSCIENTIOUS IN MAINTAINING PROPER
                         SOLIDS CONTENT IN THE THICKENERS.

12/78  SYSTEM                  34.0                    32.7                  744   715    243

  1/79  SYSTEM                  76.2                    65.7                  744   642    489

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         FREEZE-UP PROBLEMS CAUSED OUTAGES TOTALLING A FEW WEEKS DURATION DURING
                         DECEMBER AND JANUARY.

  2/79  SYSTEM                  90.1                    58.2                  672   434    391

  3/79  SYSTEM                 100.0                    86.6                  744   644    644

  4/79  SYSTEM                 100.0                    76.8                  720   553    553

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE PROBLEMS ENCOUNTERED DURING FEBRUARY-APRIL
                         INCLUDED LINING FAILURES (BOTH DESIGN-RELATED AND APPLICATION-RELATED),
                         PUMP PROBLEMS AND DAMPER PROBLEMS.

                         PROBLEMS HAVE BEEN EXPERIENCED WITH DAMPER MECHANISMS CLOGGING.  THE CLOG-
                         GING CAN RESULT IN DAMPER LEAKING AS MUCH AS SOX.

                         THE UTILITY HAS BEEN OPERATING THE FGD SYSTEM AT A PH OF 5 RATHER THAN THE
                         DESIGN 6.5 TO YIELD A BETTER QUALITY SLUDGE PRODUCT.

  5/79  SYSTEM                 100.0                    92.6                  744   689    689

  6/79  SYSTEM                  62.5                    54.9                  720   632    395

  7/79  SYSTEM                  79.7                    79.5                  744   742    591

  8/79  SYSTEM                  30.1                    27.0                  744   669    201

  9/79  SYSTEM                  54.9                    54.2                  720   712    391

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE PROBLEMS ENCOUNTERED DURING THE THIRD QUARTER 1979 INCLUDED FAILURE
                         OF CONTROL VALVES AND SOME AGITATOR PROBLEMS.

10/79  SYSTEM                                                                744   497

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         ON OCTOBER 15 FGD OPERATIONS WITH LIMESTONE WERE INITIATED FOR TESTING
                         PURPOSES.  IF THE FGD SYSTEM OPERATIONS ARE ADEQUATE WITH LIMESTONE THE
                         UTILITY WILL STUDY THE ECONOMIC TRADEOFFS OF LIME VS LIMESTONE SUCH AS
                         PUMP WEAR ETC.  IF THE RESULTS FAVOR LIMESTONE THE HUNTINGTON 1 FGD SYSTEM
                         PROCESS MAY BE SHIFTED FROM LIME TO LIMESTONE.

11/79  SYSTEM                                                                720    28
                                            13-1290

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1963 - SEPTEMBER 1984

UTAH POWER ft LIGHT: HUMTINGTON 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


12/79  SYSTEM                                                                744   642

 1/80  SYSTEM                                                                744   66a

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DUE TO A  LACK OF RECORDS, DATA CONCERNING THE FGD SYSTEM OPERATIONS WAS
                         UNAVAILABLE FOR THE MONTHS OF OCTOBER 1979 THROUGH JANUARY 1980.  IN
                         NOVEMBER  THE BOILER WAS DOWN MOST OF THE MONTH FOR A SCHEDULED UNIT
                         OVERHAUL.

 2/80  SYSTEM                 100.0                    86.9                  696   605    605

 3/80  SYSTEM                 100.0                    89.2                  744   664    664

 4/80  SYSTEM                  98.1                    92.1                  720   676    663

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM OPERATED ALONG WITH THE BOILER DURING FEBRUARY AND MARCH
                         WITH NO MAJOR PROBLEMS.

 5/80  SYSTEM                 100.0                    99.7                  744   742    742

 6/80  SYSTEM                 100.0                    99.2                  720   714    714

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM OPERATED ALONG WITH THE BOILER DURING THE APRIL THROUGH
                         JUNE PERIOD EXCEPT FOR A FEW HOURS IN APRIL.  THE UTILITY REPORTED THAT
                         NO MAJOR  PROBLEMS OCCURRED DURING THIS TIME.

 7/80  SYSTEM                 100.0                    87.2                  744   649    649"

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR  FGD-RELATED  PROBLEMS WERE REPORTED DURING JULY.

 8/80  SYSTEM     100.0                                                      744   695

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR  OPERATIONAL  PROBLEMS WERE REPORTED IN AUGUST.

 9/80  SYSTEM         .0                                   .0                  720      0      0

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE FGD SYSTEM AND BOILER WERE DOWN THROUGHOUT SEPTEMBER  FOR A  SCHEDULED
                         MAINTENANCE OVERHAUL.

10/80  SYSTEM                 100.0                    97.5                  744   726     726

11/80  SYSTEM                 100.0                   100.0                  720   720     720

12/80  SYSTEM                 100.0                    99.5                  744   741     741

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED  THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FOURTH QUARTER 1980.

 1/81  SYSTEM                 100.0                    96.4                  744   717     717
                                             13-1291

-------
UTILITY FGO SURVEYS OCTOBER 1983 - SEPTEMBER 1984

UTAH POWER £ LIGHT: HUNTINGTON 1 (CONT.)
	—.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  7. REMOVAL   PER  BOILER   FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR


 2/81  SYSTEM                 100.0                   100.0                  672   672    672

 3/81  SYSTEM                 100.0                    93.5                  744   696    696

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         DURING THE FIRST QUARTER 1981, THE UTILITY REPORTED THAT NO MAJOR FGD-
                         RELATED PROBLEMS MERE EXPERIENCED.

 4/81  SYSTEM                 100.0                    34.8                  720   251    251

 5/81  SYSTEM                 100.0                     4.2                  744    31     31

 6/81  SYSTEM                 100.0                    77.5                  720   558    558

       ** FROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-REUTED PROBLEMS WERE ENCOUNTERED
                         DURING THE SECOND QUARTER 1981.  LOW BOILERS HOURS DURING THE MONTH OF
                         MAY WERE DUE TO COAL STRIKE AND SCHEDULED UNIT OUTAGE.

 7/81  SYSTEM                                                                744

 8/81  SYSTEM                                                                744

 9/81  SYSTEM                                                                720

       #* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE THIRD QUARTER 1981.

 10/81  SYSTEM                                                                744

 11/81  SYSTEM                                                                720

 12/81  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-RELATED PROBLEMS WERE FNCOUNTERED
                         DURING THE FOURTH QUARTER 1981.

 1/82  SYSTEM                                                                744

 2/82  SYSTEM                                                                672

 3/82  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO-FGD RELATED PROBLEMS WERE ENCOUNTERED DURING
                         THE FIRST QUARTER OF 1982.  THE UNIT WENT OFF-LINE ON APRIL 26 FOR A
                         SCHEDULED OVERHAUL.

 4/82  SYSTEM                                                                7ZO

 5/82  SYSTEM                                                                744

 6/82  SYSTEM                                                                720
                                             13-1292

-------
                                                  UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984

UTAH POWER t LIGHT: HUNTINGTON 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT THE UNIT WAS OFF-LINE FOR A SCHEDULED BOILER/FGD
                         OUTAGE PERIOD FROM APRIL 26 TO MAY 14.  THE UNIT WAS ALSO TRIPPED
                         VOLUNTARILY FOR ONE DAY IN JUNE TO REPLACE A BOILER VALVE.  NO OTHER
                         BOILER/FGD RELATED PROBLEMS WERE REPORTED FOR THE SECOND QUARTER 1982.

 7/82  SYSTEM                                                                744

 8/82  SYSTEM                                                                744

 9/82  SYSTEM                                                                720

10/82  SYSTEM                                                                720

11/82  SYSTEM                                                                720

12/82  SYSTEM                                                                744

 1/83  SYSTEM                                                                744

 2/83  SYSTEM                                                                672

 3/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE PERIOD OF JULY 1982 THROUGH MARCH 1983.

 4/83  SYSTEM                                                                720

 5/83  SYSTEM                                                                744

 6/83  SYSTEM                                                                7ZO

       «* PR03LEMS/SOLUTIONS/COMMENTS

                         THE UNIT WAS OFF-LINE FOR 5 WEEKS IN MAY FOR A SCHEDULED SPRING OUTAGE.
                         DURING THIS PERIOD, THE ABSORBER OUTLET GUILLOTINE DAMPERS WERE CONVERTED
                         FROM BOTTOM-ENTRY TO TOP-ENTRY.  THE UTILITY REPORTED THAT WATER CARRYOVER
                         FROM THE MIST ELIMINATORS WAS DRAINING INTO THE BOTTOM-ENTRY DAMPERS.  IN
                         WINTER MONTHS, THE WATER WOULD FREEZE AND THE UTILITY WAS OFTEN UNABLE
                         TO CLOSE THE DAMPERS TO ISOLATE THE ABSORBER TOWERS FOR REPAIRS.

                         STARTING IN OCTOBER OF LAST YEAR AND ENDING IN MAY, THE UTILITY INSTALLED
                         NEW AGITATORS IN THE BOTTOM OF THE ABSORBER TOWERS TO IMPROVE SLURRY MIX-
                         ING.  THE INSTALLATION WAS COMPLETED DURING OUTAGE PERIODS ON A MODULE-BY-
                         MODULE BASIS.

                         THE UTILITY REPORTED THAT ONCE OR TWICE A YEAR THE MIST ELIMINATORS ARE RE-
                         MOVED FOR MANUAL CLEANING DUE TO SCALE BUILDUP.  THE CLEANING IS NORMALLY
                         DONE EACH YEAR DURING THE SCHEDULED SPRING OUTAGE.  THE PROCESS IS VERY
                         COSTLY AND IS NECESSARY NOT ONLY AT THE HUNTINGTON STATION BUT ALSO AT
                         THE HUNTER UNITS.  THE UTILITY IS PRESENTLY INSTALLING AT HUNTINGTON A MIST
                         ELIMINATOR WASH ADDITIVE FEED SYSTEM TO SOLVE THE SCALING PROBLEM.  IT IS
                         HOPED THAT THE ADDITIVE WILL BOTH INHIBIT AND DISSOLVE SCALE BUILDUP ON THE
                         MIST ELIMINATORS.

 7/83  SYSTEM                                                                744

 8/83  SYSTEM                                                                744

 9/83  SYSTEM                                                                720
                                             13-1293

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

UTAH POWER * LIGHT: HUNTINGTON 1 (CONT.)
	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR OUTAGES OCCURRED DURING THE THIRD
                         QUARTER 1983.

                         THE UTILITY IS PRESENTLY INSTALLING A NEW PH MONITORING SYSTEM.  THE PH
                         PROBES WILL BE POSITIONED IN THE RECYCLE PUMP LINES LOCATED IN-HOUSE OUT OF
                         THE WEATHER.  THE UTILITY BELIEVES THIS WILL ENCOURAGE MAINTENANCE WORKERS
                         TO CLEAN THEM VERSUS THE PRESENT PROBES WHICH ARE POSITIONED AT THE BOTTOM
                         OF THE ABSORBER VESSELS LOCATED OUTSIDE IN THE WEATHER.

                         THE UTILITY ALSO PLANS TO INSTALL ULTRASONIC MONITORS ON ALL FOUR ABSORBER
                         VESSELS TO MONITOR LIQUID LEVEL.  IN ADDITION TO THE PH MONITORING SYSTEM,
                         THE UTILITY BELIEVES THIS WILL ENABLE THEM TO BETTER CONTROL SYSTEM CHEM-
                         ISTRY.

10/83  SYSTEM                                                                744

11/83  SYSTEM                                                                720

12/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         NO MAJOR F6D-RELATED OUTAGES WERE REPORTED IN THE THIRD QUARTER.  THE FGD
                         SYSTEM WAS OFF-LINE OCTOBER 31 THROUGH NOVEMBER 2 TO WASH OUT THE THICK-
                         ENER.  THE UTILITY BELIEVES THE THICKENER PLUGGED DUE TO EXCESSIVE ADDI-
                         TION OF FLOCCULANT.  THE UTILITY IS PRESENTLY TESTING A NEW POLYMER FLOC-
                         CULANT.

                         BEGINNING IN OCTOBER, THE UTILITY BEGAN TESTING A SCALE INHIBITOR IN MODULE
                         4.  IN JANUARY, THE MODULE IS TO BE TAKEN OFF-LINE AND COMPARED TO OTHER
                         MODULES WHICH ARE NOT USING THE SCALE INHIBITOR.  THE CHEMICAL BEING TESTED
                         IS AN ORGANIC PHOSPHATE.

                         THE UNIT WAS DOWN FOR A COUPLE OF DAYS DURING THE FOURTH QUARTER FOR CON-
                         DENSER TUBE AND BOILER RECIRCULATION PUMP REPAIRS.

  1/84  SYSTEM                                                                744

  2/84  SYSTEM                                                                696

  3/84  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD RELATED PROBLEMS WERE ENCOUNTERED
                         DURING THE FIRST QUARTER OF 1984.

  4/84  SYSTEM                                                                720

  5/84  SYSTEM                                                                744

  6/84  SYSTEM                                                                720

  7/84  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT A SCHEDULED OVERHAUL TOOK PLACE FROM APRIL
                         THROUGH JULY 1984.

  8/84  SYSTEM                                                                744
                                            13-1294

-------
                                                  UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 198*

UTAH POWER & LIGHT: HUNTINGTON 1 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 9/8*  SYSTEM                                                                720

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD RELATED PROBLEMS MERE ENCOUNTERED
                         DURING  AUGUST AND SEPTEMBER 1984.
                                             13-1295

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER 1984
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY W/FGD - MW
NET UNIT GENERATING CAPACITY WO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW
UTAH POWER
NAUGHTON
3
KEMMERER
WYOMING
A
******
86.
******
*****
330
310
315
330
* LIGHT





(****«* LB/MMBTU)
( .200 LB/MMBTU)
(*»**** LB/MMBTU)





 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOW - CU.M/S
     BOILER FLUE GAS TEMPERATURE - C
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/S
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - 7.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7.
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

 «** PARTICLE CONTROL

 »* ESP
     NUMBER
     TYPE

 ** PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

 «** FGD SYSTEM

 ** GENERAL DATA
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     502 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN PARTICLE REMOVAL EFFICIENCY
     UNIT DESIGN S02 REMOVAL EFFICIENCY - 7.
     ENERGY CONSUMPTION - 7.
 COMBUSTION ENGINEERING
 PULVERIZED COAL
 BASE
   707.85       (1500000 ACFM)
   1*8.9        (  300 F)
   145.          (  475 FT)
 NR
 *******        (***** FT)
COAL
SUBBITUMINOUS
22097.

    6.00
******
********
                (   9500 BTU/LB)
                 ******
      .55
 ******
 ********
 ******
 HOT SIDE
  0
 NONE
 N/A
 N/A
 N/A
 N/A
 N/A
 N/A
 N/A
 THROWAWAY PRODUCT
 WET SCRUBBING
 SODIUM CARBONATE
 AIR CORRECTION DIVISION, UOP
 BECHTEL
 FULL SCALE
 RETROFIT
7.   98.00
    70.00
     1.5
                                             13-1296

-------
                                                  UTILITY FGO SURVEY:  OCTOBER 1983 - SEPTEMBER  198*
UTAH POWER & LIGHT: NAUGHTON 3 (CONT.)

     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS

 «« QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 «* ABSORBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE

 ** MIST  ELIMINATOR
     PRE-MIST ELIMINATOR/MIST  ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 »* FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 »» DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC  TYPE
      LINER  GENERIC  MATERIAL  TYPE
      LINER  SPECIFIC MATERIAL TYPE

 »* DUCTWORK
       SHELL GENERIC MATERIAL TYPE
       SHELL SPECIFIC  MATERIAL TYPE
       LINER GENERIC MATERIAL TYPE
       LINER SPECIFIC  MATERIAL TYPE

 ** REAGENT PREPARATION  EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE

 *» PUMPS
     SERVICE
 1
12/81
 9/81
 0/77
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
'NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 NR
 MIX TANK
 N/A
 AGITATED TANK
 NUMBER

 ****
                                             13-1297

-------
UTILITY FGO SURVEY: OCTOBER 1983 - SEPTEMBER

UTAH POWER & LIGHT: NAUGHTON 3 (CONT.)
 ** SOLIDS CONCENTRATING/DEWATERING
     DEVICE                                     MR

*** SLUDGE

 ** TREATMENT
     METHOD                                     NR
     DEVICE                                     NR
     PROPRIETARY PROCESS                        NR

 ** DISPOSAL
     NATURE                                     NR
     TYPE                                       NR
     SITE TREATMENT                             NR
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


  9/81  SYSTEM                                                                720

       «*  PROBLEMS/SOLUTIONS/COMMENTS

                         OPERATION OF THE FGD SYSTEM INSTALLED ON NAUGHTON 3 BEGAN IN SEPTEMBER
                         1981. THE SYSTEM IS CURRENTLY IN THE START-UP PHASE OF OPERATION AND IS
                         NOT REQUIRED TO BE IN FULL SERVICE UNTIL THE END OF THE YEAR. SOME INITIAL
                         DAMPER PROBLEMS WERE REPORTED.

10/81  SYSTEM                                                                744

11/81  SYSTEM                                                                720

12/81  SYSTEM                                                                744

  1/82  SYSTEM                                                                744

  2/82  SYSTEM                                                                672

  3/82  SYSTEM                                                                744

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT FOR THE FIRST QUARTER 1982 THE FGD AVAILABILITY
                         AVERAGED GREATER THAN 90X.

  4/82  SYSTEM                                                                720

  5/82  SYSTEM                                                                744

  6/82  SYSTEM                                                                720

       **  PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT FOR THE SECOND QUARTER THE FGD AVAILABILITY
                         AVERAGED GREATER THAN 90X.

  7/82  SYSTEM                                                                744

  8/82  SYSTEM                                                                744

  9/82  SYSTEM                                                                720

10/82  SYSTEM                                                                744

11/82  SYSTEM                                                                720
                                             13-1298

-------
                                                  UTILITY F6D SURVEY: OCTOBER 1983 - SEPTEMBER 1984

UTAH POWER t LIGHT: NAUGHTON 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


12/82  SYSTEM                                                                744

 1/83  SYSTEM                                                                744

 2/83  SYSTEM                                                                672

 3/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION MAS UNAVAILABLE FOR THE PERIOD OF JULY 1982 THROUGH MARCH 1983.

 4/83  SYSTEM                                                                720

 5/83  SYSTEM                                                                744

 6/83  SYSTEM                                                                720

       «* PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION MAS UNAVAILABLE FOR THE PERIOD OF JULY 1982 TO JUNE 1983.

 7/83  SYSTEM                                                                744

 8/83  SYSTEM                                                                744

 9/83  SYSTEM                                                                720

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED  THAT NO FGD-RELATED OUTAGES HERE ENCOUNTERED DURING
                         THE  THIRD  QUARTER  OF  1983.

                         THE  UTILITY REPORTED  PLUGGING  PROBLEMS IN THE PRESATURATOR HEADERS AND
                         NOZZLES.   THIS IS  BELIEVED TO  BE DUE TO INSUFFICIENT FLOW AND PIPE CONFIGU-
                         RATION  (TOO MANY ELBOWS). THE  UTILITY IS GOING TO EXPERIMENT BY RUNNING THE
                         FGD  SYSTEM WITHOUT THE  PRESATURATOR.  UNIT WAS AVAILABLE APPROXIMATELY 70X
                         OF THE  PERIOD.  THE UTILITY REPORTED THAT LOM UNIT AVAILABILITY ACCOUNTS
                         FOR  A MAJORITY OF  FGD PROBLEMS DUE TO RESTART COMPLICATIONS.

 10/83  SYSTEM                                                                744

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THE  FGD SYSTEM MAS DOWN DURING THE FIRST TWO WEEKS OF OCTOBER DUE TO A RUP-
                         TURED EFFLUENT LINE TO  THE EVAPORATION POND.

 11/83  SYSTEM                                                                720

 12/83  SYSTEM                                                                744

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         THE  UTILITY REPORTED  THAT THE  FGD SYSTEM HAS ONLY OPERATED APPROXIMATELY
                         30 DAYS DURING THE FOURTH QUARTER DUE TO TURBINE PROBLEMS ON  THE UNIT.

                         THE  UTILITY EXPERIENCED RECYCLE  PUMP PROBLEMS DURING THE FOURTH QUARTER.
                         SPECIFICALLY, WORN SLEEVES AND VIBRATION PROBLEMS.

 1/84  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744



                                             13-1299

-------
UTILITY FGD SURVEYS OCTOBER 1983 - SEPTEMBER 1984

UTAH POWER & LIGHT: NAUGHTON 3 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                502  PART. HOURS HOURS  HOURS FACTOR


 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE RECYCLE PUMP WAS REPLACED WITH A LARGER UNIT AT NAUGHTON 3 TO REDUCE
                         VIBRATION.

                         ESP CONTROLS WERE INOPERATIVE FOR APPROXIMATELY ONE WEEK DURING THE FIRST
                         THREE QUARTERS OF 1984 FORCING THE FGD SYSTEM OUT OF SERVICE.

                         DAMPER PROBLEMS WERE REPORTED DURING THE FIRST THREE QUARTERS OF 1984.
                         BENT SHAFTS AND LIMIT TORQUES WERE PREVENTING THE INLET LOUVERS FROM
                         CLOSING PROPERLY.

                         OVERALL FGD SYSTEM AVAILABILITY DURING THE FIRST THREE QUARTERS OF 1984
                         WAS ESTIMATED AT 90 TO 95X.

                         SLURRY TANK HEATERS BURNING OUT CONTRIBUTED TO FGD SYSTEM OUTAGE TIME DUR-
                         ING THE FIRST THREE QUARTERS OF 1984. THE RESULTING LOWERED TEMPERATURE OF
                         THE SODA  LIQUOR CAUSED CRYSTALLIZATION OF THE SLURRY.

                         THE UTILITY REPORTED PROBLEMS WITH PLUGGED PRESATURATOR SPRAY NOZZLES DUE
                         TO POOR CLARIFIER OPERATION.
                                             13-1300

-------
                                                  UTILITY F6D SURVEY:  OCTOBER  1983  -  SEPTEMBER
                                           SECTION 13
               DESIGN AND PERFORMANCE DATA FOR OPERATIONAL DOMESTIC F6D SYSTEMS
COMPANY NAME
PUNT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NOX EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY H/FGD - MM
NET UNIT GENERATING CAPACITY MO/FGD - MM
EQUIVALENT SCRUBBED CAPACITY - MM
 ** UNIT DATA - BOILER AND STACK
     BOILER SUPPLIER
     BOILER TYPE
     BOILER SERVICE LOAD
     DESIGN BOILER FLUE GAS FLOM
     BOILER FLUE GAS TEMPERATURE
     STACK HEIGHT - M
     STACK SHELL
     STACK TOP DIAMETER - M
CU.M/S
C
 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - J/G
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - '/.
     RANGE ASH CONTENT - 7.
     AVERAGE MOISTURE CONTENT - 7.
     RANGE MOISTURE CONTENT - 7.
     AVERAGE SULFUR CONTENT - 7,
     RANGE SULFUR CONTENT - 7.
     AVERAGE CHLORIDE CONTENT - 7.
     RANGE CHLORIDE CONTENT - 7.

*** PARTICLE CONTROL

 ** ESP
     NUMBER
     INLET FLUE GAS CAPACITY - CU.M/S
     INLET FLUE GAS TEMPERATURE - C
     PARTICLE REMOVAL EFFICENCY - X

 *« PARTICLE SCRUBBER
     NUMBER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON NAME
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     GAS CONTACTING DEVICE TYPE

*** FGD SYSTEM

 *« GENERAL DATA
     SALEABLE PRODUCT/THROWAMAY PRODUCT
     S02 REMOVAL MODE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     UNIT DESIGN S02 REMOVAL EFFICIENCY  -  7.
             WEST PENN POMER
             MITCHELL
             33
             COURTNEY
             PENNSYLVANIA
             A
                43.          (
               193.          (
                  .100 LB/MMBTU)
                  .450 LB/MMBTU)
             ******
                            (*»*«**  LB/MMBTU)
               300
               291
               294
               300
******
PULVERIZED COAL
BASE
  613.47
  148.9
******
NR
*******
(1300000 ACFM)
(  300 F)
<**** FT)

(***** FT)
                            (  12520  BTU/LB)
                             10770-13310
                            (1300000 ACFM)
                            (   308 F)
COAL
BITUMINOUS
29122.

   12.50
6.3-15.2
    5.50
4.0-8.9
    2.80
1.8-3.2
********
0.00-0.10
  613.5
  153.3
   99.5
              0
             NONE
             N/A
             N/A
             N/A
             N/A
             N/A
             N/A
             N/A
             THROMAMAY PRODUCT
             WET SCRUBBING
             LIME
             GE ENVIRONMENTAL SERVICES
             GIBBS « HILL
             FULL SCALE
             RETROFIT
                95.00
                                             13-1301

-------
UTILITY FGD SURVEY: OCTOBER 1983 - SEPTEMBER 1984

WEST PENN POWER: MITCHELL 33 (CONT.)
     ENERGY CONSUMPTION - X
     CURRENT STATUS
     COMMERCIAL START-UP
     INITIAL START-UP
     CONTRACT AWARDED

 ** DESIGN AND OPERATING PARAMETERS

 *« QUENCHER/PRESATURATOR
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 ** ABSORBER
     NUMBER
     NUMBER OF SPARES
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     SUPPLIER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL
     SHELL SPECIFIC MATERIAL
     SHELL MATERIAL TRADE NAME/COMMON TYPE
     LINER GENERIC MATERIAL
     LINER SPECIFIC MATERIAL
     LINER MATERIAL TRADE NAME/COMMON TYPE
     GAS CONTACTING DEVICE TYPE
     NUMBER OF CONTACTING ZONES
     LIQUID RECIRCULATION RATE - LITER/S
     L/G RATIO - L/CU.M
     GAS-SIDE PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/SEC

 ** MIST ELIMINATOR
     PRE-MIST ELIMINATOR/MIST ELIMINATOR
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONFIGURATION
     NUMBER OF.PASSES PER STAGE
     PRESSURE DROP - KPA
     SUPERFICAL GAS VELOCITY - M/S
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     WASH WATER SOURCE
     WASH RATE - L/S

 *» REHEATER
     GENERIC TYPE
     SPECIFIC TYPE
     TRADE NAME/COMMON TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE

 »* FANS
     DESIGN
     FUNCTION
     APPLICATION
     SERVICE
     CONSTRUCTION MATERIAL GENERIC TYPE

 ** DAMPERS
     FUNCTION
     GENERIC TYPE
     SPECIFIC TYPE
     CONSTRUCTION MATERIAL GENERIC TYPE
     CONSTRUCTION MATERIAL SPECIFIC TYPE
     LINER GENERIC MATERIAL TYPE
     LINER SPECIFIC MATERIAL TYPE
    1.0
 1
 9/82
 8/82
 9/79
NR
NR
 3
 1
SPRAY TOWER
OPEN COUNTERCURRENT SPRAY
N/A
GE ENVIRONMENTAL SERVICES
33.5 DIA X 97.5
CARBON STEEL
AISI 1110
N/A
ORGANIC
GLASS FLAKE-FILLED POLYESTER
FLAKELINE 103
NONE
 6
   28.         (
   12.0        (
     .6        (
    3.0        (
 452 GPM)
90.0 GAL/1000 ACF)
2.5 IN-H20)
10.0 FT/S)
PRIMARY COLLECTOR
IMPINGEMENT
BAFFLE
CLOSED VANE
HORIZONTAL
    4
     .1        (  .4 IN-H20)
    3.0        ( 10.0 FT/S)
ORGANIC; STAINLESS STEEL
POLYPROPYLENE; AUSTENITIC
FRESH
    6.1        (97 GAL/MIN)
NR
NR
NR
NR
NR
CENTRIFUGAL
BOOSTER
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
                                             13-1302

-------
WEST PENN POWER: MITCHELL 33 (CONT.)
                                                  UTILITY F6D SURVEY:  OCTOBER 1983 - SEPTEMBER 1984
 »* DUCTWORK
      SHELL GENERIC MATERIAL TYPE
      SHELL SPECIFIC MATERIAL TYPE
      LINER GENERIC MATERIAL TYPE
      LINER SPECIFIC MATERIAL TYPE

 ** REAGENT PREPARATION EQUIPMENT
     FUNCTION
     DEVICE
     DEVICE TYPE
     MANUFACTURER
     NUMBER
     PRODUCT QUALITY - X SOLIDS

 ** TANKS
     SERVICE
     THICKENER UNDERFLOW
     VACUUM FILTER FILTRATE
     FIXATION ADDITIVE
     FLYASH
     HASTE SLURRY BLEED
     REAGENT PREP PRODUCT
     ABSORBER RECYCLE
     THICKENER OVERFLOW

  **  PUMPS
     SERVICE
     ABSORBER RECIRCUUTION
     ABSORBER BLEED
     FIXATION ADDITIVE
     ALKALI PREPARATION AREA SUMP
     ABSORBER AREA SUMP
     THICKENER AREA SUMP
     VACUUM FILTRATE
     VACUUM FILTER FEED
     VACUUM
     LIME SLURRY
     THICKENER UNDERFLOW
     THICKENER OVERFLOW

  »*  SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     NUMBER OF SPARES
     CAPACITY
     SHELL GENERIC MATERIAL TYPE
     OUTLET STREAM CHARACTERISTICS

  *»  SOLIDS CONCENTRATING/DEWATERING
     DEVICE
     NUMBER
     DIMENSIONS - FT
     SHELL GENERIC MATERIAL TYPE
     FEED STREAM CHARACTERISTICS
     OUTLET STREAM CHARACTERISTICS

 «**  SLUDGE

  **  TREATMENT
     METHOD
     DEVICE
     PROPRIETARY PROCESS

  **  DISPOSAL
     NATURE
     TYPE
CARBON STEEL
AISI 1110
ORGANIC
GLASS FLAKE-FILLED POLYESTER
SLAKER
NR
NR
WALLACE t TIERNAN
 3
   15.0
                                                NUMBER
   1
   1
   Z
   1
   1
   1
   3
   1
NUMBER

  18
   6
   2
   2
   2
   2
****
****
*»*«
   2
   2
   2
VACUUM FILTER
 2
1
888 TON/DAY
CARBON STEEL
BOX SOLIDS
THICKENER
 1
139.0 DIA X 12.0
CARBON STEEL
10X SOLIDS
20X SOLIDS
NR
NR
NR
NR
NR
                                             13-1303

-------
UTILITY FGO SURVEY! OCTOBER 1983 - SEPTEMBER 1984

WEST PENN POWER: MITCHELL 33 (CONT.)
     SITE TREATMENT

 ** PROCESS CONTROL AND INSTRUMENTATION
     CONTROL LEVELS
     PROCESS CONTROL MANNER
     PROCESS CHEMISTRY MODE
                                                NR
                                         PH,  RECYCLE TANK LEVEL
                                         AUTOMATIC
                                         FEEDBACK
 ** WATER BALANCE
     MAKEUP WATER ADDITION - LITERS/S
                                            28.3
                                             (   450 GPM)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  '/, REMOVAL   PER  BOILER  FGD   CAP.
                                                                502  PART. HOURS HOURS  HOURS FACTOR
 8/82  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
                                                                             744
                         THE UTILITY REPORTED THAT INITIAL START-UP FOR THE FGD SYSTEM OCCURRED
                         DURING AUGUST.
  9/82  SYSTEM

 10/82  SYSTEM

 11/82  SYSTEM

 12/82  SYSTEM

       »*  PROBLEMS/SOLUTIONS/COMMENTS
                                                                      720

                                                                      744

                                                                      720

                                                                      744
                         DURING THE PERIOD OF AUGUST 1982 THROUGH DECEMBER 1982, THE PLANT WAS
                         UNDERGOING SHAKEDOWN/DEBUGGING OPERATIONS.
  1/83
        F-101
        F-201
        F-301
        SYSTEM
              .0
           100.0
           100.0
           100.0
               .0
            100.0
            100.0
            100.0
            100.0
            100.0
            100.0
               .0
             48.7
             48.7
             48.7
                                                                             744   361
                                                                                          362  35.7
        **  PROBLEMS/SOLUTIONS/COMMENTS
  2/83
  3/83
F-101
F-201
F-301
SYSTEM

F-101
F-201
F-301
SYSTEM
 65.3
100.0
 34.7
100.0

100.0
100.0
   .0
100.0
                         DURING JANUARY THE BOILER WAS OFF FOR A PERIOD OF TIME TO INSPECT THE
                         GENERATOR.
 65.3
100.0
 34.7
100.0

100.0
100.0
   .0
100.0
           PROBLEMS/SOLUTIONS/COMMENTS
100.0
100.0
100.0
100.0

100.0
100.0

100.0
                                                       65.3
                                                      100.0
                                                       34.7
                                                      100.0
                                                      100.0
                                                      100.0
                                                          .0
                                                      100.0
                                                                             672   672
                                                                              744   677
                                                                                          672   78.6
                                                                                           744   72.5
                          THE  UTILITY  REPORTED  THAT NO MAJOR  FGD-RELATED  PROBLEMS  WERE  ENCOUNTERED
                          DURING  FEBRUARY  OR MARCH.
  4/83
  5/83
F-101
F-301
F-301
SYSTEM

F-101
F-201
F-301
SYSTEM
100.0
 75.6
 24.4
100.0

100.0
   .0
100.0
100.0
100.0
100.0
100.0
100.0

100.0
   .0
100.0
100.0
100.0
100.0
100.0
100.0

100.0

100.0
100.0
100.0
 75.6
 24.4
100.0

100.0
   .0
100.0
100.0
                                                                              720
                                                                                     93
                                                                              744    617
                                                                                           720   79.1
                                                                                           744  62.2
                                             13-1304

-------
                                                  UTILITY FSO SURVEY: OCTOBER 1983 - SEPTEMBER

WEST PENN POWER: MITCHELL 33 (CONT.)
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
6/83



F-101
F-201
F-301
SYSTEM
26.7
73.3
100.0
100.0
26.7
73.3
100.0
100.0
100.0
100.0
100.0
100.0
26.7
73.3
100.0
100.0



720 720 720 82.8
       ** PROBLEMS/SOLUTIONS/COMMENTS

                         THE UTILITY REPORTED THAT NO MAJOR FGD-REUTED PROBLEMS WERE ENCOUNTERED
                         DURING THE PERIOD OF APRIL THROUGH JUNE, 1983.

 7/83  SYSTEM                                                                744

 8/83  SYSTEM                                                                744

 9/83  SYSTEM                                                                720

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE THIRD QUARTER OF 1983.

 10/83  SYSTEM                                                                744

 11/83  SYSTEM                                                                720

 12/83  SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE FOURTH QUARTER OF 1983.

 1/84  SYSTEM                                                                744

 2/84  SYSTEM                                                                696

 3/84  SYSTEM                                                                744

 4/84  SYSTEM                                                                720

 5/84  SYSTEM                                                                744

 6/84  SYSTEM                                                                720

 7/84  SYSTEM                                                                744

 8/84  SYSTEM                                                                744

 9/84  SYSTEM                                                                720

       *» PROBLEMS/SOLUTIONS/COMMENTS

                         INFORMATION WAS UNAVAILABLE FOR THE  FIRST THREE  QUARTERS OF 1984.
                                             13-1305

-------
                                   TECHNICAL REPORT DATA
                            (Please read Instructions on the reverse before completing)
  REPORT NO.
   EPA 340/1-85-014c
             3. RECIPIENT'S ACCESSION NO.
4. TITLE AND SUBTITLE
    Utility FGD Survey
    October 1983 - September  1984
    Volume  2, Part 2
             5. REPORT DATE
               October 1984
             6. PERFORMING ORGANIZATION CODE
7. AUTHOR(S)
                                                           8. PERFORMING ORGANIZATION REPORT NO.
   M.T.  Melia, R.S. McKibben,  B.W.  Pelsor
9. PERFORMING ORGANIZATION NAME AND ADDRESS
   PEDCo Environmental, Inc.
   11499 Chester toad
   Cincinnati, OH  45246-0100
             10. PROGRAM ELEMENT NO.
             11. CONTRACT/GRANT NO.

              68-02-3963,  Task No.  46
12. SPONSORING AGENCY NAME AND ADDRESS
    U.S.  Environmental Protection Agency
    Stationary Source Compliance Division (EN-341)
    401 M Street, S.W.
    Washington, D.C.  20460	
             13. TYPE OF REPORT AND PERIOD COVERED
               Final, Oct.  1983-Sept. 1984
             14. SPONSORING AGENCY CODE
15. SUPPLEMENTARY NOTES
   Summarized in EPA 340/1-85-014  - Utility FGD Survey Summary
   EPA Task Manager - Sonya Stelmack  (202)  382-2851	
16. ABSTRACT
         This report, which.is generated by a computerized data base system,
   represents a survey of operational and planned domestic utility flue gas
   desulfurization  (FGD) system.   The three volume set summarizes information
   contributed by the utility industry, system and equipment suppliers, system
   designers/ research organizations, and regulatory agencies.  The data  cover system
   design,  fuel characteristics, operating history, and actual system performance.
   Also included is a unit-by-unit discussion of problems and solutions associated
   with the boilers, scrubbers, and  FGD systems.

         The development status  (operational, under construction, or in the planning
   stages), system supplier, process, waste disposal practice, and regulatory class
   are tabulated alphabetically by utility company.  Simplified process flow diagrams
   of FGD systems, definitions, and  a glossary of terms are attached  to the  report.
   Current data for domestic FGD systems show 124 systems in operation, 25 systems
   under construction, and 68 systems planned.  The current PGD-controlled capacity
   in the United States is 47,255  *W.
17.
                                KEY WORDS AND DOCUMENT ANALYSIS
                  DESCRIPTORS
b.IDENTIFIERS/OPEN ENDED TERMS  C. COSATI Field/Group
18. DISTRIBUTION STATEMENT
    Release unlimited
19. SECURITY CLASS (ThisReport/
 unclassified
                                                                         21. NO. OF PAGES
20. SECURITY CLASS (Thispage)

 unclassified
22. PRICE
  A To  2220-1 .

-------