EPA-460/9-73-001
       AUTOMOTIVE GAS TURBINE
           ECONOMIC ANALYSIS

      Investment  Cast Turbine Wheel
                  Supplement
        U.S. ENVIRONMENTAL PROTECTION AGENCY
             Office of Air and Water Programs
        Office of Mobile Source Air Pollution Control
     Advanced Automotive Power Systems Development Division
              Ann Arbor, Michigan  48105

-------
                           EPA-460/9-73-001

AUTOMOTIVE  GAS TURBINE

     ECONOMIC ANALYSIS


Investment Cast Turbine  Wheel

             Supplement

                Prepared By
           Robert T. Hall, G. Music
          Williams Research Corporation
             2280 W. Maple Road
          Walled Lake, Michigan   48088
           Contract No. 68-01-0405
             EPA Project Officer:


               William C. Cain
               Prepared For

       U.S.  ENVIRONMENTAL PROTECTION AGENCY
        Office of Air and Water Programs
    Office of Mobile Source Air Pollution Control
   Advanced Automotive Power Systems Development Division
             Ann Arbor, Michigan  48105
                 July 1973

-------
This report is issued by the Office of Mobile Source Air Pollution
Control, Office of Air and Water Programs, Environmental Protection
Agency, to report technical data of interest to a limited number of
readers.  Copies of this report  are available free of charge to
Federal employees, current contractors and grantees, and non-profit
organizations - as supplies permit - from the Air Pollution Techni-
cal Information Center, Environmental Protection Agency, Research
Triangle Park, North Carolina  27711 or may be obtained, for a
nominal cost, from the National Technical Information Service,
5285 Port Royal Road, Springfield, Virginia  22151.
This report was furnished to the U. S. Environmental Protection
Agency by Williams Research Corporation in fulfillment of Contract
No. 68-01-0405 and has been reviewed and approved for publication by
the Environmental Protection Agency.  Approval does not signify that
the contents necessarily reflect the views and policies of the agency.
The material presented in this report may be based on an extrapola-
tion of the "State-of-the-art".  Each assumption must be carefully
analyzed by the reader to assure that it is acceptable for his pur-
pose.  Results and conclusions should be viewed correspondingly.
Mention of trade names or commercial products does not constitute
endorsement or recommendation for use.
                     Publication No.  EPA-460/9-73-001

-------
                                     Report No. WR-ER11
                                     Revision No. 1
                      SUPPLEMENT


                AUTOMOTIVE GAS TURBINE

                   ECONOMIC ANALYSIS



            INVESTMENT CAST TURBINE WHEEL



            ENVIRONMENTAL PROTECTION AGENCY


ADVANCED AUTOMOTIVE POWER SYSTEMS DEVELOPMENT DIVISION

                  2929 PLYMOUTH ROAD

               ANN ARBOR, MICHIGAN 48105
                         FROM
             WILLIAMS RESEARCH CORPORATION

                  2280 W. MAPLE ROAD

             WALLED LAKE, MICHIGAN  48088

-------
                           FOREWORD
THIS REPORT, NO. WR-ER11, REVISION NO. 1 ENTITLED "SUPPLE-

MENT, AUTOMOTIVE GAS TURBINE ECONOMIC ANALYSIS, INVESTMENT

CAST TURBINE WHEEL" IS SUBMITTED TO THE ENVIRONMENTAL PRO-

TECTION AGENCY, DIVISION OF ADVANCED AUTOMOTIVE POWER SYSTEMS

DEVELOPMENT.  THE REPORT IS SUBMITTED PURSUANT TO CONTRACT

NO. 68-01-0405 BETWEEN THAT AGENCY AND WILLIAMS RESEARCH

CORPORATION AND IS BASED ON ALL WORK ACCOMPLISHED UNDER

THAT CONTRACT.
R. T. Hall                              E. E. Davenport
Project Director                        Director of Administration

-------
                      TABLE OF CONTENTS




                                                            Page



SUMMARY	   1






INTRODUCTION	   2






GENERAL PROCESS DESCRIPTION	   4




     Manufacturing Assumptions	   5




     Investment Patterns	   6




     Shell Molding	   7




     Refractory Mold Burnout, Assembly and Firing	   9



     Master Ingot Melting	  10




     Production Melting and Casting	  11



     Cooling,  Shakeout and Cleaning	  14



     Finishing Operations	  16






COST SUMMARY	  17



     Raw Materials	  18



          Metal Production Costs - IN713LC	  18



          Shell Cost Summary	  20



     Plant and Equipment	  25



     Manpower Requirement	  25



     Turbine Wheel Cost	  45






OPTIONAL ALLOY IN-738 SUPPLEMENT	  47



     Optional Heat Treating	  48






ACKNOWLEDGMENTS	  53






ADDENDUM 1 - AUTOMATED INVESTMENT CASTING IN THE USSR	  54






ADDENDUM 2 - ALLOY SUMMARIES, 713LC/IN-738	  59

-------
                           SUMMARY








1.   This study provides adequate evidence that volume pro-



     duction of automotive turbine wheels investment cast



     in nickel base alloys is both feasible and within the



     current state of the art.








2.  This study has generated a logical process for mass



     producing investment cast turbine wheels and also pro-



     vides the necessary capitalization requirement to support



     such a manufacturing capability.







3.   The cost analysis supports the original premise of an



     80%-20% material to labor ratio.  In addition the capital-



     ization, manloading and resultant overhead considerations



     are well within automobile industry standards.








4.   The O.E.M. selling price per turbine wheel mass produced



     at the projected study levels would be approximately $10.04



     to $12.15 each dependent on alloy selection.








5.   The capitalization of a facility to investment cast



     2,000,000 turbine wheels per year would cost approximately"



     $12,000,000 to $15,000,000, dependent on alloy selection.

-------
                          SECTION I





                        INTRODUCTION








The Automotive Gas Turbine Economic Analysis Final Report,




dated December 1972, used an existing prototype automotive




turbine engine as a baseline.  This engine was analyzed




in detail for its producibility, utilizing value analysis




techniques to further refine the engine for mass production.



Manufacturing processes were studied for their applicability




to turbine engine components, and a development program



was outlined to foster process development for those areas



defined as high cost items.








One high cost area identified was that of investment castings



used in the automotive turbine engine.  A specific area



of concern was the cost of investment turbine wheels after



vendor prices were obtained for production rates of 1,000,000



castings per year.  These vendor prices indicated an unreasonable



proportion of labor cost to material cost.








Based on the material content of the turbine wheels, an



Automotive Original Equipment Manufacturer (OEM) selling



price of $14.00 each was developed.  Some comments ensued



regarding the assumptions made to arrive at this price;



and in response to these comments, the Environmental Protection



Agency authorized a more detailed analysis of the cost of



investment castings produced in automotive quantities.

-------
Although current prices for investment castings in the United



States might indicate that precision parts made by this



method have no place in the automotive sector, it should



be noted that investment castings are used extensively for



automotive applications in Europe.  Specific attention is



directed to the highly automated Gorky Automotive Works,



an investment foundry in Russia, which produces approximately



15,000,000 castings per year for the industry.  (See addendum



#1 for details.)








A detailed description of the Gorky Operation was furnished



by Technology Associates, Inc. of Dedham, Mass.; and an



evaluation of these data definitely indicates that high-



volume , automated investment foundries can produce certain



types of investment castings at low cost.  In addition,



there has been progress in the United States on the part



of several material suppliers to develop binder processes



that will reduce the time required to build investment shell



molds. A typical process; developed by the E.I.duPont Company,



trade name Colal; elimates the necessity of drying the shell



between dips.







After considering these binder developments and the advanced



automation techniques of the Gorky Foundry, it has been con-



cluded that the investment casting process may, in fact,



offer the best solution to the problem of manufacturing



turbine wheels at a cost acceptable to the automotive industry,

-------
For purposes of this study, a conceptual investment casting



process, suitable for volume production of automotive turbine



wheels, has been developed.  This process includes the physical



and cost elements of a production facility, equipment, manpower,



raw material, and all other significant manufacturing elements



necessary to develop a meaningful unit cost for automotive



turbine wheels.  This supplement to the original report presents



the details of this process and the associated cost analysis.








GENERAL PROCESS DESCRIPTION
The proposed investment casting process is based on fundamental



investment casting expertise utilizing, where applicable,



developments in fast drying binders, typical high volume



production automation and some modestly innovative production



melting techniques to produce low cost turbine wheels.








The pattern materials are polystyrene or polystyrene/wax



utilized in multi wheel assemblies.  The shell making is



accomplished in an automated continuous slurry/stucco dip



system using a binder system which precludes long intermediate



drying cycles during the building steps.








Melting is carried out in two steps; the first to alloy master



heat ingots, and the second to accomplish production melting



for the final casting operation.  Some innovations, as described

-------
in the detailed process, develop practical solutions for



shell support during the pouring operation to accommodate



heat retention and withstand the forces applied to the shell



resulting from the proposed centrifugal assist.








The finishing operations such as cleaning, inspection, cutting,



and heat treatment, use either current or modifications of



current production techniques.








For purposes of identification the following detail process



description  is broken down into the basic manufacturing



techniques.  These are:







     Investment Pattern making



     Shell making



     Master heat melting



     Production melting



     Cooling, shakeout, and cleaning



     Cutting, final inspection and shipping








In addition, the processing includes an optional heat treat



operation to support alloy IN738.








Manufacturing Assumptions




1.   The refractory mold technique utilizes binder systems



     which do not require intermediate drying between refractory



     layers.

-------
2.   The melting operations are carried out in two stages.



     The first to produce ingot and the second the production



     casting.  Direct melting costs are $0.03/pound for ingot



     and $0.05/pound for the production melt.



3.   The system is designed to eliminate labor where practical



     by use of automatic production techniques.



4.   The production foundry will operate 250 days, two 8-hour



     shifts, 5 days per week.  Additional maintenance is



     planned for furnace overhaul and system maintenance.    The



     primary master ingot furnace and any heat treating facili-



     ties will operate 250 days, three 8-hour shifts, 5 days per



     week.



5.   Direct labor rates are assumed to be $7.50/hr., including



     fringes.



6.   Capital depreciation on all facilities except building at



     12 years.  Building carried 20 years.



7.   General and administrative costs at 10 percent.



8.   Corporate profit at 25 percent.








Investment Patterns








The first step of the detailed process concerns itself with



the manufacture of the subassembly patterns which in final



assembly will be used for building the refractory shell.







The material/s are polystyrene and/or polystyrene wax combinations,



All parts are made using high production rate injection molding



equipment.

-------
The turbine wheel pattern is injection molded in one piece



polystyrene using a movable segment water cooled mold.  These



machines are fully automatic and in sufficient quantity to pro-



duce in excess of 640 turbine wheel patterns per hour.








The balance of the assembly such as the central runner, pouring



cup patterns etc. are molded separately.  For a visual pre-



sentation of the pattern assembly see Figure 1.








After molding, the separate patterns are conveyed to an assembly



area where the components will be assembled manually using the



appropriate patterns and hooked to an overhead conveyor which



carries the assemblies to the shell molding area.








Shell Molding



The shell molding area consists of handling systems, slurry



tanks, stuccoing beds and drying areas designed to produce



110-125 mold assemblies per hour in an automated assembly



line.  Supporting equipment consists of batch slurry prepara-



tion and storage tanks, and refractory preparation, separation,



reconditioning and storage equipment.







The investment pattern assemblies are delivered to the shell



building area.  This area must be humidity and temperature



controlled.

-------
o: z o     z
D 5 < D  Z
   < J Z
       CD UJ  Ct
                                  J
                                  m
                                  2
                                  LJ
                                  m
                                  tn
                                  <

                                  z
                                  ce
                                  Ld
                                  H
                                  h
                         _     CL
                          LJ
                          cc
                          D
Ul
UJ
I
                                 Z

                                 m
                                 tc
                                 13
                                 H

-------
The assemblies are then dipped in a refractory slurry, re-
tracted and dipped in a fluidized bed of stuccoing sand.
The slurry coat is repeated and then alternately dipped and
stuccoed in the binder slurries until three to six coats
are built up.

After the final dip, the shell/pattern assemblies are carried
into a drying room and dried for approximately 15 hours.
The drying parameters will consist of temperature, humidity,  -
and air flow control.

After the drying cycle is complete the refractory molds are
conveyed to the next operation which is pattern burnout.

Refractory Mold Burnout, Assembly and Firing
The shell/pattern assemblies are transferred from the drying
room to the burnout/firing furnace.  This furnace is used
to burnout the polystyrene, fire the shell and preheat for
pouring.

Prior to firing, the shells are placed in ceramic canisters
(silicon nitride or similar) and supported with coarse refrac-
tory invested between the canister and the shell.  This assembly
is then placed on the furnace conveyor and fired to achieve
the desired temperature for pouring and to assure that all
pattern residue is removed.

-------
These assemblies are then conveyed hot to the production

furnace line for pouring.


Master Ingot Melting

The turbine wheel alloy is melted from virgin or reverted

material or a combination of same.


The master heat is considered a separate entity on off-

line operation.  This is done to allow total independence

from the production line and conversely the production line is

not directly dependent on the conversion furnace.  The ingots

are stockpiled to allow a reasonable amount of downtime for

furnace repair and production melting lead.


The melting procedure involves charging, melting, alloy ad-

justment and ingot pouring in a vacuum furnace.


The master heat total is 12,000-15,000 pounds and the daily

production requirement is 35,000 pounds plus.


The furnace charge is made up in an adjacent charge room.  All

materials are dry stored.  The charge bucket is transferred to

the vacuum furnace and the charge is then laid in the crucible

in preparation for melting.


The ingot molds are assembled at the pouring station within the

vacuum chamber.
                                                           10

-------
The vacuum chamber is sealed and the operating vacuum is es-



tablished.  The furnace temperature can be elevated during



pumpdown.








When the charge is molten, final alloy adjustments are made



using material already placed in a separate additive vacuum



lock.  Spectrographic samples are tested for alloy balance and



when all percentages are nominal, the furnace may be poured.








The complete heat is poured into ingot molds and allowed to



solidify.







After solidification is achieved, the vacuum chamber is opened



and the molds are removed to a stripping  (teardown) area.







The ingots are removed from the molds, cropped and cut into



production furnace charges of approximately 24 pounds each



and stored until needed.








An illustration of a typical ingot furnace may be found in



Figure 2.








Production Melting and Casting



The production melting line consists eight 50-pound capacity



electric induction vacuum furnaces (including two spares).



These furnaces are able to pour every 180 seconds.  They are



complete with three handling locks, one to charge the furnace,





                                                            11

-------
       FIGURE   2




MASTER  HEAT  INGOT  FURNACE

-------
the second to place the mold assembly into the pouring station



and the third to remove the casting from the furnace chamber.



Self-contained manipulators,  to move the shell and casting in



the vacuum chamber from and to the entry and exit locks after



vacuum is achieved, are included.  Centrifugal assist is in-



corporated in the pouring table,  in addition, there are



mechanical manipulators at the entry and exit locks and appro-



priate conveyors to deliver the assemblies to the separation



and shakeout equipment.








The pre-cut ingot charges are placed in a feed hopper or mag-



azine which releases a single billet charge which is transferred



into an induction coil.  The charge is preheated in the in-



duction coil to approximately 2250°F in atmosphere.  When temp-



 erature is achieved, the billet is moved from the induction



coil through the outer door of the charging lock.  The outer



door is closed, the lock pumped down and the charge pushed



from the lock into the backtilted furnace crucible.








After the furnace crucible is returned to the vertical  posi-



tion the preheated charge is brought to superheat temperature



(approximately 2650°F).  During this heating cycle the previous



casting (assembly) is locked out of the furnace through the



exit lock and a new shell/canister assembly is placed on the



pouring table.
                                                           13

-------
When the charge is at the proper superheat temperature, the



pouring sequence is initiated by tilting the furnace and



actuating the centrifugal drive.  After pouring, the centrif-



ugal drive is continued until the exit lock is ready for the



next charging sequence  (approximately 2 to 2-1/2 minutes).








See Figure 3 for furnace example.








Cooling, Shakeout and Cleaning



The cooling and shakeout portion of the production facility



consists of conveyors to remove all castings from the exit



locks of the production furnaces, an assembly separation



station and a shell/casting separation unit.  The shell



material is returned to the refractory preparation area



to be crushed, ground and separated for reuse.  The ceramic



canisters are returned to the canister preheater for reuse.








The casting assembly is mechanically positioned in the vacuum



furnace exit lock when the pouring sequence is complete.  The



interlock door is closed and the vacuum is released.  When



the outer exit lock door is open a mechanical manipulator



extracts the assembly and places it on a conveyor which carries



it to the assembly separation station.







At the separation station an extractor removes the casting from



the loose refactory/canister and places it on an overhead con-



veyor.  At the same time an arm dumps the coarse refractory out





                                                           14

-------
Ul
       FIGURE  3
PRODUCTION  MELTING  FURNACE

-------
of the canister.  The refractory is collected mechanically and



it and the canister are returned to the shell/canister assembly



station for reuse.








The casting is moved to the cooling/shakeout unit where the



shell is completely removed by vibration and high pressure



water jets.








The castings are carried to the cleaning unit by overhead



conveyor.  The refractory shell material is recovered in



coarse slurry form and is returned to the shell refractory



recycling unit.







The proposed recycling system consists of the appropriate



drying, crushing and screening equipment to process and grade



the fused silica for reuse.  Some loss is anticipated and a



summary of final yield may be seen on Page  24   of this report,








The cleaning operation consists of light etching and hot



water rinsing the castings and is a continuation of the



shakeout production line.







Finishing Operations



The castings are conveyed to a line of cutoff machines which



should be designed to automatically restrain, index and cut off



(by friction saws) the individual turbine wheels from the as-



cast stack.  The wheels drop on a soft conveyor and are sep-
                                                           16

-------
arated from the sprue which is returned to the charge room



for remelt.  The turbine wheels are dimensionally checked by



an automatic gaging system.








After inspection, the wheels are packaged, using individual



containers.








COST SUMMARY



The turbine wheel production level which established this cost



analysis is two million units per year.  This being based on



two wheels per engine and the original economic analysis based



on a production commitment of one million engines per year.







The Foundry operation to produce this quantity of wheels is



based on 250 operating days and two 8-hour shifts.  The excep-



tion to this is the ingot furnace which would operate on a



three shift basis.  This will produce a minimum of 630 wheels



per hour including an estimated 5% scrap.








To evaluate costs the following primary cost centers were



developed:








1.   Raw Materials



2.   Plant & Equipment Capitalization



3.   Manpower  (Direct Labor)



4.   Overhead, Administrative Fees and Profit
                                                            17

-------
Within each of those cost centers detailed breakdowns are



shown and appropriate tables are referenced as applicable.








Raw Materials



The first primary cost center which was considered is the



cost of raw materials; the various metallic constituents



making up the ingot charge, the refractory system for shells



including binder and wax/plastic pattern material.








Metal Production Costs - IN713LC
Nickel base alloy IN-713LC was used for pricing in the original



automotive turbine engine study.  This alloy is currently used



in the prototype engine.








The casting characteristics of the alloy support the primary



considerations of the manufacturing processes previously



described.







The cost of the alloy is evaluated using the sum total of the



required constituents of the alloy in forms that are compatible



with normal vacuum melting practices.  A summary of the con-



stituents, charge form and costs is found on Table I.  The



nominal current price per pound is $1.61.  In addition



$0.05/pound was added for melting cost at the ingot furnace.



A summary of annual ingot costs may be found on Table II.
                                                           18

-------
                         TABLE  I
MASTER HEAT-VIRGIN MATERIAL COST -
ELEMENT
C
Cr
Ni
Mo
Cb/Ta
Ti
Al
B
Zr
Price Per Lb.
%
0.05
12.50
74.00
4.20
2.20
0.80
6.10
0.01
0.10
= $3218.69
FORM
Powder
Electrolytic
Electrolytic
Pellet
Cb/Ta
Sheet Scrap
Sponge
Pig
Ni/B
Sponge
= $1.61 Ib.
COST/LB. ($)
0.50
1.15
1.53
3.70
6.63
1.37
0.28
3.25
3.52

IN713 LC
WT./TON (LB.)
1.0
250.0
1480.0
84.0
44.0
16.0
122.0
0.2
2.0
1999.2

                                                                   COST/TON ($)




                                                                     0.50




                                                                   287.50




                                                                  2260.00




                                                                   310.80




                                                                   291.72




                                                                    21.92






                                                                    34.16




                                                                     0.65




                                                                     7.04






                                                                  3218.69
 1999.2  Ib.



$1.61 Ib.

-------
Included in the above costs were the following manufacturing



assumptions:








     1.   Scrap  -  5%



          Sprue Returns  -  30%




     2.   Total Metal Loss



               Cutting Loss             3%



               Oxidation, Vaporization  5%



               Spillage                 2%



     3.   The per pound melting cost of $0.05/pound includes



          electrical power, coolant water, crucible repair



          and replacement and mold repair and replacement.








Using these assumptions the annual ingot production is shown



on Table II and the final cost is $1.89 per pound which



includes the primary ingot melting factor of $0.03/pound.








Shell Cost Summary



The shell building process was slightly more complex to analyze,



The wax plastic system worked out to cost $.03 per wheel or



about $0.01 per pound of metal and this is used for the purpose



of pricing in this analysis.







To develop the amount of binder/refractory which would be used



per pound of casting the following assumptions were made:



Volume of a typical  (6) wheel stack investment shell:
                                                          20

-------
                                       TABLE II




                         ANNUAL INGOT PRODUCTION-COST  SUMMARY




                                     ALLOY IN713LC
Description
Wgt/Annual/lbs,
Melt Cost/lb.
Metal Cost/lb,
Required Wgt.
  5,400,000
                                        ANNUAL INGOT COST-POUND
                         $1.89**
Annual Cost Total
Required Delivered
Product
Revert Metal
Total Metal
Loss
Virgin Metal
5,400
1,890
727
6,127
,000
,000
,000
,000
$0
0
0
0
.03
.08*
.03
.03
$1
.61
Transfer
1
1
.61
.61
$8,856
151
1,192
10,048
,000
,200
,280
,280
.00
.00
.00
.00

                          $10,199,480.00
*    Includes Reprocessing Cost + Melt Cost
**   Includes Average Cost of Delivered Product,  Revert Metal  and  Total  Metal Loss Replacement

-------
The wheel O.D. is approximately 5", and the irregular form

measures 27.5" long.  By assuming a V thick shell buildup

the volumetric relationship of the simple cylinder is:



               AO = AX x L = Volume

     Where     A0 = 25.97 m2

     and       AI = 21.65 in2

     and       L  = 27.5"



The volume therefore is 129.6 in3.



If this volume is then considered as essentially dry fused

silica  (after drying) at a density of 100 lb/ft3 or 0.0507 lb/in3

the weight of cylinder A0 - AI x L = 6.57 Ib.  This weight of

formed refractory shell is sufficient to produce a 22-23 pound

turbine wheel assembly.



The constituents of the shell system less the pattern material

were then developed in portional weights as follows:



Proportional Weight of Slurries (Est.):
     2 Prime Coats M-l        0.57 Lbs.
     3 Backup Coats M-2       3.00 Ibs.
     3 Backup Coats P-2       3.00 Ibs.

               Total Weight   6.57 Ibs.
                                                            22

-------
Thus the price breakdown of the entire refractory system is
as follows:

Price Breakdown by Weight:

     Colal M-l
          25 Ibs. Colal M @ .23/lb.
          17.7 Ibs. H20 <§ .001/lb.
          .02 Ibs. Antarox BL240
          100 Ibs. Fused Silica @ .18/lb.
                              Dry Shell per CWT

                                             Or
            $ 5.750
              0.020
              0.006
             18.000

            $23.776

            $  .238/lb,
     Colal M-2
          32 Ibs. of Colal M @ .23/lb.
          100 Ibs. of Fused Silica @ .18/lb.

                              Dry Shell per CWT

                                             Or
     Colal P-2
          35 Ibs. of Colal P @ .36/lb.
          100 Ibs. of Fused Silica @ .18/lb.

                              Dry Shell per CWT

                                             or
Gross Shell Cost:

     0.57 Ibs. M-l @ $0.238/lb.
     3.00 Ibs. M-2 @ $0.254/lb.
     3.00 Ibs. P-2 @ $0.306/lb.
                         Gross Total
$0.136
 0.762
 0.918

$1.816
            $ 7.36
             18.00

            $25.36

            $ 0.254/lb.



            $12.60
             18.00

            $30.60

            $  .306/lb,
                                                           23

-------
The manufacturing process is developed to recover part of the
refractory used in the shells and the following assumptions
were used:

     1.   The solids composed of various mesh sizes of fused
          silica can be recovered at $0.005/lb. plus capitali-
          zation expense.

     2.   The recovery percentage will be 90% minus 5% opera-
          tional loss or a net recovery of 85% of all fused
          silica used in the process.

               A shell with a dry weight of 6.57 Ibs.
               with 85% net recovery and a $0.005/lb.
               processing cost will be:

                                   6.57 Ibs.
                                x $ .18
                                  $1.183
                         less 15%  0.175

                                  $1.008
                    Less $.005/lb. 0.033

                    Process       $0.975 net recovery

By subtracting the net recovery from the gross refractory cost
per shell the  following refractory cost is developed.

Gross Material Cost:

                                  $1.816
               Net Recovery Return 0.975

        Net Mat'l. Cost Per Shell $0.841

Cost Per Turbine Wheel:

        $0.841 4 6 = $0.14

Cost Per Ib. of Cast Metal  (Useable)

        Wheel =2.7 Ibs.          $ .0506/lb.
                                                           24

-------
Finally for storage requirements the following monthly inventory

will be required:  Annual use/cost relationships may be found in

Table III.


     Binders         95,190 Pounds
     Silica (Fused) 170,000 Pounds
     Wetting Agent    3,350 Pounds


Plant & Equipment

The second major cost center to discuss is plant and equipment

capitalization.



The plant was laid out in rudimentary form (Figure 4), and

then basic pricing was applied on a blanket basis per Mid-

western area construction and approximate land costs (Table III

Page 40) .



The equipment called out in the facilities Summary Sheets

(Table III, Page 27 thru  40) are based on supplier infor-

mation.  However, portions of the transfer systems were

estimated by Williams Research Corporation Facilities

Engineering.  A grand total of facilities may be found on

Table III Page 27.



Manpower Requirement

The third primary cost center is the manpower requirement.

Using the operating assumptions, the manpower allocations

are broken down by shift operations, and three categories

of labor; direct hourly, indirect hourly and salary.  These

individual analyses are shown on Table IV, Pages 41 thru 44.

                                                           25

-------
              CHARGE ROOM
                                                      MOLD STRIPPER

                                                       STATION
                                                    FURNACE REPAIR
                                                                     INGOT CUTOF
                                                                     GS	
                     nrn!  Iron
                    ^ PATTERN SHOP
                                                                             O
                                  i
                   ^SHIPPING AND RECEIVING
                                              METALLURGICAL


                                               LABORATORY
                                                u u  .

                                              MAINTAINENCE
                                                          o
                                                          o
o
o
o
o
o
QSHELL PREPARATION
     ooo
                                                                            DRYING ROOM
                                                    PRODUCTION CASTING FURNACES
                                                                                   ITANNISTER /
                                                                                           SHELL
                                                                                           _ J



                                                                                           []
                             nnnna
                             DODDD
                             DDDDD
                                                                             BURNOUT AND FIRING FURNACES
                                                                                                  GENERAL OFFICES
to
                                     TURBINE  WHEEL  FOUNDRY
                                                      FIGURE 4

-------
                         TABLE III                SUMMARY
                                           TURBINE WHEEL FOUNDRY
                                       ESTIMATED COST OF FACILITIES
Item
A
B
C
D
E

F
G
H
I
J
K
L
Description & Reference
Pattern Making - Plastic
Shell Making
Dewax, Firing/Preheat Area
Ingot Melt Facility
Production Melting & Casting
Facility
Cooling, Shakeout & Cleaning
Finishing Facility
Shipping
Maintenance
Laboratories
Miscellaneous
Building & Grounds
Est. Cost Elec.
Unit Est. Cost Foundations & Erection Total HP or KVA
$ 823,500
1,180,000
559,000
1,823,000
2,185,000

384,000
1,386,000
169,500
55,000
355,000
105,000
2,304,000
                                                                Sub Total           $13,329,000
                                                                15% Engr. & Cont.     1,699,350
                                                                                    $]3,028,350
M
Heat Treat Alloy In-738
    tv)
                    Incl 15% Engr. & Cont.     2,473,075

GRAND TOTAL (INCLUDING HEAT TREAT OPTION)    $15,501,425

-------
            TABLE  III  (cont'd.)
TURBINE WHEEL FOUNDRY
ESTIMATED COST OF FACILITIES

Item
A
A-l
A-2
A- 3
A- 4
A-5
A-6
A- 7
A- 8

Description & Reference Unit
Pattern Making - Plastic
Plastic Injection Mold 8
Machines
Plastic Storage & Delivery 1
System
Soft Conveyor 100 Ft. @ 75
Blade/Ring Dies (Molds) 8
Nut & Pouring Cup - Dies/Molds 3
Room Atmosphere
Die Repair, Etc. (incl. B sec.) 1
Ass'y Tube


Est. Cost
Est. Cost Foundations & Erection Total

$30,000
17,500
7,500
50,000
10,000
30,000
15,000
12,000

$7,500 $300,000
8,000 25,000
7,500
400,000
30,000
4,000 34,000
15,000
12,000

Elec.
HP or KVA

40 KVA
100 HP
5 HP
15 HP
50 HP

30 HP
50 HP

                                                                                      $823.500
* Incl. Installation
   00

-------
           TABLE  III  (cont'd.)
TURBINE WHEEL FOUNDRY
ESTIMATED COST OF FACILITIES

Item
B
B-l
B-2
B-3
B-4
B-5
B-6
B-7

Description & Reference
Shell Making
Refractory Reconditioning
Batch Slurry Make-up System
Production Slurry Tanks
Drying Room Conveyor
Dip Manipulator Machines
Binder Storage
Drying Facility

Unit Est.

1 $250
40
70
100
16 25
75
50



Est. Cost
Cost Foundations & Erection Total

,000
,000
,000
,000
,000
,000
,000

$35,000 $285
20,000 60
30,000 100
40,000 140
60,000 460
75
10,000 60

.OOC
,000
,000
,000
,000
,000
,000



Elec.
HP or KVA

250
50
100
50
160
75
50

H
H
H
H
II
H
H

.P.
.P.
.P.
.P.
.P.
.P.
.P.
                                                                                        $1,180,000
* Incl. Installation
    to

-------
            TABLE  III  (cont'd.)
TURBINE WHEEL FOUNDRY
ESTIMATED COST OF FACILITIES

Item
C
C-5
C-6
C-7
C-8
C-9
C-10


Description & Reference Unit Est.
Dewax, Firing/Preheat Area
Firing & Preheat System
Cannister Preheat
Backup Sand Preheat
Shell/Cannister Backup Sand
Assembly Unit
Cannister Manipulator
Master Operator Console

$175
75
60
50
30
75


Cost Foundations &

,000
,000
,000
,000
,000
,000

$40
7
7
15
5
30



Est. Cost
Erection Total

,000
,000
,000
,000
,000
,000

$205
82
67
65
35
105

,000
,000
,000
,000
,000
,000


Elec.
HP or KVA

50
25
25
15
10
5

H.P.
H.P.
H.P.
H.P.
H.P.
H.P.
                                                                                      $559,000
Incl. Installation
      to
      o

-------
TABLE III (cont'd.)
TURBINE WHEEL FOUNDRY
ESTIMATED COST OF FACILITIES

Item
D
D-l

D-2
D-3
D-4
D-5
D-6
D-7
D-8

Description & Reference Unit
Ingot Melt Facility
12,000 - 15,000 Ingot Melt
Furnace Including Vacuum
System
Mold Stripping Station
Crucible Assembly
20-Ton Crane
Charge System
Cutoff & Cropping Machines 4
Walking Beam Table
(Ingot transfer)
Ingot Molds & Misc. Equip


Est. Cost Foundations & Erection
$1,100,000

50,000
50,000
125,000
80,000
10,000
30,000
100,000
$100,000

30,000
20,000
40,000
40,000
2,000
10,000



Est. Cost Elec.
Total HP or KVA
$1,200

80
70
165
120
48
40
100
,000 1200 KVA
=100 KVA*

,000 50 H.P.
,000
,000 35 H.P.
,000 100 H.P.
,000 40 H.P.
,000 15 H.P.
,000
                                                                          $1,823,000
 *  1200  KVA Main Power;  500 KVA Auxiliary Equipment

-------
           TABLE  III  (cont'd.)
                                           TURBINE WHEEL FOUNDRY
                                       ESTIMATED COST OF FACILITIES
Item   Description & Reference
                                             Est. Cost
Unit    Est. Cost   Foundations & Erection     Total
                                                   Elec.
                                                HP or  KVA
E      Production Melting & Casting
         Facility

E-l    Induction Vacuum
         Furnaces (50-lb.)

E-2    Preheat Induction Coils

E-3    Master Control Room

E-4    10-Ton Overhead Crane

E-5    Inject. & Extract.
         Cannister Assembly
         Manipulators

E-6    Hopper/Magazine (6) & Charging
         Devices
12
$125,000 ea.


  25,000 ea,

 250,000

  95,000

  25,000 ea.



  60,000
                              $20,000 ea.  $1,160,000
                               15,000
75,000
             1440  KVA*
30
50
15
5
,000
,000
,000
,000
180
300
110
360
,000
,000
,000
,000
300
20
25
180
KVA
H.P.
H.P.
H.P.
30 H.P.
           *  Includes power  and auxiliary equipment
                                                                                  $2,185,000
    to

-------
        TABLE III (cont'd.)
TURBINE WHEEL  FOUNDRY
ESTIMATED COST OF FACILITIES


Item
F
F-l
F-2
F-3
F-4
F-5
F-6


Description & Reference . Unit
Cooling, Shakeout & Cleaning
Facility
Cooling Tunnel
Dumping Manipulator
Cannister Return System
Sand Return System
Shakeout & Water Jet System
Cleaning System

Est. Cost Elec.
Est. Cost Foundations & Erection Total HP or KVA

$ 40,000 $12,000 $ 52,000 25 H.P.
35,000 10,000 45,000 15 H.P.
30,000 10,000 40,000 10 H.P.
20,000 12,000 32,000 20 H.P.
100,000 40,000 140,000 50 H.P.
60,000 15,000 75.000 50 H.P.
                                                                                    $384,000
OJ

-------
           TABLE III  (cont'd.)
                                           TURBINE WHEEL FOUNDRY
                                       ESTIMATED COST OF FACILITIES
Item   Description & Reference
                                             Est. Cost
Unit    Est. Cost   Foundations & Erection     Total
                             Elec.
                           HP or KVA
G      Finishing Facility

G-l    Cutoff Units

G-2    Cleaning System

G-3    Final Inspection Station

G-4    Automatic Packaging Unit
          $ 50,000 ea.

            50,000

           950,000

            75,000
$12,000

 14,000

 75,000

 10,000
 $212,000

   64,000

1,025,000

   85,000
120 H.P,

 25 H.P,

  5 H.P,

 25 H.P,
                                                                                  $1,386,000
    OJ

-------
      TABLE  III  (cont'd.)
TURBINE WHEEL FOUNDRY
                                   ESTIMATED COST OF FACILITIES
Item Description & Reference
H Shipping
H-l Container Packaging Unit
H-2 Platform Scales
H-3 Lift Truck
H-4 Levelators
H-5 5-Ton Overhead Crane
Est. Cost Elec.
Unit Est. Cost Foundations & Erection Total HP or KVA

$25,000 $10,000 $ 35,000 10 H.P.
2 5,000 ea. 2,000 12,000
2 8,000 — 16,000
2 12,000 7,500 31,500
75,000 — 75,000 10 H.P.
                                                                                 $169,500
OJ

-------
           TABLE III  (cont'd.)
                                           TURBINE WHEEL FOUNDRY
                                       ESTIMATED COST OF FACILITIES
Item   Description & Reference
                                             Est. Cost      Elec.
Unit   Est. Cost    Foundations & Erection     Total      HP or KVA
I      Maintenance


1-1    Miscellaneous Equipment
         $50,000
$5,000
$55,000       250 HP
    u>
    en
                                                                                    $.55,000

-------
     TABLE  III  (cont'd.)
TURBINE WHEEL FOUNDRY
                                 ESTIMATED COST  OF  FACILITIES
Item
J
J-l
J-2
J-3
Description & Reference
Laboratories
Sand
Slurry
Metallurgical
Est. Cost Elec.
Unit Est. Cost Foundations & Erection Total HP or KVA
50 H.P.
$ 30,000 — $ 30,000
40,000 — 40.000
275,000 $10,000 ,000
                                                                               $355,000
co

-------
           TABLE III  (cont'd.)
    TURBINE WHEEL FOUNDRY
                                       ESTIMATED COST OF FACILITIES
Item   Description & Reference
Unit   Est. Cost
Foundations & Erection
Est. Cost
  Total
  Elec.
HP or KVA
K      Miscellaneous

K-l    Offices & Furniture

K-2    Cafeteria

K-3    Shop Offices
         $60,000

          25,000

          20,000
                         $60,000

                          25,000

                          20,000
                                                                                    $105,000
     U)
     CO

-------
       TABLE III (cont'd.)
TURBINE WHEEL FOUNDRY
                                   ESTIMATED COST OF FACILITIES
Item
L
L-l
L-2
L-3
Description & Reference
Building & Grounds
Building
Land
Parking, Misc. Grounds
Est. Cost
Unit Est. Cost Foundations & Erection Total

60,000 ft2 $2,104,000
10 Acres 100 ,000
100,000
Elec.
HP or KVA




                                                                      Total
                                          $2,304,000
OJ
vo

-------
TABLE III (cont'd.)
                                TURBINE WHEEL FOUNDRY
                            ESTIMATED COST OF FACILITIES
                             TO HEAT TREAT IN-738  ALLOY
Item
M
M-l
M-2
M-3
M-4
M-5
M-6
M-7
Description & Reference Unit Est. Cost
Heat Treatment Facility
Four 3-Chamber Vacuum $190,000
Batch Furnaces
Four Continuous Exothermic 150,000
Furnaces
One 5 -Ton Overhead Crane 75,000
Miscellaneous Cold Conveyor 2,500
50 ft.
Miscellaneous Hot Conveyor 10,000
100 ft.
Building 20,000 ft2
Grounds 2.0 Acres
Est. Cost Elec.
Foundations & Erection Total HP or KVA

$35,000 $ 900,000 400 KVA
35,000 440,000 350 KVA
100 H.P.
Comp. 75,000 10 H.P.
1,000 3,500 10 H.P.
2,000 12,000 10 H.P.
700,000
20,000
Sub Total $2,150,500
^, 15% Engr. & Cont. 322,575
                                                     TOTAL              $2,473,075

-------
                          TABLE IV




                      MANPOWER SUMMARY
TOTALS BY SHIFT

Alloy IN713LC
Direct Hourly
Indirect Hourly
Salary
TOTAL
Alloy IN-738
Direct Hourly
Indirect Hourly
Salary

1
25
19
ii
62

29
19
18
Shift
2_
22
16
_5
43

26
16
5

3_
5
9
_4
18

5
9
4

Total
52
44
27
123

60
44
27
                    TOTAL
66
47
18
131
                                                             41

-------
TABLE IV (cont'd.)
MANPOWER
Shifts

Pattern Making
Plastic Mold Operator
Pattern Assembly Area
Sub Total
Shell Material Prep, and Shell
Batch Slurry Operator
Refractory Reconditioning
Operator (Sand Lab)
Production Line Operator
Dip and Stucco
Inspection
Sub Total
Shell Drying Burnout & Fire
Burn Out Furnace Operator
Burn Out Furnace Laborer
Sub Total
Master Melting Operation
Furnace Crew
Mold Teardown and Assembly
Technician
Sub Total
Production Melting and Casting
Master Furnace Operator
Furnace Helpers
Sub Total
Cooling and Shakeout
Operator
Laborer
Sub Total
I

3
1
T
Building
1

1

1
1
4

1
1
2

3
1
1
5~

1
2
3

1
1
2
2_

3
1
I

0

0

1
1
2"

1
1
2

3
1
1
5~

1
2
3

1
1
2~
3_

0
0
0

0

0

0
o
o"

0
0
0

3
1
1
5"

0
0
0

0
o
o"
Total

6
2
*

1

1

2
2
6

2
2
I

9
3
3
15

2
4
6

2
2
4
                                                             42

-------
TABLE IV  (cont'd.)
                                      Shifts
                                                       Total
Finishing
     Cutoff Machine Operators
     Inspection
     Packaging
     Shipping
                    Sub Total

                    TOTAL
 2
 1
 1
 1
 5
                                  25
2
1
1
0
0
0
0
0
     22
 4
 2
 2
 1
~9
                52
Cleaning and Heat Treatment (Optional-Use with IN-738 Alloy Only)
     Helper
Maintenance
     Melting
     Production Furnace
Miscellaneous
     Met. Lab. a
     Quality Control
     Foundry Clerk
     Production Clerk
     Relief
     Truck Operators
     Nurse
     Stores
     Shipping
: Operator
Sub Total
MISCELLANEOUS
2 2
2 2
4 4
MANPOWER
2
2
4
Shifts


•nace
md Shell Room
die repair)
Sub Total
Sand Lab.
.1

irk

•s



Sub Total
:L
1
1
2
4
F
1
2
1
1
2
1
1
1
1
IT
2_
1
1
2
3
7
1
2
1
0
2
1
1
1
0
9
3_
3
3
0
2
*
1
0
0
0
0
0
0
0
0
1
                       6
                       6
                      12
                                                       Total
                       5
                       5
                       4
                       9
                      2T
                       3
                       4
                       2
                       1
                       4
                       2
                       2
                       2
                       1
                      IT
                    TOTAL
T9
                                            ~9
                                                            43

-------
TABLE IV (cont'd.)
SUPERVISION
                                      Shifts
                                                  Total
     Manager
     Production Superintendent
     General Foreman
     Metallurgist
     Chemist
     Plant Engineer
     Maintenance Superintendent
     Maintenance Foreman
     Production Foreman
     Draftsman
     Personnel/IR
     Accounting
     Secretary
     Inventory
     Security
                    Sub Total
1
1
1
1
1
1
1
1
3
1
1
1
1
1
2
TF
0
0
0
0
0
0
0
1
3
0
0
0
0
0
1
5
0
0
0
0
0
0
0
1 .
2
0
0
0
0
0
1
•3
1
1
1
1
1
1
1
3
8
1
1
1
1
1
4
2T
                    TOTAL
         18"
                                                            44

-------
Turbine Wheel Cost

The following is the summary of costs and resultant per wheel

cost:
     Alloy Cost - Ingot       = $1.89/pound
     Pattern, Shell &
     Production Melt Cost*    = $0.13/pound
                              = $2.02/pound

     Material Cost per Wheel  =  2.7 Ibs x $2.02/lh
                              = $5.45
The direct annual labor costs are as follows:



     52 men x 2080 hr./year

     x $7.50 (includes 50%

     fringe benefits)         = $811,200.00



Therefore the direct labor cost to produce 2,000,000 turbine

wheels per year is $0.41 per wheel.



The overhead for the production of the 2,000,000 wheels annually

consists of indirect labor (hourly and salary) and capital

equipment building and grounds as follows:



*Total of $0.03 Polystyrene/wax patterns, $0.05 for refractory

shell and $0.05 for melting costs  (includes power, water &

crucible refractory, etc.) in the production furnace.
                                                           45

-------
1.   Capitalization & Depreciation Schedule            Annual

     a.   Equipment (12 years)
          $10,378,750 T 12                        $  864,896.00
     b.   Building and Grounds (20 years)
          $2,649,600 T 20                         $  132,480.00

2.   Labor, Indirect

     a.   Hourly
          44 men x 2080 hr/year x 7.50            $  686,400.00
     b.   Salary
          27 men x 2080 hr/year x 7.50            $  421,200.00

3.   Miscellaneous Expenses

     a.   Shipping, packaging & supplies          $  100,000.00
     b.   Telephone, etc.                             14,400.00
     c.   Lease Equip., Professional Services, etc.   19,200.00
     d.   General Maintainence                       195,500.00
     e.   General Utilities, etc.                    208,500.00
     f.   Property Insurance, Taxes
          and Related Items                          200,000.00

                                           TOTAL  $  737,600.00

Thus the annual overhead dollar total is $2,842,576.00 (Incl.
items 1,2 & 3).  The overhead percentage is therefore
$2,842,576.00    .
   811,200.00


With a direct labor cost of $0.41 per wheel the labor cost per
wheel including overhead is $0.41+(0.41 X 3.50)=$1.85.  Adding
material to this ($5.45 + $1.85)  the final cost is $7.30.

To this cost, utilizing the original manufacturing assumptions
of 10 percent for General and Administrative costs and 25 percent
for corporate profit.

     $7.30 x 1.10 = $8.03
then $8.03 x 1.25 = $10.04

the final O.E.M. selling price per wheel is $10.04 each.
                                                            46

-------
OPTIONAL ALLOY IN-738 SUPPLEMENT

This supplement to the study was initiated to include the
cost impact of substituting alloy IN-738 for IN-713LC as
the primary casting alloy for automotive turbine wheels.

This alloy is currently reaching production status in aircraft
turbine wheels due to its characteristic improvements in
elevated temperature properties.  This alloy is a vacuum cast,
precipitation hardened, nickel base alloy, with excellent
high temperature mechanical properties coupled with hot
corrosion resistance.  A complete summary of both alloy systems
may be found in addendum #2.

The fabrication characteristics of the alloy indicate that it
would not present substantially different casting problems than
would IN-713LC.  There are two primary cost areas that would,
however, have an influence on the final price structure, these
are higher alloy constituent costs and an additional heat treat-
ment operation.

The additions to the process requirements are described as
follows:
                                                            47

-------
Optional Heat Treating (Required with IN-738 Alloy)
The heat treatment of the castings will be carried out using
current heat material procedures automated where applicable to
lower labor costs.  Any heat treatment will be carried out in
assembly and before the cutoff operation.

The precipitation treatment will be carried out in a horizon-
tal vacuum furnace with multiple chambers to be able to keep
the high temperature zone in constant operation.

The castings will be stacked in batches in an appropriate con-
figuration and loaded in the entry lock adjacent to the heating
chamber.  After the vacuum is balanced with the heating chamber,
the inner door will open and the batch charged into the heat-
ing chamber.  The batch will be precipitation hardened for
two hours at 2050°F and when the cycle is complete, moved to
the cooling chamber and cooled to approximately 1000°F.

The batch is then charged into an aging furnace (either
a batch or continuous unit) and will be aged for a minimum
of 12 hours at 1550°F.  This furnace/s is intended to be an
standard atmosphere unit, however, exothermic generator gas
can be used if oxidation would be a problem.  After the aging
cycle is complete, the batch is allowed to air cool, prefer-
ably accelerated using a cooling tunnel of forced air.

The castings are then removed from the batch racks and trans-
ferred on a soft conveyor to the cutting lines.

To accomplish the above described heat treat operation additional
manpower would be required.  The manpower relationships are
summarized on page  48.
                                                            48

-------
The alloy constituent summary and resultant raw materials costs
are shown on Table V.  These costs are represented on Table VI
for annual requirements and the per pound cost for master ingot
therefore is $2.41 per pound.  In addition using the developed
prices of the IN-713LC for shell, production melting and pattern
at an additional $0.13/lb.  The Raw material cost is $2.54 per
pound or $6.86 per wheel.
The annual overhead for this supplement develops as follows:

1.   Annual Depreciation-Equipment      $  971,752.00
2.   Annual Depreciation-                  173,.850.00
3.   Indirect Labor                        686,400.00
4.   Misc. Expense  *                      737,600.00
5.   Salary                                421,300.00

                                        $2,990,902.00

The direct labor annual cost is $936,000.00.  Thus the
overhead rate develops at  319.5%.
*  See Misc. Expense Page 46

The above figures reflect the total dollar outlay per annum to
produce 2,000,000 turbine wheels in IN738.

The direct labor cost therefore is:

     $936,000.00 T 2,000,000 wheels or $ .468 per wheel.
                                                            49

-------
The direct labor plus overhead rate therefore is projected
as:

     .486 + (.468 X 3.195)= $1,98 per wheel or
     a labor material ratio of approximately 3:1

Therefore using the previous G&A figure of 10%, and profit
of 25% the selling price per wheel develops as:

     Material       $6.86
     Labor           1.98
             Total  $8.84

     Plus G&A       $8.84 x 1.10 = $9.72
     Plus Profit    $9.72 x 1.25 = $12.15

The O.E.M. selling price for IN-738 turbine wheels is therefore
$12.15 each.
                                                            50

-------
                                              TABLE V

                               MASTER HEAT-VIRGIN  MATERIAL  COST-IN738
Element
C
Cr
Mo
Al
Ti
Zr
W
B
Co
Ta
Cb
Mn
S
Ni
Price Per Lb.
.15
16.00
1.75
3.40
3.40
0.10
2.60
0.10
0.85
1.75
8.50
0.20
.01
62.20
$4189.52
2020 Lb.
Form
Powder
Electronic
Pellet
Pig
Sponge /Scrap
Ni/Zr (70%)
Pellet
Ni/B (18%B)
Electrolytic
Sheet/Scrap
Ni/Cb (50%)
Pellet/Scrap
-
Electrolytic
or Carbonyl
Pellet
— C*5 fi "7 A T V\
— y Z , U / *4 JjD »
Cost/Lb./$
.50
1.15
3.70
0.28
1.37
3.52
5.85
3.25
2.35
10.50
6.51
4.00
-
1.53
Wt . /Ton/Lb .
3.0
320.0
35.0
68.0
68.0
2.0
52.0
2.0
17.0
35.0
170.0*
4.0
-
1131.0**
(113) **
2020.0
Cost/Ton/$
1.50
368.00
129.50
19.04
93.16
7.04
304.20
6.50
39.95
367.50
1106-70
16.00
-
1730.43**
4189.52
01   *Yields 170 Ibs. of Cb @ 60% Cb/40% Ni.  Ni weight transferred  to Ni  requirement at no cost.
I--

    **Includes 113  Ibs. of transferred Nickel  from  Cb/Ni alloy.

-------
Required Wgt.
                                                 TABLE VI

                                  ANNUAL INGOT PRODUCTION-COST SUMMARY

                                              ALLOY IN-738
Description
Required Del.
Product
Revert Metal
Total Metal
Loss
Virgin Metal
Wgt/Annual/lbs .
5,400
1,890
727
6,127
,000
,000
,000
,000
Melt Cost/lb.
$0.03
0.08*
0*03
•0.03
Metal Cost/lb.
$2
.07
Transfer
2
2
.08
.07
Annual
$11,340
151
1,526
12,866
Cost
,000.
,200.
,700.
,700.
Total
00
00
00
00

       ANNUAL INGOT COST-POUND-IN-738

5,400,000
2.41**
$13,017,900.00
*    Includes Reprocessing Cost + Melting Cost.
**   Includes Average Cost for Delivered product, Revert Metal and Total Melt Loss Replacement
 tn

-------
                      ACKNOWLEDGMENTS
Williams Research Corporation wishes to acknowledge the following
contributing firms who provided us with realistic pricing and
technical assistance in their respective areas of the proposed
manufacturing process.
     Foundry Magazine
     Penton Plaza
     Cleveland, Ohio  44114

     I. E. Dupont DeNemours & Company
     Technical Services Laboratory
     Chestnut Run
     Wilmington, Delaware  19898

     Inductotherm Corporation
     10 Indel Avenue
     Rancocas, New Jersey  08073

     International Nickel Company, Inc.
     67 Wall Street
     New York, New York  10005

     Lindberg
     Division Sola Basic Industries
     2450 W. Hubbard Street
     Chicago, Illinois  60612

     Technology Associates, Inc.
     850 Providence Highway
     Dedham, Massachusetts  02026
                                                            53

-------
         ADDENDUM 1
AUTOMATED INVESTMENT CASTING
        IN THE USSR
      FOUNDRY MAGAZINE




        August 1972
                                              54

-------
                    Automated
Investment  Casting
                  in  the  USSR
                                                     FOREIGN FOUNDRIES	a series
                    Soviet development of automated investment
                  casting is highly advanced. In one automotive
                  investment foundry, 80% of all operations are
                  automated, including pattern material preparation,
                  slurry preparation, patternmaking, ceramic mold-
                  making, dewaxing, firing of shells, embedding the
                  shells in backup sand, pouring, cooling, cleaning,
                  and cutoff. As a result of automation like this,
                  up to 1,000 investment cast parts are used in
                  automotive applications.
• THE SCOPE of application of in-
vestment casting  in the USSR  is
wide,   particularly  in  producing
parts for automobiles, tractors, air-
planes, sewing machines, bicycles,
and motorcycles. In the automobile
industry alone,  as many as  1,000
types  of castings  are produced by
investment  casting, many  having
been switched from drop forging,
stamping, or welding.
  In 1967,  the  Gorky Automobile
works  established an  automated
investment  casting foundry incor-
porating two production lines. See
Fig. 1. Each line can produce 500,-
000 molds per year in a two-shift
operation—or about  2,500  metric
tons of castings annually per  line.
Typical  castings  produced  are
shown in Fig. 2.
  Eighty percent  of all operations
are automated. Through use of new
technology,  plus  automation, the
moldmaking - casting  production
cycle  has been reduced from 60-70
hr to 24 hr.
  Pattern  Materials — To   reduce
pattern shrinkage, pattern material
is melted and saturated with air to
convert it  into an  easy-flowing,
compressible paste.  The   micro-
sized  air bubbles forced into the
melted material and later injected
into a  die cavity offset the natural
shrinkage  of  the  material.  The
process is applicable to any formu-
lation  with  dripping point  up  to
80C (176F).
  Pattern material melted out  of
molds with hot water is separated
easily from the water, due to its
different  specific  gravity,  and
pumped to  the melting unit. It is
heated  with hot  water circulating
through piping  in its walls  and
bottom. Return  pattern  material
enters  a first compartment  where
any  remaining   water and con-
taminants settle out. Clean pattern
material passes over into a second
compartment where it is stirred to
prevent separation of  constituents
and  to mix in  fresh ingredients.
Makeup material is  melted in  a
steam-heated tank and filtered be-
fore it is added.
  From the melting  unit, molten
pattern material is pumped through
a heated pipeline to storage  tanks.
Pumping is controlled  automatical-
ly to maintain material at  preset
levels.  In  the  storage tanks, the
pattern material  is cooled  to the
required temperature  and flows by
gravity through a heated pipe into
the paste preparation  unit.
  There the required  amount of
air  is  mixed  into   the pattern
material prior to delivery by pneu-
matic pumps through  heated pipe-
lines  to  the patternmaking  ma-
chines. Temperature  is controlled
to within  1  degree C  (less  than 2
degrees F).
  As shown in Fig. 1, four prepara-
tion units serve eight patternmaking
machines. The preparation, heating,
and pumping units are serviced by
a single operator who prepares the
equipment  for operation, controls
the machinery, and monitors proc-
ess parameters.
  Automated Patternmaking — Ro-
tary 10-station machines  (Fig. 3)
produce   patterns  automatically
          SOVIETS TO
      LICENSE TECHNOLOGY
   The Soviets believe their technology
 for investment casting is advanced, and
 they are willing to work with American
 firms to  establish  similar  investment
 casting production facilities in the U. S.
 Technology Associates Inc., Dedham,
 Mass., a technology transfer consulting
 firm, is handling the project in the U. S.

with injection cycles of 10, 15, or
20 sec,  depending  on  pattern di-
mensions and the required  cooling
time. The injection die is filled
under pressure at  Station  1.  The
die then is advanced to Stations 2
through 7 to cool the pattern. At
Station 8, the die  opens  and the
pattern is pushed out into a water
conveyor, which also serves to cool
the  material  further.
  At Station 9, the die cavity  is
cleaned and  lubricated,  and at 10
it is closed.  All operations are in-
terlocked, and the drive is stopped
automatically if a malfunction oc-
curs. The dies are cooled with cold
water circulated through channels
in both halves of the dies.
  Patterns  are  produced  in  a
cluster around a central hub. When
the   clusters  are  assembled   into
pattern  trees, the  hubs  make up
the  pattern for the central  runner,
as shown in Fig. 4. Adoption of
standard  elements  in the running
system provides for easy change-
over from one type of  casting to
another. Up to 10 different patterns
can be produced simultaneously.
  Each   injection   machine    is
manned by an operator. The opera-
tor cleans and lubricates the injec-

                             55

-------
lion molds as needed.
  Size of  the  automatic injection
die is 240 x 240 mm (9.4 x 9.4 in.).
Usable pattern  cluster diameter is
about 220  mm  (about 8.5 in.). The
closing stroke is 170 mm (6.7 in.).
Cycle time depends on the size of
the casting,  with 10 sec typically
used  for castings weighing up  to
70 g  (2.5 oz) and  15  sec for cast-
ings  weighing  more  than  70  g.
Thus output per machine is 360
clusters  per hour  for the  10-sec
cycle;  240  for  the  15-sec  cycle.
Time required for readjustment  to
a new type pattern is  25-30 min.
  As noted,  the pattern cluster is
discharged into  a water conveyor,
which  carries it to the  assembly
area. A  pouring basin  pattern  first
is  put on  a holder attached to a
conveyor  chain. Then  the  several
clusters are added  with the aid  of
a holding jig. The assembled set is
locked on  the holder with a metal
cap  that  is coated  with  pattern
composition.  Two  workers   as-
semble patterns in a temperature-
controlled room.
  Slurry Production — Preparation
of the slurry, under supervision  of
one  operator,   begins  with  the
automatic  metering and mixing  of
Fig. I—Two automated investment casting lines are operating at the Gorky
Automobile Works. The first production line, bottom of layout, was placed in
a former machine shop. Second line was installed later.
Fig. 2—Typical Soviet investment castings. Rocker arm casting, lower left, is about
Sin. long.
                                                                 56

-------
Fig.  3-Rotary  10-
station machine pro-
duces patterns auto-
matically.  When
necessary, all 10 dies
can be different. Die
changing  time  is
about V} hr.
Fig. 4-Standardized
pattern  assembly
shows the riser (1),
basin  (2),  pattern
clusters  on  central
hubs  (3). and the
metal cap that locks
the assembly on the
holder (4).
L
                                            - 350 MM-H3.H m-l -

                                            - —	488 MM H9.2 in.) -
                          -   I

 Fig. 5-Main sections of the automatic
 system for making shell molds are the
  automatic coating and sprinkling ma-
chine (1), drying chamber (2), bath for
  melting out pattern material (3), and
        the conveyor (4) that ties the
                   system together.
   ethyl  silicate and acidulated water
   in a  small  tank.  From  there  the
   hydrolyzed  silicate  is  dispensed
   into the main mixing tank. Quartz
   powder is fed into this tank by an
   automatic  weighing  feeder   belt.
   The ingredients are mixed vigor-
   ously,  and  finished  slurry  is  de-
   livered  continuously through  an
   overflow pipe at the  rate of 180 kg
   (400 Ib) per hour. The system also
   permits  batch   operation  when
   needed.  Prepared slurry  is   dis-
   pensed  into  storage tanks,  then
delivered  to the dip-coating baths,
where the proper level  is main-
tained automatically.
  Shell Molding—Slurry in the dip-
coating bath is stirred continuously
to prevent settling of solid mate-
rials.
  Assembled   pattern  trees  are
delivered  by  conveyor to the first
dip-coating  and  stuccoing   unit
(Fig.  5).  After the assembly has
been  dipped  into the  slurry,  it
passes under a curtain of sand and
into  a drying  chamber where the
slurry-stucco  coating  is  dried in
air and in an ammonia atmosphere.
Evaporation of ammonia  from the
ceramic   coating  is  done  in  a
separate   section  of  the  drying
chamber.  The  pattern  trees then
are delivered to a second dip-coat-
ing unit.
  Spill  sand  from  the  stuccoing
operation is  returned  by elevator
to the overhead  chute  for  further
use. Sand is replenished by a pneu-
matic  conveyor.  The process  just
described is  repeated  four times
in the system  diagrammed  in  Fig.
5. Dipping and stuccoing  units are
maintained by  one operator.
  Completed shell molds are loaded
onto fixtures  hung from  a  mono-
rail chain conveyor that carries the
molds  through  a hot-water bath
for pattern removal.  As  the de-
waxed molds  leave this operation,
a worker removes them  from the
conveyor, inspects them, and sorts
them  according to grade of steel
to be poured. One operator controls
the chain conveyor, drying  cham-
bers, and  dewaxing baths.
  The  entire  moldmaking  area is
air  conditioned  to  maintain re-
quired temperature  and humidity.
Automation  of  the  shell-making
operation has  eliminated  manual
labor  at  the dip-coating and stuc-
coing areas in the atmosphere of
acetone  and  the silicate  vapors
with suspended quartz powder.
  Firing   and   Pouring—The  shell
molds  are mounted  on  conveyor
hangers,  as shown in  Fig.  6, with
each hanger  accepting  two  small-
diameter molds or a single mold of
larger diameter. The pouring basin
is covered with a removable cap to
keep sand from entering  the mold
and to fix the  mold to the hanger.
                                                                                                          57

-------
Fig. 6-Shell molds are placed on a hanger (1) before entering the gas-fired furnace
(2). As molds exit the furnace, they are lowered by a pneumatic hoist (3) into
a bed of sand heated by manifolds (41.  They move with the rotary bed (5) to the
pouring station and then to the unloading station, where a pneumatic hoist
(6) lifts them out of the sand. Molds then pass through a cooling chamber (7). A
belt conveyor (8) catches spill refractory, and a trolley conveyor (9) moves
molds through the system.
  The mold passes into the furnace
for firing at 900 C (about 1.650F).
The hanger follows a slit in the
roof of the furnace so that the con-
veyor  chain,  hanger  carrier,  and
track are outside the hot zone. Ex-
haust ventilation is provided along
the entire slit in the roof.
  On leaving  the oven,  the  fired
shells are  immersed in a bed of
sand, fluidized by  hot air, at the
rotary pouring machine. The chain
conveyor drives the trough in syn-
chronization through a sprocket.
  Shells  leave the  fluidized  zone
firmly embedded in  the backup
sand. They enter a 6-m (20  ft)
pouring  zone that  takes up  half
the circumference of the turntable.
Molds are poured from shank ladles
of 80-kg capacity (about 175  Ib).
Steel melts are prepared  in 160-kg
(about 350-lb) induction furnaces.
  The turntable continues its rota-
tion, and the poured molds cool to
about 1,200 C  (about 2,200 F), after
which they are lifted out by an air
hoist.  They  then  are  moved by
chain conveyor to a  water-spray
cooling chamber.  On  leaving  the
cooling chamber, the poured molds
are  removed  from the conveyor
hangers, and the latter are returned
to the shell assembly station.
  Shakeout, Cutoff—Poured  shells
are placed manually  on a shuttle
conveyor for  movement to  a vibra-
tor that shakes shell material from
the sprue of  castings. The shuttle
carries the sprue of castings  to  a
cutoff  unit  that  consists  of an
annular cutting die mounted  in  a
press. Castings fall to a container
or a belt conveyor, and the riser  is
ejected. The  press  stroke  may be
pulsating  to   improve  the cutoff
action.
  That  approach   to  cutoff  was
made possible through adoption of
a  feeding system of  standard di-
mensions. Yield was  sacrificed in
some instances for  the   sake  of
automating the cutoff operation.
  Final  Cleaning — Complete  re-
moval  of ceramic from the castings
is  achieved  by  an alkaline  bath
and  hot-water  rinse  in  a  two-
compartment, rotating barrel at the
rate  of 450 kg  (about 990 Ib)  of
castings per hour. A vibrating  feed-
er delivers  the  castings  to  the
barrel,  and  cycling  through  the
baths  is  automatic.  Cleaned and
washed castings are  delivered  to
furnaces for normalizing treatment
under  a  protective atmosphere  to
prevent  scaling  and  decarburiza-
tion.
  Following   normalization,   the
steel castings have a  fine-grained,
homogeneous structure of pearlite
and ferrite. The decarburized  zone
is .3 to .35 mm (.12 to .14 in.) deep.
  Process Control—Control of the
entire  system  is from  a  central
office.   Control  consists  of  the
following functions:
  • Remote automatic registration
of the number  of  pattern  assem-
blies   and shells  made  (usable,
rejected, fired) and of cutoff  cast-
ing assemblies.
  • Remote automatic registration
of shells in storage.
  • Remote  semiautomatic  regis-
tration of the number of castings
by type sent to storage and de-
livered from  storage  as finished
products.
  • Automatic  recording  of  all
data on report form by  automatic
electric typewriter.
  • Remote  automatic   transmis-
sion of all report data to  the plant's
computer center for preparing and
issuing to the shop detailed sched-
ules  for  starting  up,  production
output, and for processing  reports
on fulfilment of the shop plan.
  • Signaling the  operating  con-
dition  of basic equipment.
  • Automatic  selective registra-
tion of operating and downtime of
basic equipment.
  • Remote  automatic monitoring
of availability of basic materials.
  • Telephone  control   intercom
within shop.
  • Radio communication  within
shop for production purposes.
  • Transmission of rapid chemi-
cal analyses  of metal  from  labora-
tory to steel-melting department.
                                                                                                        58

-------
     ADDENDUM 2
  ALLOY SUMMARIES






    713LC/IN-738
INTERNATIONAL NICKEL
                                             59

-------
                                                                    preliminary data
                      ALLOY   713LC
                      LOW CARBON ALLOY  713C
The low carbon modification  of alloy 713C* was developed  by  C. G. Bieber at the Bayonne Research
Laboratory of The International Nickel Company, Inc. to combine the good stress .rupture properties of
the base material with excellent room temperature ductility and strength.  The combination of these
properties becomes highly desirable in such applications as the integrally cast wheel.  The highly
stressed, heavy hub section of the wheel remains at a relatively low temperature while the thin leading
and trailing edges of the blades must withstand cyclic temperatures up to 1800 F, depending upon the
engine.  Recent evidence has shown that alloy 713LC produced with a low iron content, i.e. less than
.50%, has superior mechanical properties to heats containing high iron, i.e. greater than 1.20%. Data
presented here will cover material manufactured to the recommended composition listed below as well
as alloy containing high iron as originally produced.


Composition — weight per cent
       The nominal composition  and recommended range to which the alloy is produced are shown in
       the tabulation below:
                 Element                     Nominal              Range
                Carbon                        0.05           0.03 - 0.07
                Chromium                     12.00 .         11.00 - 13.00
                Molybdenum                    4.50           3.80 - 5.20
                Columbium + Tantalum           2.00           1.50 - 2.50
                Aluminum                      5.90           5.50 - 6.50
                Titanium                      0.60           0.40 - 1.00
                Boron                         0.01           0.005 - 0.015
                Zirconium                     0.10           0.05 - -.15
                Silicon                      LAPt            0.50 max.
                Manganese                   LAP             0.25 max.
                Iron                         LAP             0.50 max.
                Copper                      LAP             0.50 max.
                Sulfur                       LAP             0.015 max.
                Nickel                      Balance          Balance

Effect of Corbon Content

Figure 1 illustrates the effect of carbon content on the room temperature tensile properties, while
Figure 2 shows its relationship to stress rupture properties.  The data presented include results from
both laboratory and  commercial melts.  The apparent increase in stress rupture properties at "zero"
carbon over the values at 0.02% carbon does not reflect the true variation with carbon content, but
rather represents all laboratory heats produced with NiCb versus all the commercial melts produced
with FeCb.
       * U.S. Patent »2,570,193, produced under license from The International Nickel Company, Inc.
       t Low as possible
                                                                                            60

-------
CO
    150
    140
    130
CO
Q.

O
O
O

~  120
CO
CO

£   no
    100
     90
     80
                          TENSILE STRENGTH
                    2 % YIELD STRENGTH
             I
                            I
I
I
            .02   .04  .06   .08   .10   .12   .14

                CARBON  CONTENT %
                                                     CD
                                                     Z
                                                     O
                                                         30
                                                         20
                                                          10
                                                            0    .02  .04  .06   .08   .10

                                                                     CARBON  CONTENT   %
                                                        .12   .14
co
ce
o
o


LiJ
       Figure 1.   Room Temperature Tensile Properties vs. Carbon Content of As Cast, Vacuum Melted,

       Vacuum Cast Alloy 713LC.
             •— I700F/30.000  PSI

             O---I800 F/22,000  PSI
           .02  .04  .06  .08   .10   .12   .14

               CARBON CONTENT %
                                                          15
                                                          0
                                                                 •	1700 F/30,000 PSI

                                                                 O-	1800F/22,000 PSI
                                                                                           I
                                                            0   .02  .04  .06  .08   .10  '  .12

                                                                     CARBON CONTENT %
        Figure 2.  Stress Rupture Properties vs. Carbon Content ol As Cast, Vacuum Melted, Vacuum

        Cast Alloy 713LC.
                                                             .14
                                                                                               61

-------
Physicol  Properties  - Low Fe Moteriol

       Density
             .289 Ibs/cu in  (8.01 g/cu cm)


       Melting Range (estimated)
             2350-2410 F
       Oxidation Resistance (See Figure 3)
             Samples were given cyclic exposure by heating in air to 1900 F for 16 hours and cooling
             for 8 hours.
Time, hrs.

    16
    32
    48
    64
    80
    96
   112
                                  Wt. Change, %
                              713LC        IN-100
                                0.17
                                0.23
                                0.29
                                0.15
                                0.04
                                0.05
                                0.0
.02
.07
.14
.24
.24
.28
.38
Time, hrs.

   128
   144
   160
   176
   192
   208
   Wt. Change, %
713LC       IN-100

-0.14        -.44
- 0.07        - .48
-0.08

-0.08
- .62

- .82
            58
            UJ
            z
            
-------
Mechanical Properties - Low Fe  Material « .50%)

        Tensile  Properties - Cast to Size Bars (See Figure 4)
             Test
             Temp.
               F

                70
             1200
             1500
             1700
0.2% Yield
 Strength
    psi

  109,000
  113,900
   99,000
   66,900
Tensile
Strength
  psi

130,000
157,000
123,000
 94,200
Elong.
Reduction
 of Area
    %

   20.9
   11.0
   17.0
   12.0
        Tensile Properties — Machined from hub of wheel
             Test
             Temp.
               F

               70
               70*
0.2% Yield
 Strength
   96,200
  121,400
Tensile
Strength
101,000
140,500
Elong.
 17.0
 10.5
Reduction
  of Area
   20.0
   17.5
       •Solution Treated 2150 F - 2 hrs. - AC
        Stress Rupture Properties - Cast to Size Bars (See Figure 5 and 6)


                                             Life          Elong.
                                             hrs.             %
Test
Temp.
F
1350
1400
1500
1500
1500
1700
1700
1800
1800

Stress
psi
90,000
85,000
60,000
40,000
40,000
30,000
20,000
22,000
15,000
                                            201.0
                                             81.7
                                            131.5
                                           3023.1
                                           3500
                                             66.6
                                           1686.2
                                             62.1
                                            930.0
             •Test stopped after 3500 hours. Bar had 3.6% creep.
              on the bar indicated the following:
             Test
             Temp.
               F

               70
0.2% Yield
 Strength
    psi

  88,500
Tensile
Strength
  psi

110,800
                                   4.0
                                   3.1
                                  10.7
                                  10.7
                                  (3.6)*
                                   8.5
                                   5.5
                                   7.2
                                   7.6
                                 No. of
                                 Tests

                                   2
                                   2
                                   1
                                   1
                                   1
                                  10
                                   1
                                  66
                                   2
                                 Room temperature tensile test
Elong.
 10.0
Reduction
 of Area
   %

   17.5
Effect of Iron Content on Stress Rupture Properties

Increasing iron decreases the high temperature strength of this alloy by lowering the solutioning tem-
perature of the gamma prime phase Nig (Al, Ti). It has been shown that the elevated temperature
stress rupture strength of alloy 713C and a similar alloy is adversely affected by the addition of iron
to master heats made with pure columbium. The following data indicate the effect of iron on several
laboratory melts  of alloy 713LC produced with the  columbium addition being made in the form of
ferrocolumbium in one case and nickel columbium in the other.
                                                                                                    63

-------
Test Conditions:  1800 F - 22,000 psi
                                          NiCb

                                    (approx.  .15% Fe)
      FeCb

(approx. 1.50% Fe)
No. of Melts 12 7
Average Life, hrs. 65.7 42.8
Range of Life, hrs. 37.3 - 101.9 29.4 - 64.2
Average Elong. % 8.2 6.8
Range of Elong. % 4.2 - 10.6 3.5 - 10.6
160
L75 140
a.
O
o
0
co~ 120
CO
UJ
tr
i-
co
I(J(J


80

cr\






















— *•«
















^^MM











































































TENSILE STRENGTH ^y











^^"•B







M^^M



—^

0.2% YIELD I ST





• -





•— •»
ELONG. -"*
,





""• •*•
^^MM

/
/


RENG1



s
f




H^x



~N





^-~




\




^



RED AREA
-..,
-


i^ita


- —

k' —
*~^





\
s


\




*x








\
\

\
\
>
•"^











\
\

y
\
C\
^






















~2f\ 3®

z
o
f.\J (—
1
10 |
0 u
         0      200    400     600    800     1000    1200    1400    1600    1800


                                     TEMPERATURE,F


Figure 4.   Typical Tens/'/e Properties o/ /Is Cast, Vacuum Melted, Vacuum Cast Alloy 713LC.

(Low Fe Material)
 CO
 o.

 o
 o
 o


 CO
 CO
 UI
 o:
 t—
 CO
                                                 500    1000
         5POO  10,000
                                            TIME.HOURS

Figure 5.   Stress Rupture Data On As Casr, Vacuum Melted, Vacuum Casr Alloy 713LC.

(Low Fe Material)
                             64

-------
Mechanical Properties - High Fe Material (Approx. 1.50%)

        Tensile Properties - Cast to Size Bars (See  Figure 7)
             Test
             Temp.
               F

               70
             1000
             1200
             1350
             1500
             1700
0.2% Yield
 Strength
    psi

 109,400
 108,400
 109,900
 111,100
  87,200
  55,700
Tensile
Strength
  psi

133,100
132,200
138,100
145,300
124,500
 88,400
       Tensile Properties — Machined from hub of wheel
             Test
             Temp.
               F

               70
               70*
             1350
0.2% Yield
 Strength
    psi

  89,200
 101,600
  92,600
Tensile
Strength
  psi

 94,300
112,800
108,100
Elong.
  %

 13.2
  8.0
  6.0
  8.0
 12.0
  9.0
Elong.
_%	
 16.0
 18.2
 11
       •Solution Treated 2150 F - 2 hrs. - AC

       Stress Rupture Properties - Cost to Size Bars (See Figure 6)
Test
Temp.
F
1350
1500
1700
1800

Stress
psi
90,000
60,000
30,000
22,000
                                               Life
                                               hrs.
                                               64.6
                                               68.0
                                               57.8
                                               42.8
                                  Elong.
                                    %
                                    4.0
                                    5.3
                                    4.0
                                    6.8
Reduction
 of Area
    %

   20.5
   19.5
   14.5
   21.0
   17.0
   13.5
                              Reduction
                               of Area
                                 11.0
                                 14.3
                                  5.5
                                 13.3
                                        TEMPERATURE, F
IUU
eo
60
40
£
20

£
S 10
B
6
4
^












AUO





>


f 7IJ





^x.
s

LCIH






^N
X
Ft)







xV
--«*







i — /
\N







LLOK
A







71 J

\






CILO








KFll















                            34    38    4Z    46
                                                 SO
                                               tlxlO
                                                  "3
       Figure 6.   Larson Miller Stress Rupture Parameter Curve For Alloy 713LC.
                                                                                                65

-------
           0      200     400     600     800     1000     1200    1400     1600     1800

                                                      TEMPERATURE,F

 Figure 7.   Typical Tensile Properties ol As Cast Vacuum Melted Vacuum Cast Alloy 713LC.
*(High Fe Material)
 Dynamic Modulus of Elasticity (See Figure 8)
      Test
      Temp.
        F

         70
        200
        400
        600
        800
Dynamic
Modulus
28.55 x
28.10
27.31
26.59
25.84
      106
Test
Temp.
  F

1000
1200
1400
1600
1800
                                               Dynamic
                                               Modulus
24.97 x 10
24.00
23.09
21.61
19.72
 Fatigue Data

 Reversed stress axial fatigue tests on machined bars in the as cast condition indicated the
                              Q
 following endurance limits at 10  cycles:
      Test
      Temp.
         F

       1200
       1500
  Grain
  Size
                     12,500
                     11,500
                                          Endurance Limit, psi
                                      (108 Cycles, A =00 , Kt = 1.0)

                                                 26,000
                                                 25,000
 As with the standard alloy 713C, the low carbon version exhibited a cleavage type of fracture
 at 1200  F.

 Effect of Casting Temperature
 Castings of alloy 713LC are normally poured at temperatures of approximately 3000 F to ensure
 soundness, fill and optimum mechanical properties.  The lower carbon content of this material
 requires closer control of casting temperatures due to its marked influence on properties as
 indicated by  the following data:
                                                                                              66

-------
Effect of Casting Temperature - High Fe Material (Approx. 1.50%)

       Room Temperature Tensile Data
              Casting
              Temp.
               F
          0.2% Yield
           Strength
             psi	
                 Tensile
                 Strength
                  psi
                Elong.
               Reduction
                 of Area
                               Condition: 1900 F Mold, Non-inoculated
              P* 4 200
              P  4 590
           104,200
           110,500
                 126,800
                 121,600
                 8.5
                15.3
                  11.2
                  18.2
                              Condition:  1650 F Mold, Non-inoculated
              P  4 200
              P  4 500
           107,200
           105,700
                 133,800
                 127,500
                12.8
                17.2
                  18.1
                  23.2
                              Condition:  1600 F Mold, Non-inoculated
              P
              P
4 250
4550
117,000
108,300
138,000
130,800
 9.0
16.0
12.0
24.0
                              Condition:  1400 F Mold, Non-inoculated
              P  4 350
              P  4550

    *P = Plateau  = Liquidus

       Stress Rupture Data
           114,500
           108,300
                 130,000
                 130,800
                7.0
               16.0
                  8.8
                 24.0
              Casting
              Temp. F
              P
              P
              P
4250
4350
4550
                      1700 F/30,000 psi
                       Hrs.   Elong.















id




S
N














s

<
















\








•



/

\
^x








50..
56.
35.





»
\
^

/





3
8
B






k.
S,
V















\
\





2.
4
6.









[\
'^ J
y
,



7
0
7










\
\\
\


















































                            0  200 400 (00 800 1000 1200 1400 1600 1600

                                         TEMPERATURE,f
                                        1800 F/22,000 psi
                                        Hrs.    Elong.
                                        17.2
                                        32.3
                                        42.8
                                2.7
                                4.0
                                6.8
Figure 8.  Dynamic Modulus of Elasticity of As Cast, Vacuum Melted, Vacuum Cast Alloy
          713C & Alloy 713LC.  (High Fe)
                                                                                               67

-------
                               IN-738
                      Preliminary  Data
INTRODUCTION
IN-738* is a vacuum cast,  precipitation hardened,  nickel-base alloy possessing ex-
cellent  high temperature creep-rupture strength combined with hot  corrosion  resist-
ance superior to that of many present day high strength superalloys of lower  chrom-
ium content. It  is designed to provide the  turbine  industry  with an alloy which will
have good creep strength up to 1700-1800F combined with  ability to withstand long
time exposure  to  the  hot corrosive environments  associated  with the engine.

IN-738  exhibits  tensile properties superior to and elevated temperature stress-rupture
properties comparable to those of the widely used alloy 713C, along with substantial-
ly better sulfidation resistance.

Three  2500  Ib.  semi-commercial heats of IN-738  have been melted to date. Data
reported herein  were obtained with material from those heats.


COMPOSITION  -  Weight Per Cent
Element
Carbon
Cobalt
Chromium
Molybdenum
Tungsten
Tantalum
Columbium
Aluminum
Titanium
Aluminum + Titanium
Boron
Zirconium
Iron
Manganese
Silicon
Sulfur
Nickel
Nominal
0.17
8.50
16.00
1.75
2.60
1.75
.90
3.40
3.40
6.80
.01
.10
LAP**
LAP
LAP
LAP
Balance (60)
Range
0.15
8.00
15.70
1.50
2.40
1.50
.60
3.20
3.20
6.50
.005
.05
.50 max.
.20 max.
.30 max.
.015 max.
Balance
0.20
9.00
16.30
2.00
2.80
2.00
1.10
3.70
3.70
7.20
.015
.15





   Low as possible
 HEAT TREATMENT
 This alloy achieves the best combination of mechanical properties after the following
 heat treatment:  2050F/2 hr/AC +  1550F/24  hr/AC.  All properties in this bulletin
 were obtained with  material given this  treatment.
  Patent pending.
                                                                                       68

-------
MINIMUM MECHANICAL PROPERTIES
No property specification has yet been written for IN-738; however, based on material
produced to date, the alloy appears capable  of at least meeting the  stress rupture
property levels usually specified for alloy 713C. The  tensile properties  appear to
offer a significant advantage over alloy 713C.
PHYSICAL PROPERTIES
 DENSITY
-  0.293 lb/in.3  (8.11 g/cm3)
 MELTING RANGE  -  2250 - 2400F  (1232-1315C)
 STABILITY   - While long time elevated temperature stability can be demonstrated
 only  by  long  time  exposure, a mathematical analysis  based on electron vacancy
 concentration (see Appendix I) is useful in indicating the  susceptibility  of an alloy
 to form sigma. The electron vacancy number, Nv, of IN-738  is 2.28. To ensure stabil-
 ity in this  alloy, it  is  recommended  that  the  Nv should not  exceed 2.36. In the
 material  produced to date, no deleterious  intermetallic phase  precipitation has been
 observed in heat treated material even after 4,000 hr.  exposure at 1500F  under a
 stress of 40,000  psi.
THERMAL EXPANSION (See Figure 1)





Temperature
(F)
70
200
400
600
800
1000
1200
1400
1600
1800
Thermal Expansion Data for
IN- 738, Heat Treated
2050F/2 hrs/AC + 1550F/2 hrs/AC
Mean Coefficient
of Expansion
from 70 F to
Indicated Temp.

6.45 x 10-6/°F
6.75
7.15
7.55
7.75
8.05
8.25
8.55
8.85
Instantaneous
Coefficient
of Expansion
at Temperature
6.2 x 10-6/°F
6.7
7.4
8.0
8.65
9.01
9.1
10.15
10.75
11.6
                                                                                        69

-------
      11.0
 X    I0'°
 UJ
 K  S- 9-0
 UJ ,)S
      8.0
       7.0
      6.0
 U.  X
 O
 UJ
 O
 LU
 O
                                INSTANTANEOUS
                                COEFFICIENT (e&
                                TEMPERATURE-
*MEAN  LINEAR
 COEFFICIENT
 (from 70 F to
 indicated temperature)
                    400         800         1200
                                TEMPERATURE,  F
                   Figure 1.  Thermal Expansivity of IN-738.
        1600
2000
CHEMICAL  PROPERTIES
A. OXIDATION
   1. Static Test - 1000 hi., still air
                                            Weight Change
Alloy
713C
IN - 738
Udimet 500 (cast)
Udimet 700
1800F
+ 0.6 mg/cm2
-16
-22
- 8
2000F
+ 29 mg/cm2
-102
-328
   2. Cyclic Test — Samples were given a cyclic exposure by heating in air at 1800F
      for 22 hr. and then cooling to RT for 2 hr.
Alloy
713C
IN-738
Wt. Loss in 1000 Hr.
0.7 mg/cm2
14 mg/cm
B. SULFIDATION

   IN-738 has been evaluated in crucible, rig and engine tests in comparison with a
   number of other alloys. The crucible  tests generally consisted of immersion of
   1/4" x 1/4"  x 1"  rectangular samples in  a molten mixture of salts followed by
   descaling operations to determine sample  weight loss.  The rig tests  were per-
 .  formed  generally  by rotating samples of pin-shapes  or airfoil  shapes  in a com-
   bustion stream of fuel containing sulfur.  Intermittent cooling cycles were employed
   to simulate engine operation. During the heating portion of the cycle, salts and/or
   alkaline metal particles were injected into the stream as  detailed in  the following
   tabulation.
                                                                                           70

-------
The test results obtained are shown below:

1. Crucible Test, 10% NaCl/90% Na2S04 - 1700F
Alloy
Alloy 713C
Udimet 500 (cast)
IN - 738
Time, Hr.
2-4
40-100
250 - 300
Remarks
Destroyed
Gross Attack
Slight Attack
2. Crucible Test (controlled replacement of salt) -1650F -300 Hr.
Alloy
Udimet 500 (cast)
.IN -738
10% NaCI/90% Na2S04
Wt. Loss, mg/cm
6
7
25%NaCI/75%Na2S04
Wt. Loss, mg/cm
16
14
3. 1000 Hr. Cyclic Rig Test - 1600F -  Diesel  Fuel (1% Sulfur) Air/Fuel Ratio:
   30/1, 5 ppm sea salt
Alloy
IN -738
Alloy 713C
Udimet 500 (wrought)
Surface Loss, mg
3.3
38 - 130+ **
1.7- 3.8
Max. Penetration, mil.
19
60 - 130+ **
12- 13
4. 1000 Hr.  Cyclic  Rig Test - 1800F - Diesel  Fuel (1% Sulfur) Air/Fuel Ratio:
   30/1, 5 ppm sea  salt
Alloy
IN -738
Alloy 713C
Udimet 500 (wrought)
Udimet 500 (cast)
Surface Loss, mg
3.1
130+ **
3.5
8.8
Max. Penetration, mil.
15
130+ **
21
36
    * * Specimen consumed

5.  Sulfidation Cyclic Rig Test (150 Hr.)  - JP-5R Fuel, 3.5 ppm salt, about 17/1
   Air/Fuel Ratio

Alloy
IN -738
Alloy 713C
Udimet 700
Peak Temperature
1550F
Wt. Loss, gms.
2.1
5.5
4.0
1750F
Wt. Loss, gms.
4.0
7.1
7.9
6.  Sulfidation Cyclic Rig Test (173 Hr.)  - JP-5R Fuel, 3.5 ppm salt, about 17/1
   Air/Fuel Ratio

   Cycle of 1550F/3 min. - 1850F/2 min. - cooled 2 min.
Alloy
B1900
IN -738
MDL20
Mar M421
Wt. Loss, gms.
6.8
2.5
3.0
4.2
                                                                                           71

-------
      '10                    100                   1000                 10.000
                                    TIME. HR
Figure 2. Time VS. Weight Loss Plots For Several Alloys at 1450 F in Presence
                   of Eutectic Na2S04-MgS04 and 0.15% S02.
  7. Combustion Chamber Test-Fuel Oil doped with 5 ppm Na, .SppmMg, 1%S-1450F
Alloy
IN -738
X-45
Udimet 500 (wrought)
Wt. Loss, % in 50 Hr.
.183
.206
.143
8. Crucible Test Na2S
Alloy
IN- 738
Udimet 500 (cast)
Alloy 713C
04, MgS04 under a gas of .15% S02, 2.25 Co, N2 - 1450F
Wt. Loss (mg/cm2) after
32 Hr.
.32
.35
8.3
64 Hr.
.56
.51
23.
136 Hr.
.97
.71
90.
250 Hr.
1.4
500 Hr.
3.3
  9. GasTest-1800F(100Hr.)-FlowingH2Sand S02-rich gas to accelerate corrosion
Alloy
IN- 738
Alloy 713C
Udimet 700
Wt. Loss, mg/cm
310
770
1440
 10. Engine  Test  - 1780F (45 Hr.) (.75  ppm  sea salt) 40 min. cycle (30 min. at
     1780F,  10 min. ram cool air)
Alloy
Alloy 713C
Mar M246
TRW VIA
235D
IN - 738
Udimet 710
Rating (higher number
indicates increasing resistance)
1
1.1 times corrosion resistance of 713C
1.4
1.9
. 6.2
5.8
    The behavior of IN-738 and several other alloys in a eutectic mixture of Na2S04
    - MgS04 at 1450F is shown in Figure 2.
                                                                                        72

-------
            MECHANICAL PROPERTIES

            TENSILE PROPERTIES
            Typical properties obtained on heat treated, cast-to-size test bars (fine grain 5 1/8"
            diameter) are as shown below. Property ranges are plotted in Figure 3 in comparison
            to those of 713C.

Temp.
F
RT
1350
1500
1600
1700
1800
0.02%
Yield Strength
psi
128
_
— •
—
_
-
0.2%
Yield Strength
ksi
138
122
100
80
59
50
Tensile
Strength
ksi
159
145
127
112
81
66

Elong.
%
5.5
3
3
11
13
10

R.A.
%
5
4
3
13
14
15
            Limited data obtained at R.T. on coarse grain (3/32-5/16" diameter)  bars have been
            essentially the same as shown above.
Stress Rupture Properties (See Figure 4)

    Rupture properties obtained on heat treated, fine-
grain, cast-to-size test bars are as follows:
Temp.
F
1350
1350

1350
1400
1400
1450
1500
1500
1500

1600
1700
1700

1700
1800
1800
1800

1800
1800
1825
Number
of Tests
1
11

1
1
2
1
1
1
4

2
1
6

1
1
1
19

1
1
1
Stress
psi
100,000
90,000

80.000
90,000
85,000
60,000
70,000
55,000
40,000

40,000
35,000
33,000

26,000
25,000
24,000
22,000

18,000
15,000
16,000
Life :
Hr.
93
139-291
Avg. 211
452
89
130-155
976
29
261
2794-3947
Avg. 3205
312-430
29
97-109
Avg. 104
190
55
65
39-96
Avg. 78
116
269
148
Elong.
.%
13
4-7
6
4
4
6
4
14
11
4-6
5
9
15
6-11
8
14
6
—
12-20
15
24
-
6
R.A.
%
20
8-9
9
6
8
-
5
17
14
4-8
6
13
17
13
13
—
-
—
19-25
23
27
-
14
                                                    <=>  "RT    1000    1200    1400    1600    1800    2000
                                                                       TEMPERATURE, F

                                                     Figure 3. Typical  Tensile Properties of IN-738
                                                              Compared to those of 713C.
                                                                                                       73

-------
           Limited rupture data on coarse grain (1/4") cast-to-size bars are as follows:
Temp.
F
1350
1350
1500
1500
1700
1700
1800

1800

1800
1800
Number
of Tests
2
1
1
1
1
2
3

4

1
1
Stress
psi
90,000
88,000
70,000
55,000
35,000
33,000
29,000

22,000

20,000
18,000
Life
Hr.
216
224
29
269
41
52-116
9- 16
Avg. 14
30-95
Avg. 66
128
132
Elong.
%
4.5-6
9
10
8
11
6-10
15
15
6-16
12
10
13
R.A.
%
8-11
12
12
10
16
12-17
18-32 '
27
17-30
23
27
25
                          A Larsen -Miller parameter plot of the above data is
                          shown in  Figure 5. Data on 713C and  IN-100 are
                          shown for comparison.
100 rr
                 • FINE GRAIN (£ 1/8")
                 x COARSE GRAIN (S 1/4")
                   100             1000
                  RUPTURE  LIFE,  HRS
     Figure 4. Stress Rupture Properties  of Cast-
               fo-Size Bars of IN-738.
10,000
5
L
>
9
»
1
J
C
l>
1
^^
-
-
-
-
~ • •^•B
55$.




^^
"^



- IN-IOO
— IN-738
— ALLOY 7I3C
1 1

5v£x





X
^


1
_
-
^
-
-
-
40   42     44    46
          P - T (20* Log
48
      50
             n
         Figure 5. Larsen-Miller Stress Rupture Parame-
         ter Plot Comparing  IN-738,  1N-100 and 713C.
                                                                                                      74

-------
IMPACT PROPERTIES

Unnotched Charpy impact value (ft.-Ib.) of samples tested at R.T. after various elevated
temperature exposures are as follows:




Grain Size
Fine < (1/8")
Coarse > (1/4")

Impact
Value
Prior to
Exposure
56
37
Room Temperature
Impact
1200F

500
hr.
44
54
1000
hr.
30
38
Value After Expc
1500F

500
hr.
20
20
1000
hr.
13
16
sure at
1700F

500
hr.
14
17
1000
hr.
10
14
THERMAL FATIGUE  RESISTANCE

The  thermal fatigue resistance of IN-738  and  of several  other cast alloys was  de-
termined using a fluidized bed  for heat transfer. This  method involved alternate 2
minute immersion of 1-5/8"  diameter tapered  disc specimens, with 0.010 in. edge
radius, in hot and cold beds.
                           Thermal  Fatigue Cycles to First Crack
Alloy
713C
• IN-100
IN -738
Peak Temperature of
1472F (800C)
>1462
>1372
1790
1652F (900C)
107
107
150
1832F (1000C)
27
29
13
                                APPENDIX  I
      METHOD  FOR CALCULATION OF ELECTRON  VACANCY NUMBER
1.  Convert the composition from weight per cent to atomic per cent.

2.  After long time exposure in  the Sigma forming temperature range, the MC carbides
   tend to transform to M23(^(5.
   a. Assume one-half  of the  carbon forms MC in  the  following preferential order
     TaC,  CbC,  TiC.
   b. Assume  the remaining carbon forms M23C<5  with  the  M comprising 23 atoms
     of Cr.

3.  Assume the boron is tied up as Mo 38 3.

4.  Assume the gamma prime to  be (Ni-8Co.2)3 (Al, Ti, Ta, Cb)

5.  Assume the residual matrix  will consist of the atomic per cent minus those atoms
   tied  up in the carbide  reaction,  boride reaction, and the  gamma  prime reaction.
   The total of these remaining atomic percentages gives the atomic concentration in
   the  matrix. Conversion of this on a 100% basis  gives the atomic per cent of each
   element remaining in the matrix.  It is this percentage that is used in  order to
   calculate the  electron vacancy  number.

6.  The formula for calculation of the electron vacancy number is as follows:
     Nv  =  .66 Ni  +  1.71 Co  +  2.66 Fe  +  4.66 Cr +  6.66 Zr  + 9.66 (Mo  +  W)
                                                                                           75

-------