T
E
VOLUME II
1972
-------
THE ECONOMICS OF CLEAN WATER
VOLUME II
DATA AND TECHNICAL APPENDICES
ENVIRONMENTAL PROTECTION AGENCY
1972
For sale by the Superintendent of Documents, U.S. Government Printing Office
Washington, O.C. 20402 - Price $4.75
Stock Number 5501-0378
-------
TABLE OF CONTENTS
Page
GENERAL INTRODUCTION 1
PART I
INDUSTRIAL FACILITIES EVALUATION MODEL
INTRODUCTION 5
MODELS DEVELOPED 7
Water Use/Employee Evaluation 13
Basic Industrial Cost Evaluation Requirements 21
Output Program—Cost Evaluation 49
Capital In Place Evaluation 67
MODELING TO DEFINE THE COST OF ALTERNATIVES AVAILABLE FOR INDUSTRIAL
WASTE MANAGEMENT 81
FUTURE ANALYSES THAT APPEAR PROMISING 87
PART II
BASIC DATA AND RESULTS
INDUSTRIAL FACILITIES EVALUATION MODEL
INTRODUCTION 91
NATIONAL SUMMARY TABLES 93
STATE SUMMARIES FOR MANUFACTURING 101
Al abama 103
Alaska ! 106
AH zona 109
Arkansas 112
-------
PART II (Cont.)
California 115
Col orado ] ] 8
Connecticut ^
Del aware
District of Columbia 127
Fl or i da ] 30
Georgia 133
Idaho 136
111 inoi s 139
Indiana 142
Iowa 145
Kansas 148
Kentucky 151
Louisiana 154
Maine 157
Maryl and 160
Massachusetts 163
Michigan 166
Minnesota 169
Mississippi 172
Missouri 175
Montana 178
Nebraska 181
Nevada 184
IV
-------
PART II (Cont.)
New Hampshire 187
New Jersey 190
New Mexi co 193
New York 196
North Carolina 199
North Dakota 202
Oh io 205
Okl ahoma 208
Oregon 211
Pennsylvania 214
Rhode Island 217
South Carol i na 220
South Dakota 223
Tennessee 226
Texas 229
Utah 232
Vermont 235
Vi rgi n i a 238
Washington 241
West Virginia 244
Wisconsin 247
Wyomi ng 250
NATIONAL SUMMARIES, BY SPECIFIC SIC 253
EPA ADMINISTRATIVE REGION SUMMARIES FOR MANUFACTURING 441
INDUSTRIAL WATER USE REGION SUMMARIES FOR MANUFACTURING 475
-------
PART II (Cont.)
REGIONAL INDUSTRIAL WATER USE PER EMPLOYEE BY SIC CODE TABLES 531
SIC 20-2035 537
SIC 2036-208 538
SIC 2082-2221 539
SIC 2231 -2282 540
SIC 2283-264 541
SIC 2641-2819 542
SIC 282-287 543
SIC 2871 -3079 544
SIC 31 -327 545
SIC 3273-3315 546
SIC 3316-3356 547
SIC 3357-343 548
SIC 3431-3493 549
SIC 3494-3541 550
SIC 3544-358 551
SIC 3581 -3631 552
SIC 3632-3673 553
SIC 3674-374 554
PROJECTION INDICES: OUTPUT AND WATER PRODUCTIVITY 555
PROJECTED INDUSTRIAL WASTE TREATMENT EXPENDITURES IN MILLIONS OF 1967
DOLLARS BY SIC CODE THROUGH 1976 567
PART III
POLLUTION INDEX
POLLUTION INDEX: LOGIC AND METHOD 629
vi
-------
PART III (Cont.)
FEDERAL ADMINISTRATIVE REGION SUMMARY BY SECOND ORDER WATERSHEDS 639
Region 1 641
Region II 644
Region III 648
Region IV 656
Region V 663
Region VI 668
Region VII 672
Region VIII 676
Region IX 680
Regi on X 683
PART IV
SURVEY OF PLANNED CONSTRUCTION
OF MUNICIPAL WASTE TREATMENT FACILITIES
PROCEDURE 687
VI1
-------
GENERAL INTRODUCTION
This volume was prepared to provide information and detail for the
analyses presented in Volume I. EPA hopes that further studies will
be conducted by many persons engaged in the water resources and waste
management areas and that the material provided here is a part of their
analytical base.
X
The Appendix is in four parts. Part I contains the general discussion
of the Industrial Facilities Evaluation Model which was developed to
provide the industrial costs for wastewater treatment. In part II,
there is presented the detailed output from the industrial model along
with some of the basic water use/employee information developed for the
model. Part III contains the logic and method of the pollution index
along with the summary results by second order watersheds and EPA adminis-
trative regions. Last, in Part IV, the procedure and questionnaire used
in the 1971 assessment of planned construction of municipal waste
treatment facilities.
1.
-------
PART I
INDUSTRIAL FACILITIES EVALUATION MODEL
-------
INTRODUCTION
The question to be answered is:
What is the cost of wastewater treatment to U.S.
industry assuming that industry must reach the
equivalent of secondary wastewater treatment as
stated in the Water Pollution Control Act.
A further refinement of the question is:
Give me the answer to the above question broken
down by significant industrial types.
This question was asked to provide a basic input into determining the
economic impact of pollution control on U.S. industry. Both air and
water pollution control costs were considered in the overall analysis
of economic impact. The analysis to be discussed here only considers
the factors relating to industrial wastewater pollution control.
The group responsible for carrying out this study was employed by the
Environmental Protection Agency in the Water Quality Office, Division
of Planning and Interagency Programs, Systems Analysis and Economic
Studies Branch.
The approach taken to answer the question posed was, as the title
indicates, to develop and use an economic cost model of U.S. industry
which we feel represents the high cost abatement measures U.S. industry
could take and the costs associated with these actions.
The cost model is in a sense a misnomer in that the cost analysis con-
sisted of many models and separates analyses used as input to a final
stage of the analysis the costing out of industrial wastewater pollution
control measures and then presenting this information in most enlighten-
ing and complete form we felt was appropriate.
In any analysis of this type the analytical form is quite significantly
shaped by the data available. Were this analysis postponed for a year
or more, it is possible that more detailed data on U.S. industrial waste
discharge may have been available, but the luxury of time was not ours.
The most basic data elements available were: The Dun and Bradstreet
file of Industrial Manufacturers in the United States whose basic com-
ponents of value to us were the location of the manufacturing plant
(State, county), the type of primary business engaged in (Standard Indus-
trial Classification Code--[SIC]), and the number of manufacturing em-
ployees at the plant; 1967 and 1963 Census of Manufactures—Water Use
in Manufacturing from which we were able to obtain an estimate of region-
ally distributed water use per manufacturing employee by SIC code, current
industrial wastewater treatment practice, and approximately how many
plants engaged in manufacturing we should be considering in our analysis;
-------
and wastewater unit treatment process cost functions relating waste-
water flow to capital cost and operating and maintenance costs.
With these three basic elements and many other important analyses and
research we feel we have brought these pieces together to form a reason-
able answer to: what is the cost of wastewater treatment to U.S. indus-
try assuming that industry must reach the equivalent of secondary waste-
water treatment as stated in the Water Pollution Control Act?
-------
MODELS DEVELOPED
Figures A through C show the basic steps involved in this cost
analysis. The following items explain the numbers which are
indicated in each figure.
-------
EXPLANATION OF NUMBERED AREAS
IN FIGURES A THROUGH C
(1) Basic Data File:
Specific industries
listing
industry type
location
employment
(2) Basic Data File:
Industry type, location
water use, employment
industry type
water use per employee
locationally defined
(3) Literature Search
and Experience
industry type
unit treatment processes
used
percent of total flows
expected to pass through
each unit process
(4) Literature Search
and Experience
industry type
number of working
days per year
(5) Literature Search
and Experience
industry type
waste strength
(non-dimensional)
relative to municipal
(6) Literature Search
and Experience
unit treatment process
capital & O&M cost
as a function of
waste flow
(7) Literature Search
and Experience
industry type
capital cost factors
regionally defined
operation & maintenance
cost factors regionally
defined
(8) Literature Search
and Experience
construction cost factor
for contingencies asso-
ciated with construction
(9) Basic Data and Manual
Summary
number of plants in an
industry group using
various waste treat-
ment processes
(10) Basic Data and Manual
Summary
flow in each treatment
by all plants in an
industry using that
process
-------
IMT6RH60IAT?
DATA
DOT POT
PROOiRAMS
OOTPuT TO AFP Ro PR I AT 6
OP D6TA1L. '
1
DATA
HOOSU
-------
FIGURE 8
CAPITAL Itf
PLACE MODEL
\
oor Pur
SUMMARY OF THIS I
our Pur TO
OF
i
1
CAPITAL I* PUC.S DATA
IN Ptfttc
10
-------
FIGURE C
CAPITAL iw PcAc.(s OArA
T«M6 TO WOf^lC OFF
ANNUAL ft/vte OF
TO
T6c.HWOU>tlCAt- LSV&L WITH
No WATSi SAV/IW&
11
-------
DISCUSSION OF WATER USE PER EMPLOYEE MODEL
Overview
A central component of the industrial cost model to define required
treatment by industry was a mechanism to relate industrial activity as
measured by industry types, employment sizes, and locations of indus-
tries to waste generated by these industries. Waste generation was
measured in terms of quantity (flow) by an analysis of the 1967 Census
of Manufactures, Water Use in Manufacturing to determine water use
per manufacturing employee discriminated by type of industry (4-digit
SIC Code) and location (Water Use Region—elsewhere defined).
Table 2 from the 1967 Census of Manufactures, Water Use in Manufacturing
provided the following detail required for the analysis.
Data—Table 2--Water intake by purpose, Gross Water Used, and Water Dis-
charged: 1968
A—Industry Group and Industries
employees
water intake
process water intake
gross water used
total water discharged
Data—Table 2--Water intake by purpose, Gross Water Used, and Water Dis-
charged: 1968
B—Water Use Regions, Major Industry Groups, and Industries
employees
water intake
process water intake
gross water used
total water discharged
Mathematical Formulation
The model defining water use per manufacturing employee basically forms
ratios of regional to national totals to define variability between major
classes of manufacturers geographically and also looks at the variability
between industrial classes within a major manufacturing class. The water
use per employee values define the process water per employee coming into
contact with the product stream; the final equation is defined as follows:
WT4R/ex = WP4 x WP2R1 x WU2R1 x WU4
vej ~E4 WI4
Where the process water to be treated is constrained to be no greater
than the total amount of water discharged.
13
-------
The parameters are defined as follows:
E -- emoloyment
WI -- water intake
WP — water intake specifically used in product processing
WD — water discharged
WU — water used (gross used in plant including recirculation
and reuse)
WT -- TOTAL WATER IN CONTACT WITH PRODUCT STREAM
Further discriminators for designating the parameters
4 — four-digit SIC Code
2 — two-digit SIC Code
R — water use region designator—(if no R exists the para-
meter is assumed to be a national value)
(e) — designates a per employee value
primes -- represents ratios calculated between regional and
national values
Incrementally, the model was built using the following logic:
(a) process water per employee ratio; regional defined ratio at
the major industrial class level
WP2R1 = WP2R / E2R
WP2 / E2
(b) recirculation ratio; regionally defined ratio at the major
industrial class level
WU2R' = WU2R / WI2R
WU2 / WI2
(c) water discharged per employee: represents the maximum water
to be treated per employee for each industrial category,
regionally defined
WD4R/e\ = WD4 x WD2R / E2R
PT WD2 / ET~
(d) process water per employee coming into contact with the product
stream defined by industrial category and region
WT4R(e) = WP4 • WP2R' • WU2R1 . WU4
"^ WT4"
Where: WT4R{e) = WD4R(ej
If: WD4R(e) ^R(Q}
14
-------
The program used to calculate these regionally defined water use per
employee values for each industrial category studied where data existed
follows: the basic parameter definition for the model is applicable to
the program.
15
-------
PROGRAM LISTING
FOR
WATER USE PER EMPLOYEE MODEL
17
-------
DIMENSION WP2R( I?) »i','U2* (17) «WI2K( 17) »t.2RU7) «NEG( 17) »
XWO?P(17) »IR(17)»T<5) ,NRSIC(17) ,WT'->R<17> »TN<5>
DATA NEG/17»0/
ICOUNT=0
ICK=1
1 READ(10»1000»END=100) NSIC1»NSIC3»TN
1000 FORMAT(2X«2I2»4X.5F10.0)
1020 FORMAT(I2«I4,4X»5F10.0)
IF(NSIC3.EO.O) GO TO 15
GO TO 1
2 READ(10»1000,END=100) NSIC1»NSIC3,TN
3 CONTINUE
IF(NSIC3.EQ.O) GO TO 15
4 CONTINUE
DO 5 I = l,»5
IFUN(I).LT.0.0) GO TO 2
5 CONTINUE
E4=TN(1)
WI4=TN(2)
WP4=TN(3)
W04=TN(4)
WU4=TN(5)
DO 10 I=l»17
IF(NEGd).NE.O) GO TO 8
WT4R(I)=(WP4/E4)«WP2R
-------
IF(ICK.EQ.O) GO TO 20
18 READ(12,1020,END=25) IT»ITSIC,T
IF(IT.LT.ICK) GO TO 25
20 IR(IT)=1T
NRSIC(IT)=ITSIC
E2R(IT)=T(1)
WI2R(IT)=T(2)
WP2R(IT)=T(3)
WD2R(IT)=T(4)
WU2R(IT)=T(5)
ICK=IT
DO 21 1=1,5
IF(T(I).LT.0.0) NEG(IT)=1
21 CONTINUE
GO TO 18
25 ICK=0
DO 30 I=ltl7
IF(IR(I).EQ.O) GO TO 29
IF(NEGU) .GT.O) GO TO 28
WP2R(I)=WP2R(I)*E2/(E2R(I)*WP2)
WU2R(I)=(WU2RCI)»Wl2)/(WU2*rtI2R(I)
GO TO 30
28 WP2R(I)=0.0
WU2R(I)=0.0
GO TO 30
29 NEG(I)=1
30 CONTINUE
GO TO 4
100 STOP
END
DISP=SHR,DSN= .WSORTNAT
DISP=SHR,OSN= .WSORTREG
UNIT=2314,DISP=OLD,DSN=
//GO.FT10F001 DO
//GO.FT12F001 DO
//GO.FT19F001 DD
// VOL=SER=
ft DCR=(RECFM=V8,LRECL=80»BLKSIZE=7204)
/*
WUPEMP.
19
-------
DISCUSSION OF THE INDUSTRIAL REQUIREMENTS COST MODEL
Overview
The industrial requirements cost model estimates the costs of required
waste treatment assuming no industrial waste treatment facilities existed
and estimates the costs of industrial waste treatment already in place,
both in 1967 dollar terms. These two sets of values form the basis for
estimating the cost of unfulfilled treatment requirements by industry.
These unfulfilled requirements are then scheduled to be satisfied by
1976 to determine cash requirements needed. Capital and operation and
maintenance costs are included in the analysis.
Some of the basic assumptions made in developing the model and preparing
the associated data are:
A. Large industrial water users will most probably require their
own waste treatment facilities rather than using municipal sys-
tems. Where this is not the case, industrial plants will choose
to use a municipal system because of savings to that plant. This
presumably represents a solution at a lower cost than calculated
for that plant.
B. The large industries analyzed represent the approximately 15,000
largest water using industries, the number and distribution of
establishments using in excess of 10 million gallons per year
according to the 1963 Census of Manufactures—Water Use in
Manufacturing (the last year for which this data is available by
SIC code).The Census aggregates information on industrial
water use from those industrial plants reporting annual intake
of water in excess of 20 million gallons. Our analysis went to
one lower classification of water users, to the 10 million gal-
lon per year level, to represent the aggregate cost to all the
smaller self-discharging industries treating or having to treat
their own wastes.
C. These approximately 15000 largest water using industries discri-
minated as to number of plants within each of 320 SIC code cate-
gories were assumed to also represent the largest industries in
in terms of manufacturing employment within their respective
SIC code groupings.
D. Continuous flow through treatment processes were used to typify
treatment processes used by these large industries. These pro-
cesses were determined from an extensive literature research of
recently published industrial solutions to waste treatment pro-
blems and a review of these findings by a team of industrial
experts.
21
-------
E. Segregation of waste streams to pass through these unit proces-
ses was assumed where the literature or common sense dictated
this approach.
F. Cost estimates for each unit process on the basis of quantity
of waste treated were derived from comparable municipal unit
process experience. These were modified upward as necessary
to account for high strength wastes with the necessity to de-
sign for longer detention times and more chemical addition to
effect changes in the waste streams sufficient for discharge.
G. Waste treatment units were also scaled upward to account for
the number of days of operation of a facility, such that a
food processing plant operating 150 days per year would have
a higher daily flow rate than a textile mill operating 300
days per year discharging the same annual waste flow.
H. Waste treatment units were not scaled up to the degree of muni-
cipal systems in that the industrial plants were not considered
to suffer from seasonal variability of infiltration and peaking
flows from storm water runoff and illegal connections that muni-
cipal systems would have to face. In many cases equilization
units were included to handle the operation variability of the
industrial system.
I. Capital and operating and maintenance costs were adjusted to
account for regional variation. This was done on the basis of
water use region for capital costs and on State boundaries for
O&M cost.
22
-------
23
-------
MATHEMATICAL FORMULATIONS
Overview
Basic relationships used in this analysis involve employment, location,
type of industry, flow/employee, waste strength relative to municipal
wastes, number of work days/year, treatment processes used, the amount
of waste segregation. These relationships take the following form:
1. Cost = Function (flow, location, treatment processes used,
amount of waste segregation, type of industry)
2. Flow = Function (employment, water use/employee, number of
days worked/year, type of industry, location, waste
strength relative to municipal wastes)
Definitions
The following mnemonics are used in the basic industrial cost model for
requirements:
SFW = Waste strength scale factor
= 0.4 + 0.6 x (waste strength relative to municipal waste)
DAYR = days relative to annual flow
= 350/number of days worked per year
WU(I,J) = water use per employee (millions of gallons/year)
I = represents SIC code for industry
J = represents water use region (elsewhere defined)
OMCI(I,J) = relation of national labor cost to State to adjust O&M
national cost values for industry
CCI(J) = relation of regional to national sewage treatment plant
construction cost to adjust national capital cost values
for industry
ADBR(I) = industrial plant data
1=1= State number
I = 2 = SIC Code
{ I 4 ! defined manufacturing employment
1=5= water use region number
CFT(I,J,K) = cost coefficients
The cost function is of the form:
Log10 (Cost) = A + log1Q(Flow)(B + C x log1Q [Flow])
-------
I = i = A; I = 2 =. B, I = 3 = C
J = 1 to number of treatment processes used maximum
number of processes = 15
K = 1 = capital cost; K = 2 = O&M cost
DAYS = number of operating days per year for each industrial type
HWASTE = measure of waste strength (no parameter-oriented) relative
to municipal wastes. This is a surrogate for treatment
difficulty
TM(I,J) = treatment matrix: presentation (by SIC code for industry
[I], and treatment process [J]) of decimal amounts of total
waste stream treated by each process
TSM(I.J) = treatment scale matrix: allows alteration of flow being
treated by SIC code (I), and waste treatment process (J).
The intent of this factor is to allow TM to maintain its
physical integrity while changing the cost function where
recognized changes occur between the basic functions de-
scribing municipal costs and those observed by selected
industries
Detai1
The functional relationships for Cost and Flow are repeated:
1. Cost = Function (flow, location, treatment processes used,
amount of waste segregation, type of industry)
2. Flow = Function (employment, water use/employee, number of days
worked/year, type of industry, location, waste strength
relative to municipal wastes
Base Flow = Employment x Water Use/Employee
where water use per employee is influenced by water use region
in which the plant is located and the type of SIC code classi-
fication of the plant.
Q1 = EMP x WU(I,J)
The flow is modified to account for operating days per year and
high strength wastes
Q" = Q1 x DAYR
Q = Q" x SFW
The present model construct uses Q for capital cost and Q" for
O&M cost. The scale factor for wastes was found from experience
to represent increased design sizes of facilities with increased
26
-------
waste strength because of requirements for longer detention
times to effect comparable effluent wastewater quality. No
comparable rule of thumb experience is known for O&M costs,
so none was assumed. This piece of analysis should be re-
searched further. The unit process O&M costs assumed were
based on municipal experience and may have overstated man-
power and waste handling requirements to industry— the latter
in terms of grit removal from primary processes in a municipal
system exceeding comparable industrial requirements. On the
other hand, chemical addition by industry may be higher than
that in a municipal system. These factors act to oppose one
another. Hopefully, they strike a reasonable balance that a
more exhaustive analysis will bear out.
For further discussion the term for basic flow will be Q.
The unit process cost relationship is of the general form:
Log10 (Cost) = A + Iog10 (Q) x (B + C x log^ [Q])
where Q is a modification of Q already derived and (Cost) is for
each component of waste treatment used. Each factor in the above
equation could be subscripted with a "t" to represent the treatment
processes considered in the analysis.
Q is considered as that portion of the wastewater treated by each
unit process in the industrial waste treatment system, realizing
that waste segregation is a common industrial practice.
Q is therefore multiplied by elements of TM & TSM relating them to
the industrial type (SIC code) and waste treatment process analyzed
to obtain the Q values for each treatment process.
The cost algorithm relates annual flow to daily flow and converts the
costs to dollar terms as necessary. The resultant capital costs are then
multiplied by the regional capital cost factor for the plant location
analyzed to bring construction costs to the expected value for that
region. O&M costs are similarly scaled to national values.
The output from this model is a representation of unit process capital
and operating and maintenance costs for each industrial plant analyzed
in the nation, distinguished by State, SIC code, water use region,
whether the industry is or is not in a Standard Metropolitan Statisti-
cal Area (a fact which was not used in this analysis but which has poten-
tial implications in the waste treatment strategies which industry might
choose to apply . . . and which can be accomodated in the model), number
of manufacturing employees, and basic process water discharged. It is a
simple matter to further append the location of each industrial plant
relative to the Environmental Protection Agency regional operating struc-
ture. This allows at least the following types of outputs or combinations
27
-------
of outputs to be defined:
National totals
Selected SIC totals nationally
State totals
EPA Region totals
.Water use Region totals
Other combinations can of course be drawn out of this set. The validity
of the output is a function of the size of the set drawn. The analysis
was not intended to represent the waste treatment costs of an individual
industrial plant but an aggregate cost for various levels of detail for
industry in general.
The output from this program was written to a magnetic data set in our
case a disc, so that the appropriate levels of detail and types of output
formats could be obtained without re-running the basic job each time.
The running time of this job on an IBM 360/65 in an MVT environment is
approximately one half hour. Many levels of detail, as indicated above,
can be gleaned from running this job one time and storing the output.
Program
The program listing follows with all of its subroutines. Many of these
routines such as SETUP, LGFOUR, LGTHRE, LGTWO are written to provide
flexibility in the degree of detail of data required. The approach used
throughout this entire analysis was to use the greatest degree of avail-
able applicable data, but to allow generally appliable data to be used at
the most significant level for that industry type.
Let us take some hypothetical sets of SIC codes (outside the range of
analysis for this study to avoid any confusion).
Data Set 1 Data Set 2 Industry Type
40xx 40xx 4031
41xx 403x 4032
4111 4031 4111
42xx 41xx 4115
42xx
In actually inputting these sets of data, the values "X" would be replaced
by zero "0" since no SIC code beyond the two digit level ends in zero.
If we compare the first industry type (on the right) 4031 with data set 1,
we see that there is no comparable 4-digit SIC code, nor is there any com-
parable 3-digit SIC code. There is a comparable 2-digit SIC code 40xx
whose other data to define some aspect of this industry type would be used
for industry 4031. Looking at data set 2 we find that there is indeed a
4-digit match up of SIC codes with industry type 4031 and the data asso-
ciated with this match up would be used from this data set. So that the
28
-------
data used from data sets 1 and 2 for industry 4031 would be as follows:
Data Set 1 Data Set 2 Industry Type
40xx 4031 4031
Looking at the next industry type 4032, we again see that for data set
1 the "best" match we can make is still only at the 2-digit level; i.e.
40xx. When we look at data set 2 we see an interesting situation—there
is no 4032 but there is a 4031 and a 403x and also a 40xx . . . which one
should be chosen and why? The correct choice is 430x as the "best" match-
up between 4032 and data set 2. The reasoning goes like this:
SIC code 4032 is a specific industry type distinct from 4031, but
falling into the class 403x and also 40xx, so the other distinct
SIC code 4031 should not also represent 4032. SIC 403x is a more
specific SIC code indicator than 40xx and should more closely repre-
sent 4032. Therefore, the data used for industry type 4032 would
be
Data Set 1 Data Set 2 Industry Type
40xx 403x 4032
Comparable reasoning prompts the following choices to be used in our
logical set. It should be noted before too much ire is generated
that other schemes could have been chosen; this was convenient and
the data was put together accordingly:
Data Set 1 Data Set 2 Industry Type
40xx 4031 4031
40xx 403x 4032
4111 41xx 4111
41xx 41xx 4115
One word of caution in setting up your data sets to run this program;
input one SIC value larger than any you plan to use in your analysis
for each data set or you will get into an unending loop. The other
solution is of course to change the program. The program was written
to solve a problem, not to be a software package for any user—unfortu-
nately this, like most other programs written, has many of the idiosyn-
cracies and hard ways to solve a simple problem that any analyst not
overly concerned with programming niceties can conjure up.
The program is basically quite straightforward except as already noted
and should be able to be easily followed by anyone familiar with FORTRAN
IV and an IBM 360/65 system. The job was executed from a low speed termi-
nal on a remote job entry basis. Many of the data sets used were also
stored in the low speed terminal data set environment which necessitated
much less job control language than if another environment were used.
29
-------
PROGRAM LISTING
FOR
THE INDUSTRIAL REQUIREMENTS COST MODEL
AND
RELATED SUBROUTINES
31
-------
INDUSTRIAL REQUIREMENTS COST MODEL
L-S-T DATA SET > WCOSTjfm <
// EXEC FORGCLGG,REGION=180K,TIME=1440
//SOURCE.SYSIN 00 OATA
DOUBLE PRECISI ON DTCC(16,2»,DTOMC(Ift,2) ,DO, DTQ,OEMP,DWU,DTM,DSF
OGUBLE PRECISION OCOEF(3),DCAPF,DOMF,DAYR,0SFW,OSFACT
C DOUBLE PRECISION
INTEGER ADBR(6),ODBR<6)
DIMENSION TCC(16,2),I2<5),PCC(16),POMC«16 ),
XTOMCI16,2),T3<3),CCI(17),OMCI(2,51),CFT(3,16,2),IM5),I3<5)
COMMON TM<50,16,2),TSM(50,16,2),WU«50,13),DAY(50,2),WASTE(50,2)
C MUST INSERT READ FOR NUMBER OF TREATMENT TYPFS AND SMSA DISCRIMINATOR
C NfRT=NO. OF TREATMENT PROCESSES DEFINED FOR PROBLEM
C NSMSAC=CHOICE TO DISCRIMINATE BETWEEN NON-SMSA AND SMSA
C NSMSAC=BLANK OR ZERO...NO DISCRIMINATION
C NSMSAC=NON-ZERO........DISCRIMINTAION AND MUST PROVIDE SUFFICIENT
C OATA TO HANDLE THIS
C NOTE .. MS .. DEFINES SMSA DISCRIMINATOR THROUGHOUT PROGRAM
C
READ<5,1093) NTRT.NSMSAC
HERE
C
C
1093 FORMAT(2I2)
IF(NTRT.EQ.O,
IF(NSMSAC.EQ,
IFINSMSAC.NE,
NTRT = NTRT-H
IERROR=0
NUM = 0
READ IN COST
OR
0)
0)
,NTRT,
MS = 1
GT.15) GO TO 300
FACTOR MATRICIES
READ STATF DIFFERENCES FOR 0&M
1 READ(8,1090,ENO=2) (OMCI(I,J),I=1,2)
GO TO 1
READ IN REGIONAL CAPITAL COST FACTORS
2 READ (9,1091) (CCI{J),J = l,17 )
INITIALIZE THEN READ IN PROCESS COST FUNCTION COEFFICIENTS
DO 3 1=1,3
DO 3 J=1,NTRT
DO 3 K=l,2
3 CFT(I,J,K)=0.0
4 READ!11,1092,END=6> N,K,T3
00 5 1=1,3
5 CFT{I,N,K)=T3(I)
GO TO 4
C FORMAT1090 DEFINES Ofil* COEFFICIENTS BY STATE: CALLED WOMCOST
1090 FORMAT(F2.0,3X,F10.01
C FORMAT 1091 DEFINES REGIONAL CAPITAL COST FACTORS: CALLED WCAPCOST
1091 FORMATU7F5.0)
C FORMAT 1092 DEFINES COST FUNCTION COEFFICIENTS FOR A,B,C BY TYPE
32
-------
1092
6
AOBR(2)=
AORR(3) =
VJB-*(4) =
A03R(S)=
AOSR (6)=
TREATMENT AND BY CAPITAL AMD OCV COST.. K=l AND K=? RESPECTIVELY
EQUATION OF THE ^OKM L OG ( COS T )= AfLOG ( FLO W M B+C*L OG ( FLOW ))
FJRMAT< 12,11 ,37X,3F10.0)
CONTINUE
READl 10, 1000,END=500) ADBR
THESE ARE TRAPS FOR RECOGNIZED DCS BAD DATA...
IF< ADBR (3) .GF.3) ADBR i 31 = 1
IF( AOBK( 3) .EQ.2. ANO.AOBP. ( 2).EQ. 3291) ADRR(3)=1
STATE NUMBER
SIC.*1 NUMBER
EXPONENT ON EMPLOYMENT
BASE 10 MULTIPLIER FOR EMPLOYMENT
REGION NUMBER
SMS A CODE
CFOR^AT 1030 DEFINES DUN AND BRAOSTREET DATA
1000 FORM AT(12,13X, 14, 4X, 11,13,12,11)
C BEGIN PROGRAM SETUP HERE FOR VARIABLE DATA MATRICIES
IFILL=0
SIC=A06R( 2)
ISIC^SIC
SIC4=( ISIC/100)*100
CALL SETUP (SIC4, IFILL,MS)
IFILt= 1
CALL LGTWO ( S I C , I 2 , I 3 , 14 , I F 1 1 L , SI C2)
IFILL= 0 IF MATCH CAN BE MADE
IFILL = 500 IF VALUE IN ARRAY IS LARGER THAN THE 2 DIGIT SIC
THIS IS ERROR AND PROGRAM SHOULD STOP
IS READ AND NO SIC2 IS AVAILABLE FOR USE
BE RESET AND RUN WITH SAME D&B RECORD
C
C
C
C
C
IFILL = 9999
IF THE ARRAY
ARRAYS MUST
IF ( IFILL-500) 3,79,79
8 CALL LGTHRE ( S 1C , 12 , I 3, I 4, I F I LL , S I C2 )
C IFILL WILL= 0 OR 9999 IF NO VALUE. GE
IF { IFILL-500) 10, 10, 71
10 CALL LGFOUR ( S I C , I 2 , I 3, 14 , I F ILL , S I C2 )
C IFILL WILL BE AS IFILL IN
-------
(TCC( I,J),I=2,16),J=ltMS),
TCC( [ , J) = I)TCC( !• J I
2S TUMf. ( I , J) =9TOMC< I , J)
WR ITE( 30,6000)01*Ri?) ,OOBR(5) ,NUM.
X((Tn^C(I,J),I=2,16),J=l,MS)
WRITE(3?,6000) ODBR<2),ODBR(5) ,NUM,((TCC( I ,J ) , I = 2,I 6) , J = ]
X( (TOMC(UJ),I=2,16),J = 1,MS)
6000 FORMAT(J 3 A4 )
30
C
C
C
C
C
C
C
C
C
D 0 10 J = I , 2
DO JO I=l,NTRT
DTCC ( I , J)=0. 0
DTOMC( I, J) = 0.0
GO TO 100
STATEMENTS 40 --- 50 DEFINE PROGRAM ACTIVITY
CONTINUE
II 111= I4( 5)
I) AYS = DAY ( 1111,2)
HWASTE=WASTF( III I I ,?)
CALL LGSCLO (DAYS,DAYR)
CALL LGSCLW (HWASTE.SFW)
OSFW=SFW
EMP=AOBR(4)*10**4DBR(3)
WRITE(6,4500) 14 ( 1 ) , I 4 ( 2 )
4500
FORMAT('
I=I4( 2)
L4
I 4 ( 3 ) , I 4( 4) ,
3=', 14,' 4='
5 ) , AOBR { 2 )
14,' 5= « , 14 , • S IC= ' , I 5 }
IN EACH SUBROUTINE
WILL HAVE TO BE CHANGED AS THE DATA IMPROVES
J=WATER USE REGION
DO=BASIC FLOW TO USE
OEMP=EMP
DWU=WU(I,J)
D:)T=DEMP*DWU*DAYR
CQT=OQT
K=l= NON-SMSA : K=2-SMSA
K=AD8R(6)+1
THE NEXT SET OF STATEMENTS
IF(K.LT.i) K=l
IFK.GT.2) K = 2
II=I4(1)
AT THIS POINT CHECK SMSA DISCRIMINATOR TO SET K VALUE FOR EACH PLANT
IF(NSMSAC.EQ.O) K=l
111=14(3)
DO 50 J=2,NTRT
IF(TM( II,J,K).EQ.0.0) GO
IF THF PERCENT
THERE IS NO
DTM=TM(FI,J,K)
DQ=DQT*DTM
IFOQ.LT.0.05) GO TO 510
00 49 L=l,2
IF(TSM(I I I,J,L).EQ.0.0) GO TO 491
IF THE SCALF FACTOR FOR THE WATER GOING TO
FOR CAPITAL COST ... L=l : OR O&M COST,
THEN DON»T CALCULATE THIS COST
DSF = TSM( II I , J,L )
DSFACT=DSF
IF(L.EO.l) DSFACT=DSF*OSFW
MM = 0
DO 41 M=l,3
OCOEF(M)=CFT(M,J,L)
TO 510
OF PROCESS WATER IN THF
NEED TO CALCULATE COSTS
J TH TREATMENT PROCESS
BE
TREATED =0
1=2
34
-------
i • '• •>« '" r ' ' ) . .- ).') .0 ) '-I'' ."'. t '
>i c INI i XIUF
IF <\Ll COST COt-F ICI'INTS ^ 0 DON'T CALCULATE COSTS
IF ( .V1.F-,J.3) GO TO 491
NOTE NUM SHOULO EQUAL TWICE THE NUMBER Of RECORDS READ AT MOST
CALL LGCFN ( 11 3 ,D SF ACT , OCOFF , DCOST , L )
GO TO (42,43),L
42 IR = A'1RR{5)
DCAPF=CC KIR)
:1TCC(J,K)=DTCC(J,K ) + DC.OST *OC *PF
PCC( J) = DCOST*r>CAPF
GO TO 49
43 03 44 JA=1,51
JB=JA
•^ = AD-10( 1 )
IFIR.FQ.OMCH 1, JA) ) GO TP 45
44 CONTINUE
GO TO 75
45 OOM^OMCI (2,JB)
DTOMC ( J,K)=()TOMC( JfK)4-nCOST/OOMF
GO TO 49
491 IF(L.E0.2) GO TO 492
°CC( J )=0.0
GO TO 49
492 POMCI J)=0.0
49 CONTINUE
GO TO 50
510 PCCl J )=0.0
'^OMC( J 1 = 0.0
50 CONTINUE-
C WRITE( 6f 4610) ADBRt 2) ,f MP,COT
C WRITE (6,4611 I ( PCC( J ) , J= 2, NTRT )
C WRITE (6,4611) ( POMCI J) ,J = 2, NTRT)
4610 FORMAT(' SIC, FMP, TOT FLOW' , I 8, 2F I 5. 6 1
4611 F ORM AT (1X.8H1 2.5,7, 1X.7E12.5)
WR I TE (40,6001 ) A08R( l),AOBR(2),AnBR(5),ADBR(6),EMP,CQT,
X(PCC( I), 1=2, 16), ( PO^C( I ), 1=2, 16)
6001 FORMATO6A4)
4600 FORMAT! I5,lX,I3,lX,I2,2X,10Q11.3,/,14X,5nil.3)
C WRITE(6,4600) AOflR ( 2 ) , AOBR ( 5 ) , ADBR ( 6 ) , ( DTCC ( I , 1 ) , I =2 , N TR T )
C IF(NSMSAC.FQ.O) GO TO 52
C 51 WR ITE ( 6,4600) A03R(2) , AD8R( 5) , ADflR (6) , ( DTCCI I ,2 ) , 1=2, NTRT )
C 52 WRITE (6, 4600) AOBR (2) , AOBR (5) , AOBR (6) , ( OTUMC ( I , I ) , I =2, NTRT )
IF( N5MSAC.FQ.O) GO TO 54
C 53 WRITE (6,4600) A D3R( 2) , AOBR (5) , AOBR( 6) ,(OTOMC ( I , 2 ) , I =? , NT RT )
54 CONTINUE
GO TO 14
60 CONTINUE
C WILL WRITE TOTALS HERE FOR REGIONAL CHANGE THEN CK FOR SIC CHANGE
DO 61 J=1,MS
00 61 1=2, NTRT
TCC( I , J)=DTCC( I, J )
61 TOMC1 I ,J) =OTOMC( I ,J>
C WRITE (30,6000) ODBR ( 2 ) , 008R ( 5) , NUM, ( ( TCC ( I , J) , I =2 , I 6) , J = l , MS ) ,
C X( (TOMC( I ,J> ,1=2,16) ,J=1,MS)
C WRITE! 32,6000) 008R<2) , ODBR ( 5 ) , NUM, ( ( TCC ( I , J ) , I =2 , I 6 ) , J = l , MS ) ,
C X( (TOMCU ,J), 1 = 2, 16),J = 1,MS)
NUM=0
35
-------
70
c
2000
5070
71
5071
72
5072
73
5073
74
5074
75
5075
76
5076
77
5077
78
5078
79
5079
90
100
TO 600
100,40,76
108
110
112
200
C
C
00 f>> J=l,2
f)Q 62 I=2,NTRT
)TCC=0.0
IF(TERROR.fcQ.60) GO
IF(OOBR(2)-AOdR{2) )
CONTINUE
THIS AREA CAPTURES GLITCHES AND SETS PROGRAM UP TO START AGAIN
WRITE 16,2000) AOBR
FORMAT!' DATA OUT OF ORDER •,I 2,13X,I 4,4X,I 1,I 3,I 2,11)
v/RITE(6,5070)
FORMAT!« STMT
GO TO 90
WRITE(6,5071)
FORMAT!' STMT
GO TO 90
WRITE(6,5072)
FORMAT!' STMT
GO TO «0
vJRITF(6,5073)
FORMAT(
GO TO 90
WRITE! 6,5074)
FORMAT!' STMT
GO TO 90
WRITE(6,5075)
FORMAT!1
GO TO 90
WRITE(6,5076)
FORMAT!1 STMT
GO TO 90
WRITE(6,5077)
FORMAT!' STMT
GO TO 90
WRITE(6,5078>
FORMAT!• STMT
GO TO 90
WRITF<6,5079)
FORMAT!• STMT
GO TO 90
IERROR=IERRDR-H
IF!IERROR.GE.10)
GO TO 200
CONTINUF
NEW 14(1) VAUJFS
SIC=ADHR(2)
SIC2=SIC/100.
IF!SIC2.GT.38.0) GO TO 77
SIC4=(SIC/100.)*100.
CALL LGTWO !SIC,12,I 3,14,IF ILL,SIC2)
IF!IFILL-500) 108,78,200
CALL LGTHRE
IF(fFILL-500) 110,110,200
CALL LGFOUR
-------
IS1C=SIC
SIC4 =(ISIC/100)*100
CALL SETUP (SIC4, IFILL ,MS)
GO T3 100
500 IERROR=60
GO TO 60
600 -JsITE (6,2100) IFRRQK
GO TO 601
300 VRITfc(6,3000) NTRT
3000 F."1RMAT(« NONE OR BAD DATA FOR NTRT=',I5)
601 CONTINUE
2100 RlRMATt' IF.RROR VALUF = ', 110)
DE8UG SU-iCHK, TR AC E , IN I T ( I F I L L , Of, OS T ) , UN I T (4 3)
AT 6
TRACE ON
4T 601
TRACE OFF
STnr>
END
SUBROUTINE SETUP (S 1C , I F I LL,MS)
CO^'-ION TV (50, 16,2) ,TSM(50, 16,2) , WiHSO.l*) ,0 AY (50, 2) ,WASTF(50,2)
C
C INITIALIZE MATRICIES
DO 2 1=1,50
I
2
5
3
00 1 J=l ,16
00 1 K=i ,?
TM( I , J ,K) =9999.
TSM( I , J ,K 1 =9999
00 2 J=1,18
rf'J( I , J> =9990.
rtEGIN READING I
00 5 1=1,50
DO 5 J=i,2
OAY( I,J)=9999.
WASTE( I, J)=9999
N= 10
.
NTO
.
00 50
GO TO (10,20,30,35,40),M
10 IC=l
101 t)0 II K=l,MS
11 REAO(N,1900,(:NO = 50) ( TM ( I C , J , K ) , J= I , I 6 )
IF(TM<1C,I,1).LT.SIC ) GO TO 101
1010 FQRMAH 2 (2X,9(E 10.3.2 X ) ,/»
1000 FORMAT ( I X,10(E11.4,1X),/,1X,6(EI 1.4,1X))
C DO 111 K=l,MS
C 111 WRITF(6,1000) (
IF( IC.LT.49) GO TO 101
GO TO 50
20 IC=l
21 REA9(N,1910,END=50) ((TSM( 1C,J,K),J=1,16),K= I,2)
IF(TSM(1C,1,1).LT.SIC) GO TO 21
C
IC=IC+l
IF(IC.LT.49) GO TO 21
GO TO 50
30 lC=i
37
-------
! »[> (••!-> V\T r I-') -?LAi! MUST i,t!\F°RM
U J! V)( h: , 5 000, t NJO-50) ( '.sUi I C , J) , J = l , 14 I
IF ( vlf 1C, I ) .LT .S 1C ) GO TO 31
C W-UTC (6, 1010) ( -JU( 1C, J) , J=l, IP)
5000 FfH^AT( 18A4)
IC= IC + 1
IF(IC.LT.49) GO TO 31
GO TO 50
35 IC=1
C FORMAT 1950 DEFINES NUMBER OF WORK DAYS/Y EAR
C i)ATA SET NAME 3. V00005 . WD A Y
3^. RE Ar)(N,l930,6N!)=50) ( !) AY I I C , J ) , J= I , 2 )
IFMAY(IC,LJ.LT.SIC) GO TO H6
C WRITE(6, 1020) (OAY( 1C,J),J=l,2)
IC=IC+1
IF
//GO.FTLLFOOl DD DISP=SHR,DSN= WCSTABC2
38
=( ,SL)
, UNI T= ( 2400-3) ,
-------
FT12FOOI
FT14F30L
FT16F901
//GO.
//GO.
//GO.
//
//GO
//GO.
//GQ
//GO
//GO
//
//GO.FT43F001
/*
FT18F001
FT20F001
f T^OFOOl
FT3PF001
FT^OFOOl
DSN=I
D I SP=SHR ,DSN= .WTMACTSL
D I SP = SHR , DSM =< -WTSM2
V'1L = SER = , DSN = . WIJPE.MP . LOW
B,LRFCL = 7? , BLKS I Z F_ = 7 200 ) ,UNIT = 2314,!)ISP = OL
0 I SP= SHR , D SN= .WDAY
D I SP= S HR , OSN = .WWAST6
DUMMY
DUMMY
UNJIT=?314,VOL=SER= i 0 ISP=
-------
L-S-T DMA SFT > LGTWO
S HBP OUT INF LGTWO(SIC,I?,I3,I4, IpHL,SIC2)
niviFNSIOM I 2(5) , 13(5) ,14(5)
COMMON TM(50,16.,2),TSM(50, 1 ft, 2 ) , WU< 50, I « ) , OAY( 50, 2 ) , W A STF < SO , 2 )
100 CONTINUE
lc( IFILL.FQ.O) GO TO 2
00 1 1=1,6
m 1 1 = 1
i^« i ) = i
i i '+ 1 n = i
IFILL=0
r on 3 I=1,5
f IF( IM I J.GT.I2I I ) 1 12(11 = 14(1)
C IM 13 ( M.GT. T2( I) ) I2(I)=I3(I)
I SIC=SIC
sir,2=( mc/ioo)*ioo
r i=]=TM=TRFATMFNT MATRIX
c [=?=WH=WATFR DSP MATRIX
r I=I = TSM=T°F I\TMFNT STALE MATRIX
f. i=4 = nAY=DAY? WORKFO/VR MATRIX
00 19 1=1,5
10 TO (4,6,«, 10, 12), I
ft T1=TM(N,1,1)
r,f) TO /v
6 T2=WU(N,1)
IF(Sf2-WI)(N,l )
7 N=M+1
c»n TO 6
a, T3 = TS^(M,1 , 1)
IP( SIC2-TSM(fv,l
GO TP
1 1 N
GO TO 10
12 T5 = WASTF ( *!, 1 )
IFI^IT^-WASTMM,!)) 2°,la,13
GO TO 12
IP I?(I)=M
GO TO 30
20 IM TM( N', 1 ,1) .FO.900-3. ) GO TO 50
IF( WIJ( N, 1 ) .FO.qoqo. ) r,1 T^ 50
IFILl=500
40
-------
IF(TSM(N,1,1).FQ.9<»99.) GO TO 50
RFTURN!
26 IF(n/W
-------
SFT > LGTHPf
r
r
F LGTHPCfSTC, 12, 13, 14, !<=!!!. ,SfC?)
i?(5) , n{5 i, IM M
Sfi,2),WASTF<50,2)
MATRIX
=?=WU=WATFB USF MATQIX
=3=TS^=TRFATMFNT SCM.F
=/v=ni Y=nav<; wpPKPn/YP AR
s i c = s i r
SIC^=( ISICVIO) *
on 3 i =1 ,^
IF( IM i >.r,T.n(
D^! 31 1 = 1 1 5
N=I"»( I )
GO TO (4,6, «,^P, 70) , I
IF ( Sm-TM(N, 1 ,1 ) ) l'
GO TT 4
14, 10,7
TO
IF( SIT 3-TSfMM,l ,1) ) 16 t 10,0
N=N+1
nn rn R
N,l) ) 17,10,60
70
71
10
16
17
13
20
?•>
30
50
51
GO T0 68
IF(STC1-WASTF
-------
AT Si
TR£f.<-
OFF
43
-------
_<;_T DAT/V <;CT > LGFGUR <
ICFOUO ( S 1C , I?, 1 ^» I <+i I F H L , STC2)
i ? )
r | = i =y M=TQ p^TMFMT ^flTRIX
r J = ?=WIJ = W^TFP O<;F MATRIX
r I = ',= TSM=TRF ATMTNT ^CiLF MATRIX
r =4
SlC4=ISTf
on ^o 1=1,5
N=I4( T )
^,0 TO f-Vtft,«,6P, 70) , T
-------
L-S-T DATA STT > LGCFN <"
SUBROUTTNr LOCFM ( 00 f nSF , HCOFF , DCOST , L )
rjnnoLc PRFCISriN DO , OSF , DC OF F ( 1 ) , OCOS T , D A , OR , DC , TQC ,
J nA=OCOFF( 1)
or=DCOFF( 3)
r COST ru^cTIO"' IS np THF BASIC
r ni.or, io(r.nsT> = nA*( ne+oc*DLnf, mnon> i *nLnr, 10(000)
r CAPITAL COST RASCO HM MGO AND RFPRF.SFNTS TOTAL CHST IM DHLIARS
r
r nf.M r.nST BASFn ON won AND RFPRESENTS COSTS IN CCNTS
r
f DTP IOOQ nai I PNS HF WASTF TRFATFn
r CAPITAL CnST Ft PW OOO^OQC / ^50 OPERATING DAYS PF" YEAR
C
r n£M COST FLOW nQD-OOr/^50 HPFRATING DAYS PER YFAR
r
C CAPITA!. COST*; WILL COMF OUT IN DOLLARS FROM OCOST
r
C Hf.M rnSTS WILL HAVr Tn a,r MULTIt1LIcn BY (OQC.*1000) TO OFT TOTAL
f CFMTS ..... THCN niVIOFH BY 100 TO GET HOLLAR VAIUFS.
r T.F. SA^F AS ( DOC*10)*DCGST
.LT.P.OOO^) GO TO
IF(nC.LF.O.n) GO TO 20
DCHST = DA-MDLOC10(r)Qr)) ) * ( OB-M DC *DLOG10 ( HOD ) ) >
GO TO 50
SO
GO TH (00,70) tL
IF L=] .. .CAPITAL COST : «-? ... OF.M COST
TO ocnsT=ncosT*(OQc*io. )
GO TO or)
7S r>c.o$T = n.o
CnNTTN'lF
OF RUG SI!PCHK,^UPTRAr-Ff(JNIT{43)
AT 1
AT Q!
T^ACF OFF
RFTIJC'M
FNT
45
-------
L-S-T DATA SFT > LOSCLQ <
SURRnuTFNF l.GSCLO {DAYS,nAYR)
DOUBLE PRFCISIQN DAYR
DAYSS=DAYS
r THIS PROGRAM CALCUIATFS SIZING BASED ON DURATION OF FLOW
C IF NO. OF DAYS IS GREATER THAN 350 ( 7DAYS/WK FOR 50 WKS)
C DAYR=1.0
C IF NO. OF DAYS IS LFSS THAN 350 SCALE PLANT FLOW BY DAYR WHFRE:
r nAYR=350./DAYSS
C IF NO. OF DAYS IS UNSPFCICIEO.. IF, EQUAL TO ZERO .. DAYR=350./250.
IF(nAYS.LT,350) GO TO 10
3 DAYR=1.0
RETURN
10 IF(DAYS.EO.O.O) DAYSS=?50.
nAYR=350,0/OAYSS
RETURN
END
46
-------
L-S-T DATA SFT > LGSCiW <
SUBROUTINE LGSCLW (HS,SF) -
C
C THIS ROUTTNF CALCULATFS THF SCALE FACTOR TO USF FOR CAPITAL COSTS
C BASFD ON HIGH STRFNGTH WASTF (HS) VS MUNICIPAL WASTE UOOMG/L 800)
C
IF(HS.GT.400) GO TO 10
SF=1.0
RFTURN
10 SF=0.6'
RETURN
END
47
-------
DISCUSSION OF THE OUTPUT PROGRAM
FOR THE INDUSTRIAL REQUIREMENTS COST MODEL
Overview
This program serves two basic purposes. The first is to incorporate some
of the cost factors which could most appropriately be varied such as the
interest rate and rate of replacement of capital, respectively 7.7 per-
cent and 5 percent per year as used in one final analyses. Non-struc-
tural costs associated with capital outlays for construction such as
engineering, legal and administrative fees, and some added land costs were
included as scaling factors for appropriate levels of Standard Industrial
Classification Codes for industry. The second purpose, and most consuming
portion of the program, is the preparation of the data for display. Maxi-
mums, minimums, totals, averages, and standard deviations of many factors
are determined and the input data which requires preparation by being approp-
riately sorted is then run through this analysis and printed out. This
operation required approximately one and one-and-a-half minutes of computer
time on the IBM 360/65 in an MVT environment and consists primarily of I/O
interrupts.
There is little need to go through any detailed explanation of this program.
However, about three points for clarification can be quickly made.
1. The term PC is the total annual cost for each industry and is made
up of three components; interest 7.7 percent, replacement of capi-
tal 5 percent both of total capital cost, and annual operation and
maintenance cost.
2. After the read statements from file 40 there is a statement JSK=
JJSIC/100 which can be changed depending on the level of detail
required for SIC code output.
3. Intermediate programs are required to sort the output from the
COSTOOB into the order desired for output. The discriminates
used after the read statements from file 40 are the determining
factors as to how the sorts should be made. This next comment
is directed specifically at those persons actually planning to
run this program: If an output requiring the EPA regions is re-
quired—as shown in the program coding—another intermediate
program must be run to add the EPA regions to the output file
of COSTJOB according to State number, or add this data to the
input of COSTJOB and pass the data through it.
Definition of Terms Used
Input
JS - State number based on Dun and Bradstreet numbering
JSIC - 4-digit SIC code for industrial plant used
JWREG - Census of manufacturers water use region as modified
49
-------
(elsewhere defined)
JSMSA - Whether the industrial plant is located or not located
in a Standard Metropolitan Statistical Area (not used
as a discriminator in this analysis)
EMP - Number of manufacturing employees working at the indus-
trial plant as determined from Dun and Bradstreet data
CQT - Basic total treatable flow as calculated in the COSTJOB
already discussed
TCC(I) - Total capital cost for each treatment process prescribed
for a particular SIC code as discussed in COSTJOB
TOMC(I) - Total operating cost as for TCC(I) above
JEPA - Environmental Protection Agency Region number
WINCR - Increase in basic capital costs due to costs for engi-
neering, legal, and administrative fees and some addi-
tional land costs. These values are associated with
industrial types through the SIC codes
RI - Range of capital cost values to determine distribution
of costs in the program
ROM - Range of O&M cost values for distribution analysis
ANAME - State name associated with a State number. This is only
used when State summaries are presented
Output
I EPA
IWREG
BXAME
ISIC
XPLAMT
ER(I)
QR(D
TCCR(I)
TOMCR(I)
TACR(I)
Environmental Protection Agency Region number
Water use region number from the Census of Manufactures--
Water Use in Manufacturing—modified (elsewhere defined)
State name
Standard Industrial Classification Code
Number of industrial plants being analyzed in this out-
put selection. The total is 14499
Manufacturing employment information based on summary of
all manufacturing plants within certain selection criteria
specified, i.e. State, EPA region, SIC code, etc.
1=1- maximum
1=2- minimum
1=3- average
1=4- total
1=5- standard deviation
Basic total treatable flow information on same basis as
ER(I)
Total capital cost information for only structural costs.
This is the cost transferred to the construction industry
(on same basis as ER[I])
Total annual operation and maintenance cost information
on the same basis as ER(I). This does not include in-
terest and capital replacement cost
Total annual cost on the same basis as ER(I). This
50
-------
AC(I)
DOMC(I,J) -
includes annual O&M cost, interest, and replacement
of capital
Annual cost totals broken down as follows:
1=1- operation and maintenance
1=2- capital replacement
1=3- interest charges
1=4- total
Annual operation and maintenance costs excluding interest
and capital replacement distributed as requested in the
input of ROM(J), 0=1,5 i.e. for 5 levels of costs in
descending order
1=1- maximum
1=2- minimum
1=3- average
1=4- total
1=5- standard deviation
1=6- number of plants falling into
this cost range
DIR(I,0) - Distribution of investment requirements by industry in-
cluding capital cost and non-structural costs. The dis-
tribution is as requested in RI(J), J=l,5 i.e. 5 levels
of costs in descending order; and "I" as defined in
DOMC(I,J)
PCC(I.J) and
POMC(I,J) - Are respectively the capital and O&M treatment costs for
individual treatment types (1=1,12), for all industry in
the class under consideration
0=1- maximum
0=2- minimum
0=3- average
0=4- total
0=5- standard deviation
51
-------
OUTPUT PROGRAM
CODING
53
-------
INDUSTRIAL REQUIREMENTS OUTPUT PROGRAM
(For EPA Regions)
// EXEC F03GCLGG,REGION=150K
//SOURCE.SYSIN DO DATA
C
C
THIS JOB IS TO DUMP THF INDUSTRIAL MODEL DATA IN SOME ORDERED ARRAYS
DIMENSION TCC( IS) , TOMC( 15) , ANAMEI 57,6) , BNAMEJ5)
DIMENSION ER(6) ,OR(6) ,TCCR(6) , TOMCR(6) ,TACR(6)
DIMENSION OOMC( 6, 5) ,DIR(6,5),AC(4)
DIMENS ION POMC<6, 12),PCC(6, 12)
DIMENSION ROM(5) ,RI(5), 12(1), 13(1), IM1)
COMMON WINCR(50,2)
DATA ER,QR,TCCR,TOMCR,TACR,DOMC,DIR, PCC , POMC , AC ,ROM ,
XRI
C
C
C
C
C
C
C
C
C
I=1=MAX VALUE
I=2=MIN VALUE
I=3=AVERAGE VALUE
I=^=TOTAL VALUE
I=S=STANDARD DEVIATION
I=6=NUM3ER IN SET OF DATA
INITIALIZE VALUES
NPL ANT=0
IEND=0
IFILL -9909
NTRT= 12
NUMBERED
NUMCK=0
READ(5,1000) RI
REAO(5,1000) ROM
1000 FORMATJ 5F10.0)
C
C
DO 2 1=1,57
2 READ( 15, 1001) (ANAME( I,J),J=1,6)
1001 FORMAT(F10.0,5A4)
1030 FORMATf 37A^)
1 READ(40,10301 JST,JS1C,JWREG,JSMSA,EMP,CQT,
X(TCC( I ), 1 = 1,15), (TOMCd ), 1 = 1, 15),JFPA
IFJEMP-EQ.0.0) GO TO 1
JSIC=JSIC/SOME VALUE SUCH AS 10...100
JSIC=JSIC/100
3 CONTINUE
IST^JST
ISIC=JSIC
IWREG=JWREG
ISMSA=JSMSA
IEPA=JEPA
NPLANT=1
TC=0.0
TOM=0.0
SIC=ISIC
54
-------
SIC.-?- ( I S /100 )*1')0
I F( IP ILL . ).9^99) GO TO
4 CALL LG2S(SIC,I2,I3,I4,IFlLL,Sir2)
IF( IF ILL.F 0.9991) GO TO 5?0
IF( IF ILL .FQ.500) IFILL = 0
CALL LG3S(SIC, 12, 13, 14, IF ILL, SI C2)
IF( IF ILL. EO. 9799) GO TO 300
CALL LG4S < SI C , I 2 , I 3 , I 4 , IF I LL , SIC2 )
IF( IFILL.EQ.9999) GO TO 300
Il=I4( 1)
CST IMC='VINCR ( llf 2 )
DO 6S K=l,5
D'~)MC(2,K) = 1.0E20
31 ^ ( > t K) =1.0E20
66 CONTINUE
DO 5 I=1,NTRT
TC=TC*Tf,C{ I )
TIC = TC*CST INC
PC=TC*0. 127+TQM
OH 6 1=1,4
ER( I)=EMP
QR(I)=CQT
TCC^t I )=TC
TOMCR( I I =TUM
TACRI I ) =PC
ER( 5)=FMP*FMP
QR(5)=C JT*CQT
TCCR(5) =TC*TC
TAC"(5) =PC*PC
C
C DISTRIBUTION BEGINNING
IFITOM.LE.ROMd ) ) GO TO 1
K=l
GO TO 9
7 00 * 1 = 1 ,4
J=I
K=I*1
IF(TQM.GT.ROM(K) ) GO TO 9
8 CONTINUE
C CAN'T GET HEPE WITHOUT ERROR
GO TO 500
9 00 10 I=lt4
10 OOMC( I ,K)=TOM
OOMCt 6,<) = i.O
C
IFtTIC.LE.RK 1)1 GO TO 11
K=l
GO TO 13
11 00 12 1=1,4
IF(TIC.GT.R I(K) ) GO TO 13
12 CONTINUE
CAN'T GET HERE WITHOUT ERROR
GO TO 500
13 DO' 14 1 = 1,4
55
-------
I '•» J I " ( I , < } = T I C
)m5,K) = TIC*TtC
0 I 9 ( S , K ) = 1 . 0
C
T) 17 J=l,NT«T
OQ 15 1 = 1,4
PCC ( I t.H =TCC( J)
is PHMCI i , j ) = roijic< J)
PCC(5, J)=TCC( J )*TCC( J )
PGMC(5, J)=TOMC( J)*TOMC< J)
IF( TCC(J) .LE. 0.00005) GO TO 16
PCC(n » J) =1.0
16 CONTINUE
1F( THMC( J ) .LE. 0.00005) GO TQ 17
P'JMC(6, J) = l .0
L7 CUNTINUF
r
IB REA0140, 1030, END=400 ) JST , J S I C t JrfREG , J SMSA, EMP ,CQT ,
X(TCC( I ) , I =1,15) , (TDMC< I),I=1,1S),JFPA
C JSIC=JSIC/Sn^F VALUE... 10... 100
JSIC = J<:. IC/100
C DISCRIMINATORS ARE USED HERE
IF UEPA-JEPA) 100,20,500
C ?20 IF( ISIC-JSIC) 100,20,500
C CAM ADD STATE DISCRIMINATOR HFRE
C CAN *DD WATF-? USE DISCRIMINATOR HERE
C CAN 40.') SMSA DISCRIMINATOR HERE
C
20 CHNTINU6
IF(EMP.EQ.O.O) GO TO IB
TC=0.0
TOM=0.0
DT 21 I=1,NTRT
TC = TC*TCC( I )
21 TOM=TTM+TQMC( ! )
TIC=TC*CSTINC
PC=TC*0.
ISIC = JS 1C
ER( 1) = AMAX1( EMP,ER( I) )
Q«( 1) =AM4XKCQTtOR( 1 ) )
TCCR( U=AMAXl( TC,TCCR( I) )
TGMCR ( l)=AMAXl( TOM,TOMCR(
TACR( 1) =AMAXl(PC,TACR( I) )
ER (2) = AMIN1
QR(2)=AMIN1(CQT,OR(2) )
TCCR(2) = AMIN1(TC,TCCR(2N
TGMCR(2)=AMINi(TOM,TOMCR(2)
TACR(2)=AMIN1(PC,TACR(2) )
DO 25 1=3,4
ER( I)=ER( I I
QR( I) = QR(I UCQT
TCCRI I ) = TCCP( I >+TC
TOMCRf I )=TOMCR( I
25 TACRl I ) = TACR(I
5)=QR(5)<-CQT*CQT
56
-------
TCCR(5)=TCCR(5)+TC*TC
TOMCRl 5)=TOMCR( 5)+-TOM* TOM
30 CONTINUE
IF(TOM.LE.ROM(1 ) ) GO TO 31
K = l
GO TO 35
31 DO 32 1=1,4
K) ) GO TO 35
32 CONTINUE
C CAN'T GET HERE WITHOUT AN ERROR
GT TO 500
35 DOMC(l,K)=AMAXl(OOMC(I,K) ,TOM)
DOMC(2,K)=AMINl(DOMC(2,K),TOM)
DO 36 1=3,4
36 DOMC(I,K)=DOMC(I,K)+TOM
OOMC (5,K) = UOMC(5,K)>-TOM*TOM
OOMC(6,K)=DOMC(6,K J-H.O
C
40 CONTINUE .;V
IF(TIC.LE.RI(1)) GO TO 41
K=l
GO TO 45
41 DO 4? 1=1,4
J=I
IF(TIC.GE.RKK) ) GO TO 45
42 CONTINUE
C CAN'T GET HERE WITHOUT ERROR
GO TO 500
45 DIR( 1,K)=AMAXKDIR( 1,K) ,TIC)
DIR(2,K)=AMIN1(DIR(2,K),TIC)
DO 46 1=3,4
DIR(I,K)=DIR(I,K)+TIC
46 CONTINUE
DIR(5,K)=OIR(5,K)+TIC*TIC
QIR(6,K)=DIR<6,K)-H.O
C
DO 60 J=1,NTRT
PCC(1,J)=AMAXl(PCC(1,J),TCC(J))
IF(TCC(J).LT.0.0005) GO TO 50
PCC (2, J) = AMINKPCC(2, J) , TCC ( J ) )
50 CONTINUE
PCC(3,J)=PCC(3,J)+TCC+TOMC
-------
POMC< 6, J) = POMC (6, Jl + 1.0
53 CONTINUE
60 CONTINUE
C THIS ENDS ALL CALCULATIONS BUT THE ANNUAL COSTS BY O&M,REPLACE, INT,
C WRITE(6,1775) JSIC
C1775 FORMAT(• NEW RECORD',18)
GO TO 18
100 CONTINUE
C THIS PART OF ROUTINE WRITES OUT TOTALS AND SENDS CONTROL BACK
C TO INITIALIZATION OF MATRICIES I STATEMENT..3)
C
AC( 1) = TOMCRK)
AC(2)=TCCR(4)*0.05
AC(3)=TCCR<4)*0.077
AC<4)=0.0
on 101 1=1,3
101 AC(4)=AC(4)+AC( I)
C
ER(6)=NPLANT
QR (6)=NPLANT
TCCR(6)=NPLANT
TUMCR( 6)=NPLANT
TACR(6)=NPLANT
C
C THIS WRITE STATEMENT FOR EACH INDUSTRU DEFINES OUTPUT FOR
C SUMMARIZATION AT A LATER TIME IF NECESSARY..F0 ANY OTHER SET
C
C WRITE(25,8000) IStC,ER,QR,TCCR,TOMCR,TACRtDOMC,DIR,PCC,
C XPOMC,AC
C
C8000 FORMAT(227A4)
C
C CALCULATE AVERAGE VALUES HERE
C
ER(3)=ER(3)/ER(6)
QR(3)=QR(3)/QR(6)
TCCRl3)=TCCR(3)/TCCR(6)
TOMCR(3)=TOMCR(3)/TOMCR(6)
TACR(3)=TACR(3)/TACR(6)
DO 110 J=l,5
IF(OIRl6tJ).LE.O.O) GO TO 103
DIR(3,J)=D[R(3,J)/DIR(6,J)
GO TO 10^
103 DIR(3,J)=0.0
10^ IF(DOMC(6,J)-LE.0.0) GO TO 106
OOMCI3,J)=DOMC(3,J)/DOMC(6,J)
GO TO 107
106 DOMC(3,J)=0.0
107 CONTINUE
110 CONTINUE
DO 120 J=l,NTRT
IF(PCC(6,J).LE.0.0) GO TO 113
PCC(3,J)=PCC<3,J)/PCC(6,J)
GO TO 114
113 PCC(3,J)=0.0
114 IF(POMC(6,J).LE.0.0) GO TO 116
POMC(3,J)=POMC(3,JJ/POMC16,J)
GO TO 117
116 POMC(3,J)=0.0
117 CONTINUE
58
-------
120 CONTINUE
C
C CALCULATE STANTVRD DEVIATIONS BEGINNING HERE
C
C=ER(6)
ER(5)=SD( A, B,C)
A=OR(5)
B=QR<4)
C=QR( 6)
QR(5»=SD{ A,B,C )
A=TCCR( 5)
B=TCCR(4)
C=TCCR(6)
TCCR( 5) =SO( A,B»C)
C=TOMCR(6)
A,B,C)
A=TACR(5)
C=TACR(6)
TACR( 5)=SO( A,3,C)
C
00 130 J=l,5
C
A=DIR<5, J)
B=DIR(4, J>
C=DIR(6,J)
D[R(5, J)=SD( A,B,C)
C
A=DOMCl 5,J>
B=OOMC(4t J I
C=OOMC(6, J)
OOMC( 5,J)=SO(A,B,C)
C
130 CONTINUE
DO 140 J=1,NTRT
C
A=PCC(5, J)
B=PCC(^, J)
C=PCC(6, J)
PCC(5,J)=SO( A,B,C)
C
A=POMC(5, J)
B=POMC(^, J)
C=POMC(6,J)
5i J)=SD( A,B,C )
CONTINUE
C NUMCK=NUMCK+l
C IFCNUMCK.GT.1?) GO TO 600
DO 141 1=1,5
DO 141 J=i,NTRT
PCCd , J) = PCC( I ,J)/1000.
59
-------
(I,J)=POMC(I,Jl/1000.
141 CONTINUE
C
DO 142 J=l,5
IF(OlR(2,J).EQ.l.OE20) OIR<2,J)=0.0
IF(DOMC(2,J).EQ.1.0E20) DOMC<2,J)=0.0
142 CONTINUE
C
C FIND CORRECT STATE NAME...
C
G=IST
DO 143 1=1,57
K=I
IF(G.EQ.ANAME< I, 1)) GO TO 144
143 CONTINUE
GO TO 500
144 CONTINUE
C DO 145 1=1,5
C L=I+l
C 6NAME( [ )=ANA!MF(K,L )
145 CONTINUE
C WRITE OUTPUT TO PAPER HERE....
WRITE(6,2014) IEPA
C WRITE(6,2012) IWREG
C WRITE(6,2011) BNAME
C WRITE(6,2000)
WRITE(6,2038)
WRITE(6,2007)
C WRITE(6,2008) ISIC
WRITE(6,2009) NPLANT
WRITE(6,2001)
WRITE(6,2002) (ER(I ) ,1 = 1,5)
WRITE(6,2003> (ORCI),I=1,5)
WRITE(6,2004) (TCCR( I ),1=1,5)
WRriE(6,2005) (TOMCR(I)f1=1,5)
WRITE(6,2006) (TACR(I>,1=1,5)
WRITE(6,2010)(AC(I),I=1,4)
WRITE(6,2020)
WRITE(6,2021) ROM(1),(OOMC(1,1),1=1,6),
X<(ROM(J),ROM(J-l),(DOMC(I,J),1=1,6)),J=2,5)
C
WRITE(6,2030)
WRITE(6,202l) RI(l),(DIR(I,l),r=l,6),
X((RI(J),RI(J-1),(DIR(I,J),I=1,6)),J=2,5)
C WRITE STATEMENTS 2041 AND 2042 ARE SET UP FOR 12 TREATMENT PROCESSES
WR[TE(6,2040)
WRITE(6,204l)
WRITE(6,2042) {(PCC(I,J),J=1,NTRTI,1^1,51
C
C
WRITE(6,2050)
WRITE(6,204l)
WRITE (6, 2 042) ( (POMCU.J) , J=l ,NTRT ), I =1 ,5 )
C
WRITE(6,2060)
C
DO 150 1=1,6
DO 150 J=1,NTRT
POMC(I,J)=0.0
PCC( I,J) = 0.0
60
-------
150 CONTINUE
DO 151 1=1,6
DO 151 J=l,5
DIR( I , J)=0.0
nOMClI,J)=0.0
151 CONTINUE
C
C FORMATS FOR WRITE(]UT FOLLOW....
C
2000 FORMAT!IH1,T60,'NATIONAL TOTALS')
?038 FORMAT!T41,'FLOW OF LFAST EFFICIENT WATER USE REGION MODIFIED')
C
C
2012 FORMAT!IHl,T56,«WATER USE REGION ',13)
2014 FORMAT(IH1,T58,'EPA REGION «,I5)
2007 FORMAT(T47,'1968 FLOW CONDITIONS ( 1967 DOLLARS)1)
C
2011 FORMAT!1H1,T55,5A4)
C
2008 FORMAT!T5,'SIC CODF...',I6)
2009 FORMAT(T5, 'TOTAL NUMBER OF MANUFACTURING PL ANTS...',I 6,//)
2001 FORM4T!T34,'MAXIMUM', T54,'MINIMUM',T74,'AVERAGE',
XT96,'TOTAL «,T11B,'S.D.')
2002 FORMAT(T5,'MANUFACTURING EMPLOYMENT ', 5 ! F15 . 0, 5X) )
2003 FORMAT!T5,'FLOW !MGY)• , 15X,5(F15.0,5X))
2004 FORMAT! T5,'TOTAL CAPITAL COST',7X,5!FI 5.0,5X))
2005 FORMAT(T5,'TOTAL ANNUAL O&M COST',4X,5!F15.0,5X))
2006 FORMAT(T5,'TOTAL ANNUAL COST' ,8X,5(Fl5.0 , 5X ) ,// )
C
2010 FORMAT(T4*,'ANNUAL COST OF WASTE TREATMENT',/,
XT38,'O&M1,T53,'REPLACEMENT',T75,'INTEREST',T96,'TOTAL',//,
X31X,4!F15.0,5X),//)
C
2020 FORMAT(T42,'DISTRIBUTION OF OPERATION AND MAINTENANCE COST',
X/,T5, 'COST RANGE1,T33, ' MAX I MUM',T54,'MINIMUM1 ,T74,
X'AVERAGE',T96,'TOTAL',T118,'S.D.',T127,'NUMBER')
C
2021 FORMAT(T5,'>',F9.0,T29,4(F15.0,5X),F15.0,2X,F6.0,/,
X4(3X,F8.0,' TO •,F8 .0,T29,4(F 15 .0,5X),F I 5.0 , 2X,F6.0,/))
C
2030 FORMAT!T48,'DISTRIBUTION OF INVESTMENT REQUIREMENTS',/,
XT5,'COST RANGE',T33,'MAXIMUM1,T54,'MINIMUM',T74,
X'AVERAGE' ,T96,'TOTAL',Tl18,'S.D.«,T127,'NUMBER' )
C
2040 FORMAT(T35,'DISTRIBUT ION OF TOTAL CAPITAL COST',
X' FOR TREATMENT ($ 1000)',/)
2041 FORMAT(T12,•*!*•,T22,'*2*',T32,«*3*',T42,'*4*«,T52t'*5*',
XT62,'*6*',T72,'*7*' ,T82,'*8*«,T92,«*9*',T102,'*10*',TU2,
X'*U*',T122, '*12*' ,/)
2042 FORMAT!' MAX',T8, 12(F8.0,2X),/, ' MIN',T8,12iF8.0,2X),/,
X' AVE',T8,12(F8.0,2X) ,/,' TOT',T8,12(F8 .0 ,2X ),/ ,
X' SD STB, 12!F8.0,2X) ,//)
C
2050 FORMAT(T39,'DISTRIBUTION OF ANNUAL 0£M TREATMENT COSTS',
X' ($ 1000)',/)
C
C
2060 FORMAT!' SD OR S.D. REPRESENTS STANDARD DEVIATION. ',
X' THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.')
61
-------
c
c
IF< IEND.NE.0)
GO TO 3
GO TO 600
C
C
C
c
c
c
c
c
c
c
c
C
C
THIS PART OF PROGRAM PROVIDES FOR SETUP SUBROUTINE
300 CALL LGSETSISIC,IFILL)
NUMBER=NUMBER*1
IFdNUMBER.GT. 5) GO TO 500
GO TO 4
THIS PART OF PROGRAM GENERATES STOP
400 CONTINUE
IEND=100
GO TO 100
500 CONTINUE
WRITE(6,5100)
5100 FORMATC ABNORMAL JOB END ')
GO TO 600
520 CONTINUE
WRIT£<6,5100) JSIC
5200 FQRMATP WINCR MATRIX DOES NOT CONTAINLG SIC CODE',18)
GO TO 600
600 CONTINUE
STOP
END
FUNCTION SD(A,B,C)
A=SUM OF X(I) SQUARED
B=TOTAL SUM OF X(I)'S
C=NUMBER OF OBSERVATIONS
IF(C.LE.l.O) GO TO 800
0=ABS((A-(B*B)/C)/(C-1.0))
IF(D.LE.0.0005) GO TO 800
SO=SORT(D)
RETURN
800 S0=0.0
RETURN
END
SUBROUTINE LGSETS (SIC,IFILL)
COMMON WINCR(50,2)
INITIALIZE MATRICIES
DO 1 1=1,50
DO 1 J=l,2
1 WINCRJI,J)=9999.
BEGIN READING INTO MATRICIES
3 N=18
DO 50 M=l, 1
GO TO 10
10 IC=1
11 REAO(N,1900,END=50) ( W INCR ( 1C, J ) , J= 1 , 2 )
IF( KINCRt 1C, I) .LT.SIC) GO TO 11
C1010 FORMAT(2(2X,9(E10.3,2X),/))
1000 FORMAT(1X,2E15.6)
C WRIT6(6,1000) (WINCR( IC,J) ,J=l,2)
62
-------
IF(1C.IT.49) GO TO 11
GO TO 50
50 CONTINUE
IFILL=1
1900 FORMAT
-------
CNO
SUBROUTINE LG3S{ SIC, I 2, 13, I 4 , I FILL,SIC2 )
DIMENSION l?( 1). I3( 1), I4( 1 )
COMMON WASTF<50,2)
I=1 = *IASTE = W INCR= INCREASE CAPITAL COST MATRIX
1 ISIC=SIC *
SIC3={ISIC/10)*10
} CONTINUE
DO 30 1=1,1
N=I 3( I )
GO TO 70
70 IF(SIC3-WASTE(N,I) ) 13,10,71
71 N=N+1
GO TO 70
10 I3(I)=N
Gd TO 30
13 IFIWASTEIN,I ).EQ.9999. ) GO TO 50
GO TO 20
?0 I M I} = l2i I )
IF( K( I )-I2( I ) ) 22,30,30
22 IM I)=I2( I )
30 CONTINUE
RFTU^N
50 IFILL=9999
51 CONTINUE
5IC2=( ISIC/100)*100
DEBU.", SUB CHK,SU*3T RACE , UNIT (43)
AT 1
T^ACE ON
AT 51
TRACE OFF
RETURN
END
SUBROUTINE LG4S (SIC,12,I 3,I 4 , IF ILL,S I C2>
DIMENSION I2( 1), I3( I), IM 1)
COMMON WASTF(50,2)
I=1=WASTE=WINCR=INCREASED CCAPITAL COST MATRIX
1 !SIC=SIC
SIC4=ISIC
DO 30 1=1,1
N=IM I)
GO TH 70
70 IFl SIC4-WASTEIN, 1) > 18,10,71
71 M=N+l
GO TO 70
10 I4(I)=N
GO TO 30
18 IF(W^STF(N,l).F0.9999.) GO TO 50
GO TO 20
20 I4(I)=I3(I)
30 CONTINUE
RETURN
50 IFILL=9999
51 CONTINUE
SIC2=( ISIC/100)*100
DEBUG SUBCHK,SUBTRACE,UNIT(43)
AT 1
TRACE ON
AT 51
TRACE OFF
64
-------
RETURN
ENO
/*
//GD.FT05F001 DO D I SP=SHR,OSN- .WRANGE
/VGO.FT15FOOI OD 01SP=SHR ,DSN= .WSTATE
//GO-FT20FOOI TO DISP=SHR,OSN= .COSTINCR
//GO.FT25FOOI DD DUMMY
//GO.FT^OFOOl DD DISP=SHR,UNIT=231^,VOL=SER=
// DSM= .EPAR.PLANT
//GO.FT4^FOOl DD DUMMY
/*
65
-------
DISCUSSION OF THE CAPITAL IN PLACE MODEL
Overview
This model is quite simplistic. The assumptions made are as follows:
- The data in the 1967 Census of Manufactures—Water Use in Manu-
facturing is representative of total usable industrial activity
in water pollution abatement up to 1967.
- This industrial activity was effective in abating pollution to the
extent that units built would retain their usefulness in an upgra-
ding effort by industry where necessary.
- Industrial expenditures for this observed abatement activity could
be measured in current dollar terms by using the generalized cost
functions defined for the COSTJOB model which are based on waste
flow.
- Average flow by unit process is representative of unit process cost
for each industry type. (Note that distributional characteristics
of waste stream flow is not available for existing facilities.)
- Geographical distribution of industrial waste treatment is such
that national average cost factors are sufficiently representative
for in place facilities. (Disclosure regulations preclude geograph-
ical breakdown of these industries by the Bureau of the Census.)
- Table 8A in the 1967 Census of Manufactures—Water Use in Manufactur-
ing is used as follows to determine treatment cost functions to use:
Table 8A
Cost Function Name
coagulation-sedimentation
neutralization
flotation
sedimentation
biological oxidation
chlorination
Column Headings
coagulation
pH
flotation
primary settling minus coagu-
lation
trickling filters; activated
sludge; digestion; ponds or
lagoons
chlorination
67
-------
Definition of Terms Used
CFT(I,J,K) - Cost coefficient
The cost function is of the form:
Log-|0 (Cost) = A + log1Q (Flow) (B + C x Iog10 [Flow])
1=1= A; 1=2= B; I=3=C
J = 1 to number of treatment processes used, maximum num-
ber of processes is 15
K = 1= capital cost; K = 2 = O&M cost
P(I) - Number of plants in each treatment process category
I = 1 = SIC code
I = 2 to 12 is for the 11 treatment processes which were
available for consideration in this analysis
I = 2 = oil separation (not used)
1=3= equalization (not used)
1=4= coagulation-sedimentation (used)
1=5= neutralization (used)
1=6= flotation (used)
1=7= sedimentation (used)
1=8= aeration (not used)
1=9= biological oxidation (used)
I =10 = chlorination (used)
I =11 = evaporation (not used)
I =12 = enumeration (not used)
F(I) - Average flows associated with each treatment process . . . defi-
nition of "I" as for P(I). Variability of flow due to number
of operating days per year are handled external to the program
by accounting for this in the data entry. Operating days per
year are used in the cost routine to determine total operation
and maintenance costs
SF - Waste strength scale factor relative to municipal wastes of the
form
SF = 0.4 + 0.6 x (waste strength relative to municipal waste)
where SF is greater than or equal to 1.0
CC(I) - Capital cost associated with each treatment process "I" as
defined in P(I)
CCX(I) - Total investment requirements, structural, and non-structural
costs, "I" as for P(I)
OMC(I) - Operation and maintenance costs, "I" as for P(I)
68
-------
Discussion
The program listing to follow was hastily coded. The logic should be
sound in terms of the program producing the output consistent with the
assumptions and the results required. However, the comment statements
may not be consistent with the coding. The reader will have to sift
through this as best he can. This program is hardly worth detailed docu-
mentation. It was produced solely to present intermediate results for
the final segment of the model, the scheduling model.
69
-------
CAPITAL IN PLACE COST MODEL
LISTING
71
-------
CAPITAL IN PLACE COST MODEL
L-S-T DATA SET > WCAPNOW <
// EXEC FDRGCLGG,REGION=iaOK
//SOURCE.SYSIN DO DATA
DOUBLE PRECISION OQ,DSF,OnAY
DOUBLE PRECISION! DCOEF(3>
DIMENSION 12(5), CC(12), OMC(12),
XT3(3),CCX(12),CFT(3,I6,2),I4(5),I3(5),P(12),F(12)
COMMON A(50,16,2) ,TSM(50,16,2),DY(50,2) ,XPN(50,2).WASTE(50,2)
REAO(5,1093) NTRT,NSMSAC
1093 FORMAT!2t2)
IF(NTRT.EO.O.nR.NTRT.GT.i5) GO TO 500
IF(NSMSAC.EQ.O) MS=1
IF(NSMSAC.NE.O) MS=2
NTRT=NTRT+1
9000 CONTINUE
NUM=0
C RFAD IN COST FACTOR MATRICIES
C INITIALIZE THEN READ IN PROCESS COST FUNCTION COEFFICIENTS
DO 3 1=1,3
DO 3 J=1,NTRT
00 3 K=l,2
CFT{I,J,K)=0.0
READ(11,1092,END=6) N,K,T3
3
4
DO 5 1=1,3
5 CFTU ,N,K)=T3! I)
WRITE(6,1501) (T3(I),1=1,3)
1501 FORMAT!' CFT...•,3E15.6)
GO TO 4
1092 FORMAT!12,II ,37X,3F10.0)
6 CONTINUE
IFILL=0
7
8
1000
10
12
16
ISIC=SIC
SIC2=(ISIC/100)*100
CALL SETUP (SIC2,IFILL,MS)
REAOUO, 1000) P
READ(12,1000) F
FORMAT(F4.0,1X,UF5.0)
CONTINUE
IF(P(l)-F(l)) 12,16,8
REAO<10,1000) P
GO TO 10
CONTINUE
C
r.
WRITF<6,1503)
IP!I),1=1,12)
!F(I),1=1,12)
1503
1504
S8E14.5,/,
FORMAT!• P.
FORMAT!' F.
SIC=P(1)
ISIOSIC
SIC2=!ISIC/100)*100
IF!IFILL.EQ.9999) GO TO 300
72
-------
CALL SUR2 (SIC, 12, 13, 14, IF ILL, SIC2)
I F( [FILL. EQ. 9999 ) GO TO 300
IF( IFILL .EQ.500) IFILI=0
CALL SU33 (SIC, 12, 13, 14, IFILL, SIC?)
IF( IFILL. EQ. 9999) GO TO 300
CALL SUB4 ( SIC, 12, 1 3, I 4, I F I LL , SI C2 )
IF( IF ILL. EQ. 9999) GO TO 300
III=I4( 3)
I II 1=14(4)
It II 1=14(5)
HS=^/ASTE( I II I I ,2)
CALL LGSCLW (HS.SF)
11=14(2)
t)OAY=DYl 11,2)
C WRITE(6, 1500) ( 14 ( K ) , K= 3, 5 )
1500 FORMATC 14 VALUES . . . ' t 3 18 )
DO 30 1=2,12
L=l
t L HAO TO BE INIT I \LI7.EO BECAUSF BRANCHED INTO SECOND LOOP
F( I ) = F( I )*SF
IF(F{ I ) .LT.0.005 ) GO TO 25
00 30 L=l,2
Q = F( I )*TSM( I I I , I ,L)
IF(Q. LT.0.005. AND. L.EQ. 2) GO TO 26
IF(Q. LT.0.005. AND. L.EQ. 1) GO TO 24
00 41 MN=l,3
DCOEF( MN) =CFT(MN, I ,L)
IF( XOEF(MN) .EQ.0.0) M
41 CONTINUE
IF ALL COST COEFICIENTS = 0 DON'T CALCULATE COSTS
IF M^.EQ.3) GO TO 491
CALL LGCFN1 ( 03, DSF , DCOEF , DCOST , L , DDAY )
COST = OCf)ST
IF(L.EQ.2) GO TO 22
CC( I ) =COST*P( I )
GO TO 23
22 1MC( I )=COST*P( I)
23 CONTINUE
GO TO 30
491 IF(L.EQ.l) GO TO 24
GO TO 26
24 CC( I )=0.0
GO TO 30
25 CONTINUE
CC( I )=0.0
26 OMC( I 1=0.0
30 CONTINUE
CCXU ) = CC( 1)
00 35 1=2,12
35 CCX( I ) = CC< I )*XPM{ I III ,2)
X(CCX(I),I=2,12) ,(OMC( I ) ,1=2, 12) )
C
2000 FORMATC SIC CODE...',F5 .0,/, 1 X, 'NUMBER OF PLANTS',/,1X , 1 IF 11.0,
X/,' AVERAGE FLOW • ,/ , IX, 11 El 1 . 3,/,' TOTAL CAPITAL COST1,
X/, IX, 11EH.3,/,1 TOTAL CAPITAL COST* BUILDING FACTOR ',/,
73
-------
XIX.11E11
GO TO 7
3,/
TOTAL 0£M COST ' ,/ , IX, 1 I El I .3,///>
300
480
4300
500
9500
C
C
C
C
C
C
C
C
C
10
101
11
1010
1000
111
20
21
3)
IF( NJM.GT. 10) GO TO 480
CALL SETUP (SIC, IFILL.MS)
GO TO 16
slRl TF(6, 4SOO)
FORMAT! • TOT MANY SETUP CALLS1//)
CONTINUE
CONTINUE
DEBUG SURCHK, IN IT { SF , Q,CO ST, ODA Y ) , UN I T { 4
AT 9000
TRACF ON
AT 9500
TRACE OFF
STOP
END
SUBROUTINE SETUP ( S 1C , I F ILL , US )
COMMON TM( 50, 16,2) ,TSM( 50, 16,2) , WU (50,2) , DAY (5 0,2) .WASTE (50, 2)
INITIALIZE MATRICIES
DO 2 1=1,50
00 1 J=l,16
DO I K=l,2
TM( I , J,K) =9999.
TSM( I , J,K)=9999.
DO 2 J=l,2
w/U( I, J) = 9999.
BEGIN READING INTO MATRICIES
DO 5 1=1,50
DO 5 J=l,2
DAY( I , J)=9999.
WASTE( I , J) =9999.
N=20
DO 50 M=2,5
C
C
GQ TO ( 10,30,20,35,40),M
IC = 1
DO 11 K=1,MS
READ(N,L900,END=50) (TM( 1C,J,K) ,J= 1,16)
IF(TM(1C,1,1).LT.SIC) GO TO 101
FORMAT(2(2X,9(E10.3,2X),/))
FORMAT (1X,10(EU.4,1X),/,1X,6(EU.4,1X))
DO 111 K=l,MS
WRITE(6,1000) H TM( 1C ,J,K),J = 1,16) ,K = 1,MS)
IC=IC-H
IF( IC.LT.49) GO TO 101
GO TO 50
IC=l
READ(N,1910,END=50) «TSM(IC,J,K),J = l,16),K = l,2)
IF(TSM(1C, 1,1).LT.SIC) GO TO 21
WRITE(6,1000) ((TSM(IC,J,K),J=l,16),K=i,2)
IF( IC.LT.49) GO TO 21
GQ TO 50
30 IC=1
THIS UNFORMATTED RFAO MUST
31 READ(N,1930,END = 50) ( WU( 1C
CONFORM TO
J ) , J = l ,2 )
JOB"WUSEJOB" OUTPUT
IF(WUdCtl). LT.SIC) GO TO 31
74
-------
C WRITE(6,1020) (WU( 1C, J) , J = l,2)
C
IC= IO1
IF( IC.LT.49) GO TO 31
GO TO 50
35 IC=1
C FORMAT 1930 DEFINES NUMBER OF WORK DAYS/YEAR FOR SUBROUTINE LGSCLQ
C DATA SET NAME d.V00005.WDAY
3S READ(N,1930,ENO=50) (DAY(1C,J),J=I,2)
IF(DAY( 1C, D.LT.SIC) GO TO 36
C ^ITE(6,1020) (DAY( IC,J) , J=l,2)
IC=IC+1
IF< IC.LT.4'9) GO TO 36
GT TO 50
40 IC=1
41 READ!N,1930,END=50) (WASTF(IC,J),J=1,2)
[F(WASTE( 1C,1).LT .SIC ) GO TO 41
C WRITEI6,1020) (WASTE( 1C,J),J=l,2)
IC=IC + 1
IF( IC.LT.49) GO TO 41
GO TO 50
C FORMAT 1930 ALSO DEFINES INPUT FOR WASTE STRENGTH IN MG/L OF H.O.D.
1930 FORMAT(F4.0, IX,F10.0 )
1020 FORMAT(1X,F5.0,5X,F10.2)
50 CONTINUE
IFILL=1
C FORMAT 1910 DEFINES INPUT FOR TREATMENT TYPE & DECIMAL FLOW FACTORS
1900 FORMAT!F4.0,IX,15F5.0)
C
C FORMAT 1910 DEFINES INPUT FOR TREATMENT SCALE MATRIX NOW ALMOST
C OBSOLETE. VALUES SHOULD RE=1.0 EXCEPT FOR FINE TUNING.
1910 FORMAT(F4.0,1X,15F5.0,/,F4.0,1X,15F5.0)
C
C FORMAT 1920 HAS NO USE NOW EXCEPT FOR DEBUG... WAS USED FOR WATER USE
C PER EMPLOYEE
1920 FORMAT(F4.0,1X,17F5.0)
C
51 CONTINUE
C DEBUG SU3CHK,SIHTRACE»UNI T( 47)
C AT 3
C TRACE ON
C AT 51
C TRACE OFF
C REWIND 12
REWIND 22
REWIND 24
REWIND 26
REWIND 28
PETURN
END
SUBROUTINE SUB2 (SIC,I 2,I 3,I 4,IFILL,SIC2)
DIMENSION 12(5 ), 13(5), 14(5)
COMMON TM(50,16,2) ,TSM(50,16,2),WU<50,2) ,DAY(50,2),WASTE(50,2)
100 CONTINUE
IF
-------
?. CONTINUE
C in 3 1 = 1,5
C IF{ IM I ) .GT. m I ) ) 12 ( I ) = I4( I )
C IF< 131 I).GT.I2( I) ) mi) = I3U)
C 3 CONTINUE
ISIC=SIC
SIC2=( I SIC/I.TO)*100
C I=1=TM=TRFATMENT MATRIX
C i=2=WU=WATER USE MATRIX
C I=3=TSM=TREATMENT SCALE MATRIX
C I=4=OAY=OAYS rtORKED/YR MATRIX
C I=5=rtASTE=AVERAGE WASTE STRENGTH JMG/U BOO
DO 19 1=2,5
N=I2< I )
GO TO (4,6,R,10,12),I
4 Ti=TM(N, 1, 1)
IF(SIC2-TM(N,I,1)) 20,18,5
5 N=N+-l
GO TO 4
6 T2=WU(N,1)
IF(SIC2-WU(N,l)) 22,18,7
GO TO 6
8 T3=TSM(N,1,1)
IF(SIC2-TSM(N,1,1)) 24,18,9
9 N=N+1
GO TO 8
10 T4=OAY(N,1)
IF(SIC2-OAY(N,1)) 26,18,11
11 N=N+1
GO TO 10
12 T5=WASTE(N,1)
IF(SIC2-WASTE(N,1)) 28,18,13
13 N=N+1
GO TO 12
18 I2(I)=N
19 CONTINUE
GO TO 30
20 IF(TM(N, 1,1 ) .EQ.9999. ) Gil TO 50
IFILL=500
RETURN
22 IF(WU(N,1).EQ.9999.) GO TO 50
IFILL=500
RETURN
24 IF(TSMJN,1,1> .EQ.9999.) GO TO 50
IFILL=500
RETURN
26 IF(OAY(N,1).EQ.9999.) GO TO 50
IFILl=500
RETURN
28 IF(WASTE(N,1) .EQ-9999. ) GO TO 50
IFILL=500
RETURN
30 00 31 1=1,5
31 K( I )=I2( I )
RETURN
50 IFILL=9999
51 CONTINUE
DEBUG SUBCHK,SUBTRACE,UNIT(43)
76
-------
C AT 100
C TRACE 3N
C AT 51
C TRACt OFF
RETURN
END
SUBROUTINE SUB3 17,10,69
69 N=N+1
GO TO 68
70 IF( SIC3-WASTFIN, 1» 18,10,71
71 N=N+1
GO TO 70
10 I3(I)=N
GO TO 30
12 IF(TM(N,1,I).EQ.9999.) GO TO 50
GO TO 20
14 IF(WU(N,1) .EQ.9999. ) GO TO 50
GO TO 20
16 IF(TSM(N,1,1).EQ.9999.) GO TO ^0
GO TO 20
17 IF(DAY(N,1).EQ.9999.) GO TO 50
GO TO 20
18 IF(WASTE(Ntl).FQ.9999.) GO TO 50
GJ TO 20
20 I3( I ) = I2I 1 )
1FU4U )-!2< I ) ) 22,30,30
22 I4(I)=I2(I)
30 CONTINUE
RETURN
50 IFILL=9999
51 CONTINUE
SIC2M ISIC/100)*100
C DEBUG SUBCHK,SU3TPACE,UNIT(43 )
C AT I
C TRACE ON
77
-------
C *\ T 6 1
<~ TRACE OFT
R F T U R N
END
SUBROUTINE S'm4 ( S I C t I ? , I 3 » I 4 , I F I L L , S I C2 )
DIMENSION 12(5) , 13(5 ) , I4(5)
COM*t,N T'M'50,16,?),TSt>M50,16,?),WU<50,2),DAY(50,2),rfASTE(50,?)
C [ = L=TM=TRE AT'-IENT MATRIX
C I=2 = COEF( 1)
78
-------
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
OB=OCOEF(2)
OC=DCOFF(3)
CHST FUNCTION IS OF THE BASIC FORM :
DL OG10( COST )= DAM OB+DC*DLOG10( OQD) ) *DLOG10 ( DQ D)
CAPITAL COST BASED ON MGD AND REPRESENTS TOTAL COST IN DOLLARS
0£M COST BASED ON MGO AND REPRESENTS COSTS IN CENTS
PER 1000 GALLONS OF WASTE TREATED
CAPITAL COST FLOW DQD=DQC/350 OPERATING DAYS PER YEAR
Of.M COST FLOW nQD=OQC/350 OPERATING DAYS PER YEAR
CAPITAL COSTS WILL COME OUT IN DOLLARS FROM DCOST
O&M COSTS WILL HAVE TO BE MULTIPLIED BY (OQC#1000) TO GET TOTAL
CENTS THEN DIVIDED BY 100 TO GET DOLLAR VALUES.
I.E. SAME AS
-------
MODELING TO DEFINE THE COST OF ALTERNATIVES
AVAILABLE FOR INDUSTRIAL WASTE WATER MANAGEMENT
Introduction
Such a title to a section is extremely brash and seemingly naive, given
the complexity of industry and the possibilities available to manage
waste waters as part of a product stream or as an end product of produc-
tion. This section in reality tried to identify a range of costs open
to industry of certain water-saving assumptions without attempting to
alter the end-of-line treatment assumptions inherent in the basic analysis
Central to the discussion of all of the analyses to follow is the Water
Use Per Employee Model already described, and the Industrial Requirements
Cost Model which calculates total required industrial expenditures using
waste flow as the basis for costs and assuming as capital in place. The
question that could be posed is "what would be the impact on these costs
if industry were to reduce its demand for water based on what appears pos-
sible in other areas of the nation"?
81
-------
Basic Analysis
This analysis used "observed" water use per employee regionally defined
from the 1968 Census of Manufactures—Water Use in Manufacturing as the
basis of flow estimation from each industry in the analysis and based
cost estimates on these values.
Least Efficient Reduced
The "Basic" analysis was modified using the following rationale. The least
efficient (in water use per employee) industry group for any specific SIC
code in its respective water use region should at least be able to make
marginal improvements in water use up to the second highest water using in-
dustry group in the same SIC code in its respective water use region. In
Matrix notation the logic would assume this form:
WU(I,J)
I = SIC code
J = Water Use Region 1-17
for any I = i
find maximum WU(i,J) J = 1,2, ,17
J max = region in which maximum water use/
employee occurs for industry "i"
now find Maximum WU(i,J) J = 1,2, ,17
J / J max
J second max = region in which second highest water
use/employee occurs for industry "i"
set WU(i,J max) = WU(i,J second max)
and proceed in this manner for all industry groups I
As mentioned in the text, this is not as stringent an assumption as it
might at first appear. In each water use region there is a cross section
of industrial products produced within any of the four-digit SIC codes and
within each of these same groups there is a cross section of ages of these
industries.
There is the unexplored situation that may have occurred in the industrial
development of this nation that in certain narrow industrial groupings
development of an industry to serve the domestic and foreign needs of the
whole nation occurred early and in a short-time frame using a technology
that was advanced for its time. This type of development could have pre-
cluded significant competition from other sectors of the nation because
of a symbiotic-!ike relationship with other supporting industries in the
area being able to maintain a quasi-monopolistic advantage in its produc-
tion and sales well past the point of its seeming technologic competitiveness.
82
-------
Over expansion of production facilities during "boom times" may also
have precluded modernization due to what would be considered normal
expansion over time even within a geographic sector.
This situation, if occurring in certain narrow industrial groupings,
could account for localized economic hardships because of modernization
of methods by foreign competition and adaptation of these modern methods
by other geographic sectors of the nation where the current economic
situation is favorable to new growth in this set of industrial groupings.
It should be anticipated that where a situation like this occurs, indus-
trial development will not only take up the differential of current
production capabilities of the old producing area, but will in fact develop
its own sumbiotic-like structure and produce at lower cost those goods
required to satisfy demand.
For these isolated situations where economic devleopment occurred early
and at basically a single segment of time and also dominated the industry
for a long time, this ability to adapt to more water-saving methods may
not be as feasible as other, more healthy situations. These same "early
bloomers" will wither on the economic vine and present an economic hard-
ship to the area where they occur. Only massive reinvestment by industry
in that same area would preclude such hardships; but that massive invest-
ment would have occurred in the area any way of other economic factors
were favorable, so the likelihood of a rebirth of activity in these areas
is small.
Philosophically this presents the same dilemma to the economist faced with
the task of easing these hardships as that experienced in the medical pro-
fession: Do we have the moral right to prolong the suffering of a dying
man against his will by subjecting him to the pain and indignities of mea-
sures to maintain life without curing the malady, and expending resources
to do this rather than expending them on those who wish a cure and who
can be cured? In the same sense, the economist's aid to dying industrial
types in an area may be subjecting the people of the area to the same
types of indignities by continuing to foster a look to the past with its
apparent safety; its known structure; its potentially repressive tenden-
cies to innovation, change, and growth; its essentially analogous expendi-
tures on the dying and incurable; rather than promoting those activities
of potential growth by either a laissez-faire policy (at worst) to the
area or by active participation in healthy development by transfer of re-
sources to accomplish this.
These same economic decisions shape the objectives and more strongly the
accomplishments of an environmental protection program. In those same
certain narrow industrial groupings, those economic policies that allow
some measure of short-term continued competitiveness of an area require
one of two compensating policies. Either environmental standards will
be abrogated because of inability to finance pollution control techniques
(either structural or process change) because of the short-term nature of
expected continued operation, or federal financial arrangements with local
communities will be undertaken for joint municipal-industrial waste
83
-------
treatment facilities to abate pollution. This latter arrangement will
result in large federal-local expenditures for facilities with relatively
long design lines in relation to the industries they are designed to
principally serve. Arrangements made now to accomplish these short-term
objectives may well be operational facilities after the industry has gone
out of business.
This analysis, of the Least Efficient Industry group—regionally determined-
reduced to the next least efficient region, does not look at any of the
structural or non-structural costs outlined in this section for these cer-
tain narrow industrial groupings except for changing flow and its resultant
structural cost changes. While these ogher factors may be significant in
certain areas and certain industrial groups, the overall analytical method
should produce the measure of economic effect due to changing water use
policies by industry as a substitution for purely structural change in
terms of waste treatment.
Median Efficiency At Worst
This analysis is identical to the "Least Efficient Reduced" except the
WU(I,0) defines all J values for water use regions with water use greater
than the median region in any industry "i" at the median region value.
This again is not as radical as it would initially appear because of the
variability in industry in any region. It would, however, represent
some more significant in-plant modifications than in getting to the
"Least Efficient Reduced" condition. However, the marginal changes are
in many cases lower in going from the Least Efficient Reduced to Median than
from the Least Efficient to Least Efficient Reduced condition—in a water
use per employee sense not in a total water use for all industry sense.
At Least As Good As Most Efficient One-Third
This analysis is basically the same as those already described with the
level of water use/employee further reduced. This type analysis becomes
more tenuous the further from current practice the analysis becomes. The
basic value of this is to give a range of alternative costs for abatement,
recognizing that all costs derived are based on high capital cost solutions
to begin with. It is only in this latter context that this analysis would
be meaningful.
All Operating At Most Efficient Current Level
This result would only occur under a no discharge situation, where high
substitutions of capital for water would be required to meet discharge
requirements. In this situation, the costs for pollution abatement could
not be measured in the context of this model as currently structured.
Whole new operating rules for industry would be necessary; environmental
considerations not a part of this analysis would have to be added.
84
-------
The framework of the model under all of the above conditions of water
use/employee assumed the same waste segregation strategies and the same
relative waste strengths would pass through each unit process for each
case. The only variable was the total flow through each unit. In one
sense, such process changes as counter-current flow and generally higher
awareness of water use in processing will tend to increase waste concen-
trations; the same awareness of water use in processing could remove
water entirely from some segments of the process stream as its "free
good" stature is increasingly questioned. To what degree these factors
counterbalance one another is not known. The assumption made is that
they totally counterbalance one another.
85
-------
FUTURE ANALYSES THAT APPEAR PROMISING
IN THE CONTEXT OF THIS MODEL
Sludge Handling
This segment of waste water treatment was not considered in this cost
analysis. It represents a high unit cost item, and potentially an im-
portant solid waste and air pollution problem. The data was not availa-
ble to do a rigorous analysis. Hopefully, this deficiency can be
corrected.
SMSA Vs. Non-SMSA Handling of Waste Water Treatment
This analysis should represent only a minor cost difference to industry
in the context of the philosophy used in the initial model (definition
of high cost solutions). However, it could be more significant in defin-
ing more realistic abatement measures industry would be likely to take
due to ability to pre-treat and go to municipal systems as appropriate
or use less capital intensive land disposal techniques where possible.
Varying Waste Treatment Requirements to Account
for Lack of Water in Which to Discharge Wastes
With more specificity of location of industry and some added work (some
has begun) to define those areas of high water availability varying levels
of treatment could be defined to put the analysis closer to the environ-
mental rather than regulatory context. This work (hopefully) may well be
unnecessary with the data and decisions to come from the Refuse Act Permit
Program.
87
-------
PART II
BASIC DATA AND RESULTS
INDUSTRIAL FACILITIES EVALUATION MODEL
89
-------
INTRODUCTION
The format for many of the tables presented in this section is uniform.
Therefore, all general explanatory material and definitions are pre-
sented below.
Explanation of "Manufacturers" as Used in the Analysis
For each SIC (Standard Industrial Classification) group, the 1963 Census
of Manufacturers enumerated establishments using 10 million gallons or
more of water per year. An equal number of the manufacturers in each SIC
group was chosen from Dun and Bradstreet File on the basis of employment,
under the assumption that the most significant employers of labor in any
industry were likely to also be the most significant users of water.
Explanation of Table Format
Maximum and minimum values refer to individual plants and total, average,
and standard deviation values refer to all plants in the data set under
consideration:
I. Definitions
1. Manufacturing employment is the number of persons employed
at manufacturing plants in the data set studied.
2. Flow (mgy) indicates the flow of process water (including
recycled cooling water and sanitary wastes) used in manufac-
turing plants in millions of gallons per year.
3. Total Capital Cost is the cost of installing waste treatment
facilities for manufacturing in the data set studied.
4. Total Annual O&M Cost is the annual cost of operating and main-
taining waste treatment operations.
5. Total Annual Cost is the sum of total annual O&M cost, interest
on capital, and replacement cost (5 percent of total capital).
II. Distribution of Operation and Maintenance Cost
Annual operation and maintenance costs for treatment operations
distributed into 5 cost range groups. The number of plants in
each group is shown at the end of each line. Cost ranges indi-
cate cost per plant for O&M.
III. Distribution of Investment Requirements
Investment requirements for waste treatment for all manufacturers
91
-------
are distributed into 5 cost range groups. The number of plants
in the group are shown at the end of each line. Cost ranges indi-
cate per plant capital requirements.
IV. Distribution of Total Capital Cost for Treatment ($1000)
Investment requirements are distributed among eleven different
waste treatment processes, identified by code numbers one to
eleven:
1. Oil separation
2. Equalization
3. Coagulation
4. Neutralization
5. Flotation
6. Sedimentation
7. Aeration
8. Biological Stabilization1
9. Chlorination
10. Evaporation
11. Incineration
V. Distribution of Annual O&M Costs ($1000)
Annual operation and maintenance costs are shown for the same
eleven treatment processes found in the previous data group.
'Conventional activated sludge in petroleum and petrochemicals
Industries, aerated lagoon in all others.
92
-------
NATIONAL SUMMARY TABLES
93
-------
National Summary for Manufacturing
The national tables summarize data from all SIC codes and cover all
manufacturers in the contiguous States who are considered to use 10
million or more gallons of water per year. The set consists of five
tables all similar in makeup but different in that costs were calculated
using different industrial water use per employee data.
Often overlooked in the treatment of industrial wastes are unnecessary
overuse and leakages in a plant's operation that add to the cost of waste
treatment. When these are eliminated, a substantial reduction in water
use and treatment costs may result. These tables hypothesize the reduc-
tion in costs that could result if manufacturers made better use of their
water resources.
The first table used basic industrial water use per employee data as re-
ported by the Census of Manufactures for the year 1968. The waste treat-
ment costs are calculated on the basis that there be no change in water use
practices as a result of waste treatment.
The second table used altered industrial water use per employee data to •
calculate costs. For each SIC group, the highest (least efficient) regional
unit water use value was converted to equal the second highest regional
value. The waste treatment costs calculated reflect change that would
occur if the least efficient water users in each SIC group would lower
their water use to the level of the immediately preceding region in terms
of efficiency.
The third table presents calculated waste treatment costs on the basis of
median efficiency for each SIC group. All regional values higher than this
median were made equal to it. The resulting costs show change that would
occur if all regional water users presently exceedingly the median value
were to decrease water use per employee to the median value for each SIC
code.
The fourth table presents costs calculated on the basis that for each
SIC code all regional unit water use values that exceeded the most effici-
ent third were made equal to the value of the least efficient region in
the most efficient third.
The fifth table presents costs calculated using the most efficient regional
unit water use value in each SIC group for all the regions in the group.
94
-------
TOT»L NUMBFR OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FLDW AT OBSERVED 1968 LEVEL
1968 FLOW CONDFTIONS ( 1967 DOLISPSI
MANUFACTURING EMPl OYffNT
FLOW «MGY)
TOT4L CAPITAL COST
TOTAL ANNUAL CGM COST
TOTAL ANNUAL COST
38000,
469987.
1007?73S84.
13023192.
140946944.
MINIMUM
3.
0.
1721.
20.
238.
AVFRAGt
59?.
706.
61B567.
41399.
120058.
TOTAL
8590589.
10231149.
8965709824.
600250880.
1740715776.
S.O.
1452.
56?5.
8950119.
219798.
1308847.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
600?50880.
448285440.
690359296.
TOTAL
1738895616.
CO
COST RANGE
> 500000.
tOOOOO. TO
•^0000. TO
10000. TO
0. TO
500000.
100000.
50000.
I 0000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
MAX
933376.
»VE 2242.
TOT 2383110.
SO 29548.
5127 .
r.
29.
281195.
117.
CISTR
KHXIMUM
13023192.
499543.
99775.
49874.
9997.
IBUTI9N OF OPERATION
MINIMUM
501852.
100263.
50012.
10001 .
20 .
AND MAINTENANCE COST
WER4GF
13^9344 .
206900.
69816 .
21146.
49^R.
TOT4L
240083248.
1 5186452ft.
56690896.
104927408.
38578160.
S.D.
1369809.
95997.
13858.
10158.
251?.
NUMBER
178.
734.
812.
496^.
7813.
3ISTRIBUTI3N OF INVESTMENT REQUIREMENTS
MAXIMUM
1708778576.
4978156.
999680.
499976.
99997.
DISTRIBUTION
*3* *4*
11186. 38936.
0. 0.
155. 107.
1379825. I 106432.
348. 750.
MINIMUM
50? 9778.
100 1932.
500294.
100027.
2066.
AVERAGE
24839360.
2018998.
695255.
217541 .
63882.
TOT4L
5663375360.
2230992896.
911479808.
1717704960.
?S2906976.
S.D.
82186896.
989485.
138033.
99975.
22713.
NUMBEP
228.
1105.
1311.
7896.
3959.
OF TOTAL CAPITAL CCST (-OR TREATMENT it 1000)
*5* *6*
765. 8209.
3 . 0.
27. 210.
41997. 1351890.
41. 37;-.
*7* *8*
83. 17836.
0 . 4 ..
V, . 1 66 .
4114. 1399425. I
11 . 466 .
*9* *10*
44. 16948.
0. 0.
3. 5967.
3376. 125315.
4. 4130.
*11* *12*
16679. 26321.
C . 0.
6632. 2796.
245402. 645776.
3516. 4474.
*2*
*3*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS it 1000)
*4* * 5* * 6* *7* * 8* *9*
*10*
*U*
#12*
MAX
MIN
AVE
TOT
SO
1458.
P.
45.
47818.
122.
76.
0 .
I .
10291 .
2.
4390.
0.
24.
215687.
126.
1390.
0.
7.
73607.
32.
3944.
0.
2' .
34313.
130.
2045.
0.
18.
117908.
62.
16.
0.
3.
287.
3.
2459.
0.
6.
50474.
35.
30.
0.
1.
3431 .
2.
21.
0.
9.
197.
5.
1735.
0 .
626.
23177.
348.
911.
0.
103.
23829.
154.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* N4TION4L TOT4LS *
FLOW OF LEAST EFFICIENT WATER USE REGION MODIFIED
1^68 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF M4NUF4CTUPING PLUNTS...
CO
en
FLOW (MGV)
TOTAL CAPITAL COST
TDTAL ANNUAL OEM
TOTAL ANNUAL COST
COST RANGF
> 500000.
100000. TO
50000. TO
I 0000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO
0. TO
*l*
UX 127753.
* IN 0 .
AVF 1239.
TOT 1316831.
SO 7697.
MAXIMUM
EMPLOYMFNT 38000.
COST
tGM COST
OST
0000.
10000.
0000.
0300.
174719.
15412C048.
6808742.
25927248.
GSM
5559G6560.
DISTR
NAX1MUM
6R0874?.
'•09543.
99775.
49998.
9997.
MINIMUM
3.
0.
172!.
20.
238.
ANNUAL COST C1F WASTE
REPLACEMENT
378673 152.
4VER4GE
592.
620.
522344.
38341.
104781.
TREATMENT
INTFRFST
58315648C.
TOT4L
8590589.
8985124.
7573467136.
555906560.
1519222528.
TOT4L
1517736192.
S.O.
1452.
3725.
3149757.
182050.
571634.
I9UTION OF OPERATION AND MAINTENANCE CTST
MINIMUM
501R52 .
100261.
50012.
t 0001 .
20.
AVERAGE
13?05T6.
207032.
69740.
21125.
49'. 0.
TOTAL
207324304.
15071 9040.
54397008.
105561840 .
3*712704.
S.O.
1084478.
96800.
1 39 5(i .
10164.
2511 .
NUMBER
157.
728.
780.
4997.
7837.
DISTRIBUTION OF INVESTMENT RHQJIREMENTS
0000.
0000.
10000.
0000.
*2*
4064.
3.
2fl.
263550 .
99.
MAXIMUM
192650048.
4989713.
999361 .
499478.
99979.
DISTRIBUTION
*3* *4*
8050. 21509.
0 , 0 .
146. 96 .
1323793. S88797.
313. 601.
MINIM UM
5027460 .
lO'i 1374.
500009.
100083.
2152.
OF TOTAL CHPIT4L CCST
*"5* *6*
490. 8209.
3. 0.
25. 206.
39556. 1327796.
31. 359.
AVERAGE
1H7?4880.
] 9^9746 .
69 32 I 8 .
21 9590 .
64382.
FOR TRE4TMEMT ( t 1000
* 7* * 8*
83 . 94 66 .
0. 4.
38. 158.
4070. 1328130. 1
10. ^ 90.
TOTAL
428-3000512.
2259713280 .
022673152.
1771652608.
240852304.
I
*9* *io*
43. 16948.
0. 0.
3. 5867.
3226. 123198.
4. 4031.
S.D.
25138864.
964615,
139285.
100192.
22616.
*U* *12*
14642. 26321.
0 . 0.
6365. 2681.
235504. 619354.
3265. 4285.
NUM BER
229.
1130.
1331.
806 H.
3741.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS I* 1000)
*3* *4* *5* *6* *7* *8*
*10*
*ll*
*12*
MAX
1VF
TOT
SO
1363.
0.
41 .
44O24.
Ill .
59.
0.
1 .
10008.
2.
4390 .
0.
23.
200883.
117.
813.
0.
7.
68202.
27.
1746.
0.
16.
2551 1.
70.
2045.
0.
I'" .
114125.
58.
16.
0 ,
3.
270.
? •
829.
0 .
5.
45084.
20.
25.
0 .
I .
VI 57.
? .
21.
0.
9.
195.
5.
1528.
0.
600 .
2 2 1 86 .
116.
881.
0.
99.
22844.
147.
REPRESENTS ST^ND^RD OFVI*TION.
THE DM-% DISTRIBUTION USED IS HIGHLY SKEWED.
-------
« NATIONAL TOTALS *
FLOW LESS THAN 3R EQUAL TO MEDIAN OF WATfR USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 14499
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
38000.
81468.
67004336.
3B13776.
10486918.
MINIMU"
3.
0.
1731.
20.
238.
WERAGE
592.
460.
411355.
30564.
H2886.
TOTAL
8590589.
6674736.
5964230656.
443147776.
1201764352.
S.D.
1452.
2423.
1860742.
132981.
361306.
OEM
443147776.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
298211328.
45924531?.
TOTAL
1200604416.
COST RANGF
> 500000.
100000. TC
50000. TO
10000. TP
0. TO
DISTRIBUTION OF TPERATICN AND MAINTENANCF COST
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*?*
MAX
MIN
AVE
TOT
SO
MAXIMUM
3813776.
490134.
99528.
49985.
9997.
MAXIMUM
80405184.
4987889.
998888.
499976.
99997.
MINIMUM
504294.
100160.
50024.
1000 I .
20.
AVERAGE
U67878.
19^022.
69933.
•0412.
4831 .
DISTRIBUTION OF INVESTMENT RtQUIRFMENTS
MINIMUM
5029778.
1002542 .
500294.
100027.
2066.
WERAGE
14707182.
1985229.
704651.
212807.
64268.
TOTAL
143649088.
121337696.
46575184.
90444240.
41834240.
TOTSL
2588464128.
1907805440.
751862528.
1622016512.
300326656.
DISTRIBUTION OF TOTAL CAPITAL COST f-OR TREATMENT ($ 1000)
*3*
*4*
37601.
0.
680.
723159.
3339.
4064 .
0.
23 .
219882.
82.
5265.
0.
126.
1128432.
255.
21509
0
71
733697
417
412.
3.
23.
35927.
25.
*6*
82 C9.
0.
184.
1 184944,
308.
*7*
81.
0.
36.
3847.
8.
*8*
6869.
4 .
137.
1151209.
304 .
S.D.
742934.
91557.
13992.
9926.
2450.
S.D.
13548046.
952828.
141928.
99018.
22591.
NUMBER
123.
619.
666.
4431.
8660.
NUMBER
176.
961.
1067.
7622.
4673.
35.
0.
3.
11065.
3 .
*10*
*11*
*12*
10781.
0.
4173.
87640.
2591.
9668 .
0.
49 19.
182020.
2146.
26321.
0.
2213.
511156.
3563.
MAX
MIN
AVE
TOT
SD
797.
0.
33.
35539.
83.
50.
0 .
I.
8936 .
2.
24?8.
".
18.
156271.
85.
DISTRIBUTION OF ANN'J AL 06M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* * 8* *9*
695.
0.
5.
52633.
20.
1207.
0.
12.
19393.
47.
2045.
0.
15.
94582.
47.
0.
2.
225.
484.
0.
4 .
37126 .
13.
18.
0.
1 .
2562.
1.
*10*
15.
0.
7.
151.
4.
*11*
1019.
0.
467.
17291.
210.
*12*
881.
0.
82.
19013.
122.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED
-------
* MAT ICNAL TOTALS *
FLOW OF LFAST EFFICIENT TKO-THIROS OF HATER USE REGIONS MODIFIED
1968 FL3W CONDITIONS < l<567 DOLLARS!
TUTAL NUMBER OF MANUFACTURING PUNTS... 14499
MANUF^TUR ING EMPLOYMENT
FL OW ( Mf.Y I
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAl COST
MAXIMUM
38000.
65893.
647263B4.
31C1819.
10090902.
MINIMUM
0.
1721.
20.
238.
AVFKAGE
'."'92.
348.
334083.
24207.
66683.
TOTAL
8590589.
5043972.
4843876352.
350978560.
966842880.
S.D.
1452.
1734.
1350181.
100533.
265297.
JEM
350978560.
ANNUAl COST OF hASTE
REPLACEMENT
242193752.
TREATMENT
iMTf REST
372978176.
TOTM
966150400.
DISTRIBUTION OF OPERAIICfv AND MAINTENANCE CCST
CD
OS
COST RANGE
> 500000.
100000. TH
50000. TO
10000. TO
0. TO
500000.
I 00000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TP 1000000.
100000. TO 500000.
0. TO 100000.
*t*
MAX
MIN
*ve
TOT
sn
*2*
MAXIMUM
3101819.
491766.
99984.
49969.
99<37.
MAXIMUM
80907968.
4P95670.
999554.
499571.
99968.
M IN ! M UM
503414.
100382.
50005.
10012.
20.
AVERAGE
1021593.
194264.
70816.
20258.
4590.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MIN IM UM
5D2746C .
1001477.
50023B.
100019 .
2152.
AVERAGE
12746127.
70 2051.
208021 .
63323.
TOTAl
96029776.
95189136.
39373952.
77060736.
43857472.
TOTAL
184H188416.
1683299584.
700646656.
14983?3120.
335229952.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
*4* *5* *6* *7* *8* *9*
S .0.
561087.
91860.
14194.
S921.
2421.
S.D.
10328541.
914512.
142496.
97919.
22446.
352*06.
0.
394.
418684.
2015.
3469 .
0.
1°.
176812.
66.
4450.
0.
105.
939699.
203.
17450.
0.
54.
561832.
320.
276.
3.
20.
30578.
19.
72 S9.
0.
166.
1067108.
275.
73.
0.
34.
3612.
7.
5269.
4.
1 1- .
991527.
250.
28.
0.
2.
9193.
2.
*10*
8653.
0.
3427.
7(963.
2023.
*11*
8508.
0.
4222.
156217.
1S31.
NUMBER
94.
490.
556.
3804.
9555.
NUMBER
145.
859.
99b.
7203.
5294.
*12*
25800.
0.
1832.
423120.
2914.
MAX
MIN
-------
* NATIONAL TOTALS *
FLOW OF MOST EFFICIENT WATER USE RFGION USED THROUGHOUT
1968 FlOW CONDITIONS I 1967 DOLLARS)
TOT4L NUMBFR OF MANUFACTURING PLANTS... 14499
MANUFACTURING EMPLOYMFNT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAl OEM COST
TOTAL ANNUAL COST
MHXIMUM
38000.
39050.
21 >S4304.
1665295.
4458571.
MINIMUM
3.
0.
1489.
19.
209.
AVCRAGf
•592.
189.
214934.
14265.
41505.
TOTAL
85V0589.
2740738.
3116322560.
206828784.
601775616.
S.O.
1452.
852.
634135.
48723.
126860.
OEM
206828784.
ANNUAL COST OF WASTE
RFPLACEMENT
155816112.
TP EATMEMT
INTEPFST
239956704.
TOTAL
602601216.
COST RANGF
> 500000.
100000. TP
50000. TO
10000. TP
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCf COST
500000.
100000.
50000.
10000.
(£> COST RAMGF
> 5000000.
1000000. TO 5000000.
5000CO. TO 1000000.
100000. TO 500000.
0. TO 100000.
499293.
•^9358.
498C2.
9998.
"AXIMUM
27492880.
4^76046.
99R619.
499952.
99986.
MINIMUM
508166.
111221
50071
1000,'
19
4VSUGE
753271 .
202037.
69358.
20572.
3880.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
512803?.
1002204.
530607 .
100019.
186L.
AVB'AGE
9341816.
1850686.
689796.
216490.
57736.
TOTAL
24857936.
51317376.
28644784.
59760672.
42268624.
TOTAL
597876224,
1069697024.
S94604037.
1205200384.
4288'>4000.
S.D.
249926.
99712.
14427.
10042.
2356.
S.D.
4681241.
887512.
136974.
103200.
22555.
NUMBER
33.
25'..
413.
290^.
10«94.
NUMBER
64.
578.
862.
5567.
7428.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ IOOC I
MIN
»VF
TOT
SO
6734.
0.
96 .
10172R.
366.
2347 ,
n.
12.
114281.
22 10 .
r.
70.
627068.
112.
*4*
10419.
0.
29.
303043.
174.
*5*
217.
2.
17.
26357.
16.
*6*
5464.
0.
131.
84 I 16 I.
202.
*7*
67.
0.
31.
3339.
*8*
3775.
3.
89 .
751785.
171.
*10*
* 11*
*12*
25.
0.
2 .
7451.
3288.
0.
1468.
30825.
718.
7048 .
u .
2731.
10 10 4«.
1291.
t 1793.
0.
898.
207455.
1347.
MAX
MIN
AVE
TOT
SO
*1*
267.
0.
U.
12204.
26.
*2*
28.
0 .
I .
6245.
1 .
*3*
738.
0 .
7.
59027.
24.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS (t 1000)
*4* *5* *6* *7* *8*
359.
0.
2.
22887.
8.
37 f).
0.
6.
9631.
17.
1116.
0.
9.
54750.
25.
R.
0.
2.
163.
I.
162.
0.
3.
22642.
5.
9.
••>.
n.
1469.
t .
6.
0.
3.
*L1»
604.
0 .
263.
9727.
123.
*12*
403.
0.
34.
7966.
48.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWEP
-------
STATE SUMMARIES FOR MANUFACTURING
101
-------
State Summaries for Manufacturing
Each table summarizes manufacturers, as a group, and includes all SIC
categories within the State. For each State costs are presented in
terms of three efficiency levels: (1) water use as reported in 1968,
(2) median efficiency, and (3) with regional values below the efficiency
of the most efficient third made equal to the least efficient region in
the most efficient third.
102
-------
TPTAL NUMBER OF MANUFACTURING PI ANTS...
fl|_ Afi AM A
FLOW AT neSFRVEC 1968 LF.VFL
[961 FLOW CONDITIONS ( 1967 DOLLARS)
258
MAX
MANUFACTURING EMPLOYMENT
HP'/ ("GY1
TOTAL CAPITAL COST
TPTAL ANNUAL Ctf CO5 T
TPTAL ANNUAL CCST
4200.
4L 100.
12
MINIMUM
7.
e.
22520.
1208.
AVERAGE
475.
841.
441661.
36281.
92370.
TOTAL
122550.
216977.
113948640.
9360508.
23831488.
S.D.
627.
3631.
1213673.
106401.
258158.
ANNUAL COST OF ViASTE
EM REPLACEMENT
936050R. "697«3l.
TREATMENT
INTEREST
877404C.
TOTAL
23831968.
O
CO
CPST RANGE
> 5cr>con.
110000. TP
50POC. TP
10000. TO
0. TP
DISTRIBUTION OF TPFRATICN AND MAINTENANCE CCST
500010.
tCOPOp.
SOODP.
10000,
COST RANfF
> 500CC10.
1000000. TO 5000000.
500000. TP I 000000.
tooooo. TO srcooo.
". TP 100000.
MIN
AVE
TOT
SD
0 .
I MUM
< 97214.
435211.
973<52.
9970.
WIN IMUM
5.92287,
101952.
54291 ,
10023.
1208.
AVERAGF
743710.
21 150H.
68891.
20445.
5229.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
471C?32.
9043^6.
499217.
M I N I M UM
51?5247.
1072711.
100556.
2B16C.
AVERAGE
9671692.
211339« .
f75995.
210225.
72893.
DISTRIBUTION OF TOT iL CSPITU CCST FCR TREATMENT (J 1000)
*<*
*7*
* 8*
TOTAL
2974841,
3384128,
551131.
1676520,
773934.
TOTAL
48358464.
46*94768.
1013-5932.
33215536.
4228075.
210.
?42.
I .
->] .
3?3P .
43 .
U«3.
v1 •
12P.
1 79P3.
167 .
3376.
0.
104.
2C! 56.
397.
68.
9.
19.
744.
10.
32 10.
0.
271 .
31466.
SO1* .
34.
0.
32 .
55.
2.
3169 .
11.
184.
29808 .
427.
7.
0.
3.
183.
1.
*10*
0.
0.
c.
0.
c.
S.D.
186309.
93864.
14420.
8738.
2346.
S.D.
4034807.
1054203.
111979.
94113.
20914.
*11*
4654.
0.
4654.
4654.
0.
NUMBER
4.
16.
8.
82.
148.
NUMBER
5.
22.
15.
158.
58.
860.
0.
659.
1978.
200.
MAX
M IN
AVF
TOT
SD
1 07.
0.
6 .
O .
1 .
127.
1 .
*3*
DISTRIBUTION DK ANNUAL C£F TREATMENT CCSTS ($ 1000)
*4* * 5* #6* *7* *8*
?77 .
C.
JS .
2U3.
34.
166.
0.
A .
1251 .
19.
3v .
2.
6.
231 .
6.
661
0
20
3462
8H
2.
0.
2.
5.
0.
171,
I ,
6.
1038.
19 ,
1.
0.
0.
33.
0 .
*10*
c.
0.
0.
c.
0.
*11*
418.
0.
418.
418.
0.
*12*
30.
0.
23.
70.
7.
SD HR S.n. RFPRFSEMS ST4TVH' PFVMTlCN. THF CAT* DI STR I BIT ICN UStC IS HIOHIY SKEWED.
-------
ALABAMA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
_„-_ -._-,.„_-, 19&8 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 258
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
"4200.
21559.
7751773.
57H123.
1463921.
MINIMUM
7.
5.
16364.
881.
2959.
AVERAGE
475.
537.
353155.
27668.
72518.
TOTAL
122550.
138650.
91113872.
7138458.
18709600.
S.D.
627.
1947.
813803.
70865.
172078.
OSM
7138458.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
4555693.
7015764.
TOTAL
18709904.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
574123.
479447.
87961.
47244.
9970.
MAXIMUM
9689716.
4884566.
914969.
498866.
98978.
MINIMUM
574123.
107207.
54291.
10157.
881.
AVERAGE
574123.
235291.
69630.
19503.
5076.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5195718. 7485648.
1027821. 2055845.
508249. 686062.
100556. 195770.
20455. 68989.
TOTAL
574123.
3764659.
626667.
1345678.
827381.
TOTAL
22456944.
47284448.
10290932.
29169664.
4691243.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
1038.
0.
129.
3605.
210.
342.
1.
20.
3068.
43.
1183.
0.
115.
16151.
164.
1787.
0.
67.
13049.
220.
60.
8.
17.
693.
9.
2246.
0.
221.
25654.
360.
33.
0.
31.
94.
2.
2093.
11,
146.
23593.
283.
6.
0.
2.
156.
1.
*10*
0.
0.
0.
0.
0.
S.D.
0.
113183.
12257.
8035.
2406.
S.D.
2248251.
1093507.
136130.
86483.
21975.
NUMBER
1.
16.
9.
69.
163.
NUMBER
3.
23.
15.
149.
68.
+ 11*
3073.
0.
3073.
3073.
0.
*12*
860.
0.
659.
1978.
200.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*<»* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
107.
0.
20.
560.
25.
6.
0.
1.
122.
1.
277.
0.
14.
1922.
34.
93.
0.
5.
889.
11.
31.
1.
5.
204.
5.
388
0
20
2326
52
2.
0.
1.
4.
0.
93.
1.
5.
736.
10.
1.
0.
0.
26.
0.
*10*
0.
0.
0.
0.
0.
*11*
279.
0.
279.
279.
0.
*12*
30.
0.
23.
70.
7.
SD
OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
ALABAMA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 258
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
j^, COST RANGE
O > 5000000.
V\ 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000,
MAX
MIN
AVE
TOT
SD
*1*
613.
0.
85.
2366.
131.
*2*
291.
1.
15.
2358.
35.
MAXIMUM
4200.
16190.
6335472.
450110.
1194804.
OSM
5503461.
MINIMUM
7.
4.
14127.
752.
2547.
ANNUAL COST OF WASTE
REPLACEMENT
3701836.
AVERAGE
475.
397.
286968.
21331.
57777.
TREATMENT
INTEREST
5700903.
TOTAL
122550.
102539.
74037744.
5503461.
14906386.
TOTAL
14906250
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
0.
450110.
88891.
46763.
9997,
MINIMUM
0.
101472.
62921.
10368.
752.
AVERAGE
0.
212482.
74274.
19947.
4716.
TOTAL
0.
3187235.
371372.
1077117.
867794.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
7919340.
4268518.
993066.
483692.
99495.
DISTRIBUTION
*3* *ij*
951. 1348.
0. 0.
91. 50.
12736. 9660.
132. 166.
MINIMUM
6191507.
1055070.
507646.
100372.
17658.
OF TOTAL CAPITAL COST
*5* *6*
40. 1917.
6. 0.
15. 192.
581. 22315.
6. 307.
AVERAGE
7055423.
2100459.
672661.
188127.
66438.
FOR TREATMENT ($ 1000)
*7* *8*
30. 1741.
0. 10.
28. 122.
85. 19767.
2. 235.
TOTAL
14110847.
35707808.
12780558.
23703984.
6245132.
*9* *10*
6. 0.
0. 0.
2. 0.
127. 0.
1. 0.
S.D.
627.
1458.
660062.
55082.
137278.
S.D. NUMBER
0. 0.
106693. 15.
11554. 5.
10420. 54.
2438. 184.
S.D. NUMBER
1221755. 2.
1036367. 17.
149778. 19.
89284. 126.
21437. 94.
*11* *12*
2556. 647.
0. 0.
2556. 496.
2556. 1487.
0. 150.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*H* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
81.
0.
15.
418.
19.
5.
0.
1.
105.
1.
203.
0.
10.
1385.
25.
72.
0.
3.
669.
9.
15.
1.
4.
144.
3.
307.
0.
16.
1870.
41.
1.
0,
1.
4.
0.
72.
1.
4.
603.
1.
0.
0.
20.
0.
*10*
0.
0.
0.
0.
0.
233.
0.
233.
233.
0.
*12*
23.
0.
18.
53.
5.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS..,
1968
IS
ALASKA
FlOW IT OBSERVEC 1968 LEVEL
t-LDH CONDITIONS ( 1967 OCLLARS)
MANUFACTURING EMPLOYMENT
FL TW (MGY>
TOTAL CAPITAL COST
TOTM \NNU4L ORM COST
TPTAL ANNUAL COST
(•"AX
750.
16666.
13323295.
1236C36.
2923996.
MINIMUM
AVERAGE
30.
ie.
4AQ68.
?P56.
8C7.
259.
3062.
2654571.
238364.
575994.
TOTAL
3888.
45937.
39818576.
3582953.
8639915.
S.O.
228.
6169.
4973863.
464965.
1096627.
GEM
ANNUAL COST (IF I»ASTE TREATMENT
REPLACEMENT INTEREST
3562953.
199CC28.
3066028.
TOTAL
8639909.
DISTRIBLTION OF HPFRUICN AND NAINTENANCE CCST
o
OS
COST
> 5COCOC.
loooco. TO
500CP. TO
10000. TO
0 . TT
500000.
100000.
5ooor.
10000.
COST PANGF
> 5000000.
lOOOOCi. TO 5CCOOOO.
500000. TO 1000000.
1000^0. TO 5rooor.
0. TO
MAX
MIN1
AVF
TOT
sn
*1*
0.
C.
C.
0.
0 .
*2*
2°.
O .
19.
190.
6 ,
MAXIMUM
1? »6938.
0.
0.
747C7.
2956.
PA XI^UM
16654118.
0.
52l3Cf>.
44 1343.
575E5.
MINIMUM
904776
0.
0
1 48 31
2956.
AVERAGE
1126217.
0 .
0.
18304.
2956 ,
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MI NIM U«
12245500.
0.
5213CS.
208678.
57585.
AVERAGE
15184576.
0 .
521308.
3465Q2,
57585.
TOTAL
3378652.
0.
0.
201346.
2956.
TOTAL
45553728.
0.
1042615.
3119331.
57585.
riSTRIBUTICN UF TOTAL CAPITAL CCST FOR TREATMENT !$ 1000)
*4* *5* *£* *7* *8* *9*
S.D.
191773.
0.
0.
4326.
0.
S.D.
2545327.
0.
256.
63208.
0.
NUMBER
3.
C.
0.
11.
I.
NUMBER
3.
0.
2.
9.
1.
145.
27.
171.
83.
3542.
0.
9447.
1776.
0.
n.
0.
0.
0.
1^66 .
0.
55?.
7176.
734.
0 .
0.
0.
0 .
0.
2726
19
628
8796
1030
*10*
*lt*
*12*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
5C69.
0.
4679.
14037.
710 .
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SO
r> .
n.
0.
r>.
o.
n.
i .
13 .
1° .
21 .
I? .
OISTRIRUTICN OF ANN'IAL
0.
0.
0.
0.
CCSTS ($ 10001
164.
0.
44'> ,
HI.
0.
66.
862.
106,
0.
0.
0.
0.
0 .
I 13.
1 .
25.
353.
0.
0.
0 .
0.
0.
*10*
0.
0.
0.
0.
C.
*ll*
683.
0.
629.
1888.
93.
*12*
0.
0.
0.
0.
0.
sn
REPRESENTS STANT&Pn Ct-VIATICN. Tt-e DATA DISTRIPUTICN USFC IS HIGHLY SKEWED.
-------
ALASKA
PLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 15
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
750.
16666.
13323295.
1236938.
2928996.
MINIMUM
30.
14.
38258.
2419.
7278.
AVERAGE
259.
3027.
2609U32.
235824.
567222.
TOTAL
3888.
45405.
39141488.
3537358.
8508331.
S.D.
228.
6187.
4996598.
466510.
1101063.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
3537358.
1957074.
3013893.
TOTAL
8508325.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAX
MIN
AVE
TOT
SD
*2*
MAXIMUM
1236938.
0.
0.
22755.
2419.
MAXIMUM
16654118.
0.
0.
421304.
47822.
MINIMUM
904776.
0.
0.
11525.
2419.
AVERAGE
1126217.
0.
0.
14208.
2419.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
12245500.
0.
0.
208678.
47822.
AVERAGE
15184576.
0.
0.
302305.
47822.
TOTAL
3378652.
0.
0.
156288.
2419.
TOTAL
45553728.
0.
0.
3325354.
47822.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
22.
0.
15.
148.
4.
145,
22.
83.
167.
87.
3542.
0.
1886.
9431.
1780.
0.
0.
0.
0.
0.
1966.
0.
527.
6845.
748.
0.
0.
0.
0.
0.
2726.
16.
608.
8513.
1040.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
191773.
0.
0.
4076.
0.
S.D.
2545327.
0.
0.
64883.
0.
NUMBER
3.
0.
0.
11.
1.
NUMBER
3.
0.
0.
11.
1.
5089.
0.
4679.
14037.
710.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
1.
0.
1.
11.
0.
19.
1.
10.
20.
13.
164.
0.
89.
444.
82.
0.
0.
0.
0.
0.
276.
0.
64.
831.
107.
0.
0.
0.
0.
0.
113.
1.
25.
343.
42.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
683.
0.
629.
1888.
93.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
ALASKA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 15
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
750.
12743.
10989085.
1017048.
2412660.
MINIMUM
30.
11.
32930.
2069.
6251.
AVERAGE
259.
2313.
2159589.
193712.
U67980.
TOTAL
3888.
34701.
323938UO.
2905673.
7019693.
S.D.
228.
4731.
H120781.
383894.
907224.
OSM
2905673.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1619691.
2494324.
TOTAL
7019688.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
M COST RANGE
O > 5000000.
GO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000,
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
0.
0.
0.
0.
0.
*2*
19.
0.
12.
121.
4.
MAXIMUM
1017048.
0.
0.
16026.
9793.
MAXIMUM
13736356.
0.
0.
366220.
41162.
MINIMUM
745569.
0.
0.
11980.
2069.
AVERAGE
926554.
0.
0.
14067.
8718.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
10129138.
0.
0.
103058.
41162.
AVERAGE
12533946.
0.
0.
259031.
41162.
TOTAL
2779663.
0.
0.
56267.
69742.
TOTAL
37601840.
0.
0.
2849338.
41162.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
74.
19.
47.
93.
39.
2718.
0.
1447.
7236.
1367.
0.
0.
0.
0.
0.
1695.
0.
457.
5938.
643.
0.
0.
0.
0.
0.
2294.
14.
514.
7195.
874.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
156742.
0.
0.
2264.
2704.
S.D.
2082638.
0.
0.
70894.
0.
NUMBER
3.
0.
0.
4.
8.
NUMBER
3.
0.
0.
11.
1.
*11*
4282.
0.
3937.
11811.
597.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
0.
0.
0.
0.
0.
*2*
1.
0.
1.
10.
0.
*3*
7.
1 .
4.
8.
4.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
129.
0.
70.
348.
65.
0.
0.
0.
0.
0.
222.
0.
51.
669.
86.
0.
0.
0.
0.
0.
89.
1.
20.
275.
33.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
577.
0.
532.
1595.
79.
*12*
0.
6.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL MII*fl6R CF MANUFACTURING PLANTS...
FLOW
1968 FLOW
58
ARIZCNA
AT OBSERVED 1968 LEVEL
CONDITIONS ( 1967 OCLLARS)
HANUFACTURING EMPLOYMENT
FLOW (MGYI
TOTAL CAPITAL COST
TOTAL ANNUAL 0£M COST
TPTIVL UNN'UL COST
MAXIMUM
12000.
3758.
1995972.
191160.
413511.
MINIMUM
20.
7.
23954.
1500.
4542.
AVERAGE
730.
470.
356826.
32396.
77713.
TOTAL
42341.
27254.
20695904.
1878954.
4507344.
S.O.
1718.
721.
387476.
46569.
93261.
4NNUHL COST OF WSSTE
06M REPLACEMENT
1878954. 1034795.
TREATMENT
INTEREST
1593583.
TOTAL
4507332.
DISTRIBUTION OF OPERATION AND MMNTEN4NCE COST
COST R&NGE
> 501000.
100000. TO
50000. TO
trooo. TO
0. TO
5COOOO.
1000 00.
50000.
10000.
COST
> 5000000.
ICOOOCC. TO 5COOOOC.
5000CO. TO 1COOOOO.
100000. TC 500000.
0. TO 100000.
MAX
MIN
AVF
TOT
SO
MAXIMUM
0.
191160.
80702.
47104.
990^.
PIVXI MUM
o.
24Q4965.
86S362.
483535.
94601.
MINIMUM
0.
147976.
"51593.
10662.
1500.
AVERAGE
0.
170667.
61767 .
23249.
5106.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
c.
103H74.
526715.
IOS851.
29942.
IWERAGE
0.
1371291.
699343.
252409.
66635.
TOTAL
0.
853335.
308836.
604469.
112323.
TOTAL
0.
12341624.
5594742.
7067441.
866255.
DISTRIBUTION OF TOTAL CAPITAL COST FCR TREATMENT ($ 1000)
* 3* */»# *5* *6* *7* *8* *9*
0.
0.
0 .
0.
0.
17".
?.
35 .
1077.
54.
727.
0.
170.
5778.
2C7.
339.
0.
62.
2851 .
95.
34.
15.
25.
50.
13.
925.
0.
24C.
5999 .
190.
0.
0.
0.
0.
0.
738.
18 .
163.
4898.
145.
11.
0.
3.
43.
3.
*10*
C.
0.
0.
0.
0.
S.O.
0.
16948.
13424.
11238.
2403.
S.O.
0.
473890.
97905.
115797.
23319.
NUMBER
0.
5.
5.
26.
22.
NUMBER
0.
9.
8.
28.
13.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
M &X
MIN
AVE
TOT
DISTRIBUTION OF 4NNU»L CGM TPE«TMEKT COSTS <$ 1000)
* 7* * 8* * 9*
*
".
0.
C.
0 .
p.
*?*
5.
n .
1 .
43 .
I .
*3*
150.
0.
26.
868.
43 .
*4*
36.
0.
ft.
2<33.
9.
*5*
15.
4.
9.
19.
8.
*t*
1 12
0
19
467
22
0.
0.
0 .
0.
0.
25.
I .
5 .
158 .
5.
4.
0.
1.
11 .
1.
*10*
0.
0.
c.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OP. S.D. REPRESENTS STAND/IRC CEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
ARIZONA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
TOTAL NUMBER OF MANUFACTURE PLANTS... 1? "^ C°NDI™S < ^ DOLLARS>
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
12000.
3090.
1755300.
191160.
359007.
MINIMUM
20.
7.
23954.
1500.
4542.
AVERAGE
730.
372.
292937.
27400.
64603.
TOTAL
42341.
21560.
16990320.
1589206.
3746970.
S.D.
1718.
672.
361683.
46154.
90080.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
•5589206.
849516.
1308253.
TOTAL
3746974.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
.DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
*2*
MAXIMUM ' '
0.
191160.
80702.
45795.
9828.
MAXIMUM
0.
2194125.
936646.
483'935.
97759.
MINIMUM
0.
136084.
71257.
10701.
1500.
AVERAGE
0.
165867.
75980.
22356.
5187.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1256486.
526372.
109851.
29942.
AVERAGE
0.
1584938.
718481.
200805.
68237.
TOTAL
0.
829336.
151959.
447115.
160802.
TOTAL
0.
7924693.
6466330.
5823347.
1023548.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *(j* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
179.
2.
33.
1034.
54.
727.
0.
163.
5525.
209.
339.
0.
53.
2428.
92.
28.
12.
20.
40.
11.
830.
0.
178.
4459.
175.
0.
0.
0.
0.
0.
651.
13.
115.
3464.
129.
10.
0.
3.
40.
3.
*10*
0.
0.
0.
0.
0.
S.D.
0.
23010.
6679.
11970.
2220.
S.D.
0.
357932.
162458.
94651.
23338.
NUMBER
0.
5.
2.
20.
31.
NUMBER
0.
5.
9.
29.
15.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS {$ 1000)
*4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
5.
0.
1.
42.
1.
150.
0.
25.
833.
44.
36.
0.
6.
255.
9.
10.
2.
6.
12.
5.
95
0
13
326
19
0.
0.
0.
0.
0.
21.
1.
4.
111.
4.
4.
0.
1.
10.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
ARIZONA
FIOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 58
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O&M COST
TOTAL ANNUAL COST
MAXIMUM
12000.
2451.
1456610.
191160.
349230.
MINIMUM
20.
7.
23954.
1500.
4542.
AVERAGE
730.
333.
269118.
25327.
59505.
TOTAL
42341.
19299.
15608844.
1468979.
3451296.
S.D.
1718.
621.
337424.
45233.
86343.
06M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1468979.
780442.
1201880.
TOTAL
3451301.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAX
MIN
AVE
TOT
SD
*1*
*2*
MAXIMUM
0.
191160.
80702.
38254.
9912.
MAXIMUM
0.
1820762.
782617.
484852.
98010.
MINIMUM
0.
107382.
71257.
11605.
1500.
AVERAGE
0.
160127.
75980.
20287.
5045.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1256486.
538501.
100317.
29942.
AVERAGE
0.
1510266.
696456.
203688.
69270.
TOTAL
0.
800634.
151959.
344871.
171521.
TOTAL
0.
7551330.
4875192.
5906948.
1177593.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *t(* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
179.
2.
32.
1002.
54.
727.
0.
156.
5294.
210.
339.
0.
49.
2262.
89.
24.
11.
17.
35.
9.
709
0
159
3977
149
0.
0.
0.
0.
0.
541.
11.
100.
3003.
108.
10.
0.
2.
37.
3.
*10*
0.
0.
0.
0.
0.
S.D.
0.
33491.
6679.
9749.
2265.
S.D.
0.
205600.
88846.
118607.
23378.
NUMBER
0.
5.
2.
17.
34.
NUMBER
0.
5.
7.
29.
17.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*U* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
5.
0.
1.
41.
1.
150.
0.
24.
802.
44.
36
0
5
240
9
8.
2.
5.
10.
4.
75.
0.
11.
271.
15.
0.
0.
0.
0.
0.
17.
1.
3.
96.
3.
4.
0.
1.
9.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
S0 OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS.
FLOW AT OBSERVED 196R LEVEL
1968 FLOW CnNDITIQNS ( 1967 DCLL4RS)
169
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOT4L CAPITAL COST
TOTAL ANNUAL C£M COST
TOTAL ANNUAL COST
MAXIMUM
32^0.
3805.
#-663733.
3605R4.
1206877.
MINIMU^
5.
7.
21172.
1039.
3728.
4VERAGE
330.
386.
317180.
L6324.
56606.
TOTAL
55794.
65269.
53603344.
2758834.
9566487.
S.D.
388.
1238.
778047.
42120.
137589.
ANNUAL COST OF WASTE
C16M REPLACEMENT
2/58834. 2680167.
TREATMENT
INTEREST
4127455.
TOTAL
9566456.
COST RANGE
> 500000.
100000. TC
50000. TO
10000. TO
0. TC
DISTRIBUTION OF flPERATICN AND MAINTENANCE CCST
500000.
ICCOOO.
50000.
I 0000.
COST RANGE
> 500COOO.
1000000. TO 5000000.
5000CO. TO IOCOOOO.
10COOO. TO 500000.
0. TO 100000.
*l*
NAXIfU*
C.
360584.
77117.
46769.
9458.
MAXIMUM
8329666.
4526692.
86125^.
4SC224.
99290.
MINIMUM
0.
10*823.
61495.
1C014.
1039.
1VERAGF
0 .
227288.
70582.
17971.
3950.
DISTRIBUTION CF INVESTMENT REQUIREMENTS
MINIMUM
5981928 .
1064313.
503597 .
10C702 .
26465.
AVERAGE
7155797.
2213473.
629863.
215388.
62325.
DISTRIBUTION OF TOTM. C4PIT4L CCST FCR TREATMENT ($ 1000)
TOTAL
0.
I 136442.
423494.
736831.
462096.
TOTAL
14311594.
24348208.
5038903.
19815664.
3490215.
s.o.
0.
93628.
5872.
10062.
2171 .
S.D.
166COS8.
1331026.
129001.
9S222.
20614.
NUMBER
0.
5.
6.
41.
117.
NUMBER
2.
11.
8.
92.
56.
*3*
*4*
*£*
*7*
*8*
*9*
*10*
*11*
*12*
MAX
MIN
4VE
TOT
SO
62^.
0.
103.
P30.
201.
230 .
t .
13.
1134.
27.
766 .
0 .
1C1.
6678.
141 .
1471.
0 .
53.
= 333.
175.
118.
5.
19.
620.
23.
1313.
0.
145.
130S2.
198 .
58.
0.
58.
58.
0.
1430 .
10.
106 .
13300.
201.
15.
0.
3.
121 .
2.
4019.
0.
3415.
6830.
855.
26t8.
0.
2668.
2668 .
0.
1186.
0.
710.
2840.
509.
MAX
M IN
AVE
TOT
SO
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS ($ 10001
*5* *fc* *7* *8* *9*
36.
0.
R.
75.
12.
3.
0.
1 .
45.
0 .
81.
0.
«5 .
600.
18.
4?.
0.
3.
305.
7.
100.
1.
9.
289.
24.
156.
0.
9.
776.
19.
5.
0.
5.
5.
0.
35.
0 .
3.
334 .
5 .
*10*
*u*
*12*
3.
0.
0.
19.
I .
5.
0.
5.
10.
1.
213.
0.
213.
213.
0.
36.
0.
22.
87.
15.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USEC IS HIGHLY SKEWED.
-------
ARKANSAS
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 169
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000, TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
309.
0.
68.
612.
102.
*2*
154.
1.
11.
966.
19.
MAXIMUM
3250.
8805.
6663733.
360584.
1206877.
OSM
2401120.
MINIMUM
5.
7.
21172.
1039.
3728.
ANNUAL COST OF WASTE
REPLACEMENT
2462523.
DISTRIBUTION OF OPERATION
MAXIMUM
0.
360584.
96023.
46457.
8950.
MINIMUM
0.
162774.
54176.
10014.
1039.
AVERAGE
330.
320.
291423.
14208.
51219.
TREATMENT
INTEREST
3792285.
AND MAINTENANCE COST
AVERAGE
0.
249954.
70821.
16817.
4034.
TOTAL
55794.
54108.
49250480.
2401120.
8655959.
TOTAL
8655928
TOTAL
0.
749863.
566564.
588587.
496134.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
8329666.
3905701.
861256.
468378.
98767.
DISTRIBUTION
*3* *lj*
546. 1471.
0. 0.
86. 45.
5666. 4592.
112. 166.
MINIMUM
5385775.
1086923.
503597.
101048.
26465.
AVERAGE
6857720.
2193818.
676124.
213571.
63089.
TOTAL
13715441.
19744368.
4732867.
19648560.
3722273.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
92. 1313.
5. 0.
17. 140.
548. 12560.
16. 195.
*7* *8*
41. 1430.
0. 10.
41. 99.
41. 12521.
0. 186.
*9* *10*
15. 3601.
0. 0.
3. 3060.
116. 6120.
2. 766.
S.D.
388.
1045.
723687.
36997.
126900.
S.D.
0.
100968.
12224.
8724.
2211.
S.D.
2081647.
1093*71.
133300.
97822.
20713.
NUMBER
0.
3.
8.
35.
123.
NUMBER
2.
9.
7.
92.
59.
*11*
2668.
0.
2668.
2668.
0.
*12*
1186.
0.
710.
2840.
509.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
23.
0.
7.
62.
9.
2.
0.
0.
43.
0.
73.
0.
7.
469.
14.
42.
0.
3.
261.
e.
62.
1.
6.
182.
12.
156.
0.
8.
741.
19.
2.
0.
2.
2.
0.
35.
0.
2.
314.
5.
3.
0.
0.
18.
1.
*10*
5.
0.
4.
9.
1.
*11*
213.
0.
213.
213.
0.
*12*
36.
0.
22.
87.
15.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
ARKANSAS
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
„,„_„ 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 169
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
3250.
7285.
5834057.
314775.
1055699.
MINIMUM
5.
6.
18647.
756.
3260.
AVERAGE
330.
257.
254028.
12024.
44286.
TOTAL
55794.
43457.
42930656.
2032074.
7484310.
S.D.
388.
835.
614155.
31050.
107561.
O6M
ANNUAL COST- OF WASTE TREATMENT
REPLACEMENT INTEREST
2032074.
2146532.
3305658.
TOTAL
7484264.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
,. COST RANGE
JH > 5000000.
tfS 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
0. 0. 0.
314775. 193197. 253986.
79053. 57642. 67436.
39799. 10136. 17403.
9751. 756. 3900.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
7292571.
4366876.
999554.
492303.
99693.
MINIMUM
7292571.
1366758.
595121.
100102.
23309.
AVERAGE
7292571.
2366596.
817243.
216024.
62702.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3*
*4*
123.
0.
46.
411.
52.
79.
1.
9.
791.
12.
439.
0.
72.
4778.
92.
1220
0
36
3680
136
*5*
62.
5.
15.
485.
12.
*6*
1182.
0.
128.
11486.
176.
*7*
*8*
TOTAL
0.
507972.
539491.
469880.
514761.
TOTAL
7292571.
18932768.
4903458.
18146032.
4389144.
*10*
S.D.
0.
85968.
8343.
9367.
2243.
S.D.
0.
1124189.
161030.
101423.
21533.
NUMBER
0.
2.
8.
27.
132.
NUMBER
1.
8.
6.
84.
70.
*11*
*12*
37.
0.
37.
37.
0.
1266.
8.
88.
11045.
158.
14.
0.
2.
105.
2.
2891.
0.
2456.
4912.
615.
2362.
0.
2362.
2362.
0.
1186.
0.
710.
2840.
509.
MAX
MIN
AVE
TOT
SD
*1*
16.
0.
6.
50.
6.
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*14* *5* *6* *7* *8* *9*
1.
0.
0.
40.
0.
60.
0.
6.
374,
12.
36.
0.
2.
215.
5.
30
1
4
131
6
134.
0.
7.
645.
17.
2.
0.
2.
2.
0.
30.
0.
2.
276.
4.
3.
0.
0.
16.
0.
*10*
4.
0.
4.
8.
1.
*11*
189.
0.
189.
189.
0.
*12*
36.
0.
22.
87.
15.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NHJMRER OF MANUFACTURING PLANTS.,.
CAL IFORN IA
FLOW VT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS f 1967 DOLLARS)
1075
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTIVL 4NNLUL OEM COST
TOTAL ANNUAL COST
IMUM
22000.
11521.
14700979.
767954.
2603061.
MINIMUM
4.
C.
2353.
292.
591.
AVERAGE
535.
305.
355138.
26133.
71241.
TOTAL
575279.
327494.
381773824.
28093200.
76584080.
S.O.
1323.
756.
759074.
56055.
147956.
ANNUAL COST OF hASTE
REPLACEMENT
28CS3?00. lSCg8688.
TREATMENT
INTEREST
29396560.
TOTAL
76578448.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 5COCCC.
100000. TO
50000. TC
1COOO. TO
0. TP
500000.
100000.
50000.
10000.
|_j COST RANGE
cn > 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 5COOOC.
0. TO 1CCOOO.
787954.
48S468.
99660.
49574.
S966.
MAXIMUM
IP3762C3.
4P95670.
982193.
499478.
99290.
MINIMUM
•575777.
101716.
50187.
10075,
292.
AVERAGE
647157.
194918.
69458.
22391,
5296.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
568 1357.
1015347.
503048.
100153.
2941 .
AVERAGE
9413730.
1910268.
689810.
234618.
64302.
TOTAL
2588628.
7017065.
6181796.
9560867.
2748464.
TOTAL
56482384.
170013856.
97953056.
136312880.
16525506.
S.D.
134395.
90484.
14822.
10279.
2412.
S.D.
5110836.
964838.
133258.
106848.
2C922.
NUM BER
4.
36.
69.
427.
519.
NUMBER
6.
89.
142.
581.
257.
MAX
WIN
AVE
TOT
SO
*1*
3674.
0.
180.
14947.
485.
*2*
378.
0.
20.
1499s;,
36 ,
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
*4* *5* *t* *7*
21 11 .
0.
128 .
79370.
166.
1037.
0.
42.
30516.
97.
164.
5.
27.
2920.
23.
1471.
0.
IS7.
95426.
2C1.
43.
0.
37.
262.
4.
1806.
11 .
142.
89065.
171.
12.
0.
3.
760.
2.
*10*
1960.
0.
1715.
3430.
346.
*ll*
0.
0.
0.
0.
0.
*12*
9541.
0.
2089.
50127.
2208.
MAX
WIN
4VF.
TOT
SO
*1*
183.
0.
1601.
30.
*2*
7 .
0.
1 .
717.
1 .
678.
0.
15.
9264.
37.
DISTRIBUTION OF ANN'JAL CSf TPE^TfENT CCSTS ($ 1000)
*4* *5* *6* *7*
104.
0.
4.
2895 .
7.
197.
1 .
13.
1446.
25.
170.
0.
15.
7L«l.
23.
3.
0.
2.
14.
0.
62,
1.
5 .
2868.
5.
4.
0.
1.
169.
1.
*10*
4.
0.
4.
8.
1.
0.
0.
0.
0.
C.
*12*
364.
0.
82.
1974.
84.
SD OR S.O. RFPPESENTS STANDARD CEVIATICN. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
CALIFORNIA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
„,„„,„ 1^68 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1075
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
3674.
0.
180.
14947.
485.
*2*
346.
0.
19.
13984.
34.
MAXIMUM
22000.
11521.
14700979.
787954..
2603061.
O&M
2527030«.
MINIMUM
H.
0.
2353.
292.
591.
ANNUAL COST OF WASTE
REPLACEMENT
17162064.
DISTRIBUTION OF OPERATION
MAXIMUM
787951.
489468.
99113.
49574.
9966.
MINIMUM
525777.
103765.
50092.
10009.
292.
AVERAGE
535.
265.
324876.
23507.
64772.
TREATMENT
INTEREST
26891584.
AND MAINTENANCE COST
AVERAGE
647157.
199916.
67557.
21176.
5005.
TOTAL
575279.
284810.
349241600.
25270304.
69629776.
TOTAL
69623952
TOTAL
2588628.
6397303.
4796556.
8703361.
2787928.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
18376208.
4895670.
992309.
497698.
99290.
DISTRIBUTION
*3* *4*
2111. 1037.
0. 0.
120. 36.
74013. 26176.
161. 91.
MINIMUM
5681357.
1012156.
501252.
100153.
2941.
AVERAGE
9413730.
1912997.
690370.
228020.
63252.
TOTAL
56482384.
151126768.
75250352.
135671760.
18090016.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
164. 1351.
5. 0.
26. 174.
2806. 84268.
24. 187.
*7* *8*
43. 1806.
0. 11.
37. 125.
262. 78568.
4. 163.
*9* *10*
12. 1960.
0. 0.
2. 1715.
705. 3430.
2. 346.
S.D.
1323.
735.
749635.
55125.
145924.
S.D.
134395.
92578.
14263.
10389.
2376.
S.D.
5110836.
989045.
136528.
104654.
21035.
NUMBER
4.
32.
71.
411.
557.
NUMBER
6.
79.
109.
595.
286.
*11*
0.
0.
0.
0.
0.
*12*
9541.
0.
2089.
50127.
2208.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
183.
0.
19.
1601.
30.
7.
0.
1.
692.
1.
678.
0.
14.
8399.
36.
104.
0.
3.
2494.
7.
197.
1.
13.
1387.
25.
163
0
12
6017
21
3.
0.
2.
14.
0.
62.
1.
4.
2534.
5.
4.
0.
1.
153.
1.
*10*
4.
0.
4.
8.
1.
*11*
0.
0.
0.
0.
0,
*12*
364.
0.
82.
1974.
84.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
CALIFORNIA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1075
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
3674.
0.
156.
12964.
473.
*2*
254.
0.
15.
10960.
25.
MAXIMUM
22000.
5895.
14700979.
736039.
2603061.
O6M
19687584.
MINIMUM
4.
0.
2353.
292.
591.
ANNUAL COST OF WASTE
REPLACEMENT
14760523.
DISTRIBUTION OF OPERATION
MAXIMUM
736039.
489468.
99802.
49009.
9991.
MINIMUM
538860.
101008.
50005.
10057.
292.
AVERAGE
535.
188.
274614.
18314.
53193.
TREATMENT
INTEREST
22731184.
AND MAINTENANCE COST
AVERAGE
637449.
190423.
65489.
20217.
4872.
TOTAL
575279.
202196.
295210496.
19687584.
57182400.
TOTAL
57179280
TOTAL
1274898.
5141416.
2750519.
7419480.
3103684.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
18376208.
4895670.
977296.
499246.
99663.
DISTRIBUTION
*3* *4*
1376. 529.
0. 0.
97. 26.
60309. 13671.
123. 59.
MINIMUM
5681357.
1013609.
501252.
100153.
2941.
AVERAGE
9899628.
1881659.
703878,
221724.
63949.
TOTAL
49498144.
112899552.
56310240,
127713280.
22637936.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
110. 1097.
4. 0.
20. 150.
2168. 72465.
16. 160.
*7* *8*
43. 1018.
0. 7.
37. 101.
262. 63275.
4. 120.
*9* *10*
9. 1960.
0. 0.
2. 1715.
606. 3430.
2. 346.
S.D.
1323.
476.
700617.
43928.
130S27.
S.D.
139431.
94071.
14312.
9725.
2434.
S.D.
5556985.
897173.
139616.
101279.
22954.
NUMBER
2.
27.
42.
367.
637.
NUMBER
5.
60.
80.
576.
354.
*11*
0.
0.
0.
0.
0.
*12*
9541.
0.
2089.
50127.
2208.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OgM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
183.
0.
17.
1413.
30.
7.
0.
1.
615.
1.
370.
0.
10.
6021.
23.
57.
0.
3.
1852.
5.
95.
0.
7.
816.
12.
130.
0.
10.
4809.
17.
3.
0.
2.
14.
0.
29.
1.
3.
2044.
4.
3
0
0
123
0
*10*
4.
0.
4.
8.
1.
*11*
0.
0.
0.
0.
0.
*12*
364.
0.
82.
1974.
84.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
CQLORADC
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 OCLLARS)
97
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL CSM COST
TOT4L 4NNU4L COST
COST RUNGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 5000P.
0. TO 10000.
M COST RANGE
•OD > 5000000.
ICOOOOC. TO 5COOOOO.
5000CO. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SO
*l*
6569.
0.
1672.
8359.
27 = 4.
*2*
624.
I.
79.
4998 .
133.
MAXIMUM
7500.
20529.
12246524.
1643703.
3199C11.
OSM
6191095.
OISTR
M4X1MUM
16437C3.
437354.
8S925.
31580.
9949.
MINIMUM
10.
3.
12200.
782.
2331.
4fiNU4L COST OF WSSTE
REPLACEMENT
3614300.
AVERAGE
48C.
850.
745217.
63826.
158469.
TRE4TMENT
INTEREST
5566C2C.
TOTAL
46550.
82423.
72286016.
6191095.
15371481.
TOTAL
15371415
IBUT ION OF OPERATION AND MAINTENANCE CCST
MINIMUM
1643703.
137039.
5 03 05 .
10700.
782.
AVERAGE
1643703.
220511.
71704.
18086.
5575.
TOTAL
1643703 .
3307667.
501926.
470235.
267590.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
15308155.
4650511 .
791624.
436872.
98967.
DISTRIBUTION
*3* *4*
2483. 1837.
0. 0.
182. 193.
7285. 11363.
4C9. 358.
MINIMUM
5074037.
1022620.
503804.
101190.
15251.
OF TOTAL CAPITAL CCST
*5* *6*
136. 1484.
7. 0.
35. 3S1.
496. 18772.
36. 461.
AVERUGE
8653146.
2786215.
637339 .
203582.
62601.
FOR TREATMENT ($ 10001
*7* *8*
32. 1470.
0. 16.
32. 229.
32. 15126.
0 . 2 90 .
TOTAL
25959440.
50151872.
2549356.
10382705.
1314627.
*9* *10*
12. 0.
0. 0.
3. 0.
77. 0.
4. C.
s.o.
1071.
2420.
1592064.
181395.
378878.
S.D.
0.
72780.
14867.
6428.
2582.
S.D.
57688SO.
1310768.
122393.
84794.
27566.
*11*
0.
0.
0.
0.
0.
NUMBER
1.
15.
7.
26.
48.
NUMBER
3.
18.
4.
51.
21.
*12*
3028.
0.
2890.
5780.
194.
*1*
*2*
*3*
DISTRIBUTICN OF &NNU SL OSM TREATMENT COSTS ($ 1000)
*t* *7* *8* *9*
MAX
MIN
AVE
TOT
SO
363.
0 .
IC7.
535.
145.
IP.
0 .
2.
123.
3 .
1027.
0.
40.
ise*.
162.
192.
n.
13.
772.
28.
175.
I.
3?.
445.
59.
193.
0.
41 .
1961.
56.
2.
0.
2.
2.
C.
51 ,
1,
8 .
511 ,
10.
3.
0.
1.
18.
1.
*10*
0.
0.
0.
0.
0.
*u*
0.
0 .
0.
0.
0.
*12*
124.
0.
118.
237.
8.
SD CP S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN tSED IS HIGHLY SKEWED.
-------
COLORADO
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 97
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
|^ COST RANGE
(_i > 5000000.
CO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
sp
*1*
5U83.
0.
1391.
6955.
2307.
*2*
575.
1.
65.
4097.
112.
MAXIMUM
7500.
18395.
10703240.
1492168.
2851479.
O6M
5244042.
MINIMUM
10.
3.
12200.
782.
2331.
ANNUAL COST OF WASTE
REPLACEMENT
3023831.
DISTRIBUTION OF OPERATION
MAXIMUM
1492168.
437354.
83695.
38656.
9738.
MINIMUM
1492168.
118786.
54477.
10022.
782.
AVERAGE
480.
709.
623470.
54062.
133244.
TREATMENT
INTEREST
4656697.
AND MAINTENANCE COST
AVERAGE
1492168.
181008.
65040.
16894.
4961.
TOTAL
46550.
68763.
60476624.
5244042.
12924632.
TOTAL
12924570
TOTAL
1492168.
2715116.
390242.
388552.
257988.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
13379050.
3875386.
909220.
483989.
96532.
DISTRIBUTION
*3* *4*
2314. 1649.
0. 0.
171. 152.
6827. 8990.
383. 293.
MINIMUM
5577258.
1022620.
587668.
106498.
15251.
AVERAGE
9478152.
2420253.
762837.
190582.
63038.
TOTAL
18956304.
43564560.
2288512.
9147929.
1638979.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
136. 1237.
7. 0.
32. 330.
455. 15837.
37. 385.
*7* *8*
32. 1470.
0. 12.
32. 193.
32. 12747.
0. 262.
*9* *10*
$. 0.
0. 0.
3. 0.
59. 0.
3. 0.
S.D.
1071.
2186.
1359413.
163102.
331512.
S.D.
0.
77543.
10585.
6907.
2383.
S.D.
5516708.
987072.
162698.
86148.
25376.
NUMBER
1.
15.
6.
23.
52.
NUMBER
2.
18.
3.
48.
26.
*11*
0.
0.
0.
0.
0.
*12*
2346.
0.
2239.
4478.
151.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL 0£M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
332.
0.
95.
477.
134.
16.
0.
2.
108.
2.
930.
0.
36.
1449.
147.
174.
0.
11.
640.
25.
175.
1.
30.
417.
59.
147
0
32
1523
44
2.
0.
2.
2.
0.
51.
1.
7.
430.
10.
2.
0.
1.
13.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
97.
0.
92.
185.
6.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
COLORADO
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
TOTAL NUMBER OF MANUFACTURING PLANTS... If *"" C°NDITI°NS (
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
7500.
12810.
7040471.
1085523.
1979662.
MINIMUM
10.
3.
12200.
782.
2331.
AVERAGE
555.
494292.
42721.
105H97.
TOTAL
"46550.
53872.
47946352.
4143946.
10233195.
S.D.
1071.
1702.
993663.
122950.
244585.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
UHt39U6.
2397317.
3691367.
TOTAL
10233130.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000.
10000.
i_j COST RANGE
CO > 5000000.
O 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
1085523.
437354.
96163.
45793.
9472.
MAXIMUM
8800588.
2883806.
966439.
420555.
98227.
MINIMUM
1085523.
102845.
54477.
10129.
782.
AVERAGE
1085523.
158781.
76402.
18332.
4655.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5577258.
1022620.
587668.
100369.
15251.
AVERAGE
7188923.
2025151.
792449.
165881.
59530.
TOTAL
1085523,
1905372.
534816.
348300.
269962.
TOTAL
14377846.
32402416.
3962243.
7464666.
1726371.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *n* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
3071.
0.
865.
4323.
1274.
439.
1.
51.
3229.
88.
1835.
0.
148.
5905.
315.
1154.
0.
113.
6650,
216.
136.
6.
31.
429.
38.
1005
0
275
13200
314
32.
0.
32.
32.
0.
1470.
10.
163.
10763.
237.
7.
0.
2.
49.
2.
*10*
0.
0.
0.
0.
0.
S.D.
0.
92796.
17617.
10411.
2368.
S.D.
2279235.
639737.
150581.
72835.
24098.
NUMBER
1.
12.
7.
19.
58.
NUMBER
2.
16.
5.
45.
29.
*11*
0.
0.
0.
0.
0.
*12*
1763.
0.
1683.
3366.
113.
MAX
MIN
AVE
TOT
SO
*1*
246.
0.
74.
370.
99.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*i|* *5* *6* *7* *8* *9*
13.
0.
1.
92.
2.
671.
0.
28.
1120.
106.
126.
0.
8.
488.
18.
175.
1.
29.
403.
60.
108.
0.
24.
1157.
33.
2.
0.
2.
2.
0.
51.
1.
5,
363.
9.
2.
0.
0.
10.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
73.
0.
70.
140.
5.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
CONNECTICUT
FLOW LESS THAN OR EQUAL TO MEDIAN OF MATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 306
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
26000.
8079.
1130569.
403677.
966359.
MINIMUM
1.
0.
3028.
285.
670.
AVERAGE
883.
188.
177156.
1U105.
36601.
TOTAL
270019.
57528.
5120982U.
U316061.
11200958.
S.D.
2163.
667.
358198.
31750.
76801.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1316061.
2710191.
1171151.
TOTAL
11200709.
tvs
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
0. 0. 0.
103677. 102258. 209191.
96176. 51593. 72707.
38103. 10056. 18526.
9913. 285. 1890.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE
5538211. 5538211. 5538211.
3502106. 1071328. 1790101.
977830. 581307. 721317.
192123. 101861. 198137.
99818. 3785. 61267.
TOTAL
0.
1017168.
651361.
1611789.
1002515.
TOTAL
5538211.
11323238.
8655801.
30956208.
8290122.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *l|* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
805.
0.
62.
1051.
192.
279.
0.
10.
2511.
19.
920.
0.
77.
19220.
81.
803.
0.
21.
5832.
67.
139.
5.
23.
291.
36.
1228
0
121
13983
181
0.
0.
0.
0.
0.
1181.
5.
111.
11005.
206.
11.
0.
2.
312.
2.
*10*
0.
0.
0.
0.
0.
S.D.
0.
121323.
11319.
7168.
2175.
S.D.
0.
869927.
132362.
96838.
21690.
NUMBER
0.
5.
9.
87.
205.
NUMBER
1.
8.
12.
156.
129.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
56.
0.
7.
111.
11,
5.
0.
1.
178.
0.
101.
0.
7.
1710.
11.
39.
0.
2.
597.
t».
152.
1.
15.
198.
11.
171
0
10
1075
22
0.
0.
0.
0.
0.
17.
0.
1.
376.
7.
5.
0.
0.
72.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
CONNECTICUT
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
TOTAL NUMBER OF MANUFACTURING PLANTS... 3of "*" C°NDI™S ( ^ D°LLARS>
CO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
805.
0.
61.
1042.
193.
*2*
279.
0.
9.
2359.
19.
MAXIMUM
26000.
8079.
4430569.
403677.
966359.
O6M
38796-67.
MINIMUM
4.
0.
3028.
285.
670.
ANNUAL COST OF WASTE
REPLACEMENT
2485719.
DISTRIBUTION OF OPERATION
MAXIMUM
0.
1*03677.
97433.
44377.
9943.
MINIMUM
0.
101897.
51924,
10288.
285.
AVERAGE
883.
162.
162465.
12679.
33313.
TREATMENT
INTEREST
3828006.
AND MAINTENANCE COST
AVERAGE
0.
207616.
71455.
18178.
4784.
TOTAL
270049.
49462.
49714400.
3879667.
10193636.
TOTAL
10193392
TOTAL
0.
830464.
643094.
1363379.
1042834.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
5538211.
2892935.
977830.
492123.
99848.
DISTRIBUTION
*3* *4*
920. 803.
0. 0.
72. 19.
18155. 5134.
80. 60.
MINIMUM
5538211.
1124138.
515020.
100681.
3785.
AVERAGE
5538211.
1714164.
710205.
189546.
63533.
TOTAL
5538211.
10284984.
9942864.
27484176.
8894557.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
139. 1048.
5. 0.
22. 112.
287. 12614.
36. 155.
*7* *8*
0. 1484.
0. 5.
0. 99.
0. 9837.
0. 189.
*9* *10*
14. 0.
0. 0.
2. 0.
287. 0.
2. 0.
S.D.
2163.
589.
331824.
29323.
70973.
S.D.
0.
136210.
17914.
7134.
2452.
S.D.
0.
697310.
158313.
88182.
24200.
NUMBER
0.
4.
9.
75.
218.
NUMBER
1.
6.
14.
145.
140.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
56.
0.
6.
107.
14.
5.
0.
1.
172.
0.
104.
0.
6.
1585.
11.
39.
0.
2.
532.
4.
152.
1.
15.
194.
41.
135
0
8
893
17
0.
0.
0.
0.
0.
47.
0.
3.
332.
6.
5,
0.
0.
65.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
CONNECT ICUT
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS*
306
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL 0£M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TC
500000.
1000 00.
50000.
10000.
CO COST RANGE
ca > 5000000.
1000000. TO 5000000.
5000CO. TO 1000000.
100000. TO 5COOOO.
0. TO 100000.
MAX
MIN
AVE
TOT
SO
*l*
805.
0.
64.
1084.
192.
*2*
279.
0.
11.
2816.
20.
MAXIMUM
26000.
8079.
4430569.
403677.
966359.
OEM
4764548.
OISTR
MAXIMUM
C.
403677.
96176.
38403.
9992.
MINIMUM
4.
0.
3028.
285.
670.
ANNUAL COST OF WASTE
REPLACEMENT
2894 L67.
AVERAGE
883.
205.
189161.
L5570.
39595.
TREATMENT
INTEREST
4457016.
IBUTION OF OPERATION AND MAINTENANCE CCST
MINIMUM
0.
129100.
54593.
10056.
285.
AVERAGE
0.
220525.
72726.
18953 .
4851.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
5538211.
35024C6.
977830.
492123.
99848.
DISTRIBUTICN
*3* *4*
920. 8C3.
0. 0.
85. 24.
21309. 6464.
87. 68.
MINIMUM
5538211 .
1071328.
516472.
100083.
3785.
OF TOTAL CAPITAL CCST
*5* *6*
139. 1228.
5. 0.
24. 126.
309. 14203.
36. 182.
AVERAGE
5538211.
1731731 .
679012.
207767.
62384.
FOR TREATMENT ( $ 1000)
* 7* * 8*
0. 1484.
0. 5.
0. 115.
0. 11337.
0. 206.
TOTAL
270049.
62741.
57883360.
4764548.
12115981.
TOTAL
12115731.
TOTAL
0.
I 102625.
727263.
2046955.
887796.
TOTAL
5538211.
15585583.
9506173.
34489360.
7236531.
*9*
17.
0.
2.
363.
2.
*10*
0.
0.
c.
0.
0.
s.o.
2163.
672.
360475.
32594.
77772.
S.O.
0.
11 1223.
13500.
7891.
2659.
S.O.
0.
832561.
129813.
94358.
24624.
NUMBER
0.
5.
10.
108.
183.
NUMBER
1.
9.
14.
166.
116.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS <$ 1000»
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SO
56.
0.
7.
120.
14.
5.
0.
1 .
189.
0.
1 14.
0.
8.
1996.
13.
39.
0.
2.
674.
5.
152.
1.
16.
212.
41.
171
0
10
1097
22
0.
0.
0.
0.
0.
47.
0.
4.
388.
7 .
8.
0.
1 .
89.
1 .
*10*
C.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USEC IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
CELAWARfc
FLOW VT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DCLLARS)
69
MANUFACTURING EMPLOYMENT
Fl CW < MGY )
TOTAL CAPITAL COST
T3T\L 4NNU4L OCM COST
TOTAL ANNUAL CHS.T
MAXIMUM
8500.
2478.
6091=177.
284314.
1057C43.
MINIMUM
25.
e.
28579.
1176.
48C6.
AVERAGE
520.
304.
490718.
25939.
88260.
TOTAL
35884.
20996.
33859536.
1789759.
6089941.
S.O.
1121.
498.
794486.
46918.
143983.
0€M
ANNUAL COST OF WASTE
REPLACEMENT
1692<76.
TREATMENT
INTEREST
2607182.
TOTAL
6089917.
DISTRIBUTION OF OPER6TICN AI^O MAINTENANCE CCST
COST RANGF
> SCOOOC.
loroon. TO
•50000. TO
toroo. TO
0. TO
•500000.
100000.
5COOO.
10000.
to CCST RANGE
#N > 5000COC.
1000000. TO 50COOOO.
•500000. TO 1000000.
100000. TO 500000.
0. TO 1CCOOO.
MAX IMUM
0.
?<>4314.
72731.
36900.
99S7.
MAXIMUM
7614471.
2452887.
95267C.
450584.
9S025.
MINIMUM
0 .
11067?.
52731.
1 1068.
1176.
AVERAGE
0.
217818 .
58793.
20001.
5126.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINI '4UM
7614471.
1012700.
516615.
172375.
3?724.
AVERAGE
7614471.
1562821.
698647.
249378.
59819 .
TOTAL
0.
653453.
352759.
640033.
143524.
TOTAL
7614471.
14065391.
11876993.
8229485.
538373.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
*7* *8* *9*
MAX
M IN1
A VE
TOT
SO
* J *
fl5C.
0.
I 69.
1355.
306.
*2*
169.
7 .
30.
167?.
31 .
*?*
849.
0 .
152.
6247.
166.
*4*
300.
0.
52.
2270.
64.
*5*
41.
11.
26.
285.
10.
*6*
755.
0.
232.
8801 .
1 86.
0.
0.
0.
0 .
0.
569,
12 .
158.
8715,
124.
9.
1 .
4.
35.
3.
*10*
0.
0.
c.
0.
0.
S.D.
0.
93686.
7589.
6838.
2796.
S.D.
0.
493468.
137999.
115351.
25150.
NUMBER
0.
3.
6.
32.
28.
NUMBER
1.
9.
17.
33.
9.
C.
0.
0.
0.
0.
*12*
4480.
0.
4480.
4480.
0.
MIN
SVE
TOT
SO
*1*
70 .
0.
14R.
30.
*?*
QISTRI8UTICN OF ANNUAL C£N TREATMENT CCSTS It 10001
*6* *7* *8* *9*
4.
0.
1 .
f- >
1.
153.
C.
12.
504 .
26.
29.
0.
4.
156.
5.
14.
1 .
7.
79.
4.
75.
0.
13.
4£3.
15.
C.
0.
0.
0.
0.
17.
1.
4 .
210.
3,
2.
0.
1 .
6.
1.
*1C*
0.
0.
0.
0.
c.
*11*
0.
0.
0.
0.
0.
*12*
147.
0.
147.
147.
0.
SO
S.n. REPRESENTS STANDARD CFVIATICN. ThE DATA OISTRIBUTICN USED IS HIGHLY SKEWED.
-------
DELAWARE
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 69
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
8500.
2478.
U132308.
2581*67.
720765.
MINIMUM
25.
8.
28579.
1176.
4806.
AVERAGE
520.
286.
456443.
21236.
82204.
TOTAL
35881*.
19752.
31494544.
1672262.
5672089.
S.D.
1121.
t*58.
600641.
40448.
112533.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1672262.
1574727.
2425078.
TOTAL
5672067.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
., COST RANGE
t3 > 5000000.
cn 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAX
MIN
AVE
TOT
SD
*1*
*2*
MAXIMUM
0.
2581*67.
61529.
36900.
9997.
MAXIMUM
5165385.
2452887.
952670.
450584.
99025.
MINIMUM
0.
110672.
52731.
11068.
1176.
AVERAGE
0.
188367.
56887.
20355.
5173.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5165385. 5165385.
1012700. 1536693.
518615. 698647.
102375. 246274.
35724. 61507.
TOTAL
0.
565101.
341323.
610652.
155195.
TOTAL
5165385.
13830240.
11876993.
7880765.
615068.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
462.
0.
121.
964.
192.
169.
2.
29.
1637.
31.
849.
0.
146.
6006.
159.
300
0
49
2178
62
41.
11.
26.
282.
10.
672.
0.
228.
8679.
181.
0.
0.
0.
0.
0.
497.
12.
156.
8597.
120.
9.
1.
4.
35.
4.
*10*
0.
0.
0.
0.
0.
S.D.
0.
74190.
3955.
6875.
2792.
S.D.
0.
480574.
137999.
117165.
24305.
NUMBER
0.
3.
6.
30.
30.
NUMBER
1.
9.
17.
32.
10.
*11*
0.
0.
0.
0.
0.
*12*
3115.
0.
3115.
3115.
0.
MAX
MIN
AVE
TOT
SD
*1*
63.
0.
16.
125.
25.
*2*
4.
0.
1.
55.
1.
*3*
153.
0.
12.
476.
25.
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
29.
0.
3.
150.
5.
14.
1.
7.
78.
4.
75.
0.
12.
473.
15.
0.
0.
0.
0.
0.
17.
1.
4.
207.
3.
2.
0.
1.
6.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
103.
0.
103.
103.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
DELAWARE
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
TOTAL NUMBER OF MANUFACTURE PLANTS... "5° "^ C°NDITI°NS ( 1967 D°LLARS)
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
8500.
2478.
3070378.
258U67.
536315.
MINIMUM
25.
8.
28579.
1176,
4806.
AVERAGE
520.
250.
l»14950.
21901.
74600.
TOTAL
35884.
17257.
28631552.
1511179.
5147403.
S.D.
1121.
403.
505294.
36976.
96884.
ANNUAL COST OF WASTE TREATMENT
OEM REPLACEMENT INTEREST
1511179.
1431577.
2204628.
TOTAL
5147384.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
to
T RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
0.
258467.
84343.
48804.
9117.
MAXIMUM
0.
3837972.
952670.
450584.
99025.
MINIMUM
0.
146378.
52731.
10488.
1176.
AVERAGE
0.
202422.
60728.
20334.
4759.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
1012700. 1787040.
541548. 695214.
105552. 234845.
35724. 64795.
TOTAL
0.
404845.
364371.
589674.
152298.
TOTAL
0.
16083365.
11818636.
7045341.
842330.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *u* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
398.
0.
99.
795.
155.
169.
2.
27.
1516.
31.
849.
0.
143.
5847.
156.
300.
0.
47.
2055.
59.
41.
10.
24.
264.
10.
577
0
209
7952
170
0.
0.
0.
0.
0.
416.
12.
142.
7833.
111.
7.
1.
3.
28.
3.
*10*
0.
0.
0.
0.
0.
S.D.
0.
79260.
12034.
8621.
2476.
S.D.
0.
892960.
142499.
103857.
25443.
NUMBER
0.
2.
6.
29.
32.
NUMBER
0.
9.
17.
30.
13.
*11*
0.
0.
0.
0.
0.
*12*
2341.
0.
2341.
2341.
0.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
63.
0.
14.
112.
23.
4.
0.
1.
52.
1.
153.
0.
11.
460.
25.
29.
0.
3.
140.
5.
14.
1.
6.
69.
4.
57
0
11
409
13
0.
0.
0.
0.
0.
13.
1.
3.
186.
3.
1.
0.
1.
5.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
78.
0.
78.
78.
0.
SD OR S.'D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAI NUP8EP CF MANUFACTURING PLANTS,
1968
?0
DISTRICT OF COLUMBIA
FLOW AT OBSERVED 1968 LEVEL
FLOW CONDITIONS ( 1967 COLLARS >
"ANUFACTURING FMPLTYVfNT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL 0£M CCST
TOT1L ANlNU&L COST
600.
411.
?87011.
40051.
765C1.
MINIMUM
4C.
7.
30523.
1640.
AVERAGE
216.
81.
95145.
7887.
19970.
TOTAL
4320.
1619.
1902904.
157731.
399399.
S.O.
170.
109.
69638.
10119.
18756.
DEM
ANNU4L COST OF WASTE TREATMENT
REPLACEMENT INTEREST
157731.
95145.
146524.
TOTAL
3S9399.
DISTRIBUTION OF OPERATION AND MAINTENMMCE COST
COST
> ^00000.
icncoo. TO
500PO. TO
10000. TC
0. TO
5CCOOC.
10000C.
^0000.
1COOC.
COST RANGE
> 50COOOO.
1COOOCC. TO *CCCOOC.
5000CO. TO ICCOOOO.
100000. TP 500000.
0. TO ICOOOO.
MAXIMUM
0.
0.
0.
40051.
CHXIMUM
0.
0.
c.
MINIMUM
0.
0.
0.
L 1228.
1640.
AVERAGE
0.
0.
0 .
23934.
3875.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
90385.
MINIMUM
0.
0.
0.
107252.
38154.
AVERAGE
0 .
0.
0 .
192144.
59031.
TOTAL
0.
0.
0.
95737.
61994.
TOT4L
0.
0.
0.
1729294.
649336.
S.O.
0.
0.
0.
13792.
2414.
S.D.
0.
0.
0.
80673.
20476.
NUMBER
0.
0.
0.
4.
16.
NUMBER
0.
0.
0.
9.
11.
MAX
MIN
AVF
TOT
SO
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TREATMENT ($ 10001
*4* *?* *6* *7* *8* *9*
7.
0.
7.
7.
0.
S .
0.
2 .
14 .
1 .
231 .
20.
82.
738.
76.
5(S.
0.
17.
137.
21.
8.
0.
8.
S.
0.
MO.
0.
fl.
563.
36.
0.
0 .
0.
0.
0.
53.
9.
26.
436.
15.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
c.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MINI
AVF
TOT
SD
*1*
1
0.
1.
1 .
C.
1 .
0 .
0.
?.
0 .
*3*
1 .
o.
PC.
II.
OISTRI8UTICN OF *NNU&L C£M TREATMENT COSTS (t 1000)
*4* *5* *f* * 7* * 8* *9*
0.
2.
20.
3.
2.
0.
0.
11.
0.
3.
31.
3.
0.
0.
0 .
0.
0.
2 .
I .
1 .
22 .
L .
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD PR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRI811ICN USED IS HIGHLY SKEWED.
-------
DISTRICT OF COLUMBIA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
TW™T IVTTT,.,, r, 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 20
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
600.
355.
259728.
35198.
6818U.
MINIMUM
40.
7.
30523.
1640.
5517.
AVERAGE
216.
76.
92682.
7458.
19229.
TOTAL
4320.
1522.
18536U3.
149162.
384575.
S.D.
170.
96.
63528.
8878.
16730.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
149162.
92682,
1<»2730.
TOTAL
384575.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
^ COST RANGE
tC > 5000000.
OO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAX
MIN
AVE
TOT
SD
*1*
7.
0.
7.
7.
0.
*2*
MAXIMUM
0.
0.
0.
35198.
7778.
MAXIMUM
0.
0.
0.
324660.
90385.
MINIMUM
0.
0.
0.
11228.
1640.
AVERAGE
0.
0.
0.
21792.
3875.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
0. 0.
0. 0.
107252. 185302.
38154. 59031.
TOTAL
0.
0.
0.
87169.
61994.
TOTAL
0.
0.
0.
1667718.
649336.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *n* *5* *6* *7* *8* *9*
5.
0.
2.
14.
1.
211.
20.
78.
702.
69.
49
0
15
124
18
8.
0.
8.
8.
0.
140.
0.
51.
563.
36.
0.
0.
0.
0.
0.
53.
9.
26.
436.
15.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
S.D.
0.
0.
0.
11298.
2414.
S.D.
0.
0.
0.
67727.
20476.
NUMBER
0.
0.
0.
4.
16.
NUMBER
0.
0.
0.
9.
11.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*1*
1.
0.
1.
1.
0.
*2*
1.
0.
0.
3.
0.
*3*
28.
1.
8.
73.
10.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*6* *7* *8* *9*
7.
0.
2.
18.
2.
2.
0.
2.
2.
0.
11.
0.
3.
31.
3.
0.
0.
0.
0.
0.
2.
1.
1.
22.
1.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRKSBNTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
DISTRICT OF COLUMBIA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 20
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOTAL ANNUAL COST
MAXIMUM
600.
248.
203386.
25585.
51415.
MINIMUM
40.
7.
30523.
1640.
5517.
AVERAGE
216.
65.
86656.
6498.
17504.
TOTAL
4320.
1295.
1733111.
129965.
350070.
S.D.
170.
69.
51017.
6415.
12663.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
129965.
86656.
133449.
TOTAL
350070.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
to
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000,
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
*2*
MAXIMUM
0.
0.
0.
25585.
7778.
MAXIMUM
0.
0.
0.
254233.
90385.
MINIMUM
0.
0.
0.
11228.
1640.
AVERAGE
0.
0.
0.
16993.
3875.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
0. 0.
0. 0.
107252. 168561.
38154. 59031.
TOTAL
0.
0.
0.
67972.
61994.
TOTAL
0.
0.
0.
1517053.
649336.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*l|* *5* *6* *7* *8* *9*
7.
0.
7.
7.
0.
5.
0.
2.
14.
1.
169.
20.
70.
626.
53.
34.
0.
12.
95.
12.
8.
0.
8.
8.
0.
125.
0.
50.
547.
33.
0.
0.
0.
0.
0.
53.
9.
26.
436.
15.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
S.D.
0.
0.
0.
6924.
2414.
S.D.
0.
0.
0.
41369.
20476.
NUMBER
0.
0.
0.
4.
16.
NUMBER
0.
0.
0.
9.
11.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
1.
0.
1.
1.
0.
*2*
1.
0.
0.
3.
0.
*3*
21.
1.
7.
59.
7.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
5.
0.
2.
14.
2.
2.
0.
2.
2.
0.
9.
0.
3.
29.
3.
0.
0.
0.
0.
0.
2.
1.
1.
22.
1.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER (if M 1NUF 1C TUP ING PLANTS..
1963
256
FLOHICB
FLOW AT HBSERVfC 1968 LEVEL
FLOW CONDITIONS ( 1967 DOLLARS)
MSNUF STORING EMPLOYMENT
Fl CW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNLAl CCST
MAXI
8146s).
66683S20.
3125120.
IC?24305.
MINIMUM
10.
1 1.
26789.
1212.
4878.
4VERAGE
420.
1790.
1144018.
72468.
217761.
TOTU
107534.
458206.
292868608.
18551808.
55746768.
s.o.
829.
8168.
5581C69.
291592.
977193.
OEM
ANNUAL COST OF WASTE TREATMENT
PEPLACEMENT INTEREST
1464342S.
22550864.
TOTAL
55746096.
CO
o
COST RANGE
TP
TH
TO
5TOC.
1COOO
0. TO
•500000.
I 00000,
^0000.
10000.
COST RANGE
•> srroooo.
1000000. TO 5COOOOC.
500000. TO 1000000.
1000CO. TP ^CCOOC.
0. TO ICOOOO.
A 1*
MAX
WIN
AVF
TOT
SO
*2*
MX 1FUM
312512C.
326339.
91756.
471S6.
9006.
fax
DISTRIBUTION OF TPERATICN AND MAINTENANCE CCST
MIN HUM
604990 .
100263.
51735.
10241 .
1212.
AVERAGE
1351079.
200202.
70454.
20094.
4779.
DISTRIBUTION' GF INVESTMENT REQUIREMENTS
4P43651.
99706».
990c-5.
M IN IM UM
5560183.
101 1149.
509285.
132134 .
33466.
AVERAGE
24949520.
2209197.
669975.
222174.
73827.
*3*
DISTRIBUTION OF TOTAL C4PIT4L CCST FCR TREATMENT (* 1000)
t
TOTAL
12159713.
3203237.
774S91.
1788338.
626103.
TOTAL
274444800.
35347152,
20769216.
31326464.
4208138.
*5*
* 7*
* 8*
*q*
37601.
0.
4735.
3 ?8fi 1 .
13780.
4064 .
2.
68.
1120P .
346 .
22?^.
0 .
159.
19093.
243.
21S09.
0.
525.
7C313.
2323.
100.
8.
26.
1072.
21.
8209.
0.
429.
54CE6.
?c,8 .
63.
0.
45.
446.
U.
6205 .
12.
286 .
49557 .
812.
9
I
3
165
2
S.O.
849162.
75238.
13744.
9117.
2404.
S.O.
244C9360.
1355703.
150869.
99954.
19759.
NUMBER
9.
16.
11.
89.
131.
NUMBER
11.
16.
31.
141.
57.
0.
0.
0.
0.
c.
*11*
11589.
0.
77C2.
23105.
3470.
*12*
25427.
0.
12575.
25950.
17610.
DISTRIBUTION OF ANNUAL OEM TREATMENT CCSTS ($ 1000»
*4* *5# *6* *7*
MAX
M IN
4VF
TOT
SC
443.
0.
63 .
501.
154.
50 .
0.
) .
223.
4.
441 .
0.
20.
23«3 .
48.
695.
0.
21.
2766.
73.
150.
1 .
17.
693.
31.
2C45
0
57
7228
211
8.
TJ.
3.
35.
2.
335.
1.
10.
1815.
38 .
3.
0.
I.
34.
1.
*10*
0.
0.
0.
0.
0.
*u*
1015.
0.
680.
2040.
299.
*12*
807.
0.
413.
826.
558.
sr> OR S.D. REPRESENTS STHND&RI: DEVIATION.
THE DAT» DISTRIBUTION USED IS HIGHLY SKEWED.
-------
FLORIDA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 256
MANUFACTURING EMPLOYMENT
FLOW 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
|_4 COST RANGE
CO > 5000000.
)-• 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
*1*
*2*
MAXIMUM
3125120.
405213.
98445.
44733.
9808.
MAXIMUM
83354896.
4843651.
963057.
481570.
98351.
MINIMUM
506185.
112620.
51380.
10072.
1173.
AVERAGE
1186376.
204414.
75118.
19058.
4477.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5560183.
1045030.
502718.
102134.
26467.
AVERAGE
21404976.
2055569.
683071.
222998.
71475.
TOTAL
9491009.
2861798.
676062.
1562719.
640192.
TOTAL
235454736.
26722400.
15710634.
30996720.
5003222.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *t(* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
37601.
0.
4735.
37879.
13280.
4064.
1.
65.
10804.
346.
2230.
0.
139.
16697.
232.
21509.
0.
412.
55182.
2041.
99.
8.
25.
1029.
21.
8209
0
373
47021
922
o3.
0.
44.
443.
11,
6039.
12.
235.
40720.
657.
8.
0.
3.
129.
2.
*10*
0.
0.
0,
0.
0.
S.D.
899825.
84510.
16916.
8934.
2273.
S.D.
24391632.
1166261.
151216.
106464.
19419.
NUMBER
8.
14.
9.
82.
143.
NUMBER
11.
13.
23.
139.
70.
*11*
7652.
0.
5085.
15255.
2291.
*12*
25427.
0.
12975.
25950.
17610.
*1*
MAX
MIN
AVE
TOT
SD
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*H* *5* *6* *7* *8* *9*
443.
0.
63.
500.
154.
50.
0.
1.
212.
4.
441.
0.
17.
1999.
45.
695.
0.
17.
2218.
66.
148.
1.
16.
667.
31.
2045.
0.
48.
6003.
199.
8.
0.
3.
34.
2.
335.
1.
8.
1388.
30.
2.
0.
0.
23.
0.
*10*
0.
0.
0.
0.
0.
677.
0.
453.
1360.
199.
*12*
807.
0.
413.
826.
558.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
FLORIDA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
™a,,T »m „ 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 256
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
7500.
65893.
41356960.
2604477.
6857330.
MINIMUM
10.
5.
14719.
990.
3308.
AVERAGE
999.
751196.
46821.
142220.
TOTAL
10753U.
255692.
192306176.
11986140.
36408368.
S.D.
829.
5000.
3652308.
208651.
661137.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
119861140.
9615308.
11807568.
TOTAL
36409008.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
>_! COST RANGE
CO > 5000000.
IO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE TOTAL
2604477. 506198. 1143241. 6859450.
413180. 124442. 224501. 2694008.
94231. 52467. 69753. 697534.
46566. 10117. 18419. 957776.
9875. 990. 4417. 777438.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE TOTAL
51696192. 5604668. 20509888. 164079200.
4775635. 1078965. 2635790. 31629488.
963547. 503460. 690351. 12426322.
495417. 101215. 208580. 25863936.
99632. 18399. 67923. 6384781.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6* *7* *8* *9*
6.
0.
2.
104.
1.
MAX
MIN
AVE
TOT
SD
19456.
0.
2457.
19657.
6869.
3469.
1.
54.
8892.
295.
1767.
0.
107.
12894.
186.
17450.
0.
321.
43060.
1643.
81.
7.
20.
821.
17.
7299.
0.
321.
40493.
814.
57.
0.
40.
400.
10.
5269
7
195
33790
563
*10*
0.
0.
0.
0.
0,
S.D.
778210.
100852.
14005.
8213.
2448.
S.D.
17115792.
1515102.
159251.
100351.
21311.
NUMBER
6.
12.
10.
52.
176.
NUMBER
8.
12.
18.
124.
94.
*11*
6364.
0.
4229.
12688.
1905.
*12*
19112.
0.
9753.
19505.
13236.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
329.
0.
46.
371.
114.
42.
0.
1.
182.
4.
318.
0.
12.
1421.
33.
574
0
13
1744
54
103.
1.
11.
454.
21.
1717.
0.
39.
4898.
167.
6.
0.
3.
27.
2.
271.
0.
6.
1110.
24.
1.
0.
0.
18.
0.
*10*
0.
0.
0.
0.
0.
*11*
565.
0.
379.
1136.
167.
*12*
611.
0.
313.
625.
422.
SD OR S.D.
REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER CF MANUFACTURING PLANTS...
1968
42 I
GEORGIA
FLOW AT TBSEKVEC 1968 LEVEL
FLOW CONDITIONS ( 1967 DCLLARSI
MANUFACTURING EMPLOYMFKT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUM 0£M COST
TOTAL ANNUAL COST
MAXIMUM
36000.
38367.
2C772928.
1198482.
3836443.
MINIMUM
15.
6.
20092.
1020.
3572.
AVERAGE
628.
372291.
24658.
71937.
TOTAL
238919.
264213.
156734704.
10380879.
30285376.
S.D.
2160.
2747.
1196155.
80420.
230786.
ANNUAl COST OF WASTE
OEM REPLACEMENT
1C36C079. 7836734.
TREATMENT
INTEREST
1 2068566.
TOTAL
30286160.
DISTRIBUTION OF PPER4TICN »NO M8INTENANCE COST
CTST RANGE
> 5l">OCnC.
100000. TO
50000. TP
10000. TO
0. TP
5CCOOO.
100000.
50000.
10000.
MAXIMUM
I
CO COST RWMCE
CO > 5000000.
icooono. TO
500000. TP 10COOOO.
100000. TC 5COOOO.
o. TO iroooo.
MAX
M IN
AVE
TOT
SO
96789.
49678.
<5841.
M4XIMUM
25966L60.
4954611.
997CO.
494491.
39651.
MI N IM UM
507275.
111?16.
5C931.
10071.
1020.
AVERAGE
852878.
245968 .
74033.
20724.
5501 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5868183.
10 32376.
50C590.
100619.
AVERAGE
1C576585.
2150283.
729350 .
225926.
72672.
TOTAL
1705756.
3689521.
814367.
2735587.
1435697.
TOTAL
52892928.
49456512.
2115U36.
6777 7856.
4651C22.
*1*
728.
0 .
154.
1655.
263.
*?*
237
3592
29
riSTR IBUT ION OF THTAL CAPITAL CCST FOR TREATMENT it iooo>
*?* *4* *5* *6* *7* *8* *9*
100P.
0.
113.
2323^.
1<8.
6«21.
0.
73.
23693.
434.
122.
8.
22.
1448 .
16.
2641 .
0.
48020.
14 = ,
40.
o,
34.
235.
4 .
3945.
11 .
146.
46406.
335 .
21.
0 ,
4.
322.
4,
*10*
C.
0.
0.
0.
0.
s.o.
488757.
127604.
18836.
10130.
2259.
S.D.
8621538.
1217968.
154150.
96055.
21575.
NUMBER
2.
15.
11.
132.
261.
NUMBER
5.
23.
29.
300.
64.
7366.
0.
7366.
7366.
0.
*12*
722.
0.
722.
722.
0.
DISTRIBUTION OF 4NNU »L
MIN
*VF
TOT
SD
*!*•
PO.
C.
16.
t 72 .
24.
r .
i .
149 .
0.
203.
C .
11 .
22 3P.
23.
181.
0 .
4.
1283.
14.
1C4.
1.
a.
541.
14.
*£ *
344.
0.
16 .
3929.
48 .
CCSTS ($ 1000)
*7* * 8*
2 .
0.
2.
II.
0.
128 .
I.
4 ,
1370.
12.
8 .
0.
1.
63 .
1.
*10*
0.
0.
C.
0.
C.
*11*
603 .
0.
6C3.
603 .
0.
23.
0.
23.
23.
0.
sn PP s.n. PFPPFSF^Tc, STAM-'APC CFVIATICN. THE DATA DT STR IBUT ICN USED is HIGHLY SKEWED.
-------
GEORGIA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
ivvnrT »„ 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 421
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
>_l COST RANGE
O3 > 5000000.
*•* 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
728.
0.
132.
1456.
233.
*2*
227.
1.
13.
3145.
26.
MAXIMUM
36000.
20136.
12928041.
742169.
2384028.
O6M
7898979.
MINIMUM
15.
4.
14615.
718.
2574.
ANNUAL COST OF WASTE
REPLACEMENT
6332630.
AVERAGE
568.
416.
300838.
18762.
56967.
TREATMENT
INTEREST
9752247.
TOTAL
238919.
175240.
126652624.
7898979.
23983104.
TOTAL
23983856
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
742169.
335901.
91026.
49678.
9884.
MINIMUM
742169.
100491.
50691.
10181.
718.
AVERAGE
742169.
203367.
73867.
20232.
5243.
TOTAL
742169.
2440407.
886403.
2367145.
1462904.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
16160051.
4672758.
986104.
493810.
99651.
DISTRIBUTION
*3* *4*
1008. 3611.
0. 0.
100. 49.
20627. 14996.
135. 233.
MINIMUM
16160051.
1004533.
500590.
100619.
18269.
OF TOTAL CAPITAL COST
*5* *6*
107. 1848.
8. 0.
20. 169.
1341. 40841.
14. 245.
AVERAGE
16160051.
2218278.
722910.
226605.
72067.
FOR TREATMENT ($ 1000)
*7* *8*
40. 2606.
0. 10.
33. 120.
234. 38157.
4. 225.
TOTAL
16160051.
53238672.
19518560.
62769568.
6630155.
*?* *10*
20. 0.
0. 0.
3. 0.
269. 0.
3. 0.
S.D.
2160.
1473.
768214.
51275.
147581.
S.D.
0.
79097.
16737.
9701.
2312.
S.D.
0,
1245968.
139359.
95595.
21730.
NUMBER
1.
12.
12.
117.
279.
NUMBER
1.
24.
27.
277.
92.
*11*
4864.
0.
4864.
4864.
0.
+ 12*
722.
0.
722.
722.
0.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*6* *7* *8* *9*
MAX
MIR
AVE
TOT
SD
80.
0.
14.
159.
23.
5.
0.
1.
139.
0.
203.
0.
9.
1895.
20.
102.
0.
3.
902.
8.
83.
1.
7.
472.
11.
202
0
12
2802
28
2.
0.
2.
11.
0.
70.
1.
3.
1046.
7.
5.
0.
1.
49.
1.
*10*
0.
0.
0.
0.
0.
*11*
402.
0.
402.
402.
0.
*12*
23.
0.
23.
23.
0.
St> OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
GEORGIA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 421
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
|_, COST RANGE
C*} > 5000000.
cn 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
i»59.
0.
70.
770.
135.
*2*
227.
1.
10.
2339.
21.
MAXIMUM
36000.
15121.
10512105.
601655.
1936692.
OSM
5944542.
MINIMUM
15.
3.
10489.
616.
2220.
ANNUAL COST OF WASTE
REPLACEMENT
5180740.
DISTRIBUTION OF OPERATION
MAXIMUM
601655.
248852.
94026.
48824.
9913.
MINIMUM
601655.
103176.
52230.
10136.
616.
AVERAGE
568.
299.
246116.
14120.
45376.
TREATMENT
INTEREST
7978336.
AND MAINTENANCE COST
AVERAGE
601655.
183267.
70393.
18905.
4774.
TOTAL
238919.
125882.
103614816.
5944542.
19103296.
TOTAL
19103616
TOTAL
601655.
1466137.
563144.
1852738.
1460925.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
13140131.
3843687.
965648.
490299.
99649.
DISTRIBUTION
*3* *4*
878. 2723.
0. 0.
76. 35.
15640. 10753.
101. 175.
MINIMUM
13140131.
1007220.
520685.
100575.
13112.
AVERAGE
13140131.
2120904.
686437.
216873.
67727.
TOTAL
13140131.
36055376.
16474492.
55519408.
8330376.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
72. 1577.
5. 0.
16. 149.
1062. 36147.
10. 209.
*7* *8*
36. 2167.
0. 5.
30. 100.
211. 31901.
4. 184.
*9* *10*
9. 0.
0. 0.
3. 0.
204. 0.
2. 0.
S.D.
2160.
1087.
619718.
39611.
117548.
S.D.
0.
52154.
17339.
9010.
2281.
S.D.
0.
1004566.
136165.
92905.
22136.
NUMBER
1.
8.
8.
98.
306.
NUMBER
1.
17.
24.
256.
123.
*11*
4045.
0.
4045.
4045.
0.
*12*
543.
0.
543.
543.
0.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS <$ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
60.
0.
9.
101.
17.
4.
0.
1.
120.
0.
149.
0.
6.
1217.
14.
78.
0.
2.
651.
6.
40.
1.
4.
294.
6.
160
0
10
2305
22
2.
0.
1.
9.
0.
54.
0.
3.
863.
5.
2.
0.
0.
32.
0.
*10*
0.
0.
0.
0.
0.
*11*
336.
0.
336.
336.
0.
*12*
18.
0.
18.
18.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
IDAHC
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 OOLL4RSI
53
0>
MANUFACTURING EMPLOYMENT
FLOW (MOV)
THTU CAPITAL COST
THTAL ANNUAL C£M COST
TOTAL ANNUAL COST
COST R4NGE
lOOOno. TO 5COOOO.
5000C. TP 1COOOP.
1OOTO . TH K0000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO
5COCCO. TO
100"0">. Tn
0. TC
MAX
WIN
WE
TOT
SO
50COOOO.
10CCOOO.
5COOOO.
100000.
* 1*
334.
0.
334.
334.
0.
*2*
227,
P .
f-7 .
18P4 .
67.
rHXI ^UM
2400.
13?03.
1 1161CE4.
703117.
21 33273.
OCM
2863240.
OISTR
PAXlfUM
703117.
219773.
67C78.
407*2.
8250.
MINIMUM
2 U
19.
47198.
2047.
8041.
ANNUAL COST OF WASTE
REPLACEMENT
2285480.
AVERAGE
235.
970.
862446.
54023.
163554.
TREATMENT
INTEREST
3519638.
TOTAL
12479.
51412.
45709616.
2863240.
8668369.
TOTAL
8668358
IBUTION OF OPERATION AND MAINTENANCE CCST
MINIMU"
703117.
103672.
57077 .
UU6.
2047 .
WER&GE
703117.
139494.
59578.
24835.
5442.
TOTHL
703117.
1255446.
119155.
720229.
65302.
D ISTR I9UTION OF INVESTMENT REQUIREMENTS
MXINHJV
14C76355.
3F52821 .
97601 5.
485911.
62579.
DISTR IBLTITN
*3* *4*
62°. 2913.
n. o.
217. 265.
3038. 6893.
231. 549.
MIN HUM
14C76355.
1052527.
540024.
10C866.
58998.
OF TOTAL CAPITAL CCST
*5# *6*
109. 1727.
16. 0 .
41. 440.
284. 14949.
37. 346.
AVERAGE
14076355.
2213683.
731121.
234507.
60788.
FCR TREATMENT ( $ 1000 '.
*7* *a*
60. 2345.
0. 20.
60. 289.
60. 13867.
0. 381.
TOTAL
14076355.
22136832 .
16815792.
3986611 .
121577.
*<;* *10*
6. 0.
3. 0.
5 . 0.
23. 0.
I. 0.
s.o.
35L.
2056.
15S9017.
103679.
304994.
S.D.
0.
45611.
3536.
8677.
1999.
S.D.
0.
958554.
138336.
129149.
2533.
NUMBER
1.
9.
2.
29.
12.
NUMBER
1.
10.
23.
17.
2.
4377.
0.
4377.
4377.
C.
*12*
0.
0.
0.
0.
0.
A VF
TOT
SD
OtSTRIBUTICN OF ANNUAL OEM TREATMENT COSTS ($ 1000)
*4# #5* *fc* *7* *8* *9*
?0.
0.
3C.
?0.
0 .
'. .
1 .
2 .
45.
r.
C7.
0.
26 .
367.
?.5.
90.
n.
13.
347.
18.
85.
3.
27.
ISfl.
38.
154.
0.
33 .
1 112 .
36.
5.
0.
5.
5.
0.
62 .
1 .
8.
368 .
U.
1.
0.
1.
4,
0.
*10*
0.
0.
C.
0.
0.
*ll*
3S8.
0.
398.
398.
0.
*12*
0.
0.
0.
0.
0.
SO OP S.D. RFPRESCNIS STANTARC TEVIATION.
THIf DATA OI STR I BUT ICN USED IS HIGHLY SKEWEC.
-------
IDAHO
PLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 53
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
2400.
5656.
6196045.
382099.
1168996.
MINIMUM
21.
9.
29579.
1251.
5008.
AVERAGE
235.
484.
556523.
32477.
103155.
TOTAL
12479.
25660.
29495696.
1721273.
5467229.
S.D.
351.
921.
922777.
58999.
175020.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1721273.
1474784.
2271167.
TOTAL
5467224.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
0. 0. 0.
382099. 170618. 276358.
90384. 73636. 80342.
43059. 10055. 18424.
8994. 1251. 5738.
MAXIMUM
7745056.
2763406.
905178.
490012.
82818.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
7745056.
1184150.
520038.
101129.
36974.
AVERAGE
7745056.
1910216.
697999.
289621.
62361.
TOTAL
0.
552717.
642732.
405334.
120494.
TOTAL
7745056.
13371517.
6979994.
8399009.
374165.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*4* *5* *6* *7* *8* *9*
247.
0.
247.
247.
0.
175.
6.
50.
1402.
51.
538.
0.
161.
2251.
190.
1220
0
132
3423
245
97.
13.
33.
230.
32.
1080.
0.
303.
10314.
246.
49.
0.
49.
49.
0.
1360.
12.
188.
9025.
238.
5.
3.
3.
17.
1.
*10*
0.
0.
0.
0.
0.
S.D.
0.
149540.
5056.
8871.
2881.
S.D.
0.
486226.
133442.
119129. .
19640.
NUMBER
0.
2.
8.
22.
21.
NUMBER
1.
7.
10.
29.
6.
*11*
2537.
0.
2537.
2537.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
24.
0.
24.
24.
0.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS <$ 1000)
*H* *5* *6* *7* *8* *9*
3.
0.
1.
37.
1.
70.
0.
17.
243.
25.
42.
0.
7.
182.
9.
65.
2.
18.
123.
26.
77
0
19
645
20
3.
0.
3.
3.
0.
30.
1.
5.
227.
6.
1.
0.
0.
2.
0.
*10*
0.
0.
0.
0.
0.
*11*
234.
0.
234.
234.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
IDAHO
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 53
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
2400,
4248.
5082060.
311832.
957253.
MINIMUM
21.
7.
25483.
1081.
4317.
AVERAGE
235.
344.
452622.
24412.
81895.
TOTAL
12479.
18256.
23988992.
1293845.
4340449.
S.D.
351.
661.
738586.
45306.
138540.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1293845.
1199449.
1847151.
TOTAL
4340445.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
j_j COST RANGE
OJ > 5000000.
CO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
0. 0. 0.
311832. 311832. 311832.
82270. 53030. 65654.
41362. 10061. 19620.
9183. 1081. 5756.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE
6352575. 6352575. 6352575.
1731346. 1442530. 1552809.
927860. 555142. 700835.
476222. 114676. 322054.
95501. 3'1854. 70212.
TOTAL
0.
311832.
459580.
372785.
149652.
TOTAL
6352575.
9316856.
4205008.
9339560.
772329.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
-93.
0.
93.
93.
0.
132.
4.
37.
1042.
37.
310.
0.
107.
1497.
112.
920.
0.
95.
2458.
182.
65.
11.
25.
177.
21.
922.
0.
266.
9036.
204.
45.
0.
45.
45.
0.
1131.
10.
157.
7519.
188.
4.
2.
3.
14.
1.
*10*
0.
0.
0.
0.
0.
S.D.
0.
0.
11771.
9692.
2904.
S.D.
0.
125508.
132343.
100942.
22686.
NUMBER
0.
1.
7.
19.
26.
NUMBER
1.
6.
6.
29.
11.
*11*
2110.
0.
2110.
2110.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
12.
0.
12.
12.
0.
2.
0.
1.
31.
1.
35.
0.
9.
131.
12.
32.
0.
5.
134.
7.
31.
2.
10.
73.
14.
60.
0.
15.
526.
16.
2.
0.
2.
2.
0.
24.
1.
4.
188.
4.
1.
0.
0.
2.
0.
*10*
0.
0.
0.
0.
0.
*11*
195.
0.
195.
195.
0.
*12*
0.
0.
0.
0.
0.
SD
OR S.t>.
SfjUSDARD
THE DATA DISTRIBUTION USED IS HIGHIY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PUNTS...
196«
951
ILLINCIS
FLOW AT nBSERVFC 1968 LEVEL
FLOW CTNOITIONS ( 1967 DOLLARS)
MANUFACTURING EMPLOYMENT
FLCW (I*GY1
TOTAL CAPITAL COST
TOT4L ANNUAL OEM COST
TOTAL ANNUAL CCST
MAXIMUM
20CCO.
47041.
45319376.
3548251.
9367310.
MINIMUM
5.
C.
?339.
304.
728.
AVEPASF
697.
479.
427168.
38501.
92757.
TOTHL
662976.
455108.
406236672.
36614064.
88211904.
S.O.
1587.
2222.
1968158.
162393.
406805.
ANNUAL COST OF V.AS1E
OEM REPLACEMENT
366140^4. 2C311824.
TREATMENT
INTEREST
312B0208.
TOT4L
88206096.
DISTRIBUTION OF OPERATICN AND MAINTENANCE CCST
COST RANGE
> 50000C.
100000. TO
*OOOG. TC
10000. TO
0. TO
500000.
ICOOOO.
5COOO.
10000.
CO COST RANGE
CO > 5000CCO.
1000000. TO 5000000.
5000CO. TO 1000000.
100000. TO 5COCOC.
0. TO 100000.
*1*
I"AX
3548251.
354642.
99775.
9955.
MAXIMUM
57P74208.
47631f3.
983634.
497594.
99947.
MINIMUM
62 1C 94.
10C704.
5C403.
10020.
304.
AVERAGE
1243618.
185095.
71010.
20953.
5451 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MIN I ^ UM
5044770.
103C945.
505399.
100118,
4174.
AVERAGE
15127644.
1983674.
701944.
216289.
70820.
DISTRIBUTION OF TOTAL C»PIT&L CCST FOR TREATMENT ($ 10CO)
TOTAL
13679802.
7773994.
4473608.
8297369.
2392838.
TOTAL
181531728.
128938832.
56857456.
125447888.
15084622.
*3*
*5*
*6*
*7*
*8*
*9*
M4X
M!N
AVF
TOT
SO
?2974.
0.
8S6.
73453.
3988.
1378.
0 .
27.
19093 .
77 .
504?.
0.
171 .
110531.
327.
4S43.
0.
61.
44149.
244.
1Z9.
5.
26.
2637.
24.
1335.
C.
15H .
•55459.
191.
41 .
0.
37.
183.
J.
1484 .
7.
139.
58941 .
208.
35
0
4
1355
4
*10*
0.
0.
c.
0.
0.
S.D.
85C086.
74362.
14757.
1C166.
2430.
S .0.
16510198.
9927S2.
133930.
97837.
21629.
NUMBER
11.
42.
63.
396.
439.
NUMBER
12.
65.
31.
580.
213.
*ll*
c.
0.
0.
0.
0.
*12*
16737.
0.
2698.
40476.
4120.
*2*
*3*
DISTRIBUTION OF ANNUAL 0£M TREATMENT CCSTS ($ 1000 )
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SO
74^.
0.
45.
3*S8 I .
105.
34 .
0.
1 .
824 .
? .
2256.
0.
28.
17845.
119.
421 .
0.
6.
4424.
21.
166.
1 .
15.
1495.
29.
LS7.
0.
12.
4358.
24.
3.
0.
2.
10.
0.
93.
1 .
5.
2083.
9 .
16
0
I
364
2
*10*
c.
0.
0.
c.
c.
* 11*
0.
0.
0 .
0.
0.
*12*
607.
0.
102.
1532.
149.
SD OP S.D. REPRESENTS ST4N0HRD DEVMTICN.
THE DVT1 DISTRIEUTICN USEC IS HIGHLY SKEWED.
-------
ILLINOIS
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 951
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
20000.
24526.
29435008.
1993897.
4949958.
MINIMUM
5.
0.
3339.
304.
728.
AVERAGE
697.
370.
342300.
30141.
73619.
TOTAL
662976.
352345.
325527296.
28663648.
70011280.
S.D.
1587.
1533.
1281037.
110362.
262960.
06M
28663648.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
16276363.
25065584.
TOTAL
70005584.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000,
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
*1*
*2*
MAXIMUM
1993897.
354642.
99528.
49121.
9819.
MAXIMUM
36793760.
4750880.
994699.
497849.
99897.
MINIMUM
507291.
100538.
50403.
10103.
304.
AVERAGE
947087.
169779.
70309.
20043.
5113.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5044770.
1003880.
508719.
100151.
4174.
AVERAGE
10721575.
1959947.
710217.
204967.
69302.
TOTAL
9470867.
6112043.
3726364.
6714246.
2643520.
TOTAL
117937328.
111717008.
49004992.
108632576.
19681840.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *u* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
11112.
0.
466.
38220.
1711.
847.
0.
21.
15143.
55.
3309.
0.
140.
90258.
250.
2601.
0.
45.
32681.
152.
129.
5.
25.
2557.
24.
1335.
C.
147.
51349.
187.
41.
0.
37.
183.
3.
1322.
7.
130.
55053.
194.
35.
0.
3.
1118.
U.
*10*
0.
0.
0.
0.
0.
S.D.
443339.
75814.
14975.
9937.
2296.
S.D.
10021066.
1014699.
148654.
95045.
21535.
NUMBER
10.
36.
53.
335.
517.
NUMBER
11.
57.
69.
530.
284.
*11*
0.
0.
0.
0.
0.
*12*
15949.
c.
2601.
39010.
3924.
MAX
HIM
AVE
TOT
SD
*1*
436.
0.
34.
2758.
69.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
21.
0.
1.
707.
1.
1251.
0.
20.
12880.
76.
234.
0.
5.
3293.
14.
161.
1.
14.
1417.
28.
197.
0.
11.
3938.
23.
3.
0.
2.
10.
0.
70.
1.
4.
1906.
7.
13.
0.
1.
278.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
580.
0.
99.
1479.
142.
SD OR'S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
.ILLINOIS
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 951
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
20000.
17080.
19877504.
1449448.
3426147.
MINIMUM
5.
0.
2673.
283.
622.
AVERAGE
697.
263.
270362.
22692.
57027.
TOTAL
662976.
250449.
257113824.
21579664.
54232288.
S.D.
1587.
979.
886382.
78020.
184383.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
21579664.
12855690.
19797744.
TOTAL
54233088.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE TOTAL
1449448. 534242. 775217. 5426516.
370359. 106490. 187658. 4879103.
99528. 50403. 72114. 3028769.
49688. 10064. 19862. 5243623.
9993. 283. 4910. 3004805.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE TOTAL
24846880. 5116908. 10472565. 62835392.
4423065. 1030344. 2037313. 101865696.
983634. 506635. 697082. 41127840.
493243. 100162. 194924. 90639712.
99465. 3342. " 67188. 24926928.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *(f* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
6066.
0.
276.
22618.
947.
647.
0.
17.
11777.
43.
2622.
0.
112.
72158.
191.
1821.
0.
33.
23666.
104.
91.
5.
20.
1993.
16.
1335.
0.
134.
46732.
181.
39.
0.
34.
168.
4,
1126.
6.
107.
45536.
156.
23.
0.
2.
901.
3.
*10*
0.
0.
0.
0.
0.
S.D.
323377.
77331.
13980.
9657.
2409.
S.D.
7865074.
977955.
155838.
88206.
22138.
*11*
0.
0.
0.
0.
0.
NUMBER
7.
26.
42.
264.
612.
NUMBER
6.
50.
59.
465.
371.
*12*
11988.
0.
2104.
31560.
2957.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*[)* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
324.
0.
25.
2057.
52.
16.
0.
1.
613.
1.
902.
0.
14.
9123.
52.
169.
0.
3.
2451.
10.
84.
1.
8.
834.
14.
197
0
10
3527
22
2.
0.
2.
8.
0.
44.
1.
4.
1554.
6.
7.
0.
1.
206.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
439.
0.
81.
1208.
108.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUNBER CF MANUFJCTUP INC PLAMTS...
INDIANA
FLOW AT OBSERVEC 1968 LEVEL
1968 FLOW CONDITIONS I 1967 CCLLARS)
515
MANUFACTURING FMPICYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNlAt. 0£M COST
TOTSL 4NNU4L COST
COST R4NGE
> 500000.
100000. TO
•50000. TO
IOOOC. TO
O. TO
sccoor.
ICOOOC.
50000.
10000.
«N COST R4NGE
l\3 > 5000000.
ICCOOCO. TO 5COOCOO.
50000". TO 10COOOO.
100000. TO 500000.
0. TO ICOCOO.
MAX
HIM
AVF
TOT
SO
*1*
127753.
0.
868*3.
266718.
28270.
*2*
2354.
1 .
38 .
14827.
183.
VAX f MUM
20500.
S6435.
15053
-------
INDIANA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 515
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
^_4 COST RANGE
tfS > 5000000.
CO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
37230.
0.
2814.
92867.
8336.
*2*
1448.
0.
27.
10621.
115.
MAXIMUM
20500.
50279.
50768256.
3813776.
10261343.
O6M
21949936.
MINIMUM
11.
2.
9206.
600.
1769.
ANNUAL COST OF WASTE
REPLACEMENT
13182389.
DISTRIBUTION OF OPERATION
MAXIMUM
3813776.
269957.
97150.
49894.
9994.
MINIMUM
666754.
106126.
53231.
10044.
600.
AVERAGE
863.
498.
511937.
42621.
107638.
TREATMENT
INTEREST
20300864.
AND MAINTENANCE COST
AVERAGE
1835718.
160004.
75439.
20509.
5532.
TOTAL
444594.
256386.
263647808.
21949936.
55433664.
TOTAL
55433184
TOTAL
12850031.
2240052.
1433335.
3835232.
1593243.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
63460320.
4832921.
927960.
488730.
99985.
DISTRIBUTION
*3* *4*
5265. 5278.
0. 0.
152. 63.
56988. 26446.
443. 385.
MINIMUM
5239353.
1052456.
511165.
100205.
11508.
AVERAGE
24304336.
1889197.
691949.
200115.
70752.
TOTAL
194434720.
39673152.
24218208.
60835088.
10400600.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
105. 836.
6. 0.
24. 116.
820. 23917.
19. 116.
*7* *8*
40. 1548.
0. 8.
32. 114.
192. 23255.
4. 192.
*9* *10*
28. 4394.
0. 0.
3. 4394.
639. 4394.
3. 0.
S.D.
1983.
3329.
3217268.
256794.
661466.
S.D.
1331196.
50122.
13093.
10195.
2341.
S.D.
22901088.
1000358.
133596.
93195.
21757.
NUMBER
7.
14.
19.
187.
288.
NUMBER
8.
21.
35.
304.
147.
*11*
0.
0.
0.
0.
0.
*12*
13012.
0.
2938.
23505.
4150.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*!»* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
797.
0.
92.
3035.
197.
36.
0.
1.
463.
3.
2428.
0.
31.
11763.
188.
452.
0.
6.
2671.
34.
87.
1.
11.
380.
16.
153
0
8
1640
14
2.
0.
2.
10.
0.
100.
1.
4.
904.
10.
10.
0.
1.
176.
1.
*10*
8.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
482.
0.
113.
902.
152.
SD
OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
INDIANA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
_„, 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 515
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
19443.
0.
1512.
49898.
4377.
*2*
1105.
0.
22.
8387.
88.
MAXIMUM
20500.
35015.
29633344.
2767396.
6530829.
OSM
16775539.
MINIMUM
11.
1.
7416.
502.
1444.
ANNUAL COST OF WASTE
REPLACEMENT
9531605.
AVERAGE
863.
366.
370159,
32574.
79581.
TREATMENT
INTEREST
14678666.
TOTAL
444594.
188724.
190632128.
16775539.
40984416.
TOTAL
40985792
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
2767396.
486345.
90298.
48476.
9964.
MINIMUM
511689.
105725.
50885.
10039.
502.
AVERAGE
1493606.
160666.
73731.
20241.
4953.
TOTAL
8961636.
1927994.
1032230.
3258777.
1594980.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
37041680.
4167848.
987378.
487439.
99775.
DISTRIBUTION
*3* *4*
4164. 3695.
0. 0.
124. 46.
46515. 19239.
352. 272.
MINIMUM
5202102.
1047981.
511165.
100077.
9270.
OF TOTAL CAPITAL COST
*5* *6*
70. 741.
6. 0.
22. 108.
762. 22232.
15. 111.
AVERAGE
19127696.
1905564.
709644.
197662.
67166.
FOR TREATMENT <$ 1000)
*7* *8*
36. 1227.
0. 8.
31. 102.
189. 20767.
3. 155.
TOTAL
114766240.
38111280.
19870032.
52380304.
13164622.
*9* *10*
28. 3527.
0. 0.
2. 3527.
519. 3527.
3. 0.
S.D.
1983.
2337.
1948985.
187291.
431649.
S.D. NUMBER
958100. 6.
105778. 12.
12158. 14.
10368. 161.
2230. 322.
S.D.
13018706.
959115.
144617.
92900.
20985.
*11*
0.
0.
0.
0.
0.
NUMBER
6.
20.
28.
265.
196.
*12*
9780.
0.
2325.
18597.
3071.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
592.
0.
69.
2271.
146.
27.
0.
1.
397.
2.
1749.
0.
23.
8664.
136.
327.
0.
5.
2002.
25.
42.
1.
9.
314.
10.
127
0
7
1479
12
2.
0.
2.
9.
0.
72.
1.
4.
778.
8.
10.
0.
1.
133.
1.
*10*
7.
0.
7.
7.
0.
*11*
0.
0.
0.
0.
0.
*12*
365.
0.
90.
721.
113.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL MUMPER OF MANUFACTUP INC7 PLANTS...
1968
Fl OW
FLOW
[OV»A
AT ORSEPVEC
CONDITICNS (
1968 LEVEL
1967 CCLL 4RS »
MANUFACTURING EMPLOYMENT
Ft OW ( MO,Y>
TOTAL CAPITAL COST
TOTAL ANNLAL CGM COST
TOTiL INNUiL COST
MAXIMUM
1 1 500,
7443.
MINIMUM
AVERAGE
^86960.
922048.
4.
25344.
1345.
4923.
317.
270757.
22352.
56738.
TOTAL
I 12959.
59368.
50631488.
417S788.
10610085.
s.o.
1225.
705.
455502.
38091.
S4172.
ANNUHL COST OF W&STE TREATMENT
REPLACEMENT INTEREST
41
2531574,
3898622.
TOTAL
10609984.
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
COST R1NCF
> 500000.
tooorc. TO
5COOO. TO
10000. TO
0. TO
500000.
100000.
50000 .
10000.
UN COST R4NGE
«J1 > 5000010.
10COOOO. TO 5000000.
5000CO. TM 1CCCOOO.
100000. TO 500000.
o. Tr icoooo.
MXI MUM
n.
386T60.
48C46.
S362 .
I»AXI
3*17505.
930334.
MINIMU>"
C.
11 1458,
50201,
I CO 1 1.
1345 ,
IVERAGt
0.
156646.
64518.
21991.
4544,
DISTRIBUTION' OF INVESTMENT REQUIREMENTS
MINIMUM !^VER1GE
5266.S15. 5266615.
1009335. 1562841.
518644. 732227.
101375. 234382.
51680. 65151.
DISTRIBUTION OF TOTAL CAPITAL CCST ECR TREATMENT ($ 1000
'f * 4 * * 5 $ #6* * 7 * *8*
TOTAL
0.
1253171.
903247.
1605376.
418040.
TOT4L
5266615.
21879776.
3054495.
24375680.
3713621.
s.o.
0.
93612.
14363.
9821.
2460.
S.D.
0.
713973.
155754.
100542.
21206.
NUMBER
0.
8.
14.
73.
92.
NUMBER
1.
14.
11.
104.
57.
*10*
*11*
*12*
MAX
MIN
4V F
TOT
SO
733.
0.
???.
^P7.
345.
347.
0.
33 .
3POP .
c'4.
8R9 .
r.
1 12.
12447.
l?4.
7C4.
r> .
44.
'+ ) 5 3 .
9f> .
137.
3.
35.
1260.
25.
sea.
217
41.
0 .
39.
79.
2 .
1433.
7.
147,
17230.
217,
37.
0.
7.
503.
8.
0.
0.
0.
0.
C.
0.
0.
0.
0.
C.
0.
0.
0.
0.
0.
RISIRieUTICN OH ANNUAL C£M TRESTHEKT COSTS ($ 1000)
*4* *•=>* *f« *7* * 8*
no*
*u*
*12*
M !U
MIM
AVF
TOT
sn
23.
01
1?.
192.
6.
1 46.
0.
21 .
765.
86 .
u.
14 .
763.
18.
3.
0.
3.
5 .
0.
46 ,
I .
5.
553 .
7.
14,
0.
2.
146,
3,
C.
0.
C.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
SO OR S.C. PfPRESEfvTS STANTAKT CFV1ATI".N.
THE DATA OISTSIBlllCX LSEO IS HIGHLY SKEWED.
-------
IOWA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
TOTAL NUMBER OF MANUFACTURE PLANTS... 18T ™ C°ND™S ( »" D°LLARS>
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOTAL ANNUAL COST
MAXIMUM
11500.
7443.
4213292.
386960.
922048.
MINIMUM
9.
4.
19440.
1196.
3665.
AVERAGE
604.
265.
239779.
19195.
49647.
TOTAL
112959.
49597.
44838624.
3589417.
9284000.
S.D.
1225.
660.
437889.
36004.
90046.
06M
ANNUAL COST'OF WASTE TREATMENT
REPLACEMENT INTEREST
3589417.
2241931.
3452572.
TOTAL
9283920.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
,_, COST RANGE
^ > 5000000.
O5 1000000. TO 5000000,
500000. TO 1000000,
100000. TO 500000,
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
*1*
*2*
MAXIMUM
0.
386960.
89676.
47866.
9766.
MAXIMUM
5266615.
3517505.
968058.
499856.
99722.
MINIMUM
0.
100160.
50727.
10205.
1196.
AVERAGE
0.
162269.
66358.
21260.
4480.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5266615. 5266615.
1005819. 1610044.
516093. 728126.
100437. 219101.
24300. 64734.
TOTAL
0.
973611.
729939.
1424439.
461463.
TOTAL
5266615.
16100441.
9465632.
20814560.
4401936.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *«* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD.
733.
0.
221.
883.
345.
331.
0.
29.
3275.
51.
889.
0.
102.
11269.
120.
754.
0.
38.
3555.
94.
137.
3.
31.
1115.
24.
968.
0.
173.
9363.
207.
41.
0.
39.
79.
2.
1433.
7.
127.
14891.
199.
30.
0.
6.
409.
6.
*10*
0.
0.
0.
0.
0.
S.D.
0.
111046.
13599.
10365.
2493.
S.D.
0.
812584.
169239.
93012.
20984.
NUMBER
0.
6.
11.
67.
103.
NUMBER
1.
10.
13.
95.
68.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
54.
0.
23.
91.
25.
5.
0.
1.
124.
1.
99.
0.
10.
1159.
16.
38.
0.
4.
339.
5.
146.
0.
18.
633.
26.
82
0
12
655
17
3.
0.
3.
5.
0.
46.
1.
4.
473.
6.
11.
0.
2.
112.
2.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
IOWA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 187
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
11500.
3386.
2264601.
199193.
486797.
MINIMUM
9.
4.
16776.
1018,
3149.
AVERAGE
604.
189.
191173.
14811.
39091.
TOTAL
112959.
35252.
35749264.
2769738.
7309948.
S.D.
1225.
377.
290067.
23299.
58608.
O£M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
2769738.
1787463.
2752691.
TOTAL
730989-2.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000'.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
0.
199193.
97056.
45604.
9883.
MAXIMUM
0.
2830751.
978959.
492736.
98312.
MINIMUM
0.
110079.
52632.
10044.
1018.
AVERAGE
0.
154636.
68814.
20134.
4335.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1118142.
533913.
100410.
20970.
AVERAGE
0.
1806214.
771348.
208282.
61633.
TOTAL
0.
309272.
825767.
1127497.
507242.
TOTAL
0.
10837288.
10798877.
18120512.
4930671.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *n* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
267.
0.
99.
397.
121.
276.
0.
22.
2537.
38.
543.
0.
85.
9464.
92.
347.
0.
26.
2447.
49.
96.
3.
26.
948.
19.
780
0
144
7783
164
38.
0.
37.
75.
1.
864.
7.
100.
11758.
144.
25.
0.
5.
341.
5.
*10*
0.
o,
0.
0.
0.
*11*
0.
0.
0.
0.
0.
S.D.
0.
63013.
16603.
9214.
2582.
S.D.
0.
643382.
157727.
91493.
21696.
NUMBER
0.
2.
12.
56.
117.
NUMBER
0.
6.
14.
87.
80.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6K TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
28.
0.
15.
61.
15.
5.
0.
1.
108.
1.
70.
0.
8.
918.
13.
20.
0.
3.
262.
4.
76.
0.
13.
457.
16.
67
0
9
500
13
3.
0.
2.
5,
0.
24.
1.
3.
372.
4.
8.
0.
1.
88.
2.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD' DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MINUFACTUPINC PLANTS...
K4NS 'S
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( IS67 DOLLARS)
110
ING EMPinY'
-------
KANSAS
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 110
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OgM COST
TOTAL ANNUAL COST
MAXIMUM
15000.
1763.
2134905.
128528.
399661.
MINIMUM
16.
4.
15855.
986.
2999.
AVERAGE
577.
192.
251179.
19058.
50958.
TOTAL
'21081*.
27629696.
2096402.
5605412.
S.D.
1708.
296.
380695.
25488.
72165.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
2096402.
13811*84.
21271*85.
TOTAL
5605371.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
i_j COST RANGE
UN > 5000000.
(£> 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
0. 0. 0.
128528. 1091*77. 117182.
85678. 53467. 73461.
46868. 10510. 24571.
9842. 986. 5247.
MAXIMUM
0.
2668631.
986690.
434006.
96961.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1121717.
508609.
101635.
19818.
AVERAGE
0.
1766053.
718054.
203296.
69245.
TOTAL
0.
351546.
587687.
810859.
346332.
TOTAL
0.
14128424.
6462485.
11384587.
2562067.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
196.
0.
65.
1039.
61.
67.
1 .
11.
754.
12.
394.
0.
103.
6715.
77.
114.
0.
19.
1372.
24.
46.
7.
18.
373.
12.
481.
0.
103.
3413.
107.
41.
0.
40.
81.
2.
352.
12.
65.
3626.
70.
11.
0.
3.
85.
3.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
S.D.
0.
10034.
1089-5.
10146.
2267.
S.D.
0.
606700.
194117.
100119.
19806.
*12*
1632.
0.
782.
10172.
476.
NUMBER
0.
3.
8.
33.
66.
NUMBER
0.
8.
9.
56.
37.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* +8* *9*
MAX
MIN
AVE
TOT
SD
31.
0.
12.
189.
10.
2.
0.
1.
48.
0.
73.
0.
11.
704.
13.
11.
0.
2.
167.
2.
47.
1.
9.
179.
12.
49
0
7
220
9
3.
0.
3.
6.
0.
12.
1.
2.
129.
2.
3.
0.
1.
19.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
69.
0.
33.
435.
20.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
KANSAS
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 110
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL"ANNUAL COST
MAXIMUM
15000.
1187.
2134905.
128528,
399661.
MINIMUM
16.
4.
15855.
986.
2999.
AVERAGE
577.
115.
226429.
15868.
41625.
TOTAL
63445.
15941.
24907216.
1745461.
4908708.
S.D.
1708.
214.
371294.
22788.
69258.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1745461.
1245360.
1917854.
TOTAL
4908675.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
0.
128528.
79218.
48426.
9720.
MAXIMUM
0.
2668631.
986690.
428768.
97559.
MINIMUM
0.
109477.
53467.
10393.
986.
AVERAGE
0.
117182.
62231.
23866.
4830.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1048803.
508609.
100411.
19818.
AVERAGE
0.
1695682.
731748.
192135.
68601.
TOTAL
0.
351546.
311157.
739841.
342937.
TOTAL
0.
13565459.
5122234.
9222471.
3224251.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
10.
0.
3.
77.
2.
MAX
MIN
AVE
TOT
SD
196.
0.
63.
1004.
60.
62.
1.
10.
650.
11.
245.
0.
86.
5587.
57.
95.
0.
14.
1033.
18.
38.
5.
16.
331.
10.
433.
0.
93.
3054.
97.
37.
0.
36.
73.
1.
311
11
57
3190
63
*10*
0.
0.
0.
0.
0.
S.D.
0.
10034.
9872.
10793.
2218.
S.D.
0.
646379.
188927.
91120.
20113.
*11*
0.
0.
0.
0.
0.
NUMBER
0.
3.
5.
31.
71.
NUMBER
0.
8.
7.
48.
47.
*12*
1632.
0.
762.
9908.
469.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*H* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
31.
0.
11.
183.
10.
1.
0.
1.
44.
0.
29.
0.
8.
506.
7.
8.
0.
2.
126.
2.
33.
1.
7.
139.
9.
42
0
6
187
8
3.
0.
3.
5.
0.
10.
1.
2.
114.
2.
3.
0.
1.
17.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
69.
0.
33.
425.
20.
SD OR S.D.' REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER TF MANLIFACTUR INC PLANTS
196P
208
KFNTLCKV
FLOW 4T OBSERVEC 1968 LEVEL
FLOW CONOITICNS ( 1567 DCLLARS)
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OCM COST
TOTAL ANNUAL CCST
MAXIMUM
lonoo.
24191.
67004336.
19C9998.
10419546.
MINIMUM
15.
5.
19028.
852.
326S.
AVERAGE
500.
3P7.
620664.
31605.
110427.
TOTAL
103996.
80420.
129098064.
6573752.
22968768.
S.O.
987.
1910.
4705274.
151313.
7404S6.
4NNUAL COST OF t»ASTE
OEM REPLACEMENT
6573757. 6454902.
TREATMENT
INTEREST
9940546.
TOTAL
229692CO.
DISTRIBUTION OF QPFR4TICIV UNO MAINTENANCE COST
tn
COST RANC-F
> 50COCC.
100000. TO
50000. TO
looon. TO
0. TO
5COOOO.
100000 .
50000.
10000.
COST RANGF
> 5000000.
IOOOOCO. TO 5COOOOO.
500000. TO 1000000.
100000. TO 500000.
0. TO 1COOOO.
MAX
MIN
AVE
TOT
SO
MAXIMUM
1909998.
409570.
98149.
46055.
c-659.
XI MUM
83755408.
4697895.
82C315.
474888.
99557.
M.I NI MUM
914536.
121019.
513C5.
10051.
852 .
AVERAGE
1412267.
249092.
67681.
20497.
3964.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
8902306.
1092871.
517231.
IOC153.
23735.
AVtRAGE
34431808.
2291284.
6'+7892 .
225807.
60812.
TOTAL
2824534.
1245461.
812175 .
1168335.
523283.
TOTAL
103295456.
22912848.
8422600 .
21451648.
5290651.
*1*
36891.
0.
2371 .
42682.
8649.
*2*
45°.
25 .
3505.
62.
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TREATMEMT ($ 1000)
* 3* *4* *5* *6* *7* *8* *9*
2325.
0.
144.
2 05 74 .
27C.
11 80.
0.
55.
7100.
157.
55.
8.
22.
400.
12.
1221.
0.
I 13.
9278.
169.
34.
0.
34.
34.
0.
1019.
a.
79.
9784.
133 .
10.
1.
3.
137.
2.
*10*
0.
2519.
2519.
0.
S.D.
703897.
125078.
14794.
10053.
2539.
S.O.
42724272.
127C85C.
101028.
104678.
22530.
0.
0.
0.
0.
0.
NUMBER
2.
5.
12.
57.
132.
NUMBER
3.
10.
13.
95.
87.
*12*
26321.
0.
1 1029.
33086.
13490.
DISTRIBUTION OF UNNU6L C6M TREATMENT CCSTS ($ 1000)
MAX
MIN
4V E
TOT
SO
48?.
0.
55.
992 .
119.
*2*
11 .
0 .
1 ,
131 ,
1 .
564.
0 .
19.
276^.
65.
1C6.
0 .
5.
591.
12.
33.
2.
8.
145.
8 .
1 CC.
0.
6.
5C4.
13.
2.
0.
2.
2.
0.
25.
1.
2 .
291.
4.
*S*
3.
0.
1.
31 .
1.
*10*
5.
0.
5.
5.
C.
*11*
0.
0.
0.
0 .
0.
*12*
881.
0.
373.
1118.
449.
SO OR S.O. REPRESENTS STANDARD CEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
KENTUCKY
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
TOTAL NUMBER OF MANUFACTURING PLANTS... 2oT ™ CONDI™S < "« COLLARS)
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*2*
MAXIMUM
10000.
2U191.
67004336.
1909998.
101*19546.
O6M
6268607.
MINIMUM
15.
5.
19028.
852.
3269.
ANNUAL COST OF WASTE
REPLACEMENT
6308219.
DISTRIBUTION OF OPERATION
MAXIMUM
1909998.
409570.
981U9.
49985.
9659.
MINIMUM
914536.
172975.
51805.
10051.
852.
AVERAGE
500.
368.
606560.
30138.
107168.
TREATMENT
INTEREST
9714654.
AND MAINTENANCE COST
AVERAGE
1412267.
281111.
69277.
20179.
3891.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
83755H08.
K697895.
820315.
468381*.
99557.
MINIMUM
8902306.
1092871.
517233.
101648.
23785.
AVERAGE
34431808.
2215697.
644078.
215281.
59982.
TOTAL
103996.
76480.
126164400.
6268607.
22290976.
TOTAL
22291472.
TOTAL
2824534.
1124443.
762050.
1008961.
548663.
TOTAL
103295456.
22156976.
7084855.
19590608.
5578295.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6* *7* *8* *9*
*10*
MAX
MIN
AVE
TOT
SD
36891.
0.
2370.
42664.
8649.
459.
1.
23.
3253.
62.
2325.
0.
134.
19117.
278.
1180.
0.
51.
6553.
156.
55.
8.
22.
400.
12.
1221
0
108
8838
162
34.
0.
34.
34;
0.
1019.
8.
77.
9588.
128.
10.
1.
2.
113.
2.
2519
0
2519
2519
0
S.D.
987.
1908.
4705349.
151282.
740518.
S.D.
703897.
118425.
15943.
10204.
2419.
S.D.
42724272.
1255038.
111886.
101037.
21896.
NUMBER
2.
4.
11.
50.
141.
NUMBER
3.
10.
11.
91.
93.
*11*
0.
0.
0.
0.
0.
*12*
26321.
0.
11029.
33086.
13490.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *b* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
482.
0.
55.
987.
119.
11.
0.
1.
123.
1.
564.
0.
18.
2578.
65.
106.
0.
4.
538.
12.
33.
2.
8.
145.
8.
100.
0.
6.
464.
13.
2.
0.
2.
2.
0.
25.
1.
2.
285.
3.
2.
0.
0.
23.
1.
*10*
5.
0.
5.
5.
0.
*11*
0.
0.
0.
0.
0.
*12*
881.
0.
373.
1118.
449.
SI> OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
KENTUCKY
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS 208
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
10000.
23582.
64726384.
1870653.
10090902.
MINIMUM
15.
5.
19028.
852.
3269.
AVERAGE
500.
322.
565138.
26878.
986<48.
TOTAL
103996.
66901.
117518672.
5590622.
20518864.
S.D.
987.
1764.
4532388.
141287.
711862.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
5590622.
5877433.
9051243.
TOTAL
20519296.
DISTRIBUTION OF OPERATION AND MAINTENANCE'COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000,
10000.
MAXIMUM
1870653.
401225.
98149.
46574.
9659.
MINIMUM
666114.
126765.
53069.
10051.
852.
AVERAGE
1268383.
240189.
65054.
20849.
3682.
TOTAL
2536767.
960758.
520435.
1042471.
530235.
S.D.
851738.
120362.
14324.
10520.
2282.
NUMBER
2.
4.
8.
50.
144.
cn
CO
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
*1*
*2*
MAXIMUM
80907968.
4413778.
946023.
454966.
99835.
MINIMUM
6109412.
1092871.
517233.
102898.
23785.
AVERAGE
32471008.
2013381.
681720.
219116.
60590.
TOTAL
97413024.
18120432.
6817201.
18405744.
6180203.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *u* *5* *6* *7* *8* *9*
*10*
MAX
MIN
AVE
TOT
SD
35206.
0.
2185.
39322.
8257.
412.
1.
20.
2882.
54.
2288.
0.
121.
17358.
252.
1021.
0.
44.
5571.
131.
45.
8.
22.
391.
11.
1161.
0.
103.
8451.
152.
34.
0.
34.
34.
0.
961.
8.
72.
8985.
116.
10.
1.
2.
102.
2.
2022.
0.
2022.
2022.
0.
S.D.
42002304.
1116244.
143171.
98591.
22869.
*11*
0.
0.
0.
0.
0.
NUMBER
3.
9.
10.
84.
102.
*12*
25800.
0.
10810.
32430.
13222.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
472.
0.
49.
882.
114.
9.
0.
1.
114.
1.
467.
0.
15.
2186.
54.
76.
0.
4.
455.
9.
24.
2.
8.
135.
6.
93.
0.
5.
431.
11.
2.
0.
2.
2.
0.
21.
1.
2.
265.
3.
2.
0.
0.
20.
0.
*10*
4.
0.
4.
4.
0.
*11*
0.
0.
0.
0.
0.
*12*
864.
0.
365.
1096.
440.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
LOU1 SI AM
TPTM NUMBER OF
MANUFACTURING EMPLOYMENT
FLOW (M<-, Y)
TPT1L C\PIT6L COST
TOTAL ANMJAl OEM
TOTAL ANNUAl COST
COST RANGF
> 500000.
IOOOCO. TO
•50000. TO
loooo. tn
0. TO
5CCOOO.
1COOOO.
50000.
10000.
(J\ CPST RANGF.
rfN > 50CCCOC.
loooroo. TO 5000010.
50COCC, TC 100000P.
IOOPOO. TP ^COOOO.
0. TP LOOOOO.
MAX
'•UN
(WE
TOT
SO
*l*
13152.
o.
1729.
62255.
4641.
*?*
1146 .
I .
1 10.
16687 .
202.
R INT PI ANTS.. .
"4XIMUM
= 200.
1C7879.
45535F56.
3247403.
9030455.
061
26323296.
DISTR
MlXIiV.UM
3247403.
469985.
3S383.
46073.
989?. •
FLOW AT OBSERVED
1968 FLOW CONDITIONS (
238
MINIMUM
6.
11.
27913.
1354.
4921.
ANNUAL COST OF HASTE
REPLACEMENT
1940R688.
1968 LEVEL
1967 COLLARS)
AVERAGE
357.
2068.
1630982.
I 10602.
317739.
TREATMENT
INTEREST
29889 36C.
TOTAL
84850.
492263.
338173824.
26323296.
75621904.
TOTAL
75621344,
IBUTION OF OPERATION AND MAINTENANCE CCST
MINIMUM
509459.
103202.
53058.
1C004.
1354 .
4V ER^GE
1160530 .
221267.
72657 .
2 1912.
5159.
TOT4L
12765832.
9735755.
2034385.
1292820.
495290.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
fAX 1MUM
569198C3.
4989713.
091593.
4693 <-4.
995 10.
DISTRIBUTION
*3* *4*
27f4. 16877.
0. 0.
294. 363.
35339. 6 8529.
425. 1492.
MINIMUM
5584322 .
100 1878.
510403.
100121.
34891.
OF TOTAL CAPITAL CCST
*5* *6*
295. 4678.
4. 0 .
41. 535.
1513. 62588.
55. 754.
AVERAGE
18241184.
2133716.
68 1668 .
218184.
73952.
FCR TREATMENT ( $ 1000 1
*7* *8* *
53. 7664.
0. 12.
50. 354.
151. 56979.
4. 794.
TOTHL
328341504.
115220672.
18405C40.
19636576.
3623662.
*«# *IQ*
5. 6946.
1. 0.
2. 6946.
71. 6946.
1. 0.
s.o.
624.
8199.
5217849.
301816.
95227C.
S.D.
824924.
111781.
13264.
9958.
2032.
S.D.
16745457.
980283.
156118.
90261.
1980S.
NUMBER
11.
44.
28.
59.
96.
NUMBER
16.
54.
27.
90.
49.
*11*
14316.
0.
14316.
14316.
0.
*12*
18444.
0.
4486.
62805.
6626.
*1*
*2*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
4VE
TOT
SO
V4.
0.
48.
1726.
97.
16.
0 .
2 .
335.
3 .
515.
0.
49.
5R54.
91 .
566.
0.
18.
3375.
49.
658.
1.
44.
1637.
113.
827
C
64
7456
124
*10*
*12*
6.
0.
5.
15.
1.
435.
1 .
13.
2091 .
4L.
1.
0.
0.
14.
0.
11.
0.
11.
11.
0.
1420.
0.
1420.
1420.
0.
678.
0.
171.
2391.
248.
SO
S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
LOUISIANA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATEH USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 238
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
y«t COST RANGE
Ol > 5000000.
O1 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
5200.
56563.
29376864.
1977976.
5506287.
OSM
17209072.
MINIMUM
6.
6.
19180.
1204.
3640.
ANNUAL COST OF WASTE
REPLACEMENT
13047491.
DISTRIBUTION OF OPERATION
MAXIMUM
1977976.
459345.
95505.
49440.
9993.
MINIMUM
584607.
102396.
50024.
10004.
1204.
AVERAGE
357.
1195.
1096427.
72307.
211549.
TREATMENT
INTEREST
20093120.
AND MAINTENANCE COST
AVERAGE
981480.
208388.
69421.
20807.
4625.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
36721072.
4989713.
991593.
480902.
97001.
MINIMUM
5109412.
1022953.
517203.
101174.
23975.
AVERAGE
13152925.
2052620.
753335.
224308.
64609.
TOTAL
8H850.
284373.
260949840.
17209072.
50348752.
TOTAL
50349680.
TOTAL
6870359.
6251633.
2221476.
1394088.
471778.
TOTAL
197293888.
84157456.
18080032.
23103712.
3553507.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
*10*
MAX
MIN
AVE
TOT
SD
11879.
0.
728.
26194.
2231.
1045.
1.
81.
12371.
162.
1609.
0.
180.
21564.
258.
9994
0
231
43721
848
202.
4.
27.
999.
36.
3273.
0.
454.
53142.
626.
38.
0.
36.
107.
3.
5062.
11.
262.
42174.
535.
S.D.
624.
4387.
3220046.
192637.
595315.
S.D.
482102.
117465.
13988.
10105.
2135.
S.D.
10221158.
943913.
171052.
100274.
21331.
NUMBER
7.
30.
32.
67.
102.
NUMBER
15.
41.
24.
103.
55.
*11*
*12*
4.
0.
2.
56.
1.
6946.
0.
6946.
6946.
0.
9453.
0.
9453.
9453.
0.
15244.
0.
3159.
44222.
4682.
*T*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*U* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
298.
0.
30.
1086.
65.
15.
0.
2.
265.
2.
282.
0.
24.
2883.
47.
317.
0.
12.
2239.
31.
328.
1.
20.
737.
56.
525
0
51
5933
97
2.
0.
2.
6.
0.
228.
1.
9.
1393.
22.
1.
0.
0.
10.
0.
*10*
11.
0.
11.
11.
0.
*11*
947.
0.
947.
947.
0.
*12*
563.
0.
121.
1698.
175.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
LOUISIANA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
TOTAL NUMBER OF MANUFACTURING PLANTS... 238° "^ C°TOITIONS <
MANUFACTURING EMPLOYMENT
FLOW 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
y_l COST RANGE
cn > 5000000.
O» 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
5200.
42476.
22401616.
1592842.
4437846.
06M
12756786.
MINIMUM
6.
2.
10959.
660.
2052.
ANNUAL COST OF WASTE
REPLACEMENT
9938577,
DISTRIBUTION OF OPERATION
MAXIMUM
1592842.
477963.
99285.
49969.
9882.
MINIMUM
618482.
113495.
51885.
10095.
660.
AVERAGE
357.
834.
835175.
53600.
159665.
TREATMENT
INTEREST
15305403.
AND MAINTENANCE COST
AVERAGE
929362.
266210.
72492.
23892.
4463.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
28002016.
4734063.
991593.
488667.
97844.
MINIMUM
5150211.
1045886.
500719.
100932.
13699.
AVERAGE
11148329.
2031214.
693293.
218546.
59778.
TOTAL
84850.
198386.
198771568.
12756786.
38000160.
TOTAL
38000752.
TOTAL
3717446.
5057999.
1667321.
1791902.
522175.
TOTAL
133779952.
75154944.
12479270.
23165824.
3885576.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6* *7* *8* *9*
*10*
MAX
MIN
AVE
TOT
SD
6429.
0.
376.
13535.
1195.
873.
1.
64.
9697.
133.
1164.
0.
125.
15037.
179.
7536
0
171
32260
642
135.
3.
20.
727.
24.
2793.
0.
395.
46260.
546.
34.
0.
32.
97.
3.
4210.
8.
211.
34045.
432.
S.D.
624.
3187.
2371032.
148028.
445971.
S.D.
459047.
120310.
14627.
12514.
2400.
S.D.
7649428.
1027150.
155155.
103726.
23723.
NUMBER
4.
19.
23.
75.
117.
NUMBER
12.
37.
18.
106.
65.
*11*
*12*
3.
0.
1.
46.
1.
5668.
0.
5668.
5668.
0.
7862.
0.
7862.
7862.
0.
11458.
0.
2395.
33536.
3506.
MAX
MIN
AVE
TOT
SD
*2*
*3*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
221.
0.
21.
752.
47.
12.
0.
1.
220.
2.
204.
0.
14.
1702.
29.
245
0
9
1665
24
158.
0.
10.
384.
27.
431.
0.
41.
4848.
79.
2.
0.
2.
5.
0.
173.
1.
7.
1074.
16.
1.
0.
0.
8.
0.
*10*
9.
0.
9.
9.
0.
*11*
791.
0.
791.
791.
0.
*12*
427.
0.
93.
1299.
132.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBFP Of MANUFACTURING PL'VNTS...
FLOW AT 'TBSERVEC 196H LEVEL
1968 FLOW CONDITIONS ( l<567 DOLLARS)
M4NUF&CTURING EMPLOYMENT
FLCW (WGY)
TOTAL CAPITAL COST
TOTAL 4NNUU OEM COST
TOTAL ANNUAL CCST
fAXI MUM
TCOC.
3U75.
19562544.
1066336.
3550778.
MINIMUM
25.
5.
16905.
637.
302 1.
AVERAGE
427.
1323.
84?696.
46812.
I5396C.
TOTAL
48721.
150874.
96181328.
5336599.
17551424.
S.O.
466.
4414.
2541875.
145805.
467686.
OEM
ANNUAL COST OF UAS1E IRbAT^ENT
REPLACEMENT INTtRFST
'336599.
48C9C66.
7405958.
TOT&L
I 7551616.
POST RANGE
> 5COOOO.
1COOOO. TO
f500CC. TC
10000. TC
0. TC
500000.
LCOOOO.
50000.
1000C.
COST RANGE
> 5CCOCOC.
IOOPOOO. TO 5000000.
500000. TC 1000000.
ICCOOO. TO 500000.
0. TO 100000.
M AX
MIN
AVF
TOT
SO
*1*
*2*
MAXIMUM
DISTRIBUTION OF OPERATICh AM) MAINTENANCE CCST
AVERAGE
542316. 813309.
47E512. 118133. 215097.
948C8. 72298. 33553.
4652S. 10110. 19022.
S877. 687. 4043.
DISTRIBUTION CF INVESTMENT REQUlPEMtNTS
MAXIMUM
24453168.
3P51182.
99C903.
477357.
97389.
MIN I M UM
8272395.
1013167.
516099.
100748.
21132.
AVERAGE
15718912.
2626145.
708379.
252637.
41287.
CISTRIRUTICN OF TOTAL CAPITAL CCST FCR TRESTMENT ($ loco
*3*
*<5*
28.
0.
28.
28.
0.
118.
1 .
18 .
912.
24.
514.
0.
102.
3676.
126.
6129.
0.
316.
2C540.
974.
34.
6.
11.
21?.
fi.
2578
0
388
27151
573
*7*
31 .
0.
31.
31 .
0.
*8*
3786.
7.
265.
27344 .
583.
TOTAL
2439927.
1935871.
167106.
494567.
299150.
TOTAL
62875648.
34139888.
8500546.
1338S785.
1321191.
S.D.
262196.
103880.
15917.
5246.
2645.
S.D.
7422627.
1079520.
131269.
113046.
23804.
NUMBER
3.
9.
2.
26.
74.
NUMBER
4.
13.
12.
53.
32.
5.
0.
3.
23 .
1 .
*LO*
0.
0.
c.
0.
0.
*ll*
7069.
0.
5421.
16264.
1799.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*l*
3.
0.
3.
0.
DISTRIBUTION 3f ANNUAL OEM TREATMENT CCSTS ($ 1000)
*6* *7* *8*
2 .
0.
1 .
30 .
0.
29.
0.
* .
173.
6.
157.
0.
11.
737.
27.
9.
1.
2.
41.
3.
367
0
34
2348
67
1.
0 .
1.
1.
0.
L C9.
0 ,
7 .
731.
17.
I.
0.
0.
3.
0.
*IC*
0.
0.
0.
0.
0.
*11*
549.
0.
423.
1269.
137.
*12*
0.
0.
0.
0.
0.
SO OR S.O. RFPRESFN'TS STANDARD DEVIATION. ThE DAT4 DISTRIBUTION USEC IS HIGHLY SKEWED.
-------
MAINE
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
„,__,., , , 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 11K
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
j_j COST RANGE
C/s > 5000000.
00 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
,MAX
'MIN
AVE
TOT
SD
*1*
28.
0.
28.
28.
0.
*2*
118.
1.
18.
897.
24.
MAXIMUM
3000.
31675.
19562544.
1066336.
3550778.
O6M
5279695.
MINIMUM
25.
4.
16506.
687.
2865.
ANNUAL COST OF WASTE
REPLACEMENT
4755093.
DISTRIBUTION OF OPERATION
MAXIMUM
1066336.
U78572.
94808.
1*1450.
9844.
MINIMUM
542816.
118133.
72298.
10110.
687.
AVERAGE
427.
1311.
834227.
46313.
152259.
TREATMENT
INTEREST
7322840.
AND MAINTENANCE COST
AVERAGE
813309.
215097.
83553.
18983.
4280.
TOTAL
48721.
149434.
95101872.
5279695.
17357488.
TOTAL
17357616.
TOTAL
2439927.
1935871.
167106.
398653.
338159.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
24453168.
3851182.
918083.
477357.
97389.
DISTRIBUTION
*3* *4*
514. 6129.
0. 0.
100. 315.
3585. 20449.
127. 975.
MINIMUM
8222395.
1013167.
536099.
100748.
20633.
AVERAGE
15718912.
2749756.
704090.
245426.
40717.
TOTAL
62875648.
32997072.
8449074.
13252978.
1302943.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
34. 2578.
6. 0.
11. 381.
212. 26665.
8. 574.
*7* *8*
31. 3786-
0. 7.
31. 262.
31. 26948.
0. 584.
*9* *10*
5. 0.
0. 0.
2. 0.
22. 0.
1. 0.
S.D.
466.
4417.
2543265.
145893.
467953.
S.D.
262196.
103880.
15917.
7839.
2807.
S.D.
7422627.
1026944.
125023.
107387.
23074.
NUMBER
3.
9.
2.
21.
79.
NUMBER
4.
12.
12.
54.
32.
7069.
0.
5421.
16264.
1799.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
3.
0.
3.
3.
0.
2.
0.
1.
30.
0.
29.
0.
5.
166.
6.
157.
0.
11.
731.
27.
9.
1.
2.
41.
3.
367
0
33
2313
67
1.
0.
1.
1.
0.
109.
0.
7.
722.
17.
1.
0.
0.
3.
0.
*10*
0.
0.
0.
0.
0.
549.
0.
423.
1269.
137.
*12*
0.
0.
0.
0.
0.
SD OR S.D.
,STAl«MiRD,j3p!SrlATION. THE DATA DISTRIgttTION USED IS HIGHLY SKEWED.
-------
MAINE
PLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 114
MANUFACTURING EMPLOYMENT
FLOW (MOT)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
3000.
23786.
15850481.
862070.
2875079.
MINIMUM
25.
3.
14256.
659.
2470.
AVERAGE
427.
1001.
706171.
37947.
127631.
TOTAL
U8721.
114067.
80503456.
4325980.
14549948.
S.D.
466.
3313.
2063425.
117233.
378671.
06M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
4325980.
4025172.
6198763.
TOTAL
14549915.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
*2*
MAXIMUM
862070.
425565.
93177.
41450.
9542.
MAXIMUM
19813088.
3177761.
842802.
477357.
97389.
MINIMUM
673024.
112356.
57144.
10110.
659.
AVERAGE
767547.
207680.
75056.
18540.
4073.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
6723746.
1013167,
502827.
100748.
17819.
AVERAGE
12780272.
2308298.
683870-
236380.
40174.
TOTAL
1535093.
1869117.
225168.
370794.
325829.
TOTAL
51121088.
27699584.
7522568.
13000887.
1285579.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT {$ 1000)
*3* *n* *5* *6* *7* *8* *9*
28.
0.
28.
28.
0.
118.
1.
17.
890.
24.
514.
0.
98.
3540. '
127.
4622
.0
241
15669
734
34.
6.
11.
212.
2200.
0.
333.
23338.
487.
31.
0.
31.
31.
0.
3149.
7.
226.
23247.
484.
5.
0.
2,
21.
1.
*10*
0.
0.
0.
0.
0.
S.D.
133682.
114815.
18017.
7913.
2513.
S.D.
5984414.
791601.
121554.
100303.
22526.
NUMBER
2.
9.
3.
20.
80.
NUMBER
4.
12.
11.
55.
32.
*11*
5879.
0.
4509.
13527.
1496.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
3.
0.
3.
3.
0.
*2*
2.
0.
1.
29.
0.
*3*
29.
0.
5.
163.
6.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
121.
0.
9.
576.
21.
9.
1.
2.
41.
3.
290.
0.
27.
185>8.
53.
1.
0.
1.
1.
0.
84.
0.
6.
591.
13.
1.
0.
0.
3.
0.
*10*
0.
0.
0.
0.
0.
*11*
458.
0.
353.
1060,
115.
*12*
. 0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL MJPPEP CF MANUFACTURING PLANTS...
MARYLAND
FLOW AT OBSERVEC 1968 LEVEL
1968 FLOW CONDITICNS ( 1967 CELLARS)
229
MANUFACTURING
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNIJAI C£,u C.PST
TTT4L 4NNU4L COST
CflST OiMGF.
TO
TO
TP
icooco.
50TOO
I 0<">CC.
0. TO
5COOOC.
1COOOO.
5000C.
1COOC.
(35 COST R4NG>~
O > 5000000.
IOOOOCC. T'l 5CCOOOO.
50COOO. TP 1000000.
100000. TT 500COO.
o. TO iroror.
MAX
M IN
TOT
sn
?77 84 .
0.
249?.
2990".
7321 .
*?*
12C9 .
1 .
26.
39(7.
10 '.
MAXIMUM
23000.
4450C.
3P536C96.
3101819.
79S59C2.
0£M
817S270.
DISTR
MAXIMUM
31013 19.
4R3134.
93671.
43286.
9926.
MINIMUM
18.
5.
11935.
975.
2928.
1NNU4L COST OF W4STE
REPLACEMENT
5147755.
AVERAGE
636.
502.
44953 6.
35713.
92809.
TREATMENT
INTEREST
7927540.
TOTAL
145728,
1 14891.
102955120.
81 7827C.
21253328.
TOT AL
21253552.
IBUTION OF OPERAT1CN AND MAINTENANCE COST
MINI MUM
3 10 1819.
124186.
5506°.
10412 .
975 .
AVERAGE
3101819.
247309 .
71009.
19524.
4630 .
TOTAL
3L018L9.
2473092.
781099.
1132396.
689908.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
1" 4 X I M. U M
4RI 701 12.
3378310.
f>£775.
462140.
980C4.
flSTR I"UT [ON
* ">* * 4*
4450. 42B2.
0. 0.
1(3. "0.
193°6. IC690.
431. 389.
MINIMUM
600C886.
1087422.
506890.
IT2165.
14919 .
OF TOTAL CAPITAL CCST
*5* *6*
56. 1866.
6. 0.
19. 135.
509. 15401.
1?. 218.
WER4GE
21617104.
1760149.
664770 .
202305.
61591.
FOR TREATMENT ($ 1000)
*7* *8*
36. 1697.
0 . 6.
31. 97.
94. 14623.
4 . I 97 .
TOTAL
64851312 .
26402240.
8642009.
23871936.
4927249.
*9* *10*
13. C.
0. 0.
3 . 0.
130. 0.
2 . 0.
S.D.
1994.
3 25.
26*8660.
21 290.
544065.
s.o.
0.
129180.
L2844.
8745.
2463.
S.O.
231 14304.
611217.
U7742.
79795.
22185.
NUMBER
1.
10,
11.
58.
149.
NUMBER
3.
15.
13.
US.
80.
*H*
0.
0.
0.
0.
0.
*12*
5939.
0.
2746.
8237.
2770.
AVF
THT
so
1.
] Sf .
1970.
r .
1 P?
OISTRI3UTICN OF *NN') »L CSM TPEiTMtNT COSTS ($ 1000)
*
-------
MARYLAND
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 229
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
28000.
44500.
38536096.
3101819.
7995902.
•
OSM
7587072.
MINIMUM
18.
5.
11935.
975.
2928.
ANNUAL COST OF WASTE
REPLACEMENT
4829986.
DISTRIBUTION OF OPERATION
MAXIMUM
3101819.
483134.
88863.
48571.
9926,
MINIMUM
3101819.
105309.
55068.
10188.
975.
AVERAGE
636.
468.
421833.
33131.
86703.
TREATMENT
INTEREST
7438176.
AND MAINTENANCE COST
AVERAGE
3101819.
201655.
69278.
20085.
4608.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
48170112.
3378310.
975362.
462140.
97774.
MINIMUM
6000886.
1039183.
506890.
102165.
14919.
AVERAGE
20420464.
1629000.
692381.
196468.
60984.
TOTAL
145728.
107243.
96599744.
7587072.
19855008.
TOTAL
19855232.
TOTAL
3101819.
2016547.
623506.
1144866.
700382.
TOTAL
61261424.
21177008.
10385722.
22986752.
4939669.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *i}* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
27284.
0.
2419.
29023.
7834.
1209.
1.
24.
3646.
101.
4450.
0.
151.
17960.
421.
4282.
0.
74.
9888.
386.
56.
6.
19.
509.
12.
1886.
0.
133.
15134.
218.
36.
0.
31.
94.
4.
1697.
6.
97.
14493.
197.
13.
0.
3.
126.
2.
*10*
0.
0.
0.
0.
0.
S.D.
1994.
3105.
2593045.
209214.
537937.
S.D.
0.
118446.
11130.
10008.
2435.
S.D.
24038064.
638517.
143926.
77387.
21279.
NUMBER
1.
10.
9.
57.
152.
NUMBER
3.
13.
15.
117.
81.
*11*
0.
0.
0.
0.
0.
*12*
4130.
0.
1909.
5728.
1927.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O£M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
654.
0.
74.
890.
184.
30.
0.
1.
150.
2.
1970.
0.
30.
3548.
181.
367.
0.
7.
878.
33.
29.
1.
7.
187.
7.
330
0
10
1162
33
2.
0.
2.
5.
0.
81.
0.
3.
522.
9.
3.
0.
1.
27.
1.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
156.
0.
73.
219.
72.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
MARYLAND
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
_-_-,. 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 229
MANUFACTURING EMPLOYMENT
FLOW
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
28000.
44500.
38536096.
3101819.
7995902.
MINIMUM
18.
4.
11935.
975.
2928.
AVERAGE
636.
135.
l»00070.
31184.
81992.
TOTAL
145728.
99674.
91615936.
7141240.
18776176.
S.D.
1994.
3052.
2576D13.
208073.
534811.
O6M
7141240.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
4580796.
7054423.
TOTAL
18776448.
DISTRIBUTION Of OPERATION AND MAINTENANCE COST
en
CO
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
3101819.
406578.
94462.
48506.
9909.
MAXIMUM
48170112.
3378310.
955725.
462140.
97774.
MINIMUM
3101819.
104908.
61595.
10478.
975.
AVERAGE
3101819.
189595.
73977.
21122.
4584.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5204145. 19528352.
1117944. 1708198.
506890. 695762.
100264. 185884.
14919. 58140.
TOTAL
3101819.
1706358.
517841.
1077234.
738039.
TOTAL
58585056.
17081984.
12523714.
21562544.
4767478.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
27284.
0.
2387.
28650.
7842.
1209.
1.
23.
3518.
101.
4450.
0.
142.
16913.
420,
*»282
0
- 69
9225
• 381
56.
6.
19.
503.
11.
1684.
0.
126.
14375.
200.
35.
0.
30.
91.
4.
1488.
6.
93.
13921.
183.
13.
0.
2.
116.
2.
*10*
0.
0.
0.
0.
0.
S.D.
0.
98226.
11320.
10633.
2468.
NUMBER
1.
9.
7.
51.
161.
S.D. NUMBER
24804496. 3.
677441. 10.
163149. 18.
74737. 116.
20868. 82.
*11*
0.
0.
0.
0.
0.
*12*
3105.
0.
1435.
4306.
1448.
MAX
MIN
AVE
TOT
SD
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS f$ 1000)
*5* *6* *7* *8* *9*
654.
0.
72.
864.
185.
30.
0.
1.
145.
2.
1970.
0.
29.
3396.
181,
367.
0.
6.
819.
32.
29.
1.
7.
181.
7.
279
0
9
1046
28
2.
0.
1.
4.
0.
81.
0.
3.
496.
9.
3.
0.
0.
24.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
118.
0.
55.
166.
55.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
THTSL NUMHFR OF MUNUF&CTUP ING PLANTS...
1968
514
MUSS »CHLSfTTS
FlOW AT OBSERVED 196H LEVEL
FLOW CONDITIONS ( 1967 DOLLARS)
MANUFACTUPING EMPLOYMENT
FLOW (MOV)
TOTH C4PIT4L COST
TPTAL AN'NUAl C£M COST
TOTAL ANNUAl COST
M&XI MUM
10000.
IS 100.
129S56QC.
2489P74.
MINIMUM
13.
0.
3362.
273.
700.
4VER4GE
582.
317.
278940.
18267.
53689.
TOTAL
299294.
162792.
143375296.
9389423.
275S6C32.
S.D.
996.
1111.
6S7026.
48277.
136062.
06M
9389423.
ANNUAL COST Of MAS1E
REPI IVCEMENT
TREATMENT
INTEREST
I 1039892.
TOTAL
27598064:
COST RANGE
> 500000.
100000. TO
50000. TO
lOOno. TO
0. TO
DISTRIBUTION OF OPERATICN AND MAINTENANCE CCST
^00000.
1CCOOO.
50000.
10000.
05 CCST RANGE
O? > 500100C.
1000000. TO 5000000.
^OOCCO. TO ICOOOOO.
100COO. TO 500000.
0. TO 100000.
*1*
836834.
93826.
45521.
99 15.
I»AX I HUM
16244500.
43573C1.
989594.
473S38.
97719.
MINIMUM
838834.
106556.
50490.
IC076.
273.
(WER4GE
838834.
168398.
70141.
18878.
4423.
OISTRIBUTION CF INVESTMENT RFCUIRfMtNTS
WIN HUM
16244500.
1013167.
518569.
IT1302 .
4202.
AVERAGE
16244500.
1798166.
702861.
209916.
56602.
TOTM.
838834.
2357577.
1893815.
2888270.
1411004.
TOTAL
16244500.
70128480.
28114448.
54998C96.
9735486.
DISTRIBUTICN QF TOTftL CAPITAL CCST FCR TREATMENT It 1000)
*5* *6* *7* *8* *9*
s.o.
0.
64646.
14141.
8659.
2605.
S.D.
0.
839419.
143523.
96756.
24070.
NUMBER
I.
14.
27.
153.
319.
NUMBER
1.
39.
40.
262.
172.
MAX
MIN
4VE
TCT
SO
94.
0.
18.
414.
25.
779.
0 .
12.
4071 .
21 .
10C7.
0 .
8?.
26692.
104.
3531.
0.
46.
17983.
197.
62.
4.
13.
567.
1 I .
18«1.
.0.
193.
4E6C4.
259.
29.
0.
29.
29.
0.
2642.
4.
126.
39774.
227.
15
0
2
309
2
*IC*
0.
0.
0.
0.
c.
*H*
4932.
0.
4932.
4932.
0.
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SO
*2*
*3*
DISTRIBUTION OF ANNUAL 0£* TREATMENT COSTS (t 1000*
*4* *5* *(* *7# *8* *9*
23.
0.
3.
69.
5 .
4.
0 .
L .
220.
0 .
174.
0.
7 .
2149.
14.
113.
0.
3 .
1256.
".
3?.
0.
4.
170.
7.
2C6
0
15
3808
3C
1.
0.
I.
1.
0.
78.
0.
4.
1190 .
7.
6.
0.
0.
68.
1 .
*10*
C.
0.
0.
0.
0.
*11*
459.
0.
459.
459.
0.
*12*
0.
0.
0.
0.
0.
SO OP S.D. REPRESENTS STANDAPC DEVIATION. THE DATA DISTRIEUTItN USED IS HIGHLY SKEWED.
-------
MASSACHUSETTS
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 514
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
10000.
18100.
12995600.
838834.
2489274.
OSM
8994343.
MINIMUM
13.
0.
3362.
273.
700.
ANNUAL COST OF WASTE
REPLACEMENT
6953957.
DISTRIBUTION OF OPERATION
MAXIMUM
838834.
297551.
93826.
45521.
9939.
MINIMUM
838834.
106556.
50490.
10009.
273.
AVERAGE
582.
305.
270582.
17499.
51859.
TREATMENT
INTEREST
10709090.
AND MAINTENANCE COST
AVERAGE
838834.
171915.
71137.
18401.
4443.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
16244500.
4357301.
989594.
473938.
99261.
MINIMUM
16244500.
1013167.
500541.
100476.
4202.
AVERAGE
16244500.
1816616.
695940.
204365.
57734.
TOTAL
299294.
156711.
139079168.
8994343.
26655440.
TOTAL
26657376.
TOTAL
838834.
2234896.
1920686.
2502561.
1497440.
TOTAL
16244500.
69031440.
25749776.
52317424.
10507622.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
94.
0.
18.
413.
25.
279.
0.
11 .
3811.
21.
1057.
0.
78.
25031.
101.
3531.
0.
45.
17417.
197.
62.
4.
13.
565.
12.
1891
0
189
47684
258
29.
0.
29.
29.
0.
2642.
4.
123.
38927.
227.
12.
0.
2.
271.
2.
*10*
0.
0.
0.
0.
0.
S.D.
996.
1110.
696757.
48135.
135934.
S.D.
0.
65877.
14798.
8162.
2548.
S.D.
0.
842633.
151901.
94046.
24330.
NUMBER
1.
13.
27.
136.
337.
NUMBER
1.
38.
37.
256.
182.
*11*
4932.
0.
4932.
4932.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
23.
0.
3.
68.
5.
4.
0.
1.
212.
0.
174.
0.
6.
1942.
13.
113.
0.
3.
1196.
8.
32.
0.
4.
169.
7.
206
0
15
3727
30
1.
0.
1.
1.
0.
78.
0.
4.
1165.
7.
4.
0.
0.
56.
1.
*10*
0.
0.
0.
0.
0.
*11*
459.
0.
459.
459.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
MASSACHUSETTS
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS < 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 514
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
uj COST RANGE
OS > 5000000.
CJ1 1000000. TO 5000000.
500000, TO 1000000.
100000. TO 500000,
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
94.
0.
18.
412.
25.
*2*
279.
0.
11.
3621.
21.
MAXIMUM
10000.
13592.
10575513.
680438.
2023527.
O6M
7750801.
MINIMUM
13.
0.
3362.
273.
700.
ANNUAL COST OF WASTE
REPLACEMENT
6194174.
DISTRIBUTION OF OPERATION
MAXIMUM
680438.
234001 .
93924.
48829.
9765.
MINIMUM
680438.
100503.
50490.
10076.
273.
AVERAGE
582.
245.
241018.
15079.
45686.
TREATMENT
INTEREST
9539023.
AND MAINTENANCE COST
AVERAGE
680438.
159790.
68877.
19460.
4379.
TOTAL
299294.
126165.
123883488.
7750801.
23482528.
TOTAL
23483984
TOTAL
680438.
1597899.
1446422.
2471461.
1554639.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
13219391.
3590458.
989122.
495920.
99676.
DISTRIBUTION
*3* *4*
1057. 2662.
0. 0.
74. 36.
23802. 14227.
99. 151.
MINIMUM
13219391.
1013167.
510201.
100122.
4202.
AVERAGE
13219391.
1676232.
718019.
203577.
58790.
TOTAL
13219391.
53639440.
26566688.
49672720.
11758083.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *&*
62. 1614.
4. 0.
13. 168.
563. 42442.
12. 220.
*7* *8*
29. 2198.
0. 4.
29. 109.
29. 34442.
0. 190.
*9* *10*
10. 0.
0. 0.
2. 0.
243. 0.
1. 0.
S.D.
996.
842.
577285.
39386.
111987.
S.D.
0.
50222.
12741.
9627.
2485.
S.C.
0.
720211.
152385.
95353.
24110.
NUMBER
1.
10.
21.
127.
355.
NUMBER
1.
32.
37.
244.
200.
*11*
4102.
0.
4102.
4102.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
23.
0.
3.
68.
5.
4.
0.
1.
205.
0.
174.
0.
6.
1802.
13.
87.
0.
3.
1005.
6.
32.
0.
4.
169.
7.
162
0
12
3060
23
1.
0.
1.
1.
0.
60.
0.
3.
1011.
5.
3.
0.
0.
47.
0.
*10*
0.
0.
0.
0.
0.
*11*
384.
0.
384.
384.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
T°TAI. NUMHFP UF MANUFACTURING PLANTS,
FLOW
196R FLOW
6ft 7
MICH IGAN;
4T OBSEPVEC 1968 LEVEL
CONOITICNS ( 1967 OCLLARSI
MAX
MANUFA.CUIPING FKPIOYI*FNT
Fl TW ("r,y )
TOTAL CAPITAL COST
TOT»L 4NINU11 OGf COST
TPTAL AMNJUAI COST
18000.
90C06.
3S5070C.
11944145.
MINIMUM
1 3.
1.
5C77.
419.
1064.
AVERAGE
776.
657.
533L67.
51157.
I 18377.
TOTAL
517765.
438280.
355622144.
3412152C.
79290800.
s.o.
1647.
4172.
3137907.
239180.
631985.
C£M
34121520.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
17781 104.
27382880.
TOTAL
79285504.
DISTRIBUTION OF OPER4TICN AND l» A TNT ENANCE CCST
TO 500000.
TT 100000.
*. TT 5COOO.
0. TO 10000.
COST RAN OF
looooor. TO
SOOOQO. Tn 10000TC.
TP 5CCOOO.
T. TP IfCOOO.
NAX If DM
4861 c. 5.
948CA.
49535.
M IN IM UM
505230.
100759.
5C760.
10027.
419.
AVERAGE
1812651.
189124.
69834.
22490.
5732 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
7«829680.
47^8263.
99E590.
4944BO.
992C6.
MINIMUM
5526128.
1005192.
502638.
10 0611 .
6346.
AVERAGE
3C743152.
1884318.
741437.
225269.
71179 .
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT (t 1000)
TOTAL
12688558.
8699700.
4399551.
6949508.
1387051.
TOTAL
184458S44.
103637520.
58573504.
88305472.
9609214.
S .0.
1545728.
87509.
13619.
11164.
2537.
S.D.
30224192.
867618.
151252.
98804.
20121.
NUMBER
7.
46.
63.
309.
242.
NUMBER
6.
55.
79.
39Z.
135.
MAX
MIN
A VF
TOT
SO
*]*
4C7?3.
0.
2239.
«7331 .
8260.
*?*
1774.
0 .
29.
1507^.
107 .
*3*
4 '3 55.
0 .
177 .
P7C51 .
3t6.
*4*
9073.
0.
93.
50092.
4PO.
*5*
432.
5.
32.
1450.
64.
*6*
2445.
0.
2 10.
52739.
262.
*7*
32.
0.
32.
64.
0.
*8*
7343.
10.
197.
50556 .
528.
*g*
37
0
4
1230
5
*10*
0.
0.
c.
0.
0.
Ml*
3828.
0.
3828.
3828.
0.
*12*
3303.
0.
1249.
6244.
1190.
DISTRIBUTION OF ANNUAL Ct,V 1RE*TNEHT CCSTS ($ 1000 »
*4# *5* *t* *7* *8* *S*
MAX
M IN
AVF
TOT
831 .
0.
64.
2511 .
38 .
I- •
1 .
719.
7 .
2511.
0.
32.
157M .
144.
468.
0.
9.
47-^5 .
31 .
1309.
I .
1 39.
1787.
192.
524
0
21
52C9
45
2.
0.
2.
3.
0.
538.
I.
9 ,
2203.
36.
25.
0.
1 .
430.
3.
*10*
0.
0.
0.
0.
c.
*ll*
442.
0.
442.
442.
0.
*12*
U2.
0.
55.
273.
51.
SO Pf> S.O. RFPPt-SENTS STftNDARD t E V I AT IC N. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
MICHIGAN
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS < 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 667
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
18000.
81138.
55021232.
3499223.
101(86918.
MINIMUM
13.
1.
5071.
419.
1063.
AVERAGE
776.
517.
422933.
39250.
92964.
TOTAL
517765.
344831.
282096128.
26179968.
62007152.
S.D.
1647.
3548.
2408178.
188205.
488526.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
26179968.
14104805.
21721376.
TOTAL
62006144.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO TOOOO.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
*1*
*2*
MAXIMUM
3499223.
486195.
99182.
49662.
9956.
MAXIMUM
68776528.
4788263.
994919.
498980.
99510.
MINIMUM
770695.
100759.
50891.
10093.
419.
AVERAGE
1846037.
185635.
70554.
21629.
5600.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5250086.
1005192.
505899.
100723.
6338.
AVERAGE
22759696.
1862245.
756769.
207541.
71843.
TOTAL
9230189.
6311584.
3316016.
5493672.
1831307.
TOTAL
136558176.
81938816.
45406112.
74507168.
14224907.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *n* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
33690.
0.
1435.
55951 .
5816.
1642.
0.
21.
11249.
90.
4216.
0.
136.
66763.
297.
8192.
0.
71.
38532.
408.
412.
5.
31.
1407.
61.
2445
0
196
49087
285
32.
0.
32.
64.
0.
6869.
10.
188.
48365.
498.
32.
0.
3.
892.
3.
*10*
0.
0.
0.
0.
0.
S.D.
1201651.
83271.
14213.
11103.
2311.
S.D.
23984688.
824100.
139100.
94777.
19536.
NUMBER
5.
34.
47.
254.
327.
NUMBER
6.
44.
60.
359.
198.
*11*
3828.
0.
3828.
3828.
0.
3147.
0.
1193.
5963.
1132.
MAX
MIN
AVE
TOT
SD
*1*
572.
0.
48.
1891.
123.
*2*
*3*
DISTRIBUTION OF ANNUAL OgM TREATMENT COSTS ($ 1000)
+ 14* *5* *6* *7* *8* *9*
27.
0.
1.
588.
2.
1667.
0.
22.
10707.
100.
371.
0.
7.
3512.
24.
1202.
1.
36.
1654.
177.
524
0
19
4805
45
2.
0.
2.
3,
0.
484.
1.
8.
2051.
32.
13.
0.
1.
269.
2.
+ 10*
0.
0.
0.
0,
0.
+ 11*
442.
0.
442.
442.
0.
*12*
135.
0.
52.
261.
48.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
MICHIGAN
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 667
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
., COST RANGE
g} > 5000000.
CO 1000000. TO 5000000,
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN-
AVE
TOT
SD
*1*
7733.
0.
502.
19576.
1702.
*2*
843.
0.
15.
7968.
55.
MAXIMUM
18000.
332U7.
1793590U.
1923031*.
3884960.
OSM
19547280.
MINIMUM
13.
0.
4104.
375.
896.
ANNUAL COST OF WASTE
REPLACEMENT
10195456.
DISTRIBUTION OF OPERATION
MAXIMUM
1923034.
407209.
99984.
49670.
9835.
MINIMUM
770695.
100759.
50261.
10042.
375.
AVERAGE
776.
367.
305711.
29306.
68130.
TREATMENT
INTEREST
15700997.
AND MAINTENANCE COST
AVERAGE
1238978.
172048.
69392.
21505.
5120.
TOTAL
517765.
244896.
203909152.
19547280.
45442624.
TOTAL
45443728
TOTAL
6194894.
4473248.
2428716.
4429966.
2022459.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
22419872.
3891697.
990200.
492866.
99306.
DISTRIBUTION
*3* *4*
2928. 3400.
0. 0.
105. 51.
51650. 27324.
211. 228.
MINIMUM
8138096.
1021597.
505899.
100723.
5129.
AVERAGE
13933011.
1862936.
737761.
199160.
66220.
TOTAL
69665056.
68928640.
35412544.
63930432.
16952400.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
276. 2445.
5. 0.
24. 183.
1083. 45956.
40. 280.
*7* *8*
32. 3870,
0. 10.
31. 160.
63. 41231.
0. 347.
*9* *10*
21. 0.
0. 0.
2. 0.
674. 0.
2. 0.
S.D.
1647.
1875.
1081895.
118572.
253752.
S.D.
513372.
71823.
14308.
11102.
2285.
NUMBER
5.
26.
35.
206.
395.
S.D. NUMBER
6142389. 5.
772900. 37.
147745. 48.
96281. 321.
19710. 256.
*11* *12*
3828. 2366.
0. 0.
3828. 911.
3828. 4553.
0. 837.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
425.
0.
32.
1265.
83.
21.
0.
1.
492.
1.
1202.
0.
15.
7394.
68.
225.
0.
5.
2605.
16.
577.
1.
19.
860.
84.
524
0
18
4487
45
2.
0.
2.
3.
0.
202.
1.
6.
1616.
16.
9.
0.
1.
183.
1.
*10*
0.
0.
0.
0.
0.
*11*
442.
0.
442.
442.
0.
*12*
102.
0.
40.
201.
36.
SD OR S.D. REBKESENTSiBTANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMPFR OF MANUFACTURING PI ANTS...
MINNESOTA
FLOW AT OBSERVED IS 68 LFVEL
1968 FLOW CONDITIONS ( 1967 CCLLARS)
250
MANUFACTURING EMPIOYMFNT
FLOW
TOTAL CAPITAL COST
TOTAL ANNUAL CE.M COST
TO TIL &NNLUL COST
MAXIMUM
1=)00.
2672171.
188 190.
527CC5.
MINIMUM
I 5.
7.
24062.
4560.
AVERAGE
326.
248.
254718.
17391.
49741.
TOTAL
81498.
62006.
63679408.
4347819.
12435231.
S.O.
484.
571.
385646.
28817.
768S3.
0 £M
4347819.
&NNUHL COST OF MSTE TREATMENT
REPLACEMENT INTEREST
3183970.
4903312.
TOTAL
124351CI.
COST n INGE
> 500000.
IOOOOP. TO
50000. TO
10000. TC
0. TO
DISTRIBUTION OF OPERATICN AKO MAINTENANCE COST
5CCOOC.
1COO )0.
50COO.
10COO.
05 COST RANGE
5000000.
irococo. TO 50oococ.
50CCOO. TO 1000000.
100000. TO 500000,
0. TO 100000.
0.
18R190.
94914.
49174.
0.
33402 13.
MINIMUM
0.
108663.
5C993.
10269.
1426.
AVERAGE
0.
148200.
67296.
19793.
4324.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
99930.
MINIMUM
0.
1030524.
518190.
101228.
30077 .
HVER1GE
0.
1681267.
717623.
217272.
60598.
TOTAL
0.
1185600.
740254.
182CS40.
601085.
TOTHL
0.
33625344.
12917220.
28028048.
5029626.
S.D.
0.
32806.
14281.
9233.
2550.
S.D.
0.
704014.
129281.
99854.
20185.
NUMBER
0.
8.
It.
92.
139.
NUMBER
0.
20.
18.
129.
83.
DISTRIBUTION Of TOTAL CAPITAL CCST FCR TREATMENT ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
M IN
AVE
TOT
SD
6.9.
0.
35 .
34°.
28.
283 .
1 .
24.
3147 .
3^.
901 .
0.
75.
10971 .
CO.
634.
0.
41.
4T62.
S5.
P6.
9.
?8.
622 .
22.
t 144
0
2 11
20440
221
0.
0.
0.
3.
0.
913,
13.
1 15.
20206.
168 .
42.
0.
5.
283.
*10*
c.
0.
0.
0.
c.
*11*
0.
0.
0 .
0.
0.
*12*
969.
0.
580.
2900.
339.
M 4X
MIN
AVE
TOT
SO
16.
0.
7.
71 .
*2*
5.
0 ,
1 .
130 ,
I ,
*3*
01STRIPUTICN OF 4NN'J 6L C&M IPEflTMfcNT COSTS (t 1000)
*4* *5# * 6* * 7* * 8* *9*
81.
0.
f- .
?n.
10.
34.
0.
4.
406.
6 .
PO.
2 .
15.
330.
22.
132.
f .
17.
1617.
26.
0.
0.
0.
0 .
0.
33 .
1 .
4.
662 .
5.
17.
0.
1 .
81 .
3.
*10*
0.
0.
c.
0.
0.
*11*
0.
0 .
0.
0 .
0.
*12*
38.
0.
23.
115.
13.
SC OR S.O. REPRESENTS STANDAPi) CfVIATI'lN. THE DATA DISTRIBL11CK LSEO IS HIGHLY SKEWED.
-------
MINNESOTA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
_____ 1968 FLOW CONDITIONS ( 1967 DOLLARS?
TOTAL NUMBER OF MANUFACTURING PLANTS... 250 '
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
3900.
4452.
2277264,
188190.
477402.
MINIMUM
15.
U.
16158.
965.
3017.
AVERAGE
326.
210.
227516.
15006.
43901.
TOTAL
81498.
52547.
56878976.
3751551.
10975298.
S.D.
184.
524.
357354.
26253.
70858.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
3751551.
2843948.
4379679.
TOTAL
10975178.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0.. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO. 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD-
*1*
*2*
MAXIMUM
0.
188190.
84561.
44867.
9936.
MAXIMUM
0.
2846580.
930490.
497849.
99740.
MINIMUM
0.
102930.
53696.
10018.
965.
AVERAGE
0.
143267.
66235.
19634.
4373.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1023718.
513274.
100437.
20197.
AVERAGE
0.
1614480.
694193.
207902.
61831.
TOTAL
0.
1002869.
596117.
1452910.
699707.
TOTAL
0.
29060640.
11801278.
24116688.
6121249.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *a* *5* *6* *7* *8* *9*
89.
0.
34.
338.
28.
230.
1.
19.
2569.
33.
901.
0.
66.
9682.
87.
470
0
35
4046
84
75.
9.
25.
555.
19.
1037.
0.
192.
18594.
205.
0.
0.
0.
0.
0.
839.
12.
102.
17973.
152.
34.
0.
4.
221.
7.
*10*
0.
0.
0.
0.
0.
S.D.
0.
31813.
9809.
8537.
2515.
S.D.
0.
689216.
132050.
93283.
22042.
•NUMBER
•o.
7.
9.
74.
160.
NUMBER
0.
18.
17.
116.
99.
*11*
0.
0.
0.
0.
0.
*12*
969.
0.
580.
2900.
339.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
16.
0.
7.
67.
5.
4.
0.
1.
115.
1.
81.
0.
5.
774.
10.
28.
0.
3.
342.
5.
62.
2.
12.
270.
17.
131.
0.
15.
1421.
24.
0.
0.
0.
0.
0.
29.
1.
3.
589.
5.
13.
0.
1.
58.
2.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
38.
0.
23.
115.
13.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIB0TION USED IS HIGHLY SKEWED.
-------
MINNESOTA
FtOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS..." 250
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
3900.
4452.
2277264.
188190.
477402.
MINIMUM
15.
3.
13958.
829.
2601.
AVERAGE
326.
171.
197184.
12512.
37555.
TOTAL
81498.
42790.
49295968.
3128111.
9388811.
S.D.
484.
487.
332508.
23771.
65465.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
3128111.
2464798,
3795787.
TOTAL
9388696!
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0, TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
*1*
*2*
MAXIMUM
0.
188190.
79552.
49605.
9872.
MAXIMUM
0.
2846580.
998817.
485368.
98676.
MINIMUM
0.
105138.
53696.
10248.
829.
AVERAGE
0.
148121.
64422.
19177.
4077.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
1043560. 1840689.
510331. 725456.
101719. 198294.
17447. 57636.
TOTAL
0.
740606.
515379.
1150627.
721561.
TOTAL
0.
20247584.
13783655.
21019216.
6570535.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* */4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
89.
0.
32.
317.
29.
230.
1.
15.
2047.
28.
901.
0.
56.
8213.
81.
470.
0.
30.
3433.
78.
65.
9.
21.
470.
16.
1037
0
169
16425
193
0.
0.
0.
0.
0.
839.
10.
87.
15312.
138.
28.
0.
3.
180.
5.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
S.D.
0.
36404.
8119.
9298.
2470,
S.D.
0.
714742.
137801.
91724.
22138.
*12*
969.
0.
580.
2900.
339.
NUMBER
0.
5.
8.
60.
177.
NUMBER
0.
11.
19.
106.
114.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*(,* *5* *6* *7* *8* *9*
16.
0.
6.
61.
5.
3.
0.
1.
101.
0.
81.
0.
4.
600.
8.
28.
0.
2.
287.
5.
48.
2.
9.
199.
13.
131.
0.
13.
1215.
23.
0.
0.
0.
0.
0.
29.
1.
3.
505.
4.
10.
0.
1.
44.
2.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
38.
0.
23.
115.
13.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTM. NUMBER OF MANUFACTURING PLANTS...
1968
133
MISSISSIPPI
FLOW AT OBSERVED 1968 LEVEL
FLOW CONDITIONS ( 1967 DOLLARS)
MANUFACTURING EMPLOYMENT
FlOW (fGV)
TOT4L CIVPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAl COST
MUM
2000.
8626"?.
3P326288.
2038290.
6905727.
MINIMUM
15.
4.
23194.
4292.
AVERAGE
342.
1161.
582837.
35153.
109173.
TOTAL
45538.
154348.
77517296.
4675296.
14520C57.
S.D.
331.
7588.
3330331.
179812.
601621.
ANNUAL COST OF fcASTE
0£M REPLACEMENT
4675296. 3875(64.
TREATMENT
INTEREST
596882 £.
14519988.
COST RANGt
> 500COO.
100000. TO
r>rooc. TO
10000. TO
0. Tt
DISTRIBUTION OF OPERATICN AND MAINTENANCE CCST
500000.
1COOOC.
5000C.
10000.
mj COST RANGF
tO > 5CCCCOC.
1000000. TO 5000030.
50COCC. TO IOCOOOO.
looooo. TO 5rooor.
0. TP 100000.
MAX
WIN
IWE
TOT
sr>
130.
0.
71.
353 .
58.
106 .
i .
18.
1?? .
23.
20382SO.
239298.
874CO.
46366.
9988.
47907856.
4412563.
979134.
494B52.
96924.
MINIMUM
2038290.
128485.
58530.
IC004.
959.
AVERAGE
2038290.
205022.
71245.
19969.
5026.
DISTRIBUTION OF INVESTMENT RETIREMENTS
MINIMUM
47907856.
1021142.
558931.
1T1052.
28992.
AVERAGE
47907856.
2059830.
799386.
229415.
60579.
DISTRIBUTICN OF VOT M C4PIT1L CCST FCR TREATMENT (t 1000)
*4* *5* #t* *7# *8*
TOTAL
2038290.
1025UO.
356227.
858674.
397C29.
TOTAL
47907856.
20598304.
7194478.
19500288.
1696220.
S.O.
0.
64456.
14339.
10764.
2804.
S.O.
0.
1004722.
166909.
103890.
22389.
P40.
0.
1 19.
8446.
141 .
If 150.
0.
19728.
109.
7.
29.
7?4.
23 .
4135.
0.
273.
15565.
588 .
66.
0.
54.
1C8.
16.
6640.
6.
213.
18913.
7 18.
20.
1.
4.
149.
3.
*10*
0.
c.
c.
0.
c.
NUMBER
1.
5.
5.
43.
79.
NUMBER
1.
10.
9.
85.
28.
12402.
0.
124C2.
12402.
0.
*12*
0.
0.
0.
0.
0.
MAX
M IN
AVE
TOT
SO
*]*
2? .
r.
<^.
46.
9.
2.
n.
L .
*3*
146.
0.
11 .
75<5.
22.
CISTRIBUTICN OF ANNUAL 0£M TREATMENT COSTS ($ 10CO)
*4* *s* *6* *7* *8* *9*
345.
0.
7 .
*57.
36.
153.
1.
15.
377.
30.
514.
0.
22.
1282.
13.
8.
0.
5.
10.
4.
259,
0 .
f>.
558.
28.
S.
0 .
I.
26.
I .
#10*
0.
0.
0.
c.
0.
*11*
921.
0.
921.
921.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.C. BfPPESENTS STM^DIVRC OfVIHTITN.
THE DATA DISTRIBUTION USEC IS HIGHLY SKEWED.
-------
MISSISSIPPI
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 133
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
._, COST RANGE
«3 > 5000000.
CO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
120.
0.
60.
299.
50.
*2*
81.
1.
13.
85U.
17.
MAXIMUM
2000.
45250.
23487680.
1246363.
U229297.
0£M
30320M2.
MINIMUM
15.
4.
23169.
903.
3846.
ANNUAL COST OF WASTE
REPLACEMENT
2664833.
AVERAGE
342.
640.
400727.
22797.
73690.
TREATMENT
INTEREST
4103841.
TOTAL
45538.
85118.
53296672.
3032042.
,9800787.
TOTAL
9800716
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
1246363.
146454.
89463.
47884.
9618.
MINIMUM
1246363.
102584.
57474.
10546.
903.
AVERAGE
1246363.
122878.
77245.
20541.
4910.
TOTAL
1246363.
368633.
386226.
554611.
476242.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
29359600.
2854940.
853685.
457109.
99574.
DISTRIBUTION
*3* *4*
628. 8021.
0. 0.
91. 114.
6479. 10799.
104. 822.
MINIMUM
29359600.
1021142.
533531.
101369.
28961.
OF TOTAL CAPITAL COST
*5* *6*
60. 2893.
7. 0.
25. 207.
625. 11820.
15. 410.
AVERAGE
29359600.
1606561.
671533. ,
209828.
62526.
FOR TREATMENT ($ 1000)
*7* *8*
47. 4385.
0. 6.
45. 158.
89. 14033.
3. 474.
TOTAL
29359600.
12852489.
5372262.
16786256.
2250920.
*9* *10*
10. 0.
0. 0.
3. 0.
112. 0.
2. 0.
S.D.
331.
3960.
2042162.
109372.
368330.
S.D.
0.
22118.
13823.
11630.
2599.
S.D.
0.
628573.
122929.
9669.0.
24552.
NUMBER
1.
3.
5.
27.
97.
NUMBER
1.
8.
8.
80.
36.
8188.
0.
8188.
8188.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
22.
0.
8.
42.
8.
2.
0.
1.
34.
0.
96.
0.
7.
506.
14.
193.
0.
4.
392.
20.
46.
1.
10.
243.
11.
302.
0.
14.
811.
43.
3.
0.
3.
5.
0.
137.
0.
4.
366.
15.
2.
0.
0.
17.
0.
*10*
0.
0.
0.
0.
0.
*11*
614.
0.
614.
614.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
MISSISSIPPI
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 133
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
2000.
33981.
18974928.
1005249.
31*15063.
MINIMUM
15.
H.
1751*8.
606.
2834.
AVERAGE
342.
472.
325390.
17771.
59096.
TOTAL
45538.
62789.
43276880.
2363604.
7859826.
S.D.
331.
2972.
1648596.
88002.
297110.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
2363604.
2163843.
3332318.
TOTAL
7859765.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*2*
MAXIMUM
1005249.
115364.
99137.
39864.
9627.
MAXIMUM
23718656.
2361155.
975724.
491104.
98629.
MINIMUM
1005249.
115364.
57903.
10534.
606.
AVERAGE
1005249.
115364.
74776.
18331.
4479.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
23718656. 23718656.
1009070. 1666151.
549890. 670762.
101164. 211245.
21935. 62267.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT (* 1000)
*3* *4* *5* *6* *7* *8*
MAX
MIN
AVE
TOT
SD
84.
0.
34.
170.
31.
56.
1.
9.
599.
11.
550.
0.
71.
5051.
81.
6048.
0.
85.
8038.
620.
46.
7.
20.
505.
11.
2468.
0.
182.
10382.
348.
42.
0.
40.
80.
3.
3648
6
130
11552
393
TOTAL
1005249.
115364.
373879.
403287.
465856.
TOTAL
23718656.
6664607.
5366092.
15420856.
2926530.
6.
0.
2.
90.
2.
*10*
0.
0.
0.
Oi«
0.
*11*
6810.
0.
6810.
6810.
0.
S.D.
0.
0.
16046.
7964.
2492.
S.D.
0.
554448.
155760.
101474.
23973.
NUMBER
1.
1.
5.
22.
104.
NUMBER
1.
4.
8.
73.
47.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
17.
0.
5.
27.
6.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
2.
0.
0.
30.
0.
80.
0.
5.
359.
11.
149.
0.
3,
299.
15.
32.
1.
7.
167.
8.
239.
0.
12.
658.
34.
2.
0.
2.
4.
0.
104.
0.
3.
294.
11.
1.
0.
0.
13.
0.
*10*
0.
0.
0.
0.
0.
*11*
513.
0.
513.
513.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESBNTS STANDARD
THE DATA DISTRIBOTION USED IS HIGHLY SKEWED,
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
MISSOUR I
FLOW &T OBSERV£C 1968 LEVEL
196fl FLOW CONDITIONS ( 1967 OCLLARS)
293
SO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTiL fkNMUL OEM COST
TOTAL ANNUAL COST
MAX IMUM
38000.
H233.
6487405.
934C5C.
1757S5C.
C6M
6662654.
MINIMUM
5.
C.
1766.
248.
472.
ANNUAL COST OF hASTE
REPLACEMENT
396C616.
AVERAGE
591.
293.
270363.
22739.
57076.
TREATMENT
INTEREST
6099657.
DISTRIBUTION OF OPERSTIO AND MAINTENANCE CCST
COST RANGE
> 5CCOOC.
100000. TO 500000.
50000. TG 100000.
10000. TO 5COOC.
0. TO 10000.
MAXIMUM
934050.
352339.
91971.
47244.
S9C2.
MINIMUM
934050.
102423.
5C491 .
10283.
248.
AVERAGE
934050.
209476 .
66746.
21781 .
4988.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
CTST PANGF
> 5000000.
1000000. TO 5CCCOOC.
500000. TO 1000000.
10COOO. TO 5COOOO.
0. TO 1COOOO.
*1* #2*
X 2663. 423.
N 0. 0.
E 260. 21.
T 4424. 3845.
67?. 45 .
MAXIMUM
8 109256.
450C546.
9961C8.
494153.
9?7C1.
DISTRI8UTICN
*3* *4*
17S4. 1078.
o. n.
129. 38.
216C8. 7068.
200. 110.
MINIMUM
804
-------
MISSOURI
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
m™,*T «,, 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 293
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
wj COST RANGE
5000000.
O5 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
1925.
0.
184.
3126.
179.
*2*
361.
0.
17.
3193.
38.
MAXIMUM
38000.
9075.
5186667.
774778.
1433484.
OSM
5557069.
MINIMUM
5.
0.
1766.
248.
472.
ANNUAL COST OF WASTE
REPLACEMENT
3386297.
AVERAGE
591.
237.
231147.
18966.
48322.
TREATMENT
INTEREST
5214895.
TOTAL
173093.
69380.
67725952.
5557069.
14158437.
TOTAL
14158261
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
774778.
322873.
91086.
45449.
9709.
MINIMUM
774778.
147342.
52008.
10045.
248.
AVERAGE
774778.
203745.
68032.
21097.
4705.
TOTAL
774778,
1222472.
952444.
1708863.
898584.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
6183333.
3854687.
948276.
494153.
99908.
DISTRIBUTION
*3* *4*
1566. 874.
0. 0.
114. 31.
19097. 5775.
176. 87.
MINIMUM
6076776.
1124385.
502534.
101671.
2207.
OF TOTAL CAPITAL COST
*5* *6*
59. 1044.
3. 0.
17. 125.
922. 13896.
12. 162.
AVERAGE
6280054.
1986130.
663018.
201664.
63375.
FOR TREATMENT ($ 1000)
*7* *8*
33. 893.
0. 8.
31. 90.
123. 15229.
4. 128.
TOTAL
12560109.
21847440.
13923377.
29039616.
7288166.
*9* *10*
28. 0.
0. 0.
3. 0.
304. 0.
5. 0.
S.D.
2314.
707.
521999.
55170.
117517.
S.D. NUMBER
0. 1.
74683. 6.
12660. 14.
10459. 81.
2322. 191.
S.D.
287480.
959100.
139452.
92699.
23683.
NUMBER
2.
11.
21.
144.
115.
*11*
0.
0.
0.
0.
0.
*12*
3580.
0.
2020.
6061.
1589.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*U* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
179.
0.
20.
343.
44.
10.
0.
1.
151.
1.
475.
0.
14.
2385.
44.
89.
0.
3.
576.
8.
58.
0.
7.
390.
- 10.
114
0
8
890
15
2.
0.
2.
7.
0.
31.
1.
3.
500.
4.
9.
0.
1.
74.
2.
*10*
0.
0.
0,
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
141.
0.
80.
240.
62.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHJLY SKEWED.
-------
MISSOURI
PLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 293
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
38000.
6320.
36291*54.
564708.
10256U9.
MINIMUM
5.
0.
1766.
248.
472.
AVERAGE
591.
167.
183232.
1H157.
37428.
TOTAL
173093.
48825.
53687040.
4147965.
10966365.
S.D.
2314.
475.
377236.
38804.
83755.
O5M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
4147965.
2684351.
4133900.
TOTAL
10966216.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000,
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
564708.
202366.
94849.
46161.
9921.
MAXIMUM
0.
4536817.
967953.
494153.
99403.
MINIMUM
564708.
116142.
55691.
10256.
248.
AVERAGE
564708.
150637.
72940.
21685.
4349.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
1032301. 2234177.
504808. 680820.
100810. 196938.
2207. 58882.
TOTAL
564708.
602548.
510578.
1561350.
908852.
TOTAL
0.
22341776.
10212296.
26783616.
7772365.
MAX
MIN
AVE
TOT
SD
1133.
0.
114.
1933.
282.
276.
0.
13.
2434.
28.
1244.
0.
92.
15418.
130.
612
0
21
3910
56
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *t(* *5* *6* *7* *8* *9*
17.
0.
3.
234.
3.
59.
3.
15.
812.
11.
860.
0,
106.
11802.
131.
33.
0.
30.
120.
3.
779
5
73
12471
102
*10*
0.
0.
0.
0.
0.
S.D.
0.
39447.
13994.
9718.
2344.
S.D.
0.
1340957.
163472.
89306.
22292.
NUMBER
1.
4.
7.
72.
209.
NUMBER
0.
10.
15.
136.
132.
*11*
0.
0.
0.
0.
0.
*12*
2691.
0.
1519.
4556.
1195.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9»
133.
0.
15.
255.
33.
8.
0.
1.
131.
1.
343.
0.
10.
1672.
30.
64
0
2
411
5
58.
0.
6.
321.
9.
96.
0.
6.
704.
12.
2.
0.
2.
6.
0.
26.
0.
2.
414.
3.
5.
0.
1.
50.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
107.
0.
61.
182.
47.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL MlMpfR PF f AMU F ACTll P ING PLANTS...
1968
28
MONTANA
FLOW AT flBSERVEC 1968 LEVEL
FLOW COINOITICNS ( 1967 DCLLARS1
MANUFACTURING EMPLOYMENT
FLTW (Mr.y)
TOTAL CAPITAL COST
TPTAI ANNUAL D6M COST
TOTAL ANNUAL COST
MAXIMUM
2 TOO.
14344988.
974631.
?7S£444.
MINIMUM
25.
19.
4512C.
2219.
8212.
AVERAGE
354.
1425.
1523900.
100516.
294052.
TOTAL
9901 .
39904.
42669216.
2814455.
8233460.
S.D.
595.
3515.
2904016.
185451.
546595.
OEM
2814455.
4NNU1L COST OF WASTE TREATMENT
REPLACEMENT INTEREST
2133460.
3235526.
TOTAL
8233443.
OISTRIBUTION OF DPERATIGN AND MAINTENANCE CCST
COST RANGF
> 500000.
10CCOO. TO
5COOO. TO
10000. TO
0. TO
500000.
100000.
^0000.
10CQO.
«[j COST RANGE
00 > 5000000.
1000000. Tf 500000C.
5000CO. Tn ircoooc.
100000. TO 500000.
C. TO ICOOOO.
*1*
fiXIMUM
974631.
?S9312.
PS476.
43726.
7215.
MINIMUM
974631.
10 1267 .
51639.
I 1979.
2219.
AVERAGE
974631.
169045.
64888.
20756.
4804.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
17931?32.
3726753.
917923.
493401.
58998.
MINIMUM
9052195.
I 126567.
599444.
120432.
56399.
AVERAGE
13491712.
1997168.
807258.
198978.
57265.
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TREATMENT (1 1000>,
TOTAL
974631 .
1183318.
519103.
103781.
33629.
TOTAL
26983424.
21968848.
2421775.
1790801.
171796.
#3*
*4*
MAX
MIN
AVE
TOT
SO
313.
0.
1 52.
912.
108.
153.
7.
37.
622 .
39.
1035.
0.
2fO.
4504.
?6fl.
3919
0
320
6402
»61
*5*
28.
14.
18.
73.
7.
*6*
20 fiC.
0.
665.
53 19.
623.
*7*
0.
0.
0.
0.
0.
*8*
2911.
19,
388,
5425.
755 ,
*9*
*10*
S.D.
0.
61867.
16129.
13475.
2368.
S.O.
6278429.
867109.
180100.
126824.
1500.
NUMBER
1.
7.
8.
5.
7.
NUMBER
2.
11.
3.
9.
3.
*ll*
*12*
8.
3.
5.
18.
3.
6137.
0.
6137.
6137.
C.
5434.
0.
5434.
5434.
0.
2259.
0.
1304.
7824.
700.
MAX
MIN
AVE
TOT
sn
*i*
44.
0.
150.
14.
*2*
*3*
DISTRIBUTION OF ANNUAL C£M TRE6TMENT COSTS ($ 1000)
*4* #5* *6* *7* *8* *9*
' *
1 .
1.
23.
1 .
2^.3.
0 .
39.
700.
60 .
131.
0.
18.
352.
30.
13.
3.
6.
23.
5.
220.
0.
fc4.
513.
68.
0.
0.
0.
0.
0.
91 .
1.
12.
167 .
24.
2.
I .
1.
4.
I.
*10*
*ll*
*12*
1C.
0.
10.
10.
0.
533.
0.
533.
533.
0.
97.
0.
57.
340.
30.
flP S.C. RFPRFSENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
MONTANA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 28
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
2500.
7919.
7838382.
526845.
1522318.
MINIMUM
25.
10.
31150.
1429.
5385.
AVERAGE
354.
721.
962859.
63796.
186079.
TOTAL
9901.
20177.
26960064.
1786287.
5210222.
S.D.
595.
1509.
1581003.
10168M.
298U99.
ANNUAL COST OF WASTE
06M REPLACEMENT
1786287. 1348003.
TREATMENT
INTEREST
2075923.
TOTAL
5210213.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
(^I COST RANGE
.q > 5000000.
CD 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
*2*
MAXIMUM
526845.
169022.
76124.
48237.
5489.
MAXIMUM
9797977.
4591495.
974062.
468253.
94853.
MINIMUM
526845.
101267.
50485.
11979.
1429.
AVERAGE
526845.
122001.
63304.
31382.
3465.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
9797977. 9797977.
1098643. 2249721.
703924. 868783.
102035. 239720.
38938. 65774.
TOTAL
526845.
732005.
126608.
376580.
24255.
TOTAL
9797977.
15748047.
6081482.
1678043.
394642.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*u* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
211.
0.
105.
632.
71.
120.
5.
29.
498.
31.
710.
0.
195.
3505.
183.
1699.
0.
156.
3123.
372.
23.
12.
15.
60.
5.
1301.
0.
453.
3624.
380.
0.
0.
0.
0.
0.
1688.
13.
234.
3279.
432.
*10*
S.D.
0.
27288.
18129.
14375.
1785.
S.D.
0.
1202405.
114964.
137399.
25753.
NUMBER
1.
6.
2.
12.
7.
NUMBER
1.
7.
7.
7.
6.
*11*
*12*
6.
2.
3.
14.
2.
3014.
0.
3014.
3014.
0.
3150.
0.
3150.
3150.
0.
1750.
0.
1010.
6061.
543.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*K* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
34.
0.
19.
115.
11.
3.
1.
1.
20.
1.
136.
0.
26.
473.
35.
61
0
to
197
14
9.
2.
4.
16.
3.
109.
0.
36.
288.
33.
0.
0.
0.
0.
0.
43.
1.
6.
90.
11.
*10*
6.
0.
6.
6.
0.
*11*
313.
0.
313.
313.
0.
*12*
76.
0.
44.
266.
23.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
MONTANA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 28
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
2500.
5947.
6415568.
429254.
1244030.
MINIMUM
25.
8.
26824.
1232.
U638.
AVERAGE
35U.
536.
767456.
49299.
1U6766.
TOTAL
9901.
14996.
21488768.
1380360.
4109435.
S.D.
595.
1139.
1285824.
82146.
242620.
O£M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1380360.
1074438.
1654634.
TOTAL
4109432.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
00
o
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
0.
429254.
86064.
35396.
9626.
MAXIMUM
8019460.
3728195.
737229.
279671.
83932.
MINIMUM
0.
105382.
50485.
10046.
1232.
AVERAGE
0.
220195.
71515.
23747.
3684.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
8019460. 8019460.
1002785. 1779705.
535361. 693714.
119040. 185672.
33530. 59085.
TOTAL
0.
660585.
429093.
261218.
29468.
TOTAL
8019460.
12457939.
4855995.
1114029.
413594.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *n* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
139.
0.
72.
430.
46.
91.
4.
22.
372.
24.
577.
0.
154.
2774.
149.
1281
0
117
2338
281
20.
10.
13.
52.
5.
1110.
0.
391.
3129.
322.
*10*
S.D.
0.
181342.
14784.
93«4.
2719.
S.D.
0.
947238.
70693.
62250.
21334.
NUMBER
0.
3.
6.
11.
8.
NUMBER
1.
7.
7.
6.
7.
*11*
*12*
0.
0.
0.
0.
0.
1404.
11.
199.
2788.
361.
5.
2.
3.
11.
2.
2419.
0.
2419.
2419.
0.
2620.
0.
2620.
2620.
0.
1316.
0.
759.
4556.
408.
MAX
MIN
AVE
TOT
SD
25.
0.
14.
85.
8.
*2*
2.
0.
1.
17.
*3*
101.
0.
19.
341.
27.
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS ($ 1000)
*£l* *5* *6* *7* *8* *9*
47.
0.
8.
150.
11.
7.
2.
3.
12.
2.
86.
0.
29.
231.
26.
0.
0.
0.
0.
0.
34.
1.
5.
75.
9.
1.
0.
0.
2.
0.
*10*
5.
0.
5.
5.
0.
*11*
261.
0.
261.
261.
0.
*12*
57.
0.
34.
201.
18.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER PF M 4NUF4C TUR 1NC PUNTS...
NFBR BSK •
FLOW AT OBSERVtC 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
86
CO
M4NUF4CTURING EMPLOYMENT
FI OW « MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL CCST
COST RANGE
> 5COCOC.
100000. TO
50COO. TO
10000. TO
0. TO
500000.
ICOOOO.
50000.
10000.
CCST RANGE
> 5000GOC.
100COOO. TO 5000000.
500000. TC 1COOOOO.
10000C. TO 5CCOOO.
0. TO 10000C.
MIN
AVF
TOT
SO
*1*
78.
0.
52.
157.
27.
*2*
324.
1 .
28.
1391 .
6? .
MAXIMUM
52CO.
2682.
3035788.
193228.
579773.
OSM
1462662.
MINIMUM
6.
5.
11802.
<576.
2834.
ANNUAL COST OF V,ASIE
REPL&CfcMENT
U19CCS.
AVER4GF
355.
235.
260235.
17008.
50058.
TREATMENT
INTEREST
1723273.
TOTAL
30556.
20227.
2238C192.
1462662.
43C4966.
TOTAL
4304944
DISTRIBUTION OF OPERATICN AND MAINTENANCE CCST
MAXIMUM
0.
192223.
78351.
447CG.
9827.
MINIMUM
0 .
16619C.
50012 .
10348.
976.
AVERAGE
0 .
179709.
62129.
23521 .
4515.
TOTAL
0.
359418.
186388.
682095.
234774.
DISTRIBUTION CF INVESTMENT REQUIREMENTS
NAXWJM
0.
3794735.
759521.
48S361.
98967.
DI STRIBITICN
*3* #4*
271. 759.
0 . 0 .
69. 52.
2621. 2307,
57. 143.
MINIMUM
0 .
1073736.
536935.
n2885.
14753.
OF TOT 1L C4PIT4L CCST
*F* #6*
46. 1266.
6. 0.
23. 214.
491. 6.628.
12. ?<;5.
AVERAGE
0.
2277341 .
622902.
21795?.
58512.
FOR TREATMENT (J 1000)
*?* *p*
37. 686.
0. 6.
3?. 1 14.
37. 7089.
0. 137.
TOTAL
0.
11386709.
4983216.
10025769.
1579834.
*9* *10*
17. 0.
0. 0.
5. 0.
144. 0.
5. 0.
S.D.
626.
420.
465084.
29364.
88012.
S.D.
0.
19U9.
14608.
11630.
2479.
S.D.
0.
1214996.
62436.
112348.
24327.
NUMBER
0.
2.
3.
2<3.
52.
NUMBER
0.
5.
8.
46.
27.
*11*
0.
0.
0.
0.
0.
*12*
857.
0,
757.
1515.
141.
MAX
MIN
AVE
TOT
SO
*1*
14.
0.
9.
27.
*2*
* •»*
DISTRIBUTION OF ANN'.JAL 0 £M TREATMENT CCSTS ($ 1000)
#4* #5* *6* *7* *6* *9*
5 .
0 .
1 .
44.
1 .
3f .
C.
6 .
21?.
7.
36.
n.
3.
153.
7.
26.
I .
9.
197.
Q.
l?.5
0
17
529
31
2.
0 .
2.
2.
0.
17.
0 ,
3.
2CS,
3 ,
5.
0.
1 .
*10*
C.
C.
0.
C.
0.
*11*
0.
0.
0 .
0.
0.
*12*
32.
0.
29.
57.
5.
SO OR S.O. PEPRESFNTS ST4NO4RD DFVI1TICN. THF DAT 4 CISTPI RUT I CM IJSEC IS HIGHLY SKEWED.
-------
NEBRASKA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
_,_„ 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 86
MANUFACTURING EMPLOYMENT
FLOW .(MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
5200.
1931.
2413733.
147284.
1*53828.
MINIMUM
6.
5.
11802.
976.
283H.
AVERAGE
355.
175.
213379.
13579.
40678.
TOTAL
30556.
15014.
18350592.
1167779.
3498308.
S.D.
626.
304.
369267.
22553.
69014.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1167779.
917530.
1412994.
TOTAL
3498302.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
UJ COST RANGE
00 > 5000000.
tg 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
0.
147284.
59984.
44814.
9364.
MAXIMUM
0.
3017166.
836291.
487639.
97200.
MINIMUM
0.
126756.
59984.
11168.
976.
AVERAGE
0.
137020.
59984.
22444.
4068.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
1082970. 2048331.
505838. 594188.
100303. 229984.
14753. 60423.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6*
TOTAL
0.
274040.
59984.
605977.
227785.
TOTAL
0.
8193327.
2970938.
9659319.
2114795.
MAX
MIN
AVE
TOT
•SD
57.
0.
41.
122.
17.
254.
1.
22.
1087.
48.
271.
0.
65.
2452.
56.
549.
0.
40.
1768.
107.
37.
6.
20.
417.
11.
1055
0
179
5556
246
7*
37.
0.
37.
37.
0.
*8*
556.
6.
91.
5626.
109.
*9*
c
13.
0.
4.
113.
4.
*10*
0.
0.
0.
0.
0.
S.D.
0.
14516.
0.
10571.
2348.
S.D.
0.
935258.
138302.
121975.
24499.
NUMBER
0.
2.
1.
27.
56.
NUMBER
0.
4.
5.
42.
35.
*11*
0.
0.
0.
0.
0.
*12*
664.
0.
587.
1174.
109.
MAX
MIN
AVE
TOT
SD
*1*
10.
0.
7.
22.
4.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
4.
0.
1.
39.
1.
36.
0.
5.
196.
7.
26.
0.
3.
125.
5.
24.
1.
7.
148.
7.
103.
0.
13
403.
24.
2.
0.
2.
2.
0.
13.
0.
3.
165.
3.
3.
0.
1.
23.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
25.
0.
22.
45.
4.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
NEBRASKA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 86
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
5200.
1325.
1863865.
108113.
344824.
MINIMUM
6.
5.
11802.
976.
2834.
AVERAGE
355.
136.
178486.
11136.
33804.
TOTAL
30556.
11709.
15349814.
957692.
2907102.
S.D.
626.
223.
286451.
17088.
52944.
O&M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
957692.
767491.
1131935.
TOTAL
2907117.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
Urf COST RANGE
CO > 5000000.
CO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
*2*
MAXIMUM
0.
108113.
93119.
44700.
9677.
MAXIMUM
0.
2329831.
818881.
487639.
98583.
MINIMUM
0.
108113.
93119.
10238,
976.
AVERAGE
0.
108113.
93119.
21209.
3834.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1118028.
536935.
111366.
14753.
AVERAGE
0.
1835367.
663205.
245520.
60636.
TOTAL
0.
108113.
93119.
530227.
226232.
TOTAL
0.
5506101.
1989615.
9084237.
2607330.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *U* *5* *6* *7* *8* *9*
41.
0.
32.
95.
9.
192.
1.
18.
858.
36.
271.
0.
60.
2293.
54.
379.
0.
30.
1333.
74.
36.
6.
18.
371.
10.
857
0
152
4711
199
37.
0.
37.
37.
0.
436.
6.
75.
4675,
87.
10.
0.
3.
94.
3.
*10*
0.
0.
0.
0.
0.
S.D.
0.
0.
0.
10556.
2408.
S.D.
0.
635904.
143256.
116901.
23530.
i 'JMEER
0.
1.
1.
25.
59.
NUMBER
0.
3.
3.
37.
43.
*11*
0.
0.
0.
0.
0.
*12*
499.
0.
441.
882.
82.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*1»* *5* *6* *7* *8* *9*
8.
0.
6.
17.
2.
3.
0.
1.
35.
1.
36.
0.
5.
181.
7.
19.
0.
2.
101.
4.
24.
1.
6.
121.
6.
76.
0.
10.
311.
17.
2.
0.
2.
2.
0.
10.
0.
2.
138.
2.
2.
0.
1.
18.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
19.
0.
17.
34.
3.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMRCP OF MANUFACTURING PLANTS...
NEVADA
FLOW &T 08SERVEC 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DCLLARS)
9
MANUF'VCTUR ING EMPLOYMENT
FL CW < MC,Y I
TOTAL CAPITAL COST
TOTflL 1NNU4L OCM COST
TOTAL ANNUAL CCST
MAXIMUM
2528.
H86458.
242557.
393237.
MINIMUM
75.
14.
338CS.
6735.
AVERAGE
328.
563.
325498.
56802.
9814 L.
TOTAL
2955.
5070.
2929486.
511220.
883265.
S.D.
397.
817.
377760.
78806.
126684.
0£M
ANNUAL COST OF KASIF TREATMENT
REPLACEMENT INTEREST
511220.
146474.
225570.
TOTAL
883264.
OISTRIBLTICN OF OPER6TICN 4ND MAINTENANCE CCST
O5
> 5COCCC.
100000. TO ^00000.
50000. TO 100000.
10000. TO 5COTO.
0. TO 1000C.
COST RANGE
> SOOOOOO.
1010000. TO 5CCCOOO.
500000. TO 1000000.
loocco. TO scooor.
0. TO 1COOOO.
MAX
MTN
A VF_
TOT
sn
*i*
*2*
PAXIMUM
75901 .
12215.
£669.
XlfUM
0.
1433072.
726388.
405950.
96633.
MINIMUM
0 .
102360.
52041.
10575.
2441.
AVERAGE
0.
172458.
65971.
11405.
3851 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0 .
1433072 .
564677.
11297C).
42261.
AVERAGE
0.
1483072 .
645533.
238856.
57052.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ lOCOt
*4*
*';*
0.
0 .
n.
0.
0.
1 71.
0 .
73 .
20?.
71 .
6^0.
3? .
221 .
1986.
2 2<>.
326.
0.
73.
581.
111.
0.
0.
0.
0.
0.
* e#
0.
c.
0.
0.
c.
*7* -
0.
0.
0.
0 .
0.
*«*
71,
71 ,
71.
71 ,
0.
TOTAL
0.
344917.
131942.
22810.
11552.
TOTAL
0.
1483072.
1291065.
716567.
171155.
0.
0.
0.
0.
0.
*10*
c.
0.
c.
0.
0.
S .0.
0.
99134.
19700.
1174.
2441.
S.D.
0.
0.
1 14351.
150772.
25618.
NUMBER
0.
2.
2.
2.
3.
NUMBER
0.
1.
2.
3.
3.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0,
DISTRIBUTION OF ANNUAL
MAX
MIN
4VE
TOT
sn
0.
c.
0.
0.
0.
*?*
7 .
0 .
13 .
190. 46,.
2. 0.
45. 11.
409. 86.
67. 16.
0.
0.
0.
0.
0.
TFt/TMENT CCSTS ($ 10001
*7* *8*
0.
0 ,
0.
0.
0.
0.
0.
0.
0.
0.
3.
3,
3 ,
3.
0,
0.
0.
0 .
0.
0.
*10*
0.
c.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
S.^. REPRESENTS STAMOART OVlAriCN. THF DATA CISTR18UT ION USED IS HIGHLY SKEWED.
-------
NEVADA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 9
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
1330.
2528.
1186458.
242557.
393237.
MINIMUM
75.
14.
33809.
2441.
6735.
AVERAGE
328.
511.
298983.
52070.
90041.
TOTAL
2955.
4595.
2690841.
468633.
810370.
S.D.
397.
821.
380673.
79098.
127366.
06M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1*68633.
13451)2.
207195.
TOTAL
810370.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
t_l COST RANGE
00 > 5000000.
CO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
*2*
MAXIMUM
0.
242557.
55691.
43605.
7064.
MAXIMUM
0.
1483072.
726388.
427596.
86633.
MINIMUM
0.
102360.
55691.
43605.
2441.
AVERAGE
0.
172458.
55691.
43605.
4884.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
1483072. 1483072.
726388. 726388.
127712. 303309.
42261. 61042.
TOTAL
0.
344917.
55691.
43605.
24421.
TOTAL
0.
1483072.
726388.
909927.
244169.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
171.
0.
71.
284.
73.
690.
32.
202.
1817.
222.
326.
0.
68.
545.
112.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
45.
45.
45.
45.
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
0.
99134.
0.
0.
2276.
S.D.
0.
0.
0.
156388.
22388.
NUMBER
0.
2.
1.
1.
5.
NUMBER
0.
1.
1.
3.
4.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
0.
0.
0.
0.
0.
*2*
7.
0.
3.
13.
3.
*3*
190.
2.
41.
373.
62.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
46.
0.
10.
81.
16.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
2.
2.
2.
2.
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
NEVADA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 9
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
1330.
2480.
1169742.
238486.
387043.
MINIMUM
75.
1U.
33809.
2441.
6735.
AVERAGE
328.
437.
261292.
44959.
78143.
TOTAL
2955.
3934.
2351625.
404633.
703290.
S.D.
397.
819.
380086.
78958.
127168.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
404633.
117581.
181075.
TOTAL
703289.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CO
05
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
*2*
MAXIMUM
0.
238486.
0.
22231.
6669.
MAXIMUM
0.
1462177.
716519.
212762.
86633.
MINIMUM
0.
100659.
0.
21295.
2441.
AVERAGE
0.
169573.
0.
21763.
4392.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1462177.
716519.
109696.
42261.
AVERAGE
0.
1462177.
716519.
176142.
58103.
TOTAL
0.
339145.
0.
43526.
21962.
TOTAL
0.
1462177.
716519.
528426.
232411.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
168.
0.
66.
264.
76.
682.
32.
174.
1562.
219.
320
0
61
487
112
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
38.
38.
38.
38.
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
0.
97459.
0.
662.
1935.
S.D.
0.
0.
0.
57644.
21023.
N.UMBER
0.
2.
0.
2.
5.
NUMBER
0.
1.
1.
3.
4.
+ 11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
0.
0,
0.
0 .
0.
*2*
6.
0.
3.
12.
3.
*3*
187.
2.
35.
318.
62.
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS ($ 1000)
+4* *5* *6* *7* *8* *9*
45.
0.
9.
72.
16.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
2.
2.
2.
2.
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION*
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NU"PER r.f PAMI FACTOR INT PLANTS
Fl OW
196fl FLOW
92
NEh HAMPSHIRE
AT OBSERVED 1968 LEVEL
CONDITICNS ( 1967 DCLLARSI
MANUFACTURING Ef-TICYMENT
Ft. OW (Mf,Y)
TOTAL CAPITAL COST
TOTAL ANNUAL OGM COST
TOT^L 4NNU4L COST
5900.
33'.6 1.
1232481.
41C2133.
MI NI MUM
26.
5.
16813.
701.
3092.
AVERAGE
519.
708.
b50479,
27675.
97587.
TOTAL
47786.
65095.
50644096.
2546131.
8977988.
S.D.
781.
4034.
2369062.
129239.
429953.
2546131.
1NNU4L COST OF W4STE
REPLACEMENT
2532204.
TREATMENT
INTEREST
3899593.
TOT AL
6977928.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST R4NGE
> 500000.
100COO. TO
50000. TO
icocn. ie
0. TO
5CCOQO.
100000.
50000.
ICOOO.
COST R4NGE
> 5000010.
ICOOOOO. TO 5CCOOOO.
500000. TO 1COCOOO.
100000. TC 500000.
0. TO 1COOOC.
MAX
M!N
AVE
TOT
SO
1*
MAXIMUM
1232981,
14C035,
43396.
"5534.
fi XIMUM
2P.239616.
3828667.
MINIMUM
1232981.
120735.
53013.
10154.
701 .
AVERAGE
1232981.
127357.
56726 .
17931.
4000 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
4932 15.
99396.
MINIMUM
2823S6<;6.
1019552.
539426.
104U3.
21016.
4VER4GE
28239696.
1893000.
618087.
283355.
59435.
TOTAL
1232981.
382071.
113452.
60S662.
207994.
TOTAL
28239696.
15144COO.
7417048.
10484149.
202C780.
DISTRIBUTION OF TTTAl CAPITAL CCST FCR TREATMENT ($ 1000)
* *4* *5* *6* *7* *8* *9*
9.
0.
q .
9.
0.
242 .
2.
21 .
°13 .
40.
497 .
0.
9? .
4984.
1C2.
7422.
0.
152.
10472.
PS?.
32.
6.
14.
141.
8.
2871 .
0.
340.
1?930.
451.
0.
0.
0.
0.
0.
4290.
8 .
209.
13143.
550.
7.
0.
2.
42.
2,
*1C*
0.
C.
0.
0.
0.
S.D.
0.
10983.
5252.
9102.
26C8.
S.O.
0.
1004973.
81130.
129992.
24199.
NUMBER
1.
3.
2.
34.
52.
NUMBER
1.
8.
12.
37.
34.
*11*
8009.
0.
8009.
8009.
0.
*12*
0.
0.
0.
0.
0.
M JX
MIN
AVF
TOT
SO
* t*
1.
0.
1.
1.
0.
3.
0 .
1.
27 .
0.
*3*
0.
5.
261 .
6 .
DISTR1BUT1CN OF
*4* *"><
167.
0 .
5.
357.
22.
15.
1 .
4.
39.
5.
tt» TPFSTMENT COSTS ($ 1000)
*t<= *7* * 8* *9*
295.
C.
24.
9C6.
50.
3 .
0.
0.
0.
0.
131 .
0.
5,
328 .
17.
2 .
0.
0.
7.
0.
*10*
0.
0.
C.
0.
C.
*11*
620.
0.
620.
620.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.C. REPRESENTS STANDARD CEVIATION. THE DATA DISTRIBUT1CN USED IS HIGHLY SKEWED.
-------
NEW HAMPSHIRE
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
m^,,T „, 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 92
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
•_! COST RANGE
CO > 5000000.
OS 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 10 0 00 0 .
MAX
MIN
AVE
TOT
SD
*1*
9.
0.
9.
9.
0.
*2*
242.
2.
20.
869.
HO.
MAXIMUM
5900.
38463.
22591760.
1232981.
14102133.
06M
2499774.
MINIMUM
26.
5.
16813.
701.
3092.
ANNUAL COST OF WASTE
REPLACEMENT
2492098.
AVERAGE
519.
698.
541761.
27171.
95976.
TREATMENT
INTEREST
3837829.
TOTAL
47786.
64179.
49841968.
2499774.
8829758.
TOTAL
8829701
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
1232981.
140035.
60439.
43386.
9655.
MINIMUM
1232981.
120735.
53013.
10014.
701.
AVERAGE
1232981.
127357.
56726.
18265.
4239.
TOTAL
1232981.
382071.
113452.
529672.
241625.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
28239696.
3828667.
723045.
493215.
99396.
DISTRIBUTION
*3* *4*
497. 7422.
0. 0.
93. 151.
4733. 10391.
100. 892.
MINIMUM
28239696.
1019552.
500541.
104163.
21016.
OF TOTAL CAPITAL COST
*5* *6*
32. 2871.
6. 0.
14. 335.
141. 12734.
8. 492.
AVERAGE
28239696.
1893000.
593161.
264687.
59058.
FOR TREATMENT ($ 1000)
*7* *8*
0. 4290.
0. 8.
0. 205.
0. 12917.
0. 551.
TOTAL
28239696.
15144000.
7117930.
9793403.
2007973.
*9* *10*
6. 0.
0. 0.
2. 0.
39. 0.
1. 0.
S.D.
781.
4036.
2369994.
129292.
430131.
S.D.
0.
10983.
5252.
9326.
2691.
S.D.
0.
1004973.
89042.
128510.
23975.
NUMBER
1.
3.
2.
29.
57.
NUMBER
1.
8.
12.
37.
34.
*11*
8009.
0.
8009.
8009.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
1 .
0.
1.
1.
0.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
3.
0.
1.
26.
0.
27,
0.
5.
239.
6.
187.
o.
5.
351.
23.
15.
1.
4.
39.
5.
295
0
24
894
50
0.
0.
0.
0.
0.
131.
0.
5.
323.
17.
1.
0.
0.
6.
0.
*10*
0.
0.
0.
0.
0.
*11*
620.
0.
620.
620.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
NEW HAMPSHIRE
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 92
OS
<£>
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O£M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
9.
0.
9.
9.
0.
*2*
242.
2.
20.
851.
40.
MAXIMUM
5900.
28884.
18275888.
995540.
3316577.
OEM
2097133.
MINIMUM
26.
5.
16813.
701.
3092.
ANNUAL COST OF WASTE
REPLACEMENT
2141776.
DISTRIBUTION OF OPERATION
MAXIMUM
995540.
121301.
95221.
47810.
9901.
MINIMUM
995540.
110376.
95221.
10521.
701.
AVERAGE
519.
543.
465604.
22795.
81927.
TREATMENT
INTEREST
3298334.
AND MAINTENANCE COST
AVERAGE
995540.
115839.
95221.
20503.
4664.
TOTAL
47786.
49961.
42835536.
2097133.
7537302.
TOTAL
7537243
TOTAL
995540.
231677.
95221.
471564.
303157.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
22844848.
3828667.
910786.
477357.
99396.
DISTRIBUTION
*3* *4*
497. 5596.
0. 0.
91. 118.
4619. 8142.
100. 674.
MINIMUM
22844848.
1063256.
515020.
104163.
21016.
AVERAGE
22844848.
1949765.
664529.
272524.
57846.
TOTAL
22844848.
11698591.
5316235.
11718552.
1966766.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
32. 2450.
6. 0.
14. 293.
141. 11127.
8. 425.
*7* *8*
0. 3568.
0. 8.
0. 179.
0. 11250.
0. 460.
*9* *10*
5. 0.
0. 0.
2. 0.
36. 0.
1. 0.
S.D.
781.
3033.
1924443.
101490.
348744.
S.D.
0.
7725.
0.
11018.
. 2892.
S.D.
0.
1037678.
138668.
128277.
22727.
NUMBER
1.
2.
1.
23.
65.
NUMBER
1.
6.
8.
43.
34.
*11*
6662.
0.
6662.
6662.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
1.
0.
1 .
1.
0.
3.
0.
1.
26.
0.
27.
0.
4.
227.
5.
144.
0.
4.
285.
17.
15.
1.
4.
39.
5.
233.
0.
19.
727 .
40.
0.
0.
0.
0.
0,
100.
0.
4.
269.
13.
1.
0.
0.
5.
0.
*10*
0.
0.
0.
0.
0.
*11*
518.
0.
518.
518.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PMNTS...
Fl 3W
1968 Fl nW
702
NFW JERSEY
AT OBSERVED 1968 LEVEL
CONDITIONS ( 1967 DOLLARS)
MAMUF ACTIJP ING EMPLOYMENT
FLOW (NIGV)
TITiL C. HPITSL COST
TOTAL /WNUAL C£M CCST
TOTAL ANNUAl CCST
COST PAMGE
> 500000.
100000. TO
50000. TO
10000. TO
C. Tf
500000.
1COOOC.
50000.
10000.
COST RANGF
> 500CCOO.
1000000. TO 5000000.
500nCC. TO ICCOOOC.
100000. TO 500000.
0. TO 100000.
MAX
M{N
4V E
TOT
SO
5925.
0.
170.
14965.
741.
*2*
P61 .
1 .
19.
9P53 .
49.
K A X I M U •*
15000.
11776.
203CCC64.
8C5 8«9 .
3387995.
OEM
14783227.
DISTR
MX i fat*
8 T- 8 F 9 .
34P367.
98C79.
493?2.
9930.
"I MMUM
1 E.
3.
9055.
8CC.
2026.
ANNUAL COST OF WASTE
REPLACEMENT
1246235S.
4VFR4GE
519.
256.
355053.
21059.
66147.
TREATMENT
INTEREST
1919201 t.
TOTAL
364170.
179452.
24924720C.
14783227.
46435264.
TOTAL
46437600
IBUTION OF OPERATICN AM) MAINTENANCE CCST
MINIMUM
555945.
107140.
50706.
10001.
800.
4VER4GE
658501 .
196940.
68750.
20009.
5186.
TOT4L
1975504.
3938803.
1856237.
4902187.
211C571 .
DISTRIBUTION OF INVESTMENT RECU IREM ENTS
P'AXIf'UM
25375C72.
396C036.
963821.
497559.
96547.
DISTRIBUTION
*3* *4*
1313. 2576.
0 . 0 .
127. 35.
572?"^. 15802.
173. 128.
M IN [MUM
6168320.
1022256.
500009 .
10C448.
I 1319.
OF TOT4L C4PIT4L CCST
*5* *fc*
101. 27^5.
5. 0.
20. 159.
2128. 53249.
15. 213.
AVERAGE
13525530.
1867047.
683479.
226683.
65698.
FCR TREATMENT ( $ 1000)
*7* *8*
40. 2558.
0. 4.
40. 115.
120. 47175.
0. 177.
TOTAL
81153184.
70947792 .
54678336.
94073488.
10708712.
*S* *10«
22. 2050.
0. 0.
3. 205C.
423. 2050.
3. 0.
s.o.
1034.
752.
1 140724.
55692.
198005.
S.O.
133831.
75078.
13831.
5496.
2501.
S.D.
7025111.
765354.
134232.
100328.
23275.
NUMBER
3.
20.
27.
245.
407.
NUMBER
6.
38.
80.
415.
163.
*11*
0.
0.
0.
0 .
0.
*12*
12469.
0.
4783.
43044.
3951.
*?*
CISTRIBUTfCN OF ANNUAL OEM TREATMENT COSTS (t 1COO)
*7* *8* *9*
MAX
MIN
AVF
TOT
SD
202.
C.
L I .
970.
30 .
9.
0 .
1 .
381 .
1 .
2^1 .
0.
12.
52 Ml.
27.
80.
0.
3.
1569.
6.
64.
0.
6.
624.
8.
288
C
10
3207
22
2.
0.
2.
5.
0.
66.
0 .
3.
1289,
5.
6.
0 .
1.
81.
1.
*10*
4.
0.
4.
4.
0.
0.
0.
0.
0.
0.
*12*
396.
0.
155.
1392.
125.
SO OR S.O. REPRESENTS STANDARD DEVIATION.
THE DATA OISTRIEUTICN USED IS HIGHLY SKEWED.
-------
NEW JERSEY
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 702
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
i_j COST RANGE
C£> > 5000000.
H* 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
2865.
0.
96.
8455.
362.
*2*
861.
1.
18.
8589.
47.
MAXIMUM
15000.
11776.
12905840.
556640.
2195681.
OSM
13175049.
MINIMUM
18.
3.
9055.
800.
2026.
ANNUAL COST OF WASTE
REPLACEMENT
11070411.
DISTRIBUTION OF OPERATION
MAXIMUM
556640.
419346.
98079.
49332.
9930.
MINIMUM
555945.
100192.
50706.
10001.
800.
AVERAGE
519.
229.
315396.
18768.
58820.
TREATMENT
INTEREST
17048416.
AND MAINTENANCE COST
AVERAGE
556293.
176754.
69888.
20137.
5113.
TOTAL
364170.
160956.
221408240.
13175049.
41291552.
TOTAL
41293872
TOTAL
1112585.
3535086.
1607415.
4772451.
2147589.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
16132300.
4211310.
963821.
497958.
98547.
DISTRIBUTION
*3* *n*
1313. 2576.
0. 0.
118. 32.
53116. 18051.
150. 122.
MINIMUM
6419552.
1022296.
507642.
100448.
11319.
AVERAGE
10648777.
1773817.
688470.
222618.
66056.
TOTAL
53243888.
69178896.
50946800.
92163840.
11229437.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
101. 2755.
5. 0.
20. 156.
2099. 52215.
14. 214.
*7* *8*
40. 2558.
0. 4.
40. 113.
120. 46363.
0. 177.
*9* +10*
22. 2050.
0. 0.
3. 2050.
417. 2050.
3. 0.
S.D.
1084.
66lt.
819909.
43803.
11*6014.
S.D.
572.
72407.
13180.
9936.
2453.
S.D.
4202903.
783185.
134802.
99473.
23292.
*11*
0.
0.
0.
0.
0.
NUMBER
2.
20.
23.
237.
420.
NUMBER
5.
39.
74.
414.
170.
*12*
8671.
0.
3326.
29932.
2747.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
138.
0.
8.
743.
20.
9.
0.
1.
371.
1.
182.
0.
10.
4575.
21.
80.
0.
3.
1422.
6.
64.
0.
6.
606.
8.
288
0
9
3126
22
2.
0.
2.
5.
0.
66.
0.
3.
1264.
5.
6.
0.
1.
79.
1 .
*10*
4.
0.
K.
4.
0.
*11*
0.
0.
0.
0.
0.
*12*
278.
0.
109.
978.
88.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
NEW JERSEY
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 702
C£>
CO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
1666.
0.
66.
5817.
213.
*2*
861.
1.
17.
8029.
46.
MAXIMUM
15000.
11776.
10062441.
555915.
1833873.
OSM
11917980.
MINIMUM
18.
3.
9055.
800.
2026.
ANNUAL COST OF WASTE
REPLACEMENT
10015506.
DISTRIBUTION OF OPERATION
MAXIMUM
555945.
414862.
98395.
49332.
9996.
MINIMUM
555945.
110499.
50370.
10021.
800.
AVERAGE
519.
208.
285342.
16977.
53212.
TREATMENT
INTEREST
15423873.
AND MAINTENANCE COST
AVERAGE
555945.
180756.
72256.
20585.
4904.
TOTAL
364170.
145911.
200310144.
11917980.
37355104.
TOTAL
37357344
TOTAL
555945.
3253606.
1589634.
4302272.
2216587.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
12578051.
4747541.
963821.
497958.
99717.
DISTRIBUTION
*3* *4*
1313. 2576.
0. 0.
110. 30.
49783. 16875.
141. 121.
MINIMUM
8H93250.
1017(455.
5076142.
1004«8.
11319.
AVERAGE
10875664.
1860543.
687235.
212952.
65806.
TOTAL
32626992.
72561184.
48106432.
84329184.
12766434.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
101. 2755.
5. 0.
20. 147.
2049. 48937.
15. 212.
*7* *8*
40. 2558.
0. 4.
40. 106.
120. 43761.
0. 175.
*9* *10*
22. 2050.
0. 0.
3. 2050.
388. 2050.
3. 0.
S.D.
1084.
630.
676675.
38548.
122714.
S.D.
0.
77521.
15664.
10441.
2396.
S.D.
2125631.
960806.
137134.
96594.
23135.
NUMBER
1.
18.
22.
209.
452.
NUMBER
3.
39.
70.
396.
194.
*11*
0.
0.
0.
0.
0.
*12*
6517.
0.
2500.
22499.
2065.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS <$ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
102.
0.
7.
619.
15.
9.
0.
1.
356.
1.
175.
0.
9.
4159.
20.
80.
0.
2.
1310.
5.
64.
0.
6.
586.
8.
288
0
9
2875
21
2.
0.
2.
5.
0.
66.
0.
3.
1191.
5.
6.
0.
0.
72.
1.
*10*
4.
0.
4.
4.
0.
*11*
0.
0.
0.
0.
0.
*12*
211.
0.
82.
741.
66.
SD OR S.D.
RKPRSSENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PI ANTS...
NEW ME* ICO
Fl HW 4T OBSERVED 1968 LEVEL
i960 FLOW CONDITION; i i<567 DCLLARSI
12
M4NUF \CTUR ING EMPLOYMENT
FLOW "JO'IOCO.
100000. TO
5000C. TP
10COO. TO
o. TO
500000.
ICOOOO.
5coor.
10000 .
COST RAMGC
> 50CCCCC.
1000000. TP 5COOOOO.
500000. TO 1000000.
IOOCCO. TO 50Cnoc.
0. TO 100000.
DISTRIBUTION' OF HPERATICN
MAXIMUM MINIMUM
575?3C. 575230.
I^e87<3. 158879.
H3337. 55470.
41961. 13692.
S123. 1180.
MAINTENANCE CCST
AVERAGE
575230.
188878 .
66839.
27826.
6504 .
f AXI-UM
0.
467637C.
DISTRIBUTION CF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0 . 0.
1039726. 2681215.
557523. 557523.
1U742. 186950.
33461. 33461.
cisTRifiuTic\ OF TOTAL CAPITAL CCST FCR TREATMENT ($ loco)
TOTAL
575230.
198878.
200517.
55653.
32522.
TOTAL
0.
13406C79.
557523 .
934749.
33461 .
MAX
M1N
A VE
TOT
SD
*1*
460.
0 .
IPI.
724.
189.
*?*
?P9.
! .
50.
44' .
91 .
*3*
1416.
0.
343 .
274C.
4C1 .
*4*
lice.
0.
164.
13CH.
179.
*?*
1 P.
15.
16.
33.
2.
*f*
622 .
0.
277 .
830.
300.
*7*
0.
0.
0.
0.
0.
*8*
103
11
66
331
38
*9*
*io*
S.D.
0.
0.
14625.
1S989.
3196.
S .0.
0.
1687208.
0.
63844.
0.
*u*
NUMBER
1.
I.
3.
2.
5.
NUMBER
0.
5.
I.
5.
1.
*12*
4.
3 .
4.
e .
i .
0.
0.
c.
0.
Q _
C.
0 .
0.
0.
0.
2794.
0.
1381.
5525.
976.
*1*
*?*
* ~>*
DISTRIBUTION 3F ANN'IAL 0£M TRtATMENT CCSTS (t 1000)
*^* *f* *6* *7* *ft* *q*
MAX
MIN
AVE
TOT
SD
46.
0.
2?.
P°.
16.
7 .
1 .
2 .
14.
7 .
3 7<- .
r.
64 .
5 14 .
129.
91
n
15
I 18
34
5.
•\.
4.
8 .
1.
0.
34.
1C1 .
49.
C.
j ,
0.
0.
0 .
3 .
1 .
2 .
10.
1 ,
*10*
0.
0.
0.
c.
c.
* 11*
0 .
0.
0.
0.
0.
*12*
99.
0.
50.
199.
34.
SD PP S.D. REPRESENTS STANTAPC CEViaTlCN. THE CAT 1 01STRI BUT [CN USCU IS M1GHIY SKEWED.
-------
NEW MEXICO
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
mnfn 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 12
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
700.
5046.
2217895.
26H271.
493109.
MINIMUM
214.
9.
24702.
1088.
4225.
AVERAGE
160.
599.
587218.
44970.
119547.
TOTAL
1921.
7192.
7046613.
539642.
1434562.
S.D.
186.
1417.
728761.
75765.
160978.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
539642.
352331.
542589.
TOTAL
1434561.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*2*
MAXIMUM
0.
264271.
50142.
33441.
9658.
MAXIMUM
0.
2772368.
834098.
297178.
30878.
MINIMUM
0.
113255.
50142.
11316.
1088.
AVERAGE
0.
188763.
50142.
23364.
6980.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1237003.
637885.
131742.
30878.
AVERAGE
2087238.
735992.
173949.
30878.
TOTAL
0.
377526.
50142.
70092.
41883.
TOTAL
0.
6261714.
1471983.
1043692.
30878.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
207.
0.
87.
348.
82.
150.
5.
28.
251.
46.
810.
0.
199.
1590.
256.
461
0
69
550
159
18.
15.
16.
33.
2.
382.
0.
196.
588.
163.
0.
0.
0.
0.
0.
103.
10.
66.
329.
39.
4.
3.
4.
8.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
S.D.
0.
106785.
0.
11193.
3174.
S.D.
0.
78088M.
138744.
62027.
0.
NUMBER
0.
2.
1.
3.
6.
NUMBER
0.
3.
2.
6.
1.
*12*
1694.
0.
837.
3350.
592.
MAX
MIN
AVE
TOT
SD
*1*
27.
0.
13.
52.
10.
*2*
4.
1.
1.
9.
1.
*3*
172.
0.
29.
230.
58.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
44.
0.
7.
53.
15.
5.
3.
4.
8.
1.
44.
0.
18.
54.
22.
0.
0.
0.
0.
0.
3.
1.
2.
10.
1.
1.
1.
1.
1.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
61.
0.
31.
122.
21.
SD
OB S.D.
'S STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
NEW MEXICO
PLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS C 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 12
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
70C.
3795.
1657995.
205812.
392741.
MINIMUM
24.
7.
21273.
938.
3640.
AVERAGE
160.
443.
458517.
34431.
92667.
TOTAL
1921.
5320.
5502565.
413177.
1112002.
S.D.
186.
1066.
560761.
58761.
124963.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
413177.
275128.
423697.
TOTAL
1112002.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
0.
205812.
84665.
37564.
9123.
MINIMUM
0.
205812.
84665.
19024.
938.
AVERAGE
0.
205812.
84665.
27225.
5861.
TOTAL
0.
205812.
84665.
81674.
41026.
S.D.
0.
0.
0.
9453.
2517.
NUMBER
0.
1.
1.
3.
7.
uj COST RANGE
<£> > 5000000.
CH 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*2*
MAXIMUM
0.
2072493.
933656.
484302.
93221.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1839857.
631814.
100019.
26591.
AVERAGE
0.
1956175.
782735.
213429.
59906.
TOTAL
0.
3912350.
1565470.
1280574.
119811.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *u* *5* *6* *7* *8* *9*
S.D.
0.
164495.
213432.
150482.
47115.
NUMBER
0.
2.
2.
6.
2.
*10*
*11*
*12*
MAX
MIN
AVE
TOT
SD
136.
0.
59.
238.
52.
121.
3.
22.
202.
37.
677.
0.
160.
1280.
216.
348.
0.
51.
408.
120.
16.
13.
15.
29.
2.
326
0
175
524
135
0.
0.
0.
0.
0.
94.
9,
59.
296.
36.
4.
3.
3.
7.
1.
0.
0.
0.
0.
0.
1273.
0.
629.
2518.
445.
MAX
MIN
AVE
TOT
SD
*1*
20.
0.
10.
39.
7.
*2*
3.
0.
1.
8.
1.
*3*
133.
0.
22.
173.
45.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*!}* *5* *6* *7* *8* *9*
34.
0.
5.
40.
12.
4.
3.
3.
7.
1.
35.
0.
15.
44.
17.
3.
1.
2.
9.
1.
1.
0.
1 .
1.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
46.
0.
23.
92.
16.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL MIN'PEK TF MANUFACTURING Pt ANTS . . .
NF h VCRK
FLOW AT OBSERVED 1968 LEVE1
1968 FLOW CONOITICNS ( 1967 CTLLARS)
F73
MANUFACTURING EMPIOYNFKT
FLOW 501010.
TP
TO
lonon. TO
i. TO
ccccrr.
nooor.
50000.
10000.
<£> COST q &NGF.
O5 > r'C 00000.
irrnoOO. TP "OlOOOO.
500000. TO 1COOOT">.
10^000. TO 50000C.
r. TO iccoon.
MAX
M IN
AVF
TOT
SO
*1 *
*?*
MAXTKUM
472 IT3U
469437.
•3 8 2 ? 4 .
9966.
yixiMUM
10*15 IS 72.
4 I 2 45 R,? .
<^6482.
49231??.
99972.
MINI'
5604C9.
10 5625 .
5C052.
10121.
20.
0 ISTRIPUT ION OF
MINIMUM
INVES
AVERAGE
2855633.
21 1978.
66646.
21506.
4761 .
REQUIREMENTS
1017034.
50C5R8.
H0448.
2152 .
33275392.
1722558.
67 1428 .
214930.
63214.
TOTAL
11422532.
6995290.
2399239.
5699C87.
2547330.
TOTAL
299478528 .
98185H40.
55057104.
101662000.
15929971.
DISTRIBUTION! OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
f -ti,* * 5* *(,* *7» *8* *9*
S.D.
2182380.
101885.
134QO.
10108.
2508.
S.O.
42125088.
694701.
1292t8.
100655.
24360.
NUMBER
4.
33.
36.
265.
535.
NUMBER
9.
57.
82.
473.
252.
*10*
*11*
12606.
1829.
0.
24 .
14101 .
II7.
64 *r .
0.
14?.
76580.
419.
7529.
0.
87.
522^1 .
5 38.
151.
5.
23.
2111 .
21.
3Cf 7.
0.
73051.
310.
*12*
4').
0 .
42.
83.
10.
4557.
5 .
138.
69272.
305 .
33.
0.
3.
819.
4.
16948.
0.
16948.
16948.
0.
8508.
0.
8508.
8508.
0.
3193.
0.
1936.
3872.
1777.
AVF
TOT
SD
967 .
43 .
3 .
1 .
5^7 .
3C?5.
C .
74 .
i 2 rac,.
1 87 .
OISTRI3UTI CN OF •\NIVJ I
*4* #^*
56?.
6.
3794.
160.
t.
9.
IP.
C£f TREtfMEMT COSTS ($ 1000 I
38? .
0.
14 .
18 .
*7*
*fl*
* q*
*10*
*11*
*12*
3.
J.
-1
L •
4.
I .
I '.7 .
0.
4 .
216i .
12.
18.
0.
1 .
195.
2.
21.
0.
21.
21.
C.
725.
0.
725.
725.
0.
1C4.
0.
65.
129.
55.
tiP •=,.'•:.
PVPPFSFtTS
rtVIATDN. THE nATA D t i TR I i3U T I C \! USED IS HIGHLY SKEWED.
-------
NEW YORK
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 873
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
36300.
44147.
41332192.
3158657.
8407844,
MINIMUM
3.
0.
1721.
20.
238.
AVERAGE
681.
415.
399281.
27614.
78327.
TOTAL
594332.
362392.
348572160.
24107184.
68379136.
S.D.
2088.
2548.
2219833.
163497.
443852.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
24107184.
17428592.
26840032.
TOTAL
68375808.
CD
•a
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION AND
MAXIMUM MINIMUM
3158657. 560409.
434288. 101828.
98284. 50052.
48677. 10121.
9966. 20.
MAINTENANCE COST
AVERAGE
2074445.
189353.
67641.
21296.
4712.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE
51665232. 5027460. 22128800.
4124582. 1017039. 1733502.
992622. 510207. 692506.
492392. 100448. 210847.
99972. 2152. 63807.
TOTAL
8297780.
6059286.
1893950.
5196341.
2662250.
TOTAL
177030512.
91875632.
51245408.
98254496.
17355632.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *A* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
29195.
0.
1101.
61680.
5457.
1305.
0.
21.
12019.
89.
4806.
0.
125.
66539.
319.
7529.
0.
73.
43907.
432.
151.
5.
23.
2099.
21.
3087
0
189
71843
310
49.
0.
42.
83.
10.
4557.
5.
135.
67538.
296.
*10*
S.D.
1300199.
92306.
14337.
9389.
2438.
S.D.
19865664.
741462.
142803.
100609.
24168.
NUMBER
4.
32.
28.
244.
565.
NUMBER
8.
53.
74.
466.
272.
*11*
*12*
21.
0.
3.
705.
3.
10781.
0.
10781.
10781.
0.
8508.
0.
8508.
8508.
0.
2220.
0.
1450.
2899.
1090.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
666.
0.
32.
1767.
124.
30.
0.
1.
502.
2.
2006.
0.
18.
9548.
125.
374.
0.
5.
3101.
24.
160.
1.
9.
791.
18.
388
0
14
5354
38
3.
0.
2.
n.
1.
147.
0.
4.
2055.
10.
8.
0.
1.
149.
1.
*10*
15.
0.
15.
15.
0.
*11*
725.
0.
725.
725.
0.
*12*
73.
0.
49.
98.
34.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
NEW YORK
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
„,.„,,. „ 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 873
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
36300.
33622.
24533520.
2292765.
5408521.
MINIMUM
3.
0.
1721.
20.
238.
AVERAGE
681.
352.
335925.
23315.
65980.
TOTAL
59H332.
307101.
293262592.
20353984.
57600560.
S.D.
2088.
2028.
1528021.
125217.
316761.
OEM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
20353984.
14663128.
22581200.
TOTAL
57598304.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
^j COST RANGE
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CO
CO
500000.
100000.
50000.
10000.
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
2292765.
434288.
98331.
48677.
9966.
MAXIMUM
30666896.
4435552.
960954.
496718.
99968.
MINIMUM
560409.
100382.
50052.
10092.
20.
AVERAGE
1641499.
186662.
70276.
21144.
4538.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5027460.
1004459.
510207.
100448.
2152.
AVERAGE
17981088.
1778051.
710134.
204745.
63362.
TOTAL
6565996.
4479886.
2108290.
4461291.
2740741.
TOTAL
125867648.
80012336.
51839792.
89064192.
19832432.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *it* *5* *6* *7* *8* *9*
*10*
MAX
KIN
AVE
TOT
SD
15385.
0.
593.
33225.
2874.
996.
0.
18.
10202.
73.
3802.
0.
107.
57016.
255.
7529.
0.
63.
37782.
387.
126.
5.
22.
1943.
18.
3087
0
182
69255
310
S.D.
829877.
89315.
14910.
9372.
2419.
S.D.
11810694.
834889.
132749.
100585.
23717.
NUMBER
4.
24.
30.
211.
604.
NUMBER
7.
45.
73.
435.
313.
*11*
*12*
49.
0.
42.
83.
10.
4557.
5.
127.
63673.
286.
19:
0.
2.
598.
2.
8653.
0.
8653.
8653.
0.
8508.
0.
8508.
8508.
0.
1669.
0.
1174.
2348.
700.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*H* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
494.
0.
24.
1346.
92.
23.
0.
1.
455.
1.
1445.
0.
14.
7275.
90.
270.
0.
4.
2595.
19.
115.
1.
7.
661.
14.
388
0
14
5164
38
3.
0.
2.
4.
1.
147.
0.
4.
1920.
10.
5.
0.
0.
117.
1.
*10*
12.
0.
12.
12.
0.
725.
0.
725.
725.
0.
*12*
55.
0.
40.
81.
21.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
1968
475
NORTH
Ftnw AT OBSERVED 1963 LEVEL
FLOW CONOITICNS ( 1967 DOLLARS)
MANUFACTURING EMPLOVMFNT
FLOW (MOV)
TOTAL OPITAL cnsr
TOTAL ANNUAL C6M CC^T
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO ICCOCO.
10000. TO 50000.
c. TO looor.
tD COST RANGE
5000000.
1000000. TO 500000C.
5000CO. TO ICCOOOO.
100000. TO 5COOOO.
0. TT 100000.
MAX
MIN
4V F
TOT
SO
*l*
66.
0.
21 .
?1? .
27.
376 .
I .
12.
3449 .
26 .
M !\ X I M t M
7200.
342^0.
I35P8S21.
7<1 1C2.
2443128.
OEM
7471763.
DISTR
PA xi >"JP
721152.
209223.
79143.
49492.
9R91 .
MINIMUM
15.
8.
22P61.
1115.
4595.
ANNUAL COST OF hAST
RFPLftCEMENT
7033573.
IBUTION OF OPERATICN
MINIMUM
521322.
103444.
52961.
1C065.
U15.
&VER4GE
490.
412.
296150.
15730.
5334C.
E TREATMENT
INTEREST
10831696.
AND MAINTENANCE CCST
4VER1GF
653270.
143737.
64211 .
20897.
5157.
TOTAL
232689.
195476.
140671472.
7471763.
25336400.
TOTAL
25337024
TOTAL
1959810.
718684.
642106.
2382257.
1768965.
DISTRIBUTION OF INVESTMENT RETIREMENTS
(•AX IMJW
16936144.
2442056.
975229.
494314.
99633.
DISTRIBUTION
*3* *4*
713. 3P64.
0 . 0.
7f. 4B.
19983. 16916.
90. 274.
M IN HUM
5669775 .
1C07640.
504275.
110633.
26577.
AVERAGE
101S9060.
1456872.
668471 .
21 1091 .
7854K.
TOTAL
40756240.
3642 1808.
19385648.
74092912.
5184185 .
OF TOTll. CAPITAL CCST FCR TREATMENT ($ 1000)
*5* *6*
47. 29C2.
7. 0.
21. 158.
861. 49663.
8. 268.
*7* *8*
36. 2819.
0 . 12.
33. 110.
9". 43310.
3. 244.
*9* *IC*
18. 0.
1. 0.
4. 0.
267. 0.
3. 0.
S.D.
655.
2181.
83226<9.
54600.
158801.
S.D.
1 14290.
41029.
9838.
10145.
2146.
S.D.
4955C70.
403214.
129727.
S8538.
171 16.
NUMBER
3.
5.
10.
114.
343.
NUMBER
4.
25.
29.
351.
66.
5083 .
0.
5C63.
5083.
0.
*12*
621.
0.
621.
621.
0.
MAX
MIN
AVE
TOT
SD
*1*
14.
0.
4.
*2*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS
-------
NORTH CAROLINA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
_,-„„ 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 475
O
a
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
66.
0.
28.
198.
22.
*2*
376.
1.
11.
3118.
26.
MAXIMUM
7200.
21559.
8542861.
H85575.
1532655.
OSM
6090818.
MINIMUM
15.
8.
22861.
1013.
4203.
ANNUAL COST OF WASTE
REPLACEMENT
6039040.
DISTRIBUTION OF OPERATION
MAXIMUM
0.
485575.
95640.
46566.
9899.
MINIMUM
0.
154524.
51132.
10092.
1013.
AVERAGE
490.
308.
254275.
12823.
45115.
TREATMENT
INTEREST
9300118.
AND MAINTENANCE COST
AVERAGE
0.
342575.
64670.
20965.
4905.
TOTAL
232689.
146063.
120780816.
6090818.
21429584.
TOTAL
21429968
TOTAL
0.
1712877.
452690.
2159408.
1765896.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
10678576.
1958110.
938846.
489309.
99557.
DISTRIBUTION
*3* *4*
713. 20U6.
0. 0.
68. 34.
18218. 12134.
84. 168.
MINIMUM
5669775.
1005977.
528737.
100888.
28577.
AVERAGE
7533560.
1318693.
686429.
208388.
75932.
TOTAL
30134240.
25055168.
19220016.
69810144.
6757992.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
43. 2114.
7. 0.
19. 141.
786. 44423.
7. 217.
*7* *8*
36. 1970.
0. 12.
33. 96.
98. 37604.
3. 185.
*9* *10*
16. 0.
1. 0.
3. 0.
225. 0.
2. 0.
S.D.
655.
1427.
592046.
38298.
112276.
S.D.
0.
150015.
16062.
9950.
2157.
S.D.
2182889.
314089.
129329.
90427.
17296.
NUMBER
0.
5.
7.
103.
360.
NUMBER
4.
19.
28.
335.
89.
*11*
3356.
0.
3356.
3356.
0.
*12*
621.
0.
621.
621.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS ($ 1000)
*«* #5* *6* *7* *8* *9*
14.
0.
5.
32.
5.
4.
0.
0.
135.
0.
124.
0.
4.
1175.
10.
76.
0.
2.
670.
7.
19.
1.
5.
198.
4.
329.
0.
8.
2616.
26.
2.
0.
1.
4.
0.
79.
0.
2.
952.
6.
4.
0.
0.
35.
0.
*10*
0.
0.
0.
0.
0.
*11*
257.
0.
257.
257.
0.
*12*
19.
0.
19.
19.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
NORTH CAROLINA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 175
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
7200.
16190.
6975499.
380689.
1249999.
MINIMUM
15.
7.
13936.
716.
3055.
AVERAGE
490.
231.
211521.
10134.
36997.
TOTAL
232689.
109717.
100472288.
4813529.
17573360.
S.D.
655.
1067.
475993.
30054.
89651.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
4813529.
5023614.
7736362.
TOTAL
17573504.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
to
O
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
0.
380689.
56063.
48151,
9975.
MAXIMUM
8719373.
4248167.
965386.
497712.
99930.
MINIMUM
0.
128177.
55731.
10012.
716.
AVERAGE
0.
269255.
55897.
19241.
4414.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5454358. 6667141.
1051927. 1505710.
519052, 699912.
100481. 201621.
17421. 72184.
TOTAL
0.
1346274.
111794.
1673952.
1681566.
TOTAL
20001424.
15057108.
19597536.
61696080.
9239555.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
47.
0.
20.
139.
16.
275.
1.
8.
2389.
18.
626.
0.
56.
15030.
67.
1543.
0.
25.
8855.
125.
36.
6.
15.
649.
6.
1804.
0.
122.
38276.
182.
32.
0.
30.
89.
2.
1639.
/ .
81.
31608.
151.
12.
0.
2.
180.
2.
*10*
0.
0.
0.
0.
0.
S.D.
0.
121957.
231.
9254.
2117.
S.D.
1787070.
979074.
159490.
89090.
18183.
NUMBER
0.
5.
2.
87.
381.
NUMBER
3.
10.
28.
306.
128.
*11*
2791.
0.
2791.
2791.
0.
*12*
467.
0.
467.
467.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*14* *5* *6* *7* *8* *9*
10.
0.
3.
22.
4.
3.
0.
0.
121.
0.
103.
0.
3.
876.
8.
61.
0.
1,
506.
5.
14.
1.
3.
139.
3.
260
0
7
2092
21
1.
0.
1.
3.
0.
61.
0.
2.
799.
4.
3.
0.
0.
26.
0.
*10*
0.
0.
0.
0.
0.
*11*
215.
0.
215.
215.
0.
*12*
14.
0.
14.
14.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED,
-------
TOTAL NIIMPFR OF MANUFACTURING PLANTS,
NORTH DAKOTA
FLOW 4T OBSERVEC 1968 LEVEL
1968 FLPW CONDITICNS ( 1967 DCLLARS)
20
MANUFACTURING EMPLQYfFNT
Fl PW <"GY )
TOTAL CAPITAL COST
Tt>T!\L iK'NUAL PCM COST
TOTAL Al"MJAl COST
MAX IMIIM
533.
1 175.
3072230.
153653.
•^43826.
I MUM
Ifc.
14.
33663.
1479.
AVERAGE
21 6.
466177.
2401 5.
83219.
TOTAL
?286.
4316.
9323537.
48C30C.
1664387.
S.D.
117.
323.
811816.
40654.
143717.
OEM
ANNUAL COST IF ViASTE TREATMENT
REPLACEMENT INTEREST
4PC300.
466177.
717912.
TOTAL
1664388.
OISTRIBLTICN OF -iPERSTICI1- ANC I" AINTEN ANCE CCST
o
to
COST RANCF
> 5CCCTC.
inpooo . TO
C0000. TO
10^00. TO
r> . TO
r.TST RANGF
> 5^00000.
1 OOOOOC. TO
50PPOO. TO
nonce. TO
0. TO
500000
100000
c.cocc
loono
cccocoo
1000000
5LOOOO
1COOOO
MAX
o.
1^3653.
96602.
1 5480.
i N n LJM
o.
153653.
58733.
10434.
1479.
AVERAGE
0.
153653.
76802.
12951.
3703 .
MAXIMUM
0.
3P4C287.
0.
425151.
DISTRIBUTION OF INVESTMENT RECUIREMENTS
AVERAGE
0.
2374984.
0.
226773.
63008.
0.
1470487.
0.
126,786 .
42329.
TOTAL
0.
153653.
230406.
51803.
44438.
TOTAL
0.
9499937.
0.
15874C9.
567C75.
DTSTRlniJTICN OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
MAX
MIN
AVE
THT
SO
*1*
3?7.
0 .
145.
5fl 1 .
137.
*2*
143.
? .
2P .
?82.
42 .
*3*
328.
0.
P4 .
1183.
?4.
*4*
?57.
0.
45.
40^.
1.
* s*
23.
7.
16.
47.
8.
*e*
689.
C.
274.
1098 .
2f 1.
*7*
u.
0.
0.
0.
0.
*8*
339.
14 ,
72.
1011 .
89.
6.
1 .
4.
11.
3.
*10*
C.
0.
0.
0.
0.
s.o.
0.
0.
18994.
2063.
2363.
S.D.
0.
1051154.
0.
115875.
2C6S4.
NUMBER
0.
1.
3.
4.
12.
NUMBER
0.
4.
0.
7.
9.
*ll*
0.
0.
0.
0.
0.
*12*
2325.
0.
1568.
4705.
715.
"AX
M IN
4VF
TOT
SO
*[*
37.
C.
*3*
01 STRIBUTI CN Of- ANNUAL CGf TPE/lTVEfa CCSTS (t 1000)
*4* *5* *6* *7* *8* *?*
3 .
P.
1 .
o .
1 .
?° .
0.
6.
8=1 .
q.
13.
0.
3.
26.
4.
7.
1.
4.
12.
3.
?3 .
C .
18 .
73.
23.
0.
0.
0.
0.
0 .
7.
I.
2 .
28.
2 .
I .
0.
I .
2.
1.
*10*
0.
0.
0.
0.
C.
*11*
0.
0.
0.
o-.
0.
*12*
81.
0.
55.
166.
25.
SO
UR S.n. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
NORTH DAKOTA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 20
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
530.
848.
235871«.
118398.
417955.
MINIMUM
18.
10.
26926.
1166.
i»585.
AVERAGE
114.
160.
369417.
18888.
65803.
TOTAL
2286.
3197.
7388331.
377752.
1316068.
S.D.
117.
232.
625117.
31182.
110533.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
377752.
369417.
568901.
TOTAL
1316069.
to
o
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
0.
118398.
74510.
45354.
9393.
MAXIMUM
0.
2948392.
0.
377110.
80179.
MINIMUM
0.
118398.
57474.
12812.
1166.
AVERAGE
0.
118398.
65992.
23812.
3995.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1142232.
0.
102761.
33658.
AVERAGE
0.
1845448.
0.
196207.
53352.
TOTAL
0.
118398.
131983.
71436.
55935.
TOTAL
0.
7381795.
0.
1373447.
480172.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *u* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
220.
0.
10C.
401.
91.
112.
2.
22.
222.
33.
268.
0.
72.
1015.
78.
186
0
34
304
58
19.
7.
13.
40.
6.
574.
0.
233.
933.
233.
0.
0.
0.
0.
0.
274.
11.
58.
819.
72.
5.
1.
3.
9.
2.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
S.D.
0.
0.
12046.
18657.
2980.
S.D.
0.
791933.
0.
102783.
19319.
NUMBER
0.
1.
2.
3.
14.
NUMBER
0.
4.
0.
7.
9.
*12*
1802.
0.
1215.
3646.
554.
MAX
MIN
AVE
TOT
SD
*1*
28.
0.
14.
57.
12.
*2*
2.
0.
1.
8.
1.
*3*
22.
0.
5.
7t.
7.
DISTRIBUTION OF ANNUAL O5M TREATMENT COSTS ($ 1000)
*U* *5* *6* *7* *8* *9*
9.
0.
2.
21.
3.
5.
1.
3.
9.
2.
40.
0.
14.
57.
17.
0.
0.
0.
0.
a.
6.
1.
2.
24.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
64.
0.
43.
130.
19.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
NORTH DAKOTA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS,.. 20
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
530.
590.
1763266.
88510.
312445.
MINIMUM
18.
8.
23195.
1005.
3951.
AVERAGE
114.
116.
288005.
14582.
51159.
TOTAL
2286.
2326.
5760095.
291639.
1023171.
S.D.
117.
160.
467220.
23112.
82400.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
291639.
288005.
443527.
TOTAL
1023170.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CO
o
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
0.
0.
88510.
42126.
8494.
MAXIMUM
0.
2204082.
863271.
316650.
95993.
MINIMUM
0.
0.
55765.
10609.
1005.
AVERAGE
0.
0.
72137.
24623.
3491.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1118028.
863271.
126786.
28993.
AVERAGE
0.
1573251.
863271.
199733.
56221.
TOTAL
0.
0.
144275.
98493.
48871.
TOTAL
0.
4719755.
863271.
998663.
618434.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *l»* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
145.
0.
68.
. 273.
59.
84.
2.
17.
172.
25.
214.
0.
62.
869.
62.
128.
0.
24.
219.
40.
17.
7.
12.
36.
5.
466
0
193
773
187
0,
0.
0.
0.
0.
215.
9.
48.
672.
57.
4.
1.
2.
7.
1.
*10*
0.
0.
0.
0.
0.
S.D.
0.
0.
23154.
16065.
2595.
S.D.
0.
563921.
0.
79934.
25103.
NUMBER
0.
0.
2.
4.
14.
NUMBER
0.
3.
1.
5.
11.
*11*
0.
0.
0.
0.
0.
*12*
1354.
0.
913.
2740.
416.
MAX
MIN
AVF,
TOT
SD
*1*
21.
0.
11.
43.
9.
*2*
2.
0.
1.
7.
0.
*3*
16.
0.
4.
57.
5.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS (§ 1COO)
*6* *7* *8* *9*
7.
0.
2.
16.
2.
4.
1.
2.
7.
1.
29.
0.
11.
43.
13.
0.
0.
0.
0.
0.
5.
1.
1.
20.
1.
*10*
0.
0,
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
48.
0.
33.
98.
15.
SD OR S.D. REPRESENTS STANDARD DEVIATION, THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL Nt/MPFP OF MANUFACTURING PLANTS..,
CHIO
FlOW AT nnSERVEC Ic-t8 LEVEL
1963 FlfM CONDITIONS ( 1967 COLLARS)
IC74
"ANUFACTURINC
FLOW (MOV)
TPTM ^PIT&L COST
TOTAL ANM'AL C£M CCST
TOTAL ANNUAL CflST
COST RANGE
> 5000^0.
irooo'i. TP
50000. TO
loooo. TT
o. TP
5TOOOO.
1COOOO.
50000.
10000.
CO
o
en
COST P4NGF
> 50000.10.
1 00oron . TO
5CCCOO. in
ICOOOn. Tr
0. TC1
500^000.
irocooo.
5COOOC.
ICOOOC.
MAX
M IN
4VF
TOT
sn
15 TRFATMtNT CrSTS (t 1000)
*4$ $c.* ^ £-:- ^7* * 8* #9*
30?
6139.
343.
] .
1 I .
871.
261 .
C.
11 .
42 37.
22.
"10*
16.
0.
/,.
2 '7 .
5.
67.
1 .
4.
1865 .
7.
30.
0.
1.
464.
2.
1?.
0.
1 3.
13.
0.
*u*
0.
c.
0.
0.
0 .
*12*
90.
0.
53.
479.
28.
SO PR S.O. REPPESFNTS STANOAPI. DCVIATrnN. THE DATA DISTRIBLIICN LSfC IS HIGHIY SKEwEO.
-------
OHIO
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1074
CO
o
SD
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
20000.
29431.
21976576.
2434750.
5225774.
O6M
38695056.
MINIMUM
11.
2.
10060.
636.
1914.
ANNUAL COST OF WASTE
REPLACEMENT
18034416.
AVERAGE
812.
397.
335836.
36029.
78686.
TREATMENT
INTEREST
27772976.
TOTAL
872371.
426018.
360688384.
38695056.
84508480.
TOTAL
84502448
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
MAXIMUM
2434750.
391854.
99501.
49773.
9972.
MINIMUM
592395.
100360.
50475.
10002.
636.
AVERAGE
1296732.
187561.
68722.
20696.
5223.
TOTAL
14264062.
10690985.
3092511.
7533364.
3117881.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1* *2*
X 13566. 917.
N 0. 1.
E 602. 24.
T 60802. 19251. 1
1987. 70.
MAXIMUM
27470720.
4593561.
992870.
495560.
99509.
DISTRIBUTION
*3* *4*
3516. 2941.
0. 0.
143. 52.
18959. 44592.
287. 199.
MINIMUM
5437341.
1008279.
510433.
100157.
12575.
OF TOTAL CAPITAL COST
*5* *6*
144. 1531.
5. 0.
19. 130.
1524. 49320.
19. 165.
AVERAGE
13628254.
1842534.
689738.
201510.
65504.
FOR TREATMENT ($
*7* *8*
81. 1325.
0. 6.
41. 100.
287. 45955.
19. 155.
TOTAL
136282544.
127134848.
46212416.
119294000.
22009392.
1000)
-*9* *10*
30. 7323.
0. 0.
3. 7323.
1091. 7323.
3. 0.
S.D.
1726.
1794.
1207661.
148627.
299504.
S.D.
618170.
78256.
13898.
10217.
2449.
S.D.
6911211.
848604.
137762.
95550.
21459.
NUMBER
11.
57.
45.
364.
597.
NUMBER
10.
69.
67.
592.
336.
*11*
0.
0.
0.
0.
0.
*12*
2236.
0.
1292.
11631.
691.
+ 1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*tt* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
526.
0.
46.
4673.
97.
25.
0.
1.
935.
2.
1533.
0.
25.
20879.
104.
287.
0.
6.
4954.
20.
313.
1.
11.
847.
36.
261
0
10
3801
21
15.
0.
4.
27.
5.
64.
1.
4.
1785.
7.
18.
0.
1.
301.
1.
*10*
13.
0.
13.
13.
0.
*11*
0.
0.
0.
0.
0.
*12*
90.
0.
53.
479.
28.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
OHIO
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1074
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
7354.
0.
350.
35373.
1091.
*2*
700.
0.
19.
15209.
54.
MAXIMUM
20000.
20497.
13719141.
1769103.
3511433.
O6M-
30107312.
MINIMUM
11.
1.
8101.
530.
1559.
ANNUAL COST OF WASTE
REPLACEMENT
14451378.
DISTRIBUTION OF OPERATION
MAXIMUM
1769103.
432316.
99175.
49924.
9971.
MINIMUM
515801.
100740.
50084.
10027.
530.
AVERAGE
812.
299.
269113.
28033.
62212.
TREATMENT
INTEREST
22255104.
AND MAINTENANCE COST
AVERAGE
1057045.
178912.
72134.
20438.
4874.
TOTAL
872371.
321192.
289027584.
30107312.
66815616.
TOTAL
66813792
TOTAL
9513406.
8229935.
2813207.
6274466.
3279950.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
17148912.
4777005.
991339.
491542.
99483.
DISTRIBUTION
*3* *l(*
2784. 2059.
0. 0.
119. 39.
98516. 33398.
230. 143.
MINIMUM
6432832.
1004449.
503251.
100066.
10127.
AVERAGE
10293268.
1802140.
691340.
192899.
63689.
TOTAL
82346144.
108128400.
42171760.
102236320.
26430784.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
118. 1531.
5. 0.
18. 120.
1443. 45335.
17. 156.
*7* *8*
73. 1325.
0. 6.
39. 89.
276. 41173.
17. 137.
*9* *10*
25. 5878.
0. 0.
2. 5878.
878. 5878.
2. 0.
S.D.
1726.
1276.
818147.
108979.
210491.
s.c.
414777.
80625.
15626.
9912.
2340.
S.D.
3695019.
916047.
137U16.
91707.
20804.
NUMBER
9.
46.
39.
307.
673.
NUMBER
8.
60.
61.
530.
415.
*11*
0.
0.
0.
0.
0.
*12*
2236.
0.
1285.
11564.
685.
*1*
*2*
*3*
DISTRIBUTION OP ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
391.
0.
35.
3542.
72.
19.
0.
1.
809.
1.
1105.
0.
19.
15613.
76.
207.
0.
4.
3766.
14.
218.
1.
9.
712.
26.
261
0
9
3370
20
*10*
11.
0.
3.
23.
4.
59.
1.
3.
1567.
6.
14.
0.
1.
222.
1.
11.
0.
11.
1 1.
0.
*11*
0.
0.
0.
0.
0.
*12*
90.
0.
53.
476.
28.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
. TAL NUMBER OF MANUFACTURING PL!\NTS..
H68
119
CKL 9t-CV 8
FLOW AT OBSERVED 1968 LEVEL
FLDW CONDITIONS ( 1=67 DOLLARS)
FLCW
TCTAL
TI'TAL
TPTAL
EMPLOYMENT
CAPITAL COST
ANMIAI OEM COST
ANNtAl CCST
1 MUM
5110.
1765.
4U51073.
•?7l5qs.
736075.
M I N I MUM
1 5.
3.
12695.
767.
2375.
AVER4GE
370
137
189223
13754
37785
TOTAL
43986.
16297.
22517488.
1636677.
4496448.
S.D.
710.
264.
403259.
26754.
76285.
OEM
1636677.
ANNUAL COST OF lnASTE TREATMENT
REPLACEMENT INTEREST
1125674.
1733845.
TOTAL
4496396.
DISTRIBUTION OF '1PERATICN AND MAINTENANCE CCST
CO
o
CO
rrsT R
> ^00
100000
^OOOC
1 0000
0
A \'G F
t » w ' , •
. TT 500000.
. TO ICCfOO.
. TO ^0000.
. TO 10000.
COST PANIC f
1 000000
500000
100000
0
M AX
MIN
A VF
Tf)T
sn
MA v
M IN!
AVF
TOT
sn
. TP 5000000.
. TT 1000000.
. TH cccocr.
. TO 1C 00 PC.
S?l. Hi
f . 1
67. 10
!00 3 . 717
131. 14
* | * * ? *
*./.. 3
C. 0
10 . 1
151. 46
1 r> O
.
.
.
.
t
.
.
.
m
MAX f ^' \ M
C.
271599.
'35R55 .
4 « 7 C I .
-------
OKLAHOMA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 PLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 119
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
5110.
1765.
14051073.
221589.
736075.
MINIMUM
15.
3.
12695.
767.
2379.
AVERAGE
370.
117.
179618.
12005.
35216.
TOTAL
43986.
13978.
21374528.
1476138.
4190745.
S.D.
710.
224.
398026.
24853.
714248.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1476138.
1068726.
1645837.
TOTAL
4190701.
to
o
<£>
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
0.
221589.
58402.
45201.
8936.
MAXIMUM
5063841.
1201662.
962079.
475213.
99243.
MINIMUM
0.
125229.
51963.
10854.
767.
AVERAGE
0.
173409.
54426.
20415.
4015.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5063841. 5063841.
1030590. 1102304.
500739. 740661.
103257. 200333.
15868. 63444.
TOTAL
0.
346818.
163278.
632850.
333212.
TOTAL
5063841.
3306914.
3703304.
11218630.
3425975.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *a* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
521.
0.
66.
984.
130.
76.
1.
9.
647.
12.
417.
0.
78.
6366.
78.
114.
0.
12.
1025.
19.
37.
4.
12.
136.
9.
261
0
66
2840
46
0.
0.
0.
0.
0.
293.
10.
49.
2649.
47.
13.
0.
2.
63.
2,
*10*
0.
0.
0.
0.
0.
S.D.
0.
68136.
3477.
9930.
1876.
S.D.
0.
88820.
165332.
101041.
22588.
NUMBER
0.
2.
3.
31.
83.
NUMBER
1.
3.
5.
56.
54.
*11*
0.
0.
0.
0.
0.
*12*
3010.
0.
667.
6665.
848.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OgM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
54.
0.
10.
148.
15.
3.
0.
1.
44.
0.
73.
0.
7.
614.
12.
14.
0.
2.
128.
2.
20.
0.
4.
40.
5.
12
0
3
132
3
0.
0.
0.
0.
0.
9.
1.
2.
92.
1.
4.
0.
0.
14.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
116.
0.
26.
263.
32.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
OKLAHOMA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 119
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
5110.
1765.
4051073.
221589.
736075.
MINIMUM
15.
3.
12695.
767.
2379.
AVERAGE
370.
95.
164600.
10676.
31580.
TOTAL
13986.
11268.
19587424.
1270387.
3758015.
S.D.
710.
193.
3914138.
23066.
72507.
O&M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1270387.
979371.
1508230.
TOTAL
3757988.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*2*
MAXIMUM
0.
221589.
91902.
145201.
9585.
MAXIMUM
5063841.
1201662.
962079.
435457.
99243.
MINIMUM
0.
221589.
52913.
10854.
767.
AVERAGE
0.
221589.
72408.
21083.
3954.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5063841. 5063841.
1030590. 1116126.
543149. 758762.
104717. 196047.
15868. 63246.
TOTAL
0.
221589.
144815.
548159.
355838.
TOTAL
5063841.
2232252.
3793811.
9410246.
3984501.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
521.
0.
63.
940.
129.
58.
1.
8.
562.
10.
397.
0.
67.
5491.
65.
80.
0.
10.
793.
14.
35.
4.
11.
126.
9.
191
0
60
2585
40
0.
0.
0,
0.
0.
268.
10.
44.
2367.
42.
12.
0.
2.
58.
2.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
S.D.
0.
0.
27570.
10321.
2034.
S.D.
0.
120966.
153661.
95714.
22371.
NUMBER
0.
1.
2.
26.
90.
NUMBER
1.
2.
5.
48.
63.
*12*
3010.
0.
667.
6665.
848.
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
54.
0.
9.
139.
14.
2.
0.
1.
41 .
0.
53.
0.
6.
479.
9.
10.
0.
1.
101.
2.
18.
0.
3.
36.
5.
10
0
3
115
2
0.
0.
0.
0.
0.
8.
1.
2.
84.
1.
3.
0.
0.
12.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
116.
0.
26.
263.
32.
SD OR S.D.
REPRESENTS STANDARD DEVIA'
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL MJPBER CF M/INUF ACTUR IN C PI ANTS . . .
1968
20 L
OREGON
FLOW »T f.lBSERVtC 1966 LEVEL
FLOW CONDITIONS I 1967 DOLLARS)
MANUFACTURING EMPLOYMENT
ROW (MGYI
TOTAL CAPITAL COST
TOTAL ANNUAL 06* COST
TOTAL ANNUAl COST
MAXIMUM
•5900.
1665790.
46S4517.
MINIMUM
15.
6.
23372.
1434.
AVERAGE
1073.
860594.
57347.
166641.
TOTAL
65832.
215577.
172979488.
11526662.
33494784.
S.O.
495.
3559.
2361881.
166847.
465226.
OGM
ANNUAL COST OF kASIE TREATMENT
REPLACEMENT INTEREST
I 152666?.
8648973.
13319414.
TOTAL
33495Q40.
COST RANGE
> 50QCCC.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF UPER4TICN 4ND MflINTEN4NCt COST
=ccoco.
100000.
50000.
looon.
COST R.\NGE
> 5000000.
1000000. TO 5COOOOC.
•5COPOO. TO 1000000.
100000. TC 5COOOO.
0. TO 100000.
*2*
MAXIMUM
1665790.
373548.
973C5.
49874.
S5C6.
MINI M UM
779235.
103713.
52723.
10046.
1434.
AVERAGE
1278798.
212560 .
70232.
26667.
5628.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
2"81C320.
4959S88.
9760 15.
493401.
99104.
MINIMUM
7762902,
1041225.
508154.
10 1583.
29216,
AVERAGE
19147360.
1887572.
705082 .
236504.
72991 .
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ LOGO)
TOTAL
3836395.
2763277.
L685563.
2960C40.
281416.
TOTAL
76589488.
67952592.
54996432.
15372728.
1313832.
S.D.
453872.
95061.
15207.
9714.
2153.
S.D.
10042812.
987385.
123560.
108218.
1S818.
NUMBER
3.
13.
24.
111.
50.
NUMBER
4.
36.
78.
65.
18.
*5*
*6*
*7*
MAX
MIN
AVF
TOT
SD
76.
0.
31,
157.
33.
255.
1.
28 .
2171.
45.
1052.
0.
If 1 .
79C5.
2C7.
7760.
0.
216.
3C709.
855.
53.
6.
19.
227.
12.
3054
0
372
55757
4C2
*8*
*9*
*10*
*u*
*12*
0.
0.
0.
0.
0.
4546.
18 .
303.
49758 .
516 .
e.
o .
3.
65.
2.
5228.
0.
5228.
5228.
0.
8489.
0.
6711 .
20134.
2112.
868.
0.
868.
868.
0.
MAX
MIN
4VE
TCT
SD
* I*
*2*
*3*
DISTRIBUTION OF ANNUAL C6M TRE/TPftvT CCSTS (* 1000 »
*5* *6* *7* *8* *9*
14.
0.
5.
25.
f,.
f, ,
0 .
1.
87 .
1.
243.
0.
23.
1108.
45.
251.
0.
12.
1674.
29.
24.
1 .
6.
(7.
6.
3^8
0
33
4<522
54
0.
0.
0.
0.
1 76.
1.
10 .
1582.
19.
2.
0.
1.
13 .
1.
*10*
9.
0.
S.
9.
C.
*11*
841 .
0.
668.
2005.
206.
*12*
34.
0.
34.
34.
0.
SO OP S.n. REPRESENTS STANDARC CEVIATION. THE DATA DISTRIBUTION USfcO IS HIGHLY SKEWED.
-------
OREGON
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS { 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 201
MANUFACTURING EMPLOYMENT
FLOW 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000,
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
889750. 746401. 818075.
423465. 113613. 194724.
94447. 50137. 73271.
48079. 10090. 18447.
9968. 1189. 6055.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE
16038596. 7745056. 12425594.
3944678. 1039375. 1905781.
929702. 500594. 663462.
487852. 101556. 277649.
97946. 24707. 69796.
TOTAL
1636150.
1363065.
659442.
1734063.
538931.
TOTAL
37276784.
26680944.
19903856.
34706160.
2024082.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
76.
0.
29.
145.
31.
196.
1.
20.
1562.
31.
701.
0.
116.
5696.
142.
3365.
0.
90.
12740.
372.
47.
6.
16.
193.
11.
1910
0
222
33328
255
0.
0.
0.
0.
0.
2636.
13.
169.
27652.
300.
*10*
S.D.
101371.
106102.
18501.
8615.
2725.
S.D.
4248561.
814402.
124877.
109304.
20744.
NUMBER
2.
7.
9.
94.
89.
NUMBER
3.
14.
30.
125.
29.
*11*
*12*
6.
0.
2.
52.
2.
2568.
0.
2568.
2568.
0.
4920.
0.
3890.
11670.
1224.
868.
0.
868.
868.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*U* *5* *6* *7* *8* *9*
14.
0.
5.
24.
6.
4.
0.
1.
72.
1.
137.
0.
14.
673.
26.
117.
0.
5.
742.
14.
19.
1.
4. *
' 50.
5.
198
0
16
2326
27
0.
0.
0.
0.
0.
81.
1.
5.
818.
9.
2.
0.
0.
10.
0.
*10*
5.
0.
5.
5.
0.
*11*
494.
0.
393.
1178.
121.
*12*
34.
0.
34.
34.
0.
SD OR S.D. REPRESENTS, STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
OREGON
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS < 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 201
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
5900.
11893.
10451767.
722286.
2049659.
MINIMUM
15.
4.
17061.
1014.
3181.
AVERAGE
328.
356.
m7203.
24601.
77586.
TOTAL
65832.
71550.
83857808.
4944770.
15594813.
S.D.
495.
1150.
1043777.
72371.
204391.
O£M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
4944770.
4192890.
6457048.
TOTAL ,
15594708.
to
t-i
CO
COST RANGE
> 500000.
100000. TO
500000.
50000. TO 100000.
10000. TO 50000.
0. TO
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
722286. 606718. 664502.
345590. 102812. 165671.
83606. 60890. 73359.
48079. 10076. 18295.
9968. 1014. 5647.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE
13064708. 6352575. 10142501.
3205071. 1039375. 1731709.
990183. 500791. 669455.
490069. 104170. 285553.
97727. 21327. 68995.
TOTAL
1329003.
994026.
440155.
1628234.
553390.
TOTAL
30427504.
20780512.
16736381.
33980768.
2897796.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *i»* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
76.
0.
24.
121 .
30.
148.
1.
16.
1222.
25.
587.
0.
91.
4476.
113.
2537.
0.
71.
10092.
280.
31.
6.
13.
161.
7.
1630
0
203
30453
217
*10*
S.D.
81723.
91006.
7753.
8934.
2797.
S.D.
3439177.
601175.
135506.
106141.
21803.
NUMBER
2.
6.
6.
89.
98.
NUMBER
3.
12.
25.
119.
42.
*11*
*12*
0.
0.
0.
0.
0.
2193.
11.
150.
24656.
249.
6.
0.
2.
42.
1.
2061.
0.
2061.
2061.
0.
4092.
0.
3235.
9706.
1018.
868.
0.
8t>8.
868.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O&M TREATMENT COSTS ($ 1000)
*U* *5* *6* *7* *8* *9*
14.
0.
4 .
20.
6.
3.
0.
1.
63.
1.
106.
0.
10.
474.
19.
90.
0.
4.
610.
11.
9.
1.
3.
34.
2.
156
0
13
1995
21
0.
0.
0.
0.
0.
63.
1.
4.
719.
7.
2.
0.
0.
7.
0.
*10*
4.
0.
4.
4.
0.
413.
0.
328.
984.
101.
*12*
34.
0.
34.
34.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTiL NUMBER OF MANUFACTURING PLANTS..,
PENNSYLVANIA
FLrIW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 COLLARS)
1C92
INS
TOT
sn
MANUFACTURING EMPLOYMENT
Fl DW ( MGY!
TDT \L C!*PITH COST
TPTAL ANNUAL CEM COST
TOTAl ANNUAL CCST
COST RANGE;
> 50^000.
IOOCOC. TC 5COOOO.
*oooo. TP iroooo.
100CO. TP 50000.
0. TO 10000.
MI xi MUM
28P>0.
39?42 .
?242 5C24.
2 ^74672.
H204226.
TCM
'+6576032.
DIST*
Ml XU'UM
2774672.
4 19545 .
'} 5 3 ? 2 .
495?1.
9--341 .
MINIMUM
1 5.
0.
2625.
253.
586.
ANNUAL COST OF WASTE
REPLACEMENT
28512816.
AVERAGE
674.
545.
522213.
42652.
108979.
TREATMENT
INTEREST
43909712.
TOTAL
735645.
595640.
570256384.
46576032.
119005232.
TOTAL
11 8998560
I3UT ION OF OPERATICN AND MAINTENANCE CCST
MINIMUM
504294.
IOC787.
50076 .
1C013.
253.
SVERUGE
U47662 .
238805.
71366 .
20°25.
4575.
TOTAL
21805584.
12179035.
2783274.
6800699.
3010511.
0 ISTRIBUTION OF INVESTMENT REQUIREMENTS
CPST RANGE
> 50CCCOO.
1 00000"). TP 500030C,
•500CCO. TO 1CCOOOC.
mcooo. TO 500000.
•1. TT 1 POO 00.
*[* *?*
X ?4744. 1137.
N 0. 0 .
E l?ff>. 31 .
T 143246 . 21141 . 1
3905. 91.
N/!X f MUM
£5531260.
4f-087c-7.
9953 35 .
4951C9.
99799.
DIS fRIBUTION
*?* *4*
4235. 3905.
0. 0.
174. 75.
3376*-. 59964.
379. ?67.
M INIMUM
5135580 .
1037946.
505355 .
1">0216.
3281.
OF TOTAL CAPITAL CCST
*5* *6*
58. 1757.
4. 0 .
18. 151.
1473. 68423.
12. 216.
AVERAGE
17674736.
2322985.
6969?8.
21 8868 .
61018.
FCR TREATMENT ( $ 1000
*7* *8*
29. 1543.
0. 5.
29. 122.
29. 71978.
0. 190.
TOTAL
335820C32.
174223904.
57148C96.
124535648.
2U73376.
* 9* * 1 C*
29. 2929.
0. 0.
3. 2475.
724. 4950.
2. 642.
s.o.
1584.
2357.
2561258.
176180.
485102.
S.O.
616813.
115691.
15276.
10304.
2536.
S.D.
17218720.
988438.
145878.
9S899.
22676.
NUMBER
19.
51.
39.
325.
658.
NUMBER
19.
75.
82.
569.
347.
*11*
0.
0.
0.
0.
0.
*12*
24158.
0.
5692.
62616.
8548.
MAX
MTN
AVF
TOT
SO
*1 *
589.
0.
7178.
107,
*3*
DISTRIPUTICN OF ANNUAL OEM TREATMENT COSTS ($ 10001
*4* #«;* *6* *7* *8* *9*
27.
0 .
t .
^ f •
/* •
1 7C8.
0.
31 .
23420.
123.
32H.
0.
7.
5361.
23.
30.
I.
5.
407.
6.
263
0
11
4852
27
1 .
0.
1.
1 .
0.
73.
0.
4.
2401 .
fi.
12.
0.
1.
149.
1 .
*10*
6.
0.
5.
9.
I.
*ll*
0.
0.
0.
0.
0.
724.
0.
177.
1945.
254.
SO OP S.n. RTPRFSf-NTS STANDART DEVIATION.
THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
PENNSYLVANIA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1092
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6K COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
|>Q COST RANGE
H-1- > 5000000.
CA 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
22476.
0.
1048.
118438.
3036.
*2*
1137.
0.
30.
22257.
90.
MAXIMUM
28600.
39242.
32999680.
2774672.
6965630.
O£M
44213104.
MINIMUM
15.
0.
2625.
253.
586.
ANNUAL COST OF WASTE
REPLACEMENT
25759520.
DISTRIBUTION OF OPERATION
MAXIMUM
2774672.
446479.
99293.
49334.
9908.
MINIMUM
504294.
100787.
50076.
10048.
253.
AVERAGE
674.
518.
471786.
40488.
100409.
TREATMENT
INTEREST
39669648.
AND MAINTENANCE COST
AVERAGE
1100434,
231931.
71862.
20462.
4567.
TOTAL
735645.
565796.
515190528.
44213104.
109646592.
TOTAL
109642272
TOTAL
20908256.
11596533.
2730748.
5770225.
3210317.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIf4UM
41249600.
4608797.
995335.
495109.
99799.
DISTRIBUTION
*3* *4*
4235. 3905.
0. 0.
165. 72.
126914. 57283.
370. 264.
MINIMUM
5185580.
1037946.
511165.
100387.
3281.
AVERAGE
14872549.
2269461.
705858.
211576.
61101.
TOTAL
232578432.
170209616.
51527616.
1 17001600.
22729552.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
58. 1757.
4. 0.
18. 147.
1464. 66758.
12. 216.
*7* *8*
29. 1543.
0. 5.
29. 120.
29. 71048.
0. 190.
*9* *10*
29. 2929.
0. 0.
2. 2475.
661. 4950.
2. 642.
S.D.
1584.
2288.
1989432.
169917.
412775.
S.D.
609546.
104803.
14685.
9805.
2501.
S.E.
11545225.
972852.
146778.
97999.
22368.
NUMBER
19.
50.
38.
282.
703.
NUMBER
19.
75.
73.
553.
372.
*11*
0.
0.
0.
0.
0.
*12*
16799.
0.
4129.
45423.
5847.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
589.
0.
61 .
6847.
102.
27.
0.
1.
826.
2.
1758.
0.
29.
22346.
122.
328.
0.
6.
5119.
23.
30.
1.
5.
403.
6.
263
0
10
4722
27
1.
0.
1.
1.
0.
73.
0.
4.
2374.
12.
0.
0.
130.
1 .
*10*
6.
0.
5.
9.
1 .
*11*
0.
0.
0.
0.
0.
*12*
509.
0.
131.
1436.
175.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
PENNSYLVANIA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS < 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1092
CO
K-*
O5
MAX
MIN
AVE
TOT
SD
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
28600.
27329.
20637008.
2014635.
4539849.
OSM
35315824.
MINIMUM
15.
0.
2625.
253.
586.
ANNUAL COST OF WASTE
REPLACEMENT
20561264.
DISTRIBUTION OF OPERATION
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
MAXIMUM
2014635.
463782.
99001.
49049.
9989.
MINIMUM
530480.
107054.
50076.
10107.
253.
AVERAGE
674.
404.
376580.
32340.
80170.
TREATMENT
INTEREST
31664320.
AND MAINTENANCE COST
AVERAGE
919923.
226505.
71527.
20446.
4395.
TOTAL
735645.
441332.
411225344.
35315824.
87545712.
TOTAL
87541408
TOTAL
13798852.
10419209.
2861083.
4947879.
3291770.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1* *2*
X 11942. 868.
ft 0. 0.
E 609. 25.
r 68818. 18563.
1644. 71.
MAXIMUM
25796256.
4542977.
977606.
495109.
99799.
DISTRIBUTION
+3* *4*
3351. 2734.
0. 0.
143. 56.
109452. 44970.
300. 192.
MINIMUM
5159936.
1037946.
511165.
100145.
3281.
AVERAGE
11187260.
2118488.
690008.
202528.
60667.
TOTAL
178996160,
156768112.
48300544.
104909536.
25115952.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
58. 1757.
4. 0.
17. 138.
1408. 62716.
12. 206.
*7* *8*
28. 1543.
0. 5.
28. 110.
28. 64802.
0. 172.
*9* *10*
21. 2351.
0. 0.
2. 2186.
579. 4372.
2. 233.
S.D.
1584.
1655.
1327521.
125795.
286945.
S.D.
431286.
93419.
14692.
10262.
2437.
NUMBER
15.
46.
40.
242.
749.
S.D. NUMBER
7269135. 16.
880265. 74.
143492. 70.
96195. 518.
22572. 414.
*11* *12*
0. 12627.
0. 0.
0. 3232.
0. 35554.
0. 4326.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
438.
0.
47.
5261.
76.
21.
0.
1.
734.
2.
1267.
0.
22.
17247.
89.
237.
0.
5.
4047.
17.
30.
1.
5.
380.
6.
263
0
9
4289
25
1.
0.
1.
1.
0.
60.
0.
4.
2103.
6.
8.
0.
0.
107.
1.
*10*
5.
0.
4.
8.
1.
*11*
0.
0.
0.
0.
0.
*12*
386.
0.
104.
1140.
130.
SD OR S.D. REPRESENTS STANDARD . DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUF&fTUR I UK PLANTS...
Fl 1W AT 1BSERVEC 1 ^COCCC.
looono. TP
TO
TO
0. Tn
50000C.
50000.
10000.
CO
H* CPST RANGE
*>! ^ 5000T^C.
loooo^. Tr 5Qconoo.
500<"i01. TT 1CCOOOC.
T( 5CCOOC.
Tn
MAX
MIN
AVF
TOT
SD
124,
0.
4 *:.
73.
0 .
MAXIMUM
3COC.
I.H47.
16C8640.
79213.
276 IS 1 .
ntM
1113833.
niSTR
MX 1 wjM
C.
o.
79113.
37215.
99%.
MINIMUM
10.
3.
8881.
669.
1947.
ANNUAL COST OF WASTE
REPL&OFMENT
°P7 IT:..
13UUON1 OF OPFRATICN
l« IN IMIIM
0 .
r<
7 1384 .
1 1100.
669.
AVERAGE
3F8.
11 8.
157948.
8903.
28962.
TREATMENT
1NTCPEST
1520^49.
A^L CAI.VTENANCE CCST
AVF.RAGb
-*t
0.
74874.
17756 .
4443.
01STO muTION OF INVESTMENT PECU IPEM ENTS
*/>X IVUM
0.
?P1 C6CO.
? S 4 3 3T .
463S87.
98171.
M 1 N I M t1''
,-\
< •
141 q9?c.
6">n5l l .
11263J.
11101.
AVERAGE
0.
1715295 .
722231.
232182.
60P18.
DISTRI3UTIC-M OF TGT U (SPIT1L CCST FOR TREATMENT (1 1000)
*£,* fcR* *fr" * 7* ^- M$
TOTHL
3620257.
TOTAL
0.
0.
224622.
461661.
426554.
TOTAL
0.
3430790.
3611406.
14961475.
267C;996 .
*10*
137.
0.
1?.
1 .
20.
14?.
21.
S.D.
514.
181.
1S8840.
12337.
36825.
S.O.
0.
0.
3921.
6935.
2586.
S.D.
0.
417766.
126847.
8931'..
26619.
NUMBER
0.
0.
3.
26.
96.
NUMBER
0.
2-
5.
74.
44.
*12*
57 '4.
74 ,
9 .
"!.
0 .
n .
'i .
469 .
4. '
59 .
4386 .
6-T.
7.
0.
2.
65.
1.
0.
0.
0.
0.
c.
0.
0.
c.
0.
0.
1237.
0.
1237.
1237.
0.
* 1 #
MAX
MIN
AVf
TOT
SC
2C.
0.
7 .
54.
?.
1. •
1 : •
1 .
46.
f .
4^ .
r.
4 .
i .
."[. 2 .
.). 12t<.
). 2 .
*ll*
*1Z*
2.
0.
,T
13.
0 .
C.
C.
0.
c.
0.
0.
c .
0.
0.
0.
39.
0.
39.
39.
0.
<;n
s.o.
TS ST\\r>4RD
THC
CISTRICUTICN US^C
HK.HIY SKEWEI>.
-------
RHODE ISLAND
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 125
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
3000.
1347.
1135992.
79313.
217696.
MINIMUM
10.
3.
8881.
669.
1947.
AVERAGE
388.
106.
U53514.
8131.
26591.
TOTAL
48494.
13296.
18169200.
1016105.
3323881.
S.D.
514.
173.
171148.
11349.
32386.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1016405.
908460.
1399027.
TOTAL
3323892.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CO
I-*
09
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
0.
0.
79313.
49718.
MINIMUM
0.
0.
73425.
11000.
669.
AVERAGE
0.
0.
76369.
17886.
1110.
MAXIMUM
0.
1419990.
884330.
463887.
98287.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
1399692. 1409841.
597284. 703676.
104040. 192035.
11101. 63738.
TOTAL
0.
0.
152738.
465034.
398633.
TOTAL
0.
2819682.
3518380.
13250427.
3123180.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *u* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
95.
0.
39.
316.
41.
73.
0.
8.
674.
11.
362.
9.
58.
5425.
58.
137.
0.
11.
1078.
19.
62.
0.
20.
142.
21.
359
0
81
5491
71
0.
0.
0.
0.
0.
469.
4.
56.
4125.
69.
6.
0.
2.
58.
1.
*10*
0.
0.
0.
0.
0.
S.D.
0.
0.
4164.
9122.
2320.
S.D.
0.
14336.
142216.
84975.
26993.
NUMBER
0.
0.
2.
26.
97.
NUMBER
0.
2.
5.
69.
49.
*11*
0.
0.
0.
0.
0.
*12*
860.
0.
860.
860.
0.
MAX
MIN
AVE
TOT
SD
*1*
20.
0.
6.
49.
7.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
2.
0.
1.
44.
0.
45.
0.
4.
350.
6.
8.
0.
1.
107.
1.
28.
0.
7.
49.
10.
23
0
4
259
5
0.
0.
0.
0.
0.
9.
0.
2.
121.
1.
2.
0.
0.
11.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
28.
0.
28.
28.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
RHODE ISLAND
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 125
CO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
95.
0.
37.
293.
39.
*2*
73.
0.
7.
614.
10.
MAXIMUM
3000.
13U7.
1135992.
79313.
217696.
O6M
900713.
MINIMUM
10.
3.
8881.
669.
1947.
ANNUAL COST OF WASTE
REPLACEMENT
818920.
DISTRIBUTION OF OPERATION
MAXIMUM
0.
0.
79313.
37247.
9875.
o
MAXIMUM
0.
1419990.
884330.
463887.
97839.
DISTRIBUTION
*3* *4*
362. 137.
8. 0.
54. 9.
5030. 934.
55. 17.
MINIMUM
0.
0.
73425.
10431.
669.
AVERAGE
388.
91.
131027.
7206.
23846.
TREATMENT
INTEREST
1261136.
AND MAINTENANCE COST
AVERAGE
0.
0.
76369.
16045.
3911.
TOTAL
48494.
11369.
16378401.
900713.
2980740.
TOTAL
2980769
TOTAL
0.
0.
152738.
352991.
394985.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1056449.
502827.
100611.
11101.
AVERAGE
0.
1238219.
620061.
177459.
63424.
TOTAL
0.
2476439.
3100305.
11534803.
3361459.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
62. 306.
0. 0.
20. 73.
142. 4934.
21. 61.
*7* *8*
0. 469.
0, 4.
0. 50.
0. 3734.
0. 65.
*9* *10*
5. 0.
0. 0.
2. 0.
50. 0.
1. 0.
S.D.
5114.
159.
151912.
10537.
29201.
*11*
0.
0.
0.
0.
0.
S.D.
0.
0.
4164.
6421.
2238.
S.C.
0.
257061.
168880.
75170.
25471.
NUMBER
0.
0.
2.
22.
101.
NUMBER
0.
2.
5.
65.
53.
*12*
647.
0.
647.
647.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8» *9*
20.
0.
6.
46.
7.
2.
0.
0.
42.
0.
45.
0.
3.
313.
6.
8.
0.
1.
93.
1.
28.
0.
7.
49.
10.
18
0
3
219
4
0.
0.
0.
0.
0.
9.
0.
1.
111.
1.
1.
0.
0.
9.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
21.
0.
21.
21.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
T^TAL
CF M/\MIF ACTUF INC PI ANTS...
SOUTH CAROLINA
FL )*» AT ORSEPVFC 1968 LEVEL
196B FLOW CONDITIONS < 1567 DCLLAPS)
"/• NUFA.C Tl "IN.G F«"PinyfF:NT
FL FV ("CY )
TOTAL C«PI
TPT4L WNli
T^TAL KNKii
CPST RM'^F
> ^roccc.
1 OO^ PO • TO
60000. TO
imoo. TO
r, , jo
CO rrST ^^.(.f.
O > sooprvo.
srooon. TO
iroorc. in
0. Tf
TAL TOST
M Of." COST
AL TOST
^OPOP.
icooor.
*C ">0f.
lOOOr.
crrcooo.
10POPOC .
6fooor.
If 0000.
VAX IMUM
6C50.
471=3.
I 3 683921 .
96P«?5.
24572-6.
05*1
64412J3.
!)I STH
P fl X I >•• ':> M
« 6 8 B ? 5 .
411SE5.
87^10.
4 8C5 9.
T-,-44.
1" ft XI%'UM
\(-< 1R6L44.
T)')252 '?.
r>';i32': 1.
439 ?09 .
^'i'ipa.
MINIMUM
7.
?.
18065.
038.
4092.
ANNUAL COST OF nAST
orPLACbMFNT
5602741.
IBLTICK CF OFFRSTICN
M IN I'1UM
6 "1 2?07 .
11 C565.
5 (543.
1 CO 1 1 .
938.
OISTRIPUT ION OF INV
MINI MUM
6015P U .
I 199966 .
521277.
1 }2l?l .
?2582 .
AVtRAGE
671.
742.
434321.
24974.
80131.
E TREATMENT
INTEREST
R62821 7.
*NC PSIN-TENANCt CCST
AVERAGt
734179.
220739 .
70304.
1 7749 .
5439 .
ESTMENT KEQU IF-.EMENTS
AVERAGE
1CS93304.
2099220 .
676243.
253290.
69874 .
TOTAL
160235.
191393.
112054832.
6443223.
20673856.
TOTAl
20674176.
TOTAL
2202536.
1324433.
492128.
1597427.
826753.
TOT AL
43973216.
29399088.
18258560.
46352032.
2096211.
S.O.
684.
3628.
1207398.
88053.
238679.
S .0.
233322.
110638.
10004.
7641.
2349.
S .0.
5071617.
977379.
133596.
106376.
21711.
NUMBER
3.
6.
7.
90.
152.
NUMBER
4.
14.
27.
183.
30.
IMSTRIPHTICN OF TOTAL CAPITAL CCST FOR TREATMENT ($ 10COI
c *4* *6* * 6* *7* ff* *9*
*10*
*ll*
*12*
MA*
MJM
AVF
TOT
4<;^.
^.
143.
171 .
3°9.
1 .
19.
?] 44.
4^ .
I? 76. 3H64.
r. o.
ICK. 77.
IC6^P. U751.
I**-. 4C1.
112.
R.
28.
669.
26.
1466 .
0.
220.
40213.
3(4.
42.
0 *
35.
104.
6.
3464.
9.
164.
34P45 .
360.
8.
0.
3.
. 106.
2 .
C.
0.
C.
0.
0.
5083.
0.
5083.
5083.
0.
1597.
0.
1597.
1597.
0.
*?*
01 ?1S IBLTI ON DF ANNUAL C6!" 1PE/TPENT CCSTS (i 1000)
•I-'** «'.* *t* *7* *8*
*10*
*11*
*12*
"Ax
MINJ
WF
TOT
ID
31
O.
I'-.
QC .
1 }.
'•
0.
1 .
7" .
1 .
?f 6 .
r.
P.
P5« .
27.
16' .
0 .
4.
743.
15.
84.
1 .
14.
274.
?2.
639.
0 .
1<> .
2978.
66.
2.
) .
i .
5.
I .
169.
0.
5 .
'J59.
14 .
I.
0.
1 .
13.
0.
0.
C.
0.
0.
0.
393.
0.
3S3.
393.
0.
47.
0.
47.
47.
0.
SD
«.1.
Rt
STAI-.il/VRn OVIATICN.
THE DATA OISTRIBUTIC\ UStC
HIGHLY SKEWED.
-------
SOUTH CAROLINA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 258
MANUFACTURING EMPLOYMENT
PLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
CO COST RANGE
CO > 5000000.
(-* 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
343.
0.
116.
809.
123.
*2*
314.
1.
16.
1830.
37.
MAXIMUM
6050.
24756.
8542861.
557087.
1541498.
OSM
4944313.
MINIMUM
AVERAGE
7. ' 621.
5.
17374.
823.
3056.
ANNUAL COST OF WASTE
REPLACEMENT
4629770.
500.
358897.
19164.
64745.
TREATMENT
INTEREST
7129844.
TOTAL
160235.
129088.
92595424.
4944313.
16704082.
TOTAL
16703927
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
557087.
456555.
93173.
43387.
9870.
MINIMUM
557087.
100338.
54919.
10142.
823.
AVERAGE
557087.
242159.
70793.
18226.
5334.
TOTAL
557087.
1695112.
353964.
1458106.
880102.
Ki
DISTRIBUTION OF INVESTMENT REQUIREMENTS 9
MAXIMUM
10678576.
4884566.
972246.
492514.
99262.
DISTRIBUTION
*3* *U*
1223. 2046.
0. 0.
94. 49.
9464. 10055.
143. 218.
MINIMUM
8351568.
1027821.
500314.
100749.
21717.
OF TOTAL CAPITAL COST
*5* *6*
99. 2425.
7. 0.
26. 193.
526. 35374.
23. 260.
AVERAGE
9515072.
2166259.
671046.
250754.
72292.
FOR TREATMENT ($ 1000)
*7* *8*
42. 2288.
0. 9.
34. 138.
103. 29396.
6. 245.
TOTAL
19030144.
32493888.
17447184.
43882032.
2891669.
*9* *10*
6. 0.
0. 0.
2. 0.
86. 0.
1. 0.
S.D.
684.
1994.
794533.
56347.
155008.
S.D.
0.
144827.
18329.
8293.
2384.
S.D.
1645450.
1354420.
147907.
109488.
22269.
NUMBER
1.
7.
5.
80.
165.
NUMBER
2.
15.
26.
175.
40.
*11*
3356.
0.
3356.
3356.
0.
*12*
1597.
0.
1597.
1597.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
28.
0.
13.
88.
12.
3.
0.
1.
64.
0.
250.
0.
7.
738.
25.
90.
0.
3.
522.
9.
66.
1.
12.
239.
18.
375
0
12
2225
34
2.
0.
2.
5.
1.
91.
0.
3.
740.
8.
1.
0.
0.
13.
0.
*10*
0.
0.
0.
0.
0.
*11*
262.
0.
262.
262.
0.
*12*
47.
0.
47.
47.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SOUTH CAROLINA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 258
CO
to
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000,
0. TO 100000.
*1*
*2*
MAXIMUM
6050.
18590.
6975U99.
436535.
1257191.
OSM
3747166.
MINIMUM
7.
4.
9253,
700.
1939.
ANNUAL COST OF WASTE
REPLACEMENT
3810502.
DISTRIBUTION OF OPERATION
MAXIMUM
0.
436535.
82610.
49752.
9739.
MINIMUM
0.
155498.
65660.
10305.
700.
AVERAGE
621.
358.
295388.
14524.
52039.
TREATMENT
INTEREST
5868172.
AND MAINTENANCE COST
AVERAGE
0.
297923.
77203.
17382.
4989.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
8719373.
4015830.
937727.
497712.
97614.
MINIMUM
6820783.
1198419.
509263.
100979.
11566.
AVERAGE
7770078.
2065673.
726792.
259176.
69755.
TOTAL
160235.
92393.
76210064.
3747166.
13425984.
TOTAL
13425840.
TOTAL
0.
1191693.
463218.
1199349.
892956.
TOTAL
15540156.
16525387.
15989427.
43023136.
4185270.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
123.
0.
51.
359.
50.
166.
1.
11.
1242.
19.
609.
0.
70.
7118.
77.
1543.
0.
34.
6973.
158.
66.
5.
20.
395.
14.
2069
0
171
31288
217
38.
0.
31.
93.
6.
1903.
4.
116.
24681.
195.
4.
0.
2.
69.
1.
*10*
0.
0.
0.
0.
0.
S.D.
684.
1416.
616207.
40283.
117563,
S.D.
0.
128741.
6418.
8028.
2430.
S.D.
1342501.
898063.
127608.
107021.
20822.
NUMBER
0.
4.
6.
69.
179.
NUMBER
2.
8.
22.
166.
60.
*11*
2791.
0.
2791.
2791.
0.
*12*
1200.
0.
1200.
1200.
0.
MAX
MIN
AVE
TOT
SD
*1*
16.
0.
7.
47.
6.
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
2.
0.
0.
55.
0.
93.
0.
4.
439.
10.
70.
0.
2.
376.
6.
32.
0.
7.
131.
9.
297
0
10
1823
26
2.
0.
1.
4.
0.
70.
0.
3.
607.
6.
1.
0.
0.
10.
0.
*10*
0.
0.
0.
0.
0.
*11*
219.
0.
219.
219.
0.
*12*
36.
0.
36.
36.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER CF PANT F ACTl'P INP PLANTS...
SOUTH DAKOTA
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITtCNS ( 1967 CCLLARS)
22
CO
to
CO
MANUFACTURING
Fl DW tMGY )
TOTAL CAPITAL COST
TOTAL ANNUAL G£P COST
TDT4L iNNMU COST
COST R4NGF
> 5POODO.
innonc. TO
50000. TO
tonoo. TC
0. TO
COST RANGE
> 5000000.
tcnroco. TO
500000. Til
nooon. in
n. TO
5COOOO.
1COOOO.
10000.
socooor.
1COCOOO.
500000.
1 00000.
f A X I M 11*1
2500.
2251.
391244.
89177.
2C2365.
OEM
2S6877.
DISTP
MAXIMUM
0.
0.
9S177.
245fi5.
SRlS?.
MAXIMUM
0.
1 L 14154.
C.
39<56f 5.
9379?.
MI N'IMUM
22
10
?7341
l^ng
5135
4NMJM COST OF W
PFPLACEMENT
AVERAGF
324.
27B.
166333.
13494.
34619.
SSTE TKE4TMENT
INTERFST
132966. 2S1767.
[BUT ION OF fJPERAT
MINI MU«
0.
0 .
31;! 77.
t 1291.
1509.
0 ISTfmUTlHN OF
MINIMUM
0.
I U4054.
0.
1114U.
34177 .
ION AND MAINTENANCE COST
AVEPAGF
0.
0.
09177 .
16647.
4034.
INVESTMENT RFOUIPFMEN1S
4VER4GE
0.
1114054.
0 .
184200.
51477.
TOTAL
7120.
6123.
3659318.
296877.
761611.
TOTAL
761610.
TOTAL
0.
0.
178354,
49940.
<>8584.
TOT^L
0.
2228108.
0.
I 702 797.
643251.
s.o.
712.
646.
243858.
25109.
56C43.
s.o.
0.
0.
0.
7013.
2900.
S.D.
0.
1024.
0.
84495.
17788.
NUMBER
0.
0.
2.
3.
17.
NUMBER
0.
2.
0.
.
11.
MAX
MIN
AVF
TOT
so
C.
0.
0.
^.
0.
98 .
2.
32 .
2P4.
38.
124.
0.
37.
4P4 .
2P.
21 .
0.
R.
25.
11 .
69.
17.
33.
265.
23.
57.
0 .
57.
57.
0 .
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TREATMENT ($ 1000)
*4* *5* *6* *7*
0.
0.
0.
0.
0.
692.
14.
] 22 .
2446.
203.
32.
0.
11 .
98.
12.
*10*
C.
C.
o.
0.
C.
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
DISTRI3UTICN OF SNN'J
M 4X
HIM
AVE
THT
sn
*1*
C .
0.
0.
o.
*2*
2.
0 .
1.
11.
0.
3.
0.
1 .
54.
4.
22.
06U TR£«TME\T COSTS ($ 1000)
*f* *7* * 8*
3.
0.
3.
).
0.
0 .
0.
~l .
0.
r.
22 .
I .
4.
77 .
6.
*9*
11 .
0.
3.
29.
4.
* 10*
0.
0.
C.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SC HP S.H. RFPPESFNTS STANC/SRC CEVIATION. THE DATA DtSTHlBUTICN LStD IS HIGHLY SKEWED.
-------
SOUTH DAKOTA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 22
CO
HO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAX
MIN
AVE
TOT
SD
MAXIMUM
2500.
1442.
670252.
62016.
11)7138.
OgM
215951.
MINIMUM
22.
10.
26930.
1189.
4609.
ANNUAL COST OF WASTE
REPLACEMENT
142125.
DISTRIBUTION OF OPERATION
MAXIMUM
0.
0.
62016.
17426.
8146,
MINIMUM
0.
0.
62016.
14064.
1189.
AVERAGE
324.
182.
129205.
9816.
26225.
TREATMENT
INTEREST
218872.
AND MAINTENANCE COST
AVERAGE
0.
0.
62016.
15745.
3357.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
0.
837815.
301696.
83982.
MINIMUM
0.
0.
837815.
101853.
33663.
AVERAGE
0.
0.
837815.
156502.
52124.
TOTAL
7120.
4007.
2842499.
215951.
576949.
TOTAL
57694S.
TOTAL
0.
0.
124031.
31491.
60429.
TOTAL
0.
0.
1675629.
1252017.
625488.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *i»* *5* *b* *7* *8* *9*
0.
0.
0.
0.
0.
70.
2.
23.
204.
28.
124.
0.
33.
426.
29.
21.
0.
8.
25.
11.
57.
14.
27.
217.
19.
46.
0.
46.
46.
0.
0.
0.
0.
0.
0.
520.
11.
93.
1853.
152.
24.
0.
8.
73.
9.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
S.D.
712.
413.
182288.
17411.
40536.
S.D.
0.
0.
64.
2377.
2297.
S.D.
0.
0.
0.
63815.
17213.
NUMBER
0.
0.
2.
2.
18.
NUMBER
0.
0.
2.
8.
12.
*12*
0.
0.
0.
0.
0.
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
MAX
MIN
AVE
TOT
SD
*1*
0.
0.
0.
0.
0.
*2*
2.
0.
1.
8.
1.
*3*
11.
0.
2.
25.
3.
*4*
3.
0.
1.
3.
1.
*5*
37.
3.
13.
102.
15.
*6*
2.
0.
2.
2.
0.
*7*
0.
0.
0.
0.
0.
*8*
16.
1.
3.
57.
4.
*9*
7.
0.
2.
19.
3.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OP. S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SOUTH DAKOTA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 22
CO
I-;:
cn
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 5COOOO.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAX
MIN
AVE
TOT
SD
MAXIMUM
2500.
1051.
548065.
48081.
117688.
OSM
170550.
MINIMUM
22.
8.
23190.
1025.
3970.
ANNUAL COST OF WASTE
REPLACEMENT
117799.
DISTRIBUTION OF OPERATION
MAXIMUM
0.
0.
0.
18084.
6503.
MINIMUM
0.
0.
0.
10769.
1025.
AVERAGE
324.
131.
107090.
7752.
21353.
TREATMENT
INTEREST
181U11.
AND MAINTENANCE COST
AVERAGE
0.
0.
0.
30163.
2772.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
0.
685081.
247290.
93812.
MINIMUM
0.
0.
685081.
101321.
28987.
AVERAGE
0.
0.
685081.
111682.
51767.
TOTAL
7120.
2941.
2355985.
170550.
469761.
TOTAL
469759.
TOTAL
0.
0.
0.
120651.
49899.
TOTAL
0.
0.
1370161.
850092.
724738.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
56.
2.
18.
161.
22.
103.
0.
28.
367.
24.
15.
0.
6.
19.
8.
49
12
24
188
16
40.
0.
uo.
40.
0.
0.
0.
0.
0.
0.
124.
9.
76.
1521.
124.
19.
0.
7.
59.
7.
*10*
0.
0.
0.
0.
0.
S.D.
712.
301.
148449.
13150.
32286.
S.D.
0.
0.
0.
20728.
1796.
S.D.
0.
0.
810.
54160,
21222.
NUMBER
0.
0.
0.
4.
18.
NUMBER
0.
0.
2.
6.
14.
*11*
0.
0.
0.
0.
0.
+ 12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
0.
0.
0.
0.
0.
*2*
2.
0.
1.
7.
0.
*3*
9.
0.
2.
20.
2.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*y* *5* *6* *7* *8* *9*
2.
0.
1.
3.
1.
29.
2.
10.
78.
12.
2.
C.
2.
2.
0.
0.
0.
0.
0.
0.
12.
1.
2.
47.
3.
6.
0.
2.
14.
2.
*10*
0.
C.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
PF U4MJ(- \C TUR TNT PL5NTS...
TFNNEiStE
Ft OW AT (IBSEB VI-C
1963 FLOW CONDITIONS (
37 a
196R LEVEL
1967 DOLLARS)
INT EMPLOYMENT
CUPITU CPST
Otf
!>• \ x I M u M
140JO.
Ml
TPTU AVMIAI
?2145040.
4?22?71.
15.
7.
PfO.
2957.
579.
715.
40B055.
30156.
81976.
TOTfVL
189915.
234656.
133342080.
939U57.
26388128.
S.D.
I 166.
3492.
1584121.
t 18488.
313014.
ANNUAl COST OF HASTE TREATMENT
CO
CO
C°ST PANGC
Tf 5COO 30.
50100. Tn iccroc.
lOOO'l. TP ^00^0.
0. TO I.OOOC.
COST
1000000. TP C00000f.
5000C<-. ir ircOOOG.
100000. TO 5CCCOO.
0. TP 1000.10.
#1*
OS"*
9^91 157.
OISTK
^ \ X I MO V
147255?.
362 a f 1 .
95850.
45175.
9967.
RE PL 1C EMtNT
f692 103.
IBUTinN OF GPERAtrCN AND
M IN I'-IUM
R99139.
108856.
54529.
1C05C.
860.
INTEREST
10305835.
MAINTENANCE CCST
AVE^^GE
1 1535-91 .
19R318.
70876.
18938.
4540.
131 STRIHUTION OF INVESTMENT RI-CU IREMENTS
VAX IfUvi
27556288.
4^56183.
962P63 .
'. 9 fc C 1 3 .
9<5334.
MINIMI!"
5363490 .
1063470.
50C552.
100393.
1 5£ 55.
AVhRAGF
14466220.
2335770.
689972.
205528 .
63675.
TOT4L
26889088.
3460773.
2776450.
1134010.
1552902.
967C83.
TOTAL
57864880.
56058496.
11039552.
35145248.
7195273.
DISTRIBLTICN OF TOT HL C4PITU CCST FCR TREATMENT it 10001
*7* *g* *<5*
* 1 0*
s.o.
262008.
79820.
13452.
S963.
2458.
S.D.
10666827.
1333394.
131448.
98800.
22881.
NUMBER
3.
14.
16.
82.
213.
NUMBER
4.
24.
16.
171.
113.
*11*
*12*
MAX
wr N
AVE
YOT
sn
1 057*.
0.
6C3.
11769.
2543.
8^° .
1 .
23.
469? .
75 .
?841.
0.
130.
266PO.
283.
4433.
fi
•j .
97.
22110.
427 .
266.
6.
27.
1095.
42.
2045.
0.
192 .
27631.
333.
53.
0.
40.
240.
3.
3981 .
6.
149.
30631.
403.
17.
1.
3.
223.
3.
1947.
0.
1947.
1947.
C.
5544. .
0.
5544.
5544.
0.
1777.
0.
1777.
1777.
0.
MAX
M IN
AVE
TOT
SO
* 1 *
186.
0 .
17.
44.
*2*
I 1 .
0.
I .
I .
CISTRIBUTION OF ANNUAL OEM TREATMENT COSTS ($ IOCO)
*4* *5* *6* *7* *8*
9*2.
" •
17.
3454.
7T .
150.
C.
5.
1751 .
17.
50 j.
1 .
23.
934.
79.
248.
0.
16.
2242.
40.
5.
0.
3.
16.
1 .
184.
0.
5.
963.
16 .
4
0
1
45
1
*10*
4.
0.
4.
4.
0.
*11*
475.
0.
475.
475.
0.
*12*
58.
0.
58.
58.
0.
SO
S.O. PFPPESFNTS ST\NC4Pn OEVC4TinN. THE DATA DI STRI fit'T ICN USED IS HIGHLY SKEWED.
-------
TENNESSEE
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS < 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 328
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
11*000.
46821.
22045040.
1U22552.
1222271.
MINIMUM
15.
7.
12524.
860.
2957.
AVERAGE
579.
597.
360922.
26050.
71884.
TOTAL
189915.
195922.
118382320.
8544376.
23577984.
S.D.
1166.
3234.
1456012.
110920.
289215.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
85414376.
5919115.
9115434.
TOTAL
23578912.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
*1*
*2*
MAXIMUM
1422552.
308302.
95850.
45175.
9967.
MAXIMUM
27556288.
4956188.
962863.
496098.
98927.
MINIMUM
652433.
118726.
50934.
10041.
860.
AVERAGE
1071355.
206959.
68880.
18983.
4449.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
6180316.
1066293.
546214.
100393.
15655.
AVERAGE
15803418.
2209553.
719126.
202163.
64026.
TOTAL
3214067.
1655670.
1239836.
1442696.
992171.
TOTAL
47410256.
50819728.
7910390.
33963312.
7875182.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *n* *5* *6* *7* *8* *9*
*10*
MAX
MIN
AVE
TOT
SD
10526.
0.
651.
11060.
2545.
899.
1.
20.
4240.
73.
2841.
0.
119.
24438.
274.
3933.
0.
79.
18131.
358.
266.
6.
24.
978.
41.
1622
0
170
24539
287
S.D.
389500.
60790.
15049.
10415.
2399.
S.D.
10845973.
1322792.
119128.
91842.
22177.
NUMBER
3.
8.
18.
76.
223.
NUMBER
3.
23.
11.
168.
123.
*11*
*12*
39.
0.
35.
207.
5.
3981.
6.
132.
26993.
364.
11.
0.
2.
191.
2.
1947.
0.
1947.
1947.
0.
4188.
0.
4188.
4188.
0.
1469.
0.
1469.
1469.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS {$ 1000)
*tl* *5* *6* *7* *8* *9*
186.
0.
16.
279.
44.
11.
0.
1.
145.
1.
982.
0.
15.
3099.
74.
150.
0.
5.
1055.
16.
503.
1.
19.
796.
78.
212.
0.
13.
1867.
33.
3.
0.
2.
11.
1.
184.
0.
4,
843.
14.
3.
0.
0.
35.
0.
*10*
4.
0.
4.
4.
0.
*11*
362.
0.
362.
362.
0.
*12*
49,
0.
49.
49.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TENNESSEE
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 328
CO
t\3
CO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
14000.
30784.
13601761.
988628.
2716051.
OSM
6510142.
MINIMUM
15.
6.
9873.
860.
2287.
ANNUAL COST OF WASTE
REPLACEMENT
4684238.
AVERAGE
579.
427.
285624,
19848.
56121.
TREATMENT
INTEREST
7213723.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
988628.
242263.
88786.
47920.
9889.
MINIMUM
529572.
109526.
54184.
10103.
860.
AVERAGE
766276.
165964.
67052.
20741.
4229.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
17002192.
4474366.
917828.
494184.
99617.
MINIMUM
11136555.
1008469.
532793.
100218.
12341.
AVERAGE
14069368.
2091678.
723237.
196914.
62868.
TOTAL
189915.
139904.
93684768.
6510142.
18407664.
TOTAL
18408096.
TOTAL
2298827.
1161745.
603468.
1431157.
1015015.
TOTAL
28138736.
41833568.
8678839.
29340176.
9115869.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
*10*
MAX
MIN
AVE
TOT
SD
5218.
0.
330.
5616.
1260.
657.
1.
16.
3322.
54.
2169.
0.
97.
20062.
211.
2601.
0.
57.
13056.
248.
220.
5.
21.
845.
33.
1384
0
149
21498
240
S.D,
1166.
2176.
987595.
78789.
200077.
S.D.
229865.
47137.
12173.
11428.
2396.
S.D.
4147677.
1158665.
144683.
88005.
22184.
NUMBER
3.
7.
9.
69.
240.
NUMBER
2.
20.
12.
149.
145.
*11*
*12*
36.
0.
31.
187.
4.
3040.
5.
111.
22742.
287.
8.
0.
2.
159.
1.
1610.
0.
1610.
1610.
0.
3483.
0.
3483.
3483.
0.
1104.
0.
1104.
1104.
0.
MAX
MIN
AVE
TOT
SD
*1*
132.
0.
12.
207.
31.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
8.
0.
1.
128.
1.
672.
0.
11.
2250.
51.
103.
0.
3.
788.
11.
356.
1.
14.
574.
55.
167
0
10
1507
26
2.
0.
1.
9.
0.
123.
0.
3.
679.
10.
2.
0.
0.
27.
0.
*10*
3.
0.
3.
3.
0.
*11*
302.
0.
302.
302.
0.
*12*
37.
0.
37.
37.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMREP OF MANUFACTURING Ft ANTS...
TEXAS
FLOW &T OBSERVEC 1968 LfeVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
630
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TDT4L &NNU&L OEM COST
TOTAL ANNUAL COST
MAX I MUM
12600.
469-587.
1007273984.
1302319?.
140946944.
MINIMUM
15.
1.
6625.
433.
1275.
AVERAGE
418.
3150.
3258196.
135659.
549407.
TOTAL
263350.
1984452.
2C52663552.
85465008.
346126592 .
S.O.
21 181.
40681616.
631258.
5739139.
ANNUAL COST OF hASTE
H6M REPLACEMENT
«=4£5CC8. 102633166.
TREATMENT
INTEREST
158055008.
TOTAL
346152960.
to
CrST RANGF.
> 5CCOCC.
looooo. TP
50000. TO
10000. m
0. TO
OISTRI8LTICN OF GPERSTICN JhC MAINTENANCE CCST
500000.
100000.
sccoc.
10000.
COST P4NGF
> 500CCOC.
1000COO. TO 5CCCOOC.
500000. TC 1000000,
IOOOCO. TO 5COOOO.
o. TO icooor.
MAX
MIN
AVF
TOT
sn
*i*
933^7f.
n.
131^976.
°n29.
MAXIMUM
13023192.
4fll3«6.
"7399.
4S549.
995fl.
MAXIMUM
1259092480.
4676370.
MINIMUM
"501852.
103901 .
50758.
10046.
433.
AVERAGE
1601355.
264947
72530
22170
4915
DISTRIBUTION OF INVESTMENT REQUIREMENTS
4^6428.
MINIMI)"
50*6823.
1001198.
503993.
100174.
8281.
AVERAGE
45L01328.
?478572.
661607.
203129.
63428.
TOTAL
5925C144.
18281344.
2973745.
3325477.
1636625.
TOTAL
2300168448.
163585776.
33030368.
57688640.
11353613.
IMSTRIB'JT ICN OF TOTAL CAPITAL COST FOR TREATMENT ($ 10COI
* 6*
5127
r
111?'.
0.
3«')36.
0.
*7*
*8*
*9*
*10*
33°
213"?.
6b.
7.
73.
4 A.
17.
3344.
0.
224.
47M6 .
469.
74.
0.
62.
311.
9.
17886.
9 .
399.
1426 68 .
1 3 3B .
30.
0.
3.
383.
3.
10770.
0.
1077C.
1077C.
0.
S.O.
2117304.
109001.
13420.
11217.
2545.
S.D.
175083120.
1227268.
I 19750.
93603.
21552.
*U*
0.
0.
0.
0.
0.
NUMBER
37.
69.
41.
150.
333.
NUMBER
51.
66.
50.
284.
179.
*12*
24581.
0.
4044.
173910.
49 13.
DI $T
7^450
24?
2 C .
"ft 17.
30.
16315.
50C6.
f9.
*7*
16.
0.
10.
49.
4.
?459.
1
23
3330.
14?.
*9*
11 .
0.
1 .
90.
I.
*IC*
15.
0.
15.
15.
C.
*11*
0 .
0.
0.
0 .
0.
*12*
9U.
0.
155.
6682.
183.
SO HR S.iO. PfpPESFN-T* STANTARC rrytATICN. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TEXAS
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 630
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
12600.
75127.
11570196.
2527266.
7806717.
MINIMUM
15.
1.
4296.
324.
869.
AVERAGE
418.
720.
636740.
U5185.
126057.
TOTAL
263350.
453701.
1*01146112.
28466864.
79415808.
S.D.
914.
3534.
2461406.
148697.
456280.
OEM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
28466864.
20057296.
30888224.
TOTAL
79412384.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CO
CO
O
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
2527266.
490134.
95969.
49756.
9955.
MAXIMUM
51963120.
4930840.
987780.
496428.
99979.
MINIMUM
599806.
101186.
50817.
10089.
324.
AVERAGE
994198.
210793.
71093.
21660.
4692.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5368195. 12689106.
1002662. 2463578.
512196. 7C7867.
100438. 200138.
5370. 64029.
TOTAL
8947779.
12436806.
1564055.
3812174.
1708018.
TOTAL
253782128.
145351136.
29730432.
58840512.
13766324.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT (? 1000)
*3* *ii* *5* *6* *7* *8* *9*
*10*
MAX
MIN
AVE
TOT
SD
24662.
0.
752.
78968.
2739.
1305.
0.
32.
13097.
89.
3376.
0.
174.
68139.
286.
6390.
0.
82.
35322.
358.
335.
3.
37.
3973.
49.
1469.
0.
138.
29598.
210.
45.
0.
38.
190.
6.
5502.
9.
163.
58408.
415.
15.
0.
2.
330.
2.
4176
0
4176
4176
0
S.D.
600521.
98641.
15274.
10262.
2449.
S.D.
11830863.
1164315.
142781.
92357.
21845.
0.
0.
0.
0.
0.
NUMBER
9.
59.
22.
176.
364.
NUMBER
20.
59.
42.
294.
215.
*12*
14905.
0.
2534.
108972.
2993.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
322.
0.
37.
3912.
56.
18.
0.
1.
425.
1.
702.
0.
23.
9022.
59.
267.
0.
6.
2465.
17.
872.
0.
36.
3849.
98.
245
0
11
2327
28
4.
0.
3.
13.
1.
346.
1.
6.
2136.
21.
5.
0.
0.
70.
1.
*10*
8.
0.
8.
8.
0.
*11*
0.
0.
0.
0.
0.
*12*
560.
0.
99.
4243.
113.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TEXAS
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 630
CO
CO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
6356.
0.
322.
33794.
900.
*2*
670.
0.
21.
8599.
50.
MAXIMUM
12600.
30784.
19248848.
1161824.
3321971.
O£M
18813088.
MINIMUM
15.
0.
3477.
290.
732.
ANNUAL COST OF WASTE
REPLACEMENT
13434815.
DISTRIBUTION OF OPERATION
MAXIMUM
1 161824.
491766.
96886.
49866.
9803.
MINIMUM
615914.
102196.
50817.
10123.
290.
AVERAGE
418.
407.
426502.
29862.
84026.
TREATMENT
INTEREST
20689600.
AND MAINTENANCE COST
AVERAGE
828035.
197155.
76348.
20557.
4291.
TOTAL
263350.
256586.
268696320.
18813088.
52936512.
TOTAL
52937488.
TOTAL
3312139.
8674816.
1985035.
3104163.
1737874.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
24061056.
4809508.
968443.
499571.
99937.
DISTRIBUTION
*3* *4*
1902. 2652.
0. 0.
127. 45.
49667. 19467.
189. 159.
MINIMUM
5028106.
1014334.
500238.
100130.
4346.
AVERAGE
9567992.
2322972.
680035.
202016.
62156.
TOTAL
124383904.
116148640.
27201392.
51110080.
17030688,
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
224. 1253.
3. 0.
27. 119.
2902. 25498.
32. 175.
*7* *8*
41. 3100.
0. 9.
34. 114.
171. 40844.
5. 245.
*9* *10*
13. 3351.
0. 0.
2. 3351.
271. 3351.
2. 0.
S.D.
914.
1599.
1358296.
87082.
255667.
S.D.
250390.
101908.
14951.
9599.
2309.
S.D.
6114805.
1015959.
128821.
100355.
22408.
NUMBER
4.
44.
26.
151.
405.
NUMBER
13.
50.
40.
253.
274.
*11*
0.
0.
0.
0.
0.
*12*
11203.
0.
1957.
84131.
2281.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
220.
0.
25.
2617.
38.
10.
0.
1.
339.
1.
376.
0.
15.
5739.
35.
120.
0.
4.
1537.
9.
418.
0.
19.
1996.
47.
194
0
9
1852
22
3.
0.
2.
11.
1 .
145.
1.
4.
1363.
10.
4.
0.
0,
53,
0.
•MO*
6.
0.
6.
6.
0.
*11*
0.
0.
0.
0.
0.
*12*
424.
0.
77.
3300.
87.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
THTAL NIIMBEP OF MANUFACTUR
MAN'DFACTIIPING FMPLCYPfNT
Fl OW ( MG Y)
TOTAL CAPITAL COST
TOTAL ANM.A1 C£M CTST
TOTM ANNUAL COST
COST RANCF
> 100000.
l^COCC. T'i 5COOOO.
loooo. TO loooor.
10000. T? 10000.
0. TO 1COOO.
CO
O0 CPST RANGF
CO > 1000010.
1 TOOOOO. T^ 1000000.
ic orco. TO iccooor.
100000. TO 500000.
0. TO 100000.
ft 1 * * 2*
MAX 1379. 30^.
M I K 0 . 2 .
AVF 401. 41.
TOT l<-3?. 15*2.
SO c-47. 61.
INC PLANTS...
'•'A XI MUM
2010.
7296.
41 24?f 2.
6742?6.
1 191045.
OGM
27C6994.
OISTR
MVXI MUM
6 7 4 ? 2 <-. .
393240.
83841.
47869.
9965.
LTAH
FLOW AT OBSERVED
1968 FLOW CONDITIONS (
57
MINIMUM
3.
5.
24783.
1196.
4445.
ANNUAL COST OF WASTE
REPLACEMENT
1175467.
1968 LEVEL
1967 DOLL \RS )
AVERAGE
764.
568.
412445.
47491.
99872.
TREATMENT
INTEREST
181021«.
TOTAL
15026.
32348.
23509344.
27C6994.
5692685.
TOTAL
5692679,
IBUTION OF OPERATION AND MAINTENANCE CCST
"INIMUM
674226.
232890.
53029.
13102.
1196.
4VERAGE
674226.
316786.
72037.
30874.
5039.
TOTAL
674226.
950359.
432220.
493981 .
156217.
DISTRIBUTION CF INVESTMENT RETIREMENTS
f'AXl MUW
51 5? 7C?.
2734003.
64933S.
482780.
19648.
OISTR I3UTION
* 3* *4*
134P. 697.
o. 0.
711. 96.
7177. 3266.
3C7. 165.
MINIMUM
5155702.
1055777.
533600 .
10C792.
3C"78.
OF TOTAL CAPITAL CCST
*5* *6*
46. 651.
n. o.
27. 216.
151. 4329.
13. 1 96 .
AVERAGE
5155702.
1566446.
572353.
214163.
56866.
FCR TREATMENT <$ 1000
*7* *8*
35. 406.
0 . 8 .
35. 99.
35. 3480.
0 . 1 06 .
TOTAL
5155702.
15664464.
1717059.
5996164.
852986.
1
*9* *10*
6. 0.
0. 0.
2. 0.
22. 0.
2. C.
S.D.
461.
1430.
686511.
111025.
195537.
S.O.
0.
80434.
11927.
12048.
2631.
S.D.
NUMBER
I.
3.
6.
16.
31.
NUMBER
0. 1.
545898. 10.
66676. 3.
97533. 28.
22318. 15.
*11* *12*
0. 1035.
0. 0.
0. 936.
0. 1871.
0. 141.
*2*
*?#
C ISTRt ei.JTICN OF 4NNU 1L C EM TREATMENT COSTS ($ 1000)
#4* *S* *fi* *7* * 8*
M4X
'
-------
UTAH
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 57
CO
CO
CO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*2*
MAXIMUM
2010.
4905.
2837220.
1*76877.
837204.
06M
2026965.
MINIMUM
3.
5.
24783.
1196.
4445.
ANNUAL COST OF WASTE
REPLACEMENT
950074,
DISTRIBUTION OF OPERATION
MAXIMUM
0.
l»76877.
81371.
10601.
9429.
MINIMUM
0.
202057.
57165.
11555.
1196.
AVERAGE
264.
395.
333359.
35561.
77897.
TREATMENT
INTEREST
1463112.
AND MAINTENANCE COST
AVERAGE
0.
284711.
67957.
25161.
4555.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
3546525.
965441.
482780.
99648.
MINIMUM
0.
1359630.
565460.
101998.
30978.
AVERAGE
0.
1839597.
845896.
216436.
61717.
TOTAL
15026.
22516.
19001472.
2026965.
4440151.
TOTAL
4440150.
TOTAL
0.
1138843.
339784.
402577.
145766.
TOTAL
0.
12877183.
4229481.
5410909.
1234348.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
785.
0.
253.
1012.
355.
226.
2.
33.
1237.
51.
1048.
0.
170.
5775.
x 240.
471.
0.
68.
2318.
112.
39.
11.
20.
137.
11.
568
0
185
3710
163
35.
0.
35.
35.
0.
312.
8.
83.
2888.
84.
4.
0.
2.
19.
1.
*10*
0.
0.
0.
0.
0.
S.D.
461.
923.
507180.
77701.
139253.
S.D.
0.
128807.
8714.
10919.
2435.
S.D.
0.
762570.
159348.
109839.
24289.
*11*
0.
0.
0.
0.
0.
NUMBER
0.
4.
5.
16.
32.
NUMBER
0.
7.
5.
25.
20.
*12*
1035.
0.
936.
1871.
141.
*1*
*2*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *g* *9+
MAX
MIN
AVE
TOT
SD
114.
0.
41.
165.
48.
7.
0.
1.
49.
1.
288.
0.
31.
1043.
62.
54.
0.
7.
250.
13.
33.
2.
10.
71.
12.
48.
0.
13.
260.
14.
2.
0.
2.
2.
0.
14.
1.
3.
102.
3.
1.
0.
0.
3.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
45.
0.
41.
81.
6.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
UTAH
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 57
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OgM COST
TOTAL ANNUAL COST
MAXIMUM
2010.
3416.
2061881.
348207.
610066.
MINIMUM
3.
4.
22153.
1035.
3849.
AVERAGE
264.
265.
263960.
25949.
59472.
TOTAL
15026.
15102.
15045713.
1479085.
3389887.
S.D.
461.
647.
U05703.
58222.
106973.
OSM
1U79085.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
752286.
1158519.
TOTAL
3389889.
CO
CO
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000,
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
0. 0. 0.
348207. 157527. 244904.
87885. 50685. 71356.
33987. 10449. 21821.
8410. 1035. 4263.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE
0. 0. 0.
2577351. 1106108. 1612446.
757522. 705804. 726180.
413591. 101985. 188790.
97494. 27691. 61479.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
TOTAL
0.
734711.
285425.
305499.
153456.
TOTAL
0.
9674677.
3630898.
3964591.
1536983.
*3*
*4*
*5*
*6*
MAX
MIN
AVE
TOT
SD
482.
0.
170.
679.
211.
188.
1.
25.
964.
43.
834.
0.
131.
4456.
195.
372.
0.
48.
1634.
83.
28.
10.
16.
109.
7.
461
0
153
3060
133
*7*
32.
0.
32.
32.
0.
243.
6.
64.
2224.
60.
*9*
3.
0.
2.
16.
1.
*10*
0.
0.
0.
0.
0.
S.D.
0.
96333.
16686.
8826.
2262.
S.D.
0.
519309.
27922.
90110.
24166.
NUMBER
0.
3.
4.
14.
36.
NUMBER
0.
6.
5.
21.
25.
*11*
0.
0.
0.
0.
0.
*12*
1035.
0.
936.
1871.
141.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
84.
0.
31.
126.
36.
6.
0.
1.
42.
1.
208.
0.
21.
729.
48.
43.
0.
5.
180.
10.
18.
2.
6.
43.
6.
35.
0.
10.
196.
10.
2.
0.
2.
2.
0.
11.
1.
2.
79.
2.
1.
0.
0.
3.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
45.
0.
41.
81.
6.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF M4NUF*CTUP ING Pt^NTS..
VERMCNT
FLOW AT OBSERVED 1968 LEVFL
FLOW CONDITIONS ( 1967 DOLLARS)
37
CO
b»
cn
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOT.AL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAl COST
COST R4NGE
> 5CCCCC.
100000. in
^CCCC. TO
10000. TO
0. Tn
500000.
tcoooo.
50000.
10000.
CCST RANGE
> 5oooono.
1000000. TC ^000000.
5POOr>0. TC IOCOCOO.
100000. TO 5CCCCO.
0. TP 100000.
MHX
MIN
AVE
TCT
SO
*l*
25.
0.
20.
59.
5.
*?*
67,
I .
IP.
188 .
16 .
MAXIMUM
3COO.
2945.
1380S35.
1R3«07.
346CC6.
nG"
7C4500.
OISTR
NAX IMUM
C.
1838C7.
79540.
3S3H.
R957.
M IN IMUM
? 5.
7.
22134.
1006.
3957.
ANNUAL COST OF kASTE
RFPL&CEMENT
47452?.
IflUTION PF 1PERATICN
M IN IMUM
0.
183SC7.
51644 .
101 58.
1006.
AVERAGE
3S3.
310.
2 56719.
19041.
51644.
TREATMENT
INTEREST
731391.
AND PAINTENANCt CCST
AVERAGE
0 .
183807.
66030.
2 13r>1 .
3162.
TOT4L
14171 .
11459.
9498588.
704500.
1910S13.
TOT&L
1910818
TOTAL
0.
183807.
198C89.
256199 .
66405.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
P/\X IMUM
0.
1776168.
765435.
48SS65.
. 0.
116. 44.
4pr<. 1413.
164. 83.
M IN IMUM
0 .
1181?!? .
52 1362.
11 1485.
27668.
AVtRAGF
0.
14873112 .
643398.
256790 .
49087.
TOTAL
0.
5949211 .
1286796.
3851854.
785385.
OF TOT M C»PIT4L CCST FOR TREATMENT ($ 1000 I
*5* *6*
a. 681.
«. 0.
«. 235.
9. 2352.
0. 250.
* 7* * 8* * 9*
0 . 513. 7 .
0. 11. 0.
0. 145. 1.
0. 1744. 14.
0. 183. 2.
*10*
0.
0.
C.
0.
0.
S.D.
53<3.
629.
361598.
3373S.
77031.
S.D.
0.
0.
13969.
1 1004.
2523.
S.D.
0.
234107.
172590.
137254.
14493.
NUMBER
0.
L.
3.
12.
21.
NUMBER
0.
4.
2.
15.
16.
0.
0 .
0.
0.
0.
*12*
232.
0.
232.
232.
0.
*1*
#2*
C ISTKTBUTION OF ANN'JAL OEM TREATMENT CCSTS (t 1000)
*/t* **;* *6* *7* *s* *9*
*10*
*I1*
*12*
MAX
MIN
AVE
TOT
SD
6.
0.
4 .
1 1.
1 .
O.
1 .
in.
p.
r.
I?.
343.
36.
0.
11
7.
1.
1.
I.
1.
p.
56.
0.
17.
166.
21 .
0.
0 .
C.
0.
0.
13.
1 .
44.
4 .
2.
0.
0.
3.
1 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
8.
C.
8.
8.
0.
SO OR S.O. REPRESENTS S^NO^'D DFVl&TICN. THE CUT 4 DISTRIEUTICN UStC IS HIGHLY SKEWED.
-------
VERMONT
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 37
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
3000.
2945.
1380935.
183807.
346006.
MINIMUM
25.
7.
22134.
1006.
3957.
AVERAGE
383.
293.
243906.
17773.
48749.
TOTAL
14171.
10823.
9024518.
657589.
1803695.
S.D.
539.
629.
360652.
33615.
76817.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
657589.
151226.
694888.
TOTAL
1803701.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
to
CO
O5
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000,
MAX
MIN
AVE
TOT
SD
*1*
*2*
MAXIMUM
0.
183807.
79540.
39203.
9906.
MAXIMUM
0.
1726168.
765435.
457982.
87820.
MINIMUM
0.
183807.
51644.
11079.
1006.
AVERAGE
0.
183807.
66030.
20538.
3785.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
1181212. 1487302.
765435. 765435.
111485. 246187.
27668. 51365.
TOTAL
0.
183807.
198089.
184844.
90849.
TOTAL
0.
5949211.
765435.
3692806.
873205.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *u* *5* *6* *7* *8* *9*
19.
0.
1U.
43.
5.
62.
1.
9.
156.
15.
852.
0.
108.
3252.
162.
425.
0.
42.
1334.
33.
8.
8.
8.
8.
0.
681.
0.
227.
2273.
254.
0.
0.
0.
0.
0.
513.
11.
143.
1714.
184.
6.
0.
1 .
12.
2.
*10*
0.
0.
0.
0.
0.
S.D.
0.
0.
13969.
9775.
3002.
S.D.
0.
234107.
0.
119106.
16807.
NUMBER
0.
1.
3.
9.
24.
NUMBER
0.
4.
1 .
15.
17.
*11*
0.
0.
0.
0.
0.
*12*
232.
0.
232.
232.
0.
MAX
MIN
AVE
TOT
SD
*1*
3.
0.
2.
7.
1.
*2*
1.
0.
0.
9.
0.
*3*
148.
0.
11.
320.
27.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*i|* *5* *6* *7* *8* *9*
36.
0.
3.
107.
7.
1.
1.
1.
1.
0.
56.
0.
16.
160.
21,
0.
0.
0.
0.
0.
13.
1.
4.
43.
4.
1.
0.
0.
2.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
8.
0.
8.
8.
0.
SD
OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
VERMONT
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 37
CO
CO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAX
MIN
AVE
TOT
SD
MAXIMUM
3000.
2U17.
1380935.
154033.
294041.
O£M
561015.
MINIMUM
25.
7.
. 22134.
973.
3957.
ANNUAL COST OF WASTE
REPLACEMENT
405291.
DISTRIBUTION OF OPERATION
MAXIMUM
0.
154033.
79540.
40898.
9942.
MINIMUM
0.
154033.
52917.
10297.
973.
AVERAGE
383.
245.
219076.
15163.
42985.
TREATMENT
INTEREST
624148.
AND MAINTENANCE COST
AVERAGE
0.
154033.
66229.
20657.
3544.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
1726168.
985337.
393012.
96947.
MINIMUM
0.
1203813.
765435.
112327.
27668.
AVERAGE
0.
1436003.
875386.
223914.
52151.
TOTAL
14171.
901*9.
8105826.
561015.
1590448.
TOTAL
1590454.
TOTAL
0.
154033.
132457.
185916.
88609.
TOTAL
0.
4308011.
1750771.
3134800.
938714.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *u* *5* *6* *7* *8* *9*
19.
0.
13.
39.
6.
62.
1.
8.
144.
15.
753.
0.
96.
2881.
143.
350.
0.
35.
1119.
70.
8.
8.
8.
0.
681.
0.
209.
2094.
235.
0.
0.
0.
0.
0.
513.
11.
131.
57^.
169.
5.
0.
1.
11.
1.
*10*
0.
0.
0.
0.
0.
S.D.
539.
536.
327186.
28625.
67896.
S.D.
0.
0.
18826.
10192.
2632.
S.D.
0.
265959.
155500.
109370.
17756.
NUMBER
0.
1.
2.
9.
25.
NUMBER
0.
3.
2.
14.
18.
*11*
0.
0.
0.
0.
0.
*12*
232.
0.
232.
232.
0.
MAX
MIN
AVE
TOT
SD
*1*
3.
0.
2.
6.
1.
*2*
1.
0.
0.
9.
0.
*3*
124.
0.
9.
265.
23.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*i»* *5* *6* *7* *g* *9*
30.
0.
3.
90.
6.
1.
1.
1.
1.
0.
56.
0.
14.
142.
19.
0.
0.
0.
0.
0.
13.
1.
3.
39.
4.
1.
0.
0.
2.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
8.
8.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTil MIMBEP CF MANUFACTURING PLANTS,
VIRGINIA
FLOW 4T OBSERVtt 1968 LEVCL
1968 FLOW CONDITIONS ( 1967 DCLLARS)
266
MANUFACTURING FMPIOYMF.NT
FLOW (M^v)
TOTAL CAPITAL COST
TQT!VL 4NKU&L OGV COST
TPTrtL ANNUAL COST
MAXIMUM
9000.
646S7.
307602PH.
184360°.
5750 1£4.
MINIMUM
8.
3.
1728 I.
679.
287*.
AVERAGE
540.
907.
534854.
33559.
101483.
TOTAL
143731.
241258.
142271104.
8926715.
26994400.
S.O.
9*0.
5314.
2242362.
145536.
427887.
ANNUAL COST OF WASTE
CM REPLACEMENT
6926715. 7113554.
TREATMENT
INTEREST
10954869.
TOTAL
26995136.
CO
CO
00
COST RAMCF
> 50CCCC.
ICnoOO. TO
SCOOO. TT
10000. TO
0. TO
OISTRIBtTICN OF HPER4TICN »NC
500000.
100000.
^COOO.
10000.
COST
> 5000000.
1000000. TO 5CCOCOO.
500000. TP 1000000.
lOOOOO. TO 5CCOOO.
0. TO 1CCOOO.
*1*
*?*
MAXIMUM
1R436C9.
•*32842.
39357.
43723.
COST
"INIMUM
557865.
110132.
51216.
10062.
67?.
AVERAGE
1063544.
171754.
68230.
21388.
4416 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
38450352.
4469382.
912782.
492148.
98S78.
MINIMUM
5 U7148.
10-15446 .
537359.
101263.
21601.
AVERAGE
2143605.
689507.
213507.
64878.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 10CO)
*5*
*6*
*7*
*8*
TOTAL
4254179.
1545789.
1023447.
1326085.
777267.
TOTAL
89514512.
40728496.
10342599.
32453008.
4800968.
S .0.
570171.
67750.
11935.
9748.
2494.
S.D.
12229799.
890062.
U8335.
97091.
21801.
NUMBER
4.
9.
15.
62.
176.
NUMBER
6.
19.
15.
152.
74.
MAX
MfN
AVF
TOT
sn
505.
0.
100.
1197.
143.
542.
1 .
23 .
34°f- .
5R .
856.
0.
I 19.
1701S.
144.
11410.
0.
161 .
29349.
942.
87.
6.
23.
831 .
15.
3561.
0.
226.
34734.
5C6.
43.
0.
33.
298.
4.
55 If .
5.
183.
34646.
556.
9
0
3
144
2
*10*
C.
0.
0.
0.
0.
103C6.
0.
7591.
15182.
3840.
*12*
3056.
0.
1792.
5377.
1102.
*2*
*3*
DISTRIBUTICN OF ANNUAL CW TREATMENT CCSTS ($ 1000)
*5* *6* *7* *8*
"AX
MIN
4VE
TOT
SO
44.
0.
12.
140.
13.
6 .
0.
1.
104.
1.
lOfi.
0.
10.
1427.
17.
301.
0.
7.
1203.
2a.
54.
1.
9.
321.
10.
735
0
21
3164
78
2.
0.
1.
13.
3.
219.
0.
6 .
1094.
23.
2.
0.
1 .
26.
1.
*10*
0.
0.
0.
0.
0.
*ll*
867.
0.
634.
1267.
330.
*12*
95.
0.
56.
168.
34.
50 OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USiO IS HIGHLY SKEWED.
-------
VIRGINIA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 266
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
IV3 COST RANGE
CO > 5000000.
IB 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
280.
0.
73.
881.
89.
*2*
415.
1.
21.
3228.
51.
MAXIMUM
9000.
33938.
18957200.
1132681.
3540244.
O6M
7259247.
MINIMUM
8.
3.
16364.
679.
2874.
ANNUAL COST OF WASTE
REPLACEMENT
5977712.
DISTRIBUTION OF OPERATION
MAXIMUM
1132681.
246412.
89357.
46499.
9932.
MINIMUM
557865.
106175.
51216.
10456.
679.
AVERAGE
540.
664.
449452.
27290.
84369.
TREATMENT
INTEREST
9205673.
AND MAINTENANCE COST
AVERAGE
766960.
142459.
67987.
20714.
4257.
TOTAL
143731.
176494.
119554256.
7259247.
22442032.
TOTAL
22442624.
TOTAL
3067841.
1282129.
883834.
1263577.
761920.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
23696496.
4469382.
984544.
492148.
98978.
DISTRIBUTION
*3* *4*
685. 6041.
0. 0.
110. 116.
15744. 21038.
133. 560.
MINIMUM
6242367.
1048256.
502255.
101009.
20455.
AVERAGE
12545955.
2134733.
722330.
212918.
64835.
TOTAL
62729776.
40559936.
9390284.
31511824.
5251634.
OF TOTAL CAPITAL COST FOR TREATMENT <$ 1000)
*5* *6*
87. 2492.
5-. 0.
23. 204.
821. 31437.
15. 410.
*7* *8*
43. 3645.
0. 5.
33. 162.
298. 30554.
4. 422.
*9* *10*
9. 0.
0. 0.
3. 0.
133. 0.
2. 0.
S.D.
940.
3186.
1578880.
99901.
298788.
S.D.
254289.
43620.
12550.
9759.
2408.
S.D.
7288150.
902903.
136104.
96206.
21559.
NUMBER
4.
9.
13.
61.
179.
NUMBER
5.
19.
13.
148.
81.
*11*
6805.
0.
5840.
11681.
1364.
*12*
2125.
0.
1246.
3739.
766.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
30.
0.
10.
114.
9.
5.
0.
1.
99.
1.
97.
0.
9.
1271.
16.
168.
0.
5.
926.
18.
54.
1.
9.
317.
10.
432
0
16
2530
54
2.
0.
1.
13.
0.
118.
0.
5.
870.
14..
2.
0.
1.
23.
0.
*10*
0.
0.
0.
0.
0.
*11*
578.
0.
489.
979.
126.
*12*
66.
0.
39.
118.
24.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLV SKEWED.
-------
VIRGINIA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 266
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
9000.
25186.
15351113.
915302.
2861931.
MINIMUM
3.
11127.
679.
2512.
AVERAGE
5UO.
510.
395657.
23332.
73579.
TOTAL
113731.
113517.
105211701.
6206336.
19571888.
S.D.
9i»0.
2163.
1313813.
82046.
217581.
OEM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
6206336.
5262231.
8103838.
TOTAL
19572100.
to
!*>
o
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000,
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000,
0, TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
*2*
MAXIMUM
915302.
168983.
96793.
19722.
9932.
MAXIMUM
19189261.
H69382.
912782.
197712.
98525.
MINIMUM
503111.
110132.
50331.
10012.
679.
AVERAGE
683819.
198161.
70109.
20136.
1012.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
6918902.
1100992.
551951.
101823.
17658.
AVERAGE
11777118.
2223123.
725850.
211186.
63157.
TOTAL
2051158.
1190781.
1051633.
1161832.
717681.
TOTAL
17109792.
10021616.
8710203.
30030992.
5681171.
221.
0.
60.
716.
71.
288.
1.
19.
2911.
11.
628.
0.
99.
11200.
120.
1555
0
93
16953
133
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT <$ 1000)
*3* *1* *5* *6* *7* *8* *9*
9.
0.
3.
121.
2.
87.
1.
22.
787.
15.
2126.
0.
187.
28817.
360.
11.
0.
32.
285.
1.
3032
5
116
27671
361
*10*
0.
0.
0.
0.
0.
S.D.
210613.
133825.
16763.
10178.
2338.
S.D.
5917122.
978265.
122102.
100668,
21761.
NUMBER
3.
6.
15.
57.
185.
NUMBER
1.
18.
12.
112.
90.
*11*
5660.
0.
1968.
9935.
978.
*12*
1597.
0.
93~>.
2811.
576.
MAX
MIN
AVE
TOT
SD
*1*
22.
0.
8.
96.
8.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*(4* *5* *6* *7* *8* *9*
3.
0.
1.
91.
1.
97.
0.
8.
1085.
13.
130.
0.
1.
767.
11.
51.
0.
8.
295.
10.
312
0
11
2157
11
2.
0.
1.
12.
0.
90.
0.
1.
756.
11.
2.
0.
0.
21.
0.
*10*
0.
0.
0.
0.
0.
*11*
183.
0.
118.
835.
92.
*12*
50.
0.
30.
90.
18.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
hASHINGKN
FLOW AT OBSERVED IS68 LEVEL
1968 FLOW CONDITIONS I 1967 DOLLARS)
19C
MANUFACTURING EMPICYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL C16M COST
TOTHL SNNUM COST
MAXIMUM
31000.
105627.
529C7440.
3956620.
10675E63.
MINIMUM
18.
6.
22206.
1444.
4264.
AVERAGE
674.
3048.
1785617.
139195.
365972.
TOTAL
127980.
579112.
339267328.
26447056.
69534688.
S.O.
2483.
13015.
5930570.
478067.
1218982.
OCM
4NNUU COST OF W«STE TREATMENT
REPLACEMENT INTEREST
26447056.
16963360.
26123568.
TOTAL
69533984.
CO
COST
> 500000.
loccon. TO
50000. TO
inooo. TT
0. TP
^00000.
100000.
50000.
1COOO.
COST RANGE
> 5000000.
ICOCOTC. TO 5COOOOO.
5000 CO. TO 1CCCOOO.
100000. TO 500000.
C. TP ICOOOO.
MAX
MIN
AVE
TOT
SO
953.
0.
214.
1926.
?99.
*2*
1.
30,
2682 .
395662C.
45228?.
97S56.
49150.
9791 .
DISTRIBUTION OF HPERATICN AND MAINTENANCE CCST
MINIMUM AVERAGE
53695-S. 1757822.
101703. 204056.
5311?. 66379.
10060. 25530.
1444. 4971 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
43^3176.
999361.
4<37758.
98016.
MINI -1UM
5U667C.
1052527.
512059.
104123.
?7758.
JVER4GE
21576544 .
2119^75.
745751 .
272397.
IS9904.
TOTAL
17578224.
5101401.
1062064.
2501966.
203813.
TOT4L
302071808.
43578256.
35796064.
21246960.
1398084.
niSTRIBUTION OF THTAL CAPITAL CCST FOR TREATMENT {$ 1000)
*7* *8* *9*
S.O.
1269770.
106967.
12423.
11867.
2245.
S.O.
18835584.
1085315.
145843.
121072.
23768.
NUMBER
10.
25.
16.
98.
NUMBER
14.
30.
48.
78.
20.
*10*
*U*
1763.
0.
?4P .
L7605 .
32".
2 1333.
0.
753.
3 5806.
2920.
44.
6.
26.
339.
12.
61CI
J
5E6
649^5
1021
*12*
45.
0.
45.
45.
0.
8930.
18.
500.
69967.
1271.
18.
0.
5.
125.
4.
11110.
0.
9051 .
36206.
2699.
16679.
0.
102 15.
51077.
5336.
2657.
0.
1417.
8501.
736.
M4X
AVE
TOT
SO
OISTRIBUTICN flf 4NWJ »L C£C TRMTMEKT COSTS 1$ 1000)
* ? * * 8* * 9*
I*
"^ ^
r\
3?.
H * •
4
-------
WASHINGTON
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 190
to
UN
DO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O£M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
373.
0.
149.
134" .
1
-------
WASHINGTON
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 190
to
rf>
CO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
371.
0.
135.
1211.
119.
*2*
134.
1.
18.
1598.
25.
MAXIMUM
31000.
33981.
22402384.
1668232.
4513334.
OSM
11430643.
MINIMUM
18.
3.
16220.
1026.
3086.
ANNUAL COST OF WASTE
REPLACEMENT
7994188.
AVERAGE
674.
1018.
841494.
60161.
167029.
TREATMENT
INTEREST
12311044.
TOTAL
127980.
193485.
159883776.
11430643.
31735488.
TOTAL
31735856
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
1668232.
468091.
89950.
42377.
9821.
MINIMUM
560223.
104978.
54429.
10020.
1026.
AVERAGE
1011620.
175430.
72085.
19287.
5332.
TOTAL
6069722.
2806887.
720854.
1369343.
463870.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
28002976.
4385741.
933277.
482804.
98961.
DISTRIBUTION
*3* *i»*
785. 7141.
0. 0.
144. 250.
10189. 28488.
175. 954.
MINIMUM
5409001 .
1041746.
530933.
100429.
20275.
OF TOTAL CAPITAL COST
*5* *6*
41. 3256.
6. 0.
19. 322.
246. 35791.
9. 543.
AVERAGE
118736U3.
2003867.
682732.
256171.
60682.
FOR TREATMENT ($ 1000)
*7* *8*
33. 4307.
0. 11.
33. 249.
33. 34857.
0. 611.
TOTAL
118736432.
40077344.
12289182.
26385616.
2366597.
*9* *10*
9. 4380.
0. 0.
3. 3569,
73. 14275.
2. 1064.
S.D.
2483.
14185.
2536706.
197326.
516074.
S.D.
492617.
86751.
12496.
8542.
2743.
S.D.
8093721.
860309.
127343.
106878.
21708.
NUMBER
6.
16.
10.
71.
87.
NUMBER
10.
20.
18.
103.
39.
*11*
8040.
0.
4924.
24622.
2572.
*12*
2657.
0.
1417.
8501.
736.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
54.
0.
23.
208.
19.
5.
0.
1.
85.
1.
171.
0.
20.
1400.
35.
248.
0.
13.
1518.
37.
31.
1.
7.
91.
8.
740
0
34
3812
94
2.
0.
2.
2.
0.
185.
1.
9.
1290.
26.
3.
0.
1.
16.
1.
*10*
*12*
8.
0.
7.
28.
2.
851.
0.
526.
2631.
269.
108.
0.
58.
349.
29.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOT4L NUMBER OF M»NUF4CTUR ING PUNTS...
WEST VIRGIM&
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
101
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTM C4PIT&1. COST
TOTAL ANNUAL OEM COST
TOTAL AMNUAL COST
MAXIMUM
12000.
29431.
2197657t.
2219551.
5310575.
MINIMUM
33.
7.
21651.
1055.
3805.
AVERAGE
654.
717.
699144.
56893.
145684.
TOTAL
66101.
72393.
70613552.
5746163.
14714131.
S.D.
1291.
3033.
2448159.
226897.
529392.
O&M
5746163.
ANNUAL COST OF hASTE TREATMENT
REPLACEMENT INTEREST
3530677.
543724C.
TOTAL
14714080.
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
CO
CPST RANGE
> 500000.
100000.
50000.
10000.
C.
Tn
TH
TP
TC
500000.
100000.
50000.
looor.
COST RAN'GF
lOOOOO'O. TO 50COOOO.
•5000 CO. TO ICOOOOO.
100000. TO 500000.
o. TO loooor.
*2*
MAXIMUM
2215561.
420341.
96491.
45265.
97 39 .
MAXIMUM
2747C720.
344C967.
965007.
497428.
96512.
MINIMUM
2219551.
52112.
10170.
1055.
AVERAGE
2219551.
222645.
71088.
22500.
5257.
DISTRIBUTION OF INVESTMENT PECUIREMENTS
MINIMUM
13938733.
101S651.
508328.
101610.
27064.
AVERAGE
20704720.
1845292.
682580.
203173.
62012.
TOTAL
2219551.
1781162.
710882.
787506.
247C92.
TOTAL
41409440.
27679392.
6825802.
11174527.
U78237.
OISTRiatmCN OF TOTAL C4PITU CCST FCR TREATMENT (t 1000)
*4* *5* *t* *7* *8* *5*
MAX
MIN
4VE
TOT
SO
11566.
".
1121.
ISftap.
35fl7.
917.
1 .
47.
2997 .
121 .
35 If .
0.
213.
18111.
417.
2541.
0.
89.
7854.
323.
84.
LI.
36.
325.
29.
746
0
138
5500
168
*10*
0.
0.
0.
0.
0.
1037.
9.
179.
8049.
223.
4.
1.
.2.
43.
1.
9637.
0.
9637.
9637.
C.
S.D.
0.
104319.
14067.
11291.
2703.
S.D.
9568579.
644551.
145749.
105791.
21175.
NUMBER
1.
a.
10.
35.
47.
NUHBER
2.
15.
10.
55.
19.
*11*
0.
0.
0.
0.
0.
*12*
L127.
0.
800.
2399.
405.
MAX
MIN
AVF
TOT
SO
*1*
480.
0.
-------
WEST VIRGINIA
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 101
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
12000.
29431.
21976576.
2219551.
5010575.
MINIMUM
33.
7.
21651.
1055.
3805.
AVERAGE
654.
709.
691601.
56072.
143906.
TOTAL
66101.
71566.
69851984.
5663260.
14534515.
S.D.
1291.
3035.
2449932.
227060.
529790.
06M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
5663260.
3492598.
5378600.
TOTAL
14534458.
CO
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
2219551. 2219551. 2219551.
420341. 105311. 222645.
96491. 52112. 7104U.
49265. 10170. 23162.
9739. 1055. 4948.
MAXIMUM
27470720.
3440967.
965007.
497428.
99938.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
13938733.
1019651.
508328.
102873.
.27064.
AVERAGE
20704720.
1845292.
682197.
206608.
67883.
TOTAL
2219551.
1781162.
710439.
694848.
257290.
TOTAL
41409440.
27679392.
6821965.
9503957.
1900727.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* #5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
13566,
0.
1121.
15698.
3587.
917.
1.
46.
2931.
121.
3516.
0.
207.
17632.
419.
2941
0
88
7735
323
84.
11.
36.
325.
29.
746.
0.
136.
5436.
169.
0.
0.
0.
0.
0.
1037.
9.
178.
8027.
223.
3.
1.
2.
32.
1.
*10*
9637.
0.
9637.
9637.
0.
S.D.
0.
104319.
14106.
11907.
2487.
S.D.
9568579.
644551.
145768.
111385.
21117.
NUMBER
1.
8.
10.
30.
52.
NUMBER
2.
15.
10.
46.
28.
*11*
0.
0.
0.
0.
0.
*12*
1127.
0.
800.
2399.
405.
MAX
MIN
AVE
TOT
SD
*1*
480.
0.
58.
812.
125.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*U* *5* *6* *7* *8* *9*
22.
0.
1.
93.
3.
1398.
0.
38.
3204.
156.
261.
0.
8.
685.
29.
61
2
19
172
23
57.
0.
8.
334.
13.
0.
0.
0.
0.
0.
58.
1.
6.
249.
9.
1.
0.
0.
6.
0.
*10*
14.
0.
14.
14.
0.
*11*
0.
0.
0.
0.
0.
*12*
44.
0.
32.
95.
16.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WEST VIRGINIA
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
momRT , 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 101
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
12000.
20497.
137191141.
1612738.
3355068.
MINIMUM
33.
7.
21651.
- 1055.
3805.
AVERAGE
654.
568.
56U322.
46208.
117878.
TOTAL
66101.
57371.
56996512.
4667021.
11905632.
S.D.
1291.
2144.
1647589.
165S84.
365826.
OSM
4667021.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
2849825.
4388729.
TOTAL
11905575.
CO
*>
05
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
1612738.
307027.
89474.
49265.
9739.
MAXIMUM
17148912.
2513706.
965007.
497428.
99165.
MINIMUM
1612738.
105311.
52112.
10170.
1055.
AVERAGE
1612738.
184927.
69803.
23945.
4672.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
11271961.
1019651.
508328.
100162.
27064.
AVERAGE
14210432.
1687390.
665941.
210357.
67586.
TOTAL
1612738.
1479419.
628231.
694391.
252270.
TOTAL
28420864.
25310864.
6659405.
8624655.
2230323.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *M* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
7354.
0.
640.
8959.
1936.
700.
1.
40.
2544.
94.
2784.
0.
187.
15911.
340.
2059.
0.
72.
6323.
230.
84.
11.
36.
325.
29.
709
0
132
5263
163
0.
0.
0.
0.
0.
821.
9.
168.
7559.
202.
3.
1.
1.
27.
1.
*10*
7735.
0.
7735.
7735.
0.
S.D.
0.
63980.
12277.
12553.
2364.
S.D.
4155630.
492363.
155071.
115722.
20332.
NUKBER
1.
8.
9.
29.
54.
NUMBER
2.
15.
10.
41.
33.
*11*
0.
0.
0.
0.
0.
*12*
1105.
0.
784.
2351.
397.
MAX
MIN
AVE
TOT
SD
*1*
356.
0.
45.
628.
92.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
17.
0.
1.
83.
2.
1008.
0.
30.
2576.
113.
189.
0.
6.
560.
21.
61.
2.
19.
172.
23.
49
0
8
315
12
0.
0.
0.
0.
0.
43.
1.
5.
224.
7.
1.
0.
0.
5.
0.
*10*
12.
0.
12.
12.
0.
*11*
0.
0.
0.
0.
0.
*12*
43.
0.
31.
93.
15.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMRFR OF MANUFACTURING PLANTS...
WISCONS IN
FLOW U OBSERVE! 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 OCLLARS)
485
MANUFACTURING EMPLOYMENT
FLOW "icooon.
100000. TO
^0000. TP
10000. TO
0. TO
DISTRIBITION OF npERATICI> AND MAINTENANCE CCST
5COC30.
I 00000.
5COOO.
10000.
CPST P/SNGE
> 5CCCCOC.
1000000. TO 50CCOOO.
500000. TP 1000000.
IOOCCO. TO 5COOOO.
0. TO 100010.
*1*
*2*
MAXIMUM
052697.
476720.
48149.
49615.
9965.
MAXIMUM
17482144.
4322467.
987919.
4176 13.
9S842.
M IN IM UM
648345,
1124(3.
5C92C.
100 30 .
666.
AVERAGE
800521.
195343. "**»
73634.
20071.
4755.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
6561512 .
1012275.
513529.
100093.
13835.
AVERAGE
10<46068.
2092140.
644725.
218738.
63644,
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT <$ 1000)
TOTAL
1601C41.
6837021.
1914488.
3131051.
1264906.
TGT AL
42584272.
115067712.
24315376.
54465680.
9037442.
S.O.
215211.
88214.
13285.
9530.
2637.
S.D.
5102531.
927800.
156366.
96655.
2C630.
NUMBER
2.
35.
26.
156.
266.
NUMBER
4.
55.
35.
249.
142.
*•>*
*5*
*6*
MAX
MIN
AVE
TOT
SO
895.
C.
192.
1920.
258.
256.
1 .
20 .
5830.
30 .
1180.
0.
10C' .
3C?77.
142.
3834.
0.
99.
27598.
2S9.
87.
7.
29.
774.
24.
2024
C
273
59588
345
*7*
34.
0.
34.
34.
0.
*8*
2836.
8 .
175.
54156.
311.
*9*
43.
0.
4.
518.
5.
*10*
o.
o.
0.
c.
0.
*ll*
52S3.
0.
3350.
134CO.
1460.
*12*
1415.
0.
1140.
2279.
389.
MAX
MIN
4VF
TGT
SO
*2*
DISTRIBUTION OF ANNUAL C£M IPEATPEIVT CCSTS (t 1000 >
*4* *5* *fc* *7*
114.
C.
?8 .
274.
33.
7 .
n.
1 .
?74.
1.
288 .
0.
11.
3 1 35 ,
25.
129.
0 .
7.
mi.
13.
8?.
1 .
14.
38?.
20.
i 16
0
25
5475
44
2.
0.
?.'.
2.
0.
89.
1 .
6.
1724.
10.
17.
0.
1 .
140.
2.
*1C*
0.
C.
0.
0.
c.
*11*
520.
0.
335.
1340.
142.
*12*
54.
0.
43.
87.
14.
SO OR S.P. PEPRFSFNTS STANDARD DEVIATION. THE DATA CISTRIBUTICN USED IS HIGHLY SKEWED.
-------
WISCONSIN
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
m™,»T „„„ 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 485
to
*>
CO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
379.
0.
119.
1186.
107.
*2*
190.
1.
17.
4818.
25.
MAXIMUM
10300.
1872U.
13985725.
952697.
2728882.
OEM
13244483.
MINIMUM
6.
2.
10037.
608.
1883.
ANNUAL COST OF WASTE
REPLACEMENT
9184534.
AVERAGE
511.
459.
378744.
27308.
75405.
TREATMENT
INTEREST
14144177.
TOTAL
247779.
222782.
183690704.
13244483.
36571536.
TOTAL
36573184.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
952697,
371124.
98053.
09615.
9954.
MINIMUM
648345.
104051.
50920.
10029.
608.
AVERAGE
800521.
190358.
72924.
19534.
4596.
TOTAL
1601041.
5901107.
1823094.
2559012.
1360295.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
17482114.
4322467.
987918.
497849.
99842.
DISTRIBUTION
*3* *4*
789. 3834.
0. 0.
91. 91.
25380. 25426.
116. 298.
MINIMUM
6561512.
1012275.
513274.
100093.
12546.
OF TOTAL CAPITAL COST
*5* *6*
79. 2024.
7. 0.
27. 264.
733. 57443.
22. 349.
AVERAGE
10646068.
2086742.
683727.
204142.
62163.
FOR TREATMENT ($ 1000)
*7* *8*
34. 2836.
0. 8.
34. 170.
34. 52672.
0. 310.
TOTAL
42584272.
106423856.
22562976.
47973312.
10070387.
*9* *10*
35. 0.
0. 0.
3. 0.
425. 0.
4. 0.
S.D.
916.
1449.
972525.
71669.
194409.
S.D.
215211.
79424.
12954.
9688.
2532.
S.D.
5102531.
913451.
158633.
93522.
20360.
NUMBER
2.
31.
25.
131.
296.
NUMBER
4.
51.
33.
235.
162.
*11*
5293.
0.
3350.
13400.
1460.
*12*
1348.
0.
1086.
2172.
371.
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
KIN
AVE
TOT
SD
66.
0.
20.
197.
18.
5.
0.
1.
242.
1.
161.
0.
8.
2292.
16.
129.
0.
6.
1678.
12.
64.
1.
13.
340.
17.
216
0
24
5289
44
2.
0.
2.
2.
0.
89.
1.
5.
1676.
10.
13.
0.
1.
106.
1.
*10*
0.
0.
0.
0.
0.
*11*
520.
0.
335.
1340.
142.
*12*
51.
0.
41.
83.
14.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WISCONSIN
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 485
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O8M COST
TOTAL ANNUAL COST
MAXIMUM
10300.
18724.
13985725.
952697.
2728882.
MINIMUM
6.
1.
8081.
506.
1532.
AVERAGE
511.
U28.
352597.
24943.
69719.
TOTAL
247779.
207U57.
171009392.
12097135.
33813712.
S.D.
916.
1442.
967<43'«.
70669.
192957.
06M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
12097135.
8550469.
13167716.
TOTAL
33815312.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
tO COST RANGE
«N > 5000000.
CO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
952697. 61*8345. 800521.
371124. 104051. 203704.
98053. 52040. 73155.
49615. 10076. 19919.
9769. 506. 4359.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE
17482144. 6561512. 10646068.
4322467. 1001477. 2079160.
955281. 515357. 708038.
49641*2. 100058. 202933.
99842. 10101. 60305.
TOTAL
1601041.
5092591.
1902039.
2071622.
1429906.
TOTAL
42584272.
97720560.
17700960.
44239360.
11518225.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
243.
0.
69.
687.
67.
190.
0.
14.
3923.
22.
769.
0.
78.
21656.
102.
3834
0
86
23995
298
66.
5.
22.
594.
15.
2024.
0.
253.
55108.
352.
31.
0.
31.
31.
0.
2836.
5.
161.
49634.
307.
28.
0.
3.
349.
3.
*10*
0.
0.
0.
0.
0.
S.D.
215211.
79034.
12871.
10294.
2486.
S.D.
5102531.
958093.
162152.
102281.
21740.
NUMBER
2.
25.
26.
104.
328.
NUMBER
4.
47.
25.
218.
191.
*11*
5293.
0.
3350.
13400.
1460.
*12*
1013.
0.
816.
1633.
279.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
49.
0.
13.
133.
14.
4.
0.
1.
216.
0.
117.
0.
6.
1797.
12.
129.
0.
5.
1540.
12.
49.
1.
8.
223.
11.
216.
0.
23.
5114.
45.
1.
0.
1.
1.
0.
89.
0.
5.
1589.
10.
10.
0.
1.
81.
1.
*10*
0.
0.
0.
0.
0.
*11*
520.
0.
335.
1340.
142.
*12*
39.
0.
31.
63.
10.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOT At NUM"FR C.F MANUFACTURING PI ANTS...
FLOW
1968 FLOW
1 1
fcYCP ING
AT OBSERVED 1C68 LEVEL
COKOITICNS ( 1967 DCLl. APS)
MANUFACTUHIfVC; EMPLOY fFM
FLPW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM CflST
TOTAL ANNUAL COST
550.
1687.
4146533.
?4fl6l5.
7152?5.
MINIMUM
5C.
1 8.
3R574.
2084.
6983.
AVERAGE
201.
764.
1507139.
99358.
290765.
TOTAL
2213.
8407.
16578539.
1092939.
3198413.
S.O.
161.
572.
1444122.
83594.
265062.
OEM
10S2939.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
826927.
1276546.
TOTAL
3198411.
CO
W
O
COST R4NGC
> 500000.
1C 0000. TP
50000. TH
TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
5CCOOC.
100000.
50000.
10000.
COST RANGE
> 5000000.
icooono. TO 5CCCOOO.
'OOOCO. TO 10COOOO.
100000. TC 500000.
0. TO 1COOOO.
MAXIMUM
0.
248615.
97825.
25272.
2084.
MAXIMUM
5183166.
4462691.
85686C.
247544.
48217.
MINIMUM
0.
115825.
51822.
14345.
2084 .
AVERAGE
0.
191402.
71408.
19808.
2084.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5183166.
1126567.
856860.
130532.
48217.
AVERAGE
5183166.
2376139.
856860.
189048.
48217.
TOTAL
0.
765609.
285631.
39617.
2084.
TOTAL
5183166..
14256834.
856860.
378096.
48217.
MAX
MIN
AVF
TOT
SO
522.
0.
347.
1389.
167.
110.
0.
63.
507.
34.
526 .
22.
?59.
2070.
178.
181
0
86
861
64
CISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000),
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
18.
0.
18.
18.
0.
565.
0.
533.
1600.
55.
26.
0.
26.
26.
0.
269.
16.
193.
772.
120.
*10*
0.
0.
0.
0.
0.
S.D.
0.
56518.
19190.
7727.
0.
S.O.
0.
1419181.
0.
82754.
0.
NUMBER
0.
4.
4.
2.
1.
NUMBER
1.
6.
I.
2.
1.
*11*
0.
0.
0.
0.
0.
*12*
3088.
0.
2334.
9335.
794.
*2*
OISTRIBUTICN OF MM »L GSM TPE«TMENT COSTS ($ 1000)
#5* *fc* *7* *8* *9*
MAX
MIN
AVE
TCT
SO
61 .
0.
45.
181 .
16.
3.
0.
2.
15.
0.
90.
I .
34.
271.
32 .
15.
0.
7.
70.
4.
8.
0.
8.
8.
0.
47.
0.
44.
131.
7.
1.
0.
1.
1 .
0.
7.
I.
5.
20.
3.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*H*
0.
0.
0.
0.
0.
M2*
130.
0.
99.
395.
33.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WYOMING
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 11
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
550.
1218.
3165571.
191462.
593489.
MINIMUM
50.
18.
3857H.
2084.
6983.
AVERAGE
201.
555.
1172925.
76581.
225542.
TOTAL
2213.
6106.
12902178.
842387.
2480961.
S.D.
161.
392.
1094067.
63422.
201181.
06M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
842387.
645109.
993467.
TOTAL
2480962.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
tO COST RANGE
cn > soooooo.
H-* 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*2*
MAXIMUM
0.
191462.
80550.
39823.
2084.
MAXIMUM
0.
3956963.
909220.
247564.
48217.
MINIMUM
0.
143277.
52147.
14345.
2084.
AVERAGE
0.
166845.
65082.
26430.
2084.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1132325.
645091.
130532.
48217.
AVERAGE
0.
2357849.
777156.
189048.
48217.
TOTAL
0.
500536.
260328.
79439.
2084.
TOTAL
0,
14147097.
1554311.
378096.
48217.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *«* *5* *6* *7* *8* *9*
343.
0.
232.
927.
107.
86.
0.
49.
395.
26.
407.
22.
214.
1714.
136.
131.
0.
63.
627.
44.
18.
0.
18.
18.
0.
471.
0.
445.
1334.
46.
26.
0.
26.
26.
0.
218.
16.
157.
628.
96.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
0.
24109.
15078.
12782.
0.
S.D.
0.
1238422.
186770.
82754.
0.
NUMBER
0.
3.
4.
3.
1.
NUMBER
0.
6.
2.
2.
1.
*11*
0.
0.
0.
0.
0.
*12*
2393.
0.
1808.
7233.
615.
MAX
MIN
AVE
TOT
SD
*1*
46.
0.
35.
138.
12.
*2*
2.
0.
2.
13.
0.
*3*
69.
1.
26.
204.
22.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
10.
0.
5.
53.
3.
8.
0.
8.
8.
0.
36.
0.
33.
100.
5.
1.
0.
1.
1.
0.
6.
1.
4.
17.
2.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
101.
0.
77.
308.
26.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WYOMING
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
m~r,,>r „,, 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 11
CO
VI
to
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAX
MIN
AVE
TOT
SD
MAXIMUM
550.
847,
2354689.
143034.
442080.
O6M
603287.
MINIMUM
50.
14.
33203.
1773.
5990.
ANNUAL COST OF WASTE
REPLACEMENT
481506.
DISTRIBUTION OF OPERATION
MAXIMUM
0.
143034.
56521,
38585.
1773.
MINIMUM
0.
107109.
56521.
14345.
1773.
AVERAGE
201.
359.
875465.
54844.
166028.
TREATMENT
INTEREST
741518.
AND MAINTENANCE COST
AVERAGE
C.
124682.
56521.
28492.
1773.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
, 0.
2943361.
886185.
306377.
M503.
MINIMUM
0.
1175411.
713410.
130532.
41503.
AVERAGE
0.
2217832.
828593.
213009.
41503.
TOTAL
2213.
3950.
9630112.
603287.
1826311.
TOTAL
1826311.
TOTAL
0.
374045.
56521.
170949.
1773.
TOTAL
0.
8871331.
2485779.
639027.
41503.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6* *7* *8* *9*
220.
0.
151.
605.
67.
65.
0.
36.
291.
21.
268.
19.
158.
1267.
89.
90.
0.
41.
409.
30.
18.
0.
18.
18.
0.
383.
0.
361.
1083.
38.
26.
0.
26.
26.
0.
171.
14.
124.
494.
75.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
161.
250.
818099.
47704.
151329.
S.D.
0.
17976.
0.
9930.
0.
S.D.
0.
757745.
99755.
88427.
0.
*11*
0.
0.
0.
0.
0.
NUMBER
0.
3.
1.
6.
1.
NUMBER
0.
4.
3.
3.
1.
*12*
1799.
0.
1359.
5436.
462.
MAX
MIN
AVE
TOT
SD
*1*
34.
0.
26-
103,
9.
*2*
2.
0.
1.
11.
0.
*3*
27.
1.
16.
126.
10.
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*«* *5* *6* *7* *8* *9*
6.
0.
4.
35.
2.
8.
0.
8.
8.
0.
27.
0,
24.
73.
4.
1.
0.
1.
1.
0.
4.
1.
3.
13.
2.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
77.
0.
58.
234.
19.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION OSED IS HIGHLY SKEWED.
-------
NATIONAL SUMMARIES _..
BY SPECIFIC
STANDARD INDUSTRIAL CLASSIFICATION
253
-------
SIC Tables
Each table presents treatment costs for the specific SIC code number which
appears at the upper left of the table. All information is at the most
aggregated level of detail compatible with (1) industry integrity at the
2-digit SIC level, and (2) significant waste treatment considerations
associated with the industry. As a result, some three and four-digit
tables are presented. All information presented represents a total for
establishments using 10 million gallons or more of water at that level of
detail. There are five sets of tables. In each set the treatment costs
were calculated using different water use per employee data.
The first set of tables uses unit water use efficiency as reported for
1968. The second set places the least efficient region's water use value
equal to the next least efficient and calculates the costs. The third set
reflects the use of median or higher water use efficiency, that is, in
each SIC group all regional values below efficiency of the median region
are calculated as equal to the median. The fourth presents costs for each
SIC group with all regional efficiencies below the most efficient third
made equal to the most efficient third. The fifth presents costs for
each SIC group at a level equal to that for the most efficient water using
region for the group.
254
-------
sic cooe... io
TQT4L NUMBER OF H4NUF4CTURING PUNTS..,
* NATIONAL TOTALS *
FLOW 4T OBSERVED 1968 LEVEL
196B FkfiW CONDITIONS « 1967 DGLLARS1
4494
MANUFACTURING EMPLOYMENT
FLOW (HGY)
TOTAL CSPITAL COST
TOTAL ANNUAL OEM COST
THTAL ANNUAL COST
MAXIMUM
5500.
81468.
3 500000.
100000. T(<
50000. TO
10000. TO
0. TC
COST RANGE
> 5000000.
1 00 0000. TO
50COOO. TO
t ooooo. Tr
0. TO
500000.
100000.
50000.
10000.
5000000.
I 000000.
500000.
100000.
MAX
WIN
WE
TOT
SO
*l*
P.
0.
0.
0.
c.
*2*
4064 ,
0.
25.
65416.
tOf .
DISTRIBUTION OF OPERATION AND
ffiXIMIIM JpE MINIMUM
3125120. '**•-* 509^59.
417336. 103672.
99476. 50012.
49174. 10004.
9997. 66V.
MAINTENANCE CCST
WbRAGE
96f>7ll .
181067.
63576 .
1962S .
421 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
4«7768CO.
4843651.
999361.
409217.
99979.
MINIMUM
5560183 .
1005192.
503597 .
10 0093 .
21075.
AVERft&E
11727417,
1851542.
673671,
211908,
64100.
DISTRIBUTION OF TOTM C4PITAL CCST FCR TREATMENT (i 100<")
275. 21509.
r. o,.
34. 12fl.
92»37.
881.
*5*
87.
8.
20.
14227.
13.
*6*
82C9.
402 ? 87.
?86.
*7*
P-
ff.
(I .
0.
0.
*8*
6C39.
5.
84 .
377M71 .
156.
TOTAL
7733691.
11139765.
6514681.
19117904.
14150137.
T01 AL
164133840.
292543744.
183238464.
498106716.
L03906496.
43.
I.
1 .
3787.
5.
*10*
0.
c.
" .
0.
0.
S.O.
885569.
77092.
14182.
9428.
2384.
S.D.
11387870.
890294.
138983.
99556.
21274.
NUMBER
a.
56.
95.
974.
3361 .
NUMBER
14.
158.
*11*
0.
0.
0 •
2351.
1699.
*12*
0.
0.
0.
0.
0.
MAX
MIN
4VE
TOT
SO
*1*
c.
p.
0.
c.
r.
50.
C.
I .
2237.
1 .
DISTRIBUTION OF AWJ AL U£« TREATMENT COSTS (S 1000)
*3* *4* *5* *6* *7* *8*
37.
C.
2368.
3.
695.
0.
6.
30.
8?.
1.
6.
4597.
2045.
P.
12.
30/5 .
0.
0.
0.
0.
0.
335.
0.
3.
12173.
6.
IT.
O .
L .
797.
2.
*in*
o.
o.
o.
0.
n.
* 11*
n.
o.
o.
o.
0 .
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STfcNtURf) DEVIATION. THE DAT* DISTRIBUTION USED r HIGHLY SKEWED.
-------
SIC CODE...
TOTM NUMBER
201
OF M4NUFIVCTDR ING PL4NTS...
* NATIONAL TOTALS *
FLOW RT OBSfcRVEC 196C I EVEI.
1968 FLOW CONDITIONS ( 1967 noLIARSI
729
MANUFACTURING EMPIOYHF.NT
Fl OW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAl OC" COST
TOTAL ANNUAl COST
MAXIMUM
4000.
3 134.
1193329.
136277.
287830.
5C.
18.
45186.
2321.
R21 4.
IWEP4GE
278.
172.
1572C-6.
11'+7 7.
31448.
TGUL
20?517.
I 25Q4Q.
114647104.
8166908.
22925920.
S.U.
427.
313.
135301.
14HO.
31184.
OSM
ANNUAL COST TF WASTE TREATMENT
REPUCEMENT INTERFST
8J66908.
5732354.
8827822.
TOT4L
22927072.
OISTRIHUTION <3f 1PERATION AKD MAINTENANCE CCST
to
v\
en
COST RANGE
> 500000.
100000. TO
50000. T<^
10000. rn
0. TO
COST RANGE
> 5000000.
I 000000. TO
50000C. TO
100000. TO
0. TO
500000
t 00000
50000
IOOOP
5000000
t 000000
5COOOO
100000
CAXIMUM
136277.
94934.
49121.
9949.
MAXIMUM
0.
1491661.
894929.
496868.
99979.
M IN IMUM
0 .
108663.
64888.
1C.
4592.
9.
0.
0.
c.
0.
0.
0.
0.
0.
0.
34.
I .
3.
2477.
3 .
17.
C.
t .
797.
2.
*10*
0.
0.
0.
0.
0.
*H*
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
Sf> OR S.O. REPRESENTS ST»ND»RD DEVIiTION. THE O»T4 DISTRIBUTION USEC IS HIGHLY SKFWED.
-------
SfC CPDF... 20?
TOTAL NUMBER HF MANUFACTURING PL UNITS...
* NATIONAL TOTALS *
FLOW IVT OBSERVFC ]<»68 LEVEt
196fl FLOW CONDITICMS ( 1967 DOLLARS)
1 IB?
M 500000.
100000. TO
50000. TO
I 0000. TO
0. TC
CHST RANGE
> 50COOOC.
1000000. TO
500000. TO
inoooo. TO
o . TH
500000
I 00000,
50000
10000
5000000
1000000
500QOC
1000 on
MAXIMUM
0.
0.
n.
46887.
MAXIMUM
0.
0.
638323.
472044.
MINIMUf
0.
0.
o .
1040->.
679.
AVERAGE
0 .
0.
0.
16937.
2795.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
AVERAGE
547? 13.
100265.
21075.
0.
0.
585227.
150158.
55012 .
TOTAL
0.
0.
0.
558908.
321 1196.
TOTAL
o.
o.
1755680.
34986720.
52041456.
S.O.
0.
0.
0.
8701.
1779.
S.D.
0.
0.
47393.
56757.
19837.
NUMBER
0.
0.
0.
33.
1149.
fr
NUM BER
0.
0.
3.
233.
946.
DISTRIBUTION OF TOT M. CiiPITDiL CCST FOR TREATMENT
-------
SIC CODF... 203
TPTAL NUMBER OF MANUFACTUR ING PMNTS...
* NATIONAL TOTALS *
FLOW IT OBSERVFC 1968 LEVEl
1968 FLOW CONDITIONS ( 1967 OCLLARS)
691
M'VNUF'VCIUR ING EMPLOYMTNT
Fl OW ( MGY)
TI1TAL CAPITAL COST
TOTAL ANNUAL DEM COST
THTAL ANNUAL COST
COST RANGF
> 500000.
CO
(J\
OS
1 00000.
50000.
! 0000 .
0.
rncT D Af
TO
TH
TH
TO
iicr
500000.
I 00000.
50000.
10000.
MI f,j
AV?
TOT
sn
> 50COOOO.
1000000. TO 5000000.
500000. TO 1000000.
100000. T0<|5COOCO.
o. rn 100000.
*2*
213.
4 .
24,
16446,
23 .
0.
0.
0.
0.
0.
MAXIMUM
3360.
3227.
2144887.
1 427S8.
403228.
0£M
10554117.
OISTR
PAX IMUM
C.
1427S9.
1H17.
49174.
99S7.
MINIMUM
28.
16.
73886.
2144.
12039.
ANNUAI COST OF kASTE
REPl ACEMENT
I l'-09<;48.
AVER\GE
213.
228.
336033.
15274.
5 79*> 7.
TREATMENT
INTEREST
1 7879312.
TOTI\L
147275.
I 57348.
23219899?.
10554117.
40041344.
TOTHL
40043376
ItJUTION OF 1PFRATION AND MAINTENANCE CCST
M IN IMUM
0.
U47C7.
50368.
10004.
2144.
AVERAGE
0 .
129444.
65089.
19281 .
6365.
TOTAL
0.
388333.
1431949.
6709725.
2024175.
DISTRIBUTION OF- INVESTMENT REQUIREMENTS
MAXIMUM
0.
26811C8.
977606.
491883.
97389.
DISTRIBUTION
*3* *4*
0. 0.
0. 0.
0. 0.
o. i.
0 . 0.
MINIMUM
0 .
101 1149.
503597.
IT2165.
92358.
OF TOT&L C4PIT4L CCST
*5* *6*
0. 978.
0. 44.
0 . 1 76 .
0. 121316.
0. I 17.
AVERAGE
0.
1392705.
606593.
283577.
94942.
FOR TREATMENT ( $ 1000
*7* *8*
0 . 9 54 .
0. 27.
0. 1 37 .
0. 94432.
0 . 1 09 .
TOTAL
0.
48744704.
96122992.
144908080.
474711.
#9* *10*
0. 0.
0. 0.
0. 0.
0 . 0.
o. 0.
S.D.
261.
328.
248986.
15260.
46757.
S.D.
0.
14096.
1 3156.
9429.
2005.
S.D.
0.
419580.
144994.
97292.
1790.
NUMBEK
C.
3.
22.
348.
318.
NUMBER
0.
35.
140.
511.
5.
0.
0 .
0.
0.
0.
*12*
0.
0.
0.
0.
0.
DISTRIBUTION OF ANNUAL 06" TREATMENT CCSTS ($ 1000)
MIN
AVE
TOT
sn
r.
o.
o.
o.
0 .
*2*
4.
O.
1 ,
676,
I ,
*3*
*4*
*5*
*6*
*7*
*8*
o .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
1C7.
1 .
1C.
71 57.
11 .
0.
0.
0.
0.
0.
31
I
4
2721
3
*9*
0.
0.
0,
0.
0.
*10*
0.
0.
0.
0.
0.
*u*
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
SO O« S.O. REPRESENTS STNND*RD DEVI\TION. THt D»T* OISTRIBUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE... 2041
TOTAL NUMBER OF MANUFACTURING PUNTS...
* NATIONAL TOTALS *
FLOW »T OBSERVED 1968 LtVEL
1968 FLOW CONDITIONS 1 1967 DCLIARS)
45
EMPLOYMENT
FLOW 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000
ICOOOO,
50000,
10000
5000000
1000000
500000
100000
DISTRIBUTION OF OPERATION AN'O MAINTENANCE CCST
f AX I MUM
0.
0.
0.
237C7.
8913.
MAXIMUM
0.
C.
0.
419160.
99756.
MINIMUM
0,
0,
0 .
10753.
2562.
AVERAGE
0 .
6.
15228.
4848.
DISTRIBUTION OF INVESTMENT RECJIREMENTS
MINIMUM
0 .
^.
0.
100585.
68525.
AVERAGE
0.
o.
0.
166866.
84440.
TOTAL ^
0.
0.
0.
106599.
184223.
TOTAL
0.
0.
0.
5673433.
928840.
*2*
DISTRIBUTION OF TOTAL C4PIT4L CCST FOR TREATMENT <$ 10001
*4* *5* *6* *7* *8* *9*
S.D.
0.
0.
0.
4930.
1573.
5 .0.
0.
0.
0.
76698.
10087.
NUMBER
0.
0.
0.
7.
38.
NUMBER
0.
0.
0.
34.
11.
*10*
*ll*
*12*
MAX
WIN
AVE
TOT
SO
0.
0.
0.
0.
0.
0,
0,
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
215.
39.
79.
3558.
38.
0.
0.
0.
0.
0.
135.
18.
43.
1944.
25.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*2*
*3*
DISTRIBUTION OF ANNJAL OEM TREATMENT COSTS ($ 1000»
*4* *5* *6* *7* *8* *9*
*10*
*11*
*12*
MAX
MIN
»VE
TOT
SO
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
19.
2.
5.
208.
4.
0.
0.
0.
0.
0.
5.
1.
2.
fl3.
1.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SI C CODE.. . 204?
TOTAL NUMOER OF PANUFACTUK ING PLANTS...
* MATIONAL TOTALS *
PLOW AT TBSERVCC 196H LEVEL
1<"S8 FLOW CONDITIONS I 1967 DOLLARS)
•58
MANUFACTURING EMPLOYMENT
FL OW ( MHY )
TOTAL TAPITAL COST
TOTAL IkNNlUL 0£M COST
TOTAL AMNUAt COST
MAXIMUM
1000.
339.
336605.
21721.
64469.
115.
21.
60056.
2368.
AVERAGF
261.
93.
13429 I.
6916.
23971.
TOTAL
15126.
5380.
7788899.
401135.
1390323.
S.D.
194.
71.
57889.
3789.
L1093.
ANNUAL COST OF WASTE
0£M REPLACEMENT
4C1135. 389445.
IRtATMENT
INTEREST
599745.
TOTAL
13903?4.
DISTRIBUTION OF OPERiTICN ANU MAINTENANCE CCST
to
OJ
o
COST RANGE
> 50000C.
100000. TO
•50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
looooco. TP
500000. TO
ICOOOO. TO
0. TO
soooor.
100000.
5000C.
10000.
50COOOO.
1 000000.
500000.
ICOOOO.
MAX
MIN
4VE
TOT
SO
*1*
p.
0.
0.
o.
0 .
0 .
0,
0 .
MAXIMUM
0.
C.
0.
21721.
M JNIMUM
0 ,
'•.
0.
100 11 .
2368.
AVhRAGt
P.
0 .
0.
13253.
5433 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
0.
0.
403926.
97314.
M I N I MI !M
AVFRAGE
0.
0.
0.
1)0247 .
72068.
0.
0 .
0.
174875.
TOTAL
o.
o.
0.
145781.
25535',.
TOTAL
0.
0.
0.
8568852.
777837.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3*
*4*
*5*
*6*
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
207
41
87
5020
35
0.
0.
0.
o.
o.
*8*
129.
20.
48.
2769.
23.
*9*
0.
0 .
0.
0.
0.
*io*
0.
0.
0.
0.
0.
S.D.
0.
0.
0.
3495.
1812.
S.D.
0.
0.
0 .
66903.
9490.
*ll*
0.
0.
0.
0.
0 .
NUMBER
0.
0.
0.
11.
47.
NUMBER
0.
0.
0.
49.
9.
*L2*
0.
0.
0.
0.
0.
MAX
MIN
WF
TOT
sn
*i*
o.
r.
o.
*2*
0 .
0.
p.
0 .
0.
DtSTRIRUTION OF ANNUAL O&P TREATMENT CCSTS «$ 1000)
*5* *6* *7* *8* *9*
0.
0.
n.
0.
0.
0.
0.
0.
0.
0.
0.
'0.
0.
0.
0.
17
1
«;
290
1
0.
0.
0.
0»
5,
1 ,
2 .
I 12.
I ,
*1C*
*11*
*12*
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
e.
0.
'. *
0.
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD Dt-VlATtON. THF DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
src cnoe:... 20*3
TOTAL NUMPFR OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVF.I,
1-568 FLOW CONDITIONS t 1967 DOLLARS)
10
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPrTAL COST
TOT4L 4NNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
4200.
349.
326017.
24231.
65635.
MINIMUM
68982.
3240.
12COO.
AVERAGE
976.
93.
134727.
7455.
24565.
TOTAL
9760.
928.
1347266.
74549.
245652.
i.o.
1164.
96.
74906.
6307.
15797.
OSM
ANNUAL COST OF HASTE TREATMENT
REPLACEMENT INTfcREST
74549.
67363.
103739.
TOTAL
245652.
to
en
h-»
COST RANCE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000
100000
50000,
1 00 00
5000000
1000000
500000
100000
DISTRIBUTION OF QPER4TICN UNO MAINTENANCE CCST
MAXIMUM
0.
C.
0.
24231.
6909.
MAXIMUM
0
0.
0.
391220.
82779.
MINIMUM
0 .
0.
0.
11307.
3240.
0 ISTRIBUTION OF
MINIMUM
0 .
0 .
0.
105721.
82779.
AVERAGE
0.
0.
0.
17/69.
4876.
INVESTMENT RfQUIREMENTS
AVEPAGF
0.
0 .
0.
170438.
82779.
TOTAL
0.
0.
0.
35538.
39012.
TOTAL
0.
0.
0.
1533940.
82779.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT t$ 1000}
S.D.
0.
0.
0.
9139.
1103.
S.O.
0.
0.
0.
90693.
0.
NUMBER
0.
0.
0.
2.
8.
NUMBER
0.
0.
0.
9.
1.
MAX
MIN
a VF.
TOT
so
*1*
0.
0.
0.
0.
0.
*2*
0.
0.
0.
0.
0 .
*3*
0.
i^ .
0.
0.
0.
*4*
0.
0.
6.
0.
0.
*5*
0.
0.
o.
0.
0.
*6*
201 .
46.
87.
868 .
45.
*7*
0.
0.
0.
0 .
0.
*8*
125.
23.
48.
479.
30.
#9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*H*
0.
0.
0.
0.
0 .
*12*
0.
0.
0.
0.
0.
MAX
M!N
iwe
TOT
so
*l*
*2*
*3*
DISTRIBUT! ON OF ANNUAL 0£M TREATMENT CCSTS ($ 1000>
*4* *5* *6# *7* *8* *9*
*10*
*ll*
*12*
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
n .
0.
0.
C.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
19.
2 .
5.
54.
5.
0.
0.
0 •
6.
0.
5.
1.
2 .
20.
1 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
OR S.D. REPRESENTS STANDARD DEVIATION. -THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOTAL NUMREP
2044
OF MANUFACTURING
* NATIONAL TOTALS *
FLOW AT C1BSERVEC IQffl LEVEL
1968 FLOW CONDITIONS t 1967 OOLURS )
PLANTS...
MANUFACTURING EMPLOYMFNT
FLOW (MHY)
TOTAL CIVPI TAL COST
THT4L *NNU»L 0£M COST
TOTAL ANNUAL COST
MAXIMUM
450.
312.
256840.
16862.
48700.
M IN MUM
150.
104.
134R3 }.
5571.
AVERAGF
219.
189.
188235.
10445.
34351.
TOTAL
1975.
1705.
1694112.
9400?.
309155.
S.D.
101.
82.
47649.
4114.
10007.
ANNUAl COST OF ViASIE
06M REPLACEMENT
?4002. 84706.
TREATMENT
INTERFST
TOTAL
309154.
DISTelBUTION OF HPERATICN AND PAIN1ENANCF CCST
to
O3
CO
COST RANGF
> 5000CO.
100000. TO
50000. TO
100CO. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TP
100000. TO
0. TH
500000
I 00000
50000
10000
5000000
1000000
500000
1'SOOOC
"AX
A VF
TOT
SO
MAXIMUM
0.
0.
0.
16862.
9734.
MAXIMUM
0.
0.
0.
308208.
0.
MINIMUM
0 .
0.
0.
10950.
5571.
AVERAGE
o,
o.
o.
13457.
6f>79.
0 ISTRIBUTION OF INVESTMENT REQ'J IREM bNTI
MINIMUM
AVEPAGF
16 180
0.
0.
0.
3 .
0.
0.
0 .
">.
225882.
0.
TOTAL
0.
0.
o.
67285.
26717.
TOTAL
0.
0.
0.
2032936.
0.
DISTRIBUTION UF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*6* *7* *8* *9*
*10*
S.D.
C.
0.
0.
2282.
2040.
S.D.
0.
0.
0.
57178.
0.
NUMBER
0.
0.
0.
5.
4.
NUMBER
0.
0.
0.
9.
0.
*ll*
*12*
0.
0.
0.
0.
0.
0.
0 .
n.
0.
0 .
0.
o. •
n .
0.
0 .
0.
f\.
0.
0.
0.
0.
0.
0.
0.
n.
159.
67.
I 19.
1 .168.
28.
0 .
0.
0.
0 .
0.
98 .
48 .
70.
626 .
19.
0.
0.
0.
0.
0.
0.
0.
C.
0.
0.
0. *
0.
^r' •
0.
0 .
0.
0.
0.
0.
0.
"4X
MIN
dVF
TIT
SD
*1*
0.
0.
0.
0.
0.
*2*
0.
a.
*3*
DISTRIBUTION OF ANN'JAt 0£M TREATMENT CCSTS (* 10001
*4* *5* *6* *7* *8* *9*
'-.I .
0.
0.
n.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
1.
13
4
fl
71
1
*10*
*ll*
*12*
0.
0.
0 .
0.
' ! 9
4.
2.
3 .
23.
I .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
SO 11R S.n. REPRESENTS STANDARD DFVIATICN. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
src CODE... ?045
T1TAL NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FIOW AT OBSERVED 1968 I EVEL
19 68 FLOW CONDITIONS ( 1967 0"Ll W»S J
MANUFACTURING EMPLOYMCNT
FLOW (MGY)
TOTAL CAPITAL COST
TOTM. iNNl^L OEM COST
TOTAL ANNUAl COST
MAXIMUM
2fl5.
160.
206910.
12159.
38336.
MINIMUM
28.
80423.
3139.
13615.
AVERAGE
136.
80.
133767.
6560.
23549.
TOTAL
2180.
1283.
2140266.
104964.
376778.
S.D.
82.
44.
45572.
2754.
8453.
ANNUAL COST OF hASTE
OEM PEPLACfMENT
1C4964. 107013.
TREATMtNT
INTEREST
164800.
TOTAL
376778.
DISTRIBUTION OF TPER8TICN 4NO MAINTENANCE CCST
to
CD
CO
COST RANGE
> 500000.
1000CO. TO
•50000. TO
10001. TP
0. TO
COST RANGE
> 50COCOO.
1000000. TO
500000. TO
100000. TO
0. TO
500000,
100000,
50000,
10000
5000000
1000000
500000
100000
!«AX
WIN
AVE
TOT
SO
PAX
MINIMUM
AVERAGE
0.
12059.
9467.
0.
10215.
313<5.
0,
1 1137.
5907 .
DISTRIBUTION1 OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
0.
0.
MINIMUM
0.
0.
0.
11413? .
96508.
4VERAGF
0.
0 .
0.
174914.
98979.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT {* 1000)
TOTAL
0.
0.
0.
22273.
82691.
TOTAL
0.
0.
j •
2273881.
294438.
*
C.
0.
C.
C.
0.
*2*
0.
0 .
o .
0.
0 .
*3*
n.
P.
o .
0.
r .
*«*
o.
o.
o,
*6*
*7*
*8*
*10*
*ll*
S.D.
0.
0.
0.
1304.
222?.
S.D.
0.
C.
0.
50407.
1420.
NUMBER
0.
0.
0.
2.
14.
NUMBER
0.
0.
C.
13.
3.
n ,
0.
0.
0.
0.
131 .
53.
87.
1387.
28.
0 .
0.
L' *
0.
0.
75 .
?7 .
47.
754.
17.
0.
0 .
0.
0.
n .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
MAX
TOT
SO
*1*
0.
0.
p.
0.
0.
*2*
0 ,
r.
o.
0 ,
0,
*3*
0 .
0.
o.
r.
o.
DISTRIBUTION OF ANN'AL OEM TREATMENT CCSTS (* 1000)
*A* *5* *6* *7* *«* *9*
0.
o.
0.
0.
0.
"10*
*11*
*12*
9.
2.
^ .
>.
0.
0.
o .
0.
n .
3.
I .
2 .
30.
I .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
n.
0.
0.
0.
0.
0.
so
PR S.D. RFPPESFNTS STANDARD OFV1ATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE.. .
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIPNAL TOTALS *
FLCVI AT OBSERVED Nhfl I EVFL
1968 F-LOW CONDITIONS ( 1967 Df'lL&RS)
MANUFACTURING EMPlOYMfcNT
FL nw ( MCY )
TOTAL CAPITAL COST
Tm&L ANNUAL OGM COST
TOTAL ANNUAL COST
MAXT1UM
2700.
1488.
2463442.
142560.
455417.
MIMIMUM
25.
20.
100637.
?345.
AVFRAGt
537.
85?.
864075.
41461.
ISt193.
T01AL
11279.
17R87.
18145584.
rt70674.
3175159.
s.u.
649.
941.
659589.
38618.
122217.
DGM
ANNUAL COST OF WASTE TREATMENT
REPLACFMENT INTEREST
870674.
90727?.
1397209.
TOTAL
3175161,
to
(*>•
COST RANGf
> 500000.
100000. TCI
50000. TO
10000. TO
n. TO
500000.
100000.
50000.
10000.
CPST PANGF
> 5000000.
1000000. TO 5000000.
^ooooo. TP 1000000.
100000. TO 500000.
n. TO 1COOOO.
DISTRIBUTION
:tfUM x
o.
14256C.
1 1826.
46C79.
9488.
OF OPERATIC AhD
111458.
•50201.
10ROO .
2345.
MAINTENANCE COST
AVERAGE
0.
127009.
66136.
24505.
4759.
DISTRIBUTION OF INVESTMENT RtQUIREMENTS
MAX
AVF
TOT
SO
MAXIMUM
0.
3202472.
899983.
403397.
0.
MINIMUM
0.
124753S.
539389.
130R28.
n .
AVERAGF
0.
1860593.
701853.
245677.
0.
*1*
0.
0.
0.
c.
0.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT {* 1000)
TOTAL
0.
254018.
396819.
196043.
23794.
TOTAL
0.
18605936.
3519265.
1474063.
0.
*2*
441 .
9.
134.
2804.
119 .
*3*
C.
0.
0.
n.
o.
*4*
0.
0.
0.
0.
0.
*5*
0.
0.
o.
*6*
11 14.
61.
422.
8863.
*7*
0.
0.
0.
0.
0.
*8*
908 ,
31 .
308,
6478 ,
244.
*<)*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
s.o.
0.
21992.
14167.
11856.
2768.
S .D.
C.
635166.
135152.
105356.
0.
NUMBER
0.
2.
6.
8.
5.
NUMBER
0.
1C.
5.
6.
0.
*ll*
0.
0.
u.
0.
0.
*12*
0.
0.
0.
0.
0.
MIN
AVF
TOT
SO
*l*
0.
0.
0.
0.
o.
*2*
7 .
P.
3.
54.
2.
0.
0.
0.
0.
0.
DISTRIBUTION OF ANNUAL OSM TREATMENT CCSTS it 1000 )
*4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
r.
o.
o.
o.
o.
I U.
1,
31.
655.
0.
0.
0.
0.
0.
25.
1 ,
a.
162.
7.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC en OF... ?05
TOTAL Mir^RER CF MANU F ACTUR INC PLANTS...
L TOTALS *
Ft 3W AT OBSERVED I960 LEVFl
FlOW CONOIT IUNS ( 19f>7 DOLLARS!
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAl 0£M COST
TOTSL ANNUAL COST
MAXIMUM
2500.
177.
2425P8.
14644.
MI N IM UM
195.
7.
29877.
1310.
5104.
AVfcRAGt
379.
21.
60758.
2R54.
10571.
TOTAL
103922.
5795.
16647684.
78213).
2896323.
i .0.
274.
18.
27048.
1405.
4805.
OSM
782131
ANNUAL COST OF MSTE
REPLACEMENT
832384.
TREATMENT
INTEREST
1281871.
TOT AL
2896386.
DISTRIBUTION OF OPERATIC*, 4NO MAINTENANCE COST
CO
05
VI
CHST R »NGE
> 500000.
looooo. TR
50000. TP
10000. TO
0. TO
COST R4NGF
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
50COOO,
100000
SOOOO
10000
•^000000
1000000
500000
KOOOO
MAXIMUM
0.
0.
0.
14644.
8677.
0.
0.
0.
303235.
99959.
MINI
AVERAGE
0.
0 .
0.
I 4644 .
1310.
0.
0 .
0.
14644.
2811 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
0 .
0.
100878.
37347.
IWERJGE
0.
0.
0.
136900.
64P13.
TOTAL
0.
0.
o.
14644.
767487.
TOTAL
0.
0.
0.
5749784.
15059847.
s.o.
0.
0.
0.
0 .
1211.
S.O.
0.
0.
0.
40974.
15977.
NUMBER
0.
0.
0.
1.
273.
NUMBER
0.
0.
0.
42.
232.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT <$ 1000)
MAX
* !N
AVF
TOT
so
0.
0.
0.
0.
0.
*2*
16.
1.
3 .
8LQ.
2.
*3*
*6*
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
n.
0.
143
20
35
10672
16
*7*
0.
0 .
0.
o.
0.
*8*
83.
9 .
19.
5157.
9 .
*io*
*11*
*12*
0.
0.
0.
0.
0.
0.
c.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
M»X
MIN
AVE
TDT
SO
*l*
0.
0.
0.
0.
0.
*2*
1.
0 .
0.
120 ,
o.
*3*
DISTRIBUTION OF UNNJUL OEM TRE»TMENT COSTS <* 1000
*5* *6* *7* *8*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
1C
1
1
4C8
1
0.
0.
o.
o.
0.
3 .
0.
1.
254.
0.
*10*
*11*
*12*
0.
0.
0.
0.
0.
0.
f).
0.
0.
0.
0.
0.
• o.
0.
0.
0.
0.
0.
0.
0.
OR S.O. REPRESENTS STANTARC DEVIATION. THE DATA DISTRIBUTION USED ISHIGHIY SKEWED.
-------
SIC CODE... 2061
TOTAt NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FL 3W AT OBSERVED 1968 LEVEL
1068 FLOW C'JKOITICNS ( 1967 0"LL 4RS )
MANUFACTURING EMPLOYMFNT
FI OH ( MGY )
TOTAL CAPITAL COST
TDTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXI MUM
3450.
81468.
39821440.
3125120.
8182441.
M IM IMIIM
6.
165.
459850.
18508.
77515.
AVtRAGE
195.
4822.
3790706.
266359.
747774.
TOTAL
9544.
236266.
185744624.
13051604.
36640928.
S.C.
504.
11934.
5976919.
470947.
1229663.
ANNUAL COST OF WASIE
OEM RFPLACEMENT
13C51604. ^287230.
TREATMENT
INTFREST
14302329.
TOTAL
36641152.
DISTRIBUTION OF TPFR4TICN
CO
05
OS
COST RANGE
> 500000.
IPOOOO. TO
50000. TO
10000. Tr
0. TP
CCST RANGF
> 5000000.
1000000. TP
500000. TO
100000. TO
0. TO
500000
100000
50000
10000
*ocoooo
1000000
5000CO
100000
MAX
WIN
A VF
TOT
SO
*2*
MAXIMUM
3125120.
437336.
95963.
45577.
0.
MA XI MIJM
53758912.
4605413.
755214.
0.
0.
MINIMUM
509459.
10567V.
54625.
18508.
0.
MAINTENANCE CCST
AVERAGE
966711.
213074.
72463.
3 1879.
0 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5231141.
1024012 .
0 .
0.
AVERAGE
12169974.
2183109.
678104.
0.
o.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT (t 1000)
*3* */»* *5* *6* **7* *8* <
TOTAL
7733691.
4048406.
1014485.
255031.
0.
TOTAL
182549616.
65493296.
2712415.
1.
0.
*10*
S .0.
885569.
108011.
10451.
1 1036.
0.
S.D.
12005957.
907237.
65280.
0.
0.
NUMBER
8.
1?.
14.
8.
0.
NUMBER
15.
30.
4.
0.
0.
M2*
0.
0.
0.
0.
0 .
4064.
39.
401 .
19648.
622.
0.
0.
0.
0.
0 .
21509.
47.
1314.
64395.
3159.
0.
P.
0.
r.
n.
8209.
262.
1312.
64? 87 .
1315.
0.
0.
0.
0 .
0.
6039 .
1 11 .
764.
37415.
947.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
MAX
Ml*'
M/E
TOT
SO
*1*
0.
0.
0.
r.
*2*
5D .
I .
6.
28« .
P.
DISTRIBUTION OF ANNUAL OCH TREATHEKT CCSTS ($ 1000»
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
695.
3.
53.
2594.
104.
0.
1.
0.
0.
D.
2^45
12
1 82
8930
311
*10*
*12*
0.
0.
0.
0.
0.
335.
?.
25 .
1240.
49 .
0.
0.
0 .
0.
0.
0.
0.
0.
0.
C.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
SO OR S.O. REPRFSFNTS STANOARO DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... ?067
TOTAL NUMBER OF MANUFACTURING PLANTS,..
* NATIONAL TOTALS *
FLOW AT nSSERVEC 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS!
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOT4L ^NNU^L PGM COST
TOTAL ANNtlAI COST
MAXIMUM
1500.
2842716.
188C6C.
549C87.
MINIMUM
55.
38.
184694.
6913.
AVERAGE
38<>.
376.
760794.
38923.
135544.
TOTAL
6995.
6762.
13694294.
700611.
2439783.
S.O.
380.
471.
641887.
427R6.
123944.
ANNUAL COST OF WASTE
OSM REPLACEMENT
7CC6U. 684T15.
TREATMENT
INTEREST
105446C.
TOTAL
2439786.
DISTRIBUTION OF HPERATlCK AND HAINTENANCE CCST
to
a*
•4
COST RANGF
> 50COCO.
100000. TP
50000. TO
10000. TP
0 . TP
COST PANGE
> 5000000.
inoonoo. Tr
500000. TO
100000. TO
0 . TP
500000.
100000,
50000,
1 00 00
c. oooooo
1000000
500000
100000
MAX
MIN
'VVF
TOT
SD
MAXIMUM
0.
IH806C.
75581.
45777.
9059.
MAXIMUM
0 .
3P^76<51.
797603.
334585.
0.
MINIMUM
0 ,
188060.
55123.
I 809 '.
6913.
AVERAGE
0 .
188060,
68195.
27553.
8109.
DISTRIBUTION Of INVESTMENT REQUIREMENTS
MINIMUM
0 .
1055905.
521402.
749337.
0.
AVERAGE
0.
1825684 .
6419?!.
303512.
0.
TOTAL
0.
188060.
204584.
275532.
32437.
TOTAL
0.
12779794.
4493447.
1214049.
C .
*1*
0.
0.
0.
0.
0 .
DISTRIBUTION OF TOTAL CAPIT
-------
SIC COOP...
TOTAt NIIMRFR
2063
OF M4NUFACTUPING PL&NTS..,
* NATIONAL TITALS *
FLOW VT OBSERVEC 196P LEVEL
1968 FLOW CONDITIONS C 1967 OfLLARS)
60
M4NHF5CTURING EMPLOYMENT
FlOW (MGY)
T~!TAL CAPITAL COST
TOTAL ANNUAL OEM fQST
TOTAL ANNUAL COST
MAXIMUM
400.
3576.
3720409.
?76066.
748558.
MIMIMUM
9.
68.
764008.
12013.
4554?.
WDUGE
125.
1045.
96662.
<*93't70.
TOT4L
7498.
62703.
92980176.
5799703.
17608192.
s.o.
104.
921.
929961.
69590.
187341.
OEM
5799703.
ANNUAL COST OF feASTE TREATMENT
REPLACEMENT INTfcRFST
4649008.
715947C.
TOTAL
17608176.
CO
OJ
00
COST R4NGF
> 500000.
100000. TO
50000. TO
100 00. TO
0 . TH
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000
100000
^OOOO
10000
500000C
I 000000
500000
1COOOO
DISTRIBUTION OF OPERATION ANO MAINTENANCE COST
MHXI^'JM
0.
276066.
99476.
48581.
n.
MAXIMUM
5^22550.
476E540.
959815.
434402.
0.
MINIMUM
0.
103672.
50*05.
1 20 13 .
AVbRAGE
0.
179955.
71786.
32326.
0 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5022550.
1070645.
509263.
356410.
0.
AVERAGE
5022550.
776370.
404320.
0 .
TOTAL
0.
3599094.
1651067.
549548.
0.
TOTAL
10045100.
108830688.
5434592.
1212961.
0.
VAX
MIN
AVE
TOT
SO
*1*
0.
0.
r>.
0.
0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMEM] (t 1000)
402.
20.
157.
9432 .
103.
!*
0.
0.
0.
0.
0 .
*4*
1008.
20.
312.
18721.
265.
*5*
3.
n.
r.
^ B
0 •
*6*
1484.
160.
719.
43161 .
358.
*7*
C.
0.
0.
0.
0.
*8*
826.
63 .
36! .
21667 .
207.
*9*
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
s.o.
0.
53051.
16195.
13985.
0.
S.D.
0.
1067030.
165391.
41943.
0.
NUMBER
0.
20.
23.
17.
0.
NUMBER
2.
48.
7.
3.
0.
*11*
0.
0.
0.
0.
o.
*12*
0.
0.
0.
0.
0.
"AX
WIN
AVE
TOT
SO
0.
0.
0.
0.
0.
*?*
7,
I .
3,
184.
2.
0.
0.
C.
0.
p.
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8*
52.
2.
17.
1008.
13.
0.
0.
0.
0.
0.
1S3.
8.
67.
4049.
49.
0.
0.
0.
0.
0.
24.
2.
9.
559.
6.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO PR S.O. PFPPESFNTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SfC CODE... 207
TOTAL NUMBER CF MANUFACTURING PLANTS...
* N»TInr»AL TOTALS *
FLOW AT OBSERVED 1968 LEVFL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
S7
MANUFACTURING EMPLOYMENT
FLOH (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAl OCM COST
TOT4L 4NNU41 COST
MAXIMUM
3300.
377.
24811.
7CS85.
M IN!M UM
90.
1 5.
59165.
2410.
9924.
AVERAGE
570.
10?.
I 56609.
«287.
28176.
TOTAL
49630.
88«5.
13625002.
720990.
2451347.
S .D.
522.
80.
72904.
4917.
14097.
120990.
1NNU4L COST OF WASTE
REPLACEMENT
681250.
TRfcATMENT
INTEREST
1049124.
TOTAL
2451364.
CO
<£>
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AI\D MAINTENANCE COST
500000.
ICOOOO.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 50COOOO.
500000. TO 1000000.
100000. TO 500000,
n. TO 100000.
MAX
MIN
AVE
TOT
SO
n.
0.
0.
0.
*2*
28.
3.
ID .
855.
6,
MAXIMUM
0.
0.
0.
248 tl.
99-54.
MAXIMUM
0.
0.
0.
460745.
95123.
MINIMUM
0.
0 .
0.
10076.
2410.
AVERAGE
0.
0.
0.
15443.
6011 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
AVERAGE
0.
0.
0.
101002.
73956.
0.
0.
0.
211771.
85151.
TOTAL
0.
0.
0.
324293.
396697.
TOTAL
0.
0.
0.
16094593.
936665.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT {* IOOOJ
*3*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*5*
0.
0.
0.
0.
0.
*6*
210.
39.
<54.
8202.
41 .
0.
0.
0.
0.
0.
*8*
131.
18.
53.
4568.
26.
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
S.D.
0.
0.
0.
4295.
2122.
S.D.
0.
0.
0.
86383.
7124.
NUMBER
0.
0.
0.
21.
66.
NUMBER
0.
0.
0.
76.
11.
*12*
0.
0.
0.
0.
0.
MIN
AVP
TOT
SO
*1*
0.
0.
0.
0.
0.
0.
1.
64.
0.
*3*
0.
C.
0.
0.
0.
DISTRIBUTION OF ANNUAL OEM TPE»TMENT COSTS ($ 1000)
*4* *5* *6* *7* * 8* *9*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
18.
1.
6.
479.
4.
0.
0.
0.
0.
0.
5 .
I.
2,
178,
I ,
0.
0.
0.
0,
0.
#10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD HR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 208
TOTAt NUMBER Cf MANUFACTURING PLANTS...
* N4TICN4L TOULS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS*
646
MANUFACTURING EMPIOYMFNT
FlOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAI OEM COST
TOTHL 4NNU4L COST
MAXIMUM
5500.
2263742.
184342.
471837.
MINIMU*
4.
1.
17520.
819.
3044.
AVERAGE
207.
104.
168062.
7410.
28753.
TOTAL
133488.
67275.
108567904.
4786806.
18574608.
S.D.
379.
311.
210505.
13750.
40275.
OEM
4786806.
4NNUAL COST OF WASTE TRE&TMENT
REPLACEMENT INTEREST
5428394.
8359724.
TOTAL
18574912.
DISTRIBUTION OF OPERATICK, 4KD MSINTENUNCE COST
COST RANGE
> 500000.
CO
o
iboooo.
50000.
I 0000.
0.
rn<:T o M
TO
TO
TO
TO
ir.F
5COOOO
100000
50000
10000
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVf
TOT
SD
0.
0.
0.
0.
0.
*2*
151 .
0.
7.
4467.
12.
MAXIMUM
0.
184342.
89925.
47346.
<3957.
MAXIMUM
0.
2829677.
999361.
498629.
99848.
MINIMUM
0.
159257.
5C920.
10283.
819.
AVERAGE
0.
171799.
65170.
70987.
3562.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1005192 .
504757.
130093.
21900 .
4VERHGE
0.
1530862.
664845.
187204.
78383.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT {$ 1000)
*3*
0.
0.
0.
o.
0.
*4*
0.
0.
0.
0.
0.
*5*
0.
0.
0.
0.
0.
*6*
1093.
12.
61897.
107.
0.
0.
0.
0.
0.
*8*
1019.
5.
65.
42200.
92 .
TOTAL
0.
343599.
651705.
1846865.
1944750.
TOTAL
0.
19901216.
312476q6.
66457520.
0.
0.
o.
0.
0.
0.
0.
0.
0.
0.
S.D.
0.
17738.
12534.
8635.
1932.
S.D.
0.
572504.
144388.
94047.
14843.
NUMBER
0.
2.
10.
88.
546.
NUMBER
0.
13.
47.
355.
231.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIM
AVE
TOT
SO
*l*
0.
0.
0.
c.
0.
4.
0.
0.
322.
0.
*3*
0.
0.
0.
0.
n.
DISTRIBUTION OF 4NNU »L GSM TREATMENT COSTS I* 1000)
*6* *7* *8* *9*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
142.
0.
5.
3U2.
It .
0.
0.
0.
0.
0.
38,
0,
2.
1303 .
3.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 209
TOTAL NUMBER CF MANUFACTURING PLANTS...
* N«TIOM«L TOT4LS *
FL3W AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS < 1967 DOLIARS1
599
MANUFACTURING EMPLOYMENT
FLOW 500000.
10000(1. TO
soooo. tn
1 0000. TC
0. TO
COST RANGE
> 5000000.
1 000000. TH
500000. TO
100000. TO
0. TO
500000,
100000
50000
10000
5CCOOOO
1000000
500000
100000
MIN
WF
TOT
so
*l*
0.
c.
0.
0.
0.
c.
0.
0 .
0.
0.
MAXIMUM
4000.
5600.
2084463.
243379.
5C81C5.
OGM
7288299.
DISTR
MAXIMUM
0.
243379.
87160.
47186.
9958.
MINIMUM
3.
3.
19185.
669.
3106.
4NNUU COST OF WASTE
REPLACEMENT
5600595.
AVERAGE
137.
175.
18699B.
12167.
35916.
TRE&TMENT
INTtREST
8624913.
TOTAL
82144.
104704.
112011920.
7288299.
21513856.
TOTAL
21513792
IBUTION OF OPERATICN UNO MAINTENANCE COST
MINIMUM
0.
110677.
50012.
10046.
669.
AVERAGE
0.
177866.
58180.
19581.
5251,
TOTAL
0.
711465.
581803.
3994585.
2000551.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
1*4 X! MUM
0.
2605578.
8R10CR.
499217.
99930.
DISTRIBUTION
*3* *4*
0. 407.
0. 0.
o. n.
0. 7635.
0. 27.
MINIMUM
0.
1033089.
505399.
100121.
23981 .
OF TOTAL CAPITAL COST
*5* *6*
0 . 936.
0. 14.
0. 11C.
0. 65698 .
0. 87.
HVER1GE
0.
1707126.
631032.
223734.
76147.
FOR TREATMENT (* 1000)
*7* *8* *
0. 742.
0. 5 .
0. 65.
0. 38673.
0. 63 .
TOTAL
0.
10242758.
22717168.
97995584.
9061503.
OR S.D. REPRESENTS STANDARD CEVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE.. . 22
TOTftL NUMBER OF MANUFACTURING Pl&NTS..
* NAT IUNAL TOTALS *
MOW HT OBSERVED 1968 LtVFl
196fl FLOW CONDITIONS ( 1967 DOLLARSI
1071
MANUFACTURING EMPLOYMENT
Fl OW (MGY)
TOT4L C4PIT4L COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
9000.
1601 387.
1 10565.
275961.
MI NIMUM
35.
16.
51579.
8395.
4VER4GE
537.
212.
246214.
1111 9.
42385.
TOTS!
548467.
216613.
2513844^,8.
11352714.
43274656.
S.O.
602.
268.
172150.
9666.
31020.
ANNUAL COST OF WASTE
GEM REPLACEMENT
I 1352714. 12569221.
TREATMENT
INTEREST
19356592.
TOTAL
43278512.
CO
-3
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TC
COST RANGF
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000
100000
50000
I 0000
5000000
I 000000
500000
100300
MAX
MIN
4VF
TOT
SO
*l*
DISTRIBUTION OF OPFRATION
MAXIMUM MINIMUM
o. o.
U0565. U0565.
91627. . 50933.
49678. 10011.
9996. 1815.
AND MAINTENANCE CCST
0 .
110565.
66937.
17764.
6094.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
2001733.
9^3253.
494314.
99842.
MINIMUM
0.
105104?.
500009.
100633.
64473.
AVERAGE
0.
1301783.
646767.
251704.
84338.
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TREATMENT ($ 100O>
*3*
0.
0.
0.
0.
0.
58.
e .
6.
348 3 .
5, .
261.
0.
40.
22482.
30.
225
0
10
9309
17
*•?*
0.
--*
•
0.
0.
0.
*6*
771.
26.
139.
1277 17.
96.
*7*
0.
0.
0.
0.
0.
*8*
605 .
15.
87.
88887.
67.
TOTIVL
0.
110565.
535499.
6910052.
3796677.
TOTAL
0.
23432096.
73730880.
713696672.
3373509.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
0.
0.
11155.
7888.
2040.
S.D.
0.
289421.
122923.
100399.
1 1305.
NUMBER
0.
1 .
8.
389.
623.
NUMBER
0.
18.
!!•».
849.
40.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
WIN
AVE
TOT
SO
*1*
0.
0.
0.
0.
0.
0 .
0 ,
264.
0 .
21 .
0.
1067.
DISTRIBUTION OF ANNUAL 0 CM TREATMENT COSTS (* 10001
*7* *8* *9*
9.
0.
I.
774.
1.
0.
0.
0.
• *
0.
83.
1.
7.
6771 .
7.
0.
0.
0.
0.
0.
19.
1.
2.
2477,
2.
0.
0.
D.
0.
0.
*io*
o.
0.
0.
0.
0.
Ml*
0.
0.
0.
0.
0 .
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
StC CODE... 221
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NUTICNAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
196B FLOW CONDITIONS ( 1967 DOLLARS)
199
MANUFACTURING EMPLOYMENT
FlOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OtM COST
TOTAL ANNUAL COST
MAXIMUM
9000.
2415.
1280798.
816?7.
244288.
MINIMUM
280.
74.
147929.
4731.
24100.
AVERAGE
866.
242.
29376 I.
11707.
49015.
TOTAL
172225.
48143.
58458400.
2129701.
9754044.
S.O.
915.
155171.
9100.
28721.
OEM
2329701.
ANNU&L COST OF W4STE TREATMENT
REPLACEMENT INTEREST
2922919.
4501294.
TOTAL
9753914.
DISTRIBUTION OF OPERATION AND MAINTEN4NCF COST
CO
-4
COST R&NGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1 000000. TO
500000. TO
100000. TC
0. TO
•5 COO 00.
100000.
50000.
10000.
5000000.
1000000.
500000.
[00000.
MAX
MIN
AVF
TOT
SO
*1*
0.
0.
0.
0.
0.
*2*
0.
0.
0 ,
0.
0,
MAXIMUM
0.
0.
81627.
49678.
9841.
MAXIMUM
0.
1600997.
957721.
493841.
0.
MINIMUM
0.
0.
81627.
10181.
4731 .
AVERAGE
0.
0 .
81627.
17525.
708?.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM .
0.
1080600.
500590.
184911.
0 .
(VVERAGE
0.
1238244.
650887.
302943.
0.
TOTAL
o.
o.
81627.
1419564.
828558.
TOTAL
0.
4952S76.
16923072.
51197296.
0.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
100.
3.
10.
2073.
11.
0.
a.
n.
n.
0.
668.
9~< .
174.
34657.
82 .
0.
0.
0.
0.
0.
512.
52.
109.
21728.
62.
0.
0.
0.
0.
0.
*io*
0.
0.
0.
0.
0.
S.O.
0.
0.
0.
8668.
1465.
S.O.
0.
243301 .
120370.
80343.
0.
NUMBER
0.
0.
I.
81.
117.
NUMBER
0.
4.
26.
169,
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
HIM
AVE
TOT
SO
*1*
0.
0.
0.
0.
0.
*2*
0.
n,
o.
0 .
0.
*3*
0.
0 .
0.
C.
0 .
DISTRIBUTION OF ANNUAL OEM TRE«TMENT COSTS (« 10001
*7* *8* *9*
7.
"'.
I.
154.
I .
0.
0.
0.
0.
0.
61 .
3.
8.
1666.
7.
0.
0.
0.
0.
0.
14,
I,
3,
509.
2,
0,
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE... 222
TOTAL NUMBER CF MANUFACTURING PLANTS...
* NHTIGN4L TOTALS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
105
MANUFACTURING EMPLOYMENT
Ft OW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOT4L 4NNUHL COST
COST R4NGE
> 500000.
100000. TO
50000. TO
I0000. TC
0. TO
5COOOO.
I00000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TC 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAXIMUM
2 [00.
670.
505656.
27752.
S1S70.
0£M
613801.
MINIMUM
t25.
33.
7089C.
2312.
11465.
4NNU4L COST OF H4STE
REPLACEMENT
794056.
DISTRIBUTION OF OPERATION
MAXIMUM
0.
0.
0.
2775?.
9543.
MINIMUM
0.
0.
0.
1 0092 .
2312 .
AVERAGE
444.
118.
151249.
5846.
25054.
TREATMENT
INTEREST
1222846.
AND M4INTEN&NCE COST
AVERAGE
0,
0.
3.
14448.
5039.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
1" HXIMUM
0.
0.
63207C.
479225.
99651.
MINIMUM
0.
0 .
632070.
108329.
88612 .
4VER4GF
0.
0.
632070.
1^0442.
92663.
TOTAL
46589.
12349.
L588H30.
613801.
2630673.
TOTAL
2630703.
TOTAL
0.
0.
0.
130028.
483773.
TOT4L
0.
0.
632070.
18663280.
555980.
S.U.
367.
99.
69324.
3438.
12182.
S.D.
0.
0.
0.
5478.
1657.
S.D.
0.
0.
0.
73828.
4245.
NUMBER
0.
0.
0.
9.
96.
NUMBER
0.
0.
1.
98.
6.
MAX
MIN
AVE
TOT
sn
*
0.
0.
0.
0.
0.
*2*
58.
6.
14.
1503.
8.
*3*
261 .
40.
82.
859?.
35.
*4*
0.
0.
0.
0.
0.
*5*
0.
•) .
0.
0.
0.
*6*
0.
0.
c.
0.
0.
*7*
0.
0.
0.
0.
0.
*8*
Ifl7
25
55
5786
26
*9*
*10*
*12*
0.
0.
0.
0.
0.
0.
0.
f\
0.
0.
0.
0.
a.
0.
0.
0.
0.
0.
0.
0.
M &X
MIN
AVF
TOT
so
*2*
*3*
DISTRIBUTION OF 4NNU 4L OEM TREATMENT COSTS (* 1000)
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
2.
3.
i.
66.
0.
21.
1 .
4.
400.
3.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
.&<*
5
I
1
149
I
*10*
*ll*
*12*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODF...
TOTAL NIIMRFR
2? 3
TF MANUFACTURING PLANTS...
* NATIPNM. TOTALS *
FLOW AT DBSERVFO I<)6R LEVFL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
100
MANUFACTURING EMPLPYMFNT
FLOW (MGYI
TOTAL CAPITAL COST
TOTAL ANNUAL CEM COST
THTHL flNNUU COST
MAXIMUM
3000.
2276.
1*01 387.
727H.
275S61.
MI NT MUM
18C.
TOO.
24171 8.
688 1.
3T579.
AVERAGE
480.
165.
504966.
18416.
82547.
TOTAL
48047.
36497.
50496592.
IR41596.
8254714.
S.O.
440.
331.
243533.
11748.
42585.
&NNUU COST OF W4ST6 TREATMENT
REPLACEMENT INTEREST
1841596.
2524829.
3888235.
TOTAL
8254660.
-a
en
COST R4NGE
> 500000.
moooo. Tn
50000. TP
lOOOn. TP
0. TO
DISTRIBUTION OF OPERATION AKO MAINTENANCE COST
500000.
10000C.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 10^0000.
100000. Tn 500000.
0. TO ICOOOO.
MAX
4VF
TOT
SO
*1*
0.
0.
n.
o.
n.
*2*
0.
0.
n ,
o.
0.
MAXIMUM
0.
0.
72731.
46644.
9996.
MINIMUM
0.
0 .
72585.
I 0011.
6881 .
AVERAGE
0.
0.
72658.
19076.
8888 .
0.
200 1733.
494314.
0.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
1064657. 1353503.
514296. 668770.
302148. 416316.
0 . 0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
TOTAL
0.
0.
145316.
1545190.
151097.
TOT4L
0.
13535033.
32100976.
17485264.
0.
*5*
*6*
0 .
0.
0.
0.
n
* •
225.
n .
39.
39O6.
34.
0.
0.
0,
0.
0.
771
145
279
279^2
1 17
*7*
0.
0 .
0.
0.
0.
605.
86 .
187.
1 8658.
93 ,
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
c.
S.O.
0.
0.
91.
8797.
782.
S.D.
0.
329093.
136736.
48432.
0.
NUMBER
0 .
0.
2.
81.
1 7.
NUMBER
0.
10.
48.
42.
0.
*11*
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MTN
A VF
TOT
SO
*1*
0 .
0.
0.
0.
n.
*2*
0.
0 ,
0.
*3*
0.
0.
DISTRIBUTION OF ANN'J »L GSM TREATMENT COSTS It 1000)
*7* * 8* *9*
9.
1 .
7.
'01.
I .
* 10*
*ll *
*12*
0.
0.
0.
o.
n.
52 .
5.
13.
1277.
8.
0.
0.
0 .
0.
0.
12 .
2.
4.
363 .
1.
0 .
0.
0.
0 .
0.
0.
0.
0.
o .
0.
0.
0.
0.
0.
0.
0.
0.
n.
0.
0 .
SO t'R S.D. REPRESENTS STANDARD CEVIATION. THF DATA OISTRIBUTICN USED IS HIGHIY SKEWED.
-------
SIC CODE... 226
TOTAL NUMBER OF MANUFACTURING PLANTS...
* N4TICNU TOTSIS *
F13W AT OBSERVED 1968 LEVEL
1068 FLOW CONDITIONS ( 1967 DOLLARS)
164
MANUFACTURING EMPLOYMFNT
FLOW (MGYI
TOTAL CAPITAL COST
TOTAL ANNUAI OEM COST
TOTAL ANNUAL COST
MAXIMUM
3250.
3944.
1297435.
I 10565.
275339.
MINIMUM
5C.
57.
97893.
4450.
16882.
AVFR', GE
264.
318.
'76032.
15H87.
50943.
TOTAL
43314.
52216.
45269184.
2605405.
8354692.
S.D.
350.
421.
155L02.
12730.
32341.
OEM
26C5405.
COST OF WASTE TREATMENT
REPLACEMENT INTEREST
2263459.
3485725.
TOTAL
8354589.
DISTRIBUTION OF 1PERATICN AND MS1NTEN&NCE COST
CO
COST RUNGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST R 4NGF
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TH 500000.
0. TO 100000.
MAX
« IN
&VF
TOT
SD
*1*
0.
0.
0.
r.
o.
*2*
0.
0.
0 .
0.
0.
MAXIMUM
0.
110565.
74120.
4949?.
9943.
MINIMUM
110565.
5C933.
I 0065.
4450.
AVERAGE
0.
110565.
59781.
18475.
7620 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
0.
1621793.
898743.
4832S3.
0.
MINIMUM
0.
1199966.
500009.
122367.
0 .
4VER1GE
0.
1410879.
637613.
283840.
0.
TOTAL
0.
110565.
1^9342.
1865967.
449557,
TOTAL
0.
2821759.
14027485.
39737584.
0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT {$ 10001
*3* *4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
102.
- ?.
9.
1496.
11.
0.
0.
0.
0.
0.
676.
63.
165.
27113.
82.
0.
0 .
0.
0.
0.
519.
33.
102.
16661.
6?.
0.
0.
0.
0.
0.
s.o.
0.
0.
12532.
8064 .
1586.
S.D.
0.
298278.
120140.
87124.
0.
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
NUMBER
0.
1.
3.
101.
59.
NUMBER
0.
2.
22.
140.
0.
0.
0.
0.
0.
0.
M4X
MIN
AVE
TOT
SO
0.
0.
0.
0.
0.
*2*
O.
0 .
0.
n .
o.
*3*
0.
C .
0.
o.
o.
DISTRIBUTICN OF 4NNU »L OGM TRE«TMENT COSTS ft 1000 »
*5* *6* *7* * 8* *9*
9.
0.
1 .
177.
1.
0.
0.
0.
0.
0.
3.
11 .
1877.
10.
0.
0.
0.
0.
0.
19,
I.
3 ,
551 .
2.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION.
THE DATA 01 STRIBl'TICN USfcO IS HIGHLY SKEWED.
-------
SIC CODE... 24
TC1TU NUMBER OF MANUF&CTUPING Pi ANTS...
19 6fl
405
* NAT IONAL TO 1AI S *
FLOW &T HDSERViD 196H LEVEL
FLHW CONDI riDNS ( 1967 DOLLARS!
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TDT&L C&PIT&l COST
TOTAL ANNUAl GGM COST
TOTAL ANNUAL COST
HUM
14500.
7138.
^082257.
235249.
611219.
MI NIMUM
75.
28.
80532.
2150.
12510.
WER\Gi
36".
47Q.
459464.
TOTAL
I 49384.
193860.
186083056.
10045325.
33676512.
s.o.
774.
721.
392104.
2H722.
78382.
ANNUAL COST (IF WASTf
Of.M REPLACFMENT
10045325. 93(14152.
TREATMENT
INTEREST
143283S6.
TOTAL
33677856.
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
n. TO
DISTRIBUTION OF 1PFRATIQN AND MAINTENANCE COST
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO ^000000.
500000. TO 1000000.
100000. TO 500000.
o. TP 100000.
MXWJM
0.
235249.
99660.
49874.
9970.
I»AX1MJM
0.
3R52321.
•5986 73.
49^478.
0.
MINIMUM
0.
n L7it.
52516.
I 0110.
2150 .
4VFR&GE
0,
155112.
71046,
4879.
5834.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUH
0.
1001174.
500552 .
100665.
0.
AVERAGE
0.
1600251.
702633.
268627,
0.
TOT4L
0.
1396009.
2442750.
5349049.
857575.
TOTAL
0.
76812048.
969S3312.
58829312.
0.
S.D*
i~i +
52034.
15268.
10226.
1993.
S.D.
0.
638536.
128008.
105486.
0.
NUMBER
0.
-------
SIC CODE...
TOTAL NUMBER
26
OF MiNUFACTUP ING PLANTS...
* NATIONAL TOTALS *
FLOW AT OBSERVtD 1968 LEVEL
1968 Ftnw CONDITIONS ( 1967 DOLLARS)
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL TtM COST
TOTAL ANNUAL COST
MAX!MUM
4000.
107829.
529C7440.
395662P.
10675863.
MI NIMUM
12.
8.
25804.
898.
4190.
4VF.R4GE
447.
3497.
1799236.
131282.
359742.
TOTAL
385511.
3U14715.
1550941440.
113165136.
310097408.
S P.
5'-0.
,.0048-
06M
113165136.
ANNUAL COST OF WASTE
REPLACEMENT
77547056.
TREATMENT
INTEREST
119472432.
TOTAL
310134528.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CO
-4
CO
COST RANGE
> 500000.
100000. TO
50000. TO
loooo. Tn
o. Tn
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000.
100000.
50000.
toooo.
5000000.
1COOOOO.
500000.
100000.
MAX
AVE
TOT
SO
0.
0.
0.
0.
0.
*2*
c>,
0.
0.
MAXIMUM
3T5662C.
492097.
92528.
49615.
99^7.
MAXIMUM
6613428E.
4989713.
997063.
493215.
^9799.
MINIMUM
501852.
100759.
50052.
10121 .
8 )8 .
AVER1GE
1173727,
212679.
70954,
2677Q.
5252.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5027460.
1018279.
513131.
100205.
32254.
AVERAGE
16730562.
2159297.
75 7471 .
2?4477.
77295.
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TRtATMENI (t 1000 I
TOTAL
598600PO.
34879312.
10146433.
7013743.
1271037.
TOTAL
1120947712.
639152128.
112105728.
60159792.
64!5444.
*3*
C.
0.
0.
C.
0.
*4*
21838.
1 .
570.
380867.
1892.
*5*
0.
r>.
p.
o.
3.
*6*
25.
569.
490077.
705 ,
0.
0.
0.
0.
0.
8930.
12.
6 18 .
434506.
979.
* 9*
0.
0.
0 ,
0.
0.
*10*
0.
0.
a.
o.
n.
s.r.
77910?,
95797.
14171.
t 1427,
2419.
S.D.
13425577.
1022028.
127523.
107581.
16570.
NUMBE P.
51.
164.
14 J.
262.
242.
NUMBER
67.
296.
148.
268.
83.
*11*
16679.
2 I 69.
6632.
245402.
3516.
*12*
0.
0.
0.
0.
0.
"AX
MIN
AVE
TOT
SO
*1*
P.
0.
0.
C.
0.
*2*
0.
0.
0.
0.
0 .
0.
0 .
0.
r.
o.
DISTRIBUTION OF ANNUAI OEM TREATMENT COSTS ($ 1000)
*4* *5+ *6* *7* *8* *9*
687.
n.
25.
16631.
61.
0.
0.
0.
0.
0.
1882 .
I.
67.
57468.
127.
0.
/ .
0.
0.
565 .
I .
23.
15888.
49.
0.
0.
0,
0.
0.
*10*
0.
0.
0.
0.
0.
*lt*
1735.
2 13.
626.
23177.
348 .
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN UStO IS HIGHLY SKEWED.
-------
SIC CODE... 261
TPT4L NUMBER OF MANUFACTURING PLANTS...
* NAT IONAL TOTALS *
FIOW AT OBSERVED i96a LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
37
to
CD
MANUFACTURING EMPLOYMENT
FI OW ( MGY)
TOT&L C&PTTH COST
TOTAL ANNUAL C£M COST
TOTAL ANNUAt COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
I 0000.
COST RANGE
> 5000000.
I 000000. TO 5000000.
5000CO. TH 1COOOOO.
100000. TO 500000.
O. TO 100000.
MAX
MIN
WE
TOT
SD
MAX
MIN
AVE
TOT
so
*l*
0.
0.
0.
0.
n.
*l*
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
0,
*2*
0.
0 .
0.
0.
0 .
MAXIMUM
3000.
107829.
529C7440.
3956620.
10675863.
OSM
45908720.
MINIMUM
?5C.
4681.
524921 0.
350638.
1017288.
ANNUAL COST OF WASTE
REPLACEMENT
34612144.
DISTRIBUTION OF OPERATION
fSXIMUM
3Q5662C.
478572.
0.
0.
0.
MINIMUM
648345.
350633.
0 .
0.
0 .
AVERAGE
922.
31688.
18709264.
1740776.
1616859.
TREATMENT
INTEREST
53302688.
AND MAINTENANCE COST
AVEfUGE
1343873 .
390229.
0 .
0.
0.
TOTAL
34108.
1172462.
692243200.
45008720.
133923808.
TOTAL
133823552.
TOTHL
44347840.
1560917.
0.
0.
0.
S.D.
675.
27712.
11672933.
833661 .
2300798.
S.D.
824706.
59489.
0.
0.
0.
NUMBER
33.
4.
0.
0.
0.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
VAX I MUM
66134288.
0.
0.
0.
0.
DISTRIBUTION
3* *4*
0. 21838.
0. 978.
0.. 6116.
0. 226283,
0. 5220.
DISTRIBUT
.3* *4*
0. 687.
r-. 37.
0. 186.
i. 6887.
0. 152.
MINIMUM
6561512.
0.
0.
. **i .
0.
AVERAGE
23386560.
0.
0.
0.
0.
OF TOTAL CAPITAL CCST F CR TREATMENT (t 1000
*5* *6*
0. 5441.
0. 939.
0. 2409.
0 . -'9121.
0, 1083.
*7* *fi*
0. 8930.
0. 1163.
0. 355?.
0. 131439.
0. 18R2.
.TOTAL
865303296.
0.
0.
0.
0.
I
*9* *10*
0. 0.
0. 0.
0 . 0.
0. 0.
0. 0.
s.o.
14591223.
0.
0.
0.
0.
Ml* *12*
16679. 0.
2169. 0.
6632. 0.
245402. 0.
3516. 0.
NUMBER
37.
0.
0.
0.
0.
ION OF ANNUAL OEM TREATMENT COSTS ($ 1000)
*5* * 6*
1. 1C 07.
0. 69.
0. 294.
0. 10883.
0. ?18.
*7* *8*
0. 527.
0. 27 .
0. 134.
0. 4962.
0. 117.
*9* *10*
0. 0.
0. 0.
0. 0.
0. 0,
0. 0.
"11* *12*
1735. 0.
213. 0.
626. 0.
23177. 0.
348. 0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THf DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE...
TDTM NUMBER
262
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( l<567 DOLLARSl
OF M4NUF&CTURINC PLANTS... ?74
MANUFACTURING EMPLOYMENT
F10W (MRY)
TOT\L C4PIT4L COST
TOTAL ANNUAI CSM COST
TOTAL ANNUAL COST
M4XIMUM
4000.
45293.
121S87S6.
1521770.
3071016.
MI NIMUM
75.
199.
31010?.
14804.
54187.
554.
4041.
1333350.
146081.
378921.
TOTAL
151858.
1107361.
502338048.
40026160.
103B24368.
s.o.
646.
6219.
1625825.
172014.
377035.
OEM
'« 0026160.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
25116896.
3868COOC.
TOTAL
103823056.
CO
CO
0
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
I 000000. TO
•500000. TO
100000. TD
0. TO
500000
100000
50000
1 0000
5000000
1000000
500000
1 00000
MAX
MIN
*VE
TOT
SO
DISTRIBUTION OF OPERATION
PJXTMUM MINIMUM
1521770. 501B52.
483134. 100759.
9S528. 5005?.
4933?. 14804.
0. 0 .
AND MAINTENANCE CCST
AVER4GE
708376.
2') 60 27.
&9820.
34869.
0.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
152484S5.
4989713.
997063.
476414.
0.
MINIMUM
50?7460.
1008279.
517233.
387628.
0.
AVERAGE
7793952.
2204992.
781536.
422424.
0.
C.
0.
0.
0.
0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000]
TOT4L
9917258.
21838864.
5795080.
2475697.
0.
TOTAL
163672992.
414538496.
48455248.
1267271.
0.
0,
0.
0.
0,
0.
*3*
0.
0.
0.
0.
0.
*4*
4216.
18.
352.
9640".
516.
*5*
0.
0.
0.
0.
0.
*6*
4000.
181 .
819.
224299.
568.
*?*
0.
0.
0.
0.
0.
3983.
111.
663,
181643.
554,
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
C.
0.
S.D.
279717.
91037.
13770.
9666.
0.
S.O.
2590898.
1042298.
129794.
47408.
0.
NUMBER
14.
106.
83.
71.
0.
NUMBER
21.
188.
62.
3.
0.
*11*
0.
0.
0.
C.
0.
*12*
0.
0.
0.
0.
0.
MAX
MtN
-------
SIC CODF... 263
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FLOW AT OBSERVED 196B I.EVEI
1968 FLOW CONDITIONS I 1967 DOLLARS)
198
MANUFACTURING EMPLOYMENT
Fl OW ( MGY)
TOTAL CAPITM C3ST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
4000.
97120.
21548C3?.
2950471.
MINIMUM
12.
46.
128102.
5326.
21595.
267.
3259.
1450011.
t15975.
300125.
TOTAL
52834.
645372.
237102208.
22963L20.
59424784.
S.D.
439.
8825.
2028647.
244244.
499276.
OGM
22963120.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
14355109.
22106848.
TOTAL
59*25072.
eg
CO
t— '
COST RANGE
> 500000.
ICOOOO. TO
50000. TO
10000. TO
o. Tn
COST RANGF
> 5000000.
1000000. TO
5000CO. TO
130000. TO
0. TO
5COOQO
100000
50000
I 0000.
5000000
1COOOOO,
500000
1 000 00,
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
MAX
M1N
AVE
TOT
SO
*l*
0.
0.
0.
0.
0.
0 .
0.
0.
CAXIMUM
2950471.
492097.
982S7.
49035.
9812.
fAXIMUM
26935040.
4954611.
995335.
493215.
0.
MINIMUM
557865.
106490,
50393.
10479,
5326.
AVERAGE
1398780.
216789.
72578.
29741.
8006.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5136670.
1027473.
561756.
liSOl2fl.
0.
AVERAGE
10219404.
2069341.
7A1415.
360977.
0.
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TREATMENT ($ 1000>
0.
0.
0.
0.
0.
*4*
8942.
4.
282.
55772.
769.
*5*
0.
0.
0.
0.
0.
*6*
61C1 .
80.
650.
128642.
638 .
*7*
0.
0.
0.
0.
0.
*a*
6505.
43.
519.
102667.
648.
TOTAL
5595120.
10839454.
4136922.
2319785.
72058.
TOTAL
919'F4640.
211072816.
46446304.
9385401.
0.
0.
0.
0.
0.
0.
S.D.
1061227.
98063.
14452.
9964.
1700.
S.D.
7066793.
1000913.
119572.
96916.
0.
NUMBER
4.
50.
57.
78.
9-.
NUMBER
9.
102.
61 .
26.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
so
*1*
0.
0.
0.
0.
0.
*2*
0.
0.
0.
o.
0 .
*3*
0.
0.
0.
o.
0.
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS ($ 1000)
*4* *"5* *6* *7* *8* *9*
503.
0.
17.
3436.
41.
0.
0.
0.
0.
0.
188?.
3.
79.
15676.
158.
0.
0.
0.
0.
565 .
2 .
19.
3850.
45.
0.
0.
0.
0.
0.
*io*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 264
TOTUt NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
159
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTIVL C4PIT4L COST
TOTAL ANNUAL C&M COST
TOTAL ANNUAL COST
M4XIMUM
4000.
1539.
520S80.
56635.
122800.
MINIMUM
65.
8.
25804.
898.
4190.
AVERAGE
480.
179.
134720.
10110.
27220.
TOTAL
76262.
28518.
21420512.
1607496.
4327918.
s.o.
543.
221.
83223.
9121.
19621.
ANNUAL COST OF WASTE
OEM REPLACEMENT
1607496. 1071025.
TREATMENT
INTEREST
1649378.
TOTAL
4327899.
CO
CO
to
COST RANGE
> 500000.
100000. TO
50000. TO
1 0000. TO
0. TO
COST RANGE
> 5000000.
I 000000. TO
5000CO. TO
100000. TO
0. TO
500000
100000
50000
I 0000
5000000
1COOOOO
500000
1 00000
MAX
MIN
4V F
TOT
SO
*l*
0.
0.
0.
0.
0.
*2*
0 ,
0.
0.
0.
0.
DISTRIBUTION OF OPERATION
P4XIMUM MINIMUM
0. 0.
0. 0.
56635. 56635.
49615. 10121.
9957. 898.
AND MAINTENANCE CCST
4VER4GE
0.
0.
56635.
18726.
5445.
MAXIMUM
0.
0.
651225.
460970.
99799.
0ISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
0.
548931.
100266.
32254.
0.
59883'..
190635.
74546.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000
*5* *6* *7* *8*
0.
0.
n.
o.
0.
120.
1.
15.
2463.
18.
0.
0.
0.
* *
0.
4C1.
25,
119,
18958,
66.
0.
0.
0.
0.
0.
0.
0.
0.
0.
o,
TOTAL
0.
0.
56635.
973730.
577155.
TOTAL
n.
o.
1796502.
21922976.
3056368.
0.
0.
n.
o.
0.
0.
0.
0.
0.
0.
s.o.
0.
0.
0.
9021.
2512.
S.D.
0.
0.
51195.
79263.
19091 .
NUMBER
0.
0.
1.
52.
106.
NUMBER
•o.
0.
3.
115.
41.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*1*
0.
0.
0.
0.
0.
*2*
0.
n.
0.
0.
c .
0.
f.
0 .
0.
0.
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS ($ 1000)
*6* *7* *8* *9*
12.
0.
2.
316.
2.
3.
n.
o.
o.
0.
44.
1.
8.
129?.
7.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*tl*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUT1CN USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOT&L NUMBER
265
OF MANUFACTURING PtANTS...
* NATIONAL TOTALS *
FLOW AT flRSERVLD 1968 LEVEL
1968 FL3W CONDITIONS ( 1967 DOLLARS)
142
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL C4PITAL COST
TOTAL ANNUAL GSM CC1ST
TOTAL ANNUAL COST
MAXIMUM
1770.
1098.
56UC7.
38275.
109536.
MINIMUM
193.
9.
3803C.
1530.
6360.
AVERAGE
40 L.
92.
129793.
6686.
23169.
TOTAL
56974.
13076.
18430576.
949406.
3290052.
S.O.
256.
122.
80411.
5576.
15723.
949406.
ANNUAL COST OF WASTE
REPLACEMENT
921529.
TREATMENT
INTEREST
1419153.
TOTAL
3290087.
CO
COST RANGE
> 500000.
100000. TC
50000. TO
10000. TP
0. TP
DISTRIBUTION DF OPERATION AND
500000.
I 00000.
50000.
10000.
COST RANGE
> 5001000.
1000000. TD 5000000.
5000CO. TO 1COOOOC.
100000. TO 500000.
0. TC 100300.
HIXIMUM
0.
0.
38275.
9955.
PAXIMUf
0.
0.
701384.
434644.
9S592.
MINIMUM
0.
0 .
0.
1 118^ .
1530.
MAINTENANCE COST
AVERAGE
0.
0.
0 .
172T8.
4744.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
M IN HUM
0.
0.
70 1384.
1002^5.
47538.
AVERAGt
0.
0.
701384.
191695.
79978.
TOTAL
0.
0.
. 0.
380113.
569293.
TOTHL
- 0.
701384.
1897779? .
3359080.
S.D.
0.
0.
0.
6481 .
2210.
S.O.
0.
0.
0.
87858.
13364.
NUMBER
0.
0.
0.
22.
120.
NUMBER
0.
0.
1 .
99.
42.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
MAX
MJN
avE
TOT
so
*l*
o.
0.
0.
0.
0.
*2*
0 .
0.
0.
0.
0.
*3*
0.
c.
o.
0.
0.
*4*
0.
0.
0.
0.
0.
*5*
0.
0.
0.
0.
0.
*6*
333.
?6.
t 1871.
48.
*8*
*9*
*10*
*12*
0.
0.
n.
0.
0.
228.
12.
46 .
6560.
32.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
u.
0.
p.
0.
0.
0.
0.
0.
0.
0.
*2*
DISTRIBUTION OF ANN IAL 06M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8*
*to*
*ll*
MAX
AVF
TOT
so
0.
0.
0.
0.
0.
0. 0.
0 . 0.
0. 0.
0. 0.
0 . 0 .
0.
0.
0.
0.
0.
D.
0.
0.
0.
0.
31 .
1.
5.
685.
4.
0.
0.
0.
0.
0.
7
1
2
264
I
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
SD OR S.O. REPRESENTS STANDARD DtVIATIQM. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 266
TOTAL NUMBER OF MANUFACTURING PtANTS...
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
52
MANUFACTURING EMPLOYMENT
Ft OW ( MGY)
TOTM. CMMMl COST
TOTAL ANNUAL C6M COST
THTAL ANNUAI COST
1620.
7823.
2372C51.
176253.
475877.
MINIMUM
45.
70.
158282.
5986.
260R8.
WERAGE
259.
930.
567191.
32989.
TOTAL
13475.
48345.
29493952.
1715450.
5461205.
S.O.
349.
1747.
509810.
40344.
104954.
OEM
1715450.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1474697.
2271033.
TOTAL
5461180.
CO
CO
COST RANGE
> 500000.
100000. TO
50000. TO
1 0000. TO
0. TO
500000.
100000.
50000.
I 0000.
COST RANGE
> 5000000.
I 000000. TO 5000000.
500000. TO 10COOOO.
100000. TO 500000.
0. TO 100000.
MAX
MIN
!\VE
TOT
r,o
0.
0.
0.
0.
0.
*2*
0 .
0.
0.
0,
o.
DISTRIBUTION OF OPERATION
PUXJMUM MINIMUM
0. 0.
176253. 141456.
973S2. 60411.
459S5. 1C187.
8774. 5986.
AND MAINTENANCE COST
0.
160154.
78901 .
22166.
7508.
TOTM
0.
640616.
157803.
864489.
52556.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
2965063.
979134.
4-52148.
0.
MINIMUM
0.
U75394.
513131 .
197853.
0.
AVERAGE
0.
2258934.
700314,
344300.
0.
0.
13553604.
14706590.
8607502.
0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 10001
*3*
0.
r.
o.
0.
0.
*4*
0.
0.
0.
o.
0.
*5*
0.
0.
0.
0.
0.
*6*
1281.
10?.
33?.
17241.
272.
#7*
0.
0.
0.
0.
0.
*8*
1091.
57.
236,
12253.
238,
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
c.
0.
0.
0.
S.O.
0.
17881.
2614').
9386.
904.
S.O.
0.
703752.
125626.
86282.
0.
NUMBER
0.
4.
2.
39.
7.
NUMBER
0.
6.
21.
25.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
4VF
TOT
SO
*l*
0.
0.
0.
0.
0.
*2*
0.
r> ,
0,
0.
0 .
*3*
0.
0.
0.
n.
0.
DISTRIBUTION OF ANNUAL 0£M TREATMENT COSTS (S 1000)
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
T.
0.
0 .
0.
0.
144.
4.
26.
1367.
33.
0 .
0.
0.
0.
0.
32.
2.
7.
348.
7.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 28
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
PLOW AT OBSERVED 1968 LEVEL
FLDvv CONDITIONS ( 1967 DULLARSI
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTHL C4PITH COST
THTAL ANNUAL CCM COST
TOTAL ANNUAL COST
MAXIMUM
28600.
469987.
1007273S84.
13''23192.
140946944.
5.
8881.
820.
1947.
WERAGE
550.
2002.
1714B50.
90355.
308067.
TOTAL
781889.
2844331.
2436803,072.
128/394048.
437763,328.
s.n.
1398.
14484.
27085024.
433950.
3825936.
OEM
128394048.
ANNUAL COST OF WASTE
RF.Pi.ACf MENT
12U140144.
TREATMENT
INTEREST
187633744.
TOTAL
4^7867776.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
to
CO
tn
COST RANGE
> 500000.
tooooo. TP
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
looooo. Tn
0. TO
500000.
100000.
50000.
toooo.
5000000.
1000000.
500000.
1 00000.
MAX
MIN
TOT
SO
933376.
0.
1289643.
47797.
*2*
13C23192.
473046.
49574.
9934.
MXIPUM
125909248C.
4SS6188.
9961 C8.
MINIMUM
525777.
100261.
50076.
10021.
820,
WERiGt
1625524.
2018^2.
69505,
24110.
5738.
1ISTR18UTION OF INVESTMENT REQUIREMENTS
99025.
MINIMUM
5 06 682 3 .
10) 1198.
502534.
100448.
mot.
AVERAGE
48269104.
2049698.
703312.
256577.
51302.
TOTAL
63395440.
3?501312.
14596003.
15888776.
2019706.
TOTAL
2172110336.
485778432.
202553776.
177550944.
8157022.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
*3*
*5*
*6*
*7*
*8*
*9*
5127.
2.
6?.
75604.
215.
11186.
21.
267.
350iC-0 .
526.
38936.
0.
185.
262304.
1226.
765.
0.
41.
25237.
60.
3344.
0.
409.
124759.
468.
83.
0.
39.
41 14.
11.
17886.
0.
371 .
303838.
970.
35
0
9
843
8
*10*
0.
0.
0.
0.
0.
S.D.
2092280.
97662.
14105.
10481 .
2579.
S.D.
186347264.
1064316.
138927.
107642.
28813.
NUMBER
39.
161.
210.
659.
352.
NUMBER
45.
237.
288.
692.
159.
*11*
0.
0.
0.
c.
0.
*12*
0.
0.
0.
0.
0.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL 0£M TREATMENT COSTS ($ 1000)
*«# *5* * 6* *7* *8*
MAX
HIM
AVE
TOT
so
1458.
0.
23.
9047.
94.
76.
0 .
1 .
1794.
3 .
3696.
0.
43 .
r>23R5.
147.
1390.
0.
10.
14523.
47.
3944.
0.
46.
28681.
203.
526.
0.
29.
8798.
59.
16.
0.
3.
287.
3.
2459.
0.
15.
12666.
97.
13
0
2
210
3
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
SI C CPOE.. . 2812
TOTAL NUMBER OF MANUFACTUP ING PI ANTS...
* NATIONAL TOTALS *
FLOW AT OBSEPVEC 1968 LEVEL
1968 PLOW CONDITIONS ( 1967 OCLLARSI
32
MANUFACTURING EMPIOYMFNT
FLOW (MGY)
TOTAL CAPITAt COST
TOTAL ANNUAL O&M COST
TOTAL ANNUAl COST
to
CO
CO
COST PANGF
> 500000.
100000. TO
5000C. TO
10000. TH
0. TO
COST RANGF
> 5000000.
1000000. Tn
500000. TO
100000. TO
o. Tn
500000
i ooooo
50000
10000
coooooc
I 000000
- 500000
100000
MAX
MIN
AVF
TOT
SO
*l*
0.
0.
0.
0.
0.
1 15.
3.
29.
935.
27.
MAXIMUM
?500.
8004.
2057240.
469985.
731255.
MIN IMUM
87.
37.
71390.
4702.
13769.
AVERAGE
670.
1374.
549775.
96U4.
165 )35.
TOTAL
21443.
43973.
17592784.
30 75645.
53C9928.
ANNUAL COST OF hASTE TREATMENT
GCM
3075645.
REPLACEMENT
INTEREST
879639. 1354643.
DISTRIBUTION OF 3 PER ATI
fftX IMUM
0.
469985.
79901.
49150.
8260.
KAXIWUM
0.
?777?72.
925409.
480076.
96377.
DISTRIBUTION
*3* *4*
135r'. 583.
65 . 4.
4n. loa.
132C6. 3451.
319. 131.
MINIMUM
0 .
112350.
54100 .
10791.
4702.
0 ISTRIBUTION OF I
MINIMUM
'0 .
1095032.
519952.
149029.
96377.
"OF TOTAL CAPITAL
*5* *6*
0. 0
0. 0
0. 0
0. 0
0. 0
ON AND MAINTENANCE CCST
AVERAGE
3 .
202253.
64472.
24099.
648 1 .
NVESTMENT REQUIREMENTS
AVERAGE
0.
1578608.
703789.
272580.
96377.
CCST FOR TREATMENT 1 $ 1000
* 7* * 8*
0 . 0 .
0. 0.
* > C! • 0 •
o . o .
0. 0.
TOTAL
5309927.
TOTAL
0.
2427040.
322358.
313290.
1296?.
TOTAL
0.
14207476.
5630314.
3816123.
96377.
)
*9* *10*
0 . J\v 0 .
0. ^6a^> 0.
0 . vj; <. 0.
0. v^ 0.
0. 0.
S.D.
689.
1781 .
474946.
LOTOrl.
167134.
*11*
0.
0.
0.
0.
0.
S.D.
0.
108243.
11478.
13829.
2516.
S.D.
0.
565400.
171031.
114156.
0.
NUMBER
0.
12.
5.
13.
2.
NUMBER
0.
9.
8.
14.
1.
*12*
0.
0.
* °-
0.
0.
MAX
MTN
AVF
TOT
SO
*?*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (* 1000)
*7* *8* *9*
0.
0.
0.
0.
0.
4 .
0.
I .
44.
1 .
404.
4.
82.
2631.
92.
62.
I.
13.
401 .
14.
0.
0.
0.
0.
0.
0.
:' •
0.
0.
0.
0 .
0.
0.
I.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0,
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
OR S.D. R6PP6SENTS STIVNDARD DEVT'VTION. THE DAT* DISTRIBUTION USfcD IS HIGHLY SKEWED.
-------
SIC CODE... 2813
TOTAL NUMBER OF MANUFACTURING PUNTS...
* NATIONAL TOTALS *
FLOW VT OBSERVED 1968 LtVfL
1968 FLOW CONDITIONS ( 1967 DCLLARS)
11 5
MANUFACTURING EMPLOYMFNT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
1500.
6566.
1777289.
387647.
613363.
MINIMUM
25.
32.
56201.
3850.
11003.
WERAGE
108.
448.
265667.
35890.
69630.
TOTAL
12435.
51493.
30551760.
4127399.
8007500.
S.O.
212.
745.
24192C.
47266.
77682.
ANNUAL COST OF HASTE
OEM RfPL4CFMENT
4127399. 1527587.
TREATMENT
INTEREST
2352484.
TOTAL
8007470.
to
CO
*3
COST RANGE
> 500000.
100000. TC
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000
1 00000
50000
10000
SOOOOOO
I 000000
500000
100000
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
MIN
AVE
TOT
SO
*1*
0.
0.
0.
0.
0.
*2*
99.
2 .
13.
1515,
14.
I MUM
0.
387647.
92225.
48158.
9681.
MAXIMUM
0.
23T5339.
921418.
498762.
98384.
MINIMUM
o.
104500.
S0330.
10149.
3850.
AVFR4GE
0 .
173053.
67343.
24258.
6244.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MIN IMUM
n.
1009629.
508033.
10?984 .
75871.
AVERAGE
0.
1468576 .
656234.
251071 .
T5732.
DISTRIBUTION OF TOT&L C1PIT4L COST FOR TREATMENT ($ 1000)
TOTAL
0.
121 1368.
1279526.
1455457.
181069.
TOTAL
0.
7342880.
13124681.
19834576.
943057.
S.D.
0.
100088.
1 50 89 .
10347.
1545.
S.D.
0.
563319.
127018.
106518.
7082.
NUMBER
0.
7.
19.
60.
29.
NUMBER
0.
5.
20.
79.
I I.
*3*
1199.
51 .
215.
24730.
173.
*4*
479.
3.
37.
4307.
58.
*5*
0.
0.
0.
0.
0.
*fr*
0.
0.
0.
0.
0.
*8*
0.
0.
*
0.
0.
0.
0 .
0 .
0.
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
AVE
TDT
SO
*1*
0.
0.
0.
0.
0.
*2*
3.
0 .
I .
98.
0.
DISTRIBUTION 3F ANN'IAL OGM TREATMENT CCSTS (* 1000)
*3* *4* *5* *6* *7* *8* *9*
333.
3.
30.
3502.
41.
51.
0.
5.
527.
6.
0.
0.
0.
0.
0.
0.
0.
0.
0.
r-.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
0.
0.
0.
0.
0 .
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS ST&NOARD DF.VI4TION. THE D&T* DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
sic cnnp... ?ei5
THT4L NUMBER OF MANUF-VC TUP ING PliNTS...
* NATIONAL TOTALS *
FLOW 4T QBSERVEC 196:i LEVEL
196H ROW CONDITIONS ( 1967 DOLLARS)
71
MflNUFUCTURING EMPLOYMTNT
FLOW ( Mr,Y )
TOTAL CAPI TAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL CCST
MAXIMUM
1000.
778.
809451.
67905.
I 70705.
26.
13.
67039.
2490.
U004.
AVfRiGf
179.
133.
22820 1.
12771.
41 ,'5?.
TCJTHL
12703.
9450.
16202286.
906728.
P964404.
S.O.
218.
163.
163053.
H934.
32436.
906728.
ANNUAI COST OF HASTE
PtPLUCFMENT
810114.
TREATMENT
INTEREST
1247575.
TOT&l
2964416.
OISTRIHUHON HF TPERATION AND MAINTENANCE CCST
to
CD
03
COST RANGF
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 500"000.
1000000. TO
500000. TO
100000. Tf>
0 . TO
500000
I 00000
50000
10000
^000000
IOOOPOO
500000
100000
0.
1.
6790'").
^°34C.
95 92.
MAX IMUM
0.
1092757.
MINIMUM
0 .
0.
67905 .
10136.
?490.
AVERAGE
19249.
5865.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
499580.
93687.
MINIMUM
0 .
10)2757.
518337.
1T1253 .
90503.
AVbRAGf
0 .
10927S7.
734565.
237035.
92095.
DISTRIBUTION OF TOT*L C&PIT4L CCST FOR TREV^MENT ($ 1000)
TOTAL
o.
0.
67905.
615956.
2,? 2 868.
TOTAL
0.
1092757.
6611087.
13985058.
184190.
V)»Y
•MN
». VF
TOT
SO
*1*
57.
6.
15.
1^56.
10.
*?*
51 .
3 *
12.
875.
11 .
*3*
?74.
21 .
6fl.
4936.
45.
*4*
83.
? .
14.
1029.
17.
*5*
51.
8.
21.
1437.
to.
*6*
0.
0.
0.
' • •
0.
*7*
•" 0-.
' 0.
0.
0.
0.
*8*
344
27
98
6969
71
*<}*
*10*
s.u.
0.
0.
0.
10718.
2398.
S.D.
0.
0,
149682.
99020.
2251.
NUMBER
u.
0.
1.
32.
38.
NUMBER
0.
1.
9.
59.
?.
*11 *
*12*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
u.
IflDTION OF ANNUAL 06M TREATMENT COSTS ($ 1003)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
T.'IT
<;D
10.
0.
2.
123.
? .
0.
1 .
43.
0.
16.
r .
3.
I 84 .
3.
6.
0.
1.
65.
1.
26.
1 .
5.
332.
5.
0
0
0
0
0
*11*
*12*
- ~j •
0 .
0.
0.
0.
9.
1 .
2.
160.
2.
0.
0.
0.
0.
il
*
0.
0.
0.
0.
0.
0.
u .
0 .
0.
0.
u.
0.
0.
0.
0.
$0 HR S.O. RFPRCSENTS STWJftRD DEVOTION. THE D HT 4 DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 2*16
TOTAL NUMBER OF MANOF <\CTIJR ING PL4NTS...
* NAT IHNAL TOTALS ''
I LOW AT OBSERVEC 196b LEVEL
FIOW CONDITIONS ( 1967 DCLLARS)
31
M4NUFACTURFMG EMPIOYMFNT
FtOW (MGV1
TOTAL CAPITA! COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
1450.
4978.
1677038.
3228/3.
4VER 500000.
IOCOOO. TO
^0000. TO
10000. TO
0. TO
COST RANGF
> 5000000.
1000000. TP
500000. TO
100000. TC
0. TO
*1*
MIN
AVh
TOT
so
500000.
ICOOOO.
*0000.
10000 .
^000000.
1000000.
5COOOC.
100000.
*?*
CAXP'UM
DISTRIBUTION Qf OPFRATICIV AND MAINTENAMCE CCST
AVERAGE
3^2873.
46541.
9224.
MAX IfUM
0.
??57250.
0 .
1053<55.
54640 .
10323.
8299.
144377.
6570?.
29P15.
8762.
463053.
n.
OISTPIBUTION OF INVESTMENT RFCJIPEMENTS
MINIMUM AVERAGE
o. o.
1071089. 1664169.
507P86. 724031.
149560. 319861.
o. n.
TOTAL
0.
1010640.
3^4220.
477039.
17523.
TOTAL
0.
33'>8339.
9412408.
4957774.
0.
DISTRIBUTION UF TOT !\L CAPITAL CCST FOR TREATMENT ($ 1000)
*(,* *7* * 8*
0.
0.
0.
0.
0.
93.
5.
22.
675.
17.
1159.
99.
333.
10310.
2 1C .
420
3
69
2125
78
0.
0.
0.
0.
0.
0.
0.
•
0.
0 .
0.
0.
0.
0.
*10*
S.D.
C.
79481 .
16707.
11887.
654.
S.D.
0.
838742.
174714.
109217.
0.
NUMBER
0.
7.
6.
16.
.
3 .
1 .
1 .
35.
1.
277.
7.
57.
1619.
52.
43.
1.
H.
745.
S.
0
0
o
0
*10*
*11*
*12*
n.
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
0.
0 .
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
G.
0.
OR S.D. REPRESENTS ST&NOARD DEVIATION. THE 0 ATH DISTRI6UTICN USFO IS HIGHLY SKEWED.
-------
sic CODE... ?ai«
TflTAL NUMBER OF MANUFACTURING PUNTS...
* NATIONAL TOTALS *
FLOW AT OBSERVtC 1968 LEVEL
1968 FLOW CONDITIONS < 1967 DCLIARS)
167
MUNUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANN'UAl COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 1 00000.
10000. TO 50000.
0. TO 10000.
to
C£>
° COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000300.
100000. TO 5COOOC.
0. TR 100000.
*1* *2*
M *X 933376. 5127.
WIN i?. 10.
AVE 7696. 216.
TOT 1285232. 36044. 1
SO 72560. ' 508.
MAXIMUM
10800.
469987.
1007273984.
13023192.
140946944.
OSM
64012960.;
DISTR
!»AX I MUM
13C231S2.
473046.
99113.
4S574.
0.
MINIMUM
SO.
97.
198915.
11049.
3631 I.
ANNUAL COST OF WASTE
REPLACFMENT
8851048C.
AVERAGE
592.
10490.
10600058.
38331 1.
1729508.
TREATMENT
INTEREST
13630608C.
TOTAL
98848.
1751805.
1770209792.
640 12960.
288827904.
TOTAL
238829440.
IBUTIQN OF TPERATIGN AND MAINTENANCE CCST
MINIMUM
525777.
11C740.
50412 .
11049.
0 .
AVFR4GE
2241562.
227575.
70156.
27733 .
0.
TOTAL
49314384.
10468463.
2455457.
1774901 .
0.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAX IMUM
1359819264.
4979810.
990374.
486630.
0.
DISTRIBUTION
*3* *4*
1 1186. 38936.
61 . 10.
646. 919.
078C3. 153556.
I 181 . 3417.
MINIMUM
5016304.
1003745.
517793.
2' 8536.
0.
OF TOTAL CAPITAL CCST
#5* *6*
765. 0.
19. 0.
90. 0.
15070. 0.
96 . 0 .
AVERAGE
687ci9888.
2123101 .
718549.
413984.
0.
FOK TREATMENT ($ 1000)
* 7* * 8* *
?".«>. 17886.
0. 86.
0. 1033.
0. 172498.
0. 1911.
TOTAL
22C1276672.
148617072.
29541968.
10349590.
0 .
*9«= *10*
0 . 0.
0. 0.
0. 0.
0 . 0.
0. 0.
S.D.
1446.
40829.
785S7472.
1190291.
11069070.
S.D.
2636974.
109466.
12885.
11578.
0.
s.o.
237681456.
1080052.
141648.
59033.
0.
NUMBER
22.
46.
35.
64.
< .
NUMBER
32.
70.
40.
25.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
*1*
*?*
DISTRIBUTION OF ANNUAL OEM TREATMENT CCSTS ($ 1000)
*5* *6* *7* *B* *9*
MAX
MIN
AVE
TOT
SO
1458.
1.
49.
8?07.
1 39.
76 .
1.
4 .
610.
7.
3696.
2.
103.
17278.
336.
1390.
1.
39.
6535.
127.
3944.
4.
133.
22206.
375.
0 .
c.
0 .
0.
0.
0 .
: ' *
0.
2459.
2.
55.
9176.
209.
0.
0,
0.
0.
0 .
*10*
0.
0.
0.
0.
0.
0.
0.
0 .
c.
0.
*12*
0.
0.
0.
0.
0.
OR S.O. REPRESENTS STiNO*RD DEVIATION. THF D»T* OISTP1BUTFCN USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOTAL NUMBER
2819
OF MANUFACTUR ING
PUNTS...
* NATIONAL TOTALS *
FLOW AT OBSERVEC 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
237
MANUFACTURING EMPLOYMENT
FLOW (MGYJ
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
14000.
29915.
5610433.
1515277.
?22780l.
MINIMUM
60.
36.
60178.
3900.
11825.
343.
1105.
436690.
72641.
128100.
TOTAL
81381.
261969.
103495520.
17215984.
30359664.
S.O.
1004.
3072.
636605.
157455.
237848.
OEM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
17215984.
5174775.
7969151.
TOTAL
30359888.
to
(£>
K-*
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
O.'TO
500000.
I 00000.
50000.
10000.
5000000.
1 000000.
500000;
100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
MAX I MUM
1515277.
435579.
98149.
4S344.
9739.
MAXIMUM
7574081.
4488472.
998783.
496353.
99427.
MINIMUM
532000.
103901.
51551 .
10148.
3900.
AVERAGE
909823.
190700.
70237.
25347.
7129.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
6674738.
1012242.
50C838.
103113.
81240.
AVERAGE
7124409.
1891769.
661770.
266084.
91661.
MAX
MIN
AVE
TOT
SO
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT (t IOOOJ
TOTAL
5458939.
4767500.
3792777.
2940222.
256632.
TOTAL
14248819.
47294240.
39044432.
38582192.
549967.
*2*
*3*
0.
0.
0.
0.
0.
308.
2.
23.
5379.
36.
3165.
55.
327.
77572.
384.
2137
3
87
20544
223
*5*
0.
0.
0.
0.
0.
*6«
0.
0.
0.
0.
0.
*7*
0.
0.
-•n
'..' •
0.
0.
0.
0.
0.
0.
0.
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.O.
358440.
95529.
12403.
10758.
1685.
S.O.
635910.
1053847.
109857.
111211.
7658.
NUMBER
6.
25.
54.
116.
36.
NUMBER
2.
25.
59.
145.
6.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SO
#1*
*2*
*3*
DISTRIBUTION OF ANNUAL 0£M TREATMENT CCSTS {$ IOOOJ
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
8.
G.
1 .
266.
1 .
1307.
3.
62.
14714.
136.
200.
0.
9.
2236.
21.
n.
a.
o.
o.
o.
o.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0 .
0.
0.
0.
0.
c.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA OISTRIEUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE... 282
TOTAL NUMBER CF MANUFACTURING PLANTS...
* NaMCN4L TOTALS *
FLDW AT OBSERVED 19*8 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
208
MANUFACTURING EMPLOYMENT
Fl OW (MGY)
TOTAL CAPITAL COST
T1TAL ANNUAL 06M COST
TDT-\L ANNUAL COST
MAXIMUM
8500.
27224.
1*111871.
10428*4.
2835C51.
MINIMUM
125.
57.
2f3268.
6894.
40329.
AVERVGE-
872.
1445.
1570537.
75354.
274812,
TOTAL
I 8146*).
100513.
326671872.
15673639.
57160800.
S.D.
1259.
3333.
1979835.
134931.
385243.
ANNUAL COST OF WASTE
06M REPl.ACEMFNT
15673639. 16333592.
TREATMENT
INTEREST
25153712.
TOTAL
57160928.
COST P
ANGE
> 500000.
100000
50000
10000
0
to
CO
*° COST R
. TO
. TO
. TO
. TO
ANGF.
500000.
100000.
50000.
10000.
> 5000000.
IOPOOOO
500000
100000
0
MAX
MIN
4VF.
TOT
SO
. TO
. TO
. TO
. TO
M*
0.
0.
0.
0.
0.
5000000.
1000000.
500000.
1COOOO.
*2*
1228
14
119
24789
173
DISTRIBUTION OF OPERATICK AND MAINTENANCE COST
MAXIMUM
IC42844.
440389.
99322.
47672.
9851.
MAXIMUM
17639824.
4956188.
987918.
4951C9.
0.
MINIMUM
555945.
110132.
5C076.
10021.
6894.
AVERAGE
744326.
185706.
69038.
23020.
8793.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MI N-I MUM
5066823.
1017640.
506701.
329085.
0.
AVERAGE
9703161.
2200427.
743081.
436582.
0.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
#3*
L7C6.
43.
226.
47032.
251.
*4*
4489.
12.
260.
54095.
565.
*5*
0.
0.
0.
0.
0.
*6*
3344.
124.
542.
112807.
512.
*7*
0.
0.
0.
0.
0.
*8*
3345.
71 .
423.
87950.
4Q4.
TOTAL
4465957.
5756886.
248535?.
2877522.
87934.
TOTAL
12M41 104.
215641856.
58703376.
7858479.
0.
0.
0.
0.
0.
0 .
*10*
0.
0.
0.
0.
0.
S.O.
1 71991 .
70994.
15138.
9364.
870.
S.O.
4094547.
1118356.
133363.
41229.
0.
NUMBER
6.
31.
36.
125.
10.
NUMBER
13.
9C.
79.
18.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
AVE
TOT
*i*
*2*
*3*
DISTRIBUTION OF ANNUAL G£M TRE«TMENT COSTS (* 1000)
*7* *8* *9*
0.
0.
0.
0.
0.
15.
1 .
2.
405 .
2 .
218.
1 .
14.
2968.
2R .
156.
I.
10.
2074.
20.
0.
0.
0.
0.
0.
526,
3.
39.
82 C7.
69.
0.
0.
0.
0.
0.
129.
L .
10.
2019.
16.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD CEVIATIQN. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOTAL NUMBER
283
Cf MANUFACTURING
PI ANTS...
* N&TIONAL TOTAtS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CUNOITICNS ( 1967 DOLLARS)
9 7
MANUFACTUPING EMPLOYMENT
FLOW (MGY»
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOTAL ANNUAL COST
MAXIMUM
10700.
1267232.
84012.
MINIMUM
212.
1 6.
81144.
2865.
13820.
AVERAGE
1082.
193.
321734.
157S7.
5661 8.
TOTAL
104929.
186B4.
3120B240.
1578464.
5491931.
S.D.
1578.
272.
273068.
17522.
52013.
ANNUAL COST OF MSTE TREATMENT
REPLACEMENT INTEREST
1528464.
1560411.
2403033.
TOTAL
5491908.
DISTRIBUTION OF OPERATICN Af^D MAINTENANCE COST
CO
CO
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1 000000. TO
500000. TO
100000. TC
0. TO
500000
100000
50000
10000
5000000
1000000
500000
100000
MIN
AVE
TOT
SD
*1*
0.
0.
0.
0.
0.
*2*
47.
?.
10,
1008.
10 ,
MAXIMUM
0.
0.
84012.
39926.
9934.
MINIMUM
0.
0.
6C749.
10491.
2865.
AVERAGE
0.
0 .
72873.
Z0713.
6C16.
DISTRIBUTION OF INVESTMENT REOll IRFMEN TS
0.
1584040.
935344.
49605S.
0.
MINIMUM
0.
1022296.
563122.
101430.
0.
4VERAGF
0.
1354751.
764246.
247737.
0,
niSTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
TOTAL
0.
0.
437237.
766379.
324858.
TOTAL
0.
9483259.
106qq446.
18827984.
0.
*3*
0.
0.
0.
n.
o.
*4*
225.
3.
36.
3483.
49.
*5*
0.
0.
0.
0.
0.
*6*
4C7.
38.
123.
11952.
87.
n.
0.
0.
0.
0.
553.
36 .
144.
13922.
120.
*9*
35.
2.
9.
843.
8.
*10*
0.
0.
0.
0.
0.
S.D.
0.
0.
8727.
<)539.
2004.
S.D.
0.
187128.
108763.
104622.
0.
0.
0.
0.
0.
0.
NUMBER
0.
0.
6.
37.
54.
NUMBER
0.
7.
14.
76.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SD
*t*
0.
0.
0.
0.
0.
*2*
2,
0.
1.
60 .
0.
*3*
0.
0.
0.
0.
0.
DISTRIBUTION OF ANNUAL 06M TRE»TMENT COSTS (t 1000 )
*4* *5* *6* *7* *8* *9*
17.
0.
3.
272.
4.
0.
0.
0.
0.
0.
34.
1.
6,
5S1,
7.
0.
0.
0.
0.
18 .
I .
4.
395.
4.
13.
0.
210.
3.
*10*
0.
0.
0.
0.
0.
*11*
0 .
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 28*
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NSTIOML TOT&LS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS I 1967 DOLLARS)
10 5
MANUFACTURING EMPLOYKENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOT4L 4NNU&L COST
MAXIMUM
4000.
869.
166448.
39344.
60483.
MINIMUM
38.
5.
888 1.
820.
1947.
AVERAGE
514.
59.
30255.
4549.
8391.
TOTAL
53930.
6166.
3176827.
477602.
881063.
S .0.
540.
104.
24270.
5384.
8439.
OEM
4NNUU COST OF hSSTE TREATMENT
RFPLACFMENT INTEREST
477602.
158 84 1 .
244616.
TOTAL
881059.
CO
CO
(*>•
COST RANGE
> 500000.
100000. TO
50000. TO
1 0000. TO
0. TO
COST R4NGE
> 5000000.
t 000000. TO
500000. TO
100000. Ttl
0. TO
500000,
100000
50000
10000
5000000,
I 0000 00
•500000
I 000 00
MAX
MIN
AVF
TOT
SO
*1*
0.
c.
0.
0.
0.
0.
0.
0 .
0.
0.
DISTRIBUTION OF OPERATION
MAXIMUM MINIMUM
0. 0.
0. 0.
0. 0.
39344. 10093.
9789. 820.
»I\D MAINTENANCE COST
AVERAGE
0.
0.
0.
20083.
3439.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
M&XIMUM
0.
0.
0.
208059.
95958.
MINIMUM
0.
0.
0.
10 8692.
11101 .
IWERAGE
0.
0.
0.
152716.
33269.
TOTAL
0.
0.
0.
140578.
337025.
TOTAL
0.
0.
0.
610864.
3^60177.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT (t 1000)
*5» *6* *7* *8* *9*
0.
0.
0.
0.
0.
36.
0.
3.
304.
5.
38.
4.
11.
1171.
6.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
92.
4.
16.
1701.
14.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
s.o.
0.
0.
0.
10751.
2296.
S.D.
0.
0.
0.
47489.
18454.
NUMBER
0.
0.
0.
7.
98.
NUMBER
0.
0.
0.
*7* *8* *9*
5.
0.
0.
46.
I.
31.
0.
3.
344.
4.
0.
0.
0.
G.
0.
0.
0.
0 .
0.
0.
4.
0.
1 .
88.
I.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
o.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD CEVIATIHN. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 285
TOTAL NUMBER CF MANUFACTURING PI ANTS...
* NSTICNM TOTALS *
FtOW AT OBSERVED 1968 LEVEL
FLOW CONDITIONS { 1967 DOLLARS)
81
MANUFACTURING EMPLOYMENT
Fl OW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAl OEM COST
TDT4L 4NNUM COST
MAXIMUM
28600.
4359.
1479333.
282736.
47061I.
MINIMUM
ISO.
?1.
42857.
2699.
8142.
AVERAGE
688.
187.
I 40 7? 6.
16309.
34181.
TOTAL
55692.
15146.
U398789.
1321017.
2768649.
S.D.
3153.
508.
175779.
33304.
55551.
OGM
1321017.
4NNU&L COST OF h»STt TREATMENT
REPLACEMENT INTEREST
569939.
877706.
TOTAL
2768662.
DISTRIBUTION OF OPERdTlCN UNO MAINTENANCE COST
•"
CO
CO
CN
COST RANGE
> 500000.
100000. TO
50000. TO
1 0000. TO
0. TO
COST RANGE
> 5000000.
I 000000. TO
500000. TO
100000. TO
0. TO
5COOOO
10000C
50000
10000
50COOOO
1000000
500000
100000
MAXIMUM
0.
232736.
79909.
47637.
S883.
MAXIMUM
0.
1649166.
627815.
470527.
36557.
MINIMUM
282736.
57576.
I 1053.
2699.
AVERAGh
0.
282736.
68?08.
22282.
6515.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMU"
0.
1849166.
520809.
10 1020.
5357?.
4VFR&GF
0.
1849166.
567526.
170508.
76955.
TOTAL
0.
282736.
205525.
467929.
3^4833.
TOTAL
0.
1849166.
17T2578.
8695916.
2000840.
S.D.
0.
0.
11174.
12084.
2281.
S.D.
C.
0.
54786.
82126.
11165.
NUMBER
0.
1.
3.
21.
56.
NUMBER
0.
1.
3.
51.
DISTRIBUTION OF T3TAL CAPITAL CCST FOR TREATMENT 1$ 1000)
MAX
MINI
AVF
TOT
SD
*1*
0.
0.
n.
o.
c.
*2*
82.
IS .
523,
10,
1038.
39.
119.
9599.
125.
- 359.
f •
16.
1277.
4(.
*5*
0.
0.
0.
0.
0.
0.
c.
0.
0.
0.
0.
0.
0.
*8*
0.
0.
0.
0.
0 .
*g*
0.
0.
0.
0.
o.
*1C*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
M4X
MIN
AVE
TCT
SD
*l*
0.
f> .
0.
0.
c.
3 .
0.
I.
49 .
0.
*3*
243.
14.
1108 .
29.
DISTRIBUTION OF 4NNUM. 06M TRESTMENT COSTS (* 1^00}
*4* *5* *6* *7* *8*
37.
0.
2.
165.
4.
a.
o.
o.
0.
0.
0.
0.
c.
c.
0.
0.
0 .
0.
0.
0 .
0.
0.
0.
0.
0 .
n.
0.
0.
0.
*1C*
0.
0.
0.
rt
^ •
0.
c.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. RfPRESENTS STANCARC CFVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CO OF... 286
TOTAL NUMBbP OF MANl'FACTUfi ING PLANTS...
* N4TIQN&L TOTALS *
FLHW AT OBSERVED 196:1 LEVEL
FLOW CONDI1 IONS t L967 ,)GLL4RS1
23
MANUFACTURING EMPLOYPHNT
FlOW (MGY)
TOTAL CAPITAL COST
TUTAL ANNUAl OEM COST
TOTHL MMNUM COST
MAXIMUM
2000.
2S46.
1264245.
135390.
7S5S49.
MINIMUM
100.
27.
8062 I.
38?B.
14066.
AVERAGE
176.
49 1.
3 "50786.
26974.
71524.
TOTAL
8654.
11290.
8068081.
620396.
1645042.
S .0.
488.
685.
295942.
31362.
68611.
OEM
IVNNU4L COST OF MSTE TREATMENT
REPIACEMENT INTEREST
620396.
403404.
621242.
TOTAL
1645042.
ro
CD
05
1
MAX
MIN
4V!f
TOT
SO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. Tf1
0. TO
COST RANGE
> 5000000.
000000. TO
500000. TO
100000. TO
0. TO
*!*
0.
0.
0.
0.
0.
500000.
100000.
50000.
10000.
5000000.
I 000000.
500000.
1 000 00.
*2*
92
4
2?
515
2?
DISTRIBUTION OF OPFRATIGI^ AND MMNTEN&NCE COST
MAXIMUM
0.
135390.
78584.
48366.
86S8.
MINIMUM
0.
135190.
72890.
10241.
38?8 .
AVERAGE
0.
135390.
75737.
21087.
6814.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
0.
1580306.
942502.
436438.
0.
MINIMUM
0.
1001878.
516006.
100776.
0.
&VER4GE
0.
1291.091.
700631.
219943.
0.
CISTR18UTION OF TOTAL CAPITAL CCST FOR TREATMENT (t 1000>
TOTAL
0.
135390.
151474.
285832.
47701.
TOTAL
0.
2582183.
4203783.
3299141.
0.
354.
28.
107.
246C.
83.
#4*
192.
2.
34.
784.
45.
ft 5*
68.
11 .
27.
626.
15.
*6*
0.
0.
0.
0.
0.
0.
0.
0.
0.
*a*
559.
36.
[ 60.
36R2.
132 .
*9*
0.
0.
0.
0.
n.
*io*
0.
0.
0.
0.
0.
S.D.
0.
0.
4026.
12665.
1836.
S.D.
0.
409011 .
175946.
86988.
0.
NUMBER
0.
1.
2.
13.
7.
NUMBER
0.
2.
6.
15.
0.
*11*
0.
0.
0.
c.
0.
*12*
0.
0.
0.
0.
0.
M4X
MIN
AVF
TOT
sn
*
0.
0.
o.
0.
c.
*2*
2.
2 .
1.
20.
1 .
*3*
3°.
1 .
7.
164.
9 .
*4*
15.
0.
3.
60.
3.
*5*
61
I
12
275
14
DISTRIBUTION OF UNNJ 4L GSM TR£«TMENT COSTS (* 10001
*7* *8* *9*
0.
0.
c.
0.
0.
0.
0.
0.
0.
0.
19 .
t.
4 .
102 .
4.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*u*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO DR S.D. RFPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
StC CODE... 287
TOTAL NUMBER OF MANUFACTURING PI ANTS,
* N4TICNAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
106
MANUFACTURING EMPLOYMENT
HOW (MGVJ
TOTAL CAPITAL COST
TOTAL ANNUAI OEM COST
TOTAL ANNUM COST
MAXIMUM
3900.
21233.
1399469.
^65204.
TC5919.
MINIMUM
70.
169.
25093.
AVtRAGE
?4fl.
1800.
320182.
71587.
112251.
TOTAL
26328.
190769.
33939328.
7588233.
11898561.
S.O.
425.
3374.
326726.
110882.
152009.
OEM
7588233.
ANNUM COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1696966.
2613326.
TOTAL
11898525.
to
CO
*3
COST RANGE
> 500000.
100000. TO
50000. TO
1 0000. TO
0. TO
COST RANGE
> 5000000.
i oooooo. TP
500000. TO
100000. TO
0. TO
500DOO
100OOO
50000
10000
500000C,
1000000
500000
loooor
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAX
M1N
AVE
TOT
SO
0.
0.
0.
0.
0.
*2*
0.
0,
0 ,
0.
0.
MAXIMUM
665204.
430331 .
99383.
47301.
0.
MAXIMUM
0.
2374336.
838016.
488135.
0.
MINI
655894.
100263.
51472.
12448,
0.
AVERAGE
660549.
21475? .
f.6009.
25596.
0.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
100 1198.
516767.
124366.
0.
4VER&GE
0.
1539074.
693561.
248703.
0 .
TOTAL
1321098.
3221276.
1254173.
1791700.
0.
TOTAL
0.
13851674.
'935614.
21637120.
0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
*4* *5* *6* *7* *8* *9*
934 .
50.
170.
18052.
164.
770.
7.
71.
7488.
129.
152.
17.
40.
4286.
25.
0.
0.
0.
0.
0.
25.
4114.
11 .
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
6626.
97033.
I 5481.
8471 .
0.
S.D.
0.
523259.
121040.
87644.
0.
*ll*
0.
c.
0 .
0.
0.
NUMBER
2.
15.
19.
70.
0.
NUMBt*
0.
9.
10.
87.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
so
*l*
0.
0.
0.
0.
0.
*2*
0.
1.
0.
0 .
0.
*3*
225.
3 .
2?.
2381 .
37.
DISTRIBUTICN OF ANNUAL OEM TRE«TMENT COSTS 1$ 1000)
*6* *7* * 8*
79.
1.
8.
616.
13.
345.
7.
39.
4104.
58.
0.
0.
0.
0.
0.
16.
I.
287.
0.
0.
0.
0 .
0.
0.
0.
0.
0 .
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 289
TOTAL NUMBER OF MANUFACTURING PLANTS...
* N&TICNM. TOTMS *
F13W AT OBSERVED 1968 LEVEL
l68 FLOW CONDITIONS ( 196T DOLLARSI
148
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAI 06M COST
TDT*L ANNUU COST
MAXIMUM
20000.
24805.
6171833.
1276857.
206067?.
MINIMUM
49.
40.
78678.
5919.
1591 I.
AVERAGE
769.
1071.
481759.
67260.
12R442.
T OT AL
I 13861.
158518.
71*00368.
19009472.
S.O.
2079.
2860.
748842.
146079.
242709.
4NNU&L COST OF W4STE
OEM REPLACEMENT
9954414. 3565018.
TRE&TMENT
INTEREST
5490125.
TOTAL
19009552.
DISTRIBUTION OF
EC
(£>
CO
COST RUNGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST R4NGF
> 5000000.
1 000000. TO
500000. TO
100000. TO
0. TO
500000
100000
50000
10000
5000000
1COOOOO
500000
1 000 00,
MAXIMUM
1276857.
450966.
97823.
49381.
9733.
MAXIMUM
7714791.
4136982.
9961C8.
490451.
98347.
MINIMUM
646666.
118726.
50187.
1 1228.
5919.
AND MAINTENANCE COST
AVfcRAGfc
945058.
72918.
23319.
8320 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5733658. 6724224.
10)1438. 1837403.
50?534. 665130.
120774. 252413.
98347. 08347.
TOTAL
2835175.
3220688.
1750040.
1982143.
166392.
TOTAL
1344R44Q.
29398448.
21949280.
24231648.
98347.
S.D.
316422 .
107597.
18370.
9930 .
1090.
S.D.
1400868.
966769.
146188.
81732.
0.
NUMUER
3.
16.
24.
85.
20.
NUMBER
2.
16.
33.
96.
1.
DISTRIBUTION (IF TDTAL CAPITAL COST FOR TREATMENT ($ 1000)
MAX
MIN
AVE
TOT
SO
*l*
522.
6.
23.
3373.
54.
»2*
319.
2.
23 .
3351 .
39.
2400.
43.
236.
34896.
3CP.
1590.
3.
67.
9869.
180.
*5*
105.
6.
18.
2650.
14.
*6*
0.
0.
c.
0.
0.
*7*
0.
0.
0.
0.
0.
*8*
1237.
19.
1 16.
17161.
159,
*9*
0.
0.
0.
0.
0 .
*10*
0.
0.
0.
0.
0.
*11*
0.
C.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
M4X
MIN
4VF
TOT.
so
*l*
84.
0.
5.
717.
10.
*2*
9.
D .
1 .
165.
I .
*3*
3 .
39.
5842.
92.
OISTRIBUTICN OF SNNUAL CEM TREATMENT COSTS <$ 1000)
+4* *5* *6* *7* *8* *9*
149.
0.
7.
1081.
17.
166.
I .
10.
1423.
20.
0.
0.
0.
c,
0.
0..
0.
0.
0.
0.
72 .
I.
5 ,
726.
8.
0 .
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
r .
0.
*12*
0.
0.
0.
0.
0.
so
OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC COOF... 29
TOTAL NUMBER OF MANUFACTURING PI ANTS...
« NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
1968 FL3W CONDITIONS ( 1967 DOLLARSI
334
MANUFACTURING EMPLOYPrNT
FLOW (MGYI
TOTAL CAPITAL COST
TOTAL ANNUAL C6M COST
TOTAL ANNUAl COST
M4XI MUM
10000.
25688.
67004336.
1983167.
10419546.
MINIMUM
27.
4.
26943.
1645.
5067.
AVERAGE
381.
1288.
3281673.
145015.
561800.
TOTAL
127318.
430310.
1096079,104.
48435088.
187641136.
S.O.
876.
3420.
8614211.
288365.
1376806.
ANNUAl COST OF HASTE
OEM REPLACEMENT
48435088. 54803936.
TREATMENT
INTEREST
84398048.
TOTAL
187637072.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CO
CO
SO
COST RANGE
> 500000.
100000. TP
50000. TO
1 0000 . TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
inoooo. TO
0. TC
500000
100000
50000
toooo
•5000000
ICOOOOO
500000
IOOOCO
MS XI HUM
1933167.
4R9763.
9814<3.
49549.
9821 .
MAXIMUM
837S54C8.
4695670.
907248.
478823.
96949.
MINIMUM
536277.
100704,
52172.
10142.
1645.
AVERAGE
1093362.
215932.
69958.
27045.
5240.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5063841 .
1013979.
508609.
1 1174.
33679.
AVERAGE
19188080.
2245529.
764070.
221139.
67634.
TOTAL
22960608.
17706448.
4757137.
2677496.
335365.
TOTAL
1036156416.
285182208.
30562784.
15258577.
2975907.
*2*
DISTRIBUTION OF TOTAL CAPITAL COST FCR TREATMENT ($ 100C)
*4* *5* *6* *7* *8*
MAX
M I N
%V F
TOT
SO
37601.
5.
99C.
330544.
4320.
419
0
34
11517
63
10.
fc'4069.
366.
1047.
0.
55.
185(3.
145.
35.
0.
11.
1103.
6.
0.
0.
0.
0.
0.
0.
u.
0.
n.
0 .
212.
0.
44.
4543.
39.
0.
0.
0.
<~l.
0.
*10*
0.
0.
0.
0.
0.
S.D.
476330.
100370.
13054.
12740.
2227.
S.D.
21070128.
1093817.
149051.
100932.
17505.
*H*
0 .
0.
0.
0 .
0.
NUMBER
21.
82.
68.
99.
64.
NUMBER
54.
127.
40.
69.
44.
*12*
26321.
150.
2796.
645776.
4474.
*1*
*2*
DISTRIBUTION OF ANN'IAL OGM TREATMENT COSTS (t 1000»
*4* *5* *6* *7* *8* *9*
MAX
MIN
-------
SIC CODE... 291
TOTAL NUMBER CF MANUFACTURING PLANTS.
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
231
MANUFACTURING EMPLOYMENT
Fl DW (M6Y»
TOTAL CAPITAL COST
TOTAL ANNUAl O6M COST
TOTHL ANNUAL COST
MAXIMUM
10000.
25688.
6700A336.
1983167.
10419*46.
MINIMUM
35.
32.
208226.
10333.
36984.
AVERAGE
470.
1821.
4690767.
204560.
800297.
TOTAL
108587.
420705.
1083567360.
47253344.
184868688.
S.O.
1028.
4000.
10048150.
329815.
1599691.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
47253344.
54178352.
83434640.
TOTAL
184866336.
DISTRIBUTION OF OPERATION A^0 MAINTENANCE COST
CJ
o
o
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1 000000. TO
MAX
MIN
AVE
TOT
SO
5000CO. TO
100000. TO
0. TO
*l*
37601.
14.
1426.
3294H.
5138.
500000.
1000OO.
50000.
10000.
50COOOO.
1000000.
500000.
i ooo oo.
*2*
419
3
48
It 084
72
MAXIMUM
1983167.
489763.
98149.
49549.
0.
MAXIMUM
83755408.
4895670.
997248.
478823.
0.
MINIMUM
536277.
100704.
52172.
10333.
0.
AVERAGE
1093362.
215932.
70344.
32585.
0 ,
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5063841.
1013979.
518609.
AVERAGE
19188080.
2245529.
778071.
"566490.
0.
TOTAL
22960608.
17706448.
4501984.
2085461.
0.
TOTAL
1036156416.
285182208.
28010560.
•U30860.
0.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT (* 1000)
*3*
2325.
40.
342.
79058.
4C8.
*4*
1047.
2.
79.
18232.
169.
*5*
n.
o.
0.
o.
0.
*6*
0.
0.
C.
0.
0.
*7*
0.
0.
0.
0.
0.
*8*
0.
0 .
0.
0.
0.
*q*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.O.
476330.
100370.
13287.
11873.
0.
S.D.
21070128.
1093817.
149509.
64U3.
0.
*11*
0.
0.
0.
0.
0.
NUMBER
21.
82.
64.
64.
0.
NUMBER
54.
127.
36.
14.
0.
*12*
26321.
150.
2796.
645776.
4474.
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (* 1000)
MAX
MIN
AVE
TOT
SO
501.
2.
50.
11613.
83.
*2*
8,
0.
1.
332,
*3*
498.
44.
10170.
PI .
65.
0.
6.
1309.
It .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 ,
0.
0.
0 ,
0.
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
911.
6.
103.
23829.
154.
S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
sic cooe... io
TDT4L NUMBER OF MANUFAC.TUR ING PLANTS...
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LFVEl
FLOW Ct)NOIT[QNS ( 1967 DOLLARSI
459
MANUFACTURING EMPLOY HF NT
FLOW (MGY)
TOT4L C4PITU COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MHXIMUM
20000.
4897.
2438279.
288072.
597733.
MINIMUM
'. 5.
3.
21613.
915.
3660.
AVERAGE
663.
134.
209045.
13206.
39? 5 5.
TOTAL
304302.
61498.
95951488.
6061358.
18247376.
S.D.
1295.
3ol.
187122.
19347.
42894.
ANNUAL COST OF WASTE
OEM REPLACEMENT
6061358. 4797574.
TREATMENT
INTEREST
738826C.
TOTAL
18247184.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CO
o
I—*
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TP
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TC
100000. TO
0. TO
500000
100000
50000
I 0000
5000000
1000000
500000
I 00000
MAX
MIN
AVE
TOT
SO
*(.*
*2*
f* XI MUM
0.
288072.
87816.
489C2.
9930.
MAXIMUM
0.
3047848.
943558.
498353.
99021.
MINIMUM
0.
149120.
50947.
I CO75.
915.
4VER4GE
0.
197247.
64382,
17263.
6211.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1018852.
502751 .
ni396.
27016.
AVERAGE
1564028.
678386.
230144.
78176.
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TREATMENT ($ 1000)
*3*
0.
0.
c.
0.
0.
187 .
1 .
11.
5023.
13.
358.
4.
34.
15614.
28.
354
0
10
4561
22
0.
0.
0.
0.
*6*
863.
12.
98.
450C4.
7?.
#7*
0.
0.
0.
0.
0.
676.
5,
56.
25748.
53.
TQT4L
0.
591740.
643819.
3210960.
1614950.
TOT4L
0.
10948202.
17638032.
87915104.
3439725.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
0.
78703.
10784.
8388.
2324.
S.O.
0.
753250.
148156.
86445.
16810.
NUMBER
0.
3.
10.
186.
260.
NUMBER
0.
7.
26.
382.
44.
*11*
0 .
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
WIN
AVE
TOT
SO
*1*
*2*
*3*
DISTRIBUTION OF ANN IAL OEM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
6.
C .
I .
359.
0 .
56.
0.
2 .
957.
4.
40.
0.
1 .
632.
3.
0.
0.
0.
0.
152.
0.
7.
3057.
10.
0.
0.
•1.
0.
0.
34.
0.
2.
1057.
2.
0.
0.
0.
0.
0.
•no*
o.
o.
o.
o.
o.
*u*
o.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUT1CN USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOTM. NUMBER
31
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
OF MANUFACTURING PLANTS... 215
MANUFACTURING EMPLOYMENT
FLOW (MGYI
TOTAL C&PIT4L COST
TOTAL ANNUAL OGM COST
TOTAL ANNUAL COST
M4XIMUM
3700.
63*9.
2553192.
214222.
456758.
MINIMA
6C.
6.
12165.
1061.
2606.
HVER4GE
476.
238.
403606.
20028.
71287.
TOTAL
102307.
51165.
86775264.
4306096.
15326736.
S.O.
504.
505.
466767.
26394.
82708.
OGM
4306096.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
4T38762.
6681692.
TOTAL
15326550.
o
CO
COST RANGE
> 500000.
100000. Tfl
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000.
I0000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100300.
MAX
MIN
WE
TOT
SD
*1*
*2*
M&XIMUM
0.
214222.
94026.
46835.
9739.
MAXIMUM
0.
3191490.
965007.
494153.
61739.
MINIMUM
0.
U413L.
50403.
IC076.
1061.
AVERAGE
150792.
67894.
22725.
2617.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1012275.
517147.
109181 .
15206.
AVERAGE
a.
1531969.
695352.
314806.
29569.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000»
TOTAL
0.
603166.
1018414.
2454297.
230268.
TOTAL
0.
55150896.
36158288.
14795888.
2365488.
*4*
*5*
0.
0.
0.
0.
0.
279.
22.
75.
8221.
50.
1057.
127.
345.
37899.
185.
609.
21 .
115.
12635.
108.
99
0
14
1431
14
*6*
0.
0.
0.
n.
0.
*7*
0.
0.
0.
0.
0.
720.
8.
124.
26588.
121.
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.O.
0.
43870.
12902.
9833.
2152.
S.O.
0.
578229.
128973.
119670.
9246.
NUMBER
0.
4.
15.
108.
88.
NUMBER
0.
36.
52.
47.
80.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
L*
0.
0.
0.
0.
0.
*2*
4.
1 .
I .
160.
1 .
*3*
101.
s .
21 .
2269.
18.
*4*
24.
I.
5.
536.
4.
*5*
175
0
7
721
19
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (t 1000J
*6* *7* *8* *9*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
39.
I .
3.
619.
3.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
*12*
0.
0.
0.
0.
0.
SD
OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOTAL NUMBER
3U
OF MANUFACTURING PUNTS...
* NATIONAL TOTALS *
FLOW 4T OBSERVED 1968 L6VEI
1«68 FLOW CONDITIONS t 1967 DCLtARS)
110
MANUFACTURING EMPLOYMENT
FLOW (MGV) *
TOTAL CAPITAL COST
TOTAL ANNUAL OGM COST
TOTAL ANNUAL COST
MAXIMUM
I 500.
1583.
2553192.
142311.
456758.
MINIMUM
60.
55.
238052.
8143.
38791.
AVERAGE
189.
287.
726152.
30563.
122784.
TOT&L
20762.
31568.
79876688.
3361888.
13506291.
S.D.
181.
284.
450219.
25032.
81988.
0£M
ANNUAL COST OF WASTE TREATMENT
REPL4CEMENT INTEREST
3361888.
3993634.
6150501.
TOT4L
13506223.
COST RANGE
>. 500000.
noooo. Tn
50000. TO
10000. TO
0. TO
CO
o
W j>COST RANGE
> 5000000.
1 000000. TO
500000. TO
100000. TO
0. TO
500000.
i ooooo.
50000.
10000.
*000000.
I 000000.
500000.
100000.
DISTRIBUTION
PAX I MUM
0.
142311.
94026.
46835.
9739.
OF
OPERATION AKD MAINTENANCE CCST
AVERAGE
0. 0 .
114131 . 129648.
50403. 68971.
10107. 22978.
8143. 9040.
0 ISTfUBUTION OF INVESTMENT REQUIREMENTS
KAX I MUM
0.
965007.
477357.
0.
MIN 1*1 U"
0.
1012275.
517147.
297564.
0.
AVERAGE
0.
1546522.
695352.
415638 .
0.
TOTAL
0.
388944.
896625.
2022090.
54239.
TOTAL
0.
54128288 .
36158288.
9559665.
0 .
M4X
MIN
AVE
TOT
sn
*i*
0.
0.
0.
0.
0.
DISTRIBUTION OF TOT&L C4PIT&L CCST FOR TREATMENT ($ 1000)
*2*
279.
22.
75.
82?1 .
50.
*3*
1057.
127.
345.
IP5.
*4*
609.
21.
115.
1263-5.
108.
*5*
0.
0.
c.
0.
0.
*6*
O.
0.
0 .
n f
0.
*7*
0.
0.
*8*
608 .
68.
192 .
21122 .
108.
0 .
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
0.
14305,
12956.
10394.
676.
S.O.
O.
579943.
128973.
431 83.
0.
*11*
c.
c.
0.
c.
0.
NUMBER
0.
3.
13.
8fl.
6.
NUMBER
0.
35.
52.
23.
0.
*12*
0.
0.
0.
0.
0.
WAX
M IN
AVE
TOT
SO
*1*
C.
0.
0 .
0.
0.
*2*
4.
1 .
I .
160.
1 .
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS ($ 1000)
*4* *s* *6< *7* *8* *9*
101 .
e;.
21 .
2269.
1?.
24.
1.
•5.
536.
4.
0.
0.
0.
0.
0 ,
0.
0.
0.
0.
0.
13.
1 .
4.
396.
2 .
0.
0.
0.
0.
0 ,
*10*
0.
0.
n.
0.
0.
*11*
0.
0.
0 .
0.
0.
*12*
0.
0.
c.
0.
0.
SD OR S.O. REPRESENTS ST&ND4RP DEVI4TION. THE D4T4 DlSTRI BUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOTM. NUMBER
32
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
OF MANUFSCTURING PLANTS... 945
MANUFACTURING EMPLOYMENT
FLOW (MGY) .
TOTAL CAPITAL COST
* TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 1 0000.
W
O
** COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
1POOOO. TO 500000.
0. TO 100000.
*l* *2*
MAX 0 . 0 .
MIN P. 0.
AVF 0. 0.
TOT 0 . 0 .
SO 0. 0.
MAXIMUM
8000.
8698.
3050324.
670264.
1057655.
0£M
2 1267280.
OISTR
HXIMUM
670264.
499543.
95850.
49749.
9944.
MI NIMUM
50.
5.
20021.
888.
3456.
ANNUAL COST OF WASTE
REPLACEMENT
9113205.
WER4GE
345.
254.
1928Y2.
22505.
46998.
TREATMENT
INTEREST
14034330.
TOTAL
325708.
239949.
182.264128.
21267280.
44412640.
TOTAL
44414800
IBUTION OF OPERATION AND MAINTENANCE CCST
MINIMUM
670264.
10 1703.
52885.
I 0058.
888 .
AVERAGE
670264 .
185117.
72392.
213^6.
5095.
TOTAL
670264.
6108868.
2606103.
9758208.
2124495.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
381 29C5.
969729.
49485?.
99477.
DISTRIBUTION
*3* *4*
1763. 1287.
17. 1.
144. 36.
136309. 34366.
157. 88.
MINIMUM
0.
1066433.
503048.
10T554.
25026.
OF TOTAL CAPITAL CCST
*5* *6*
0. 322.
0. 13.
0. • 63.
0. 11588.
0. 50.
AVtRAGE
0.
1673394.
672200.
'214824.
63058.
FOR TREATMENT I $ 1000
*7* *8*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
TOTAL
0.
43508256.
34282192.
134909472 .
15133957.
*9* *10*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
s.o.
586.
610.
246987.
44207.
75204.
S.D.
0.
93969.
140C9.
9778.
2615.
S.D.
0.
716224.
143998.
90655.
21531.
NUMBER
I.
33.
36.
458.
417.
NUMBER
0.
26.
51.
623.
240.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
AVF
TOT
SD
0.
0.
0.
0.
0.
*2*
0.
0 .
0 .
p.
0 .
*3*
539.
1.
1R .
16671.
35.
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (t 1000)
*4* *5* *t* *7* *8* *9*
131.
0.
4.
3949.
9.
o.
o.
0.
34 .
0.
4.
648.
5.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
w •
0.
0.
0.
*12*
0.
0.
0.
t °-
fe 0.
SO OR S.O. REPRESENTS STANDARD OfVIATION. THE DATA DISTRIBUTION USfcO IS HIGHLY SKEWED.
-------
SIC C00fc... VI
TPT4L NUMBER DF MANIJF \(. TUP ING PLANTS.
* NAT IONAL TOTALS *
CLOW AT OBSERVfcC 1968 LfcVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
MANUFACTURING EMPLOYMENT
FlOW |MT,Y)
THTM. CUPTTfiL COST
TOTAL ANNUAL C£M COST
TOTAL ANNUAL COST
MUM
3000.
1578.
1143502.
172011.
MI
250.
122.
203182.
16177.
41981.
1VFR4CE
'13 I.
507.
474348.
56958.
TOTAL
21408.
11653.
10921500.
HI 0045.
2697071.
S.O.
705.
405.
255864.
41527.
73930.
0£M
ANNUAL COST OF WASTE TREATMENT
REPL4CEMENT INTEREST
ni.0045.
546C75.
840955.
TOTAL
2697074.
OJ
o
en
COST RANGE
> 500000.
100000. TO
C0000. TO
10000. TO
0. TO
CPST RANGE
> 5000000.
I 000000. TO
500000. TO
100000. TO
0. TO
500000.
100000.
50000.
I 0000.
5000000.
1000000.
5COOOO.
1 00000.
MAX
M[M
!*VF.
TOT
SD
*t*
o'.
0.
0.
0.
0.
0 ,
0.
0,
0.
0.
DISTRIBUTION OF OPERATION
MXIMUM MINIMUM
0. 0.
172131. 156321.
95850. 52885.
49265. 16177.
0. 0 .
AND MAINTENANCE COST
0 .
164176.
76954.
3 1644.
0.
0.
1429377.
962863.
0.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
1303361. 1366369.
505899. 701937.
253977. 354524.
0. 0.
TOT4L
0.
328352.
538676.
443020.
0.
TOTU
0.
2732738.
7019372.
3899766.
0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 10001
*4* *5* *6* *7* *8* *9*
589.
I 13.
255.
130.
232.
17.
71.
1640.
58.
0.
0.
0.
0.
0.
322.
7? .
149.
3423.
68.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0 .
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
0.
11109.
14476.
11759.
0.
S.O.
0.
89106.
165539.
74431.
0.
0 .
0.
0.
0.
0.
NUMBER
0.
2.
7.
14.
0.
NUMBER
0.
2.
10.
11.
0.
*12*
0.
0.
0.
0.
0.
"AX
AVF
TOT
so
o.
o.
o.
o.
0.
0.
0 .
0.
p.
0 .
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS (* 1000)
*3* *4* *S* * 6* *7* * 8* *g*
111 .
10.
36.
838.
27.
27.
2.
9.
200.
7.
0.
0.
6.
o.
o.
34.
4.
12.
272.
8.
0.
0.
0.
0 .
0
0.
0.
0
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
n.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA OISTRI8UTICN USED IS HIGHLY SKEWED.
-------
SIC COOE... 322
TOTAL NUMBER flF MANUF4CTUPING PtANTS...
* NATIONAL TOTAIS *
FLOW AT OBSERVED 1968 LEVEL
1968 FL3W CONDITIONS ( 1967 DOLLARS)
125
MANUFACTURING EMPLOYMENT
Ft OH (MGY)
TOT&L C&PITU COST
TOTAL ANNUAL OGM COST
TOTAL ANNUAL COST
MAXIMUM
8000.
974138.
14423*.
267953.
MINIMU«
17C.
5.
30675.
888.
4784.
4VERIVGE
766.
77.
136097.
10238.
27522.
TOTAL
95739.
9666.
170 12144.
1279762.
3440287.
S.D.
969.
145.
113626.
L4922.
29127.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1279762.
850607.
1309934.
TOTAL
3440303.
CO
O
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
50 00 CO. TO
100000. TO
0. TO
MAX
HIM
4V E
TOT
S3
500000.
100000.
50000.
I 0000.
50COOOO.
1000000.
500000.
iooooo.
*l*
0.
0.
0.
0.
c.
*2*
0 ,
0.
0.
0 .
0.
MAXIMUM
0.
144238.
55121.
44934.
9741 .
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MINIMUM 4VERAGE
0. 0.
144738. 144238.
55121. 55121.
IC287. 18590.
888
5188.
MAXIMUM
0.
1217673.
702848.
468175.
99243.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1217673.
511217.
103263.
38343.
AVERAGE
0 .
1217673.
607033.
185759.
76356.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
*«5* *6* *7* *8* *
504.
17.
76.
9475.
60.
TOTW-
0.
144238.
55121.
613471.
466943.
TOTAL
0.
1217673.
1214065.
16161010.
2672463.
194.
I.
11.
1406.
0.
0.
0.
0.
276.
13.
49.
6131.
34.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
•"1 ^
*10*
0.
0.
0.
0.
0.
S.O.
0.
0.
0.
8999.
2256.
S.O.
0.
0.
135505.
88007.
16180.
NUMBER
0.
I.
1.
33.
90.
NUMBER
0.
I.
2.
87.
35.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
*VE
TOT
sn
*1*
0.
Or,
0.
0.
0.
*2*
0.
0 .
0.
0.
0 .
*3*
I .
6 .
8C7.
10.
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS (J 1000>
*4* *5* *6* *7* *8* *9*
22.
0.
I.
186.
2.
3.
0.
0.
0.
0.
29.
0.
2.
?87,
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0 .
*12*
0.
0.
0.
0.
0.
Sfl OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USfcD IS HIGHLY SKEWED.
-------
SIC CODE... 323
TOTAL NUMBER OF MANUFACTUPING PtANTS.
* NATIONAL TOTALS *
FLOW AT OBSERVEC 1968 LEVEI
1968 FLOW CONDITIONS < 1967 DOLLARS)
36
MANUFACTURING
fl OW (MGYI
TOTH CIMMTU
TOTAL ANNUAt
TOTAL ANNUAL
EMPlCYPtNT
COST
O&M COST
COST
M4XIMUM
1100.
344.
413912.
49 197 .
101764.
MINIMUM
112.
14.
5583 I.
2618.
9709.
AVERAGE
259.
76.
I 55050.
10924.
30616.
TOTAL
9333.
2735.
5581804.
393270.
1102160.
S.D.
199.
61.
71244.
8370.
17218.
393270.
ANNUAL COST OF WASTE
REPLACEMENT
279090.
Tf EATMENT
INTEREST
429799.
TOTAL
1102158.
O
•4
COST R4NGF
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
5COOOO.
100000.
50000,
10000.
COST RANGE
> 5000000.
1000000. TO *OOOOOC.
5000CO. TO 1000000.
100000. TO 500000.
0. TO 1COOOO.
P\XI HUM
0.
0.
0.
49197.
933?.
MAXIMUM
C.
0.
M7390.
396218.
94142.
MINIMUM
0.
0 .
0.
IOU6.
2618 .
1WER4GE
0.
0.
0 .
17729.
6594.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
0. 0.
517390. 517390.
102873. 190786.
69788. 91965.
TOT AL
0.
0.
0.
248209.
145061.
TOT4L
0.
0.
517390-
6295939.
1*3930.
S.D.
0.
0.
0.
10115.
1703.
S.D.
0.
0.
0.
67836.
17221.
NUMBER
0.
0.
0.
14.
22.
NUMBER
0.
0,
1.
33.
2.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000 I
*2*
MIN
&VE
TOT
SO
0 .
0.
0.
0.
0.
0 .
O.
0.
0.
*3*
22ft.
32.
87.
52.
?.
12.
423.
30.
*5*
0.
0.
0.
0.
0.
136.
22.
56.
2033.
23.
*7*
0.
0.
0.
v).
0.
*8*
0.
0.
0.
0.
0 .
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*U*
0 .
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
"TM
AVE
TOT
SD
*1*
0.
0.
0.
0.
0.
*2*
C,
f
0,
0
*?*
31 .
2.
7 .
247.
DISTRIBUTION OF ANN'J AL OEM TREATMENT COSTS
-------
SFC CODE... 324
TDT&L NUMBER OF M4NUFHCTUPING PI ANTS.
* NATIONAL TOTALS *
FLOW AT r'BSERVEO 1968 LEVfcl
L968 FLTW CONDITIONS ( L967 DnLLARSI
149
MANUFACTURING EMPLOYMENT
Fl OW ( MGY»
TQTM. CAP IT SI COST
TOTAL ANNUAL 0£M COST
TOTAL ANNUAt COST
COST RANGE
> 500000.
loooon. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 1 0000.
CO
o
°° COST RANGF
> 5000000.
1000000. TO 5000000.
500000. TO 1COOOOO.
100000. TO 500000.
0. TO 100000.
*i* *2*
MAX 0 . 0 .
MIN o. o.
*ve o. o.
TOT 0. 0.
SO 0. 0.
MAXIMUM
1000.
1776.
775784.
114616.
213141.
OEM
3609271.
DISTR
M&XTMUM
0.
U4616.
S3842.
48126.
9535.
MI NIMUM
75.
44.
68417.
5272.
13995.
ANNUAL COST OF WASTE
REPLACEMENT
1556825.
HVER4GE
197.
261.
208970.
24223.
50763.
TREATMENT
INTEREST
239751C.
TOTAL
29415.
38959.
31136512.
3609271.
7563651.
TOTAL
7563606.
IBUTION OF OPERATION ANO MAINTENANCE COST
MINIMUM
0.
102218.
52982.
1C058.
527? .
AVERAGE
0 .
109307.
64176.
22003.
7089.
TOTAL
0.
327920.
513408.
2640354.
127598.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
CAXIMUM
0.
0.
969729.
492533.
97600.
DISTRI8UTION
*3* *«*
548. ?28.
*2. 6.
17?. 37.
25558. 5579.
85. 32.
MINIMUM
0.
0.
503048.
100554.
85521.
OF TOTAL CAP! TAL CCST
*5* *6*
0. 0.
0. 0.
0. 0.
0.. 0.
0. 0.
AVERAGE.
a.
0.
642325.
236022.
92836.
FOR TREATMENT I* 1000
*7* *8*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
TOTAL
0.
0.
7065579.
31390912.
464181.
)
*9* *10*
0. 0.
0. 0.
0 . 0.
0. 0.
0. 0.
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS ($ 1000)
*1* *2*
MAX 0. 0.
MIN 0. 0.
AVF 0. 0.
TOT 0. 0.
SO 0 . 0 .
*3* *4*
92. 22.
4. I.
20. 5.
2920. 689.
15. 4.
*5* *6*
0. 0.
0. 0.
0. 0.
0. . 0. ",
0. 0.
*7* *8*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
*9* *10*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
S.D.
135.
226.
116810.
18617.
33286.
S.D.
0.
6388.
11734.
9105.
1179.
S.O.
0.
0.
159940.
90267.
5509.
NUMBER
i
A»
120\
18.\
NUMBER
0.
0.
11 .
133.
5.
*u*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
no <:. n.
REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 325
TOTM NUMBER OF MANUFACTURING PIANTS.
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
77
MANUFACTURING EMPLOYNFNT
FLOW (MGY)
TOTHL C4PIT5L COST
TOTAL ANNUAL C£M COST
TOTAL ANNUAL COST
M4X1MUM
2000.
97.
1267C3.
0743.
25834.
MINIMUM
13C.
6.
?002l.
90 7.
3456.
AVERAGE
300.
24.
42893.
2738.
P185.
TOTAL
23100.
1832.
3302750.
210788.
630240.
S.D.
280.
21.
22646.
2047.
4907.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
210788.
165137.
254312.
TOTAL
630237.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
00
O
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TP
0. TO
COST RANGE
> 5000000.
1000000. TP
5000CO. TO
100000. TO
0. TO
500000
100000
50000
10000
5000000
I 000000
500000
100000
MAX
MIN
&VE
TOT
SO
0.
0.
0.
0.
0.
*2*
C&XIMUM
0.
0.
0.
0.
9743.
MAXIMUM
0.
0.
0.
158379.
39478.
MINIMUM
0.
0.
0.
0.
907.
4VER&GE
0.
0.
0 .
r).
2738.
DISTRIBUTION Of INVESTMENT REQUIREMENTS
MINIMUM
0.
0.
0 .
103965.
25026.
AVERAGE
0.
0.
0.
123727.
45487.
TOT*L
0.
0.
0.
0.
210788.
TOTAL
o.
o.
o.
989813.
3138637.
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TREATMENT <$ 100:' )
*5* *6* *7* *8*
0 .
0.
c.
0 .
0.
1 11.
19.
39.
3037.
20.
15.
I.
3.
266.
3.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
s.o.
0.
0.
0.
0.
2047.
S.D.
0.
0.
0.
17441.
14795.
NUMBER
0.
0.
0.
0.
77.
NUMBER
0.
0.
0.
8.
69.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SO
#1*
0.
0.
0.
0.
0.
*2*
0.
0.
0.
0.
0 .
*3*
8.
1 .
2 .
17?.
2.
DISTRIBUTION Of ANNUAL 0£M TREATMENT COSTS (* 1000)
*4* *5* *6* *7* *8* *9*
2.
0.
0.
38.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0 .
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOT HI. NUMBER
326
OF M4NUF4CTUR ING PLANTS...
* NATIONAL TOTALS *
FLOW VT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( L967 DOLLARS)
47
MANUFACTURING EMPLOYMENT
FLOW JMGYJ
TOT*L ^PITHL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
1500.
161.
146377.
13370.
30409.
MI NIMUM
8C.
6.
20768.
943.
3601.
AVERAGE
433.
35.
56446.
4216.
11384.
TOTAL
20364.
1665.
2652975.
198129.
535058.
S.D.
407.
32.
30832.
3190.
7073.
ANNUAL COST OF WASTE
OCM REPLACEMENT
198129. 132649.
TREATMENT
INTEREST
204279.
TOTAL
535057.
COST RANGE
> 5000000.
1000000. TO 5000000.
5000CO. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTR IBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
1COOOO.
50000.
t 0000.
MAXIMUM
0.
0.
0.
13370.
9397.
MINIMUM
0.
0.
0.
10901.
943.
AVERAGE
0.
0.
0.
12030.
3683.
TOTAL
0.
0.
0.
36091 .
162038.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
MINIMUM
AVERAGE
0.
0.
0.
182972.
87615.
0.
0.
0 .
105676.
25960.
0.
0.
0.
128814.
50585.
OISTR IBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000 »
TOTAL
0.
0.
0.
1545762.
1770462.
*3*
*4*
*5*
*6*
*7*
*8*
*9*
*10*
*11*
S.D.
0.
0.
0.
1248.
2502.
S.D.
0.
0.
0.
21848.
I 5706 .
NUMBER
0.
0.
0.
3.
44.
NUMBER
0.
0.
0.
12.
35.
*12*
MAX
MIN
AVE
TOT
SO
0.
0.
0.
0.
0.
0 .
0.
0.
L +
0.
125.
20.
51.
2406.
26.
21.
1.
5.
247.
5.
0.
0.
0.
0.
••>
•J *
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
*1*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS t$ 10001
*8* *9*
*10*
so
OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
*lt*
*12*
MAX
MIN
4VF
TOT
SO
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
11.
1 .
3.
162.
3.
3.
0.
1.
36.
I.
3.
0.
0.
0.
0.
0 . 0 .
0. 0.
0. 0.
0. 0.
0. 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
-------
SIC CODE... 32?
TOTAt NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS < 1967 DOLLARS)
280
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOT4L C^PIT^L COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
700.
1979.
876357.
120928.
MINIMUM
•5C.
12.
30360.
1697.
5553.
AVERAGE
148.
214.
177997.
20096.
42702.
TOTAL
41376.
59846.
49839120.
5626862.
11956618.
S.D.
102.
224.
121318.
18842.
34115.
OEM
ANNUAI COST OF WASTE TREATMENT
REPLACEMENT INTEREST
5676862.
2491955.
383761C.
TOTAL
11956427.
Ctf
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000.
I 0000.
COST RANGE
> 5OOOOOO.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MIN
4V E
TRT
*1*
0.
0.
0.
0.
0.
*2*
0 ,
0.
0.
0 ,
0,
MAXIMUM
0.
120928.
90024.
46792.
9941.
FA XT MUM
0.
1095446.
874562.
4<3485?.
99127.
MINIMUM
0.
101703.
52945.
10220.
1697 .
4VER4GE
0.
112898.
72796.
20728.
6204.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1095446.
503565.
103919.
37950.
AVERAGE
0.
1095446.
676983.
220672.
73897.
TOT4L
0.
451590.
800758.
3896851.
477704.
TOTAL
0.
1095446.
9477756.
48327200.
3399265.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMtNT It 1000)
*3# *4* *5* *6* *7* *8* *9*
612.
29.
147.
4125H.
89.
264.
2.
31.
8r>89.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
0.
8154.
15069.
9311 .
2399.
S.D.
0.
0.
122667.
83905.
18413.
*11*
0 .
0.
0.
0 .
0.
NUMBER
0.
4.
11.
188.
77.
NUMBER
0.
1.
14.
219.
46.
*12*
0.
0.
0.
0.
0.
MAX
MINI
\Wr
TOT
SO
0.
0.
n.
o.
o.
0.
0 .
0.
0.
n .
*3*
97.
1 .
If..
4*155.
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS It 1000)
*/(.* *5* * 6* *7* *8*
24.
0.
4.
1C7?.
A.
o.
o.
o.
o.
0.
0.
0.
0.
0.
o.
o.
o.
o.
0.
0.
0.
0.
0.
0.
0.
n.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*u*
0.
0 .
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESFNTS STANDARD DEVIATION. THE DATA DISTfUBUTICN USED IS HIGHLY SKEWED,
-------
SIC CnOE... 328
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FLOW AT PBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
38
MANUFACTURING EMPLOYMENT
FLOW
TOTfkL C4PITSL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
500.
577.
3476CI.
35764.
79909.
MINIMUM
54.
22.
44 7', 4.
2406.
8069.
AVERAGE
139.
135.
130963.
11582.
28214.
TOTAL
5272.
5117.
4976589.
440121.
1072149.
5.0.
10 I.
117.
68577.
7679.
16341.
OSM
ANNUAL COST OF HASTE TREATMENT
REPLACEMENT INTEREST
440121.
248829.
383197.
TOTAL
1072147.
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
CO
M
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
PA XI MUM
0.
0.
0.
35764.
9944.
f AX I MUM
0.
0.
0.
4345C1.
99477.
MINIMUM
0.
0 .
0.
10932.
2406.
AVER4GE
0.
0.
0.
19439.
6999.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
AVER4GE
0.
0.
0.
100635.
5 59 30 .
0.
0.
0.
185462.
82109.
TOTAL
0.
0.
0.
272148.
167973-
TOTAL
0.
0.
0.
5563872.
656870.
S.D.
0.
0.
0.
7388.
2125.
S.D.
0.
0.
0.
83677.
13948.
NUMBER
0.
0.
0.
14.
24.
NUMBER
0.
0.
0.
30.
8.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT <$ 1000)
*2*
*3*
MAX
MIN
4VF
TOT
SO
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
272.
41.
112.
4256.
53.
75.
3.
19.
721.
16.
0.
0.
0.
0.
0.
*6*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*8*
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
DISTRIBUTION OF ANNJAL OSM TREATMENT COSTS It 1000)
MAX
MIN
AVE
TOT
SO
*1*
o.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
*3*
29.
357.
6.
7.
0.
2.
83.
1.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
so
OR S.D. RFPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 329
TOTM. NUMBER OF MANUFACTURING PLANTS..,
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
196H FLOW CONDITIONS ( 1967 DOLLARS)
170
CO
M
CO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOT4L C4PIT4L COST
TOTAL ANNUAL GSM COST
TOTAL ANNUAL COST
COST RANGF
> 500000.
100000. TO 500000.
50000. TO 1COOOO.
10000. TO 50000.
0. TO 1 0000.
MHXIMUM
6800.
8698.
3050374.
670264.
1057655.
OEM
B199765.
OISTR
MAXIMUM
670244.
499543.
95351.
49749.
9509.
MINIMUM
50.
10.
268J7.
1317.
4776.
ANNUAL COST OF WASTE
REPLACEMENT
2842230.
IBUTION OF OPERATION
MINIMUM
670264.
U40?8.
59515.
10094.
1317.
AVERAGE
469.
63fl.
334380.
48234.
90701.
TREATMENT
INTEREST
4377032.
AND MAINTENANCE COST
&VERAGE
670764.
21 1164.
77572.
22335.
563R.
TOTAL
79701.
108492.
56844608.
8199765.
15'»19H2.
TOTAL
15419027.
TOTAL
670264.
4856771.
698150.
L608148.
366474.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1 000000.
100000. TO 500000.
0. TO 100000.
PA XI MUM
0.
3812905.
92 0958 .
454966.
97927.
MINIMUM
0.
1066433.
516451 .
1T1564.
33546.
AVERAGE
3 .
1748292.
691402.
218290.
71705.
TOTAL
0.
38462432 .
8998223.
20737504.
2868188.
*l*
*2*
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TREATMENT ($ 1000)
*3*
*4*
*5*
*6*
*7*
*8*
»g*
*10*
MAX
MIN
TOT
SD
0.
0.
0.
0.
0.
0 .
p.
0.
0 .
0.
1763.
25.
243.
4134R.
298.
1287.
1.
SI.
15497.
188.
S.O.
864.
1295.
483135.
91263.
152081.
S.D.
0.
101333.
11987.
11112.
2300.
S.O.
0.
754754.
148324.
98293.
17688.
NUMBER
I.
23.
9.
72.
65.
NUMBER
0.
22.
13.
95.
40.
*ll*
*12*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
n*
*2*
*3*
DISTRIBUTION Of ANNUAL OSM TREATMENT COSTS (* 1000)
*4* * 5* * 6* * 7* * 8* * 9*
*10*
*H*
*12*
MAX
MIN
AVE
TOT
SD
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
539.
1 .
39.
6612.
73.
131.
0.
9.
1587.
18.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0. *
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE... 33
TOTAL NUMBER OF MANUFHCTURING PLANTS..,
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
196R FLOW CONDITIONS ( 1967 DOLLARS)
1137
MANUFACTURING EMPLOYMENT
FLOW 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO I0000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
4VF
TOT
SO
127753.
6.
2224.
762954.
10874.
*2*
2354,
I.
64.
70334.
188.
MX I MUM
6808742.
489468.
99775.
49531.
9996.
PAX IMUM
188174512.
4763163.
998590.
4925C5.
99679.
MINIMUM
504294.
100787.
50490.
10144.
776.
AVERAGE
1687607.
230822.
70707.
23233.
5127.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
M IN HUM
5044770.
1019747.
500588.
100430.
2 10 11.
AVERAGE
24139504.
2168022.
692608.
216890.
69132.
TOTAL
92818416.
38035648.
6010078.
7806180.
2543204.
TOTAL
1472509952.
333875456.
81035136.
121458656.
16937280.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT (* 1000»
S.D.
1427672.
102764.
13527.
10767.
2373.
S.D.
34355008.
955257.
137393.
100069.
19107.
8050.
14.
381.
348661.
756.
*4*
10028.
0.
165.
187774.
666.
*5*
0.
0.
0.
0.
0.
*6*
836.
0.
82.
59592.
86.
*7*
0.
0.
0.
0.
*8*
2354.
31.
326.
65915.
386.
*9*
0.
0.
0.
0.
0-
*10*
16948.
0.
5967.
125315.
4130.
NUMBER
55.
165.
85.
336.
496.
NUMBER
61.
154.
117.
560.
245.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*1*
1363.
0.
79.
26930.
171 .
*2*
50.
0 .
2.
2362.
5.
*3*
4390.
0.
too.
91706.
336.
DISTRIBUTION OF ANNUAL 0£M TREATMENT COSTS ($ 1000)
*<;* *6* *7# *8* *9*
813.
0.
16.
18465.
57.
0.
0.
0.
o.
0.
I 53.
0.
6.
4251 .
12.
0.
0.
0.
0.
0.
183.
1 .
17.
3339.
26.
0.
0.
0.
0.
0.
*10*
21.
0.
9.
197.
5.
*tl*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
OR S.O. REPRESENTS STANDARD DfcVIATION. THE DATA DI STRlBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOTM. NUMBER
331
OF MMWJF4CTUP ING
PLANTS...
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVhL
1968 FL3W CONDITIONS ( 1967 DOLLARS)
343
MANUFACTURING EMPLOYMENT
FtOW IMGY)
TQTM. CSPITU COST
TOTAL ANNUAL TGM COST
TOTAL ANNUAL COST
MAXIMUM
28000.
96435.
15P539616.
6808742.
259?7248.
MlNIMUM
75.
5.
2681 8.
1642.
5048.
iWER'yGF
1582.
4192.
3707271.
350125.
820911.
TOTAL
542753.
1437994.
1271594240.
120092816.
28157?608.
S.O.
329 I .
11 198.
13498694.
820206.
25C2507.
06M
ANNUAL COST OF WASTE TREATMENT
REPHCEMFNT INTEREST
120092816.
63579696.
97912704.
TOTAL
291585152.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CO
SD
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1 000000. TO
500000. TO
loonoo. TO
0. TO
*l*
iX 127753
N 6
'E 2224
IT 762954
i ICH74
500000.
1COOOO.
50000.
I 0000.
5000000.
1COOPOO.
500000.
100000.
*2*
?354.
1 .
158.
54313.
310,
M!\ XIMUM
6fi')874?.
439468.
9929}.
49093.
990«.
MXIMUM
I 88174512.
4477290.
978817.
48<;63fi.
T7327.
DISTRIBUTTI
#3* *4*
8050. 10028
19. 1
70?. 430
2408B6. 147521
112?. 1153
MINIMUM
504294.
102574.
50758,
10158.
1642.
HVER4GE
1741862 .
238721.
74666,
-•5997.
5061,
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5044770.
101 <5747.
501016.
101760-
3352?.
AVERAGE
27873888.
2167973.
721907,
253184,
70044.
TOTM. •
90576832.
24110816.
?837299.
2235757.
334025.
TOTAL
13100^3088.
218965280.
33207728.
23292896.
3992502.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT (* 10001
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
2354.
31 .
3?6.
65915.
386.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
1449583.
106916.
13346.
10994.
2128.
S.U.
38340320.
972681 .
141875.'
104572.
18537.
NUMBER
52.
101.
38.
86.
66.
NUMBER
47.
101.
46.
92..
57.
*n*
*12*
o.
0.
0.
0.
0.
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS ($ 1000)
*7*
MAX
MIN
AVF
TOT
so
1363.
0.
79.
26930.
171 .
59.
C .
5 .
1555.
R .
4391.
1 .
217 .
74390.
523.
813.
0.
40.
13877.
97.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0 .
0.
183 .
1 ,
17.
3339 .
0.
0 .
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.n. REPRESENTS STANDARD DEVIATION. THE OAT4 DISTRIBUTION USED IS HIGHLY SKEWED.
-------
sir. cone...
THT4L NUMBER
3312
OF M4NUFACTUR ING PLANTS...
* NAT IONAL TOTALS *
(•LOW AT OBSERVED 1968 LEVEL
1968 FL3W CONDITIONS ( 1967 DOLLARS)
20?
MAXIMUM
MANUFACTURING EMPLOYMENT 28000.
FLOW (MGY)
TOTM- C4PITHL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
COST RANGF
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TP 50000.
0. TO 1 0000.
96435.
150539616.
6HC8742.
25927248.
OEM
U 7266144.
DISTR
K&XIMUM
6808742.
489468.
9923.
/, qo<53.
0.
MINIMU"!
18C.
107.
1 93175.
20406.
44939.
ANSJUAI COST OF WASTE
REPLACEMENT
62462768.
*V ERAGE
2420.
7016.
6184434.
r>805?5.
1365952.
TR EATMENT
INTEREST
961Q264C.
TOTAL
488906.
1417262.
1249255680.
It 7266L44.
2759224J2.
TOT At
275921408
I6UTION OF OPERATION AND MAINTENANCE C.CST
MINIMUM
504294.
102574.
52006.
704C6.
0 .
4VtR4GF
1741862 .
23895R.
75700.
36298.
' 0.
TOTAL
90576832.
23656832.
2270995.
762262 .
0.
•— * DISTRIBUTION OF INVESTMENT REQUIREMENTS
09 COST RANGE
> 5000000.
1 000000. TO 5000000.
500000. TO 100000C.
100000. TO 500000.
0. TO 1 00000.
*l* *2*
MAX 127753. 2354.
MIN 19. 15.
!WF 3761. 261.
TOT 759710. 52712.
SD' 13980. 371.
M X 1 M!J M
203228384.
4P35471 .
097526.
48C382.
0.
DISTR I8UTION
*3* *4*
8O5C. 10028.
115. 13.
1117. 719.
225660. 145259.
1309. 1434.
MINIMUM
5448349.
1039591.
502253.
26C786.
i).
3F TOTAL CAPITAL CCST
*5* *6*
0. C.
n. o.
0. 0.
0. 0.
.1. 0 .
AVERAGE
30173776 .
2288434.
749101.
397491 .
0.
FCR TREATMENT ($ 1000
*/* *8*
?. 2354.
0. 31.
326.
0. 65915.
0 . 3 86 .
TOT4L
1414878208 .
238002416.
2«465824.
5167385.
0.
*9* *10*
0. 0.
0. 0.
0 . 0.
0. 0.
0. 0.
S.D.
4063.
13920.
17175872.
1007047.
3150751.
S.D.
1449583.
107014.
137Q5.
8176.
0.
S.D.
41407536.
1064263.
139029.
67357.
0.
NUMBER
52.
99.
30.
21.
0.
NUMBER
47.
104.
38.
13.
0.
*n*
o.
o.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (t 1'100)
*4* *5* * 6* *7* *8*
MAX
MIN
AVE
TOT
SD
1363.
5.
129.
26152.
208.
59.
1 .
7.
1445.
9 .
4390.
11 .
360.
72750.
644.
813.
2.
67.
I 3579.
120.
n.
o.
o.
o.
0.
U.
0.
0 .
0.
0.
0.
0.
0.
0.
103 .
1.
17.
3^9 .
26.
0.
0.
0.
0.
0.
*19*
0.
0.
0.
C.
0.
*tl*
0.
0 .
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANOARO OfcVlATION. THE DATA DISTRIBUTION USfcO IS HIGHLY SKEWED.
-------
SIC CODE... 332
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
HOW AT OBSERVED 1968 LEVEI
1968 FLOW CONDITIONS ( 1967 DOLLARS)
223
MANUFACTURING EMPIOYMFNT
FLOW IMGYI
TPTAL CMMTU COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAX! 1UM
4590.
1730.
697931.
90668.
179105.
MINIMUM
188.
3.
16809.
776.
291 1.
545.
l?5.
I 09707.
S 420.
22253.
TOTAL
121497.
27832.
24464640.
1855290.
4962381.
S.O.
622.
249.
103284.
12458.
254H7.
OEM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1855290.
1223231.
188377t.
TOTAL
4962297.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO I 000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SO
0.
0.
0.
o.
0.
*2*
86 .
t .
10.
2243 ,
13,
DISTRIBUTION OF 1PFRATION
MAXIMUM MINIMUM
0. 0.
0. 0.
90668. 58717.
48778. 10225.
9996. 776.
AND MAINTENANCE COST
0.
0.
73827 .
17519.
4604.
DISTRIBUTION OF INVESTMENT RL" QUI REMENTS
MAXIMUM MINIMUM AVERAGE
0. 0. 0.
0 . 0 . 0 .
872413. 618313. 7^1825.
398247. 100430. 166273.
79679. 210U. 67899.
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TREATMENT ($ 1000)
0.
0.
0.
0.
0.
*4*
127.
0.
9.
2044.
18.
*5*
O.
0.
0.
0.
0.
*6*
485.
16.
90.
20178.
73.
*7<-
0.
0.
0.
0.
0.
*8*
0.
0.
0.
0.
0.
TOTAL
o.
o.
442964.
560605.
851784.
TOTAL
0<
0.
5192773.
18123776.
7265176.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
S.D.
0.
0.
11364.
7564.
2363.
S.D.
0.
0.
92744.
64245.
18886.
NUMBER
0.
0.
6.
32.
185.
NUMBER
0.
0.
7.
109.
107.
*12*
0.
0.
0.
0.
0.
MAX
MIN
1VF
TOT
SO
*l*
0.
0.
0.
0.
o.
3.
0,
1 .
168.
0 ,
*3*
0.
n.
c.
o.
0.
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS ($ 1000J
*4* *5* * 6* *7* *8* *9*
17.
0.
L .
289.
2.
0.
0.
0.
0.
0.
70,
0.
6.
1398.
1C.
0.
0.
0.
0.
0.
0.
0 ,
0.
0.
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA OISTRIBUTICN USED IS HIGHLY SKEWED.
-------
sic CODE...
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVEl
1968 FLOW CONDITIONS ( 1967 DOLLARS)
117
MANUFACTURING EMPLOYMENT
FLOW (MGYJ
TOT 4L CUP IT HI COST
TOTAL ANNUAL CSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO ICOOOO.
I 0000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
WE
TOT
SO
*l*
0.
0.
0.
0.
0.
*2*
86 .
1 .
14.
1628.
16.
MAXIMUM
4590.
1730.
697S31.
90668.
179305.
OEM
1378110.
DISTR
¥ H XI MUM
0.
0.
90668.
48778.
9996.
MINIMUM
2QO.
14.
39347.
1980.
6984.
ANNUAL COST OF HASTE
REPLACEMENT
838628.
AVERAG^
583.
190.
143355.
11779.
29985.
TREATMENT
INTEREST
12
-------
SIC CODE... 3331
TOTM. NUMBER OF NUNUFACTUP INC PLANTS...
* NAT IONAL TOTALS *
FLOW AT OBSERVED 1968 LEVE1
ITftS FLOW CONDITIONS { 1967 OOLl ARSt
27
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTH. C4PIT&L COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAt COST
MAXIMUM
1870.
5659.
2140719.
3 705?4.
633603.
MI
1 C.
27.
56924.
4012.
11912.
AVERAGE
728.
1B08.
014289.
140347.
256462.
TOTAL
19654.
48812.
24685808.
3789375.
6924480.
S.D.
637.
1673.
687476.
U6842.
203279.
ANNUAL COST OF HASTE
PGM REPLACEMENT
3789375. 1734290.
TREATMFNT
INTEREST
TOTAL
6924471,
COST RANGE
> 500.000.
CO
^^
P""*
CO
100000.
50000.
10000.
0.
rr»CT D At
TO
TO
TO
Tn
tici c
5TOOOO.
100000.
50000.
1 0000.
> 5000000.
1000000. T(l 50COOOO.
500000. TO 1000000.
100000. TO 500000.
0. TO 100100.
0.
370524.
71257.
45150.
8367.
fAXIM'JM
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MINIMUM HVER\GE
0. 0.
102360. 221754.
71257. 71257.
17759. 28521.
4012. 549?.
OISTRIBUTI3N OF INMESTMfcNT REQUIREMENTS
IUM AVtRA.GE
0. 0.
13^6745. 1886146.
520611. 664264.
1300H1. " 292908.
74001. 85507.
0.
j "5 •
75544^.
99002.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT tt 1000)
*3* *4* *5* *6* *7* *8* * 9*
TOT&L
0.
3548057.
71257.
142603.
27461.
TOTftL
0.
282=1219? .
1992793.
1464538.
34202«.
TOT
so
0.
0.
0.
0.
r.
307 .
6.
130.
3513.
IOC.
1174.
46.
534.
1 4407 .
367.
685
4
251
6766-
224
0.
0.
n.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
3 .
0.
n .
0.
0.
0 .
0.
0.
*10*
o.
0.
0.
c.
0.
S.D.
0 .
77469.
0.
L2806.
1877.
S.O.
0.
512477.
125906.
118579.
10271.
NUMBER
0.
16.
1.
5.
5.
NUMBER
0.
15.
3.
5.
4.
*ll*
0 .
0.
0.
c.
0.
*12*
0.
C.
0.
0.
0.
"AX
1JIN
1VE
*3*
DISTRIBUTION Of- ANNUAL OSM TRFATMENT COSTS (* 1000)
*4* *5* *6* *7* *8* *9*
o.
0.
0.
0.
0.
p.
1 .
4.
106.
2 .
2<52.
3.
1 to.
2966.
9?.
71 .
1.
27.
717.
22.
0
0
^\
0
n
0.
0.
0.
c.
n.
o.
0.
0.
0.
0 .
0 .
0.
0 ,
0 .
0.
0 .
0.
0.
0.
*10*
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
*12*
0.
0.
. 0.
0.
0.
SO PR S.D. REPRESENTS STAMUARO DEVIATION. THfc DATA DI STPI 8!.'T ICN USED IS HIGHLY SKEWFil.
-------
SIC CODE... 3332
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
HOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
MANUFACTURING EMPLOYMrNT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL CEM COST
TOTAL ANNUAL COST
09
CO
O
COST RANGE
> 500000.
IOOOOO. Tfi
50000. TD
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
50000C.
100000.
50100.
I 0000.
5000000.
1000000.
500000.
IOODOO.
*2*
MAX
MIN
4V E
TOT
SO
MAXIMUM
520.
1317.
711915.
I 14209.
204623.
MI NIMUM
55.
83.
94683.
7022.
19047.
AVERAGE
267.
669.
396612.
57071.
107441.
ANNUAL COST OF WASTE TREATMENT
OEM
456569.
DISTR
fSXIMIJM
n.
t 14209.
J9775.
44700.
70?? .
VA X I «U M
0.
0.
925489.
448421 .
0.
DISTRIBUTION
REPLACEMENT
158645.
INTEREST
24431 ?.
IRUTIDN OF OPERATION AND MAINTENANCE CCST
MINIMUM
0.
102423.
58561 .
1 4644.
7022.
r> 1 STRI8UTION OF INVESTMENT
MINIMUM
0.
0.
536960.
12 3^88.
0.
OF TOTAL CAPITAL CCST FOR
AVFRiGE
P.
108316.
79168 .
2 48 59 .
70?-?.
REQUIREMENTS
AVF.RAGE
0 .
0.
795149.
236041 .
0.
TREATMENT ($ 1
TOTAL
2138.
5355.
3172892.
456569.
859526.
TOTAL
859526.
216633.
158336.
74578.
7022.
TOTAL
0.
0.
3180595.
0.
1000)
*3*
*5*
*6*
*7*
*8*
*9*
*10*
S.D.
164.
527.
256898.
43680.
76281.
S.D.
0.
8334.
29143.
17185.
0.
S.D.
0.
0.
175744.
144770.
0.
NUMBER
0.
2.
2.
3.
1.
NUMBER
o.
o.
4.
4.
0.
*11*
*12*
0.
0.
0.
0.
c.
0 .
0.
0.
0.
0.
518.
84.
301.
2400.
180.
193.
11.
S5.
764.
77.
0.
0.
C.
0.
0.
c.
0.
0.
0.
0.
1.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
"AX
AVE
TOT
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OCM TREATMENT COSTS (* 1-100)
*4* *5* *6* *7* *8*
0.
0.
0.
0.
0.
0.
n .
0.
•T.
0 .
*10*
*tl*
*12*
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
1.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
c.
n.
0.
0.
0.
0.
0.
0.
OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
sic cone... 3331
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
flow AT OBSERVED 1968 LEVFI
FL )W CINOITIUNS ( 1967
CO
MANUFACTURING EMPLOYPFNT
FLOW (NGY)
TOTM C4PIT&L COST
TOTAL ANMJAl 06M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
I 00000.
50300.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0." TO 100000.
M4XI MUM
2500.
3 755 .
15S7851.
289312.
492?39.
OEM
850878.
DISTR
MAXIMUM
0.
289312.
78064.
49049.
0.
MINIMUM
15 ).
124.
1 17743.
llfU5.
26769.
ANNUAL COST OF WAST
REPLACEMENT
286692.
inUTION OF ilPERATION
MINIMUM
0.
108883.
519M .
1 1815.
0.
AVERAGE
677.
683.
382256.
56725.
105272.
E TREATMENT
INTEREST
441505.
AND MAINTENANCE COST
4VER4GE
2 .
199097.
674?4.
25041.
0.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
CAXIMUM
0.
2C77?07.
845447.
476017.
0.
MINIMI!"
0 .
2077207.
542784.
153065.
0.
AVERSGt
0.
2077207.
661959.
272H94.
0.
TOT At
10150.
10240.
5733833.
850878.
Ib79074.
TOTAL
1579073.
TflTHL
0.
3981S4.
2.T2271.
250412.
0.
TOT1L
0.
2077207.
2647836.
2728939.
0.
DISTRIBUTION DF TOTAL CAPITAL CCST f Cfc TREATMENT ($ 1000)
*2*
MAX
WIN
&VE
TOT
SD
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
0.
1035.
102.
286.
4295.
234.
*4*
563.
16.
96.
1439.
138.
0.
0.
0.
0.
0.
*6*
0.
0 .
0.
0.
0.
*7*
0.
0.
0.
0.
0.
*8*
0.
0.
0 .
0.
0 .
0.
0.
0 .
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
683.
928.
370716.
70043.
117014.
S.D.
0.
127583.
13702.
t 1 1 00.
0.
S.D.
0.
0.
140091.
96938.
0.
NUHBE R
0.
2.
3.
10.
0.
NUMBER
0.
1.
4.
10.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MTN
-------
SIC CODE...
TOTSL NUMBER
3334
OF MANUFACTURING
PLANTS...
* NATIONAL TOTALS *
FLOW AT OBSERVED 196S LEVEl
1968 FL3W CONDITIONS ( 1967 DOLLARS)
21
MANUFACTURING EMPLOY
FLOW IMGY)
TOT4L CAPITAL COST
TOTAL ANMIAL OEM COST
TOTAL ANNUAl COST
MAXIMUM
3500.
11 000.
193C8032.
469437.
2921555.
MINIMUM
784.
915.
1866862.
59054.
296145.
AVERAGE
1598.
39bO.
6994469.
L9126U
1079557.
TOTAL
33558.
83586.
146883856.
4016477.
22670704.
S.O.
787.
2734.
4665315.
123130.
714705.
ANNUAl COST OF WASTE
H£M REPLACEMENT
4016477. 7344192.
TREATMENT
INTEREST
11310051.
TOTAL
22670720.
CO
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 500000P.
500000. TO 1000000.
100000. Tn 500000.
0. TO 100300.
MAX
MIN
HVE
TOT
sn
*l*
o.
0.
0.
0.
0.
*2*
0 .
0.
0.
k' »
0.
HA XI MUM
0.
469437.
8*839.
0.
n.
MX I MUM
25100416.
4625445.
0.
0.
0.
DISTRIBUTION OF TPEKATION AND MAINTENANCE COST
MINIMUM
0.
110787.
59054.
0.
0.
WFR4GE
0 .
251807.
70169.
0.
0.
DISTRIBUTION OF INVESTMENT REOUI Rlr MENTS
MINIMUM
6221202.
2426919.
0 .
O f
0.
AVERAGE
12504318.
3549098.
0 .
0 .
0.
TOTH
n.
3525295.
491184.
0.
0.
TOTAL
1625r.6144.
28392784.
0.
0.
0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
*5* *6* *7* *R* *9*
1419.
312.
692.
14531.
309.
941.
85.
335.
7038.
229.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
o.
0 .
0.
0.
S.O.
0.
106965.
9290.
0.
0.
S.D.
5281020.
739912.
0.
0.
0.
*10*
16948.
1470.
5967.
125315.
4130.
Ml*
0.
0.
0.
0.
0.
NUMBER
0.
14.
7.
0.
0.
NUMBER
13.
8.
0.
0.
0.
*12*
0.
0.
c.
c.
0.
MAX
MIN
AVF
TOT
SD
0.
0.
0.
o.
0.
0.
,<": .
0.
0.
0 .
*3*
361 .
45.
146.
3075.
95.
DISTRIBUTION OF ANN'JAL 06M TREATMENT COSTS (* 1000)
*5* * 6* *7* *8* *9*
88.
11.
35.
744.
23.
0.
0.
0,
0.
0.
0.
0.
0.
0.
c.
0.
"l.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
*10*
21.
4.
9.
197.
5.
*H*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTR1BUTICN USED IS HIGHLY SKEWED.
-------
sic CODE... 34
TOTU NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FLOW AT OBSERVFO 1968 LF.VF.L
1968 FLOW CONDITIONS < 1967 DOLLARS)
1037
MANUFACTURING EMPLOYMENT
FLOW IMGY)
TOT&L CVIT4L COST
TOTAL ANKUAl OEM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TP
0. TO
OJ
CO
60 COST RANGE
> •5000000.
1000000. TO
500000. TO
100000. TO
0. TO
*l*
MAX n
MIN 0
M/F P
TOT 0
SD 0
500000.
100000.
50000.
I 0000.
•5000000.
1000000.
500000.
1 000 00.
*2*
10?
\
1C
10590
10
M4XI MUM
14000.
1935.
1053750.
186429.
320256.
OEM
12575899.
OISTR
MS XI P'JM
0.
IU6429.
9S522.
49789.
9992.
MINIMUM
54.
2.
1141 7.
650.
2154.
ANNUAL COST OF WASTE TR
REPLACEMENT
6207171.
IBUT ION OF OPERATION AND
MINIMUM
0.
1061 63.
51735.
10013.
650 .
JVERAGt
565.
106.
119714.
12127.
27129.
EATMENT
INTEREST
955904C.
MAINTENANCE COST
WtRUGE
0.
136663.
68984.
17202.
5425.
"DISTRIBUTION OF INVESTMENT REQUIREMENTS
PAX I MUM
0.
Ul 7187.
B80682.
480?C8.
99947.
WIN I»UM
0.
1079237.
501505.
100083.
14272.
AVERAGE
•• .
U67406.
638542.
174941 .
64078.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
626.
03*34 .
65.
308.
0.
17.
1770t.
26.
o.
o.
n.
o.
*6*
0.
0.
0.
0.
0 .
*7*
0.
0.
0.
0.
*8*
TOTAI
586016.
110071.
124143440.
12575899.
28339776.
TOTAL
28342096.
TOT4L
0.
956638.
1241718.
7138814.
3238817.
TOTftL
0 .
5837030.
12770840.
113186816.
233*8432.
0.
0.
0 .
0.
0.
18.
0.
2 .
2317.
2.
0.
0.
0.
0.
0.
S.U.
875.
165.
102174.
15342.
28216.
S.D.
0.
28348.
15596.
8010.
2617.
S.D.
0.
113578.
127298.
71247.
24439.
NUMBER
0.
7.
18.
415.
597.
NUMBER
0.
5.
20.
647.
365.
* 11*
0 .
i).
0.
0 .
0.
*12*
0.
0.
0.
0.
0.
MAX
M(N
AVE
TOT
SO
*1
*
C.
0.
0.
0.
0.
*2*
4.
V ' m
1 .
795.
C .
*3*
1 36.
0.
9 .
8R34.
11 .
*4*
3S.
0.
2.
2385.
3.
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (t 1000)
*5* *6* *7* *8*
0.
n .
o.
C.
0.
0.
0.
n.
a.
o.
0 .
0 .
0.
0.
0.
0 .
9.
0.
1.
561 .
I .
*10*
0.
0.
0.
0.
0.
*lt *
o.
0.
0.
0.
0 .
*12*
0.
0.
0.
0.
0.
SO OR S.O. RfPRESENTS STANDARD DEVIATION. THF DATA DISTRIBUTICN USED IS HIGHLY SKErfEO.
-------
sic cone... 35
TOTM. NUMBER OF MtNUFACTUP ING PLANTS...
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS f 1967 DOLLARS)
790
MANUFACTURING EMPLOYMENT
FlOW (MGY>
TDT4L CAPITAL COST
TOTAL ANNUAl CEM COST
TOTAL ANNUAl COST
COST RANGE
> 500000.
LOOOOO. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
** COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*l*
*2*
MAX
WIN
HVE
TOT
SO
M\XI MUM
36000.
4290.
1876150.
334738.
573009.
OEM
10662950.
OISTR
PI XI MUM
0.
334738.
99560.
49573.
9988.
MINIMI)''
9.
0.
1 7? 1 .
20.
238.
ANNUAL COST OF WASTE
REPLACEMENT
5003180.
IRIJTIQN OF 1PFRATION
MINIMUM
0.
102463.
50568.
10004.
20 .
WERAGE
1260.
126.
126663.
13497.
29582.
TREATMENT
INTEREST
7704894.
AND MAINTENANCE CCST
IWER4GE
D.
177506.
70901 .
20623.
4987.
- DISTRIBUTION OF INVESTMENT REQUIREMENTS
PAX I HIM
0.
2345187.
988624.
493675.
99465.
MINIMUM
0.
1083486.
524762.
100118.
2152.
AVERAGE
?.
1617760.
719462.
199275.
63780.
TOTAL
995341.
99226.
100063616.
10662950.
23369968.
TOTAL
23371024.
TOTH
0.
1242542.
1559830.
5362020.
2498663.
TOT4L
0.
8088801.
13669769.
80108448.
23215936.
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TREATMENT ($ 1000)
*4* *5* *6* *7* *8*
0.
0.
0.
0.
0.
180 .
0.
11.
865?.
14.
1008.
2.
<33.
73724.
89.
660.
0.
20.
15837.
43.
0.
0.
0.
0.
:>.
0.
0.
0.
0.
0.
0.
• ' *
0.
0.
0.
0.
0 .
0.
0 .
29.
0.
2.
1849.
3.
*10*
0.
0.
0.
0.
0.
S.D.
2275.
269.
146762.
22174.
40698.
S.D.
0.
85071 .
14396.
10187.
2469.
S.D.
0.
638285.
128678.
98156.
23920.
NUMBE R
0.
7.
22.
260.
Ml.
NUMBER
0.
r
,• *
19.
402.
364.
*11*
0.
• 0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*I*
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (t 1000)
*4# *5* *6* *7* *8*
0.
0.
0.
0.
0.
5.
0.
I .
614.
0 .
244.
0.
10.
7524.
16.
69.
0.
3.
2044.
5.
D.
0.
0.
0.
0.
0.
Of.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
0.
16.
0.
I.
481.
1 .
*to*
0.
0.
0.
0.
0.
0.
c.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. PFPRESENTS STANOARO DEVIATION. THE DATA DI STRf 8UTICN USED IS HIGHLY SKEWED.
-------
SIC. CODE...
TOT*L NUMBEP
36
OF M&NUFACTUF INC PtANTS...
* NATIONAL TOTALS *
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS < 1567 DOLLARS)
MANUFACTURING EMPLOY NFNT
FLOW (MGY)
TOTM. C\PITU COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TC 100000.
10000. TO 50DOC.
0. TO 1 0000.
CO
ts?
W COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100OOO. TO 500000.
0. TO 100000.
*1* *2*
MAX 0. 286.
MIN 0. 2.
4VE 0. 14.
TOT P. 11355.
SO 0. 18.
MAXIMUM
22800.
8289.
30508CI.
626570.
1014022.
OGM
141 U244.
DISTR
MXTMUM
676570.
235226.
\ B57P?.
49243.
9877.
MINIMU1'.
60.
8.
2646 }.
1555.
5054.
ANNUAL COST OF WASTE
REPLACEMENT
6473185.
WERAGe
1535.
171.
1 58462.
17272.
37394.
TREATMENT
INTEREST
996870C.
[BUT ION OF OPERATION AND MAINTENANCE CCST
MINIMUM
513217.
100996.
50? 87.
I 0001 .
1555.
iWERAGE
569893 .
155633.
63532 .
19424.
6205.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
3PL3501.
^30594.
497958.
99972.
DISTRIBUTION
*3* *4*
14<)0. 1230.
23. I.
115. 27.
93626. 22102.
106. 67.
MINIMUM
0.
1040946.
502061.
100345.
33078.
OF TOTAL CAPITAL CCST
*5* *6*
0. 0.
0. 0 .
0. 0.
0. 0.
0 . 0 .
AVERAGE
0.
1781643.
648057.
194124.
76207.
FOR TREATMENT It 1000)
*7* *8*
1. 0.
0. 0.
0 . 0 .
o. n. 2
0. 0 .
TOTAL
1254103.
139439.
129463712.
141 U244.
30550960.
TOTAL
30553104.
1139786.
1867598.
1524778.
6973126.
2606037.
TOTAL
0.
17816432.
18145600.
109485840.
16384579.
44.
0.
3.
2379.
3.
*10*
0.
0.
0.
0.
0.
s.o.
2272.
443.
191583.
35248.
59332.
S.D.
80160.
50089.
11586.
9166.
2040.
S.D.
0.
944149.
127731.
87773.
15857.
NUMBER
2.
12.
24.
359.
420.
NUMBER
0.
10.
28.
564.
215.
*ll*
0.
0.
0.
0.
0.
*12*
'0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SO
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS <$ 10001
*4* *">* *6* *7* *9* *9*
0.
n.
0.
0.
0.
8.
0 .
I .
709.
1 .
458.
1 .
12.
10022.
26.
129.
0.
3.
2736.
7.
0.
0.
n.
o.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
30.
1.
644.
2.
*10*
0.
0.
0.
o.
0.
0.
0 .
0.
0.
0 .
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS ^TAt^DARO DEVIATION. THE DAI A DISTRIBUTION USED IS HIGHLY SKEHEO.
-------
sic CODE... 37
TOTAL NUMBER OF MANUFACTURING PLANTS..
* NATIONAL TOTM.S *
FLOW AT OBSERVED 1968 LEVEL
1968 FL3W CONDITIONS ( 1967 DOLLARS)
MANUFACTURING EMPLOYMENT
F10W 500000.
100000. TO 50000C.
50000. TO 100000.
10000. Tn 50000.
0. TO 10000.
COST RANGE
> 5000000.
I 000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTP.fBUTION OF OPERATION AND MAINTENANCE COST
MXIfMJM
505230.
362315.
948CI.
49535.
9959.
fAXIKLIM
0.
3087420.
984276.
494549.
99510.
MINIMUM
505230.
103105.
51571.
10035.
897 .
AVERUGE
505230.
189259.
70409.
21887.
5400.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMA
0.
1077363.
516459.
100153.
20246.
AVERAGE
171104L.
685938.
213169.
61851.
MAX
MtN
4V £
TOT
SO
*l*
0.
0.
0.
0.
0.
DISTRIBUTION DF TOTAL CAPITAL CCST FCR TREATMENT {$ 10001
TOTHL
505230.
5677772.
3097985.
5296564.
1323120.
TOTHL
0.
37642912.
34296880.
72051024.
9401313.
*2*
235,
20.
11124.
28.
*3*
1267.
14.
149.
83800.
162.
*4*
931.
1.
46.
25585.
96.
*5*
0.
0.
0.
0.
*6*
0.
0.
0.
0.
0.
*7*
0.
0.
*
0.
0.
*8*
0.
0.
0 .
0.
0.
*9*
37.
0.
4.
2201 .
5.
*10*
0.
0.
0.
0.
0.
S.D.
0.
76626.
12798.
10778.
2634.
S.D.
0.
562685.
124418.
101547.
21714.
*11*
0 .
0.
0.
0.
0.
NUMBER
1.
30.
44.
242.
245.
NUMBER
0.
22.
50.
338.
152.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
0.
0.
0.
0.
0 .
*2*
7.
f .
I .
615.
1 .
*3*
369.
0.
20 .
11400.
37.
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (* 10001
*4* *5* *6* *7* *8* *9*
104.
0.
6.
3146.
10.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
r.
0 .
0.
0.
0 .
0.
25.
0.
I.
740.
*10*
0.
' 0.
0.
0.
0.
0.
0.
0.
0.
0 .
*12*
0.
0.
0.
0.
0.
SO PR S.D. REPRESENTS STAf.DARO DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW OF LEAST EFFICIENT ThO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FIOI-1 CONDITIONS I 1967 DOLL4RS)
SIC CODE... 20
TOTAL NUMBER OF MANUFACTURING PLANTS... 4494
MANUFACTURING EMPLOYMENT
FL OH ( MGY )
TOTAL CAPITAL COST
TflHL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
5500.
65893.
33487040.
?6C4477.
6P5733C.
MINIMUM
3.
1.
16860.
669.
287*.
AVERAGE
206.
133.
177026.
9685.
32172.
TOTAL
924045.
598750.
795553024.
43524176.
144581632.
S.O.
325.
1085.
635527.
47295.
127795.
ANNUAL COST OF WASTE
OEM REP1 ACEMENT
43574176. 3S777648.
TREATMENT
INTEREST
61257552.
TOTAL
144559376.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CO
COST RANGE
> 500000.
100000. TO
^0000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
IOOOCO. TO 500000.
0. TO 100000.
PAX IMUM
2604477.
477S63.
99285.
49605.
9997.
MAXIMUM
41858800.
4775635.
999554.
497771.
-)996S.
I M
506196 .
10480fl.
50685.
1 0042 .
669.
AVERAGE
1014164.
190795.
69055.
18978.
388R .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
515C2U .
1001477.
50C238.
100058.
?1075.
AVFRAGE
11674731.
1809345.
693267.
207386.
62811 .
TOTAL
5914658.
4695709.
13569323.
14287711 .
TOTAL
116747312.
184553248.
131027520.
428873472.
133472464.
S.O.
894707.
95287.
13944.
8943.
2290.
S.D.
10934836.
833606.
145L15.
97242.
20846.
NUMBER
5.
31.
68.
715.
3675.
NUMBER
10.
102.
189.
2068.
2125.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
1TN
we
TOT
so
*
0.
0.
0.
0.
0.
*2*
3469.
p .
19.
49378.
88 .
*3*
237.
0.
2".
34851.
19.
*4*
17450.
0.
92.
66999..
707.
*5*
65.
8.
16.
11789.
8.
*6*
7299
0
L28
330800
?41
*7*
0.
0.
0.
0.
0.
5269.
5.
67.
298940 .
127.
28.
] .
4.
2837.
3.
*10*
0.
0.
0.
0.
0.
*ll*
0.
(.'.
0.
0.
0 .
*12*
0.
0.
0.
0.
0.
MAX
M1N
AVF
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL 0£M TREATMENT CCSTS It 10001
*4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
42 .
n.
i .
1912.
1 .
24.
0.
2.
1672.
2.
574.
0.
5.
3434.
2't.
49.
1.
4.
3169.
5.
1717
0
9
22874
4->
0.
0 .
0.
0.
271.
0 .
2.
9738.
5.
10.
0.
I.
52s?.
1 .
*10*
C.
0.
0.
0.
0.
Ml*
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
SO HR S.O. REPRESENTS STANDARD DCVIATION. THE OAT! DISTRIBUTION USEC IS HIGHLY SKFWED.
-------
SI C CODE...
TdTAL NUMBER
22
* NATIONAL TOTALS *
PLOW OF LEAST EFFICIENT TWO-THIRCS OF WATER
1968 FLOW CONDITIONS I 1967 OOLLARSI
USF. REGIONS MODIFIED
HF MANUFACTURING PLANTS... 1021
MANUFACTURING EMPLOYMENT
Fl OW (MGV)
riTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNLIAl COST
MAXIMUM
9000.
242? .
1307597.
79356.
'38569.
U6M
M tNIMUM
15.
10.
41569.
1493.
699R.
ANNUAL COST OF WASTE
REPLACEMENT
AVERAGE
537.
161.
208169.
891 6.
35349.
TREATMENT
INTEREST
TOTAL
548467.
163932.
212540064.
9103227.
36091776.
TOTAL
S.O.
602.
197.
143954.
7420.
25330.
9103227.
IC627C02.
16365576.
36095792.
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
CO
CO
CO
COST RANGE
> 500000.
100000. TO
•50000. TO
10000. TO
0. TO
COST RANGE
> 500000C.
1000000. TO
500000. TO
100000. TO
0. TO
500000.
100000.
50000.
10000 .
roooooo.
1000000.
500000.
100000.
KAX IMOM
0.
0.
79356.
49752.
99<36.
PAXIWJM
0.
1634463.
960954.
497712.
19842.
M IH IMIIM
0.
0.
51924 .
10076.
1493.
DISTRIBUTION OF
MINIMUM
0 .
1007220.
502827.
100258.
51962.
AVERAGE
0 .
0.
65334.
16693.
5625.
INVESTMENT REQUIREMENTS
AVERAGE
0.
1223106.
654544.
237089.
82004.
TOTAL
0.
0.
261336.
4707309.
4134649.
TOTAL
0.
12231065.
43199936.
202948176.
7298334.
MAX
MIN
*VE
TOT
SO
DISTRIBUTION OF TOTAL CiPtTIL CCST FOR TREATMENT <* 10001
S.D.
0.
0.
13384.
7213.
2110.
S .0.
0.
225188.
125129.
101009.
13075.
NUMBER
0.
0.
4.
282.
735.
NUMBER
0.
10,
66.
856.
89.
*
0.
0.
0.
0.
C.
*2*
41 .
0.
5.
2862 .
5.
*3*
I "56.
n.
34.
19110.
27.
*4*
165.
0.
8.
7038.
13.
*5*
0.
0.
0.
0.
0.
*6*
656.
t-i •
119.
lOBSTO.
82.
*7*
0.
0.
0.
0.
0.
*8*
501.
12.
73 .
745*3.
56.
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*il*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OGM TREATMENT COSTS {* 1000)
*5* *6* *7* *8* *9*
*10*
*11*
*12*
MAX
M IN
AVF
TOT
SO
0.
0.
0.
0.
0.
1.
0.
"; m
241.
0 .
12.
C.
? .
843.
?.
7.
0.
1.
593.
1.
3.
0.
0.
0.
0.
59.
I.
6.
5339.
6.
0.
0.
0.
J .
0.
14.
1 .
2.
2087 .
1 .
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
flR
S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE... 24
TT1TSL NUMBEB OF M4NUFACTUP ING PUNTS...
* NATIONAL TOTALS *
FLOW (IF LEAST EFFICIENT TWO-THIRCS C1F W4TER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
405
MANUFACTURING EMPLOYMENT
FlOW (MGYI
TOTAL CAPITAL COST
TOTAL ANNUAL CSM COST
TOTAL ANNUAL COST
CO
Cs?
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TC
0. TO
500000.
100000.
50000.
10000.
50COOOO.
1000000.
500000.
100000.
MAX
MIN
AVE
TOT
SD
0.
0.
0.
0.
0.
*2*
0.
0.
0,
0.
0,
MAXI MUM
14500.
7138.
2908433.
235?49.
S04620.
06M
5312013.
OISTR
MAXIMUM
0.
235249.
82770.
48079.
9970.
M[ NIMUM
75.
2R.
80532.
2150.
12530.
ANNUAL COST OF WASTE TP
REPLACEMENT
5788568.
IBUTION OF OPERATION AND
MINIMUM
0.
235249.
50092.
10020.
2150.
HVER4GE
369.
221.
285855.
1311 6.
49419.
EATMENT
INTEREST
8914391.
MAINTENANCE CCST
AVERikGE
0 .
235249.
61082 .
17091 .
6661.
TOT4L
149384.
89627.
115771376.
5312013.
20014656.
TOTAL
20014960
TOTAL
0.
235249.
488658.
3195966.
1392194.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
3635541 .
9B3634.
496428.
->.
DISTRIBUTION
*3* *4*
0. 752.
. 0. 3.
0. 26.
0. 10476.
n. 45.
MINIMUM
0.
1039375.
50C791.
100665.
0.
AVERAGE
0.
1478944.
673431 .
282397.
0 .
TOTAL
0.
14789440.
31651248.
98274160.
0.
OF TOTAL CAPITAL COST FOR TREATMENT <$ 1000)
*5* *6*
0. 1084.
0. 48.
0. 150.
0. 60853.
0. 89.
*7* *8*
0. 1073.
0. 29.
0. 110.
0. 44441.
0. 81 .
*9* *lo*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
s.o.
7/4.
409.
212153.
15214.
41995.
s.o.
0.
0.
11675.
807^.
2201.
S.O.
0.
787362.
130145.
90217.
0.
NUMBER
0.
1.
8.
187.
209.
NUMBER
0.
10.
47.
348.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*l*
0.
0.
0.
0.
0.
*2*
0.
0.
0.
0.
0.
*3*
0.
0.
Q .
0.
0.
DISTRIBUTION OF ANNUAL CCM TREATMENT COSTS ($ 1000>
*7* *8* *9*
49.
0.
2.
858.
3.
D.
n
- •' *
o.
o.
0.
145.
1.
8.
3197.
9.
0.
0.
0.
0.
0.
41,
1 ,
3.
1257,
3,
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS ST4MDARO DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NAT IONAL TOTAl S *
FLOW OF LE4ST EFFICIENT TViO-THIRCS OF WATER USE RfcGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
SIC CODE... 26
TOTU. NUMBFR OF fUNUFUCTUR ING PLANTS... 862
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL C6M COST
TOTAL ANNUAL COST
4000.
42476.
236812S6.
1668232.
4513334.
MINIMUM
12.
8.
25804.
898.
4190.
4VER1GE
4'. 7.
2018.
1264778.
88171.
248813.
TOTAL
38551 I.
1739092.
1090238720.
76003344.
214477232.
S.O.
540.
4397.
2549735.
179163.
500326.
OEM
ANNUAL COST OF HASTE TREATMENT
REPL4CEMENT INTEREST
76003344.
545US20.
83948336.
TOTAL
214463600.
CO
u?
o
COST RANGE
> 500000.
100000. TO
50000. Tn
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
5000CO. TO
100000. TO
0. TO
500000
100000
50000
I 00 00
5000000
i 000000,
500000
100000
DISTRIBUTION OF OPERATION
PAXIMUM MINIMUM
1^68232. 503414.
468983. 100503.
59802. 5005?.
49615. 10092.
9989. 808.
AND MAINTENANCE CCST
4VER4GE
875968.
207847.
71042.
26R81 .
5007.
DISTRIBUTION OF INVESTMENT RETIREMENTS
PAX mi M
29601616.
4676807.
993066.
495417.
<19799.
MINIMUM
50?7460.
1008279.
507297.
100205.
32254.
AVERAGE
11773966.
2026616.
757838.
219937,
77796.
MAX
WIN
4V E
TOT
SO
*l*
0.
0.
0.
0.
0.
DISTRIBUTION OF TOTHL C1PITU CCST f-OR TREATMENT (t 10001
TOTAL
25403072.
3221 6304.
9448607.
7634172.
1306928.
TOTAL
612246272.
555292928.
129590352.
57843376.
7935221.
*2*
0.
0.
0.
0 .
0.
*3*
0.
0.
0.
0.
0.
7536.
I.
316.
211362.
830.
*5*
0.
0.
0.
0.
0.
*6*
3256.
25.
460.
39633?.
485.
*7*
0.
0.
0.
0.
0.
*8*
4557.
12.
464 .
326324.
600.
*g*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
s.o.
327868.
96611 .
13927.
I 1919.
2352.
S.D.
6622633.
886911.
138180.
106482.
16501.
NUMBER
29.
155.
133.
284.
261.
NUMBER
52.
274.
171.
263.
10?.
*11*
8508.
2110.
4222.
L56217.
1831.
*12*
0.
0.
0.
0.
0.
MAX
MIN'
AVF
TOT
SO
0.
0.
0.
0.
0.
*2*
n.
o.
>.' •
o.
p.
0.
0.
0.
0.
DISTRIBUTION OF ANNUAL 0£W TREATMENT COSTS (t 1000)
*4* *5* *6* *7* *8* *9*
248.
0.
16.
10432.
28.
0.
0.
0.
0.
0.
740.
1.
47.
40257.
68.
0.
0.
0.
0.
185.
1 .
15.
104U.
22 .
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
851.
189.
403.
149C4.
178.
*12*
0.
0.
0.
0.
0.
SO OR S.O. RFPRESENTS ST»NDM»D DEVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
StC CODE...
TOT»t NUMBER
28
OF M4NUFACTUR ING
* NATIONAL TOTALS *
FLOW OF LE»ST EFFICIENT TfcC-THlRCS OF W4TER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
PUNTS... 1421
MAXIMUM
MANUFACTURING EMPLOYMENT 28600.
FlOW (MGY)
TOT&L C4PITHL COST
TOTAL ANNUAL 0£* COST
TPTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. Til ICOOOO.
10000. TO 60000.
0. TO 10000.
04
OJ
•"* COST RANGE
> 5000000.
1000000. TO 5 000000.
500000. TO 1 000000.
100000. TP 500000.
0. TO 1 00000.
*l* *2*
MAX 7172. 861 .
MI N 0, ? .
WE 91. 28.
TOT 35309. 33433.
SO 532. 59.
33247.
17935904.
1607101.
3884960.
Q6M
45690176.
D1STR
PAXlfUM
1607101.
437354.
99175.
4S969.
9991.
MINIMUM
25.
5.
8881.
814.
1947.
ANNUAL COST OF WASTE
REPL&CEMENT
29719264.
»VER4Cf
550.
501.
418287.
32154.
85286.
TREATMENT
INTEREST
45767646.
[RUT ION OF OPERATION AKO MAINTENANCE CCST
MINIMUM
55 5945 .
100740.
50005.
1C021 .
814.
4VER4GE
951666.
177063.
69870.
22435.
5744.
DISTRIBUTION OF INVESTMENT REQU IREMENTS
MAX IMUM
22415872.
4ROS508.
976905.
49S571.
996S3.
DISTRIBUTION
*3* *4*
2374. 3400.
2L . 0.
!57. 52.
191322. 73295i
180. 175.
MINIMUM
5167943.
1004459.
500719.
100410.
I 1101.
OF TOT&L C»PIT4L CCST
*5* *6*
276. 2755.
0 . 0.
27. 284.
16483. 86564.
26. 271.
AVERAGE
11409926.
1923063.
684558.
234137.
59092.
FCR TREATMENT it 1000)
*7* *8*
73. 3870.
0. 0.
34. 188.
361?. 153800.
7. 297.
TOT*L
781889.
712005.
594385408.
45690176.
121191344.
TOTAL
121177088.
TOTAL
5709993.
13102692.
7825483.
16130419.
2929415.
TOTAL
91279408.
2*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS 1$ 1000)
*4* «5* *fc* *7* *8* *9*
MAX
MIN
AVF
TOT
SD
213.
0.
7.
2564.
17.
14.
0.
L .
1106.
\ .
67?.
0.
16.
19083.
36.
166.
0.
4.
4981.
9.
577.
0.
15.
9093.
38.
288.
0.
15.
4523.
23.
11.
0.
2.
193.
I .
202.
0.
5.
4015 .
11 .
10.
0 .
I .
137.
?.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STiNDARO DfVIATlON. THE DATA OISTR1BUT1CN USED IS HIGHLY SKEWER.
-------
SIC CODE... 29
TOTAL NUMBER OF MANUFACTURING PL&NTS...
* NATIONAL TOTALS *
FLOW OF LEAST EFFICIENT Tk»C-THlRCS OF WATER USE REGIONS MODIFIED
1968 FLHW CONDITIONS ( 1967 DOLLARS)
334
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAt OEM COST
TOTAL ANNUAt COST
MAXIMUM
10000.
23582.
64726384.
1870653.
10090902.
MI NIMIIM
27.
4.
26943.
1645.
5067.
AVERAGE
381.
727.
1937008.
93975.
339986.
TOT^L
127318.
242940.
646960896.
"51387696.
113555408.
S.D.
876.
2045.
5081015.
184368.
825144.
ANNUAL COST OF HASTE
OEM REPLACEMENT
31387696. 32348032.
TREATMENT
INTEREST
49815952.
TOTAL
113551680.
CO
COST RANGF
> 500000.
100000. TO
50000. TO
10000. TO
0. TC
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
5000 CO. TO t000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF flPERATION
PAXIPUM MINIMUM
1870653. 538860.
466652. 101192.
99001. 51997.
49009. 10208.
9751. 1645.
AND MAINTENANCE CCST
AVFR4GE
882280.
188046.
70923.
27786.
5038.
PAX I MUM
80C07968.
4895670.
991593.
493878.
96949.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5063841.
1013414.
503399.
101174.
33679.
AVERAGE
15325547.
221 4318.
725825.
?27?]5.
68310.
*2*
DISTRIBUTION OF TtmL CAPITAL CCST FOR TREATMENT ($ 1000
> *4* *s* *6* *7* *8*
MAX
WIN
4V F
TOT
SO
35206.
5.
420.
140413.
2334.
412 .
0.
23.
7724.
4? .
2288 .
10.
183.
60973.
254.
1021.
0.
32.
10673.
88.
31.
0.
<-•• .
878.
4.
0.
0.
0.
0.
o.
0.
0.
0.
".'.
o.
186.
0.
31 ,
3198.
24.
TOTAL
10587359.
13163185.
4113560.
31120 62 .
413118.
TOTAL
475091968.
272361216.
43549488.
13638898.
4098600.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
367879.
89851.
14261.
I 1526.
2120.
S.O.
15646569.
10 16324.
144238.
125141.
17132.
0.
0.
0.
0.
0.
NUMBER
12.
70.
58.
U2.
82.
NUMBER
31.
123.
60.
60.
60.
*12*
25800.
150.
1832.
423120.
2914.
*2*
*3*
DISTRIBUTION OF ANNUAL CUM TREATMENT COSTS <* 10001
*4* *5* *£* *7* *8* *9*
MAX
MIN
AVF
TOT
SD
472.
0.
23.
7584.
46.
7.
0.
I .
305.
1 .
467.
C.
10.
6460.
43.
61.
0.
2.
824.
6.
17
:0
?
202
2
0.
0.
0.
0.
C.
0.
0.
0.
0.
0.
7.
0.
I.
140.
I .
0.
o:
o.
o.
o.
*io*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
864.
6.
69.
15873.
100.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 30
TOT*!. NUMBER OF M4NUFJCTUR ING
* NATIONAL TOTALS *
FLOW OF LEAST EFFICIENT TWC-THIROS OF WATER USE REGIONS MIDIFIfcO
1968 F13W CONDITIONS ( 1967 DOLLARS)
PLANTS. .,
459
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOT»t CAPITAL COST
TOTAL ANNUAL DCM COST
TOTAL ANNUAL COST
MAXIMUM
20000.
?465.
155U30.
1 62 19* .
359250.
MINIMUM
45.
3,
21613.
3660.
4VER4GE
663.
71.
I'i2938.
8102.
262S6.
TOTAL
30*302.
32*59.
65608752.
3718853.
12051546.
S.O.
1295.
155.
120868.
11085.
26299.
ANNUAL COST OF WASTE
OEM REPLACEMENT
3718853. 3280437.
TREATMENT
INTEREST
5051871.
TOTAL
12051161.
CO
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
I 0000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TP 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION
MAXIMUM MINIMUM
0. 0.
162194. 162194.
87643. 50261.
4C745. 1CC75.
9975. 915.
AND MAINTENANCE CCST
WER4GE
0.
162194.
69478.
16627.
5252.
fAXIPUM
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1939537.
791624.
492736.
99306.
0
51 1826.
1 0 02 1 8 .
27016.
AVERAGE
0.
1334245.
628217.
178964.
80760.
MAX
MIN
WE
TOT
SO
*l*
DISTRIBUTION DF TOTAL CAPITA! CCST FCR TREATMENT 1$ 1000)
TOT4L
0.
162194.
347391.
1213798.
1995583.
TOTAL
0.
5336981.
5025734.
64785008.
6864558.
*2*
*4*
0.
0.
0.
0.
0.
112.
I .
7.
3141 .
fl.
235.
4.
24.
10823.
19.
180
0
5
2429
11
*5*
0.
0 .
0.
0.
0.
5<»C.
12.
70.
31968.
49.
*7*
0.
0.
0.
0.
0.
*8*
435.
5.
38.
I 7248.
34.
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
0.
0.
16985.
6304.
1854,
S.O.
0.
410141.
103392.
75988.
14366.
NUMBER
0.
1.
^.
73.
380.
NUMBER
0.
4.
8.
367.
85.
*11*
0.
0.
0.
o.
o.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*1*
*2*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (S 1000)
*5* *<5* *7* *8* *9*
0.
0.
0.
0.
0.
4.
0.
I .
285.
0 .
31.
0.
t .
545.
2.
21.
0.
1 .
353.
1.
0.
0.
0.
0.
0.
87.
0.
4.
1796.
6.
0.
0.
0.
0.
0.
20.
0.
2,
740 .
1.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
I'll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRI8UTICN USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW OF LEAST EFFICIENT ThO-THIRDS OF WATtR USE REGIONS MODIFIED
1968 FLOW CONDITIONS { 1967 DOLLARS)
SIC CODE... 31
TOT4L NUMBER OF M4NUF4CTURING PLANTS... 215
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL ^PITHL COST
TOTAL ANNUAL C£M COST
TOTAL ANNUAL COST
M4XIMUM
3700.
6349.
2553192.
214222.
456758.
MINIMUM
60.
6.
12165.
1061.
2606.
WER4GC
476.
237.
402392.
19960.
71065.
TOTAL
102307.
51027.
86514336.
4291402.
15278901.
S.D.
504.
505.
465301.
26325.
82444.
OtM
4291402.
j
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
4325716.
6661600.
TOTAL
15278718.
CO
CO
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
o. Tn ioooo.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 50000O.
0. TC 100000.
MAX
MTN
&ve
TOT
so
*1*
*2*
PHXIMUM
0.
214222.
94026.
46835.
9739.
MAXIMUM
0.
3191490.
9650C7.
494153.
61739.
MINIMUM
0.
I 14131.
5 0403.
10076.
1061.
4VEIUGE
0.
150792.
67584 .
226-5?.
2617.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1012275.
517147.
109181.
15206.
AVCR4GE
0.
1525676.
613436.
314806 .
29569.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT (* 1000
*3*
*4*
*5*
0.
0.
0.
0.
0.
279.
2?.
74.
8192 .
50.
1057.
127.
344.
37789.
185.
609.
21.
114.
12576.
108.
99.
0.
14.
1433.
14.
*6*
0.
0.
0.
0.
0.
*7*
0.
0.
0.
0.
0.
*8*
720.
8.
123.
26524.
121.
TOTAL
0.
603166.
1013757.
2444260.
230268.
TOT4L
0.
54924336.
36058672.
14795888.
2365488.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
S.D.
0.
43870.
12944.
9693.
2152.
S.D.
0.
580238.
126243.
119670.
9246.
NUMBER
0.
4.
15.
108.
88.
NUMBER
0.
36.
52.
47.
80.
*12*
0.
0.
0.
0.
0.
MAX
MtN
TOT
SO
*l*
*3*
DISTRIBUTION OF ANNJAL 0£M TREATMENT COSTS (* 1000»
*^* *5* *6* *7*
0.
0.
0.
0.
0.
4
1
I
160
1
101 .
5.
21 .
2259.
IS.
24.
I.
5.
534.
4.
175.
0.
7.
721.
19.
0.
0.
0.
0.
0.
0.
0.
0.
0.
39.
1 .
3.
618.
3.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
Ml*
0.
c.
0.
0.
0 .
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARC DEVIATION. IHF DATA DI STRI BUTICN_USEO IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
SIC CODE... 32
TOTAL NUMBER OF MANUFACTURING PLANTS... <345
MANUFACTURING EMPLOYMENT
Ft OW (MGY)
TOT4L CAPITAL COST
TOTAL ANNUAL C6M COST
TOTAL ANNUAL COST
MHXIMUM
8000.
4834.
1857306.
407209.
643C87.
MINIMUM
5C.
5.
17466.
606.
2834.
AVERAGE
345.
159.
141170.
14866.
32793.
TOTAL
125708.
150009.
133405840.
14047921.
30988944.
S.D.
586.
377.
172122.
28397.
49988.
ANNUAL COST OF HASTE
O&M REPLACEMENT
14047921. 6670291.
TREATMENT
INTEREST
10272244.
TOTAL
30990448.
CO
VI
COST R4NGE
> «iOOOOO.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
0.
A07209.
99137.
49265.
9975.
MAXIMUM
0.
2321632.
975724.
407533.
99243.
MINIMUM
0.
135230.
50370.
t 00 12 .
606 .
4VERIVGE
0.
178239.
74524.
18010.
48<)0.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
•").
1004449.
505899.
100019.
21833.
&VER4GE
0 .
1388263.
707045,
181092,
62627.
TOTAL
0.
3208293.
1863094.
6267449.
2709197.
TOTM.
0 .
23600480.
19090224.
103403600.
20666768.
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TREATMENT ($ 1000 I
*
-------
SIC CODE... 33
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIOtUL TOT4LS *
FLOW OF LEAST EFFICIENT TVC-THIRDS OF WATER USE REGIONS MflOIFIED
1968 FLOW CONDITIONS ( 1967 DOU.ARSI
I 137
M&XIMUM
MANUFACTURING EMPLOY PFNT 28000.
FLOW 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 1 0000.
CO
OS
°* COST RANGE
> 5000000.
1000000. TO * 000000.
500000. TO 1000000.
190000. TO 500000.
0. TC 1 00000.
*l* *2*
MAX 27284. 1209.
MIN 6. 1.
»VE 708. 43.
TOT 242996. 46503.
SO 2604. 115.
44500.
38'i36C<56.
3101819.
7995902.
OEM
88903088.
OISTR
PAXI^UM
3101819.
491766.
98859.
49565.
9971 .
MINIMUM
1C.
3.
16805.
776.
291 I.
ANNUAL COST OF WASTE
REPLACEMENT
40230992.
AVERAGE
902.
893.
707669.
7819 !.
168080.
TREATMENT
INTEREST
61955712.
TOTAL
1025720.
1015870.
804620032.
88903088.
191107072.
TOTAL
191089792
IBUTION OF OPERATION AND MAINTENANCE CCST
MINIMUM
51 1689.
100659.
50490.
1 0046.
776.
AVERHGt
1172829.
200652.
73864 .
21950.
• 4625.
TOT 4L
49258848.
24680240.
6278418.
5816627.
?876732.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
48170112.
4777005.
987378.
498154.
99606.
DISTRIBUTION
*3* *4*
4450. 4282.
14. 0.
272. 93.
248272. 105672.
498. 333.
MINIMUM
50261 06.
1002785.
533251 .
100240.
2 10 11.
OF TOTAL CAPITAL CCST
*5* *6*
0. 741.
0. 0.
0. 59.
0. 42372.
0. 57.
AVERAGE
1?5*>4?88 .
20771873.
714272.
200701 .
68605.
FOR TREATMENT ( t 1000 )
*7* *8* *
0. 1310.
0. 31.
0 . 232.
0. 46947.
0 . 2 44 .
TOTAL
552828672 .
255578416.
72855744.
98945376.
25727040.
9* *10*
0. 8653.
0. 0.
0. 3427.
0. 71963.
0. 2023.
S.D.
2033.
3258.
2475715.
259339.
567618.
S.C.
680124.
91280.
14421.
1 1000 .
2262.
S.D.
9755290.
100 1454.
153819.
97900.
18784.
NUMBER
42.
123.
85.
265.
622.
NUMBER
44.
123.
102.
493.
375.
*11*
0 .
0.
0.
c.
0.
*12*
0.
0.
0.
0.
0.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (* 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SO
654.
0.
49.
16905.
96.
30.
0.
2 .
1728.
3 .
1970.
0.
60.
54613.
179.
367.
0.
10.
IC962.
31.
0.
0.
0.
0.
127.
0.
3.
2439.
7.
0 .
0.
o.
0.
0.
81 ,
1 .
11.
21 25,
14.
0.
0.
0.
0.
0.
*10*
12.
0.
6.
130.
3.
0.
C.
0.
c.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA OISTRIBUTICN USED IS HIGHLV SKEWED.
-------
src CODE...
TOTHL NUMBER
* NATIONAL TOTALS * „,..-„
FlOW OF LEAST EFFICIENT TUO-THIROS OF HATER USE- REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
DF MANUFACTURING PLANTS...
1037
MANUFACTURING EMPLOYMENT
FLOW 500000.
100000. TO
50000. TO
loooo. Tn
0. TO
500000.
100000.
50000.
IOOOC.
COST RANGE
> 5000000.
1000000. TO 500000C.
5000 CO. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION
MAXIMUM MINIMUM
0. 0.
133095. 138795.
979*0. 54336.
48629. ICC27.
9993. 616.
ft NO MAINTENANCF. COST
0 .
160945.
75590.
16809.
4960.
hAXIMUM
C.
1297405.
878323.
45321ft.
99939.
DISTRlBUTtON OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1036676.
51 1R15.
100077.
14272.
AVERAGE
0.
I 167040.
666825.
153282.
63753.
TOTAL
0.
321890.
907079.
3227352.
4121588.
TOTAL
0.
2334081.
B001903.
66524512.
37550272.
MAX
AVF.
TOT
SO
*2*
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT (* 10001
*3* *4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
100.
1.
7 .
7527.
P.
618.
10.
6P.
70897.
52.
302
0
11
I 1392
19
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
18.
0.
2.
1709.
1 .
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
o.
o.
0.
s.o.
0.
31325.
15322.
8334.
2439.
S.D.
0.
184363.
116073.
65657.
24320.
NUMBER
0.
2.
12.
192.
831.
NUMBER
0.
2.
12.
434.
589.
*12*
0.
0.
0.
0.
0.
M4X
MIN
AVE
TOT
SO
*2*
*3*
DISTRIBUTION OF &NNUAL OEM TRE«TMENT COSTS <$ 10001
*7* *8* *9*
0.
0.
0.
0.
0.
4.
n .
i .
671 .
n.
133.
0.
6.
5943.
9 .
37.
0.
2.
1590.
2.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
9.
0.
0.
374.
1.
*io*
0.
0.
0.
0.
0.
*H*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW OF LEAST FI-FICIENT ThC-THIRDS OF HATER USE REGICNS MODIFIED
196<5 FLOW CONDITIONS ( J967 DOLLARS)
SIC CODE... 35
TOTAL NUMBER OF MANUFACTURING PLANTS... 790
MANUFACTURING EMPLOYMFNT
FLOW (MGYI
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
36000.
2199.
1287222.
169721.
3331<38.
MINIMUM
9.
0.
1721.
20.
238.
AVERAGE
1260.
66.
83794.
7887.
18530.
TOTAL
995341.
52449.
66197040.
6230688.
14638389.
S.O.
2275.
139.
90670.
12274.
23727.
OEM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
6230688^
3309851.
509716S.
TOTAL
14637708.
O9
SM
CO
COST RANGE
> -500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1 000000, TO
500000. TO
100000. TC
0. TO
500000.
100000.
50000.
10000.
5000000.
1000000.
500000.
I 00000.
MAX
MIN
AVE
TOT
SO
*1*
M4XI MUM
DISTRIBUTION Of OPERATION AND MAINTENANCE COST
MINIMUM AVERAGE
0
97C56.
48824
9877.
0.
109781 .
53834.
10039.
20.
0.
127769.
65938.
18354.
4104.
MAXIMUM
1609027
«24356.
478690.
99B35.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
1042495. 1325760.
511536. 662953.
100066. 177545.
2152. 57813.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT {$ 10001
TOTAL
0.
511074.
395625.
27347U.
2589368.
TOTAL
0.
2651521.
5966580.
43143552.
30987920.
0.
0.
0.
0.
0.
124.
0.
7 .
5451 .
9.
753.
?.
65.
51331 .
59.
389
0
11
8484
23
0.
0.
0.
0.
0.
*6*
0.
0.
c.
c.
0.
*7*
0.
0.
0.
0.
0.
*8*
0.
0.
0.
0.
0.
*9*
21.
0.
2.
1231.
*10*
0.
0.
o.
0.
0.
S.D.
0.
28377.
15722.
7793.
2245.
S.D.
0.
400601 .
175871.
71146.
21499.
NUMBER
0.
4.
6.
149.
631 .
NUMBER
0.
2.
9.
243.
536.
*11*
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (* 1000)
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
3.
0 .
1 .
491 .
0 .
123.
0.
5.
43 13.
9.
35.
0.
1 .
1155.
2.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
8.
0.
0.
272.
I .
*10*
0.
0.
0.
0.
0.
*u*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW OF LEAST EFFICIENT TWO-THIRDS CF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
SIC CODE... 36
TOTAL NUMBER OF MANUFACTURING PLANTS... 817
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TflTiL 4NNU4L COST
MAXIMUM
22800.
1544784.
285926.
482114.
MINIMUM
60.
8.
23968.
1464.
4508.
AVERAGE
1535.
11 1.
123441.
12221.
27897.
TOTAL
1254L03.
90909.
100851296.
9984454.
2279155?.
S.D.
2272.
208.
115857.
18308.
32850.
OEM
9984454.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
5042564.
7765545.
TOTAL
22792560.
CO
CO
CO
COST RVJGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TC
500000,
100000
*0000
10000.
5000000
1COOOOO
500000
i ooooo
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
P4XICUM
0.
285926.
99984.
49924.
9964.
MAXIMUM
0.
1930980.
"27197.
MINIMUM
0.
100382.
54078.
10103.
1464.
4VERHGE
0.
160223.
73381.
18218.
5851.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
99937.
MINIMUM
0.
1630806.
533424.
100122.
2 99 60 .
HVER&GE
0.
1780893.
706750.
174719.
74189.
MAX
MIN
M/F
TOT
SO
*1*
0.
0.
0.
0.
0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT (» 100C)
TOTAL
0.
9M336.
1100718.
4809531.
T112939.
TOTAL
0,
3561786.
14841743.
84738720.
22924528.
*2*
149,
2.
11 ,
8617,
11,
*3*
854.
21 .
S3.
75670.
72.
*4*
517.
1.
18.
14686.
32.
*5*
0.
0.
0.
0.
0.
*6*
0.
0.
'••.
0.
0.
*7*
0.
0.
0.
0.
o.
*8*
0.
0.
0 .
0.
0 .
*g*
25.
0.
2,
1878.
2.
*10*
0.
J.
0.
0.
0.
S.D.
0.
79353.
14505.
8322.
2059.
S.D.
0.
212252.
133203.
75417.
15856.
NUMBER
0.
t.
15.
*U*
0 .
0.
0.
0 .
0.
532.
NUMBER
0.
2.
21.
485.
309.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SO
0.
0.
0.
0.
0.
5.
0 .
L .
618.
0 .
*3*
2C8.
1.
9.
7021.
13.
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS I* 1000)
*4* *5* *6* *7* *8* *9*
59.
0.
?.
1898.
4.
•1.
0.
0 .
0.
•1.
0.
c.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
o. •
0.
0.
0.
14.
n.
1.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
<;n t?R S.D. RFPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION UStO IS HIGHLY SKEWED.
-------
* N^IGNAL TOT4LS *
FLOW OF LEAST EFFICIENT TfcC-'HIRCS OF WATER USE fUGInNS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
SIC CODE... 37
TOTAL NUMBER OF MANUFACTURING PLANTS... 562
MANUFACTURING EMPLOYMENT
FLOW 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1 000000. TO
500000. Tn
loonon. TO
0. TO
500000
loooor
50000
10000.
5000000,
I 000000,
500000
100000,
f A XI MUM
0.
I 10910.
77642.
49539.
9689.
MAXIMUM
0.
0.
855457.
482489.
99403.
MINIMUM
0.
110910 .
50084.
10117.
660 .
4VERAGE
0.
110910.
63698.
20938.
4044 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
0.
524759.
100145.
I 3699.
WER4GE
0.
0.
648319.
194547.
57010.
TOTAL
0.
110910.
636978.
2219415.
!799562.
TOTAL
0.
0.
5834875.
33072992.
21838096.
S.D.
0.
0.
8405.
9716.
2197.
S.D.
0.
0.
102208.
92909.
2 1490 .
NUM6E R
0.
1.
10.
106.
445.
NUMBER
0.
0.
9.
170.
383.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
*2*
MAX
MIN
SVE
TOT
SO
0.
0.
0.
0.
0.
66 .
1 .
7.
4024.
8.
434.
10.
t6.
37357.
58.
173
0
11
6309
19
*5*
0.
0.
.">.
0.
*6*
0.
0.
0.
0.
0.
*7*
0.
0.
0.
0.
0.
*8*
0.
0.
0 .
0.
0.
*9*
12.
0.
2.
905.
2.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*i*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS (* 1000)
*4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
3.
0 .
I .
365.
0.
flO.
0.
6.
3306.
9.
22.
0.
2.
887.
?.
0.
0.
o.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
5.
0.
0.
209.
t.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
STC CODE...
TOTAL NUMBER
?0
* NATIONAL TOTALS •>
FLOW LESS THIkN OR EQU4L TO MEDUN OF W »T ER USE PFGIONS
1968 FLOW CONDITIONS ( 1967 DCLI ARS I
OF M&NUF^TUR ING P14NTS... 4494
M4NUPICTURING EMPlOYMFNT
FLOW (MGYI
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
5500.
81468.
39821440.
3125120.
8182441.
MIN
3.
1.
16860.
669.
2874.
206.
166.
203229.
11469.
37284.
TOTHL
924045.
743829.
913309952.
51541728.
167556176.
S.D.
325.
1340.
750811.
56757.
151889.
06 M
ANNUAL COST OF WASTE TREATMENT
REPHCEMENT INTEREST
•51541728.
45665488.
70324816.
TOTAL
167532032.
W
COST RANGE
> 500000.
100000. Tfl 500000.
50000. TO 100000.
10000. TO 50000.
0, TO 10000.
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MIN
AVF
TOT
SO
PAX I MUM
312512C.
4'59345.
98652.
49440.
9997.
MAXIMUM
49776800.
4843651.
992309.
499856.
99979.
MINIMUM
560409.
102^96.
50250.
10009.
669.
AVERAGE
1094480.
185552.
68725.
18938.
4065.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5109412.
1005192.
500594.
100093.
21075.
AVERAGE
11319332.
1798032.
679788.
239840,
64120.
DISTRIBUTION OF TOT&L C4PIT4L CCST FOR TREATMENT {$ 100C1
*
0.
0.
0.
0.
0.
*2*
4064.
-/ •
23.
58783.
103 .
*3*
237.
0.
32.
37640.
21 .
*4*
21509.
0.
116.
84014.
871.
*5*
76.
8.
18.
13167.
9.
*6*
820".
0.
1 44.
372826.
273.
*7*
0.
0.
0.
0.
6039 ,
5.
76.
343454.
147.
TOTAL
6566880.
K535399.
5566758.
16760052.
14128406.
TOTAL
158470656.
230148208.
160429872.
473608448.
L 19199648.
*9*
35 .
I .
5.
3349.
4.
*10*
0.
0.
0.
0.
0.
S.D.
1004518.
92614.
13625.
9044.
2306.
S.O.
11504767.
769383.
147840.
99400.
2U51 .
0.
0.
0.
0.
0.
NUMBER
6.
46.
81.
885.
3476.
NUMBER
14.
128.
236.
2257.
1859.
*12*
0.
0.
0.
0.
0.
MIN
AVF
TOT
SO
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS ($ 1000)
*5* *6* #7* *8* *9*
0.
0.
0.
0.
0.
50.
0.
1 .
2103.
1.
29.
0.
2.
2107.
2.
695.
0.
6.
4223.
30.
64.
1 .
5.
3899.
7.
2045
0
It
27451
50
0.
0.
0.
0.
0.
335.
0.
2.
11099.
6.
13.
0.
I.
663.
1 .
*10*
0.
0.
0.
0.
0.
*u*
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE OUT* DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* N4TIONU TOT4LS *
FLOW LESS THAN OR F1UAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
SIC CODE... ?0l
TOTAL NUMBER OF MANUFACTURING PtANTS... 729
MANUFACTURING
FLOW (MGY)
TOTAL CAPITAL COST
T3TAL ANNUAL 0£M COST
TOTHL MANUAL COST
MAXIMUM
4000.
2306.
105867.
23037S.
MI NIM UM
50.
18.
45186.
2321.
8214.
AVERAGF
278.
139.
1 40 1 3 6.
9906.
27/02.
TOTAL
20251 7.
101321.
102158960.
7221226.
20195008.
S.D.
427.
230.
t 11708.
11017.
25112.
06M
7221226.
4NNUU COST OF W*ST£ TREATMENT
REPLACEMENT INTEREST
5107947.
7866236.
TOT AL
20195408.
CO
to
COST RANGE
> 500000.
100000. TO
50000
10000
DISTRIBUTION HF OPERATION »NO MAINTENANCE COST
TO
TO
TO
500000.
100000.
50000.
10000.
COST RSNGF
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAXIMUM
0.
105867.
89676.
49121 .
•5883.
MAXIMUM
0.
1275519.
93C490.
496868.
99979.
MINIMUM
0 .
102930.
5C727.
10014,
2321 .
AVERAGE
0.
It
70215,
17R98.
5886 ,
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MI N1 M UM
0.
1033825 ,
506590.
100230.
56483.
WtRIGE
1119719.
659687 .
I /9440.
6534H,
TOTAL
o.
208797.
702153.
3114215.
3196120.
TOTAL
o.
5598595.
12534048.
94206032.
S.D.
0.
2076.
14105.
795H.
1666.
S.D.
(j.
88S39.
144701.
80377.
1C425.
NUMBER
0.
2.
10.
174.
543.
NUMBER
0.
u
19.
525.
DISTRIBUTION OF T1TAL CAPITAL CCST FOR TREATMENT (t tOOfi)
MAX
MIN
AVE
TOT
SO
0.
0.
0.
0.
0.
108,
:•».
11
8382 .
12 ,
*3*
0 .
'" .
0.
o.
0.
*4*
0.
0.
0.
0.
0.
76.
8.
13167.
9.
*6*
0.
0.
c.
0 .
0.
,0.
0 .
0.
0 .
0 .
762.
33 .
106.
77260.
D7 .
35.
1 .
5.
3349.
4 .
*10*
C.
0.
0.
0.
p.
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
01STRIBUTICN OF
MIN
•we
TOT
so
0 .
0.
0.
0.
0.
*2*
3 .
D ,
1.
46fl
0 ,
*3*
0.
0 .
a.
o.
0 .
0.
0.
0.
0.
0 .
64.
t .
5.
3899.
&L UCM TRESTMENI COSTS (J 1000)
*6* *7* * 3* *9*
0.
0.
0 .
0.
0 .
26 .
1 .
3 .
2191 .
J.
13.
0.
1 .
663 .
1.
*10*
0.
0.
0.
0.
0.
0.
(.'.
0.
0 .
0.
*12*
0.
0.
0.
•-' •
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DA! ,\ DISTRIBUTION UStD IS HIGHLY SKEWED.
-------
* NATIOML TOTUS *
FLOW LESS THAN OP. EQUAL TO MEDIAN OF WA1ER USE REGIONS
1960 FLOU CONUIT IOMS ( 1967 DOLLARS)
SIC CODE... 202
TOTAL NUMBER OF MANUFACTURING PLANTS... 1182
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TDT4L ^NNU^L COST
MAXIMUM
2100.
658.
437771.
36264.
89832.
MINIMUM
Id.
4.
16860.
679.
2874.
AVERAGE
10/.
34.
55886.
2899.
9997.
TOTAL
126823.
40695.
66056688.
3426690.
11816675.
S.O.
15b.
49.
38925.
2723.
7630.
!\NNU4L COST OF U*(S1t TREATMENT
REPLACEMENT INTEREST
3426690.
3302834.
5086362.
TOTAL
11815886.
tfS
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST
> 50000CO.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000,
0. TO li'OOOO.
DISTRIBUTION OF HPEHATICK
MAXIMUM MINIMUM
0. <;.
0. 0.
0. ').
36264. 10018.
9403. 679.
AND MUNTENlVNCt COST
AVERAGE
0.
0 .
0.
16650.
2626.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM
0. 0.
0. 0 .
547213. 527251.
472044. 100393.
99968. 21075.
0 .
0.
537232,
146033.
54110,
TOTAL
0.
0.
0.
332959.
3043756.
TOTAL
0.
0.
1074464.
2«038352.
5'^ 46 1008.
S.O.
0.
0.
0.
7680.
1617.
S.D.
0.
0.
14117.
56981 .
1 9608.
NUMBER
0.
0.
0.
23.
1150.
NUMBER
0.
0.
2.
L9i.
988.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 10001
*1*
*3*
*/,*
*6*
*7*
*8*
*9*
*10*
MAX
MIN
AVE
TOT
SD
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0 .
237.
10.
32 .
3764D.
21 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
'). 201.
0 . 7 .
('.. 24.
0. 28414.
0. 18 .
0.
0 .
0.
0.
0.
0.
0.
0.
c.
o .
0.
').
0 .
0.
0.
0.
0.
0.
0.
0.
M HX
MIN
AVE
TOT
SO
0.
0.
0.
0.
n.
*2*
0.
0 .
f;.
0 .
0.
29.
0 .
2.
2K7.
DISTRIBUTION OF ^NNI»L OEM TREATMENT COSTS (J 10001
*/f* *5* *6* *7" *3~ *9*
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
u.
0 .
0.
1 .
B .
0.
1 .
1320 .
1.
0
0
0
0
0
*10*
0.
0.
0.
0.
0.
*u*
0.
c.
0.
0 .
0.
*12*
0.
0 .
0.
0.
0.
SO DR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* N&TIUN4L TDTUS *
FLOW LOSS THAN 3P. EQUAL TO MEDIAN OF WATtK USfc REGIONS
1968 FLOW CflNDIT IUMS ( 1967 OOLIARS)
SIC CODE... 203
TOTAL NUMBER OF MANUFACTURTNG PLANTS... 691
MANUFACTURING EMPLOYMENT
FLOW (MGV)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
10T4L ANNUAL COST
MAXIMUM
1360.
3174.
2144887.
130828.
403228.
MI N I M UM
28.
16.
73836.
2144.
1203').
AVERAGE
213.
H2.
305726.
13463.
52287.
TOTAL
147275.
13237*.
21 1256496.
9302654.
36130480.
S.D.
261.
268.
2166J3.
1276*>.
40173.
HNNU4L COST OF V^STE
0£M REPLACEMENT
9302654. 10562824.
TREATMENT
INTEREST
16266742.
TOTAL
J6132208.
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION UF OPERATION
500000.
100000.
•50000.
toooo.
COST R1NGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAXIMUM
0.
130828.
93117.
48203.
9997.
MAXIMUM
0.
2681108.
9923C9.
497849.
97389.
MINIMUM
0.
130828.
50250.
10)74.
2144.
M»INTENM\iCfc COST
AVERAGE
0.
130828.
65843.
18099.
6372 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMU"
0.
1013014.
500594.
102165.
92358 .
1412710.
678245.
277810.
94942.
MAX
M IN
AVE
TOT
SO
*1*
0.
0.
0.
0.
0.
*2*
213.
4.
21 .
14560.
20.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT <$ 10001
*3* *4# *5* *6* *7* *8*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
978.
44.
161 .
111402.
102.
0.
0.
0.
0.
0.
954.
27 .
123.
85290.
95.
TOTAL
0.
130828.
1119335 .
5809681.
2242877.
TOTAL
0.
31079632.
81389344.
151128608.
4/4711.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
S.O.
0.
0.
13731.
8477.
2017.
S.O.
0.
375142.
141468.
96351.
1790.
NUMBER
0.
I.
17.
321.
352.
NUMBER
0.
22.
120.
544.
5.
*11*
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*t*
0.
0.
0.
0.
0.
*2*
4.
0 .
1.
633.
0.
•*3*
0.
0 .
0.
0.
0 .
DISTRIBUTION OF \NNU M. OCM TREATMENT COSTS (i 1000)
*5* *6* *7* * 3*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
9t>.
I.
9 ,
6222.
10,
0.
0.
'.>.
0.
0.
29.
1 .
4 .
2447 .
3.
0.
0.
0.
0.
0.
0.
0.
0.
u.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED !S HIUHLY SKEWED.
-------
SIC CODE...
TOTAL NUMBER
2041
OF MANUFACTURING PL&NTS.
* NATIONAL TOTALS *
FLCW LESS THAN OR FtJUAL TO CEO UN OF W »r ER USE KEGUJNS
1968 FLOW CONDIrIONS ( 1967 OCLLARS)
45
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANMAL COST
MAX I MUM
1600.
390.
337C45.
226T3.
65408.
MINIMUM
125.
2C.
57104.
2562.
9814.
AVFRAGt
309.
70.
1 112PO.
5715.
19847.
TOTAL
13889.
3136.
5007584.
257166.
893130.
S.D.
284.
68.
56653.
3871.
11052.
ANNUAL COST OF hASTE
OS" REPHCEMENT
257166. 25T379.
TREATMENT
INTEREST
385584.
TOTAL
893129,
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
CO
*N
cn
COST RANGE
> 500000.
100000. TP
50000. TO
10000. TO
0. TO
•s ooooo.
I 00000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO *000000.
500000. TO 1000000.
100000. TO 500000.
n. in 100000.
M4X
TOT
SO
*1*
0.
0.
0.
0.
c.
*2*
0.
0 .
0.
iMUM
o.
0.
0.
2?6C3.
85 15.
MINIMUM
0 ,
.0.
0 .
10141.
2562.
AVERAGE
0 .
0.
0.
13957.
4447.
MAX IMUM
0.
0.
404454.
99756.
DISTRIBUTION Of- INVESTMENT REQUIREMENTS
AVERAGE
0 . 0.
0. 0 .
0 . 0.
I'il593. 162266.
68525. 86215.
TOTAL
0.
0.
0.
83742.
173424.
TOTAL
0.
0.
0.
4543454.
1465654.
DISTRIBUTION OF TOT \L CAPIT-AL CCST FOR TREATMENT (t 1000)
*3* *4* *5* *6* *7* * 8* *9*
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
2C7.
39.
72.
3255.
34.
^
^' •
0.
0.
0.
0.
130
18
39
1752
22
*io*
Ml*
S.D.
0.
0.
0.
4656.
1458.
S.O.
0.
0.
0.
72199.
9456.
NUMBER
0.
0.
0.
6.
39.
NUMBER
0.
0.
0.
28.
17.
*12*
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*2*
*}*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS ($ 10001
*4*
*5*
0.
0.
0.
0.
0.
0.
0.
0 .
0.
n.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
18.
182.
*7*
*8*
*10*
*11*
0.
0.
0.
0.
r>.
5.
1 .
2.
76.
I .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THF 0&T4 DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE... 2042
TOTAL NUMBER HF MANUFACTUR ING PL&NTS...
* NATIONAL TOTALS *
FLOW LESS TH»N OR EQIHL TO MEDIAN UP WATER USE "EGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OCM COST
TOTAL ANNUAL COST
MAXIMUM
1000.
366.
324799.
20711.
61960.
MINIMUM
115.
2 1.
60056.
2368.
9995.
4VERAGE
261.
85.
127721.
6457.
22677.
TOTAL
15126.
491 8.
7407820.
374484.
1315273.
s.o.
194.
67.
5575C.
3546.
10582.
ANNUAL COST OF WASTE
06M REPLACEMENT
374484. 370391.
TREATMENT
INTEREST
570402.
TOTAL
1315277.
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
CO
COST RANGE
> 500000.
100000. TP
50000. TO
10000. TO
0. TO
500000 .
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
50000". TO icroooo.
100000. TO 500000.
0. TO 100000.
TOT
so
#1*
*2*
MAXIMUM
0.
0.
0.
20711.
9709.
MAXIMUM
0.
c.
0.
339758.
97314.
MINIMUM
0.
0.
0 ,
10387.
2368.
AVERAGE
o.
0.
0.
13537.
5324.
DISTRIBUTION OF INVESTMENT RECUIREMENTS
MINIMUM
0.
0.
0.
100247.
72068.
AVFR.\GE
0.
0.
0.
165542.
TOTAL
0.
0.
0.
108299.
266185.
TOTAL
0.
0.
0.
8111553.
777837.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TRE4TMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
0 .
•).
0.
0 .
0.
0.
r .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
200.
41.
83.
4788.
34.
i* *
0.
0.
0.
0.
124
20
45
2620
22
*10*
*ll*
S.O.
0.
0.
0.
3732.
1773.
S.D.
0.
0.
0.
65636.
9490.
NUMBER
0.
0.
0.
8.
50.
NUMBER
0.
0.
0.
49.
9.
*12*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SO
*1*
0.
0.
0.
0.
0.
*2*
0.
0.
0 .
c.
0.
DISTRIBUTION Of ANNUAL 0£M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
0.
0.
0.
0.
n.
0.
0.
0.
r>
*
0.
0.
0.
0.
0.
0.
16
I
5
268
3
*10*
*11*
*12*
0.
0.
0.
0.
0.
5.
1 .
2.
106.
1.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
SO PR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USEC IS HIGHLY SKEWED.
-------
si c cnof...
Tf'TAt NUMPFP
* NATIONAL TOTALS *
FLCW LESS THAN OR FOIHL TO MEDIAN OF W ST ER USE REGIONS
1968 FlOW CONOITICNS ( 1967 DCLIARS)
2043
OF MANUFiVCTliR ING
PUNTS.. .
in
ii"G EMPLOYMFNT
FlOW (MGY)
T-ITAI CAPITAL COST
THTAL ANNUAL OEM COST
T^TAL ANM'At CPST
MAXIMUM
4200.
349.
326C17.
24231.
65635.
M1NIMU1'
430.
27.
68982.
3240.
12000.
AVER4GF
976.
87.
128911.
7100.
23471.
TOTAL
9760.
871.
1289112.
70996.
234713.
S.D.
1164.
97.
75874.
6375.
15992.
OEM
ANNUAL COST OF ViASTE TREATMENT
REPLACEMENT INTEREST
70996.
64456.
99262.
TOTAL
234713.
CO
CnST RANGE
> 500000.
100000. TO
51000. TO
1000". T(l
0. TO
DISTRIBUTION OF 1PERATION AND MAINTENANCE CCST
500000.
t^OOOO.
10900 .
COST RANCF
> 5POOOPO.
1000000. TP 5000000.
500000. TO 1000000.
Tf ">COOOO.
0. TO 1^0000.
PAX I MUM
0.
0.
0.
24231.
552«.
fAX[MUM
0.
0.
3-J1220.
MINIMUM
0 .
0.
0 .
10796.
3240.
AVERAGE
0 .
0.
0.
17513.
4496.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0 .
0.
0.
105721.
82779.
AVERAGE
0.
0 .
0.
162684.
82779.
TOTAL
0.
0.
•0.
35027.
35969.
TOTAL
0.
0.
0.
1464155.
«2779.
S.D.
0.
0.
0.
9500.
796.
S.D.
0.
0.
0.
92779.
0.
NUMBER
0.
0.
0.
2.
B.
NUMBER
0.
0.
0.
9.
I.
DISTRIBUTION OF TOT41. CAPITHL CCST FOR TRS-STMENT (t 1000)
M&X
MTN
A VF
ri)T
SI)
0.
0 .
r>.
0.
p.
0.
0 .
P.
0 .
*3*
0.
0.
0.
0.
0 .
*4*
0.
0.
0.
*5*
0.
0.
0.
0.
*6*
201 .
46.
•132.
46.
*7*
0.
0.
0.
0.
0.
* 8*
1 25.
23.
46.
'»57.
30.
*9*
*10*
*U*
*12*
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
"'AX
TOT
sn
*l*
*?*
DISTRIBUTION OF AWJAL OEM TREATMENT CCSTS (t 1000)
*4* *5* *6* *7* *8* *9*
r.
0.
0.
0.
0.
0 .
0.
n .
0.
0.
0 .
0.
0 .
c.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
51 ,
5 .
0.
0.
0.
0.
0.
5.
1 .
2.
20.
I .
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
* 12*
0.
0.
0.
0.
0.
SD PR S.D. REPRESENTS STUNOAPO Df-VIATIHN. THE DAT! DISTRIfiUTICN UStD IS HIGHLY SKEWED.
-------
sic cone... 2044
TOTAL Ni.lMBtK OF MANUFHC TUR ING PMNTS..,
* NATIONAL TOTALS *
FLCW LFSS THAN HR TQIUL TO MEC UN OF W VT ER USE REGIONS
1968 FLOW CONDITIONS ( 1967 OCL1ARS)
MiNUFiVCTUP ING
FLOW (MGY)
TOTAL CAPf TAL COST
TOTAL AMNUAl OEM COST
TOTAL ANNUAL COST
MAX!MUM
150.
296.
24-3809.
12303.
43942.
M INIMU"J
150.
99.
1306JI.
AVfrRikGF
21940.
219.
160M3.
8330.
28727.
TOTAL
1975.
1298.
1445516.
74966.
258547.
S.O.
101.
67.
40289.
28.19.
7773.
ANNUM COST OF hASTE TREATMENT
REPHCEMENT INTEREST
74966.
72276.
IU305.
TOT&L
258547.
CO
KS
00
COST PANGF
> soonoo.
100000. TO
"50000. TO
10000. TO
0. TO
500000.
I 00000.
50000.
10000.
COST RANGE
> 5000000.
1000001. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
". TO 100"00.
MAX
MIN
A VF
TOT
SD
*1*
0.
0.
0.
0 .
*2*
0.
0 .
0.
0 ,
0.
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
NAXIMUM MINIMUM AVERAGE
0. 0 . 0 .
o. o. b.
o. o. o.
123<53. 10446. 11670.
8315. 5350. 6655.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
0.
C.
0.
298571.
0.
IN IMMM
0 .
0.
0,
156757.
0.
AVERAGE
0.
0.
0.
192736.
0.
TOTAL
0.
0.
0.
35038.
39929.
TOTAL
0.
0,
0.
1734621.
0.
DISTRIBUTION OF TCH^L C4PIT&L CCST FOR TRtSTMFNT ($ 10001
*6* *7* *8* *9*
C.
0 .
0.
., *
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
«.
155.
84.
10?. "
S19.
24.
0.
0.
0.
0.
0.
94
46
58
526
16
*10*
S.D.
0.
0.
0.
1072.
1530.
S.D.
0.
0.
0.
48346.
0.
NUMBER
0.
0.
0.
3.
t .
NUMBER
0.
0.
0.
9.
0.
*11*
*12*
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
"AX
MIN
AVE
TOT
SO
*1*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (t 1000)
44* *5* *6* *7* *B* *9*
0.
0.
0.
0.
0.
0 .
0.
0 .
0 .
0.
0.
0.
0.
n.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
10
4
6
56
2
*10*
*11*
*12*
0.
0 .
r\
•.:' *
0.
0.
3.
1 .
2.
19.
1 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DfVl»TION. THC 0 AT & DISTRI BUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOTAL NUMBER
2045
OF MANUFUCTURING PLANTS...
* NATIONAL T-JIALS *
FLOW LESS THAN OR EQUAL TO MECIVN OF W »T ER USE REGIONS
1968 FLOW CONOITIOkS ( 1967 DCLLARSI
1 6
ING EMPLOYMENT
Fl OW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
285.
151.
199876.
9802.
34851.
MIN IMUM
•50.
28.
80423.
3139.
13615.
WER4GE
136.
72.
126031.
6058.
22064.
TOT4L
2180.
1155.
2016498.
96924.
353020.
S.O.
82.
42.
4561 8.
2598.
8313.
O&M
ANNUAL COST OF hASTE TREATMENT
RFPL»CFMFNT INTEREST
96924.
10') 82 5.
15527C.
TOTAL
353019.
CO
WN
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 10COOOO.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVF.
TOT
SD
*1*
0.
0.
0.
0.
0.
*2*
0.
0 .
0.
0 ,
0.
PAX IMUM
C.
0.
0.
0.
930?.
MINIMUM
o .
0.
0 .
0.
3139.
OISTR [BUT ION OF I
MIN IMUM
0 .
C.
0.
101561 .
965C8.
AVERAGE
0
0.
0.
V ' 9
6058.
NVESTMENT REQUIREMENTS
AVERAGE
0.
0.
0.
168992.
9«002.
TOTAL
0.
0.
0.
0.
06924.
MAXIMUM
0.
0.
0 .
239851.
98979.
DISTRIBUTION OF TOTAL C4PIT4L CCST FOR TREATMENT (t 1000)
3* *4* *s* *6* *7* *8* *9*
TOTAL
0.
0.
0.
2027789.
392007.
0.
<-' *
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
12B
53
8?
1310
2fi
0.
0.
0.
0.
0.
72 .
27.
44 .
706.
17.
0.
0.
0.
0 .
0.
* 10*
0.
0.
0.
0.
0.
*L1*
0.
0.
0.
0.
0.
S.O.
0.
0.
0.
0.
2598.
S.O.
0.
0.
0.
52076.
1194.
NUMBER
0.
0.
0.
0.
16.
NUMBER
C.
0.
0.
IS.
4.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SD
DISTRIBUTION OF ANN !AL 06M TREATMENT COSTS (t 1000)
*4* *5* *6* *7*
0.
0.
0.
0.
0.
0 .
0.
0 .
0.
0.
0 .
0.
0 .
0.
0.
0
0
0
0
0
*10*
*11*
*12*
0.
0.
0.
0.
0.
7.
2.
'i .
69.
2.
0 .
0.
0.
0.
0.
3.
1 .
2.
28.
1 .
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DAT\ DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW L6SS THAN OR EQUAL TC MEDIAN OF W SI ER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
SI C CODE. . . 2046
TOTAL NUMBER OF MANUFHCTURING PLUNTS... 21
M4NUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TPTAL ANNUAl COST
MAXIMUM
?70Q.
3488.
246344?.
142560.
455417.
MUM
25.
?C.
100637.
2345.
15126.
AVERAGE
537.
775.
80«044.
38264.
140377.
TOT<^L
11279.
16265.
16884928.
803538.
2947919.
S.D.
649.
921.
656589.
38086.
121322.
ANNUAL COST OF HASTE
O&M REPLACEMENT
803538. 844246.
TREATMENT
INTEREST
1300138.
TQTHL
2947922,
O
COST RANGE
> 500000.
100000. TO
50000. TO
10000. Tn
0. TO
COST RANGE
> 50000PO.
1000000. Tn
MAX
MIN
AVF
TOT
SD
"AX
MTN
AVF
TOT
SD
500000. TO
100000. TO
0. TO
,1.
0.
0.
0.
0.
0.
*1*
0.
0.
0.
0.
0.
500000.
t 00000.
50000.
10000.
5000000.
1000000.
5COOOO.
1 00000.
*2*
441.
q .
123.
2586.
118.
*2*
7.
0.
2 .
51.
? .
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
MAXIMUM MINIMUM AVERAGE TOTAL
0. 0. 0 . 0.
142560. 106148. 124354. 248708.
87477. 55643. 68804. 275214.
47866. 10055. 27458. 247120.
9488. 2345. 5416. 32496.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
KAX1PUM MINIMUM AVfcRAGE TOTAL
0. 0. 0. 0.
3202472. 1247538. 1853369. 16680323.
965595. 519850. 751786. 3007143.
428373. 1308;>8. 282868. 2262941.
0. 0. 0. 0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT (t 1000)
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (* 1000)
*5* *6* *7* *8* *9*
*10*
S.D.
0.
25747.
13456.
14505.
2953.
S.D.
0.
6582S7.
214781 .
116121.
0.
NUMBER
0.
2.
4.
9.
t.
NUMBER
0.
9.
4.
8.
0.
MAX
MIN
AVF
TOT
SD
*1*
0.
0.
0.
0.
0.
*2*
441.
q .
123.
2586.
118.
*3*
C.
0.
0.
0.
0.
#4*
0.
0.
0.
0.
0.
*5*
0.
0.
0.
r.
0.
*6*
1114.
61.
394.
8264.
296.
*7*
0.
0.
0.
0.
0.
*8*
908 .
31.
286.
6015.
243.
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
*ll*
*12*
"AX
AVF
TOT
I JJ I
SD
0.
0.
0.
0.
0.
7.
0.
2 .
51 .
0.
0.
0.
0.
0.
0.
0.
n.
0.
0.
0.
0.
p.
0.
111.
1 .
29.
603.
30.
o.
0.
0.
0.
0.
25.
' 1 .
7.
150.
7.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE OAT& DtSTRIBUTICN USED IS HIGHLY SKEWED.
-------
* N4TIOIVU TOTALS *
FtOW LESS THAN DP, EQUAL Ri MEDIAN OF WATER USE REGIONS
1968 FLOW CliNUn IONS ( 1967 DOLl 4RS) .*•'•
SIC CODE.. . 205
TOTAL NUMBER OF MANUFACTURING PLANTS... ?74
MANUFACTURING EMPLOYMENT
FLOW (MGYJ
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOT4L 4NNU4L COST
MAXIMUM
2500.
139.
210089.
12268.
MINIMUM
1'VO.
7.
29877.
1310.
5104.
AVERftGb
379.
19.
56777.
2648.
9859.
TOTAL
103922.
5U>7.
15556987.
725558.
2701230.
S .0.
274.
15.
24252.
1187.
4235.
OSM
4NNU4L COST OF
REPLACEMENT
725558.
TRE4TMENT
INTEREST
777849.
1197887.
TOTAL
2701294.
DISTRIBUTION OF OPERATIOC. »NO M4INTEN4NCE COST
CO
en
*""*
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TU
COST R\NGE
> 5000000.
1 000000. TO
500000. TO
100000. TO
0. TO
500000,
100000
50000
10000
5 C 00000
1000000
500000
100000
MAXIMUM
0.
0.
0.
12268.
7419.
0.
0.
0.
262611.
98923.
MINIMUM
o.
o.
0.
1310.
AVERAGb
0.
0 .
u.
12260.
2613.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
0 .
0.
10087»»
37347 .
0.
U.
3 .
136398.
62320 .-
TOTAL
0.
0.
0.
12268.
713291.
TOTAL
0.
0.
0 .
4364741.
15081515.
S.D.
0.
0.
0.
0.
1036.
S.D.
0.
0.
0.
38403.
14415.
NUMBER
0.
0.
0.
1.
273.
NUMBER
0.
0.
0.
242.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
MAX
MIN
AVF
TOT
SO
0.
0.
0.
0.
0.
*2*
14.
1.
3 .
750.
2.
*3*
0.
0.
0.
0.
0.
*'»*
0.
0.
0.
0.
0.
*5*
0.
0.
0.
0.
a.
125.
20.
37.
10021.
14.
*7*
0.
0.
0.
0.
0.
«8*
71.
9.
17.
4786.
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
M4X
MIN
AVE
TOT
SD
0.
0.
0.
0.
0.
*2*
1 .
0.
0.
116 ,
0.
0.
c.
fl.
0.
0.
DISTRIBUTION OF *VNNiJ 4L GtM IRE«TMENT COSTS (1 1000)
*6* *7* * 3*
0.
0.
0.
0.
0 .
0.
3.
0.
n .
K .
I.
1.
368.
I ,
0.
0.
•.) .
0.
0.
3 .
0.
1 .
241 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
o.
0.
0.
0.
SD
OR S.D. REPRESENTS STANDARD DEVIATION. THE DAfA DISTR1BUTION USED !S HIGHLY SKEWED.
-------
sic cone... 2061
TOTAL NUMBER OF MANUFACTUP ING PI (NTS...
* ••JATIONAL TOTALS *
FLCW LESS THAN OR EQUHL TO MEDUN OF W »T ER USE REGIONS
1968 FLOW CONMTICNS ( 1967 DOLLARS)
tNG EMPIOYMENT
FLOW (MC.Y)
TTT&L CAPITAL COST
TOTAL ANNUAI OGM COST
TOTAL ANNUAL CCST
MAXIMUM
3450.
81468.
39821440.
R 182441 .
6.
146.
425130.
185C8.
73005.
AVERAGE
45<57.
3630892.
7 14524.
TOTHL
9544.
225261.
177913728.
12416831.
35011664.
S.O.
504.
11896.
5949940.
467721.
1223035.
12416831.
ANNUAI COST DF WASTE
RFPLACFMENT
8895685.
TREATMENT
INTCREST
1369935C.
TOT4L
350U856.
cn
to
COST RANGE
> SQOOOO.
100000. TO
5000C. TO
10000. TO
0. TO
500000.
I 00000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TH 5000000.
500000. TO 1000000.
100000. TO 5000CO.
0. TO 100000.
OISTRIBUTION OF OPERATION
MAXIMUM MINIMUM
3125120. 560409.
459345. 102396.
95505. 52461.
49440. 18508.
o. o.
AND
MAINTENANCE
AVER/iGF
1094480.
23^710.
71931.
32501.
0.
CCST
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
53758912.
4295588.
755214.
0.
0.
MINIMUM
5231141.
1024012.
573925.
i .
0.
AVERAGE
11758626.
2039353.
655916.
0.
0.
MIN
AVE
TOT
SO
*1*
P.
0.
0.
0.
DISTRIBUTION OF TOT&L C4PITIU CCST FOR TREATMENT (t 1000)
TOTAL
6566880.
4478489.
107B961.
292510.
0.
TOTAL
176379392.
61180608.
2623663.
0.
0.
*2*
4064.
36.
383.
18777.
618 .
*3*
0.
0.
0.
0.
0 .
*4*
21509.
42.
1254.
61429.
3150.
*5*
0.
0.
3.
0.
0.
*7*
8209.
245.
1262.
61844.
13C7.
0.
0.
0.
0.
0.
*8*
6039.
L02.
f2.
35863.
941 .
*9*
0 .
0.
0.
0 .
0.
S.O.
1004518.
122050.
13590.
11597.
0.
S.O.
12108570.
853564.
76456.
0.
0.
*10*
0.
0.
0.
0.
0.
*u*
0.
0.
0.
0.
0.
NUMBER
6.
19.
15.
9.
0.
NUMBER
15.
30.
4.
0.
0.
*12*
0.
0.
0.
0.
0.
M4X
MIN
AVF
TOT
so
*1*
0.
r>.
0.
0.
0.
50.
1 .
6 ,
276.
8.
*3*
0.
0.
0.
0.
0.
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (* 1000)
*6* *7* *8* *9*
695.
3.
50.
2464.
1C3.
0.
0.
0.
0.
0.
2045,
12.
173.
8492.
308.
0.
0.
0.
0.
0.
335.
2.
24.
1184.
49.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR
S 0. REPRESENTS ST&ND&RO OEVI4TIGN. THE 0*T4 OtSTRIBUTICN USED IS HIGHLY SKEWED.
-------
S!C COHF... 206?
TOTAL NUMBER OF MUNUF&C T1IR ING PI UMTS...
* NAT IONAL TOTALS *
FLOW LESS THAN OR EW&L T(] MEOI4N Uf- W 4T ER USE KEGIONS
1961 FLOW CONDITIONS ( 1967 DCLIARS)
1 3
M&NUFSCTURING EMPLOYMfNT
FLOW IMGY)
TPTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAl COST
MAXIMUM
1500.
1459.
2304299.
146353.
438999.
MINIMUM
34.
171860.
6348.
28174.
\VtR\GE
389.
319.
69P505.
341 89.
122137.
TOT4L
6995.
5735.
12465089.
615409.
2198471.
S.D.
380.
355.
535235.
33590.
101198.
OEM
ANMUAL COST OF hASTE
REPLACEMENT
TREATMENT
INTtREST
615409.
623254.
95981I.
TOT4L
2198474.
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
5000C.
I0000.
Cfl COST RANGF
W > 5000000.
1000000. TO 5000000.
500000. TO I 000000.
100000. TO 500000.
0. TO IOOOOC.
M»X
MIN
AVE
TOT
SO
NAXI MUM
0.
146353.
687C6.
45277.
8659.
MAXIMUM
0.
311C8C2.
797603.
43C652.
0.
MINIMUM
0
146353.
52637.
13908.
6348.
AVERAGE
0 .
146353.
58822,
26187.
7680.
DISTRIBUTION OF INVESTMENT REQUIREMENT:
MINIMUM
0.
1055905.
51 1851.
232011 .
0.
AVERAGE
0.
164387?.
62124?.
318662.
0.
TOTAL
0.
146353.
176465.
261869.
30722.
TOTAL
0.
11507108.
3727449.
1593308.
0 .
DISTRIBUTION OF TOTAL C^PlTftL CCST FOR TREATMENT (J 10001
*4* *5* *6* *7* *8* *9*
*10*
S.O.
0.
0.
8649.
1 1428.
1015.
S.D.
C.
680464.
117537.
72365.
0.
NUMBER
0.
1.
3.
10.
4.
NUMBER
0.
7.
6.
5.
0.
*11*
*12*
0.
0.
0.
0.
0.
239.
12 .
64.
1156.
57.
0.
r .
0.
0.
0.
482.
10.
99.
1782.
115.
0.
0.
1.
0.
n.
1046.
I 10.
364.
6551.
?40.
0.
0.
.
0.
0.
537 .
40.
165.
2975 .
126.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
C .
0.
0.
0.
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (t 1000)
*5* *6* *7* *8* *9*
0.
0.
0.
n.
0.
4.
1 .
2 .
27.
1 .
0.
0.
n.
0.
0.
26.
1.
s.
97.
6.
0.
0.
0.
0.
0.
103
4
23
423
24
0.
0.
0.
0.
0.
14.
I .
4.
68.
3 .
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD OEVHTION. THE DVTIV DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 2063
TOTAL NUMBER OF MANUFACTUR ING PUNTS...
* NATIONAL TOTALS *
FLOW LESS THAN OR EQUAL TO NEOUN OF H&TER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARSI
60
MANUFACTURING EMPLOYMENT
FLOW (MOV)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
400.
2574.
3172344.
214 197.
617085.
OSM
ANNUAL
MUM
c.
58.
262135.
H053.
44344.
T OF ViASTE
.CEMENT
WER4GE
125.
786.
1286129.
77085.
240423.
TREATMENT
INTEREST
TOTAL
7498.
47149.
77167776.
4625074.
14425405.
TOTAL
S.O.
104.
670.
740836.
53673.
147463.
4625074.
3858388.
594191 5.
14425377.
CO
COST RANGF
> 500000.
100000. TO
50000. 70
10000. TO
0. TO
COST RANGE
> 5000000.
000000. TO
500000. TO
10 0000. TO
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
500000.
100000.
50000.
10000.
000000.
000000.
500000.
100000.
MAXIMUM
0.
214157.
98652.
454P7.
0.
MAXIMUM
0.
4282662.
981958.
333785.
0.
MINWM
0.
It 36 13.
S2147.
I 1053.
0.
DISTRIBUTION OF I
MINIMUM
0 .
1042676.
509263.
353883 .
0.
AVFRAGF
0.
157861.
73296.
33252.
0.
NVESTMENT RECJ IREMENTS
AVERAGE
0.
21^7688.
858641.
364693.
3 .
TOTM
0.
2367912 .
1392620.
864552.
0.
TOTAL
0.
90202896.
12879612.
1094078.
0.
DISTRIBUTION OF TOTAL CHPIT4L CCST FOR TREATMENT It 1000)
*3*
*5*
*fe*
*7*
*8*
*9*
*10*
*1*
*2*
*3*
DISTRIBUTION OF ANN 'AL OSM TREATMENT COSTS (* 1000)
#4* *5* *6* *7* *8* ' *9*
*10*
S.D.
0.
32296.
1456C.
11751.
0.
S.O.
0.
914498.
173117.
16585.
0.
NUMBER
0.
15.
19.
26.
0.
NUMBER
0.
42.
15.
3.
0.
*11*
*11*
*12*
MAX
MIN
AVF
TOT
so
0.
0.
0.
0.
0.
337.
20.
128.
7673.
82 .
0.
0.
0.
r .
0.
761.
19.
236.
14174.
196.
0.
0.
0.
0.
0.
1351.
160.
6 19.
37150.
2S8.
0.
0.
0.
0.
0.
723 .
62.
303.
18171 .
168.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
c.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
MAX
M IN
AVF
TOT
SO
0.
0.
0.
0.
0.
6.
1 .
3 .
159.
1 .
0.
0.
0.
0.
0.
39.
I.
13.
784.
10.
0.
0.
c.
0.
0.
150.
7.
54.
3223.
38.
0.
0.
•1.
0.
'•> .
19.
2 .
8.
459.
5.
0.
0.
0.
0.
0 .
c.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS ST&MDURD DEVIATION. THE DATA 01STRIBUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE... 207
TOTAL NUMBER OF MANUFACTURING PLANTS...
* N4TIONiL TOTALS *
FLOW LESS THAS OR EQUAL TO MEDIAN OF HATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLL4RS)
87
MANUFACTURING EMPLOYMENT
aOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOT4L 4NNU4L COST
MAXIMUM
3300.
377.
368596.
24811.
70S85.
MINIMUM
AVERAGE
90.
15.
59165.
2410.
9924.
570.
t 4948/.
7812.
26796.
TOTAL
49630.
8200.
13005369.
679603.
2331264.
S.D.
522.
77.
70562.
4701.
13583.
OEM
4NNU4L COST OF hUSTE TRE4TMENT
REPLACEMENT INTEREST
679603.
650268.
1001413.
TOTAL
2331283.
DISTRIBUTION OF OPER4TION 4NO M41NTEN4NCE COST
CO
en
en
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST R4NGE
> 5000000.
1 000000. TO
500000. TO
100000. TO
0. TO
500000.
100000.
50000.
10000.
5000000.
1000000.
500000.
100000.
MAX
MIN
AVE
TOT
SO
0.
0.
0.
0.
0.
*2*
28.
3.
9 .
807.
6.
MAXIMUM
0.
0.
0.
24811 .
9994.
M4XIMUM
0.
0.
n.
460745.
95123.
MINIMUM
0.
0.
0.
10009 .
2410.
AVERAGE
0.
0 .
0.
14942.
5819.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMU1-! 4VERAGC
0. 0.
0 . 0.
0. 0 .
101002. 201580.
73956. 85151.
TOTAL
0.
0.
0.
283899.
395704.
TOTAL
0 .
0.
0.
15320052.
936665.
DISTRIBUTION OF TtlTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6* *7* *8* *9*
0.
C.
0.
0.
0.
0.
•).
0.
0.
0.
0.
0.
0.
0.
0.
210.
39.
SO.
7«S5.
40.
0.
0.
0.
0.
0.
131.
18 .
HO.
4343.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
o.
S.D.
0.
0.
0.
4726.
1979.
S.O.
0.
0.
0.
84720.
7124.
NUMBER
0.
0.
0.
19.
6H.
NUMBER
0.
0.
0.
76.
11.
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
M4X
MIN
AVE
TOT
SO
*1*
0.
0.
0.
0.
c.
2.
D.
1.
62.
0.
*3*
0.
0.
0.
0.
0.
DISTRIBUTION OF \NNU4L 0£M TREATMENT COSTS <$ 10001
*4* #5* *6* *7* *fl* *9*
0.
0.
0.
0.
0.
0.
0.
0,
0.
0.
18.
1.
5.
447.
4.
P.
0.
0 .
0.
0.
5
I.
2 ,
170 ,
L.
0.
0.
0.
0 .
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
c.
*12»
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DAU DISTRIBUTICN USED IS HIGHLY 3KF.WED.
-------
* N4TIUN4L TOTALS *
FLOW LESS THAN 3k EQUAL TO MEDIAN Of WATER USE REGIONS
1968 FLCW CONDITIONS ( 196? UOLIARSI
sic cnor... 2oa
TOTAL NUMBER OF MANU FACTl! P INC PLANTS... 646
MANUFACTURING EMPLOYMENT
FLOW (MGVJ
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL UNNUM COST
MAXIMUM
5500.
1991000.
153259.
MINIMUV
4.
I.
175?C.
819.
3044.
AVERAGE
207.
93.
1 5??46.
6103.
26773.
TOTAL
1334H8.
59784.
101580830.
4 i 94441.
172954^8.
S.D.
379.
273.
195728.
37004.
OEM
4394441.
&NNIJ4L COST OF W^STE TREATMENT
REPLACEMENT INTEREST
5079043.
7821723.
TOT AL
17295200.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CO
Crt
O5
COST P4NGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1 000000. TO
500000. TO
100000. TO
0. TO
500000
100000
50000
10000
5000000
I 000000
500000
1 00000
MAX
MIN
AVF
TOT
SO
*1*
0.
0.
0.
0.
0.
131.
0.
6 ,
4103 .
11.
PA XT MUM
0.
153259.
79513.
47015.
9957.
MINIMUM
0.
147342.
50920.
10453.
819.
AVERAGE
0.
1^0300.
62899.
19521.
3397.
0.
2488750.
4*2397.
DISTRIBUTION OF INVESTMENT REQU1HEMENTS
MINIMUM
0.
1005192 .
506518.
10C09.,.
21900.
D.
1448924.
639584 .
19 J009.
78?36.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TRtAIMtNT ($ 1000)
TOTAL
0.
30060U.
566095.
1659254.
1368609.
TOTlL
0.
1B836016.
24943776.
61762832.
21436560.
*4*
*5*
*6*
0 .
0.
0.
p.
0.
0.
0.
0.
0.
0.
0.
1.
0.
1 .
0.
967
12
90
582 15
1 00
0.
0.
0.
0 .
0 .
1593.
5 .
61.
392 r>9.
35.
*9*
*10*
S.D.
0.
4187.
9694.
8165.
1884.
S.U.
0.
501186.
134734.
96557.
13820.
NUMBER
0.
?.
9.
85.
550.
NUMBER
0.
13.
39.
3^0.
274.
*u*
*12*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
(I.
0 .
0.
0.
0.
0.
0.
0.
0.
MWC
MIN
AVE
TOT
SO
*1*
*2*
*3*
DISTRIBUTION OF 4NNU »L OtM TREHTMENT COSTS (* 1000)
*6* *7* *8* *9*
0.
0.
0.
0.
0.
3.
0.
0.
310 .
0.
0.
1' .
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
• a
0.
0.
1 18
0
4
2867
9
0.
0.
0.
0.
0.
32 ,
0.
? ,
1217.
3.
*10*
*U*
*12*
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LESS THAN 1R F.3UAL TO MEDIAN OF WATER USE RFGICNS
196R FLO»f CONDITIONS ( 1967 DOLLARS)
STC CODE... ?09
TOTAL NUMBER CF MANUFACTURING PLANTS... 599
MANUFACTURING EMPLOYMENT
FLOW tHGY)
TOTAL CAPITAL COST
TOTAL ANNUAL QtM CC1ST
TOTAL ANNUM COST
MAXIMUM
4000.
5600.
20844ft3.
243379.
5C31C5.
MlNIMUM
3.
3.
19135.
669.
3106.
AVERAGE
137.
151.
170898.
10805.
32510.
TOTAL
82144.
90659.
102167984.
64 72421.
19473376.
S.D.
257.
341.
163413.
16393.
36923.
OGM
64724?I.
4NNU4L COST OF WASTE TREATMENT
REPLACEMENT INTEREST
5118398.
7882330.
TOTAL
19473136.
CO
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGF
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAtNTpNANCE COST
MAXIMUM
0.
243379.
17160.
47584.
9828.
MSXIMUM
0.
2605578.
8810C8.
491542.
98978.
MINIMUM
0.
114642.
51518.
10029.
669,
AVERAGE
0.
1^3430,
63935.
18888.
4958,
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1033089.
503475.
100556.
23981 .
WERUGfc
1.
1619295.
616880.
214379.
77113.
TOTAL
0.
653721.
255941.
3569748.
1993109.
TOTAL
0.
9715774.
15421990.
92183088.
10641541.
MAX
MIN
AVE
TOT
SO
0.
0.
0.
0.
0.
*2*
0.
0.
0 ,
0.
0,
DISTRIBUTION OF T3TAL CAPITAL CCST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
0.
0.
c.
0.
0.
407.
0.
11.
6634.
25.
0.
0.
0.
0.
0.
936.
14.
1C1.
60553.
81 .
n.
o.
0.
0.
0.
742.
5.
59.
35180.
59.
0.
0.
0.
0.
0 .
*10*
0.
0.
0.
0.
0.
S.D.
0.
67403.
16?55.
8559.
2199.
S.fJ.
0.
626499.
96594.
99219.
18953.
NUMBER
0.
4.
4.
189.
*ll*
0.
0.
0.
0.
0.
NUMBER
u.
• 6.
25.
430.
136.
*12*
0.
0.
0.
0.
0.
MAX
MIN
W E
TOT
SO
*t*
0.
0.
0.
0.
0.
*2*
0 .
0.
0.
0 .
c.
0.
0 .
0.
c.
0.
DISTRIBUTION OF ANN'J SL OEM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *B* *9*
43.
0.
1.
877.
3.
0.
*
0.
0.
o.
164.
0.
7.
4192.
11 .
0.
0.
0.
0.
0.
37.
0.
2.
1403.
3.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANOARC DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LESS TH*N OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS t 1967 DOLLARS)
SIC CODE... 22
TOTAL NUMBER OF MANUFACTURING PL&NTS... 1021
MANUFACTURING EMPLOYMENT
FLOW (MGYI
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
9000.
3206.
1566488.
93173.
269523.
MINIMUM
35.
14.
49029.
1768.
8247.
•537.
189.
229975.
10142.
39345.
TOTAL
548467.
193383.
234804912.
10354735.
40170928.
S.D.
602.
238.
161930.
8688.
28300.
OEM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
10354735.
t 1740244.
I 8079968.
TOTAL
40174944.
en
00
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
4* l~tfT n A »!/•> F
500000
100000
50000
1 00 00
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
1AX
MIN
4VE
TOT
SO
0.
0.
0.
0.
0.
*2*
MAXIMUM
0.
0.
93173.
4S678.
9899.
MAXIMUM
0.
1958110.
972246.
498866.
99842.
MINIMUM
0.
0.
61295.
10009.
1768.
AVERAGE
.0 .
0.
73546.
17332.
5906.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0 .
1055992.
500314.
101263 .
61286.
AVERAGE
0.
1284152 .
635470.
243250.
84311.
DISTRIBUTION OF TOTAL C4PITU COST FO TREATMENT ($ 1000)
*3*
*4*
42.
0.
(••
3133.
5.
200.
0.
37.
20646.
27.
217
0
9
8437
16
*5*
0.
0.
0.
0.
c.
757.
25.
131 .
119818.
91.
*7*
0.
0.
0.
0.
0.
592 .
14.
81 .
82764.
63.
TOTAL
0.
0.
441277.
5944801 .
3968734.
TOTAL
0.
192&2288.
62276048.
207249088.
4721421.
0 .
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
0.
0.
12106.
7544.
2079.
S.D.
0.
267985.
124608.
100108.
I 1849.
NUMBER
0.
0.
6.
343.
67?.
NUMBER
0.
15.
98.
85?.
56.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
AVF
TOT
SO
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OCM TREATMENT COSTS ($ 1000)
*?* *8* *9*
0.
0.
0.
0.
0.
1.
0.
0.
252.
0.
15.
C.
2.
941.
?.
9.
0.
1.
698.
1.
0.
0.
0.
3.
0.
70.
1 .
7.
6158.
7.
0.
0.
0.
0.
0.
16.
1 .
2.
2305.
1 .
0.
0 .
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LESS THAN 3R EQUAI TO "ED IAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS!
SIC CODE... 221
TOTAL NUMBER OF MANUFACTURING PLANTS... |9<>
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNIJAl COST
MAXIMUM
9000.
MINIM LW
1280798.
81627.
244288.
280.
147929.
4731.
2'* IOC.
AVERAGE
865.
232.
286710.
11289.
47702.
TOTAL
172225.
46113.
57055312.
2? 46607.
9492753.
S.O.
915.
246.
145513.
8469.
26862.
OEM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
2246607.
2852765.
4393256.
TOTAL
9492628.
DISTRIBUTION OF OPFR4TICN AND MAINTENANCE COST
CPST RANGE
> 500000.
CO
CO
100000.
50000 .
1000^.
0.
TO
TO
TO
TO
tnc
500000
100000
50000
10000
> 5000000.
1000000. TU 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*2*
PA XIMUM
0 .
0.
81627.
49678.
S841.
P » XI MUM
0.
160C997.
957721.
4V 3841 .
0.
MINIMUM
0.
0.
81627.
1 0009 .
4731 .
IISTRIBUT ION Of
MINIMUM
:"*.
•.. »
1030500 .
SOOH90.
IH491 t .
0 .
AVERAGE
0.
0.
81627.
16759.
7068.
INVESTMENT REQUIREMENTS
AVERAGE
0.
1270057.
637156.
30 1640,
P .
DISTRIBUTION OF TOTAL C'VPITAL COST FOR IRtATMENl ($ IOOPI
*/,*
*6*
*7*
*8*
TOTAL
0.
0.
BL627.
1323968.
841061 .
TOTAL
0.
3810173.
15928889.
5158C363.
0.
*10*
S.D.
0.
0.
0.
7616.
1442.
S.O.
0.
287611.
115462.
79655.
0.
NUMBER
0.
C.
L.
79.
119.
NUMBER
0.
3.
25.
171.
I).
*11*
MAX
MIM
AVE
TOT
SO
0.
0.
0.
0.
c .
0.
r .
D.
0.
0.
c.
0.
0.
c.
0.
100.
3.
10 »
19BO.
10.
3.
0.
0.
0.
0.
668.
93.
170.
33SJU .
77.
0.
0.
0.
0.
0.
i.12.
r..'. .
106.
211 bb.
58.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0
0
0
0
0
MIM
WF
TOT
sn
0.
0,
0.
*2*
01 STRIBUTI CN OF 4NNUL 0£M TREATMENT COSTS ($ 1000 I
*4* *5* *6* *7* "8*
0 .
0.
n ,
C .
0.
r.
0.
0.
0.
c.
7.
0.
1.
148.
I .
0.
0.
0.
0.
0.
61.
3.
R .
16C3.
6 .
0.
•' .
0 .
0.
0.
*10*
14 .
1.
2 .
495 .
1.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0
0
0
0
0
OP S.O. REPRESENTS STANDARD DEVIATION. T HF DATA. DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LESS THAN aft EdUAL TO MEDIAN Of WATER USE =>£GIONS
1968 FLOW CONDITIONS ( 1967 DOLUPS)
SIC CODE... 222
TOTAL NUMBER OF MANUFACTURING PLANTS... (0 5
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
"AX I MUM
2100.
494.
383380.
16618.
65307.
M INIM UM
125.
29.
70890.
2312.
1146 5.
AVERAGE
444.
1C4.
138292.
22808.
TOTAL
46589.
10900.
14520621.
550795.
2394885.
S .0.
367.
87.
62855.
2823.
10768.
OEM
4NNU*L COST OF WASTE TREATMENT
REPLACEMENT INTFRFST
550795.
726031.
1118087.
TOTAL
2394912.
CO
OJ
O
COST RANGE
> 500000.
100000. TO
50000. TO
1 0000. TO
0. TO
COST R4NGF
> 5000000.
t 000000. TO
500000. TO
100000. TO
0. TO
500000
100000
50000
1000C
5000000
1000000
500000
100000,
DISTRIBUTION OF OPERATION &KO M»INfEN4NCE COST
MAX
•UN
AVF
TOT
SO
*1*
0.
0.
0.
n.
0.
*2*
47.
6.
13.
1354.
7.
MAXIMUM
0.
0.
0.
16613.
8550.
P4XIMUM
0.
0.
0.
479225.
99651.
MINIMUM
0 .
0.
0.
1 0092 .
2312.
AVERAGE
0.
0.
a.
13705.
4641 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
AVERAGE
0.
0 .
10 1615.
38612.
0.
0.
0.
179363.
94069.
TOTAL
0.
0.
0.
95933.
454862.
TOTAL
0.
0.
0.
17398192.
752553.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT (J 1000)
*3*
200.
40.
75.
7885.
32.
0.
0.
'j.
0.
0.
*5*
3.
0.
0.
0.
0.
*6*
0.
0.
0.
0.
Q.
*7*
0.
0.
o.
0 .
0.
*8*
141.
25.
50.
5281 .
23.
*g*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
S.D.
0.
0.
0.
2699.
1601.
S.D.
c.
0.
0.
78271 .
4432.
NUMBER
C.
0.
0.
r.
98.
NUMBER
0.
0.
C.
97.
8.
*12*
0.
0.
0.
0.
0.
MAX
MIN
WE
TOT
sr>
*l*
0.
0.
0.
0 .
0.
*2*
1,
0 ,
1.
62 .
0.
*3*
12.
t .
3.
352.
2.
DISTRIBUTION OF ANNUAL OSM TRE&TMENT COSTS (* 1000)
*7* *8* *9*
0.
0.
0.
0.
0.
0.
0.
0.
0.
1.
0.
0.
0.
0.
0.
0.
•'i .
0.
0.
0.
3.
1.
1 .
137.
0.
0 .
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OP S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOTAL NUMBER
223
OF MANUFACTURING
* NATIONAL TOTALS *
FLOW LESS THAN 3R EQUAL TO INDIAN OF HATER USE RFGIONS
I96rt FLOW CONDITIONS ( 1967 DOLURS)
PLANTS...
100
MANUFACTURING EMPLOYMENT
FL OW ( MGY >
T3T4L CAPITAL COST
T1TAL ANNUAL 0£M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RUJGE
> 5000000.
I 000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TC 100000.
MAX
MIN
AVE
TOT
SD
0.
0.
0.
0.
0.
*2*
c.
0.
0 ,
0.
0.
MAXIMUM
3000.
2200.
156*483.
70580.
269523.
U£M
1723583.
MINIMUM
180.
100.
241718.
688 I.
3757S.
&NNU&L COST OF WASTE
REPLACEMENT
2396627.
AVERAGE
480.
339.
4793? 6.
17236.
78111 .
TREATMENT
INTtRESI
3690805.
TOTAL
48047.
3386 1 .
47932560.
1723583.
7811055.
TOTAL
7811015
DISTRIBUTION OF OPER&TICN *ND M » INr EN 4NCE COST
MAXIMUM
0.
0.
70580.
45366.
5844.
MINIMUM
0.
0.
61295.
10014.
6881 .
AVERAGE
0.
0 .
65937.
16408.
8760.
TOTAL
0.
0.
131875.
1399006.
192710.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MSXIMUM
0.
1958110.
972246.
4R4101.
0.
DISTRIBUTION
* 3* * 4*
0. 217.
0. 11.
0 . 36.
0. 3608.
0. 32.
MINIMUM
0.
1090489 .
500541 .
302148.
0 .
OF TOTAL CAPITAL COST
*5* *6*
0. 757.
0. ' 145.
0. ^66.
0. 26049.
0. ill.
AVERAGE .
0.
1322144.
643599.
3l>8233.
»
FOR TREATMENT ($ 10001
*7* *8*
0. 592.
0 . 36.
0. 177.
0. 17676.
0. 89.
TOTAL
0.
1189929?.
30892752 .
17124000.
0.
*9* *10*
0. 0.
0. 0.
0. 0.
0. 0.
n. o.
s.o.
440.
315.
231393.
10969.
40273.
S.D.
0.
0.
6566.
8506.
800.
S.D.
0.
297717.
142785.
43609.
0.
NUMBER
0.
2.
22.
NUMBER
0.
9.
46.
43.
u.
*11*
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
MIN
AVE
TOT
so
0.
0.
0.
0.
0.
0,
0.
0.
0 ,
0.
DISTRIBUTION OF 4NNU»L O&M TRE»TMENT CuSTS (J 1000)
*3* *A* *5* *6* *7* * 8* *9*
0.
0.
0.
0 .
0 .
9.
I.
2.
186.
t .
0.
0.
0.
o.
0.
50.
5.
12 .
11S3.
a.
o.
o.
0.
0.
0.
11.
2.
3 ,
344.
2.
0.
0.
0 .
0 .
0.
*10*
0.
0.
0.
n.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OP S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 226
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FLOW LESS THAN DP. EQUAL TO MEDIAN OF WATER
CnN°m°NS ' 1967 UOU- »R
USE REGIONS
164
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTM. 4NNU4L 0£M COST
TOTAL ANNUAL COST
MAXIMUM
3250.
3206.
1140405.
93 173.
238004.
MINIMUM
50.
54.
97893.
3994.
16882.
AVERAGE
264.
267.
248458.
13855.
45409.
TOTAL
43314.
43753.
40747120.
2272151.
7447122.
s.o.
350.
344.
137051.
10834.
28165.
ANNUAL COST OF HASTE
06M REPLACEMENT
2272151. 2037355.
TREATMENT
INTEREST
3137526.
TOTAL
7447032.
DISTRIBUTION OF OPERATION AND HUNTENANCfc COST
to
O3
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
n. TO
COST R4NGE
> 5000000.
1000000. TO
500000. TC
100000. TO
0. TH
500000
100000
50000
10000
5000000,
1000000
500000
100000.
MAX
MIN
AVE
TOT
SP
0.
0.
r.
0.
0.
*2*
0,
0,
0,
0.
0 ,
MAXIMUM
n.
0.
93173.
46499.
9899.
MAXIMUM
0.
14255C6.
791711.
48 1027.
0.
MINIMUM
0 .
0.
62539.
10040.
3994.
AVERAGE
0.
0 .
77856.
18191,
7264.
DISTRIBUTION Of INVESTMENT REQUIREMENTS
MINIMUM
0.
1055992.
500314.
122367.
0 .
AVERAGE
C.
1240749.
616969.
266654.
3 .
TOTAL
0.
0.
155712.
1564394.
55208?.
TOTAL
0.
24S1498.
9254531.
39198192.
0.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*6* *7* *8* *9*
0.
0.
0 .
0.
0.
83.
2.
8.
1256.
9.
3.
0.
0.
0.
0.
603.
63.
t 50.
24608.
74.
0.
0.
0.
0 .
n.
454.
33 .
91.
14883.
55.
0.
0.
0.
0.
o.
*io*
0.
0.
0.
0.
o.
S .D.
0.
0.
21661.
7941.
1608.
S.O.
0.
261285.
9 1490 .
89750.
L.
NUMBER
0.
0.
2.
86.
7^.
NUMBER
0.
/..
15.
147.
0.
*11*
0.
0 .
0.
0.
0 .
*12*
0.
0.
0.
0.
0.
MIN
WF
TOT
SD
*t*
0.
0.
0.
0.
0.
C .
0.
0.
0 .
n.
*3*
0.
0.
0.
0 .
C.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS (* 10001
*6* *7* *8*
8.
i.:.
1.
152.
1.
0.
6.
o.
0.
0 .
70.
3.
10.
1627.
8.
0.
0.
0.
0.
0 .
16.
1.
3 .
494.
2 .
0.
0.
0 ,
0.
0.
*10*
0.
n.
0.
0.
0.
*11*
0 .
o.
o.
0 .
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. P.EPRESENTS STANDARD DfcVlATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LESS ThUN OR FQUM. TO KEOUN OF M »T ER USE "EGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
SIC CODE.,. Z4
TOTAL NUMBER OF MANUFACTURING PUNTS... 405
MANUFACTURING EMPLOYMENT
FLOW 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TC
100000. TO
0. TO
500000
1 00000.
50000
1 0000
5000000
1 000000
500000
100000
MAX
MIN
AVE
TOT
SD
*1*
0.
0.
0.
0.
0.
*2*
0.
0.
0.
o.
0.
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
MINIMUM AVER%Gfc
0. 0. M .
235249. 235249. 235249.
82270. 50092. 61082.
4807<;. 10020. 17091.
9970. 2150. 6661.
PAXJMUM
0.
3635541.
983634.
4Q6428.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0 .
1039375.
•500791 .
100665.
0.
AVFRAGE
0 .
1478944.
673431.
282397.
0.
TOTU
0.
235249.
488658.
3195966.
1392194.
TOTAL
0.
14789440.
31651248.
98274160.
0.
DISTRIBUTION OF TOT&L ^PITU CCST FOR TREATMENT ($ 1000)
*4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
752.
3.
26.
10476.
45.
0.
0.
1.
0.
1C 64.
48.
1 50.
6C853.
89.
0.
0.
0.
0.
0.
1073
?9
1 10
44441
81
0.
n.
o.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
0.
0.
11675.
8079.
2201.
S.D.
0.
787362.
130145.
90217.
0.
NUMBER
0.
1.
H.
187.
209.
NUMBER
0.
10.
47.
348.
0.
0.
0.
0.
0 .
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SO
*1*
0.
0.
0.
0.
0.
*?*
0.
0.
0.
0.
0 .
*3*
0.
n.
o.
0.
0.
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (* 10001
*5* *6* *7* *8* *9*
49.
0.
2.
858.
3.
3.
0.
0.
9.
0.
145.
1.
8.
3197.
9.
0.
0.
0.
0.
0.
41.
1 .
3.
12 '57,
3 .
0.
0.
0.
0.
0 ,
*10*
a.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO Oft S.D. REPRESENTS ST4NOHRD DEVIATION. THE OST* OISTRIBUTICN UStO IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LESS TH*N OR EQUAL TO PEDUN UF W »T £R USE - EG IONS
1968 FL3W CONDITIONS < 1967 DOLLARS)
TOTAL NUMBER OF M4NUF\CTURING PUNTS... 862
MANUFACTURING EMPLOYMENT
Fl OW (MGY)
TOTAL CAPIT4L COST
TOTAL ANNUAL 0£M COST
T1TAL ANNUAL COST
MAXIMUM
4000.
•56563.
27781984.
2068368.
5590107.
MI NIMUM
12.
8.
25804.
898.
4190.
447.
2449.
1435260.
I 01696.
283989.
TOT4L
385511.
2111424.
1237194240.
87661728.
244798864.
S.D.
540.
5615.
3035145.
214077.
596094.
flCM
87661728.
ANNUAL COST OF WASTE TREATMFNT
REPLACEMENT INTEREST
61859696.
95263904.
TOF4L
244785328.
07
as
UN
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000
100000
50000
10000
5000000
I 000000
500000
100000
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
MIN
iVE
THT
so
*I*
0.
0.
0.
0.
0.
*2*
0 .
0.
0.
0 .
0.
KAXI MUM
2068368.
485575.
99528.
49615.
9993.
MAXIMUM
34727472.
4989713.
995335.
493215.
99799.
506185.
100338.
50052.
10121.
898.
AVER4GE
936B27.
210519.
71880.
26794.
5L75.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5027460.
1005977.
500127.
100205 .
32254.
AVERAGE
13634865.
2107699.
753808.
221790.
77275.
TOTAL
34662592.
34314560.
10135070.
7261188.
1293827.
TOTAL
735742720.
630202112.
113825056.
60105040.
6722966.
DISTRIBUTION OF TOT*L C*PIT
' - *
0.
0.
9994.
1 .
387.
258332.
1056.
0.
0.
f
•
0.
a.
3816.
25.
502.
4324 <53.
545.
0.
0.
0.
0.
0.
5177.
12.
518.
364328.
697.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
NUMBtP
37.
163.
141.
271.
250.
NUMBER
5<,.
299.
151.
271.
87.
*11*
9668.
2169.
4919.
182020.
2146.
*12*
0.
0.
0.
0.
0.
MAX
MIN
4VF.
TOT
sn
*1*
0.
0.
0.
0.
0.
*2*
0.
0.
0.
o.
0.
o.
DISTRIBUTION OF ANNUAL 0£M TREATMENT COSTS (* 1000)
*7* *8* *9*
321.
0.
18.
12295.
35.
a.
o.
o.
D.
0.
937.
1.
53.
46048.
81.
0.
0.
0.
243.
1 .
17.
12028.
27.
0.
0 .
0.
0.
0.
*10*
0.
0.
0.
0.
0.
1019.
213.
467.
17291.
210.
*12*
0.
0.
0.
0.
0.
<;n OR S.D. REPRESFNTS S^NDARD DEVOTION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODF...
THT&L NUMBFP
2f I
OF MSNUFrCTURINC PLANTS..,
* ^ATIONAL TOTALS *
FLOW LESS THUN OR FQUAL TO MEDIAN OF WATEP USE REGIONS
1068 FLOW CONDITIONS ( IS67 OOLI ARS)
MANUFACTURING EMPLOYMENT
Ft OW (MGY)
TPT&L CUPITU cnsr
TOTAL ANNUAL 0£M COST
TOTAL ANNI.IAI COST
3000.
56563.
27781S84.
5590107.
MINIMUM
25C.
460 1 .
5249210.
3 506 < 8.
1017288.
192H4.
13183? <54.
^67749.
TOTAL
34108.
713504.
4H7781888 .
32108576.
94057008.
S.O.
675.
13447.
6520109.
450061.
1260661.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
32108576.
^438^008.
7559134.
TOTAL
94056848.
C75
V*
COST RANGl-
> SOOOOO.
100000. TO
50000. Tf)
10000. TO
0. TO
500000.
ICO^OO.
50000.
(0000.
COST RANGF
> 5000000.
1000000. TO ^000000 .
5000CO. Tf> 1000000.
IPOOOO. TO 500000.
0. TO 100000.
479^,47.
0.
0.
0.
MAXIMUM
34727472.
0.
0.
0.
0 .
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MINIMUM 4VtR4GF
507910. 1012801.
350638. 416688.
o. y .
o. o.
o. o.
DISTRIBUTION 01 INVESTMENT REQUIREMENTS
MINIMUM
656151.? .
0 .
0.
16479100.
0.
0.
0 .
n.
TOTHL
2835843?.
3750194.
0.
0.
0.
TOTAL
6097_'6720.
0 ,
0.
0 .
0.
S.O.
423852.
51418.
0.
0.
0.
S.O.
8150220.
0.
0.
0.
0.
NUMBER
28.
V.
0.
0.
0.
NUMBER
37.
0.
0.
('.
c .
*l*
*?*
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENl ($ 1000 I
*/>* *5* *6* *7* *3*
*10*
*12*
MIN
*VE
TOT
SD
0.
0.
0.
0.
0.
0 .
c.
0.
0 .
0.
0.
0.
P.
0 .
0.
9904.
978.
3758.
13-50 53.
2537.
0.
0.
0.
0.
0.
3415.
939.
1870.
69199.
70C .
0.
0.
0.
0.
0.
5177.
1163.
2635 .
975 11.
1149.
0 .
0.
0 .
0.
0.
0.
0.
0.
0.
0.
9668.
2169.
4919.
182020.
2146.
0.
0.
0.
0.
0.
"•4X
MIN
.WE
TOT
SD
*1*
O.
0.
0 .
0.
0.
*2*
r.
o.
c,
0 .
0.
0 .
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (* 10001
*5* *6* *7* *B* *9*
321 .
37.
119.
4421 .
0.
0.
0.
0 .
0.
5CU
0
-------
SIC CODE... 262
TOTAL NUMBER (IF MANUf ACTUR ING PLANTS...
* NATIONAL TOTALS *
FLOW LESS THAN DP, EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 OCLLARS1
274
MANUFACTURING EMPLOYMF.NT
FL OW ( MGV !
TOTAL CAP I TAL COST
TOT4L ANNUAL OEM COST
TOTAL ANNUAL COST
CO
0}
Q>
COST RANGE
> 500000.
130000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000
I 00000
50000
10000
50COOOO
1000000
500000.
100000
MAX
MIN
AVF.
TOT
SO
*1*
0.
0.
0.
0.
0.
*2*
0.
0 .
0.
0.
0.
MAXIMUM
4000.
21559.
6639128.
772 iniS.
1599216.
O&M
13880016.
MINIMUM
75.
199.
310102.
14804.
54 t«7.
ANNUAL COST OF WASTE
REPLACEMENT
22243216.
AVERAGE
554.
320 7.
1623593.
1 23650.
529850.
TREATMENT
INTEREST
34254544.
TOTAL
151858.
878664.
444864512.
33880016.
90378832.
TOTAL
90377776
DISTRIBUTION OF OPERATICN AND MAINTENANCE CCST
MAXIMUM
772386.
435575.
99528.
49332.
0.
MINIMUM
506185.
100759.
50052 .
14804 .
0.
AVERAGE
626449.
209420.
70653.
34857 .
,1 *
TOTAL
3132243.
21989136.
6005527.
2753724.
C.
DISTRIBUTION OF INVESTMENT REQJIREMENTS
MAXIMUM
8298910.
498S713.
989594.
476414.
0.
DISTRIBUTION
*3* *4*
0. 1866.
0. IB.
0. 283.
0. 77416.
0. 333.
MINIMUM
5027460 .
1005977.
517233.
387628.
* ' 9
OF TOTAL CAPITAL CCST
*5* *6*
0. 2501.
0. 1 81 .
0. /48.
0. 205030.
0. 453.
AVERAGE
6666376.
2171636.
775830.
422424.
C .
FOR TREATMENT ($ 1000)
* 7* * 3«
0. 2309.
0. III.
0. 593,
0. 162<.28.
0. 4.'5.
TOT AL
86662896.
4109H4112.
51204800.
1267271.
0 .
*9* *10*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
s.o.
646.
3974.
1205358.
118908.
270864.
s.o.
120060.
91977.
14403.
9440.
0.
S.D.
1162494.
1042634.
124940.
47408.
0.
NUMBER
rj>.
105.
85.
79.
0.
NUMBER
13.
192.
66.
3.
0.
*ll*
0.
0 .
o.
0.
0.
0.
0.
0.'
0.
0.
MAX
MtN
*VE
TOT
SO
0.
0.
0.
0,
0.
*2*
0 .
0.
r.
o.
0.
0.
0.
0 .
0.
DISTRIBUTION OF ANNUAL OUM TREATMENT COSTS <$ 1000»
*5* *6* *7* *B* *9*
124.
2.
18.
4976 .
19.
0.
0.
0.
0.
524.
1C.
66.
23466.
0.
0.
0.
0 .
124.
3 .
20.
5418.
19.
0.
0.
0.
0.
0.
*10*
0.
0.
C.
C.
0.
0.
0.
0 .
0.
0.
#12*
0.
0.
0.
C.
0.
SO OR S.D. PFPRESPNTS STANDARD DEVIATION. THE DAT\ DISTRI BUTICN USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLCW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 HOW CONDITIONS ( 1967 DOLLARS)
SIC CODE... 263
DTAL NUMBER OF MANUFACTURING PLANTS... 198
MANUFACTURING EMPLOYMENT
FlOW 50000C.
CO
O5
100000.
50000.
10000.
0.
TO
TO
TO
TO
500000.
I 00000.
50000.
10000 .
MAX
COST RANGE
> 5000000.
1000000. TP 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
141 4486.
3U546.
98297.
49035.
9812.
MAXIMUM
14331347.
455S767.
995335.
4-33215.
0.
MINIMUM
557087.
100338.
50393.
10479.
5326.
AVERAGE
792997.
178079.
73607.
29936 .
H006.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
M1NI M UM
8C23343.
1036380.
5o:'l27.
160128 .
AVERAGE
9838912.
20D8036.
765806.
365009.
0 .
TOTAL
3171987.
H369692.
3901185.
2544531.
72058.
TOTAL
39355648.
204819728.
49011568.
10220254.
0.
S.D.
416263.
61726.
14701 .
10448.
1700.
S.O.
3005872.
881336.
13 19 1 1.
95366.
0.
NUM BER
4.
47.
53.
85.
9.
NUMBER
4.
102.
64.
28.
0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREHTHtNT <$ 10001
M4X
MIN
AVE
TOT
so
*
0.
0.
0.
0.
0.
*2*
0.
0 .
0.
0 .
0 .
*3*
r .
0.
0.
r,.
r.
*/,*
3878
4.
200
3?6'34
331
I*
0.
0.
0 .
0.
0.
*'-*
3816.
30.
579.
1 14645.
453.
*7*
0.
.
0.
0.
0.
*3*
3771 .
43.
446.
88304.
430.
*9*
0.
0.
0.
0 .
0.
*10*
0.
0.
0.
0.
0.
*u*
0.
0 .
0.
0.
0 .
*12*
0.
0.
0.
0.
0.
DISTRIBUTION OF ANNUAL U&M TREATMENT COSTS t$ 1000
MAX
MIN
4VE
TOT
SO
*1*
0.
0.
0.
0.
0.
*2*
0 .
0.
0,
0 .
0.
*9*
*10*
*I2*
0.
0.
r-.
0.
r .
235.
0.
13.
2614.
22.
0.
3.
0.
0 .
0.
937.
3.
t3.
12474.
89.
0.
0.
0.
0 •
0.
243
2
15
2971
22
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0 .
0.
0' .
0.
0.
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE 04T\ DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 264
TTITAL NUMBER OF MANUT/VCTUP ING PLANTS...
* NATIUNAL TOTALS *
FLCW LESS THAN 01! EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDIT ICNS ( 1967 DOLLARS)
159
MANUFACTURING EMPIOYHFNT
FLOW (MGY)
T1TAL CAPITAL COST
Ti)TAL ANNUM O£M COST
THTAL ANNUAL COST
CO
C5
00
COST RANGE
> 500000.
100000. TO
50000. TO
1 0000. TO
0. TO
COST R.INGE
> 5000000.
1000000. TO
500000. TO
100001. TO
0. TU
500000
I 00000
50000
10000
50COOOO
1000000
500000
1000 )0
MAX
MTN
AVE
TOT
sr>
*i*
o.
0*
0.
0.
u.
0.
0 .
0.
0.
0 ,
MAXIMUM
4000.
1358.
452043.
49 f 15.
105386.
06 M
1457563.
OiSTR
MAX IMUM
0.
II.
0.
49615.
9957.
MINIMUM
65.
8.
25804.
893.
4100.
ANNUAL COST OF V«A3TE
REPLACEMEN 1
1001 353.
AVERAGE
480.
156.
125950.
,' , 9167.
25164.
TREATMENT
INTFRES1
1542082.
TOTAL
76262.
24850.
20027056.
1457563.
4001003.
TOTAL
4000997
IBUriON OF OPERATION A^0 MAINTENANCE COST
M INIMU*-'
0.
0.
0.
10121 .
898.
AVERAGE
i. .
0 .
0.
17833.
5307.
TOTAL
0.
0.
0.
873799.
5B3785.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
0.
565053.
460970.
99799.
DISTRIBUTION
3* ***
C. 99.
0. 1.
0 . 14.
0. 2171.
0. 15.
MINIMUM
0 .
, 0.
508249.
101655 .
32254 .
OF TOTAL CAPITAL COST
* 5* * 6*
D. 353.
0. 25.
C . 1 !2.
0. 17856.
0. 60.
AVERAGt
C'.
0 .
540744.
178920.
74274.
FOR TREATMENT (J 1000)
* 7* * 8*
.
0.
o.
39.
1 .
7.
1174.
6 .
0.
0.
0.
0.
0 .
0.
0.
0.
0.
u.
C.
e.
o.
o.
o.
*10*
0.
0.
0.
0.
0.
*11*
0.
I'.
0.
0.
0.
*12*
0.
0.
0.
o.
0.
sr>
OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION UStD IS HIGHLY SKEWED.
-------
SIC CODE...
TOTAL NUMBCR
265
OF MANUFACTl'R ING
PLANTS...
* NATIONAL TOTALS *
Lfss THAN Oft EQUAL ro MEDIAN OF WATER u
1968 FlflM CONDITIONS ( 1967 DCLL ARS I
142
REGIONS
MANUFACTURING EMPLOYMtNT
FLOW (MGY)
TOTAL CAPITAL COST
TOT4L ANNUM. 0£M COST
TOTAL ANNUAL COST
MAXIMUM
1770.
576.
383621.
25238.
71599.
MINIMUM
AVfRAGL
193.
S.
380JO.
15:10.
6360.
1233/0.
6210.
21MV8.
TOTAL
569f4.
11580.
17518560.
881886.
3106704.
S .0.
250.
89.
69442 .
OEM
ANNUAL COST OF hA3TE
REPLACEMENT
881386. 8/S9.'8.
TREATMCNT
INTtREST
1341(928.
TOTAL
31067'il,
O
co
COST RANGfc
> 500000.
100000. TO
^0000. TO
10000. TU
0. TO
UISTRIBUtlON OF OPFRftTICN 4ND WAINTENANCF COST
500000.
100000.
50000.
10000.
COST R1NGE
> 5000000.
1000000. TO 5000000.
500OOO. TO 1000000.
100000. TU 5COOOO.
0. TO 100000.
MAX
MIN
AVE
TOT
SO
*2*
I«AXIMUM
O.
0.
0.
25238.
995s.
MAXIMUM
0.
0.
0.
479526.
98592.
M IN IM UM
0 .
(J.
0.
1118.?.
153r.
AVtRAGE
U.
0 .
0.
]549b.
4599.
DIST&IBUT ION 0(- INVESTMENT REQUIREMENTS
MINIMUM
0.
' ' •
0.
100?05.
47538.
AVERAGE
o.
0 ,
0 .
18743V.
80209 .
TOTAL
0.
0.
0 .
325405.
556481 .
TOTAL
o.
o.
o.
18369056.
3529185.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 100 )
*/,#
*5*
c.
0.
0.
0.
0 .
c.
0 .
0 .
0.
0 .
0.
0.
c .
0.
c.
0.
0.
0.
0.
U.
0.
0.
0.
*
0.
233
26
ao
11329
42
*7*
0.
0.
0.
0 .
0.
* 8*
151 ,
12.
6190 ,
2V.
*9*
*1U*
S .0.
u.
0.
0.
3640.
2112.
S.D.
0.
0.
0.
85293 .
1 32 9 1 .
NUMBER
0.
0.
<>.
21 .
121.
NUMPER
0.
iJ.
0.
9fl .
44.
*11*
*12*
0.
0 .
0.
0.
0.
0.
0.
U.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
0.
0 .
MAX
MIN
Wf
TOT
SO
*l*
0.
0.
0,
0.
0.
DISTRIBUTION OF ANNUAL OGM TREATMENT COSTS (i 1000)
*3* *4* *5* *6* *7*
0 .
0.
0.
•J 0
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0 .
20
1
4
630
4
C.
0.
0.
0.
0 .
5.
I.
2 .
251.
1 .
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0 .
0.
0.
0.
0.
*12*
0.
0.
0.
0 .
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LOSS THAN OR E'JUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
StC CODE... 266
TOTAL NUMBER OF MANUF'CTUPING PLANTS... 52
MANUFACTURING EMPLOYMENT
FL OH (MGY I
TOTAL CAPITAL COST
TOTAL ANNUAL 0£M COST
TOTAL ANNUAL COST
MAXIMUM
1620.
1616782.
103550.
307915.
MINIMUM
45.
70.
158282.
5986.
26C88.
AVERAGE
259.
590.
468586.
24612.
841i!3.
TOTAL
13475.
30694.
24366496.
1279821.
4374381.
S.O.
349.
893.
330592.
22861.
64741.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1279821.
121R324.
1876219.
TOTAL
4374364.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CO
-3
o
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000.
100000.
50000.
10000.
50COOOO.
1 000000 .
500000.
1COOOO.
MAX
MIN
AVE
TOT
SD
*1*
0.
0.
0.
0.
0.
*2*
0.
0,
0.
0,
0 ,
MAXIMUM
0.
103550.
87318.
45995.
9993.
MAXIMUM
0.
2020977.
866662.
492 I 48.f
0.*
MINIMUM
0.
102584.
57643.
10187.
5986.
AVERAGE
0.
103067.
76122.
20643.
8153.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1176368.
556269.
197853.
0 .
AVERAGE
p.
1687977.
665930.
345922.
0.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*6*
896.
102.
279.
14505.
*7*
0.
0.
0.
0.
0.
*8*
720.
57.
190.
9862,
150.
TOTAL
0.
206134.
228365.
763799.
81532.
TOTAL
0.
8439885.
11986739.
10031738.
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.O.
0.
680.
16122.
8427.
1292.
S.D.
0.
351538.
92047.
87071.
0.
NUM BER
0.
2.
3.
37.
10.
NUMBER
0.
5.
18.
29.
0.
*ll*
0.
0.
0.
0.
o.
*!2*
0.
a.
o.
c.
0.
MAX
MIN
AVE
TOT
SO
*1*
0.
0.
0.
0.
0.
*2*
0 «
0.
0 .
3.
0.
*3*
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
DISTRIBUTION OF ANNUAL O&M TREATMENT COSTS 1$ 1000>
*7*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE
*5*
0.
f) .
0.
. 0.
0.
"-4
DATA
*6*
fl5.
4.
19.
10 10.
19.
DISTRIBUT
19.
2.
5 .
270.
4 .
*9*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LESS THAN OR EQUAL TO VEOIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS » 1967 DOLLARSI
SIC CODE... 28
TOTAL NUMB6R OF MANUFACTUPING PLANTS...
MANUFACTURING EMPLOVMENT
FL OW ( MG ¥ »
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAI COST
v^ \c\*\x x* ^
^ \fVT\x :
'
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO ^0000.
0. TC 10000.
CO
•a
M COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1 000000.
100000. TO 500000.
0. TO 100000.
*l* *2*
MAX 33690. 1642.
MIN 0. 2.
AVF 276. 39.
TOT 106464. 47280.
SD 2201. 90.
MAXIMUM
28600.
81138.
55021232.
3499223.
10486918.
OEM
71392672.
DISTR
MAXIMUM
3499223.
40Q l 34.
99113.
49662.
9934.
MINIMUM
25. -,
5. >"
88S1.
820.
1947.
ANNUAL COST OF WASTE
REPLACEMENT
43379376.
AVERAGE
550.
870.
610547.
50241.
127791.
TREATMENT
INTEREST
66804208.
TOTAL
781889.
1235840.
867587,584.
71392672.
181591424.
TOTAL
181576256
IRUTION OF OPERATION AND MAINTENANCE CCST
MINIMUM
575777.
100491.
500?4.
10021.
820.
AVERAGE
1122310.
186179.
68495 .
23622.
5742.
TOTAL
16834656.
22155328,
13082584.
17220240.
2107378.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
66776523.
4^56188.
994699.
4976S8.
99025.
DISTRIBUTION
*3* *4*
4216. 8192.
21 . 0.
213. 85.
759143. 121038.
273. 341 .
MINIMUM
5055837.
1002667.
500739.
100448.
I 1 10 I.
OF TOTAL CAPITAL CCST
*5* *6*
412. 2755.
0. 0.
33. 334.
20346. 1018SS.
36. 307.
AVERAGE
13813324.
2004122.
702036.
252034.
53656.
FCR TREATMENT 1$ 1000
*7* *8*
81. 6869.
0.
36. 253.
3847. 206886.
8. 453.
TOTAL
276266496.
420865792.
188847584.
1 83529936.
9121590.
1
* 9* * 1 0*
35. 0.
0. 0.
8. 0.
780. 0.
7. 0.
S.O.
1398.
3686.
2090843.
143842.
408459.
S.D.
830301.
89680.
13900.
10530.
2539.
S.D.
16940432.
1034506.
139722.
105543.
29662.
NUMBER
15.
119.
191.
729.
367.
NUNbER
20.
210.
269.
752.
170.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS 1$ 1000)
*>;* *6* * 7*
MAX
MINI
AVF
TOT
SD
444.
0.
11.
4343.
33.
25.
0.
I .
1369.
1 .
982.
0.
25.
30993.
64.
371.
0.
6 .
7953.
16.
1202.
0.
23.
14524.
72.
288.
0.
19.
5763.
27.
15.
0.
2.
225.
2.
484.
0 .
7.
6036 .
24.
13
0
2
188
}
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THF DATA OISTRIBUTICN UStO IS HIGHLY SKEWED.
-------
SIC CODE... 7812
TOTAL NUMBER CF MANUFACTOR ING PLANTS...
* N4TICNSL TOT4LS *
FLOW LESS THAM DP EQUAL TO f ED IAN OF kATER USE REGIONS
196R Fl.Ori CONDITIONS ( 1967 DOLLARS)
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAl CAPITAL COST
TflTAL ANNUAL OEM COST
TOT&L 4NNUM COST
2500.
2182.
948P26.
160571.
277158.
MINIMUM
87.
37.
7139C.
470?.
13769.
AVtRAGE
670.
767.
391448.
59721.
109435.
TOTAL
21443.
24544.
12526327.
1911075.
3501914.
s.o.
689.
698.
266781.
51023.
84798.
^NNU&L COST OF W4STE
QGM REPLACEMENT
1911075. 626316.
TREATMENT
INTEREST
964527.
TOTAL
3501917.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO
50000. TP
10000. TC
0. TO
5COOOO.
100000.
50000.
10000.
<1 COST R4NGE
M > 5000000.
IOPOOOO. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO inOOOO.
MAX
M IN
AVE
TOT
SO
MAXIMUM
0.
160573.
S3289.
47642.
8260.
MINIMUM
105578.
54100.
10791.
4702 .
AVERAGE
0.
136908.
66724.
22386.
64R1 .
0.
12 0914 .
8671R6.
468756.
96377.
TISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1030760 .
519952 .
149029.
96377.
1123390.
68635-* .
269588.
96377.
TOTAL
0.
1095267.
467069.
335783.
12962.
TOTAL
0.
6740342.
5490834.
45829R8.
36377.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT {$ 1000)
*3* *4* #5* *6* *7* *fl* *9*
0.
0.
0.
0.
0.
52 .
•».
20 .
646.
15.
706.
65.
30R.
9867.
195.
191.
4.
A3.
2013.
58.
0.
0.
0.
o.
o.
0.
0.
0.
0.
0.
0.
0.
•J.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.O.
0.
20561.
12475.
12595.
2516.
S.O.
0.
100715.
128530.
I 13370.
0.
NUMBER
0.
8.
7.
15.
2.
NUMBER
0.
6.
8.
17.
1.
*11*
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
AVE
TOT
*t*
*2*
*3*
DISTRIBUTION OF 4NWJ8L OEM TRE«TMENT COSTS (t 1000»
#4* *5* *6* *7* * 8* *9*
0.
n.
0.
0.
0.
2.
0.
1 .
35.
1 *
137.
4 .
51.
1629.
44.
21.
1 .
8.
247.
7.
0.
0.
0.
0.
n.
0.
0.
0.
0.
0.
0.
0.
• ' *
0.
0.
0.
0.
0.
0 .
0.
0 .
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* N»TICNM TOT4LS *
FLOW LESS THAN OR EQUAL TO MEDIAN OF KATER USE REGIONS
IS»68 FLOW CONDITIONS ( 1967 DOLLARS)
SIC CODE... 2813
TOTAL NUMBFR OF MANUFACTURING PLANTS... 115
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL ctm
TOTAL AMNUAI 0£M COST
TOT4L 4NNU4I COST
MAXIMUM
1500.
MINIMUM
1 1 79 1ST.
?05684.
355441.
AVERAGF
56201.
3850.
llOOt.
322.
2 23 72 4.
27724.
56137.
TOTAL
12435.
37019.
25728304.
3188220.
6455745.
S.D.
212.
419.
180887.
304ti6.
53331.
3188220.
4NNU4L COST OF VUSTE
RFPLACEMENT
1286415.
TRE4TMENT
INTFREST
1931078.
TOTAL
6455713.
COST R&NGE
> 500000.
100000. TO
50000. TO
IOOOP. TO
0. TO
DISTRIBUTION OF OPERATION 4IMJ MMNTEM4NCF COST
5COOOO.
100000.
50000.
10000.
MAXIMUM
0.
P05684.
917S4.
46945.
<3681.
MINIMUM
0.
H880?.
50330.
10149.
3850.
AVCRAGC
0.
146656.
68673,
22807.
6244.
TOTAL
0.
586626.
824082.
1596463.
181069.
S.D.
0.
40543.
14808.
9901 .
1545.
NUMtJER
0.
4.
12.
70.
29.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
COST RWJGE
> 5000000.
1 000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
0.
1K
-------
* MSTIONAL TOTALS *
FLOW LESS THAN 3R EQUAL TO MEDIAN OF feATER USE REGIONS
1968 FLOW CONDITIONS C 1967 DOLLARS)
SIC CODE... ?815
TOTAL NUMBER CF MANUFACTURING PLANTS... 71
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUM COST
MAXIMUM
1000.
778.
809451.
67905.
170705.
06M
879649.
MINIMUM
26.
13,
6703?.
2490.
11004.
ANNUAL COST OF hASTE
REPLACEMENT
788755.
AVERAGE
179.
127.
222185.
12389.
40607.
TREATMENT
INTEREST
1214682.
TOTAL
12703.
8989.
15775106.
879649.
2883073.
TOTAL
2883085.
s .D.
218.
155.
158594.
11669.
31617.
DISTRIBUTION OF OPERATION AM) MAINTENANCE COST
COST R ANGE
> 500000.
100000. TO
50000. TO
1 0000. TO
0. TO
c*
•J COST RANGE
*" > 5000000.
1 000000. TO
500000. TO
100000. TO
0. TO
*1*
MAX 57.
MIN 6.
AVF 14.
TOT 1029.
SO 10.
5COOOO.
100000.
50000.
10000.
5000000.
1000000.
500000.
100000.
*2*
51 .
3.
12.
847.
10.
MAXIMUM
0.
0.
*>7905.
44460.
9592.
MAXIMUM
0.
1092757.
9858C4.
498580.
93687.
,•>
DISTRIBUTION
* 3* * 4*
224. 83.
21. 2.
66. 14.
4719. 984.
44. 16.
MINIMUM
0.
0.
67905.
10101 .
2490.
DISTRIBUT ION OF
MINIMUM
0.
1092757.
518337.
10125J.
90503 .
OF TOTAL CAPITAL
*5* *6
51.
8.
20.
1412.
10.
AVERAGE
0.
0 .
57905.
19282.
5832.
INVESTMENT REQUIREMENTS
AVERAGE
0.
10V2757.
708228.
23127R.
92095.
CCST FOR TREATMENT <$ 1000)
* *7* *8*
0. 0. 344.
0. 0. 27.
0. 0. 96.
0. 0. 6784.
0. 0. 69.
TOTAL
0.
0.
67905.
578457.
233287.
TOTAL
0.
1092757.
6374050.
13645399.
184190.
*9* *IC*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
S.D.
0.
0.
0.
10348.
2264.
S.D.
0.
0.
145095.
97111.
2251.
*11* *12*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
NUMBER
0.
0.
1.
30.
40.
NUMBER
0.
1.
9.
59.
2.
DISTRIBUTION OF ANNUAL 0£M TRE'TMENT COSTS (t 10001
MHX
MIN
AVF
TOT
SO
*|*
10.
0.
2.
119.
2.
*2*
2.
n ^
1.
4? .
0.
*3*
16.
0.
3.
178.
3.
*4*
6.
0.
1.
63.
1 .
*5*
26.
1.
5.
322.
5.
*6*
0.
0.
0.
0.
0.
*7*
0.
0.
0 •
0.
) *
*8*
9 .
I.
2.
157.
2.'
*9*
0 .
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*H*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
so
OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATICMftL TOTALS *
FLOW LESS THAN TR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CDNniT H1NS ( 1967 OOLLARSI
SIC CODE... ?816
TOTAL NUMBER OF MANUFACTURING PLANTS... 11
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TDTAl ANNUAL 0£M COST
TOTAL INNUM COST
CO
COST R &NGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
t000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
". TO 100000.
MAXIMUM
1450.
4S78.
1672038.
322373.
535222.
ne»i
1781677.
DISTR
MAXIMUM
0.
322873.
98768.
46543.
9224.
M I N I M UM
75.
7").
110785.
8299.
22369.
ANNUAL COST DF WASTE
REPLACEMENT
627608.
IBUTION OF OPERATION
MINIMUM
0.
100491 .
54640.
10323.
8299.
A VCR AGE
330.
749.
404909.
57473.
108897.
TREATMENT
INTEREST
96651 7.
AND MAINTENANCE COST
AVERAGE
0.
149331 .
68113.
29537.
8762.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
1.
2257250.
9H4263.
478175.
0.
MINIMUM
0.
2257250.
507886.
149560.
0 .
AVERAGE
0.
2257250.
71 1710.
319762.
0.
TOTAL
10216.
23212.
12552169.
1781677.
3375800.
TOTAL
3375801.
TOTAL
0.
746654.
544904.
472599.
17523.
TOTAL
0.
2257250.
9252227.
5435949.
0.
S.D.
319.
902.
292577.
58282.
95240.
s.o.
0.
97255.
15732.
11575.
654.
S.D.
0.
0.
163097.
I 13355.
0.
NUMBER
0.
5.
8.
16.
2.
NUMBER
0.
1.
13.
17.
0.
MAX
MIN
AVE
TOT
SO
*l*
*2*
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
93.
5.
21.
644 .
17.
1159.
9".
3?C .
9922.
20?.
420
8
64
1986
75
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
0.
0.
0.
0.
0 .
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TRE«TM£NT COSTS It 10001
*4* *5* *6* *7* *8*
0.
c.
0.
0.
0.
3.
1 .
I .
34.
1 .
277.
7.
49.
1518.
50.
43
1
7
230
8
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
c.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO DR S.O. REPRESENTS STANDARD DEVIATION. THE DATA OISTRIBUTICN USED IS HIGHLY SKEWED.
-------
STC COOF...
TOTAL NUMBER
281?
OF MANUFACTUP ING
* NAT IONAL TOTALS *
FLOW LESS THAN OR F3UAL TO fEOCAN CF WATER USE REGIONS
196ft FLOH CONDITIONS ( 1967 DOLLARS)
PLANTS...
167
MANUFACTURING
FlOW (MGY)
TOT4L
TOTAL
TOTAL
ANNUAl
ANNUAt
EM PLOY wt NT
COST
OtM COST
COST
M & X t M UM
10 BOO,
31138.
55021232.
3499223.
10486918.
MINIMUM
5C.
97.
198915.
I 1049.
36 3 I I.
AVFRAGF
592.
3156.
209R882.
159281.
42b«!40.
TOTAL
98848.
560412.
35Q513408.
26599856.
711 15200.
S.D.
1446.
9620.
5627175.
366778.
1079237.
OEM
P6599856.
ANNUAL COST OF WASTF TREATMENT
REPLACEMENT INTtRFST
175?.b664.
26989504.
TOTAL
71115024.
CPST RANGF
> 500000.
100000. TO
50000. m
toooo. ir
0. TO
500000.
100000.
50000.
I 0000.
COST RANGE
> 5000000.
1000000. TO 5000000.
5000Cn. Tn 1000000.
100000. TO 500000.
0. TO 100000.
*l*
*?*
DISTRIBUTION OF OPERATION
MI NT MUM
3*99223. 525777.
490154. IK740.
99113. 50137.
49574. 11049.
0. 0 .
ANO MAINTENANCE COST
1386208.
222918.
70095 .
28663.
0.
DISTRIBUTION OF I NVESTMFNT REQUIREMENTS
MAXIMUM
74?78624.
4975946.
984342.
486630.
0.
M IN P1 UM
5044923.
10J 3745.
517793 .
266536.
0.
AVCRAGt
157'2059.
2000344.
737555.
413984 .
0.
TOfM.
11089670.
10477127.
3084189.
1949108.
0.
TOTU
267105008.
164028288.
31714880.
10349590,
0.
DISTRIBUTION OF TOTAI CAPITAL CCST FCR TREATMENT {$ 1000)
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
H\jf.
TOT
SO
33690.
12.
614.
102500.
3321.
164? .
10.
109.
18238.
189.
4216.
61.
384.
'-4165.
SCO.
8192.
10.
317.
52865.
H86.
412
19
67
I 125?
5?
0.
0.
0.
0.
0.
0.
0.
0 .
a.
0.
6869.
86.
608 .
101495.
817 .
0.
0.
0.
0.
0.
*1Q*
0.
0.
0.
0.
0.
S.D.
1071386.
107963.
12930.
12139.
0.
S.O.
19821616.
999530.
137714.
59033.
0.
NUMBER
8.
47.
44.
6tt.
0.
NUMBER
17.
82.
43.
25.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (J 1000)
*7* * 8*
M \X
MIN
AVE
TOT
SO
444.
1 .
22.
3633.
47.
25.
1 .
2.
363.
3.
973.
2.
41 .
68 1C.
101 .
371.
1.
15.
2562.
3^.
1202
4
59
9831
128
0.
o.
o.
o.
o.
0.
0.
0.
0.
0.
484.
2.
20.
3402 .
49.
0.
0.
0.
0.
0.
*10*
0.
0.
o.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
sic CODE... 28i<*
TOTAL NUMtȣP OF MANUFACTURING PIANTS...
* N »I H'NftL TOT »LS *
HOW IF-SS TS'AN OR F'JI'Al TO ftiHAN CF WATf-R USt
1968 FlOrt CONDITIONS ( IS67 DOLLARS)
•EG IONS
?37
MANUFACTURING F.MPICYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL GEM COST
TUT4L 4NNUM COST
MAXIMUM
14000.
26C77.
4T44253.
I I 390H2.
1767C02.
MINIMUM
5C.
?6.
60178.
3900.
U825.
AVt-RAGI-
343.
61 9.
316257.
45348.
855]2.
TOT Al
81381.
146590.
74052944.
10747403.
20266320.
s.o.
1004.
1891.
416758.
94379.
147001.
HEM
IC747403.
ANNUAl COST OF WHSTfc TREATMENT
RFrPLACEMCNT INTERtST
3747646.
5771373.
TOTAL
20266416.
CO
COST RANGE
> 500000.
100000. Tf
•50000. TO
10000. TO
0. TO
DISTRIBUTION OF 1PF.RATIQN AND MAIN' E^ANCE COST
5000OC.
100000.
50000.
10000.
COST RANGE
> 5000010.
1000000. TO 50COOOO.
500000. TP 1000000.
100000. TO 500POC.
0. TO 100000.
MAX
HIM
AVF
TOT
SD
*1*
i XI MUM
1139082.
263381.
98149.
'+9344.
9739.
PAXU'UM
667 47 3 a.
4488472.
998783.
497389.
99427.
1 .
50886.
10148.
3900 .
WF.RAGK-
963518.
155798.
70203.
24395.
DISTRIBUTION OF INVESTMENT RF: QUI REMfcN TS
MINT W
6674738.
101 1935.
5 ?766.
113113.
4VF.R1GE
6674736 .
1572020.
676064.
263419.
91661.
DISTRIBUTION OF TOTAL CAPITAL CCST f-QR TRFAIMCNT ($ 10001
0.
0.
0.
0.
0.
273.
2.
16 .
377S .
23.
2841 .
55.
249.
^9089 .
259.
1830
1
51
12089
I4u
*6*
0.
0.
0.
0.
0.
c.
3.
0.
0.
0.
*8*
0.
0
0
0
0
TOTAL
1927036.
2025379.
3088914.
3439744.
266351.
TOT4I.
6674738.
1'292274.
31098928.
45571424.
549967.
0.
o.
0.
0.
0.
*10*
0.
0.
n.
0.
0.
S.O.
248284.
46360.
14413.
1 1380.
1715.
S.O.
0.
1002322.
1 34965.
I 13754.
7658.
NUMBER
2.
13.
44.
141.
37.
NUMBER
1.
11.
46.
173.
6.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
WIN
AVF
TOT
SD
*?*
DISTRIBUTION Of UNNUSL OEM TRE«TMtNT COSTS It 1000»
»
#4* *5* *6* *7* * 8* *9*
0.
0.
0.
0.
0.
7.
0 .
1.
220.
1 .
987.
3.
39.
9146.
81 .
150.
0.
f>.
1381.
12.
0.
0.
0 .
0.
0.
0
'-' •
0
0.
0.
0 .
.},
0.
1.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
o .
0.
*to*
0.
0.
0.
0.
0.
*u*
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
SO OR S.C. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USCD IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LESS THAN OR EQUAL M MEDIAN OF WATER USf RfGJONS
1968 HOW CONDITIONS ( 1967 OCLl ARS )
SIC CODE... 282
TOTAL NUMBtP OF MANUF-ACTUP I NG PLANTS... Z08
00
MANUFACTURING EMPLOYMENT
FLOW (XGY)
TOTAL CAPITAL COST
TUTU 4NNU4L 06M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
lOOOOn . TC
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 500000C.
1000000. TO 5000000.
500000. TO 1000000.
110000. TO 500000.
0. TO 100000.
MAX
AVF
TOT
SO
*l*
0.
0.
0.
0.
861 .
83.
17367.
92 .
MAX I MUM
3500.
11776.
10062441 .
555945.
1833873.
U6M
9897118.
DISTR
MAXIMUM
555945.
24fc412.
99106.
47115.
9853.
MINIMUM
125.
57.
263268.
6844.
40329.
ANNUAl COST Of hASTE
REPLACEMENT
12070178.
AVERAGE
872.
in.
1160594.
47582.
1 94975.
TREATMENT
INTEREST
I 8588064.
TOTAL
181469.
160341.
241403534.
9«97U8.
40r>54864.
TOTAL
4055536O
IBUTION OF OPERATICN AND MAINTENANCE CCST
^ I N I M UM
555945.
107380.
50076.
10021 .
6894.
AVERAGE
555W5.
1520B9.
>)8830.
22875.
8793.
TOTAL
555945.
3802213.
2271398.
3179641.
87934.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
12576051.
4956188.
987918.
4951C9.
0.
DISTRIBUTION
*3* *'»*
1313. 2576.
43. 12.
174. 147.
36163. 3C601.
147. 245.
MINIMUM
V'l- 5»>69775.
101 2700.
SO 6701 .
329085 .
0,
OF TOTAL CAPITAL COST
y
*5* ' *«*
3.. 2755,
0. 124.
0 . . 4 36 .
0. 90664.
0. 321.
AVERAGE
,
-------
* NATIONAL TOTALS *
FLOW LCSS THAN OR 63UAL TO MEDIAN OF WATfcR iJ
1468 FLOW CONDITIONS ( 1967 DCLI ARS I
SIC CODf... 283
TTTAL NUMBER OP MANUFACTURING PLANTS... 97
REGIONS
MANUFACTURING EMPLOYMENT
FLOW 8:>2I5424.
1389514.
5063054.
S.O.
15.78.
241.
254412.
16268.
48409.
ANNUAl COST (ft WASTE IREATMtNT
REPLACEMENT INTEREST
1389514.
1446271.
2227256.
TOTAL
5063041.
CO
CD
COST RANGF
~> 500000.
loooon. TO
50000. TO
10000. TU
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
^0000.
lonoo.
COST RANGF
> 5000000.
1000000. TP 5000000.
500000. TO 1000300.
100000. TO 510000.
0. Tl1 100000.
•'AX
TOT
SO
*2*
MAXIMUM
o.
0.
B4f) 12.
39R26.
9914.
MAXIMUM
0.
1594040.
8943C8.
4960 IB.
0.
0 .
60749.
10517.
2865.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
AVERAGE
0 ,
U .
73101.
19180,
M I NI M UM
0 .
1022296.
563122.
1 1430 .
0.
AVtSAfct
I ,
1354567.
742097.
248332.
0 .
TOTAL
0.
0.
365505.
690497.
3JJ522.
TOTAL
0.
8127406.
8163Q6&.
19866592.
0.
DISTRIBUTION OF TOTAL CAPITAL COST FDR TREATMENT ($ 1000)
*4*
* 5*
*10*
S.D.
0.
0.
9/3/..
891b.
IV 1 5 .
S.D.
0.
20498B.
106567.
10446C<.
0.
NUMBER
0.
u.
5.
36.
56.
NUMBER
0.
6.
il.
BO.
0.
*U*
*12*
0.
0.
r.
0.
0.
47.
2 .
9 .
921 .
10 .
0.
0.
0 .
r.
r.
225.
3.
37.
3070.
45.-
0.
n.
0.
0.
0.
407.
38.
1 16.
11236.
82.
0. 553.
0 . 36 .
0. 133.
0. 1291°,
0. 112.
35.
2.
n.
780.
7.
0.
0.
0.
0.
0.
0.
c.
0.
0.
0 .
0.
0.
0.
0.
0.
"AX
1VF
TTT
SO
0 .
r.
0.
0.
0.
*2*
c.
1,
58.
*3*
IBIJTT ON OF ANN JAL CLf TREATMENT CCSTS ($ 1000)
* *5* *6* * 7* *8*
*10*
«•!!*
*12*
0.
0.
0.
0.
c.
17.
0.
3.
243.
3.
A
:; .
9
T.
0.
34.
1 .
6.
534.
7.
0.
0.
0.
0.
0 .
18.
1 .
4.
366.
3 .
13.
0.
2 .
t 88.
3.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0 .
0.
OR S.D. REPRESENTS STANf'ARt) OtVtATION. THF DATA 01ST? I BUT ICN USFO \* HIGHLY SKEWEr,
-------
SIC CODE... 284
TOTAL NUMBER OF MANLIF AC TUF I \G PLANTS..
* NATIONU TOTALS *
FLCW LESS THAN D« FQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW Cni^DlTICIMS ( 1967 DCLl ARS )
105
MANUFUCTURING EMPLOYMENT
FL OW ( MGY )
T1TAL CAPITAL COST
TOTHL ^NNu^L OEM COST
TOTAL ANNUAL COST
MAX I MUM
4000.
443.
126510.
26439.
42506.
38.
5.
888 I.
820.
1947.
AVERAGE
514.
50.
28735.
4174.
7823.
TOTAL
53930.
5270.
301 ?144.
438282.
821463.
S.O.
540.
62.
19398.
3923.
6367.
ANNUAL COST OF HASTE
SM REPLACEMENT
438282. 15CE57.
TREATMENT
INTEREST
232320.
TOTAL
821459.
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
CO
O
COST RANGE
> 500000.
100000. TO
50000. TH
10000. TO
0. TO
500000.
100000.
500CO.
10000.
COST RANGE
> 5000000.
1000000. TO fOOOOOO.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVF
TOT
so
*l*
0.
0.
c.
0.
0.
0.
0 .
0.
0.
0 .
MAXIMUM
0.
0.
0.
26*39.
9789.
MAXIMUM
0.
0.
0.
I 58138.
978S3.
IN IM UM
0 .
0.
0.
10093.
820.
AVERAGE
0.
0 .
0.
I 5166.
3389.
DISTRIBUTION OF INVESTMENT REQJIREMENTS
MINIMUM
0.
0.
0.
11 7897.
I HOI .
AVERAGE
0.
a.
o.
138018.
33936.
TOTAL
0.
0.
0.
106160.
332122.
TOTAL
0.
0.
0.
276035.
3495403.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 10001
*$* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
22.
0.
3.
266.
3.
33.
4.
11 .
1139.
5.
0.
0.
0.
0.
0 .
0.
Q,
0.
0.
71.
4.
15.
1612 .
It .
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.O.
0.
0.
0.
5743.
2262.
S.D.
0.
0.
0.
28455.
19575.
NUMBER
0.
0.
0.
7.
98.
NUMBER
0.
0.
0.
2.
103.
0.
0 .
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
"IN
*vr
TOT
SO
0.
0.
0.
0.
0.
*2*
0.
0.
0.
0.
0.
0.
0.
D .
0.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000 I
*4* *5* *6* *7* *8* *9*
3.
0.
0.
1 .
0.
21.
3.
3.
313.
3.
0.
0.
0.
o.
c.
0.
0.
0.
0.
0 .
0.
0.
0.
p.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
so
OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NAfinNAL 10TALS *
FICW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1969 FLOW CONDITIONS < 1967 DOLI ARS)
SIC CODE... 285
TOTAL NUMBER OF MANUF4CTUPING PLANTS... 01
MANUFUCTURING EMPLOYMENT
FtOW (MGY)
T3TH CAPITAl COST
TPT4L 4NNUU OEM COST
TOTAL ANNUAL COST
MAXIMUM
28600.
4359.
1479333.
282736.
470611.
MINIMUM
150.
21.
47857.
?699.
8142.
AVERAGE
688.
137.
1170?5.
12602.
TOTAL
55692.
11071.
9479046.
1020760.
2?24580.
s.n.
3153.
483.
163157.
31418.
52074.
OSM
ANNUAL COST np WASTE TREATMENT
REPLACEMENT INTEREST
1020760.
473?52.
729886.
TOTAL
2224598.
Oi
CO
COST RANGE
> 500000.
100000. TO
50000. TO
I0000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000DOO.
100000. TO 500000.
0. TO 100000.
AW
TOT
SO
*1*
0.
0.
0.
0.
0.
*2*
82.
2 ,
5 .
421 .
9 ,
DISTRIBUTION OF OPERATION
MAXIMUM MINIMUM
o. '>.
282736. 282736.
57576. 57576.
42387. 11053.
9728. 2699.
AND MAINTENANCE CC1ST
AVERAGE
0.
232736.
•J7576.
I 6599.
6257.
MAXIMUM
0.
184916f>.
520809.
411694.
97482.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1B49166.
520809.
101020 .
53572.
AVERAGE
0.
1849166 .
5^0809.
151106.
90862.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREAIMtNT ($ IOOC)
*3*
1038.
39.
IOC .
115.
*/,*
359.
2.
12.
S67.
40.
0.
0.
0.
0.
0.
* 6*
0.
0.
c.
0.
0.
! *
0.
0.
TOTAL
0.
282736.
57576.
298778.
381671.
TOTAL
0.
1849166.
520809.
6648660.
2330183.
0.
0 .
0.
0 .
0 .
s.o.
0.
0.
0.
7540.
2091 .
S.D.
0.
0.
0.
55368.
11951.
NUMBER
0.
1.
1.
18.
61.
NUMBER
0.
1.
I.
44.
35.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*U*
0.
0 .
0.
0.
0 .
*12*
0.
0.
0.
0.
0.
MAX
MIN
\VF
TOT
SO
0.
0.
0.
0.
0.
3.
0.
I .
44 .
0.
*3*
243.
2.
11 .
851 .
DISTRIBUTION OF ANNUAL 0£P TREATMENT COSTS <$ 1000)
*«.* #5* *6^
37.
0.
2.
126.
4.
0.
0 .
0.
0.
0.
6.
•
o.
0 .
0.
0.
0.
0.
0.
0,
0 ,
0,
0 .
0,
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0 .
U .
0.
*12*
0.
0.
0.
0.
0.
so rm s.o. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED is HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LESS THAN OP, EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLO'.i CONDITIONS ( 1967 DCLLARS)
SIC CODE... 286
TOTAL NUMBER OF MANUFACTURING PLANTS... 23
MANUFACTURING EMPLOYMENT
FL OW (MGY )
TOTAL CAPITAL COST
TOTH 4NNIJ4L OGM COST
TOTAL ANNUAL COST
MAXIMUM
2000.
1 115.
682948.
132494.
MINIMUM
100.
27.
8062 1.
3878.
14066.
AVERAGE
376.
276.
263546.
1731S.
•50789.
TOTAL
R654.
i<>352.
6061566.
4983?7.
U6H14.6.
S.D.
488.
258.
1599/6.
11971.
32190.
ANNUAL COST OF V.ASTE
OSM REPLACEMENT
358327. 303C78.
TREATMENT
INTtRESI
466740.
TOTAL
1 1681'. 5.
DISTRIBUTION Of OPERATION AND fAINTENANCt CCST
CO
CO
COST RANGE
> 500000.
100000. TO
50000. TO
1000-1. TO
0. TO
500000.
I 00000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 1000CO.
MAXIMUM
0.
0.
0.
45759.
9770.
MAXIMUM
0.
0.
853685.
4938 10 .
0.
MINIMUM
0.
0.
0.
11184.
3828.
AVERAGE
0 .
0 .
0.
24790 .
7606.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
0 .
533947.
10^776.
0 .
AVERAGt
0.
c .
642783.
242391.
0 .
TOTAL
0.
0.
0.
322271.
76057.
TOTAL
0.
0.
3213917.
4363045.
MAX
MIN
AVF
TOT
SO
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMtNT <$ 1000)
*
0.
0.
0.
0.
0 .
*2*
46.
/, .
16.
365.
11 .
*3*
2C3.
28.
83 .
1907.
47.
*4*
77.
2.
20.
462.
18.
*5*
46.
11.
23.
53?.
10.
0.
0.
0.
0.
0.
*7*
0.
I'.
0.
f).
*8*
312.
36 .
122.
i")6 .
74.
*9*
0.
0.
0.
0.
0.
S.D.
0.
0.
0.
10980.
2022 .
S.D.
0.
0.
127953 .
104862.
0.
NUMBER
0.
0.
0.
13.
10.
NUMBER
0 .
0.
5.
18.
0.
*10*
0.
0.
0.
0.
0.
*u*
0.
0 .
0.
0.
0 .
0.
0.
0.
<>.
0.
WIN
\\if-
TOT
sn
*1*
0.
0.
0 .
o.
0.
*3*
DISTRIBUTION OF ANNUAL O&M TREATMENT COSTS ($ 1000)
*6* *7* l:''i* . *9*
1 .
0.
I .
If- .
o.
12.
I .
4.
90 .
3.
5.
0.
? m
36.
1.
21.
1 .
B.
175.
•>.
n.
o.
0.
V •
o.
0.
0 .
('.
o-.
u.
7.
1 .
3 .
72.
2 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*11*
0.
0.
0.
*I2'
0.
0.
0.
0.
0.
SO OR S.O. Pf PRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKFWEO.
-------
* NATIONAL TOTALS *
FLCW I CSS THAN UR EQUAL TG MEDIAN OF WATER U St REGIONS
196B I-LIIW CDNDII IONS ( l'»67 OCLUP.S )
SIC COOt-... 287
TOTAt NUMBER OF MANUFACTURING PI ANTS... 106
MAXIMUM MINIMUM AVERAGb
MANUFACTURING EMPLOYMENT 3900. 70. 248.
FLOW (MGY) 15216. 16S. 1019.
TOTAL CAPITAL COST 1749S54. 9949). 243599.
TOT*L 4NNIHL 0£M COST 596C23. 12448. 4664,1.
TOTAL ANNUAI COST >U8217. 25o«j. ' 7758t.
ANNUAL COST OF kASTE iREATMtNT
'3£,M KtPLACfcMBlT INTEREST
4944174. 129LC75. 1988256.
DISTRIBUTION OF OPtKAT'CN AND PAlNTENANCt COST
OJ
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TU
500000. TO
100000. TO
0. TO
500000.
I 000 00.
^0000.
10000 .
50COOOO.
1000300 .
50000C.
100000.
MAXI^UP
596023.
277103.
98445 .
47301.
0.
MAXIMUM
0.
2136942.
f.t 5367.
4900 12.
0.
MINIM I.M
596023 .
11 0378.
50024.
1 244«.
, 1
-• *
0 ISTRIBUT ION OH
M I N I -4 UM
0 .
1045030.
53? 776.
124366 .
C .
A VEKAGC
596023.
1 71341! .
64424.
26100 .
Z
INVESTMENT KF.QU (K fc". EN TS
AVf.WAGt
'^ •
15JU314 .
5H5J04 .
24989 J.
>J f
TOTAL
26328.
I 0799 2.
25H21520.
4944174.
8223534.
TOTAL
8223505.
TOTAL
596323.
856741 .
1481 '55.
.•'0'J9670.
0.
T OT Al.
0.
4524944.
151 1,-(21.
2424020K.
(1.
S.D.
425.
1769.
199576.
65488.
90580 .
S .D.
0.
71702.
14502.
8722.
0 .
s.o.
0.
60C641.
50931 .
84d04.
U.
NUM BtR
1 .
5.
23.
77.
0.
NUMBER
0.
3.
6.
9C.
0.
MAX.
MI N
4 VF
TOT
so
0.
0 .
0.
0.
0 .
0.
o .
0 .
0.
0 .
DISTRIBUTION OF TOTAL CAPITAL COST FOR THEAT KENT li 1000)
*•}* */,* * 5« * t* *7* *8v *9*
P7C. 654. 144. C. til. 0. 0.
5i'. 7. 17. 0. 25. 0. 0.
131 . 41 . 34. 0 . >6. 0. 0.
}9??. 43^8. 36<-b. O. 3847. 0. 0.
103. 74. 17. 0. 8. 0. O.
*:o*
0.
0.
0.
O.
0.
0.
(t.
0.
0.
0.
VI.
0.
*i*
* 3*
DISTRIBUTION OF ANN'JAL Oil* TREATMEM CCS IS is 10001
v,i.' *S* *6* *!•- "0* *9*
* 10*
*!!'
:/*
"AX
j IN
wr
TOT
•in
G .
0.
c.
0.
0.
0 .
p .
(> .
D .
C.
1 °9 .
3.
14.
149'V.
22.
70.
1 .
5.
508 .
U.
313.
' *
26.
2712.
35.
0.
0 .
0.
u.
0 .
15.
1 .
2 .
225.
2.
U.
0.
0 .
i).
v> .
0 .
0.
0 .
rt
*• V
(-\
• • •
P.
0.
0 .
I1.
0.
(1 .
0.
'->.
0 .
0.
0.
0.
u.
ij .
:J.
OR S.O. REPRESENTS STANDAfJO DFVIATIUH. THl- DAT \ DISTKIOUTION UStO IS HIGHLY SKEWFO.
-------
SIC CODE... 289
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FLCW LESS T"AN bP- EQUAL if) MEDIAN UF WATfcK USE REGIONS
196Q FLUU CONDITIONS ( 1967 UUL! 4RS I
MANUFACTURING EMPLOYMENT
FL OW ( MGY )
TOTAL CAPITAL COST
TI.IT4L 4NNUAL OEM COST
TOTAL ANNUAl COST
MAXIMUM
20000.
23 798.
5973824.
1230992.
19R9667.
MINIMUM
4C.
78678.
591 9.
15911.
AVCKAGt
769.
865.
411839.
55415.
1077 19.
TOTAL
1 13861.
I28O50.
60952208.
9204405.
15945426.
S.O.
2079.
2661 .
706154.
138543.
227756.
ANNUAl COST OF VvASTE
U£M REPLACEMENT
8204405. 3047flC.
TREATMENT
INTEREST
4693317.
TOTAL
15945332.
DISTRIBUTION OF OPERMICK AND MAINTENANCE COST
04
CO
k£S
^^^
COST RANGE
> 500000.
100000. Tn
50000. TO
10000. TO
0 . TO
COST RANGE
> 5000000.
1000000. TU
SOOOOO. TO
100000. TO
0. TO
500000
100300
50000
10000
5000000
10"0000
500000
100000
MAXIMUM
1230992.
45C966.
96685.
49662.
M INIMUM
646666.
118726.
50187.
10164.
S919.
AVERAGE
88866?.
2 7528.
63794.
22640.
B408 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
7467280.
4136S8?.
986104.
MAX
MTN
AVF
TOT
so
9834/.
MINIMUM
5055837.
1079896.
502534.
120774.
98347 .
AVERAGE
6261558.
1940333
59517C.
2480V7.
•1 8 »47
494.
20.
2936.
50.
UISTR1BUTIUN OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
TOTAL
2665985.
2282B1I.
829325.
2241335.
184977.
TOTAL
125^3117.
23284000.
124--I8577.
2/786H96.
98347.
S .0.
3('4811.
113937.
15223.
10016.
1089 .
S.D.
170514/.
1037310.
122664.
«3742.
0.
*2*
309.
2816.
37 .
2337.
43.
203.
3003C.'.
291 .
1526.
3.
55.
8127.
169.
*5*
103.
6.
L6.
2368.
14.
C .
0.
:>.
o.
c.
*7*
0.
0.
•
0.
0.
*8*
1204.
19.
99.
14676.
1 50.
*9*
0.
0.
0.
0.
0.
MO*
0.
0.
0.
0.
0.
*ll*
o.
{ 1 4
0.
0.
0 .
NUM 6ER
3.
11.
13.
99.
NUMBER
2.
12.
21.
112.
1.
*12*
0.
0.
0.
0.
0.
•'AX
4VE
TOT
SO
81.
0.
591.
9.
#2*
8 .
1 .
147 .
1 .
*3*
767.
3.
32.
4789 .
86.
DISTP.IBUTI ON 01- ANNUAL U£l* TREATMENT CCSFS (J 1000 I
*/,* *S* *6* */'! *J* *<9*
C.
6.
885.
16.
161.
1.
8.
U73.
1H.
G.
U .
0 .
0 .
0.
0-
0 .
0.
1.
4 .
620.
8 .
0.
0.
0 .
0.
0.
0.
0.
0.
0.
*11*
0.
0*.
0 .
0.
*12*
0.
0.
0.
0.
0.
SO OR
S.O. REPRESENTS STANPARU DEVIATION. THE OAT A DISTRIBUTION USfcU IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LFSS THlkN OR EQUM. TO i»EDHN Of- W »T ER USE REGIONS
1<56R FLOW CONDITIONS ( 1967 DOLLARS)
sic CODE.. . 29
TOT4L NUMBER OF MANUFACTURING PIUNTS... H4
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOT4L C4PIT&L COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAl COST
M^XIMUM
10000.
25451.
^7004336.
1909998.
10419546.
MINIMUM
27.
4.
26943.
1 645.
5067.
4VER4GE
381.
938.
2447213.
I 13944.
424752.
TOTHL
127318.
313161.
817,369344.
38057440.
141867296.
S.D.
876.
2611.
6578128.
226014.
1055533.
OKM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
38057440.
40868464.
6293740E.
TOTAL
141863312.
COST RANGE
> 500000.
100000. TO
50000. TO
I0000. TO
0. TC
500000.
100000.
50000.
I 0000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 10COOOO.
100000. TO "500000.
0. TO 100000.
*l*
DISTRIBUTION OF OPERATION'
MAXIMUM MINIMUM
1909998. 538860.
444436. 101038.
97150. 50142.
49756. 10113.
9577. 1645.
AND MAINTENANCE CCST
AVERAGE
999636.
195117.
69541 .
28326.
5220.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
B3755408.
4930840.
991593.
478823.
98949.
MINIMUM
5063841.
1013979.
508609.
100476.
33679.
AVERAGE
16967392.
2246010.
751910.
211395.
69457,
DISTRIBUTION OF TDTHL CAPITAL CCST FCR TREATMENT (* 100
**.* *6* *7* *8*
MAX
MIN
WE
TOT
SD
37601 .
5.
623.
208043 .
3210.
419.
0.
?e.
9241 .
51 .
2325.
10.
211.
70491 .
300.
1047.
0.
41.
13660.
112.
31
0
10
985
5
0.
0.
0.
0.
0.
0.
0.
0.
' *
0.
1 87.
0.
37.
3804.
29.
TOTU
14994542.
15609352.
3963824.
3115819.
375852.
TOTAL
678696192.
287491840.
38347424.
13740697.
3472851.
* 9*
0 .
0.
0.
0.
0.
*10*
n.
0.
0.
0.
0.
S.D.
407515.
86781.
13536.
12570.
2117.
s.o.
18475008.
1028432.
139783.
103767.
18665.
*ll*
0.
0.
0.
0.
0.
NUMBER
15.
80.
57.
110.
72.
NUMBER
40.
128.
51.
65.
50.
*12*
26321.
150.
2213.
511156.
3563.
*t*
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS ($ 10001
*5* *6* *7* *8* *9*
MAX
M[N
AVE
TOT
so
482.
0.
28.
9245.
57.
7.
0.
1 .
337.
1 .
477.
0.
24.
8023.
54.
62.
0.
3.
1027.
7.
17
•)
2
253
3
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
7,
0.
2.
160 ,
1 .
0.
0.
0.
0.
0.
#10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
881.
6.
82.
19013.
122.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOTAL NUMBER
291
OF MANUFACTURING
* NATIONAL TOTALS *
FLOW LESS THAN UP. EQUAL TO MEDIAN OF rfATtk U .>E REGIONS
1969 FLOW CONOtTlUNS ( 1967 DCLl *RS )
PIANTS... 231
MANUFACTURING EMPLOYMi-NT
Fl OW ( MGY I
TOTAL CAPITAL COST
TUTM. ANNUAL 06M COST
TOTAL ANNUAl COST
MAXIMUM
10000.
25451.
67004336.
1409996.
10419546.
MINIMUM
35.
32.
2082^6.
10333.
36984.
AVERAGE
470.
1320.
34 92 54 5.
160663.
TOTAL
108587.
306146.
306?78112.
37113136.
139576224.
S .U.
1028.
3062.
7686978.
258488.
1228045.
ANNUAL COST OF- WASTE
REPLACEMENT
37113136.; 4T338896.
TREATMCNT
iNTfcRt ST
t>2121d?2.
TOTAL
139573904.
CO
33
9>
COST RANGE
> 500000.
LOOOOO. Til
?0000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000.
100000.
50000.
10000.
if-
,-i
5000000.
1000000.
500000.
IPOrOO.
MIN
TDT
SO
*1*
37601.
14,
896.
207051.
3831 .
*2*
419.
, I
38.
8893.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
1909998. 538H60. 9V96J6.
444436. 101038. 195117.
97150. 50142. 69917.
4S756. 1033?.. 32401.
0. 0. 0 .
OISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGf
83755408. 5063841. 16967392.
4930840. 10139/9. 2246030.
991593. 508609. 758677.
478823. 260283. 366490.
0 . (J . 0 .
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT (S 1000)
*3*
2325.
4(' .
2fi7 .
66230.
334 .
*5*
*£*
*7*
* 8*
TOTAL
14944542.
15609352.
3845436.
266495?.
0.
TOTAL
678696192.
28/491840.
37175168.
51JOS60.
1047.
2.
58.
13450.
131.
S .U.
407515.
867fll.
1362^.
11050.
S .U.
18475008.
1028432.
138253 .
64113.
U.
*lt*
NUMBtR
15.
80.
5t>.
61.
d.
NUMBER
40.
128.
49.
14.
U.
*I2*
3.
0.
0.
0.
0.
f; .
0.
0.
11.
0.
0.
0.
• 1.
0 .
0.
0 .
0 .
0.
f! .
0.
0.
0.
0.
0.
0.
0.
0.
U.
<).
0.
0.
0.
0.
0.
0 .
26321.
150.
2213.
511150.
3563.
*3*
DISTRIBUTION OF ANNUAL 0£M TREATMENT CCSTS <* 1000)
*5* *6* *7* "8*
••fAX
MIN
4VE
TOT
SO
48? ;
2.
39 .
9064.
65.
7 .
V •
1 .
291 .
1.
477.
2.
34.
775? .
62.
62.
0.
4.
994.
H.
0.
0.
0.
0.
0.
..
0
f 1
0
0
0.
0 .
0 .
0.
0.
0 ,
0 ,
0,
0 .
1*
0.
o.
0 .
Q.
0.
*10*
0.
U.
0.
0.
0.
*11«
0.
i'«
U .
0.
0.
*12
sai
6
82
19013
122
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTP. 1 BUT ION USED !S HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LESS THAN OP EQUAL TO PtDUN OF WATER USE REGIONS
1968 F13W CONDITIONS ( 1967 DOLLARS)
SIC CODE... 30
TOTAL NUMBER OF MANUFACTURING PLANTS... 459
MANUFACTURING EMPLOY I»CNT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
20000.
4031.
2142840.
244611.
516751.
MINIMUM
45.
3.
21613.
915.
3660.
663.
105.
180667.
(0886.
33831.
TOTAL
304302.
48037.
82926224.
4996516.
15528579.
S.D.
1295.
244.
160553.
16064.
36255.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
4996516.
4146310.
63853L6.
TOTAL
15528142.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CO
CO
•a
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
n. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000.
1000 00.
•50000.
I 0000.
5000000.
1000000.
500000.
100000.
MAX
MINI
WF-
TOT
SO
*l*
0 .
n.
n.
o.
o.
*?*
162 ,
I .
9.
4194 ,
11 .
MAXIMUM
0.
244611.
74894.
45179.
9930.
MAXIMUM
0.
3*78550.
994919.
486637.
99938.
MINIMUM
0.
126883.
54477.
10041.
915.
WERAGE
0 .
167660.
65099.
17443.
6140.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1030465.
51 1706.
100289.
27016.
AVERAGE
0.
1738926.
666549.
206742.
79656.
TOT4L
0.
502980.
260395.
2250193.
1983061.
TOTAL
6955707.
12664428.
80215856.
3823471.
DISTRIBUTION OF TOTAL CAPITAL CCST FDR TREATMENT It 1000)
*5* *6* *7* *8* *9*
3 18.
4 .
30.
13567.
25.
292.
0 .
8.
3584.
18.
0.
0.
0.
' 9
D.
775.
12.
86.
63.
0.
0.
0.
0.
0.
596.
5.
48 .
22084.
45.
0.
0.
0.
0.
0.
n.
o.
o.
o.
0.
S.D.
0.
66681 .
9256.
8512.
2126.
S.D.
0.
686185.
156202.
8149C.
16886.
0 .
0.
0.
0.
0.
NUMBER
0.
3.
4.
129.
323.
NUMBER
o.
4.
19.
308.
48.
*12*
0.
0.
0.
0.
0.
"tax
MfM
A VE
TnT
SD
*l*
0.
0.
0.
0.
0.
*2*
5.
0.
1 .
327.
0 .
47.
0.
2.
768.
3.
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
33.
0.
t .
503.
2.
D.
0.
0.
0.
0,
130.
0.
5.
2482 .
9.
0.
0.
0.
0.
0.
29.
0.
2.
917.
2.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*u*
0.
0.
0.
0.
*12*
0.
0.
0.
n.
0.
SO OR S.D. REPRESENTS STAfJDARD DEVIATION. THE DAT4 DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIUNAL TOTALS *
FLOW LESS THAN OR EQUAL TO VEDIAN OF WATER USE REGIONS
1968 FL3W CONDITIONS ( 1967 DOLLARS)
SIC CODE... 31
TOT4L NUMBER OF MUNUF^TUR ING PLANTS... 215
MANUFACTURING EMPIOYMFNT
FLOW 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000.
100000.
50DOO.
I 0000.
5000000.
1000000.
500000.
I 00000.
M/VX
MIN
5VE
TOT
SO
*l*
MHX1MUM
0.
214222.
94026.
46835.
9739.
MAXIMUM
0.
3191490.
"65007.
494153.
61739.
MINIMUM
0.
114131,
50403.
10076.
1061.
&VER4GE
0.
150792.
67584.
Z2632.
2617.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1012275.
517147.
109181.
15206.
AVtRAGE
0.
1525676.
693436.
314806.
29569.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT (* 1000)
TOT4L
0.
603166.
1013757.
2444260.
230268.
TOT4L
0.
54924336.
36058672.
14795888.
2365488.
*3*
*4*
*5*
0.
0.
0.
0.
0.
279.
22.
74.
8192.
50.
1057.
127.
344.
37789.
185.
609.
21.
114.
12576.
108.
99
0
14
1433
14
*6*
0.
0.
P.
0.
o.
*7*
0.
0.
0.
0.
0.
*8+
720.
8.
123.
26524.
121 .
#9*
0.
0.
0 .
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
C.
0.
0.
0.
S.D.
0.
43870.
12944.
9693.
2152.
S.D.
0.
580238.
126243.
11S670.
9246.
NUMBER
0.
4.
15.
1 08.
88.
NUMBER
C.
36.
52.
47.
80.
*12*
0.
0.
0.
0.
0.
MAX
WIN
AVF
TOT
SO
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (* 10001
*6* *7* *8* *9*
0.
0.
0.
0.
0 .
4.
1 .
t .
160.
1 .
101.
5.
21 .
2259.
18.
24.
1.
5.
534.
4.
175.
0.
7.
721.
19.
0.
0.
!">.
0.
0.
0.
0.
0.
0.
0.
39 .
I .
3.
618.
3.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*lt*
0.
C.
0.
C.
0 .
*12*
0.
0.
0.
0.
0.
so
OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE.. .
TtlHL NUMflfR
311
OF MftNUF&CTURING
* MAT tUNAL TOTALS *
FLOW ICSS TH4N OR EQUAL 10 VtDIAN OF WAI tK U!
1966 FL3.J CONDI HUNS ( 1S67 DOLLARS)
t RFG1UNS
PLANTS...
11 0
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOT 4L C^P IT4L COST
TOTAL ANNUAL CSM COST
THTAL ANNUAL COST
Ml XI MUM
1500.
25?5 U92.
14231 1 .
456/5H.
MINIMUM
60.
55.
238052.
8143.
3d793.
189.
72 VfbO.
J042 9.
122350.
TOTAL
20762
79M5760 .
3347194.
13458456.
S.D.
181.
283.
448952.
2494f>.
81 740.
ANNUAL COST (IF WASTE
06M REPLACEMENT
3347104. 3980/07.
TREATMCNT
IN1CREST
6130410.
TOTAL
134583-31.
CO
CO
COST RANGf
> 500000.
100000. TO
50000. Til
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000.
100000.
50000.
10000.
5000000.
1000000.
500000.
IOOOOC.
MAXIMUM
0.
142311.
46835.
9739.
PAX I MUM
0.
31914SO.
96500Y.
477357.
0 .
MINIMUM
0.
11413L.
50403.
1010?.
8143 .
\VtR4GE
6H613
22864.
9040.
DISTRIBUTION OF INVESTMENT KEOU1CEMENTS
M IN I.MUM
0.
1012275.
517147 .
2^)7564.
.C.
AVERAGE
w •
1540049.
69 3 V 36 .
411.638.
'J.
TOT4L
0.
3H8944.
891968.
2012053.
'i4?39.
TOTU
0.
53901728,
l/i 05 06 72.
955966r>
0 .
s.o.
0.
14305.
13036.
10233.
676.
S.D.
0.
582170.
126243.
43183.
C .
NUMBER
0.
3.
13.
Hfc.
f. .
NUMaER
0.
i*>.
52.
23.
0.
DISTR IF!UTIUN OF TOTAL CAPITAL CCST FOR 'REATtftNT ($ 1000)
MAX
M1N
HVF
TOT
SO
*l*
0 .
0.
0.
0.
0.
279 .
2?.
74.
8102.
50.
*3*
1057.
127.
344.
37789.
185.
609.
21.
114.
12576.
108.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
*7*
0.
0.
'->.
0.
0 ,
608.
68.
191 .
21059.
1 07 .
*g*
0.
0.
0 .
n.
0 .
*10*
0.
0.
0.
0.
0.
*11*
0 .
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
0.
0.
0.
0.
0.
4.
1 .
1 .
160.
1 .
*3*
IC1 .
5.
21.
2259.
18 .
DISTRIBUTION OF ANNUAL OCM TREATMENT COSTS ($ 1000)
*5* *6* *7* "a* *9*
1.
5.
534.
4.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0,
0.
13.
1 .
4.
394 .
2.
0.
o.
•).
0 .
0.
*10*
0.
o.
0.
0.
0.
*ll*
0.
0 .
0.
0.
0.
0.
0.
0.
SD OP S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LESS THAN OR EQUAL TO PEOIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOT»L NUMBER OF M4NUF4CTURING PLANTS... 945
MANUFACTURING EMPLOYMENT
FLOW «MGY)
TOT&L C&PIT&L COST
TOTAL ANNUAL C£M COST
TOTAL ANNUAL COST
8000.
5890.
2161563.
486195.
760714.
MINIMUM
50.
5.
20021.
888.
3456.
345.
201.
165661.
18310.
39347.
TOTAL
325708.
190163.
156549696.
17303312.
37183072.
S.D.
586.
463.
200408.
34082.
59219.
OEM
17303312.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
7827484.
12054320.
TOTAL
37185104.
Ctf
to
0
COST RANGE
> 500000.
100000. TO
50000. TO
1 0000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000
100000
50000
1 00 00,
5000000
1000000,
500000
100300.
MAX
MIN
5VE
TOT
so
*1*
0.
0.
0.
0.
0.
*2*
DISTRIBUTION OF OPERATION
H&XIMUM MINIMUM
0. 0.
486195. 102218.
99501. 51634.
49855. 10045.
9944. 888.
AND MAINTENANCE COST
4VER4GE
0.
179255.
70858 .
19705.
4889.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE
0. 0. 0.
2701953. 1004533. 1503717.
984544. 505899. 707054.
497099. 100554. 200278.
99243. 25026. 61618.
TOT 41.
0.
4839883.
1771442.
8414072.
2278181.
TOTM.
0.
31578064.
22625728.
124973664.
16513613.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT (* 1000»
*6* *7* *8* *9*
0 .
0.
0.
0.
0.
1320.
17.
126.
118835.
131.
841.
I.
29.
27149.
66.
0.
0.
0.
0.
0.
2S6.
13.
57.
10566.
48.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
0.
87872.
14038.
9036.
2596.
S.D.
0.
477855.
158329.
87428.
22177.
NUMBER
0.
2T.
25.
427.
466.
NUMBER
0.
21.
32.
624.
268.
*ll*
0.
0.
0.
o.
0.
*12*
0.
0.
0.
0.
0.
MAX
WIN
AVE
TOT
SO
0.
0.
0.
0.
0.
*2*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (* 10001
*4* *5* *6* *7* *8*
0.
0.
0.
0.
0.
391.
1.
14.
13534.
27.
95.
0.
3.
3193.
7.
0.
0.
0.
0.
31 .
0.
3.
576.
5.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
no*
o.
0.
0.
0.
0.
*lt*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE...
THTUt NUMBER
* NAT tONAt TOTALS *
FLCW LESS TH!*N OR f-QUAL TO ^tD IAN Of- WATER USE REGIONS
1968 Ft 1H CONDITIONS t IS67 DQLl ARSt
OF M&NUFHCTURING PI ANTS...
23
MANUFACTURING EMPLOYMENT
FLOW (MGYt
TOT4L CHPIT4L COST
TOTAL ANNUAL Of* COST
TOTAL ANNUAL COST
MAXIMUM
3000.
1419.
1042689.
156321.
288743.
MINIMU"
250.
12?.
203102.
16177.
4198 1.
!WER\GE
93 t.
466.
^5182 <>.
52775.
110157.
TOTAL
21408.
10724.
10392060.
12 13822.
2533610.
S.O.
705.
340.
213239.
33474.
60461.
ANNUAL COST C)F WASTE
OEM REPL\CEMENT
1213822. 5196';3.
TREATMENT
INTtREST
800188.
TOTAL
2533612.
CO
CD
H-»
COST RANGC
> 500000.
100000. TO
50000. TO
1 0000. TO
0. TO
COST RANGE
> 5000000.
1 000000. TO
5000CO. TO
100000. TO
0. TO
500000
100000
50000
toooo
5000000
1000000
500000
100000
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MINIMUM 4VERHGE
0.
156321.
95850.
49265.
0.
0.
156321.
52885.
16177.
0 .
0.
156321.
76810.
3164'..
0.
0.
1303361.
962863.
4693S4.
0 .
DISTRIBUTION Of INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0 . 0 .
1303361. 1303361.
505899. 707905.
253977. 354524.
0 . 0 .
M!N
4V F
TOT
SO
*l*
0.
0.
0.
0.
0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT (t 1000)
TOT4L
0.
156321.
614484.
443020.
0.
TOTAL
0.
1303361.
7786950.
3899766 .
0.
*?*
0,
0 ,
r .
540.
I 13.
243.
5590.
1C9.
207.
17.
65.
1500.
4T.
#5*
0.
0.
0.
0.
0.
*6*
2<56.
72.
143.
3243.
58 .
*7*
0.
0.
0.
0.
0.
*8*
0.
0.
0 .
0.
0,
* g*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
s.o.
c.
0.
13409.
t 1759.
0.
S.D.
0.
0 .
158286.
74431.
0.
NUMBER
0.
1 .
H.
14.
0.
NUMBER
3.
I.
11.
11.
t).
*il*
0 .
0.
0.
0 .
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
4 V"
TOT
SO
0.
0.
0.
0.
0 .
t
n.
o ,
0.
0.
0 .
*3*
101 .
If .
34 .
776.
2i ,
*4*
24.
2.
8.
185.
5.
DISTRIBUTION OF ANNUAL 0KM TREATMENT COSTS (t 1000)
*5* * 6* *7* *8* *9*
0.
0,
0.
0.
31 .
4.
n.
254.
7.
0.
0.
0.
0.
0.
0 .
0 .
0.
0 .
0.
0.
0 .
0.
0.
«10*
0.
0.
0.
0.
0.
*11*
0.
0 .
0.
0.
u .
0.
0.
0.
0.
0.
OP S.D. REPRESENTS STANDARD DEVIATION. THE DATA D! STRI RUT!CN USED IS HIGHLY SKEWED.
-------
* NAT IONAL TOTALS *
FLOW LESS TH4N OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FL3W CONDITIONS < 1567 DOLLARS)
SIC CODE... 322
TOTAL NUMBER OF MHNUF!\CTUR ING PLANTS... 125
MANUFACTURING EMPLOYMFNT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL f!GM COST
TOTAL ANNUAI COST
MIVXIMUM
8000.
1449.
974138.
144238.
267953 .
MINIMUM
170.
5.
30675.
888.
4784.
4VFRHGE
766.
67.
121101.
8835.
24215.
TOTAL
95739.
8316.
15137577.
11 04397.
3026848.
S.D.
969.
143.
109486.
14523.
28210.
O&M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
U04397.
756879.
1165592.
TOTAL
3026867.
00
CO
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
&VE
TOT
sn
*t*
0.
0.
0.
0.
0.
*2*
0 .
0.
0.
0.
DISTRIBUTION OF OPERAI10N
MAXIMUM MINIMUM
0. 0.
144238. 144?38.
0. 0.
49083. 10143.
9520. 888.
AND MAINTENANCE COST
4VER4GE
0 .
144238.
0 .
18892.
4492.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
1217673.
645060.
468175.
99243.
MINIMUM
0 .
1217673.
645060.
10104.".
3634^.
AVERAGE
0.
1217673.
645060.
177049.
76670.
TOT4L
0.
144238.
0.
52 8 963 .
431199.
TOTAL
0.
1217673.
645060.
13455749.
3603498.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
#3* *4* *5* *6* *7* *8*
504.
17.
68.
8438 .
58.
194.
1.
10.
1201.
20.
0.
0.
'.
0.
0.
276.
13.
44.
5498.
33.
0.
0.
0.
0.
0 .
0.
0.
0 .
0.
0 .
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
s.o.
0.
0 .
u.
10213.
1944.
S.O.
0.
0.
0.
90742.
16040 .
NUMBER
0.
1.
0.
28.
96.
NUMBER
0.
1.
1.
7o.
47.
(I.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
SO OR
*1*
o.
0.
0.
0.
0.
*2*
0.
0 .
0.
0.
0 .
*3*
93.
1 .
6.
6 "56.
9.
DISTRIBUTION OF ANNUAL O&M TREATMENT COSTS ($ 10001
*5* *6* *7* *8* *9*
22.
0.
1 .
160.
2.
0.
0.
n.
0.
o.
29.
0.
2 <
248.
3.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0 .
0.
S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
0.
0.
0.
0.
0.
*U'
0.
0.
0.
J.
0.
0.
0.
0.
0.
0.
-------
sic CODE...
TIT&l NUM6CP
* NAT IUNAL TOTAI S *
HOW LESS THAN OR EQUAL 10 HfcLJIAN OF WATER USE REGIONS
196B FL:)W CONDITIONS I 1967 DOU AKSI
323
OF MANUFUCTUPING
PLANTS...
36
MANUFACTURING EMPLOY f'FNT
FLOW 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1 000000. TO
500000. TO
100000. TO
0. TO
500000
100000
50000
10000
5000000
1000000
500000
1C 00 00
M5XIMUM
0.
0.
0.
41773.
9299.
MINIMUM
0.
0 .
0.
10207.
2618 ,
AVERAGE
0.
0.
3 .
16582.
5617,
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
MINIMU'-l
AVERAGE
0.
0.
459014.
94147.
0.
0 .
1 2873.
69788.
0.
0 .
174028.
85717.
TOTHL
0.
0.
0.
182397.
l'»0420.
TOTAL
0.
0.
0.
5742917.
257151.
MAX
MIN
AVE
TOT
SO
*t*
0.
0.
0.
0.
0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
*2*
0 .
0.
0.
0.
0.
202.
32.
75.
2694.
33.
*/,*
43.
?.
9.
332.
8.
*5*
O.
0.
0.
0.
0.
*6*
123.
22.
49.
1774.
20.
*7*
0.
0.
(.'.
0.
0 .
*3*
0.
0.
0.
0.
0.
*9*
0.
0.
0 .
0.
0.
*10*
0.
0.
0.
0.
0.
S.O.
0.
0.
0.
9010.
1572.
S.D.
0.
0.
0.
74649.
13802.
NUMBER
C.
C.
0.
11.
25.
NUMBER
0.
0.
0.
33.
3.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SO
*l*
0.
0.
0.
0.
0.
*2*
0.
0 .
0.
a.
o .
27.
?.
6.
202.
5 .
DISTRIBUTION OF ANNUAL OG* TREATMENT COSTS 1* 1000)
*6* *7* *8* *9*
6.
0.
I .
6.
1.
D.
0.
0.
0.
0.
9 .
1.
2,
74.
2.
0.
0.
0.
0.
0.
0,
0.
0.
0 ,
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
I).
C.
'J.
0 .
*i2*
0.
0.
0.
0.
0 .
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUT1CN USED IS HIGHLY SKEWED.
-------
SIC CODE... 324
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FLOW LESS THAN OP. EQUAL TO PEDIAN OF WATER USE REGIONS
1968 FLJW CONDITIONS ( IS67 DOLLARS)
149
MANUFACTURING EMPLOYMENT
FLOW (MCY(
TOTHL CAPITAL COST
TOTAL ANNUAl OEM COST
TOTAL ANNUAL COST
MAXIMUM
1000.
1C29.
596276.
102218.
177945.
MINIMUM
75.
44.
68417.
5272.
13995.
AVERAGE
197.
177.
163508.
17389.
38155.
TOTAL
29415.
26312.
24362640.
2590972.
5685071.
S.D.
135.
124.
75500.
11611.
21026.
OEM
2590972.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1218131.
1875922.
TOTAL
5685025.
CO
COST R4NGF
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
I00000.
50300.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
*VF
TOT
SO
*1*
0.
0.
0.
0.
0.
*2*
0 ,
0.
0,
MAXIMUM
0.
102218.
58202.
44733.
9740.
MAXIMUM
0.
0.
745345.
497099.
97600.
MINIMUM
0.
132218 .
52982.
10058.
5272.
AVERAGE
0.
102218.
55603.
18286.
7655.
DISTRIBUTION Of INVESTMENT REQUIREMENTS
MINIMUM
0.
o.
519617.
100554.
85521 .
AVERAGE
0.
0.
632481,
202283.
92836.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000
*3* *4* *5* *6* *7* *8*
445.
62.
138.
2055«.
57.
152.
6.
26.
3804.
19.
0.
0.
0.
0.
3.
0.
0 .
M »
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0 .
TOTAL
0.
102218.
166809.
2084650.
237303.
TOT4L
0.
0.
1264961.
28724240.
464181.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
S.D.
0.
0.
2611.
6835.
1341.
S.D.
0.
0.
159617.
78244.
5509.
NUMBER
0.
1.
3.
114.
31.
NUMBER
0.
0.
2.
142.
b.
0.
0.
0.
0.
0.
*I2*
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SD
*1*
0.
0.
0.
0.
0.
0.
0 .
0.
0 .
(5.
DISTRIBUTION OF ANNUAL n £M TREATMENT COSTS (t 10001
#3* #4* *5* * 6* *7* *«*
82.
*..
14.
2100.
20.
1.
3.
491.
2.
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
0.
0.
0.
0.
0 .
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
c.
0.
*u*
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
SO
OR S.D. KEPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LbSS THAN OR E'JUAl fO MEDIAN OF WATER USE KEG IONS
1968 FL:iW CONDITIONS ( 1967 DOLLARS*
SIC CODE... 325
TOTAL NUMBER PF MANUFACTURING PLANTS... 77
MANUFACTURING EMPLOYMFNT
FLOW (WGY)
TPTiL C&PITU COST
TriTAL ANNUAL OS M COST
TOTAL ANNUAl COST
CO
CO
CJI
\f •
COST R4NGF
> 500000.
ICOOOO. TO
50000. TO
10000. TH
n. TO
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
500000
100000
^0000
1 00 00,
"; 000000
1000000
5000 OC
100000
MIN
we
TOT
so
*1*
0.
0.
0.
0.
0.
*,->*
n,
0.
MIX! MUM
2000.
78.
108154.
8604.
21593.
OSM
1 60 1 1 7 .
OISTR
MAXIMUM
0.
0.
0.
0.
8604.
MINIMUM
13C.
6.
20021.
907.
3456.
ANNUAt COST OF ViASTE TR
REPLACEMENT
136 168.
IBUTION OF OPERATION AND
MINIMUM
0.
0 .
0 .
<).
907 .
AVFRAGt
300.
1 ?.
35368.
2079.
657 I.
EATMhNT
INTEREST
209698.
MAINTENANCE COST
IWtRUGE
0.
0.
;i .
0.
2079.
TOTAI
23100.
12«9.
2723357.
160117.
S05985.
TOTAL
505933.
TOTAL
0.
0.
0 .
0.
16011 T.
MAXIMUM
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMU4 AVFR4GL
0. :j .
0. 0.
0 . 0 .
1/4465. 121789.
25026. 41065.
0.
0.
t J «
76396.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
o.
o.
o.
365366.
3038839.
*3*
*5*
*6*
*7«
*0*
*g*
*10*
9f> .
19 .
33.
2514 .
14.
12.
1.
2.
I 90 .
7 .
0.
0.
').
0 .
:> .
S.O.
280.
13.
15748.
1391.
3373.
S.D.
0.
0.
0.
0.
1391.
S.D.
0.
0.
0.
15735.
1 1801.
NUMBER
0.
77.
NUMtiER
0.
u .
G.
j.
74.
*12*
0.
0 .
d.
0.
(.1 .
0.
0.
(1 .
I).
0 .
0 .
0.
0 .
0.
0 .
0.
0.
0 .
0.
o .
0.
0.
0.
D ,
0.
0.
0.
0.
0.
0.
0.
0.
0.
n.
0.
••'AX
A vr
TOT
so
o.
o.
o.
o.
0 .
*2*
r.
«
o.
*3*
i ,
C. m
131.
1 .
OISTKI6UTI ON OF ANNUAL L)£M IREATMENT COSTS ($ 10001
*<,* *5* * A* * 7* *B* *9*
2.
0.
0 .
2''.
0.
0.
0.
0.
0.
1.
0.
0 .
0 .
0.
SO OR S.D. REPRESENTS STANDARD DFVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
*to*
0 .
0.
.
0.
0.
0 .
0 .
0.
0 .
^
«. *
0.
e .
0.
0 .
0.
0.
0.
0.
^
^/ •
0.
*u*
*12*
0.
0.
0.
-------
SIC CODE...
TOTHL NUMBER
326
OF MANUFACTURING PI ANTS...
* NAT IONAL TOTALS *
FLOW LCSS THAN OR EQUAL fC MEDIAN OF WATEP USE REGIONS
1968 FLOW CONDITIONS ( t<567 DOLl ARSI
47
MANUFACTURING EMPLOYMENT
Fl OW ( MGY)
TDTHL CAPITAL COST
TOTAL ANNUAL DEM COST
TOTAL ANNUAL COST
Ml XI MUM
1500.
112.
117368.
12236.
27141.
MINIMUM
80.
6.
20768.
903.
3601.
WERAGt
433.
27.
476HO.
33bl.
9406.
TOTAL
20364.
1264.
2240952.
157478.
442079.
S.D.
407.
23.
24959.
2561.
5701.
06M
15747S.
ANNUAL COST OF WASTE
REPLACEMENT
11204d.
TKEATMtNT
INTEREST
172553.
TOTAL
44207B.
COST RANGE
> 500000.
CO
CD
100000.
5000C.
10000.
0.
TO
TO
TO
TO
500000.
100000.
50000.
too oo.
COST RANGE
> 5000000.
I 000000. TO ^000000.
500000. TO 1000000.
100000 . TO 500000.
0. TO 100000.
MAX
MIN
&ve
TOT
so
*l*
*2*
DISTRIBUTION UF '1PERAT1
MAXIMUM MINIMUM
0. 0.
0 . 0 .
0. 0.
12236. 12236.
9397. 903.
ON AND MAINTENANCE COST
0.
0.
0 .
12236.
3157.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
MINIMUM
0.
0.
0.
146710.
98941.
0.
•i
_' *
0 .
100749.
75960.
AVERAGE
0 ,
0.
0.
11824D.
49338.
TOTHL
0.
0.
0.
12236.
145242.
TOTAL
0.
0.
0.
827677.
1973516.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
*3*
*4*
*5*
*6*
*7*
*10*
S.D.
0.
0.
0.
0 .
2216.
S.D.
0.
0.
o.
15247.
19676.
NUMBER
0.
0.
0.
I.
46.
NUMBER
0.
0.
0.
7.
40.
*u*
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
0.
102.
2r.
44.
2052.
22.
15.
1.
4.
189.
3.
0.
0.
0.
0.
0.
c.
0.
o.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
Q.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
MAX.
MIN
AVF_
TOT
SO
*l*
*2*
*3*
DISTRIBUTION OF ANNUAL 0£M TREATMENT COSTS (* 1000)
#4* *5* *6* *7* *8*
*10*
*11*
*12*
n.
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
10.
I.
3.
129.
2.
?.
0.
1 .
29.
0.
0.
0.
0.
a.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0 .
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
SO OR S.D. REPR6SFNTS STANDARD DEVIATION. THF DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE... 327
TtlTM NUMBER OF M4NUF^TUR ING P1ANTS...
* NATIONAL TOTALS *
FLOW LESS THUN OR SOUAL TO PEDIAN OF WATER USB REGIONS
1968 FLJW CONDITIONS ( IS67 DOLLARS)
MANUFACTURING EMPIOYMFNT
FLOW (MRYI
TOT&L C%PITAL COST
TOTAL ANNUAL OCM COST
TOTAL ANNUAL COST
MAXIMUM
700.
1711.
787635.
106175.
206214.
MINIMUM
5C.
12.
30360.
1697.
S553.
AVERAGE
148.
169.
153229.
16221.
35681.
TOTAL
41376.
47423.
42904000.
4541745.
9990720.
S.D.
ioa.
lt=7.
88207.
12450.
23553.
061
4541745.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
2145199.
3303606.
TOTAL
9990550.
to
<£>
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SO
0.
0.
0.
0.
0.
DISTRIBUTION OF OPERATION
MAXIMUM MINIMUM
0. 0.
106175. 106175.
65180. 51634.
49855. 10188.
9941. 1697.
AND MAINTENANCE COST
0.
106175.
^8748 .
19505.
6144.
MAXIMUM
0.
0.
•984544.
477886.
97768.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
0.
512990.
101706.
37950.
AVERAGt
0.
0.
633403.
20 ?524 .
72721.
TOTAL
o.
106175.
293738.
3588915.
552955.
TOTAL
0.
0.
3167014.
46900352.
3563324.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT
-------
* NATlDNAL TOTALS *
FLOW LESS THAN OR EQUAL TO MEDIAN CF WATER USE REGIONS
1968 FL3W CONDITIONS ( 1967 DOLLARS}
SIC CODE... 328
TOTAL NUMBER OF MANUFACTURING PLANTS... 38
MANUFACTURING EMPLOYMENT
FLOW (MGYI
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
T3TAL ANNUAL COST
MAXIMUM
500.
451.
293234.
28768.
66008.
06M
385172.
MINIMUM
54.
22.
44744.
2406.
8089.
ANNUAL COST OF WASTE
REPLACEMENT
224992.
AVERAGE
139.
115.
118417.
10136.
25175.
TREATMENT
INTEREST
346487.
TOTAL
5272.
4363.
4499835.
385172.
956651.
TOTAL
956650.
S.O.
101.
96.
59271.
6506.
13986.
00
CD
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO
500000. TO
100000. TO
0. TO
*l*
5000000.
1000000.
500000.
I00000.
DISTRIBUTION OF OPERATION
MAXIMUM MINIMUM
0. 0.
o. o.
0. 0.
28768. 10482.
9944. 2406.
AND MAINTENANCE COST
AVEfUGE
0.
0.
0 .
16648.
6338.
MAXIMUM
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
AVERAGE
0.
0.
0.
366543.
86472.
0.
0.
0 .
103708.
55930.
0 .
0.
0.
169338.
79332.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
TOT4L
0.
0.
0.
233069.
152102.
TOTeiL
0.
0.
0.
4910813.
713985.
*3*
#5*
*6*
*7*
*8*
*9*
*10*
*2*
DISTRIBUTION OF ANNUA1 OSM TREATMENT COSTS (* 1000)
*5* *6* *7* *8* *9*
*10*
S.D.
0.
0.
0.
6399 .
202C.
S.O.
0.
0.
0.
72392.
9496.
NUMBER
0.
0.
0.
14.
24.
NUMBER
0.
0.
C.
29.
9.
*ll*
*12*
MAX
MIN
&VE
TOT
SD
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
234.
4J .
102.
3883,
46.
59.
3.
16.
617.
13.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
MAX
MTN
AVE
TOT
so
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
23.
2.
3 .
313.
5.
6.
0.
2 .
72.
1.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD OPVIATION. THE DATft DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
SIC CODE... 329
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NAT IONAL TOTALS *
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FL3W CONDITIONS ( 1967 DOLLARS)
170
MANUFACTURING EMPLOY MFNT
FLOW
CO
^MF
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
I 0000 00. TO
500000. TO
100000. TP
0. TO
500000
100000
•50000
10000
•5000000
1000000
5COOOO
100000
0.
486195.
99501.
46055.
9905.
PAX I MUM
0.
2701953.
963057.
'.71056.
97927.
MINIMUM
0.
107207.
59515.
I 0045.
1317 ,
AVERAGE
0.
188301.
77379 .
2198*-.
5960.
DISTRIBUTION 01- INVESTMENT REQUIREMENTS
MINIMUM AVfcWAGb
0. 0.
1004533. 1529317.
522947.
1 1564.
33546.
207723.
7071 I.
"AX
MIN
&VF
TOT
SD
DISTRIBUTION OF TOTAL CAPITAL CCST (-QR TREATMENT ($ 1000)
TOTAL
0.
4330934.
69641^.
L 340903 .
458937.
TOTAL
0.
29057040.
4761783.
201490S8,
*
p.
0.
0 .
0.
0.
*2*
0 .
0.
r.
o .
0.
*3*
1320.
25.
217.
36926.
249.
*''*
841.
1 .
74.
12567.
139.
*5*
0
0
0
0
3
0.
0 .
0.
0.
0 .
0.
•'1.
0.
0.
0.
0.
0 .
0.
0 .
*9*
0.
0.
n .
0.
0.
0.
0.
0.
0.
0.
*11*
0 .
u.
0.
0.
0.
S.O.
0.
91911 .
12178.
10265.
2447.
S.D.
0.
496235.
152240.
100350.
17734.
NUMBER
0.
23.
9.
61.
7V.
NUMBER
0.
1°.
13.
97.
*1.
*12*
0.
0.
0.
0.
0.
MIN
4VF
TOT
*2*
DISTRIBUTION Oh ANNUAL 0CM TREATMENT CU31S it 1000)
*5* *6* * 7* * 3* *9*
0.
0.
0.
0.
c.
' J 9
0 .
fl.
0.
0 .
391.
1 .
32.
5508.
f.t .
95.
0.
8.
1119.
14.
0.
0.
0 .
0.
0 .
0.
' .
c .
0.
0.
*10«
*ll*
0 .
0.
0.
' ' *
u.
0 .
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
r>.
0 .
it.
0.
0 .
0.
c.
0.
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USLO IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS < 1967 OOLLARSI
SIC CODE... 33
TOTAL NUMBER OF MANUFACTURING PLANTS... 1137
o
FLOW (MGYI
TOTAL CAPITAL COST
TOTAL ANNUAL
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO 5000000
5000CO. TO 1COOOOO
100000. TO
0. TO
MAX
MIN
AVF
TOT
SO
*l*
37230.
6.
" 1192.
408688.
4324.
EMPLOY ME!
;OST
;M COST
35 T
)000.
)000.
1000.
)000.
MAXIMUM
NT 28000.
50279.
50768256.
3813776.
10261343.
OEM
1 14668048.
OISTR
MAXIMUM
3813776.
489468.
99293.
49334.
9943.
MINIMUM
1C.
3.
16809.
776.
2911.
ANNUAL COST OF WASTE
REPLACEMENT
54490848.
AVERAGE
902.
1195.
958502.
100851.
222596.
TREATMENT
INTEREST
83915872.
TOTAL
L025720.
1358716.
1089817088.
U4668048.
253091872.
TOTAL
253074768.
IBUTION OF OPERATION AND MAINTENANCE COST
MINI MUM
504294.
100160.
50490.
10112.
776.
AVERAGE
1411814.
206487.
73014.
210L6.
4900.
TOTAL
70590704.
29734112.
5403023.
61 1570L .
2832163.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
1000.
1000.
1000.
10 00.
*2*
1448.
1.
52.
57191 .
146.
KAXIMUM
63460320.
4591495.
977830.
4988<53.
99679.
DISTRIBUTION
*3* ***
5265. 5278.
14. 0.
319. 123.
291402. 140179.
613. 455.
MINIMUM
5044770.
1003880.
519026.
100581.
2 10 1 1 .
OF TOTAL CAPITAL 'CCST
*5* *6*
0. B36.
0. 0.
0. 66.
0. 47392.
0. 65.
AVERAGE
15857046.
2032356.
726846.
201375.
70406.
FOR TREATMENT ($ 1000)
*7* *8*
0. 1548.
0. 31 .
0 . 2 84 .
0. 57364.
0. 303.
TOTAL
887994624.
280465152.
61781872.
110353392.
21825824.
** *10*
0. 1078 L.
0. 0.
0. 4173.
0. 87640.
0. 2591.
s.o.
2033.
4448.
3711356.
344438.
807731.
S.O.
888968.
92952.
14500.
10298.
2233.
S.D.
14289856.
963843.
137837.
97223.
19236.
NUMBER
50.
144.
74.
291.
578.
NUMBER
56.
138.
85.
5^8.
310.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS ($ 1000)
*4* *5* *e* *7* *8* *9*
MAX
MIN
AVE
TOT
SO
797.
0.
64.
21951.
126.
36.
0.
2.
2003.
4.
2428.
0.
77.
70777.
240.
452.
0.
12.
14130.
41.
0.
0.
0.
0.
0.
153.
0.
4.
2930.
9.
0.
0.
0.
0.
0.
100.
1.
13.
2726 .
18.
0.
0.
0.
0.
0.
*to*
15.
0.
7.
151.
4.
*ll*
0.
0.
0.
0.
0.
*L2*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* N4MUN4L TOT4LS *
HOW LESS THAN OR EQUAL TO CEO IAN OH WATER USE
I96fl FLC1W CONDITIONS ( 1967 DOLLARS!
SIC CODE ... 331
TOTAL NUMBER OF MANUFACTURING PLANTS... 343
'EG IONS
SO
MANUFACTURING EMPLOY He NT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTM. M4NIML COST
MAXIMUM
?8000.
50279.
50768256.
3813776.
10?61343.
OEM
96032624.
MINIMUM
75.
5.
26818.
1642.
5048.
ANNUAL COST OF W\STE
REPLACEMENT
41682096.
AVERAGE
1582.
323'.'.
2430443.
.^79978.
588657.
TRE4TMCNT
1NTERES1
64190416.
TOTAL
542753.
1107894.
033642240.
96)32624.
201909483.
TOTAL
201905136
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST R4NG6
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
HiXlMUM
3813776.
439468.
992S3.
49093.
99C8.
MINIMU-1
504294.
101268.
50767.
10258.
1642 .
^VERAOt
1420428.
222168.
75021 .
23386.
5313.
TOTAL
69600992.
21105984.
3000836.
1917669.
409109.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
* 1 * * 2*
X 37230. 14'»8 .
N 6. 1.
E 1192. 133.
T 408688. 45562.
• 4324. 237.
MAXIMUM
6346032J.
4477290.
97?747.
489636.
98037 .
DISTRIBUTION
*3*
5265. 5278.
19. 1.
6C7. 332.
208284. 113742.
900. 777.
MINIMUM
5044770.
1019747.
528419.
101760.
3 3522 .
UF TOTAL CAPITAL CCST
*5* *6*
0. 0.
o. o.
0. ".
0. 0.
3 . 0 .
4VtR*Gt
17572864.
2050929.
744929 .
225064 .
7056rf.
FOR TREATMENT ($ 1000
*7* *8*
0. 1548.
0. 31 .
0. 284.
0. 57364.
0. 303.
TOT4L
790779136.
188685552.
37246432.
20930960 .
4445781.
*9* *10*
0. 0.
0. 0.
0 . 0.
0. 0.
0. 0.
S.D.
3291.
7596.
6368490.
583497,
1382915.
S.D.
896069.
100292.
13139.
I 18 19.
2254.
S.D.
15405579.
932636.
130983.
1 10070.
18376.
NUMBER
49.
95.
40.
82.
T7.
NUMBER
45.
92.
50.
93.
63.
*n*
o.
o.
0.
0.
0.
0.
0.
0.
0.
0.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ^i 1000)
*7* *8* *9*
MSX
MIN
AVE
TOT
SO
797.
0.
64.
21951.
126.
36.
0 .
4.
1332.
6.
2428.
1 .
172.
59002.
368.
452.
0.
32.
11021.
69.
0.
0.
0 .
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
100 .
1.
13.
2726.
18.
0.
0.
0.
0 .
0.
*10*
0.
0.
0,
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOTAL NUMBER
3312
OF MANUFACTURING
* NATIONAL TOTALS *
FLOW I ESS THAN OR EQUAL TO MFD IAN OF W4TER USE REGIONS
1968 FLOW CONDITIONS t 1967 DOLLARS)
PLANTS... 202
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
28000.
50279.
50768256.
3813776.
10261343.
180.
107.
193175.
?04Q6.
44939.
AVERNGE
2420.
5423.
4045423.
466212.
979991.
TOTAL
488906.
1095389.
817175552.
94174832.
197958240.
S.D.
4063.
9295.
7913614.
703060.
1696763.
OEM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
^4174832.
40858768.
6292248C.
TOTAL
197956080.
to
COST RANGE
> 500000.
looooo. Tn
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
500000.
I 00000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SO
37230.
19.
2012.
406472.
5492.
*2*
1448.
15.
220.
44424.
277.
MAXIMUM
3B1377f.
489468.
99293.
490*53.
0.
MAXIMUM
685371 04.
4835471.
9975?6.
480382.
0.
MINIMUM
504294.
101268.
52008.
20406.
0.
AVERAGE
1420428.
222557.
76106.
36298.
0.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5448349.
1039591.
502253.
?60786.
0.
AVCRAGE
18978704.
2150060.
754005.
397491,
0.
TOTAL
69600992.
20920384.
2892014.
762262.
0.
TOTAL
854041856.
208555904.
35438240.
5167385.
DISTRIBUTION OF TOTSL CAPITAL CCST FOR TREATMENT ($ 1000)
*6* *7* *8* *9*
5265.
115.
973.
196553.
1023.
5273.
13.
556.
112366.
950.
0.
0.
3.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
c.
0.
0.
1548.
31.
284.
57364 ,
303.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
896069.
100758.
12533.
8176.
0.
S.D.
16638015.
1018481.
129437.
67357.
0.
*11*
0.
0.
0.
0.
0.
NUMBER
49.
94.
38.
21.
0.
NUMBER
45.
97.
47.
13.
0.
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
797.
5.
106.
21432.
150.
*2*
36.
I.
6 .
1238.
7.
*3*
2428.
11.
287.
57947.
445.
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (t 10001
*6* *7* *8* *9*
452.
?.
54.
1C832.
83.
0.
0.
0.
0.
0.
0.
0.
0.
0.
c.
0.
0.
0.
0.
0.
100.
I.
13.
2726.
18 .
0.
0.
0.
0.
0 ,
*10*
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THF DAT* DISTRI BUT ION US ED IS HIGHLY SKEWED.
-------
* N»noNM_ TOTALS *
FLOW LESS THAN HP. EQUAL ID l"fcOIAN CF WATER USE
196S FLOW CONDITIONS ( 1967 DOLLARS)
SIC CODt... 332
TOTAl NUMBER OF MANUFACTURING PLANTS... 2?3
•> tG IONS
o
0}
MANUFACTURING EMPLOYMFNT
FLOW CMGY!
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTU 4NNU&L COST
COST R&NGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TH
500000.
100000.
50000.
10000.
CCST RANGt
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
o. rr looooo.
TOT
*1*
0.
0.
0.
0.
0.
61 .
1 .
8 .
1706 .
H.
MAXIMUM
4590.
1100.
520163.
62415.
128'.76.
OEM
1366483.
DISTR
fi. XI MUM
0.
U.
62415.
44002.
9112.
MI NIMUM
188.
3.
168CS.
776.
2911.
ANNUAL COST OF W4STE
Pf PLACEMEN f
990502.
AVERAGE
545.
d4.
888)4.
6l2fl.
17410.
TREtTMtNT
INTEREST
1525372.
TOTAL
121497.
18643.
19810048.
1366483.
3882383.
TOTAL
3382357
IBUTION UF OPERATION AND MAINTENANCE COST
MI NI MU"|
0.
0 .
54623.
10194.
776 .
AVERAGE
0.
0.
58519.
20570.
4U8d.
TOTAL
0.
0.
U7039.
43 1980.
817506.
DISTRIBUTION OF INVESTMENT Kt QUI HF MF.NTS
PAXIMUM
0.
0.
650204.
4988S3.
09679.
DISTRIBUTION
3* *4*
0 . 81 .
0. 0.
0. 6.
0. 1375.
0. 11.
MINIMUM
0 .
0.
62 534/ .
100619.
2 1011 .
OF TOTAL CAPITAL CCST
*5 *6*
0. 378.
0. 16.
75.
0. 16729.
0 . 54 .
HVER4GE
0.
0.
637773.
162167.
67S82.
FDR TREATMENT ($ 1000
*7* *8*
0. 0.
0 . 0 .
o. o.
0. 0.
0. 0 .
TOTAL
0.
0.
1275545.
14595068.
8892532.
*9* *10*
0. 0.
0. 0.
0 . 0.
0. 0.
0. 0.
*11*
0.
0.
0.
0.
0.
S.D.
622.
146.
72366.
7957.
17084.
s.o.
0.
u.
5510.
I 1258.
1990.
S.D.
0.
0.
17610.
90529.
20122.
NUMBER
0.
0.
2.
21.
200.
NUMBER
0.
0.
2.
90.
131.
*12*
0.
0.
0.
0.
0.
WIN
1VF:
THT
so
*1*
0.
0.
0.
0.
0.
*2*
3.
0 .
I.
148.
n.
0.
0.
0.
0.
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS it 1000)
*4* *5* *6* *7* * 8* *9*
11,
0.
1 .
202.
1.
0.
0.
' ' •
0.
0.
48.
0.
5.
1016.
6.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0 .
0.
0.
0.
0.
0.
0.
0.
0.
OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOTAt NUMBER
3321
OF MANUF4CTURING PL4NTS.,
* NATIONAL TOTALS *
FLOW LESS TH&N OR EOU4L TO MEOUN OF WSTER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
117
M4NUF4CTUR ING EMPLOYMENT
F I OK ( MO Y »
TTTA1. CAPITAL COST
TOTAL ANNUAL 0£M COST
THTAL ANNUAL f.OST
COST RANGE
> 500000.
loooon. TO
50000. TO
10000. TO
r>. TH
O COST RANGF
*<• ,
500000.
100000.
50000.
iooor.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
M&X
MIN
AVE
TOT
SO
0.
0.
C.
0.
o.
*2*
61.
^ .
11.
?",
II .
MAXIMUM
4590.
I 100.
520163.
62415.
128476.
OEM
1001294.
DISTR
I»AX I"UM
0.
0.
62415.
440C2.
91 12.
MINIMUM
?00.
14.
39397.
1980.
6984.
ANNUAl COST OF kASTE
REPL^FMENT
674C23.
AVERAGE
583.
126.
115218.
8558.
23190.
TREATMENT
INTEREST
1037996.
TOTIVL
68198.
14719.
13480468.
1001294.
2713286.
TOTM.
2713312
IBUTION OF OPERATION AND MAINTENANCE CCST
MINIMUM
0.
0.
54623.
1 0333.
1980.
AVERAGE
0 .
0.
58519.
22245.
4988.
TOTAL
0.
0.
117039.
400417.
483839.
DISTRIBUTION OF INVESTMENT RETIREMENTS
MAXIMUM
0.
0.
624196.
4/8937.
99350.
DISTRIBUTION
3* *4*
0. 81.
0. I .
C. 9.
n. 1080.
0. 14.
MINIMUM
0 .
0.
600328.
11T622 .
47276.
OF TOTSt CAPITAL CCST
*5* *fr*
0. 378.
0. 36.
J. 95.
0. 11171.
0 . t4.
AVERAGE
0.
0.
612262.
172601 .
81915.
FCR TREATMENT ( $ 1000
* 7* * 8*
0. 0.
n. o.
J . 0 .
0. 0.
0. 0.
TOTAL
0.
0.
1224523.
10528644.
4473415.
*9* *10*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
S.D.
792.
190.
88406.
10208.
21381.
s.o.
0.
0.
5510.
11327.
1691.
S.O.
0.
0.
16902.
100075.
14834.
NUMBER
0.
0.
2.
18.
97.
NUMBER
0.
0.
2.
61.
54.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
M IN
AVF
TOT
SO
OISTR IBUTIUN IF ANNsJAL OEM TREATMENT COSTS t* 1000)
*7* *8*
0.
0.
*
0.
0.
0.
0.
0.
*2*
3 .
(- *
I .
91.
n.
*3*
0.
0.
0.
0.
f).
*4*
11 .
0.
1.
155.
2.
*5*
0.
0.
0.
0.
0.
*6*
48
1
6
756
8
*10*
*12*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
o.
0.
0.
0.
0.
SD OR S.O. REPRESENTS STIVNOURD DEVIATION. THF DAT* OISTRIBUTJCN USED IS HIGHLY SKEWED.
-------
SIC CODE... 3331
TOTAL NUMBER OF MANUF !»C TUR ING PI ANTS...
* NATKINAL TOTALS *
FLCW LESS TH*N OR EQUAL TO KEOUN UF WATER USE REGIONS
1068 FIOW CONDITIONS « 1967 DOLLARS)
71
o
en
f^NUF&CTUR ING EMPLOYMENT
FLOW 501000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SO
0.
0.
0.
0.
0.
243.
5.
100.
2698,
74 .
MAXIMUM
1870.
3021.
1688034.
?42557.
446121.
nc,M
2771793.
OISTR
MAXIMUM
C.
242557.
'1257.
3C875.
8367,
MINIMU'
! 0.
19.
43335.
3132.
9774.
ANNUAL COST OF WASTE
REPLACEMENT
950126.
WER^GF
7?8.
1239.
703797.
102659.
192041.
TREATMENT
INTtROST
1463192.
TOTAL
19654.
33443.
19002512.
2771793.
5185112.
TOT&L
51851 10
IBUTION OF "IPFRATION AND MAINThNANCfc CCST
MINIMUM
0.
100192.
71257.
13589.
3132.
AVFRAG6
0.
16 1336.
71257.
19245.
4588.
TOTAL
0.
2581373 .
71257.
96224.
22941 .
DISTRIBUTION OF INVESTMENT RETIREMENTS
MAXIMUM
0.
2194442.
9B5601 .
378175.
74001.
DISTRIBUTION
*3* *4*
962. 484.
40. 3.
42«. 175.
11579. 4726.
286. 147.
MINIMUM
o .
101 4376.
716740.
I 10083.
62900.
OF TOT 41 CAPITAL CCST
*5* *6*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
AVERAGE
0.
1462304.
819261 .
249670.
68795.
FOR TREATMENT ($ 1000
* 7* * 8*
0. 0 .
0. 0.
0. 0.
0. 0 .
0. 0.
. TOTAL
0.
20472256.
2457784.
1498021.
275180.
)
*g* *10*
0. 0.
0. 0.
0. 0.
0 . 0.
'•'. 0.
S.D.
637.
1034.
506120.
81902.
145293.
S.D.
0.
48463.
0.
7155.
2205.
S.D.
0.
332594.
145349.
82339.
4549.
*ll*
0.
0.
0.
0.
0.
NUMBER
0.
16.
1.
5.
5.
NUMBER
0.
14.
3.
6.
4.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*2*
*3*
DISTRIBUTION OF ANNUAL OCM TREATMENT COSTS it 1000)
*4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
7.
I .
3 .
87.
2.
190.
2.
80.
2163.
64.
46.
0.
19.
522.
16.
3.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
i.' .
0 .
0.
0.
0 .
0.
0.
0 .
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DFVI4TION. THF D&H DISTRIBUTION UStC IS HIGHLY SKEWED.
-------
SIC CODE 3 3
TOTAL NUMBER OF MANUF4C TUR ING PUNTS...
* NATIONAL TOTALS «
FLOW LESS TH»N OR EQUAL TO fEDHN OF W »T ER USE REGIONS
l68 FLOW CQNDITIONS ( 1<367 DOLLARS)
MANUFACTURING EMPLOYMENT
FLOW (MGYI
T3TAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
971.
554701.
80C23.
I 50470.
MINIMUM
55.
83.
94683.
7022.
19047.
AVER4GC
267.
394.
276591.
35252.
TOM 9.
2138.
3152.
2212725.
282019.
563035.
s.o.
164.
290.
149386.
23419.
42384.
282019.
ANNUAL COST OF kASTE
REPLACEMENT
I 10*36.
TREATMENT
INTEREST
17038C.
TOTAL
563035,
O
V)
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
L00000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO looooori.
100000. TO 500000.
0. TO 100000.
MIN
AVE
TOT
SD
0.
0.
0.
0.
0.
0.
^.
o.
0.
PAX IMUM
C.
0.
80023.
45421.
702?.
MAXIMUM
0.
0.
7211 It.
448421.
0.
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
MIN[MUM
0.
0.
90023.
14644.
7022.
AVERAGE
0.
3.
80023.
32496.
7022.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0 .
0.
72 II II.
1230R8.
0.
AVERAGE
0 .
0 .
72 1111 .
307918 .
0.
TQTAt
0.
0.
80023.
1Q4974.
7022.
TOTAL
0.
0.
72 I UI .
2155429.
0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
*4* *5* *t* *7* * 8* *9*
416.
84.
221 .
1765.
108.
139.
11.
56.
448.
41.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0 .
0.
*io*
0.
0.
0.
0.
0.
S.D.
0.
0.
0.
14087.
0.
S.O.
0.
0.
0.
138211.
0.
NUMBER
0.
0.
1.
6.
I.
NUM BER
0.
0.
I .
7.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*l*
0.
0.
0.
0.
0.
0.
0.
0 .
o.
0.
*3*
65.
6.
28.
228.
19.
DISTRIBUTION E1F ANNUAL OEM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
15.
1.
7.
54.
5.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
$n OR S.O. REPRESENTS STANDARD DEVIATION. THE OAT* DISTRIBUTION USEC IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLCW LESS THAN Or< EQUAL TO MeDUN OF W»TER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
SIC CODE... 3333
TOTAt NUMBER OF MANUF&CTUP ING PL&NTS... 15
M4NUF4CTUP ING EMPLOYMENT
FLOW (HT.YJ
TOTAL CAP I TAL COST
TOTAL ANNUAL 0£M COST
TOTAL ANNUAL COST
MAXIMUM
2500.
2059.
1020668.
169C22.
298647.
MINMll-'
150.
124.
I 17743.
11815.
26769.
AVERAGE
677.
472.
304204.
41060.
79694.
TOT&L
10150.
7073.
4563067.
M5902.
1195412.
s.o.
683.
502.
231269.
39806.
69070.
615902.
ANNUAl COST OF V,ASTfc
REPLACEMENT
228153.
TREATMENT
INTEREST
351356.
TOT4L
1195411,
DISTRIBUTION OF OPERATION AND MAINTENANCE CCST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGF
> 5000000.
1000000. TO "iOOOOOO.
500000. TO 1000000.
100000. TO 50000P.
0. TO 100000.
fAXIHUM
0.
16902?.
7 8064 .
49C49.
0.
MAXIMUM
0.
M INIMUM
0.
169022.
5 1666 .
I 181 5.
0.
DISTRIBUTION OF I
MINIMUM
0 .
1 3?6867.
562959.
1 53065 .
0.
AVERAGE
' ' 9
169022.
60564.
24108 .
0.
NVESTMENT RECUIREMENTS
AVEWAGfc
0.
13?6867.
629804.
278793.
0.
696649.
476017.
0.
DISTRIBUTION OF TOT&L C!kPIT&L CCST FOR TREiTME^T ($ 1000)
TOTAL
0.
169022.
181693.
265188.
0.
TOTAL
0.
1326867.
1259607.
3345515.
0.
S.D.
0.
0.
15156.
1C232.
0.
S.D.
0.
0.
94538.
102618.
0.
NUMBER
0.
I.
3.
11.
0.
NUMBER
0.
1.
2.
12.
0.
AVF
TOT
so
*1*
0.
0.
0.
0.
r.
*2*
0.
0.
0.
0 ,
0.
*3*
711.
IC2.
237.
3562.
156.
311.
16.
67.
1001.
75 .
0.
0.
3.
0.
0.
0.
0.
0.
0.
0.
*7*
0.
0.
•J.
0.
0.
*8*
0.
0.
0 .
0 .
.1.
*g*
0.
0.
0.
0 .
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
"AX
M IN
AVC
TOT
so
*i*
0.
0.
0.
0.
0.
0.
(.' •
p .
0.
0.
*3*
136.
10.
33.
497.
37.
DISTRIBUTION OF ANNtAL 06K TREATMENT COSTS t* 1000)
*4* *5* *6* *7* *8*
33.
2.
8.
118.
8.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0 ,
0.
0.
0 .
0.
0 .
0.
0.
0 .
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO PR S.D. REPRESENTS ST4ND4RD DEVIATION. THF D4T1 DISTRIBUTION USFC IS HIGHLY SKEWED.
-------
sic CODE...
TOTAL NUMBER
3334
OF MANUF^TURING PUNTS...
* MATIONAL TOTALS *
FLOW LESS THAN OR EQU&L TC MEDIAN OF W M EP USE REGIONS
1963 FLOW CONDITtGNS ( 1967 DOLLARS)
2 I
MANUFACTURING EMPLOYMENT
FLOW (MGVI
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
3500.
6997.
12448729.
313776.
1894764.
784.
915.
1866862.
59054.
296145.
AVERAGF
1598.
2806.
4969214.
138916.
770007.
TOT4L
33558.
58916.
104353504.
2917233.
16170144.
S.O.
787.
1764.
2943535.
79499.
452500.
ANNUAL COST OF WASTE
OEM REPLACEMENT
2917231. 5217674.
TREATMENT
INTEREST
8035215.
TOTAL
16170122.
COST RANGE
> 500000.
100000. TO 500000.
5000C. TO 100000.
10000. TO 50000.
0. TO 10000.
CPST RANGE
> 5000000.
1000000. TP 5000000.
500000. TP 1000000.
100000. TO 500000.
0. TO 100000.
MIN
AVF
TOT
SO
0.
0.
0.
0.
0.
*2*
0.
1.
0.
0.
0.
DISTRIBUTION OF OPERATION
MAXIMUM MINIMUM
0. 0 .
313776. 11C787.
98924. 59054.
0. 0.
1. 0.
AND MAINTENANCE CCST
AVERAGE
0 .
195045.
77174.
0.
0.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
HAXIMIIM
16183338.
4775151.
0.
0.
0.
MINIMUM
5631202.
2426919.
Q.
• *
0.
AVERAGE
9472491.
3721330.
0.
0 .
0.
TOTAL
0.
2145494.
771743.
0,
0.
TOTAL
94724912.
40934640.
0.
0,
0.
DISTRIBUTION OF TOTAL C4P1THL CCST FOR TREATMENT ($ 1000)
*4* *5* *6* *7* *8* *9*
1066.
312.
560.
11762.
209.
602.
85.
236.
4951.
144.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
0.
S.D.
0.
71862.
14846.
0.
0.
S.D.
3567672.
710561.
0.
0.
0.
*10*
10781.
1470.
4173.
87640.
2591.
*lt*
0.
0.
0.
0.
0.
NUMBER
0.
H.
10.
0.
0.
NUMBER
10.
11.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SO
*1*
0.
0.
0.
0.
0.
*2*
0.
o.
0 .
c.
0.
*3*
241 .
45.
106.
2228.
61.
DISTRIBUTION QF ANNUAL OEM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
5B.
11.
26.
538.
15.
0.
0.
0.
0.
0.
0.
0.
0.
0.
(1.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
0.
*10*
15.
4.
7.
151.
4.
*H*
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS ST*NDM«D DEVIATION. THE D&T\ DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE HEGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
SIC CODE... 3*
TOTM. NUMBER OF M4NUF4CTUPING PLANTS... 1017
O
co
MANUFACTURING EMPLOYMENT
FLOW IMGYJ
TOT ML CAPITAL COST
TOTAL ANNUAL C6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SO
0.
0.
0.
0.
0.
100 .
I,
8.
8302.
8.
MAXIMUM
14000.
1896.
1037925.
IR3095.
314911.
06M
9562277.
DISTR
MAXIMUM
0.
183095.
93799.
49985.
9967.
MINIMUM
54.
2.
11417.
650.
2154.
ANNUAL COST OF WASTE
REPLACEMENT
4993804.
AVER'VGE
565.
77.
96313.
9221.
21451.
TREATMENT
INTEREST
7690455.
TOTAL
586016.
79555.
99876096.
9562277.
22245152.
TOTAL
22246528.
IBUTION OF OPERATION AND MAINTENANCE COST
MINIMUM
0.
102258.
50475.
10091.
650 .
AVERAGE
0.
139244.
72368.
16699.
5213.
TOTAL
0.
556976.
868420.
4091371 .
4045590.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
M XT MUM
0.
1297405.
881528.
470211.
99908 .
DISTRIBUTION
* 3* *4*
6 IB. 302.
10. 0.
74. 12.
76796. 12912.
56. 21.
MINIMUM
0.
1079237.
519048.
100151.
14272.
OF TOTAL CAPITAL CCST
*5* *6*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
AVERAGE
0.
1L52616.
658743.
155896.
63580.
FOR TREATMENT (* 1000
*7* *8*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
TOTAL
0.
3457849.
3563661.
80910128.
31917280.
I
* 9* * 1 0*
18. 0.
0. 0.
2. 0.
1866. 0.
2. 0.
S.O.
875.
133.
86014.
12771.
23597.
*11*
0 .
0.
0.
0.
0.
S.D.
0.
34202.
16189.
8115.
2513.
S.O.
0.
125393.
132322.
65311.
23892.
NUMBER
0.
4.
12.
245.
776.
NUMBER
0.
T.
13.
519.
502.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*1*
*2*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (* 1000}
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
4.
0.
I.
704.
0.
133.
0.
6.
6653.
9.
37.
0.
2.
1785.
3.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
n.
0 .
0.
9.
0.
0.
420.
I .
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED,
-------
SIC CODE 35
TOTAL NUMBER OF MANUFACTURING PLANTS..
* NATIONAL TOTAtS *
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
l968 FL3W CONOITIONS ' l967 DOLLARS)
790
FLOW 500000.
100000. TO 500000.
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
10OOOOO. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO
MAX
MIN
AVE
TOT
SO
*r*
o.
0.
0.
0.
0.
*
(PLOY ME t\
)ST
< COST
>T
MAXIMUM
IT 36000.
3502.
1827862.
256551.
488689.
MINIMUM
-------
* NATIONAL TOTALS *
FLOW LESS THAN OR EQUAL TO CEDIAN OF WATER USE REGIONS
1968 FLDW CONDITIONS ( 1967 OOILARSI
SIC CODE... 36
TOTAL NUMBER OF MANUFACTURING PLANTS... 817
MANUFACTURING EMPLOYMENT
FLOW IMGYI
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOTAL ANNUAL COST
MAXIMUM
32800.
4600.
1928896.
370238.
615258.
MINIMUM
60.
8.
26463.
1555.
5054.
4VERAG6
1535.
134.
14296.
31932.
TOTAL
1254103.
109859.
II3465760.
11679501.
26088192.
S.O.
2272.
269.
138511.
22979.
40371.
OEM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
I 1679501.
5673287.
873685S.
TOTAL
26089632.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO I 0000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
KAXIMUM
0.
370288.
94245.
498S4.
9939.
fAXIMUM
C.
241 II 20.
951697.
497S58.
99972.
MINIMUM
0.
190996 .
52879.
10001.
1555.
HVEiUGE
0.
162464.
68579.
18949.
6109.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1052456.
533424.
100345.
33078.
AVERAGE
:).
1466815.
711662.
184741.
75927.
TOT4L
0.
1787104.
1028686.
5949989.
2913796.
TOTAL
0.
8800895.
14944901.
98651952,
19437312.
S.D.
0.
88604.
12589.
8710.
2033.
S.D.
0.
597750.
144722.
81903.
15482.
NUMBER
0.
11.
15.
314.
477.
NUMBER
0.
6.
21.
534.
256.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 10001
*1*
*2*
*3*
MAX
MIM
WE
TOT
SO
0.
0.
0.
0.
0.
184 .
2.
1?.
9822.
13.
1026.
23.
103.
83903.
83.
689
1
22
17635
41
*5*
0.
O.
0.
0.
0.
*6*
0.
0.
0.
0.
0.
*7*
0.
0.
0.
0.
*8*
0.
0.
0.
0.
0 .
*9*
30.
0.
3.
2105.
2.
*10*
0.
0.
0.
0.
0.
*u*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
A VF
TOT
SD
*l*
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (t 1000)
*4* *5# *6* *7* *8* *9*
0.
0.
0.
0.
0.
6.
0 .
I .
660.
0 .
270.
1 .
tr.
8252.
17.
76.
0.
J.
2240.
5.
3.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
0.
18,
0.
I.
*10*
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
SIC CODE... 37
TOTAL NUMBER OF MANUFACTURING PLANTS... 562
MANUFACTURING EMPLOYMENT
FLOW (MGVI
TOTM. CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
38000.
2374.
1261523.
223489.
379374.
MINIMUM
150.
4,
16197.
897.
2954.
AVERAGE
1923.
147.
141922.
(6046.
34069.
TOTAL
1080478.
82337.
79760160.
9017878.
19146784.
S.D.
3843.
271.
159695.
24791.
44954.
O&M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
9017878.
3988007.
614152?.
TOTAL
19147408.
COST RRNGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
5000CO. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
-------
* N&TIUN4L TOTALS *
FLOW OF MOST EFFICIENT MATER USE RfcGlCN USED THROUGHOUT
1968 FLOW CONDITIONS ( 1967 CMJLIARSI
STC COOf... ?0
TOTAL NUMBER OF MANUFACTURING PtANTS... 4494
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OCM COST
TOTM. &NNU4L COST
MAXIMUM
5500.
39C50.
2199', 304.
1665295.
4458571.
MINIMUM
3.
I.
15208.
614.
2593.
AVERAGL
?06.
92.
141675.
7^86.
25383.
TOTAL
924045.
413987.
636688640.
33193072.
114070192.
S.O.
325.
647.
432207.
30751.
85439.
ANNUAL COST (IF WSSTE
OEM REPLACEMENT
3M93072. 31834416.
TRESTMENT
INTEREST
49024992.
TOTAL
114052480.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50300.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO I00000.
DISTRIBUTION OF OPERATION
MINIMUM
16652S5. 1665295.
499293. 102934.
98575. 51216.
49802. 10016.
9997. 614.
AND MAINTENANCE COST
27492880.
4353655.
990714.
498515.
99965,
166^295.
209811.
71054.
18884.
34U.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5346841.
1005675.
50060' .
100030.
19010.
4VERAGE
10415597.
1736216.
690711 .
202315.
57753.
TOTAL
1665295.
4406037.
3197436.
10782836.
13152329.
TOT4L
62493584.
I 30216208.
1056J'8832.
352230656.
145479680.
S.D.
0.
110242.
15522.
9279.
2192.
S.D.
8463787.
788965.
136381.
92126.
21710.
NUMBER
1.
21.
45.
571.
3856.
NUMBER
6.
75.
153.
1741.
2519.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 10001
MAX
MIN
&VF
TOT
SO
0.
0.
0.
0.
0.
*2*
2347.
0.
15.
37766.
60.
*3*
172.
0.
23.
27152.
15.
*4*
10419.
0.
59.
42608.
423.
*5*
60.
7.
15.
10822.
1.
5464.
0.
1C5.
272451.
185.
*7*
0.
0.
0.
0.
0.
*B*
3764.
5.
54.
243569.
95.
*9*
25.
1.
3.
2502.
3.
0.
0.
0.
0.
0.
* 11*
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
MIX
MIN
AVE
TOT
SD
*1*
0.
0.
0.
0.
0.
*2*
28.
0 .
t .
1687.
1 .
*3*
15.
0.
1 .
1296.
1.
DISTRIBUTION OF ANNUAL OEM TREBTMENT COSTS ($ 10001
*7* *8* *9*
359.
0.
3.
2337.
15.
42.
1.
4.
2709.
4.
1116.
0.
6.
16715.
27.
0.
0.
0.
0.
0.
162.
0.
2.
601 1 .
3.
8.
0.
1.
445.
I .
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.O. REPRESENTS STANDARD DEVIATION. THE OAT4 DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 22
TOTAL NUMBER OF MANUFACTURING PLANTS...
* N4TTCN4L TOTALS *
FLOW OF MOST EFFICIENT WATER tSE REGICN USED THROUGHOUT
1968 FLOW CONDITIONS { 1967 DOLLARS)
1021
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL CGM COST
TOT4L ANNUAL COST
MAXIMUM
9000.
2422.
1307587.
77260.
233269.
MINIMUM
35.
10.
4156S.
1493.
6998.
AVERAGE
537.
159.
206640.
8840.
35079.
TOTAL
548467.
161918.
210979424.
9025367.
35815776.
S.D.
602.
195.
142996.
7362.
25150.
ANNUAL COST OF WASTE
OEM REPLACEMENT
9025367. 10548970.
TREATMENT
INTEREST
16245407.
TOTAL
35819728.
*»•
COST RANGE
> 500000.
I00000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. Tr 100000.
MAX
MIN
AVE
TOT
SO
*2*
MAXIMUM
0.
0.
7726C.
49752.
9996.
fAXIVUM
0.
1634483.
960954.
497712.
99870.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MINIMUM
0.
0.
51924.
10046.
1493.
AVERAGE
0.
0.
54810.
16584.
5579.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1007220.
502827.
100258.
5 1962.
&VER4GE
0.
1215650.
650179.
235417.
Ul
-------
* fOTICNU TOTALS *
FLOW OF MOST EFFICIENT MATER USE REGICK USED THROUGHOUT
1968 FLOW CONDITIONS < 1967 DOLLARS!
SIC CODE... 24 '
TOTAL NUMBER OF MANUFACTURING PIANT$... 405
MANUFACTURING EMPLOYMENT
FLOW (MGV)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
14500.
7138.
29C8433.
235249.
6C4620.
MINIMUM
-•75. •',
,2*.
2150.
AVERAGE
369.
221..
205855.
13116.
49419.
TOfAL
149384.
89627.
11*771376.
5312013.
20014656.
S.D.
774.
409.
212153.
15214.
41995.
OCM
ANNUAL COST OF W»$TE TREATMENT
REPLACEMENT INTEREST
5312013.
578* 56».
89 14 39 1 .
TOT Al
20014960.
cn
COST R«NGE
> 500000.
100000. Tf!
"JOOOO. TO
10000. TO
o. Tn
500000.
100000.
5000C.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. Tn 1000000.
100000. Tn 500000.
0. TC 100000.
MIN
IVVE
TOT
so
0.
0.
0.
0.
0.
*2*
0 ,
0.
0.
0,
c.
OIST" fBUT ION OF J PER ATI ON
MINIMUM
0. 0.
235249. 235?49.«
8227C. 50092.
48079. 1002 ). . ,
9970. 2150 .
AND
MAINTENANCE COST
&VERAGE
0.
235249.
61082.
6661
DISTRIBUTION OF INVESTMENT REQUIREMENTS
0.
3615541.
983634.
4^6428.
0.
MINIMUM
0.
1039375.
500791.
100665.
0.
AVERAGE
*
1478944.
673431 .
282397.
0.
TOTU
0.
235249.
488658.
3195966.
1392194.
0.
14789440,
31651248.
98274160.
0.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT 1$ 1000)
*•}* *«.* *5* *6* *7* *8* *9*
0 .
0.
0.
0.
0.
752.
3.
26.
10476.
0.
0.
0.
0.
0.
1064.
48.
1 50.
60853.
89.
0.
0 .
0.
3.
0.
1073.
29.
1 l« .
44441.
fll .
0.
0.
0 .
0.
0.
*IC*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
S.D.
0.
0.
U675.
8079.
2201.
S.D.
0.
787362.
130145.
9C217.
0.
NUMBER
0.
1.
a.
187.
209.
NUMBER
0.
10.
47.
348.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*1*
0.
0.
0.
o.
0.
0.
r .
o.
*3*
P.
0 .
n .
0.
p.
OISTRlBUTTON OF ANN»AL OEM TREATMENT COSTS (t 10001
*4* *5* *6* *7* *8* *9*
49.
0.
2.
858.
3.
3.
0.
0.
0.
o.
145.
I.
8.
3197.
9.
0 .
0.
41 .
1.
3.
1257.
3.
0.
0 .
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
c.
0.
0.
0.
0.
0.
0.
0.
0.
SO PR S.O. REPRESENTS STANDARD DEVIATION. THF DATi OISTRI9UTICN USED IS HIGHLY SKEWED.
-------
SIC CODE... 26
TOT4L NUMBER OF M4NUFACTURINC PLANTS...
* NATIONAL TOTALS *
t-LOW OF MOST EFFICIENT WATER USE REGION USED THROUGHOUT
FLTrf CONDITIONS ( l<367 OOLLARi)
R62
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOT*L C4PIT4L COST
TOTAL ANNUAL 0£M COST
TOTAL ANNUAL COST
MAXIMUM
4000.
25089.
1008968C.
1142226.
3566614.
MINIMUM
1 2.
8.
22989.
771.
3767.
AVERAGF
447.
1072.
831840.
53973.
159885.
TOTAI
3855U .
923693.
718770432.
46524528.
137821072.
S.D.
540.
2295.
1601021.
109578.
311522.
OGM
465245?8.
ANNUAL COST OF HASTE TREATMENT
REPLACEMENT INTEREST
35938512.
553452 500000.
100000. TO 500000.
50000. TO 1POOOO.
10000. TO 50300.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1COOOOO.
100000. TO 500000.
0. TO 100000.
MAX
MFN
»VE
TOT
SO
*l*
n.
o.
0.
0.
n.
*2*
0,
0.
0.
a.
o.
DISTRIBUTION DF OPERATION
MAXIMUM MINIMUM
1142226. 513107.
471641. 10 122! .
99358. 50438.
49217. 1C187.
9929. 771.
AND
MAINTENANCE COST
JVPR4GE
200544.
7l?89.
4409.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
PAXfMUM
23862056.
492 1927.
997460.
4951C7.
99865.
MINIMUM
51382)5.
1018279.
504180.
100205.
28736.
AVERAGt
9340080.
1907444.
719261.
249394.
73605.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT ($ 1000
TOTAL
9288647.
19653312.
7699183,
8448124.
L441588.
TOTAL
298882560.
371951616.
1524832S6.
62597872.
12660053.
*3*
O.
0.
n.
o.
o.
564?.
I.
168.
112531.
445.
*5*
0.
0.
0.
0.
0.
*6*
2625.
22.
331.
2851 30.
338.
*7*
0.
0.
0.
0.
0.
*8*
3775.
10.
313.
220115.
394.
*9*
0.
o.
0.
0.
o.
0.
0.
0.
0.
0.
S.O.
202131.
98413.
15088.
10506.
2234.
S.O.
4358529.
911433.
133645.
124298.
17017.
NUMBER
13.
98.
108.
316.
32 Y.
NUMBER
32.
195.
212.
251.
172.
*11*
7048.
1337.
2731.
101049.
1291.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SO
*1*
O.
0.
0.
0.
o.
*2*
0.
0 .
0.
0.
0 .
*3*
0.
0.
0 .
C-.
r.
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS
-------
, * NATIONAL TOTALS *
M.OW OF MOST EFFICIENT WATER USE REGION USED THROUGHOUT
1968 FLM CTNDI THINS ( 1967 DOLLARS)
SIC CODF... 28
T0TU NUW36P OF MANUFACTURING PLANTS... 1421
MANUFACTURING
TOT«. CMMTU COST
TOTAL AN WAI OEM COST
TOTAL ANNUAL COST
MAXIMUM
28600,
MINIMU*
1C231C84.
IOOQ364.
230B7U.
4.
6856.
588.
1459.
WERAGF
550.
326.
3149f)5.
22673.
6268?.
TOTAL
781889.
462860.
447593984.
322 18032.
89071824.
S.D.
1398.
1067.
588911.
50914.
122604.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
32218032.
2P379696.
34464704.
TOTAL
89062432.
COST RANGE
> 500000.
100000. Tf 500000.
50000. TO 100000.
10000. TO 50000.
ft. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
5000CO. TO 1000000.
100000. TO 500000.
0. TO 100000.
*2*
DISTRIBUTION OF npFRATION
!»f\X!MUM MINIMUM
1009364. 621243.
480862. 104451.
99291. 50568.
495C6. 10066.
9998. r»88.
AND MAINTENANCE COST
4VF.FUGE
786895 .
188278.
70177.
21200.
53«2.
f-AXIMUM
12788855.
3643426.
998619.
499952.
99206.
') ISTR I8UTION OF INVESTMENT REQUi REMF.NTS
5538211 .
IC04710.
50070r .
100435.
8570.
AVERAGE
9485862.
1726787.
689000,
232490.
61733.
DISTRIBUTION OF TOTAL CAPITA!. CCST FCR TRfcAlMENT !$ 1000 »
*5*
*6*
TOTM
2360684.
6966293.
631591?.
12911103.
3670469.
TOTU.
47429312 .
t 89946576.
120575008.
179482352,
22162176.
*10*
S.D.
200203.
97999.
1 4 1 « 2 .
97 ?9.
2 '-67.
S.LU
25919^1,
650913-
139349.
NUMBtP
"J
3 .' .
90,.
609.
68? -
; ; >; •' '•• '
I' ( -
i ^>
MAX
HIM
SVE
TOT
SO
3034.
0.
50.
19262.
229.
627 .
I .
20.
24545.
41.
1682.
17.
122.
149281 .
134.
1998.
0 =
34.
48178.
108.
217.
0.
22.
13933.
22.
2179.
0.
228.
69660.
211.
6f.
0,
31 ,
3339.
7.
2736,,
0.
145.
118937.
21R.
23.
0.
5.
519.
4.
C.
0.
0.
0.
0.
0 .,
0,
0.
0 .
0.
0
(!
0
C
o
*2*
*3*
DISTRIBUTION OF ANN'"At 0£« TREATMENT COSTS <* '0001
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVF
TOT
SO
137.
0.
5.
1791.
11.
9.
0.
t .
934.
1.
414.
0.
it.
13121.
23.
102.
0.
2.
3414.
6.
370.
0.
10.
6483.
25.
203.
0.
11.
3221.
16.
8 .
0.
2.
163.
I.
122 .
0.
4,
2993.
7.
8
0
1
104
1
*10*
0.
0.
0.
0.
0.
* 11 *
C,
0.
0.
0.
0 „
0,
0.
0.
0,
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIOhAL TOTALS *
FLOW OF MOST EFFICIENT WATER USE RtGICN USED THROUGHOUT
1968 FLOW CONDITIONS < 1967 DOLLARS)
SIC CODE... 29
TOTAL NUMBER OF MANUFACTURING PLANTS... 334
00
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOT4L CAPITAL COST
TOTAL ANNUAL 06M COST
TOTAL ANNUAL COST
COST RANGF
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
4VP
TOT
SO
6234.
5.
106.
35293.
433.
*2*
195,
0,
12.
3923.
20.
MAXIMUM
10000.
8691.
19815616.
830417.
3346999.
OEM
15188391.
CIST*
KHXIMUM
830417.
402257.
99188.
49204.
9914.
MINIMUM
27.
2.
17991.
925.
3276.
ANNUAL COST OF WASTE
REPLACEMENT
14418495.
AVERAGE
381.
289.
863383.
45474.
155123.
TREATMENT
INTEREST
22204464.
TOTAL
127318,
96377.
288369920.
15188391.
51811216.
TOTAL
51811344.
IBUTION OF OPERATION AND MAINTENANCE COST
MINIMUM
579926.
101520.
50653.
10(03.
925.
HVERUGE
705172.
209292.
68252.
24873.
4121.
TOTAL
141 0343 .
6488055.
3412618.
3407634 .
469819.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
2476S520.
4928766.
986310.
494729.'
98731.
DISTRIBUTION
*3* *4*
1211. 382.
5. 0.
105. 13.
35083. 4290.
138. 33.
MINIMUM
5372740.
101 1053.
512018.
101063.
22488.
OF TOTAL CAPITAL CCST
#5* *6*
18. 0.
0. 0.
6. 0.
582. 0.
2. 0.
AVERAGE
9576118.
1863630.
724683.
314777.
56214.
FOR TREATMENT t $ 1000
*7* *8*
0. 86.
0. 0.
) . 17 .
0. 1753.
0. 11.
TOTAL
134065664.
149090400.
45655008.
26441232.
5227905.
1
*9* *10*
0 . 0 .
0. 0.
0. 0.
0. 0.
0. 0.
s.o.
8T6.
764.
1775938.
83800.
308756,
S.D.
177126.
99606.
14749.
L 1 L 30 .
2512.
S.O.
5261964.
903787.
146808.
104040.
18338.
Ml* *12*
0. 11793.
0. 125.
0. 898.
0. 207455.
0. 1347.
NUMBER
2.
31.
50.
137.
li^.
NUMBER
14.
80.
63.
84.
93.
*l*
*2*
*3*
MAX
MIN
AVE
TOT
SO
208.
0.
11.
3587.
21.
4.
0 .
I.
214.
0 .
191 .
0.
9.
2877.
18.
25.
0.
I.
362.
2.
7.
0.
1 .
92.
1.
t .
0.
0.
0.
0.
DISTRIBUTION OF ANNIAL 06M TREATMENT COSTS <$ 1000)
o.
0.
0.
o".
3 ,
0.
1.
90 ,
0.
*9*
0.
0 .
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
'•" o.
0,
o.
*L2*
403.
4.
34.
7966.
48.
THE_,OATA Bjt STRIBUTICN USEO IJ HIGHLY
-------
* NATIONAL TOTALS *
FLOW OF MOST EFFICIENT WATER USE REGION USED THROUGHOUT
1968 FLCM CONDITIONS ( 1967 DOLLARS)
SIC CODE... 30
TOTU NUMBER OF MANUFACTURING PLANTS... 459
MANUFACTURING EMPLOYMENT
FLOW (MGYI
TOTU CUP ITU COST
TOTAL ANNUAL 06M COST
TOTAL ANNUAL COST
MAXIMUM
20000.
677.
798516.
69186.
170598.
MINIMUM
45.
2.
16692.
755.
2875.
AVERAGE
663.
26.
78628.
3975.
13961.
TOTAL
304302.
12087.
36090400.
1824372.
6408067.
S.O.
1295.
56.
63530.
4780.
12779.
OEM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1824372.
1804519.
277895S.
TOTAL
6407850.
COST RANGF
> 500000.
tOOCOO. TO
50000. TO
I 0000. TO
0. TO
500000.
100000.
50000.
I 0000.
DISTRIBUTION OF OPERATION
M&XIMUM MINIMUM
0. 0.
0. 0.
6S186. 69186.
37897. 1029.?.
9962. 755.
AND MAINTENANCE COST
4VERHGE
0.
0.
69186.
16806.
3240.
TOTHL
0.
0.
69186.
336127.
1419116.
S.D.
0.
0.
0.
8809.
1663.
NUMBER
0.
0.
1.
20.
438.
CO
COST RANGE
> 50000OO.
1000000. TO 5000000.
500000. TO 1000000.
nOOOO. TO 500000.
0. Tn 100000.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
0.
998144.
423084.
99593.
,1 IN IMUM
AVERAGE
0.
0.
538946.
100188.
?0865.
0.
0.
692523.
159325.
f>7690.
TOT4L
0.
0.
2770092.
20074944.
22270016.
S.O.
0.
0.
207112.
62274.
16083.
NUMBER
0.
0.
4.
126.
329.
DISTRIBUTION OF TOTAL CAPITAL CCST 1-CR TREATMENT ($ 1000)
MAX
MIN
*VF
TOT
SO
0.
0.
0.
0.
n.
*2*
52 .
0.
3.
1503 .
4.
*3*
125.
3.
13.
6068.
10.
65.
0,
2..
913.
4.
*5*
0.
0.
0.
o.
*6*
333.
9.
40.
18483.
28.
*7*
0,
0.
0.
f).
0.
*8*
224.
4.
20.
9127.
18.
*9*
0.
0.
0 .
0.
*io*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
AVF
TOT
SO
0.
0.
c.
0.
0.
*2*
2.
0 .
0 ,
20".
0 ,
12.
0 .
I .
230.
1 .
DISTRIBUTION OF ANNJAL 06M TREATMENT COSTS (t 1000)
*/t* *5* *6* *7* *8*
0.
0.
144.
I.
0.
o.
0.
0.
37.
0.
2.
791.
3.
0.
0.
0 .
0 .
0.
9 ,
0.
1.
451 ,
I ,
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE OAT4 OISTR[8UT!CN USED IS HIGHLY SKEWED.
-------
SIC CODE... 31
TOTAL NUMBER OF MANU F^TUR ING PLANTS.
* NATrONAI. fOTALS *
i-LOW OF MOST EFFICIENT WATER USE RtGICNUSfO THROUGHOUT
1968 FLOW CONDITIONS ( L967 DOLLARS!
215
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL C4PITM COST
TOTAL ANMJAt 0£M COST
TOTAL ANNUAL COST
MUM
3700.
1570.
1967162.
97106.
346936.
MINIMUM
60.
5.
11252.
760.
2228.
IVtfUGE
476.
. 107,
250912.
10874.
42741.
TO'A
102307.
22941.
C3946>.28.
2337973.
9189282.
S.O.
50».
162.
2^6882.
.2277.
ANNUAL COST OF WASTE TREATMENT
REPHCEMEN1 INTEREST
23 r7973.
2697306.
4153849.
TOTAL
9189128.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
t\3
O
1 00000.
50000.
10000.
0.
CTI«T D At
TO
TO
TO
TO
^fie
500000
100000
50000
i 0000
> 5000000.
.000000. TO 5000000.
500000. TO ICOOOOO.
100000. TP 500000.
0. TO 100000.
MAX
WIN
4V E
TOT
SO
*;?*
i XIMUM
0.
0.
97106.
49154.
9993.
MAXIMUM
0.
2458952.
931947.
4927C9.
91345.
MINIMUM
0.
0.
56573 .
1 0088.
760 .
DISTRIBUTION OF
MIN IMUM
0.
1002204.
503630 .
101384.
14066.
4VER&GE
0.
0.
74024.
18485.
3585.
INVESTMENT REQUIREMENTS
AVERAGE
0.
1311225.
680609.
332635.
25237.
TOT&L
0.
0.
222072.
1682138.
433821.
TOTAL
0.
13112251 .
25182528.
26943472.
2195646.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT (* 10OOI
*3*
*4*
*5*
0.
0.
0.
0.
0.
213 .
la.
45.
4902.
28.
843.
107.
226.
24862.
111.
428.
17.
57.
6278.
53.
53
0
10
1026
9
*6*
0.
0 .
0.
0.
0.
*r*
o.
0.
0.
0.
0.
*8*
483.
7.
79.
16880.
72.
*g#
0.
0.
n.
o.
0.
*10*
0.
0.
0.
0.
0.
*11*
0 .
0.
0.
0.
0.
S.O.
0.
0.
?C8<-5
8433.
3321.
S.D.
0.
451655.
132964.
1C79-50.
18808.
NUMBER
0.
0.
3.
91.
IZ1 .
NUMBEK
0.
10.
37.
SI.
87.
0.
0.
0.
0.
0.
MAX
MIN
TOT
SO
*1*
*2*
*3*
DISTRI8UTION OF ANNUAL Q6M TREATMENT COSTS (* 10001
*5* *6* *7* *8* *9*.
n.
0.
0.
0.
0.
3.
1 .
I .
11?.
°.%
68.
3.
It .
1202.
19.
16.
1.
3.
280.
2.
55
0
3
347
7
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
13.
0.
2.
393 .
Z.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*u*
0.
0.
o.
0.
0.
*IZ*
0.
0.
0.
0.
0,
(1R S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USLD IS HIGHLY SKEWED.
-------
* NAT IONAL TOTALS *
FLOW DF MOST EFFICIENT WATER USE REGION USED THROUGHOUT
1968 FLOW CONDITIONS < 1967 DOLLARS)
SIC CODE,..32
TOTAL NUMBER OF M4NUF\CTUP ING PLANTS... 945
MANUFACTURING EMPLOYMFNT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAl OEM COST
TOTAL ANNUAL COST
MAXIMUM
8000.
1977.
911219.
I49943.
258198.
MINIMUM
50.
2.
10815.
302.
1683.
GE
345.
61.
76812.
6486.
16242.
TOTAL
325708.
57805.
72587520.
6129474.
15348801.
S.O.
586.
141.
85596.
11833.
22554.
ANNUAl COST OF WASTE TREATMENT
to
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
000000. TO
500000. TO
100000. TO
*l*
500000.
100000.
50000.
1 0000.
OEM
6129474.
DISTR
MAXIMUM
0.
149943.
96712.
48249.
9759.
REPHCEMENT
3629375.
IBUTION OF 1PERATION AND
MINIMUM
0.
103769.
50755 .
10033.
302.
INTEREST
5589236.
MAINTENANCE CCST
AVER1GE
n .
132062.
66744.
20441.
3597.
TOTAL
15348C85
TOTAL
0.
396185.
734187.
2003242.
2995935.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
000000 .
000000.
500000.
100000.
PAXIMUM
0.
1139023.
983536.
483650.
99978.
MINIMUM
0.
1009300.
501116.
100123.
13519.
AVERAGE
0.
1074161.
622447.
171387.
57558.
TOTAL
0.
2148322.
9336709.
38904880.
40347856.
*2*
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT {$ 1000)
#3* *4# *5* *6* *7* *8* *9*
*10*
*l*
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS <$ 1000)
*4* *5* *** *7* *8* *9*
*10*
S.D.
0.
24786.
14344.
10771.
2208.
S.D.
0.
91732.
137726.
88446.
22923.
NUMBER
0.
3.
11.
98.
833.
NUMBER
0.
2.
15.
227.
701.
*H*
*12*
MAX
MIN
AVE
TOT
SO
0.
0.
0.
0.
0.
0 .
0.
0.
0 .
0.
636.
10.
61.
58114.
61.
275.
0.
9.
8369.
20.
0.
n .
0.
0.
0.
191.
9.
33.
61 04.
28.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
n.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*lt*
*12*
MAX
MIN
AVE
TOT
SO
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
121.
0.
5.
4771.
9.
29.
0.
I.
1100.
2.
0.
0.
0.
0.
0.
16.
0.
I.
258.
2.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW Of MOST EFFICIENT WATER USE REGION US6D THROUGHOUT
1968 FLOW CONDITIONS ( 1967 DOLLARS)
SIC CODE... 33 •»
TOTM. NUMBER OF M»NUFHCTUR ING PLANTS... 1137
MANUFACTURING EMPLOYMENT
FLOW (MGY»
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOTAL ANNUAL COST
MAXIMUM
28000.
15032.
9170167.
U89581.
2354217.
MINIMUM
10.
2.
13073.
575.
2267.
AVERAGE
902.
293.
262558.
29656.
63008.
TOTAL
1025720.
332666.
298528256.
3371918*.
T1640288.
S.O.
2033.
1062.
706916.
96783.
184148.
06M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
33719184.
14926411.
22986656.
TOTAL
71632240.
ro
COST RANGE
> 500000.
I00000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
1189581.
489468.
96012.
49479.
9721.
PAXI MUM
U462958.
4976046.
989883.
498118.
99986.
MINIMUM
508166.
10 1885.
50167.
10009.
575.
WERAGE
723789.
215329.
69210.
27243.
2561.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5128032. 7858438.
1004765. 2203410.
505002. 662200.
102005. 243357.
16341. 49247.
TOT4L
10133052.
12489085.
4291047.
4685810.
2128171.
TOTAL
55009072.
182883056.
40394192.
58162256.
36787456.
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TREATMENT ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
4VE
TOT
SO
4301 .
5.
138.
47173.
412.
538.
1.
18.
19659 .
50.
2210.
9.
133.
121755.
247.
1469
0
31
35055
110
0.
0.
0.
0.
0.
457.
0.
29.
20648.
32.
O.
0.
0.
0.
0.
652.
27.
116.
23455.
117.
0.
0.
0.
0.
0.
*10*
3288.
0.
1468.
30825.
718.
S.D.
201041.
104839.
13976.
11183.
1801.
S.D.
1977708.
1125410.
127163.
115436.
18909.
NUMBER
14.
58.
62.
172.
831.
NUMBER
7.
83.
61.
239.
747.
*11*
0.
0.
c.
0.
0.
*12*
0.
0.
0.
0.
0.
*2*
*3*
DISTRIBUTION OF ANNIfAL 0£M TREATMENT COSTS ($ IOOOJ
*7* *8* *9*
MAX
MIN
AVE
TOT
SO
267.
0.
20.
6825.
38.
14.
0.
I.
971.
1 .
738.
0.
22.
20040.
65.
138.
O.
3.
3976.
11.
3.
0.
0.
0.
0.
6?.
, 0.
* I.
876.
3.
0.
0.
0.
0.
0.
32.
1 .
5.
965.
5.
0.
0.
0.
0.
0.
*10*
6.
0.
3.
69.
1.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTICN USED IS HIGHLY SKEWED.
-------
sic
TOT*t
3*
OF
• •-..-•• . * "rT IONAL ifOfALS *'..-
OF MOST EFFICIENT WATER ;4JSE REGION USED ^THROUGHOUT
19*8 FL3W CONDITIONS ( 1967 00LLARS*'
'. • •
. 103?
MAXIMUM:
MANUFACTURING EMPLOYMENT 14000.
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OCM COST
TOTAL ANNUAL COST
1338.
902480.
134477.
236391.
MINIMUM
54.
2.
10321.
506.
1817.
4VER4GE
565.
50.
77864.
6449.
15703.
TOTAL
586016.
52038.
75559456.
6687613.
16284474.
S.O.
875.
88.
64112.
8944.
16999.
ANNUAL COST OF WASTE TREATMENT
COST RANGE
> 500000.
106000. TO 500000.
50000. TT> 100000.
10000. TP 50000.
,0, TO 1 0000.
*»
CO
W COST RANGE
> 5000000.
1000000. TO 5000000.
50 00 CO. TO 1000000.
100000. TO 500000.
0. TO 100000.
*l* *2*
MAX o. 77.
MIN 0. 1.
AVF 0. 6.
TOT 0. 6054.
SO 0. 6.
OGM
6687613.
OISTR
CAXIMUM
0.
134477.
77790.
448C4.
9945.
MAXIMUM
0.
1003100.
828484.
479168.
99845.
DISTRIBUTION
* 3* *4*
497. 214.
9. 0.
57. • B.
5958?. 8513.
43. 14.
REPLACEMENT
3777972.
INTEREST
5818075.
TOTAL
16283660.
IBUTION OF OPERATION AND MAINTENANCE COST
MINIMUM
0.
105810.
50071.
10104.
506.
DISTRIBUTION OF INVESTMENT
MINIMUM
0. ..
1003100.
503909.
100603.
12901.
OF TOTAL CAPITAL CCST FCR
*5* *6* *7
0. 0.
0 .
0. 0.
o. o.
0. 0.
AVERAGE
0.
120143.
62175.
16615.
435?. *
REQUIREMENTS
AVERAGE
0.
1003100.
624040.
155384.
61844.
TREATMENT {$ 1000)
* *8* *g*
0. 0. 14
0. 0. 0
0 . 0 . I
0. 0. 1410
0. 0. 1
TOTAL
0.
240286.
559576.
1927382.
3960450.
TOTAL
0.
1003100.
4992316.
41332176.
47125408.
,.' :*io*
0.
. -0.
0.
0.
0.
S.O.
0.
20271.
9979.
7953.
2252.
S.D.
0.
0.
111623.
69712.
23572.
*11* *12*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
NUMBER
0.
2.
9.
116.
910.
NUMBER
0.
t.
8.
266.
762.
*1*
*3*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS «$ 1000)
*8* *9*
*10*
*ll*
*12*
MAX
MIM
AVE
TOT
SO
0.
0.
0.
0.
0.
3.
0.
i .
607.
n .
^8.
0.
4.
4578.
A«
27.
0.
I.
1216.
2.
0.
D.
0.
0.
n.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
0.
0 .
0 .
0.
0.
0.
6.
0.
0.
286.
t\
- •
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTR£BUTICN USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW OF HOST EFFICIENT WATER USE REGICN USED THROUGHOUT
1968 FLTW CONDITIONS ( 1967 DOLLARS)
TPT4L NUMBER OF MANUFACTURING PLANTS... 790
MANUFACTURING EMPLOYMENT
FLOW (MGV)
TOTAL CAP ITU COST
TOTAL ANNUAL CtM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
I00000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO '•COOOOO.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*l*
MAX
MIN
AVE
TOT
SD
MAXI MUM
36000.
1116.
780710.
93136.
192286.
06M
3724365.
OISTR
MAXIMUM
0.
0.
93136.
48061.
9932.
MINIMUM
S.
0.
1489.
19.
209.
ANNUAL COST OF WASTE
REPLACEMENT
2232794.
IBUT ION OF TPERATION
MINIMUM
0.
0.
52704.
10002.
19.
*"'*
HVERAGE
1260.
35.
565?6.
4714.
11194.
TREATMENT
INTEREST
3438501.
AND MAINTENANCE CCST
AVERAGE
0.
0.
74100.
16353.
3288.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
H* xi MUM
0.
0.
975888.
466804.
99754.
MINIMUM
0.
0.
5? 9561.
100261.
1861.
AVERAGE
0.
0.
72S561.
157625.
't8T94.
TOTAL
995341.
27970.
44655888.
3724365.
9396240.
TOTAL
9395660.
TOTAL
0.
0.
222300.
1144701.
2357462.
TOTAL
0.
0.
2135683.
22067520.
31569696.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT {$ 10001
*3* *4* *5* *6* *7* *fi* *9*
0.
0.
0.
0.
0.
75.
c.
4.
3471.
5.
493.
I.
45.
35785.
37.
199
0
6
4572
11
0.
0.
0.
0.
0.
0.
Q.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
14.
0.
t.
829.
1 .
*10*
0.
0.
0.
0.
0.
S.O.
2275.
69.
54412.
6535.
13402.
S.D.
0.
0.
20319.
7867.
2118.
S.O.
0.
0.
227055.
65734.
2C802.
NUMBER
0.
0.
3.
70.
717.
NUMBER
0.
0.
3.
140.
647.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVF
TOT
SO
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TRE»THENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
2 .
0.
1 .
404.
0.
68 .
0.
3.
2505.
5.
19.
0.
1.
660.
I.
0.
r).
0.
o.
0.
o.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
4.
0.
0.
155.
0.
*10*
0.
0.
0.
0.
0.
*n*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED JS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW OF MOST EFFICIENT WATER USE REGION USED THROUGHOUT
196R FlOW CONDITIONS ( 1967 DOLLARS)
STC CODf... 36
TOTAL NUMBER OF MANUFACTURING PLANTS... 817
MANUFACTURING EMPLOYMENT
FlOW (MGV)
TOTAL CAPITAL COST
TOTM. ANNUM PCM COST
TOTAL ANNUAl COST
MAX I MUM
22800.
2C82.
1058221.
182998.
317392.
MINIMUM
f. o.
4.
15421.
8VO.
2804.
AVERAGE
1535.
64.
84645.
7629.
18380.
TOTAL
1254103.
52063.
69154864.
6232842.
15016065.
S.D.
2272.
124.
80080.
11620.
21664.
ANNUAL COST OF WASTE
06M REPLACEMENT
6232842. 3457742.
TREATMENT
INTEREST
532492 1.
TOTHL
15015505.
DISTRIBUTION OF OPERATICN AKD MAINTENANCE COST
COST RANGE
> 500000.
KN
W1
100000.
50000.
10000.
0.
trtf-r ft «t
Tn
TO
TO
TO
t f e-
500000
I 00000
50000
10000
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAXIMUM
0.
182198.
70406.
49464.
9924.
MINIMUM
o.
150182.
10064.
840.
AVERAGF
0.
166590.
59763.
18102.
4430.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0
1322776.
642345.
4932 S3.
99727.
MINIMUM
0.
I 120940.
506674.
100019.
19276.
AVERAGE
0.
1221858.
556910.
167810.
63423.
MAX
MIN
AVF
TOT
SD
*1*
DISTRIBUTION OF TOTAL C\PIT\L COST FOR TREUfMENT (* 1000)
TOTAL
0.
333181.
537864.
2371297.
2990566.
TOTAL
0.
2443716.
5012188.
44805200.
34184944.
*2*
*3*
*4*
0.
0.
0.
0.
r .
10?.
i .
7.
5658.
8 .
623.
14.
66.
53704.
52.
315
1
10
8503
19
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*7*
0.
•%
0.
0.
0.
*8*
0.
0.
0.
0 .
0.
*9*
18.
0.
2.
1290 ,
L .
*10*
0.
0.
0.
0.
0.
S .0.
0.
23205.
7867.
8766.
2076.
S.O.
0.
142715.
48586.
78012.
19312.
NUMBER
0.
2.
<».
131.
675.
NUMBER
0.
2.
9.
?67.
539.
*ll*
e.
o.
o.
0.
0.
*12*
0.
0.
0.
o.
o.
MAX
MIN
AVE
TOT
SO
*3*
DISTRIBUTION OF ANNUAL OGM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
4 .
0.
1 .
50? .
0.
133.
0.
5.
4309.
8.
37.
0.
1.
1152.
2.
0.
0.
0.
c..
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0 .
9.
0.
0.
271.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0 .
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.O. REPRESENTS STANDARD OEVIHTION. THE OVT4 DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW CF MOST EFFICIENT WATER USE REGION USED THROUGHOUT
1968 FLOW CONDITIONS ( 1967 DCLIARS)
SIC CODE.. . 37
T3TAL NUMBER OF MANUFACTURING PI ANTS... 562
CO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUM 06M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAXIMUM
38000.
IC75.
684366.
110910.
197824.
06M
4766777.
y
MINIMUM
150.
2.
10959.
660.
2052.
ANNUAL COST OF WASTE
REPLACEMENT
2429738.
DISTRIBUTION OF OPERATICN
MAXIMUM
0.
110910.
77642.
4S53S.
9689.
MINIMUM
1 .
110910.
50084.
10117.
660.
AVERAGE
1923.
69.
86468.
8482.
19464.
TREATMENT
INTEREST
3741795.
AND MAINTENANCE CCST
AVFRAGE
0 .
110910.
63698.
20938.
4044.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
0.
0.
855457.
482489.
99403.
MINIMUM
0 .
<§» o.
524259.
100145.
i y. 99 .
AVERAGE
0.
D.
648319.
194547.
57019.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT 1$ 1000)
TOTAL
1080478.
38761.
48594768.
4766777.
10938714.
TOT4L
10938310.
TOTAL
0.
1L0910.
636978.
2219415.
1799562.
TOTAL
0.
0.
5834875.
33072992.
21838096.
*2*
*3*
*4*
MHX
MIN
AVE
TOT
SO
0.
0.
0.
0.
0.
66.
1 .
7.
4024.
8.
434.
10.
66.
37357.
58.
173
0
11
6309
19
*5*
0.
0.
(! .
0.
0.
*6*
0.
0.
0.
0.
0.
*7*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*9*
12.
0.
2.
905.
2.
*10*
0.
0.
0.
0.
0.
S.D.
3843.
IL7.
86873.
11857.
22821.
S.D.
0.
0.
8405.
9716.
2197.
S.O.
0.
0.
102208.
92909.
21490.
NUMBER
0.
1.
10.
106.
445.
NUMBER
0.
0.
9.
1 70.
383.
*U*
o.
0 .
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*2*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS It 1000)
*6* *7* *8*
('-.
0.
0.
0.
6.
3 .
0.
1 .
365.
0.
80.
0.
6.
3306.
°-
22.
0.
2.
887 .
?.
0.
0.
0.
0.
0.
0.
, 0 .
0.
0.
o.
0.
0.
0.
J m
0.
0.
0.
0.
0.
0.
5.
0.
0.
209.
I .
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
OR S.O. REPRESENTS STANOAPO DEVIATION. THE D4TA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NMIONM. TOT4LS *
FLOW OF LEAST EFFICIENT WATER USE REGION MODIFIED
1168 FLOW CONDITIONS ( 1967 DOLLARS)
SIC CODE... 20
TOT At NUMBgfc OF HANUFACTURIN6 PLANTS ... 4494
MANUFACTURING EMPLOYMENT
Ft OH (MGY)
TOTAt CAP IT At COST
TOTAt ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
5500.
81468.
39821440.
3125120.
8182441.
OEM
57566160.
MINIMUM
3.
1.
1686C.
669.
2874.
4NNUHL COST OF WSSTE
REPLACEMENT
49828576.
AVERAGE
206.
189.
221756.
12810.
40978.
TREATMENT
INTEREST
76735968.
TOTAt
924045.
850652.
996571648.
57566160.
184156208.
TOTAt
184130704.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RM4GE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
tO
"^ COST RANGE
> 5000000.
1 000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TC 100000.
*1* *2*
MAX 0. 4064.
MIN 0. 0.
WE 0. 25.
TOT 0. 65404 .
SO 0. 106.
M XI MUM
3125120.
437336.
99476.
49174.
9997.
MINIMUM
50S459.
133672.
50012.
10004.
669.
AVERAGE
9667 U.
181044.
68571 .
19595.
4212.
TOTAL
7733691.
10138439.
6514255.
19026320.
14169097.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
HAXIfUM
497768CO.
4843651.
999361.
499217.
99979.
DISTRIBUTION
*3* *4*
275. 21509.
0. 0.
34. 128.
40305. 92755.
24. R8t.'
MINIMUM
5560183.
1005192.
503597.
100093.
?1075.
OF TOTAL CAPITAL CCST
*">* *6*
87. 82C9.
8. 0.
20. 156.
14226. 402465.
13. 286.
4VERSGE
11727417.
1851354.
673671.
211695.
64104.
FOR TREATMENT ( $ 1000
*7* *8*
0. 6039.
0 . 5.
0. 84.
0. 377526.
0. 156.
TOT&L
164183840.
292514048.
182564896.
497694976.
108977648.
)
*9* *10*
43. 0.
1. 0.
5. 0.
3787. 0.
5. 0.
S.O.
325.
1363.
773126.
58533.
156477.
S.D.
885569.
77098.
14187.
9416.
2384.
S.D.
11387870.
890134.
139304.
99339.
21268.
NUMBER
8.
56.
95.
971.
3364.
NUMBER
14.
158.
271.
2351.
1700.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
M&X
MIN
TOT
so
*1*
*2*
DISTRIBUTION OF ANNUAL 06M TRE»TMENT COSTS ($ 10001
*5* *fc* *7* * 8*
0.
0.
0.
0 .
0.
50.
0 .
I .
?237.
1 .
37.
0 .
2.
2364.
^.
695.
0.
6.
4703.
30.
82.
1.
6.
4592.
9.
2045.
0.
12.
30711.
51.
0 .
0.
0.
0.
0.
335.
0.
3.
12161 .
6.
17.
0.
1.
797.
2 .
*10*
0.
0.
0.
0.
0.
*u*
0.
0 .
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE...
TOTAL NUMBER
22
* NHT10NM. TOTALS *
FLOW OF LEAST EFFICIENT WATER USE REGION MODIFIED
1968 FLOW CONDITIONS < 1967 DOLLARS)
OF MANUFACTURING PLANTS... 1021
MANUFACTURING EMPLOYCFNT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL 4NNUH COST
MAXIMUM
9000.
16013S7.
I 10565.
275S61.
MINIMUM
35.
16.
5157S.
1815.
8395.
AVERAGE
537.
21 I.
245159.
11056.
42188.
TOTAL
548467.
215032.
250306960.
11288486.
43073536.
S.D.
602.
267.
171359.
9602.
30853.
06M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
I 1288486.
12515347.
19273616.
TOTAL
43077440.
JN3
as
COST RANGE
> 500000.
100000. TO
50000. TO
I 0000. TO
0. TO
DISTRIBUTION,OF OPERATION AND MAINTENANCE CCST
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
I 000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO t00000.
MAX
&VF
TOT
so
*1*
*2*
K&XIMUM
0.
11 0565.
81627.
49678.
9996.
MAXIMUM
0.
2001731.
993253.
496954.
99842.
MINIMUM
0.
110565.
50933.
10011 .
1815.
4VER4GE
0.
110565.
66693.
17674.
6069.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1023608.
500009.
100633.
64473.
HVER&GE
0.
1294170.
644197.
251086.
34338.
TOTAL
0.
110565.
533547.
6857494.
3786954.
TOT4L
0.
23295072.
72794272.
213423472.
3373509.
DISTRIBUTION OF TOTAL CAPITAL CCST FCR TREATMENT ($ 10001
*3*
0.
0.
0.
0.
0.
50.
0.
6 .
3431 .
6.
231.
0.
40.
22241 .
29.
225
0
10
9267
17
*5*
0.
0.
0.
0.
D.
771.
26.
139.
126876.
95.
*7*
0.
0.
0.
0.
0.
*8*
605.
15.
87.
88484.
66.
*g*
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
S.D.
0.
0.
11418.
7774.
2030.
S.D.
0.
295490.
122533.
100656.
11305.
NUMBE R
0.
1.
8.
388.
624.
NUMBER
0.
18.
113.
850.
40.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
A ve
TOT
SO
*2*
*3*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS (t 1000)
*5* *fc* *7* *8* *9*
0.
0.
0.
0.
0.
1 .
0 .
0.
263.
0 .
18.
0.
2.
1048.
2.
9.
0.
1.
770.
I.
0.
0.
0.
0.
0.
83.
1 .
7.
6741.
7.
0.
0.
0.
0.
0.
19.
1.
2.
2466.
2.
0.
0.
0.
0.
0.
MO*
0.
0.
0.
0.
0.
0.
0 .
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW OF LEAST EFFICIENT WATER USE REGION MODIFIED
1968 FLOW CONDITIONS ( 1967 OOLLARSI
SIC CODE... 24
TOTAL NUMBER OF MANUFACTURING PLANTS... 405
to
CO
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
I0000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
0.
0.
0.
0.
0.
*2*
0.
0.
0.
0.
0.
MAXIMUM
14500.
7138.
2908433.
235249.
604620.
0£M
8735520.
DISTR
MAXIMUM
0.
235249.
99660.
49752.
9970.
MINIMUM
75.
28.
80532.
2150.
12530.
ANNUAL COST OF WASTE
REPLACEMENT
8397871.
AVERAGE
369.
402.
414710.
21569.
74235.
TREATMENT
INTEREST
12932716.
TOTAL
149384.
162984.
167957440.
8735520.
30064992.
TOTAL
30066080
IBUTION OF OPERATION AND MAINTENANCE CCST
MINIMUM
0.
131716.
52516.
10110.
2150 .
AVERAGE
0.
142565.
73360.
23639.
5883.
TOTAL
0.
855393.
1613929.
5389653.
876603.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
PAX! MUM
0.
3635541.
993925.
499478.
0.
DISTRIBUTION
*3* 44*
0. 752.
0. 3.
0. 48.
0. 19281.
0. 68.
MINIMUM
i).
1001374.
500534.
100665.
0.
OF TOTAL CAPITAL CCST
*5* *6*
0. 1084.
0. *8.
0. 2C7.
0. 83750.
3. 139.
AVERAGE
0.
1527984.
683501 .
283388.
0.
FCR TREATMENT < t 1000
*7* *8*
0. 1073.
0. 29.
0. 160.
0. 64923.
0 . 1 28 .
TOTAL
0.
53479472.
88171680.
68296576.
0.
*9* *10*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
S.O.
774.
587.
330944.
23730.
65620.
0.
0.
0.
0.
0.
S.D.
0.
49325.
16953.
10326.
2025.
S.D.
0.
570110.
141278.
112388.
0,
NUMBER
0.
6.
22.
228.
149.
NUMBER
0.
35.
129.
241.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SO
*1*
0.
0.
0.
0.
0.
*2*
0.
0.
0.
0.
0.
*3*
0.
0.
0.
0.
0.
DISTRIBUTION OF ANNUAL 0£M TREATMENT COSTS (* 1000»
*7* *8* *9*
49.
0.
4.
1514.
5.
0.
0.
0.
0.
n.
145.
1 .
13.
5359.
15.
0.
0.
0.
0.
0.
41.
1.
5.
1863.
4.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* NATIONAL TOTALS *
FLOW OF LEAST EFFICIENT WATER USE REGION MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 862
MANUFACTURING EMPLOYMENT
FLOW (MGY»
TOTAL CAPITAL COST
TOTAL ANNUAL QCM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
I0000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SO
*l*
0.
0.
0.
0.
0.
*2*
0.
0,
o.
0,
0.
MAXIMUM
4000.
IC7829.
45535856.
3382589.
9129232.
MINIMUM
12.
8.
2580*.
898.
4190.
AVERAGE
447.
3366.
1749198.
126939.
349047.
TOTAL
385511.
2901844.
1507809024.
109421504.
300878592.
S.D.
540.
9366.
4307206.
309160.
851018.
ANNUAL COST OF WASTE TREATMENT
OEM
109421504.
REPLACEMENT
75390432.
INTEREST
116101232.
TOTAL
300913152.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
3382589.
492097.
9<3528.
49615.
9957.
MAXIMUM
56919808.
4989713.
997063.
493215.
99799.
DISTRIBUTION
3* *4*
0. 18877.
0. 1.
0. 543.
0. 362563.
0. 1743.
MINIMUM
501852.
100759 .
50052.
10121.
898.
DISTRIBUTION OF INVESTMENT
MINIMUM
5027460.
1008279.
513131 .
100205.
32254.
OF TOTAL CAPITAL COST FOR
*5* *6* *7
0. 5454.
0. 25.
0. 561.
0. 483747.
0. 680.
AVERAGE
1124306.
211831.
71008 .
26695.
5262.
REQUIREMENTS
AVERAGE
16349176.
2161293.
755668.
223319.
77295.
TREATMENT (* 1000!
* *8*
0. 7839.
0. 12.
0. 606.
0. 425908.
0. 933.
TOTAL
56215328.
34740304.
10225170.
6967476.
1278696.
TOTAL
1062696448.
644065536.
111838896.
59849456.
641 5444.
*9* *10*
0. 0.
0. 0.
0. 0.
0. 0.
0. 0.
S.D.
687861.
94679.
14259.
11415.
2427.
S.D.
12438640.
1021330.
127970.
106521.
16570.
* 1 1* * 12*
14642. 0.
2169. 0.
6365. 0.
235504. 0.
3265. 0.
NUMBER
50.
164.
144.
261.
243.
NUMBER
65.
298.
148.
268.
83.
MAX
MIN
AVE
TOT
SO
*1*
0.
0.
0.
0.
0.
*2*
0.
0 .
0.
0.
0.
*3*
0.
0.
0.
0.
0.
DISTRIBUTION OF UNNU»L OEM TRE»TMENT COSTS <* 1000)
*7* *8*
573.
0.
24.
15973.
55.
0.
0.
0.
0.
0.
1593.
t.
65.
55962.
117.
0.
0.
0.
0.
0.
459.
I.
22.
15300.
44.
SO OR S.D.
REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
1528.
213.
600.
22186.
316.
*12*
0.
0.
0.
0.
0.
-------
SIC CODE...
TOTAL NUMBER
28
* NATIONAL TOTM.S *
FLOW OF LEAST EFFICIENT WATER USE REGION MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS!
OF MANUFACTURING PLANTS... 1421
MANUFACTURING EMPLOYMENT
Fl nw IMGY)
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOTAL ANNUAL COST
MAXIMUM
28600.
174719.
154120048.
5331084.
24904304.
MINIMUM
25.
5.
8881.
R20.
1947.
AVERAGE
550.
1274.
837Z78.
66278.
172624.
TOTAL
781889.
1810721.
1 189771776.
941 81408.
245298736.
S.D.
1398.
6252.
4700918.
220994.
8C3450.
OEM
94181408.
4NNU4L COST OF WftSTE TREATMENT
REPLACEMENT INTEREST
59488576.
91612368.
TOTAL
245282352.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
inoooo. TO 500000.
o. TO icoooo.
MAX
MIN
AVE
TOT
SO
121190.
0.
671.
259041.
6604.
*2*
2449.
2.
49.
59676 .
129.
MAXIMUM
5331084.
484563.
9S383.
49574.
9934.
MAXIMUM
192650048.
4956188.
996103.
497698.
99025.
MINIMUM
511939.
100263.
5007*.
10021.
820.
AVERAGE
1239408.
201510.
690B5.
24409.
5738.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5266615.
1005091.
500316.
100448.
1 1101 .
4VER4GE
17663008.
IS88208.
7D2562.
257872.
51302.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMfNT ($ 1000)
5842.
21.
250.
304670.
352.
*4*
14682.
0.
12?.
172681.'
555.
*5*
490.
0.
37.
22804.
45.
*6*
2755.
0.
381.
116194.
389.
83.
l~\
•. 9
38.
4070.
10.
*8*
9466.
0.
305.
249897.
620.
TOTAL
29745792.
32040128.
1354O6B9.
16842432.
2019706.
TOTAL
635868672.
465240832.
193204656.
184893888.
8157022.
35.
0.
8.
821.
*10*
0.
0.
0.
0.
0.
S;D.
1126818.
100606.
14197.
10451 .
2579.
S.O.
32951744.
1001469.
140632.
106174.
28813.
*11*
0.
0.
0.
0.
0.
NUMBER
24.
159.
19fr.
690.
352.
NUMBER
36.
234.
275.
717.
159.
*12*
0.
0.
0.
0.
0.
M4X
MIN
AVF
TOT
so
*1*
645.
0.
15.
5964.
*2*
35.
3 .
1.
1560.
2 .
1504.
0 .
33.
40087.
84.
DISTRIBUTION OF 4NNIJ »L OEM TREJTMENT COSTS C$ 1000)
*7* *8* *9*
571.
0.
7.
1C622.
24.
1746.
0.
32.
19885.
108.
288.
0.
24.
7436.
16.
0.
3.
270.
2.
8?9 .
0.
10.
8156 .
39.
13.
0.
z.
201.
3.
*10*
0.
0.
0.
0.
0.
*u*
0.
0.
0.
0.
0.
*u*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARC DEVIATION. THE DATA DISTRI8UTICN USED IS HIGHLY SKEWED.
-------
SIC CODE... 29
TOTAL NUMBER CF MANUFACTURING PLANTS...
* NSTIONSL TOTMS *
FLOW OF LEAST EFFICIENT WATER USE REGION MOOIFIEO
1968 FLOW CONDITIONS ( 1967 DOLLARS)
334
CO
MANUFACTURING EMPLOYMFNT
ROW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAl OSM COST
TOT4L ANNUAL COST
COST RSNGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO t000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SO
*1*
37601.
•5.
897.
299446.
3968.
*2*
419.
0.
33 ,
11088.
61 ,
MAXIMUM
10000.
25451.
67004336.
1909998.
10419546.
OSM
46310352.
OISTR
MAXIMUM
1909998 .
489763.
98149.
49451 .
9821.
MINIMUM
27.
4.
26943.
1645.
5067.
4NNU&L COST OF W&STE
REPLACEMFNT
•> 1732352.
I8UTION OF OPERATICIV A
MINIMUM
538860.
100704.
50492.
10142.
1645.
AVERAGE
381.
1211.
3097746.
138654.
532080.
TREATMENT
INTEREST
79667792.
ho MAINTENANCE COST
AVERAGE
U23843.
217097.
69254.
27150.
5293 .
TOTAL
127318.
404317.
1034647296.
46310352.
177714608.
TOTAL
177710496.
TOTAL
20229184.
18453280.
4570786.
2715001.
344064.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
HUXIMUM
837554C8.
4895670.
991593.
478823.
96949.
DISTRIBUTION
*3* *4*
2325. 1047.
10. 0.
244. 52.
81636. 17515.
353. 137.
MINIMUM
5033110.
1013979 .
508609.
10 1174.
33679.
OF TOTAL CAPITAL COST
*5* *6*
35. 0.
0. 0.
11. C.
1097. 0.
6. 0.
AVERAGE
18145760.
2263279.
780613.
22U55.
68212.
FOR TREATMENT {$ 1000 1
*7* *8*
0. 212.
0. 0 .
0. 44.
0. 4504.
0. 38 .
TOTAL
961725952.
278383360.
351Z7600.
15038546.
3069536.
*9* *10*
0. 0.
0. 0.
0. 0,
0. 0.
0. 0.
s.o.
876.
3205.
8084842.
273359.
1294553.
S.O.
436631.
103867.
13044.
12461.
2266.
S.D.
19984640.
1059609.
148052.
L00242.
17734.
NUMBER
18.
85.
66.
100.
65.
NUMBER
53.
123.
45.
68.
45.
*lt*
0.
0.
0 .
0.
0.
*12*
26321.
150.
2681.
619354.
4285.
*3*
DISTRIBUTION OF &NNU SL 0£M TREATMENT COSTS It 1000)
*7* *8*
MAX
MIN
AVE
TOT
SO
482.
0.
34.
11308.
69.
7.
3.
1.
374.
I .
477.
0.
30.
10001.
66.
62.
0.
4.
1284.
9.
21
0
3
317
4
0.
0.
C.
0.
0.
0.
0.
0.
0.
0.
8 ,
0,
2,
184,
1.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
881.
6.
<3<3.
22844.
147.
SO OR S.O. REPRESENTS STANDARD CEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
* N»TICNU TOT4LS *
FLOW OF LEAST EFFICIENT HATER USE REGION MODIFIED
1-168 FLOH CCJNDITIONS ( 1967 DOLLARS)
SIC CODE... 30
TOTAL NUMBER OF MANUFACTURING PLANTS... 459
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
MAXIMUM
20000.
4897.
2438279.
288072.
597733.
MINIMUM
45.
3.
21613.
915.
3660.
AVERAGE
663.
130.
204688.
12848.
38844.
TOTAL
304302.
59572.
93951968.
5897263.
17829376.
S.D.
1295.
299.
184692.
19140.
42379.
0£M
5897263.
^NNU^L COST OF V«HSTE TREATMENT
REPLACEMENT INTEREST
4697598.
7234297.
TOTAL
17829152.
DISTRIBUTION OF OPERATION 4NO MAINTENANCE COST
*•>
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
t 000000. TO
500000. TO
IQOOOO. TO
0. TO
500000
100000
50000
10000
5000000,
1000000
500000
100000
MAXIMUM
0.
288072.
87816.
'+8902.
9930.
MAXIMUM
0.
3047848.
943558.
498353.
99021.
MINIMUM
0.
149120.
5C947.
10075.
915 .
AVERAGE
0.
197247.
63376.
17084.
6258 .
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1018852.
502751.
10 1396.
27016 .
AVEfUGE
0.
1651144.
693907.
227121.
78176.
TOTAL
0.
591740.
570387.
3058050.
1677199.
TOTAL
0.
9906869.
16653773.
87441408.
3439725.
S.O.
0.
78703.
11397.
8572.
2328.
S.D.
0.
785567.
149946.
85492.
16810.
NUMBER
0.
3.
9.
179.
268.
NUMBER
0.
6.
24.
385.
44.
DISTRIBUTION Of- TOTAL CAPITAL CCST FOR TREATMENT ($ 1000)
*2*
MAX
M If.
AVc
TOT
SO
0.
0.
0.
0.
0.
187.
1 .
11 .
4896.
13.
358.
. 4.
33.
15299.
28.
354.
0.
10.
4416.
22.
0.
0.
0.
D.
0.
*6*
843.
12.
S6.
44156.
71.
*7*
0.
0.
••?.
0.
0.
*8*
676.
5.
55.
25183.
52 .
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0 .
0.
0.
0.
0.
0.
0.
0.
MAX
MIN
AVE
rtP
so
*
0.
0.
0.
0.
0.
*2*
6.
V
1 .
354.
0.
*3*
56.
0.
2.
928.
4.
*4*
40.
0.
1.
612.
3.
DISTRIBUTION OF ANNUAL 0£M TRE«TMENT COSTS <$ 1000)
*5* *6* *7* *8*
0.
0.
0.
0.
0.
152.
0.
6.
2968.
to.
0.
0.
'• ' •
0.
0.
34,
0.
2 ,
1036.
2.
0 .
0.
0.
0.
0.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
so
OR S.D. REPRESENTS STANDARD CEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWEO
-------
SIC CODE... 31
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FLOW OF LEAST EFFICIENT WATER USE REGION MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
215
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOTIkL 4NNU4L COST
MAXIMUM
3700.
6349.
2553192.
214222.
456758.
MINIMUM
60.
6.
12165.
1061.
2606.
AVERAGE
238.
403606.
20028.
71287.
TOTAL
102307.
51165.
86775264.
4306096.
15326736.
S.O.
504.
SOS.
466767.
26394.
82708.
OGM
4306096.
4NNUU COST OF WASTE TREATMENT
REPLACEMENT INTEREST
4338762.
6681692.
TOTAL
15326550.
*•«
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO t 000 00.
MAX
MIN
AVE
TOT
SO
0.
0.
0.
0.
0.
DISTRIBUTION OF OPERATION AKD MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
0. 0. 0.
214222. 114131. 150792.
94026. 50403. 67894.
46835. 10076. 22725.
9739. 1061. 2617.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
279.
22.
75,
8221 .
50.
MAXIMUM
0.
3191490.
9650C7.
494153.
61739.
MINIMUM
0.
1012275.
517147.
109181.
15206.
0.
1531969.
695352.
314806.
29569.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENTS* 1000)
*3*
1057.
127.
345.
37899.
185.
*4*
609.
21.
115.
12635.
108.
*5*
9".
0.
14.
143T.
14.
*6*
0.
0.
0.
0.
0.
*7*
0.
0.
0.
0.
0 .
*8*
720.
8 .
124.
26588.
121.
TOTAL
0.
603166.
1018414.
2454297.
230268.
TOTAL
0.
55150896.
36158288.
14795888.
2365488.
0.
0.
0.
0.
o.
*10*
0.
0.
0.
0.
0.
S.D.
0.
43870.
12902.
9833.
2152.
S.D.
0.
578229.
128973.
119670.
9246.
NUMBER
0.
4.
15.
108.
88.
NUMBER
0.
36.
52.
47.
80.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
M4X
MfN
4VE
TOT
SO
*1*
*2*
*3*
DISTRIBUTION OF 4NNU »L OEM TREATMENT COSTS (* 1000)
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
4.
1 .
1.
160.
I .
101.
5.
21.
22£9.
18.
24.
I.
5.
536.
4.
175
0
7
721
19
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
39.
I.
3.
619.
3.
0.
0.
0.
0.
0.
*10*
0.
0.
0.
0.
c.
*tl*
0.
o.-
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
SIC CODE... 32
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FLOW OF LEAST EFFICIENT HATER USE REGION MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
•5*5
•
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOT^L ANNUAL COST
MAXIMUM
8000*
7648.
2938875.
503523.
872780.
OGM
20918176.
MINIMUM
50.
5.
20021.
888.
3456.
ANNUM. COST OF WASTE
REPLACEMENT
9028210.
DISTRIBUTION OF OPERATION
COST R&NGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TC 50000.
0. TO 10000.
CO
^ COST R4NG€
> 5000000.
1 000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 1 00000.
*1* *2*
MAX 0. 0.
MIN 0. 0.
AVF 0. 0.
TOT 0. C.
so o. o .
MAXIMUM
503523.
499543.
95S50.
49749.
9944.
MINIMUM
503523.
102218.
52885.
10058.
888.
AVERAGE
345.
249.
191073.
22136.
46
-------
kJj
cn
SIC CODE...
TPTAL NUMBER
Of
33
MANUFACTURING EMPtOYMrNT
Fl OW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL oew COST
TOT 51. ANNUM COST
COST RANGf-
> 500000.
100000. TO
^0000. TO
10000. TO
0. TO
500000.
100000
50000.
10000.
C(Sr RANGE
> 5000000.
•OOOOOO TO 50COOOO.
500000. TO 1000000.
100000. T0 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
M W
MIN
AVE
TOT
SD
*1*
127753.
6,
2211 .
758376.
10868.
*l*
1363.
0.
78.
26755.
170.
*7f
2354.
1 .
64
69903.
187,
*2*
59.
0 .
2.
2351 .
5 .
FLOW OF LEAST EFFICIFNI WATER
96" F( OW CONDI IONS (
!UR ING PLANTS... 1137
MAXIMUM MI N! 11 M
r 28000. 0.
96*35. 3.
,505i9M6. 16805.
f-. 808742. 776.
259?7?48. 291 1.
\NNl & COST Or W5ST
OEM RFPi-ACEM^N*
1.46210000. RO*H03ZO«
o's^R auiiiN OF HPERA ,cn AI 5C'»9l).
49998. 10 4'».
909^, 776 .
USE R'GI ON MTU F I £ D
1967 001 ARSI
AVtRA(;c
90 2.
t50e.
.41566 .
128593.
3 08X9 Si.
^c» MENT
I NTERE NI
1239»,64?.
) f* S NT EN 4NCF CO j
4V c. AC.
1679851 .
'O'a1; .
23^55=
5 il .
015 RIBUT ;ON OF NV/ESTMtN RfrUU ! KF }•, EN 1 S
MAXIMUM MIMMi. M IVVERSGE
188174512. 5044T70 2J9922T2.
4763.6'. 019747. ZI4O676.
998590. 50C588. 694539.
4*12505 A0430, yl ifSg
9 9.. 79. ?101 . &oi9p.
O.M Rl 81 1 TON OF TOTAL CAP 'Ai_ «CS1
*^* *4* «5* *6*
B050. lOO^'B. 0. 836.
14. 0. 0. 0.
380. 164. 0 82
346887. 186295. n, 59-V3.
754. 664. 0. 8-J,
DISTRIBUTION O1" &NNU 5L OSM TPE«
«3* *4* *5* *6*
4390. 813. O. 153
0. 0. ".
TMENf COSTb < $ 1000 1
w /+ * 8*
0 . 1 P3 .
0. 1
0. 16 .
0. J319.
0. £-6.
TOTAL
1025720.
1804094.
Io09606656.
',62 iflOPO.
TOT A
»S062988':
01 A!
92391824.
31*21T96.
5«75 '8.
7«9401Q.
25 5143.
10TSL
14635^9472.
329664256.
79871966.
I 22000688
J709' 792.
*9*
0,
0.
0.
0.
0 .
.6948.
0.
585, ,
40 j I .
0 .
0.
0,
0 .
0.
0,
9
5.
2 i J
?>'»« 9.
t 5 6 4 fi .
<,. n
343H ;?-> 7
9471 ) <- .
I. - 12 1
03 , M
1 '
0.
V.
0
c.
I) V
*)1*
0,
c .
n..
o.
11
* i z *
u
0
n
'17-
OR S.D. REPRESENTS STANDARD EEVIATION. THE DATA OISTRIBUTICN USED IS HIGHLY SKEWED.
-------
* N8TIGNU TOT MS *
FLOW DF LEAST EFFICIENT WATER CSE REGION MODIFIED
1968 FLO* CONDITIONS < 1967 DOLLARS)
SIC CODE... 3* „
TOTAL NUMBER CF MANUFACTURING PLANTS... 1037
MANUFACTURING EMPLOYMENT
FlOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTHL 4NNIHL COST
MAXIMUM
14000.
1935.
1053750.
I 86429.
320756,
OEM
12506014.
Mt NIMUM
54.
2.
11417.
650.
2154.
^NNUHL COST OF WASTE
RFPLAOMENI
618171H.
AVERAGE
565.
105.
L 19223.
12060.
?7!99.
TREATMENT
INTEREST
951.9<-< 8601 6.
109345.
123634384.
12506014.
28205232.
•
TOTAL
28207568.
DISTRIBUTION OF OPERATION UNO MSINTENWICF COST
COST R 4NGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
CO
"** COST RANGE
> 5000000.
1 000000, TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 1COOOO,
MAXIMUM
0.
186429.
99522.
49789.
99-32.
MAXIMUM
0.
| ? j 7j 87.
88068^.
A80208.
9<5<)47.
MINIMUM
0.
ID 287 3.
51735.
10020 .
650.
OTSTP 'OUT ION OF INVES
t»1H\ f-'UM
0,
10 T r-?237 .
5071 3* ,
{ 0 fiO ft 3 .
\ '*?. ( ? f
AVERAGE
0.
136193 .
68661 .
17106.
5429.
TMENT REQUIREMENTS
AVff'ftGE
D.
' (.6 740ft.
644 i 67 .
1745;'S .
o-.OSfl .
TOTAL
0.
953348.
1235894.
7064812.
3252048.
TOTAL
0.
5837030.
1223917(1.
I 13089424 .
23330992.
*2*
DISTRIBUTION
VITAL CAPITAL CCS? F OK 1'i
* 5* *v *-*
e S I.OCOJ
*10*
MAX
KIN
AVE
tOT
SO
0.
0.
0.
0.
0.
102 .
I .
1C .
I 0541 .
10.
6?6 .
10.
90.
931Q6.
6*,
308,
0.
i r.
1 7'58a.
26.
a.
0.
0..
o „
o
t..- »
0. 0.
0 . 0 .
0. 0.
0 ,
0 . } ,
0.
0.
0.
0.
0 .
18.
n ,
2 .
?308,
2 .
0.
0.
0.
0.
0
S ,0.
075.
165.
101750.
15275.
28095,
S.D. Nllf'BF
0. •).
289-J'?. 7.
1575*.
7948. 4' 5.
S.D,
0.
113578.
12«223..
7 J583
H4'. 7°.
*.!.}*
0 .
0.
.1
0.
*12*
0
0
I!
*?*
0'-' i\f>NiK.L OEM TRFCTMcNr f'ST', i* '0001
* *=
M4X
Hi f'i
AVE
TOT
SO
0.
0.
0.
0.
0.
-------
-
35
* NATIONAL TOTALS *
FLOW Of LEAST EFFICIENT WATER USE REGION MODIFIED
l968 FLOM CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER CF MANUFACTURING PLANTS... 790
MANUFACTURING EMPLOYMENT
FLOW (MGYJ
TOTAL CAPITAL COST
TOTAL ANNUAL OfiM COST
TOTAL ANNUAL COST
MAXIMUM
36000.
4290.
1876150.
334738.
573C09.
MINIMUM
9.
0.
1721.
20.
238.
AVERAGE
1260.
125.
126457.
13468.
29526.
TOTAL
995341.
98963.
99900832 .
10639437.
2332579?..
S.D.
227''.
2<.8.
146501 .
22135.
40 6 ? •>.
w
00
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
10639437.
4995041.
7692360,
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
0. 0. 0.
334738. 102463. 177506.
99560. 51629. 71549, ?
49573. 10004. 20,677".
9988. 20. 4985.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE
0. • 0. 0.
2345187. 1093486. 1617760.
988624. 524762. 716858.
493675. 100H8. 199162.
99465. 2152. 63853.
DISTRIBUTION OF TOTAL CAPITAL CCST FOR TREATMENT <$ 1000)
*5* *6* *7* *8* *9*
TOTAL
23326832.
TOTAL
0.
1242542.
1502534.
5396786.
2497678.
TOTAL
0.
8088801.
13620301.
79864128.
23306272.
S.D.
0.
85071.
1 3868.
10280.
2468.
S.D.
0.
638285.
129218.
97756.
23944.
NUMHfcR
0 .
7,
2t.
261 .
501.
NUMBF.R
0.
-------
SIC CODE... 36
TOTAL NUMBER OF MANUFACTURING PLANTS...
* NATIONAL TOTALS *
FLOW OF LEAST EFFICIENT HATER USE REGION MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
817
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
T3TAL ANNUAL 0£M COST
TOTAL ANNUAL COST
MAXIMUM
22800.
6398.
2490655.
497106.
813419.
MINIMUM
60.
8.
26463.
1555.
5054.
AVERAGE
1535.
159.
153479.
16380.
35870.
TOTAL
1254103.
130111.
125392592.
13382817.
29305712.
S.D.
2272.
357.
166841.
29280.
50236.
OSM
13382817.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
6269629.
9655224.
TOTAL
29307648.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SO
*l*
0.
0.
0.
0.
0.
DISTRIBUTION OF OPERATION
MAXIMUM MINIMUM
0. 0.
497106. 100996.
35255. 51978.
49243. 10001 .
9877. 1555.
4ND MAINTENANCE COST
AVERAGE
0.
198474.
65501.
19274.
6166.
MAXIMUM
0.
31!3318.
93C5S4.
497958.
99972.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1040946.
. 502061.
100345.
33078.
AVERAGE
0.
1542685.
649143.
193612.
76063.
DISTRIBUTION OF TDTAL CAPITAL COST FOR TREATMENT «* 1000)
TOTAL
0.
2381691.
1441023.
6958043.
2602138.
TOTAL
0.
15426856.
15579436.
109003408.
16733883.
236.
2.
13.
10966.
16.
1264.
23.
11?.
91393.
96.
*4*
953.
1.
25.
2C712.
54.
*5*
0.
0.
0.
0.
0.
*6*
0.
0.
0.
0.
0.
*7*
0.
0.
0.
0.
*8*
0.
0.
0.
0.
0.
*9*
37.
0.
3 .
2314.
*10*
0.
0.
0.
c.
0.
S.D.
0.
123137.
11783.
9148.
2033.
S.D.
0.
716230.
115664.
87472.
15695.
*11*
0.
0.
0.
0.
0.
NUMBER
0.
12.
22.
361.
422.
NUMBER
0.
10.
24.
563.
220.
*12*
0.
0.
0.
0.
0.
MAX
AVE
TOT
SD
*l*
0.
0.
0.
0.
0.
*2*
7.
0.
1.
698.
t .
*3*
I ,
12.
9490,
21,
DISTRIBUTION OF ANNUAL OSM TRE»TMENT COSTS (* 1000)
*/»* *5* *6* *7* *8* *9*
103.
0.
3.
2586.
6.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
24.
0.
1.
608.
1.
MO*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
in OF...
!. N'JMPEP
37
OF MArJUF AC >1,RIMG PI ANTS.
* M&TIOMH TOTALS »
HOW OF LEAST EFFICIENT WATER USfc FU.GICN MODIFIED
1968 FlOW CONDITIONS ( 1967 DOLLARS!
MANI.'FACTUR INC tMPl UVKENT
f! flW (MGY)
rnrs CAPITAL >:,05T
TflTAl ANM'Al. OtM COS I
rrif ^; ANNUit CCKT
MAXIMUM
38000.
5S35.
2469 3815?7.
3056988R.
S.O.
3843.
568.
2763R9.
83166.
COST OH V»4S1£ TREiTNiENf
REPLACEMPMT INTERtSI
15381527.
5980^9.
9209887,
TOTAL
305718^0.
rfN
COST RANGE
> 500000,
iGOOQO. 10
50000, Tn
10000, TO
0. TO
C!ST 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
TOT
SD
0.
0.
0.
0.
0.
235,
1 .
10825.
27.
MA X I M Urt
505230,
351-.U2.
94801,
49512.
3955.
MAXIMUM
0.
3087420.
962656.
49«2q$.
98016.
DISTRIBUTION
* 3* *
-------
EPA ADMINISTRATIVE REGION SUMMARIES
FOR
MANUFACTURING
441
-------
EPA Administrative Region Tables
Each table summarizes aggregated manufacturing conditions for one federal
administrative region (cf. map). There are three sets of tables, each
calculated on the basis of a separate level of observed efficiency of
industrial water use.
The first set of regional tables presents treatment costs calculated on
the basis of industrial water use reported for 1968. The second set of
tables' costs reflect the use of "median or below" water use data, that
is, in each SIC group all regional values below the efficiency of the
group median are assumed to be equal to the median. The third set of
costs occurs when for each SIC group all regional values below the effi-
ciency of the most efficient third are made equal to the lowest regional
efficiency among the most efficient third.
442
-------
UNITED STATES
ENVIRONMENTAL PROTECTION AGENCY
Regional Offices
r\
IAIN
I
MAINE
N.J. New York
Philadelphia
-------
TOTAL NUMBER OF MANUFACTURING PLANTS..,
EPA REGION 1
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
1188
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
805.
0.
37.
1956.
111.
*2*
279.
0.
12.
9647.
22.
MAXIMUM
26000.
38«63.
22591760.
1232981.
4102133.
OSM
23819296.
MINIMUM
1.
0.
3028.
273.
670.
ANNUAL COST OF WASTE
REPLACEMENT
18862192.
DISTRIBUTION OF OPERATION
MAXIMUM
1232981.
478572.
96176.
46529.
9996.
MINIMUM
512816.
106556.
50490.
10056.
273.
AVERAGE
613.
394.
317515.
20075.
60111.
TREATMENT
INTEREST
29017760.
AND MAINTENANCE COST
AVERAGE
902318.
186311.
70731.
18822.
1128.
TOTAL
728515.
167696.
377243904.
23819296.
71768816.
TOTAL
71759248
TOTAL
1511712.
5961915.
3324338.
6757246.
3298713.
DISTRIBUTION OF INVESTMENT PEQUIREMENTS
MAXIMUM
28239696.
4357301.
990903.
493215.
998U8.
DISTRIBUTION
*3* *4*
1057. 7122.
0. 0.
85. 62.
66032. 58052.
99. 38U.
MINIMUM
5538211.
1013167.
516172.
100083.
3785.
AVERAGE
16128292.
1925*035.
687181.
217748.
57426.
TOTAL
112898048.
144377661.
58136144.
132172960.
23774400.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
139. 2871.
4. 0.
15. 201.
1379. 110973.
17. 324.
*7* *8*
31. 4290.
0. 4.
30. 1U7.
60. 97726.
1. 310.
*9* *10*
17. 0.
0. 0.
2. 0.
815. 0.
2. 0.
S.D.
1328.
1969.
1155546.
68760.
214598.
S.D.
262026.
83977.
13537.
8456.
2632.
S.D.
8414334.
914812.
131929.
102177.
24722.
*11*
8009.
0.
5841.
29205.
1770.
NUMBER
5.
32.
47.
359.
745.
NUMBER
7.
75.
85.
607.
411.
*12*
1237.
0.
734.
1469.
711.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*H* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
56.
0.
5.
259.
9.
5.
0.
1.
522.
0.
174.
0.
7.
5318.
13.
187.
0.
4.
3254.
11.
152.
0.
5.
511.
16.
367
0
16
8602
36
1.
0.
1.
2.
0.
131.
0.
4.
2807.
10.
8.
0.
1.
182.
1.
*10*
0.
0.
0.
0.
0.
*11*
620.
0.
170.
2318.
129.
*12*
39.
0.
23.
47.
22.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF
EPA REGION 1
FLCV< LESS THAN OR EQUAL TC MEDIAN CF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
MANUFACTURING PLANTS... 1188
f AND F AC TDK ING EMPLOYMENT
fOTAL CAPITAL COST
TC1AL ANNUAL 0 £M COST
TIIIAL ANNUAL COST
MAXIMUM
56COO.
38463.
22591760.
1232981.
4102133.
OtM
M I N I MU M
4.
C.
3028.
273.
670.
ANNUAL COST OF WASTE
REPLACEMENT
AVERAGE
613.
380.
307532.
19158.
58222.
TREATMENT
INTEREST
TOTAL
728515.
451957.
365347584.
22759520.
69167584.
TOTAL
S.D.
1328.
1969.
1155402.
68646.
214527.
22759520.
18267376.
28131744.
69158640.
*1*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CCSI ^/SNGE
> 50CCCO.
100000. TO
?OOOC. TO
10000. TO
0. TO
CCST RANGE
> 500CCCO.
1000000. TO
5COOOO. TO
1CCOOO. TO
0. TO
500300.
100000.
500CC.
10000.
50000CO.
1000 JOO.
500QCO.
100JOO.
MAXIMUM
1232S81.
478572.
96176.
49718.
9943.
MAXIMUM
28239696.
4357301.
989594.
493215.
9S348.
MINIMUM
542816.
102258.
50490.
10009.
273.
DISTRIBUTION CF
MINIMUM
5538211.
1013167.
500541.
100476.
3785.
AVERAGE
902348.
186584.
71254.
18482.
4467.
INVESTMENT REQUIREMENTS
AVERAGE
16128292.
1948116.
686787.
209986.
58926.
TOTAL
4511742.
5784107.
3206427.
5692492.
3569046.
TOTAL
1 12898048.
140264368.
54256144.
123261568.
26104160.
S.D.
262026.
85789.
14223.
8142.
2563.
S.D.
8414334.
922515.
138550.
99930.
25029.
NUMBER
5.
31.
45.
308.
799.
NUMBER
7.
72.
79.
587.
443.
DISTRIBUTION CF TOTAL CAPITAL COST FOR TREATMENT (t 1000)
*3* *4* *5* *fc* *7* *8* *9*
*10*
*u*
*2*
*3*
DISTRIBUTION 3F ANNUAL OEM TREATMENT COSTS (t 1000»
*«* *5*' *6* *7* *8* *9*
*10*
*12*
MAX
MIN
AVE
TOT
SO
805.
0.
35.
1860.
111.
?79.
0.
1 1.
8921.
21.
1057.
0.
78.
61243.
95.
7422.
0.
61.
564S7.
384.
139.
4.
14.
1362.
17.
2371.
0.
198.
108829.
524.
31.
0.
30.
60.
1.
4290.
4.
143.
95634.
340.
14.
0.
2.
714.
2.
0.
0.
0.
0.
0.
8009.
0.
5841.
29205.
1770.
860.
0.
546.
1092.
444.
*12*
("AX
MIK
AVt
TCT
SO
56.
0.
5.
239.
9.
5.
0.
1.
0.
174.
0.
6.
4726.
12.
187.
0.
3.
3C68.
11.
152.
0.
5.
- 497.
16.
367.
0.
15.
8429.
36.
1.
0.
1.
2.
0.
131.
0.
4.
2751.
10.
5.
0.
0.
149.
1.
0.
C.
0.
0.
0.
620.
0.
470.
2348.
129.
28.
0.
18.
35.
14.
OR S.D. RCPRFSENTS STANDARD CEVIATICN. THE DATfi DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 1
FLOW Cf LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLCW CONDITIONS ( 1967 COLLARS)
TCTAL NUMBER OF f ANUFACTUH ING PLANTS... H88
PANUFACTURING EMPLOYMENT
FLOW (MOYI
TCTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
1COOOO. TO 5000CC.
5000C. TO 100000.
1COOO. TO 500CO.
0. TO 100CO.
CCST RANGE
> 500COCO.
1COOOOO. TO 5000000.
5COOOO. TO 1000000.
1C0030. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SO
*1*
805.
0.
34.
1823.
III.
*2*
279.
0.
11.
8479.
21,
MAXIMUM
26000.
26884.
18275?eg.
995540.
3316577.
OEM
195127C4.
MINIMUM
4.
0.
3028.
273.
670.
ANNUAL CCST OF WASTE
REPLACEMENT
16067826.
DISTRIBUTION OF OPERATION
MAXIMUM
995540.
425565.
97433.
48829.
9943.
MINIMIP
673024.
100503.
5C4<50.
10076.
273.
AVERAGE
613.
303.
270502.
16425.
50783.
TREATMENT
INTEREST
24744432.
AND MAINTENANCE COST
AVERAGE
802768.
18C123.
70923.
18899.
4396.
TOTAL
728515.
360059.
321356544.
19512704.
60330336.
TOTAL
60324960.
TOTAL
3211071.
4683185.
2695092.
5216055.
3709835.
S.O.
1328.
1490.
945451.
55982.
175281.
S.O.
155431.
90955.
14399.
8811.
2503.
NUMBER
4.
26.
38.
276.
844.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
PAXIMUM
22844848.
3826667.
989122.
495920.
99848.
DISTRIBUTION
*3* *4*
1057. 5596.
0. C.
74. 4S.
58024. 45220.
93. 291.
MINIMUM
5538211.
1013167.
502827.
100122.
3785.
AVERAGE
13246217.
1805030.
703885.
205908.
59127.
TOTAL
92723520.
110106848.
54199168.
116544208.
28203712.
S.O.
6580989.
772362.
149610.
97928.
24477.
NUMBER
7.
61.
77.
566.
477.
OF TOTAL CAPITAL COST FCR TREATMENT ($ 1000J
*5* *6*
139. 2450.
4. 0.
14. 175.
1355. 96546.
17. 277.
*7* *8*
31. 3568.
0. 4.
30. 126.
60. 84086.
1. 285.
*9* *10*
14. 0.
0. 0.
2. 0.
649. 0.
2. 0.
*ll* *12*
6662. 647.
0. 0.
4858. 439.
24290. 878.
1472. 293.
*1*
*2*
DISTRIBUTICN CF ANNUAL CCP TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MN
AVE
TCT
SO
56.
0.
4.
231.
9.
5.
0.
1.
481.
0.
174.
0.
6.
4354.
12.
144.
0.
3.
2581.
9.
152.
0.
5.
492.
16.
290.
C.
13.
6899.
29.
1.
0.
1.
2.
0.
100.
0.
4.
2352.
8.
5.
0.
0.
131.
0.
*10*
0.
0.
0.
0.
0.
*u*
518.
0.
392.
1962.
108.
*12*
21.
0.
14.
29.
9.
SO OR S.C. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS..,
EPA REGION 2
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
1575
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O&M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
rf» COST RANGE
>*>• > 5000000.
00 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
.TOT
SD
*1*
67387.
0.
1066.
153572.
7920.
*2*
1829.
0.
22.
23150.
92.
MAXIMUM
36300.
69403.
811761504.
4721033.
15485741.
OEM
43840688.
MINIMUM
3.
0.
1721.
20.
238.
ANNUAL COST OF WASTE
REPLACEMENT
35269840.
AVERAGE
609.
392.
447871.
27835.
84722.
TREATMENT
INTEREST
54315536.
TOTAL
958502.
617454.
705396992.
43840688.
133437504.
TOTAL
133426064
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
4721033.
469437.
98284.
49749.
9966.
MINIMUM
555945.
105625.
50052.
10001.
20.
AVERAGE
1914005.
206304.
67547.
20787.
4945.
TOTAL
13398035.
10934091.
4255471.
10601251.
4657805.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
105951872.
4124582.
963821.
497958.
99972.
DISTRIBUTION
*3* *4*
6450. 7529.
0. 0.
136. 62.
133814. 72090.
330. 397.
MINIMUM
5027460.
1017039.
500009.
100448.
2152.
OF TOTAL CAPITAL COST
*5* *6*
151. 3087.
5. 0.
22. 177.
4239. 126299.
18. 270.
AVERAGE
25375440.
1780353.
677378.
220422.
64187.
FOR TREATMENT ($
*7* *8*
49. 4557.
0. 4.
41. 128.
203. 116446.
5. 256.
TOTAL
380631808.
169133584.
109735280.
195734944.
26637536.
1000)
*9* *10*
33. 16948.
0. 0.
3. 9499.
1243. 18998.
3. 10534.
S.D.
1716.
2746.
3219516.
178790.
586214.
S.D.
1940777.
92204.
13517.
9837.
2513.
S.D.
33644304.
723269.
131472.
100606.
23946.
NUMBER
7.
53.
63.
510.
942.
NUMBER
15.
95.
162.
888.
415.
*11*
8508.
0.
8508.
8508.
0.
*12*
12469.
0.
4265.
46916.
3759.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
967.
0.
24.
3408.
115.
43.
0.
1.
939.
2.
3025.
0.
18.
18040.
139.
562.
0.
5.
5363.
25.
160.
0.
7.
1420.
14.
388
0
12
8667
32
*10*
*11*
*12*
3.
0.
2.
9.
1.
147.
0.
4.
3452.
9.
18.
0.
1.
275.
1.
21.
0.
12,
25.
12.
725.
0.
725.
725.
0.
396.
0.
138.
1521.
119.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 2
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE KEGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS*
TOTAL NUMBER OF MANUFACTURING PLANTS... 1575
FLCW (MGYI
TOTAL CAPITAL COST
TOTAL ANNUAL 06M
TOTAL ANNUAL COST
**•
COST RANGE
> 500000.
IOOOOC. TO 500000
5000 C. TO
10000. TO
0. TO
CCST RANGE
> 500COOO.
1000000. TO 5000000
500000. TO 1000000
100000. TO
C. TO
MAX
HIN
AVE
TCT
SO
*1*
29195.
0.
487.
70134.
3433.
MPLOYMEN
OST
M COST
ST
MAXIMUM
IT 363CO.
44147.
41332192.
3158657.
8407844.
OEM
37278640.
MINIMUM
3.
0.
1721.
20.
238.
ANNUAL COST OF WASTt
REPLACEMENT
28495824.
AVERAGE
609.
332.
361852.
23669.
69631.
TREATMENT
INTEREST
43883552.
TOTAL
958502.
523346.
569916672.
37278640.
109669520.
TOTAL
109658016.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
000.
000.
ooo.
000.
MAXIMUM
3158657.
434268.
98284.
49332.
9966.
MINIMUM
555945.
100192.
50052.
10001.
20.
AVERAGE
1568394.
184507.
68654.
20725.
4883.
TOTAL
9410364.
9594370.
3501359.
9968769.
4809740.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
000.
1000.
1000.
>000.
*2*
1305.
0.
19.
20605.
73.
MAXIMUM
51665232.
4211310.
992622.
497958.
99S72.
DISTRIBUTION
*3* *4*
4806. 7529.
0. 0.
121. 53.
119654. 619E4.
256. 322.
MINIMUM
5027460.
1017039.
507642.
100448.
2152.
OF TOTAL CAPITAL COST
*5* *6*
151. 3067.
5. 0.
22. 174.
4198. 124057.
18. 270.
AVERAGE
17713408.
1750592.
690487.
216384.
64669.
FOR TREATMENT {$ 1000)
*7* *8*
49. 4557.
0. 4.
41. 125.
203. 113899. 1
5. 250.
TOTAL
230274400.
161054480.
102192032.
190417792.
285838C8.
*9* *10*
22. 10781.
0. 0.
3. 6415.
1?2. 12831.
3. 6173.
S.O.
1716.
1950.
174C840.
125230.
34456S.
S.D.
1276292.
84678.
13737.
9669.
2452.
S.O.
16428335.
755425.
138404.
100181.
23837.
NUMBER
6.
52.
51.
481.
985.
NUMBER
13.
92.
148.
880.
442.
*11*
8508.
0.
8508.
8508.
0.
*12*
8671.
0.
2985.
32832.
2595.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS 1$ 1000)
*
-------
EPA REGICN 2
FLOW OF LEAST EFFICIENT TlnO-THIRDS OF HATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1575
MAXIMUM
MANUFACTURING EMPLOYMENT 36300.
FLCW (MGYI
TOTAL CAPITAL CCST
TCTAL ANNUAL OCM COST
TCTAL ANNUAL COST
CCST RANGE
> 5000CO.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
C. TO 10000.
3J622.
24533520.
2292765.
54C8521.
OEM
32266S44.
DISTR
MAXIMUM
2292145.
434288.
98395.
49322.
9996.
MINIMUM
3.
C.
1721.
20.
238.
ANNUAL COST OF hASTE
REPLACEMENT
24675360.
AVERAGE
609.
288.
313338.
20488.
60289.
TREATMENT
INTEREST
38000032.
TOTAL
958502.
453009.
493507328.
32268944.
94954576.
TOTAL
94944336.
IBUTION OF OPERATION AND MAINTENANCE COST
MINI MU M
555945.
100382.
50052.
10021.
20.
AVERAGE
1424388.
184131.
71114.
20866.
4694.
TOTAL
7121940.
7733489.
3697920.
8763546.
4957228.
£> DISTRIBLTION OF INVESTMENT REQUIREMENTS
Ul CCST RANGE
O > 500CCCO.
1000000. TO 50000CO.
JOOOOC. TO 1000000.
1000JO. TO 5000CO.
0. TO 100000.
*1* *2*
MAX 15385. 996.
flU 0. 0.
AVE 271. 17.
TOT 39042. 18230.
SD 1808. 62.
MAXIMUM
306668S6.
4747541.
963821.
497958.
99S68.
DISTRIBUTION
*3* *4*
3802. 7529.
0. 0.
108. 47.
106798. 54653.
210. 290.
MINIMUM
5027460.
1004459.
507642.
100448.
2152.
OF TOTAL CAPITAL COST
*5* *6*
126. 30E7.
5. 0.
21. 166.
3992. 118191.
16. 269.
AVERAGE
15849464.
1816350.
698923.
208656.
64295.
FCR TREATMENT 1$ 1000
*7* *8*
49. 4557.
0. 4.
41. 118.
203. 107432.
5. 243.
TOTAL
158494640.
152573456.
99946032.
173392880.
32597456.
)
*9* *10*
22. 8653.
0. 0.
2. 5351.
986. 10703.
3. 4669.
S.D.
1716.
1569.
1223960.
96737.
249663.
S.D.
867299.
83518.
15113.
9910.
2415.
S.O.
10284905.
890981.
134929.
98717.
23507.
NUMBER
5.
42.
52.
420.
1056.
NUMBER
10.
84.
143.
831.
507.
*11*
8508.
0.
8508.
8508.
0.
*12*
6517.
0.
2259.
24847.
1936.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS (t 10CO)
#5* *6* *7* *8* *9*
M*X
MN
AVE
TOT
SO
494.
0.
14.
1964.
59.
23.
0.
1.
811.
1.
1445.
0.
12.
11434.
68.
27C.
0.
3.
3905.
14.
115.
0.
6.
1248.
11.
388.
0.
11.
8039.
31.
*10*
*11*
*12*
3.
0.
2.
9.
1.
147.
0.
3.
3111.
8.
6.
0.
0.
189.
1.
12.
0.
8.
16.
6.
725.
0.
725.
725.
0.
211.
0.
75.
822.
62.
SD CR S.C. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
EPA REGION 3
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
1777
Ul
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
28600.
64697.
52425024.
3101819.
8201226.
OEM
71370560.
MINIMUM
8.
0.
2625.
253.
586.
ANNUAL COST OF WASTE
REPLACEMENT
46090608.
DISTRIBUTION OF OPERATION
MAXIMUM
3101819.
499543.
99322.
49531.
9997.
MINIMUM
504294.
100787.
50076.
10013.
253.
AVERAGE
637.
589.
518746.
40164.
106052.
TREATMENT
INTEREST
70979504.
AND MAINTENANCE COST
AVERAGE
1255242.
230031.
69771.
20896.
4590.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
65531280.
4608797.
995335.
497428.
99799.
MINIMUM
5117148.
1012700.
505355.
100216.
3281.
AVERAGE
17393808.
2128561.
692227.
215803.
61604.
TOTAL
1131409.
1046792.
921812224.
71370560.
188454320.
TOTAL
188440672.
TOTAL
31381056.
18632480.
5651446.
10782371.
4930096.
TOTAL
539208192.
283098624.
94835072.
201991904.
33266080.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
*10*
S.D.
1526.
3071.
2469085.
176043.
476069.
S*D.
722561.
111144.
13907.
9969.
2534.
S.D.
15762845.
906668.
138148.
98087.
22378.
NUMBER
25.
81.
81.
516.
1074.
NUMBER
31.
133.
137.
936.
540.
*11*
*12*
MAX
MIN
AVE
TOT
SD
27284.
0.
1196.
191411.
4039.
1209.
0.
30.
35286.
89.
4450.
0.
168.
195272.
361.
11410.
0.
88.
110261.
445.
87.
4.
21.
3431.
15.
3561.
0.
165.
133419.
292.
43.
0.
32.
421.
4.
5519.
5.
132.
138444.
292.
29.
0.
3.
1076.
2.
9637.
0.
4862.
14587.
4160.
10306.
0.
7591.
15182.
3840.
24158.
0.
3958.
83109.
6444.
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
+5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
654.
0.
58.
9215.
110.
30.
0.
1.
1268.
2.
1970.
0.
28.
32569.
123.
367.
0.
7.
8398.
25.
61.
1.
7.
1168.
9.
735
0
12
10058
42
2.
0.
1.
19.
0.
219.
0.
4.
4503.
12.
12.
0.
1.
218.
1.
*10*
*11*
*12*
14.
0.
8.
23.
6.
867.
0.
634.
1267.
330.
724.
0.
127.
2667.
192.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 3
FLCh LESS THAN OR EQUAL TC MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 001! ARS)
TOTAL NUMBER OF MANUFACTURING PI ANTS... 1777
MANUFACTURING EMPLOYMENT
FLCW IMGY)
TOTAL CAPITAL COST
TCTAL ANNUAL OE.M COST
TOTAL ANNUAL COST
CCST RANGE
> 50CCOO.
100000. TO 500000.
5000C. TO 100000.
10000. TO 500CC.
0. TO 10JOO.
*>
tn CCST RANGE
tO > 500CCOO.
1000000. TO 5000000.
5COOOO. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1* *2*
MAX 27284. 12C9.
MIN 0. 0.
AVE 1031. 29.
TOT 165010. 33712.
SO 3473. 88.
-
*1* *2*
MAX 654. 30.
MIN 0. 0.
AVE 55. 1.
TOT 8789. 1225.
SD 107. 2.
MAX! MUM
28600,
44500.
38536C96.
31C1819.
7995902.
OSM
66540320.
DISTRI
MAXIMUM
3101819.
483134.
99293.
49334.
MAXIMUM
48170112.
995335.
497428.
99938.
01 STRIBLTICN
*3* *4*
4450. 6041.
0. 0.
159. 78.
184955. 98243.
353. 336.
DISTR I8UT
*3* *4*
1970. 367.
0. 0.
27. 6.
30917. 7775.
122. 23.
MINI MU M
8.
0.
2625.
253.
586.
AVERAGE
530.
t69602.
37445.
97092.
ANNUAL COST OF WASTE T«EATMe,'4T
REPLACEMENT INTEREST
41724160. 64255184.
8UTION OF OPERATI
MINIMUM
504294.
100787.
50076.
10048.
253.
ON AND MAINTENANCE COST
AVERAGE
H71896.
215518.
69603.
20628.
4547,
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5165385. 15104768.
1012700. 2087447.
5022E5. 703142.
100387. 210553.
3281. 61894.
CF TOTAL CAPITAL
*5* *6*
87. 2492
4. 0
21. 158
3408. 128004
15. 262
ION OF ANNUAL OEM
*5* *6*
61. 432
1. 0
7. 11
1158. 9251
9. 34
COST FOR TREATMENT !$ 1000
*7* *8*
43. 3645.
0. 5.
32. 127.
42i. 133153.
4. 248.
TREATMENT COSTS (t 1000)
*7* *8*
2. US.
. 0. 0.
1. 4.
19. 4243.
0. 9.
TOTAL
1131409.
942369.
834483456.
66540320.
172532624.
TOTAL
172519664.
TOTAL
29297408.
17241440.
5289836.
9571260,
514688?.
TOTAL
453143040.
273455616.
90002192.
. 190550752.
36084288.
1
*g* *1Q*
29. 9637.
0. 0.
2. 4862.
937. 14587.
2. 4160.
*9* *10*
12. 14.
0. 0.
0. 8.
192. 23.
I. 6.
S.O.
1526.
2550.
2005718,
166944.
414300.
S.D.
720445.
102681.
13638.
9796.
2487.
S.D.
11946733.
903553.
142289.
96665.
22043.
NUMBER
25.
80.
76.
464.
1132.
NUMBER
30.
131.
128.
905.
583.
6805.
0.
5840.
11681.
1364.
578.
0.
489.
979.
126.
*12*
16799.
0.
2876.
60404.
4427.
*12*
509.
0.
94.
1971.
133.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA «EGICN 3
FLOW OF LEAST EFFICIENT TWO-THIRDS CF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS I 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1777
MANUFACTURING ECPLCYMENT
FLCW IMGYI
TCTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TCTAL ANNUAL COST
MAXIMUM
28600.
44500.
SSS'fcCSt.
3101819.
7995902.
OEM
MINIMUM
8.
c.
2625.
253.
586.
ANNUAL COST OF WASTE
REPLACEMENT
AVERAGE
637.
428.
391327.
30933.
80638.
TREATMENT
INTEREST
TOTAL
1131409.
760439.
695387648.
5496779Z.
143294528.
TOTAL
S.O.
1526.
2013.
1535538.
133866.
323224.
5496(792
34769376.
53544816.
143281984.
1*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CCST RANGE
> 50CCOO.
100000. TO
5000 C. TO
10000. TO
o. ro
4*
500CCOO.
1000000. TO
5COOOC* 50
1COOOO. TO
G, ro
500000.
100000.
50000.
10000.
5000000.
1COOOCO.
500300,
100000.
MAXIMUM
3101619.
468983.
99001.
49722.
S989.
MAX! HUH
4817C112.
4 542977.
977606.
497712,
99799.
MINIMUM
503414.
104908.
50076.
ICC12.
253.
DISTRIBUTION CF
MINIMUM
5159936.
1012700.
506890.
100145.
3281.
AVERAGE
1028242.
214093.
70430.
20733.
4381 .
INVESIHEM" REgiJlREhENTS
AVERAGE
12524472,
2025910.
693C09.
202907.
61101.
TOTAL
20564848.
15200600.
5423145.
8541911.
5243827.
TOTAL
313111808.
255265560.
88012080,
173688272.
39287888.
S.O.
643433.
93764.
14399.
10331.
2426.
S.O.
9851256.
854688.
143665.
95534.
22183.
NUMBER
20.
71.
77.
412.
1197.
NUMGER
25,
126.
127.
856.
643.
DISTKiBl .TCCN CF
*3* ¥<-,*
CAPITAL CCST FCR IHEATwENT (i 1000)
*£*
*V*
*10*
*11*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS
0.
14 C,
162^40.
298.
4555,,
0.
63.
79615.
264, .
87.
4.
20.
3295.
15.
2126*
0.
148.
119667.
239.
41.
0.
31.
40 i.
4o
3032.
5«
117.
122221.
219.
21.
0.
2.
875.
2.
7735.
0.
4 0 '•) 6 .
12107.
3208.
5660.
0,
4968.
9935.
978.
12627.
0.
2255.
47362.
3291 .
*12*
W*-X
(• IK
AVE
TOT
SD
£54,
0.
4*.
6960*
fifc.
30.
0.
1.
Li 11.
2.
197C.
0.
21.
24821.
98,
367,
0.
5.
6347,
19.
61 .
0«
7.
1 099.
9.
342.
0.
10.
8245,
29,
2.
0.
I.
17 ,
0.
90.
0.
4»
3786.
8.
8.
0.
0.
152.
I.
12.
0.
7.
,'0*
4 a
483.
0.
418.
835.
92.
366.
0.
i 5.
1567.
100.
SC OP
REPRESENTS STANDARD OEVIAUfN. THE DATA CISTKlBUTICN USED iS HIGHLY SKt'^ED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS..,
EPA REGION 4
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
2337
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
36000.
86263.
67004336.
3125120.
101*19546.
MINIMUM
7.
4.
1252«.
852.
2957.
AVERAGE
514.
768.
494900.
31383.
94242.
TOTAL
1201376.
1795232.
1156582UOO.
7331*1104.
220242464.
S.D.
1176.
1*237.
2668366.
138627.
466290.
OSM
73341104.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
57829104.
89056800.
TOTAL
220227008.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*2*
MAXIMUM
3125120.
492097.
98149.
49678.
9988.
MAXIMUM
83755408.
4956188.
997063.
499217.
99888.
MINIMUM
502207.
100263.
50933.
10004.
852.
AVERAGE
1086153.
211792.
69714.
19971.
5016.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5125247.
1007640.
500552.
100153.
15655.
AVERAGE
18094080.
2060261.
688523.
221577.
68684.
TOTAL
29326144.
17366976.
5577105.
13759869.
7318356.
TOTAL
669481216.
296677632.
116360320.
328820992.
34547952.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *lj* *5* *6* *7* *8* *9*
*10*
S.D.
624987.
94804.
13741.
9574.
2392.
S.D.
19587184.
1110821.
139575.
98049.
22085.
NUMBER
27.
82.
80.
689.
1459.
NUMBER
37.
144.
169.
1484.
503.
*11*
*12*
MAX
MIN
AVE
TOT
SD
37601.
0.
978.
98744.
5295.
4064.
1.
24.
32954.
128.
2841.
0.
117.
146626.
199.
21509.
0.
119.
195762.
842.
266.
6.
24.
6913.
22.
8209.
0.
218.
276101.
467.
66.
0.
39.
1362.
10.
6640.
6.
157.
263246.
433.
21.
0.
3.
1553.
3.
2519.
0.
2233.
4466.
405.
12402.
0.
7026.
63236.
2955.
26321.
0.
5477.
65730.
9646.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
#5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
482.
0.
27.
2705.
71.
50.
0.
1.
1035.
2.
982.
0.
13.
15984.
44.
695.
0.
6.
9412.
27.
503.
1.
12.
3425.
34.
2045.
0.
20.
24872.
83.
8.
0.
2.
86.
2.
335.
0.
5.
8128.
18.
8.
0.
1.
293.
1.
*10*
. 5.
0.
4.
8.
1.
*11*
1015.
0.
582.
5235.
233.
*12*
881.
0.
180.
2161.
315.
SD
OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 4
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TCTAL NUMBER OF MANUFACTURING PLANTS... 2337
FLCW (MGY»
TOTAL CAPITAL COST
TOTAL ANNUAL OEM
TCTAL ANNUAL COST
CCST RANGE
> 500000.
100000. TO 500000.
50000. TO
10000. TO
Q. TO
CCST RANGE
> 5000000.
1C 00000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO
MAX
MIN
AVE
TOT
SD
*1*
37601.
0.
•570.
97969.
5296.
KPLQYMEN
QST
« COST
5T
MAXIMUM
IT 36000.
81468.
67004336.
3125120.
10419546.
OEM
5S141936.
MINIMUM
7.
4.
12524.
718.
2574.
ANNUAL COST OF hASTE
REPLACEMENT
48997232.
AVERAGE
514.
550.
419317.
25307.
78566.
TREATMENT
INTEREST
75455696.
TOTAL
1201376.
1286442.
979944704.
59141936.
183608640.
TOTAL
183594864
DISTRIBUTION CF OPERATION AND MAINTENANCE COST
000.
300.
000.
000.
MAXIMUM
3125120.
485575.
98445.
49985.
SS70.
MINIMUM
506185.
100338.
50691.
10041.
718.
AVERAGE
1097019.
226429.
70840.
19701.
4833.
TOTAL
18649328.
15623588.
5383870.
11899166.
7593022.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
000.
000.
000.
000.
*2*
4064.
1.
22.
30307.
128.
MAXIMUM
83755408.
4956188.
986104.
498866.
99651.
DISTRIBUTION
*3* *4*
2841. 21509.
0. 0.
105. 86.
131186. 140689.
191. 658.
MINIMUM
5195718.
1004533.
500314.
100393.
15655.
OF TOTAL CAPITAL COST
*5* *6*
266. 8209.
6. 0.
22. 189.
6378. 238504.
20. 389.
AVERAGE
17974992.
2004616.
688282.
217072.
68210.
TOTAL
503300096.
270623232.
102554048.
306939392.
41676144.
FOR TREATMENT IS 1000)
*7* »8*
63. 6039.
0. 6.
37. 131.
1304. 220076.
8. 329.
*9* *10*
20. 2519.
0. 0.
3. 2233.
1282. 4466.
2. 405.
S.O.
1176.
2969.
2406405.
116010.
410709.
S.O.
682115.
106367.
15266.
9510.
2365.
S.O.
2095931?.
1140895.
135422.
97542.
2180P.
*11*
8183.
0.
4698.
42281.
1925.
NUMBER
17.
69.
76,
604.
1571.
NUMBER
28.
135.
149.
1414.
611.
26321.
0.
5452.
65421.
9657,
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS <$ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
482.
0.
26.
2648.
71.
50.
0.
1.
974.
2.
982.
0.
11.
13913.
43.
695.
0.
4.
7186.
22.
503.
1.
10.
2964.
33.
2045.
0.
15.
19112.
71.
8.
0.
2.
76.
1.
335.
0.
4.
6356.
13.
5.
0.
0.
222.
1.
5.
0.
4.
8.
1.
*11*
677.
0.
393.
3536.
154.
*12*
881.
0.
179.
2m.
315.
SO OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHL* SKEWED.
-------
EPA REGION 4
FLOH CF LE.'ST EFFICIENT T^C-IHUROS CF WATER USE REGIONS HOCIF560
196B FLOW CONtIT SONS ( 1967 OOLLARTt
IOTAL r^UMBER OF MANUFACTURING PLANTS..,. 2337
MANUFACTURING EMPLOYMENT
FLCW (PGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OtM COST
TCTAL ANNUAL COST
MAXIMUM
36000-
650S3.
64726384,
2604477.
10O9Q902.
MINIMUM'
7,
3*
9 ^53 e
19P7-
AVEPAGF
409,
3'-?755.
19877.
63-iiI,.
TOTAL
1201376.
955785.
801019136.
46451728,
2261,
6
ANNUAL COST V*- VsASTE
RF.PLACFMENT
4*451723.
P-'TtT f.5!
61676*32*
TOT*.L
CGST RANGE
> 50CCCO.
100000. TO
5000C. TO
10000. TO
0. TO
500000.
100000.
500CC.
10JOO.
Oi CCST RANGE
CD > 5000COO.
1COOOOO. TO 5000000,
5COOOO. TO 1000300.
ICOOOO. TO 500000.
0. TO 100000.
*1*
*2*
DISTRlGifTtCN GF OPERATION AND M«!
MAXIMUM
260*477.
450110.
99137.
^9752,
?9<57,
MAXIMUM
80907968.
47T5635.
993066.
497712.
99930.
MINIMUM
5 06 198 a
101472.
5223C>»
tOO 12.
606,
DISTRIBUTION Cf
MINIMUM
5454358^
1007220*
503460.
100218.
11566.
ft'-'ERAGE
J0232270
' 216486.
69902,
.19237,
':-V87-
INfESTMENT RE-TJ IREH^NTS
AVERAGE
17097344.
2070232,
695954,
21259Q.
S6335*
TOTAL
13301948«
12123203*
3704828.
9637698.
769121*.
TOTAL
3761*1824.
201593424.
98129552.
272965376.
52603584.
S.D,
60B';07»
98S03.
J.3%82..
9493.
t3i'- .
S*D«
18501008,
1104052.
144560.
96537.
21735*
f-j; ' «', n i;
1 1
5 t
??.
? f; J
1 n--.-
f!"?4?f:
22-
97.
1*1. •
128*.
79 ?»
DISTRI8UTSGN CF TOT.*l CSPITAL COST FOR TREATMENT <$ 10001
*8* *9*
*10*
*11*
DISTRIBUTION OF ANNUAL Ott> TPEATPEKT COSTS «$ 1000)
*1*
*2*
*3*
*9*
*10*
*?.?*
MAX
WIN
AVE
TOT
SO
35206.
0«
677.
68399.
4007.
3465.
1.
17,
24018.
108.
2288.
0.
84.
105883.
154.
17450.
0.
£5.
105957.
522.
220.
5,
18.
•5249.
16.
7299.
0.
165.
208846*
338.
57.
0.
34.
11 80.
7.
5269.
*.
110.
185018.
273.
12.
0.
2.
1035.
2.
2022.
0.
1616.
3632.
291.
68HO.
0.
3907,
35165.
1601.
25800,
Oa
4728.
56736.
8535.
*12*
PAX
MIN
AVE
TOT
SD
472.
0.
21.
2076.
61.
42.
0.
1.
853,
1.
672,
0.
8.
10132.
32.
574.
0.
3.
5489 =
18.
356,
0.
7.
2039.
23.
17I7»
0.
12.
15584.
59.
6.
0.
2.
60.
1.
271.
0.
3.
5219.
10*
3,
0.
0*
165.
0.
4.
0.
4.
7.
1.
565.
0.
328.
295*.
128.
864.
0*
157,
1879.
282.
SB OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
EPA REGION 5
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
3942
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
20500.
961(35.
150539616.
6808742.
25927248.
MINIMUM
5.
0.
3339.
304.
728.
AVERAGE
717.
537.
491377.
42689.
105050.
TOTAL
2826983.
2115082.
1937006848.
168280960.
414108928.
S.D.
1590.
3252.
3688041.
224396.
682837.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
168280960.
96850336.
11*911(9440.
TOTAL
414280704.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION
MAXIMUM MINIMUM
6808742. 505230.
486195. 100704.
99775. 50403.
49789. 10008.
9996. 304.
AND MAINTENANCE COST
AVERAGE
1639100.
188443.
70320.
21040.
5285.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
188174512.
4788263.
998590.
498629.
99947.
MINIMUM
5044770.
1005192.
501016.
100093.
4174.
AVERAGE
25276352.
1939575.
703951.
215778.
66973.
TOTAL
65564016.
41269120.
17931568.
33937664.
9592289.
TOTAL
1036330496.
576054016.
247086880.
499095296.
62954912.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *u* *5* *6* *7* *8* *9*
*10*
S.D.
1490760.
82234.
13749.
10317.
2560.
S.D.
37876416.
898515.
141226.
97730.
21446.
*11*
NUMBER
40.
219.
255.
1613.
1815.
NUMBER
41.
297.
351.
2313.
940.
*12*
MAX
MIN
AVE
TOT
SD
127753.
0.
1898.
521828.
10783.
2354.
0.
28.
80957.
100.
8050.
0.
164.
453625.
374.
10028.
0.
77.
224815.
393.
432.
5.
25-.
7847.
32.
2445.
0.
178.
266855.
231.
83.
0.
36.
765.
12.
7343.
6.
141.
257787.
289.
44.
0.
4.
5685.
4.
7323.
0.
5858.
11717.
2071.
5293.
0.
3445.
17227.
1283.
16737.
0.
2000.
87996.
3112.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O£M TREATMENT COSTS ($ 1000)
*ll* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
1363.
0.
59.
16299.
159.
59.
0.
1.
3590.
2.
4390.
0.
30.
81911.
162.
813.
0.
7.
21799.
31.
1309.
1.
17.
5275.
79.
524
0
15
22696
31
*10*
*11*
*12*
16.
0.
3.
54.
3.
538.
1.
5.
9689.
16.
30.
0.
1.
1738.
2.
13.
0.
10.
21.
3.
520.
0.
356.
1782.
132.
607.
0.
78.
3422.
114.
SD OR S.D. REPRESENTS STANDARD DEVIATION.
THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 5
FLCH LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TCTAL NUMBER OF MANUFACTURING PLANTS... 3942
MAXIMUM
MANUFACTURING EMPLOYMENT 20500.
FLOW (MGYI
TOTAL CAPITAL COST
TCTAL ANNUAL OEM COST
TCTAL ANNUAL COST
81138.
55021232.
3813776.
10486918.
OEM
132474960.
MINIMUM
5.
0.
3339.
304.
728.
ANNUAL COST OF HASTE
REPLACEMENT
73615648.
AVERAGE
717.
420.
373494.
33606.
81004.
TREATMENT
INTEREST
113368064.
TOTAL
2826983.
1654067.
1472313344.
132474960.
319316992.
TOTAL
319458560.
S.D.
1590.
2301.
1803012.
155743.
378976.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CCST RANGE
> 500000.
100000. TO 5000CO.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
MAXIMUM
3813776.
486195.
99528.
49894.
9994.
MINIMUM
507291.
100360.
50403.
10002.
304.
AVERAGE
1354744.
180212.
70643.
20509.
5147.
TOTAL
47416048.
32257984.
13987406.
27584208.
11245479.
S.O.
894173.
75979.
13935.
10194.
2421.
NUMBER
35.
179.
198.
1345.
2185.
^, DISTRIBUTION OF INVESTMENT REQUIREMENTS
tn COST RANGE
03 > 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1* *2*
MAX 37230. 1642.
MIN 0. 0.
AVE 907. 22.
TOT 249362. 63637.
SC 3966. 74.
MAXIMUM
68776528.
4832921.
994919.
498980.
9S985.
DISTRIBUTION
*3* *4*
5265. 8192.
0. 0.
133. 59.
367916. 171717.
289. 279.
MINIMUM
5044770.
1003880.
505899.
100093.
4174.
OF TOTAL CAPITAL COST
*5* *6*
412. 2445.
5. 0.
25. 166.
7595. 249706.
30. 230.
AVERAGE
16097293.
1907436.
708915.
203768.
67294.
TOTAL
627794432.
495933440.
199205200.
435249152.
82502016.
S.D.
15696684.
899163.
143733.
94631.
21380.
NUMBER
39.
260.
281.
2136.
1226.
FOR TREATMENT ($ 1000)
*7» *8*
81. 6869.
0. 6.
36. 133.
761. 243267.
12. 270.
*9* *10*
35. 7323.
0. 0.
3. 5858.
4386. 11717,
3. 2071.
*ll* *12*
5293. 15949.
0. 0.
3445. 1936.
17227. 85182.
1283. 2963.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL 0£M TREATMENT COSTS It 1000»
*5» *6* *7* *8* *9*
MAX
P IN
AVE
TOT
SD
797.
0.
46.
12621.
109.
36.
0.
I.
3051.
2.
2428.
0.
21.
59286.
106.
452.
0.
6.
16449.
21.
1202.
1.
16.
4908.
73.
524.
0.
14.
20890.
31.
15.
0.
2.
52.
3.
484.
1.
5.
8911.
14.
18
0
1
1188
1
*10*
*il*
*12*
13.
0.
10.
21.
3.
520.
0.
356.
1782.
132.
560.
0.
75.
3318.
108.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 5
FLOW CF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1S68 FLOW CONDITIONS » 1967 OOLLARSI
TCTAL NUMBER OF MANUFACTURING PLANTS... 3942
FLOW (MGYI
TCTAL CAPITAL COST
TOTAL ANNUAL OEM
TCTAL ANNUAL COST
CCST RANGE
> 500000.
100000. TO 500000.
50000. TO
10000. TO
0. TO
VI COST RANGE
CO > 5000000.
1000000. TO 5000000.
500000. TO 10000CO.
100000. TO 500000.
0. TO
MAX
M IN
AVE
TCT
SO
0.
467.
128468.
1871.
MPLCYMEK
OST
M COST
ST
MAXIMUM
if 20500.
35015.
29633344.
2767396.
653C82S.
OEM
103222624.
MINIMUM
5.
0.
2673.
283.
622.
ANNUAL CCST OF WASTE
REPLACEMENT
58033120.
DISTRIBUTION OF OPERATION
000.
DOO.
000.
000.
MAXIMUM
2767396.
486345.
9SS84.
49924.
9993.
MINIMUM
511689.
100740.
50084.
10027.
283.
AVERAGE
717.
318.
294435.
26185.
63590.
TREATMENT
INTEREST
85370976.
AND MAINTENANCE COST
AVERAGE
1093012.
181023.
71465.
20351.
4808.
TOTAL
2826983.
1254653.
1160662784.
103222624.
250670528.
TOTAL
250626720
TOTAL
31697360.
25343152.
11720307.
22426848.
12053185.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
000.
oco.
000.
000.
*2*
1105.
0.
17.
49297.
55.
MAXIMUM
37041680.
4777005.
996617.
496442.
99842.
DISTRIBUTION
#3* *4*
4164. 3834.
0. 0.
108. 45.
298663. 131048.
225. 194.
MINIMUM
51169C8.
1001477.
503251.
100058.
3342.
AVERAGE
12834330.
1933291.
708608.
196522.
64521.
TOTAL
372195584.
434990592.
170066000.
374374656.
99556192.
OF TOTAL CAPITAL COST FOR TREATMENT (* 10001
*5* *6*
276. 2445.
5. 0.
20. 155.
6345. 231782.
21. 226.
*7* *8*
73. 3870.
0. 5.
35. 117.
726. 213644.
10. 220.
*q* *io*
28. 5878.
0. 0.
2. 4702.
3501. 9404.
3. 1662.
S.O.
1590.
1502.
1089989.
110999.
245719.
S.O.
587165.
7S388.
13903.
10157.
2380.
S.D.
8082810.
910210.
14718C.
93078.
21382.
NUMBER
29.
140.
164.
1102.
2507.
NUMBER
29.
225.
240.
1905.
1543.
*11*
5293.
0.
3445.
17227.
1283.
*12*
11988.
0.
1609.
70806.
2227.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS l» 10001
*5* *6* *7* ' *8* *9*
MAX
MIN
AVE
TCT
SO
592.
0.
34.
9329.
80.
27.
0.
1.
2628.
1.
1749.
0.
16.
43179.
76.
327.
0.
4.
12650.
15.
577.
1.
10.
3142.
36.
524
0
13
19189
30
*10*
*11*
*12*
11.
0.
2.
45.
2.
202.
0.
4.
7609.
9.
14.
0.
1.
870.
1.
11.
0.
9.
18.
3.
520.
0.
356.
1782.
132.
439.
0.
63.
2784.
82.
SD OR S.D. REPRESENTS STANDARD CEV1ATICN. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS.. ,
EPA REGION 6
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
1168
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
12600.
469987.
1007273981,
13023192.
140946944.
MINIMUM
5.
1.
6625.
1275.
AVERAGE
385.
2204.
2165136.
100373.
375299.
TOTAL
449901 .
2574679.
2528879616.
117235088.
1*38349056.
S.D.
777.
16038.
29987968.
486124.
4240858.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
117235088.
126443968.
194723632.
TOTAL
438402560.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
*1*
MAX 933376.
MIN 0.
AVE 8159.
TOT 1378881.
SD 72108.
*2*
MAXIMUM
13023192.
481396.
99383.
49549.
9958.
MAXIMUM
1259092480.
4989713.
997248.
496428.
99979.
MINIMUM
501852.
103202.
50758.
10004.
433.
AVERAGE
1481451.
245464.
71977.
21558.
4677.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5063841. 36776160.
1001198. 2292695.
503597. 668384.
100121. 208005.
8281. 64727.
TOTAL
72591136.
29701200.
5902091.
6079441.
2965231.
TOTAL
2647884288.
320977408.
60822976.
109618848.
21877824.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* i *9*
*10*
S.D.
1885683.
109904.
12996.
10810.
2377.
S.D.
147750720.
1163236.
132579.
94926.
21658.
NUMBER
49.
121.
82.
282.
634.
NUMBER
72.
140.
91.
527.
338.
*11*
5127.
0.
79.
57873.
272.
11186.
0.
303.
202106.
678.
38936.
0.
299.
242163.
1722.
765.
3.
54.
10150.
94.
4678
0
273
127279
525
*12*
74.
0.
58.
520.
9.
17886.
9.
307.
216024.
1038.
30.
0.
3.
648.
3.
10770.
0.
6136.
24546.
3543.
14316.
0.
8492.
16984.
8237.
24581.
0.
3357.
251745.
4861.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
1458.
0.
72.
12102.
148.
76.
0.
2.
1269.
4.
3696.
0.
56.
37153.
192.
1390.
0.
16.
12586.
64.
3944.
0.
97.
18290.
346.
827
0
29
13478
81
16.
0.
8.
69.
4.
2459.
0.
15.
10859.
104.
11.
0.
1.
139.
1.
*10*
*11*
*12*
15,
0.
9.
36.
5.
1420.
0.
816.
1633.
853.
911.
0.
128.
9622.
182.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 6
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1168
FLOW (MGY)
TOTAL CAPITAL COST
TCTAL ANNUAL OEM
TOTAL ANNUAL COST
CCST RANGE
> 500000.
100000. TO 500000.
50000. TO
10000. TO
0. TO
05 CCST RANGE
t-» > 500COOO.
1COOOOO. TO 5000000.
500000. TO 1000000.
100000. TO
0. TO
MAX
HIM
AVE
TOT
SO
24662.
0.
634.
107105.
2398.
MPLGYMEN
3ST
"I COST
ST
300.
000.
300.
300.
MAXIMUM
IT 12600.
75127.
41570496.
2527266.
7806717.
06M
500904S6.
DISTR
MAXIMUM
2527266.
490134.
96023.
49156.
9993.
MINIMUM
5.
1.
4296.
324.
869.
ANNUAL COST OF WASTE
REPLACEMENT
36986288.
IBUTION OF OPERATION
MINIMUM
584607.
101186.
50024.
10004.
324.
AVERAGE
385.
696.
633327.
42886.
123324.
TREATMENT
INTEREST
56958830.
AND MAINTENANCE COST
AVERAGE
988634.
210026.
69174.
20826.
4500.
TOTAL
449901.
813341.
739726080.
50090496.
144042976.
TOTAL
144035664
TOTAL
15818137.
20162480.
4565502.
6497741.
3050877.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
000.
000.
000.
000.
*2*
1305.
0.
37.
27328.
102.
MAXIMUM
51963120.
4989713.
991593.
496428.
99979.
DISTRIBLTION
*3* *4*
3376. S994.
0. 0.
155. 105.
103324. 852C8.
253. 494.-
MINIMUM
5063841.
1002662.
500739.
100438.
5370.
AVERAGE
12364570.
2250621.
721480.
206631.
63797.
TOTAL
469853696.
258821456.
57718384.
113853488.
24497888.
Of TOTAL CAPITAL COST FOR TREATMENT 1$ 1000)
*5* *6*
335. 3273.
3. 0.
30. 211.
5688. 98726.
42. 381.
*7* *8*
45. 5502.
0. 9.
38. 165.
338. 116078.
5. 404.
*9* *10*
15. 6946.
0. 0.
2. 4310.
573. 17241.
2. 1887.
S.D.
777.
3305.
2355551.
141979.
436396.
S.O.
534176.
103082.
14227.
10092.
2329.
S.O.
10719716.
1081779.
150643.
95661.
21669.
NUMBER
16.
96.
66.
312.
678.
NUMBER
38.
115.
80.
551.
384.
*11*
9453.
0.
6060.
12120.
4798.
*12*
15244.
0.
2214.
166049.
3134.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL 0£M TREATMENT COSTS (* 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SO
322.
0.
31.
5260.
54.
18.
0.
1.
786.
2.
702.
0.
20.
13218.
50.
317.
0.
6.
5146.
20.
872.
0.
25.
4816.
79.
525.
0.
20.
9186.
56.
4.
0.
2.
22.
1.
346.
0.
6.
3945.
19.
5
0
0
113
1
*10*
11.
0.
7.
27.
3.
*11*
947.
0.
580.
1160.
519.
*12*
563.
0.
86.
6414.
118.
SC OR S.O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 6
FLOW CF LEAST EFFICIENT TWO-THIRDS OF HATER USE REGIONS MODIFIED
1S68 FLOW CONDITIONS « 1967 DOLLARS!
TCTAL NUMBER OF MANUFACTURING PLANTS... 1168
MANUFACTURING EMPLOYMENT
FLOW 500000.
1COOOO. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000.
10000.
MAXIMUM
1592842.
491766.
9S285.
49969.
9882.
MINIMUM
615914.
102196.
50817.
10095.
290.
AVERAGE
878698.
218928.
73689.
21261.
4223.
TOTAL
7029585.
14668183.
4421315.
5995737.
3171523.
S.O.
346573.
108744.
14378.
10610.
2290.
NUMBER
8.
67.
60.
282.
751.
*>•
Oi COST RANGE
t\3 > 500CCCO.
1000000. TO 5000000.
500000. TO 10000CO.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
28002016.
48095C8.
999554.
499571.
99937.
MINIMUM
5028106.
1014334.
500238.
100019.
4346.
AVERAGE
10019261.
2185664.
703424.
207467.
62042.
TOTAL
270520064.
216380752.
49943120.
103111280.
29408064.
S.D.
6628265.
1019817.
144202.
101377.
22474.
NUMBER
27.
99.
71.
497.
474.
DISTRIBUTION OF TOTAL CAPITAL COST FCR TREATMENT (t 1000)
*1*
*2*
*3*
*4*
*5*
*7*
*8*
*9*
*10*
*11*
*12*
MAX
MIN
AVE
TCT
SO
6429.
G.
289.
48918.
901.
873.
0.
27.
19849.
74.
1902.
0.
114.
76251.
170.
7536.
0.
70.
56605.
339.
224.
3.
23.
4269.
27.
2793.
0.
185.
86351.
331.
41.
0.
34.
305.
4.
4210.
8.
126.
88596.
283.
14.
0.
2.
487.
2.
5668.
0.
3483.
13931.
1558.
7862.
0.
5112.
10223.
3889.
11458.
0.
1729.
129690.
236B.
*1*
*2*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS <$ 1000)
*6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
221.
0.
21.
3597.
37.
12.
0.
1.
648.
1.
376.
0.
13.
8467.
31.
245.
0.
4.
3559.
14.
418.
0.
14.
2553.
38.
431
0
16
7504
45
*10*
*il*
*12*
3.
0.
2.
18.
1.
173.
0.
4.
2805.
11.
4.
0.
0.
90.
0.
9.
0.
6.
23.
3.
791.
0.
490.
980.
426.
427.
0.
67.
5042.
90.
SC CR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
EPA REGION 7
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
676
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
jj.,, COST RANGE
O5 > 5000000.
CO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*2*
MAXIMUM
38000.
11233.
6487405.
934050.
1757950.
O6M
14758060.
MINIMUM
5.
0.
1766.
248.
472.
ANNUAL COST OF WASTE
REPLACEMENT
9115850.
DISTRIBUTION OF OPERATION
MAXIMUM
934050.
386960.
93440.
48284.
9902.
MINIMUM
934050.
101396.
50012.
10011.
248.
AVERAGE
562.
284.
269700.
21831.
56081.
TREATMENT
INTEREST
14038403.
AND MAINTENANCE COST
AVERAGE
934050.
165622.
67114.
22544.
4866.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
8109256.
4500546.
996108.
494909.
99701.
MINIMUM
5266615.
1009335.
502534.
100142.
2207,
AVERAGE
7141856.
1902274.
719259.
215134.
63036.
TOTAL
380053.
191659.
182317024.
14758060.
37910560.
TOTAL
37912304.
TOTAL
934050.
4306161.
2416092.
5252803.
1849078.
TOTAL
21425568.
74188720.
38839968.
80460000.
12985404.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
2663.
0.
164.
655'4.
453.
423.
0.
24.
9921.
47.
1794.
0.
117.
44425.
157.
1078.
0.
38.
15160.
103.
137.
3.
24.
3169.
18.
1266.
0.
158.
36094.
201.
42.
0.
36.
323.
5.
1433.
6.
113.
45739.
162.
37
0
5
1113
6
*10*
0.
0.
0.
0.
0.
S.D.
1804.
714.
540694.
51101.
116195.
S.D.
0.
83122.
13960.
10974.
2407.
S.D.
1624308.
951632.
153999.
102403.
22569.
NUMBER
1.
26.
36.
233.
380.
NUMBER
3.
39.
54.
374.
206.
*11*
0.
0.
0.
0.
0.
*12*
4620.
0.
1101.
19820.
1074.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*I4* *5* *6* *7* *8* *9*
213.
0.
18.
737.
36.
11.
0.
1.
402.
1.
576.
0.
14.
5352.
38.
108.
0.
4.
1456.
8.
146.
0.
12.
1629.
18.
135
0
11
2576
19
4.
0.
2.
21.
1.
46.
0.
4.
1474.
5.
15.
0.
1.
300.
2.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
180.
0.
45.
812.
42.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 7
FLOW LESS THAN OR EQUAL TO MEDIAN CF WATER USE REGIONS
Tr,TA v 1968 FLOW CONDITIONS < 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 676
MANUFACTURING EMPLOYMENT
FLCW (fGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TOTAL ANNUAL COST
CCST RANGE
> 50COOO.
100000. TO
50000. TO
10000. TO
0. TO
500000.
looaoo.
5COCO.
10000.
CD CCST RANGE
*> > 5000COO.
1COOOOO. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AYE
TOT
SO
*1*
1925.
0.
129.
5169.
330.
*2*
361.
0.
20.
8309.
MAXIMUM
38000.
9075.
5186667.
774778.
1433484.
06M
12410536.
MINIMUM
5.
0.
1766.
248.
472.
ANNUAL COST OF WASTE
REPLACEMENT
7927149.
AVERAGE
562.
229.
234531.
18359.
48142.
TREATMENT
INTEREST
12207805.
TOTAL
380053.
155064.
158543008.
12410536.
32543664.
TOTAL
32545472.
DISTRIBUTION OF OPERATICN AND MAINTENANCE COST
MAXIMUM
774778.
386960.
91086.
47866.
9842.
MINIMUM
774778.
100160.
50727.
10045.
248.
AVERAGE
774778.
165980.
68531.
21875.
4649.
TOTAL
774778.
2821665.
2330045.
4550084.
1934083.
DISTRIBUTION CF INVESTMENT REQUIREMENTS
MAXIMUM
6483333.
3854667.
986690.
499856.
999C8.
DISTRIBUTION
*3* *4*
1566. 674.
0. 0.
104. 32.
39531. 12469.
138. 84.
MINIMUM
5266615.
1005819.
502534.
100303.
2207.
OF TOTAL CAPITAL COST
*5* *6*
137. 1055.
3. 0.
22. 141.
2828. 32227.
17. 181.
AVERAGE
5942240.
1826346.
683797.
210376.
64184.
FOR TREATMENT ($ 1000)
#7* *8*
41. 1433.
0. 6.
36. 97.
320. 39371.
5. 145.
TOTAL
17826720.
60269424.
32822256.
70896784.
16366940.
*9*< *10*
30. 0.
0. 0.
4. 0.
912. 0.
5. 0.
s.o.
1804.
603.
459782.
42966.
98278.
S.D.
0.
81937.
12416.
10394.
2375.
S.O.
619438.
816195.
159526.
98210.
225SO.
*11*
0.
0.
0.
0.
0.
NUM-BER
1.
17.
34.
208.
416.
NUMBER
3.
33.
48.
337.
255.
. *12*
3580.
0.
967.
17407.
835.
*2*
*3*
DISTRIBUTION OF ANNUAL OCM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
179.
0.
16.
645.
30.
10.
0.
" 1.
361.
1.
475.
0.
12.
4444.
31.
89.
0.
3.
1207.
6.
146.
0.
10.
1350.
17.
114
0
9
2169
16
3.
0.
2.
20.
1.
46.
0.
3.
1266.
4.
11.
0.
I.
229.
2.
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
141.
0.
40.
720.
33.
SD
OR S.'O. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 7
FLOW CF LEAST EFFICIENT TWO-THIRDS Of WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 676
MANUFACTURING EMPLOYMENT
FLCH
TOTAL CAPITAL COST
TCTAL ANNUAL OSM COST
TCTAL ANNUAL COST
MAXIMUM
38000.
6320.
3629454.
5647C8.
1025*49.
MINIMUM
5.
0.
1766.
248.
472.
AVERAGE
562.
165.
191852.
14232.
38595.
TOTAL
380053.
111719.
129691616.
9620715.
26090064.
S.O.
1804.
388.
342913.
30386.
71542.
OSM
ANNUAL COST OF HASTE TREATMENT
REPLACEMENT INTEREST
9620715.
6484580.
9986249.
TOTAL
26091536.
CCST RANGE
> 50CCOO.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000.
10JOO.
O5 CCST RANGE
CJ1 > 500CCOO.
1COOOOC. TO 5000000.
50000C. TO 1000000.
1COOOO. TO 500000.
0. TO 100JOO.
*1*
MAXIMUM
5647C8.
202366.
97056.
46426.
9921.
MAXIMUM
0.
4536817.
986690.
494153.
99403.
MINIMUM
564708.
108113.
52632.
10044.
248.
AVERAGE
564708.
137148.
69625.
21516.
4353.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
1032301. 1935204.
504808. 721100.
100410. 205226.
2207. 61372.
TOTAL
564708.
1371478.
1740616.
3958867.
1985173.
TOTAL
0.
52250512.
28122896.
63209472.
18534368.
DISTRIBUTION CF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* «6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
1133.
0.
86.
3428.
190.
276.
0.
16.
6479.
31.
1244.
0.
86.
32761.
104.
612.
0.
22.
6724.
52..
96.
3.
19.
2462.
14.
860.
0.
119.
27349.
147.
38.
0.
34.
305.
4.
864.
5.
79.
32093.
no.
25.
0.
3.
746.
4.
*10*
0.
0.
0.
0.
0.
S.O.
0.
36846.
15149.
9870.
2404.
S.D.
0.
95C091.
164108.
94779.
22133.
*11*
0.
0.
0.
0.
0.
NUMBER
1.
10.
25.
184.
456.
NUMBER
0.
27.
39.
308.
302.
*12*
26S1.
0.
853.
15346.
654.
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS (S 1000)
*6* *7* *8* *9*
MAX
MIN
AVE
TOT
sc
133.
0.
13.
516.
23.
8.
0.
1.
318.
1.
343.
0.
9.
3278.
21.
64.
0.
2.
900.
4.
76.
0.
8.
1038.
11.
96.
0.
7.
1702.
12.
3.
0.
2.
18.
1.
26.
0.
3.
1038.
3.
8
0
1
173
1
*10*
0.
0.
0.
0.
0.
*ll*
0.
0.
0.
0.
0.
*12*
107.
0.
36.
640.
26.
SD OR S.D. REPRESENTS STANDARD DEVIATICN. THE CATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
EPA REGION 8
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
235
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
,£, COST RANGE
CTJ > 5000000.
O 1000000. TQ 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
6569.
0.
560.
12873.
13U7.
*2*
624.
1.
57.
8234.
98.
MAXIMUM
7500.
20529,
14344988.
1643703.
3199011.
O6M
13582640.
MINIMUM
3.
3.
12200.
782.
2331.
ANNUAL COST OF WASTE
REPLACEMENT
8401280.
DISTRIBUTION OF OPERATION
MAXIMUM
1643703.
437354.
99476.
47869.
9965.
MINIMUM
674226.
101267.
50305.
10434.
782.
AVERAGE
354.
738.
715003.
57798.
148601.
TREATMENT
INTEREST
12937966.
AND MAINTENANCE COST
AVERAGE
1097520.
212020.
71588,
21596.
4936.
TOTAL
83096.
173520.
168025616.
13582640.
34921280.
TOTAL
34921872
TOTAL
3292560.
6360599.
2147630.
1209352.
572540.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
17931232.
4650511.
917923.
493401.
99648.
DISTRIBUTION
*3* *((*
2483. 3919.
0. 0.
179. 165.
22703. 22321.
306. 418.
MINIMUM
5074037.
1022620.
503804.
100792.
15251.
AVERAGE
9040242.
2230782.
685914.
206020.
59966.
TOTAL
63281696.
113769888.
7545050.
21838128.
3597937.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
136. 2080.
7. 0.
29. 371.
1055. 31174.
26. 426.
*7* *8*
35. 2911.
0. 8.
31. 185.
92. 28260.
4. 318.
*9* *10*
32. 6137.
0. 0.
5. 6137.
226. 6137.
6. 0.
S.D.
791.
2119.
1561321.
146728.
336396.
S.D.
496284.
76943.
15252.
10606.
2656.
S.D.
5416430.
1149473.
154991.
92498.
22294.
NUMBER
3.
30.
30.
56.
116.
NUMBER
7.
51.
11.
106.
60.
*11*
5434.
0.
5434.
5434.
0.
*12*
3088.
0.
1736.
29515.
866.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O£M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
363.
0.
50.
1155.
75.
18.
0.
2.
236.
2.
1027.
0.
32.
4127.
105.
192.
0.
12.
1568.
24.
175.
1.
20.
724.
39.
220
0
36
3019
51
2.
0.
2.
5.
0.
91.
1.
6.
929.
11.
11.
0.
1.
56.
2.
*10*
*12*
10.
0.
10.
10.
0.
533.
0.
533.
533.
0.
130.
0.
72.
1220.
36.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 8
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TCTAL NUMBER OF MANUFACTURING PLANTS... 235
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TCTAL CAPITAL COST
TCTAL ANNUAL 0£M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 500COOO.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
5483.
0.
432.
9928.
1123.
*2*
575.
1.
46.
6654.
82.
MAXIMUM
7500.
18395.
10703240.
1492168.
2851479.
OEM
10493356.
MINIMUM
3.
3.
12200.
782.
2331.
ANNUAL COST OF WASTE
REPLACEMENT
6478538.
AVERAGE
354.
531.
551365.
44653.
114674.
TREATMENT
[NTEREST
9976944.
TOTAL
83096.
124765.
129570768.
10493356.
26948384.
TOTAL
26948832
OISTRIBUT[QN OF OPERATION AND MAINTENANCE COST
MAXIMUM
1492168.
476877.
83695.
48237.
9738.
MINIMUM
526845.
101267.
50485.
10022.
782.
AVERAGE
1009506.
179479.
65380.
22882.
4407.
TOTAL
2019012.
5204891.
1372973.
1350065.
546456.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
1337905C.
4591495.
974062.
483989.
99648.
DISTRIBUTION
*3* *4*
2314. 16-99.
0. 0.
152. 114.
19261. 15387.
264. 250.
MINIMUM
5577258.
1022620.
565460.
101853.
15251.
OF TOTAL CAPITAL COST
*5* *6*
136. 1301.
7. 0.
25. 303.
927. 25483.
25. 334.
AVERAGE
9584757.
2231393.
833127.
198354.
59754.
FOR TREATMENT ($ 1000)
*7* *8*
35. 1688.
0. 8.
31. 145.
92. 22213.
4. 233.
TOTAL
28754272.
93718512.
15829415.
19240304.
4421828.
*9* *10*
24. 3014.
0. 0.
4. 3014.
173. 3014.
5. 0.
S.O.
791.
1581.
1125039.
118950.
255886.
*11*
3150.
0.
3150.
3150.
0.
S.D.
682587.
86024.
10214.
11787.
2466.
S.O.
3905273.
996192.
128999.
96160.
23008.
*12*
2393.
0.
1370.
23289.
650.
NUMBER
2.
29.
21.
59.
124.
NUMBER
3.
42.
19.
97.
74.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL 0£M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TCT
SO
332.
0.
41.
953.
68.
16.
0.
1.
206.
2.
930.
0.
26.
3265.
90.
174.
0.
9.
1165.
18.
175.
1.
17.
623.
38.
147
0
27
2230
37
2.
0.
2.
5.
0.
51.
1.
5.
721.
8.
7.
0.
1.
39.
1.
*10*
6.
0.
6.
6.
0.
*11*
313.
0.
313.
313.
0.
*12*
101.
0.
57.
970.
27.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 8
FLOW CF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1S68 FLOW CONDITIONS ( 1967 DOLLARS)
TCTAL NUMBER OF MANUFACTURING PLANTS... 235
MANUFACTURING EMPLOYMENT
FLCW (KCY)
TCTAL CAPITAL COST
TOTAL ANNUAL OEM COST
TCTAL ANNUAL COST
MAXIMUM
7500.
12810.
7040471.
1085523.
1979662.
MINIMUM
3.
3.
12200.
782.
2331.
AVERAGE
354.
397.
4350C7.
34335.
89581.
TOTAL
83096.
93185.
102226544.
8068838.
21051472.
S.O.
791.
1217.
852305.
90228.
193003.
ANNUAL COST OF hASTE
OCM REPLACEMENT
8066638. 5111326.
TREATMENT
INTEREST
7871440.
TOTAL
21051600.
CCST RANGE
> 50CCCO.
1COOOO. TO
50000. TO
10000. TO
C. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
5000CO.
100000.
500CO.
10JOO.
O5 CCST RANGE
OS > 5000COO.
1000000. TO 50000CC.
5COOOO. TO 1000000.
10000C. TO 500000.
0. TO 100000.
*1*
MAXIMUM
1085523.
437354.
96163.
48084.
9626.
MAXIMUM
8800588.
3728195.
966439.
420555.
98227.
MINIMUM
1085523.
102845.
50485.
10046.
782.
AVERAGE
1085523.
174986.
72506.
22502.
4099.
DISTRIBUTION CF INVESTMENT REQUIREMENTS
MINIMUM
5577258.
1002785.
535361.
100369.
15251.
AVERAGE
7465765.
1892388.
746449.
174780.
58179.
DISTRIBUTION CF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
TOTAL
1085523.
3674709.
1450126.
1305101.
553426.
TOTAL
22397296.
68125984.
17168336.
15031055.
5061599.
*3*
*4*
*5*
*7*
*8*
*9*
*10*
S.D.
0.
102771.
15728.
11251.
2374.
S.D.
1681512.
692826.
99373.
76209.
23226.
NUMBER
1.
21.
20.
58.
135.
NUMBER
3.
36.
23.
86.
87.
*12*
MAX
f IN
AVE
TOT
SD
3071.
0.
274.
6309.
637.
439.
1.
36.
5190.
£4.
1835.
0.
123.
15639.
215.
1281.
0.
83.
11269.
186.
136.
6.
22.
831.
25.
1110.
0.
253.
21286.
275.
32.
0.
30.
90.
3.
1470.
6.
121.
18462.
203.
19.
0.
3.
143.
4.
2419.
0.
2419.
2419.
0.
2620.
0.
2620.
2620.
0.
1799.
. 0.
1057.
17970.
476.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL G£K TREATMENT COSTS (t 1000)
*4* *5* *6* *7* *8* *9*
MAX
MtN
AVE
TCT
SD
246.
0.
32.
726.
51.
13.
0.
1.
175.
1.
671.
0.
19.
2392.
66.
126.
0.
6.
871.
14.
175.
1.
15.
552.
38.
108
0
20
1701
27
2.
0.
2.
5.
0.
51.
1.
4.
597.
7.
6.
0.
1.
30.
1.
*10*
*ll*
*12*
5.
0.
5.
5.
0.
261.
0.
261.
261.
0.
77.
0.
44.
754.
20.
SD OR S.O. REPRESENTS STANDARD CfcVIATICN. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
EPA REGION 9
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
1142
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000*. TO 500000.
50000. TO
10000. TO
0. TO
100000.
50000.
10000.
,£, COST RANGE
OJ > 5000000.
tO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
3674.
0.
180.
14947.
485.
*2*
378.
0.
21.
16364.
37.
MAXIMUM
22000.
11521.
14700979.
787954.
2603061.
OSM
30482704.
MINIMUM
4.
0.
2353.
292.
591.
ANNUAL COST OF WASTE
REPLACEMENT
20269712.
DISTRIBUTION OF OPERATION
MAXIMUM
787954.
489468.
99660.
49574.
9966.
MINIMUM
525777.
101716.
50187.
10075.
292.
AVERAGE
5U3.
315.
354986.
26692.
71781.
TREATMENT
INTEREST
31215344.
AND MAINTENANCE COST
AVERAGE
647157.
191054.
68985.
22391.
5280.
TOTAL
620575.
359816.
405394432.
30482704.
81974128.
TOTAL
81967760
TOTAL
2588628.
8215314.
6622571.
10188132.
2872327.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
18376208.
4895670.
982193.
499478.
99290.
DISTRIBUTION
*3* *4*
2111. 1037.
0. 0.
132. 44.
87134. 33948.
169. 97.
MINIMUM
5681357.
1001374.
503048.
100153.
2941.
AVERAGE
9413730.
1856954.
689729.
235452.
64333.
TOTAL
56482384.
183838512.
104838816.
144096640.
17562832,
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
164. 1471.
5. 0.
27. 199.
2970. 101425.
23. 200.
*7* *8*
43. 1806.
0. 11.
37. 142.
262. 94034.
4. 170.
*9* *10*
12. 1960.
0. 0.
3. 1715.
803. 3430.
2. 346.
S.D.
1311.
755.
742204.
55845.
S.D.
134395.
84634.
14775.
10329.
2410.
S.D.
5110830.
938039.
130933.
107321.
21015.
NUMBER
4.
43.
96.
455.
544.
NUMBER
6.
99.
152.
612.
273.
*11*
0.
0.
0.
0.
0.
*12*
9541.
0.
2089.
50127.
2208.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
183.
0.
19.
1601.
30.
7.
0.
1.
773.
1.
678.
0.
16.
10541.
38.
104.
0.
4.
3274.
8.
197.
1.
13.
1464.
25.
170
0
15
7628
23
3.
0.
2,
14.
0.
62.
1.
5.
3029.
5.
4.
0.
1.
180.
1 .
*10*
4.
0.
4.
8.
1 .
*11*
0.
0.
0.
0.
0.
*12*
364.
0.
82.
1974.
84.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 9
FLOW LESS THAN OR EQUAL TO MEDIAN CF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MAN'tf AC TUR ING PLANTS... 1142
MANUFACTURING EMPLOYMENT
FLOW (MGYI
TOTAL CAPITAL COST
TOTAL ANNUAL 0£f CCST
TCTAL ANNUAL COST
COST RANGE
> 50COOO.
100000. TO
50000. TO
10030. TO
0. TO
500000.
100000.
50JOO.
10300.
-J CCST RANGE
O > 500COOO.
1CCOOOO. TO 5000000.
5COOOO. TO 1000000.
100000. TO 5000CO.
0. TO 100000.
MAX
MIN
AVE
TOT
SO
3674.
0.
180.
14947.
485.
*2*
346.
0.
20.
15302.
35.
MAXIMUM
22000.
11521.
147CCS79.
787954.
2603061.
0£M
27327792.
DISTR
MAXIMUM
787954.
489468.
99113.
49574.
9966.
MINIMUM
4.
0.
2353.
292.
591.
ANNUAL COST OF HASTE
REPLACEMENT
18445872.
AVERAGE
543.
272.
323045.
23930.
64962.
TREATMENT
INTEREST
28406640.
I8UTION OF OPERATION AND MAINTENANCE COST
MINIMUM
525777.
102360.
50092.
10009.
292.
AVERAGE
647157.
194142.
67624.
21283.
5014.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
183762C8.
4895670.
992309.
4976«8.
99290.
DISTRIBUTION
*3* *4*
2111. 1037.
0. 0.
123. 38.
81355. 29148.
165. 91.
MINIMUM
5681357.
1012156.
501252.
100153.
2941.
CF TOTAL CAPITAL COST
*5* *6*
164. 1351.
5. 0.
26. 174.
2846. 88727.
24. 187.
AVERAGE
9413730.
1888641.
692798.
227121.
63467.
FOR TREATMENT ($ 1000)
*7* *8*
43. 1806.
0. 11.
37. 124.
262. 82077.
4. 162.
TOTAL
620575.
310963.
368917760.
27327792.
74186560.
TOTAL
74180304.
TOTAL
2588628.
7571552.
5004204.
9194070.
2973136.
TOTAL
56482384.
160534512.
82443008.
142404800.
19357520.
*10*
I960.
0.
1715.
3430.
346.
12.
0.
2.
745.
2.
S.D.
1341.
733.
732502.
54933.
143414.
S.D.
134395.
86396.
14126.
10498.
2364.
S.D.
5110830.
960439.
137532.
104556.
21122.
0.
0.
0.
0.
0.
NUMBER
4.
39.
74.
432.
593.
NUMBER
6.
85.
119.
627.
305.
*12*
9541.
0.
2089.
50127.
2208.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS <$ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
183.
0.
19.
1601.
30.
7.
0.
1.
746.
1.
678.
0.
15.
9605.
37.
104.
0.
4.
2830.
7.
197.
1.
13.
1399.
25.
163.
0.
12.
6344.
21.
3.
0.
2.
14.
0.
62.
1.
4.
2647.
5.
4
0
1
163
1
*10*
4.
0.
4.
8.
1.
*11*
0.
0.
0.
0.
0.
*12*
364.
0.
82.
1974.
84.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 9
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS I 1967 DOLLARS)
TCTAL NUMBER OF MANUFACTURING PLANTS... 11*2
MANUFACTURING EMPLCYMENT
FLCW JHGY)
TOTAL CAPITAL COST
TCTAL ANNUAL OtM CCST
TOTAL ANNUAL COST
CCST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
C. TO
500000.
100000.
50000.
10000.
CCST RANGE
> 500CCCO.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
KIN
AVE
TOT
SO
3674.
0.
156.
1296*.
473.
*2*
254.
0.
16.
12227.
28.
MAXIMUM
22COO.
5895.
147CC979.
736C39.
2603C61.
06M
21560976.
OISTR
MAXIMUM
736039.
489468.
99802.
49CC9.
9991.
MINIMUM
4.
0.
2353.
292.
591.
ANNUAL COST Of WASTE
REPLACEMENT
15658251.
IBUTICN OF OPERATION
M I M MU M
538860.
100659.
50005.
10057.
292.
AVERAGE
543.
197.
274225.
18880.
53710.
TREATMENT
INTEREST
24113696.
AND MAINTENANCE COST
AVERAGE
637449.
184741.
65965.
20228.
4877.
TOTAL
620575.
225428.
313165056.
21560976.
61336544.
TOTAL
61332912
TOTAL
1274898.
6281192.
2902478.
7807867.
3297152.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
183762C6.
4895670.
977296.
499246.
99663.
DISTRIBUTION
*3* *4*
1376. 529.
0. 0.
1C1. 28.
67164. 21419.
131. 62.
MINIMUM
5681357.
1013609.
501252.
100153.
2941.
AVERAGE
9899625.
1847167.
703431.
220639.
64127.
CF TOTAL CAPITAL COST FCR TREATMENT ($ 1000
*5* *6*
110. 1097.
4. 0.
20. 150.
2203. 76442.
16. 159.
*7* *8*
43. 1018.
0. 7.
37. 100.
262. 66317.
4. 120.
TOTAL
49498128.
121913040.
61901920.
134148384.
24047744.
I
*9* *10*
10. 1960.
0. 0.
2. 1715.
643. 3430.
2. 346.
S.D.
1341.
489.
684647.
44386.
128566.
S.O.
139431.
86765.
14185.
9689.
2421.
S.O.
5556985.
863325.
135093.
101986.
22933.
NUMBER
2.
34.
44.
386.
676.
NUMBER
5.
66.
88.
608.
375.
*11*
0.
0.
0.
0.
0.
*12*
9541.
0.
2C89.
50127.
2208.
*1*
*2*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS ($ 10001
*4« *5* *6* * 7* *8* *9*
MAX
WIN
AVE
TOT
SO
183.
0.
17.
1413.
30.
7.
0.
1.
668.
1.
370.
0.
11.
7141.
26.
57.
0.
3.
2U5.
5.
95.
0.
7.
826.
12.
130.
0.
10.
5081.
17.
3.
0.
2.
14.
0.
29.
1.
3.
2142.
4.
4.
0.
0.
132.
0.
*10*
4.
0.
4.
8.
1.
*11*
0.
0.
0.
0.
0.
*12*
364.
0.
82.
1974.
84.
SC CR S.C. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
EPA REGION 10
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
a it a
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
31000.
105627.
529074(40.
3956620.
10675863.
MINIMUM
15.
6.
22206.
1434.
4264.
AVERAGE
465.
1906.
1256638.
91974.
251570.
TOTAL
206291.
846099.
557947392.
40836320.
111697056.
S.D.
1670.
8914.
4246614.
336167.
867395.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
40836320.
27897360.
42961920.
TOTAL
111695600.
COST RANGE
> 500000.
100000. TO
0. TO
500000.
50000. TO 100000.
10000. TO 50000.
10000,
£» COST RANGE
5000000.
tO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
3956620. 538955. 1579836.
452282. 101703. 194045.
97956. 52723. 68257.
49874. 10046. 25976.
9791. 1434. 5345.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE
66134288. 5136670. 20670352.
4959988. 1041225. 2021941.
999361. 508154. 722201.
497758. 100886. 253786.
99104. 27758. 70837.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT <$ 1000)
*3* *4* *5* *6* *7* *8* '
TOTAL
22117712.
9120120.
2866775.
6182204.
550530.
TOTAL
392736768.
153667552.
107607984.
40605808.
2833487.
S.D.
1119073.
97069.
13923.
10526.
2175.
S.D.
16631610.
1018832.
133750.
117577.
21316.
NUMBER
14.
47.
42.
238.
103.
NUMBER
19.
76.
149.
160.
40.
*11*
*12*
MAX
MIN
AVE
TOT
SD
953.
0.
161.
2417.
248.
269.
1.
35.
6737.
49.
1763.
0.
213.
28548.
281.
21838.
0.
438.
123408.
1973.
109.
6.
27.
850.
21.
6101.
0.
460.
135700.
704.
60.
0.
53.
105.
11.
8930.
18.
380.
133591.
890.
18.
0.
4.
213.
3.
11110.
0.
8287.
41434.
2896.
16679.
0.
8399.
75587.
4528.
2657.
0.
1338.
9368.
703.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS <$ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
130.
0.
23.
341.
33.
8.
0.
1.
246.
1.
539.
0.
35.
4703.
73.
687.
0.
22.
6106.
69.
85.
1,
13.
412.
20.
1882.
0.
52.
15485.
155.
*10*
*11*
*12*
5.
0.
4.
8.
2.
565.
1.
15.
5271.
52.
8.
0.
1.
51.
1.
17.
0.
13.
67.
4.
1735.
0.
863.
7766.
479.
108.
0.
55.
383.
28.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
EPA REGION 10
FLOW LESS THAN OR EQUAL TC MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TCTAL IVUMBER OF MANUFACTURING PLANIS... 444
MANUFACTURING EMPLOYMENT
FLCH (HGY)
TOTAL CAPITAL COST
TOTAL ANNUAL CUM COST
TCTAL ANNUAL COST
MAXIMUM
31000.
45250.
27730240.
2068368.
5590107.
MINIMUM
15.
4.
18786.
1189.
3585.
AVERAGE
465.
833.
715001.
4910-5.
139913.
TOTAL
206291.
369964.
317460480.
21802656.
62121440.
S.O.
1670.
3821.
2252825.
174021.
456950.
OtM
21802(56.
ANNUAL COST OF fcASTE TREATMENT
REPLACEMENT INTEREST
15873C23.
24444432.
TOTAL
62120096.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
CCST RANGE
> 50COOO.
1COOOO. TO 500000.
5000C. TC 100000.
10000. TO 500CO.
0. TO 10000.
£>>
CCST RANGE
> 500CCOO.
1COOOOO. TO 50000CO.
500000. TO 1000000.
100000. TO 5000CC.
0. TO 100000.
*1*
*2*
MAXIMUM
2068368.
423465.
98924.
49855.
9S68.
MAXIMUM
34662800.
4385741.
933277.
490012.
98016.
MINIMUM
574512.
104642.
50137.
10020.
1189.
AVERAGE
1087280.
188107.
77478.
19336.
5680.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
6671221. 13664084.
1039375. 2072193.
500127. 681307.
101129. 275227.
23483. 64976.
TOTAL
9785525.
5078900.
1936961.
4002540.
999638.
TOTAL
191297184.
87032144.
42241040.
72109392.
4158439.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT
-------
EPA REGION 10
FLOW CF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 OOLLARSI
TOTAL NUMBER OF MANUFACTURING PLANTS... 444
MANUFACTURING EMPLOYMENT
FLOW 500COO.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
CCST RANGE
> 5000COO.
1COOOOO. TO 5000000.
500000. TO 1000000.
1COOOO. TO 500000.
0. TO 100000.
MX
PIN
AVE
TCT
SO
*l*
371.
0.
95.
1425.
106.
*2*
148.
1.
20.
3862.
28.
MAXIMUM
31CCO.
33981.
22402384.
1668232.
4513334.
G£M
17668928.
MINIMUM
15.
3.
16220.
1014.
3086.
ANNUAL COST OF WASTE
REPLACEMENT
13386492.
AVERAGE
465.
638.
602995.
39795.
116374.
TREATMENT
INTEREST
20615184.
TOTAL
206291.
283289.
267729872.
17668928.
5167C272.
TOTAL
51670592,
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
1668232.
46ec<;i.
89950.
4EC79.
9968.
MINIMUM
560223.
102812.
53030.
10020.
1014.
AVERAGE
924841.
178815.
70460.
18829.
5530.
TOTAL
7398725.
4112740.
1620584.
3370332.
1166900.
DISTRIBUTION CF INVESTMENT REQUIREMENTS
MAXIMUM
28002976.
4385741.
990183.
490C69.
96961.
DISTRIBUTION
*3* *4*
785. 7141.
0. 0.
121. 146.
16162. 41038.
150. 445.
MINIMUM
5409001.
1039375.
500791.
100429.
20275.
CF TOTAL CAPITAL COST
*5* *6*
65. 3256.
6. 0.
18. 255.
584. 75278.
13. 377.
AVERAGE
11108321.
1846699.
678171.
277710.
65616.
FOR TREATMENT ($ 1000)
*7* *8*
45. 4307.
0. 10.
39. 190.
78. 67031.
8. 429.
TOTAL
155516496.
70174592.
33230368.
69705280.
6036708.
*9* *10*
, 9. 4380.
0. 0.
2. 32fc7.
129. 16336.
2. 1142.
S.D.
1670.
2869.
1828658. -
139745.
369683.
s.o.
447337.
88732.
11233.
8829.
2780.
S.O.
7041109.
722012.
129865.
107549.
22041.
NUMBER
8.
23.
23.
179.
211.
NUMBER
14.
38.
49.
251.
92.
*ll*
8040.
0.
4049.
36438.
2183.
*12*
2657.
0.
1338.
9368.
703.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OEM TREATMENT COSTS <$ 1000J
*5* *6* *7* *8* *9*
PAX
MIN
AVE
rot
so
54.
0.
16.
240.
17.
5.
0.
1.
179.
1.
171.
0.
15.
2005.
29.
248.
0.
8.
2262.
25.
31.
1.
6.
198.
8.
740.
0.
21.
6332.
61.
*10*
2.
0.
2.
4.
I.
185.
1.
6.
2197.
17.
3.
0.
0.
25.
1.
8.
0.
7.
33.
2.
851.
0.
423.
3810.
235.
108.
0.
55.
383.
28.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
INDUSTRIAL WATER USE REGION
SUMMARIES FOR MANUFACTURING
475
-------
Industrial Water Use Regional Tables
tf
Each table summarizes aggregated manufacturing conditions for one of the
industrial water use regions defined by the Bureau of the Census (cf.
maps). There are three sets of tables, each calculated on the basis of
a separate level of observed efficiency of industrial water use.
The first set of regional tables presents treatment costs calculated on
the basis of industrial water use reported for 1968. The second set of
tables' costs reflect the use of "median or below" water use data, that
is, in each SIC group all regional values below the efficiency of the
group median are assumed to be equal to the median. The third set of
costs occurs when for each SIC group all regional values below the effi-
ciency of the most efficient third are made equal to the lowest regional
efficiency among the most efficient third.
476
-------
INDUSTRIAL WATER USE REGIONS
«'IIKAl> OK THIS <-KM« ti
-------
CODES FOR WATER USE REGIONS
Code Region
1 New England
2 Delaware Hudson
3 Chesapeake Bay
4 Eastern Great Lakes
5 Ohio
6 Cumberland and Tennessee
7 Southeast
8 Western Great Lakes
9 Upper Mississippi
10 Lower Mississippi
11 Missouri
12 Arkansas-White and Red
13 Western Gulf
14 Colorado
15 Great Basin
16 California
17 Pacific Northwest
478
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
WATER USE REGION 1
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
1167
MANUFACTURING EMPLOYMENT
FLOW 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
US COST RANGE
5000000.
CO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE TOTAL
1232981. 542816. 9023U8. 4511742.
478572. 106556. 186392. 5778138.
96176. 50W90. 70539. 3244797.
46529. 10056. 18743, 6522658.
9996. 273. 4426. 3261954.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE TOTAL
28239696. 5538211. 16128292. 112898048.
4357301. 1013167. 1932261. 141055072.
990903. 516472. 689462. 57914784.
493215. 100083. 216630. 128461456.
99848. 3785. 57552. 23596432.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *«* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
805.
0.
38.
1898.
115.
279.
0.
12.
9553.
22.
1057.
0.
83.
63164.
95.
7422.
0.
63.
56999.
38B.
139.
4,
15.
1379.
17.
2871
0
201
109803
325
31.
0.
30.
60,
1.
4290.
4.
147.
97023.
341.
17.
0.
2.
808.
2.
*10*
0.
0.
0.
0.
0.
S.D.
262026.
85364.
13623.
8350.
2622.
S.E.
8414334.
926301.
131448.
101053.
24792.
NUMBER
5.
31.
46.
348.
737.
NUWBER
7.
73.
84.
593.
410.
*11*
8009.
0.
5841.
29205.
1770.
*12*
1237.
0.
1237.
1237.
0.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OgM TREATMENT COSTS ($ 1000)
*H* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
56.
0.
5.
248.
9.
5.
0.
1.
518.
0.
174.
0.
7.
4997.
12.
187.
0.
3.
3163.
11.
152.
0.
5.
511.
16.
367.
0.
16.
8523.
36.
1.
0.
1.
2.
0.
131.
0.
4.
2789.
10.
8.
0.
1.
180.
1.
*10*
0.
0.
0.
0.
0.
*11*
620.
0.
470.
2348.
129.
*12*
39.
0.
39.
39.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 1
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1167
OO
o
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
26000.
38463.
22591760.
1232981.
4102133.
O6M
22271920.
MINIMUM
4.
0.
3028.
273.
670.
ANNUAL COST OF WASTE
REPLACEMENT
17981824.
DISTRIBUTION OF OPERATION
MAXIMUM
1232981.
478572.
96176.
49718.
9943.
MINIMUM
542816.
102258.
50490.
10009.
273.
AVERAGE
619.
381.
308172.
19085.
58230.
TREATMENT
INTEREST
27692000.
AND MAINTENANCE COST
AVERAGE
902348.
186677.
71066.
18431.
4452.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
28239696.
4357301.
989594.
493215.
99848.
MINIMUM
5538211.
1013167.
500541.
100476.
3785.
AVERAGE
16128292.
1956311.
686787.
208916.
58992.
TOTAL
721838.
444360.
359636736.
22271920.
67954432.
TOTAL
67945744.
TOTAL
4511742.
5600300.
3126886.
5529257.
3507845.
TOTAL
112898048.
136941776.
54256144.
119709088.
25838400.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*(»* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
805.
0.
36.
1816.
114.
279.
0.
11.
8859.
21.
1057.
0.
77.
58612.
91.
7422.
0.
61.
55522.
388.
139.
4.
14.
1362.
17.
2871
0
197
107737
325
31.
0.
30.
60.
1.
4290.
4.
143.
94961.
341.
14.
0.
2.
708.
2.
*10*
0.
0.
0.
0.
0.
S.E.
1337.
1985.
1164761.
69053.
216165.
S.E.
262026.
87254.
14330.
8088.
2544.
S.E.
8414334.
934415.
138550.
99279.
25080.
NUMBER
5.
30.
44.
300.
788.
NUMBER
7.
70.
79.
573.
438.
*11*
8009.
0.
5841.
29205.
1770.
*12*
860.
0.
860.
860.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
56.
0.
5.
232.
9.
5.
0.
1.
495.
0.
174.
0.
6.
4433.
11.
187.
0.
3.
3004.
11.
152.
0.
5.
497.
16.
367.
0.
15.
8355.
36.
1.
0.
1.
2.
0.
131.
0.
4.
2734.
10.
5.
0.
0.
148.
1.
*10*
0.
0.
0.
0.
0.
. *11*
620.
0.
470.
2348.
129.
*12*
28,
0.
28.
28.
0.
SD
OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 1
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1167
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
26000.
28884.
18275888.
995540.
3316577.
06M
19096064.
MINIMUM
4.
0.
3028.
273.
670.
ANNUAL COST OF WASTE
REPLACEMENT
15810072.
DISTRIBUTION OF OPERATION
MAXIMUM
995540.
425565.
97433.
48829.
9943.
MINIMUM
673024.
100503.
50490.
10076.
273.
AVERAGE
619.
303.
270952.
16363.
50778.
TREATMENT
INTEREST
24347488.
AND MAINTENANCE COST
AVERAGE
802768.
181166.
70691.
18932.
4387.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
22844848.
3828667.
989122.
495920.
99848.
MINIMUM
5538211.
1013167.
502827.
100122.
3785.
AVERAGE
13246217.
1813605.
703886.
205309.
59157.
TOTAL
721838.
353531.
316201472.
1909606U.
59257936.
TOTAL
59253616.
TOTAL
3211071.
4529153,
2615552.
5092646.
3649983.
TOTAL
92723520.
10700270U.
54199184.
113535824.
27862992.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *ti* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
805.
0.
36.
1784.
114.
279.
0.
11.
8428.
21.
1057.
0.
73.
55760.
90.
5596.
0.
49.
44398.
294.
139.
4.
14.
1355.
17.
2450.
0.
175.
95469.
277.
31.
0.
30.
60.
1.
3568.
4.
126.
83414.
286.
14.
0.
2.
644.
2.
*10*
0.
0.
0.
0.
0.
S.D.
1337.
1501.
952838.
56294.
176566.
S.E.
155431.
92671.
14525.
8848.
2493.
S.D.
6580989.
783444.
149609.
97658.
24506.
NUMBER
4.
25.
37.
269.
832.
NUMBER
7.
59.
77.
553.
471.
*11*
6662.
0.
4858.
24290.
1472.
*12*
647.
0.
647.
647.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*[(* #5* *6* *7* *8* *9*
56.
0.
5.
225.
9.
5.
0.
1.
478.
0.
174.
0.
5.
4116.
11.
144
0
3
2510
9
152.
0.
5.
492.
16.
290.
0.
13.
6826.
29.
1.
0.
1.
2.
0.
100.
0.
4.
2335.
8.
5.
0.
0.
130.
0,
*10*
0.
0.
0.
0.
0.
*11*
518.
0.
392.
1962.
108.
*12*
21.
0.
21.
21.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS..,
WATER USE REGION 2
FLQW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
1743
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
** COST RANGE
OO > 5000000.
1C 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
36300.
33622.
52425024.
1546250.
8204226.
OSM
37229904.
MINIMUM
3.
0.
1721.
20.
238.
ANNUAL COST OF WASTE
REPLACEMENT
32873392.
DISTRIBUTION OF OPERATION
MAXIMUM
1546250.
499543*
98079.
49749.
9997.
MINIMUM
555945.
107140.
50076.
10001.
20.
AVERAGE
538.
274.
377205.
21360.
69271.
TREATMENT
INTEREST
50624992.
AND MAINTENANCE COST
AVERAGE
938248.
210501.
67058.
21044.
4869.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
65531280.
3960036.
963821.
497958.
99972.
MINIMUM
5300970.
1012700.
500009.
100448.
2152.
AVERAGE
18634864.
1888713.
681688.
223295.
63981.
TOTAL
937824.
477841.
657467904.
37229904.
120739792.
TOTAL
120728288.
TOTAL
7505981.
9051529.
3419939.
12058050.
5200173.
TOTAL
279523072.
162429376.
128157296.
222625152.
29239280.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *(»* *5* *6* *7* *8* *9*
*10*
MAX
MIN
AVE
TOT
SD
24744.
0.
404.
66603.
2407.
954.
0.
18.
21639.
49.
2231.
0.
121.
133871.
184.
7529.
0.
43.
56990.
249.
101.
5.
20.
4401.
13.
3087
0
165
133866
246
S.E.
1469.
1212.
1895329.
77255.
313129.
S.E.
416976.
103135.
14100.
9890.
2501.
S.E.
17827664.
766735.
130671.
100246.
23654.
NUMBER
8.
43.
51.
573.
1068.
NUMBER
15.
86.
188.
997.
457.
*11*
*12*
49.
0.
41.
203,
5.
4557.
4.
115.
119032.
215.
31.
0.
3.
1214.
3.
2050.
0.
2036.
4071.
21.
8508.
0.
8508.
8508.
0.
24158.
0.
6697.
107158.
6943.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*i»* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
390.
0.
16.
2654.
48,
12.
0.
1.
917.
1.
422,
0.
11.
12536.
32.
211.
0.
3.
4046.
9.
64.
0.
6.
1228.
7.
388
0
10
8257
27
3.
0.
2.
9.
1.
147.
0.
3.
3263.
6.
14.
0.
1.
237.
1,
*10*
4.
0.
4.
8.
0.
*11*
725.
0.
725.
725.
0.
*12*
724.
0.
210.
3354.
208.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHIY SKEWED.
-------
WATER USE REGION 2
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS { 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1743
*»
CO
CO
MANUFACTURING
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
1000000. TO 5000000
500000. TO 1000000
100000. TO
0. TO
MAX
MIN
AVE
TOT
SD
*1*
11095.
0.
212.
35019.
1098.
IPLOYMEN'
1ST
1 COST
IT
MAXIMUM
I 36300.
33622.
30403136.
1420058.
4921994.
OSM
33437920.
MINIMUM
3.
0.
1721.
20.
238.
ANNUAL COST OF WASTE
REPLACEMENT
28671264.
DISTRIBUTION OF OPERATION
)00.
DOO.
300.
000.
MAXIMUM
1420058.
434288.
98079.
49334.
9997.
MINIMUM
555945.
100192.
50076.
10001.
20.
AVERAGE
538.
247.
328988.
19184.
60972.
TREATMENT
INTEREST
44153728.
AND MAINTENANCE COST
AVERAGE
820818.
188275.
67787.
21062.
4839.
TOTAL
937824.
430810.
573425408.
33437920.
106274048.
TOTAL
106262912
TOTAL
5745726.
7907535.
3050414.
11373458.
5366590.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
000.
000.
000.
000.
*2*
954.
0.
17.
20535.
47.
MAXIMUM
38003920.
4211310.
963821.
497958.
99972.
DISTRIBUTION
*3* *4*
1793. 7529.
0. 0.
113. 40.
124354. 52745.
158. 245.
MINIMUM
5165385.
1012700.
507642.
100448.
2152.
AVERAGE
14663249.
1834006.
689535.
218009.
64072.
TOTAL
190622240.
157724576.
120668656.
217790736,
30113808.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
101. 3087.
5. 0.
20. 162.
4353. 131190.
13. 245.
*7* *8*
49. 4557.
0. 4.
41. ' 113.
203. 116846. 1
5. 215.
*9* *10*
29. 2050.
0. 0.
3. 2036.
172. 4071.
3. 21.
S.D.
1469.
1098.
1272966.
63639.
221996.
S.D.
328603.
86110.
13740.
9906.
2467.
S.D.
10904073.
756040.
132176.
99796.
23653.
*11*
8508.
0.
8508.
8508.
0.
NUMBER
7.
42.
45.
540.
1109.
NUMBER
13.
86.
175.
999.
470.
*12*
16799.
0.
4657.
74517.
4828.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*H* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
266.
0.
13.
2101.
34.
12.
0.
1.
893.
1.
422.
0.
10.
10969.
26.
211.
0.
3.
3704.
9.
64.
0.
6.
1202.
7.
388
0
10
8051
27
3.
0.
2.
9.
1.
147.
0.
3.
3201.
6.
12.
0.
1.
223.
1.
*10*
4.
0.
4.
8.
0.
*11*
725.
0.
725.
725.
0.
*12*
509.
0.
147.
2356.
146.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 2
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1743
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
IfN COST RANGE
CO > 5000000.
*» 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
6082.
0.
139.
23009.
621.
*2*
954.
0.
16.
19019.
46.
MAXIMUM
36300.
33622.
23681296.
1420058.
4427581.
OSM
30166400.
MINIMUM
3.
0.
1721.
20.
238.
ANNUAL COST OF WASTE
REPLACEMENT
25728592.
DISTRIBUTION OF OPERATION
MAXIMUM
1420058.
434288.
98395.
49332.
9996.
MINIMUM
555945.
101529.
50076.
10021.
20.
AVERAGE
538.
224.
295222.
17307.
54806.
TREATMENT
INTEREST
" 39622016.
AND MAINTENANCE COST
AVERAGE
781246.
184907.
68944.
21029.
4634.
TOTAL
937824.
389992.
514572032.
30166400.
95527552.
TOTAL
95517008
TOTAL
4687474.
7026478.
3033519.
9946495.
5477954.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
29601616.
4747541.
963821.
497958.
99968.
DISTRIBUTION
*3* *4*
1793. 7529.
0. 0.
104. 37.
115019. 49173.
145. 243.
MINIMUM
6493532.
1012700.
507642.
100351.
2152.
AVERAGE
14056694.
1876008.
691091.
207404.
64012.
TOTAL
140566944.
157584736.
113338880.
197863760.
33990512.
OF TOTAL CAPITAL COST FOR TREATMENT {$ 1000)
*5* *6*
101. 3087.
5. 0.
19. 153.
4186. 123923.
13. 245.
*7* *8*
49. 4557.
0. 4.
41. 107.
*9* *10*
22. 2050.
0. 0.
2. 2036.
203. 110488. 1046. 4071.
5. 214.
3. 21.
S.E.
1469.
1055.
1025332.
57423.
185113.
s n
324979.
85190.
15134.
10149.
2394.
S.E.
8391324.
851522.
132573.
97052.
23489.
*11*
8508.
0.
8508.
8508.
0.
NUMBER
6.
38.
44.
473.
1182.
NUMBER
10.
84.
164.
954.
531.
*12*
12627.
0.
3501.
56011.
3629.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*i»* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
197.
0.
11.
1795.
27.
12.
0.
1.
852.
1.
422.
0.
9.
9744.
24.
211.
0.
3.
3380.
9.
64.
0.
5.
1135.
7.
388
0
9
7520
27
3.
0.
2.
9.
1.
147.
0.
3.
3030.
6.
8.
0.
0.
188.
1.
*10*
4.
0.
4.
8.
0.
*11*
725.
0.
725.
725.
0.
*12*
386.
0.
112.
1785.
111.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
WATER USE REGION 3
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
769
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
28000.
44500.
38536096.
3101819.
7995902.
MINIMUM
8.
4.
11935.
679.
2606.
AVERAGE
581.
406.
336971,
24560.
67354.
TOTAL
447107.
312341.
259130432.
188867814.
51795312.
S.C.
1391.
2128.
1578018.
123858.
322955.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
18886784.
12956520.
19953021.
TOTAL
51796320.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000,
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
3101819. 557865. 1464809.
483134. 106809. 205514.
99322. 50393, 69417.
44525. 10090. 19276.
9966. 679. 4301.
MAXIMUM
48170112.
4608797.
995335.
492392.
99047.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5117148.
1081411.
506890.
101235.
14919.
AVERAGE
15684997.
2121491.
664742.
213304.
58191.
TOTAL
4394429.
5959907.
2429594.
3970853.
2133347,
TOTAL
94109984.
103953104.
25924928.
83401744.
16526275.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
27284.
0.
982.
31424.
4809.
1209.
1.
19.
9054.
64.
4450.
0.
113.
50148.
244.
4282.
0.
66.
31173.
290.
87.
4.
19.
1582.
13.
2372
t)
165
61534
279
43.
0.
33.
390.
4.
2612.
6.
111.
54896.
241.
13.
0.
2.
438.
2.
*10*
0.
0.
0.
0.
0.
S.D.
1420448.
97932.
13498.
8913,
2557.
S.C.
16399273.
947891.
127667.
94333.
22753.
*11*
4876.
0.
4876.
4876.
0.
NUMBER
3.
29.
35.
206.
496.
NUMBER
6.
49.
39.
391.
284.
*12*
5939.
0.
2269.
13614.
1957.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
654.
0.
36.
1148.
115.
30.
0.
1.
389.
1.
1970.
0.
15.
6707.
96.
367.
0.
5.
2337.
20.
54.
1.
7.
562.
8.
377
0
13
4988
37
2.
0.
1.
17.
0.
91.
0.
4.
1769.
9.
3.
0.
1.
90.
0,
*10*
0.
0.
0.
0.
0.
*11*
400.
0.
400.
400.
0.
*12*
222.
0.
80.
480.
73.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 3
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 PLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 769
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
.«, COST RANGE
O3 > 5000000.
O9 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO. 100000.
MAX
MIN
AVE
TOT
SD
*1*
27284.
0.
944.
30217.
4809.
*2*
1209.
1.
18.
8541.
63.
MAXIMUM
28000.
44500.
38536096.
3101819.
7995902.
O6M
17911792.
MINIMUM
8.
4.
11935.
679.
2606.
ANNUAL COST OF WASTE
REPLACEMENT
12396975.
DISTRIBUTION OF OPERATION
MAXIMUM
3101819.
483134.
96038.
48571.
9966.
MINIMUM
557865.
105309.
50393.
10170.
679.
AVERAGE
581.
390.
322418.
23292.
64238.
TREATMENT
INTEREST
19091328.
AND MAINTENANCE COST
AVERAGE
1464809.
186678.
68543.
19281.
4315.
TOTAL
447107.
299801.
247939520.
17911792.
49398800.
TOTAL
49400080.
TOTAL
4394429.
5413651.
2124833.
3779049.
2200878.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
48170112.
4608797.
995335.
492392.
99864.
DISTRIBUTION
*3* *4*
4450. 4282.
0. 0.
107. 63.
47260. 29871.
237. 289.
MINIMUM
6000886.
1039183.
506890.
101235.
14919.
AVERAGE
17080592.
2121251.
687431.
209026.
58323.
TOTAL
85402960.
99698816.
26809808.
81102112.
16913744.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
87. 2372.
4. 0.
19. 163.
1575. 60797.
13. 279.
*7* *8*
43. 2612.
0. 6.
33. 110.
390. 54520.
4. 241.
*9* t *10*
13. 0.
0. 0.
2. 0.
423. 0.
2. 0.
S.D.
1391.
2118.
1555663.
122616.
319153.
S.D.
1420448.
90386.
13307.
8998.
2533.
S.D.
17833136.
1001208.
145953.
93085.
22546.
NUMBER
3.
29.
31.
196.
510.
NUMBER
5.
47.
39.
388.
290.
*11*
4876.
0.
4876.
4876.
0.
*12*
4130.
0.
1578.
9467.
1361.
*1*
*2*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS ($ 1000)
*3* *l»* *5* *6* *7* *8* *9*
3.
0.
0.
85.
0.
MAX
MIN
AVE
TOT
SD
654.
0.
34.
1074.
115.
30.
0.
1.
375.
1.
1970.
0.
14.
6182.
95.
367.
0.
5.
2206.
19.
54.
1.
7.
559.
8.
377.
0.
13.
4921.
37.
2.
0.
1.
17.
0.
91
0
4
1756
9
*10*
0.
0.
0.
0.
0.
*11*
400.
0.
400.
400.
0.
*12*
156.
0.
56.
337.
51.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 3
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 769
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
28000,
44500.
38536096.
3101819.
7995902.
MINIMUM
8.
3.
11935.
679.
2534.
AVERAGE
581.
344.
299035.
21072.
59046.
TOTAL
447107.
264268.
229958128.
16204217.
45406416.
S.C.
1391.
1969.
1517098.
119828.
311694.
OEM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
16204217.
11497905.
17706752.
TOTAL
45408864.
CO
••3
COST RANGE
> 500000,
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
*1*
*2*
MAXIMUM
3101819.
468983.
95026.
49722.
9989.
MAXIMUM
48170112.
4469382.
977606.
492392.
99035.
MINIMUM
632743.
104908.
51216.
10012.
679.
AVERAGE
1867281.
193799.
71287.
20095.
4307.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5204145.
1082563.
506890.
100264.
14919.
AVERAGE
15888953.
2106676.
698499.
202079.
57153.
TOTAL
3734562.
4651185.
1924752.
3576829.
2316970.
TOTAL
79444768.
84267056.
30035456.
76385984.
17317424.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
27284.
0.
928.
29686.
4811.
1209.
1.
17.
8147.
62.
4450.
0.
98.
43393.
233.
4282.
0.
56.
26199.
264.
87.
4.
18.
1547.
13.
2119
0
154
57273
255
41.
0.
31.
376.
4,
2291.
6.
104.
51553.
218.
13.
0.
2.
390.
2.
*10*
0.
0.
0.
0.
0.
S.E.
1745900.
93477.
13416.
10083.
2551.
S.E.
18399056.
930162.
154041.
92155.
22553.
NUMBER
2.
24.
27.
178.
538.
NUMBER
5.
40.
43.
378.
303.
*11*
4276.
0.
4276.
4276.
0.
3105.
0.
1186.
7116.
1023.
MAX
MIN
AVE
TOT
SD
*1*
654.
0.
32.
1030.
115.
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS {$ 1000)
*l»* *5* *6* ' *7* *8* *9*
30.
0.
1.
362.
1.
1970.
0.
13.
5603.
95.
367.
0.
4.
1947.
19.
54.
1.
6.
535.
8.
319.
0.
12.
4393.
32.
2.
0.
1.
16.
0.
81.
0.
3.
1635.
8.
3.
0,
0.
76.
0.
*10*
0.
0.
0.
0.
0.
*11*
352.
0.
352.
352.
0.
*12*
118.
0.
43.
255.
39.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
WATER USE REGION 4
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
1203
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
22800.
69403,,
84761504.
4721033.
15485741.
MINIMUM
15.
1.
5077.
419.
1064.
AVERAGE
788.
589.
543135.
47094.
116078.
TOTAL
947579.
708510.
653391104.
56653936.
139642016.
S.D.
1742.
3495.
3855272.
252963.
734856.
OSM
56653936.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
32669552.
50311088.
TOTAL
139634576.
CO
00
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000.
10000,
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
4721033.
486195.
98284.
49789.
9994.
MAXIMUM
105951872.
4144025.
998590.
494921.
99934.
MINIMUM
505230.
102574.
50052.
10008.
419.
AVERAGE
2197131.
201870.
68697.
21108.
5512.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5027460.
1005192.
500588.
100418.
6346.
AVERAGE
35086256.
1791937.
685019.
219130.
69371.
TOTAL
21971312.
14938380.
6388809.
10427446.
2932529.
TOTAL
385948928.
175609872.
78777232.
158869328.
17620224.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *u* *5* *6* *7* *8* *9*
*10*
MAX
MIN
AVE
TOT
SD
67387.
0.
2443.
205244.
10964.
1829.
0.
29.
27105.
109.
6450.
0.
183.
164483.
421.
7203.
0.
85.
78841.
415.
152.
5.
24.
1952.
26.
1757
0
168
76089
218
S.D.
1727563.
97227.
13162.
10538.
2517.
S.D.
38022688.
774531.
142670.
99422.
20513.
NUKBER
10.
74.
93.
494.
532.
NUKBER
11.
98.
115.
725.
254.
*11*
*12*
83.
0.
54.
161.
26.
2051.
9.
134.
67625.
246.
37.
0.
4.
1770.
4.
16948.
0.
16948.
16948.
0.
3828.
0.
3828.
3828.
0.
2236.
0.
940.
9400.
702.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
967. .
0.
65.
5445.
187.
43.
0.
1.
1200.
3.
3025.
0.
35.
31162.
185.
562.
0.
8.
7769.
35.
343.
1.
14,
1122.
42.
263
0
13
6053
27
16.
0.
7.
20.
125.
1.
5.
2481.
12.
25.
0.
1.
558.
2.
*10*
*11*
*12*
21.
0.
21.
21.
0.
442.
0.
442.
442.
0.
90.
0.
38.
380.
28.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 4
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1203
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
22800.
44147.
41332192.
3158657.
8407844.
MINIMUM
15.
1.
5071.
U19.
1063.
AVERAGE
788.
430.
386176.
35165.
84215.
TOTAL
917579.
522257.
1*64570112.
1J2303776.
101311168.
S.D.
17(42.
2314.
1966077.
171906.
417487.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
42303776.
23228496.
35771872.
TOTAL
101304144.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
KM COST RANGE
CO > 5000000.
SO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
*1*
*2*
MAXIMUM
3158657.
486195.
99501.
49381.
9972.
MAXIMUM
51665232.
4144025.
994919.
495560.
99934.
MINIMUM
596023.
100360.
50052.
10002.
419.
AVERAGE
1802083.
192548.
69537.
20632.
5450.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5027460.
1005192.
505899.
100157.
6338.
AVERAGE
19457360.
1720078.
700532.
207590.
70390.
TOTAL
14416670.
10590142.
5145747.
8624269.
3531379.
TOTAL
214031040.
137606240.
62347344.
143444672.
23369632.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *U* *5* *6* *7* *8* *9*
*10*
MAX
MIN
AVE
TOT
SD
29195.
0.
1108.
93055.
4773.
1305.
0.
22.
20457.
79.
4806.
0.
146.
131151.
319.
4612.
0.
61.
57037.
278.
151.
5.
24.
1933.
26.
1757
0
158
71448
217
S.D.
1065293.
89731.
13908.
10120.
2374.
S.D.
17367600.
722133.
147932.
95223.
20098.
NUMBER
8.
55.
74.
418.
648.
NUMBER
11.
80.
89.
691.
332.
*11*
*12*
81.
0.
52.
156.
25.
2051.
9.
127.
64086.
225.
20.
0.
3.
1296.
3.
10781.
0.
10781.
10781.
0.
3828.
0.
3828.
3828.
0.
2236.
0.
940.
9400.
702.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *g* *7* *g* *9*
MAX
MIN
AVE
TOT
SD
666.
0.
46.
3852.
129.
30.
0.
1.
998.
2.
2006.
0.
24.
21779.
123.
374.
0.
6.
5594.
23.
313.
1.
13.
1082.
39.
263
0
12
5549
27
15.
0.
6.
19.
7.
83.
1.
4.
2248.
9.
11.
0.
1.
346.
1.
*10*
*12*
15.
0.
15.
15.
0.
442.
0.
442.
442.
0.
90.
0.
38.
380.
28.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 4
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
TWT,,T x, - 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1203
VO
O
SD
MAXIMUM
MANUFACTURING EMPLOYMENT 22800.
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O&M COST
TOTAL ANNUAL COST
30745.
24533520.
2292765.
5408521.
' O6M
32953616.
MINIMUM
15.
0.
4104.
375.
896.
ANNUAL COST OF WASTE
REPLACEMENT
18279152.
AVERAGE
788.
332.
303893.
27393.
65993.
TREATMENT
INTEREST
28149872.
TOTAL
947579.
399559.
365583104.
32953616.
79390064.
TOTAL
79382640
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
MAXIMUM
2292765.
410758.
99175.
49539.
9971.
MINIMUM
600453.
100382.
50052.
10027.
375.
AVERAGE
1464739.
187691.
71111.
20728.
5079.
TOTAL
1-0253179.
7507633.
4195576.
7192529.
3808935.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1* *2*
X 15385. 996.
N 0. 0.
E 607. 17.
T 50973. 15939.
2526. 60.
MAXIMUM
30666896.
4777005.
991339.
496718.
99939.
DISTRIBUTION
*3* *4*
3802. 3228.
0. 0.
118. 47.
106441. 43380.
255. 207.
MINIMUM
5027460.
1004449.
503251.
100240.
5129.
OF TOTAL CAPITAL COST
*5* *6*
126. 1757.
5. 0.
21. 147.
1700. 66432.
21. 211.
AVERAGE
14972755.
1734883.
695133.
199872.
67320.
FOR TREATMENT ($
*7* *8*
73. 2051.
0, 7.
47. 114.
141. 57741.
23. 204.
TOTAL
134754800.
114502336.
55610656.
123121136.
29082336.
1000)
*9;* *10*
18. 8653.
0. 0.
2. . 8653.
1021. 8653.
2. 0.
S.D.
1742.
1675.
1246813.
126761.
282056.
S.D.
703919.
87687.
15317.
10333.
2327.
S.D.
9725381.
858197.
144478.
94251.
20180.
NUMBER
7.
40.
59.
347.
750.
NUMBER
9.
66.
80.
616.
432.
*11*
3828.
0.
3828.
3828.
0.
*12*
2236.
0.
940.
9400.
702.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*tl* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
494.
0.
35.
2900.
96.
23.
0.
1.
861.
1.
1445.
0.
18.
16009.
89.
270.
0.
5.
4258.
17.
218.
1.
10.
802.
27.
263
0
11
5039
26
*10*
*11*
*12*
11.
0.
5.
14.
5.
67,
1.
4.
1992.
8.
9.
0.
1.
248.
1.
12.
0.
12.
12.
0.
442.
0.
442.
442.
0.
90.
0.
38.
380.
28.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS.».
WATER USE REGION 5
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
1579
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000,
0. TO 10000.
If* COST RANGE
tO > 5000000.
H» 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
28600,
39212.
67004336.
2774672.
10419546.
OSM
78283072.
MINIMUM
5.
2.
11838.
756.
2259.
ANNUAL COST OF WASTE
REPLACEMENT
40044400.
DISTRIBUTION OF OPERATION
MAXIMUM
2774672.
446479.
99293.
49524.
9944,
MINIMUM
501294.
100710.
50287.
10013.
756.
AVERAGE
814.
578.
507212.
49578.
114000.
TREATMENT
INTEREST
61668336.
AND MAINTENANCE COST
AVERAGE
1200615.
209886.
71046.
21000.
4921.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
83755408.
4697895.
988624.
498353.
99799.
MINIMUM
5185580.
1008279.
501016.
100153.
14797.
AVERAGE
15555507.
2042358.
695504.
206667.
63975.
TOTAL
12814711.
912386.
800888064.
78283072.
180006512.
TOTAL
179995808.
TOTAL
37219072.
19309520.
6109959.
11633853.
«015718.
TOTAL
466665216.
238956000.
92502048.
173807360.
29300736.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6* *7* *8* *9*
*10*
MAX
MIN
AVE
TOT
SD
36891.
0.
1094.
204527.
3791.
1137.
1.
35.
39388.
97.
4235.
0.
189.
224271.
386.
3905.
0.
77.
94774.
275.
84.
5.
21.
2533.
16.
1531
0
122
70022
150
51.
0.
33.
358.
6.
1325.
6.
114.
83416.
168.
44.
0.
4.
1797.
4.
9637.
0.
5361.
26803.
3044.
S.E.
1836.
2475.
2410514.
193222.
(179628.
S.E.
643137.
98111.
13726.
10225.
2583.
S.D.
15531960.
966928.
135310.
97317.
22114.
NUMBER
31.
92.
86.
554.
816.
NUMBER
30.
117.
133.
841.
458.
*11*
0.
0.
0.
0.
0.
*12*
26321.
0.
2413.
53078.
5476.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
+5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
589.
0,
62.
11686.
109.
27.
0.
1.
1552.
2.
1758.
0.
37.
43696.
135.
328.
0.
8.
9714.
25.
74.
1.
9.
1032.
12.
261
0
9
4965
18
5.
0.
2.
20.
1.
73.
1,
4.
3105.
30.
0.
1.
546.
2.
*10*
14.
0.
9.
45.
4.
0.
0.
0.
0.
0.
*12*
881.
0.
87.
1923.
182.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHIY SKEWED.
-------
WATER USE REGION 5
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
m-vm,r „ 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1579
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
28600.
39242.
67001336.
277U672.
10419546.
MINIMUM
5.
2.
9206.
600.
1769.
AVERAGE
814.
542.
486030.
46481.
108213.
TOTAL
1284711.
856523.
767440640.
73392992.
170868512.
S.D.
1836.
2462.
2410467.
192344.
479000.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
73392992.
38372016.
59092896.
TOTAL
170857904.
•**
CD
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
2774672.
446479.
99293.
49985.
9944.
MAXIMUM
83755408.
4697895.
976248.
497428.
99985.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MINIMUM
504294.
100740.
50412.
10051.
600.
AVERAGE
1244113.
211187.
71477.
20975.
4853.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5185580.
1008279.
502255.
100205.
11508.
AVERAGE
15555507.
2002280.
700783.
200837.
64281.
TOTAL
36079296.
18373312.
4717499.
9690472.
4537345.
TOTAL
466665216.
228259920.
73582256.
155045920.
35869072.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT C$ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
36891.
0.
1091.
204021.
3792.
1137.
0.
33.
36426.
96.
4235.
0.
173.
205578.
384.
3905.
0.
71.
87202.
272.
84.
5.
21.
2533.
16.
1531
0
118
67542.
149
*10*
51.
0.
33.
358.
6.
1325.
**6.
113.
82588.
168.
30.
0.
3.
1393.
3.
9637.
0.
5361.
26803.
3044.
S.D.
642313.
99267.
14293.
10274.
2484.
S.D.
15531960.
964551.
138136.
97720.
21787.
NUMBER
29.
87.
66.
462.
935.
NUMBER
30.
114.
105.
772.
558.
*11*
0.
0.
0.
0.
0.
*12*
26321.
0.
2413.
53078.
5476.
*2*
*3*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
589.
0.
62.
11590.
110.
27.
0.
1.
1445.
2.
1758.
0.
34.
40374.
134.
328.
0.
7.
8806.
25.
74.
1.
9.
1032.
12.
261.
0.
8.
4706.
18.
5.
0.
2.
20.
1.
73.
1.
4.
3073.
8.
18.
0.
1.
378.
1.
*10*
14.
0.
9.
45.
4.
*11*
0.
0.
0.
0.
0.
*12*
881.
0.
87.
1923.
182.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 5
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS { 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1579
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
rf* COST RANGE
tO > 5000000.
to 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
28600.
27329.
6472638K.
2014635.
10090902.
06M
58259632.
MINIMUM
5.
1.
7416.
502.
1444.
ANNUAL COST OF WASTE
REPLACEMENT
31064112.
AVERAGE
814.
420.
393466.
36897.
86873.
TREATMENT
INTEREST
47838704.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
2014635.
486345.
99001.
49924.
9961.
MINIMUM
515801.
100740.
50412.
10051.
502.
AVERAGE
1055353.
204245.
72483.
20871.
4494.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
80907968.
4593561.
987378.
497428.
99835.
MINIMUM
5159936.
1008279.
508328.
100066.
9270.
AVERAGE
12798566.
1932893.
704907.
198745.
62871.
TOTAL
1284711.
662631.
621282304-.
58259632.
137173104.
TOTAL
137162448.
TOTAL
24273120.
16135361.
4783849.
8578154.
4494220.
TOTAL
319964160.
206819616.
71900512.
136736576.
41306240.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *«* *5* *6* *7* *8* *9*
*10*
MAX
MIN
AVE
TOT
SD
35206.
0.
705.
131836.
2936.
868.
0.
27.
29596.
75.
3351.
0.
148.
174989.
310.
2734.
0.
55.
66982.
196.
84.
5.
21.
2533.
16.
1531.
0.
113.
64658.
148.
51.
0.
33.
358.
6.
1325.
6.
104.
75713.
149.
28.
0.
2.
1161.
3.
7735.
0.
4302.
21512.
2443.
S.D.
1836.
1795.
1986418.
144442.
376114.
S.E.
469205.
95797.
13865.
10161.
2339.
S.E.
15060702.
897579.
134812.
97230.
21738.
NUMBER
23.
79.
66.
411.
1000.
NUMBER
25.
107.
102.
688.
657.
*11*
0.
0.
0.
0.
0.
*12*
25800.
0.
2365.
52027.
5367.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O£M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
*10*
MAX
MIN
AVE
TOT
SD
472.
0.
48*
8901.
84.
21.
0.
1.
1253.
2.
1267.
0.
26,
30849.
98.
237.
0.
6.
6845.
18.
74.
1.
9.
1032.
12.
261.
0.
8.
4426.
18.
5.
0.
2.
20.
1 .
59.
1.
4.
2716.
6.
14.
0.
1.
293.
1.
12.
0.
8.
38.
4.
+ 11*
0.
0.
0.
0.
0.
*12*
864.
0.
86.
1886.
179.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
WATER USE REGION 6
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
357
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
11*000.
46821.
22045040.
1422552.
4222271.
MINIMUM
19.
7.
12524.
860.
2957.
AVERAGE
603.
586.
341399.
25248.
68603.
TOTAL
215130.
209377.
121879600.
9013627.
24491360.
S.D.
1146.
3217.
1325357.
104537.
266297.
06M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
9013627.
6093979.
9384724.
TOTAL
24492320.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
t£« COST RANGE
CO > 5000000.
** 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
1422552. 521322. 1027652.
330771. 118726. 195392.
95850. 51805. 68597.
46235. 10050. 21021.
9967. 860. 4619.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE
27556288. 5669775. 11741644.
4956188. 1066293. 2050837.
962863. 534112. 727568.
496098. 100393. 201460.
99588. 15655. 62890.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* '
TOTAL
3082956.
1758529.
1234743.
1828851.
1108611.
TOTAL
46966576.
47169264.
13096222.
37068576.
8049934.
MAX
MIN
AVE
TOT
SD
10526.
0.
499.
10974.
2240.
899.
1.
22.
5253.
73.
2841.
0.
118.
29501.
256.
3933.
0.
71.
18413.
311.
266.
6.
23.
971.
40.
2214
0
178
26403
310
*10*
41.
0.
35.
175.
5.
3981.
6.
129.
28045.
351.
11.
1.
2.
196.
1.
1947.
0.
1947.
1947.
0.
S.D.
460832.
69446.
12871.
10971.
2509.
S.D.
10573292.
1331146.
114806.
98960.
21774.
NUKEER
3.
9.
18.
87.
240.
NUMBER
4.
23.
18.
184.
128.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OgM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
186.
0.
13.
275.
39.
11.
0.
1.
175.
1.
982.
0. ;
14.
3586.
68.
150
t 0
4
1141
15
503.
1.
19.
790.
77.
352.
0.
14.
2110.
40.
3,
0.
2.
10.
184.
0.
4.
885.
15.
3.
0.
0.
37.
0.
*10*
4.
0.
4.
4.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHHY SKEWED.
-------
WATER USE REGION 6
PLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 357
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OgM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
SOOOO. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
1C* COST RANGE
CO > 5000000.
cn 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 10 0 00 0.
MAX
MIN
AVE
TOT
SD
*1*
10526.
0.
499.
10974.
2240.
*2*
899.
1.
21.
5126.
72.
MAXIMUM
14000.
46821.
22045040.
1422552.
4222271,
OSM*
8760657.
MINIMUM
19.
7.
12524.
860.
2957.
ANNUAL COST OF WASTE
REPLACEMENT
5957297,
DISTRIBUTION OF OPERATION
MAXIMUM
1422552.
485575.
95850.
45175.
9967.
MINIMUM
1139082.
118726.
50934.
10041.
860.
AVERAGE
603.
567.
333742.
24540.
66922.
TREATMENT
INTEREST
9174233.
AND MAINTENANCE COST
AVERAGE
1280817.
231374.
67607.
20781.
4538.
TOTAL
215130.
202243.
119145952.
8760657.
23891200.
TOTAL
23892176
TOTAL
2561634.
2082366.
1284542.
1724831.
1107351.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
27556288.
4956188.
962863.
496098.
98927.
DISTRIBUTION
*3+ *4*
2841. 3933.
0. 0.
116. 69.
28968. 17802.
256. 306.
MINIMUM
5669775.
1066293.
534112.
100393.
15655.
AVERAGE
11633244.
1984993.
721629.
197114.
62697.
TOTAL
46532976.
45654848.
12989328.
35480544.
8275968.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
266. 2114.
6. 0.
23. 173.
960. 25622.
40. 299.
*7* *8*
39. 3981.
0. 6.
34. 126.
169. 27390.
5. 345.
*9* *10*
11. 1947.
0. 0.
2. 1947.
188. 1947.
1. 0.
S.D.
1146.
3165.
1316575.
103684.
264310.
S.D.
200443.
110484.
13424.
10594.
2433.
S.D.
10632504.
1287540.
117093.
94550.
21398.
NUMBER
2.
9.
19.
83.
244.
NUMBER
4.
23.
18.
180.
132.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS C$ 1000)
*U* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
186.
0.
13.
275.
39.
11.
0.
1.
172.
1.
982.
0.
14.
3526.
68.
150.
0.
4.
1102.
15.
503.
1.
18.
776.
77.
329.
0.
14.
2002.
38.
3.
0.
2.
9.
1.
184.
0.
4.
860.
14.
3.
0.
0.
35.
0.
*10*
4.
0.
4.
4.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGH1Y SKEWED.
-------
WATER USE REGION 6
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
_,,_,,. 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 357
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
11000.
30781.
13601761.
988628.
2716051.
MINIMUM
19.
6.
9873.
860.
2287.
AVERAGE
603.
108.
266821.
18819.
52735.
TOTAL
215130.
115659.
95256192.
6729197.
18826221.
S.D.
1116.
2138.
866071.
72818.
178786.
O6M
6729197.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1762809.
7331723.
TOTAL
18826720.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
£* COST RANGE
SD > 5000000.
O> 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION
MAXIMUM MINIMUM
988628. 780627.
380689. 109526.
88786. 50331.
17518. 10103.
9975. 860.
AND MAINTENANCE COST
AVERAGE
881628.
185639.
65366.
22107.
1372.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE
17002192. 5827697. 111119U1.
1171366. 1008169. 2020916,
916023. 532680. 722855.
U85888. 100218. 193077.
98112. 12311. 62670.
TOTAL
1769255.
1185115.
653659.
1680117.
1111111.
TOTAL
22829888.
12139218.
12288532.
32050832.
9163161.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *1* *5* *6* *7* *8* *9*
*10*
MAX
MIN
AVE
TOT
SD
5218.
0.
251.
5593.
1109.
657.
1.
17.
1081.
51.
2169.
0.
97.
21269.
200.
2601.
0.
50.
12835.
208.
220.
S,
20.
816.
33.
1801.
0.
151.
22100.
218.
36.
0.
30.
152.
1.
3010.
5.
107.
23303,
270.
8.
0.
2.
161.
1.
1610.
0.
1610.
1610.
0.
S.D.
117082.
89573.
12130.
11125.
2391.
S.D.
7901518.
1237718.
111865.
93901.
22069.
NUMBER
2.
8.
10.
76.
261.
NUKBER
2.
21.
17.
166.
151.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS {$ 1000)
*5* *6* *7* *8* *9*
132.
0.
9.
207.
28.
8.
0.
1.
153.
1.
672.
0.
11.
2629.
17.
103.
0.
3.
827.
10.
356.
1.
11.
567.
51.
260
0
11
1608
29
2.
0.
1.
7.
0.
123.
0.
3.
698.
10.
2.
0.
0.
29.
0.
*10*
3.
0.
3.
3.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS..,
WATER USE REGION 7
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
1749
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O£K COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
1C* COST RANGE
CO > 5000000.
-------
WATER USE REGION 7
FLOW LESS THAN OR EQOAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1709
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
36000.
81468.
66683920.
3125120.
10224305.
MINIMUM
7.
3.
14615.
718.
2574.
AVERAGE
508.
625.
441015.
26780.
82793.
TOTAL
889309.
1092925.
771331*656.
U6837920.
1414801*288.
S.D.
1230.
3454.
2312771.
126259.
410985.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
46837920.
38566720.
59392736.
TOTAL
144797376.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
It*
C£>
oo
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
3125120.
479447.
98445.
49678.
9970.
MAXIMUM
83354896.
4884566.
986104.
498866.
99651.
MINIMUM
506185.
100338.
50691.
10072.
718.
AVERAGE
1090930.
222613.
71099.
19798.
4957.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5195718.
1004533.
500314.
100556.
18269.
AVERAGE '
17213056.
1961390.
689426.
219449.
71177.
TOTAL
16363956.
12243705.
3412775.
8988262.
5833865.
TOTAL
413113600.
196139040.
82731136.
244466304.
27830064.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*4* *5* *6* *7* *8* *9*
20.
0.
3.
926.
2.
MAX
MIN
AVE
TOT
SD
37601.
Q-
702.
44255.
4727.
4064.
1.
22.
22498.
145.
2230.
0.
97.
84431.
146.
21509.
0.
106.
131431.
810.
107.
5.
21.
4743.
15.
8209.
0.
204.
207447.
437.
63.
0.
38.
1016.
9.
6039
5
144
189438
380
*10*
0.
0.
0.
0.
0.
S.D.
728411.
106522.
15250.
9401.
.2315.
S.D.
17941024.
1092549.
138534.
97780.
20880.
NUMBER
15.
55.
48.
454.
1177.
NUMBER
24.
100.
120.
1114.
391.
*11*
9453.
0.
5435.
54350.
2381.
*12*
25427.
0.
3858.
30867.
8722.
*1*
MAX
MIN
AVE
TOT
SD
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
443.
0.
22.
388 i
58.
50.
0.
1.
689.
2.
441.
0.
9.
7935.
26.
695.
0.
5.
5999.
26.
148.
1.
8.
1901.
16.
2045
0
17
17497
80
3.
0.
2.
60.
2.
335.
0.
4.
5533.
15.
5.
0.
0.
154.
1.
*10*
0.
0.
0.
0.
0.
*11*
947.
0.
470.
4699.
228.
*12*
807.
0.
123.
985.
277.
SD
OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 7
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1749
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
36000.
65893.
11356960.
2604477.
6857330.
MINIMUM
7.
2.
9253.
606.
1989.
AVERAGE
508.
461.
353037,
20764.
65603.
TOTAL
889309.
806440.
617461760.
36316496.
114739344.
S.E.
1230.
2647.
1693596.
101534.
312446.
OEM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
36316496.
30873072.
47544528.
TOTAL
114734096.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
*f» COST RANGE
tO > 5000000.
CO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE
2604477. 503414. 1043446.
450110. 101472. 220904.
96793. 52031. 71707.
49752. 10012. 18827.
9997. 606. 4553.
MAXIMUM
51696192.
4775635.
993066.
497712.
99930.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
5454358.
1007220.
503460.
100372.
11566.
AVERAGE
15737613.
2110840.
692936.
213673.
67776.
TOTAL
11477911.
9498860.
2581460.
6871961.
5891071.
TOTAL
299014656.
141426304.
78994704.
216023664.
36463488.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
19456.
0.
372.
23465.
2445.
3469.
1.
18.
17531.
123.
1767.
0.
75.
65683.
111.
17450.
0.
80.
98664.
639.
81.
4.
17.
3775.
11.
7299.
0.
178.
180516.
379.
57.
0.
34.
917.
8.
5269.
4.
120.
157831.
318.
12
0
2
729
2
*10*
0.
0.
0.
0.
0.
s.c.
624046.
100413.
13716.
9108.
2317.
S.E.
12860205.
1096603.
144567.
96464.
21271.
NUKEER
11.
43.
36.
365.
1294.
NUKEER
19.
67.
114.
1011.
538.
*11*
7862.
0.
4520.
45203.
1980.
*12*
19112.
0.
2900.
23201.
6556.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*t|* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
329.
0.
16.
992.
43.
42.
0.
1 .
595.
2.
318.
0.
6.
5448.
18.
574.
0.
4.
4553.
21.
103.
0.
5.
1228.
11.
1717
0
14
14184
66
6.
0.
2.
47.
1.
271.
0.
3.
4491.
12.
3.
0.
0.
111.
0.
*10*
0.
0.
0.
0.
0.
*11*
791.
0.
393.
3926.
191.
*12*
611.
0.
93.
746.
210.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
WATER USE REGION 8
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
1436
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
20500.
96435.
150539616.
6808742.
25927248.
MINIMUM
6.
0.
3339.
304.
728.
AVERAGE
704.
726.
723201.
53367.
145223.
TOTAL
1010992.
1042858.
1038517248.
76635376.
208540880.
B.C.
1607.
4796.
582C064.
314476.
1046323.
OSK
76635376.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
51925856.
79965776.
TOTAL
208527008.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
*1*
*2*
MAXIMUM
6808742.
476720.
99775.
49573.
9996.
MAXIMUM
188174512.
4788263.
989858.
497594.
99947.
MINIMUM
676660.
100704.
50403.
10027.
304.
AVERAGE
2280439.
189357.
71522.
21515.
5603,
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5085295. 35438080.
1012275. 1976208.
502638. 722366.
100093. 219998.
4174. 70864.
TOTAL
36487024.
16284703.
7223716.
13167052.
3479736.
TOTAL
744199680.
245049808.
97519424.
191178048.
20338064.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
v
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
127753.
0.
3956.
395575.
17264.
2354.
0.
33.
34883.
136.
8050.
0.
191.
180551.
504.
10028.
0.
101.
109938.
570.
432.
7.
29.
3558.
44.
2445
0
205
120173
266
40.
0.
35.
104.
4.
7343.
9.
187.
122259.
404.
35.
0.
4.
2027.
4.
*10*
0.
0.
0.
0.
0.
S.E.
1970453.
81825.
14281.
10609.
2516.
S.C.
50026736.
.855197.
148041.
100054.
21723.
NUKEER
16.
86.
101.
612.
621.
NUMBER
21.
124.
135.
869.
287.
*11*
5293.
0.
3249.
9746.
1771.
*12*
16737.
0.
3322.
59791.
4501.
*2*
*3*
DISTRIBUTION OF ANNUAL O&M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
1363.
0.
82.
8206.
221.
59.
0.
1.
1415.
3.
4390.
0.
37.
35322.
233.
813.
0.
9.
9543.
42.
1309.
1.
24.
2935.
120.
524
0
18
10683
38
2.
0.
2.
6.
0.
538.
1.
7.
4713.
25.
17.
0.
1.
577.
2.
*10*
0.
0.
0.
0.
0.
*11*
520,
0.
322.
966.
171.
*12*
607.
0.
126.
2271.
163.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATl'R USE REGION 8
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 14J6
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
100CO. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
37230.
0.
1587.
158718.
6043.
*2*
1642.
0.
24.
26124.
94.
MAXIMUM
20500.
81138.
55021232.
3813776.
10486918.
OSM
56399744.
MINIMUM
6.
0.
3339.
304.
728.
ANNUAL COST OF WASTE
REPLACEMENT
35136336.
AVERAGE
704.
535.
489364.
39276.
101434.
TREATMENT
INTEREST
54109936.
TOTAL
1010992.
768386.
702726912.
56399744.
145659488.
TOTAL
145646016
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
3813776.
371124.
99528.
49662.
9994.
MINIMUM
507291.
100538.
50403.
10029.
304.
AVERAGE
1593913.
173443.
71468.
20431.
5282.
TOTAL
23908704.
12140983.
6146264.
10154263.
4056305.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
68776528.
4332921.
994699.
498980.
99673.
DISTRIBUTION
*3* *4*
5265. 8192.
0. 0.
147. 73.
139005. 79650.
356. 385.
MINIMUM
5055837.
1003880.
508719.
100093.
4174.
OF TOTAL CAPITAL COST
*5* *6*
412. 2445.
7. 0.
29. 191.
3457. 112273.
41. 269.
AVERAGE
20549200.
1976266.
728890.
203323.
69784.
FOR TREATMENT ($
*7* *8*
40. 6869.
0. 9.
35. 176.
104. 115131.
4. 374.
TOTAL
390434816.
215413072.
84551296.
159811600.
28332272.
1000)
*9* *10*
35. 0.
0. 0.
3. 0.
1629. 0.
3. 0.
S.D.
1607.
3222.
2650615.
199165.
530820.
S.D.
1129639.
68201.
14379.
10345.
2373.
S.D.
20624032.
871593.
153574.
95655.
21169.
*11*
5293.
0.
3249.
9746.
1771.
NUMBER
15.
70.
86.
497.
768.
NUMBER
19.
109.
116.
786.
406.
*12*
15949.
0.
3165.
56977.
4289.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*U* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
797.
0.
55.
5511.
135.
36.
0.
1.
1 154.
2.
2428.
0.
24.
22591.
134.
452.
0.
6.
6737.
26.
1202.
1.
23.
2731.
110.
524.
0.
17.
9874.
38.
2.
0.
2.
6.
0.
484.
1.
6.
4242.
22.
13.
0.
1.
421.
1,
*10*
0.
0.
0.
0.
0.
*11*
520.
0.
322.
966.
171.
*12*
580.
0.
120.
2167.
156.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 8
FLOW OF LEAST EFFICIENT TWO-THIRDS CF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 11436
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
yi COST RANGE
O > 5000000.
tO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
19443.
0.
747.
74699.
2769.
*2*
1105.
0.
18.
19664.
67.
MAXIMUM
20500.
35015.
29633344.
2767396.
6530829.
06M
42646512.
MINIMUM
6.
0.
2673.
283.
622.
ANNUAL COST OF WASTE
REPLACEMENT
26172096.
AVERAGE
704.
392.
364514.
29698.
76000.
TREATMENT
INTEREST
40305024.
TOTAL
1010992.
563121.
523442176.
42646512.
109136064.
TOTAL
109123632
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
2767396.
371124.
99984.
49685.
9993.
MINIMUM
511689.
100759.
50403.
10045.
283.
AVERAGE
1209821.
185020.
72075.
20182.
4941.
TOTAL
15727677.
9065991.
5405655.
7992024.
4461942.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
37041680.
4423065.
989858.
496442.
99698.
DISTRIBUTION
*3* *4*
4161. 3834.
0. 0.
116. 54.
109208. 59227.
268. 252.
MINIMUM
5687112.
1012275.
506635.
100058.
3342.
OF TOTAL CAPITAL COST
*5* *6*
276. 2445.
6. 0.
22. 179.
2622. 104971.
27. 267.
AVERAGE
16713271.
1990174.
723439.
197548.
67157.
FOR TREATMENT C$
+7* *8*
39. 3870.
0. 6.
34. 152.
' 101. 99186,
4. 287.
TOTAL
217272528.
199017424.
64386064.
137691104.
36063216.
1000)
*9* *10*
23. 0.
0. 0.
2. 0.
1275. 0.
3. 0.
S.B.
1607.
1971.
1510967.
136746.
325158.
s.c.
736411.
73520.
14073.
10163.
2364.
S.E.
10099351.
903890.
158972.
95622.
21262.
NUMBER
13.
49.
75.
396.
903.
NUMBER
13.
100.
89.
697.
537.
*11*
5293.
0.
3249.
9746.
1771.
*12*
11988.
0.
2379.
42827.
3224.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*il* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
592.
0.
39.
3866.
98.
27.
0,
1.
978.
2.
1749.
0.
17.
15642.
93.
327.
0.
5.
5083.
18.
577.
1.
12.
1457.
53.
524
0
16
9234
37
2.
0.
2.
5.
0.
202.
1.
5.
3U80.
12.
7.
0.
1.
298.
1.
*10*
0.
0.
0.
0.
0.
*11*
520.
0.
322.
966.
171.
*12*
1439.
0.
91.
1642.
118.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
WATER USE REGION 9
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
985
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANHUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
CJ1 COST RANGE-
O > 5000000.
W 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SO
*1*
1602.
0.
190.
7039.
363.
*2*
347.
0.
25.
14750.
45.
MAXIMUM
38000.
11447.
9284427.
712235.
1827466.
OSM
24839632.
MINIMUM
5.
2.
11068.
666.
2071.
ANNUAL COST OF WASTE
REPLACEMENT
14920229.
DISTRIBUTION OF OPERATION
MAXIMUM
712235.
386960.
98297.
49615.
9963.
MINIMUM
621094.
102423.
50201.
10020.
666.
AVERAGE
567.
365.
302949.
25218.
63695.
TREATMENT
INTEREST
22977136.
AND MAINTENANCE COST
AVERAGE
657084.
186512.
67761.
20812.
4679.
TOTAL
558473.
359125.
298404608.
24839632.
62739248.
TOTAL
62736992
TOTAL
2628337.
8206511.
4133451.
7450594.
2423628.
'DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
11605533.
4750880.
949583.
498629.
99930.
DISTRIBUTION
*3* *4*
1515. 2209.
0. 0.
115. 56.
71525. 31930.
160. 148.
MINIMUM
5044770.
1009335.
502534.
100265.
13835.
AVERAGE
6806281.
1970288.
709745.
220703.
61817.
TOTAL
34031408.
151712240.
49682160.
119621008.
17988656.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
137. 1465.
3. 0.
31. 211.
3104. 75083.
26. 260.
*7* *R*
41. 1958.
0. 7.
36. 139.
218. 81287.
4. 228.
*9* *10*
43. 0.
0. 0.
5. 0.
1535. 0.
7, 0.
S.D.
1619.
1018.
605359.
59000.
132675.
S.t.
38836.
82505.
13918.
9980.
2578.
S.E.
2724679.
994208.
141219.
97546.
20232.
NUKBER
H.
44.
61.
358.
518.
NUMBER
5.
77.
70.
542.
291.
*11*
3653.
0.
3653.
3653.
0.
*12*
3691.
0.
1037.
8296.
1110.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*H* *5* *6* *7* *3* *9*
MAX
MIN
AVE
TOT
SD
166.
0.
24.
882.
37.
9.
0.
1.
622.
1.
435.
0.
14.
8488.
36.
82.
0.
5.
2868.
10.
146.
0.
19.
1885.
29.
216
0
18
6254
32
3.
0.
2.
12.
0.
56.
1.
5.
2685.
7.
17.
0,
1.
446.
3.
*10*
0.
0.
0.
0.
0.
*11*
373.
0.
373.
373.
0.
*12*
144.
0.
41.
328.
43.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 9
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 985
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000,
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
1602.
0.
190.
7026.
363.
*2*
312.
0.
21.
12535.
42.
MAXIMUK
38000.
11447.
9281427.
712235.
1827466.
O£M
22124688.
MINIMUM
5.
2.
10037.
608.
1883.
ANNUAL COST OF WASTE
REPLACEMENT
13633637.
DISTRIBUTION OF OPERATION
MAXIMUM
712235.
386960.
98297.
49615.
9954.
MINIMUM
621094.
100160.
50727.
10018.
608.
AVERAGE
567.
325.
276825.
22462.
57618.
TREATMENT
INTEREST
20995792.
AND MAINTENANCE COST
AVERAGE
657084.
180857.
68727.
20418.
4521.
TOTAL
558473.
319684.
272672768.
22124688.
56753568.
TOTAL
56754112
TOTAL
2628337.
7234288.
3298893.
6329646.
2635878.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
11605533.
4750880.
968058.
499856.
99908.
DISTRIBUTION
*3* *4*
1515. 2209.
0. 0.
102. 49.
63425. 28391.
151. 142.
MINIMUM
5044770.
1005819.
502534.
100437.
12546.
AVERAGE
6806281.
1969424.
703686.
211789.
63327.
TOTAL
34031408.
135890320.
44332208.
103988448.
22607808.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
137. 1465.
3. 0.
28. 198.
2836. 70436.
25. 255.
*7* *8*
41. 1958.
0. 7.
36. 128.
218. 74639.
4. 218.
*9* *10*
35. 0.
0. 0.
4. 0.
1217. 0.
6. 0.
S.E.
161'J.
98''.
592770.
57059.
129399.
S.D.
38836.
80288.
12951.
9916.
2407.
S.D.
2724679.
1006354.
148391.
93420.
21547.
NUMBER
4.
40.
48.
310.
583.
NUMBER
5.
69.
63.
491.
357.
*11*
3653.
0.
3653.
3653.
0.
*12*
3691.
0.
1037.
8296.
1110.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
166.
0.
24.
877.
37.
9.
0.
1.
558.
1.
U35.
0.
12.
7246.
33.
82.
0.
4.
2494.
9.
146.
0.
16.
1637.
27.
216.
0.
16.
5810.
31.
3.
0.
2.
12.
0.
56.
1.
4.
2469.
7.
13
0
1
324
2
*10*
0.
0.
0.
0.
0.
*11*
373.
0.
373.
373.
0.
*12*
144.
0.
41.
328.
43.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATFR USE REGION 9
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
19b8 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 985
MANUFACTURING EMPLOYMENT
FLOW (KGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
CA COST RANGE
O > 5000000.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
WATER USE REGION 10
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
336
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O8M COST
TOTAL ANNUAL COST
cn
o
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
COST RANGE
> 5000000.
O> 1000000. TO
MAX
MIN
AVE
TOT
SD
500000. TO
100000. TO
0. TO
*1*
18152.
0.
1254.
35110.
4171.
500000.
100000.
50000.
10000.
5000000.
1000000.
500000.
100000.
*2*
1146.
1.
78.
15346.
174.
MAXIMUM
5200.
52416.
39291824.
1872942.
64314476.
OSM
20759728.
MINIMUM
6.
4.
22770.
959.
4292.
ANNUAL COST OF WASTE
REPLACEMENT
14908248.
DISTRIBUTION OF OPERATION
MAXIMUM
1872942.
440389.
99383.
46769.
9950.
MINIMUM
509459.
103202.
53058.
10181.
959.
AVERAGE
370.
115fa.
887396.
61785.
174486.
TREATMENT
INTEREST
22958688.
AND KAINTENANCE COST
AVERAGE
914434.
194825.
71415.
19277.
4964.
TOTAL
124459.
388406.
298164992.
20759728.
58627312.
TOTAL
58626656
TOTAL
7315474.
8961967.
1713958.
2004809.
764416.
DISTRIBUTION CF INVESTMENT REQUIREMENTS
MAXIMUM
49114768.
4264273.
933626.
489455.
99510.
DISTRIBUTION
*3* *4*
2764. 4629.
0. 0.
217. 204.
32750. 51420.
340. 593.
MINIMUM
5363490.
1005091.
500552.
100121.
28463.
AVERAGE
13258165.
2020885.
654686.
229253.
70510.
TOTAL
198872480.
109127808.
22259328.
37597456.
4865197.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
295. 3202.
6. 0.
38. 358,
1883. 65447.
49. 543.
*7* *8*
66. 4508.
0. 6.
53. 235.
372. 55610.
8. 471.
*9* *10*
20. 6946.
1. 0.
3. 6946.
206. 6946.
4. 0.
s.t.
579.
3828.
2962979.
167850.
535563.
S.E.
494614.
93785.
13028.
8514.
2346.
S.C.
12215832.
830306.
137866.
102731.
24243.
NUMBER
8.
46.
24.
104.
154.
NUKEER
15.
54.
34.
164.
69.
5544.
0,
5544.
5544.
0.
*12*
18444.
0.
3442.
27538.
6094.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6K TREATMENT COSTS ($ 1000)
*!4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
364.
0.
34.
962.
80.
16.
0.
2.
323.
2.
515.
0.
32,
4779.
68.
196.
0.
11.
2785.
25.
658.
1.
38.
1907.
99.
582
0
36
6668
81
*10*
*11*
*12*
8.
0.
5.
35.
1.
246.
0.
7.
1747.
20.
5.
0.
1.
42.
1.
11.
0.
11.
11.
0.
475.
0.
475.
475.
0.
678.
0.
128.
1026.
223.
SO OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 10
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 336
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O&M COST
TOTAL ANNUAL COST
MAXIMUM
5200.
22538.
29376864.
1185233.
4916093.
MINIMUM
6.
i*.
19180.
950.
361*0.
AVERAGE
370.
696.
656501.
42605.
125975.
TOTAL
124459.
233830.
220584416.
14315160.
42327648.
S.D.
579.
2151.
2082921.
117110.
376415.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
14315160.
11029220.
16984976.
TOTAL
42329344.
cn
o
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000,
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
DISTRIBUTION OF OPERATION
MAXIMUM MINIMUM
1185233. 584607.
459345. 102396.
95505. 50024.
49440. 10029.
9993. 950.
AND MAINTENANCE COST
AVERAGE
817553.
201264.
69824.
18300.
4653.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE
36721072. 5109412. 11102617.
3977456. 1022953. 1975686.
957217. 517203. 709703.
480902. 101396. 223014.
99574. 23975. 6639".
TOTAL
4087767.
5434117.
2304194.
1647016.
842157.
TOTAL
133231408.
81003136.
17742576.
37912400.
5842662.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* +14* *5* *6* *7* *8* *9*
*10*
S.D.
238013.
113240.
14284.
8467.
2314.
S.D.
8564458.
829330.
162189.
96096.
22799.
NUMBER
5.
27.
33.
90.
181.
NUMBER
12.
41.
25.
170.
88.
*11*
*12*
MAX
MIN
AVE
TOT
SD
11879.
0.
604.
"16909.
2297.
1045.
1.
61.
12051.
145.
1609.
0.
141.
21262.
217.
3-588.
0.
142.
35866.
435.
202.
4.
26.
1301.
32.
2990.
0.
306.
55992.
483.
47.
0.
38.
264.
5.
2620.
6.
181.
42900.
339.
10.
0.
2.
143.
2.
6946.
0.
6946.
6946.
0.
4188.
0.
4188.
4188.
0.
15244.
0.
2845.
227faO.
5036.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O£M TREATMENT COSTS ($ 1000)
*il* *5* *b* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
298.
0.
23.
649.
59.
15.
0.
1.
269.
2.
282.
C.
17.
2574.
39.
156.
0.
8.
1949.
19.
328.
1.
18.
879.
48.
525
0
30
5466
71
0.
2.
15.
1.
110.
0,
5.
1265.
11.
2.
0.
0.
25.
0.
*10*
*11*
*12*
1 1.
0.
11.
11.
0.
362.
0.
362.
362.
0.
563.
0.
107.
852.
186.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 10
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL tniMBER OF MANUFACTURING PLANTS... 336
un
o
03
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
6429.
0.
295.
8253.
1214.
*2*
873.
1.
48.
9489.
118.
MAXIMUM
5200.
12148.
19617280.
881817.
3373211.
OSM
10597923.
MINIMUM
6.
3.
12562.
671.
2358.
ANNUAL COST OF WASTE
REPLACEMENT
8542415.
DISTRIBUTION OF OPERATION
MAXIMUM
881817.
477963.
99285.
49969.
9782.
MINIMUM
529572.
113495.
51885.
10095.
671.
AVERAGE
370.
482.
508477.
31541.
96115.
TREATMENT
INTEREST
13155314.
AND MAINTENANCE COST
AVERAGE
678565.
249398.
71902.
21540.
4392.
TOTAL
124459.
161931.
170848320.
10597923.
32294704.
TOTAL
32295648
TOTAL
2035694.
3990375.
1797538.
1874011.
900398.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
24521600.
4734063.
987287.
494184.
99617.
DISTRIBUTION
*3* *4*
1164. 2832.
0. 0.
100. 105.
15093. 26425.
146. 331.
MINIMUM
5150211.
1034456.
500719.
100932.
15703.
AVERAGE
9076302.
1884561.
682143.
225456.
63036.
TOTAL
90763024.
67844208.
11596429.
36298400.
7060006.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
135. 2618.
3. 0.
20. 267.
1017. 48930.
21. 421.
*7* *8*
42. 1866.
0. 6.
34. 148.
238. 35030.
5. 264.
*g* *1Q*
6. 5668.
0. 0.
2. 5668.
112. 5668.
2. 0.
S.E.
579.
1423.
1490072.
86476.
273128.
s.c.
182284.
116779.
15043.
11722.
2416.
S.E.
5774378.
886358.
157801.
10U170.
22464.
NUMBER
3.
16.
25.
87.
205.
NUMBER
10.
- 36.
17.
161.
112.
*11*
3483.
0.
3483.
3483.
0.
*12*
11458.
0.
2138.
17108.
3786.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
221.
0.
15.
427.
42.
12.
0.
1.
226.
2.
204.
0.
10.
1532.
24.
125.
0.
6.
1450.
15.
158.
0.
10.
513.
23.
431
0
24
4470
58
2.
0.
2.
12.
0.
55.
0.
4.
993.
8.
1.
0.
0.
18.
0.
*10*
9.
0.
9.
9.
0.
*11*
302.
0.
302.
302.
0.
*12*
427.
'0.
81.
646.
141.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHIY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
WATER USE REGION 11
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
402
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
6200.
11233.
6487405.
934050.
1757950.
MINIMUM
6.
0.
1766.
248.
472.
AVERAGE
373.
364.
422495.
30090.
83744.
TOTAL
149789.
146458.
169842848.
12096085,
33665136.
S.E.
697.
934.
864911.
70679.
177021.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
12096085.
8492141.
13077892.
TOTAL
33666112.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000; TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000,
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
934050.
437354.
99476.
48284.
9949.
MAXIMUM
8109256.
4650511.
930334.
494909.
98967.
MINIMUM
934050.
101267.
50012.
10011.
248.
AVERAGE
934050.
206661.
69652.
21549.
4757.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5074037. 6398678.
1022620. 2384990.
506701. 691806.
100266. 206801.
2207. 61403.
TOTAL
934050.
5579847.
1810964.
2715195.
1056139.
TOTAL
31993392.
114479520.
15219741.
43428160.
7184204.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
2663.
0.
316.
9177.
520.
423.
0.
39.
9280.
76.
1794.
0.
98.
18982.
162.
1078.
0.
77.
16155.
192.
136.
6.
25.
2232.
19.
1484.
0.
250.
37783.
330.
38.
0.
32.
223.
5.
1470.
6.
135.
37099.
183.
32
0
5
554
6
*10*
0.
0.
0.
0.
0.
S.E.
0.
70784.
16387.
10455.
2451.
S.E.
1545908.
1229930.
134916.
99037.
24164.
*11*
0.
0.
0.
0.
0.
NUMBER
1.
27.
26.
126.
222.
NUK.EER
5.
48.
22.
210.
117.
*12*
4620.
0.
1827.
38357.
1079.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
213.
0.
34.
992.
41.
11.
0.
1.
282.
1.
576.
0.
11.
2190.
43.
108.
0.
5.
1123.
12.
175.
1.
14.
1211.
26.
193
0
23
3403
39
3.
0.
2.
12.
1.
51.
0.
4.
1190.
6.
11.
0.
1.
136.
2,
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
*12*
180.
0.
74.
1559.
43.
3D OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 11
FLOW LESS THAN OR ^QUAL TO MEDIAN OF WATER USE REGIONS
"968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 402
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O£M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000,
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
1925.
0.
227.
6587.
381.
*2*
361.
0.
31.
7360.
61.
MAXIMUM
6200.
9075.
5186667.
774778.
1433484.
O6M
9747471.
MINIMUM
6.
0.
1766.
248.
472.
ANNUAL COST OF WASTE
REPLACEMENT
6880015.
DISTRIBUTION OF OPERATION
MAXIMUM
774778.
437354.
78220.
47202.
9738.
MINIMUM
774778.
101267.
52147.
10510.
248.
AVERAGE
373.
282.
342289.
24247.
67716.
TREATMENT
INTEREST
10595219.
AND MAINTENANCE COST
AVERAGE
774778.
168679.
62759.
21693.
4389.
TOTAL
149789.
113204.
137600320.
9747471.
27221984.
TOTAL
27222704,
TOTAL
774778.
4385658.
1004136.
2516433.
1066550.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
6483333.
3956963.
974062.
487639.
97291.
DISTRIBUTION
*3* *4*
1566. 874.
0. 0.
89. 60.
17289. 12473.
144. 1«6.
MINIMUM
5577258.
1022620.
503475.
100303.
2207.
AVERAGE
6045786.
2236360.
743595.
202996.
60823.
TOTAL
18137360.
89454416.
17102688.
38366272.
8941020.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
136. 1237.
6. 0.
22. 209.
1945. 31628.
18. 275.
*7* *8*
38. 1470.
0. 6.
32. 109.
223. 29948.
5. 157.
*9* *10*
24. 0.
0. 0.
4. 0.
430. 0.
4. 0.
S.D.
697.
793.
687121.
58090.
142186.
S.D.
0.
67091.
8812.
10240.
2434.
S.D.
453908.
957353.
170725.
97393.
23466.
NUMBER
1.
26.
16.
116.
243.
NUtfEER
3.
40.
23.
189.
147.
*11*
0.
0.
0.
0.
0.
*12*
3580.
0.
1415.
29718.
836.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
179.
0.
27.
791.
3tt.
10.
0.
1.
245.
1.
475.
0.
10.
1908.
36.
89.
0.
4.
910.
9.
175.
1.
11.
1004.
25.
147
0
17
2604
30
3.
0.
2.
12.
1.
51.
0.
3.
961.
5.
7.
0.
1.
96.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
141.
0.
58.
1216.
34.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 1 1
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 402
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
CJ1 COST RANGE
M > 5000000.
*-» 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
1133.
0.
155.
4498.
251.
*2*
279.
0.
25.
5822.
48.
MAXIMUM '
6200.
8770.
4461807.
564708.
1025649.
OSM
7791428.
MINIMUM
6.
0.
1766.
248.
472.
ANNUAL COST OF WASTE
REPLACEMENT
5559682.
DISTRIBUTION OF OPERATION
MAXIMUM
564708.
437354.
96163.
48084.
9797.
MINIMUM
564708.
104808.
54321.
10046.
248.
AVERAGE
373.
220.
276601.
19382.
54508.
TREATMENT
INTEREST
8561906.
AND MAINTENANCE COST
AVERAGE
564708.
148090.
71385.
21586.
4096.
TOTAL
149789.
88604.
111193648.
7791428.
21912304,
TOTAL
21913008
TOTAL
564708.
2813712.
999394.
2352889.
1060800.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
5577258.
4536817.
966439.
487639.
98583.
DISTRIBUTION
*3* *4*
1244. 818.
0. 0.
79. 44.
15324. 9285.
122. 108.
MINIMUM
5577258.
1022620.
504808.
100369.
2207.
AVERAGE
5577258.
2024141.
699849.
194765.
58477.
TOTAL
5577258.
72869088.
17496224.
33109968.
9941023.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
136. 1005.
6. 0.
20. 176.
1762. 26534.
18. 224.
*7* *8*
38. 1470.
0. 6.
32. • 91.
223. 25049.
5. 138.
*9* *10*
19. 0.
0. 0.
3. 0.
360. 0.
3. 0.
S.D.
697.
674.
533708.
45596.
110721.
S.D.
0.
76583.
17223.
10404.
2426.
S.D.
0.
874125.
130964.
91500.
22369.
*11*
0.
0.
0.
0.
0.
NUMBER
1.
19.
1<4.
109.
259.
NUKEER
1.
36.
25.
170.
170.
*12*
2691.
0.
1064.
22338.
628.
*2*
*3*
DISTRIBUTION OF ANNUAL O&M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
133.
0.
21 .
603.
26.
8.
0.
1.
216.
1.
343.
0.
8.
1566.
26.
64.
0.
3.
710.
7.
175.
1.
10.
893.
25.
108
0
13
1985
22
3.
0.
2.
12.
1.
51.
0.
3.
811.
5.
6.
0.
1.
75.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
107.
0.
44.
921.
26.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
WATER USE REGION 12
FLOW AT OBSERVED 1968 LEVEt
1968 FLOW CONDITIONS ( 1967 DOLLARS)
1*87
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
Uj COST RANGE
H* > 5000000.
IX) 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
6569.
0.
209.
13972.
844.
*2*
624.
1.
17.
U616.
48.
MAXIMUM
15000.
20529.
12246524.
1643703.
3199011.
O6M
12285075.
MINIMUM
5.
3.
12695.
767.
2379.
ANNUAL COST CF WASTE
REPLACEMENT
7919338.
AVERAGE
391.
379.
325230.
25226.
66528.
TREATMENT
INTEREST
12195776.
TOTAL
190533.
184617.
158386784.
12285075,
32399024.
TOTAL
32400176
DISTRIBUTION OF OPERATION AND KAINTENANCE COST
MAXIMUM
1643703.
412383.
95101.
U8073.
9689.
MINIMUM
742573.
104500.
51963.
10004.
767.
AVERAGE
1193137.
190459.
73185.
21423.
4286.
TOTAL
2386275.
4380553.
1683256.
2442180.
1392882.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
15308155.
4989713.
•996108.
478823.
99979.
DISTRIBUTION
*3* *4*
2483. 1837.
0. 0.
117. 47.
32342. 14725.
208. 167.
MINIMUM
5063841.
1018789.
503597.
100142.
15868.
OF TOTAL CAPITAL COST
*5* *6*
118. 1600.
3. 0.
17. 133.
1477. 24636.
18. 214.
AVERAGE
8422197.
2090409.
746029.
208870.
64360.
FOR TREATMENT ($ 1000)
*7* *8*
42. 1430.
0. 8.
39. 94.
117. 27965.
4. 188.
TOTAL
50533184.
64802704.
22380864.
48040176.
12228363.
*9* *-10*
15. 4019.
0. 0.
2. 3415.
288. 6830.
2. 855.
s.c.
994.
1456.
905113.
92885.
202518.
S C •
637196.
99130.
12545.
10713.
2104.
S.C.
3760890.
1159137.
158351.
97632.
21435.
*11*
2668.
0.
2668.
2668.
0.
NUMBER
2.
23.
23.
114.
325.
NUPEER
6.
31.
30.
230.
190.
*12*
5352.
0.
799.
28751.
986.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
363.
0.
18.
1219.
50.
18.
0.
1.
213.
1.
1027.
0.
17.
4722.
70.
192.
0.
4.
1263.
13.
97.
0.
8.
679.
17.
283
0
10
1847
30
4.
0.
3.
9,
1.
65.
0.
3.
910.
7.
4.
0.
0.
55.
1.
*10*
*12*
5.
0.
5.
10.
1.
213.
0.
213.
213.
0.
207.
0.
32.
1146.
38.
SD
OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 12
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 487
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000,
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
5483.
0.
179.
11969.
710.
*2*
575.
1.
14.
4043.
43.
MAXIMUM
15000.
v 18395.
10703240.
1U92168.
2851479.
QSM
10895992.
MINIMUM
5,
3.
12695.
767.
2379.
ANNUAL COST OF WASTE
REPLACEMENT
7347031.
DISTRIBUTION OF OPERATION
MAXIMUM
1492168.
412383.
96023.
48073.
9842.
MINIMUM
674541.
109477.
51586.
10004.
767.
AVERAGE
391.
329.
301726.
22374.
60691.
TREATMENT
INTEREST
11314423.
AND MAINTENANCE COST
AVERAGE
1083354.
209737.
69827.
20538.
4273.
TOTAL
190533.
160319.
146940640.
10895992.
29556352.
TOTAL
29557424
TOTAL
2166709.
3146062.
1815502.
2361817.
1405977.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
13379050.
4989713.
991593.
478823.
99979.
DISTRIBUTION
*3* *4*
2314. 1649.
0. 0.
103. 41.
28327. 12808.
184. 155.
MINIMUM
5063841.
1030590.
500739.
100665.
15868.
AVERAGE '
7891077.
1997180.
701306.
205683.
64231.
TOTAL
47346464.
57918240.
18233968.
47718480.
12460783.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
92. 1600.
3. 0.
16. 131.
1359. 24187.
14. 213.
*7* *8*
41. 1430.
0. 8.
38. 89.
114. 26313.
4. 175.
*9* *10*
15. 3601.
0. 0.
2. 3060.
283. 6120.
2. 766.
S.D.
994.
1329.
836568.
84474.
185486.
S.C.
578149.
110093.
13594.
10849.
2112.
S.E.
3248109.
1074352.
164293.
97970.
21347.
*11*
2668.
0.
2668.
2668.
0.
NUMBER
2.
15.
26.
115.
329.
NUMBER
6.
29.
26.
232.
194.
*12*
5352.
0.
799.
28751.
986.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*U* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
332.
0.
17.
1117.
46.
16.
0.
1.
199.
1.
930.
0.
14.
3849.
62.
174.
0.
3.
1093.
12.
62.
0.
6.
541,
12.
283
0
10
1815
30
3.
0.
3.
8.
1.
65.
0.
3.
853.
6.
4.
0.
0.
54.
1.
*10*
5.
0.
4.
9.
1.
*11*
213.
0.
213.
213.
0.
*12*
207.
0.
32.
1146.
38.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 12
FLOW OF LERST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 487
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
Ul COST RANGE
>-* > 5000000.
MR" 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
3071.
0.
126.
8459.
425.
*2*
i»39.
1.
12.
3276.
33.
MAXIMUM
15000.
12810.
7671*697.
1085523.
1979662.
O6M
8813055.
MINIMUM
5.
3.
12695.
756.
2379.
ANNUAL COST OF WASTE
REPLACEMENT
6351902.
DISTRIBUTION OF OPERATION
MAXIMUM
1085523.
491766.
91902.
48426.
9751.
MINIMUM
1085523.
102845.
52172.
10136.
756.
AVERAGE
391.
252.
260858.
18097.
51224.
TREATMENT
INTEREST
9781926.
AND KAINTENANCE COST
AVERAGE
1085523.
237587.
67149.
21201.
4185.
TOTAL
190533.
122529.
127038064.
8813055.
24945872.
TOTAL
24946880
TOTAL
1085523.
2851039.
1342985.
2035282.
1498287.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
9593371.
4380222.
999554.
492303.
99693.
DISTRIBUTION
*3* *4*
1835. 1220.
0. 0.
84. 31.
23197. 9733.
146. 119.
MINIMUM
5063841.
1030590.
508609.
100102.
15868.
AVERAGE
7687588.
2148469.
774550.
200731.
62638.
TOTAL
30750352.
53711728.
17814640.
42554944.
13968205.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
62. 1441.
3. 0.
14. 120.
1162. 22114.
10. 192.
*7* *8*
37. 1266.
0. 8.
34. 77.
103. 22712.
4. 148.
*9* *10*
14. 2891.
0. 0.
2. 2456.
259. 4912.
2. 615.
S.D.
994.
1011.
695309.
64741.
147941.
S.D.
0.
130177.
11268.
10577.
2234.
s.r.
1992582.
1106792.
160015.
95318.
21785.
NUMBER
1.
12.
20.
96.
358.
NUKEER
4.
25.
23.
212.
523.
*11*
2362.
0.
2362.
2362.
0.
*12*
5352.
0.
799.
28751.
986.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS ($ 1000)
*i)* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
246.
0.
14.
937.
35.
13.
0.
1.
178.
1.
671.
0.
10.
2792.
45.
126.
0.
3.
835.
9.
33.
0.
4.
373.
7.
242
0
9
1574
26
3.
0.
2.
7.
1.
55.
0.
2.
728.
5.
3.
0.
0.
48.
1.
*10*
4.
0.
4.
8.
1.
*11*
189.
0.
189.
189.
0.
*12*
207.
0.
32.
1146.
38.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
WATEH USE REGION 13
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
612
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1* *2*
MAX 933376. 5127.
WIN 0. 0.
AVE 13792. 102.
TOT 1337860. 40774.
SD 94967. 345.
MAXIMUM
12600.
469987.
1007273984.
13023192.
140946944.
O&M
8982U896.
MINIMUM
8.
1.
6625.
433.
1275.
ANNUAL COST OF WASTE
REPLACEMENT
106705376.
DISTRIBUTION OF OPERATION
MAXIMUM
13023192.
481396.
97999.
49549.
9958.
MINIMUM
501852.
103901.
50758.
10046.
433.
AVERAGE
424.
3364.
3487104.
146773.
589594.
TREATMENT
INTEREST
164326224.
AND MAINTENANCE CCST
AVERAGE
1554622.
271564.
73179.
21970.
5090.
TOTAL
259663.
2058532.
2134107904.
89824896.
360831488.
TOTAL
360856320
TOTAL
62184880.
19552592.
3219860.
3317418.
1552388.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
1259092480.
4676370.
997248.
496428.
99959.
DISTRIBUTION
*3* *4*
11186. 38936.
0. 0.
416. 407.
156886. 172206.
854. 2158.
MINIMUM
5066823.
1001 198.
503993.
100174.
8281.
AVERAGE
44924464.
2515852.
664641,
202775.
63874.
TOTAL
2380996608.
186173120,
33896672.
5.6776864.
9836521.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
765. 3344.
8. 0.
80. 248.
7834. 53826.
120. 495.
*7* *8*
74. 17886.
0. 10.
62. 42o.
311. 146951.
9. 1365.
*9* *10*
30. 10770.
0. 0.
3. 10770.
374. 10770.
3. 0.
S.D.
920.
21499.
1(1301152.
643278.
5827946.
S.E.
2043464.
108651.
13541.
11360.
25"?2.
s.n.
171672832.
1258987.
127803.
91971.
21561.
*11* *12*
0. 24531.
0. 0.
0. 4690.
0. 206339.
0. 5342.
NUMBER
40.
72.
44.
151.
305.
HUNEER
53.
74.
51.
280.
154.
*1*
*2*
*3*
DISTRIBUTION OF ANHWiL O6M TREATMENT COSTS ($ 1000)
*14* *5* *t>* *7* *g*
MAX
MIN
AVE
TOT
SD
1458.
0.
109.
10525.
181.
76.
0.
2.
855.
5.
3696.
0.
82.
30816.
248.
1390.
0.
21.
9008.
81.
3944.
2.
167.
16372.
465.
526
0
26
5739
73
16.
0.
10,
49.
4.
2459.
1.
25.
8455.
145.
11.
0.
1.
89.
1,
*10*
15.
0.
15.
15.
0.
* 11*
0.
0.
0.
0.
0.
*12*
911.
C.
180.
7901.
200.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 13
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 612
O1
»-»
C7>
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
21*662.
0.
876.
84958.
2889.
*2*
1305.
0.
34.
13398.
89.
MAXIMUM
12600.
75127.
41570496.
2527266.
7806717.
OSM
29496160.
MINIMUM
8.
1.
4296.
324.
869.
ANNUAL COST OF WASTE
REPLACEMENT
21438080.
AVERAGE
424.
764.
700591.
48196.
137177.
TREATMENT
INTEREST
33014640.
TOTAL
259663.
467691.
428761856.
29496160.
83952144.
TOTAL
83948880
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
2527266.
490134.
95969.
49756.
9955.
MINIMUM
599806.
101186.
50142.
10089.
324.
AVERAGE
973029.
206689.
72431.
21493.
4857.
TOTAL
9730287.
12608015.
1665913.
3847197.
1646661.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
51963120.
4930840.
987780.
496428.
98585.
DISTRIBUTION
*3* *4*
3376. 6390.
0. 0.
183. 86.
68992. 36201.
290. 360.
MINIMUM
5368195.
1002662.
512196.
100438.
5370.
OF TOTAL CAPITAL COST
*5* *6*
335. 1469.
6. 0.
40. 150.
3878. 32463.
50. 218.
AVERAGE
13409645.
2462025.
718846.
200983.
64834.
FOR TREATMENT ($ 1000)
*7* *8*
45. 5502.
0. 10.
38. 171.
190. 59094.
6. 423.
TOTAL
281602560.
150183536.
33066928.
58687104.
12448115.
*9* *10*
15. 4176.
0. 0.
2. 4176.
321. 4176.
2. 0.
S.D.
920.
3595.
2614712.
153388.
480834.
S.D.
571584.
95491.
14630.
10028.
2494.
S.D.
11689038.
1140039.
140296.
90479.
21984.
*11*
0.
0.
0.
0.
0.
NUMBER
10.
61.
23.
179.
339.
NUMBER
21.
61.
46.
292.
192.
*12*
14905.
0.
2844.
125114.
3239.
*2*
DISTRIBUTION OF ANNUAL O&M TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
5.
0.
1.
69.
1,
MAX
MIN
AVE
TOT
SD
322.
0.
42.
4041.
59.
18.
o.
1.
425.
1.
702.
0.
24.
9053.
58.
267.
0.
6.
2506.
17.
872.
1.
39.
3799.
102.
245.
0.
12.
2590.
29.
4.
0.
3.
13.
1.
346
1
6
2137
22
*10*
8.
0.
8.
8.
0.
*11*
0,
0.
0.
0.
0.
*12*
560.
0.
110.
4857.
123.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 13
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 612
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
Sj\ COST RANGE
H-» > 5000000.
•si 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000,
MAX
MIN
AVE
TOT
SD
*1*
6356.
0.
375.
36398.
975.
*2*
670.
0.
22.
8802.
50.
MAXIMUM
12600.
30784.
19248848.
1161824.
3321971.
OSM
19440384.
MINIMUM
8.
0.
3477.
290.
732.
ANNUAL COST OF WASTE
REPLACEMENT
14270053.
AVERAGE
424.
434.
466342.
31765.
90992.
TREATMENT
INTEREST
21975872.
TOTAL
259663.
265579.
285401088.
19440384.
55686928.
TOTAL
55686304
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
1161824.
466652.
96886.
49866.
9882,
MINIMUM
615914.
102196.
50817.
10104.
290.
AVERAGE
786124.
191416.
78542.
20627.
4418.
TOTAL
3930621.
8613723.
1963554.
3259040.
1674481.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
24061056.
4809508.
968443.
499571.
99937.
DISTRIBUTION
*3* *4*
1902. 2652.
0. 0.
133. 48.
50051. 20093.
191. 160.
MINIMUM
5028106.
1014334.
500238.
100019.
4346.
OF TOTAL CAPITAL COST
*5* *6*
224. 1253.
5. 0.
29. 129.
2822. 27918.
33. 182.
AVERAGE
10067286.
2330879.
681051.
204829.
63130.
FCP TREATMENT (5 1000)
*7* *8*
41. 3100.
0. 9.
34. 120.
171. 41501.
5. 250.
TOTAL
140942016.
1 18874864.
29285200.
51821760.
15845513.
*9* *10*
13. 3351.
0. 0,
2. 3351.
262. 3351.
2. 0.
S.E.
920.
1633.
1465304.
90316.
272907.
S.E.
236229.
93985.
14279.
9830.
2350.
S.E.
6069842.
979260.
132616,
100148.
22568.
NUMBER
5.
45.
25.
158.
379.
NUMBER
14,
5".
43.
253.
251.
*11*
0.
0.
0.
0.
0.
*12*
11203.
0.
2137.
94043.
2435.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O6M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
220.
0.
28.
2677.
40.
10.
0.
1.
338.
1.
376.
0.
15.
5719.
34.
120.
0.
4.
1566.
9.
418.
1.
20.
1966.
49.
194
0
9
2059
23
3.
0.
2.
11.
1.
145.
1.
4.
1368.
10.
4.
0.
0.
52.
0.
*10*
6.
0.
6.
6.
0.
*11*
0.
0.
0.
0.
0.
*12*
424.
0.
84.
3680.
93.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
WATER USE REGION 14
FLOW AT OBSERVED 19b8 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
77
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL 06M COST
TOTAL ANNUAL COST
MAXIMUM
12000.
3758.
2506495.
191160.
479757.
MINIMUM
16.
7.
23954.
1500.
4542.
AVERAGE
592.
461.
368851.
33898.
80743.
TOTAL
45602.
35478.
28401552.
2610161.
' 6217185.
S.C.
1508.
675.
434865.
45926.
97777.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
2610161.
1420077.
2186918.
TOTAL
6217156.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION flND KAINTENANCE COST
500000.
100000,
50000.
10000.
Ul COST RANGE
»-» > 5000000.
OO 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
*2*
MAXIMUM
0.
191160.
80702.
47104.
9965.
MAXIMUM
0.
3133118.
869362.
483935.
94601.
MINIMUM
0.
115825.
51593.
10662.
1500.
AVERAGE
0.
161513.
64304.
22190.
5126.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1001374.
503804.
100792.
29942.
AVERAGE
0.
1518770.
673622.
248426.
64435.
TOTAL
0.
1130591.
643043.
687901.
148644.
TOTAL
0.
16706471.
8757087.
8943352.
1095390.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *4* *5* *6* *7* *8* *9*
0. „
0.
0.
0.
0.
263.
2.
39.
1600.
60.
727.
0.
176.
8263.
197.
565
0
68
4036
109
34.
15.
24.
72.
10.
1101.
0.
268.
8051.
241.
0.
0.
0.
0.
0.
738.
18.
162.
6331.
148.
11.
0.
3.
49.
3,
+ 10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
S.E.
0.
24684.
13118.
10683.
2447.
S.E.
0.
684163.
113524.
109205.
22508.
NUKEER
0.
7.
10.
31.
29.
NUMBER
0.
11.
13.
36.
17.
* 12*
0.
0,
0.
0.
0.
MAX
MIN
AVE
TOT
SD
*1*
0.
0.
0.
0.
0.
*2*
*3*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS ($ 1000)
*4* +5* *6* *7* *8* *9*
5.
0.
1.
59.
1.
150.
0.
27.
1254.
40.
36.
0.
7.
394.
9.
15,
4.
9.
26.
6.
113
0
22
664
27
0.
0.
0.
0.
0.
25.
1.
5.
200.
4.
4.
0.
1.
12.
1.
SD OR S.D.
REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
-------
WATER USE REGION 14
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 77
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
12000.
3090.
1939824.
191160.
365143.
MINIMUM
16.
7.
23954.
1500.
4542.
AVERAGE
592.
357.
299141.
27854.
65845.
TOTAL
45602.
27460.
23033888.
2144748.
5070063.
S.D.
1508.
612.
380651.
43307.
88873.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
2144748.
1151694.
1773608.
TOTAL
5070050.
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAX
MIN
AVE
TOT
SD
*1*
*2*
MAXIMUM
0.
191160.
80702.
45795.
9828.
MAXIMUM
0.
2424780.
965441.
483935.
97759.
MINIMUM
0.
118786.
55691.
10701.
1500.
AVERAGE
0.
158020.
70724.
23540.
5057.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1256486.
526372.
102066.
29942.
AVERAGE
0.
1724912.
709999.
211806.
65537.
TOTAL
0.
948121.
424342.
564968.
207331.
TOTAL
0.
10349473.
9229989.
7836821.
1376285.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *(»* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
199.
2.
35.
1435.
55.
727.
0.
162.
7606.
192.
391
0
56
3293
94
28.
12.
19.
58.
8.
895.
0.
203.
6087.
213.
0.
0.
0.
0.
0.
651.
13.
116.
4511.
130.
10.
0.
3.
44.
3.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
S.D.
0.
28160.
9363.
12314.
2251.
S.D.
0.
469091.
162559.
104068.
22460.
NUMBER
0.
6.
6.
24.
41.
NUMBER
0.
6.
13.
37.
21.
*12*
0.
0.
0.
0.
0.
MAX
MIH
AVE
TOT
SD
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL O£M TREATMENT COSTS ($ 1000)
+4* *5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
5.
0.
1.
56.
1.
150.
0.
24.
1136.
39.
36.
0.
6.
332.
9.
10.
2.
6.
17.
4.
95.
0.
15.
452.
22.
0.
0.
0.
0.
0.
21.
1.
4.
141.
4.
4.
0.
1,
11,
1,
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHIY SKEWED.
-------
WATER USE REGION 14
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 77
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
12000.
2451.
15011101.
191160.
319230.
MINIMUM
16.
7.
23954.
1129.
4542.
AVERAGE
592.
296.
260619.
23698.
56797.
TOTAL
45602.
22795.
20067680.
1824768.
4373375.
S.D.
1508.
555.
337072.
40927.
81422.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1824768,
1003384.
15U5210.
TOTAL
4373361,
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
*2*
MAXIMUM
0.
191160.
87355.
38254.
9912.
MAXIMUM
0.
1880126.
782617.
484852.
98010.
MINIMUM
0.
107382.
69041.
10243.
1429.
AVERAGE
0.
160127.
77089.
20983.
U822.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
0. 0.
1256486. 1571909.
538501. 691154.
100317. 206098.
29942. 66718.
TOTAL
0.
800634.
308355.
503599.
212188,
TOTAL
0.
9431456.
6220382.
7831734.
1601240.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6* *7* *8* *9*
0.
0.
0.
0.
0.
179.
2.
31.
1282.
52.
727.
0.
143.
6735.
186.
339.
0.
48.
2826.
86.
24.
11.
17.
50.
7.
727.
0.
177.
5300.
176.
0.
0.
0.
0.
0.
541.
11.
98.
3834.
107.
10.
0.
3.
40.
3.
*10*
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
S.E.
0.
33491.
8510.
9483.
2217.
S.D.
0.
237942.
88511.
111595.
22743.
NUMBER
0.
5.
4.
24.
44.
NUMBER
0.
6.
9.
38.
24.
*12*
0.
0.
0.
0.
0.
MAX
MIN
AVE
TOT
SD
0.
0.
0.
0.
0.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
5.
0.
1.
51.
1.
150.
0.
21.
976.
38.
36.
0.
5.
291.
9.
8.
2.
4.
13.
3.
75
0
12
364
17
0.
0.
0.
0.
0.
17.
1.
3.
120.
3.
4.
0.
1.
10.
1.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
0.
0.
0.
0.
0.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHIY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
WATER USE REGION 15
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
58
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
MAXIMUM
2010.
7296.
4124562.
67U226.
1198045.
MINIMUM
3.
5.
24783.
1196.
4445.
AVERAGE
292.
610.
422399.
51881.
105526.
TOTAL
16939.
3539U.
24499168.
3009080.
6120482.
S.D.
477.
1440.
683593.
113060.
197304.
OEM
3009080.
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1224958.
1886435.
TOTAL
6120473.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
cn
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
674226.
393240.
83841.
47869.
9666.
MAXIMUM
5155702.
2734000.
726388.
482780.
99648.
MINIMUM
674226.
102360.
65484.
10575.
1196.
AVERAGE
674226.
259055.
74248.
29518.
4725.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM AVERAGE
5155702. 5155702.
1055777. 1591580.
521908. 571208.
103042. 222897.
30978. 56325.
TOTAL
674226.
1295275.
371239.
531323.
137026.
TOTAL
5155702.
15915807,
2856041.
5795326.
901203.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *14* *5* *6* *7* *8* *9*
3.
0.
2.
17.
1.
MAX
MIN
AVE
TOT
SD
1379.
0.
408.
1632.
647.
303.
2.
45.
1681.
69.
1348.
0.
226.
8124.
309.
697.
0.
98.
3626.
164.
46.
13.
22.
133.
14.
651.
0.
206.
4119.
182.
35.
0.
35.
35.
0.
406
8
99
3261
108
*10*
0.
0.
0.
0.
0.
S.E. NUMBER
0. 1.
109275. 5.
8047. 5.
12085. 18.
2575. 29.
S.D.
0.
534440.
86998.
108456.
21670.
*11*
0.
0.
0.
0.
0.
NUKEER
1.
10.
5.
26.
16.
*12*
1035.
0.
936.
1871.
141.
MAX
MIN
AVE
TOT
SD
*1*
158.
0.
54.
215.
69.
*2*
9.
0.
2.
63.
2.
*3*
411.
0.
47.
1709.
90.
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
77.
0.
11.
410.
19.
46.
3.
14.
82.
18.
64.
0.
16.
324.
19.
2.
0.
2.
2.
0.
20.
1.
4.
119.
4.
1.
0.
0.
3,
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
45.
0.
41.
81.
6.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED,
-------
WATER USE REGION 15
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 58
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSK COST
TOTAL ANNUAL COST
MAXIMUM
2010.
4905.
2837220.
<*76877.
837204.
MINIMUM
3.
5.
24783.
1196.
AVERAGE
292.
437.
345108.
39732.
83561.
TOTAL
16939.
25323.
20016272.
2304444.
4846511.
S.D.
477.
957.
512071.
81943.
144151.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
2304444.
1000814.
1541252.
TOTAL
4846509.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
0.
476877.
81371.
40601.
9429.
MAXIMUM
0.
3546525.
899527.
482780.
99648.
MINIMUM
0.
102360.
57165.
10406.
1196.
AVERAGE
0.
247293.
68171.
23016.
4457.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1359630.
726388.
101998.
30978.
AVERAGE
0.
1795031.
856242.
230894.
61599.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*4* *5* *6* *7* *8*
TOTAL
0.
1483759.
272683.
414290.
133717.
TOTAL
0.
14360255.
3424969.
6003237.
1231974.
MAX
MIN
AVE
TOT
SD
785.
0.
253.
1012.
355.
226.
2.
38.
1403.
56.
1048.
0.
185.
6644.
249.
471.
0.
72.
2647.
116.
39.
11.
20.
119.
12.
568.
0.
176.
3519.
153.
35.
0.
35.
35.
0.
312.
8.
83.
2751.
85.
3
0
2
15
1
*10*
0.
0.
0.
0.
0.
S.D.
0.
123614.
10047.
10255.
2343.
S.D.
0.
717166.
86569.
116941.
23819.
NUMBER
0.
6.
4.
18.
30.
NUMBER
0.
8.
4.
26.
20.
*11*
0.
0.
0.
0.
0.
*12*
1035.
0.
936.
1871.
141.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
114.
0.
41.
165.
48.
7.
0.
2.
56.
2.
288.
0.
35.
1277.
66.
54.
0.
8.
307.
14.
33.
2.
11.
66.
13.
48
0
12
248
13
2.
0.
2.
2.
0.
14.
1.
3.
99.
3.
0.
0.
0.
3.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
45.
0.
41.
81.
6.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 15
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS < 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 58
MANUFACTURING EMPLOYMENT
FLOW
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
2010.
3416.
2061881.
3U8207.
610066.
MINIMUM
3.
4.
22153.
1035.
3849.
AVERAGE
292.
315.
281514.
30796.
66548.
TOTAL
16939.
18276.
16327791.
1786153,
3859777.
S.C.
477.
708.
418276.
64716.
115004.
OSM
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
1786153.
816390.
1257239.
TOTAL
3859781,
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
cn
CO
CO
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
*2*
MAXIMUM
0.
348207.
87885.
31510.
8410.
MAXIMUM
0.
2577351.
755967.
413591.
97494.
MINIMUM
0.
100659.
50685.
10406.
1035.
AVERAGE
0.
214771.
71356.
18874.
4229.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MINIMUM
0.
1106108.
705804.
101985.
27691.
AVERAGE
0.
1590979.
717979.
197600.
61336.
TOTAL
0.
1073856.
283425.
283104.
143773.
TOTAL
0.
11136854.
3589894.
4149601.
1533396.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *i»* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
482.
0.
170.
679.
211.
188.
1.
31.
1152.
50.
834.
0.
151.
5420.
213.
372.
0.
54.
2013.
97.
28.
10.
16.
93.
8.
461
0
146
2926
124
32.
0.
32.
32.
0,
243.
6.
65.
2129.
60.
2.
0.
1.
13.
1.
*10*
0.
0.
0.'
0.
0.
S.C.
0.
93365.
16686.
8059.
2243.
S.C.
o.
477449.
21758.
92359.
23919.
*11*
0.
0.
0.
0.
0.
NUKEER
0.
5.
4.
15.
34.
NUWEER
0.
7.
5.
21.
25.
*12*
1035.
0.
936.
1871.
141.
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS <$ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
84.
0.
31.
126.
36.
6.
0.
1.
49.
2.
208.
0.
27.
981.
55.
45.
0.
7.
241.
12.
18.
2.
6.
39.
7.
35.
0.
9.
188.
10.
2.
0.
2.
2,
0.
11.
1.
2.
77.
2.
0,
0.
0,
2.
0.
*10*
0.
0.
0.
0.
0.
*11*
0.
0.
0.
0.
0.
*12*
45.
0.
41.
81.
6.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTSI..
WATER USE REGION 16
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
1089
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O£M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
3674.
0.
180.
14947.
485.
*2*
378.
0.
20.
15185.
36.
MAXIMUM
22000.
16666.
14700979.
1236938.
2928996.
OSM
31694784.
MINIMUM
4.
0.
2353.
292.
591.
ANNUAL COST OF WASTE
REPLACEMENT
21135152.
AVERAGE
533.
344.
388157.
29104.
78407.
TREATMENT
INTEREST
32548112.
TOTAL
579946.
374776,
422703104.
31694784.
85385056.
TOTAL
85378048
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
1236938.
489468.
99660.
49574.
9966.
MINIMUM
525777.
101716.
50187.
10075.
292.
AVERAGE
852469.
194918.
69647.
22302.
5295.
TOTAL
5967280.
7017065.
6198571.
9768163.
2747926.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
18376208.
4895670.
982193.
499478.
99290.
DISTRIBUTION
*3* *4*
2111. 3542.
0. 0.
128. 55.
79178. 40128.
166. 224.
MINIMUM
5681357.
1015347.
503048.
100153.
2941.
OF TOTAL CAPITAL COST
*5* *6*
164. 1966.
5. 0.
27. 207.
2920. 103296.
23. 236.
AVERAGE
11337340.
1907930.
687710.
236252.
64300.
FOR TREATMENT ($ 1000)
*7* *8*
43. 2726.
0. 11.
37. 153.
262. 98484.
4. 235.
TOTAL
102036064.
171713776.
99030240.
139152608.
16525111.
*9* *10*
12. 1960.
0. 0.
3. 1715.
760. - 3430.
2. 346.
S.E.
1315.
1077.
979660.
80621.
201420.
S.E.
294722.
90484.
14963.
10186.
2413.
S.E.
5125505.
959659.
133526.
107243.
20923.
NUKBER
7.
36.
89.
438.
519.
NUKEER
9.
90.
144.
589.
257.
*11*
5089.
0.
4679.
14037.
710.
*12*
9541.
0.
2089.
50127.
2208.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
183.
0.
19.
1601.
30.
7.
0.
1.
730.
1.
678.
0.
15.
9223.
37.
164.
0.
5.
3344.
12.
197.
1.
13.
1446.
25.
276
0
16
8062
29
3.
0.
2.
14.
0.
113.
1.
5.
3239.
9.
4.
0.
1.
169.
1.
*10*
4.
0.
4.
8.
1.
*11*
683.
0.
629.
1888.
93.
*12*
364.
0.
82.
1974.
84.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHIY SKEWED.
-------
WATER USE REGION 16
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
_ _ 1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1089
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
MAXIMUM
22000.
16666.
14700979.
1236938.
2928996.
MINIMUM
4.
0.
2353.
292.
591.
AVERAGE
533.
304.
357383.
26479.
71873.
TOTAL
579946.
331031.
389189632.
28836032.
78269536.
S.D.
1315.
1063.
973112.
80080.
200127.
O6M
ANNUAL COST OF WASTE TREATMENT
REPLACEMENT INTEREST
28836032.
19459472.
29967584.
TOTAL
78263088.
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
yi COST RANGE
M > 5000000.
Wt 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
*1*
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM MINIMUM AVERAGE TOTAL
1236938. 525777. 852469. 5967280.
489468. 103765. * 199916. 6397303.
99113. 50092. 67557. 4796557.
49574. 10009. 21032. 8896557.
9966. 292. 5004. 2782373.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM MINIMUM AVERAGE TOTAL
18376208. 5681357. 11337340. 102036064.
4895670. 1012156. 1902076. 152166128.
992309. 501252. 690370. 75250352.
497698. 100153. 229795. 139025792.
99290. 2941. 63216. 18079840.
DISTRIBUTION OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*3* *n* *5* *6t *7* *8* *9*
*10*
S.D. NUMBER
294722. 7.
92578. 32.
14262. 71.
10412. 423.
2380. 556.
S.D.
5125505.
987608.
136528.
104573.
21053.
*11*
NUMBER
9.
80.
109.
605.
286.
*12*
MAX
MIN
AVE
TOT
•D
3674.
0.
180.
14947.
485.
346.
0.
19.
14132.
33.
2111.
0.
120.
73991.
161.
3542.
0.
49.
35706.
222.
164.
5.
26.
2806.
24.
1966.
0.
184.
91605.
226.
43.
0.
37.
262.
4.
2726.
11.
136.
87486.
230.
12.
0.
2.
705.
2.
1960.
0.
1715.
3430,
346.
5089.
0.
4679.
14037.
710.
9541.
0.
2089.
50127.
2208.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*!»* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
183.
0.
19.
1601.
30.
7.
0.
1.
703.
1.
678.
0.
14.
8397.
36.
164.
0.
4.
2943.
12.
197.
1.
13.
1387.
25.
276
0
14
6882
28
3.
0.
2.
14.
0.
113.
1.
4.
2888.
8.
4.
0.
1.
153.
1.
*10*
4.
0.
4,
8.
1.
*11*
683.
0.
629.
1888.
93.
*12*
364.
0.
82.
1974.
84.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 16
FLOW OF LEAST EFFICIENT TWO^THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 1089
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OgM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
3674.
0.
15"6.
12964.
473.
*2*
254.
0.
15.
11081.
25.
MAXIMUM
22000.
12743.
14700979.
1017048.
2603061.
OSM
22627920.
MINIMUM
4.
0.
2353.
292.
591.
ANNUAL COST OF WASTE
REPLACEMENT
16422117.
AVERAGE
533.
218.
301600.
20779.
59087.
TREATMENT
INTEREST
25290048.
TOTAL
579946.
237779.
328442368.
22627920.
64345952.
TOTAL
64340080
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
1017048.
489468.
99802.
49009.
9991.
MINIMUM
538860.
101008.
50005.
10057.
292.
AVERAGE
810912.
190423.
65489.
20211.
4924.
TOTAL
4054561.
51411416.
2750519.
7518540.
3166174.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
18376208.
4895670.
977296.
499246.
99663.
DISTRIBUTION
*3* *I4*
1376. 2718.
0. 0.
97. 36.
60240. 26012.
123. 166.
MINIMUM
5681357.
1013609.
501252.
100153.
2941.
AVERAGE
10887494.
1867851.
703878.
222719.
63833.
TOTAL
87099952.
113938912.
56310240.
130736144.
22532976.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*
110. 1695.
4. 0,
20. 158.
2168. 78902.
16. 193.
*7* *8*
43. 2294.
0. 7.
37. 110.
262. 70879.
4. 182.
*9* *10*
9. 1960.
0. 0.
2. 1715.
606. 3430.
2. 346.
S.D.
1315.
757.
866878.
64959.
172484.
S.D.
205471.
94071.
14312.
9798.
2475.
o r
4554546.
896178.
139616.
100991.
22980,
NUMBER
5.
27.
42.
372.
643.
NUMBER
8.
61.
80.
587.
353.
*11*
4282.
0.
3937.
11811.
597.
*12*
9541.
0.
2089.
50127.
2208.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OgM TREATMENT COSTS <$ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
183.
0.
17.
1413.
30.
7.
0.
1.
625.
1.
370.
0.
10.
6012.
23.
129.
0.
3.
2206.
9.
95.
0.
7.
816.
12.
222.
0.
11.
5514.
22.
3.
0.
2.
14.
0.
89.
1.
4.
2330.
6.
3.
0.
0.
123.
0.
*10*
4.
0.
4.
8.
1.
*11*
577.
0.
532.
1595.
79.
*12*
364.
0.
82.
1974.
84.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
TOTAL NUMBER OF MANUFACTURING PLANTS...
WATER USE REGION 17
FLOW AT OBSERVED 1968 LEVEL
1968 FLOW CONDITIONS ( 1967 DOLLARS)
450
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL OSM COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
COST RANGE
> 5000000.
1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000,
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
953.
0.
161.
2417.
248.
*2*
269.
1.
34.
6758.
49.
MAXIMUM
31000.
105627.
52907440.
3956620.
10675863.
OSM
42486288.
MINIMUM
15.
6.
22206.
1434.
4264.
ANNUAL COST OF WASTE
REPLACEMENT
29140416.
DISTRIBUTION OF OPERATION
MAXIMUM
3956620.
452282.
97956.
49874.
9791.
MINIMUM
538955.
101703.
51639.
10046.
1434.
AVERAGE
468.
1946.
1295130.
94414.
258899.
TREATMENT
INTEREST
44876224.
AND MAINTENANCE COST
AVERAGE
1539488.
194775.
67522.
26045.
5328.
TOTAL
210695.
875624.
582808576.
42486288.
116504464.
TOTAL
116502928
TOTAL
23092320.
9738763.
2970975.
6120469.
564820.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
66134288.
4959988.
999361.
497758.
99104.
DISTRIBUTION
*3* *y*
1763. 21838.
0. 0.
222. 450.
31129. 128640.
288. 1970.
MINIMUM
5136670.
1041225.
508154.
100886.
27758.
AVERAGE
19986656.
2023961.
723722.
252692.
70548.
TOTAL
419719936.
157868960.
107110928.
40936112.
2892484.
OF TOTAL CAPITAL COST FOR TREATMENT ($ 1000)
*5* *6*-
109. 6101.
6. 0.
26. 469.
866. 137889.
21. 711.
*7* *8*
60. 8930.
0. 18.
53. 387.
105. 136839.
11. 898.
*9* *1Q*
18. 11110.
0. 0.
4. 7928.
216. 47570.
3. 2735.
S.E.
1662.
8891.
4273298.
336696.
871068,
S.E.
1089630.
95422.
13485.
10574.
2171.
S.C.
15986956.
1007450.
133035.
118459.
21129.
NUKEER
15.
50.
44.
235.
106.
NUKEER
21.
78.
148.
162.
41.
*11*
16679.
0.
8102.
81022.
4371.
*12*
2657.
0.
1338.
9368.
703.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
130.
0.
23.
341.
33.
8.
0.
1.
248.
1.
539.
0.
37.
5190.
74.
687.
0.
22.
6362.
69.
85.
1.
13.
416.
20.
1882,
0.
54.
15739.
155.
*10*
*11*
*12*
5.
0.
4.
8.
2.
565.
1.
15.
5373.
52.
8.
0.
1.
51.
1.
17.
0.
13.
76.
4.
1735.
0.
830.
8298.
463.
108.
0.
55.
383.
28.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 17
FLOW LESS THAN OR EQUAL TO MEDIAN OF WATER USE REGIONS
1968 FLOW CONDITIONS ( 1967 DOLLARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 450
MANUFACTURING EMPLOYMENT
FLOW (MGY)
TOTAL CAPITAL COST
TOTAL ANNUAL O6M COST
TOTAL ANNUAL COST
COST RANGE
> 500000.
100000. TO
50000. TO
10000. TO
0. TO
500000.
100000.
50000.
10000.
y\ COST RANGE
to > 5000000.
OS 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0. TO 100000.
MAX
MIN
AVE
TOT
SD
*1*
373.
0.
116.
1736.
127.
*2*
196.
1.
26.
5006.
36.
MAXIMUM
31000.
45250.
27730240.
2068368.
5590107.
OSM
22689632.
MINIMUM
15.
4.
18786.
1189.
3585.
ANNUAL COST OF WASTE
REPLACEMENT
16530200.
AVERAGE
468.
851.
734676.
50421.
143729.
TREATMENT
INTEREST
25456496.
TOTAL
210695.
382869.
330604032.
22689632.
64677920.
TOTAL
64676320.
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
2068368.
423465.
98921.
49855.
9968.
MINIMUM
526845.
10Ht»96.
50137.
10020.
1189.
AVERAGE
1031237.
184566.
76440.
19559.
5638.
TOTAL
10312369.
5352418.
1987446.
4029156.
1009236.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
34662800.
1)591495.
933277.
490012.
98016.
DISTRIBUTION
*3* *4*
895. 9470.
0. 0.
159. 196.
22305. 56043.
189. 855.
MINIMUM
6671221.
1053844.
500127.
101129.
23483.
OF TOTAL CAPITAL COST
*5* *6*
97. 3816.
6. 0.
22. 291.
714. 85590.
18. 449.
AVERAGE
13406343.
2112698.
681666.
274788.
64796,
FOR TREATMENT ($ 1000)
*7* *8*
49. 5177.
0. 12.
43. 224.
86. 79260.
9. 522.
TOTAL
201095152.
92958736.
42944960.
71994560.
4276550.
*9* *10*
18. 5458.
0. 0.
3. 3895.
175. 23368.
3. 1344.
S.D.
1662.
3811.
2267610.
174444.
459128.
S.D.
552849.
78296.
14191.
9868.
2737.
S.D.
8476502.
903753.
130555.
110929.
20548.
NUMBER
10.
29.
26.
206.
179.
NUMBER
15.
44.
63.
262.
66.
*11*
9668.
0.
4696.
46961.
2533.
*12*
2657.
0.
1338.
9368.
703.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL 06M TREATMENT COSTS ($ 1000)
*4* *5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
72.
0.
18.
275.
21.
5.
0.
1.
208.
1.
207.
0.
22.
3081.
38.
321.
0.
11.
3005.
32.
65.
1.
9.
287.
14.
937
0
27
7799
77
*10*
*11*
*12*
3.
0.
3.
5.
1.
243.
1.
8.
2688.
23.
8.
0.
1.
41.
1.
10.
0.
7.
45.
2.
1019.
0.
487.
4873.
272.
108.
0.
55.
383.
28.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHLY SKEWED.
-------
WATER USE REGION 17
FLOW OF LEAST EFFICIENT TWO-THIRDS OF WATER USE REGIONS MODIFIED
1968 FLOW CONDITIONS ( 1967 D01LARS)
TOTAL NUMBER OF MANUFACTURING PLANTS... 450
MANUFACTURING EMPLOYMENT
FLOW 500000.
100000. TO 500000.
50000. TO 100000.
10000. TO 50000.
0. TO 10000.
U1 COST RANGE
CO > 5000000.
«3 1000000. TO 5000000.
500000. TO 1000000.
100000. TO 500000.
0, TO 100000.
MAX
MIN
AVE
TOT
SD
371.
0.
95.
106.
*2*
148.
1.
20.
3866.
27.
MAXIMUM
31000.
33981.
22402384,
1668232.
4513334.
QSM
18357488.
MINIMUM
15.
3.
16220.
1014.
3086.
ANNUAL COST OF WASTE
REPLACEMENT
13915711.
AVERAGE
468.
651.
618476.
40794.
119341.
TREATMENT
INTEREST
21430176.
TOTAL
210695.
292830.
278314240.
18357488.
53703648.
TOTAL
53703360
DISTRIBUTION OF OPERATION AND MAINTENANCE COST
MAXIMUM
1668232.
468091.
89950.
47844.
9968.
MINIMUM
560223.
102812.
50485.
10020.
1014.
AVERAGE
924841.
186718.
70285.
18872.
5490.
TOTAL
7398725,
4667942.
1757132.
3359234.
1174858.
DISTRIBUTION OF INVESTMENT REQUIREMENTS
MAXIMUM
28002976.
4385741.
990183.
490069.
98961.
DISTRIBUTION
*3* *4*
785. 7141.
0. 0.
125. 150.
17561. 42760.
154. 644.
MINIMUM
5409001.
1002785.
500791.
100429.
20275.
OF TOTAL CAPITAL COST
*5* *6*
65. 3256.
6. 0.
18. 259.
595. 76267.
12. 381.
AVERAGE
10902396.
1874120.
678686.
276969.
65497.
FOR TREATMENT ($ 1000)
*7* *8*
45. 4307.
0. 10.
39. 193.
78. 68453.
8. 433.
TOTAL
163535952.
74964832.
33934288.
69242272.
6222245.
*9* *10*
9. 4380.
0, 0.
2. 3126.
131. 18755.
2. 1078,
S.t.
1662.
2861.
1840935.
140113.
371519.
S.E.
447337.
99408.
11934.
8570.
2785.
S.D.
6831693.
774897.
128585.
107570.
22019.
NOKEER
8.
25.
25.
178.
214.
NUKEER
15.
40.
50.
250.
95.
*11*
8040.
0.
3906.
39058.
2107.
*12*
2657.
0.
1338.
9368.
703.
*1*
*2*
*3*
DISTRIBUTION OF ANNUAL OSM TREATMENT COSTS ($ 1000)
*5* *6* *7* *8* *9*
MAX
MIN
AVE
TOT
SD
54.
0.
16.
240.
17.
5.
0.
1.
180.
1.
171.
0.
16.
2211.
29,
248.
0.
8.
2357.
25.
31.
1.
6.
200.
8.
740.
0.
22.
6416.
61.
2.
0.
2.
4.
1.
185.
1.
6.
2232.
17.
3.
0.
0.
26.
1.
*10*
*11*
*12*
8,
0.
6.
38,
2.
851.
0.
407.
4071.
227.
108.
0.
55.
383.
28.
SD OR S.D. REPRESENTS STANDARD DEVIATION. THE DATA DISTRIBUTION USED IS HIGHIV SKEWED.
-------
REGIONAL INDUSTRIAL WATER USE PER EMPLOYEE
BY
STANDARD INDUSTRIAL CODE
531
-------
Regional Industrial Water Use Per Employee By SIC Code
A central component of the industrial cost model to define required
treatment by industry was a mechanism to relate industrial activity as
measured by types, employment sizes, and locations of industries to waste
generated by these industries. Waste generation was measured in terms of
quantity (flow) by an analysis of The 1967 Census of Manufactures, Water
Use In Manufacturing to determine water use per manufacturing employee dis-
criminated by type of industry (4-digit SIC code) and location (water use
region—elsewhere defined).
Many industries do not use a significant amount of water in their process.
These industries were not included in the analysis. Where a four-digit
or two-digit code is missing, an insignificant amount of process water use
is indicated for the industry or major industry group.
In a number of cases regional water use per employee data was not availa-
ble, therefore data from other regions was substituted. The following
table shows all cases where analysis was made using substitute data.
532
-------
INTRODUCTION TO WATER USE PER EMPLOYEE TABLES
In a number of cases regional data unavailability made necessary the use of data from other regions where data was available. The following table shows all
cases where analysis was made using substitute data from other regions.
en
CO
CO
SIC
20
22
24
26
28
29
30
31
32
33
34
35
36
37
TYPE OF INDUSTRY
Food and Kindred Products
Textile Mill Products
Lumber and Wood Products,
Except Furniture
Paper and Allied Products
Chemicals and Allied Products
Petroleum Refining and Related
Industries
Rubber and Miscellaneous Plastics
Leather and Leather Products
Stone, Clay, Glass, and Concrete
Primary Metal Industries
Fabricated Metal Products, Except
Ordinance, Machinery, and Trans-
portation Equipment
Machinery, Except Electrical
Electrical Machinery, Equipment,
and Supplies
Transportation Equipment
DATA FROM REGION
Number Name
ALL DATA PRESENT
1 New. Eng.
4 E. Gr. Lks.
9 Upp. Miss.
16 Calif.
5 Oh. Riv.
8 W. Gr. Lk.
7 S.E.
12 Ark. W&R
16 Calif.
11 Mo.
14 Colo.
2 Del /Hud.
5 Oh. Riv.
16 Calif.
1 New. Eng.
5 Oh. Riv.
7 S.E.
12 Ark. W&R
8 W. Gr. Lks.
5 Oh. Riv.
16 Calif.
ALL DATA PRESENT
7 S.E.
1 New. Eng.
12 Ark. W&R
1 New Eng.
11 Mo.
1 New Eng.
7 S.E.
11 Mo.
7 S.E.
12 Ark. W&R
SUBSTITUTED FOR THESE REGIONS
1 Name 1 Name # Name # Name 1 Name 1 Name f Name 1 Name
17 Pac. N.W
8 W. Gr. Lk.
13 W. Gf. 12 Ark. 11 Mo.
14 Colo. 15 Gr. Bn.
1 N. Eng. 2 Del/Hud. 3 Ches. Bay
9 Upp. Miss.
6 Cumb/Tenn.
11 Mo.
15 Gr. Bn. 14 Colo.
14 Colo. 15 Gr. Bn.
15 Gr. Bn.
3 Ches. Bay 1 New Eng.
6 Cumb/Tenn.
14 Colo. 15 Gr. Bn.
17 Pac. N.W.
6 Cumb/Tenn.
13 W. Gf.
11 Mo. 14 Colo. 15 Gr. Bn.
4 E. Gr. Lks.
6 Cumb/Tenn. 7 S.W. 9 Upp. Miss. 10 Low Miss. 11 Mo. 12 Ark. 13 W. Gf. 17 Pac. N.W.
14 Colo. 15 Gr.Bn.
10 Low Miss.
17 Pac. N.W.
14 Colo. 15 Gr. Bn.
17 Pac. N.W.
14 Colo. 15 Gr. Bn.
17 Pac. N.W.
13 W. Gr. Lk.
14 Colo. 15 Gr. Bn.
10 Low Miss.
11 Mo. 14 Colo. 15 Gr. Bn.
-------
INDUSTRIAL WATER USE REGIONS
en
OJ
01
-------
CODES FOR WATER USE REGIONS
Code Region
1 New England
2 Delaware Hudson
3 Chesapeake Bay
4 Eastern Great Lakes
5 Ohio
6 Cumberland and Tennessee
7 Southeast
8 Western Great Lakes
9 Upper Mississippi
10 Lower Mississippi
11 Missouri
12 Arkansas-White and Red
13 Western Gulf
14 Colorado
15 Great Basin
16 California
17 Pacific Northwest
536
-------
TABLE 1A
USE PER EMPLOYEF (PILLION GALLONS PER' YEAR) FOR FACH WATER USE REGION AND SIC CODE
RFGION NUMBER
"SIC *1* *2* *3* *4* *5* *6* *7* *8* *9* *10* *ll* *12* *13* *14* *15* *16* *17*
20 0.316 0.514 0.305 0.545 0.353 0.457 O.o36 0.515 0.699 0.740 0.959 0.641 0.7C5 1.250 0.658 0.892 1.221
701 0.755 0.415 0.246 0.?86 0.785 0.234 0.513 0.415 0.564 0.597 0.612 0.328 0.361 0.640 0.531 0.513 0.625
2011 0.253 0.412 0.244 0.3CO 0.283 0.246 0.5C9 0.412 0.560 0.592 0.643 0.345 0.379 0.673 0.527 0.540 0.657
2013 0.137 0.724 0.133 0.173 0.154 0.141 0.276 0.224 0.3C4 0.322 0.369 0.198 0.218 0.386 0.266 0.310 0.377
2015 0.759 0.471 0.249 0.789 0.789 0.237 0.520 0.421 0.572 0.605 0.620 0.332 0.365 0.648 0.538 0.520 0.633
20? 0.135 0.220 0.130 0.?33 0.151 0.240 0.771 0.220 0.299 0.316 0.410 0.297 0.427 0.812 0.261 0.381 0.667
2021 0.184 0.300 0.178 0.318 0.206 0.328 0.371 0.300 0.408 0.431 0.559 0.405 0.583 2.061. 0.384 0.520 0.910
2022 1.098 0.160 0.095 0.169 0.110 0.175 0.198 0.160 0.217 0.230 0.298 0.216 0.311 0.836 0.2C5 0.278 0.486
2073 0.167 0.771 0.161 0.287 0.186 0.297 0.335 0.271 0.369 0.390 0.506 0.366 0.527 1.864 0.347 0.471 0.823
2074 0.132 0.715 0.127 0.227 0.148 1.235 0.266 0.215 0.292 0.309 0.401 0.290 0.3S1 0.693 0.275 0.373 0.652
2026 0.133 0.216 0.128 0.729 0.148 0.204 0.267 0.216 Q.2^4 0.311 0.403 0.287 0.315 0.559 0.216 0.375 0.547
203 0.390 0.635 0.376 0.475 0.436 0.347 0.785 0.635 0.863 0.914 0.909 0.487 0.536 0.951 0.813 0.763 0.929
2031 0.179 0.292 0.173 0.252 0.200 P.2C6 0.361 0.292 0.397 0.420 0.540 0.289 0.318 0.564 0.373 0.453 0.551
203? 0.3C6 0.497 0.295 0.333 0.34^ 0.273 O.olS 0.497 0.676 0.715 0.713 0.382 0.420 0.746 0.636 0.599 0.729
2033 1.35? 0.540 0.339 0.331 0.393 0.271 0.708 0.5t>2 0.751 0.824 0.709 0.380 0.418 0.741 0.733 0.595 0.724
7034 0.601 0.650 0.579 0.399 0.503 0.326 0.862 0.67H 0.905 1.405 0.854 0.458 0.503 0.893 1.149 0.717 0.872
7035 0.145 0.736 0.140 0.188 0.162 0.154 0.292 U.736 0.3^1 0.340 0.402 0.216 0.237 0.421 0.3C2 0.338 0.411
-------
SIC
TABLE 1A
WATFP. USF PFR EMPLOYEE (MILLION GALLONS PER YEAR) FOR EACH WATER USE REGION AND SIC CODE
*4*
RFGION NUMBER
*6* *7* *8* *9*
*11* *12* *13* *14» *15* *16* *17*
7036 O.r»12 0.701 O.S94 0.574 1.069 0.865 1.176 1.244 1.502 0.805 0.885 1.570 1 .1C6 1.260 1.535
?04
0.776 0.367 0.217 0,389 0.752 0.402 0.454 0.367 0.499 0.528 n.685 0.496 0.713 1.999 0.470 0.637 1.114
2041 %084 0.136 0.081 O.I44 0.093 0.149 0.168 0.136 0.185 0.196 0.254 0.184 0.264 0.796 0.174 0.236 0.413
7042 1.126 0.714 0.121 0.216 0.140 0.224 0.253 0.204 0.778 0.294' 0.381 0.276 0.397 0.803 0.261 0.355 0.620
?04^ 0..137 0.059 0.035 0.0.224 0.357 0.403 0.326 0.443 0.469 0.608 0.440 0.633 2.239 0.417 0.565 0.989
?.7S6 I.f34 1.789 1.P94 1.464 3.408 2.758 .5.748 3.966 3.831 2.053 2.258 4.006 3.527 3.215 3.915
O.H7 0.069 0.124 0.050 0.128 0.145 0.117 0.15« 0.168 0.218 0.158 0.?27 0.711 0.150 0.203 0.355
O.'i«3 ".13? O.C80 0.119 0.09? 0.097 0.166 0.135 O.IH3 0.194 0.251 0.136 0.150 0.266 0.172 0.213 0.260
0 740 0.4'}^ 0. 74O f^.429 0.27R ".383 0.501 •~).406 1.551 0.583 0.756 0.538 0.592 1.049 0.519 0.703 1.025
-------
TABLE 1A
WATFR USE PFR EMPLOYEE (MLLlriN GALLONS PFR YEAR) FOR EACH HATER USE REGION AND SIC CODE
REGION NUMBER
SIC *1* *2* *3* *4* *5* *6* *7* *8* *9* *10* *11* *12* *13* *14* *15* *16* #17*
2082 0.304 0.495 0.393 0.507 0.340 0.415 0.612 0.495 0.673 0.712 0.923 0.582 C.640 1.136 0.633 0.859 I.110
2083 2.608 4.086 2.514 2.505 2.915 ?.C49 5.246 4.245 5.686 6.105 5.364 2.875 3.162 5.608 5.429 4.502 5.480
tn
ca
2084 0.521 0.848 0.503 0.592 0.533 0.485 1.049 0.849 1.154 1.221 1.268 0.680 0.747 1.326 1.086 1.064 1.296
2085 0.053 0.096 0.051 0.091 0.059 0.094 0.106 0.086 0.117 0.123 0.160 0.116 0.167 0.589 0.110 0.149 0.260
2086 0.100 0.163 0.097 0.114 0.112 0.093 0.202 0.163 0.222 0.235 0.243 0.130 0.143 0.254 0.2C9 0.204 0.249
2087 0.066 0.108 0.064 0.114 0.074 0.118 0.134 0.108 0.147 0.155 0.202 0.146 0.210 0.463 0.138 0.187 0.328
209 0.405 0.659 0.391 0.672 0.453 0.550 0.315 0.660 0.896 0.949 1.230 0.772 0.849 1.506 0.844 1.144 1.471
2092 0.491 O.ROO 0.47'+ 0.847 0.549 0.875 0.989 0.800 1.087 1.150 1.491 1.080 1.441 2.557 1.023 1.388 2.428
2093 0.209 0.340 0.202 0.360 0.234 0.373 0.421 0.341 0.463 0.490 0.635 0.460 0.662 2.340 0.436 0.591 1.034
2094 0.328 0.533 0.316 0.564 0.366 0.583 0.659 0.533 0.725 0.767 0.994 0.720 1.036 2.131 0.662 0.925 1.619
2095 0.088 0.143 0.084 0.151 0.098- 0.141 0.176 0.143 0.194 0.205 0.266 0.193 0.217 0.386 0.162 0.247 0.377
2096 0.166 0.270 0.160 0.286 0.185 0.295 0.333 0.270 0.367 0.388 0.503 0.364 0.524 1.572 0.345 0.468 0.819
2097 0.583 0.948 0.562 1.004 T.651 1.038 1.172 0.9*9 1.289 1.364 1.769 1.281 1.843 6.460 1.213 1.645 2.879
2099 0.455 0.740 0.438 0.532 0.508 0.436 0.915 0.740 1.006 1.064 1.140 0.611 0.672 1.192 0.947 0.957 1.165
22 0.447 0.471 0.284 0.200 0.396 0.293 0.303 0.200 0.268 0.339 0.?68 0.268 0.268 0.444 0.444 0.444 0.447
2211 0.350 0.297 0.179 n.126 0.259 0.185 0.192 0.126 0.184 0.214 0.184 0.184 0.184 0.281 0.281 0.281 0.350
2221 0.319 0.261 0.157 0.111 0.227 0.162 0.168 0.111 0.16? 0.188 0.162 0.162 0.162 0.246 0.246 0.246 0.319
-------
TABLE 1A
dATFR USE PFR FMPLOYFF (MILLION GALLONS PFR YEAR) FOR FACH WATER USE REGION AND SIC CODE
*1*
*4*
*7*
RFGION NUMBER
*IQ*
*12* *13* *14* *15*
* 1 7*
22M 0.59? 0.646 0.396 0.557 0.524 0.428 0.542 0.357 0.354 0.606 0.354 0.354 0.354 0.653 0.653 0.653 0.592
2241 0. 145 0.159 0.097 n.104 0.129 0.105 0.157 0.104 0.087 0.176 0.087 0.087 0.087 0.161 0.161 0.161 0.145
225 0.143 0.156 0.095 0.108 0.126 0.103 0.163 0.108 0.085 0.183 0.085 0.085 0.085 0.158 0.158 0.158 0.143
2?51 O.OS9 0.064 0.039 0.061 0.052 0.043 0.077 O.Ohl 0.035 0.103 0.035 0.035 0.035 0.065 0.065 0.065 0.059
cn
2?5? 0.076 0.083 0.051 0.058 0.067 0.055 0.088 0.053 0.046 0.098 0.046 0.046 0.046 0.084 0.084 0.084 0.076
2253 0.117 0.12R O.C79 0.092 0.104 0.085 0.139 0.092 0.070 0.156 0.070 0.070 0.070 0.130 0.130 0.130 0.117
0.101 1.110 0.068 0.071 0.090 0.073 0.108 0.071 0.061 0.121 0.061 0.061 0.061 0.112 0.112 0.112 0.101
?256 0.360 0.392 0.240 0.251 0.318 0.260 0.381 0.251 O.?15 0.426 0.215 0.215 0.215 0.357 0.3S7 0.397 0.360
226 0.94^ 0.973 0.566 0.607 0.749 0.612 0.920 0.607 0.507 1.029 0.507 0.507 0.507 0.934 0.934 0.934 0.846
2261 0.796 0.369 0.53? 0. 572 0.705 0.576 0.867 0.572 0.477 0.970 0.477 0.477 0.477 0.879 0.879 0.879 0.796
2262 1.086 1.186 0.72? 0.767 0.962 0.786 1.164 0.767 0.651 1.301 0.651 0.651 0.651 1.199 1 . 1 S9 1.199 1.086
226° 0.5R1 0.635 0.^89 0.430 0.515 0.421 0.653 0.430 0.348 0.730 0.348 0.348 0.348 0.642 0.642 0.642 0.581
227 0.498 0.544 0.333 0.234 3.441 0.344 0.356 0.234 0.298 0.398 0.298 0.298 0.2S8 0.521 0.521 0.521 0.498
227? 0.391 0.427 0.262 0.?53 0.346 0.283 0.384 0.253 0.234 0.429 0.234 0.234 0.234 0.432 0.432 0.432 0.391
2?8 0.439 0.400 0.241 0.170 0.^49 0.249 0.258 0.170 0.248 0.2R8 0.248 0.248 0.248 0.378 0.318 0.378 0.489
22H1 0.285 0.233 0.140 0.099 O.?03 0.145 0.150 0.099 0.144 0.168 0.144 0.144 0.144 0.220 0.220 0.220 0.285
2282 0.124 0.135 0.083 0.113 0.110 O.090 0.162 0.113 0.074 0.192 O.074 0.074 0.074 0.137 0.137 O. 137 0.12*
-------
TABLE 1A
WATER USE PER EMPLOYEE (PILLION GALLONS PER YEAR) FOR EACH WATER USE REGION AND SIC CODE
RFGION NUMBER
SIC *1* *2* *3* *4* *5* *6* *7* *8* *9* *10* *ll* * 12* *13* *14* *15* *16* *17*
2283 0.220 0.241 0.147 0.231 0.195 0.160 0.283 0.231 0.132 0.391 0.13? 0.132 0.132 0.243 0.243 0.243 0.220
2284 0.379 0.414 0.753 0.375 0.335 0.274 0.495 0.375 0.227 0.636 0.227 0.227 0.227 0.418 0.418 0.418 0.379
-,
229 0.349 0.358 0.216 0.152 0.309 0.223 0.231 0.15? 0.209 '0.258 0.209 0.209 0.2C9 0.338 0.338 0.338 0.349
2291 0.344 0.376 0.230 0.187 0.305 0.249 0.284 0.187 0.206 0.317 0.206 0.206 0.2C6 0.380 0.360 0.380 0.344
2295 0.471 0.514 0.315 0.243 0.417 0.341 0.369 0.243 0.282 0.413 0.282 0.282 0.282 0.520 0.520 0.520 0.471
2297 0.320 0.349 0.214 0.248 0.283 0.232 0.376 0.248 0.192 0.420 0.19? 0.192 0.1^2 0.353 0.353 0.353 0.320
2298 0.145 0.159 0.097 0.111 0.129 0.105 0.168 0.111 0.087 0.188 0.087 0.087 0.087 0.160 0.160 0.160 0.145
tn
0.456 0.373 0.225 0.159 0.325 0.232 0.241 0.159 0.231 0.269 0.231 0.231 0.231 0.353 0.353 0.353 0.456
24:- 0.35' 0.352 0.352 0.489 0.352 0.256 0.256 0.489 0.489 0.727 0.282 0.282 0.520 1.036 1.036 1.036 1.588
242 0.428 0.4?8 0.428 0.596 0.428 0.312 0.312 0.596 0.596 1.100 0.343 0.343 0.786 1.262 1.262 1.262 1.934
243 0.?54 0.254 0.254 0.4C5 0.254 0.232 0.232 0.405 0.405 0.399 0.165 0.165 0.286 0.938 0.938 0.938 1.086
243? 0.3?0 0.320 0.320 0.511 0.320 0.297 0.297 .0.511 0.511 0.504 0.203 0.208 0.360 1.200 1.2CO 1.200 1.371
26 6.955 3.445 6.405 5.093 2.571 7.560 13.253 4.796 5.223 10.755 R.45S 6.312 10.429 8.458 8.458 6.831 16.234
2611 22.6?5 ll.?07 20.837 16.569 8.363 24.592 43.132 15.604 16.990 34.987 27.516 '0.534 J3.926 27.516 27.516 22.222 52.813
?621 7.186 3.560 6.618 5.263 ?.656 7.811 13.700 4.956 5.397 11.113 8.740 6.522 10.776 8.740 8.740 7.058 16.775
2631 10.40? 5.15? 9.579 7.617 3. R45 11.306 19.829 7.174 7.S11 16.035 12.650 9.440 15.597 12.650 1?.650 10.216 24.280
?64 0.577 0.286 0.531 0.422 0.213 0.627 1.100 0.336 0.431 0.892 0.702 0.524 0.865 0. 7C2 0.7C2 0.567 1.347
-------
SIC
TABLE 1A
VJATFR USE PER EMPLOYEE (PILLION GALLONS PER YFAR) FOR EACH WATER USE REGION AND SIC CODE
*1* *2*
*4*
*6* *7*
REGION NUMBER
*8* *9* *10*
*12* *13* *14*
*16* *17*
2641 0.364 0.274 0.349 0.^63 0.186 0.590 0.885 0.197 0.253 0.855 0.604 0.502 0.829 0.604 0.6C4 0.543 1.291
2643 0.287 0.288 0.276 n.287 3.147 0.466 0.699 0.156 0.200 0.698 0.477 0.748 1.279 0.477 0.417 0.479 1.280
2646 0.944 0.468 O.P70 0.691 0.349 1.026 1.800 0.651 0.709 1.460 1.148 0.857 1.416 1.148 1.148 0.927 2.204
2647 0.704 0.349 0.648 0.515 0.260 0.765 1.342 0.485 0.529 1.088 0.856 0.639 1.055 0.856 0.856 0.691 1.643
2649 0.050 0.036 O.n48 0.050 0.026 0.079 0.122 0.027 0.035 0.112 0.083 0.066 0.109 0.083 0.083 0.071 0.170
265
r>.130 O.C89 0.125 0.130 0.066 0.196 0.316 0.071 0.090 0.278 0.216 0.163 0.270 0.216 0.216 0.177 0.420
Ot
tf»
to
2651 0.531 0.263 0.489 0.389 0.196 0.577 1.012 0.290 0.372 0.821 0.646 0.482 0.796 0.646 0.646 0.521 1.239
2654 0.058 0.045 0.056 0.058 0.030 0.094 0.142 0.032 0.040 0.140 0.097 0.082 0.135 0.097 O.OS7 0.089 0.211
2661 2.531 1.255 2.333 1.8^5 0.936 2.754 4.829 1.747 1.902 3.917 3.081 2.299 3.799 3.081 3.081 2.488 5.913
2«
2R1
2813
2815
0.634 0.602 1.087 1.629 0.819 1.653 3.515 2.859 2.389 6.169 1.068 4.425 16.595 3.500 3.SCO 2.577 3.406
1.n« 1.210 1.900 2.848 1.432 2.890 6.145 5.542 4.177 10.785 1.867 8.579 29.010 6.785 6.785 4.996 5.954
2312 0.341 0.371 "1.^82 0.873 C.439 0.886 1.884 2.078 1.280 3.306 0.57? 5.098 8.893 2.657 2.657 1.761 1.825
1.003 1.096 1.720 ?. 578 1.296 2.616 5.563 6.136 3.781 9.763 1.690 15.05526.262 7.847 7.847 5.201 5.390
0.440 0.461 0.754 1.131 0.569 1.147 2.440 1.861 1.658 4.282 0.741 2.881 11.517 2.279 2.279 1.678 2.364
2816 0.651 0.711
1.672 0.841 1.697 3.o08 3.549 2.452 6.333 1.096 5.494 17.034 4.345 4.345 3.199 3.496
281B 1.795 1.961 l.f'78 4.fl4 2.320 4.682 9.956 8.^34 6.766 17.472 3.024 12.901 46.999 10.204 10.2C4 7.513 9.645
7819 0.714 0.780 l.??5 1.835 0.921 1.863 3.799 2.662 2.692 6.951 1.2O3 4.122 18.6<57 3.260 3.260 2.4OO 3.837
-------
TABLE IA
WATER USE PER EMPLOYEE (MILLION GALLONS PER YEAR} FOR EACH WATER USE REGION AND SIC CODE
SIC
*3* *4*
*6*
REGION NUMBER
*8* *9* *10*
*12* *13* *14* *15* *16* * 1 7*
282
0.383 0.418 0.657 O.S85 0.495 0.999 1.987 1.392 1.444 3.728 0.645 2.156 10.029 1.705 1.7C5 1.255 2.058
2821 0.45? 0.494 0.775 1.162 0.584 1.179 1.934 1.355 1.704 4.400 0.762 2.098 11.837 1.660 1.660 1.222 2.429
2822 1.540 1.682 2.641 3.958 1.990 4.016 2.591 1.816 2.535 12.362 1.101 2.811 21.073 2.223 2.2i3 1.637 5.926
2823 0.448 0.490 0.769 1.152 0.579 1.169 2..4S7 2.001 1.690 4.364 0.755 3.097 11.738 2.450 2.450 1.804 2.409
2824 0.075 0.082 0.129 0.193 0.097 0.196 0.417 0.460 0.284 0.732 0.127 -1.129 1.970 0.589 0.589 0.390 0.404
283
tn
CO
2833
0.045 0.049 0.077 0.115 0.058 0.117 0.249 0.275 0.169 0.437 0.076 0.520 1.175 0.351 0.351 0.233 0.241
2831 0.038 0.042 0.06ft 0.099 0.050 0.100 0.106 0.075 0.104 0.374 0.045 0.116 0.866 0.091 0.051 0.067 0.206
0.118 0.128 0.202 0.302 0.152 0.307 0.652 0.719 0.443 1.144 0.198 1.764 3.078 0.920 0.920 0.610 0.632
2834 0.048 0.052 0.082 0.123 0.062 0.125 0.222 0.156 0.181 0.466 0.081 0.241 1.254 0.191 0.1S1 0.140 0.257
284
0.035 U.038 0.060 0.089 0.045 0.091 0.193 0.212 0.131 0.338 0.058 0.521 0.9C9 0.272 0.212 0.180 0.187
2841 0.041 0.044 0.070 0.104 0.053 0.106 0.225 0.249 0.153 0.396 0.068 0.610 1.064 0.318 0.318 0.211 0.218
2842 0.049 0.054 0.084 0.126 0.064 0.128 0.117 0.082 0.114 0.479 0.050 0.127 0.951 0.100 0.1CO 0.074 0.264
2843 0.074 0.081 0.127 0.190 0.096 0.193 0.410 0.452 0.279 0.720 0.125 1.110 1.936 0.578 0.578 0.383 0.397
2844 0.01? 0.013 0.020 0.030 0.015 0.030 0.041 0.029 0.040 0.114 0.017 0.044 0.306 0.035 0.025 0.026 0.063
2851 0.084 0.092 0.144 0.216 0.1C9 0.220 0.334 0.234 0.317 0.820 0.142 0.363 2.2C5 0.287 0.267 0.211 0.453
2861 0.250 0.273 0.429 0.643 0.323 0.652 1.387 1.529 0.942 2.433 0.421 2.900 6.546 1.956 1.956 1.296 1.343
287 1.699 1.856 2.913 4.365 2.195 4.430 3.987 2.795 3.902 16.531 1.694 4.326 32.430 3.422 3.422 2.519 9.120
-------
2*71
?89
28<>2
TABLE 1A
WATTR USE PER EMPLOYEE (MILLION GALLONS PER YEAR) FOR EACH WATER USE REGION AND SIC CODE
REGION. NUMBER
*2* *3* *4* *5* *6* *7* *8* *9* *10* *11* *12* *13* *14* *15* *16* *17*
a.??1! 2.4S5 1.901 5.847 2.941 5.934 5.221 3.659 5.109 22.143 2.218 5.665 42.465 4.481 4.481 3.299 11.942
0.189 0.4?5 0.667 1.000 3.503 1.014 2.157 1.690 1.466 3.786 0.655 2.617 10.184 2.070 2.070 1.524 2.090
2R91 0.784 0.857 1.344 2.015 1.013 2.045 1.691 1.185 1.655 7.631 0.718 1.835 13.752 1.451 1.451 1.068 3.867
0.239 0.316 0.496 0.743 0.374 0.754 1.604 1.769 1.090 2.815 0.487 3.109 7.572 2,
263 2.263 1.500 1.554
2899 0.271 0.296 0.464 0.695 0.350 0.706 1.501 1.063 1.020 2.634 0.456 1.646 7.084 1.302 1.3C2 0.958 1.454
?9
5.196 5.196 5.195 1.047 2.331 2.331 3.270 3.477 0.837 4.169 4.527 1.388 6.188 2.272 2.272 2.272 2.182
2911 5.393 5.393 5.393 1.0H7 2.419 2.419 3.393 3.609 0.869 4.327 4.698 1.471 6.422 2.358 2.358 2.358 2.313
01
795
0.796 0.796 0.796 0.160 0.357 0.357 0.501 0.532 0.128 0.638 0.467 0.141 0.948 0.348 0.348 0.348 0.222
2951 1.02? 1.022 1.02? 0.2O6 0.268 0.268 0.643 0.684 0.163 0.820 0.268 0.081 0.630 0.446 0.446 0.446 0.127
?952 0.771 0.771 0.771 0.155 0.346 0.3.46 0.485 0.516 0.124 0.619 0.486 0.147 0.919 0.337 0.337 0.337 0.231
799
0.244 0.744 0.744 0.049 0.109 0.109 0.153 0.163 0.039 0.196 0.182 0.055 0.290 0.107 0.1C7 0.107 O.OB7
?999 0.862 0.862 O.R62 0.174 0.201 0.201 0.542 0.577 0.123 0.692 0.201 0.061 0.472 0.334 0.334 0.334 0.095
30 0.13? 0.182 0.268 0.771 D.28? 0.283 0.062 0.389 0.291 0.040 0.108 0.108 0.062 0.108 0.1C8 0.111 0.1.32
•5011 0.147 0.202 0.297 0.245 0.314 0.314 0.068 0.431 0.323 0.044 0.120 0.120 0.068 0.120 0.120 0.123 0.147
3021 0.070 0.0?7 0.040 0.033 0.042 0.042 0.009 0.058 0.044 0.006 0.016 0.016 O.OC9 0.016 0.016 0.017 0.020
3069 0.096 0.131 0.194 0.160 0.205 0.205 0.045 0.281 0.211 0.029 0.078 0.078 0.045 0.078 0.078 0.080 0.096
•^079 0.17? 0.2^7 0.343 0.?88 0.280 0.280 0.080 0.507 0.380 0.052 0.141 0.141 0.080 0.141 0.141 0.145 0.172
-------
SIC
TABLE 1A
WATER USE PFR EMPLDYEF (PILLION GALLONS PER YFARI FOR EACH WATER USE REGION AND SIC CODE
*l*
RFGION NUMBER
*4* *5* *6* *7* *8* *9* *10*
*12* *13* *14* *15* *16* *17*
31 0.434 0.473 0.303 0.606 l.??6 1.226 1.226 0.606 1.226 1.226 1.226 1.226 1.226 1.333 1.333 1.333 1.226
3111 0.754 0.753 0.527 1.053 2.133 2.133 2.133 1.053 2.133 2.133 2.133 2.133 2.133 2.317 2.317 2.317 2.133
314 0.012 0.009 0.008 0.014 0.025 0.025 0.025 0.014 0.025 0.025 0.025 0.025 0.025 0.035 0.035 0.035 0.025
3141 0.012 0.009 O.OOR 0.014 0.025 0.025 0.025 0.014 0.025 0.025 0.025 0.025 0.025 0.035 0.035 0.035 0.025
32
0.174 0.740 0.461 0.384 0.371 0.424 0.820 0.615 0.388 0.741 0.526 0.345 0.5C9 0.167 1.333 1.038 1.684
3211 0.214 0.912 0.56S 0.473 0.458 0.523 1.532 0.759 .0.479 0.914 0.648 0.645 0.951 0.311 1.645 1.652 2.077
322
cn
*»
0.049 0.178 0.156 0.140 0.071 0.116 0.151 0.225 0.142 0.184 0.106 0.064 0.094 0.031 0.245 0.191 0.337
3221 0.020 0.087 O.C54 0.045 0.043 0.050 0.130 0.072 0.045 0.087 0.062 0.055 0.081 0.026 0.156 0.157 0.197
1229 0.057 0.207 0.131 0.244 n.083 0.135 0.176 0.385 0.328 0.214 0.124 0.074 0.1C9 0.036 0.266 0.222 0.393
3231 0.089 0.376 0.234 0.195 0.189 0.216 0.418 0.313 0.198 0.377 0.267 0.176 0.259 0.085 0.678 0.528 0.857
3241 0.291 1.237 0.771 0.641 0.6?0 0.709 2.960 1.029 0.649 1.239 0.879 1.154 1.528 0.464 2.229 2.239 2.816
325 0.018 0.078 0.049 0.041 0.039 0.045 0.146 0.065 0.041 0.078 0.056 0.061 O.OSO 0.029 0.141 0.142 0.178
3255 0.015 0.064 0.040 0.033 0.032 0..037 0.152 0.053 0.033 0.064 0.045 0.059 0.079 0.024 0.115 0.115 0.145
3?6 0.023 9.100 0.06? 0.0^2 0.049 0.057 0.103 0.0fl3 0.052 0.100 0.071 0.043 0.064 0.021 0.167 0.130 0.227
3261 0.027 0.113 0.070 0.059 0.057 0.065 0.235 0.094 0.059 0.113 0.080 0.099 C.140 0.042 0.2C4 0.205 0.257
3264 0.014 0.050 0.043 0.059 0.020 0.032 0.042 0.093 0.064 0.051 O.O3Q 0.018 0.026 O.)09 0.0fc9 0.053 0.094
327 0.304 1.106 0.928 0.772 0.441 0.719 0.940 1.239 0.78? 1.146 0.662 0.396 0.584 0.191 1.527 1.189 2.100
-------
Sir
3?9
tn
33
331
331?
3313
T-V.-3I.E It
f« IISF rcp r^F'LHYF1- (MLL1',;\ GALLONS °ER YC_A3) FOR EACH >«IATFH USE RFGIP.N AND SIC CODE
*?* * ?*
'-, ION MJ«i3E«
*10* *11* *12* *13* *14* <15*
*17*
327-} 1. n '> 7.09] £. MM ?.??" 1.1:^5 1.S19
3.b7. ?.7'5C- 3.08^ 1.74't 1.067 1.57} O.blS A. 117 3.204 5.661
0. ?3'» 1.901 -r).M=l 0.115 0.143 0 . 5'>P 0."55 0.827 0.5?? 0.1^5 0.671 0.401 0.5S2 D.194 1.549 1.206 2.131
0.32^ 0.1BH 0.3C7 0.401
0.4P9 n.?.R3 0.169 0.?49 0.082 0.652 0.508 0.897
O.?f,is '^.069 ).?6t>
O.jr.T 0.611 0.324 l.O'l 0.644 1.004 0.580 0.347 0.512 0.167 1.339 1.042 1.841
•1.2? 7 0.-!?6 0.7?" 0.634 O.^'U 0.537 0.702 1.017 0.642 O.H56 U.^94 0.296 0.436 0.143 1.141 0.888 1.569
3291 O.'">41 0.174 0.10° 0.090 0.037 0.100 0.271 0.145 0.09? 0.175 0.124 0.114 0.168 0.055 0.314 0.316 0.397
329? '1.131 0.475 0.415 O. 467 0.189 0.309 0.403 0.749 0.473 0.492
J.170 0.250 0.082 0.655 0.510 0.901
O."51 0.216 0.135 0.112 0.1 OH 0.124 0.230 O.lflO 0.114 0.217 0.154 0.097 0.143 0.047 0.374 0.291 0.492
3?T5 4.495 16.355 l?.^? 10.518 6.524 10.639 I 1.893 16.H72 10.650 If,.944 9.790 5.853 8.632 2.824 2?.5S2 17.580 31.064
'296 0.117 0.4?4 0.377 0.352 0.169 O.276 0.361 0.565 0.357 0.440 0.254 0.152 0.224 0.073 0.586 0.456 0.806
O.-.JO 1.490 1.30S 1.521 0.595 0.969 1.266 2.439 1.540 1.544 0.892 0.533 0.787 0.257 2.059 1.602 2.831
0.091 0.331 O.?90 0.390 0.13? 0.215 0.281 0.61.7 0.311 0.343 0.198 0.119 0.175 0.057 0.457 0.356 0.629
T.^25 0.720 1.090 2.643 l.6«l 1.20? 1.654 3.2?5 1.349 1.664 ?.08l 1.876 4.337 1.771 2.568 0.378 3.423
1.101 0.96? 1.456 3.533 2.24" 1.706 ?.21l 4.311 1.804 2.211 2.782 2.508 5.797 2.514 3.645 0.536 4.575
1.703 1.050 1.58° 3.P56 2.453 1.708 2.412 4.704 1.969 2.412 3.036 2.737 6.326 2.516 3.648 0.537 4.993
0.^63 0.055 O.CH3 O.?02 0.129 0.155 0.127 0.247 0.1C3 0.127 0.159 0.144 0.33? 0.653 0.724 0.220 0.262
1 ^95 0.160 0.243 0.589 0.374 0.120 0.2I2 0.718 0.301 0.212 O.251 0.262 0.845 0.I 76 0.255 0.038 0.356
-------
SIC
3316
TABLE 1A
WATFR USF PFP EMPLOYEE (MILLION GALLONS PER YEAR) FOR EACH WATER USE REGION AND SIC CODE
RFGION NUMBER
*4* #5* *6* *7* *8* *9* *10* *ll* *12* *13* *14* *15
*16* *17*
0.132 n.120 0.18? 0.441 O.?80 0.165 0.276 0.538 0.225 0.276 0.347 0.313 0.723 0.244 0.353 0.052 0.493
Of
3317 0.124 0.274 0.415 0.835 0.64O 0.156 0.276 0.962 0.450 0.276 0.326 0.341 1.100 0.229 0.333 0.049 0.464
332 0.063 0.065 n.099 0.240 0.152 0.085 0.150 0.292 0.122 0.150 0.179 0.170 0.3S3 0.126 0.162 0.027 0.254
3321 0.084 n.OSft 0.133 0.?23 0.205 0.1C5 0.185 0.394 0.165 0.185 0.219 0.229 0.530 0.154 0.224 0.033 0.312
3322 0.041 0.036 0.054 0.132 0.084 0.093 0.082 0.161 0.067 0.082 0.104 0.094 0.216 0.136 0.1S8 0.029 0.171
3323 0.031 0.027 0.041 0.100 0.063 0.043 0.062 0.122 0.051 0.062 0.079 0.071 0.164 0.064 O.OS3 0.014 0.129
333 1.543 1.346 2.037 4.942 3.144 2.CC8 3.092 6.029 2.523 3.092 3.891 3.508 8.108 2.958 4.289 0.631 5.983
3331 0.710 2.672 4.202 4.773 3.954 0.890 1.576 5.499 2.571 1.576 1.864 1.949 6.288 1.311 1.9CO 0.280 2.651
3332 0.680 2.184 3.306 4.573 3.788 0.852 1.510 5.268 2.463 1.510 1.786 1.867 6.023 1.256 1.821 0.268 2.540
3333 0.362 0.316 0.478 1.160 0.738 0.889 0.726 1.415 0.592 0.726 0.913 0.823 1.903 2.038 2.955 0.435 1.502
3334 0.9fll 0.856 1.295 3.143 1.999 1.940 1.966 3.834 1.605 1.966 2.475 2.231 5.157 2.857 4.143 0.610 4.070
3339 2.841 2.479 3.752 9.102 5.790 6.179 5.695 11.105 4.647 5.695 7.167 6.462 14.934 9.101 13.1S6 1.942 11.787
3341 0.076 0.197 0.298 0.512 0.424 O.C95 0.169 0.590 0.276 0.169 0.200 0.209 0.674 0.141 0.2C4 0.030 0.284
335 0.133 0.789 0.438 0.894 0.676 0.167 0.295 1.030 0.482 0.295 0.349 0.365 1.178 0.246 0.356 0.052 0.497
3351 0.218 0.359 0.544 1.319 0.839 0.273 0.483 1.609 0.673 0.483 0.572 0.598 1.928 0.402 0.5E3 0.086 0.813
3352 0.128 0.353 0.534 0.859 0.712 0.160 0.284 0.990 0.463 0.284 0.336 0.351 1.132 0.236 0.342 0.050 0.477
3356 0.108 0.094 0.142 0.345 0.220 0.148 0.216 0.421 0.176 0.216 0.272 0.245 0.567 0.218 0.316 0.046 0.441
-------
TABLE 1A
WATTR USF PER F"PLOYEE (MLLMN GALLONS P^R YEAR) FiJP EACH WATER USE REGION AND SIC COOP
-4*
*6* *7*
RFC, ION NUMBER
*8* *9* *10*
*12* *13* * 1 4*
*16* *17*
3T57 0.171 1.171 0.261 0.488 O.401 0.091 0.161 O.bo2 0.263 0.16] 0.191 0.199 0.643 0.134 0.1S4 0.029 0.271
136 0.17'-) O.?01 0.304 0. 5?9 0.43P O.C99 0.175 0.6H4 0,?85 0.175 0.206 0.216 0.6S6 0.145 0.210 0.031 0.294
0.757 0.3R9 0.742 O.f-0" 0.138 O.245 0.8b5 0.400 0.245 0.290 0.303 0.978 0.204 0.2<6 0.044 0.412
•1.T47 0.071 0.173 0.110 0.061 0.107 9.211 0.088 0.107 0.127 0.123 0.284 0.089 0.1 29 0.019 0.181
3369 1."T5 ".13? 0.??4 0.236 0.196 0.044 0.07H 0.272 0.127 0.078 O.r,9? 0.096 0.311 0.065 O.CS4 0.014 0.131
3->o
3391
cn
tf»
CO
339? 0.047
0.079 0.119 0.2*9 0.184 O.C78 0.13S 0.353 0.14t 0.13^ 0.163 0.171 0.475 0.115 O.ltb 0.024 0.232
0.014 0.051 0.1?4 O.O7^ 0.060 0.070 0.152 0.063 0.079 0.093 0.088 0.2G4 0.088 0.128 0.019 0.161
T.13f 0.205 0.315 O.?61 0.059 0.104 0.363 0.170 0.104 0.123 0.129 0.415 0.086 0.125 0.018 0.175
3399 0.183 0.?33
0.857 0.545 0 . ?29 0.406 1.045 0.437 0.406 0.480 0.502 1.406 0.337 0.469 0.072 0.682
^ 1.180 0.08? 0.144 0.139 0.206 O.IC3 0.242 0.136 0.217 0.264 0.096 0.096 0.081 0.096 O.OS6 0.113 0.189
3411 0.'M7 0.01^ O.ooo O.r?3 O.C19 1.007 0.015 0.0??. 0.017 0.017 P.006 0.006 0.005 0.006 O.OC6 0.007 0.012
342
0.171 0.074 n.
O.
0.?74 0.1C3 O.^fH 0.189 0.248 0.238 0.087 0.087 0.073 0.087 0.067 0.102 0.170
0.096 ".042 0."73 0.1H6 0.155 O.C58 0.123 0.180 0.141 0.134 0.049 0.049 0.041 0.049 0.019 0.058 0.096
n.i«4 n.1-57 p.r>A4 1.113 H.156 O.C51 0.108 0.110 0.123 0.118 0.043 0.043 0.036 0.043 0.043 0.050 0.084
O.'V-', 0.0?" P.04=> 0.124 1.113 0.03" 0.08? 0.120 0.094 0.0^0 0.033 1.033 0.028 0.033 0.033 0.038 0.064
0.730 0.100 0.175 0.144 0.214 0.106 0.290 J.141 0.225 0.3?1 0.117 0.117 O.O^fl 0.
117 0.117 0.134 0.230
343
1.1R4 0.080 0.140 0.166 0.747 0.111 0.236 0.1^3 0.259 0.?57 O.O93 0.093 0.079 0.093 0.0=3 0.HO 0.184
-------
SIC
TABLE 1A
WATER USE PFR FMPLOYEE (MILLION GALLONS PER YEAR) FC)R EACH WATFR US6 REGION AND SIC CODE
*1* *2* *3* *4*
*6* *7*
REGION NUMBER
*9* *10*
*12* *13*
*16* * L 7*
tn
*?
CO
3431 0.309 0.134 0.?35 0.233 0.345 0.172 0.396 0.228 0.363 0.431 0.157 0.157 0.132 0.157 0.157 0.184 0.309
3432 r\.l?f> 0.065 0.096 0. 113 0.168 0.076 0.161 0.111 O.l7t> 0.176 0.064 0.064 0.054 0.064 0.0fc4 0.075 0.126
3433 0.107 0.046 O.oo? 0.142 O.172 0.065 0.137 0.139 0.156 0.150 0.054 0.054 0.046 0.054 0.054 0.064 0.107
344 0.050 0.02? 0."38 0.096 0.031 0.030 0.064 0.094 O.O73 0.070 0.026 0.026 0.021 0.026 0.026 0.030 0.050
3441 0.011 0.005 0.008 0.021 0.017 0.006 0.014 0.020 0.016 0.015 0.005 0.005 0.005 0.005 O.OC5 0.006 0.011
344? O.?31 0.10Q 0.176 0.148 0.220 0.1C9 0.29o 0.145 0.231 0.322 0.117 0.117 0.099 0.117 0.117 0.138 0.231
344? 0.035 0.015 O.H27 0.068 o.056 O.C21 0.045 0.065 0.051 0.049 0.018 0.013 0.015 0.018 0.018 0.021 0.035
3444 0.17' 0.031 0.054 0.111 0.115 0.043 0.092 0.109 0.104 0.100 0.036 0.036 0.031 0.036 0.0 3b 0.043 0.072
345 0.1?6 0.054 0.095 0.128 0.190 0.076 0.161 0.125 0.18? 0.175 0.064 0.064 0.054 0.064 0.064 0.075 0.126
3461 0.283 0.083 0.159 0.099 0.147 0.073 0.199 0.097 0.154 0.264 O.095 0.095 O.O6B 0.095 0.095 0.092 0.283
347
0.763 0.330 O.SRI 0.774 1.149 0.460 0.978 0.759 1.113 1.065 0.3R^ O.38R 0.326 0.388 0.368 0.456 0.763
3471 0.810 0.35^ O.M6 O.RO8 1.199 0.488 1.037 0.792 1.181 1.130 0.411 0.411 0.346 0.411 0.411 0.484 O.dlO
3479 1.405 0.175 0.30" i">.510 0.651 0 . Z44 n. ;-, 19 0.4 ?9 0.591 0.565 0.206 0.206 0.173 0.206 0.2C6 0.242 0.405
0.114 '1.049 0.085 0.151 0.1 "53 0.069 0.146 (1.14rt 0.166 0.159 0.058 0.058 0.04^ 0.058 0.058 0.068 0.114
1.P9H 0.043 0.075 0.125 l.l^0 O.C59 0.126 0.122 0.143 0.137 O.C50 0.050 0.042 0.050 0.050 0.059 0.098
n.l]7 0.050 0.080 0.225 0.1 an n.c70 0. 14'1 0.217 0.171 O.lf>3 0.059 0.059 0.050 0.059 0.059 0.070 0.117
0.067 0.02Q 0.051 0.130 0.10:? 0.041 0.586 0.125 0.19H 0.094 ^.134 0.034 0.029 0.034 0.03^ 0.040 0.067
349
-------
sir
351
en
CT:
o
3 V<
^537
WATFR USE PER
TABLE 1A
(PILLION GALLll.MS PFR YEAR) FOP EACH WATER USE REGION AND SIC CODE
*1
*?* *3*
REGION NUMBER
*8* *4* *10*
*12* *13*
*15* *16* *17*
3404 0. ""•)<-, 0.0?4 0.04? 0.100 0.08R 0.033 0.070 0.048 0.080 0.076 0.028 0.028 0.023 0.028 0.028 0.033 0.055
3497 0.74'' 0.1.15 0.18'. O.?7fi 0.390 0.146 0.311 0.272 0.354 0.338 0.123 0.123 0.1C4 0.123 0.123 0.145 0.242
3408 0.05ft O.o?4 0.04? 0.1"8 O.O^o 0.034 0.072 0.105 0.082 0.078 0.023 0.028 0.024 0.028 0.028 0.034 0.056
34CK> 0.127 0.055 0.097 0.118 0.174 0.077 0.163 0.115 0.183 0.178 0.065 0.065 0.054 0.065 0.065 0.076 0.127
35 O.n?n 0.0?* O.C76 O.OH2 0.124 0. 1C8 0.113 0.081 0.096 0.158 O.026 0.086 0.167 0.026 0.026 0.055 0.030
0.023 0.02A 0.109 0.077 0.117 0.102 0.433 0.077 0.091 0.320 0.025 0.108 0.639 0.025 0.025 0.087 0.028
3511 0.104 0.004 0.015 0.011 0.016 0.01 0.2C8 0.089 0.147 O.?l9 0.124 0.030 0.068 0.131 0.030 0.030 0.044 0.074
0.04! 0.040 0.133 0.117 0.177 0.154 0.198 0.116 0.137 0.277 0.038 0.150 0.292 0.038 0.038 0.097 0.043
0.07? 0.066 O.C50 0.070 0.104 0.173 0.074 0.12?. 0.132 0.104 0.025 0.056 0.109 0.025 0.025 0.036 0.072
35T1 0.~4S 0.044 0.057 0.081 0.120 0.17? 0.085 0.130 0.153 0.119 0.029 0.064 0.125 0.029 0.029 0.042 0.048
n.010 0.009 0.025 0.0?7 0.042 O.C36 0.037 0.0?7 0.032 0.051 0.009 0.028 0.054 O.OC9 O.OC9 0.018 0.010
1.700 0.35^ C.04? 0. OSQ 0.088 0.146 0.063 0.103 0.154 0.088 0.021 0.048 0.0<;2 0.021 0.021 0.031 0.209
0.141 0.130 0.1')? 0.145 0.215 0.356 O.153 0.252 0.375 0.213 0.052 0.116 0.225 0.052 0.052 0.075 0.141
1.^15 0.014 o.oll O.oiS 0.022 0.037 0.016 0.026 0.03^ 0.022 0.005 0.012 0.023 0.005 O.OC5 0.008 0.015
O.'M? 0.015 0.^23 0.03? 0.04.1 0.060 O.034 0.045 0.053 0.047 O.ol? 0.026 0.050 0.012 0.012 0.017 0.017
3S41 o.oil 0.110
0.030 0.045 O.C40 0.034 0.03O 0.035 0.048 0.010 0.026 0.051 0.010 0.010 0.017 0.011
-------
SIC
3544
TAULF 1A
WATER U3 0.074 0.065 0.016 0.035 0.069 0.016 0.016 0.023 0.023
3552 0.038 0.035 0.065 0.092 0.136 0.137 0.097 0.104 0.122 0.135 0.033 0.073 0.143 0.033 0.033 0.047 0.038
1553 O.o?5 0.023 0.040 0.057 0.085 0.089 0.060 0.067 0.079 0.084 0.020 0.046 0.089 0.020 0.020 0.029 0.025
3559
£1356
0.01? 0.011 0.019 0.027 0.040 0.042 0.029 0.032 0.037 0.040 0.010 0.022 0.042 0.010 0.010 0.014 0.012
0.02« 0.027 0.030 0.043 0.064 O.K4 0.045 0.075 0.092 0.063 0.015 0.034 0.067 0.015 0.015 0.022 0.029
3561 0.016 0.015 0.02? 0.031 0.046 0.059 0.033 0.044 0.052 0.046 0.011 0.025 0.049 0.011 0.011 0.016 0.016
ft
3562 1.03? 0.0?9 0.032 0.045 0.067 0.111 0.047 0.078 O.IC1 0.066 0.016 0.036 0.070 0.016 0.016 0.023 0.032
3566 0.021 0.020 0.037 0.052 0.077 O.C7R 0.054 0.059 0.069 0.076 0.019 0.041" 0.080 0.019 0.019 0.027 0.021
3569 0.169 0.156 0.098 0.13« 0. ?06 0.342 0.146 U.241 0.360 0.204 0.050 0.111 0.216 0.050 0.050 0.072 0.169
357
0.013 "1.017 0.037 0.050 0.075 O.C66 0.054 0.049 0.058 0.076 0.016 0.041 0.060 0.016 0.016 0.027 0.018
357? 0.027 0.025 0.027 0.038 0.1-56 O.OS3 0.040 0.066 0.087 0.055 0.014 0.030 0.059 0.014 0.014 0.019 0.027
3573 0.012 0.011 0.047 0.033 0.050 0.044 O.T71 0.033 0.039 0.099 0.011 0.046 0.1C4 0.011 0.011 0.035 0.012
3574 0.005 0.005 0.014 0.015 0.023 0.020 0.021 0.015 0.017 0.029 0.005 0.016 0.031 0.005 O.OC5 0.010 0.005
358 0.041 0.038 0.03O 0.042 0.063 0.1C5 0.045 0.074 0.110 0.063 0.015 0.034 0.066 0.015 0.015 0.022 0.041
-------
sir
WATTR USE PFR FMPI
*?* *4* *')*
TAULE 1A
(MILLION GALLONS PER YFAR) FDR EACH WATE9 USE RFG10N AND SIC CODE
*7*
REGION NUMBER
*H* * ?* *10*
*12* *13*
*15* *16* *17*
3581 O.OM 0.03fl 0.017 0.024 O.036 O.C60 0.126 0.042 0.063 0.036 0.009 0.019 0.038 0.009 O.OC9 0.012 0.041
-*5Rr-> O.o^f, 0.143 0.033 0.046 0.069 0.114 0.049 0.081 0.120 0.068 0.017 0.037 0.072 0.017 0.017 0.024 0.046
3586 0.0)9 O.ooo 0.020 0.025 0.038 0.033 0.030 0.025 0.030 0.042 0.008 0.023 0.044 0.008 O.OC8 0.015 0.009
350Q O.or,7 o.r^7 n.nvi 0. 0^5 0.081 0.135 Q.05H 0.095 0.142 0.081 0.020 0.044 0.085 0.020 0.020 0.028 0.062
?'' 0.1*1 0.06Q O.r-96 0.119 0.158 0.083 0.117 O.OP'j 0.062 0.040 0.064 0.111 0.117 0.064 0.064 0.040 0.101
361
0. ."15+ T.037 0.051 0.078 0.085 0.076 0.114 0.075 0.133 0.021 0.062 0.072 0.114 0.062 0.062 0.040 0.054
cn
3611 0.06-> 0.04? 0.059 0.066 2.089 0.047 0.066 0.048 O.T38 0.024 0.036 0.062 0.066 0.036 0.036 0.023 0.062
0.07H 0.01" 0.027 0.041 0.044 0.C40 0.170 0.039 0.017 0.011 0.080 0.038 0.070 0.080 0.080 0.030 0.028
3613 o.06i 0.043 O.C60 0.091 T.T94 O.Q8R 0.128 0.067 0.038 0.025 0.070 0.084 0.128 0.070 0.070 0.044 0.063
36?
0.069 0.047 0.066 0.1OO 0.109 O.CS7 0.172 0.09b 0.042 0.027 0.096 0.092 0.172 0.096 O.OS6 0.061 0.069
36?1 0.05? O.?3f. 0.04" 0.075 0. o^l 0.073 0.129 0.072 0.032 0.020 0.105 0.069 0.1,29 0.105 0 . 1 C5 0.055 0.052
36?2 O.n^-) 0.077 0.037 0.057 0.061 0.055 0.091 0.054 0.024 0.015 0.049 0.052 O.OS1 0.049 0.049 0.031 0.039
36^3 o.ooo 0.036 0.1?1 0.070 0.093 0.049 0.069 0.050 0.056 0.047 0.038 0.066 0.069 0.038 0.038 0.024 0.090
3674 0.'64 0.1TO O.?51 0.335 0.415 0.235 0.330 0.241 0.161 0.104 0.180 0.313 0.330 0.180 0.180 0.114 0.264
"»6?9 0.074 0.051 O.f7-) 0.107 0.116 0.104 0.185 0.103 O.045 0.029 0.146 0.099 0.185 0.146 0.146 0.079 0.074
363 0.031 0.021 0.079 0.045 0.049 0.C44 0.077 0.043 0.019 0.012 0.118 0.041 0.077 0.118 0.118 0.033 0.031
3631 o.T6-> 0.04? O.C59 0.0"5 0.097 0.060 0.084 0.061 0.038 0.024 0.046 0.08,0 0.084 0.046 0.046 0.029 0.062
-------
TABLK 1A
•W4TCR USF PER FMPLOYFE (PILLION GALLONS PER YFAK) FOR EACH WATEK USE REGION AND SIC CODE
PEG ION NUMBER
SIC *1* *2* *3* *4* *5* *6* *7* *8* *9* *10* #11* *12* *13* *14* *15* *16* *17*
363? 0.251 0.17? 0.239 0.3C5 0.395 0.214 0.301 0.219 0.153 0.099 0.164 0.285 0.3C1 0.164 0 .114 0.104 0.251
3633 0.111 0.076 0.105 0.161 0.174 0.117 0.165 0.120 0.068 0.044 0.090 0.148 0.165 0.090 0.CSO 0.057 0.111
3634 0.138 0.094 0.131 0.192 0.217 0.135 0.190 0.138 0.084 0.055 0.103 0.180 0.1SO 0.1C3 0.1C3 0.065 0.138
3639 0.076 0.052 O.07? 0.110 D.119 O.C98 0.138 0.101 0.046 0.030 0.075 0.101 0.138 0.075 0.075 0.048 0.076
364 O.OR? 0.056 0.078 0.120 3.129 0.085 0.120 O.OH7 0.050 0.032 0.065 0.110 0.120 0.065 0.0£5 0.041 0.082
3641 0.017 0.011 0.016 0.024 0.026 0.024 0.042 0.023 0.010 0.007 0.043 0.022 0.042 0.043 0.043 0.018 0.017
3642 0.165 0.113 0.157 0.151 0.201 0.106 0.149 0.109 0.101 0.065 0.081 0.141 0.149 0.081 0.061 0.051 0.165
3643 0.051 0.035 0.04H 0.074 0.080 0.071 0.103 0.070 0.131 0.020 0.056 0.068 0.103 0.056 0.056 0.036 0.051
3644 0.104 0.071 0.099 0.152 0.164 0.139 0.196 0.143 0.064 0.041 0.107 0.140 0.1S6 0.107 0.1C7 0.068 0.104
365 0.038 0.026 0.036 0.047 0.059 0.033 0.047 0.034 0.023 0.015 0.026 0.044 0.047 0.026 0.026 0.016 0.038
3651 0.076 0.017 0.024 0.034 0.040 O.C24 0.033 0.024 0.016 0.010 0.018 0.032 0.033 0.018 0.018 0.012 0.026
3652 0.136 0.093 0.129 0.156 0.207 0.109 0.153 0.112 0.083 0.054 0.084 0.146 0.153 0.084 0.064 0.053 0.136
366 0.059 0.040 0.056 0.065 0.087 0.046 0.064 0.047 0.036 0.023 0.035 0.061 0.064 0.035 0.035 0.022 0.059
367 0.138 0.096 0.134 0.108 0.144 0.076 0.106 0.077 0.085 0.056 0.058 0.101 0.106 0.058 0.058 0.037 0.138
3671 0.068 0.047 O.P66 0.053 0.070 0.037 0.052 0.038 0.042 0.027 0.028 0.049 0.052 0.028 0.028 0.018 0.068
3672 0.10? 0.070 0.097 0.127 0.161 0.089 0.125 0.091 0.063 0.040 0.068 0.119 0.125 0.068 0.068 0.043 0.102
3673 0.084 0.057 O.P80 0.122 0.132 0.099 0.140 0.102 0.051 0.033 0.076 0.113 0.140 0.076 0.076 0.048 0.084
-------
TABLE 1A
WATER USE PER EMPtQYEF (PILLION GALLONS PER YEAR) FOR EACH WATER USE REGION AND SIC CODE
KFGlflM NUMBER
SIC *1* *?* *3* *4* *5* *6* *7* *8* *9* *10* *H* *12* *13* *14* *15* *16* * 17*
3674 0.130 0.125 0.174 0.101 0.135 0.071 0.100 0.073 0.080 0.068 0.054 0.095 0.100 0.054 0.054 0.034 0.130
3679 0.114 0.078 0.10R 0.117 0.157 0.082 0.116 0.084 0.070 0.045 0.063 0.110 0.116 0.063 0.063 0.040 0.114
369
0.106 0.072 0.101 0.154 0.166 0.149 0.259 0.147 0.065 0.042 0.141 0.142 0.259 0.141 0.141 0.089 0.106
3691 0.283 0.193 0.268 0.287 0.332 0.201 0.283 0.206 0.173 0.112 0.154 0.268 0.283 0.154 0.154 0.098 0.283
3692 0.033 0.023 0.031 0.048 n.052 0.047 0.083 0.046 0.020 0.013 0.048 0.044 0.083 0.048 0.048 0.030 0.033
3694 0.055 0.038 0.05^ 0.080 0.087 O.C78 0.124 0.077 0.034 0.022 0.068 0.074 0.124 0.068 0.068 0.043 0.055
37
CJ1
01 371
O.r>43 0.097 0.076 0.238 0.102 0.095 0.086 0.145 0.085 0.086 0.031 0.031 0.070 0.031 0.031 0.047 0.119
0.105 0.106 0.185 0.398 0.112 0.225 0.095 0.159 0.093 0.095 0.034 0.034 0.171 0.034 0.024 0.052 0.233
3711 0.701 0.054 0.139 0.203 0.057 0.115 0.048 0.081 0.047 0.048 0.017 0.017 0.128 0.017 0.017 0.027 0.119
3714 0.043 0.1^7 0.075 0.236 0.132 0.094 0.140 0.236 0.138 0.140 0.040 0.040 0.070 0.040 0.040 0.077 0.118
372 0.015 0.075 0.027 0.OP4 0.047 0.034 0.083 0.101 0.082 0.083 0.014 0.014 0.025 0.014 0.014 0.046 0.042
3722 0.019 0.092 O.O33 0.1^3 0.058 0.041 0.144 0.124 0.197 0.144 0.018 0.018 0.031 0.018 O.C18 0.083 0.052
3729 0.048 0.041 0.^85 0.155 0.044 0.088 0.037 0.062 0.036 0.037 0.013 0.013 0.079 0.013 0.013 0.020 0.091
373 0.006 0.030 0.011 0.034 0.019 0.014 0.047 0.041 0.065 0.047 0.006 0.006 0.010 0.006 O.OC6 0.027 0.017
3731 0.006 0.030 0.011 0.034 0.019 0.014 0.047 0.041 0.065 0.047 0.006 0.006 0.010 0.006 O.OC6 0.027 0.017
374 0.016 0.063 0.029 0.091 0.051 O.C36 0.056 0.095 0.055 0.056 0.016 0.016 0.027 0.016 0.016 0.031 0.046
-------
PROJECTION INDICES: OUTPUT AND WATER PRODUCTIVITY
555
-------
Projection Indices: Output and Water Productivity
This table shows the relationship between annual rates of physical
production and water intake, from which the water productivity indices
(unit intake multipliers) are derived. An index number below 1.0 shows
efficient water use by that industry (water intake per unit output is
declining).
Production Index (Output): a measure of change in physical produc-
tion (or, failing data, of sales or value added, adjusted for price
level shifts) between 1959 and 1968.
Water Intake; a measure of change in physical volume of water intake
between 1959 and 1968.
Water Productivity Index (Unit Intake Multiplier): developed from
annual percent change in output and water intake; e.g. for SIC 201,
3.4 - 2.6 = 0.8; 1.000 less .008 = .992 (index number).
For projecting future waste treatment needs, the assumption was made that
output of goods and intake of water would sustain the relationships that
existed over the period 1959-1968. Thus, the derived annual output and
unit intake multipliers were applied to the hypothesized capital require-
ments for each year of the period of the projection for each industrial
category.
556
-------
SIC Industry Name and Production
Measure Used (inol. source)
PROJECTION INDICES: OUTPUT AND WATER
PRODUCTIVITY
1959-1968
PRODUCTION
Index or Physical
Quantities
1959 or 1961; 1968
ANNUAL PERCENT CHANGE
Output Water Intake^
OUTPUT
MULTIPLIER
UNIT INTAKE
MULTIPLIER
en
en
201 Meat Products - Bus. Stat. ,J Total 21*272
Meats - minion Ibs. 1959, 68
202 Dairy Products - Bus. Stat., 12881*9
Production of Creamery Butter, Cheese,
Condensed and Evaporated Milk, Fluid
Milk, Dry Milk - million Ibs., 1959, 68
203 Canned and Preserved Fruits, Vegetables, 8128601
and Sea Foods - Agricultural Statistics^-
Add Canned (per capita consumption x U.S.
Population) and Frozen (total as given) in
(ooo)'s Ibs. - tables 291, 2 in 19685
tables 292, 3 in 1970 - 1959, 68
201*1-5 Grain Min Products - Bus. Stat., 261663
Wheat Flour - thousands of 100 Ib.
sacks, 1961*, 68
201*6 Wet Corn Milling - Assume Production
characteristics same as in 203 above
205 Bakery Products - Bus. Stat., - deflate
confectionery manufacturers' sales by
WPI for Cereal and Bakery Products
(mill, dollars), 1959, 68
207 Confectionery and Related Products -
Assume Production Characteristics same
as in 205 above
2061-2 Cane Sugar, Agri. Stat., (ooo)'s raw ^
tons, Continental U.S. - (table 123,
1970) 1959, 68
2063 Beet Sugar, Agri. Stat., (ooo)'s tons, 23l;0
Continental U.S. - (table 123, 1970)
1959, 68
32717
123531*
11*250612
251*185
1137.5 11*1*2.5
1209
31*67
3.1*
-0.5
6.1;
-0.7
6.1;
2.7
2.7
7.8
1*.5
2.6
k.k
3.5
6.6
-2.1;
-0.6
3.2
-0.7
1.031*
.995
1.061;
.993
1.061*
1.027
1.027
1.078
1.01*5
.992
1.01*9
.971
1.073
.977
.91*9
.967
.951;
.91*8
-------
01
en
03
Industry Name and Production
Measure Used (incl. source)
208 Beverages - Federal Reserve Index,
Beverages, 1959,68
209 Miscellaneous Food Preparations and
Kindred Products - Bus. Stat.,
Millions Ibs. coconut oil, corn oil,
cottonseed oil, linseed oil, soybean
oil (total all categories), 196J4, 68
2211 Broad Woven Fabric Mills, Cotton -
Bus. Stat., Millions of lin. yds.
of cotton cloth production, 1959, 68
2221 Broad Woven Fabric Mills, Man-made
fiber and silk - Bus. Stat., Millions
of linear yards of man-made fiber and
silk fabrics production, 1959, 68
2231 Broad Woven Fabric Mills, Wool: In-
cluding Hying and Finishing - Bus.
Stat., Millions of linear yards of
woolen and worsted woven goods pro-
duction, 1959, 68
22XX Other Textiles - Federal Reserve,
excl(2211,21,3l) Tesctile Mill products, 1959, 68
2UOO Lumber and Wood Products - Federal
Reserve, Lumber and products, 1959,
2611 Pulp Mills - Bus. Stat., Woodpulp
Production, (ooo)'s of short tons,
1959, 68
2621 Paper Mills - Bus. Stat., Paper and
Board Production, (ooo)'s of short
tons, 1959, 68
PRODUCTION
Index or Physical
Quantities
1959 or 196)4 1968
103.2
8063
9603
2500
310.8
3^015
156.5
8hl7
5280
21+3-3
h9hkh
ANNUAL PERCENT CHANGE
2
Output Water Intake
li.7 2.0
1.1
-2.8
-2.7
IN 2
O.h
-2.5
7.1
0.7
1.0
OUTPUT
MULTIPLIER
1.01*7
1.011
.972
1.087
.973
1.0U2
UNIT INTAKE
MULTIPLIER
.973
.993
1.003
.98U
1.03lt
109.0
108.3
21*383
151.5
122.3
37903
3.7
1.1;
5.0
6.7
-1.9
0.2
1.037
l.Olli
1.050
1.030
.967
.952
.968
-------
Industry Name and Production
Measure Used (incl. source)
PRODUCTION
Index or Physical
Quantities1
1959 or 196)4 1968
ANNUAL PERCENT CHANGE
Output
Water Intake'
OUTPUT
MULTIPLIER
UNIT INTAKE
MULTIPLIER
2631 Paperboard Mills - Bus. Stat.,
Paperboard production, (ooo)'s
of short tons (weekly avg.),
1959,68
261* Converted Paper and Paperboard
Products - Bus. Stat., Fine paper
Printing Paper and Coarse Paper,
combined total production, (ooo)'s
short tons, 19614,68
265 Paperboard Containers and Boxes -
Bus. Stat., Shipping Containers,
million sq. ft. surface, 1961(, 68
266 Building Paper and Building Board
Mills - Bus. Stat.- Construction
Paper and Board Production, (ooo)'s
short tons, 1959, 68
CJ1 2812 Alkalies and Chlorine - Bus. Stat.,
CJ» Inorganic Chemicals" 1959. 68
tO
2813 Industrial Gases - Bus. Stat.,
Inorganic Chemicals" 1959» 68
2815 Cyclic Intermediates, Dyes, Organic
Pigments, and Cyclic Crudes - Bus.
Stat., Organic Chemicals', 1959, 68
28l6 Inorganic Pigments - Bus. Stat.,
Inorganic Chemicals6, 1959, 68
30?
12219
' 137261
11*590
173831*
5.1
1..5
6.1
1*.7
k.5
1*.7
1.051
1.01*5
1.061
.996
1,000
.986
331*0
100.0
100.0
100.0
100.0
1^358
192.2
192.2
l6U.lt
192.2
3.0
7.5
7.5
5.7
7.5
-14.3
-3.2
2.98
0.1*
2.98
1.030
1.075
1.075
1.057
1.075
.927
.893
.951*
.91*7
.9514
-------
Industry Name and Production
Measure Used (incl. source)
2818 Industrial Organic Chemicals -
Bus. Stat.j Organic Chemicals?.
1959, 68
2819 Industrial Inorganic Chemicals -
Bus. Stat.j Inorganic Chemicals"
1959, 68
282 Plastic Materials and Synthetic
Resins, Synthetic Rubber, Synthetic
and Other Man-Made Fibers, Except
Glass - Bus. Stat., (ooo)'s Ibs.
Plastics and Resin Materials
Production, 1959, 68
283 Drugs - Federal Reserve, Drugs, soap
and toiletries, 1959, 68
tn
OT
O
281; Soap, Detergents, and Cleaning
Preparations, Perfumes, Cosmetics,
and Other Toilet Preparations -
Federal Reserve, Drugs, soap and
toiletries, 1959, 68
2851 Paints, Varnishes, Lacquers, Enamels
and Allied Products - Bus. Stat.,
deflate mill, of dollars factory
shipments paints, varnish and lacquer
by WPI for prepared paint
2861 Gum and Wood Chemicals - Bus. Stat.,
Organic Chemicals?, 1959, 68
28? Agricultural Chemicals - Federal
Reserve, Chemicals and Products,
1961;, 68
PRODUCTION
Index or Physical
Quantities 1
1959 or 196U 1968
ANNUAL PERCMT CHANGE
OUTPUT
MULTIPLIER
UNIT INTAKE
MULTIPLIER
100.0
100.0
106.
106.lt
1718.8
100.0
159.6
l6U.lt
192.2
5603835 13702901;
193. U
193. U
Output
5.7
7.5
10.U
6.9
6.9
Water Intake
It.6
U.O
5.1
0.7
l.l
1.057
1.075
l.lOlt
1.069
1.069
.989
.965
.9U7
.938
.9U2
2257.5
16U.U
3.1
5.7
-1.5
-5.2?
1.031
1.057
.95U
.891
221.7
3.3
1.086
• 9U7
-------
cn
OJ
Industry Name and Production
Measure Used (and. source)
289 Miscellaneous Chemical Products -
Federal Reserve, Chemicals and
Products, 1961*, 68
29XX Petroleum Refining and Related
Industries10, 1959, 68
2911 Petroleum Refining - Federal Reserve,
Petroleum Products, 1959j 68
3000 Rubber and Miscellaneous plastic
Products - Federal Reserve, Rubber
and Plastics Products, 1959, 68
31XX Leather and Leather Products
Federal Reserve, Leather and
Products, 1959, 68
3111 Leather Tanning and Finishing -
Bus, Stat., Leather Production,
(ooo)'s of skins, hides, kips,
(total an)
3211 Flat Glass - Bus. Stat., deflate
(ooo)'s dollars manuf. shipments
by WPI for Nonmetallic Mineral
Production, 1959, 68
322 Glass and Glassware, Pressed or
Blown - Bus. Stat., Production of
Glass Containers, (ooo)'s of Gross
PRODUCTION
Index or Physical
Quantities1
1959 or 1961* 1968
159.6
103.7
110.7
105.0
81(591
329776
1514*01*
221.7
139.6
222.0
111.0
661*57
358592
22557911
ANNUAL
itput
8.6
o10
3.1*
PERCENT CHANGE
Water Intake2
23.0
0.9
0.9
OUTPUT
MULTIPLIER
1.086
1.000
1.031*
UMIT INTAKE
MULTIPLIER
l.lllli
1,009
.975
8.0
0.6
-2.6
0.9
lt.9
5.1
3.2
2.5
1.080
1.006
.971*
1.009
1.01*9
.971
1.026
1.051
.991
.951
-------
Industry Name and Production
Measure Used (incl. source) 1959
3231 Glass Products, Made of Purchased
Glass - Assume production characteristics
same as in 3211, Flat Glass, above
32ld Cement, hydraulic - Bus. Stat., (ooo)'s
barrels shipments of Portland cement 337966
325 Structural Clay Products - Bus. Stat.,
Brick, unglazed, millions of std. brick
shipments, 1961*, 68 771*3.8
326 Pottery and Related products - Assume
production characteristics same as
325, above
327 Concrete, Gypsum and Plaster Products -
Bus. Stat., Gypsum, (ooo)'s short tons,
calcined production, 1959, 68 9268.3
W 3281 Cut Stone and Stone Products - Federal
?? Reserve, Clay, Glass and Stone Products,
1959, 68 108.2
329 Nonmetallic Mineral Products - Federal
Reserve, Clay, Glass and Stone Products,
1959, 68 108.2
331 Blast Furnaces, Steel Works and Rolling
and Finishing Mills - Bus. Stat., Sheets
and strip, (ooo)'s short tons net
shipments, 1961*, 68 31*222
3312 Blast Furnaces and Steel Mills - Bus.
Stat., Production Index, raw steel,
1959, 68 96.2
PRODUCTION
ix or Physical
luantities1
1961* 1968
—
i 39731*3
ANNUAL
Output
0.9
1.8
_PERCEHT CHANGE
2
Water Intake
-2.0
-1.5
OUTPUT
MULTIPLIER
1.009
1.018
UNIT INTAKE
MULTI FLIER
.971
.967
7537.7
881(3.8
11*6.2
11,6.2
36621*
135.0
-0.7
-0.7
-0.5
3.1*
3.1*
1.7
3.8
U.6
3.2
2.5
2.1
3.5
.993
.993
.995
1.031*
1.031*
1.017
1.038
1.007
1.007
1.051
.998
.991
1.001*
.997
-------
Industry Name and Production
Measure Used (incl. source)
PRODUCTION
Index or Physical
Quantities'
1959 or 1961* 1968
ANNUAL PERCENT CHANGE
Output
Water Intake
OUTPUT UNIT INTAKE
MULTIPLIER MULTIPLIiE
332 Iron and Steel Foundries -
Bus. Stat., Malleable iron
castings, (ooo)'s short tons
shipments 1959, 68
3331 Primary Smelting and Refining of Copper -
Bus. Stat., Copper production, (ooo)'s
short tons primary refinery, 1959, 68
3332, Primary Smelting and Refining of Lead,
3333 Zinc - Bus. Stat.j (ooo)'s short tons-
mine recoverable Lead plus primary
smelter production of Slab Zinc, 1959, 68
3331* Primary Production of Aluminum -
Bus. Stat., (ooo)'s short tons of
Production, Primary Aluminum 1959, 68
O5
CO
331*1 Secondary Smelting and Refining
of Nonferrous Metals - Federal
Reserve, Nonferrous metals and
products, 1961*1 , 1968
335 Rolling, Drawing and Extruding of
Nonferrous Metals - Federal Reserve,
Nonferrous metals and products, 1961* 2
1968
916
1098.2
1051*. 3
1951*.!
138.3
138.3
1091*
ll*37.i*
1380.1
3255.0
160.0
160.0
2.0
3.0
3.0
5.8
3.7
3.7
1.7
2.1*
6.1*
1.6
1*.3
1.020
1.030
1.030
1.058
1.037
1.037
.997
.991*
1.031*
.958
.963
1.006
-------
Industry Name and Production
Measure Used (incl. source)
PRODUCTION
Index or Physical
Quantities1
1959 or 196k 1968
ANNUAL PERCENT CHANGE
Output
Water Intake
OUTPUT
MULTIPLIER
UNIT INTAKE
MULTIPLIER
336
339
Nonferrous Foundries - Federal
Reserve, Nonferrous metals and
products, 1961(12, 1968
Miscellaneous Primary Metal
Products - Federal Reserve,
Nonfarrous metals and products,
196U12, 1968
3UOO Fabricated Metal Products (except
ord., machinery, and trans, equip.)-
Federal Reserve, Fabricated metal
products, 1959, 68
3500 Machinery, Except Electrical -
Federal Reserve, Nonelectrical
Machinery, 1959, 68
3600 Electrical Machinery, Equipment
cm and Supplies - Federal Reserve,
OT Electrical Machinery, 1959, 68
3700 Transportation Equipment - Federal
Reserve, Transportation Equipment,
1959, 68
3900 Miscellaneous Manufacturing Industries
Federal Reserve, Miscellaneous
Manufactures, 1959, 68
138.3
138.3
105.li
105.3
109.1
160.0
160.0
167.9
181.0
188.5
179.5
3.7
3.7
5.3
107.6
6.3
6.2
U.6
12.0
16.7
5.0
1.1
3.5
2.1
1.037
1.037
1.053
1.062
1.063
1.062
1.0U6
1.083
1.130
.997
.9li9
.972
.959
.95k
-------
FOOTNOTES
lc In some cases, water intake data were not available for 1959; consequently 1961j production data were used with 196^ water intake data.
2. Computed from billions gallons water intake, 1963 and 196? Census of Manufactures, Water Use in Manufacturing, U.S. Department of Commerce.
3. 1969 Business Statistics, 0. S. Dept. of Commerce.
h. U. S. Dept. of Agriculture, Agriculture Statistics, 1968, 70.
5- From Federal Reserve Bulletin; 1968 Index from any bulletin in late 1969 (monthly); 1961j (where used) from any bulletin in late 1965.
1959 Index computed by re-basing 1959 index (as published in earlier years, on 1957 = 100 base) to 1957-59 = 100 so as to conform to
later years for consistency. This applies in all cases where we used the Federal Reserve Production Index.
6. Average of Indexes computed from production aggregates - Inorganic Chemicals Production (include sulfur, which appears in misc. products).
7. Average of Indexes computed from production aggregates - Organic Chemicals Production (also includes Alcohol).
8. h-digit water use not available; used 281 category for annual percent change for 2813, 2816.
9. Water intake based on 196U, 68 values (data not available for 1959).
10. Assume constant rate of output for this category; the latter is the remainder of industry 29 after the water significant component is removed.
11. 1968 not available, use 1967 as final year for annual percent change computation.
QJ 12. Federal Reserve Index for Nonferrous metals was not published in 1959; used 196U index to compare to 1961i data for water intake.
-------
PROJECTED INDUSTRIAL WASTE TREATMENT EXPENDITURES
THROUGH 1976
567
-------
Projected Expenditures in Millions of 1967 Dollars
by SIC Code
These tables show projected expenditures for waste treatment for speci-
fic SIC codes. There are three groups of costs on each table. The
first group is calculated with median efficiency, that is, unit flow
equal to or below the median region in which the SIC category is reported,
The second group calculates costs at 1968 efficiency, that is, with flow
data as it was reported for 1968. The third group costs are generated
using minimum unit flow data for regions in which the SIC category is
reported for all regions.
568
-------
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S I C -->
201 <--
PROBABLE COST (MEDIAN EFFICIENCY)
YF.AR
1968
1969
1970
1"71
1972
1973
1974
1975
1976
TOTAL
ft •§
8* YEAP
<%1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH
0.0
2.628
2.696
2.765
2.836
2.909
2.984
3.061
3.140
23.0
GROWTH
0.0
2.950
3.026
3.103
3.183
3.265
3.349
3.435
3.524
25.8
GROWTH
0.0
1.996
2.0*8
2.100
2.154
2.210
2.267
2.335
2.385
NET INVESTMENT
6.852
6.852
6.852
6.852
6.85?
6.852
6.852
6.852
6.852
61.7
NET INVESTMENT
8.240
8.240
8.240
8.240
8.240
8.240
8.240
8.240
8.240
74.2
NET INVESTMENT
4.122
4.122
4.122
4.122
4.122
4.122
4.122
4.122
4.122
REPLACEMENT
2.367
2.367
3.319
3.799
4.284
4.772
5.264
5.759
6.259
38.2
MAXIMUM COST
REPLACEMENT
2.436
2.436
3.559
4.126
4.698
5.273
5.852
6.436
7.024
41.8
MINIMUM COST
REPLACEMENT
2.231
2.231
2.845
3.156
3.470
3.787
4.106
4.428
4.754
REQUIREMENT
102.159
104.787
107.483
110.249
113.085
115.995
118.979
122.040
125.180
CAPITALIZATION
47.342
56.823
66.371
75.988
85.677
95.438
105.275
115.188
125.180
INTEREST
3.645
4.375
5.111
5.851
6.597
7.349
8.106
8.869
9.639
59.5
OPERATIONS
3.346
4.016
4.691
5.371
6.056
6.746
7.441
8.142
8.848
54.7
CASH RQMTS
16.211
20.239
22.668
24.639
26.625
28.628
30.648
32.684
34.738
237.1
(1968 EFFICIENCY)
REQUIREMENT
114.647
117.597
120.622
123.726
126.909
130.174
133.523
136.958
140.482
(MOST EFFICIENT
REQUIREMENT
77.589
79.585
81.633
83.733
85.887
88.097
90.364
92.688
95.073
CAPITALIZATION
48.730
59.919
71.184
82.527
93.950
105.455
117.044
128.719
140.482
REGION)
CAPITALIZATION
44.612
50.730
56.900
63.122
69.399
75.731
82.119
88.566
95.073
INTEREST
3.752
4.614
5.481
6.355
7.234
8.120
9.012
9.911
10.817
65.3
INTEREST
3.435
3.906
4.381
4.860
5.344
5.831
6.323
6.820
7.321
OPERATIONS
3.556
4.373
5.195
6.023
6.857
7.696
8.542
9.394
10.252
61.9
OPERATIONS
3.010
3.423
3.839
4.259
4.682
5.110
5.541
5.976
6.415
CASH RQMTS
17.985
22.612
25.501
27.847
30.211
32.594
34.995
37.416
39.857
269.0
CASH RQMTS
12.798
15.678
17.235
18.498
19.772
21.059
22.358
23.671
24.996
TOTAL
17.5
37.1
31.0
48.2
42.3
176.1
-------
• • • — — . — muj-t. . _ . . . .
PROJECTED EXPENDITURES TN Mill TON*; flF 1Q67 nni 1 AR<;
S I C ~>
202 < —
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
GROWTH
0.0
2.890
3.017
3.149
3.287
3.430
3.580
3.737
3.901
?7.0
NET INVESTMENT
7.078
7.078
7.078
7.078
7.078
7.078
7.078
7.078
7.078
63.7
REPLACEMENT
0.472
0.^72
1.475
1.986
2.504
3.030
3.563
4.103
4.652
22.3
MAXIMUM COST
REQUIREMENT
66.057
68.947
71.964
75.113
78.399
81.830
85.410
89.147
93.048
CAPITALIZATION
9.436
19.404
29.498
39.725
50.089
60.597
71.255
82.070
93.048
INTEREST
0.727
1.494
2.271
3.059
3.857
4.666
5.487
6.319
7.165
35.0
OPERATIONS
0.490
1.007
1.530
2.061
2.599
3.144
3.697
4.258
4.827
23.6
CASH RQMTS
8.766
12.941
15.371
17.332
19.324
21.348
23.404
25.495
27.623
171.6
(1968 EFFICIENCY)
uA
SYEAR
D 1968
1969
1970
1971
197?
1973
1974
197S
1976
TOTAL
YFAR
1968
1969
" 1970
1971
1 97?
1973
1974
1975
1976 ~
GROWTH
0.0
3.108
3.244
3.386
3.534
3.68tt
3.850
4.01H
4.194
29.0
GROWTH
0.0
2.058
2.148
2.242
2.341
2.443
2.550
2.661
2.778
NET INVESTMENT
7.630
7.630
7.630
7.630
7.630
7.630
7.630
7.630
7.630
68.7
NET INVESTMENT
4.965
4.965
4.965
4.965
4.965
4.965
4.965 '
4.965
4.965
REPLACEMENT
0.499
0.499
1.580
2.131
2.689
3.255
3.829
4.411
5.002
23.9
MINIMUM COST
REPLACEMENT
0.366
0.366
1.073
1.433
1.799
2.169
?.926
3.313
REQUIREMENT
71.025
74.133
77.376
80.762
84.296
87.984
91.834
95.852
100.046
(MOST EFFICIENT
REQUIREMENT
47.043
49.101
51.250
53.492
55.833
58.276
60.8?6
63.487
66. 261!
CAPITALIZATION
9.988
20.725
31.598
42.614
53.777
65.095
76.574
88.222
100.046
REGION)
CAPITALIZATION
7.323
14.346
21.460
28.667
35.973
43.381
50.896
58.522
66.265
INTEREST
0.769
1.596
2.433
3.281
4.141
5.012
5.896
6.793
7.704
37.6
INTEREST
0.564
1.105
1.652
2.207
2.770
3.340
3.919
4.506
5.102
OPERATIONS
0.530
1.100
1.677
2.262
2.854
3.455
4.065
4.683
5.310
25.9
OPERATIONS
0.361
0.707
1.058
1.413
17773
2.138
2.509
2.885
3.267
\"f. *
CASH RQMTS
9.428
13.933
16.564
18.689
20.848
23.040
25.269
27.535
29.840
185.1
CASH RQMTS
6.256
9.201
10.897
12.261
13.647
15.056
16.488
17.944
19.425
TOTAL
19.2
44.7
16.0
-------
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S I C — > ?03 < —
PROBABLE COST (MEDIAN EFFICIENCY)
YEAP
1968
1969
1970
1971.
1972
1973
1974
1975
1976
TOTAL
CJt
JjYEAR
(••11968
1969
197Q
1971
-1972
1973
1974
1975
1^76
TOTAL
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH
0.0
7.002
7.234
7.474
7.721
7.977
8.242
8.515
8.797
63.0
GROWTH
o.n
7.696
7.951
8.215
8.487
8.768
9.059
9.359
9.669
69.2
GROWTH
0.0
5.062
5.230
5.403
5.582
5.767
5.958
6.156
6.360
NET INVESTMENT
17.051
17.051
17.05)
17.051
17.051
17.051
17.051
17.051
17.051
153.5
NET INVESTMENT
19.378
19.378
19.378
19.378
19.378
19.378
19.378
19.378
19.378
174.4
NET INVESTMENT
10.547
10.547
10.547
10.547
10.547
10.547
10.547
10.547
10.547
REPLACEMENT
3.743
3.743
6.159
7.386
8.624
9.876
11.140
12.419
13.711
76.8
MAXIMUM COST
REPLACEMENT
3.859
3.859
6.579
7.959
9.35?
10.759
12.181
13.618
15.070
83.2
MINIMUM COST
REPLACEMENT
3.417
3.417
4.987
5.784
6.591
7.406
8.231
9.067
9.91?
REQUIREMENT
211.256
218.258
225.49?
232.966
240.687
248.664
256.906
265.421
274.218
CAPITALIZATION
74.851
98.903
123.188
147.712
172.484
197.512
222.805
248.370
274.218
INTEREST
5.764
7.616
9.485
11.374
13.281
15.208
17.156
19.125
21.115
120.1
OPERATIONS
3.296
4.355
5.425
6.505
7.596
8.698
9.812
10.937
12.076
68.7
CASH RQMTS
29.853
39.766
45.354
49.789
54.273
58.810
63.400
68.046
72.749
4B2.0
(1968 EFFICIENCY)
REQUIREMENT
232.199
239.895
247.846
256.061
264. 548
273.316
282.375
291.734
301.403
(MOST EFFICIENT
REQUIREMENT
152.721
157.783
163.01?
168.415
173.997
179.764
185.72?
191.878
198.237
CAPITALIZATION
77.178
104.251
131.580
159.172
187.037
215.183
243.619
272.356
301.403
REGION)
CAPITALIZATION
68.347
83.955
99.732
115.681
131.810
148.124
164.629
181.331
198.237
INTEREST
5.943
8.027
10.132
12.256
14.402
16.569
18.759
20.971
23.208
130.3
INTEREST
5.263
6.465
7.679
8.907
10.149
11.406
12.676
13.962
15.264
OPERATIONS
3.508
4.738
5.981
7.235
8.501
9.781
11.073
12.379
13.699
76.9
OPERATIONS
2.789
3.426
4.070
4.721
5.380
6.045
6.719
7.401
8.091
CASH RQMTS
32.687
43.698
50.0PO
55.042
60.120
65. 2B5
70.449
75.705
81.025
534.0
CASH RQMTS
22.016
28.917
32.513
35.362
38.248
41.171
44.132
47.132
50.173
TOTAL
45.5
94.9
58.8
91.8
48.6
339.7
-------
J C —>
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1973
1973
1974
1975
197-S
GROWTH
o.n
1.1 24
1.198
1.276
1.360
1.449
1 .544
1.645
1.753
NET INVESTMENT
1.608
1.608
1.608
1.608
1.608
1.608
1.608
1.608
1.608
REPLACEMENT
0.215
0.215
0.492
0.636
0.785
0.937
1.095
1.258
1.426
REQUIREMENT
17.167
18.291
19.489
20.765
22.125
23.574
25.118
26.763
28.516
CAPITALIZATION
4.300
7.033
9.839
12.724
15.692
18.749
21.902
25.155
28.516
INTEREST
0.331
0.542
0.758
0.980
1.208
1.444
1.686
1.937
2.196
OPERATIONS
2.191
3.583
5.012
6.482
7.994
9.551
11.157
18.814
14.526
CASH RQMTS
4.345
7.072
9.068
10.983
12.955
14.990
17.090
19.262
21.509
TOTAL 11.3
14.5
7.1
11.1 73.3 117.3
MAXIMUM COST (1968 EFFICIENCY)
QYEAR
fcpl96S
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH NET INVESTMENT
0.0 1.753
1.210
1.289
1.373
1.463
1.559
1.661 ]
.753
.753
.753
.753
.753
1.753
1.770 1.753
1.886 1.753
REPLACEMENT
0.222
0.222
0.523
0.679
0.840
1.005
1.176
1.352
1.534
REQUIREMENT CAPITALIZATION
18.47? 4.445
19.682
20.971
22.344
23.807
25.366
27.028
28.798
30.684
7.408
10.451
13.577
16.794
20.106
23.521
27.044
30.684
INTEREST
0.342
0.570
0.805
1.045
1.293
1.548
1.811
2.082
2.363
OPERATIONS
0.232
0.387
0.546
0.709
0.877
1.050
1.229
1.413
1.603
CASH RQMTS
2.550
4.143
4.915
5.560
6.227
6.916
7.630
8.371
9.139
TOTAL
12.2
15.8
7.6
11.9
8.0
55.5
MINIMUM COST (MOST EFFICIENT
YEAR
1968
1969
1971
1972
1973
1974
1975
1976
GROWTH NET INVESTMENT
0.0
0.770
0.821
0.875
0.932
0.993
1.058
1.127
1.008
.008
.008
.008
.008
.008
.008
.008
1.201 1.008
REPLACEMENT
0.185
0.185
0.365
0.460
0.557
0.657
0.760
0.867
0.977
REGION)
REQUIREMENT CAPITALIZATION
11.765
12.53S
13.356
14.231
15.163
16.156
17.214
18.341
19.543.
3.700
5.479
7.308
9.191
11.131
13.132
15.198
17.333
19.543 ~~
INTEREST
0.285
0.422
0.563
0.708
0.857
1.011
1.170
1.335
1.505
7 Q
OPERATIONS
0.171
0.253
0.338
0.425
0.515
0.607
0.703
O.S01
0.904
CASH RQMTS
1.649
2.639
3.095
3.475
3.868
4.27f
4.699
5.138
5.595
TOTAL
7.8
9.1
-------
TABLE
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S I C —> 3046
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1973
1973
1974
1975
1976
GROWfH NET
0.0
0.667
0.694
0.721
0.750
0.779
0.810
0.842
0.876
INVESTMENT
1.631
1.631
1.631
1.631
1.631
1.631
1.631
1.631
1.631
REPLACEMENT
0.192
0.192
0.423
0.541
0.660
0.780
0.902
1.026
1.151
REQUIREMENT CAPITALIZATION
16.885
17.552
18.246
18.967
19.717
20.497
21.307
22.149
23.025
3.833
6.132
8.458
10.810
13.191
15.602
18.044
20.518
23.025
INTEREST
0.295
0.472
0.651
0.832
1.016
1.201
1.389
1.580
1.773
OPERATIONS
0.183
0.292
0.403
0.515
0.628
0.743
0.859
0.977
1.096
CASH RQMTS
2.301
3.255
3.802
4.240
4.685
5.135
5.592
6.056
6.527
TOTAL
6.1
14.7
5.9
9.2
5.7
41.6
MAXIMUM COST (1968 EFFICIENCY)
,5|YeAR
tk> 1968
1969
1970
1971
J972
1973
1974
1975
1976
GROWTH NET
0.0
0.717
0.746
0.775
0.806
0.838
0.871
0.905
0.941
INVESTMENT
1.772
1.772
1.772
1.772
1.772
1.772
1.772
1.772
1.772
REPLACEMENT
0.199
0.199
0.449
0.576
0.705
0.836
0.968
1.102
1.237
REQUIREMENT CAPITALIZATION
18.146 3.974
18.863
19.609
20.384
21.190
22.027
22.898
23.803
24.744
6.462
8.980
11.526
14.104
16.713
19.355
22.032
24.744
INTEREST
0.306
0.498
0.691
0.888
1.086
1.287
1.490
1.696
1.905
OPERATIONS
0.191
0.310
0.431
0.553
0.677
0.802
0.929
1.058
1.188
CASH RQMTS
2.467
3.495
4.089
4.564
5.045
5.534
6.029
6.532
7.043
TOTAL
6.6
15.9
6.3
9*8.
6.1
TOTAL
4.?
9.4
4.2
6.5
3.6
44.8
YFA«
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH
0.0
0.457
0.475
0.494
0.514
0.534
0.555
0.577
0.600
NET INVESTMENT
1.041
1.041
1.041
1.041
1.041
1.041
1.041
1.041
1.041
MINIMUM COST
REPLACEMENT
0.162
0.16?
0.313
0.390
0.467
0.546
0.626
0.707
0.789
(MOST EFFICIENT REGION)
REQUIREMENT
11.567
12.024
12.500
12.994
13.507
14.041
14.596
15.173
15.773
CAPITALIZATION
3.243
4.740
6.256
7.791
9.345
10.919
12.515
14.133
15.773
INTEREST
0.250
0.365
0.482
0.600
0.720
0.841
0.964
1.088
1.215
OPERATIONS
0.138
0.202
0.267
0.333
0.399
0.466
0.534
0.604
0.674
CASH RQMTS
1.591
2.227
2.578
2.857
3.140
3.428
3.719
4.016
4.317
27.9
-------
\ UMLI
PROJFrTFH FxPFNnTTilftFS IN Mill Tnwc ncr tQ(,i nni i ADC:
S I C — >
20S(s,207 < —
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
197L
1972
1973
1974
1975
1976
TOTAL
GROWTH
0.0
-0.461
-0.453
-0.446
-0.439
-0.432
-0.425
-0.418
-0.411
-3.5
NET INVESTMENT
3.174
3.174
3.174
3.174
3.174
3.174
3.174
3.174
3.174
28.6
REPLACEMENT
0.159
0.159
0.430
0.567
0.703
0.841
0.978
1.116
1.254
6.2
MAXIMUM COST
REQUIREMENT
28.562
28.101
27.64B
27.202
26.763
26.331
25.906
25.488
25.077
CAPITALIZATION
3.174
5.886
8.606
11.334
14.069
16.810
19.559
22.315
25.077
INTEREST
0.244
0.453
0.663
0.873
1.083
1.294
1.506
1.718
1.931
9.8
OPERATIONS
0.156
0.290
0.423
0.558
0.692
0.827
0.962
1.098
1.234
6.2
CASH RQMTS
3.733
3.614
4.237
4.724
5.213
5.704
6.195
6.687
7.181
47.3
(1968 EFFICIENCY)
*3 YEAR
tf- 1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH
0.0
-0.488
-0.481
-0.473
-0.465
-0.458
-0.450
-0.443
-0.436
-3.7
GROWTH
0.0
-0.357
-0.351
-0.346
-0.340
-0.335
-0.329
-0.324
-0.319
NET INVESTMENT
3.364
3.364
3.364
3.364
3.364
3.364
3.364
3.364
3.364
30.3
NET INVESTMENT
2.459
2.459
2.45
-------
_ TABLE. . _
-—PgOJECTtj) EXPENDITURES IN BILLIONS OF JL? 6 7_OOLLAB_§_
S I C_ ^-_>_ ?Q61-2 <--
PROBABLE COST (MFOIAN EFFICIENCY)
YEAR GROWTH NET
196ft
1969
1970
197} _
197?
J973
1974
197S
1976
0.0
5.409
5.563
5.721
5.883
6.050
6.22?
6.399
6.5*1
INVESTMENT
19
19
19
19
19
19
19
19
19
.169
. 169
.169
.169
. 1*9
.169
.169
.169
.169
REPLACEMENT REQUIREMENT
1.B51
1.3bl
4.317
5.561
6. 814
8.075
9.344
10.623
11.910
190.379
195.788
201.351
207.07?
21?. 955
219.005
225.228
231.627
238.208
CAPITALIZATION
37.026
61.604
86.336
111.2?6
136.278
161.498
1H6.890
212.458
238.208
INTEREST OPERATIONS
2.
4.
6.
&,
10.
12.
14.
16.
18.
851
744
648
564
493
435
390
359
342
2.535
4.217
5.910
7,614
9.329
-LLL.Q55
12.793
14.543
16.306
CASH RQMTS
26.406"
35.390
41.
46,
51.
56.
61.
67.
72.
606
6?9
688
785
920
094
309
TOTAL
47.8
17?.5
60.3
94.8
84.3
459.8
MAXIMUM COST (1968 EFFICIENCY)
2" YEAR
CH.196" __
1969
. 1970
1971
1972
1973
1974
1975
1976
3ROWTH NE1
0.0
5.666
5.827
5.993
6.163
6.338
6.518
6.704
6.894
r INVESTMENT
20.176
20.176
20.176
20.176
20.176
20.176
20.176
20.176
20.176
REPLACEMENT
1.90?
1.90?
4.494
5.8.02
7.119
8.445
9.780
11.124
12.477
REQUIREMENT
199.439
205.105
210.933
216.926
223.089
229.428
235.946
242.650
249.544
CAPITALIZATION
38.033
63.875
89.878
116.047
142.386
168.900
195.595
222.474
249.544
INTEREST
2.929
4.918
6.92J
8.936
10.964
13.005
15.061
17.131
19.215
OPERATIONS
2.622
4.4Q4
6.197
8.002
9.818
11.646
13.487
15.340
17.207
CASH RQMTS
27.628
37.067
43.615
48.909
54.240
59.611
65.022
70.474
75.969
TOTAL.
50.1
181.6
63.0
99.1
.88.7.
482.5
MINIMUM COST (MOST EFFICIENT REGION)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH NET INVESTMENT
0.0
3.207
3.298
3.392
3.488
3.587
3.689
3.794
3.902
10.557
10.557
10.557
10.557
10.557
10.557
10.557
10.557
10.557
REPLACEMENT
1.421
1.421
2.802
3.499
4.201
4.908
5.621
6.338
7.061
REQUIREMENT
112.869
116.076
119.374
122.765
126.253
129.841
133.530
137.323
141.225
CAPITALIZATION
28.414
42.178
56.032
69.981
84.026
98.170
112.416
126.767
141.225
INTEREST
2.188
3. 248
4.314
5.389
6.470
7.559
8.656
9.761
10.874
OPERATIONS CASH RQMTS
1.789
2.656
3.529
4.407
5.292
6.182
7.079
7.983
8.894
15.955
21.088
24.500
27.243
30.008
32.794
35.602
38.433
41.288
TOTAL
28.4
95.0
37.3
58.5
47.8
266.9
-------
_ ..TABLE .. _ _
PROJECTED'EXPENDITURES IN MILLIONS OF 1967_DQLJLAg5.
S I ,_C -->_ ?Q63 < —
YFAR
1
1970 "
1971
197?
1973
1974
1975
197fcT
TOTAL
PROBABLE COST (MEDIAN EFFICIENCY)
GROWTH NET
0.0
-0.721
-0.714
-0.707
-0.701
-0.694
-0.6HH
-0.681
-0.675
-b.6
INVESTMENT
2.544
3.544
2.544
?.544
?.544
2.544
2.544
2.544
2.544
22.9
REPLACEMENT
2.841
2.841
3.023
3.115
3.207
3.300
3.393
3.486
3.579
28.8
MAXIMUM COST
REQUIREMENT CAPITALIZATION
77.168
76.447
75.733
75.026
74.325
73.631
72.943
72.262
71.587
(1968 EFFICIENCY)
56.814
53.638
60.468
62.305
64.148
65.998
67.855
69.718
71.587
INTEREST
4.375
4.515
4.656
4.797
4.939
5.082
5.225
5.368
5.512
44.5
OPERATIONS
3.405
3.514
3.624
3.734
3.845
3.956
4.067
4.178
4.291
34.6
CASH RQMTS
13.165
12.694
13.134
13.484
13.835
14.187
14.541
14.896
15.251
125.2
._
19*9
1970
"1971"
1972
1973
1974
1975
197A__
TOTAL
YpAR
1968'
1969
1970
1971
"1972 "
1973
1974
1975
1976
f OT AL~
GROWTH NET
0.0
-0.868
-0.860
-0.85?
-0.844
-0.836
-0.829
-0.821
-0.813
INVESTMENT
4.301
4.301
4.301
4.301
4.301
4.301
4.301
4.301
4.301
REPLACEMENT
2.929
2.929
3.272
3.445
3.618
3.791
3.964
4.138
4.313
REQUIREMENT
92.980
92.112
91.251
90.399
89.555
88.718
87.890
87.069
86.255
CAPITALIZATION INTEREST OPERATIONS
58.571 4.510 3.654
62.004
65.445
68.893
72.350
75.815
79.287
82.768
86.255
4.774
5.039
5.305
5.571
5.838
6.105
6.373
6.642
3.868
4.082
4.298
4.513
4.729
4.946
5.163
5.381
CASH RQMTS
15.393
15.003
15.835
16.496
17.158
17.822
18.488
19.155
19.823
-6.7
38.7
32.4
50.2
40.6
155.2
MINIMUM COST (MOST EFFICIENT REGION)
GROWTH
0.0
-0.481
-0.477
-0.472
-0.468
-0.463
-0.459
-0.455
-0.451
NF.T INVESTMENT
-0.307
-0.307
-0.307
-0.307
-0.307
-0.307
-0.307
-0.307
-0.307
REPLACEMENT
?.698
2.698
2.620
2.581
2.542
2.503
2.465
2.427
2.389
REQUIREMENT
51.510
51.029
50.552
50.080
49.612
49.149
48.690
48.235
47.78.5
CAPITALI7ATION
53.963
53.176
52.392
51.613
50.839
50.069
49.303
48.542
47.785
INTEREST
4.155
4.095
4.034
3.974
3.915
3.855
3.796
3.738
3.679
OPERATIONS
2.962
2.918
2.875
2.833
2.790
2.748
2.706
2.664
2.623
CASH RQMTS
9.508
8.923
8.746
8.609
8.472
8.337
8.302
8.067
7.934
-3.7
-2.8
22.9
-------
TARL
S I C -->
208 < —
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
CA
.a YEAR
•a 1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
GROWTH
0.0
1.903
1.938
1.975
2.012
2.049
2.088
2.127
2.167
16.3
GROWTH
0.0
2.034
2.072
2.110
2.150
2.190
2.231
2.273
2.316
17.4
NET INVESTMENT
10.741
10.741
10.741
10.741
10.741
10.741
10.741
10.741
10.741
96.7
NET INVESTMENT
11.517
11.517
11.517
11.517
11.517
11.517
11.517
11.517
11.517
103.7
REPLACEMENT
0.7d3
0.78T
?.049
2.685
3.322
3.962
4.603
5.247
5.892
29.3
MAXIMUM COST
REPLACEMENT
0.822
0.822
2.179
2.860
3.543
4.229
4.916
5.606
6.297
31.3
REQUIREMENT
101.581
103.484
105.42?
107.397
109.408
111.458
113.545
115.672
117.839
CAPITALIZATION
15.655
28.298
40.977
53.693
66.445
79.235
92.064
104.931
117.839
INTEREST
1.205
2.179
3.155
4.134
5.116
6.101
7.089
8.080
9.074
46.1
OPERATIONS
0.677
1.224
1.773
2.323
2.874
3.427
3.982
4.539
5.097
25.9
CASH RQMTS
13.406
16.829
19.656
21.857
24.065
26.280
28.503
30.733
32.970
214.3
(1968 EFFICIENCY)
REQUIREMENT
108.568
110.602
112.673
114.784
116.934
119.124
121.355
123.628
125.944
CAPITALIZATION
16.431
29.982
43.571
57.198
70.865
84.573
98.321
112.111
125.944
INTEREST
1.265
2.309
3.355
4.404
5.457
6.512
7.571
8.633
9.698
49.2
OPERATIONS
0.724
1.322
1.921
2.522
3.125
3.729
4.335
4.943
5.553
28.2
CASH RQMTS
14.328
18.003
21.043
23.414
25.792
28.177
30.570
32.972
35.381
229.7
MINIMUM COST
(MOST EFFICIENT
REGION)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH
0.0
1.414
1.441
1.468
1.495
1.523
1.552
1.581
1.610
NET INVESTMENT
7.843
7.843
7.843
7.843
7.843
7.843
7.843
7.843
7.843
REPLACEMENT
0.638
0.638
1.565
2.030
2.497
2.966
3.435
3.907
4.379
REQUIREMENT
75.503
76.917
78.358
79.826
81.321
82.844
84.396
85.977
87.58'7
CAPITALIZATION
12.757
22.015
31.299
40.610
49.948
59.314
68.709
78.133
87.587
INTEREST
0.982
1.695
2.410
3.127
3.846
4.567
5.291
6.016
6.744
OPERATIONS
0.514
0.888
1.262
1.637
2.014
2.391
2.770
3.150
3.531
CASH RQMTS
9.978
12.478
14.521
16.106
17.696
19.291
20.891
22.497
24.108
TOTAL
12.1
70.6
22.1
34.7
18.2
157.6
-------
— 1 HI H 1 . , _ _ ... .. ....
PROJECTED EXPENDITURES IN HIM IONS OF 1967 DOM ARS
S I C -->
309 < —
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1973
1973
1974
1975
1976
TOTAL
GROWTH
0.0
0.403
0.403
0.405
0.406
0.40S
0.410
0.411
0.413
3.3
NET INVESTMENT
10.375
10.375
10.375
10.375
10.375
10.375
10.375
10.375
10.375
93.4
REPLACEMENT
0.969
0.969
3.046
3.585
3.134
3.663
4.303
4.743
5.381
37.6
MAXIMUM COST
REQUIREMENT
103.368
103.770
103.173
103. 57R
103.984
104.393
104.801
105.313
105.635
CAPITALIZATION
19.373
30.148
40.935
51.705
63.486
73.368
84.053
94.838
105.635
INTEREST
1.493
3.331
3.151
3.981
4.811
5.642
6.472
7.303
8.133
43.3
OPERATIONS
1.225
1.906
2.587
3.269
3.951
4.632
5.314
5.996
6.678
35.6
CASH ROMTS
14.059
15.972
18.563
20.615
22.667
24.720
26.773
28.826
30.880
203.1
(1968 EFFICIENCY)
jYEAR GROWTH NE1
JPJ968 0.0
19b9
1970
1971
1972
1973
1974
1975
1976
0.439
0.441
0.443
0.445
0.446
0.448
0.450
0.453
F INVESTMENT
11.446
11.446
11.446
11.446
11.446
11.446
11.446
11 .446
11.446
REPLACEMENT REQUIREMENT
1.023 112.013
1.033
2.211
2.805
3.400
3.994
4.589
5.184
5.779
L12.451
12.893
13.335
13.780
14.236
14.675
15.134
15.576
CAPITALIZATION
20.443
33.329
44.216
56.105
67.996
79.888
91.782
103.678
115.576
INTEREST
1.574
2.489
3.405
4.320
5.236
6.151
7.067
7.983
8.899
OPERATIONS
1.330
2.103
2.877
3.650
4.424
5.198
5.972
6.746
7.520
CASH RQMTS
15.373
17.500
20.380
22.665
24.950
27.236
29.522
31.809
34.096
TOTAL
YEAR
1968
1969^
T970
J971
197?"
1973
1974
1975
1976
TOTAL
3.6
103.0
30.0
47.1
39.8
223.5
GROWTH
0.0
0.291
0.292
0.293
0.295
0.296
0.297
0.298
0.299
NET INVESTMENT
7.24R
7,?48
7.24fl
7.248
7.348
7.348
7.248
7.248
7.248
MINIMUM COST
REPLACEMENT
O.H12
O.HI?
I.b66
1.943
2.330
3.698
3.075
3.4S2
3.829
(MOST EFFICIENT REGION)
REQUIREMENT
74.326
74.517
74.810
75.103
75.398
75.693
75.990
76.388
76.588
CAPITALIZATION
16.345
23.784
31.324
38.865
46.407
53.950
61.495
69.041
76.588
INTEREST
1.251
1.831
2.412
2.993
3.573
4.154
4.735
5.316
5.897
OPERATIONS
0.948
1.388
1.829
2.269
2.709
3.149
3.590
4.030
4.471
CASH RQMTS
10.259
11.571
13.347
14.746
16.145
17.545
18.944
20.344
21.744
2.4
65.3
20.
-------
TABLE
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S I C —> ?21
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR GROWTH NET
196ft (
1969
1970
1971
1972
1973
197.4
197S
1976
).0
.431
.395
.360
.3?6
.293
.260
.229
.19s
INVESTMENT
5.134
5.134
5.134
5.134
5.134
5.134
5.134
5.134
5.134
REPLACEMENT
0.799
0.799
1.171
1.360
1.550
1.742
1.936
2.131
2.328
REQUIREMENT CAPITALIZATION
57.055
55.624
54.229
52.868
51.54?
50.249
48.989
47.760
46.562
15.985
19.687
23.426
37.199
31.007
34.848
38.721
42.626
46.562
INTEREST
1.231
1.516
1.804
2.094
2.388
2.683
2.982
3.282
3.585
OPERATIONS
0.630
0.775
0.923
1.071
1.221
1.372
1.525
1.679
1.834
CASH RQMTS
7.793
6.793
7.636
8.299
8.967
9.639
10.316
10.997
11.683
TOTAL -10.5
46.2
13.8
21.6 11.0 82.1
MAXIMUM COST (1968 EFFICIENCY)
en
«£» 1968
1969
.J.i7JL_
1971
1972
1973
1974
1975
1976
GROWTH NET
0.0
-1.466
-1.430
-1.394
-1.3S9
-1.325
-1.291
-1.259
INVESTMENT REPLACEMENT
5.?90 0.807
5.290 0.807
5.290 .191
5.290
5.290
5.?90
5.290
.386
.563
.781
.981
5.290 2.182
5.290 2.335
REQUIREMENT CAPITALIZATION
58.458 16.141
56.992
55.562
52.810
51.485
50.193
48.934
47.707
19.964
23.824
27.720
31.651
35.616
39.614
43.645
47.707
INTEREST
1.243
1.537
1.834
2.134
2.437
2.742
3.050
3.361
3.673
OPERATIONS
0.643
0.796
0.950
1.105
1.262
1.420
1.579
1.740
1.901
CASH RQMTS
7.983
6.963
7.835
8.521
9.212
9.908
10.608
11.313
12.022
TOTAL -10.B
47.6
14.1
22.0
11.4
84.4
MINIMUM COST (MOST EFFICIENT REGION)
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH NET
0.0
-1.377
-1.342
-1.3on
- .27^
- .244
- .212
- .18?
- .1S2
INVESTMENT
4.892
"+.P92
4.892
4.89?
4.892
4.89?
4.89?
4.892
4.892
REPLACEMENT
0.787
0.787
l.ltO
1.320
l.bOn
1.683
1.867
2.052
2.239
REQUIREMENT
54.88?
53.505
52.163
50.855
49.579
48.335
47.123
45.941
44.789
CAPITALIZATION
15.743
19.259
22.809
26.393
30.010
33.658
37.338
41.049
44.789
INTEREST
1.212
1.483
1.756
2.032
2.311
2.592
2.875
3.161
3.449
OPERATIONS
0.613
0.750
C
1.888
.027
.168
.310
.453
.598
.743
CASH RQMTS
7.504
6.535
7.335
7.963
8.596
9.233
9.875
10.521
11.171
TOTAL
-10.1
44.0
13.4
20.9
10.5
78.7
-------
TARI F
EXPENDITURES IN MILLIONS OF 19^7 DOLLAR;
S .1 C —>
PROBABLE COST (MEDIAN EFFICIENCY)
YFAR
"196*"
GROWTH NtT INVESTMENT REPLACEMENT
0.0
1.011
l.Otil
1. 1S6
1.237
1.323
1.415
1.514
1.619
0.608
0.60«
0.608
0.-S08
0.60H
0.608
0.608
0.608
0.608
0.483
0.4d3
0.648
0.737
0.829
0.925
1.026
1.133
1.244
REQUIREMENT CA
14.521
15.53?
16.61T
17.769
19.006
20.329
21.744
23.258
24.877
iPITALIZATION
9.659
11.277
12.966
14.730
16.575
18.506
20.529
22.65.0
24.877
INTEREST
0.744
0.868
0.998
1.134
1.276
1.425
1.581
1.744
1.916
OPERATIONS CASH RQMTS
0.367
0.428
0.492
0.559
0.629
0.702
0.779
0.859
0.944
2.201
3.398
3.828
4.194
4.579
4.983
5.409
5.857
6.330
1970
1971
197?
1973
1974
.J,?7S.
1976
TOTAL
10.4 5.5
7.5
11.7 5.8 40.8
MAXIMUM COST (1968 EFFICIENCY)
j YEAR GROWTH NET
D 1968 0.0
1969
1970
1971
1972
1973
1974
1975
1976
1.105
.182
.265
.353
.447
.546
.655
.771
INVESTMENT
0.759
0.759
0.759
0.759
0.759
0.759
0.759
0.759
0.759
REPLACEMENT
0.490
0.490
0.681
0.782
0.888
0.998
1.113
1.234
1.360
REQUIREMENT CAPITALIZATION
15.881 9.810
16.986
18.169
19.434
20.786
22.233
23.781
25.436
27.207
11.674
13.616
15.639
17.751
19.956
22.263
24.677
27.207
INTEREST
0.755
0.899
1.048
1.204
1.367
1.537
1.714
1.900
2.095
OPERATIONS
0.379
0.451
0.526
0.605
0.686
0.772
0.861
0.954
1.052
CASH RQMTS
2.384
3.705
4.197
4.614
5.052
5.512
5.995
6.502
7.037
TOTAL
11.3
6.8
8.0
12.5
6.3
45.0
YEAR GROWTH NFT
1968 0.0
1969 0.973
1970
1971
1972
1973
1974
1975
.041
.113
.191
.274
.363
.457
1976 1.559
TOTAL 10.0
INVESTMENT
0
0
0
0
0
0
0
0
0
4
.548
.548
.548
.548
.548
.548
.548
.548
.54ft
.9
MINIMUM COST
REPLACEMENT
0.480
0.480
0.635
0.719
0.805
0.897
0,992
1.092
1.198
7.3
(MOST EFFICIENT
REGION)
REQUIREMENT CAPITALIZATION
13.982
14.955
15.996
17.110
18.301
19.575
20.937
22.395
23.953
9
11
12
14
16
17
19
21
23
.599
.120
.709
.370
.109
.931
.841
.847
.953
INTEREST
0
0
0
1
1
1
1
1
1
11
.739
.856
.979
.107
.240
.381
.528
.682
.844
.4
OPERATIONS
0.362
0.420
0.480
0.543
0.608
0.677
0.749
0.825
0.905
5.6
CASH RQMTS
2.129
3.277
3.683
4.029
4.393
4.776
5.180
5.605
6.053
39.1
-------
TABLE
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S I C —> 223
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
19-76
GROWTH, NET
0.0
0.292
0.293
0.295
0.297
0.299
0.301
0.302
0.304
INVESTMENT
4.260
4.260
4.260
4.260
4.260
4.260
4.260
4.260
4.260
REPLACEMENT
0.693
0.693
1.148
1.376
1.603
1.831
2.059
2.288
2.516
REQUIREMENT CAPITALIZATION
47.933
48.225
48. SIR
48.813
49.110
49.408
49.709
50.011
50.315
13.850
18.402
22.956
27.511
32.068
36.627
41.188
45.751
50.315
INTEREST
1.066
1.417
1.768
2.118
2.469
2.820
3.172
3.523
3.874
OPERATIONS
0.498
0.662
0.826
0.989
1.153
1.317
1.481
1.646
1.810
CASH RQMTS
6.517
7.323
8.295
9.039
9.783
10.528
11.373
12.019
12.764
TOTAL 2.4
38.3 14.2
22.2 10.4 87.5
MAXIMUM COST (1968 EFFICIENCY)
SYEAR
£1-1968 _
1969
_ 1?70
1971
197?
1973
J974
1975
1976
GROWTH NET
0.0
0.307
0.309
0.311
0.313
0.315
0.317
0.319
0.320
INVESTMENT
4.545
4.545
4.545
4.545
4.545
4.545
4.545
4.545
4.545
REPLACEMENT
0.707
0.707
1.192
1.435
1.678
1.921
2.164
2.407
2.650
REQUIREMENT CAPITALIZATION
50.497 14.135
50.804
51.113
51.424
51.737
52.051
52.368
52.686
53.007
18.988
23.842
28.698
33.556
38.416
43.278
48.141
53.007
INTEREST OPERATIONS
1.088 0.516
1.462
1.836
2.210
2.584
2.958
3.332
3.707
4.082
0.693
0.870
1.047
1.224
1.401
1.579
1.756
1.934
CASH RQMTS
6.856
7.714
8.752
9.548
10.344
11.140
11.937
12.734
13.531
TOTAL_
40.9
14.9
23.3
11.0
92.6
MINIMUM COST (MOST EFFICIENT REGION)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH NET
0.0
0.251
0.252
0.254
0.255
0.257
O.P58
0.260
0.261
INVESTMENT
3.513
3.513
3.513
3.513
3.513
3.513
3.513
3.513
3.513
REPLACEMENT
0.655
0.655
1.032
1.220
1.408
1.597
1.785
1.974
2.163
REQUIREMENT
41.204
41.455
41.707
41.960
42.216
42.472
42.731
42.991
43.25?
CAPITALIZATION
13.103
16.866
20.631
24.397
28.165
31.934
35.705
39.478
43.252
INTEREST
1.009
1.299
1.589
1.879
2.169
2.459
2.749
3.040
3.330
OPERATIONS
0.453
0.583
0.713
0.843
0.973
1.104
1.234
1.364
1.495
CASH RQMTS
5.630
6.300
7.098
7.708
8.318
8.929
9.540
10.151
10.762
TOTAL
2.0
31.6
12.5
19.5
8.8
74.4
-------
TAB! E
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
s I c —>
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
GROWTH
0.0
?.775
2.964
3.166
3.382
3.612
3.858
4.121
4.402
28.3
NET INVESTMENT
3.457
3.457
3.457
3.457
3.457
3.457
3.457
3.457
3.457
31.1
REPLACEMENT
0.655
0.655
1.287
1.618
1.960
2.314
2.680
3.058
3.451
17.7
MAXIMUM COST
REQUIREMENT
40.747
43.52?
46.487
49.653
53.035
56.647
60.505
64.626
69.028
CAPITALIZATION
13.092
19.324
25.745
32.368
39.207
46.276
53.591
61.169
69.028
INTEREST
1.008
1.488
1.982
2.492
3.019
3.563
4.127
4.710
5.315
27.7
OPERATIONS
0.730
1.077
1.436
1.805
2.186
2.580
2.988
3.411
3.849
20.1
CASH RQMTS
5.850
9.452
11.126
12.539
14.004
15.526
17.109
18.757
20.474
124.8
(1968 EFFICIENCY)
CO YEAR
CO 1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
GROWTH
0.0
3.083
3.293
3.518
3.757
4.013
4.286
4.578
4.890
31.4
NET INVESTMENT
3.959
3.959
3.959
3.959
3.959
3.959
3.959
3.959
3.959
35.6
REPLACEMENT
0.680
0.680
1.394
1.768
2.154
2.553
2.965
3.392
3.834
19.4
REQUIREMENT
45.269
48.352
51.646
55.163
58.920
62.933
67.220
71.798
76.688
CAPITALIZATION
13.594
20.637
27.890
35.366
43.083
51.055
59.301
67.839
76.688
INTEREST
1.047
1.589
2.147
2.723
3.317
3.931
4.566
5.224
5.905
30.4
OPERATIONS
0.782
1.188
1.605
2.035
2.479
2.938
3.412
3.904
4.413
22.8
CASH RQMTS
6.468
10.499
12.399
14.004
15.667
17.394
19.189
21.057
23.002
139.7
YEAR
1968
1969
1970
1971
197?
1973
T9T4
1975
1976
GROWTH
0.0
2.376
2.538
2.711
2.896
3.093
3.304
3.529
3.769
NET INVESTMENT
2.806
2.806
2.«06
2.806
2.806
2.806
2.806
2.806
2.806
MINIMUM COST
REPLACEMENT
0.622
0.622
1.148
1.424
1.709
2.004
2.310
2.626
2.955
(MOST EFFICIENT
REQUIREMENT
34.889
37.265
39.803
42.514
45.410
48.503
51.807
55.335
59.104
REGION)
CAPITALIZATION
12.441
17.623
22.967
28.484
34.186
40.085
46.195
52.529
59.104
INTEREST
0.958
1.357
1.768
2.193
2.632
3.087
3.557
4.045
4.551
OPERATIONS
0.662
0.938
1.222
1.516
1.820
2.134
2.459
2.796
3.146
CASH RQMTS
5.048
8.099
9.483
10.651
11.863
13.123
14.435
15.802
17.227
TOTAL
?4.2
25.3
-------
IABLEL
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
I C —> ?2XX
P^OBABLt COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971... ..
197?
1973
1974
1975
1976
TOTAL
rn
OO YEAR
«_196«
1969
1970
1971
197£ .
1973
1974
1975
1976
TOTAL
YEAH
1968
19 (S 9
1970
1971
1972
1973
1974
1975
1976
GROWTH
0.0
5.078
5.423
5.793
6.187
6.609
7.059
7.540
8.053
51.7
GROWTH
0.0
5.536
5.913
6.316
6.746
7.205
7.696
8.220
8.780
56.4
GROWTH
0.0
4.497
4.803
5.130
5.480
5.853
6.251
6.677
7.132
NET INVESTMENT
7.213
7.213
7.?13
7.213
7.213
7.213
7.213
7.213
7.213
64.9
NET INVESTMENT
7.961
7.961
7.961
7.961
7.961
7.961
7.961
7.961
7.961
71.6
NET INVESTMENT
6.265
6.265
6.265
6.265
6.265
6.265
6.265
6.265
6.265
REPLACEMtNT
O.B42
O.b42
2.0«9
2.739
3.40->
4.100
4.614
5.bSl
6.315
30.7
MAXIMUM COST
REPLACEMENT
0.880
0.880
2.248
2.962
3.697
4.456
5.238
6.048
6.885
33.3
MINIMUM COST
REPLACEMENT
0.795
0.795
1.H86
2.456
3.044
3.649
4.275
4.922
5.592
REQUIREMENT
74.549
79.627
85.050
90.843
97.030
103.639
110.697
118.237
126.290
CAPITALIZATION
16.847
29.137
41.773
54.779
68.179
82.000
96.272
111.024
126.290
INTEREST
1.297
2.244
3.217
4.218
5.250
6.314
7.413
8.549
9.724
48.2
OPERATIONS
0.805
1.392
1.996
2.617
3.258
3.918
4.600
5.305
6.034
29.9
CASH RQMTS
10.157
16.768
19.937
22.580
25.316
28.154
31.098
34.157
37.339
225.5
(1968 EFFICIENCY)
REQUIREMENT
81.279
66.815
V2.728
99.044
105.789
112.995
120.691
128.911
137.691
(MOST EFFICIENT
REQUIREMENT
66.022
70.519
75.322
80.452
85.932
91.784
98.036
104.713
111.845
CAPITALIZATION
17.595
31.091
44.965
59.241
73.947
89.113
104.770
120.951
137.691
REGION)
CAPITALIZATION
15.899
26.661
37.730
49.125
60.870
72.988
85.505
98.448
111.845
INTEREST
1.355
2.394
3.462
4.562
5.694
6.862
8.067
9.313
10.602
52.3
INTEREST
1.224
2.053
2.905
3.783
4.687
5.620
6.584
7.580
8.612
OPERATIONS
0.865
1.528
2.210
2.911
3.634
4.379
5.148
5.943
6.766
33.4
OPERATIONS
0.742
1.244
1.761
2.292
2.841
3.406
3.990
4.594
5.219
CASH RQMTS
11.060
18.298
21.794
24.711
27.731
30.862
34.111
37.485
40.994
247.0
CASH RQMTS
9.027
14.854
17.621
19.927
22.316
24.794
27.366
30.040
32.821
TOTAL
45.8
56.4
27.4
43.0
26.1
198.8
-------
XA8LE
.PROJECTED EXPENDITURES TKI MILLIONS OF 19
-------
TABLE
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
s - !
— > 261
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
J969
1970
197J
1978
..J973
1974
1?75
1976
TOTAL
GROWTH
0.0
-0.195
-0.19-i
-0.195
-0.195
. -0.195._
-0.195
-0.195
-0.195
-1.6
NET INVESTMENT
49.527
49.527
49.527
49.527
49.527
49.527
49.527
49.527
49.527
445.7
REPLACEMENT
4.578
4.578
9.512
11.978
14.445
16.911
19.378
21.845
24.311
127.5
REQUIREMENT
487.78?
487.587
487.39?
487.197
487.003
486.807
486.61?
486.418
486.223
CAPITALIZATION
91.567
140.899
190.231
239.562
288.894
338.227
387.559
436.891
486.223
INTEREST
7.051
10.849
14.648
18.446
22.245
26.043
29.842
33.641
37.439
200.2
OPERATIONS
6.028
9.275
12.522
15.770
19.017
22.264
25.512
28.759
32.006
171.2
CASH RQMTS
67.183
74.034
86.013
95.526
105.039
114.551
124.064
133.576
143.089
943.1
MAXIMUM COST (1968 EFFICIENCY)
1969
197Q
1971
1972
1973
1974
1975
1976
TOTAL
GROWTH NET INVESTMENT
0.0 72.245
-0.277
-a, 27 7
-0.277
-Q.,277
-0.276
. -Q.276
-0.276
-0.276
72.245
72.245
72.245
72.245
72.245
72.245
72.245
72.245
REPLACEMENT
5.714
5.714
12.911
16.509
20.108
23.706
27.305
30.903
34.50?
REQUIREMENT
692.243
691.966
691.689
691.413
69J.136
690.860
690.583
69Q.307
690.031
CAPITALIZATION
114.285
186.253
258.221
330.189
474.125
546.094
618.062
690.031
INTEREST
a. aoo
14.341
19.883
25.425
30.966
36.508
42.049
47.591
53.132
OPERATIONS
7.579
12.352
17.125
21.898
26.671
31.444
36.216
40.989
45.762
CASH RQMTS
94.338
104.376
121.887
135.800
149.713
163.6.26
177.539
191.452
205.365
_65p_._2 177.4_
278.7
24Q.Q
1344.1
1968
1970
1971
1972
1973
1974
197S
1976
TOTAL
MINIMUM COST (MOST EFFICIENT REGION)
GPOIivTH
0.0
-0.101
-0.101
-0.101
-0.101
-n.ioi
-0. 101
-0.101
-0.101
MtT INVESTMENT
23.509
23.509
23.509
23.509
23.509
23.509
23.509
23.509
^3.509
REPLACEMENT
3.277
3.277
5.618
6.789
7.959
9.129
10.300
11.47Q
12.641
REQUIREMENT
253.625
253.524
253.422
253.321
253.219
253. 11R
253.017
25?. 916
252. B15
CAPITALIZATION
65.549
88.957
112.365
135.774
159.182
182.590
205.998
229.406
252.815
_. INTEREST
5.047
6.850
8.652
10.455
12.257
14.059
15.862
17.664
19.467
OPERATIONS
4.264
5.787
7.310
8.832
10.355
11.878
13.401
14.924
16.446
CASH RQMTS
36.098
39.322
44.988
49.484
53.979
58.475
62.971
67.466
71.962
-0.8
211.6
70.5
110.3
93.2
484.7
-------
TABLE
S I C -_-> ?6?
PROflABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
197(1
197?
1973
1974
1975
1976
TOTAL """
JTS
1970
loTT
1973
1974
197S
1976
TOTAL
-ISS-
1971
l*7|
1975
Vortl
.GROj/.TH
0.0
3.851
3.884
3.918
3.95?
3^986
4.020
4.055
4.Q90
31.8
GROWTH
0.0
4.348
4.386
4.424
4.462
4.501
4.540
4.579
4.619
35.9
GROWTH
0.0
2.367
2.388
2.408
2.429
2.450
2.471
2.493
2.514
19.5
NET INVESTMENT
28. 9H?
28.98?
28.982
28.982
28. 9R?
28.982
28.982
26.982
28.98?
260.8
NET INVESTMENT
35.368
35.368
35.368
35.368
35.368
35.368
35.368
35.368
35.368
318.3
NET INVESTMENT
9.938
9.938
9.938
9.938
9.938
9.938
9.938
9.938
9.938
89.4
REPLACEMENT
10.651
10.651
13.935
15.580
17.227
18.875
20.526
2?. 177
23.831
153.5
MAXIMUM COST
REPLACEMENT
10.970
10.970
14.943
16.933
18.934
20.918
22.913
24.910
26.910
168.4
MINIMUM COST
REPLACEMENT
9.698
9.698
10.930
11.547
12.165
12.785
13.405
14.027
14.649
108.9
REQUIREMENT
444.865
44B.716
452.600
456.518
460.469
464.455
468.475
472.530
476.621
CAPITALIZATION
213.011
245.843
278.709 .
311.609
344.542
377.510
410.512
443.549
476.621
INTEREST
16.402
18.930
21.461
23.994
26.530
29.068
31.609
34.153
36.700
238.8
OPERATIONS
16.222
18.723
21.226
23.731
26.240
28.750
31.264
33.780
36.298
236.2
CASH ROMTS
72.257
81.136
89.488
96.205
102.930
109.662
116.401
123.147
129.901
921.1
(1968 EFFICIENCY)
REQUIREMENT
502.338
506.686
511.072
515.496
519.958
524.459
528.999
533.578
538.196
(MOST EFFICIENT
REQUIREMENT
273.468
275.835
278.223
280.631
283.060
285.510
287.98?
290.475
292.989
CAPITALIZATION
219.397
259.113
298.866
338.658
378.487
418.356
458.263
498.210
538.196
REGION)
CAPITALIZATION
193.967
206.271
218.597
230.943
243.310
255.697
268.106
280.537
292.989
INTEREST
16.894
19.952
23.013
26.077
29.144
32.213
35.286
38.362
41.441
262.4
INTEREST
14.935
15.883
16.832
17.783
18.735
19.689
20.644
21.601
22.560
168.7
OPERATIONS
17.481
20.646
23.813
26.984
30.158
33.334
36.514
39.697
42.883
271.5
OPERATIONS
12.935
13.756
14.578
15.401
16.226
17.052
17.879
18.708
19.539
146.1
CASH RQMTS
80.712
91.283
101.523
109.785
118.055
126.334
134.621
142.916
151.220
1056.5
CASH ROMTS
47.507
51.642
54.665
57.077
59.493
61.913
64.338
66.767
69.200
532.6
-------
YEAR
1968
1970
197J
1972
1973
1974
1975.
1976
, 1968
1969
1970
1971
197?
1973
1974
1975
1976
TOTAL
YFA3
1968
1970
1^71
197?
1973
1974
1975
1976
TOTAL
— - iM-n I . _ —
PROJECTED FXPFNDTTIIRF9 IN MIIIION<; OF 1967 DOLLARS
S I C -->
263 < —
•
PROBABLE COST (MEDIAN EFFICIENCY)
GROWTH
0.0
._ll-'283
11.811
.12.364.
12.943
...13.548
14.182
J4.846
15.541
106.5
GROWTH
0.0
13.415
14.043
14.700
15.388
16. 10-3
16.86?
17-651
I«..ft77_
126.6
GROWTH
0.0
6.928
7.25^
7.591
7.947
8.31ft
ft. 708
9. lib
9.542
65.4
NET INVESTMENT
~ 1 0 .~5~35 "
10.535
10.535
10.535
10.535
10.535
10.535
10.535
10.535
94.8
NET INVESTMENT
15.597
15.597
15.597
15.597
15.597
15.597
15.597
15.597
15.597
140.4
NET INVESTMENT
n."l93
0.193
0. 1^3
0.19?
0.193
0.193
0.193
0.193
6.193
1.7
REPLACEMENT
7.84?
7.84?
10.050
11.195
12.369
13.573
14.809
16.078
17.382
111.1
MAXIMUM COST
REPLACEMENT
8.095
8.095
11.028
12.543
14.092
15.677
17.300
18.962
20.666
._ . 126.5
MINIMUM COST
RFPLACEMENT
7.325
7.325
8.053
B. 44?.
8.849
9.275
9.720
in. IMS
10.672
79.8
REQUIREMENT
241.115
252.398
264.209
276.573
289.516
303.064
317.246
332.09?
347.633
CAPITALIZATION
156.839
178.656
201.002
223.901
247.378
271.460
296.177
321.558
347.633
INTEREST
12.077
13.757
15.477
17.240
19.048
20.902
22.806
24.760
26.768
172.8
OPERATIONS
11.263
12.830
14.434
16.079
17.765
19.494
21.269
23.092
24.964
161.2
CASH RQMTS
41.716
56.246
62.307
67.413
72.659
78.052
83.600
89.310
95.189
646.5
(1968 EFFICIENCY)
REQUIREMENT
286.676
300.091
314.134
32«.835
344.223
360.331
377.193
394.844
413.321
(MOST EFFICIENT
REQUIREMENT
148.043
154.971
162.223
169.814
177.761
186.079
194.787
203.902
213/444
CAPITALIZATION
161.901
190.913
220.553
250.850
28J.835
313.540
345.999
379.247
413.321
REGION)
CAPITALIZATION
146.497
153.618
161.064
168.848
176.988
185.500
194.401
203.709
213.444
INTEREST
12.466
14.700
16.983
19.315
21.701
24.143
26.642
29.202
31.826
197.0
INTEREST
11.280
11.829
12.402
13.001
13.628
14.283
14.969
15.686
16.435
123.5
OPERATIONS
12.450
14.681
16.960
19.290
21.673
24.111
26.607
29.164
31.784
196.7
OPERATIONS
9.174
9.620
10.086
10.574
11.084
11.617
12.174
12.757
13.367
100.5
CASH RQMTS
48.608
66.488
74.610
81.445
88.451
95.636
103.008
110.576
118.350
787.2
CASH RQMTS
27.973
35.895
37.987
39.802
41.701
43.687
45.764
47.937
50.209
371.0
-------
-- - - IABLE ___ .
__pRQJf CJE_0. .EXP£M)I HIRESIN MILLIONS OF 1,967 DOLLARS
5 I C —>._.?64
PtfOHABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1970
1971
197?
1973
1974
1975
197"6
TOTAL
yi
CO
_
1969
1970
197 1
GROWTH NET IMVFSTMFNT
0.0
.. . 9,?Q1
0.94?
0.984
1.026
1.075
1.123
1.174
1.226
1.854
1.354
1.854
1.854
1.854
1.854
1.854
1.854
1.854
REPLACEMENT
0.260
0.260
0.537
0.679
0.823
0.970
1.119
1.270
1.434
REQUIREMENT CAPITALIZATION INTEREST
20.027
20.928
21.870
22.854
23.883
24.957
26.080
27.254
28.480
5.193
7.949
10.745
13.583
16.466
19.395
22.372
25.400
28.480
0.400
0.612
0.827
1.046
1.268
1.493
1.723
1.956
2.193
OPERATIONS CASH RQMTS
0.378
0.579
0.782
0.989
1.199
1.412
1.629
1.849
2.073
2.692
4.206
4.943
5.552
6.173
6.80*
7.447
8.103
8.771
"T973
1974
1975
1976
TOTAL
YEAR
1968
1969
1970
1971
1973
1973
1974
1975
1976
"TOTAL""
8.5
16.7
7.3
MAXIMUM COST
11.5
10.9
54.9
(1968 EFFICIENCY)
GROWTH NFT
0.0
0.964
1.007
1.053
1.100
1.150
1.201
1.255
1.312
9.0
INVESTMENT
2.009
2.009
2.009
2.009
2.009
2.009
2.009
2.009
2.009
18.1
REPLACEMENT
0.267
0.267
0.567
0.720
0.875
1.033
1.194
1.357
1.523
7.8
REQUIREMENT
21.421
22.385
23.392
24.445
25.545
26.694
27.896
29.151
30.463
CAPITALIZATION
5.348
8.321
11.338
14.399
17.508
20.667
23.877
27.142
30.463
INTEREST
0.412
0.641
0.873
1.109
1.348
1.591
1.839
2.090
2.346
12.2
OPERATIONS
0.401
0.624
0.851
1.080
1.313
1.550
1.791
2.036
2.285
11.9
CASH RQMTS
3.090
4.505
5.307
5.971
6.646
7.334
8.034
8.748
9.475
59.1
GROWTH NET
0.0
0.616
0.644
0.673
0.703
0.735
0.768
0.803
0.53^
5.8
INVESTMENT
1.151
1.151
1.151
1.151
1.151
1.151
1.151
1.151
1.151 '
10.4
MINIMUM COST
REPLACEMENT
0.234
0.224
0.403
0.494
0.586
0.681
0.777
0.874
0.974
5.2
(MOST EFFICIENT
REQUIREMENT
13.695
14.311
14.955
15.628
16.332
17.066
17.834
18.637
19.476
REGION)
CAPITALIZATION
4.490
6.257
8.051
9.875
11.729
13.614
15.533
17.486
19.476
INTEREST
0.346
0.482
0.620
0.760
0.903
1.048
1.196
1.346
1.500
8.2
OPERATIONS
0.280
0.390
0.502
0.616
0.849
0.969
1.090
1.214
6.6
CASH RQMTS
2.001
2.S63
3.319
3.694
4.075
4.464
4.860
5.264
5.677
36.2
-------
— • • • . — 1 nun- ^ . •
PROJECTED EXPFNDITURFS IN Mil LIONS OF 1967 DOLLARS
SIC — >
265 < —
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
e/i
CO YEAR
COJ968
1969
1970
1971
1972
1973
1974
1975
JL976
TOJAJL..
YEAR
1968
1969
1970
19 7J
1972
1973
1974
197S
1976
GROWTH
0.0
0.808
0.846
0.885
0.926
0.968
1.013
1.060
1.109
7.6
GROWTH
0.0
0.851
0.890
0.931
0.974
1.019
1.066
1.115
1.166
8.0
GROWTH
0.0
0.600
0.628
0.657
0.687
0.719
0.752
0.787
0.823
NET INVESTMENT
1.947
1.947
1.947
1.947
.947
.947
.947
.947
.947
17.5
NET INVESTMENT
2.048
2.048
2.048
2.048
2.048
2.048
2.048
2.048
2.048
18.4
NET INVESTMENT
1.445
1.445
1.445
1.445
1.445
1.445
1.445
1.445
1.445
REPLACEMENT
0.097
0.097
0.375
0.516
0.660
0.806
0.9b4
1.104
1.257
5.9
MAXIMUM COST
REPLACEMENT
0.102
0.102
0.394
0.543
0.694
0.848
1.003
1.161
1.322
6.2
MINIMUM COST
REPLACEMENT
0.072
0.072
0.278
0.383
0.490
0.598
0.708
0.819
0.933
REQUIREMENT
17.519
18.327
19.173
20.058
20.984
21.952
22.965
24.025
25.133
CAPITALIZATION
1.947
4.702
7.494
10.325
13.197
16.112
19.072
22.078
25.133
INTEREST
0.150
0.362
0.577
0.795
1.016
1.241
1.469
1.700
1.935
9.2
OPERATIONS
0.098
0.237
0.377
0.520
0.664
0.811
0.960
1.112
1.265
6.0
CASH RQMTS
2.292
3.451
4.121
4.662
5.213
5.772
6.342
6.922
7.512
46.3
(1968 EFFICIENCY)
REQUIREMENT
18.431
19.282
20.171
21.10?
22.076
23.095
24.160
25.275
26.442
(MOST EFFICIENT
REQUIREMENT
13.003
13.603
14.231
14.887
15.574
16.293
17.045
17.832
18.654
CAPITALIZATION
2.048
4.946
7.884
10.863
13.884
16.951
20.065
23.227
26.442
REGION)
CAPITALIZATION
1.445
3.490
5.562
7.664
9.795
11.959
14.155
.... .16.387
18.654
INTEREST
0.158
0.381
0.607
0.836
1.069
1.305
1.545
1.789
2.036
9.7
INTEREST
0.111
0.269
0.428
0.590
0.754
0.921
1.090
1.262
1.436
OPERATIONS
0.105
0.255
0.406
0.559
0.715
0.873
1.033
1.196
1.361
6.5
OPERATIONS
0.067
0.161
0.257
0.354
0.452
0.552
0.653
0.756
0.861
CASH RQMTS
2.413
3.636
4.345
4.918
5.500
6.092
6.695
7.309
7.934
48.8
CASH RQMTS
1.695
2.547
3.036
3.428
3.828
4.234
4.648
5.069
5.498
TOTAL
5.7
13.0
4.4
6.9
4.1
34.0
-------
TARI F
S I C — >
?66 < —
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
GROWTH
0.0
-1.101
-1.051
-0.958
-0.915
-0.874
-0.834
-0.797
-7.5
NET INVESTMENT
2.235
2.235
2.235
2.235
2.235
2.235
2.235
2.235
2.235
20.1
REPLACEMENT
0.324
0.324
0.440
0.502
0.565
0.631
0.700
0.770
0.842
5.1
MAXIMUM COST
REQUIREMENT
24.366
23.265
22.214
21.210
20.251
19.336
18.462
17.628
16.831
CAPITALIZATION
6.482
7.617
8.801
10.033
11.309
12.630
13.991
15.393
16.831
INTEREST
0.499
0.586
0.678
0.773
0.671
0.972
1.077
1.185
1.296
7.9
OPERATIONS
0.341
0.400
0.462
0.527
0.594
0.663
0.735
0.809
0.884
5.4
CASH RQMTS
3.399
2.445
2.764
3.033
3.307
3.588
3.874
4.165
4.461
31.0
(1968 EFFICIENCY)
W~
§1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
YEAS
1963
1969
1970
1971
1972 "
1973
1974
1975
1976
GROWTH
0.0
-1.333
- .273
- .215
- .160
- .108
- .058
- .010
-0.964
-9.1
GROWTH
0.0
-0.674
-0.644
-0.615
-0.587~
-0.560
-0.535
-0.511
-0.488
NET INVESTMENT
2.805
2.805
2.805
2.805
2.805
2.805
2.805
2.805
2.805
25.2
NET INVESTMENT
1.186
1.1 86
1.186
1.186
1.186
1.186
1.186
1.186
1.1H6
REPLACEMENT
0.353
0.503
0.582
0.665
0.749
0.837
0.927
1.019
6.0
MINIMUM COST
REPLACEMENT
6.2T2
0.272
•" 0.324 ""
0.353
0.383
0.414
6.447
0.480
••' " ' O.ST5 '"
REQUIREMENT
29.494
28.161
26.889
25.673
24.513
23.406
22.348
21.338
20.374
(MOST EFFICIENT
REQUIREMENT
14.919
14.245
13.601
12.986
12.400
11.839
11.304
10.793
10.306
CAPITALIZATION
7.052
8.525
10.057
11.647
13.292
14.990
16.737
18.533
20.374
REGION)
CAPITALIZATION
5.433
5.944
6.486
7.058
7.656
8.282
8.933
9.608
10.306
INTEREST
0.543
0.656
0.774
0.897
1.024
1.154
1.289
1.427
1.569
9.3
INTEREST
0.418
0.458
0.499
0.543
0.590
0.638
0.68~8
0.740
0.794
OPERATIONS
0.410
0.496
0.585
0.677
0.773
0.872
0.973
1.078
1.185
7.0
OPERATIONS
0.240
0.263
0.287
0.312
0.338
0.366
0.395
0.424
0.455
CASH RQMTS
4.111
2.977
3.395
3.747
4,106
4.473
4.846
5.227
5.613
38.5
CASH RQMTS
2.116
1.504
1.652
1.779
1.909
2.043
2. ISO
2.319
2.462
TOTAL
-4.6
10.7
3.5
18.0
-------
TABLE .
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
.S.I C —> ?812
PRORARLt COST (MEDIAN EFFICIENCY)
YEAR
196*
1969
1970
197)
197?
1973
1974
1975
' 1976
TOTA'C
1968
1969
1970
1971
197?
1973
1974
197S
1976
TOTAL
GROWTH
0.0
-0_j50J_
-0.481
-0.462
-0.444
-0.4?6
-0.4Q9
-0.392
-0.377
-3.5
NhT INVESTMENT RF
-0.158
-0.158
-0.158
-0.158
-0.158
-0.158
-0.158
-0.158
-1.4
0.69Q
0.690
0.62b
0.594
O.S64
0.534
0.506
0.478
0.452
5.1
1^.025
11.543
10.638
10.21?
9.803
9.034
CAPITALIZATION
13.792
12.493
11.872
11.271
10.120
9.569
9.034
INTEREST
1.062
l.flJLl
0.962
.0,9.14....
0.868
0.823
0.779
0.737
0.696
OPERATIONS
2.104
2^0.3.
1.906
1.811
1.719
L.63.0
1.544
1.460
1.378
CASH RQMTS
3.697
3.045
1.991
7.9
15.6
23.6
MAXIMUM COST (1968 EFFICIENCY)
GROWTH NET INVESTMENT REPLACEMENT
0.0 0.4Q5 Q.718
-0.704
-0.676
-0.623
-0.598
-0.574
-0.551
0.405
0.405
0.405
0.405
0.405
0.405
0.405
0.405
0.718
0.689
0.677
0 .666
0.656
0.648
0.641
0.634
REQUIREMENT CAPITALIZATION INTEREST OPERATIONS
17.593 14.355 1.105 2.510
16.889
16.213
15.564
14.941
14.343
13.769
13.218
12.689
14.055
13.784
13.540
13.322
13.129
.. . .1.2,959 ._
12.813
12,689
1.082
1.0.61
1.043
_ 1.026 .
1.011
_ 0,998 . ....
0.987
... 0,9.77
2.457
2.367
2.329
2.295
2.266
2.240
..... 2.21.9
CASH RQMTS
-------
JLABLE.. . ._
PRQJ£CTEB_£X.P£NPITLIR£5 IJJ_M1LL.IQNS_ OF 1967 DOLLARS
. -S. JL. C. r->_..
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1970
1971
1972
1973
1974
1975
1976
TOTAL
GROWTH NET
0.0
0.657
0.674
0.691
0.70
-------
-- -- - -- ----- - — . . ... _ ._ . 1 HL?UJ-
PROJKCTb'O EXPFNDI TtlRES IN Ml
S
I C — > 2H1S < —
1 LIiNS '>F iff. 7 nni i flR<;
•
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
tit
Jo YEAR
Qa_l<568
1969
1970
1971
1972.
1973
1974
1975
1976
TOTAL..
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH
0.0
0.015
0.015
0.015
0.015
0.016
0.016
0.016
0.016
0.1
GROWTH
0.0
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.1
GROWTH
0.0
0.012
0.012
0.012
0.012
0.012
0.012
0_.012
0.012
NET INVESTMENT
-4.989
-4.989
-4.989
-4.989
-4.989
-4.989
-4.989
-4.989
-4.989
-44.9
NET INVESTMENT
-4.942
-4.942
-4.942
-4.942
-4.942
-4.942
-4.942
-4.942
-4.942
-44.5
NET INVESTMENT
-5.429
-5.429
-5.429
-5.429
-5.429
-5.429
-5.429
-5.429
-5.429
REPLACEMENT
2.785
2.785
2.287
2.038
1.790
1.541
1.292
1.044
0.795
16.4
MAXIMUM COST
REPLACEMENT
2.787
2.787
2.294
2.048
1.802
1.555
1.309
1.063
0.816
16.5
MINIMUM COST
REPLACEMENT
2.763
2.763
2.221
1.950
1.679
1.408
1.137
0.867
0.596
RFQUIREMENT
15.775
15.790
15.806
15.8?1
15.837
15.852
15.868
15.883
15,899
CAPITALIZATION
55.691
50.717
45.743
40.769
35.795
30.821
25.847
20.873
15.899
INTEREST
4.288
3.905
3.522
3.139
2.756
2.373
1.990
1.607
1.224
24.8
OPERATIONS
3.107
2.829
2.552
2.274
1.997
1.719
1.442
1.164
0.887
18.0
CASH RQMTS
5.190
4.545
3.387
2.478
1.569
0.660
-0.250
-1.159
-2.068
14.4
(1968 EFFICIENCY)
REQUIREMENT
16.202
16.218
16.234
16.250
16.266
16.281
16.297
16.313
16.329
(MOST EFFICIENT
REQUIREMENT
11.820
11.832
11.843
11.855
11.866
11.878
11.890
11.901
11.913
CAPITALIZATION
55.738
50.812
45.886
40.960
36.034
31.107
26.181
21.255
16.329
REGION)
CAPITALIZATION
55.251
49.834
44.416
38.999
33.582
28.165
22.747
17.330
11.913
INTEREST
4.292
3.913
3.533
3.154
2.775
2.395
2.016
1.637
1.257
25.0
INTEREST
4.254
3.837
3.420
3.003
2.586
2.169
1.752
1.334
0.917
OPERATIONS
3.120
2.844
2.569
2.293
2.017
1.741
1.466
1.190
0.914
18.2
OPERATIONS
2.861
2.580
2.300
2.019
1.739
1.458
1.178
0.897
0.617
CASH RQMTS
5.257
4.618
3.470
2.569
1.667
0.766
-0.135
-1.037
-1.938
15.2
CASH RQMTS
4.449
3.763
2.523
1.555
0.586
-0.382
-1.351
-2.319
-3.287
TOTAL
0.1
-48.9
15.4
23.3
15.6
5.5
-------
TABLE
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S I C --> 28_16_
196R
.J9.69-..-
1970
1971
1972
1973.
1974
.1975_
1976
TOTAL
Ml
_
1969
1970
1971
1973
T973
1974
197S
TOTAL
YEAR
1968
1969
1976
1971
1972 "
1973
1974
1975
1976
TOTAL
PROBABLE COST (MEDIAN EFFICIENCY)
GROWTH NET
0.0
0.321
0.329
0.337
0.346
0.355
0.364
0.373
0.383
2.8
INVESTMENT
0.634
0.634
0.634
0.634
0.634
0.634
0.634
0.634
0.634
5.7
REPLACEMENT
0.374
0.374
0.470
0.519
0.568
0.617
0.667
0.717
0.768
5.1
MAXIMUM COST
REQUIREMENT
12.552
12.873
13.202
13.539
13.885
14.240
14.603
14.977
15.359
CAPITALIZATION
7.483
8.437
9.400
10.371
11.350
12.339
13.336
14.343
15.359
INTEREST
0.576
0.650
0.724
0.799
0.874
0.950
1.027
1.104
1.183
7.9
OPERATIONS
1.062
1.198
1.334
1.472
1.611
1.753
1.893
2.036
2.181
14.5
CASH RQMTS
2.646
3.176
3.491
3.760
4.032
4.307
4.584
4.865
5.147
36.0
(1968 EFFICIENCY)
GROWTH NET
0.0
0.335
0.344
0.352
0.361
0.371
0.380
0.390
0.400
2.9
GROWTH NET
0.0
0.181
0. ]5"5
0.190
"" " "0.195
0.200
0.205
0.210
0.215
INVESTMENT
0.696
0.696
0.696
0.696
0.696
0.696
0.696
0.696
0.696
6.3
INVESTMENT
0.024
0.024
0.0?4
0.024
0.024
0.024
0.0?4
0.0?4
0.024
REPLACEMENT
0.377
0.377
0.481
0.533
0.586
0.639
0.693
0.747
0.802
5.2
MINIMUM COST
REPLACEMENT
0.344
0.344
0.364
0.375
0.386
0.397
0.409
0.420
6.432
REQUIREMENT
13.110
13.445
13.788
14.141
14.502
14.873
15.253
15.64?
16.042
(MOST EFFICIENT
REQUIREMENT
7.065
7.246
7.431
7.620
7.815
8.015
A. 220
8.430
8 . 645
CAPITALIZATION
7.545
8.575
9.614
10.662
11.719
12.786
13.861
14.947
16.042
REGION)
CAPITALIZATION
6.873
7.078
?!500
7.719
7.943
8.172
8.406
8.645
INTEREST
0.581
0.660
0.740
0.821
0.902
0.984
1.067
1.151
1.235
8.1
INTEREST
0.529
0.545
0.561
0.578
0.594
0.612
0.629
0.647
0 .666
C t.
OPERATIONS
1.093
1.242
1.393
1.544
1.698
1.852
2.008
2.165
2.324
15.3
OPERATIONS
0.791
0.814
O.S39
0.863
0.888
0.914
0.940
0.967
0.995
O rt
CASH RQMTS
2.747
3.310
3.653
3.947
4.243
4.542
4.844
5.149
5.456
37.9
CASH RQMTS
1.688
1.908
1.973
2.030
2.087
2.146
2.207
2.269 .
2.332
in f
1.6
3.5
-------
CD
w
- PROJECTED FXPFNDTTIIRFS TN Mill IONS OF 1967 DOLLARS
- S.I C — > 2818
<-—
PROBABLE COST (MEDIAN EFFICIENCY)
IAR GROWTH NET
>68 o'.O
>69 15.904
>70 16.625
)71 17.380
572 18.168
573 18.993
574 19.854
575 20.755
576 21.697
XTAL 149.4
:AR GROWTH NET
56« 0.0
569 8.032
570 8.396
571 8.777
372 9.176
573 9.592
374 10.027
575 10.482
376 10.958
1TAL 75.4
^AR . GROWTH NET_
368 0.0
569 to. 179
370 6.460
371 6.753
372 7.054
373 7.380
374 7.714
375 8.064_
376 8.430
INVESTMENT
20.363
20.263
20.263
2JK263
20.?63
20.263
20.2t>3
20.263
20.263
182.4
INVESTMENT
0.986
0.986
0.986
0.986
0.986
0.986
0.986
0.986
0.986
8.9
INVESTMENT
-3.551
-3.551
-3.551
-3.551
-3.551
-3.551
-3.551
-3.551
-3.551
REPLACEMENT
9.420
9.420
13.073
J.4,,955
16.077
_ .... 18.840
20.846
22.896
24.994
151.3
MAXIMUM COST
REPLACEMENT
8.457
8.457
9.377
9.865
1Q.373
10.902
11.452
12.026
L2_.623
93.5
MINIMUM COST
REPLACEMENT
8.230
8.230
8.507
8.667
8.842
9.034
9.242
9.46R
9.711
REQUIREMENT
350.513
366.417
383.042
40JL.42Z.
418.590
437.583
457.438
478.193 '
499.890
CAPITALIZATION
188.410
224.577
261.465
299.108
337.539
376.794
416.912
457._9M
499.890
INTEREST
14.508
17.292
20.133
23.031
25.990
29.013
32.102
35.261
38.492
235.8
OPERATIONS
14.298
17.043
19.842
22.699
25.615
28.594
31.639
. __3A..7.52-
37.936
232.4
CASH RQMTS
58.489
79.922
89.937
98.328
106.914
115.703
124.704
133.927
143.382
951.3
(1968 EFFICIENCY)
REQUIREMENT
177.021
185.053
193.449
202.227
2JLL.4a2
220.994
231.022
241.504
252.461
(MOST EFFICIENT
REQUIREMENT
136.190
142.369
148.829
155.582
162.641
170.021
177.735
185. 79Q
194.230
CAPITALIZATION
169.133
178.151
187.533
197.297
2Q7.458
218.036
229.050
240.518
252.461
REGION)
CAPITALIZATION
164.596
167.225
170.134
1 73. 336
176.844
180.673
184.837
189.3_5J)
194.230
INTEREST
13.023
13.718
14.440
15.192
J5.974
16.789
17.637
18.520
_. 19..44Q,
J44.7
INTEREST
12.674
12.876
13.100
13.347
13.617
13.912
14.232
14.580
14.956
OPERATIONS
61.161
64.422
67.814
71.345
75.02.0
78.845
82.027
86.974
91.293
679.7
OPERATIONS
12.627
12.829
13.052
13.298
13.567
13.861
14.180
14.526
14.901
CASH RQMTS
83.626
95.614
101.014
106.165
111.528
117.113
122.930
128.988
135.300
1002.3
CASH RQMTS
29.980
36.564
37.568
38.513
39.534
40.635
41.818
J»3.Q87
44.447
TOTAL
58.0
-32.0
79.9
123.3
122.8
352.1
-------
TABLE.
TEA?
1968
1969
1970
1972
1973
1974
j_975_
1976
TOf AL
TOTAL
YF.AP
1968
" 1970
1971
1972
1973
1974
1975
1976
!._. ^ j*-arj..^i_T-.A£ ^/i- i_ii^A-j_-WT.^w^ i'l | | ,1,1. in,,,* ^"^J Vf 1 7Wf kf*JUt»nn,?
5 I C --> 2819 < —
PROBABLE COST (MEDIAN EFFICIENCY)
GROWTH
0.0
2.801
2.906
3.015
3.127
3.244
3.365
3.491
3.622
25.6
GROlTH
0.0
3.868
4.013
4.163
4.318
4 . 48"0
4.647
4.821
5.001
35.3
GROWTH
0.0
1.530
1.587
1 .646
1.708
1.772
1 . 838
1.906
1.978
NET INVESTMENT
4.239
4.239
4.239
4.239
4.239
4.239
4.239
4.239
4.239
38.1
NET INVESTMENT
7.410
7.410
7.410
7.410
7.410
7.410
7.410
7.410
7.410
66.7
NET INVESTMENT
0.458
0.458
0.458
0.458
0.458
0.458
0.458
0.458
0.458"
REPLACEMENT
2.052
2.052
2.761
3.124
3.492
3.867
4.247
4.633
5.026
31.3
MAXIMUM COST
REPLACEMENT
2.211
2.211
3.346
3.924
4.511
"5.105"
5.708
6.320
6.940
40.3
MINIMUM COST
REPLACEMENT
1.863
1.863
2.065
2.170
2.278
2.390
2.505
2.623
2.745
REQUIREMENT
74.953
77.754
80.660
83.675
86.802
90.047
93.412
96.904
100.525
CAPITALIZATION
41.042
48.082
55.227
62.481
69.847
77.330
84.934
92.665
100.525
INTEREST
3.160
3.702
4.252
4.811
5.378
5.954
6.540
7.135
7.740
48.7
OPERATIONS
5.885
6.894
7.919
8.959
10.015
11.088
12.178
13.287
14.414
90.6
CASH RQMTS
15.336
19.689
22.077
24.147
26.252
28.392
30.569
32.785
35.041
234.3
(1968 EFFICIENCY)
REQUIREMENT"
103.496
"1077364
111.377
115.540
119.858
124.338
128.985
133.806
138.806
(MOST EFFICIENT
REQUIREMENT
40.928
42.458
44.045
45.691
47.398
49.170
51.008
52.914
54.89?
CAPlTALlZ'ATfON
44.213
— -5SV492
66.915
78.488
90.217
102.107
114.164
126.395
138.806
REGION)
CAPITALIZATION
37.261
39.249
41.295
43.399
45.565
47.795
50.091
52.456
54.892
" TNTE'REST "
3.404
4.273
5.152
6.044
6.947
7.862
8.791
9.732
10.688
62.9
INTEREST
2.869"
3.022
3.180
3.342
3.509
3.680
"3.857
4.039
" 4.227
"* t -I
OPERATIONS
7.355
9.231
11.131
13.056
15.007
16.985
18.991
21.025
23.090
135.9
OPERATIONS
"4.378
4.612
4.852
5.099
5.354
5.616
5.886
6.163
6.450
A O J.
CASH RQMTS
20.380
26.993
31.052
34.597
38.193
41.842
45.547
49.308
53.129
341.0
CASH RQMTS
9.569
11.485
12.142
12.716
13.307
13.916
14.543
15.190
15/857
14.0
4.1
-------
SIC —> 2*2
.TABLE.
_PROJECTED EXPENDITURES IN MILLIONS OF 1967 OOLLAK
YEAR
1969
'1970
1971
197?
1973
1974
1975
1976
TOTAL
•JL1968
1969
1970
1971
1972
1973
1974
1975
1976 _
TOTAL
YE AW
1963
1969
1970 "
1971
'1972
1973
1974
1975
1976
TOTAL
GROWTH
" o.'o
10.981
11.480
12.003
12.549
13.120
13.71o
14.340
14.993
103.2
NET INVESTMENT
2.238
2.238
2.238
2.238
2.238
2.238
2.238
2.238
2.238
20.1
PROBABLE COST
REPLACEMENT
11.175
11.175
12.522
13.234
13.973
14.741
15.539
16.368
17.229
126.0
MAXIMUM COST
(MEDIAN EFFICIENCY)
REQUIREMENT
241.404
252.385
263.865
275.86ft
288.417
301.536
315.253
329.593
344.585
CAPITALIZATION
223.498
236.717
250.436
264.677
279.464
294.822
310.776
327.355
344.585
INTEREST
17.209
18.227
19.284
2Q.38_0_
22!701
23.930
25.206
26.533
195.0
OPERATIONS
9.163
9.705
10.267
10.851
11.457
12.087
12.741
13.421
14.127
103.8
CASH RQMTS
39.785
52.326
55.791
58.706
61.736
64.887
68.164
71.573
75.120
548.1
(1968 EFFICIENCY)
GROWTH
0.0
14.860
15.536
16.242
16.98.1
17.754
18.561
19.405
20.288
139.6
NET INVESTMENT
11.712
11.712
11.712
11.712
11.712
11.712
11.712
105.4
REPLACEMENT
i 1.649
11.649
14.340
15.737
17.172
18.645
20.159
21.715
23.315
154.4
REQUIREMENT
326.672
341.532
357.067
373.310
390. 29J
408.044
426.605
446.011
466.299
CAPITALIZATION
232.972
259.545
286.793
314.747
343.44JL
372.907
403.180
434.298
466.299
INTEREST
17.939
19.985
22.083
24.236
26.445
28.714
31.045
33.441
35.905
239.8
OPERATIONS
11.178
12.453
13.761
15.102
16.479
17.892
19.345
20.838
22.373
149.4
CASH RQMTS
52.478
70.659
77.431
83.029
88.789
94.7)8
100.822
107.112
113.594
788.6
GROWTH
0.0
6.965
7.28?
7.613
7.959
8.321
' 8 . 700
9.095
9.509
NET INVESTMENT
-7.572
-7.572
-7.572
-7.572
-7.572
-7.572
-7.572
-7.572
-7.572
MINIMUM COST
REPLACEMENT
10.684
10.684
10.639
10.642
10.661
10.698
10.7S5
10.831
10.928
(MOST EFFICIENT
REQUIREMENT
153.111
160.076
167.357
174.970
182.929
191.250
199.950
209.045
218.554
REGION)
CAPITALIZATION
213.688
213.080
212.790
212. B31
213.217
213.966
215.094
216.617
218.554
INTEREST
16.454
16.407
16.385
16.388
16.418
16.475
16.562
16.680
16.829
OPERATIONS
7.764
7.742
7.731
7.733
7.747
7.774
7.815
7.870
7.941
CASH RQMTS
27.330
34.226
34.465
34.803
35.212
35.697
36.259
36.904
37.634
65.4
-68.1
96.5
148.6
70.1
312.5
-------
TABLE
.. 1 967_._D.QLJ- ARS
S I C —>
PROBABLE COST (MEDIAN EFFTciENCY)
YFA*
1968
1970
1971
1972
1973
197*
1975
1976
TOTAL
GROWTH
0.0
0.079
0.079
0.079
0.079
0.080
o.oso
0.080 .
0.080
MtT INVESTMENT
2.278
2.278
3.278
2.27B
2.278
2.27S
2.279
2.278
2.278
. . REPLACEMENT REQUIREMENT CAPITALIZATION INTEREST OPES
0.535
0.535
0.771
0.889
1.007
1.124
1.242
1.360
1.478
28.925
29.004
29.083
.29.162
29.241
29._321_
39.401
29.481
29.561
10.705
13.061
15.417
17.774
20.131
22.488
24.846
27.203
29.561
0.824
1.006
1.187
1.369
1.550
1.732
1.913
2.095
2.276
IATIONS
0.514
0.628
0.741
0.854
0.967
1.081
1.194
1.307
1.421
CASH RQMTS
4.151
4.525
5.055
5.468
5.881
6.294
6.7n7
7.120
7.533
0.6
20.5
8.9
14.0
MAXIMUM COST (1968 EFFICIENCY)
8.7
52.7
2 YEAR
00 1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH NET INVESTMENT REPLACEMENT
0.0 2.531 0.548
0.085
0.085
0.085
0.086
0.086
0.086
0.08b
0.087
2.531
2.531
2.531
2.531
2.531
2.531
2.531
2.531
0.548
0.810
0.940
1.071
1.202
1.333
1.464
1.595
REQUIREMENT CAPITALIZATION INTEREST
31.208 10.958 0.844
31.293
31.378
31.464
31.549
31.635
31.721
31.808
31.894
13.574
16.191
18.807
21.424
24.041
26.659
29.276
31.894
1.045
1.247
1.448
1.650
1.851
2.053
2.254
2.456
OPERATIONS
0.537
0.665
0.793
0.921
1.049
1.177
1.305
1.433
1.562
CASH RQMTS
4.459
4.874
5.465
5.926
6.387
6.847
7.308
7.769
8.230
TOTAL
0.7
22.8
9.5
14.8
9.4
57.3
"MINIMUM COST (MOST EFFICIENT REGION)
YEAR
1968
1969
~197
-------
TABLE
PROJECTED EXPENDITURES INI MILLIONS OF 1967 DOLLARS
_S I C --> 284
PROBABLE COST (MEDIAN EFFICIENCY)
YFAR
1968
1.^9. .
1970
1971
1972
1973
1974
.1975
1976
TOTAL
GROWTH
0.0
0.021
0.021
_. ._ 0.021
0.022
0.022
0.022
0.022
0.022
0.2
NET INVESTMENT
0.281
0.281
0.281
0.281
0.281
0.281
0.281
0.281
0.281
2.5
REPLACEMENT
0.039
0.039
0.069
0.084
0.099
0.114
0.129
0.144
0.160
Oi9
REQUIREMENT
3.017
3.038
3.059
3.081
3.102
3.124
3.146
3.160
3.190
CAPITALIZATION
0.772
1.073
1.375
1.677
1.980
2.282
2.585
2.887
3.190
INTEREST
0.059
0.083
0.106
0.129
0.152
0.176
0.199
0.222
0.246
1.4
OPERATIONS
0.112
0.156
0.200
0.244
0.287
0.331
0.375
0.419
0.463
2.6
CASH RQMTS
0.491
0.579
0.676
0.759
0.841
0.923
1.006
1.089
1.171
7.5
MAXIMUM COST (1968 EFFICIENCY)
1968
1969
1970
1971
1972
1973
1974
1975
TOTAL
GROWTH NET
0.0
0.022
0.022
0.023
0.023
0.023
0.023
0.023
0.023
INVESTMENT REPLACEMENT REQUIREMENT CAPITALIZATION
0.298 0.039 3.177 0.789
0.?98
0.298
0.298
0.298
0.298
0.298
0.298
0.298
0.039
0.072
0.088
0.104
0.120
0.136
0.152
0.168
3.199
3.222
3.244
3.267
3.290
3.313
3.336
3.359
1.110
1.431
1.752
2.073
2.394
2.716
3.037
3.359
INTEREST OPERATIONS CASH RQMTS
0.061 0.119 0.517
0.085
0.110
0.135
0.160
0.184
0.209
0.234
0.259
0.167
0.215
0.264
0.312
0.360
0.409
0.457
0.505
0.613
0.718
0.807
0,896
0.986
1.075
1.164
1.254
0.2
2.7
0.9
1.4
8.0
MINIMUM COST (MOST EFFICIENT REGION)
YFAR
1968
1969
1970
1971
1972
1973
1974
1975
GROWTH
0 . 0 " "
0.013
0.013
0.013
0.014
0.014
0.014
0.014
0.014
NET__lNyEST
0.
0.
0.
0.
0.
0.
0.
0.
0.
MENT REPLACEMENT REQUIREMENT CAPITALIZATION
157
157
157
157
157
157
157
157
157
0
0
0
0
0
0
0
0
0
.032
.032
.049
.058
.066
.075
.901
.914
.928
.941
.955
.968
.083 1.982
.092 1.996
.101 2.010
0
0
0
1
1
1
1
1
.648
.818
.988
.158
.328
.498
.669
.839
.010
INTEREST OPERATIONS
0.
0.
0.
0.
0.
0.
0.
0.
0.
050
063
076
089
102
115
129
142
155
0
0
0
0
0
0
0
0
0
.081
.102
.123
.144
.166
.187
.208
.229
.251
CASH RQMTS
0.320
0.367
0.419
0.462
0.504
0.547
0.590
0.633
0.677
TOTAL
0.1
1.4
0.6
0.9
1.5
4.5
-------
- .... TABLE,
_PflQJECTED EXPENDITURES IN Mil LIONS OF 1967 00
S I C —>
PROBABLE COST (MEDIAN EFFICIENCY)
YFAP
1968
1 970
1971
1972
1973
1974
1975
1976
TOTAL
YEAR
GROWTH NET
0.0
-0.156
-0. 153
-0.151
-0.148
._ -0.146
-0.143
-0.141
-0.139
-1.2
INVESTMENT
1.024
1.024
1.024
1.024
1.024
1.024
1.024
1.024
1.024
9.2
REPLACEMENT
0.064
0.064
0.151
0.195
0.239
0.283
0.327
0.3H
0.415
2.1
REQUIREMENT
9.479
9.323
9.170
9.020
8.871
8.726
8.582
8.441
8.303
CAPITALIZATION
1.283
2.152
3.023
3.897
4.774
5.652
6.533
7.417
8.303
INTEREST
0.099
0.166
0.233
0.300
0.368
0.435
0.503
0.571
0.639
3.3
OPERATIONS
0.138
0.232
0.326
0.420
0.514
0.609
0.704
0.799
0.894
4.6
CASH RQMTS
1.326
1.330
1.581
1.789
1.997
2.205
2.415
2.624
2.835
18.1
MAXIMUM COST (1968 EFFICIENCY)
__
1969
_1_9_70
197T"
1JI72
"1973
1974
1975
i9.!6-
TOTAL
GROWTH NET INVESTMENT REPLACEMENT
0.0 1.238 0.075
-0.187
-0.184
-0.181
-0.178
-0.175
-0.172
-0.170
-0.167
1.238
1.238
1.238
1.238
1.238
1.238
1.238
1.238
0.075
0.180
0.233
0.286
0.339
0.392
0.446
0.499
REQUIREMENT CAPITALIZATION INTEREST
11.399 1.497 0.115
11.212
11.028
10.846
10.668
10.493
10.321
10.151
9.984
2.547
3.601
4.658
5.717
6.780
7.845
8.913
9.984
0.196
0.277
0.359
0.440
0.522
0.604
0.686
0.769
OPERATIONS
0.173
0.295
0.417
0.540
0.663
0.786
0.909
1.033
1.157
CASH RQMTS
1.601
1.617
1.928
2.188
2.448
2.709
2.971
3.233
3.496
-1.4
11.1
2.5
4.0
6.0
22.2
MINIMUM COST (MOST EFFICIENT REGION)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH
0.0
-0.104
-0.103
-0.101
-0.099
-0.098
-0.096
-0.094
-0.093
NET INVESTMENT
0.677
0.677
0.677
0.677
0.677
0.677
0.677
0.677
0.677
REPLACEMENT
0.047
0.047
0.104
0.133
0.162
0.191
0.220
0.249
0.278
REQUIREMENT
6.348
6.244
6.141
6.0^0
5.941
5.843
5.748
5.653
5.560
CAPITALIZATION
0.936
1.508
2.082
2.658
3.235
3.814
4.394
4.977
5.560
INTEREST
0.072
0.116
0.160
0.205
0.249
0.294
0.338
0.383
0.428
OPERATIONS
0.092
0.148
0.204
0.260
0.317
0.374
0.431
0.488
0.545
CASH RQMTS
0.887
0.883
1.042
1.174
1.305
1.437
1.569
1.702
1.835
TOTAL
-0.8
6.1
-------
• __— ——_—___ 1 MULL- _______ . '
PROJECTED EXPENDITURE?; IN Mil LIONS OF 1967 DOLLARS
S I C -->
286 < —
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1973
1973
1974
1975
1976
TOTAL
Oft
O YEAR
I-H968
1969
1970
1971
1973
1973
1974
1975
1976
TOTAL
GROWTH
0.0
-0.353
-0.332
-0.313
-0.295
-0.278
-0.261
-0.246
-0.232
-2.3
GROWTH
0.0
-0.470
-0.442
-0.417
-0.392
-0.369
-0.348
-0.328
-0.309
-3.1
NET INVESTMENT
0.364
0.364
0.364
0.364
0.364
0.364
0.364
0.364
0.364
3.3
NET INVESTMENT
0.587
0.587
0.587
0.587
0.587
0.587
0.587
0.587
0.587
5.3
REPLACEMENT
0.157
0.157
0.160
0.162
0.166
0.170
0.175
0.181
0.188
1.5
MAXIMUM COST
REPLACEMENT
0.168
0.168
0.182
0.190
0.200
0.211
0.223
0.236
0.250
1.8
REQUIREMENT
6.062
5.709
5.377
5.064
4.769
4.491
4.230
3.984
3.752
CAPITALIZATION
3.146
3.158
3.190
3.242
3.311
3.398
3.501
3.619
3.752
INTEREST
0.242
0.243
0.246
0.250
0.255
0.262
0.270
0.279
0.289
2.3
OPERATIONS
0.207
0.207
0.209
0.213
0.217
0.223
0.230
0.238
0.246
2.0
CASH RQMTS
0.971
0.619
0.647
0.676
0.708
0.741
0.777
0.815
0.855
6.8
(1968 EFFICIENCY)
REQUIREMENT
8.068
7.598
7.156
6.739
6.347
5.978
5.630
5.302
4.993
CAPITALIZATION
3.369
3.487
3.632
3.803
3.998
4.216
4.455
4.715
4.993
INTEREST
0.259
0.268
0.280
0.293
0.308
0.325
0.343
0.363
0.384
2.8
OPERATIONS
0.259
0.268
0.279
0.292
0.307
0.324
0.342
0.362
0.384
2.8
CASH RQMTS
1.274
0.823
0.885
0.946
1.010
1.077
1.147
1.221
1.297
9.7
YEAR
1968
1969
1970
1971
1973
1973
1974
1975
1976
GROWTH
0.0
-0.180
-0.169
-0.159
-0.150
-0.141
-0.133
-0.125
-0.118
NET INVESTMENT
0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034
MINIMUM COST
REPLACEMENT
0.141
0.141
0.127
0.120
0.115
0.109
0.104
0.100
0.095
(MOST EFFICIENT
REQUIREMENT
3.085
2.905
2.736
2.577
2.427
2.286
2.153
2.027
1.909
REGION)
CAPITALIZATION
2.816
2.670
2.534
2.409
2.292
2.185
2.085
1.994
1.909
INTEREST
0.217
0.206
0.195
0.185
0.177
0.168
0.161
0.154
0.147
OPERATIONS
0.164
0.156
0.148
0.141
0.134
0.127
0.122
0.116
0.111
CASH RQMTS
0.556
0.356
0.334
0.321
0.309
0.297
0.287
0.278
0.270
TOTAL
-1.2
0.3
1.1
1.6
1.2
3.0
-------
TABLE
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S I C —> 287
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR GROWTH NET INVESTMENT
1968
1969
1970
1971
1972
1973
1974
1975
1976
0.0
0.734
0.755
0.777
0.799
0.822
.732
.732
.732
.732
.732
1.732
0.845 1.732
0.869 1.732
0.894 1.732
REPLACEMENT
0.598
0.598
0.846
0.971
1.098
1.226
1.354
1.485
1.616
REQUIREMENT CAPITALIZATION
25.822
26.556
27.312
28.089
28.887
29.709
30.554
31.423
32.317
11.964
14.431
16.918
19.427
21.959
24.512
27.090
29.691
32.317
INTEREST
0.921
1.111
1.303
1.496
1.691
1.887
2.086
2.286
2.488
OPERATIONS
2.291
2.763
3.239
3.720
4.204
4.693
5.187
5.685
6.188
CASH ROMTS
5.542
6.939
7.875
8.696
9.524
10.360
11.204
12.057
12.918
TOTAL
6.5
15.6 9.8
15.3 38.0 85.1
MAXIMUM COST (1968 EFFICIENCY)
GROWTH NET
0.0
0.965
0.993
1.021
1.050
1.080
1.111
1.142
1.175
INVESTMENT
2.634
2.634
2.634
2.634
2.634
2.634
2.634
2.634
2.634
REPLACEMENT
0.643
0.643
1.005
1.187
1.372
1.557
1.745
1.933
2.124
REQUIREMENT CAPITALIZATION
33.939 12.866
34.904
35.897
36.918
37.968
39.048
40.159
41.301
42.475
16.466
20.092
23.747
27.432
31.146
34.890
38.667
42.475
INTEREST
0.991
1.268
1.547
1.829
2.112
2.398
2.687
2.977
3.271
OPERATIONS
2.877
3.681
4.492
5.309
6.133
6.963
7.801
8.645
9.497
CASH RQMTS
7.145
9.192
10.671
11.980
13.301
14.633
15.976
17.332
18.700
TOTAL
YEAR
1968
1969
1970
1971
197?
1973
1974
1975
1976
TOTAL
8.5
23.7
12.2
19.1
55.4
118.9
GROWTH
0.0
0.506
0.521
0.535
0.551
0.566
0.582
0.599
0.61t>
NET INVESTMENT
0.840
0.840
0.840
0.840
0.840
O.«40
0.840
0.840
0.840
MINIMUM COST
REPLACEMENT
0.554
0.554
0.689
0.758
0.827
0.898
0.969
1.041
1.114
(MOST EFFICIENT REGION)
REQUIREMENT
17.796
18.302
18.823
19.358
19.909
20.475
21.057
21.656
22.272
CAPITALIZATION
11.072
12.419
13.780
15.156
16.547
17.954
19.376
20.816
22.272
INTEREST
0.853
0.956
1.061
1.167
1.274
1.382
1.492
1.603
1.715
i •* rr
OPERATIONS
1.783
1.999
2.218
2.440
2.664
2.890
3.119
3.351
3.586
*•»/. *
CASH RQMTS
4.029
4.856
5.330
5.741
6.156
6.577
7.003
7.434
7.871
4.5
7.6
7.4
-------
YFAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
' YEAR
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
s i c -->
_*»? - ..-<=.-
PROJECTED EXF
•ENPITURES IN MILLIONS OF 1967 DOLLARS ...... .
-
PROBABLE COST (MEDIAN EFFICIENCY)
GROWTH
0.0
14.774
18.355
22.804
38.331
35. 198
54.323
67.497"
285.0"
GROWTH
0.0
17.262
21.471
26.675
33.141
41.173
51. 153
63.552
78.956
333.4
GROWTH
0.0
7.763
9.645
1 1.983
14.887
18.496
22.979
28.548
35.468
NET INVESTMENT
5.258
5.?5ft
5.258
5.258
5.258
5.258
5.?5fl
5.P58
5.258
47.3
NET INVESTMENT
6.408
6.408
6.408
6.408
6.408
6.408
6.408
6.408
6.408
57.7
NET INVESTMENT
2.044
2.044
2.044
2.044
2.044
2.044
2.044
2.044
2.044
REPLACEMENT
0.944
0.944
3.127
4.530
6.209"
8.232
10.681
13.661
17.298
65.6
MAXIMUM COST
REPLACEMENT
1.002
1.002
3.580
5.234
7.212
9.591
1?.469
1S.V67
20.235
76.3
MINIMUM COST
REPLACEMENT
0.764
0.784
1.859
2.560
3.406
4.433
5.685
7.214
9.09Q
REQUIREMENT
60.95?
75.726
94.081
116.884
145.215
180.413
224.14?
278.470
345.967
CAPITALIZATION
18.887
38.919
62.532
90.594
124.183
164.638
213.626
273.212
345.967
INTEREST
1.454
2.997
4.815
6.976
9.562
12.677
16.449
21.037
26.639
102.6
OPERATIONS
2.542
5.238
8.417
12.194
16.715
22.160
28.754
36.774
46.566
179.4
CASH RQMTS
10.199
29.211
39.971
51.761
66.075
83.525
104.871
131.058
163.259
679.9
(1968 EFFICIENCY)
HEOUIREMENT
71.300
88.582
110.053
136.728
169.869
211.042
262.195
325.747
404.703
(MOST EFFICIENT
REQUIREMENT
32.029
39.79?
49.437
61.420
76.307
94.803
117.782
146.330
181.798
CAPITALIZATION
20.037
43.727
71.606
104.688
144.237
191.818
249.379
319.339
404.703
REGION)
CAPITALIZATION
15.673
25.481
37.171
51.198
68.130
88.670
113.693
144.286
181.798
INTEREST
1.543
3.367
5.514
8.061
11.106
14.770
24.589
31.162
119.3
INTEREST
1.207
1.962
2.862
3.942
5.246
6.828
8.754
11.110
13.998
OPERATIONS
2.797
6.105
9.997
14.615
20 ,.137
26.779
34.815
44.582
56.499
216.3
OPERATIONS
1.638
2.663
3.884
5.350
7.119
9.266
11.881
15.078
18.998
CASH RQMTS
11.750
34.163
46.969
60.994
78.003
98.721
124.047
155.098
193.261
803.0
CASH RQMTS
5.673
15.216
20.294
25.880
32.704
41.067
51.343
63.995
79.599
149.8
18.4
35.8
55.9
75.9
335.8
-------
----- TABLE
..._PRQJ££JED. _E_X£ENDIIURtS_lJlJllLLlfl.ti5L_Q£. 1967 DOLLARS
S I C --> .J29.x;x_
YEAH
1968
1969
1970
1971
197?
1973
1974
197S
197ft
TOTAL
YEAR
1969
1970
1971
1973
1974
1975
1976
TOTAL
YFAR
1968
1969
1970
1971
1972
1^73
1974
1975
1976
TOTAL
PROBABLE COST (MEDIAN EFFICIENCY)
GROWTH NET
0.0
0.095
0.096
0.097
0.098
0.099
0.100
0.101
0.101
0.8
GROWTH NET
0.0
0 . 1 13"
0.114
0.115
0.116
0.117
0.118
0.119
0.120
0.9
GROWTH NET
o.n
0.04^
0.049
0.049
0.050
0.050
0.051
0.051
INVESTMENT
1.177
1.177
1.177
1.177
1.177
1.177
1.177
1.177
1.177
10.6
INVESTMENT
.390
.390'
.390
.390
.390
."390
.390
.390 "
.390
12.5
INVESTMENT
0.592
0.592
0.592
0.592
"0.592
0.592
0.592
0.592
0.592
REPLACEMENT
0.059
0.059
0.186
0.250
0.314
0.377
0.441
0.505
0.569
2.8
MAXIMUM COST
"" REPLACEMENT"
0.070
0.070
0.220
0.295
0.370
""0.446""
0.521
0.597
0.672
3.3
MINIMUM COST
REPLACEMENT
0.030"
0.030
0.094
0.126
O.lbS
0.190
0.22?
0.254
0.286
REQUIREMENT
10.591
10.686
10.782
10.880
10.977
11.076
11.176
11.277
11.37R
CAPITALIZATION
1.177
2.449
3.722
4.996
6.270
7.546
8.822
11.378
INTEREST
0.091
0.189
0.287
0.385
0.483
0.581
0.679
0.778
0.876
4.3
OPERATIONS
0.105
0.218
0.332
0.445
0.559
0.673
0.786
0.900
1.014
5.0
CASH RQMTS
1.431
1.738
2.077
2.354
2.630
2.906
3.183
3.460
3.737
23.5
(1968 EFFICIENCY)
REQUIREMENT
12.51?
12.625
12.738
12.853
12.969
13.085
13.203
13.32?
13.442
(MOST EFFICIENT
REQUIREMENT
S.32S
5.373
5.421
5.470
5.519
5.569
5.619
5.670
5.721
CAPITALIZATION
1.390
2.893
4.397
5.902
7.408
" " 8.915 "
10.423
11.932
13.442
REGION)
CAPITALIZATION
0.592
1.231
1.871
2.512
3.153
3.794
4.436
5.078
5.721
INTEREST
0.107
0.223
0.339
0.454
0.570
0.686
0.803
0.919
1.035
5.1
INTEREST
0.046
0.095
0.144
0.193
0.243
0.292
0.342
0.391
0.440
OPERATIONS
0.131
0.273
0.415
0.558
0.700
0.842
0.985
1.127
1.270
6.3
OPERATIONS
0.043
0.089
0.136
0.183
0.229
0.276
0.322
0.369
0.416
CASH RQMTS
1.698
2.068
2.478
2.812
3.146
3.481
3.816
4.152
4.487
28.1
CASH RQMTS
0.710
0.853
1.014
1.142
1.270
1.399
1.528
1.656
1.785
0.4
5.3
1.4
2.2
2.1
11.4
-------
YEAR
1968
1970
1971
1972
L9-73
1 974
1975
~
TOTAL
YEAR
[1968
1969
1970
1971
197?
1973
1974
1975
1976
TOTAL
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
. . __ 1 nni_LL . . — . . —
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S I C — > ?91 <—
PROBABLE COST (MEDIAN EFFICIENCY)
GROWTH NET
0.0
3.051
3.076
3.101
3.126
3.152
3.178
3.203
3.230
25.1
*
INVESTMENT
3.589
3.589
3.589
3.589
3.589
3.589
3.589
3.589
3.589
32.3
REPLACEMENT
17.283
17.283
17.949
18.283
18.619
18.956
19.294
19.634
19.975
167.3
MAXIMUM COST
REQUIREMENT
374.381
377.432
380. SOB
383.609
386.736
389.888
393.065
396.269
399.498
CAPITALIZATION
345.668
352.308
358.974
365.664
372.379
379.120
385.887
392.680
399.498
INTEREST
26.616
27.128
27.641
28.156
28.673
29.192
29.713
30.236
30.761
258.1
OPERATIONS
19.240
19.609
19.980
20.353
20.727
31.102
21.478
21.857
22.236
186.6
CASH RQMTS
66.729
70.661
72.235
73.482
74.734
75.991
77.253
78.519
79.791
669.4
(1968 EFFICIENCY)
GROWTH NET
0.0
4.339
4.375
4.410
4.446
4.483
4.519
4.556
4.593
35.7
GROWTH NET
0.0
0.92b
0.934
0.941
0.949
0.957
0.965
0.973
0.980
INVESTMENT
21.149
21.149
21.149
21.149
21.149
21.149
21.149
21.149
21.149
190.3
INVESTMENT
-25.380
-25.38Q_
-25.380
-25.380
-25.380
-25.3HO
-25.380
-35.380
-35.380
REPLACEMENT
18.161
18.161
30.713
21.990
23.270
24.551
25.835
27.120
28.407
208.2
MINIMUM COST
REPLACEMENT
15.835
15.835
13.39Q
12.168
10.946
9.7?5
8.504
7.284
6.064
REQUIREMENT
532.421
536.760
541.135
545.545
549.991
554.474
558.993
563.548
568.141
(MOST EFFICIENT
REQUIREMENT
113.657
114.583
115.517
116.459
117.408
118.365
119.329
120.302
121.382
CAPITALIZATION
363.228
388.716
414.240
439.800
465.395
491.026
516.694
542.399
568.141
REGION)
CAPITALIZATION
316.699
292.245
267.798
243,360
218.929
194.505
170.090
145.682
121.383
INTEREST
27.969
29.931
31.896
33.865
35.835
37.8Q9
39.785
41.765
43.747
322.6
INTEREST
24.386
22.503
20.620
18.739
16.858
14.977
13.097
11.218
9.339
OPERATIONS
18.355
19.643
20.933
22.225
23.518
24.813
26.110
27.409
28.710
211.7
OPERATIONS
22.308
20.586
18.864
17.142
15.421
13.701
11.981
10.262
8.543
CASH RQMTS
85.634
93.224
99.065
103.638
108.218
112.805
117.399
121.999
126.606
968.6
CASH RQMTS
37.149
34.470
28.428
23.610
18.794
13.980
9.167
4.356
-0.454
7.6
-P28.4
99.8
151.7
138.8
169.5
-------
— , _ _ . IflHI ^
PROJFCTFD FXPFMniTllRFQ iw MII i tnwc nr iat-> nnt i ADC
S I C ~>
30 < —
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
19t>8
1969
1970
1971
197J
1973
1974
1975
1976
TOTAL
GROWTH
0.0
4.037
4.233
4.439
4.656
4.882
5.120
5.369
5.630
38.4
NET INVESTMENT
8.883
8.883
8.883
8.883
8.883
8.883
8.883
8.883
8.883
79.9
REPLACEMENT
0.593
0.593
1.895
2.561
3.238
3.926
4.626
5.339
6.065
28.8
MAXIMUM COST
REQUIREMENT
82.926
86.963
91.196
95.636
100.291
105.173
110.293
115.662
121.293
CAPITALIZATION
11.862
24.782
37.898
51.221
64.759
78.524
92.527
106.779
121.293
INTEREST
0.913
1.908
2.918
3.944
4.986
6.046
7.125
8.222
9.340
45.4
OPERATIONS
0.715
1.493
2.284
3.086
3.902
4.732
5.576
6.434
7.309
35.5
CASH RQMTS
11.104
16.914
20.213
22.914
25.665
28.470
31.329
34.247
37.227
228.1
(1968 EFFICIENCY)
SYEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
YEAR
1 963'
1969
1971
1972
1973
1974
197S
1976
GROWTH
0.0
4.671
4.898
5.137
5,.387
5.649
5.924
6.212
6.515
44.4
GROWTH
0.0
1.757
1.842
1.932
2.026
2.125
2.228
2.337
2.450
NET INVESTMENT
10.330
10.330
10.330
10.330
10.330
10.330
10.330
10.330
10.330
93.0
NET INVESTMENT
3.679
3.679
3.679
3.679
3.679
3.679
3.679
3.679
REPLACEMENT
0.665
0.665
2.177
2.950
3.736
4.535
5.348
6.175
7.017
33.3
MINIMUM COST
REPLACEMENT
0.333
0.333
0.881
1.161
1.447
1.737
2.032
2.333
2.639
REQUIREMENT
95.951
100.622
105.520
110.657
116.044
121.693
127.617
133.829
140.344
(MOST EFFICIENT
REQUIREMENT
36.090
37.847
39.689
41.621
43.647
45.772
48.000
50.337
52.787
CAPITALIZATION
13.309
28.310
43.539
59.006
74.723
90.702
106.956
123.499
140.344
REGION)
CAPITALIZATION
6.658
12.094
17.615
23.226
28.931
34.735
40.642
46.658
52.787
INTEREST
1.025
2.180
3.352
4.543
5.754
6.984
8.236
9.509
10.806
52.4
INTEREST
0.513
0.931
1.356
1.788
2.228
2.675
3.129
3.593
4.065
yn . •*
OPERATIONS
0.841
1.788
2.750
3.727
4.720
5.729
6.756
7.801
8.865
43.0
OPERATIONS
0.336
0.611
0.890
1.174
1.462
1.756
2.054
2.358
2.668
TT ^
CASH RQMTS
12.861
19.635
23.508
26.688
29.927
33.228
36.594
40.028
43.534
266.0
CASH RQMTS
4.861
7.311
8.649
9.735
10.842
11.971
13.123
14.299
15.501
Q£* *J
TOTAL
16.7
33.1
12.9
-------
1 rujt-i. _ ^ — _____ , _ _
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
. .
S I C — > 31X
<--
PROBABLE COST (MEDIAN EFFICIENCY)
YEAW
1968
1970
1971
1972
1973.
1974
1976
TOTAL
0 "VFAR"
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH NET
0.0
0.222
0.229
_ 0.236
0.244
0.252
0.260
0.268
0.277
2.0
GROWTH NET
0.0
0.222
0.229
0.236
0.244
0.25?
0.260
0.268
0.277
2.Q..
GROWTH NET
0.0
0.13*
0.143
0.147
0.152
0.157
0.162
0.167
0.173
INVESTMENT
0.767
0.767
0.767
0.767
0.767
0.767
0.767
0.767
0.767
6.9
INVESTMENT
0.767
0.767
0.767
0.767
0.767
0.767
0.767
0.767
0.767
6.9
INVESTMENT
0.478
0.478
0.478
0.478
0.478
0.478
0.478
0.478
REPLACEMENT
0.038
0.038
0.138
0. 188
0.238
0.289
0.340
0.392
0.444
2.1
MAXIMUM COST
REPLACEMENT
0.038
0.038
0.138
0.188
0.233
0.289
0.340
0.392
?.l
MINIMUM COST
REPLACEMENT
0.024
0.024
0.006
0.117
0.148
0.180
0.212
0.244
0.277
REQUIREMENT
6.899
7.121
7.350
7.586
7.830
8.082
8.342
8.610
8.887
CAPITALIZATION
0.767
1.755
2.750
3.753
4.764
5.782
6.809
7.843
8.887
INTEREST
0.059
0.135
0.212
0.289
0.367
0.445
0.524
0.604
0.684
3.3
OPERATIONS
0.105
0.240
0.376
0.514
0.652
0.791
0.932
1.073
1.216
5.9
CASH RQMTS
0.969
1.402
1.721
1.993
2.267
2.544
2.823
3.104
3.388
20.2
(1968 EFFICIENCY)
REQUIREMENT
6.899
7.121
7.350
7.586
7.830
8.082
8.342
8.610
8.887
(MOST EFFICIENT
REQUIREMENT
4.301
4.439
4.582
4.729
4.881
5.038
5.200
5.368
5.540
CAPITALIZATION
0.767
1.755
2.750
3.753
4.764
5.782
6.809
7.843
8.887
REGION)
CAPITALIZATION
0.478
1.094
1.715
2.340
2.970
3.605
4.245
4.890
5.540
INTEREST
0.059
0.135
0.212
0.289
0.367
0.445
0.524
0.604
0.684
3.3
INTEREST
0.037
0.084
0.132
0.180
0.229
0.278
0.327
0.377
0.427
OPERATIONS
0.105
0.240
0.376
0.514
0.652
0.791
0.932
1.073
1.216
5.9
OPERATIONS
0.053
0.122
0.192
0.262
0.332
0.403
0.475
0.547
0.620
CASH RQMTS
0.969
1.402
1.721
1.993
2.267
2.544
2.823
3.104
3.388
20.2
CASH RQMTS
0.592
0.847
1.030
1.184
1.339
1.496
1.654
1.813
1.974
TOTAL
1.2
4.3
1.3
2.1
3.0
11.9
-------
-TABLE _.
PROJECTED EXPENDITURES TN MILLIONS 0/1967 DOjLARS
PROBABLE COST (MEDIAN EFFICIENCY)
YEA*-;
1968
1969
1970
1971
1972
1973
1974
197S.
1976
TOTAL
SYEAR
5p 1968
1969
1970
1971
1972
' 1973
1974
1975
1976
TOTAL
YEAR
1968*
1969
1970
1971
" T572 '
1973
1974
1975
1976 "
TOTAL
GROWTH
0.0
1 .885
1.939
1.975
2/022 "
2.070
2.119
2. 169
2.220
16.4
GROWTH
0.0
1.891
1.936
1.982
2.029
2.077
2.126
2.176
2.228
16.4
GROWTH
0.0
1.175
1.203
1.232
1.261
1.291
1.321
1.352
1.384
10.2
NET INVESTMENT
6.960
6.960
6.960
6.960
6.960
6.960
6.960
6.960
6.960
62.6
NET INVESTMENT
6.989
6.989
6.989
6.989
6.989
6.989
6.989
6.989
6.989
62.9
NET INVESTMENT
3.630
3.630
3.630
3.630
3.630
3.630
3.630
3.630
3.630
32.7
REPLACEMENT
1.197
1.197
2.083
2.530
2.979
3.431
3.885
4.341
4.800
26.4
MAXIMUM COST
REPLACEMENT
1.198
1.198
2.088
2.537
2.988
3.441
3.897
4.355
4.816
26.5
MINIMUM COST
REPLACEMENT
1.030
1.030
1.512
1.755
2.000
2.246
2.493
2.742
2.993
17.8
REQUIREMENT
79.616
81.501
83.430
85.405
87.427
89.497
91.616
93.785
96.005
CAPITALIZATION
23.932
32.778
41.668
50.603
59.586
68.616
77.695
86.824
96.005
INTEREST
1.843
2.524
3.208
3.896
4.588
5.283
5.983
6.685
7.392
41.4
OPERATIONS
1.006
1.378
1.752
2.127
2.505
2.885
3.266
3.650
4.036
22.6
CASH RQMTS
11.006
13.944
15.933
17.489
19.055
20.629
22.213
23.806
25.409
169.5
(1968 EFFICIENCY)
REQUIREMENT
79.877
81.768
83.704
85.685
87.714
89.790
91.916
94.092
96.320
(MOST EFFICIENT
REQUIREMENT
49.645
50.820
52.023
53.255
54.516
55.806
57.128
58.480
59.864
CAPITALIZATION
23.961
32.842
41.767
50.738
59.756
68.822
77.937
87.103
96.320
' REGION)
CAPITALIZATION
20.602
25.408
30.241
35.103
39.994
44.915
49.867
54.850
59.864
INTEREST
1.845
2.529
3.216
3.907
4.601
5.299
6.001
6.707
7.417
41.5
INTEREST
1.586
1.956
2.329
2.703
3.08Q
3.458
3.840
4.223
4.610
27.8
OPERATIONS
1.009
1.382
1.758
2.136
2.515
?.897
3.280
3.666
4.054
22.7
OPERATIONS
0.771
0.950
1.131
1.313
1.496
1.680
1.865
2.052
2.239
13.5
CASH RQMTS
11.041
13*990
15.988
17.550
19.122
20.703
22.294
23.894
25.504
170.1
CASH RQMTS
7.017
8.743
9. B05
10.633
11.466
12.305
13.150
14.000
14.857
102.0
-------
LAJ3LE
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S I C —> 321-3
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
GROWTH
0.0
-0.073
-0.073
-0.073
-0.072
-0.072
-0.072
-0.072
NET INVESTMENT
2.682
2.682
2.682
2.682
2.682
2.682
2.682
2.682
REPLACEMENT
0.^44
0.^44
0.705
0.835
0.966
1.096
1.227
1.357
REQUIREMENT
30.330
30.257
30.185
30.112
30.040
29.968
29.896
29.824
CAPITALIZATION
8.873
11.482
14.092
16.702
19.311
21.921
24.531
27.142
INTEREST
0.683
0.884
1.085
1.286
1.487
1.688
1.889
2.090
OPERATIONS
0.773
1.000
1.227
1.454
1.682
1.909
2.136
2.363
CASH RQMTS
4.582
4.937
5.626
6.185
6.744
7.303
7.862
8.421
1976
TOTAL
)968
1969
1970
1971
1972
1973
1974
1975
1976_
TOTAL
YEAk
1968
1969
1970
I97J
197?
1973
1974
1975
1976
TOTAL
-0.072
-0.6
2.682
24.1
1.488
8.6
MAXIMUM COST
29.752
29.752
2.291
13.4
2.591
15.1
8.980
60.6
(1968 EFFICIENCY)
GROWTH NET
0.0
-0.080
-0.080
-0.080
-0.080
-0.080
-0.080
-0.079
-0.079
-0.6
GROWTH NET
0.0
-0.040
-0.039
-0.039
-0.039
-0.039
-0.039
-0.039
-0.039
INVESTMENT
3.036
3.036
3.036
3.036
3.036
3.036
3.036
3.036
3.036
27.3
INVESTMENT
.142
.142
.142
.142
.142
1.142
1.142
1.142
REPLACEMENT
0.461
0.461
0.757
0.905
1.053
1.200
1.348
1.496
1.644
9.3
MINIMUM COST
REPLACEMENT
0.367
0.367
0.477
0.532
0.587
0.642
0.753
0.808
REQUIREMENT
33.515
33.435
33.354
33.274
33.194
33.115
33.035
32.956
32.877
(MOST EFFICIENT
REQUIREMENT
16.473
16.433
16.394
16.355
16.315
16.276
16.237
16.198
16.159
CAPITALIZATION
9.227
12.183
15.138
18.094
21.050
24.007
26.963
29.920
32.877
REGION)
CAPITALIZATION
7.333
8.436
9.539
10.642
11.746
12.849
13.952
15.056
16.159
INTEREST
0.710
0.938
1.166
1.393
1.621
1.849
2.076
2.304
2.532
14.6
INTEREST
0.565
0.650
0.735
0.819
0.904
0.989
1.074
1.159
1.244
OPERATIONS
0.821
1.084
1.347
1.610
1.874
2.137
2.490
2.663
2.926
16.9
OPERATIONS
0.504
0.580
0.656
0,732
0.808
0.884
0.960
1.111
CASH RQMTS
5.029
5.439
6.226
6.864
7.503
B.142
8.781
9.419
10.058
67.5
CASH RQMTS
2.578
2.699
2.971
3.187
3.403
3.619
3.835
4.051
4.267
-0.3
10.3
5.2
8.1
7.3
30.6
-------
.TABLE...._. _. ....._ _ _
_EH(Lj£CIEp__EXPE.N_P_II.URES IN MILLION?. OF 1967 DQIL.AR$
S I C_ -->__3_24
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
2 YEAR
3 1969 •
1970
1971
1972
1973"
1974
1975
1976
TOTAL
YEAR
1968
1969
1970
1971
1972
1973
19T4
1975
T976"
GROWTH NET
0.0
-0.380
-0.374
-0.368
-0.362
-0.357
-0.351
-0.346
-0.340
-2.9
GROWTH NET
0.0
-0.486
-0.478
-0.471
-0.463
-0.456
-0.449
-0.442
-0.435
-3.7
GROWTH NET
0.0
-0.182
-0.179
-0.177
-0.174
-0.171
-0.168
-0.166
-0.163
INVESTMENT
2.471
2.471
2.471
2.471
2.471
. . _. 2.471. .
2.471
2.471
2.471
22.2
INVESTMENT
3.224
3.224
3.224
3.224
3.224
3.224
3.224
3.224
3.224
29.0
INVESTMENT
1.063
1.063
1.063
1.063
1.063
1.063
1.063
1.063
1.063
REPLACEMENT
0.230
0.230
0.439
0.544
0.650
0.755
0.861
0.968
1.074
5.8
MAXIMUM COST
REPLACEMENT
0.267
0.267
0.541
0.679
0.817
0.956
1.094
1.233
1.373
7.2
MINIMUM COST
REPLACEMENT
0.159
0.159
0.247
0.29?
0.336
0.381
0.425
0.470
0.515
REQUIREMENT
24.363
23.983
23.609
23.241
22.879
22.522
22.171
21.825
21.484
CAPITALIZATION
4.591
6.683
8.780
10.884
12.993
15.107
17.228
19.353
21.484
INTEREST
0.354
0.515
0.676
0.838
1.000
1.163
1.327
1.490
1.654
9.0
OPERATIONS
0.488
0.711
0.934
1.157
1.382
1.607
1.832
2.058
2.285
12.5
CASH RQMTS
3.543
3.546
4.146
4.643
5.141
5.640
6.140
6.642
7.145
46.6
(1968 EFFICIENCY)
REQUIREMENT
31.137
30.651
30.173
29.703
29.240
28.784
28.335
27.893
27.458
(MOST EFFICIENT
REQUIREMENT
11.688
11.506
11.326
11.150
10.976
10.805
10.636
10.470
10.307
CAPITALIZATION
5.344
8.083
10.829
13.582
16.343
19.111
21.887
24.669
27.458
' REGION)
CAPITALIZATION
3.183
4.064
4.948
5.834
6.723
7.615
8.510
9.407
10.307
INTEREST
0.411
0.622
0.834
1.046
1.258
1.472
1.685
1.900
2.114
11.3
INTEREST
0.245
0.313
0.381
0.449
0.518
0.586
0.655
0.724
0.794
OPERATIONS
0.619
0.937
1.255
1.574
1.894
2.215
2.537
2.859
3.183
17.1
OPERATIONS
0.263
0.336
0.408
0.482
0.555
0.629
0.703
0.777
0.851
CASH RQMTS
4.522
4.565
5.377
6.053
6.731
7.410
8.092
8.775
9.459
61.0
CASH RQMTS
1.730
1.688
1.921
2.109
2. 298
2.488
2.676
2.869
3.060
"TOTAL
-1.4
9.6
-------
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S I C — >
325-6 <--
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
Ob
J-i YEAR
»_* 1963
1969
1970
1971
1973
1973
1974
1975
1976
TOTAL
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH
0.0
-0.000
-0.000
-0.000
-o.ooo
__ -0.000
-0.000
-0.000
-0.000
-0.0
GROWTH
0.0
-0.000
-0.000
-0.000
-0.000
-0.000
-0.000
-0.000
-0.000
-0.0
GROWTH
0.0
-0.000
-0.000
-0.000
-0.000
-0.000
-0.000
-0.000
-0.000
NET INVESTMENT
0.552
0.552
0.552
0.552
0.552
0.552
0.552
0.552
0.552
5.0
NET INVESTMENT
0.662
0.662
0.662
0.662
0.662
0.662
0.662
0.662
0.662
6.0
NET INVESTMENT
0.287
0.287
0.287
0.287
0.287
0.287
0.287
0.287
0.287
REPLACEMENT
0.028
0.028
O.OB3
0.110
0.138
0.165
0.193
0.221
0.248
1.2
MAXIMUM COST
REPLACEMENT
0.033
0.033
0.099
0.132
0.165
0.198
0.232
0.265
0,298
1.5
MINIMUM COST
REPLACEMENT
0.014
0.014
0.043
0.057
0.072
0.086
0.100
0.115
0.129
REQUIREMENT
4.964
4.964
4.964
4.963
4.963
4.963
4.963
4.96?
4.962
CAPITALIZATION
0.552
1.103
1.654
2.205
2.757
3.308
3.859
4.411
4.962
INTEREST
0.042
0.085
0.127
0.170
0.212
0.255
0.297
0.340
0.382
1.9
OPERATIONS
0.035
0.071
0.106
Q.i4i
0.177
0.212
0.247
0.283
0.318
1.6
CASH RQMTS
0.657
0.734
0.867
0.973
1.078
1.183
1.289
1.394
1.499
9.7
(1968 EFFICIENCY)
REQUIREMENT
5.956
5.956
5.955
5.955
5.955
5.955
5.954
5.954
5.954
(MOST EFFICIENT
REQUIREMENT
2.579
2.579
2.579
2.579
2.578
2.578
2.578
2.578
2.578
CAPITALIZATION
0.662
1.323
1.985
2.646
3.308
3.969
4.631
5.292
5.954
REGION)
CAPITALIZATION
0.287
0.573
0.859
1.146
1.432
1.719
2.005
2.292
2.578
INTEREST
0.051
0.102
0.153
0.204
0.255
0.306
0.357
0.407
0.458
2,3
INTEREST
0.022
0.044
0.066
0.088
0.110
0.132
0.154
0.176
0.199
OPERATIONS
0.045
0.091
0.136
0.182
0.227
0.273
0.318
0.363
0.409
2.0
OPERATIONS
0.014
0.028
0.042
0.056
0.070
0.084
0.098
0.112
0.126
CASH RQMTS
0.791
0.887
1.050
1.179
1.309
1.438
1.568
1.697
1.826
11.7
CASH RQMTS
0.337
0.373
0.438
0.488
0.538
0.589
0.639
0.689
0.740
TOTAL
-0.0
2.6
0.6
1.0
0.6
4.8
-------
— - IABL£ ..__..
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S I C —> 327
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
0%
2 YEAR
M 1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
YFAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
GROWTH NET
0.0
1.963
2.052
2.146
2.244
2.347
2.455
2.567
2.684
18.5
GROWTH NET
0.0
2.280
2.384
2.493
2.607
2.727
2.851
2.982
3.118
21.4
GROWTH NET
0.0
0.862
0.901
0.942
0.986
1.031
1.078
1.127
1.179
8.1
INVESTMENT
4.415
4.415
4.415
4.415
4.415
4.415
4.415
4.415
4.415
39.7
INVESTMENT
5.185
5.185
5.185
5.185
5.185
5.185
5.185
5.185
5.185
46.7
INVESTMENT
1.741
1.741
1.741
1.741
1.741
1.741
1.741
1.741
1.741
15.7
REPLACEMENT
0.379
0.379
1.021
1.350
1.683
2.021
2.364
2.713
3.068
15.0
MAXIMUM COST
REPLACEMENT
0.418
0.418
1.170
1.553
1.943
2.339
2.741
3.149
3.564
17.3
MINIMUM COST
REPLACEMENT
0.346
0.246
0.508
0.642
0.778
0.917
1.058
1.201
1.347
6.9
REQUIREMENT
42.904
44.867
46.919
49.065
51.310
53.657
56.112
58.678
61.363
CAPITALIZATION
7.585
13.962
20.430
26.991
33.650
40.412
47.282
54.264
61.363
INTEREST
0.584
1.075
1.573
2.078
2.591
3.112
3.641
4.178
4.725
23.6
OPERATIONS
0.803
1.478
2.163
2.857
3.562
4.278
5.005
5.745
6.496
32.4
CASH RQMTS
6.181
9.310
11.225
12.846
14.495
16.173
17.880
19.618
21.388
129.1
(1968 EFFICIENCY)
REQUIREMENT
49.839
52.119
54.503
56.996
59.604
62.330
65.181
68.163
71.281
(MOST EFFICIENT
REQUIREMENT
18.839
19.701
20.602
21.544
22.530
23.561
24.638
25.765
26.944
CAPITALIZATION
8.355
15.821
23.390
31.069
38.862
46.774
54.811
6?. 978
71.281
REGION)
CAPITALIZATION
4.911
7.514
10.156
12.839
15.566
18.338
21.156
24.024
26.944
INTEREST
0.643
1.218
1.801
2.392
2.992
3.602
4.220
4.849
5.489
27.2
INTEREST
0.378
0.579
0.782
0.989
1.199
1.412
1.629
1.850
2.075
10.9
OPERATIONS
0.943
1.786
2.641
3.508
4.388
5.281
6.188
7.110
8.048
39.9
OPERATIONS
0.387
0.593
0.801
1.013
1.228
1.446
1.669
1.895
2. 125
11.2
CASH RQMTS
7.190
10.888
13.181
15.132
17.116
19.133
21.186
23.276
25.404
152.5
CASH RQMTS
2.752
4.020
4.733
5.327
5.931
6.547
7.174
7.814
8.467
52.8
-------
YEAR
1968
1969
T970~'
1971
1972
1973
1974
^975
1976"
TOT"AL"
YEAR
L 1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
YEA»
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
. _ _ . 1 UPL 1- . ^ _.
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOL
S I C — > 328
< —
.LARS
PROBABLE COST (MEDIAN EFFICIENCY)
GROWTH NET
'0.0
0.144
0.148
0.153
0.158
0.163
0.166
0.174
0.179
1.3
INVESTMENT
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
4.5
REPLACEMENT
0.025
0.025
0.090
0.122
0.155
0.222
0.255
0.289
1.4
MAXIMUM COST
REQUIREMENT
4.500
4.644
4.792
4.945
5.103
5.266
5.434
5.608
5.787
CAPITALIZATION
0.500
1.144
1.792
2.445
3.103
3.766
4.434
5.108
5.787
INTEREST
0.038
0.088
0.138
0.188
0.239
0.290
0.341
0.393
0.446
2.2
OPERATIONS
0.043
0.098
0.153
0.209
0.265
0.322
0.379
0.437
0.495
2.4
CASH RQMTS
0.606
0.855
1.029
1.173
1.317
1.463
1.611
1.759
1.909
11.7
(1968 EFFICIENCY)
GROWTH NET
0.0
0.159
0. 164
0.169
0.175
0.180
0.186
0.192
0.198
1.4
GROWTH NFT
0.0
0.06S
0.067
0.069
0.071
0.073
0.076
0.078
0.081
INVESTMENT
0.553
0.553
0.553
0.553
0.553
0.553
0.553
0.553
0.553
5.0
INVESTMENT
0.225
I'Jgl
0.225
0.?25
0.2?5
0.2?S
REPLACEMENT
0.028
0.028
0.099
0.135
0.172
O.?08
0.245
0.282
0.320
1.5
MINIMUM COST
•'•if PLACEMENT
0.011
0.011
0.040
0.055
0.070
0.0*5
0.100
0.115
0.130
REQUIREMENT
4.977
5.136
5.300
5.469
5.644
5.824
6.010
6.202
6.400
(MOST EFFFCIENT
REQUIREMENT
2.027
2.09?
2.159
2.227
2.299
2.37?
2.448
2.526
2.607
CAPITALIZATION
0.553
1.265
1.982
2.704
3.432
4.165
4.904
5.649
6.400
REGION)
CAPITALIZATION
0.225
0.515
0.807
1.101
1.398
1.696
1.997
2.301
2.607
INTEREST
0.043
0.097
0.153
0.208
0.264
0.321
0.378
0.435
0.493
2.4
INTEREST
0.017
0.040
0.062
0.085
0.108
0.13}
0.154
0.177
0.201
OPERATIONS
0.049
0.112
0.175
0.239
0.303
0.368
0.434
0.499
0.566
2.7
OPERATIONS
0.014
0.033
0.051
0.070
0.089
0.108
0.127
0.146
0.166
CASH RQMTS
0.672
0.949
1.144
1.305
1.467
1.630
1.795
1.962
2.130
13.1
CASH RQMTS
0.268
0.374
0.446
0.504
0.563
0.622
0.682
0.742
0.803
0.6
0.6
1.0
0.8
5.0
-------
- TA8LE _ _
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S.I.C --> 339
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
196ft
J?6.9
1970
197?
1973
1975
'"
GROWTH NtT
0.0
_ 1.32?
1.252
1.2«3
1.315
1.347
1.381
1.415
1.450
INVESTMENT
4.748
4.748
4.748
4.748
4.748
4.748
4.748
4.748
4.748
REPLACEMENT
0.575
0.575
1.174
1.476
1.779
2.083
2.390
2.698
3.008
REQUIREMENT
49.493
50.715
51.968
53.251
54.566
55.913
57.294
58.709
60. 159
CAPITALIZATION
11.508
17.478
23.479
29.510
35.573
41.669
47.798
53.961
60.159
INTEREST
0.886
1.346
1.808
2.272
2.739
3.209
3.680
4.155
4.632
OPERATIONS
1.587
2.411
3.239
4.071
4.907
5.748
6.593
7.443
8.298
CASH RQMTS
7.797
10.302
12.221
13.850
15.488
17.135
18.792
20.459
22.136
TOTAL
YEAR
.._
'1969
1970_
"'1971
197?
1973
1974
1975 "
1 976 _
TOTAL
10.7
GROWTH
0.0
1.404
1.43H
1.474
1.510
1.548
1.586
1.625
1.665
12.2
42.7
NET INVESTMENT
5.565
5.565
5.565
5.565
5.565
5.565
5.565
5.565
5.565
50.1
15.8
MAXIMUM COST
REPLACEMtNT
0.616
0.616
1.315
1.667
2.021
2.376
2.734
3.093
3.455
17.9
MINIMUM COST
24.7
44.3
138.2
(1968 EFFICIENCY)
REQUIREMENT
56.845
58.249
59.687
61.161
62.671
64.219
65.805
67.430
69.095
(MOST EFFICIENT
CAPITALIZATION
12.325
19.294
26.297
33.336
40.411
47.524
54.675
61.865
69.095
REGION)
INTEREST
0.949
1.486
2.025
2.567
3.112
3.659
4.210
4.764
5.320
28.1
OPERATIONS
1.778
2.783
3.793
4.809
5.829
6.855
7.887
8.924
9.967
52.6
CASH RQMTS
8.908
11.854
14.137
16.081
18.037
20.004
21.981
23.971
25.972
160.9
YEAR
1968
1969
1970"
1971
}973
1974
1975
1976
GROWTH
0.0
0.518
0.531
0.544
0.558
0.571
' - 0.58$
0.600
0.615
NET INVESTMENT
1.581
1.581
1.581
l.Sftl
1.581
1.SS1
1.S81 '
1.581
1.581
REPLACEMENT
0.417
0.417
0.628
0.734
0.841
0.948
1.057
1.166
1.275
REQUIREMENT
20.987
21.505
22.036
22.580
23.138
23.709
24.295
24.895
^5.5TO~
CAPITALIZATION
8.341
10.440
12.552
14.677
16.815
18.967
21.133
23.314
25.510
INTEREST
0.642
0.804
0.966
1.130
1.295
1.460
1.627
1.795
.964
OPERATIONS
0.911
1.140
1.370
1.602
1.836
2.071
2.307
2.545
2.785^
CASH RQMTS
3.551
4.460
5.076
5.591
6.109
6.631
7.157
7.687
8.220
TOTAL
4.5
14.2
7.5
11.7
16.6
54.5
-------
' • , 1 fll >1_1- ^ .
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S I C --> 33X
<
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
J969
1970
1971
1972
1973
1974
1975
1976
TOTAL
GROWTH NET
0.0
18.252
21.388
25.062
29.368
34.414
40.327
47.255
55.374
271.4
INVESTMENT
10.262
10.262
10.262
10.262
10.262
10.262
10.262
10.262
10.262
92.4
REPLACEMENT
1.207
1.207
4.215
5.981
7.963
10.197
12.726
15.602
18.884
78.0
MAXIMUM COST
REQUIREMENT
106.233
124.485
145.873
170.935
200.303
234.717
275.044
322.300
377.674
CAPITALIZATION
24.140
52.653
84.303
119.627
159.257
203.932
254.521
312.038
377.674
INTEREST
1.859
4.054
6.491
9.211
12.263
15.703
19.598
24.027
29.081
122.3
OPERATIONS
2.655
5.790
9.270
13.155
17.513
22.426
27.989
34.314
41.531
174.6
CASH RQMTS
15.982
39.565
51.626
63.671
77.368
93.001
110.901
131.459
155.132
738.7
(1968 EFFICIENCY)
Ut 1968
1969
1970
1971
1973
1975
JL976
TOTAL.
YFAR
1968
1969
1970
1971
197?
1973
1974
1975
1976
GROWTH NET
0.0
4.241
4.970
5.824
6.824
7.997
9.371
10.981
12.868
63.1
GROWTH NET
0.0
7.193
H.428
9.877
11.573
13.562
15.892
18.622
21.822
INVESTMENT
1.201
1.201
1.201
1.201
1.201
1.201
1.201
1.201
10.8
INVESTMENT
3.110
3.110
3.110
3.110
3.110
3.110
3.110
3.110
3.110
REPLACEMENT
0.754
0.754
1.335
1.686
2.087
2.547
3.076
3.685
4.388
20.3
MINIMUM COST
REPLACEMENT
O.H49
0.849
1.941
2.591
3.325
4.158
5.108
6.195
7.442
REQUIREMENT
24.686
28.927
33.897
39.721
46.546
54.543
63.914
74.895
87.762
(MOST EFFICIENT
REQUIREMENT
41.864
49.057
57.485
67.36?
78.935
92.497
108.389
127.011
148.833
CAPITALIZATION
15.079
20.521
26.692
33.717
41.742
50.940
61.512
73.694
87.762
REGION)
CAPITALIZATION
16.988
27.290
38.828
51.814
66.497
83.168
102.170
123.901
148.833
INTEREST
1.161
1.580
2.055
2.596
3.214
3.922
4.736
5.674
6.758
31.7
INTEREST
1.308
2.101
2.990
3.990
5.120
6.404
7.867
9.540
11.460
OPERATIONS
9.892
13.463
17.511
22.120
27.385
33.419
40.354
48.346
57.576
270.1
OPERATIONS
1.333
2.142
3.048
4.067
5.219
6.528
8.020
9.725
11.682
CASH RQMTS
13.008
21.239
27.072
33.426
40.711
49,086
58.738
69.887
82.790
396.0
CASH RQMTS
6.600
15.395
19.517
23.633
28.348
33.762
39.996
47.193
55.515
TOTAL
107.0
28.0
32.5
50.8
51.8
270.0
-------
S_I__C —> 33IX
TARI F .. _ . . ..
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH NET INVESTMENT
0.0
0.347
0.354
0.362
0.369
0.377
0.385
0.393
0.401
-1.880
-1.880
-1.880
-1.880
-1.880
-1.830
-1.880
-1.880
-1.880
REPLACEMENT
1.575
1.575
1.422
1.346
1.271
1.196
1.121
1.047
0.973
REQUIREMENT CAPITALIZATION INTEREST
16.467
16.814
17.168
17.530
17.899
18.276
lfl.661
19.054
19.456
31.504
29.972
28.446
26.928
25.418
23.915
22.421
20.934
19.456
2.426
2.308
2.190
2.073
1.957
1.841
1.726
1.612
1.498
OPERATIONS
3.555
3.382
3.210
3.038
2.868
2.698
2.530
2.362
2.195
CASH RQMTS
5.676
5.732
5.297
4.940
4.586
4.233
3.883
3.534
3.188
TOTAL 3.0 -16.9 11.5
17.6 25.8 41.1
MAXIMUM COST (1968 EFFICIENCY)
S YEAR
0*1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH
0.0
0.4fl
0.481
0.491
0.501
0.512
0.522
0.533
0.545
NET INVESTMENT
-1.227
-1.227
-1.227
-1.227
-1.227
-1.22?
-1.227
-1.227
-1.227
REPLACEMENT
1.608
1.608
1.533
1.496
1.460
1.424
1.389
1.354
1.320
REQUIREMENT
22.339
22.810
23.290
23.781
24.282
24.793
25.316
25.849
26.394
CAPITALIZATION
32.157
31.400
30.654
29.917
29.191
28.475
27.770
27.076
26.394
INTEREST
2.476
2.418
2.360
2.304
2.248
2.193
2.138
2.085
2.032
OPERATIONS
4.069
3.974
3.879
3.786
3.694
3.604
3.514
3.427
3.340
CASH RQMTS
6.926
7.243
7.026
6.849
6.675
6.504
6.336
6.171
6.010
TOTAL
4.
-11.0
13.2
20.3
33.3
59.7
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
GROWTH
0.0
0.136
0.138
0.141
0.144
0.147
0.150
0.154
0.157
1.2
NET INVESTMENT
-2.995
-2.995
-2.995
-2.995
-2.995
-2.995
-2.995
-2.995
-2.995
-27.0
MINIMUM COST
REPLACEMENT
1.519
1.519
1.234
1.091
0.949
0.806
0.664
0.522
0 . 380
8.7
(MOST EFFICIENT REGION)
REQUIREMENT
6.433
6.569
6.707
6.848
6.992
7.140
7.290
7.444
'.601
CAPITALIZATION
30.389
27.530
24.674
21.821
18.971
16.123
13.279
10.438
7.601
INTEREST
2.340
2.120
1.900
1.680
1.461
1.342
.023
0.804
0.585
13.2
OPERATIONS
2.390
2.165
1.941
1.716
1.492
1.268
.045
0.821
0.598
13.4
CASH RQMTS
3.255
2.946
2.218
1.634
1.051
0.469
-0.113
-0.694
-1.275
9.5
-------
. . PROJECTED EXPENDITURES IN MH 1 IONS OF 1967 DOLLARS
-- -
S I C -->
3313 < —
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
..196?
1970
1971
1973
1973
1974
1975
197h
TOTAL
an
»-*YEAR
•3.1968.
1969
I97a
1971
J572
1973
1974
1975
1976
TOTAL
GROWTH
0.0
28.508
39.503
30.533
31.597
33.699
33.S40
35.020
36.342
357.9
GROWTH
0.0
43.583
45.102
46.675
48.3Q4
49.989
51.733
53.537
55.405
394.3
NET INVESTMENT
73.393
73.393
73.393
73.393
73.393
73.393
73.393
73.393
73.393
660.5
NET INVESTMENT
121.403
121.402
121.402
121.402
121.402
121.402
121.402
121.402
121.402
1092.6
REPLACEMENT
11.501
11.501
21.741
26.938
32.187
37.493
43.853
48.274
53.756
386.2
MAXIMUM COST
REPLACEMENT
13.902
13.902
30.476
38.880
47.365
55.935
64.593
73.339
83.179
420.6
REQUIREMENT
817.176
845.684
875.187
905.718
937.315
970.014
1003.854
1038.875
1075.117
CAPITALIZATION
230.028
331.930
434.836
538.751
643.741
749.834
857.067
965.481
1075.117
INTEREST
17.712
25.559
33.482
41.484
49.568
57.737
65.994
74.342
82.784
448.7
OPERATIONS
26.510
38.253
50.111
62.088
74.188
86.414
98.772
111.266
123.901
671.5
CASH ROMTS
129.117
177.215
208.230
234.435
260.933
287.736
314.853
342.296
370.077
2324.9
(1968 EFFICIENCY)
REQUIREMENT
1249.256
1392.838
1337.939
1384.615
1432.919
1482.907
1534.640
1588.177
1643.583
CAPITALIZATION
278.037
443.021
609.525
777.603
947.309
1118.700
1291.835
1466.775
1643.583
INTEREST
21.409
34.113
46.933
59.875
72.943
86.140
99.471
112.942
126.556
660.4
OPERATIONS
26.099
41.586
57.215
72.993
88.923
105.011
121.263
137.684
154.281
805.1
CASH RQMTS
182.812
254.584
301.129
339.826
378.937
418.477
458.461
498.904
539.823
3373.0
YEAR
1968
1969
1970
1971
1973
1973
1974
1975
1976
GROWTH
0.0
6.791
7.028
7.373
7.527
7.790
8.061
8.343
8.634
NET INVESTMENT
4.226
4.226
4.226
4.226
4.226
4.226
4.226
4.226
4.226
MINIMUM COST
REPLACEMENT
8.043
8.043
9.157
9.732
10.319
10.920
11.534
12.163
12.806
(MOST EFFICIENT
REQUIREMENT
194.667
201.458
208.486
215.759
223.286
231.076
239.137
247.480
256.113
REGION)
CAPITALIZATION
160.861
171.878
183.132
194.631
206.383
218.399
330.686
243.254
256.113
INTEREST
12.386
13.235
14.101
14.987
15.892
16.817
17.763
18.731
19.721
OPERATIONS
22.646
24.197
25.781
27.400
29.054
30.746
32.476
34.245
36.055
CASH RQMTS
47.301
56.491
60.293
63.617
67.018
70.498
74.060
77.707
81.441
TOTAL
61.4
38.0
92.7
143.6
262.6
598.4
-------
IABLL
-
S I C -->
33?X < —
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1976
TOTAL
j YEAR
9 1968
1969
1970
1971
1972
1973
1974
1 975
1976
TOTAL
YFAR
1968
1969
' 1970
1971
1"972
1973
1974
1975
197*
GRQWTH
0.0
0.107
0.109
0.111
0.113
0.115
0.117
0.119
0.121
0.9
GROWTH
0.0
0.130
0.133
0.135
0.137
0.139
0.142
0.144
0.147
1.1
GROWTH
0.0
0.052
0.053
0.054
0.055
0.056
0.057
0.058
6.659
NtT INVESTMENT
0.550
0.550
0.550
0.550
0.550
0.550
0.550
0.550
0.550
5.0
NET INVESTMENT
0.701
0.701
0.701
0.701
0.701
0.701
0.701
0.701
0.701
6.3
NtT INVESTMENT
0.191
0.191
0.191
0.191
0.191
0.191
0.191
0.191
0.191"
REPLACEMENT
0.096
0.096
0.162
0.195
0.228
0.26?
0.295
0.328
0.362
2.0
MAXIMUM COST
REPLACEMENT
0.104
0.104
0.187
0.229
0.271
0.313
0.355
0.398
0.440
2.4
MINIMUM COST
REPLACEMENT
0.078
0.078
0.103
0.115
0.127
0.1^0
"0.152"
0.165
o.m
REQUIREMENT
6.330
6.437
6.546
6.657
6.770
6.885
7.001
7.120
7.240
CAPITALIZATION
1.929
2.586
3.246
3.907
4.569
5.234
5.901
6.570
7.240
INTEREST
0.149
0.199
0.250
0.301
0.352
0.403
0.454
0.506
0.558
3.2
OPERATIONS
0.111
0.149
0.187
0.225
0.263
0.302
0.340
0.379
0.417
2.4
CASH RQMTS
0.906
1.102
.258
.382
.507
.631
.756
.882
2.008
13.4
(1968 EFFICIENCY)
REQUIREMENT
7.692
7.822
7.955
8.090
8.227
8.366
8.508
8.65?
8.798
(MOST EFFICIENT
REQUIREMENT
3.095
3.147
3.201
3.255
3.310
3.366
3.423
3.481
3.540
CAPITALIZATION
2.080
2.912
3.746
4.582
5.421
6.262
7.105
7.950
8.798
REGION)
CAPITALIZATION
1.570
1.813
2.057
2.302
2.547
2.794
3.042
3.291
3.540
INTEREST
0.160
0.224
0.288
0.353
0.417
0.482
0.547
0.612
0.677
3.8
INTEREST
0.121
0.140
0.158
0.177
0.196
0.215
0.234
0.253
0.273
1 O
OPERATIONS
0.129
0.181
0.232
0.284
0.336
0.388
0.441
0.493
0.546
3.0
OPERATIONS
0.077
0.088
0.100
0.112
0.124
0.136
0.148
0.161
6.173
1 1
CASH RQMTS
1.095
1.341
1.542
1.702
1.863
2.024
2.186
2.348
2.511
16.6
CASH RQMTS
0.467
0.550
0.606
0.649
0.694
0.738
0.782
0.827
0.872
£. O
TOTAL
0.4
1.7
1.1
-------
. > — — . — . . . , , , , 1 Hill 1 . — , . — ' — "
PROJFCTED FXPFNDITIIRFCL TIM MTI 1 ION-; OF 1Q67 DOILARS
5 1 C -->
3321 <—
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
2" YEAR
a i96«
1969
1970
1971
1972
1973
1?74 .
1975
1976
GROWTH
0.0
0.627
0.656
0.687
0.719
0.752
0.787
0.824
0.862
5.9
GROWTH
0.0
0.780
0.817
0.855
0.894
0.936
0.980
1.025
1.073
NET INVESTMENT
1.045
1.045
1.045
1.045
1.045
1.045
1.045
1.045
1.045
9.4
NET INVESTMENT
1.411
1.411
1.411
1.411
1.411
1.411
1.411
1.411
1.411
REPLACEMENT
0.256
0.256
0.425
0.511
0.599
0.689
0.781
0.874
0.970
5.4
MAXIMUM COST
REPLACEMENT
0.274
0.274
0.495
0.608
0.724
0.841
0.961
1.082
1.207
REQUIREMENT
13.480
14.107
14.764
15.450
16.169
16.922
17.709
18.533
19.395
CAPITALIZATION
5.119
6.791
8.493
10.225
11.989
13.786
15.619
17.488
19.395
INTEREST
0.394
0.523
0.654
0.787
0.923
1.062
1.203
1.347
1.493
8.4
OPERATIONS
0.380
0.504
0.631
0.759
0.890
1.024
1.160
1.299
1.440
8.1
CASH RQMTS
2.075
2.956
3.411
3.790
4.177
4.572
4.976
5.389
5.811
37.2
(1968 EFFICIENCY)
REQUIREMENT
16.773
17.553
18.370
19.225
20.119
21.055
. 22,035 _
23.060
24.133
CAPITALIZATION
5.485
7.676
9.904
12.170
14.475
16.822
19,213
21.649
24.133
INTEREST
0.422
0.591
0.763
0.937
1.115
1.295
1.479
1.667
1.858
OPERATIONS
0.451
0.631
0.814
1.000
1.JL89
1.382
1.578
1.779
1.983
CASH RQMTS
2.558
3.687
4.295
4.811
5.333
5.866
6.409
6.964
7.532
TOTAL
YEAR
~
7.4
12.7
-6.5
10.1
10.8
47,5
1969
1970"
J.97J
1972"
1973
1974
197S
1976
TOTAL"
GROWTH
0.0
0.231
0.242
0.253
0.265
0.277
0.290
0.304
0.31*
NET INVESTMENT
0.099
0.099
0.099
0.099
0.099
0.099
0.099
0.099
0.099
MINIMUM COST
REPLACEMENT
0.209
0.209
0.242
0.260
0.278
0.297
0.316
0.336
0.357
(MOST EFFICIENT REGION)
REQUIREMENT
4.967
5.198
5.440
5.693
5.958
6.23S
6.525
6.829
7.147
CAPITALIZATION
4.173
4.504
4.845
5.197
5.561
5.938
6.327
6.730
7.147
INTEREST
0.321
0.347
0.373
0.400
0.428
0.457
0.487
0.518
0.550
OPERATIONS
0.226
0.244
0.262
0.281
0.301
0.322
0.343
0.364
0.387
CASH RQMTS
0.855
1.130
1.219
1.294
1.372
1.452
1.535
1.622
1.712
2.2
0.9
2.5
3.9
2.7
12.2
-------
^Li -->
3332-3 < —
.LL. i wivu ur l"rof \)
"i-Lflna
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
a*
tO YEAR
O 1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
YEAR
1968
1969
1970
1971
1973
1973
1974
1975
1976
GROWTH
0.0
0.441
0.469
0.500
0.532
0.567
0.604
0.643
0.685
4.4
GROWTH
0.0
0.579
0.617
0.657
0.700
0.74(5
0.794
0.84^
0.900
5.8
GROWTH
0.0
0.321
0.236
0.251
0.268
0.285
0.303
0.323
0.344
NET INVESTMENT
0.753
0.753
0.753
0.753
0.753
0.753
0.753
0.753
0.753
6.8
NET INVESTMENT
0.990
0.990
0.990
0.990
0.990
0.990
0.990
0.990
0.990
8.9
NET INVESTMENT
0.378
0.378
0.378
0.378
0.378
0.378
0.378
0.378
0.378
REPLACEMENT
0.038
0.038
0.158
0.221
0.285
0.351
0.419
0.489
0.561
2.6
MAXIMUM COST
REPLACEMENT
0.049
0.049
0.208
0.291
0.375
0.462
0.551
0.643
0.737
3.4
MINIMUM COST
REPLACEMENT
0.019
0.019
0.080
0.111
0.143
0.177
0.211
0.246
0.282
REQUIREMENT
6.776
7.217
7.686
8.186
8.718
9.285
9.888
10.531
11.216
CAPITALIZATION
0.753
1.946
3.168
4.421
5.706
7.026
8.382
9.778
11.216
INTEREST
0.058
0.150
0.244
0.340
0.439
0.541
0.645
0.753
0.864
4.0
OPERATIONS
0.100
0.258
0.420
0.586
0.756
0.931
1.111
1.296
1.486
6.9
CASH RQMTS
0.948
1.639
2.044
2.400
2.766
3.143
3.532
3.934
4.348
24.8
(1968 EFFICIENCY)
REQUIREMENT
8.907
9.486
10.103
10.760
11.459
12.205
12.998
13.843
14.743
(MOST EFFICIENT
REQUIREMENT
3.406
3.627
3.863
4.115
4.382
4.667
4.970
5.294
^T63§
CAPITALIZATION
0.990
2.558
4.165
5.811
7.501
9.236
11.019
12.854
14.743
REGION)
CAPITALIZATION
0.378
0.978
1.593
2.222
2.868
3.532
4.214
4.915
5.638
INTEREST
0.076
0.197
0.321
0.447
0.578
0.711
0.848
0.990
1.135
5.3
INTEREST
0.029
0.075
0.123
0.171
0.221
0.272
0.324
0.378
0.434
5 n
OPERATIONS
0.145
0.375
0.611
0.853
1.101
1.355
1.617
1.886
2.163
10.1
OPERATIONS
0.041
0.106
0.173
0.241
0.312
0.384
0.458
0.534
.612
y~3
CASH RQMTS
1.261
2.191
2.747
3.237
3.743
4.263
4.799
5.353
5.926
33.5
CASH RQMTS
0.468
0.800
0.990
1.153
1.322
1.496
1.675
1.860
2.051
i i 5" "
TOTAL
2.2
-------
—TABLE..
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S 1 C — > 3334
PROBABLE COST (MEDIAN EFFICIENCY)
YFAR
1968
1969
1970
1971
1972
1973
1974
1975
1976" "
TOTAL
11.9
GROWTH NFT INVESTMENT REPLACEMENT
0.0
.-.L.MS
1.43S
1 .454
1.474
1.494
1.514
1.535
1.017
1.017
1.017
1.017
1.017
1.017
1.017
11.017
1.555 11.017
0.811
_Q.H11
2.055
2.679
3.303
3.929
4.555
5.183
5.812
REQUIREMENT CAPITALIZATION
104.354
105.769
107.204
108.658
110.132
111.626
113.140
114.675
116.230
16.219
28.651
41.103
53.574
66.065
78.575
91.106
103.658
116.230
INTEREST OPERATIONS CASH RQMTS
1.249
2.206
3.165
4.125
5.087
6.050
7.015
7.982
8.950
0.453
0.801
1.149
1.498
1.847
2.196
2.547
2.898
3.249
13.530
16.250
18.821
20.772
22.728
24.686
26.648
28.614
30.583
99.2
29.1
45.8
16.6
202.6
MAXIMUM COST (1968 EFFICIENCY)
196R
1969
197Q
1971
1972
1973
1974
1975
GROWTH NET INVESTMENT REPLACEMENT
0.0 15.742 1.047
1.992
2.019
2.047
_2.075
2.103
2.131
2.160
2.189
15.742
15.742
15.742
15.742
15.742
15.742
15.742
15.74?
1.047
2.822
3.712
4.602
5.495
6.388
7.283
8.180
REQUIREMENT CAPITALIZATION INTEREST
146.884 20.944 1.613
148.876
150.896
152.942
155.017
157.120
161.411
163.600
38.679
56.441
74.230
92.047
109.892
127.766
145.668
163.600
2.978
4.346
5.716
7.088
8.462
9.838
11.216
12.597
OPERATIONS
0.573
1.058
1.543
2.030
2.517
3.005
3.493
3.983
4.473
CASH RQMTS
18.975
22.818
26.473
29.246
32.024
34.806
37.593
40.385
43.182
TOTAL
16.7
141.7
40.6
63.9
22.7
285.5
MINIMUM COST (MOST EFFICIENT REGION)
YEAR_
1968
1969
1970
!?_71
1972
1973
1974
1975
1976
TOTAL
GROWTH
0.0
0.527
0.534
0.541
0.549
0.556
0.564
0.571
0.579
NET INVESTMENT
3.738
3.738
3.738
3.738
3.738
3.738
3.738
3.738
3.738
REPLACEMENT
0.447
0.447
O.B74
1.088
1.302
1.517
1.732
1.947
?.163
REQUIREMENT
38.841
39.368
39.902
40.443
40.992
41.548
42.111
42.682
43.261
CAPITALIZATION
8.940
13.204
17.476
21.755
26.041
30.335
34.636
38.945
43.261
INTEREST
0.688
1.017
1.346
1.675
2.005
2.336
2.667
2.999
3.331
OPERATIONS
0.267
0.395
0.523
0.651
0.779
0.908
1.036
1.165
1.294
CASH RQMTS
5.140
6.123
7.014
7.693
8.373
9.054
9.736
10.420
11.105
4.4
33.6
11.5
18.1
7.0
74.7
-------
TABLE
- - PROJECTED EXPENDITURES IN
S I C — > 3331 <--
YFAR
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
L 1968
1969
1970
1971
1V73
1974
1975
1976
TOTAL
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH
0.0
0.453
0.463
0.474
0.486
0.497
O.S04
0.5?1
0.534
3.9
~<$ROWTH
0.0
0.588
0.602
0.616
0.631
0.646
0.661
0.677"~
0.693
5.1
GROWTH
0 ."0
0.125
6.12H
0.131
0.134
0.13H
0.141
0.144
0.1 4fl
NET INVESTMENT
1.913
1.913
1.913
1.913
1.913
1.91 3
1.913
1.913
1.913
17.2
NET INVESTMENT
2.544
2.544
2.544
2.544
2.544
2.544
2.544
2.544
2.544
22.9
NF.T INVESTMENT
6.385
0.385
0.385
0.385
0.385
0.3«5
0 . 385
0.385
0.3H5
PROBABLE COST
REPLACEMENT
0.185
0.185
0.422
0.542
0.661
0.782
0.903
1.025
1.147
5.9
MAXIMUM COST
REPLACEMENT
0.217
0.217
0.531
0.689
0.847
1.007
1.167
1.328
1.490
7.5
MINIMUM COST
REPLACEMENT
0.109
0.109
0.160
0.186
0.212
0.2J8
0.264
0.291
0.317
.
MILLIONS OF 1967 DOLLARS
(MEDIAN EFFICIENCY)
REQUIREMENT
19.003
19.456
19.919
20.394
20.879
21.377
21.886
22.407
22.941
CAPITALIZATION
3.703
6.068
8.444
10.831
13.229
15.639
18.061
20.495
22.941
INTEREST
0.285
0.467
0.650
0.834
.019
.204
.391
.578
.766
9.2
OPERATIONS
0.345
0.566
0.787
.010
.234
.458
.684
.911
2.139
11.1
CASH RQMTS
2.728
3.583
4!772
5.312
5.854
6.400
6.948
7.499
47.3
(1968 EFFICIENCY)
REQUIREMENT
24.686
25.274
25.876
26.492
27.123
27.770
28.431
29.108
29.802
CAPITALIZATION
4.334
7.466
10.612
13.772
16.947
20.138
23.343
26.564
29.802
INTEREST
0.334
0.575
0.817
1.060
1.305
1.551
1.797
2.045
2.295
11.8
OPERATIONS
0.665
1.146
1.629
2.114
2.601
3.091
3.583
4.077
4.574
23.5
CASH RQMTS
3.760
5.070
6.123
7.023
7.929
6.838
9.753
10.672
11.596
70.8
(MOST EFFICIENT REGION)
REQUIREMENT
5.256
5.381
5.509
5.641
5.775
5.913
6.053
6.198
6.345
CAPITALIZATION
2.175
2.685
3.199
3.715
4.235
4.757
5.283
5.812
6.345
INTEREST
0.167
0.207
0.246
0.286
0.326
0.366
0.407
0.448
0.489
-t n
OPERATIONS
0.236
0.292
0.348
0.404
0.460
0.517
0.574
0.631
0.689
/ -^
CASH RQMTS
0.898
1.118
1.267
1.392
1.517
1.644
1.771
1.899
3. 028
* "» r-
TOTAL
1.1
3.5
2.9
4.2
13.5
-------
IABLE
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
S I C — >
34 < —
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
-_126S_...
1970
1971
1972
1973
1974
1975
1976
TOTAL
GROWTH
0.0
4.978
5.226
5.486
5.760
6.047
6.348
6.665
6.997
47.5
NET INVESTMENT
10.351
10.351
10.351
10.351
10.351
10.351
10.351
10.351
10.351
93.2
REPLACEMENT
0.853
0.853
2.399
3.1^0
3.996
4.816
5.651
6.502
7.369
35.6
MAXIMUM COST
REQUIREMENT
99.876
104.854
110.080
115.566
121.326
127.373
133.722
140.387
147.384
CAPITALIZATION
17.065
32.395
47.972
63.810
79.921
96.319
113.019
130.035
147.384
INTEREST
1.314
2.494
3.694
4.913
6.154
7.417
8.702
10.013
11.349
56.0
OPERATIONS
1.634
3.101
4.593
6.109
7.652
9.221
10.820
12.449
14.110
69.7
CASH RQMTS
14.152
21.778
26.263
30.051
33.913
37.852
41.873
45.980
50.176
302.0
(1968 EFFICIENCY)
JJ968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
GROWTH
0.0
6.187
6.496
6.820
7.159
7.516
7.891
8.284
8.697
59.1
NET INVESTMENT
13.048
13.048-
13.048
13.048
13.048
13.048
13.048
13.048
13.148
117.4
REPLACEMENT
0.988
0.988
2.927
3.920
4.931
5.959
7.006
8.072
9.160
44.0
REQUIREMENT
124.143
130.330
136.826
143.646
150.805
158.321
166.212
174.497
183.194
CAPITALIZATION
19.762
38.997
58.540
78.407
98.615
119.178
140.117
161.449
183.194
INTEREST
1.522
3.003
4.508
6.037
7.593
9.177
10.789
12.432
14.106
69.2
OPERATIONS
2.002
3.950
5.930
7.943
9.990
12.073
14.194
16.355
18.558
91.0
CASH RQMTS
17.559
27.176
32.908
37.768
42.721
47.773
52.928
58.191
63.568
380. 6
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
GROWTH
0.0
3.766
3.954
4.151
4.358
4.575
4.803
5.042
5.293
NET INVESTMENT
7.649
7.649
7.649
7.649
7.649
7.649
7.649
7.649
7.649
MINIMUM COST
REPLACEMENT
0.718
0.718
1.869
2.459
3.059
3.671
4.293
4.928
5.575
(MOST EFFICIENT
REQUIREMENT
75.559
79.325
83.279
87.429
91.787
96.362
101.164
106.206
111.500
REGION)
CAPITALIZATION
14.363
25.779
37.382
49.182
61.189
73.413
85.865
98.557
111.500
INTEREST
1.106
1.985
2.878
3.787
4.712
5.653
6.612
7.589
8.585
OPERATIONS
1.271
2.282
3.309
4.353
5.416
6.498
7.600
8.724
9.869
CASH RQMTS
10.745
16.400
19.659
22.400
25.194
28.046
30.957
33.932
36.973
TOTAL
35.9
68.8
42.9
49.3
224.3
-------
.1 ABLE _
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
YFAH
1968
1971
197?
1973
1974
1975
1976"
TOTAL
to YEAR
tfS 1968
"~
1970
" 1971"
1972
1973
1974
1975
1976
TOTAL
YEAR
196H
1970
1971
197?
1973
1974
197S
1976
TOTAL'
--_>L_3_5
PROBABLE COST (MEDIAN EFFICIENCY)
GROWTH
0.0
0.632
0.637
0.642
0.647
0.652
0.657
0.663
0.668
5.2
NET INVESTMENT
7.322
7.322
7.322
7.322
7.3?2
7.322
7.322
7.322
7.322
65.9
REPLACEMENT
1.104
1.104
1.900
2.298
2.697
3.095
3.494
3.893
4.293
23.9
MAXIMUM COST
REQUIREMENT
80.661
81.293
81.930
82.573
83.220
83.872
84.529
85.192
85.860
CAPITALIZATION
22.082
30.037
37.996
45.961
53.930
61.905
69.885
77.870
85.860
INTEREST
1.700
2.313
2.926
3.539
4.153
4.767
5.381
5.996
6.611
37.4
OPERATIONS
2.199
2.991
3.783
4.576
5.370
6.164
6.958
7.753
8.549
48.3
CASH RQMTS
12.325
14.362
16.568
18.378
20.188
22.000
23.813
25.627
27.443
180.7
(1968 EFFICIENCY)
GROWTH
0.0
0.784
0.790
0.797
0.803
0.809
0.816
0.822
0.828
6.4
NET INVESTMENT
9.478
9.478
9.478
9.478
9.478
9.473
9.478
9.478
9.478
85.3
REPLACEMENT
1.212
1.212
2.238
2.752
3.266
3.781
4.295
4.810
5.326
28.9
REQUIREMENT
100.064
ion. 848
101.639
102.435
103.238
104.047
104.863
105.685
106.513
CAPITALIZATION
24.238
34.501
44.769
55.044
65.325
75.613
85.907
96.207
106.513
INTEREST
1.866
2.657
3.447
4.238
5.030
5.822
6.615
7.408
8.202
45.3
OPERATIONS
2.583
3.676
4.771
5.866
6.961
8.057
9.154
10.252
11.350
62.7
CASH RQMTS
15.139
17.807
20.725
23.131
25.539
27.948
30.358
32.770
35.184
228.6
GROWTH
0.0
0.350
0.353
0.356
0.35o
0.361
0.364
0.367
0.370
NhT INVESTMENT
3.322
3.322
3.322
j.322
3.322
3.3??
3.322
3.322
3.322
MINIMUM COST
REPLACEMENT
0.904
0.904
1.271
1.455
l.t.39
1.823
2.008
2.192
2.377
(MOST EFFICIENT
REQUIREMENT
44.656
45.00ft
45.359
45.714
46.073
46.434
<+6.79S
47.164
47 f5~3"4
REGION)
CAPITALIZATION
18.082
21.754
25.428
29.105
32.785
36.468
40.154
43.843
4 7". 534
INTEREST
1.392
1.675
1.958
2.241
2.524
2.806
3.092
3.376
3.660
OPERATIONS
1.508
1.814
2.121
2.427
2.734
3.041
3.349
3.656
3.964
CASH RQMTS
7.126
8.065
9.024
9.801
10.578
11.356
12.134
12.913
13.692
2.9
?9.9
14.6
24.6
94.7
-------
TABLE
PROJECTED. EXPENDITURES IN MILLIONS OF 1967 DOLLARS
SIC — > 3t>
< —
196*
1969
197D
1971
197?
1973
1974
197S
1976
TOTAL
PROBABLE COST (MEDIAN EFFICIENCY)
GROWTH
0.0
3.771
3.896
4.026
4.29H
4.441
4.539
4.741
NET INVESTMENT
9.9S7
9.957
9.957
9.957
9.957
9.957
9.957
9.957
9.957
REPLACEMENT
1.690
1.0*0
3.069
3.769
4.474
S.ld7
5.907
6.634
7.369
REQUIREMENT
113.466
117.237
121.134
125.160
129.319
133.618
138.058
142.647
147.388
CAPITALIZATION
33.806
47.535
61.389
75.372
89.490
103.745
118.144
132.689
147.388
INTEREST
2.603
3.660
4.727
5.804
6.891
7.988
9.097
10.217
11.349
OPERATIONS
3.480
4.893
6.319
7.759
9.212
10.679
12.161
13.659
15.172
CASH RQMTS
17.731
23.972
27.970
31.314
34.694
38.110
41.564
45.056
48.589
33.9
89.6
39.8
62.3
83.3
MAXIMUM COST (1968 EFFICIENCY)
309.0
1971
197?
1973
1976
TOTAL
ycap
1^9
i ->70
: ^72
1 ^73
i ••) 74
! 975
1 976
4.594
4.746
4.90-+
5.067
5.235
5.409
38.7
GROWTH
0.0
2.033
2.100
2.170
2.242
2.317
2.394
2.473
?.555
11.735
1.735
1.735
1.735
1.735
1.735
105.6
NET INVESTMENT
4.145
4.145
4.145
4. 145
4.145
4. 145
4.145
4.145
4.145
4.207
5.031
5.853
6.703
7.5bl
8.408
44.7
MINIMUM COST
REPLACEMENT
1.400
1.400
2.021
2.337
2.656
2.979
3.306
3.637
3.972
142.806
147.551
152.457
157.524
162.759
168.169
(MOST EFFICIENT
REOUIREMENT
61.155
63.188
65.288
67.45P
69.700
72.016
74.410
76.883
79.438
84.131
100.613
117.252
134.054
151.024
168.169
REGION)
CAPITALIZATION
27.994
34.172
40.417
46.732
53.119
59.581
66.119
72.738
79.438
6.478
7.747
9.028
10.322
11.629
12.949
70.1
INTEREST
2.156
2.631
3.112
3.598
4.090
4.588
5.091
5.601
6.117
9.170
10.966
12.780
14.611
16.461
18.330
99.2
OPERATIONS
2.853
3.483
4.119
4.763
5.414
6.073
6.739
7.414
8.096
36.183
40.225
44.310
48.438
52.612
56.832
358.3
CASH RQMTS
10.554
13.691
15.498
17.013
18.547
20.101
21.675
23.269
24.885
TOTAL
18.3
37.3
23.7
37.0
49.0
165.2
-------
PROJECTED EXPENDITURES IN MILLIONS OF 1967 DOLLARS
s I c -->
37 <--
PROBABLE COST (MEDIAN EFFICIENCY)
YEAR
1968
1969
1970
1971
1972
1973
1974
1975
1976
TOTAL
GROWTH
0.0
1.472
1.499
1.555
1.584
1.613
1.643
1.673
12.6
NET INVESTMENT
6.934
6.934
6.934
6.934
6.934
6.934
b.934
6.934
6.934
62.4
REPLACEMENT
1.215
1.215
2.057
2.480
2.904
3.330
3.757
4.186
4.616
25.8
MAXIMUM COST
REQUIREMENT
79.760
81.232
82.732
84.259
85.814
87.398
89.011
90.654
92.327
CAPITALIZATION
24.292
32.697
41.130
49.591
58.080
66.597
75.144
83.720
92.327
INTEREST
1.870
2.518
3.167
3.818
4.472
5.128
5.786
6.446
7.109
40.3
OPERATIONS
2.747
3.697
4.650
5.607
6.567
7.530
8.496
9.466
10.439
59.2
CASH RQMTS
12.765
15.835
18.307
20.366
22.432
24.505
26.586
28.675
30.771
200.2
(1968 EFFICIENCY)
YEAR
1968_
1969
1970
197V"
19J72
T973
1974
1975
J976
TOTAL
GROWTH
0.0
2.265
?.307
2.349
2.393
2.437
2.482
2.528
2.574
NET INVESTMENT
11.706
11.706
11.706
11.706
1 1.706
11.706
1 1 .706
11.706
11.706
REPLACEMENT
1.453
1.453
2.852
3.555
4.260
4.967
5.677
6.388
7.102
REQUIREMENT
122.712
124.977
127.284
129.633
132.026
134.463
136.945
139.473
142.047
CAPITALIZATION
29.064
43.035
57.048
71.103
85.202
99.345
113.533
127.767
142.047
INTEREST
2.238
3.314
4.393
5.475
6.561
7.650
8.742
9.838
10.938
OPERATIONS
3.766
5.576
7.392
9.214
11.040
12.873
14.712
16.556
18.406
CASH RQMTS
19.163
34.314
28.650
32.299
35.960
39.633
43.318
47.016
50.727
19.3
105.4
37.7
59.1
99.5
321.1
1968
_
197n
1971
1972
1973
1974
1975
1976
TOTAL
GROWTH
0.0
0.897
0.914
0.930
0.94U
0.965
0.9*3
1.001
"1.019
NET INVESTMENT
3.471
3.471
3.471
3.471
3.471
3.471
3.4/1" " '
3.471
3.471 "'"•
MINIMUM COST
REPLACEMENT
1.041
1.041
1.479
1.699
1.920
2.142
2. 36 A
2.588
2". FIT
(MOST EFFICIENT REGION)
REQUIREMENT
48.595
49.492
50.405
51.336
52.283
53.248
54.231
55.232
56.25?
CAPITALIZATION
20.829
25.197
29.581
33.982
38.400
42.836
47.290
51.762
56.252
INTEREST
1.604
1.940
2.278
2.617
2.957
3.298
3.641
3.986
4.331
-» f -T
OPERATIONS
2.043
2.472
2.902
3.334
3.767
4.202
4.639
5.078
5.518
CASH RQMTS
8.159
9.821
11.043
12.050
13.062
14.078
15.098
16.123
17.152
7.7
31.2
17.1
116.6
-------
PART III
POLLUTION INDEX
627
-------
POLLUTION INDEX: LOGIC AND METHOD
Indices
The assessment procedure described here is based on the use of a pollution
index. An index is a dimensionless number that expresses a measure or
estimate of the relative magnitude of some condition, in this case water
pollution. Such an index is a shorthand expression for a complex combi-
nation of several factors. Its merit depends on its acceptability and
utility—perhaps only as a reasonable compromise—based on consistent
and careful method, rather than on any rigorous scientific justifica-
tion. Each index should be carefully defined and computed so that it
expresses the relevant condition as closely as practicable, but it
must be understood that no single number can contain all the information
about a complex situation.
Once defined, understood and accepted, indices can be quickly grasped
and compared in cases where assimilating and comparing a whole complex
set of data would be too time-consuming and confusing to be practical or
useful. There will, of course, be many occasions on which the rough
approximation represented by an index will not suffice; at such times
only a detailed analysis of the basic data will satisfy the requirements
or rigor.
Purpose
The problem assessment technique proposed here will produce comparative
measures of:
1. the extent and relative severity of pollution;
2. the approximate causes or sources of the pollution; and
3. changes—in time, location, or degree—in either water pol-
lution or its sources.
The technique has distinct limitations, however, and should not be con-
strued to cover all aspects of program management.
In particular:
1. The technique does not account for unique or specialized situa-
tions. Water bodies that have particular value for aesthetic or
other reasons do not carry particular weight in the index, all
violations of legally established stream criteria being assumed
equal except as modified by a quantifiable difference in dura-
tion and/or intensity;
629
-------
2. It does not include groundwaters, which are essentially
different in characteristics and in the degree of available
knowledge. Only surface waters should be subjected to these
assessment techniques; and
3. It does not-and is not intended to—reflect purely regulatory
violations. Only violations of legal water quality criteria,
not the actions of dischargers, are intended inputs to the inaex
calculation processes. So violations of law, regulation, or
good practice that have no adverse impact on water quality can
not be inferred from the problem assessment technique.
Overview
The material that follows presents the technique for assessing water
pollution problems. The formulations will produce, through a two stage
process: (a) a "pollution index" that quantifies stream pollution at a
geographic level and (b) an allocation of the pollution index that quanti-
fies, at each geographic level, the relative contributions to the pollution
index of each source category (e.g., municipal, industrial, etc.). The
basic unit of observation is termed a "pollution zone," defined as a
stream reach consistently or recurrently out of compliance with one or
more legal water quality criteria. The pollution index value computed
for each zone, together with the relative contributions of each source
category, can be aggregated to form pollution measures for rivers, river
basins, sub-basins, or any other geographic area—up to and including
the entire nation. Definitions of terms and formulations are presented
in the next section, together with implementation guidelines.
The Pollution Index
Definition
A "pollution zone" is a continuous stretch of water in which one or more
water quality criteria are violated over a consistent time period and at
a consistent level of impact.
For each pollution zone, i, to be considered, define:
Where:
P. = pollution prevalence, i.e., length in miles of the
1 pollution zone
D^ = annual duration of pollution based on a 0-1 scale.
I. = Intensity of pollution based on 0-1 scale addressing
impacts on ecology, utility and aesthetics.
630
-------
Evaluation of the three factors PJ, D.J, and I-j is discussed in
more detail in the Implementation Guidelines section.
To produce a pollution index for any geographic area containing more
than one pollution zone, calculate:
r
vi
i=r
M
Where:
M = total stream miles in the geographic area
r = number of pollution zones in the geographic area
The equation represents the aggregated water pollution index for the
geographic area.
Implementation Guidelines
The following topics address, in the order in which their corresponding
tasks would be performed, the implementation of the Pollution Index.
Measurement of Pollution Prevalence (P)
The process of identifying pollution zones is equivalent to quantifying
P, as referred to in the preceding section. A pollution zone is a stream
reach (identified by the upstream and downstream river mile points between
which it lies) or other water area not consistently in compliance with
legal criteria for water quality. The simple existence of a deviation
from anycriterion represents, by definition, a prevailing pollution situ-
ation with a corresponding value of P. There either is or is not pollution
in a legal sense. For purposes of defining P, the number of cirteria vio-
lated and the degree of violation are not important. (Violations of
effluent or treatment regulations that do not create a violation of water
quality criteria do not constitute pollution and do not establish a value
of P. In-stream water quality is the only test applied. Statement of
non-compliance should be_ verifiable by_ stream sampling.)
The end points or boundaries of a pollution zone are defined when:
1. Abutting waters are in compliance with water quality criteria
or are not subject to them; or
2. there is a difference in the intensity or duration of pollution--
e.g., a river is in violation of criteria from R.M. 60 to R.M. 40,
631
-------
but, only sutrmer pollution is involved, while from R.M. 40
to R.M. 0, pollution is year-round. We then have two distinct
pollution zones, and similarly for differences in intensity.
A body of water is defined as being polluted if one or more water quality
parameters do not comply on a consistent or recurrent basis with legal
criteria established for its uses. In the absence of Federal, State or
local government-established cirteria, the evaluator should make the
following judgements: (a) desired stream uses; (b) appropriate criteria
values; (c) compliance with assumed values, to arrive at a determination
as to whether or not a pollution zone exists.
The size of a pollution zone (and thus P) is measured in terms of river
miles; and for lakes, reservoirs, and coastal waters, P is measured in
shoreline miles. To avoid double-counting in cases where a zone divides
two geographic units of assessment, the PDI value for that zone should
be divided equally between them.
Measurement of Pollution Duration (D)
The duration of a pollution situation is measured in terms of the number of
quarter-year periods or seasons in which it occurs. Values are assigned to
these observations as follows:
0.4 for violations occurring within 91 consecutive days.
0.6 for violations occurring within a period >_ 92 consecutive
days, but <_ 183 consecutive days.
0.8 for violations occurring within a period >_ 183 consecutive
days, but <^ 274 consecutive days.
1.0 for violations occurring in all four quarters within a
period > 274 consecutive days.
Measurement of Pollution Intensity (I)
Intensity of pollution is an indicator of the severity of pollution in
a zone, expressed in terms of its effects rather than of water quality
parameters. It permits the evaluator to avoid the process of explicitly
forming judgments concerning the seriousness of each criterion deviation
and to move directly to the question of impacts on human welfare and
ecology.
Values of I range from 0 to 1 and represent the simple addition of the
values assigned to three component measures which classify impacts accord-
ing to ecological, utilitarian and aesthetic considerations. Ecological
impacts include the effects of pollution on the existence or the poten-
tial for existence of desirable life forms, including man. Pollution
effects causing reductions in the economic or resource utilization values
of the water are grouped under utilitarian impacts. Lastly, pollution
effects disagreeable to the senses are included in the category of
aesthetics. The value scale for each of these components follows:
Ecological; Inhibiting or eliminating desirable life forms
0.1 = conditions that threaten stress of life forms (including
sanitary aspects not related to any verifiable instances
of contagions).
632
-------
0.2 = conditions that produce stress on indigenous life
forms.
0.3 = conditions that reduce productivity of indigenous life
forms.
0.4 = conditions that inhibit normal life processes or
threaten elimination of indigenous life forms.
0.5 = conditions that eliminate one or more indigenous life
forms.
Utilitarian: Reducing the economic application of the water resource
0.1 = conditions that require costs above the norm to realize
legally defined (i.e., in water quality standards) uses.
0.2 = conditions that intermittently inhibit realization of
some desired and practical uses or necessitate use of
an alternate source.
0.3 = conditions which frequently or continually prevent the
realization of desired and practical uses or cause
physical damage to facilities.
Aesthetic: Causing effects disagreeable to the senses
0.1 = visually unpleasant.
0.2 = visually unpleasant with association of unpleasant tastes
or odors.
It is expected that the characteristics of many pollution situations will
produce a set of effects falling into more than one of these components.
Thus the diminution of commercially valuable marine life would be reflect-
ed in both the ecological and utilitarian categories of effects. On the
other hand the evaluator should guard against over-zealousness. For
example, a pollution situation may have serious ecological impacts, but
have virtually no impact on the economic or utilitarian value of the
waters, because circumstances of location, climate, hydrology or other
factors remove these values from consideration.
Assignment of PDI values should be a team effort, involving all staff
members familiar with: (a) legally-established water quality criteria
and uses, (b) water quality data, (c) local ecological patterns, and
(d) local water use patterns. It is strongly suggested that staff
biologists provide substantial input-particularly to assignment of I
values relating to ecology. Efforts should be devoted to developing
unanimity with respect to water quality conditions in a fashion that
accurately reflects those conditions as they physically exist, without
regard to regulatory requirements or the behavior of waste discharges.
The form shown in Figure 1 is proposed as the basic tool for calculat-
ing the pollution index for any geographic area. Each pollution zone
(defined as a stretch of water out of compliance with an established
water-quality criterion) occupies one line. Pollution zones should be
established of such length that the values of intensity (I) and duration
(D) are judged to be consistent throughout each zone. In a case where
633
-------
CO
FIGURE 1
POLLUTION INDEX CALCULATION FORMAT
Geographic Unit of Assessment: Region
Region Date
State
STORET Basin
Other
Stream
(1)
Pollution Zone
U/S R.M.
(2)
D/S R.M.
(3)
M
(4)
P
(5)
D
(6)
IE
(7)
(8)
(9)
I
(10)
PDI
(11)
Comments
(12)
Pollution PDI
Index =
M
-------
the intensity (I) is judged to have different values in different
seasons of the year, a separate line should be used for each value
of I.
The column entries are as follows:
1. Stream: Name of stream or other body of water.
2. Upstream River Mile: The river-mile station of the upstream
endpoint of the pollution zone.
3. Downstream River Mile: The river-mile station of the downstream
endpoint of the pollution zone.
4. Miles: The total length of the stream in miles. This entry is
made only once for each stream, not for every pollution zone in
a stream.
5. Prevalence: Column 2 minus column 3. The length of the pollution
zone in miles.
6. Duration: This entry may never have a value greater than 1.0 for
any reach, and is more heavily weighted for pollution (0.4 for one
season) than for non-pollution. Therefore, when different values
of I are assigned to different seasons of the year, the largest
value of I should be assigned the appropriate value of D, speci-
fied in the measurement of pollution duration section. The value
of D for other lines referring to the same reach are determined
by subtracting this value of D from 1.0.
7. Ecological Impact: Defined in measurement of Pollution Intensity
(I) Section.
8. Utilitarian Impact: Defined in Measurement of Pollution Intensity
(I) Section.
9. Aesthetic Impact: Defined in Measurement of Pollution Intensity
(I) Section.
10 Intensity: Columns 7 plus 8 plus 9.
11. V = PDI: Columns 5 times 6 times 10.
The water pollution index for any river basin, or other geographic area
of assessment, is calculated by summing the PDI values for the pollution
zones included and dividing this sum by the sum of the river miles in the
stream or area being assessed.
635
-------
Pollution Allocation to Source Categories
Implementation Guidelines
The pollution source allocation is intended to produce a picture of the
relative contributions of various activities that are pollution sources
(note that not all activities or waste discharges necessarily result in
pollution, as defined) to the situation reflected in the index. Previous
efforts to establish such a ranking were hindered by a lack of correspon-
dence of source contributions with geographically unique indicators ot
the resulting stream pollution and its effects. In addition to offering
progress to the goal of associating discharges with pollution impacts,
the present approach provides a means of unambiguously aggregating meas-
ures of source constributions to meet higher level planning information
needs.
Classification of Pollution Sources
To ensure comparability, the following categories of pollution sources
should be used:
(a) Municipal Wastes (included "other urban" wastes)
(b) Industrial and Power Plant Wastes
(c) Federal Installations
(d) Agricultural and Rural Wastes
(e) Mining Wastes
(f) Water Resource Development
(g) Transportation
This classification may differ from others designed to meet the specific
needs of various regions, but only in degree of detail. In such cases, as
desired, subsets of these categories may be utilized, to any desirable
degree of detail. However, the evaluator must ensure consistency in
aggregating to the above categories for national reporting purposes.
(The category, "Spills of Oil and Hazardous Materials," is not included
here because spills are not a source of pollution in the normal sense, but
rather a probabilistic problem which, by definition, does not occur on a
continuing or recurring basis.)
Estimation of Pollution Contribution
The allocation of V-j (the PDI value for a given reach) among the respon-
sible categories of pollution sources is achieved by first noting an
estimate of the proportion of -total pollution accounted for by each
source category and then multiplying each value by V,-. Figure 2 is the
worksheet to be used for arriving at source contributions.
To account for upstream sources lying outside the pollution zone in
question but contributing to its noncompliance, it is essential that
636
-------
FIGURE 2
POLLUTION SOURCE ALLOCATION CALCULATION FORMAT
Geographic Unit Of Assessment:
Region _
State _
STORET Basin _
Other
Region
Date
00
Pollution Zone Location
Reach-River Miles
Stream U/S (2) D/S (3)
Relative Contribution by Source to PDI
Fed.
PDI Mun. Ind. Inst. Agri. Mining WRD Trans.
(4) (5) (6) (7) (8) (9) (10) (11)
Comment,
Identification
Totals
Relative Contribution %
%
-------
the "total pollution" concept, which serves as a base for estimating
source contributions, focus on the volume of pollutants in the water
relative to assimilative capacity rather than just the volume of dis-
charges occurring within the zone. This may often result in a source
category being assigned a significant share of the stream pollution
when no sources of the type are located within the zone itself. In
cases where waters entering the zone are of high quality, the two volumes
will of course be identical.
Aggregation
The method of deriving source contributions within any geographic unit
of assessment from zone contribution estimates is inherent in the work-
sheet (Figure 2). Summing of sub-totals will produce aggregated values
of source contributions at any desired level.
The source allocation is, of course, a derivative of the pollution index.
The sum of the pollution source contributions in any pollution zone equals
the PDI of that pollution zone. Wherever possible, specific sources as-
sociated with a pollution zone should be identified in the "comment" column
(perhaps by note reference to an associated table of sources). Develop-
ment of the pollution source allocation requires that a working inventory
of sources be developed progressively over time. And while a substantial
portion of the allocation will, of necessity, always be a matter of judg-
ment, wherever possible allocations should be based on simulation models,
calculated assimilation of dilution rates, consideration of gross quanti-
ties of material and materials balance calculations, and other quantitative
analytical techniques. As with the pollution index, we are not concerned
here with breaches of regulations, but with the existence of pollution in
water and what causes it.
Calculation follows the procedure suggested in Figure 2. PDI multiplied
by percent relative contribution in each source category (the sum of
columns 5 through 11 = 100%) provides the set of columnar values that
equal PDI for each line, or pollution zone.
Summation of a column divided by the sum of PDI values provides the
relative contribution of sources for any geographic area or set of pol-
lution zones, up to and including the nation.
638
-------
SUB-bASlN REb INDEX P PUI
QUINN1PIAC RIVER & WESTERN CONN COASTAL
101 1 0.18 100. 66.0
HOUbATONlC RIVER
102 1
0.16 183. 144.0
CONNECTICUT RIVER
104 I
0>
CO
U3THAMES RIVER
lOb
I
NARRAGANSETT BAY
106 I
0.12 1108.
0.11 144.
0.26 241,
MASSACHUSETTS COASTAL
108 1 0.12 43/,
MERR1MACK RIVER
109 I
0.20 451,
522.0
70.0
171.0
27b.O
3b4.0
SUMMARY
NATIONAL WATER POLLUTION ASSESSMENT
JANUARY - FEBRUARY 1971
MILES
36b.
899.
PAWCATUCK RIVER &, EASTtRN CONN COASTAL
103 I 0.09 144. 82.0 866.
4227.
652.
660.
2260.
1749.
MUN. INU.
FED. AGR.
MIN
WRD TRANS
48.0
72.7%
37.0
25.7*
58.0
70.7%
285.0
54.6%
39.0
55.7%
113.0
66.1%
253.0
92.0%
195.0
55.1%
6.0
9.1%
107.0
74.3%
13.0
15.9%
207.0
39.7%
28.0
40.0%
56.0
32.7%
18.0
6.5%
157.0
44.4%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
3.0
4.3%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
1.0
0.6%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
30.0
5.7%
0.0
0.0%
0.0
0.0%
0.0
0.0%
2.0
0.6%
12.0
18.2%
0.0
0.0%
11.0
13.4%
0.0
0.0%
0.0
0.0%
1.0
0.6%
4.0
1.5%
0.0
0.0%
-------
SUB-BASIN KtG INULX P PUI
PiSCATAUUA KIVER & NtW HAMPSHIRE CUASTAL
110 1 0.24 Ifb. 117.0
SACO RIVER AND SOUTH MAilML COASTAL
112 I 0.06 136. 83.0
PRESUMPSCOT RIVER AND CASCO BAY
114 I 0.05 71.
ANOROSCUOGIN RIVER
115 1 0.08 127.
KENNE6EC AND SHEEPSCOT RIVERS
116 I 0.07
cr»
*>
O PENOBSCOT RIVER
117 I
0.04 120.
ST. CROIX RIVER
119 I
^0.0
101.0
168.0
109.0
NORTH MAINE COASTAL
118 I 0.05 365. 194.0
MlLtS
481.
MUN,
I NO.
FtU.
AGR.
WIN
WRU TRANS
0.01 15.
11.0
7bO.
1220.
2440.
2860.
3790.
780.
71.0
60. 7*
^7.0
56.6%
25.0
62.5*
22.0
21.8%
24.0
14.3%
18.0
16.5*
145.0
74.7%
2.0
18.2%
41.0
3b.0%
J6.0
43.4%
15. 0
37. sfc
79.0
78.2%
138.0
82.1%
91.0
83.5%
49.0
25.3%
9.0
81.8%
0.0
o.u%
0.0
0.0%
0.0
o.u%
0.0
0.0%
6.0
3.6%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
5.0
4.3%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUB-BASIN KEG ii\iL»t* p
ST. JOHNS RIv/tR
120 I O.ub 148.
LAKE MEMPHREMAbUb
121 1 O.U 4*.
LAKE CHAMPLA1N
124 I 0.21 626.
UPPER HUDSON RIVER
131 I 0.18 47,
MIDDLE HUDSON RIVER
132 I 0.0 U,
MILES MUN.
INU.
FLU. AGR.
MlN
WRD TRANS
CD
SUMMARY FOR
REGION 1
26.0
Jl.O
0.0
204.
348.2 1664.
174.
0.10 4860. 3034.2 2*701.
14.0
11. b%
23.0
8b.b%
244.6
70.2*
18.0
b8.1*
0.0
0.0*
1681.0
b5.4%
1U4.0
8b.2%
1.0
3.8%
83.6
24.0*
13.0
41.9*
0.0
0.0%
12bl.6
41.2%
4.0
3.3*
0.0
0.0%
0.0
0.0*
0.0
0.0*
0.0
0.0*
13.0
0.4*
0.0
0.0*
2.0
7.7*
11.0
3.2%
0.0
0.0*
0.0
0.0*
13.0
0.4%
0.0
0.0%
0.0
0.0%
9.0
2.6%
0.0
0.0%
0.0
0.0%
10.0
0.3%
0.0
0.0*
0.0
0.0*
0.0
0.0*
0.0
0.0*
0.0
0.0%
32.0
1.1%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
33.0
1.1%
-------
SUB-bASlN REG INOEX P PDI MILES
HOUSATONIC RIVER
102 II 0.0 0. 0.0 0.
LAKE CHAMPLAIN
124 II
ST. LAWRENCE RIVER
125 II 0.14 213.
LAKE ONTARIO
126 II
OS
tONIAGARA RIVER
127 II
0.4b 175. 83.6
0.40 37. 15.3
GENESEE RIVER
128 II 0.09 67.
OSWEGO RIVER
129 II
MOHAWK RIVER
130 II
13.1
SUMMARY
NATIONAL WATEK POLLUTION ASSESSMENT
JANUARY - FtdRUARY 1971
MUN. IND. FED. AGR
0.03 5. 4.0 157.
60.3 417,
181,
38.
ISO,
0.21 105. 50.6 245.
O.JO 75. 36.9 125.
MIN
WRD TRANS
0.0
0.0*
1.0
25.0%
23.6
39.1*
31.0
37.1%
7.d
51.0*
6.3
48.1%
19.3
38.1*
22.5
61.0%
0.0
0.0%
3.0
75.0%
28.9
47.9%
42.7
51.1%
7.2
47.1%
4.6
35.1%
17.7
35.0%
11.0
2<*.8%
1
i
0.0 j
0.0% 1
0.0
0.0%
0.0
0.0%
0.8
1.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0 0.0 0.0
0.0% 0.0% 0.0%
0.0 0.0 0.0
0.0% 0.0% 0.0%
3.0 1.8 1.2
5.0* 3.0% 2.0%
7.5 0.0 0.8
9.0% 0.0% 1.0%
0.2 0.0 0.0
1.3% 0.0% 0.0%
1.4 0.4 0.1
10.7% 3.1% 0.8%
9.6 0.0 2.0
19.0% 0.0% 4.0%
1.7 0.0 0.0
4.6% 0.0% 0.0%
0.0
0.0%
0.0
0.0%
1.8
3.0%
0.8
1.0%
0.1
0.7%
0.3
2.3%
2.0
4.0%
1.7
4.6*
-------
SUB-bASlN REG INDEX P Pul
UPPER HUDSON RIVER
131 II O.OB 37. 23.1
MIDDLE HUDSON RIVER
132 II 0.04 24. 6.6
LOWER HUDSON-NEW YORK METROPOLITAN AREA
133 II 0.36 443. 286.7
NEW JERSEY COAST
134 II
0.15 196.
52.2
LAKE ERIE SHORE (i MINOR TRIBUTARIES
135 II 0.45 179. 130.9
LAKE ONTARIO SHORE - GENESSEE R-OSwEGU R
136 II 0.13 53. 6.9
MILES
292,
185,
792,
355,
294,
53.
MUN.
IND.
FED.
AGR.
MIN
WRD
TrfANS
LAKE ONTARIO SHORE - NIAGARA R TO GENtSSEE R
137 II 0.18 114. 32.7 178.
ST REGIS RIVER
138 II
O.o
0.
0.0
94.
9.2
39.8%
2.9
43.9*
127.3
44.4%
52.2
100.0*
69.2
52.9*
4.6
66.7%
12.1
37.0*
0.0
0.0*
13.9
60.2%
2.9
43.9%
137.4
47.9%
0.0
0.0%
44.4
33.9%
1.9
27.5%
14.4
44.0%
0.0
0.0%
0.0
0.0%
0.3
4.5%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.2
3.0%
7.4
2.6%
0.0
0.0%
17.3
13.2%
0.2
2.9%
3.3
10.1%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.3
4.5%
4.2
1.5%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.3
0.9%
0.0
0.0%
0.0
0.0%
0.0
0.0%
10.4
3.6%
0.0
0.0%
0.0
0.0%
0.2
2.9%
2.6
8.0%
0.0
0.0%
-------
SUB-ttASlN REG INDEA. P
DELAWARE RIVER-ZONE 1
203 II 0.03 28.
DELAWARE RIVER-ZONE 2
206 II 0.20 b.
DELAWARE RiVtR-ZONE J
207 II O.b4 IS,
DELAWARE RIVER-ZONE 4
206 II u.Ob b.
Pul
at
SUSOUEHANNA RIVER
212 II
• ALLEGHENY RIVER
bOl H
SUMMARY FOR
REGION 2
0.12 226.
0.09 6V.
9.0
10.8
2.2
9b.2
17.(3
MILES
272,
13.
17.
39.
804.
188,
MUN.
IND.
FED.
AGH.
MIN
WRD
TRANS
0.19 2071.
940.3
4889,
7.2
80.0%
1.8
69.2%
7.0
64.8%
1.2
54. b*
76.6
80. b*
11.0
o2.5%
493.8
S2.5%
1.8
20.0%
0.8
30.8%
3.2
29.6%
0.9
40.9%
10.7
11.2%
4.1
23.3%
351.5
37.4%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
1.1
0.1%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
Q.0%
7.9
8.3%
0.0
0.0%
59.7
6.3%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
2.5
14.2%
4.7
0.5%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
8.9
0.9%
0.0
0.0%
0.0
0.0%
0.6
5.6%
0.1
4.5%
0.0
0.0%
0.0
0.0%
20.6
2.2%
-------
SUB-BASIN REb INDEX P
DELAWARE RIVER-ZONE 1
203 III U.U4 13.
DELAWARE RIVER-LEHIGH
204 III 0.03 2U.
DELAWARE Rl VER-SCHUYLKiLL
205 III 0.38 70.
DELAWARE RIVER-ZONE 2
20b III 0.21
6.
DELAWARE RIVER-ZONE 3
207 III 0.60 15.
DELAWARE RIVER-ZONE 4
208 III 0.05 6.
SUSQUEhANNA RIVER
212 III 0.19 1137.
PUI
4.8
4.8
bO.O
2.7
10.8
2.2
668.6
SUMMARY
NATIONAL WATER POLLUTION ASSESSMENT
JANUARY - FEBRUARY 1971
MILES
128.
60.
130.
13.
18.
3462,
UPPER CHESAPEAKE BAY 6, MU-UEL CST UEL-MARVA
213 III 0.07 400. 179.8 2554,
MUN.
IND.
FED.
AGR.
MlN
WRO TRANS
3.8
79.2*
l.V
39.6*
9.5
19.0%
1.9
70.4*
7.0
64.8*
1.2
54.5*
148.0
22.2*
105.0
58.4*
1.0
20.8%
1.2
25.0%
9.0
18.0%
0.8
29.6*
3.3
30.6%
0.9
40.9%
65.0
9.7%
62.2
34.6*
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
2.0
0.3%
5.7
3.2%
0.0
0.0%
0.3
6.3%
1.0
2.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
11.0
1.6%
6.9
3.8%
0.0
0.0%
1.4
29.2%
28.5
57.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
442.0
66.1%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
2.0
4.0%
0.0
0.0%
0.5
4.6%
0.1
4.5%
0.0
0.0%
0.0
0.0%
-------
SUB-BASIN REb
POTOMAC RIVLR
214 III
INOtX
PUI
0.13 1066. 454.0
MILES
3400
MUN. IND.
FEU. AGR.
MIN
WRO TRANS
RAPPAHANNOCK ANU YORK K I VtKS-V 1RGINI A COAST
21b Hi 0.02 119. 34.6 1555.
JAMES RIVtR
216 III
CHOWAN RIVER
301 III
ROANOKt RIVER
302 III
0.08 320.
0.01 51,
0.07 191.
153.6
at
CD NORTH CAROLINA COASTAL AREA
305 III 0.0 0.
YAOMN-PEE DEE-LOVYtR PEE DEE RIVER
307 III 0.0 0.
CLINCH RlVLR
0.03
H3.3
0.0
0.0
5.0
1990.
1158.
1143.
10.
150.
92.8
42.5%
11.4
46.8
30.7%
7.1
49.0%
38.0
45.6%
0.0
0.0%
0.0
0.0%
0.5
10.0%
117.1
25.8%
13.1
37.*%
99.0
64.9%
7.4
51.0%
41.1
49.3%
0.0
0.0%
0.0
0.0%
0.0
0.0%
2.8
0.6%
0.2
0.6%
4.9
3.2%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
19.5
4.3%
0.3
0.9%
1.0
0.7%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.1
2.0%
121.8
26.8%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0*0
0.0%
0.0
0.0%
4.2
5.0%
0.0
0.0%
0.0
0.0%
4.4
88.0%
0.0
0.0%
9.6
27.7%
0.9
0.6%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUB-BASIN REG INDEX P POI MILES
HOLSTON RIVER
402 III 0.73 77. 62.0 85.
ALLEGHENY RIVER
501 III 0.32 879. 557.5 1730.
MUN.
INO.
FED.
AGR.
MIN
WRO TRANS
MONONGAHELA RIVER
502 III O.b5 1608. 1107.1
BEAVER RIVER
503 III 0.51 267. 174.3
LITTLE KANAWHA RIVER
505 III 0.19
178. 76.2
Oi
KANAWHA RIVER
507 III
202b
340
0.20 680. 465.1 2378.
GUYANOOT RIVER
508 III 0.75 315. 241.8 324.
BIG SANUY RIVER
509 III 0.64 364. 267.2 417.
0.0
0.0%
129.0
23.1%
181.8
16.4%
53.8
48.1%
21.7
28. b%
106.3
22.9%
64.6
26.7%
74.6
27.9%
62.0
100.0%
48.3
8.7%
61.3
5.5%
55.9
32.1%
17.0
22.3%
130.3
28.0%
19.4
8.0%
14.9
5.6%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
1.3
0.2%
5.2
0.5%
1.5
0.9%
23.3
30.6%
3.5
0.8%
29.4
12.2%
1.5
0.6%
0.0
0.0%
378.3
67.9%
843.4
76.2%
31.2
17.9%
14.2
18.6%
209.2
45.0%
128.4
53.1%
176.2
65.9%
0.0
0.0%
0.0
0.0%
10.0
0.9%
1.9
1.1%
0.0
0.0%
7.2
1.5%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.6
0.1%
5.4
0.5%
0.0
0.0%
0.0
0.0%
8.6
1.8%
0.0
0.0%
0.0
0.0%
-------
SUH-BASIN Rtb iNUt* P PUl MIL£S MUN. IND. FED. AGR. MIN WRD TRANS
OHIO KiVLK MAIN STtM is. MINOR TRIBUTARIES
521 III 0.33 40b. 2tti.3 692. 68.7 46.7 0.0 25.5 73.8 <*.5 9.1
30.1% 20.5% 0.0* 11.2% 32.3% 2.0% 4.0%
LK tKlt SHOkt-CUYArlObA K TO N Y ST LINE
606 III O.tO 41. 40.J 100. 20.1 16.2 0.0 2.0 0.0 0.0 0.0
49.9* 45.2% 0.0% 5.0% 0.0% 0.0% 0.0%
SUMMARY FOH
*E61UN 3 0.20 8437. *6»7.5 24311. 1326.1 695.1 15.6 133.3 2448.4 32.2 36.8
27.1* 18.3% 0.3% 2.7% 50.1% 0.7% 0.8%
OJ
rfN
oo
-------
ROANOKE RIVER
302 IV
TAR RIVER
303 IV
NEUSE RIVER
304 IV
0.07
0.02
83.
t>4,
51.1
0.09 265.
O5
CD NORTH CAROLINA COASTAL AREA
305 IV 0.01 19.
121.2
6.4
CAPE FEAR RIVER
306 IV
SUMMARY
NATIONAL WATER POLLUTION ASSESSMENT
JANUARY - FEBRUARY 1971
SUB-BASIN REG INDEX P PUI MILES
CHOWAN RIVER
301 IV 0.03 53. 18.7 602,
770,
25.2 1322,
1357,
499,
0.09 451. 188.0 2168.
YADKIN-PEE UEE-LOwtR PEE OEE RIVER
307 IV 0.06 500. 204.9 3240.
CATAWBA-WATEREE»CON(JAREE»SANTEE-COOP£R RS
308 IV 0.08 624. 341.3 4517.
MUN.
INO.
FED. AGR.
MIN
WRO TRANS
1.6
8.6*
13.3
26.0%
23.1
91.7*
91. <*
75. 4%
5.9
92.2%
107.0
56.9%
92.3
45.0%
197.4
57.8%
17.1
91.4%
36.8
72.0%
0.0
0.0%
23.3
19.2%
0.0
0.0%
77.2
41.1%
98.5
48.1%
126.9
37.2%
0.0
0.0%
0.0
0.0%
0.0
0.0%
6.5
5.4%
0.3
4.7%
0.0
0.0%
5.4
2.6%
3.1
0.9%
0.0
0.0%
0.0
0.0%
2.1
8.3%
0.0
0.0%
0.0
0.0%
3.8
2.0%
8.3
4.1%
1.3
0.4%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
1.0
2.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
9.5
2.8%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.2
3.1%
0.0
0.0%
0.4
0.2%
3.1
0.9%
-------
SUB-BASIN REG iNOt* P POI MILES
EDISTO-COMBAHEE RlVtR
309 IV 0.01 38. 16.0 1363,
MUN.
IND.
FED. AGR.
MIN
WRO TRANS
SAVANNAH RlVtR
313 iv o.*9 222. 147.0
OGEECHEE RIVER
314 IV
OCOMEE RIVER
315 IV
OCOMULGEE RIVER
316 IV
€»
Cn
O ALTAMAMA RivER
317 IV
SATILLA RIVER
31B IV
0.0
0.03 15.
0.22 98.
0.22 37,
0.03 13.
ST. MAKYS-NASSAU RIVER
319 IV 0.36
0.0
9.0
71.0
33.0
8.0
40.0
300.
245.
265.
327.
147.
260.
110.
4.5
28.1%
48.5
33.0*
0.0
0.0%
6.0
66.7%
42.6
60.0*
18.1
54.8%
4.0
50.0%
10.0
25.0%
11.5
71.9%
«3.8
57.0%
0.0
0.0%
2.0
22.2%
23.4
33.0%
12.9
39.1%
3.0
37.5%
30.0
75.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
14.7
10.0%
0.0
0.0%
1.0
11.1%
3.6
5.1%
2.0
6.1%
1.0
12.5%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
1.4
2.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUB-BASIN REG INDEX P PDI MILES
ST. JOHNS KIVEK
320 IV 0.53 185. 148.0 280.
MUM.
INO.
FEU,
AGR.
MIN
WRD
TRANS
SUWANNEE RIVER
321 IV
0.12 67,
OCHLOCKONEE-ST. MARKS RIVER
322 IV 0.09 25.
WITHLACOOCHEE RIVER
323 IV 0.07 15.
09
tn
TAMPA BAY AREA
324 IV
'PEACE RIVER
325 IV
KISSIMMEE RIVER
326 IV
0.66 188.
0.46 150,
0.38 50,
FLORIDA EAST COASTAL AREA
327 IV 0.16 50.
40.0
18.0
7.0
182.0
94.0
45.0
40.0
336.
210.
100.
275.
206.
120,
250,
88.8
60.0%
19.2
48.0%
11.0
61.1%
0.1
1.4%
67.3
37.0%
31.0
33.0%
22.5
50.0%
25.2
63.0%
18.1
19.0%
8.0
20.0%
3.0
16.7%
4.7
67.1%
78.3
43.0%
1.9
2.0%
0.0
0.0%
10.0
25.0%
1.5
1.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
2.0
5.0%
29.6
20.0%
12.8
32.0%
4.0
22.2%
0.1
1.4%
0.0
0.0%
2.8
3.0%
11.2
24.9%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
34.6
19.0%
56.4
60.0%
11.3
25.1%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
2.1
30.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.8
2.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
1.8
1.0%
1.9
2.0%
0.0
0.0%
2.0
5.0%
-------
SUB-BASIN REli INDEX P
LOWER FLORIDA AREA
328 IV 0.63 1220,
FLINT RIVER
329 IV
0.05 20,
CHATTACHOOCHEE RIVER
330 IV 0.44. 195.
APALACnICOLA RIVER
331 IV 0.30 57.
CHOCTAWHATCHEE RIVER
332 IV 0.06 51.
O9
cn
WPtRDIDO-ESCAMblA RIVER
333 IV 0.58 200.
TALLAPOOSA RIVER
IV 0.05 37.
0.04 20
COOSA RIVER
335 IV
PUI
834.0
16.0
lfc>4.0
34.0
36.0
268.0
13.0
14.0
MILtS
1320,
350,
375.
113.
595.
460,
245,
3b6.
MUN.
I NO.
FED.
AGR.
MIN
WRO TRANS
392.0
47.0%
9.0
56.3%
144.3
88.0%
23.8
70.0%
19.1
53.1%
109.9
41.0%
7.0
53.8%
5.0
35.7%
75.1
9.0%
6.1
38.1%
18.0
11.0%
8.2
24.1%
15.8
43.9%
147.4
55.0%
4.9
37.7%
7.0
bO.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
1.0
7.1%
350.3
42.0%
0.9
5.6%
1.7
1.0%
2.0
5.9%
1.1
3.1%
10.7
4.0%
1.1
8.5%
1.0
7.1%
8.3
1.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
8.3
1.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUB-BASIN REG INDtX P POl MILLS
CAHAbA RIVER
336 IV 0.01 a. 2.0 152.
MUN. INU.
FED. AGK,
MIN
WRD TRANS
ALABAMA RIVER
337 IV 0.07 31. 22.0
UPPER TOMBIGBEE RlVtR
33B IV 0.33 50. 40.0
WARRIOR RIVER
339 IV 0.28 105. 84.0
LOWER TOMB1GEE RlVtR
340 IV 0.59
O»
tn
COM08ILE BAY AREA
341 IV
146. 102.0
PASACAGOULA RIVER
342 IV 0.24 130.
PEARL RIVER
343 IV 0.28 125,
310.
120.
302,
172.
0.43 150. 105.0 245.
105.0 435,
100.0
353.
1.5
75.0*
7.0
31. b*
14.8
37.0*
29.4
35.0%
10.2
10.0*
52. b
50.0%
23.1
22.0*
28.0
28.0*
0.5
25.0%
12.1
55.0%
15.6
39.0*
37.8
45.0%
88.7
87.0*
52.5
50.0%
52.5
50.0*
51.0
51.0%
0.0
0.0*
1.1
5.0*
0.0
0.0*
0.0
0.0*
0.0
0.0*
0.0
0.0*
0.0
0.0*
0.0
0.0*
0.0
0.0%
1.8
8.2%
2.4
6.0%
0.0
0.0%
3.1
3.0%
0.0
0.0%
8.4
8.0%
12.0
12.0%
0.0
0.0%
0.0
0.0%
2.4
6.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
8.4
8.0%
3.0
3.0%
0.0
0.0%
0.0
0.0%
2.4
6.0%
16.8
20.0%
0.0
0.0%
0.0
0.0%
8.4
8.0%
3.0
3.0%
0.0
0.0%
0.0
0.0%
2.4
6.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
4.2
4.0*
3.0
3.0%
-------
SUb-bASIN REt. INDLX H PD1 MILES
CLINCH KlVER
401 IV 0.04 17. b.O 200.
HOLSTON KlVER
402 IV O.b5 13b. bO.O 146.
MUN. IND. FED. AGR. MIN WRD TRANS
FKENCH BROAD RIVER
iv O.J9 142.
LITTLE TENNESSEE RIVEH
404 IV 0.21 5b.
HIwrtSSEE RIVER
405 IV
at
1 ELK kiVER
406
DUCK KlVER
IV 0.03 25.
84.0 21b.
41.0 195,
0.29 b3. b5.0 191,
IV O.UJ 12. 7.0 200.
9.0 300.
TENNESSEt RIVEK-MAIH STEM & MINOR TRIb
40b IV 0.23 22b. 149.0
b52.
0.0
0.0%
4.0
5.0*
39.5
47.0*
b.2
20.0%
0.0
0.0*
5.6
80.0%
4.0
44.4*
46.2
31.0%
0.0
0.0*
40.0
50.0%
21. b
26.0%
28.7
70.0%
51.2
93.1%
0.0
0.0*
5.0
55.6%
82.0
55.0%
0.0
0.0*
13.6
17.0*
0.0
0.0%
0.0
0.0*
0.0
0.0*
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0*
0.0
0.0%
8.4
10.0%
1.2
2.9%
0.0
0.0%
1.4
20.0%
0.0
0.0%
3.0
2.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
8.0
100.0%
22.4
28.0%
14.3
17.0%
2.9
7.1%
3.8
6.9%
0.0
0.0%
0.0
0.0%
17.8
11.9*
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUB-bASlN REG INUtX P PUl MILES
KANAWMA KlVER
507 IV 0.0 0. 0.0 0.
BIG SANUY RIVER
509 IV 0.49 3J5. 213.8 437.
LICKING RIVER
512 IV 0.27 748. 204.1 748,
MUN.
INU.
FEU.
AGR.
MIN
WHO
TRANS
KENTUCKY RIVER
514 IV
SALT RIVER
515 IV
0)
CH GREEN KlVtR
516 IV
12b7. 246.2 1257,
0.34 581.
0.33 13bb.
IVb.l
45b.O
OHIO RIVER MAIN STtM iii MINOR TRIBUTARIES
521 IV 0.33 594. 274.5
13bb,
CUMbERLANU RIVER
520 IV 0.^7 3039. 822.5 3049.
825.
0.0
0.0%
bl.5
28.8%
153.7
75.3*
154.2
b2.6*
105. b
53.8*
232.3
51.1*
3B7.2
47.1*
125.1
45. b*
O.U
0.0%
8.b
4.0*
1.4
0.7%
O.b
0.3*
31.9
lb.3*
3.0
0.7%
150^3
18.3%
33.8
12.3%
0.0
0.0%
0.0
0.0*
0.0
0.0%
0.0
0.0%
2.1
1.1%
0.0
0.0*
11.1
1.3%
0.0
0.0%
0.0
0.0%
2.0
0.9%
48.9
24.0%
39.3
16.0%
56.6
28.9%
56.8
12.5%
128.0
15.6%
67.6
24.6%
0.0
0.0%
141.7
66.3%
0.1
0.0%
51.9
21.1%
0.0
0.0%
104.4
22.9%
93.3
11.3%
45.4
16.5%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
58.5
12.9%
16.0
1.9%
0.9
0.3%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
36.6
4.4%
1.7
0.6%
-------
SUB-dAblN REG INOEX, P PUl
L MISS R — CAIRO TO riELLNA ARK
lOOb IV O.Ob 220. 75. 1
LOWER MISSISSIPPI RIVEK-YAZOO RIVER
1011 IV 0.02 181. 38.5
LOWER MISSISSIPPI RIVER — dIG bLACK RIVER
lOlb IV 0.0 10. 0.<+
LOWER MISSISSIPPI RIVEK-NATCHEZ TO GULF
1021 IV 0.01 13. 2.8
at
SUMMARY KuR
REGION
0.17
MILES
1160
1672.
MUN.
IND.
FED.
AGR.
MIN
WRO
TRANS
67Sii.b 3S12S.
23.3
31.0%
13.4
3^.8*
0.2
SO.0%
0.8
28.6fe
3172.1
47.0%
48.0
63.9*
20.8
S4.0*
0.0
0.0%
0.4
14.3%
1801.3
26.7%
0.8
1.1%
0.0
0.0%
0.0
0.0%
0.1
3.6%
48.6
0.7%
0.7
0.9%
1.9
4.9%
0.0
0.0%
1.2
42.9%
911.8
13.5%
0.0
0.0%
0.0
0.0%
0.2
50.0%
0.1
3.6%
562.9
8.3%
2.3
3.1%
1.2
3.1%
0.0
0.0%
0.1
3.6%
192.2
2.8%
0.0
0.0%
1.2
3.1%
0.0
0.0%
0.1
3.6%
66.9
1.0%
-------
HOCMNG RIVER
506
0.62 238. 161.6
I LITTLE MIAMI RIVER
bll V 0.34 257. 86.8
MIAMI
0.43 720. 309.4
b!7
EAST fORK wrflTt RlVtR
blH V 0.36 10V8. 39^.6
SUMMARY
NATIONAL WATER POLLUTION ASSESSMENT
JANUARY - FEbRUARY 1971
SUB-dASIlM REG INDEX H Hul MILES
dEAVER RIVER
503 V 0.28 160. 82.0
MUSKlNbUM RIVEN
b04 V 0.40 1323. 664.1 1662.
261,
SCIOTO RIVER
51U V 0.27 986. 347.8 1280.
2b7.
720.
U.3<+ 3412. Ilb0.8 3412,
1098.
MUN,
IND.
FED. AC3R.
MIN
WRO TRANS
37.9
46.2*
281.2
42.3*
bO.O
30.9*
183.4
52.7*
51.7
59.6%
167.0
54.0*
b07.2
44. 1*
19V. 7
50.0*
37.9
46.2%
160.1
^4.1%
16.5
10.2*
49.3
14.2*
13.7
15.8%
92.4
29.9%
89.2
7.8*
75.0
18.8%
2.9
3.5*
0.3
0.0*
0.0
0.0*
0.0
0.0*
0.0
0.0%
0.4
0.1*
10.1
0.9*
0.0
0.0*
0.0
0.0%
47.3
7.1*
6.2
3.8%
104.4
30.0%
21.3
24.5*
35.7
11.5%
450.2
39.1%
124.9
31.3*
0.0
0.0%
173.9
26.2%
88.9
55.0%
8.6
2.5%
0.0
0.0%
0.0
0.0%
94.1
8.2%
0.0
0.0%
3.3
4.0%
1.3
0.2%
0.0
0.0%
2.1
0.6%
0.1
0.1%
3.1
1.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
10.8
3.5%
0.0
0.0%
0.0
0.0%
-------
SUH-ciASIN KtO>
wcST FOKK wHiTt
V
iNOtX
937
HUl
368.4
OHIO KlVtk MAIN STtM t. MifMOR TRIBUTARIES
b21 V 0.46 2015.
MAUMtt RIVER
601 \l
SANUUSKY
602
3S0.1
32.3
CUYAHOOA K
b03
O.btt
OS
en
OOLAKt tklt bMORt MAUMEt K TO SANDUSKY
bO^ V 0.00 122. 72.8
LK tKlt SHOKt-SANUUSivY K TO CUYAM06A K
bOb V U.3t> 330. l^y.b
L* tKlt SHOKt-CUYAHOOA K TO N Y ST LINt
60b V 0.33 97. 92.3
MILES
937.
2305.
723.
133,
170.
122.
MUM.
IND.
FEU.
A6R.
MlN
WKU
276.
190.4
bl.7*
J26.2
31.1*
112.0
32.0*
9.2
28.5*
bb.b
86.3%
lb.3
21.0%
8b,2
b7.0*
20.3
22.0*
38.8
10. b*
103.2
9.8*
80.5
23.0%
O.b
1.9*
13.3
13. b*
0.0
0.0%
15.0
10.0%
63. /
69.0*
0.0
0.0%
3.7
0.4%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
136.9
37.2%
211.9
20.2%
157.6
45.0%
22.5
69.7%
0.0
0.0%
57.5
79.0%
44. V
30.0%
8.3
9.0%
2.3
0.6%
388.0
37.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0*
0.0
0.0%
0.0
0.0%
5.4
O.b%
0.0
0.0*
0.0
0.0%
0.0
0.0*
0.0
0.0%
0.0
0.0%
0.0
0.0*
0.0
0.0%
10.8
1.0%
o.c
0.0%
.*
i..O
'i.0%
o.n
H .
-* •* * 7
' • «
U -i / v
-------
SUb-bASIN KEO iNUtX H Pul MILLS MUN. INU. KtO. AOR. MlN WRO TRANS
RED RIVLR OF THt NOKTH
701 V O.lb 7j. 27.2 155.
RAINY RIVtK
702 V 0.2b 23. 23.3 90.
UPPER PORTION UPPLK MISSISSIPPI R
703 V 0.19 80b. 173.b 905.
MINNESOTA RIVER
70^ V O.bb 357. 196.2 357.
ST. CKOIX
70a V O.Ob 29b. 22.5 296.
CJ1
CO LOWER POKTION UPPtK MISSISSIPPI KlVER
706 V 0.23 102e>. 285.7 1252.
WISCONSIN KlVtR
707 V 0.37 350. 157.7
MISSISSlPPI-rfAPSIPINICON ANU TKlbUTAKlES
70b V 0.0 0. 0.0
13. H
<*9.3*
0.0
0.0*
34. ?
20.0%
5.9
3.0*
0.7
3.1*
65.7
23.0*
7.9
5.0%
0.0
0.0%
13.4
49. J*
23.3
100.0%
8.7
5.0%
0.0
0.0%
0.0
0.0%
5.7
2.0%
118.3
75.0*
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
130.2
75.0%
190.3
97.0%
21.8
96.9%
214.3
75.0%
31.5
20.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.4
1.5%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUB-BASIN REb INUEX P PUl MILES MUN. 1ND. FED. AGR. MIN WHO TKANS
HOCK RIVER
70V v 0.16 67. 53.5 330.
MlSSISi>IPPl-10wA-CtOAR RIVERS
7lu V 1.19 49. 5«.l 49.
MISSISSIPPl-UES MOiiMES-SKUNK RIVERS
711 V 0.0 0. 0.0 0.
MlSSISSIHP I-SALT RiVERb
712 v 0.01 2. O.d
CHICAL.U-CALUMET RS.-OtS PLAINES R
713 V O.bJ d3. 70.1
05
cn
OKANKAKEt RIVER
71b V 0.01 2. 1.3
FOX KlVER
716 V 0.33 70. 62.d 190.
ILLlNUlb RIVER
717 v 0.^1 l<4ti. 13b.d 636.
24.1
45.0%
12.0
20.7%
0.0
0.0%
0.6
7b.0%
6b.2
93.0%
O.b
38.5%
51.5
c)2.0%
55.7
41 .0%
27.8
52.0%
34.0
58.5%
0.0
0.0%
0.2
25.0%
4.9
7.0%
O.b
61.5%
11.3
lb.0%
67.9
50.0*
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
1.6
3.0%
12.1
20.8%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
2.7
2.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
9.5
7.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUB-BASIN KEG INDEX P PD1
MISSISSlPPi-ST. LOUIS AREA
718 V 0.43 14. 9.1
KASKASKIA RIVER
720 V
BIG MUOUY KivER
721 V
O.U
0.21 197.
0.0
til.6
MISSISSIPPI RIVER-CAPE OiRARDfcAU AREA
722 V 0.23 bO. lb.3
LAKt SUPtKIOK
823 V
O.Oti
O5
'GKtEN BAY wESTtRIM brtORE
824 V O.Ob
8t).
FUX
CKttK
V 0.12
bl.3
bl.O
LAKE MlCHloAN wESTtRIM
826 V 0.19 372. 17b.2
MILES
21.
46S,
397.
dO.
1689.
838.
MUN,
INO,
FED.
AGR.
MIN
WRD
TRANS
909.
4.1
4b.l*
0.0
0.0*
21.2
26.0*
9.1
49.7*
31. b
23. J1*
25.2
49. U
16.3
32.0*
91.6
b2.3*
b.O
54.9*
0.0
0.0%
0.0
0.0%
9.2
bO.3%
40.5
29.9*
21.0
40.9*
34.7
68.0*
83. b
47.7*
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0*
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
9.8
12.0%
0.0
0.0%
58.7
43.4%
0.5
1.0%
0.0
0.0*
0.0
0.0%
0.0
0.0%
0.0
0.0%
50.6
62.0%
0.0
0.0%
4.6
3.4%
4.6
9.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0*
0.0
0.0*
0.0
0.0%
0.0
0.0*
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUb-bASIN Rtu iNULX P PUI MlLtS
LAKE MlCHlbAN-NORTH SHORt
827 v 0.06 IbB. 31.0 b!7.
LAKt MlCnlOAN NURTntASILKN SHORE
828 V 0.01 20^. 13.1
INO,
FLO.
AGR.
MIN
WRD TRANS
MUSKtbOU RlVtR
0.02
H30
KALAMAZOO
OJ
. JUStPH KlVhK
V 0.10 btt
0.16
0.1V b'd.
LAKE HURON wtSTLRN SHORt
V 0.13
SAOINAW
834
193.
bl.l
6b.7
262.
272.
269.
9b3.
261,
0.3
1.0%
8.4
64. 1*
2.6
b9.lt
<*4.4
91.0%
13.3
31.1%
33.2
6b.0%
bd.t
tb.9%
46.6
70.9*
30. /
9V. 0*
4.7
3b.9%
1.8
40.9%
3.9
8.0*
29. b
66.9*
17.9
3b.0%
34.3
27.0%
17.1
26.0*
0.0
0.0*
0.0
0.0*
0.0
0.0*
0.0
0.0*
0.0
0.0*
0.0
0.0*
11.4
9.0*
0.0
0.0*
0.0
0.0%
0.0
0.0%
0.0
0.0*
0.5
1.0*
0.0
0.0%
0.0
0.0%
lb.3
12.0%
2.0
3.0%
0.0
0.0%
0.0
0.0*
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
1.3
1.0*
0.0
0.0%
0.0
0.0%
0.0
0.0*
0.0
0.0%
0.0
0.0%
0.0
0.0*
0.0
0.0*
1.3
1.0%
0.0
0.0%
0.0
0.0*
0.0
0.0%
0.0
0.0%
0.0
0.0*
0.0
0.0%
0.0
0.0%
5.1
4.0%
0.0
0.0%
-------
SUti-BASiN REb INDEX H POI
LAKE ST. CLAlRfcST. CLAlR KIVER
H35 V 0.32 156. 79.1
LAKE ERIE WESTERN SHORE-OtTROIT RIVER
836 V 0.49 313. 22^.2
LAKE HURON-NOKTH SMOKE
637 V 0.04
7.
CALUMET-BUKNS UITCM COMPLEX
849 v 0.39 37.
BIO SIOUX RIVtR
907 V
0.0
u.
cn
MISSOURI K FKOM NiObRARA R
V 0.0 0.
SUMMARY FOR
REGION &
30.1
0.0
0.0
MILES
251,
MUN.
INU.
FEL>.
A(jR.
M1N
WRU TRANS
80,
78.
7926.3 28769.
39.5
<*9.9%
1^3.6
6
-------
SUB-BAblN RtO INUtX P
PEAKL KlVER
343 VI O.«0 25.
ARK R-KAN-COLO ST LINE TO TULSA
1002 VI 0.02 65.
VERUIGRIS RIVER
1003 VI
0.17 140.
GKANU NEOSMO RIVER
1004 VI 0.0
O5
03
RIVER
VI
0.01
50.
L MISS K—CAIRO TO HELENA ARK
1006 VI 0.01 50.
POI
20.0
17.8
80.5
0.0
6.0
3.9
CIMARRON RIVER-NEw MtA-COLO-KANSAS & OKLA
1007 VI 0.20 230. 186.0
NORfri CANAUlAN KlVtrt
1008 VI 0.17 895. 345.5
SUMMARY
NATIONAL WATER POLLUTION ASSESSMENT
JANUARY - FEBRUARY 1971
MILES
25.
1000,
460,
320,
1080.
640,
915.
MUN.
IND,
FEU. AGR.
MlN
WRU TRANS
5.6
28.0%
6.2
34.8%
25.0
31.1*
0.0
0.0%
2.9
48.3%
1.6
41.0%
146.9
79.0%
89.8
26.0*
10.2
51.0%
9.6
53.9%
29.8
37.0%
0.0
0.0%
2.7
45.0%
0.4
10.3%
39.1
21.0%
69.1
20.0%
0.0
0.0%
0.0
0.0%
1.6
2.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
6.9
2.0%
2.4
12.0%
0.5
2.8%
0.8
1.0%
0.0
0.0%
0.3
5.0%
1.7
43.6%
0.0
0.0%
127.8
37.0%
0.6
3.0%
1.3
7.3%
20.9
26.0%
0.0
0.0%
0.0
0.0%
0.1
2.6%
0.0
0.0%
0.0
0.0%
0.6
3.0%
0.2
1.1%
1.6
2.0%
0.0
0.0%
0.1
1.7*
0.1
2.6%
0.0
0.0%
48.4
14.0%
0.6
3.0%
0.0
0.0%
0.8
1.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
3.5
1.0%
-------
SUti-BASlN REG INDEX P PDI
ARKANSAS R — TULSA TO VAN BUREN
1009 VI O.Ob 115. S8.4
ARKANSAS RIVER — VAN BUREN TO MOUTH
1010 VI 0.03 200. 62.0
LOWER MISSISSIPPI RIVER-YAZOO RIVER
1011 VI 0.0 0. 0.0
SO CANADIAN R-AtJOVt TEX-OKLA ST LINE
1012 VI 0.07 420* 96.4
SO CANADIAN R — bELOW TEX-OKLA ST LINE
1013 VI 0.16 280. 128.0
CD
1014
VI
O.Ob 280.
UPPER REU RIVER—AdOVE UtNlSON
lOlb VI O.Ob 565.
LOWER RED RIVER—BELOW DEN1SON
1016 VI 0.03 747,
56.0
174.0
120.4
MILES
112b.
2320.
MUN.
IND.
FED.
AGR.
MIN
WHO
TRANS
1400.
785.
1045,
3415,
4475,
18.1
31.0%
29. a
48. 1%
0.0
0.0*
29.9
31.0%
80.6
63.0*
20.7
37.0%
113.1
65.0*
51.8
43.0%
16.3
27.9%
18.0
29.0*
0.0
0.0%
7.7
8.0%
24.3
19.0%
3.4
6.1*
10.4
6.0%
36.1
30.0%
0.0
0.0*
1.2
1.9*
0.0
0.0%
1.0
1.0%
2.6
2.0%
0.0
0.0%
5.2
3.0%
1.2
1.0%
2.3
3.9%
4.3
6.9%
0.0
0.0%
51.1
53.0%
9.0
7.0%
20.1
35.9%
31.3
18.0%
10.8
9.0*
7.6
13.0%
1.9
3.1%
0.0
0.0*
6.7
7.0%
9.0
7.0*
11.8
21.1%
10.5
6.0%
15.7
13.0%
8.8
15.1%
4.3
6.9*
0.0
0.0%
0.0
0.0%
2.5
2.0%
0*0
0.0%
3.5
2.0*
4.8
4.0%
5.3
• 9.1%
2.5
4.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
1NULX
PDI
0.03 1048. 122.3
SUH-bASlN RE(j
OUACHITA RIVER
1017 VI
LOWER MISSISSIPPI KivtR—dio BLACK RIVER
1018 VI 0.0 0. 0.0
ATCHAFALAYA RlVtR
1019 VI O.U6 390. 135.6
CALCASItU
1020 VI
0.17 345.
188.1
LOWER MISSISSIPPI KlVEK-NATCHEZ TO GULF
1021 Vl 0.09 231. 117.5
O5
O>
GOMIDULt CGLORADO-SAN JUAN KlVEKS
1102 VI 0.<^1 133.
GILA RIVER
1104 VI
LITTLE COLORADO
1105 Vi
0.0
U.U
45.2
0.0
0.0
MILES
4210.
36,
2285,
112b.
1380,
215.
7S.
bO.
MUM.
IND.
FED.
AGR.
MIN
WRO
TRANS
55. 1
45.1%
0.0
0.0*
51.5
38.0*
45.1
24.0*
55. 7
47. <+*
5.6
12.4*
0.0
0.0*
0.0
0.0*
31.8
26.0%
0.0
0.0*
57.0
42.0*
112.9
60.0*
35.7
30.4*
5.7
12.6*
0.0
0.0*
0.0
0.0*
0.0
0.0*
0.0
0.0*
0.0
0.0*
l.v
1.0*
1.1
0.9*
0.0
0.0*
0.0
0.0*
0.0
0.0*
3.7
3.0*
0.0
0.0*
9.5
7.0*
5.6
3.0*
12.1
10.3*
10.1
22.3%
0.0
0.0%
0.0
0.0*
26.9
22.0%
0.0
0.0%
10.8
8.0%
15.1
8.0*
4.7
4.0*
23.8
52.7%
0.0
0.0%
0.0
0.0%
2.4
2.0%
0.0
0.0%
4.1
3.0%
1.9
1.0%
3.5
3.0*
0.0
0.0%
0.0
0.0%
0.0
0.0%
2.4
2.0%
0.0
0.0%
2.7
2.0%
5.6
3.0%
4.7
4.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUb-bASIN Htb IIMUtA P PU1 MILLS
SAblNL rtlVLR
1201 Vl O.OJ 220. 30.1 1100.
NECHES KlVtK
1202 Vl 0.07 165. 92.7 138l>,
TKINITY (>> SAN JACINTU KlVtKS
1203 VI 0.39 1245. 1044.3
dKAZOS RlVLk
1204 VI 0.07 37s>. 164.0
CULUKAUO KlVLk
120s Vl O.OS 368. 137.7
O5
O5
<3bUAUtLUPt LAVACA AislU SAiM ANTONIO BASIN
1200 VI O.Ob 345. b3.2
MUN. 1ND. FtU. AbK.
WIN
WRD TRANS
2290,
1300.
I'MUtCLS klVLK
1^07 VI O.OJ 140. ^4.3 720.
UPPtK KLCOS KlVtH*
l^Ud Vl U.U2 120. 13.b bib.
8.7
28.9%
30. b
33.0*
b01.3
^8.0*
124. b
7b.O*
92.3
67.0*
39.8
63.0*
13.9
57.2%
3.4
25.2*
17.5
b8.1%
51.0
55.0*
438.6
42.0%
21.3
13.0*
12.4
9.0*
12.7
20.1*
7.3
• 30.0*
2.8
20.7*
0.0
0.0*
0.9
1.0*
20.9
2.0*
3.3
2.0*
2.7
2.0*
1.9
3.0*
0.0
0.0*
0.0
0.0*
3.6
12.0*
4.6
5.0*
20.9
2.0%
6.6
4.0*
22.0
16.0%
2.5
4.0%
1.4
5.8%
7.0
51.9%
0.3
1.0%
1.9
2.0%
31.3
3.0%
6.6
4.0%
8.3
6.0%
2.5
4.0%
1.0
4.1%
O.U
0.0%
0.0
0.0%
0.9
1.0%
10.4
1.0*
1.6
1.0%
0.0
0.0%
2.5
4.0%
0.2
0.8%
0.3
2.2%
0.0
0.0%
2.8
3.0%
20.9
2.0%
0.0
0.0%
0.0
0.0%
1.3
2.1%
0.5
2.1%
0.0
0.0%
-------
bUH-BASlN KEb iNUtX P PDI
KlO OKANDE UPPER AbOVE PtCOS KlVEtf
1209 VI 0.04 630. 104.4
KlO GRANDE LOWER dLLOW PtCOS
1210 Vl 0.06 18b.
SUMMArtY FOR
REGION 6
O.Ob 10010.
32.4
MILES
2575,
520,
3670.2
WON. IND.
FEU.
AGR.
MIN
TRANS
30.3
29.0%
10.7
33.0%
690.6
46.1%
3.1
3.0%
13.9%
1091.4
29.7%
0.0
0.0%
0.4
1.2%
52.8
1.4%
70.0
67.0%
14.9
46.0%
456.9
12.4%
0.0
0.0%
1.3
4.0%
220.6
6.0%
1.0
1.0%
0.3
0.9%
104.0
2.8%
0.0
0.0%
0.3
0.9%
53.9
1.5%
O5
05
oo
-------
SUB-BASIN REO INDEX
MINNESOTA RIVER
704 VII 0.0
PDI
0.
0.0
LOwEK PORTION UPPER MISSISSIPPI RIVER
706 VII 0.18 112. 20.7
MlSSISSlPPl-WAPSIPlNlCON AND TRIBUTARIES
708 VII 0.03 8. 16.0
MISSISSIPPI-IOWA-CEOAR RIVERS
710 VII 0.13 152.
99.2
05
MISSISSIPPI-UES MOlNES-SKUiNiK RIVERS
711 VII 0.04 78. 32.3
MISSISSIPPI-SALT R1VLRS
712 Vll 0.0 3,
MlSSlSSiPPI-ST. LOUIS AREA
71tt VII O.t2 14.
MtRAMEC RIVLR
719 VII
0.02 13.
0.9
9.2
9.8
SUMMARY
NATIONAL WATER POLLUTION ASSESSMENT
JANUARY - FEBRUARY 1971
MILES
112.
616,
810,
540.
22,
496,
MUN.
ING.
FEU.
AGR.
MIN
WRD TRANS
0.0
0.0%
0.6
2.9*
11.8
62.6*
34.7
35.0*
21.0
65.0*
0.6
66.7*
4.1
44.6*
9.0
91. a*
0.0
0.0%
0.0
0.0*
7.0
37.2*
15.9
16.0%
11.3
35.0%
0.3
33.3%
5.1
55.4%
0.0
0.0*
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0*
0.0
0.0%
0.0
0.0*
0.8
8.2%
0.0
0.0%
20.1
97.1%
0.0
0.0%
48.6
49.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0*
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUB-bAbiN Rtb INULX P PUl
MISSISSIPPI RlVtR-CAPfc. GlRARUEAU ARtA
?22 VII O.c'J «0. 18.3
S C MO R SPR1NO CRt£K TO NiOBRARA R
904 VII 0.0 0. 0.0
NIOBRARA KlVER
905 VII
BIG SIOUX KlVtK
907 VII
o.u
O.U5 20.
L PLATTE k FROM N PLATTt
906 VII 0.01
O3
-J
ONOkTM PLATTt RIVER
909 VII 0.03
SOUTH PLATTE RlVEK
910 VII 0.0
KANSAS
911
10.
ll
-------
SUb-BASlN KEG INDEX P PUl
LOtalER MISSOURI K FROM NIObRARA R
912 VII 0.27 612. 326.7
GRANO-CHARITON RIVERS
913 VII O.U2 15.
OSAGE-GASCONAOE RlVtRS
914 Vll 0.01 SO.
ARK R-KAN-COLO ST LINE TO 1ULSA
1002 Vll 0.02 302.
VERDIGRIS RlVtR
1003 VII
O.UJ
so.
f—'GRAND NEOSHO RIVER
1004 Vll O.Ob 343.
*HITE RlVtR
lOOS VII
0.0
60.
L MISS R —CAIRO TO HELENA ARK
1006 Vll 0.0 30.
6.2
2.0
57.1
16.9
113.0
7.2
2.4
MILES
1221.
260.
360.
2770.
6CO.
MUM.
INU.
FEU.
AGR.
MlN
WRO
TRANS
S04S.
680,
283.6
86.8*
0.0
0.0*
1.9
9t>.0%
27.4
48.0*
8.4
49.7*
41.9
37.1*
3.8
52.8%
0.0
0.0%
43.1
13.2%
0.0
0.0%
0.0
0.0*
10.3
18.0*
6.4
37.9%
12.6
11.2%
1.6
22.2*
0.0
0.0*
0.0
0.0*
0.0
0.0*
0.1
5.0*
0.0
0.0*
0.0
0.0*
0.0
0.0*
0.1
1.4*
0.0
0.0*
0.0
0.0%
0.0
0.0%
0.0
0.0%
14.9
26.1%
1.9
11.2%
48.9
43.3%
1.1
15.3*
2.4
100.0%
0.0
0.0%
6.2
100.0%
0.0
0.0%
3.4
6.0*
0.2
1.2%
6.5
5.8%
0.4
5.6%
0.0
0.0*
0.0
0.0*
0.0
0.0%
0.0
0.0%
1.1
1.9%
0.0
0.0*
3.1
2.7%
0.2
2.8%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUB-BASIN KLO iNUtX P PDI MILtS MUM. IND. FED. AGR. MIN WHO TRANS
CIMARRON RIVER-NtW MtX-COLO-KANSAS «. OKLA
1007 VII 0.02 80. 16.0 790. S.O 0.0 0.0 11.0 0.0 0.0 0.0
31.3% 0.0% 0.0% 68.8% U.0% 0.0* 0.0%
SUMMARY FOR
REGION 7 0.04 2396. 767.5 19189. <*7d.4 13^.8 4.0 148.9 16.7 4.7 0.0
60.7% 17.1% 0.5% 18.9% 2.1% 0.6% 0.0%
05
»3
IN?
-------
SUB-ttASlN REb INULX P
REU RIVER OF Trit NORTH
701 VIII 0.18 73.
MINNESOTA RIVER
704 VIII
0.0
0.
SUURIS RIVER Is DEVILS LAKE AKEA
723 VIII 0.02 31.
PDI
27.2
0.0
10.9
UPPER MISSOURI R-HEADWATERS TO MILK R
901 VlII 0.01 64. 10.7
05
<1
^YELLOWSTONE RIVER
902 VIII
0.04 121.
26.7
N CENTRAL MO-FROM MlLK H TO SPRb CR
903 VlII 0.0 0. 0.0
S C MO R SPRlNb CRtEK TO NlOBRARA R
904 VIII 0.01 IbH. 15. a
NiOeiRAKA RIVER
905 VlII
0.0
0.
0.0
SUMMARY
NATIONAL WATER POLLUTION ASSESSMENT
JANUARY - FEBRUARY 1971
MILES
155.
1167,
671,
528.
1538.
0.
MUN,
INO.
FEU. AbR.
MIN
WRD
TRANS
13.4
49.3%
0.0
0.0%
8.2
75.2%
10.7
100.0%
22.0
76. 7%
0.0
0.0%
1.9
12.0%
0.0
0.0*
13.4
49.3%
0.0
0.0%
2.7
24.8%
0.0
0.0%
6.7
23.3%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
13.9
88.0%
0.0
0.0%
0.4
1.5%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SU6-bASIN KtO
JAMES RIVER
906 Vlli
BIG SIOUX RIVER
907 V1I1
INUtX
0.06 164.
0.03 20.
NORTH PLATTE RlVtR
909 VIII 0.0
SOUTH PLATTE RIVER
910 VIII 0.0
31,
KANSAS RIVER
911 VIII
0.0
0.
05
•4
**»LOWER MISSOURI R FROM NIOBRARA R
912 VIII 0.0 0.
POI
45.9
6.4
1.8
0.0
0.0
0.0
UP ARKANSAS R ABOVE KAN-COLO ST. LINE
1001 VIII 0.03 463. 75.4
ARK R-KAN-COLO ST LINE TO TULSA
1002 VIII 0.0 0.
MILES
710.
213.
391,
341,
MUN.
INU.
FEU.
AGR.
MlN
WRU
TRANS
2510.
0.0
45.9
100.0%
5.8
90.6%
1.2
66.7%
0.0
0.0%
0.0
0.0%
0.0
0.0%
13.6
18.0%
0.0
0.0%
0.0
0.0%
0.6
9.4%
0.6
33.3%
0.0
0.0%
0.0
0.0%
0.0
0.0%
3.8
5.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.7
0.9%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
6.8
9.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
50.5
67.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUB-BASIN REb INDEX P Pul MILES
CIMARRON RIVER-NEW MEX-COLO-KANSAS &. OKLA
1007 Vlll 0.0 0. 0.0 0.
MUN.
IND.
KEU.
AGR.
MIN
WRD
LOWER COLORADO RIVER
1101 VIII 0.0
0.
0.0
UPPER COLORADO KlVER
1103 VIII 0.03 401.
GRtEN KlVER
1106 Vlll
0.07 743.
51.8
161.3
O5
U1RIU bKANDE UPPER ABOVE PECOS RIVER
VIII 0.0 0. 0.0
KOOTENAI RIVER
1301 VIII
0.0
0.
CLAKK (-ORK-PEND OREiLLt RIVER
1302 Vlll 0.04 22b.
0.0
77.5
100,
MIDDLE COLORADO-SAN JUAN RlVERb
1102 Vlll 0.18 2368. 483.8 2715.
1756.
2330.
640.
484.
0.0
0.0%
0.0
0.0%
85.4
17.7%
0.0
0.0%
0.0
0.0*
0.0
0.0%
0.0
0.0*
10.1
13.0*
0.0
0.0%
0.0
0.0%
83.7
17.3%
0.0
0.0*
0.0
0.0%
0.0
0.0%
0.0
0.0*
49. b
64.0*
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
2.3
J.O*
0.0
0.0%
0.0
0.0%
273.4
56.5%
51.8
100.0%
161.3
100.0%
0.0
0.0%
0.0
0.0%
11.6
15.0%
0.0
0.0%
0.0
0.0%
41.3
8.5%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
3.9
5.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
O.u%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.6
0.0%
o.:
0.0%
1J « ^
. ,0%
0.0
0.0%
0.0
0.0*
0.0
0.0*
0.0
.• .- o;
-------
SUtJ-bASlN REG
UPPER SNAKt RIVER
1306 VIII 0.0
CENTRAL NEVADA
1503 VIII 0.0
PDI
GREAT SALT LAKE
1507 VIII
SEVIER RIVER
1508 VIII
SUMMARY FOR
i REGION 8
0.0
0.0
MILES MUN.
166,
INO.
FED. AGR.
MIN
WRO TRANS
0.07 239. 180.9 2615.
571. 174.9 1290.
O.Ufa 5683. 1353.0 22693.
0.0
0.0%
0.0
0.0%
102.0
56.4%
22.7
13.0%
342.9
25.3%
0.0
0.0%
0.0
0.0%
64.0
35.4%
46.2
26.4%
271.3
20.1%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
3.0
0.2%
0.0
0.0%
0.0
0.0%
14.9
8.2%
106.0
60.6%
625.8
46.3%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
109.6
8.1%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.4
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUB-bASlN REG INDEX P
LOWER COLORADO KIVER
1101 IX 0.31 llbl.
MlOuLE COLORADO-SAN JUAN RlVtRS
1102 IX O.lo 52.
GILA RlvER
1104 IX
0.08 500.
LITTLE COLORADO RlVtR
llOb IX 0.02
cn
•CUPPER SNAKE KlVER
130b IX 0.0
CENTRAL SNAKE RlVEn
1307 IX 0.0
KLAMATH RIVER
IX
NORTH COASTAL
65,
0.02 IbO,
PUI
496.0
5.2
54.4
11.0
0.0
0.0
50.0
SUMMARY
NATIONAL WATER POLLUTION ASSESSMENT
JANUARY - FEBRUARY 1971
MILES
1590
52,
710,
450.
0.
104.
2035.
MUN. INU.
PEL). AGR.
MIN
WRU TRANS
IX
0.04 449. 129.7 3456.
0.0
0.0%
1.0
19.2%
0.0
0.0%
0.0
0.0%
0.0
0.0*
0.0
0.0%
10.0
20.0%
33.0
25.4%
0.0
0.0%
1.0
19.2%
0.0
0.0*
0.0
0.0%
0.0
0.0%
o.o
0.0%
25.0
50.0*
60.0
46.3%
0.0
0.0%
0.0
0.0%
0.0
0.0*
0.0
0.0*
U.O
0.0*
0.0
0.0*
0.0
0.0%
0.0
0.0%
496.0
100.0%
3.2
61.5%
54.4
100.0%
11.0
100.0%
0.0
0.0%
0.0
0.0*
5.0
10.0%
12.4
9.6%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
10.0
20.0%
24.3
18.7%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUd-dASlN KLb INULX P
SAN KKANCIbCO dAV KtGION
1403 IX 0.23 315.
CtNTKAL COASTAL
IX
PL)I
0.01 80.
SANTA CLARA RIVLR
1405 IX U.02 6.
LOS ANOLLLS RlVtK
14U6 l& 0.08 69.
SANTA AHA
1<*07
IX
0.01
O5
O3SAN L)I£t30 COASTAL KhblON
1408 IX 0.02
SACKAMLNTO KlVt-K
1-+09 IX 0.02
SAN JOAuUlN HlVtK
IX O.U3
18.
19,
19.0
2.4
10.0
1.7
2.5
MILLS
516,
MUN.
IND.
FED.
AGR.
MIN
WRU
TKANS
124.
J6.1
121.
157.
2502.
1095.
97.8
82.7%
7.6
40.0%
0.0
0.0%
8.2
82.0*
1.3
76.5%
2.5
100.0%
13. b
28.9*
7.7
21.3*
14.0
11.8%
7.6
40.0%
2.4
100.0%
0.7
7.0%
0.0
0.0%
0.0
0.0%
5.2
11.1%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.1
1.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
1.9
10.0%
0.0
0.0%
0.9
9.0%
0.4
23.5%
0.0
0.0%
11.0
23.6%
21.4
59.3%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
7.0
15.0%
5.0
13.9%
0.0 c .
0.0% r-.-T.
1.9 O.U
10. U* O.Ot
0.0 O.U
0.0% 0.0>
0.0 0.1
0.0% l.o*
0.0 0.0
0.0% o.o-.;
0.0 0 . 0
0.0*
10.0 0 . r,
21.4*
0.0 2.0
0 . 0 f •j.-'t
-------
SUb-bASlN REb IlMOtX P PDI MILLS
KINGS AND KERN R1VLRS AND TULARE LAKE
1411 U 0.0 0. 0.0 435.
MUM,
INU.
KEU.
AGR.
MIN
WRU
TRANS
NORTHWESTERN LAHONTAN
1501 IX 0.07 184. 33.0
HUMbULUT RIVER
1502 IX
CENTRAL NEVADA
1503 IX
OWENS RIVER
1504 IX
O>
-a
COMOJAVE RIVER
1505 IX
0.04 155.
0.05 182.
0.0
0.0
0.
30.8
17.0
0.0
0.0
COLORADO RIVER DASIN RLOION or-" CALIFORNIA
1506 IX 0.4J 160. 98.8
SALT LAKE
1507 IX 0.0
490,
760,
340,
98.
230.
0.0
0.0
0.0%
6.0
18.2%
4.7
15.3%
0.0
0.0%
0.0
0.0%
0.0
0.0%
15.8
16.0%
0.0
0.0%
0.0
0.0%
0.5
1.5%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0*
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
26.5
80.3%
18.7
60.7%
17.0
100.0%
0.0
0.0%
0.0
0.0%
83.0
84.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
7.4
24.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUB-bASIN REG iNDtX
PDI
MILES MUM.
IND.
FED.
AGR.
MIN
WRD TRANS
SUMMARY FOR
REGION 9
0.07 3956. 1162.5 16835.
209.1
18.0%
116.4
10.0%
0.1
0.0*
762.8
65.6%
19.4
1.7%
46.2
4.0%
8.5
0.7%
OS
CO
o
-------
SUB-bASlN REG iNUtX P P01
KOOTENAI RIVER
1301 X 0.05 70. 10.5
CLARK FORK-PENO ORtlLLE RIVER
1302 X 0.05 33. 12.1
SPOKANE RIVEK
1303 X 0.09 212. 77.3
YAKIMA RlVtR
1304 X
0.02 262.
Oi
CO
'COLUMBIA RIVER ABOVt YAKIMA RIVER
1305 X O.Ul 3b2.
UPPER SNAKE RIVER
1306 X 0.02 448.
CENTKAL SNAKt RIVER
1307 X 0.02 623.
MIDDLE AND LOrttK SNAKt RIVER
1308 X 0.03 815.
25.4
16.7
38.7
76.4
SUMMARY
NATIONAL WATER POLLUTION ASSESSMENT
JANUARY - KEbRUARY 1971
MILES
197,
248,
840,
1080.
193t>.
38.0 1611,
1822,
2721,
MUN.
INC.
FED.
AGR.
MIN
WRD TRANS
1.7
16.2%
1.6
13.2*
21.6
27.9*
6. ti
26. B*
1.7
10.2%
b.3
21.tt%
6.2
16.0*
5.4
7.1%
0.0
0.0%
7.7
63.6%
43.3
56.0%
6.4
25.2%
5.4
32.3*
13.7
36.1%
8.1
20.9%
21. J
27.9%
0.0
0.0%
0.4
3.3*
0.0
0.0%
0.5
2.0*
0.3
l.b*
0.0
0.0*
0.0
0.0%
0.8
1.0*
1.0
9.5*
l.B
14.9%
4.7
6.1%
7.1
28.0%
2.5
15.0%
10.3
27.1%
7.8
20.2%
9.9
13.0%
5.5
52.4%
0.6
5.0%
2.3
3.0%
0.0
0.0%
l.d
10.tt%
0.0
0.0*
4.6
11.9%
9.2
12.0%
2.3
21.9%
0.0
0.0%
5.4
7.0%
4.6
18.1%
5.0
29.9%
5.7
15.0%
12.0
31.0*
29.8
39.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUB-bAbIN KEG INDEX P POI MILES
WILLAMETTE RIVEK
130* X 0.03 479. 90.2 2738.
COLUMBIA RIVER BELOW YAKlMA RIVER
1310 X 0.02 9*9. 72.6 4010.
PUGET SOUND
1311 X 0.02 389. 75.0 3850.
WASHINGTON COAST
1312 X 0.01 273. 13.8 2003.
MUN.
INO.
FEU.
AGR.
MIN
WRO
TRANS
OREGON COAST
1313 X 0.01
05
CO
ts3 SOUTHERN OREGON LAKES
1314 X 0.0
KLAMATH RIVER
1401 X
0.05 18.
SACRAMENTO RIVtR
1409 X 0.0 0,
36.0
0.0
11.5
0.0
4t>50.
60.
254.
46.
27.9
30.9%
7.3
10.1%
28.5
38.0%
2.6
18.8%
to. 5
18.1%
0.0
0.0%
2.3
20.0*
0.0
0.0%
32.5
36.0%
23.9
32.9%
31.5
42.0%
6.6
47.8%
12.2
33.9%
0.0
0.0%
5.8
50.4%
0.0
0.0%
0.9
1.0%
0.0
0.0%
1.5
2.0%
0.0
0.0%
0.4
1.1%
0.0
0.0%
0.0
0.0%
0.0
0.0*
11.8
13.1%
13.1
18.0%
9.7
12.9%
3.5
25.4%
6.5
18.1%
0.0
0.0%
1.1
9.6%
0.0
0.0%
0.0
0.0%
4.4
6.1%
0.0
0.0%
0.0
0.0%
7.2
20.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
17.1
19.0%
23.9
32.9%
3.8
5.1%
1.1
8.0%
3.2
8.9%
0.0
0.0%
2.3
20.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
-------
SUb-bASiN KtO
NOKTHWtbTtrt'M LAHONTAN
A u.U
SALT LAKt
1507 A
0.0
PU1
0.0
0.0
MILLS
75.
MUN.
1NU.
FEU.
AGk,
WIN
WHO TRANS
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
SUMMAKY FUK
KtblON 10
O.U2
28166.
36.8%
0.8%
90.8
15.3%
35.6
6.0%
116.2
19.6%
0.0
0.0%
CD
CO
CO
-------
GRAND TOTALS FOR ALL 10 REGIONS
INDEX P POI MILES MUN. IMP. FED. AGR. MIN WRD TRANS
0.12 76299. 31111.6 260324. 12780.1 7747.9 17<*.5 5342.4 4244.8 567.1 254.8
41.1* 24.9% 0.6* 17.2% 13.6% 1.8* 0.8%
O5
CO
-------
PART IV
SURVEY OF PLANNED CONSTRUCTION
OF
MUNICIPAL WASTE TREATMENT FACILITIES
685
-------
SURVEY PROCEDURE—DECEMBER 1971 ASSESSMENT
Building upon experience from previous assessments, a plan for conducting
the new survey was devised. The plan included: (a) the identification of
the data to be generated and making the data amenable to an existing
Office of Water Programs automated system (to facilitate storage and
retrieval); (b) the identification of the specific municipalities serving
populations of 10,000 or more; and (c) the arrangements for a more direct
involvement of the States and communities in the survey. It was also
determined that the Regional Offices would continue to play the major
role in dealing with the States and municipalities. Accordingly, instruc-
tions, lists of cities, and survey forms were prepared for the Regions
which, in turn, would proceed as follows:
1. Examine and correct the listings, where necessary.
2. Notify the States of the survey pi an--to determine the State's
preference as to whether EPA should deal with municipalities
through the States or directly.
3. Mail the survey forms and instructions to the municipalities,
either directly or through the States.
4. Have the municipalities return the completed survey forms to
the Regions.
5. Enter the initial data furnished by the municipalities into
the computer, via the Regional computer terminal.
6. Send a copy of the computer-prepared printout containing initial
data for all communities in the States to each State for review
and verification at the State agency level.
7. Receive from the States fully completed survey forms showing the
final data.
8. After Regional review, enter the data into the OWP central com-
puter via the terminal.
The analysis of the data and report preparation by the Office of Water
Programs, at Headquarters, was performed on the computer-stored data as
it became available.
To test the concept and operating elements of the survey plan, a pilot
survey was conducted in the States of Alaska, Idaho, Oregon, and
Washington during May and June of 1971. Based on experience with the
pilot study, the instructions and procedures were appropriately modified
prior to initiation of the full scale survey.
The survey, in its formative period, was a joint effort by the Division
of Municipal Waste Water Programs and the Division of Applied Technology.
The former was responsible for the conduct of the survey and the gathering,
analysis, and reporting of the data. The Applied Technology Division was
responsible for the development of the survey form and for the input,
storage, and retrieval of the data. Since it was deemed necessary to
store the survey data in an existing central data bank so that the new
data could be related to already available data on water pollution control
687
-------
facilities, the Office of Water Programs Inventory file was selected as
the repository for the survey information. This decision required that
the format and element structure of the survey conform to the inventory
system (STORE!) operated by the Division of Applied Technology.
With the survey being managed by Municipal Waste Water personnel and the
gathered information being stored in and retrieved from an automated file
operated by Applied Technology personnel, a close operating relationship
had to be established between the two separate organizations in order to
effectively carry out the survey operation. The development of a collab-
orative effort at the Regional level was brought about by the conduct of
a joint survey orientation meeting which involved representatives from
the two Headquarters organizations and their Regional counterparts.
Through the orientation meeting, each group's separate and common respon-
sibilities and the required sequence of events and concomitant timetable
were clarified, and the stage was set for launching the survey with a
sense of unity and common direction.
As a first step in carrying out the survey, the Regional Offices were
requested to examine the list of municipalities identified from the OWP
Inventory File to screen out entries which were recognized as: (a) cur-
rently nonexistent (in terms of providing pollution control services);
(b) having had their needs fulfilled and/or; (c) otherwise in error.
Following the screening, the next step was to determine the municipal
addressee who would be in the best position to provide the required
information. In the smaller municipalities--many of which, in recent
years, became parts of sewer authorities—this was a difficult but neces-
sary task. Concurrently, the States were advised of the details and
offered the opportunity to contact the municipalities themselves if they
felt it was in their interests to do so. The States generally agreed to
EPA going directly to the municipalities. The third step consisted of
the Regions mailing to each municipality three copies of the survey form,
along with instructions and a letter advising them of the purpose and need
for the data.
In accordance with the survey plan, if a response was not received in two
weeks, a follow-up was initiated by the EPA Regional Office. This prompting
with telegrams, telephone calls, special delivery letters, etc., continued
weekly until the municipalities responded. In many instances, the survey
form had to be revised and forwarded again, as the community's serving
organization had recently changed. In some cases, where municipal responses
could not be obtained by mail, the form was completed jointly with Regional
Office staff through a face-to-face visit or telephone conversation with
the proper municipal officials. Most of the visits were made to those
municipalities whose needs would greatly impact the survey. For example,
the large-scaled and diverse needs of Chicago were discussed in a joint
session to provide additional assurance that a full and accurate response
would be obtained.
Responses, as they were received in the Regions, were examined for
688
-------
completeness and adherence to instructions. As necessary, follow-up
calls were made to get additional information or otherwise clarify muni-
cipal entries. The complete and corrected forms were then turned over
to Regional Technical Data and Information staffs for coding, key-punching,
storing, and retrieving using Regional computer terminals. Printouts of
the entered survey data, produced from the terminals, were then returned
to the Regional Waste Water Program staff where they were checked against
the original. As required, corrections were made and, when ready, a clean
computer-prepared printout of the survey form as submitted by the munici-
pality, was mailed to the State for its review and entering of the State's
dates of expected project construction and operation.
The State-reviewed form was then returned to the Regions where the data
were again examined and compared with need data recently received from
the States as part of their annual program plan (one and five year lists).
Discrepancies were reconciled and the data were entered into the terminal.
Copies of the completed survey form were sent to the State and municipality
for their information.
Data from the survey and the State's needs lists were then used to update
the Pending Needs file.
A flow chart of the survey operation, Figure A-l, along with a copy of
the survey form and instructions are included in Appendix A of this report.
Headquarters Operation
When the survey was initiated, it was recognized that—given the usual
obstacles to be faced in assessing the needs of 2300 municipalities by
mail, the ten-week period to complete the cycle, and the fact that those
responsible for the conduct of the survey had other full-time duties to
perform—the ideal goal of 100 percent completion would be difficult to
realize. Yet, despite the difficulties, a high rate of return was achieved:
of the approximately 2300 municipalities surveyed, returns were received
from over 95 percent. A general appraisal made of those municipalities
from which returns were not received indicated that, since most of them
had populations at or just over 10,000, the probability was high that
their needs, if any, would be relatively small. A summary of the responses
is presented in Table 2.
Survey data stored in the central computer via the Regional terminals were
extracted by the Division of Municipal Waste Water Programs for analysis
and reporting. Initially, a series of test summaries were made against
various elements of the data in the survey file to determine their com-
pleteness and reasonableness. Omissions and otherwise questionable data
were searched for and brought to the attention of Regional personnel to
ascertain the reasons for the missing and/or otherwise questionable
entries. Necessary corrections to the central computer file followed.
689
-------
FLOW CHART-ASSESSMENT OF THE NEED FOR SEWAGE TREATMENT FACILITIES, FY-1972-76
vo
o
T
R
R
S
m
(
(
PLAN
*
PILOT \
\ PLT.V.RY /
if
—— »
C!
-------
APPEKPIX A
ENVIRONMENTAL PROTECTION AGENCY
Office of Water Programs
INSTRUCTIONS FOR MUNICIPALITIES PARTICIPATING IN SURVEY TO ASSESS
NATIONAL NEEDS FOR CONSTRUCTION OF SEWAGE TREATMENT FACILITIES
Please review the survey form completely and read these instructions
before you start to make entries on the form. We would suggest that
you rough out the information on a plain piece of paper. If you have
questions regarding the completion of any aspect of this form, please
contact:
The purpose of the survey is to record the most accurate information
available on your community's needs for waste treatment facilities and
associated costs with particular emphasis on those needs required to
meet water quality standards implementation schedules and/or enforcement
actions through Fiscal Year 1976.
This information is important for us to use in evaluating the scope of
pollution problems and in developing appropriate plans of action to mee*
these problems. Projects for which EPA grants have already been awarded
are not to be included in this report.
There are blanks on the form for input from both you and your State water
pollution control agency. Please complete only the following:
(402) (409) (505)
(403) (410) (506)
(404) (ID#) (507)
(405) (501) (510)
(406) (502) (511)
(407) (Meeds) (512'
(408) (504) (513
If the municipality named in A. on the survey form is no longer responsible
for municipal waste, please contact:
In other words, if a new sanitary authority has assumed responsibility for
your sanitary wastes, please make the above contact so that we may survey
the new sanitary authority and so correct the record on your municipality.
691
-------
INSTRUCTIONS FOR COMPLETING FORM
(402) Give that portion of population of the municipality, sanitary
district, etc., served by the municipality's facilities. Use
the latest decennial census figures for this purpose. When
the municipality's facilities serve other community(ies), this
number should be the total of all population served.
(403) Give the numbers of the Federal congressional districts in which
the municipality is located, e.g., 01, 05, 09, etc.
(404) Give the method upon which the use charge is based, e.g.,
Hydraulic Volume; Quantity of BOD; Quantity of Solids; both
Solids and BOD; and, both Volume and Quality. If other means
are used, specify the method. Use Keywords shown on attach-
ment #2.
(405) Give the year the present usage rate was established.
Give the name (406), title (407), address (408) and telephone number (409)
of the individual providing the information as well as the
date (410) it v/as supplied.
Needs information is reported by discharge. A discharge is defined
as: An actual or potential unique deposit directly to a surface
body of water, particularly to a river, stream, estuary, lake or
pond; or, to the surface which will ultimately reach a surface
body of water; or, to a surface which is impounded; or, to under-
ground; or, into another transport system (usually via an inter-
ceptor). "Another transport system" is any method of deposit
transport whose physical facilities are under the control of an
organization different from the discharger (owner of interceptor),
such as another municipal sev/er authority.
(ID#) A discharge is named by an ID#. The first two digits are the
municipality's State code. The next five digits are the munici-
pality's community code. The next four digits are the munici-
pality's treatment facility number (the waste and collection
system). The last digit is the discharge number. If a facility
has two or more discharges, an ID# for each discharge should be
repeated for each discharge with only the 12th digit changing.
Please check the listing of discharges for your municipality for
correctness. Change the last five digits of the ID# if the list-
ing of discharges is incorrect. Where only one discharge for a
facility exists, a zero is assigned in the 12th digit for the
discharge. If two or more discharges exist for the same facility,
use 1, 2, 3, and so on for the 1st, 2nd, 3rd, and so on discharges.
Example: 41 67840 0001 0 Portland, Columbia Blvd. Treatment Plant
41 67840 0002 0 Portland, Tryon Creek Treatment Plant
Example: 41 67840 0001 1 Portland, Col. Blvd. Treatment Plant
Discharge #1
41 67840 0001 2 Portland, Col. Blvd. Treatment Plant
Discharge #2
-------
(501) & (502) Give the discharge name, e.g., Portland, Columbia
Blvd. Treatment Plant; Portland, Johnson Creek Interceptor;
etc. Include the facility name in the discharge name.
(Needs) Describe, using the Keyword List appended as Attachment #1,
the needs for the discharge. (Do not include projects currently
receiving EPA financial assistance.) A need is defined as a
project for which monies have been or will be requested to
accomplish: the construction of a new facility; the modification
of an existing facility; an increase in the capacity or treat-
ment levels; or an increase in capacity and treatmentTevels.
To identify such a need, two words from the attached list must
be used.
The first three characters of the need identifier represent
action; e.g., "NEW" meaning "New Facility." The second three
characters of the need identifier describe the needed action;
e.g., "TER" meaning "Tertiary Treatment." "NEWTER" would
then be translated to mean a "New Facility with a capability
of Tertiary Treatment." An "INTSEC" means that the Treatment
Level will be increased to the Secondary Level. In each case
the acronym must begin with the three letter word which identi-
fies the facility action and be followed by the action descrip-
tion. While the need categories of Primary, Intermediate,
Secondary, and Tertiary may incorporate some of the other needs,
please identify separately each need defined on the Keyword List.
It is possible that there can be tv/o or more identical needs
for the same discharge. When recording this situation, the
need entries must be distinguished by the addition of a digit in
the 7th character position of the need word.
Continuing the previous example:
4167840 0001 1 Portland, Columbia Blvd. T. P. INTSEC
NEWSIN 1
NEWSIN 2
4167840 0002 1 Portland, Tryon Creek T. P. INCSEC
The second and third entries indicate two separate interceptor
projects, the v/astes from which will be treated at the Columbia
Blvd. Treatment Plant. Since the needs are to be satisfied by
two separately timed and. funded projects, they are identified
separately by the addition of the digits 1 and 2 following the
need acronym.
(504) Give the cost in current year dollars of that portion of the
project eligible for EPA assistance (i.e., include items such
as engineering and administration, but do not include ineligible
costs such as collection system.)
693
-------
(505) Give the percentage, based on flow quantity, of the effluent
from this discharge which can be attributed to industrial
wastes.
(506) Give the date, by year and month (71/11), that the municipality
plans start of construction.
(507) Give the date, by year and month (73/01), that the municipality
plans to begin operations with the project (need satisfied).
(510) Give the reason for the requirement; e.g., to meet WQS; Court
order; Federal Enforcement Conference; State Enforcement Con-
ference, etc. (See Attachment #2.)
(511)(512)(513) Give additional employee requirements which are
directly attributable to the construction, improvement, etc.
Show these in the categories of Professional, Operation and
Maintenance, and others. Although the types of personnel are
named, show total numbers only in each numbered column; e.g.:
(511)
Professional includes:
(Superintendent )
(Asst. Superintendent )
(Operations Supervisor)
(Chemist
(Biologist
(Engineer
(Sanitary Engineer )
Show as:
(511)
3
(512)
Operations/Maintenance includes:
(Shift Foreman )
(Operator )
(Maintenance Supervisor )
(Mechanical Maintenance Foreman)
(Mechanic )
(Maintenance Helper )
(Electrician )
(Painter )
(Laborer )
Show as:
(512)
7
(513)
Other includes:
(Other Para-Professionals,
e.g., Laboratory Technician)
(Storekeeper )
(Clerk Typist )
(Automatic Equipment )
(Operator )
(Laborer )
Clerical (
(Other )
Show as:
(513)
0
694
-------
I-Y ACTION
KtY VM i-
I Jew ^ Facility
Modification (no increase in capacity or treatment) MOD
Increase in Capacity INC
Increase in Treatment Level INT
Both increase in Treatment Level and Capacity ICT
FACILITY DESCRIPTION
KEY WORD
Primary
Intermediate <85% BOD Removal INT
Secondary ^85% BOD Removal SEC
Tertiary TER
Phosphate Removal PHO
Nitrate Removal NIT
Disinfection DIS
Sludge Processing SLP
Sludge Disposal SLD
Outf al 1 OUT
Deep Ocean Outfall DOO
Sanitary Intercepter Sewer SIN
Combined Intercepter Sev/er CIN
Pumping Station IPU
Force Main IMM
Combined Sev/er Overflow Control at Sev/er OCS
Combined Sev/er Overflow Control at Plant OCP
695
-------
REASONS FOR REQUIREMENT
(in hierarchial order-lowest to highest)
LOG - Locally Developed Plan
SQS - State Approved Implementation Schedule
WQS - Federal Approved Water Quality Standards Implementation Plan
COS - FY '71 More Stringent Federally Approved WQS
ENF - Federal Enforcement Procedures or Actions
CRT - State Court Order
FED - Federal Court Order
CHARGE CODES
QUAHYD - Hydraulic Volume
OUABOD - Quantity of BOD
QUASOL - Quantity of Solids
BODSOL - Both BOD & Solids
QULVOL - Both Volume & Quality
OTHERS - Other
696
------- |