                    GUIDANCE FOR LANDFILLING WASTE   ,,
                    IN ECONOMICALLY DEVELOPING COUNTRIES

-------
                            FOREWORD
The U. S. Environmental Protection Agency is charged by Congress with pro-
tecting the Nation1 s land, air,  and water resources.  Under a mandate of national
environmental laws,  the Agency strives to formulate and implement actions lead-
ing to a compatible balance between human activities and the ability of natural
systems to support and nurture life.  To meet this mandate,  EPA's research
program is providing data and technical support for solving environmental pro-
blems today and building a science knowledge base necessary to manage our eco-
logical resources wisely, understand how pollutants affect our health, and pre-
vent or reduce environmental risks in the future.

The National Risk Management Research Laboratory is the Agency's center for
investigation of technological and management approaches for reducing risks
from threats to human health and the environment. The focus of the Laboratory's
research program is on methods for the prevention and control of pollution to air,
land, water, and subsurface resources; protection of water quality in public water
systems; remediation of contaminated sites and groundwater; and prevention and
control of indoor air  pollution'.  The goal of this research effort is to catalyze
development and implementation of innovative,  cost-effective environmental
technologies; develop scientific and engineering information needed by EPA to
support regulatory and policy decisions; and provide technical support and infor-
mation transfer to ensure effective implementation of environmental regulations
and strategies.

This publication has been produced as part of the Laboratory's strategic long-
term research plan.  It is published and made available by EPA's Office of Re-
search and Development to assist the user  community and to link researchers
with their clients.


                           E.  Timothy Oppelt, Director
                           National Risk Management Research Laboratory
      K                    EPA REVIEW NOTICE

     This report has been peer and administratively reviewed by the U.S. Environmental
     Protection Agency, and approved for publication. Mention of trade names or
     commercial products does not constitute endorsement or recommendation for use.

     This document is available to the public through the National Technical Information
     Service, Springfield, Virginia 22161.

-------
                                             EPA-600/R-98-040
                                             April 1998
                   Final Report
         Guidance for Landfilling Waste in
       Economically Developing Countries
                       By:

George M. Savage, Luis F. Diaz, and Clarence G. Gotueke
                 CalRecovery, Inc.
              725C Alfred Nobel Drive
             Hercules, California 94547

                       and

                  Charles Martone
                Roy F. Weston, Inc.
                  7 Eagle Square
           Concord, New Hampshire 03301
            U.S. EPA Contract 68-C4-0022

        EPA Project Officer Susan A. Thomeloe
      Air Pollution Prevention and Control Division
    NationalRisk Management Research Laboratory
     Research Triangle Park, North Carolina 27711
                   Prepared for

         U.S. Environmental Protection Agency
         Office of Research and Development
               Washington, DC 20460

-------
Abstract

This report offers guidance on all aspects of the planning and implementation of landfills in
economically developing areas. The intended audience includes municipal officials, as well as
solid waste managers, engineers, and planners.
Covered within the 18 chapters of the report is guidance on the siting, design, and operation of
landfills. Equally important, the social, economic, and institutional topics relevant to developing
landfills in economically developing areas are also discussed.

The guiding  principle of the report is the application of good landfill practices within the
conditions  and  availability of resources  prevailing  in  large  urban  cities  and  in  small
communities  in  economically  developing areas.   The guidance also considers a  common
occurrence in economically developing areas, namely that solid wastes and hazardous wastes
are disposed of together on the land.

While the preparation of the report was funded by the U.S. Environmental Protection Agency
(EPA), the content does not represent EPA regulations and policies.  The guidance reflects the
opinions of the authors, based in part on their experience, on modem landfill practice in the
United States,  and on  contributions made by the Working Group on Sanitary Landfilling
organized within the International Solid Waste Association.

-------
 Preface

 The preparation of the draft landfill guidance document was brought about through the
 cooperation of a number of organizations and individuals.  The basis of the document was one
 prepared several years ago by CalRecovery, Inc., under contract to  The World Bank.  The
 current document  contains substantial modifications to  chapters of the former document,
 includes coverage of additional topics, and reflects the content of course materials used by the
 International  Solid Waste Association's  (ISWA's)  Working  Group on  Sanitary Landfiliing
 (WGSL) during the  conduct  of  courses from 1993 to  1996 in  economically developing
 countries, on the topic, Landfiliing of Wastes. To date, the guidance  document has been an
 evolving document, benefiting from modifications of content based on the results of the
 courses given.
 Funding for the  preparation of  the   guidance  document was  provided  through  the
 Environmental Technology Initiative and  administered by the U.S.  Environmental Protection
 Agency (EPA),  as part of its U.S. Technology for International Environmental Solutions (U.S.
 TIES).  U.S. TIES is an innovative EPA program designed to promote the application of U.S.
 technology in solving environmental problems worldwide.  Additionally, in-kind services were
 provided by members of ISWA's WGSL and CalRecovery, Inc.

 Individual members of the WGSL who contributed material to the guidance document in the
 form of lecture  and class notes include: Oik Beker, The Netherlands; Geoffrey Blight, South
 Africa; Luis F. Diaz, United States; Derek  R. Greedy, United Kingdom; Robert K. Ham, United
 States; Anders Lagerkvist, Sweden; Rainer Stegmann, Germany; N.C. Vasuki, United States;
 and Isabella Paris, France.

The  draft document has been  peer-reviewed by members of the WGSL (Robert Ham,
chairman; David J.V. Campbelll; Isabella  Paris; and Rainer Stegmann).  Additionally, review
has been conducted by Susan A.  Thorneloe, Allen J. Geswein, Paul F. Cassidy, and David  A.
                                                                                  HI

-------
Carson, U.S. EPA; Lars M. Johannessen and Carl R. Bartone, The World Bank; and Forbes R.
McDougall, Procter & Gamble.

While the preparation of the document was funded by the U.S. EPA, the content is not meant
to and does not represent the EPA's regulations and policies. The content reflects the authors'
analyses and judgements concerning appropriate methods, procedures, and topics relevant to
land disposal of solid wastes in economically developing countries. The conditions relevant to
solid waste management in  economically developing countries are substantially different than
those of industrialized countries.

CalRecovery, Inc. performed the majority of the preparation of the guidance document, under
subcontract to Roy  F.  Weston, Inc. (Weston).  Weston contributed to the  preparation of
portions of the document,  including topics related to design, operation, and environmental
monitoring.
                                                                                   IV

-------
 Table of Contents


                                                                          Page

 Abstract	H

 Preface	»	iii

 List of Tables	x

 List of Figures	xii

 Chapter

 1.     Introduction	1-1

 1.1    Background	1-1
 1.2    Need for Guidance	1-4
 1.3    Objective	1-5
 1.4    Scope of the Guidance	1-5

 2.     Sanitary Landfill Fundamentals.....	2-1

 2.1    Introduction	.....2-1
 2.2    Generated, Diverted, and Disposed Wastes and
       Their Characteristics	2-2
 2.3    Waste Collection from Marginal Areas	....2-3
 2.4    Waste Disposal Sites	,2-3
 2.5    Principles of Landfilling	2-4
 2.6    Methods of Operating a Landfill	2-6
 2.7    Closing an Open Dump	2-8
 2.8    The Role of Scavengers	2-8
       References	2-9

 3.     Status of Landfill Legislation	3-1

 3.1    Introduction	3-1
 3.2    Australia (Perth, Western Australia)	3-1
 3.3    France	3-2
3.4    Guatemala	3-4
3.5    Japan   	:	3-6
3.6    Mexico	3-8
3.7    The Netherlands	3-9
3.8    Paraguay	3-10

-------
 Table of Contents (cont.)                                             £§fl§

 3.9    Peru    ...................................... . [[[ 3-10
 3.10  South Africa [[[ 3-12
 3.1 1  United Kingdom and the European Union [[[ 3-12
 3.12  United States [[[ 3-14
 3.13  Conclusions [[[ 3-15
       References [[[ 3-18
 4.     Waste Characterization
 4.1    Major Classes of Solid Wastes [[[ 4-5
 4.2    Types of Solid Wastes [[[ 4^7
 4.3    Methods for Determining Quantities and Characteristics
       of Disposed Wastes ....................................... . ............................................... 4-16
       References [[[ . ...................................... 4-32

 5.     Waste Diversion Impacts on Landfills [[[ 5-1

 5.1    Introduction [[[ 5-1
 5.2    Types of Diversion Programs and Impacts ................................ . ..................... 5-2
 5.3    General Impacts of Waste Diversion Programs ....... . ................. . ..................... 5-3
 5.4    .Estimation of Diversion Impacts on Landfills ..... . ............. ...... ........ . ........... .......5-4

 6.     Site Selection ..................... . .................. . ........ 7.'. ................ , .......... . .................. 6-1

 6.1    Non-Geological Aspects ............................ . .................................... . ................ 6-1
 6.2    Geological Aspects [[[ 6-12
 6.3    Proposed Classification System for Site Selection ........................................ 6-34
       References [[[ 6-40

 7.     Infrastructure [[[ „ ...... 7-1

 7.1    General [[[ 7-1

-------
Table of Contents (cont.)                                             Pace

8.     Design and Construction	8-1

8.1    Site Considerations	8-1
8.2    General Design Criteria	8-6
8.3    Types of Landfills	8-9
8.4    Cell Design and Construction	8-10
8.5    Landfill Contouring	8-17
8.6    Bottom Liners	8-18
8.7    Final Covers	8-30
8.8    Use of Earth Materials	8-38
8.9    Construction Quality Assurance	8-38
8.10   Groundwater Controls	8-42
8.11   Surface Water Management	8-43
8.12   Leachate Management	8-44
8.13   Landfill Gas Management	8-46
8.14   Provisions for Materials Recovery	8-47
8.15   Land Disposal of Hazardous Waste (Hazardous Waste Landfill)	8-48
8.16   Combined Disposal of Different Types of Wastes	8-53
8.17   Landfill Closure	8-55
8.18   Post-Closure Use of Site	8-57
       References	:	,	8-57

9.     Equipment Selection	9-1

9.1    Fundamental Considerations	;	„. 9-1
9.2    Selection  Factors	9-4
9.3    Key Usage Categories for Equipment	9-6
9.4   Types of Equipment	9-9
9.5    Inspection and Maintenance	9-23
9.6    Equipment Requirements	9-24
       Reference	9-26

10.   Operation	10-1

10.1   Introduction	10-1
10.2   General Procedures	10-1
10.3   Specific Operational Procedures	10-20
10.4   Performance Monitoring	10-30
10.5   Environmental Monitoring	10-35
      References	10-43
                                                                                 VII

-------
 Table of Contents (cont.)                                            Page

 1 1 .    Landfill Processes. [[[ 11-1

 11.1   Introduction .................. . [[[ 11-1
 11.2   Key Processes .......... . [[[ 11-2
 11.3   In-Place Density [[[ 11-11
 11.4   Settlement [[[ 11-12
       References [[[ 11-13

 1 2.    Leachate Formation and the Water Balance .............................................. 1 2-1

 12.1   Water Balance [[[ 12-1
 12.2   Leachate Migration [[[ 12-6
 12.3   Characteristics of Leachate [[[ 12-8
       References [[[ 12-10
 13.    Leachate Collection and Management Systems ........................................ 13-1

 13.1   Introduction [[[ : .................................. 13-1
 13.2   Identification and Selection of Liner [[[ 13-2
 13.3   Leachate Collection Systems..... ...... .......... . [[[ 13-2
 13.4   Leachate Removal and Storage ................................................ . ................ ... 13-6
 13.5   Management Alternatives [[[ 13-7
 13.6   Existing Unlined Landfills.... [[[ ..... . 13-11
 13.7   Summary .......................... .:. ........ . ...... .......... ...... .............. . ........................... 13-12
       References [[[ 13-13


-------
Table of Contents (cont.)                                             Page

16.    Management and Recordkeeping	16-1

16.1   Management Responsibilities	16-1
16.2   Performance Monitoring	16-7
16.3   Environmental Monitoring	16-10
       Reference	16-12

17.    Closure, Post-Closure, and Corrective Action	17-1

17.1   Introduction	17-1
17.2   Closure Plan	17-2
17.3   Post-Closure Plan	17-8
17.4   Costs of Closure and Post-Closure	17-9
17.5   Site Use/Development Issues	17-10
17.6   Closure of Dumps/Corrective Action	17-14
17.7   Landfill Mining and Reclamation	17-31
       References	•„	17-37

18.    Economic Considerations	,	18-1

18.1   Introduction	18-1
18.2   Potential Methods of Cost Reduction	18-3
18.3   Capital and Operating Costs	18-5
18.4   Costs Associated with Landfill Equipment	,...	18-10
       References	18-13

Appendix A.  Bibliography	.	A-1
                                                                                  IX

-------
 List of Tables


 Table                                                                  Page

 4-1.   Average Uncompacted Bulk Densities of Residential Refuse	4-9

 4-2.   Types of Wastes Representing Potential Risks arid Hazards
       When Received at Landfills	4-11

 4-3.   Quantity and Composition of Disposed Municipal Solid Waste	4-19

 4-4.   Average Composition of Various Types of Wastes Generated
       in Asuncion, Paraguay	~	4-19

 4-5.   Minimum Suggested Composition Categories	4-24

 4-6.   Estimation of Landfill Gas Production from
       Ultimate Analysis of Solid Waste	,	4-31

 5-1.   Examples of Impacts of Different Levels of Diversion on the
       Composition of Disposed Municipal Wastes	5-5

 5-2.   Examples of Impacts of Different Levels of Diversion on
       the Concentration of Lead Entering a Landfill	5-6

 5-3.   Examples of Estimation of Ultimate Analysis of Municipal Solid Waste	5-7

 6-1.   Porosity Ranges, Flow Types, and Saturated Hydraulic
       Conductivities of Various Soil Types	6-29

 6-2.   Proposed Classification of Landfills in Economically
       Developing Countries According to Size	6-38

 8-1.    Suggested Minimum Cell Widths as a Function of
       Daily Waste Quantities	8-14

 8-2.    Typical Uses of Earth Materials for Landfill Construction
       and Operation	8-39

9-1.    Approximate Earth Moving Capacities for Average Soils	9-20

9-2.    Suggested Equipment Requirements as a Function of
       Waste Generated	9-25

-------
List of Tables (cont.)                                                  Page

10-1.  Inclement Weather Practices	10-8

10-2.  Environmental Control Practices in Landfill Operations	10-10

12-1.  Runoff Coefficients for Different Soil Cover Materials
       and Different Vegetation Types	12-4

12-2.  Hydraulic Conductivity for Various Soils	12-7

12-3.  Summary of Leachate Characteristics from Municipal Solid Wastes
       (acid and methanogenic phases)	12-9

12-4  Example of Leachate Characteristics that are
       Relatively Independent of Landfill Phase	12-9

14-1.  Typical Composition  of Landfill Gas	14-2

14-2.  Trace Organic Compounds in  Raw Landfill Gas, Mountain View Landfill	14-3

17-1.  Typical Data Requirements for Corrective Action	17-18

17-2.  Corrective Action Alternatives  for Control of Surface Water Run-on	17-22

17-3.  Corrective Action Alternatives  for Erosion Control Problems	17-24

17-4.  Corrective Action Alternatives  for Control of Leachate Generation	17-27

17-5.  Corrective Action Alternatives  for Control of Leachate Migration	17-28

17-6.  Corrective Action Alternatives  for Control of Landfill Gas Migration	17-30

17-7.  Mass Balance and Efficiency in Stream Concentrations -
       Collier LFMR Demonstration Project	17-34

18-1.  Changes in Landfill Development Costs in the United States	18-2

18-2.  Individual Component Cost Relative to Total Landfill Cost	18-6

18-3.  Worksheet for Estimating Landfill Costs	18-7

18-4.  Summary of Landfill Development and Annual Costs
       in the United States	18-11

18-5.  Capital Costs of Landfill Equipment	18-12
                                                                                   XI

-------
 L/sf ofF/gures


 Figure                                                                    Page

 1-1.    Examples of Typical Solid Waste Disposal Sites
        in Economically Developing Countries	1-3

 2-1.    Key Aspects of a Sanitary Landfill	2-7

 2-2.    An Example of a Modem Landfill	2-7

 6-1.    The Geological Cycle	6-14

 6-2.    Examples of Permeabilities	6-17

 6-3.    The Water Cycle	6-18

 6-4.    Intergranular Porosity....;.,	6-21

 6-5.    Fissure Porosity	,	6-22

 6-6.    Karstic Aquifer	6-23

 6-7.   Schematic Example of Confined and Unconfined Aquifer	6-24

 6-8.   Recharge of Aquifers by Rain....	6-25

 6-9.   Depiction of Fluid Flow in a Porous Medium	6-26

 6-10.  Application of Darcy's Law	6-28

 6-11.  Risks of Surface Water Contamination	6-30

 7-1.   Examples of Truck Scales	7-6

 7-2.   Portable Litter Control Fence	7-9

 7-3.   Correct Positioning of Litter Control Fencing
       in Accordance with Wind Direction	7-10

8-1.   Trench Method  of Landfilling	8-11

8-2.   Area Method of Landfilling	8-11

8-3.   Illustration of Lift and Cell Structure of a Landfill	8-12
                                                                                     XII

-------
 List of Figures (com.)                                                Page
 8-4.   Example Illustration of a Canyon Fill	8-13
 8-5.   Ramp Method of Landfilling	8-17
 8-6.   Example of a Single-Liner System with Leachate
       Collection System Also Shown	8-20
 8-7.   Example of a Double-Liner System with a Leak Detection System	8-21
 8-8.   Example of a Segmented Liner Installation	8-24
 8-9.   Basic Final Cover Design	8-32
 8-10.  Components of a Complex Final Cover System	8-34
 8-11.  Illustration of a Drainage Layer Sloping to the Collection System	8-36
 8-12.  Groundwater Interceptor Trench	,	8-44
 8-13.  Ventilation Layer and Vertical Gas Vent	8-47
 8-14.  Cross-Section of a Hazardous Waste Landfill System	8-52
 8-15.  Illustration of a Hazardous Waste Landfill Facility	 8-52
 9-1   Bulldozer	,	9-10
 9-2.   Steel-Wheeled Landfill Compactor	9-11
 9-3.   Wheel Loader	9-13
 9-4.   Grader  	.'	9-18
 9-5.   Scraper	9-19
 10-1.   Typical Sequence of Operation	10-5
 10-2.   Unloading and Compacting Process	10-23
10-3.   Impact of Passes on Relative Landfill Density	10-24
10-4.   Relationship Between Thickness of Layer of Waste
       and Relative Average Compacted Density	10-25
                                                                                  xiii

-------
List of Figures (cont)                                                Page
10-5.  Machine Weight vs. Relative In-Place Density ............................................. 1°-25
10-6.  Example of a Groundwater Monitoring Well ................................. • ............... 10-38
10-7.  Typical Single-Screen Gas Monitoring Probe .............................................. 10-42
1 1-1 .  Characteristics of Chemical and Biological Processes
      Occurring in a Landfill [[[ •
12-1.  Various Components of a Water Balance for a Landfill ................................. 12-2
13-1.  Diagram of Piped Bottom Design [[[ 13-4
13-2.  Detail of Leachate Collection System [[[ 13-5
13-3.  Diagram of Sloped Terrace Design [[[ 13-6
14-1.  Dissipation of Landfill Gas Using a Porous Pathway Within the Fill ..... , ......... 14-6
14-2.  Dissipation of Landfill Gas Using an Interceptor Trench ...... ... ....................... 14-7
14-3.  Gas Collection Well ................................ : ............... . .............. . ........................ 14-9
14-4.  Schematic of Landfill Gas Dehydration System

-------
Chapter 1
Introduction

1.1    Background
The management of solid  waste in a  manner  that protects  the public  health and the
environment is a difficult task that requires substantial knowledge and experience. With regard
to the design and operation of landfills, many issues must be considered and resolved, and the
process  requires the efforts of many professional disciplines.  The intent of this guidance
document is that it provide a resource for designing and operating landfills that will protect the
public health and the environment, while accommodating the social, cultural, and financial
conditions that exist in economically developing countries.
In many economically developing countries,  limitations of technical and financial resources
adversely influence the ability to effectively and safely manage solid wastes. The results of
the limitations of  resources on the  ability to manage wastes  usually include inadequate
provisions for storage at the  point  of generation,  inefficient and  deficient collection, and
unsatisfactory final disposition.  The rapid growth of the population and  economy in many
economically developing countries, combined with the lack of training in modem solid waste
management practices,  further  complicates efforts to improve solid waste services.   Some
substantial improvements in waste management systems in economically developing countries
are being planned, or actually have been made, in the storage and collection of the Wastes.
On the other hand, improvements in disposal practices are very limited in extent.
Final disposal of urban wastes in many locations of the economically developing world usually
is a matter of transporting the collected wastes to the nearest available open space and then
discharging them (generally, no differentiation or distinction exists between the dumping and
commingling of municipal solid waste and hazardous wastes in a particular location, as is the
                                                                                   1-1

-------
 practice in some industrialized countries). The only attention given the dumped wastes comes
 from scavengers reclaiming items deemed useful, and from birds and animals in search of
 food.  In some instances, the wastes are purposely set on fire in order to  reduce their volume
 and to minimize the attraction of animals and vermin. These poor means of management lead
 to many problems, including pollution of surface and groundwaters, migration of combustible
 gas from the site, litter, odors, and breeding of disease carriers.  Photographs showing typical
 disposal sites in economically developing countries are given in Figure 1-1.

 In recent years, recycling, composting, and  incineration projects have  been proposed as
 methods of minimizing the use of land disposal of wastes. These alternatives  have been
 implemented in many industrialized countries on a substantial scale within the past 5 to 10
 years for the purpose of reducing dependency on land disposal. However, even practices that
 take advantage of material and energy recovery generate residues that must be disposed on
 the land.  A promising and  appropriate approach,  which currently  is gaining popularity in
 economically  developing  countries,  is to landfill the wastes with  the  goal of eventually
 improving the practice to a point at which it would merit the designation of a "modem sanitary
 landfill."  Sanitary landfilling (controlled disposal of waste on the land), especially if integrated
 with some type of material recovery, is well suited to economically developing nations because
 of the flexibility, relative simplicity, and cost of this method of final waste disposal. Additionally,
 in many economically developing countries, the solid waste has a high moisture content and is
 readily biodegradable;  consequently, landfilling  is an appropriate method of stabilizing the
waste. The readily degradable nature of the waste and the use of modem landfill practice can
also combine to provide potential benefits to the community in  terms of improving marginal
land to higher forms of land use and in terms of conducting sustainable landfill operations i.e
reuse of the same volume occupied by waste placed in the fill earlier in its lifetime.
                                                                                   1-2

-------
Figure 1-1.  Examples of Solid Waste Disposal
 Sites in Economically Developing Countries
                                                          1-3

-------
 1.2    Need for Guidance
 At present, the adoption and practice of landfilling in many municipalities in economically
 developing countries are impeded by the lack of reliable and practical information such as that
 compiled in a good guidance document specific to developing countries. This guidance makes
 every effort to fulfill this need by including, under one cover, explanations and descriptions of
 technologies and procedures proven appropriate in  practice.   Within  the document are
 summary explanations of underlying principles, as well  as clear and concise guidance for
 putting the technologies into practice.
 Currently, the  few available  documents  on  landfilling  in many economically developing
 countries are based on technologies and  practices suited only to conditions in, and to the
 requirements of,  industrialized  nations.   However, technologies and practices  suited to
 industrialized nations rarely can  be successfully transferred to developing nations without
 having been adapted to local, conditions.  This guidance document presents methods for
 planning and implementing landfills.  The methods that are discussed span the spectrum of
 landfill practice from complex, engineered systems designed for virtually complete control and
 containment of impacts to human health and  safety,  to less complex systems that can be
 afforded  particularly  by small  communities  in  economically developing  countries  while
 promoting acceptable control of the impacts of land disposal of wastes.

 The document presents suggestions for review and evaluation,  often  based upon  best
 engineering judgement.  The guidance is intended to be of sufficient breadth and generality to
 cover the wide  range  of conditions (technical,  regulatory, social, economic, institutional, and
others)  that exist in economically developing countries, and  not necessarily to provide rigid
rules to be applied in all circumstances.  The document will assist the  users in arriving at
decisions  in  a  logical, well-defined, and  well-documented  manner.   Comprehensive and
detailed engineering design and analysis are used only  in those cases where they are the only
                                                                                   1-4

-------
 manner of conveying  an important concept  Specific descriptions,  tables, sketches,  and
 drawings are used liberally in order to convey important concepts to the reader.  References
 are  cited  in  most chapters of the document should the reader wish to further explore a
 particular subject. The references have been selected while keeping in mind their accessibility
 to the readers. In addition, a listing of other pertinent publications is included at the end of the
 document, in Appendix A.

 1.3    Objective
 The primary objective of this guidance document is to provide those responsible for solid waste
 management with the  basic tools for the development,  implementation, and monitoring of a
 landfill.  Secondary  objectives are to  provide the information necessary to  make intelligent
 decisions on the degree of complexity of a particular landfill design, as well as its advantages
 and disadvantages, and to provide the steps required to  upgrade an open dump (uncontrolled
 disposal of wastes on land) to a sanitary landfill.  The information presented in the guidance
 document  recognizes  the  limited capital and  other resources in economically developing
 countries, and the impact that the limitations have on the ability of a country or community to
 plan and implement a sanitary landfill.

 1.4    Scope of the Guidance
 The  guidance  document discusses  the principal  aspects of planning,  constructing,  and
 operating a landfill.   The emphasis is placed on  conditions, technologies, and practices  that
 exist in economically developing countries.  However, the coverage is sufficiently broad to
accommodate the levels of industrialization found in the metropolitan areas of economically
developing countries.  The range of conditions covered in this guidance will provide for
minimum acceptable disposal  standards.  As urban  income grows and  cities urbanize,
                                                                                  1-5

-------
 operational capacity and budgets of sanitation departments may increase sufficiently to permit
 the imposition of more stringent design and operating standards on waste disposal.

 Typically, in  developing countries, solid waste includes types of wastes  that are normally
 considered separately as "municipal solid waste"  and "hazardous waste" in industrialized
 countries.  Both of these types of solid wastes are almost universally disposed at the same
 location in economically developing countries.  Also, in economically developing countries,
 liquid wastes and sludges are  also disposed,  in many instances, at locations where solid
 wastes are disposed.  Thus, the guidance document recognizes this fact and addresses these
 types of wastes, as well as municipal solid waste.  However, the emphasis of the guidance
 offered herein is  directed primarily toward municipal solid  waste  and  disposal facilities
 designed to accommodate that type of waste (i.e., landfills).

 The guidance document begins with a description of the fundamentals (definitions, principles)
 of landfilling and subsequently examines all of the aspects of the practice ~ from planning .to
 implementation.

 This document is written primarily for engineers, planners, and operating staff.  However,  it is
 also of utility to management and high-level public officials for the purposes of planning  and
 budgeting. Municipal officials, by virtue of a review  of this document,  can gain an awareness
 of the issues and complexities of landfilling and the importance of these facilities to managing
 solid waste in a manner that protects the public and the environment.

The guidance document has been prepared such that the design and operation of the disposal
site can be improved  as  additional capital and technical resources become  available.  In
addition, the document presents guidance applicable to a large number of small communities
throughout the world.  The  document  describes the design and operation  of very small
landfills, as well as the methodology for upgrading an open dump to a landfill.
                                                                                   1-6

-------
 Chapter 2
 Sanitary Landfill Fundamentals

 2.1    Introduction
 The development of the modem sanitary landfill has occurred in response to the shortcomings
 of the open dump as a method of land disposal of wastes.  The shortcomings include adverse
 impacts to both the environment and to human  health and safety.  Numbered among the
 advantages of sanitary landfilling as a method of land disposal over open dumping are the
 provision  of a barrier between the environment and the wastes, management and control of
 gaseous emissions from the decomposition of the wastes, and  collection and treatment of
 leachate.   Additionally, modem sanitary  landfill  practice  includes returning the completed
 disposal site to a similar environmental setting and acceptable and compatible land use, which
 in many situations can benefit the community. Waste disposal by the methods and procedures
 of sanitary  landfilling  achieves the  following: 1) contact between  solid wastes and  the
 environment outside of the landfill boundary is minimized, 2) access to the wastes by vectors
 (disease carriers) and rodents is substantially prevented, and 3) the wastes are concentrated
 and contained within a well-defined space.  Consequently,  not only  are the wastes contained,
 but their impacts on human health and safety and on environmental quality are managed and
 controlled.

 The quantities and characteristics of the wastes that are to be disposed are two of the more
 important factors that influence the design and operation of a sanitary landfill. As an example,
 for a given landfill capacity and set of  operating conditions,  the rate of disposal  of wastes
 determines the active lifetime of the landfill.  Also, the existence or future implementation of
waste recycling  programs influences the  quantities  of wastes  that ultimately will require
disposal.  Thus,  an analysis  of a landfill project requires that the existing and future rates of
 recycling be considered during the analysis. Given that one of the first items of consideration
                                                                                  2-1

-------
 in the design of a landfill is the rate of disposal, the following subsection discusses solid waste
 and the factors that influence the quantities that will be produced for disposal (i.e., disposed
 waste).

 2.2   Generated, Diverted, and Disposed Wastes and Their Characteristics
 The  quantities of solid wastes that will require disposal  are those that  remain  after any
 diversion  of materials from disposal has occurred  (e.g., after any recycling, composting of
 them).  Diversion of materials can occur at various places and times within the solid waste
 management system after the wastes have been generated and placed out for collection.  As
 used in this document, generated wastes are those that are produced  at the source of
 generation and are  subsequently set out for collection. Generated wastes exclude any wastes
 that are processed  in an environmentally acceptable manner within the generator's property.
 There are a variety of sources of generation.  Commonly, the main types  of generators  are
 referred to as residential, commercial, institutional, and industrial. In addition, there are several
 subtypes  of major sources.  For example, multi-family dwellers are a  subtype of residential
 generators,  and  markets are a  subtype of commercial generators.   Since  industrialized
 countries  have almost 100% collection coverage, the quantities of wastes  that are collected
 are  almost  equal to those generated.  On  the  other hand, in  economically developing
 countries, due to  a  variety  of  reasons, the quantities of waste collected generally  are
 substantially less than those that are generated.  This  situation must be considered when
 planning a collection and disposal system. Trends  in growth of population  and of commerce
 must also be taken into account when determining waste generation over a planning period.

After the wastes are collected, they can be  disposed or recycled.  Thus,  generated  wastes
equal the sum of disposed wastes and recycled wastes (or secondary materials).  The process
of landfilling, by  definition,  involves only wastes  that  are directed to final disposal,  i.e.,
disposed wastes.
                                                                                   2-2

-------
Additional discussion of diversion of waste from landfill disposal and the impacts of diversion
on disposed waste characteristics is provided in Chapter 5.

2.3    Waste Collection from Marginal Areas
Marginal areas are those that encompass populations that lack basic sanitation services and
exist outside of governmental control.   The populations of marginal areas are  sometimes
substantial in comparison to the formal community.  Regardless of their size, the populations of
marginal areas are centers of waste generation and, if their wastes are to be collected and
disposed,  the  quantities  must be  taken into  account during the  planning of  a waste
management system.

2.4    Waste Disposal Sites'
Two general types of waste disposal sites are the subject of this document landfills and open
dumps.  The majority of the document addresses landfill  practice.  However, references to
open dumps are made  throughout the  document and  a portion of the document describes
corrective measures for situations involving open dumps.  A landfill is differentiated from an
open dump in that the landfill is an engineered design, consisting of a variety of systems for
controlling the impact of land disposal on human  health and safety and on the environment.
An open dump is an uncontrolled system and has not been the  subject of an engineering
design.
For the purpose of this document, a waste disposal site is generally defined  to consist of that
portion of the site wherein wastes are buried,  as well as any surrounding properly within the
boundary of the site.  The surrounding property may serve  as a buffer, support landfill-related
operations and  facilities  (e.g., maintenance) or unrelated activities  (e.g., recycling depots), or
contain access routes and roadways.
                                                                                  2-3

-------
 2.5   Principles of Landfilling
 Accepted definitions of a modem landfill are based on the concept of isolating the landfilled
 wastes from the environment until the wastes are stabilized and rendered innocuous as much
 as possible through the biological,  chemical, and physical  processes of nature.  The main
 differences among definitions of a landfill involve the degree of isolation and the means of
 accomplishing it.  Isolation includes prevention of water from entering the landfill, as well as
 isolation of discharges directly from the  fill to the  environment.  The rate  and extent of
 decomposition of the wastes are a subcategory of the design concept of isolation. As opposed
 to the rate and extent of decomposition that occur in a fill that is designed to minimize intrusion
 of  water,  certain  designs and  operating  procedures  can be used  to  accelerate  the
 decomposition of the wastes, e.g.,  recirculation  of landfill leachate.  The benefits of these
 designs  (termed bioreactor or wet  cell designs) include less time to  reach  biological and
 chemical stabilization and leachate  of lesser strength.  Detracting features of these designs
 include the added complexity of the design and operations compared to landfill designs lacking
 systems to accelerate decomposition,

 In the case of industrialized nations, the degree of isolation considered necessary to protect
 the environment and human health and safety usually is much more than would be technically
 and financially practical in many economically developing countries.   In the case of many
 industrialized countries, the high level  of containment  requires a complex and expensive
 engineered system.

 Emphasis  must  be placed on the proper  use and application of the definition of a modem
sanitary landfill because in many developing countries, any final disposal site (either a dump
site or a controlled fill) is commonly referred to as a "sanitary landfill."  The use of the term
leads to confusion and skepticism, particularly among the public, and improper use can and
                                                                                    2-4

-------
does impede acceptance of improved sanitary conditions and the willingness to devote the
financial resources that are required.
In the 1960s and early 1970s, the definition of a sanitary landfill in the United States and other
industrialized nations  was  primarily prescriptive, calling for the engineered landfilling and
compaction of  wastes, followed by covering the fill with a  layer of soil  at the end of each
working day. During this period of time, the main distinction between a sanitary landfill and an
open dump was the daily covering with soil [1,2].
By the  closure of the 1970s, the definition of a landfill in the  United States was specified in
terms of performance requirements: a landfill is a land disposal site at which is employed an
engineered method of disposing solid wastes in a manner such that environmental hazards are
controlled  by spreading the solid wastes in thin layers, compacting the  solid wastes to the
smallest practical volume, and applying and compacting cover material at the end of each day.
Since then, definitions of sanitary landfilling practice  have been further expanded and modified
to call for the  installation of an impermeable liner, as well as provisions for  collecting and
treating the leachate,  for managing water in and around the fill, and for controlling landfill
gases.  Despite the expansions, however, all of the definitions include three basic types of
practices and requirements:

1.     consolidation of wastes into the working face; compaction of the wastes to conserve
       land resources; design and  operation of the fill to control settlement, to optimize the
       chemical and biological processes (e.g., for landfill gas recovery), or both;

2.     covering the wastes with cover material on a daily basis to control the risk of hazards
      from exposed wastes; and
                                                                                    2-5

-------
 3.     control or prevention of adverse environmental impacts of wastes disposed on land to
       soil, water, and air resources  and of their subsequent impact on public health and
       safety.
 In order to conform to the definition of a modem sanitary landfill, a landfill must meet the above
 three key conditions regardless of the  stage of economic development of the country in which
 the landfill is located.  However, meeting the three conditions may be  technologically and
 economically difficult or impractical in  several economically developing countries.  Therefore,
 the short-term, or immediate, goal should be to meet the conditions to  the extent possible
 under existing circumstances. The long-term goal should be to eventually meet all three of the
 conditions.   This approach is recommended since the benefits  associated with a modem
 sanitary landfill are realized only to the extent that a land disposal facility fully meets the three
 basic conditions. The most important condition is the prevention of negative impacts on the
 public health and the environment.

 A schematic diagram showing the basic conditions and key processes of a sanitary landfill is
 presented in Figure 2-1. A photograph showing a sanitary landfill is presented in Figure 2-2.

 2.6   Methods of Operating a Landfill
 The primary  methods of landfilling (e.g., area fill, trench fill) are described in the document.
 Regardless of the type of construction, the proper operation of the land disposal activity is one
 of the key aspects of modem sanitary landfill practice.  Modem sanitary landfills are operated
 as systems. Consequently, the management, monitoring, and evaluation of the operations are
 important elements of ensuring safe and environmentally sound practices.  Modem sanitary
 landfills commonly employ  heavy equipment and other types of  mechanical, hydraulic, and
electrical equipment (e.g.,  pumps,  blowers) that require training and skill to operate and
maintain in good operating condition.
                                                                                   2-6

-------
     Methane gas
     collection and venting
Groundwater
monitoring
well
Clay cap
     Active area
        Daily cover
             Leachate collection pipes
              Waste cell

                 Leachate collection
                   Figure 2-1. Key Aspects of a Sanitary Landfill
               Cover
               Small working
                  face
 Compaction
   of waste
                    Figure 2-2. An Example of a Modern Landfill
                                                                                2-7

-------
 2.7   Closing an Open Dump
 Modem landfill practices can be applied to the improvement or closure of an open dump.  The
 prevalence of open dumps in economically developing countries presents the opportunity to
 apply methods  of closing and maintaining land disposal sites that have  been developed for
 modem landfills after their active lives. The methods of engineering presented in the guidance
 document can  be  used to analyze and select alternatives for controlling or eliminating  the
 adverse consequences of open  dumps on both human health and  safety and  on  the
 environment. The alternatives include capping the dump or moving the contents of an open
 dump to a landfill.

 2.8   The Role of Scavengers
 Two types of scavenging are relevant to the planning, implementation, and operation of land
 disposal sites in economically developing  countries.  First,  the occurrence  of scavenging
 between the point  of waste generation and the disposal location influences the quantities of
 wastes that will be disposed.  Thus, this aspect of scavenging  must be taken into account
 during the process  of estimating waste quantities and characteristics.

 Second, scavenging is a widespread occurrence at existing land disposal  sites in economically
 developing nations (as  opposed to the situation  in most industrialized countries) and is to be
 expected at new disposal  sites unless policies and/or programs  are  implemented to prevent
 the practice.  Since scavengers  normally are part  of the  socioeconomic  structure,  their
 displacement from  a disposal  site  can have many direct and indirect consequences.  While
 unsupervised and  uncontrolled  scavenging  is detrimental to the health and safety of the
 scavengers, as well as personnel  operating the  facility,  the exclusion  of scavengers from
disposal sites is not necessary if their activities are managed and controlled.  The document
describes  the  impact  of  scavenging on  disposal  operations  and methods of  property
incorporating scavengers into the overall method of managing waste disposal.
                                                                                 2-8

-------
References

1.    Sorg, TJ. and H.L Hickman, Sanitary Landfill Facts, SW-4ts-70 (NTIS PB204-403),
      U.S. EPA, Solid Waste Management Office, Rockville, Maryland, 1970.
2.    Sanitary Landfill Planning,  Design,  and Operation,  Div. General  Engineering and
      Radiological Health, New York State Dept. of Health, Albany, New York, 1968.
                                                                                2-9

-------
 Chapters
 Status of Landfill Legislation

 3.1   Introduction
 A solid waste management strategy cannot be implemented without the support and guidance
 of a legislative framework.  Legislation should be carefully drafted and should include a series
 of ordinances and regulations aimed at managing the solid wastes.  The legislation should not
 only  include procedures  for controlling  emissions,   but  they   should  also  deal with
 methodologies for monitoring and enforcing the regulations. Ideally, the legislation would be
 succinct, fair, and cost-effective.  In addition, a thorough analysis of the potential impacts of
 the laws should  be carried out prior to their issuance  in terms of public health protection,
 environmental preservation, and overall influence on economic development.
 Following are brief descriptions of either current or draft legislation for some countries.

 3.2   Australia (Perth, Western Australia)
 The criteria for landfill management for Western Australia were first released as a discussion
 document in January 1992.  The final criteria were published in October 1993 [1], which take
 into consideration comments  on the  discussion document by government agencies, local
 government, private sector, non-government organizations, and the public.

 The criteria apply to all regulated landfills in the Perth metropolitan  area and other areas, as
 determined by the Executive Director of Public Health.

 The regulations for Western Australia are comprehensive and provide guidance for all aspects
 of landfill design  and operation.  As such,  suggestions are made  on buffer zones, general
 requirements (fencing, roads, pest control, fire  control, compaction, supervision, and others),
weighing, control of water contamination, and post-closure site management.
                                                                                   3-1

-------
 3.3   France
 The new French Environmental Protection Law was passed in July of 1992 [2]. This law has
 had a major impact on the content and management of landfills.  The new law reinforces two
 existing laws and makes an effort to reduce waste production and increase the value of waste
 by means of resource recovery, treatment of wastes whose value cannot be increased,  and
 storage of final residues (generated through waste treatment). The final disposal of the waste
 will be part of an integrated waste management plan, as the final step of the waste treatment
 hierarchy to be developed for each department and each region.

 Financing of this ambitious effort to manage the wastes occurs through a tax that is levied for
 each Mg (1,000 kg, 1 tonne, 1.1 ton) of municipal solid waste that is deposited in landfills.  The
 tax is collected by the French Environmental Agency (ADEME).  The funds collected through
 the tax are used to  develop  new waste management techniques to treat household  and
 commercial waste prior to final disposition.

 At the time the law was passed, estimates were that more than 95% of municipal solid waste
 was collected and treated in the country.  Similarly, the rate for collection and treatment of
 commercial wastes was relatively high. On the other hand, the approximately 80 million Mg of
 hazardous wastes generated in the country each year were not managed adequately.   The
 new law was aimed at improving the management practices for these wastes.

 The first steps  taken  by the legislators and the  operators of the  landfills were aimed at the
 security of the landfill.  Legislation is leading toward strict  technical requirements, particularly
those applicable to the selection of sites for landfilling municipal wastes.  The new legislation
clearly defines  the criteria for  site selection, particularly its geology and hydrogeology, and
requires  a minimum permeability and thickness of liners, as well as the management of
leachate and landfill gas.
                                                                                   3-2

-------
 Since it is difficult to predict the lifespan of the pollution potential of the confined wastes, the
 new  legislation is trying to limit landfilling to disposal of "final waste" and to allow the  final
 disposal in landfills of only the "safer" waste types. Thus, the new legislation introduces the
 concept of "final" waste. Final waste may or may not result from the treatment of raw waste.
 Final wastes are those wastes which can no longer be treated given the current technical and
 economic conditions.  Consequently, the characteristics of final waste cannot be definitively
 fixed since they will evolve as technology progresses.  According to the law, after the year
 2002, only final waste will be landfilled.
 The  law of  1992 requires the development of departmental and regional plans for the
 management and disposal of waste. The plans should be discussed and accepted by all of
 those who are involved in waste management at the local or the regional levels.
 The quantity and  composition of the waste which will be allowed to be landfilled will depend
 upon the decisions made for the structure of the regional plans and the solutions adopted for
 waste treatment.

 Three major categories of final waste can be identified: 1) final waste from hazardous waste,
 2) final waste from municipal solid waste, and 3) final waste originating from the treatment of
 municipal solid waste (MSW) incineration gases (i.e., fly ash).

 The law indicates  that fly ash from MSW incinerators has to be stabilized and has  to comply
 with a certain set of criteria before the materials can be  landfilled. In general, fly ash does not
 meet  the criteria  and, consequently,  it is  expected  that it  will  have to be  solidified  and
 stabilized.

The legislation has made an attempt to classify the different types of final waste  for MSW.
The MSW is divided into several categories based on their potential behavior in the landfill.
                                                                                    3-3

-------
 The law of July 1992 is expected to have a sizeable impact on the quantity and composition of
 the waste reaching the landfill.  At the present time, the majority of the waste  is either
 incinerated or landfilled. The new law will promote several options for waste treatment in order
 to reduce the quantity of waste intended to be landfilled and to reduce its organic content [3].

 3.4   Guatemala
 The primary environmental law in Guatemala is the Law of Protection and Improvement of the
 Environment. The Health Code is the main legal instrument regarding sanitary issues.  The
 Health Code assigns to the Ministry of Public Health and Social Assistance the responsibility to
 dictate the norms and regulations for the collection, treatment, and final disposition of solid
 wastes.  The Health Code, in turn, requires that municipalities in Guatemala adopt the norms
 dictated by the Ministry of Public Health and Social Assistance. The Guatemalan Municipal
 Code assigns the authority to the municipalities to establish,  modify, and deliver services for
 the collection and final disposition of municipal solid wastes.  In addition, the Municipal Code
 requires that the municipalities guarantee the efficient, secure, continuous, comfortable, and
 hygienic functioning of the solid waste management  service to the population.   In 1988,
 Decree 58-88 of the Municipal Code incorporated a series of articles that dealt with sanitation.
 Specifically, Article 31 indicates that public services will  be provided and administered through
 either  of two modalities:  directly by  municipalities and/or  by the private sector through
 franchises assigned in accordance  to the law.  In addition,  Article 40 indicates that the
 municipal corporation must provide sanitation services;  street sweeping;  as well as collection,
 treatment, and final disposition of solid wastes.

Guatemala's  constitution  also gives the right to, and requires  that every citizen actively
participate in, the planning, execution,  and evaluation of programs dealing with public health.
The requirements set forth by  the constitution are reinforced by what is  stipulated  by the
                                                                                    3-4

-------
 Health and Civil Codes, which requires every citizen to obey and fulfill the regulations related
 to public health.

 The Health Code, Municipal Code, and the Law for Protection  and Improvement of the
 Environment  establish administrative  sanctions.   On  the other  hand,  the Penal Code
 establishes judicial sanctions.   The administrative sanctions are  applied by administrative
 entities and the penal sanctions are applied by courts of law. The imposition of administrative
 sanctions has been difficult due to the dispersion of existing legislation and the duplication of
 responsibilities of the  various administrative entities.  In addition, the application of existing
 legislation is a difficult task, primarily due to the fact that current legislation is inefficient and
 ineffective.

 Several legal  instruments in Guatemala require  the development  and implementation of
 regulations to deal specifically with solid  waste  management.   Unfortunately,  thus far,
 regulations for solid waste management have not been developed.

 Constitutionally, Guatemala recognizes the fundamental right to health. Essentially everyone
 (the government,  institutions, and individuals) is obligated to look after the health of every
 citizen.   The regulation and  control of solid wastes has special importance because of the
 potential negative impact that  the wastes can have on public  health and the environment.
 There are several Guatemalan laws and  regulations which address the management  of solid
 waste in the country.

 The primary regulations of the national environmental law are: the Political Constitution of the
 Republic, the  Law of the Protection and  Improvement of the Environment, the Health Code,
 and the Municipal Code.

Specific regulations that deal with solid waste management have not been developed at the
national level.  For instance, municipalities do not have regulations aimed at controlling the
                                                                                    3-5

-------
 siting, design, construction, and operation of solid waste management facilities (e.g., transfer
 stations, recycling plants, and sanitary landfills).

 Environmental control of municipal solid waste services is the responsibility of municipalities.
 However, in most municipalities, the  selection of waste disposal facilities does not take into
 consideration  environmental  concerns  or  potential negative environmental and/or sanitary
 impacts.

 3.5   Japan
 The Waste Management and Public  Cleansing Law in Japan was enacted in 1970 and later
 amended in  1991.  At that time, the Ministry of Health and Welfare encouraged local
 governments to construct or retrofit their  waste treatment facilities.  Investments in waste
 treatment facilities were encouraged through subsidies from the central government.  The
 subsidy  program was  started in  1963  and is revised every five years.  Municipalities are
 assisted in their planning efforts through the publication of Technical Guidance  Documents,
 under the direction of the Ministry of Health and Welfare.

 Since the publication of the first guidelines for landfill facilities in 1979, the characteristics of
 the wastes disposed in landfills have changed substantially. In  addition, land suitable for the
 establishment of landfills has become more and more scarce.  New landfill guidelines were
 promulgated in 1988. Since then,  a new technical guidance document has been prepared.

 In 1989,  there were more than 2,300 landfills in Japan, which received approximately 34% of
the total MSW stream (including bulky waste).

Some of the fundamental policies of final disposal in Japan can be summarized as follows:

•      A landfill, as a rule, should be the  point of final disposal for waste.  Ocean dumping
       should be an exceptional alternative.
                                                                                   3-6

-------
 •     All waste can be disposed in a landfill.  However, some wastes must be processed
       before disposal in order to avoid environmental contamination or to be assimilated in
       the environment more readily.
 •     The types of wastes that can be allowed to be disposed in the ocean should be strictly
       restricted and should be processed prior to disposal.
 •     Disposal criteria for waste containing hazardous substances should be more stringent
       than those for non-hazardous wastes.
 Thus, in  accordance with the policies set forth in the previous paragraphs, criteria for waste
 disposal  were presented in the Enforcement Ordinance of the Waste Disposal Law.  The
 criteria were formulated in ordeiito achieve the following: 1) prevent surface and  groundwater
 contamination  by leachate;  2) encourage waste reduction and  stabilization prior to  land
 disposal by means of appropriate technologies; and 3) pursue sanitary landfilling by controlling
 odors, litter, and access to animals.
 The Waste Disposal Law requires that the owner or operator of a landfill site must operate and
 maintain  the site according to criteria set forth in the Mandate of the Ministry of Health and
 Welfare and Prime Minister's Office of 1977. This is also known as the "Mandate of 1977."
 The technical criteria require that landfill sites that receive MSW be equipped with a  perimeter
 fence, a notification board, embankment to contain the waste inside the site, a liner system (if
 necessary), leachate collection and treatment (if necessary), and surface water diversion and
 drainage  systems. In addition, the site  should be engineered such that slides and subsidence
 are prevented.
The Mandate of 1977 requires the following operational and maintenance procedures: control
 of litter and foul odor, fire control, disease vector control, fencing, updating of notification board
 as needed,  periodic inspection of embankment and liner system,  control of explosive gases,
                                                                                   3-7

-------
 maintenance of leachate and  drainage facilities,  monitoring of groundwater, run-on/runoff
 control, application of final cover, recordkeeping, and closure requirements [4].

 3.6   Mexico
 Currently, there is legislative framework for the management of solid wastes in Mexico at the
 federal, state, and municipal levels.  However, the standards and rules relating to the siting,
 design, construction, operation, and monitoring of sanitary landfills are not set out in adequate
 technical  detail.  Although the standards and  rules still are not sufficiently described and
 developed, the country has some basic ordinances concerning solid waste management and
 the deposition of municipal solid wastes on land.
 The laws define non-hazardous solid wastes, and assign responsibility for their management
 to federal and municipal entities.

 The laws also require that federal entities  issue technical  rules to regulate the collection,
 treatment, and final disposition of all types of solid waste.

 The General Law of Ecological Balance and Environmental Protection, published .by the now
 defunct Secretariat of Urban  Development and  Ecology (SEDUE) in  1988, repealed the
 Federal Law of Environmental Protection published in 1982, and provides more flexibility in the
 application of environmental  law on a  country-wide basis.   The  law initially establishes a
 limitation of responsibilities for both the federal government and federal agencies. Specifically,
the law establishes the responsibilities of the states and of the Federal District. Similarly, the
law defines  a series of criteria relative to prevention of soil pollution originated by  the poor
management of solid wastes.
                                                                                    3-8

-------
 The law attempts to prevent and control soil contamination by the final disposition of solid
 wastes in sanitary landfills and by authorizing installation and operation of confinement or
 deposits for solid waste.
 Practically every state has a law similar to that of the Federal government.  Specific articles
 assign responsibility to the state for the selection of sites for final disposition of solid waste.

 Only  a  limited  number  of  municipalities  have  regulations which  are  applicable to  the
 management of solid wastes.

 3.7   The Netherlands
 The first General Administrative order addressing landfills in The Netherlands was published in
 1980 [5]. This order provided the first set of instructions on how to operate a landfill. One of
 the most important aspects of this order was that the waste  had to be placed at least 0.5 m
 above the highest groundwater level.  In addition, the installation  of a  bottom liner was
 suggested but not required.   No  additional  technical  information was  supplied by  the
 instructions.                    ••••-•  ••*—•>••

 In 1985, the 1980 order was replaced by a new General Administrative order [5]. The most
 important modification in the new version was that a bottom liner was required  for landfills.
 However, no technical guidelines were provided for the construction  of the  liner.  It was
 suggested to use synthetic as well as natural liners.

 In March 1993, the Dutch legislation dealing with landfills changed considerably.  A new law on
 environmental protection and a new  General Administrative order on landfills were published
 [5]. The new order indicated that all landfills that were operated or opened after March 1,1995
 must meet new technical criteria and those landfills that were closed before March 1, 1995
would be required to meet the 1985 order.
                                                                                   3-9

-------
 Some of the more important technical criteria indicated in the new order deal with: 1) the use of
 a bottom liner system, 2) the application of a leachate drainage system, 3) the use of a control
 system to protect groundwater, and 4) the use of a composite capping system.  The latest set
 of criteria was elaborated in considerable more technical detail than the earlier set of criteria.

 3.8   Paraguay
 A draft set of national regulations has recently been prepared by the Ministry of Public Health
 and Social Welfare.  It is expected that the regulations will be approved and become  law in the
 near future.
 Section  IX of the regulations pertains  to the "sanitary" disposal of solid wastes  and  stipulates
 that it must be  conducted such that the  natural renewable resources are protected.  In
 addition, it is stipulated that disposal should be performed in accordance with the technology of
 the sanitary landfill.
 The proposed regulations  suggest minimum requirements for the  selection  of a site for final
 disposition of the solid wastes. In addition,  approval of the site requires the  submittal of a
 technical document which should address a number of items pertaining to siting.

 The draft regulations suggest that a landfill can be operated at the following levels:  controlled
 dump  site  (level 1),  basic sanitary landfill (level 2), medium sanitary  landfill  (level 3), and
 advanced sanitary landfill (level 4).  Each of the levels is defined and described.  The degree
 of sophistication in the requirements and design increases as the level increases.

 3.9    Peru
 The first regulations addressing sanitary landfilling were promulgated  in Peru  in 1964. The
 Sanitary  Code was amended in 1969 to include the potential of recovering resources from the
waste. Much later, the concept of "market8 was included for the first time in the area of solid
                                                                                   3-10

-------
waste management in the Environment Code, the law for private investment, and the Jaw for
the promotion of private investment in the field of sanitation.  These modifications establish
responsibilities in the waste management sector and allow the participation of the private
sector in the area.
The articles in the regulation are general in nature and deal with the preparation of plans by an
engineer, place the responsibility for collecting the wastes  on the  municipality,  require daily
collection, and indicate that collection vehicles should be  covered and that the number of
vehicles should be sufficient to satisfy the needs of the collection frequency.
The regulation defines a sanitary landfill as a method of final disposition of solid wastes on the
land, whose objective is to eliminate the nuisances and risks to public health and, through the
use of appropriate technologies in sanitary engineering, the  wastes are deposited in layers on
the  soil,  isolating them  from the environment at the  end of each day of operation or at
necessary intervals. The conditions that must be met for a disposal site to qualify as a sanitary
landfill are made  in very general terms, e.g., distance from the city, accessibility, wind direction,
and proximity to sources of water supply.  In addition,  brief descriptions are made of the  type
of soils that would be preferable, such as clay, and it is noted that the use of sand would
require thicker layers.
The regulations dealing with the design  and operation  of a  landfill indicate that only two
methods of landfilling would be acceptable in the country: the area and the  trench.   The
section addresses dimensions of layers and lifts for each of the types of landfills. This section
also indicates that the layers should be compacted and covered with a layer of soil each day.
The last layer of waste should be covered with a layer of soil within one week of completion of
the landfilling process.  Additional  suggestions are  made dealing  with  access to the  site,
fencing, special wastes, burning of waste, and other items.
                                                                                   3-11

-------
 The annexes consist of sketches describing the area and trench methods, including  the
 process of discharge and compaction.

 3.10  South Africa
 The rules for disposing of solid waste on land in South Africa were promulgated in 1994 by the
 Department of Water Affairs and Forestry in a document entitled Minimum Requirements for
 Waste Disposal by Landfill [6J.
 The primary  objective of the minimum requirements is to ensure that the most cost-effective
 means  are used to protect the environment, particularly the water regime,  and public health
 from both the short- and long-term adverse impacts of waste disposal.

 In order to facilitate the application of the standards to a wide range of existing waste disposal
 sites, the standards are based on a landfill classification system. The classification system is
 based on waste type, size of the landfill, and the potential to generate a significant quantity of
 leachate.                           .

 Some of the basic design components relevant to the minimum requirements include: cut-off
 drainage system, separation between waste body and the groundwater, underiiner systems,
 leachate and contaminated water  collection  systems,  provision of adequate covering, and
 stability of slopes.

 3.11   United Kingdom and the European Union

 3.11.1     United Kingdom
 The development of a sanitary landfill  in the United Kingdom begins with the need for planning
 permission. The first phase of the process is the  conduct of a detailed site investigation and,
 in most  cases, an environmental assessment.  Specific topics that must be addressed during
the first phase are: location (siting),  access, proximity to housing, geology, hydrology,  and
                                                                                 3-12

-------
hydrogeology.   During the planning process,  the landfill's operational  practices and  site
infrastructure  are generally described,  with  the  detail  provided  later during  the licensing
process.  The planning process is  open to public participation  and debate, whereas  the
licensing process is not Hence, the need for such detail at the planning stage, which takes
place at the local level. When the planning requirements are satisfied, the licensing process
can commence.  It is a prerequisite of any waste management license that planning approval
has been given.

The licensing provisions form part of the Environmental Protection Act  1990.  The waste
management licensing regulations were implemented in  1994, some four years after the act
received its Royal assent.  The Act generally specifies  which  issues  are to be covered by
regulations.  Regulations are subsequently  developed to technically  define the manner of
meeting the requirements of the legislation.
The license sets the standard expected of the landfill operator.  The operator then produces an
operations  plan  that conforms to the set of standards.   The  operations  plan  can be
subsequently revised, if necessary, to meet changes in conditions.

The license or permit is issued and regulated by the Environment Agency. Regular visits and
site inspections are carried out to ensure compliance.  The license remains in force until  a
completion certificate is issued.  The completion certificate is issued to the operator at the time
that the completed fill has reached  a stable  regime, a  date many  years after  the fill has
terminated acceptance of wastes. Long-term  monitoring of the site  is a requirement of the
license.

The regulations are supported by guidelines, some of which are mandatory and while others
are discretionary and for consideration only. In terms of the legislation, the guidance can be
placed in the following key categories:
                                                                                  3-13

-------
 •     landfill design construction and operational practice,

 •     licensing of waste management facilities, and

 •     landfill completion.
 New guidance is being prepared for the co-disposal of wastes (i.e., municipal solid waste and
 hazardous waste) and special types of wastes.

 3.11.2    European Union
 A number of European countries have formed an alliance known as the European Union (EU).
 The EU issues directives which set the standards for its member governments with respect to
 particular issues.
 Currently,  a  landfill directive  has  been drafted by the EU which incorporates many of the
 existing requirements of the United Kingdom legislation.   However, the directive contains a
 new element in terms of landfill  gas  emissions, namely control  of  methane generated  by
 landfills because of its contribution to global warming. In particular, the directive considers the
 reduction of organic carbon by treating the wastes prior to landfilling.  The directive also seeks
 to stop the landfilling of tires  and  the co-disposal (commingling of municipal solid waste and
 hazardous) of waste.

 3.12  United  States
 The United States Environmental Protection Agency (U.S.  EPA) promulgated the current set of
 landfill regulations in October 1991 [7].  The U.S. EPA views state and local governments as
the implementors of the various solid waste management  programs.  A discussion  of the
development and status of landfill regulations in the United States  prior to  1991 is given in
Chapter 2.
                                                                                  3-14

-------
 The landfill regulations provide national minimum requirements that each of the states must
 incorporate into its landfill permitting process.

 The municipal solid waste landfill regulations apply only to those sites that receive household
 waste or waste derived from households.  The regulations consist of six major components:
 1) location  restrictions; 2) operation; 3) design; 4) groundwater  monitoring  and corrective
 action; 5) closure and post-closure; and 6) financial assurance for closure, post-closure, and
 known corrective action.  Usually, each of the six components includes: 1) self-implementing
 design standards with which a landfill owner or operator in an approved state  must comply
 without deviation, and 2) flexible performance-based standards that allow for an unapproved
 state to accommodate facility-specific conditions.
 The U.S. EPA has been involved in several modifications to the landfill regulations, including
 developing new mechanisms for financial assurance and revised requirements for some small
 landfills. The EPA also published a companion rule that regulates landfill gas emissions from
 municipal solid waste landfills.

 3.13   Conclusions
 A general  review regarding the status of legislation and  regulations pertinent  to landfills in
 several countries around the world indicates that there is a serious gap between industrialized
 countries and economically developing countries regarding landfill legislation and  regulations.

 In response to legislation, regulations in those countries considered to be industrialized have
 evolved substantially during the last 30 years.  The regulations  are primarily  aimed at the
 protection of water resources.  However, during the last five years, some of the  regulations in
 industrialized  countries  have  been,  or  are  being, modified  to reduce  the  risks from
contamination associated with landfills by controlling the type and quality of wastes reaching
the sites.
                                                                                   3-15

-------
 On the other  hand,  a review of available materials  indicates that the  large  majority of
 economically developing  countries do not have  a set of regulations  directed  toward  the
 protection of the public health and of the environment.  Most of the countries do not have
 regulations at either the national or the local level.  Although municipalities have some health
 codes that were developed a number of years ago, these codes basically address the need to
 provide collection and disposal services.
 A  set of regulations  in and of itself is not sufficient to protect the public  health and  the
 environment.  The requirements of the regulations must be implemented and the  regulations
 must be enforced.  Some economically developing countries suffer from a lack of  regulations
 and, where regulations are in  existence, enforcement is generally lacking due to  insufficient
 motivation, human resources, financial resources, or a combination of these factors.
                           %
 Environmental regulations developed for industrialized countries have some influence on other
 countries.  Some proposed and existing.regulations in economically developing countries are
 patterned after those prepared for industrialized countries. One of the key requirements that is
 often taken from landfill regulations of industrialized countries is the specification of extremely
 low hydraulic permeability for landfill liner systems, with the attendant need in some cases for
 synthetic membrane liners.

 In some rare cases, modem regulations for solid waste management have been promulgated
 in economically developing countries.  Unfortunately, the regulations dealing with sanitation
 appear, in many cases, to have  been developed without careful consideration  of scientific
 issues  associated with the regulations.    In  addition,  the  regulations do  not  include or
 accommodate a number of important aspects, such as social, economic, and cultural issues.
 Furthermore, the regulations typically lack careful analysis  in order to determine the financial
impact due to their implementation. The regulations also lack the basic mechanisms for their
application and, consequently, they are neither obeyed nor executed.
                                                                                  3-16

-------
 In most economically developing countries,  the institutions responsible for the application of
 legislation relative to the management of solid wastes lack the human and financial resources
 to do so.  Furthermore, the disorderly production of judicial norms has resulted in jurisdictional
 overlaps and duplication of responsibilities.
 Whenever possible, existing relevant legislation should be to put into effect by promoting the
 preparation and  publication  of regulations specific  to  solid waste management.   The
 regulations should  address the following  issues  for  solid waste  systems  and  facilities:
 1) minimum  requirements  for  siting, design, and operation;  2) the  permitting  process;
 3) monitoring of the facilities; 4) enforcement of the rules and regulations; and 5) sanctions for
 not following the regulations.  Both  the legislation and the regulations should be developed
 based on sound scientific principles, and they should address social, economic, and similar
 issues.   The  legislation and  the  regulations  should  also  unambiguously identify  the
 institution(s) that would be responsible for implementation of the regulations and the means for
 obtaining the financial and human resources to perform the designated duties.
 Parallel to the development of the regulations, development of an institutional framework is
 necessary for conducting the various activities outlined by the regulations.
 In addition, it is necessary to develop and implement the mechanism for the active participation
 of the public in the planning, execution, and evaluation of solid waste management systems,
 as well as to clearly delineate  the  agency responsible for enforcing the regulations.  The
 responsible agency should be given a sufficient budget to perform its duties.
 Key legal issues  that  exist among  economically developing countries  with  regard to the
 management of solid wastes are summarized below:
•      Imposition of administrative sanctions against violations of the regulations has been
       difficult due to fractured legislation.
                                                                                   3-17

-------
 •      Current legislation relevant to solid waste management is inefficient and ineffective.
   "     - i .
 •      Regulations specific to all elements  of  solid waste  management  have not  been

       developed.

 •      Regulations dealing with  sanitation  issues have been  developed without  due

       consideration of scientific, social, economic, and other issues.

 •      Implementation of modem practices of sanitation is hindered by the lack of procedural

       mechanisms.

 •      Jurisdictional overlaps  result in duplication of responsibilities, obligations, and  work

       effort and substantial opportunities for no action.

 •      Institutions responsible  for the application and enforcement of legislation lack sufficient

       human and financial resources.

 •      Disorderly production of norms leads to Jurisdictional overlaps and duplicity.


 References

 1.     Health  Department of  Western  Australia, Criteria  for Landfill Management, Perth,
       Western Australia, October 1993.
2.     International Solid  Waste Association, Working Group  on Sanitary Landfills, New
       French Policy on Landfills, Newsletter Volume 1, No.  2,1993.
3.     Valentis, G., F. Weber, V. Kopp, and T. Gosset, "Implications of French Policy of Waste
       Management on Landfilling Practices," Proceedings, 25th ISWA Congress,  Vienna,
       Austria, 1995.
4.      Ikeguchi,  T., "Progress in  Sanitary  Landfill Technology and Regulations  in Japan: A
       Review," Waste Management & Research, 12(4), April 1994.
5.      Stax, A.B.M., "Landfill Guidelines in The Netherlands," Proceedings Sardinia 95, Fifth
       International Landfill Symposium,  Volume III, Cagiiari, Sardinia, Italy, October 1995.
                                                                                  3-18

-------
6.     Bail, J.M., L. Bredenhann, and G.E. Blight, "Applications of Minimum Requirements for
       Landfill Design in Southern Africa," Proceedings Sardinia 95, Fifth International Landfill
       Symposium, Volume III, Cagliari, Sardinia, Italy, October 1995.
7.     Federal Register, Part II: Environmental Protection Agency, 40 CFR Parts 257 and 258,
       Solid Waste Disposal Facility Criteria; Final Rule, October 1991.
                                                                                3-19

-------
 Chapter 4
 Waste Characterization

 The successful design and operation of a landfill requires careful planning and attention to
 detail.  One of the more important and earlier activities of the planning sequence is the study
 and description of the wastes to be landfilled.  In this chapter of the guidance document, the
 planning process is limited to a discussion of waste quantities and characteristics, and to the
 acquisition of information concerning them.  Other chapters of the document discuss aspects
 of planning as they are encountered in relation to other topics covered in the document, e.g.,
 site selection, and design and construction.  This chapter is dedicated to waste quantities and
 characteristics because their influence is pervasive throughout the planning, implementation,
 and operation of a landfill project.
 A discussion of waste characteristics necessarily includes the use of terms and definitions to
 describe the wastes.  Unfortunately,  no set of universal terms and definitions exists as of this
 writing. Since in several cases a number of definitions are used to describe similar types of
 waste throughout the world, the  terms and definitions used in the guidance document should
 not  necessarily be considered  absolute.  An attempt has been made to provide  sufficient
 information  with respect to types of wastes and their characteristics so that the readers can
 property interpret and use  the information that is presented in the guidance  document and
 apply it to their local situations and conditions.

 Waste characterization is a broad topic.  It includes type; quantities; rate of unit generation;
 and  physical, mechanical, chemical, and biological properties  of  wastes.   Of immediate
 importance to the designer and operator of a landfill are the quantities and characteristics of
the waste to be disposed.  However, because quantities and characteristics vary over time, an
awareness and knowledge of the dynamics of waste generation must be had by all involved in
                                                                                   4-1

-------
 a landfill project  As discussed in Chapter 2, generated wastes are the sum of disposed
 wastes and diverted wastes (i.e., recycled materials).
 Two general types of waste diversion are applicable to economically developing countries,
 namely informal and formal.  Informal diversion, the existence of which is a matter of survival
 to some poor populations, is not officially sanctioned by the government; lacks controls with
 respect to protection of human health and safety and of the environment; and usually consists
 of scavenging (salvaging) at some point on the collection route, at the disposal site, or both.
 Formal waste diversion programs are sanctioned by the government and can range from
 simple recycling programs  (e.g.,  drop-off of recyclable materials at communal depots) to
 complex systems (e.g., separate collection of recyclable materials using especially dedicated
 vehicles).   Scavenging  is an important aspect  of  solid  waste  management  in  many
 economically developing countries and, therefore, it is given a separate and detailed treatment
 in Chapter  15.  If informal  scavenging is  upgraded to  organized, controlled,  and managed
 activities, then scavenging can fall within the definition  of formal  diversion, as used.in this
 document.  Generally, when used in this document, waste diversion refers to formal programs
 and systems of diverting wastes from land disposal.

 A knowledge of the quantities and characteristics of the wastes to be landfilled is fundamental
 to the proper design and  operation of a landfill.   Among other things, these parameters
 influence or control many aspects of the landfill system  over its lifetime, including the annual
 rate of filling, the required volumetric capacity of the  fill,  production and characteristics of gas
 and leachate, and environmental impacts.

 The quantity of solid waste dictates several  critical aspects of landfill  design  and operation,
 including number and frequency of vehicles using the site, land area required,  and amount of
 cover material that will be used.  Similarly, the composition and other characteristics of the
wastes significantly  influence the number of passes needed to achieve a particular degree of
                                                                                   4-2

-------
compaction and the types of heavy equipment needed for the landfill operation.  The physical,
mechanical, chemical, and biological characteristics of the wastes, along with the operational
conditions at the landfill,  govern the performance of the various processes (e.g., compaction,
anaerobic decomposition, and hydraulic transport) that occur in a landfill and ultimately govern
the fate (e.g., settlement, rate of decomposition, and products of decomposition) of the wastes
as they are subjected to these processes.

Disposed waste quantities and characteristics (and, therefore,  landfill design, operation, and
performance) can  be influenced or controlled by programs that divert certain components or
materials from the  generated waste stream.   The reasons  for the implementation and
maintenance of formal diversion programs are many. They include the recovery of valuable
resources that would otherwise be disposed as wastes, the reduction of problematic materials
entering a landfill and the subsequent adverse effect that they have upon landfill operation and
performance (e.g., whole tires, toxic materials), and the reduction of the quantities of materials
destined for land disposal in  order to conserve resources, e.g., land, and water and air quality.
From the  standpoint of planning,  designing,  and  operating  landfills,  an awareness and
understanding is needed of:  1) the  distinction between the characteristics of disposed wastes
and of generated wastes; 2) the potential impacts of diversion  programs on disposed waste
characteristics;  3) the potential temporal variation in the effects of diversion programs and in
disposed waste characteristics; and 4) other factors that influence waste characteristics, e.g.,
seasonal effects.

Because waste diversion programs may  be beneficial both financially and environmentally,
they are  being implemented  in many industrialized countries and in some  economically
developing countries.  Whereas in the past, the characteristics and quantities of disposed
wastes could be assumed to be identical or very similar to those of generated wastes, the
situation has changed  and is changing substantially around the globe.  Currently,  in some
industrialized countries, the extent of diversion programs is such that a substantial portion of
                                                                                  4-3

-------
 generated wastes is being diverted (25% diversion is the national average in  the  United
 States), and the characteristics of the wastes destined for disposal are significantly different
 than those of the generated waste stream.  Diversion programs currently are implemented over
 an extended period  of time (e.g., years),  due to the number of different programs that are
 required to achieve large percentages of diversion. Thus, their impacts on the disposed waste
 stream can be expected to range from initially modest to eventually substantial. Planners and
 designers of landfills must consider this dynamic condition, its magnitude, and its ramifications
 on landfill design and operation.
 Other influences on disposed waste quantities and characteristics include climate and season;
 level of economic development; occurrence of special or extraordinary events (e.g., tourist
 seasons); acts of nature (e.g., monsoons or fires); and type and number of waste generators
 (e.g., residential, commercial, and industrial).
 Four general trends  concerning solid waste generation in economically developing countries
 are worthy of consideration when conducting  long-term planning for land disposal of wastes.
 First, per capita waste generation increases with an increase in degree of national economic
 development. Second, an increase in the generation of paper wastes (particularly packaging)
 generally accompanies a nation's advancement in economic status.  Third, the concentration
 of putrescible materials in municipal waste decreases with the advancement of a  nation's
 economic status.  Finally, the bulk density of  solid waste decreases with increasing levels of
 economic development, from 400 to about 200 kg/m3, because of the lower concentration of
 paper and paper products and the greater concentrations of ash and food wastes.

This chapter describes the following:

•      the major classes of municipal solid  wastes found in. economically developing countries,
                                                                                   4-4

-------
•      types of wastes that should be either accepted or not accepted for disposal in a landfill,
       and

•      methods for accurately determining quantities and characteristics of the waste.

4.1    Major Classes of Solid Wastes
Traditionally, municipal solid  wastes generally have been classified in terms of three major
sources of generators: residential, commercial, and  industrial.   Sometimes, institutional
sources are separated from commercial sources and, thus, a fourth source is referred to as
institutional.   In the traditional scheme of classification, residential (domestic) solid waste
consists of household  garbage and rubbish, or refuse.  The garbage fraction is mostly in the
form of wastes derived from  the  preparation and  consumption of food  (e.g., meat and
vegetable scraps).   An alternate term commonly used to describe the garbage fraction is
"putrescibles."  In the traditional scheme, all wastes not classified as "garbage" are classified
as "rubbish." The major constituents of rubbish are:

•      glass, metal, and plastic wastes;

•      wastepaper and paper wastes; and

•      yard and garden debris.  .

As used in this document, the composition of yard and garden debris, or wastes, includes tree,
brush, and bush trimmings, lawn clippings, leaves, and plant debris from  gardens.  These
materials are characteristically readily  biodegradable under suitable circumstances.   In some
localities, yard and garden debris are termed "green wastes."
                                                                                   4-5

-------
 Other constituents historically (and currently) comprising a substantial portion of the solid
 waste streams of industrialized countries include automobiles, appliances ("white goods"), and
 construction and demolition debris.
 The list of waste constituents currently in use in industrialized nations is much the same as the
 traditional list, except that the major categories have been subdivided into many subcategories
 of material types (e.g., paper and paper products are subdivided into corrugated, newspapers,
 magazines, office grades, etc.) due to the interest in recycling and the environmental impact of
 particular types of materials (e.g., household hazardous wastes, lead acid batteries). Biosolids
 (municipal wastewater treatment sludges) are also receiving attention because they are of
 municipal origin, can be considered solid waste if adequately dewatered, and are frequently
 land-disposed.  In the case of some economically developing countries, a solid waste class of
 prominence may be agricultural solid waste (e.g., crop residues) and manures.
 Residential wastes are generated by single- and multi-family residences.  In economically
 developing countries, domestic waste contains substantial percentages of putrescible matter
 and ash.  The ash is generated by cooking and heating with solid fuels (e.g., peat  and wood).
 Commercial wastes are produced by retail and wholesale businesses, offices, and  light
 manufacturing facilities.  Institutional wastes are generated by government offices, schools,
 correctional facilities,  etc.    Industrial wastes  are produced  by  industrial  plants, heavy
 manufacturing operations, and others.

A significant portion of commercial  and industrial wastes in economically developing countries
is in the form of materials that have value and uses locally, e.g., paper and  paper products,
scrap metal, plastic,  and textiles.  Through the activities of scavengers and recyclers,  a
significant fraction of the commercial and industrial wastes are removed from the waste stream
before they reach the land disposal site.
                                                                                   4-6

-------
4.2   Types of Solid Wastes

4.2.1     Significance of Type of Waste
The characteristics of the solid waste to be  disposed are important considerations in the
design and operation of a landfill. The nature and composition of the solid waste buried in the
fill are important determinants of the types, quantities,  and characteristics of the by-products
emitted as a  consequence of the processes occurring within the landfill and of appropriate
methods of handling the waste.  For example,  concerning the handling of wastes, a particular
type  of waste due to its corrosivity, toxicity, or  other dangerous property might require special
handling in order to  protect operating personnel and equipment from injury and harm.  An
example of the importance of the type of waste to landfill operations is wastes containing a
substantial concentration of low-density materials, e.g., plastic film and foam.  Such wastes
require skillful handling and processing at the  land disposal facility if proper compaction and
control of litter are to be achieved.

4.2.2     Acceptable Wastes
Most  solid wastes  generated by  residential  (domestic), commercial,  institutional, and
agricultural sources usually can be disposed in a  modem sanitary landfill, with minimum risk of
directly or indirectly endangering human health and safety and the quality of the environment.
For convenience  of  reference, such wastes are discussed  under  the term "Acceptable
Wastes."  This blanket generalization does not extend to solid wastes generated by industrial
sources. Solid wastes from industrial generators should be examined carefully to assess their
characteristics and whether or not such wastes  require skillful and special methods of land
disposal.  The scrutiny of solid wastes from industrial sources is particularly  important and
necessary in those locations in which policies or regulations for hazardous waste management
and their enforcement are non-existent or inadequate to control the quality of solid wastes that
may enter or are entering a solid waste landfill site.   Under the definition used in this
document,  landfills are not designed to accept and process substantial quantities of hazardous
                                                                                    4-7

-------
 wastes.   Large quantities  of  hazardous wastes  must be  disposed in  specially  designed
 landfills.  Further discussion of hazardous wastes is presented in  the  subsection entitled
 "Unacceptable Wastes."
 Ideally, only those wastes for which a given facility has been specifically designed should be
 accepted by that facility.  An exception might be a waste that has been shown to fit within the
 existing  or appropriately modified  design  capacity of the facility  and has  the  appropriate
 physical, biological, and  chemical characteristics.  In many of the economically developing
 nations, separation of wastes  into acceptable and unacceptable or  other categories  is not
. practiced. In many economically developing countries, circumstances are likely to be such that
 the only feasible course of action for disposal  is to accept and bury all wastes without
 exception.  The very act of removing the wastes from the open environment and placing them
 in a controlled environment would represent a substantial advancement over the  past and
 current practices  and  conditions of  waste  management and  disposal.    Under  such
 circumstances, control of the potential adverse impacts of the joint disposal of solid waste and
 hazardous waste on  human health and the environment would be exercised through the
 proper siting, design, and operation of the land disposal facility.

 In general, wastes that can be regarded as being acceptable for disposal in a landfill are solid
 wastes generated by residential and commercial sources,  and dewatered sludges (excepting
 raw sewage sludge) from wastewater treatment and from water supply treatment facilities.  Of
 these types  of wastes, the  greater portion will be in the form of residential and commercial
 solid wastes.  The average  uncompacted  bulk densities for residential refuse generated in
 various cities is presented in Table 4-1.
                                                                                    4-8

-------
         Table 4-1. Average Uncompacted Bulk Densities of Residential Refuse
                Location
Density
(kg/m3)
                Metro-Manila, Philippines
                Lima, Peru
                Caracas, Venezuela
                Asuncion, Paraguay
  209
  176
  220
  390
              Source: Reference!

 Certain wastes that might otherwise be designated as unacceptable can be accepted for
 disposal at a landfill if they  are subjected to the handling procedures and conform to the
 conditions described in Section 4.2.4.  Among such types of wastes are included bulky wastes
 (furniture, large appliances, tires, automobile bodies), animal carcasses, hospital and medical
 wastes, and residues generated by incinerators and air pollution control  systems.   These
 wastes rarely are found in the small municipalities of economically developing countries.  On
 the other hand, these types of wastes can be found in large metropolitan areas.
                                    «•
 4.2.3      Unacceptable Wastes
 In the absence of a formal system of hazardous waste policies, regulations,  and enforcement,
 the decision as to which  solid wastes are to be considered unacceptable for disposal in a
 landfill should be made mutually among  the waste generator,  the responsible  government
 agency, and the disposal site designer or operator.  Unacceptable wastes should be identified
 in the landfill development plan, and the users of the  site should be provided with a list of such
wastes. Considerations regarding the acceptability or, conversely, unacceptability of specific
classes and types of wastes should include the hydrogeology of the site; the  quantities and the
physical, chemical, and biological characteristics of the wastes; alternate methods available for
processing and disposal; risks and effects  of the wastes to the environment and to the public
health; and the protection of the health and safety of the operating personnel [2].
                                                                                   4-9

-------
 Particular types of wastes that should require specific approval of the responsible government
 agency for acceptance at the disposal site include hazardous wastes, hospital and medical
 wastes, bulk liquids and semi-liquids,  sludges containing free moisture, highly flammable or
 volatile substances, raw animal manures, septic tank pumpings,  raw sewage sludge, and
 industrial  process wastes.  Animal wastes should be evaluated  in light of the fact that some
 animal wastes may be infectious because they contain animal disease organisms that can be
 transmitted to humans (zoonoses). Some types of wastes that represent potentially significant
 hazards and risks are listed in Table 4-2. The terms used in the table to describe the potential
 risks and hazards among the various types of wastes are meant to provide the reader with a
 general notion of the types of problems that might be encountered in the handling and disposal
 of the wastes.  The terms have specific definitions and meanings in legislation and regulations
 promulgated in some countries.
 A definition of hazardous waste that is appropriate for economically developing nations is the
 following:
       A  waste is hazardous if it poses a substantial present  or potential hazard to
       human  health or living organisms because the waste  is non-degradable or
       persistent in nature,  because it can be biologically magnified,  because it can be
       lethal,  or because  it  may  otherwise cause or tend  to  cause  detrimental
       cumulative effects.

4.2.4     Special Wastes
Some special types of wastes (hereafter referred to as "special wastes") are described in this
section. Of these, the hospital and medical (infectious) wastes and the sludges generally are
encountered  more  frequently (in terms of concentrations and degree of danger)  at  land
disposal   sites  in  economically  developing   nations  than  in  industrialized   countries.
Consequently, attention is  given  to them in this  document.   Special wastes generated in
                                                                                  4-10

-------
                    Table 4-2. Types of Wastes Representing Potential
                      Risks and Hazards When Received at Landfills
Waste Type
Solid Wastes
Putrescibles
Bulky Combustibles
Bulky Non-Combustibles
Small Combustibles
Small Non-Combustibles
Non-empty Cans, Bottles,
Drums
Gas Cylinders
Powders and Dusts
Pathological Wastes
Sludges
Demolition and Construction
Abandoned Vehicles
Radiological Wastes
Liquid Wastes"
Wastewaters
Contaminated Waters
Liquid Organics
Tars
Slurries
Gaseous Wastes"
Odorous
Combustible Particulates
Organic Vapors
Acid Gases
General Type of Risk or Hazard"
Toxicity


V


v
.
V
V
V
V
•


V
V
V
V
V

V

V
V
Explosiveness/
Flammability

V
V
V
V
V
V
V


V
V




V
V


V
V
V
V
Pathogenicity
V




V


V



•

V

V







Radioactivity





V .


V



V

•
. V








"   The terms may have specific definitions and meanings in legislation and regulations promulgated in
    some countries.
"   Final disposal of these wastes in a landfill requires an initial transformation to a solid form or
    alternate methods of final disposal.
                                                                                       4-11

-------
 economically developing countries other than hospital and medical wastes and sludges are
 usually good  candidates for scavenging  and recycling (e.g., construction and  demolition
 wastes) during collection and at the disposal site, a characteristic activity of economically
 developing nations discussed in greater detail in Chapter 15.  In some  countries, the term
 "special waste" has a specific meaning and definition in terms of the specific sources or types
 of wastes and their characteristics.
 The design and operation of land disposal  facilities for the special types of waste described in
 this section should be governed by the fact that some of these wastes can pose substantial
 risks and hazards to operators and to the public (both short and long term)  and  to the
 environment  Alternate  methods of treatment and disposal may be worthy of consideration in
 some cases.               -.•?•
 4.2.4.1    Sewage Sludge
 Sewage sludge (biosolids) refers to the concentrated settleable solids of sewage generated as
 a by-product  of  the processing and treatment of  municipal wastewater.  A  wastewater
 treatment facility  may serve  residential, commercial,  and industrial septic  tanks and public
 latrines.  In economically developing nations,  conventional municipal wastewater treatment
 facilities generally are found only in connection with the  sewered sections of large and well-
 developed metropolitan  areas:   Consequently, the issue of disposal of sewage sludge in a
 landfill would arise only for the landfill operations that serve those areas.

 Raw (primary) sewage sludge and septic tank and latrine sludges should  not be accepted for
 disposal at landfills because of the grave  risk  posed to  human health, especially the landfill
 personnel. The grave risk is the consequence  of handling and processing a material with the
 dense concentrations of human  pathogens that are characteristic of such  sludges.  Treated
 (secondary or digested)  sludges may be accepted at a landfill if they have been dewatered to
a solids concentration of about 15% or more and if they are  mixed with mixed solid  wastes
                                                                                  4-12

-------
(sometimes the process of jointly disposing both liquid and  solid wastes is termed "co-
disposal," or "combined disposal") such that the moisture content of the mixture is less than 50
to 60%.  The immediate application of soil cover is recommended after combined disposal to
isolate the mixture from the ambient environment.

Among the considerations of importance in the disposal of municipal wastewater treatment
sludge in a landfill are the moisture content of the as-delivered sludge; the ratio of solid waste
volume-to-sludge volume required to adjust the moisture content to the recommended range;
the degree of treatment accorded the sludge; and, in some areas, the metals content in the
sludge.  Concentrations of heavy metals above trace levels may place a particular sludge in
the hazardous waste category or otherwise warrant treatment of the sludge by methods other
than disposal  in a landfill. The potential of high concentrations of metals in the sludge would
be indicated in those areas where large industries (such as manufacturing) which conduct no
on-site  wastewater treatment and which are served by a municipal wastewater treatment
facility.   Prior  to allowing the disposal of municipal wastewater treatment sludge at a  landfill,
alternate methods of management should be evaluated. Alternatives are biological oxidation,
lagooning, and composting.
4.2.4.2    Industrial Process Wastes
A wide variety of chemical, physical, and biological characteristics are represented in the
residues produced by industrial processes. Among the forms of the industrial wastes that may
be delivered to a landfill  are liquids, semi-liquids, films,  sheets, granules, shavings, turnings,
and powders.  The wastes may be of any shape and particle  size. Combined disposal with
relatively dry, absorbent solid waste (paper, sawdust) is recommended for wastes composed
primarily of non-hazardous liquids and semi-liquids.
4.2.4.3    Volatile and Flammable Wastes
Wastes in this category include explosives, volatile liquids and gases, and petroleum fuels.
Because they  can be hazardous and result in fires, these wastes must be subjected to strict
                                                                                 4-13

-------
 control procedures. If the wastes are not highly flammable or volatile, they may be mixed with
 other wastes.  As a precautionary measure, however, all wastes in this category should be
 disposed in a separate area of the site.  The area should be clearly indicated and the exact
 location should be recorded in the final plan of the completed site.  Open flames should not be
 allowed in the vicinity of such wastes.  Moreover, workers should be warned against smoking
 in the vicinity.
 4.2.4.4   Bulky Wastes and Construction and Demolition Debris
 Bulky wastes include a wide variety of materials and items.  Automobiles, large household
 appliances and Fixtures, and oversize items in construction and demolition debris are common
 examples of bulky waste generated in industrialized countries.  Scavenging and recycling
 sharply reduce the quantity and concentration of such items reaching the disposal sites in
 economically developing countries.  Those that do reach the site generally are the subject of
 further scavenging and recycling  activities.   With  respect to  the items  that  survive the
 scavenging and recycling activities, special  procedures should be  followed in disposing of
 them.   Long, diffjcult-to-handle items  such as logs, stumps, and usable lumber should be
 placed parallel to the working face and covered with a layer of mixed municipal solid waste.
 Wastes that could damage vehicles (e.g., heavy-gauge wire, pipes, cable, scrap metal) should
 be deposited at the base of the face  and covered with mixed  solid waste or other suitable
 material prior to compacting them.
 4.2.4.5    Animal Manures
 If  animal  manures (such  as those from slaughterhouses serving  highly urban areas) are
 accepted at the landfill, they should be compacted on the working face in the  conventional
 manner and  covered immediately.  Excessively wet manures should be mixed with solid
wastes in a ratio that ensures no free water. The manures or mixture of manures should be
covered immediately after placement in the fill.  An alternate form of management of animal
                                                                                 4-14

-------
manures sometimes practiced in economically developing countries is to use the material
before or after composting it as a soil amendment or for land reclamation.
4.2:4.6   Animal Carcasses
Carcasses are best disposed at a rendering plant.  Such a procedure is both hygienic and
results  in the  production of useful products.   However, circumstances may require  that
carcasses be accepted at the landfill. If only a few animal carcasses are involved, they may be
placed on the working face along with the other wastes. If a large number are to be disposed
at the fill, the carcasses should be deposited in a special trench and covered with 0.5 to  1 m of
compacted soil. If diseased animals are accepted for disposal, the trench should be isolated
from the area accepting the conventional solid waste and covered as soon as possible.
Regrading of the fill may  be required over time to compensate for settlement as the carcasses
                            -f,;
decompose.  The application of lime or other  chemical agents may be used to control foul
odors.
4.2.4.7   Tires
If vehicle tires are accepted at the landfill, preferably they should be cut into pieces to reduce
their bulk density and to control their tendency to migrate to the top of the fill. A less desirable,
alternate method of disposal (but feasible if the number of tires is small) is to spread them in a
single layer at the bottom of the fill.  When available, incoming brush or demolition  debris
should be placed on top  of the tires. The remaining wastes are then deposited on top of the
two layers.
4.2.4.8    Low-Density Wastes
Low-density wastes such as plastic containers, synthetic fibers, foam, plastic film,  and  rubber
scraps may rebound after compaction and possibly work up through the fill. To counteract this
tendency, the material should be deposited in  thin layers, covered with other waste, and
compacted.
                                                                                  4-15

-------
 4.3   Methods for Determining Quantities and Characteristics of Disposed
       Wastes
 A knowledge of solid waste quantities and composition is fundamental to the planning, design,
 and operation of a landfill.  During the planning process, the rate of solid waste flow into the
 disposal site must be determined, and all factors that influence the flow over time must be
 identified and evaluated.  Both current and future rates  of disposed waste flow must be
 calculated since a landfill operates over a number of years.

 The determination and estimation of waste quantities and characteristics should be conducted
 using scientific methods [3]. Among methods of potential utility and relevance are those that
 have been developed for statistical sampling, to determine quantities of waste using a weight
 (gravimetric) survey, and to determine waste composition.  Methods are also  available  to
 determine other properties of  solid waste, e.g., moisture content, concentrations of metals,
 particle size distribution, and density. The methods include procedures for analyzing the data
 and for determining accuracy, precision, and quality of the data.

 For the highest degree of utility and accuracy, field  determinations of waste quantities and
 composition .should be integrated and conducted concurrently.  A similar recommendation
 applies to the field determination of other waste characteristics, e.g., moisture content and bulk
 density.

 Before beginning either a quantity or a composition survey, it is important to make sure that no
 "illegal" dumping or scavenging takes place prior to collection (or prior to sorting  the sampled
wastes).   If these activities cannot be completely controlled or held in abeyance, then they
should be maintained to a minimum or properly accounted for in the analysis of the data. This
admonition is in keeping with the overall goal of a quantitative waste characterization study: an
accounting of all the wastes generated within the survey area.
                                                                                  4-16

-------
The quantities and characteristics of disposed wastes can be estimated using quantitative or
qualitative methods.  The use of quantitative methods (i.e., sampling and measurements from
the  subject wasteshed1)  provides  more accurate information than  the  use of qualitative
methods, which use information from the literature or other locations to draw conclusions about
the  subject wasteshed.   Quantitative measurements of current waste  characteristics  are
appropriate for estimating the characteristics over the course of a landfill's lifetime only if the
disposed waste stream does not, or is not  likely to, vary considerably in characteristics over
time, e.g., if recycling of waste-derived  materials  will not be  significant over the  planning
period. Quantitative methods can also be used to establish seasonal  (i.e., within a 12-month
period) variations in characteristics of the wastes.  In the case where  disposed waste
characteristics do or can be expected to vary significantly over the lifetime of a landfill (e.g., 10
to 20 years), the future characteristics of the wastes must be estimated by considering and
analyzing the entire (i.e.,  generated) waste stream.  This analysis should be supported by
adequate quantitative measurements.  The estimation is  performed from  an analysis of the
estimated characteristics of the generated wastes and of those wastes  that are diverted.  In
other words, the characteristics of disposed wastes are equal to those of the generated
wastes, less those of the diverted wastes.

The fundamental  principle underlying  the  estimation of disposed waste properties is  the
conservation of mass. The basic conserved properties are  mass, composition (i.e., type of
materials; e.g., tin cans,  newspapers,  and food waste), and chemical  compounds.  The
principle of conservation of mass can be  used in connection with  estimating quantities of
various types of materials that will  enter a disposal facility,  e.g., bulky wastes, food waste,
recyclables, water, and chemical compounds.  These types  of estimates  are of utility in the
planning and implementation of the landfill facility and its component systems, e.g., landfill gas
collection system.
1    A wasteshed is a geographical area of waste generation.

                                                                                  4-17

-------
 Using the estimated quantities of types of materials and their estimated chemical properties,
 the composition of the types of materials (on a weight basis) and the chemical loadings into
 the landfill can be calculated in a straightforward fashion.

 4.3.1    Typical Waste Characteristics
 Typical compositions of solid waste streams in several areas of the world and some other
 useful design data are given in Tables 4-3 and 4-4.  From a review of the data in the tables,
 the reader can observe that solid wastes in economically developing countries can have a high
 putrescible content (and, therefore, moisture content) and a large percentage of inert materials
 (e.g., ash).  The characteristics of the wastes can be expected to vary by source or type of
 waste, as shown in Table 4-4.  Seasonal variations in the waste stream can also be expected,
 and the waste stream can be effected by local customs, e.g., in some locations, solid fuel,
 coal, or wood is used for domestic cooking and generates an ash requiring disposal.  The
 characteristics of  the wastes influence  the  design,  operation, and performance of both
 diversion and disposal systems.

 Direct, quantitative measurement of many Of the properties of bulk (i.e., as-delivered) solid
 waste is impractical  because .the range of both very large and  very  small  particles that
 compose solid waste compromises the ability to collect representative samples and to properly
 prepare  them for  laboratory analyses.  Consequently,  the properties, or synonymously the
 characteristics, are usually estimated based on those of the components that comprise the
 mixture.  The analyses of component characteristics are much more practical than those of
 bulk solid waste, and the analytical results can be used readily for purposes of estimation of
the characteristics  of bulk solid waste.

Although  many  characteristics of bulk solid waste cannot be determined  directly, some
analyses of the characteristics can be performed readily and practically, including bulk density.
                                                                                  4-18

-------
                         Table 4-3. Quantity and Composition of
                       Disposed Municipal Solid Waste (% wet wt.)a
UafAtifll
PViejHM IBM
Yard, Food, Market
Wastes
Paper
Metals
Glass
Plastics
Textiles
0018111108,0081,
Stones
Generation
(ko/cap/day)
Urban
Areas,
India
74.7
2.0
0.1
0.2
1.0
3.0
19.0
0.9
Ibadan,
Nigeria
76.0
6.6
2.5
0.6
4.0
1.4
8.9
0.4
Manila,
Philippines
53.7
12.9
5.8
3.5
1.6
1.8
20.7
0.9
Asuncion,
Paraguay
60.8
12.2
2.3
4.6
4.4
2.5
13.2
1.4
Mexico
City,
Mexico
56.4
16.7
5.7
3.7
5.8
6.0
5.7
1.5
Lima,
Peru
34.3
24.3
3.4
1.7
2.9
1.7
31.7
2.1
Riode
Janeiro,
Brazil
47.8
31.5
5.9
4.7
3.9
4.1
2.1
1.2
Caracas,
Venezuela
40.4
34.9
6.0
6.6
7.8
2.0
2.3
2.1
Berkeley,
California
41.5
40.3
3.1
5.6
6.0
2.0
1.5
2.2
 Source:  CalRecovery, Inc.
 *   Data for Berkeley, California are based on quarterly one-week field
    Data for other locations are the results of one or two field sampling
    days.
sampling events over a 12-month period.
events, each in the range of about 7 to 14
               Table 4-4. Average Composition of Various Types of Wastes
                         Generated in Asunci6n, Paraguay (wt. %)
Material
Putrescibles
Wood
Cardboard
Paper
Ferrous
Glass
Plastic
Leather
Textiles
Dirt
Bulk Density
(kg/m3)
Residential
70.8
0.5
3.1
8.0
2.6
4.8
3.9
0.4
2.2
3.7
384
Commercial
57.9
2.1
3.9
17.0
1.8
9.9
4.8
0
1.2
1.4
304
Market
83.7
3.4
3.4
3.9
0.3
2.3
2.6
0
0.1
0.3
432
Street
Sweepings
23.1
0
0.8
3.3
0.5
2.5
1.6
0
0.6
67.6
688
Source: CalRecovery, Inc.
                                                                                      4-19

-------
The starting point for estimation of disposed waste stream characteristics is composition, i.e.,
the mass fraction of the various components (or types of materials).  Using the composition
and the characteristics of the  individual components, the characteristics of a mixture of
components  can be  calculated in  those cases or  under those conditions  in which the
characteristic of interest is a  conserved characteristic on a  mass  basis.   A conserved
characteristic on a mass basis is one that observes the law of conservation of mass and one in
which any losses due to conversion of mass to energy are insignificant. In simple terms, this
condition specifies that in a system, the final mass of a conserved characteristic will equal its
initial mass.

Characteristics that comply with the conservation of mass and that both affect and are relevant
to landfill design and  operation  .include moisture content and elemental content (e.g., heavy
metals, carbon, and oxygen).

In the case of mixed solid waste entering a processing  or disposal  facility, a conserved
property of the mixture can be  estimated based on a knowledge of the composition of the
mixture and of the characteristics of the components of the mixture, the governing relation is:
             n
       P=   I   (mft*p>)
where:
       P =  the  value  of the conserved  property,  or characteristic,  of  the  mixture  of n
       components;

       mfj is the mass fraction of component "i;" and

       PJ is the concentration of property "p" in component i.
                                                                                 4-20

-------
The values of non-conserved characteristics do not adhere to a summation of the multiplication
of mass fraction / and property / over all of the components. An example of a non-conserved
characteristic is the property of bulk density.

4.3.2     Waste Quantities
Disposed waste quantities can be estimated using several different methods.  In terms of
accurately and precisely determining the quantities of waste that are generated  or disposed
over a fixed period of time, weight surveys are the most reliable method.  In a weight survey,
vehicle weigh scales are  used to measure the loaded  and empty  weights of the vehicles
collecting or disposing of loads of waste. The net weight is computed directly as the difference
of the loaded and empty weights. The ideal situation is to weigh all of the loads of waste;
however, practicality may dictate that only a representative sampling of loads be weighed.
Either portable or permanent vehicle scales represent feasible methods of weighing.

The other methods of determining quantities of waste are less accurate and precise than the
method described in the preceding paragraph.  In order of descending preference, the other
feasible options for estimation of quantities use the following procedures:

1.     Vehicle count and in-vehicle bulk density of the waste

       This method relies on the collection of the following data over an appropriate interval of
       time to secure representative results: number count of vehicles, an estimate of volume
       of the load, and in-vehicle  bulk densities for the wastes. The in-vehicle bulk densities
       can be determined through a weight survey. One of the greater contributors to error in
       this method  is inaccuracies associated with estimating volumes, particularly the
       volumes of wastes contained  in  compaction  vehicles  and  other covered loads.
       (Although not recommended and only for use in cases of financial hardship and of last
       resort, in-vehicle bulk densities of wastes can be estimated from data in the literature,
                                                                                  4-21

-------
       as  long as  relevant values are selected  from the  many that can  be found  in the
       literature.)
                 n
       Q(kg) =  I  [volume (m3)x bulk density (kg /m3)],
               i = l
 2.     Vehicle count and average weight of load of waste
       This method is similar to that described immediately above. The main difference is that
       an  average weight of  a load of waste is determined as opposed to estimating the
       volume of the load and applying a value for the bulk density of the wastes.
                 n
       Q(kg)=  £  [avg load weight (kg)]t
               / = !
 Regardless of the method selected for estimating waste quantities, the utility and the accuracy
 and precision of the estimates can be increased substantially by measuring and compiling the
 data by type of generator (or source) and by type of collection vehicle [3].  In many instances,
 the type of generator (e.g., residential) can be related  directly to the type of collection vehicle
 (e.g., rear loading  packer).  Additionally, the collection of statistical data  and information
 regarding the demographics of the area from which the  wastes  are collected allows the
 computation of unit rates (i.e., per capita) of collected wastes and further expands the utility of
 the data  collection activities and analysis. Many factors influence the unit rate of generation of
 solid wastes, including social and  cultural  customs,  level  of technical  and  economic
 development, and climate.  For a point of reference, unit rates of residential waste generation
 in economically developing  countries typically are in  the range of 0.2 to 1.0 kg/capita/day,
 based on quantities of collected waste from several economically developing countries. The
unit values of waste generation, along  with population data and other demographic statistics,
can  be  used to estimate approximately the quantities of  waste produced over a different
                                                                                   4-22

-------
universe of the same types of generators or collection vehicles. As alluded to in Chapter 2, if
the quantities of collected wastes are to be used to estimate the current quantities of disposed
wastes or the quantities that would be disposed if the collection coverage were expanded, the
effect of expansion of collection coverage, of scavenging (resource recovery) prior to disposal
of the wastes, or both must be accommodated during the process of estimating quantities of
disposed wastes.

If resources are lacking for the collection of detailed data concerning generated and disposed
wastes,  estimates can  be made using  judiciously selected unit rates  of generation and
population.  This method of estimation is suitable for planning purposes but is not a substitute
for the collection of actual data for the purpose of designing and implementing a landfill.

With the selection of appropriate assumptions, the current estimates  of disposed waste
quantities can be projected  to  future estimates of quantities of disposed wastes.   The
identification and quantification of the assumptions primarily involves consideration of:  1) the
degree of collection coverage and of the extent of resource recovery in the future, and 2) the
rate of growth  of population and of economic development.
                   t
The initial timef rame of a waste quantification study should be one year, with periodic sampling
events scheduled  at least quarterly or semi-annually for a duration  of at least one to two
weeks. In no case should the duration of the periodic sampling activities  for a particular type
of sampled population be less than the periodicity of scheduled waste collection.  For example,
if the frequency of waste collection is once every two weeks, then the duration of the sampling
period should be at least two weeks. This suggested frequency and duration of sampling and
measurement  events  will  provide sufficient data and  analyses to allow judgement of the
accuracy and precision of the data and the trend of the data.  Once these judgements are
made, the frequency and duration of subsequent surveys should be adjusted accordingly.
                                                                                4-23

-------
 4.3.3     Composition
 The  composition  of disposed  wastes  can be determined  by  sampling  and sorting
 representative samples of waste into specified material categories using scientific methods.
 The number of material categories sorted is a function of a number of variables, including local
 recycling activities and financial resources. The minimum suggested categories of the initial
 analysis are shown in Table 4-5.
                Table 4-5. Minimum Suggested Composition Categories
      Category
Subcategory
      Organic Materials
      Paper
      Plastic

      Food and Market Wastes
      Yard Waste
      Other Organics

      Inorganic Materials
      Metals

      Glass

      Other Inorganics
      Hazardous and Special
      Wastes
Corrugated paper and containers
Newspaper
Other paper
Film
Rigid
(wood, leather goods, etc.)
Aluminum beverage containers
Steel food and beverage containers
Other
Food and beverage containers
Other
(concrete, ash, dirt, etc.)
(toxic wastes, sludges, bulky wastes, batteries, etc.)
The categories shown in the table can be divided further into subcategories, as shown, if such
a level of detail is needed, such as for purposes of recycling.  The list of sorted materials
should be modified, if appropriate, after the results of the initial (and subsequent) sampling and
sorting event(s) are analyzed.
                                                                                4-24

-------
The wastes can be sampled at the place of generation, at a waste transfer facility, or at a
disposal site, depending on the configuration of the local collection and disposal system.  The
initial data collection effort should be conducted quarterly or semi-annually over a period of 12
months, with each sampling event encompassing at least a 1- to 2-week period, in order to
achieve the collection of reasonably accurate data on the composition of a community's waste
output.  Similar to the waste quantification study, the length of  the  sampling  period for
analyzing the waste composition of a particular sample population should be no less than the
minimum period of waste collection service.

As in the case of determining waste quantities, samples of wastes should be analyzed from
different types of generators and from different types of vehicles in order to provide data of
maximum utility to facility design.

With respect to sample size for determinations involving the  composition of residential and
commercial wastes, the minimum weight per sample should be on the order of 100  kg.  If the
weight of the sample is less than 100 kg,  then the possibility of obtaining a  representative
sample is lessened. Accuracy and precision are closely related to the particle size distribution
of the material to be  sampled. Wastes, or loads of waste, containing large  particles (e.g.,
construction and demolition debris) may require larger sample weights in order to ensure that a
representative sample of the waste is collected and analyzed.

The magnitude of errors  due to change in moisture content and loss through  decomposition
can be reduced by beginning the analysis of the samples within 2 to 3 hours after collection.

The recommended method for determination of solid waste composition is that promulgated by
the American Society for Testing and Materials (ASTM Designation D 5231-92, Standard Test
Method for Determination of the Composition of Unprocessed Municipal Solid Waste).  The
Method describes  the procedures and methods for selecting and collecting  representative
                                                                                  4-25

-------
 samples from a vehicle load of waste for analysis; for manual sorting, weighing, and recording
 date; and for statistically analyzing and presenting the data. The accuracy of a composition
 analysis is a function of the number of samples that are collected and sorted. As a guideline
 and assuming resources are limited,  sampling and sorting should be initially conducted twice
 per year, with the duration of each  study being equal to or greater than the frequency of
 collection (e.g., 7 days) and with the sampling of 10 to 30 vehicle loads of waste.  The samples
 should be drawn from among the various types of waste generators specific to the area, e.g.,
 residential, industrial.

 4.3.4     Other Physical Characteristics
 A knowledge of several  other characteristics of solid wastes also is required for the proper
 design and  successful  operation  of a landfill.   Among  the  more  important physical
 characteristics are:  1) moisture content, 2) bulk  density, and 3) particle size distribution.  For
 example, a knowledge of the moisture content of solid waste is required  in the analysis of
 leachate production  and  in the design of material handling systems at the fill.  Also, the bulk
 density of the waste as  delivered to the disposal  facility must be known to estimate waste
 quantities in some cases and to estimate the requirements for cover material.  An important
 relation is that bulk density is very sensitive to moisture content.  Lastly, the physical size (i.e.,
 particle size) of wastes entering  a landfill influences the manner of handling and processing.
 Large quantities of bulky wastes (i.e., materials of large particle size; e.g.,  discarded  railroad
 ties, conduit, telephone  poles)  delivered to a landfill  at one time represent operational
 problems if their existence in the  waste stream was not known when the operating plan for the
 landfill facility was developed.

A  quantitative knowledge of the above characteristics  is best;  but  in the absence  of
quantification, landfill designers and operators should at a minimum have a knowledge of the
three above-mentioned physical properties.  Methods of qualitative assessment include visual
                                                                                   4-26

-------
observation of all of the types of solid wastes under current consideration for disposal, as well
as observation of wastes delivered to disposal sites in other locations serving populations with
similar characteristics as that in question.

In the following  subsections,  methods and procedures are given for quantitative analysis of
moisture content and bulk density. The conduct of the analyses described below requires that
a representative sample of wastes be collected.   A variety of methods for sampling can be
used.  One common method consists of mixing sufficient quantities of wastes into a pile such
that they are representative of  the wastes designated for study and subsequently randomly
selecting one-quarter of the pile's volume as the analytical sample (this procedure is called the
cone-and-quartering method).   In the case of domestic wastes, analytical  sample weights in
the range of 50  to 200 kg usually would be adequate for determination of uncompacted bulk
density and of moisture content unless data are available to indicate that a different weight of
sample is needed.
4.3.4.1     Moisture Content
The procedure for determining moisture content is as follows:

1.     Weigh the sample as received (Vet weight")-

2.     Oven dry the sample at 80 to 100°C until no change in weight occurs. Air drying of the
       sample can be used  prior to  oven drying  if such  a  procedure  is convenient and
       improves productivity.

3.     Determine the moisture content (%) through the following formula:
              WW-WD
                Ww
                      *100%
                                                                                  4-27

-------
       where:

       Ww = wet weight of Sample, and

       WD = dry weight of sample.

 The weight of the sample for determination of moisture content should be sufficiently large to
 ensure that the measured moisture content is representative of the sampled population. In the
 case of residential and commercial solid waste, a sample weight of about 25 to 50 kg usually is
 sufficient.  The oven drying of wet, mixed solid waste requires that a large oven be available
 (e.g., a kitchen oven or commercial, laboratory oven) and that the sample of waste be oven
 dried in batches if the oven cannot accommodate the entire sample at one time.

 Since a sufficiently large oven may not be available for this analysis, an acceptable procedure
 is to air dry the sample to constant weight, calculate the air dry moisture content as a percent
 of the wet weight,  and add  8 to 10% to the calculated percentage to convert the air-dry
 moisture percentage to an oven-dry value.  This procedure will  provide an estimate of the
 oven-dry moisture content.  The difference  between the air-dry moisture content  and that
 based on oven drying (i.e.,  the 8 to 10%) can be determined (or confirmed) experimentally for
 local conditions by air and oven drying several samples of waste.

 The most accurate method of determining oven-dry moisture content of the sample is to oven
 dry the material.
 4.3.4.2    Bulk Density
 The uncompacted bulk density of solid waste can be measured by filling a container of known
 volume with wastes and weighing the loaded container.  The measurement of uncompacted
 bulk density is sensitive to the relation of the dimensions of the container to the particle size
distribution of the sampled material.  The smallest linear dimension of the container should be
at least three times the largest linear dimension of the material particles. Also, the container
                                                                                  4-28

-------
should be agitated slightly and topped off, if possible, to reduce void space; thus resulting in a
representative value of the bulk density of the sampled population.  The  bulk density is
calculated by dividing the net weight of the waste (weight of loaded container minus weight of
the container when empty) by its volume. The result is expressed as kg/m3.

4.3.5     Estimating Gas and Leachate Production
Gas production and leachate production depend on the types of materials placed in the landfill
and on their  physical,  chemical,  and  biological  properties, as  well as  the operating  and
environmental conditions in and around the fill.  Estimates of gas production and composition
can be made based on the estimated elemental analysis of the wastes and the assumption of
an anaerobic chemical reaction.  Estimates  of the concentrations of chemical compounds in
the leachate (e.g., the conserved soluble compounds such as chloride) can be made using the
estimated loading rates of chemical compounds inherently in the wastes entering the fill and
estimates of water flows through the fill, using any one of a number of models for chemical
reactions and for hydraulic flows in a landfill system.

The processes  of  estimation  described in the  previous  paragraph require the  use. of
professional judgement, as  well  as  the  use of basic  mass balances  and  chemistry.
Professional judgement includes taking into account the effects that are not readily reduced to
basic principles  when  dealing with a landfill environment.  The effects include degree of
solubility of metals and rate-associated phenomena (e.g., rates of gas and leachate formation,
and absorption).  However, estimates can be performed on the basis of worst-case or best-
case conditions  (e.g., all of a chemical compound becomes soluble in the leachate) and
modified based  on the incorporation  of  professional experience  and the availability of
laboratory or field measurements.
                                                                                 4-29

-------
Gas production, as well as composition, can be estimated using the basic chemical reaction for
an anaerobic process of decomposition.  An example is given in Table 4-6.  The example
illustrates the anaerobic decomposition of a hypothetical mixture of solid waste (on a dry-
weight basis and with a specified  volatile solids  content  of  75%), assuming complete
conversion of carbon to carbon dioxide and methane.
                                                                                 4-30

-------
                   Table 4-6.  Estimation of Landfill Gas Production
                        from  Ultimate Analysis of Solid Waste
Governing equation for anaerobic process of decomposition:

     CaHbOcNd + [(4a-b-2c+3d)/4]H2O -* [(4a+b-2c-3d)/8]CH4 + [(4a-b+2c+3d)/8]CO2 + dNH3

where:

     C = carbon; H = hydrogen; 0 = oxygen; N = nitrogen; and
     a, b, c, and d = number of moles.

Volatile solids content is assumed to be 75% on a dry weight basis.

The estimations below are based on dry weight of solid waste.
                                     Feedstock
Element
C
H .
O
N

Moles
30
48
16
0.5
•;
Atomic Weight
12.01
1.01
16
14.01

Mass Fraction
0.54
0.07
0.38
0.01
1,00
                               Landfill Gas Production
Gas
Specie
CH,
COz
NH3
Molecular
Weight
16.05
44.01
17.04
Moles
16.81
13.19
0.50
Mass
Fraction
(kgo/kgvs)
0.40
0.86
0.01
Mass
Fraction
(kgo/kgi)
0.30
0.65
0.01
Gas Comp.
(%)
31 A
67.6
1.0
Legend:   kgo = kg output
          kgi = kg in of feedstock
          kgvs - kg volatile solids in feedstock
                                                                                4-31

-------
References

1.    Diaz, L.F. and C.G. Golueke, "Solid Waste Management in Developing Countries,"
      presented at the BioCycle West Coast Workshop on  Recycling Municipal  Refuse,
      Sludge, and Industrial  Wastes, San  Francisco, California,  March  1985, BioCycle,
      26(6):46-52, September 1985.
2.    Brunner, D.R., D.J. Keller, C.W. Reid, and J. Wheeler,  Sanitary Landfill Guidelines -
      1970, U.S. Department of Health, Education, and  Welfare, Bureau of Solid Waste
      Management, 1970.
3.    Savage, G.M., The History and Utility of Waste Characterization Studies," presented at
      the Air & Waste  Management Association 86th Annual Meeting &  Exhibition,  Denver,
      Colorado, June 1993, MSW Management, 4(3):70-78, May/June 1994.
                                                                               4-32

-------
Chapters
Waste Diversion Impacts on Landfills

5.1    Introduction
The importance of the characteristics of the wastes entering the landfill was introduced and
discussed in Chapters 2 and 4.  Prior to landfilling, the characteristics of the wastes can  be
influenced or manipulated at several points along the path from the point of generation to the
point of disposal.  Waste diversion programs (i.e., those methods and strategies that reduce
the quantities and types of materials discarded for final disposal, that result in the recycling of
materials, or both) directly influence and control both the quantity and the properties of the
waste stream that  enters a land  disposal facility.    Thus,  the  planning,   design,  and
implementation  of the  facility are sensitive to the extent and nature of waste  diversion
programs.  The greater the extent of waste diversion programs, the greater is their impact on
the types and quantities of wastes that will be delivered to the disposal site, and thus on the
design and operation of the facility. Additionally, if recycling of materials follows the trends of
the past 10 years in a number  of the industrialized countries, the wastes entering disposal sites
should be considered to be in a dynamic condition in terms of quantities and characteristics,
and thus require close monitoring.  One result of a successful diversion program is that less
waste requires disposal; thus,  less new disposal capacity is required,  or the life of an existing
landfill volume is extended.

There are several types of waste diversion programs.  Examples include:

•      programs that eliminate or reduce the quantities, toxicity, or both of materials entering a
      land disposal  facility; and
                                                                                    5-1

-------
 •     govemmentally  sanctioned,  or  unsanctioned  (i.e.,  informal),  recycling  activities
       instituted at the point of collection, exercised during the collection process, or exercised
       immediately prior to covering of the wastes, or any combination of these practices.

 5.2   Types of Diversion Programs and Impacts
 For the  purpose of the guidance document,  diversion programs are categorized into the
 following: waste reduction, recycling, scavenging, composting, and energy recovery.
 Waste reduction programs are implemented at the point of waste generation and include those
 that reduce  or  eliminate  quantities and/or hazardous  characteristics  of  discarded wastes.
 Recycling programs are defined to be those that are govemmentally sanctioned (i.e.,  formal
 programs). The recycling programs can be implemented at the point of waste generation and
 collection (termed "source separation"  programs) and/or at a facility  or  location that  is
 dedicated to the recovery of secondary materials from mixed MSW.  In  the  case of  source
 separation, the generator separates the materials of value from the other materials (i.e., those
 that have no net value) and sets them out separately for collection and for processing (in a
 source-separated materials recovery facility).  In the case of recovery of materials from mixed
 waste at a processing facility or location (e.g.,  a transfer station or a dedicated mixed waste
 materials recovery facility), the  recovery can  be effected using manual labor, mechanical
 processing, or both.  The processing can be conducted at a processing facility on or near the
 landfill.

 Scavenging is the unsanctioned removal (or recovery) and marketing of materials of value
 from discarded wastes.  This activity can occur anywhere from the point  of setout of the
wastes to the point immediately before the covering of the wastes at the landfill. Commonly, in
economically developing countries, scavenging occurs  during collection  and at  the disposal
site.
                                                                                   5-2

-------
Composting is the controlled biological decomposition of organic materials. Discarded organic
materials can be composted using one of a  number of low or high technology processes.
Conventional composting programs include those that collect and process source-separated
organic  materials and  those that  process  mixed  wastes  and recover and compost a
predominantly organic fraction.  Regardless  of the manner of collection and recovery of
organic materials, the end product of composting is a soil amendment. Given the  proper
conditions, composting can also be carried out  at the point of generation.
Energy recovery is the  use of discarded  materials for the production of energy using any
number of energy conversion processes (e.g.,  direct combustion, anaerobic digestion, thermal
gasification). Discarded combustible materials are the materials sought for energy conversion
processes.  These types of materials can be furnished  by waste management programs that
collect and process source-separated combustible materials (e.g., mixed paper) or by mixed
waste processing facilities that recover  a combustible fraction (i.e., refuse-derived fuel (RDF)
systems).

5.3    General Impacts of Waste Diversion Programs
Generalizations regarding the influence of diversion programs on disposed waste quantities
and  characteristics are difficult when considering the entire economically developing world.
Consequently, for the purpose of  providing  some understanding of  the  dependence of
disposed waste characteristics in economically  developing countries on materials diverted prior
to landfilling, some examples can be offered of typical conditions and influences.
Programs that divert containers (e.g., glass and metal) result in a net increase in the moisture
content and in the organic content of discarded wastes, unless putrescible materials are also
diverted.  Putrescible materials usually are high in moisture content.
                                                                                  5-3

-------
 Programs that divert substantial percentages of putrescible materials (e.g., food preparation
 residues, yard (green) wastes, and market wastes) from generated waste, and no other types
 of materials, yield a drier and more inorganic disposed waste stream than if the putrescibles
 are disposed with the mixed wastes.

 5.4    Estimation of Diversion Impacts on Landfills
 Aggressive diversion programs can substantially change the current characteristics  of the
 wastes that reach the final disposal site. If aggressive diversion programs are implemented,
 the quantities of wastes that will require disposal will decrease and the characteristics  will be
 changed.
 The characteristics of disposed wastes can be estimated based either on relevant information
 that can be found in the literature concerning the properties of solid waste or its components or
 on waste characteristics that are measured locally. In addition, the process requires the use of
 fundamental relations that govern the estimation of the material properties of a mixture based
 on the properties of the individual components.
 Waste  properties of utility in the design and  operation of landfills include the density of the
 waste in its as-delivered state, the chemical  compounds present in the waste,  the moisture
 content of the waste, and the composition of the waste.

 The impacts of diversion programs on the quantities and  composition  of wastes entering
 landfills depend on the specific types of diversion programs and on the rate of diversion.  A
 material balance and estimates of the effectiveness of the diversion programs (i.e., percentage
 of generated wastes that are  diverted from  the generated waste  stream) can be used to
 calculate the impacts.  Illustrations of the impacts of different levels of diversion on disposed
waste quantities and composition are shown in Table 5-1.
                                                                                    5-4

-------
             Table 5-1. Examples of Impacts of Different Levels of Diversion
                   on the Composition of Disposed Municipal Wastes*
Material Type Gen.
Comp."
(%)
Metals 3.0
Glass 3.0
Plastics 4.0
Other Inerts 15.0
Subtotal Inerts 25.0
Paper 20.0
Putrescibles 52.0
Subtotal Organics 72.0
Textiles 3.0
Total 100.0
Low
% Dis- Die-
Diverted posed posed
Mass* Comp.
(%)
10 2.7 2.8
10 2.7 2.8
10 3.6 3.7
0 15.0 15.5
24.0 24.7
10 18.0 18.6
0 52.0 53.6
70.0 72.2
0 3.0 3.1
97.0 100.0
Medium
K Dis- Dis-
Diverted posed posed
Mass Comp.
W
25 2.3 3.0
25 2.3 3.0
25 3.0 4.0
0 15.0 20.2
22.5 30.3
25 15.0 20.2
35 33.8 45.5
48.8 65.7
0 3.0 4.0
74.3 100.0
High
% Dis- Dis-
Diverted posed posed
Mass Comp.
W
50 1.5 3.1
50 1.5 3.1
50 2.0 4.1
0 15.0 31.1
20.0 41.4
50 10.0 20.7
70 15.6 32.3
25.6 53.0
10 2.7 5.6
48.3 100.0
"   Sums may not total exactly due to rounding.
b   Gen. Comp. = composition of generated waste.
0   For this illustration, mass can be any unit of mass (e.g., kg).
An estimate of the elemental properties of disposed wastes can be calculated from  an
estimate of  the  disposed waste composition.   An illustration  of the estimation  of the
concentration of the metal lead (Pb) entering a disposal site, based on the diversion scenarios
described in Table 5-1, is given in Table 5-2.
An example illustrating the impact of diversion programs on the average ultimate (i.e., carbon,
hydrogen, oxygen, and nitrogen) analysis of discarded mixture of solid wastes  entering a
landfill is given in Table 5-3.
                                                                                   5-5

-------
             Table 5-2. Examples of Impacts of Different Levels of Diversion
                  on the Concentration of Lead (Pb) Entering a Landfill"
Material Type (/)
Metals
Glass
Plastics
Other Inerts
Subtotal Inerts
Paper
Putrescibles
Subtotal Organics
Textiles
Total
Pb Cone.
(mg/kg,)
200
0
20
100
NA
40
10
NAb
5
NA
Diversion Rate
Low
Disposed
Comp.
(%)
2.8
2.8
3.7
15.5
24.7
18.6
53.6
72.2
3.1
100.0
Medium
Disposed
Comp.
(%)
3.0
3.0
4.0
20.2
30.3
20.2
45.5
65.7
4.0
100.0
High
Disposed
Comp.
(%)
3.1
3.1
4.1
31.1
41.4
20.7
32.3
53.0
5.6
100.0
Pb Loadings (mg/kg MSW)

Low
5.6
0
0.7
15.5
21.8
7.4
5.4
12.8
0.2
34.7

Medium
6.1
0
0.8
20.2
27.1
8.1
4.5
12.6
0.2
39.9

High
6.2
0
0.8
31.1
38.1
8.3
3.2
1i.5
0.3
49.9
 "   All data are on a wet-weight basis; sums may not total exactly due to rounding.
 b   NA = not applicable.

 The implementation of diversion programs and changes in  the characteristics of disposed
 wastes  can influence the production and  characteristics of landfill gas.   Gas production is
 fundamentally governed by the ultimate analysis of the landfilled wastes and by conditions in
 the landfill.

The discussions and examples presented in the preceding paragraphs  of this  subsection
illustrate that  waste diversion  programs  can have  a major  impact on the quantity and
characteristics of the wastes reaching the final disposal site.  Very few of these types of
programs have been implemented in economically developing countries and, consequently,
                                                                                   5-6

-------
                 Table 5-3. Examples of Estimation of Ultimate Analysis
                            of Municipal Solid Waste (MSW)
Waste
Component
Ferrous
Aluminum
Glass
Mixed Paper
Newspaper
Corrugated
Plastic
Yard Waste
Food Waste
Other
Inorganics
Other
Organics
MSW
Comp. (%
wet wt.)
3.9
1.2
5.0
21.5
11.6
4.3
11.5
10.1
15.0
7.1

8.8

100.0

C
0.8
0.8
0.5
44.0
48.8
45.5
59.8
49.3
41.7
0.5

48.8

38.3
Ultimate Analysis
H
0
0
0.1
6.2
6.1
6.1
8.3
6.4
5.8
0.1

6.1

5.1
(% dry weight)
0
0.2
0.2
0.4
41.7
42.7
44.5
19.0
36.3
27.6
0.4

28.3

27.2

N
0
0
0
0.4
0.1
0.2
.1.0
3.0
2.8
0

1.8

0.8
Note:  Balance of dry weight percentage is sulfur, chlorine, and ash.

little data are available in the literature on any impacts. However, based on the composition of
the wastes, experiences had in industrialized countries, and the examples presented in  the
previous subsections, a few general statements can be made.
In many economically  developing  countries, the main  component of the waste stream is
organic (putrescible matter).  Consequently, the. implementation of any type of program aimed
at the diversion of organic matter from final disposal would result in a substantial reduction in
                                                                                  5-7

-------
the production of gas, and the characteristics of the leachate would be substantially different.
For  instance, the  leachate would  have  the  tendency to  contain  substantially  lower
concentrations of biological  oxygen demand (BOD) and chemical oxygen demand (COD).
           •
Currently,  the  tendency  in  several  industrialized  countries  is  to  develop  solid waste
management strategies aimed at the processing or removal of most organic matter from the
waste prior to disposal on the land.  In some cases, the policies are aimed at reaching a
concentration of about 5% volatile solids in the materials suitable for final disposal.

Diversion of large percentages of organic matter from disposal also has other impacts on the
design and operation of a landfill.  Some of the potentially positive benefits include: lower risk
of generation of odors, the waste would be  less attractive to animals for feeding, and less
settlement.                  —

On the other hand, if the  diversion programs are limited to removing only those materials that
typically are recycled  in economically developing countries, such as paper products, some
metals,  glass  containers, plastics, and textiles,  the quantities and  characteristics of the
leachate would probably remain about the same.
                                                                                   5-8

-------
 Chapter 6
 Site Selection

 This chapter discusses the process that generally is required for the development of a site for
 a landfill.  The process can be lengthy - a 5- to 10-year period typically is required in the
 United States in order to locate suitable land from an engineering  standpoint, to secure the
 approval of the public, and to obtain regulatory approval.

 6.1    Non-Geological Aspects
 The discussion in this section encompasses the principal non-geological elements that should
 be considered in the site selection process.

 6.1.1     Defining the Need for a Site
 Several elements must be .considered during an evaluation of the  need for a land disposal
 facility.  The overall  process involves the identification of waste quantities and characteristics
 requiring  disposal, development of site selection criteria, location  of feasible land disposal
 sites, analysis of the sites, and final selection of a site.  In addition to defining the conditions of
 the current situation, the analysis should consider planned changes to existing systems (e.g.,
 waste collection  coverage)  and  the influence of  growth  of  population, new  industrial
 development, etc.
 6.1.1.1    Different Types of Waste to be Accommodated
 One  of  the  first steps  in the  planning process is the definition of the quantities  and
 characteristics of the wastes that are  planned to be accepted and  landfilled.  Unless special or
 unusual circumstances or requirements exist,  the usual types of solid  waste accepted at a
 landfill are residential, commercial, and industrial wastes. Some other types of waste also can
be acceptable at a landfill, as described in Chapter 4.
                                                                                   6-1

-------
 For a given wasteshed, local conditions and  circumstances will dictate the type of waste
 generators and the quantities and characteristics of the solid waste stream.  As mentioned
 previously (Chapter  4),  some  of the  solid wastes generated  by  industry may  have
 characteristics that dictate that they be handled separately at the landfill site.
 6.1.1.2   Measuring Quantities
 The knowledge of the types of waste must be supplemented by a determination of the waste
 quantities, both current and those projected over the planning period.  Thus, one objective of
 the quantification study is to arrive at the current annual quantities of waste to be disposed per
 unit of time  (e.g., Mg/yr).  The second objective is to estimate the quantities of waste for
 subsequent years of the project planning period.  The projections usually are based on the
 current quantities and escalated  (or de-escalated) by a  mathematical  formula.  Predicting
 future quantities  of waste is an inexact science, although several methods and procedures
 have been tried in the past.  The use of  population projections is suggested  as a means of
 sufficiently estimating future quantities of waste generation. The impact of resource recovery,
 as well as some  other factors, must also  be considered during  the process of estimation, as
 related in Chapters 4 and 5.
 6.1.1.3   Determining Waste Composition
 It is important to have a good understanding of the  characteristics of the waste requiring final
 disposal.  Among other impacts, for a given mass of solid wastes, the composition  of waste
 influences in-place density, number of vehicles using the site, land area required, and the
 amount of cover material needed.  Waste composition is discussed in greater detail in Chapter
 4.

 6.1.2     Review of Existing Facilities
The next stage in  planning the final disposal strategy and selecting a suitable site is to perform
                                                 i
a thorough review of all of the existing facilities.  Part of this task requires an analysis of all
existing sites and a calculation of remaining disposal capacity.  This analysis may  require
                                                                                   6-2

-------
some form of topographic surveying in order to facilitate the determination of remaining volu-
metric capacity.

The remaining volumetric capacity of existing disposal sites can be determined from plans
showing the topography of existing sites and of the final contours of the sites. If the plans are
not available, they should be prepared.  The surveying of waste disposal sites does not need
to be carried out to a high degree of accuracy to yield results sufficient for planning purposes.
Limiting the accuracy can result in reducing the cost of the surveys, as well  as the time to
conduct them. In some cases, aerial surveys may be the most efficient method of measuring
volumes, particularly if the capacity study encompasses a large number of disposal sites.

Accurate determinations of remaining volumetric disposal capacity and of estimated disposed
wastes quantities are crucial to the process of siting a landfill because, taken  together, they
substantially influence the capacity of the new disposal facility.

After the conclusion of the analyses of remaining volumetric capacity for each existing disposal
site, all volumetric capacities of existing facilities are  summed. The total volumetric capacity is
divided by the quantity and the estimated in-place density of annual waste deliveries, yielding
an estimate of the number of years of capacity before a new site is required.

The estimation of the required volume of the new site requires an estimation of in-place den-
sity of the waste and  of anticipated deliveries of waste quantities.  The in-place density varies
with type of waste,  method and degree of compaction, depth of landfill, and other factors.  In
the absence of better information, a value of 0.8 to 1.0 Mg/m3 may be used as an estimate for
planning purposes if a substantial compactive effort is planned for the new landfill operation.
On  the other hand,  if the landfill compactive effort is planned to be less (or proves to be lax),
the  in-place density may be 0.5 Mg/m3 or lower.
                                                                                    6-3

-------
 A review of existing land disposal sites and their life expectancy and quality can help convince
 officials and the public of the need for a new site.

 6.1.3     Plan
 Once the  lifetimes of existing and  any other proposed facilities have been calculated,  it is
 useful to develop a workplan for selecting the new site. Following the workplan will ensure that
 the new site or sites will be in full operation by the time the existing facilities reach capacity.
 The elements of the workplan usually are dictated by the legal and administrative procedures
 and requirements in force within the area. Typically, they include the following elements: site
 selection, preparation of an application for land use and submittal to the governing authority,
 permitting  processes and procedures, and conduct of engineering work.  In the preparation of
 the workplan, an awareness should  be  had that the process may take a considerable amount
 of time to complete.

 6.1.4     Assessment of Potential Landfill Capacity
 Upon completion of the workplan, the next step is to begin identification of prospective sites of
 the new landfill.  First of all,  the boundaries of the search area must be established.  This
 procedure  should be based on demographic and physical  limitations  such as  political or
 regional boundaries, mountain ranges,  and rivers.  Subsequent to defining  a search area, a
 suitable study area is established on the basis of haul distance, topography, geology, and
 surface and groundwater conditions.

 The distance of the landfill site from the area where  the waste is generated and is collected
 (the wasteshed) is the haul  distance.    If the landfill is near the collection area, then the
collection vehicles can travel directly to the landfill. If the landfill is remote from the collection
area,  some form  of transfer station  usually is planned  because collection  vehicles  are
expensive pieces of equipment and are inefficient for long-distance hauling of waste.
                                                                                    6-4

-------
At a transfer station, the waste is transferred from the collection vehicles to a bulk transport
system.  The transport system typically is composed of tractor-trailer equipment. However, rail-
haul has also seen limited use.
Normally at this point in the process, the overall cost of the collection and disposal system is
considered and analyzed for the purpose of establishing feasible distances for the disposal
site and modes of transportation of wastes to the site. As discussed in Chapter 5, the impact
of resource recovery must also be taken  into account in the analysis because it affects the
quantities of waste that will require disposal, and its cost must be included in the analysis of
total system cost.
Landfill sites usually benefit greatly from economies of scale. Thus, a very large, remote land-
fill may be less costly on the basis of unit cost than a small, local landfill.

6.1.5      Identification of Sites
Once  the  study area has been identified, keeping, in  mind the boundaries, the  access
constraints, and the physical limitations, the  next step is to identify suitable sites.  The type of
site can be one of two general types: mineral excavation areas in which waste can be placed
to restore the land, and areas of virgin land where a new landform can be established.
The development of a preliminary list of suitable sites can be substantially improved if maps
and site visits are used.  After the process of reviewing the site maps and conducting visits is
completed, a list of potential sites should be prepared.  The list should include the names and
locations of the sites, as well as notations about their advantages and disadvantages.
In terms of identifying sites of suitable land  area for a landfill, an example of initial screening
criteria would be sites containing 20 to 50 ha for a community of about 100,000 population.
                                                                                    6-5

-------
 6.1.6     Preliminary Selection Process
 In  this phase of the  process,  some  of the potential sites  are eliminated from  further
 consideration, while the remainder are subjected to additional analysis.  There are four critical
 factors in the selection of a potential site: availability, planning constraints, access, and
                                                                    /
 capacity.  A brief description of these factors follows:

 1.     Availability - It is advantageous if the prospective site is one that is currently owned by
       the developer of the landfill or is for sale.
 2.     Planning Constraints - Acquisition or use of the site may require some form of zoning
       or special  planning.  In addition, there may be an environmentally sensitive area, or
       another form of area requiring protection  (e.g., drinking water aquifer).  These sites
       should be eliminated from  consideration  as soon  as any of  these conditions  are
       identified.

 3.     Access -  Experience indicates that access is a  critical factor in  siting a landfill,
       particularly a landfill in or near a center of population.  In some cases, the general
       public may be more concerned with truck  traffic and congested roadways around the
       proposed landfill than with the actual landfilling of waste within the boundary of the site.
       Because of the concern of the public, and to  support the efficient  operation of the
       disposal facility, adequate access around the potential site must be available or must
       be  included as  part of the design.  With regard to adequate access and efficient
       operation, final disposal  is a waste  management operation that must be performed
       regardless of weather conditions.

4.     Capacity - Since the development of a new landfill typically requires considerable  time
       and expense, the site should have an appropriate disposal capacity.  A minimum of ten
       years is usually considered desirable.
                                                                                     6-6

-------
Other critical factors concerning the preliminary selection may also enter into the process of
evaluation based on local  conditions and  circumstances.  Regardless of the number of
evaluation criteria, the primary aim of the preliminary site selection process is to identify about
4 to 6 sites with the potential for development into a landfill.

6.1.7     Environmental Assessment
The next stage of the process is to carry out an environmental  assessment of  the sites
selected  in  the preliminary  analysis.   The environmental assessment  will require  the
preparation of designs for each site and the calculation of total system costs for developing
and operating each site.  Once this is completed, the potential environmental effects of each
site can be identified.
The environmental analysis can be facilitated by the development and use of  an evaluation
form.   The form should  list each site, each  evaluation criterion to be considered, and a
weighting factor for each evaluation criterion. The environmental evaluation criteria should be
weighted  according to their relative importance. At the end of the process of evaluation, the
scores for each site can be computed and a ranking of the sites can be prepared accordingly.
The evaluation form should include a listing of all of the possible impacts associated with the
development and use of the site,  together with certain other information already mentioned,
such as costs,  access, and capacity. Specific items that should be addressed in the analysis
include  those that are described below.  Also indicated below for each criterion are suggested
values for the weighting factors (in  percent) in the absence of another allocation of importance
based upon local conditions and circumstances:
•     the effects of the construction and operation of the landfill on human populations near
      the proposed site or along major access roads (20%);

•      the effects on the local flora and fauna (20%);
                                                                                   6-7

-------
 •     the nature and potential consequences of the underlying and surface geology (30%);
       and
 •     the effects of potential emissions from the site to land, water, and air resources (30%).
 Once the evaluation form has been completed, each site can be carefully evaluated and the
 potential environmental impacts assessed.  Then,  potential mitigations  for adverse environ-
 mental impacts can be identified.  An example of a mitigation is building along a bypass road,
 or the erection of a berm to reduce the noise from,  or visual impact of, a landfill. The cost of
 the  mitigations should be  added to the  cost of planning  and implementing the site under
 evaluation.
 Upon completion of these tasks, the next step is to reject  some of the  sites and reduce the
 number of potential sites to two or three. At this point, it is advisable to consult with the public.

 6.1.8     Public Awareness Campaign
 Public interest in environmental matters has increased substantially in recent years. The point
 at which the developer of a landfill should seek public input  or present a proposal to the public
 is a  matter for debate.

 If public input is sought too early, unnecessary opposition may be brought about.  On the other
 hand, if the consultation  of the public is sought too late in  the process,  the public may doubt
 that  its comments and advice will be taken seriously.

 When several realistic alternatives emerge from the  selection process that has been described
 previously, the time is appropriate for notification  of the  public and for public review and
 comment.

The  concerns of the general public with regard to the siting and operation of a landfill include
the following, broken down by topic:
                                                                                    6-8

-------
•      Proximity - the relative distance between the site  or access route and the human
       populations near the proposed site;

•      Economic - the concern of those living near the proposed landfill that property values
       will decline;

•      Leisure Use - the view that the presence of the proposed landfill will negatively impact
       leisure activities (e.g., fishing, hiking); and

•      Social - the perception that the  presence of a landfill diminishes the quality of life of
       those living or working near the site.

One of the more important steps that municipal officials or landfill developers can take to solicit
public support for a new landfill is to convert any existing open dumps or poorly operated land
disposal sites  into well-run landfills, including a well-defined  plan for the final use of the
completed landfill.
6.1.8.1   Objectives of a  Public Awareness Campaign
The success of a public awareness campaign for securing the approval of,the public for a
landfill depends on the  formulation of a  set of clear objectives.  Suggested objectives are the
following:

•      to ascertain that the public understands the proposals and the purpose and need for
       developing and operating the landfill,

•      to assure the public  that its views will be heard and addressed,

•      to ensure that the government or public authority is responsive to the public, and

•      to provide opportunities for public involvement in the decision-making process.
                                                                                    6-9

-------
 6.1.8.2    Advantages of a Public Awareness Campaign
 Some of the advantages of a public awareness campaign, having the objectives mentioned in
 the preceding paragraph, include:
 •     an increase in the likelihood of gaining the support of the public for the landfill plan,
 •     possibility of providing useful information which otherwise may have been missed,
 •     familiarization of the public with the final design and intended  use(s) of the landfill
       which may directly benefit the community (e.g., land use as a park),
 •     assurance to the public that all views have been considered,
 •     accountability by decision-makers, and
 •     an  effective mechanism to ensure that decision-makers take into  account all issues
       relevant to the public and to the project.
 6.1.8.3    Disadvantages of a Public Awareness Campaign
 Some of the potential disadvantages of a public awareness campaign include:

 •     the public becoming mired in certain issues to the exclusion of others,

 •     uninformed participants that may distribute erroneous information,

 •     public involvement which adds to the total cost of the project,

 •      delays that may be brought about by the process of informing the  public, and

 •      the landfill project may become a platform for politicians.

While  the  disadvantages are listed for the sake  of thoroughly  discussing the process of
involving the public,  the magnitudes of  the disadvantages listed above are not sufficient to
outweigh the benefits of an effective public awareness campaign.
                                                                                  6-10

-------
6.1.8.4   Steps in the Public Awareness Campaign
The following is a list of the more important steps of a public awareness campaign:

1.     Inform the public of all details of the plan.

2.     Establish  the need for the new site by explaining the situation, including the status of
       the existing facilities and the reason that a new disposal site is needed.

3.     Explain the alternatives that have been considered and  the reasons  that they have
       been rejected or selected.

4.     Explain the operations, the process for managing the site, control of leachate and gas,
       and closure and post-closure procedures.

5.     Describe  the impacts  of the development and operation of the landfill on the local
       environment and on the people who may be affected.

6.     Make every effort to clearly understand the concerns of people who live  near the site.

7.     Keep options  open.   If new information  becomes available  as a result of  the
       consultation with the public, then the selection process should have  the flexibility to
       incorporate the public's comments into the final selection.

8.     Review previous assessments of environmental impacts of the potential sites as new or
       more information is collected as a consequence of the discussions of the situation with
       people and businesses affected by the proposal.

Finally, the final selection should be made. At this point, the municipality or landfill developer
is ready to present a formal application for the development and  use of the site.  Many  of the
results and findings of the site selection process will be of use or will be required during the
preparation of the final design and the operational plans.
                                                                                   6-11

-------
 Although the discussion in the preceding sections of this chapter generally have considered
 that the siting of one landfill is the optimum situation, in some cases multiple disposal sites
                    — - . {_=
 may be necessary or required given the circumstances.  For example, in the case of a large
 municipality or urban region with little experience in the development of landfills, several small
 disposal sites might prove to be easier to implement and manage in the short run than one
 relatively large site.

 6.2    Geological Aspects

 6.2.1      Introduction
 The application of the scientific and engineering disciplines of geology, hydrogeology, and
 hydrology to landfills requires several years of study and of practical experience.  With this
 realization, the aim of  this section is modest.  It is meant to serve as an aid to the reader in
 understanding the key aspects of the above-mentioned disciplines and their relation to the
 selection of sites appropriate to landfilling of solid waste.

 The degree of risk of contaminating land and water resources as a consequence  of landfilling
 solid wastes depends largely upon the geology and hydrogeology of the site.

 During  the site selection process,  the geology and hydrogeology  of the area  must be
 thoroughly investigated and taken  into account at both the regional and the local  levels.  This
 knowledge can be used in the following manner 1)  to select the more favorable areas (i.e.,
 those areas that have a low potential risk of adversely affecting the environment) and, once a
 given area is chosen; 2) to  design the landfill so as to further control the  potential for
 contamination.

This section addresses the following items:

•      definition of major relevant geological, hydrological, and hydrogeological concepts;
                                                                                   6-12

-------
•      the manner and processes by which wastes contaminate the environment;

•      procedures for conducting a geological-hydrogeological study; and

•      description of best case and worse case scenarios.

6.2.2    Definitions
6.2.2.1   Geology
Geology can be defined as the systematic study of the material, processes, environments, and
history of the earth. Although the four are complementary, it is the nature and structure of the
materials themselves that have the greatest impact on a landfill and which, therefore, are the
subject of this chapter.  While specific technical definitions exist for rock and soil, they are
discussed jointly in terms of the relevance and influence on landfill design and in terms  of
geologic  parameters,  such as  permeability.  Rocks, aggregate,  and  soil are commonly
discussed collectively.
       Rock and Soil Types
The rock formations present on the surface of the earth and the soils derived therefrom can be
broadly  subdivided into three  types  (sedimentary,  igneous,  and metamorphic),  each
corresponding to its own mode of formation; all three categories being linked to one another
through the "geological cycle" (see Figure 6-1).
       Sedimentary
Sedimentary rock and soils are primarily derived from the destruction (erosion or chemical
dissolution)  of pre-existing  rock formations, and  their transport and deposition in layers,
generally at the bottom of seas or lakes and rivers.  Deposition can also take place directly  on
the surface, such as is the case with aeolian sandstones.
                                                                                  6-13

-------
                                                        Metamorphic
                                                          rocks
                                        Thermal effects
                           Figure 6-1. The Geological Cycle

 Sedimentary rock and soils include conglomerate, sandstones, limestones, chalk, clay, and
 others.
       Igneous
 Igneous rock and soils are formed by the cooling of melted magma as it rises to the surface of
 the earth.  The original composition of the melted magma will determine the final characteris-
 tics of the cooled rock and their resistance to weathering and fracturing.
 Rapidly moving, low-viscosity magma generate the classic volcanic eruptions  (basalts, ruffs).
 Cooler, thicker magma do not move so easily and stop below the surface, where they form
 coarser rock.  This rock becomes exposed on the surface  through erosion.  Granites  are
 formed in this manner.
       Metamorphic
Metamorphic rock formations result from the  transformation  through heating or regional
pressure of existing rock (igneous or sedimentary).  The heat and/or pressure applied on the
rock can result from the burying of sediments  into the depth of the crust, from deformation
                                                                                  6-14

-------
during the development of mountain  ranges, or from the proximity of rising  igneous rock.
Examples of metamorphic formations include schists, marbles (transformed limestones rock),
and gneisses (transformed igneous rock).

A very important  distinction  can be  made  between the "hard rock" (basalts,  limestones,
granites, some sandstones) and the "soft rock" (chalk, clays, soft sand,  gravel, weathered
granites or basalts).  Areas having a relatively high concentration of hard rock  are not easily
amenable to earth moving equipment  and thus are more expensive to work than areas with
soft rock and thick soil cover.  Soft rock and soils generally can be removed with the use of
earth moving equipment
       Geological Hazards
As was previously indicated, geology deals with the  study of processes involved in the
development of the earth.   Most of these  processes are slow  (e.g.,  erosion,. mountain
formation).  However, some are very rapid and can drastically alter the surface of the earth.
The probability of such processes,  grouped under the term geological hazards,  to occur must
be assessed when looking for a potential landfill site. The most common geological hazards
are listed below:

•      floods;

•      avalanches and lahars (for obvious reasons, but avalanche  paths can  be easily
       forgotten, as was the case recently at a French ski resort);

•      active seismic zones; and

•      fault zones, including  inactive zones since  they would act  as  preferential water
       pathways.
                                                                                 6-15

-------
       Permeability
 Permeability is a term expressing the rate at which water passes through a given medium
 (substrate).  It can be used to describe fluid movements in rock, cement, and other materials.
 The rate of liquid flow through a medium is fundamentally a function of the characteristics of
 the medium and  the hydraulic  pressure gradient.   The  discussion below  refers to  the
 permeability of liquids in fractured rock and soils and, consequently, the values of permeability
 given  in the text relate to the movement of liquid, not to the movement of gases under a
 pressure gradient.

 Permeability (k) is expressed in m/s, or cm/s; the greater the value, the more permeable is the
 substrate.  For example, a highly permeable soil, such as gravel, has a permeability of about
 10"* m/s. At the other end of the spectrum, day is poorly permeable (commonly termed, incor-
 rectly, impermeable) and has a  permeability in the range of 10~9 to less than  10~10 m/s [1].
 Water can percolate through clays but at a very slow rate.

 Soils can be broadly classified on a permeability scale as follows:
Highly
permeable
Gravels
Permeable
Sand
fractured rock
Slightly
permeable
Sandy days
weathered rock
Poorly
permeable
Clays
Examples of typical values of permeability are given for these soil types in Figure 6-2.
However, a given soil type cannot be automatically assigned a definitive k value.  The perme-
ability of a material depends on local homogeneity of the substrate (e.g., day mixed with sand
or vice versa), its degree of fracturing, and its state of alternation. Therefore, permeability (k)
must always be checked and measured in situ to determine the correct local value.
                                                                                  6-16

-------



1
•



*'
^•^•MHMI




•»••*•














•••••••


••
mm^mmmfmm
^v«*«
V ,
•^^^^^•H
i^MHMHMi
••»*•

•4MHBBMI
••••**
• ••


{^^••••tt



O'10 ID"8 ID"6 10-1 10'2
k(m/s)
SOIL
CLASSIFICATION
Gravel
Sandy gravel
Gravelly sand
Coarse sand
Medium sand
Fine sand
Silty sand
Silt
Clay
                         Figure 6-2. Examples of Permeabilities

       Geological History
 In order to identify the most favorable area for the siting of a landfill, it is necessary to have a
 good understanding  of the  historical  development  of  the geological features.   Such  an
 understanding allows the identification of the geological hazards previously mentioned.
 The understanding of the geological history of an area is achieved through the careful analysis
 of geological  maps,  and  when these are inadequate  or non-existent, through geological
 mapping and drilling.  For instance, the study of a geological map can show the existence of
faults under a thin sedimentary cover (not visible on surface); analysis of sedimentary patterns
indicates which zones are  likely to be homogeneous, permeable, or impermeable; and a study
of the geomorphology of rivers, terraces, and recent deposits indicates flood plains.
                                                                                  6-17

-------
6.2.2.2    Hydrology
Hydrology  is  the science  that  studies  the  processes  involved  in  the  depletion  and
                   \
replenishment of the water resources. These processes can best be understood by examining
the water cycle presented in Figure 6-3.
                                                             Cloud formation
                                                                	X1
                                                                Evaporation and
                                                          /Saline;
                                                          
-------
runoff or it may enter the ground as infiltration. The surface runoff may then return to storage
in lakes and oceans. The water that infiltrates the soil will either be taken up by plant roots
and transpired to the atmosphere, or percolate downward through the unsaturated zone and
into the water table.  The groundwater may then move toward surface discharge points (spring,
etc.), where it will become a component of surface runoff moving toward the oceans and lakes.
As far as landfill siting and design is concerned,  the following data need to  be recorded and
assessed.
       Climate
Wind, rain or snow, and temperature are climatic conditions that may dictate the type of
operation, amount and placement of soil cover, types  of roads needed, and type of structures
built on a landfill.   Hence, to aid in selecting a site for a landfill, it is imperative to have
information on:  1) the number of days of wind, freezing temperature,  rain or snow; 2) the
intensity, of precipitation; and 3) the seasonal temperature fluctuations.
Precipitation must  be considered  with  regard  to surface water runoff, drainage system
requirements, leachate generation, feasibility of sustaining operations at all times on-site,
movement of equipment, and access to and from the site.  For instance, low-lying sites that
might frequently flood or become muddy during rainy weather should  not be chosen in areas
subject to rainfall of frequent duration.
       Climate and Degree of Infiltration
Climate is significant because of its direct bearing  on the amount of rainwater that may
infiltrate through the  unsaturated zone and into a  groundwater system. Degree of infiltration is
a function of the amount of precipitation, volume of surface ponding and runoff, and the
evapotranspiration rate.  Ambient temperature and relative humidity also  have an impact on
infiltration, evaporation, and evapotranspiration.  The potential for groundwater degradation
                                                                                  6-19

-------
 from a well-designed and well-constructed landfill in arid and semi-arid regions is quite low,
 whereas the potential is quite high in humid regions.  Another decision factor in  selecting a
 suitable site is the consideration of the seasonality of rainfall.
        Stream Density
 The likelihood of surface water contamination increases in areas in which an unusually short
 underground flow path precedes the discharge of contaminants into an area in which streams
 are closely spaced [2]. However, the overall extent of any groundwater contamination may be
 limited by subsurface media.   Alternately,  widely spaced streams  may also lead  to the
 development of larger and longer-term groundwater contamination zones.
 6.2.2.3    Hydrogeology
 Hydrogeology can  be defined as the  study  of groundwater and its chemistry,  mode  of
 migration, and relation to the environment. The relationship of groundwater to the water cycle
 can be seen in Figure 6-3.  The possible effect of a landfill on the groundwater regime should
 always be carefully evaluated.

 The main  terms and parameters necessary  to understand  and  assess the groundwater
 systems are as follows:
                                                  i
 •      aquifers,

 •      recharge and discharge zones,

 •      saturated/unsaturated zones,

•      hydraulic conductivity, and

•      porosity and velocity.
                                                                                  6-20

-------
       Aquifer
An aquifer is a body of rock or soils containing water with sufficient permeability for the water
to flow. Three types of aquifers can be distinguished:
1.     Sandy Aquifers - In this classification of aquifers, water flows through the voids in
       between the grains (the intergranular porosity).  Such aquifers can be found in sands
       and gravels. The intergranular porosity is described schematically in Figure 6-4.
                                  (sand, gravel, day)
                            Figure 6-4. Intergranular Porosity

2.     Fractured Aquifers - These aquifers occur in fractured, poorly permeable rock such as
       sandstones, chalks, limestone, and volcanic rock.  The water flows through intercon-
       necting fractures and  cracks (the fissure porosity). A schematic diagram of the fissure
       porosity is presented in Figure 6-5.
                                                                                    6-21

-------
 3.     Mixed Aquifers - These aquifers contain  both fissure and intergranular porosity and
       occur in a karstic environment. A karstic aquifer is depicted in Figure 6-6.
                                (chalk, sandstone, limestone)
                              Figure 6-5. Fissure Porosity

The infiltrated water reaches the aquifer more or less rapidly, depending on the permeability of
the rock and soils it encounters.  Through chalk, for example, infiltrated water can take up to
one year to reach the underground water.  In schist and granite,  in principle impermeable rock,
water nonetheless can percolate very quickly through the fractured or weathered zones.
                                                                                   6-22

-------
                                                            Water table
                                                                        Fractured
                                                                        limestone
        Intergranular
        porosity
   Discharge
   point
                    Fissure
                    porosity,

                               Figure 6-6. Karstic Aquifer

       Configurations of Aquifers
 Aquifers are classified as unconfined or confined, depending on the conditions at the boundary
 of the formation.
 A confined aquifer is bound by two impermeable layers.  The water is under pressure and,
 consequently, the water  level will rise in a bore hole sunk into the aquifer.  The level to which
 the water rises in  a bore hole is called  the  piezometric level.   A schematic diagram of a
 confined aquifer is presented in Figure 6-7.
 An unconfined aquifer is one in which the water table (or piezometric level) is not constrained,
 and therefore the water level is free to fluctuate up and down, generally seasonally (see Figure
 6-7).
       Recharge and Discharge Zones
As seen in the water cycle (Figure 6-3), aquifers are filled (recharged) through the infiltration of
rain water through permeable strata (Figure 6-8).  Upon reaching the aquifer, the water flows
                                                                                   6-23

-------
                 Piezometric level
                If
Water level in bore
hole (piezometric level)
                         Level of water table
                         Unconfined aquifer
          - — •   —  • Confined aquifer —  -   —  - —  -  — -  — -
                            Impermeable layer
           Figure 6-7. Schematic Example of Confined and Unconfined Aquifer

 under the regional hydraulic gradient and is discharged to the surface environment again by
 way of springs, from seepages into rivers, and by means of pumped wells [3].
 Water is not stagnant within an aquifer, but flows from the recharge to the discharge zone.
 Rates of flow vary according to the type of aquifer for example, 1.5 km/yr in  alluvium and 3.5
 to 9 km/yr in a karstic system.
       Saturated/Unsaturated Zone
 In an unconfined aquifer, two successive zones  are encountered by the water percolating
 downward from the surface:

The unsaturated zone is composed of rock interstices that are partially occupied by water and
partially by a gaseous phase (air).
                                                                                 6-24

-------
           Rain
Evapotranspiration     Rain
                         Plant
                         transpiration
Evapotranspiration
                                   Runoff
                                   water
           Dry Season
                                                    Runoff
                                                    water
                          Rainy Season
                        Figure 6-8. Recharge of Aquifers by Rain

The saturated zone starts at the level of the water table when the rock and soil interstices are
entirely filled with water.  In this zone, the groundwater flows under the regional hydraulic
gradient to the discharge zone.

In both the unsaturated and the saturated zones, different complex mechanisms can interact
with a  percolating  fluid  (leachate or other pollutant): sorption,  neutralization, precipitation,
oxydo-reduction, and biodegradation. Although these mechanisms have been observed, they
are yet to be precisely quantified and understood.
       Hydraulic Conductivity. Porosity. Velocity
Hydraulic conductivity and  porosity are commonly used to characterize soils, and all three of
these terms are used to characterize aquifers.  Before defining  them, one must, first of all,
understand the most important law governing the transmission of fluids through soils - Darcy's
                                                                                   6-25

-------
 law.  Darcy's law allows the calculation of the rate of flow of a fluid (Q) through a given cross-
 sectional area of a soil, as depicted in Figure 6-9.
   H2O
                                                                                   H2O
                 Figure 6-9. Depiction of Fluid Flow in a Porous Medium
The equation of Darcy's law is as follows:
       Q = k-S-i
where:
       Q = discharge (mis),
       k = permeability or hydraulic conductivity (m/s),
                                                                                   6-26

-------
       S = cross-sectional area, and

       i = hydraulic gradient.

An example of the method of applying Darcy's law is given in Figure 6-10. Assume that there
are 2 m of water-logged waste over a surface of 1 km2 (i.e., 106 m2) overlying 5 m of clay with
a  permeability of k = 10"12 m/s.   The flow of water through the "impermeable" layer can be
described as follows:

       Q - 10'12 m/s x 106 m2 x 7/5 = 1.4 x 10* m3/s = 44 m3/yr
Hydraulic conductivity is synonymous to permeability (k) previously defined.
Porosity is the measure of the interstitial pore space, expressed as the relative volume (in %)
of rock or soil occupied by voids.  In actuality, part of the water present in the voids is retained
by forces of molecular attraction, adhesion, and cohesion and, therefore,  is  unavailable to
store tree" water. Thus, in terms of actual storage potential, the use of effective porosity (n),
i.e.,  the free storage  space, is more appropriate.  For example, while clay has a high total
porosity, it has a low effective porosity (see Table 6-1).

6.2.3     Risks of Water Contamination by Waste
6.2.3.1    Surface Water Contamination
The main risks of surface water contamination (see Figure 6-11) are listed below:

1.      If a land disposal facility is located below flood level, each  flood will penetrate the
       waste, flow across the landfill, and disseminate polluted water.  In some cases, flooding
       will carry the waste into the river system and surrounding  area.  Consequently, flood
       plain areas must be  identified and generally avoided.
                                                                                   6-27

-------
                                              Rainwater
                              -Q-ksi
                                = kS /!H/L
                               k=10"12m/s
                               S-1km2 =106m2
                             * H * 7m
                               L = 5m
                               Q * 1012x 10* x 7/5 « 1.4 x 10"" nr3s
                                = 44 rruyear
                         Figure 6-10.  Application of Darcy's Law

2.     Similarly, a disposal facility in close proximity to the sea represents a potential source of
       pollution to the sea water and to nearby beaches during high tides.

3.     A disposal facility in  dose proximity to a source of surface water, e.g., a river or lake,
       represents a source of pollution as  a consequence of the potential of seepage of
       leachate from the base of the landfill to the body of water.
                                                                                    6-28

-------
                     Table 6-1. Porosity Ranges, Flow Types, and
                Saturated Hydraulic Conductivities of Various Soil Types
Soil Type
Clay
Chalk
Sand
Gravel
Sandstone
Shale
Limestone
Igneous and
Metamorphic
Total Effective
Porosity Porosity
Range % Range %
45 to 55 1 to 10
35 to 50 0.5 to 5
35 to 40 10 to 30
30 to 40 15 to 30
10 to 20 5 to 15
1 to 10 0.5 to 5
1 to 10 0.5 to 5
(probably less than 1)
Flow
Type
I
F+l
I
I
F-H
F + l
F(+l)
FM>
Saturated Hydraulic
Conductivity Range
m/d
10'2to10*
10 to 10"3
10to1
10*1010
10 to 10'1
1Q-1 to 10'7
wide
wide
     F  =  fissure flow
     I   =  intergranular flow

6.2.3.2    Groundwater Contamination
Several types of situations can result in groundwater contamination:
1.     A landfill with a permeable base located in the water table - the unsaturated zone is
       non-existent, and the leachate percolates directly into the aquifer, creating a plume of
       pollution that can diffuse widely.
2.     A landfill with a  permeable base located above a fractured zone  of permeable soils
       such as sand or gravels - leachate will reach the aquifer directly and quickly through
       the fractures or the permeable soils.
3.     Leachate can  reach an aquifer through heterogeneities  and discontinuities  in an
      otherwise impermeable zone (for example, along a fault zone, or along a thin limestone
      layer within a day horizon).
                                                                                  6-29

-------
                                     Landfill
Flood plairf    Water table'
                            River ^ Normal river level
 Seepage of leachate into the rive
    Figure 6-11.  Risks of Surface Water Contamination
                                                                    6-30

-------
 6.2.4     Procedure for Conducting a Geological/Hydrogeological Study
 6.2.4.1   Regional Study
 In order to conduct a regional study, the following information should be collected:
 •      the  geology of  the  area  in order  to identify fault zones, impermeable areas,
       heterogeneities, and others;
 •      the geomorphology of the area, to identify geological hazards such as flood plains and
       to delineate the water basins; and
 •      the hydrology of the zone so that all of the aquifers can be identified together with the
       surface water network and the water flowing direction.
 The above information can be gathered from existing maps, aerial photos, boreholes, and field
 work.
 6.2.4.2   Local Study
 The following data should be obtained during the conduct of a study of local conditions:
 •      detailed geology (including the availability of on- or off-site soils for construction and
       maintenance of the landfill),
 •      an inventory of springs and water boreholes,

 •      detailed hydrogeology (depth to aquifers, piezometric levels, water quality), and
 •      permeability of the different formations.

The above data can be obtained by  using the following methods:

•      detailed geological mapping;

•      drilling and careful logging of the core;
                                                                                  6-31

-------
 •      installing  "piezometers"  in several boreholes and monitoring the water  movement
        (existing piezometers can also be used if they are operational);

 •      analyzing the water in the piezometer - the drilling and installing of a piezometer
        requires the skill or supervision  of  a  trained specialist.  Incorrectly installed  and
        monitored piezometers can result  in costly mistakes (for example, missing  an aquifer
        altogether or tapping the wrong aquifer); and
 •      measuring the  permeability  in  situ of the  surface  and subsurface  soils - these
        measurements should be made and interpreted by specialists, and the interpretation
        should be linked to the geological mapping.   An awareness should be had  that
        permeability is potentially variable  in a formation and the  potential of variability is the
        reason that professional interpretation should be sought  For example: 1) layers of
        material with k = 10'9 m/s can occur within a formation of siltstone (k = 10"6 m/s), or 2) a
        thick clay formation  (k  = 10'12 m/s) can  be locally fractured, which increases k
        significantly, or it can contain sand  lenses (k = 10"4 m/s).
 6.2.4.3    Best Case/Worse Case Scenario
 One   effective  means  of  evaluating   the   data  and  information  collected   in  the
 geological/hydrogeological study and of providing a context for selecting the optimum site is to
 define the ideal and the worse locations for a landfill.
       Best Case Scenario
 •      geologically stable area (i.e., no active fault movement),

 •      impermeable strata at the base of the landfill,

•      unsaturated layer below landfill base (more than 30 m),

•      far from surface water bodies (more than 1,000 m),
                                                                                    6-32

-------
•      low hydraulic conductivity in the first underlying aquifer to minimize the  migration of
       potential contamination, and

•      nearest aquifer far below the landfill base and not used for drinking purposes.
       Worst Case Scenario
•      many permeable layers (gravel pits, fractured zone, fault zone);
•      bottom of the  landfill  is  close to  the water table, or depth from ground surface  to
       groundwater is less than 10m;
•      local groundwater is used for drinking; and
•      close to surface water body or flood plain (within 100 m).
In reality, of course, compromises will have to be made in the selection of a site since all of the
ideal conditions are seldom found at a given  location [4].  However,  the  identification and
assessment  of all relevant  factors will enable  landfill developers and designers to take the
factors into account and to include appropriate measures when the actual conditions fall short
of the ideal.
6.2.4.4   Conclusion
An understanding of both regional and local geological conditions is a prerequisite to ensure
the selection of the best available site in a  given area and to assess the potential risks of water
contamination from the landfill site. With  such  knowledge, it is then possible to minimize the
risks with the design  of the landfill.  Consequently, geology and hydrogeology are part and
parcel of the siting  of a landfill and must be taken into account during the design phase as
well.
                                                                                   6-33

-------
Finally, the hydrogeological knowledge gathered during the siting  phase will also be used
when designing the groundwater monitoring system in place during and after the use of the
landfill.

6.3    Proposed Classification System for Site Selection
Important factors that should be taken into consideration in the selection of a landfill site have
been discussed in the previous sections.   However, the degree of community development
and, most certainly, affordability become important considerations in the process of selecting a
site. By definition, communities in economically developing countries are poor.  Large cities in
an economically developing country, although poor, may have sufficiently large  sources of
revenue to enable them to apply high standards to solid waste disposal.  On the other hand,
small communities usually cannot afford to dispose of their wastes using the same set of high.
standards applied by large cities.

A number of reasons can be  offered that support the  concept that the standards for the
development of landfills in economically developing countries do not necessarily  have  to be
identical to those used by industrialized countries.  Some of the more important arguments for
this concept include the following:

1.     The composition  of the wastes generated  in economically developing countries is
      substantially different from that generated in industrialized countries. As was shown in
      Table 4-3,  some cities in economically developing countries generate municipal solid
      waste that has a relatively high concentration of food waste and has a high moisture
      content.  On the other hand, low-economy communities which use either coal or wood
      for cooking and heating generate a waste that has a high  concentration of ash.  In
      some of these locations, much  of the paper and vegetable matter is also used as a
      fuel.
                                                                                 6-34

-------
2.     The  per capita quantity of refuse  generated in  some of the poorer economically
       developing countries may be smaller than that generated in industrialized countries by
       a factor of three to four.   Consequently,  a community  of  a certain size in  an
       economically developing country may produce substantially less solid waste than a
       community of equal size in an industrialized country. Since less waste is produced, a
       landfill serving the same population would be smaller, or would have a longer life, and
       therefore would represent a smaller or less rapidly accumulating source of potential
       pollution.

3.     The  climate in many economically developing countries  is humid and the potential for
       leachate production high.    On the  other  hand, there are  several  economically
       developing countries that have arid climates or arid regions (e.g., parts of India, Africa,
       and  South  America),  which have  little potential for  the production  of leachate.
       Whereas, in industrialized countries, the same standards can be applied for landfilling
       regardless  of climate, the standards  may be relaxed in  economically developing
       countries if little or no leachate is likely to be generated in the landfills. This relaxation
       can make landfilling more affordable, without unduly affecting environmental protection.

Consequently, a proposal for the classification of landfills in economically developing countries
has been made by members of the ISWA Working Group on Sanitary Landfills [5].  The
proposal  aims  at establishing  graded  standards without  compromising  environmental
protection.   The scheme of classification is  considered  suitable for either industrialized or
economically  developing countries.   However, it  probably  will be  more   attractive in
economically developing  countries where affordability usually  is a fundamental issue.  The
classification applies to landfills that receive only domestic and commercial refuse and  dry,
non-hazardous industrial wastes.
                                                                                  6-35

-------
 Since the classification can be used in  site selection as well as site  investigation and
 environmental impact assessment, it is presented in this section. Due to the importance of
 these aspects of the process for the establishment of a sanitary landfill, a brief description of
 the classification is presented herein.

 6.3.1     Components of the Classification System
 The proposed classification depends upon the evaluation of the following components:  the
                                                                    •*•
 type of waste, the size of the landfill, and the climatic conditions.  A brief description of each of
 the three components follows.
 6.3.1.1     Type of Waste
 In  the proposed classification, the composition  of the waste is considered in terms of  the
 relative concentration of organic matter. If the concentration of biodegradable matter exceeds
 20%  (dry mass), the waste is classified as type "B," or highly biodegradable waste.  On  the
 other hand, if the concentration  of  biodegradable matter is less than 20%, the waste is
 classified as type "b," or low biodegradable waste.  At the present time, the division of less
 than and greater than 20% is arbitrary.
 6.3.1.2    Size of Landfill
 Obviously, the  size  of  operating landfills increases as a  function of time.   One of  the
 characteristics that has the biggest influence on the operation of the landfill, and consequently
 on the need for facilities, equipment, and operating skills, is the rate of deposition of the waste.
 Therefore, this classification is based on the Maximum Rate of Deposition (MRD) in  Mg of
 waste deposited  per year. The MRD is the projected rate of deposition at the end of the life of
 the fill.  The MRD is calculated from the Initial  Rate of Deposition  (IRD) and the estimated
 annual rate of growth or development rate for the community that the  landfill is intended to
 serve.  The IRD can be estimated based on the  amount of refuse entering the site at present
or by using estimated per capita generation rates.
                                                                                 6-36

-------
The MRD can be calculated as follows:

       MRD - (IRD) (1+D)1
where:

       D is the annual development rate estimated for the landfill in %/yr, and
       t is the estimated life of the landfill site in years.
Therefore, the mass of refuse deposited after t years of operation (Mt) can be calculated as
follows:
             (IRD) [(1+ /))'-!]
                    D
Truck scales  may not be available  in many areas, particularly in  small  municipalities, to
accurately determine the rate of deposition in mass units. In these cases, an estimation can
be carried out by using volumetric estimates, number of vehicles entering the site, and  bulk
density of the waste.
The classification according to size is presented in Table 6-2. In the classification presented in
the table, a "Communal" landfill would serve a village having a population of less than 1,500
inhabitants. A "Small" landfill would serve a town of up to 30,000 inhabitants. -"Medium" and
"Large" landfills would  serve cities and  large towns having populations greater than about
30,000 people. Actual per capita waste generation rates or total waste quantities from a given
population vary, and should be used, if available, to arrive at the proper MRD classification.

6.3.1.3   Climate
It has been demonstrated that the quantity of leachate generated  in a landfill depends upon
the climatic conditions in which the landfill is located, the type of waste, the moisture content of
                                                                                   6-37

-------
                    Table 6-2. Proposed Classification of Landfills in
                  Economically Developing Countries According to Size
Landfill Size Class
Communal (C)
Small (S)
Medium (M)
Large (L)
Maximum Rate
(Mg/yr)
of Deposition (MRD)
less than 250
up to 5,000
up to 150,000
over 150,000
              Source: Reference 5.

 the waste at the time of deposition, and the design and operating conditions of the fill.  The
 impact of climate on the landfill can be quantified by conducting  a water balance on the fill.
 Basically, the difference between the net water input and the capacity of the refuse to store it
 will be available to form leachate.
 Evaporation from a water surface can be measured by means of  standard evaporation pans.
 In humid climates, the difference between net water input and water stored will be positive over
 a year or season. In arid climates, the difference will be negative, either over the entire year or
 over a  particular season.  Thus, in arid climates, landfills may not produce any  significant
 quantities of leachate, produce leachate only seasonally, or produce leachate only as a result
 of the burden of the waste deposited in the fill.

 In the situation where no significant quantities of leachate are produced, the proponents of this
 standard suggest that it may be possible to relax the standards required for the siting and the
design of a landfill,  by  ignoring potential pollution due to the leachate and by omitting the
leachate collection system and landfill liner. This situation, however, will depend on geological
and groundwater conditions at the site.
                                                                                   6-38

-------
 However, even in an arid climate, there  are  occasional wet years.   If extreme  weather
 conditions occur,  some leachate may be formed and may  seep into the soil beneath the
 landfill.  Provided  that this does not occur more frequently than once in five years and if the
 foundation strata are relatively impervious, so that there is some degree of attenuation, the
 consequences of such an escape may not be serious and potentially may be ignored.
 The proposed classification  system uses a simple climatic water balance as a  means of
 deciding whether or not a landfill will generate significant quantities of leachate and, therefore,
 whether or not a leachate collection system and bottom liner should be included in the facility.
 The climatic water balance can be expressed in the following manner
       W=R-E
 where:
       W is the quantity of moisture either lost or retained in the waste (mm),
       R is the precipitation (mm), and
       E is the evaporation from the landfill (mm).

 In the  above equation, runoff of precipitation has been ignored.  According to the proponents
 of the classification, this approach is not only conservative, but is also realistic for most landfills
 in economically developing countries and in industrialized countries where the capping layers
 are semi-pervious.  The  lack of runoff occurs because,  in many locations, about 85% of
 individual 24-hour  rainfall events consist of less than 10 mm.  This  relatively small  amount of
 rain can easily be absorbed into a semi-pervious layer of soil.  Since the value of W is intended
 to represent the condition of the waste over the long  term, the field  capacity (i.e., moisture-
 holding capacity) of the waste does not appear in the climatic water balance. In order to allow
for seasonal influences and variable weather patterns, W is calculated for the wet season of
                                                                                  6-39

-------
 the wettest year on record.  If the value of W is positive, the indication is that the landfill will
 generate leachate in a wet year. On the other hand, if W is negative, the  indication is that the
 landfill will not generate leachate in even the wettest year.
 Since the  rainfall and evaporation in  any one  year do  not  necessarily correlate,  W is
 recalculated for successively drier years to establish if: 1) W is positive in  less than one in five
 years for which the  data  are available,  or 2) if W is positive in more than one year in five.
 According to prevailing conditions, the value of one year in five can be modified to  one year in
 ten or more, depending upon local climatic and hydrogeological conditions and environmental
 concerns.  If W is positive in  less than one in five years, the site is classified as W- (W
 negative) and a leachate collection system and bottom liner can be omitted.  However, if W is
 positive in more than  one year in five, the site is  classified as W+.  In  this particular case,
 generation of leachate can be expected, and a leachate collection and extraction system, as
 well as a bottom liner, should be incorporated into the design.

 6.3.2     Classification System
 Use of this classification system would allow the determination of the need for liners, leachate
 collection systems, and leachate extraction and treatment systems.  A complete description of
 the classification system can be found in References 5,6, and 7.

 References
 1.     Brink, A.B.A.,  T.C.  Partridge, and A.A.B.  Williams, Soil Survey  for Engineering,
       Clarendon Press, Oxford, England, 1982.
2.     U.S. Environmental Protection Agency, Guidelines for the Land Disposal  of Solid
       Wastes, Federal Register, 1985.
3.     U.S. Environmental Protection Agency, Design, Operation,  and Closure of Municipal
       Solid Waste  Landfills,  Seminar  Publication,  Office  of Research and  Development,
       Washington, DC, EPA/625/R-94/008, September 1994.
4.     Attar, A.M., "Siting  a Landfill: The First Step," World Wastes, 32(13):14-20, December
       1989.
                                                                                  6-40

-------
5.    International Solid Waste Association, Working Group on Sanitary Landfills,  Graded
      Standards of Classification to Allow  for Improved, Affordable Standards  to  be
      Introduced for Landfilling of Domestic Refuse in Developing Countries, Copenhagen,
      Denmark, 1996.
6.    Department  of  Water Affairs and Forestry,  Republic of  South  Africa,   Waste
      Management Series: Minimum Requirements for Waste Disposal by Landfill, Volume 1,
      ISBN 0621-16297-4,1994.
7.    Blight, G.E., "Standards for Landfills in Developing Countries," Waste  Management &
       Research, 14(4). August 1996.
                                                                                 6-41

-------
Chapter?
Infrastructure

7.1    General
This  chapter presents an  overview and  discussion  of  the various  support facilities, or
infrastructure,  that  should  be considered  during  the planning  of  a  landfill  operation.
Infrastructure may include the following:
•      access roads,
•      drainage facilities,
•      scales,
•      utilities,
•      structures,
•      fencing,

•      vehicle washing facilities,

•      hot load areas, and

•      other support facilities (e.g., materials recovery, leachate management).

Many, if not all, of the above support facilities normally are present in a modem sanitary landfill
for an efficient landfill operation.   Many of the topics discussed  in this chapter also  are
discussed in other chapters of the document.
                                                                                    7-1

-------
 7.2   Roads
 Landfill access roads include permanent (all-weather) roads from the public road system to the
 site, permanent roads at the site, and temporary roads to the working face of the landfill.

 If the public road system is paved, it also is a good idea to pave the permanent access road to
 the site. The paved road  section should extend to just beyond the guardhouse or scales, as
 applicable.  Beyond this point, permanent roads would extend to the vicinity of the working
 face, especially if the site  is large.  Where the terrain allows, a perimeter road encircling the
 entire site is  advantageous.   A perimeter access road facilitates maintenance of the site,
 engenders efficient traffic flow, and renders one-way traffic flow a practical option.

 Permanent roads should  be  designed to support the  anticipated volume  and loading of
 vehicular traffic and pedestrians.  In all cases, traffic flow  patterns should  be designed to
 minimize conflict between pedestrians and vehicles.  Entry and exit turns against oncoming
 vehicles should be avoided as much as possible, and provision of safe sight distances should
 be considered in the layout of roads. The use of one-way traffic patterns can reduce the risk
 of collisions, while at the same time serving to aid the efficient flow of traffic.

 Adequate roadway drainage should be provided  to prevent the roads from flooding during wet
 seasons, and should be coordinated with the landfill drainage system design.  Ideally, the
 roadway should consist of two lanes (minimum total width, 7.5 m) for two-way traffic.  Grades
 should not exceed motorized equipment limitations (uphill  grades, less than 7%; downhill
 grades, less than 10%). Although the initial cost of on-site permanent roads may be higher
 than that of  temporary roads,  the difference  is  more than compensated by  savings in
 equipment repair, maintenance, and time.

 If the expected delivery vehicle traffic is only 25  to 50 trips per day, a graded and compacted
soil usually would suffice in dry conditions. Traffic consisting of more than 50 trips per day
                                                                                   7-2

-------
probably would justify the use of calcium chloride as a dust inhibitor, or of binder materials
such as soil cement or asphalt.  Traffic consisting of more than 100 to 150 round trips per day
would indicate the need for a paved surface with a base course, binder, and wearing course.

Because the location of the working face is constantly changing, roads for the delivery of
                                                              r
wastes from the permanent road system to the working face usually are temporary in terms of
nature and construction.  The relocation of temporary roads from time to time, over previously
filled areas, generally is necessary and is desirable since the truck traffic helps to compact the
landfill.  Temporary  roads may be constructed on the landfill by compacting the soil cover
already present.  The roads may be topped with a layer of tractive material (such as gravel,
crushed stone, cinders,  broken concrete, mortar, or bricks), as moisture conditions  dictate.
Lime, cement, or asphalt binders would increase the serviceability of the temporary roads.
The design of roadways for access to and about the site should be  predicated upon the
conditions peculiar to the level of local development, and more specifically to those of the
community  being  served by the disposal site.  For example,  the  construction of  a large
capacity, modem sanitary landfill in  a  developing country would be  confined mostly to the
relatively large urban communities, i.e., metropolitan areas and capital cities - at least for the
near future.  The solid waste generated  in many of the large urban communities is collected by
conventional waste  collection  trucks.    Thus,  landfills  serving  these communities  should
accommodate these types of trucks. At the same time, since most large urban cities, even the
more economically developed,  have sizeable economically depressed areas, the traffic  to,
from, and on the landfill  also will  include a range of transport vehicles that extends from the
very primitive (e.g., animal- and hand-drawn carts) to the relatively modem  (e.g., automobiles
and  pickup trucks).  This wide variation of types and number of vehicles  contributes to the
complexity of road planning, design, and regulation of traffic.
                                                                                   7-3

-------
 Since scavenging is an activity that usually would be present at a land disposal facility, the
 accommodation of the additional traffic from this activity also should be considered during the
 design of the roadway system. Scavenging is discussed in Chapter 15.

 7.3   Drainage
 Generally, water has a substantial adverse impact on landfills, at all stages of completion.
 Water interferes with construction and operation by reducing traction, particularly in rendering
 clays slippery and difficult to work.  Water also promotes leachate generation.  In the previous
 subsection, there was reference to roadway and landfill drainage.  Generally, site drainage
 should be regarded as an integral part of landfill design. The facilities and structures needed
 for proper management of stormwater run-on and runoff must be correctly sized, constructed,
 and maintained for the duration of landfill operations [1].
 The landfill site plan should include all essential features for drainage control: ditches, culverts,
 armored channels, retention ponds, outfall structures, etc.  The location of these facilities
 requires careful consideration and will influence  the  layout of  the  landfill  itself.  Retention
 ponds or sediment basins, in particular, may have substantial area! requirements and must be
 provided in downgradient locations on the site.  If the landfill property is of small size, it may be
 necessary to consider the  use of adjacent land  area  for  the purposes of stormwater
 management.  Drainage facilities must be large enough to accommodate  the design storm
 event, typically  a  25-year, 24-hour rainfall. A more complete description  of surface water
 management is presented in Chapter 8.

 7.4    Measurement of Weight (Scales)
An accurate knowledge of the gravimetric and volumetric amounts of wastes delivered to the
disposal  site is an essential element in the development and implementation of solid waste
collection and landfilling strategies,  as well as in the regulation and  control of the  landfill
                                                                                    7-4

-------
 operation.  Volume estimation of incoming waste  is subjective  and as  such is prone to
 significant inaccuracy;  therefore, to the  extent feasible, all  incoming wastes should  be
 weighed.

 Types of scales  range in complexity  from highly  automated electronic  scales  to  simple,
 portable  beam units.  The platform, or scale deck, may be constructed of wood, steel, or
 concrete.  The scale should be able to weigh the largest vehicle that will come to the landfill on
 a routine basis; 30 to 60 Mg would be adequate in most cases. Ideally, the platform should be
 sufficiently long to accommodate all axles of the vehicle simultaneously.  An alternative, if
 financial  resources are limited, is the use of a shorter scale in which  the weight on the front
 axle and on the rear axle is measured. An example of a truck scale is presented in Figure 7-1.
 Scales usually are located near the landfill entrance or the guardhouse, on a turn-out from the
 main access road. The location and design of this area should accommodate vehicles that are
 waiting in line to be weighed.

 7.5   Utilities
 Ideally, electric, water, communication, and sanitation services should  be provided at the
 disposal site.  However, the likelihood of all of these utilities being available at a disposal site in
 an  economically developing country is  unlikely.  Electricity is to be used for illumination and
 power.  These two uses are almost essential if equipment maintenance and repair are to be
 conducted at the site.   Electricity can be generated at the site by means  of a  portable
 generator. Water should  be  available for drinking, firefighting, dust control, and employee
 sanitation. In the absence of access to a sewer, domestic wastewater can be discharged into
 a septic system with a leaching field. Where flush toilets are not practical, ventilated latrines
should be constructed.
                                                                                    7-5

-------
    Scale Pit Under Construction
         Completed Scale
Figure 7-1. Examples of Truck Scales
                                                       7-6

-------
7.6   Structures
If technical and economic feasibility permit, a structure or structures should be erected to
provide office space; to house employee facilities; to provide a sheltered area for equipment
storage, maintenance,  and repair; and to serve as a scalehouse.  If these facilities are not
provided,  operation  of the landfill  will  be impeded.   The  office space is  needed for
recordkeeping and for the conduct of clerical activities.  The equipment structure serves as a
garage and repair shop.  Employee morale, well-being, and productivity would benefit if the
structures also include a health clinic, personnel facilities (e.g., toilets,  lockers), and a food
service facility.  Buildings that will  be used for less than ten years should be of temporary
construction and, preferably, be portable.

The  design  and  construction of all buildings should take into  consideration landfill gas
movement and differential settlement of the fill. In general, construction on the landfill should
be avoided.   As the landfill ages, differential  settlement can cause irreparable damage to
building  foundations.  If it is  necessary to place a  permanent structure on a landfill, it will
require special foundation design - usually a pile foundation penetrating to firm subgrade soils
or bedrock under the landfill.

Whether temporary or permanent, any structure on a landfill may be subject to the hazards of
landfill gas. Gas emanating from the landfill may find its way into a building through cracks in
the foundation or other openings.   Even  buildings  outside of the waste boundary can  be
affected  by landfill gas migration into these structures via pathways through the  soil,  utility
trenches, etc.   It is important, therefore, that any structure  on or near the landfill  have
provisions for detecting and preventing/controlling the accumulation of landfill gas.   Ignition
                                          /
sources,  such as heaters and open flames, may cause gas explosions and must be restricted
from  any area where landfill gas  may collect.  The issue of landfill gas management is
considered in greater detail in Chapters 8 and 14.
                                                                                    7-7

-------
 7.7   Fencing
 Access to the landfill operation can be controlled by erecting a fence around the site.  The
 fence does the following:
 •     keeps out children, as well as dogs and large animals;

 •     screens the landfill;
 •     delineates property lines; and
 •     helps to control wind-blown litter.
 While a perimeter fence for a large site may not be practical, fencing should be considered for
 small landfills.  The type and height of fencing are determined by the available resources and
 conditions prevailing at the site.
 Litter fences may be erected in the immediate vicinity of the  working face to control blowing
 paper and other litter. A low (about 1 m) fence usually suffices at a sheltered trench operation;
 whereas a 2 to 3 m height may be necessary at an operation located in a windy area. Litter
 fences placed near the working face are intended to be movable.  Typical portable litter fence
 installations are presented in Figures 7-2 and 7-3.

 Permanent fitter fences are sometimes erected along the downwind side of the landfill to keep
wind-blown materials from entering adjacent properties.  An effective litter fence  of this type
can be constructed simply and economically with netting suspended between tall  (5 to 10 m)
vertical posts. Also, tall plants or trees and earth berms on the upwind side of the landfill may
serve as both windbreaks and visual screens.
                                                                                     7-8

-------
                        Figure 7-2. Portable Litter Control Fence

 7.8   Vehicle Washing Facilities
 Provisions for vehicle washing should be included in the facility design if the water supply is
 adequate to support such an operation. Vehicle washing refers to the general cleaning of dust
 and dirt from landfill equipment, and to the washing of collection truck wheels.  The require-
 ments for vehicle washing are: a reliable water source, a pump or other means of providing
 pressurized water spray, and a designated washing area (or areas) with runoff control.

 The washing area should have a paved surface to prevent mud formation.  The area should
 have curbing or berms to direct the runoff to a collection channel.  As is the case in the design
of all other drainage systems at the landfill, channels should be protected from erosion. The
sediment-laden runoff should be directed to a sediment trap or basin.  Often, it is possible to
direct such runoff  to the major landfill drainage and erosion control system.   A stormwater
                                                                                   7-9

-------
                                                                     Working face
                Figure 7-3.  Correct Positioning of Litter Control Fencing
                          in Accordance with Wind Direction
 detention basin or a storage pond used for fire protection may serve double-duty as a water
 supply for vehicle washing.
 Vehicle washing facilities  normally are  located near the equipment storage area and landfill
 exit.  Wheel washing of refuse haul vehicles is desirable where the landfill access and public
 roads are paved, to keep  the road surfaces dean.  The areas for landfill equipment washing
 and collection vehicle wheel washing may be the same; if not, they should be adjoining. The
 logical location for wheel washing is on the exit side of the working face area and located on a
 paved area that is adjacent to the paved roadway that leaves the site property.  Mechanical
wheel washing devices are sometimes used at larger facilities.

7.9    Hot Load Areas
Good management practice dictates that all incoming loads of refuse be inspected on the truck
before delivery to the working face.   Any load that is smoldering or on fire, or that contains
                                                                                 7-10

-------
radioactive material, should be sent directly to a hot load area.  In  the hot load area,  the
material is dumped so that the fire can be extinguished or, in the case of radioactive material,
left undisturbed until trained personnel arrive to handle the material. The hot load area should
be located a short distance from the inspection checkpoint, but away from the area of high
traffic frequency and away from personnel facilities. The hot load area should consist of bare
ground stripped of all vegetation and combustible material, and should be a minimum of 10 m
x 10 m in size.  A hydrant and pressurized water delivery system should be provided at this
location.  A storage pond or other water source should be available at all times for  fire
protection.

7.10  Other Support Facilities
Other infrastructure may be provided at the landfill to support such operations as:
•     materials recovery (scavenging, recycling),
•     handling of special wastes,
•     leachate management, and
•     landfill gas management.

7.10.1    Materials Recovery
If a  materials recovery  operation is to  be included at the landfill  site,  careful  consideration
should be given to traffic control and to the location of recycling  or  scavenging operations.
The planning of a materials recovery operation should be developed from the outset of the
project and  incorporated into the overall facility site plan and operating  plan.  A  detailed
discussion of materials recovery is presented in Chapter 15.
                                                                                  7-11

-------
 7.10.2    Special Wastes
 Special wastes referred to  in this document include hazardous wastes and some types of
 sludges.  These types of waste require special provisions for handling and disposal.  In the
 case of hazardous wastes, disposal should be conducted in a hazardous waste landfill,  if
 possible, separate from municipal solid waste.  Hazardous waste landfills are considered at
 greater length in Chapter 8.

 7.10.3    Leachate Management
 The management  of landfill leachate is an issue for all landfills, but is most relevant to facilities
 that are constructed with bottom liners.  Lined landfills must have provisions for collecting and
 treating the leachate. At such facilities, the landfill infrastructure typically will include leachate
 pumping  stations  and treatment works. In heavily urbanized areas, a public sewer may be
  *
 available near the landfill; in which case, the leachate might be discharged to the municipal
 wastewater treatment system.  Pre-treatment of the leachate before discharge to the public
 sewer might be necessary in order to protect the operation of the public treatment works.
                                  : t
 The location of on-site leachate pumping and treatment facilities should be  incorporated into
 the overall  site development plan from the beginning of the project.   Leachate treatment
 ponds, for example,  may require a substantial land area.  If such facilities are situated on the
 downgradient side of the site, it may be possible to reduce or even eliminate the need for
 leachate pumping.

 Leachate management is discussed in detail in Chapters 8 and 13.

 7.10.4    Landfill Gas Management
 Facilities for landfill gas management may include passive vents, trenches, extraction wells,
collection  piping,  migration  monitor probes, flares, or  energy  recovery devices.   Vents,
trenches,  and extraction wells generally are located within the landfill  area, while the other
components would be outside the waste boundary. As with other infrastructure, facilities for
                                                                                  7-12

-------
landfill gas management should be integrated into the overall site design.  Further discussion

of landfill gas is presented in Chapters 8 and 14.


Reference

1.     U.S.  Environmental Protection Agency, Design, Operation, and Closure of Municipal
       Solid Waste Landfills, Seminar Publication,  Office of Research and Development,
       Washington, DC, EPA/625/R-94/008, September 1994.
                                                                                7-13

-------

-------
 Chapters
 Design and Construction

 8.1    Site Considerations
 The methods and criteria for selecting a landfill site ~have been  discussed in  Chapter 6.
 However,  landfill site  considerations do not end  once  a site has  been selected;  site
 considerations also are important during the  design  of a landfill.   The landfill should be
 designed to fit appropriately on the site and, where aesthetics are a concern, the facility should
 also be designed to blend into the surroundings.  Since no two sites are identical, landfill
 designs can vary substantially, even if the sites  are to provide the same disposal  capacity.
 Site factors that may affect landfill design are topography, subsurface conditions,  size and
 shape of  the property, surrounding land use, availability  of  cover materials on  the site,
 aesthetics, future  land use for  the site and  surrounding  properties,  as  well. as other
 considerations.  While the possible variations and combinations of site factors influencing the
 design  of a  disposal  site are too numerous to describe here,  of relevance  and prime
 importance to the landfill designer is an awareness and accounting of all of the  local  site
 factors as they relate to the development of the landfill.

 The following subsections present the key considerations associated  with site characteristics
 which are also related to the design and construction of a landfill.

 8.1.1      Site Preparation
 Site preparation refers to the various procedures associated with the modification of the terrain
 in preparation for the construction of the landfill.   Depending upon the characteristics of the
 site, this may be minor or major work.  Site preparation would be minor, for example, at a site
that is relatively flat, devoid  of vegetation, and upon which all filling  would occur above the
existing grade.  An example of major site preparation is one in which extensive excavation into
                                                                                    8-1

-------
 the suborder is required or redirection of surface waters is necessary.  Site preparation may
 include the following activities in advance of landfilling:
 •     clearing and grubbing;
 •     provisions for drainage, erosion and sedimentation control, and site access;
 •     excavation and stockpiling of soil; and
 •     grading.
 8.1.1.1    Clearing and Grubbing
 Clearing involves the removal of trees, brush and vines, fallen trees, and other matter such as
 boulders or refuse. Grubbing involves the removal of tree stumps and roots.  Root removal
 typically is performed to a depth of 15 to 50 cm. Clearing should be performed in any area of
 the site that would  otherwise  impede the free movement and operation of vehicles and
 equipment, or would hinder the performance of the landfill.
 All stumps should be removed from cleared areas, an operation that may require the use of
 heavy equipment. Grubbing of roots may .not be necessary in all areas.  Some of the areas
 that may  not require grubbing include those assigned for material stockpile, gravel-topped
 roads, or areas that will receive the landfilled waste. However, any area that will have a landfill
 bottom liner should be thoroughly grubbed to ensure the long-term stability and integrity of the
 liner system.
The relative amount of land area cleared should be kept to the practical minimum to facilitate
supervision of the site and to minimize environmental damage.  At larger sites, clearing done in
increments will reduce  erosion, dust  generation, sedimentation, and will help to prevent
excessive scarring of the land.  It may be necessary to avoid clearing  and grubbing activities
                                                                                   8-2

-------
 altogether during wet periods.  Trees and shrubs at the periphery of the landfill  should  be
 retained to the maximum possible extent.

 In some developing countries, because of chronic shortages of household fuel, a landfill site
 may already have been stripped of combustible vegetation long before it was considered for
 landfilling.  Clearing is likely to be irrelevant in such cases.  On the other hand, in other
 economically developing countries, substantial clearing and grubbing may be  required for
 some landfill facilities in order to take advantage of an otherwise ideal landfill location.
 8.1.1.2    Provisions for Drainage, Erosion and Sedimentation Control, and Site Access
 Adequate provisions for drainage, erosion and sedimentation control, as well as site access
 will be required for the duration of site preparation activities. These provisions may be of a
 temporary nature, as in the case-of a temporary haul road to an on-site borrow pit; or they may
 be developed as permanent support facilities for the landfill operation. Discussion of drainage,
 erosion and sedimentation control, and site access can be found elsewhere in the subsections
 that follow, as well as in Chapter 7.
 8.1.1.3    Earth Excavation and Stockpiling
 The majority of landfill sites require substantial excavation of earth materials in preparation for
 landfilling. The excavated materials generally are used in the construction and subsequent
 operation of the landfill.  The  volume of the  excavation, when backfilled with waste, may
 represent a significant percentage of the landfill's design capacity.

 Because  there  may be a  lapse of several months  or even  years  between  the time  of
 excavation and  the time of use of the materials, a stockpile area of sufficient  size must  be
 provided for these materials. The physical characteristics of the excavated soils may vary to a
 considerable degree from different parts of the landfill site. Therefore, it may be desirable to
 establish  separate  stockpiles for the different types  of materials extracted from the site.
Similarly, separate stockpile areas should be provided for any earth materials imported to the
                                                                                   8-3

-------
 site for the construction or operation of the landfill.  Excavated soils that will not be used onsite
 (i.e., excess materials) potentially may be sold for other purposes, and the revenue from the
 sales used to defray landfill costs.
 Topsoil should be stripped from all areas of the site that will be excavated, or filled with waste
 and covered. The topsoil, which is a valuable resource, will be needed later for final cover and
 restoration of disturbed areas.  The removed topsoil should be carefully stockpiled at the site.
 Precautions should be taken to prevent mixing the topsoil with other soil materials, and to
 prevent the washing of topsoil into excavations or drainage ways.
 In  developing the landfill site, consideration should be  given to the sequence of events
 involved in  site preparation.  It is a common practice to be filling in one phase of the landfill
 while excavating for the next.  The timing of these operations is of critical importance in order
 to operate the landfill  efficiently and economically.  Furthermore, the sequence of excavation
 should be included in the overall plan for managing  surface waters at the site,  to  avoid
 ponding, to minimize erosion, and to avoid disturbance to the active landfill operation.
 8.1.1.4   Grading
 Preparatory grading is the process of contouring the land to create the required base grades
 for the landfill  once  the processes for clearing,  grubbing,  and bulk  excavation  of earth
 materials have  been  completed.   Grading also is performed in the  construction of roads,
 drainage systems, and other landfill support facilities.

 Preparatory grading plans should be developed in concert with the design of site drainage,
 erosion control  measures, and access roads.   The preparatory grading plans should show
 contour elevations for all disturbed areas of the landfill site and should establish minimum and
 maximum slope criteria for all cut and fill areas. Most importantly, the base grades and slopes
for  the  landfill bottom should  be developed only  after careful  consideration of subsurface
                                                                                     8-4

-------
conditions (e.g., soil type and depth to water table) and of the manner in which the area will be
drained.

In the case of constructing a landfill with an impervious bottom liner and provisions for leachate
management, the landfill base must be sloped to facilitate leachate collection.  A minimum
base slope of 2% is recommended. For unlined landfills, the preparatory grading is less critical
but should still be done in accordance with a design plan that eliminates surface irregularities,
controls runoff, and prevents ponding.

8.1.2    Location of Facilities
The site plan for the landfill should include  a detailed layout of the initial and future  landfill
areas and of all major support facilities.  The specific items to be covered in the site plan will
                              •
depend greatly on the physical nature of the site and on the services to be provided at the
landfill.  A detailed discussion of the development  and design of site plans  is provided  in
Chapter 7.

8.1.3    Buffers
Buffers, or buffer strips, are corridors of land outside of the boundary of the solid waste, but
usually within  the  landfill property,  that are left in a natural-looking state to provide an
aesthetically pleasing transition  between the landfill site and the adjacent property.  Buffers
may be established from undisturbed natural areas or from disturbed areas that have been
restored to a natural appearance.  Enhancements may include tall or dense trees to provide
visual screening of the landfill from its surroundings.  Occasionally, screening berms with a
vegetative cover are constructed for the  same purpose. If the surrounding area is populated,
screening berms may also help in controlling nuisance noise from landfill operations.

The wider the buffer zone, the more effective it will  be in isolating  the landfill from bordering
property.  In the United  States, for example,  it is common to establish required setback
                                                                                     8-5

-------
 distances from the landfill to the property line.  At the time of this writing, most economically
 developing countries lack specific regulations of this type, and the provision of buffers around
 the landfill typically is a matter of judgement.  An adequate buffer zone will greatly improve
 public acceptance of the landfill and its operation, and usually is a wise investment to minimize
 future problems regarding groundwater quality and gas migration. Note that, if desired, buffer
 areas can be sold for compatible land uses once the landfill is completed and monitoring of the
 area indicates the absence of groundwater and gas problems.

 8.2   General Design Criteria
 The criteria for landfill design  should  be developed specifically  to meet  the particular
 requirements of a country or  region.   Local factors affecting the appropriateness of certain
 design criteria include climate, characteristics of the waste stream, availability of construction
 materials,  economic resources of the population,  and educational  level  of the workforce.
 However, several  general criteria would apply to the design and construction of landfills at all
 locations.  These  criteria relate to the primary purpose of establishing the landfill, which is to
 protect human health and the environment. Consequently, these criteria may be regarded as
 universal standards.  A brief description of the key criteria  is presented  in the following
 paragraphs.

 8.2.1     Groundwater Protection
 Water resources should be protected by locating the landfill downgradient from major aquifers
 and drinking water supplies. Where  climatic conditions require, and the economic situation
 allows, the landfill should be provided with an impermeable bottom liner to reduce the risk of
 contaminating the  underlying groundwater.  It may be possible to construct the landfill within a
 naturally occurring low-permeability soil layer, which would avoid the high cost of installing an
artificial liner. If  the landfill is constructed without a liner, a minimum separation of 3 m should
be maintained between the bottom of the landfill (and sidewalls in cases where the water table
                                                                                    8-6

-------
has been artificially lowered and an inward hydraulic pressure gradient exists on the sidewalls)
and the high groundwater table and bedrock surface wherever possible, and no water supply
wells should be located within 2 km or so downgradient of the site. An even greater distance
of vertical separation is desirable.

8.2.2     Surface Water Protection
Surface water resources should be protected by preventing contact between surface water
and the wastes in the landfill wherever possible.  Run-on should be diverted from upgradient
areas so that it flows around, rather than through, the landfill.  The landfill  also should be
contoured such that runoff does not drain into the area of the working face or form pools on
the landfill.  All runoff from the landfill  should be directed to  appropriate sediment control
devices, such as basins or traps, to allow suspended solids to settle out  before the runoff
enters natural drainage courses.

8.2.3     Spatial Efficiency
Cuts  and fills should be balanced so that adequate quantities of soil from on-site locations will
be available for construction,  operation,  and closure of the landfill.  The need to import soil
materials for these purposes should be avoided whenever possible. Deeper and taller landfills
generally will be more efficient in terms of space utilization and cost than shallower and wider
landfills of equal capacity.

8.2.4    Slope Stability
Whether during the initial preparation of the site or during operation  of the landfill, slopes
should be designed and established  such that they are stable.  The stability of the natural
terrain, of cut slopes, of disposed wastes, and of mixtures and layered structures of waste and
soil and synthetic materials must all be considered, analyzed, and assured by the facility
design plan.  The  analysis must consider that while the properties of soils generally are
invariant over the lifetime of a land disposal facility, the  properties  of the disposed wastes
                                                                                    8-7

-------
 change because of the effect of landfill processes on them.  The changes in some of these
 properties influence the stability of disposed wastes and, equally important, can influence the
 stability of structures composed of layers of waste, soil, and synthetic materials.  Failures of
 land disposal facilities due to the instability of soil, waste, or both can be catastrophic if the
 quantities involved are large.  Open dumps are particularly susceptible to, and candidates for,
 failures involving waste and soil  since, by definition, they  are not engineered facilities.  Two
 examples of stability failures of open dumps are those that occurred in Sarajevo (formerly,
 Yugoslavia) in 1977 and in  Istanbul, Turkey  in 1993; the latter failure resulted in extensive
 damage to property and 39 human casualties [1].
 The fundamental material properties that govern the stability of sloped structures of waste,
 soils, and synthetic materials are in-place bulk density, friction angle, and intercept cohesion
 [2]. These properties are, in turn, influenced by the moisture content of the materials and by
 other conditions, e.g., compactive effort (for instance, that  exerted mechanically and that due
 to  the overburden), porosity.  Suggested values of friction angle and intercept cohesion for
 municipal solid wastes based on limited data  are approximately 25 degrees  and 30  kPa,
 respectively.  If the in-place bulk density, friction angle, and intercept cohesion are known or
 determined, a qualified and trained professional can safely design the heights and slopes of a
 landfill facility.

 In the design  and construction of slopes, the natural angles of repose of the materials  used
 should not be  exceeded under any circumstance. On slopes where liner systems or final cover
 systems are to be placed, global  and veneer stability (the ability of the installed materials to
 resist sliding)  should be  considered.   Under typical conditions, soil slopes are  stable at 1
vertical:3 horizontal.  In addition,  slope stability analyses should be performed, as  necessary,
to determine factors of safety.
                                                                                      8-8

-------
 8.3   Types of Landfills
 Under the conditions prevalent in most economically developing countries, landfills may either
 be lined or unlined. They may also be classified by the types of waste they receive.

 8.3.1     Landfills
 Landfills generally  refer to landfills that accept household  or municipal solid waste.   These
 facilities may either be lined or unlined, based on criteria presented elsewhere. A lined landfill
 has a natural or synthetic low-permeability barrier installed at its base. The purpose of the liner
 is to prevent the movement of leachate and gas into the surrounding soil and groundwater.
 With a liner in place, provisions must be made to remove and properly treat or dispose of the
 leachate  that accumulates  above the liner.  The implementation of sophisticated synthetic
 bottom liners, combined with leasihate collection and treatment systems, may be prohibitive for
 a number of developing countries.  For this  reason,  landfills in economically developing
 countries are more likely to be either  unlined, or lined  with natural soils having a low
 permeability,  in order to protect the groundwater resources, the design of landfills  should
 stress good  siting, careful regulation of  wastes accepted at the facility, attention to overall
 landfill  operations,  diversion and/or control of  water from  entering the buried wastes, and
 periodic groundwater monitoring.

 8.3.2    Hazardous Waste Landfills
 Hazardous waste landfills refer to those which are provided with bottom liners and with all of
 the controls necessary to allow receipt of most  types of wastes, including hazardous wastes.
 In developing countries, hazardous waste landfills are most likely to be used for the disposal of
 selected hazardous wastes.

6.3.3     Special Landfills
Special landfills  (e.g., construction and demolition waste/industrial waste landfills) sometimes
are designed and developed for the final disposition of special types of waste or residues,
                                                                                    8-9

-------
 such as construction and demolition debris or some industrial products. Depending upon the
 characteristics of the wastes, these facilities may be lined or unlined. Demolition debris often
 consists of inert materials, and this type of waste typically may be disposed safely in a landfill.
 However, this practice of disposal may represent an unnecessary expense.  Not only do the
 handling characteristics of demolition wastes usually differ from those of household refuse, but
 a large fraction  of the demolition materials are recyclable  and should be monitored and
 processed for materials recovery and, thus, diverted from land disposal.

 8.4    Cell Design and Construction
 Experience has shown that no one method of landfilling is best suited for all sites, and a single
 method is not necessarily the best solution for any given site [3].  The selection of a particular
 method should depend upon the physical  characteristics  of the  site, climatic conditions,
 amount and types of solid waste to be accommodated, and the relative costs of the various
 options.  The two basic types of landfill  methods are the trench (Figure 8-1)  and the area
 (Figure 8-2).  In the trench method, the landfill airspace (or volume) and cover are obtained
 primarily from excavation within the eventual footprint of the waste.  On the other hand, in the
 case of the area method, excavation for landfill volume and cover material within the eventual
 waste footprint is minimal, and cover material is obtained primarily from  outside the waste
 footprint. The choice of trench versus area method is primarily based on topography, geology,
 and depth to groundwater.  Most sites are a combination of trench and area.

 8.4.1     Definition of Cell
All true sanitary landfills consist of basic elements commonly termed  "cells." The cell forms an
enclosed volume, more or less, and is intended to mitigate the more immediate public health
and safety and environmental impact on a regular basis. The more immediate problems are
those associated with vector attraction, odor, potential fires, and aesthetics.
                                                                                  8-10

-------
Original ground
or landfill liner
                      Compacted
                      solid waste
                                                     Earth cover obtained
                                                     by excavation of trench
                      Figure 8-1.  Trench Method of Landfilling
                                                               portable fence to
                                                               catch blowing paper
Original
ground
level
Compacted
solid waste
                       Figure 8-2. Area Method of Landfilling
                                                                                  8-11

-------
 A cell is formed by spreading and compacting the incoming solid waste in layers within a
 confined area.  At the end of each working day, or during the working day as well, the
 compacted.refuse (including the working face) is  covered completely with a thin, continuous
 layer of soil, which is then compacted. The thickness of the soil cover typically is about 15 cm.
 The volume of compacted waste and its daily soil cover comprise a "cell."

 The individual daily cells of refuse are placed in a sequential manner, side-by-side and row-by-
 row,  to fill the area.  A series of adjoining cells at the same height constitute a "lift."  A
 complete area fill may consist of several lifts. The structures of cells and lifts are presented in
 Figures 8-3 and 8-4.
               Figure 8-3. Illustration of Lift and Cell Structure of a Landfill

The cells should be designed and sized for quantities of waste requiring disposal. The basic
elements of a cell are: height, length, width of working face, slope of cell, and sidewalls.

The factors that affect the dimensions of a cell are: the quantity of waste, thickness of daily
cover, stability of slopes, and degree of compaction. As the cell height increases, the relative
quantity of cover material (the soil-to-waste ratio) is reduced. The height of a typical cell varies
between 2  and 4 m.  Thinner lifts than the aforementioned range may have some benefit in
                                                                                   8-12

-------
                    Figure 8-4. Example Illustration of a Canyon Fill

 terms of avoidance or control of fires and in speeding the initiation of the methanogenic phase;
 however, a disadvantage is a higher cover-to-waste ratio.
 Another important parameter is the width of the cell or width of the working face. The width of
 the working face dictates the degree to which the disposal operation can be managed. In most
 economically developing countries,  the working face either is much too wide or there is not a
 clearly delineated working face.  The minimum width of the working face depends upon two
 key factors: 1) the type of equipment used to distribute and compact the waste, and  2) the
 maximum number of vehicles arriving at the peak hour.  Typically, it is recommended that the
 minimum width of the cell be on the order of 2 to 2.5 times  the  width of the blade of the
 equipment used for building the cell.  Suggestions for cell widths as a function of quantity of
waste are given in Table 8-1.
With respect to the  number of vehicles, it is advisable to reach  a  practical and adequate
balance between the width of the cell and  the maximum number  of vehicles arriving  at the
                                                                                 8-13

-------
                      Table 8-1.  Suggested Minimum Cell Widths
                        as a Function of Daily Waste Quantities
       Quantity of Width Wastes (Mg/d)               Minimum Width Cell (m)
                  20 to 50                                      8
                 25 to 130                                    10
                 130 to 250                                    12
                 250 to 500                                    15
 peak hour. The required width of the working face (in meters) can be estimated by multiplying
 the maximum number of vehicles arriving at the peak hour by four.

 The slope of the cell is the inclined plane upon which  the wastes are distributed.   The
              •
 maximum  recommended  slope is 1:4 (verticalihorizontal).    However,  slopes  of lesser
 steepness are preferred, e.g., maximum compaction is achieved when the angle of the working
 face is close to horizontal. Outside slopes of the completed cell, if they represent the finished
 landfill surface, should not exceed 1:3.  Depending upon slope stability and erosion protection
 analyses, outside slopes of  1:4 or even 1:5  may be required to avoid potential  slope failure
 and to minimize long-term maintenance.

 8.4.2     Trench Method
 As the name implies, in this method, a trench is excavated. The  excavation usually is sized to
 receive a specified quantity of waste. Depending on  the local circumstances (e.g., availability
of equipment), the excavation can be sized to receive several days of waste or more, e.g., a
year's volume.  Once the waste is discharged into the trench, the material is compacted and
covered (Figure 8-1). Thus, each trench can be considered a cell.

In the process of disposal, the waste is deposited on  the slope of the trench (maximum slope,
1:4). The excavated material, or spoil, serves as cover material. Spoil  not used for the daily
                                                                                 8-14

-------
cover is stockpiled for later use in a subsequent area fill that might be constructed on top of
the completed trench fill.

Stability of the sidewall is a very important factor in trench designs.  Sidewall stability is a
function of the characteristic strength  of the  soil, depth  of the  trench, distance  between
trenches, and slope of the sidewall. Maximum depth and steepness of sidewall slope are
achievable when the soils are clays, glacial till, or other fine-grained, well-graded, consolidated
soils. Weaker soils require gentler sidewall slopes to preserve stability. Other factors that may
affect soil stability and permissible steepness of sidewall slope are climatic conditions and the
length of time the trench is to remain open.  In  all cases, sidewall slopes  should be designed
so as to avoid imperiling the workers and equipment operating in and near the trench.  As
previously indicated, a suitable distance should be maintained between the bottom of the fill
and the groundwater table.  Consequently, groundwater protection places another constraint
on trench depth.

The width of the trench should be sufficiently wide to accommodate the unloading of wastes
from vehicles and the maneuvering of the  compaction equipment.  The width should be
determined based on  the number and types of vehicles that will use the landfill.  Generally,
practicality dictates  that the width  should  be at least twice  that of the largest  piece of
equipment that is expected to work in the trench.

Depending on  the size of the landfill operation, excavation of the trenches may either be
carried  out on a  continuous basis  at  a rate adjusted to meet landfilling requirements, or
periodically. If periodic excavation is required, it may be possible to contract the operation to
an entity which has specialized equipment.  Greatest efficiency is likely to be achieved if, as
one trench is being filled, another one is being excavated to receive the next day's waste.
                                                                                   8-15

-------
 Alignment of the trenches relative to the prevailing wind direction will influence the amount of
 blowing litter.  The alignment most effective in terms of reducing wind-blown litter is one that is
 perpendicular to the prevailing wind.

 The bottom of the trench should be sloped away from the working face to ensure drainage.
 During wet weather, water that may accumulate at the bottom of the trench should be pumped
 out  Surface water can be diverted from the trench by constructing temporary berms on the
 sides of the excavation.

 8.4.3    Area Method
 The area method involves placing the waste on a surface that has been previously prepared
 for that purpose (Figure 8-2). In this method, a layer of waste is spread and compacted on the
 surface of the ground (on the inclined slope) or, in the case of a lined landfill, on top of the liner
 system (Figure 8-3).  Cover material is then distributed and compacted over the waste.  This
 method can be adapted  for use for land disposal  of waste in quarries, strip mines, ravines,
 valleys, canyons, and other types of land depressions (Figure 8-4).

 8.4.4    Ramp Method
 The ramp, or progressive slope, method  is a variation of the area fill.  It consists of spreading
 and compacting the solid waste  on a slope,  as  illustrated in Figure 8-5.  Cover material
 obtained directly in front of the working face is spread and compacted over the waste. Since,
 in this method, no importation of cover material is needed, the ramp method promotes greater
 efficiency of site usage only when a single lift is built.

 8.4.5     Combination
The area and trench methods can be combined in the construction and operation of a landfill.
For example, if the site has varying depths of workable soil, the trench method could be used
                                                                                  8-16

-------
       Daily earth cover (15 cm
  Original ground
   or landfill liner
                                                               Excavation for earth cover
                           Compacted
                           solid waste
                         Figure 8-5. Ramp Method of Landfilling

where soil depth is greatest Spoil riot used for cover on the trench fill would be reserved for
the sections of the site that are most applicable to the area fill method.

Through the use of the area  method and stockpiled cover material, additional lifts could be
constructed upon a completed lift.

8.5    Landfill Contouring
In the preceding subsections, it was explained that the construction of a landfill can take place
either below ground or above ground.  In addition, the size and shape of the landfill will be site-
dependent. Topographical contouring involves the shaping of a site through controlled filling
and grading.  Determination of the  desired size, shape, slope configuration, and final height of
the landfill is an essential  step in the design. The elevation contours to achieve the required
                                                                                   8-17

-------
 dimensional aspects of the landfill should be established in the form of final grading plans as
 part of the original design.  Since it is generally advantageous to build a landfill in stages, the
 grading  plans should consist of a series of drawings corresponding to the different stages of
 construction.  Needless to say, the contouring of the landfill must reflect the eventual intended
 land use of the fill.  Land use of completed fills is discussed in other chapters of the guidance
 document, including Chapter 17.
 An example of topographical contouring is  landfilling above grade, such that a hill is formed.
 Landfill construction of this type can  have a major impact on any landscape that is otherwise
 relatively flat.  Another example of topographical contouring is filling against the natural slope
 of a hillside in order to extend the hill in an outward direction.  The appearance will be more
 natural if the finished landfill is gently contoured with sweeping lines and smooth transitions to
 existing grade, rather than abrupt changes in slope.  The construction of a hill from compacted
 solid waste is a difficult undertaking.  The design of slopes should be based on analyses of
 slope stability  and professional engineering judgement, not on general rules.

 8.6    Bottom Liners
 Liners are used in modem  landfills  to protect groundwater from contamination by landfill
 leachate.  Based upon the limitations of economic resources and  on  the availability of
 materials of low permeability that exist among a number of economically developing countries,
 the installation of bottom liners may not be feasible.  The  need for the installation of a bottom
 liner depends upon  a  number of  factors.  Two  of the  more  important factors  are the
 hydrogeological  conditions beneath  the  potential landfill site  and local climatic  conditions.
 Bottom liners may be  considered for omission from the design of a landfill if the site is located
 in an arid  or  semi-arid region, where precipitation is 25 cm or less per annum,  and the
evaporation rate is greater  than 50 cm.   If the  above climatic  conditions are met and
engineering calculations show that the potential for generation of leachate is very low, the
                                                                                   8-18

-------
omission of a bottom liner may be justifiable provided that surface water and groundwater
sources are located remotely from the disposal site. An adequate engineering analysis of the
potential impact of an unlined facility on  surface water and groundwater resources would
include the identification and consideration of the maximum design precipitation or inundation
event.

If the conditions warrant the implementation of a bottom liner, the design should be such that
materials used for the liner, as well as the facilities for leachate collection and treatment, be
carefuljy selected and designed since their inclusion  in the facility plan  could represent a
substantial economic hardship.
Bottom liners for landfills include those constructed from earth materials (soil and clay liners)
and those that  are  anthropogenic.  Synthetic  liners  include those constructed solely  of
polymeric  materials  (such as  HOPE)  and geosynthetic  clay  liners  (GCLs),  which are
prefabricated bentonitic blankets.  Anthropogenic, or synthetic, liners  may not be  readily
available or secured,  even if an economically developing country has the economic resources
to construct a lined landfill. On the other hand, it also is to be expected that many locations
will  not have  readily available  sources of day or  other  low-permeability  soils for  liner
construction. The application of liners, therefore,  will be sensitive to both cost considerations
and the availability of materials.
Liner systems may be single, double, or composite.  As its name implies, a single-liner system
consists of only one  impervious or low-permeability component.  The liner may be  either a
natural soil material or a synthetic material.  A leachate collection system is placed above the
liner (Figure 8-6). A double-liner system consists of two liner components, which may be of the
same or different materials. Above the top, or primary, liner is a leachate collection system. A
leak detection system is placed between the primary  and secondary liners (Figure 8-7).  A
                                                                                   8-19

-------
                                         Leachate collection pipes
                                         sloped to drain
                Compacted soil
                      Figure 8-6. Example of a Single-Liner System
                      with Leachate Collection System Also Shown
 composite liner is one that is composed of two dissimilar materials.  Usually, such liners
 employ a synthetic geomembrane liner directly on top of day or other low-permeability soil.

 8.6.1     Soil (Clay) Liners
 Soil liners are used in both single-liner systems and composite-liner systems.  Because of the
 relative availability of soil in general, compared to anthropogenic materials, soil liners would be
 the liner of choice for most applications in economically developing countries. Occasionally,
 soil liners are used  as one component of double-liner systems.  In situations  that require
 secure containment, such as hazardous waste containment, double and composite liners
 should be used.  A  soil  liner may be either the sole liner (single-liner system) or the lower
 component of a composite-liner system. Used as a single liner, a soil liner reduces, and may
 even prevent, leachate from migrating from the fill into the subsurface environment. As the
 lower component of a composite liner, a soil liner constitutes a protective bedding for the
 overlying geomembrane liner and serves as a backup for breaches in the geomembrane.  A
 useful function of all soil liners is to serve as a long-term, structurally stable base  for overlying
facility components.
                                                                                  8-20

-------
                        Granular drainage layer—,
                        Compacted soy
                          —Granular drainage layer
       1— Compacted soU
                                                       —Protective soil cover
                                                      - ;_l_eachate collection and removal
                                                      - - system (above top liner)
                                                       -Top liner (composite)
                                                      ~ LLeachate detection, collection,
                                                      - - and removal system
                                                       -Bottom liner (composite)
    Legend
    •  •  • Geotextile
            (synthetic fibers-woven, nonwoven, or knit)
    ••••• Geonet
            [plastics formed into an open, netlike
            configuration (used here in a redundant manner)]
            Geomembrane
       Figure 8-7. Example of a Double-Liner System with a Leak Detection System

8.6.1.1   Materials
To adequately serve as a liner, a soil must have a low permeability (hydraulic conductivity, k).
The ideal k is equal to or less than 1 x 10~7 cm/sec when compacted under field conditions.
After compaction, the liner should be able to support its own weight as well as that of the
overlying facility components.  The  liner material  should yield  to  handling  by construction
equipment  Finally, a liner constructed of soil material should  suffer no significant loss in
permeability or strength when exposed to waste or leachate from the waste.  A soil that is
                                                                                  8-21

-------
 deficient in a particular characteristic may be rendered suitable by blending it with another soil
 or with a soil additive.  An example is the addition of bentonite to decrease permeability.
 Ideally, the compaction and permeability characteristics of  the  selected soil  liner material
 should be determined by laboratory tests, so as to provide necessary information regarding the
 interrelationship between moisture content,  density, compactive effort, and permeability.  In
 addition,  it is recommended that a test pad be built  in order to verify the results of the
 laboratory analyses, as well as to evaluate  the performance of the liner material under field
 conditions.
 Of the available materials, well-compacted  clay soil is  most commonly used because of its
 properties and general availability. However, some locations do not have sufficient deposits of
 clay, e.g., desert areas and islands of volcanic origin. A day liner usually is constructed as a
 compacted layer, 0.3 to 1 m thick.  To function  as a liner, the clay must be kept moist.  If
 sufficient day is not available locally, natural clay  additives (e.g., montmorillonitej may be
 disked into it to form an effective liner material. The use of additives also requires evaluation
 in a laboratory, as well as controlled field testing to determine  optimum types, amounts, and
 installation procedures.

 If it meets the necessary specifications, use of the native soil at the facility site would be the
 most convenient and cost-effective approach.  Otherwise, a suitable soil must be imported.
 Obviously, cost becomes an  important consideration  when off-site material is used.   In
 economically developing countries, the feasible economic distance would depend upon local
 conditions, such as costs assodated with excavation and transport. In most cases, a haul of
any appredable distance would be impractical.  The soil liner material, whether excavated
locally or imported, usually is stored as a borrow pile established at the site.
                                                                                    8-22

-------
8.6.1.2   Design
Standard geotechnical practices  adjusted to the  local geology  and  landfill operational
requirements should be followed in the design of the landfill liner.  The  soil liner should be
underneath the entire area of the landfill that is covered with solid waste. The liner should also
be sufficiently impermeable in order to impede leachate flow and thick enough to provide a
structurally stable base for overlying components.  The liner should have  a uniform thickness
and its design and placement  should make  allowances  for leachate collection  pipes and
sumps.
Prior to installation of the liner,  the base and sidewalls of the  site  must be prepared.  The
preparation usually consists of excavating and grading. Suggested sidewall slopes for liner
placement are about 1:4 (vertical height:horizontal height). Suggested slopes to the leachate
piping system are 2 to  5%, and 1 to 3% for the pipe.
In general, soil liners are constructed of compacted soils installed in a series of layers (lifts) of
specified  thickness.   Although  the  use  of thinner lifts  facilitates compaction, it adds to
construction costs  because  the number of lifts per  unit of liner thickness  is  increased.
Generally, the thickness of a liner lift prior to compaction is on the order of  15 to 20 cm.  Some
compaction equipment has compaction components (i.e., "feet") of dimension longer than 15
to 20 cm. Thus,  the height of a compactor lift must be consistent with the equipment that is
used to compact the soil.
8.6.1.3   Installation
The liner  is installed by placing the liner material on the bottom of the fill with the  use of
scraper pans or trucks.  The material is spread evenly over the site and then is broken up and
homogenized through the use of disk harrows, rotary tillers, or manual implements to facilitate
compaction.  If soil additives are used, they are applied  evenly over the site and then are
thoroughly mixed  into the soil.
                                                                                   8-23

-------
 The liner may be constructed in sections or in one piece.  For a small facility, the entire liner
 may be constructed in one piece.  Sectional or segmented installation would be more suitable
 for large landfills. In the latter operations, the wastes are placed on completed portions of the
 liner while the following portions of the liner are built. It is important that the sections be
 installed such that no breaks occur between them.  This can be done by beveling  or step-
 cutting the edge of a section as soon as it  is installed,  so that the succeeding section can be
 tied in with the previously installed section (Figure 8-8).
                                Step-cut liner overlap
                  Figure 8-8. Example of a Segmented Liner Installation

 The attainment of a high degree of compaction (and, therefore, of a low permeability) of the
 liner depends upon a proper moisture content of the soil.  Any adjustment of the moisture
 content (e.g., through evaporation or through addition of moisture) should be made prior to
 placement of the liner.  Care should be taken to achieve a uniform distribution of moisture
 throughout the soil.  Uniformity of moisture  distribution  is achieved through mixing and by
 allowing  adequate equilibration time after the moisture addition.  The  required time may be
 days or even weeks if the soil is very dry or certain additives are used.  If the soil is too wet, it
 should be spread in layers, without  compaction, until sufficiently dry and then mixed and
 placed and compacted on the liner. Moisture control is critical to the successful performance
of a liner.  If the soil is too wet (muddy) it cannot be worked, and if it is too dry, it cannot be
compacted sufficiently.
                                                                                   8-24

-------
The use of on-site days for a liner generally will require recompaction and moisture adjustment
of the soil in order to achieve a satisfactory liner.  Recompaction generally is needed also to
ensure  that there  are  no  lenses, cracks, and fractures which would  compromise  the
performance of the liner system.

Practices followed and equipment used in earthwork construction generally are suitable for
compacting a liner. Heavy compaction equipment fitted with sheep's foot rollers are ideal.  The
success of the compaction effort depends upon the individual soil  liner layers being properly
joined together.  Joining the  layers can  be accomplished by scarifying the surface of the last
installed lift prior to adding the next one and ensuring that the moisture content of adjacent lifts
is similar.  If sidewall slopes are not very  steep,  they can be  compacted in lifts which are
continuous with the layers for the bottom  liner.  Steeply sloped  sidewalls may have to be
compacted in horizontal lifts because compaction equipment cannot operate on steep slopes.
Joining is especially important for steep  sidewalls, because separation between lifts can serve
as pathways for the migration of leachate through the liner. In general, horizontal lifts on steep
side slopes should  be avoided, and the side slopes should not  exceed 1:4 unless special
measures for steep slopes have been fully considered in the design.
Because climatic conditions strongly  influence activities related to soil liner construction, steps
must be taken to  minimize impacts  associated with  climatic conditions.   For  example,
precipitation may interfere with construction operations by eroding or flooding the  site or by
over-moistening the liner material. A preventive step would be to seal-roll the compacted layer
so that the water will drain and not puddle or pond on the liner surface. Conversely, drying of
the liner material can lead to  the formation of cracks and, thereby, seriously increase the
permeability of the liner.  Cracks due to excessive drying can  be  remedied only by disking,
adjusting the moisture content, and recompacting the affected portion of the liner. Liners must
not be constructed  by  using  frozen  soils and  must  be protected  from below-freezing
temperatures.
                                                                                   8-25

-------
 With regard to the proper placement of soil-type bottom liners  in economically developing
 countries, the availability and commonly used types of heavy construction equipment must be
 borne in mind.  Tracked dozers (i.e., track-type tractors) are the  dominant heavy equipment
 available in economically developing countries for performing the  function of compacting soil.
 Generally, due to reasons of cost containment, of competition for funds, or of having to borrow
 equipment from other departments, the dozers tend to be the smaller models (i.e., those of
 lesser production capacity and lighter gross weights).  Unfortunately,  tracked dozers are not
 the  ideal equipment for compacting clay soils for  the  purpose of achieving a hydraulic
 conductivity of  10'7 cm/s or less.  Field studies [4] have shown that the achievement of this
 level of permeability for clay soils requires a grain size of 50% (by weight) cumulative passing
 200 mesh and a clay content greater than 25%.  On the other hand, tracked dozers are best
 suited for the compaction of coarse-grained soils with less than 4 to 8% passing 200 mesh.
 Consequently, for the successful placement of a bottom liner, the designers and installers of
 bottom liners must be cognizant of the need for the proper type of heavy equipment, as well as
 the availability of suitable soils.

 8.6.2    Geomembrane Liners
 The constituent material of a geomembrane liner  is  prefabricated polymeric sheeting.  The
 terms "liner" and "geomembrane" are sometimes used interchangeably. Another, and lesser
 used, name for geomembrane is flexible membrane liner (FML).

A geomembrane liner may be used in several ways. For example, it may be used as a single
liner installed directly over the foundation (soil) of the landfill, or it  may be part of a composite
liner placed upon a soil liner. Finally, it may be placed above or below a leak detection system
in a double-lined landfill.
                                                                                 8-26

-------
The design of a liner system that utilizes a geomembrane has many of the general features of
a soil-liner system, namely an impermeable base, a collection and drainage system, and a
piping system for transport of the collected leachate.
Geomembranes may not be available in economically developing countries. Should they be
available, attention must be given to cost, as well as to the practicality of their installation.
The major steps to be taken in the use of a geomembrane liner  are: 1) selection  of the
material, 2) design of the subgrade, and 3) planning of the installation.  Planning involves the
design of subcomponents, such as sealing  and anchoring systems  and vents.  Among the
types  of membranes commonly  used  for  lining  landfills  are  high-density polyethylene,
chlorinated polyethylene, and chlorosulfonated polyethylene [5,6].  Important criteria to follow
in selecting a geomembrane include:
•     chemical compatibility with the leachate to be contained;
•     possession of appropriate physical properties such as thickness, flexibility, strength,
       and degree of elongation;
•     long-term stability; and
•     availability and cost.
One of the more important criteria in the selection of a geomembrane liner for a community in
an economically developing country would be that of availability and  cost.  Another important
criterion closely related to cost is availability  of equipment and properly trained personnel for
the adequate installation of the synthetic liner.

In the  absence of testing facilities, judgements  related  to chemical compatibility should be
made  on the basis of specifications  listed  by the manufacturer.   Regarding mechanical
properties, geomembrane liners having high strength and  low elongation are best suited where
                                                                                  8-27

-------
 high stresses are expected (e.g., sidewalls steeper than 1:3).  Lower strength and higher
 elongation geomembranes  (e.g.,  high-density  polyethylene,  chlorosulfonated polyethylene,
 rubbers) are most appropriate for applications  likely to involve large deformations, such as
 differential settlement and local subsidence. Other physical properties to be considered are:
 •     resistance to puncture,
 •     thermal expansion,
 •     characteristics for making joints or seams,
 •     resistance to weathering, and
 •     resistance to biological attack.
 Weathering may  take the form of deterioration by ultraviolet light,  ozone  reactions,  and
 plasticizer migration.  Agents of biological attack include bacteria, fungi,  and rodents.  In this
 particular case, it is necessary to rely on data  provided by the manufacturer and advice by
 trained professionals.  Although  some  published  literature  is available,  such information
 typically is very difficult to obtain in an economically developing country.

 The subgrade upon which a geomembrane liner rests is a key factor in the maintenance of its
 integrity.  The subgrade  should serve as a supporting structure  and should  prevent  the
 accumulation of gas and liquid beneath the liner.  Surface preparation should include removal
 of stones (larger than 2.5 cm), roots, and other debris from the  surface.  Organic material
 should be removed in order to reduce settlement and gas production from the decomposing
 organic matter under the liner.  Soils that expand  or shrink  excessively should be avoided
 because of the repeated stresses imposed on the liner  by the shrinking and swelling. Finally,
the substrate soil surface should be compacted to provide a firm and unyielding  base for the
liner.
                                                                                   8-28

-------
Gas can be produced below the liner by microbes in the underlying soil. It could result from air
entrapped during liner installation  or that which  is being forced through the soil by a rising
groundwater table.  Regardless of its origin, the gas could lift up the membrane, thus imposing
a stress on it  Liquid may accumulate as a consequence of leaks in the liner or infiltration of
groundwater from surrounding soils.  Consequences of the accumulation can be uplift stress
and reduction  of the strength of underlying soils.  Leachate that escapes from the landfill
through breaks in the membrane can contaminate surrounding soils.

In addition to mechanical stresses resulting from gas and liquid accumulation, such stresses
may be caused by subsidence beneath the liner.  Other mechanical stresses may take the
form of: 1) tangential stresses due to differential movements of the subgrade, 2) concentrated
stresses that lead to punctures and tears, and 3) repeated stresses that fatigue or abrade the
liner. All of these failure mechanisms can be prevented or minimized by:

•     taking general foundation design measures to prevent settlement, subsidence,  slope
       failure, and other undesirable occurrences;

•     determining foundation configuration;

•     appropriately designing protective bedding layers; and

•     specifying proper surface preparation measures.

Among the foundation design measures that can be adopted are configuration of the subgrade
to be free of abrupt changes in grade (i.e., to be on a smooth plane or as regular as possible).
Sidewall slopes should be such that tangential stresses do not  exceed the tensile strength of
tiie liner.  Important design features of protective bedding layers are the provision of drainage
to prevent the accumulation of gas  or liquid  and the  protection  of the  liner from  being
punctured.  The drainage layer may consist of  sand, gravel,  or other comparable granular
                                                                                  8-29

-------
 material.  Alternatively, it may take the form of a geotextile (a fabric designed to provide tensile
 strength and serve as a filter).
 Some of the problems associated with granular drainage layers are:

 •     difficult installation on slopes,

 •     instability on steep slopes, and
 •     vulnerability to disturbance by workers during construction.
 These problems are avoided by resorting to geotextiles. Moreover, geotextiles protect the liner
 from mechanical stresses.  However, geotextiles in contact with liners may present another set
 of difficulties, especially with respect to slippage on steeper slopes.  The need for a drainage
 layer below the liner may be avoided altogether if there is  adequate vertical separation
 between liner and groundwater, and if perimeter drainage controls are effective.
 As the discussion presented in the preceding paragraphs indicates, the design of any landfill-
 liner system is a complex and critical task, and the variables are many.  Liner system design
 should be performed by qualified and competent engineers only. Similarly, the installation of a
                                         *
 geomembrane liner is a complex and critical undertaking,  and should be done by a qualified
 and competent company under the supervision of the manufacturer or an installer designated
 by the manufacturer, with third-party oversight by a trained engineer.

 8.7    Final Covers
With regard to the landfilled wastes, the final cover is  the only method  to limit leachate
generation  and,  hence, potential contamination  of groundwater  for sites not  located  in
groundwater.  The final cover serves to  limit  the  inflow of water into the  fill from  outside
ambient sources, e.g., precipitation.  A good final cover system also serves to reduce the time
                                                                                   8-30

-------
and expense of long-term care and to reduce long-term adverse environmental impacts, while
at the same time promoting productive use of the closed landfill and its surroundings.

Final covers for landfills (also called landfill caps) serve several purposes; namely, they:

•      provide a physical barrier over the buried  refuse, thus preventing  human contact,
       minimizing problems with vectors (disease carriers), and serving to control odors;
»      prevent erosion that could expose the waste materials;
•      reduce the amount of infiltration that contributes to the generation of leachate; and
•      provide for a good foundation for possible reuse of the landfill area.
                            * ^-
Final cover systems in some industrialized countries are  designed  with  multiple layers and
range from the simple to the complex.  In a developing country, the simpler designs are more
likely to be affordable (one reason is the general scarcity and expense of securing appropriate
cover soil), but may not offer entirely satisfactory performance. Where compromises in design
and construction are made, the likely tradeoff will be greater maintenance requirements during
the post-closure period.

The most  basic design of a final cover contains two layers: 1) the surface (or vegetative
support) layer, and  2) the hydraulic barrier layer (Figure 8-9). The surface, or vegetation, layer
supports a cover crop of hardy, perennial grasses that promote evapotranspiration and help to
control erosion by  wind and water.  Below the surface layer is  the hydraulic barrier layer,
consisting  of a soil of low permeability, which impedes  the infiltration of  any water from the
surface layer that was not lost to runoff or to evapotranspiration, and also holds water for later
evapotranspiration.
                                                                                   8-31

-------

MX MX MX MX MX MX MX

-^~
-^-

	 Vegetative support
layer
Hydraulic barrier
layer
	 Solid waste
                          Figure 8-9. Basic Final Cover Design

 In an economically developing country, it is advisable to use a thickness of about 60 cm for the
 surface layer and 30 cm for the hydraulic barrier.  This design would be acceptable in areas
 with high evaporation and low rainfall (i.e., arid and semi-arid regions).
 In other climates, and where situations demand additional protection, it may be necessary to
 include thicker layers or other layers in the final cover system design.  For example, in humid
 climates, the basic  2-layer design may be incapable  of controlling the quantity  of water
 infiltration without causing saturation and sloughing of the overlying soil layer.

As described above, the three routes for reducing infiltration into the landfill are:

 1.     promotion and facilitation of runoff,

2.     enhancement of evapotranspiration, and

3.     reducing the passage of water through the barrier layer.
                                                                                   8-32

-------
In order to promote runoff, the finished surface of the landfill should have a recommended
minimum slope of 5%.  A slope of this magnitude will provide good drainage, while allowing for
differential settlement of the landfill over time. Establishment of a vigorous cover crop will help
to  prevent  erosion,  while  removing a  large  fraction  of  the  water  budget through
evapotranspiration. The hydraulic barrier layer will be most effective if it is comprised of a very
low-permeability material - the lower the hydraulic conductivity the better, with the best being
10~7 cm/sec or less.
A substantial buildup of moisture above the barrier layer, as already mentioned,  could lead to
problems in the performance of the final coyer system. The addition of a drainage layer above
the  barrier  layer  would contribute to the  solution  of  this problem.   The drainage layer
represents an increase in the complexity of the landfill cap, but is just one example of the more
elaborate designs that are possible in multi-layer landfill cover systems. As shown in Figure 8-
10, there are eight different layers that can be considered  in the design of a final cover.  The
layers are as follows:
1.     surface (vegetative support) layer,
2.     filter layer (upper),
3.     biotic barrier,
4.     drainage layer,
5.     hydraulic barrier,
6.     foundation layer (buffer),
7.     filter layer (lower), and
                      x
8.     gas ventilation layer.
The function and essential criteria for each layer are summarized below.
                                                                                   8-33

-------
                    M/
M/
                            Surface (vegetative support)
                                     Fillter(s)
                                   Biotic barrier
                                     Drainage
                                 Hydraulic barrier
                                Foundation (buffer)
                                     Filter(s)
                                   Gas control
                                      Waste
              Figure 8-10. Components of a Complex Final Cover System

8.7.1     Surface (Vegetation) Layer
The surface layer is needed to protect the cover from erosion due to wind and water flow. It
also serves to reduce infiltration through evapotranspiration.  This layer should be about 60
cm, composed of nutritive and dense topsoil in order to support plant growth, and be sloped to
prevent water accumulation. This material can be mixed with composted yard debris, sludge,
or animal manures.
                                                                                8-34

-------
8.7.2      Filter Layer
Any time that fine soils are placed above coarse soils, there is potential for the migration of the
fine soils into the voids of the layer of coarse grains.  This phenomenon results in the plugging
of the coarse layer.  Filter layers are used to remove fine particles from infiltration and to allow
upward flow of landfill gases. A graduated soil layer of finer to coarser particles (top to bottom)
may be used as the filter layer. Granular filter sand can also be used as the filtering media.
Synthetic filter fabrics (geotextiles) can also serve this function if they are available locally.

8.7.3     Biotic Barrier
The integrity of the hydraulic barrier must be maintained throughout its design life. Plants and
animals can perforate the hydraulic barrier and, thus,  ruin its performance.  One  method of
controlling this potential problem is through frequent  mowing and pruning of the plant growth.
Rodenticide can be used, but sparingly,  since  it may contaminate surface or groundwater.
Another method of control is through the installation of a biotic barrier. A biotic barrier consists
of a layer of construction debris or  crushed rock, of a size that will prevent the advance of
plants and animals into the underlying layers.  Biotic layers can range from 30  to 90 cm,
depending on site-specific conditions.

8.7.4      Drainage Layer
The design of final covers should, in most cases, incorporate the design of a drainage layer.
The few exceptions would be in arid areas, where precipitation is very low.  The only purpose
of this layer is  to intercept the downward flow of infiltration and to redirect it laterally (to the
landfill perimeter) before it can penetrate the hydraulic barrier.

A schematic of a drainage layer system is presented in Figure 8-11. As shown  in the figure,
the layer must slope in the direction of collection points on the perimeter of the landfill.  The
layer should be composed of porous material, having a hydraulic conductivity of 10~2 cm/sec or
                                                                                    8-35

-------
                      Drainage layers
                                                             Toe drain
                                         Low-permeability soil
                                         (hydraulic barrier)
     Waste
       Figure 8-11. Illustration of a Drainage Layer Sloping to the Collection System

 greater, and the thickness of the layer should be,at least 30 cm. Appropriate materials include
 medium-to-coarse sands, gravel, and synthetic drainage media (geonets).

 8.7.5     Hydraulic Barrier
 The hydraulic barrier is probably the most important layer of a final cover system. The main
 function of the hydraulic barrier is to prevent infiltration of precipitation into the solid waste.  In
 industrialized countries, these barriers are made up of geomembrane liners, or of fine-grained,
 low-permeability soil, carefully compacted.  In economically developing countries, soil barrier
 layers  should be the first choice as hydraulic barriers.  The thickness of the layer depends on
site conditions, but should be at least 30 cm, with the goal being 60 cm.  The soil can be
admixed with other materials such as bentonite clay and fly ash in order to achieve  as low a
permeability as is feasible, with the goal being the achievement of a permeability of less than
                                                                                   8-36

-------
or equal to 10"T cm/sec. The success of the final cover depends upon the maintenance of the
hydraulic barrier's integrity.

The integrity of the hydraulic barrier layer can be adversely affected by three mechanisms of
degradation: chemical, mechanical, and environmental.  Of the three mechanisms, chemical
degradation occurs as a result of reactions between vapors and gases and the barrier material,
and is the least troublesome.  Mechanical degradation results mainly from construction-related
factors such as excessive overburden, high compaction, the presence of  clods, improper
moisture content at the time of compaction, and punctures by coarse materials. Environmental
degradation is caused by drying, wetting, freezing, thawing, and root penetration.  Even where
available, the use  of synthetic membranes in liner construction can be relatively expensive in
some economically developing  -countries.  If synthetic membranes are used, they must be
property protected from mechanical  damage (during  both  construction  and  post-closure
maintenance) by installing them with an adequate underiayment and an overlaying protective
layer such as sand, which may also serve as the drainage layer.

8.7.6    Foundation Layer (Buffer)
The foundation layer is designed to serve as a protective buffer between the barrier layer and
the landfilled waste, and to support the load from the cover.  It is installed directly under the
barrier layer. This layer usually .is made up of compacted medium-to-coarse grained soil. A
geotextile may also be used for this purpose.
Installation of a foundation layer is not the only consideration in foundation design for landfill
cover systems.  Since one of the main  concerns  is  the control and accommodation of
settlement of the cover system  due to decomposition of the underlying wastes, a particularly
effective means of protecting the capping system is to provide a well-designed and property
constructed subgrade.  The longevity of the cap components will be enhanced if the subgrade
is graded smoothly and is property compacted before the final cover materials are placed.
                                                                                 8-37

-------
 8.7.7     Gas Ventilation Layer
 Landfill  gas (biogas) is  a product of decomposition  of organic matter in  the  landfill  (see
 Subsection 8.13 and Chapters 11 and 14).  The final cover system must provide  a means for
 releasing the gases generated  after the cap has been placed.  The gas ventilation layer
 provides the mechanism and pathway for  gas release.  Gas  venting mechanisms typically
 utilize a porous layer of at least 30 cm, placed as close to the waste as possible.  The layer
 may be part of a static or dynamic gas collection system (see Chapter 14).  An effective means
 of gas ventilation is to install the porous layer directly above the waste and below the hydraulic
 barrier layer. It would probably be most economical to combine the functions of the ventilation
 and foundation layers into one layer.  A typical design would include a 15 to 30 cm layer of
 highly permeable soil (k greater than 10'2 cm/sec,  similar to that of  a drainage layer) or the
 equivalent permeability using geotextiles.

 8.8   Use of Earth Materials
 An efficient and economical landfill operation is one that makes productive use of on-site and
 locally available earth materials, to the maximum practical extent.  Using local materials will
 reduce the costs of material hauling, construction, and  operation of the landfill. A list of some
 possible uses of different earth materials that may be readily available to a particular landfill
 project is presented in Table 8-2.

 8.9    Construction Quality Assurance
 This section presents a series of recommendations to follow in order to achieve a proper and
 reliable design  of a landfill.  It is recognized that  in some  locations, it may very difficult to
 comply with all of the recommendations. However,  it is also recognized that there are several
 areas within economically developing countries which have reached a very sophisticated level
 of landfill design and operation.  Furthermore,  the recommendations are presented so that
those communities  which, due to present  circumstances,  are  not  able to comply with the
                                                                                  8-38

-------
                      Table 8-2. Typical Uses of Earth Materials for
                          Landfill Construction and Operation
Material
Clay, Silty Clay (k=10'7 cm/sec after compaction)
Dense Till (k=10"' cm/sec after compaction) (no
stones larger than 10 cm)
Silt, Silty Sand, Fine Sand
Medium-to-Coarse Sand
Gravel
Stones (crushed rock up to 4 cm in size)
Stones (rock fragments from 4 to 40 cm in size)
Stones (rock fragments larger than 40 cm)
Common Borrow (no stones larger than 15 cm)
Topsoil
Uses
Bottom liners, barrier layers
Bottom liners, barrier layers
General site filling and grading, daily and
intermediate cover
Drainage, gas ventilation, and buffer layers;
general site filling and grading; pipe bedding
Drainage and gas ventilation layers; road and
embankment fills; pipe bedding; subdrain
trenches
Leachate collection drains; subdrains; gas
collection vents, trenches, and wells; road
bases and surfaces (angular rock only)
Rip-rap for channel protection and slope
stabilization
Rip-rap for protection and stabilization of
major slopes and drainage ways
General site filling and grading
Surface (vegetation) layers
suggestions are aware of the intricacies associated with a sound program for construction
quality assurance.
The design engineer is responsible for ensuring that  the materials specified for the landfill
construction have the proper size, quality, durability, and performance characteristics for the
intended function.  The responsibility of the installer (e.g.,  municipal  crew or construction
                                                                                   8-39

-------
 contractor) is to obtain the specified materials and to install them in  accordance with the
 engineer's drawings  and  specifications.   Finally, it  is  the  responsibility of  the  owner's
 supervising agent (usually the engineer)  to  make certain that  the installer documents the
 specifications of the materials and performs the required field tests of the installed components
                                                                  I
 as set forth in the engineer's construction specifications.

 Modem sanitary landfill  practice entails  the  presentation of  laboratory test reports or
 manufacturer's  written certifications  to show that the more  important landfill  construction
 materials meet the physical properties stated in the specifications.  Some of the important
 construction materials include earth materials and manufactured products. The owner, or the
 owner's agent, should receive these certifications and reports for approval before the materials
 are installed, and preferably before they are delivered  to  the jobsite,  or are  excavated if
 obtained on-site.

 Laboratory test reports or certificates,  as relevant, should be  presented for the following
 construction materials:

 •      low-permeability soils for liners or barrier layers;

 •      soils for drainage, gas ventilation, or buffer layers;

 •      any other soils having a specified permeability or gradation requirement;

 •      stone for leachate collectors; subdrains; gas vents, trenches, or wells;

 •      topsoil for final cover systems;

•      geotextiles for any specified application;

•      geomembrane liners; and

•      any other specified  geosynthetic material.
                                                                                     8-40

-------
Typical laboratory tests on proposed soil materials include natural moisture content, particle
size distribution, Atterburg limits,  and Modified Proctor compaction.  Hydraulic conductivity
testing is performed on low-permeability soils, as well as drainage and gas ventilation media.
As stated previously, special attention must be paid to the moisture content and to the proper
compaction of clays during preparation and installation of clays as hydraulic barrier layers.
 In the  United States, it is common to require testing of samples taken from the borrow pit
 before delivery, then subsequent testing of the delivered material at a specified sampling
frequency.   It is  recommended that installed earth materials be  field  tested for in-place
compacted dry density and moisture content after each completed lift.  Structural fill for landfill
foundations, earth berms, and others should be compacted to a relative density of 90%.  Non-
structural fill and soil layers within final  cover systems may be compacted to 75% relative
density.

Manufactured products for which certificates are normally required In industrialized countries
include: all  pipe  and  fittings,  geomembrane  liners, geotextiles,  and  other geosynthetic
materials.  In addition, the specifications should require the contractor to submit shop drawings
for any special fabrications.  In the  example of a  geomembrane  liner to be installed, the
contractor's submittals would typically include the following:

•      manufacturer's certification of compliance to specified physical properties;

•      laboratory test results  demonstrating  conformance to  selected physical  property
       requirements;

•      manufacturer's warranty;

•      manufacturer's recommended installation and repair procedures;

•      contractor's workplan and detailed sequence of installation;
                                                                                   8-41

-------
 •     shop drawings showing proposed layout of geomembrane panels and location of field
       seams; and
 •     manufacturer's non-destructive and destructive seam testing procedures to be used in
       the field, and the criteria for accepting or rejecting tested seams.
 During the  installation,  the contractor should be required to maintain a quality control log to
 document the progress of the work, including the location and results of all  field tests.
 Laboratory  test results on  any samples taken  for destructive  field seam  tests should be
 submitted to the owner  as soon as they are available.  Upon completion of the installation, the
 contractor should  submit bound copies of all certificates, test results, logs, and field notes to
 the owner.  Record ("as-built") drawings of the completed installation should also be included in
 the documentation.

 8.10  Groundwater Controls
 As discussed in Subsections 8.2 and 8.6, in the event that conditions are such that an unlined
 landfill can be implemented, it is important to provide a vertical separation between the bottom
 of the landfill and the  underlying aquifer (e.g.,  3 m).   The requirement for separation also
 pertains to situations wherein the aquifer has been artificially lowered and the sidewalls of the
 landfill are  potentially subject to groundwater intrusion.  In  the case of lined landfills, the
 separation is less critical; but it is still good practice to provide at least some  nominal distance
 between the liner and the highest known water table elevation.

To achieve  an adequate separation between the water table and the landfill, in some  cases
lowering of the water level by pumping or lateral diversion of the water may be possible. When
positioned within an aquifer, the fill is subject to an inward pressure gradient effected by the
water.  If the source and flow of the water is artificially modified, an adequate separation can
be achieved between the fill and the water.
                                                                                   8-42

-------
Lowering of the groundwater table, coupled with the excavation of the soil, can also be used in
some cases to generate cover soil and landfill capacity. However, it is generally impractical in
an economically developing country to lower the water table by pumping because of the
required effort and expense of operation and maintenance. Consequently, in most cases, any
groundwater table modification would have to be performed by means of gravity drainage.
the ability to collect and  drain groundwater  will depend on the transmissivity  of the
groundwater through the soil, which  is a function  of available  hydraulic pressure and the
permeability of the soil. Attempts to modify the groundwater table will be possible only where
the soils are  reasonably  permeable and  there is sufficient  topographic relief to allow free
drainage of collected groundwater to a surface outlet at some lower elevation.

The usual method employed for diverting groundwater is to install an interceptor trench(es) on
the upgradient side(s) of the landfill.   This concept is illustrated in Figure  8-12.  The high
permeability material for the interceptor can be  locally available aggregate or alternatives such
as coarsely crushed glass from resource recovery operations if conventional aggregate is not
locally available.  The design of the groundwater control system must be carefully considered,
as it must perform reliably and virtually without maintenance for the duration of landfilling and
the subsequent post-closure period.

8.11   Surface Water Management
Surface water management consists generally of:

•      preventing run-on (from upland areas) from flowing onto the landfill site and contacting
       the waste fill,

•      controlling runoff so that it is diverted from the active landfill area and does not create
       pools or saturated soil conditions on the landfill and peripheral areas, and
                                                                                  8-43

-------
                                        Trench filled with crushed
                                        stone or equivalent drainage
                                        media
                                                       Geotextile with large
                                                       apparent opening size
                                                               Natural groundwater
                                                               flow direction
              Water table
                           Perforated pipe  •
                           (to surface outlet)'
                      Figure 8-12.  Groundwater Interceptor Trench



 •     providing erosion and sedimentation control measures to prevent sediment deposition

       in drainage ways and low-lying areas on the site and to protect downstream water

       resources.


 The significance and methods of surface water management have been previously mentioned

 in this chapter, as well as in Chapter 7.


 8.12  Leachate Management


 The purpose of leachate management is to prevent contaminants in the leachate from entering

 the underlying aquifer and any connected surface water body.  The three tenets of leachate

 management are minimization, prevention, and containment.


 8.12.1    Minimization

The first rule is to minimize the quantity of leachate  generated by considering the manner in

which the landfill design and operation influence leachate formation.  As previously indicated,
                                                                                  8-44

-------
infiltration of precipitation  and surface water is  the  major pathway for the generation of
leachate.  Therefore, steps should be taken in the design and operation of the facility to
minimize infiltration.  This goal is achieved by:
•      keeping the active area of the landfill as small as practical;
•      segregating the active landfill  from unfilled (future)  stages by means of berms and
       separate leachate collection systems;
•      placing low-permeability soil cover on inactive areas, and final cover on  areas that have
       reached final grades (in other words, providing for sequential closure of the landfill in
       planned stages); and
•      ensuring that the final cover system design incorporates an effective hydraulic barrier
       layer, as discussed previously.

8.12.2   Prevention
Ideally, the landfill should be constructed entirely above the water table. The fulfillment of this
condition will prevent the  formation of leachate through contact  between  the waste and
groundwater. Although to be avoided if possible, where a landfill is located within groundwater
and therefore subject to an  inward hydraulic pressure gradient, contact between the waste and
the water is to prevented by proper design of the liner system.

8.12.3   Containment
Containment of leachate is  possible only in lined landfills or in those landfills built in a naturally
occurring day or dense till subgrade soil.  The contained  leachate must  be collected in a
leachate collection system above the landfill liner, then removed for subsequent treatment or
disposal.  Removal of leachate from the system usually is  accomplished by pumping.  The
alternative to the collection  and treatment of the leachate that is produced is  a steadily rising
                                                                                  8-45

-------
 level of leachate within the fill, which has led to substantial problems and costs at disposal
 sites in the past.  The costs of containing, collecting, removing, and treating leachate are
 relatively high.  Where collection or containment  is not feasible, the strategy for leachate
 management must be effective application of the concepts of prevention and minimization.
 Detailed  discussions on  leachate generation and the  systems for collecting  and treating
 leachate are presented in Chapters 12 and 13.

 8.13   Landfill Gas Management
 The management of landfill gas includes:
 •      prevention of gas migration to off-site properties or landfill structures,
 •      passive venting of gas through the landfill cover system, and/or
 •      extraction of landfill gas for the purpose of emissions control or energy recovery.
 Prevention of gas migration is achieved by providing zones of high permeability within the
 landfill  into which the gas  will flow preferentially.  This commonly is done by installing a
 permeable gas ventilation layer and collection system in capped areas of  the landfill (see
 Subsection 8.7).   The ventilation layer exhausts into vertical gas vents  (Figure 8-13), which
 penetrate the final cover system to release the gas into the atmosphere.  Typical spacing for
 surface vents is one per 4,000 m2, assuming  good movement  of gas and high permeability
 layers, or one per 1,000 m2 if gas movement to the collection points is slow.

 Inexpensive gas venting systems in use in some economically developing countries include the
 use of columns of rocks as the porous media,  constrained to a columnar shape by using stiff
wire mesh or 200-liter drums with the ends cut out.  The wire mesh or drum columns  are
extended vertically as the height of the fill rises.
                                                                                   8-46

-------
                                               Gas vent
                                                                Top layer
   Geomembrane   ||||||||||||il»li»ll	 i'  ',  ''  ' i       ^'illUlllllllll     Drain layer
                                                               • Low-permeability
                                                                geomembrane/soil layer
   Perforated pipe-^/    /   /   /   /   /   A>T^ Vent layer
                                                                Waste
                   Figure 8-13. Ventilation Layer and Vertical Gas Vent

 Occasionally, passive control measures may not be sufficient to stop all lateral migration of
 gas.  In such cases, additional perimeter controls  may be installed; for example,  permeable
 layers under the cover or within the fill to facilitate lateral movement and venting of gas or high
 permeability gravel-filled  trenches with an  outer  low  permeability barrier wall located just
 outside the waste  boundary and extending from  ground surface to below the level of the
 landfill base. In extreme cases, active ventilation systems may be necessary.

 Active gas extraction systems for the purposes of emissions control or energy recovery are
 likely to be feasible only at large urban landfills. The topic of gas extraction and utilization is
 considered at length in Chapter 14.
                                                                                       \
 8.14   Provisions for Materials Recovery
 Recovery (i.e., salvaging) of materials from mixed  solid wastes delivered to land disposal
facilities  is practiced and generally  accepted  at many land disposal sites  in economically
developing  countries.   The salvaging  operations can  involve a high  or  low  number  of
                                                                                   8-47

-------
 scavengers, depending on local conditions. Regardless of the number, scavengers, if present
 at all, represent an aspect of the waste disposal process that must be managed and controlled
 if they are to be allowed to ply their trade at the disposal site.  The importance of scavengers
 with  respect to the design and operation of disposal sites is sufficient to warrant separate
 treatment of the subject in Chapter 15.

 8.15  Land Disposal of Hazardous Waste (Hazardous Waste Landfill)

 8.15.1   General
 A variety of hazardous wastes  also are generated in economically developing  countries,
 regardless of degree of  development,  and require disposal in  a safe  and environmentally
 acceptable manner. In many economically developing countries and in some industrialized
 countries, legal definitions,  standards,  safeguards, practices,  or  enforcement procedures
 pertaining to the protection of the public health  and of the environment are inadequate. One
 result of this circumstance is that solid and hazardous wastes often are mixed and delivered in
 combined form to land disposal sites.
 However, in those cases where the collection of hazardous wastes is separate from that of
 municipal solid wastes, the  disposal  of the hazardous wastes in  dedicated containment
 facilities (i.e.,  hazardous  waste landfills) offers an  added measure of  protection  to human
 health and safety and to the environment in  comparison to their disposal in a facility with a
 lower degree of management and containment, e.g., a solid waste landfill.

 Since the characteristics of hazardous wastes which make  them  dangerous are universal, the
 measures required for the disposal of hazardous wastes in economically developing countries
 should not differ materially from  those  imposed in industrialized countries. While the main
focus of the guidance document is  municipal solid waste, the  fact that, in some locations,
hazardous wastes can comprise a substantial portion of some mixed solid wastes streams is a
                                                                                 8-48

-------
strong reason to dedicate a portion of the document to acceptable methods of their disposal
on land.

8.15.2   Definition and Basic Criteria
A hazardous waste landfill is a complex, engineered system specially designed to contain
hazardous wastes such that they cannot escape into the environment. Therefore, this type of
landfill must meet the following important criteria:
1.     Waste disposed in the landfill must be completely contained  by a naturally occurring
       low-permeability soil layer (e.g., clay) or an installed liner of impervious material.
2.     The distance between the bottom of the liner and the groundwater shall be sufficient to
       prevent contact between the two under all conditions.
3.     Leachate and all other liquids must not be allowed to accumulate inside or outside of
       the containment.
4.     The containment system must include a system to detect leaks in the containment.
5.     Groundwater must be monitored in such a way that any leakage from the landfill can be
       detected.
6.     The landfill  is located such that it is isolated from  surface and subsurface water
       supplies; will be free from flooding, earthquake, or other  natural disturbances; and its
       site will not be needed for other uses after the facility is closed.

8.15.3    Hazardous Waste Landfill Design
Any  landfill that will  contain significant concentrations  of hazardous wastes and that will
represent a threat to the quality of surface water or groundwater  should be constructed with a
composite or double-liner system (see Subsection 8.6).  As with all landfills, the design will
                                                                                  8-49

-------
 depend in large part on the hydrogeological characteristics of the site.  In an ideal setting,
 there will be adequate distance to the water table, and the underlying soils will have very low
 permeability.  If the natural  soils  have a hydraulic conductivity of 10*7 cm/sec or less after
 compaction, they may serve as the lower component of a composite liner.  If conditions are not
 ideal but do meet minimum siting criteria, a composite- or double-liner system can be installed
 following suitable preparation of the site.
 A leachate collection system must be installed directly above the liner.  Provisions must be
 made for withdrawing the leachate as it accumulates, and for properly treating or disposing of
 this liquid.

 The design of the hazardous waste landfill should provide for the segregation of incompatible
 constituents of the hazardous wastes, including separation of solid wastes from liquid wastes if
 necessary.   Otherwise, mixing of incompatible wastes  could result in adverse chemical
 reactions, which may result  in explosions or other dangerous  effects (e.g., the mixing of a
 highly caustic waste with a strongly acidic waste).  Separation of incompatible wastes  is
 accomplished by subdividing the hazardous waste landfill facility with lined dikes, or perms.
 The  leachate collection system  design  should  also  provide  for separation of chemically
 incompatible forms of leachate.

 As a general  rule, the hazardous waste landfill should accept only  wastes that are in solid
 form, i.e., waste from which there  is no drainage of free liquid when the waste is placed on a
 filter doth.  Appropriate bulking agents may be added to liquid hazardous waste so that they
 conform to the above condition  of moisture content and, therefore, the mixture may be handled
 as a solid.  The placement of liquid wastes within the landfill should  be avoided if the liquid
waste will cause an adverse  reaction  or create problems with respect to leachate generation,
collection, containment, or treatment.
                                                                                   8-50

-------
Groundwater monitoring wells are another important aspect of the hazardous waste landfill
design. Wells should be placed both upgradient and downgradient of the facility, beyond the
limits of the liner. If the facility has a double liner, provisions should also allow for the detection
of leaks between the two liners. The horizontal location of wells and the vertical intervals over
which they are  screened should be carefully  considered.  The  design of the groundwater
monitoring system  should be performed  by a qualified  and  experienced hydrogeolgist or
engineer.
The design, operation, and monitoring of a hazardous waste landfill is a highly sophisticated
undertaking and requires the participation of skilled professionals. The various elements of a
hazardous waste fill are shown diagrammatically in Figures 8-14 and 8-15.

8.15.4    Closure of the Hazardous Waste Landfill
Obviously, the operation of the landfill  is terminated when its capacity has been exhausted.
The closure operation must be designed such that total and complete  decontamination of the
facility is ensured and such that the closed facility does not pose a threat to public safety and
the environment. These objectives are met by  installing a high-quality final cover system and
providing  for leachate management, gas management, site maintenance, and monitoring  in
the post-closure period.  The design of final cover systems is described in Subsection 8.7.
General requirements for landfill closure and post-closure are discussed below (in Subsection
8.17), as well as in Chapter 17.
Post-closure use of a hazardous waste landfill should not be considered viable.  The closed
landfill should not be excavated or disturbed in  any way, since most buried hazardous wastes
continue to be dangerous long after their initial burial.
                                                                                  8-51

-------
                           Protective soil or
                           cover (optional)
Leachate collection
and removal system
, Base sloped to collection pump



   Top liner (geomembrane liner)
                                     r Drain pipe (typ)
                                        Solid waste
                          • X.'voill I_	. ''.T-.Tyy^. »'.x,» ;:,
                          ^«         -   - :  *'-flj!S-&3&
                          ^^:^™*™^^^(:^m
 »;/:'»' j^'lDrainage material "iO^X^«Ky/^K'y'/>Vv
Compacted low-permeability soil
      Leachate detection,
      collection, and
      removal system
  Native sott foundation
             Bottom
             composite liner
            Upper component
            (geomembrane liner)
            Lower component
            (compacted soil)
      Leachate collection
      system sump
           Figure 8-14.  Cross-Section of a Hazardous Waste Landfill System
                     LStandpipe (Internal leachate monitoring and withdrawal)

                                                  Compacted clay (with synthetic iner below)

                                                                Internal leachate collection
                                                                and withdrawal
   Gas vents
   Segregation berm
           and bulk residue
            Figure 8-15. Illustration of a Hazardous Waste Landfill Facility
                                                                                         8-52

-------
8.16  Combined Disposal of Different Types of Wastes
Combined disposal  refers to the  practice of mixing one type  of waste with  another and
subsequently disposing of the  mixture.   Although the combined disposal described in this
section applies to most types of non-industrial sludges, the discussion is directed primarily to
sludges associated with the storage, treatment, and disposal of human body wastes (primarily,
the fecal wastes).   Examples of the latter sludges  are: those produced by a  conventional
wastewater (sewage) treatment facility, septic tank pumpings, sludge  from the storage pits of
unsewered public toilets, and nightsoil in general.
Despite the many hazards to the  public  health and nuisances attributed to the practice, in
several economically developing countries,  untreated nightsoil  frequently is disposed with
municipal solid wastes.  These hazards and nuisances are amplified by the prevalence of the
open dump method  of disposal.   Although perhaps not as pronounced, the same  hazards
attend the open dumping of municipal solid waste and primary (i.e., raw) sewage sludge from a
sewage treatment facility.  The hazards can be substantially reduced by resorting to landfilling.
In an operation involving combined disposal by landfilling, an effective approach is to deposit
the sludge on top of the refuse  at the working face of the landfill. The sludge and refuse are
thoroughly mixed. The mixture is then spread, compacted, and covered in the manner usual to
the landfilling of solid waste.
In order for this approach to work effectively, the applied sludge must behave more like a  liquid
than a solid.  Ideally,  the solids content of the sludge  should be a minimum of 20 to 30%, wet-
weight basis.  Liquid in the sludge is absorbed by  the  solid waste.  In the United States,
municipal solid waste has a considerable moisture absorption capacity, as much  as 60 to 120
kg of moisture per 100 kg of solid waste (wet weight), due to the large concentration of paper.
With such waste,  the weight of water in the sludge should not exceed  about 50%  of the weight
of the solid waste to which it is applied.  Because the moisture and putrescible contents  of
                                                                                 8-53

-------
 solid waste generated in economically developing countries tend to be much higher than those
 characteristic of solid  wastes  in  industrialized  countries,  the absorption capacity of a
 developing country's refuse would be correspondingly lower.  Hence, the maximum weight of
 the water in the applied sludge should be considerably less than 50% of the weight of the solid
 waste.

 In those situations where the sludge cannot be or is not dewatered to about 20 to 30% (for
 example, primary sludges with a moisture content of 2 to 4%), they can be spray-applied from
 a tank truck to a layer of solid waste at the working face, wherein the solid waste serves as a
 bulking agent. For example, the bulking ratio for a sludge with a solids content of 3%  should
 be at least 7 Mg of solid waste to 1 Mg of sludge. If the solids content of the sludge were 20%
 or more, the bulking ratio of solid waste to sludge could  be as low as 4 to 1.  In  practice,
 application of sludges having a solids content approaching 3% should be avoided because of
 the probability of operational problems and adverse health and environmental consequences.
 If combined disposal is practiced and scavengers normally would be present, they should be
 restrained from coming into contact  with the sludges or mixed wastes  in order to protect their
 health and safety.

 A different concept of combined disposal of wastes involves the use of a sludge/soil mixture as
 an interim or final  cover material  over completed areas of the solid waste landfill.  The
 approach has the following potential  advantages:

 1.     The quantity of sludge being disposed at the working face of the landfill  is reduced or
       eliminated by the alternative use of the sludge.

2.     Due to the nitrogen and phosphorus contents of the sludge, the mixture promotes the
       growth of vegetation in the areas where the sludge is applied, thereby reducing fertilizer
       requirements.
                                                                                  8-54

-------
3.     Problems associated  with poor  sanitary  conditions at the disposal area, and with
       erosion,  may be mitigated through the alternative use of the sludge in a sludge/soil
       mixture.

A major disadvantage of the practice of combined disposal, as described above, is its general
limitation to well-stabilized (i.e., digested) sludge. The limitation arises from the fact that the
land-applied sludge is not completely buried.  A potential nuisance and human health hazard
exists when unstabilized sludge is left exposed to humans, vectors, and the elements.

8.17  Landfill Closure
The closing of a landfill requires the design and construction of the following elements:
•      final cover system (cap),
•      leachate management system, and
•      gas management system.

8.17.1    Final Cover System
The performance criteria and design guidelines for final cover systems have previously been
described in Subsection 8.7. The final cover system design must be integrated with the overall
site drainage and erosion control plan to ensure effective long-term post-closure performance
of these systems.  The final grading plan, showing the finished contours of the landfill, should
include  benches or diversion channels at regular intervals to minimize erosion of the  cover
system  and to  control  runoff from the slopes of the landfill.  The recommended maximum
spacing of diversion channels is one per 8 m of elevation gain.
                                                                                 8-55

-------
 8.17.2   Leachate Management System
 The design of leachate management facilities would normally be completed as part of the
 initial design effort. However, prior to closure, the system should be re-examined to ascertain
 that tt is fully functional and appropriate to the service conditions under which it must perform
 in the post-closure period.  Design modifications to leachate pumping or storage facilities, for
 example, may be indicated by such an analysis.

 8.17.3   Gas Management System
 If landfill gas management is to occur by means of passive venting, the venting system should
 be designed in conjunction with the final cover system design (see Subsections 8.7 and 8.13).
 If the  gas management system is an active (dynamic) one, it was probably constructed and
 operated during the active life of the landfill, and system modifications are likely to be needed
 at the time  of closure. These modifications may include additional extraction wells and gas
 collection piping in previously unserved portions of the landfill.  Any penetrations of the landfill
 cap by gas vents or wells should be carefully detailed in the design to ensure an effective,
 permanent seal. The method of sealing penetrations should allow for relative movement of the
 components resulting from settlement of the landfill. The seal must be effective against water
 infiltration and, in the case of active gas collection systems,  against air intrusion into the
 landfill.

 Other  considerations for closure design include the dismantling of temporary structures and
 the restoration of peripheral areas that supported facility operations but were not part of the
 actual  landfill area.  Such areas should, at a minimum, be property  graded,  covered with
                                   «j.
topsoil, and  revegetated - unless they have been designated for some other productive reuse
of the land.
                                                                                  8-56

-------
8.18   Post-Closure Use of Site

If any  portion of the landfill site is envisioned to be used after closure, the closure design

should take into account the specific intended reuse.  For example,  the provision of

recreational playing fields would affect the final contouring of the site, as well as the design of

the gas management and site drainage systems. The nature of closed landfills is such that

they present many obstacles  and  limitations to  site reuse.   The issues surrounding

redevelopment of landfill sites are considered in Chapter 17.


References

1.     Kocasoy, G. and K. Curi, "The Omraniye-Hekimbasi Open Dump  Accident," Waste
       Management & Research, 13:305-314,1995.
2.     Cancelli,  A., "Soil and Refuse Stability in  Sanitary Landfills," Sanitary  Landfilling:
       Process,  Technology and Environmental Impact, T.H. Christensen, R. Cossu, and R.
       Stegmann, eds., Academic Press, London, England, 1989.
3.     Brunner,  D.R.  and  D.J. Keller, Sanitary Landfill Design and Operation,  U.S.  EPA,
       Report No. SW-65TS (NTIS PB227-565), 1972,
4.     Hartley, R.P., Design, Construction, and Operation of Hazardous and Non-Hazardous
       Waste Surface Impoundments, EPA/530/SW-91/054 (NTIS PB91-204354), June 1991.
5.     U.S.  Environmental Protection Agency, Requirements for  Hazardous Waste Landfill
       Design, Construction, and Closure, EPA/625/4-89/022 (NTIS PB90-179664), 1989.
6.     U.S. Environmental Protection Agency, Design, Operation, and Closure of Municipal
       Solid Waste Landfills,  Seminar Publication,  Office of  Research and Development,
       Washington,  DC, EPA/625/R-94/008, September 1994.
                                                                                8-57

-------
 Chapters
 Equipment Selection

 9.1    Fundamental Considerations
 The construction and operation of a landfill requires proper equipment.  Unless much of the
 required equipment can be borrowed from other activities or uses, the acquisition of equipment
 accounts  for a large fraction  of  the total capital investment of  a landfill.  Furthermore,
 equipment operation and  maintenance  usually accounts for a  large portion of the annual
 operating  budget.  Improperly sized equipment and equipment in poor condition usually result
 in capital and operating costs in excess  of the optimum. Consequently, in order for a landfill
 operation  to be optimum, the selection and specification of equipment must be in accordance
 with the type and method  of landfilling chosen for implementation.  The requirements of the
 equipment must take into account the handling, compaction,  and covering of the solid waste,
 as well as the construction of cells and the completion of general earth work.

 The discussion in this chapter considers that the availability of equipment  may be limited in
 many cases  and  that equipment may have  to be borrowed (e.g., from another municipal
 department)  to conduct a  landfilling  operation.   Thus, scheduling  and multiple-use of
 equipment are of general relevance and importance.

 The following fundamental items are discussed below:  1) spare equipment, 2) multi-purpose
 equipment, and 3) maintenance and repair of equipment

 9.1.1     Spare Equipment
A  landfill operation should have spare  equipment in  order to optimize the cost of  landfill
operations and to provide  continuous operations.  The recommended redundancy factor for
large rolling equipment for a specified task is 0.3. The redundancy factor itself is applied to the
number of hours of operation. A maximum potential of 20 hours of continuous duty per day for
                                                                                9-1

-------
 heavy equipment (4 hours are reserved for fueling, maintenance, and repair) is a reasonable
 availability for landfill equipment.

 To calculate the number of spare pieces of equipment, the redundancy factor is added to 1.0,
 the sum is multiplied by the total number of working hours (not exceeding 20 hours per piece
 of equipment) specified by the design and operational plan of the landfill, and the resulting
 product is divided by 20 hours per machine and rounded up to the nearest whole piece  of
 equipment.  For instance, if the design specifies two machines operating a total of 36 hours
 per day (i.e., 18 hours each), using a redundancy factor of 0.3,  the total hour requirement is
 46.8 hours per day. As a consequence of the daily limitation of 20 hours of operation for each
 piece of equipment, three machines are required when the result of the calculation (i.e., 2.34)
 is rounded up.

 Although the purchase  of  spare equipment will  increase the capital budget,  the extra
 equipment will assure continuity of service and normally will extend the  useful life of the
 machines.  The level (i.e., the magnitude) of backup capacity chosen for a particular work
 function affects the  type and frequency of the maintenance  and repair operations.  For
 example, a system with an adequate backup factor can be expected to keep its equipment in
 better repair than a system with an inadequate factor, all other conditions being the same. The
 expectation results from the fact that adequate redundancy of equipment results in the ability
 of the user to service equipment needing repair and maintenance at the time that the service is
 needed, thus avoiding the risk and eventuality of major repairs if simple repairs and preventive
 maintenance are delayed because substitute equipment is not readily available.

 9.1.2     Multi-Purpose Equipment
The use of multi-purpose equipment, i.e., equipment that is capable of performing  more than
one function, is one  means of meeting the redundancy offered by the alternative of spare
                                                                                  9-2

-------
 equipment.  The use of multi-purpose equipment also represents a means of optimizing the
 utilization of equipment and capital equipment expenditures.

 Two examples of multi-purpose equipment are: 1) a landfill compactor which can be utilized for
 compaction, for covering of solid waste, and to build roads on the site; and 2) a tracked loader
 equipped with a multi-purpose bucket, which can be used for moving and spreading cover soil
 and to push and compact solid waste. The strategy of multiple use demands that the time
 requirement for each  particular activity  and that the  associated pieces of  equipment be
 carefully planned during the design of the landfill operation and monitored after implementation
 so that the useful hours for each piece of equipment are optimized for each specific activity.
 The incorporation, or potential of incorporation,  of multi-purpose equipment into a landfill
 operation requires that a schedule and description of the major work activities (e.g., spreading
 and compaction of wastes, covering of compacted wastes with soil) be carefully prepared early
 in the planning stages  of the landfill.  Subsequently, the major activities and the  schedule of
 the landfill operation are compared to the function and availability of equipment from other
 equipment-related  activities  (e.g.,  road  construction).   The  uses of  the multi-purpose
 equipment subsequently are identified and incorporated into  the landfill operational plan. The
 portions  of  the landfill  operational  activities  that cannot be satisfied by multi-purpose
 equipment must be fulfilled by purchased or loaned equipment.

 9.1.3     Maintenance and Repair
 The maintenance and repair of equipment requires detailed planning in order to satisfy one of
the primary missions of the landfill: continuous and satisfactory waste disposal service.  It is
recommended that preventive maintenance and most repairs be performed in the field  in order
to avoid the inconvenience of  transporting the  equipment to a remote  workshop.  An
accommodation for the performance  of  major maintenance and  repair in  the form of a
protected enclosure is a worthy design goal and  instills a sense of the importance of these
                                                                                  9-3

-------
 functions to the  successful operation of the landfill.  Frequent washing of all rolling stock
 assigned to the handling of solid waste is an aid in maintaining the equipment in good repair.
 Washing will help increase the useful life of that equipment and decrease potential frictional
 wear resulting from the buildup of dust and particles in the different mechanical components of
 the equipment (e.g., bearings).  Regular and frequent inspection  and cleaning (including
 washing, if necessary) of the machines' radiators is another task that should be scheduled and
 enforced for all equipment that comes into direct contact with solid waste. This operation must
 be performed at least daily. The other maintenance operations, described in the operating and
 maintenance  manuals  for  the equipment,  catalogs,  or both  that  are supplied by  the
 manufacturers must be programmed into the plan of operations in advance and be performed
 according to the manufacturers' specifications.
                              *
 The operators of  the landfill should be prepared to perform light mechanical repairs (i.e., those
 that require no more than two days to complete).  To accomplish these types of repairs,  it is
 very important that all of the necessary tools and an adequate supply of spare parts be readily
 available at the site. The need for an adequate supply of spare parts  is reduced if a reliable
 supplier is able to provide the required parts within a reasonable period of time.

 9.2   Selection Factors
 Three important factors must be considered when selecting equipment:

 1.      amount of waste to be landfilled and the type of materials to be handled,

2.      economic feasibility, and

3.      availability of adequate maintenance and repair facilities and skilled personnel.
                                                                                    9-4

-------
The issues of economic feasibility and of adequacy of maintenance and repair are especially
important in  developing countries.  However, failure to take into account any  of the three
factors makes the operation of a landfill a virtual impossibility.
The importance of the ability of the equipment to accommodate the steady flow of waste into
the disposal  site is  obvious.  Maintenance and repair are  important as well, since landfill
operations place  great reliance on  large  pieces of equipment operating  under  severe
conditions of duty.

With the  exception of the  smallest of operations,  a landfill involves the movement of large
quantities of materials (soil and solid waste).  The handling of  materials  begins with  site
preparation,  continues through operation of the fill, and  ends with the  closing of the fill.
Because  of  the limitations of  human  performance  and  productivity and other  practical
considerations, the rates of manually moving wastes and soils and of exercising environmental
control are small compared to the typical quantities  of wastes entering the majority of disposal
sites.  Thus, most  land disposal  operations  must rely on mechanization.  Under  certain
conditions, it is possible to  rely on manual labor and on suitably modified  farming equipment
(e.g., tractors).

Under the rigorous  conditions characteristic of landfill  operations, even the most  rugged
equipment breaks down frequently unless it is  conscientiously maintained.  The need for
conscientious maintenance takes on added significance in  economically developing countries
because replacement parts  often are very difficult to obtain,  especially in a timely manner. The
problem of the performance of maintenance is increased further due to scarcity  of personnel
skilled in the maintenance of heavy equipment.
                                                                                   9-5

-------
 9.3   Key Usage Categories for Equipment
 The major areas of usage of landfill equipment can be differentiated into the following three
 categories:
 1.     those activities related to soil (excavation, handling, compaction);
 2.     those activities related to wastes (handling, compaction); and
 3.     other (i.e., supporting) functions.
 Depending on the size of the disposal operation (i.e., quantity of wastes requiring disposal)
 and other operational  conditions, one piece of equipment may have the ability to perform
 several activities among the three  major categories of usage,  i.e., serve  as multi-purpose
 equipment. Versatility is an essential consideration in equipment selection for situations, or
 locations, in which equipment is likely to be used for more than a single use and in which the
 availability of some or all of the necessary pieces of equipment is limited.

 9.3.1      Soil-Related Usage
 The excavation,  handling, and  compaction of soils for liner and  cover  material are  key
 considerations when selecting and specifying landfill equipment.  Procedures and equipment
 for accomplishing the soil-related function tasks differ only slightly from those used in other
 earth-moving operations.  Consequently, the degree of mechanization and  sophistication of
 equipment suitable for  landfilling in a given location would not differ markedly from that which
 is characteristic of earth-moving operations in nearby areas.  This criterion extends as well to
 modifications and variations in equipment, procedures,  or both that may be needed to meet
 specific requirements due to local topographic and soil conditions.  For example, wheeled
equipment usually is satisfactory for excavating  soils in which sand, gravel, clay loams, and silt
loams are  the predominant constituents.  On  the other hand, tracked equipment would be
                                                                                   9-6

-------
indicated for the less workable soils.  Other variations and modifications may also be required
to accommodate seasonal changes in soil properties.
If soil is to be moved over distances shorter than about 100 m, loaders, dozers, etc. used to
move waste in the fill can serve the purpose.  Other types of equipment should be used for
hauling soil distances greater than 100 m.
Spreading and compaction of soil are discussed elsewhere in the document.   Types of
equipment are discussed in Section 9.4.

9.3.2      Solid Waste-Related Usage
Equipment is used at a landfill  to distribute, spread, and compact solid waste. For small-scale
landfill operations, and those locations with limited economic resources, equipment used for
soil-related functions can substitute for those related to solid waste handling.  The spreading
and compaction  of wastes discharged from the collection  vehicles can  be optimized by
confining the  unloading of collection vehicles to the immediate  vicinity of the working face.
Thus,  spreading  and compaction  of the wastes  are  effectively integrated and the overall
efficiency and productivity of the operations are high (minimizing the size of the working face
also is beneficial in terms of controlling environmental impacts).  Additionally, the dual activity
of spreading  and compacting the  wastes conceivably  could  be conducted  by the  same
bulldozer that might be used to move and spread soil.
The compaction of wastes demands careful attention because of its many short- and long-term
effects on the operation of the landfill, and rate and extent of settling.   One of the more
important effects  is the  influence of compaction on the  in-place density of the wastes and
therefore on the quantities of waste that can be disposed in a particular volume of air space.
Heavy equipment specifically designed for compaction of mixed  solid waste is more effective
and efficient for this type of application than is lightweight equipment designed primarily for
                                                                                   9-7

-------
 earth-moving, all other conditions being equal.  However, since in-place density of waste is
 also a function of number of passes of the equipment over the waste, increasing the number
 of passes can be used  to compensate for lesser machine weights, up to a certain  point.
 Spreading the waste in thin layers, in addition to increasing the number of times  the machine
 passes over the layers, also compensates for lesser machine weights. The number of passes
 required to attain sufficient compaction also depends upon the moisture content,  composition,
 and other properties of the waste. Additional discussion of the relation between equipment
 specifications and compaction performance is presented in Chapter 10.

 Landfill equipment must be rugged because operating conditions in a landfill environment are
 harsh.  Radiators tend to become clogged and damaged, and the body and operating parts of
 the equipment can be damaged by protruding or dislodged wastes.  Tires, even of heavy-duty
 construction, frequently can be punctured or cut.  These  circumstances demonstrate the
 necessity of maintaining  a parts inventory and an adequate repair and maintenance facility
 convenient to the fill.

 9.3.3      Supporting Functions
 With respect to the initial  and subsequent  construction phases of a landfill, equipment may be
 needed for the installation of roadways  and of environmental  control measures  such as
 geomembrane liners and covers,, monitoring wells, leachate collection facilities, and gas vents.

 Support functions during the operational phase include extension and maintenance of roads to
 the working face of the fill, dust control, and fire protection.  Unless the collection and transport
 vehicles  delivering  waste to the site  are equipped with self-unloading  features, support
 equipment might be needed to assist in the unloading of waste.  This situation exists especially
 in those locations with primitive and poorly maintained collection vehicles.  Generally, some of
the support functions (such as road extension and maintenance) during the operational phase
can be supplied by the machine used for spreading and compaction of soil and solid wastes.
                                                                                  9-8

-------
9.4    Types of Equipment
The selection of equipment should be based upon the primary use, and the ability of the
equipment to accommodate successfully the conditions peculiar to the  site.  A secondary
consideration is the ability of equipment to meet multiple uses. The considerations related to
the primary use include those imposed by the soil; topographical and climatic characteristics of
the  site;  waste  characteristics, quantity, and  delivery rates; and budgetary  constraints.
Possible off-site use is another consideration.
The main uses and characteristics of the different types of equipment used at  landfills are
discussed below.

9.4.1      Track-Type (Tracked) Tractors with Push-Blades (Bulldozers)
9.4.1.1    Use
Bulldozers are  used to distribute and  compact solid waste, as  well  as  to perform  site
preparation, distribute daily and final cover, and conduct general earth work. A  photograph
showing a bulldozer is presented in Figure 9-1.
9.4.1.2    Characteristics
Bulldozers are equipped with metal tracks having variable standard widths, such as 460, 510,
560, and 610 mm. The tracks must have cleats that are sufficiently high  to size reduce (i.e.,
crush and tear) the solid waste and to prevent slippage and sliding of the equipment down the
working face or other slopes.  The pressure exerted on the solid waste is achieved by
distributing the weight of the machine over the contact surface. The following table presents
some typical values for these machines.
Power
(kW)
100
150
220
Weight
(kg)
11,750
16,100
24,800
Area of Contact
with Refuse (m2)
2.16
2.76
3.19
Pressure
(kg/cm2)
0.54
0.58
0.78
                                                                                  9-9

-------
                                 Figure 9-1. Bulldozer

The degree of compaction of the solid waste depends on the pressure exerted.  As mentioned
before, the thinner the layer of refuse, the more effective the pressure applied to the bottom of
the layer. Tracked machines are not very efficient at compacting solid wastes due to their low
ground pressure.

In order to obtain maximum efficiency from a track-type machine, it should be equipped with an
adequate blade to push the material.  The density of solid waste discharged from a collection
vehicle is about one-third that of soil; therefore, the physical size of the blade can be increased
without overloading of the equipment.  The capacity of a blade can be increased by increasing
its height.  A steel screen can be used to increase the height of the blade without interfering
with the operator's visibility, as would be the case of a solid plate used as an extension.  The
dimensions of the blades vary with each model. For example, a typical 100 kW machine would
have a blade with the following dimensions:
•      width (straight): 3.2 m,
•      height (without screen): 1.1m, and
•      height (with screen): 1.8 m.
                                                                                  9-10

-------
The push-blade is controlled through a hydraulic mechanism. The estimated productivity for a
typical 100 kW model, on flat surfaces, is on the order of 50 Mg of solid waste per productive
workhour. On sloped surfaces, the  production will be  less: in the case of a slope of 20°,
production will be reduced to about 40 Mg/hr for the 100 kW model mentioned above.

9.4.2     Steel-Wheeled (Landfill) Compactors
9.4.2.1    Use
Compactors  are used for spreading and  compacting the incoming solid waste.  A photograph
of a steel-wheeled compactor is presented in Figure 9-2.
                     Figure 9-2.  Steel-Wheeled Landfill Compactor

9.4.2.2    Characteristics
Compactors are typically equipped with either a standard or turbo diesel engine.  The metal
wheels usually have alternated, inverted, V-shaped teeth that allow them to concentrate the
weight of the machine on a smaller contact surface than  that characteristic of a track-type
machine and, consequently, to exert a greater pressure on the solid waste.  The following
table indicates the average pressure for two types of compactors based on the area of contact.
                                                                                9-11

-------
Power
(kW)
110
130
Weight
(kg)
16,000
26,000
Average Pressure
(kq/cm2)
75
120
 Operating under similar conditions, compactors are in general more versatile and faster than
 bulldozers in the spreading and compacting of solid waste. A typical 110 kW model will have a
 productivity of approximately 75 Mg/hr on flat surfaces.  The productivity decreases to about
 60 Mg/hr if the working slope is 20°.
 Steel-wheeled compactors are equipped with a hydraulically controlled blade. The blade has
 an additional metal screen to increase its capacity.  The common dimensions of the blade are
 as follows:
 •     width: 3.0 m, and
 •     height (with screen): 1.9 m.

 9.4.3     Wheel Loaders
 9.4.3.1    Use
 Wheel loaders are used to excavate soft soil (i.e., soil offering little resistance), load excavated
 material  onto  trucks, and  transport material over distances not greater than 50  to 60 m (for
 optimum efficiency), A photograph of a wheel loader is presented in Figure 9-3.
 9.4.3.2   Characteristics
 Wheel loaders generally are equipped with a diesel engine and four-wheel  drive. The units
 can be equipped with solid, pneumatic, or foam-filled tires.  The type of tire selected depends
on the application  and on the working conditions.  Solid and foam-filled tires are favored in
those applications where the tires are exposed to sharp objects that can cut and  puncture the
tread or sidewall. The front axis is fixed and the rear axis can oscillate. Models vary in power,
ranging from 50 to 370 kW. The capacity of the bucket varies from  0.8 to  6 m3. The most
                                                                                  9-12

-------
                              Figure 9-3. Wheel Loader

commonly used models are those falling in the range of 75 to 110 kW. Some characteristics
of wheel loaders are presented in the following table:
Power
(kW)
75
100
Weight
(kg)
9,280
11,550
Bucket Capacity
(ms)
1.34-1.72
1.72-2.68
If the soil is soft, a 100 kW wheel loader with a bucket capacity of 1.9 m3 would be able to
excavate and load a dump truck at a rate of about 160 m3/hr. If the ground is firmer (i.e., offers
more resistance to penetration by the bucket), the productivity would decrease.  To maintain
the same productivity, a more suitable piece of equipment would be needed to perform  the
excavation work.
                                                                                9-13

-------
Wheel loaders also possess the capability to perform efficient earth work with clay-like soil,
such as the covering of waste, and to prepare sites for landfilling.

9.4.4     Track-Type (Tracked) Loaders
9.4.4.1    Use
These machines can perform similar functions as the wheel loaders. Track-type loaders are
also able to excavate well-compacted and tough soil.   Their  optimum  material transport
distance usually does not exceed 30 m. Their low bearing pressure is beneficial and in fact
necessary in a number of landfill operations, e;g., carrying soil on a muddy or soft surface.

In emergency situations and in cases where the daily deliveries of quantities are small, track-
type loaders can be used to handle (i.e., to spread and compact) solid waste.  They can also
be utilized to contour and level the  cover material. In some cases, the track-type loader may
be more efficient and flexible than a track-type machine equipped with a push-blade.
9.4.4.2    Characteristics
Tracked  loaders are equipped with 50 to 200 kW diesel engines.  The following table describes
some parameters and typical values for this type of equipment.
Power
(kW)
70
100
140
Weight
(kg)
12,340
13,700
21,300
Area of Contact
with Refuse (m2)
1.54
1.79
2.48
Bucket Capacity
(m3)
1 34
1.34 to 1.74
1.90 to 2.48
The bucket in track-type loaders is operated through a hydraulic mechanism.  In many cases,
better efficiency and flexibility in operational activities can be achieved when this equipment is
equipped with a multi-purpose bucket. This type of bucket performs four different operations,
according to the position in which the bucket is operated.
                                                                                  9-14

-------
The bucket has a stationary section and a moving section.  Movement can be controlled by the
operator with the same lever control. With a multi-purpose bucket, a track-type loader can
serve as the following types of equipment
1.     Loader - Opening the grapple will allow the material within the bucket to be totally
       discharged.
2.     Dozer - Lifting the moving section will allow pushing and leveling of the material.
3.     Scraper - In soft and/or clay-like soils  the cutting action can be controlled with the
       grapple opening.
4.     Clamp Bucket - The loader can  be used to lift materials like trunks and branches of
       trees. This can be accomplished by holding the material between the grapple and the
       edge of the bottom part of the bucket.
The versatility of a track-type loader is beneficial in applications such as landfills, especially
when the availability of equipment in general is limited or when financial resources are limited.

9.4.5     Track-Type (Tracked) Excavators
9.4.5.1     Use
Two  types of excavators  are  relevant to heavy  landfill work:  1) the  common track-type
excavator in which  the bucket and excavating motion are toward the cab, and 2) the front-
shovel model in which the excavating motion is away from the cab. Common excavators are
used to excavate soil and load hauling equipment, and to apply the daily or primary cover to
solid waste (e.g., in the trench method).  This equipment can also be used for certain tasks in
earth work operations. As  with all tracked equipment, the load (vehicle and working load) is
distributed  over a large track area, thus minimizing the  bearing  pressure on the soil.  This
feature is important in some landfill operations, e.g.,  in muddy or soft soil conditions.  This
                                                                                  9-15

-------
 equipment has the capability of digging deep excavations at high rates of productivity (the
 smaller tractor-type excavators, e.g., backhoes, have a more limited depth of reach and a
 lower productivity than track-type excavators).
 9.4.5.2   Characteristics
 The  excavator is equipped with a diesel engine and a hydraulic system to control the
 movement of the loading arms and that of the bucket.  Typical engine sizes are in the range of
 100 to 500 kW. As mentioned above, the bucket of the common excavator faces the cab and
 the excavating movement of the arm is toward the operator.
 The excavation cycle is composed of four phases:
 1.     loading of the bucket,
 2.     rotation when loaded,
 3.     opening of the bucket and discharge of material, and
 4.     rotation when unloaded.      .;.,

 The length of time of the excavation cycle  depends on the size of the equipment and on the
 site conditions. When the excavation is difficult or the trench is deep, the time to excavate will
 be slower than for a set of less difficult conditions. The manufacturers' literature on the market
 typically describes the cycle time, or its method of calculation, according  to the equipment
 model and particular types of  site  conditions (e.g., type of soil, excavation  depth).  The
 excavation depth (measured from the ground level) depends on the reach of the loading arms.
The following table provides some typical specifications for excavators:
                                                                                  9-16

-------
Power
(kW)
100
145
240
Weight
(kg}
22,680
34,020
56.200
Length of
Loading Arm
(m)
2.44
2.90
3.20
Bucket
Capacity
(m3)
0.75
1.18
1.94
Maximum
Depth of
Excavation
(m)
6.4
7.3
8.5
 9.4.6     Front-Shovel Excavators
 9.4.6.1    Use
 Front-shovel excavators are used to excavate trenches for the placement of solid waste, to
 load soil and rock into hauling vehicles, and to perform the daily or primary covering of landfill
 cells (without compaction or leveling of the solid waste). As mentioned previously, front-shovel
 excavators differ from the more conventionally observed excavator in that the bucket opening
 faces opposite the cab and the articulated motion of the bucket is outward from the cab.  Thus,
 the front-shovel unit is limited mechanically to digging near the surface and moving piles of
 material at surface level and does not have the excavation reach of the common excavator.
 This equipment is unsuited to the digging of deep excavations.
 9.4.6.2    Characteristics
 Front-shovel excavators are mounted on tracks and equipped with a diesel engine having
 power ranging from  about 300 to 600 kW. The tracks are formed by shoes typically having a
width of 600 to 700  mm.  These machines are equipped with a boom that is operated
mechanically.  The  length of the boom  can vary from 10 to 15 m.  The operational turning
radius varies, according to the equipment, from 6 to 13 m.  Depending on the type of soil and
on the size and use of the bucket, this type of excavator can reach to depths up to 4 m.  The
buckets generally have a capacity of either 0.6 or 0.8 m3. The weight of a 100 kW front-shovel
excavator is about 20,500 kg.
                                                                                9-17

-------
9.4.7     Motor Grader
9.4.7.1    Use
Motor graders are used in the construction and maintenance of hauling roads, embankments,
and drainage ditches, and the profiling and leveling of cover material.  A photograph of a
grader is shown in Figure 9-4.
                                 Figure 9-4. Grader

9.4.7.2    Characteristics
Graders are equipped  with a  diesel  engine, rubber wheels, and  power steering.  Typical
weights and power for this type of equipment are presented in the following table:
Power
(kW)
90
165
Weight
(kg)
12,000
18,280
The standard blade for these machines has the following dimensions:
•      length: 4.0 m,
•      height: 0.7 m, and
                                                                                9-18

-------
•      thickness: 25 mm.
The blade can reach a maximum slope of 90° and is able to adopt different axial positions.

These machines can carry a scraper as additional equipment.  The scraper is used to rip the
ground or to mix soils.   A typical scraper attachment has 11 teeth shaped as hooks, with
replaceable ends.  The scraping depth varies according to the model, generally in the range of
0.2 to 0.4 m.

9.4.8.    Scrapers
9.4.8.1   Use
Scrapers are used to excavate,  haul,  and distribute  large volumes  of soil at  high rates of
productivity on relatively flat or moderately hilly soil surfaces.  Because of their high  rate of
productivity, they are commonly used at large landfills to excavate and distribute soils for cover
and for liners.  A photograph of a wheeled scraper is presented  in Figure 9-5.
                 P-';:S;:;?:S1::;^V;:X:^
                                                                  ;•:



                                   Figure 9-5. Scaper
                                                                                   9-19

-------
 9.4.8.2   Characteristics
 Scrapers can be self-propelled or towed by separate equipment, e.g., by a bulldozer they are
 relatively maneuverable.  They  are equipped with a cutting  blade or elevating conveyance
 system that cuts and directs the excavated soil into a storage unit. The volumetric storage
 capacities are in the range of 10  to 40 m3.

 The approximate earth-moving capacities for loaders and scrapers are presented in Table 9-1.
        Table 9-1. Approximate Earth Moving Capacities for Average Soils (ms/hr)
Capacity of Units
(m3) 0 30 60
Tracked Loader
1% 40 30 25
V/2 50 35 30
2 80 60 45
Pulled Scrapers
14
12
7
Self-Propelled Scrapers
20 	 :: '-•"•: •';'•
14 .
11
One-Way Haul
90 120
•
20 15
25 20
40 35

190
165
90




Distance
150
~ • -
-
15
30

170
145
80

400
250
170
(m)
180





150
125
75
-
380
240
160
240





125
100
60

340
210
140
300





100
75
55

300
180
120
9.4.9     Sheeps Foot Compactors
9.4.9.1    Use
Sheeps foot compactors are used to compact soils and embankments.
9.4.9.2    Characteristics
A sheeps foot compactor can be either self-propelled or pulled by a tractor.  Basically, it is
composed  of  two cylindrical drums with  "feet" that convey pressure to the  soil  to be
compacted.  The drums can be ballasted with water.  The average pressure depends on the
                                                                                9-20

-------
type of toot" used.  There are several designs.  A compactor composed of two cylindrical
drums has the following specifications:
•      diameter. 1.53m,
•      rolling width (2): 3.4 m,
•      number of feet per drum: 120,
•      weight of drum with water ballast: 12,600 kg, and
•      pressure exerted on the ground: about 27 to 82 kg/cm2.
Since these machines have a mechanism that  allows articulation of the drums, uniform
compaction can be achieved even on irregular layers of soil.

9.4.10   Pneumatic Tire Compactors
9.4.10.1  Use
Pneumatic tire compactors are used in the compaction of topsoils and sublayers, especially
when loamy material is present High  and uniform densities can be obtained throughout the
thickness of the layers.
9.4.10.2  Characteristics
These machines can be either self-propelled or pulled by tractors.  The load is transmitted to
the ground through the contact surface of the tires, which form the rolling unit. Typically, these
compactors have seven tires.

The ballasting of the equipment is accomplished using wet sand (density = 2,000 kg/m3), which
results in working weights in the range of about 13,000 to 35,000 kg.  The operation is as
follows:

•      Initially during the  rolling of the soil, low tire pressures are used  in order to produce
       sufficient pressure to somewhat compact  the soil  without the  tires  sinking  into and
                                                                                 9-21

-------
       rutting the soil.  Low tire pressures result in a large contact area of the tires, and
       therefore low vertical pressure applied to the soil.
           ' ; i  :   . -;
 •     As the rolling  and compaction process progresses, the tire pressures are gradually
       increased, thus  reducing the contact area  and therefore  increasing  the pressure
       applied to the soil.
 These machines have a system that controls the pressure of the tires to the proper level.

 9.4.11    Self-Propelled Vibratory Drum Compactors
 9.4.11.1   Use
 Vibratory drum compactors are used to compact soils and cover material formed by normal,
 granulated, or clay-like soils.  '" '
 9.4.11.2   Characteristics
 This  category  of machine  is specially designed  and constructed to effectively  produce
 compaction of the type  of soils mentioned above. Vibratory drum compactors have a metal
 drum on the front. The approximate dimensions of the drum are:
                                           •^ * "i"-
 •     width: 2.2  m, and
 •     diameter 1.5m.
The compactors have pneumatic tires on the back.   The vibration  system is operated by a
 hydrostatic engine directly connected to the vibrator, allowing variations  in amplitude and
frequency, independent  from the speed of the propelling engine.  The vibration frequency can
be regulated to reach a  maximum of up to 2,000 vibrations/min.  The weight of the equipment
varies according to the model (9,000 to 12,000 kg).

9.4.12    Drainage of Ditches
There are two types of equipment that can be used to perform this task:
                                                                                  9-22

-------
 1.     Centrifugal  pumos driven bv  internal combustion  engines - The power rating of
       engines for this type of pump is typically in the range of 6 to 10 kW.  In this range of
       power, pumping capacities of 6 to 30 m3/hr usually can be achieved, depending on the
       efficiency of the system, the line losses, and the gravitational head.
 2.     Submersible pumps with electric motors - These types of pumps are recommended for
       the handling of leachate.  The range of pumping capacities for these types of pumps is
       typically in the range of about 8 to 15 m3/hr.

 9.4.13   Rubble Shredders
 The purpose of these machines is to shred large soil particles in order to obtain adequate size
 distribution of the cover material.  The machines usually have a power rating of about 100 to
 300 kW.  These shredders usually are driven by an internal combustion engine or an electric
 motor.

 9.5   Inspection and Maintenance
 As previously  indicated, the costs  associated with operation and  maintenance  of  the
 equipment used in landfills account for a major portion of total operating costs.  Frequent
 inspection and a systematic maintenance program are necessary to keep equipment running
 productively.  Conversely, the neglect of preventive  maintenance can lead to severe problems
 that are very costly to remedy, require  inordinate lengths  of time  to correct, or  both. With
 respect to operation of a landfill, the neglect of proper maintenance and  repair can take the
 form of machinery breakdowns, inadequate compaction, or insufficient application of cover
 material.   Poor compaction and lack of application of cover material can result in adverse
impacts to the public health and to environmental pollution.

Consequently, a strong recommendation is made for regular inspection of the equipment used
in  landfill  operations.    Some of  the equipment  may require daily inspection and other
                                                                                9-23

-------
 equipment may need only weekly inspection.   Continuous operation and low frequency of
 breakdowns (i.e., cumulatively leading to high equipment availability) can be achieved only
 through the implementation of a preventive maintenance program.  The maintenance program
 should be based on guidelines provided by the equipment manufacturers and supplemented
 by good preventive maintenance practice.
 In connection with the importance to be given to preventive maintenance and proper repair,
 proper facilities must be provided at or near the landfill for carrying out the various tasks of
 maintenance and repair.  Proper facilities include garages, tools, testing equipment, and a
 stock of replacement parts.  Equipment manufacturers should be required to provide a list of
 basic replacement parts, and the name and location of a source for spare parts.  Ideally, the
 source should be located within the country.

 9.6    Equipment Requirements
 The number and types of equipment needed for the landfilling of solid waste are governed by
 many factors.  The factors have been described throughout this section.  One of the key
 factors is the required rate  of landfilling. of solid waste, i.e., the daily mass flow of wastes
 received at the facility.  As guidance to the reader, some suggested equipment requirements
 are presented in Table 9-2.  When reviewing the table, it should be borne in  mind that the
 availability of proper equipment for landfilling operations can be a substantial problem in some
 economically developing  countries.    Thus,  in some cases, compromises in  equipment
 requirements and performance may be required in order to conduct a landfilling operation.

 Landfill equipment can be owned or  leased, depending on local conditions and procurement
 policies. Regardless of method of procurement, it should be kept in mind that: 1) the useful life
of landfill equipment is relatively short, e.g., 5 to 10 years, due to the difficult and strenuous
                                                                                9-24

-------
operating conditions; and 2) equipment life is  optimized  through the implementation of a

dedicated preventive maintenance program.
                   Table 9-2. Suggested Equipment Requirements
                         as a Function of Waste Generated
Mg/day
Oto20
20 to 50
50 to 130
130 to 250
250 to 500

Quantity
1
1
1
1
1
and
1or2of

Type
TD
TL
RTL
SWC
TD
TL .
RTL
SWC
TD
TL
RTL
SWC
TD
TL
RTL
SWC
TDor
SWC
TL, RTL,
Equipment
Weight (kg)
<6,800
<9,000
<9,000
N/A
6,800 to 9,000
9,000 to 11, 000
9,000 to 10,000
smallest available
9,000 to 11, 000
11, 000 to 15,000
10,000 to 12,500
as available
14,000 to 16,000
15,000 to 20,000
12,500 to 16,000
14,000 to 19,000
21, 500 to 24,000
S, DL, or WT

kW
<60
<50
<75
N/A
60 to 80
50 to 75
75 to 90
80 to 100
75 to 100
90 to 110
110
110 to 130
110 to 140
110 to 140
110 to 140
190 to 220
     TD:     Tracked dozer              S:
     SWC:   Steel wheeled compactor     RG:
     WT:     Water truck                RTL:
     TL:      Tracked loader              DL:

  Adapted from Reference 1.
Scraper
Road grader
Rubber tired loader
Dragline
                                                                            9-25

-------
Reference

1.    Brunner,  D.R. and D.J. Keller, Sanitary Landfill Design and Operation,  U.S.  EPA,
      Report No. SW-65TS (NTIS PB227-565), 1972.
                                                                             9-26

-------
 Chapter 10
 Operation

 10.1  Introduction
 Successful operation of a landfill requires careful planning, effective management, proper use
 of labor and mechanical resources, and frequent monitoring of performance.  The monitoring
 of performance begins with the receipt and landfilling of wastes and continues through those
 operational  activities that bear on the protection of human health and safety  and on the
 protection of the environment.  All of the activities and considerations that compose the
 operation of a landfill are described in this chapter. By the very nature of a landfill operation,
 the  primary  operational  considerations involve  heavy equipment, labor, and  control of the
 impacts of landfilling on the public health and on the environment.
 The chapter is organized  into three  parts:  1) general procedures  (i.e., those  that are
 independent of the type of landfill used);  2) specific operational procedures (i.e., those that
 depend on the type of landfill used); and 3) performance monitoring. In addition, a discussion
 is presented addressing monitoring for potential negative environmental problems.

 10.2  General Procedures
 Operational  considerations that apply to all types of landfilling operations include the following:

 •      hours of operation,

 •      site preparation and maintenance,

•      inclement climate,

•      waste receipt and vehicle routing,
                                                                                  10-1

-------
 •     environmental control,

 •     self-haul, and
 •     salvaging/scavenging.

 10.2.1   Hours of Operation
 A  common  practice in  the operation  of a  landfill  is  that operating hours  are set to
 accommodate the schedule of waste collection.  However, proper control and management of
 disposed wastes, and proper accounting of waste quantities  at the landfill, may require
 modification  of collection practices and schedules to accommodate  site operations. As an
 example, disposal sites in the United States typically are open from early morning (e.g., 6:00
                           ~i
 a.m.) to late in the afternoon -(e.g., approximately 4:00 to 6:00 p.m.).   The time period of
 operation of the landfill should take local traffic conditions into consideration.
 Operating hours  may be modified based upon seasonal frequency  of generation of waste.
 Certain periods of the year may  result in greater waste  generation  than other times,  (e.g.,
 tourist seasons or festivals).  If the disposal site is not open 24 hours per day, the gates should
 be dosed such that the operators will be allowed sufficient time to cover the day's waste
 deliveries and for general cleanup.   Large  containers can  be placed outside the gate to
 accommodate the disposal  of small quantities of wastes delivered after normal operating
 hours.   Posting and announcements of disposal  hours is  an important  aspect of landfill
 operations.

At the beginning of the day,  personnel should arrive at the facility sufficiently early to prepare
the equipment and the site for operation prior to the arrival of the  first  loads of wastes. Among
typical  preliminary activities  are: relocation of fencing for control  of litter,  maintenance and
fueling of equipment, preparation of unloading areas,  cleaning  of roads, setup for weighing
and recordkeeping, and snow removal (where relevant).
                                                                                  10-2

-------
 10.2.2    Site Preparation and Maintenance
 10.2.2.1   Site Preparation
 As the working area is filled and additional areas are required for filling, those new areas
 should be cleared, excavated, and lined.  Similarly, as the working areas are filled, a final
 cover should be applied on them as soon as possible.   -
 The  sites must be  prepared  and  constructed  according to design  specifications.   Site
 preparation and construction include:
 •      clearing and grubbing,
 •      installation of surface water drainage systems,
 •      excavation to meet design requirements,
 •      installation of liners and leachate collection systems,
 •      erection of building structures,
 •      installation of utilities,

 •      installation of perimeter fencing,

 •     constructions of roadways, and

 •      soil stockpiling.
 10.2.2.2   Road Maintenance
 Maintenance of access roads at landfill sites is a continuous process.  Road maintenance
 often is an expensive operation.  Regardless of the type of surface (soil, gravel, or pavement),
the roads  must be inspected and maintained frequently.  Typical repairs include cleaning,
adding  or grading soil and gravel, filling holes, and cleaning drainage ditches.  Since proper
road maintenance is a costly operation, it often is neglected. Lack of proper road maintenance
                                                                                   10-3

-------
 subjects vehicles using the disposal site to potential damage and unnecessary delays, and
 creates unsafe conditions. A few sections of well-marked rough areas, or speed bumps, can
 be placed on some roads in order to control excessive speed and, therefore, reduce wear and
 tear on the roads.
 10.2.2.3  General Maintenance
 All waste treatment and disposal sites require continuous maintenance. At the beginning of
 the operation, the site manager should  prepare a detailed maintenance schedule.  Specific
 dates should be identified for the performance of tasks. The types of tasks that are required
 include:
 •      the collection and disposal of litter,
 •      maintenance of gates, fences, and buildings;
 •      maintenance of road and drainage systems and final cover; and
 •      the preparation and upkeep of site maps.

 As areas of the landfill are filled and completed, a series of maps indicating their status should
 be maintained and updated.  The maps should identify,  by areas, the types of waste that were
 landfilled, including special wastes, the depth of the fill, as well as other site-specific features.
 An example map, showing the sequence  of operation, is given in Figure 10-1.

 10.2.3    Inclement Climate
 The proper management of the consequences of adverse meteorological conditions plays an
 important role in the successful operation of a landfill site. Long periods of excessive rainfall,
freezing temperatures, or extreme heat can disrupt routine operation of a landfill. The amount
of rainfall during site preparation has a direct impact on the moisture content of the soil, as well
as  on groundwater  levels.    Both of these parameters  are important in the control  of
                                                                                  10-4

-------
     Sequence 1
     Sequence 2
    Sequence 3
Excavation
Fill and cover
Operation
Seeding and maintenance
Storage of cover
Areas of site
Figure 10-1.  Typical Sequence of Operation
                                                            10-5

-------
 soil strength and  permeability during construction of a clay  liner or other compacted soil
 components. Extremely low temperatures (e.g., freezing conditions during construction of the
 landfill site) also impact soil workability and permeability. Ambient temperature can affect the
 installation of geomembrane liners, in particular the adequacy of seams and their performance.

 Meteorology can also have  an impact on the performance and operation of the facility.  In
 locations that experience heavy rainfall, conditions can lead to extremely muddy access roads
 and unloading areas, which leads to long delays to users of the site, unless proper precautions
 and preventive measures are put in place.  Extremely high precipitation also may increase the
 level of  the groundwater and therefore impact groundwater diversion systems designed  to
 protect the fill from groundwater intrusion.  Soils  wetted and saturated with precipitation can
 also become unstable if unsupported (e.g., the sidewalls of a  trench operation) or if piled  or
 sloped at steep angles.  One of the more effective  means of managing heavy rainfall and
 surface water flow is to maintain the slopes of the drainage canals on the periphery of the site
 so that they continue to divert water away from  the wastes.  In the event that the  site is
 relatively flat, leachate collection systems help to reduce some of the problems associated with
 increased precipitation. However, if the leachate collection system does not have the capacity
 to accommodate the extreme conditions, liquid pressure will build up in the facility. High liquid
 pressure may result in leachate migration from the site.  Decreased soil density, which may
 cause liner instability, may also result from heavy precipitation.

 On the other hand, very dry weather conditions can result in very hard soil that is difficult to
 excavate or compact.  In addition, in the absence or near absence of moisture, organic matter
 does not readily decompose. In arid areas,  evaporation from the ground typically is greater
 than precipitation.  Consequently, very little or no leachate is formed within the fill.  Landfills in
arid and  semi-arid regions may  be  operated without bottom liners and leachate collection
systems,  provided  that there is adequate protection of the groundwater. In fact, it has been
suggested that the best sites for landfills are  in arid regions [1].  Dry soil may also lead to  the
                                                                                  10-6

-------
formation of cracks and increase the permeability of the soil.  Freezing temperatures may
cause stockpiles of soil to freeze and become unusable. Temperatures below freezing may
affect the proper operation of site equipment, as well as components of the leachate collection
system located  above the frost line.  Efficient  operations require that operational problems
such as those described above be  anticipated and that contingency plans be developed by
management in  order to address the problems satisfactorily. In Table 10-1 are listed problems
due to inclement weather, and potential solutions.

10.2.4    Waste Receipt and Vehicle Routing
Every landfill operation should  maintain a controlled  gate.  A gate enables the operator to:
1) keep  records of weights  or  volumes of incoming  loads, 2) direct incoming vehicles to a
specific location, and 3) reject materials that cannot be disposed properly on the site. Signage
which clearly indicates site regulations,  operating hours, user (tipping)  fees,  emergency
telephone numbers, permit information, and other relevant data should be placed on the gate.
Monitoring the quantities (weights or volumes) of residues received at the landfill allows an
operator to assess the efficiency of the operation in terms of land use and compaction. These
records also allow the operator to predict, with a certain degree of accuracy, remaining site life.
Remaining site life can be calculated in conjunction with topographic surveys or aerial surveys.
Aerial surveys may be unnecessary, too costly, or both for certain locations. In addition, user
fees can be properly and accurately assessed by monitoring the quantity of waste received.
There are various  methods to monitor the quantities of waste received.  Most large, modem
landfills utilize truck scales.  Although it is preferable to monitor weights, sites receiving
relatively small quantities of waste may opt instead to record volumes of waste.  In the
absence of a permanent scale on the site, weights of waste may be determined over a short
term for the purpose of monitoring and estimating the inflow of waste by using a rented,
                                                                                  10-7

-------
                        Table 10-1. Inclement Weather Practices
   Problem
Solution
   Muddy Access Roads
   Muddy Unloading Area
   Wet/unworkable Soil
  Soil Permeability/Density -
  varies from design
  Leachate Collection System -
  clogging from runoff

  Dry Soils - unable to excavate
  and increased permeability
  Frozen Soil
Wet Weather
• Add cinders, crushed stone, or demolition debris
• Maintain a special working area that has permanent
  roads
• Inspect for positive drainage and clean and maintain
  drainage systems as required

• Stockpile well-drained soils and apply as necessary
• Keep compactive equipment off area by unloading
  and moving refuse perpendicular to area
• Grade unloading area slightly to permit runoff
• Inspect for positive drainage and clean and maintain
  drainage systems as required

• Maintain compacted, sloped stockpiles and/or cover
  with tarpaulin

• Do not compact soils during overly wet weather
  conditions
• Protect soil from the elements (e.g., cover)

• Add barriers for fines
• Periodic cleaning of pipe network

Dry Weather
• Cover soil to prevent drying
• Wet soil

Cold Weather
• Insulate stockpiles with leaves, snow, or straw
• Salt soil
• Continually strip and cut soil
• Maintain well-drained soil/sand
• Use hydraulic rippers on frozen soil
portable scale. The results of the weight survey can be used to develop user fees and to

estimate waste receipts over an annual period. Of course, this  method does not take into

consideration any changes in the waste stream and, therefore, quantities after the survey is

completed.
                                                                                  10-8

-------
 f 0.2.5   Environmental Control
 In most situations, regulations are established which require the inclusion of environmental
 controls to protect the environment from the potential negative impacts of landfills. The most
 commonly used types of environmental controls include impermeable barriers (liners), leachate
 collection systems, landfill gas control systems, and cover systems.  The proper design and
 construction of these controls are discussed in Chapter 8.   Environmental  controls are nec-
 essary to protect the environment during landfill operation and during closure and post-closure.
 These practices are described in the following sections and are outlined in Table 10-2.
 10.2.5.1  Leachate Control System
 The generation and control  of leachate is an important aspect of landfill operations because
 the liquid may migrate beyond the boundaries of the facility and contaminate both ground and
 surface waters [2]. The rate of ieachate production can be substantially reduced  by covering
 the solid waste during facility operation with a material having a low permeability. Leachate
 production can be controlled after closure of the site by installing and properly maintaining a
 final cover system that minimizes the amount of liquid that penetrates into the waste.  In most
 cases, leachate will be produced in municipal solid waste disposal  facilities.  Therefore,  in
 those disposal facilities that have liners, a leachate collection System must be installed, and
 property operated and maintained, in order to prevent the accumulation of leachate and, thus,
 avoid excessive pressure on the liner or soil walls of  the  landfill.  Leachate production,
 collection, and treatment system operation are discussed in References 3,4, and 5.
 10.2.5.2  Siltation and Erosion
 Improper grading generally leads to production of runoff containing high concentrations of silt.
 During operation of the landfill, grades should be maintained between 2 and 5%, if possible, to
 promote surface drainage and, at the same time, to minimize flow velocities. Areas lacking
vegetative cover should be kept to a minimum during site operation.  Ongoing construction and
maintenance of sediment control devices (e.g., grass waterways,  diversion ditches, rip-rap,
sediment basins) are critical for an environmentally sound operation. During final closure of
                                                                                  10-9

-------
Table 10-2. Environmental Control Practices in Landfill Operations
Practices

Safety program
Maintain washrooms
for personnel
Training of new
personnel
Maintain road
markings and trench
barriers
Maintain fencing
Apply insecticides
Maintain buffer areas
and grass
Proper equipment
maintenance
Spray water/liquid
asphalt
Truck wash pad (to
clean trucks)
Maintain grass
waterways, diversion
ditches, rip-rap
Final grading of
disturbed areas

Leachate




V








V







•
V

Spillage


V

V

V



-
V


'
I








Siltatlon &
Erosion



V

V .



V
V





V .

V


V

Mud


V

V

V



V
V

V

V

V




V

Dust


V

V



t

V
V

V

V

V

•


V

Vectors


V

V




V

V












Odors


V

V





V
V



V








Noise




V




V
V
v

V










Acs-
thetics

V

V

V


V
V
V




,
V

V


V

Safety

V
V

V

V


V

V

V








V

Birds




V



















Litter




V




V





V








Fires




V








V

V








(continued)

-------
Table 10-2. Environmental Control Practices in Landfill Operations (cont.)
Practices

Chemical masking
agent
Workers supplied
with health and
safety equipment
Cover solid waste
daily
Water diverted away
from site
Construct low-
permeability liners
and leachate
collection systems
Construct low-
permeability final
cover system
Extermination
program
"'•••"-••™1111111111111™1111111111"'™1
Leachate






V

V

V



V



MI^^^^^^HMHHHIIIII
Spillage


















mi^mmmmmmmmm*m
Siltation &
Erosion







V









^^^^gHMWHHi^B
Mud

•






V









^^^^^•^MMMMMM
Dust



>/





*;



,




••••••••••^•MBM
Vectors






V







V


.V
•^••^•••••^•w
Odors

V

V


y
'i * •






V



•••M^^MMMHH
Noise


















^^^^^^MMIHHH
Aes-
thetics





V











^^^^^^^^^^^^^^MM
Safety



V


V











••MBWMMIMHHHMHi
Birds






V










V
•I^I^^^B^HBBBMBBBi
Utter






V











**•••••••••••••
Fires






V











•^•••••••••••••i

-------
 the  landfill, proper final grading, seeding, and maintenance of a final cover system help
 prevent long-term erosion and siltation problems.
 10.2.5.3   Mud
 Heavy rains and snowmelt during the spring can result in the production of mud.  In order to
 reduce the adverse impact that muddy conditions can pose on daily operations, access roads
 should be paved or graveled, and maintained on a regular basis.  An alternative to paved or
 gravel roadbeds is a surface composed of a mixture of materials of relatively large particle size
 (such as sand or gravel), or clay soils where vehicle traffic is heavy.

 Mud can be tracked onto public roadways by landfill equipment or collection vehicles and can
 result in significantly poor public relations for waste disposal facilities [6]. Ideally, an area for
 washing should be installed and operated near the gate to the facility in order to remove the
 mud from  transport vehicles. In some cases, landfill sites have specific areas that are used
 only during poor weather conditions and when conditions in other areas of the facility are
 muddy and would  make operation difficult.  Wet weather operation areas should be carefully
 planned and, if possible, located as close to the main gate as possible in order to reduce on-
 site  travel.
 10.2.5.4   Particulate Matter
 Airborne particulates  (e.g., dust) in  a landfill site are generated by  collection vehicles and
 heavy equipment moving over dry dirt roads or dry, dirty paved roadways and by the wind.
 Particulate emissions can also be generated during the discharge, placement, and compaction
 of dry waste materials or during the excavation and transport of dry soils. In order to reduce
 the amount of particulate generation, access roads should be graveled or paved.  In addition,
water or other environmentally-acceptable dust control chemicals can be applied to dusty or
dirty roadways on a continuous basis, or on the basis of need.  The relatively common practice
of applying waste oils to roads should be discontinued.  Excavating or moving soils when they
are damp will limit  the generation of particulate matter. Similarly, dry waste materials should
                                                                                  10-12

-------
 be slightly moistened prior to disposal.  Another means of reducing the total amount of dust
 generated from a particular facility is to revegetate completed areas as soon as possible.

 Especially in the case of the operation of landfills near populated areas, a water truck or trailer
 should be available, maintained, and used to moisten dirt roads and working areas as a dust
 control method.
 10.2.5.5   Vectors
 Flies, mosquitoes, and rodents may be present at landfill sites. These  and other vectors can
 be controlled by frequently placing an adequate quantity of compacted soil over the wastes.  It
 has been demonstrated that a daily cover consisting of 15 cm of compacted soil having some
 day content will prevent the emergence, accumulation, and breeding of flies.  However, even
 when daily or frequent covering of waste is practiced, a landfill operation should include  a
 regular inspection and control program for flies.  Mosquito control is  best accomplished by
 preventing the accumulation of stagnant water  anywhere on the site.   The accumulation of
 stagnant water can be prevented by proper grading, filling low spots,  and placing cover soil
 over waste materials.

 Whole  tires represent a  risk of  fire and breeding  areas  for  mosquitoes when  water
 accumulates in them.  Consequently, whole tires should not be allowed to be stored on the
 landfill premises.  Moreover, since whole tires tend to migrate to the surface of the fill, they
 should be cut or placed carefully as far from the surface of the fill as possible.

 Rats and mice may be brought into the site with the solid waste from time to time.  If habitat is
available in areas adjacent to, or in some neglected portion of, the site, extermination by the
local health department will be necessary.  Employees at the landfill should be trained  to
recognize burrows and other  signs of the  presence of  rats and  mice so that  appropriate
measures of control can be taken.
                                                                                 10-13

-------
 10.2.5.6   Odors
 There are several potential sources of odor at a landfill.  Odors  may be generated in the
 following situations:
 •     Odors generated by the refuse usually can be mitigated by rapidly covering the wastes
       and ensuring that the cover is maintained intact.
 •     Occasionally, loads of particularly malodorous materials may be delivered to the landfill.
       Deliveries of these materials should be scheduled such that sufficient manpower and
       equipment are available to immediately  cover the waste.  If separate handling is not
       possible, malodorous loads can be mixed or covered  with other wastes  in order to
       control the problem of odor emissions.  The use of lime or chemical masking agents
       also can  be  used to control  odors  in some  cases  and with various degrees of
       effectiveness. Effectiveness is governed by the properties of the offending material.
 10.2.5.7   Noise
 There are several sources of noise at landfills.  These sources include operating equipment
 and collection vehicles.  Typically, the noise is very similar to that generated by any heavy
 construction activity, and is limited primarily to the site and to the streets used to transport the
 solid waste to the site.  One of the majors generators of substantial noise is vehicle engines,
 especially engines that do not possess noise control systems (e.g., mufflers).  Engine noise is
 particularly significant while the engine is  under substantial load (e.g., while operating the
 hydraulic unloading equipment of a collection vehicle or while transiting a steep grade). Areas
wherein vehicular engines are under significant load should be located remotely from sensitive
noise receptors. In order to reduce the total number of individuals exposed to the noise, every
effort should be made to route traffic accessing the disposal site through the least populated
areas. In addition, the site can be isolated or surrounded by a buffer zone such that the noise
does not disturb anyone.  The installation of property designed and constructed barriers, such
as earthen berms, walls, and trees, can be effective methods of noise control.
                                                                                  10-14

-------
 10.2.5.8  Aesthetics
 In order to reduce environmental impacts and to make the landfill acceptable to the public, the
 site should  be designed to be as compatible with its surroundings as possible.  During  site
 preparation, it is important to leave as many trees as possible in order to form a visual barrier.
 Berms  can also be used to form visual barriers.  The  use of architectural effects  at  the
 entrance, confining disposal to designated areas, and the use of attractive landscaping  will
 assist in the development of an aesthetically pleasing operation.  Additionally, every attempt
 should be made to minimize the size  of the working face.  Control of dust generation by
 vehicular traffic and  disposal  equipment also minimizes the negative visual impact  of  the
 facility.
 10.2.5.9  Birds
 Birds, especially in landfills located in coastal areas, are attracted to landfills because of  the
 potential source of food.  Birds can pose a serious hazard to operating aircraft and create a
 nuisance to operating personnel  and neighbors.   In the United States,  the  criteria for  the
 classification of waste disposal facilities and  practices stipulate that a solid waste disposal
 facility should not be sited within 5 miles (or about 8 km) of an active airport. A number of
 devices have been used to control birds at solid waste disposal sites, some of these devices
 (noise  production, nylon strings, distress  calls,  or similar measures) can  provide some
 temporary control. However, the most effective control practice is rapid and complete covering
 of all solid waste.
 10.2.5.10 Litter
 One of the  more frequent complaints from residents living near solid waste disposal sites is
 blowing  litter outside the  boundaries  of the disposal  operation.   Blowing litter can be
 substantially reduced by:

•      discharging the waste at the toe (bottom) of the working face,

•      frequent and thorough cover of the face and completed portions of the cell,
                                                                                   10-15

-------
 •     application of water or damp waste to loads containing a high concentration of paper
       and dry dusty solid wastes, and

 •     installation and maintenance of portable or stationary fencing around the working face.
 Generally, despite the operator's best efforts and control measures, the accumulation of some
 litter is inevitable at a landfill site.  The installation of a fence around the site will help to contain
 litter and to keep it from reaching adjacent properties. Daily cleanups, particularly at the end of
 the working day, can  limit the quantity of litter that can reach adjacent properties and can
 optimize the collection of litter because, for a given quantity of litter, collection within a confined
 area is more efficient than collection over a wide area.
 10.2.5.11  Fires
 Waste disposal sites represent a risk of smoldering waste  or fires. The fuel for the reaction
 can be the solid organics contained in the wastes, the methane generated as a consequence
 of the landfill processes, or both. Three conditions must exist to support smoldering or burning
 of wastes:

 1.     a source of combustible material (i.e., carbon);

 2.     an oxidizer, usually the oxygen in the air entrapped with the buried wastes; and

 3.     sufficient heat to support the combustion and pyrolytic processes.

 Sources  of heat, among others, can be smoldering wastes delivered to the landfill or that
 caused by chemical reactions occurring in the fill.

 Burning  of waste at disposal sites in economically developing  countries can  be intentional
 (e.g., as  a method of  volume reduction) or unintentional.  Prevention and control of burning
wastes within open dumps  is difficult because no containment system has been designed into
the disposal sites. In this regard, the cell  structure and gas control system of a modem landfill,
                                                                                   10-16

-------
 and the practice of compacting the waste, overcome a serious shortcoming of the open dump.
 High levels of compaction reduce void space wherein oxygen can reside, thereby minimizing
 the availability of an oxidizing agent.
 Control of fires at landfills or open dumps requires similar practices.  Essentially, control is
 achieved by the occurrence of one of the following three circumstances: 1) the source of fuel is
 removed or consumed, 2) the oxidizer is removed or consumed, or 3) the source of the heat
 required for the reaction is removed. An in-depth discussion of the mechanics and control of
 fires in waste disposal facilities can be found in Reference 7.
 Uncontrolled ignition of combustible  materials  (open burning)  should not be permitted  at
 landfills.  The reasons for this recommendation include protection of worker and public health
                           : Ur\
 and safety, the adverse impactiof the practice on air quality, and the negative visual impact of
 the practice on the aesthetics of the operation.  Fires and burning wastes also can destroy
 landfill equipment and facilities, including gas collection piping and synthetic liners, if present.
 An awareness must be had of potential sources of fires  at landfills.   The sources include
 receipt of hot wastes,  sparks from vehicles,  equipment fire,  vandalism, and purposeful
 incineration for salvaging (e.g., removal  of insulation from  copper wire).   A good  security
 program, combined with alert spotters, can mitigate the occurrence of  the majority of fires at
 the disposal site.  Hot and highly flammable wastes should not be  mixed and should be
 directed to specific areas in the landfill and wetted or smothered and diluted with soil or water
 prior to disposal. All landfill vehicles should be equipped with fire extinguishers to limit damage
 resulting from equipment fires.
 In the event that piped water is not available, a water truck  or trailer equipped with a gasoline-
 powered pump should be on-hand.  Several techniques are available for dealing with fires.
 Burning or smoldering waste near the surface of the fill can be excavated and extinguished
with soil and/or water.  Deep fires can sometimes be smothered by placing damp soil on the
                                                                                 10-17

-------
 surface of the fill.  More commonly, however, deep fires will have to be thoroughly excavated
 and smothered at the surface.  Particularly large fires may have to be dealt with by qualified
 and experienced fire fighting personnel.
 When excavation  is used, care must be taken to minimize the potential for the occurrence of
 rapid combustion or explosion since methane gas may be present and excavating the wastes
 exposes them to oxygen (air).  Control of burning waste is one of the important functions of the
 cell structure of the sanitary landfill. The cell boundary (i.e., daily and intermediate soil cover)
 acts as a barrier to burning waste.
 In those locations where solid fuels such as coal or wood are used for domestic heating and
 cooking,  hot ash  disposed  with other domestic wastes represents a  risk of  fire when the
 wastes are delivered to the landfill.  In those locations,  monitoring (or inspection) of loads
 should be conducted for the  purpose of identifying any hot ash or  burning  or smoldering
 materials.  If such  loads are  identified,  they should be unloaded on a soil surface  and
 extinguished completely with soil or water prior to landfilling.
                              f      Y".
 10.2.6    Self-Haul
 Most disposal sites  allow the transportation and  discharge  of wastes by private individuals
 (self-hauler).  Typically, small vehicles  comprise a considerable portion of self-haul traffic.
 These users (either small contractors or  private  individuals), because of infrequent usage,
 typically are unfamiliar with practices at the site and, therefore, can damage their vehicles, can
 cause delays at the working face, and may cause accidents.

 Several options exist for managing self-haul vehicles.  Self-haul vehicles can be directed to
 specific areas of the working face away from the area used by large collection vehicles.
Alternatively, a small transfer system can be used within the disposal  site. Transfer systems
commonly used are large self-dumping trailers (which are located remotely from the working
                                                                                  10-18

-------
 face, but which are periodically towed to the working face when full), dump trucks, and roll-off
 containers. Normally, a platform is constructed to unload small volumes of waste into the large
 containers.

 The transfer point should be located inside the gate and adjacent to a well-maintained main
 roadway. This area should be located at a point where it can be watched by site personnel.  If
 utilization of the transfer station is frequent,  an employee may need to supervise and operate
 the facility on  a  continuous or frequent basis.   A resource recovery operation can also be
 added to the transfer station if supervision is available. A transfer station  represents potential
 problems, especially abuse by the users. Litter is a common problem and fires may take place
 in the container(s).  Nevertheless,  the  value of some type of transfer system is sometimes
 justifiable  in terms of controlling  the  costs  of maintaining  roadways,  simpler and  safer
 operations at the working face, and  good public relations.

 10.2.7    Salvage/Scavenging
 Scavenging or uncontrolled sorting  of raw wastes to recover materials that may be reusable is
 a common practice  in  most economically developing countries.   This practice is strictly
 prohibited at the working face of landfills in industrialized countries because of the high risk of
 injury and health-related hazard to the scavenger.  If  salvaging is allowed, it should be
 controlled and should be conducted away from the working face under sanitary conditions and
 under direct supervision of the operator  of the landfill.  Salvaging operations and storage must
 be confined to a specific area or facility so that they will not interfere with the landfill operation.
 Strict controls  must also be established  on the types of materials, storage, and  removal
 frequencies so that nuisance conditions do not develop.  Individuals working in a salvaging
 operation should be provided with uniforms, hard hats,  masks,  boots, and  basic sanitation
 services.

Additional discussion regarding  scavenging is presented in Chapter 15.
                                                                                  10-19

-------
 10.3  Specific Operational Procedures
 Three basic operational procedures apply to landfilling and their use depends on the method
 of landfilling. The three procedures are:
 1.     site preparation,
 2.     traffic flow and unloading, and
 3.     waste compaction and covering.
 The sequence and method of operating a landfill are dictated by  several factors that are
 specific to a site.  Some of the more important factors include physical site characteristics,
 types  of waste, and the rate  of receipt of solid waste.  There may be more than one
 satisfactory method for a given disposal site.
 As has been previously indicated, the two basic operational methods are trench and area. The
 primary difference between the two is that the trench operation employs a prepared excavation
 and, as such, confines the working face between the two sidewalls. The area method, on the
 other hand, does not use extensive surface preparation. The width of the working face is, in
 theory at least, unlimited. A common  approach of landfills is to use both methods at different
 locations or times.  For example, initial disposal operations may employ a trench design and,
 subsequently, the area method may be used on top of the completed trench cells.

 10.3.1    Site Preparation
Any excavation of soil during preparation of the site should follow a particular sequence such
that the soil that is removed can be used elsewhere on-site without stockpiling. This procedure
eliminates double handling of material. A model has been developed to provide assistance in
the planning of soil movement [8].  However, it is frequently necessary to stockpile a certain
amount of soil in order to take full advantage of the various types of soils. For instance, topsoil
                                                                                10-20

-------
 should  be stockpiled for use on roads, as daily, intermediate, and final cover, or for the
 construction of leachate collection systems or surface drainage systems.   Clay may be
 selectively excavated and used as liner material, dikes, interim and final cover, or, if necessary,
 used to supplement subgrades.
 Soil that is stockpiled  should be placed in appropriate areas,  compacted, and appropriately
 sloped  to keep it as dry as possible.   Soil should be stockpiled as close as practical to the
 location where it will be used.  Stockpiles should not be placed in areas where they will
 interfere with traffic or cover soil that might be needed for other functions, or will impede the
 function of drainage control systems.

 10.3.2    Traffic Flow and Unloading
 The  general procedure  for managing the receipt of solid waste  at the gate is discussed
 elsewhere.  The procedure is applicable to both the trench and area  methods.
 the spreading, compacting,  and covering of waste can be facilitated by controlling the position
 of the collection vehicles while unloading. If the collection vehicles are directed over previously
 filled areas, .the areas should be well-compacted.  When possible, demolition debris and other
 dense rubble should be placed to take advantage of the drainage plan.  Roads should be
 designed and built such that they do not interfere with stockpiling or handling of the soil.
 The working face  should be  as  narrow  as possible without unduly  constraining normal
 operations.   To facilitate this, an operator (spotter) should  be at  the face of the fill during
 operating  hours using  a whistle,  a bullhorn,  or flags to direct  incoming  vehicles  to the
 appropriate sections of the working face.  Barricades and markers can be used  to delineate
 the area that is  used on a given day.
 It is preferable  to keep the unloading area at the toe of the working face. This is because
spreading and compaction are easier and generally more effective when performed from the
                                                                                  10-21

-------
 bottom toward the top of the working face (see Figure 10-2). If the unloading of waste occurs
 at the top of the working  face, care must be taken to prevent the waste from simply being
 pushed  over  a steep working face  without the application of adequate passes by the
 compactor (a common practice in many economically developing countries).  Unloading waste
 at the toe generally overcomes the risk of this poor operating practice and reduces blowing
 litter. The unloading area should be kept clean, dry, and level to prevent vehicles from being
 damaged, tipped, or mired in mud. At small sites, it may be necessary to provide an unloading
 area that is wider than the working face. At large sites, or at sites that process large quantities
 of wastes in relatively short timespans, a portion of the unloading area should be set aside for
 unloading trucks manually. If the face of the fill is not sufficiently wide to allow for this process,
 manually-operated vehicles may be routed for unloading to the top of the working face.

 10.3.3    Waste Compaction and Covering
 Spreading and compaction operations should be aimed at maintaining proper cell density,
 height, slope, and width throughout the day.

 the compacted density of the solid waste primarily depends  upon four main variables.   The
 degree of compaction is a function of: 1) the thickness of the  layers, 2) the weight (or applied
 pressure) of the equipment used to compact the waste, 3) the slope of the working face, and
 4) the number  of passes  made by equipment   The slope of the working  face should not
 exceed 1:4; 1:5 is a general practice.  Usually 4 to 6 passes with heavy (i.e., greater than
 about 20,000 kg) wheeled or tracked equipment will provide a high degree of compaction.
 Although passes in excess of 4 to 6 times do result in higher compaction, the return for the
 effort substantially diminishes beyond 6 passes.  A trained and experienced operator knows
when additional passes will result in greater compaction.  In order to prevent soft spots in the
fill area (i.e., areas susceptible to settling when a load is applied), the wastes should be mixed
(e.g., a load of plastics or tree limbs  should be mixed with mixed domestic wastes), and
                                                                                 10-22

-------
      STEP 1  Unload solid
              waste at toe of slope
      STEP 2
              Spread in thin layers
              (approximately 60 cm)
      STEP 3 Compact by running tractor
              over waste layer 2 to 5 times
                    Figure 10-2. Unloading and Compacting Process

excessively wet loads should be separated and mixed with dry materials before and during
spreading. The compaction sequence is demonstrated in Figure 10-2.
The final height of lifts usually is determined by the grade plan for the facility, soil usage, and
operational limitations.  In extremely deep fills with a large number of lifts, the height of the lift
may be limited by the equipment. For instance, a lift may be limited to the maximum height at
which a scraper can provide complete coverage with soil with one pass.  Typical heights for
lifts range between 2 to 4 m.
                                                                                10-23

-------
The relation between density and the number of passes, the thickness of the waste layer, and
weight of compacting equipment are illustrated in Figures 10-3,10-4, and 10-5, respectively.

The slope of a cell should not exceed 15°, or about 1:4 (vertical to  horizontal).  The slope
should be established by properly placing  and  compacting the initial loads, and  maintained
constantly throughout the day.  The more horizontal the working face, the greater the degree
of compaction of the waste and of control of the compaction equipment, all other conditions
being constant.   However, if the working face is too near to horizontal, the potential  of
problems increases with respect to good drainage and to control of the larger area  of exposed
wastes.  Also, the requirements for cover soil increase  as the slope of the  working face
decreases.
              t
              
-------
             5         10         15        20        25

                      Layer Thickness (cm)
     Figure 10-4. Relationship Between Thickness of
 Layer of Waste and Relative Average Compacted Density
             10          20          30
                      Vehicle Weight (Mg)
40
Figure 10-5. Machine Weight vs. Relative In-Place Density
                                                                10-25

-------
 The stockpiling of soil and the method of application of the soil should be earned out such that
 the cover will not be littered with waste.  This situation can be prevented by depositing the soil
 at the top of the cell or adjacent to the face.  At the time that the cover is applied, the soil
 spreading equipment should travel over only the soil.  The spreading equipment should not
 travel from the waste onto fresh  soil because this practice tends to draw waste on top of the
 cover material. The tires for the various types of equipment should be cleaned before applying
 or compacting soil.
 In industrialized countries, scrapers are the more frequently used types  of equipment for the
 application of cover material. Scrapers reduce the amount of double handling.  Unfortunately,
 they  are expensive pieces of equipment, and  the tires may be damaged  by the waste
 materials.  Draglines can also be used for the  application of cover material.  The use of
 draglines,  however, requires additional grading and compacting of soil.  Regardless of the
 placement method, the cover should be compacted and smoothed. Bulldozers can also apply
 cover, although if equipped with only a blade, they may require another piece of equipment to
 deliver the cover material to near the working face.  Typically, two passes using appropriate
 equipment will provide sufficient compaction for daily cover soil.

 The main purposes for applying daily cover are to improve the appearance of the site and to
 control  vectors,  litter, odor, water  infiltration, and, to  some extent,  fire.   Under ideal
 circumstances, the solid waste should be spread and compacted on the working face as soon
 as possible after delivery and covered with daily cover at the conclusion of the day's activities.
 Compaction of the waste  levels the  site  and facilitates  both  covering  and  subsequent
 operations by providing a  smooth surface.  Typically, a minimum compacted thickness of 15
 cm of daily cover soil is sufficient to accomplish the objectives. The thickness may exceed 15
 cm if a greater depth is required to cover all of the waste.  Cover should be applied to the top
and side slopes as cell construction progresses. The side slope of the active cell (i.e., the
exposed surface of waste perpendicular to the working face) should be sloped and covered
                                                                                 10-26

-------
with cover material as the working face advances. The procedure of compaction and covering
of the side slope should be similar to that followed on the working face.  These  operating
procedures serve to control blowing litter. The working face and adjacent side slope should be
covered at the end of the working day [9].

Intermediate soil cover has the same general function as daily cover. The intermediate cover,
however, remains exposed to the elements for a longer period of time.  The intermediate cover
may  also serve as  a temporary surface for traffic movement.   The minimum suggested
compacted depth for an intermediate cover is 30 cm.  This cover should be placed as soon as
possible on the lift surface, but kept a sufficient distance away from daily activity to prevent
littering from equipment moving over it.
Completed areas should be covered with the final layer of cover as  soon as possible,  as
described in  Subsection 8.7.  The  depth and type of soil to be used and the  compaction
requirements must be specified in the facility design and operation plan. All but the upper few
inches should be compacted in order to reduce the soil permeability. Topsoil can be added to
the surface of the final cover.  Seeding,  mulching, fertilizing, and pH adjustment  should
immediately follow final covering. A U.S. EPA publication  provides some useful information on
standard procedures for planting vegetation on final covers [10].  The vegetation should be
appropriate for the local soils and climate condition.  Soil used as final cover should not be
applied when it is too wet or  frozen. A certain amount of soil should be  saved after site
completion to facilitate any grading that may be required to maintain  grades to specification.
Completion should be phased such that once the final cover is applied,  no additional traffic will
be permitted to traverse the completed area. A detailed discussion on covers is presented in
Subsection 8.7.
                                                                                10-27

-------
 10.3.4    Area Method
 The area method typically is used in natural depressions, in prepared areas, or on top of filled
     z;:  -
 trench cells. The subgrade may consist of either natural soil, a prepared surface using liners,
 or compacted soil or soil supplements. The use of either of these materials  depends upon
 local regulations and design preferences.  A typical area fill operation is shown in Figure 8-2.
 An area fill requires imported soil, from on or off the site, for liners and covers.
 The primary objective in preparing a site for an area fill  is to utilize most of the available soil
 that meets  the design requirements.   At the same  time, site preparation should keep
 disturbance  of  natural  soil and vegetation to a minimum.  In  order to accomplish these
                                                     <
 objectives, it is necessary to conduct a comprehensive inventory of the amount and type(s) of
 soil available.

 10.3.5    Trench Method
 The trench method  is most applicable on flat or gently rolling ground  with deep soils.  The
 widths and depths of the trenches can vary substantially from site to  site.  A typical trench
 operation  is illustrated  in Figure 8-1.  .Trench operations  usually result in  surplus  soil and
 provide lateral confinement at the  operating face.   Trench fills  may require more land and
 equipment than area fills, other conditions being similar.  In addition, trench operations may
 need extensive soil stockpiling and handling.

 Generally, the depth and width of the trench are specified in the design and operating plans.
 The excavation of the first trench, and even portions of later trenches, may require stockpiling
 of large quantities of soil. The stockpiling must be conducted such that it will allow the soil to
 be available for use as liner and/or cover material such that other landfill operations are not
 impeded.

As previously indicated, the size of unexcavated areas  between trenches depends upon the
depth of the trench and the characteristics of the soil. In general, the more cohesive the soil
                                                                                   10-28

-------
the less area that will be required between the trenches.  On the other hand, the distance
between adjacent trenches increases as the depth of the trench increases.
The amount of soil handling  and stockpiling can  be optimized  by following  either of two
approaches. The first approach is called the phased fill and covering.  This approach uses soil
from a trench being excavated to provide cover for an adjacent trench that is in the process of
being filled.  Soil from the first trench must be stockpiled.  The second approach is known as
the progressive trench.  The progressive trench method uses soil excavated from one end of
the trench as cover material for waste deposited at the other end of the same trench.
The working face in trench operations usually is more sharply defined than in area operations.
In the  trench  method,  waste  is discharged within the  trench.   Waste should never be
discharged from the lip of the trench because of the risk of injury to operating personnel and to
users of the site.
In the trench operations, a ramp leading to the base of the trench is built and maintained at a
grade appropriate for vehicular traffic. Contingency plans should be designed and implement-
ed during wet weather or when other situations make the ramp hazardous or difficult to use.
The walls of the trench help to control the width of the face and size of the cell.  On the other
hand, the walls of the trench can interfere with compaction if the side slope is too steep for the
wheels or tracks to reach the edge of the waste against the sidewall, and still maintain blade
clearance.
Narrow trenches may have a rapid buildup of waste during  peak  periods of delivery.  Under
this condition, adequate  compaction may not be possible if all of the waste is discharged at the
face.  In order to prevent this situation, it is best to, at least,  loosely compact the waste in the
bottom of the trench, and spread and compact it thoroughly as time permits.
                                                                                10-29

-------
 When an area fill is placed on top of a completed trench fill, the operation should be phased
 such that the area fill is commenced as soon as possible after the trench fill.  Sufficient soil for
 use as cover material should be made available so that area lifts on top of trenches will have
 adequate cover.

 10.4   Performance Monitoring
 It is important that the landfill manager have the ability to assess whether or not the landfill is
 meeting its goals.  To that end, methods should be established for evaluating the facility's
 performance. There are many aspects of performance monitoring, ranging from the technical
 to the non-technical. The major items of landfill performance that can be readily measured or
 tracked are:

 •      waste quantities,
 •      filling rate,

 •      cover material usage,

 •      leachate production and control,

 •     gas collection and control, and

 •     worker safety.

 Closely related to performance monitoring is  environmental monitoring.    Environmental
 monitoring is covered in another section of this chapter.

 10.4.1    Waste Quantities
All solid waste entering the site should be weighed and the weights recorded, if at all possible.
In particular, large landfills should have weigh scales. Different types of waste (e.g., municipal
                                                                                  10-30

-------
solid waste and industrial waste) should be weighed and recorded separately. Depending on
the management structure for the landfill authority  and its service area,  it may also be
necessary to weigh and record refuse loads according to origin.  The latter type of information
may be especially useful to solid waste management planners and might also be necessary for
cost accounting and  billing purposes. Weight data should be meticulously recorded and kept
as part of the landfill operating record. To ensure validity of the data, weigh scales should be
calibrated at the initial opening of the landfill and at least once every six months thereafter.

In some locations, the landfills may either be too small to warrant the installation of scales, or
the municipality may  not have the resources to install one. In such cases, the volume of refuse
of each truckload (by type of waste) should be recorded as accurately as possible.  This can
be done by measuring the length, width, and height of the load and then computing the volume
as follows:

       Volume (m3) = Length (m) x Width (m) x Height (m).
In some cases, standard load sizes of incoming vehicles will be known.  Since some of the
waste may be compacted in the truck,  it will be important to account for such differences in
recording the load sizes. The most effective way to account for waste density variations is to
convert air measured volumes to weights.   Once the density of the waste  is known or
estimated, the mathematical conversion is simple:

       Weight (Mg) = Volume (m3) x Density (Mg/m3).

Density estimates  can be developed from past  experience, from limited test  weighings of
representative loads  of waste delivered to the facility,  and from  information obtained from the
manufacturers of compaction vehicles.  Test weighings can be conducted  with the use of
portable scales brought to the site.
                                                                                10-31

-------
 As discussed in Chapter 4, the densities of solid waste vary greatly with respect to level of
 economic development of the country and as a function of waste type, source, and moisture
 content   Since density  values  are of utmost importance in properly  managing  landfill
 operations and differ considerably from location to location, it is important that waste density
 information be determined for local conditions.

 10.4.2    Filling Rate
 The rate at which a landfill is filled has a direct bearing on the lifespan of the facility.  For
 example, if the filling rate can be reduced or moderated through good management, the landfill
 will have a longer service life for a given fixed capacity (volume). The filling rate is a function
 of the rate of waste disposed and of cover material used. The most reliable way to determine
 filling  rate is to conduct periodic land or aerial surveys of the filled area and,  using that
 information, calculate the volume, or "air space," consumed between the two survey dates.  At
 large landfills, it may be practical to obtain yearly surveys of the landfill surface  by digital aerial
 photogrammetry.   In  this way,  annual  volumes  can be determined  by  computerized
 calculations using the digitized elevation data from successive mappings.   Depending on the
 use of the survey data  and the length of time between surveys, settlement of the fill may need
 to be considered when interpreting the results and when applying them to future estimations.

 A less reliable, but still  useful, means of estimating filling rate is to convert waste quantity data
 to volumetric estimates of the in-place compacted waste. The volume of daily cover material
 used  in the landfilling  operation must be added to the  estimated volume  of  in-place waste.
 Using  waste  quantity data  requires  that reasonably accurate values of the compacted waste
 density be known and that compaction procedures be maintained as constantly as practical.

 Once the volumetric filling rate is established, the rate can be correlated with weigh scale data
 so that landfill capacity can be expressed in terms of either weight (Mg) or volume (m3) of solid
waste.
                                                                                  10-32

-------
Regardless of the method selected for estimating the filling rate, a knowledge of the rate is
essential to'predicting the remaining  life of an active  landfill.   Knowledge of the  facility's
remaining  capacity will be of value not only to the landfill manager, but also to others
responsible for solid waste management planning.

 10.4.3    Cover Material Usage
A knowledge of the rate of usage of daily and intermediate cover material is important because
the material occupies capacity (volume) in the landfill that otherwise would be available for
waste disposal.  Thus, soil cover has two costs: the direct cost of the cover material  and the
indirect cost of lost capacity to dispose of the waste.  One important goal of filling operations
should be  to utilize the minimum ratio of cover material-to-waste that is consistent with good
landfilling practices.  Since the minimum recommended  depth of daily soil cover is about 15
cm,  normally the only way to decrease the cover material-to-waste ratio is to increase the
depth of compacted waste before it is covered. This manner of operation may or may not be
practical, depending on the particular situation.

By monitoring usage of cover material in relation to incoming quantities of waste or compacted
fill quantities, the landfill manager can look for trends in cover requirements and for  possible
opportunities to reduce the cover to soil usage.  To determine  usage of cover material, the
operator can use a count of vehicle loads of cover material and  their volume or measure
quantities of cover material removed from dedicated borrow areas.  Counting loads of known
volume may be the most practical  method  of estimation for smaller operations.  Measuring
volumes removed from borrow areas can be done either by load counts or by land surveys
before and after excavation.

10.4.4    Leachate
In any landfill that has leachate collection facilities, the quantity of leachate should be  routinely
measured and recorded.  Leachate quantities can be measured in either of two ways: taking
                                                                                10-33

-------
 readings of liquid levels in leachate storage tanks or impoundments, or taking readings from
 leachate pumps or discharge lines equipped with totalizing flow meters.

 Leachate quantities should be recorded and analyzed for trends or significant variations over
 time.  Attempts should be made to correlate changes in leachate quantity with changes in
 precipitation.  Variations  not related to precipitation effects may be traceable to operational
 changes at the landfill. A comparison of actual rate of leachate generation with the original
 design estimates is also instructive.   If actual rates exceed the estimates  by a  substantial
 margin, an operational problem  may  be indicated as  the  reason  for excessive  leachate
 generation, or excedences could indicate that the facilities for collecting, transporting,  or
 treating the leachate are undersized.

 10.4.5    Landfill Gas
 Where partial or complete final covers have been installed, the  landfill surface should be
 checked periodically for adverse signs attributable to landfill gas.  These signs may include
 indication of stress to cover vegetation, strong odors, or visible breaches in the cover system
 where vapors are being emitted or where smoke or burning flames of gas are observed.  In the
          v
 case of landfill covers  constructed with geomembrane  liners,  excessive buildup of gas
 pressure below the liner may actually lift the cover system and create large bubbles in the liner.

Any of the signs described in the preceding paragraph would indicate that additional measures
are needed to contain, collect, or vent the gas.  In passive systems, the addition of vents at
identified trouble spots may correct the problem.  In active systems, unwanted emissions or
buildup of gas may be controlled by increasing the vacuum on existing extraction wells or
vents, or by installing additional wells or vents in problem areas.
                                                                                 10-34

-------
 10.4.6    Worker Safety
 The human element of landfill operations is the single most important consideration in landfill
 performance. Worker safety should be emphasized in all aspects of landfill operations through
 training of the workforce and by monitoring of the worksite for unsafe practices.  Health and
 safety training and monitoring of health and safety programs is a specialized area of practice
 that should be conducted by qualified and experienced professionals.

 At landfill sites where safety is given a high priority, likely benefits are high workforce morale
 and a high level of operational efficiency. A landfill that compiles a good safety record usually
 is a well-run operation. Conversely, a landfill with a poor safety record probably suffers from
 other operational problems  as well.  For these reasons, it is important that worker safety be
 tracked  for  the  duration of  operations.   Perhaps the  most useful measures of safety
 performance are the numbers of lost-time injuries and lost-time hours.  Also, in the United
 States, it is a common practice to post prominent signs at worksites reading, "We have worked
 XX.XXX hours without a lost-time injury," as a safety reminder and as  an incentive to
 employees to maintain safe working habits.

 10.5  Environmental Monitoring
 Environmental monitoring refers to  periodic inspections and  testing performed to assess the
 impacts of the landfill on its surrounding environment.  Environmental monitoring for landfills is
 conveniently divided into the following four categories:

 1.     erosion and sedimentation,

2.     groundwater quality,

3.     surface water quality, and

4.     air quality and gas migration.
                                                                                  10-35

-------
 Some monitoring activities encompass more than one of the above categories. For example,
 examination of the landfill cover for seeps of leachate applies to both Items 2 and 3 above.

 10.5.1    Erosion and Sedimentation
 At any time during the life of the landfill, large areas of disturbed land likely will be exposed to
 the elements.  Thus, the potential exists for substantial problems associated with erosion and
 sediment deposition if proper control measures are not applied. Even after closure, erosion
 and sedimentation control will be a long-term maintenance requirement.
 Environmental  monitoring should include  periodic  inspection of the  landfill surface and
 drainage systems for indications of excessive erosion or sediment deposition.  Sediment that
 has become deposited in channels should be removed promptly.   Downstream sediment
 basins or traps will need to be cleaned out from time to time to maintain their designed level of
 performance.  Natural waterways that receive runoff from the landfill site should be monitored
 frequently and after each major storm event for any signs of sediment deposition from the
 landfill.   Measures to restore affected water bodies or wetlands to their natural conditions
 should be undertaken as appropriate to the situation.

 10.5.2    Groundwater Quality
 Groundwater quality monitoring serves two purposes: 1) to demonstrate that the landfill is not
 causing  significant  degradation  of  groundwater,  or 2) if groundwater  quality  has  been
 degraded,  to  evaluate the character,  magnitude,  and  extent  of contamination of the
 groundwater resource [11,12]. Groundwater quality monitoring is particularly necessary when
 the location of the landfill is within 1,500 to 3,000 m horizontally of any groundwater source
 downgradient that is a potable water source for human consumption or is within 10 to 20 m
vertically of such a source.
                                                                                10-36

-------
 Normally,  groundwater monitoring wells are installed at a  landfill site  at the time  of
 hydrogeologic evaluations.  Additional wells may be drilled at the time of landfill construction or
 during the active life of the facility. Wells should be installed upgradient (background water
 quality) and downgradient from the  landfill.   The  wells  may  be constructed within the
 overburden or extend down  into  bedrock (Figure 10-6).   They may also  be screened  at
 different depths, depending on the stratigraphy.  The type, number, placement, and depth  of
 monitoring wells will depend on the particular geology and the size of the site, and should be
 established as part of an overall groundwater monitoring plan  developed by  a  qualified
 professional [13].
 Groundwater quality sampling and testing should be performed  at intervals throughout the
 year.  Sampling times should be adjusted so as to account for possible variations in water
 quality  related to seasonal  fluctuations in  the  water table.  The following water  quality
 parameters are common  indicators of possible contamination  by  landfill  leachate.  It  is
 recommended that groundwater samples be collected and analyzed for these constituents  at
 least twice per year.
 •   pH*                                     •   manganese
 •   specific conductance*                     •   nitrate/nitrite nitrogen
 •   alkalinity                                •   total Kjeldahl nitrogen
 •   biological oxygen demand                 •   iron
 •   chemical oxygen demand                  •   sodium
 •   chloride                                 •   sulfate
 * measurements by portable field instruments

 Analyses for the following parameters are more costly to perform but should be considered for
 inclusion in the groundwater testing program at less frequent intervals as circumstances allow:
 •   arsenic                                  •   lead
•   barium                                  •   selenium
•   cadmium                                •   total phenols
•   chromium                                •   volatile organic compounds
•   mercury
                                                                                 10-37

-------
                                                      Protective casing with
                                                      locking mechanism
                                                      Vented cap
                                                      Drain hole
                                                       Cement plug to set
                                                       protective casing
                                                Annulus backfilled with
                                                cuttings or grouted
                                                       Bentonite seal > 60 cm thick
                                               y Filter pack placed in annulus
                                                 to height > 60 cm above screen
                                               Cap on bottom
                                               of well screen
                Figure 10-6. Example of a Groundwater Monitoring Well

A more comprehensive testing program would be indicated for landfills receiving highly toxic
wastes  in low quantities or receiving substantial quantities of hazardous wastes.  Analytical
parameters should be  selected on the basis of the chemical characteristics of the accepted
wastes.
                                                                                 10-38

-------
 10.5.3    Surface Water Quality
 Downgradient surface waters should routinely be inspected for visible signs of environmental
 degradation.  In addition to sediment deposition,  as previously discussed, evidence  of
 degradation may include such obvious signs as dead or  unhealthy flora and fauna, visible
 leachate pools or streams,  unnatural water clarity or color, and unusual odors.  Besides
 making frequent visual  inspections,  the surface waters  should  be  checked whenever
 groundwater  monitoring  wells  are  sampled.   During  those  sampling  rounds,  field
 measurements at representative surface  water locations should be taken for the following
 parameters:
 •   pH                                     •  biological oxygen demand
 •   specific conductance                     •  total Kjeldahl nitrogen
 Surface water samples should be collected from any location that shows obvious degradation
 for which the landfill is believed to be the probable cause.  Samples should be collected both
 upstream and downstream of suspected sources of contamination. If a tributary stream is a
 suspected source, it too should be sampled.
 To a large degree; the sampling points and analytical parameters appropriate to a  specific
                                            •"!,
 situation will be based on past experience, professional judgement, and common sense.  For
 example, contaminants known to be present in groundwater may be contributing to surface
 water degradation near the site.  In the absence of any specific data, the first tier of water
 quality parameters  listed in  Section  10.5.2.  may  serve as  a reasonable starting point for
 analyzing surface water samples.  Based on those findings and on the results of concurrent
 groundwater quality testing,  the list of analytical parameters might be expanded to include
those in the second tier. Over time, it may be possible to effectively monitor water quality by
selecting a smaller number of "indicator" parameters for most samplings as a way to minimize
analytical costs.
                                                                                10-39

-------
 10.5.4   Air Quality and Gas Migration
 Since most economically  developing  countries lack specific  air quality  regulations  and
 allowable emissions levels for land disposal facilities, the measurement of air quality at landfills
 would not be a normal practice.  However, two aspects of air quality and emissions, namely,
 odors and gas (methane) migration, are issues relevant  to all landfill sites regardless of the
 state of regulatory development, and require monitoring as part of modem landfill practice. For
 the most part, odors should be monitored through the awareness of landfill workers and by
 attending to the complaints of neighboring property owners and other populations.  If odors
 should become a continuous problem for the affected parties, then the problem should be
 resolved by implementation of appropriate adjustments to landfill operating methods.  (In the
 extreme case, odors may be controllable only by means of an  active gas collection  and
 treatment system.)

 Landfill gas migration, on the other hand, requires that specific procedures be established for
 its assessment.  The  need for  gas  migration monitoring derives from its flammability and
 explosive potential  (see Chapter 14 for further discussion of landfill  gas).  The  purpose of
 monitoring gas migration is to ensure that landfill gas does not migrate to and accumulate in
 on-site structures or to off-site locations in concentrations that  are  a hazard to  humans or
 property.  In the United States, federal rules have been established that require  landfill gas
 concentrations to be no greater than the following limits:

 •      100% of the lower explosive limit (LEL) at the property boundary of the landfill facility,
       and

•      25% of the LEL in any structure within the landfill facility.

These limits also serve as functional guidelines for an economically developing country.  The
LEL is equivalent to a concentration of 5% methane in air, and the 5% figure is used in the two
                                                                                 10-40

-------
gas migration requirements  listed above.   LEL  is measured by means of a field-portable
combustible gas indicator.

To monitor and assess off-site gas migration, monitoring probes (Figure  10-7) usually are
installed along the site boundary at various intervals.  Spacing between probes will depend on
the particular circumstances of the site. Where migration is of substantial concern to abutting
properties, a maximum distance of 100 m between probes would be a reasonable guideline in
most cases.  Along site boundaries where there is little potential or negligible risk of gas
migration, probes may be omitted. Gas migration probes typically are constructed to a depth
that is  equal to the highest  water table elevation or to the bottom  elevation of the landfill,
whichever is higher, or to the most permeable soils above the water table.
Structures on or near the landfill are vulnerable to the accumulation  of landfill gas. Routine
monitoring for landfill gas is necessary to ascertain that gas is not seeping  into these locations.
The operator should bear in  mind that landfill gas tends to follow the path of least resistance
underground.   Experience  and  measurements  have  shown  that  landfill gas  can travel
considerable distances from the source.  In addition to the obvious landfill structures that may
be affected, the following can serve as  either conduits or collection points for landfill gas:

•      gravel-filled or stone-filled underground trenches (e.g., subdrains);

•      underground pipelines or utility lines;

•      underground manholes, vaults, or basement structures; and

•      highly permeable soil strata.

Before entering  any underground or confined space in the vicinity of the landfill, the space
should be tested for gas concentration  with a combustible gas indicator.   Human entry should
be forbidden at any level above 10% of the LEL.
                                                                                  10-41

-------
                                             Protective cover
                   Natural ground
      flexible tubing
      Compacted soil backfill
      PVC pipe
     Grout or clay plug
     Perforated PVC pipe

      Natural ground

y! — Washed pea gravel
         Figure 10-7. Typical Single-Screen Gas Monitoring Probe (not to scale)

With regard to both  landfill structures and monitoring probes, monitoring for gas  should be
                                           -"! •
performed on a regular schedule -for example, once every three months. Gas readings (%
LEL) are taken by inserting the instrument sensor into the monitor probe casing.  At  structures,
readings should be taken in below-grade and above-grade interior spaces, around the outside
of foundations  at ground level,  and in any cracks or holes in  the foundations or floors.
Measurements at off-site structures close to the landfill are also recommended, especially if
they are inhabited or have basements,  where the gas accumulates preferentially.  Off-site
measurements of gas concentrations may also be prudent  if stress or damage to  vegetation
off-site is visually apparent.   Thus, off-site visual reconnaissance should be used  as a
monitoring  tool.   Any  readings  of  gas concentrations  that exceed  the above-referenced
                                                                                10-42

-------
guidelines indicate the need for increased vigilance and monitoring and possible corrective

actions, or even evacuation of the building(s).


References

1.     Keller,  E.A., Environmental  Geology, Second Edition,  Merrill Publishing Company,
       1979.
2.     Garland, G.A. and D.C. Mosher, "Leachate Effects of Improper Land Disposal," Waste
       Age, March 1975.
3.     Shuckrow, A.J., A.P. Pajak, and C.J.  Touhill,  Management of Hazardous  Waste
       Leachate,  prepared  for the  Municipal Environment Research Laboratory, Office of
       Research  and Development,  U.S.  EPA, Cincinnati, Ohio,  SW-871 (NTIS  PB81-
       189359), September 1980.
4.     Lu,  J.  C.S., B. Eichenberger,  and  R.J. Steams, Production and  Management of
       Leachate from Municipal Landfills:  Summary and Assessment,  EPA-600/2-84-092
       (NTIS PB84-187913), May 1984.
5.     Bass, J.M., Avoiding Failure of Leachate Collection Systems at Hazardous  Waste
       Landfills, EPA-600/D-84/210 (NTIS PB84-235100), August 1984.
6.     Noble,  G.,  Sanitary  Landfill Design Handbook, Technomic Publishing Company,
       Westport, Connecticut, 1976.
7.     Steams, R.P. and G.S. Petoyan, "Identifying and Controlling Landfill Fires,"  Waste
       Management & Research, 2:303-309,1984.
8.     Conrad, R.B. and  E.K. Hoffman, "Transportation Model Applied to  Landfill Design,"
       Journal Environ. Eng. Div. ASCE, June 1974.
9.     U.S.  Environmental Protection Agency, Design,  Operation, and Closure  of Municipal
       Solid Waste Landfills, Seminar Publication, Office of  Research  and Development,
       Washington, DC, EPA/625/R-94/008,  September 1994.
10.    Gilman, E.F.,  F.B. Flower, and L.A. Leone, Standardized Procedures  for Planting
       Vegetation on Completed Sanitary Landfills, U.S.  EPA, Cincinnati, Ohio, EPA-600/2-83-
       055 (NTIS PB83-241018), 1983.
11.    Puls,  R.W. and M.J. Barcelona, "Ground Water Sampling for Metals Analysis," USEPA
       Superfund Ground Water Issue, EPA/504/4-89/001 (NTIS PB91-133249), 1989.
12.    U.S. Environmental Protection Agency, Ground-Water Monitoring and Corrective Action
       (Subpart E) - Criteria for Municipal Solid Waste Landfills (40 CFR Part 258) - Subtitle
       D of the Resource Recovery and Conservation Act, July 1988, Office of Solid Waste
                                                                              10-43

-------
      and  Emergency  Response,  Washington, DC,  EPA/530-SW-88-043 (NTIS  PB88-
      242490), 1988.
13.    U.S.  Environmental Protection Agency, "Handbook of Suggested Practices for the
      Design and Installation of Ground-Water Monitoring Wells," EPA-600/4-89-034 (NTIS
      PB90-159807); Office of Research and Development, Washington, DC, 1989.
                                                                            10-44

-------
 Chapter 11
 Landfill Processes

 11.1  Introduction
 In this chapter are discussed the key processes that take place within the volume of the landfill
 that contains solid wastes. The processes that take place within the landfill environment can
 be characterized  by considering three general  aspects:  1)the quantity,  composition, and
 characteristics of the disposed wastes; 2) fill design and  operation; and 3) the phenomena
 associated  with physical, chemical, and  biological processes that occur within the buried
 wastes.  The performance (i.e., consequences) of operating and maintaining the fill are the
 manifestations of the aforementioned processes.
                            3UC-
 The three aspects are closely interrelated with respect to their impacts on the completed fill.
 For example,  the quantity  and  composition of the  wastes determine the  quantities and
 characteristics of products associated with physical, chemical, and biological processes, which
 in turn are  influenced by fill  design and conduct of the fill operation.  Moreover, they also
 determine the extent and the course of the physical and biochemical processes. Because of
 this interrelationship, all three are discussed under the single heading, "Key Processes."

 One manifestation of the result of these processes in the  landfill is the decomposition of the
 wastes.  Decomposition is the breakdown of a material into simpler,  or less complex, chemical
 units.  Physical breakdown of material also occurs in the landfill

 The division of the  key processes  into physical,  biological,  and chemical categories  is
 somewhat arbitrary,  particularly since the processes themselves do not lend themselves to
 exact definitions and because synergies among the processes occur in the landfill. However,
the division allows some  degree of organization of this complex topic that could not otherwise
be achieved if the processes were simply listed in an arbitrary order and described.
                                                                                  11-1

-------
 11.2  Key Processes
 After waste is placed in a landfill, a number of processes occur. The processes, to one degree
 or another, are influenced by certain external conditions along the boundary of the fill.  The
 external conditions include, but are not limited to, such factors as amount and rate of rainfall
 and the permeability of the cover/waste interface to water penetration.  For practical purposes,
 three processes dominate within a landfill. These processes can be described generically as
 physical, chemical, and biological. The processes do not act independently of one another,
 and during the life of a landfill the relative domination of each process may vary as a function
 of time and  as  a function of  position in the fill.  Of the three generic types of processes
 occurring  in a landfill,  the  biological  processes  are the most significant.   However, the
 biological processes are strongly influenced by the physical and chemical processes.  At the
                              *
 same  time,  the  physical and chemical  processes also  are influential on  the biological
 processes.

 11.2.1    Physical
 Generally,  the most  significant physical  processes occurring in  the fill are: compression
 (compaction), dissolution, sorption, and particle size  reduction.  In the occurrence of a strictly
 physical process, no change in chemical composition occurs.

 Compression and settlement of the fill are closely related processes;  thus, they are described
jointly. In like manner, dissolution and transport are closely associated mechanisms, but not to
the same degree as compression and settlement.  All areas within the fill experience the four
processes.

Compression of waste at the disposal site is an ongoing process that begins with compaction
(and size reduction) of the waste by machinery used  to crush (i.e., compact) the wastes during
the daily fill activities and continues after the wastes are  in place. The continuing compression
is a consequence of the degradation of the wastes and is a result  of the force exerted by the
                                                                                  11-2

-------
weight of the overlying burden of wastes and the soil cover.  Loss of mechanical strength of
some of the waste materials in the fill, as a consequence of chemical and biological reactions,
results in some size reduction of the  wastes due to the internal  compressive forces.
Settlement of soil particles and other fines among the larger particles  of waste due to  the
gravitational  force  is  also responsible for some consolidation.   Settling (defined as  the
decrease in volume containing a given mass of material) of the completed fill is an end result
of compression.  This settling  is in addition to the settlement brought about by other reactions
(e.g., the loss of mass due to chemical and biological decomposition).
Absorption is also a physical  phenomenon  that takes place in  a landfill.   The  primary
consequences of absorption are: 1) the  bulk retention  and immobilization  of dissolved
pollutants by preventing water from transporting them and suspended pollutant particulates
outside the boundary of the  fill, and 2)  softening and subsequent loss of strength of  the
biodegradable organic materials. Absorption is the process whereby substances are taken in
by capillary attraction.  The absorption potential of a fill is closely related to its fiber content. In
industrialized countries, most of the absorption potential of landfilled municipal waste is derived
from its paper content. Only minor absorption takes place on other types of fibers (e.g., cotton
and wool). The reason is that  their concentrations in waste disposed in industrial countries are
relatively small.

In economically developing countries, the circumstances may be significantly different.   For
example, the concentrations of paper and other types of fiber usually are small and, therefore,
absorption due to fibers typically is minor in  extent.  In addition to low concentrations of fiber,
much of the fiber may already  be saturated or nearly saturated since the solid wastes in many
developing areas contain high  concentrations of wet, putrescible matter.  However, exceptions
to these circumstances exist  For example, certain crop residues (especially dry residues) may
provide some absorption potential, and some island communities can have high percentages
                                                                                   11-3

-------
 of paper packaging in  their waste streams as  a result of their dependence on  imported
 commodities.
 Finally, it should be recognized that in many cases, eventually all absorbent materials in a fill
 become saturated.  Consequently,  absorption may only function as a delaying action with
 regard to the release of pollutants.
 The absorption of gas  in water also is an absorption phenomenon that  occurs within the
 environment of the landfill.  For example, CO2 (a major component of landfill gas) dissolves in
 water within the landfill environment.
 Reduction of particle size occurs as a consequence of some landfill processes.  For instance,
 compaction equipment reduces  the particle  size  of waste  components such  as  glass
 containers and paper packaging when they are first placed in the fill.  Once the wastes are
 within the fill,  microbial attack breaks down the compressive and tensile strength of many of
 the organic components - thus, resulting in their breakup. At the same time, the shifting of the
 particle size distributions of the materials to finer sizes promotes the chemical and biological
 reactions that occur in the fill.  The rates of the reactions are promoted because they usually
 are strong functions of the available surface area of the substrate (in this case, waste materials
 in the fill) and, therefore, of particle size.

 11.2.2    Chemical
 Two major types of chemical reactions occur in a landfill: oxidation/reduction reactions and pH
 dependent reactions. The pH dependent reactions are a consequence of .the presence of
 organic acids and  carbon dioxide (CO2) produced or synthesized by the biological processes
 and  dissolved in water (H2O). The pH  dependent  reactions include those  that affect the
microscopic surface characteristics of materials, such as adsorption, and those that  affect the
solubility of chemical compounds.  The extent of the oxidation/reduction reactions  in a fill is
                                                                                  11-4

-------
 controlled by the level of oxygen in the fill; initially, the oxygen is incorporated into the fill when
 it is  constructed.   Ferrous  metals are particularly susceptible to the oxidation/reduction
 reaction.

 Reactions  involving organic  acids  and dissolved CO2  are typical acid-metal reactions.
 Products of these reactions primarily are the metallic ions and salts in the leachate within the
 fill. The presence of the organic acids leads to the dissolution and mobilization of substantial
 quantities of waste materials in the fill and, consequently, to potential sources of pollution. The
 dissolution of CO2 in  water  lowers the  pH, rendering many metals soluble, but especially
 calcium and magnesium.   Carbonates and metal ionic matter are characteristically found in
 leachate.

 The amount of water that enters a fill  has a very important bearing on the reactions occurring
 in the fill.  Water acts as a medium for the solution of soluble substances and for the transport
 of unreacted materials.  These unreacted materials consist of living and non-living particulates.
 Particulate sizes range from colloidal  to several millimeters.  The solubility of  many chemical
 compounds is a strong function of pH.

 In a typical fill,  the  broad variety of  components and particle sizes of the wastes  provide
 conditions that lead to an extensive amount of adsorption. Of all the  physical phenomena that
 take place in a fill, adsorption is one of the more important ones because it brings about the
 immobilization of many living and non-living substances that could pose a problem if allowed to
 reach the environment external to the landfill.   Adsorption is the adhesion of molecules to a
 surface.  Adsorption can play  an important role in the containment of viruses  and pathogens
 and of some chemical compounds. However, adsorption has its limitations.  One significant
                              .1
 limitation is its lack of longevity. A number of factors  can alter the longevity of adsorption sites.
 For example,  the properties  of the sites can be  altered  by the effects of biological and
chemical decomposition.
                                                                                   11-5

-------
 Chemical reactions, as well as chemical characteristics of some of the materials in the landfill,
 can have a negative effect on the environment. This is particularly the case in disposal sites in
 economically developing countries which do not have adequate controls of inputs and allow
 the final disposition of different pollutants such as insecticides, herbicides, caustic materials,
 and others. The by-products of reactions usually can be found in monitoring wells.
 Some important compounds that can be used as indicators of potential migration of pollutants
 from the landfill are nitrates (NO3), volatile fatty acids (VFAs), and ammonium ions (NH3*).  Of
 the three indicators, the latter two are  better and preferred in  comparison to monitoring of
 nitrates. The ammonium ion is found at relatively high levels in the breakdown of products of
 organic materials. Ammonium ions are particularly troublesome because generally they are
 very mobile in a moist subsurface system. The application of NH9* as an indicator of possible
 pollution would be valid provided that other possible sources of ammonium ions,  such as
 fertilizers, are not located in the vicinity [1].

 Other indicators of off-site migration of chemical species and pollutants are elevated levels of
 Ca, Mg, Cl, specific conductance, total organic carbon, and BOD and COD in monitoring wells
 or surface waters.  Local circumstances and conditions generally  govern and dictate which
 indicators are the more appropriate for monitoring purposes.

 11.2.3   Biological
The biological  reactions in  a fill are important for two  reasons.   One reason is that  the
biodegradable organic materials contained in the wastes are rendered biologically stable and,
therefore,  no  longer  constitute  a  potential source  of pollution.  The  major types  of
biodegradable organic solid  wastes include food waste, vegetative wastes, paper and paper
products, and "natural fibers" (fibrous material of plant or animal origin).
                                                                                   11-6

-------
The second reason of importance is the conversion of a sizeable portion of the carbonaceous
and proteinaceous solids into gas; thereby substantially reducing the mass and, therefore, the
volume of the biodegradable organic solid wastes.
Only a small fraction of the  nutrient  elements in  the  waste is converted into microbial
protoplasm.  Eventually, as portions of the microbial population die, this protoplasm will be
subject to decomposition and, hence, will make up a reservoir of material for breakdown in the
future.
In general,  biological decomposition can take place under aerobic or  anaerobic conditions.
Since wastes are placed and rest in the fill over a substantial period of time, the environment
within the landfill system is a dynamic one.  For a particular location within the fill (i.e.,  with
reference to the initial volume containing a particular mass of wastes),  the aerobic reactions
precede  the anaerobic  reactions.    Although both  phases  are   important,  anaerobic
decomposition  exerts the  greater  and  longer-lasting influence in  terms  of associated
characteristics of the fill.  A typical time-history of the aerobic and anaerobic  processes  in a
landfill is illustrated in Figure 11-1.
The primary form of decomposition immediately  after the wastes are buried is aerobic.  This
period of time is called the "aerobic phase." The decomposition continues to be aerobic until
all of the oxygen (O2) in the air entrapped in the fill  is depleted and all dissolved oxygen in
intruding precipitation has been utilized.  The by-products of the aerobic reaction are heat and
CO2, H2O, and inorganic material if sufficient oxygen is available for the  reaction to proceed to
completion.  In practice, the duration of the aerobic phase is relatively brief and depends upon
the design and operating conditions of the  fill,  including the  degree  of compaction of the
wastes  and the moisture content (moisture displaces air from the interstitial  spaces among
particles of  waste).   Microbes  active during this phase  include  obligate, as well as some
                                                                                   11-7

-------
                                 200
         COD = Chemical Oxygen Demand
         TVA = Total Volatile Acids
       400
Time (days)
600
           Figure 11-1.  Characteristics of Chemical and Biological Processes
                                Occurring in a Landfill
facultative, aerobes.  During the aerobic phase, temperatures in the interior of the fill can be as
high as 45 to 55°C.

Adverse  environmental impacts during the aerobic phase are minimal because the ultimate
end-products of biological aerobic decomposition are inert  inorganic solids, CO2, and H2O.
Although  intermediate breakdown products may be released during the aerobic  phase,
typically their amounts and relative contribution to pollution are small.

As previously indicated, the amount of oxygen  buried with  the wastes is depleted relatively
rapidly.   Consequently, most of the biodegradable organic matter in a landfill eventually is
exposed  to  anaerobic biological  processes.   Microorganisms  responsible  for anaerobic
                                                                                  11-8

-------
 decomposition include both facultative and obligate anaerobes.  Among other features,  a
 noticeable distinction between the aerobic phase and the anaerobic phase is the absence of
 any significant generation of heat in the latter phase.  Consequently, the temperature or the
 rise in temperature in the landfilled wastes gradually drops from the high temperatures or heat
 generation  rates,  respectively, that are  characteristic  of  the  aerobic  phase to those that
 approach that of the ambient during  the course of the anaerobic phase.

 The by-products of anaerobic decomposition can exert a considerably adverse effect on the
 environment unless they are properly controlled.  Two groups of by-products can be  defined:
 1) volatile organic acids, and 2) gases. Most of the organic acids are short-chain fatty-acids
 and characteristically are malodorous.  They form a  portion  of the  intermediate  products
 (others are H2 and CO2) produced during the first phase (commonly termed the acid forming
 stage) of the anaerobic process.  Examples of organic acids are formic, acetic, propionic, and
 isovaleric acids. Because of the presence of the acids,  the pH of the local environment is low
 (acidic) and the liquid (leachate) is chemically aggressive. The result is high strength leachate,
 both in terms  of concentrations  of ions  and  organics.  In addition  to  serving in chemical
 reactions with other components,  the acids serve as  substrates for methane-producing
 microorganisms. The second phase (methanogenic) of the anaerobic process is characterized
 by conversion of the fatty acids and H2, produced in the acid forming stage, to CO2 and CH4.
 The environment of  this phase is characterized by a neutral pH and a leachate that is less
 aggressive than that of the acid-forming phase.

 The two principal gases formed during the anaerobic process are methane (CH4) and carbon
 dioxide (CO2).  Hydrogen sulfide (H2S), hydrogen (H2), and nitrogen (N2) usually are present in
 trace or minor concentrations.

The environmental  factors  that  affect all  biological  activities substantially  influence the
processes, rate, and extent of biological decomposition in  a fill. The processes of biological
                                                                                  11-9

-------
 decomposition  determine  the  nature of  the  decomposition  products.   The  rate  of
 decomposition governs a number of activities, including the length of time during which the
 completed fill must be monitored for possible emissions of pollutants and the time period that
 must pass before the completed fill can  be used.  This situation  exists  regardless of the
 eventual end use, whether for recreation, agriculture, or other purposes.
 One important effect of decomposition  on  the use of the completed fill is its influence on the
 rate and amount of settlement (i.e., reduction in elevation of the landfill surface).  Settlement
 usually is a  major constraint on the use  of the completed fill.   Settling continues until the
 process of biological decomposition is completed.  Obviously, any enhancement of the rate of
 decomposition will render the site fit for use sooner than can be achieved if the processes are
                     ; ,
 left to their normal (i.e., uncontrolled) rate of reaction. Equally obvious is the fact that the use
 of landfill property prior to biological stabilization can be a  risky and potentially dangerous
 undertaking.
 The principal factors that affect biological decomposition in a modem landfill are moisture,
 temperature, the microbial nutrient content, and degree of resistance of the waste to microbial
 attack.   Of the above factors and considering  the  majority of landfill environments and
 operating practices, moisture is the most important variable with respect to rate and degree of
 decomposition that will  occur in  a  fill.  Under anaerobic  conditions, the higher the moisture
 content of the waste, the more active are the biological processes. When the moisture content
 of biologically degradable wastes  is  less than  approximately  20%,  anaerobic activity  is
 substantially reduced.  Therefore, anaerobic decomposition can be expected to proceed very
 slowly in the case of modem landfills  (where water intrusion is  substantially controlled and
 curtailed) and the wastes are relatively dry or in the case of disposal sites situated in arid
regions  that accept wastes having low concentrations of wet wastes (e.g.,  biosolids, food
preparation wastes, and green vegetative wastes).
                                                                                  11-10

-------
Microbial activity increases with a rise in temperature until a level of about 40°C is reached if
other conditions are not limiting. For some types of microbes, the upper temperature impeding
activity is on the order  of 55 to 65°C.  The  former  type of  microorganisms are termed
"mesophiles," and the latter  type are  termed "thermophiles."   Some mesophiles are high
temperature  tolerant (facultative thermophiles), and  some  thermophiles  are tolerant of
temperatures in the mesophilic range (facultative  mesophiles).   Because  temperatures in
tropical regions are more favorable (as are the  conditions of moisture in the humid tropics),
decomposition proceeds very  rapidly and to a greater extent than in other regions of the world.
Nutrients play an important role in the processes of decomposition.  Wastes that possess a
high percentage of readily putrescible organic matter approach the ideal in terms of supplying
the levels of nutrients required to optimize the process of decomposition of the substrate.
Among the wastes that fall into such a category are green crop debris, food preparation waste,
market wastes, and  animal  and human manures.   A noteworthy point  is  that  such  a
combination  of ideal decomposition factors oftentimes  exists  in economically developing
countries which are in humid tropical regions of the world.

11.3   In-Place Density
Some of the  more important factors that determine  or influence in-place density (i.e., density
after the wastes have been deposited in the fill) include:

•      initial composition  and  characteristics of the wastes, including moisture content;

•      fill design and operating conditions, especially those conditions that determine the initial
       in-place density of the wastes (type of compacting equipment, number of passes) and
       the extent of moisture in the fill;

•       the processes of decomposition and their end-products;
                                                                                 11-11

-------
 •     weight of cover material; and

 •     settlement of the entire mass.

 Settlement of the mass occurs over the course of time as a consequence of a progressive
 increase in density  brought about by several phenomena acting in parallel.  The phenomena
 include the consolidation of landfill components, the pressure exerted by the overlying weight
 of the wastes and cover material, and the decomposition of the wastes.

 The in-place density of municipal solid wastes in  a properly constructed and operated, and
 relatively deep, landfill in industrialized countries can be on  the order of 900 kg/m3.  On the
 other hand, the in-place density of waste in a poorly compacted fill might be only about 300
 kg/m3.  In the United States, the usual range of density directly after compaction is on the order
 of about 475 to 710 kg/m3 [2]. On the other hand, the in-place density of wastes landfilled in
 countries in the Latin American region has been found to be on the order of 860 kg/m3 (wet
 basis), due primarily to the relatively high moisture content of the waste and its effect on the
 realized levels of compaction and settlement [3].

 11.4  Settlement
 The settlement of the wastes in a landfill is manifested by a decrease over time in the height of
 the affected  mass and subsequent reduction in elevation of the surface of the fill.  The rate
 and magnitude of settling is not uniform as a function of time nor of location within the fill. The
 lack of uniformity  may be a serious constraint on the use of the completed fill.  Generally, the
 larger the concentration of organic wastes placed in the fill and the deeper the fill, the greater
will be the magnitude of the settling. If the degree of compaction and type of waste are similar,
the rate of settling depends primarily on the rate of decomposition of the wastes and, hence,
upon the factors that influence decomposition.
                                                                                 11-12

-------
 Natural variations in the above factors and wide differences between operational procedures
 encountered in landfill practice similarly yield wide variations among reported rates and the
 magnitude of settlement. The total settlement of a completed volume of fill in an industrialized
 country over its lifespan usually is within a range of 1 to 20%, with the value falling within 10 to
 15% in the majority of cases. Of the total settling, usually about 90% takes place during the
 first year [2]. Some sites have reported that the rate of settlement was greatest during the first
 month after completion, and was small and relatively uniform after the third month.

 Regarding the influence of climatic conditions, one study of a 6 m  deep fill in a region of
 moderate rainfall (>11  cm/yr) and moderate temperature, reported settling of about 20% after
 the first year of completion. In comparison, a 23 m deep landfill and a 14 m deep fill in an arid
 region (<6 cm/yr of rain) and somewhat warmer temperature, experienced  settling of  only
 about 3% by the third year after completion [2].
 In "Settlement of Landfill," A.C. Cheney [4] states that no physical settlement Will occur if the
 initial density exceeds  1,060 kg/m3;  nevertheless, a theoretical settlement of 40% is possible
 due to waste decomposition processes. According to the same reference, overall annual rates
 of settling of 0.5 to 4.7% have been  measured in practice in the case of fills having original in-
 place densities of 650 to 1,200 kg/m3.

 References
 1.     U.S. Environmental  Protection Agency,  Design,  Operation, and Closure of Municipal
       Solid Waste Landfills, Seminar Publication, Office of Research and Development,
       Washington, DC, EPA/625/R-94/008, September  1994.
2.     Diaz, L.F., G.M. Savage, and C.G. Golueke, Resource Recovery from Municipal  Solid
       Wastes, Vol. II, Final Processing, CRC Press, Boca Raton, Florida, 1982.
3.     Zepeda, F., et al., "Evaluation de Gases y Lixiviados en los Microrrellenos de Lima,"
       CEPIS/PAHO, Lima, Peru, 1989.
4.     Cheney,  A.C.,  "Settlement  of  Landfill,"  Harwell Landfill Completion  Symposium,
       Cockcroft Hall, HMSO, London, England, May 1983.
                                                                                11-13

-------
 Chapter 12
 Leachate Formation and the Water Balance

 The quantity of leachate that could be generated in a landfill can be predicted by performing a
 water balance.  A water balance involves an accounting of liquid flows into and out of the
 landfill system, and  of liquid stored within the system.  The major component of the liquid
 phase in landfills is, of course, water. In most landfills, the significant inflows are precipitation
 and water contained in the delivered waste, and the significant outflow is leachate.  Under
 some special circumstances, water produced during the decomposition of waste and water lost
 as water vapor may be of significance to the water balance. Such circumstances can include
 the case of a landfill located in a desert location. Initially, for a new volume of landfilled waste,
 some of  the water  inflow  (from percolation  into the fill) will be absorbed by the  waste.
 However, in the long run, the rate of leachate produced by a landfill becomes essentially equal
 to the rate of infiltration of precipitation.

 As discussed in Section 6.3, the water balance around a landfill system is also relevant to the
 classification and selection of potential sites for landfill development,

 12.1  Water Balance
 All of the various components of a water balance for a landfill are presented in Figure 12-1. As
 shown in the figure, the sources of water are: water entering the fill through the cover, moisture
 in the cover  material, and inherent moisture in the  solid waste.  As a consequence of the
 processes of decomposition that occur in a landfill, a certain amount of moisture is converted
 to the gaseous constituents of the landfill gas (i.e., CH4 and CO2).  In addition, water also
 leaves the landfill in the form of saturated water vapor in the landfill gas.  The remainder of the
water becomes leachate.   Each one of these primary sources of water is discussed in the
following sections.
                                                                                  12-1

-------
                                        Precipitation
                Evapotranspiration     Direct
                                  evaporation
                                                      jrface infiltration
                                                       Water stored in cover
                                                            Water in gas
                           Water in waste
                                Water from decomposition
         Groundwater inflow
Groundwater inflow
                                         Leachate
           Figure 12-1.  Various Components of a Water Balance for a Landfill

 12.1.1    Water Entering Through the Cover
 This component of the water balance consists primarily of rainfall that percolates through the
 cover (strictly speaking, there may be  other sources of  surface water such as storm water
 runoff and artesian springs).  One of the most important  steps in the performance of a water
 balance in a landfill  is the prediction of the quantity of rainfall that actually penetrates the
 landfill cover.  In developing countries, where the refuse rarely is covered, the major portion of
 the precipitation would enter the fill.  Flow in a  vertical percolation layer either is downward
 (due to gravity drainage) or removed (via evapotranspiration).   Some computer models have
 been developed to predict the amount  of water that percolates through the landfill cover.  A
 computer model widely used in the United States is called the Hydrologic Evaluation of Landfill
 Performance (HELP) [1].   Following is another approach  that can be used to  obtain  an
approximation of the quantity of percolation that can be  expected in  a landfill by means of a
conventional hydrological water balance.
                                                                                  12-2

-------
       5MC « P-RO-ET-PER
 where:
       SMC = change in the amount of moisture stored in a unit volume of landfill cover (cm),

       P = quantity of net precipitation (incident precipitation less runoff) per unit area (cm),

       RO = quantity of runoff per unit area (cm),

       ET = quantity of moisture lost through evapotranspiration per unit area (cm), and

       PER = quantity of water which percolates through the cover per unit area of soil cover
       (cm).

 The total amount of moisture  that can be stored in a unit volume of soil is a function of two
 variables - the field capacity  (FC) and the permanent wilting percentage (PWP).  The FC is
 defined as the maximum quantity of liquid which remains in the pore space under gravitational
 force. The PWP is defined as the quantity of water that remains in a soil after plants are no
 longer capable  of  extracting  anymore water.   Basically, the difference between the field
 capacity and the permanent wilting percentage is equivalent to the quantity of moisture that
 can be stored in a particular type of soil. Runoff coefficients, given as a function of rainfall for
 different types of soils with and without a vegetative cover, are presented in Table 12-1.

 Other information required, such as rainfall  and evapotranspiration,  are  site-specific and
 generally can be obtained through local or national weather institutions.

 12.1.2    Water Present in  the Solid Waste
 Moisture that enters the landfill with the residues is that water inherent in the waste, as well as
that moisture which has  been  absorbed from other sources (e.g., rainfall).  Depending upon
climatic conditions, as well as  the type and quality of the containers used to store waste for
collection, the inherent moisture and the moisture from other sources have a range of values.
                                                                                   12-3

-------
            Table 12-1.  Runoff Coefficients for Different Soil Cover Materials
                            and Different Vegetation Types
Soil Cover
Grassed Soil


Bare Soil


Slope (%)
Oto5
5 to 10
10 to 30



Soil Texture
Sandy Loam
0.10
0.16
0.22
0.30
0.40
0.52
Loamy Clay
0.30
0.36
0.42
0.50
0.60
0.72
Clay
0.40
0.55
0.60
0.60
0.70
0.82
 Source:  Reference 2.

 The moisture content of municipal solid waste commonly ranges from 30 to 60% (wet-weight
 basis), depending upon the location and season.

 12.1.3    Water in the Cover Material
 The quantity of water that enters with the cover material depends upon the type and source of
 the cover material, as well as the time of the year and climatic conditions of  the.particular
 location.  The maximum amount of water that can be contained  in the cover material is
 determined by the field capacity of the material.

 12.1.4    Water Utilized in the Formation of Landfill Gas
 The decomposition of the organic fraction  of the waste utilizes a certain amount of water. The
 quantity of water used in the process can be estimated using theoretical approximations of the
 decomposition process.

 12.1.5    Water Lost as Water Vapor in Landfill Gas
Landfill gas typically is saturated with water vapor.  The quantity of moisture that leaves the
landfill in this form may be estimated by using the perfect gas law.
                                                                                12-4

-------
1 2.1.6    Water Exiting the Fill
Water that leaves the landfill is called leachate (the term "leachate" also applies to water within
the landfill that is in contact with the waste).

12.1.7   Field Capacity of a Landfill
Water which enters the fill, is not used in the biochemical reactions, and does not exit as water
vapor with the landfill gas may have either of two fates: 1) the water may be held within the
landfill, or 2) the water may become leachate. The materials that compose the cover and the
waste in the fill each have their own field capacities which can store moisture and, therefore,
keep it from flowing until saturation  occurs.  The potential  quantity of leachate  that can be
generated in a particular landfill is the amount of moisture in the landfill in excess of the field
capacity.  The field capacity of a landfill varies as a function of the weight of the  overburden.
The FC (i.e., the fraction of the water in the waste based on the dry weight of the waste) can
be estimated using the following equation [3]:

       FC = 0.6-0.55 [W/(10,000+W)]
Where:
       FC = field capacity, and

       W =  weight of overburden calculated at the middle of the lift (kg).

Given all  of the  elements in the previous indented sections, the components of the water
balance for a landfill can be expressed as follows:

       8MC  « W^+We+Wp-Wtfa-W^W^+Wteach
where:
      SMC  = change in the quantity of moisture stored in the landfill (kg/m3),

      W™ = moisture in the incoming solid waste (kg/m3),
                                                                                  12-5

-------
       Wc = water in the cover material placed on the waste (kg/m3),
       Wp = water from precipitation and other outside sources (less runoff) (kg/m3),
       Wirg = water utilized in the formation of landfill gas (kg/m3),
       Wv = water lost as saturated vapor with the landfill gas (kg/m3),
            = moisture lost due to evapotranspiration (kg/m3), and
             = water leaving the (control volume) landfill as leachate (kg/m3).
 The water balance for a landfill during a particular time increment is prepared by adding the
 mass of water that enters a unit area of a particular layer of the fill to the mass of water of the
 same layer which remained from the previous time increment and subtracting the mass of
 water lost from the layer during the present time increment.  The result of this analysis is
 known as the "available moisture" for that particular layer of the landfill at a particular time. In
 order to ascertain if any leachate will be formed, the available moisture is compared to the field
 capacity of the fill. Leachate will be formed if the amount of water present (available moisture)
 exceeds the field capacity of the fill.

 12.2  Leachate  Migration
 In typical" landfills, leachate migrates to the bottom of the fill. In situations where the landfill is
 not lined,  the leachate will have the tendency to migrate in a  generally downward direction
through the underlying soils.  However, depending upon the type of material surrounding the
fill, it is possible that a certain amount of lateral migration of the leachate will take place along
the soil-waste interface.  One of the major concerns associated with the uncontrolled vertical
migration  of the leachate is  the potential contamination of the groundwater.  The rate of
migration of the leachate can be estimated by using Darcy's law, as discussed in Chapter 6.
                                                                                    12-6

-------
       Q « KSAH/L
where:
       Q = flow rate of leachate (liters/yr).

       K = hydraulic conductivity (Iiters/m2-yr),

       S = cross-sectional area of the fill through which the leachate flows (m2),

       AH/L = hydraulic gradient (m/m), and

       AH = head loss (m).

Typical values for the hydraulic conductivity for various soils are presented in Table 12-2.
                Table 12-2.  Hydraulic Conductivity (K) for Various Soils"
Material
Uniform Coarse Sand
Uniform Medium Sand
Clean, Well-graded Sand and Gravel
Uniform Fine Sand
Well-graded Silty Sand and Gravel
Silty Sand
Uniform Silt
Sandy Clay
Silty Clay
Clay (30 to 50% clay sizes)
Colloidal Clay
m/day
4.1 x 102
1 x 102
1x102
4.1 x 10°
4 x 10"1
9x10"2
5 x 10'2
5X10"3
9X10"4
9x10-*
9 x ID'7
Iiters/m2-yr
1.5x10"
3.7 x107
3.7 x 107
1.5x106
1.5x105
3.3 x 10*
1.8 x 104
1.8x103
3.3 X102
3.3 x 101
3 x 10"1
      Adapted from References 2 and 4, and based on laminar flow.
                                                                                  12-7

-------
12.3   Characteristics of Leachate
The wastes in the landfill undergo processes of decomposition.  During the processes, both
organic products  and inorganic soluble compounds leach into solution.  As is evident from
earlier chapters, some leachate characteristics are governed by the environmental conditions
in the fill, primarily by the presence or absence of oxygen (air), while other characteristics are
relatively independent of the conditions. A summary of the characteristics of leachate from
municipal solid wastes is  presented in Tables 12-3  and 12-4.  The  data in  the table
demonstrate the variability of composition and properties of the leachate. Thus, it is advisable
not to depend on "average" values,  but to collect  actual data on the characteristics of the
leachate before a treatment system  is designed.   The chemical characteristics of leachate
depend not only on the composition of the waste, but also on the age of the landfill and the
events that took place prior to the collection of the sample.  For instance, the biological oxygen
demand of the leachate  decreases with time.   This, of course, is due to the fact that the
biodegradable materials in the fill are reaching a state of stability.
                                                                                  12-8

-------
  Table 12-3. Example of Leachate Characteristics from Municipal Solid Wastes
                      (acid and methanogenic phases)
Acid Phase
Parameter
pH
BODS

COD

BODs/COD
S04
Ca
Mg
Fe
Mn
Zn
Units
—
mg/l

mg/l

—
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
Average
6.1
13,000

22,000

0.58
500
1,200
470
780
25
5
Range
4.5 to 7.5
4,000 to
40,000
6,000 to
60,000
—
70 to 1,750
10 to 2,500
50 to 1,150
20 to 2, 100
0.3 to 65
0.1 to 120
Methanogenic Phase
Average
8
180

3,000

0.06
80
60
180
15
0.7
0.6
Range
7.5 to 9
20 to 550

500 to 4,500

—
20 to 600
20 to 600
40 to 350
3 to 280
0.03 to 45
0.03 to 4
Source:  References.
               Table 12-4. Example of Leachate Characteristics
               that are Relatively Independent of Landfill Phase
Parameter
Cl
Na
K
Alkalinity
NH4
org. N
Total N
NO3
NO2
Total P
As
Cd
Co
Ni
Pb
Cr
Cu
Hg
Units
mg/l .
mg/l
mg/l
mgCaCCyi
mgN/l
mgN/l
mgN/l
mgN/l
mgN/l
mgP/l
M9/I
Mg/l
M9/I
Mg/l
Mg/l
Mg/l
Mg/l
M9/I
Average
2,100
1,350
1,100
6,700
750
600
1,250
3
0.5
6
160
6
55
200
90
300
80
10
Range
100 to 5,000
50 to 4,000
10 to 2,500
300 to 11, 500
30 to 3,000
10 to 4,250
50 to 5,000
0.1 to 50
Oto25
0.1 to 30
5 to 1,600
0.5 to 140
4 to 950
20 to 2,050
8 to 1,020
30 to 1,600
4 to 1,400
0.2 to 50
      Source:  Reference 5.
                                                                         12-9

-------
References

1.     Schroeder, P.R., C.M. Uoyd, P.A. Zappi, and N.M. Aziz, The Hydrologic Evaluation of
       Landfill Performance (HELP)  Model  -  User's  Guide for  Version  3,  U.S. EPA,
       EPA/600/R-94/168a, September 1994.
2.     Salvato, J.A., W.G. Wilkie, and B.E. Mead, "Sanitary Landfill Leachate Prevention and
       Control," Journal Water Pollution Control Federation, 43(10), 1971.
3.     Huitric, R.L, S. Raksit, and R.T. Hang, "In-Place Capacity of Refuse to Absorb Liquid
       Wastes,"  presented at  the Second National Conference  on  Hazardous  Material
       Management, San Diego, California, 1979.
4.     Davis, S.N. and R.J.M. DeWiest, Hydrogeology, John Wiley & Sons, New York, New
       York, 1966.
5.     Ehrig, H.J. and T.  Scheelhaase, "Pollution Potential and Long Term Behaviour of
       Sanitary Landfills," Proceedings Sardinia 93,  Fourth International Symposium, Cagliari,
       Italy, October 1993.
                                                                               12-10

-------
 Chapter 13
 Leachate Collection and Management Systems

 13.1  Introduction
 The decision to either include  or exclude a leachate collection and treatment system in the
 design of a landfill facility in an economically developing country is a critical one.  It is an
 important decision because if the system is included, it will require a commitment of additional
 funds not only for the design and construction, but also for the operation and maintenance of
 the system. On the other hand, if a leachate collection and treatment system  is not included,
 the conditions could be such that the leachate could contaminate the land as well as potential
 sources of water supply.
 Under some  conditions,  methods  of leachate  treatment  can  be  relatively simple  and
 inexpensive in comparison to  those  that use complex liner systems, piping systems,  and
 systems for processing the collected leachate. The conditions include those where the threat
 to land and water.resources and the public safety  are low.  Under these  special sets of
 conditions, natural soils or even liners of compost may serve as "treatment systems."

 The decision regarding the  need for  control and treatment of leachate and regarding  the
 design of the system required to achieve the necessary degree of control must be based on
 factual information (including that related to the degree of risk) and in close coordination with
 knowledgeable professionals.

 In general, the implementation of a leachate collection and treatment system involves  the
following four major steps:  1) identification and selection of the type  of  liner to be used;
2) preparation of a grading plan for the site, including location of channels and pipelines for the
collection and removal of the leachate; 3) design of the facilities for the removal, collection,
                                                                                 13-1

-------
 and storage of the leachate; and 4) selection and design of the leachate management (e.g.,
 treatment) system.
 The rate of leachate  production can be estimated  by conducting a water balance.  It is
 important to design for the maximum estimated inflow rate because this rate has a direct effect
 on the depth of leachate on the collection system.  Typically, maximum inflow rates take place
 in areas without any final or intermediate covers, such as  the active working face and any
 areas awaiting waste deposition.

 13.2  Identification and Selection of Liner
 As has been previously indicated, the type of bottom liner to  be used for a landfill is a function
                                                                           .1;."
 of  a  number of factors.  Some  of these factors include geological conditions, of the site,
 requirements for environmental protection, and availability and cost of the liner material. The
 location and quality of the groundwater, as well as the requirements for the control of leachate
 and gas migration, will also have an influence on the final selection.
                                      ;--.:_]
 13.3  Leachate Collection Systems
 The primary purpose of the leachate collection facility is to collect,  as  quickly as possible,
 leachate from the landfill.   The  amount of leachate within the  landfill must be kept to a
 minimum because the water pressure can drive leachate through a permeable liner or through
 imperfections in the liner, and can adversely affect the integrity and properties of the liner. The
 relative size of the leachate collection facility is a function of climatic conditions, topography of
the site, operating procedures, and the quantity of leachate to be expected.  Installation of the
facility should be made in a manner which is compatible with the contour of the bottom of the
landfill and with the liner system.  The design must be made such that the leachate collection
system functions as an effective drainage unit, and clogging of its components must be
prevented at all times.
                                                                                   13-2

-------
The drainage system plays an important role in the performance of the leachate collection
system.  The drainage layer performs two key functions: 1) it provides a path for the leachate
to easily and preferentially migrate toward the collection pipes, and 2) it offers protection to the
bottom liner from both the solid waste deposited in the first lift and from the heavy equipment.
The most appropriate material for use as drainage layer is gravel (preferably rounded and free
of roots, vegetation, and construction debris). Coarse sand or a mixture of sand and gravel
can also be  used, but the trend has been to use more permeable  materials.  The material
should be carefully graded to prevent clogging of the gravels surrounding the collection pipes.
Leachate drainage systems may include more than one layer of filters.  Clogging between the
filter layers can be prevented by installing filter fabrics between them. The efficiency of the
leachate collection system is highly dependent upon the hydraulic conductivity of the drainage
layer.  As the hydraulic conductivity decreases, the rate of removal of the leachate decreases,
and thus the liquid accumulates at the bottom of the fill.

There are several types of designs that can be used for the collection and removal of leachate
from a landfill.  The most common design in the United States and Europe consists of a liner
with shallow, sloped (about 3 to 5%), V-shaped troughs, each with a collection pipe  located at
the inverted apex of the troughs. The troughs and pipes are spaced on centers of 30 to 40 m
and sloped about 1% to the sumps on one end.  The leachate is collected downgradient and
pumped through a sidewall riser. Two other leachate collection system designs are described
in the following subsections.

13.3.1   Piped Bottom
As the name implies,  the design of the piped bottom leachate collection system involves the
placement of clay barriers (or other suitable liner material) and perforated leachate collection
pipes at the bottom of the site.  As  shown in Figure 13-1, the barriers take the shape of a
rectangle having a width similar to that of a landfill cell.  In industrialized countries, a layer of
                                                                                  13-3

-------
                      Slotted leachate
                      collection pipes
   Slotted pipe sloped and
    connected to leachate
         removal system,
Clay berms     First cell to be developed
              sas^- &    .Leachate
              ssr\ &  /collection line
              v  \  \    X
                                                                          Stormwater
                                                                          collection line
                      Figure 13-1. Diagram of Piped Bottom Design

 geomembrane is placed on the day, as shown in Figure 13-2. Once the barriers (clay and
 geomembrane) are in place, a series of slotted leachate collection pipes are placed directly on
 top of the geomembrane. Typically, the leachate collection pipes are perforated and have a
 diameter of about 10 cm. In the United States, the slots are cut very precisely (by means of
 lasers), such that they are about the size of the smallest grain of sand (about 0.00025 cm).
 The leachate collection pipes are spaced about 10 to 20 m apart and are carefully covered
 with a layer of sand or gravel (drainage layer). The spacing  between the pipes dictates the
 depth of leachate that will be allowed to accumulate at the bottom of the fill. Generally, the
 drainage layer is about 60  cm thick and is placed on the pipes well before any waste is
deposited on the site. A filter fabric can be used above the drainage layer to prevent clogging.
The  first layer of waste (about 1 m thick) placed  on  the drainage layer generally  is not
compacted.   The bottom of the fill is  sloped between 1  and 2%  to promote flow of the
                                                                                   13-4

-------
                             Perforated leachate
                               collection pipe
Protective
 soil layer
                                                                         Geotextile
                                                                         filter fabric
                                                                         Sand
                                                                         drainage layer
                                                                 Geomembrane liner
   Geotextile
   with large apparent
   opening size
 Extra geomembrane
 (optional)
                Washed gravel
                                           Compacted clay layer
                    Figure 13-2. Detail of Leachate Collection System

leachate toward the collection points.  Leachate collection pipes are installed such that they
are drained by gravity.
The piped bottom design also allows for the use of the leachate collection pipes to remove
stormwater in the portion of the landfill not receiving waste. In this arrangement, the leachate
pipes are connected directly into the .stormwater collection pipes.  Once the portion  of the
landfill is put into operation, the pipes simply are disconnected from the stormwater system
and joined to the leachate collection system.
                                                                                   13-5

-------
 13.3.2    Sloped Terraces
 In the sloped terrace system, the bottom of the fill is sloped into a series of terraces.  The
 terraces are sloped (between 1 and 5%) such that leachate flows toward collection channels.
 Each collection channel consists of perforated leachate collection pipes surrounded by washed
 gravel (about 4 to 5 cm).  In order to prevent clogging, the gravel may be enclosed by a
 protective layer of geotextile filter fabric.  The pipes are used to transport the leachate to a
 collection point for removal or treatment.  The drainage channels are sloped between 0.5 and
 1.0%. The length of the drainage channel is a function of capacity of the drainage facilities.  A
 diagram of the sloped terrace design is presented in Figure 13-3.
                           Sloped intercepting
                         leachate collection lines
               Leachate
          collection pipe
                    Sloped terraces
               Leachate
              movement'
Liner
                     Figure 13-3. Diagram of Sloped Terrace Design

13.4  Leachate Removal and Storage
There  are  two options for the removal of leachate  from a landfill.  In the first option,  the
collection pipe passes through the side of the fill; whereas, in the second option, an inclined
collection pipe located inside the fill is used to collect the fluid.  In the first option, the piping
                                                                                   13-6

-------
must be carefully constructed and installed in order to ensure the integrity of the landfill liner
system.

Adequate access should be provided to most parts of the leachate collection system in order
to allow the inspection of the system and the performance of maintenance. Adequate access
includes the installation of deanouts in order to be able to reach any section of the pipe. Due
to landfilling operations, it may not be possible to extend deanouts vertically within the landfill
area. In this situation, deanouts can be extended laterally on the bottom, toward the perimeter
of the landfill, and then along the side slope toward the surface.

Leachate that is collected from a landfill either is stored in a vault, tank, or pond, or drained or
pumped directly to a treatment facility. Storage requirements depend upon the size of the fill,
quantity of leachate generated, and the ultimate treatment or disposal option planned for the
leachate.

Holding tanks are designed to store between 1 and 3 days of leachate during peak production.
Both metallic and plastic tanks have been used for this purpose, although plastic tanks are
more corrosion resistant than untreated metallic tanks.

13.5  Management Alternatives
The method of managing the leachate formed in a landfill will dictate the risk assodated with
polluting underground  aquifers.  There  are several alternatives for the management of the
leachate.    Some  of the alternatives that are used include:  1) discharge to  an off-site
wastewater treatment system, 2) evaporation (natural or induced), 3) recirculation or recyding,
and 4) on-site treatment.
                                                                                   13-7

-------
 13.5.1   Discharge to an Off-Site Wastewater Treatment System
 In the event that the landfill is located relatively dose to a conventional wastewater treatment
 facility, it may be possible to discharge the leachate into the piping system for treatment at the
 plant. Before this is attempted, however, it is important to ascertain that the treatment plant
 would be capable of accommodating and treating the quantity and quality of the leachate, e.g.,
 additional organic loading.  In some cases, it may be necessary to institute some type of pre-
 treatment of leachate prior to discharge into the sewer. If a local sewer is not available within a
 convenient distance from the point of discharge at the landfill, utilization of a tanker truck is an
 alternative to transport the leachate to the wastewater treatment facility.

 13.5.2   Evaporation
 This is one of the simplest alternatives for the management of leachate. In this alternative, the
 leachate is stored in an evaporation pond.  (Under ideal circumstances, the pond would be
 properly lined with an impermeable material or membrane.)  The rate of evaporation, of course,
 is a function  of climatic conditions. In the event that there is a season of heavy rainfall, the
 pond must be designed to  retain the associated volume of liquid or, if practicality permits, it
 may be covered with an impermeable membrane. The rate of evaporation may be increased
 by spraying the leachate on the surfaces of both the operating and completed fills.  Although
 spraying increases the evaporation  rate,  the process brings about the potential  for the
 generation of odors, as well as the generation of aerosols which may contain bacteria.

 Evaporation can also be enhanced by heating the leachate by means of a heat exchanger. In
the event that there is a system for the collection of landfill gas, the biogas can be used as a
source of energy for the evaporation process.  Otherwise, another  source of energy must be
sought This option can be costly in a developing country  without reserves of fossil fuels. In
addition, care must be taken in the control  of potential emissions of volatile compounds, as
well as in the management of corrosion and fouling of the heat transfer surfaces.
                                                                                  13-8

-------
 13.5.3    Recirculation or Recycling
 Leachate can be effectively managed by collecting it and  recirculating it through the landfill
 environment [1].  At the beginning of landfill operations,  the leachate typically will  contain
 relatively high concentrations of BOD, COD, total dissolved solids, heavy metals, and nutrients.
 The recirculation and recycling of the leachate results in a certain amount of attenuation of
 these constituents due to the biological activity and to the physical and chemical reactions that
 take  place within the landfill.  For example, since the pH  in the landfill becomes neutral to
 slightly basic as methane is produced, some of the metals will be precipitated and retained
 within the landfill.

 The design and operation of a leachate recirculation system should take into consideration the
 fact that recirculation results in a steadily increasing reservoir of leachate if percolation of water
 into the fill is greater than evaporation of collected leachate. Thus, in locations that have low
 or insufficient rates of evaporation, buildup of leachate as a consequence of recirculation will
 be the norm and require the eventual removal and treatment of excess leachate.
              -  -     ¥.'•?'••-••-.                           C
 In the  event that rapid  stabilization of the organic matter,  as  well  as  the  collection  and
 beneficial use the landfill gas, are primary objectives of the operation, leachate recirculation
 can result in an increase  of landfill  gas  production due  to the increase of the moisture
      ,•.-/"          -  - "i • V ,**,.. ..*-,.
 availability within the fill.  An increase in the rate of stabilization would lead to an increased rate
 of settlement in the  landfill.  A sizeable reduction of the  COD  and BOD can be obtained
 through recirculation, particularly over the short term. Leachate recirculation is more effective
 in landfills whose operations involve the application of refuse in relatively thin layers.

 Care  must be exercised when adopting recirculation as a  strategy to manage the leachate.
 First of all,  purposeful introduction of moisture into the landfill may lead to pollution of the
 surroundings  by  leachate  migration  through  either the  bottom  or the sides.   Second,
continuous  recirculation will  lead  to  the buildup of salts,  metals, and  other undesirable
                                                                                     13-9

-------
 compounds in the leachate.  Furthermore, in the event that intermediate covers have been
 applied, the introduction  of leachate  may  lead  to  the  formation  of  perched or ponded
 (accumulated) water within the landfill, which may eventually  leak through the sides  of the
 landfill.
 Leachate recirculation, including treatment of the leachate, is being actively pursued in Brazil
 [2].

 13.5.4    On-Site Treatment
 If none of the alternatives presented in the preceding paragraphs are viable, then some type of
 treatment will be necessary in order to properly manage the leachate.  Just as the composition
 of the waste deposited in the landfill can vary substantially  from municipality to municipality,
 the  leachate produced in landfills can also have widely  varying  characteristics.   Unlike
 wastewater, the quality and quantity of the leachate may undergo substantial variations as the
 climate changes.  In addition, as the degradation of the contents of the landfill takes place over
 time, the quality of the leachate will also change.
 Several types of designs have been used to treat leachate.  Some of the processes include
 biological,  physical, and chemical steps.  A typical design would involve three  stages of
 treatment:  1) pre-treatment, 2) biological treatment, and 3) physical and chemical  treatment.
 Generally,  pre-treatment  involves  screening, sedimentation,  and pH  adjustment.   The
 biological treatment is designed to remove primarily the BOD, COD, and some of the nutrients.
The more common methods of biological treatment include oxidation ponds, aerated lagoons,
and activated sludge. The last and final stage may involve a series of processes principally
designed to  remove color,  suspended  solids,  heavy  metals,  and  any remaining  COD.
Processes  that may be  used for this stage include  settling,  ozone oxidation,  sand filtration,
flocculation, and others.  Specific information on the design and operation of these  systems is
available in standard texts on wastewater treatment, e.g., References 3 and 4.
                                                                                 13-10

-------
A complex leachate treatment system, which uses pH adjustment, followed by flocculation,
settling, biological treatment of the waste supernatant by means of an  aerated pond, and
chlorinatjon, is in operation in one of the final disposal sites serving Buenos Aires, Argentina.
Simple (and therefore affordable) leachate treatment systems may be the only feasible choice
for some locations.  With respect to  simple systems, storage and evaporation is  the likely
choice. Where evaporative systems are not feasible, simple biological treatment systems may
be a reasonable choice for leachate treatment, especially if the wastes are predominantly of
domestic origin, putrescible, and cellulosic.  In such situations, anaerobic or aerobic systems
would be the applicable form of treatment.  Simple aerated systems (e.g., aerated lagoons,
oxidation ponds) with hydraulic residence times of 30 to 60 days may work well, depending
primarily on  the BOD of  the leachate.  The design and performance of various types of
aerobic,  as well as anaerobic, systems for treatment of landfill leachate  are discussed in
Reference 5.

13.6  Existing Unlined Landfills
A large percentage of land disposal sites in economically developing countries do not have
            X
bottom liners. Furthermore, these facilities also lack leachate collection and removal systems,
such as those described in the preceding paragraphs.  Obviously, the  installation of such a
system in an existing land disposal site, in many cases, would require the rather unrealistic
task of excavating and removing the  solid waste.  It is possible that in some instances the
particular conditions may be such that the installation of a liner as well as a leachate collection
system may be feasible.  For example, in some cases, and especially for large land disposal
sites that are significantly polluting the environment and/or threatening the public health, it may
be necessary to  implement some type of corrective action or to improve an open dump site. In
this particular situation, a  series of steps should be  followed  in order to conduct  the work.
Although each particular case will be different, some of the steps that would be common to
                                                                                13-11

-------
 most situations are: identification and determination of magnitude of problem, control  and
 diversion of runoff, application of a cover, and installation of some type of leachate collection
 system.
 If a leachate collection system is required for an existing disposal site, it may be feasible to
 install a perimeter collection system.  In this case, as its name implies, a trench is excavated
 around the perimeter of the disposal site, most importantly on the groundwater downgradient
 side.  Ideally, the trench should be sufficiently deep to reach  low permeability  bottom soils
 below the level of the bottom of the fill.  The trench is filled with gravel and equipped with
 piezometers.  In addition, the trench should  be connected to a leachate collection sump by
 means of a drain. The entire perimeter of the disposal site should also be  encircled, if feasible,
 by means of a low-permeability-cut-off wall located beyond the trenches and installed down to
 a natural low permeability layer.  The cut-off wall serves as a barrier to lateral  migration of
 leachate.  In  cases where the required depth  of  the perimeter trench is too  deep for
       :                                                       ^""    '             •
 economical construction,  a suitable substitute may be a series  of wells spaced sufficiently
                                    -,*
 close together to simulate a continuous trench.

 If the  land area of the disposal site is  too  extensive, or for another reason the  perimeter
 collection system is not practical or cost-effective, then it may be possible to devise another
 alternative such as installation of extraction wells within the landfill. These and other options
 must  be carefully evaluated  in terms  of  practicality,  cost-effectiveness,  operation  and
 maintenance  requirements,  and other   characteristics before  a system  is  selected  for
 installation.

 13.7  Summary
The design of a leachate treatment facility must take into consideration management and ease
of maintenance.   Even  the simplest design  will  require  a  certain  degree  of  attentive
                                                                                   13-12

-------
management Furthermore, leachate treatment systems involving sophisticated, maintenance-

intensive equipment require concerted and continuous attention in order to support optimal

operation.


References

1.     U.S.  Environmental Protection Agency,  Landfill Bioreactor Design and Operation,
       EPA/600/R-95/146 (NTIS  PB96-156567), Office of Research and  Development,
       National Risk Management Research Laboratory, Cincinnati, Ohio, 1995.
2.     Queiroz Lima, L.M., LJxo: Tratemento e BiorremdiacSo, Hemus Editors Limitada, Sao
       Paulo, Brazil, 1995.
3.     Metcalf & Eddy, Inc., Wastewater Engineering: Treatment, Disposal, and Reuse, Third
       Edition, McGraw-Hill, New York, 1991.
4.     Cheremisinoff, P.N., Handbook of Water and Wastewater Treatment  Technology,
       Marcel Dekker, Inc., New York, 1995.
5.     Pohland, F.G. and S.R. Harper, Critical Review and Summary of Leachate and Gas
       Production From Landfills, EPA-600/2-86-073 (NTIS PB86-240181), 1986.
                                                                              13-13

-------
 Chapter 14
 Landfill Gas Extraction and Utilization

 14.1   Gas Production and Quality Relative to Time
 Landfill gas (biogas) constitutes one of the more important groups of products generated as a
 consequence of the biological degradation of the organic fraction of the wastes disposed in the
 landfill. Over the lifetime of a  specific volume of waste in the fill (i.e.,  a control volume in the
 engineering  sense),  the environment  proceeds  from  one  of  aerobic  processes of
 decomposition to one  of anaerobic processes.  The transition from aerobic to anaerobic
 decomposition and the  tatter's attendant methane production proceeds as a series of phases.
 The first phase is the aerobic phase.  Its duration is the time required to use up the entrapped
 Oj- This may be a few weeks or several months. The predominant gases synthesized during
 this initial stage  are carbon dioxide (COj) and  water vapor.  The second phase begins as
 conditions shift from  aerobic to anaerobic; obligate aerobes die off and facultative aerobes
 shift to their anaerobic mode; and CO2 and, to a lesser extent, hydrogen (H2) are the principal
 gases produced.  The third phase is  marked by the gradual appearance of methane (CH4).
 Methane concentration  becomes constant (in the  range of 40 to 60%) in the fourth  phase.
 Also produced during anaerobiosis is an assortment of reduced sulfur  and carbon compounds
 in trace concentrations  (e.g.,  sulfides and volatile organic acids, respectively).   Hydrogen
 sulfide (H2S) is the predominant reduced sulfide compound in raw landfill gas.

 The  concentrations  of CH4  and  C02  under methanogenic  decomposition (and other
 constituents of the gas) are influenced by several factors, including  the composition of the
waste being decomposed and access to moisture to  dissolve CO2. Typically in the case  of
 landfills and landfill gas in industrialized countries, the ratio of CH4 to CO2 is on the order of
40:60 to 60:40.  An example  of the components of  landfill gas and their concentrations is
presented in Table 14-1. The gas may also contain volatile organic compounds that may have
                                                                                14-1

-------
                   Table 14-1. Typical Composition of Landfill Gas [1]
  Component   :      ,                                   Component %
                                                       (dry volume basis)
   Methane                                                   47.5
   Carbon Dioxide                                             47.0
   Nitrogen"                                                    3.7
   Oxygen"                                                    0.8
   Paraffin Hydrocarbons                                        0.1
   Aromatic and Cyclic Hydrocarbons                             0.2
   Hydrogen                                                   0.1
   Hydrogen Sulfide                                           0.01
   Carbon Monoxide                                            0.1
   Trace Compounds'*             	0.5
 "   The presence of nitrogen and oxygen in the gas could be due to leaks in the gas
    monitoring system or to intrusion of air into the fill.
 b   Trace compounds include sulfur dioxide, benzene, toluene, methylene chloride,
    perchloroethylene, and carbonyl sulfide, in concentrations up to 50 ppm.
 been disposed with the refuse. A sample of the type of organic compounds found in a landfill
 in California, United States, is given in Table 14-2.
 Rate and volume of gas production are governed by the characteristics of the disposed wastes
 and by the  particular conditions  prevailing  within the  landfill.   The  conditions include
 temperature, pH, moisture content,  and particle size of the wastes,  The conditions within the
 landfill can vary as a function of time, depending on the design and operation of the landfill
 and on the age of the disposed wastes.  In keeping with  the fact that the characteristics of
wastes and landfill conditions vary markedly from one region to another, the reported rates of
emission of landfill gases encompass a wide range of values [1,2,3].  For example, reported
                                                                                 14-2

-------
               Table 14-2. Trace Organic Compounds in Raw Landfill Gas,
                            Mountain View Landfill, 1980 [4]
  Compound                                        Concentration (mg/m)
  1,2-Dichloroethylene                                          5.2
  Trichloroethylene                                            10.4
  Methyl Isobutyl Ketone                                        5.1
  Chlorobenzene                                               0.4
  Toluene                                                     4.0
  Tetrachloroethylene                                           4.5
  Ethylbenzene                                                4.0
  Xylene	2.3
 (estimated or measured) total yields of gas generation from landfills in industrialized countries
 range from 0.064 to 0.44 m3/kg of refuse disposed. Annual rates of total gas (CH4 and CO2)
 generation have been reported within the range of 1.19 to 6.8 m3 gas/Mg/yr of waste disposed.
 Most of the production occurs  during  the  20 years  following  landfill closure, although
 production is most robust during the first 5 years or so.  Gas production, in gradually dwindling
 amounts, may continue indefinitely.
 Several models have been developed to predict the production rates of gas from landfills.
 Most of the models, however,  require actual  measurements of gas production in order to
 determine the values of constants for the models.
A relatively rigorous stoichiometric approach (i.e., relative to other approaches) for estimating
landfill gas production is described in Recovery,  Processing,  and Utilization  of Gas from
Sanitary Landfills [5]. This approach takes into consideration the  two major classes of material
that decompose to produce landfill gas.  The first class  consists of the easily biodegradable
                                                                                  14-3

-------
 fraction (e.g., food waste or garbage, garden debris).  The second class includes the less
 easily biodegradable fraction (e.g., paper, textiles).

 The variables mentioned in the preceding paragraph, as well as others, have an effect on the
 accuracy of models developed for predicting rates of landfill gas generation; rates of methane
 collection by a gas collection system present additional variables.  Among the variables for
 rates of methane collection are the volume of gas that escapes the collection system, the
 percentage of carbon that is converted  to methane,  and the  percentage of carbon that
 becomes a part  of microbial protoplasm or is rinsed out  in leachate.  Consequently, such
 models should be regarded only as being approximate indicators of expected gas collection
 trends.
                            :-H •'.
 Although  most  municipal  wastes  in  economically  developing  countries  have a  high
 concentration of biodegradable organic matter, the wastes  usually are not placed  in an
 impermeable (or  nearly impermeable) repository, nor are they adequately covered; thus, the
 gases readily escape from the disposal area. Also, the gas yield (on a wet-weight basis) from
 landfills in  economically developing countries may not necessarily correspond to those.from
 fills  in  industrialized countries  due  to  generally  higher  moisture content of  the waste.
 Consequently, the importance of estimating gas yields (and rates of production) based on local
 conditions cannot be overemphasized.

 14.2  Safety Aspects
The  gases generated  within the fill, if uncontrolled, will disperse and migrate  beyond the
boundary of the fill.  Accumulated gases and  uncontrolled dispersal and migration can
represent a potentially  hazardous situation due to several characteristics of the landfill gases.
The   characteristics include  flammability,  asphyxiating  properties,  and  trace  organic
concentrations.
                                                                                   14-4

-------
The slightly  positive  gas pressure usually existing within  a landfill permits gases to flow
uncontrolled  from the  fill  to areas of lower gas pressure by  convective  gas transport
Furthermore,  gases with higher concentrations  of C02  and CH< can diffuse  into regions
containing gases with  lower concentrations of these two gases.  Finally, if landfill gas
accumulates in the  fill,  the  growth of plants rooted In  the cover  can  be inhibited unless
appropriate precautions are taken.

In the absence of adequate methods of gas control, landfill  gases migrate to the atmosphere
through the landfill coven or, they can migrate laterally through the soil around the fill.  If they
reach areas from which they cannot escape (such as a building), an accumulation occurs. As
long as the  concentrations  are  relatively low, the gases  pose only a potential  nuisance.
However, when the concentration (i.e., accumulation) reaches a critical value, methane gas is
flammable and the potential of an explosion exists if the  gas  is confined and ignited (the
flammable concentration of methane in air is between 5 and 15% by volume).  At higher
concentrations, methane is flammable only when diluted  (usually by air) to within the above
range and when in the  presence of oxygen. Under these conditions, the accumulation of
methane  represents  a  hazard of fire and explosion.   Because  of the  possibility of gas
accumulation, buildings on or near landfills should not have underground structures, unless
such structures are thoroughly and continuously ventilated.

Accumulation of gases in the landfill can be avoided through the use of a porous final cover.
Migration  of  gases from the fill and the attendant hazards can be averted by  providing
pathways of high permeability in the landfill that result in controlled movement of the gases
and, ultimately, to their venting to the atmosphere. Venting of the landfill gases at the surface
of the landfill results in their dilution in the atmosphere to harmless levels (Figure 14-1).

A number of methods can be employed to provide designed pathways of high permeability to
landfill gas.  The methods include boreholes, gas wells and  trenches  within  the fill, and
                                                                                  14-5

-------
                                                                         Gas
      Figure 14-1. Dissipation of Landfill Gas Using a Porous Pathway Within the Fill

interceptor trenches or wells installed  around the borders of the fill.  An illustration of an
interceptor trench is given in Figure  14-2.   Additional  discussion concerning  venting  is
presented in Chapter 8.

Although venting the landfill gas into  the  atmosphere averts potential local  problems and
adverse impacts, this  approach contributes to the greenhouse  effect on the global scale.
Consequently, every effort should be made to collect and use the  gas or to bum the gas using
a flare system.
                                                                                   14-6

-------
           Figure 14-2. Dissipation of Landfill Gas Using an Interceptor Trench

 14.3  Basic Design of Gas Extraction Systems
 Gas recovery is instituted at landfills for two reasons. One is recovery of gas for the purpose
 of gas control, i.e., for environmental control. Methods of environmental control include flaring
 (burning)  and simple  dilution and  dispersion.   Environmental  control is  essential  for  the
 operation  of modem, large landfills.  The second reason for gas recovery is to take advantage
 of the energy content of the gas through energy recovery and utilization. Energy recovery is
desirable,  but not mandatory, for the operation of a landfill. The determination of the feasibility
of energy  recovery from landfill gas usually is based solely on a financial analysis.
                                                                                  14-7

-------
 Where the purpose for collection and recovery of landfill gas is environmental control, the
 burning of the collected gas (e.g., using flares) and natural dispersion (wherein no combustion
 is performed) are methods of control that merit consideration.  The decision with regard to
 whether or not the collected gas is burned for solely environmental reasons is a function of a
 number of considerations, including but not limited to the availability of resources for procuring
 and operating a flaring system, the capacity of the disposal site, the existence of structures
 that can confine the gas, the emphasis placed on control of gases that contribute to global
 warming, etc. The design of some simple methods of gas control is discussed in Chapter 8.

 If methane recovery and utilization is planned for a new landfill facility, certain features should
 be incorporated into its design.  Some of the requisite features are characteristic of modem
 landfill design regardless of whether or not the methane is to be recovered.
 For methane recovery, the fill must be effectively  sealed  off from the  surrounding land and
 water environment.  The steps involved  in providing such  sealing are  the  same as those
 described  throughout  .the guidance  document for leachate collection  and control,  or to
 minimize water infiltration at the surface of the landfill.  Old or existing fills should  be sealed to
 the extent economically and practically feasible.

 Gas extraction and recovery involves designing the fill such that the gases that are generated
 by the decomposition  of the wastes can  be controlled  and collected.   The  collected gases
 either can be used directly as a medium-calorific fuel, or can be processed (purified) to form a
 high-calorific fuel.  The collection of the landfill gas (i.e., mixture of  gases) is provided by a
 network (i.e., grid) of strategically spaced  wells or trenches within the fill and by constructing
each well or trench with high permeability materials through which the gas can pass easily and
enter the piping system. The gas is extracted from the wellheads by way of a piping or header
system and a suction pump is used to pull the gas from the fill through the headers [1,5,6], as
shown in Figure 14-3.
                                                                                    14-8

-------
                                             Valve box
                                             and cover
                         PVC monitoring
                         port with cap
       Gas collection header
                                        PVC lateral
                               Bentonite or concrete
Compacted soil
or refuse
                                                                 Depth varies with
                                                             t..:j site characteristics
                                PVC perforated pipe
                            Figure 14-3.  Gas Collection Well

 Proper functioning of the gas collection system is ensured through the use of blowers.  The
 blowers  are operated such that a partial  vacuum is created in the headers and collection
 system and, consequently, the gas is pulled from the landfill.  Although some gas will flow
 unassisted into the collection wells because of the slightly elevated internal  pressure of the
 landfill, the  flow rate is too low to ensure  proper collection performance.  A system without
 blowers {pumps) is called a passive system. Blowers both increase the flow  of gas from the
 landfill and  broaden the  effective landfill  area serviced by each  gas extraction well.  The
blowers can be adjusted either:  1) to pull gas from the fill and discharge it for dispersion,
flaring, or combustion; or 2) to compress  the gas to higher pressures for distribution or for
further processing.
                                                                                   14-9

-------
 The potential exists to recover gas from two general types of existing disposal sites: 1) a
-landfill not originally intended for gas recovery if the landfill used daily and final cover and has
 a surrounding soil layer (i.e., at the side  and bottom interfaces with the wastes) of low
 permeability, or 2) an open dump if the wastes from which gas is to be extracted are effectively
 sealed from the surrounding land environment and from the atmosphere. The reasons these
 situations promote the feasibility of recovery of gas are: 1) covering and sealing the wastes
 inhibits the rapid loss of landfill gas to the atmosphere or the suction of air into the landfill if
 gas is actively withdrawn, and 2) migration of landfill gas into surrounding soils is minimized if
 they are of low permeability.

 The gas extraction wells generally extend to 60 to 90% of the waste depth and are slotted over
 the bottom 50 to 66% if they are used for gas collection and use. If the wells are used solely
 for venting of the gas,  the entire length of the casing is  slotted.   To accommodate the
 settlement in  the fill, various strategies are practiced with regard to the wells.  In the United
 States, the most common practice is to plan on the  settlement and to cut out sections of the
 well pipe periodically. A less common approach is to use telescopic connections between pipe
 segments.

 The wells  are built by progressively backfilling gravel around the  gas collection pipe.  The
 backfilled gravel (or a coarse substitute) serves as a highly permeable collection zone through
which  the  gas flows into the  collection pipe for removal  from the well. The gravel area is
covered  with a gas-tight seal topped by backfilled  soil  to form  a barrier against intrusion of
external  air into the well.  Air intruding into a well (or into any part of the fill) would dilute the
collected gas  and, thereby, lower its  heating value and  complicate purification.  Moreover,
intruding air can  lead to the development of serious problems.   With  respect to dilution, the
concentration  of nitrogen in the collected gas would be increased and the quality of the gas
would  be lowered correspondingly.  Potentially more serious problems could result from the
presence of oxygen in the air introduced into the fill. The oxygen would inhibit  the activity of
                                                                                   14-10

-------
the methane-forming microorganisms.  More importantly, from a safety standpoint, oxygen
introduced into the fill might result in an explosive or combustible environment, with methane
as the fuel and oxygen as the oxidizer.

The arrangement of the gas collection wells is determined by their respective capacities, by the
characteristics of the soil cover and provisions for directing gas movement in the fill, and by the
gas production rate of the decomposing wastes. The dimensions of the fill area affected by a
well is a function of the rate of pumping.  For example, a 12-m deep fill located in California
with a gas well 6 m deep was being pumped at 2.8 m3/min.  The pressure in the waste ranged
from -5.1 cm of water at the well to less than -0.8 cm at a distance of 30.5 m from the well.
Increasing the pumping rate to 8.5 m3/min brought the respective negative pressures to -17.8
and -2.54 cm [7]. As a general rule, a well or trench can be expected to collect gas a distance
of 30 m to 40 m horizontally (and 5  m to 10 m vertically in the case of horizontal trenches),
depending on the degree of compaction of the waste, the moisture content in the fill, etc.

14.4  Use of Landfill Gas
Uses of raw (i.e., unprocessed)  landfill gas are somewhat limited. They may include domestic
heating and cooking, brick and cement  manufacture,  and industrial process heat.  For a
number of uses, landfill gas must be upgraded in order to be of feasible utility.  Upgrading is
especially essential if the gas is to be used as a fuel for an internal combustion engine, or is to
be injected into natural gas transmission lines.

In comparison  to natural  gas,  the  quality and  calorific content of raw landfill gas are
substantially less.  Moreover, its composition and other characteristics are more variable than
those of natural gas.  For example, daily measurements can be ±50% of long-term averages of
daily measurements for heating value,  moisture content, and oxygen concentration of landfill
gas. Variations can also occur on a seasonal basis.  The heating value of landfill gas typically
                                                                                 14-11

-------
 is in the range of 7,450 to 22,350 kJ/m3; whereas, the lowest heating value of natural gas is
 about 37,300 kJ/m3. In terms of moisture content, raw landfill gas can be saturated (i.e., 100%
 relative humidity), or the water content can be as low as 5%. Oxygen content varies from trace
 levels to levels that render the gas mixture potentially explosive.  In practice, explosive levels
 are seldom reached. The high concentrations of CO2 and N2 in raw landfill gas dilute the
 heating value of the CH4 in the gas mixture.  The quality of landfill gas can be increased by
 subjecting it to various levels and stages of processing.
 The uses for processed landfill gas include on-site generation of electricity and injection into a
 public utility transmission  line.  Two predominant alternatives exist for on-site generation of
 electricity from landfill gas - internal combustion engines or gas turbines.  If the gas is to be
 used in an internal combustion engine, typically it is compressed to about 33 kPa. To fuel a
 gas turbine, the gas is compressed to a much higher pressure, e.g., 100 kPa.
 Processing systems are available for removing water, CO2, and N2 from raw landfill gas, thus
 raising its heating value substantially.  Dehydration of raw landfill gas can result in about a
 10%  increase  in  heating value.  Dehydration, in combination with removal of CO2 and
 hydrogen sulfide (H2S), can  result in a heating value of 22,360 to 26,000 kJ/m3.   Among
 methods of dehydration are in-line gravity outflow; filtering; use of special solvents (e.g., glycol,
 polyethylene);  passage  through  molecular sieves  or  permaselective  membranes;  and
 subjection to heating, air cooling, and refrigerant cooling.  Of these alternatives, the use of a
 molecular sieve offers a good combination of relatively low cost and high efficiency.

The most popular process for dehydration of gas is the triethylene glycol (TEG) system.  This
system  has several  beneficial characteristics which, when taken  in total,  account for its
extensive use. The characteristics are chiefly those of the working fluid (i.e., glycols), namely,
high degree of hygroscopicity, excellent thermal and chemical stability, low vapor pressures,
and moderate cost.
                                                                                  14-12

-------
 In a TEG system, gas is compressed initially as it enters the system and bulk contaminants are
 removed also in this first stage.  Subsequently, the gas is cooled to capture and remove the
 majority of  the  moisture.    Next,  the  gas  is  passed through  a  triethylene  glycol
 absorber/separator tower where free liquids in the gas are removed as the gas flows from the
 bottom (separator section) to the top (absorber section) of the tower. In the upper part of the
 tower, the  gas is contacted with triethylene glycol on bubble trays to further remove moisture
 from the gas stream. A diagram of a TEG dehydration process is shown in Figure 14-4.
 Water, as well as two other major impurities in raw landfill gas, CO2, and H2S, can be removed
 by coupling the TEG system with a hot potassium  carbonate scrubbing system.
 Certain uses of landfill gas (e.g., space heating and household cooking) require only that H2S
                            •::$ :
 be removed from the gas.  Hydrogen sulfide can be removed by passing the raw landfill gas
 through a dry-gas scrubber that contains a mixture of  ferric oxide and wood  shavings
 (commonly termed an "iron sponge"). The removal capacity of the mixture is about 105 kg of
 sulfur/m3 mixture.  The mixture can be regenerated by exposing it to air.  The exposure of the
 mixture to  air converts the ferric sulfide formed in the scrubbing reaction  to ferric oxide and
                                              —i; -
 elemental sulfur.  A schematic diagram of an iron oxide processing system is given in Figure
 14-5.

 Several factors play a decisive role in  determining the financial feasibility of recovering and
 using landfill gas.  The more important factors are: size and location of the fill, permeability of
 cover material and surrounding soil layer, climatic conditions, and proposed  use of the gas.
 With regard to permeability of the surrounding soil layer, the  provision of an impermeable
 barrier between the landfill contents and the surrounding soil while the fill is in the design stage
is much preferred to the installation of one after the fill has been completed. If the landfill
design criteria offered in the guidance document are followed,  low permeability of cover and
surrounding soil layer should promote  the technical feasibility  of  recovery and utilization of
                                                                                 14-13

-------
       Treated gas
                                  pump drive
                   Hydraulic turbine
n -c
   V>1
   <^v|
                                                                  To pump
                                                                  drive
                                                           Expansion
                                                           turbine
                                                       *
                                                       (0
                                                     vy
                                                                          Pump
             Figure 14-4.  Schematic of a Landfill Gas Dehydration System
                            Using Triethylene Glycol (TEG)
landfill gas.  The size and location of a completed fill, or of one presently in use, governs the
quantity and rate of collection of landfill gas and the potential markets. Climatic conditions also
govern the type of markets and uses that might exist.  For example, in tropical countries, the
use of landfill gas for cooling is more probable than for heating (an exception would be the
local need for industrial process heat). In economically developing countries, the need for a
high-quality gas in order to have a market or use for it may render gas recovery and utilization
                                                                               14-14

-------
        Compressor
   Air
   Feed gas
   Steam
   Water
              I
                                      Iron
                                      oxide
                                      box
Iron
oxide
box
                                                                            Product gas
                    Figure 14-5. Schematic of an Iron Oxide Process
                     to Remove Hydrogen Sulfide from Landfill Gas
unfeasible due to the cost of processing being prohibitively high or to the lack of sufficient

technological infrastructure.  This circumstance exists as well in  economically developing

countries.


The mass of waste in the fill should be sufficient to ensure an eventual total gas output that

would have a monetary and energy value in excess of that expended on necessary departures

from conventional fill practice.   The size of the fill must be great enough to ensure gas

production over a period sufficiently long  to warrant the installation of equipment needed for

collecting, upgrading, and using the gas.
                                                                                14-15

-------
 Based on the experience had in industrialized countries, landfill gas recovery and utilization is
 not advisable for a fill that is less than 13 m deep.  Additionally, at least two million Mg of
 municipal solid waste should be in place in the disposal site [6]. It has been estimated that at
 the peak rate of generation, raw gas production from a 2 million Mg fill would be in the range of
 28 to 34 m3/min, or about 760 MkJ/day [6].

 The recovery and use of landfill gas must be carefully evaluated prior to design and installation
 of a recovery system.  Gas processing systems  can be expensive to procure and to operate,
 especially if a high-quality gas is required by the market or use.  In an economically developing
 country, a technically and financially feasible use for landfill gas might be as a fuel for steam
 generation or for an internal combustion engine (with or without an  electric generator) after a
 limited degree of cleaning.  The  high probability of high moisture contents and of corrosive
 elements in raw landfill gas and the costliness of gas transmission over long distances usually
 dictate on-site usage being more feasible than use of the gas off-site.

 14.5  Information on Number and Types of Projects Worldwide
 A number of projects have been implemented around the world to take advantage of the
 energy potential of landfill gas (LFG).  In countries within the European Economic Community,
 approximately  180 LFG utilization projects  were  reported  in 1990,  with a reported  gas
 utilization rate of 750 million m3/yr (not all facilities reported gas production) [8].  Within Latin
America, 11 LFG projects were reported in 1990 among the countries of Brazil, Colombia,  and
Chile [8].  In the United States, approximately 130 landfills collect and utilize LFG to produce
energy in some form [9]. Approximately 75% of the  landfills with gas recovery systems use
LFG to generate electricity; about  25% of the landfills sell LFG for off-site use.  The production
capacity  of the LFG electrical  generating systems ranges from 70 kW  to 50 MW.  Other
countries of the world reporting  LFG utilization projects (1990) were South Africa (2), Australia
(4), Hong Kong (1), and India (3) [8].
                                                                                 14-16

-------
References

1.    Holmes, J.R., Practical Waste Management, John Wiley and Sons, Inc., New York,
      New York, 1983.
2.    Zimmerman, R.E., G.R. Lytynyshyn, and  M.L.  Wilkey, Landfill Gas Recovery - A
      Technology Status Report, NTIS #DE84-001194, ANL/CNSV-TM-12, August 1983.
3.    Wilkey, M.L, R.E. Zimmerman, and H.R. Isaacson, Methane from Landfills: Preliminary
      Assessment Workbook, Argonne National Laboratory, Report ANL/CNSU-31,1982.
4.    Flynn,  N.W., M. Guttman, J. Hahn, and J.R. Payne, Trace Chemical Characterization of
      Pollutants Occurring in the Production of Landfill Gas from the Shoreline Regional Park
      Sanitary Landfill, Mountain View, California, prepared by Science Applications, Inc. for
      Pacific Gas and Electric Company and U.S.  Department of Energy, 1981.
5.    Ham, R.K., et al., Recovery, Processing, and Utilization of Gas from Sanitary Landfills,
      EPA-600/2-79-001 (NTIS PB293-165), U.S.  EPA, Cincinnati, Ohio, 1979.
6.    Matrecon, Inc.,  Lining  of Waste Impoundment and Disposal Facilities, SW-870 (NTIS
      PB86-192796),  U.S. EPA, Washington, DC, 1980.
7.    Diaz, L.F., G.M. Savage, and C.G. Golueke, Resource Recovery from Municipal Solid
      Wastes, CRC Press, Boca Raton, Florida, 1982.
8.    Gendelebien,  A., et al., Landfill Gas-From Environment to Energy, Commission of the
      European Communities, Brussels, Luxembourg, 1992.
9.    Berenyi, E.B. and R.N. Gould, 1994-95 Methane Recovery From Landfill Yearbook,
      Governmental Advisory Associates, Inc., New York, New York, 1995.
                                                                             14-17

-------
 Chapter 15
 Resource Recovery and Utilization

 15.1  Introduction
 For the  purpose of this chapter, resource recovery is defined as the physical recovery of
 materials from wastes for marketing as secondary materials, as sources of energy (i.e., as
 fuels), or both. Since landfill gas recovery does not involve the physical recovery of materials,
 gas recovery is excluded from this discussion and is described separately in Chapter 14.
 Resource recovery utilizes mechanical and/or manual methods of processing.

 In terms of landfill design and operation, resource recovery is a potential consideration in the
 case of a new landfill, as well as in the case of an existing disposal site that is under evaluation
 for conversion to modem landfill standards.  In the  latter case, scavenging, i.e., manual
 resource recovery, already may be practiced to one degree or another.  Where scavenging is
 practiced, the prevalent form of resource recovery  in economically developing countries is
 salvaging of materials for sale to secondary materials markets as opposed to fuel markets.
 The list of materials that may have economic value includes aluminum cans, tin cans, and
 various grades of paper and of plastic.

 The processing of wastes  at  a landfill can  occur immediately  after delivery  (or shortly
 thereafter), or after the wastes have been  buried for some time.  In the latter case (i.e.,
 processing after burial), the  method of processing commonly  is termed "landfill  mining" or
 "landfill mining and reclamation."

 The processing of wastes upon their delivery to the landfill can take several forms.  The forms
 include processing of mixed solid waste (a heterogeneous mixture of materials) and of nearly
 homogeneous waste. A nearly homogeneous waste is a mixture of types of materials (e.g.,
wood, paper) that is relatively homogeneous and that can be processed efficiently in terms of
                                                                                  15-1

-------
 yield of recyclable materials. A homogeneous mixture of waste is one that is composed of a
 high concentration of materials that have a number of similar characteristics. Construction and
 demolition debris is an example of a special waste; it can have large concentrations of wood,
 concrete, and metal.  Mixed waste, on the other hand, is a heterogeneous mixture, i.e., mixed
 wastes are composed of many types of materials, with no type(s) of material dominating the
 composition of the mixture.  Consequently, the recovery of materials from mixed waste usually
 is less efficient than recovery of the same materials from special waste.
 If resource  recovery is  designed  or practiced as a component of a landfill operation, the
 recovery  operation  should  be  designed and operated  such that it  does  not  create
 environmental or health  and safety problems.  This admonition applies regardless of whether
 the operation is mechanical, manual, or both.

 15.2  Mechanical Recovery
 As the name implies, mechanical methods of resource, recovery depend predominantly on the
 use  of mechanical equipment to process the wastes. When mechanical recovery systems are
 employed at disposal sites, they usually are simple in terms of number of pieces of equipment
 and  in terms of technology.  The reasons include:

 •      A landfill operation is dynamic, i.e., the location for discharging the waste moves about
       the site over time as portions of the fill are completed.  Equipment that is simple can be
       moved with relative ease.

•     A complex processing operation usually would require an enclosure for protection of
      the equipment from the elements and for environmental control.  Normally, a dedicated
      processing facility is used in this case, such as a transfer station or a resource recovery
      facility. A discussion of these types of facilities is outside the scope of this document.
                                                                                 15-2

-------
 At some landfills in industrialized countries,  simple mechanical processing systems typically
 employ several of the following: conveyors,  screening equipment, magnetic separators, and
 size reduction equipment (e.g., crushers, grinders, and shredders).  Existing, as well as
 historical, applications of mechanical systems to resource recovery include the following:
 •     The processing of green waste and wood waste using size reduction for the production
       of a mulch or a boiler fuel and for further processing by composting to produce a
       compost product. In some locations in the United States, size-reduced green and wood
       wastes, partially biologically stabilized, are used for daily cover.
 •     The processing of construction and  demolition debris using the operations of  size
       reduction, magnetic separation, screening,  and flotation to recover soil, aggregate,
       wood,  and metals. Potential uses for the recovered aggregate and soil include cover
       material and road construction.
 •     The recovery of steel containers from  mixed wastes using size reduction and magnetic
       separation.
 Mechanical equipment can also be employed to excavate wastes from a completed fill and to
 process the excavated wastes  for recovery  of materials. This application is termed landfill
 mining and reclamation (LFMR), as mentioned in the Introduction of this chapter. Although a
 number of reasons exist for considering or implementing LFMR, in the case of economically
 developing countries, the immediate practical  use  would be to remediate open dumpsites.
 Materials recovery and recovery of disposal volume might be secondary reasons, or reasons
 that become more feasible in the future.  From a technical standpoint, the recovery of a soil
 fraction from disposal  sites wherein the solid wastes are biologically stabilized is feasible
 through the application of simple screening systems. Thus, disposal sites that have received
 or are receiving wastes composed predominantly of uncontaminated putrescible wastes (e.g.,
those  of  domestic  origin) can  be  candidates for LFMR,  depending  on  a number of
                                                                                  15-3

-------
 considerations.  In the United States, LFMR projects have reported yields of soil fractions in
 the range of about 30 to 60%.  (Of course, a portion of the soil fraction is composed of the
 cover soil used during the construction of the fill; a component that may or may not exist in
 land  disposal sites  in developing  countries.)   Uses  of the  recovered soil include land
 development (reclamation) and landfill coven the latter material  is sometimes unaffordable or
 unavailable in some  locations.   Since the  most likely  application of LFMR in the case of
 economically developing countries is remediation, the technology is reserved for discussion in
 Chapter 17.
                                                            «
 15.3  Manual Recovery
 Methods of manual resource recovery (scavenging) use primarily human labor to process and
 recover materials from wastes as they are dumped at the disposal location. Generally, simple
 hand tools (e.g., hooked implements) are used by scavengers to facilitate  recovery of the
 recyclable  materials  from the wastes.  The  scavenging  process typically consists of four
 activities: 1) picking (i.e., recovery) of recyclable materials from discharged  loads  of waste,
 2) carrying of the captured materials (in cloth sacks or in fiber or metal  containers) from the
 dumping location to  an area reserved for accumulation and storage, 3) organization of the
 recovered materials into organized lots for the marketplace, and 4) transport of the materials to
 market.  Typical materials recovered and recycled in this way include some or combinations of
 the following: unbroken bottles; and  many types of metal, plastics, paper  products,  and
 textiles.

 15.4   Impacts of Scavenging
Scavenging can present risks and  problems to a landfill operation.  The  risks exist as a
consequence of the exposure of the scavengers to safety, health, and environmental hazards
that, in turn, are  a consequence of the proximity of the scavengers to the wastes and landfill
                                                                                  15-4

-------
equipment; the conditions may also affect the health and safety of the landfill employees. The
problems presented by scavengers to a landfill operation include interference caused by the
scavenging activity.  Scavenging activities can  prevent the efficient and timely conduct of the
landfilling of the wastes.  Scavenging oftentimes delays the timely compaction of waste and
application of the soil cover.
The hazards caused by the coexistence of scavenging and the equipment-oriented landfilling
activity increase as the number and size of the heavy equipment increase.  Consequently, in
the case of a large landfill serving a municipality, especially a large urban city, scavenging can
present significant risks, problems, and disruptions to landfill operations.
The accommodation and approval of scavenging at a landfill must be considered in terms of
the drawbacks presented in the  preceding paragraphs.  If scavenging  is allowed,  then the
scavenging activities must be properly coordinated  with  and  integrated into the  overall
operation of the landfill such that  the primary function of the landfill, i.e., the protection of the
public health and of the environment, is not compromised or jeopardized.

15.4.1    Control and Management of Scavenging
Many of the negative consequences of scavenging on landfill operations can be lessened or
even eliminated by treating  the scavenging activity as a distinct first step  in the series of steps
that compose  the overall  landfill operation.  The approach of treating the operations  of
scavenging  and  of landfilling  of wastes  as  sequential is  a  departure  from their usual
performance as essentially parallel activities.
To achieve  the distinct separation of scavenging from the  disposal operation, the optimum
arrangement is a spatial separation of the two activities.  Of course, such a separation adds to
the complexity  of a landfill operation.  For this approach, the scavenging step encompasses
two components, the second of which is essentially an activity that would be additional to
                                                                                  15-5

-------
 those of the typical parallel practice of scavenging and burial: 1) discharge of the incoming
 wastes at the scavenging portion of the disposal site, and 2) transfer of the residue remaining
 after scavenging to the burial site.
 In keeping with the goal of separating the scavenging and waste burial activities, two general
 types of systems can be defined:
 1.      Local/Moveable - The scavenging area is located nearby, but distinctly separate from,
        the working face.  Therefore, the scavenging area is moved often in order to minimize
        the burden on the  burial  operation as a consequence of the need to transfer the
        residues from the scavenging operation to the working face.
 2.      Remote/Fixed - The scavenging area is located on the landfill site but distant from the
        burial location. Consequently, the scavenging area is a permanent site.
 In the case of the Local/Moveable system configuration, the scavenging area is relatively close
 to the working face, and the transfer of wastes from the scavenging area  to the face can be
 accomplished quickly by means  of equipment that possesses a  blade  or bucket, e.g.,  a
 bulldozer.  Precautions must be taken to ensure that the two areas are not located so closely
 as to defeat the goal of separating the two activities, i.e., elimination of interference between
 the scavengers and the function of waste disposal.   This arrangement requires that the
 scavenging area be moveable.

 In the case of the Remote/Fixed system configuration, the scavenging area is remotely located
 from the working face, e.g., 1 to 2 km, and a loading system and hauling vehicles are required
 in order to efficiently transfer the post-scavenged wastes  to the working face. The rate  of
 transfer and, therefore, transfer system requirements  are  a function of the daily volume  of
wastes  received.  Suitable transfer vehicles would include dump trucks, and farm tractors and
trailers.
                                                                                   15-6

-------
A fixed scavenging site for the lifespan of the fill would be indicated if transfer by bulldozer is
not feasible.  A fixed scavenging site would be neither feasible nor advisable for a disposal site
having a relatively short lifespan.   Dedication of a fixed portion  of the disposal site to
scavenging takes on many of the characteristics and advantages of a transfer station.  For
instance, scavenging limited to a  fixed area can be sheltered from the elements (wind, rain,
etc.), and an undesired  impact upon the environment  can be avoided or minimized.  The
operation itself can be kept orderly and closely controlled, and abuses can be discouraged.
Furthermore, efficiency can be improved by including a limited amount of mechanization, e.g.,
conveyor belts or rolling equipment for loading post-scavenging wastes onto transfer vehicles.
An important benefit of this arrangement is avoidance of encounters between scavengers and
landfill equipment.  Additionally, this system allows for the provision of much needed sanitary
facilities  and  a good  working  environment for  the scavengers.    Collectively,  these
arrangements and benefits serve to stimulate an efficient and well-operated landfill.
Perhaps the  strongest objection to designating a fixed site is the fact that the added step of
loading and transferring mentioned earlier becomes a necessity. This  objection does not come
into play until the distance between the scavenging and burial sites becomes so  large that
transfer of wastes  by bulldozing  is no longer feasible.  Of course, the capital expenditure
associated with the erection of a building and introduction of  added equipment  would  be
another disadvantage.
The capacity of a disposal site is the decisive factor regarding advisability and  necessity for
dedicating a portion solely to scavenging.  In general, a capacity of  10 years or more would
justify the incorporation of a fixed scavenging area into a landfill operation.
Important factors when  managing  scavenging activities  are the relative priorities of the
scavenging and the burial activities. Burial should have precedence over scavenging since the
reason for the fill is the disposal  of wastes.  Therefore, scavenging must be managed in a
                                                                                  15-7

-------
 manner that does not unduly interfere with the main activity of the landfill site, i.e., proper
 disposal of waste.  A secondary, but nonetheless important, consideration is the impact of a
 potential loss of income to the scavengers, as well as potential losses of secondary materials
 to the local industry should the scavenging operation be operated inefficiently, ineffectively, or
 both.
 Unless carefully managed, traffic due to scavenging activities can  be  one of the  more
 disruptive interferences between scavenging and waste burial operations (disposal). Among
 the more obvious causes of disruption are the differences in physical size, number, and speed
 of vehicles associated with scavenging in comparison to other vehicles operating on or using
 the landfill property. The types of vehicles serving the scavenging activities may range from
 those as small as a non-motorized pushcart, to large vehicles used to transport the large loads
 of salvaged material. On the other hand, waste collection and haul vehicles typically surpass
 the scavenger vehicles in terms of size, weight, and speed.  In some instances, long delays in
 discharge and burial of waste are caused by the discharge and transfer to the scavengers of
 recyclable  materials stored by the collection crews on the waste collection vehicles.  Where
 scavenging is not subject to control and management, waste hauling traffic will move at a
 much faster pace than will scavenger traffic, and  the unloading and burial of waste will be
 considerably slowed both by intermingling of scavenger and other vehicular traffic and by the
 overall traffic density. Probably the best way to manage the two types of traffic is to separate
 them, i.e., use separate roadways. A disadvantage of this arrangement is the cost of the extra
 roadway.  Hence, the decision as to separation of traffic flow usually rests upon economic
feasibility.

The  extent of access by scavengers to the burial location depends  upon the degree of
separation  between the scavenging traffic and disposal traffic.  If separation is complete, the
access could range from unlimited to moderately limited.  On the other hand, if the two traffic
patterns are not separated, unlimited access by the scavengers is ruled out because  of the
                                                                                   15-8

-------
 likelihood of excessive interference with the disposal traffic.  If access is to be restricted, the
 question becomes one of which individuals  are to be excluded or have limited access.  In
 arriving at a decision,  political and social considerations oftentimes enter into the analysis and
 deliberations.

 The  activities of the scavengers should be  under  the direction of a  supervisor.   The
 supervisor's principal responsibilities are to manage and control the scavenging operation to
 promote and maintain efficiency and fairness and to minimize interference with the disposal
 operation.   Fulfilling the latter responsibility requires that the scavenging supervisor work
 dosely with the manager of the disposal operation. The latter manager should be the ultimate
 authority at the landfill  site concerning any operational  priority and  conflicts affecting the
 disposal operation (landfilling). The supervisor of the scavenging activity may be assisted by
 subordinates,  if efficiency  of  operation requires  such a provision.   Efficiency and  safety
 demand that  good housekeeping  practice  be employed and  rigorously enforced at the
 scavenging operation. Enforcement of the  practice is another of the responsibilities of the
 supervisor.

 15.4.2    Guidelines
 To manage and control  scavenging at a disposal site, a  set of policies and rules should be
 established,  those that generally apply to all participants  and those specific to the individual
 parties involved in the scavenging activity.   Among  the policies and  rules suggested for
 consideration are the following:

 •      assignment of spaces, loads of waste, etc. to individual scavengers or groups of them;

 •      implementation of procedures for the removal of salvaged materials from the site, e.g.,
       frequency and methods;

•      rules for the sale of the salvaged materials; and
                                                                                    15-9

-------
the scavengers should be provided with safety equipment, sanitary facilities, showers,
eating facilities, and  first aid supplies  (additionally, the  provision or requirement of
uniforms for the scavengers fosters orderliness, cleanliness, and worker self-esteem).
                                                                             15-10

-------
 Chapter 16
 Management and Recordkeeping

 16.1   Management Responsibilities
 The operation of a modem sanitary  landfill requires  attentive management,  monitoring,
 analysis of overall performance, and corrective action when necessary. The responsibilities
 and obligations of management can be organized into three areas:  operational, social, and
 financial.

 The operational areas that require managerial oversight include:

 •      quality assurance (i.e., conformity of the operations with the operational plan and with
       regulatory requirements),

 •      routine and daily operations,

 •      security of the site,

 •      preventive maintenance and repair, and

 •      status of equipment and provision of replacement when necessary.

 The social areas that require managerial oversight include:

 •     -public and civic relations,

 •      ensurance of the health and safety of the operational staff and of the users of the site,
       and

•      hiring and training of personnel.
                                                                                16-1

-------
 The fiscal areas that require managerial oversight include:

 •     equipment and personnel recordkeeping,

 •     operational recordkeeping,
 •     development and monitoring of budgets, and

 •     financing.
 Generally, the size of the landfill operation (i.e.,  the  magnitude of the .daily flow rate of
 disposed wastes) governs the advisability of investing the management responsibilities in a
 single individual or of entrusting them to a management team headed by a single manager or
 authority. Regardless of the management structure, the manager of the site must be qualified
 and experienced.
 The management of a large-scale landfilling operation in an economically developing country
 must consider  and address  with equal intensity the tasks of  managing personnel  and
 equipment.  In economically developing regions, labor usually is relatively abundant and wages
 are relatively low compared to the availability and cost of equipment.  This situation  is in stark
 contrast to that of industrialized countries in which labor is relatively expensive  in comparison
 to the cost of equipment.

 16.1.1    Personnel
 The number and  classifications of. personnel that are required  for a landfill  operation are
 predominantly determined by  the type and complexity of the landfill system.  Complexity is
 measured in terms of number and size of the equipment employed in the active filling
 operations, as well as in  terms of number  and types of supporting equipment and systems,
e.g., leachate and gas control  and monitoring activities and instrumentation.  In general, the
number of personnel required can be considered to be approximately proportional  to daily
                                                                                 16-2

-------
 capacity of the fill, whereas the job classifications of the required personnel are functions of
 the complexity of the landfill system, as well as the capacity of operation. Thus, the need for
 trained operators and for job classifications  for those  operators  (mechanics,  equipment
 operators, etc.) increases as the daily capacity of the operation and the complexity of the
 landfill increases.

 Few published data are available on the number of staff for operating a landfill  in developing
 countries. One reference [1] suggests that one employee is needed for every 65  Mg of solid
 wastes disposed per day. With respect to type of landfill, trench operations generally are more
 labor intensive than are area fills.
 For a  facility handling less than 50 to 70 Mg/day, one full-time position, that of an equipment
 operator, can usually monitor receipt of waste, landfill of the wastes, and performance of minor
 administrative and maintenance functions.  A landfill receiving hundreds of Mg/day would
 require  one  or  more site,supervisors, equipment  operators,  mechanics,  laborers, and
 monitoring attendants.  Some work functions can be combined among personnel in order to
 optimize productivity if the personnel are trained to perform more than one function and are
 well managed,
 The following is a discussion of the major job classifications for a landfill operation.
 16.1.1.1  Supervisor
 The responsibilities of a supervisor encompass all functions and activities of landfill operation.
 A supervisor with training in  equipment operation and maintenance lends flexibility to the
 operation of the landfill in  that the supervisor can use any non-supervisory time to operate and
maintain equipment   In  particular, for landfills  of small daily capacity, this  type  of dual
capability for the supervisor is almost a necessity in order to save costs.
                                                                                   16-3

-------
 The  supervisor should  have experience  in  landfill  operations  and  should  be fully
 knowledgeable  of the objectives and practice of landfilling, including  protection of human
 health and safety and of the environment  The supervisor should be familiar with the use,
 servicing, and maintenance of all heavy equipment that  may be used on the site.  In those
 locations that lack locally available technical expertise  (e.g., outside of large metropolitan
 areas), a site supervisor with some technical background in the basic engineering principles of
 landfill design and construction, and of environmental protection, is a good asset to ensure a
 well-operated landfill.
 16.1.1.2   Equipment Operator
 An equipment operator should be qualified and experienced in the operation and performance
 of the types of equipment used in landfill operations.  Equipment operators should be trained
 to operate a variety of equipment and to perform preventive maintenance and  minor repairs.
 Familiarity with  methods and  procedures  used in landfill operations is  also  a useful and
 worthwhile  qualification.  In remote  locations, the operators  should also be  qualified and
 experienced in major equipment repairs if at all possible, since the availability of repair services
 would be limited or non-existent.

 The availability  of qualified and experienced equipment operators will be greatest in large
 urban areas.  In-other areas, training is particularly advisable in order to ensure proper landfill
 practice and operation of the equipment.
 16.1.1.3  Monitoring Attendant
 The duties and  responsibilities  of a monitoring attendant are one  or more of the following:
 observing and recording of incoming loads  of  waste  (by number, volume, weight, etc.);
 direction of traffic within the site; facilitation of unloading of difficult loads or of freeing vehicles
stuck in mud, etc.; and enforcement of site policies and regulations  concerning ingress and
egress of individuals, vehicles, and  materials.  While sites of small daily capacity often do not
require monitors, they  usually are required at large capacity landfills in order to adequately
                                                                                    16-4

-------
 control the traffic and the unloading of waste near the working face, and  to  aid in the
 maintenance of safe conditions for the operators and the users.

 In the  case of landfills  of large daily capacity, a separate  monitoring attendant  may be
 necessary in order to monitor incoming  loads of waste for unacceptable  materials and to
 record data and information concerning the number and frequency of incoming loads, and their
 volumes and weights. If a scale is used to measure the weight  of wastes delivered to the
 landfill, a monitoring  attendant would  take on the role of a  weighscale operator, i.e.,
 weighmaster, and the attendant should be qualified and trained to measure and record the
 data.
 16.1.1.4   Skilled and Unskilled Laborer
 Laborers  engage in the physical and manual work about the landfill.  Among the many work
 activities  of laborers are: collection  of litter, installation of drainage lines,  performance of
 landscaping tasks, routine maintenance on buildings and other facilities, and  assistance to the
 monitoring attendant when a busy period of traffic occurs at the working face.
 16.1.1.5   Mechanics
 In an  economically developing country,  the uninterrupted operation  of  a landfill  oftentimes
 depends  upon  the proper functioning of  a piece of equipment for which no replacement is
 readily available nor affordable.  This situation is particularly acute at landfill operations that
 are remote from large, urban  areas.  Mechanics must  be qualified and experienced in the
 maintenance and operation of heavy equipment.

 16.1.2    Equipment
The importance of proper and uninterrupted operation of heavy equipment at a landfill in an
economically developing  country requires that  a  concerted  effort  be  placed  on  the
management of the  equipment.   A precaution against equipment failure which normally is
available to management in industrialized  nations is redundancy of equipment.  Unfortunately,
                                                                                 16-5

-------
 standby or redundant equipment is an unaffordable luxury in most economically developing
 countries. Even though manual labor usually is plentiful in economically developing countries,
 unfortunately it cannot entirely compensate for a lack of basic equipment, especially heavy
 equipment.  Thus, management must make every effort to ensure that the  equipment is
 maintained in operable condition.
 When considering options for maintaining the productivity of the equipment,  management
 should realize that the potential  financial  advantages  of  purchasing  obsolete  or used
 equipment usually are outweighed by the problems inherent in the scarcity of replacement
 parts and by the inordinately high costs of maintenance in comparison to new equipment. The
 scarcity of parts and the attendant substantial maintenance and downtime also measurably
 diminish the benefits of used equipment.
 The full potential of a piece of equipment cannot be realized without a competent and well-
 qualified operator.  Inasmuch as landfill operation is heavily dependent upon equipment, an
 efficiently functioning and environmentally sound operation depends on the realization of that
 potential. Ultimately, the competency and qualifications of the equipment operator are major
 factors in a well-managed landfill.  Ideally, the operator should  have extensive experience in
 equipment operation.   New  operators should undergo an adequate training program  by
 qualified and experienced site personnel or equipment representatives,  or should attend a
 certified training program.  In addition,  all operators should have access to operation manuals
 for the equipment.

The cost of equipment maintenance is an expensive item that can be substantially lowered by
the institution of a program of daily preventive maintenance.   Equipment maintenance is a
critical aspect of landfill operations.   Unfortunately, maintenance is a task that  often  is
overlooked, and in some cases virtually ignored. The lifespan of equipment can be optimized
by performing  periodic and thorough  preventive maintenance.  Daily, routine maintenance
                                                                                  16-6

-------
includes activities such as checking water and oil levels, lubricating moving parts, and keeping
radiators  clean.   Management  should  ensure that  maintenance  activities  are  conducted
frequently and property.

A comprehensive, daily report should be completed for each piece of equipment and be readily
accessible to management.  Daily recordkeeping is one form of assurance that maintenance is
being performed regularly.

When supplying equipment to the buyer, reputable manufacturers provide an operating and
maintenance manual that includes a list of maintenance procedures and their frequency, as
well as a suggested list of replacement parts.  Very  small jurisdictions  can  rely  on private
enterprises (contractors) for the maintenance and repair of the equipment. On  the other hand,
medium to large landfills (i.e., larger than 300 to 500 Mg/day) should consider  the retention of
a full-time mechanic on staff for performing routine maintenance and repairs.   Furthermore, in
the  interest of fostering the importance of equipment  maintenance to landfill operations,
management should insist on the provision of an adequate structure to  maintain  and repair
equipment, including, at the very least, some form of protection from  the elements and a
supply of basic tools, supplies, and spare parts.

16.2  Performance Monitoring
The operational aspects of monitoring landfill performance are described in Chapter 10.  Good
recordkeeping is essential to the monitoring and  analysis of landfill operations. Without the
maintenance of good records, it will not be possible to assess whether  or not the landfill is
meeting its performance goals or whether changes in operations are having the desired effects
on performance. Records should be maintained on the following: waste quantities, filling rate,
equipment and supplies, leachate, landfill gas, worker safety, and expenses and revenues.
                                                                                  16-7

-------
 16.2.1    Waste Quantities
 A continuous log of incoming waste quantities, either by weight (Mg) or by volume (m3), should
 be maintained for all waste types accepted at the facility. For purposes of administration, cost
 recovery, or both, it may also be necessary to record incoming loads by source or carrier.  If
 materials recovery is practiced at the facility, the quantities recycled should be recorded.  The
 actual waste quantities landfilled can then be calculated as the difference between incoming
 and recycled quantities. All quantities should  be totaled daily. Monthly and annual summaries
 should be compiled from the daily records and be reported to management.

 16.2.2    Filling Rate
 At least once a year, the filling rate should be computed by the  methods described in Chapter
 10. Depending on available resources and  on the method selected,  it  may be practical to
 perform this computation on a more frequent basis.  The relevant parameters are as follows:

 •      solid waste, by weight (Mg) or volume (m3);

 •      soil cover, by weight 
-------
 The estimate can be improved by estimating the degree of settlement of the wastes that will
 occur over time and modifying the results accordingly.

 Remaining air space is calculated as the volumetric difference between the existing landfill
 surface and the proposed final landfill contours.

 16.2.3    Leachate
 For lined facilities, the landfill operating record should include measurements of leachate
 quantities and biochemical characteristics.  The quantities of leachate generated and collected
 in the system should be recorded daily and summarized monthly and annually. (This guideline
 also applies to any leachate captured from the leak detection zone of a double-liner system.)
 Analyses of leachate quality should be performed periodically, depending on the needs of the
 treatment facility. The maintenance of a daily record of precipitation also is good management
 practice.  Correlations between precipitation and leachate quantity or quality may be evident
 when the data is plotted graphically.  For example, leachate quantities, when plotted against
 daily or monthly  precipitation, may show trends that are indicative of changes in landfilling
 operations.

 16.2.4    Landfill Gas
 Any of the possible problems listed in Chapter 10 should be documented, and corrective
 actions  described for  the landfill  operating record.   In the case  of an active  landfill gas
 collection system, the record should include data important to operation of the system, such as
 gas temperature; gas pressure (vacuum) at wellheads and control points; gas concentrations
 of Cm, CO2l and  O2; ambient air temperature; and condensate volumes (see Chapter 14).

 76.2.5    Worker Safety
Any lost-time accident or significant safety infringement should be fully reported and any
corrective measures documented.   Accident  records should  be maintained as  part of the
                                                                                  16-9

-------
 permanent landfill record and should be integrated with individual personnel files. The number
 of lost-time accidents and lost-time hours should be summarized monthly and annually. These
 data should be plotted in graphical form as a simple way to track safety performance.

 16.2.6   Accounting of Revenue
 In the final disposal sites that charge  a fee, all sources and potential sources of revenue
 should be recorded.  Records should be kept by waste type and by generator.  It is preferable
 that frequent or regular users such as municipalities and institutions not be required to make
 cash transactions.  Instead, a system  of invoicing should  be developed wherein the users
 receive a bill at a certain frequency (typically, monthly).  The bill should include, at least, the
 following information: dates of delivery, quantity and type of waste (per delivery and total for
 the reporting period), and fee (per delivery and total for the reporting period).  The total of the
 revenues is then used to balance the  costs of disposal. The development of the disposal
 costs is described in Chapter 18.

 16.3  Environmental Monitoring
 This subsection assumes that environmental monitoring is a component of the operation of the
 landfill.  The landfill operating log should include a  record of all environmental  monitoring
 activities,  including inspections,  analytical data,  and corrective measures.   Guidelines for
 environmental monitoring are presented in Chapter 10.

 16.3.1    Erosion and Sedimentation
The time, date, weather and surface conditions, and findings of all inspections of the landfill
surface, drainage, and erosion control systems, should be recorded.  The  record should also
document any maintenance and  corrective measures  such as removal of sediment deposits,
restoration of eroded slopes, and  reseeding.
                                                                                 16-10

-------
 16.3.2   Groundwater Quality
 A written record should be kept of all water quality samplings and analytical test results. An
 annual report of the analytical data should be prepared for  management in tabular form,
 including all data from previous  years for each sample  point (monitor well).  The annual
 summary should be reviewed for the purpose of identifying any groundwater quality problems
 or trends. The findings should be included in the annual report, along with a summary of the
 analytical data.

 16.3.3   Surface Water Quality
 A written record should be maintained of surface water quality in the  same manner as for
 groundwater quality.   It is recommended  that the reports on surface  water quality and
 groundwater quality be integrated and that possible interrelationships between surface water
 quality and groundwater  quality  be evaluated.   In addition  to the analytical  data, visual
 inspections  of surface waters should  be reported.  If  any restorative measures to affected
 surface waters or wetlands are indicated or implemented, the findings and actions should be
 included in the record.

 16.3.4   Air Quality and Gas Migration
 All complaints of obnoxious or offensive odors should be recorded, as well as any corrective
 measures taken.   Routine and  periodic monitoring  for landfill gas  migration should be
 performed, as described in Chapter  10, and all field measurements recorded.  Any corrective
 actions taken to reduce or eliminate gas migration at structures or  at the landfill  boundary
 should be noted in the record. A corrective action plan should be developed where landfill gas
concentrations exceed the following limits:

•      100% of the lower explosive  limit (LEL) at the property boundary of the landfill facility,
       and
                                                                                16-11

-------
•     25% of the LEL in any structure within the landfill facility or any off-site structures
      included in the monitoring program.

At landfills that have  active gas collection  systems and monitoring probes at the landfill
perimeter, the measurements of CH4, CO2> and 02  concentrations should be made and
recorded.  These data are important in assessing the performance of the gas extraction and
control system.

Reference
1.    Flintoff, F., Management of Solid Wastes in Developing  Countries,  WHO Regional
      Publications, South-East Asia Series No. 1, New Delhi, India, 1976.
                                                                               16-12

-------
 Chapter 17
 Closure, Post-Closure, and Corrective Action

 17.1  Introduction
 Landfill closure implies the completion or cessation of filling  operations; solid waste is no
 longer accepted at the facility for disposal and, therefore, it must be directed to another
 disposal facility.  However, it is possible that an operation related to solid waste management,
 such as materials recovery or a transfer station operation, might be implemented or continued
 at the site as long as disposal of the waste residues from the operations occurred off-site.

 In the simplest terms, landfill closure refers to the period of time when the filling operation has
 ceased and the fill is "capped" with a final cover system.  The period of time during which the
 fill subsequently is  maintained and monitored for an indefinite length of time is referred to as
 the  post-closure period.   However,  in practice, landfill closure and post-closure include the
 conduct of a number of activities.  The activities are listed below and are broadly categorized
 into closure and post-closure phases:
 Closure
 •      cessation of waste delivery for disposal by burial at the landfill;

 •      preparation of the site (preparatory grading) to receive the final cover system or cap;

 •      installation of the final cover system;

 •      provisions for gas collection and control;

 •      improvements or repairs to drainage systems, erosion control features, access roads,
       etc.;

•      restoration of disturbed peripheral areas;
                                                                                   17-1

-------
 Post-closure
 •     operation and maintenance of systems for the following, including:
       *  cover system,
       *  leachate management (including liner integrity),
       *  gas management,
       *  erosion and sedimentation control,
       *  surface water management, and
       *  site access and security;
 •     environmental monitoring; and
 •     special provisions for use of the site.
 Closure arid post-closure care are important activities in the lifecycle of a landfill because they
 complete the  requirements for environmental management of the facility.  Generally, post-
 closure care should continue until such time as the solid waste has stabilized to a level at
 which it no  longer is a hazard  to public health and safety or to environmental quality. The
 ultimate duration of post-closure care is not known beforehand, and it will be specific to each
 site.  In the United States, a post-closure maintenance and  monitoring period of at least 30
 years is the norm.  The costs of closure and post-closure can be very large and should be
 adequately accounted for in the planning and fiscal management of a landfill.

 17.2  Closure Plan
The closure of any landfill should be performed  in accordance  with a prepared  plan.  The
purpose of the closure plan is to give clear guidance and procedures in order that:

•      the landfill is closed according to applicable regulations;
                                                                                   17-2

-------
•      appropriate controls are in place for the management of leachate, landfill gas, and
       surface drainage; and

•      the approved final land use is achieved.

Landfill closure requires substantial planning and preparation. A number of studies are likely
to be needed before implementing closure, the timing and content of which will depend on the
particular circumstances of the site.

 17.2.1    Planning Considerations
The closure of a landfill impacts the overall solid waste management plan for the service area.
Expansion of an  existing landfill sometimes is feasible to accommodate future  solid waste
disposal needs.   But at some point in time,  an  alternate disposal facility will be required.
Proper planning therefore  entails: 1) the development of a detailed closure plan before the
landfill  reaches capacity, and 2) provision of  an alternate disposal facility by the time the
dosing landfill shuts its gates.

Depending on the complexity of the situation, preparation of a closure plan can take from
several months to more than one year to complete.  If environmental studies  are  needed
before the initiation of engineering for closure plans and specifications, the entire  process can
extend to several years. In the case of planning and developing an alternate facility, a period
of five years or more from inception to implementation is considered to be realistic in the
United States - especially if site selection and scientific investigations are yet to be conducted.

Planning for  landfill closure requires careful consideration of waste quantities in relation  to
available  capacity.   In Chapter  10,  the importance of monitoring the  filling  rate was
emphasized.    This information should  be used to  periodically  estimate  and adjust the
anticipated date when the landfill will reach capacity and, therefore, be closed. As the landfill
approaches its limit of capacity, the specific date of closure may shift, so the planning for  an
                                                                                   17-3

-------
 alternate facility should provide some flexibility with respect to timing. When the landfill finally
 does close, a sign should be posted stating this fact and providing instructions for using; the
 alternate disposal facility.

 77.2.2    New Landfill vs. Existing Landfill
 The closure plan should be regarded as integral to the overall  plan for developing and
 managing the landfill.  For any proposed (new) landfill, the closure plan should be a part of the
 original landfill design.  The design engineer should anticipate the manner in which systems
 providing service during the active life of the landfill (e.g., drainage or gas  management
 systems) will  be integrated  into the closure design or replaced at the time of closure.  An
 example would be channeling  of  runoff  from the landfill cap  to  a  previously constructed
 sediment basin.
 In the case of an existing landfill, either active or inactive, a closure plan may not have been
 considered nor prepared.  Environmental monitoring at such facilities also may not have been
 conducted, or the data may be lacking or deficient.  Under these types of circumstances, the
 site conditions must be characterized before the closure design can be developed because
 any closure plan must be designed to minimize environmental impacts and, possibly, to restore
 the affected resources. The required scientific investigations (hydrogeologic, hydrologic, etc.)
 should form the  basis of the closure plan design.  The  procedures for closing  an existing
 landfill are considered further in Subsection 17.6.

 17.2.3   Elements of a Closure Plan
The following elements are essential to closure plan development:

•      hydrogeologic report, describing the physical relationships between the landfill and the
       hydrogeology of the site and any observed effects on groundwater quality;
                                                                                    17-4

-------
•      final site topographic plan, showing finished contours of the landfill and adjoining area,
       and important planimetric features such as streams, wooded areas, roads, buildings,
       and boundary lines;

•      final cover system design, including plans and specifications for all system components
       and details of construction;

•      sources of final cover materials, both earthen and synthetic (where applicable);

•      final landscaping or site redevelopment plan, including construction specifications and
       details;

•      preparatory grading plan, describing the requirements for filling and grading to achieve
       the  desired  landfill  contours  and the required degree  of  surface  preparation for
       subsequent placement of the final cover system;

•      operating  plan, to be applied during the active and final stages of the landfill  to show
       how closure  construction will  be phased  (not  applicable to smaller landfills where
       closure construction will be performed all at once);

•      surface water management plan, including design of  surface drainage systems and
       erosion and sedimentation controls;

•      groundwater  management plan,  for  modification of the natural water table and
       groundwater flow paths, where necessary, to mitigate impacts from the landfill;

•      leachate management plan, required for lined landfills and for unlined landfills needing
       remediation of contaminated groundwater;

•       landfill gas management plan;
                                                                                  17-5

-------
 •      environmental monitoring plan for groundwater, surface water, gas migration, erosion,
       and sedimentation;
 •      cost estimates for closure construction and post-closure care (i.e., long-term operation,
       maintenance, and monitoring); and
 •      implementation schedule, notification procedures, and regulatory review.
 Not all of these elements will be required for every site; however, most of the listed items will
 be pertinent to most landfill closures.

 17.2.4   Implementation
 The entity responsible  for  closing  a landfill must  provide  some  means of procuring  the
 necessary labor,  materials, and equipment and  must  have  the financial  and technical
 resources to complete the work. In certain cases, the entity itself may provide the workforce
 and purchase construction materials directly for all or a portion of the project.  Larger entities
 may also have in-house technical staff  who can be called upon to oversee construction to
 ensure that  the work  is  performed in  conformance to the design engineer's plans and
 specifications. It is more likely, however, that larger and more complex landfill closures would
 be implemented using the resources of private construction contractors and technical experts,
 including  testing laboratories, construction managers, and resident engineers.  The resident
 engineer  on  a project typically would be  a representative from the firm that prepared the
 closure design.

 Even if the responsible entity uses its own  personnel and equipment for all construction asso-
ciated with closure, there may be major portions of the work that require the expertise of spe-
cialty contractors.  A prime example would be any landfill cap that employs a geomembrane
liner.  The installation of a geomembrane liner must be performed by skilled workers using
special equipment and  testing  procedures to  make the required  field seams.  If the  liner
                                                                                   17-6

-------
warranty is to remain valid, generally these installations  must be  performed by  factory-
authorized workers in strict adherence to the manufacturer's recommendations.

Other specialized services for landfill closure might include surveying,  well drilling, installation
and startup of landfill gas equipment, and geotechnical testing of materials.

For the  most part, the closure construction  will resemble other types of civil  engineering
projects  in which large quantities of earth materials are excavated, hauled, placed, graded,
and compacted. The construction should proceed in accordance with the engineer's plans and
specifications.  However,  minor adjustments to closure grades may be made in the field as
long as  minimum and maximum slope criteria and drainage design  requirements are met.
Critical elements of the work,  particularly the installation of the final cover system, should
                            9:
conform  to the standards established under a quality assurance program (see Chapter 8).
Conventional methods of construction  management generally are applicable.   Where large
quantities of earth materials are to be imported, the scheduling of deliveries will be important to
the progress of the work.  The impact of truck traffic on neighboring areas and transportation
routes must also be considered. Where special materials such as geosynthetics  are required
for the project, their availability and timely shipment from the vendor to the site will be essential
to maintaining the project schedule.

The single most important factor in the schedule  is likely to be the weather. Clay liners and
geomembrane liners, in particular, can  be installed only under certain conditions. As a rule,
construction activities should be avoided during the wet and cold seasons.  Excessively hot
periods also present problems for construction.
                                                                                  17-7

-------
 17.3  Post-Closure Plan
 A post-closure plan is needed to ensure the long-term integrity of the closed landfill. This type
 of plan contains elements that relate to operation, maintenance, and monitoring of the various
 components of the closed facility.  The typical elements of a post-closure plan include:

 •     maintenance of the landfill surface and vegetation cover, including restoration of
       eroded areas, reseeding, regrading of settled areas, and periodic cutting and mowing;

 •     maintenance of drainage channels, drainage control structures, sediment basins, etc.;

 •     operation and maintenance of leachate management facilities (including liners), where
       applicable;

 •     operation and maintenance of gas control/recovery facilities, where applicable;

 •     surface water monitoring program;

 •     groundwater monitoring program;

 •     landfill gas (migration) monitoring program;

 •     cost estimates and financing options for implementation of the post-closure plan; and

 •     deed  clause changes,  land  use  restrictions, and  zoning  restrictions (commonly
       encountered in the United States,  but may also be  relevant to landfill closures in some
       economically developing countries).

The post-closure plan should take effect immediately following closure construction and should
continue for an unknown period of years  until regulatory authorities have determined that the
landfill no  longer represents a significant threat to human health and safety and to  the
environment.
                                                                                   17-8

-------
17.4  Costs of Closure and Post-Closure
The costs of closure and post-closure will vary from  site to site, but normally represent a
substantial percentage of the total cost of landfilling.  In the United States, the capital costs of
landfill closure may exceed $200,000/ha. To these costs must be added the present worth of
post-closure care, which can approach, or even exceed, the costs of closure construction. The
variability of post-closure costs  is particularly large.   A  site  that  requires operation and
maintenance of leachate and  gas management facilities will have  far greater post-closure
costs than one  requiring  only maintenance of the landfill cap and occasional environmental
monitoring.

It is important to recognize that the costs of closure and post-closure will be incurred without a
self-sustaining revenue stream (unlike an  operating  landfill, which can  generate revenue
through tipping fees).  The goal of landfill administrators, therefore, should be to capture the
necessary funds for closure and post-closure in advance,  during the active life of a landfill.
This is appropriately done through the tipping fee structure, so that the users of the landfill are
the ones who pay for its closure.  Fees will need to be adjusted from time to time to reflect the
most current estimates of  closure and post-closure costs.

In fact, an analysis of closure and post-closure costs should be performed during the original
planning  of  a landfill and included in the  project's  cost estimates that accompany the
construction documents. The cost analysis should include:

•      capital costs of closure;

•      post-closure costs for operation, maintenance, and monitoring; and

•       projected cash flow from the date of closure through the end of the post-closure period
       (assume 30 years,  minimum).
                                                                                   17-9

-------
The cost estimates should be developed to a level of accuracy comparable to other, similar
engineering projects. Possible information sources available to the estimator are:

•      owners/operators of other landfills,

•      contractors who have performed this type of work,

•      cost estimating handbooks, and

•      existing cost files of the owner/operator.

Cost estimates typically are derived using a number of different sources and methods for any
given  project.   Estimates  may  be  constructed from  consideration of labor, material, and
equipment costs for each component of the work.  In evaluating future costs, values must be
adjusted for inflation as well as for accrued interest on accumulated funds. For an operating
landfill, collected  tipping  fees should  be sufficient to cover  current debt retirement and
operating costs, plus  all  estimated  future costs, with a modest additional allowance for
contingencies.  However, for an existing landfill that has not previously included closure costs
in its fee structure, it may be impractical to recover all  such costs through tipping fees. (The
fees could be exorbitant if the time to closure is relatively short.)  In such instances, other cost
recovery mechanisms, such as general taxation,  must be found  to supplement tipping fee
revenues.

17.5   Site Use/Development Issues
Closed landfills are a potential resource, as well as a potential source of major problems. They
are a potential resource because, due to their open land area,  they may be  put to beneficial
use. The potential source of problems is represented by the contents in the fill, as well as the
potential of hazards from the wastes  extending beyond the boundary of the landfill site.  The
major limitations that closed landfills bring to site redevelopment are:
                                                                                 17-10

-------
 •      the need to preserve the integrity of the landfill cap;

 •      the hazards of landfill gas; and

 •      the  probability of differential  settlement,  which can  result in  structural damage to
       buildings on the landfill.

 The extent of these  limitations will depend on several factors, including the types of waste
 landfilled, age of the landfill, degree of compaction, and climate.  In general, relatively new
 landfills  showing substantial methane generation and continuing settlement will be  poor
 candidates for reuse. Older landfills, which have achieved relative stability in terms of gas
 generation and waste consolidation, will be more viable for redevelopment.

 Despite  the limitations and risks noted above, many closed landfill sites have been used for
 various functions - some with success and others with unfortunate consequences.  Past uses
 have included:

 •      passive recreation areas or open space - parks, green belts;

 •      active recreation uses - athletic fields, golf courses;

 •      commercial development - storage areas, parking lots, lightweight metal buildings; and

 •      residential development - conventional housing, apartments.

 Because of the explosion hazard that results from the accumulation of landfill gas in enclosed
 spaces, residential housing and commercial office buildings should not be considered except
for completely stabilized landfills.  Even then, particular caution must be exercised in providing
for gas ventilation, gas monitoring, and  proper foundation design.  Because they are  safer
alternatives,  passive  or active   recreation areas  are  more  likely  applications  for the
redevelopment of landfill sites.
                                                                                  17-11

-------
 Agricultural uses may also be feasible, but the quality of the topsoil and subsoil layers of the
 landfill cap may not be conducive to productive crop yields.  Irrigation in many, cases would be
 impractical, and the additional water burden might compromise the performance of the final
 cover system.
 The following is a summary of basic guidelines for planning the post-closure use of a landfill
 site:
 1.     The major issues to be considered in the reuse of landfill sites are:
       *      hazards of methane accumulation in confined spaces (explosion potential),
       *      production of malodorous gases,
       *      differential settlement,
       *      low load-bearing capacity of landfills, and
       *      public acceptance.
 2.     The safest approach is  to wait until the  landfill mass has achieved  complete
       biochemical and structural stability. A substantial time duration may  be required to
       reach a degree of stability that is necessary for certain types of uses.

 3.     In all cases, site reuse must be designed to preserve the  integrity and function of all
       landfill systems - especially the cap and bottom liner.

4.     End uses that do not require construction of buildings pose less risk than those uses
       that involve construction of buildings on a completed fill. Relatively low-risk land uses
       include recreational open spaces, parks, golf courses, and agriculture.
                                                                                  17-12

-------
5.     Any recreational use of a landfill, such as a park or playing field, must ensure that gas
       emissions are either properly controlled or sufficiently diminished or diffused so as to
       pose no significant risk of explosion or hazard to human health and safety.
6.     Although landfill gas may not always present a hazard to public health or safety, it can
       stress vegetation growing on the landfill surface.
7.     Land uses that require irrigation have the potential to increase leachate generation and
       should be given careful consideration if leachate management is a problem.
8.     A closed landfill represents potentially valuable property, especially in urban areas.
9.     The owner may wish to develop the property with some type of building construction, as
       opposed  to  simple use as open space.    However, construction on landfills  is
       problematic for the following reasons:
       *      the low load-bearing capacity of solid waste limits foundation loads to less  than
              25to40kN/m2;
       *      solid waste typically will settle 10 to 30% of its original volume due to settlement;
              and
       *      induced loads will increase, in many cases, the degree and rate of settlement.

10.    Special design techniques are  available to reduce or overcome the effects of landfill
                              -s>
       settlement. The most reliable  method is to drive pilings through the waste into  solid
       geologic  material  underneath the landfill.   However, steel  and  concrete pilings are
       subject to degradation from chemicals in the refuse.
11.    If the landfill has a bottom liner and leachate collection system, pilings will disrupt them.
                                                                                 17-13

-------
 12.    Pilings can also damage the final cover system of a landfill.  Consideration must be
       given to maintaining a good seal around piling penetrations so as to prevent water
       infiltration and the unwanted venting of gas.
 13.    Differential settlement can also affect the physical integrity and alignment of utilities -
       electric, water, sewer, and gas lines - installed on or below the landfill surface.
 14.    Any excavations into the landfill must be done with caution, since such work may
       encounter potentially odorous (sometimes, toxic) gases and explosive conditions. Also,
       slopes around excavations may be unstable.
 15.    Any structure built on a landfill must be designed to  prevent gas  accumulation in
       enclosed spaces and to include provisions for monitoring  the presence of gas.

 17.6  Closure of Dumps/Corrective Action

 17.6.1     General
 A dump is an uncontrolled refuse disposal area in which the waste is placed on or into the
 ground  without regard for modem sanitary landfill  procedures.    Improperly designed or
 operated landfills  may have many of the characteristics of a dump.  In either case, there are
 likely to be adverse environmental impacts from improper land disposal  of waste.  This
 subsection of the guidance document discusses problem identification, data acquisition, and
 remedial alternatives for mitigating undesirable impacts resulting from improper practices of
 land disposal. The guidance also applies to correction of problems that may occur at fills that
 are designed, operated, and closed as part of a modem landfill project but at which adverse
 environmental impacts occur despite the best of intentions.

Open dump sites are by definition uncontrolled or poorly controlled operations.  The sites were
not selected through the conduct of a rigorous process of analysis, and they are not or have
                                                                                17-14

-------
not been operated in an environmentally safe manner.  Compounding the problem, dumps
may be located near residential and commercial developments, sensitive environmental areas,
or both. As a consequence, open dumps can and do represent unacceptable risks to humans
and to the environment.
The typical dump is characterized by all or most of the following conditions:
•      poor site selection;
•      no order, no plans;
•      abundance of physical hazards;
•      uncontrolled scavenging;
•      no daily cover,
•      no intermediate or final cover;
•      little, if any, compaction;
•      no site drainage or erosion control;
•      no leachate management;

•      no landfill gas management;

•      fires;
•      presence of disease carriers; and

•      foraging by animals.
                                                                               17-15

-------
 In short,  the  site and operation have so  many shortcomings and problems  that the only
 recourse  may be to close it, remediate it,  and replace it with a disposal facility that meets
 modem engineering standards for landfills.

 17.6.2    Procedures for Corrective Action
 Because  of the variable nature of dumps, the specific procedures for closure and mitigation of
 impacts will differ  from  site to  site.   In the simplest case,  a small site might be readily
 excavated and all the material hauled to an approved landfill, such as in the case of illegal
 dumps characteristic of many communities in economically developing countries.- In the worst
 case,  the situation  might require an expensive capping system plus extensive measures for
 leachate and gas management.

 Whatever the case, the methods and decisions surrounding closure or corrective action should
 be based on accepted engineering principles.  The challenge will be in finding solutions that
 satisfy the basic  criteria for environmental protection while  also heeding political realities and
 economic constraints.  Adaptation and  innovation will play  important roles in formulating
 workable  solutions.   However,  the general methodology  will be  the  same in each case,
 involving the following steps:

 1.     problem identification/data acquisition,

 2.     evaluation of alternatives, and

 3.     plan selection.
 17.6.2.1  Problem Identification/Data Acquisition
 Before undertaking  any corrective action,  it  is imperative to have a thorough understanding of
the site and its surrounding environment.  For example, specific information on the waste types
and  existing groundwater  quality  would  be needed before  remedial alternatives could be
considered. In all but the simplest cases of dump closure,  substantial amounts of data on the
                                                                                  17-16

-------
landfill operation and its environment will be required to characterize the site and to define the
extent of the problem.  If no data are available, as is often the case, the effort to collect the
necessary information can be time-consuming and expensive.  Typical data requirements for
corrective action are listed in Table 17-1.  All or most of this information will be needed for the
closure and remediation of all but the simplest dump sites.
The acquisition of data  may be an iterative process. After the initial phase of data gathering,
additional  data requirements  may become  apparent.   For example, specific data  may be
needed to support the evaluation of a particular remedial alternative being considered.  Once
the essential data have been collected,  it should  be  possible to define the magnitude  and
extent of the problem.
17.6.2.2   Evaluation of Alternatives
After defining the problem, the  next step is to develop conceptual ideas  or alternatives for
correction  of the problem.  Each alternative will actually  be  a series of connected actions
leading to a desired result.  To illustrate:
                                   .,(.
Alternative A:  Excavate the refuse and contaminated soil, and dispose of these materials at
              the new landfill. Backfill the excavation and reclaim the site for recreational use.

Alternative B:  Cap the site to reduce leachate generation and continue to monitor the site for
              impacts to groundwater.  Install security measures to exclude public entry.

Specific alternatives may be tied to  particular technologies or variations in technology.  For
example, in the case of landfill capping, one alternative  might rely on a local soil material for
construction of the barrier layer,  while a second alternative would use a geosynthetic material
for this purpose.  As another example,  ieachate treatment might  be accomplished using
different site-built or commercially available treatment processes.
                                                                                 17-17

-------
             Table 17-1. Typical Data Requirements for Corrective Action
Site Location
    •  Topography
    •  Proximity to population centers
    •  Proximity to surface water
    •  Site access
    *  Site size
    •  Areas of contamination
Climatic Information
    •  Rainfall - maximum, minimum, average, number of events, intensity
    •  Temperature - maximum, minimum, average
    •  Evapotranspiration data
Geologic, Geochemical, and Hydrogeologic Information
    •  Geologic setting and generalized soil profiles
    •  Soil physical and chemical characteristics
    •  Depth of bedrock
    •  Depth of groundwater and aquifers
    •  Existence of perched zones
    •  Groundwater flow patterns and volume
    •  Existing monitoring well locations and installation procedures
    •  Groundwater quality test results and testing frequency
Waste Characterization and Disposal Practices
    •  Types, characteristics, and quantities of waste present
    •  Variability of wastes within the site
    •  Fill methods
    •  Fill thickness
    •  Cover materials and vegetation
    •  Period of time site was active
    •  Period of time since the last waste was placed
Other Information
    •   Definition of current contamination - groundwater, surface water, leachate
       production, soil contamination, migration
    •   Types of studies performed (by whom)
    •   Corrective actions previously taken (if any)
                                                                               17-18

-------
Once the available alternatives have been identified and described, they should be developed
further by listing their advantages and disadvantages and their approximate costs.  Conceptual
cost estimates for each alternative should show both capital and operating costs. It should be
remembered that operating costs should include the long-term maintenance and monitoring
costs of post-closure. In many instances, the operating or long-term costs may exceed capital
costs.  So that cost differences between alternatives are fairly considered, it will be useful to
express capital and  operating costs as a combined present worth.  The calculation of present
worth should consider both the rate of inflation and the cost of borrowed money.
A range of other factors needs  to  be considered in the evaluation  and comparison of
alternatives. The following is a list of important evaluation criteria:

•     technical feasibility,

•     capital and operating costs,

•     reliability/history of previous applications/risks,

•     short- and long-term environmental effects,

•     construction impacts,

•     ability to reuse site,

•      secondary economic impacts,

•      compliance with regulatory standards, and

•      aesthetic factors.

This list is not intended to be all-inclusive.  Depending on the situation, other criteria may also
be important to  corrective action at a  site.  In cases where numerous alternatives may be
                                                                                 17-19

-------
 applicable, it would be most efficient to perform a brief evaluation early in the process to
 identify a shortlist of better alternatives.  Detailed evaluations would then be performed on the
 smaller number of alternatives having the greatest probability of success.
 17.6.2.3   Plan Selection
 The selected alternative forms the basis of a remedial action plan.  Plan selection does not
 imply that the best alternative will always be chosen.   In many cases, economic constraints
 may lead to a solution that is less than ideal - one  in which the degree of environmental
 remediation is less than the desired ideal.  Each situation will be unique and will impose its
 own set of practical limitations. The goal in selecting a plan should be to maximize benefits to
 human health and the environment within the framework of those limitations.

 As indicated, economic realities will factor heavily in the decision-making. It will be important to
 establish  the available level and sources of funding for any corrective action.   Once the
 "affordable" limit  is known, the practical options for corrective action are  likely to be clear.
 Careful consideration of capital vs. operating costs will be necessary, as will the sources and
 timing of funds to  cover those  costs.   In an  economically developing country,  it may  be
 unrealistic to depend on future commitment of funds to implement a plan that would have high
 operating costs over a period of many years.

 It is common practice  to document the plan selection and the process  that led  up to it -
 problem identification,  data acquisition, and  evaluation of alternatives -  in a feasibility study
 report.  The report typically represents the cumulative effort of the many contributors and
 decision-makers.  It serves  to validate, and provides a public  record of,  the  plan  selection
 process.

 17.6.3    Overview of Issues and Alternatives
The issues concerning dumps and poorly operated or abandoned land  disposal  sites  are
virtually the same as those for new and properly performing landfills.  That is, the same types
                                                                                  17-20

-------
 of environmental controls ultimately are needed to protect land, water, and air quality, as well
 as the health and safety of human populations.   The environmental controls and corrective
 actions necessary and available for remediating uncontrolled disposal sites can be categorized
 as follows:

 •      control of surface water run-on,
 •      control of erosion and sedimentation,
 •      control of leachate generation and migration,
 •      management of landfill gas, and
 •      collection/consolidation/relocation of waste.
 The following is a brief review of causes, effects, and corrective action alternatives for each
 category of controls. For convenience, the description of alternatives is presented in tabular
 form.
 17.6.3.1   Control of Surface Water Run-on
 The flow of surface water onto a waste disposal site can occur as a result of: 1) flooding,
 2) improper siting within a natural drainage way, or 3) failure of run-on diversion channels. The
 possible consequences of run-on include:

 •      an increase in leachate generation,
 •      contamination of downstream water resources,

•      erosion of the landfill cover (if originally present) and exposure of the refuse,
•      dispersion of refuse into bodies of water and populated areas, and

•      damage to access roads and other infrastructure.
                                                                                  17-21

-------
 Alternatives available for correcting run-on include diversion structures and detention/retention

 basins, as described in Table 17-2,                                      	

      Table 17-2. Corrective Action Alternatives for Control of Surface Water Run-on
  Technique
Functions/Description
Applications/Restrictions
  Diversion
  Structures
   Located upslope of landfill
   Divert surface runoff around landfill
   via dikes, channels, etc.
   Divert flow through solid waste via
   culverts only as a last resort, where
   diversion around landfill is not
   feasible
   For landfills subject to flooding or
   run-on from other sources
   Most applicable for small
   watershed
   Should be designed for 100-year
   storm since failure could lead to
   catastrophic environmental
   damage        	
  Detention/
  Retention
  Basins
   Located upslope of landfill
   Detention basins attenuate peak
   flow rates to prevent
   unmanageable flow rates
   downstream
   Retention basins prevent any
   downstream runoff
   For landfills subject to run-on
   from upstream drainage
   Periodic maintenance of basins
   required to maintain their
   efficiency
   Retention basins require high
   evaporation rates or highly
   permeable substrate to allow
   seepage (may be undesirable if
   effect on water table would
   increase leachate generation in
   landfill)
 17.6.3.2  Control of Erosion and Sedimentation
 Erosion of drainage channels and slopes is a common problem,  even at managed landfills.

 The problem may be especially acute, therefore, at an uncontrolled disposal site.  If erosion is

 not controlled, it may degrade any landfill soil cover that is present,  thereby increasing the

 amount of infiltration into the landfill and the quantity of leachate generated. Because erosion

 may lead to exposure of the waste, additional contamination can occur.

 In more severe cases of erosion, sediment may be transported off-site, causing degradation of

water quality in the receiving waters.  If sedimentation is heavy, the affected water bodies or
                                                                                  17-22

-------
wetlands may be permanently damaged. Alternatives for correcting erosion control problems
are presented in Table 17-3.
17.6.3.3  Control of Leachate Generation and Migration
In a landfill or dump, leachate is generated by two primary routes: 1) passage of infiltrating
water from  the surface through the waste, and 2) contact between  the  buried refuse and
subsurface sources of water. The first of these pathways occurs to varying degrees at all sites
but will be of greater consequence to sites where precipitation is high  and  the cover over the
waste is relatively permeable or lacking entirely. The second pathway is  applicable to sites
where the refuse was placed either in direct contact with water or below the  groundwater table.
This is commonly the situation in swampy areas that have been filled  to reclaim the area for
some other purpose.

Leachate generation generally is a difficult problem to solve. Most sites do not have provisions
for controlling the movement of groundwater through the waste or for containing the  leachate
that is generated. As a result, the leachate is free to escape the site and contaminate the
groundwater resource. Where groundwater controls and/or leachate collection and treatment
are necessary, the costs can be prohibitive. In the case of buried refuse that is not in contact
with groundwater, leachate formation usually can be mitigated with a  property designed and
constructed landfill cap. For a developing country, the costs of capping are more likely to be
manageable than costs of leachate collection and treatment.

The  alternatives available  for  controlling leachate  generation  and leachate migration  are
summarized in Tables 17-4 and 17-5, respectively.
17.6.3.4  Management of Landfill Gas
At most sites where organic  solid waste has been buried, landfill gas is generated in  sufficient
quantities to present potential problems. Often, the gas rises through the landfill and vents
harmlessly into the atmosphere.  However, if anything impedes the flow of  gas to the surface,
                                                                                 17-23

-------
       Table 17-3.  Corrective Action Alternatives for Erosion Control Problems
Technique
Functions/Description
Applications/Restrictions
Channel Lining
   Prevents excessive erosion
   Lining may be grass, rock,
   erosion control mats, asphalt,
   or other anthropogenic
   materials
   For unlined drainage channels
   experiencing erosion of bottom
   and/or sides
   Some techniques are expensive
   Larger channels require more
   resistant lining	
Channel Grade
Control
   Reduces flow velocity to non-
   erosive levels
   Check dams, drop structures,
   and erosion checks may be
   used
   For natural or artificial channels
   experiencing high flow velocities
   due to steep gradients
   Sedimentation and flooding
   impacts should be evaluated
   when check dams are employed
   Drop structures may be costly
   for greater flow rates and depths
   of drop
Channel
Realignment
   Alters channel alignment to
   improve stability of channel
   bottom and banks
   For natural channels
   experiencing erosion from .
   changes to watershed or other
   cause
   May require extensive earthwork
   if realignment is required for
   long length of stream
   Effects of realignment must be
   carefully modeled and evaluated
Energy
Dissipators
   Reduce flow velocity and
   energy of discharges from
   channels, culverts, and
   ditches
   Level spreaders, hydraulic
   jumps, discharge aprons, and
   drop inlets may be used
   For outlets discharging on
   erodible soil
   Discharge from energy
   dissipator must be onto
   stabilized surface
   Hydraulic jump is only effective
   when inlet flow is supercritical
   Drop structure is used at head
   of channel or culvert to reduce
   hydraulic gradient
                        (continued)
                                                                               17-24

-------
    Table 17-3.  Corrective Action Alternatives for Erosion Control Problems (cont)
Technique
Functions/Description
Applications/Restrictions
Detention/
Retention
Basins
(Sediment
Basins)
   Attenuate peak flow rates
   from watershed
   Allow controlled release of
   water to prevent excessive
   flows through drainage ways
   Prevent transport of sediment
   to downstream locations
   For areas subject to erosion
   from high flows during major
   storm events
   Periodic removal of sediment is
   required to maintain design
   efficiency of basin
   Most appropriate where landfill
   grading significantly increases
   runoff from site
Dikes and
Interceptor
Ditches
•  Divert and route runoff away
   from slopes
•  May be either temporary or
   permanent structures
   For slopes subject to overland
   flow
   Flow must be diverted to
   controlled drainage path
   Ditches must be lined to prevent
   channel erosion
Slope Drains
   Direct runoff down slope in
   controlled structures,
   temporary or permanent
   Flexible down drains, pipe
   drops, and chutes may be
   used
   For slopes subject to
   concentrated runoff
   Runoff must be directed to inlet
   of slope drain
   Outlet of slope drain often
   requires energy dissipator or
   stabilized surface to prevent
   erosion from  high flow velocity
   discharge
Mulches
   Provide protective cover over
   soil to dissipate the erosive
   force of rainfall and overland
   flow
   Straw, wood chips, sawdust,
   and other materials may be
   used
   For exposed slopes subject to
   rainfall impact and overland flow
   Many mulches require anchoring
   on slopes steeper than 3H:1V
   with netting or similar material
   Should be combined with
   establishing vegetation
   Can be applied with seed,
   fertilizer, and lime in one
   operation by hydroseeding
   technique
                         (continued)
                                                                                17-25

-------
    Table 17-3. Corrective Action Alternatives for Erosion Control Problems (cont)
Technique
Functions/Description
Applications/Restrictions
Benching or
Scarifying
Slopes
   Provides series of small
   terraces to slow overland flow
   and provide flat surfaces for
   seed and mulch to prevent
   their being washed off
   Scarifying of slope can be
   done with  special attachment
   on bulldozer or other grading
   equipment
   Horizontal surfaces on micro-
   terraces are typically 25 cm
   wide.  Benching with terraces
   up to a few meters in width
   may also be used	
   For steep slopes subject to
   overland flow
   Should be combined with
   establishing vegetation cover
   Effective in cohesive soils only
Vegetation
Cover
   Provides protective cover
   over soil; root system helps
   bind soil particles and
   prevents their washoff
   Wide variety of seed mixes
   and methods of application
   are available
   Hydroseeding combines
   seeding, fertilization, and
   mulching in one operation
   For exposed slopes, channels,
   and other areas where soil is
   susceptible to erosion
   Subject to climatic restrictions
   Time of year is important in
   seeding
   Some plant species may be
   sensitive to landfill gas
   accumulating in root zone
   Compatibility should be
   demonstrated prior to seeding
   whole area
                                                                               17-26

-------
     Table 17-4. Corrective Action Alternatives for Control of Leachate Generation
Technique
Functions/Description
Applications/Restrictions
Covers
   Decrease amount of
   precipitation infiltrating into the
   waste and generating leachate
   Low permeable barrier layer is
   placed over waste in conjunction
   with other layers of total cover
   system
   Applicable to closed landfills or
   filled areas of operating landfills
   Cover must include landfill gas
   vent system and erosion control
   protection
   Expensive procedure that
   should be part of an overall
   closure plan
Impermeable
Barriers
   Located upgradient or around
   perimeter of landfill
   Prevent movement of
   uncontaminated groundwater
   into refuse
   Slurry trenches, grout curtains,
   or sheet piling are used to
   construct barrier
   For landfills located in shallow
   groundwater flow systems
   Barriers must be deep enough
   to ensure that groundwater
   cannot pass beneath barrier and
   flow up into refuse
   More effective if they can be
   keyed into underlying low-
   permeable  soil
   Not effective in  groundwater
   discharge area
Interceptor
Trenches
   Located upgradient or around
   perimeter of landfill
   Capture groundwater and divert
   it around landfill; depress water
   table near landfill
   Perforated collection pipes are
   backfilled with gravel
   For landfills located in shallow
   groundwater flow systems
   Trenches must be deep enough
   to effectively lower water table
   Discharge area is required for
   flow collected by pipes
   Not effective in groundwater
   discharge areas, nor in soils of
   low permeability
Groundwater
Pumping
   Located upgradient of landfill
   Lowers local water table below
   refuse level
   Well point or deep extraction
   wells are used
   For landfills located in shallow
   groundwater flow systems
   Can be effective in groundwater
   discharge areas
   Not effective in low permeable
   soils
   Discharge area is required for
   pumped groundwater
   Operating and maintenance
   costs associated with wells and
   pumps are high
                                                                                17-27

-------
     Table 17-5. Corrective Action Alternatives for Control of Leachate Migration
Technique
Functions/Description
Applications/Restrictions
Impermeable
Barriers
   Prevent migration of leachate
   from site
   Slurry trenches, grout curtains,
   sheet piling, and geomembrane
   liners are used
   Located around perimeter of
   landfill
   Effective against only shallow,
   subsurface leachate flow
   Must be combined with some
   type of collection system to
   remove leachate generated
   within landfill
Subsurface
Drains
   Collect leachate migrating from
   landfill beneath the surface or
   through seeps on the surface
   Typically consist of trenches laid
   with perforated pipe, backfilled
   with gravel, and covered
   Located around perimeter of
   landfill or at base of slopes
   experiencing leachate seeps
   Leachate must be transported to
   treatment system
Ditches
   Collect surface seeps of
   leachate
   Located at base of leachate
   seeps
   Leachate must be transferred to
   treatment system
   Treatment costs are increased
   since ditches also capture
   surface runoff which becomes
   contaminated and must be
   treated
   Ditch should be lined
   Useful only for temporary control
Groundwater
Pumping
   Creates cone of depression
   beneath landfill to prevent
   leachate from migrating with
   groundwater flow system
   beyond site boundary
   Deep extraction wells are used
   For landfills experiencing
   subsurface migration of leachate
   in groundwater flow system
   Located beneath landfill or on
   downgradient side of
   groundwater flow system
   Extracted water must be
   transferred to leachate treatment
   system
   Maintenance and long-term
   operating costs are high
                                                                               17-28

-------
it will migrate laterally along the path of least resistance until it can vent to the atmosphere.
Physical barriers such as low-permeability soils and final cover systems can lead to unwanted
migration unless specific measures for venting the gas are provided.
Uncontrolled gas migration may result in the accumulation of gas in structures on or near the
site.  Where gas concentrations indicate a potential explosion hazard, or noxious gas odors
are present, appropriate corrective actions will be required. These may include passive control
measures, such as vents and barriers, or active control measures, such as forced ventilation
and gas treatment systems. Alternatives for correcting gas migration problems are described
in Table 17-6.
17.6.3.5   Collection/Consolidation/Relocation of Waste
In  most open dumps,  the  waste has simply been discharged into a general  area, with no
consideration as to how the fill would be placed, compacted, covered, and graded.  The result
is a highly inefficient disposal  operation that,  even if the usual  environmental impacts are
absent,  could benefit  from certain improvements.  At  any uncontrolled disposal  site, the
appropriate corrective  actions should be  based  on the type of  analysis discussed earlier.
                                              --. e-.   ' '                             ff-
However,  it  is reasonable  to  anticipate  that  many   situations  would  benefit  from
collection/consolidation/relocation of the waste.  Such measures may be used to improve
environmental controls and  to reduce operating  and closure  costs at the same  time.
Alternatives for collection/consolidation/relocation include the following:

•      excavation or collection of waste deposits from around the outside of the site to reduce
       the size of the waste disposal area, immediately followed by placement, compaction,
       and covering of the collected material within the remaining area;

•       excavation of all waste (particularly if the dump site is small) and hauling the material to
       an approved disposal facility;
                                                                                 17-29

-------
    Table 17-6.  Corrective Action Alternatives for Control of Landfill Gas Migration
Technique
Functions/Description
Applications/Restrictions
Pipe Vents
   Provide flow path for landfill gas
   to atmosphere or to header pipe
   for burning or recovery
   Vertical or horizontal perforated
   pipe in borings or trenches
   backfilled with gravel are used
   Located in or around perimeter
   of landfill
   Active system is more effective
   than passive system in
   controlling lateral migration
   Monitoring is required to ensure
   system is effective
Trench Vents
   Provide flow path for landfill gas
   to atmosphere or collection
   system
   Narrow trenches backfilled with
   gravel are used
   Should be combined with
   impermeable barrier on outer
   wall of trench
   Located around perimeter of
   landfill
   Can be free venting or part of
   collection/recovery system
   Can be passive or active,
   although active is more effective
   Depth should be 60 cm below
   water table, low permeability
   layer, or bottom of landfill,
   whichever is shallower
   Monitoring is required to ensure
   effectiveness
Impermeable
Barriers
•  Prevent lateral migration of
   landfill gas
•  Slurry trench, clay, or
   geomembrane liner are used
   Located around perimeter of
   landfill
   Same depth requirements as
   trench vents apply
   Should be combined with vent
   system to be effective
   Monitoring is required
Gas Burning
   Oxidizes volatile, odorous gases
   to non-odorous components
   Flaring of gases at controlled
   combustion points is used
   For landfills generating nuisance
   levels of odorous gases
   Maintenance of flares is required
   Adequate methane must be
   present in gas to support
   combustion
                                                                               17-30

-------
 •      excavation  of  all  material,  temporarily  stockpiling  it  nearby  with  appropriate
       environmental controls, constructing a new landfill on the original site in conformance
       with modem sanitary landfill standards, and disposal of the excavated material in the
       new facility; and
 •      excavation of the material, processing it, reclaiming recyclable materials, upgrading the
       site, and disposing of residues in the new site (landfill mining and reclamation).
 Depending on the  particular circumstances, the  site would  then be operated or closed as
 necessary. Operation would entail bringing the site up to modem landfilling standards with
 respect to filling, compacting, and covering the waste; site drainage; management of leachate
 and gas; environmental monitoring; general administration; etc.

 17.7  Landfill Mining and Reclamation

 17.7.1    Background
 Landfill mining and reclamation (LFMR).is a planned and controlled method of excavating and
 processing disposed solid wastes. LFMR can be used as a measure to upgrade open dumps
 and poorly designed or improperly operated landfills that do not meet applicable or acceptable
 environmental and public health specifications [1].  LFMR technology  can  range  from low-
 capacity,  labor-intensive  systems to high-capacity, mechanical systems.  High-technology
 processing  (e.g.,  50  to  100  Mg/hr  of  excavated  material) typically involves a  series  of
 mechanical, or mechanical  and manual, processing operations.  Typical equipment used in
 simple, high-technology LFMR operations are excavators, screens, and conveyors.   Low-
 technology processing usually involves the use of very few and simple pieces of equipment
 (e.g., screens) and of substantial manual labor.  Regardless of the level of the technology, the
systems have a common element of portability  so that they can easily be moved from a
completed excavation to a new location.
                                                                                17-31

-------
Applications of LFMR that have potential and relevance in economically developing countries
include: 1) the excavation and processing of wastes in an open dump to recover disposal
capacity and to convert the site to a modem landfill; and 2) remediation of land disposal areas
that suffer from adverse environmental impacts, through excavation, processing, and removal
of waste materials.  The potential of LFMR for recovery of materials (e.g., soil) is discussed in
Chapter 15.
Landfill mining was first described in 1953 in an article that documented the processes used at
a landfill operated by the City of Tel Aviv,  Israel  [2].  The primary objective of the  LFMR
operation was to excavate the waste  for the recovery of a soil amendment.  Excavation and
processing equipment  included a front-end  loader, several conveyors, and a rotating (i.e.,
trommel)  screen.   According to  literature,  the operation  in Tel Aviv remained the only
application of LFMR until the 1980s.

Two developments took place between 1950 and 1980 that impacted landfill mining. One was
the emergence of a modular processing system designed to process mixed waste as it arrived
at landfills or at transfer stations, primarily for the purpose of recovering steel containers.  The
second development took place in the late 1960s/eariy 1970s, and concerned an assessment
of the technical feasibility of composting landfilled municipal solid waste in situ.  Although the
landfilled waste composting project was not commercialized, it provided  information on the
acceleration of the degradation of organic  matter in a landfill  as well as  emphasized the
importance of a cellular structure  in a sanitary  landfill.   The modular concept of processing
wastes at disposal facilities, in conjunction with in situ processing of  landfilled  wastes,  has
become the basis of many current and planned LFMR systems.

During the 1980s, two major trends brought about renewed interest in landfill  mining. The first
trend was the shortage of landfill space in some areas and the second was  the emphasis on
resource recovery.  In  1982,  a proposal was made to the Metro Manila  Commission in the
                                                                                17-32

-------
 Philippines [3]. The proposal called for the application of landfill mining in the upgrading of
 one of Metro Manila's disposal sites on the Island of Balut, Tondo.  However, the project was
 not implemented, primarily due to a shortage of funds.  During the early 1990s, the use of
 LFMR as a method of remediating disposal sites to current environmental standards gained
 the interest of municipalities, as well  as  the  use of the technology to  reduce the  area of
 completed landfills in order to reduce the cost of closure and of post-closure activities.

 17.7.2    Status
 Relatively few written evaluations of landfill mining have  been prepared.  However, some
 processing of land-disposed wastes has occurred in the Philippines and in the Republic of
 China.  In the United States, about one dozen landfills have been or are being mined. A brief
 description of two of the projects that have been conducted in the United States is presented
 below.  The descriptions  of the projects  and their results serve to illustrate  the variety of
 reasons for considering and implementing an LFMR operation, and to illustrate design aspects
 and operating experience.
 17.7.2.1  Collier County, Florida
 A comprehensive field test evaluation [1] of  the Collier County landfill  mining system  was
 conducted in 1992 under the U.S. EPA's Municipal Innovation Technology Evaluation (MITE)
 Program.   The LFMR system  is operated as a means to reuse  a previously unlined  land
 disposal area as a modem sanitary landfill. An added benefit of the LFMR operation is the
 recovery of a soil-like material that can be used as cover material, which would normally have
 to be purchased from off-site sources.  The process consists of excavation and processing of
 the excavated wastes using mechanical equipment.  The key piece of processing equipment is
a trommel  screen.  The mined wastes are relatively well decomposed. Consequently, as
shown in Table 17-7, the  soil fraction recovered from the process (i.e., cover material plus
finely sized, decomposed wastes) accounts for about 60% of the excavated material.
                                                                                17-33

-------
           Table 17-7.  Mass Balance and Efficiency in Stream Concentrations
                         - Collier LFMR Demonstration Project
Fraction
Non-processible
Soil
Ferrous
Plastics
Residue and Other*

Mass Fraction
(wt %)
18
60
2
2
J8
100
Stream Purity
(wt%)
N/A"
94
82
75
-

          "   Not applicable.
          b   Includes heavies, finger-screen unders, and aluminum.
 The properties of several of the recovered streams from the Collier County LFMR system were
 determined through laboratory analyses.  In the case of the soil fraction, the concentrations of
 metals were found to be low- Environmental monitoring of the LFMR operation was conducted
 during the technology  assessment.  No  significant occupational or public health and safety
 problems occurred or were identified during the demonstration project.
 17.7.2.2  Barre, Massachusetts
 As part of an expansion of a land disposal site, a private operator excavated and  processed a
 section of the site that  had been filled with  waste in an unlined area between the mid-1950s
 and 1970. The wastes  in the unlined areas were excavated and relocated while the excavated
 area was lined to serve as new disposal capacity.  The soil  fraction recovered from  the
 processing of the excavated wastes was retained for use as cover material for the  new facility.

 17.7.3    Technology
The discussion on technology is preceded by a paragraph on accelerated decomposition,
because stability of buried organic wastes is preferable prior to landfill mining and reclamation.
                                                                                17-34

-------
 17.7.3.1  Accelerated Decomposition
 Excavating and processing insufficiently decomposed wastes poses the risk of unacceptable
 generation of nuisances and adverse consequences with regard to human health and safety
 and to the environment.  If landfill mining and reclamation is attempted before the landfilled
 wastes are sufficiently stabilized, precautions must be taken to protect the health and safety of
 the workforce and to protect the environment.  Leachate recirculation is one of the means
 employed to accelerate the process of decomposition.
 17.7.3.2  Process Design
 Process design focuses on the attainment of the  following  four goals:  1) excavation  of the
 landfilled material; 2) processing of the excavated  material to remove  recyclable  or reusable
 materials, such as ferrous metals,  stabilized organic matter, and soil; 3) transport of the
 process residues to a landfill; afhd 4) remediation of the excavated area. Depending on the
 plan, the excavated area could be properly lined and serve as a landfill.

 One aspect of processing design is the recovery of material  resources.  In the case of those
 economically developing countries where relatively large percentages of the  wastes are
 putrescible, cellulosic, or both, the materials worthy of recovery include  biologically  stable
 organic fines  for  use as  landfill  intermediate cover material,  final  cover  material, soil
 amendment, or a combination of these. Other material fractions for consideration for recovery
 could be ash and  other inorganic fines in those instances where these types of materials are
 present at relatively high concentrations in a  disposal site.  Potential uses of these materials
 include road and  building construction materials.  For example, at one disposal site in the
 Republic of China, brick material, ash, and other fines are recovered from landfilled wastes for
the manufacture of new bricks.
17.7.3.3  Excavation
The technology involved in the excavation of landfilled waste  has not changed much since the
Tel Aviv experience in the 1950s.  Generally, excavation is  conducted using techniques similar
                                                                                  17-35

-------
 to those used for open face mining.   Equipment  involved may be a  front-end loader, a
 clamshell, a backhoe, a hydraulic excavator, or a combination of these.  Excavated material
 either may be directly processed on-site or be stockpiled for later processing, either on-site or
 at a processing facility.
 Processing begins with the segregation of the excavated mass into discrete streams.  As
 indicated earlier, processing can be mechanical, manual, or both.
 Processing at a large  landfill site  is  best accomplished by means of equipment that is
 characteristically portable. The equipment usually consists of conveyor belts and a screen.

 The number of separated streams and the degree of processing involved depend upon several
 factors. Not the least of the factors is whether the processed material is to serve as a resource
 or is to be rendered innocuous (remediation or upgrading of a disposal site).

 The quantities and characteristics of the material fractions (streams) that are generated by a
 LFMR operation  depend  upon:  1)the physical  and chemical properties  of the excavated
 material, 2) the effectiveness of the type of mining technology, and 3) the efficiency with which
 the technology is applied.  Judging from available information, and assuming a practical range
 of stabilities of the mined material and of mechanical processing efficiencies, recovery of soil-
 like material could be expected to be in the neighborhood of 30 to 70% of the excavated mass.
 The ratio of soil to other materials depends upon the type of waste landfilled, landfill operating
 procedures, and the extent of degradation of the disposed wastes.

 17.7.4    Feasibility of LFMR
Site-specific conditions determine whether or not LFMR can be used as a method of corrective
action. Key conditions include:

•      composition of the waste initially put in the landfill;
                                                                                  17-36

-------
•      landfill geometry;

•      historic operating conditions, if any;

•      extent of degradation of the waste; and

•      quantities  of processed materials that, because  of their  characteristics (e.g., toxic
       wastes), require extraordinary means to transport and dispose of them.

In the case of economically developing countries, LFMR has potential utility in the remediation
of open dumps and in the conversion of an open dump to a landfill.  It can also be employed to
recover landfilled resources such as a soil fraction for use on-site as cover material.

Based on the few analyses reported thus far for LFMR projects in the United States, the heavy
metal content and other characteristics of the recovered soil fraction indicate that the fraction is
suitable for use as landfill cover. However,  it should be emphasized that the characteristics of
the recovered materials are substantially a  function of the composition of the buried waste -
including  concentrations of  heavy metals  and of other  potentially toxic compounds.   The
percentage of recovered materials and their characteristics and properties are functions of the
composition of the landfilled material and  the configuration and operating conditions of the
landfill mining process.  Analyses of the characteristics of landfilled wastes are required to
properly assess the feasibility of LFMR and  to property design and operate an LFMR system.
      __.                                                   i
References
1.     von Stein, E.L and G.M.  Savage,  Evaluation of the  Collier County,  Florida Landfill
       Mining Demonstration, EPA/600/R-93/163 (NTIS PB94-114824), U.S. EPA, Cincinnati,
       Ohio, September 1993.
2.     Shuval, H., "Composting Municipal Garbage in Israel," Tavruau, July/December 1958.
3.     CalRecovery, Inc., Metro Manila Solid Waste Management Study, Final Report, 1982.
                                                                                17-37

-------
 Chapter 18
 Economic Considerations

 18.1  Introduction
 The coverage in this chapter of the economics of waste disposal is limited to the costs directly
 related to construction and operation.  Omitted from the discussion are other costs that are
 sometimes  charged to the  landfill  account,   the other costs include those for  operating
 recycling programs and non-regulated hazardous waste management programs, and fees for
 external solid waste programs (i.e., state, province, or national governmental).
 The cost of land disposal of  solid  wastes is obviously  a function of the complexity of the
 construction and of the operation of the facility.  For a given location, the cost increases as the
 complexity of the design increases in response to governmental and public desire for greater
 protection of the public health and of the environment.  An example of the influence of
 increased complexity of landfill disposal facilities in the United States is shown by the data in
 Table 18-1.
 The data in Table 18-1  illustrate the average trend among the major cost elements of landfill
 disposal costs in the United States from the  1970s to the 1990s.  In the 1970s,  the major
 fraction of the costs for landfilling was that associated with site operation.  Since  a  large
 number of economically developing  countries do not have regulations which require liner and
 capping  systems and closure  and post-closure care, their current cost histories and trends
 correspond approximately to those in the United States in the 1970s.  As the environmental
 performance requirements for land disposal sites became more stringent (around the middle of
the 1980s) and the public awareness of the environmental impacts of inadequately designed
disposal  facilities increased in  the United States, the cost of constructing landfills increased;
conversely, the operational costs as a percentage decreased.  In addition,  long-term post-
                                                                                  18-1

-------
         Table 18-1. Changes in Landfill Development Costs in the United States"
1-
ttem
Pre-development
Construction
Operation
Closure
Post-closure Care
Unanticipated
Total

1975"
5.9
12.3
75.7
6.1
0
0
100
Typical Cost (%)
1986°
5 to 10
25 to 35
40 to 50
1to5
10 to 15
0
100

1990"
7.0
35.0
36.0
3.0
11.0
8.0
100
 Adapted from Reference 1.
 *   Profit is not included, 16-ha site, 1 million Mg, 15-year site life.
 b   Includes 117 cm soil liner and leachate collection system.
 0   Includes 150 cm clay liner (available on-site) and 30-year post-closure.
 d   Includes 150 cm day liner (available on-site), 30 mil synthetic liner, leachate collection
     system, increased monitoring.
 closure care of the disposal facility was also required and, therefore, the cost of the care had
 to be added to the overall cost.  More recently, in the United States (in the early to mid-1990s),
 the average cost of construction and operation of landfills has  reached  a plateau.  Not
 illustrated in the table for the time period shown is the wide variation in the magnitude of landfill
 disposal costs  from region to region, primarily due to differences  in mandated performance
 requirements and the availability of land.

 The cost of landfilling depends  on many factors.  Among the more important factors are: the
 characteristics and quantities of waste to be disposed, in-place density of waste and ratio of
 cover material to solid waste, availability of suitable soil for use as cover and liner materials,
 ruggedness of the terrain and ease of access to the site, and whether or not the construction
will be phased.  All other factors being equal, phased landfill construction generally is cheaper
                                                                                   18-2

-------
than  construction  of  the  entire landfill  site at one time.  Site  conditions and  regulatory
requirements for landfill construction  are major determinants of the magnitude  of landfill
construction costs and  differences among them can result in large differences in costs of
construction.

One method of estimating landfill costs is to examine past and current landfill operations in the
general vicinity of the  proposed disposal area and to obtain or estimate the costs.   An
estimation of both capital cost and operating cost is required.  Additionally, the estimate must
be adjusted to reflect the differences between the reviewed disposal  operations and  the
proposed operation.

The cost of landfill disposal contributes to the total cost of waste management of a community.
When landfill costs become a relatively high percentage of the cost of waste management,
they also  can have a substantial influence on the extent and nature of the processing to which
the wastes might be subjected prior to ultimate disposal. For example, salvaging and recycling
of materials may compete for discarded materials and divert them prior to land disposal.

The cost of operating a  landfill can be recovered by means of a user fee, i.e., the user bears
the cost of the service.  The fee typically is  known as  a "tipping fee."  Tipping fees  are
commonly, but not exclusively,  used to recover the cost of operating landfill in industrialized
countries.  Tipping fees  generally are charged according to the weight or volume of the waste
and to the type of waste.

18.2   Potential Methods of Cost Reduction
In those instances and locations in which land suitable for landfill disposal is available at low
cost and development costs  are low, the cost of landfilling is a relatively small fraction of the
total disposal cost.  Under such  circumstances, landfilling solid wastes without processing
usually would be the least expensive method of management. On the other hand, some form
                                                                                 18-3

-------
 of waste processing to reduce amounts and volumes of wastes destined to be landfilled may
 be economically justifiable in a location in which suitable landfill sites are expensive to develop.

 One  method  of  determining the financial  performance of a  landfill  disposal system and
 operation is to analyze the unit cost (i.e., cost per Mg disposed) over the economic life of the
 fill. By virtue of this method of analysis, potential optimization or reductions in unit cost can be
 identified and secured by considering two alternatives: 1) implementing  measures that reduce
 the overall cost without sacrificing the quality and  performance of service, and 2) increasing
 the quantity of wastes that are landfilled.   In those cases in which  the costs have been
 optimized, only the second alternative represents potential for decreasing the unit cost.  This
 alternative is sometimes overlooked as a potential means of improving system performance.  A
 disadvantage of using this strategy, of course, is a reduction in the lifespan of the fill.
 Reductions in the unit cost of landfilling, or its optimization,  can be realized by operating the
 landfill such that the  density of solid wastes placed  in the fill is the highest technically
 achievable  value.  As discussed in Chapter 10,  in-place  density  is  a  function of several
 operating variables (e.g., number of passes of compacting machinery).  In the case of existing
 disposal operations, reductions in the unit cost of  disposal (assuming that the accounting of
 cost  is performed over the economic  life  of the  improvement) can be  improved  if the
 operational procedures are conducted so that the density of the in-place waste is maximized.

 Shredding and baling  are two of the more common methods of processing wastes to achieve
 high  in-place  densities in a landfill.  Either method,  if applicable and under  appropriate
 conditions, can increase the density of  the  collected waste, thereby reducing the volume
 occupied by the buried waste.  Thus, these two methods of processing can increase the mass
 of waste that can be placed in the fill. Additionally,  less cover soil normally is required.  Ex-
panding the mass capacity of the  landfill and reducing the cover requirements can lower
landfill disposal costs if the savings exceed the cost of processing.
                                                                                  18-4

-------
 Removal of recyclable materials (e.g., scavenging, composting) is a form of waste processing
 that is comparable to shredding and baling in terms of reduction of amount of waste destined
 to be landfilled. The scavenging may take place before, during, or after collection.
 In addition  to methods of reducing  the quantities and volumes of wastes entering a land
 disposal site, the cost of land disposal can be contained in some cases by upgrading the
 quality of the waste to a level that does not require extraordinary landfilling or containment
 measures for the protection of the public  health and of the environment.  Examples of
 extraordinary measures  are those prescribed  for a "hazardous waste" landfill  (Chapter  8).
 Among  the  approaches to upgrading are  detoxification  of toxic wastes,  encapsulation or
 solidification of hazardous or toxic substances, and  acceptance of semi-solid wastes only in
 those cases where the moisture content is less than the acceptable moisture content (e.g.,
 60%).

 The large-scale processing of waste for recovery of valuable materials prior to land disposal
 may be justifiable according to technical and/or financial criteria in areas where landfill capacity
 is scarce and alternate sites are remote from the area of waste generation (i.e., more than 50
 km away).  Depending on the circumstances and conditions, the large-scale processing could
 be feasible near the point of collection (i.e., in conjunction with a transfer station) or on the site
 of the landfill itself.  In either case, the outcome of materials recovery is a reduction in the
 types and quantities requiring land disposal and, therefore, in disposal costs.

 18.3   Capital and  Operating Costs
Among the principal  capital costs are those  of land, structures, site preparation and access,
vehicles, and heavy equipment.  These capital  costs usually  are fixed  costs in that, as a
general rule, they do  not vary (thus, the use of the term "fixed") during the course of the landfill
operation.  Labor required for maintenance,  fuel costs, and cost of cover material emplaced
                                                                                  18-5

-------
during the operation of the landfill are all generally classified as operational costs. Operational
costs  are variable in  that they generally  increase with the  quantities  of wastes that are
disposed.
A major difficulty in developing a method of estimating the  cost of landfill disposal in an
economically developing country is the scarcity of reliable data.  Thus, data  collection is an
important first step in accurate cost estimating. The task of data collection can be facilitated
considerably by following an organized method. In brief, the method consists of tabulating the
applicable components, or elements,  of cost (e.g., cost elements such as site preparation),
estimating the  magnitude of the cost of each cost element, and  performing some arithmetic
calculations to total and analyze the  costs.  One representation of the cost components of
landfilling is illustrated in Table  18-2.  Also shown for illustrative purposes in the table is  a
relative distribution of the costs among the components.
          Table 18-2.  Individual Component Cost Relative to Total Landfill Cost*
Component
Pre-development
Construction Costs
Operation Costs
Closure
Long-term Care
Other
% of Total Cost
3.6
35.5
46.0
0.9
11.5
2.5
'  Adapted from References 1,2, and 3.

A guide, or alternatively model, for cost accounting is presented in Table 18-3.  The guide is
presented in the form of a worksheet for calculating the cost of landfill disposal.
                                                                                    18-6

-------
                    Table 18-3. Worksheet for Estimating Landfill Costs
              (40 ha net disposal area, 180 Mg/day facility) (1995 US Dollars)
Pre-Development Costs
Siting the facility (engineering, legal fees, and preliminary geotechnical investigations)          $106,000
Site mapping (topographic/boundary surveys) and final geotechnical investigation                106,000
Engineering design and regulatory permit application                                         141,000
Legal and public hearings                                                                70,000
Land purchase                                                                          352,000
Regulatory permitting fees                                                                 7,000
Administrative support services                                                           35,000
Contingency                                                                           70.000
[a]     Total Pre-Development Cost                                                   $887,000
Initial Construction Costs
Entrance and access roads                                                             $141,000
General site excavation and land clearing                                                1,055,000
Erosion and sediment control facilities                                                     70,000
Liners and liner cushion system                                                           774,000
Leachate collection and landfill gas venting system                                          70,000
Leachate treatment system        -                                                       141,000
Site landscaping                                                                        70,000
Scale system                                                                          70,000
Scatehouse and office building                                                           28,000
Equipment maintenance facility                                                           106,000
Public convenience area                                                                 42,000
Miscellaneous site paving                                                                42,000
Miscellaneous (lighting, gates, signs, etc.)                                                  70,000
Construction engineering and quality control testing                                          70.000
Subtotal                                                                             2,749,000
Contingency                                                                           63.000
[b]     Total Initial Construction Cost                                                $2,812,000
Annual Operational Costs
Site personnel and management                                                        $281,000
Facility overhead (e.g., building and ground, site maintenance, and electricity)                   70,000
Equipment operations and maintenance                                                    70,000
Equipment rental                                                                        211,000
Road maintenance                                                                      35,000
Routine environmental monitoring (e.g., groundwater, surface water, and landfill gas)            35,000
Engineering services                                                                    42,000
Site and equipment insurance/closure bonding                                              70,000
Ongoing development and construction costs                                               352,000
Leachate treatment at a municipal sewer system                                             14,000
Pre-treatment of leachate prior to disposal into municipal system                              70,000
Unanticipated costs                                                                      70.000
M     Total Operational Costs       	$1.320.000
                                                                                  (continued)
                                                                                         18-7

-------
                    Table 18-3. Worksheet for Estimating Landfill Costs
           (40 ha net disposal area, 180 Mg/day facility) (1995 US Dollars) (cont.)
 Closure and Post-Closure Costs
 This assumes that the final cap on the landfill is part of the cost while the landfill is operating. The annual
 amount should be set aside during the operational years of the landfill.
 Costs include the following:
 •   Engineering fees for preparation of a closure plan
 •   Regulatory approvals of the closure plan
 •   Final site grading and revegetation
 •   Maintenance of erosion and sediment control facilities
 •   Operation and maintenance of leachate collection and treatment system
 [d]     Annual Closure/Post-Closure Costs
 Annual Cost
   $70,000
 [e]     Capital costs (a + b)
 [f]      Amortization of capital costs - straight line depreciation over 20 years at 9%
 [g]     Annual operating cost
 [h]     Annualized closure and post-closure costs (d)
 [I]      Total annual cost (f + g + h)
 fj]      Annual tons per year (200 tons/day x 6 days/week x 52 weeks/yr)
 [k]     Cost per ton (i/j)
 [I]      Host community fee for capital improvements
 [m]     State or local fee
 In]     Total Tipping Fee (k +1> m)
 Cost per Household per Month
 [o]     Annual cost (I)
 [p]     Population (people)
 [q]     Cost per person (o/p)
 [r]      Persons per household
 [s]      Cost per household (q x i

Adapted from Reference 4.
$3,699,000
   401,000
 1,323,000
    70,000
 1.794,000
 56,160 Mg
    32/Mg
   $32/Mg


$1,794,000
   100,000
     $18/yr
         4
  $6/month
                                                                                         18-8

-------
Although the model and worksheet are based on conditions in the United States, they can be
adapted easily  for use in economically developing countries.   The adaptation is  possible
because the model is based on generic rather than specific cost elements and principles. The
costs, as listed in the table, can be interpreted as being "indicators" of the relative costs among
the capital and operating cost elements. When adapted for use for another country and set of
circumstances, the costs of the cost elements similarly will be indicators of cost allocation for
that application.
The cost accounting worksheet presented in Table 18-3 encompasses the main elements of a
modem landfill  project  -  namely,  pre-development, initial construction  (i.e., capital improve-
ments), annual operation,  and closure and post-closure.
The costs  listed in the worksheet are an example of those for a 180 Mg/day landfill operation
designed to serve a population of 80,000 to 100,000 people, operating in the United States.
The facility is situated on  a site which has a fill area of about 40 ha, and 60 ha dedicated to
disturbed (roads, etc.) and non-disturbed buffer areas. The average excavation depth is about
9 m.  The costs also include a double-liner system and a  leachate collection  and detection
system. The facility operates 6 days per week, 52 weeks per year.
Having established the  cost elements that apply to a particular landfill site and  operation, the
estimation  process  is  reduced  to properly estimating  their costs.   The  effort  placed  on
determining the magnitude of  the costs  depends  on the objective of the analysis.  The
objective can range from estimates of costs for general planning and evaluation of alternatives
to final cost estimates for: facility  design and operation, financing, and specification of cost
recovery schedules.  Obviously, the greatest effort to determine and establish accurate costs is
in those cases where  inaccurate cost estimates  cause  the greatest risks  and  financial
exposures, e.g., the case of estimating costs for purposes of securing financing for capital
equipment, and setting rates for recovery of cost.
                                                                                   18-9

-------
 Cost estimation using general models, formats, and non-site specific data is appropriate for
 general planning and estimating the range of the potential magnitudes of construction and of
 all the other costs associated with landfill design and operation.  This method of cost analysis
 is useful in making initial or conceptual design decisions and for comparing various disposal
 options.
 Approximate magnitudes of costs for the development and operation of modem sanitary
 landfills can be gained by observing those for facilities in the United States over a range of
 landfill sizes. The magnitudes of costs are provided in Table 18-4 for landfill sites having 100,
 200, 300, and 400 ha in total area.

 18.4  Costs Associated with Landfill Equipment
 In the case of most large landfills, the capital costs of heavy equipment used for landfilling
 solid waste  constitute a major cost component for the development and operation.  As was
 mentioned in Chapter 9,  "Equipment Selection," the two  principal uses for landfill  equipment
 are  to move and  compact wastes and to move and compact soil.   An indication of the
 magnitude of the cost of equipment can be  gained from the data presented in Table 18-5.
 Because of the high costs associated with the heavy equipment required for  landfilling,  the
 acquisition of a sufficient number of the appropriate equipment for the efficient and  continuous
 operation of a fill oftentimes is not carried out in economically developing countries.

 Under the conditions of operation in the United States, the economic lifespan of mobile landfill
 equipment generally is estimated to be about 5 years (i.e., about 10,000 hours of operation)
 [5J.

 In an industrialized nation, the annual cost of maintaining  heavy landfill equipment (lubrication,
tire repair, replacement parts, etc.) is estimated as being 16 to 18% of the original  capital cost
of the equipment; the economic  life of the equipment is typically 5 to 7 years. The ratio of
                                                                                 18-10

-------
             Table 18-4. Summary of Landfill Development and Annual Costs
                          in the United States (1995 US Dollars)
Active Landfill Area
Cost Element
Pre-development ($) *
Site Preparation ($)
Clay (on-site)
Clay (16 km-haul)
Membrane/Clay (on-site)
Membrane/Clay (16-km haul)
Operations ($/yr)
Closure ($) b
Post-closure ($/yr)c
100 ha
430,000

8,700,000
10,600,000
11,900,000
12,900,000
220,000
1 ,400,000 to
2,300,000
170,000 to
340,000
200 ha
520,000

18,300,000
21,800,000 ..
24,400,000
26,400,000
380,000
2.800,000 to
4,600,000
240,000 to
480,000
300 ha
610,000

29,500,000
34.600.000
38,500,000
41,700,000
530,000
4,200,000 to
7,000,000
350,000 to
700,000
400 ha
700,000

42,200,000
49,300,000
54,400,000
58,600,000
580,000
5,700,000 to
9,300,000
460.000 to
920,000
*  Items included in Pre-development Costs: environmental impact analysis/report, feasibility report,
   design and plan of operation, administration. Land costs are omitted.
b  Items included in Closure Costs: earth work, seeding, gas collection.
c  Items included in Post-closure Costs: monitoring (groundwater, gas. leachate), leachate treatment,
   site maintenance, liability insurance, seeding, gas collection.
maintenance to capital cost increases substantially if the equipment is operated beyond its
economic life.  The cost of maintenance of equipment in economically developing countries is
obviously dependent upon the prices charged locally for parts and supplies.  The actual cost in
an economically developing country would depend very strongly upon the age of equipment,
type of equipment, maintenance procedures, as well as on a variety of other factors that are
particular to the country.   However, as an approximate estimation,  the  ratio  of annual
maintenance cost to capital cost probably would be on the order of  15 to 20%  until the
equipment's economic life is exceeded.
                                                                                  18-11

-------
                     Table 18-5. Capital Costs of Landfill Equipment
Type of
Equipment
Crawler Dozer



Crawler Loader
Rubber-tired Loader
Landfill Compactor


Flywheel
Power (kW)
<60
67 to 97
104 to 130
186 to 209
<68
75 to 97
75 to 97
119 to 142
119 to 142
<75
<75
89 to 119
89 to 257
141 to 161
224 to 235
250 to 392
Approx. Wta
(Mg)
8 to 10
12 to 16
14 to 20
26 to 34
9 to 11
12 to 16
12 to 16
16 to 22
20 to 24
7 to 10
8 to 11
9 to 12
10 to 13
<21
29 to 32
31 to 46
Range of Cost"
(US$)
56,000 to 126,000
80,000 to 186,000
145,000 to 194,000
352,000 to 441 ,000
68,000 to 92,000
108,000 to 182,000
108,000 to 182,000
238,000 to 377,000
238,000 to 377,000
98,000
115.000
138,000 to 21 2.000
138,000 to 21 2,000
21 5,000 to 279,000
300,000 to 451 ,000
365,000 to 569,000
Comments
Standard/landfill blade
Standard/landfill blade
Standard blade
Landfill blade
GPB:e 0.8 m3
GPB: 1.5m3
MPB:d1.3m3
GPB: 2.3m3
MPB: 1.9m3
GPB: 1.3m3
MPB: 1.1 m3
GPB: 3.0m3
MPB: 1.7m3
Landfill blade
Landfill blade
Landfill blade
 Source: equipment manufacturers.

 "  Basic machine plus engine sidescreens; radiator guards; reversible fan; roll bar; and either a landfill
   blade, general-purpose bucket, or multiple-purpose bucket as noted.
 "  January 1996.  The range of costs reflects differences regarding the equipment supplied by the
   manufacturer and regarding specifications of options supplied.  Equipment costs in economically
   developing countries may be between 5 to 60% more than the costs of the same equipment in the
   United States.  The additional costs of equipment in economically developing countries can be due to
   any or a combination of the following: transportation costs, taxes, custom clearance, and import
   duties.
 0  General-purpose bucket.
 d  Multiple-purpose bucket.
As is the case with the cost of maintenance, the cost of fuel varies with type, condition, and

use of the equipment.  The cost is fundamentally related to the rate of fuel consumption. As

an approximation, total fuel consumption for a mechanically intensive landfill operation aver-

ages  about 35 liters fuel/Mg waste disposed [6].  Considering  this estimate as the basis, the

fuel consumption per piece of heavy equipment probably would be on the order of 100 liters

per day.
                                                                                     18-12

-------
References
1.      Glebs, R.T., "Landfill Costs Continue to Rise," Waste Age, 19(3), March 1988.
2.      Walsh, J., "More on Sanitary Landfill Costs," Waste Age, 21(4), April 1990.
3.      Glebs, R.T. and T. Juszczyk, "Closure and Post Closure Costs," 21(3), March 1990.
4.      Joyce, L.E., "How to Calculate Waste Disposal Costs," World Wastes, March 1989.
5.      Diaz, L.F., G.M. Savage, and C.G. Golueke, Resource Recovery from Municipal Solid
       Wastes, CRC Press, Boca Raton, Florida, 1982.
6.      Wilson,  D.C.,  Waste Management Planning,  Evaluation,  Technologies,  Clarendon
       Press, Oxford, England, 1981.
                                                                               18-13

-------
Appendix A

Bibliography

1.     Algermissen, ST., et al., "Probabilistic Earthquake Acceleration and Velocity Maps for
       the United States and Puerto Rico," USGS Miscellaneous Field Study Map MF-2120,
       1991.
2.     Algermissen, ST., et al., "Probabilistic Estimates of Maximum Acceleration and Velocity
       in Rock in the Contiguous United States," Open File Report 82-1033, U.S. Geological
       Survey, Washington, DC, 1976.
3.     Barcelona, M.J., et al., Handbook: Groundwater Vol I, EPA/625/6-90/016a (NTIS PB93-
       129732), Office of Research and Development, Cincinnati, Ohio, 1990.
4.     Barcelona,  M.J., et al., Handbook: Groundwater Vol II, EPA/625/6-90/016b (NTIS
       PB93-129740), Office of Research and Development, Cincinnati, Ohio, 1991.
5.     Carroll, Jr., R.G.,  "Hydraulic Properties of Geotextiles," Geotextile  Testing and the
       Design  Engineers, ASTM  952,  American Society  for Testing  and  Materials,
       Philadelphia, Pennsylvania, pp 7-20,1987.
6.     COE,  "Laboratory Soils Testing," EM1110-2-1906, Headquarters, Department of the
       Army,  Office of the Chief of Engineers, Washington, DC, 1970.
7.     COE,  HEC-1, HEC-2,  HEC-5, HEC-6 Computer Programs,  Hydrologic Engineering
       Center (HEC), U.S. Army Corps of Engineers, Hydrologic Engineering Center, Davis,
       California,  1982.
8.     FHWA, "FHWA  Geotextile Engineering Manual," Contract No.l DTF  H61-83-C-00150,
       1985.
9.     FHWA, "Geotextile Design & Construction Guidelines," Contract No. FHWA DTFH61-
       86-C-00102,1990.
10.    Flower, et al., "Vegetation Kills in Landfill Environs," Cook College, Rutgers University,
       New Brunswick,  New Jersey, 1982.
11.    Freeze,  R.A. and J.A.  Cherry, Ground Water, Prentice-Hall, Englewood Cliffs, New
       Jersey, 604 pp, 1979.
12.    Geoslope  Programming,   Ltd.,  PC-SLOPE,  Version  2.0 (May),  Calgary,  Alberta,
       Canada, 1986.
13.    Huang, U.H., Stability Analysis of Earth Slopes, Van Nostrand Reinhold Co., New York,
       New York, 1983.
14.    Hudson, J.F. and P.L. Deese, Optional Cost Models for Landfill Disposal of Municipal
       Wastes, EPA-600/2-85-023 (NTIS PB85-176808), March 1985.
                                                                                A-1

-------
 15.    Inyang, H.I.,  "Aspects of Landfill Design for Stability in Seismic Zones," prepared for
       U.S. Environmental Protection Agency, 1992.
 16.    Koemer, R.M. and G.R. Koemer, Landfill Leachate Clogging of Geotextiles (and Soil)
       Filters, EPA/600/2-91/025 (NTIS PB91-213660), Cincinnati, Ohio, July 1991.
 17.    Koemer, R.M., Designing with Geosynthetics, Prentice-Hall Publishing Co., Englewood
       Cliffs, New Jersey, 1986.
 18.    Landeeth,  B., Lining of Waste Impoundment and Disposal Facilities, SW-870 (NTIS
       PB86-192796), Washington, DC, 1983.
 19.    Landreth,  R.E.,  D.A. Carson,  and  R.M.  Koemer,  Technical Guidance  Document:
       Inspection Techniques  for the Fabrication of Geomembrane Field  Seams,  EPA-
       530/SW-91-051 (NTIS PB92-109057), Cincinnati, Ohio, May 1991.
 20.    Lutton, R.J.,  Design, Construction and Maintenance of Cover Systems for Hazardous
       Waste: An Engineering Guidance Document, EPA-600/2-87/039 (NTIS PB87-191656),
       U.S. Army Corps of Engineers Waterways Experiment Station, Vicksburg, Mississippi,
       1987.
 21.    Miller, J.C. and J.N.  Miller, Statistics for Analytical Chemistry, John Wiley and Sons,
       New York, New York, 1986.
 22.    Monroe, C.C., T.A. Dean, and W.R. Bernard, The Use of Alternative Materials for Daily
       Cover at Municipal Solid Waste Landfills,  EPA-600/R-93-173 (NTIS PB94-104850),
       Risk Reduction Engineering Laboratory, Cincinnati, Ohio, September 1993.
 23.    Moore, C.A., Landfill  and  Surface Impoundment Performance Evaluation,  EPA-
       530/SW-869C (NTIS PB81-166357), 1980.
 24.    Morelli, J., "Municipal Solid Waste Landfills: Optimization Integration, and Reclamation,"
       New York State Energy Research and Development Authority, Albany, New York.
 25.    Naber, T., "Mining the Landfill: The Ultimate Resource Recovery," Waste Age, 196-197,
       November 1987.
 26.    Puls,  R.W.  and M.J. Barcelona, "Filtration of Ground  Water Samples for  Metals
       Analysis," Hazardous Waste and Hazardous Materials, v. 6, No. 4,1989.
 27.    Richardson, G.N.,  E. Kavazanjian, and N. Matasori, RCRA  Subtitle D (258) Seismic
       Design Guidance for Municipal Solid Waste Landfill Facilities, EPA/600/R-95/051 (NTIS
       PB95-217923), April 1995.
28.    Salhotra, A.M.,  P. Mineart, S.  Sharp-Hansen, and  T. Allison, MULTIMED: The
       Multimedia Exposure Assessment Model for Evaluating the Land Disposal of Wastes-
       Model Theory, EPA-600/R-93-081 (NTIS PB93-186252), Athens, Georgia, May 1993.
29.    Schroeder, A.C., A.C. Gibson, and M.D. Smolen, The Hydrologic Evaluation of Landfill
       Performance  (HELP) Model, Volumes I and II, EPA/530/SW-84-009 (NTIS  PB85-
                                                                                A-2

-------
       100840) and EPA/530/SW-84-010 (NTIS PB85-100832), U.S. EPA, Cincinnati, Ohio,
       1984.
 30.    Sharp-Hansen, S., C. Travers, P. Hummel, and T. Allison, MULTIMED: A Subtitle D
       Landfill Application Manual for the Multimedia  Exposure Assessment Model, EPA-
       600/R-93-082 (NTIS PB93-185536), Athens, Georgia, 1993.
 31.    Solid Waste Association of North America (SWANA), "A Compilation  of Landfill Gas
       Field Practices and Procedures," Landfill Gas Division of SWANA, March 1992.
 32.    State of  Florida  Governor's  Energy  Office  and  the  Board of  Collier  County
       Commissioners  Solid Waste Management Department,  Feasibility  Study:  Landfill
       Mining at Collier County, Florida, Naples, Florida,  September 1987.
 33.    Stessel, R.L and R.J. Murphy, Processing Material Mined from Landfills, Interim Report
       Vol. II, University of South Florida, Tampa, Florida, September 1991.
 34.    Travers, C.L. and S. Sharp-Hansen, Leachate Generation and Migration at Subtitle D
       Facilities: A Summary and Review of Processes and Mathematical Models, EPA-600/R-
       93-125 (NTIS PB93-217784), Athens, Georgia, 1993.
 35.    U.S.  Environmental Protection Agency, Case Studies on Ground-Water and Surface
       Water Contamination from Municipal Solid Waste Landfills - Criteria for Municipal Solid
       Waste  Landfills (40. CFR Part 258)  - Subtitle D of the Resource Recovery and
       Conservation Act, July 1988 (draft), Office of Solid Waste and Emergency Response,
       Washington, DC, EPA/530-SW-88-040 (NTIS PB88-242466), 1988.
 36.    U.S.  Environmental Protection Agency, Characterization of Municipal Solid Waste in
       The United States: 1996 Update, EPA/530/R-97/015, May 1997.
 37.    U.S.  Environmental  Protection  Agency, Closure/Post-Closure  Care and Financial
       Responsibility Requirements (Subpart C) - Criteria for Municipal Solid Waste Landfills
       (40 CFR Part 258) - Subtitle D of the Resource Recovery and Conservation Act, July
       1988, Office of Solid Waste and Emergency Response, Washington, DC,  EPA/530-
       SW-88-041 (NTIS PB88-242474), 1988.
 38.    U.S. Environmental Protection Agency, Criteria For Solid Waste Disposal Facilities, A
       Guide to  Owners/Operators, Office  of Solid  Waste  and Emergency  Response,
       Washington, DC, EPA530/SW-91-089,1991.
39.    U.S. Environmental Protection Agency,  Design  and Construction of RCRA/CERCLA
       Final Covers, EPA/625/4-91/025, Office of Research and Development, Washington,
       DC, 1991.
40.    U.S.  Environmental Protection Agency, Design Criteria (Subpart  D) - Criteria  for
       Municipal Solid  Waste Landfills (40 CFR Part  258) - Subtitle D of the Resource
       Recovery and Conservation Act, July 1988, Office  of Solid Waste and Emergency
       Response, Washington, DC, EPA/530-SW-88-042 (NTIS PB88-242482), 1988.
                                                                               A-3

-------
 41.    U.S. Environmental Protection Agency, Guide to Technical Resources for the Design of
       Land Disposal Facilities, EPA/625/6-88/018, Risk  Reduction Engineering Laboratory
       and Center for  Environmental  Research  Information,  Office of  Research  and
       Development, Cincinnati, Ohio, 1988.
 42.    U.S.  Environmental  Protection Agency,  Lining of Waste Containment  and Other
       Impoundment Facilities, EPA/600/2-88/052 (NTIS  PB89-129670),  Cincinnati, Ohio,
       September 1988.
 43.    U.S. Environmental Protection Agency, Location Restrictions (Subpart B) - Criteria for
       Municipal Solid Waste Landfills (40 CFR Part 258)  - Subtitle D of the Resource
       Recovery and Conservation  Act,  July 1988, Office of Solid Waste and Emergency
       Response, Washington, DC, EPA/530-SW-88-036 (NTIS PB88-242425), 1988.
 44.    U.S. Environmental Protection Agency,  Manual of Water Well Construction Practices,
       Office of Water Supply, EPA-570/9-75-001 (NTIS PB 267-371), 1977.
 45.    U.S. Environmental  Protection Agency, Operating  Criteria (Subpart C) - Criteria for
       Municipal Solid Waste Landfills (40 CFR Part 258)  - Subtitle D of the Resource
       Recovery and Conservation  Act,  July 1988, Office of Solid Waste and Emergency
       Response, Washington, DC, EPA/530-SW-88-037 (NTIS PB88-242433), 1988.
 46.    U.S.  Environmental  Protection Agency, Remedial Action at Waste Disposal  Sites
       (Revised), EPA/625/6-85-006 (NTIS PB87-201034), Office of Emergency and Remedial
       Response, Washington, DC, October 1985.
 47.    U.S. Environmental  Protection Agency, So//d Waste  Disposal Facility Criteria,  Final
       Rule, October 9, 1991, Office of Solid Waste and Emergency Response, Washington,
       DC, OSWFR91004,1991.
 48.    U.S.  Environmental  Protection  Agency,   So//d Waste Disposal Facility Criteria  -
       Technical Manual, EPA 530-R-93-017 (NTIS PB94-100-450), Washington,  DC, 1993.
 49.    U.S. Environmental Protection Agency,  Statistical Analysis of Groundwater Monitoring
       Data at RCRA Facilities-Interim Final Guidance, EPA/530-SW-89-026  (NTIS PB89-
       151047), Office of Solid Waste, Washington, DC, February 1989.
 50.    U.S. Environmental Protection Agency, Summary  of Data on Municipal  Solid Waste
       Landfill Leachate Characteristics - Criteria for Municipal Solid Waste Landfills (40 CFR
       Part 258) - Subtitle  D of the Resource Recovery and Conservation Act, July  1988,
       Office of Solid Waste and Emergency Response, Washington, DC, EPA/530-SW-88-
       038 (NTIS PB88-242441), 1988.
51.    U.S. Environmental Protection Agency, Technical Guidance Document: Final Covers on
       Hazardous  Waste Landfills and Surface Impoundments, EPA/530-SW-89-047  (NTIS
       PB89-233480), Office of Solid Waste and Emergency  Response, Washington,  DC,
       1989.
                                                                                A-4

-------
52.   U.S. Environmental Protection Agency, Test Methods for Evaluating Solid Wastes:
      Physical/Chemical Methods, Third Edition as amended by Updates I and II, SW-846
      (NTIS PB88-239223), Office of Solid Waste and Emergency Response, Washington,
      DC, 1986.
53.   U.S.  Navy,  "Design  Manual-Soil Mechanics, Foundations  and  Earth  Structures,"
      NAVFAC DM-7, Department of the Navy, Washington, DC, September 1986.
54.   Van der Heijde, P.K. and O.A. Eluawawy, Compilation of Ground-Water Models, EPA-
      600/R-93-118 (NTIS PB93-209401), Office of Solid Waste, Washington, DC, 1993.
55.   Watson, T., "Recycling the Landfill: The Mining of Disposal Sites," Resource Recycling,
      September/October 1988.
                                                                              A-5

-------
TECHNICAL REPORT DATA
1. REPORT NO. 2
EPA-600/R- 98-040
4. TITLE AND SUBTITLE
Guidance for Landfilling Waste in Economically
Developing Countries
/.AUTHORS) G. Savage, L.Diaz, and C.Golueke (Calfte-
covery); and C. Martone (Weston)
a. PERFORMING ORGANIZATION NAME AND ADDRESS
CalRecovery, Inc. Roy F. Weston, Inc.
725C Alfred Nobel Dr. 7 Eagle Square
Hercules, CA 94547 Concord. NH 03301
12. SPONSORING AGENCY NAME AND ADDRESS
EPA, Office of Research and Development*
Air Pollution Prevention and Control Division
Research Triangle Park, NC 27711
3. RECIPIENT'S ACCESSION NO.
5. REPORT DATE
April 1998
6. PERFORMING ORGANIZATION CODE
8. PERFORMING ORGANIZATION REPORT NO.
10. PROGRAM ELEMENT NO.
11. CONTRACT/GRANT NO.
68-C4-0022 (Weston)
13. TYPE OF REPORT AND PERIOD COVERED
Final; 6/95 - 8/97
14. SPONSORING AGENCY CODE
EPA/600/13
is. SUPPLEMENTARY NOTESAPPCD project officer is Susan A. Thorneloe, Mail Drop 83, 919 / 1
541-2709. (*) Cosponsored by the International Solid Waste A ssoc. . Copenhagen, K,
Denmark.
 16. ABSTRACT
               repOrt offers guidance on all aspects of the planning, design, andim-
 plementation of landfills in economically developing countries. The intended audience
 includes municipal officials,  solid waste managers, engineers,  and planners.  The
 report* s 18 chapters include critical technical areas such as siting, design,  and
 operation of landfills. Equally important non- technical aspects such as social, eco-
 nomic, and institutional topics relevant  to developing landfills in economically de-
 veloping countries are also discussed. The guiding, principle of the report is the
 application of acceptable landfill practices within the  conditions and availability of
 resources prevailing in both large urban cities and small communities in economi-
 cally developing countries.
17. KEY WORDS AND DOCUMENT ANALYSIS |
1. DESCRIPTORS
Pollution
Wastes
Earth Fills
Sites
Waste Disposal
Operating Costs
18. DISTRIBUTION STATEMENT
Release to Public
b.lDENTIFIERS/OPEN ENDED TERMS
Pollution Prevention
Stationary Sources
19. SECURITY CLASS (This Report)
Unclassified
20. SECURITY CLASS (This page)
Unclassified
c. COSATI Field/Group |
13B
14G
13C
15E
14 A. 05A
21. NO. OF PAGES 1
400 1
22. PRICE 1
EPA Form 2220-1 (9-73)
A-6

-------