&EPA
United States
Environmental Protection
Agency
                   Industrial Environmental Research  EPA-600/7-79-022c
                   Laboratory          May 1979
                   Research Triangle Park NC 2771 1
EPA Utility FGD Survey:
December 1978 -
January  1979

Interagency
Energy/Environment
R&D Program Report

-------
                  RESEARCH REPORTING SERIES


 Research reports of the Office of Research and Development, U.S. Environmental
 Protection Agency, have been grouped into nine series. These nine broad cate-
 gories were established to facilitate further development and application of en-
 vironmental technology.  Elimination  of  traditional grouping was consciously
 planned to foster technology transfer and a maximum interface in related fields.
 The nine series are:

     1. Environmental Health Effects Research

     2. Environmental Protection Technology

     3. Ecological Research

     4. Environmental Monitoring

     5. Socioeconomic Environmental  Studies

     6.  Scientific and Technical Assessment Reports (STAR)

     7.  Interagency Energy-Environment Research and Development

     8.  "Special" Reports

    9.  Miscellaneous Reports

 This report has been assigned to the INTERAGENCY ENERGY-ENVIRONMENT
 RESEARCH AND DEVELOPMENT series. Reports in this series result from the
 effort funded under the 17-agency Federal Energy/Environment Research and
 Development Program. These studies relate to EPA's mission to protect the public
 health and welfare from adverse effects of pollutants associated with energy sys-
 tems. The goal of the Program is to assure the rapid development of domestic
 energy supplies in an environmentally-compatible manner by providing the nec-
 essary environmental data and control technology. Investigations include analy-
 ses of the transport of energy-related pollutants and their health and ecological
 effects;  assessments  of, and development of, control technologies for energy
 systems; and integrated assessments of a wide range of energy-related environ-
 mental issues.
                        EPA REVIEW NOTICE
This report has been reviewed by the participating Federal Agencies, and approved
for publication. Approval does not signify that the contents necessarily reflect
the views and policies of the Government, nor does mention of trade names or
commercial products constitute endorsement or recommendation for use.

This document is available to the public through the National Technical Informa-
tion Service, Springfield, Virginia 22161.

-------
                                              EPA-600/7-79-022C

                                                          May 1979
             EPA  Utility  FGD  Survey:
       December  1978  - January  1979
                                by

                       M. Smith, M. Melia, T. Koger,
                        R, McKibben, and J. Uihlein

                        PEDCo. Environmental, Inc.
                          11499 Chester Road
                         Cincinnati, Ohio 45246
                        Contract No. 68-02-2603
                             Task No, 48
                       Program Element No. EHE624
                          EPA Project Officers:

            N. Kaplan                               J.C. Herlihy

Industrial Environmental Research Laboratory         Division of Stationary Source Enforcement
  Office of Energy, Minerals, and Industry                  Office of Enforcement
    Research Triangle Park, NC 27711                   Washington, DC 20460


                            Prepared for

                 U.S. ENVIRONMENTAL PROTECTION AGENCY
                     Office of Research and Development
                         Washington, DC 20460

-------
                             NOTICE


     This report, (prepared by PEDCo Environmental, Inc., Cincin-
nati, Ohio, under EPA Contract No. 68-02-2603, Task No. 48) is
provided as an information transfer document.  Data in this
report are supplied voluntarily by utility representatives; flue
gas desulfurization (FGD) system designers, and suppliers; regu-
latory personnel; and others.  Neither EPA nor the designated
contractor warrants the accuracy or completeness of information
contained in this report.

     This report is the first in a series of four issues.  The
succeeding three issues will be supplemental in nature.  It is
suggested that the, user retain this issue for reference
throughout the year, because much of the information contained in
this report~will not be published again until around March 1980.
Supplemental issues wTTi be cumulative, so that it will be neces-
sary only to retain the latest issue and this report to have all
available information.

     Initial distribution of the report (generally, one copy per
company) is limited to organizations and individuals indicating a
specific interest in the field of FGD technology.  Additional
copies of this report and succeeding issues can be purchased from
National Technical Information Service, Springfield, Virginia
22151.
                               ii

-------
                            CONTENTS
Notice
Tables
Executive Summary and Highlights

Section I Summary List of FGD Systems

Section 2 Status of FGD Systems

Section 3 Design and Performance Data for Operational
           FGD Systems
          Alabama Electric
               Tombigbee 2
          Arizona .Electric Power
               Apache 2
          Arizona Public Service
               Cholla 1
               Choila 2
          Central Illinois Light
               Duck Creek 1
          Columbus and Southern Ohio Electric
               Conesville 5
               Conesville 6
          Duquesne Light
               Elrama 1™4
               Phillips 1-6
          Gulf Power
               Scholz 1,2
          Indianapolis Power and Light
               Petersburg 3
          Kansas City Power and Light
               Hawthorn 3
               Hawthorn 4
               La Cygne 1
          Kansas Power and Light
               Jeffrey 1
               Lawrence 4
               Lawrence 5
          Kentucky Utilities
               Green River 1-3
Page

 ii
 vi
vii

  1

  6

 33


 33

 35

 38
 51

 54

 59
 67

 71
 80

 95

 97

101
109
117

132
135
143

149
                               iii

-------
                      CONTENTS (continued)

                                                           Page

          Louisville Gas and Electric
               Cane Run 4                                   156
               Cane Run 5                                   161
               Mill Creek 3                                 164
               Paddy's Run 6                                166
          Minnkota Power Cooperative
               Milton R. Young 2                            175
          Montana Power
               Colstrip 1                                   180
               Colstrip 2                                   184
          Nevada Power
               Reid Gardner 1                               187
               Reid Gardner 2                               198
               Reid Gardner 3                               214
          Northern Indiana Public Service
               Dean H. Mitchell 11                          225
          Northern States Power
               Sherburne 1                                  234
               Sherburne 2                                  248
          Pennsylvania Power
               Bruce Mansfield 1                            259
               Bruce Mansfield 2                            273
          Philadelphia Electric
               Eddystone 1A                                 279
          Public Service Company of New Mexico
               San Juan 1                                   286
               San Juan 2                                   290
          Southern Carolina Public Service Authority
               Winyah 2                                     293
          Southern Mississippi Electric
               R. D. Morrow 1                               296
          Springfield City Utilities
               Southwest 1                                  298
          Tennessee Valley Authority
               Shawnee 10A                                  306
               Shawnee 10B                                  308
               Widows Creek 8                               320
          Texas Utilities
               Martin Lake 1                                328
               Martin Lake 2                                332
               Monticello 3                                 335
          Utah Power and Light
               Huntington 1                                 338

Section 4 Summary of FGD Systems by Company                 341

Section 5 Summary of FGD Systems by System Supplier         342
                               IV

-------
                      CONTENTS (continued)

                                                          Page

Section 6   Summary of FGD Systems by Process              344

Section 7   Summary of Operating FGD Systems by Process    345
            and Unit

Section 8   Summary of End-Product Disposal Practices      347
            for Operational FGD Systems

Section 9   Summary of FGD Systems in Operation            349

Section 10  Summary of FGD Systems Under Construction      351

Section 11  Summary of Contract Awarded FGD Systems        353

Section 12  Summary of Planned FGD Systems                 354

Section 13  Total FGD Units and Capacity (MW) Installed    356
            by Year

Section 14  Design and Performance Data for Operational    357
            Particulate Scrubbers

Appendix A  FGD System Cost Data:  Operational and
            Nonoperational Systems                         A-l
            A-l  Major FGD System Equipment Summary        A-7
            A-2  Cost Element Factors                      A-12
            A-3  Description of Cost                       A-15
            A-4  Categorical Results of Reported and
                 Adjusted Capital and Annual Costs for
                 Operational FGD Systems                   A-18
            A-5  Costs for Operational FGD Systems         A-19
            A-6  Costs for Non-Operational FGD Systems     A-23

Appendix B  FGD Process Flow Diagrams                      B-l

Appendix C  Definitions                                    C-l

Appendix D  Glossary of Units                              D-l
                                v

-------
                             TABLES


No.                                                         gage

  I  Number and Total Capacity of FGD Systems                vii

 II  Summary of Changes, December 1978-January 1979           ix

III  Performance of Operational Units, December 1978-
     January 1979                                 ,             x
                                VI

-------
                        EXECUTIVE SUMMARY
This report has been prepared every other month by PEDCo
Environmental, Inc., under contract to the Industrial Environmental
Research Laboratory/Research Triangle Park and the Division of
Stationary Source Enforcement of the U.S. Environmental Protection
Agency.  After the February-March 1979 issue, reports will be
issued quarterly (every three months).  This is the first issue
generated by a new computerized data base system, the structure
of which is illustrated in Figure 1.  This issue differs from the
previous ones in that the scope of design data for operating FGD
systems is vastly expanded, section formats are revised somewhat
and a new section includes operational particulate scrubbers.

Table I summarizes the status of FGD systems in the United States
during December 1978 and January 1979.  Table II lists the units
that changed status in this period, and Table III shows the
performance of operating units.

       TABLE I.  NUMBER AND TOTAL CAPACITY OF FGD SYSTEMS
Status
Operational
Under construction
Planned:
Contract awarded
Letter of intent
Requesting/evaluating bids
Considering only FGD
systems
TOTAL
No. of
Units
46
45

21
2
11
33
158
Total
Controlled
Capacity, MW*
16,842
18,927

11,647
1,100
9,156
17,784
75,456
Equivalent
Scrubbed ...
Capacity, MWT
15,773
16,924

11,071
960
8,268
17,014
70,010
* Total Controlled Capacity (TCC) is the summation of the gross
  unit capacities (MW) brought into compliance with FGD systems
  regardless of the percent of the flue gas scrubbed by the FGD
  system(s).

  Equivalent Scrubbed Capacity (ESC) is the summation of the ef-
  fective scrubbed flue gas in equivalent MW based on the percent
  of the flue gas, scrubbed by the FGD system(s).
                               vii

-------
Figure 1.  Computerized data base structure diagram.

-------
         TABLE  II.   SUMMARY  OF CHANGES:   FGP  SUMMARY  REPORT,
                        DECEMBER  1978 - JANUARY  1979
FOB status report
11/30/78
Allegheny rower
Hitahell 3
Cincinnati Sas & Electric
East Bend 2
Houston Light & rower
rarish 8
Louisville (Us & lleetrio
Srimble county l
Louisville Sas & Xleetrie
Trimble County 2
Middle south Utilities
Arkansas Coal 5
Middle south utilities
Arkansas Coal 6
Middle South Utilities
Louisiana Goal 1
Middle South utilities
Louisiana Coal 2
Middle South utilities
Miieissippi Coal 1
Middle South utilities
Miseiaeippl Coal 2
Northern States power
Sherburne 4
rower Authority of New York
Arthur Kill Plant
Southern California Zdison
Alanltoi 6
Tennessee Valley Authority
Cumberland
Tennessee Valley Authority
Johnsonville
Tennessee Valley Authority
Paradise 1
Tennessee Valley Authority
Paradise 2
Texas Power & Light
Sandow 4
Texas Utilities'
• Mill Creek 1
Texas Utilities
Mill Creek 2
TOTAL*
Operational
No.
46





















46
MW*
18,773





















15,773
Under
construction
NO,
43

*1
















+1


45
MW»
15,892

610
















382


16,924
Contract
awarded
No.
20

-1











+1


+1
+1
-1


21
MW*
10,820

6BO











178


704
704
382


11,071
Letter of
Intent
No.
3











• 1









2
MW*
1,820











860









960
Requesting/
evaluating bids
No,
I


+1


•H
+1
+1
.1
+1
+1




+1
-1
-1



11
MW*
3,224


512


810
890
890
890
890
890




600
704
704



8, 268
Considering
only FGD
NO.
27
+1


+1
il







+1

+ 1
-1



tl
+1
33
MW*
13,364
300


S7S
S7S







700

600
600



750
750
17,014
Total
No.
144
+1

+1
+1
+1
•H
+1
+1
tl
+1
+1
-1
+1
+1
+1




+1
+1
158
MW"
60,593
300

112
175
§7S
840
890
890
690
890
890
860
700
175
600




750
750
70,010
Equivalent Scrubbed Capacity (ai a remit of the converaion to equivalent scrubbed capacity valuee, the totals as of
11/30/78 shown above have been modified accordingly and will therefore differ from the totals reported in the
October-November 1978 Summary Report).
                                             3LX

-------
               TABLE  HI.     PERFORMANCE  OF  OPERATIONAL  UNITS
                             DECEMBER  1978  -  JANUARY  1979

Plant
Tomblgbee 2
Apache 2
Choi la 1
Choi la 2
Duck Creek 1
Coneivllle 5
Conesvllle 6
Elrama
Phillips
Scholz 1-2
Petersburg 3
Hawthorn 3
Hawthorn 4
LaCygne
Jeffrey 1
Lawrence 4
Lawrence 6
Green Rivera 1-3
Cane Run 4
Cane Run 8
Mill Creek 3
Paddy 'i Run 6
Milton 8. Young 2
ColstMp 1
Colstrlp 2
Reid Qerdner 1
Reid Gerdner 2
Raid Gardner 3
Dean H. Mitchell 11
Sherburno 1
Sherburna 2
Bruce Manaflald 1
Bruce Mansfield 2
Eddyetone 1A
San Juan 1
San Juan 2
Wlnyah 2
A.O, Morrow 1
Southwest 1
Shiwnte 10A
Shawnet 108
Widows Creek 8
Martin Lake 1
Martin Lake 2
Montlcello 3
Hunting ton 1
TOTAL

FGD system
capacity,
179
180
119
350
416
411
411
510
410
23
532
110
110
874
540
125
420
64
190
200
426
70
405
358
358
125
125
126
116
720
720
917
917
120
361
•350
140
124
194
10
10
650
898
696
800
86(
16,269

Flue gas,
% scrubbed
70
100
100
100
100
100
100
100
100
N/Ad
100
100
100
100
76
100
100
100
100
100
100
100
86
100
100
100
100
100
100
100
100
100
100
N/Ad
100
100
60
62
100
N/A"
N/A"
100
78
76
100
86

FGO capacity
on line
during
'•Jlflj-
179

119
360
416
411
411
610
410
23
532
110
110
874
540
125
420


200


405
358
368
125
125
126
115
720
720
917
917
120
361
360
140
124
194
10
10

595
598
800
866
14,790

No Information
for this
period,
MW















































Shut down
through-
out
period,
MW

180















64
190

425
70



















550




1,479

FGD system
availability,
Dec.
95



20
20
31






94





53





96
96
100
64
94
97





86

63








Jan.
95



0
0
0






96





70





64
83
66
28
94
93





99

21









FGD system
operabjllty,
Dec.


88

21
18
23


100









46





93
100
100








63

66






34

Jan.


99

0
0
0


100









67





74
61
67








99

25






76


FGD system
reliability,
Dec.


88

21
19
23












46





93
100
100
72







83

86








Jan.


99

0
0
0












67





74
81
6?
28







99

25









FGD system
utilisation,
Dec.


aa

20
15
21
79
74










41





92
13
100
64







82

49






33

Jan.


99

0
0
0
78
72










63





67
74
66
28







99

IB






66

' Equivalent tcrubbed capacity.

' Th1i category Includes tht flue gat capacity being handled by the FGD eyitem at least part of the tint during the report period,

c Tht percent figures listed art ivtrage values for all lyttem scrubbing trtlni during the period.

d Flu* gai % scrubbed for prototype and demonstration unit* 1s not applicable unless the lyitem 1i dulgned to bring a unit Into compliance with
 So, emission standards.

-------
The total power generating capacity of the electric utility
industry in the United States is now approximately 564 GW.
Coal-fired units account for approximately 265 GVr or 47% of this
total.  As indicated in Table I, 46 power generating units (all
coal-fired) are now equipped with operating FGD systems.  These
units represent a total controlled capacity of 16,842 MW, which
is 3% of the total utility power generating capacity and just
over 6% of the utility coal-fired capacity.  Projections indicate
that the total power generating capacity of the U.S. electric
utility industry will be approximately 878 GW by 1988,  an in-
crease of 56% over the present total.  (This value reflects the
annual loss resulting from the retirement of older units, which
is considered to be 0.4% of the average generating capacity at
the end of each year.)  Approximately 395 GW ' '  or 45% of the
1988 total will come from coal-fired units.  Of the 158 FGD-
equipped units (75,456 MW) shown in Table I, 156 (74,891 MW) are
scheduled for operation by 1988.  Therefore, approximately 8.5%
of the projected total generating capacity and nearly 19% of the
projected coal-fired capacity will be controlled by FGD by the
end of 1988.

             HIGHLIGHTS:  DECEMBER 1978-JANUARY 1979

The following paragraphs highlight FGD system developments during
December 1978 and January 1979.

Allegheny Power System (APS) plans to install an FGD system on
Mitchell 3, a 300-MW (gross) coal-fired unit located in Courtney,
Pennsylvania.  The FGD system is currently scheduled to start up
in August 1982.  Design S02 removal efficiency is 95%.  APS has
not yet selected a process or system supplier.  Bid request and
evaluation will probably commence in September 1979.

Arizona Public Service reported that the Cholla 1 FGD system
remained in service during the report period.  The FGD system's
average reliability for December and January was 88 and 99%,
respectively.  The boiler was in service 744 hours during each
month.

Cincinnati Gas and Electric reported that construction began on
the utility's 650 MW (Gross) East Bend 2 FGD installation.  The
B&W lime slurry system is designed to remove SO, with an 87%
efficiency.  A contract was awarded to IUCS for the sludge dis-
posal system.

The Thoroughbred 121 prototype FGD system retrofitted on Gulf
Power's Scholz 1 and 2 units achieved 100% operability during
December and January.  The Thoroughbred 121 facility removes S02
and flyash from an effective 23 MW capacity slip stream drawn
from the two 47 MW (gross) Scholz units,  chiyoda International,
the system supplier, reported that removal efficiencies for S02
have ranged from 93 to 95%.
                                XI

-------
Houston Lighting and Power reported that bids are now being
requested for an FGD system planned for W.A. Parish 8, a new
550-MW coal-fired unit scheduled for start up in late 1982.  The
utility plans to equip the unit with a fabric filter for partic-
ulate matter control and a wet limestone FGD system for S0~
control.

Kansas City Power and Light reported that the LaCygne 1 FGD
system was in service during the report period, achieving average
system availabilities of 94 and 96% for the months of December
and January, respectively.  Unit power production was limited by
a number of boiler-related outages during the period, resulting
in unit service times of 239 and 205 hours for December and
January, respectively.

Louisville Gas and Electric (LG&E) reported that they are plan-
ning a new coal-fired power-generating station for installation
in Bedford, Kentucky.  The first two units of this new station,
known as Trimble County, are each 575-MW (gross) pulverized
coal-fired boilers supplied by Combustion Engineering.  Each unit
will be equipped with an electrostatic precipitator for the
particulate matter control and an FGD system for SO, control.
LG&E has not yet selected a process or supplier.  Trimble County
1 is scheduled to start up in July 1984 and Trimble County 2
sometime in 1986.

Middle South Utilities reported that bid request and evaluation
is now proceeding for six new 890-MW (gross) coal-fired boilers
planned for installation at three separate stations in the util-
ity's power-generating network.  These new units are identified
as Arkansas Coal 5 and 6, Louisiana Coal 1 and 2, and Mississippi
Coal 1 and 2.  The steam generators are pulverized coal-fired
units supplied by Babcock and Wilcox.  Either a low sulfur west-
ern grade of coal or lignite, with an average sulfur content of
0.5%, will be burned in the units.  Currently, Middle South
Utilities plans to start up Arkansas Coal 5 and 6 in January 1986
and January 1988, respectively; Louisiana Coal 1 and 2 in January
1986 and January 1988, respectively; and Mississippi Coal 1 and 2
in January 1985 and January 1987.

Nevada Power reported that the FGD systems for Reid Gardner 1, 2,
and 3 were in service during December.  FGD system availabilities
for the month were 96, 96, and 100%, respectively.

Northern States Power reported that the FGD system availability
for Sherburne 1 was 94% in both December and January and that the
FGD system availability for Sherburne 2 was 97% in December and
93% in January.
                               xii

-------
A contract was awarded by SOHIO to Southern California Edison and
Stearns-Roger for the installation of a lime FGD system on
Southern California Edison's Alamitos 6 unit.  This contractural
agreement occurred as a result of an "emission offset" program
that may enable SOHIO to build an oil terminal and storage  facil-
ity at Long Beach, California.  The contract requires Sohio to
supply 100% of the FGD system capital cost and projected operat-
ing costs for a period of 15 years.  The FGD system will scrub
approximately one-third of the flue gas generated by the 480-MW
Alamitos 6 unit.  Alamitos 6 burns natural gas and oil (0.25%
maximum sulfur content).  The utility will use a horizontal spray
tower to remove 95% of the SO, from the inlet gas stream to the
scrubber.  Sludge will be dried and trucked to a landfill.  The
FGD system is expected to be operating commercially by January
1982.

The Tennessee Valley Authority reported the following information
for their FGD activities at the Cumberland, Johnsonville, and
Paradise stations:

0    TVA is planning to install a 600-MW equivalent FGD system at
     their existing 1300-MW (gross) coal-fired Cumberland Sta-
     tion.  The system will be designed to remove 90% of the
     inlet SO-.  A process or system supplier has not been  an-
     nounced.  If a lime or limestone system is selected, start
     up could occur as early as July 1982.

0    TVA is requesting and evaluating bids for a 600-MW equiva-
     lent FGD system at their existing 1450-MW (gross) coal-fired
     Johnsonville Station.  The system will use regenerable
     magnesium oxide scrubbing to remove 90% of the inlet SO,.
     The system is scheduled to start up in December 1982.

0    TVA has awarded a contract to Chemico for two limestone FGD
     systems for Paradise 1 and 2, two existing coal-fired  units
     each rated at 704 MW (gross).  Each system will include six
     scrubber modules, five of which are required for full  load.
     Design SO. removal efficiency is 84.2%.  The systems are
     scheduled to start up in 1982.

Texas Air Control Board reported that Texas utilities plans to
install an FGD system on their Mill Creek 1 and 2 lignite-fired
units, located southwest of their Martin Lake station.  An  FGD
process has not yet been selected for the new 750 MW (gross)
units, but the utility has decided to control particulate matter
with electrostatic precipitators.  Currently start-up dates are
scheduled for 1985 and 1986 for units 1 and 3, respectively.

Virginia Electric and Power reported that state SO- emission
requirement revisions will now allow the utility to operate Mt.
Storm station without retrofitting the facility with an FGD
system.  The station has been deleted from the Utility FGD  Survey
Report.

                               xiii

-------
Winyah 2 of South Carolina Public Service Authority achieved an
FGD system availability of better than 99% in January.  The
boiler operated 744 hours and the FGD system operated 742 hours.
                                xiv

-------
                REFERENCES FOR EXECUTIVE SUMMARY


a.   Sixth Biennial Survey of Power Equipment Requirements of the
     U.S. Electric Utility Industry:  1977-1986.  Sponsored by
     the Power Equipment Division, National Electrical Manu-
     facturers Association.

b.   Temple, Barker, and Sloane, Inc.  Policy Testing Model for
     Electric Utilities, Exhibit I1-3.

c.   Twelth Annual Power Engineering Survey, Power Engineering,
     April 1978.
                               XV

-------
                                           EPA UTILITY  F6D  SURVEY: DECEMBER 1978 - JANUARY 1979

                                           SECTION  1
                                  SUKfARY LIST OF F6D SYSTEMS
COMPANY NAME/
UNIT NAME
ALABAMA ELECTRIC COOP
TOMBIGBEE
TOMBIGpfE
ALLEGHENY POWER SYSTEM
MITCHELL
PLEASANTS
PLEASANTS
ARIZONA ELECTRIC POWER COCP
APACHE
APACHE
ARIZONA PUfeLIC SfHVlCt
CHOLLA
CHOLLA
CHOLLA
FOUR CORNERS
FOUR CORNERS
FOUR CORNERS
FOUR CORNERS
FOUR CORNERS
ASSOCIATED ELECTRIC COOP
THOMAS HILL
BASIN ELECTRIC POWER COOP
ANTELOPE VALLEY
ANTELOPE VALLEY
LARAMIi RIVER
LARAftlE RIVER
LARAMIE RIVER
616 RIVERS ELECTRIC
GREEN
GREEN
CENTRAL ILLINOIS LIGHT
eUCK CREEK
DUCK CREEK
CENTRAL ILLINOIS PUBLIC SEftV
NEWTON
CENTRAL MAINE POWER
SEARS ISLAND
CINCINNATI GAS t ELECTRIC
EAST BEND
COLORADO UTE ELECTRIC ASSK.
CRAIG
CRAIG
COLUMBUS t SOUTHERN OHIO ELECc
CONESVILLE
CONESVILLE
POSTON
POSTON
UNIT Nf.

2
3

3
1
2

2
3

1
2
4
1
2
3
4
S

3

1
2
1
2
3

1
2

1
2

1

1

2

1
2
»
5
6
5
6
UNIT LOCATION

LERCt
LEROY

COURTNEY
BELKONT
BELMONT

COCHISE
COCHISE

JOSEPH CITY
JOSEPH CITY
JOSEPH CITY
FARMINETON
FARMIN6TON
FASMINGTON
FAROINGTON
FARMINGf ON

MOBF.RLY

BEULAH
BEULAH
WHEATLAND
WHEATLAND
WHEATLAND

SEBREE
SEBREE

CANTON
CANTON

NEWTON

PENOBSCOT BAY

RABBITHASH

CRAIG
CRAIG

CONESVILLE
CONESVILLE
ATHENS
ATHENS


ALABAMA
ALAPAMA

PENNSYLVANIA
WEST VIRGINIA
WEST VIRGINIA

A" nONA
ARIZONA

ARIZONA
ARIZONA
ARIZONA
NEW MEXICO
NEW MEXICO
NEW MEXICO
NPW MEXICO
NEW MEXICO

MISSOURI

NORTH DAKOTA
NORTH DAKOTA
WYOMING
WYGWING
WYOMING

KENTUCKY
KENTUCKY

ILLINOIS
ILLINOIS

ILLINOIS

MAINE

KENTUCKY

COLORADO
COLORADO

OHIO
OHIO
OHIO
OHIO
START-UP
DATE

9/78
6/79

8/82
3/79
3/80

e/78
4/79

10/73
4/78
6/80
0/79
0/79
C/79
Q/S2
0/82

1/82

11/81
11/83
4/80
10/80
4/82

12/79
12/80

7/76
1/84

11/79

11/87

10/81

3/79
3/79

1/77
6/78
0/83
0/85
STATUS

1
2

6
2
2

1
2

1
1
2
Z
2
2
3
3

3

3
6
2
2
3

2
2

1
5

2

6

2

2
2

1
1
6
6
REG
CLASS

A
A

B
A
A

B
B

B
(1
t>
e
e
e
e
e

A

e
e
A
A
A

•A
A

A
A

A

A

A

B
B

e
e
B
e
1.  OPERATIONAL  UNITS
2.  UNITS UNDER  CONSTRUCTION
3.  PLANNED - CONTRACT  AWARDED
4.  PLANNED - LETTER OF    INTENT SI6NFD
5.  PLANNED - REQUESTING/EVALUATING BIDS
6.  PLANNED - CONSIDERING ONLY  F60 SYSTEMS
7.  PLANNED - CONSIDERING F6D SYSTEMS; ALSO  ALTERNATIVE  METHODS
A.  BOILER CONSTRUCTED  SUBJECT TO FEDERAL NSPS
E"   BOILER SUBJECT  TO STATE STANDARD THAT IS MORE STRINGENT THAN THE FEDERAL NSPS
C.  BOILER SUBJECT  TO STATE STANDARD THAT IS E8UAL TO OR LESS STRINGENT THAN NSPS
0.  OTHER
E.  REGULATORY CLASS  UNKNOWN

-------
EPA UTILITY F6D SURVEY:  DECEMBER  1978 - JANUARY 1979
                                              SECTION 1
                                     SUWARY LIST OF FGD SYSTEMS
COMPANY NAME/
UNIT NAPE
COMMONWEALTH EDISON
POWERTON
COOPERATIVE poWER ASSOCIATION
COAL CREEK
COAL CREEK
DELMARVA POWER & LIGHT
DELAWARE CITY
DU8UESNE LI6HT
ELRANA
PHILLIPS
EAST KENTUCKY POWER COOP
SPURLOCK
GENERAt PUBLIC UTILITIES
COHO
SEWARD
GULF POWER
SCHOL7.
HCOSUR ENERGY
MEBOW
MEROIH
HOUSTON LIGHTING ft POWER CO.
W.A. PARISH
INDIANAPOLIS POWER * LIGHT
PETERSBURG
PETERSBURG
KANSAS CITY POWER 8 LIGHT
HAWTHORN
HAWTHORN
LA CY6NE
KANSAS POWER & LIGHT
JEFFREY
JEFFREY
LAWRENCE
KENTUCKY UTILITIES
GREEN RIVER
LAKELAND UTILITIES
HC IK TOSH
LOUISVILLE CAS t ELECTRIC
CANE RUN
CANE RUN
CANE PUN
MILL CRfcEK
MILL CREEK
MILL CREEK
MILL CREEK
. PADDY'S RUN
1. OPERATIONAL UNiTS
?. UNITS UNDER CONSTRUCTION
i. PLANNED - CONTRACT AWARDED
UNIT NC. UNIT LOCATION
51
1
2
1-2
1-t
2
1
7
1.2
1
2
e
3
4
3
t
1
1
2
4
5
1-3
3
4
5
1
2
3
6
si
6.
7.
PERKIN
UNDERWOOD
UNDERWOOD
DELAWARE ClT^
' ELRAMA
SOUTH HEIGHT
WAYSV1LLI-
ERIE
SEWARD
CHATTAHOOCHEE
SULLIVAN
SULLIVAN
BOOTH
PETERSBURG
PETERSBURG
KANSAS CITY
KANSAS CITY
LA CY6NE
NAME: 60
LAWRENCE
LAWRENCE
CENTRAL CITY
LAKELAND
LOUISVILLE
LOUISVILLE
LOUISVILLE
LOUISVILLE
LOUISVILLE
LOUISVILLE
LOUISVILLE
LOUISVILLE
ILLINOIS
NORTH DAKOTA
NORTH DAKOTA
DELAWARE
PENNSYLVANIA
PENNSYLVANIA
KENTUCKY
PENNSYLVANIA
PENNSYLVANIA
FLORIDA
INDIANA
INDIANA
TEXAS
INDIANA
INDIANA
MISSOURI
MISSOURI
KANSAS
KANSAS
KANSAS
KASTSAS
KANSAS
KENTUCKY
FLCRIDA
KENTUCKY
KENTUCKY
KENTUCKY
KENTUCKY
KENTUCKY
KENTUCKY
KENTUCKY
KENTUCKY
START-UP R|!-6
DATE STATUS CLASS
7/79
5/79
10/80
4/80
10/75
7/73
3/80
5/88
5/85
8/78
4/81
1/82
10/82
12/77
10/83
11/72
8/72
2/73
6/78
6/80
1/76
11/71
9/75
10/81
12/77
3/79
A/81
4/82
8/78
7/81
4/73
2
2
2
2
1
1
3
6
6
1
2
2
5
1
2
1
1
1
1
2
1
1
1
3
1
1
2
2
3
1
2
1
PLANNED - LETTER OF INTENT SIGNED
PLANNED - REQUESTING/EVALUATING BIDS
PUNNED - CONSIDERING ONLY FGD SYSTEMS
PLANNED - CONSIDERING FSD SYSTEMS* ALSO ALTERNATIVE
C
A
A
C
B
e
A
A
A
C
A
A
A
A
A
B
B
C
B
B
B
C
A
A
A
A
B
B
B
B
C
METHODS
A. BOILER CONSTRUCTED SUBJECT TO flBIRAl NSPS
B BOILER SUBJECT TO STATE STANDARD THAT IS MORI STRINGENT THAN THI FEDERAL NSP!
tl llllll SUBJICT TO STATE STANDARD THAT IS EQUAL TO OR LISS STRINSBNT THAN NSPS
D. OTHER
t. REGULATORY CLASS UNKNCWN

-------
                                            EPA UTILITY  F6D  SURVEY;  DECEMBER 1978 - JANUARY 1979
                                            SECTION  1
                                   SUMMARY LIST OF FGD SYSTEMS
COMPANY KANE/
UNIT NA«£
LOUISVILLE GAS I ELECTRIC
TRIABLE COUNTY
TRIMBLE COUNTY
MIDDLE SOUTH UTILITIES
ARKANSAS COAL
ARKANSAS COAL
LOUISIANA COAL
LOUISIANA COAL
MISSISSIPPI COAL
MISSISSIPPI COAL
UNIT Nt. UNIT LOCATION

1 BEDFORD
2 BEDFORD

5
6
1
2
1
2


KENTUCKY
KENTUCKY

ARKANSAS
ARKANSAS
LOUSIANA
LOUSIANA
MISSISSIPPI
MISSISSIPPI
START-UP
DATE

7/84
0/8*

1/86
1/88
0/86
0/88
0/85
0/87
STATUS

6
6

5
5
5
5
5
5
REG
CLASS

D
D

0
D
D
D
D
D
MINNESOTA POWER  R  LIGHT
   CLAY BOSWELL                 4

KINNKOTA POWER COOPERATIVE
   MILTON R.  YOUN6             2

MONTANA POWER
   COLSTR1P                     1
   COLSTPIP                     2
   COLSTRIP                     3
   COLSTRIP                     4

NEVADA POWER
   HARRY ALLEN                  1
   HARRY ALLEN                  2
   HARRY ALLEN                  3
   HARRY ALLEN                  *
   REID GARDNER                 1
   REID GARDNER                 2
   REID GARDNER                 3
   REID 6ARDNER                 4
   WARNER VALLEY               1
   WARNER VALLEY               2

HEW ENGLAND  ELECTRIC SYSTEM
   BRAYTON  POINT               3

NIAGARA MOHAWK  POWER COOP
   CHARLES  R. HUNTLEY          66

NORTHERN  INDIANA PUS SERVICE
   EAILLY                       7
   BAILLY                       8
   DEAN H.  MITCHELL            11

NORTHERN  STATES  POWER
   SHERBURNE                   1
   SHERBURNE                   2
   SHERBURNt                   3

OTTER  TAIL  POWER
   COYOTE                       1

PACIFIC CAS g ELECTRIC
   FOSSIL                       1
   FOSSIL                       2
        COHASSET
        CENTER
        COLSTRIP
        COLSTRIP
        COLSTRIP
        COLSTRIP
                       MINNESOTA
                       NORTH  DAKOTA
MONTANA
MONTANA
MONTANA
MONTANA
        N.E. LAS VEGAS NEVADA
        N.E » LAS VE6AS NEVADA
        N.E. LAS VEGAS NEVADA
        N.E. LAS VEGAS NEVADA
        MOAPA
        MOAPA
        MOAPA
        MOAPA
        ST. GEORGE
        ST. GEORGE
        SOMERSET
        BUFFALO
        CHESTERTON
        CHESTERTON
        GARY
        BECKER
        BECKER
        BECKER
        BEULAH
NEVADA
NEVADA
NEVADA
NEVADA
UTAH
UTAH
                       MASSACHUSETTS
                       NEW YORK
INDIANA
INDIANA
INDIANA
MINNESOTA
MINNESOTA
MINNESOTA
                       NORTH  DOKOTA
                        CALIFORNIA
                        CALIFORNIA
                                          5/80
                                          9/77
9/75
5/76
7/80
7/81
                                          O/  0
                                          0/82
O/ 0
01 0
7/76
3/76
*/77
5/84
                                          5/81
                  0/85
                  0/86
6/85
6/86
6/87
6/88
4/7*
*/74
6/76
0/83
6/84
6/85
6
t
6
6
1
1
1
6
6
6
A









8
B
e
 1.   OPERATIONAL UNITS
 2.   UNITS  UNDER CONSTRUCTION
 ?.   PLANNED  - CONTRACT AWARDED
*.  PLANNED - LETTER  OF     INTENT  SIGNED
5.  PLANNED - RE8UESTIN6/EVALUATIN6  BIDS
6.  PLANNED - CONSIDERING  ONLY  FGD SYSTEMS
?.  PLANNED - CONSIDERING  FGD SYSTEMS;  ALSO ALTERNATIVE METHODS
 A.   BOILER CONSTRUCTED SUEJECT TO  FEDERAL NSPS
 B.   BOILER SUBJECT TO STATE STANDARD  WAT IS  WORE STRINGENT THAN THE FEDERAL NSPS
 C.   BOILER SUBJECT TO STATE STANDARD  THAT IS  EQUAL TO OR LESS STRINGENT T«AN NSPS

 D.   OTHER
 F.   REGULATORY CLASS UNKNOWN

-------
EPA UTILITY FED SURVEY: DECEMBER 197S - JANUARY 1979
                                             SECTION 1
                                    SUMMARY LIST Of FGD SYSTEMS
COMPANY NAXIL/
UNIT NAME
PACIFIC POWER 8 LIGHT
JIM BR1DGER
PENNSYLVANIA POWER
BRUCE MANSFIELD
BRUCE MANSFIELD
BRUCE MANSFIELD
PHILADELPHIA ELECTRIC
CROMBY
EDDYSTONE
EDOYSTONfc
EDDYSTONE
POTOMAC ELECTRIC POWER
DICKERSON
POWER AUTHORITY OF NEW TO MS
ARTHUR KILL
PUBLIC SERVICE OF INDIANA
eiesoN
PUpLIC SERVICE OF NEW MEXICO
SAN JUAN
SAN JUAN
SAN JUAN
SAN JUAN
SALT RIVER PROJECT
CORONA 60
CO RON A 60
CORONADO
SAN MIGUEL ELECTRIC COOP
SAN MIGUEL
SEMJNOLE ELECTRIC
SEMINOLE
S IKES TON BOARD OF MUNIC. LTIL.
SIKESTON
SOUTH CAROLINA PUBLIC SERVICE
WINYAH
kllNYAH
SOUTHERN CALIFORNIA IBISOU
ALAMITCS
SOUTHERN ILLINOIS POVSR CCOP
MARION
MARION
SOUTHERN INDIANA 6AS & ELEC
A.B. BROWN
SOUTHERN MISSISSIPPI ELECTRIC
R.D. MORROW
ii.e. MORROW
UNIT I

4

1
2
3


1*
IB
2

4



3

1
2
3
4

1
2
3

1

1

1

2
3

t>

4
5

t

1
2
IC. UNIT LOCATION

ROCK SPRINGS

SHIPPINGPORT
SHIPPIN6PORT
SHIPPINGPORT

PHOFNIXVILLE
EDDYSTONE
tDDYSTONE
EDDYSTONE

DICKERSON

STATEN ISLAND

PRINCETON

WAT|RFLOW
UATFRFLOU
UATKRFLOW
WATER FLOW

ST. JOHNS
ST. JOHNS
ST. JOHNS

SAN MIGUEL

PALATKA

SIKESTON

GEORGETOWN
GEORGETOWN

SEAL BEACH

MARION
MARION

HIST FRANKLIN

HATTlSBUSe
HATTISBUR6


WYOMING

PENNSYLVANIA
PENNSYLVANIA
PENNSYLVANIA

PENNSYLVANIA
PENNSYLVANIA
PENNSYLVANIA
PENNSYLVANIA

MARYLAND

NEy YORK

INDIANA

NEW MEXICO
NFW MEXICO
NEW MEXICO
NEW MEXICO

APJ70NA
ARIZONA
ARIZONA

TEXAS

FLORIDA

MISSOURI

SOUTH CAROLINA
SOUTH CAROLINA

CALIFORNIA

ILLINOIS
ILLINOIS

INDIANA

MISSISSIPPI
MISSISSIPPI
START-UP
DATE

9/79

12/75
7/77
4/80

6/80
9/75
6/80
6/80

s/es

11/88

0/82

4/78
8/78
6/79
1/82

8/79
1/80
0/87

g/ao

6/83

6/81

7/77
5/80

1/82

5/79
0/84

5/79

8/78
5/79
STATUS

2

1
1
2

«
1
4
6

6

6

S

1
1
3
3

2
2
6

2

6

2

1
3

3

2
6

2

1
2
REG
CLASS

B

K<
B
B

B
B
S
B

0

R

A

S
B
B
B

a
B
B

A

A

A

A
A

D

A
A

A

A
A
   1,  OPERATIONAL  UNITS            4.   PLANNED  - LETTER  OF    INTENT SIGNED
   ?.  UNITS  UNDER  CONSTRUCTION     1.   PLANNED  - RESUESTIN6/IVALUATIN6 BIDS
   J.  PLANNED - CONTRACT AUARPEO   6.   PMNNED  - CONSIDERING ONLY F60 SYSTEMS
                                   7.   PLANNED  - CONSIDERING F60 SYSTEMS; ALSO ALTERNATIVE METHODS

   A.  BOILIR CONSTRUCTED SUBJECT  TO FEMRAL NSPS
   i.  BOILER SUBJECT TO  STATE  STANDARD  THAT IS MORE STPIN6INT THAN THE FEDERAL NSPS
   C*  BOILER SUBJECT TO  STATE  STANDARD  THAT IS EQUAL TO OR LESS STRINSENT THAN NSPS
   P.  OTHIR
   E.  RfeUMTORV CLASS  UNKNOWN

-------
                                          EPA UTILITY FGD SURVEY:  DECEMBER  1978  -  JANUARY  1979

                                          SECTION 1
                                 SUMPARY LIST OF FGD SYSTEMS
COMPANY NAME/
UNIT NAKE
SOUTHWESTERN ELECTRIC POWER
HENRY W. PERKEY
SPRIN6FIELO ClTY UTILITIES
SOUTHWEST
SPRINGFIELD WATER, LIGHT s PUR
DALLMAN
ST. JOE ZINC
6.F. VEATON
TAMPA ELECTRIC
616 BEND
TENNESSEE VALLEY AUTHORITY
CUMBERLAND
JOHNSOMVILLE
PARADISE
PARADISE
SHAWNEE
SHAVNEE
WIDOWS CREEK
WIDOWS CREEK
TEXAS MUNICIPAL POWER AGENCY
GIBBONS CREEK
TEXAS POVER i LIGHT
SANDOW
TWIN OAKS
TWIN OAKS
TEXAS UTILITIES
FOREST GROVE
MARTIN LAKE
MARTIN LAKE
MARTIN LAKE
MARTIN LAKE
MILL CREEK
MILL CREEK
MONTICELLO
UTAH POWER 8 LIGHT
EMERY
EMERY
HUNTINSTON
UNIT NO. UNIT LOCATION

1

1

3

1

4


HALLSVILLE

SPRINGFIELD

SPRINGFIELD

MONACA

TAMPA


TFXAS

MISSOURI

ILLINOIS

PENNSYLVANIA

FLORIDA

CUMBERLAND C 1 TYTE NNESSEE
1-10
1
Z
10A
10B
7
8

1

6
1
2

1
1
2
3
4
1
2
3

1
I
1
NEW JOHNSONVILLTFNNESSEE
PARADISE
PARADISE
PADUCAH
PADUCAH
BRIDGEPORT
BRIDGEPORT

CARLOS

ROCKDALE



ATHENS
TATUM
TATUM
TATUM
TATUM
HENDERSON
HENDERSON
MT. PLEASANT

CASTLE DALE
CASTLE DALE
PRICE
KENTUCKY
KENTUCKY
KFNTUCKY
KENTUCKY
At APAMA
ALABAMA

TEXAS

TFXAS
TEXAS
TEXAS

TEXAS
TEXAS
TEXAS
TEXAS
TEXAS
TFXAS
TEXAS
TEXAS

UTAH
UTAH
UTAH
START-UP
DATE

2/84

4/77

8/80

4/79

0/85

7/82
0/82
0/82
4/82
4/72
4/72
ID/SO
5/77

1/82

7/BO
8/83
9/84

0/81
4/77
5/78
2/79
0/85
0/85
0/86
5/78

4/79
6/80
5/78
STATUS

3

1

2

2

6

6
5
3
3
1
1
2
1

3

2
6
6

5
1
1
2
3
«
6
1

2
2
1
RE6
CLASS

A

A

A

B

A

C
c
C
c
c
c
c
c

A

A
A
A

A
A
A
A
A
D
0
A

A
A
A
WISCONSIN POWER I LIGHT
   COLUMBIA
        PORTAGE
                      WISCONSIN
                                        1/80
1.  OPERATIONAL UNITS
?.  UNIT! UNDiR CONSTRUCTION
3.  PLANNED - CONTRACT AWARDfO
«.  PUNNID  - LETTIR  OF     iNTINT SI6NIR
S.  PUNNED  • REeUESTXNe/iVALUAtlNG BIDS
6.  PLANNED  - CONSIDiRJNG  ONLY  FSD SYSTEMS
7.  PLANNiD  - CONSIDERING  F6P 5YSTIMS; ALSO ALTERNATIVE METHODS
4.  BOILER CONSTRUCTED SUBJECT TO FEDERAL NSPS
S.  BOILER SUWICT TO STA1I STANDARD THAT IS MORI ITRINSiNT  THAN THl  FlftlRAL NSPS
1.  BOILIR SUWICT TO STATI STANDARD 1HAT IS E6UAL TO OR  (.HI  STRIN6INT THAN NSPS

D.  OTHER
ft  RESULATOIY CLASS UNKNOWN

-------
FP» UTILITY  FGD 5URVEY:  DECEMBER 19?f - JANUARY 1979
                                              SECTION  2
                                        STATUS OF f6D  SYSTEMS
UNIT  IDENTIFICATION
                                                                   ABSTRACT
•LABAMA ELECTRIC  COOP
TOMBIGBEf
2
NEW        255.0  MH (GROSS)
           179.0  "W (ESC)
COAL
  1.15  XS   BITUMINOUS
LIMESTONE
PEA80DY PROCESS  SYSTEMS
F.NFRGY CONSUMPTION: ****X
STATUS 1      STARTUP  9/72
            REFER  TO  SECTION 3 OF THIS REPORT  FOR ADDITIONAL  INFORMATION.
            PFABGDY  ENGINEERING WAS AWARDED A  CONTRACT  FOR  THE  INSTALLATION OF A
            LIMESTONE FGD SYSTEM ON THIS UNIT. A HIGH-EFFICIENCY  ESP INSTALLED
            UPSTREAM  OF THF F6D SYSTEM PROVIDES PRIMARY  PARTICULATE CONTROL. THE FGD
            SYSTCC? CCNTAINS TWO SCRUBBING TRAINS, TREATING  APPROXIMATELY 70* OF THE
            FLUE  GAS  FOR REKOVAL OF SOZ. STACK GAS  REHEAT  Is  NOT  REQUIRED. THE UNIT
            IS  CtRREi'TLY IN THE SH AK EDQWN-D EBUGGIN6  PHASE  OF  OPERATIONS.
 ALABAMA  ELECTRIC COOP
 TOMBI6BEE
 7
 NEW        ?55.Q WW (GROSS)
           179.0 KW (ESC )
 COAL
  1.15  IS  BITUMINOUS
 LIMESTONE
 PEA600Y  PROCESS SYSTEMS
 FNFRGY CONSUMPTION: *****
 STATUS 2     STARTUP  6/79
            REFER TO SECTION 3 OF THIS RtPORT  FOR  ADDITIONAL INFORMATION.
            PEADODY tNGlNEERING WAS AWARDED A  CONTRACT  FOR  THE  INSTALLATION OF A
            LIMESTONl  FGD SYSTEM ON THIS UNIT.  A HIGH-EFFICIENCY ESP INSTALLED
            UPSTREAM OF THE FGD SYSTEM PROVIDES PRIMARY  PARTICULATE CONTROL. THE FGD
            SYSTEM CCNTAINS TWO SCRUBBING TRAINS,  TREATING  APPROXIMATELY 7o« OF THE
            FLUE GAS FOR REMOVAL OF S02. STACK  GAS  REHEAT  IS NOT REQUIRED. THE UNIT
            IS CUKREfTLY IN THE SHAKEDOWN-DEBUGGING PHASE  OF OPERATIONS.
 ALLEGHENY POWER SYSTEM
 MITCHELL
 RETROFIT
 COAL
 ***** xs
300-0 MU
300.0 MH
(GROSS )
(fSC)
ALLEGHENY POWER SYSTEM WILL INSTALL  FLUE GAS  DESULFURIZATlQN EQUIPMENT
ON UNIT :< AT THE MITCHELL PCfcER STATION.   THE  UTILITY IS CURRENTLY
IN THE PROCESS OF EVALUATING VARIOUS  FGD TECHNOLOGIES.   THE FGD IN-
STALLATUN IS SCHEDULED TO BEGIN OPERATIONS  IN  AUGUST 1982.
 ENER6Y CONSUMPTION: *****
 STATUS 6     STARTUP  8/K2
 ALLEGHENY POWER SYSTEM
 PLEASANTS
 1
 NEW       625.0 MW (GROSS)
           519.0 My (ESC)
 COAL
  4.50 XS  BITUMINOUS
 I 1ME
 PABCOCK 8 WIICOX
 ENERGY CONSUMPTION: *****
 STATUS 2.     STARTUP  3/79
            THE THREE PRINCIPAL OPERATING UTILITY  COMPANIES  OF  THE ALLEGHENY POWER
            SYSTEM ARE INSTALLING AN EMISSION  CONTROL  SYSTEM FOR THIS NEW COAL-FIRED
            UNIT WHICH INCLUDES A HI6H-EFFICIENCY  ESP  UPSTREAM  OF FOUR THAT TOWERS
            FOR THE CONTROL OF PARTICULARS  AND  SULFUR  DIOXIDE. DESIGN REMOVAL
            EFFICIENCIES FOR THIS EKJSS1CN CONTROL  SYSTEM  ARE 90 AND 99.5 PERCENT,
            RESPECTIVELY. THE 9RAVQ CO.  IS SUPPLYING THIOSQRBIC LINE. THE CONSULTING
            ENGINEERING FIRM IS UNITED ENGINEERS AND CONSTRUCTORS. CURRENTLY,
            ERECTION OF THE SCRUBBING EQUIPMENT  IS  IN  PROGRESS.
 ALLEGHENY POWER SYSTEM
 PLEASANTS
 ?
 NEW       625.0 MW (GROSS)
           519.0 NW (fSC>
 COAL
  4.50 XS  BITUMINOUS
 LIME
 BABCOCK I UILCOX
 FNERGY CONSUMPTION: *****
 STATUS 2     STARTUP  3/PO
            THE THREE PRINCIPAL OPfcRATiNG UTILITY  COMPANIES OF THE ALLEGHENY POKER
            SYSTtK f(f.f. INSTALLING AN EMISSION  CONTROL  SYSTEM FOR THIS NEW COAL-FIRED
            UNIT WHICH INCLUDES A HIGH-EFFICIENCY  ESP  UPSTREAM OF FOUR TRAY TOWERS
            FOR THE CONTROL OF PARTICULATES  AND  SULFUR  DIOXIDE. DESIGN REMOVAL
            EFFICIENCIES FOR THIS EMISSION  CONTROL SYSTEM ARE 90 AND 99.5 PERCENT,
            RESPECTIVELY. THE D^AVO CO.  IS  SUPPLYING THIOSORBIC LIME. THE CONSULTING
            ENGINEERING FIRM IS UNITEO ENGINEERS AND CONSTRUCTORS.
            FOUNDATION WORK ON THE SCRUBBER  PLANT  IS IN PROGRESS.
 ARIZONA ELECTRIC POWER COOP
 APACHE
 Z
 NEW       245.0 MW (GROSS)
           180.0 MW (ESC)
 COAL
   .70 XS  BITUMINOUS
 LIMESTONE
 RESEARCH COTTRELL
 ENERGY CONSUMPTION: *****
 STATUS 1     STARTUP  8/78
            REFER TO SECTION 3 OF THIS  REPORT  FOR  ADDITIONAL INFORMATION- THE  FGD
            SYSTtK FCR THIS NEW 200  MW  UNIT  WAS  SUPPLIED BY RESEARCH COTTRELL. THE
            DESIGN INCLUDES A 22 ACRE  SLUDGE POND  AND A 6t ACRE ASH POND, BOTH OF
            WHICH ARE UNL1NED AND TEN  FEET  DEEP. A REHEAT SYSTEM IS NOT  INCLUDED. THE
            LINERS UTFD IN THE STACK AND  THE DUCTS THAT LEAD TO THE STACK ARE  A NEW
            COLE BRAMI CXL2000 WHICH HAS  A  VERY  HIGH HgAT RESISTANCE. THIS  UNIT BURNS
            EITUMNOIS COAL WITH ASH CONTENTS  OF . 7t AND 10X RESPECTIVELY.
            INITIAL  OPERATION OF THIS  UNIT  BEGAN IN AUGUST, 1978.

-------
                                              EPA  UTILITY  FGG SURVEY:  DECEMBER  1978  - JANUARY  1979
                                              SECTION  z
                                        STATUS  or  FGD  SYSTEMS
UNIT 16ENTI.fl CATION
                                                                  ABSTRACT
ARIZONA ELECTRIC POWtR  COOP
APACHE
3
NEW       24J.O MW  (GROSS)
          no.o KW  (rsc)
COAL
  .70 XS  BITUMINOUS
LIMESTONE
RESEARCH COTTRELL
ENERGY  CONSUMPTION: *****
STATUS  2      STARTUP   4/79
CONSTRUCUON Or UN IT J IS NO* ESSENTIALLY COMPLETE. STRUCTURE
fRECTION or THE SCRUBPER-ABSORBER TOWERS IS COMPLETE. EACH SCRUBBER CAN
HANDLE 41.0,000 ACFM AT ?70F AND RECIRCULATE 20,000 6PM OF SLURRY.
THERE ART CURRENTLY TUO PONDS WITH A TOTAL OF 2Q-
VRS CAPACITY FOR DISPOSAL OF UNF1XATED SLUD6E. TWO ADDITIONAL PONDS
ARE FLANktD PROVIDING AN ADDITIONAL 20 YRS OF DISPOSAL CAPABILITY. THERE
WILL BE K> REHEAT. BECAUSE Or THE HUGH COST OF THE UNIT 2 STACK LINER,
UNIT 3 WILL USE A CE1LCOTE LINING INSTEAD OF THE CXL2000 USED IN UNIT  2.
ARIZONA  PUBLIC  SERVICE
CHOLLA
1
RETROFIT   119.0 MW  (6RO&S)
           11V.0 MW  (ESC)
COAL
   .50 XS   SUB&ITUMINOUS
LIMESTONE
RESEARCH  COTTRELL
ENERGY  CONSUMPTION:  4.£*
STATUS  1      STARTUP 10/73
REFER TO SECTION 3 OF THIS REPORT FOR ADDITIONAL INFORMATION
THIS LIMtSTONt SCRUBBING SYSTEM WAS PLACED IN SERVICE IN OCTOBER  1973.
THIS SCRIEBER PLANT CONSISTS OF TWO PARALLEL SCRUBBING TRAINS.
PARTHULATE CONTROL IS PROVIDED BY TUO FLOODED DISC SCRUBBERS.  S02
CONTROL  is PROVIDED ev ONE PACKED (HUNTERS PACKING) TOWER (A-SIDE).
FLUE GAS CLEANING WASTES ARF DISCHARGED TO AN EXISTING FLY ASH  POND.
NO WATER IS RECYCLED PACK FROM THE DISPOSAL PONo- IN-LlNE STEAM
REHEATER: RAISE THE GAS TEMPERATURE 40 F.
 ARIZONA PUPL1C SERVICE
 CHOLLA
 I
 NEW       350.0 MW (GROSS)
           150.0 MW crso
 COAL
   .50 XS  SUB BITUMINOUS
 LIMESTONE
 RESEARCH COTTRELL
 ENERGY CONSUMPTION: ****x
 STATUS 1     STARTUP  */76
REFER TO SECTION 3 OF THIS REPORT FOR ADDITIONAL INFORMATION.
THE CONTACT FOR THIS WET LIMESTONE SCRUBBING SYSTEM WAS AWARDED  BY  THE
UTILITY  10 RESEARCH-COTTRELL. THE DESIGN INCLUDES MECHANICAL COLLECTORS
FOR PRIMARY PAHT1CULATE REMOVAL. THE FGD SYSTEM CONSISTS OF  FOUR  PARALLEL
FLOODED  CISC AND PACKED TOWER ABSORBER TRAINS. THREE ARE REQUIRED FOR
FULL LOAl, CAPACITY. INITIAL OPERATIONS B^AN IN APRIL 1978.  COMPLIANCE
TESTING  fcAS COMPLETED DURING THE SECOND WEEK OF AUGUST 1978. THE  UNIT  IS
CURRENTLY UNDERGOING SHAKEDOWN AND DEBUGGING OPERATIONS.
 ARIZONA PUFLK SERVICE
 CHOLLA
 4
 NEW       750.0 MW (GROSS)
           126.0 MW (ESC>
 COAL
   .50 XS
 LIMESTONE
 RESEARCH COTTRELL
 ENERGY CONSUMPTION: ****X
 STATUS 2     STARTUP  6/*0
UNIT NO. 4 IS CURRENTLY UNDER CONSTRUCTION. APS HAS AWARDED  THE  FGO
CONTRACT TO  RESEARCH COTTRELL. THE STATE REGULATORY AGENCY HAS  NOT  Y£T
DECIDED  1HE  EMISSION PECULATIONS WHICH WILL APPLY TO THE  PLANT.  THE  C-E
BOILER WILL  FIRE THE SAME CO«L AS CHOLLA N0.1, WITH SULFUR CONTENT  OF
0.44-1.0 PERCENT* THE A-E FIRM IS E6ASCO. THE FGD SYSTEM  IS  A DOUBLE LOOP
LIMESTONt  ABSORPTION PROCESS AND REVENUES OF THE CONTRACT TO R-C ARE
REPORTED TO  6E  SS MM. FOR CONTROL OF PARTICULAR, AN ESP  WILL HANDLE
100X OF  1HE  FLUE GAS.
 ARIZONA PUBLIC SERVICE
 FOUR CORNERS
 1
 RETROFIT  175.0 MW (6ROSS)
           175.0 MW (ESC>
 COAL
   .75 XS
 LIME/ALKALINE FLYASH
 CHEMICO
 ENERGY CONSUMPTION: *****
 STATUS I     STARTUP  0/79
 APS  IS UF6RADING THg OPERATIONAL PARTICULATE SCRUBBERS AT THE FOUR
 CORNERS  1,2, AND 3  FOR ADDITIONAL S02 REMOVAL. CURRENTLY, EACH UNIT HAS 2
 CHEMICO  VSNTUR1 SCRUBBER MODULES FOR PARTICULATE CONTROL. ROUGHLY 3CX OF
 THE  FLUE CAS S02 CONTENT IS REMOVED AT THI PRESENT TIME IN THE VENTURIS
 WITH  THE H16H  AKALINE  FLYASH. NEW MEXICO APC OFFICIALS INDICATED THAT
 THE  b FOIR  CORNERS  UNITS WILL BE REQUIRED TO REMOVE AT LEAST 67.5X OF THE
 STATION  502 (AIL 5 UNITS CONSIDERED TOGETHER). ADDITIONAL ALKALINITY WILL
 BE  IMPARTED TO THE  SCRUBBING SOLUTION BY ADD1N6 LIME.
 ARIZONA PUPLIC SERVICE
 FOUR CORNERS
 2
 RETROFIT  175.0 MW (GROSS)
           175,0 MW (ESC)
 COAL
   .75 XS
 LIME/ALKALINE FLYASH
 CHEMICO
 ENERGY CONSUMPTION! •***»
 STATUS 2     STARTUP  0/79
 APS  IS  UFGRADING THE OPERATIONAL PARTICULATE SCRUBBERS AT THE FOUR
 CORNERS  1,2. AND 3  FOR ADDITIONAL  S02 REMOVAL. CURRENTLY, E*CH UNIT HAS 2
 CHEMICO  tF.NTURI  SCRUBBER MODULES FOR PARTICULATE CONTROL. ROUGHLY 3CX OF
 THE  FLUE  GAS S02 CONTENT IS  REMOVED AT THE PRESENT TIME IN THE VENTURIS
 WITH THE  HIGH  ALKALINE FLYASK. NEW MEXICO APC OFFICIALS INDICATED THAT
 THE  5  FOIR  CORNERS  UNITS WILL BE REBUIREO TO REMOVE AT LEAST 67.SX OF THE
 STATION  SO2(ALL  5 UNITS CONSIDERED TOGETHER). ADDITIONAL ALKALINITY WILL
 BE  IMPARTED TO  THE  SCRUBBING SOLUTION BY ADDING LIME.

-------
EPA UTILITY F6D SURVEY: DECEMBtR 197t - JANUARY 1979
                                              SECTION  2
                                        STATUS OF FGD  SYSTEMS
UNIT  IDENTIFICATION
                                  ABSTRACT
ARIZONA PUBLIC  SERVICE
FOUR  CORKERS
?
RETROFIT   229.0  MW  (GROSS)
           ?2«.0  Mt.  (ESC)
COAL
   .75  XS
LIME/ALKALINF  FLYASH
CHF.MICO
ENERGY CONSUMPTION: *****
STATUS 2      STARTUP   0/7«
APS IS UICRADING THE OPERATIONAL PARTICULATF SCRUBBERS AT THE FOUR
CORNERS 1,2, AND 3 FOR ADDITIONAL $02 REMOVAL. CURRENTLYt EACH UNIT HAS 2
CHtCKC VENTUR1 SCRUBBER MODULES FOR PARTICULUTE CONTROL. ROUGHLY 3CX OF
THE FLUE 6AS S02 CONTENT IS REMOVED AT THE PRESENT TIME IN THE VENTURIS
VlTH THE HIGH AKAL1NE FLYASH. NEW MEXICO APC OFFICIALS INDICATES THAT
THE 5 FCIP CORNERS UNITS WILL 6E REflUlRED TO REMOVE AT LEAST 67.SX OF THE
STATION J02ULL 5 UNITS CONSIDERED TOGETHER), ADDITIONAL ALKALINITY WILL
BE IhFARKD TO THE SCRUBBING SOLUTION BY ADDING L1MF..
 ARIZONA  PUP L1C  SERVICE
 FOUR CORNERS
 4
 RETROFIT  755. o MW  (SROSS)
           755.0 MW  (ESC>
 COAL
   .75  XS
THE UTILITY IS CURRENTLY EVALUATING THE DATA AND INFORMATION ACCUMULATED
DUR1N6 Tft HORIZONTAL PROTOTYPE SCRUBBING PROGRAM IN ORDER TO ASCERTAIN
VARIOUS FOSSIBLF. SmmifS TO CONTROL THF EMISSIONS FROM THIS COAL FIRED
755-Mb UMT. ADS WILL BE REOUIRED TO REDUCE THI CURRENT LEVEL OF $02
EMISSIONS FROM THE FNTIRE PLANT BY INCREASING THE REMOVAL EFFICIENCY
TO AT LF.m 67.SX. A CONTRACT HAS tiCEfj AWARDED TO UNITED ENGINEERS FOR
THE IKGUMRING AND CONSTRUCTION OF AN F6D SYSTEM.
 UNITED ENGINEERS
 ENERGY CONSUMPTION: »***X
 STATUS 3     STARTUP  0/F2
 ARIZONA PUBLIC SERVICE
 FOUR CORNERS
 5
 RETROFIT  755.0 MW (GROSS)
           755.0 MW (ESC)
 COAL
   .75 XS
 LIME
 UNITED ENGlNEfcRS
 ENERGY CONSUMPTION: «***x
 STATUS 3     STARTUP  0/82
THE UTILITY IS CURRENTLY EVALUATING THfe DATA AND INFORMATION ACCUMULATED
DURING THF HORIZONTAL PROTOTYPE SCRUBBING PROGRAM IN ORDER TO ASCERTAIN
VARIOUS  IOSS1BLE STRATEGICS TO CONTROL THF EMISSIONS FROM THIS COAL FIRED
7SS-KH UMT. APS WILL BE RIOOlftED TO REDUCE THi CURRENT LEVU OF SO?
EMISSION:: FROM THE ENTIRE PLANT BY INCREASING THE REMOVAL EFFICIENCY
TO AT LEfST 67.SX. A CONTRACT HAS Bt AWARDED TO UNITED ENGINEERS FOR
THE CKCI OfER1NG AND CONSTRUCTION OF AN FGD SYSTEM.
 ASSOCIATED ELECTRIC COOP
 THOMAS HILL
 j
 NEW       720.0 MW (GROSS)
           £70.0 MU (ESC)
 COAL
  *.EO XS
 LIMESTONE
 PULLMAN ITELLOGG
 ENERGY CONSUMPTION: «*«•»
 STATUS 3     STARTUP  1/C.2
ASSOCIATED ELECTRIC COOP AWARDED A CONTRACT TO PULLMAN KEL LOSS FOR THE
ENGINEERING^ PROCUREMENT AND CONSTRUCTION OF AN FGD SYSTEM ON THE UTILI-
TY'S THOPAS HILL UNIT NO. 3 POWER PLANT. $02 REMOVAL FGUIPMENT UILL OPER-
ATE IN CONJUNCTION WITH A HIGH EFFICIENCY ESP. THE SYSTEM, SCHEDULED FOR
START-UP IN 1982, WILL UTILIZE MAGNESIUM-PROMOTED LIMESTONE AS A REAGENT
IN THE FtUR MODULE WEIR FGD SYSTEM. REHEAT WILL PROBABLY NOT BE INCLUDED.
THE STACK WILL BE BRICK LINfO. THE DRY FIXATED SLUDGE WILL RE
HAULED TC AN ACTIVE STRIP MIME. CONSTRUCTION OF THE BOILER HAS PEGUN.
 BASIN ELECTRIC POWFR COOP
 ANTELOPE VALLEY
 1
 NEW       440.0 MW (GROSS)
           440.0 MW (ESC)
 COAL
   .68 XS  LIGNITE
 LIME (DRY COLLECTION)
 JOY MF6* CO. WESTERN PRECIPITA
 ENERGY CONSUMPTION: ****x
 STATUS 3     STARTUP 11/31
 THE UTILHY HAS SELECTED A LIME SCRUBBING PROCESS FOR THEIR PLANNED
 FGD SVSTtM. THE UNIT WILL FIRE LIGNITE COAL WITH A SULFUR CONTENT
 OF O.ft  PERCENT AND AN ASH CONTENT OF B.O PERCENT (6600 BTU/LB). THE
 WATFR LOCP WILL BE OPEN WITH MAKE-UP COMING FROM COOLING TOWER PLOWDOWN,
 THE SLID IE WILL BE DISPOSED IN A MINE LANDFILL. A CONTRACT HAS BEEN
 AWARDED  10 WESTERN PRECIPITATION DlViSON. JQY MFG. C0> FOR A DRV FGD
 SYSTEM.  1HE SPRAY DRYER HAS BEEN SUBCONTRACTED TO NlRO ATOMITER.
 BASIN ELECTRIC POWER COOP
 ANTELOPE VALLEY
 ^
           440.0 MU (GROSS)
           440.0 ffW (ESC)
 COAL
   .68 XS  LIGNITE
 PROCESS NOT SELECTED
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION: *****
 STATUS 6     STARTUP 11/?3
 THE  UTILITY  IS  TENTATIVELY  INVESTIGATING VARIOUS FGD  PROCESSES  FOR  THIS
 SECOND  LIGNITE-FIRED UNIT SCHEDULED AT THE  NEW  STATION LOCATED  IN MERCER
 COUNTY,  KAR BEULAH, NORTH  DAKOTA. THIS NEW FACILITY  WILL BE KNOWN  AS
 THE  ANTELOPE VALLEY STATION  AND WILL BE RE8UIRED TO COMPLY WITH  STATE
 AIR  EMISSIONS  STANDARDS  VIA  THE BEST AVAILABLE  TECHNOLOGY. START-UP IS
 NOW  SCHEDULED  FOR NOVEMBER  1963.

-------
                                              EPA UTIim F6D SURVEY: DECEMBER 1978 - JANUARY 1979
                                              SECTION 2
                                        STATUS OF FGD SYSTEMS
UNIT IDENTIFICATION
                                                                  ABSTRACT
BASIN ELECTRIC  POWER  COOP
LARA*IE RIVER
1
NEW       600.0 MW  (GROSS)
          600.0 MW  (ESC)
COAL
   .80 XS
LIMESTONE
RESEARCH COTTRELL
ENERGY  CONSUMPTION: *****
STATUS  2      STARTUP  4/?0
RESEARCH-COTTRELL IS CURRENTLY F AftRl;CA TIN* THE DUAL-LOOP LIMESTONE WET
SCRUBBERS. ON-SITE CONSTRUCTION COMMENCED IN JANUARY 1978. SLUDGE WILL BE
DEUATERE6 TO 83X SOLIDS BEFORE LANDFILL. THE SCRUBBERS WILL BE I»ADE OF
STAIMLESS STEEL AND WILL HANBLE 2.3 «W ACFM AT g86 F. L/6 RATIO WILL BE
60. fifcW frAS 6EEN AWARDED A CONTRACT FOR TWO ESP'S. THE DESIGN DOES NOT
INCLUDE STACK CAS RFHEAT. COOHN6 TOWER SLOWDOWN WILL BE USFD FOR MAKE-UP
WATER IN THIS CLOSED LOOP SYSTEM. CONSTRUCTION IS NOW 20X COMPLETE.
BASIN  ELECTRIC POWFR COOP
LARAM1E  RIVER
2
NED        600.0 WW (CROSS)
           600.0 MW (ESc>
COAL
   .60  XS
LIMESTONE
RESEARCH COTTRELL
ENERGY CONSUMPTION: *****
STATUS 2     STARTUP 10/80
RESEAFCH-COTTRELL IS CURRENTLY  FABRICATING THE DUAL-LOOP LIMESTONE WET
SCRUBBERS. ON-SITE CONSTRUCTION  COMMENCED IN JANUARY 1978. SLUD6E WILL BE
DEWATEREC TO 83* SOLIDS BEFORE,  LANDFILL. THE SCRUBBERS WILL BE MADE OF
STAINLESS STEEL AND WILL HANDLE  2.3 MM ACFM AT 386 F. L/6 RATIO WILL BE
60. ItV  MS BEEN AWARDED A CONTRACT FOR TWO ESP'S. THE DESISN DOES NOT
INCLUDE  STACK 6AS RFHE*T. cOCLjNC TOWER SLOWDOWN WILL BE US1D FOR MAKE-UP
WATER IN THIS CLOSED LOOP SYSTEM. CONSTRUCTION IS NOW 20X COMPLETE.
 BASIN  ELECTRIC POWER COOP
 LASAMIE RIVER
 5
 NEW       600.0 MW (GROSS)
           600.0 MU (FSC)
 COAL
   .80  XS
 LIME (DRY COLLECTION)
 BABCOCK K VILCOX
 INIR6Y CONSUMPTION: ***«X
 STATUS 3     STARTUP  t/?2
LARAMIE  RIVER STATION WILL  FIRE  SUBBITUMjNOUS COAL WITH THE FOLLOWING
CHARACTERISTICS: g100 BTU/L8, 0.8  PERCENT SULFUR AND 7.0 PERCENT ASH A
CONTRACT FOR A  DRY TYPE  FGD  SYSTEM HAS BIFN AWARDED TO BABCOCK f WILCOX.
 BIG RIVERS ELECTRIC
 6RIEN
 1
 NEK       242.0 HU (6ROSS)
           242.0 MU (esc)
 COAL
  3.75 XS  BITUMINOUS
 LI Me
 AMERICAN AIR FILTER
 ENfRGY CONSUMPTION: ****X
 STATUS 2     STARTUP 12/79
THI EMISSION CONTROL SYSTiM  FOR THIS N|H COAL-FIRED UNIT IS BEING
SUPPLIED FY AMERICAN AIR  FILTER.  THE SYSTEM WILL CONSIST OF A COLD-SIDE
ESP AND  WO SPRAY  TOWEKS  CONTROLLING PARTICULATE AND S02 TO 99.6 PERCENT
AND $0 PiRCENT, RESPECTIVELY. THf §&W iOILER WILL FIRE HIGH SULFUR (3.5
TO «.S PiT/CENT) WESTERN KENTUCKY  COAL,  CONSTRUCTION IS NOW 66X COMPLETE
ON THE BCILER  AND  SOX  COMPLETE ON THE FGD  SYSTEM.  THf DESIGN INCLUDES AN
INDIRECT HOT AIR REHEAT SYSTEM. IUCS WILL  CONSTRUCT A SLUDGE DISPOSAL
SYSTiP TC  SERVICE  BOTH 6RIEN 1 AMP  2.
 PIS RIVERS ELECTRIC
 6REEN
 2
 NEW       242.0 MW (GROSS)
           242.0 MW (ESC>
 COAL
  3.75 XS  BITUMINOUS
 LIME
 AMERICAN AIR FILTER
 ENERGY CONSUMPTION: ****X
 STATUS 2     STARTUP 12/80
THE (MISSION CONTROL  SYSTEM  FOR  THIS NEN COAL-FIRED  UNIT IS BEIN6
SUPPLIED BY AMERICAN  AIR  FILTER.  THE  SYSTEM WILL  CONSIST OF A COLD SIDE
ESP AND  1WO SPRAY  TOWERS  CONTROLLING PARTTCULATE AND  S02 TO 99.6 PERCENT
AND (0 PERCENT,  RESPECTIVELY.  THE  ggW  BOILER WILL  FIRE HI6H SULFUR  (3.5
4.S PERCENT) WESTERN  KENTUCKY  COAL. THE  FED SYSTEM WILL  INCLUDE AN
INDIRECT HOT AIR REHEAT  SYSTEM.  IUCS WILL  CONSTRUCT  A  SLUDGE DISPOSAL
SYSTEM Td  SERVICE  BOTH GREEN 1 AND  2.  THE  BOILER IS  CURRENTLY 81 COMPLETE
AND CONSIRUCTION HAS  JUST BEGUN  ON  THE  FGD  SYSTEM.
 CENTRAL ILLINOIS LIGHT
 DUCK CREEK
 1
 NEW       416.0 MU (GROSS)
           416.0 MU (E$C>
 COAL
  3.30 XS  BITUMINOUS
 LIMESTONE
 RILEV STOKER/ENVIRONEERING
 ENERGY CONSUMPTION: ****«
 STATUS 1     STARTUP  7/76
 REFER TO  SECTION  3  OF  THIS  REPORT  FOR  ADDITIONAL  INFORMATION.  RILEY
 STOKER  W»S  THE  SUPPLIER  OF  THE  FOUR  VENTUR1-ABSORBER  MODULES AT  THIS
 UNIT. SCNUBBER  TANKS AND PUMPS  ARE NEOPRENE  LINED.  A  HIGH  EFFICIENCY ESP
 IS UPSTREAM  OF  THE  FOUR  VENTLR1-ABSORBER  SCRUBBER MODULES  FOR  PARTICULATE
 CONTROL-  THE CONCRETE  STACK IS  LINED WITH CEILCOTE  FLAKELINE 151. NO RE-
 HEAT SYS1EM  IS  INCLUDED. TH? FIRST LIMESTONE SLURRY SCRUBBER MODULE WAS
 PLACED  It, SERVICE  ON SEPTEMBER  9,1976, AND OPERATED INTERMITTENTLY UNTIL
 APRIL 1,  1977.  ALL  FOUR  MODULES BECOME OPERATIONAL  ON JULY 24, 1978.

-------
EPA UTILITY FGD SURVEY:  DECEMBER f>1t - JANUARY 1979
                                              SECTION  2
                                        liTATUS OF Fee  SYSTEMS
UNIT  IDENTIFICATION
                                                                  ABSTRACT
CENTRAL  ILLINOIS  LIGHT
DUCK  CREFK
2
NEW        416.0  »w (GROSS)
           (16.0  MW 
COAL
  3.20  XS  BITUMINOUS
LIMESTONE
VENDOR NOT SELECTED
ENERGY CONSUMPTION: ****X
STATUS 5     STARTUP  1/F4
                               THE UTILITY HAS  NOT  YET  SELECTED A SYSTEM SUPPLIER. THE UTILITY  WILL
                               USE ESP'!  FOR  PARTICULAR CONTROL AND EITHgR LIMESTONE OR  DOUBLE ALKALI
                               FOR SC2  OFiSORPTION.  THE  UTILITY IS NOW IN THE PROCESS OF EVALUATING
                               BIDS AND A  STUDY IS  UNDERWAY TO DETERMINE THE SLUDGE DISPOSAL  STRATEGY
                               THAT WILL  BE EMPLOYED.
 CENTRAL  ILLINOIS PUBLIC SERV
 NEWTON
 1
 NEW       617.Q MW (GROSS)
           617.0 WW (ESC)
 COAL
  4.00  XS  BITUMINOUS
 DUAL ALKALI
 BUF.LL/ENVIRCTECH
 FNERSr  CONSUMPTION: *****
 STATUS  2     STARTUP 11/79
                               A  CONTRACT  HAS  BEEN  AWARDED BY c»PSO TO BUELL/ENVIRoTFCH  FOR  THE
                               INSTALLATION  OF  AN  EMISSION CONTROL SYSTEM ON UNIT  1.  THE KEY COM-
                               PONENTS  CF  THE  EMISSION CONTROL SYSTEM INCLUDE:  A HIGH-EFFICIENCY ESP;
                               FOUR  PRFCOOLERS, FOUR  POLYSPHERE ABSORBERS, THREE THICKENERS, TWO EX-
                               PERIMENT*!  REHFAT SYSTEMS, AND THREE HORIZONTAL  EXTRACTION  FILTERS FOR
                               SLUDtE  DCATERING.  MORE THAN 5U PERCENT OF THE CONSTRUCTION  WORK
                               AT THE  PLANT  HAS BEEN  COMPLETED. THE F6D SYSTEM  WILL HAVE CEILCOTE-
                               LINEC ABSORBER  MODULES.
 CENTRAL MAINE POWER
 SEARS ISLAND
 1
 NEW       600.0 MW (GROSS)
           6CD.O MW (ESC>
 COAL
 ***** XS
 LIME OR LIMESTONE
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION: ****X
 STATUS 6     STARTUP 11/«7
                                BECAUSE  (F  THE  DISCOVERY OF A GEOLOGICAL FAuLT ON  SEARS  ISLAND,  THE
                                UTILITY  HAS CANCELLED PLANS FOR A 11SO-MN NUCLEAR  POWER  PLANT.  A 60C-MW
                                COAL  FIRtD  UNIT IS  NOW BEING PLANNED IN ITS PLACE. COMMERCIAL OPERATION
                                IS  PROJECTED FOR NOVEMBER 1986. COMPLIANCE WITH $02  NSPS  WILL BE
                                ACHIEVED  BY INSTALLING AN FED SYSTEM. LIME AND LIMESTONE  SCRUBBING
                                PROCESSED ARE EEING GIVfN PPiMARY CONSIDERATION. CURRENTLY,  CMPCO HAS
                                FILED AN  APPLICATION WITH THE STATE PUBLIC UTILITIES  COMMISSION.  A DE-
                                LAY IN RECEIVING A  PERMIT FROM THE MAINE PUBLIC UTILITIES COMMISSION
                                HAS RESULTED IN A REVISED START-UP DATE OF NOVEMBER  19B7.
 CINCINNATI GAS & ELECTRIC
 EAST BEND
 ?
 NEW       650.0 MM (GROSS)
           650.0 MW (ESC)
 COAL
  5.00 XS
 LIME
 BABCOCK K WILCOX
 FNEftGY CONSUMPTION: *****
 STATUS 2     STARTUP 10/P.1
                                A  CONTRACT HAS BEEN CONDITIONALLY AWARDED TO BABCQCK  AND  WILCOX FOR A
                                COMMERCIAL LIME SCRUBBING SYSTEM. THE COAL SOURCE  IS  EXPECTED TO BE *
                                WESTERN KENTUCKY COAL WITH A HIGH SULFUR CONTENT.  THE  THREE  LIME SLURRY
                                FED  MODULES WILL BE PRECEDED BY AN ESP FOR PARTICULATE  CONTROL. A
                                CONTRACT HAS BEEN CONDITIONALLY AWARDED TO IUCS  FOR  THE SLUDGE  FIXATION.
                                THE  A-t FIRM iS SARGENT AND LUNDV. UNIT FOUNDATION HAS  BEGUN AND
                                FGD  SYSTEM CONSTRUCTION WILL BEGIN IN EARLY 1979.
 COLORADO UTE
 CRAIG
 1
 NEW
              ELECTRIC ASSN.
          450.0 FW  (GROSS)
          450.0 MW  (ESC)
COAL
  .45 XS  SUBBITUNINOUS
LIMESTONE
PEABODY PROCESS SYSTEMS
ENERGY CONSUMPTION:  ***«X
STATUS 2      STARTUP   3/79
PFABODY PROCESS SYSTEMS HAS BEEN AWARDED A  CONTRACT  TO DESIGN AND
SUPPLY A LIMESTONE SLURRY SPRAY TOWER  ABSORBER  SYSTEM FOR S02 REMOVAL
FROM LOW-SULFUR COAL-FIRED BOILER  FLUE  GAS  FROM UNITS 1 AND 2.
PARTICULATE CONTROL WILL BE PROVIDED BY HOT-SIDE ESP'S UPSTREAM OF THE
ABSORBER SYSTEM. SLUDGE UILL BE STABILIZED  AND  HAULED TO A MINEFILL
THERE kllL BE A STE«M cOIL TYPE STACK  GAS  REHEATER INCLUDED.  RF6UIRED
PARTICUL«TE AND S02 REMOVAL EFFICIENCIES ARE  99.8 A*D 85 PERCENT
RESPECTIVELY.  FGD CONSTRUCTION IS  NOW  80%  COMPLETE.
 COLORADO UTE ELECTRIC ASSN.
 CRAIG
 J
 NEW       450.0 MW (GROSS)
           450.0 MU (ESC)
 COAL
   .45 XS  SUBBITUMINOUS
 LIMESTONE
 PEABODY PROCESS SYSTEMS
 ENERGY CONSUMPTION: ****X
 STATUS 2     STARTUP  3/79
                                PEAECDY  PROCESS SYSTEMS HAS BEEN AWARDED A  CONTRACT TO DESIGN AND
                                SUPPLY A LIMESTONE SPRAY TOWER ABSORBER SYSTEM  FOR  SO? REMOVAL
                                FROM LOU-SULFUR COAL-FIRED BOILER  FLUE GAS  FROM UNITS 1 AND 2.
                                PARTICULATE CONTROL WILL BE PROVIDED BY HOT-SIDE ESP'S UPSTREAM OF THE
                                ABSORBER SYSTEM. SLUDGE WILL BE  STABILIZED  AND  HAULED TO A RINEFILL.
                                THERE WILL BE A STEAM COIL TYPE  STACK  GAS  REHEAT£R  INCLUDED. RE8UIRED
                                PARTICULATE AND S02 REMOVAL EFFICIENCIES ARE  99.6 AND 85 PERCENT
                                RESPECTIVELY.  FGD CONSTRUCTION  IS  NOW BOX  COMPLETE.
                                                  10

-------
                                               fPA UTILITY FSO SURVEY: DECFHBER  1978  -  JANUARK  1979
                                               SECTjON 2
                                         STATUS  OF FGD SYSTEMS
OMIT 10ENTIFICAT10N
                                                                   ABSTRACT
COLUMBUS *  SOUTHERN OHIO ELEC.
CONESVILLE
5
NEW       411 .0 MW (GROSS)
          411.0 MW (ESC)
COAL
 4.67  XS  BITUMINOUS
LIME
AIR CORRECTION DIVISION, UOP
ENERGY CONSUMPTION:  3.9*
STATUS 1      STARTUP  1/77
                                 REFER  TO  SECTION 3 Of THIS REPORT  FOR ADDITIONAL INFORMATION.  THE
                                 BOILER AM) ESP WERE COMPLETED AND  PLACED IN  SERVICE  IN  SEPTEMBER 1976.
                                 THE  B-SltE MODULE BECAME AVAILABLE FOR SERVICE  IN  JANUARY  1977.
                                 COMMERCIAL OPERATIONS MERE ACHIEVED ON FEBRUARY 13,  1977.  THE  EMISSION
                                 CONTROL SYSTEM FOR THIS UNIT CONSISTS OF A COLD-SIDE  ESP FOLLOWED BY
                                 TWO  LIME  TCA MODULES SUPPLIED BY uOP. DRAVO  IS  SUPPLING  THE  THIOSORB1C
                                 LIME  REAGENT. IUCS IS SUPPLYING A  POZ-O-TgC  SLUDGE STABILIZATION FAtUITy
COLUMBUS K SOUTHERN OHIO  ELEC.
CONESVILLE
6
NEW        411.0 Py (GROSS)
           411.0 MW (ESC)
COAL
  4.67  XS  BITUMINOUS
I 1ME
AI&  CORRECTION DIVISION,  UOF
ENERGY CONSUMPTION:   3.95:
STATUS 1     STARTUP   6/78
                                 REFEF  TO SECTION 3 OF THIS REPORT FOR ADDITIONAL INFORMATION.  CRSOE
                                 SI6UID L(NG TERM CONTRACTS WITH DRAVO FOR THE  PURCHACE  OF  THIOSORBIC LIME
                                 AND  HTH IUCS FOR A SLUDGE FIXATION SYSTEM.  CONSTRUCTION COMMENCED  IN
                                 1977 AND WAS COMPLETED IN JANUARY 1978. SIMILAR TO UNIT 5,  THIS  MINE
                                 MOUTH  pLWT BURNS COAL WITH  17% ASH AND 4.5  TO 4.9X  SULFUR  CONTENTS. THE
                                 DESIGN IKLUOES A* ESP UPSTREAM OF THE FGD  SYSTEM  FOR PARTICIPATE
                                 CONTROL. THE F60 SYSTEM INCLUDES TWO UWE TCA  MODULES FOR  THE  REMOVAL OF
                                 S02.
 COLUMBUS 8 SOUTHERN OHIO  El£C. THIS UM1 WILL BURN HIGH SULFUR OHIO COAL  (APPROXIMATELY  2.5  PERCENT
 PCS TON
 5
 NEW       375.0 MM  (GROSS)
           375.0 MW  (ESC)
 COAL
  2.50 XS
 PROCESS NOT SELECTED
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION:  *****
 STATUS 6      STARTUP   0/83
                                 SULFUR CONTENT). THE DESIGN CF THE EMISSION CONTROL  STRATEGY HAS  NOT
                                 YET BEEN FINALIZED. THE PROCESS WILL EITHER BE LIME, LIMESTONE, OR
                                 DOUBLE ALKALI.
 COLUMBUS &
 POSTON
 e
 NEW
            SOUTHERN  OHIO ELEC.
                                 THIS UM'I WILL BURN HIGH SULFUR  COAL (APPROXIMATELY  2.5  PERCENT  SULFUR
                                 CONTENT). THE DESIGN OF THE  EMISSION CONTROL STRATEGY  FOR  THIS  UNIT
                                 HAS NOT  ITT BEfN FINALIZED.
           375.0 MW  (GROSS)
           375.0 NW  (ESC)
 COAL
  2.50 IS
 PROCESS NOT SELECTED
 VENDOR NOT SELECTED
 fNERGY CONSUMPTIONS  *****
 STATUS 6      STARTUP   0/85
 COMMONWEALTH  EDISON
 POWfcRTOM
 51
 RETROFIT  450.0 MW  (GROSS)
           425.0 MW  
 COAL
  3.60 XS
 LIMESTONE
 Klf CORRECTION  DIVISION, UO?
 PNE»GV CONSUMPTION;  ****%
 STATUS 2      STARTUP  7/79
                                 TH'E AIR CORRECTION DIVISION  OF UOP  MAS AWARDED  THE  CONTRACT  FOR A WET
                                 LIMESTONE SYSTEM THAT WILL P£ BACKFITTtb ON  TO  sOUEfi  NO. 51, ONE QF TWO
                                 I6ENUCAI BOILERS SUPPLING STEAM TO AN 850-HK  TURBINE-SENEdATOR. THE
                                 SLUDGE WILL BE STABILIZED AND HAULED TO A  LANDFILL. REHEAT WILL BE
                                 PROVIDED HY A STEAK COIL WHICH WILL HEAT THE AMBIENT AIR  THAT IS PUMPED
                                 INTO THE SCRUsaiR OUTLET EEfORt THE FLUE GAS ENTERS THE  STACK. THE S02
                                 EMISSION STANDARD IS  1.S LB. S02/MM 6TO.   CONSTRUCTION jS
                                 ABOUT C.Oi COMPLETE.
 COOPERATIVE  POWER  ASSOCIATION
 COAL CREEK
 1
 NEW       545.0  MU  (GROSS)
           327.0  MW  (ESC)
 COAL
   .63 XS  LIGNITE
 LIME
 COMBUSTION  ENGINEERING
 ENERGY CONSUMPTION: *****
 STATUS 2      STARTUP  5/79
                                 THIS UNIT IS UNDER THF  COMBINED  OWNERSHIP  OF  COOP  POWER AND  UNITED POWER.
                                 A CONTRACT HAS BEEN AWARDED  TO COMBUSTION  ENGINEERING FOR THE INSTALLA-
                                 TION OF  LIME FGD SYSTEMS ON  UNITS  1 AND  £  AT  THIS  STATION. THE F60 SYSTEM
                                 FOR EACH BOILER WILL CONSIST Of  FOUR  SPRAY  TOWER ABSORBER MODULES FOR S02
                                 REMOVAL. CLECTRCSTATIC  PRE CI PlTATORS  WILL  BE  INSTALLED UPSTREAM OF EACH
                                 ABSORBER TRAIN. CONSTRUCTION BEGAN  EARLY IN AUGUST 1977. THE UNIT IS NOW
                                 85-90% CCMPLETE. BAD WINTER  WEATHER SLOWED  CONSTRUCTION SLIGHTLY.
                                                   11

-------
EPA UTILITY F6B SUPVFY:  DECEMBER 197f  -  JANUARY 1979
                                                SECTION  2
                                          fTATUS Of FGD  SYSTEMS
UNIT  IDENTIFICATION                                                 ABSTRACT

COOPERATIVE POWER  ASSOCIATION
COAL  CREEK
2
NEW        5*5.0 fy  (CROSS)
           JZ7.0 *y  (ESc>
COAL
   .63  XS  LIGMTF
LIME
COMBUSTION EKblNEERlNE
ENERGY CONSUMPTION:  ****!£
STATUS 2      STARTUP 10/t'O
THIS UM1  IS UNDER  THE COMBlfFD  OWNERSHIP OF  COOP POWER AND  UN 1 TED POW ER.
A CONTRACT  HAS  BEEN AWARDED  TO  COMBUST ION ENGINE£R1*6 FOR  T"  ""*"?"
TION OF  LINE F6D SYSTFMS ON  IN1TS 1 AND 2 AT  THIS STATION.  THE  F6D STSTEM
FOR tACH EOILER WILL CONSIST OF  FOUR SPRAY TOWER  ABSORBER MOCULES FOR  SO2
REMOVAL. ELECTROSTATIC PRECI PITATORS WILL BE  INST*LL »«""""  OF EACH
ABSORBER TRAIN. CONSTRUCTION BEGAN EARLY IN AUGUST  1 "7 *N »  ™E  UNIT IS
NOW 45X  COMPLETE, THERE HAVE BEEN MINOR DELAYS  BUT  START-UP  IS  STILL
SCHEDULE!.  FOR  NOVEMBER 1979.
 DELMARVA POWtR  &  LIGHT
 DELAWARE CITY
 1 -3
 RETROFIT  1«0.0 »y  (GROSS)
           180.0 MW  
 COKE
  7.50 XS  COKt
 WELLMAN LORD
 BftVV POWFRCAS
 ENERGY CONSUMPTION: ****S!
 STATUS 2      STARTUP  4/EG
DFLMAPVA'S  DELAWARE CITY PLANT  HAS  4 BOILFRS,  3  OF  WHICH HAVE  STEAM
CAPACITlfcS  Of  500K LBS/HR EACH.  THE BOILERS GENERATE  STEAM  AS  HELL AS
ELECTRICAL  POWER FOR GETTY  REFINING & MARKETING.  ?-8* S COKE WILL BE
BURNED  IK THE  BOILERS (INSTEAD  OF  THE LOW-S CRUDE OIL NOW BURNED) WHEN
THE CONTfrL S^STEK ROES INTO  OPERATION IN APRIL  1980. DELMARVA WILL USE
VENTUR1  SCRUBBERS FOR PARTICIPATE  REMOVAL AND  WELLMAN-LORD  F GO SYSTEMS AT
EACH BOItER GAS EXIT FOR SO?  CONTROL. DESIGN PARTICULATE AND SO? REMOVAL
EFFICIENCIES ARE 90 AND 85-9C PERCENT RESPECTIVELY.  CONSTRUCTION IS 3f?X
COMPLETE .
 fOOUfSNt LIGHT
 ELRAHA
 RETROFIT
       XS
            510.0  MW (GROSS)
            51C.O  My (ESC)
 «*••*
 LIME
 CHEMICO
 ENERGY CONSUfPTlONr  3.SX
 STATUS 1      STARTUP 10/75
REFER TO  SECTION 3 Of THIS  REPORT FOR ADDITIONAL  INFORMATION.
THE  F6D  JYSTEM ON THIS 4-BOILER  UNIT CONSISTS  OF  FIVE COMI«ON -HE *DER EO
SINGLE  S1A6E  VENTURT SCRUBBER-ABSORBERS DOWNSTREAM  FROM A MECHANICAL
COLLECTOf-ESP PARTICULATE REMOVAL SYSTEM. T«E  PLANT BURNS COAL  WITH A
HEATING  \ALVE OF 11,000 BTU/LB  AND SULFUR AND  ASH CONTENTS Of  1.8 TO 2.2X
AND  21X  ifSPECTIVELY. DEWATERFD  SLUDGE FROM THE  IUCS PLANT IS  HAULED TO
AN OfF-SJTE  LANDFILL. THE SYSTEM  INCLUDES A DIRECT  OIL-FIRED STACK GAS
REHEAT  SYSTEM. DESIGNED REMOVAL  EFFICIENCIES ARE  99% (PART)  AND  83%
(S02).
 DUaUFSNE LIGHT
 PHILLIPS
 1-6
 RETROFIT   tIC.0 My (GROSS)
            410.0 MW (ESC)
 COAL
  2.00 XS
 LIME
 CHEMICO
 ENERGY CONSUMPTION:  2.4'
 STATUS 1      STARTUP  7/73
REFER TO  SECTION 3 OF THIS  RtPORT FOR ADDITIONAL  INFORMATION.
THE  FED    AND  B3JUS02).
 EAST KENTUCKY POWER COOP
 SPURLOCK
 ?
 NEK        500.0 My (GROSS)
            500.0 HW (EsC)
 COAL
  3.SO XS
 LIME
 AOL/COMBUSTION E8UIP ASSOCIATE
 ENERGY CONSUMPTION: ****X
 STATUS 3      STARTUP  3/FO
A CONTRACT  HAS BEEN AyAROEO  TO  ADL/COMBUSTION  ECUIPMENT ASSOCIATES FOR
A HHf  SLURRY FGD SYSTEM ON  THE NEW 500-MW  UNIT SPURLOCK ?.  PARTICULATES
WILL  BE  CONTROLLED BY A 99.5i EFFICIENT ESP. COOLIN6 TOWER  BLOWDOWN WILL
BE USED  /S  THE MAKE-UP WATER  SOURCE FOR THE  FGD SYSTEM. THE  DESIGN S02
REMOVAL  tFFICIENCY IS 90Z.  THE  SYSTEM IS NOW IN THE DESIGN  PHASE.
 GENERAL PUBLIC  UTILITIES
 COHO
 1
 NEW       900.Q MW (GROSS)
           8CO.O My (ESC)
 COAL
  3.50 XS
 PROCESS NOT  SELECTED
 VENDOR NOT  SELECTED
 FHFR6Y CONSUMPTION: ****X
 STATUS 6      STARTUP  5/88
STARTUP  BATE WAS CHANGED  TO  5/88 FOR BOTH  BOILER A«D DESULFURIZATI ON
SYSTEM.  IIME AND LIMESTONE  SCRUBBING ARE THE  PRIMARY STRATEGIES BEING
CONSIDERFD  FOR COMPLIANCE WITH  NEW SOURCE  PERFORMANCE STANDARDS. NO
DECISION  HAS BEEN MAOF YET,  ALTHOUGH A SLURRY TYPE SYSTEM  IS NOT
CONTEMPLATED.
                                                    12

-------
                                               EPA  UTILITY F6D SURVEY:  DECEMBER 1978  -  JANUARY 1979
                                                SECTION  z
                                         JTATUS  OF  FCD  SYSTtMS
UNIT IDENTIFICATION
                                                                     ABSTRACT
GENERAL PUBLIC  UTILITIES
SEWARD
7
NEW        £00.0 PIU (GROSS)
           800.0 MW (ESC>
COAL
***** XS
PROCESS NOT SELECTED
VENDOR  NOT SELECTED
ENERGY  CONSUMPTION: *****
STATUS  6      STARTUP  5/85
STARTUP  BATE WAS  CHANCED TO 5/85  FOR  BOTH BOILER AND DESULFURIZATION
SYSTEM.  LIME AND  LIMESTONE SCRUBBING  ARE THE PRIMARY STRATEGIES BEING
CONSIDERED  FOR  COMPLIANCE WITH THE  NEW  SOURCE PERFORMANCE  STANDARDS.
NO DECISION HAS BEEN MADE YET, ALTHOUGH A SLURRY TYPE  WILL  NOT PE USED.
GULF  POWER                       REFER TO
SCHOLZ                          INTERNAT
1,2                              ON AUEliS
RETROFIT   23.0 MW  (GROSS)      BUBBLING
            23.0 «W  (ESC)        PROVIDES
COAL                             BY A DOU
  2.50 XS  BITUMINOUS            EXISTING
LIMESTONE (CHIVODA  121)         ALONG hi
CHIYODA INTERNATIONAL
ENERGY CONSUMPTION:  *****
STATUS 1     STARTUP   8/78
          SECTION 3 OF THIS REPORT  FOR  ADDITIONAL INFORMATION. CHIVQDA
         IONAL SUPPLIED THIS  23  MW  PROTOTYPE UNIT WHICH BEGAN  OPERATION
         1 30, 1978. THE CT-121  SYSTEM  INCLUDES A NEWLY DEVELOPED JET
          REACTOR WHICH FEATURES  A  LARGE GAS-LIQUID INTERFACIAL AREA AND
          PARTICULATE AS WELL AS  502  REMOVAL. MIST ELIMINATION is PROVIDED
         FIE  PASS VERTICAL CHEVRON.  GYPSUM IS PRODUCED AND  STACKED IN THE
          POND.  THE STACKING  CAPABILITIES OF THE GYPSUM ARE  BEING TESTED,
         1H  THE  GROUND WATER  NEAR THE STACK SITE TO CHECK FOR  LEACHING.
 HOOSIER ENERGY
 MEROM
 1
 NEW       490.0 MU  (GROSS)
           441.0 MU  (ESC)
 COAL
  3.50 XS
 LIMESTONE
 MITSUBISHI INTERNATIONAL
 ENERGY CONSUMPTION: ****X
 STATUS 2     STARTUP  4/81
HOOSIER  ENERGY  AWARDED A CONTRACT  TO  MITSUBISHI INTERNATIONAL CORP. FOR
TWO LIMESTONE  FGD SYSTEMS FDR HESOM  1 AND 2. THE NEW 490  MW  COAL-FIRED
UNITS ARE  PLANNED FOR LOCATION  IN  SULLIVAN, INDIANA. THE  FLUE GAS STREAMS
WILL BE  CLEANED OF  PARTICULATE  WITH  ESP'S (99.4X) AND OF  SULFUR DIOXIDE
WITH GRIP-TOWER ABSORRERS OCX). SLUDGE WILL BE STABILIZED  AND
STOCKPILED.   THE GROUND WAS  BROKEN FOR CONSTRUCTION  IN NOVEMBER 1977.
BOILER  S1RUCTURAL STEEL IS NOW  BEING  ERECTED AND FGD FOOTINGS ARE IN PLACE
 HOOSIER ENERGY
 MEROM
 ?
 NEW       490.0 MU  (GROSS)
           441.0 MW  (ESC)
 COAL
  3.50 XS
 LIMESTONE
 MITSUBISHI INTERNATIONAL
 ENERGY CONSUMPTION:  *****
 STATUS 2      STARTUP  1/J2
HOOSIER  ENERGY AWARDED A CONTRACT  TO MITSUBISHI INTERNATIONAL  CORP. FOR
TWO  LIMESTONE FGD SYSTEMS  FOR  HEROK 1 AND 2. THE NEU 490  MW  COAL-FIRED
UNITS  ARE  PLANNED FOR LOCATION  IN  SULLIVAN, INDIANA. THE  FLUE  GAS STREAMS
WILL BE  CLEANED OF PARTICULATE  WITH ESP'S (99.4Z) AND  OF  SULFUR DIOXIDE
WITH GRIC-TOUER ABSORBERS  (9o%>.  SLUDGE WILL BE STABILIZED  AND
STOCKPILED. THE GROUND WAS  BROKEN  FOR CONSTRUCTION IN  NOVEMBER 1977, BUT
DUE  TO TKt  BAD WINTER WEATHER,  CONSTRUCTION WAS DELAYED.  THE BOILER IS
ESSENTIALLY COMPLETE. STARTUP  IS  EXPECTED SHORTLY.
 HOUSTON LIGHTING  ft  POWER CO,
 U.A. PARISH
 8
 NEV       550.0 MU  (GROSS)
           512.0 MH  (fSC)
 COAL
   .60 XS
 LIMESTONE
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION: ****X
 STATUS 5      STARTUP 10/82
HLSP  WILL  BE INSTALLING AN  FGD  SYSTEM ON THE UTILITY'S  600  MW W. A.-
PARISH  g UNIT. PARTICUALTE  MATTER WILL BE CONTROLLED BY BAGHOUSE UP-
STREAM  OF  THE LIMESTONE SLURRY  FGD SYSTEM. THE FGD SYSTEM  WILL BE
DESIGfcEO TO REMOVE SO? WITH  AN  EFFICIENCY OF GREATER THAN  B3X. REHEAT
WILL  BE PROVIDED BY BY-PASSING  71 OF THE PARTICULATE CLEANED
GAS.  SLUDGE WILL BE DFWATERFD,  BLENDED WITH FLYASH AND  DISPOSED IN AN
ON  SITE LANDFILL. INITIAL STARTUP IS SCHEDULED FOR FALL,  1982.
 INDIANAPOLIS POWER  &  LIGHT
 PETERSBURG
 3
 NEW       532.0 MW  (GROSS)
           532.0 MW  (ESC)
 COAL
  3.25 XS  BITUMINOUS
 LIMESTONE
 AIR CORRECTION  DIVISION, UOf
 ENERGY CONSUMPTION:  2.4X
 STATUS 1     STARTUP  12/77
REFER  TO  SECTION 3 OF THIS  REPORT FOR ADDITIONAL INFORMATION. THE WET
LIMESTONE FGD SYSTEM INSTALLED  ON THIS UNIT WAS SUPPLIED  BY THE AIR
CORRECTIIN DIVISION OF UOP. UNIT  3 FIRES BITUMINOUS  COAL  HAVING A SULFUR
CONTENT  CF 1.5-4.5Z» AN ASH CONTENT OF 9-10X AND A 11,000 BTU/LB
VALUE. TkO ESPS PROVIDE PRIMARY PARTICULATE CONTROL  UPSTREAM OF A FOUR-
MODULE TCA FGD SYSTEM. STABILIZED SLUDGE IS DISPOSED  ON AN ON~SlTE POND.
THE  OESIEN INCLUDES AN INDIRECT STEAM TUBE REHEAT  SYSTEM. SHAKE DOWN
AND  DEBUGGING OPERATIONS ARE  STILL PROCEEDING.
                                                   13

-------
EPA UTILITY F&D SURVEY:  DECEMBER  197P  - JANUARY 1979
                                              SECTION 2
                                        STATUS OF FGD SYSTEMS
UNIT IDENTIFICATION                                               ABSTRACT

INDIANAPOLIS POWER t. LIGHT
PETERSBURG
4
NEW       53C-0 MU (CROSS)
          530.0 MW (ESC)
COAL
 3.50 XS  BITUMINOUS
LIMESTONE
RESEARCH COTTRELL
ENERGY  CONSUMPTION:  *****
STATUS  2     STARTUP  10/FJ

KANSAS  CITY  POWER  E  LIGHT
HAWTHORN
                                             POWER * LIGHT AWARDED A CONTRACT  TO  RESEARCH COTTRFLL
                                FOR A LIKE STONE FGD SYSTEM. S02 REMOVAL  EFFICIENCY WILL BE
                                APPROXIMATELY BO PERCENT. THIS NEW UNIT WILL  FIRE HIGH-SULFUR
                                BITUKINOU COAL WITH A HEATING VALUE OF 11,000 STU/LB AND ASH AND
                                SULFUR CONTENTS OF 10 PERCENT AND  3.5  PERCENT, RESPECTIVELY, SLUDGE  KILL
                                BE DtVAT.RED AND MlXEt) WITH  FLYASH TO  PRODUCE  A DRV STABILIZED PRODUCT.
                                EXCAVATICN, FOUNDATION WORK  AND SOME STEEL  WORK IS  NOW IN
                                PROGRESS ON THE UNIT.
RETROFIT   110.0  f!W (CROSS)
           110.0  MM (ESC)
COAL
   .60  IS   BITUMINOUS
LIME
COMBUSTION ENGINEERING
ENERGY CONSUMPTION:  1 . 6X
STATUS 1      STARTUP 11/72
                               REFER TO SECTION 3  OF  THIS  REPORT FOR  ADDITIONAL INFORMATION.
                               THE  SCRUfPER-ASSORBFR  SYSTEM  ON  THIS UNIT WAS CONVERTED  FROM A  LIMESTONE
                               FURNACE  INJECTION  AND  TAIL-ENO  SYSTEM  TO A TAIL-END LIME SLURRY SYSTEM.
                               OPERATIC!*  IN  THE LIME  SCRUBBING  MODE COMMENCED ON JANUARY  1, 1977.  COM-
                               PLIAKCi  1EST  INDICATED  THE  DMT  MEETS  THE KANSAS CITY 0.1? LB/HM
                               BTU  PARTICULATE REG. F60  SYSTEM  DESIGN INCLUDES A FINNED-TUBE STEAH
                               REHE*T£R,  AN  ON-SITE UNLINED  SLUDGE DISPOSAL POND, AND A CHEVRON MIST
                               ELIMINATOR  SYSTEM.  THE  2  FGD  MODULES CAN BE BY-PASSED IN EMERGENCIES.
KANSAS CITY POWER 8 LIGHT
HAWTHORN
4
RETROFIT  110.0 MU (GROSS)
          110.0 MU (ESC)
COAL
  .60 XS  BITUMINOUS
LIME
COMBUSTjON ENGINEERING
ENERGY CONSUMPTION:  1.8X
STATUS 1     STARTUP   8/72
                                REFER TO SECTION 3 OF THIS REPORT  FOR  ADDITIONAL  INFORMATION.
                                THE SCRUDPER-ABSORBER SYSTE" ON  THIS UNIT  WAS  CONVERTED FROM A
                                FURNACE INJECTION AND TAIL-END SYSTEM  TO A  TAIL-END LIME SLURRY SYSTEM.
                                OPERATION IN THE LIME SCRUBBING  MODE COMMENCED  ON JANUARY 1, 1977- COM-
                                PLIANCE TEST INDICATED THE UNIT  MEETS  THE  KANSAS  CITY 0.17 LB/MM
                                BTU PARTICULATE REG. FGD SYSTEM  DESIGN  INCLUDES A FINNED-TUBE STEAM
                                REHEATER, AN ON-SITE UNLINED SLUDGE DISPOSAL POND,  AND A CHEVRON
                                ELIMINATE SYSTEM. THE 2 FGD MODULES CAN BE BY-PASSED IN EMERGENCIES.
 KANSAS CITY POWER  R LIGHT
 LA CV6NE
 1
 NEW
           874.0 MW (GROSS)
           874.0 MU (ESC)
 COAL
  5.39  XS  SUPBITUMINOUS
 LIMESTONE
 PABCOCK R  WILCOX
 ENERGY CONSUMPTION:  2.7X
 STATUS 1     STARTUP  2/73
                                REFER  TO  SECTION  3  OF  THIS  REPORT FOR ADDITIONAL INFORMATION.
                                THE  EMISSION  CONTROL  SYSTEM FOR  THIS NEW COAL-FIRED POWER-GENERATING  UNIT
                                CONSISTS  OF EIGHT SCRUBBER  MODULES  FOR FLY ASH AND 502 REMOVAL.  EACH
                                MODULE  ItvCLUDES A VENTURI  SCRUBBER  IN SERIES WITH A 2-STAGE  IMP IN CEMENT
                                PLATE  ABSORBER. THE SCRUBBER PLANT  is AN INTEGRAL PART OF THE  POWER-
                                6ENFRATIKG  COMPLEX, ALLOWING NO  FLUE 6AS PYPASS. INITIAL OPERATIONS
                                COMMEKCED IN  FEB. 1973.  COMMERCIAL  SERVICE HAS ATTAlNgfi 6V  JUNE  1973.
 KANSAS POWER K LIGHT
 JEFFREY
 1
 NEW        720.0 MU (GROSS)
           540.0 MU (£SC>
 COAL
   .32  XS
 LIMESTONE
 COMBUSTION ENGINEERING
 ENERGY CONSUMPTION: *****
 STATUS 1     STARTUP  8/78
                                REFER  TO  SECTION  3  Op  THIS  REPORT FOR ADDITIONAL INFORMATION.  COMBUSTION
                                ENGINEERING  SUPPLIED THE  LIMESTONE EMISSION CONTROL SYSTEM  FOR  THIS  NEW
                                COAL  FIRID UNIT.  THE UNIT CONSISTS OF A COLD-SIDE ESP AND SPRAY TOWERS
                                FOR THE  CONTROL OF  SOJ  AND  PARTICULATE EMISSIONS. 30X Of THE FLUE  6AS IS
                                BYPASSED  FOR REHEAT. NOx  EMISSIONS ARE CONTROLLED BY AN  AIR  OVtRFIRE
                                SYSTEM AT THE TAN6ENTIALLY  HRED PULVERIZED BUNKERS. THE CLFANEB 6ASES
                                ARE VENTfD TO A 600 FT  STACK. SLUD6E IS MIXED WITH BOTTOM ASH  AND
                                DISPOSED  OF  IN  THE  EXISTING ON-SITE BOTTOM ASH POND.
KANSAS  POWER k LI6HT
JEFFREY
2
MEW        700.0 MW (GROSS)
           490.0 MW (ESC)
COAL
   .30  XS
LIMESTONE
COMBUSTION ENGINEERING
ENERGY  CONSUMPTION: **«*X
STATUS  2      STARTUP  6/80
                                COMBUSTICN  ENGINEERING  IS  SUPPLYING THE EMISSION CONTROL  SYSTEM FOR THIS
                                NEW  COAL  FIRED  UNIT.  THE SYSTEM WILL CONSIST OF A  COLD-SIDE  ESP ANb SPRAY
                                TOWERS  FCR  THE  CONTROL  OF  PARTICIPATE AND 502 EMISSIONS.  30X OF THE FLUE
                                6AS  WILL  EE BYPASSED  FOR REHEAT. AN OVERFIRE AIR SYSTEM  AT  THE  TAN6ENT1AL
                                FIRED PULVERIZED  BURNERS WILL CONTROL NOX EMISSIONS.  THE  CLEANED GASES
                                WILL BE  VENTED  TO A 600 FT STACK. SLUD6E WILL BE MIXED WITH  BOTTOM ASH
                                AND  DISPOSED ON-SITE  IN THE BOTTOM ASH POND. THE SYSTEM  STEEL WORK IS UP
                                AND  CONSTRUCTION  IS APPROXIMATELY 40X COMPLETE.
                                                 14

-------
                                              EPA UTI11TY FCit  SURVEY!  6ECF.MBER  1978 - JANUARY 1979
                                              SECTION 2
                                        STATUS OF FGD SYSTEMS
UNIT IDENTIFICATION
                                                                   ABSTRACT
KANSAS POWER  B,  LIGHT
LAWRENCE
4
RETROFIT  125.0 MW  (GROSS)
          1JS.O MW  (FSc>
COAL
   .55 XS
LIMESTONE
COMBUSTION  ENGINFER1NG
ENERGY CONSUMPTION!  *«**«
STATUS 1      STARTUP  1/76
RF.FF.K TO SECTION 3 OF THIS  REPORT  FOR  ADDITIONAL INFORMATION.
THE NEH LIMESTONE FGD SYSTEM  COMMENCED OPERATIONS JN EARLY JANUARY 1977.
THE KEk SYSTEM REPLACED MARBLE-BED  TOWERS  WITH SPRAY TOWERS.  THERE HAVE
BEEN NO FORCED SCRUBBfR OUTAGES  REPORTED SINCE START-UP. CONTINUOUS S02
MONITORS HAVE RECORDED SO?  REMOVAL  EFFICIENCIES OF  BETTER THAN P5*.
THE UTILITY REPORTED PARTICIPATE REMOVAL IS SUCH THAT NO VISIBLE PLUME
EXITS THl STACK.  THE PLANT IS  FIRING  COAL RATED AT 10,000 BTU/LB WITH A
SULFUF1 CONTENT OF 0.5X
KANSAS  POWER  &  LIGHT
LAWRENCE
5
RETROFIT   4?0.0 DIM  (GROSS)
           420.0 MW  (ESC)
COAL
   .55 XS
LIMESTONE
COMBUSTION ENGINEERING
ENERGY  CONSUMPTION: *****
STATUS  1      STARTUP 11/71
REFER 10 SECTION 3 OF  THIS  REPORT  FOR  ADDITIONAL INFORMATION. THE
ORIGINAL LIMESTONE INJECTION  AND TAIL-END  SCRUBBING SYSTEM W«S SHUT
DOWN ON PARCH 20 SO THAT  THE  NEW ROD-SCRUBBER AND SPRAY TOWER ABSORBER
SYSTEM CHILD BE TIED INTO THE UNIT.  THE  NFW  SYSTEM, WHICH INCLUDES TWO
MODULES, EACH CAPABLE  OF  HANDLING  APPROXIMATELY SO PERCENT OF THE TOTAL
BOILER FIDE GAS FLOW,  CAME  ON LlNE  APRIL 1«. 1978. THE SYSTEM DESIGNER
AND SUPPLIER WAS COMBUSTION ENGINEERING. THE UNIT FIRES LOW SULFUR
WYOMING COAL WITH A HFAT  CONTENT OF  10,000 BTU/LB.
 KENTUCKY UTILITIES
 GREEN  RIVER
 1-3
 RETROFIT   64.0 MW (GROSS)
            64.0 MW (ESC)
 COAL
  4.00  XS  BITUMINOUS
 LIME
 AMERICAN AIR FILTER
 ENERGY CONSUMPTION:  3.u
 STATUS 1     STARTUP  9/7S
REFER TO SECTION 3  OF  THIS  REPORT  FOR  ADDITIONAL INFORMATION.
THE SCRIMPER PLANT  INSTALLED  AT  THIS  STATION CONSISTS OF ONE MODULE
DESIGNED TO REMOVE  PARTICULATE  (VARIABLE-THROAT VENTURI) AND SO? (MOBILE
-BED CONTACTOR) FROM COAL-FIRED  BOILER  FLUE  GAS. THE  SCRUBBER WAS
DESIGNED AND SUPPLIED  BY  AAF. SLUDGE  IS DISPOSED IN AN ON-SITE UNLINED
POND. THE COAL BURNED  HAS SULFUR AND  ASH CONTENTS OF  4.0 AND 11*
RESPECTIVELY AND A  MOISTURE  CONTENT OF  6-10  PERCENT.  INITIAL STARTUP
OCCURRED IN SEPTEMBER  1975.  COMMERCIAL  OPFRATION BEGAN IN JANUARY 1976.
 LAKELAND UTILITIES
 MCINTOSH
 1
 NEW       364.0 PW (GROSS)
           364.0 MU (ESC)
 COAL
  Z.56 XS  BITUMINOUS
 LIMESTONE
 BABCOCK g WILCOX
 ENERGY CONSUMPTION: ****X
 STATUS 3     STARTUP 10/K1
THE CITY OF  LAKELAND  DEPARTMENT  OF  ELECT RlC AND WATER UTILITIES AWARDED
A CONTRACT  TO  BSW  FOR  AN  EMISSION CONTROL SYSTEM ON THE UTILITY'S NEW
350-MW  PCWER GENERA6IN6 UNIT, MCINTOSH  3. THE UNIT WILL UTILIZE COLD
SIDE FSP'S  FOR  PARTICULATE  REMOVAL  AND  TWO LIMESTONE  SCRUBBER ABSORBER
MODULES. START-UP  IS  SCHEDULED FOR  OCTOBER 1981. THE  COAL WILL CONTAIN
ABOUT E.5*  SULFUR.  THE UNIT DESIGN  INCLUDES A REHEAT  AND AN IUCS SLUDGE
DISPOSAL SYSTEM.   SITE EXCAVATION HAS  BEGUN.
 LOUISVILLE GAS g ELECTRIC
 CANE RUN
 4
 RETROFIT  190.0 My (GROSS)
           190.0 BW (ESC>
 COAL
  3.75 XS
 LIKE
 AMERICAN AIR FILTER
 ENERGY CONSUMPTION:  1.6%
 STATUS 1     STARTUP  8/76
 REFER  TO  SECTION  3  OF  THIS  REPORT FOR  ADDITIONAL INFORMATION.
 THE  FCC  SYSTEM  RETROFITTED  ON THIS  BOILER  WAS DESIGNED AND SUPPLIED BY
 AMERICAN  AIR  FILTER  AND  WAS FIRST PLACED IN THE GAS PATH ON AUGUST 7,
 1976.  THE  SYSTEM  CONSISTS  OF TWO PARALLEL  MODULES WHICH INCLUDE MOBILE
 BED  CONTACTORS  AND  OPERATE  WITH  A CARBIDE  LIME ADDITIVE. FOLLOWING A
 NUMBER OF  MAJOR SYSTEM MODIFICATIONS (CHEVRON-TYPE MIST ELIMINATOR. OIL
 FIRED  RFIFAT, PLASITE  DUCT  LINER, HIGHER L/6), THE SYSTEM SUCCESSFULLY
 PASSED COMPLIANCE TESTING  (85X SO?  REMOVAL) ON AUGUST 3 AND 4, 1977.
 LOUISVILLE GAS & ELECTRIC
 CANE RUN
•5
 RETROFIT  ?00.0 KM (GROSS)
           2CO.O MU (ESC)
 COAL
  3.75 XS  BITUMINOUS
 LIME
 COMBUSTION ENGINEERING
 ENERGY CONSUMPTION:  1.5*
 STATUS 1     STARTUP 12/77
 REFER  TO  SECTION  3  OF  THIS  REPORT FOR ADDITIONAL INFORMATION.
 THE  FED  SYSTEM  FOR  THIS UNIT WAS DESIGNED AND SUPPLIED BY COMBUSTION
 ENGINEERING.  IT CONSISTS OF TWO SPRAY TOWER ABSORBERS FOR FULL-LOAD SO2
 REMOVAL  tUt UTILIZES CARBIDE LIME AS THE ABSORBING REAGENT. IN-LINE STEAM
 REHEAT,  A COMMON  REACTION TANK, AND A THICKENER FOR SOLIDS DEWATERING
 ARE  INCLIOED. AN  EXISTING UPSTREAM ESP PROVIDES PRIMARY PARTICIPATE
 CONTROL.  THE  FGD  SYSTEM BEGAN INITIAL OPERATION IN DEC. 1977 BUT A COAL
 STRIKE  FlffCED A PLANT  SHUTDOWN. THE SYSTEM WAS RE-STARTED HARCH 2«, 1978.
                                                  15

-------
FPA UTILITY  ffeD SURVEY:  DECEMBER 197F - JANUARY 1979
                                              SECTION 2
                                        CTATUS OF FSD SYSTEMS
UNIT  IDENTIFICATION
                                                                   ABSTRACT
LOUISVILLE  GAS  t  ELECTRIC
CANE  RUN
6
RETRpflT   278.0 My  (GROSS)
           27f.O MW  (ESC)
COAL
  3.75  XS
DUAL  ALKALI
AOL/COMBUSTION  EQUIP ASSOCIATE
FNFRGY CONSUMPTION: *****
STATUS Z      STARTUP  3/79
THE CONTACT FOR THIS FULL-SCALE  DEMONSTRATION flat SYSTEM HAS BFEN
AWARDED 1C A.D. LITTLE/COMBUSTION EflUlPMENT ASSOC. FOR THE INSTALLATION
OF A DOUILE ALKALI SYSTEM.  THE  FEDERAL  EPA  HILL SUBSIDIZE A MAXIMUM
$4.5 MM IOR OPERATION, RESEARCH  AND  DEVELOPMENT, AND REPORT WRITING  FOR
A ON£-YE«F PERIOD FOLLOWING  THE  FIRST  THREE MONTHS OF OPERATIONS  
 COAL
  3.75  XS
 LIME/LIMFSTONE
 COMElUSTION  ENGINEERING
 fNERGY CONSUMPTION: *****
 STATUS 2      STARTUP  */M
A COMPLIANCE SCHEDULE WAS SUBMITTED  TO  TH£  JEFFERSON COUNT* Alfc POLLUTION
CONTROL USTRICT WITH 4/81  ESTABLISHED  AS  THE STARTUP DATE FOR AN  F6D
SYSTEM. CPERATIN6 DATA AND  UFORMAT10N  FROM THE FULL-SCALE SCRUP0EK PLANT
NOW IN STRVKE ON THE NO. 4  UNIT  AT  CANE RUN WILL BE OBTAINED BEFORE THE
UTILITY FROCtEDS WITH ADDITIONAL  SYSTEM DESI6N WORK. * CONTRACT HAS
AWAR&fD 10 COMBUSTION ENGINSlRlNG FOR  A LI M E /I IM ESTOIHE F6D SYSTEM.
 LOUISVILLE IAS t ELECTRIC
 MIIL CREEK
 2
 RETROFIT  350.0 MW (GROSS)
           350.0 MW (FSC)
 COAL
  3.75  XS
 LIME/LIMESTONE
 COMBUSTION EN61NFEPING
 FNER&Y CONSUMPTION: *****
 STATUS 3     STARTUP  4/?2
A COMPLIANCE SCHEDULE WAS  SUBMITTED  TO  THE  JEFFERSON COUNTY AIR POLLUTION
CONTROL  CISTRICT WITH 4/82  ESTABLISHED  AS  THE STARTUP DATI FOR AN f6p
SYSTEM.  CPERAT1NG DATA  AND  IKFORMATION  FROM THE FULL-SCALE SCRUEBiR PLANT
NOW IN SERVICE ON THE NO.  4  UNIT  AT  CANF  RUN WILL BE OBTAINED BEFORE THE
UTILITY  M?OCEIDS WITH ADDITIONAL  SYSTEM DESIGN WORK. A CONTRACT WAS
AWAPDID  10 COMbUSTION ENGINEERING FOR  A LIWE'lIMESTONf F$B SYSTEM.
 LOUISVILLE GAS K ELECTRIC
 MILL CREEK
 J
 NEW       425.0 KM (GROSS)
           425.0 MW (ESC)
 COAL
  3.75  XS  BITUMINOUS
 LIME
 AMERICAN AIR FILTE"
 ENERGY CONSUMPTION: *****
 STATUS 1     STARTUP  8/7$
REFER TO SECTION 3 OF  THIS  REPORT  FOR  ADDITIONAL INFORMATION. THI SYSTEM
WAS DESICNED AND SUPPHID BY  AAF AND UTILIZES CARBIDi LIME
AS THE ABSORBENT.  FOUR  MOBILE-BEG  ABSORBERS TREAT THfc FLUE GAS RESULTING
FROM THE COMBUSTION  OF  HIGH-SULFUR  COAL.  THE SYSTEM OPERATES IN AN OPEN
WATER LOCF. THE SCRUBPW WASTE  is  STABILIZED WITH FLYASH AND LIME.
THE UNIT RECAME OPERATIONAL ON  AUGUST  13i 1978.
 LOUISVILLE GAS I ELECTRIC      EECAlSt
 MILL CREEK                     UNIT  STA
 t                               NEW 495-
 IV EW       495.0 MW (GROSS)     IS IN  PR
           495.0 MW (ESC)       TREATING
 COAL                           CLOSED.
  3.75  *S                       REHEAT W
 LIME                           PRIOR  TO
 AMERICAN AIR FILTER
 ENERGY CONSUMPTION: ****%
 STATUS Z     STARTUP  7/E1
         IOWEH DEMAND  HAS  NOT  COME Up AS RAPIDLY AS HAD BEEN EXPECTED,
         KT-UP HAS  BEEN  MOVED  PACK TO JULY 1961. CONSTRUCTION OF THIS
         I73.  THE FGD SYSTEM CONSISTS OF TWO  2-STA6F  MARBLE
BED ABSOKBERS WHICH ARE  DESIGNED TO USE CARBIDE LIME ADDITIVE  AS  THE
scRUtciNc  REAGENT.  PADDYS  RUN NO. 6 is A PEAK-LOAD UNIT THAT OPERATES
ONLY DURING  DEMAND  PERIODS. AN EXTENSIVE EPA SCRUBBER/SLUDGE EVALUATION
STUDY WAI  COMPLETED IN AUGUST 1977. THIS UNIT HILL BE  RETIRED  WHEN  MILL
CREEK 3  ITCOMES FULLY  OPERATIONAL.
                                                  16

-------
                                               EPA UTILITY  FGt  SURVEY: DECEMBER 1978  -  JANUARY 1979
                                               SECTION  2
                                         STATUS OF FGD  SYSTEMS
UNIT  IDENTIFICATION
                                                                    ABSTRACT
LOUISVILLE  6AS I ELECTRIC
TRIMBLE  COUNTY
1
NEW        575.0 «W  (GROSS)
           575.0 MW  (ESC)
COAL
 4.00  XS  BITUMINOUS
PROCESS  NOT SELECTED
VENDOR NOT SELECTED
ENERGY CONSUMPTION: *****
STATUS 6     STARTUP   7/84
L6&E WILL BE INSTALLING F6D SYSTEMS ON TWO OF THE  UTILITY'S TRIABLE
COUNTY UMTS. THE  575-MW UNITS WILL BURN COAL WITH AN AVERAGE 4* SULF(jR
CONTENT  (IF NO  COAL  WASH IS INCLUDED). PARTICULATE MATTER WILL BE
CONTROLLED BY ESP'S  AND SOZ KILL BE CONTROLLED  BY  WET SCRUBBING (90X
REMOVAL  EFFICIENCY). SLUDGE DISPOSAL STRATEGY IS AS  YET, UNDECIDED.
START-UP IS SCHEDULED FOR JULY 1984 A«D 1986  RESPECTIVELY.
LOUISVILLE CAS t ELECTRIC
TRIMBLE COUNTY
?
NEW       575.0 My  (GROSS)
           575.0 MW  (ESC)
COAL
  4.00 XS  BITUMINOUS
PROCESS NOT SELECTED
VENDOR NOT SELECTED
ENER6Y CONSUMPTION: *****
STATUS 6     STARTUP   0/84
LG&E W1LI BE  INSTALLING FED SYSTtMS ON TWO  OF  THE  UTILITY'S TRIABLE
COUNTY UMTS. THE  575-MW UNITS WILL BURN COAL  WITH AN AVERAGE 4X SUlfUR
CONTENT  (IF  NO  COAL WASH IS INCLUDED). PARTICULATE MATTER WILL BE
CONTROLLtD BY ESP'S AND SO2 WILL BE CONTROLLED  BY  WET SCRUBBING (9QX
REMOVAL  EFFICIENCY). SLUDGE DISPOSAL STRATEGY  IS AS YET* UNDECIDED.
START-UP IS  SCHEDULED FOR JULY 1984 A(gO 19B6 RESPECTIVELY-
 MIDDLE SOUTH UTILITIES
 ARKANSAS COAL
 5
 NEW       890.0 MW  (CROSS)
           890.0 MW  (ESC)
 COAL
   .50 ZS
 PROCESS NOT SELECTED
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION: *****
 STATUS 5     STARTUP  1/R6
A CONTRACT  HAS  BEEN AWARDED FOR BOILERS AMD  TURBINES  ON S*X NEW MIDDLE
SOUTH  UTILITIES UNITS.  THE UTILITY  IS CURRENTLY  RE«UESTING/EVALUATING
BIDS FOR  THE  FGD INSTALLATIONS ALTHOUGH THE  TYPE  OF  FGO SYSTEM HAS NOT
YET EEEN  DETERMINED.
 MIDDLE SOUTH  UTILITIES
 ARKANSAS  COAL
 6
 NEW       890.0  MW (GROSS)
           890.0  MW (ESC>
 COAL
    .50 ZS
 PROCESS NOT  SELECTED
 VENDOR NOT  SELECTED
 ENERGY CONSUMPTION: *****
 STATUS 5      STARTUP  1/88
 A  CONTRACT HAS  BEEN AWARDED  FOR BOILERS  AND  TURBINES  ON SIX NEW MIDDLE
 SOUTH  UTILITIES UNITS. THE UTILITY  IS  CURRENTLY REQUESTING/EVALUATIN6
 BIOS  FOR THE FGD INSTALLATIONS ALTHOUGH  THE  TYPE OF FGD SYSTEM HAS NOT
 YET BEEN DETERMINED.
 MIDDLE  SOUTH UTILITIES
 LOUISIANA  COAL
 1
 NEW        890.0 MW (GROSS)
            890.0 MU (ESC>
 COAL
    .50 XS
 PROCESS NOT  SELECTED
 VENDOR  NOT SELECTED
 ENERGY  CONSUMPTION: ****z
 STATUS  5      STARTUP  0/86
 A  CONTRACT HAS BEEN AWARDED  FOR  BOILERS  AND TURBINES ON SIX NEW MIDDLE
 SOUTH UTILITIES UNITS.  THE  UTILITY  IS  CURRENTLY REQUEST/EVALVAT1N&
 BIDS  FOR THE FGD INSTALLATIONS ALTHOUGH  THE TYPE OF FGO SYSTEM HAS NOT
 YET  BEEN DETERMINED.
 MIDDLE  SOUTH UTILITIES
 LOUISIANA  COAL
 2
 NEW        890.0 MW (GROSS)
            890.0 MU (ESC)
 COAL
    .50 XS
 PROCESS NOT  SELECTED
 VENDOR  NOT SELECTED
 ENERGY  CONSUMPTION: ****X
 STATUS  5      STARTUP  0/88
 A  CONTRACT HAS BEEN AWARDED  FOR  BOILERS AND TURBINES ON SIX NEu MIDDLE
 SOUTH UTILITIES UNITS. THE UTILITY  IS CURRENTLY REQUESTING/EVALUATING
 BIDS FOR THE FGD INSTALLATIONS  ALTHOUGH THE TYPE OF FGD SYSTEM HAS  NOT
 YET BEEN DETERMINED.
                                                   17

-------
F PA UTILITY FGD SURVEY:  DECEMBER 1"7t  -  JANUARY 1979
                                                SECTION  2
                                          bTATUS Of F6D  SYSTEMS
UNIT  IDENTIFICATION
                                                                      ABSTRACT
"IDDLE  SOUTH UTILITIES
MISSISSIPPI COAL
1
NEW        89C.O l»»  (GROSS)
           P90.0 MW  (fSc >
COAL
   .50 IS
PROCESS NOT StLECTC|>
VENDOR NOT  SELECTED
ENERGY CONSUMPTION: *****
STATUS 5     STARTUP  0/?5
A CONTRACT  HAS  BEEN AWARDED  FOR  BOILERS AND  TURBINES ON  SIX  NEU MIDDLE
SOUTH UTILITIES UNITS.  THE  UTILITY IS CURRENTLY RfOUESTIN6/EVALUATINS
tIDS FOR THE  F6D INSTALLATIONS  ALTHOU6H THE  TYPE OF FGD  SYSTEM  HAS  NOT
YET eerw BETERWINEO.
 MIDDLE SOUTH  UTILITIES
 MISSISSIPPI COAL
 7
 NEW       850.0 Mb  (GROSS)
           890.0 KW  (ESC)
 COAL
   .50 XS
 PROCESS NOT SELECTED
 VENDOR NOT  SELECTED
 ENERGY CONSUMPTION: *****
 STATUS 5      STARTUP  0/K7
A CONTRACT  HAS  BEEN AWARDED  FOR BOILERS AND  TURBINES ON  Si*  NEW MIDDLE
SOUTH UTILITIES UNITS.   THE  UTILITY IS CURRENTLY REQUESTING/EVALUATING
BIDS  fOR  THE FGD INSTALL ATI OIvS ALTHOUGH THE  TYPE OF FGD  SYSTEM HAS NOT
YbT fcEEN  DETERMINED.
 MINNESOTA POWER  &  LIGHT
 CLAY BOSWELL
 t
 NEW       5GQ.Q  MW (GROSS)
           475.0  MW (ESC)
 COAL
   .80 XS  SUBBITUMINOUS
 LIME/ALKALINE  FLYASH
 PEABOOY PROCESS  SYSTEMS
 ENERGY CONSUMPTION: *****
 STATUS 2      STARTUP  5/80
KINNfSOT/i  PRL HAS AWARDED  A  CONTRACT TO PEABODT PRoCESS  sVSTEMS FOR  A
LIltE/ALKlLINE FLYASH SCRUBBING SYSTEM. THE  CONFIGURATION  WILL BE VENTURI
SCRUbPER"  FOLLOWED BY  SPRAY  TOWERS. HOT SIDE  ESP'S WILL  BE  USED FOR
PARTICDL0TE CONTROL. STACK  GAS REHEAT WILL  BE ACCOMPLISHED  BY BYPASSING
Sr.  OF  FliF GAS AROUND  THE  SCRUBBER. THE UNIT  WILL FIRE S UBBI TOM INOUS
COLSTR1P COAL UlTH A SULFUR  CONTENT OF 0-S*«  AND AN ASH  CONTENT OF 9.OX
(HEATING VALUE-8300 BTU/LP). MAKE-UP WATER  SOURCE WILL BE THE RIVER  AND
THE  CLAY LINED POND.   CONSTRUCTION OF THE  FGD SYSTEM IS  ABOUT 9QX
COMPLETE .
 KINNKOTA POWER  COOPERATIVE
 HILTON  R.  YOUNG
 2
 N£W        477.0 MW (GROSS)
            4C5.0 MW (ESC)
 COAL
   .70 XS   LIGNITE
 LIME/ALKALINE  FLYASH
 ADL/COMBUSTlON  EQUIP ASSOCIATE
 ENERGY  CONSUMPTION:  1.9X
 STATUS  1      STARTUP  9/77
 REFER  TO SECTION 3 OF  THIS  REPORT FOR ADDITIONAL INFORMATION.
 THIS  LIME/ALKALINE FLYASH  SCRUBBING WAS  DESIGNED AND SUPPLIED BY
 ADL/CCMB ISTION EQUIPMENT ASSOCIATES. IT  CONSISTS OF A  COLD-SIDE ESP
 FOLLOWED BY TWO SPRAY  TOWERS. THE DESIGN  INCLUDES A WASH  TRAY AND A
 CHEVRCKl  P1ST ELIMINATOR. 15X FLUE «AS BYPASS PROVIBFS  STACK  6AS REHEAT.
 THE  UNIT FIRES A LOW-SULFUR &ORTH OOKOTA  LIGNITE WITH  AN  AVERAGE ASH
 CONTENT  CF 8 PERCENT,  SULFUR CONTENT OF  0.7  PERCENT, AND  H£A1 CONTENT OF
 6500  (IV/IB. THE FLYASH ALKALINITY IS USED  AS THE PRIMARY S02 REA6ENT.
 MONTANA POWER
 COLSTRIP
 1
 NEW       ?tC.O I'M (GROSS)
           36C.O MW (ESC)
 COAL
   .77 XS  SU6BITUMINOUS
 LIME
 ADI/COMBUSTION  E9U1P ASSOCIATE
 ENERGY CONSUMPTION:  J.JT
 STATUS 1      STARTUP  9/75
 REFER  TO SECTION 3  OF  THIS  REPORT  FOR  ADDITIONAL INFORMATION.
 THIS  rtC EflUlPPED UNIT WAS  DECLARED COMMERCIAL IN NOVEMBER  1975. THE
 SCROEBINt SYSTEM PROVIDES PARTICIPATE  AND  S02 CONTROL  WITH  THREE SCRUBBER
 MODULES. FACH MODULE CONSISTS OF A DOWNFLOW VENTURI  SCRUBBER CENTERED
 WITHIN Ah UPFLOW SPRAY TOWER ABSORBER.  EACH MODULE CAN TREAT 40% OF
 THE  TOTAL BOILER FLUE  GAJ AND THE  MODULES  CANNOT BE  BYPASSED. TtfE UN-
 STA6UI7£» SLUDGE IS DISPOSED IN AN ON-SITE LINED DISPOSAL  POND. IN-LINE
 STEAM  KE^EAT AND CLOSED WATER LOOP CAPABILITY ARE INCLUDED  IN THE SYSTEM.
 MONTANA POWER
 COLSTRIP
 2
 NEW       360.0  MM (GROSS)
           360.0  MW (ESC)
 COAL
   .77 XS  SUtBlTUMINOUS
 LIME
 ADL/COMBUSTlON  E8UIP ASSOCIATE
 ENERGY CONSUMPTION:  3.3X
 STATUS 1      STARTUP  5/76
 REFER  TO SECTION 3  OF  THIS  REPORT  FOR  ADDITIONAL INFORMATION.
 THIS  FGD EQUIPPED UNIT  WAS  DECLARED COMMERCIAL IN AUGUST 1976.  THE
 SCRUtBINS SYSTEM PROVIDES PARTICULATE  AND S02 CONTROL WITH THREE SCRUBBER
 MODULES. EACH MODULE CONSISTS OF A DOWNFLOW VENTURI  SCRUBBER CENTERED
 WITHIN Ah UPFLOW SPRAY  TOWER ABSORBER. EACH MODULE  CAN TREAT 40* OF
 THE  TOTAL BOILER FLUE  GAS AND THE  MODULES CANNOT BE  BYPASSED. THE  UN-
 STABHI7tl> SLUDGE IS DISPOSED IN AN ON-SITE LINED DISPOSAL POND. IN-LINE
 STEAM  REhEAT AND CLOSED WATER LOOP CAPABILITY ARE INCLUDED IN THE  SYSTEM.
                                                    18

-------
                                               EPA UTILITY  FKC SURVEYS OECEMBEff  1976  - JANUARY
                                               SECTION  2
                                         STATUS OF F6D  SYSTEMS
UNIT IDENTIFICATION
                                                                    ABSTRACT
MONTANA POWER
COLSTRIP
3
NEV 700
700
tOAL
.70 XS
LIME/ALKALINE



• 0
.0





ttu
MU





(6ROSS)
CESO


A CONTRACT FOR THE INSTALLATION OF TWO ADBITIOWAL LI ME /ALKALINE FLYASH
SCRU6BINI SYSTEMS HAS BEEN AWARDED TO A.D. LITTLE/CO«fi«JS Tl ON EQUIPMENT '
ASSOCIATES. THESE SYSTEMS WILL BE INSTALLED ON UNITS "5 AND 4 OF THE
COLS1R1P POWER STATION. COLSTRIP UNITS 1 AND 2 ARE BOTH EQUIPPED KITH
OPERATIONAL LIME/ALKALINE FLYASH SCRUBBING SYSTEMS FOR THE REMOVAL OF
PARTICIPATES AND SULfUR DlOXjDE.

FLYASH
ADI/COMBUSTION EQUIP  ASSOCIATE
ENERGY CONSUMPTION: ***«*
STATUS 3     STARTUP   7780
MONTANA POWER
COLSTRIP
«
NEW        roo.o MM  (GROSS)
           7CO.O MW  
COAL
   .70 XS
LIME/ALKALINE FLYASH
ADL/COM6USTION EQUIP  ASSOCIATE
ENERGY CONSUMPTION:  *****
STATUS 3      STARTUP   7/S1
A CONTRACT FOR  THE  INSTALLATION OF TWO ADDITIONAL  LIME/AIKAL1NE FLYASH
SCRUfcfJNf SYSTEMS  HAS  BEEN  AWARDED TO A.D. UTTLE/cOflfiUS TjON EfitllPMENT
ASSOC1ATIS. THESE  SYSTEMS WILL BE INSTALLED ON  UNITS  3  AND 4 OF THE
COLSTRIP POWER  STATION.  COLSTRIP UNITS 1 AND ?  ARE  BOTH EQUIPPED WITH
OPERATlonAL LIME/ALKALINE Ft YASH SCRUBBING SYSTEMS  FOR  THE REMOVAL OF
PARTICULmS AND SULFUR  DIOXIDE.
 NEVADA POWER
 HARRY ALLEN
 1
 NEW       500.0 MM  (GROSS)
           500.0 MW  (FSO
 COAL
 ***** Xs
 PROCESS NOT SELECTED
 VENDOR NOT  SELECTED
 ENERGY CONSUMPTION: ****X
 STATUS 6      STARTUP  6/F5
CONS1DE.R1K6  HOT  SIpE  ESP IN CONJUNCTION WIT" **>  f6D  SrSTEM. SPECIFICA-
TIONS HAVE NOT  YET  BEEN PREPARED.
 NEVADA POWER
 HARRY ALLEN
 Z
 NEW        500.0  MW (GROSS)
            500.0  MM (FSC)
 COAL
 ***** XS
 PROCESS NOT  SELECTED
 VENDOR NOT  SELECTED
 FNERGT CONSUMPTION: ****X
 STATUS 6      STARTUP  6/?<>
CONS1DER1N6  HOT  SIDE  ESP IN CONJUNCTION UlTH AN  F6D  SYSTEM.  SPECIFICA-
TIONS HAV- NOT  YET  BEEN PREPARED.
 NEVADA  POWER
 HARRY ALLEN
CONSIDERING  HOT  SIDE ESP IN CONJUNCTION WITH AN  FGD  SYSTEM.  SPECIFICA-
TIONS  HA« NOT  YET  BEEN PREPARED.
 NEW        5CO.O »W (GROSS)
            5CO.O MW (ESC)
 COAL
 *****  XS
 PROCESS NOT  SEtECTED
 VENDOR NOT SELECTED
 ENFR6Y CONSUMPTION: ****Z
 STATUS 6      STARTUP  6/P7
 NEVADA  POWER
 HARRY ALLEN
 4
 NEW        500.0 MU (CROSS)
            500.0 MW (ESC)
 COAL
 ***** XS
 PROCESS NOT SELECTED,
 VENDOR  NOT SELECTED
 ENFR6T  CONSUMPTIONS ****«
 STATUS  6      STARTUP  6/F8
CONSIDERING  HOT SIDE ESP IN CONJUNCTION UjTH  AN  FGD  SYSTEM. SPECIFICA-
TIONS  HAVE  NOT  YET BEEN PREPARED.
                                                   19

-------
EPA UTILITY FGD SURVEY: DECEMPfR  1«7f  -  JANUARY  1979
                                              SECTION  Z
                                        HATUS  OF  F6D  SYSTEMS
UNIT IDENTIFICATION
                                                                  ABSTRACT
NEVADA POWER
REID GARDNER
1
RETROFIT  125.0 MW  (GROSS)
          125.0 MW  (ESe)
COAL
   .50  XS
SODIUM CARBONATE
ADL'COMBUSTION  EQUIP  ASSOCIATE
ENERGY CONSUMPTION: *****
STATUS 1      STARTUP   4/74
REFER TO SECTION J OF THIS REPORT FOR ADDITIONAL INFORMATION.  THIS  SODIUM
CARBONATt-BASED (TRONA) SCRU6BINS SYSTEM CONSISTS OF ONE MO&ULt  CONTAIN-
ING A TWIN VARIABLE THROAT VtNTURI SCRUBBER FOLLOWED BY  A SEPARATOR
IN SERIES WITH A SINGLE-STAGE PERFORATtD-PLATF WASH TOWER.  PRIMARY
PARTlCULAlE CONTROL 1$ PROVIDED BY UPSTREAM MECHANICAL COLLECTORS.
AN INDIRtCT STEAM HOT AIR REHEAT SYSTEM RAISE? THE GAS TEMPERATURE  IOF
PRIOR TO DISCHARGE TO THE MAIN STACK. THE fLUE 6AS CLEANING WASTES  ARE
ULTICATEIY DISPOSED IN AN ON-SITfe CLAY-LINED SOLAR EVAPORATION  POND.
 NEVADA POWER
 REID  GARDNER
 ?
 RETROFIT   125.0  MW  
           125.0  MW  (FSC>
 COAL
   .50 XS
 SODIUM CARBONATE
 ADL/COMBUSTION EQUIP  ASSOCIATE
 ENERGY CONSUMPTION: ****X
 STATUS 1      STARTUP
 NEVADA POWER
 REID GARDNER
 J
 NF>       125.0 »w (GROSS)
           125.0 I*W 
 COAL
   .$0 tS
 SODIUM CARBONATE
 ADL/COMBUSTION E6UIP ASSOCIATE
 ENERGY CONSUMPTION: ****%
 STATUS 1     STARTUP  6/76
REFEK TO SECTION 3 OF THIS RtPORT FOR ADDITIONAL INFORMATION.  THIS  SODIUM
CARBOKATf-BASED (TRONA) SCRUBBING SYSTEM CONSISTS OF ONE MODULE  CONTAIN-
ING A TWIN VARIABLE THROAT VENTUR1 SCRUBBFR FOLLOWED PY A SEPARATOR
IN SERIES WITH A SINGLE-STAGE PERFORATED-PLATE WASH TOWER.  PRIMARY
PARTKULfU CONTROL IS PROVIDED BY UPSTREAM MECHANICAL COLLECTORS.
AN INDIRECT STEAM HOT AIR REHEAT SYSTEM RAISES THE GAS TEMPERATURE  3CF
PRIOR TO DISCHARGE TO THE MAIN STACK. THE FLUE GAS CLEANING  WASTES  ARE
ULTIKATEIY DISPOSED IN AN ON-SITE CLAY-LINED SOLAR EVAPORATION POND.
REFER TO SECTION J Of THIS REPORT FOR ADDITIONAL INFORMATION.
THIS UM 1 IS A NEW COAL-FIRED BOILER THAT IS ESHIPPED WITH  SODIUM
CARBONATt-BASED (TRONA) SCRUBBING SYSTEM WHICH INCORPORATES  A TWIN
VARIABLE-THROAT VtNTURI SCRUBBER FOLLOWED BY A SEPARATOR IN  SERIES  WITH
A SINGLE-STAGE PERFORATED-PLATE WASH TOWER. MECHANICAL COLLECTORS PROVIDE
PRIMARY  FARTICULATE CONTOL. REHEAT IS PROVIDED BY A  INDIRECT STEAM  HOT
AIR REHI/iT SYSTEM. WASTE IS DISPOSED IN AN ON-SITE CLAY-LINED POND.
 NEVADA POWER
 PEID GARDNER
 4
 NEW       ?50.0 MW (GROSS)
           250.0 MW (fEC>
 COAL
   .75 XS
 PROCESS NOT SfcLECTED
 VENDOR NOT SELECTED
 FNER6Y CONSUMPTION: ****X
 STATUS 6     STARTUP
NEVADA PCVER COMPANY HAS SCRAPPED THjIR ORIGINAL PLANS TO MAKE UNIT  4  A
COPY OF  IMIT 3. THE NEW PLANS CALL FOR A ?50-MU UNIT TO BE  IN  OPERATION
BY U§3. THE UTILITY IS PRIPARJN6 SPEC 1 fitATIONS AT THIS TIME.
CONSTRUCTION IS SCHEDULED TO START IN 1980.
 NEVADA POWER
 WARNER VALLEY
 1
 NEW       ?5C.O MW (GROSS)
           250.0 MW (ESC)
 COAL
 ***** XS
 PROCESS NOT SELECTED
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION: *****
 STATUS 6     STARTUP  6/64
SPECIFICATIONS ARE BEING PREPARED  FQft A SCRUBBING SYSTEM. NEVADA  POWER
HAS NOT  UT ANNOUNCED  PLANS  FOR  THIS UNIT'S EMISSION  CONTROL  STRATEGY.
 NEVADA POWER
 WARNER VALLEY
 ?
 NEW        250.0 MW (GROSS)
           250.0 MW (ESC)
 COAL
 *****  xs
 PROCESS NOT SELECTED
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION: ****x
 STATUS 6     STARTUP  6/85
SPECIFICATIONS ARE BEING PREPARED  FOR  A SCRUBBING  SYSTEM.  NEVADA POWER
HAS NOT  IfT ANNOUNCED  PLANS  FOR  THIS UNIT'S  EMISSION  CONTROL  STRATEGY.
                                                 20

-------
                                              tPA  UTILITY  F6D  SURVEY:  DICIMBER  1978  - JANUARY  1979
                                              SECTION  2
                                        STATUS  OF  FGD  SYSTEMS
UNIT IDENTIFICATION
                                                                  ABSTRACT
NEW ENGLAND ELECTRIC  SYSTEM
BRAYTON POINT
3
RETROFIT  650.0 MW  (GROSS)
          650.0 MW  (ESc)
OIL
 1.00  XS  LOW  SULFUR
PROCESS NOT SELECTED
VENDOR NOT  SELECTED
ENERGY CONSUMPTION: *****
STATUS 7      STARTUP   O/  0
NEW IMGLjNO ELECTRIC SYSTEM HAS REQUESTED PERMISSION TO BURN 1.5X SULFUR
COAL AT THIS UNIT. THIS IS ALLOWABLE UNDER STATE STANDARDS BUT $03
EMISSIONS WOULD BE ABOVE ALLOWABLE FEDERAL LEVELS. A DECISION BY THE EPA
IS STILL PENDING.  MEANWHILE, THE UTILITY IS INVESTIGATING VARIOUS ADVANCE
REGENEKAILE F60 SYSTEMS WHICH OFFER A BREAKTHROUGH IN OPERATING COSTS
AND PRODICE ELEMENTAL SULFUR AS AN END PRODUCT. THE UTILITY IS CURRENTLY
INVOLVED IN BENCH AND LABORATORY SCALF INVESTI6ATIONS OF SULfUR RECOVERY.
THIS UNIT IS CURRENTLY OPERATIONAL FIRING LOW SULFUR FUEL OIL.
 NIAGARA  MOHAWK POWER COOP
 CHARLES  R.  HUNTLEV
 66
 RETROFIT  1CO.O MW (GROSS)
           100.0 MW (ESC)
 COAL
  1.60 XS
 AQUEOUS  CARBONATE
 ROCKWELL INTERNATIONAL
 ENERGY CONSUMPTION: *****
 STATUS 3     STARTUP  0/82
A CONTRACT WAS AWARDED TO ATOMICS INTERNATIONAL F()R THE DESIGN AND
INSTALLATION OF AN AOUEOUS CARBONATE FGD SYSTEM. THIS DEMONSTRATION
SYSTEM WILL PRODUCE END-PRODUCT SULFUR. FUNDS ARE BEING PROVIDED BY THE
U.S. EPA AND THE EMPIRE STATE ELECTRIC ENERGY RESEARCH CORP. THE DESIGN
502 REMOVAL EFFICIENCY HILL cE 90 PERCENT.  ROCKWELL INTERNATIONAL IS
PRESENTLY IN THE DESIGN PHASE.
 NORTHERN INDIANA PUB SERVICE
 BAIILY
 r
 RETROFIT  190.0 MW (GROSS)
           190.0 MW (F$C>
 COAL
  3.00 XS
 PROCESS NOT SELECTED
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION! *****
 STATUS 6     STARTUP  O/ 0
NORTHERN INDIANA PUBLIC SERVICE IS CURRENTLY CONSIDERING A LIME OR LIME-
STONE SCRUBBING UNIT FOR BAULY 7 AND 8. THEY ARE ALSO WAITING FOR
PERFORM ME RESULTS OF THE WELLMAN LORD/ALLIED CHEMICAL UNIT IN SERVICE
AT DEAN h. MITCHELL 11. LOW SULFUR COAL MAY BE EMPLOYED TO COMPLY WITH
$02 EHSJION REGUALTIONS. APPLICABLE INDIANA 502 REGULATIONS ARE STILL
NOT FIRMIY ESTABLISHED*
 NORTHERN INDIANA PUB SERVICE
 BAILLY
 a
 RETROFIT  too.o MW  (GROSS)
           400.0 MW  (ESC)
 COAL
  3.00 XS
 PROCESS NOT SELECTED
 VENDOR NOT SELECTED
 INER6Y CONSUMPTION: *****
 STATUS 6     STARTUP  O/ 0
 NORTHERN INDIANA PUBLIC SERVICE IS CURRENTLY CONSIDERING A LIME OR LIME-
 STONE SC TUBBING UNIT FOR BAULY 7 AND 8. THEY ARE ALSO WAITlNfi FOR
 PERFORMANCE  RESULTS OF THE WELLMAN LORD/ALLIED CHEMICAL UNIT IN SERVICE
 AT  DEAN  *. MITCHELL 11. LOW SULFUR COAL MAY 81 EMPLOYED TO COMPLY WITH
 $02  IMISSION REGULATIONS. APPLICABLE INDIANA $02 REGULATIONS ARE STILL
 NOT  FIRMLY ESTABLISHED.
 NORTHERN INDIANA PUB SERVICE
 DEAN H. MITCHELL
 11
 RETROFIT  115.0 MW  (GROSS)
           115.0 MW  (ESC)
 COAL
  3.SO XS
 WELLMAN LORD
 DAVY poufRGAs
 ENERGY CONSUMPTION: *****
 REFER  TO SECTION 3 OF THIS REPORT f(}R ADDITIONAL INFORMATION
 THIS  FGt> SYSTEM IS AN INTEGRATION OF THE WilLMAN-LOR D $02 RECOVERY
 PROCESS  CFFERED BY DAVY POWERGAS AND THE $02 TO SULFUR REDUCTION PROCESS
 DEVELOPED BY ALLIED CHEMICAL. DAVY POWERGAS 1$ THE DESIGN AND
 CONSTRUCTION FIRM AND ALLIED CHEMICAL IS SYSTEM OPERATOR AND PRODUCT
 MARKETER! PERFORMANCE TESTS kERE SUCCESSFULLY COMPLETED ON SEPTEMBER 14.
 1977.  A  DEMONSTRATION YEAR COMMENCED ON SEPTEMBER 16* 1977.
 STATUS  1
              STARTUP  7/76
 NORTHERN STATES POWER
 SHERBURNE
 1
 NEW       720.0 MW  (GROSS)
           720.0 MW  (ESC)
 COAL
   .80 XS  SUBBITUMI NOUS
 LIMESTONE/ALKALINE  FLYASH
 COMBUSTION  ENGINEERING
 ENERGY CONSUMPTION:  Z.82
 STATUS 1      STARTUP  3/76
 REFER  TO  SECTION 3 OF THIS REPORT FOR ADDITIONAL INFORMATION.
 FULL COMMERCIAL OPERATION OF THE SVSTEH BEGAN ON MAY 1, 1976. THE SCRUB-
 BING SYSTEM  FOR THIS UNIT CONSISTS OF 12 MODULES. EACH SCRUBBING MODULE
 INCORPORATES A VENTRI-ROD SECTION AND A MARBLE BED ABSORBER FOR PAR-
 TICULATE  AND SULFUR  DlOXjDE REflOVAL* A FORCED OXIDATION SYSTEM CONVERTS
 ALL  THE  CALCIUM SULFITE  TO SULFATE PRIOR TO DISCHARGE TO A CLAY-LINED
 SETTLING  POND. STACK GAS REHEAT  IS PROVIDED BY IN-LINE HOT WATER TUBES.
 THE  COAL  BURNED AT THIS  UNIT CONTAINS 0.8X SULFUR AND 9-10X ASH.
                                                 21

-------
EPA IU1L1TY  FbD  SU'-VEY: D E t I pf f R  1971'  - JANUARY 1979
                                               SECTION  2
                                         STATUS OF FGD  SYSTEMS
UNIT  1DENTIflCATION
                                                                    ABSTRACT
NORTHERN  STATES POWER
SHE Rf'URNE
2
NEW        720.0 KW (GROSS)
           730.0 fU (ESc)
COAt
   .80  %S   SUEBITUMINOUS
LIMESTONF/ALKALINE FLYASH
COMBUSTION ENCIPHERING
ENERGY CONSUMPTION:   2.ax
STATUS 1      STARTUP  4/77
                                REFER TO SECTION  3  OF THIS REPORT  FOR  ADDITIONAL INFORMATION.
                                THE SHER-URNE  NO. 2 AIR SUAL1TY CONTROL  SYSTEM jS IDENTICAL  IN  DESIGN TO
                                THE SYSTf*  IN  OPERATION ON THE NO.  1 UNIT  AT THIS STATION. TWELVE  2-STA6E
                                PARTICIPATE  SCRUBBER (VENTRI-ROD SCRUBBER)  AND SULFUR DIOXIDE ABSORBER
                                (MAR6LE-:''ED  ABSORBER) MODULES ARE  PROVIDED  FOR FLYASH AND S02 CONTROL.
                                ELEVEN MCDULES ARE  EQUIPPED FOR fU|.L C-ENERATIN6 CAPACITY OPERATIONS.
                                THE CALCIUM  SULFITE IS FORCIBLY OXIDIZED TO SULFATE PRIOR TO DISCHARGE  TO
                                THE DISPfSAL POND.  IN-LINE NOT WATER TUBES  PROVIDE STACK GAS REHEAT.
NORTHERN STATES POWER
SHERRURNF
N£U

COAL
  .PO iS
L 1KESTONE
           860.0 KW  (GROSS)
           720.0 My  
TWO ADDITIONAL  COAL-FIRED  PC WER-GE N ERATIN6 UMTS  ARE  SCHEDULED TO BE IN-
STALLED  H NSP'S SHERBURNE  COUNTY 6ENERATIN6  STATION  IN BECKER MINNESOTA.
A LETTER OF INTENT  HAS  BEEN S16NEO WITH C-E FOR A LIMESTONE SLURRY SPRAY
TOWER SYHEM FOR THIS  NEW  860-MU UNIT. THE 2-STAGE  SCRUBBING SYSTEM WILL
REMOVE PARTICULATES  (?9.sx> & soz (8ox>. THE  BOILER CONTRACT HAS SEEN
AWARDFD  10 BAB COCK  S WILcOX AND THE TURBINE WILL  BE SUPPLIED BY GENERAL
ELECTRIC, START-UP  HAS  BEEN DELAYED TO WAY 1984 AND CONSTRUCTION START-Up
HAS ertN BELAYED UNTIL  APRIL 1980 DUE TO ENVIRONMENTAL PROBLEMS.
 ENERGY CONSUMPTION:  *****
 STATUS I     STARTUP   5/84
 OTTER TAIL POWER
 COYOTE
 1
 NEW       440.0 MW  (GROSS)
           44P.O WW  (ESC)
 COAL
   .87 X5  LIGNITE
 AflUEOUS CARBONATE  (OR*  COLLECT
 WHEELABRATOR-FRYE/R.I.
 CNFR6V CONSUMPTION: ****%
 STATUS 2     STARTUP  5/51
                                THIS  NEW  COAL-URED STATION IS JOINTLY  OWNED  BY FIVE UTILITIES.  OTTER
                                TAIL  POWER  IS THE MAJOR OWNER AND  CONSTRUCTOR. MONTANA-DAKOTft  UTItIT£S
                                IS  THE  FACILITY OPERATOR. THIS PLANNED  UNIT WILL FIRE LOW SULFUR LI6NITE
                                FROM  THE  KERCER COUNTY AREA IN A BgW CYCLONE  BOILER. THE CONTRACT  FOR
                                THIS  AQUSOUS  CARBONATE/FABRIC FILTER S02  SCRUBBER-ABSORBER WAS AWARDED  TO
                                WHEELARRJTOR-FRYE AND ATOMICS INTERNATIONAL.  THE DRY REMOVAL SYSTEM
                                COMBINES  AI'S AQUEOUS CARBONATE PROCESS IN  A  W-f FABRIC FILTER.  UNIT
                                CONSTRUCTION  IS NOW JOX COMPLETE AND FGD  SYSTEM CONSTRUCTION HAS JUST
                                tEGUK,.
 PACIFIC GAS ft ELECTRIC
 FOSSIL
 1
 NEW       sec.D MM  <€ROSS>
           (5CO.O MW  (ESC)
 COAL
   .80 ZS
 LIMESTONE
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION:  *****
 STATUS 6      STARTUP 0/35
                                 PGRE  AMNCUNCED  PLANS TO BUILD TWO  600-MW  COAL-FIRED POWER GENERATING
                                 UNITS IN NORTHERN CALIFORNIA. THE  FIRST UNIT WILL BURN COAL  WITH  A
                                 HEATING  VALUE OF 12000 BTU/LB, 0.8X  SULFUR  AND 101 ASM CONTENTS.  THE
                                 SECOND  UNIT WILL BURN COAL OF AN EOUAL OR BETTER QUALITY. THE  EMISSION
                                 CONTROL  
-------
                                                 EPA  UTILITY FGB  SURVEY: DECEMBER  1978 - JANUARY  1579
                                                 SECTION 2
                                           STATUS  Of  FGO SYSTEMS
UNIT  IDENTIFICATION
                                                                      ABSTRACT
PENNSYLVANIA POWER
PRUCE  MANSFIELD
1
NEW        917.0  MW  (GROSS)
           917.0  MW  (ESC)
COAL
 3.00  XS  PITUM1NOUS
I IME
CHEMICO
FNERGY CONSUMPTION:  6.OX
STATUS 1      STARTUP 12/75
                  REFER  TO SECTION  I  OF  THIS REPORT  fOfi ADDITIONAL  INFORMATION.
                  THIS  EMISSION CONTROL  SYSTEM WAS DESI6NED TO REMOVE  FLYASH AND  S02  FROM
                  3.35  KM ftCFM OF  FLUEGAS USING  THIOSOJteiC LIME  AS  A  SCRUBBING ABSORBENT.
                  THE  INITIAL SHAKEDOWN  AND DEBUGGING  PHASE OF OPERATION BEGAN FOR  PART OF
                  THE  SYSTFtf IN DECEMBER 1975. PARTIAL COMMERCIAL  OPERATION COMMENCED  IN
                  APRIL 1976. THE  UNIT VAS CERTIFIED  FULL-LOAD COMMERCIAL IN JUNE 1976.
                  THE  FC.D SYSTEM  HAS  EXPERIENCED  OPERATIONAL PROBLEMS  SjNCE IT HAS  BEEN IN
                  SERVICE ft QUIRING A NUMBER OF  SYSTEM REPAIRS AND  DESIGN MODIFICATIONS.
PENNSYLVANIA  POWER
PRUCE MANSFIELD
?
NEW       917.0  MW (GROSS)
           917.0  MW (ESC)
COAL
  3.00 XS  BITUMINOUS
LIME
CHEMlCO
FNERGY CONSUMPTION:  6.05!
STATUS 1      STARTUP  7/77
                   REFER TO SECTION  3  OF THIS RfcPORT  FOR ADDITIONAL  INFORMATION.
                   THIS EMISSION  CONTROL SYSTEM WAS  DESIGNED TO REMOVE  FLYASH AND  S02  FROM
                   3.35 *M flCFM OF  FLUE 6AS USING  THIOSORBIC LIME  AS A  SCRUBBING ABSORBENT.
                   SIX  SCRUtBING  TRAINS, EACH INCLUDING TWO VENTURI  SCRUBBERS IN SERIES
                   ARRANGEMENT, ARE  PROVIDED FOR  FULL-LOAD OPERATION. THE INITIAL  SHAKEDOWN
                   AND  6EBUC-GING  PHASE OF OPERATION  BEGAN FQR THREE  TRAINS IN JULY,  1977.
                   FULL COMMERCIAL  OPERATION FOR  THE  ENTIRE SYSTEM  COMMENCED ON OCTOBER  1,
                   1977.
 PENNSYLVANIA  POWER
 BRUCE MANSFIELD
 3
 NEV        917.0 MW (GROSS)
            917.0 MW (ESC)
 COAL
  3.00 XS
 LIME
 PULLMAN KELLOGG
 ENERGY  CONSUMPTION:  *****
 STATUS  2      STARTUP   4/80
                   A CONTRACT  WAS  AWARDED TO PULLMAN KELLOGG FOR  THE  FGD SYSTEM AT THIS
                   UNIT. THC EMISSION CONTROL  SYSTEM FOR THIS UNIT  WILL  CONSIST OF ESP'S
                   UP-STREAf OF  FIVE  WEIR HORIZONTAL CROSSFLOW WET  SCRUBBING MODULES.
                   EACH KODILE CONSISTS OF SIX  STAGES, ONE BEING  A  SPARE. SLUDGE WILL  BE
                   DISPOSED OF BY  THE EXISTING  SYSTEM AT THE BRUCE  MANSFIELD PLANT. L1KER
                   IN THE SUCK  WILL  BE AN INCONEL  625 MATERIAL.  THE  UNIT IS CURRENTLY
                   UNDER COKSTRUCTION WITH ESP'S  70-80 PERCENT COMPLETE  AND THE FGf
                   SYSTEM 3C PERCENT  COMPLETE.  UNIT  START-UP WILL BE  IN  APRIL 1980.
 PHILADELPHIA ELECTRIC
 CROMOY

 RETROFIT   150.0 My  (GROSS)
            150.0 MW  (ESC)
 COAL
  3.00 XS
 MAGNESIUM  OXIDE
 UNITED  ENGINEERS
 ENERGY  CONSUMPTION:
 STATUS  6
                   THE UTILITY  PLANS TO RETROFIT  ONE OF THE TWO BOILERS  AT CROMBY VlTH  AN
                   FGD SYSTtK.  HOWEVER, A FINAL  DECISION HAS NOT  BEEN  MADE. THE SYSTEM
                   BEING GIVEN  PRIMARY CONSIDERATION IS MAGNESIUM  OXIDE. CURRENTLY, THE
                   UTILITY  IS  RE-NEGOTIATING CONSENT ORDERS AND THE  START-UP DATE OF JUNE
                   1980 IS  TENTATIVE.
       * ** *%
STARTUP  6/SO
 PHILADELPHIA ELECTRIC
 EDDYSTONE
 1 A
 RETROFIT   12Q.O My  (GROSS)
            120.0 WW  (ESC)
 COAL
  2.60  XS
 MAGNESIUM  OXIDE
 UNITED  ENGINEERS
 ENERGY  CONSUMPTION:  *****
                   REFER TO  SECTION 3 OF THIS  REPORT FOR ADDITIONAL  INFORMATION.
                   THE EMULSION CONTROL SYSTEM  FOR  THIS UNIT CONSISTS  OF THREE PARALLEL
                   SCRUtiBINE TRAINS FOR THE CONTROL  OF PARTICULATE  AND  SULFUR DIOXIDE.
                   THE C-SICE  SCRUBBING TRAIN  INCLUDES -AN SO? ABSORBER  MODULE IN SERIES
                   WITH A  P*RTICULATE SCRUBBER.  APPROXIMATELY ONE-THIRD OF THE BOILER  FLUE
                   6AS IS  SCRUBBED WITH MAGNESIUM  OXIDE SLURRY FOR  SO 2  REMOVAL. THE  SPENT
                   SLURRY  IS REGENERATED AT THE  ESSEX SULFURIC ACID  PLANT IN NFWARIT, N.J.
                   THE REGENERATED MASOX IS RETURNED TO THE PLANT  FOR  S02 SCRUBBING  SERVICE.
 STATUS  1
               STARTUP   9/75
 PHILADELPHIA ELECTRIC
 EDDYSTONE
 IB
 RETROFIT   240.0 MW  (GROSS)
            240.0 MW  (ESC)
 COAL
  2.60  XS
 MAGNESIUM OXIDE
 UNITED ENGINEERS
 ENERGY CONSUMPTION!  *****
 STATUS A      STARTUP  6/PO
                   THE INSTPILATION OF AN  FGD  SYSTEM ON THE BALANCE  OF THE FLOE GAS  FROM
                   THIS UNIT  WILL FOLLOW PENDING THE OUTCOME OF  THE  PERFORMANCE OF  THE
                   EXPERIME HAL  SCRUBBING  UNIT  WHICH HAS BEEN  INSTALLED AND CURRENTLY
                   OPERATIONAL ON THIS UNIT. CURRENTLY, 3 PARTICULATE  SCRUBBERS ARE  TREATING
                   THE FULL GAS  LOAD FROM  THIS  UNIT. CONSENT ORDERS  ARE PRESENTLY BEING
                   RE-NEGOTlftTED AND THE START-IP DATE OF JuNE,  1980 IS TENTATIVE.

-------
EPA UTILITY  FtO  SURVEY: DECEMBER
                                        - JANUARY 1979
                                               SECTION  2
                                         1TATUS OF  FED  SYSTEMS
UNI T  1DENTJ FI CAT1 ON
                                                                    ABSTRACT
PHILADELPHIA ELECTRIC
EOOYSTONF
?
RETROFIT   334.0 f,y (CROSS)
           334.0 MW lESC)
COAL
 2.50  XS
l-APNE SIUM  OXIDE
UNITED  ENGINEERS
FNERGY  CONSUMPTION:  *****
STATUS  6      STARTUP   6/FO
THE UTILITY  IS  AWAITING PERFORMANCE RESULTS  FRO* THE EXPERIMENTAL F60
SYSTEM INSTALLED  ON  UNIT 1 AT THIS STATION  BEFORE PRECEEDING  WITH THE
DESIGN Of AN  FDD  SYSTEM FOR THIS COAL-FIRED  BOILER. THE  SYSTEM  PEIN6
6IVEK PRIMARY  CONSIDERATION IS MAGNESIUM  OXIDE, DESIGNED JOINTLY Bt
UNITES E!>filNtERS  AND PHILADELPHIA  ELECTRIC.  CURRENTLY, THE  UTILITY IS
RE-NEGOT IATING  CONSENT ORDERS AND  THE  START  UP DATE OF JUNE  1980 is
TENTATIVE.
POTOMAC  ELECTRIC POWER
01CKERSON
4
NEW        scc.o MW  (F.ROSS)
           PCO.O MW  (FSC)
COAL
  2.00 IS
PROCESS  NOT StLECTED
VENDOR NOT SELECTED
ENERGY CONSUMPTION: *****
STATUS 6     STARTUP   5/85
THERt ARL NO  FIRM  PLANS FOR INSTALLATION  OF  AN FGD SYSTEM.  STARTUP DATE
OF THE BULER IS PLANNED FOR 1985.  THIS UNIT WILL BURN 2i SULFUR  COAL
V.ITH A HATING  VALUE OF 11000 BTU/L6.
 POWER  AUTHORITY OF NEW  YORK
 ARTHUR KILL

 NEW       700.0 MW  (GROSS)
           700.0 KW  (FSC)
 COAL
  3.00  *S
 PROCESS NOT SELECTED
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION:  *****
 STATUS 6     STARTUP  11/P8
THE UTILITY  IS  CONSIDERING ROTH  REGeNfRABLE AND LIMESTONE FGD  PROCESSES.
FGD TECHNOLOGY  IS BEING CONSIDERED  FOR  A  FOSSIL FUEL BURNING UNIT WHICH
KILL EMPLOY  COAL AS THE PRIMARY  FUEL  AND  OIL AS BACKUP. REFUSE  WILL ElE
PROVIDED  SS  A  SUPPLEMENTAL FUEL  SUPPLY. THE PREFERRED PLANT  SITE IS THE
ARTHUR  KILL  FACILITY LOCATED ON  STATEN  ISLAND. THE PROJECT DESIGN
ENGINEERING  FIRM IS SARGENT  AND  LUNDY.  pUBLK SERVICE COMMISSION HEARINGS
ARE IN  PROGRESS.
 PUBLIC SERVICE  OF  INDIANA
 GIBSON
 5
 NEW       650.0 WW  (GROSS)
           650.0 «W  (FSC)
 COAL
  3.30 XS
 PROCESS NOT  SELECTED
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION: *****
 STATUS 5      STARTUP  0/82
PUBLIC  SERVICE  CO OF INDIANA ANNOUNCED  PLANS FOR THE CONSTRUCTION OF THIS
NEW  iSC-*V  COAL FIRED POWER GENERATING  UNIT AT GIBSON  STATION.  FjIDS HAVE
BEEN  RECiEVED AND ARE BEING EVALUATED.  INITIAL START-UP  IS  SCHEDULED FOR
1982.
 PUBLIC SERVICE  OF  NEW MEXICO
 SAN JUAN
 1
 RETROFIT  361.0 MW (GROSS)
           361.0 MW (ESC)
 COAL
   .80 IS
 UELLMAN LORD
 DAVY POWERGAS
 ENERGY CONSUMPTION: *****
 REFER  TO  SECTION 3 OF THIS REPORT  FOR  ADDITIONAL INFORMATION. THIS FGD
 SYSTEM IS AN INTEGRATION OF  THE  WELL*AN LORD SO? RECOVERY  PROCESS OF
 DAVY  POWERGAS AND ALLIED CHEMICAL'S S02 REDUCTION TO  SULFUR  PROCESS. A
 HOT SIDE  ELECTROSTATIC PREC1PITATOR P&ECEfDS THE F6D  SYSTEM. OF THE FOUR
 ABSORBER  ToUERS INSTALLED, THREE ARE NEEDED TO CARV  THE  FULL LOAD. THE
 COAL  PURUD AT THIS UNIT HAS  SULFUR AN!) ASH CONTENTS  OF  .8*  AND 20X
 RESPECTIVELY. THE SYSTEM OPERATES  ON A CLOSED WATER  LOOP WITH
 RIVER  WATER BEING USED AS MAKE-UP  FOR  LOSSES DUE TO  EVAPORATION.
 STATUS 1
               STARTUP  «/78
 PUBLIC SERVICE  OF  NEW MEXICC
 SAN JUAN
 2
 RETROFIT  350.0 MW  (GROSS)
           350.0 MW  (ESC)
 COAL
   .80 tS
 WELLMAN LORD
 DAVY POWERGAS
 FNERGY CONSUMPTION: *****
 STATUS 1     STARTUP  8/78
 REFER  TO SECTION 3 OF THIS  REPORT FOR ADDITIONAL INFORMATION. THIS fGD
 SYSTEM IS AN INTEGRATION OF  THE  WELLMAN LORD S02 RECOVERY PROCESS OF  DAWY
 POWERGASRALLIED CHEMICAL'S  S02  REDUCTION TO SULFUR  PROCESS. A NOT SIDE
 ELECTROSTATIC PRECIPITATOR  PHECEEDS THE FGD SYSTEM. THE  SYSTEM INCLUDES
 FOUR  ABSCRBER TOWERS, THREE  OF  WHICH ARE NECESSARY  TO CARRY THE FULL
 LOAD.  THE WATER LOOP IS CLOSED  WITH RIVER WATER  BEING USED TO MAKE UP FOR
 LOSSES DIE TO EVAPORATION.  THE  COAL BURNED AT  THIS  UNIT  HAS SULFUR AND
 ASH  COHTENTS OF 0.8* AND 20* RESPECTIVELY.

-------
                                              EPA  UTU1TY  FGD SURVEY! DECFM8E.R 197$ - JANUARY  1979
                                               SECTION  2
                                         STATUS  OF  FGD  SYSTEMS
UNIT IDENTIFICATION
                                                                   ABSTRACT
PUBLIC SERVICE  OF  NEW  MEXICO
SAN JUAN
3
NEW        534.0 MW (GROSS)
           534.0 MW (ESc>
COAL
   .BO IS
WELLMAN LORD
DAVY  POKE"eAS
ENERGY CONSUMPTION: *****
                               A CONTRACT  HAS  BEEN  AWARDED TO DAVY POWERGAS TO SUPPLY FOUR  ABSORBER
                               TOWERS  FCR  REMOVAL  OF  S02 AT THIS NEW UNIT. ON| MODULE IS EXpFCTED  fO
                               BE OPERATIONAL  BY JUNE 19y9 WHICH WILL PRIN6 THE UNIT INTO COMPLIANCE
                               KITH  FEftkPAL  NSPS.  THE REMAINING THREE MODULES SHOULD BE OPERATIONAL
                               BY JAflUAfY  1982 AT  WHICH T1MI THE UNIT WILL Bf IN COMPLIANCE OF  STATE
                               STANDARDS.  POWF.R PLANT CONSTRUCTION IS BEHIND SCHEDULE BUT ABSORBER
                               CONSTRUCTION  IS PROCEEDING AS PLANNED. IT IS POSSIBLE THAT Tul  FINAL
                               THREE ABSORBERS HAY  BE IN AS EARLY AS JANUARY 1981.
STATUS  3
              STARTUP  6/79
PUBLIC  SERVICE OF NEW MEXICO
SAN  JUAN
4
NEV        534.0 MW (GROSS)
           534.0 MN (ESC>
COAL
   .BO *S
MELLMAN LORD
DAVY POWFRGAS
ENERGY CONSUMPTION: *****
STATUS 3     STARTUP  1/5Z
                                DAVY  POWCR6AS HAS  BEEN AWARDED A CONTRACT TO SUPPLY  THf  $02  REMOVAL
                                SVSTtP  FCR  THIS UNIT. THE PLANS INCLUDE A WILLflAN. LORD SO?  RECOVERY
                                PROCESS  AS  WELL AS AN UPSTREAM ELECTROSTATIC PRE Ci PI TA TOR FOR  PRIMARY
                                PARTKUMT6  REMOVAL F66 OPERATIONS ARE EXPECTfB TO  BB6IN AT THIS  PLANT
                                IN  JANUARY  1982.
 SALT RIVER PROJECT
 CORONADO
 1
 NEW       350.0 MW (GRQSS)
           780.0 MW (ESC)
 COAL
  1.00 XS  SUBBITUMINOUS
 LIMESTONE
 PULLMAN KELLOGG
 ENERGY CONSUMPTION: *****
 STATUS 2     STARTUP  8/79
                                THIS  NEW UNIT WILL BURN LOW SULFUR WESTERN COAf A MAXIMUM  OF  «0*  OF  THE
                                FLUE  CAS WILL BE SCRUBBED TO MEET SULFUR DIOXIDE EMISSION REGULATIONS.
                                PULLMANmLLQ6& Witt PROVIDE 2 W6IR HORIZONTAL SPRAY TOWERS  UTILIZING
                                LIMESTONE SLURRY FOR SO? CONTROL. THE SYSTEM WILL UTILIZE RUBBER-LINED
                                SLURRY RECYCLE PUMPSt EACH RATED AT 'SQO EPM. RIGIFLAKE-LINED  SCRUBBER
                                HODULIS, VERTICAL HER MIST ELIMINATORS AND A MlNINUM  OF 20  PERCENT  OF
                                THE  FLUE CAS WILL BE PYPASSFD FOR REHEAT. THE SLUDGE WILL BE PONDED-
                                STRUCTURAL  WORK IS 90* COMPLETE.
 SALT RIVER PROJECT
 CORONADO
 2
 NEW
          3SO.O RW  (GROSS)
          280.0 MW  (ESC)
COAL
 1.00 ZS  SUBBITUMINOUS
LIMESTONE
PULLMAN KELL066
ENEftGV CONSUMPTION:  *****
STATUS 2      STARTUP  1/PO
THIS NEW UNIT WILL BURN LOW  SULFUR WESTERN  COAL' A  MAXIMUM  OF  80*  OF  THE
FLUE CAS WILL BE SCRUBBED TO MEET SULFUR DIOXIDE EMISSION  REGULATIONS.
PULLKAN/KFLLOGG WILL PROVIDE ? WEIR HORIZONTAL  SPRAY  TOWERS UTILIZING
LIMESTONE SLURRY FOR SO? CONTROL. THE SYSTEM WILL UTILIZE  RUBBER-LINED
SLURRY RECYCLE PUMPS, EACH RATED^AT 98oo GPM,  RIGIFLAKE-LINED  SCRUBBER
MODULES, VERTICAL HFIl MIST  ELIMINATORS AND A  MINIMUM OF 20 PERCENT OF
THE FLUE GAS WILL BE BYPASSED FOR REHEAT. THE  SLUDGE  WILL  BE PONDED.
STRUCTURAL WORK IS 60* COMPLETE.
 SALT RIVER PROJECT
 CORONADO
 3
 NEW       350.0 MW  (GROSS)
           280.0 MU  (ESC)
 COAL
  1.00 ZS
 LIMESTONE
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION: *****
 STATUS 6      STARTUP  0/87
                                THIS NEW UNIT WILL BURN SULDUR WESTERN COAL. EIGHTY  PERCENT  OF  THE
                                GAS WILL '.'I SCRUBBED TO MEET SULFUR DIOXIDE EMISSION  REGULATIONS.
                                UTILITY IS CURRENTLY CONSIDERING THE INSTALLATION OF  TWO HORIZONTAL
                                SPRAY T04.ERS EMPLOYING A LIMESTONE SCRUBBING SOLUTION TO REMOVE  S02.
                                FROM THE FLUE GA$. SCHEDULED COMMERCIAL OPERATION DATE  IS  1987.  PLANS
                                FOR AN EMISSION CONTROL SYSTEM HAVE NOT BEEN FINALIZED. SLUDGE  WILL
                                PROBABLY BE PONDED.
 SAN MIGUEL ELECTRIC  COOP
 SAN MIGUEL
 1
 NEW       400.0 MW  (GROSS)
           400.0 MU  (ESC>
 COAL
  1.70 ZS  LIGNITE
 LIMESTONE
 BABCOCK K WlLCOX
 ENERGY CONSUMPTION:  *****
 STATUS 2     STARTUP  8/80
                                THE EMISSION CONTROL FOU1PMEM FOR THE  COAL-FIRED  RADIANT BOILER  WILL
                                CONSIST ff AN ESP UPSTREAM OF FOUR LIMESTONE  SCRUBBING  MODULES.  THE
                                SCRUEEER FLUE GAS CAPACITY IS NOMINALLY DESIGNED AT  1.579 MILLION ACFM  .
                                (302 F>. DESIGN S02 REMOVAL  EFFICIENCY  IS  86  PERCENT  FOR 4400 PPM S02
                                INLET. L/P RATIOS ARE 10 AND 45  FOR BUENCHER  AND ABSORBER,  RESPECTIVELY.
                                RESEARCH COTTRELL HAS BEEN AWARDED THE  SLUDGE  DISPOSAL  CONTRACT.  FGD
                                SYSTEM FCUNOATION AND STRUCTURAL STEEL  WORK IS  COMPLETE. INITIAL  START-
                                UP IS SCHDULED FOR LATE SUMMER  19EO.
                                                  25

-------
FPA UTILITY  FED  SURVEY: t>fcCEI»BFR 197F - JANUARY  1979
                                               SECTION  2
                                         STATUS  OF  FGO  SYSTEMS
UNIT  IDENTIFICATION
                                                                   ABSTRACT
SEMINOLE
SEM1NOLE
1
NEW
          ELECTRIC
           fc2o»0 MW (GROSS)
           620.0 MW (ESC)
COAL
  2.75  XS
LIMESTONE
VENDOR NOT SELECTED
FNER6Y CONSUMPTION: *****
STATUS 6     STARTUP  6/F-3
SEMINCLE FLtCTRIC HAS  ANNOUNCED  PLANS TO CONSTRUCT ONE AND  POSSIBLY TWO
NEW 600 Hi COAL-FIRED  UNITS.   THE UTILITY INTENDS TO UTILIZE  ESPs  FOR PAR-
TICULATE REMOVAL AND A LIMESTONE F«D SYSTEM FOR S02 CONTROL  OF  EMISSIONS
FROM THE HURMN6 OF 2.75X  SULFUR, 8.5* ASH COAL (11000 BTU/LB HEATING
VALUE). 7HE UTILITY EXPECTS  TO  INITIATE REOUESTS FOR BIDS FOR THE  F6D
SVSTtl" IN NAY 1979.
SIKESTON
SIKESTON
1
NEW

COAL
 2.80 XS
LIMESTONE
PAPCCICK R
FNERGY
STATUS
          BOAPD OF PUNIC. UTIl.
           23T .0
           235.0
                 *W
                    (CROSS )
                    (F.SC)
e&W MS  /WARDED A CONTRACT  FOR  THE  BOILER AIR 8UALITY CONTROL  SYSTEM.
THE AGCS WILL CONSIST  OF  2  ESP'S FOLLOWED BY 1 F6D MODULES,  EACH  CAPABLE
OF HANDLING 50% OF  THE  BOILER LOAD; ONE WILL BE ON STAND-BY  AT  ALL  TIMES.
THE UNIT KILL BURN  A ?.fit SULFUR COAL. THE SIKESTON STATION  UILL  FEATURE
AN FRP-LJNED STACK, 2  PONDS  (ONE FOR FLY ASH, ONE FOR SCRUBBER  SLUDGE-
FjOTTCf A fH DISPOSAL).  AND *  AXlAL FLOW FANS. NO STACK 6AS  REHEAT  IS
PLANf.ED.  MAXIMUM FLUF  CAS  CAPACITY IS 74B,390 ACFM AT 288  F.
STRUCTURAL STEEL ERECTION IS NOW ABOUT 33* COMPLETE
           W1LCOX
        CONSUMPTION! *****
        2     STARTUP  6/«1
 SOUTH CAROLINA PUBLIC SEPVICt
 WINYAH
 ?
 NEW       280.0 MW  (GROSS)
           140.0 MM  (ESC)
 COAL
  1.00 XS  BITUMINOUS
 LIMESTONE
 PABCOCK R WILCOX
 ENERGY CONSUMPTION:   .7*
 STATUS 1     STARTUP  7/77
                                 RF.FF.R TO  SECTION  3  OF  THIS  REPORT FOR ADDITIONAL INFORMATION.
                                 THI  EMISSION  CONTROL 5YSTIH FOR THIS UNIT CONSISTS OF  A  100*  CA^ACHY ESP
                                 FOLLOWED  HY A 5CX CAPACITY  LIMESTONE 'GD SYSTEM. ONE FgD  MODULE, CONSIST-
                                 ING  OF  A  VENTURI  SCRUBBER AND TRAY TOWER ABSORBER, REMOVES  7OX  OF THE
                                 INLFT SQ:>  REHEAT IS SUPPLIED BY FLUE 6AS BYPASS. THE  SCRUBBING WASTES
                                 ARE  DTSCMNGED  TO AN ON-SITg, UNLINED DIKED POND. THE  NO. 2 UNIT
                                 COMMENCED INITIAL OPERATION IN JULY 1977.
 SOUTH CAROLINA PUBLIC SERVICE
 WINYAH
 3
           300.0 MW  (GROSS)
           300.0 PW  (ESC)
 NEW

 COAL
  1.70 XS
 LIMESTONE
 RABCOCK 8 WILCOX
 ENERGY CONSUMPTION: *****
 STATUS 3     STARTUP  5/HO
A CONTRACT  HAS  BEEN  AWARDED TO BABCOC* R WlUOX FOR  THE  INSTALLATION
OF  THE  Ffti  SYSTEM  ON THIS UNIT. PARTICULATt REMOVAL  WILL  BE  PROVIDED
BY  RfSEAKH COTTRELL FSP'S. THE BOILER IS A COAL-FIRED DRY-BOTTOM UNIT
WHICH WILL  BURN COAL WITH A 1.7X SULFUR CONTENT AND  A, HEAT  VALUE  OF
11,SCO  B1U/LB.  THE  GENERATING EQUIPMENT IS BEING SUPPLIED BY R1LEY
STOKER.   100X  OF THE FLUE GAS WILL BE SCRUBBED.  ALL FGD  FOOTINGS
HAVE BEEF. POURED AND BOILER STRUCTURAL STEEL WORK  IS NEARLY  COMPLETE.
 SOUTHERN CALIFORNIA  EDISON
 ALAMITOS
 6
 RETROFIT  480.0 MW  (GROSS)
           175.0 MW  (ESC)
 OIL
   .25 »S
 LIME
 SO. CALIFRON1A  EDISON/STEARNS
 ENERGY CONSUMPTION:  *****
 STATUS 3     STARTUP   1/F2
                                 AS  A  RESILT OF AN "EMISSION OFFSET" AGREEMENT,  STANDARD OIL OF OHIO
                                 HAS  CONTRACTED SCE AND STEARNS AND ROD6ERS  TO  INSTALL A LIKE SCRUBBING
                                 SYSTEM OK ITS EXISTING ALAMITOS 6 UNIT. THE  FGD SYSTEM WILL TREAT ONE
                                 THIRD OF  THE FLUE GAS WITH HORIZONTAL WEIR  MODULES.  REHEAT WILL BE
                                 P»OVI|)ED  bV THE BALANCE Qf THE FLUE GAS. THE SLUDGE  WILL BE DEUATERED BY
                                 CENTRIFUGES OR DISC DRYERS AND HAULED TO AN  OFFSjTE  LANDFILL.
 SOUTHERN ILLINOIS POWER  C00f
 MARION
 4
 NEW       164.0 MU  (GROSS)
           184.0 MW  (ESC)
 COAL
  3.00 XS
 LIMESTONE
 BABCOCK R WILCOX
 ENERGY CONSUMPTION:  ****X
 STATUS 2     STARTUP  5/79
                                 THE  EMISSION CONTROL SYSTEM  fOR THIS NfcW  COAL-FIRED BOILER CONSISTS OF AN
                                 ESP  FOR FARTICULATE CONTROL  FOLLOWED BY 2 SPRAY TOWERS FOR S02 CONTROL.
                                 LIMESTONt  SLURRY WILL BE USED AS THE SCRUBBING  REAGENT. SIPC IS NOT
                                 PLANNING TO UTILIZE FLUE GAS REHEAT AND IS  CURRENTLY PLANNING ON A BRICK
                                 LINING  FCR THE STACK. SIPC INTENDS TO  USE A LANDFILL WITH ASH
                                 STABILIZATION FOR SLUDGE DISPOSAL. CONSTRUCTION IS NEARLY 100X COMPLETE
                                 AND  THE SYSTEM HAS BEEN AIR  TESTED. THE BOILER  IS NOW OPERATING. THE
                                 FGD  SYSTFK WILL START IN HAY.
                                                  26

-------
                                             FPA UTILITY F6D SURVEY! DECEMBER 1971! - .IANUABY 1979
                                              SECTION  2
                                        STATUS  Of FGO  SYSTEMS
UNIT l&ENTIFI CATION
                                                                  ABSTRACT
SOUTHERN ILLINOIS POWER COOP
MARION
s
NEW       300.0 MW  (6ROSS*
          300.0 MW  
COAL
  3.75  XS
Du*L  ALKALI
FMC CORPORATION
FNER6Y CONSUMPTION: ****X
STATUS 2      STARTUP   3/79
THE UTILITY HAS AWARDED A CONTRACT TO fWC FOR TMI INSTALLATION  OF  A
DOUBLE ALKALI SCRUBBING SYSTEM U1U1ZIN6 SODA ASM AND LIMI.  THIS  UNIT
IS A PAR1 OF A NEW POWER STATION LOCATED IN WEST FRANKLIN,  INDIANA.
THE SYSTl<- HILL PRODUCE A FILTIR CAKE WASTI PRODUCT WHICH WILL  PE
DISPOSED OF IN AN ON-SITE LANDFILL. THE PARTICULAR EMISSIONS  WILL
GE COMTRULED BY A BUELL-E.NV IROT ECU COLD-SIDE £$P. THE CONSTRUCTION
WORK AND ENGINEERING IS APPROXIMATELY 78X COMPLETE. THE F6D  SYSTEM
IS ESSENTIALLY COMPLETE.
 SOUTHERN  MISSISSIPPI  ELECTRIC
 R.D.  MORROW
 1
 NEW       200.0 MW (CROSS)
           124.0 MW .6(, RESPiCTIVILY. A WATER SPRAY HAS SEEN ADDED  IN  THE
AY-PASS cue? TO PROTECT THE, LINER FROM TEPPIRATUBE EXCURSION.  SLUDGE  MILL
RE STAUIUZiD WITH FLYASH ANC DISPOSED OF ON-SITE* INITIAL  STARTUP  HAS
BEGUN. HtUEVER RUE TO BOILER PHOEiLENS NO OPERATING TldE HAS  BEEN  ACCUMU-
LATES. ACCEPTANCE TESTIN6 IS IXPICTED IN NOVSMSIR.
 SOUTHERN MISSISSIPPI ELECTRIC
 R.6. HORROW
 2
 NIW       70C.O MW (gROSS)
           124.0 MW (ESC)
 COAL
  1.00 XS
 LlMESTONr
 RILEY STOKE8/tNVlRON6tRJN6
 fNERSY CONSUMPTION: ****»
 STATUS 2     STARTUP  S/79
A CONTRACT WAS AWARDED BY SME TO RILEY STOKIR/INVIRONllRlNS  FOR  THIS
F6D  SYSTEM. PARTICULATES WILL BE CONTROLLFD BY A HIGH-EFFICIENCY ESP
UPSTREAM OF THE FSD SYSTEM. Of SIGN SULFUR DIOXIDE AND PARTICIPATE
EFFICIENCIES ARE B 5 AND W ,(• PERCENT^ RISPiCTIVILY. A WATER  SPRAY  HAS
HEN ADDID IN THE IY-PASS DUCT TO PROTECT THi LINfB FRON TIMPIRATUR1
EXCURSION. SLUDGE WHI BE STAPHUEA WITH FLYASH AND DISPOSED ON THE
PLANT  Silt. CONSTRUCTION OF THE WET LIMESTONE SCRUBBING SYSTEM IS  NOW
IN ITS FINAL STAGES, THF, BOHtfi IS NOW IN OPERATION.
 SOUTHWESTERN ELECTRIC POWER
 HENRY W. PCftKIY
 1
 NEW       720.0 MU (GROSS)
           720.0 MU (ISC)
 COAL
   .80 XS  LISNlTf
 LIMESTONE
 AIR CORRECTION DIVISION, UOF
 ENERGY CONSUMPTION: ***«X
 STATUS 3     STARTUP  2/M
 A CONTRACT  FOR  THE EMISSION  CONTROL SYSTEM HAS 8ffN AVAR BED 10 THE  AIR
 COmCTICN  DIVISION Of UQP.  THE SYSTEM 6ISI6N INCLU»|S TWO COLD-SIDE
 ISP'S  fOt PARTICULATE REMOVAL UP-STREAM FROM 4 SPRAY TOWERS WHICH
 UTIH?l  IIHESTONE SLURRY FOR S02 CONTROL. SLUP6E DISPOSAL WILL BE HANDLED
 iY  AN  JUCS  SYSTIM. START-UP  IS IXPICTIB iY FEBRUARY 198*.
 SPR1NSFIEL6 CITY UTILIT1IS
 SOUTHWEST
 1
 NEW       194.0 MW 
-------
EPA UTILITY  FGD SURVEY:  DECEMBER  197f  -  JANUARY 1979
                                              SECTION 2
                                        STATUS  OF  FGD SYSTEMS
UNIT  IDENTIFICATION
                                                                  ABSTRACT
SPRIN6F1ELD  WATER,  LIGHT  K
DALLMAN
T
           205.0  *w  (GROSS)
           2C5.0  MW  f£Sc>
COAL
  3.70  XS
L1MESTONF
RESEARCH  COTTRELL
ENERGY CONSUMPTION: *«**X
STATUS Z      STARTUP  8/SO
FUR * CONTRACT WAS AWARDED TO RESEARCH COTTRELL FOR THE INSTALLATION Of  A
    LIHESTONi F6D SYSTEM. REQUIRED SULFUR DIOXIDE REMOVAL EFFICIENCY IS  90
    PERCENT. A SLUDGE DISPOSAL STRATEGY HAS NOT BEEN FINALIZED,  GUT THE
    UTILITY IS CONSIDERING EITHER PONDING OR LANDFILL. CONSTRUCTION OF THE
    FCD SYSTEM FOUNDATIONS HAVE BEGUN* ALL SYSTEMS ARE OKI SCHEDULE. THE
    BOILER OHFRATION WA$ SCHEDULED TO COMMENCE IN JuNE 1978.
 ST.  JOE  ZINC
 E.F. WEATON
 1
 RETROFIT   60.0 nW (CROSS)
            60.0 MW (ESC >
 COAL
  3.00 IS
 CITRATE
 BUREAU OF  MINES
 ENERGY CONSUMPTION: ****X
 STATUS 2     STARTUP  4/79
    CONSTRUCTION CONTINUES ON THE CITRATE PROCESS SCRUBBING SYSTEM WHICH WILL
    CONTROL  UJ EMISSIONS FROM A 6Q-HV COAL-FIRED POWER GENERATING UNIT AT
    ST. JOE  .INC. THIS UNIT PROVIDES POWER FOR THE LOCAL UTILITY GRID.
    FGD SYST'I" START-UP IS SCHEDULED FOR DECEMBER 1978. THF, REGENERABLE FED
    SYSTEM WILL PRODUCE ELEMENTAL SULFUR AS A BY-PRODUCT. ALL MAJOR CONSTRUC-
    TION IS  COMPLETE. WIRING AND PIPING WORK IS NOW BEING COMPLETED.
 TAMPA  ELECTRIC
 BIG BEND
 (
 NEW       450.0 MW (GROSS)
           450.0 MW (ESC)
 COAL
  2.50  XS
 PROCESS NOT SELECTED
 VENDOR NOT SELECTED
 SNER6Y CONSUMPTION! *****
 STATUS 6     STARTUP  0/65
    TAMPA ELECTRIC HAS ANNOUNCED PLANS TO INSTALL AN FGD SYSTEM  AT BIG SEND
    4 WHICH  IS SCHEDULED TO BEGIN OPERATIONS EARLY IN 1985. THE  F60 PROCESS
    HAS NOT  If T BEEN SELECTED. PRIM ART PARTICULATE CONTROL WILL  BE PROVIDED
    BY AN ELECTROSTATIC PRICIPITATOR UPSTREAM OF THE FGD SYSTEM. AN INPIRECT
    (STEAM COL) HOT AIR INJECTION REHEAT SYSTEM WILL BE INCLUDED AT THE
    SCRUtiPtR OUTLET. DESIGN SULFUR DIOXIDE REMOVAL EFFICIENCY WILL BE
    90 PERCEIT
 TENNESSEE VALLEY AUTHORITY
 CUMBERLAND

 RETROFIT 1700.0 MW (GROSS)
           600.0 MW (ESC)
 COAL
 ***** XS  BITUMINOUS
 PROCESS NOT SELECTED
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION: «**•%
 STATUS 6     STARTUP  7/82
    TVA INSTALLING A HEAVY-MEDIA COAL-CLEANING SYSTEM AND HAS AGREED TO
    INSTALL  I* 6QO-MW F6D SYSTEM  AT THE CUMBERLAND  PLANT  TO BRING  IT  INTO
    COMPLIANCE WITH STATE AND FEDERAL S02 EMISSION LIMITS.  THE TYPE OF
    FGD SVSTII* CHOSEN WILL BE DETERMINED BY PROTOTYPE LEVEL EVALUATION OF
    SEVERAL  ADVANCED SCRUBBER CONCEPTS.
 TENNESSEE VALLEY AUTHORITY
 JOHNSONVILLE
 1-10
 RETROFIT 1*50.0 MW (GROSS)
           600.0 MW (ESC)
 COAL
 ***** XS
 MAGNESIUM OXIDE
 TVA/UNITFO ENGINEERS
 FNERGY CONSUMPTION: *****
 STATUS 5     STARTUP  0/82
    TVA IS PLANNING TO RETROFIT  A 600-MU MGNESlU*  OXIDE  FGD  SYSTEM  AT  THE
    JOHNSOMV1LLE STEAM PLANT, A  1500-MU COAL-FIRED  STATION.  ENGINEERING
    ASSISTANCE: WILL BE PROVIDFD  BY UNITES  ENGINEERS. THIS  PROJECT  is
    BUDGETTED AT $185 MILLION, INCLUDING THE COST OF A NEW 60D-FT.  STAC*.
 TENNESSEE  VALLEY AUTHORITY
 PARADISE
 1
 RETROFIT  704.0 MU (GROSS)
           704.0 WW (ESC)
 COAL
 *****  XS
 LIMESTONE
 VENDOR NOT SELECTED
 FNFR6Y CONSUMPTION: *****
 STATUS 3     STARTUP  0/82
    TVA IS RtOUESTING/EVALUATINP BID  SPECIFICATIONS  FOR  TWO  LIMESTONE  SLURRY
    FGD SYSTEMS WHICH WILL BE  RETROFITTED  ONTO  TWO 6SO-MW  HIGH  SULFUR  c«AL-
    FIRED BOILERS AT THIS  STATION.  THE  FGD  SYSTEMS HILL  TREAT  10OX  OF  THE
    FLUE GASES FROM BOTH UNITS.  TVA  HAS  PROJECTED  THE  TOTAL  COST OF THE
    PARADISE  FGD SYSTEMS TO  BE  APPROXIMATELY  S220  MILLION  (»170/KW). BID
    REQUEST  MS COMPLETED  BY MID-NOVEMBER  AND EVALUATION IS  NOW IN  PROCESS.
    BIB EVALIATION  IS EXPECTED  TO BE  COMPLETED  BY  JANUARY  1  AND A CONTRACT
    SHOULD EH  AWARDED SHORTLY  THEREAFTER.

-------
                                              EPA  UTILITY f6t SURVEY:  DECEMBER 1978 - JANUARY 1979
                                              SECTION 2
                                        STATUS  OF  FGD SYSTEMS
UNIT IDENTIFICATION
                                                                  ABSTRACT
TENNESSEE VALLEY AUTHORITY
PARADISE
2
RETROFIT  704.0 Hy  (GROSS)
          704.0 MW  (ESC)
COAL
 4.20 XS
LIMESTONE
VENDOR NOT  SELECTED
ENERGY CONSUMPTION: *****
STATUS 3      STARTUP  4/82
TVA IS REQUESTING/EVALUATING BID SPECIFICATIONS FOR TWO LIMESTONE SLURRY
FGD SYSTF*S WHICH WILL BE RETROFITTED ONTO TWO 650-WW HIGH SULFUR COAL-
FIRED BOILERS AT THIS STATION. THE FGD SYSTEMS WILL TREAT 10GX OF THE
FLUE EAStS FROM BOTH UNITS. TVA HAS PROJECTED THE TOTAL COST OF THE
PARADISE F60 SYSTEMS TO Bt APPROXIMATELY *220 MILLION (S170/KW). BIO
REflUtST MS COMPLETED BY WiD-NOVEMBER AND EVALUATION IS NOW IN PROCESS.
BID EVALIATION IS EXPECTED TO BE COMPLETED BY JANUARY 1 AND A CONTRACT
SHOULD B I; AWARDED SHORTLY THEREAFTER.
TENNESSEE  VALLEY  AUTHORITY
SHAWNEE
10A
RETROFIT    10.0  p-W  (GROSS)
            10.0  MW  (ESC)
COAL
  2.90  XS   BITUMINOUS
LIME/LIMESTONE
AIR CORRECTION  DIVISION, UOF
ENERGY CONSUMPTION: **••*
STATUS 1      STARTUP   4/72
REFER TO THE BACKGROUND INFORMATION IN SECTION 3 of TH1$ REPORT. THIS
TURBULEN1 CONTACT ABSORBER  (TCA) L1ME/LIMSSTONE SCRUBBING SYSTEM HAS BCEN
OPERATIONAL SINCE APRIL 197?. THIS TEST PROGRAM IS FUNDED BY THE EPA WITH
TVA AS TI-F CONSTRUCTOR AND  FACILITY OPERATOR. THE BFCHTEL CORP. OF SAN
FRAN(i$c( is THE MAJOR CONTRACTOR* TEST DIRECTOR! AND REPORT WRITER.
TESTING  CHEMICAL ADDITIVES  FOR IMPROVING S02 REMOVAL EFFICIENCY
CONTINUED THROUGH OCTOBER AND NOVEMBER. BOTH VENTURI /SPRAY TOWER AND TCA
SYSTEMS  K:flE OPERATED ON LIMESTONE SLURRY WITH FLY ASH LOADING.
 TENNESSEE  VALLEY AUTHORITY
 SHAWNEE
 100
 RETROFIT   10.0 MW (GROSS)
            10.0 MW (ESC>
 COAL
  2.90 XS  BITUMINOUS
 LIME/LIMESTONE
 CHEMICO
 ENERGY CONSUMPTION: *****
 STATUS 1     STARTUP  4/72
REFER TO SECTION 3 OF THIS REPORT  FOR ADDITIONAL INFORMATION. THIS
VENTURI/SPRAY TOWER LIME/LIMESTONE SCRUBBING SYSTEM HAS BEEN OPERATIONAL
SINCI APfTL 1972. THIS TEST  PROGRAM IS FUNDED BY THE EPA WITH TVA AS THE
CONSTRUCTOR AND FACILITY OPERATOR. THE BECHTEL CORP. OF SAN FRANCISCO IS
THE MAJOt  CONTRACTOR! TEST DIRECTOR, AND REPORT WRITER. TESTING WITH
CHEMICAL ADDITIVES FOR IMPROVING S02 REMOVAL EFFICIENCY CONTINUED
THROUGH OCTOBER AND NOVEMBER. BOTH VENTURI/SPRAY TOWER AND TCA SYSTFMS
WERE OPERATED ON LIMESTONE SLURRY  WITH HIGH FLYASH LOADING.
 TENNESSEE VALLEY AUTHORITY
 WIDOWS CREEK
 7
 RETROFIT  575.0 MW (GROSS)
           575.0 MW (ESC)
 COAL
  3.70 XS  BITUMINOUS
 LIMESTONE
 COMBUSTION ENGINEERING
 ENERGY CONSUMPTION: *****
 STATUS 2     STARTUP 10/80
 TENNESSEE! VALLEY AUTHORITY  ANNOUNCED THAT A CONTRACT HAS SEEN A«ARDED TO
 COMBUSTI (N  ENGINEERING  FOR  A LIMESTONE SLURRY SPRAY TOWER FGD SYSTEM. THE
 FGD  SYSTI.H  WILL TREAT HIGH  SILF'.IH  COAl FLUE GAS. THE SPRAY TOMER ABSORBERS
 WILL BE  CONSTRUCTED OF  317L  STAINLESS STEEL. THE NUMBER 7 UNIT FIRES COAL
 WITH THE SAME CHARACTERISTICS AS THE COAL FIRED  IN UNIT 8. INITIAL
 OPERATION'S  ARE  SCHEDULED  FOR OCTOBER 19SO. THE FGD SYSTEM IS CURRENTLY
 UNDER CONSTRUCTION.
 TENNESSEE VALLEY AUTHORITY
 WIDOWS CREEK
 8
 RETROFIT  550.0 MM (GROSS)
           550.0 MW (ESC)
 COAL
  4.30 XS
 LIMESTONE
 TENNESSEE VALLEY AUTHORITY
 ENERGY CONSUMPTION: *****
 STATUS 1     STARTUP  5/77
 REFER  TO  SECTION 3  OF  THIS  REPORT  FQR ADDITIONAL INFORMATION.
 THE  EMISSION CONTROL SYSTEM  FOR  THIS  516 MW COAL-FIRED POWER GENERATING
 UNIT CONSISTS  OF EXISTING  ELECTROSTATIC PRECIPITATORS FOLLOWED BY FOUR
 PARALLEL  SCRUBBING  TRAINS,  EACH  CAPABLE OF HANDLING 25 PERCENT OF THE
 BOILER FLUE GAS FROM UNIT  8. EACH  TRAIN INCLUDES A RECTANGULAR THROAT
 VENTURI  SCRUBBER AND A  6»IO-TOWER  ABSORBER SUPPLIED By POLYCOM. THE GRID
 TOWER  CA* BE CONVERTED  TO  A  MOBILE-BED TOWER  IF GREATER S02 REMOVAL IS
 REQUIRED .
 TEXAS MUNICIPAL POWER AGENCY
 GIBBONS CREEK
 1
 NEW       400.0 MW (GROSS)
           400.0 «W (ESC)
 COAL
  1.06 XS  LIGNITE
 LIMESTONE
 COMBUSTION ENGINEERING
 ENERGY CONSUMPTION: *****
 STATUS 3     STARTUP  1/82
 COMBUSTICN  ENGINEERING  WAS  AWARDED  A  CONTRACT  TO DESIGN AND  SUPPLY  A
 400-MW  LIGNITE-FIRED  BOILER,  ESP,  AND  FGD  SYSTEM AT  GIBBONS  CREEK STEAM
 ELECTRIC  STATION  UNIT NO.  1.  THE BOILER UILL BURN  1.06* SULFUR LIGNITE.
 FLUE  GAS  WILL  BE  CLEANED OF  PARTICULATES BY A  COLD-SIDE ESP  (99.73X
 EFFICIENCY). SOZ  WILL BE REMOVED BY 3  SPRAY TOWER  MODULES UTILIMNG  A
 LIMESTONF SLURRY  (72.5  TO  S7.5X  EFFICIENCY). A CONTRACT HAS  BEEN AWARDED
 TO  IUCS  FOR SLUDGE  DISPOSAL.  CONSTRUCTION  IS TO  BEGIN  IN THE  SPRING  OF
 1979. COCMIRICAL  START-UP  IS  SCHEDULED  FOR  JANUARY,  1982*
                                                 29

-------
fPA UTILITY »60 SUPVrVs DECtMBFk  197P  -  JANUARY  1979
                                              SECTION  ?
                                        STATUS  OF  F60  SYSTEMS
»MT IDENTIFICATION
                                                                  ABSTRACT
TtXAS POWER R LIGHT
SANDOW

N EW       545.0 MW  (GROSS )
          38?.0 MW  (FSC>
COAL
 1.60 XS  LI6NITF
LIMESTONF
COMBUSTION  EN6INEERIN6
FNERGY  CONSUMPTION :  *****
STATUS  2      STARTUP  7/PO
                                COMBUSTIIN  ENGINEERING  HAS  BEEN  CHOSEN  AS  THE  BOILER  AND  FGD VENDOR FOR
                                THIS  UNIT.  BOILER  CONSTRUCTION  BEGAN ON SFPTjMBER 9,  1977. PARTICULATE
                                REMOVAL  (OU1PMENT  WILL  PE  LOCATED ON THE COLD-SIDE  OF THE AIR HEATER.
                                SOME  PORTION  OF  THE  FLUE GAS  WILL BYPASS THE SCRUBBER FOR RFHEAT. THE
                                SPENT SH.RRY  WILL  BE  PONDED AND  WATER RECYCLED.
                                -NULL — NIL L--NULL—NUL I.--N ULL--NUL|.--NULL-~NULl--NuL L—NULL--NULL--NULL--N
TEXAS POWER
TWIN  OAKS
1
NEW
             *  L16HT
           750,0 My (GROSS)
           75P.O f«K
 COAL
 *****  XS   LIGNITE
 L IMESTONE
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION: *****
 STATUS 6      STARTUP  8/83
THIS UNIT WILL  BE  JOINTLY OWNED |V TPftL AND ALCOA.  A FIRM DECISION HAS
NOT TEEN MADE WHETHER TO INSTALL FfiD FACILITIES. THIS IS PRIMARILY [U&
TO THE F-iCT THAT SUCH A DECISION IS NOT YET REfiUIRED IN THE UTILITIES
PLANNING TIMETABLE
 TEXAS  POWER  S  LIGHT
 TWIN OAKS
 ?
 NEW       750.0 KU (GROSS)
           750.0 «M «ESe>
 COAL
 *****  XS  tIENITE
 LIMESTONE
 VENDOR NOT SELECTED
 FNERGV CONSUMPTION: *****
 STATUS 6     STARTUP  9/84
                                THIS  UNIT  WILL  BE  JOINTLY  OWNED  fiY  TPM.  AND  ALCOA.  A  FIRM  DECISION  HAS
                                NOT  EIEEN F*ADE  WHETHER  TO INSTALL FGD  FACILITIES.  THIS IS PRIMARILY  »U£
                                TO  THE  F*CT  THAT SUCH  A  DECISION IS NOT  YIT  RE8UIRID  IN  THI  UTILITIES
                                PLANNING TIMETABLE
 TEXAS  UTILITIES
 FOREST 6ROVE
 1
 NEW       750.0 "U <6ROSS>
           750,0 MH (ISC)
 COAL
 *****  XS  L1GNITI
 PROCESS NOT SELECTED
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION: ****X
 STATUS 5     STARTUP  0/M
                                TEXAS UTILITIES IS  PLANNING  A NEW 750~MU  UN]T  AT  THE  FOREST  iROVE  SITE.
                                TWO tSP'S WILL BE INSTALLED  FOA  PARTICULAR  CONTROL.  THE  UTILITY IS
                                CURRENTL1 RE8UIST1N6 KIDS FOR AN FED SYSTEM. START-UP IS  SCHEDULED FOR
                                LATi  1981. THI BOILER WILL  PE SUPPLIED  BY IABCCCK 8  WHCOX  COMPANY.
                                THE DESIGN DOES NOT INCLUDE  A STACK  BAS REHEAT SYSTEM,
 TEXAS  UTILITIES
 MARTIN MKF
 t
 NEW       793.0 MW (GROSS)
           595.0 MW (ESC)
 COAL
   .90  XS  LIGNITE
 LIMESTONE
 RESEARCH CQTTRELL
 ENIR6Y CONSUMPTION! *****
 STATUS 1     STARTUP  4/77
                                REFER TO SECTION 3 Of THIS  REPORT F,OR ADDITIONAL INFORMATION. THIS NEW
                                793 MW UMT FIRES TEXAS LIGNITE CONTAINING  Q.9X SULfUR  (AVG> AN» 8X ASH
                                (AVE). Tlif UNIT IS E6UIPPED MITH AN EMISSION CONTROL SYSTEM MHICN
                                INCLUDES COLD-SIDE FSP'S AND A LIMESTONE F6D SYSTEM BOTH SUPPLIED BY
                                RiSiARCH-COTTRiLL* THE F6D  SySTEH CONSISTS  OF 6 PACKED/SPRAY TOWER
                                ABSORBERS WHICH TREAT 7SX OF TH{ TOTAL BOILER FLUE f>A$. THE REMAINING
                                FLUE CAS IS BYPASSED FOR RtHgAT. TOTAL S02  REMOVAL EFFICIENCY IS 70.SX.
                                THE FLUE MS CLEANING WASTES ARE STABILIZED AND DISPOSED IN AN ON-SITE,
                                LANDFILL .
 TEXAS  UTILITIES
 MARTIN LAKE
 I
 NEW       793.0 MW (GROSS)
           595.0 MW (5SC)
 COAL
   .90  XS  LIGNITE
 LIMESTONE
 RESEARCH COTTRELL
 ENERGY CONSUMPTION: *****
                                REFER TO SECTION 3 OF THIS REPORT FOR ADDITIONAL INFORMATION. THIS NEW
                                793 MW UMT FIRES TEXAS LIGNITE CONTAINING G.9X SULFUR (AV6) AND SX ASH
                                (AVG). Tit  UNIT IS EQUIPPED WITH AN EMISSION CONTROL SYSTEM CONSISTING
                                OF COLD-TIDE ESP'S AND A LIMESTONE FGD SYSTEM, BOTH SUPPLIED BY
                                RESEARCH -COTTRELL. THE FGD SYSTEM CONSIST; OF 6 PACKED/SPRAY TOWER
                                APSOKBtRJ WHICH TREAT 75X OF THE TOTAL BOILER FLUE GAS. THE REMAINING
                                FLUE GAS IS BY-PASSED FOR REHEAT. TOTAL DESIGN SO? REMOVAL EFFICIENCY IS
                                70.51, TK  FLUE GAS CLEANING WASTES ARE STABILIZED AND DISPOSED IN AN
                                CN-SITE LANDFILL.
 STATUS 1
              STARTUP  5/78
                                                 30

-------
                                              EPA UTILITY  FGO  SURVEY: DECEMBER 1978 - JANUARY  1979
                                              SECTjON  2
                                         STATUS OF  FED  SYSTEMS
UNIT IDENTIFICATION
                                                                   ABSTRACT
TEXAS UTILITItS
MARTIN LAKE
7
          793.0  MW  (GROSS)
          595.0  KW  t£SC>
COAL
   .90 XS  LIGNITE
LIMESTONE
RESEARCH  COTTKELL
ENERGY  CONSUMPTION: *****
STATUS  2      STARTUP  J/79
THIS K'tU 793-MW POWER  GENERATING  UMT  HILL  FIRE TEXAS LIGNITE CONTAINING
0.9X SULFUR (AVG.) AND  BX  ASH  CAVG.).  TO MEET FEDERAL NSPSt THE
BE EtUlPFtD WITH AN EMISSION CONTROL SYSTEM CONSISTING OF COLD-SIDE ESP'S
AND A LIU STONE FGD SYSTEM,  BOTH  SUPPLIED BY RESEARCH-COTTRELL. THE F6D
SYSTEM CcNsISTS OF 6 PACKED/SPRAY TOWER  ABSORBERS WHICH WILL TREAT 75* OF
THE TOTAL BOILER FLUE  GAS.  THE  REMAINING GAS WILL BE BYPASSED FOR REHEAT.
TOTAL DE!I6N SO? REMOVAL EFFICIENCY  IS  70.5X THE FLU* GAS CLEANING
WASTES WILL BE  STABILIZED  AND  DISPOSED  IN AN ON-SITE LANDFILL.
TtXAS  UTILITIES
MARTIN LAKE
t
NEW        7SO.O  ?,* (GROSS)
           750.0  MW (FSC)
COAL
   .90  XS   LIGNITE
LIWESTONF
RESEARCH  COTTHELL
ENERGY CONSUMPTION: *****
THE CONTRACT FOR THIS  FGD  SYSTEM  HAS BEEN AWARDED TO REsEARCH-COTTRELL.
THE bOlLiR  IS NOW BEING  ERECTED.  START-UP HAS BEEN DELAYED TO EITHER
1985 OR  1986.
 STATUS 3
              STARTUP  Q/R5
 TEXAS  UTUITIiS
 MILL CREEK
 1
 NEW       750.0 MW (ftiOSS)
           750.0 MK (ESc)
 COAL
 *****  XS  LIGNITE
 PROCESS NOT SELECTED
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION: *****
 STATUS 6     STARTUP  0/85
TEXAS UTILITIES  IS  PLANNING  TWO  NEW  75Q-MW  UNITS F 0" THE UTHITY'S
MILL CRIFir  SITE.  THI  UTILITY KILL  INCORPORATE F6C  SYSTEMS ON EACH UNIT
SO THAT  502  EMISSIONS  WILL  BE CONTROLLED TO APPROXIMATELY H6/MM PTl).
PARTICULm  MATTER  WILL  B6  CONTROLLED  BY ESP'S.  START-UP FOR UNITS
1 AND2 A fF  PROJECTID TO  Bl  1985  AND  19g« »ESPE CT1VH Y.
 TEXAS UTILITIES
 MILL CREEK
 I
 NEW       750.0 MM (GROSS)
           750.0 MW (ESc)
 COAL
 ***** X$  LIGNITE
 PROCESS NOT SELECTED
 VENDOR NOT SELECTED
 ENERGY CONSUMPTION: ****%
 STATUS 6     STARTUP  0/P6
TEXAS UTILITIES  IS  PLANNING  TWO NEW 750-MW  UNITS F 0" THE UTILITY'S
MILL CREEK  SITE.  THE  UTILITY WILL  INCORPORATE FGD  SYSTEMS ON t* C« UNIT
SO THAT  502  EMISSIONS  WILL  BE CONTROLLED TO APPROXIMATELY 1 IB/MM BTU.
PART1CLIOTE  MATTER  WILL  BE  CONTROLLED  BY ESP'S.  START-UP FOR UNITS
1 AND 2  tKt  PROJECTED  TO BE  1985 AND 1986 RESPECTIVELY.
 TEXAS UTILITIES
 MONTICELLO
 5
 NEW       8CC.O MW  (GROSS)
           800.0 MW  (ESC>
 COAL
  1.50 XS  LIGNITE
 LIMESTONE
 CHEMICO
 ENERGY CONSUMPTION: ****%
 STATUS 1     STARTUP  5/78
 REFER  TO  SECTION  3  OF  THIS  REPORT FQR ADDITIONAL INFORMATION. THE
 EMISSION  CONTROL  SYSTEM  FOR THIS  UNIT CONSISTS OF A HIGH EFFICIENCY ESp
 AND  A  LIMESTONE  FGD SYSTEM. THE ESP (POLLUTION CONTROL-WALTHER) PROVIDES
 PRIMARY  FARTKULATE CONTROL 199.56X). THE F60 SYSTEM CONSISTS OF 3
 LIMESToNt  SCRUBBING SPRAY TOkFRS  THAT PROVIDE PRIMARY S02 CONTROL (742).
 THE  FED  IVSTEM  IS DESIGNED  TO TREAT 3 MM ACFM OF FLUE GAS RESULTING FROM
 COAL WIT^ 1.SX  SULFUR, 18.9X ASH  AND C.04X CL. THE FLUE GAS CLEANING
 WASTIS AfE  DISPOSED IN AN ON-SITE LINED POND.
 UTAH POWER g LIGHT
 EMERY
 1
 NEW       400.0 KU  (GROSS)
           360.0 MW  (ESC)
 COAL
   .50 XS
 LIME
 CHFftICO
 ENERGY CONSUMPTION:  *****
 STATUS 2     STARTUP «/79
 A  CONTRACT  HAS  BEEN  AWARDED TO THE CHFMICO AIR POLLUTION DIVISION FOR  A
 PEBBLE  LIKE WET SCRUBBING SYSTEM FOR THIS NEW UNIT. THE SCRUBBING SYSTEM
 IS  DESlGfcED TO  OPERATE  IN AN OPEN WATER LOOP MODE WITH AN S02 REMOVAL
 EFFICIENCY  OF  80 PERCENT FOR LOW SULFUR UTAH COAL. PRIMARY PARTICULATE
 CONTROL  MLL BE PROVIDED BY AN ESP UPSTREAM OF THE SCRUBBERS. THE SLUDGE
 WILL  BE  STABILIZED  WITH FLY«$H AND DISPOSED OF ON THE PLANT SITE. THE
 A-E  DESIGN  FIRM FOR  THIS PROJECT IS STEARNS-R06ER. CONSTRUCTION  {S  NOW
 IN  ITS  FINAL STAGES.
                                                  31

-------
    UTILITY F6D SURVEY: DECtPBF.S  197F  -  JANUARY  1979
                                              SECTION 2
                                        STATUS  OF  F6D SYSTEMS
UNIT IDENTIFICATION
                                                                  ABSTRACT
UTAH POWFR t LIGHT
FMERY

NEW       400.0 MW  (GROSS)
          360.0 M*  (F,Sc >
COAL
   .50 XS
I 1ME
CHEMICO
FNF.RGY CONSUMPTION:  ***«X
STATUS 2     STARTUP   6/PO
                                UTAH  F'H  AWARDED CHIMICO A CONTRACT TO SUPPLY A LIME FGO SYSTEM  FOR  ENERY
                                ?  OESlGNtD  TO OPERATE IN AN OPEN WATER LOOP MODE VjTH AN SO? REMOVAL EF-
                                FICIENCY  OF 60 PERCENT (FIRING LOW SULFUR UTAH COAL). PRIMARY PARTlCUtATE
                                CONTROL  ULL 8E PROVIDED BY AN ESP UP-STREAM OF THE SCRUBBERS. THE  SLUDGE
                                WILL  6f  STABILI7ED  WITH FLY*SH AND DISPOSED OF ON TH£ PLANT SITE.  INITIAL
                                TOILER AtD  F6D SYSTFM START-UP iS SCHEDULED FOR JuN* 1WO» THIS  UNIT WILL
                                ?F IDENTICAL TO UNIT 1, CONSTRUCTION ON THIS UNIT IS ABOUT 3 5X COMPLETE.
UTAH  POWCR  «.  LIGHT
MUNTIN6TON
1
NEW       430.0  PW  (GROSS)
          166.0  ru  (rse>
COAL
   .50  XS
IIWE
                                FfFfR  TO SECTION 3  OF  THIS  REPORT FOR ADDITIONAL INFORMATION. CHEffICO WAS
                                THE  SUfPHER OF A LIME SCRUPE1N6 SVSTFM FOR THIS NEW UNIT. PRIMARY
                                PARTUULm  RIWOVAL IS PROWIOFD BY AN ISP INSTALLED UPSTREAM OF THE WET
                                SCRUBBING SYSTEM. A DAMPER  IS USED DURING OPERATION TO ALLOW BETWEEN 10
                                AND  t'C PERCENT OF THE  FLUE  «AS TO PY-PASS THE FGD SYSTEM. DESIGN REMOVAL
                                EFFICIENCIES FOR SO? AND PARTiCULATI ARE 10 AND 99.5 PERCENT
                                RFSPtCTIVKLY. SLUftS! IS DEWATEREB <60!f SOLIDS) AND TRUCKED TO AN ON-SJTE
                                IAN6FILI. INITIAL OPERATIONS AT THIS UNIT SiGAN ON MAY 10* 197S.
ENERGY  CONSUMPTION:  *****
STATUS  1      STARTUP  5/7£
WISCONSIN  POWER  &  LIGHT
COLUMBIA
2
NEV        $27.0  MW  (GROSS)
           311.0  MW  (FSC>
COAL
   .80  XS
LIME/ALKALINE  FLYASH
CHEMICO
PNER6Y CONSUMPTION: *****
STATUS 3      STARTUP   1/fiO
                                A CONTRACT HAS SEEN AWARDED TO CHEMICO FOR A LlMi/FLVASH ffifi SYSTEM.  IT
                                WILL CONSIST OF TWO SPRAY MOCULES WITH A HOT-SIDE ESP FOR PARTICULAR
                                REMOVAL. A CLOSED LOOP WATER SYSTEM IS ANTICIPATED WITH FLYASH STABILI-
                                ZATION Of THE SLUDGE. A SLUDGE DISPOSAL POND LOCATED OFF-SITE IS BEING
                                CONSIDERF.0. THE FGD SYSTEM IS faFING DESIGNED TO TP-EAT 60% OF THE FLUE
                                GAS ffESUlTING FROM THE COMBUSTjON OF LOW SULFUR COLSTR1P COAL. THE
                                RFMAIKINf 40% WILL BE BYPASSED FOR REHEAT.

-------
                                             EPA  UTILITY FGO SURVEY: DECEMBER 1978 - JANUARY 1979
                                           SECTION  3
                   DESIGN  AND  PERFORMANCE  DATA  FOR OPERATIONAL FCD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
cm
STATE
REGULATORY CLASSIFICATION
PARTICIPATE  EMISSION  LIMITATION - NG/J
502 EMISSION LIMITATION  -  IHG/J
NET PLANT GENERATING  CAPACITY - MM
GROSS UNIT GENERATING CAPACITY - MU
NET UNIT GENERATING  CAPACITY U/FGD - Mb
NET UNIT GENERATING  CAPACITY WO/FGD - »W
EQUIVALENT SCRUBBED  CAPACITY - MW

** BOILER  DATA
    SUPPLIER
    TYPE
    SERVICE  LOAD
    COMMERCIAL  SERVICE DATE
    MAXIMUM  GO HER FLUE  GAS FLOW - CD.MS
    FLUE  GAS TEMPERATURE - C
    STACK  HEIGHT  - M
    STACK  TOP  DIAMETER - M

**  FUEL DATA
     FUEL  TYPi
     FUEL  GRADE
     AVERAGE  HEAT  CONTENT - KJ/KG
     8ANGE  HEAT  CONTENT - BTU/LB
     AVERAGE  ASH CONTENT  - X
     RANGE  ASH CONTENT - X
     AVERAGE  MOISTURE CONTEkT  - X
     RANGE  MOISTURE CONTENT -  X
     AVERAGE  SULFUR CONTENT -  8
     RANGE SULFUR  CONTENT - X
     AVERAGE  CHLORIDE CONTENT  - %
     RANGE CHLORIDE CONTENT -  X
     FUEL FIRING RATE - M T/H
     FUEL FIRING RATE - PIH

 ** ESP
     NUMBER
     TYPE
     SUPPLIER
     PARTICIPATE DESIGN REMOVAL EFFK1EKY

 ** F6D SYSTEM
     SALEABLE PRODUCT/THROW *UAY PRODUCT
     GENERAL PROCESS  TYPE
     PROCESS TYPE
     SYSTEM  SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     PARTICULATE DESIGN REMOVAL EFFICIENCY
     S02 DESlbK REMOVAL  EFFICIENCY -  X
     INITIAL START-UP
     CONTRACT AWARDED

 ** ABSORBER
     NUMBER
     TYPE
     INITIAL START UP
     SHELL MATERIAL
     SHELL LINER MATERIAL
     INTERNAL MATERIAL
     BOILER  LOAD/ABSORBER  -  X
     LIQUID  RECIRCtlLATION  RATE -  LITER/S
     L/G RATIO  - L/CU.M
     S02 DESIGN REMOVAL  EFFICIENCY - X

 ** FANS
     NUMBER
     TYPE
     CONSTRUCTION  MATERIALS
ALABAMA ELECTRIC COOP
TOWBIGBEE
2
LEROY
ALABAMA
A
***** *
  516.
*******
  ?S5.0
  225.0
*******
  179.0
    RILEV  STOKER
    PULVERIZED
    BASE
     6/79
      4*9.72
      HJ.9
      12J.
    *******
                    (****** LB/KMiTU>
                    (  1.200 LB/FMBTU)
    COAL
    BITUMINOUS
    *******

    ********
    10-1*
    ********
    ******
         1.15
    0.8-1.5
    ********
    ******
    *******
    *****
                (  953000 »CFM>
                (  291  F)
                (  400  FT)
                (*«***  FT)
                (****** BTU/LB)
                 11000-12000
                (***  TPH>
     HOT SIDE
     RESEARCH-COTTRELL
  X     99.3
     THROW AW AY  PRODUCT
     WET SCRUBBING
     LIMESTONE
     PEABODV PROCESS SYSTEMS
     BURNS S MCDONALD
     FULL SCALE
     NEW
- X     99.3Q
        59.50
      9/78
      8/75
     SIEVE TRAY SPRAY TOWER
      9/78
     CARBON STEEL
     316L SS
     316 SS
        35.0
      1259.         (19980
         9.4        ( 70.0 GAL/1000ACF)
        85.0
      1
     ID. DIRECT  COUPLED
     CARBON STEEL
                                                 33

-------
   UTILITY  F6D  SURVEY:  DECEMBER 1978  -  JANUAPY  1979
                                            SECTION  3
                    DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL FED SYSTEMS
•* MIST ELIMINATOR
NUMBER
TYPF
** PUMPS
SERVICE
RECYCLE
MILL RECYCLE
LIMfSTONt SLURRY
WASH WATER
WASTE SLURRY
SUPERNATE RETURN
** TANKS
SERVICE
SLURRY FitcYCLE
LIMESTONE SLURRY STORAGE
WASHWATFR
** REHEATER
NUMBER
*• THICKENER
NUMBER
1
CHEVRON
NUMBFR
6
2
2
3
2
1
NUMBER
1
1
1
1
1
 ** WATER LOOP
     TYpE                                        OPEN
     FRESH MAKEUP  WATER  ADDITION - Lims/s        U.6

 *• REA6ENT PREPARATION  EQUIPMENT
     NUMBER OF  BALL MILLS                            1
     BALL MILL  CAPACITY- M T/H                      9.1

 *• TREATMENT

 ** DISPOSAL
     NATURE                                      FINAL
     TYPE                                        LINED POND
     LOCATION                                    ON SITE
     TRANSPORTATION                              PIPE
<   280  6PM)
< 10.0 TPH)
	•-._...	.........---pERf ORMANCE DATA	^-	'•—*—-------— — --•-	;-----—..
PERIOD MODULE  AWAIIAPILITY OPERASILITY FfLlABlLITV UTILIZATION   X  REMOVAL    PER  BOILER  FGO   CAP.
                                                                  S02   PART. HOURS HOURS  HOURS  FACTOR
 8/7?  SYSTEM

 9/7R  SYSTEM
       ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    9/78     tOUIffENT:  r6D StSTEMt  GfcNERAL
              tND  DATE      9/78     COMMENTS!
                          INITIAL OPERATION BEGAN DURING  SEPTEMBER.
              AFFECTED  MODULES: SYSTEM
10/78  SYSTEM

11/76  SYSTEM

12/78  SYSTEM
              744

              720
               744

               720

               744
          PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE  12/78     E6DIFWENT:  FGO  SYSTEM,  GENERAL
              tND  DATE      1/79     CCMHtNTS:
                          THE UTILITY HA! REPORTED  THAT  THE UNIT HAS SUFFERED NO MAJOR  PROBLEMS.
                           OPERATIONAL HCURS ARE NOW  BEING  ACCUMULATED.
              AFFECTED  MODULES: SYS*
 1/79  SYSTEM
                                                                                744

-------
                                           SPA umm F«6 SURVEY: DECEMBER 1978 - JANUARY 1979
                                         SECTION 3
                  DESIGN AND PERFORMANCE DATA FOR OPERATIONAL F60 SYSTFMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATl
REGULATORY CLASSIFICATION
PART1CULATE EMISSION LIMITATION - hG/J
S02 EMISSION LIMITATION -  MS/J
NET PLANT GENERATING CAPACITY  - MW
GROSS UNIT GENERATING CAPACITY - MM
NET UNIT GENERATING CAPACITY W/FGD - Mfe
NET UNIT GENERATING CAPACITY NO/FGC *  f>W
ECU1VALFNT SCRUBBED CAPACITY - I«IW

** BOILER DATA
    SUPPLIER
    TYPI
    SERVICE LOAD
    COMMERCIAL  SERVICE  DATE
    MAXIMUM BOILER  FLUE GAS  FLOW - CU.*/S
    FLUE GAS TEMPERATURE  - C
    STACK HEIGHT  -  M
    STACK TOP  DIAMETER  -  M

**  FUEL  DATA
     FUEL TYPE
     FUEL GRADE
    AVERAGE HEAT  CONTENT  - KJ/KG
    RANGE HEAT  CONTENT  -  EtlU/Lt>
     AVERAGE ASH CONTENT - 3
     RANGE  ASH  CONTENT  - X
     AVERAGE MOISTURE CONTENT - X
     RANGE  MOISTURE  CONTENT - X
     AVERAGE SULFUR  CONTENT - X
     RANGE  SULFUR  CONTENT  -
     AVERAGE CHLORIDE CONTEKT
     RANGE  CHLORICr  CONTENT - X
     FUEL  FIRING RATE -  M  T/H
     FUEL  FIRING RATE -  MU

 ** ISP
                             -  X
    TYPE
    SUPPLIER
    PARTICULAR DESIGN  REPCVAl, EFFICIENCY

*« F60 SYSTEM
    SALEAILE  PRODUCT/THROWmV PRODUCT
    GENFRAL PROCESS TYPE
    PROCESS TYPE
    SYSTEM SUPPLIER
    A-E FIRM
    DEVELOPMENT LEVEL
    NEW/RETROFIT
    PARTICULAR DESIGN  REMCVAL EFFKIEKCY
    S02 DESIGN REMOVAL  EFFICIENCY - t
    COMMERCIAL DATE
    INITIAL START-UP
    CONSTRUCTION COHPliTlOIH

*« ABSOPBIK
                                                               POWER COOP
                                                             <  .100 LP/MMBTU)
                                                             <  .BCD IB/MMBTU)
ARIZONA
APACHE

COCHISE
ARIZONA
6
   43.
  344.
 • 590.0
  245.0
  ?DO.O
*******
  180.0
                                              RUEV STOKER
                                              PULVERIZED COAL.CRT BOTTOM
                                              BASE
                                               0/78
                                              ********       (*******
                                              *******        <»**» f)
                                                12?.         < 400 FT)
                                              *******        (****» FT)
    TYPI
    INITIAL START UP
    NUHKER OF STAGES
    SHELL MATERIAL
    SHELL LINER MATERIAL
    NOWLF TYPE
    GAS FLOU - CU.H/S
    GAS TEMPERATURE - C
    LUulD RECIRCULATION RATE - LITfRAS
    PRESSURE DROP " "PA

** MIST ELIMINATOR
    NUMBER
    TYPE
COAL
BITUMINOUS
*******

   10.00
******
********
******
     .70
0.5-0.8
********
******
*******
*****
                                                             (*«**** BTU/L8)
                                                              10000-11000
                                                             (*** TPH)
  1
HOT SIDE
AIR CORRECTION DIVISION, UOP
   99. t
 THROWAWAY  PRODUCT
 WET  SCRUBBING
 LIMESTONE
 RESEARCH COTTRELL
 iURNS  I MCDONALD
 FULL-SCALE
 NEH
   99. 50
   85.00
 11/78
  8/78
  8/7B
 PACKED  TOMER
  8/78
     1
 MILD STEEL
 GLASS-FLEX
 31«  SS
   188.76
   132.2
  1760.
      .1
                                                               ( 400000 ACFM)
                                                               (  270  F>
                                                               (20QOO  6P«>
                                                               (  .6 IN-H20)
  4
 CHEVRON
                                               35

-------
EPA UTILITY FdD SURVEY: DECEMBER  1?7f  - JANUARY 1979
                                            SECTION  3
                    DESIGN  AND  PERFORMANCE  DATA  FOR OPERATIONAL  FtD  SYSTEMS
      CONFIGURATION

 ** VATER  LOOP
      TYPE
      RECOVERED  HATER  RETURN  - LITER/S
      FRESH MAKEUP  WATER  ADDITION -  L1TEKS/S

 *• DISPOSAL
      NATURE
      TYPE
      LOCATION
      TRANSPORTATION
      DIMENSIONS
      AREA  -  ACRES
      CAPACITY  - CU.M

 *•  DISPOSAL
      NATURE
      TYPF
      LOCATION
      TRANSPORTATION
      DIMENSIONS
      AREA  -  ACRES
      CAPACITY  - CU.M
(  540D  GPU)
<  1840
                                        HORIZONTAL
                                        OPEN
                                           340.2
                                           115.9
                                         FINAL
                                         SLUDGE  POND
                                         OFF-SITE  ON  LEASED  LAND
                                         PUMPED
                                         22  ACRES  X  18  FT  DEEP
                                            22.0
                                             4843QS      <    396.0  ACRE-FT)
                                         FINAL
                                         ASH  POND
                                         OFF-SITE  ON  LEASED  LAND
                                         PUMPED
                                         64 ACRES  X  18  FT  DEEP
                                           64.0
                                           1408696      (   1152.0  ACRE-FT)
 PERIOD NODULE AVAILABILITY OPERAE1L1TY
                               	PERFORMANCE  DATA	
                                PLIABILITY UTILIZATION
 x REMOVAL
 502  PARTi
 PER  BOILER  F6D   CAP,
HOURS HOURS  HOURS FAC10R
 10/TR  SYSTEM
                                                                              744
                                                                            3D z
                                                                                                58.1
 11/78
 12/7R
** PROBLEMS/SOLUTIONS/COWMENTS
      START DATE  10/7?     ECUKrtNT:  REAGENT  HANDLING
      END DATE    11/78     PROBLEM: NOT DEFINED/SPECIFIED
                  THE LIMESTONE (RUSHER WAS UNABLE  TO MEET ITS  DESIGN CAPACITY.
      AFFECTED MODULES: SYSTEM

** PROdLEMS/SOLUTIONS/CPMMENTS
      START DATE  10/78     EBU1FMENT:  f60 SYSTEM,  GENERAL
      END DATE    11 /78     COMWCNTS:
                  A COMPLIANCE TEST HAS COMPLETED BUT THE RESULTS ARE NOT YET AVAILABLE.
                  THE ACCEPTANCE IS SCHEDULED FOR THE BEGINNING OF  1979.
      AFFECTED MODULES: SYSTEM

A                       25.0                    17.0
B                       44.0                    30.C
SYSTEM                                                                720   488         80.7


SYSTEM                                                                744   512

** PROBLEMS/SOLUTIONS/COHKENTS
      START DATE  12/78     EOUII'WENT:  RECYCLE  PUMP
      END DATE     1/79     PROBUMt NOT DEFINED/SPECIFIED
                   THE FGD SYSTEM WAS NOT IN SERVICE DURING DECEMBER OR JANUARY DUE TO
                   VARIOUS "DEBUGGING"  PROBLEMS ESPECIALLY IN MAINTAINING RECYCLE PUMP OPER-
                   ATION.
      AFFECTED MODULES: SYSTEM

•• PROBLEMS/SOLUTIONS/COMMEN1S
      START DATE  12/78     EfiUIFMENT:  F6D SYSTEM, GENERAL
      END DATE     1/79     COMMITS:
                   RESULTS OF A KCENT  COMPLIANCE TEST INDICATED THAT S02 EMISSIONS MERE
                   BETWEEN 1.2 LE/MM BTU, THE FEDERAL STANDARD, AND 0.8 LB/MM BTU, THE STATE
                   STANDARD. KIT*OUT THE F60 SYSTEM.  THE UTILITY IS CURRENTLY BURNING LOU
                   SULFER COAL (t.6X S> AND THEY BELIEVE THAT THE STATE STANDARD COULD RE MET
                   WITHOUT F6D SYSTEM OPERATION WHEN THE FURNACE IS "FINE TUNED".
      AFFECTED MODULES: SYSTEM

** PROBLEMS/SOLUTIONS/COMMENTS
      START DATE  12/78     tCUIFPENT:  PIPING
      END DATE     1/79     PRCBIFfl! COMPONENT FAILURE*  OTHER
                                                 36

-------
                                             EPA UTILITY MB SURVEY: DECEMBER 1978 - JANUARY 1979
                                           SECTION 3
                    DESIGN AND PERFORM C.C E DATA FOR OPERATIONAL FGD SYSTEMS
............	.	....	-PERFORMANCE DATA----- — - — -	
PERIOD NODULE AVAILABILITY CPERABILITY  PLIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                SO?  PART. HOURS HOURS  HOURS FACTOR

                         A 30  HOUR OUTftbE OCCURRED DUE TO A RUpTURED PIPF.
             AFFECTED MODULES:  SYSTEM

 1/79
       SYSTEW                                                                7«*   662
                                                 37

-------
'PA UTILITY FGD SURVFY: DECtUBfrR 197f  - JANUARY  1979
                                            SECTION  3
                    OtSKN  AND  PERFORMAKE  DATA  FOR OPERATIONAL  FGD  SYSTEMS
 COMPANY MAKE
 PLANT NAMF,
 UNIT NUMBER
 CITY
 STATE
 REGULATORY CLASSIFICATION
 PART1CULATE  EMISSION  LIMITATION  -  N6/J
 $02  EMISSION  LIMITATION  -  SG/J
 NFT  PLANT  6FNERATING  CAPACITY  -  MV
 GROSS UNIT GtNERATING CAPACITY - Hb
 NET  UNIT GENERATING  CAPACITY  U/FGD -  M V*
 NET  UNIT GENERATING  CAPACITY  WO/F61 - "V
 EQUIVALENT SCRUBBED  CAPACITY  - MW

 •* BOILER  DATA
      SUPPLIER
      TYPE
      SERVICE  LOAD
      COMMERCIAL  SERVICE  DATE
      MAXIMUM  UOIliR  FLUE  GAS FLOW - CU.f/S
      FLUE GAS  TEMPERATURE  - C
      STACK  HEIGHT  -  M
      STACK  TOP DIAMETER  -  M

 »*  FUEL  DATA
      FUEL TYPE
      FUEL GRADE
      AVERAGE  HEAT  CONTENT  - KJ/K6
      RANGE  HEAT  CONTENT  -  BTU/LB
      AVERAGE  ASH CONTENT  - X
      RANFE  ASH CONTENT -  X
      AVERAGE  MOISTURE  CONTENT  -  *
      RANGE  MOISTURE  CONTENT -  X
      AVERAGE  SULFUR  CONTENT -  X
      RANfE  SULFUR  CONTENT  - X
      AVERAGE  CHLORIDF.  CONTENT  » X
      RANC-f  CHLORIDE  CONTENT -  X
      FUEL  FIRING RATE  -  M  T/H
      FUEL  FIRING RATE  -  MW

 »*  MECHANICAL COLLECTOR
      TYpI
      SUPPLIER
      PARTICULATE DESIGN  PEMCVAL  EFFICIENCY

  **  PARTICULATE  sCPuBRER
      NUMBER
      TYPI
      NUMPER OF STASIS
      SHELL  MATERIAL
      LINING MATERIAL
      TYPE OF  NOZJLfS
      BOILER LOAD/SCRUSBER  - X
      FLUf SAS  CAPACITY -  CU.M/S
      FLUE GAS  TEMPERATURE  - c
      LlSUIfr RICIRCULATION  RATE -  LITEfi/S
      L/S  RATIO - LITIR/CU.M
      PRESSURE  OROP * KPA
      PARTICULATE INLET LOAD •  f'/CU.M
      PARTICULATE DESI&N  REnOVAl  EFFJCIEdCY

 **  F60  StSTEH
      SALFABLf  PRO DUCT/THROW AWAY PRODUCT
      GENERAL  PROCESS TYPE
      PROCESS  TYPE
      SYSTEM SUPPLIER
      A-E  FIRM
      DEVILOPMENT LEVEL
      NEW/RETROFIT
      PARTICULATE DESIGN  REMOVAL EFFICIENCY
      S02  DESIGN  REMOVAL  EFFICIENCY  - X
      COMMERCIAL  DATE
      INITIAL  START-UP
      CONSTRUCTION  COMPLETION
      CONTRACT  AWARDED
      STARTED  REQUESTING  BIDS
(  .1'8 LP/MMBTU)
( 1.000 LR/MMBTU)
   ARIZONA  PUBLIC  SERVICE
   CHOLLA
   1
   JOSEPH  CITY
   ARIZONA
   B
      85.
     430.
     615.0
     119.0
     115.0
     120.0
     119,0
   COMBUSTION ENGINEERING
   PULVERIZED COAL. WET  BOTTOM
   BASE
    0/62
     74S.39       ( SZOOOO  ACFIO
   *******         (****  F)
      It.          t 256  FT)
   *******         (**«**  FT)
   COAL
   SUSmUMINObS
    23609.
   9.7-?2.5
      15.00
   ******
        .SO
   O.U-1.0
        .02
   0.01-0.04
      49.0
     119
( 10150
 9650-106DO
< 54 TPH)
   CYCLONES
   RESEARCH COTTRELL
X     7S.Q
   FLOODED DISC
       1
   316L SS
   CIILCOTE AND FLAKE6LJSS 
     156.7           271 F)
     136.7          2170 GPM)
       1.4         10.1 6AL/1000ACF)
       3.7            1! IN-H20)
       4.6           2.(!Q 6P/SCF)
      99.2
   THROWAWAY PRODUCT
   WET SCRUBBING
   LIMESTONE
   RESEARCH COTTRELL
   E9ASCO
   FULL-SCALE
   RETROFIT
      99.70
      58.50
   12/73
   10/73
   12/73
    7/71
    */71
                                                 38

-------
                                             EPA  UTILITY FGD SURVEY: DECEMBER 1978 - JANUARY 1979
                                           SECTION  3
                   DF.S16N  AND  PFRFCRKAKCE  DATA  FOR OPERATIONAL F6D SYSTEMS
    STARTED PRELIMINAY DESIGN

** ABSORBER
    NUMBER
    TYPF
    INITIAL START UP
    SUPPLIED
    NUMBER OF STAGES
    DIMENSIONS
    SHELL MATERIAL
    INTERNAL MATERIAL
    N01ZLF TYPE
    BOILER LOAO/APSORBER  .  J
    6AS FLOW - CU.M/S
    GAS TEMPERATURE  -  C
    LIOUID RECIRCULATION  RATE  - LITEfl/S
    L/6 RATIO -  L/CU.M
    PRESSURE DROP -  KPA
    SUPfRFKAL CAS VELOCITY -  K/SEC
    PARTICULATE  INLET  LOAD  -  G/CU.K
    PARTICULAR  OUTLET LOAD-  6/CU.M
    PARTICULATE  REMOVAL  EFFICIENCY - *
    S02 INLET CONCENTRATION -  PPM
    S02 OUTLET CONTRAT10N - PPM
    S02 DESIGN REMOVAL EFFICIENCY - X

 **  ABSORBER
    MUMPER
    TYPE
    INITIAL  START UP
    SUPPLIER
    NUMBER  OF STAGES
    DIMENSIONS
    SHELL MATERIAL
    INTERNAL MATERIAL
    NOZZLE  TYPE
    BOILER  LOAD/ABSORBER  - K
    6AS  FLOW - CU.M/S
    GAS  TEMPERATURE  -  C
    LIQUID  RECIRCULATION  RATE - LITER/!!
    L/fi  RATIO  -  L/CU.M
    PRESSURE  DROP  - KPA
     SUPERFICAL GAS  VELOCITY - K/SEC
    PARTItULATE  1NLFT  LOAD - 6/CU.f,
     PARTICULATE  OUTLET LOAD- C/CU.H
     $02  INLET  CONCENTRAT10K - PPM
     S02  OUTLET CONTRATlON  - P.PK
     soz  OESI&N  REMOVAL EFFICIENCY - %
 1/71
PACKED TOWER
10/73
RESEARCH COTTRELL
    1
22 DIA X 7(1 HIGH
3UL SS
316L SS
SPINNER VANE
   50.0
  113.26
  135.6
( 240000  ACFM)
<  276  F)
(10000  SPI")
( 49.0  GAL/1000ACF)
<  .5 IN-H20)
C  6.9  FT/S)
( 1.995 6R/SCF)
(  .001 GR/SCF)
  630.
    6.6
     .1
     .0
   99.7
  42C
  515
   25.0
 1
HOLLOW TOWFR
10/73
RESEARCH COTTRELL
    1
22 DIA X 70 HIGH
31«L SS
316L SS
SPINNER VANE
   sn.o
  113.26        ( 24DOOO ACFM)
  135.6         (  276 F>
  «30.          (10000 GPM>
    6.6         ( 49.0 6AL/1000ACF)
     .1         (  .5 IN-H20)
    2.1         (  6.9 FT/S)
    4.6
      .0
   (20
   35
   92.0
( 1.995 6P/SCF)
(  .001 GR/SCF)
 ** FANS
     NUMBER
     TYPE
     CONSTRUCTION MATERIALS

 ** FANS
     NUMBER
     TYPF
     CONSTRUCTION MATERIALS

 ** MIST ELIMINATOR
     NUMBER
     TYPE
     CONSTRUCTION MATERIAL
     CONFIGURATION
     NUMBER OF STAGES
     NUMBER OF PASSES
     FREEBOARD DISTANCE - M
     DEPTH . M
     VANE SPACING - CM
     VANE ANGLES
     WASH SYSTEM
     PRESSURE DROP - KPA
  2
 I.D.
 MILD  STEEL
  2
 I.D.
 MILD  STEEL
 CHEVRON
 POLYPROPYLENE
 HORIZONTAL
     2
     2
     4.11        (13.5  FT)
      .30        ( 1.0  FT)
     3.8         ( 1.50 IN)
 45  DEG.
 INTERMITTENT OVERSPRAY
      .1         (  .5  IN-H20)
                                                 39

-------
F.PA UTILITY  FSB  SUPVFY: DECEMBER 197F  -  JANUARY 1979
                                             SECTION 3
                     DESIGN AND PERFORMANCE  DATA FOR OPERATIONAL F6D SYSTFHS
  •*  HIST  El IM1NATOR
      MUMPER
      TYPF
      CONSTRUCTION MATERIAL
      CONfI6URATION
      NUNF/ER  OF STAGES
      NUMPER  Of PASSES
      fSEEBOARD DISTANCE -  f
      DEPTH . M
      VANE  SPACING - CM
      VANF  AMSLES
      WASH  SYSTEM
      PRESSURE DROP - KPA

  **  PROCfSS  CONTROL CHEMISTRY
      CONTROL MANNER

  **  PUMPS
      SERVICE
      RECIRCULATION

  ** TANKS
      SERVICE
      FLOODED DISC SCRUBBER  TANK
      SLUD6E HOLDUP TANK
      ABSORBER TOWER HOLDUP  TANK
      LIMESTONE SLURRY MAKEUF  TANK

  ** REHEAJER
      NURE>ER
      TYPE
      HEATING KEDIUr
      TEMPERATURE BOOST  -  C
      ENERGY REQUIRED

  ** WATER LOOP
      TYPE
      FRESH MAKEUP WATER ADDITION - LITEKS/S

  ** REAGENT PREPARATION F.OU IP« E«T
      NUMBER OF BALL MILLS

  ** DISPOSAL
      NATURE
      TYPE
      TRANSPORTATION
      DIMENSIONS
      AREA - ACRES
      CAPACITY - CO.M
SLAT IMPINGEMENT
POLYPROPYLENE
HORI70NTAL,
    7
    4
    «.11        (13.5  FT)
     .30        <  1.0  FT)
   1S.O         (  7.in  IN)
45 DEC.
INTERMITTENT OVERSPRAY
     .1         (   .5  IN-N20)
MANUAL


NUMBER

   1
IN-LINE
STEAM
   22.?
8MM ETU/HR
40 F)
OPEN
    7.6         <  120 6Pf)


    1
FINA1
UNLINED  PONG
PIPE
70-100  ACRES  X  6 FT DEEP
    85.0
    6H3730      <
                    510.0 ACRF-FT)
 	PERFORMANCE  DATA	
 PERIOD MODULE AVAILABILITY  CPERABILITY PLIABILITY UTILIZATION
                                                                   X  REMOVAL   PER  BOiLER   FGD    CAP.
                                                                   SQ2  PART. HOURS HOURS  HOURS  FACTOR
 10/73  SYSTEM

 11/73  SYSTEM

 12/73  SYSTEM
                              744

                              7ZO

                              744
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   12/73     EOUIFKENT: REHEATER
              END DATE      4/74     PROBLEM: DESIGN-RELATED  VIBRATION
                            BECAUSE OF A DIFFERENCE  IN  THE  SIZE  OF THE MAIN DUCT  AND  REHEATED TRANS-
                           ITION DUCT, THE GAS FLOU  PRODUCES  HARMONIC VIBRATIONS  IN THE  REHEATER.
                           THE VIBRATIONS WERE PARTIALLY  DAMPENED BY INSTALLATION OF  BAFFLES.
              AFFECTED  MODULES: SYSTEM
                                                  40

-------
                                              EPA UTILITY FGO SURVEY:  DECEMBER  1978  - JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL FGD SYSTEMS
-.	.	.	PERFORMANCE DATA	
PERIOD HOOULE AVAILABILITY OPERAB1LITY IELIABILITY UTILIZATION
                                                                 X  REMOVAL    PER   BOILER   FGD   CAP.
                                                                 S02   PART.  HOURS  HOURS   HOURS  FACTOR
       ** PROBLEMS/SOLU1IONS/COMMENTS
              START  DATE   12/73     EQUIPMENT: REHEATER
              END  DATE      4/74     PHOBIEM: CHEMICAL-RELATED CORROSION
                           ONE OF THE REl-EATER BUNDLES WAS  BADLY  CORRODED  BY  ACID  THAT  CONDENSED IN
                           THE UNINSULATED DUCT UPSTREAM OF  THE  REHEATERS.  THE  TUBE  BUNDLE  MAS  RE-
                          PLACED AND A BAFFLE WAS INSTALLED  TO DIVERT  CONDENSED  ACID  FROM  REHEATER
                           TLBES.
              AFFECTED  MODULES: B

       ** P80BLEMS/SOLUTIONS/COMMENTS
              START  DATE   12/73     EQUIPMENT: DUCTWORK
              END  DATE      4/74     COKMtNT: PREVENTIVE MAINTENANCE
                          THE DUCT UPSTREAM OF THE REHEATER  kAS  INSULATED.  THE  ACID  CONDENSATION
                          OCCURRED ONLY  IN THE B-NODULE WHICH CONTAINS NO  INTERNAL  PACKING  AND  THERE
                           FCRE HAS A LOfcER DEGREE OF  SULFUR DIOXIDE REMOVAL  (25 PERCENT).
              AFFECTED  MODULES: B

       **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   12/73     E6UIFWENT: PIPING
              END  DATE      4/74     PRCBlFM: CHEMICAL-RELATED PLUGGING
                           SCME LINES PUGGED, PARTICULARLY  WHEN  THE SYSTEM OPERATED  AT LOU  FLOW
                           RATES.
              AFFECTED  MODULES: SYSTEM

       *«  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   12/73     tGUIWENT: RECYCLE PUMP
              END  DATE      4/74     PROBIFM: CHEMICAL-RELATED PLUGGING
                           SCLIDS SETTLES OUT IN STANDBY PUMPS,  AND  EXCESSIVE  FAN  VIBRATIONS OCCURRED
                           BECAUSE Of ACCUMULATION OF  SCALE  BUILDUP  WHEN THE  UNIT  WAS IDLE.  TO  SOLVE
                           THESE PROBLEM: THE PACKING  GLAND  POSITION WAS REVERSED  (INSTALLED UPSIDE
                           DCWN). THE FAH WAS SANDBLASTED.  THE PIPING  WAS  HOD1FIED  TO ELIMINATE  STAG-
                           NANT POCKETS. AND PUMPS WERE FLUSHED  IMMEDIATELY AFTER  REMOVAL  FROM
                           SERVICE.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  12/73     £6UIFWENT: RECYCLE PU«P
              END DATE    **/**     PROBtER: CHEMICAL-RELATED PLUGGING
                          THE  UTILITY £ X FFfilENC E« SOLIDS BUILDUP  IN  THE  FDS STDF FINS  GLAND" BO*  AND
                          ON  TOP OF THt  SPRAY DOME.
              AFFECTED MODULES:  SYSTEM
  1/7*
        A
        B
        SYSTEM
  2/74  A
        B

        SYSTEM

  3/74  B
        A
        SYSTEM
  4/74
  5/74  A
        B
        SYSTEM

  6/74  A
        B
        SYSTEM
                                 58.0
 97.0
 90.0
 94.0

100.0
 94.0

 97.0

 66.0
100.0
 63.0

 46.0
 57.0
 62.0
 99.0
 99.0

100.0
100.0
100.0
744
672
744
                                                                               720
744
720
      744
                                                  41

-------
EPA UTILITY  F6D SUPVEY: DECEMBER  197P - JANUARY 1979
                                             SECTION  3
                     DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL FGO  SYSTEMS
	PERFORMANCE  DATA	
PERIOD  MODULE AVAILABILITY  CPERARIHTY ^LIABILITY  UTILIZATION  t REMOVAL    PER  BOILER   F60   CAP.
                                                                   S02   PART.  HOURS HOURS   HOURS  FACTOR
7/74


A
fi
SYSTEM
97.0
92 .0
95.0


744
  8/74
  9/74
 10/74
 11/74
 12/74
  1/75
  Z/75


  3/75

  4/75


  5/75
A
B
SYSTEM

B
A
SYSTEM
        B
        SYSTfcP
97.0
97.0
97.0

99.0
95.0
97.0

8;.o
68. 0
76.0
                                                                                 744
                                                                                 720
                                                                         744
** PROBLEMS/SOLUTIONS/COMflENTS
       START  DATE   10/74     E6UIF«ENT:  F6D  SYSTEM, GENERAL
       END  DATE     10/74     COMMENTS:
                    ANNUAL BOILtP  AND F6D SYSTEM OVERHAUL.
       AFFECTED  MODULES: SYSTEM

A                                    100.0
B                                     98.0
SYSTEM                                99.0

A                                    100.0
B
SYSTEM                               100.0

B                                     99.Q
A                                     98.0
SYSTEM

** PROdLEMS/SOLUTIONS/COMMENTS
                                                                                 720
                                                                                 744
                                                                                 744
               START  DATE   0/75     EQUIPMENT:  FGD  SYSTEM, GENERAL
               EN6  DATE     0/76     COMMENTS:
                            OPERATION OF  iHE  SYSTEM  THROUGHOUT 1975  AND  1976 WAS ACCOMPANIED  BY A NUM-
                            BER fiF MINOR  SR06LEI" AREAS INCLUDIN6: SI6NI FICANT C ORHOSI ON ATTACK IN THE
                            VESSEL WALLS  f.f  THE  VENTURI FLOODED-DISC  PARTICULATE SCRUBBER  MODULE; ACID
                            CORROSION IN  1HE  B-SIDE  REHEATER HOUSING;  SCALE  BUILDUP IN THE PIPE OUTLET
                            AT THE SLUD6EJFLYASH EVAPORATION FOND;  PLUGGING  IN THE SCRUBBER TOWER PACK
                            IkG «ND MIST  LtlMINATOR; EPflSlON IN  THE  PUMPS;  CORROSION IN THE BOILER EX-
                            HAUST ELPOH Of  THE  DUCTUORK LEADING  FROM  THE SfRUBBERS TO THE  STACK.
               AFFECTED MODULES; SYSTEK
A
B
SYSTEM

SYSTEM

A
B
SYSTEM

A
B
SYSTEM
96.0
99.0
98.0
88.0
65.0
77.0

48.Q
40.0
44.0
67Z

744



720


744
        ** PROdLEMS/SOLUTIONS/COMMENTE
               START  DATE   5/75      E8UK«ENT: FGD SYSTEM,  GENERAL
               £ND  DATE      5/75      COMMtNTS:
                            BOTH MODULES  tERE OFF LINE FOR HOST  OF THE MONTH FOR  SCHEDULED REPAIRS  AND
                            CLEANING.
               AFFECTED  MODULES: A

-------
                                               EPA  UTILITY FC6 SUfcVEY:  DECEMBER  1978 - JANUARY 1979
                                             SECTION J
                     DESIGN AND PERFORMANCE  DATA FOR OPERATICNAL F6D SYSTEMS
	PERFORMANCE DATA	•	
PERIOD MODULE  AVA11ABIL1TY OPEPAPUnV  «LIAB1 LIT Y UTILIZATION  X REMOVAL    PEP.   BOILER  F60   CAP.
                                                                  S02   PART.  HOURS HOURS  HOURS FACTOR


 *'75  A                                    100.0
       &                                    100 .0
       SYSTEM                               100.0                               720

       **  PROBLEMS/SOLUTIONS/COMMENTS
              START OATE   6/75      EQUIPMENT:  ABSORBER
              END DATE     6/75      PROBtF:M: CHEMICAL-RELATED PLUGGING
                           PLUGGING  IN  TfF  A-SIOE ABSORBER PACKING HAS OBSERVED.
              AFFECTED MODULES:  A

       **  PR06LEMS/SOLUTIONS/COMMENTS
              START DATE   6/75      EQUIPMENT;  HIST ELIMINATOR
              END DATF     6/75      PROBlEH: CHEMICAL-RELATED PLUGGING
                           PLUGGING  OCCURRED IN  MIST ELIMINATORS.
              AFFfCTEO MODULES:  A

        *•  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/75      tCUIFMENT:  F6D SYSTEM, GENERAL
              END DATE     6/75      COMHFNTSi
                           NC  MAJOR  PFOBUMS WERE ENCOUNTERED DURING THE  PERIOD.
              AFFECTED MODULES:  SYSTEM

  7/75  A                                    97.0
        B                                    98.0
        SYSTEM                               98.0                               744

        **  PR00LEWS/SOLUTIONS/COMMENTS
              START DATE   7/75      ICUIFWENT:  SCRUBBER
              £No DATE     7/75      PfOPLFfl: DESIGN-RELATED  FLOW DISTRIBUTION
                           MODULES UtRL 1HUT DOWN TO CLEAN FLOW RESTRICTIONS IN FLOODED-DISC REC1R-
                           CbLATION  LINES.
              AFFECTED MODULES:  SYSTEM

  8/75  A                                    95.0
        B                                   100.0
        SYSTEM                               98.0                               7*4

        *+ PROBLEMS/SOLUTIOftlS/COMMENlS
              START DATE   8/75      E6UI f«tNT: FGD SYSTEM, GENERAL
              END OATE     6/75      CCHRtNT: PREVENTIVE  MAINTENANCE
                            THE A-SIDE WA !.  SHUT DOWN FOR  INSPECTION.
              AFFECTED MODULES:  A

  9/75  A                                    98.C
        B                                    97.0
        SYSTEM                               98.0                               720

        ** PROBLEMS/SOLUTIONS/COMKENTS
              START DATE    9/75      ESUIM*ENT: SCRUBBER
              END  DATE      9/75      PROBIEM: CHEMICAL-RELATED PLUGGING
                            MINOR OUTAGE (.fSULTED FROM  PLUGSED FDS  RECIRCUL ATION LINES
              AFFECTED MODULES:  SYSTEM

 10/75  A                                    84.0
        B                                    55.0
        SYSTEM                               70.0                               744

        •* PROULEMS/SOLUTIONS/COMMENTS
              START DATE   10/75      EfiUI^ENTs  F6D SYSTEM, GENERAL
               f«D  DATf     10/75      COMMtNT: PREVENTIVE  MAINTENANCE  SCHEDULED UNIT OUTA6E
                           OUTAGES RESULTED FROM  SCHEDULED  ESljIPMENT  OVERHAULS AND RECOATIN6  OF VES-
                            SELS.
              AFFECTED MODULES:  SYSTEM

 11/75  A                                   100.0

-------
EPA UTILITY fGO SURVEY:  DECEMBER  197f  -  JANUARY 1979
                                            StCTION 3
                     DESIGN  AND  PERFORMANCE  (ATA FOR OPERATIONAL FGD SYSTEMS
------ ._ -------------- ............... ----- PERFORMANCE 6 AT A-------- - - - .............. ---- .........
PE»IOO  MODULE  AVAILABILITY CPERAP1L1TY  ftLIAPUITV UTILIZATION  X REMOVAL   PER  BOILER  F«D   CAP.
                                                                 $02.  PART. HOURS HOURS  HOURS  FACTOR

        B                                    80. 0
        SYSTEM                               90.0                              720

        **  PROULEMS/SOLUTIONS/CCMMENTS
              START  DATE  11/75     tfilllFMENT:  F6D SYSTEM, GENERAL
              £N6 BATE     11/75     COMMENTS:
                           NC N^JOR OUTAGES OR  PROBLEMS OCCURRED DURING THE REPORT PERIOD.
              AFFECTED  MODULES: SYSTEK

12/75   A                                   100.0
        6                                   100.0
        SYSTEM                              100.0                              744

        *»  PROBLEMS/SOLUTIONS/CCMMENTS
              START  DATE  12/75     EOUIIMENT:  RECYCLE PUMP
              END DATE     12/75     PUOBttM: MECHANICAL-RELATED COMPONENT INEFFICIENCY
                           MINOR PROBLEMS ENCOUNTERED INCLUDED RECYCLE PUMP REBUILDING.
              AFFECTED  MODULES: SYSTEM

        **  PROHLEMS/SOLUTIONS/CCMMENT8
              START  DATE  12/75     fcOUUCEMT:  REAGENT HANDLING
              END DATE    12/75     f-ftOBLFM: NOT DE FINED /SPECl FI ED
                           ThE P-SIDE REIFATER  COIL MALFUNCTIONED.
              AFFECTED MODULES! t

  1/76   A                                   99.0
        B                                   99.0
        SYSTEM                               99.0                              7 A 4

        **  PROBLEMS/&OLUT10NS/CCMMENTS
              START  DATE   1/76     lOUIPMENTJ  VALVES
              6ND DATE     1/76     PROBLEM; CHEMICAL-RELATED PLUGGING
                           MINOR VALVE PLUGGING OCCURRED.
              AFFECTED MODULES! SYSTCM

        *«  PR06LEMS/SOLUTION5/COrMENT5
              START  DATE   1/76     EQUIPMENT:  PIPING
              END DATE     1 lib
                           MINOR LINi PLIG6IN6 OCCURRED.
              AFFItTIS
        •* PROBLEMS/SOLUTIONSSCOMMENTS
              START (ATE   1/76     [CUlfrENT: FGD SYSTEM,
              END DATE     1 /76     COMMENTS:
                           MCDULE B OPERATING HOURS WERE LOVER BECAUSE OF REDUCED SYSTEM REOUIKFMENTS
              AFFECTED MODULES: SYSTEM

  2/76  SYSTEM                                                                696

  3/76  SYSTEM                                                                7*4

  4/76  B                                   98. 0
        SYSTEM                              99.0                              720

        «* PRUBLEMS/SOLUTIONS/CCMMENTS
              START DATE   4/76     tGUIFMENT: DUCTWORK
              END DATE     4/76     PROfUFM: DESIGN-RELATED  INFERIOR CONSTRUCTION MATERIAL
                           THE  FGD SYSTEf  IS CURRENTLY E XPfcRIENCEINS COATING  FAILURES  IN THE  ELGOU OF
                           THE  SCRUBBER  EXHAUST DUCT.
              AFFECTED. MODULES: SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   4/76     EQUIPMENT: REAGENT HANDLING
              END DATE     *'?6     PR061FM: NOT DEFINED/SPECIFIED
                           THE  UTILITY PtRfORMED SQME MINOR  REPAIRS TO THE  HOUSING  OF  THE  B-SIDF
                           REHEATER.
              AFFECTED MODULES: B
                                                 44

-------
                                              EPA  UTILITY  FGD  SURVEY:  DECEMBER  1976  -  JANUARY  1«79
                                            SECTION  3
                    DESIGN AND  PERFORMS  DATA FOR OPERATIONAL  F6D  SYSTEMS
......_...___..___—............._........PERjORHAN(f
PERIOD MODULE AVAILABILITY  OPERABILITY  RELIABILITY  UTILIZATION   x  REMOVAL    PER   BOILER   FGO    CAP'.
                                                                 SC2   PART.  HOURS  HOURS   HOURS  FACTOR
«••"•"•••" •"•" «™ • «•«•«••»••••• —  •»•*••.*••»••.••»«*  *•.«•. • <* W ••*.«•  *l» • *•••«• V «••>•.  »••*••  *»•>«•*.«•  *>•.••••>  • •*.<*..*„  «,»••>«  • «•«•••••

 5/76  A                                    76.0
       B                                   100.0
       SYSTEM                               86.0                               74*

       ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    5/76      E6UIFMINT:  REHEATFR
              END  DATE      5/76      PROBITM: CHEMICAL-RELATED CORROSION
                         THE  A-SlOE EXPERIENCED  SOME  CORROSION  AND PLUGGING PROBLEMS  IN  THE REHEAT-
                         ER TUBES.
              AFFECTED  MODULES:  A

       •* PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    5/76      tGUlMENT:  PUMP, OTHER
              END  DATE      5/76      PROBiM: NOT  DEFINED/SPECIFIED
                           THE UTILITY  RIPORTED PLUG61N6  IN  foS  LjNES.
              AFFECTED  MODULES:  SYSTfKi  SYSTEM

       ** PROBLins/SOLUTIONS/COMMENTS
              START  DATE    5/76      tQUlFfENT:  SCRUBBER
              END  DATE      5/76      PPOBlEM: CHEHICAL-RiLATSV PUOS6IN6
                           PLUGGING  OCCURRED IN THE  FDS  PACKING-
              »f?ICTED  HODULES:  SYSTEM

        •* PHObLEMS/SOUUTlONS/CCrWENTS
              START  DATE    5/76      fc«UirwENT:  MIST  ELIMINATOR
              END  DATE      5/76      PROBif*: CHEMICAL-RELATED PLUGGING
                           PLUG6IN6  OCCUhfiED IN THE  HIST  ELIMINATORS.
              AFFECTED  MODULES:  SYSTiM

  6/76  A                                   64.0
        B                                   39.0
        SVSTEK                              52.0                               720

        ** PR08LEMS/SOLUTIONS/COMMENTS
              START  DATE    6/76     iOUItPENT:  F60  SYSTEHt  GENERAL
              END  DATE      6/76      CCnlMNTi PREVENTIVE  MAINTENANCE SCHEDULED UNIT OUTAGE
                           LOW RELIABILITY FACTORS  FOR THE  MONTH OF JUNE RESULTED  FROM A  SCHEDULED
                           MID-YEAR  SCRU^ER SHUTDOWN FOR MAINTENANCE, INSPECTION  AND  REPAIRS.
              AFFECT-ED  WODULESr SYSTEM

        «* PROBLEMS/SOLUTIONS/CnHMENTS
              START  DATE    6/76     EQUIPMENT:  RECYCLE TANK
              END  DATE      6/76     PROSUM: C HEMI CAL-RELATE C CORROSION
                           SOME SCALING /NO CORROSION PROBLEMS U ER E UNCOVERED IN  THF SYSTEM'S  RFCYCIE
                           TANKS.
              AFFECTED  MODULES: SYSTEM

  7/76  A                                  100.0
        B                                   98.0
        SYSTEM                              W»0                              7*4

        ** PROBLEHS/SOLUTIONS/COMMENTS
              START  DATE    7/76     EOUIfHENT:  SCRUBBER
              END  DATE      8/76     COMMENTS:
                           REPAIRS TO THE COATING IN THE ELBOM OF THE SCRUBBER EXHAUST DUCT HERE COM-
                           PLETED.
              AFFECTED  MODULES: SYSTEM

        •*  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    7/76     EBUIFKENT:  MIST ELIMINATOR
              END  DATE      9/76     PROBLEM! MECHANICAL-RELATED COMPONENT FAILURE
                           A  MALFUNCTIONING SOLENOID VAtVE IN THE MIST ELIMINATOR WASH SYSTEM OF THE
                           P-SIDE, PREVENTING  ADEQUATE WASHING, RESULTED IN A MINOR  SCRUBBER OUTAGE*
              AFFECTED  MODULES: SYSTEM

  8/76  A                                  100.0

-------
EPA UTILITY  FED  SURVEY; DECIMBF.R 197f  -  JANUARY 1979
                                             SECTION 2
                     DESIGN AND PERFORMANCE  DATA FOR OPERATIONAL  F60  SYSTEMS
	PERFORMANCE DATA	
PERIOD  MODULE  AVAILABILITY CPERAftlLlTY  PLIABILITY UTH17AT10N  X  REMOVAL    PER  BOILER  FGD    CAP-
                                                                  S02   PART. HOURS HOURS  HOURS  FACTOR

        B                                   100.0
        SYSTEM                               100.0                               744

  9/76   A                                   100.0
        B                                   100.0
        SYSTEM                               100.0                               720   720

        ** PRO&LtMS/SOLUTIONS/COMMENTS
              START DATE    9/76      £6tlII«ENT:  FGD SYSTEM, GENERAL
              END DATE      9/76      COfMFNTS:
                            T*E  POILEK  REGAINED  OUT of SERVICE THE  ENTIRE  MONTH. NO SISNIFICANT  PROB-
                            LEWS  WERE  PEPCRTFD.
              AFFECTEO MODULfcS:  SYSTEM

 10/76   A                                    56.0
        B                                    56.0
        SYSTEM                               56.0                               744   417

 11/76   A                                    96.0
        B                                    98.0
        SYSTEM                               97.0                               720   720

        «* PROBLEMS/SOLUT10NS/COMMENTS
              START DATE   11/7*      l-GUIFMENT:  FGO SYSTEM, GENERAL
              tND DATF     11/76     COI»M?NTS:
                            ThO  PINOR fORCFD SCRUBBER OUTAGES OCCURRED  DURING THE PERIOD.
              AFFECTED MODULES:  SYSTEM

        ** PROBIEBS/SOLUTIONS/CCMMENTS
              START DATE   11/76     EOUlfcPENT:  REA6FNT HANDLING
              END DATE     11/76      PFOB If « : ME CHA N 1C AL-RELA TE D  COMPONENT FAILURE
                            A  REHEATER STEAM LEAK CAUSED  A MINOR  FORCED OUTAGE.
              AFFECTED MODULES: SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   11/76     tCUlfHENT:  GAS DAMPER
              END DATE     11/76     PPOBitH: DESIGN-RELATED  FLOW DISTRIBUTION
                            Ad INLET tAS DAMPER  ADJUSTMENT PROBLEM  IN  BOTH THE A-SIDE AND B-SIBE SCRUB
                            BIN6 TRAINS  C/USED A MINOR OUTA6F .
              AFFECTED MODULES: SYSTEM

 12/76   A                                    9B.O
        B                                   1CO.O
        S»STFK                               99.0                               744   744

        •* PROBLtMS/SOLUTIONS/COMMENTS
              START DATE   12/76     EQUIF*ENT: GAS DAMPER
              END DATE     12/76     PROP I.EM: DESIGN-RELATED  FLOU DISTRIBUTION
                            OKE  OUTAGE WAS  REPORTED.  THE  OUTAGE  WAS THE RESULT OF AN ADDITIONAL AD-
                            JUSTMENT TO TUF A-SIDE GAS INLET  DAMPER.
              AFFECTED MODULbS: A

  1/77   A                                    72.0
        B                                    93.0
        SYSTEM                               83.0                               744   744

        ** PROBLEHS/SOIUTIONS/COMMENTE
              START DATE    0/77     ECUIFMENT:
              END DATE      0/77     COMMENTS:
                            TtiE  PERFORMANCE INDEX VALUFS  CONTAINED  IN THESE TABLES ARE  BASED UPON THE
                            MODULES' ACTUAL SERVICE TIME  fOR  THE  PERIOD VERSUS THE NUMBER  OF HOURS THS
                            MODULES ARE CALLED UPON TO OPERATE  FOR  THE SAME PERIOD.  THE  MODULES OPER-
                            ATE  ON A CEMA*D-QNLY BASIS.   FLUE GAS IS BYPASSED  AROUND THE  MODULES WHEN
                            THEY ARE NOT NEOUIBED FOR  SERVICE.
              AFFECTED MODULES: SYSTt*

  2/77   A                                    '9'0
                                                   46

-------
                                                EPA UTILITY  FGD SURVEY:  DECEMBER 1978 - JANUARY  1979
                                              SECTION 3
                     DESIGN  AND PERFORMANCE  DATA FOR OPERATIONAL F6D SYSTFMS
	,	PERFORMANCE  DATA	
PERIOD  MODULE AVAILABILITY CPERAB1LITY  (^LIABILITY OT1L17AT10N  X REMOVAL    PER  BOILER   F6D    CAP-
                                                                    S02   PART.  HOURS HOURS  HOURS  FACTOR

        6                                      99.0
        SYSTEM                                99.0                                672   672

        **  PRObLEMS/SOLUTIONS/COMMENTS
              START  DATE    2/77      tOUlVHENT: ABSORBER
              tNO DATE      2/77      CCMfiFNTS: RESEARCH  AND  DEVELOPMENT
                            ThE fUNTgKi  PACKING IN THE A-SIDE TOWER VIAS  REPLACED.
              AFFECTED  MODULES:  A

        **  PR09LEMS/SOLUTIONS/COFMENTS
              START  DATE    2/77      EfiUI FMEN-T: SCRUBBER
              END DATE      2/77      PROBIFM: CHEMICAL-RELATED PLUGGING
                            MIPiiOR SCRDBEEF VESSEL PLUGEIN6 OCCURRED-
              AFFECTED  MODULES:  SYSTEM

        **  PR03LEMS/SOLUTIONS/COMHENTS
              START  DATE    2/77      EQUIPMENT: F6D  SYSTEM,  GENERAL
              END DATE      2/77      PROPtfHT CHEM1CAL-RELATED CORROSION
                            MINOR CORROSKN OCCURRED  IN  THE  SYSTEM.
              AFFECTED  MODULES:  SYSTEM

        *•  PROSLEMS/SOLUTIONS/CCMMENTS
              START  DATE    2/77      ECUIfMENT: PIPING
              END DATE      2/77      PROBLEM: NOT 0EFINED/SPECIfI ED
                            SOME  PROBLEMS OCCURRED WITH  THE  LIQUID PIPING'
              AFFECTED  MODULES:  SYSTEM

        ** PROSLEMS/SOLUTIONS/COMMENTS
              START  DATE   2/77      EQUIPMENT: GAS  DAMPER
              END  DATE      2/77      PROfiim: MECHANICAL-RELATED COMPONENT  FAILURE
                            TI-.ERE WERE MECHANICAL DIFFICULTIES KITH THF  BY-PASS DAMPERS.
              AFFECTED  MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   2/77      E6UIFMENT: FGD  SYSTEM, GENERAL
              fcND  DATE      2/77      COMMENTS:
                            AVERAGE SCE   IMET/OUTLET VALUES DURING THE  PERIOD WERE 350 PPM  AND  175  PPM
              AFFECTED  MODULES:  SYSTEM

  3/77  A                                      72.0
        B                                      93.0
        SYSTEM                                 83.0                                7*4   7*4

  4/77  A                                    1dO«0
        B                                    100 . 0
        SYSTEM                               100.0                                720   638

  5A77  A                                      87-0
        B                                      B7.0
        SYSTfR                                 £7.0                                744   645

        ** PROBLEMS/SOLUTlONS/COMtfENTS
               START DATE   5/77      E8UIPMENT:  FGD  SYSTEM, GENERAL
               END  DATE     5/77
                            OUTAGE  TIME  F(R THE BOILER  AND  FGO SYSTEM  WAS A RESULT OF THE SCHEDULED
                            MID-YEAR SCRUtBER CLEANOUT.
              AFFECTED MODULES:  SYSTEM

        ** PROHLEMS/SOLUTIONS/CCMMENTS
               START DATE   5/77      EBUIfMENT:  FGD  SYSTEM, GENERAL
               END DATE     5/77      COMMfcNTS:  RESEARCH AND DEVELOPMENT
                            DLRING  BAY REEEARCH-COTTRELL PERSONNEL  CONDUCTED FORCED OXIDATION TESTS  BY
                            BLOWING AIR  1*TO  THE  FLOODED DISC  SCRUBBER AND CONVERTING ALL  CAS03 TO
                            CASO* FO SUPERIOR SLUDGE DEWATER1NG.  HANDLING AND SCALE-FREE  OPERATION.
               AFFECTED MODULES:  SYSTEM

  6/77  A                                     100.0

-------
EPA UTILITY  FGD SURVEY: DECEMBER  1976  - JANUARY 1979
                                             SECTION  3
                     DESIGN  AND  FtRFOFiKAhCE DATA FOR OPERATIONAL FGC SYSTEMS
	PERFORMANCE  DATA	
PERIOD  MODULE AVAILABILITY  CPEPAB1L1TY IFLIAPILITY  UTILIZATION  X REMOVAL    PER  BOILER  FGD    CAP.
                                                                   SOa  PART.  HOURS HOURS  HOURS  FACTOR
— —•——•••  V«W» ««K«««B«MVB«  • _««»»*» ._KW_~««»V  •«.„••»•»••—•••• ••_ H » VB.WV  —•».— • «•«•„•_ — • — ™ ™  VKHKK
        B                                   100.0
        SYSTEM                              100.0                                720   7?0

 7/77   A                                    97.0
        B                                    99.0
        SYSTtM                               98.0                                744   744

        •* PR06LEMS/SOLUT10NS/COMMEN1S
              START  DATE    7/77     tCUIFfENTs  REAGENT  HANDLING
              fcND DATE      7/77     pROBlEM: MECHANICAL-RELATED COMPONENT  FAILURE
                            A MINOR LEAK OCCURRED IN  THE LIMESTONE SLURRY TANK.
              AFFECTED MODULES: SYSTEM

        ** PROBLEMS/SOLUT10NS/COMMENTS
              START  DATE    7/77     EQUIPMENTS  SCRUBBER
              END DATE      7/77     PROetF.M: I»E CHA NIC A L-RE L A TE D COMPONENT  FAILURE
                            A KINOR LEAK CCCURREO IN  THE B-SIDE RETURN LINE  FROM THE FDS TO  THE  FDS.
                            TANK.
              AFFECTED MODULES: B

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    7/77     EeUIfNENTl  FGD  SYSTEM,  GENERAL
              END D»TE      7/77     CCKMFNTS: RESEARCH  AND  DEWELOPKENT
                            RESEARCH-COTTfcELL PERSONNEL  ARE  STILL ON THE PLANT SITE* CONTINUING  FORCED
                            OJUDATION STUMES.
              AFFECTED MODULES: SYSTtf"

 8/77   A                                    97.0
        6                                    99.0
        SYSTEM                               98.0                                744   744

 9/77   A                                   100.0
        B                                   100.0
        SYSTEM                              100.0                                7JO   7?0

        ** PROBLEMS/SOLUTIOMS/COCMENTE
              START  DATE    9/77     t«Ul(*ENT:  FGD  SYSTEM,  GENERAL
              END DATE      9/77     COMMENTS:
                            DOWN TIME WAS REQUIRED TO REPAIR LEAKS IN THE SLURRY DISPOSAL TANK AND  THE
                            FtS RETURN LIf,f. .
              AFFECTED MODULES: SYSTEM

        *« PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    9/77     EQUIPMENT:  SCRUBBER
              END DATE      9/77     PROBi/m: MECHANICAL-RELATEO COMPONENT  FAILURE
                            A LEAK OCCURRED AT THE SLURRY DISPOSAL TANK.
              AFFECTED MODULES: SYSTEM SYSTEM

10/77   A                                   100.0
        B                                   100.0
        SYSTEM                              100.0                                744   744

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    9/77     EQUIPMENT:  FGD  SYSTEM, GENERAL
              END DATE     10/77     COMMITS:
                            NO PROBLEMS W£"5E REPORTED FOR OCTOBER.
              AFFECTED MODULES: SYSTEM

11/77   A                                   100.0
        B                                    98.0
        SYSTEM                               99.0                                720   169

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   11/77     E6UIIMENT:  SCRUBBER
              END DATE     11/77     PROBLEMS MECHANICAL-RELATED  COMPONENT  FAILURE
                            THE P-S1DE OlMAGE WAS  DUE TO LEAKS  IN  THE  VENTURI SECTION  OF  THE SCRUBBER
                            AISD AN EXPANSION JOINT  FAILURE  IN  A  RECYCLE  PUMP-
                                                   48

-------
                                               EP» UTILITY  FGD  SURVEY: DECEMBER 1978  -  JANUARY 1979
                                             SECTION 3
                     DESIGN AND  PERFOPMAkCE DATA FOR OPERATIONAL FGD SYSTEMS
....	_.	_.__	__.._	PERFORMANCE  DATA	
PERIOD NODULE  AVAILABILITY  OPERABIL1TY PLIABILITY UTILIZATION   X REMOVAL   PER  BOILER   FGO   CAP.
                                                                   SO?  PART. HOURS HOURS   HOURS FACTOR

              AFFECTED MODULES:  f

       **  PROBLEMS/SOLUTIONS/COMMENTS
              START BAjE   11/77      EQUIPMENT: RECYCLE  PU«P
              END DATE     11/77      FROB(,Ew: MECHANICAL-RELATED  COMPONENT FAILURE
                           THE  B-SIDE OUTAGE WAS DUE TO  LEAKS  IN  THE VENTURI SECTION  OF THE  SCRUPBER
                           AND  AN EXPANSION JOINT FAILURE  IN  K RECYCLE PUMP.
              AFFECTED MODULES:  E

        **  PROBLEMS/SOLUTIONS/CCMMENTS
              START DATE   11/77      E8U1FMENT: BOILER-RELATED
              END DATE     11/77      COMM^NTSr
                            HIE BOILER OPfRATED ONLY IfB.S HOURS  BECAUSE OF A SHUTDOWN  FOR OVERHAUL IN
                            ThE LAST HALT OF NOVEMBER.   THE  UNIT  IS SCHEDULED TO START  UP  IN  MID-DEC-
                            EHBER.
              AFFECTED MODULES:  SYSTEM

 1Z/77  SYSTEM                                                                  744

        ** PR06LEKS/SOLUTIONS/COMWENTS
              START DATE   12/77      E6UIFMENT: FGD SYSTEM,  GENERAL
              END DATE     12/77      CCMMENTSi
                            THE eOILER AND SCRUBBING SYSTEM  WERE  DOWN AS THE OVERHAUL PERIOD  CONTINUED
                            THIS  MOJOR OVERHAUL CONTINUED  INTO JANUARY 1978.
              AFFECTED MODULES:  SYSTEM

  1/78  A                                    97.0
        6                                    91 .0
        SYSTEM                               94.0                 60.00 99.70   744    135

        ** PROBLEMS/SOLUTIONS/COMMENTS
               START  DATE    1/78      EQUIPMENT: FGD SYSTEM*  GENERAL
               END DATE      1/78      COMMENTS:
                            THE  FLOODED DISC SCRUBBER  TANK HEADER FOR THE LIMESTONE  SLURRY WAS REPAIR-
                            ED AFTER BEING  DAMAGED  DURING  THE OVERHAUL.  THE BOILER  WAS OPERATED ONLY
                            135  HOURS  DURING JANUARY AS  THE  OVERHAUL HAD EXTENDED INTO  THIS  MONTH.
               AFFECTED  MODULES: SYSTEM

  2/78  A                                    99.0
        e           -  -                       68 ve
        SYSTEM                               94.0                 50.00         672    642

        ** PR08LEMS/SOLUTIONS/COWMENTS
               START  DATE    2/78     EBU1FMENT:  F6D SYSTEM,  GENERAL
               END  DATE      2/78     PROBLEM: NOT  DEFINED/SPECIFIED
                            SOME MINOR LftK  REPAIRS AFTER  THE OVERHAUL/CLEANING  TOOK PLACE DURING
                            FEBRUARY.
               AFFECTED  MODULES: SYSTEM

  3/78  A                                    74.0
        8                                    74.0
        SYSTEM                               74.0                               744    744

        ** PR06LEMS/SOLUTIONS/COMHENTS
               START  DATE    3/78     E8UI RHENT:  FGD SYSTEM, GENERAL
               E«D  DATE      3/78     PROBICM: NOT  DEFINED/SPECIFIED
                            CUE  FORCED SHlTDOUN  OCCURRED  ON THE  A-SIDE.
               AFFECTED  MODULES: A

  4/78  A                                    100.0
        B                                    100.0
        SYSTEM                               100.0                                720   720

        ** PROBLEMS/SOLUTIONS/COMMENTS
               START  DATE    4/78     EOUIPKENTr FGD SYSTEM, GENERAL
               END  DATE      4/78      PROBLEM:  NOT  DEFINED/SPECIFIED
                            A  MINOR  LEAK  REPAIR WAS NECESSARY  AFTER  AN  OVERHAUL/CLEANING.
                                                   49

-------
FP« UTILITY  FGD  SURVEY:  DECEMBER 197E - JANUARY  1979
                                            SECTION  3
                     DESIGN AND PERFORMANCE DATA  FOR OPERATIONAL FCG SYSTEMS
			PERFORMANCE  DATA	„.„_...- —
PERIOD  MODULE  AVAILABILITY CPERAPIL1TY  ^LIABILITY  UTILIZATION  * REMOVAL   PER   BOILER   F60   CAP.
                                                                  S02  PART. HOURS  HOURS   HOURS FACTOR

S/78


AFFECTED MODULES: SYSTEM
A
ft
SYSTEM

87.0
98.0
93.0



744
  6/78
  7/78
  9/78
 10/78
        •*  PROBLEMS/SOIUHONS/CCMMENTS
              START DATE   5/76     ECUKMENT:  F6D  SYSTEH,  GENERAL
              END DATE     5/78     COMMITS:
                           THERE WERE NO  SIGNIFICANT  PROBLEMS REPORTED.  ONLY GENERAL  MAINTENANCE WAS
                           PERFORMED ON  THE  SYSTEM.
              AFFECTED MODULES: SYSTEM
        A
        B
        SYSTEM
100.0
100.0
100.0
720
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START KATE   6/78      tOUIPMENT:  F60  SYSTEH, GENERAL
              END DATE     6/78      COMMfNTS:
                           NC  PROBLEMS  WLRE  REPORTED.
              AFFECTED MODULES:  SYSTEM
        B
        SYSTEM
100.0
100.0
744
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   7/78      ECUIFMENT:  FGD  SYSTEH, GENERAL
              END DATE     7/78      COMWCNTS:
                           OALY  ROUTINE  MAINTENANCE HAS
              AFFECTED MODULES:  SYSTEM
  8/78  SYSTEM
 98.0
744
        «* PROBLEMS/SOLUT10NS/COMMENTS
              START DATE   S/78      ECUIfWENT:  RECYCLE TANK
              END DATE     f/7S      PROBIEM: NOT DEFINED/SPECIFIED
                           REPAIRS  MERE  NECESSARY TO PLU66ED B-SIDE REHEAT  COILS.
              AFFECTED MODULES:  B
        8
        SYSTEM
100.0
100.0
                                                                                720   720
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    9/78      EGUIFMENT:  FGD SYSTEH, GENERAL
              END DATE      9/78      COMMENTS:
                            NO  PROBLEMS U(RE REPORTED.
              AFFECTED MODULES:  SYSTF-M
        B
        SYSTEM
100.0
100.0
                                                                                744   434
        ** PR08LEMS/SOLUTIONS/COMMENTS
              START DATE   10/78      EQUIPMENT:  FGD SYSTEH, GENERAL
              END DATE     10/78      COMMFNTS:
                           ONLY  ROUTINE  !>AiNTENANCE WAS REQUIRED.
              AFFECTED MODULES:  SYSTEM
 11/78   SYSTEM
                                            100.0
                                    720   720
        ** PROBLEMS/SOLUTIONSSCOMMENTS
              START DATE   11/78      E6UIFMENT: FGD SYSTEM, GENERAL
              END DATE     11/78      COMMfNTSl
                            NO  PROBLEMS WERE REPORTED.
              AFFECTED MODULES:  SYSTEM
                                                  50

-------
                          EPA  UTILITY F66 SURVEYS DECEMBER 1978 - JANUARY  1979
                        SECTION  31
DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL F66 SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY  CLASSIFICATION
PARTICULATE  EMISSION  LIMITATION - MG/J
S02 EMISSION  LIMITATION - KG/J
NET PLANT  GENERATING  CAPACITY - »w
GROSS UNIT  GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY V/FGD - f
NET UNIT GENERATING CAPACITY WC/FGD -
EOU1VALFNT  SCRUBBED CAPACITY - Mfc
                    i'W
** BOILER DATA
    SUPPLIER
    TYPE
    SERVICE LOAD
    COMMERCIAL SERVICE  DATE
    MAXIMUM BOILER  FLUE  GAS  FLOW - CU.F/S
    FLUE GAS TEMPERATURE  - C
    STACK HE IGHT  -  M
    STACK TOP DIAMETER  -  M

** FUEL DATA
    FUEL TYPE
    FUEt GRADE
    AVERAGE HEAT  CONTENT  - KJ/KG
    RANGE HEAT CONTENT  -  BTU/LB
    AVERAGE ASH  CONTENT - *
    RANCE ASH CONTENT  - X
    AVERAGE MOISTURE  CONTENT - *
    RANGE MOISTURE  CONTENT - X
    AVERAGE SULFUR  CONTENT - *
    RANGE SULFUR  CONTENT  - X
    AVERAGE CHLORIDE  CONTENT - X
    RANGE CHLORIDE  CONTENT - %
    FUEL FIRING  RATE  -  M  T/H
    FUEL FIRING  RATE  -  MW

•* MECHANICAL  COLLECTOR
    PARTICULATE  DESIGN  REMOVAL EFFICIENCY -

** FGD  SYSTEM
    SALEABLE.  PRODUCT/THSOKAWAY PRODUCT
    GENERAL PROCESS TYPE
    PROCESS TYPE
    SYSTEM  SUPPLIER
    A-E FIRM
    DEVELOPMiNT  LEVEL
    NEW/RETROFIT
    PARTICULATE  DESIGN  REMOVAL EFFICIENCY -
    S02 DESIGN  REMOVAL  EFFICIENCY - X
    INITIAL START-UP
    CONSTRUCTION INITIATION
    CONTRACT  AWARDED

• • ABSORBER
    NUMBER
    TYPE
    INITIAL  START UP
    BOILER  LOAD/ABSORBER  -  X
    6AS FLOW  -  CU.M/S
    GAS TEMPERATURE - C

 ** REHEATER
     TYPE
    HEATING  MEpIUI"
     TEMPERATURE  BOOST -  C

 ** WATER  LOOP
     TYPE
     FRESH  MAKEUP WATER ADDITION - LITERS/S
                                                ARIZONA PDPLIC SERVICE
                                                CHQLLA
                                                2
                                                JOSEPH CITY
                                                ARIZONA
                                                t>
                                                   72.
                                                  344.
                                                  615.0
                                                  350.0
                                                  250.0
                                               .167 LB/WMBTU)
                                               .8(50 LB/MMBTU)
                               350.0
                             COMBUSTION ENGINEERING
                             PULVERIZED COAL
                             BASE
                              0/7P
                             ********       <*******
                             *******        <**** F)
                             ******         (**** FT)
                             *******        <***** FT)
                                                 COAL
                                                 SUBB1TUHINOUS
                                                  25609.

                                                    13.50

                                                    15.00
                                                 ******
                                                      .50
                                                 0.44-1.0
                                                      .02
                                                 0.01-0.04
                                                 * ******
                                                 *****
                                             < 101SO BTU/IR)
                                             965-10,600
                                             {*«•* TPM)
                             THROWAfciAV  PRODUCT
                             UET scRueeme
                             LIMESTONE
                             RESEARCH  COTTRELL
                             EBASCO
                             FULL-SCALE
                             NEW
                                99.70
                                75.00
                              4/7*
                              7/75
                             12/74
                             PACKED  fOUEfi  PBECEEDKO  BY  FLOODE0  DISC SCRUBBER
                              6/7?
                                 25.0
                                184.98        (  392000 ACFM>
                                 SO.O        <   122  F>
                              IN-LINE
                              STEAM
                                 22.2
                              OPEN
                                  7.6
                                                                    40  F>
                                             (  120 6PH)
                              51

-------
EPA UTILITY  F60  SURVEY;  DECtMBFfc 197E - JANUARY  1979
                                             SECTION  3
                     DESIGN AND PF R F GRM f>C E  DATA  FOR OPERATIONAL F6D SVSTFMS
 *• REAGENT  PREPARATION EQUIPMENT
      NUMPER  OF  BALL KILLS
      ElALl  MILL  CAPACITY- M 1/H

 *• DISPOSAL
      NATURE
      TVPF
    6.3
FINAL
SLUDGE POMP
(  7.P TP«>
			PERFORMANCE  DATA			
PERIOD  MODULE AVAILABILITY CPERAPIL1TY  (PLIABILITY  UTILIZATION  X REMOVAL   PER  BOILER   F60   CAP.
                                                                  S02  PART. HOURS HOURS   HOURS FACTOR
  4/78   SYSTEM
                                                                                7?0
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   4 /78      EeUIPfENT:  F6D  SYSTEM,
              END DATF     5/78      PROBUM:  NOT  DEFINED/SPECIfI ED
                           SOME PROBLEMS HAVE OCCURRED  V1TH VIBRATIONS THROUGH THF SYSTEM.
              AFFECTED MODULES: SYSTEM

        •* PR06LEMS/SOLUT10NS/COMMENTS
              START DATE   4/78      CGUIfttENT:  F6D  SYSTEM,  GENERAL
              END DATE     5 <7B      COMMENTS:
                           TK FPA  HAS  GRANTED  THE  UTILITY  AH EXTENSION FOR COMPLIANCE.
              AFFECTED MODULES: SYSTEM
  5/78  SYSTEM

  6/78  SYSTEM
                              744
                              7ZO
        ** PROBLfcMS/SOLUTlONS/COMMENn
              START DATE    6/7f      EQUIIMENT:  F60  SYSTEM,  GENERAL
              END DATE      7/78      CCMM ENTS:
                            SHAKFCOWN/CfBlGGlKG  OPERATIONS ARE CONTINUING.
              AFFFCTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    6/78      EGUIFMENT:  PIPING
              END DATE      7/78      PPOBUM: DESIGN-RELATED VIBRATION
                            THE  SLURRY  RECYCLE PIPING HAS EXPERIENCED CONTINUAL VIBRATION.   THE CON-
                            TRACTOR  HAS  PiTN INJECTING NITROGEN GAS INTO THE LINES  TO  DAMPEN THE
                            VIBRATION&fAIR  WAS NOT USED BECAUSE THE SUtFITF. WOULD BE  OXIDIZED TO SUL-
                            FATE  *ND  RfSUlT jfj SCALE FORMATION^.
              AFFECTED MODULES:  SYSTtM

        ** PROBLEMS/SOLUTIONS/COMMtNTS
              START DATE    6/78      tQUIfMENT:  ADSORBER
              END OATF,      7/78      FPOBifM: INSTALLATION-RELATED MATERIALS FAILURE
                            TKC  CORROSION  RESISTANT  COATING  IN THE DOUNCOnER AREA IN  ONE  OF  THE
                            AtSOREER  MODULES HAS BEEN PEELING AWAY.
              AFFECTED MODULES:  SYSTEM
  7/78  SYSTEM

  8/78  SYSTEM
                              744

                              744
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    8/78      fCUIFMENT:  PIPING
              END DATE      9/7S      PROBLEM: DESIGN-RELATED VIBRATION
                            THE  SLURRY COCPONENTS ARE STILL EXPERIENCES RrSONANT  VIBRATIONS.
              AFFECTED MODULES:  SYSTEM

        ** PR06LEMS/SOLUTIONS/CCMMENTS
              START DATE    8/78      EGUIPMENT:  FCC SYSTEM, GENERAL
              END DATE      9/78      COMMENTS:
                            SMKfDOYN/DEEIG6JNG  OPERATIONS ARE CONTINUING.
              AFFECTED MODULES:  SYSTEM
  9/78   SYSTEM

10/78   SYSTEM
                              720

                              744

-------
                                             EPA UTILITY FSD SURVEY: DECEMBER 1978 - JANUARY 1979
                                           SECTION 3
                    DESIGN AND PERFORMKE DATA FOR OPERATIONAL F€D SYSTEMS
	....	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY CPERABIL1TY PLIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                S03  PART. HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE  10/78     teuiFNENT: FCD SYSTEM, GENERAL
             END DATE    11/78     COMMENTS:
                          SMKEDOWN DE.BIGGING OPERATIONS ARE CONTINUING.  SOME SCRUBBER COMPONENTS
                          ARE STILL MANKED BY BECHTEL STAFF, APS IS OPERATING WOST Qf THE SYSTEM  AT
                          THIS  TIME.
             AFFECTED MODULES:  SYSTEM

11/78  SYSTEM                                                                720
                                                 53

-------
EP« UTILITY  FGt> SUPVEV:  DECEMBER 1976 - JANUARY 1979
                                            SECTION 3
                     DESIGN AND PERFOSMrCE DATA FOR OPERATIONAL  FGD  SYSTFMS
 COMPANY  MAKE
 PLANT  NAME
 UNIT NUMBER
 CITY
 STATE
 RE6ULATORY  CLASSIFICATION
 PARTICIPATE  EMISSION LIMITATION - NG/J
 SOZ  EMISSION  LIMITATION - N6/J
 NfT  PLANT GENERATING CAPACITY - MW
 GROSS  UNIT  6ENERATIN6 CAPACITY - ««
 NET  UNIT GENERATING CAPACITY W/FGD - Ml.
 NET  UNIT GENERATING CAPACITY VO/FGD -  fli
 EQUIVALENT  SCRUBBED CAPACITY - My

 **  EOILER DATA
      SUPPLIER
      TYPE
      SERVICE LOAD
      COMMERCIAL SERVICE DATE
      MAXIMUM BOILER FLUE GAS FLOW - CU.»/S
      FLUE GAS  TEMPERATURE . C
      STACK HE IGHT - H
      STACK TOP DIAMETER - M

  •*  FUEL DATA
      FUEL TYPE
      FUEL GRADF
      AVERAGE HEAT CONTENT - KJ/KG
      RANGE HEAT CONTENT - BTU/LB
      AVERAGE A$H CONTENT - 1
      RANGE ASH CONTENT - X
      AVERAGE MOISTURE CONTENT - X
      RANEE MOISTURE CONTENT - X
      AVERAGE SULFUR CONTENT - *
      RANGE SULFUR CONTENT - X
      AVERAGE CHLORIDE CONTENT - *
      RANGE CHLORIDE CONTENT - %
      FUEL FIRING RATE - H T/H
      FUEL FIRING RATE - HU
CENTRAL ILLINOIS  LIGHT
DUCK CREEK
1
CANTON
ILLINOIS
A
   43.
  516.
  400.0
  416.0
  400.0
(  .ICO LB/MMBTU)
( 1.200 LP/MMBTU)
  41ft.0
RILEY STOKER
BALANCED-DRAfTt  FRONT  FIRED DRYBOTTOM, PULV. CCA
BASE
 0/76
  667.7*        <1415000  ACFM)
  135.0         <  275  F)
  152.          <  500  FT)
*******         (*•***  FT)
COAL
BITUMINOUS
 24423.
18.Q
********
******
    ».30
8.0-9.0
      .03
******
   157.8
   400
( 10500 BTU/LB)
 ***** *
(174 TPH)
  ** ESP
      NUMBER
      TYPE
      SUPPLIER
      PARTICULATE DESIGN REMOVAL EFFICIEf>CY
      FLUf GAS TEMPERATURE  -  C
      PRESSURE DROP - *PA

  ** FGD SYSTEM
      SALEABLE PRODUCT/THROW AWAY PRODUCT
      GENERAL PROCESS TYPE
      PROCESS TYPE
      SYSTEM SUPPLIER
      A-E FIRM
      DEVELOPMENT LEVEL
      NEW/RETROFIT
      PARTICULATE DESIGN REMCVAl EFFICIENT
      $02 DESIGN REMOVAL EFFICIENCY  -  t
      COMMERCIAL DATE
      INITIAL START-UP
      CONTRACT AWARDED

  • * ABSORBER
      NUMBER
      TYPE
      INITIAL START UP
      NUMBER OF STAGES
      DIMENSIONS
      SHELL MATERIAL
      INTERNAL MATERIAL
      NUMBER OF NOZZLES
      NOZZLE TYPE
      BOILER LOAD/ABSORBER  -  I
      GAS FLOW - CU.M/S
      GAS TEMPERATURE - C
      LIQUID RECIRCULATXON  RATE  -  LITER/S
COLD  SIDE
POLLUTION  CGNTROL-VALTHER
    99.8
   135.0
      .2
   275 F)
     t IN-H20)
SALEABLE  PRODUCT
UET  SCRUBBING
LIMESTONE
RILEY  STOKFfl/ENUIRONEERING
61LBFRT/COMMONWEALTH
FULL-SCALE
NEW
   99.80
   35.00
 8/7R
 7/76
 8/74
 ROD  DECK  SPRAY TOWER
  7/76
     t>
 40  X 5 X  40
 CARBON STEEL
 HASTALLOV G
    13
 OPEN PIPE ARRANGEMENT
    25.0
   167.01        < 353900 ACFfO
   135.0        i  275 F)
   945.         O5000
                                                  54

-------
                                             EPA  UTILITY  FGD  SURVEY:  DECEMBER  1978 - JANUARY 1979
                                           SECTION  3
                   OES1SN AND PERFORMANCE  DATA  FOR OPERATIONAL  F60 SYSTEMS
    PRtSSURE DROP - KPA
    SUPERFICAL GAS VELOCITY - M/SEC
    S02 INLtT CONCENTRATION - PPM
    S02 OUTLET CONTRATION  - PPM

*• FANS
    NUMBER
    TYPF
    CONSTRUCTION MATERIALS

** HIST ELIMINATOR
    NUMPER
    TYPE
    CONSTRUCTION MATERIAL
    CONFIGURATION
    NUMBER  OF STAGES
    MUMPER  OF PASSES
    VANE  SPACING -  CM
    VANE  ANGLES
    WASH  SYSTEM
    SUPERFICIAL  6AS  VELOCITY  -  HISS
    PRESSURE  DROP  -  KPA

 ** PROCESS  CONTROL  CHEMISTRY
    CONTROL VARIABLES
    CONTROL MANNER
    MODE

 •* PUMPS
    SERVICE
     POND  RETURN
     ROND  RETURN (SPARE)
     WASTE TRANSFER
     WASTE TRANSFER (SPARE)
     MIST  ELIMINATOR SPRAY
     MIST  ELC1MATOR SPARY
     RECIRCULATION
     RECIRCULATION (SPARF)
     SLURRY TRANSFER
     SLURRY TRANSFER (SPARE)

 ** TANKS
     SERVICE
     RECIRCULATION
     WASTE COLLECTION
     LIMESTONE SLURRY STORAGE
     LIMESTONE SLURRY STORAGE  (SPARt)
     MIST ELIMINATOR WASH

 ** WATER LOOP
     TYPE
     FRESH MAKEUP WATER ADDITION - L1TERS/S

 ** REAGENT PREPARATION EQUIPMENT
     NUMBER OF BALL HILLS
     BALL MILL CAPACITY- M  T/H

 *• DISPOSAL
     NATURE
     TYPE
     LOCATION
     TRANSPORTATION
     AREA - ACRES
     CAPACITY - CU.M
    ?.o        ( e.o I
    4.0        ( 13.0 FT/S)
 3000
  252
 4
BOILER I.D.
CARBON STEEL
 4
CHEVRON
HASTALLOY 6
HORIZONTAL
    2
    3
    6.3         ( 2.SO IN)
90 DFG.
CONTINUOUS, 6U  PRESSURE, FRONT AND BACK OF FIRST
    4.0         < 13.0 FT/S)
      .2         ( 1.0 1N-H20)
SO?, PHt SOLIDS CONTENT OF SLURRY
AUTOMATIC
FEEDBACK AND FEED  FORWARD
                                                NUMElER
NUMBER

    4
    1
    1
 CLOSED
    37.8
     1
     3.6
 FINAL
 LINED POND
 ON SITE
 PUMP
    65.0
     317980
(  600  6PM)
(  4.0  TPH)
(   260.0 ACRE-FT)
                                                 55

-------
FPA UTILITY FGD SURVEY:  DECEfBFR  197f  - JANUARY 1979
                                              SECTION  I
                      DESIGN AND  PERFORfAKE DATA FOR  OPERATIONAL  F«D  SYSTEMS
	PERFORMANCE  DATA	"
PERIOD NODULE  AVAILABILITY OPERAPIL1TY  PLIABILITY  UTILIZATION   8!  REMOVAL   PER   BOILER  F60    CAP-
                                                                     S02  PART. HOURS  HOURS  HOURS  FACTOR
  6/7?  SYSTEM

  7/7B  SYSTEM
91.60 99.PO    720     0

               720     0
.(1

.0
        ** PROBLEKS/50LUT10NS/COKMENTS
               START  DATE   7/76      EQUIPMENT:  FGD  SYSTEM, GENERAL
               END  DATE     7/78      COMMtNTS:
                            ALL  FOUR  MODULfS BE C AplE  OPERATIONAL  ON  JULY 24.
               AFFECTED MODULES:  SYS

        ** PRCBLEMS/SOLUTIONS/COWKENTS
               START  DATE   7/78      E8UIf«ENT:  F6D  SYSTEM, GENERAL
               tNO  DATE     7/78      PROBlFM! DESIGN-RELATED UNDERSIZED COMPONENT
                            MODIFICATIONS WERE MADE  TO THE UNpFR  DESIGNED SLURRY  TRANSFER TANK.
               AFFECTED MODULES:  SYS

        ** PROBLEMS/SOLUTIONS/COMMENTS
               START  DATE   7/76      ESUIFWENT:  F6D  SYSTEM, GENERAL
               END  DATE     9/78      PROBLEM: NOT  DEFINED/SPEClFI ED
                            A  PLUGGING PRff'LEM CAUSED BY cOAL  FINES  IN THE SLURRY  WAS EXPERIENCED.
                            THE  FINES RESILTED FROM  COMMON COAL  AND  LIMESTONE HANDLING SYSTEM.
               AFFECTED MODULES:  SYS

        ** PROBLEMS/SOLUTIONE/COMMENTS
               START  DATE   7/78      E6UIFWENT:  REAGENT HANDLING
               END  DATE     9/78      FROEIFM: NOT  DEFINED/SPECIFIED
                            ThE  COMMON C0 a  AND  LIMESTONE HANDLING  SYSTEM ALLOWED  COAL FINES  TO  PLUG
                            TfcE  FGD SYSTEM
               AFFECTED MODULES:  SYS
  8/78  SYSTEM
  9/78  SYSTEM
                                                                                   744
                                                                                   720   691
                                                                                                        .0
                                                                                                        .0
        ««  PROBLEMS/SOLUTlONS/COMMtNTS
               START DATE    9/78     EGUIFPENT:  FGD SYSTEM,  GENERAL
               fcND DATE      9/78     ppOBLFBs  NOT DEFINED/SPECIFIED
                             SCREEN BASKcTT  WERE  USED TO KEEP  COAL  PARTICLES  FROM  THE LIMESTONE.
                             CCAL PARTICLES  RfSULT FROM COMMON  HANDLING SYSTEM.
               AFFECTED MODULES: SYS

        *»  PROBLEMS/SOLUTIONS/COMMENTS
               START DATE    9/78     tSUIH^ENT:  REAGENT HANDLING
               END DATE      9/78     FROBS.FM:  DESIGN-RELATED  UNDERSIZED COMPONENT
                             TtiE SLURRY TRANSFER  SYSTEM PREVENTED  PROPER SLURRY  FLOW D t)E TO  UNDER
                             DESIGN.  THE  CLD  SYSTEM WAS REPLACED  KITH A NEW  PIPING SYSTEM.
               AFFECTED MODULES: SYS

        **  PROBLEMS/SOLUTIONS/COMMENTS
               START DATE    9/78     ISUIM-ENT:  VALVES
               END DATE      9/78     PROBLEM:  CHEMICAL-RELATED PLUGGING
                             PLUGGING OF TFE  RECYCLE PUMP SHUT-OFF  VALVFS OCCURED.
                             BEING REPLACED  KITH  PINCH VALVES.
               AFFECTED MODULES: SYS
                                  THE
                   THE  VALVES ARE
        **  PROBLEMS/SOLUTIONS/COMMENTS
               START DATE    9/78     EGUIFMENT:  PUMP, OTHER
               END DATE      9/78     PPOBUM:  C H E«l C AL-RELA T? D PLUGGING
                             TfcE SCRUEiEEB  (.ASTE WATER SUMP PUMPS HAVE BEEN  PLUGGING.  NEW  Pu«PS ARE
                             BEING INVESTIGATED.
               AFFECTED MODULES: SYS
 10/78  SYSTEM
                                                                                   744
                                                                                          449
                                                                                                         .0
        ** PROBLEMS/SOLUTIONS/COMMENTS
               START BATE   10/78     tCUIFMENT:  VALVES
               END DATE     10/78     PROBLEM;  NOT 0EFINED/SPECIFI ED

-------
                                                FPA UTILITY FGD SURVEY:  DECEMBER 1978  -  JANUARY 1979
                                              SECTION  3
                      DESIGN AND PERFORPIAHE DATA FOR OPERATIONAL FGD  SYSTEMS
	.	PERFORMANCE  DATA	
PERIOD NODULE AVAILABILITY CPERABILITY FtLIABlLITY  UTILIZATION  X  REMOVAL   PER  BOILER   F60   CAP.
                                                                    S02   PART. HOURS HOURS  HOURS FACTOR
*"—•"*••• •*"»—•- — w*—WMHW—w VW«H«B«*.W _—•—*.____«...  «vBa.MBHik«av_  ••_»•«  • • — «-.— »_«•••. v. — m. ^ _  _«,«••> ••••• —
                            A LEAKING  VALVE RESULTED  IN  CONTAMINATION OF THE RECYCLE  PUMP  6LAND SEAL
                            WATER  SYSTEM HTH POND  RETURN WATER CAUSIN6 SCALING AND  PLUGGING FOXING
                            SHUTDOWN  OF Tli£ RECYCLE  PUMPS.  A NEW VALVE SYSTEM WAS INSTALLED AND THE
                            OPERATING  PRESSURES  WERE  CHANGED.
              AFFECTED MODULES:  SYS

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE  10/78      E8UIFMENT:  RECYCLE  PUMP
              END  DATE    10/7B      PROBITM: NOT DEFINED/SPECIFIED
                            THE  RECYCLE PU'PS WERE  SHUT  DOWN KHEN CONTAMINATION OF THE  GLAND SEAL
                            WATER  SYSTEM CAUSED  BY  A  FAULTY VALVE   CURRED.
              AFFECTED MODULES:  SYS

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE  10/78      EOUIFRENT:  VALVES
              END  DATE    10/7B      PfOPifM: NOT DEFINEO/SPFCJFIED
                            A  FLOW CONTROL VALVE WAS  REMOVED BECAUSE IT CAUSED ABRASION  AND  FAILURE
                            OF THE RECYCLE HEADER.   NONE OF THE MODULES NOW UTILIZE  FLOW CONTROL
                            VALVES.
              AFFECTED MODULES:  0

        *+ PR08LEMS/SOLUT10NS/C00MENTS
               START  DATE  10/78      ECUIPPENT:  MIST  ELIMINATOR
              END  DATE    10/76      PROBLEM: NOT DEFINED/SPECIFI ED
                            T*E  MIST  ELIMINATOR  SPRAY NOZZLES PLUGGED PY COAL PARTICLES  WERE CLEANED
                            THE  COAL  PARTICLES  RESULT FROM A COMMON  COAL/LIMESTONE HANDLING  SYSTFM.
                            A  LlfiUlD/SOLIl SEPARATOR  HAS BEEN INSTALLED IN THE SLURRY SYSTEM TO PRE-
                            VENT  REOCCUSRIMCE.
               AFFECTED MODULES:  SYS

        ** PROBLEMS/SOLUTIONS/COMMENTS
               START  DATE  10/78      ECU1PKENT:  F6D  SYSTEM, GENERAL
               END  DATE    10/78      PROBLEM: NOT DEFINED/SPECIFIED
                            EXCESSIVE LIMiSTONE  CARRYOVER TO THE  BIST ELIMINATOR WAS  NOTED.   THE TOP
                            RCD  DECK  VAS REMOVED TO  IMPROVE G/>S FLOW ANo ELIMINATE THE  CARRYOVER
                            PROBLEM.
               AFFECTED MODULES:  SYS

         ** PROBLEMS/SOLUTIONS/COMMENTS
               START-MT-E  10/78      ESUIfMENT:  FGD  SYSTEM GENERAL
               END  DATE     11/78     PROBLFM: DESIGN-RELATED FLOW DISTRIBUTION
                            BLANK OFF PL A IF S  WERE  ADDED TO THE LCI HER SEVEN ROD DECKS TO  MAINTAIN
                            PRESSURE  CROP  REQUIREMENTS.  THIS HAS BEEN  FOUND TO BE AN ACCEPTABLE:
                             SOLUTION  AT 01HER ENVIRONEERIN6 SYSTEM  INSTALLATIONS.
               AFFECTED MODULES: SYS

         ** PROBLEMS/SOLUTIONS/COMMENTS
               START DATE   10/78     EQUIPMENT:  REAGENT HANDLING
               END  DATE     10/78     PROBLEM: NOT  DEFINED/SPECIFIED
                            THE  COMMON  CO />L /L1M E STONE HANDLING SYSTEM ALLOWED CflAL  PARTICLES TO PLUG
                            MIST ELIMIHATCR  SPRAY  NOZZLES.  A LIQUID/SOLID SEPARATOR HAS BEEN INSTAL-
                            LED  TO PREVEN) FUTURE  PLUGGING.
               AFFECTED MODULES: SYS

 11/78   SYSTEM                                                                    7ZO    661            .C

         «* PROBLEMS/SOLUTIONS/COMMENTS
               START DATE   11/78     EOUIFMENT:  PUMP, OTHER
               END DATE     11/78     PROBLEM: MECHANICAL-RELATED  MATERIALS  FAILURE
                             THE  B-MODULE  SLURRY TANK  PUMP LINER  EXPERIENCED  A FAILURE RESULTING  IN
                             SCRUBBER SYSTEM  SHUTDOWN.   THE  SPARE  PUMP WAS ALREADY OUT OF SERVICE  TO
                             REPLACE ITS ORIGINAL 50-HP  MOTOR  WITH A 75-HP MOTOR.
               AFFECTED MODULES: B

         ** PROBLEMS/SOLUTIONS/COMMENTS
               START DATE   11/78     E6UIFMENT: PUMP, OTHER
               END DATE     11/78     PROBlfN: DESIGN-RELATED  UNDERSIZED  COMPONENT
 BAD C3471     0



                                                    57

-------
EPA UTILITY  F&D  SURVEY:  DECEPGER 197F. - JANUARY 1979
                                            SECTION  3
                     DESIGN AND PERFORMAtfE DATA FOR OPERATIONAL  F6D SYSTFHS
	PERFORMANCE  DATA	
PERIOD  MODULE  AVAILABILITY OPERA01L1TY  PLIABILITY UTILIZATION   X  REMOVAL   PER  BOILER  F6D    CAP.
                                                                  S02  PART. HOURS HOURS  HOURS  FACTOR

                           A SPARF SLURR1 TANK  PUMP WAS  OUT  OF  SERVICE TO REPLACE ITS ORIGINAL  <0-HP
              AFFECTED MODULES: B

        •*  PROBLEMS/SOLUTIONS/COKMENTS
              START DATE  11/78     tOUIFKENT:  REAGENT  HANDLING
              END DATE    11/78     PROBLEM: MECHANICAL-RELATED  MATERIALS FAILURE
                           TfcE PINION SEARING ON THE BALL  MILL  DRIVE FAILED.  THE FAILURE IS BEING
                           1&VESTIGATED.  FGD SYSTE OPERATION WAS HALTED DUE TO THE FAILURE-
              AFFECTED MODULES: SYS

        **  PROBLE«S/SOLUT10NS/COI»MENTS
              START DATE  11/78     tCUIOENI:  INSTRUMENTAL CN
              END DATE    11y78     F'ROBlfM: NOT DEFINEO/SPF CIFI ED
                           THE LEVEL AND DENSITY INSTRUMENTS ON  RECYCLE TANKS ARE BEING MODIFIED.
              AFFECTED MODULES: SYS
                                                                                            i
        *•  PROBLEMS/SOLUT10NS/COKMENTS
              START DATE  11/78     E6U1FMENT:  INSTRUMENTATION
              END DATE    11/78     PROBIFM: NOT DEFINED/SPECIFI ED
                           THE LEEDS I  NCRTHRUP LEVEL  AND  DENSITY TRANSMITTERS ARE BEING REPLACED
                           WITH ROSEttOUNl TRANSMITTERS.
              AFFECTED MODULES: SYS

-------
                                             EPA  UTILITY FED SUSVEY: DECEMBER 1978  -  4ANUARV  1979
                                            SECTION  3
                    DESIGN AND PERFOKMA«E  DATA  FOB OPERATIONAL F6D SYSTEMS
COMPANY MAKE
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICIPATE  EMISSION LIMITATION
S02 EMISSION  LIMITATION - hG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD - nk
NET UNIT 6ENERATING CAPACITY WC/FGD -  fV
EOUIVALENT SCRUBBED CAPACITY - *W

** BOILER  DATA
    SUPPLIER
    TYPE
    SERVICE  LOAD
    COMMERCIAL  SERVICE DATE
    MAXIMUM  BOILER FLUE GAS  FICH - CU.f/S
    FLUE GAS  TEMPERATURE - C
    STACK  HEIGHT - M
    STACK  TOP DIAMETER - M

** FUEL DATA
    FUEL  TYPE
    FUEL  GRADE
    AVERAGE  HEAT CONTENT - KJ/KG
    RANGE  HEAT  CONTENT - BTU/LB
    AVERAGE  ASH CONTENT -  J
    RANGE  ASH CONTENT  - X
    AVERAGE  MOISTURE CONTENT - X
    RANGE  MOISTURF CONTENT - I
    AVERASE  SULFUR CONTENT - *
    RANGE  SULFUR CONTENT - Z
    AVERAGE  CHLORIDE COUTE&T - %
     RANGE .CHLORIDE CONTENT - *
     FUEL FIRING RATE - M T/h
     FUEL FIRING RATE - MW

 **  ESP
     NUMPER
     TYPE
     SUPPLIER

 **  F66  SYSTEM
     SALEABLE PRODKCT/THfiOWAWAY PRODUCT
     GENERAL PROCESS  TYPE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEU/RETROFIT
     PARTICIPATE DESIGN REMOVAL EFF1C1EKCY
     S02 DESIGN  REMOVAL EFFICIENCY  -  2
     COMMERCIAL  DATE
     INITIAL START-UP
     CONSTRUCTION  INITIATION
     CONTRACT AWARDED

 **  ABSORBER
     NUMBER
     TYPE
     INITIAL START  UP
     SUPPLIER
     NUMBER OF STAGES
     SHELL MATERIAL
     SHELL LINER MATERIAL
     BOILER LOAD/ABSORBER  - X
     GAS FLOW -  CU.M/S
     GAS TEMPERATURE  -  C
     LIOUID RECIRCULATION  RATE  -  L1TER/S
     PRESSURE DROP  -  KPA
     SUPERF1CAL  GAS  VELOCITY  .  M/SEC
    COLUMBUS  &  SOUTHERN OHIO ELEC.
    CONESVULE
    S
    CONESVTLLE
    OHIO
    B
                    (****** LB/MMBTU)
                    C 1.000 LP/MMBTU)
 430.
2100.0
 411.0
 375.0
 391.0
 411.0
     COMBUSTION ENGINEERING
     PULVERIZED COAL, DRV BOTTOM
     BASE
      0/77
     ********       (******* ACF|O
       146.7        < 296 F>
       244.         < 800 FT)
     *******        (***** FT)
     COAL
     BITUMINOUS
      25237.

        15.10
     12-19
         7.50
     ******
         4.67
     4.2-5.1

     ******
       149.7
     *****
               (  10850 BTU/L9)
               10300-11220
               <165 TPH>
     COLD SIDE
     RESEARCH COTTRELL
     THROWAUAY- PRODUCT
     WET SCRUBBING
     LIME
     THIOSOR6IC
     AIR CORRECTION DIVISION, UOP
     BLACK R VEACH
     FULL SCALE
     NEW
- X     99.60
        89.50
      2/77
      1/77
      5/75
     10/74
     TURBULENT CONTACT  ABSORBER
     11/77
     AIR CORRECTION  DIVISION,UQP
         4
     CARBON STEEL
     NEOPRENE
        60.0
       298.44
       141.1
      2394.
         1.8
         3.9
               ( 632416 »CFM>
               (  206 F)
               (38000 GPM>
               < 7.3 IN-H20)
               ( 12.8 fits')
                                                 59

-------
EPA UTILITY  F6D  SURVEY: DECEMBER 197f - JANUARY  19?9
                                             SECTION  3
                     DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL FCo SYSTEMS
 **  ABSORBER
      NUMPER
      TYPE
      INITIAL START UP
      SUPPLIER
      NUMBER  OF STACES
      SHELL  MATERIAL
      SHELL  LINER MATERIAL
      BOILER  LOAD/ABSORBER - X
      GAS FLOW - CU.M/S
      6AS TEMPERATURE - C
      LiauiD  RECIRCULATION RATE  - LITER/S
      PRESSURE DROP - KPA
      SUPERFICAL KAS VELOCITY -  M/SEC

  **  FANS
      NUMBER

  **  VACUUM  FILTER
      NUMBER

  **  MIST ELIMINATOR
      NUMBER
      TYPE
      CONFISCATION

  **  MIST ELIMINATOR
      NUMBER
      TYPE

  **  PU|»|PS
      SERVICE
      RECYCLE
      TRANSFER TANK  PUMP
      MAKE-UP SLURRY PUMP
      RECYCLE TANK SLUDGE  PUPP
      M.E. WASH  TANK PUMP
      RECLAIMED  WATER  PUMP

  ** TANKS
      SERVICE
      RECYCLE
      RECLAIMED  WATER  TANK
      SLURRY TRANSFER  TANK
      SLURRY STORAGE
      M.E. WASH  TANK
               ( 632416 ACFM>
               (  286 F>
               (38000 6PM)
               < 7.3 IN-H20)
               ( 12.? FT/S)
TURBULENT CONTACT ABSORBER
 1/77
AIR CORRECTION  OlVlSIONfUOP
    4
CARBON STEEL
NEOPRENE
   60.0

  141.1
 2394.
    1.8
    3.9
 4
CHEVRON
HORIZONTAL
ENTRAPMENT SEPARATOR
NUMBER

   1
   1
   1
   1
   1
     THICKENER
      CONSTRUCTION MATERIAL
      DIAMETER - M
      OUTLET SOLIDS  -  X
CARBON STEEL WITH  CONCRETE  FLOOR
   44.2         (145  FT)
   32.5
  ** WATER LOOP
      TYPE
      FRESH MAKEUP  WATER  ADDITION - LITEK5/S

  ** TREATMENT
      TYPE
      CONTRACTOR
      PRODUCT CHARACTERISTICS
OPEN
   31.5
                (   500  6PM)
PROPRIETARY  (POZ-0-TEC)
IUCS
73X SOLlCS
  ** DISPOSAL
      NATURE
      TYPE
      LOCATION
      TRANSPORTATION
      AREA - ACRES
FINAL
LANDFILL
ON-SITE
PIPE
   50.0

-------
                                               EPA  UTILITY FGD SURVEY: DECEMBER  1978  -  JANUARY 1979
                                             SECTION  3
                     DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL FGD SYSTEMS
—.	.	_	_	PERFORMANCE  DATA	
PERIOD MODULE  AVAILABILITY OPERABILITY  RELIABILITY  UTILIZATION  55 REMOVAL   PER   BOILER   FGD   CAP.
                                                                  502  PART.  HOURS  HOURS   HOURS FACTOR


12/76  SYSTEM                                                                   744

       ** PROBLEMS/SOLUTIONS/COMENTS
              START DATE  12/76      EflUIFKENT:  F6D  SYSTEM. GENERAL
              END DATE    12/76      PPOBIFM:  NOT DEFINED/SPECIFIED
                           A MAJOR  FIRb  IN MODULE A  DFLAYED THE UNIT START-UP.   THE  FIRE  CAUSED 12.1
                           MILLION  DAMAGf.   THE UTILITY'S INSURANCE COVERED  THE  DAMAGE AND  A NEW
                           SCRU6BFR MODULE WILL BE  PURCHASED FROM AND INSTALLED  BY UOP.
              AFFECTED MODULES:  A

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  12/76      EOUIFWENT:  FGD  SYSTEM, GENERAL
              END DATE    12/76      COMMENTS:
                           THE UTILITY  IS  CURRENTLY  CONDUCTING AIR AND WATER TESTS ON  WODULF B.
              AFFECTED MODULES:  B

  1/77   STSTEW                                                                  744

        **  PROBtEMS/SOLUTIONS/COMMiNTS
              START DATE   1/77      EfiUlfMENTs  FGD  SYSTEM, GENERAL
              END BATE     1/77      COMMENTS:
                           IMTIAt  START-UP  FOR DEBUGGING AND COMMISSIONING  PURPOSES OCCURRED IN
                           EARLY JANUARY.   COMMERCIAL AVAILABILITY FOR SERVICE OCURRED ON JANUARY
                           27.
              AFFECTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/CCMWENTS
              START DATE   1/77      EQUIPMENT:  F6D  SYSTEM, GENERAL
              END DATE     1/77      PFOBIFM: WE ATHER-RELATE D COMPONENT FAILURE
                           EARLY OPERATIONS  WERE MARKED BY COLD WEATHER  RELATED  PROBLEMS  SUCH AS
                           FROZEN LINES AND  GEARS,  CRACKED FLANGES, A FR07EN LIME  BELT CONVEYOR, AND
                           A  FROZEN PIPELINE FROM THE THICKENER TO THE IUCS  FACILITY.
              AFFECTED MODULES:  SYSTEM

  2/77  B                        43.0                    43.0
        A
        SYSTEM                                                                  672    668

        **P*OaLE*S/SOLUTIONS/COMMENTS
               START DATE   2/77      tOUIFWENT:  FGp SYSTEM, GENERAL
               END DATE     2/77      COMMENTS:
                           COMMERCIAL ST'PT-UP  OF MODULE  8 OCCURRED ON  FEBRUARY  13,  1977.  THE LONG-
                           EST  PERIOD OF CONTINUOUS OPERATION WAS  132 HOURS.
               AFFECTED MODULES:  B

        ** PROBLEMS/SOLUTIONS/COMMENTS
               START DATE   2/77      EfiUl FPENT:  ESP
               END  DATE     2/77      COMMENTS:
                           TfcE  UTILITY  RtPORTED  THAT THE  ESP OPERATED SATISFACTORILY.
               AFFECTED MODULES:  SYSTEM

        ** PR08LEMS/SOLUTIONS/COMMENTS
               START BATE   ?/77      E6UIFHENT: PIPING
               END  DATE     2/77      F'F!OPLFM: DESIGN-RELATED  PRESSURE SURGES
                           PRESSURE SURE IS OCCURRED IN  THE PRfSATUDATOR  PIPING*
               AFFECTED  MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
               START DATE    2/77      EQUIPMENT: GAS  ANALYZER
               END  DATE      2/77      PROBLEM: MECHANICAL-RELATED  COMPONENT FAILURE
                            THE  CONTINUOUS S02  ANALYZERS OPERATED  UNSATISFACTORILY.
               AFFECTED  MODULES:  SVSTEP

        ** PROBLERS/50LUTIONS/COMMENTS
               START DATE    2/77      tOUIFPENT:  ABSORBER
               END  DATE      2/77      PP06tFM: DESIGN-RELATED  FLOW  DISTRIBUTION
                                                  61

-------
EPA UTILITY FGD SURVEY: DECtMBFR 1978  -  JANUARY 1979
                                               SECTION 3
                      DESIGN  JND  PERFOPP.AfCE  DATA FOR OPERATIONAL  FC-0  SYSTFWS
	PERFORMANCE  BAT A	
PERIOD MODULE  AV«ILAPILITY  OPERABIL1TY  PLIABILITY UTILIZATION   X  REMOVAL   PER   BOILER  F6D    CAP.
                                                                      S02   PART. HOURS  HOURS  HOURS  FACTOR
— ————— — ———— — —  — — — — .- — — —..»• — „  ••—•___ „ v_  -•»»*• — — — «.__.«, __ „••»•,^^«..—  »»•• »««»•• — — • • —  — •-——_• „,«. — «•  •.•*••*•
                             MODULE B EXPEfIENCED POOR  VELOCITY DISTRIBUTION THROUGH  THE TCA BEDS.
               AFFECTED MODULES: B

        ** PRObLEKS/SOLUTIONS/COMFENTS
               STAPT DAjE    2H1     i Ctl tr ENT: MIST ELIMINATCR
               END DATE      2/77     FFOBITM: NQT DEFINED/SPECIF1 ED
                             SCRUFEUNE LIGIOR WAS CARRYING OVER INTO  THE MIST ELIMINATOR SECTION
               AFFECTED MODULES: E
  4/77
        A
        B
        SYSTEM
             40.0
                                       39.0
                                                   36.0
                                                                                    744
                                                                                    720   685
        **  PROELEMS/SOLUTION&/COHHENTS
               START DATE    4/77      eeilllPENT:  F60  SYSTEM, GENERAL
               END DATE      5/77      COMMfNTS:
                             A STACK  OUTLET TEMPERATURE  OF 20C F  IS  BEING MAINTAINED  IN ORDER  TO  !»IN-
                             1FUE  ACID  RAINOUT AND  STACK CORRCSION  PROBLEMS.
               AFFECTED  MODULES: El

        **  PR06LEMS/SOLUTIONS/COMENTS
               START DATE    4/77      ECUirwENT:  ABSORBER
               END DATE      5/77      PF.OBlFH: C HEMI C AL-RFLA T F fi CORROSION
                             TtE 716  SS  PRfSATURATOR  ARFA HAS  EXPERIENCED CORROSION-
               AFFECTED  MODULES: B

        **  PROBLEMS/SOLUTIONS/COKWENTS
               START DATE    4/77      EeUIFflENT:  RECYCLE TANK
               END DATE      5/77      I'ROEUEM,: INSTALLATION-RELATED  MATERIALS  FAILURE
                             TI-E RUBBER  LI^ER IN  THE  RECYCLE TANK HAS BEEN PEELING AWAY.   THE  PROBLEM
                             APPEARED TO  P* APPLICATION-RELATED.
               AFFECTED  MODULES: S

        **  PROBLEMS/SOLUTIONS/COMMENTS
               START DATE    *'"      fQUlFPENT:  THICKENER
               END DATE      5/77      PFOfUfM: C HEMI C AL-RELATE 11 PLUGGING
                             SCXE PLUGGING HAS OCCURRED  IN THE TUBE  THICKENERS.
               AFFECTED  MODULts: SYSTEM

        *•  PROBLEMS/SOLUTIONS/COCMENTS
               START DATE    4/77      ECUJf^ENT:  REA6ENT HANDLING
               END DATE      5/77      PROBIEH: NOT DEFINED/SPECIFIED
                             TKE BUALITY Of THE LIKE  SLURRY HAS BEEN A PROBLEM AREA.  HOCKS  UP TO FIVE
                             INCHES IN DIAf-FTER HAVE  BEEN DETECTED*   THIS HAS  PROMPTED DRAVO TO INSTALL
                             MECHANICAL  SEPARATORS AND »!ETAL DETECTORS AT THE  LIME SHIPMENT  FACILITY.
               AFFECTED  MODULES: SYSTEM
  5/77
  6/77
A
B
SYSTEM

A
B
SYSTEM
                      58.0
                      66.0
50.0
                                   59.0
                                                51.0
                                                60.0
                                                            48.0
                                                             58.P
                                                                                    744
                                                                                    7ZO
                                                                                           71 2
                                                                                           713
         ** PROfaLEMS/SOLUTIONS/COMMENTS
               START  DATE   6/77      £6U1H«ENT:  F6D SYSTEM,  GENERAL
               END  DATE     6/77      CCKMkNTS:
                             T»E  F-EIDE MODULE DID NOT OPERATE THE ENTIRE  MONTH PENDING COMPLETION
                             Of  A  NUMBER Of  NECESSARY MODIFICATIONS AND  REPAIRS.
               AFFFCTED MODULES:  B
  7/77
         A
         B
         SYSTEM
                                                                            744
                                                                                  744
                                                     62

-------
                                              EPA UTILITY  F6C SURVEY: DECEMBER 1978 - JANUARY  1AS  NOT  OPERATED THE ENTIRE NONTH.  REPAIRS AND MODIFICATIONS
                           CONTINUED  UNTIL SEPTEMBER  13.  THERE  WERE SOME WEATHER-RELATED DELAYS.
              AFFECTED  MODULtSs SYSTEM

  9/77  A
        B            52.9        39.9         46.9        26.0
        SYSTEM                                                                 720   469

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   9/77     EQUIPMENT:  FGD SYSTEM,  GENERAL
              END DATE      9/77     COMMiNTS: RESEARCH  AND  DEVELOPMENT
                           THE PARTICULAR DROP  TEST  SCHEDULED  FOR SEPTEMBER 1977 HAS PUSHED BACK  TO
                           THE VEEK OF OCTOBER  24 1977.
              AFfECTED MODUtES: SYSTEM

 10/77  A
        e            32.0        24.0         25.0        18.0
        SYSTEM                                                                 ?**   559

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   10/77     ECUIFPENT:  FGD  SYSTEM, GENERAL
              END DATE     11/77     CCMMfMTS:


                                                  63

-------
EPA UTILITY  FGD  SURVFY: DECEMBER 197!  -  JANUARY 1979
                                             SECTION 3
                     DtSlCN AND PERFORhASCE  DATA  FOR OPERATIONAL FGD SYSTEMS
------------------------------------------ PERFORMANCE  DATA
PERIOD MODULE  AVAILABILITY CPERAE'ILJTY  PLIABILITY  UTILIZATION
                                                                  X REMOVAL    PER   BOILER  FGD   CAP-
                                                                  SO?   PART.  HOURS HOURS  HOURS  FACTOR
                           THE  SCRUBIER  MS  DOWN FROM OCTOBER 10 TQ NOVEMBER  1Q.
              AFFECTED MODULES:  SYSTEP

        **  PROBLEMS/SOLUT1 ONS/COKWENTS
              START DATE  10/77      EGUIfKENT:  ABSORBFR
              END DATF    10/77      PROPiEfl: I NSTA LI AT 1 ON- R ELATE D MATERIALS  FAILURE
                           6-MOt>ULE  HAC  10  BE REL1NFD IN SOME AREAS HlTH NtOfRENE RUBBER
              AFFECTED MODULES:  B
 11/77
       A
       B
       SYSTEM
                   10.0
                   33.0
 4.0
33. C
                                              4.0
                                             33-0
                                                          4.0
                                                         33. C
                                                                                720   715
        ** PROBLEMS/SOLUTIONS/COKNENTS
              START DATE  11/77      EaUlFPtENT:  ABSORBER
              END DATE    11/77      COMMENTS:
                           MODULE  A  WENT  HACK ON LINE NOVEMBER 21.  DURING  LOW  LOAD  PERIODS SOLIDS
                           BIRD UP  THiDfD  TO CAUSE PLUGGING BECAUSE Of LOW  FLOW  RATES.  DURING THE
                           LOW  LOAD  PERILS ALL GAS WAS DUCTED THROUGH ONE  MODULE WHILE THE OTHER WAS
                           ShUT  DOWN.
              AFFECTED MODULES:  SYSTEM
12/77
       A
       6
       SYSTEM
                   93.0
                   97.0
64.0
79.0
                                             62.0
                                             76.0
                                                         22.0
                                                         27. C
                                                                                744
        ** PROBLEMS/SOLUTlONS/COMflENTS
              START DATE   12/77      ECUITMENT: f6D SYSTEH, GENERAL
              END DATE      3/78      COMMENTS:
                            TKE UNIT  WENT DOWN DECEMBER 12 FOR A  S-NONTH  SCHEDULED OUTAGE.  MODULE A
                            HE6AN  COPKFKC3AL OPERATIONS DECEMEED  3 OPERATING  AS  MUCH AS POSSIBLE
                            THROUGH  DECEMiER 12.  MODULE B OPERATED  DECEMBER  1  THROUGH 12.  DURING THE
                            SHUTDOWN  THE  UIL1TY WILL DECIDE  IF THE  SYSTEM  SUPPLIERS HAVE MET SPFCS
                            ON  THE BOILER 'ND TURBINES.  THE  UNIT IS  SCHEDULED  TO BE BACK ON LINE IN
                            MID-MARCH FrUT THIS KAY BE PUSHED  6ACK TO  APRIL  1.
              AFFECTED MODULES:
        ** PROBLEMS/SOLUTIONS/COMMENTE
              START DATE   12/77      F.OUIFMENT.: STACK
              END DATE      3/78      PRtP IFM : -D E SIGN'-RFLATED  INFERIOR  CONSTRUCTION
                            DURING  THE  DEUMSER TO MARCH 197? SHUTDOWN  THE  CARBON STEEL FLUE WILL BE
                            REPLACED  kITH AN ACID-BRICK LINING.
              AFFECTED MODULES:  SYSTKtf
  1/7P
  2/7«
3/7fi
       A
       B
       SYSTEM

       A
       B
       SYSTEM

       A
       B
       SYSTEM
                   20.0
                   20.0
19.0
                                             64.Q
                                             54.0
                                                         10.0
                                                          8.0
                                                                                744
                                                                                672
                                                                                744
                                                                                      379
        ** PROBLEMS/SOLUTIONS/COMMENTS
              ST*RT DATE    3/78      EOUIIflENT: FGC SYSTEM,  GENERAL
              £ND DATE      3/78      COMMENTS*
                            TfcE  UNIT  STARTED UP AGAIN ON HAfiCH  16.
              AFFECTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COKMENTS
              START DATE    3/78      EGUIfPENT: GAS ANALYZER
              END DATE      3/78      PROBLEM: NOT DEFINED/SPECIFIED
                            P*  CONTROLS AM) S02 ANALYZERS HAVE  EXPERIENCED OPERATIONAL PROBLEMS
              AFFECTED MODULES:  SYSTEM
                                                  64

-------
                                               EPA  UTILITY FGD SURVEY:  DECEMBER 1978 -  JANUARY 1«79
                                             SECTION  3
                     DESIGN  AND  PERFORHA HC E DATA  FOR OPERATIONAL  FGD  SYSTEMS
	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY  OPERABILITY  PLIABILITY  UTILIZATION  %  REMOVAL   PER  BOILER   FGD   CAP.
                                                                   S02   PART. HOURS HOURS   HOURS FACTOR
        **  PR06LEMS/SOLUTIONS/COMMENTS
              START DATE    3/78     E6L)I FI"! ENT:  FGD  SYSTEM, GENERAL
              END DATE      3/78     PROBLEM:  CHEMICAL-RELATED PLUGGING
                            IMPURITIES IN THE  LIME  HAVE CAUSED PLUGGING  PROBLEMS.
              AFFECTED MODULES: SYSTEM

 4/78   A           67.0         58.0        61.0        58.0
        B           65.0         59.0        63.0        59.0
        SYSTEM                                                                   720    716

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    */78     EflUIFfXENT:  THICKENER
              fcND DATE      4/78     PROBLEM:  CHEMICAL-RELATED PLUGGING
                            TfcE SYSTEM WAS  DOWN  DUE  TO AN EXCESS  OF  FLOCCULANT IN THE THICKENER.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    4/78     tGUIFWENT:  ABSORBER
              END DATE      4/78     PROBLEM:  CHEMICAL-RELATED PLUGGING
                            EXCESS FLOCCUlANT  IN THE THICKENER YIELDED  A HIGH SOLIDS  LEVEL  IN  THE
                            OVERFLOW AMD RESULTED IN PLUGGING PROBLEMS  IN THE ABSORBER  MODULES.
              AFFECTED MODULES: SYSTEM

  5/78   A           52.0         43.0        45.0        44.0
        B           54.0         50.0        51.0        49.C
        SYSTEM                                                                   744    7?0

        ** PROBLEMS/SOLUTIONS/COMKENTS
              START DATE    5/78     £OL>I FKENT:  THICKENER
              END DATE      5/78     PROBLEM:  CHEMICAL-RELATFD PLUGGING
                            THE SYSTEl" HAI  TAKEN OUT OF SERVICE  BECAUSE  OF CONTINUED  PROBLEMS  WITH THE
                            FLOCCULANT FEfD SYSTEM.   THE THICKENER WAS  EMPTIED TO RESTORE PROPER  FLOC-
                            CULANT BALANCfc.
              AFFECTED MODULES: SYSTEM

  6/78   A           48.0         37.0        37.0        37.0
        8           30.0         30.0        30.0        30.0
        SYSTEM                                                                   720    720

        ** PROBLEWS/SOLUTlONS/COHHENTS
              START  DATE    6/78     teUIMXENT:  PIPING
              END DATE      6/78     PROBLEM:  NOT DEFINED/SPECIFIED
                            A*  FRP PIPING  FAILURE IN THE MIST  ELIMINATOR WASH SYSTEM  OCCURRED.
              AFFECTED MODULES: SYSTEM

  7/78  A            66.0         66.0         66.0        64.0
        B            43.0         33.0         33.0        32.0
        SYSTEM                                                                   744    727

        ** PROBLEMS/SOLUTIONS/COMHENTS
              START  DATE    7/78     E6UIFKENT:  ABSORBER
              END DATE      7/78     PPOBtFM:  CHEMICAL-RELATED PLUGGING
                            OUTAGE TIME  WOS DUE  TO PLUGGING  IN THE MIST ELIMINATOR  AND  SCRUBBER PALL
                            REGIONS.
              AFFECTED  MODULES: SYSTEM  SYSTEM

  8/78  A            1F.C         20.0         20.0        18.0
        B            18.0         21.0         21.0        18.0
        SYSTEM                                                                   744    667

        ** PROBLEMS/SOLUTIONS/COMMENTS
              ST*RT  DATE    8/78     EeUIF^ENT: MIST ELIMINATOR
              END BATE      */78     PROBLEM:  CHEMICAL-RELATED PLUGGING
                            THE FORCED OU1AGE  TlflE WAS  DUE,  IN PARTt TO TIME  REQUIRED TO  REMOVE  SCALE
                            FfiOM THE MIST  ELIMINATOR.
              AFFECTED  MODULES: SYSTEM
                                                   65

-------
EPA UTILITY  f6D  SURVEY: DECEMBER 197? - JANUARY  1979
                                             SECTION  3
                     DESIGN AMD PERFORMANCE  DATA  FOR OPERATIONAL FED SYSTEMS
------------------- --- . ------------------- PERFORMANCE  DATA ------------ -- ------ — - -------- - — - --- •"
PERIOD  NODULE  AVAILABILITY CPERA6IL1TY  PLIABILITY  UTILIZATION  X REMOVAL   PER   BOILER   FfiD   CAP.
                                                                  S02  PART.  HOURS  HOURS  HOURS FACTOR
9/78
10/78
A
B
SYSTE*
A
B
SYSTEM
61.0
54.0
72.0
82.0
46.0
44.0
37.0
47.0
55.0
53.0
38.0
47.0
45.0
43.0
36.0
45. 0
 11/78
 12/73
        **  PROBLEHS/SOLUTIONS/COMMENTS
              START DATE   f 116      tflUITfENT:  ABSORBER
              END DATE     8/78      PROBLEM:  0 E SIGN -RF LATE 0 INFERIOR CONSTRUCTION  MATERIAL
                           TlfE FORCED OU1A6E  TIME  WAS  DUE. IN PART. TO TIME REQUIRED  TO REPLACE SOME
                           OF THE PING  PCN6 BALLS  IN THE MODULES.
              AfFFCTED MODULES':  SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/78      ECUIfwENT:  6AS DAMPER
              END DATE     9/78      FROBlFM:  NOT DEFINED/SPECIFIED
                           THE UTILITY  EXPERIENCED BYPASS DAMPER PROBLEMS DURING THE  PERIOD.
              AFFECTED MODULES:  SYSTEM

        **  PROSLEMS/SOLUTIONS/COMMENTS
              START DATE   8/78      EOUIfENT:  P1P1N6
              tND DATE     9/78      PROBLEM:  NOT DEFINED/SPECIFIED
                           PS08LEMS  OCCU1'»ED  RELATED TO BROKEN SLUDGE LINES AND  PLUGGING IN THE LIME
                           SLURRY FEED  LINES.
              AFFECTED MODULES:  SYSTEM
                                                                                7?0    707
                                                                                744    713

        ** PROaiEMS/SOLUTIONS/COMPENTS
              START DATE   10/78      EOUIfENT:  CAS DAMPER
              END DATE     11/78      PROBIEM: NOT DEFINED/SPECIFIED
                            DAMPER  DRIVE  IPOBLEMS WERE REPORTED BY THE UTILITY.
              AFFECTED MODULES:  SYSTEM

        ** PKOBLE.MS/SOLUTIONS/COMMENTS
              START DATE   10/78      tQUlfENT:  ABSORBER
              END DATE     11/78      PROBIEN: 1 MSTALLATION-RE LATE D MATERIALS  FAILURE
                            MINIMAL  RUPEE V LINER FAILURE MAS OBSERVED AT THE  TOP  OF  ONE OF THE
                            SCRUflBER  MODOLfS'AND JUST-AFTER-THE PRE S ATURATOR.
              AFFECTED MODULESi  SYSTEM
                                                                                720   «4Z
                                                                                744   609

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   12/78      EfiUIFHENT:  FGD SYSTEM, GENERAL
              END DATE      1/79      PROBIEMI HEATHER-RELATED COMPONENT  FAILURE
                            THE  LOW  HOURS FOR THIS PERIOD ARF ATTRIBUTED  TO  FREEZE UPS.
              AFFECTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    O/ 0      EQU1 f PENT:
              END DATE      O/ 0
                            THE  LOU  HOURS FOR THIS PERIOD ARE ATTRIBUTED  TO  FREEZE UPS.
              AFFECTED MODULES:  SYSTEM
A
B
SYSTEH
A
B
SYSTEM
43.0
84.0

6.6
33.1

29.0
74.0

.3
36.3

29.0
75.0

.3
36.6

26.0
66.0

.7
30.0

  1/79
A
B
SYSTEM
                                                                                744   602
                                                  66

-------
                                             EPA UTILITY  FCit  SURVEY: DECEMBER 1978 - JANUARY 1979
                                           SECTION I
                   DESIGN  AND  PERFORNAKE DATA FOR OPERATIONAL  FCC SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE  EMISSION  LIMITATION - N6/J
S02 EMISSION LIMITATION - NG/J
NET PLANT GENERATING  CAPACITY ~ "«
GROSS UNIT GENERATING CAPACITY - Mb
NET UNIT GENERATING  CAPACITY W/FGD - M«
NET UNIT GENERATING  CAPACITY WC/FGC - PW
EQUIVALENT SCRUBBED  CAPACITY - MW

** BOILER DATA
    SUPPLIER
    TYPE
    SERVICE  LOAD
    COMMERCIAL  SERVICE DATE
    MAXIMUM  BOILER FLUE GAS FLOW - CU.MS
    FLUE 6AS TEMPERATURE - C
    STACK HEIGHT  - fl
    STACK TOP  DIAMETER - M

**  FUEL  DATA
    FUEL TYPE
    FUEL  GRADE
    AVERAGE  HEAT  CONTENT - KJ/KG
    RANGE HEAT  CONTENT - BTU/LB
    AVERAGE  Ajh CONTENT - I
    RANGE ASH  CONTENT - X
    AVERAGE  MOISTURE  CONTEKT - X
    RANGE MOISTURE CONTENT - X
    AVERAGE  SULFUR CONTENT - X
    RANGE  SULFUR  CONTENT - %
    AVERAGE  CHLORIDE  CONTENT - *
    RANGE  CHLORIDE CONTENT - *
     FUEL  FIRING RATE - M T/H
     FUEL  FIRING RATE - MU

**  ESP
     NUMBER
     TYPE
     SUPPLIER

 **  F6D SYSTEM
     SALEABLE FRO^UCT/THfifrK AWAY PRODittT
     GENERAL PROCESS  TYPE
     PROCESS TYPF
     PROCESS ADDITIVES
     SYSTEM  SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     PARTICULATE DESIGN REMCVAL EFFICIENCY
     SO2 DESIGN REMOVAL EFFICIENCY  - %
     COMMERCIAL DATE
     INITIAL START-UP
     CONSTRUCTION  INITIATION
     CONTRACT AWARDED

 **  ABSORBER
     NUMBER
     TYPE
     INITIAL START UP
     SUPPLIER
     NUMBER  OF  STAGES
     SHELL MATERIAL
     SHELL LINER MATERIAL
     BOILER  LOAD/ABSORBER  -  X
     GAS FLOW - CU.M/S
     GAS TEMPERATURE  -  C
     LIQUID  RECIRCULATION  RATE  -  LITERS!
     PRESSURE DROP -  KPA
     SUPFRFICAL GAS VELOCITY  -  M/SEC
- X
COLUM&US 8  SOUTHERN  OHIO  ELEC.
CONESVILLE
6
CONESVILLE
OHIO
B
                (******  LB/MMBTU)
                <  1.000  LB/MMBTUJ
       43P.
      2100.0
       411.0
       375.0
       391.0
       411.0
COMBUSTION  ENGINEERING
PULVERIZED  COAL,  DRY  BOTTOM
BASE
 0/77
********        (*******  ACFM)
  146.7         <  296  F)
  ?44.          <  800  FT)
*******         (***** fT>
COAL
BITUMINOUS
 25237.

   15.10
12-19
    7.50
******
    4.67
4.2-5.1

******
  149.7
*****
                    ( 10850 BTU/LP)
                     10300-11220
                    <1*5 TPH)
COLD  SIDE
RESEARCH  COTTRELL
THROKAMAIf 'PRODUCT
WET SCRUBBING
LIME
THIOSORBIC
AIR CORRECTION  DIVISION,  UOP
BLACK  8 VEACH
FULL SCALE
NEU
   99.60
   89.50
  6/7P
  6/78
  5/75
10/74
TURBULENT  CONTACT  ABSORBER
 AIR  CORRECTION  DIVISION,
CARBON  STEEL
NEOPRENE
    60.0
   298.44
   141.1
  2394.
     1.8
     3.9
                     ( £32416 ACFp>
                     C  286 r)
                     (38000 GPR)
                     < 7.3 IN-H20)
                     < 12.8 FT/S)
                                                 67

-------
EPA UTILITY  fGO  SURVEY:  OECEKBfR 19?f - JANUARY  1979
                                             SECTION  3
                     Of.SI6N AND PERFORMANCE  DATA  f Of OPERATIONAL fCO SYSTEMS
  •*  FANS
      NUMBER

  **  VACUUM FILTER
  **  HIST ELIMINATOR
      NUMBER
      TYPE
      CONFIGURATION

  **  MIST ELIMINATOR
      NUMPER
      TYPE

  **  PUMPS
      SERVICE
      RECYCLE
      TRANSFER TANK PUMP
      MAKf-UP SLURRY PUMP
      RECYCLE TANK SLUDGE  PUfP
      M.E. WASH TANK PUMP
      RECLAIMED WATER PUMP

     TANKS
      SERVICE
      RECYCLE
      RECLAIMED WATER TANK
      SLURRY TRANSFER TANK
      SLURRY STORAGE
      M.E. WASH TANK

  ** THICKENER
      CONSTRUCTION MATERIAL
      DIAMETER - M
      OUTLET SOLIDS  - X

  ** WATER LOOP
      TYpE
      FRESH MAKEUP WATER  ADDITION - LITERS/S

  ** TREATMENT
      TYpE
      CONTRACTOR
      PRODUCT CHARACTERISTICS

  *• DISPOSAL
      NATURE
      TYPE
      LOCATION
      TRANSPORTATION
      AREA - ACRES
                                         CHEVRON
                                         HORI70NTAL
                                         ENTRAPMENT  SEPARATOR
                                                  NUMBER
                                         NUMBER

                                             1
                                             1
                                             1
                                             1
                                             1
                                         CARBON  STEEL WITH CONCRETE FLOOR
                                             44.?        (145 FT)
                                             32.5
                                          OPEN
                                             31.5
                                                         (  500 GPWj
                                          PROPRIETARY (POZ-0-TEC)
                                          ttKS
                                          73!?  SOLIDS
                                          FINAL
                                          DIKED  LANDFILL
                                          ON-SITE
                                          PIPE
                                             50.0
 	PERFORMANCE DATA	
 PERIOD MODULE  AVAILABILITY CPERABILITY ffllABlLlTY UTILIZATION
                                                          * REMOVAL
                                                          soz  PORT,
                                                          PER  BOILER   F6D    CAP.
                                                         HOURS HOURS  HOURS  FACTOR
  6/78
A
B
SYSTEM
56.0
44.0
49.0
33.0
51.0
34.0
43.0
30. C
                                                                                720   524
        ** PROULEMS/SOLUTIONS/COMMENTS
               START  DATE    6/78     EOUIFNENT: 6AS DAMPER
               END  DATE      6/78     pfrOBlFM: MECHANICAL-RELATED  COMPONENT FAILURE
                            CONTROL Or THt LOUVF.RERED DAMPER  OF  THE BfPASS SYSTEM WAS LOST.   THE
                            RESULT WAE 6ACK PRESSURE BUILDUP  THAT AUTOMATICALLY SHUT DOWN THf  BOILIR.
               AFFECTED  MODULES: SYSTEM

-------
                                              EPA  UTILITY F60 SURVEY: DECEMBER 1978 - JANUARY  1979
                                            SECTION 3
                    DESIGN  UNO  PERFORMANCE  DATA FOR OPERATIONAL F6D SYSTEMS
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY  OPERABILITY  RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 S02  PART. HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    6/78      EQUIFflENT: INSTRUMENTATION
              END  DATE      6/78      PROBLEM: NOT DEFINED/SPECIF I ED
                           SCRUFBER  CONTROLS WERE NOT OPERATING PROPERLY AND NEEDED ADJUSTMENT.
              AFFECTED  MODULES:  SYSTEM

 7/78  A            83.0         37,0        63.0        25.0
       8            70.0         19.0        13.0        13.0
       SYSTEM                                                                74*   502

       ** PROaieMS/SOLUTIONS/COMMENTS
              START  DATE    7/78      EQUIPMENT: 6AS DAMPER
              END  DAT?      7/78      PROBLEM: NOT DEFINED/SPECIFIED
                           THE LCUVefiED  CAMPER PROBLEM CONTINUED*
              AFFECTED  MODULES:  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    7/78      E8UIFMENT! PIPING
              END  DATE      7/78      PROBLEM: MECHANICAL-RELATfD COMPONENT FAILURE
                           THE FRP TRANSFER LINE FROM THE THICKENER TO THE IUCS SYSTEM RUPTURED AS A
                           RESULT OF A W/>T£R HAMMER IN THE LINE AND HAD TO BE REPAIRED.
              AFFECTED  MODULES:  SYSTEM

 8/78  A            47.0         50.0        66.0        43,0
       B            62.0         60.0        81.0        52.0
       SYSTEM                                                                744   642

        **  PBOBLEMS/SOLUTIONS/COMMENTS
              START  DATE    8/78      EGUIFMENT: PIPING
              END  DATE      8/78      PROBLEM: NOT DEFINED/SPECIFIED
                           PROBLEMS HERE ENCOUNTERED WITH THE SLUDGE LINE.  THE UTILITY REPORTS
                           THAT THIS IS  TYPICALLY A HIGH MAINTENANCE AREA.
              AFFECTED  MODULES:  SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    8/78      ECUUNENT: GAS DAMPER
              END  DATE      8/78      PROBtEM: NOT DEFINED/SPECIFIED
                           PROBLEMS WERE ENCOUNTERED WITH THE BYPASS CONTROL DAMPERS.  THE UTILITY
                           RtPORTS -TtlfrT -THIS I fr TYPICALLY A HIGH MAINTENANCE AT1EA.
              AFFECTED  MODULES:  SYSTEM

  9/78   *            55.0         50.0        53.0        49.0
        B            69.0         55.0        57.0  ,      54.0
        SYSTEM                                                                720   706'

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    9/78     EBUIFPENT: REA6ENT HANDLING
              END DATE      9/78     PROBLEM: NOT DEFINED/SPECIFIED
                           A  PROBLEM ARE/i WAS THE PLUGGING OF THE LIME SLURRY FEED LINES.
              AFFECTED  MODULES:  SYSTEM

        **  PROBLEMS/SOLUIIONS/COMMENTS
              START  DATE    9/78     EQUIPMENT: GAS DAMPER
              END  DATE      9/78     PROBtEM: NOT DEFINED/SPECIFIED
                           BY-PASS DAMPED CONTROt PROBLEMS CONTINUED THROUGH SEPTEMBER.
              AFFECTED  MODULES: SYSTEM

 10/78   A            98.0        29.0        30.0        24.0
        8            37.0        35.0        36.0        29.0
        SYSTEM                                                                744   603

        **  PR08LEMS/80LUTIONS/COMMENTS
              START  DATE   10/78     EQUIPMENT: GAS DAMPER
              END DATE     10/78     pRQBltM: NOT DEFINED/SPECIFIED
                           PROBLEMS WITH DAMPER SEALS AND 61) IDE BARS WERE  ENCOUNTERED.   THE  UTILITY
                           PLANS TO REPLACE THEM DURING THE NEXT BOILER OUTAGE.
                                                 69

-------
EPA UTILITY  F6D SURVEY; DECEMBER  1
-------
                                             EPA  UTILITY FCI) SURVEY: DECEMBER 1978 - JANUARY 1979
                                           SECTION 3
                   DESIGN  AND  PERFORMANCE  DATA  FOR OPERATIONAL FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION  -  NC/J
S02 EMISSION LIMITATION  -  NG/J
NET PLANT GENERATING CAPACITY  -  MW
GROSS UNIT GENERATING  CAPACITY  - Mh
NET UNIT GENERATING  CAPACITY W/FGD - M k
NET UNIT GENERATING  CAPACITY WO/FGt - f>W
EQUIVALENT SCRUBBED  CAPACITY -  MW

** BOILER DATA
    SUPPLIER
    TYPE
    SERVICE  LOAD
    COMMERCIAL  SERVICE DATE
    MAXIMUM  BOILER  FLUE  GAS FLOW - CU.MS
    FLUE 6AS TEMPERATURE - C
    STACK HEIGHT  -  M
    STACK TOP  DIAMETER - M

 • *  ESP
    NUMBER
     SUPPLIER

 **  MECHANICAL  COLLECTOR
     SUPPLIER

 **  PARTICULATE  SCRUBBER
     TYPE

 **  F6D  SYSTEM
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     GENERAL PROCESS TYPE
     PROCESS TYPE
     SYSTEM  SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     PARTICIPATE DESIGN  REMCVAl EFFICIENCY
     S02 DESIGN REMOVAL  EFFICIENCY  -  »
     COMMERCIAL DATE
     INITIAL START-UP
     CONSTRUCTION  INITIATION
     CONTRACT AWARDED

 ** ABSORBER
     NUMBER
     TYPE
     INITIAL START UP
     SUPPLIER
     NUMBER  OF  STAGES
     DIMENSIONS
     SHELL MATERIAL
     SHELL LINER MATERIAL
     INTERNAL MATERIAL
     GAS FLOW - CU.M/S
     GAS TEMPERATURE - C
     LIQUID RECIRCULATION  RATE - LITER/:
     PRESSURE DROP - KPA
     PARTICULATE REMOVAL EFFICIENCY - X

 ** FANS
     TYpE
     CONSTRUCTION MATERIALS
     SERVICE -  WET/DRY

 ** PUMPS
     SERVICE
                       .100  LP/MMBTU)
                       .600  LP/MMBTU>
DUOUESNg LlfcHT
ELRAMA
1-*
ELRAMA
PENNSYLVANIA
6
   43.          C
  25ft.          (
  *9t.O
  510.0
  475.0
  493.0
  510.0
    DABCOCK  AND  WILCOX
    PULVERIZED  COAL
    BASE
      0/52
    ********       (*******  ACFM)
    *******         (**** F)
       122.          (  400 FT)
    *******         (*****  FT)
      RECYCLE
      1
     RESEARCH COTTRELL
     RESEARCH COTTRELL
     S02 SCRUBBERS  ACT  AS PART.  SCRUBBERS
     THROWAWAY  PRODUCT
     WET SCRUBBING
     LIME
     CHENICO
     GIBBS AND  HILLi INC.
     FULL-SCALE
     RETROFIT
- *     99.00
        83.00
     10/75
     10/75
     12771
     12/70
     VARIABLE THROAT VENTURI
     10/75
     CHFMIcO
         1
     30 DlA. X 6C HIGH
     MILD STEEL
     CE1LCOTE
     316L SS AND CEILCOTE
       254.83        ( 540000 ACFM)
       150.6         t  303 F)
      100S.          (16000 GPM)
         7.5         (30.0 IN-H20>
        99.0
     SCRUBBER I.C.
     RUBBER LINED AND  316L SS HUBS
     WET
     NUMBER

     ****
                                                 71

-------
EPA UTILITY  F6D SURVEY:  DECEKBF.fi 197f  -  JANUARY 1979
                                              SECTION I
                      DESIGN AND PE R f ORR A r.( E  DATA FOP OPERATIONAL FED SYSTEMS
  •*  REHEATED
      TYpt                                         DIRECT  COMRUSTION

  ••  THICKENER
      NUMBER                                        2
      OUTLET SOLIDS  - X                              3?.C

  **  HATER LOOP
      TYpF                                         OPEN

  •*  TREATMENT
      TYPE                                         POr-0-TEC
      CONTRACTOR                                   1UCS
      PRODUCT  CHAPACTfRISTICS                     70? SOLIDS

  **  DISPOSAL
      NATURE                                       FINAL
      TYPE                                         LANDFILL
      LOCATION                                     OFF SITE
      TRANSPORTATION                              TRUCK
 	PERFORMANCE  DATA	
 PERIOD NODULE  AVAILABILITY OPERABIL1TY PLIABILITY UTILIZATION  X REMOVAL    PER  BOILER   FGD   CAP.
                                                                    S02   PART.  HOURS HOURS   HOURS FACTOR


  0/75  SYSTEM

        *• PROtiLEKS/SOLUTIONS/COMPIENTS
               START DATE   0/75      IfiUIFHENT:  F6D  SYSTEM,  GENERAL
               END DATE     0/75      COfiftNTS:
                            THE  FIRST ELRJKA SCRUBBER  WAS  PLACED IN SERVICE  ON OCTOBER  26, 1975.  IT
                            HAD  BEEN SCHEDULED FOR AN  EARLIER STARTUP DATE  BUT BECAUSE  OF  THE SEUERITY
                            AM)  NUMBER OF PROBLEMS ENCOUNTERED AT PHILLIPS,  STARTUP WAS DELAYED UNTIL
                            rAKIY  OF  THE PFOBLEMS AT  PHILLIPS WERE RESOLVED  AND THE MODIFICATIONS COULD
                            BE INCORPGRATEC AT BOTH  STATIONS.
               AFFECTED MODULES:  SYSTEr

        ** PROBLtKS/SOLUTIONS/COKMENTS
               START DAJE   0/75      EOUIfNENT:  F6D  SYSTEM,  GENERAL
               END DATE     0/75      CCP*W£NTS:
                            BOILER  NO. i ;AS INITIALLY CONNECTED TO THE  F6D  SYSTEM ON OCTOBER 26, 1975
                            THIS  BOILER H*S AN EOUIVALFNT  CAPACITY OF APPROXIMATELY 100 MW ANo THE
                            EMISSIONS ARf HANDLED BY ONE '-SCRUBBER -  TO  tNSURE RELIABILITY  IN THE CASF
                            OF A  SCRUBBER MALFUNCTION, TWO SCRUBBERS  ARE OPERATED AT  PARTIAL LOAD TO
                            PROTECT  THE BCILER AND TURBINE GENERATOR  AGAINST  A TRIP-OfF.
               AFFECTED MODULES:  SYSTEK

        ** PROBLEMS/SOLUTIONS/COMMENTS
               START DATE   0/75      EGUlfNENT:  F6D  SYSTEM,  GENERAL
               END DATE     2/76      COKMiNTS:
                            T*E  PC1LFR OPFRATED  CONTINUOUSLY ON THE SCRUBBER  SYSTEM THROU6H JANUARY
                            1976.  TWO MINOR OUTAGES OCURRED.  ON  FEBRUARY  4, 1976 A  SECOND POILFR WAS
                            CCUPLED  INTO 1HE SCRUBBER  COMPLEX.  PRESENTLY,  2  UNITS ARE  THE MAXIMUM THA
                            CAN  BE  TIED I MO THE SCRUBBER  PLANT.   TO  DATE,  THE UTILITY  HAS ENCOUNTERED
                            TkE  USUAL CIN
-------
                                              EPA UTILITY  FGO  SURVEY:  DECEMBER 1978 - JANUARY 1979
                                            SECTION 3
                     DESIGN  AND FERFORMhCE DATA FOP OPERATIONAL  FED SYSTEMS
...........	_	PERFORMANCE  DATA	---
PERIOD MODULE AVAILABILITY CPERAS1LITY t'f LIAE) I LIT Y UTHI7ATION   X  REMOVAL   PER  BOILER  FGD   CAP.
                                                                  SOZ  PART. HOURS HOURS  HOURS FACTOR

                           CCND ElOILfcR «*S CONNECTED ON  FEBRUARY  4. 1976.  FOUR OF THE SCRUBBER VES-
                           SELS HAVE BEEh IN SERVICE IN  VARIOUS  COMBINATIONS.  THE FIFTH VESSEL HAS
                           NCT BEEN IN SERVICE BECAUSE  IT  IS  BEING  REVISED FOR TRIAL INSTALLATION OF
                           RLBBER-LINED KtCVCLE PUMPS.
              AFFECTED MODULES: SYSTEM

11/75  SYSTEM                                                                 720

12/75  SYSTEM                                                                 11,1,

  0/76  SYSTEM                                                                                   69.5

  1/76  SYSTEM                                                                 744

       **  PROBLEMS/SOLUTIONS/COCMENTS
              START DATE   1/76     EBUIFMENT: REA&ENT  HANDLING
              £ND DATE      1/76     PPOBUM: MECHANICAL-RELATED  COMPONENT FAILURE
                           ONE OUTAGE WAT CAUSED BY A  LIME  FEEDER BELT FAILURE.
              AFFECTED  MODULES: SYSTEM

       **  PROBLEMS/SOLUTIONS/COMMENT;:
              START DATE   1/76     EeUKMENT: SCRUBBER
              END DATE      1/76     PROBLEM: MECHANICAL-RELATED  COMPONENT FAILURE
                           OkE OUTAGE WAf CAUSED BY INOPERATIVE  THROAT DAPPERS.
              AFFECTED  MODULES: SYSTEM

  Z/76  SYSTEM                                                                 696

  3/76  SYSTEM                                                                 744

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   3/76     EQUIPMENT:  FED  SYSTEM*  6ENERA|_
              END DATE     4/76     COMMENTS:
                           T*E SYSTEM  OPERATED DURIN6  THE  REPORT  PERIOD WITH TWO BOILERS COUPLED INTO
                           THE SCRUBEIIN6  SYSTEM.   REVISIONS TO THE  FIFTH SCRUBBING VESSEL HAVE BEEN
                           COMPLETED AND  OPERATIONS ARE  PROCEEDING  WITH TWO RUBBER-LINED RECYCLE
                           PliMPS.
              AFFECTED MODULES: SYSTEM

  4/76  SYSTEM                                                                 720

  5/76  SYSTEM                                                                 744

        ** PROBLEMS/SOLUTIONS/CCKMENTS
              START DATE   5/76     EQUIPMENT:  F6D  SYSTEM,  GENERAL
              END DATE     6/76     COMMtNTS:
                           ThE SYSTEM  IS  STILL  OPERATING WITH TWO BOILERS COUPLED INTO THE SCRUBBING
                           SYSTEM.  THE  1UCS  SLUDGE  FIXATION SYSTEM IS CONTINUING TO OPERATE AT THIS
                           STATION.
              AFFECTED  MODULES: SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   5/76     EOUIf'KENT:  RECYCLE PUMP
              END DATE     6/76     COMMfNTS:
                           THE FIFTH  SCRUBBING  VESSEL  WAS  TAKEN OUT OF SERVICE FOR REPAIRS AfcD MODIFI
                           CATIONS  REOUIKEO  FOR  THE  RUBBER-LINED RECYCLE PUMPS.
              AFFECTED  MODULES; SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   5/76     E6UI1MENT:
              END DATE     6/76     COMMENTS!
                           THE UTILITY IJ CURRENTLY CONDUCTING A PERFORMANCE  TEST ON THE SCRUBBING
                           SYSTEM  IN  THE  TWO  BOILER OPERATION MODE.
              AFFECTED  MODULES: SYSTEM

  6/76  SYSTEM                                                                  720

  7/76  SYSTEM                                                                  7A*



                                                  73

-------
    UTILITY F6D SURVEY: DECEMBER  1970  -  JANUARY  1979

                                            SECTION  3
                    DESIGN  AND  PERFORMANCE  DATA  FOR OPERATIONAL FGD SYSTEMS
	.	......	----PERFORMANCE  DATA-	___....——-------	..--------
PERIOD MODULE AVAILABILITY  OPERAB1LITY  PLIABILITY  UTILIIATION  X REMOVAL   PER  BOILER  FGD    CAP.
                                                                 SOZ  PART. HOURS HOURS  HOURS  FACTOR


       «• PROHLEMS/SOLUTIONS/COMMENTS
             START  DATE   7/76      EOUItMENT:  F6D  SYSTEM,  GENERAL
             END DAT?     «/76      COMMENTS:
                          THE  FIFTH  SCRU3BIN6  VESSEL  EMPLOYING TWO RUBBER-LINED RECYCLE PUMPS  HAS
                          OPERATIONAL FCR  A SHORT  PERIOD  OF TINE DURIN6 THE REPORTING MONTHS-   TWO
                          BOILERS  REMAU  COUPLED  INTO  THE  SCRUBBING SYSTEM.  THE CONSTRUCTION  OF  AD-
                          DITIONAL  LIMF STORAGE SILOS  AND  A THICKENER WILL BE REflUIRED FOR  FULL SCAl
                          OPERATION.  TfF  UTILITY  HAS  SIGNED A LETTER OF INTENT WITH IUCS FOR  A LONG
                          TERM  SLUDSE FIXATION  SYSTEM. HIGH CALCIUM LIME IS STILL BEING EMPLOYED  IN
                          THE  SCRUBBING SYSTEM.
             AFFECTED  MODULES:  SYSTEM

 8/76  SYSTEM                                                                 744

 9/76  SYSTEM                                                                 720

       •• PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE   9/76      fcSUIFMENTl  F6D  SYSTEM,  GENERAL
             END DATE     10/76      COMMtNTS:
                          OPERATIONS  AT THIS  STATION  DURING THE REPORT PERIOD PROCEEDED WITH TWO
                          BOILERS  COUPLtD  INTO  THE  5-MODULF SCRUBBING SYSTEM.  THE 5TH SCRUBBING  VES
                          SEL  WAS  OPERATIONAL  DURING  THE  REPORT PERIOD WITH THE RUBBER-LINED RECYCLE
                          PIMPS IN  SERVICE. OPERATIONS ARE STILL PROCEEDING ON AN OFEN WATER-LOOP
                          BASIS.  PART  CF  THE  THICKENER OVERFLOW IS STILL BEING DIVERTED TO THE ASH
                          PCND  AND  NOT  KCYCLED BACK  TO THE PROCESS.  BECAUSE BOTH THE BEAVER  VALLEY
                          AlsD  PRUCF  MANSFIELD  STATIONS ARE FULLY OPERATIONAL, THIS STATION  HAS  BEEN
                          RELEGATED  TO  FCAK LOAD  OPERATIONS.  GENERAL LOAD OPERATIONS ARE FULL  LOAD
                          CAPACITY  IN THE  DAYTIME  AND  50  TO 60 PERCENT LOAD REDUCTION AT NIGHT.
             AFFECTED  MODULES:  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE   9/76      E8UIFMENT:  FGD  SYSTEM,  GENERAL
             END DATE     10/76      COMMkNTSt  RESEARCH  AND  DEVELOPMENT
                          TfcSTS WERE  CONDUCTED  DURING  THE  PERIOD TO DETERMINE pARTICuLATE AND  SOZ
                          RbMOVAL  EFFICIENCIES.   SOZ  REMOVAL EFFICIENCY WAS 50 PERCENT.  PARTICULATE
                          EMISSIONS  WE HE  BEING REDUCED WELL BELOW 0.1 UP/MM BTU STANDARD (ACTUAL  RE
                          SILTS: O.OA Li/MM BTU).   THESE  RESULTS WERE BASED ON TWO BOILERS  COUPLED
                          1KTQ  THE  5  SCRUBBING  MODULFS WHILE BURNING MEDIUM-SULFUR (1.0 TO  2.8  PER-
                          CENT) COAt. TfE-  MECHANICAL  COLLECTORS AND ESP'S WF*E IN SEUVICE OlfRING  TVlt
                          TtSTS.
             AFFECTED  MODULES:  SYSTEM

10/76  SYSTEM                                                                 744

11/76  SYSTEM                                                                 720

       *» PROSLEMS/SOLUTIONS/COMNENTS
             START  DATE   11/76      EOUU1ENT:  FGD  SYSTEM,  GENERAL
             END DATE     12/76      COMMENTS:
                          THE  SCRUBBER  PKMAINED IN  SERVICE THROUGHOUT THE REPORT PERIOD WITH TWO
                          BOILERS  COUPLfcD  INTO  THE  SCRUBBING SYSTEM.  A RECYCLE PUMP EVALUATION IS
                          BEING CONDUCTFD  BY  THE  UTILITY  AT BOTH PHILLIPS AND ELRAMA STATIONS.
             AFFECTED  MODULES:  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE   11/76      EOUIfMENT:  RECYCLE  PUMP
             END DATE     13/76      PRCBtFM: MECHANICAL-RELATED MATERIALS FAILURE
                          OBSERVATIONS  CF  THE  RUBBER-LINED RECYCLE RUMPS INDICATE SOME SEVERE  ABRAS-
                          ICN  AND  GOUGING  HAVE  OCCURRED AFTER 1000 HOURS OF SERVICE TIME.
             AFFECTED  MODULES:  SYSTEM

12/76  SYSTEM                                                                 m

 1/77  SYSTEM                                                                 744

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE   1/77      EQUIPMENT:  FGD  SYSTEM, GENERAL
             END DATE     3/77      COKMtNTS:  RESEARCH AND DEVELOPMENT


                                                 74

-------
                                              FPA UTILITY FCC SURVEY:  DECEMBER  1978 - JANUARY 1979
                                            SECTION 3
                     DESIGN  AND  PERFORMANCE DAT A FOR OPERATIONAL  F6D  SYSTEMS
	.—.....	.	_	.	PERFORMANCE DATA	•	
PERIOD MODULE AVAILABILITY OPERARILITY PLIABILITY UTILIZATION  x  REMOVAL    PER   BOILER   FGO   CAP,
                                                                 S02   PART.  HOURS  HOURS  HOURS FACTOR

                           TESTING ON THJOSORBlC LIKE WAS CONDUCTED DURING  THE  PERIOD.
              AFFECTED  MODULES: SYSTEI*

       **  PROBLE«S/SOLUTIONS/COK«ENTS
              START  DATE    1/77     tOUITPENT:  FGD SYSTEM, GENERAL
              END  DATE      3/77     COMMENTS:
                           THE SCRUBBER HANT CONTINUED OPERATIONS  DURING  THE  REPORT  PERIOD  WITH TWO
                           BOILERS COIJPtLtl INTO THE SYSTEM.   INSTALLATION  OF  THE ADDITIONAL  THICKENER
                           LIME FEEDERS AND SILOS IS STILL IN PROGRESS.  FULL  COMPLIANCE OPERATION FOR
                           THIS STATION IS SCHEDULED FOR EARLY  1976.   THE  FULL  COMPLIANCE  STRATEGY
                           WILL CONSIST CF THE  FOLLOWING} 83* S02 REMOVAL  FOR  2X SULFUR COAL  UTILIZIN
                           TMOSORBIC Lff C6-12X MG), FIXATING  THE SCRUBBER  SLUDGE  WITH  THE  IUCS PCZ
                           0-TEC STABILIZATION  METHOD AND HAULING THIS MATERIAL TO AN OFF-SITE HSPOS
                           Al/LANDFILl AHF.A.  CURRENT $02 ANC PARTICULATE  REMOVAL  EFFICIENCIES AHE5C
                           AND 99 + lt, UfSIECTIVELY.  THE INTERIM  IUCS  UNIT  NOW  IN SERVICE  CONSISTS OF
                           THE OLD MOHAVf- PROTOTYPE PLUS A VACUUM FILTER.   THE  STABILIZATION  MATERIAL
                           HAS BEEN UTILIZED IN A PARKING LOT CONSTRUCTION  PROJECT.   IUCS  HAS BEEN A-
                           WARDFD A 10-YfAR CONTRACT FOR THE  CONTINUED USE  OF  THIS  SYSTEM  FOR FUTURE
                           PLANT OPERATICNS.
              AFFECTED  MODULES: SYSTEM

  2/77   s»STE»                                                                 672

  3/77   SYSTEM                                                   50.00 99.00    744

  4/77   SYSTEM                                                                 720

        **  PROBLEMS/SOLUTION S/COMMENTS.
              STAPT DATE   4/77     EOU1PKENT:  FGD SYSTEM, GENERAL
              END DATE      5/77     COMMENTS:
                           CONSTRUCTION CF TWO  120-FOOT DIAMETER THICKENERS  IS  CONTINUING.   DUE  TO TH
                           GOUGING OF THf RUBBER-LINED RECYCLE  PUMPS  DURING  THEIR  TESTING, THEY  HAVE
                           BEEN REMOVED.  THE UTILITY IS CONSIDERING  TRYING  ANOTHER  SFT OF RUBBER*
                           LINED PUMPS.   OUOUESNE LIGHT ALSO  IS  CONTINUING  EFFORTS  TO OBTAIN  ALTERNAT
                           LANDFILL AREAi FOR SLUDGE DISPOSAL.
              AFFECTED MODULES: SYSTEM

  5/77   SYSTEM                                                                 744

  6/77   SYSTEM                                                                 72t)

        *+  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/77     IOUIFMENT:  FGD SYSTEM, GENERAL
              END DATE     7/77     COMfHNTS:
                           DLfiUESNE LIGHT REPORTED THE FOLLOWING ITEMS FOR  THE  ELRAMA SCRUBBER PLANT
                           DURING THE REPORT PERIOD:
                            •TWO BOILERS  (200 MW> WERE COUPLED  INTO THE  SCRUBBER PLANT.
                            -THE INTERIM  IUCS STABILIZATION  UNIT (HflHAVE PROTOTYPE)  CONTINUED TO FIX-
                              ATE SCRUBbF-P WASTES.
                            -CONSTRUCTION OF THE TWO ADDITIONAL  THICKENERS  CONTINUED  (CONSTRUCTION IS
                            ON  SCHEDULE) .
                            -FULL PLANT COMPLIANCE IS PROJECTED  FOR FEBRUARY  1978.
                            -S02 REMOVAL  EFFICIENCY IS APPROXIMATELY  SOX.
                            -ELRAMA IS OPERATING IN A BASE/INTERMEDIATE  LOAD  MODE  (Full LOAD  DAYTIME/
                              HALF LOAD NIGHT-TIME).  1976  CAPACITY  FACTOR  WAS  69.5X.
              AFFECTED MODULES: SYSTEM

  7/77   SYSTEM                                                   50.00         744

  8/77   SYSTEM                                                                 744

        *«  PROBLEMS/SOLU1IONS/COMMENTS
              START DATE   8/77     EOUIfMENT:  FGD SYSTEM, GENERAL
              C-ND DATE     9/77     COMMfNTS!
                           THE  TWO  ADDITIONAL THICKENERS WERE COMPLETELY INSTALLED.  THE  IUCS SYSTEM
                           WAS  UPGRADED.  END OF CONSTRUCTION IS PROJECTED FOR FEBRUARY 197*.  F(lLL
                           PLANT COMPLIANCE  IS  PROJECTED FOR  APRIL  1978*
                                                  75

-------
EPA UTILITY FtD SURVEY:  DECEMBER  1978  - JANUARY 1979
                                            SECTION 3
                     OFS1GN  AND  PERFORMANCE DATA FOR OPERATIONAL FGD SYSTFMS
	PERFORMANCE; DATA	
PERIOD MODULE  AVAILABILITY  OPERA9ILITY ffLIA6ILITY UTILIZATION
                                                          X  REMOVAL    PER   BOILER  FGB   CAP.
                                                          S02   PART.  HOURS HOURS  HOtlliS FACTOR
              AFFECTED  MODULES: SYSTEM
  9/77   SYSTEM

 10/77   SYSTEC
 11/77
                                                                       720

                                                                       744
      START DATE  10/77     EOUKCENT:  VALVES
      tND DATE    10/77     PROBIEM: MECHANICAL-RELATfO MATERIALS  FAILURE
                   MODULE 101 HAS UNAVAILABLE OCTOBER 4 DUE  TO  A PLEED  VALVE  LEAK AMD WAS TA-
                   KEN OUT OF SERVICE AT THE END OF  THE MONTH  FOR  CLEANUP.
      AFFECTED MODULES: 101

** PROBLEMS/SOLUT10NS/COMMENTS
      START DATE  10/77     [OUIfMENT:  FfiD SVSTENi  GENERAL
      END DATE    10/77     COMMNTS:
                   HCDULE ?01 WAJ AVAILABLE FOR THE  ENTIRE MONTH.
      AFFECTiD MODULES: 201

** PRO&LEMS/SOLUTIONS/COMWENTS
      START DATE  10/77     f GUI I'HENT!  FAN
      END DATE    10/77     PROBLEM: MECHANICAL-RELATFD MATERIALS  FAILURE
                   MCDULE 301 ANt 401 HAD OUTA6ES IN OCTOBER RESULTING  FROM A RUBBER LIKING
                   FAILURE ON AN I.D. FAN.
      AFfrCTED MODULES: 301    4(1

** PROBLEMS/SOLUTICNS/COMMENTS
      START DATE  10/77     fOUIfHENT:  RECYCLE PUMP
      END DATS    11/77     ppCEUEMl MECHANICAL-RELATED COMPONENT  FAILURE
                   MCDULE SOI EXPERIENCED RECYCLE PuKP OUTAGES  IN  LATE  NOVEMBER.
      AFFECTED MODULES: 501

** PROBLEMS/SOLUTIONS/COMMENTS
      START DATE  10/77     EOUITMENT:  F6D SYSTEM,  GENERAL
      END DATE    11/77     COKWlNTS:
                   UtV RUBBER LI FED WORMtN RECYCLE  PUMPS  WERE  INSTALLED.  THE LIME HANDLING
                   SYSTEM INSTALLATION  WORK CONTINUED.  THE  LAST TUO TOILERS  ARE EXPECTED TO
                   BE TIED INTO  1HE FGD SYSTEM BY JANUARY 1978.
      AFFECTED MODULES: SYSTtM

** PROuLEMS/SOLUTlONS/COMMENTS
      START DATE  10/77     EOUIPMENT:  BOILER-RELATED
      END OATE    11/77     COMMENTS:
                   TLBE LEAKS fOfCED A  BOILER OUTAGE IN NOVEMpER.
      AFFECTED MODULES; SYSTEM

101
2P1
301
401
 501
SVSTtM                                                                 720

** PROULEMS/SOLUTIONS/COMMENTS
      ST*RT DATE  11/77     ESUITMENT:  FGD SYSTEM,  6ENERAL
      END DATE    11/77     COMMENTS:
                   MODULE 101, 2C1 AND  401 HAVE LOW OPERATIONAL HOURS BECAUSE ONLY TkO BOILER
                   ARE TIED INTO THE FGD SYSTEM TO  DATE.
      AFFECTED MODULES: 101    2C1    401

** PROBLEMS/SOLUTIONS/COHMENTS
      START DATE  11/77     EOUI^WENT:  SLUDGE  DISPOSAL
      END DATE    11/77     COPiMtMTS:
                   TK SLUDGt HANDLING  SYSTEM  IS  FUNCTIONING PROPERLY ANP IS NOW  IN  FULL  SER-
                   VICE.
      AFFECTED MODULES: SYSTEM
12/77   SYSTEM
                                                                               744
                                                 76

-------
                                              EPA UTILITY FCC SURVEY:  DECEMBER  1978  - JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL FED SYSTEMS
........—— — -._.„_.._.	.	-----PERFORMANCE DATA-—-	........	...
PERIOD NODULE AVAILABILITY  OPERA01LITY H:LIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FGD   CAP.
                                                                 SO?   PART.  HOURS  HOURS   HOURS FACTOR


       t* PR06LEMS/SOLUTIONS/CCMMENTS
             START  DATE   12/77     EOUIfHENT: RECYCLE PUMP
             END  DATE      1/78     PROBLEM: MECHANICAL-RELATED COMPONENT  FAILURE
                           DURING m PEMOD A NEW WORKER RECYCLE  PUMP  INSTALLED IN  NOVEMBER  EXPERI
                           EMCED JACK SHAFT BEARING PROBLEMS RESULTING  IN  REMOVAL  0F  SCRUBBER TRAIN
                           SCI FROM SERVICE.
             AFFECTED  MODULES: 501

       ** PROHLEMS/SOLUTIONS/CONMENTS
             START  DATE   12/77     EQUIPMENT: FGD SYSTEM, GENERAL
             END  DATE      1/78     COMMITS:
                           BOILER NO. 4 l>AS CONNECTED* ADDING AN ADDITIONAL  176 MW OF FLUE  GAS LOAD  T
                           THE FGD SfStf.
             AFFECTED  MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE   12/77     ECUIFHENT: SLUDGE DISPOSAL
             END  DATE      1/7B     COMMENTS:
                           THE IUCS SLUDCE DISPOSAL FACILITY IS IN SERVICE PRODUCING  GOOD PRODUCT.
                           LOW LOAD AND A COAL STRIKE HAVE HAMPERED GOOD SCRUBBER  OPERATIONS.  THERE
                           IS SOME OUTA6I  TIME SCHEDULED FOR MARCH.
              AFFECTED  MODULES; SYSTEM

  1/78   101
        201
        301
        401
         SOT
        SYSTEM                                                                  744

  2/78   101
        201
        301
        401
         sot
        SYSTEM                                                                  672

        **  PROBLEMS/SOLUTIONS/CQMMENTS
              START DATE-  2/7fl     tOUI F»ENT: FSB' SYSTEM* GENER AL
              END BATE     3/78     COMMENTS:
                           THE  SYSTEM WAS SHUTDOWN ON FEBRUARY  11  AS  A  RESULT OF A COAL  SHORTAGE.
                           BOILERS 1, 2 fND 4 ARE  NOW COMPLETELY CONNECTED TO THE  FGD SYSTEM.  POILER
                           3  IS UNDEREOIfG AM EXTENSIVE  OVERHAUL AND  WILL  BE CONNECTED TO THE SYSTEM
                           IK LATf APRIL.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   2/78     EOUIfMENT: GAS DAMPER
              END DATE     3/78     PROBLEM: DESIGN-RELATED  INFERIOR  CONSTRUCTION  MATERIAL
                           BOILER  EXIT DAMPERS WERE LINED WITH  316 SS ON AREAS  OF  HIGH  EROSION CAUSED
                           BY  FLYASH  IMPINGEMENT.
              AFFECTED MODULES: SYSTEK

        **  PftOBLEMS/SOLUTIONSSCOMMENTS
              START DATE   2/78     EOUI P!»ENT: EXPANSION JOINT
              END DATE     3/78     PROBLEM: DESIGN-RELATED  INFERIOR  CONSTRUCTION  MATERIAL
                           EXPANSION  JOINTS IN THE UPSTREAM  DUcTkORK  WERE  SHIELDED BY METAL PLATES
                           WHICH WERE WELDED AT  ONE END. EXPANSION JOINTS  IN THE  DOWNSTREAM  pUcTWORK
                           WERE COMPLETELY REPLACE.   THE DOWNSTREAM DUCTWORK WAS RELINED  WITH
                           CEILCOTE.
              AFFECTED MODULES: SYSTEM

        •*  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   2/78     EflUIfflENT: ABSORBF.R
              END DATE     3/78     COMMENT: PREVENTIVE  MAINTENANCE SCHEDULED UNIT OUTAGE
                           MODULE  401  INTERNALS  WERE  CLEANED  AND  SOME HOLES  IN THE UPPER CONICAL RE-
                                                  77

-------
EPA UTILITY FGD SUSVFY:  DECtM&ER  197f  - JANUARY 1979
                                            SECTION 3
                     DES16N  AND  PERFORMANCE  DATA FOR OPERATIONAL FCD SYSTEMS
                                           PERFORMANCE DATA
PERIOD  MODULE  AVAILABILITY CPER.BILJTY ^LIABILITY UTILIZATION  ««"OA         •««j|«
                           GJON WERE REPAIRED-
              AFFECTED  MODULES: 401
  3/73   101
        301
        401
         501
        SYSTEM                                                                  744

        **  PROBLEMS/SOLUT1ONS/COMMENTS
              START DATE   4/78     ESU1KWENT: FGD SYSTEM, GENERAL
              gNo DATE     5/78     COMMENTS:
                           OLRIMG THE APflL-MAY PERIOD BOILER NUMBER 3 WAS STILL BEING  OVERHAULED.
                           FED SYSTEM COtSTRUCTION WAS COMPLETED AND PRELIMINARY TESTING  VERIF1FD SYS
                           TEH S02 Rtl«OV*L EFFICIENCY.
              AFFECTED MODULES: SYSTEM

  4/7P   SYSTEM                                                                  720

  5/7S   SYSTEM                                                                  7**    547

  6/78   SYSTEM                                                                  720    492

        **  PROULEMS/SOLUTIONS/COHWENTS
              START DATE   6/78     fc(5UIr"ENT: ABSORBER
              END DATE     7/78     COKMtNT: PREVENTIVE MAINTENANCE SCHEDULED  UNIT  OUTAGE
                           NODULE 301 HA; PULLED OFF FOR A MAJOR CLEANING  DURING THE  PERIOD.
              AFFECTED MODULES: 301

        »*  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/78     EGU1FPENT: MIST ELIMINATOR
              END DATE     7/78     pfOSUM: CHEMICAL-RELATED PLUGGING
                           MIST ELIMINATE PLUGGING WAS EXPERIENCED AS A  RESULT  OF  LOW  PH.
              AFFECTED MODULES: SYSTEM

        **  PRObLEMS/SOLUTlONS/COMMENTS
              START DATE   6/78     EOUIf-»ENT: REAGENT MAUDLINS
              HMD DATE     6/78     FRGBUM: NOT DEFINED/SPECIFIED
                           T»,e CHKONIC INABILITY TO CONTROL  CHEMISTRY    is  DiRrcrcY  RELATEB TO em
                           PULD-UP IN TH LIME HANDLING AND SLURRY PREPARATION  SYSTEM.
              AFFECTED MODULES: SYSTEM

        *«  PR08LEMS/SOLUTIONS/COMMENTS
              START DATE   6/78     fGUIFMENT: F6D SYSTEM, GENERAL
              END DATE     7/7$     COMMITS:
                           THE UTILITY IS CURRENTLY STUDYING WAYS  TO TIGHTEN THE WATER  BALANCE BY US-
                           1*6 THICKENER SUPERNATANT INTERMITTENTLY WITH  CLEAR SERVICE  WATER fO* THE
                           MIST ELIMINATES.   A COMPLIANCE TEST  SHOULD  TAKE  PLACE  DURING THE NEXT RE-
                           PORT PERIOD.
              AFFECTED MODULES: SYSTEM

  7/78   SYSTEM                                                                  744    662

  8/78   SYSTEM                                                                  744    678

        **  PROiLEMS/SOLUTIONS/COMMENTS
              START OATE   8/78     EQUItMENTt ABSORBER
              tND DATE     9/78     COMMENT: PREVENTIVE MAINTENANCE  SCHEDULED UNIT OUTAGE
                           DLRING AUGUST, MODULES  3D1  AND  501  WERE  TAKEN  OOWN FOR  CLEANING.
              AFFECTED MODULES: 301    SC1

        **  PRObLEMS/SOLUTlONS/COMMENTS
              START OATE   8 /78     EflUIfENT: FAN
              END DATE     9/78     PRORiEft: MECHANICAL-RELATED  MATERIALS FAILURE
                           RUBBER LIKING ON THREE  FAN  HOUSINGS  WAS  REPAIRED.
              AFFECTED MODULES: SYSTEM
                                                  78

-------
                                              fPA  UTILITY F6t SURVEY: DECEMBER 1978 - JANUARY 1979
                                            SECTION 3
                    DESIGN  AMD  PERFORMANCE  DATA FOX OPERATIONAL FGD SYSTEMS
.	.	..	..			PERFORMANCE DATA	--
PERIOD MODULE AVAILABILITY  GPERABIL1TY  ^LIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGD   CAP.
                                                                 502  PART. HOURS HOURS  HOURS  FACTOR
• •*•••• «••••«•« «•••»••«•«»••••••  • •««•«!»••«••*»  • V«**I«*«»IBM • »•««••••••• H • • » «•«• • «»«<*• <••••» B v V* • W  •••tOTMW

       ** PR08LEMS/SOLUTIONS/COMMENTS
              START  DATE   A/78      EQUIPMENT: REAGSNT HANDLING
              END  DATE     9/78      PROBLEM: PLUGGING. OTHER
                          IT  U#S NECESS'KV TO SHUT DOWN THE tIME MIXING BASIN IN ORDER TO CLEAN OUT
                          EXCESSIVE CRI1 AND SOLIDS BUILD UP.
              AFFECTED MODUltS:  SYSTEM

 9/78  SYSTEM                                                                 720    664

 10/7S  SYSTEM                                                                 744

 11/71!  SYSTEM                                                                 720

 12/78    101                                             92.?
         201                                             71.2
         301                                             85.2
         401                                             6f>.3
         501                                             75.8
       SYSTEM                                                    .00         744    707

       «.  PROBLEMS/SOLUT10NS/COMIHENTS
              START DATE  12/78     Cdtll fHENTc FGD SYSTEM, GENERAL
              END DATE    12/7R     CCKM'NTS:
                           A COKPLIAkCE  1EST WAS RUN  IN DECEMBER WHICH SHOWED THE UNITS TO PE IN
                           COMPLIANCE.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  12/7S     EfiUHKENT: SLUDGE DISPOSAL
              END DATE     1/79     COMMITS:
                           THf UTILITY HtS  STARTED HAVING  SLUDGE OFF SITE TO AM  AREA ABOUT 10 MILES
                           A HAY.
              AFFECTED MODULES: SYSTtM

  1/79  101                                             40.1
        201                                             91.9
        301                                             59.9
        401                                             100.0
         5fl1                                            96 •*
        SYSTEM                                                                744    641
                                                  79

-------
FPA UTILITY  FUD SURVEY: DECEMBER  197f - JANUARY  1979
                                              SECTION  3
                     DESIGN  AND  PERFORMANCE  DATA  FOR  OPERATIONAL FGD SYSTEMS
 COMPANY  NAME
 PLANT  NAMF
 UNIT  NUMBFH
 CITY
 STATE
 REGULATORY  CLASSIFICATION
 PARTICULATE EMISSION  LIMITATION - N6/J
 S02  EMISSION LIMITATION  - hG/J
 NET  PLANT GENERATING  CAPACITY - MW
 GROSS UNIT  GENERATING CAPACITY - Mb
 NET  UNIT GENERATING  CAPACITY U/FGD - Mv
 NET  UNIT GENERATING  CAPACITY WO/F6D -  >V
 EQUIVALENT  SCRUPBFD  CAPACITY - MW

 *« 60ILFR DATA
      SUPPLIER
      TYPE
      SERVICE LOAD
      COMMERCIAL  SERVICE DATE
      MAXIMUM BOILER  FLUE  GAS FLOW - fU.*/S
      FLUF GAS TEMPERATURE  - C
      STACK HE IGHT  -  M
      STACK TOP  DIAMETER - M

  ** FUEL DATA
      FUEL TYPE
      FUEL GRADE
      AVERAGE HEAT  CONTENT - K J /KG
      RANGE HFAT  CONTENT - BTU/LB
      AVERAGE ASH CONTENT  - %
      RANGE ASH  CONTENT -  X
      AVERAGE MOISTURE  CONTENT  - Z
      RANGE MOISTURE  CONTENT -  X
      AVERAGE SULFUR  CONTENT -  T
      RANtE  SULFUR  CONTENT - 5!
      AVERAGE CHLORIDE  CONTEKT  - X
      RAN6E  CHLORIDE  CONTENT -  t.
      FUEL FIRING RATE - « T/H
      FUEL FIRING RATE - MH

  «* ESP
      NUME-ER
      SUPPLIER
      PARTICULATE DESIGN REMOVAL EFFJC1EKY

  ** MECHANICAL  COLLECTOR
      NUH8ER
       SUPPLIER

  ** FGD  SYSTEM
       SALEABLE  PRODU<;T/T HR OW AUA Y PRODUCT
      GENERAL PROCESS TYPE
      PROCESS TYPE
       SYSTEM  SUPPLIER
      A-E  FIRM
      DEVELOPMENT LEVEL
      NEy/RETROFIT
      PARTICULATE DFSIGN REMOVAL EFFICIENCY
      S02  DESl&N REMOVAL EFFICIENCY  -  i
       INITIAL START-UP
      CONSTRUCTION  COMPLETION
      CONSTRUCTION  INITIATION
      CONTRACT  AWARDED
       STARTED REQUESTING BIDS
      STARTED PREL1MINAY DES16N

  ** ABSORBER
      NUMBER
      TYPE
      INITIAL START UP
      SUPPLIER
      NUHPER  OF  STAfES
      DIMENSIONS
      SHELL  MATERIAL
      SHELL  LINER MATERIAL
      INTERNAL  MATERIAL
                   .080 LB/MMBTU)
                   .6CO LB/MMBTU)
DUQUESNE LHHT
PHILLIPS
1-4
SOUTH HEIGHT
PENNSYLVANIA
B
   34.
  25P-
  587.0
  410.0
  ?77.0
  387.0
  410.0
FOSTF R-WHEFLER
DRY POTTOM,  PULVERIZED COAL
BASE
**/**
  P73.01        (1850000 ACFM)
  182.2         « 3" F)
  104.          « 340 FT)
*******         (*****  FT)
COAL
***** *
 26400.

   1ft.20
******
* **** ** *
                ( 11350 BTU/LB)
                 * *****
    ?.oo
1 .0-2.8
********
                (*** TPH)
RESEARCH  COTTRELL
    80.0
RESEARCH-COTTRELL
THROwAwAY PRODUCT
WET  SCRUBBING
LIME
CHEMICO
GIBBS  AND HILL
FULL-SCALE
RETROFIT
    99.00
    83.00
  7/73
  7/73
12/71
  7/71
10/70
1?/69
 VARIABLE THROAT  VENTURI
  7/73
 CHEMIcO
     1
 45 DIA- X 5C HUH
 MHO STEEL
 CEILCOTE
 316L SS AND CEILCOTE
                                                    80

-------
                                             EPA UTILITY FGD SURVEY: DECEMBER  1978 - JANUARY 1979
                                           SECTION  3
                   DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL FED SYSTEMS
   NOIILE  TYPE
   6AS  FLOW  - CU.R/S
   GAS  TEMPERATURE - C
   StiPERFlCAL 6AS VELOCITY  -  M/SEC
   PARTICIPATE OUTLET LOAD- G/CU.M
   PARTICULATE REMOVAL  EFFICIENCY -
   S02  INLET CONCENTRATION  -  PPM
TANGENTIAL,  BULL  NOZ?LE
  25S.13
  171.1
   12.2
     .1
   9D.O
 1400
<  547000 ACFM)
<   340 F)
<  40.0 FT/S)
(   .040 GR/SCF)
    NUMBER
    TYPE
    INITIAL START UP
    SUPPLIER
    NUMBER OF STAGES
    DIMENSIONS
    SHELL MATERIAL
    SHELL LINER MATERIAL
    INTERNAL MATERIAL
    NOZZLE TYPE
    6*S FLOW - CU.H/S
    6AS TEMPERATURE  -  C
    SOPERFICAL GAS VELOCITY - M/SEC
    PAHTICULATE OUTLET LOA6- G/CU.H
    PARTICULATE REMOVAL EFFICIENCY - *
    S02 INLET CONCENTRATION - PPM
VARIABLE  THROAT VENTURI (IN SERIES  WITH  101)
 7/73
CHEMIcO
    1
45 DIA. X  5C  HIGH
MILD  STEEL
CEILCOTE
316L  SS AND  CEILCOTE
TANGENTIAL,  BULL NOZZLE
  25S.13
  171.1
    12.2
      .1
    90.0
 1400
( 547000 ACFK)
«  340 F)
< 40.0 FT/S)
(  .040 GP/SCF)
** FANS
    NUMBER
    TYPE
    CONSTRUCTION  MATERIALS
SCRUBBER  1.0.
316L  SS; NATURAL RUBBER LINED  HOUSING
** MIST ELIMINATOR
    NUMBER
    TYPE
    PRESSURE  DROP - KPA
  8
CHEVRON
      .5
( 2.0 1N-H20)
** PUMPS
    SERVICE
    RECIRCULATION
    THICKENER OVERFLOW
    THICKENER UNDERFLOW
    LIME  SLURRY
    LIME  SLUKRY
-------
FPA UTILITY  FbO  SURVFY:  DECEMBER 197t - JANUARY 1979
                                            SECTION 3
                     DESIGN AND PF R FORM A fvC E DATA FOR OPERATIONAL  FED  SYSTEMS
 ** DISPOSAL
      NATURE                                      FINAL
      TTPE                                        LANDFILL
      LOCATION                                    OFF-SITE
      TRANSPORTATION                             TRUCK
	PERFORNANCF DATA	"	-----
PERIOD  MODULE  AVAILABILITY OFECAMLIIV (•FLiAt.iiiTY UTILIZATION  x REMOVAL    PER   BOILER  FGO   CAP.
                                                                 S02  PART.  HOURS  HOURS  HOUfiS FACTOR


  0/73   SYSTEM

        ••  PR06LE!«S/SOLUTIONS/COM!»ENTS
              START DATE   0/73     £6UIH«ENT: F6D SYSTEM, GENERAL
              END DATE     0/75     COHMfMTS:
                           DETERMINATION OF THE AVAILABILITY OF  THE PHILLIPS SYSTEM  HAS BEEN DIFF-
                           CILT.  UNTIL flL BOILERS WfRE CONNECTED TO THE  SCRUBBERS* THERE WAS AT
                           LEAST ONE SPA f-E TRAIN AND AS MUCH AS  100 PERCENT  SPARE  SCRUBBER CAPACITY.
                           TtEREFOREi HAVING A TRAIN OUT OF SERVICE FOR MAINTENANCE  DID NOT REDUCE TH
                           CAPABILITY OF THE SCRUBBF.R SYSTEM.  UNTIL ALL SIX BOILERS WERE CONNECTED,
                           MEANINGFUL AVAILABILITY FACTORS COULD NOT BE COMPUTED*  ON MARCH 17, 1975,
                           ThE SIXTH POIIFR WAS CONNECTED, AND ALL FOUR SCRUBBER TRAINS WERE REOUIRED
                           TO BE IN SERVICE.  OPERATION IN THAT  MODE CONTINUED  UNTIL AUGUST 4, 1975,
                           WHEN THE NO. >' BOILER MAS REMOVED FROM THE SCRUBBER  SYSTEM BECAUSE THE PH
                           LEVEL COULD NCT BE MAINTAINED AND DEPOSITS BECAME UNMANAGEABLE TO THE POIN
                           THAT SCRUBBER OUTAGES UERE REDUCIN6 GENERATING  CAPABILITY OF THE STATION.
              AFFECTED MODULES: SYSTEM

        •*  PROULEMS/SOLUTIONS/COMMENTS
              START DATE   0/73     teUHWENT: FGD SYSTEM, GENERAL
              END DATE     0/75     COMM'.NTS:
                           STARTUP Of A IORTION OF THE PHILLIPS  SCRUBPER SYSTEM BEGAN JULY 1973.
                           SEVERAL PROBLEMS THEN DEVELOPED IK THE FORM OF  EROSION  OF FANS AND THE LIM
                           Ft-ED SYSTEM C1USIN6 OUTAGES Of THE SCRUBBER SYSTEM.   AFTER AN EXTENDED
                           OUTAGE, THE SCRUBBER SYSTEM WAS RETURNED TO SERVICE  IN  MARCH 1974.  THE
                           SYSTEC HAS BE'K OPERATING CONTINUOUSLY SINCE THAT TIME  WITH VARIOUS NUMBER
                           OF BOILERS CONNECTED TO THE SCRUBBER  SYSTEM AND SCRUBBER  TRAINS IN SERVICE
              AFFECTED MODULES! SYSTEM

  7/73   smii»                   28.fl        81,0                               744           232

  8/73   SYSTEM                                                                  744

  9/73   SYSTEM                                                                  7ZO

10/73   SYST£l"l                                                                  744

11/73   SYSTEM                                                                  7JO

12/73   SYSTEM                                                                  744

  1/74   SYSTEM                                                                  744

  2/74   SYSTEM                                                                  672

  3/74   SYSTEM                                                                  744

  4/74   SYSTEM                                                                  720

  5/74   SYSTEM                                                                  m

  6/74   SYSTEM                                                                  7?Q

  7/74   SYSTEM                                                                  744

  8/74   SYSTEM                                                                  74<

  9/74   SYSTEM                                                                  720

10/74   SYSTEM                                                                  744
                                                 82

-------
                                              EPA UTILITY  FGO SURVEY:  DECEMBER  1978  - JANUARY 1979
                                            SECTION 3
                     DESIGN  AND PERFORMANCE DATA FOR OPERATIONAL  FGD  SYSTEMS
	_	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY OPEPABIHTY PLIABILITY UTILIZATION
                                                                  X  REMOVAL    PER   BOILER  FGD   CAP.
                                                                  S02   PART.  HOURS HOURS  HOURS FACTOR
11/74

1 2/7*

 1/75

 2/75

 3/75

 A/75

 5/75

 6/75

 7/75
SYSTEM

SYSTEM

SYSTEM

SYSTEM

SYSTEM

SYSTEM

SYSTEM

SYSTEM

101
201
301
401
SYSTEM
.00
720

744

744

672

744

720

744

720
                                                                               744    506
        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   7/75     EQUIPMENT:  F6D  SYSTEM,  6ENERAL
              END DATE     7/75     CCKM ENTS:
                           THE FOURTH FGt  TRAIN  AND  SIXTH  BOILER  HERE  TIED  IN  ON  MARCH  17,  1975.
                           TICULATE TESTS  IN MAY SHOWED  OUTLET  LOADINGS  OF  0.04 LB/MULION  BTU«
              AFFECTED MODULES:  SYSTEM
                                                                                           PAR
        «* PROULEMS/SOLUT10NS/COMMENTS
              START DATE   7/75      tfiUI PMENT:  SCRUBBER
              END DATE     7/75      COMWfNT:  PREVENTIVE  MAINTENANCE SCHEDULED  UNIT  OUTA6E
                           THE J-STA6E  TtAIN  HAS  BEEN  OUT OF SERVICE FROM JUNE  19 FOR GENERAL CIEANXN
                           AhD REPAIR OF  A  LEAK  IN  THE FIRST-STAGE SCRUBBER.
              AFFECTED MODULES:  SYSTEM
  6/75  301
        401
        101-
        SYSTEM
                                                                       744   ««9
        ** PROeLEMS/SOLUTJONS/COMMENTS
              START DATE    8/7$      I.OUUKINT:  SCRUBBER
              END DATE      ft/75      PROB if M :  N OT D E FINED/SPIC1 FI EC
                            SCRURBIR  UNAVAILABILITY  FORCED RElUKNlNS BOILER   TO THE SCRUBBER BY-
                            PASS  PATH IN  CPOER TO PRIVfNT LOSS Of iOILfR CAPACITY.
              AFFECTED MODULES:  SYSTEM

        *» PROHEPS/SOLUTIONS/COMMENTS
              START DATE    S/75      tOUIt^ENT:  F6D  SYSTEM, GfcKERAL
              END DATE      S/75      PROBlfM:  CHEMICAL-RELATED PLIJ66IN6
                            PLU6G1N6  AND  MAINTENANCE  PROBLEMS HAVE IEEN ENCOUNTERED.
              AFFECTED MODULES:  SYSTEM

        ** PROSLEMS/SOLUTIONS/COMMENTS
              START DATE    S/7S      I6U3FHINT:  RECYCLE PUMP
              END DATE      1/75      PROPUMj  NOT DEFINED/SPECIFIED
                            {VALUATION OF  VARIOUS RECYCLE PUMPS IS CONTINUING.
              AFFECTED MODULESi  SYSTEM
  9/75  101
        201
        301
        401
        201
        SYJTtK
                                                                        720   519

-------
FPA UTILITY  FGD  SURVEY: DECEMBER 197f  -  JANUARY 1979
                                             SECTION 3
                     DESIGN AND PERFORMANCE  DATA FO* OPERATIONAL FED  SYSTFMS
	PEfif ORMANCF DATA	
PERIOD  MODULE  AVAILABILITY CPEBAE1L1TY  ^LIABILITY UTILIZATION  * REMOVAL    PER  BOILER  FGD    CAP.
                                                                  S02   PART.  HOUPS HOURS  HOURS  FACTOR


10/75   101
        201
        301
        401
        SYSTEM                                                                   744   619

        *«  PRODLEMS/SOLUTICMS/COMMENTS
              START DATE  10/75      EQUIfENT:  FGD SYSTEM, GENERAL
              fcNO D'TE    10/75      COMKINTS: RESEARCH AND DEVELOPMENT
                            IK OCTOBF&  19/5,  PHILLIPS INITIATED THIOSORBIC  LIME  SCRUBBING IN  THEIR
                            S1N6LI-STACE  VCDULF.S  ON AN EXPERIMENTAL BASIS.   THE  PURPOSE IS TO STUDY
                            COMPLIANCE  FEASIBILITY, SO? REMOVAL EFFICIENCY,  AND  QUALITY OF THE SLUDGf
                            GENERATED BY  1HE  SINGLE-STAGE MODULES.
              AFFECTED MODULES:  SY$TtM

11/75   101
        201
        301
        401
        SYSTEM                                                                   720   468

12/75   101
        201
        301
        401
        SYSTEM                                                                   744   463

        **  PROOLEMS/SOLUTIONS/COMMENTS
              START DATE  12>75      fOUIfMENT:  F6D SYSTEM, GENERAL
              END DATE    12/75      CCMMtNTS;
                            THE UTILITY  CONCLUDED THE THIOSOREIC  LIME  TESTING PR06RAM IN KID-DECEMBER.
                            FCUR  BOILtRE  4ERE COUPLED TO THE SCRUBBING SYSTEM DURING THE RUN.  THE
                            UTILITY  IS  NOU ANALYZING THE DATA GENERATED  DURING THE TEST PROGRAM.   THF
                            SCRUBBERS  HAVL BEEN  PUT BACK ON REGULAR LldE.   NO UNUSUAL PROBLEMS UERE  EN
                            COUNTERED  DURJM6  THE  TEST RUN.
              AFFECTED MODULES:  SYSTEM

  1/76   101
        201
        301
        401

        SYSTEM       72.0                                                        744   493

        *«  PROdLEMS/SOLUTIONS/COfWENTS
              ST*RT DATE    1/76      EOUIFMENT:  F6D SYSTEM, GENERAL
              END DATE      1/76      COMMENTS:
                            THE 2.5-MONTH T£ST F'ROGR«M WITH THIOSORBIC L IMF  INCLUDED 1612 HOURS  ON  ONE
                            TRAIN AND  130' HOURS  ON ANOTHER TRAIN.  RESULTS  INDICATE THAT THE RE6UIRED
                            DEGREE OF  SCi2 REMOVAL (83 PERCENT)  CAN  BE  OBTAINED WITH AN M60 CONTENT  OF
                            8-10  PERCENT  IN  THE  L1«E WITH SINGLE-STAGE SCRUBBING.
              AFFECTED MODULES:  SYSTEM

  2/76   101
        201
        301
        401
        SYSTEM                                                                   696   435

  3/76   101
        201
        301
        401
        SYSTEM                                                                   744

  4/76   SYSTEM                                                                   720

-------
                                                EPA  UTILITY FED SURVEY:  DECEMBER 1976 - JANUARY  1979
                                             SECTION  3
                     DtSIGN  AND  PERFORMANCE DATA  FOR  OPERATIONAL F6D SYSTEMS
	.....	_	PERFORMANCE DATA	......	-	
PERIOD BOODLE AVAILABILITY  OPERABIL1TY  RELIABILITY  UTILIZATION  X  REMOVAL    PER  BOILER  F6D    CAP.
                                                                   S02   PART. HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUT10NS/COMMENTS
              START DATE    4*76     E«UIH
-------
FPA UTILITY F6D SUPVEY:  DECEMBER  197£  - JANUARY 1979
                                            SECTION 3
                     DESIGN  AND  PERFORMANCE  DATA FOR OPERATIONAL F£D SYSTEMS
	PERFORMANCE DATA--	•	•	
PERIOD MODULE  AVAILABILITY  OPERABIL1TY  PLIABILITY UTILIZATION  * REMOVAL   PER  BOILER   FGO    CAP.
                                                                 SC2  PABT. HOURS HOURS  HOURS  FACTOR

                           REPAIRS WERE  CADE ON THE TURNING VANES TO THE SCRUBBER MIST ELIMINATOR.
              AFFECTtD  MODULES: SYSTEM

       **  PROBLEMS/SOLUTION S/CCI"*ENTS
              START  DATE    g/76     £GUir«ENT: EXPANSION JOINT
              END PATE      fc/76     COMMENTr PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                           REPAIR WORK W'S NECESSARY ON THE EXPANSION JOINT SEAL WHERE THE  DUCTWORK
                           TIES INTO THE ?AIN STACK.
              AFFECTED  MODULES: SYSTEM

       **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    8/76     ECUItMENT: STACK
              END DATE      8/76     CCfiM'NT: PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                           THE STEEL PANCS AROUND THE INNER STACK STRUCTURE UfRE REPAIRED.
              AFFECTED  MODULES: SYSTEM

       *»  PROBLEMS/SOLUTIONS/COKMENTS
              START  DATE    8/76     E8UIFMENTS FAN
              END DATE      8/76     CCMMfNT: PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTA6E
                           THE I.D. FANS WERE OVERHAULED.
              AFFECTED  MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    S/76     E6UIHWENT: 6AS DAMPER
              END DATE      f. lib     COMMtNT: PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                           TK P01LER EXIT DAMPERS WERE REPAIRED*
              AFFECTED  MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    8/76     tOUIFKENT: STACK
              END DATE      8/76     COMMENT: PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                           REPAIRS k/fcRE  MDE TO STOP LEADM6E OF THE ACID-BRICK LINING IN  THE MAIN
                           STACK.
              AFFECTED  MODULES: SYSTEM

  9/76  SYSTEM                                                                720

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    9/76     E6UIFMENT: FGD SYSTEM, GENE ML
              END 0«TE     10/76     COMMENTS!
                           BOILER NUMBtRt 2 THROUGH 6 WERE COUPLED INTO THE SCRUBBING SYSTEM.   BOILER
                           NO. 1  IS DOWN FOR OVERHAUL AND REPAIRS.  THE lUCS INTERIM SLUDGE  PROCESS-
                           ING PLANT  IS INDER CONSTRUCTION AND' WILL BE IN SERVICE BY DECEMBER  1976.
                           1H TEMPORARY FACILITIES WILL PROCESS THE THICKENER UNDERFLOW AND PONDED
                           SLUDGE UNTIL 1HE POND IS DEPLETED OF SLUDGE AND THE PERMANENT FACILITY HAS
                           BEEN INSTALLED.  SCRUBBING OPERATIONS ARE STILl PROCEEDING IN AN  OPEN UATE
                           LOOP MODE  vm PART OF THE THICKENER OVERFLOW BEING DIVERTED  TO THE  ASH
                           PCND.  BECAUSE BOTH THE BEAVER VALLEY AND BRUCI MANSFIELD STATIONS  ARE
                           FULLY  OPEfiATICNALt THIS STATION HAS BEEN RELEGATED TO PEAK LOAD OPERATIONS
                           6CNE*H LOAD CPEffAjIONS ARE  FULL LOAD CAPACITY IN THE DAYTIME AND SO TO  67
                           PERCENT LOAD "EDUCTION AT NIGHT.
                            TOTAL SCRUBBtP HOURS: 23,27*       THE FIGURES AT THE LEFT WcftE  COMPILED
                              TOTAL BOILE* HOURS: 83,6*2         BY THE UTILITY FOR SYSTEM  OPERATIONS
                              TOTAL SCRUEUFR OUTAGE TIME: 5,HO  FOR THE PERIOD FOLLOWING START-UP IN
                              TOTAL SCRUPtCR AVAILABLE           JULY 1973 INCLUSIVE  TO  OCTOBER  1976.
                                  HOURS: 33,274                 THE T0TAL SCRUBBER HOURS VALLI  INCLUD
                              AVERAGE  Pk LOAD/SCRUBBER OPERATION OPERATION TIME WHIN  ONE  OR "ORE OF
                                  HOUR: <*J                     THE MODULES WERE IN  SERVICE.   TOTAL
                              TOTAL OPEfiAtlLITV INDEX: 2*X       BOILER AND UNAVAILABILITY  VALUES APPL
                              TOTAL RHIAIUITY INDEX: an       FOR ALL THE CORRESPONDING  UNITS.  THE
                                                                TOTAL SCRUBBER AVAILABILITY INDEX IN-
                                                                CLIDBS THE TIMI WHEN ONE OR MORE
                                                                MODULES WfRE AVAILABLE  POR SERVICE.
              AFFECTED  MODULES,) 8VSTEP

        **  PRObLEMS/SOLUTIONS/CCMMiNTS
              START DATE    9/76     l«UIf«ENTl SLUD6I DISPOSAL
              tND DATE     10/76     COMPtNTSl



                                                 86

-------
                                               EPA  UTILITY FGD SURVEY! DECEMBER 1978 - JANUARY  1979
                                             SECTION  3
                     DESIGN AND PERFORMAKCE  DATA  FOR OPERATIONAL FGD SYSTEMS
	PERFORMANCE  DATA	
PERIOD MODULE  AVAILABILITY CPERA&IL11Y  PLIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  F6D   CAP.
	                                                            S02  PART. HOURS HOURS  HOURS  FACTOR

                           UKTIL THE  IUCS  INTERIM  SLUD6E PROCESSING PLANT IS COMPLETE THE TEMPORARY
                           FACILITIES  WILL PROCESS THE  THICKENER UNDERFLOW AND PONDED SLUDGE UNTIL TH
                           POND  IS DEPLE1EO  OF  SLUDGE.
              AFFECTED MODULES:  SYSTEM

10/76   SYSTEM                                                                  744

11/76   SYSTEM                                                                  7?o

        **  PROBLEMS/SOLiniONS/COMKENlS
              START DATE   11/76      ESCULENT:  RECYCLE  PUMP
              END DATE     12/76      COMMINTSl RESEARCH  AND DEVELOPMENT
                           ThE  RECYCLE PIMP  EVALUATION  IS CONTINUING.
              AFFECTED MODULES:  SYSTtK

        **  PROBLEMS/SOLUTIONS/CCMMENTS
              START DATE   11/76      tBUIfENT:  F6D SYSTEM, GENERAL
              END DATE     17/76      COMMfNTSt
                           ThE  UTILITY REPORTED THAT BOILERS TWO THROUGH SIX REMAINED COUPLED INTO TH
                           SCRUBBING SYS IfM  DURING THE  REPORT PERIOD.  THF INTERIM IUCS FIXATION
                           FACILITY  WAS INSTALLED  AND COMMENCED OPERATIONS IN DECEMBER.  THE UTILITY
                           REPORTED  THAT THE VENTURI SCRUBBERS ARE STILL DEVELOPING LARGE AMOUNTS OF
                           SCALE ON  THE INTERNALS, RESULTING IN TWICE NORMAL PRESSURE DROPS.  THE RE-
                           CYCLE PUMP EVALUATION HAS BEEN IN PROGRESS.  APPROXIMATELY 2500 TO 2POO
                           HOURS OF  OPERATION TIME HAVE BEEN ACCUMULATED ON THE VARIOUS UNITS WITH NO
                           FAILURES  OR APPRECIABLE WEAR OBSEfiVED.  THE ADDITIONAL DEHATERIN6 AND RE-
                           AGENT PREPARA1ION EQUIPMENT  IS NOU BEING INSTALLED.  THE CONTRACT HAS BEEN
                           AkARDED  TO DR'VO  TO  PROVIDE  THIOSOR6IC LIME FOR THIS SCRUBS ING SYSTEM.  AL
                           BOILERS  HAVE kFEN HEADEREO INTO THE SCRUBBER PLANT., A NUMBER OF THE UNITS
                           WIRE  DOWN FOR OVERHAUL  AND REPAIR.  THE INTERIM IUCS AOZ-0-TEC UNIT  REMAIN
                           EC IN SERVICE, FILTERING OUT WATER ONLY.  THE RECYCLE PUMP EVALUATION IS
                           CONTINUING.  'FTER 4000 HOURS OF  OPERATION THE CARBORUNDUM IMPELLERS AND
                           WEAR  RINGS STILL  LOOK GOOD.   S02  AND PARTICULATE REMOVAL EFFICIENCIES ARE
                           SC AND 99 + 5! RiSPECT JVEIY.  INSTALLATION OF THE ADDITIONAL SILOS, THICKENER
                           AhD  LIME  frfO-.US  IS  STILL IN PROGRESS.  FULL COMPLIANCE PLANT OPERATIONS
                           AfcE  SCHEDULED FOR DECEMBER.
               AFFECTED MODULES:  SY$TtM

        ** PROBLEMS/SOLUTIONS/COMMEN1S
               START  DATE   11/76     E6UIFfENT:  SCRUBBER
               END  DATf,     12/76     PKOfiiEM: CHEMICAL-RELATED  SCALING
                           TKE  VENTURI SCRUBBERS ARE STILL DEVELOPING LARGE AMOUNTS OF SCALE ON THE
                           INTERNIALS.  TI ti PRESSURE DROPS HAVE  DOUBLED AS A RESULT,
               AFFECTED MODULES: SYSTEM

 12/7*  SYSTEM                                                  ;  50.00 99.00    7*4

  1/77  301
        401
        101
        2C1
        SYSTEM                                                                  7**

        ** PROBLEMS/SOLUTIONS/COMMENTS
               START  DATE    1/77     EfiUIfMENT: FGD  SYSTEM, GENERAL
               END  DATE      3/77     CCMMfNTS:
                            1S77 FULL  COMFLlANCE OPERATIONS WILL  INCLUDE  83X  S02  REMOVAL  FOR  2?  SULFUR
                            CCAL UTILIZING THIOSORBIC LIME  C6-12X  M6)  AND  FI*ATIN6  THE  SCRUBBER  WASTES
                            WITH THE IUCS P02-0-TEC  METHOD.   THE  FIXATED  MATTER  WHL  BE  HAULED A«A» TO
                            AN OFF-SITE DISPOSAL AND LANDFILL.   IUCS  HAS  BEEN  AWARDED  A  TEN  YEAR CON-
                            TRACT FOR  THE USE OF THIS METHOD.  THE CARBORUNDUM IMPELLORS  AND  WEAR  RING
                            CONTINUE TC LCOK GOOD  AFTER  MORE  THAN  5000 HOURS  OF  OPERATION.
               AFFECTED MODULES: SYSTEM

  2/77  SYSTEM                                                                 672

  3/77  SYSTEM                                                                 7**
                                                   87

-------
EPA UTILITY FbD SUPVFY:  DECEMBER 197t  -  JANUARY
                                              SECTION 3
                      DESIGN AND PERFGR0AKCE  DATA FOR OPERATIONAL F€D SYSTFHS
--------------------------- ..... ---------- PERFORMANCE  DATA ---------------------------------
PERIOD  MODULE AVAILABILITY CPERABIL1TY  PLIABILITY UTILIZATION  X REMOVAL    PER  BOILER   FGD   CAP-
                                                                    SO?   PART. HOURS HOURS   HOURS  FACTOR


  4/77   SYSTEM                                                                    720

        ** PR08LEMS/SOLUTIONS/COMMENTS
              START  DATE   4/77      E6UIFKENT: F6D SYSTfHt  GENERAL
              END  DATE      5/77      COMMiNTS:
                            DAMPER AND CIST ELIMINATOR  REPAIRS WILL BE  CORRECTED DURING A  SCHEDULED
                            OITAGE.   OVERALL SCRUBBER AVAILABILITY IS ABOUT  75X.  THE  INTER1I" SLUD6E
                            DJSPCSAL  SYSTb* Is STILL OPERATIONAL.  THE  PERMANENT SLUDGE DISPOSAL FACIL
                            I1Y IS OH  SCHEDULE FOR THE  DECEMBER 1977 COMPLETION DATE.
              AFFECTED  MODULES:  SYSTEM

        ** P ROBL EM S /SOLUTI ON S/C CMPSENTS
              START  OAjE   4/77      EOUIFfENT: F6D SYSTEM,  GENERAL
              END  DATE      5/77      COMMENTS: RESEARCH  AND  DEVELOPMENT
                            TKICSORBIC Lift TESTS BEGAM  IN LATE NAY BUT  LASTED ONLY ABOUT  ONE WEFK.
              AFFECTED  MODULES:  SYSTEM

        ** PROeLEMS/SOLUTIONS/CCMMENTS
              START  DATE   4/77      EGUIrfENT: DUCTWORK
              END  DATE      5/77
                            TfcE SCRUBBER  SYSTEM WAS SHUT DOWN FOR THREE  TO  FOUR DAYS  IN MAY DUE  TO
                            LEAKING  IN THf WET DUCT HEADER THAT LEADS TO THE STACK.   WHEN  TMf LEAK WAS
                            REPAIRED  FLUE GAS FROM FOUR  BOILERS BEGAN TO BE  SCRUBBED.
              AFFECTED  MODULES:  SYSTEM

        ** PR06LEMS/SOLUTIONS/COMMENTS
              START  DATE   4/77      ESUItWENT: GAS DAMPER
              END  DATE      5/77      PPOBtF.M: CHEMICAL-RELATED EROSION
                            WHILE  F1X1*<6  f DUCT LEAK INSPECTION OF OTHER COMPONENTS REVEALED THAT THE
                            BOILER EXIT  DAMPERS WERE ERODING.
                        MODULES:  SYSTEM
        «» PROBLEMS/SOLUTIONS/COMMENTS
               START DATE   4/77      EQUIPMENT: MIST  ELIMINATOR
               END  DATE     5/77      PfcOeLF-N: CHEMICAL-RELATED PLUGGING
                            ONE 201  EXTERML MIST ELIMINATOR WAS SEVERLY ERODED AND  PLUGGED.
               AFFECTED MODULES:  Z01

  5/77  SYSTEM       75^6                                                         741

  6/77  SYSTEM                                                                    7?0

        ** PROBLEMS/SOLUTIONS/CCMMENTS
               START DATE   4/77      ESUIfMENT: FGD  SYSTEM, GENERAL
               END  DATE     7/77      COMMtNTS:
                            ALL SIX  BOILEfcS ARE COUPLED INTO THE SCRUBBER PLANT.  FLUE GAS FROM  FIVE  0
                            T*ESE UNITS IJ BEING TREATED BY THE  SCRUBBERS.  ONLY  FOUR  OF THE  SIX  BOIL-
                            ERS ARE  ACTUALLY OPERATING  BECAUSE OF  THE  CURRENT TURBINE  REPAIR  OUTAGE.
                            OPERATIONS AR£ PROCEEDING WITH ONE SCRUBBING TRAIN BEING SPARED AT ALL
                            TIMES (MA1NTEKANCE AND  CLEANOUT).  S02 REMOVAL EFFICIENCY  IS APPROXIMATELY
                            5CX.
               AFFECTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
               START DATE   6/77      E6UITMENT: BOILER-RELATED
               END  DATE     7/77      COMMENTS:
                            BOILER NO. 6 MS BEEK DOWN  FOR ftN EXTENDED TURBINE REPAIR  OUTAGE*
               AFFECTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
               START DATE   6/77      E6Uir«ENT: RECYCLE PUMP
               END  DATE     7/77      COMWfNTS: RESEARCH AND DEVELOPMENT
                            THE RECYCLE PIMP EVALUATION STUDY CONTINUED DURING THE  PERIOD.  COMPONENTS
                            BEING EVALUATED INCLUDE: C A RP OR UN CUM  IMPELLERS, CARBORUNDUM WEAR  RINGS, TI
                            TANIUM IMPELLERS, 317SS  WEAR RINGS (STELLITE TIPPED).
               AFFECTED MODULES:  SYSTEM
                                                    88

-------
                                              EPA  UTILITY FGB SURVEY:  DECEMBER  1978 - JANUARY 1979
                                            SECTION  3
                     DESIGN  AND  PERFORMAKE  DATA FOR OPERATIONAL F60 SYSTEMS
	PERFORMANCE DATA		
PERIOD MODULE AVAILABILITY  OPERABILITY SRLlABIlITY UTILIZATION  X REMOVAL   PER  BOILER  FGO   CAP.
	 _                                                         S02  PART. HOURS HOURS  HOURS FACTOR
                         " ™  ••'""••••^••"^ »MWW«W«H«« • <**«•««•>•«.•• VB « •»•» KND REPAIRS WILL BE CARRIED OUT.  CURRENT S02 REMOVAL EFF-
                           ICIENCY IS  503.  BY EARLY  APRIL THE SYSTEM IS FXPECTEO TO REACH COMPLIANCE
                           WITH AN SC2 REMOVAL EFFICIENCY  OF 83X.
              AFFECTED MODULES! SYSTEM

  9/77  SYSTEM                                                  50.00         720

 10/77  101
        301
        *01
        SYSTEM                                                                7*4

        ** PR03LIMS/SOLUTIONS/COMMENTS
              S-TftR-T-DATf  10^77     ffitirfMINTt FGp SYSTfR,  BKNtMl                   	
              fND DAT!    10/77     PRQBUM:  NOT  DEFINED/SPECIFIED
                           MODULI  161  WAS  DOWN A  TOTAL  OF  113  HOURS  IN OCTOBER.
              AFWCTiD MODULES:  101

        ** PROBLEMS/SOLimONS/CnMMiNTS
              START DATI  10/77     teUIFHENTj SCRUBSfft
              1N» 6ATI    10/77     COHMlNTf  PRfViNTIVI MAINTfNANCI  SCHISULtD UNIT OUTA6I
                           MCPUtl  201  WAS  PUT IN  S6RVUI  ON  flCTOSSR  |6 AFTIR  IXTiNSIVi  ttlAH UP AND
                            REPAIRS TO  HU'Blft  LINING  AND  l.D,  FAN.
              AFFECTED MODULESt  201

        •* PROBLEMS/SOLUTIONS/COMMENTS
              START DATI  10/77     teUIffENT:  F6D  SYSTEM, 6INSRAL
              ENB DATE    10/77     COMMFNTSS
                          MODULI  501  WAS  DOWN A  TOTAL OF  57  HOURS  jN OCTOBER.
              AFFECTED MODULES:  ?01

        ** PftOBlEMS/SOLUTIQNS/COMMEim
              START DATS  10/77     IBUH'MENTs  FAN
              END DATI    10/77     PROBLrHs  MlCHANICAL-RIUATED  MATERIALS  FAILURE
                            MCOULE  *01  WAT DOWN  A TOTAL OF 3«  HOURS  IN OCTOilR FOR REPAIR  OF  HOLFS IN
                            FAN LINJN6  ANB TYJN6  IN  THICKENER  BLEED  LINE.
              AFFECTED MODULES:  401
 11/77   SYSTEM
                                                                               720
         **  PROBLEMS/SOLUTIONS/COMMENTS
               START  DATE   11/77      ESUIFPIENT: DUCTWORK
               END DATE     11/77
                                                  89

-------
EPA UTILITY  F(,D  SURVEY:  DECEMBER 1«7F - JANUARY 1979
                                            SECTION  3
                     DESIGN AND PERFOFKAKCE DATA FOR OPERATIONAL F«D SYSTEMS
		PERFORMANCE  DATA	'"   '
PERIOD  MODULE  AVAILABILITY OPERAEUITY  IT LI Ad I LIT V UTILIZATION   *  REMOVAL   PER  BOILER  FGD   CAP.
                                                                  SOZ  PART. HOURS HOURS   HOURS  FAtTOR

                           DURIf'f, THE SHUDOUN  OUTLET  DUCT  LEAKS  WERE REPAIRED.
              AFFECTED MOPULES: SYSTEM

        ••  PROBLEMS/SOLUTIONS/COMMEN1S
              START DATE  11/77      EGUIffENT:  DUCTWORK
              END DATS    11/77
                           POILfR EXIT DAMPERS  WERE REPLACED  DUE  TO EROSION BY FLYASH.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMEN15
              START DATE  11/77      EBUHfiENT:  STACK
              END DATE    11/77
                           COHROSION OF  STEEL  BANDS IN  STACK  WAS  DISCOVERED DURING THE PERIOD.
              AFFECTED MODULES; SYSTEM

        • *  PROISLEWS/SOLUTIONS/CfiMMENTS
              START DATE  11/77      tBUJl'ENT:  SLUD6E  DISPOSAL
              END DATE    11/77      FROBtFM: NOT  DEFINED/SPECIFIED
                           DEHATERIN6 OPiPATIONS  ARE  NOT  WORKING  PROPERLY* CAUSING PROBLEMS  IN  SLUDGE
                           HANDLING.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMINTS
              START DATE  11/77      IOU1FMENT:  FGD  SYSTEM,  GENERAL
              fcND DATE    11/77      COMMENTS:
                           THt RESULTS FfiOM THIOSORI1C  LIME LSt  CAN NOT TIT fiF QUANTIFIED DUE TC LIKE
                           FEED SYSTfeM PfOBLIMS.
              AFFECTED MODULES: SYSTSK

        *•  PROILEMS/SOLUTIONS/CCMMINTS
              START DATE  11/77      EQUIPMENT:  REAGENT  NANDLINS
              END DATE    11/77      PHCPfMt NOT  DE F] NED/SPFCIF I ID
                           LIME FEED 5YSIPW PROBLEMS  OCCURRF-D OVER  THE PERIOD.
              AFFf.CTEf) MODULES: SYSTEM

 12/77  SYSTEM                                                                  744

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  1Z/77      fcOUIF»»ENTs FGD  SYSTEM,  SENERAt
              tND DA-TE     1/78"     COWMtNTS:
                           CLHULAT1VE HOIRS  FOR JANUARY 1977 THROU6H 1-?-76 MERE  22391  FOR  MODULE 101
                           ,2099* FOR MOtULE  201* 22229 FOR MODULE  301 AND 22259  F OR  MODULE  4jj1.
              AFFECTED MODULES; SYSTEM

        **  PROBLEMS/SOLUTIONS/COHMENTS
              START OAjE  12>77      EOUIFKENT: SCRURBFR
              END DATE     1/78      CCMttfNT:  PREVENTIVE MAINTENANCE  SCHEDULED  UNIT  OUTA6E
                           SCRUBBER  TRAIh 301  WAS DOWN FOR  AN OVERHAUL FROM NOVEMBER  17  TO  MONDAY FE-
                           BRUARY 6, 197? WHEN IT MAS RETURNED TO  SERVICE.
              AFFECTED MODULES: 301

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  12/77      EfiUIFMENT: F6D  SYSTEM,  GENERAL
              END DATE     1/78      COMMENTS:
                           SCRUBBER  TRAIH 401  WAS REMOVED FROM SERVICE ON THE  6TH OF  FEBRUARY.
              AFFECTED MODULES: 401

        **  PR06LEMS/SOLUT10NS/COI»MENT$
              START DATE  12/77      EQUIPMENT: SLUDGE DISPOSAL
              END DATE     1/76      PROBUM:  NOT DEFINED/SPECIFIED
                           THE  IUCS  INTEMM  SLUDGE  TREATMENT SYSTEM  HAS  SOME  DEWATER1NS  PROBLEMS
                           DURING DECEMBER PHILLIPS EXPERIENCED  POOR SLUDGE  REMOVAL.  THE IUCS  PLANT
                            IS WORKING ON A PART TIME  BASIS.  FULL OPERATIONS  ARE  EXPECTED LATE  THIS
                           SFRIN6.   THE  tOOR  QUALITY SLUDGE  IS SENT  TO AN EMERGENCY POND AND THEN  HE-
                           CIRCUIATFD 6ACK TO THE THICKENER
              AFFECTED MODULES: SYSTEM
                                                  90

-------
                                              EPA UTILITY  FGD  SURVEY:  DECEMBER  1978  - JANUARY 1979
                                            SECTION 3
                     DESIGN »ND PERFOfKAriCE DATA FOR OPERATIONAL  FGD  SYSTEMS
                                           PERFORMANCE  DATA -------------------- - ---------------------
PERIOD MODULE  AVAILABILITY DURABILITY  (PLIABILITY UTILIZATION   Z  REMOVAL    PER  BOILER  F6D   CAP.
                                                                  S02   PART.  HOURS HOURS  HOURS FACTOR
~ ™~ "*"" ™ """"*"••  »™»— »~«fc»— _ M. "•^•••.•.••^••.•^•.^  — «.•.«.•»««,_«_ AKK«.»M*» — 9BM»  W V A_  A K«« «  • «•__•• •• w V            .•• IB •

       **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  12/77     EQUIfNENT:  REAGENT  HANDLING
              END DATE     1/78     COKKfNTS:  RESEARCH  AND  DEVELOPMENT
                           TESTING WITH  IHJOSORBIC LIWE  AT  5X M60 HAS  SHOWN  THAT THE W60 CONCENTRATI-
                           ON IS NOT GREfT ENOUGH TO  EFFECT  ADI8UATE SQ2 REMOVAL ON A SINGLE STA6E
                           SCRUPBER.  THtY ARE  60IN6  TO  TEST  AT  A GREATER M60 CONCENTRATION BY START-
                           ING *T 101 ANP  THEN  DROPPING  BACK  UNTIL  THE  CONCENTRATION IS SATISFACTORY.
                           THJS TESTING, AS  WEIL AS SCRUBBER  OPERATIONS, HAVE, HOWEVER, BEEN HAMPER-
                           ED BY LOW LfAtS AS  A RESULT  Of  THE COAL  STRIKE.
              AFFECTED MODULES: SYSTEM

       **  PROEJLEMS/SOLUTIONS/COWMENTS
              START DATE  12/77     EOUIfMENT:  STACK
              END DATE     1/78
                           THERE WILL BE AN  BUTA6E AT PHILLIPS HO REPLACE THE CARBON STEEL BANDS  IN
                           THE STACK U T ti  STAINLESS STEEL  BANDS,
              AFFECTED MODULES: SYSTEM

  1/78   301
        401
        101
        201
        SYSTtH                                                                 7*4          *?1

  2/78   101
        Z01
        301
        401
        SYSTEM                                                                 672          167

        ** PROBLEMS/SOLUTIONS/COMWENTS
              START DATE   2/78     EQUIPMENT:  STACK
              fcND  DATE     5/78
                           AK  OUTAGE  OCCURRED  BETW5EN JANUARY 6 AND JANUARY  8 WHEN THE STACK ORAIN
                           LEAKS WERE  REPAIRED  PT  SANDBLASTING THE  OUTER WALL AND REPLACING THE CAR-
                           PON STEEL  BAN!S WITH STAINLESS  STEEL BANDS.
              AFFECTED  MODULES;  SYSTEI*
              START  DATE    2/78      EGUIPMENT:  F6D SYSTEM, GENERAL
              END DATE      3/78      COPIMtNTS:
                            THE  SYSTEM WAS SHUTDOWN ON FEBRUARY 11 DUE TO THE COAL SHORTAGE.  THE OUT-
                            ACE  CONTINUED THROUGH MARCH AND THE SYSTER IS SCHEDULED TO BE ON LINE BY
                            APRIL 15.  DUMNG THE OUTAGE A NDMPER OF REPAIRS AND MODIFICATIONS WERE
                            MADE.
              AfFECTED  WODULES:  SYSTEM

        ** PfiO&LEMS/StnUTIONS/CCMMENTS
              START  DATE    2/78      t«UI FWENTs  GAS DAMPER
              tND DATE      3/78      COMPtNT: PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                            THE  BOILEfl EXIT DAMPERS WERE LINED WITH 316SS ON AREAS Of HIGH EftOSION
                            CAUSED BY HY«*H INPINGEHENT.
              AFFECTED  MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/CCMMENTS
              START  DATE    2/78      ECUK'MENT:  EXPANSION JOINT
              END DATE      3/78      COKMfNTi PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                            EXPANSION 40IMTS ON  THE INLET DUCTWORK WERE SHIELED BY METAL PtATES  WHICH
                            WERE  WELDtD A 1 ONE END.
              AFFECTED  HODULESi  SYSTEM

        ** PROBLEHS/SOLUTIONS/COftMENTS
              START  BATE    2/78      E«UIFHENTS  DUCTWORK
              END DATE      3/78      COMPHNT: PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                            NUMEROUS HOLES IN IKE WET GAS ftUcT WORK WERE  REPAIRED  AND  THE DUCTS  WERE
                            RELINED WITH CEILCOTE.
                                                  91

-------
F.PA UTILITY  F6D  SURVEY:  DECEMBER 197fc - JANUARY 1979
                                            SECTION  3
                     DESIGN AND PERFORMA^E DATA FOB OPERATIONAL  FCO SYSTEMS
--------------------------- ...... --------- PERFORMANCE  DATA ------- - ----------------------------------
PERIOD  MODULF  AVAILABILITY OPERAEILITY  FELIABILITY  UTILISATION   * REMOVAL   PER  BOILER   FGD    CAP.
                                                                  S02  PART. HOURS HOURS   HOURS  FACTOR

              AFFtCTED MODULES: SYSTEK

        *•  PROBLEMS/SOLUTION S/CO!»MEN1S
              START DATE   2/78     Etllil f*ENTi  GAS  DAMPER
              END BATE     3/78     CCMMfNT: PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                           THE THROAT CAPPERS WERE  CLEANED  ON ALL THE SCRUBBERS.
              AFFECTED MODULES: SYSTEK

        **  PRObLEMS/SOLUTIONS/COMENTS
              STA«T OAjE   2/78     teUIIMENT:  MIST  ELIMINATOR
              END DATE     3/78     CDM-UKT: PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTA6E
                           INTERNAL MIST  ELIMINATORS WERE  CLEANED'  THE EXTERNAL MIST ELIMINATORS,
                           WHICH ARE ADIY DETERIORATE D t MAY RE.  REPLACED.
              AFFECTED MODULES- SYSTEM

        *«  PROElLEMS/SOLUTIONS/COMMENTS
              START DATE   2/76     ffiUI('-£NT:  STACK
              END D*Tf     3/78     COMMiNT: PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                           THE STACK BB J CKLINI N6  WAS INSPECTED AND SO»E BRICKS WERE  REPLACED AT  THE
                           TOP OF THE STi>CK.
              AFFECTED MODULES: SYSTEM

        ••  PR06LEWS/SOLUTIONS/COWMENTS
              START DATE   2/78     EBUIf'»ENTs  FGD  SYSTEM,  GENERAL
              EK'D DATE     7/76     CGPMtNTS:
                           CONSTRUCTION  kORK ON ADDITIONAL  P6UIPMENT SUCH AS THE THICKENED  AND  SILOS
                           IS ALMOST COMPETE.  IT  WAS  NOTED THAT THE CEHCOTE LINER COROLJNE  505AR
                           HAS HELD UP  WILL OVER  THREF  YEARS ON  THE CONICAL APEX OF  MODULE  *01.
              AFFECTED MODULES: 5YSTEK  4C1
  3/78   SYSTEM

  4/7?   SYSTEM
                                                                 744

                                                                 720
                                                                                     402
        ** PROBLEMS/SOLUTIONS/COMMENTS
START DATE
END DATE
4/78     tOUIFfENT:
5/73     COMMENTS:
THE F6D SYSTEM CAME
IS NOT OPERATIN6 AT
                                                FGD  SYSTEM,  GENERAL
                                              BACK
                                              FULL
                                                     ON LINE AFTER THE COAL
                                                     LOAD BECAUSE THE NO. *
                                                              STRIKE IN LATE MARCH.   IT
                                                              ROjLER IS STILL OUT  AND
                                                   COMPLIANCE TESTS WILL TAKE PLACE1K
                                              LINE* TO SFE IF THE SYSTEM IS MEETING  THE
                                              ?J SULFUR COAL.  THERE WFRF NO HOURS RE
                           SHOUIK  BE  PACK  ON L I NE  IN M I D-J UL Yi
                           JULY, AFTER  BCILER  6  IS  BACK  ON
                           831  502  REMOVAL  REQUIREMENT FOR
                           PORTED  FOR THIS  PERIOD  BECAUSE OF PRELIMINARY TESTING BETMG  CONDUCTIK'G IN
                           PREPARATION  FIR  THE  COMPLIANCE TESTS.  SO FAR, TESTS  INDICATE  THAI  THE SYS
                           TEM  WILL COMPLY  WITH  THE REQUIRED STANDARDS.  THE AVAILABILITY FOR  ALL
                           FOUR  TRAINS  WIS  BETWEEN  65 AND 75 PERCENT.
              AFFECTED MODULES:  SYSTEM
5/78  SYSTEM       70,0

6/78  SYSTEM
                                                                 744

                                                                 720
                                                                                      619

                                                                                      597
        «* PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/76      EQUIt'PENT:  MIST ELIMINATOR
              tND DATE     7/78      CCMMCNT: PREVENTIVE MAINTENANCE SCHEDULED UNIT  OUTAGE
                           THE  INTERNAL  TST ELIMINATOR ON MODULE 2Ql WAS REMOVED  AM) CLEANED OVER
                           THE  PERIOD.
              AFFECTED MODULES:  201

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/76      ICUII-PENT:  F6D SYSTEM, GENERAL
              END DATE     7/78      COMMENTS:
                           THE  FGD  SYSTEf HAS ACCUMULATED APPROXIMATELY 24000 HOURS OF OPERATION ON
                           ALL  FOUR  MODULES SINCE START-UP.
              AFFECTED MODULES:  SYSTEM

        «* PROSLEMS/SOLUTIONS/COMMENTS
              START DATE   6/78      EfiUIfMENT:  PROCESS CONTROL
              END DATE     7/78      PROBlFn: NOT DEFINED/SPECIFIED
                                                  92

-------
                                              FPA  UTILITY  FED  SURVEY:  DECEMBER  1978  -  JANUARY  1°79
                                            SECTION  3
                    DESIGN  AND  PERFORMAKE  DATA  FOR OPERATIONAL  F6D  SYSTEMS
   .....	..	_—„	PERFORMANCE  DATA	--
PERIOD MODULE AVAILABILITY  CPERAB1LITY  RELIABILITY  UTILIZATION   X  REMOVAL    PER   BOILER   F6D    CAP.
                                                                 S02   PART.  HOURS  HOURS   HOURS  FACTOR

                          WATER  BALANCE  PROBLiHS  HAVK  CONTRIBUTED  TO  THE OCCURRANJE  OF~LOW  PH,  RE-
                          SULTING  IN HlfT  ELIMINATOR  PLUGGING.
             AFFECTED BODULES:  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE   6/76      EQUIPMENT:  REAGENT  HANDLING
             END  DATE     7/78      PROBiEM! NOT DEFINEO/SPECIFIED
                          THE  WIST ELIMINATOR  PLUGGING IS  ALSO  RELATED  TO  LOW  PH  RESULTING  FROM LIME
                          HANDLING AND  SLURRY  PREPARATION  SYSTEM FAILURE.
             AFFECTED MODULES;  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE   6/78      EQUIPMENT:  F6D SYSTEM,  GENERAL
             END  DATE     7/78      COMWtNTSS
                          T«  UTILITY It CURRENTLY  STUDYING WAYS TO TIGHTEN THE WATER BALANCE  BY
                          US IMP THICKENER  SUPERNATANT  INTERMITTENTLY  WITH  CLEAR SERVICE  WATER  FOR  TH
                           MIST  ELIMINATORS.  THE COMPLIANCE TEST SHOULD TAKE PLACE  DURING  THE  NEXT
                           REPORT PERIOD .
             AFFECTED MODULES:  SYSTEM

  7/7S   SYSTEM                                                                 74*    506

  8/78   SYSTEM                                                                 744    708

        ** PROBLEHS/SOLUTIONS/CCMMENTS
              START  DATE    8/78      EQUIPMENTS  MIST  ELIMINATOR
              END  DATE      9/78      COMMENT: PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                           DURING TH| AUGUST-SEPTEMBER  PERIOD MIST  ELIMINATOR CLEANING TOOK  PLACE IN
                           ORDER TO CORRFCT THfc PLUGGING PROBLEM.
              AFFECTED  MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COPI«ENTS
              START  DATE    8/78     EGUIFMENT:  MIST  ELIMINATOR
              END  DATE      9/78     PROBLEM: NOT DEFINED/SPECIFIED
                           Ih AUGUST THE INTERNAL MIST ELIMINATOR ON MODULE 201 WAS REPLACED.
              AFFECTED  MODULES;  201

        •*  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    8/78      EQUIPMENT:  REAGENT HANDLING
              END BATE      9/76     COMMENTS PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                           THE LIME HIXIC& BASIN HAD TO BE  SHUT  DOwN OVER A WEEKEND SO  THAT EXCESSIVE
                           GRIT AND SOLID PARTICLES THAT HAD BUILT UP  COULD BE CLEANED  OUT.
              AFFECTED  MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    8/78     EQUIPMENT: ABSORBER
              END  DATE      9/78     CCMMlNTt PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                           HIGH PRESSURE WATER CLEANING WAS PERFORMED  ON MODULES 101 AND 4()1 •
              AFFECTED  MODULES: 101    4f1

        **  PROBLEMS/SOLUTIONS/CCMMENTS
              START  DATE    E/78      EQUIPMENT: ABSORBER
              END DATE      9/78
                           THE RUBBER LIMNG IN MODULE  101 WAS REPAIRED.
              AFFECTED  MODULES: 101

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    8/78     EQUIPMENT: SLUDGE  DISPOSAL
              END DATE      9/78     PROBLEM: NOT  DEFINED/SPECIFIED
                           A MAJOR PftOBLIM AREA DURING  THE PERIOD  WAS CAUSED BY INSUFFICIENT SUPPLIES
                           OF DRY  FLYASH TO MIX WITH THE SLUDGE.  AS A  RESULT  THE SLUDGE HAS BEEN
                           LEAKING OUT OF THE  TRANSPORT TRUCKS WHILE IN TRANSIT TO THE FINAL DISPOSAL
                           SITE.   APPARENTLY NOT  ENOUGH FLYASH IS  BEING COLLECTED WITH THE  PRESENT
                           SYSTEM.
              AFFECTED  MODULES: SYSTEM
  9/78  STSTEM
                                                                               7JO    572
                                                 93

-------
F.PA UTILITY  F6D SURVEY: DECtneFR 1978 - JANUARY  1979
                                              SECTION  3
                     DESIGN  AND  PERFORMANCE  DATA  FOR OPERATIONAL  FED  SVSTF.BS
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERAEILITY  PLIABILITY UTILIZATION  X  REMOVAL    PER  BOILER   FGD   "P.
                                                                   SO?   PART. HOURS HOURS   HOURS MCTOR
10/78   SYSTEM

11/7?   SYSTEM
 12/75
        101
        201
        301
        401
        SYSTEM
91.9
88.0
27.?
87.5
                       744

                       720
                       744
                             540
        ** PROBIEMS/SOLUTJONS/COMMENTS
               START  DATE  12/78      ECUItHENT: SLUDGE DISPOSAL
               END  DATE      1/79      FOOBIEM: NOT DEFINED/SPECIFIED
                           DUR1N6 THE  PERIOD THE LACK 0' FLYAsH  FOR  MIXING WITH SLUD6E  WAS A PROBLEB
               AFFECTED  HODULES: SYSTtn
  1/79
        101
        201
        301
        401
        SYSTEM
86. 7
69.?
50.0
83.6
                       744    539

-------
                                           EPA UTILITY FGt SURVEY: DECEMBER 1978 - JANUARY 1979
                                         SECTION 3
                  OES16N AND PERFOKMAhCE DATA FOR OPERATIONAL F6D SYSTEMS
COMPANY MAKE
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICIPATE EMISSION LIMITATION - KG/J
S02 EMISSION LIMITATION -  H6/J
NCI PLANT GENERATING CAPACITY  - MU
GROSS UNIT GENERATING  CAPACITY - «k
NET UNIT GENERATING CAPACITY  H/FGD - Mt.
NET UNIT GENERATING CAPACITY  VO/FGC -  t>*»
EOUIVALFNT SCRUBBED CAPACITY  - NU

** BOILER  DATA
    SUPPLIER
    TYPf
    SERVICE LOAD
    COMMERCIAL  SERVICE DATE
    MAXIMUM BOILER  FLUE GAS  FLOW - CU."/S
    FLUE GAS TEMPERATURE  . C
    STACK  HE16HT  -  l"l
    STACK  TOP  DIAMETER -  H

«*  FUEL  DATA
     FUEL  TYPE
     FUEL  6RADE
    AVERAGE HEAT  CONTENT  - KJ/HO
    RANEE  HEAT  CONTENT -  BTU/IB
    AVERAGE ASH CONTENT - X
     RANtE  A&H  CONTENT  - X
     AVtRAGt MOISTURE  CONTENT
     RANGE  MOISTURE  CONTENT - X
     AVERAGE SULFUR  CONTENT - «
     RANGE  SULFUR  CONTENT  - X
     AVEKA6I  CHLORIDE,  CONTENT •
     RAN6E CHLORIDE  CONTENT - X
     FUEL  FIRING RATf,  - M  T/H
     FUEL  FlftlNg MT8  - MM

 ** SSP
                             -  X
    TYPI
    SUPPLIER
    PARTICIPATE, DESIGN REMOVAL EFFICIENCY
    FLUE  6AS  TEMPERATURE  - C

** FSC SYSTEM
    SALEABLE  PRODUCT/THROW AWAY PRODUCT
    GENERAL PROCESS TYPE
    PROCESS TYPE
    SYSTEM SUPPLIER
    A-E FIRM
    DEVELOPMENT LEVEL
    NEW/RETROFIT
    PARTICULATE DESIGN REMOVAL EFFICIENT
    S02 DESIGN REMOVAL EFFICIENCY - X
    INITIAL START-UP

** ABSORBER
    NUMBER
    TYPE
    INITIAL START UP
    SUPPLIER
    DIMENSIONS
    SHELL MATERIAL
    BOILER LOAD/ABSORBER - X
    GAS FLOW  - CU.M/S
    PARTICULATE INLET LOAD - G/CU>*

** MIST ELIMINATOR
    NUMBER
    TYPE
    CONFIGURATION
    NUMBER OF STAGES
    NUMBER OF PASSES
                                           • X
                                                             <****** LB/MMPTU)
                                                             (****** LP/MMBTU)
GULF POWfR
SCHOLZ
1,2
CHATTAHOOCHEE
FLORIDA
C
******
******
   80.0
   25.0
   23.0
*******
   23.0
                                              SABCOCK AND WILCOX
                                              PULVERIZED COAL, DRV BOTTOM
                                              BASE
                                               Q/53
                                              ********        (******* ACFM)
                                              *******         (**** F)
                                                 23.          (  76 FT)
                                              *******         (»**** FT)
COAL
BITUMINOUS
 29075.

   11.00
******
    5.00
******
    ?.50
2.5-5.0
********
******
   34.5
*****
 COLD  SIDE
 BUEU
    99.5
   1S1.7
                                                              (  12500 6TU/LB)
                                                              ******
                                                              (  36 TPH)
                                                               (  305  F)
                                                SALEABLE PRODUCT
                                                WET SCRUBBING
                                                LIMESTONE (CHIYODA 121)
                                                CHIYODA INTERNATIONAL
                                                CATALYTIC INC.
                                                PROTOTYPE
                                                RETROFIT
                                                   99.50
                                                   90.00
                                                 8/78
                                                JET BUBBLING REACTOR
                                                 am
                                                CHIYODA INTERNATIONAL
                                                24 FT D1A.
                                                STAINLESS STEEL
                                                   50.0
                                                   25.01       (  SjOOO ACFIO
                                                     .1        (  .010 GR/SCF)
                                                CHFVRON
                                                VERTICAL
                                                    2
                                                    2

-------
FPA UTILITY  F6D  SURVEY:  DECEMBER 19?P - JANUARY 1979
                                             SECTION  3
                     DES16N AKD PERFORMANCE  DATA  FOR OPERATIONAL  FtD SYSTEMS
           SYSTEM

 ** WATER  LOOP
      TYPE

 •* BYPRODUCTS
      BYPRODUCT NATURE
      DISPOSITION
                                          MINUTE  ..ASH OF  FIRST  STAGE EVERY TWO WEEKS
                                      CLOSED
                                      GYPSUM
                                      STACKED IN  POND
 	,	PERFORMANCE  DATA	----
 PERIOD MODULE AVAILABILITY OPERABIL1TY  PLIABILITY  UTILIZATION  X REMOVAL   PER  BOILER   FGD    CAP.
                                                                  SOZ  PART. HOURS HOURS  HOURS  FACTOR
  8/78   SYSTEM
                                                                               744
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   8/78      EQUIPMENT:  F6D  SYSTEM*  GENERAL
              END DATE     8/78      COMMENTS:
                           OPERATION  BEGAN  ON  AUGUST  3Q,197E.
              AFFECTED MODULES:  SYSTEM

        • * PROdLEMS/SOLUTIONS/COMMENTS
              START DATE   8/78      EOUIPMENT:  FGD  SYSTEM,  GENERAL
              END DATE     9/78      COMMITS:
                           NC  INITIAL OPfRATlONAL PROPLEMS  VIKt REPORTED.
              AFFECTED MODULES;  SYSTEM
  9/78  SYSTEM

 10/78  SYSTEM
                                                                    720

                                                                    720
        *« PR06LEMS/SOLUTIONS/CCMWENTS
              START  DATE   10/78      ECUlFMENTi  F6D SYSTEM* GENERAL
              6NO DATE     11/78      COMMENTS;
                            NC MAJOR  OPERATIONAL PROBLEMS WIRE REPORTED*
              AFFECTED MODULES:  SYSTlf!
PROBLEMS/SOLUTIONS/COMMENTS
   START DAjE  1(3/78      EQUIPMENTS
   END DATE    10/78      COMMkNTSS
                A  1JC HOUR SCKDULED
   AFFECTED MODULES: SYSTEM
                                                 GD SYSTEM* GENERAL

                                                 OUTAGE OCCURRED IN OCTOBER,
 t1/7«  SYSTEM

        SYSTEM
                     100.0
                                                                    720

                                                                    744
        ** PROULEMS/SOLUTIONS/CCMHENTS
               START  DATE   12/78      tOUIfENT: F60 SYSTEM. GENERAL
               6NO  DATE      1/79      COMMINTSs
                            TfcERE HAVE BEEN NO UNPLANNED SHUTDOWNS  6Ufi?N6  B$CEI"BER  AND JANUARY,
               AFFECTED  MODULES*  SYSTfM

        ** PROBUEMS/SOLUTION5/COMMENTS
               START  DATE   13/78      ECUIFKINT: f66 SYSTEM* BtNERftL
   END DATE
                            1/79     COMMENTS;
                            THE SYSTEM IS NOW BFJN6 OPERATED  IN WHAT  1$  CALLED  PHASE II OF THE
                            THE SYSTEM IS DELIBERATELY BEING.  UPSET  FROM  EflUILIERIUM (PH, OXIDIZING AIR
                            IKPUT, ETC.) TO SEE HOW THE SYSTEM RESPONDS.
                        MODULES: SYSTEM
  1/79  SYSTEM
                                100.0
                                                                     744
                                                  96

-------
                                            EPA UTILITY FGO SURVEY: DECEMBER 1978 - JANUARY 1979
                                          SECTION 3
                   DESIGN AND PERFORMANCE DATA FOR OPERATIONAL FGD SYSTfMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION -  f.6/J
S02 EMISSION LIMITATION  -  liG/J
NET PLANT GENERATING CAPACITY - MV
CROSS UNIT GENERATING  CAPACITY - MW
NET UNIT GENERATING CAPACITY W/FGD -  Ml*
NET UNIT GENERATING CAPACITY WO/F6B - fU
EQUIVALENT SCRUBBED CAPACITY - MW

• * BOILER  DATA
    SUPPLIER
    TYPE
    SERVICE  LOAD
    COMMERCIAL  SERVICE DATE
    MAXIMUM  BOILER  FLUE GAS FLOW - CU.K/S
    FLUE  GAS  TEMPERATURE - C
    STACK  HEIGHT  -  M
    STACK  TOP DIAMETER - M

**  FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE  HEAT  CONTENT - KJ/KG
     RANGE HEAT  CONTENT - B1U/LB
     AVERAGE  ASH CONTENT - X
     RANGE ASH CONTENT  - X
     AVERAGE  MOISTURF,  CONTEKT -  X
     RANGE MOISTURE  CONTENT - »
     AVERAGE SULFUR  CONTENT - I
     RANGE SULFUR  CONTENT - X
     AVERAGE CHLORIDE  CONTEM -  %
     RANGE CHLORIDE  CONTENT - X
     FUEL FIRINfi RATE  - M T/h
     FUEL FIRING RATE - MW

 ** ESP
     NUMBER
     T»Pf
     SUPPLIER
     PARTICULATE DESIGN  REMCVAl EFFICIENCY

 »« F66 SYSTEW
     SALEABLE PRODUCT/THROW AWAY PRODUCT
     GENERAL PROCESS TYPE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-l FIRM
     DEVftOPniNT LIVIL
     NIK/RETROFIT
     MRTJfULATI D6SI6N  RIMBVAt
     SO2 OESISN REMOVAL  EFFICIENCY -  X
     COMMERCIAL DAT!
     INITIAL  START-UP
     CONSTRUCTION COMPLETION
     CONSTRUCTION INITIATION
     CONTRACT AMARDI6

 •* ABSORBER
     NUMBER
     TYPt
     INITIAL  START UP
     SUPPLIER
     NUMBER OF  STAGES
     DIMENSIONS
     SHELL MATERIAL
     SHELL LINER MATERIAL
     BOILER LOAD/ABSORBER  - X
     6AS  FLOW - CU.M/S
     GAS TEMPERATURE - C
     L/6  RATIO  - L/CU.M
     PRESSURE DROP  - KPA
                  (****** LB/MMBTU)
                  ( 1.200 LB/MMBTU)
INDIANAPOLIS POWER
PETERSBURG
3
PETERSBURG
INDIANA
A
******
  516.
 1180.0
  532.0
  515.0
  52S.O
  532.0
  COMBUSTION  ENGINEERING
  PULVERIZED  COAL
  BASE
    o/rr
  ********        (******* ACFM)
     T37.2         t  279  F)
     188.          (  £16  FT)
  *******         (***** FT)
   COAL
   BITUMINOUS
    25Q04.

   ********
   9-10
   ********
   10. 3-16.5
       3.2S
   1.5-4.5
   ********
   ****** '
     23<«0
     515
                f 10750 BTU/LB)
                ******
                (258 TPH)
   COLD SIDE
   RESEARCH COTTRELL
X     99.3
   THROUAWAY PRODUCT
   WET SCRUBBING
   LIMESTONE
   AIR CORRECTION DIVISION*  UOP
   EIBBf. AND HILL
   FULL-SCALE
   NIW
      99. SQ
      B«.00
   12/77
   12/77
    8/77
   1Q/7S
    1/75
   TURBULENT CONTACT ABSORBER
   12/77
   AIR CORRECTION DIVISION* UOP
       3
        30 X
 30 X 30 X 1CO
 CARBON STEEL
 RUBBER
    25.0
   176.96
    47.8
     6.7
     1.7
                   ( 375000 ACFM>

                   ( 50.0 6AL/1000ACF)
                   < 7.0 JN-H20)
                                                 97

-------
fP» UTILITY  FGO  SURVFY;  DECEMBER 19?P - JANUARY 1979
                                             SECTION  3
                     DES1FN AND PERFORMANCE  DATA FOR OPERATIONAL  FCD SYSTEMS
      SUPfRFKAL GAS VELOCITY -
      PARTICULATE INLET LOAD - C/CU.K
      S02  INLET CONCENTRAT I0h - PPM
      S02  OUTLfcT CONTRATION - PFK
      S02  DESIGN REMOVAL EFFICIENCY - X

  «*  FANS
      NUMBER
      TYPE
          ELIMNATOR
      NUMBER
      CONFIGURATION

     PUMPS
      SERVICE
    RECYCLE

** TANKS
    SERVICE

    LIMESTONE SLURRY
    WASTE SLURRY
    RECYCLE
    THICKENER OVERFLOW

«* REHEATER
      TYPf
      HEATING MEDIUM
      TEMPERATURE BOOST -  C
      ENERGY MEQU1RFO

     THICKENER
      NUMBER
      CONSTRUCTION MATERIAL
      DIAMETER - "
      OUTLET SOLIDS - X

     WATER LOOP
      TYPF
      FRESH MAKEUP WATER ADDITION  -  LHfRS/S
     .1
 3400
  385
   85.0
                                                 BOOSTER
 a
HORIZONTAL


NUMBER

   8
                                                  NUMBER
               ( U.5  FT/S)
               t  .025 GR/SCF)
                                                  tttt
                                                  tttt
                                                  ***<
                                                  * ***
INDIRECT HOT AIR
STEAM
   1(^.7         (   30  F)
24« MM BTU/HR.
                                                            CARBON STEEL
                                                               (165 FT)
                                                                  88? GPM>
   SO.!
CLOSED
   55.6
     REAGENT PREPARATION EQUIPMENT
      NUMBER OF BALL MILLS
      BALL MILL CAPACITY- M  T/H

     TREATMENT
      CONTRACTOR
                                                  IUCS
                (  «Z.O  TPH)
     DISPOSAL
      NATURE
      TYPE
      LOCATION
      TRANSPORTATION
FINAL
UNLINED POND
ON-SITE
TRUCK
 	PERFORMANCE DATA	
 PERIOD MODULE AVAILABILITY  OPERABILITV  ^LIABILITY UTILIZATION  X REMOVAL   PER   BOILER   F6D   CAP.
                                                                  SOZ  PART.  HOURS  HOURS  HOURS FACTOR
 12/77  SYSTEM
                              7*4
        ** PR08LEMS/SOLUTIONS/COMMENTS
              START  DATE   12/77     ttUJf!"ENT: FGD SYSTEM,
              END DATE     12/77     COMMCNTSs
                            OPERATION Of  ALL FOUR MODULES COMMENCED  DURING  DECEMBER.
              AFFECTED MODULES: SYSTEM

        •* PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   12/77     E8UIFMENT: AGITATOR
              END DATE     12/77     PROPLTM: NOT DEFINED/SPECIFIED
                                                  98

-------
                                              EPA UTILITY FGD SURVEY: DECEMBER 1978  -  JANUARY  1979
                                            SECTION 3
                    DESIGN  AND  PERFORMAKCE DATA FOR OPERATIONAL F6D SYSTEMS
---------- - ------------------------------- PERFORMANCE- DATA -------- - ---------------------------------
PERIOD MODULE  AVAILABILITY  GPERABIL1TY RELIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD    CAP.
                                                                 S02  PART.  HOURS  HOURS   HOURS  FACTOR

                           REPAIRS TO TH£ RECYCLE TANK AGITATOR WERE REQUIRED.
              AFFECTED  MODULES: A

       SYSTEM                                                                  7*4

       ** PROBLEMS/SQLUTJONS/COMMENTS
              START  DATE   1/78     E6UIFWENT: BOILER-RELATED
              END BATE      4/78     PROBUM: NOT DEFINED/SPECIFIED
                           PROBLEMS WERE fNCOUNTERED WITH THE  FLYASH HANDLING  SYSTEM  FORCING FGt>
                           SHUTDOWN.  THfc UNIT WAS RESTATED  IN THE RIDDLE OF APRIL.
              AFFECTED  MODULES:
  2/78   SYSTEM                                                                 672

        **  PROBLEMS/SOLUTIONS/COMWENTS
              START DATE   2/7»     E^UKHENT! PIPING
              END DATE.     J/7B     PR081FMS WEATHER-RELATED COMPONENT  FAILURE
                           PIPE FREEZE~Uf DAMAGE WAS REPAIRED.
              AFFECTED MODULES: 5YST6K

  3/7P   SYSTEM                                                                 74*

        *«  PROBLIMS/SOLUTIONS/COMWENTS
              START DATE   3/78     IQUIF'MtNT: F6D SYSTEMi GENERAL
              END DATE     3/78     CONMtN'TSs
                           IMSULATION UK! INSTALLED DURING THE  SYSTEM OUTAGE.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COKMENT&
              START DATE   3/78     EQUIPMENT: THICKENER
              END DATE     2/78     PROBLEM: MECHANICAL-RELATED  COMPONENT  FAILURE
                           A PRCKEN FINICN GEAR WAS REPAIRED DURING  THE  SYSTEM  OUTAGE.
              AFFECTED MODULES: SYSTEM

        **  PROGLEMS/SOLUTIONS/COMHENTS
              START DATE   3/78     EGUIFKENT: INSTRUMENTATION
              END DATE     3/78     COKMtNT: PREVENTIVE MAINTENANCE
                           IHSTRUNENTATI (N MAINTENANCE  PERFORMED  DURIN6  THE  SYSTEM  OUTAGE.
              AFFECTED MODULES: SYSTEM

  «/78  SYSTEM                                                                 720

        •«  PROBIEKS/SOLUTIONS/COMMENTS
              START DATE   4/76     teUIfMENT: VALVES
              END DATE     5/78     PROBLEM: NOT DEFINED/SPECIFIED
                           All CONTROL  VM.VES  U£RE RETURNED  TO  THE  FACTORY FOR  MODIFICATIONS.
              AFFECTED MODULES: SYSTEM

  5/78  SWIM                                                                 7*4

        **  PROBlEMS/SOLUTIONS/COMMENTS
              START DATE   5/76     EQUIPMENT: BOILER-RELATED
              END DATE     611%     PRCtUEM: NOT DEFINED/SPECIFIED
                           THE MAIN POWER TRANSFORMER  FAULTED  CAUSING  THE  SYSTEM TO SHUTDOWN.
              AFFECTED MODULES: SYSTEM

  6/78  SYSTIM                                                                 nO

  7/7B  SYSTEM                                                                 7*4

  8/78  SYSTEM                                                                 7**

        ** PROBIEMS/SOLUTIONS/COMMENTS
              START BATE   8/78     E6UIFMENT:  PROCESS  CONTROL
              END DATE     9/76
                           PROBLEMS HAVE BEEN  EXPERIENCED WITH  CONTROLS.
              AFFECTED MODULSSs SYSTEM

-------
EPA UTILITY F6D SURVFY:  DECEI»PER I97f - JANUARY 1979
                                            SECTION 3
                     DESIGN AND PERFOR*A»CE DAT* FOR OPERATIONAL F6o SYSTEMS
	PERFORMANCE DATA	"	
PERIOD  MODULE  AVAILABILITY OPERA8ILITY ^LIABILITY UT1LI7ATIOM  *  REMOVAL    PI"   BOILER  F6D   CAP.
                                                                 SCI2   PART.  HOURS HOURS  HOURS FACTOR


        **  PROBLEMS/SOLUTIONS/COMMENTS
              ST»RT  DATE   8/7B     EOUHMENT: PIPING
              END DATE    10/7fc
                           PHOBlfMS HAVE SEEN EXPERIENCED WI]H CONTROLS.
                           CRACKING PROBLEMS HAVE BEEN EXPERIENCED  WITH  FIBERGLASS  PIpING.  THt PROB-
                           LEM WAS SOLVED BY REPLACING SECTIONS  WITH  RUBBER  LINED STEEL PIPING, NEK
                           FMP PJPINt, A I'D PROVIDING ADDITIONAL  PIPE  SUPPORTS.
              AFfECTED MODULES: SYSTEM

  9/7E   SYSTEM                                                                  720

 10/78   SYSTEM                                                                  744

        **  PR06LEMS/SOLUTIONS/CCMMENTS
              START DATE  10/76     EGUII-KENT: GAS DAMPER
              END DATE    10/78     PROBIEM: NOT DE FINED/SPE CI FI ED
                           B»PASS DAMPER I'ROBLfMS WERE EXPEDIENCE.
              AFFECTED MODULES: SYSTEM

        •*  PROBLEMS/SOLUTIONS/COMMENU
              START DATE  10/7B     EOUI^ENT: F6D SYSTEM, GENERAL
              END DATE    10/78     COMMENTS:
                           AN 502 CONHIINCE TEST WAS  INVALID  DUE  TO  P.VPASS  DAMPER  PROBLEMS.
              AFFECTED MODULES: SYSTEM

 11/78   SYSTEM                                                                  7ZO

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  11/76     EQUIPMENT: REAGfNT HANDLING
              END DATF    11/78     PRODIEM; WEATHER-RELATED COMPONENT  FAILURE
                          FPEm-UPS  IN THE LIME DELIVERY SYSTEM WERE EXPERIENCED
              AFFECTED MODULES: SYSTtM

        *«  PROaLEMS/SOLUTIONS/COMMENTS
              START DATE  11/76     E6UHMENT: INSTRUMENTATION
              END DATE    11/76     PROBLEM: NOT DEFINED/SPECIFIED
                          AN  INSTRUMENTATION POWER TRANSFORMER  FAILURE  CAUSED ABOUT 6 DAYS OUTAGE.
              AFFECTED MODULES: SYSTEM

 1Z/78   SYSTEM                                                                 744

        •» PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  1Z/78     EOUlfHENT: FGD SYSTEM,  GENERAL
              END DATE     1/79     COMMf.NTS:
                           OPERATIONAL HCIIRS ARE NOT VET AVAILABLE.  THE UTILITY REPORTED THAT THE
                           SYSTEM HAS NO 1 YET SEEN ACCEPTED.
              AFFECTED MODULES: SYSTEM

  t/79   SYSTEM                                                                 744
                                                 100

-------
                                            EPA UTILITY FGD SURVEY: DECEMBER 1V78 - JANUARY 1979
                                          SECTION 3
                   DESIGN AND PERFORMA&CE DATA FOR OPERATIONAL F6D SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - NG/J
SO? EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - HH
GROSS UNIT GENERATING  CAPACITY - »t>
NET UNIT GENERATING CAPACITY W/F6D - Mk
NET UNIT GENERATING CAPACITY WO/F6D -  I'V
EQUIVALENT SCRUBBED CAPACITY - MU

** BOILER DATA
    SUPPLIER
    TYPE
    SERVICE LOAD
    COMMERCIAL  SERVICE DATE
    MAXIMUM BOILER  FLUE 6AS  FLOW - CU."/S
    FLUE  GAS TEMPERATURE  -  C
    STACK HEIGHT  •  M
    STACK TOP  DIAMETER -  M

 •*  FUEL  DATA
     FUEL  TYPE
     FUEL  GRADE
    AVERAGE  NEAT  CONTENT  -  KJ/KG
     RANGE HEAT  CONTENT -  BTU/L6
     AVERAGE  A$H CONTENT - X
     RANGE  ASH  CONTENT  - X
     AVERAGE  MOISTURE CONTENT -  X
     RANGE MOISTURE  CONTENT  - %
     AVERAGE  SULFUR  CONTENT  - X
     RANGE SULFUR  CONTENT  -  I
     AVERAGE  CHLORIDE CONTENT -  X
     RANGE  CHLORIDE  CONTENT  - (
     FUEL  FIRING RATE - M  T/H
     FUEL  FIRING RATE - MU

 «* FUEL DATA
     FUEL  TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT  -  KJ/KG
     RANGE HEAT CONTENT - BTU/LB
     AVERAGE ASH CONTENT - X
     RANGE ASH  CONTENT  - X
     AVERAGE HOISTURE  CONTENT -  X
     RANGE MOISTURE CONTENT  - X
     AVERAGE SULFUR CONTENT  - X
     RANGE SULFUR CONTENT - X
     AVERAGE CHLORIDE  CONTEXT'-  X
     RANGE CHLORIDE CONTENT  - >
     FUEL FIRING RATE  - M T/H
     FUEL FIRING RATE  - MU

 •* FGD SYSTEM
     SALEABLE PROOUCT/THROUAWAY  PRODUCT
     GENERAL PROCESS TYPE
     PROCESS TYPE
     SYSTEM  SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     PARTICULATE DESIGN REMOVAL  EFFICIENCY
     S02 DESIGN REMOVAL EFFICIENCY - X
     INITIAL START.-UP

 ** ABSORBER
    KANSAS CITY POWER R LIGHT
    HAWTHORN
    KANSAS CITY
    MISSOURI
    B
       8?.
    ******
      K36.0
      110.0
       98.0
      100.0
      110.0
     TYPE
     INITIAL START UP
     SUPPLIER
     DIMENSIONS
     SHELL MATERIAL
     SHELL LINER MATERIAL
(  .190 LB/MMBTU)
(»***** LB/MMBTU)
    COMBUSTION ENGINEERING
    DRY POTTOM, PULVERIZF.D-COAL
    CYCLIC
     0/53
      235.95       < 500000 ACFM)
      148.9        ( 300 F>
       61.         < ZOO FT)
    *******        {***** FT)
    CO»L
    BITUMINOUS
     22795.

       11.00
    ******
    ********
    ******
          .60
    ******
    ********
    ******
       45.3
    *****
    COAL
    BITUMINOUS
      26516.

        u.oo
    ******
    ********
    ******
         3.00
    ******
    ********
    « *****
        45.3
    *****
<  9800 BTU/LP)
 ******
( 50 TPH)
( 1UOO BTU/Lfi)
 ******
 ( 50 TPH)
     THROVAUAY  PRODUCT
     WET  SCRUBBING
     LIME
     COMBUSTION ENGINEERING
     BLACK  AND  VEACH
     FULL-SCALE
     RETROFIT
. X    99.0Q
       70.00
     11/72
     MARBLE BED
     11/72
     COMgUSTION ENGINEERING
     18 X 26 X 56
     CARBON STEEL
     CEILCOTE
                                               101

-------
FPA UTILITY  FED SURVEY:  DECtKBER 1«7f - JANUARY 1979
                                            SECTION 3
                     DESIGN AND PERFORMAKE DATA FOR OPERATIONAL  FED  SYSTfMS
      INTERNAL  MATERIAL
      NUMBER  OF NOJ7LFS
      PRESSURE  DROP - KPA
      SUPERFHAL GAS VELOCITY - K/SEC

  **  fANS
      TYPE

  •*  MIST  ELIMINATOR
      NUMPER
      TYPE
      CONSTRUCTION MATERIAL
      CONFIGURATION
      NUMBER  OF PASSES
      FREFBOARD DISTANCE - M
      DEPTH . M
      VANF  SPACING - CM
      VANF  ANGLES
      WASH  SYSTEM
      PRESSURE  DROP - KPA

  **  PROCESS  CONTROL CHEMISTRY
      CONTROL VARIABLES
      CONTROL RANGE

  **  TANKS
      SERVICE
      S02 SCRUBBER TOWER HOLCUP

  ** REHEATER
      TYpf
      HEATING MEDIUM

  ** THICKENER
      NUBPER
      DIAMETER - M

  ** WATER LOOP
      TYpE

  ** SEA6FNT PREPARATION EQUIPMENT
      NUMBER OF SLAKERS
      SLAKER CAPACITY - M T/D

  •* TREATMENT
      TYPE
      SUPPLIER

  «* DISPOSAL
      NATURE
      TYPE
      LOCATION
      AREA - ACRES
      CAPACITY - CU.H
                                         316L SS
                                            6f
                                             ?.?         (13.0  IN'HZO)
                                             3.0         (  10.0  FT/S)
                                         SCRUBBER  l.D.
                                          2
                                         CHEVRON
                                         FIBERGLASS
                                         HORIZONTAL
                                             2
                                             J.05        <10.0  FT)
                                               .18        <   .6  FT)
                                             7.6         t  2-00  IN)
                                         45 DEG.
                                         EI6HT WASH  LANCES;  CLARIFIED  AND HAKE-UP WATER
                                               .4         (  1.5  IN-H20)
                                         PH
                                                 NUMBER

                                                 • ***
IN-LINE
HOT WATER
                                           1
                                            35.1


                                          CLOSED
                                              1
                                             51.7
                                                          150  PSI6
               (115 FT)
                                                         (  57.0  TPH)
                                          SOME  STABILIZATION  FROM FLYASH
                                          NONPROPRIETARY
                                          FINAL
                                          UNLINED  POND
                                          ON-SITE
                                            160.0
                                             31JOB80      (   2SAO.O ACRE-FT)
 ....................—....	...._—.	.PERFORMANCE  DATA-------—-———— — — — ......_..—._
 PERIOD MODULE AVAILABILITY  OPERABUITY  PLIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  FGfi    CAP.
                                                                  S02  PART. HOURS HOURS  HOURS  FACTOR
  7/75
3A
3B
SYSTEM
                                 42.0
                                                                               74*   58*
        ** PROBLEMS/SOtUTIONS/COKMENTS
              START DATE   7/75      E8UI H^NT:  F6D  SYSTEM,  6ENERAL
              tND DATE     7/75      COMMENTS:
                           A-PIOBULE  EUCOINTERED  A LEAK IN THE CITY WATER LINE.
              AFFECTED MODULES:  3A

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   7/75      EBUinwENT:  DUCTWORK
              END DATE     7/75      PROPlEMr CHEMICAL-RELATED PLU66IN6
                                                 102

-------
                                              EPA UTILITY F6D SURVEY: DECEMBER 1978 - JANUARY  1979
                                            SECTION 2
                    DESIGN  AND  PERFORMAKCE  DATA FOR OPERATIONAL FED SYSTEMS
_.	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY  OPERABUITY  fFLIABILITY UTILIZATION  X REMOVAL   PER  BOILER  F6ft   CAP.
                                                                 SOZ  PART. HOURS HOURS  HOURS  FACTOR

                           ThE 6UCT TO Tit  I.(. FAN BECAME PLUGGED.
              AFFECTED MODULES:  JA

       **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    7/75      EOUir«ENT: GAS DAMPER
              END  SATE      7/75      Pf'OBiF.M: MECHANICAL-RELATED COMPONENT INEFFICIENCY
                           At OUTLET DAMIF.R IN MODULE A MALFUNCTIONED.
              AFFECTED MODULES:  3A

       **  PROELEMS/SOLUTIONS/COMMENTS
              START  DATE    7/75      EGUIFWENTI ABSORBER
              tND  DATE      7/75      PROBLEM: NOT DEFINED/SPECIFIED
                           MARBLES kim  LOST FROM THE BED IN MODULE B.
              AFFFCTEt  MOftULtS;  JK

       **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    7/75      t6LI!WENT! PIPING
              END  DAir      7/75      PROBt.fMt MECHANICAL-RELATED COMPONENT FAILURE
                           A SPRAY HtADFF WAS BROKEN IN MODULE B.
              AFFECTED  MODULES:  SB
  8/75
  9/75
 10/75
 11/75
3A
SP
SYSTEM                                                                 744

** PROILIMS/SOLUTIONS/CCMMENTS
      START BATE   P/75     E6UII^£NT:  FAN
      END DATE     fi/75     mOBUM: NOT DEFINED/SPECIFIED
                   TH I.D. rAK  (OR HALf THt iQlLlR  hAS  LOST.
      AFFiCTED MODULES: SVSUM

** PROBLEMS/SOLUTIONS/COMMENTS
      START DATE   8/75     ECUIFPENT;  F6D SYSTEM, GENERAL
      END DATE     B/75     COMMBMTS:
                   TK PROBLEMS  FK'COUNTERED  IN  JULY  CONTINUED  INTO  AUGUST.
      AFFECTED MODULES: SYSTEM
3A
3f
SYSTEM
69.0
Z3.0
                                                                               720    358
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    9/75      EGUDHENT:  FGD  SYSTEM,  GENERAL
              END DATE      9/75      COMMENTS:
                            OUTAGE  DUE TO CLEANING AND  MECHANICAL  REPAIRS.  POTS,  COVERS,AND  MARBLES  IN
                            TtiE MARBLE BFD  OF MODULE  JP  WERE  REPLACED*
              AFFECTED MODULES:  SYSTEM
3A
3P
SYSTEM
65.0
81.0
                                                                               744    180
        ** PROBLEMS/SOLUTIONS/CCMMENTS
               START  DATE   10/75      EOUU'MENT:  RECYCLE  PUMP
               END DATE     lQ/75      PFOPHM:  NOT  DEFINED/SPECIFIED
                            MODULE  3A OUTAf,E  UA S DUE  LARGELY  TO  REPLACEMENT OF  A RECYCLE PUMP MOTOR.
               AFFECTED MODULES:  3A

        ** PROBLEMS/SOLUTIONS/COMMENTS
               START  DATE   10/75      teUITMENTt  BOILER-RELATED
               END DATE     10/75      COKMENT:  PREVENTIVE MAINTENANCE SCHEDULED  UNIT OUTAGE
                            A  SCHEDULED  B1ILER OVERHAUL  REDUCED  BOILER OPERATION HOURS*
               AFFECTED MODULES:  SYSTEM
        3B
        SYSTEM
                                                                       720
                                                 103

-------
EPA UTILITY  FGD SURVfY:  DECEMBER 197E - JANUARY 1979
                                            SECTION 3
                     DESIGN AND PERFOKKAKE DATA FOR OPERATIONAL F6D SYSTEMS
	PERFORMANCE DATA	    ...   ,.p
PERIOD  MODULE  AVAILABILITY OPERABUITY  PLIABILITY UTILIZATION  X  REMOVAL    PER   BOILER  FbD   *"^»
                                                                 SO?   PART.  HOURS  HOURS  HOURS FACTOR


        ** PRObLEMS/SOLUTIONS/COMMENTS
              ST»RT DATE  11/75     EOUH^ENT: R01LER-RELATE D
              END DATE     1/76     CCMMENTSI                                            „ -BU»i,i   THE
                           BCILFRS AMD SCRUBBERS WERE  SHUT DOWN  FOR A  SCHEDULED  TURBINE OVERHAUL. THt
                           SYSTEM IS SCHt.DUCED TO 60  PACK ON-LINE  IN JANUARY 1976.  SYSTEM WAS DO«N
                           ALL MONTH PFCHISE OF FR07EN EBUIPCENT AND LINE  AND A  MANPOWER SHORTAGE
                           TC A EOILIF" AKO TURblNE OVERHAUL  ON ANOTHER  UNIT  AT  THIS STATION.
              AFFECTED MODULES: SYSTEM

        3*
        36
        SYSTEM                                                                 744

  1/76  3A
        3P
        SYSTEM                                                                 744

  2/76  3A                      37.0
        3fl                        1.0
        SYSTEM                                                                 4*6    503

        ** PROBLEMS/SOLUTJONS/COMMEN1S
              START DATE   2/76     f'UI^'ENT:  SCPUPBITR
              END  DATE     2/76     H>CfUM: CHEMICAL-RELATED  PLUGGING
                           SCRUBBER OUTAtfS  RESULTED  FROM  PLUGGING IN  THE  SCRUBBER PED. CAUSED PY
                           CONVfRSlON  fRCW AN  UNDER-BF.O  TO OVER-BED S'PRAY  SYSTEM.
              AFFECTED  MODULES: SYSTEM

  3/76  3A

        SYSTEM                                                                 744

        ** PROSLEMS/SOLUTIONS/COMMENTS
              START DATE   3/76     EGUJFKENT:  SCRUBBER
              END  DATE     4/76     COMMtNTSs
                           RECONVIRSICN  (F MODULI  3B'S SPRAY SYSTEM TO AN  UNDFR-ilD CONFIGURATION HAS
                           BtIN COMPLETE I.
              AFFECTED  MODULES: 3B

        ** PROBliMS/SOLUTIONS/COMMENTS
              START DATE   3/76     tOUllf|NT:  6AS  DAMPER
               END  DATE     4/76      CQKMCNTS:
                           TK  PYPASS  SYSTEM HAS  BEEN MODI FJ10 AND CHANGED  TO A SLIDE-€ATE  PAMPER
                           ARRANGEMENT.
              AFFECTED  MODULES: 39

  4/76  3*
        3P
        SYSTEM                                                                 710

  5/76  3A
        ip
        SYSTEM                                                                 744

        ** pROBLENS/SOLUnONS/COMMENn
              START DATE   5/76      E6UIMENT: F6D SYSTEM, GENERAL
               |ND  OATE     S/76      COMMtNTSs
                           THE  SYSTEM  WAS SHUT DOWN  DURINf. THE MONTH  DUE  TO THE CONTINUATION OF  MAN-
                           POWER  SHORTAGE PROBLEMS.  THE UTILITY DID PMFORM SOME  CLEANING AND REPAIRS
                           DURING THE  MOhTH.
              AFFECTED  MODULES:  SYSTEM

  6/76  3A                       39.0
        3B                       **.0
        SYSTEM                                                                  '20   505
                                                 104

-------
                                                EPA  UTILITY F6D  SURVEY: DECEMBER  1978  - JANUARY 1979
                                              SECTION 3
                     DESIGN  AND PERFORMANCE  DATA FOR OPERATIONAL  F60 SYSTEMS
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY  OPERABIL1TY  PLIABILITY UTILIZATION   X REMOVAL   PER   BOILER  F6D   CAP.
                                                                    S02  PART. HOURS  HOURS  HOURS FACTOR


       **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    6/76     EQUIPMENT:  HIST ELIMINATOR
              END DATE      6/76     PROBLEM: NOT DEFINED/SPECIFIED
                            THE UTILITY  IS  IN THE PROCESS OF  MODIFYING THE DEMISTER WASH SYSTEM ON
                            BOTH UNITS 3  fND  4.  THE WATER LANCES  ARE BEING CHANGED  FROM FRP TO CARBON
                            STEEL TO ATTEMPT  TO  PREVENT THE  LCSS  OF THE NOZZLES AND THE SUBSEQUENT
                            SCATTERING OF THE LANCES.
              AFFECTED  MODULES! SYSTEM

  7/76   SYSTEM                                                                    744

        ** PROfilEMS/SOLUTIONS/COKMENTS
              START DATE    7/76     EQUIPMENT:  F6D SYSTEM,  GENERAL
              END DATE      8/76     CCHMfNTS:
                            THE UTILITY  IS  PRESENTLY CONVERTING  THIS SYSTEM FROM LIMESTONE INJECTION
                            AND TAIL END  SCRUBBING TO A LIME  SLURRY BASED SCRUBBING SYSTEM.
              AFFECTED  MODULES: SYSTEM

  8/76   SYSTEM                                                                    744

  9/76   SYSTEM                                                                    720

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    9/76     E6UIfl«ENT:  F6D SYSTEM,  GENERAL
              END DATE     10/76     COMMENTS:
                            THE SYSTEM WAS  VIRTUALLY OUT OF  SERVICE THE ENTIRE  REPORT  PERIOD. MANPOWER
                            COMMITMENTS  WERE  SERIOUSLY HAMPERED  BY A MAJOR EXPLOSION WHICH OCCURRED IN
                            TtE COAL MILL PULVERIZING AREA  OF HAWTHORN NO. 5.
              AFFECTED  MODULES: SYSTEM

 10/76   SYSTEM                                                                    744

 11/76   3A
        3B
        SYSTEM                                                                    720

        ** PR08LEMS/SOLUTIONS/COMKENTS
              START  DATE   11/76     EfiUI FMENT:  F6D SYSTEM,  GENERAL
              EN6 DATE     12/76     COMMENTS:
                            THE UNIT DID NOT OPERATE BECAUSE  OF  THE ONGOING MAJOR MODIFICATIONS BEING
                            IMPLEMENTED  0 It  THE SCRUBBING SYSTEM. THE SYSTEM SHOULD  BE  READY FOR OPERA-
                            TION FEB 1.  TFE UNIT MUST UNDERGO A  SERIES OF TESTS TO  INSURE COMPLIANCE
                            WITH CITY  AND FEDERAL  REGULATIONS.
              AFFECTED  MODULES: SYSTEM

 12/76  3A
        3B
        SYSTEM                                                                    744

  1/77  3A
        36
        SYSTEM                                                                    744

        ** PROBLEMS/SOLUTIONS/COMMENTS
              ST*RT  DATE   1/77     EQUIPMENT: FGD SYSTEM. GENERAL
              £HD  DATE      3/77     COMMENTS:
                           UNIT NO.  3  WAS DOWN FOR  THE  ENTIRE MONTH OF JANUARY  FOR  THE COMPLETION  OF
                            MCNDIFICATIONi  AND REPAIRS  ON  THE SCRUBBERS AND BOlLER. THE UNIT  BECAME
                            AVAILABLE  FOR SERVICE  AND TESTING ON  FEE 7.THE UNIT'S  MEASURED PARTICULAT£
                            EMISSIONS  AT 1HE SCRUBBER OUTLET WAS  0.12 LB/MM BTU (WELL BELOW THE
                            REQUIRED 0.17 LB/MM BTU)  BURNING APPROXIMATELY 2.0  z  SULFUR COAL.  THE
                            CONVERSION FRCM LIMESTONE TO  LI«F HAS GONE SMOOTHLY-  SOME INITIAL  PROBLEMS
                            WITH PROCESS CHEMISTRY CONTROL HAVE  BEEN CORRECTED. OTH£R «INOR PROBLEMS
                            INCLUDED  PUMP MALFUNCTIONS  AND LOSS  OF  SLAKIN6 WATER  PRESSURE. SYSTEM
                            OPERATIONS ARi  CONTINUING  AT  OX SOLIDS  AND 100* BLOWDOttN WITH A FRESH
                           WATER MAKE-UP CF APPROXIMATELY  7.0 6PM/MW.
                                                   105

-------
EPA UTILITY  FGO  SURVFY: OECCMBEf 197fr - JANUARY 1979
                                            SECTION  3
                     DESIGN AND PERFORMANCE DATA FOR OPERATIONAL F6D SYSTEMS
                                            PERFORMANCE  DATA	"T«rw    r»B
PERIOD  MODULE  AVAILABILITY flPERABlLITI  PLIABILITY  UTILISATION   X REMOVAL   PER  BOILER   F6D    S*r-
                                                                  302  PART. HOURS HOURS  HOURS  FACTOR
2/77  3A
      36
      SYSTEM
  3/77
  4/77
  5/77
  7/77
              AFFECTED MODULES: SYSTLM

                                £8.0
                                t<>. 0
                                                                   .00
                                                                       672    383
3»
3B
SYSTEM

3A
3B
SYSTEM
                                99.0
                                85.0
                                 57«0
                                 57.0
                                                                               744
                                                                                    482
                                                                               72Q   7ZO
        »* PR06LEMS/SOLUTIONS/COMMENTS
              START DATE   4/77      ECUIfl»ENT:  FED  SYSTEM,  GENERAL
              END DATE     5/77      COMMITS:
                           ThE SYSTEM  IS  NOW OPERATING  AT  ABOUT 15-25 PERCENT SLOWDOWN.THE  PH  CONTROL
                           SYSTEM OPERATIONS HAVE  BEEN  EXCELLENT.DURING HAY THE BOILER BURNED  GAS  FOR
                           216 HOURS  (NO I INCLUDED  IN  OPERAEILITY FIGURES). SQ2 REMOVAL  EFFICIENCY IS
                           ESTIMATED  AT  ".(7-60  PERCENT  FOR  BOTH MODULES tALTHOU6H ACTUAL TESTS HAVE  NOT
                           BEEN  RUN  FOR  ABOUT  A  Y£AR  AND A  HALF. BOTH MODULES ARE CURRENTLY  OPERATING
                           SIMULTANEOUSLY.
              AFFECTED MODULES:  SYSTEM
        3A
        3B
        SYSTEM
                         5S.O
                         58.0
  6/77  SYSTEM
                                                                       744

                                                                       720
                                                                                    736

                                                                                    720
        ** PROBLEMS/SOLUT10NS/COKMENTS
              START DATE   6/77      16UIFMENT:  B01LER-RELATFD
              END DATE     6/77      COMPtNTS:
                           ThE UNIT  FIRES  NATURAL  GAS THROUGHOUT THE MONTH WITH THE  EXCEPTION  OF A
                           72-HOUR PtflOl  DURING WHICH COAL MS FIRED AND THE SCRUBBERS  MERE OPERATED
                           FOR SCRU&BfR  FfRSONNEL  PURPOSES  ONLY.
              AFFECTED MOBULESj  SYSTEM

           PROBLEMS/-SOLUTIONS/COMMENTS
              START DATE   7/77      tBUIf'MENT:  BOILER-RELATED
              END DATE     9/77      COWW tNTS:
                           TtiE UNIT  FIREt  NATURAL  GAS FOR THE ENTIRE PERIOD, MAKING  SCRUBBER  OPERATION
                           UNNECESSARY.
              AFFECTED MODULES:  SYSTEM
        3A
        3d
        SYSTEM
                         10.0
                         10.0
  8/77  SYSTEM

  9/77  SYSTEM

 10/77  SYSTEM
                                                                        744

                                                                        744

                                                                        720

                                                                        7*4
                                                                                      744
                                                                                      744
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   10/77      ECU1FKENT:  BOILER-RELATED
              END DATE     1l/77      COMMENTS:
                           THE UNIT  WAS  SHUT DOWN BECAUSE OF A LACK OF NATURAL  GAS  UNTIL NOVEM8FR 3*
                           WHEN  IT BEGAN  FIRING COAL. 
-------
                                              EPA UTILITY FGO SURVEY:  DECEMBER  1978 - JANUARY 1979
                                            SECTION 3
                     DESIGN  AND  PERFORKAKE DATA FOR OPERATIONAL  FGD  SYSTEMS
------------------------------------------ PERFORMANCE DATA ------------------------------------------
PERIOD MODULE AVAILABILITY OPERABILITY PLIABILITY UTILIZATION   X  REMOVAL    PER  BOILER  F60   CAP.
                                                                  S02   PART. HOURS HOURS  HOURS FACTOR
™ *"•"* •"* *™ • •• »™ «- — «-«l_  _<•«_•»  _•«,__ V ••»••. BK •••   »» -1 fc -i • «••••»•-

       ** PROBLEMS/SOLOT10NS/COMNENTS
              START  DATE   10/77     EGUIftfENT: ABSORBER
              END  DATE     11/77     PRCBIFB: NOT DEFINED/SPECIFIED
                           DURING eOILER DOWN TI|"E,THF REACTION  TANKS  AND  SPRAY HEADERS WERE REPLACED
                           BY STAINLESS STEEL COMPONENTS;  THE  INTERCONNECTING PIPING Is RUBBER LINED.
              AFFECTED  MODULES: SYSTEM

11/77  SYSTEM       57.0                                                        720   720   4110

12/77  SYSTEM       47.0                                                        744   744   3460

       ** PROBLEWS/SOLUT10NS/CCMMENTS
              START  DATE   12/77     t CiUI f WENT: FGD SYSTEM, GENERAL
              END  DATE      1 /7«     COKMFNT: PREVENTIVE MAINTENANCE
                           THE FG6 MODULES WERE CLEANED DURING BOILER  OUTAGES (THERE WERE NO FGD-
                           RELATF.D OUTAGfS).
              AFFECTED  MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/CflttHENTS
              START  DATf   12/77     tOUIfWENT: PIPING
              END DATE      1/78     PROBLEM: MECHANICAL-RELATED  COMPONENT  INEFFICIENCY
                           SOME LEAKS  IN THE FED PIPING WERE  REPLACED.
              AFFECTED  MODULES: SYSTEM

  1/7E   SYSTEM                                                                 7«4   7*4

  Z/78   SYSTEM      30.0                                                       672   672   1V80

        **  PROBLEMS/SOLUTIONS/CnPMENTS
              START DATE   2/76     ESUII'MENT: BOILER-RELATED
              END DATE      3/78     PROBLFM: CHEMICAL-RELATED EROSION
                           DIKING FEKRUAKY THE UNIT WAS DOWN  FOUR TIMES  WITH ECONOMIZER AND WATER
                           WAIL LEAKS(5(H HOURS TOTAL). WATER WALL  LEAK  REPAIR AS WELL AS ACID
                           CLEANING or  THE BOILER  CAUSED  ADDITIONAL OUTAGE  TIME DURING THE LAST WEEK
                           OF MARCH.
              AFFECTED  MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   lilt     66UI ffiENT: BOI LER»R|!LATE D
              END (ATE     3/78     COMMENT; PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                           A TWO WEEK  OUTAGE WAS SCHEDULED DURING MARCH  FOR SEASONAL MAINTENANCE.
              AFFECTED  MOBULfcS: SYSUM
  3/78  SYSTEM      6J.O                                                       7*4   7**

  4/78  SYSTEM                                           44.0                  7?0   T20   3270

        ** PROBLEMS/SOLUT10N&/COMMENTS
              START DATE   4/78      EOUI'MENT:  DUCTWORK
              END DATE     5/78      f'RCBlEMs  NOT  DE FINED/SPF CI FIEO
                           AN  AlK PPt;H£A1FR  FIRE  DISCOVERED ON  HAT 12 CAUSED DAMAGES THAT FORCED
                           MODULE A  TO  e»  DOWN  THE  REST OF THE  MONTH.
              AFFECTED MODULES:  !A

        ** PROIiLEMS/SOLUTIONS/COMMtNTS
              START DATE   6/78      EQUIPMENT:  FGD  SYSTEM, GENERAL
              END DATE     7/71      COMMtNTSt
                           NC  INFOmilOh  WAS AVAILABLE FOR THE JUNi-JULY REPORT PERIOD DUE TO A PLAN
                           STRIKE.
              AFFECT6D MODULES:  SYSTEM

  S/7S  SYSTEM                                                                 744   744

  tin  SYSTEM                                                                 720

  7/78  SY8T1M                                                                 744
                                                 107

-------
EPA UTILITY  F&D  SURVEY:  DECtMPER 197f - JANUARY 1979
                                            SECTION  3
                     DESKN AND fERFORMAKCf DATA FOR OPERATIONAL  F«D SYSTFBS
PERIOD HOODIE  AVAILAP1L1TV OPERAPUITY KELIA&1LITY UTILIZATION   *  REMOVAL    PER  BOILER  FGD    CAP-
		  	                                                  S02  PART. HOURS HOURS  HOURS  FACTOR

 6/7R   SYSTEM
                                                                               744

        •*  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    8/78     E6UKKENT: FGD SYSTfU. gtNtRAt
              ENC  DATE      9/78     COMMENTS:
                           THE SCRUBEIK6 SYSTEM IS OPERATING EVEN THOU6H  THE  UTILITY IS STILL IN THE
                           H1DST OF A STFIKE. FGD PERFORMANCE FIGURES  ARE NOT AVAILABLE SINCE THE
                           UTILITY u *(n RECORDING FGD SYSTEM OPERATING  HOURS  DURING THE STRIKE.
              AFFECTED  MODULES: SYSTEM

 9/78   s*STE»                                                                  720

10/78   SYSTEM                                                                  744

        **  PROBLEMS/SOLUTIONS/CCHMENTS
              START  DATE   10/78     EOUlfMENT: FGD SlfSTEH, eENERAl
              END  DATE     11/78     COMMtf.TS:
                           ALTHOUGH THE  STRIKE IS OVER NO OPERATIONAL  DATA  IS AVAILABLE.   THE FC-D
                           SYSTEM IS  IN  OPERATION.
              AFFECTED  MODULES: SY$*

11/78   SYSTEM                                                                 720

12/7B   SYSTEM                                                                 744

        **  PRObLEMS/SOLUTIONS/COMMENTS
              START  DATE   12/78    ESUITPENTl FGD SYSTEM, GENERAL
              £No  DATE      1/79    COMMfNTS:
                           HOURS  OF OFER-'TjON ARE  STILL NOT AVAILABLE.  THE FGD SVSTEM  IS  IN  OPERATIC
                           BUT  AT  PRESENT  PERSONNEL  ARE BEING REASSIGNED PREVENTING  ACCURATE  DATA
                           RECORDING.
             AFFECTED  MODULES: SYS*

 1/79  SYSTEM                                                                 744
                                               108

-------
                                             EPA UTILITY FG6 SURVEY: DECEMBER 1978 - JANUARY 1979
                                           SECTION 3
                   DESIGN  AND  PERFORMANCE  DATA FOR OPERATIONAL F6D SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
C1T»
STATE
REGULATORY CLASSIFICATION
PARTKULATE  EMISSION  I IMITATION - K6/J
S02 EMISSION LIMITATION  -  MG/J
NET PLANT GENERATING  CAPACITY  - FtV
CROSS UNIT GENERATING CAPACITY - Mh
NET UNIT GENERATING  CAPACITY W/FGD - M'.
NET UNIT GENERATING  CAPACITY WC/FGD - f-W
EQUIVALENT SCRUBBED  CAPACITY - MU

** BOILER  DATA
    SUPPLIER
    TYPE
    SERVICE  LOAD
    COMMERCIAL  SERVICE  DATE
    MAXIMUM  BOILER FLUE GAS FLOW - CU.P/S
    FLUE GAS TEMPERATURE - C
    STACK  HEI6HT  - M
    STACK  TOP  DIAMETER  - M

**  FUEL DATA
    FUEL TYPE
    FUEL GRADE
    AVERAGE  HEAT  CONTENT - KJ/KG
    RANEE  HEAT  CONTENT  - BTU/LB
    AVERAGE  ASH CONTENT - X
    RANGE  ASH  CONTENT - X
    AVERAGE  MOISTURE CONTENT - X
    RANGE  MOISTURE CONTENT - X
     AVERAGE  SULFUR CONTENT - Z
    RANGE  SULFUR  CONTENT - X
     AVERAGE  CHLORIDE CONTEKT - X
     RANGE  CHLORIDE CONTENT - X
     FUEL FIRING RATE - M T/H
     FUEL FIRING RATE - HW

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - KJ/KG
     RANGE  HEAT CONTENT - B1U/LB
     AVERAGE ASH CONTENT - 2
     RANfE  ASH CONTENT - *
     AVERAGE MOISTURE CONTENT  - X
     RANGE  MOISTURE CONTENT -  X
     AVERAGE SULFUR CONTENT -  X
     RANGE SULFUR CONTENT - X
     AVERAGE CHLORIDE CONTENT  - X
     RANGE  CHLORIDE CONTENT -  Z
     FUEL FIRING RATE - M T/H
     FUEL FIRING RATE - »U

 ** FGD SYSTEM
     SALEABLE PRODUCT/THROWAUAY PRODUCT
     GENERAL PROCESS  TYPE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIfm
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     PARTICULATE DESIGN  REMOVAL EFFICIENCY
     So2 DESIGN REMOVAL  EFFICIENCY  -  X
     INITIAL START-UP

 ** ABSORBER
     NUMBER
     TYPE
     INITIAL START UP
     SUPPLIER
     DIMENSIONS
     SHELL MATERIAL
     SHELL LINER MATERIAL
KANSAS cm POWER » LIGHT
HAWTHORN
                (   .190 LR/MMBTU1
                (****** LB/MMBTU)
KANSAS CITY
MISSOURI
B
   8?.
******
  83A.O
  110.0
   98.0
  10D.O
  110.0
COMBUSTION  ENGINEERING
DBY BOTTOM, PULVERIZFD-COAL
CYCLIC
 0/55
  235.95
  148*9
   61.
*******
COAL
BITUMINOUS
 2J795.

   11.00
******
********
******
      .60
******
***** ***
******
   45.3
*****
COAL
BITUMINOUS
  26516.

    14.00
******
********
******
     3.00
******
***** ***
******
    45.3
*****
                (  500000 ACFFi)
                (  300  F>
                C  ZOO  FT>
                (*****  FT)
                (   9800 BTU/Lfl)
                ******
                (  50 TPH)
                C  11400  BTU/LEO
                ******
                f 50 TPH)
 THROWAWAY  PRODUCT
 b£T SCRUBBING
 LIMg
 COMBUSTION ENGINEERING
 BLACK  AND  VEACH
 FULL-SCALE
 RETROFIT
    99.00
    70.00
  8/72
 MARBLE BED
  8/72
 COMgUSTION ENGINEERING
 18 X 26 X 5
-------
EPA UTILITY F6D SURVEY:  DECEMBER  197?  - JANUARY 1979
                                            SECTION 3
                     DESIGN  AND  PERFOFMAKCE DATA FOR OPERATIONAL FGD SYSTEMS
      INTERNAL  MATERIAL
      NUMPER  OF  NOZZLES
      PRESSURE  DROP  - KPA
      SUPERFICAL  GAS VELOCITY - M/SFC
                                               3UL SS
                                                  6^
                                                   7.2
                                                   3.0
               (13.0 IN-H20)
               C  10.0  FT/S)
  **  FANS
      TYPt

  *«  KIST  ELIMINATOR
      NUMPER
      TYPE
      CONSTRUCTION  MATERIAL
      CONFIGURATION
      NUMBER  OF PASSES
      FREEBOARD DISTANCE - *
      DEPTH . M
      VANE  SPACING  - CM
      VANC  ANGLES
      MASH  SYSTEM
      PRESSURE CROP - KPA

  **  PROCESS  CONTROL CHEMISTRY
      CONTROL VARIABLES
      CONTROL RANGE

  *•  TANKS
      SERVICE
      502 SCRUBBED TOWER HOLDUP

  •* REHEATER
      TYPE
      HEATING
  ** THICKENER
      NUMBER
      DIAMETER - M
                                               SCRUBBER I.D.
                                               CHEVRON
                                               FIBERGLASS
                                               HORIZONTAL
                                                   2
                                                   3.05        (10.0 FT)
                                                    .18        t   .6 FT)
                                                   7.6         < 3.00 IN)
                                               45 DEG.
                                               EIGHT WASH LANCES; CLARIFIED AND  MAKE-UP  WATER
                                                    .4         < 1.5 IN-H20)
                                               PH
                                               «.5-6.5


                                               NUMBER

                                               ****
                                               IN-LINE
                                               HOT WATER 325f, 150 PSIG
                                                  35.1
                                                               (115  FT)
  ** WATER LOOP
      TYPF

  ** REAGENT PREPARATION EQUIPMENT
      NUMBER OF SLAKERS
      SLAKER CAPACITY - M T/t

  ** TREATMENT
      TYPE
      SUPPLIER

  ** DISPOSAL
      NATURE
      TYPt
      LOCATION
      AREA - ACRES
      CAPACITY - CU.M
                                               CLOSFD
                                                    1
                                                   51.7
               ( 57.0 TPH)
                                               SOME  STABILIZATION  FPOM  FLYASH
                                               NONPflOPRIETARV
UNL1NEO POND
ON-SITE
  160. 0
   213088Q
                                                               (  2560.0 ACRE-FT)
 	—..	...	PIRFORMANCF,  DATA	..................................
 PERIOD NODULf AVAILABILITY CAPABILITY  FtLIAbJLITY  UTILIZATION   X REMOVAL   PER  BoILER  FGO   CAP.
                                                                  S02  PART. HOURS HOURS  HOURS FACTOR
7/75  4A

      SYSTEM
                                 g.O
                                                                               744   518
        «* PROBLEMS/SOLUTIONi/COMMENTS
              START BATE   7/75      ICUlFPENTi  ABSORBiR
              END DATE     7/75      PROBirHl  CHEMlCAL-RELATfC PLU6GIMC
                           BOTH  MODULES  TNCOUNTERED  MARBLE  BED PLUG61N6 AND STRAINER PROBLEMS.
              AFFECTED MOBULtS:  SYSTEM
  8/75  4«
                                                 110

-------
                                              EPA UTILITY FCC SURVEY:  DECEMBER  1978  - JANUARY
                                            SECTION 3
                    DESIGN  AND  FERFOR«AI\CE DATA FOR OPERATIONAL  FGD  SYSTEMS
	.	PERFORMANCF DATA	•	——	.—.	
PERIOD NODULE AVAILABILITY  CPERABILITY (PLIABILITY UTILIZATION  Z  REMOVAL    PER   BOILER  FED   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR

       *B
       SYSTEM                                                                  744

       ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   8/75     Efltl WENT:  F60 SYSTEM,  GENERAL
              END  DATE      8/75     CCMMfNTS:
                           A NEW PROCESS CHEMISTRY is BEING  TRIED-  ATTEMPT INS TO  RUN AT 1001 SLOWDOWN
                           AKD NEAR ZERO PERCENT SOLIDS  WITH PH  BEING  MAINTAINED  AT 5 WITHOUT LIME
                           STONE INJECTION. EMPHASIS  IS  BEING PLACED ON  PARTICULATE CONTROL.
              AFFECTED  MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/COMNENTS
              START  DATE   8/75     EfiUIH*;ENT:  FAN
              END  DATE      fl/75     PSOBUM: NOT DEFINED/SPFCIFIED
                           LOST HALF OF TOILER  TO  I.D. FAN  OUTAGE  CAUSING BOTH FGD MODULES TO BE SHUT
                           DCUN TO PREVENT LOSS OF THE ENTIRE UNIT.
              AFFECTED  MODULES: SYSTEM

  9/75   4*                       52.0
        4P                       53.0
        SYSTEM                                                                 720   3'5

        ** PROBLEMS/SOLUTIONS/CCMMENTS
              START DATE   9/75     L«UIf*ENT:  FGD SYSTEM,  GENERAL
              END DATE      9/75     COMMENTS:
                           SCRUPBER MODULES WERE RETURNED  TO SERVICE ON  SfPT. 21  AFTER REPLACEMENT OF
                           THE ORIGINAL  I.D. FAN ON NODULE  48 SIDE.
              AFFECTED  MODULES: SYSTbM

        **  PROtiLEMS/SOLUTIONS/COMMENTS
              START DATE   9/75     [GUITKENT:  SCRUBBER
              END DATE     9/75     COMMf-NTS:
                           THE HARBIE BED  WAS  REMOVED FROM  MODULE  A AND  REPLACED  WITH A STAINLESS
                           S7tEL PERFORATED BED. THf  MARBLES WIRE  REMOVED BECAUSE OF CONTINUING
                           OPERATIONAL  DIFFICULTIES.  NEVI DESIGN  RESULTED IN INCREASED AVAILABILITY
                           AKD CONTINUED HIGH  PARTICULATE  EFFICIENCY  (97 PERCENT).
              AFFECTED MODULES: 4A

 10/75  4A                       60.0
        4B                       91. t
        SYSTEM                                                                 7*4   721

        *«  PRO^LEMS/SOLUTIONS/COMMENTS.
              START DATE  10/75     LCUIF-MENT:  FGO SYSTEM,  GENERAL
              END DATE    10/75     COMMtNTS:
                           THE EXPERIMENT  WjTH  A PROCESS CHEMISTRY OF  100% BLOWDOWN AND ZERO PERCENT
                           SOLIDS  IS  STILL IN  PROGRESS.  S02 REMOVAL EFFICIENCY IS IN THE 50  TO 60
                           PERCENT  RANGE.  KCPfcL IS CONCENTRATING ON PARTICULATE  CONTROL.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  10/75     EOUIFMENT:
              END DATE    10/75     f-fOBIFM:  NOT DEFINED/SPECIFIED
                           THERE WAS  A  MINOR  BOILER  RESTRICTION ON THE A-SIDE BETWEEN  THE ECONOMIZER
                           AND THE  INLET  DRAFT  DUCT.
              AFFECTED MODULES: 4A

 11/75  4A
        4B                      99.0
        SYSTEM                                                                  72Q    720

        ** PROGLEMS/SOLUT10NS/COMMENTS
              START DATE  11/75     E6UIFMENT:  RECYCLE TANK
              END DATE    11/75     PROBIEM:  CHEMICAL-RELATED PLUGGING
                            MODULE  4A  WAS  SHUT DOWN DURING THE REPORT PERIOD  DUE  TO  LOSS  OF  DRAFT
                            THROUGH THE  DLCTWORK FROM THE ECONOMIZER TO THE  AIR PREHEATER,  RESULTING
                            IK FREQUENT PLUGGING OF THE REHEATER UNTIL THE  SYSTEM WAS  SHUT  DOWN.
                                                 111

-------
EPA UTILITY F6D SURVEY:  DECEMBER 197F  -  JANUARY 1979
                                              SECTION 3
                      DESIGN AND PERFORMAhCE PAT* FOR OPERATIONAL FGD SrSTFMS
	PERFORMANCE  DATA	"      ~
PERIOD MODULE AVAILABILITY CPERABILITY  KfLIABlLlTY UTILIZATION  * REMOVAL    PER  BOILER   FGO   CAP.
                                                                    S02  PART.  HOURS HOURS   HOURS  FACTOR
12/75
              AFFECTED  NODULES: AA
        4A
        4P
        SYSTEM
                          16.C
                                                                          744    640
  1/76
           PR00LEPS/SOLUTIONS/COMMENTS
              START  DATE  12/75      EeuiFKENT: BOILER-RELATED
              END  DATE     12/75      COMMtK'T: PREVENTIVE  MAINTENANCE SCHEDULED UNIT OUTA6E
                            TtC ECILEfc OU1A6E OF 5 DAYS WAS  DUE TO A SCHEDULED OVERHAUL.
              AFFECTED  MODULES: SYSTEM
        4A
        4E>
        SYSTEM
                                                                          744
  2/76
        «* PROBLEMS/SOLUTIONS/COKMENTS
               START DATE   1/76      E6UIH»ENT: F6D SYSTEM,  GENERAL
               END  DATE     1/76      PPCBtEM: NOT DEFINED/SPECIFIED
                            T*E SYSTEM  VKi DOWN ALL KONTH  DUE TO FROZEN  EQUIPMENT AND  LINES
                            WAS ASSIGNED  10 A BOILER AND  TURBINE OVERHAUL  ON ANOTHER UNIT.
               AFFECTED MODULES:  SYSTEH
                                                                                         MANPOWER
        4A
        46
        SYSTEM
                          78.0
                                                                                  696
                                                                                         579
        ** PROeLEWS/SOLUTIONS/COMRENTS
               START  DATE   2/76      CCUIIKENT: DUCTWORK
               END  DATE     2/76      fROBird: NOT DEFINED/SPECIFIED
                           MODULE 4A  WAS  SHUT DOWN THE  ENTIRE nONTH BECAUSE  OF CONTINUING  LOSS OF
                            DRAFT THROUGH THE DUCTWORK  FROH  THE ECONOMJSER  TO THE AIR  PREHEATER.
               AFFECTED MODULES: 4A

        ** PROBLEWS/SOLUTIONS/COHMENTS
               START  DATE   2/76      ECUjrKENT: SCRUPBFR
               tNO  DATE     2/76      PFOeiEH: CHEMICAL-RELATED PLUG6INE
                            MODULE e  EXPERIENCED PLUGGING  IN THE NARBLE  BED.
               AFFECTED MODULES: 46
  3/76
  4/76
 5/76
        «* PROBLEMS/SOLUTIONS/COMMENTS
               START  DATE   2/76      E6UIFKENT: RECYCLE  PUMP
               END  DATE     2/76      PROPlFM: NOT D E FINE D /SPE CI F I ED
                            A RECYCLE  PUH F BROKE DOWN  ON  THE B-SIDE.
               AFFECTED MODULES: 4D
        4A
        4E!
        SYSTEM
                           3.0
                                                                                  744
                                                                                         706
        •* PROBLEWS/SOLUTIONS/COKMENTS
              ST*RT  DATE   5/76      EfiUIFffENT: 6AS  DAMPER
              END  BATE      4/76      COMMENTS!
                            THE UNIT'S 6YFASS SEALS  WERE  REPLACED WITH SLIDE-BATE DAMPERS.
              AFFECTED  MODULES: SYSTEM
4A
4e
SYSTEM

4A
4B
SYSTEM
                                 42.0
                                 40.0
                                 27.0
                                 27.0
                                                                                  720    550
                                                                                  744
        ** PR06LEMS/SOLUT10NS/COMMENTS
              START  DATE   5/76      EOUIFMENT: RECYCLE TANK
              END DATE      6/76      PROBtFM: CHEMICAL-RELATED PLUGGING
                                                   112

-------
                                                EPA UTILITY FGD  SURVEY: DECFMBER  1978  - JANUARY 1°79
                                              SECTION 3
                     DESIGN  AND PERFOKMAfitE  DATA FOR OPERATIONAL  FGD SYSTEMS
_.	PERFORMANCE DATA-'	
PERIOD NODULE  AVAILABILITY  OPERAB1LITY  RELIABILITY UTILIZATION
                                                                    % REMOVAL   PER   BOILER  FGD    CAP.
                                                                    S02  PART. HOURS  HOURS  HOURS  FACTOR
                            OhE OF THE REPEAT TUBE BUNDLES  WAS  REMOVED TO FACILITATE  CLEANING AND
                            MAINTENANCE  D I.E  TO PLUGGING PROBLEMS.
              AFFECTED  MODULES: SYSTEM

        **  PROBLEMS/SOLUT10NS/COKMENTS
              START  DATE    5/76     EQUIPMENT: FGD SYSTEM,  GENERAL
              END DATE      6/76     COMMFNTS:
                            CtRRENTLY, THE  UTILITY IS IN  THE  PROCESS OF MODIFYING  THE  SCRUBBING SYSTEM
                            FfcOM * LIKESTINE INJECTION AND  TAIL-END SCRUBBING  BASED  SYSTEM TO A LIME
                            SLURRY BASED  SYSTEM.
  6/76
 11/76
        4A
        48
        SYSTEM
AFFECTED MODULES: SYSTEM

                   65.p
                    5.0
  7/76  SYSTEM
  8/76  SYSTEM

  9/76  SYSTEM
                                                                   720    460

                                                                   744

                                                                   744

                                                                   720
        ** PPOBLEMS/SOLUTIONS/COMMENTS
               START  DATE   9/76      EGUI »I*ENT: FGD SYSTEM,  GENERAL
               END  DATE    10/76      COMMfNTS:
                            THE  SYSTEM WAS OUT OF SERVICE  VIRTUALLY THE  ENTIRE  REPORT PERIOD DUE  TO  A
                            MAJOR  EXPLOSICN WHICH OCCURRED IN THE COAL MILL  PULVERIZING AREA OF UNIT  5
                            WHICH  SERIOUSLY HAMPERED OPERATIONS AND MANPOWER  COMMITMENTS.
               AFFECTED MODULES: SYSTEM
 10/76  SYSTEM
        4A
        4E>
        SYSTEW
                                  91.0
                                                                                  744
                                                                    720    7fi6
  1/77
        **  PROBLEMS/SOLUTIONS/COPWENTS
               START DATE  11/76      EQUIPMENT:  FGD  SYSTEM, GENERAL
               E«6 DATE    13/76      COMMtNTS:
                            TtiE  UTILITY- rS-IN THE PROCESS" Of CCNVER TING  THE  SYSTEH TO A NET LIME
                            SCRUBBING SYS1FM, WHICH  WILL COMMENCE OPERATIONS IN THE FIRST PART  OF
                            JANUARY.
               AFFECTED MODULES:  SYSTEM
 12/76   4A
         4B
         SYSTEM
         4A
         4E
         SYSTEM
                    85.0
                    74.0
                                                                    744
                                                                    744
                                                                          572
         **  PROBLEMS/SOLUTIONS/COMMENTS
               START DATE    1/77      EBUIFMENT:  FGD  SYSTEM, GENERAL
               END DATE      3/77      COMMCNTS:
                             THE  UNIT BECAKE AVAILABLE FOR SERVICE  IN  THE LIME SCRUBBING  MODE  ON JAN. 1
                             1577. TESTING FOR COMPLIANCE WITH PARTICULATE CODES OCCURRED DURING THE
                             MONTH. THE UNIT WAS  FOUND TO MEET THE  EMISSION REGULATION  OF 0.17 LB/MM BT
                             BIRNIN6 2.CX  5ULFUR  COAL. SYSTEM OPERATIONS  ARE STILL CONTINUING  AT OX
                             SCLjDS AND 10CZ BLOUDOWN. THE FRESH  WATER MAKE-UP RE8UIREMENT IS  7/0 6PMVM
               AFFECTED MODULES:  SYSTEM
  2/77   4A
         4B
         SYSTEM

  3/77   4A
                    80.0
                    50.0
                                  82.0
                                                                    672    591
                                                   113

-------
EPA UTILITY  F&D  SURVEY: DECEMBER 1<>7fr - JANUARY  1979
                                             SECTION  3
                     DESIGN AND PERFORKAIiCE  DATA  FOR OPERATIONAL FGD SYSTEMS
	PERFORMANCE  DATA	
PERIOD  MODULE  AVAILABILITY OPEPABIL1TY  PLIABILITY  UTILIZATION  * REMOVAL   PER   BOILER  FGD   <•**•
                                                                  S02  PART.  HOURS  HOURS  HOURS FACTOR

        4B                       97.0
        SYSTEM                                                                   74*    539

  */77   4»                       43.0
        *B                       43.0
        SYSTEM                                                                   720    720

        «*  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   4/77     EOUIH^ENT:  F6D  SYSTEM, GENERAL
              END DATE     5/77     COMMITS:
                           THE SYSTEM IS  NOW OPERATING  WELL AT ABOUT 15-25X  SLOWDOWN. THE PH CONTROL
                           SYSTEM OPERATIONS HAVE  BEEN  EXCELLENT. DURING MAY THE BOILER BORNEO 6AS  FO
                           41* HOURS  (NOT INCLUDED  IN THE OPERAB1LITY VALUES).  SOZ  REMOVAL EFFICIENCY
                           IS ESTIMATED  M  50-60*  FOR BOTH MODULES. ALTHOUGH ACTUAL TESTS HAVE NOT
                           BEEN RUN FOR  
-------
                                            EPA  UTILITY FGD SURVEY: DECEMBER 1978  -  JANUARY  1979
                                           SECTION  3
                   DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL F60 SYSTEMS
PERIOD

10/77
11/77
12/77
1/78
2/7$
	 PERFORMANCE DATA 	
MODULE AVAILABILITY OFERASILITY IEL1ABIL1TY UTILIZATION X REMOVAL PER BOILER
S02 PART. HOURS HOURS
4P
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
73. C
74.0
69.0
70.0
68.0

720
744
720
744
744
25.0 672
589
550
496
520
508
672
FSD CAP.
HOURS FACTOR

550
496
520
508
167
3/78

4/78
5/78

6/78
      **  PROBLEMS/SOLUTIONS/COMMENTS
            START DATE   2/78      fCUIFWENT:  BOJLCR-RELATEO
            END DATE     3/78      PROBLEM:  NOT DEFINED/SPECIFIED
                         TttE UNIT  kAS  UOWN  THREE  TIKES DURING FEBRUARY FOR  NON-SCRUBBER  RELATED
                         PROBLEMS  AND  CNCE  FOR A  FUEL SAFETY TRIP. IN MARCH  THERE  WERE THREE
                         ECONOMI7tfi  LEAK  OUTAGES  (APPRO*. 231 HOURS).
            AFFECTED MODULES:  SYSTEC

      **  PROBLEMS/SOLUTIONS/COMMENTS
            START DATE   2/78      EQUIPMENT:  SCRUBBER
            END DATE     3/78      F-ROBlfM:  NOT DEFINED/SPECIFIED
                         THE UNIT  HAS  tOWN  ONCE IN FEBRUARY AND A6AIN FOR 32  HOURS  IN  MARCH FOR
                         GENERAL MAINTENANCE.
            AFFECTED MODULES:  SYSTEM
7/78

8/78
SYSTEM

SYSTEM
56.0

76.0
744

720
744

720
406

220
      ** PROBLEMS/SOLtiTIONS/COMMENTS
            START  DATE    4/78      E6UIFPENT: THICKENER
            END DATE      5/7S      PROBLEM: CHEMICAL-RELATED PLUGGING
                          F€D  OUTAGE  IN MAY WAS DUE TO CLAPIFIER  PLUGGING.
            AFFECTED MODULES:  SYSTEM

      ** FRObLEMS/SOLUTIONS/COMMENTS
            START-BATE    4/7«      tOUI IMENT: F6D SYSTEM. GENERAL
            END DATE      5/76      COMMENT: PREVENTIVE MAINTENANCE  SCHEDULED  UNIT  OUTAGE
                          APRIL OUTAGE TIME WAS FOR SCHEDULED  GENERAL  MAINTENANCE  AND CLEANING.
            AFFECTED MODULES:  SYSTEM
SYSTEM

SYSTEM
                                                        42. C
                       744

                       720
                                                                                    7(4
                                                                                           403
      ** PfiObLEMS/SOLUTIOKS/COMMENTS
             START  DATE    6/78     tOUIFttENT: FGD SYSTEM*  GENERAL
             END  DATE      7/78     COMMENTS:
                          NO INFORMATION WAS AVAILABLE  FOR THE  JUNE-JULY PERIOD BECAUSE OF A PLANT
                          STRIKE.
             AFFECTED  MODULES: SYSTEM
SYSTEM

SYSTEM
                       744

                       744
      ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE    8/78     £CUI FKENT:  F6D  SYSTEM.  GENERAL
             END  DATE      9/78     COMMENTS:
                          THE SCRUBBING SYSTEM  IS  OPERATING ALTHOUGH THE UTILITY IS STILL IN THE
                          MIDST OF A STUKE. FGD PERFORMANCE FIGURES ARE NOT AVAILABLE BECAUSE THE
                          UTILITY IS N01 RECORDING FGD  OPERATION HOURS DURING THE STRIKE.
             AFFECTED  MODULES: SYSTEM
9/78   SYSTEM
                                                                              720
                                                115

-------
    UTILITY  F6D  SURVEY: OECIMBFR 197E  - JANUARY 1979

                                             SECTION 3
                     DESIGN AND PERFOPKAKCE  DATA FOR OPERATIONAL FGD SYSTEMS
	PERFORMANCE  DATA	- — ——	..-...»-- —— ....
PERIOD MODULE  AVAILABILITY OPE RAP, I LIT Y  PLIABILITY  UTILIZATION  * REMOVAL    PER   BOILER  f60    CAP.
                                                                  S02  PART.  HOURS HOURS  HOURS FACTOR


10/78  SYSTEM                                                                   7*4

       •*  PR06LEMS/SOLUTIONS/COMKENTS
              START  DATE  10/78     SOU I (^ENT:  FGD  SYSTEM, GENERAL
              END DATE    11/78     COMMENTS:
                           ALTHOUGH THl  STRIKE  IS  OVER  NO OPERATIONAL DATA  IS  AVAILABLE.  THE FGD
                           SYSTEM IS IN  OPERATION.
              AFFECTED MODULES: SYS*

11/78  SYSTEM                                                                   7?0

12/7?  SYSTEM                                                                   7*4

       »*  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE  12/78     ESUIfWENT:  F6D  SYSTEM, GENERAL
              END DATE     1/79     COMMENTS:
                           HCURS OF OPEPPTjON ARE  STILL NOT AVAILABLE*  THE  FGD SYSTEM IS IN OPERATIC
                           BIT AT PRESEN1  FERSONEL  ARE  BEING REASSIGNED PREVENTING  ACCURATE  DATA
                           RtCORDING.
              AFFECTED MODULES: SYSTLM

 1/79  SYSTEM                                                                   74*
                                                116

-------
                         EPA  UTILITY FGO SURVEY: DECEMBER 1978 - JANUARY 1979
                        SECTION  3
DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL F6D SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE  EMISSION  LIMITATION - NG/J
S02 EMISSION LIMITATION - (,6/J
NET PLANT GENERATING  CAPACITY - nw
GROSS UNIT GENERATING CAPACITY - Ml.
NET UNIT GENERATING  CAPACITY U/FGD - M I.
NET UNIT GENERATING  CAPACITY Wfi/FGD - "V
EQUIVALENT SCRUBBED  CAPACITY - nU

** BOILER DATA
    SUPPLIER
    TYPE
    SERVICE  LOAD
    COMMERCIAL  SERVICE DATE
    MAXIMUM  BOILER FLUE GAS FLOW - CU.F/S
    FLUE 6AS  TEMPERATURE - C
    STACK HEIGHT  - M
    STACK TOP  DIAMETER - I"

**  FUEL DATA
     FUEL TYPE
     FUEL GRADE
    AVERAGE  HEAT  CONTENT - KJ/KG
     RANGE HEAT  CONTENT - BTU/LB
    AVERAGE  ASH CONTENT -  *
     RANGE  ASH CONTENT - X
     AVERAGE  MOISTURE CONTEUT  - X
     RANGE  MOISTURE CONTENT -  X
     AVERAGE  SULFUR CONTENT -  X
     RANGE  SULFUR  CONTENT - X
     AVERAGE  CHLORIDE CONTENT  - X
     RANGE  CHLORIDE CONTENT -  X
     FUEL  FIRING RATE - M T/H
     FUEL  FIRING RATE - MU

 ** PARTICULATE SCRUBBER
     NUMBER
     TYPE
     SUPPLIER
     NUMBER  OF STAGES
     SHELL  MATERIAL
     LINING  PATCH *L
     NUMBER  OF NOZZLES
     TYPE OF NOZZLES
     BOILER  LOAD/SCRUBBER -  X
     FLUE GAS CAPACITY  -  CU.M/S
     fLUE GAS TEMPERATURE -  C
     LIQUID  RECIRCULATION RATE -  LITER/S
     L/6 RATIO - LITER/CU.M
     PRESSURE DROP -  KPA
     SUPERFICIAL GAS  VELOCITY  - W/S
     PARTICULATE DESIGN  REMOVAL EFFICIENCY
     S02 INLET CONCENTRATION  - PPM

 ** F6D SYSTEM
     SALEABLE PRODUCT/THROWAWAY PRODUCT
     GENERAL PROCESS  TYPE
     PROCESS TYPE
     SYSTEM SUPPLIER
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     PARTICULATE DESIGN  REMOVAL EFFICIENCY
     S02 DESIGN REMOVAL  EFFICIENCY  - X
     COMMERCIAL DATE
     INITIAL START-UP
     CONSTRUCTION  INITIATION

 ** ABSORBER
     NUMBER
     TYPE
     INITIAL START UP
                             KANSAS  CITY POWER £ LIGHT
                             LA  CYGNE
                             1
                             LA  CVSNE
                             KANSAS
                        - X
                         . X
                                               .128 LP/MMBTU)
                                              1.500 LB/KMBTUi
   55.          C
  645.          (
 USO.O
  B74.0
  820.0
  844.0
  874.0
                             BABCOCK AND W1LCOX
                             PULV COAL, SUPERCRITICAL, CYCLONE FIRED
                             BASE
                              0/73
                              1502.44       £2760000 ACFM)
                               140.6        < 2R5 F>
                               213.         < 700 FT)
                             *******        <***** FT)
                             COAL
                             SUBBITUMINOtlS
                              21913.

                                24.36
                             24-25
                                 8.60
                             9-10
                                 5.39
                             5-6
                                  .03
                             0.02-0.03
                               366.4
                               820
                       BTU/LB)
                9000-9700
               (404 TPH)
 8
VARIABLE THROAT VENTURI
BABCOCK AND UILCOX
    1
316L SS
KAOCRETE CERAMIC
   80
SPINNER VANE, COORS CERAMIC
   12.5
  162.8
   57.2
  315.0
    1.6
    1.7
   39.6
   9S.2
 4500.000
                                               345000 ACFM)
                                                135  F)
                                               5000  GPM)
                                             12.0 GAL/10CQACF)
                                                 7  IN-H20)
                                                130.0 FT/S)
TKROWAUAV  PRODUCT
WET SCRUBBING
LIMESTONE
BABCOCK g  UILCOX
FULL-SCALE
NEW
   99.50
   80.00
 6/73
 2/73
 4/69
                                    TRAY TOWER
                               2/73
                             117

-------
  UTILITY  FbO  SURVEY:  DECEMEiER 197f - JANUARY 1979

                                          SECTION  3
                   DESIGN AND PERFORMANCE CATA FOR OPERATIONAL  F60 SYSTEMS
    SUPPLIER
    NUMPER  OF  STAKES
    DIMENSIONS
    SHELL  MATERIAL
    SHELL  LINER MATERIAL
    INTERNAL  MATERIAL
    NUMBER  OF  N027LES
    NOZILF  TYPE
    60ILER  LOAD/ABSORBER - 7.
    6AS FLOW  - CU.M/S
    GAS TEMPERATURE - C
    LIOUID  RtClRCULATlON RATE - LITfR/l
    L/6 RATIO  - L/CU.M
    PRESSURE  DROP - KPA
    SUPERFIfAL CAS VELOCITY - M/SEC
    S02 OUTLET CONTRATION - PPM

   FANS
    NUMBER
    TYPF
    CONSTRUCTION MATERIALS
BABCOCK 8 WILCOX
    ?
32 X 16 * 25
31AL SS
NONE
316L SS SIEVE TRAY
   16
SPINNER-WAKE. CERAMIC
   1J.5
  112.55
   50.0
  567-
    3.5
    1.5
    4.6
 1000
( 238500 ACFM>
{  122  F>
( 9000  GPW)
( 26.5  6AI/1000ACF)
( 6.0 IN-HZO)
< 15.0  FT/S)
F6D I.D.
SS CLIP ON  EACH  BLADE
•• FANS
    NUMBER
    TYPE

** MIST ELIMINATOR
    MUMPER
    TYPE
    CONSTRUCTION MATERIAL
BOILER  I.D.
SIEVE TRAY
SS
** MIST ELIMINATOR
    TYPE
    CONSTRUCTION MATERIAL
    FREEBOARD DISTANCE - «
    DEPTH - M
    VANE SPACIN6 - CM
    VANE ANCLES
    WASH SYSTEM
    SUPERFICIAL GAS VELOCITY  -  M/S
    PRESSURE DROP - KPA
CHEVRON  (2  CHEVRONS  IN 3 MODULES)
FRP
     3.66       (12.0 fT>
      .24       (  .8 FT)
     7.6         < 3.00 IN)
45 DEG.
CONT.  230  CPM  OVERSPRAY
     2.6         C  6.4 FT/S)
      .3         < 1.4 IN-H2o>
** MIST ELIMINATOR
    NUMfER
    TYPE
    CONSTRUCTION MATERIAL
    FREEBOARD  DISTANCE  - M
    DEPTH - M
    VANE SPACING -  CM
    VANE ANGLES
    WASH SYSTEM
    SUPERFICIAL &AS VELOCITY  - M/S
    PRESSURE DROP - KPA

•* PROCESS CONTROL  CHEMISTRY
    CONTROL VARIABLES
    CONTROL RANGE
    CONTROL MANNER
    SENSOR LOCATION

** PUMPS
    SERVICE
    POND UATER RETURN
    LIMESTONE SLURRY MAKEUP
    TRAT TOWER ABSORBER
    VENTURI
 CHEVRON
 FRP '
    7.66       (12.0 FT)
      .24       <  .8 FT)
    7.6         ( 3.00 IN)
 45  DEC.
 CONT.  230 GFM OVERSPRAV
    2.6         (  fl.4 FT/S)
      .3         ( 1.4 1N-H20)
 PH,  SOLIDS X
 PH(5.6-5.S)
 AUTOMATIC
 PH  AT  VENTURI, SOLIDS AT VENTURI  RECIRC. LINE
                                                NUMBER
** TANKS
    SERVICE
    LIMESTONE SLURRY MA|(EUF
    RECYCLE TANK
 NUMBER

    2
    8
                                               118

-------
                                              EPA  UTILITY FGD SURVEY: DECEMBER  1978  -  JANUARY 1979
                                            SfcCTION  3
                    DESIGN AND PERFORMAKE  DATA  FOR OPERATIONAL F6D SYSTEMS
** REHEATER
     NUMBER
     TYPE
     HEATING  MEDIUM
     TEMPERATURE BOOST - C

** REHEATER
     NUMBER
     TYPE
     TEMPERATURE BOOST - C

** WATER  LOOP
     TYPE
     FRESH MAKEUP WATER ADDITION  -  LITEivS/S

** REA6ENT  PREPARATION EQUIPMENT
     NUMBER  OF BALL MILLS
     REA6ENT  PRODUCT - X SLURRY SOLIDS

** DISPOSAL
     NATURE
     TYPE
     LOCATION
     TRANSPORTATION
     AREA  - ACRES
     CAPACITY - CU.M
                              1
                             IN-LINE
                             STFAM
                                33.3
                                             (    60  F)
                             INDIRECT HOT AIR
                                33.3         <    60  F)
                             OPEN
                                72.3         (  1148  GPM)
                                 Z
                               66.0
                             FINAL
                             UNLINtD POND
                             ON-SITE
                             RUPEER LINED  PIPE
                               160.0
                                2152*80      (   1760.0  ACRE-FT)
PERIOD MODULE AVAILABILITY  GPERABIL1TY
                    	PERFORMANCE  DATA	
                    (•{LIABILITY UTILISATION
                                                                 x REMOVAL    PER   BOILER   FED   CAP.
                                                                 SOZ   PART.  HOURS  HOURS   HOURS  FACTOR
12/72  SYSTEM
                                                                               744
          PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   12/72      EGUI?«ENT: F60 SYSTEM, GENERAL
              END  BATE
                          12/72     COMMENTS:
                          THE FIRST TRIAL OPERATION BEGAN ON DECEMBER  26,  197?  AND  WAS  PLAGUED WITH
                           NUMEROUS PROBLEMS.  SOME OF THESE PROBLEMS,  SUCH  AS  VIBRATIONS OF THE
                           IfcDUCED-DRAFT FANS AND THEIR SENSITIVITY  TO  INBALANCE, OCCURRED EVEN BE-
                           FORE THE BOILtiR AS FIRED. AS THESE FABRICATION  PROBLEMS  MERE CORRECTED
                           AfcD THE F£C StSTEM WENT INTO OPERATION  TWO  OTHER  TYPES OF  PROBLEMS AP-
                           PEARED THE FIRST TYPE ASSOCIATED  KITH THE WET LIMESTONE  PROCESS.INCLUDED
                           PLUGGING OF T ft DEMI STER AND STRAINED S.   THE CORROSION AS SO CT ATE D HITH
                           CONDENSATION CF ACID VAPORS FROM  THE  CAS  ONITHF  REHEATER TUBE BUNDLES
                           WAS CONTROILEC BY INJECTION OF SLIP STREAMS  OF  HOT  AIR FROM  THE BOILER'S
                          COMBUSTION AIR HEATER INTO THE SCRUBBED  FLUE  6ASES AT THE INLET TO THE
                          REPEATER UNITS.  THIS PRACTICE WHICH REDUCED  THE  MAXIMUM  GENERATING
                          CAPACITY OF THE BOILER BY LIMITING THE AIR AVAILABLE  FOR  COAL COMBUSTION,
                          IS NO LONGER N1CESSARV BECAUSE OF  SYSTEM  DESIGN  MODIFICATIONS.
              AFFECTED  MODULES: SYSTEM
 0/74   SYSTEM
        ** PRQBLEMS/SOLUTIONS/COMKENTS
              START  DATE    0/74     [GUIFMENT:  '
              END  DATE      0/0     COMM[NTS:
                           THE 1974 FIGURES ARE BASED UPON  ACTUAL  SYSTEM OPERATION HOURS AS A
                           FUNCTION CF ACTUAL BOILER HOURS
              AFFECTED  MODULES: SYSTEM
  1/74
        A
        B
        C
        D
        E
        F
        e
        SYSTEM
 2/74
49.0
S2.0
44.0
87.0
23.0
37.0
81.0
50.0

66.0
74*
                                                 119

-------
EPA UTILITY  fGD SURVEY:  DECEKBFR 197f - JANUARY 1979
                                              SECTION 3
                     DESIGN AND PERFORMANCE  DATA FOR OPERATIONAL  FGD SYSTEMS

PERIOD







3/74
4/74







5/74







6/74







7/74







8/74







9/74







10/74


MODULE
B
C
0
E
f
6
SYSTEM
SYSTEM
A
B
C
0
t
f
e
SYSTEM
A
6
C
0
E
F
E
SYSTEM
A
B
C
D
f
f
6
SYSTEM
A
B
C
D
£
F
G
SYSTEM
A
B
C
0
E
f
6
SYSTEM
A
B
C
D
e.
f
c
S'STEM
A
e

	 PERFORMANCE DATA 	
AVAILABILITY CPEMBILITY ^LIABILITY UTILIZATION
68.0
59.0
76.0
52.0
100.0
65.0
69.0

67.0
70.0
75.0
88.0
74.0
100.0
8*.0
80.0
69.0
83.0
78.0
85.0
7S.O
84.0
80.0
80.0
«z.o
84.0
83.0
90.0
8?.0
83.0
87.0
86.0
75.0
80.0
86.0
81 .0
85.0
79.0
77.0
80.0
90.0
90.0
73.0
81.0
81.0
7?.0
99.0
85.0
69.0
88.0
73.0
76.0
83.0
89.0
86.0
81.0
90.0
71.0

* REMOVAL PER BOJLER FGD CAP.
SOJ PART. HOURS HOURS HOURS FACTOR






672
744







720







744







720







744







744







720


                                                   120

-------
                                              EPA  UTILITY F6D SURVEY: DECEMBER 1978 - JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PERFOftMAhC E  DATA FOR OPERATIONAL FGD SYSTEMS
—	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY  CPERABUITY  PLIABILITY UTILIZATION
                                                         Z REMOVAL   PER  BOILER
                                                         SCZ  PART. HOURS HOURS
                                                                                          FGD
                                                                                         HOURS
                  CAP.
                 FACTOR
       C            60.0
       D            61.0
       E            84.0
       F            85.0
       6            {14.0
       SYSTEM       76.0

11/7*  A            90.0
       B            71.0
       C            60.0
       D            61.0
       E            84.0
       f            85.0
       6            84.0
       SYSTEM       76.0

12/74  SYSTEM

  0/75  SYSTEM
                                                                      744
                                                                      720

                                                                      744
        **  PAOBLEMS/SOLUTIONS/COPmENTS
              START DATE   0/75     ESUItnENT: F6D SYSTEM, GENERAL
              END DATE     0/75     COMMENTS:
                           T*E 1975 FIIUH.S ARE BASED UPON SYSTEM AVAILABL HOURS AS A FUNCTION OF
                           HOURS IN THE PERIOD.
              AFFECTED MODULES: SYSTEM
  1/rs

  2/75

  3/75
SYSTEM

SYSTEM
744

67Z
        SYSTEM
            82.0
            96.0
            90.0
            76.0
            93.0
            92.0
            96.0
            90.0
                                                                              744   694
        ** MOeLEMS/SQLUTlONS/COMMNTS
              START DATE   3/75     ESUIFHENTs  F6D SYSTfH, GENERAL
              END OATi     3/75     COMMINTSJ
                           DURING RSHJCEC LOAD  CONDITIONS SCHf OF THi K80UUES WERE NOT RfegjRfO AND
                           T^UffORI SHU1 DOWN  ALTHOUGH THiV HiRi AVAILABLE.  AVAILABILITY HAS THIKE-
                           FOR HIiHIR THIN  SQMi OF THI POSTED FIGURES INDICATE.
              AFFECTED MODULES!  SYSTEM
  4/7S  SYSTEM

  5/75
                                                                              720
  6/75
         YSTEB
            95.0
            B5.0
            94. 0
            90.0
            90.0
            89.0
            63.0
            89.0

            8B.O
            85.0
            64.0
            as.o
            84.0
            86.0
            89.0
            86.0
                                                                               744    6*3
                                                                               720   667
                                                 121

-------
EPA UTILITY  f60  SUPVEV: DECEMBER 197f  -  JANUARY 1979
                                             SECTION 3
                     DESIGN AND  PE R F OPKA 1st E  DATA FOR OPERATIONAL  F66  SYSTFWS
	PERFORMANCE DATA	~
PEPIOD  HOODIE  AVAILABILITY CPEPARIHTY  ffLIAnillTY UTILIZATION   X  REMOVAL   PER  BOILER   F6D   CAP.
                                                                   S02   PART. HOURS HOURS   HOURS FACTOR
7/75







A
B
C
D
E
F
6
SYSTEM
78.0
90.0
90.0
E4.0
85.0
67.0
85.0








7*4 590
  8/75
  9/75
 10/75
11/75
        A
        B
        C
        D
        E
        F
        6
        SYSTEM
            75.0
            8S.O
            87.0
            78.0
            92.0
            65.0
            87.0
            84.0
** PR08LEWS/SOLUTIONS/COMMENTS
      START DATE    8/75      EAUlrMENT: F6D SYSTEMt  GENERAL
      END DATE      K/75      COKMtNTSl
                    ("OODLES  A AND D ARE USED FOR RESEARCH  TESTS.
                    EVENING  FOR CLEANING.
      AFFECTED MODULES:  A       D

A           78.0
B           81.0
C           84.0
D           65.0
E           79.0
F           7P.O
G           74.0
SYSTEM      *0.0

A           66.0
B           77.0
C           46.0
D           74.0
E           72-rO
F           73.0
6           65.0
SYSTEM      6B.O
744   630
                                                                           ONE MODULE IS SHUT  DOVIN EAC.
                                                                                720   610
                                                                                744
                                                                                       231
        ** PKOBLEm/SOLUTIONS/COHKENTS
              START KATE   10/75      ECUIPWENT: F6D SYSTEM,  GENERAL
              END DATF     11/75      PROBLEM: NOT 6EFINED/SPECIFI ED
                            T*E  EYST£* UA£ DOWN OCTOBER 16 JO  NOVEMBER 13 OWING TO PROBLEMS  WITS
                            TXE  GENERATOR AND I.D. AIR FAN.
              AFFECTED MODULES:  SYSTEf

        «* PROBLEMS/SOLUTIONS/COIKMENTS
              START DATE   10/75      ESUI^'ENT: F6D SYSTEM,  GENERAL
              END DATE     11/75      COhtftNTS:
                            AVAILABILITY fRCURES FOR OCTOBER AND  NOVEMBER DO NOT  INCLUDE THE OUTAGE
                            TIME  FROM OCTOBER 16 TO NOVEMBER 13.
              AFFECTED MODULES:  SYSTEM
        SYSTEM
            93.0
            90.0
            80.0
            93.0
            96.0
            89.0
            94.0
            91.0
                                                                                 7?0    346
                                                 122

-------
                                              EPA UTILITY f6D SURVEY:  DECEMBER  1976  - JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PERFOKKAKCE DATA FOR OPERATIONAL F6D SYSTEMS
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPERABILITY tELIABUITY UTILIZATION   X  REMOVAL    PER   BOILER   F6D   CAP.
                                                                  SC2   PART.  HOURS  HOURS  HOURS FACTOR
12/75
       A
       B
       C
       0
       E
       F
       6
       SYSTEM
91.0
87.0
81.0
85.0
87.0
89.0
64.0
£6.0
                                                                               7*4    597
        **  P80BLEMS/SOLUTIONS/COKWENTS
              START  DATE  12>75     EOUItWENT: BOILER-RELATED
              END DATE    12/75     F-RCFUFM; NOT DEFINED/SPECIFIED
                           THREE BOILEK  OUTAGES OCCURRED  DURING  DECEMBER.
              AFFECTED MODULES- SYSTEM
1/76







2/76







3/76







A
B
C
D
E
F
e
SYSTEM
A
B
C
0
E
F
6
SYSTEM
A
B
C
0
E
f
6
SYSTEM
86.0
85.0
91.0
72.0
84.0
52,0
64.0
87.0
94.0
90.0
86.0
91.0
92.0
93.0
95.0
92.0
92.0
90.0
£8.0
93.0
94.0
91.0
91.0
91.0
                                                                               744    618
                                                                               696   594
  4/76  SYSTEM
                                                                               744

                                                                               720
                                                                                     643
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   4/76      EMINENT:  BOILER-RELATED
              END DATE     5/76      COMMENT: PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                           THE  SYSTEM WAS SHUT  DOWN ON APRIL 6 FOR A SCHEDULED BOILER, AIR PREHEATER,
                           AltD  STACK BREECHING  OVERHAUL.  THE UNIT WAS RESTARTED ON HAY 10.
              AFftCTED MODULES:  SYSTEM

        *» PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   4/76      SSUlFMENTt  DUCTWORK
              £ND DATE     5/76      PROBLFB: CHEMICAL-RELATED CORROSION
                           DIRIN6  THE OU1A6E SOnE MAINTENANCE WAS PREFORHFD ON THE SCRUBBER BUCTHORK,
                           PRIMARILY BECAUSE OF CORROSION PROBLEMS.
              AFFECTED MODULES:  SYSTEM
  5/76  A
        B
        C
        D
        E
        F
        6
        SYSTEM
 96.0
 92.0
 93.0
 96.0
 89.0
 95.0
 96.0
 94.0
744   436

-------
EPA UTILITY FGD SURVEY: DECEMBER  197?  -  JANUARY  1979
                                            SECTION  3
                    DES16N  AND  PERFORMAKCE  DATA  FOR OPERATIONAL  FED  SYSTFMS
			PERFORMANCE  DATA			I'TII"  i-.B
PERIOD  MODULE  AVAILABILITY  CPERABIL1TY  RELIABILITY  UTILIZATION   X  REMOVAL    PER  BOILER  F6D   "P.
                                                                 SO?   PART. HOURS HOURS  HOURS FACTOR


        **  PROBLEKS/SOLUTIONS/COMMENTS
              START  DATE    5/76      IBUIfENTs  F6D  SYSTEM,  GENERAL
              END  DATE      5/76      PROBLEM:  NOT  DEFINED/SPECIFIED
                           FROM  KAY  10  TC  TH£ END 0'  THE  MONTH  FOUR UNIT  OUTAGES WERE ENCOUMTERFD.
              AFFECTED  MODULES:  SYSTEM

  6/76   A            93.0
        6            94.0
        C            94.0
        D            95.0
        E            93.0
        f            93.0
        e            9i.o
        SYSTEM      93.0                                                       720

        •*  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    A/76      IOUI FMENTt  FGD  SYSTFMt  GENERAL
              END  DATE      6/76      FCCBKM:  NOT  DEFINED/SPECIFIED
                           FOUR  FORCED  MINOR  SCRUBBER OUTAGES OCCURRED DURIN6 JUNE.
              AFFECTED  MODULES:  SYSTEM

  7/76               96.0
                    95.0
                    92.0
                    93.0
                    93.0
                    95.0
                    94.0
        SYSTEM      94.0                                                       744

        «*  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    7/76      £CUI THENT:  F6D  SYSTEM*  GENERAL
              END  DATE      7/76     PPCBlfM:  NOT  DEFINED/SPECIFIED
                           TkO MINOR SCRLPBER OUTAGES OCCURRSD DURING  JULY.
              AFFECTED  MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    7/76     EQUIPMENT:  FGD  SYSTEM,  GENERAL
              END  DATE      7/76     tCMMINTS:
                           THE UNIT  RF CO ft) ED  ITS  LARGEST MU-HOUR MONTH SINCE INITIATION OF COMMERCIAL
                           OPERATION
              AFFECTED  MODULES: SYSTEM

  8/76   A            94.0
        B            93.0
        C            92.0
        D            94.0
        E            92.0
        F            90.0
        G            88.0
        S»STEM      92.0                                                       744

        **  PROBLENS/SOLUTIONS/COMMENTS
              START  DATE    8/76     EQUIPMENT: BOILER-RELATED
              END  DATF     10/76     PROBLEM:  NOT DEFINED/SPECIFIED
                           ThE UNIT  MAS TAKEN OUT OF SERVICE AUGUST H FOR  REPAIR  OF  A  TURBINE PLADE.
                           THE UNIT  bAS RETURNED TO SERVICE  ON OCTOBER 70.   OPERATION WAS  INTERMIT-
                           TENT PENDING TURBINE BLADE REBALANCING  AND REESTABL1SHMENT OF NORMAL
                           OPERATING CONDITIONS.
              AFFECTED  MODULES: SYSTEM

        *«  PROBLEMS/SOLUTIONS/COMMENTS
              START  BATE    8/76     E6U!F«ENT: STACK
              END  DATE     10/76     PROBLCn: NOT OEF1NED/SPECIFIEO
                           DURING THE TUfPINE REPAIR PERIOD  THE  UTILITY  CpATED  THE  STACK  INNER
                           STRUCTURE WITH PLASTITE 400S.
                                                124

-------
                                             EPA UTILITY  FGD SURVEY:  DECEMBER  1978  -  JANUARY  1479
                                            SECTION 3
                    DESIGN AND PERFORMANCE  DATA FOR OPERATIONAL  FGD SYSTEMS
--—-—•— — -----——------•—	-PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY  OPERA6IL1TV  PLIABILITY UTILIZATION
                                                                 X  REMOVAL   PER  BOILER  FGD   CAP.
                                                                 SO?   PART.  HOURS HOURS  HOURS  FACTOR
             AFFECTED MODULES:  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE    1/76      ECUIFMENT:  F6D  SYSTEM,  GENERAL
             END DATE      8/76      COMMITS:
                           THE AUGUST AVAILABILITY  FIGURES  DO  NOT  INCLUDE  THE  OUTAGE  TIME.
             AFFECTED MODULES:  SYSTEM
 9/76   SYSTEM

10/76   SYSTEM

11/76
                                                                      720

                                                                      7*4
 12/76
         YSTIM
        IVSTIM
            95.0
            9J.O
            94.0
            95.0
            94.0
            91! .0
            94.0
            94.0

            87.0
            89.0
            81.0
            94.0
            94.0
            95.0
            91.0
            90.0
720   627
744   706
  1/77
**  PROBLENS/SOLUTIONS/COMMENTS
      START DATE  12/76     HUJIMENT: RECYCLE PUMP
      END DATE    12/76     FROBUM: NOT DEFINED/SPECIFIED
                   TfcE A-MODULE VENTURI RECYCLE PUMP EXPERIENCED SOME  PROBLEMS  AND  WAS
                   REPAIRED.
      AFFECTED MODULES* A

•*  PROBLEMS/SOLUTIONS/COMMENTS
      START DATE  12/76     EQUIPMENT: REAGENT HANDLING
      EN* "BATE    12/76     PFOB'lEM: NOT DEFINED/SPECIFIED
                   THE C-MODULE'! REHEAT STEAM TUBE BUNDLES WERE INCREASED  IN NUMBER  FROM
                   FCUR TO EIGHT.
      AFFECTED MODULES: C

            94.0
            90.0
            95.0
            95.0
            95.0
            92.0
            90.0
            93.0
         YSTEM
  2/77
  3/77
                                                                              744   714
            93.0
            93.0
            93.0
            94.0
            93.0
            94.0
            88.0
            93.0

            94.0
            92.0
            86.0
            94.0
                                                                              672   634
                                                12S

-------
EPA UTILITY  F6D  SURVEY: DECEMBER  197F  -  JANUARY 1979
                                             SECTION 3
                     DESIPN AND  PFRFORMAKf E  DATA FOR OPERATIONAL  FCC  SYSTEMS
	PERFORMANCE DATA	
PERIOD  MODULE  AVAILABILITY  CPERABIL1TY  PLIABILITY UTILIZATION   t  REMOVAL   PER  BOILER   FGO   CAP.
                                                                   S02   PART. HOURS HOURS   HOURS FACTOR
E
F
S
SYSTEM
91 .0
94.0
90.0
92.0



744
        *•  PROBLEMS/SOLUTIONS/COMMENTS
              START BATE   7177      ECUIfMENT: F6D SYSTEM, GENERAL
              END DATE     ?/77      COWM1NTS:
                           THE  EIGTH MOBILE HAS BEEN INSTALLED.
              AFFECTED MODULES:  H

        **  PR08LEMS/SOLUTIONS/COMKENTS
              START DATE   3/77      E»UJH"ENT: MIST ELIMINATOR
              END DATE     3/77      PROBLEM: NOT DEFINED/SPECIFIED
                           THE  MIST  ELIMINATORS IN TWO MODULES  HAVE  BEEN MODIFIED TO THE  POINT VHERE
                           THEY  HAVE PIF*- OPERATING CONTINUOUSLY  CLEAN.
              AFFECTED MODULES;  SYSTEM

        **  PR06LEMS/SOLUTIONS/CCMMENTS
              START DAjE   3/77      EGUIFWENT: REHEATER
              END DATE     3/77      FROPlEM: NOT D E FIN ED /S PE CI f I ED
                           ADDITIONAL BA MC S OF STEAM TUBE BUNDLES HAVE  BEEN INSTALLED  IN  SOME  MODULES
                           50  f  CF  REHEAT MAS BEEN DETERMINED  AS  THE  NECESSARY AMOUNT FOR  THE
                           LA  CYN6E  Kt>. 1 UNIT.
              AFFECTED MODULES:  SYSTEM

        »*  PRObLEMS/SOLUTIONS/COMMENTS
              START DATE   3/77      IBUlfENT: PROCESS CONTROL
              END DATE     7/77      COKMtNTS:
                           THE  WATER Loof is NOW 95* CLOSED-
              AFFECTED MODULES:  SYSTEM

        **  PR08LEMS/SOLUTIONS/COWMENTS
              START DATE   3/77      ECUMCENT: SLUDGE DISPOSAL
              END DATE     3/77      IOMM tNTS:
                           A  NEW SETTLINC POND IS BFIN6 INSTALLED AT THE PL*NJ.
              AFFECTED MODULES:  SYSTEM

        •*  PROBLEMS/SOLUTIONS/COMMENTS
              STVIRT DATE   3/77      EOtll FMBWT: BOILER-RELATED
              END DATE     3/77      CCMM [NTS:
                           THE  PLANT IS iTILL 6ENERATIN6  7QO-7ZO  »V  DURIN6 THE DAY AND  500-570 MM
                           AT  NIGHT-
              AFFECTED MODULES:  SYSTEM

  4/77  A           96.0
        B           94.0
        C           97.0
        fi           94.0
        E           95.0
        f           99.0
        6           95.0
        SYSTEM      95.0                                                        7ZO

        ••  PROBIEMS/SOLUIIONS/COMMENTS
              START DATE   4/77      E6UITMENT: ABSORBER
              END DATE     4/77      COMMENTS:
                           THE  EI6HT fcODUE HAS BEEN RUN  FOR  TWO DAYS.
              AFFECTED MODULES;  H

  5/77  SYSTEM                                                                  744

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START BATE   5/77      EOUIH-IENT: B01LER-R£LATE 0
              END DATE     7/77      PROBLEM: NOT  DEFINED/SPECIFIED
                           TfcE  UNIT  WAS 5HUT DOWN  IN MAY  DUE  TO TURBINE PROBLEMS.   THE UNIT RESTARTED
                           JULY  5, 1977.
                                                  126

-------
                                              EPA UTILITY FGO SURVEY: DECEMBER 1978 - JANUARY  1979
                                            SECTION 3
                    DESIGN  AND  PERFORMAt.CE  DATA FOR OPERATIONAL FED SYSTEMS
...	.	.	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY  OPERABIL1TY  PLIABILITY UTILIZATION  * REMOVAL   PER  BOILER  FGD   CAP.
                                                                 SO?  PART. HOURS HOURS  HOURS  FACTOR

             AFFECTED  MODULES:  SYSTEM

       •* PROBLEMS/SOLUTIONS/COKMENTS
             START  DATE    5/77      EQUIPMENT: MIST ELIMINATOR
             END  DATE      5/77      PROBLEM? NOT DEFINED/SPECIFIED
                           THE MIST ELIM0TOR WASHING CONFIGURATION IS BEING CHANGED  TO WORK
                           CCUNTERCURRKN1 TO THE 6AS FLOW.
             AFFECTED  MODULES:  SYSTEM

       ** PR06LEMS/SOLUTIONS/COMMENTS
             START  DATE    5/77      tQUIf-MINT: REHEATER
             END  DATE      5/77      PROBLEM: NOT DEFINED/SPEClf1 ED
                           ADDITIONAL TUf.E. BUNDLES ARE BEING ADDED TO INCREASE THE REHEAT AREA.
             AFFECTED  MODULES:  SYSTEM

       ** PROBLEMS/SOLUTIONS/CCMMENTS
             START  DATE    5/77      EQUIPMENT: SLUDGE DISPOSAL
             END  DATE      5/77      COMM tNTSJ
                           THE NEW SETTLING POND IS STILL BEING DRAWN UP.  EXCAVATION HAS NOT BEGUN.
             AFFECTED  MODULES:  SYSTEM

  6/77  SYSTEM                                                                  720

       •* PROBLEMS/SOLUTIONS/COMMENT!;
             START  DATE    6/77      EQUIPMENT: F6D SYSTEM, GENERAL
             END  DATE      6/77     COMM I:NTS:
                           MINOR CLEAMON1 AND REPAIR WORK WAS DONE ON THE SCRUBBING  SYSTEM DURING
                           THE TURBINE OITA6E.
             AFFECTED  MODULES:  SYSTEM

  7/77  A           95.0
       B           93.0
       C           94.0
       D           95.0
       E           95.0
       F           95.0
       6           95.0
       H           95.0
       SYSTEM       95.0                                                        744    52B

       **  PROBLEMS/SOLUTIONS/CCMMENTS
              START  DATE    7/77     EQUIPMENT: FGD SYSTEM, GENERAL
              END  DATE      7/77     COMMENTS:
                           RESUMPTION OF OPERATIONS WAS  CONDUCTED WITH  EIGHT SCRUBBER MODULES  IN  THE
                           FLUE GAS PATH, ENABLING THE UNIT TO OPERATE  AT A MAXIMUM  CONTINUOUS  LOAD
                           CAPACITY CF 8CO-820 MW.
              AFFECTED  MODULES:  SYSTEM

  8/77  A           89.0
       B           55.0
                    93.0
                    93.0
                    90.0
                    93.0
                    93.0
       H           94.0
       SYSTEM       87.0                                                        744    507

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    8/77     EQUIPMENT: FGD SYSTEM* GENERAL
              END  DATE      8/77     COMMENTS:
                           PARTICULATE REMOVAL TESTS  VERE CONDUCTED  IN  LATE AUGUST  AND UNIT  N0.1  MAS
                           PASSED THE COMPLIANCE  REQUIREMENTS  (0.13  LC?/MN BTU).
              AFFECTED  WOoULlS:  SYSTEM

       **  PR06LEMS/SOLUTIONS/COMMENTS
              START  DATE    8/77     EQUIfMENT: RECYCLE PUMP
              END  DATE      f/77     PROBLEMS COMPONENT FAILURE*  OTHER



                                                 127

-------
EPA UTILITY F£D SURVEY:  DECEMBER 197P - JANUARY 1979
                                            SECTION I
                     DISI6N AND PERFORMANCE DATA fOR OPERATIONAL F6D 5YSTFMS
	PERFORMANCE DATA	"
PERIOD  MODULE  AVAILABILITY OPEPAPIL1TY ^LIABILITY UTILIZATION  X REMOVAL.    PER   BOILER   FGC   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR

                           MODULE B HAD LOW AVAILABILITY DUE TO THE BURNING  OF  THE  REC1RCUL*TINf
                           PIMP.  IT HAS REMOVED AND STARTED AGAIN AFTER 12  CAYS.
              AFFECTED MODULES: t
  9/77
 11/77
        A
        B
        C
        D
        E
        F
        G
        H
        SYSTEM
 10/77   A
        6
        C
        E
        f
        6
        H
        SYSTEM
            93.0
            94.0
            89.0
            90.0
            93.0
            95.0
            9?.0
            9J.O
            9?.0

            91.0
            96.0
            89.0
            94.0
            93.0
            94.0
            89.0
            95.0
            92.0
                                                                               720    524
                                                                               744    456
        **  PROBLEMS/SOLUTIONS/COMMEN1S
              START DATE  10/77     EOUUSENT: BOILER-RELATED
              END OATS    10/77     PROBISM: NOT DEF1NED/SPFCIFI ED
                           A 12 DAY OITAU IN OCTOBER WAS REQUIRED TO DESLAC THE
              AFFECTED MODULES: SYSTEM
A
B
C
D
E
F
6
H
SYSTIM
93.0
96,0
9!,0
94.0
92.0
93.0
V6.D
95.0
94.0
                                                                               720    234
        *»  PROeLEMS/SOLUTIONS/CCMMENTS
              START DATI  11/77     tSUIPMINTt IOHr»-RILATf 6
              END D*TE    12/77     (CMMfNTi p»SVfNTlVE MAINTfNANCE  SCHfDULED  UNIT  CUTASi
                           TM POILIK KM SHUT DOWN NPVeMfff 15  etCAUSE  OF  A  NlCiSjARY TURBINE
                           OVERHAUL.  THt SOItfR KENT PACK  Rh LINi
              AFFFCTI8 HO&ULiSS SYSTEM
 iz/rr  A
        B
        C
        e
        E
        F
        6
        H
        SYSTIM
            VS.P
            «B.O
            96.0
            96.0
            96.0
            9T.O
            9R.O
            99.0
            97.0
                                                                               744   300
        ••  PRObLEMS/SOLUTlONS/CPMMENTS
              START DATE  12/77     EOUIIMENT:  BOILFR-RELATfD
              END DATE    12/77     PROBLEM: NOT DEFINiC/SPECIflit
                           TJ-ERF WERE A  tf W SMALL SOILiF  RELATED  OUTAGES  TN DICEPIRER.
              AFFECTED MODULES: SYSTEM
  1/78   A
        e
        c
            90.0
            95.0
            95.0
                                                 126

-------
                                            EPA UTILITY FED SURVEY: DECEMBER 1978 - JANUARY 1979
                                          SECTION 3
                   DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL FED SYSTEMS
PERIOD MODULE
D
E
F
6
H
SYSTEM
	 . 	 .. 	 PERFORMANCE DATA 	
AVAILABILITY OPERABUITY ^LIABILITY UTILIZATION
95.0
93.0
94.0
94.0
94.0
94.0
X REMOVAL PER
SOZ PART. HOURS
744
BOILER FGD
HOURS HOURS
300
CAP.
FACTOR

      **  PROBLEMS/SOLUTIONS/COMMENTS
            START DATE   1/78     tOUIFHENT: BOILER-RELATED
            END DATE     1778     ppOfHFM: NOT DEFINED/SPECIFIED
                         THERE WE"I SOIVr BOILER RELATED OUTAGES IN JANUARY, TOTALTN6 ABOUT 50
                         HOURS.
            AFFECTED MODULES: SYSTEM

      «*  PROBLEMS/SOLUT10NS/COKHENTS
            START DATE   1/78     EOUIFMENT: F60 SYSTEM, GENERAL
            END DATE     1/78     COMMENTS:
                         THE FED SYSTFF CONTINUED TO OPERATE WITHOUT ANY PROBLEMS.
            AFFECTED MODULES: SYSTEM
2/7R
3/78
4/78
C
D
E
F
6
H
SYSTEM
C
D
E
F
6
H
S*ST!«
C
D
i
F
i
«
SVSTIW

•*
                  92.0
                  93.0
                  9S.O
                  94.0
                  91.0
                  97.0
                  96.0
                  93.0
                  94.0

                  95.0
                  95.0
                  90.0
                  95.0
                  94.0
                  95,0
                  89.0
                  93.0
                  93.0

                  91.0
                  92.0
                  93.0
                  ¥1.0
                  90.0
                  92.0
                  91.0
                  91.0
                  91.0
                                                                            672   578
                                                                            7*4   741
                                                                             720
            START DAT!   4/78     ISUIMENTs  BOILiR-Rf LAT I B
            END DAT!     4/78     PROB If H I NOT DEMNIB/SPS CIF lit
                         THE BOUIR VAS DOWN  A TOTAL  OF  10E HOURS  IN  APRIL.  THIS  TIME  INCLUDED
                         TKREi OUT APIS HUE TO BOILER  LEAKS AND LACK OF LOAD  REttUIR EMENT.
            AFFECTED MODULES:  SYSTiM

      ** PftOBLEMS/SOLUUONS/COMMENTS
            START DATE   4/78     EOUXfKENT:  REHEATiR
            END PATE     4/78     PROBLEM: NOT DEFINED/SPECIFIED
                        DURING THE POItER OUTAGES  MODIFICATIONS  TO THE F6D  SYSTEM  INCLUDED
                         CHANGING THE  KHEAT  TUBE  BUNDLES.
            AFFECTED MODUltS:  SYSTEM
5/78  A
      B
                  89.0
                  92.0
                                               129

-------
EPA UTILITY  f&D  SURVEY: DECtf<6FR  197P  - JANUARY 1979
                                             SECTION 3
                     DESIGN  AND  PFRFORM AI>CE DATA FOR OPERATIONAL  FGD  SYSTEMS
	PERFORMANCE DATA	
PERIOD  MODULE  AVAILABILITY  CPERARILI T»  ^LIABILITY UTILIZATION   X  REMOVAL   PER  BOILER   FGD   CAP.
                                                                   S02  PART. HOURS HOURS   HOURS FACTOR
c
D
E
F
e
H
SYSTEM
92.0
93.0
92.0
91.0
93.0
86.0
91. C






744 593
        «* PROBLEMS/SOLUTIONS/COMMENTE
              START HATE    5/78      EGUUCENT: BOI LfR-RELATF D
              END DATE      5/78      PROBLFH: NOT DEFINED/SPECIFIED
                            IH WAY THE bOILER WAS DOWN TWjCt  FOR  A TOTAL OF 15 HOURS.   OUTAGES HERE
                            AEAIN CAUSED tY BOILFR LEAKS.
              AFFFCTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COKMENTS
              START DATE    5/7?      ICUIffENT: FGD SYSTEM,  GENERAL
              END DATE      5/7K      PROP If H: NOT DEFINED/SPECIFIED
                            GENERAL MAINTENANCE AND REPAIRS  ON  THE FGD SYSTEM CONTINUED.
              AFFECTED MODULES:  SYSTEM

  6/78  SYSTEM                                                                  720    150

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    6/78      tOUIfENT: BOILER-RELATED
              END DATE      fc/78      PROPlfM: NOT D E FIN E D/S PE CI F I ED
                            T^E UNIT fcAS IP FOR ONLY  15  HOURS IN  JUNE.  IN THE FIRST  PKRT  OF  JUNE
                            THERE WERE V0 !LER TUBE LEAKS.   FROM  JUNE 8 TO JUNE 17 A BOILER OUTAGE WAS
                           NECESSARY FOP 
-------
                                              EPA UTILITY  fGD SURVEY: DECFWBER 1978  -  JANUARY  1979
                                            SECTION  3
                     DESIGN  AND PERFORMANCE DATA FOR OPERATIONAL FGD SYSTEMS
PERIOD MODULE A VAIt AEUL ITY ClPERABILITY
                    	PERFORMANCE  DATA	
                     RELIABILITY  UTIL17ATION
X REMOVAL   PER  BOILER   FED    CAP.
S02  PART. HOURS HOURS   HOURS  FACTOR
                           DOUBLE STAGE MST ELIMINATORS.   BETTER MIST ELIMINATION AT  THE  SCRUBBER
                           tXIT WOULD REDUCE THE  FREBUENCY  OF REHEATER CLEANING.
              AFFECTED  MODULES: SYSTEM
 9/78
        A
        e
        c
        D
        f.
        F
        6
        H
        SYSTEM
 10/78   A
  U79
        C
         0
        I
        f
        G
        H
        SYSTEM
96.0
96.0
96.0
V6.0
96.0
96.0
95.0
97.0
96.0

96.0
96.0
9S.O
97.0
97.0
98.n
97.0
96.0
97.0
                    7ZO
              744    255
        *» PROBLEMS/SOLUT10NS/COMMENTS
              START DATE  10/78      teUIIMENT:  FGD  SYSTEM, GENERAL
              END DATE    11/78      COMMENTS:
                           TtiE UTILITY  REPORTED THAT NO UNUSUAL OPERATINS PROBLEMS WERE  ENCOUNTERED)
              AFFFCTtO MODULES;  SYSTEM
11/78








12/78








A
B
C
D
E
F
G
H
SYSTEM
A
B
C
D
E
F
6
H
SYSTEM
92.0
95.0
94.0
93.0
94.0
93.0
94.0
96.0
94.0
97.9
9?. 9
94.0
95.0
94.7
90.5
94.4
94.7

                                                                                720    7?0
                                                                                744    239

        ** PROBLEMS/&OLUTIONS/COMMENTS
              START  DATE   1Z/78      ECUIFMENT: BOILER-RELATF.D
              END DATE      1/79
                            DIKING THIS PtRIOD THE UNIT EXPERIENCED  A MULTITUDE  OF  COILER  OUTAGES.
              AFFECTED MODULES:  SYSTEM
A
B
C
D
E
F
6
H
SYSTEM
95.6
96.5
97. Z
96.3
90.7
97.2
97.2
95.4

                                                                                744   205
                                                 151

-------
fP» UTILITY  F6D SURVFYt  DECEMBER 1978  - JANUARY 1979
                                            SECTION 3
                     DESIGN AND PERFORMA^E DATA FOR OPERATIONAL FGO SYSTEMS
 COMPANY  NAMf
 PLANT  NAME
 UNIT NUMPER
 CITY
 STATE
 REGULATORY  CLASSIFICATION
 PARTICULATE  EMISSION LIMITATION - l\iG/J
 S02  EMISSION  LIMITATION - NG/J
 NET  PLANT GENERATING CAPACITY - MW
 GROSS  UNIT  GENERATING CAPACITY - MW
 NFT  UNIT GENERATING CAPACITY V/FGD - Mk
 HE!  UNIT GENERATING CAPACITY WO/Ffit - !•«
 EQUIVALENT  SCRUBBED CAPACITY - MW

 **  BOILFR CATA
      SUPPLIER
      TYPE
      SERVICE LOAD
      COMMERCIAL SERVICE DATt
      MAXIMUM bOUER FLUE GAS FLOW - CU.f/S
      FLUE GAS  TEMPERATURE - C
      STACK HEIGHT - M
      STACK TOP DIAMETER - «

  **  FUEL DATA
      FUEL TYPE
      FUEL GRADE
      AVERAGE HEAT CONTENT - KJ/KG
      RANGE HEAT CONTENT - BTU/LI
      AVERAGE ASH CONTENT -  *
      RANCE ASH CONTENT - %
      AVERAGE MOISTURE CONTENT - X
      RANGE M01STURF CONTENT - X
      AVERAGE SULFUR CONTENT - J
      RANGE SULFUR CONTENT - X
      AVERAGE CHLORIDE CONTENT - K
      RANGE CHLORIDE CONTENT - X
      FUEL FIRING RATE - M T /H
      FUEL FIRING RATE - MW

  ** ESP
      TYpE
      SUPPLIER
      FLUE GAS TEMPERATURE - C
      PRESSURE DROP  -  KPA

  •* F6D  SYSTEM
      SALEABLE PRODUCT/T HRCW AWAY PRODUCT
      GENERAL PROCESS  TYPC
      PROCESS TYPE
      SYSTEM SUPPLIER
      DEVELOPMENT LEVEL
      NEW/RETROFIT
      PARTICULATE DESIGN  REMCVAL EFFICIENT
      502  DESIGN REMOVAL  EFFICITNCY  -  X
      COMMERCIAL DATE
      INITIAL START-UP

  ** ABSORBER
      TYPE
      INITIAL  START  UP
      INTERNAL MATERIAL
      PRESSURE DROP  - KPA
                  .100 LP/KMETU)
                  .300 LB/MMBTU)
KANSAS POWER i LIGHT
JEFFREY
1
WAME60
KANSAS
fl
   43.         (
  129.         <
 2720.0
  720.0
 . 680.0
*******
  540.0
COMBUSTION ENGINEERING
TANGFNTIALLY FIRED PULVERI7EO COAL
BASE
** /**
********       (A****** ACFM)
  135.6        < 276 F>
  18%         < «00 FT)
*******        {***** FT)
COAL
******
                (  812S BTU/LP)
                ******
    5. «0
******
   30.00
******
     .32
** ****
     .01
******
  ?26.7
* ****
COLD SIDE
C-E WALTHER
  11?.6
     .2
                (250  TPH)
                   276  F>
                     1  IN-H20)
THROWAWAY PRODUCT
WET SCRUBBING
LIMESTONE
COMBUSTION  ENGINEERING
FULL-SCALE
NEW
   99.0o
   60.00
 8/78
 8/78
  S
VERTICAL  SPRAY  TOWER  (PRESSURIZED)
  8/78
JKL SS
    1.0         (  4.0  IN-H20)
  ** ABSORBER
      NUMBER
      TYPE
      INITIAL  START  UP
      INTERNAL MATERIAL
      PRESSURE DROP  - KPA
  1
 VERTICAL  SPRAY  TOWER  (PRESSURIZED) (SPARE)
  8/7R
 316L  SS
     1.0         (  4.0  1N-H20)
  ** FANS
      NUMBER
      TYPF
 00ILFR  I.D.
                                                 132

-------
                                             EPA  UTILITY FRO SURVEY: DECEMBER  1476 - JANUARY 1979
                                           SECTION  3
                   DESIGN  AND  PERFORMANCE  DATA  FOR OPERATIONAL F60 SVSTFMS
** HIST ELIMINATOR
    TYpE
    CONSTRUCTION  MATERIAL
    CONFIGURATION
    NUMBER OF  PASSES
    FREEBOARD  DISTANCE  - M
    VANE SPACING  -  CM
    VANE ANGLES
    WASH SYSTEM

** TANKS
    SERVICE
     REACTION  TANKS

 **  REHEATER
     TYPE

 **  WATER  LOOP
     TYPE
     FRESH MAKEUP WATER  ADDITION - L1TER5/S

 **  REAGENT PREPARATION  EQUIPMENT
     NUMBER OF BALL  MILLS
     BALL  MILL CAPACITY- M 1/H

 **  TREATMENT
     TYPE
     PRODUCT CHARACTERISTICS

 *•  DISPOSAL
     NATURE
     TYPE
     LOCATION
     TRANSPORTATION
CHEVRON
FIBERGLASS
HORIZONTAL
    2
    1.22       ( 4.0 FT)
    5.1        ( 2.00 IN)
45 DE6
POND WATER, 150 PSI6
NUMBER

   It


BYPASS
CLOSED
   35.1
    1
   10.9
(   557  GPW)
(  12.0  TPH)
NON-PROPRIETARY
MIXED WITH BOTTOM ASH
FINAL
UNLINID POND
Oft SITE 1 MILE FROM PLANT
PUMPFD
.........._--.,.-----.	._	......_._.-_pERFORMANCE DATA--—
PERIOD MODULE AVAILABILITY OPERABILITV HELIABILITY UTILIZATION
                x REMOVAL
                $02  PART.
             PER   BOILER   FGD    CAP.
            HOURS HOURS   HOURS  FACTOR
 6/78  SYSTEM
                                                                             744
       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   8/78     EfiiJI FMENTs FGD SYSTEM, GENERAL
             END DATE     9y78     COMMENTS:
                          THE SYSTEM IS IN THE SHAKEDOWN PHASE OF OPERATION.  EACH OF THE SIX
                          MODULES OPERATED DURING THIS PERIOD.  NO MAJOR PROBLEMS WERE REPORTtD.
                          INTEGRATED OPERATION OF THE SYSTEM IS EXPECTED DURING THE FIRST HALF OF
                          OCTOBER.
             AFFECTED MODULES: SYSTEM
 9/78  SYSTEM

10/78  SYSTEM
                             720

                             744
       •• PROBLEMS/SOLUTIONS/COMKENTS
             START DATE  10/78     EQUIPMENT: FGD SYSTEM, GENERAL
             END DATE    11/78     COMMENTS:
                          UTERRATft) OPERATION FOR THIS UNIT HAS NOT VET BEEN ACHIEVED.  A CERTIF-
                          ICATION TEST MUCH HAD BEEN SCHEDULED HAD TO BE CANCELLED DUE TO A BOILER
                          OUTAGE.  AT THIS TIME THE COLD WEATHER HAS FORCED POSTPONMENT OF THE TEST
                          ^DEFINITELY.  MEANWHILE INTERMITTENT F6D OPERATIONS CONTINUE.
             AFFECTED MODULES: SYSTEM
11/78  SYSTEM

12/78  SYSTEM
                              720

                              744
       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE  12/78     ECUIIMENT: F6D SYSTEM, GENERAL
             END DATE     1/79     COMMENTS:
                                               133

-------
    UTILITY F6D SURVEY:  OECfcMBES 1978 - JANUARY  1979

                                             SECTION  3
                     DESIGN AND PERFORMAKCE  DATA  FOR OPERATIONAL FGD SYSTEMS
			PERFORMANCE  DATA	
PERIOD NODULE  AVAILABILITY OPECABILITY  PLIABILITY  UTILIZATION  X REMOVAL   PER   BOILER  FGO   "P.
                                                                  S02  PART. HOURS  HOURS  HOURS FACTOR

                           NO PROBLEMS HAVE  BEEN  REPORTED FOR THIS PERIOD*
              AFFECTED MODULES: SYSTEM

 1/79  SYSTEM                                                                   744
                                                 1S4

-------
                                             EPA  UTILITY FED SURVEY: DECEMBER 1978  - JANUARY  1979
                                           SECTION 3
                   DESIGN  AND  PERFORMAKE  DATA FOR OPERATIONAL FED SYSTEMS
COMPANY NAME
PLANT NAMF
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICIPATE EMISSION LIMITATION - N6/J
S02 EMISSION LIMITATION  -  NG/J
NET PLANT GENERATING CAPACITY  - MV
GROSS UNIT GENERATING  CAPACITY  - MU
NET UNIT GENERATING CAPACITY W/FGD - M*
NET UNIT GENERATING CAPACITY WO/FGD - PW
EQUIVALENT SCRUBBED CAPACITY -  MW

** BOILER DATA
    SUPPLIER
    TYPF
    SERVICE LOAD
    COMMERCIAL  SERVICE DATE
    MAXIMUM bOlltR  FLUE  6A S FLOW - CU.f/S
    FLUE GAS TEMPERATURE  -  C
    STACK HEIGHT  -  M
    STACK TOP  DIAMETER - M

** FUEL  DATA
    FUEL TYPE
    FUEL GRADE
    AVERAGE HEA1  CONTENT -  KJ/KG
    RANGE HEAT  CONTENT - BTU/LB
    AVERAGE ASH CONTENT - I
    RANGE ASH  CONTENT  - g
    AVERAGE MOISTURE  CONTENT - X
     RANGE MOISTURE  CONTENT  - *
    AVERAGE SULFUR  CONTENT  - *
     RANGE SULFUR  CONTENT - *
     AVERAGE CHLORIDE  CONTEKT - 2
     RANGE CHLORIDE  CONTENT  - X
     FUEL  FIRING RATE  - M T/H
     FUEL  FIRING RATE  - MM

 **  PARTICULATE  SCRUBBER
     NUMBER
     TYPE
     SUPPLIER
     NUMBER  OF  STAGES
     LINING  MATERIAL
     INTERNAL  MATERIAL
     TYPE OF NOZZLES
     BOILER  LOAD/SCRUBBER - X
     FLUE  6AS  CAPACITY - CU.M/S
     FLUE GAS  TEMPERATURE - C
     Lieuie  RECIRCULATION RATE  - LITER/:
     L/G RATIO  - LITER/CU.M
     PRESSURE  DROP - KPA
     PARTICULATE INLET LOAD - 6/CU.K
     S02 INLET CONCENTRATION -  PPM

 **  FGD SYSTEM
     SALEABLE  PRODUCT/THROWAWAV PRODUCT
     GENERAL PROCESS TYPE
     PROCESS TYPF
     SYSTEM  SUPPLIER
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     PARTICULATE DF-SIGN REMOVAL EFFIC1EHCY
     S<)2 DESIGN REMOVAL EFFICIENCY  -  X
     INITIAL START-UP

 ** ABSORBER
    KANSAS  POWFK  &  LIGHT
    LAWRENCE
     TYPE
     INITIAL START UP
     SUPPLIER
     NUMBER OF STAGES
     SHELL MATERIAL
     INTERNAL MATERIAL
                       .100 LB/MMBTU)
                       .300 LB/MMBTU)
LAWRENCE
KANSAS
B
   43.          (
  129.          (
*******
  125.0
  115.0
*******
  125.0
    COMBUSTION  ENGINEERING
    PULV.  COAL, BALANCED  DRAFT, TAN6ENTEALLY FIRED
    CYCLIC
      0/59
       190.18
       137.B
        37.
         2.4
     COAL
     ******
      23260.

         9.(tO
     ******
     ********
     ******
          .55
     ******
          .03
     ******
        45.3
       115
                ( 403000 ACFH)
                < 280  F)
                < 120  FT>
                <  8.0  FT)
                <  10000 BTU/LB)
                * **** *
                (  50 TPH)
     RECTANGULAR VARIABLE THROAT ROB DECK VENTURI
     COMBUSTION ENGINEERING
         1
     316L SS  APPROACH AND THROAT
     RUBBfR COATED  FIBERGLASS (NOREL) ROITS
     NON-ATOMIZINGf FAN TYPE SPRAY
        50.0
        95.1
       137.8
       226.6
         2.4
         2.2
                  201500  ACFM)
                   280  F)
                  3600  GPM)
                 18.0  SAL/1COOACF)
                    9  IN-H20)
                   3.03 GK/SCF)
          .748
     THROVAWAY PRODUCT
     WET SCRUBBING
     LIMESTONE
     COMBUSTION ENGINEERING
     FULL-SCALE
     RETROFIT
. *     98.9Q
        73.00
      1/.76
     VERTICAL COUNTERCURRENT SPRAY TOWER
      1/76
     COMeUSTION ENGINEERING
         2
     316L SS
     HEADERS OF FRP
                                                135

-------
EPA UTILITY F6D SURVEY:  DECtCfER  197f  -  JANUARY 1979
                                            SECTION 3
                     DESIGN  AND  PE R f ORCi A kC E DATA FOR OPERATIONAL FGD SYSTEMS
      MUMPER  OF  NOZZLES
      BOILER  LOAD/ABSORB EH  - X
      GAS  flOk  - CU.n/S
      GAS  TEMPERATURE  -  C
      LIQUlt*  RECIRCULAT10N  RATE - LIlfK/S
      L/6  RATIO - L/CU.K
      PRESSURE  DROP - KPA
      PARTICIPATE OUTLET  LOAD- G/CU.K
      PARTICULATE REMOVAL EFFICIENCY - *
      S02  OUTLET CONTPATJON - PPK
      S02  DESIGN REMOVAL  EFFICIENCY - X

  ** FANS
      NUMPER

  ** WIST  ELIMINATOR
      NUMBER
      TYPF
      CONSTRUCTION MATERIAL
      CONFIGURATION
      WASH SYSTEM

  *« MIST ELIMINATOR
      NUMPER
      TYPE
      CONSTRUCTION MATERIAL
      WASH SYSTEM

  ** PKOCtSS CONTROL CHEMISTRY
      CONTROL  VARIABLES
      CONTROL  RANGE
      CONTROL  MANNER
      MODE
      SENSOR LOCATION

  **  PUMPS
      SERVICE
       SLURRY  FEED  PUMPS  (SCREW  TYpE)
       MIST ELIMINATOR  MASH  PUMPS
       MILL SLURRY  PUMPS
       CLASSIFICATION TANK  TRANSFCR
       RECYCLE  SPRAY PUMPS

   **  TANKS
       SERVICE
       TOHifi  R6 CIRCULATION
       VENTURI  REC18CUIAT10N TANK
       CLARIFICATION AND COLLECTION TANK
       DILUTION  AND STORAGE  TANK
       RCACTICN  TANK BtiiD TAKK

   **  RIHIATIR
       TVpi
       HIATIH6  NfoIU*
       TINPfRATURi BOOST - C
       INfRSY
               <  174500 ACFM)
               <   12*  F>
               <  5300  6Pw)
               (  30.0  6AL/1000ACF)
               <  2.5 IN-H20)
               (   .032 SR/SCFJ
 3?
 5P.O
 8?. 3 5
 51.1
134.
  4.0
   .6
   .1
 9P.9
200
 77.0
 8
CHEVRON
FRP

INTERMITTENT, HIGH PRESSURE HATER WASH DIRECTED
BULK ENTRAIMMENT SEPARATOR

INTERMITTENT, HIGH PRESSURE WATER WASH  DIRECTED


SO?, SLURRY FLOWS, PH, X SOLIBS» PRESSURE  DROP
PH * 5.5-5.?
AUTOMATIC
FEEDBACK
PH PROBES IN REACTION TANKS
NURSCR
   6
****
   3
   3
+ ***
 IN-LINi
 HOT  WATIR
    11,1         <   20 F)
 1.15*  OF  BOILER OUTPUT
   **
       NUMBER
   *«  WATER  LOOP
       TYPE

   **  REACfNT PREPARATION EQUIPKINT
       NUMPER OF BALL MILLS

   *•  TREATMENT
       TYPI
       INLFT- K6/S
       INLET SOLIDS - X
 CLOSF6
 NONPfOPRIETARY; FORCED OXIDATION WITH AIR
   1fl1.?        (1339Z LB/HIN)
    32. 5
                                                 136

-------
                                               EPA UTILITY  FGD  SURVEY: DECEMBER  1978 - JANUARY  1979
                                             SECTION 3
                    DESIGN AND PERFORMANCE  DATA FOR OPERATIONAL FGD SYSTEMS
• *  DISPOSAL
     NATURE                                       INTERIM
     TVPE                                          UNLINED POND
     LOCATION                                     ON-SITE
     AREA  - ACRES                                    16.0

«*  DISPOSAL
     NATURE                                       FINAL
     TYPE                                          UNLINED POND
     LOCATION                                     ON-SITE
     TRANSPORTATION                               OVERFLOW  FROM  INTERIM SLUDGE  POND
     AREA  - ACRES                                     4.0

**  DISPOSAL
     NATURE                                       FINAL
     TYPE                                          UNLINED POND
     LOCATION                                     ON-SJTE
     TRANSPORTATION                               OVERFLOW  FROM  INTERIM SLUDGE  POND
     AREA  - ACRES                                    2P.O

**  DISPOSAL
     NATURE                                       FINAL
     TYPE                                          SLUDGE POND
     LOCATION                                     ON-SITE
     AREA - ACRES                                    28.0

 **  DISPOSAL
     NATURE                                       FINAL
     TYPE                                         SLUDGE POND
     LOCATION                                     ON-SITE
     AREA - ACRES                                     4.0
	..	PERFORMANCE  DATA	
PERIOD NODULE AVAILABILITY CPERflBILITY  ^LIABILITY UTILIZATION  X REMOVAL   PER   BOILER  FGO   CAP.
                                                                   S02  PART.  HOURS HOURS  HOURS  FACTOR


 0/70  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   0/70      EOUIHHENT: FGD SYSTEM,  GENERAL
              END  DATE     0/70      CCKM fNTS:
                           MAJOR  MODIFICATIONS IN 1970  WERE SANDBLASTING AND COATING OF THE INTERIOR
                           0-l-TH-E-S-dHJBBfR-S-i R EPtACEMENT -Of ALL INTERNAL STEEL~ PIPES WITH PLASTIC  AND
                           FIBERGLASSt AM) REPLACEMENT  OF  STAINLESS STEEL  DEMISTERS WITH FIBERGLASS.
                           SINCE  DEMISTEf PLUGGING WAS  NOT  COMPLETELY ELIMINATED, THE UNIT HAS  WASHED
                           MANUALLY EVER\ NI&HT TO MAINTAIN THE REflUlRED OUTPUT.
              AFFECTED MODULES:  SYSTEM

 0/72  SYSTEM

       ** PROBLEMS/SOLUTIONS/CCMMENTS
              START DATE   0/72      EGUIPMENT: FGD SYSTEM,  GENERAL
              END  DATE     0/72      COMMENTS:
                           TfcE MODIFICATIONS IN THE SUMMER  OF 1972 ON THE  TWO  FGD MODULES INCLUDED
                           ENLARGEMENT OF THE CRYSTALLIZATION TANK, AND INSTALLATION OF NEW PLASTIC
                           SPRAY  NOZZLES, NEW SLURRY  PUMPS  A(|D STR A1NERS ,A ND NEW   MULTIPLE MIXERS
                           I* THE TANK.   PROBLEMS THAT  REMAINED INCLUDED CORROSION, INEFFICIENT
                           DAMPERS, EXPAhSlON JOINT FAILURE, DEMISTEft FOULING, RAPID EROSION OF THE
                           SLURRY PUMP,  ?ND VALVE FAILURE.
              AFFECTED MODULES:  SYSTEM

 0/73  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   0/73      EOUIPMENT: F6D SYSTEM,  GENERAL
              END  DATE     0/73      COKMtNTS:
                           OPERATION Of  1HE FGD SYSTEM  SINCE THE FALL OF  1973  HAS BEEN  THE MOST
                           SUCCESSFUL TO DATE.
              AffECTED MODULES:  SYSTEM

 0/74  SYSTEM



                                                 137

-------
EPA UTILITY  F60  SURVEY: DECEMBER  197f  - JANUARY 1979
                                             SECTION 3
                     DESIfiN  AND  PERFORMAWE DATA FOR OPERATIONAL FGD SYSTEMS
                 	PERFORMANCE  DATA	
PERIOD  MODULE AVAILABILITY  CPERAP1LITY  SELIA6ILITY UTILIZATION   X REMOVAL   PER   BOILER  F60    CAP.
                                                                   SOZ  PART. HOURS  HOURS  HOURS  FACTOR
 6/75   SYSTEM
                                                                                 720
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    6775      EGimPENT: FGD SYSTEM,  GENERAL
              END DATE      6/75      COMMITS:
                            STATION  LOAD  IS REDUCED TO 50 PERCENT EVERYNI6HT.   THEREFOREi ONE OF THE
                            MODULES  CAN RE  TAKEN OFF-LINE NIGHTLY OFR CLEANING  OR  REPAIR.  WYOMING  CCA
                            (1.5  PERCENT  SULFUR) IS BEING BURNED   IN THE BOILER.   SOME NATURAL GAS  HAS
                            BEEN  PURNtp S]NCE JUNE 20.
              AFFECTED MODULES:  SYSTEM
  7/75   SYSTEM
744
8/7;
9/75
10/75
11/75
12/75
1/76

2/76
3/76
4/76
5/76
6/76
7/76
8/76
9/76

10/76
11/76
12/76
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
** PRO
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
** PROl
SYSTEM
SYSTEM
SYSTEM
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    7/75      ECUIFKENT: FGD SYSTEM,  GENERAL
              END DATE      8/75      COMMENTS:
                            EACH  MODULE IS HUT DOUN ONCE  PER  UF.EK  FOR INSPECTION  AND  CLEAN-UP.
              AFFECTED MODULES:  SYSTEM

                                                                                 744

                                                                                 720

                                                                                 744

                                                                                 720

                                                                                 744

                                                                                 744

         * PROULEMS/SOLUTIONS/CCMMENTS
              START DATE    1/76      EQUIPMENTS F6D SYSTEM,  GENERAL
              END DATE      2/76      COMMITS:
                            TOE  UTILITY IS REPLACING THE  SCRUBBING SYSTEM WITH  A  VENTURI-ROD FOLLOWED
                            BY A  SPRAY TOkfR.
              AFFECTED MODULES:  SYSTEM

                                                                                 696

                                                                                 744

                                                                                 720

                                                                                 744

                                                                                 720

                                                                                 744

                                                                                 744

                                                                                 720

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    9/76      EQUIPMENT: BOILER-RELATE 0
              END DATE    12/76      COMMENT: PREVENTIVE  MAINTENANCE SCHEDULED  UNIT  OUTAGE
                            A  SCHECUlEt> UMT OURA6E COMMENCED IN MID-SEPTEMBER  FOR  A TURBINE OVERHAUL
                            AND  RESTARTED IN EARLY JANUARY.
              AFFECTED MODULES:  SYSTEM

                                                                                 744

                                                                                 720

                                                                                 744
                                                 138

-------
                                              EPA  UTILITY F6C SURVEY: DECEMBER 1978  - JANUARY  1979
                                            SECTION 3
                    DESIGN  AND  PERFORWAUCE  DATA FOR OPERATIONAL FGO SYSTEMS
..........	.	..	PERFORMANCE DATA	.......... — -—......
PERIOD MODULE AVAILABILITY  CPERABIL1TY  PLIABILITY UTILIZATION  X REMOVAL   PER  BOILER  F60    CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE   12/76      EQUIPMENT:  BOILER-RELATED
             fcND DATE     12/76      COMMENTS:
                          ThE  UNIT CONTINUES TO FIRE LOU StjLFllR WYOMING COAL.
             AFFECTED MODULES:  SYSTEM

 1/77  SYSTEM                                                                 7*4

       «* PROfcLEMS/SOLUTIONS/COHMENTS
             START  DATE    1/77      EBU11'MENTs  F6D SYSTEM, GENERAL
             END DATE      1/77      COMMENTS:
                           THE  NEW LIMES10NE FGD SYSTEM BECAME COMMERCIALLY OPERABLE IN EARLY
                           JANUARY 1977.  THE UTILITY REPORTS THAT BOTH PARTICIPATE AND $02 REMOVALS
                          ARE  QUITE SATISFACTORY.
             AFFECTED MODULES:  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE    1/77     EOUI I'MENT:  TANK, OTHER
             fcND DATE      3/77     PROBtfM: NOT DEFINED/SPECIFIED
                           MINOR PROBLEM; HAVE  BEEN RELATED TO MAINTAINING DESIRED SOLIDS LEVEL  IN TH
                           MAKE-UP TANK.  MODIFICATIOON PLANS INCLUDE CESSATION OF SLURRY DILUTION,
                           WHICH CURRENTLY PRECEDES THE INTRODUCTION OF THE FRESH LIMESTONE SLURRY
                           IMO THE RECI KCULATION LOOP.  THE UTILITY PLANS TO PUMP THE 35 PERCENT
                           SCLIDS SLURRY DIRECTLY FROM THE SLURRY TANK INTO THE RECIRCULATION LOOP.
             AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE    1/77     EQUIPMENT:  PUMP, OTHER
             END  DATE      3/77     COMMENTS:
                           CURRENTLY SEVERAL DIFFERENT MAKES UF SLURRY PUMPS ARE BEING USED.  ALL ARE
                           FUNCTIONING WELL SO  FAR.  THE PUMPS HAVE NOT BFEN TN SERVICE LON6 ENOUGH
                           FCR COMPARISONS TO BE DRAWN.
             AFFECTED  MODULES: SYSTEM

  2/77  SYSTEM                                                                 672

  3/77  SYSTEM                                                                 744

  4/77  SYSTEM                                                                 720

        *•  PR06LEMS/SOLUT10NS/COMMENTS
              START  DATE    4/77     tCUIFKENT: FGD SYSTEM. GENERAL
              END  DATE      5/77     COMMENTS:
                           THE SCRUBBER t.AS NOT REQUIRED FOR SERVICE DURING THE REPORT PERIOD BECAUSE
                           NATURAL GAS UfS FIRED IN THE BOILER.
              AFFECTED  MODULES: SYSTEM

  5/77  SYSTEM                                                                 744

  6/77  SYSTEM                                                                 720

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    6/77     EQUIPMENT: F6D SYSTEM, GENERAL
              tNo  DATE      7/77     COMMENTS:
                           THE NO. J BOIlfR HAS BEEN  FIRING  10[)X NATURAL 6AS  FOR ALL  BUT 8-10  BAYS
                           SINCE THE PE6JNNING OF  APRIL  1977.
              AFFECTED  MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   6/77     EQUIFMENT: MIST  ELIMINATOR
              END BATE      7/77     PROPtPM: NOT DEFINED/SPECIFIED
                           MIST ELIWINATCfi CRACKS  HAVE  BEEN  A  PROBLEM.
              AFFECTED  MODULES: SYSTEM

        *•  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/77     EQUIPMENT:  RECYCLE  TANK
              END BATE      7/77     PROBlCM: NOT  DEFINED/SPECIFIED



                                                139

-------
FPA UTILITY  F6D SURVEY: DECEMBER  197f  - JANUARY 1979
                                             SECTION  3
                     OES16N  AND  PERFORMAI,Ct DATA FOR OPERATIONAL F6D SYSTEMS
	PERFORMANCE  DATA	~'	
PERIOD  MODULE AVAILABILITY  OPERABILITY PLIABILITY UTILIZATION  X REMOVAL    PER   BOILER  F.6D    "P.
                                                                   S02  PART.  HOURS HOURS  HOURS  FACTOR

                            A  COMPRESSOR IREAKDOWN IN  TH§  RECYCLE TANK AIR A61TATION SYSTEM AND  THE
                            RECYCLE  TAMt STRAINER SCREEN WASH HAVE BEEN PROBLEM  AREAS.
              AFFECTED MODULES: SYSTCI"

        ** PROBLEMS/SOLUT10NS/COKKENTS
              START DATE    6/77     IGUirfENT: AUXILIARY  EQUIPMENT
              END DATE      7/77
                            SCOT BLOKER PFOBLEMS WERE  ENCOUNTERED.
              AFfCCTED MODULES: SYSTEM

        •* PR06LEMS/SOLUTIONS/COMKENTS:
              START DATE    fc/77     E6UIFMENT: PUMP,  OTHER
              END DATE      6/77     PROBlFM: NOT DEFINED/SPFCIFI ED
                            THE DENVER SLIRRY PUMPS  ARE  EXPERIENCES SOME ON-60IN6 PRCBLEMSt  WHILE
                            THE ALLEN-SHE M«AN-HOFF PUMPS ARE  OPERATING SATISFACTORILY.
              AFFECTED MODULES: SYSTEI"
  7/77  SYSTEM

  8/77  SYSTEK
                                                                         7*4

                                                                         744
        ** PROfiLEMS/SOLUTIONS/COMMENTS
               START  DATE    8/77     EOUIFtfENT:  FSD  SYSTEM,  GENERAL
               END DATE      8/77     COMMtNTS:
                            ThE BOILER BURKED NATURAL  GAS THROUGHOUT All BUST.
               AFFECTED  MODULES: SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
               START  DATE    */77     EOUIfflENT:  BIST ELIMINATOR
               END DATE      8/77     COKMlNTS:
                            ThE MIST ELIMINATOR  CRACKS H^VE  pt!=N REPAIRED.
               AFFECTED  MODULES: SYSTEM
»* PROBLEMS/SOLUTIONS/COMMENTS
      START DAjF-    fi/77      EOl)III«ENT: RECYCLE  TANK
      END DATE      9/77      PROBtFM: NOT DEFINED/SPECIFIED
                    THE  RECYCLE TMK STRAINER  PROBLEMS PERSISTED
                    ccMpfiEssofv UA: MALFUNCTIONING.
      AFFECTED MODULES:  SYSTEM
                                                                               THE AIR AGITATION  SYSTEM
** PROBLEMS/SOLUTIONS/COMMENTS
      START DATE    8/77      EGUIFftENT: PUMP,  OTHER
      END DATE      9/77      COHMENTSj
                    TltE  DENVER SLIRRY PUMPS  ARE  FUNCTIONING ADEQUATELY  AT PRFSENT.
                    GLAND PACKING ARE BEING  REDESIGNED.
      AFFECTED MODULES:  SYSTEM
                                                                                               THE  PUMP
  9/77  SYSTEM
                                                                         720
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    9/77     E6UIfHENT:  BOILER-RELATED
              END  DATE      9/77     COMMFNTS:
                            AS OF SEPTEMEUR  15  THE  UNIT BURNTD COAL.
              AFFECTED  MODULES: SYSTEM
 10/77  SYSTEM
                                                                                 744
        *« PROBLEMS/SOLUTIONS/CCMMENTS
              START  DATE   10/77     n«UlPNENT:  FGD  SYSTEM* GENERAL
              END DATE     10/77     COMMfNTSj
                            THE SYSTEM CAPACITY  WAS  CUT BACK TO  50  PERCENT IN OCTOBER BECAUSE A NEU
                            COOLING TOUER IS  BEING  CONSTRUCTED.
              AFFECTED  MODULES: SYSTEM
 11/77  SYSTEM
                                                                         720
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   11/77     EGUir«ENT:  FCD SYSTEM, GENERAL
              END DATE     11/77     PROBLEM:  NOT DEFINED/SPECIFI ED
                                                  140

-------
                                              EPA UTILITY  FGD  SURVEY: DECEMBER 1978 - JANUARY  1979
                                            SECTION 3
                    DESIGN  AND PERFORKAf,CE DATA FOR OPERATIONAL  F6D SYSTEMS
...	.	....	PERFORMANCE  DATA	
PERIOD HOODIE AVAILABILITY CPERA6ILITY GFLIABILITY UTILIZATION   *  REMOVAL   PER  BOILER  FGD   CAP.
                                                                  S02  PART. HOURS HOURS  HOURS  FACTOR

                           Oh NOVEMBER 19 A MAJOR  FGD  SYSTEK OVERHAUL TOOK PLACE WHILE THE TURBINE
                           WAS DWON FOR INSPECTION AND  THE  NEW  COOLING TOWER WAS BEING CONNECTED.
              AFFECTED  MODULES: SYSTEM

12/77  SYSTEM                                                                  744

       ** PROULEMS/SOLUTIONS/COMHENTS
              START DATE   12/77     J8UIFMENT:  FGD SYSTEM,  GENERAL
              END DATE     12/77     COFIMtNTS:
                           THE UNIT CAME BACK ON LINE  DECEMBER  20 AT FULL CAPACITY.
              AFFECTED  MODULES; SYSTEM

  1/78  SYSTEM                                                                  744

       •* PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    1/78     EQUIPMENT:  PIPING
              END DATE      1/7B     PSOEUEM: WEATHER-RELATED COMPONENT FAILURE
                           TfcE F60 SYSTEP* OPERATED WITHOUT  ANY  PROBLEMS OTHER THAN SOME FREEZIN6 OF
                           THE PIPELINES.
              AFFECTED  MODULES: SYSTEM

       ** PR08LEMS/SOLUTIONS/COHMENTS
              START DATE    1/78     ESUIFMENT:  THICKENER
              END DATE      1/78     PROBLEM: PLUGGING.  OTHER
                           DISCHARGE LINt FREEZING CAUSED  CLARIFIES PLUGGING.
              AFFECTED  MODULES: SYSTEM

  2/76   SYSTEM                                                                 672

        **  PROBLEMS/SOLUTIONS/COMHENTS
              START DATE    2/78     tOUKMENT:  PIPING
              END DATE      J/78
                           THE THICKENER  UNDERFLOW LINE IS  STILL FROZEN AND TWO 3 INCH DIAMETER FIRE
                           HCSES ARE BEIfiG  USED TO PUMP THE  UNDERFLOW SOLIDS TO THE POND.
              AFFECTED  MODULES: SYSTEM

  3/78   SYSTEM                                                                 744

  4/78   SYSTEM                                                                 ??0

  5/7$   SYSTEM                                                                 744

  6/78   SYSTEM                                                                 720

        •*  PROBLENS/SOLUTIONS/CCMMENTS
              START DATE   6/78     EQUIPMENT:  F6D  SYSTEM,  GENERAL
              END DATE      7/78     COMMENTS:
                           THE BOILER  AND  FGD  SYSTEM  BOTH  OPERATED  THROUGHOUT THE PERIOD WITHOUT
                           AkV FORCED  OU1A6ES.
              AFFECTED  MODULES: SYSTEM

  7/78   SfSTEM                                                                 744

  8/78   SYSTEM                                                                 744

        **  PHOBLEMS/SOLUTIONS/COHMENTS
              START DATE   6/78     EBUIFMENT:  F6D  SYSTEM, GENERAL
              END DATE      9/78     COMMENTS:
                           THE UTILITY  RfPORTED THAT  THE SYSTEM  R*N WITH  NO  FORCED OUTAGES  DURING  THE
                           PERIOD.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   8/78     EClUJFKENT:  BOILER-RELATED
              END DATE     8/78     COMMENT:  PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                           THE SYSTEM  RAt CONTINUOUSLY THROUGHOUT  THE  PERIOD WITH THE EXCEPTION OF A
                           ONE WEEK OUTACE  FOR  A BOILER-TURBINE  INSPECTION.
                                                 HI

-------
EPA UTILITY  F6D SURVEY: OECEWRFR  1P7f  - JANUARY 1979
                                             SECTION 3
                     OES1EN  AND  PFRFORMAKE DATA FOR OPERATIONAL FGD SYSTFMS
	PERFORMANCE  DATA	"" "
PERIOD  MODULE AVAILABILITY  CPERA61LITY PLIABILITY UTILIZATION  Ji REMOVAL    PER   BOILER  F 6 D   CAP.
                                                                   S02  PART.  HOURS HOURS  HOURS  FACTOR

              AFFECTED MODULES:  SYSTEM

  9/78   SYSTEM                                                                   720

        •*  PROBLtMS/SOLUTlONS/CCMMENTS
              START DATE    9/78      tGUIFHENT: BOILER-RELATED
              tND DATF      9/78      COMM[NT: PREVENTIVE  MAINTENANCE SCHEDULED  UNIT  OUTAGE
                            THE  UNIT  kAS f.OUN THE LAST WEEK  AhD  A HALF IN SEPTEMBER  FOR A SCHEDULED
                            FALL  TURPINE/'fOILER CUTA6E.   ROUTINE MAINTENANCE  INCLUDES  BOILER  AND
                            TURBINE  CLEANING AND REPAIR.
              AFFFCTED MODULES:  SYSTEM

10/78   SYSTEM                                                                   744

11/78   SYSTEM                                                                   720

12/78   SYSTEM                                                                   744

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   12/78      EQUIPMENT: F6D SYSTEM,  GENERAL
              END DATE     12/78      COMMfNTS:
                           AN fPA SPONSORtD CONTINUOUS MONITORING TEST BEGAN  AT THIS  UNIT AT  THE
                           BFEINNING  OF OiCEWBER AND WILL CONTINUE THROUGH THE  END Qf  JANUARY.  THE
                           TEST  INtfOLVfS 24 HOUR MONITORING  OF S02,OPACITY AND  NOX.
              AFFECTED MODULES:  SYSTEM

  1/79   SYSTEM                                                                   744

  2/79   SYSTEM                                                                   672

        **  PR06LEMS/SOLUTIONS/CCMMENTS
              START DATE    2/79      tCUIFKENT: A6ITATOR
              END DATE      2/79      PPOBtrMr COMPONENT  FAILURE, OTHER
                            ONE  MODULE WAT FORCED OUT OF  SERVICE FOR 2 DAyS WHEN  ITS  TANK AGITATOR
                            FAILED.
              AFFECTED MODULES:  SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMCNTS
              START DATE    2/79      EOUIfMENT: FAN
              EN* DATE      2/79      fRCBtfMr NOT DEFINED/SPECIFIED
                            OKE  MODULE WAI FORCED OUT OF  SERVICE FOR AN 8 CAY PERIOD  DUE TO A FAN
                            MOTOR MALFUNCTION*
              AFFECTED MODULES:  SYSTEM
                                                 142

-------
                                            EPA UTILITY  FGD  SURVEY:  DECEMBER 1978 - JANUARY 1979
                                          SECTION 3
                   DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL  FED SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATt
REGULATORY CLASSIFICATION
PART1CULATE EMISSION  LIMITATION -
S02 EMISSION LIMITATION - NG/J
NpT PLANT 6ENERATJNG  CAPACITY - MU
CROSS UNIT GENERATING CAPACITY - Mk
NET UNIT GENERATING  CAPACITY W/F6D - « fc
NET UNIT GENERATING  CAPACITY WCVFCt - PW
EQUIVALENT SCRUBBED  CAPACITY - Wfcl

** BOILER DATA
    SUPPLIER
    TYPF
    SERVICE LOAD
    COMMERCIAL  SERVICE DATE
    MAXIMUM BOILER FLUE GAS FLOW - CU.c/S
    FLUF 6AS TEMPERATURE - C
    STACK HE I6HT  - M
    STACK TOP  DIAMETER - M

**  FUEL  DATA
    FUEL TYPE
    FUEL GRADE
    AVERAGE HEAT  CONTENT - KJ/KG
    RANGE HEAT  CONTENT - bTl/Lf
    AVERAGE ASH CONTENT - X
    RANGE  ASH  CONTENT - X
    AVERAGE MOISTURE CONTENT - X
    RANGE  MOISTURE CONTENT - X
    AVERAGE SULFUR CONTENT - X
    RANGE  SULFUR  CONTENT - X
    AVERAGE  CHLORIDE CONTENT
    RANGE  CHLORIDF CONTENT - X
     FUEL  FIRING RATE - M T/H
     FUEL  FIRING RATE - MW

 **  PARTICULATE  SCRUBBER
                             - X
    TYPE
    SUPPLIER
    NUMFER OF STAGES
    LINING MATERIAL
    INTERNAL "MATERIAL
    TYPE OF NOZZLES
    BOILER LOAD/SCRUBBER -  X
    FLUE 6 AS CAPACITY - CU.M/S
    FLUE 6AS TEMPERATURE -  C
    LlOUlti REC1RCULATION RATE - LITtK/J
    L/6 RATIO - LITfR/CU.M
    PRESSURE DROP - KPA
    S02 INLFT CONCENTRATION - PPM

** FG6 SYSTEM
    SALEABLE PRODUCT/THROWAWAY PRODUCT
    GENERAL PROCESS TYPE
    PROCESS TVPf
    SYSTEM SUPPLIER
    DEVELOPMENT LEVEL
    NEW/RETROFIT
    PARTICULATE DESIGN REMOVAL EFFICIENCY
    $02 DESIGN REMOVAL EFFICIENCY  -  *
    INITIAL START-UP

** ABSORBER
    NUMBER
    TYPE
    INITIAL START UP
    SUPPLIER
    NUMBER OF STAGES
    SHELL MATERIAL
    INTERNAL MATERIAL
    NUMBER OF NOZ7LES
                                               KANSAS  POWER  8  LIGHT
                                               LAURENCE
                                               5
                                               LAWRENCE
                                               KANSAS
                                               B
                                                   43.          <   .100 LB/MMBTU)
                                                 ?15 .          (   .500 LB/MMBTU)
                                                  420.0
                                                  400.0
                                               *******
                                                  420.0
                                               COMBUSTION  ENGINEERING
                                               PULV  COAL,  BALANCED DRAFTt TANGENTIAL FIRED
                                               CYCLIC
                                                0/71
                                                  599.78        (1271000 ACFM)
                                                  14f».9         t 300 F>
                                                  11*.          < 375 FT)
                                               *******         (***** FT)
                                               COAL
                                               * *****
                                                 21260.
******
***** ***
***** *
     .55
****** •
     .03
******
  136.0
  400
                ( 10000 BTU/LB)
                * *****
                                                               (150 TPH)
                                                 RECTANGULAR VARIABLE THROAT
                                                 COMBUSTION ENGINEERING
                                                     1
                                                 316L SS APPROACH AND THROAT
                                                 316L SS RODS
                                                 NON-ATOMIZING,
                                                    50.0
                                                   299.7
                                                   148.9
                                                   655.2
                                                     2.1
                                                     2.2
                                                      .748
                FAN TYPE  SPRAY

                t  635000  ACFM)
                (  300  F)
                (1C400  GPM)
                (16.0 GAL/1000ACF)
                (    9  IN-HJO)
                                                 THROUAUAY PRODUCT
                                                 WET SCRUBBING
                                                 LIMESTONE
                                                 COMBUSTION ENGINEERING
                                                 FULL-SCALE
                                                 RETROFIT
                                            - X     98.90
                                                    52.00
                                                 11/71
                                                 VERTICAL COUNTERCURRENT SPRAY
                                                  4/78
                                                 COMgUSTION ENGINEERING
                                                     1
                                                 316L SS
                                                 HEADERS FRP, NOZZLES CERAMIC
                                                    1*
                                               143

-------
FPA UTILITY FfcD SURVEY:  DECEMBER 197£  -  JANUARY 1979
                                              SECTION 3
                      DtSIGN AND PERFORKAKCE  DATA FOP OPERATIONAL FED SYSTEMS
      BOILER LOAD/AFSORPER  - X
      6AS FLOW - CU.M/S
      6AS TFMPfcRATURE  -  C
      LIttUID RcClRCULATION  RATE - LITfR/S
      L/6 RATIO  - L/CU.M
      PRESSURE DROP  -  KPA
      PARTICULATE REMOVAL EFFICIENCY  -  *
      S02 OUTLET COK'TRATJON - PPf
      S02 DESIGN REMOVAL EFFICIENCY - X

     FANS
      NUMBER

     "1ST ELIMINATOR
      MUMPER
      TYPE
      CONSTRUCTION  MATERIAL
      CONFIGURATION
      WASH SYSTEM
   5P.O
  25ft. 71
   52.2
  655.
   98.9
  35?
   52.0
< 5*4000 ACFM)
<  126 F>
(1C400 SP(n)
< 19.0 6AL/10DOACF)
( 2.5 IN-H20)
CHEVRON
FRP
HORIZONTAL
INTERMITTENT,  HIGH PRESSURE  WATER WASH  DIRECTED
  ** WIST El ICIINATOR
      NUHPER
      TYPE
      CONSTRUCTION  MATERIAL
      WASH SYSTEM
BULK ENTRAINMENT SEPARATOR
FRP
INTERMITTENT,  HIGH PRESSURE  WATER WASH  DIRECTED
  ** PROCESS CONTROL CHEMISTRY
      CONTROL  VARIABLES
      CONTROL  RANGE
      CONTROL  MANNER
      WODF
      SENSOR LOCATION
SO?, SLURRY  FLOWS, PH, X  SOLIDS, PRESSURE  CHANCE
PH=5.5-5.7
AUTOMATIC
FEEDBACK
PH PROBES  IN REACTION TANKS
  ** PUMPS
      SERVICE
      REACTION-RECYCLE TANK BLEF.D
      RECYCLE
      SLURRY  FEED  PUMPS (SCREW TYPE)
      SLURRY  FEED  PUMPS {SCREW TYPE)  (SP/R
      MIST ELIMINATOR WASH PUMPS
      MILL SLURRY  PUMP
      MILL SLURRY  PUMP (SPARE)
      CLASSIFICATION TANK TRANSFER  PUI»P
      CLASSIFICATION TANK TRANSFER  PUMP  
-------
                                               EPA UTILITY FGD SURVEY:  DECFKBER 1978  -  JANUARY 1979
                                             SECTION 3
                    DESIGN AND PERFORMANCE  DATA FOR OPERATIONAL  FGD SYSTEMS
 **  DISPOSAL
     NATURE
     TYPE
     LOCATION
     TRANSPORTATION
     AREA - ACRES

 **  DISPOSAL
     NATURE
     TYPE
     LOCATION
     TRANSPORTATION
     AREA - ACRES
                                          FINAL
                                          UNLINEO  POND
                                          ON-SlTE
                                          OVERFLOy FRO* INTERIM SLUDGE  POND
                                              4.0
                                          FINAL
                                          UNLINED  POND
                                          ON-SITE
                                          OVERFLOW fPGK INTERIM SLUDGE  POND
                                              2R.O
	PERFORMANCE  DATA	
PERIOD MODULE  AVAILABILITY CPERASILITV  RELIABILITY UTILIZATION   X  REMOVAL   PER  BOILER   FGD    CAP-
                                                                   S02  PART. HOURS HOURS  HOURS  FACTOR
 7/75  SYSTEM
 8/75

 9/75
                                                                         744
       **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   7/75      E6U1FKENT: BOILER-RELATED
              END DATE     8/75      COMMENTS:
                           OIL AND  GAS  WrRE IN JULY AND  AUGUST,  RESULTING IN NO  FED OPERATION-
              AFFECTED MODULES;  SYSTEM
SYSTEM

SYSTEM
744

7?0
        **  PR08LEMS/SOLUTIONS/COMMENTS
              START DATE   9/75      ESUIFKENT: BOILER-RELATED
              END DATE     10/75      COtfMtNTS:
                           GAS  AND  OIL WTPE BURNED ON  A  PART  TIME BASIS DURING SEPTEMBER  AND  OCTOBER.
                           BOILER  OUTAGE WAS DUE TO INSPECTION AND TURBINE REPAIR.
              AFFECTED MODULES:  SYSTEP
 10/75

 11/75
 12/75

  1/76

  2/76
           PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    9/75      E8UIH*ENT: RECYCLE  TANK
              END DATE     10/75      PROBlFHt CHEMICAL-RELATED PLUGGING
                            ADDITIONAL BOILER OUTAGE  WAS DUE  TO REPLACEMENT OF THE  SLURRY  TANK ECREENi
              AFFECTED MODULES:  SYSTEM
SYSTEM

SYSTEM
744

720
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   11/75     E6UIPWENT:
              END DATE      1/76     COMMENTS:
                            PROJECTIONS Fit UTILITY  FOR  THIS llMT CALL FOR DAYS  OF  OPERATION IN
                            1976 WITH FUEt CONSUMPTION  BEING 60 PERCENT COAL,  25  PERCENT FUEL OIL. AND
                            15 PERCENT GAS.
              AFFECTED MODULES: SYSTEM

        ** PROeLEMS/SOLUTIONS/COMMENTS
              START DATE   11/75     EOUIFt-ENT:  FGD  SYSTEM, GENERAL
              END DATE      1/75     COMM ENTS:
                            LIKE UNIT 4 TUS UNIT MAY PE CONVERTED TO A VENTR1-ROD AND SPRAY TOWER
                            SCRUBBING SYSTEM.
              AFFECTED MODULES: SYSTEM
SYSTEM

SYSTEM

SYSTEM

** PROBLEMS/SOLUTIONS/COMMENTS
       START DATE   2/76      EGUItKENTj FGD SYSTf".  GENERAL
       END DATE     9/76      COMMENTS:
 744

 744

 696
                                                  145

-------
FP» UTILITY FbD SURVEY: DECtWtFR  1«7fl  -  JANUARY 1979
                                            SECTION  3
                     OESI6N  AKD  PERFORMANCE  OAT* FOR OPERATIONAL F6D SVSTFMS
                   _ .......... _            -PERFORMANCE  6 AT A ------------------------ I 7^1
PERIOD MODULt  AVAUABUITY  CPEMBIim  PLIABILITY UTILIZATION    ""OV*         .OltER
                           NO INFORMATION HAS IMPORTED BY THE UTILITY FOR THE PERIOD.
              AFFECTED  MODULES:  SYSTEM

  3/76   S*STEK                                                                 7**

  4/76   SYSTEK                                                                 7?0

  5/76   SYSTEM                                                                 7*4

  6/76   SYSTEM                                                                 72°

  7/76   SYSTEM                                                                 7**

  8/76   SYSTEM                                                                 7**

  9/76   SYSTEM                                                                 720

 10/76   SYSTEM                                                                 744

        **  PROBLEMS/SOLUT10NS/COMNEN1S
              START  DATE   10/76      E OUI 1'^ENT:  F6C SYSTfHt GENERAL
              END DATE     12/76      CCKFTK'TS:
                           THE FCILER  FlfFS NO. 2 FUEL OIL IN ADDITION TO LOW SULFUR WYOMING  COAL
                           bHILF THE NEW  SCRUBBING FACILITIES ARE BEING INSTALLED. THE ORIGINAL
                           INJECTION AND  TAIL-END SCRUBBING SYSTEM IS STILL AVAILABLE  FOR  SERVICE
                           AftD OPERATED  hHEN THE INIT FIRES COAL. THE SYSTEM WILL TREAT  FLUE  6AS
                           RESULTING FROP THE BURNING OF LOU SULFUR (0.5 PERCENT) WYOMING  COAL.
              AFFECTED  MODULES:  SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   10/76      EfiUIFMENT:  F6D SYSTEM, GENERAL
              END DATE     U/76      CCMMfNTSS
                           THE UTILITY  Rl-PORTS  THAT THE INSTALLATION OF THE NEki ROD  AND  SPRAy TOUER
                           SCRUPtlNG SYS KM IS  NOW IN PROGEESS. THE SYSTEM WILL CONSIST  OF  TWO SCRUB-
                           BING  TRAINS  EACH HANDLING SO PERCENT OF THE FLUE 6AS CAPACITY.  FOUNDATION
                           AMD STRUCTURAL STEEL ERECTION HAS BEEN COMPLETED, AN6 SOME  OF THE  BRFECHIN
                           HAS BEEN INSTILLED.  THE F6D WILL OPERATE IN A FULLY AUTOMATIC BASIS.
              AFFECTED  MODULES:  SYSTEM

        **  PftOBLEMS/'SoLOTIONS/COHMENTS
              START  DATE   10/76      £OUII«ENT:  PROCESS CONTROL
              END DATE     12/76      PROBttM: NOT DEFINED/SPECIFIED
                           KPSL  REPORTED  THAT C-E HAS ENCOUNTERED SOME PROBLEMS WORKING  OUT AND  FINE
                           TUNING SOfF  Of THE LOGIC CIRCUITS.
              AFFECTED  MODULES:  SYSTEM

 11/76   SYSTEM                                                                 720

 12/76   SYSTEM                                                                 m

        **  PROtiLEMS/SOLUTIONS/COMMENTS
              START  DATE    1/77      E8UIFMENTJ  F60 SYSTEM, GENERAL
              tND DATE      5/77      COMMENTS:
                           KPSL  REPORTbD  THAT CONSTRUCTION OF THE NEW SCRUBBING SYSTEM IS  STILL  IN
                           PS06RESS. ALL  FOUNDATION WORK HAS BEEN COMPLETED AND THE  ERECTION  OF  THE
                           STRUCTURAL  STFEL AND BREECHING IS CONTINUING. THE MODULES ARE NOW  BEING
                           ESECTED AT  THE PLANT SITE, PARALLEL TO THE EXISTING MARBLE-BED  SYSTEM.
              AFFECTED  MODULES:  SYSTEM

  1/77   SYSTEM                                                                 744

  2/77   SYSTEM                                                                 672

  3/77   SYSTEM                                                                 744

  4/77   SYSTEM                                                                 720

  5/77   SYSTEM                                                                 744



                                                146

-------
                                              EPA UTILITY  FGD  SURVEY:  DECEMBER 1978 - JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PERFORMAf-CE DATA FOR OPERATIONAL  FED  SYSTEMS
..............	,	--PERFORMANCE  DATA	—	
PERIOD MODULE AVAILABILITY OPERABILITY SELIABILITY UTILIZATION   X  REMOVAL    PER  BOILER  FGD   CAP.
                                                                  SC2   PART.  HOURS HOURS  HOURS FACTOR


 6/77  SYSTEM                                                                  72Q

       ** PROfaLEMS/SOLUTlONS/CCMKENTS
              START  DATE    6/77     EQUIPMENT:  F6D  SYSTEM,  GENERAL
              END  DATE      7/77     COhMCNTS:
                           OPERATION OF THE EXISTING MARBLE  BED  SCRUBBERS  HAS BEEN 8UITE SATISFACTORY
                           AKD NEARLY PROBLEM FREE. THE CONNECTING  DUCTWORK  IS CURRENTLY BEING INSTAL
                           LED AS CONSTRICTION  CONTINUES.  THE  TWO PARALLEL  SCRUBBING MODULES, EACH
                           DESIGNED TO HANDLE ZOO MW OF GENERATING  CAPACITY  ARE INSTALLED, AS ARE
                           ThE REHEATER TUBE BUNDLES.  THE  EXISTING  MARBLE  BED SCRUBBERS WILL BE
                           REMOVED WHEN 1HE NEW  SCRUBBING  SYSTEM IS READY  FOR S02 REMOVAL OPERATIONS.
              AFFECTED  MODULES: SYSTEM

  7/77  SYSTEM                                                                  744

  8/77  SYSTEM                                                                  744

  9/77  SYSTEM                                                                  720

       **  PROBLEMS/SOLUT10NS/CCMMENTS
              START  DATE   9/77     E6UIHUNT:  F6D  SYSTEM,  GENERAL
              END DATE     9/77     CCMMlNTSl
                           TK CONSTRUCTION ON  THE  NEW SCRUPBER  PLANT  IS CONTINUING ACCORDING TO
                           SCHEDULE AMD  IS EXPECTED TO BE  SCMPLETF,  BY  APRIL  1978. KP&L INDICATED
                           THAT MORE DETAILED INFORMATION  WOULD  BE  AVAILABLE FOR THE NEXT REPORT.
              AFFECTED MODULES: SYSTEM

 10/77   SYSTEM                                                                 ?44

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   10/77     tOUHCENT:  F66  SYSTEM,  GENERAL
              END DATE     11;77     COMMFNTS:
                           TfcE SYSTEM  OPERATED  UNDER NORMAL CONDITIONS THROUGHOUT OCTOBER AND NOVEMBE
                           WITH NO  PROBLtWS.
              AFFECTED HODULfcS: SYSTEM

 11/77  SYSTEM                                                                 720

 1?/77  SYSTEM                                                                 744

        **  PROBLEMS/SOLUTIONS/COMHENTS
              START DATE   12/77     EQUIPMENT:  FGD  SYSTEM,  GENERAL
              END DATE     1/78     COWMtNTS:
                           THE  CONSTRUCTION  OF  TEO  VENTRI-ROB SCRUBBERS IS NOW COMPLETE. THE INLET
                           DUCTWORK IS  BUNS  INSTALLED, AND THE  OUTLET DECT WORK WILL BE  INSTALLED
                           ALON6  WITH  ADUT10NAL CONTROLS DURING THE SCHEDULED OUTA6E  IN APRIL 1978,
                           HTE PRESENT  Fit  SYSTEM OPERATED WITHOUT AMY PROBLEMS.
              AFFECTED MODULES:  SYSTEM

  1/78  SYSTEM                                                                 744

  2/78  SYSTEM                                                                 '72

        **  PR06LEMS/SOLUTIONS/COMMENTS
              START DATE   2/76     EOUI^ENT:  FGD  SYSTEM, GENERAL
              END DATS     3/78     CCMMtNTSs
                           THE  CRI6IMAL  FtD  SYSTEM  WAS PULLED OFF  LINE ON MARCH  20  SO  THAT  THE NEW
                           5CRUBBER-A6SOUSIR SYSTEM COULD BE TUB  INTO THE 6AS  PATH. THES NEW  SKSTEH
                           CONSISTS Of  T*0  MODULES  IACH WITH A  ROB SCCTION FOR  PARTICULAR  REMOVAL
                           AMD  A  SPRAY TtWIER FOR SO? REMOVAL. THE  CAPACITY IS  210  MW IACH KODULf.
                           IhlTAL OPERATION  SHOULD  BEGIN BY THE  FIRST OF MAT.
              AFFECTED MODULES:  SYSTEM

  5/78  SYSTEM                                                                  7«4

  4/7B  SYSTEM                                                                  720
                                                 147

-------
FP» UTILITY  FGD  SURVEY:  DECIMPER 197f - JANUARY
                                            SECTION  3
                     OlSltN AND PERFORMKE DATA FOR OPERATIONAL  F6D SYSTEMS
------------------------------------------ p£K FORMANCf DATA
PERIOD MODULE AVAILABILITY  CPERABILJTY ,rLJAHILITY UTILISATION
                                                                                   BOILER
 5/7P

 6/78
        **  PRO&LEMS/SOLUTIONS/COMMENTS
              START DATE   
-------
                                             EPA  UTILITY FGD SURVEY: DECEMBER 1978 - JANUARY 1979
                                           SECTION  3
                   DtSIGN  AND  PERFORMANCE  DATA  FOR OPERATIONAL FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
RE6ULATORY CLASSIFICATION
PARTKULATE EMISSION LIMITATION  -  MC/J
502 EMISSION LIMITATION  -  NG/J
NET PLANT GENERATING CAPACITY  -  MM
GROSS UNIT GENERATING  CAPACITY - HW
NET UNIT GENERATING  CAPACITY  U/F6D - Mt
NET UNIT GENERATING  CAPACITY  UO/FGI) - fU
EQUIVALENT SCRUBBED  CAPACITY  - KU

** BOILER DATA
    SUPPLIER
    TYPE
    SERVICE LOAD
    COMMERCIAL  SERVICE DATE
    MAXIMUM BOILER  FLUE  GAS FLOW - CU.K/S
    FLUE  GAS TEMPERATURE - C
    STACK HEIGHT  -  M
    STACK TOP  DIAMETER - M
               (  .097 LP/MMRTU)
               < 1.670 LP/MMBTU)
KENTUCKY
GREEN R1VEP
1-3
CENTRAL CITY
KENTUCKY
C
   42.
  718.
*******
   64.0
   60.0
   62.0
   64.0
BAPCOCK AND UILCOX
DRV BOTTOM, PULVERIZED COAL
PEAK
 0/50
               ( 360000 ACFH)
               ( 300 F>
  16^.88
  HP.9
   SO.
 **  FUEL  DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT CONTENT - KJ/KG
     RANGE HEAT CONTENT - RTU/LB
     AVERAGE ASH CONTENT - I
     RANGE ASH  CONTENT - X
     AVERAGE MOISTURE CONTfhT - X
     RANGE MOISTURE CONTENT - X
     AVERAGE SULFUR CONTENT - X
     RANGE SULFUR CONTENT - X
     AVERAGE CHLORIDE CONTENT - X
     RANGE CHLORIDE CONTENT - X
     FUEL FIRING RATE - M T/H
     FUEL FIRING RATE - MW

 ** MECHANICAL COLLECTOR
     TYpE
     SUPPLIER
     PARTICIPATE DESIGN REMCVAL EFFICIEfCV - 1
     FLUE GAS CAPACITY - CU .M/S
     PRESSURE DROP - KPA

 ** PARTICULATE SCRUBBER
     NUMBER
     TYPE
     SUPPLIER
     NUMBER OF STAGES
     SHELL MATERIAL
     LINING MATERIAL
     INTERNAL MATERIAL
     TYPE OF NOZZLES
     BOILER LOAD/SCRUBBER  - X
     FLUE GAS CAPACITY - CU.M/S
     FLUE GAS TEMPERATURE  - C
     LIQUID RECIRCULATION  RATE - LITER/S
     L/C  RATIO - LITER/CU.M
     PRESSURE DROP - KPA
     PARTlCUtATE INLET LOAD -  G/CU.M
     S02  INLET CONCENTRATION - PPM

 ** FGD  SYSTEM
     SALEABLE PRODUCT/THROW AWAY  PRODUCT
     GENERAL PROCESS TYPE
     PROCESS TYPE
     SYSTEM SUPPLIER
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     PARTICULATE DESIGN  REMCVAL  EFFICIEKY  -  X
     S02  DESIGN REMOVAL  EFFICIENCY  -  X
     COMMERCIAL DATE
     INITIAL START-UP
COAL
BITUMINOUS
 255S6.

   13.40
******
   12.10
******
    4.00
******
********
******
*******
*****
                ( 165 FT)
                ( 16.0 FT)
                (  11000 8TU/LB)
                ******
                (***  TPH)
CYCLONES
WESTERN PRECIPITATION
   85.0
   49.5         <  105000 AC?M)
      .5         (    2  IN-H20)
  1
 VARIABLE  THROAT  VENTURl
 AMERICAN  AIR  FILTER
     1
 MILD  STEEL
 ACID  PROOF  PRECRETE
 STAINLESS  STEEL  THROAT
 SPINNER VANE
   100.0
   136.0         ( 288200  ACFH)
    52.2         t  12*  f>
    85.7         ( 1360  6P«>
     4.6         (34.5  6AL/1000ACF)
     1.7         t    7  IN-H20)
     5.0         (  2.?0  6R/SCF)
  2200.000
 THROWAWAY  PRODUCT
 WET SCRUBBING
 LIM£
 AMERICAN AIR FILTER
 FULL-SCALE
 RETROFIT
    99.50
    80.00
  6/76
  9/75
                                                149

-------
FPA UTILITY  FGD  SURVEY:  fEClPBER 197F - JANUARY  1979
                                             SECTION  3
                     DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL FGD SYSTEMS
      CONSTRUCTION  INITIATION
      CONTRACT  AWARDED

  • *  ABSORBS R
      NUMPER
      TYPE
      INITIAL START UP
      SUPPLIER
      NUMBER  OF STAGES
      DIMENS IONS
      SHELL MATERIAL
      SHELL LINER MATERIAL
      eOILEP  LOAD/APSORBER - X
      GAS FLO*  - CU.M/S
      GAS TEMPfcRATUSE - C
      LIQUID  PiClRCULATIGM RATE  - LITER/S
      L/E RATIO - l/CU.M
      PRESSURE  DROP - KPA
      SUPERFKAL 6AE VELOCITY -  M/SEC
      PARTICULATE OUTLET LOAD- 6/CU.f,
      S02 OUTLET CONTRAT10N  - PPM

  ••  FANS
      CONSTRUCTION MATERIALS

  ** MIST ELIMINATOR
      NUMPE*
      TYPE
      CONSTRUCTION MATERIAL
      CONFIGURATION
      NUMPER OF STAGES
      NUMBER OF PASSES
      FREEBOARD DISTANCE - M
      DEPTH - M
      WASH SYSTEM
      SUPERFICIAL GAS VELOCITY  -  M/S
      PRESSURE DROP - KPA
 4/74
 6/73
MOBILE BEO CONTACTOR
 9/75
AMERICAN AIR FILTER
    1
20X20X27.5
MILD STEfL
ACID PROOF REFRACTORY
  10(1.0-
  136.00
   57.2
  *14.
    4.S
    1.0
    4.3
     .1
  400
                ( 288?00 ACFM)
                (  126  F>
                ( 9750  GpW)
                < 34.0  6AL/1000ACF)
                ( 4.0  IN-H20)
                { 14.0  FT/S)
                (  .044 6R/SCF)
                                                  bOILFR ID BOOSTER  FAN
                                                  MILD STEEL
RADIAL VANE
STAINLESS  STEEC  VANES
HORIZONTAL
    1
    1
    P.38
     .91
                (27.5  FT>
                <  3.0  FT)
OUTWARD SPRAY AT  50 6PM,  CONTINUOUS
    7.6         t  25.0  FT/S)
     .5         C  2.0  IN-H20)
     PROCESS CONTROL  CHEMISTRY
      CONTROL VARIABLES
      CONTROL RANGE
      SENSOR LOCATION
S02, SAS  FLOW  PRESSURE DROP* P«» PERCENT SOLIDS
PH-5 TO 8.5;  10% SOLIDS IN RECYCLE
PH-RFACTANT TANK;  DENSITY METERS-RECYCLE LINE
  *« PUMPS
      SERVICE
      RECYCLE
      REClRCUlATlfiN
      RECIRCULATION  (SPARE)
      SLURRY TRANSFER
      POND VATER RETURN
      BLEED STREAM

     TANKS
      SERVICE
      SLAKING  TANK  (SPARE)
      SLAKED SLURRY  DILUTION/HOLDING TANK
      REACTION/RECYCLE
      SLAKIN6  TANK

  ** REHEATER
      TYpF
      NEATIN6  HEoIUM
      TEMPERATURE BOOST  -  C

  ** WATER LOOP
      TYPE
      FRESH MAKEUP  WATER ADDITION - LITFRS/S

  *• DISPOSAL
      NATURE
      TYPE
NUMBER

   4
   2
   1
   2
   2
   2
MUMBFR

    1
****
    1
    1
 IN-LINE
 STEAM
    27.S
 CLOSED
     4.7
 FINAL
 LINED POND
                    50 F)
                (   75 6PM)
                                                  150

-------
                                               EPA UTILITY FGO SURVEYS  DECEMBER 1976 - JANUARY 1P79
                                             SECTION 3
                     DESIGN AND PERFORM AKE  DATA FOR OPERATIONAL  F60  SYSTEMS
     LOCATION
     TRANSPORTATION
     AREA -  ACRES
     CAPACITY  - CU.H
                 ON-SITE
                 PIPE
                     7.4
                     203629
                                                                  (    166.5  ACRE-FT)
	PERFORMANCE DATA--	•	—	....	
PERIOD MO'OULE  AVAILABILITY OPERABIL1TY  IFL1ABILITY UTILIZATION  X  REMOVAL    PER  BOILER  F6D   CAP.
                                                                  S02   PART.  HOURS HOURS  HOURS FACTOR
 9/75   'SYSTEM
                                                                                720
        **  PROtlLtMS/SOLUTJONS/COMMENTS
              START DATE    9/75      IGUIFKENT: F6D SYSTEM. GENERAL
              END DATF      1/76      COfiMlNTS:
                            THE  SYSTEM BECAME OPERATIONAL SEPTEMBER  13,  1975  ON A HALF-LOAD BASIS
                            BECAUSE  OF TUttilNE OVERHAUL.  LfcGtlNG  OF  OPERATING DATA BEGAN DECEMBER
                            1575.
              AFFECTED MODULES:  SYSTEM
10/75 SYSTEM
11/75 SYSTEM
1 2/75 SYSTEM
1/76 SYSTEM


74.0
42.0


65.0
11.0


76.0
14.0


35.0
9.0
                                                                                744

                                                                                720

                                                                                744

                                                                                744
                                                     398
                                   257

                                   £40
        ** PRQBLEMS/SOLUTIONS/COMMEN1S
              START  DATE    1/76     ESl/I fMENT: RECYCLE  PUMP
              END DATE      1/76     PROBIFM: NOT D E FINED /SPE Cl F 1 ED
                            A  MAJOR PKCBLiM WAS FAILURE  OF  THE  RECYCLE  PUMPS.
              AFFECTED  MODULES: SYSTEM

        •» PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    1/76     EQUITttENT: PIPING
              END DATE      1/76     PROBLEM: WEATHER-RELATED  COMPONENT FAILURE
                            THAWING AND RfcPAIH OF NUMEROUS  FROZEN  LINES WAS REQUIRED.
              AFFECTED  MODULES: SYSTEM

        *• PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    1/76     EfiUIfMENT: PUMP, OTHER
              END DATE      1/76     PFOPUM: NOT DEFINED/SPECIFIED
                            SHUTDOWN OF SIMP PUMPS WAS  NECESSARY.
              AfffcTfo  MODULES: SYSTEM

        ** PRObLEMS/SOLUTIONS/COMMENTS
              START  DATE    1/76     16UIFMENT: TANK, OTHER
              tND DATE      1/76     PFOeifM: NOT DEFINED/SPECIFIED
                            A  MAJOR PROtiLtM AREA WAS  THE FEED  TANK AGITATOR.
              AFFECTED  MODULES: SYSTEM
  2/76  SYSTEM
                     70.0
                                 42.0
                                             42.0
                                                          30.0
                                               696
                                                                                             211
        ** PROtiLEMS/SOLUTIONS/COMMENTS
               START  DATE    2/76     EOUI FfENT:  TANK,  OTHER
               END  DATE      2/76     FROBIEM: NOT  DEFINED/SPECIFI ED
                            REPAIRS WERE  MDE TO THE TANK  A6I1ATORS, SLAKE TANKS AND MIX-HOLD TANKS
                            CONTRIBUTING  10  OUTA6E  TIMF.
               AFFECTED  MODULES: SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTE
               START  DATE    2/76     tOUIfMENT:  RECYCLE  PUMP
               END  DATE      2/76     PPOBIFM: NOT  DEFINED/SPECIFIED
                            REPAIRS AND CtEANOUT OF  REACTANT PUHPS CONTRIBUTATED TO OUTAGE  TIME.
               AFFECTED  MODULES: SYSTEM
  3/76  SYSTEM
                     97.0
85.0
                                              95.0
52.0
                                                                                 744
                                                                                              386
        **  PROBLEMS/SOLUTIONS/COMMENTS
               START DATE   3/76     EOUIFMENT:  PUMP, OTHER
               END DATE     3/76     PROBLEM:  NOT DEFINED/SPECIFIED
                                                  151

-------
EPA UTILITY  fbO  SURVEY: DECEMBER 1"57f.  -  JANUARY 1979
                                             SECTION 3
                     DESIGN AND PERFORMANCE  DATA FOR OPERATIONAL F6D  SYSTEMS
	PERFORMANCE DATA	     ..   -,_
PERIOD  MODULE  AVAILABILITY CAPABILITY  ^UAtlLITY UTILISATION  »o«"™|^ ^ B011ER ^FGD^ ^.^


                           ALL  RUBBEfc-LIftD  IMPELLERS WERE REPLACED  IN  THE  PUMPS.
              AFFECTED MODULES:  SYSTfcM
4/76
5/76
6/76
7/76
8/76
SYSTEM-
SYSTEM
SYSTEC
SYSTEM
SYSTEM
90
81
10P
90
97
.0
.0
.0
.0
.0
100
1CO
99
98
97
.0
.0
.0
.0
.0
100
100
99
99
97
.0
.0
.0
.0
.0
77
61
82
7?
97
.0
.0
.0
.C
.0
 10/76

 11/76
 12/76

  1/77
  2/77
                                                                        720

                                                                        744

                                                                        720

                                                                        744

                                                                        744
                                                                                      744
                                                                                              4i>6



                                                                                              574

                                                                                              722
           PROBLEMS/SO LOTION 5/COMMENTS
              START DATE   8/76      EfiUjfKENT: FAN
              END DATE     8/76      FROBLtM: DESIGN-RELATED VIBRATION
                           VIBRATION IN  1HE  SCRUBBER BOOSTER I.D.  FAN  NECESSITATED SYSTEM  SHUTDOWN'
                           AND REPAIR.
              AFFECTED MODULES:  SYSTEM
  9/76  SYSTEM
                    86.0
                                100.0
                                            100.0
                                                         79.0
                                                                                720
                                                                                              571
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    9/76      EQUIPMENT: FAN
              END DATE      9/76      PROP IFM r NOT D EFIN ED/S PE CI FI ED
                            MINOR  FAN F>ROfLEMS OCCURRED BUT NO  FORCED  OUTAGE TIME WAS REQUIRED.
              AFFECTED MODULES:  SYSTEM

        ** PR06LEMS/SOLUT10NS/COMMENTS
              START DATE    9/76      EOUIfWENT: BOIL ER-RELA TF D
              END DATE      9/76      FROBIEM: NOT DEFINED/SPECIFIED
                            HALF-LOAD OPEhATIONS WERE CONDUCTED  THROUGHOUT THE PERIOD BECAUSE  OF
                            BEARING  PRCBLfMS TO ONE OF THE TWO  TURBINE GENERATING UNITS.
              AFFECTED MODULES:  SYSTEM
SYSTEM

SYSTEM
100.0

100.0
100.0

1CO.O
100.0

 98.0
94. C

98.0
744

7?0
699

7Ci4
           PROBLB»S/«OLUTION?/CeMMENrS
              START DATE   11/76      £8UIF«ENT: ABSORBER
              END DATE     12/76      COMMENTS:
                            DURING  NOVEMBff? AND DECEMBER, 1974  SOME  FLUE 6A S WAS BY-PASSED  AROUND
                            THE  SYSTEM WHILE THE UTILITY CONDUCTED A CHECKOUT OF THE  SCRUBBER INTERNAL
                            ADD  REPLACED fOME OF THE PACKING  SPHERES IN THE MOBILE BED.
              AFFECTED MODULES:  SYSTEM
SYSTEM

SYSTEM
 73.0

 94.0
 97.0

 94.0
 87.0

 94.0
70.0

94.0
744

744
                                                                                       744
517

698
        •* PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    1/77      E6UIFMENT: ABSORBER
              END DATE      1/77      PROBLEM: MECHANICAL-RELATED  COMPONENT FAILURE
                            T»,E  SCRUBBER MS RELINED WITH PRFCRETE, REPLACINC THE ORIGINAL
                            "CARBOL1NE" WHCH SHOWED EXCESSIVE FLAKING
              AFFECTED MODULES:  SYSTEM
        *• PROBLEMS/SOLUTIONS/COMNENTS
              START DATE    1/77      ECUIFMENT: STACK
              END DATE      1/77      PROBlE«: NOT DEFINED/SPECIFIED
                            THE  STACK WAS REL1NED WITH
              AFFECTED MODULES!  SYSTEM
            36.0
                                 91.0
                                             91.0
                                                          36.0
                                                                         672    266
                                                                           243
        *•  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    ?/77      EODIFMENT: STACK
              END DATE      3/77      PROP LEU: DESIGN-RELATED INFERIOR CONSTRUCTION MATERIAL
                                                 152

-------
                                              EPA  UTILITY FGD SURVEY: DECEMBER 1978 - JANUARY 1979
                                             SECTION  3
                     DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL FED SYSTEMS
---- ........ --- . ------------------- _ ------- PERFORMANCE  DATA ------------------------------------------
PERIOD MOOULF AVAILABILITY CAPABILITY  PLIABILITY  UTILIZATION  X REMOVAL   PER  60ILER  FGD   CAP.
                                                                  SC2  PART. HOURS HOURS  HOURS  FACTOR

                           DURllNG THt MO*TH  OF  FEBRUARY JT  WAS FOUND THAT THE CARBOLINE STACK LINER
                           WAS BADLY CfcT tR 1 ORA T ED.   SCRUBBER AND BOILER OPERATIONS WERE TERMINATED
                           UtiTIkVL THE STUCK  LINING  IS REPAIRED.  THE STACK WAS REPAIRED FIRST BY
                           WELDING A BACKUP  METAL  PLATE TO  THF PORTIONS OF THE STACK WHERE PITTING
                           OCCURRED.  THE  ENTIRE STACK  WAS  THEN LINED WITH REFRACTORY COATING CALLED
                           PRECRl-TE t-F  hY AAF .   THE REPAIRS WERE COMPLETED MARCH 7.
              AFFECTED MODULES: SYSTEC

        **  PROBLEMS/SOLUTION S/COK1£N7S
              START DATE   2/77     EQUIPMENT:  F6D  SYSTEM,  GENERAL
              END  DATE     2/77     CCMNjNTS:
                           IK BOILER IS NOT OPERATED WITHOUT THE SCRUBBER BECAUSE THERE IS NO  ESP
                           FOR PARTI'CULAIF  CONTROL.
              AFFECTED MODULES: SYSTEM
3/77 SYSTEM
4/77 SYSTEM
5/77 SYSTEM
6/77 SYSTEM

40.0
99.0
100.0

98. 0
98.0
100.0

98.0
98.0
100.0

23.0
69.0
5.C
 6/77

 9/77

10/77

11/77
                                                           7*4

                                                           720

                                                           7*4

                                                           720
                                        167

                                        527

                                        3*0
                                                                                            164

                                                                                            513

                                                                                            3*0
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/77      EQUIPMENT: SCRUBBER
              END DATE     6/77      PRCBllB.M: NOT DEFINED/SPECIFIED
                           WORK  ON THE  SCMUBBER MODULF CONCERNS REPAIRS TO THE UNDER6FD  DAMPER  SYSTEM
                           AND LEAKING  IK  THE VENTURI.
              AFFECTED MODULES:  SYSTEM

        ** PROetEMS/SOLUTIONS/COMMENTS
              START DATE   6/77      (OUIFMEKtT: REAGENT HANDLING
              END DATE     6/77      PPOBIFM: NOT DEFINED/SPECIFIED
                           LIME  SLAKING OPERATIONS WAS REPAIRED.
              AFFECTED MODULES:  SYSTtd
  7/77  SYSTEM
                                                                                744
        •* PROBLEMS/SOLUTIONS/COMMENTS
              »TA*T DATE    7/77      teUI^MENT:  F6D SYSTEM, GfcKTEHAL
              END DATE     11/77      COMMENTS:
                            A  STRIKE  It  PLANT OPERATING PERSONNEL  RESULTED  IN  BOILER  AND  FGD  SYSTEM
                            SHUTDOWN.
              AFFECTED MODULES:  SYSTEM
SYSTEM

SYSTEM

SYSTEM

SYSTEM
86.0
                                 91.0
91.0
                                                          *1«0
                                   7*4

                                   720

                                   74*

                                   720
                                                                                      332
                                                                                             J01
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   11/77      EOUIfMENT: RECYCLE PUMP
              END DATE     12/77      PROPLEM: NOT DEFINED/SPECIFIED
                            PROBLEMS WERE ENCOUNTERED HITH  LEAKS  IN  RECYCLE  PUMP IMPELLER COATINGS
                            AND  PUMP FAILtWES.  TWO PUMPS WERE  DOWN  AND  BEING BYPASSED.
              AFFECTED  MODULES:  SYSTEM

        ** PROBLEMS/SOLUTI ONS/COHMENTS
              START  DATE   11/77      EQUIPMENT: PIPING
              END DATE      2/78      PROBIEM: WE ATHER-REL ATED  COMPONENT  FAILURE
                            DUE  TO THfc VEfY COLD HEATHER NUMEROUS FREEzE-UPS OCCURED INCLUDING THE
                            SLURRY LINE TC THE POND CAUSING FGD OUTAGE.
              AFFECTED  MODULES:  SYSTEM
                                                 153

-------
FPA UTILITY  f&O  SURVEY: DECEMBER  197f  - JANUARY 1979
                                             SF.CTJON 3
                     DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL FSD SYSTEMS
	PER FOR NANCE  DATA	
PERIOD  MODULE AVAILABILITY  OPERAP1L1TY PLIABILITY UTILI7AT10N   * REMO>/AL    PER  BOJ^"  FGD  r.rrno
                                                                   S02  PART.  HOURS HOURS   HOURS FACTOR
 12/77
        **  PR08LEMS/SOLUTIONS/CCMMENTS
              START DATE   11/77      E«UI>VENT: PUMP, OTHER
              END DATE     11/77      PROBIfcM: NOT DEF1NED/SPFCIFI ED
                            SLNP  PUMP FAILURES WERE NOTED.
              AFFECTED MODULES:  SYSTEM

        •«  PSOBLEMS/SOLUTIONS/COMMENTS
              START DATE   11/77      EflUItMENT: ABSORBER
              tND DATE     11/77      PROFJIC«: NOT DEFINED/SPECIFIED
                            LEAKS IN THE  FACKING WERE NOTED.
              AFFECTED MODULES:  SYSTtW
                    50.0
                                 63.0
                                             91.0
                                                  50.0
                                                                                 744
                                                                               596
                                                                                               175
           PRObL EMS/SOLUTIONS/COMMENTS
              START DATE   12/77      EGUIfKENT: FGD SYSTEM,  GENEFfAl
              END DATE      1 /7B      COM* tNTS:
                            Th£  SYSTEM COILD HAVE BEEN  CONSlDtRE.O AVAILABLE  THROUGHOUT MOST  OF  THE
                            PERIOD BUT BECAUSE EMERGENCY  CONDITIONS THF UTILITY CHOSE TO CONCENTRATE
                            THEIR  MAINTENANCE CREWS ON  POWER  GENERATION RATHER- THAN F6D OPERATION.
                            UNDER  NORMAL CONDITIONS THF RELATIVELY MNOR  FT, D SYSTEM PROBLEMS  fcOULD
                            HAVE  BEEN SOLVED MORE QUICKLY.
              AFFrCTED MODULES:  SYSTEM
                                 3?.0
                                             32.0
                                                  ZJ-.'O
                       744

                       672
      537

      672
                                                                                               170
  7/78

  8/78
                            2/78      £CU1 f'!»ENT: F6D  SYSTEdr GENERAL
                            4/78      PROBLEM: NOT DEFINED/SPFCIFIED  ,
                            DLRJN6 THt FRLfZE UP NUMEROUS  GASKETS WERE  TORN  THROU6HOUT THE  SYSTEM.
                            THE  SYSTEM fcAi SHUT DOWN COMPLETELY FOR  REPAIR  WORK.
3/78
4/7S
5/78
SYSTEM
SYSTEM
SYSTEM
100.0
41.0
64.0

99
100

.0
• 0

99
100

.0
.0

41
64

.0
.0
744
720
744
669
295
474

296
474
        •* PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    5/78     EftUI^PENT: PUMP,  OTHER
              END DATE      5/78     PROBLEM: PLUGGING, OTHER
                            The SCREENS o^ THE SUCTION SIDE OF THE  PUMPS  THAT PUHP THE  SLURRY FROM THE
                            PfitP ROOM TO THE NOZZLES  EXPERIENCED PLUGGING PROBLEMS. THE  SCREENS 6ET
                            PLUGGED WITH IARGE GRIT  IN THE SLURRY AND  ARE SUCKED OUT OF  POSITION BY
                            ThE PUWPS.  TKf UTILITY  REPORTED THAT THIS  TENDS TO BE A RE-OCCURRINS
                            PROBIEM.
              AFFECTED MODULES: SYSTEM
  6/78  SYSTEM
                     7J.O
                                100.0
                                            100.0
                                                          77.0
                                                                                 720
                                                                                        525
                                                                                               524
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    6/76     EdUIFfHENT:  f6D  SYSTEM, GENERAL
              END DATE      7/78     PROBLEM: NOT DEFINED/SPECIFIED
                            BOILER AND F66 SYSTEM OUTAGES DURING  JUNE  AND JULY WERE  FOR  ROUTINE
                            MAINTENANCE.
      AFFECTED MODULES:

SYSTEM      13.0         96.0       10,0.0

SYSTEM      61.0         99.0         99.0
13.0

28.0
744

744
103

207
 99

205
        •* PROBLEMS/SOLUTIONS/COKMENTS
              START DATE    8/78     tOUIfKENT:  PUMP, OTHER
              END DATE      8/78     PRCBICM:  NOT DEFINED/SPECIFIED
                                                  154

-------
                                              EPA UTILITY FRO SURVEY:  DECfMBER  1978  -  JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PFRF ORMA f.C E DATA FOR OPERATIONAL FED SYSTEMS
	.			PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY  CPERARU1TY PLIABILITY UTILIZATION
 9/78
                                                         X REMOVAL   PER  BOILER  F6D   CAP.
                                                         S02  PART. HOURS HOURS  HOURS  FACTOR
                           THE UNIT kAS 10UN FROM AUGUST  1  UNTHL  AUGUST  12  AS  A  RESULT OF  BLEED
                           PUMP PROBLEMS .
              AFFECTED  MODULES: SYSTEM
                    76.0
                                98.0
                                   100.0
41.0
7?0   303
                                                                                            Z98
        **  PRObLEMS/SOLUTlONS/COMMENTS
              START DATE   9/78     EQUIPMENT:  FGO  SYSTEM.  GENERAL
              END DATE     9/78     PROBLEM: PLUGGING,  OTHER
                           BECAUSE OF PLUGGING  PROBLEMS THE FG D  SYSTEM  WAS  OPERATED  AT  APPROXIMATELY
                           ONE THIRD OF  TOTAL  CAPACITY  THROUGHOUT  SEPTEMBER.
              AFFECTED MODULES: SYSTEM
 10/78   SYSTEM
                    30.0
                                94.0
                                    96.0
                                                         30.0
                                                                               744
                                                                                     Z36
        *•  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  10/78      E6UJFKENT:  RECYCLE  TANK
              END DATE    10/78      PROBLEM:  PLUGGING,  OTHER
                           T»E FCD  SYSTEM  EXPERIENCED  RECYCLE TANK  SCREEN PLUGGING.
              AFFECTED MODULES:  SYSTEM

        **  PROBLEMS/SOLUTIONS/COMWENTS
              START DATE  10/78      ECUKflENT:  FAN
              END DATE    10/78      PROEUrM;  NOT DEFINED/SPECIFIED
                           THE FCD  SYSTEM  EXPERIENCED  VIBRATING FAN PROBLEMS.
              AFFECTED MODULES:  SYSTEM
 11/7S  SYSTEM
                    24.0
                       100.0
                                             74.0
                                                         24. C
                                                                               730   175
                                                                                            175
        •* PROBtEMS/SOLUTIONS/COMMENTS
              START  DATE   11/76      EdUjfl'ENT:  FGO SYSTEM, ftNERAL
              END DATE     11/78      COMMENTS:
                            TkE  UNIT  HAS  IOWN THE LAST T«0 WEEKS OF NOVEMBER DUE TO LOU I.OAD DEMAND.
              AFFECTED  MODULES:  SYSTEM
 12/78

  1/79
SYSTEM

SYSTEM
                       744

                       672
                                                  155

-------
EPA UTILITY F&D SURVEY:  DECEMBER  197f  - JANUARY 1979
                                            SECTION 3
                     DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL F£D SYSTEMS
 COMPANY NAME
 PLANT NAME
 UNIT NUMBER
 CITY
 STATE
 REGULATORY  CLASSIFICATION
 PARTICULATE  EMISSION  LIMITATION - Nt/J
 S02  EMISSION  LIMITATION - kG/J
 NET  PLANT  GCNERATING  CAPACITY  - MW
 CROSS UNIT  GENERATING CAPACITY - MV
 NET  UNIT GENERATING CAPACITY W/FGD - M*
 NET  UNIT GENERATING CAPACITY WC/FGC - I»W
 EQUIVALENT  SCRUfBFD CAPACITY - CIW

 •» BOILER  DATA
      SUPPLIER
      TYPE
      SERVICE LOAD
      COMMERCIAL SERVICE DATfe
      MAXIMUM BOILER FLUE GAS FLOW - cu.c/s
      FLUE CAS  TEMPERATURf  - C
      STACK  HEIGHT - M
      STACK  TOP DIAMETER - K

  •*  FUEL DATA
      FUEL  TYPE
      FUEL  GRADE
      AVERAGE HEAT CONTENT - KJ/KG
      DANCE  HEAT CONTENT - BTU/IB
      AVERAGE ASH CONTENT - *
      RANGE  ASH CONTENT - *
      AVERAGE MOISTURE  CONTENT - X
      RANGE  MOISTURE CONTENT - *
      AVERAGE SULFUR CONTENT - Jf
      RANGE  SULFUR CONTENT - %
      AVERAGE CHLORIDE  CONTENT - t
      RANEE  CHLORIDT CONTENT - I
      FUEL  FIRING RATE - M T/H
      FUEL  FIRING RATE - MW
                                                            GAS s  ELECTRIC
                                                              (******
                                                              (****** LB/M.WBTU)
                                               LOUISVILLE
                                               CANE RUN
                                               4
                                               LOUISVILLE
                                               KENTUCKY
                                               ******
                                                 99?. 0
                                                 190.0
                                                 18?. 0
                                                 185.0
                                                 19P.O
                                               COMBUSTION ENGINEERING
                                               PULVERIZED COAL
                                               RASE
                                               *» /**
                                                 346.37       ( 734000 ACFH)
                                                 160.0        ( 3?0 F)
                                                  76.         < 250 FT>
                                               *******        (***** FT)
                                               COAL
                                               ******
                                                               < 11500 BTU/L.B)
                                                               ******
                                               ********
                                               15-16
                                               ***** ***
                                               ******
                                                   3.7S
                                               3.5-4.0
                                               ***** ***
                                               ******
                                               * * **** *
                                               * ****
C*** TPH)
• * ESP
    PARTICULATE DESIGN REMOVAL EfFICIEKY - *

•* F6D SYSTEM
    SALEABLE PRO DUCT/THROW AWAY PRODUCT
    GENERAL PROCESS TYPE
    PROCESS TYPE
    PROCESS ADDITIVES
    SYSTEM SUPPLIER
    DEVELOPMENT LEVEL
    NEW/RETROFIT
    PARTICULATE DESIGN REMOVAL EFFICIENCY . Z
    So2 DESIGN REMOVAL EFFICIENCY - it
    COMMERCIAL DATE
    INITIAL START-UP
    CONSTRUCTION INITIATION
    CONTRACT AWARDED
                                                    99.0
                                                 THROWAUAY  PRODUCT
                                                 WET SCRUBBING
                                                 LIMB
                                                 CARBIDE
                                                 AMERICAN AIR  FILTER
                                                 FULL-SCALE
                                                 RETROFIT
                                                    99.00
                                                    85.00
                                                   9/77
                                                   8/76
                                                 10/74
                                                   4/74
  ** ABSORBER
      TYPE
      INITIAL START UP
      SUPPLIER
      SHELL LINER MATERIAL
      L/6 RATIO - L/CU.M
      SO? DESIGN REMOVAL EFFICIENCY -

  ** FANS
      TYPE

  *• BIST ELIMINATOR
      MUMPER
      TYPE
      CONSTRUCTION MATERIAL
                                               MORUE BED  (PARALLEL)
                                                6/76
                                               AMERICAN  AIM  FILTER
                                               PRECRETE  AND  PLACITE  4005
                                                   P.O         (  60.0  6AL/1000ACF)
                                                  87.5
                                               ID BOOSTER
                                                4
                                               CHEVRON
                                               PLASITE  4005 LINING
                                                 156

-------
                                              EPA  UTILITY FGD SURVEY: DECEMBER 1978 - JANUARY 1979
                                            SECTION  3
                    DESIGN AND PERFORMA&CE  DATA  FOR OPERATIONAL F6D SYSTEMS
 **  TANKS
     SERVICE
     REACTANT-RECYCLE

 ** REHEATED
     TYPE
     TEMPERATURE BOOST - C

 ** THICKENER
     DIAMETER - M

 •* WATER LOOP
     TYPE
     FRESH MAKEUP WATER ADDITION  -  LITERS/S

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
                 NUMBER

                 ****
                 DIRECT COMBUSTION
                    27.8         (   50  F>
                    22.9
                 OPEN
                 FINAL
                 LINED POND
                 ON SITE
                                 ( 75 FT)
                                 <  100 GPW)
	.........	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY  OPERARILITV  PLIABILITY UTILIZATION
                                 X REMOVAL   PER  BOILER  FGO   CAP.
                                 S02  PART. HOURS HOURS  HOURS FACTOR
 8/76  SYSTEM
90.0
                        90.0
        87.50
                                                                              744   7*0
       •* PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE    8/76      E8U1IMENT:  FGD SYSTEM. GENERAL
             END DATE      8/76      PROBIFM: NOT DEFINED/SPECIFIED
                           OUTAGE  TIME  DIKING THE MONTH WAS DUE PRIMARILY TO EQUIPMENT INSPECTIONS,
                           RfcPAIR/REFLACEMENT OF AUXILIARY MOTOR PARTS, AND DEPLETION OF ABSORBENT
                           SUPPLY  BECAUSE OF A  LATE BARGE DELIVERY.
             AFFECTED  MODULES:  SYSTtfl

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE    R/76      EQUIPMENT:  F6D SYSTEM, GENERAL
             END DATE      8/76      COMMENTS:
                           THE  SCRUBBING SYSTEM HAS BEEN GENERALLY OPERATING AT APPROXIMATELY 50 TO
                           ft PFRCENT FLIE GAS  CAPACITY.
             AFFECTED  MODUlfcS:  SYSTEM

       **- PROBtEMS/SOLUTIONS/COWMENTS
             START  DATE    8/76      EQUIPMENT:  AUXILIARY EQUIPMENT
             END DATE      E/76      PROBlEM: NOT DEFINED/SPECIFIED
                           SOME  MINOR PRCBLEMS  HAVE BEEN ENCOUNTERED WITH AUXILIARY EQUIPMENT MOTORS.
             AFFECTED  MODULES:  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE    8/76      EQUIPMENT:  SPRAY NOZZLES
             END DATE      8/76      PROBLEM: NOT DEFINED/SPECIFIED
                           SOME  MINOR PRC8LEMS  HAVE BEEN ENCOUNTERED WITH SpRAY NOZ7LES IN THE MOBILE
                           BED  CONTACTOR.  THE  SPRAY NOZZLES ARE SF'INNER-VANE COMPONENTS ORIGINALLY
                           CONSTRUCTED  Of PLASTIC.  OPERATING TEMPERATURES AND PRESSURES HAVE CAUSED
                           THE  PLASTIC  HOUSING  TO EXPAND RESULTING IN THE VANES EXTRUDING OUT THE
                           FRONT END, SUBSEQUENTLY CAUSING A BLOCKAGE OF THE SLURRY FEED.  THE NOZZLE
                           HAVE  BEEN REPtACED WITH CERAMIC CONSTRUCTED COMPONENTS.
             AFFECTED  MODULES:  SYSTEM
 9/76  SYSTEM

10/76  SYSTEM
90.0

90.0
90.0

7J.O
720

744
                                                                                    7?0
       •* PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE   10/76     EQUIPMENT: FGD SYSTEM, GENERAL
             END  DATE     10/76     PROBLEM: NOT DEFINED/SPECIFIED
                           THE  UNIT  WAS 1AKEN OUT OF SERVICE ON OCTOBER 25, 1976 TO IMPLEMENT
                           ADDITIONAL MODIFICATIONS TO THE SCRUBBING SYSTEM.  MAJOR SYSTEM MODIFICA-
                           T10NS  INCLUDE INCREASING PUMP CAPACITY AND DECREASING PRESSURE DROP.
                           THESE  TUO PROBLEMS HAVE HINDERED OPERATION OF THE UNIT AT FULL LOAD
                                                157

-------
FPA UTILITY  FGD  SURVEY: DECEMBER 1978 - JANUARY  1979
                                             SECTION  3
                     DESIGN AND PFRFORMAKE  DATA  FOR OPERATIONAL FGD SYSTEMS
----------------------- ...... ------------- PERFORMANCE  DATA
PERIOD MODULE  AVAUABIL1TY OPERAPU1TY SUABILITY UTILIZATION
                                                                                    BOZIER
                           CAPACITY.
              AFFECTED MODULES: SYSTEM

           PROBLEMS/SOLUTIONS/COMMENTS
              START DAT?  10/76     tOUIFHENT:  F6D  SYSTEM, GENERAL
              END DOTE    10/76     COtfMlNTS:
                           TC DATE, THt  fECHANICAL  RELIABILITY Of THE SYSTEM  AS  A  FUNCTION OF
                           SfcRVICE TIKE  IFRSUS  OUTAGE  TIME, HAS BEEN VERY 600D .
              AFfECTEO MODULES: SYSTEM
 12/76

  1/77
        SYSTEM

        SYSTEM


        SYSTEM
¥5.0

9Q.O
720

744


744
  2/77
  3/77
  4/77
        **  PROELEMS/SOLUTIONS/COMWENTS
              START DATE   1/77     EBUIf^ENT:  F6D  SYSTEM,  GENERAL
              END DATE     3/77     COMMINTS:
                           DIE TO OHIO  RIVER FREEZE Up PAR6E DELIVERIES OF  LIKE  CEASED.
              AFFECTED MODULES:  SYSTEM
        SYSTEM
                                                                                672
        ** PR06LEMS/SOLUTIONS/COMMENTS
              START DATE   2/77      EAUIMKENT:  F6B  SYSTEM, GENERAL
              END DATE     2/77      COMMENTS:
                           DtRINfi  FEEiRUATV,  THE  SCRUBBER UAS ONLY OPERATED  FOR  TWO  4-HOUR PERIODS
                           TO PREVENT TOTAL  FREEZE-UP.
              AFFECTED MODULES:  SYSTEM
                                P3.0                     83.0

        **  PROBLEMS/SOLUTIONS/CCMMENTS
              START DATE   3/77     tOUIVMENT:  FGD  SYSTEM,  GENERAL
              END DATE     3/77     COMMfNTS:
                           THE SCRUBBER  CAME BACK ON-LINE  ON MARCH U, 1977.
              AFFECTED MODULES:
                                                                                744   43Z
        ** PROSLEMS/SOLUTIONS/COMMENTT
              START DATE   3/77      EQUIPMENT:  GAS  DAMPER
              END DATE     3/77      PROBLEM:  NOT DEFINED/SPECIFIED
                           DC POWER  SUPPtY  TO THE BYpASS DAMPER  FAILED.   THE  SCRUBBER SYSTEM WAS
                           BYPASSED  hHILF  REPAIRS WERE MADE.
              AFFECTED MODULES!  SYSTEM
        SYSTEM
                                                                                7X0
        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   4/77      tOUllMENT:  F60 SYSTFH, GtMRAL
              END DATE     7/77      COMMENTS:
                           THE SCRUBBING  SYSTEM WAS DOWN TOR MODIFICATIONS  FROM APRIL 18 TO  JOLT  17,
                           1977.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/CCMMENTS
              START DATE   4/77      t6UIF»ENT:  MIST ELIMINATOR
              END DATE     7/77      FROBlf-M: NOT BE FINED/SPF CI F IEB
                           A CHFVRON TYPF MIST  ELIMINATOR WAS INSTALLED DURIN6 THE OUTA6E
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   4/77      tSUIHWENT:  PIPING
              END DATE     7/77      PR061F:M: NOT DEFINED/SPECIFIED
                                                 158

-------
                                               EPA  UTILITY F60 SURVEY: DECEMBER 1978  -  JANUARY  1979
                                             SECTION  i
                     DESIGN AND PERFOFUAKCE  DATA  FOR OPERATIONAL FED SYSTEMS
	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY OPERABILITY  RELIABILITY  UTILIZATION
                                                                  X REMOVAL   PER  BOILER   FGD    CAP.
                                                                  S02  PART. HOURS HOURS   HOURS  FACTOR
                           A NEW SPRAY HINDER  WAS  ADDED TO INCREASE THE L/6 RATIO  DURIN6  THE OUTAGE.
              AFFECTED MODULES: SYSTEM

        **  PR06LEMS/SOLUTIONS/CCMHENTK
              START DATE   */77      fOUIFKENT: RECYCLE TANK
              END DATE     7/77      PROBLEM: NOT DEFINED/SPECIFIED
                           DIRECT OIL-FIXED  REHEAT WAS ADDED DURING THE OUTAGE;
              AFFECTED MODULES: .SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   4/77      ESUIFKENT: DUCTWORK
              END DATE     7/77      FROBI.EM: DESIGN-RELATED INFERIOR CONSTRUCTION  MATERIAL
                           ThE LINING  IN  THE SYSTEM FROM THE MIST ELIMINATOR TO THE  STACK WAS  REPLACE
                           WITH PLASITl  40Q5  (THE  ORIGINAL LINING MAS BUBPLINGt BUT  HAD NOT YET
                           FAILED,  FAUtHE  SEEMED  IMMINENT WITHIN 4-5 MONTHS).  THE  NEU LINING WAS
                           INSTALLED tY  LENERAL COATINGS.
              AFFECTED MODULES: SYSTlf
  5/77


  6/77


  7/77
  9/77

 10/77
 11/77

 12/77

  1/78
SYSTEM


SYSTEM

SYSTEM
90.0
43
                                               74*

                                               no
                                               744   3«0
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    7/77      E.BUIPMENT: F60 SYSTEM. GENERAL
              END DATE      7/77      COWMtNTS:
                            THE  SYSTFH KAS PLACED BACK IN SERVICE ON  JULY  17,  1977  AFTER  SYSTEM
                            MODIFICATIONS MERE COMPLETED.
              AFFECTED  MODULES:  SYSTEK
  8/77  SYSTEM
                                 94.0
                                                          93.0
                                                                                744    657
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    8/77     EQUIPMENT: FGD SYSTEM,  GENERAL
              END  DATE      9/77     COMMfNTS:
                            COMPLIANCE TESTING OCCURFD  OURIN6  AUGUST  AND  SEPTEMBER 1977 BY EPA
                            PERSONNEL AND VAS OFFICIALLT  APPROVFO  TO  HAVE ACHIEVED COMPLIANCEV
              AFFECTED  MODULES: SYSTEM
SYSTEM

SYSTEM
99.0

98.0
99.0

89.0
720   529

744   677
        ** PROBLEMS/SOLUT10NS/CCMMENTS
               START  DATE  10/77     E6UIFHF.NT:  REAGENT  HANDLING

                            DURING DECFMBER, "AIRCO",  THE  LIME SUPPLIER, HAD 1200 FT OF THEIR FEED
                            LINE FREEZE Ut.
               AFFECTED  MODULES: SYSTEM
 SYSTEM

 SYSTEM

 SYSTEM
94.0

85.0

67.0
63.0

82.0

67.0
720   483

744   715

744
        A* PROBLEMS/SOLUTIONS/COMMENTS
               START DATE   1/78     EOUIFWENT:  FGO SYSTEM,  GENERAL

               END DATE     1/78 ^^"5™^^ *0" * TIME BUT THERE HERE NO SCRUBBER BREAKDOWNS.
               AFFECTED MODULES: SYSTEM
  2/76
         SYSTEM
                                                                                672
                                                  159

-------
FPA UTILITY  fGD  SURVEY:  DECtWE'ER 197f - JANUARY  1979
                                             SECTION  3
                     DESIGN AND PERFOPMAKE  DATA  FOR  OPERATIONAL FGD SYSTEMS
------------------------------------------ PERFORMANCF  DATA
PERIOD MODULE  AVAILABILITY CPErA.ILlTY  .ELIAB1L1TT UTILIZATION   *B«"«AL^
                                                                                    BO It EH
  3/7P

  4/7F,
  6/78

  7/78

  8/78
 10/78


 11/78

 13/78
  1/79
        *•  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   ?/78      E 8U1 Fi-ENT:  FGO  SYSTEM, 6ENERAL
              END DATE     3 111      COMMtNTS:                                             ..„„,.,-
                           ThE UNIT  WAS  tOWN THE  ENTIRE MONTH OF FEBRUARY  DUE  TO A  COAL SHORTAGE
                           AKD A LACK OF  AVAILABLE  LIME RESULTING FROM THE  SEVERE WINTER WEATHtR.
                           TfE UNIT  CAME  i ACK  ON  LINE  MARCH 21, 1978.
              AFFtCTED MODULES: SYSTtK
        SYSTEM
                               1DQ.O
                                                         47.0
                                                                               720    303
        *•  PRObLEMS/SOLUTIONS/CCMMENTS
              START DATE   4/78     E6U!M»ENT:  BOlLfR-RELATFD
              END DATE     4/7fi     (RCBUM:  NOT  DEFINED/SPECIFIED
                           DtRING APHL  1HE BOILER  WAS  DOWN FOR REPAIRS.
              AFFECTED MODULES:  SYSTEM
  5/78   SYSTEM
                    31.0
                                35.0
             35.0
12.f>
                                                                                744   352
        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   5 >78      EUUirPENT:  BOI LER-RELATF D
              END DATE     5/7f      fFOPl'M:  NOT  DEFINED/SPECIFIED
                           TFE (3C1LFR UA!  DOhN  AGAIN IN MAY (OR REPAIRS.
              AFFECTED MODULES;  SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   5 /78      EGUIFfENT:  6AS  DAMPER
              END DATE     5/7B      FfCPLfM:  NOT  DEFINED/SPECIFIED
                           DURINC THE MAt  BOILER  OUTAGE A NUMBER OF MODIFICATIONS VtRE MAKE TO  THE
                           DAMPERS  IN TMC  FSD SYSTEM.
              AfFECTEO MQDULES:  SYSTEM
        SYSTEM

        SYSTEM

        SYSTEM

        SYSTEM
 99.0

 99.0

 94.0

100.0
99.0

91 .0

94.0

19.0
7ZO

744

744

720
720

687

744

138
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START BATE   9/76      EOUIFRENT:  BOlLFR-RELATFD
              END DATE    11/78      PR061EM:  NOT DEFINED/SPECIFIED
                           ThE BOILER WAS  DOWN  IN SEPTEMBER TO NOVEHBFR  1978 FOR TUBE REPAIRS.
              AFFECTED MODULES:  SYSTEM
        SYSTEM

        SYSTEM


        SYSTEM
 97.0
                          58.0
                       744

                       720


                       744
      472
        **  PROdLEMS/SOLUTTONS/COMWENTS
              START BATE  12/78      EOUI F1HENT:  BOILER-RELATED
              ENp DATE     1/79      PROBLEM: NOT DEFINED/SPECIFIED
                           DURING  THIS  PrRiOD A TURPINE BECAME UNOPERATIONAL.  THE UNIT  IS  EXPECTED T
                           fit OFF  LINE  UkTIL APRIL.
              AFFECTED MODULES:  SYSTEM
        SYSTEM
                                                                                744
                                                 160

-------
                         EPA UTILITY  F60  SURVEY:  DECEMBER  1978  -  JANUARY  1979
                        SECTION  3
DESIGN AND PERFORMANCE  DATA FOR OPERATIONAL  F6D  SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION - KiG/J
S02 EMISSION LIMITATION  -  N6/J
NET PLANT GENERATING CAPACITY  - MW
GROSS UNIT GENERATING  CAPACITY  - MM
NET UNIT GENERATING CAPACITY W/FGO - «».
NET UNIT GENERATING CAPACITY WO/FGC - CV
EOUIVALF.NT SCRUBBED CAPACITY -  NW

** BOILER DATA
    SUPPLIER
    TYPF.
    SERVICE LOAD
    COMMERCIAL  SERVICE DATfc.
    MAXIMUM BOILER  FLUfc GAS FLOW - CU.f'/S
    FLUE GAS TEMPERATURF - C
    STACK HEIGHT  -  M
    STACK TOP  DIAMETER - M

**  FUEL DATA
     FUEt TYPE
     FUEL GRADE
    AVERAGE  HEAT  CONTENT - KJ/KG
    RANGE HEAT  CONTENT - BTU/LB
    AVERAGE  ASH CONTENT - *
     RANGE  ASH  CONTENT  - X
    AVERAGE  MOISTURE  CONTENT - X
     RANGE  MOISTURE  CONTENT - X
     AVERAGE  SULFUR  CONTENT - X
     RANGE  SULFUR  CONTENT - X
     AVERAGE  CHLOR1DF  CONTEXT - X
     RANGE  CHLORIDE  CONTENT - X
     FUEL  FIRING RATE  - M T/H
     FUEL  FIRING RATE  - MW

 *• ESP

 ** F6D SYSTEM
     SALEABLE  PRODUCT/THROW AWAY PRODUCT
     GENERAL PROCESS TYPE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM  SUPPLIER
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     PARTICULATE DESIGN  REMOVAL EFFICIENCY
     S02 DESIGN REMOVAL  EFFICIENCY  -  X
     COMMERCIAL DATE
     INITIAL START-UP
     CONSTRUCTION INITIATION
     CONTRACT AWARDED

 ** ABSORBER
     NUMBER
     TYPE
     INITIAL START UP

 ** REHEATER
     TYPF
     HEATING MEDIUM
     TEMPERATURE BOOST  - C

 ** THICKENER
     NUMBER

 ** HATER LOOP
     TYPE

 ** TREATMENT
     CONTRACTOR
                            LOUISVILLE  £AS  R  ELECTRIC
                            CANE  RUN
                                            (***»**  LB/MMBTU)
                                            (******  UB/NMBTU)
LOUISVJLLE
KENTUCKY
A
******
******
  
-------
    UTILITY fCD SUBVFY;  DECE^PER 1?7f - JANUARY  1979

                                             SECTION  3
                     DESIGN  AND PERFOPMKfE  DATA  FOR OPERATIONAL FGO  SYSTFMS
 **  DISPOSAL
     NATURE
     TYPE
     LOCATION
                                           F INAL
                                           LINED  POND
                                           ON  SITE
                                    PERFORMANCE  DATA
MODULE AVAILABILITY  OPERABILITY PLIABILITY  UTILIZATION
                                                                                    BOILER
12/77  SYSTEM
 3/7f

 4/78
 5/78

 6/78
 7/7P

 8/78
                                                                                7*4
       ** PRObLEMS/SOLUTJONS/COMMENTS
              START  DATE  12/77     [OUJFf'ENT:  F6D  SYSTsMf
              tND  DATE    1?/77     COMMtNTS:
                           OPERATION OF  THE  F6D  SYSTEM BEGAN ON DECEMBER  79. 1977-
                           TIONS WERE NOT  CONTINUOUS.
              AFFFCTED MODULES: SYSTEM
                                                                               INITIAL  OPERA
 1/7S  SYSTEM
                                                                                7*4
       •* PROBLEWS/SOLUTIONS/COMMENTS
              START  DATE   1/78     tOUUNENT:  INSTRUMENTATION
              tND DATE     1/76     PR06UM:  NOT DEFINED/SPECIFIED
                           SCME OF THE  CCNTROLS  WERE NOT WORKING PROPERLY  AND MODIFl3*71ONS  HERE
                           NICETSARY.
              AFFECTED MODULES: SYSTEM
 2/7B   SYSTEM
                                                                                672
        **  PROBLEMS/SOLUTIONS/COMMENU
              START DATE   2/7?      fOUjFI'ENT:  F6D SYSTEM* GENERAL
              END DATE     }/7fe      FPOPliT:  NOT D E F IME D/S PE CI F I £0
                           THE TLANT  FEMP1NED OFF LINE THROUGHOUT  FEBRUARY  AND RESTARTED  ON  HA"CH 2*.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/CCMHENTS
              START DATE   2/78      EGDIF-KENT:  F60 SYSTEH, EENERAt
              END DATE     3/78      PROBlFN:  NOT DEFIM£D/SPECIFI ED
                           VARIOUS  IMTI  I  STAR-UP PROBLEMS %ERE STILL  GEIN6 ENCOUNTERED  CAUSING
                           FCD SYSTEM OUTAGES.
              AFFECTED MODULES: SYSTEM
SYSTEM
        SYSTEM
50.0

97.0
                                                  12.?

                                                  90.C
                       744   182

                       7?0   669
        **  PROBLEMS/SOLUTIONS/CCMHENTS
              START DATE   4/78      tCUI[*ENT: F6D SYSTEM, GENERAL
              END DATE     5/78      CCHUCNTS:
                           F6D  SYSTEM  MODIFICATIONS WERE MADE  DURING THIS TIME IN  PREPAR1T90N FOR
                           PtRFORMANCE  TFSTS.  HOWEVER THE EPA  TEST METHODS WERE NOT  FOLLOWED
                           ACCURATELY'
              AFFECTtD MODULES:  SYSTEM
SYSTEM

SYSTEM
84.0

86.0
49.0

82.0
744   432

720   685
           PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/78      teUIFWENT: REAGENT HANDL1N6
              tND DATE     7/78      PROBLFM: DtSIGN-RFLATED  INFERIOR CONSTRUCTION MATERIAL
                           TI-E  STEAM REHEAT COIL INSTALLATION HAS BEEN A CHRONIC  PROBL5H AREA.
                           HAVE  PEEN FAILING EVER SINCE  INITIAL OPERATIONS.
              AFFECTED MODULES-  SYSTEM
                                                                                            WELDS
SYSTEM

SYSTEM
?0.0

P6.0
68. 0

62.0
744

744
632

5*0
           PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   8/78      £6UlFMENT: REAGENT  HANDLING
              END DATE     9/78      FP.OEHFM: DESIGN-RELATED  INFERIOR CONSTRUCTION MATERIAL
                                                 162

-------
                                               EPA  UTILITY FGD SURVEY: DECEMBER  1978  -  JANUARY  1979
                                             StCTlON 3
                     DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL FGD SYSTEMS
._—_	.	........	.......	-PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY UPC ft API L 1TY  f,f LI Ab ILITY UTILIZATION
                                                           X  REMOVAL    PER  BOILER  FED   CAP.
                                                           S02  PART. HOURS HOURS  HOURS FACTOR
 9/78

10/7P
                           PROBLEMS  CONTINUED WITH THF REHEAT COILS.
              AFFECTED MODULES:  A
SYSTEM

SYSTEM
BO.O

96.0
67.0

71.0
720

744
609

570
        **  PRDSLEMS/SOLllTIONS/COKMENTS
              START DATE   10/7P      tCLlJ fi*ENTt REAGENT HANDL1N6
              tND DATE     11/76      FRObLFK: DESIGN-RELATED  INFERIOR  CONSTRUCTION MATERIAL
                            TKt  SYSTEM WAS SHUTDOWN FOR REPAIRS TO  THE STEAM  REHEATE.R  COILS.
                            OUTAGE  LASTED ABOUT TWO WEEKS.
              AFFECTED MODULES:  SYSTt*
11/7? SYSTEM
12/7? SYSTEW
1/79 SYSTEM

54.7
69.6
94.0
46.2
67.4

46.2
67.4
33.0
40.6
62.?
                                                                                7ZO

                                                                                744

                                                                                744
                                                                              253

                                                                              654

                                                                              693
                                                                                       THE
                                                            302

                                                            467
                                                   163

-------
tP» UTILITY  FCD  SURVEY: DECEMbFP 197?  -  JANUARY  1979
                                             SECTION ?
                     DESIGN AND FF R FORM K E  DATA  FOR OPERATIONAL FED SYSTEMS
COMPANY NAKE
PLANT NAMF
UNIT NUMBER
CITY
STATE
REGULATORY  CLASSIFICATION
PART1CULATE  EMISSION  LIMITATION - NG/J
SO? EMISSION  LIMITATION - KC/J
NFT PLANT  GFNER«TING  CAPACITY - MW
GROSS UNIT  GENERATING CAPACITY - Mk
NFT UNIT GEHIRATIKG CAPACITY k'/FGD - »w
NET UNIT GENERATING CAPACITY WO/FGl -  !>h
EOUIVALFNT  SCRUPBFD CAPACITY - MW

** noiLFR  DATA
    SUPPL1ER
    TYPF
    SERVICE  LOAP
    COMMERCIAL  SERVICE DATt
    MAXIMUM BOILER FLUE GAS  FLOW - CU.f/S
    FLUE GAS  TEMPERATURE - C
    STACK  HEIGHT  - M
    STACK  TOP DIAMETER - M

*«  FUEL  DATA
     FUEL TYPE
     FUEL GRADE
    AVERAGE HEAT  CONTENT - KJ/KG
    RANGE  HEAT  CONTENT - BTU/Lt
    AVERAGE ASH CONTENT - »
    RANTE  ASH CONTENT - X
    AVERAGE MOISTURE  CONTFI\T - Z
    RANGE  MOISTURE CONTFNT - X
    AVERAGE SULFUR CONTENT - 2
     RANGE  SULFUR  CONTENT - X
    AVERAGE CHLORIDF  CONTEIsT - X
    RANGE  CHLORIDE CONTENT - X
     FUEL  FIRING RATE  - f T/H
     FUEL  FIRING RATE  - MW
                                                  LOUISVILLE £AS K  ELECTRIC
                                                  KILL CREEK
                                                  LOUI5VILLE
                                                  KENTUCKY
                                                  B
                                                  ***** *
                                                  ******
                                                  *******
                    {*.**** LP/MMBTU)
                    (****** LF/NMfcTU)
                                                    425.0

                                                    <25.0
                                                  BABCOCK AND UlLCOX
                                                  puLvnoizro COAL
                                                  BASE
                                                  **/**
                                                  ********        (*******  «CFM)
                                                  *******         (****  F>
                                                  ******          (****  FT)
                                                  *******         (*****  FT)
                                                  COAL
                                                  BITUMINOUS
                                                   Z6749.

                                                     11.50
                                                  ******
                                                  ********
                                                  3.75
                                                      3.75
                                                  3.5-4.0
                                                  ********
                                                  ******
                                                  *******
                                                  *****
                    < 11500 BTU/LB)
                     ******
                     {*** TPH)
  ** ESP
  •* FGD SYSTEM
      SALEABLE P RO DUCT /THROU AWAY PRODUCT
      GENERAL  PROCESS  TYPE
      PROCESS  TYPE.
      PROCESS  ADDITIVES
      SYSTEM SUPPLIER
      DEVELOPMENT  LFVEL
      NEW/RETROFIT
      PARTICULATE  DESIGN  REMOVAL FFF1CIEKY
      SQ2 DESIGN REMOVAL  EFFICIENCY - X
      INITIAL  START-UP

  *« ABSORBER
      NUMBER
      TYPF
      INITIAL  START  UP
      SHELL MATERIAL
      SHELL LINER  MATERIAL
     THROWAWAY PRODUCT
     WET SCRUBBING
     LIME
     CARBIDE  .
     AMERICAN AIR FILTER
     fULL-SCAlt
     NEW
- 1     99.00
        85.00
      8/7P
     MOBILE BED  SPRAY  TOWER
      8/78
     CARBON STEEL
     PRECRETE
      HEATING MEDIUM

  «* WATER LOOP
      T»PF
      FRESH MAKEUP  WATER  ADDITION - LITE^/S

  ** TREATMENT
      TYPE

  ** DISPOSAL
      NATURE
      TYPF
     STEAM
     OPEN
         9.4
                     (  150 6PM)
     FLYASH  AMD  LIME  STABILIZED
     FINAL
     SLUDGE  POND
                                                  164

-------
                                              EPA UTILITY FI50 SURVEY:  DECEMBER  1V7g  -  JANUAPY  1«79
                                            SECTION 3
                     DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL  FGO SVSTFHS
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY OPEPABILITY PLIABILITY UTILIZATION  X  REMOVAL   PER   BOILER   F6D   CAP-
                                                                 £02   PART.  HOURS  HOURS  HOURS  FACTOR
 8/78
  9/78
 10/78

 11/78
        SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   B/78     teUIHfENT:  FGD  SYSTEM,  GENERAL
              END DATE     B/78     COMMtNTS:
                           OPERATION BEG'M  ON  AUGUST  13,  1978.
              AFFECTED MODULES: SYSTEM
                                                                       744
                                81.0
                                                 80.0
                                              720   7U
        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   9/78     EQUIPMENT:  PIPING
              END DATE     9/78     PFOBlfcM: NOT  DEFINED/SPECIFIED
                           FRP PIPING PPCBLEMS  WERE  ENCOUNTERED.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SQLUTIONS/COMMENTS
              START DATE   9/78
              END DATE     9/78
                           PUMP PROBLEMS  WERE  RELATED  TO BEARING  AND  SHAFT  FAILURES.
              AFFECTED MODULES: SYSTEM
SYSTEM

SYSTEM
a«.o
85.0
81.0

42. 0
744

720
710

351
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START BATE   11/78      E6UIFHENT:  BOILER-RELATE 0
              END DATE     11/78      COMMtNT: PREVENTIVE MAINTENANCE
                            THE UNIT  WAS SHUT DOWN NOVEMBER 18t 1978 FOR SCHDULED INSPECTION.   RFSTA&T
                            IS  PROJECTED FOR FEBRUARY 1, 1979.
              AFFECTED  MODULES:  SYSTEM
 12/78
        SYSTEM

        •*
                                                                               744
               START  DATE   12/78     E8UIFWENT: F6D SYSTEM, GENERAL
               END  DATE      1/7?     COMMINTS:
                            THE UNIT DID NOT OPERATE DURING DECEMBER OR JANUARY.
               AFFECTED  MODULES: SYSTEM
  1/79
        SYSTEM
                                                                               744
                                                  16!

-------
   UTILITY F6D SURVEY: DECEPbER  197f  -  JANUARY 1979

                                           SECTION 3
                   DESIGN  AND  FERFORMAHE  DATA FOR OPERATIONAL fCD SYSTEMS
COMPANY NAMF
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY  CLASSIFICATION
PARTICULATE  EMISSION  LIMITATION - NG/J
S02 EMISSION LIMITATION  -  KG/J
NfT PLANT GENERATING  CAPACITY - MW
GROSS UNIT  GENERATING CAPACITY  - Mfc
NET UNIT GENERATING  CAPACITY W/FGD - <"
N?T UNIT GENERATING  CAPACITY WO/FGt> -
EOUIVALFNT  SCRUBBED  CAPACITY -  MW

** F01LER OA1A
    SUPPLIER
    TYPE
    SERVICE LOAD
    COMMERCIAL  SERVICE  DATt
    MAXIMUM BOILER  FLUE  GAS FLOW - fU.
    FLUE GAS TEHPFRATURT - C
    STACK HEIGHT  -  If
    STACK TCP  DIAMETER  - M

** FUEL  DATA
    FUEL TYPE
    FUEL GRADE
    AVERAGE HEAT  CONTENT - KJ/KG
    RANfiE HEAT  CONTENT  - BTU/LE>
    AVERAGE ASH CONTENT - X
    RANEE ASH  CONTENT - X
    AVERAGE MOISTURE  CONTENT -  X
    RANGE MOISTURE  CONTENT - *
    AVERAGE SULFUR  CONTENT - X
    RANGE SULFUR  CONTENT - X
    AVERAGE CHLOR1DF  CONTENT -  X
    RANGE CHLORIDE  CONTENT - *
     FUEL  F IRING RATE  -  "I T/H
     FUEL  FIR1N6 RATE  -  MU

**  FSP
    LOUISVILLE  6»S t ELECTRIC
    PADDY'S  RUN
    6
    LOUISVILLE
    KENTUCKY
    C
        43.          (  .100 L9/MMBTU)
       516.          f 1.200 LB/MMBTU)
    »** ****
        70.0
        64.0
        65.0
        70.0
     FOSTER WHEELER
     DRY POTTOM, PULVERIZED COAL
     SUMMER PEAKING LOAD
      0/51
       18?.76       < 400000 ACFM)
       17-?.*        ( 355 F)
        76.         < 250 FT)
     *******        (***** FT)
     SUPPLIER
     PARTICIPATE DESIGN REMOVAL EFFICIENCY

 **  FGD  SYSTEM
     SALEABLE  PRO* UCT/THROW AWAY PRODUCT
     GENERAL PROCESS TYPE
     PROCESS TYPE
     PROCESS ADDITIVES
     SYSTEM SUPPLIER
     CONSTRUCTION FIRM
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     PARTICULATE DESIGN REMOVAL EFF1C1EACV
     502 DESIGN REMOVAL EFFICIENCY - X
     INITIAL START-UP
     CONSTRUCTION COMPLETION
     CONSTRUCTION INITIATION
     CONTRACT  AWARDED
     STARTED REfiUESTING BIDS
     STARTED PRELIMINAV DESIGN

 **  ABSORBFR
     NUMBER
     TYPE
     INITIAL START UP
     SUPPLIER
     NUMPER OF STAGES
     DIMENSIONS
     SHELL MATERIAL
     SHELL LINER MATERIAL
     6AS FLOW  - CU.M/S
     £AS TEMPERATURE - C
     L/6 RATIO - L/CU.M
     PRESSURE  D»OP - KPA
     COAL
     * *****
      26749.

        11.50
     ******
     ********
     ******
         2.50
     2.0-3.5
     ********
     ******
     ***** **
     *****
(  11500 BTU/L8)
 ******
(*** TPM)
     RESEARCH COTTRELL
- X     99-1
     THROVAWAY PRODUCT
     WET SCRUBBING
     LIME
     CARBIDE
     COMBUSTION ENGINEERING
     PIONEER SERVICES
     FULL-SCALE
     RETROFIT
- X     99.10
        9H.OO
      4/7?
      4/73
      6/72
      7/71
     12/70
      0/70
     MARBLE BED
      4/73
     COMBUSTION
         2
     17X1&X50 HlgH
     2 1/2 INCH  THICK  FRP
     316 SS
        82.58        (  175000 ACFM)
       176.7         (   350  f)
         2.2         (  16.5  6AL/1000ACF)
         2.9         (11.5  IN-H20)
                                                166

-------
                                             EPA UTILITY  FGD  SURVEY:  DECEMBER  1978  - JANUARY  1*79
                                           SECTION 3
                   DESIGN  AND  PERF CPU A KC E CAT* FOR OPERATIONAL  F6D  SYSTEMS
    SUPERflCAL GAS VELOCITY - H/SEC
    SO2 INLtT CONCENTRATION - PPM

** VACUUM FILTER
    NUMBER
    TYPE
    CONSTRUCTION  MATERIAL
    CAPACITY - W  T/D
    INLET SOLIDS  - *
    OUTLET SOLltS -  X

i* WIST ELIMINATOR
    NUMBER
    TYPE
    CONSTRUCTION  MATERIAL
    FREFBOARO  DISTANCE  - H
    DEPTH -  N
    VANE SPACING  - CM
    VANE ANGLES
    WASH SYSTEM
    PRESSURE  DROP -  KPA

** TANKS
    SERVICE
     REACTION  TANK
     SCRUBBER  RECIRCULATION
     REACTION  SUR6E TANK
     ADDITIVE  SLURRY TANK

 **  REHEATER
     TYPE
     TEMPERATURE BOOST - C

 **  THICKENER
     NUMBER
     DIAMETER  - M
     OUTLET SOLIDS - X

 **  MATER  LOOP
     TYPE
     FRESH MAKEUP WATER  ADDITION

 **  TREATMENT
     TYpE
     SUPPLIER
                                                     2.7
                                                  2000
                                                ROTARY  OR UK
                                                NYLON BELT
                                                   217.7
                                                    22.0
                                                    45,0
(  9.0 FT/S)
<  240 T/ft)
                                                 CHEVRON
                                                 FIBERGLASS
                                                     1.37       ( 4.5 FT)
                                                     1.52       ( 5.0 FT)
                                                     2.5         ( 1.00 IN)
                                                 45  DEG.
                                                 WATER  HASH-RIVER,  60 PSI,  100-200  6PM, DURATION
                                                      .4         ( 1.5 JN-H205
                                                 NUMBFR

                                                 • ***
                                                 * **»
                                                 *«**
                                                 ****
                                                 DIRECT COMBUSTION
                                                    21.7        (   39 F)
                                                    15.Z
                                                    22.0
                                                 CLOSED
i 50 FT)
                                                                (   50 6PM)
                                                 FIXATION WITH LIME
                                                 NONPROPR1ETARY
 ** DISPOSAL
     NATURE
     TYPE
     TRANSPORTATION
     AREA - ACRES
     CAPACITY - CU.H
                                                 FINAL
                                                 UNLINED POND
                                                 TRUCK
                                                    10.0
                                                      30575     <
     Z5.0 ACRE-FT)
------------------------------------------ PERFORMANCE DATA
PERIOD MODULE AVAILABILITY  OPERAeitlTY PLIABILITY UTILIZATION
                                                                                  ..ILEt
 4/73
       6A
       6P
       SYSTEM
                                1S.O
                                56.0
                                                                               720
       ** PROHLEMS/SOLUTIONS/COMMENTS
             START  DATE    4/73     E8UIF«ENTr F6D SYSTEM. 6ENERAL

             EN°  D*TE      MONIES w"l"cPMATED ONE AT A TI«E,  «TH  FREQUENT  SNUTDONNS  FOR  INSPECTIO
                           OF E8UIPMENT AND MINOR REPAIRS.
             AFFECTED  MODULES: SYSTEM
 5/73  6A
                                11.0
                                                167

-------
EPA UTILITY  F6D  SURVEY:  DECtKBFR 197f - JANUARY  1?79
                                             SECTION  3
                     DESIGN AND PERFORKAUCE  DATA  FOP OPERATICNAL FfiP SYSTEMS
			PERFORMANCE  DATA	
PERIOD  MODULE  AVAILABILITY OPERAB1LITY  (PLIABILITY  UTILIZATION  * REMOVAL    PER   BOILER  FPD    CAP.
                                                                  SO?  PART.  HOURS HOURS  HOURS  FACTOR

        66                       65.0
        SYSTEM                                                                   '**

        **  PROGLEMS/SOLUTIONS/COMWENTS
              START DATE   5/73     tGllir-ENT:  FGD  SYSTEM,  GENERAL
              £N0 DATE     5/73     COMMENTS:
                           SINGLE-MODULE OPERATION  CONTINUED THROUGH MAY 1«t  WHEN THE  UNIT WAS  SHUT
                           DOWN FOR MODI FICATIONS.
              AFFECTED MOOULfS: SYSTtM

        »*  PRCBLEMS/SOLUTIOMS/COMMENTS
              START DATE   5/73     tCUIFMENT:  THICKENER
              END DATE     5/73     PKOBlfM: NOT  DEFINED/SPECIFIED
                           EQUIPMENT WAS INSTALLED  FOP  INJECTION OF A FLOCCULATING  AGENT INTO THE
                           CLARIFIER TAN*.
              AFFECTED MODULES: SYSTEK

  6/73   6A                        1.0
        6P                        6.0
        SYSTEM                                                                   720

        •«  PROBLEMS/SOLUTIONS/CCMMENTS
              START DATE   6/73     EOtltKENT:  RECYCLE  PUMP
              END DATF     6/73     Pf'OBlfM: MECHANICAL-RELATED COMPONENT INEFFICIENCY
                           OPERATION WAS INTEHMITTENT  FROf  JUNE 19 TO JULY  11  BECAUSE  OF MECHANICAL
                           PROBLEMS klTH THE SLURRY  PUMPS.
              AFFECTED MODULES: SYSTff

  7/73   6A                       ?1.0
        6P                       21.0
        SYSTEM                                                                   7««

        *«  PROSLEMS/SOLUTIONS/COMMENTS
              START DATE   7/73     EOUIPMENT:  REAGENT  HANDLING
              END DATE     7/73     MOPUM: CHEMICAL-RELATED PLUGGING
                           DURING A SCHEDULED  OUTAGE FROM JULY 12 TROUGH AUGUST  1,  SEVERAL REPAIRS
                           WERE MADE TO  1HE LIME  SLURRY MAKE-UP SYSTEM. A DISINTEGRATOR UNIT WAS
                           INSTALLED TO  KfDUCE  PLUGGING OF  STRAINERS AND SLURRY  CONTROL VALVES.
              AFFECTED MODULES: SYSTEM

  8/73   6A                       53.0
        6B                       64.0
        SYSTEM                                                                   744

        »*  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   8/73     EGUTFMENT:  B01LER-RELAT F, D
              ENfi DATf     8/73     FSCBLfM: NOT  DEFINED/SPECIFIED
                           TH OPERATION WAS CONTINUOUS fROM AUGUST 2 TO AUGUST  18  EXCEPT FOR A  BRIEF
                           SHUTDOWN DUE  70 A BOILER-RELATED PROBLEM.
              AFFECTED MODULES: SYSTEM

        •*  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   8/73     tflUIFKENT:  THICKENER
              END DATE     8/73     PROBif>i: NOT  DEFINED/SPECIFIED
                           FUCM AUGUST 1? TO SEPTEMBER  5, TH£ SYSTEM «AS SHUT DOWN  TO REPLACE THE
                           CLARIFIER'S UhDERFLOW  LINE  WITH  ONE OF LARGER DIAMETER AND TO INSTALL
                           ADDITIONAL PUfP CAPACITY  IN  THE  CLARIFIERS'S OVERFLOW  SYSTEM.
             AFFECTED MODULES: SYSTEM

  9/7?   6A                       85.0
        6B                       72.0
        SYSTEM                                                                   720

        *»  PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   9/73     ESUI^ENT:  ABSOR6SR
             END DATE     9/73     FROBIFM: NOT  DEFINED/SPECIFIED
                    ^~~   THE UNIT OPERATED CONTINUOUSLY BETWEEN SEPTEMBER  6 AND 20 EXCEPT  FOR A
                                                 168

-------
                                               EPA  UTILITY FED SURVEY:  DECEMBER  1978 - JANUARY 1979
                                             SECTION  3
                     DESIGN  AND  PERFORMAMIE DATA  FOR  OPERATIONAL FfiO  SYSTFMS
	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY  OPERAB1LITY  PLIABILITY UTILIZATION  X REMOVAL    PER  BOILER  FGD   CAP.
                                                                   S02   PART.  HOURS HOURS  HOURS  FACTOR

                            7-HOUR SHUTDOWN TO  REPAIR A WARBLE BED SUPPORT  PLATE.
              AFFECTED MODULES: SYSTEM

       **  PROBLEMS/SQLUTIONS/COMMENTS
              START DATE    9/73     EOUIfMENT:  FED  SYSTEM, GENERAL
              END DATE      9/73     COMMtNTS:
                            THE UNIT UAS  SHUT DOWN FROM SEPTEMBER 20 TO  THE  END OF THE MONTH.
              AFFECTED MODULES; SYSTEM
10/73
        6«
        6fi
        SYSTEM
 11/73
 12/73
  2/74

  J/74

  4/7*

  5/74

  6/74

  7/74

  6/74
                         49.0
                         94.0
                                                                                 744
        *» PROBLEMS/SOLUT10NS/COMMENTS
              START  DATE   10/73     tQUIFHENT:  F6D SYSTEM, GENERAL
              END DATE     12/73     COMMENTS:
                            THE F6D SYSTEM  WAS OPERATED UNTIL DECEMBER  C0  AFTER  WHICH THE BOILER AND
                            THE SCRUBBER  PODULES WERE SHUT DOfcN BECAUSE  OF NO DEMAND (THIS IS A
                            PEAKING-LOAD  FOILER).
              AFFECTED  MODULES: SYSTEM
6A
6e
SYSTEM

6A
66
SYSTEM
                                 3S.o
                                1CO.C!
                                  44.0
                                  78.0
  1/74  SYSTEM
720


744

744
** PROBLEMS/SOLUTIONS/COMMENTS
       START  DATE   1/74      E6UIFWENT: BOILER-BELATED
       END DATE     7/74      COMMfNTS:
                    THE BOILER WAS SHUT DOWN BECAUSE  OF  NO  DEMAND.
       AFFECTED MODULES:  SYSTEM

SYSTEM

SYSTEM

SYSTEM

SYSTEM

SYSTEM

SYSTEM
        6A
        6B
        SYSTEM
                          50.0
                          77.0
672

744

720

744

720

744


744
         **  PROBLEMS/SOLUTIONS/CONMENTS                 „.,.,.„
               ST'RT DATE    6/74     EQU1FKENT:  BOILER-RELATED
               END DATE      8/74
                             UNIT HA!
               AFFECTED MODULES: SYSTEM
  9/74   SYSTEM
                                          OFf  FRE8UENTIY DUE TO FLUCTUATION  IN  POWER  DEMAND.


                                                                         720
               cun n»TF      9/74     COMMENTS:
                             T*E EOILER WAJ  SHUT  DOWN  BECAUSE OF NO DEMAND.
               AFFECTED MODULES: SYSTfcM
                                                   169

-------
    UTILITY F6D SURVEY:  DECEMBER 197f - JANUARY 1979

                                            SteTION 3
                     DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL  F6D SYSTEMS
	PERFORMANCE DATA	
PERIOD MODULE AVAIlAPUITr  OPERARIL1TY fELlABILITY UTUI7AT10N   X  REMOVAL   PER  BOILER   F6D   CAP.
                                                                  $02  PART. HOURS HOURS   HOURS FACTOR
10/7*
10/75
11/75
       6«
       66
       SYSTEM
                        100.0
                        100.0
                                                                        744
          PRObLtMS/SOLUTlONS/COKMENTS
              START  DATE   10/74     I6UIfMENT: FGD SYSTEM,  GENERAL
              END  DATE     10/74     CCMMCNTS: RESEARCH AND  DEVELOPMENT
                           BOILER TURNED ON SPECIFICALLY TO PERFORM LIMESTONE TESTS  ON  F6D  SYSTEM.
              AFFECTED  MODULES: SYSTEM
11/74   SYSTEM
                                                                               720
        **  PR06LEKS/SOLUTIONS/COMMIENTS
              START  DATE  11/74     EOUIf-MENTS B01LFR-RELA TE 0
              END  DATE      6/75     COMMENTS:
                           Tlii BOILER. WAS SHUT DOWN BECAUSE:  OF  NO DEMAND.
              AFFECTED  MODULES: SYSTEM
12/74
1/75
2/75
3/75
4/75
5/75
6/75
7/75
8/75
9/75
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
6A
6P
•SYSTEM
                                                                               744

                                                                               744

                                                                               672

                                                                               744

                                                                               720

                                                                               744

                                                                               720

                                                                               744

                                                                               744
                               100.0
                               100.0
        **  PR06LEMS/SOLUTION5/COMMEN1S
              START DATE   9/75     E8UIP«ENTs  F6D  SYSTEM,  GENERAL
              END DATE    10/75     COMMENTS:
                           THE pOILE* ANC F6D  SYSTEM  WERE OPERATIONAL ALL OF SEPTEMPER  AND  THE FIRST
                           TWO WEEKS IN OCTOBER. OPERAelLITY FOR BOTH MODULES  DURING  THE. OPERATIONAL
                           PERIOD WAS IOC PERCENT  (RASED UPON LGKE'S PEAK LOAD  DETERMINATION). 502
                           REMOVAL WAS REPORTED TO  BE OVER  98 PERCENT.
              AFFECTED MODULES: SYSTEM

        **  PROHLEMS/SOLUTIONS/COMMENTS
              START DATE   9/75     ECUIfHENT:  BOILER-RELATED
              END DATE    10/75     PROBIEM: NOT DEFINED/SPECIFIED
                           SYSTEM OUTA6E IN THE LAST  TWO WEEKS OF OCTOBER WAS  DUE  PRIMARILY TO BREECH
                           1*6 IN THE BOILER SECTION.
              AFFECTED MODULES: SYSTEM
6A
68
SYSTEM

6A
6B
SYSTEM
                               100.0
                               100.0
                               100.0
                               100.0
                                                                                744
                                                                                720
       «* PROBLEMS/SOLUT10NS/COMMENTE
              START  DATE  11/75     EQUIPMENT:  FGD  SYSTEM, GENERAL
              END DATE    12/75     COMMENTS:
                                                 170

-------
                                              EPA UTILITY FGO SURVEY: DECEMBER 1976 - JANUARY 1«?9
                                            SECTION 3
                    DESIGN  AND  PERFORMANCE  DATA FOR OPERATIONAL FGD SYSTEMS
------------------------------------------ PERFORMANCf DATA ------------------------------------------
PERIOD MODULE AVAILABILITY  CPERAEULITY  PLIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FED   CAP.
_ _____   ___    __     __          ,                               S02  PART. HOURS HOURS  HOURS FACTOR

                           THE  BOILEH ANH SCRUBBER SYSTEM R«N MOST OF THE REPORT PERIOO~ON~MONDAV-
                           FRIDAY EIASIS.
              AFFECTED  MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   11/75     E6Ulf*lENT: SCRUBBER
              END  BATE     12/75     Pfi06i.E«: NOT DEFINED/SPECIFIED
                           TVO  MINOR OUT'KES IN DECEMBER WfRE DUE TO MALFUNCTION AND REPAIR OF THE
                           DUAL STRAINER SUITCH SHAFT IN THE BOTTOM OF THE SCRUBBER MODULE.
              AFFECTED  MODULES: SYSTEM

12/75  6»                       90.0
       68                       90.0
       SYSTEM                                                                744

 1/76  6A                      100.0
       66                      100.0
       SYSTEM                                                                744

       ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    1/76     beUHMENT: F6D SYSTEM, GENERAL
              END  DATE      1/76     COMMENTS:
                           5C2  REMOVAL EFFICIENCY WAS REPORTED TO BE 99 PERCENT CURING JANUARY.
              AFFECTED  MO»ULE$: SYSTEM

 Z/76  SYSTEM                                                                696

       ** PR06LEMS/SOLUTIONS/COMMENTS
              START  DATE    2/76     t«UlfWENT: FGD SYSTeHt GENERAL
              END  DATE      2/76     COMMENTS:
                                EXTENS1VF SLUDGE STUDY;  FIXATION, LEACHATES, SEASONAL VARIATIONS.
                           SCRUBBER/SLUD FE!  STUDY SCHEDULED FOR JUNE OR JULY. THE SCRUBBER WILL NOT
                           BE OPERATED OMIL THE START OF THE STUDY PROGRAM UNLESS THE BOILER IS
                           REQUIRED FOR  LEAKING POWER DEMANDS. HIGHLIGHTS OF THE SCRUBBER/SLUDGE
                           STUDY PROGRAM ARE AS FOLLOWS.
                                6 MONTHS DURATION.
                                ONE SCHEDULED  SHUTDOWN FOR TEST MODIFICATIONS.
                                DELIBERA1E  HIGH CHLORIDE CONCENTRATION OPERATION.
                                MGO INNOtULATION.
              AFFFCTEB  W6DULES: SYSTEM

 3/76   SYSTEM                                                                7**

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   3/76     E6UIIM£NT: FGD SYSTEM, GENERAL
              END DATE     4/76     COMMIMTS:
                           T»E UNIT DID  NOT OPERATE  DURING THE REPORT PERIOD IN ANTICIPATION OF THE
                           EPA SCRUBBER/SLUDGE STUDY. THE UTILITY IS NOW  COMPLETING SYSTEM MODIFICA-
                           TIONS FOR  THE OPERATION OF THE TEST PROGRAM.
              AFFECTED MODULES: SYSTEM
4/76  SYSTIM                                                                 '

                              100.0

                                                                             "*
  5/76  6A                      100.0
        66                      100.0
        SYSTIM
        ** PROBLEMS/SOLUTIONS/COMMEN7S
              ST*«T BATS   5/76      ieUIHIINT:  F6D  SYSTEM*  6ENERAL

              END MTE     THIS  PFAKCLoIcNUN!T  WAS  OPERATED FART  Of THI  TIM  BURIN6  THE  REPORT PERIOD
                           (APPROXIMATEU  2  WEEKS  IN MAY  AND TWO  WEEKS  IN  JUNE,). THE  SCRUBBER WAS
                           AVAHABIE  TO  1HI  BOIUR  100  PERCINT  Of THE  TIM  AND  50? RWOYAL  EFFICIENCY
                           WAS 98 TO  99  S  6URINS THIS OPSRAT1N5 SEGMENT.
              AFFECTED MODULES:  SYSTEM

                                                                               7ZO
  6/7«  SYSTEM
                                                 171

-------
EPA UTILITY F&D SURVEY:  DEClMbER  197^  - JANUARY 1979
                                            SECTION 3
                     DESIGN  AND  PERFOPHAfcCE  DATA FOR OPERATIONAL FGD SYSTEMS
		._.	PERFORMANCE DATA	—•--	
PERIOD MODULE  AVAILABILITY  OPERABIL1TY  PLIABILITY UTILIZATION  % REMOVAL   PER   BOILER   FGD   CAP.
                                                                 S02  PART. HOURS  HOURS  HOURS FACTOR


 lilt  6A                      100.0
       6e                      100.0
       SYSTEC.                                                                  7*4

       •*  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    7/76     E6UIH«ENT: FGD SYSTEM, GENERAL
              END  DATE      8/76     COMMtNTS:
                           THIS UNIT WAS OPERATIONAL PART OF THE TIME DURING THE JUIY-AU6UST PERIOD.
                           THE  SCRUBBING SYSTEM WAS AVAILABLE TO THE BOILFR ON A 100  PERCENT BASIS.
                           NO MAJOR  SCRUtPER-RELATED PROBLEMS WERE ENCOUNTERED.
              AFFECTfcD  MODULES: SYSTtlt

 6/76  6A                      1CQ.O
       66                      100.0
       SYSTEM                                                                  7*4

 9/76  SYSTEM                                                                  720

       **  PSOBLEMS/SOLUTIONS/COMHENTf
              START  DATE    9/76     EGUItMENT: FGD SYSTEM* GENERAL
              END  DATE     10/76     COMMENTS: RESEARCH AND DEVELOPMENT
                           THE  UNIT  DID  NOT OPERATE THROUGHOUT SEPTEMBER AND THE FIRST  3  WEEKS IN
                           OCTOBER.  THE  &PA-FUNDED SCRUBBER/SLUDGE STUDY PROGRAM COMMENCED  OCTOBER  25
                           THE  INITIAL PMSE OF THE PROGRAM CALLS FOR OPERATIONS TO  PROCEED  FOR A 20
                           TO 30-DAY PERIOD WITH CARBIDE LIME SCRUBBING APSORBENT. FOLLOWING COMPLE-
                           TION OF  THIS  KIN, THE UNIT WILL BE SHUT DOWN AND MODIFICATIONS WILL (SI
                           INCORPORATED  INTO THE SYSTEM FOR OPERATION WITH COMMERCIAL 6RADE  (HISH
                           CALCIUM)  LIME .
              AFFECTED  MODULES! SYSTEM

10/76  S»STEM                                                                  7*4

11/76  6A                       99.0
       6P                       99.Q
       SYSTEM                                                                  720

       **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   11/76     EGUIPMENT: FGD SYSTEM, GENERAL
              END  -OA-TE     12/76     CfHMfNTS: RESEARCH AND DEVELOPMENT
                           TdE  UNIT  WAS  IN SERVICE BURINS THE REPORT PERIOD. THE SCRUBBING  SYSTfM
                           OPERATED  99.5 PERCENT OF THE TIME THE BOILER WAS IN SERVICE  CARBIDE LIME
                           WAS  EMPLOYED  'S THE 502 ABSORBENT. THE HIGH CA CIUM (VIRGIN) LIME RUN,
                           SCHEDULED AS  FART OF THE SCRUBBER/SLUDGE STUDY, WILL  COMMENCE  ON  MARCH 1,
                           1*77.
              AFFECTED  MODULES: SYSTEM

12/76  6A                       99.0
       6B                       99.0
       SYSTEM                                                                  7«4

 1/77  SYSTEM                                                                  7«4

       **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    1/77     ECU1FMENT: FGD SYSTEM, GENERAL
              END  DATE      2/77     COHMfNTS:
                           BECAUSE  OF SEVFRE WEATHEP CONDITIONS THERE WERF NO  BOILER  OPERATIONS AND
                           NC SCRUBBER OFERATIONS UNTIL MARCH 15, 1977.
              AFFECTED  MODULES: SYSTtM

 2/77  SYSTEM                                                                  672

 3/77  SYSTEM                                                                  744

 4/77  SYSTEM                                                                  720

 5/77  SYSTEM                                                                  744
                                                172

-------
                                              EPA UTILITY F6D SURVEY: DECEMBER 1976 - JANUARY 1"579
                                            SECTION 3
                    DtSIGN  AND  PERFORMANCE DATA FOR OPERATIONAL FGD SYSTEMS
............. ------------------ ..__ ------ -PERFORMANCE BAT A ----------- - ---------- - -------------------
PERIOD MODULE AVAILABILITY  OPERARILITY RELIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FED   CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR


       •* PROBLEMS/SOLimONS/COMMENTS
             START  DATE    5/77     EQUIPMENT: F6D SYSTEM, GENERAL
             END  DATE      5/77     COHM1NTS: RESEARCH AND DEVELOPMENT
                           IK MID MARCH Ifi&E BEGAN TESTS FOR EPA WITH REGULAR LIME SINCE ONE OF THE
                           OBJECTIVES OF THE TEST WAS TO DETERMINE WHpTHER THERE WERE APPRECIATE
                           DIFFERENCES BtTWEEN REGULAR LIME AND CARBIDE LIME AT THIS FACILITY. CURING
                           OPERATION U'lTh REGULAR LIME, SCALING PROBLEMS OCCURRED, INDICATING THAT TH
                           SCALING RESULlfD FROM INCREASED OXIDATION LEVELS. AVAHAFILF OPTIONS FOR
                           CONTROLLING SCALING WERE LIMITED BY THE FIXED DESIGN FEATURES OF THE SCRUB
                           PfcR HARDWARE. THE OPTION SELECTED WAS ADDITION OF MGO TO  THE SCRUBBING
                           MEDIUM. WHEN CEO WAS ADDED, THE SCALING PROBLEM WAS ELIMINATED, ALLOWING
                           COMPLETION OF THE TEST PROGRAM.
             AFFECTED  MODULES: SYSTEM

  6/77   s»STE«                                                                 720

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    6/77     E6UIFHENT: F60 SYSTEM, GENERAL
              END DATE      8/77     COMMENTS: RESEARCH AND DEVELOPMENT
                          THE  SCRUBBER/SIUDGE EVALUATION STUDY CONTINUED DURING THE  PERIOD.  THE
                           SCRUBBER FLAN1 (ONE MODULE IS BEING UTILIZED FOR THIS EXPERIMENTAL PROGRAM
                           WAS  IN SERVICE ON A VIRTUALLY CONTINUOUS BASIS FROM JUNE  18 TO AUGUST 8
                           OPERATING  CN fAGNESIUM INNOcULATFD COMMERCIAL LIME. SYSTEM OPERABIL1TY
                           DIRIN6 THIS PFRIOD WAS APPROXIMATELY 96X. 502 REMOVAL EFFICACY WAS
                           MEASURED IK EHESS OF 99. 5X, THfc SYSTEM WAS SHUT DOWN AT  THIS POINT TO
                           PERFORM  A  NUMbfR OF SCHEDULED MODIFICATIONS TO THE SYSTEM FOR TEST PUR-
                           PCSES. SPECIFICALLY, MODIFICATIONS ARE BEING IMPLEMENTED  TO THE SYSTEM IN
                           ORDER TO BYPASS  THE REACTION TANK IN ORDER TO CONDUCT A SHORT TERM HFTFN-
                          T1CN  TIME TEST.   THE TESTING HAS COMPLETED IN AUGUST *77  AFTER THE MODIFI-
                          CATIONS WERE MODE.
              AFFECTED MODULES:  SYSTEM

  7/77  SYSTEM                                                                744

  8/77  SYSTEM                                                                744

  9/77  SYSTEM                                                                72°

        ** PROBLEMS ASOLUTI ON S/COMMENTS
              START DATE    9/77      E8UIFMENT:  BOILER-RELATF C
              END DATE      3/78      COMMENTS;
                            THE UNIT IS  CIRRENTLY  NOT  OPERATING  DUE  TO THE  LACK  OF  POWER  REQUIREMENT.
              AFFECTED MODULES:  SYSTEM

  10/77  SYSTEM                                                                 74*

  11/77  SYSTEM                                                                 7ZO

  13/77  SYSTEM                                                                 7U

  1/78  SYSTEM                                                                 7*4

  Z/78  SYSTEM                                                                 672
                                                                               744
  3/78  SYSTEM
*/78  SYSTEM

      **
           PROBLEMS/SOLUTIONS/COMMENTS
               START  DATE    4/78     EOUIH*ENT: BOILE R-RE»-ATE 0
  5/78  SYSTEM
                            F«»!v-S »SS"S«"M LINE ONLY A FEW HOURS DURING THIS PERIOD. NO OPERATION*
                            PROBLEMS WERE REPORTED BY THE UTILITY.
               AFFECTED  MODULES: SYSTEM

                                                                                744
                                                 173

-------
FPA UTILITY  fee  SURVEY: DECEMBER 197f"  -  JANUARY 1979
                                             SECTION 3
                     DESIGN AND PERFOPMAKE  DATA  FOR OPERATIONAL F6D SYSTEMS
	PERfORMANCF D AT A	*	~"
PERIOD  MODULE  AYAILAPIL1TY OPERABIL1TY  MLLIABILITY  UTILIZATION  X REMOVAL    PER   BOILER  FGO    CAP.
                                                                  SC2   PART.  HOURS HOURS  HOURS  FACTOR


 6/7E   SYSTEM                                                                   720

        **  PR06LEMS/SQLUTIONS/COMMENTS
              START DATE   6/78      t «UI F'MENT:  601LER-RfLATt0
              END DATE     7/78      COKMtNTS:
                           THE UMT  RAK  INTERMITTENTLY FOR ABOUT EI6HT TO TEN  DAYS  OVER THIS PERIOD.
              AFFECTED MODULES: SYSTEM

 7/7B   SYSTEM                                                                   744

 8/78   SYSTEM                                                                   74*

        **  PR06LEHS/SOLU7IONS/COMMENTS
              START DATE   8/78      EGLIlfENT:  THICKENER
              £N0 DATE     9/78      COMMI-NTS:  RESEARCH AND DEVELOPMENT
                           THIS UNIT  WAS  OPERATED  FflR  TUO WEEKS IN SEPTEMRER  SO  THAT TESTING OF  A NEW
                           FLOCCULANT COILD  BE  CARRIED OUT. THE RESULTS OF THESE  TESTS WILL DETERMINE
                           THE TYPE  OF  FIOCCULANT  THAT WILL £E USED IN THE FUTURE AT THE OTHER  16«£
                           UNITS.
              AFFECTED MODULES: SYSTEM

 9/78   SYSTEM                                                                   720

TO/7R   SYSTEM                                                                   744

        **  PROBLEMS/SOLUTIONS/CCMMENTS
              START DATE  10/78      E6UIFHENT:  601LFR-RELA TF D
              END DATE    11/78      CdMMINTS:
                           THE BOILER WAt NOT  OPERATED DURING OCTOBER  OR NOVEMBER.
              AFFECTED MODULES: SYSTEM

11/7*   SYSTEM                                                                   720

12/78   SYSTEM                                                                   744            n

        **  PROHLEMS/SOLUTIONS/COMMENTS
              START DATE  1?/7S      E6UII'»ENT:  F6D  SYSTEM, GENERAL
              END DATE     1/79      COKMlNTSi
                           THE UNIT  UAS  KOT  OPERATED DURING DECEMBER OK JANUARY.
              AFFECTED MODULES: SYSTEM

 1/79   SYSTEM                                                                   744            „
                                                 174

-------
                                             EPA UTILITY  FGO SURVEY:  DECEMBER  1*76  -  JANUARY  1979
                                           SECTION J
                    DESIGN  AND PERFCPMAfvCE DA T A FOR OPERATIONAL  FED SYSTFMS
COMPANY NAMt
PLANT NAMF
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE  EMISSION  LIMITATION -
SO2 EMISSION  LIMITATION - NG/J
NfT PLANT GENERATING  CAPACITY - Mw
GROSS UNIT GENERATING C»PAClTV - Mfc
NET UNIT C-ENERATIMG CAPACITY WF6D - * V
NET UNIT GENERATING CAPACITY VO/FGC> - H;
E6UIVALFNT SCRUUBFD CAPACITY - MW

** BOILER  DATA
    SUPPLIER
    TYPF
    SERVICE  LOAD
    COMMERCIAL  SERVICE DATt
    MAXIMUM  BOILER FLUE GAS FLOW - CU.»/S
    FLUE GAS TEMPERATURE - C
    STACK  HEIGHT - M
    STACK  TOP 01AI"ETtR - M

*«  FUEL  DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE  HEAT CONTENT - KJ/KG
     RANGE  HtAT  CONTENT - BTU/Lt
     AVERAGE  ASM CONTENT -  *
     RANGE  ASH CONTENT  - X
     AVERAGE  MOISTURE CONTE.KT  - *
     RANGE  MOISTURE CONTENT -  *
     AVERAGE  SULFUR CONTENT -  *
     RANGE  SULFUR CONTENT - X
     AVERAGE  CHLORIDE CONTENT  - X
     RANGE  CHLORIDE CONTFNT -  X
     FUEL  FIRING RATE - M T/H
     FUEL  FIRING RATF. - HW

 ** ESP
     NUMPER
     SUPPLIER
     PARTICULATE DESIGN REHCVAl EFFKIEKY

 *« FGD SYSTEM
     SALEABLE PRODUCT/THROWAW AY PRODUCT
     GENERAL  PROCESS  TYPE
     PROCESS  TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEb/RF.TROFlT
     PARTICULATE DESIGN REMCVAl EFF]C1E^CY
     S02 DESIGN  REMOVAL EFFICIENCY  - X
     COMMERCIAL  DATE
     INITIAL  START-UP
     CONSTRUCTION  INIT1ATIOK
     CONTRACT AWARDED

 ** ABSORBER
     NUMBER
     TYPE
     INITIAL  START  UP
     L/G RATIO  - L/CU.M
     PARTICULATE 1NLFT  LOAD - E/CU.f
     S02 INLET  CONCENTRATION - PPM
     S02 OUTLET  CONTRATION  - PPK
     S02 DESIGN  REMOVAL EFFICIENCY - X

 ** CENTRIFUGE
     NUMBER
    M1NNKOTA POWER COOPERATIVE
    MILTON R. YOUNG
    2
    CENTfR
    NORTH DAKOTA
    B
    ******         (****** LB/MMBTU)
      516.         (  1.200 LB/MMBTU)
      690.0
      477.0
      408.0
      417.0
      405.0
    BA6COCK ANt H1LCOX
    CYCLONE FIRED
    BASE
     0/77
      955.90
      179.4
      168.
    *******
- X
               (2021400 ACFK)
               t 355  F)
               ( 550  FT)
               (*«***  FT)
    COAL
    LIGNITE
      15119.

    ********
    5-8
       3S.OO
    ******
          .70
    ******
    ********
    ******
    *******
    *****
               <  6500 BTU/LB)
                ******
               (*** TPH)
     UHFELAGRATOR-FRYE
        99.6
THROVAWAY PRODUCT
UET SCRUBBING
LIMEVALKALIKE FLYASH
ADI/COMBUSTION EQUIP ASSOCIATE
SANOFRSON It PORTER
FULL-SCALE
NEW
   99.60
   75.00
 6/78
 9/77
 9/75
 4/75
     SPRAY TOWER
      6/77
        10.7
          .0
      1900
       475
        75.0
                <  80.0  GAL/1000ACF)
                C   .005 GP/SCF)
 ** FANS
     NlW
     TYPE
     BOILER l.D.
                                                 175

-------
FPA UTILITY  FED SURVEY: DECtKbFR  197f  - JANUARY 1979
                                             SECTION  3
                     DESIGN  AND  PERFORMANCE DATA  FOR OPERATIONAL FGD SYSTfMS
     FANS
      NUMBER
      TYPF

     VACUUM FILTER
      NUHPER
      TYPF
      CAPACITY - M T/D
      OUTLET SOLIDS - X
B01LFR l.D.  (SPARE)
ROTARY DRUM
   45.3         (   50 T/D)
   60.0
     MIST ELIMINATOR
      TYpE

     TANKS
      SERVICE

      RECYCLE/Fit ACT ION

     REHEATER
      TYpE
      TEMPERATURE  BOOST  - C

     THICKENER
      CONSTRUCTION  MATERIAL
      OUTLET SOLIPS  - Z
CHEVRON


NUMBER

   Z
BYPASS
   13.9         «   25 F)
CONCRETE  WITH  POLYETHYLENE  COATING
   40.0
     WATER LOOP
      TYpF                                         OPEN
      FRESH MAKEUP  WATER ADDITION - LITFRS/S         **.l

     DISPOSAL
      NATURE                                       FINAL
      TYPE                                         MINEFILL
      LOCATION                                     OFF-SITE
      TRANSPORTATION                               TRUCK
                (  700 6PM)
 	PERFORMANCE DATA	
 PERIOD MODULE  AVAILABILITY OPERABIL1TY  FfLIABlLITY UTILIZATION   Z  REMOVAL   PER  BOILER   FGD   CAP.
                                                                    S02  PART. HOURS HOURS   HOURS FACTOR
  9/77  SYSTEM
                                                                                 720
        ** PROBLEM-S/SOLWTIONS/CCMMEN1S
               START DATE   9/77      ECUirKENT: FED SYSTEM.  GENERAL
               END DATE     9/77      COBCUNTSs
                            THE UTILITY  Rf.PORTED INTERMITTENT  OPERATION SINCE INITIAL  START-UP.
               AFFECTED MODULES:  SYSTEM

        »• PROBLEMS/SOLUTIONS/COMMENTS
               START DATE   9/77      EQUIFPENT: PIPING
               END DATE     9/77      PROBIFM: WEATHER-RELATED  COMPONENT FAILURE
                            MAJOR OPERATIONAL PROBLEMS HAVE  OCCURRED AS A RESULT  OF  SEVERE WINTER
                            WEATHER  CONDITIONS. PARTICULARLY NUMEROUS INSTANCES OF  FROZEN AND RUPTURED
                            LINES.   THE  S^STEK WAS SHUT DOWN DURING  THE FIRST PART  OF  THE MONTH OF
                            DECEMBER  TO  IfSTALL HEAT TRACING IN  THE  LIOUID CIRCUIT.
               AFFECTED MODULES:  SYSTtM

        ** PhOeLEMS/SOLUTIONS/COMMENTS
               START DATE   9/77      EflUlfWENT: INSTRUMENTATION
               END DATE     9/77      F-POBU H; MECHANICAL-RELATED COMPONENT FAILURE
                            SOME  MINOR  PRCHLF.HS HAVE OCCURRED  WITH THE FLOW  METERS  (R OTAHET E R S) .
               AFFECTED MODULES:  SYSTEM

        «* PROBLEMS/SOLUTIONS/COMMENTS
               START DATE   9/77      ECUIFfENT: GAS DAMPER
               END DATE     9/77      PROBLEM: MECHANICAL-RELATED COMPONENT FAILURE
                            SOME  MINOR  PRCPLEMS HAVE BFEN REPORTED WITH THE  SYSTEM'S GUILLOTINE  6AS
                            DAMPtRS.
               AFFFCTED MODULES:  SYSTEM
 10/77  SYSTEM
                                                  176

-------
                                               EPA UTILITY FGD SURVEY: DECEMBER  1978  - JANUARY 1?79
                                             SECTION  3
                     DESIGN  AND  PERFORHAI\CE DATA  FOR OPERATIONAL FGO SYSTEMS
   "	PERFORMANCE  DATA	.	
PERIOD MODULE  AVAILABILITY  OPERABILITY (^LIABILITY  UTILIZATION  X REMOVAL   PER   BOILER   FGD   CAP.
                                                                   S02  PART.  HOURS  HOURS  HOURS FACTOR
        **  PROBLEMS/SOLUTIONS/COfmENTS
              START DATE   10/77     EQUIPMENT:  FGD  SYSTEM, GENERAL
              END DATE;     11/77     PROBLEM: WEATHER-PELATED COMPONENT FAILURE
                            WCSK CONTINUED ON INSTALLATION OF ELECTRICAL HFAT  TRACING  ON SLURRY LINES
                            AND WATER FIP1M6.
              AFFECTED MODULES: SYSTEM

11/77

12/77   SYSTEM                                                                   m

        **  PROaLEMS/SOLUTIONS/COMMENTS
              START DATE   12/77     ECUIF^ENT:  BOlLER-RELATED
              END DATE      1/78     COMMENTS:
                            TfcERE WAS AN  t.FERGENCY  SHUTDOWN ON DECEMBER 5 AS A  RESULT  OF BEARING DAM-
                            AGE WITHIN THE TURBINES.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLU1IONS/COMMENTS
              START DATE   12/77     EOUIFMENT:  FGD  SYSTEM, GENERAL
              END DATE      1/78     COMMENTS:
                            A COMPLIANCE  TEST ORIGINALLY SCHEDULED TO BE WITHIN  THIS  PERIOD  HAS PEEN
                            TENTATIVELY RESCHEDULED  WITH THE EPA fOR THE END OF  MARCH. THE  UNIT IS
                            TO HAVE THE SYSTEMS  IN  EQUILIBRIUM (WATER BALANCE).
              AFFECTED MODULES: SYSTEM

  0/78   A           92.3         28.0                     22.2
        B           28.5         25.9                     20.*
        SYSTEM      46.0         53.0         54.0        42.0                   876    692         66.7

  1/78   SYSTEM                                                                   744

  2/78   SYSTEM                                                                   672

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    2/78     E6UIKPENT:  FGO  SYSTEM, GENERAL
              END DATE      3/78     COMMENTS:
                            BCTH THE EOILtR  AND  FGD  SYSTEM C A I»E BACK ON LINE  FEBRUARY 21 AFTER COM-
                            PLETION Of TH£- TURBINE  REPA IRS. THE COMPLIANCE  TEST  HAS  AGAIN BEEN" RE-
                            SCHEDULED WITf EPA  FOR  THE END OF MAY.
              AFFECTED MODULES: SYSTEM

        *«  PROBLEMS/SOLUTIONE/COMMENTS
              START DATE    2/78     E6UIFMENT:  FAN
              END DATE      3/78     PPOBUM: MECHANICAL-RELATED COMPONENT  FAILURE
                            ONE  FORCED-DRAFT FAN CUPSTREAM OF THE  FED  SYSTEM)  HAD AN OIL LEAK AND A
                            SHAFT ALI6NM.EM  PROBLEM.  THE  FAN HAS  TAKEN OFF LINE AND SHIPPED  TO
                            BUFFALO FORGE  FOR REPAIRS.  THE AFFECTED MODULE WAS DOWN FROM FEBRUARY  2?
                            THROUGH APRIL  10, WHEN  THE REPAIRED UNIT WAS  RE-INSTALL ED.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COPIMENTS
              START DATE    2/78     E6UIFMENT:  VACUUM FILTER
              END DATE      3/78     PROBiEn: MECHANICAL-RELATED  COMPONENT  FAILURE
                            ThE  VACUUM  FILTER MALFUNCTIONED,  ALLOWING  LARGER SIZE PARTICLES  TO ESCAPE
                            THE  FILTER.   THIS CAUSED THE  RUBBER LINING DOWN STREAM TO  PEEL WHICH, IN
                            TURN, CREATED  A  PLUGGING PROBLEM.   EIMCO ENGINEERS ARE PRESENTLY  STUDYING
                            THE  PROBLEM  A HI)  HOPE TO INCORPORATE MODIFICATIONS TO IMPROVE THE  PERFOR-
                            MANCE OF THE  FILTERS.
              AFFECTED MODULES: SYSTEM

  3/78   SYSTEM                                                                    7**

  4/78   SYSTEM                                                                    72°

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    4/78     ECUIf«ENT:  F6D SYSTEM.  GENERAL
              END DATE      7/78     CCMHtNTS:


                                                  177

-------
FPA UTILITY  FGD  SURVEY: DECEMBER  197P  -  JANUARY 1979
                                             SECTION 3
                     DESIGN AND PERFORMANCE  DATA FOR OPERATIONAL  FGD SYSTEMS
	PERFORMANCE OAT A	
PERIOD  MODULE  AVAUA8ILITY CPERAP1L1TY  i-rLlAHILlTY UTILIZATION   X  REMOVAL   PER  BOILER   F€D   CAP.
                                                                   S02  PART. HOURS HOURS  HOURS FACTOR

                           COMPLIANCE  TEJT1N6 TOOK PLACE DURING  THE WEEK OF JUNE !> .   THE  REPORT
                           SHOULD  BE  AVAILABLE  TO THE UTILITY  DY THE END OF JUNE.
              AFFECTED MODULES:  SYSTEM

        ** PROGLEMS/SOLUTIONS/COMMENTS
              START DATE   A/78      ECUIf^ENT:  GAS DAMPER
              END DATE     7/78      PROBLEM: DESItN-RELATED  UNDERSIZED COMPONENT
                           T*E  UNIT  MS  tOWN WITH DAMPER PROBLEMS 
-------
                                                EPA UTILITY  fCl SURVEY: DECEMBER  1978 - JANUARY  1979
                                              StCTION 3
                     DESIGN AMD PERFORMANCE  DATA FOR OPERATIONAL F6D SYSTEMS
	PERFORMANCE  DATA	.	.	
PiRIOD  MODULE AVAILABILITY OPEPAB1L1TY  FEHA6ILITY  UTILIZATION  X REMOVAL    PER  BOILER  F6D    CAP.
                                                                    SC2   PART.  HOURS HOURS  HOURS  FACTOR

                            F.D.  FAN  PROBLEMS HAVE  CONTtNUED AND HAVE BEEN  A  MAJOR CONCERN.
              AFFECTED  MODULES:  SYSTtK

11/7B   SYSTEM                                                                    72Q

12/78   SYSTEM                                                                    744

  1/79   SYSTJK                                                                    744

        ** PROQLEMS/SOLUTIONS/CCMMENTS
              START  DATE   1/79      ICUIf'KENT:  FAN
              £«D  BATE      1/79      PPOBIEH: COMPONENT  FAILURE, OTHER
                            DIE  TO A  FnILlRE Of  A  FORCED DRAF1 FAN MOTOR 3  MODULE UAS DOUN AND UNIT
                            WAS  AT HALT I CAD.
              AFFECTED  MODULES:  B

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  BATE   1/79      EBUIfMENT:  ABSORBER
              END  DATE     1/79      COCMINTS:
                            WHILE THE  FAN MOTOR  UAS BEING REPAIRED THE  HOLES  IN THE P TOWER WERE
                            REPAIRED.
              AFFECTED MODULES:  b

        ** PROBLEKS/SOLUTIONS/COMWENTS
              START  DATE   1/79      E«UIFt*EWT:  ABSORBER
               END  DATE     1/79      PROPlEM! WEATHER-RELATED COMPONENT FAILURE
                            FREEZING KEATfER PRESENTED START UP  DIFICULTY.
               AFFECTED MODULES:  A

        ** PROBLEKS/SOLUTIONS/COMWENTS
               START DATE   1/79     E6U1 tf
-------
•PA  UTILITY F6D SURVEY: DECEMBER 197P - JANUARY 1979
                                           SECTION 3
                    DESIPN AND PERFORMANCE &ATA FOP OPERATIONAL  FGD  SYSTEMS
 COMPANY NAKE
 PLANT NAME
 UNIT NUMBER
 CITY
 STATE
 RfSULATORY CLASSIFICATION
 PART1CULATE EMISSION LIMITATION - NG/4
 S02 EMISSION LIMITATION -  H6/J
 NFT PLANT GENERATING CAPACITY - MW
 GROSS UNIT GENERATING  CAPACITY - MH
 NET UNIT GENERATING CAPACITY W/FGD -  Ml
 NET UNIT GENERATING CAPACITY WO/F60 -  W
 EQUIVALENT SCRUBBED CAPACITY - MM

 • * BOILER  DATA
     SUPPLIER
     TYPE
     SERVICE LOAD
     COMMERCIAL  SERVICE  DATE
     MAXIMUM BOILER  FLUE GAS  FLOW - CU.P/S
     fLUE GAS TEMPFRATURE  - C
     STACK  HEIGHT  -  M
     STACK  TOP  DIAMETER  -  M

 ** FUEL  DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT  CONTENT  - KJ/K6
     RANGE  HEAT  CONTENT  -  P1U/LE)
     AVERAGE ASH CONTENT - J
     RANGE  ASH  CONTENT  - X
     AVERAGE MOISTURE CONTENT  - X
     RANGE  MOISTURE  CONTENT -  *
     AVERAGE SULFUR  CONTENT -  X
     RANGE  SULFUR  CONTENT  - X
     AVERAGE CHLORIDE CONTENT  - X
     RANGE  CHLORIDE  CONTENT -  X
      FUEL  FIRING RATF - M  T/H
      FUEL  FIRING RATE - Nkl

 •* PARTICULATE  SCRUBBER
     NUMPEfl
      TYPE
     SUPPLIER
      SHELL  MATERIAL
     LINING  MATERIAL
     INTERNAL MATERIAL
     BOILER LOAD/SCRU6BIR  - X
     FLUE GAS TEMPERATURE  - C
     L/6  RATIO  - LITER/CUtM
     PRESSURE DROP - KPA
     S02  INLET  CONCENTRATION  - PPM

 ** F6D SYSTtfl
     SALEABLE PRODUCT/THROW AWAY PRODUCT
     GENERAL PROCESS TYPE
     PROCESS 1YPE
     PROCESS ADDITIVES
     SYSTEM  SUPPLIER
     A-£  FIRM
     DEVELOPMENT LfVFL
     NEW/RETROFIT
     COMMERCIAL  DATE
     INITIAL START-uP

 *« ABSORBER
     NUMBER
     TYPE
     INITIAL START UP
     SUPPLIER
     NUMBER OF  STAGES
     SHELL  MATERIAL
     SHELL LINER MATERIAL
     L/G  RATIO  - L/CU.M
     SUPFRFICAL  GAS  VELOCITY  - M/SEC
     PARTICULATE REMOVAL EFFICIENCY  -  X
MONTANA POWER
COLSTRIP
1
COLSTRjP
MONTANA
A
***** *
  516.
* ******
  J60.0
  730.0
  343.0
  36(1.0
******
* *****
BASE
* * /**
* *******
*******
  152.
*******
COAL
SUBBITUMINCUS
 20569.

    P.60
6.1-12.6
   23.90
******
      .77
0.4-1.0
***** ***
******
*******
*****
(****** LR/MM8TU)
(  1.200 LB/MMBTU)
(*«*,**** ACFfl)
(*«**  f)
<  500  FT)
(*****  FT)
(  8843 BTU/LP)
 8.162  KIN
(*** TPH)
VARIABLE THROAT VENTURI
COMBUSTION  EQUIPMENT ASSOCIATES
CARBON STEFL
ABRASION RESISTANT BRICKS  IN  THROAT
216 SS OR AREAS OF PLUMB BOB
   3J. 1
   4P.9         <  120  F)
    2.0         <1!.0 GALMOOCACF)
    4.2         (   17  lN-H2o>
  BOO.000
THROWAWAY  PRODUCT
WET SCRUBBING
LIME
ALKALINE  FLVASH
ADL/COMBUSTION  EOU3P  ASSOCIATE
BECHTEL
FULL-SCALE
NEW
11/75
 9/75
SPRAY  TOWER
  9/75
COMBUSTION  EQUIPMENT  ASSOC.
     1
CARBON STEEL
GLASS  FLAKE POLYESTER
     ?.4         (  16.C  GAL/1000ACF)
     2.7         <   9.0  FT/S)
    99.5
                                                180

-------
                                          SECTION 3
                   DESIGN AND PERFORMKCE OAT* FOR OPERATIONAL  FGD SYSTEMS
    SOZ INLET CONCENTRATION -N6/J
    $02 INLET CONCENTRATIOk -NG/J

** FANS
    NUMBER
    TYPE
    CONSTRUCTION MATERIALS

** HIST ELIMINATOR
    TYPE
    CONSTRUCTION MATERIAL
    CONFIGURATION
    NUMBER OF PASSES
    WASH SYSTEM
    SUPERFICIAL GAS  VELOCITY  -  M/S

** PROCESS CONTROL CHEMISTRY
    CONTROL  VARIABLES

** -PUMPS'                        •-   •
    SERVICE
     ABSORBER/VENTURI
     ABSORPER/VENTURI  fSPARE)
     WASH  TRAY
     WASH  TRAY (SPARE)
     RECYCLE  TANK  TO THICKENER
     SLUD6E  TO POND
     POND  WATER RETURN

 ** TANKS
     SERVICE
     VENTURI/ABSORPER RECYCLE TANK
     CLEAR WATER TRAY RECYCLE TANK

 ** REHEATER
     TYpf
     HEATIN6 MEf|IUI«
     TEMPERATURE BOOST • C

 ** THICKENER
               (•**** 18/MNBTU)
               (  260 LB/MW6TU)
FGD 1.0.
CARBON STEELt RUBBER LINED CASING
CHEVRON
NOREL PLASTIC
HORIZONTAL
    4
INTERMITTANT WASH BOTH TOP AND BOTTOM  OF  MIST  fL
    2.7        (  8.7 FT/S)
SO?, PHi PERCENT SOLIDS
NUMBER
 ** WATER LOOP
     TYPE
   2
   1
   Z
   1
****
****
****
NUMBER

   3
   1
IN-LINE
STEAK
   37.8
 CLCSFB
(    68  F>
 ** DISPOSAL
     NATURE
     TYPE
     LOCATION

 ** DISPOSAL
     NATURE
     LOCATION
     TRANSPORTATION
 INTERIM
 LINED  POND
 ON-SITE
 FINAL
 OFF-SITE
 PIPE
PERIOD
9/75
10/75
11/75
12/75
1/76
2/76
	 ___..._..........—.. 	 ...... — PERFORMANCE DATA 	 	 	 	 	 ..... — — — __ — -------
MO.DULE AVAILABILITY OPERABIL1TY LIABILITY UTILIZATION ^JWjm^ ^ 10 111. .Jj^ "^
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM 90.0
SYSTEM 98.0
720
744
720
744
744
696
720
456
576
720
672
624
1.0
19.0
42.0
60.0
64.0
65. C
                                               181

-------
EP» UTILITY  F60 SURVEY:  DECEMBER 1 SYSTEM,  C-ENERAL
               END  DATE    10/76      COKWII^TS;
                            A TEfPERATURE EXCURSION RESULTED l« DAMA6E TO SYSTEM COMPONENTS  CAUSIM6
                            StSTFM  DOWNTI >'E .
               AFFECTED MODULES:  SYSTEM

        ** PRObLEMS/SOLUTIONS/COMMENTS
               START  DATE  1Q/76      EOUIFMENT: F6D SYSTEM,  GENERAL
               END  DATE    10/76      PPOBlEw: NOT OEFINED/SPFCIf]ED
                            THE EPERGtNCY SCRUBBER QIJENcH  WATtR SUPPLY SYSTEM fAILED TO OPERATE
                            DURING  A  TEMPERATURE EXCURSION.
               AFFECTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
               START  DATE  10/76      tOUIFKEN1: ABSORBER
               END  DATE    12/76      PPOBlEH: NOT DEFINED/SPECIFIED
                            The LININGS  WIPE DAMAGED DURING  A TEMPERATURE EXCURSION.
               AFFECTED MODULES:  SYSTEM

        •* PROBLEMS/SOLUTIONS/COMHENTS
               START  DATE  10/76      E«UIf*ENTs HIST ELIMINATOR
               END  DATE    12'?6      PROBLEM: NOT DEFINED/SPFCIFIED
                            HIST  ELIMINATOR  DAMAGE OCCURFO AS THE RESULT OF  A TEMPERATURE  EXCURSION
                            IK OCTOBER.
               AFFECTED MODULES:  SYSTEM
 11/76  SYSTEM
                     63.0
720   720
56.0
        ** PROBLEMS/SOLUTIONS/COMMENTS
               START DATE  11/76      EOUIICENT:  FAN
               END DATE    12/76      PROBLEM: NOT DEFINED/SPECIFIEB
                            A  FAILURE OF  AN ID fAN MOTOR
               AFFECTED MODULES:  SYSTEM
12/76
1/77
2/77
3/77
4/77
5/77
6/77
7/77
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
74.0
93.0
95.0

87.0
85.0
87.0
65.0
744
744
672
744
720
744
720
744
744
744
480

600
624
672
696
67. C
73.0
3-0

SO. (I
64.0
69.0
72.0
                                                   182

-------
                                              EPA UTILITY FfiD SURVEY:  DECEMBER 1978 - JANUARY  1979
                                            SECTION 3
                    DES16N AND PERFORMANCE  DATA FOR OPERATIONAL  F6D  SYSTEMS
PERIOD
,<
8/77
9/77
10/77
11/77
12/77
1/78
2/78
3/78
4/7E
5/78
	 PERFORMANCE DAT* 	 	 	 	 	
MODULE AVAILABILITY OPERAniLITY RELIABILITY UTILIZATION X REMOVAL PER BOILER F6D CAP.
S02 PART. HOURS HOURS HOURS FACTOR
SYSTEW
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
93.0
93.0
96.0
96.0
98.0
96.0
100.0
9?,0
100.0
66.0
744
720
7**
720
744
744
672
744
7?0
744
       •t PRO&LEMS/SOLUTIONS/COMNENTS
             STAP-T  BATE    5/7R     EfiUI FKENT:  BOILER-RELATED
             £NO  DATE      5/7E     COMKfcNT: PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTA6E
                           THE UNIT MAS  HESTARTED  AFTER ITS ANNUAL OVERHAUL DURING HAY.
             AFFECTED  MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE    5/78     IGUIIMINT:  FAN
             END  DATE      5/78     CCKW!WTS:
                           THE !.D. FAN  fOTOR  WAS  NOT AVAILABLE DURING UNIT RESTART*
             AFFECTED  MODULES: 1A

 6/78  SYSTEM       76.0                                                        720

 7/78  SYSTEM       96.0                                                        7**

 8/78  SYSTEM       97.0                                                        7**

 9/7?  SYSTEM       96.0                                                        7ZO

10/76  SYSTEM       95.0                                                        744

11/78  SYSTEM       91.0                                                        72°
                                                 183

-------
EP* UTILITY  F&t SURVEY: DECEMBER  1
-------
                                           EPA UTILITY FGD SURVEY! »EcEMeE» 1978 - JANUARY 1«79
                                         SECTION 3
                  DSS16N AND PERFORMANCE DATA FOR OPERATIONAL F6D SYSTEMS
    S02 INLET CONCENTRATION -N6/J
    SOZ INLET CONCENTRATE -N6/J

*« FANS
    NUMBER
    TYPE
    CONSTRUCTION MATERIALS

** MIST ELIMINATOR
    TVPF.
    CONSTRUCTION MATERIAL
    CONFIGURATION
    NUMBER  OF PASSES
    UASH  SYSTEM
    SUPERFICIAL  GAS  VELOCITY  - W/S

*« PROCESS  CONTROL CHEMISTRY
    CONTROL VARlAPLfS

»'• pUMpS
    SERVICE

    ABSORBER/VENTURI
    ABSORBER/VENTURI (SPARE)
    UASH  TRAY
    UASH  TRAY  (SPIRE)
    RECYCLE TANK TO  THICKENER
    SLUDGE  TO  POND
    FOND  WATER  RETURN

 ** TANKS
    SERVICE
    VENTURI/ABSORBER RECYCLE TANK
    CLEAR UATER TRAY RECYCLE TANK

** REHEArER
    TTpE
    HEATING MEoIUW
    TEMPERATURE BOOST - C

** THICKENER
    NUMBER

*• WATER LOOP
    TYPE

** DISPOSAL
    NATURE
    TYPE
    LOCATION

** DISPOSAL
    NATURE
    TYPE
    LOCATION
    TRANSPORTATION
                                                              (*•*** IB/BCIBTU)
                                                              (  260 LB/MflBTU)
                                               Fee  I.D.
                                               CARBON  STEEL,  RUBBER LINED CASIN6
                                               CHfVRON
                                               NOREL  PLASTIC
                                               HORIZONTAL
                                                   t
    2.7
                                                            UASH  BOTH TOP AND ^OTTOIH OF HIST FL
                                                              (   8.7 FT/S)
                                               SO?,  PH,  PERCENT  SOLIDS
                                               NUMBfN
                                                  2
                                                  1
                                                  2
                                                  1
                                               ****
                                               «***
                                               ****
IN-LINE
STEAM
   37.8
CLOSED
INTERIM
LINED POND
ON-SITE
FINAL
POND
OFF-SITE
PIPE
                                                                   68  F)
PERIOD

5/76

6/76

7/76

8/76

9/76

tO/76
MODULE

SYSTEM

SYSTEM

SYSTEM

SYSTEM

SYSTEM

SYSTEM
._„„ 	 .. 	 	 	 PERFORMANCE DATA 	
AVAHABIILITT OPERABILITY RELIABILITY UTILIZATION

100.0

100.0

99.0

96.0

98.0

90.0
Z REMOVAL PER
S02 PART. HOURS
744

720

744

744

7?0

744

BOILER FED
HOURS HOURS
536

384

312

240

7?0

744

CAP.
FACTOR
1.0

23.0

20.0

13.0

65. C

77.0

                                               185

-------
EP* UTILITY  FGD  SURVEY:  DECEMBER 1971? - JANUARY 1979
                                            SECTION  3
                     DESIGN AND PERFORMhCE DATA FOR OPERATIONAL  FG|> SYSTEMS

PERIOD
11/76
12/76
1/77
2/77
3/77
4/77
5/77
6/77
7/77
8/77
9/77
10/77
11/77
12/77
1/78
2/78
J/7B

MODULE
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM



AVAILABILITY CPEPAB1LITY ^.LIABILITY UTILIZATION X REMOVAL PER BOILER FGD CAP.
S02 PART. HOURS HOURS HOURS FACTOR
94.0
93.0
8S.O
94.0
97.0
85.0
63.0
bR.O
91.0
81.0
90.0
98.0
98.0
9R.O
97.0
95.0
89.0
** PROBLEMS/SOLUTION S/CPWMENTS
START DATi 3/78 EeuiFMENT: BOILER-RELATED
END DATE 4/78 COMMIT: PREVENTIVE MAINTENANCE SCHEDULED
THE BOILER WAS SHUT DOWN FOR ANNUAL OVERHAUL.
AfFEcTfcD MODULES: SYSTEM
4/7?
5/7S
6/7S
7/78
8/78
9/7B
10/7?
11/7f
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
87.0
99.0
97.0
96.0
99.0
94.0
99.0
99.0
720 720
744 744
744 720
672 648
744 672
720 696
744 312
720 672
744 67?
744
720
744
720
744
744
672
744
UNIT OUTAGE
720
744
720
744
744
720
744
720
80.0
82.0
68.0
73.0
7/1.0
68. n
23.0
61.0
58.0













0
0
0
0
                                                 186

-------
                                            fPA UTILITY FGt> SURVEY; DEC?M6ER 1978 - JANUARY 1979
                                          SECTION 3
                   DESICiN AND PtRFORMAKE DATA FOR OPERATIONAL FGD SYSTEMS
COMPANY NAME
PLANT NAKf
UNIT NUMBSR
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULAR EMISSION LIMITATION  - N6/4
S02 EMISSION LIMITATION  -  K6/J
NET PLANT GENERATING CAPACITY  -  f,v
GROSS UNIT GENERATING  CAPACITY - Mfc
NFT UNIT GENERATING CAPACITY M/FGD - Ml.
NET UNIT GENERATING CAPACITY VO/FGO -  l»fc
EQUIVALENT SCRUBBED CAPACITY - KIW

** BOILER  DATA
    SUPPLIER
    TYPF
    SERVICE  LOAD
    COMMERCIAL  SERVICE  DATtf
    MAXIMUM  BOILER  FLUE  GAS  FLOW -  CD.;»/S
    FLUE  6AS  TEMPERATURE - C
    STACK  HEIGHT  -  M
     STACK  TOP DIAMETER - M

**  FUEL  DATA
     FUEL  TYPE
     FUEL  GRADE
     AVERAGE  MEAT  CONTENT - KJ/K6
     RANGE  HFAT  CONTENT - BTU/LE
     AVERAGE  ASH CONTENT - *
     RANEE  ASH CONTENT  - X
     AVERAGE MOISTURE  CONTENT - X'
     RANGE  MOISTURE  CONTFNT - X
     AVERAGE SULFUR  CONTENT - )!
     RANGE SULFUR  CONTENT - X
     AVERAGE CHLORIDE  CONTEKT - I
     RANGE CHLORIDE  CONTENT - *
     FUEL FIRING RATE  - M T/H
     FUEL FIRING RATE  - MM

 ** MECHANICAL COLLECTOR
     TYpf
     SUPPLIER

 ** PARTICULATE SCRUBBER
     TYPE
     SUPPLIER
     SHELL MATERIAL
     TYPE OF NOZZLFS
     BOILER LOAD/SCRUBBER  -  X
     LlftUlO RfcCIRCULATION  RATE  - LITfR/S
     L/G RATIO - LITER/CD. M
     PRESSURE BROP - KPA
     SUPERFICIAL GAS VELOCITY - M/S
     PARTKULATE INLET  LOAD  - G/CU.H
     PARTICULAR DESIGN REMOVAL EFF1C1EKY
     SQZ INLET CONCENTRATOR -  PPH

 ** F6D SYSTEM
     SALEABLE PRODUCT/THROW AWAY PRODUCT
     GENERAL PROCESS TYPE
     PROCESS TYPE
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LFVEL
     NEW/RETROFIT
     PARTICULATE DESIGN REMCVAL EFFU1EOCY
     SoZ DESIGN REMOVAL EFFICIENCY  -  X
     INITIAL START-UP
     CONSTRUCTION  INITIATION
     CONTRACT AWARDED

 ** ABSORBER
     MUMPER
     TYPE
NEVADA POWER
REID GARDNER
1
MOAPA
NEVADA
A
   47.
  F1*.
*******
  125.0
  110.0
<  .100  LP/MMPTU)
< 1.200  LP/MMFlTU)
  125.0
FOSTER-WHEELER
WET BOTTOM
BASE
 0/65
 ••225.--21'
   176.7
   61.
*******
 COAL
 ******
  2B959.

     6.00
 ******
 ********
 ******
      .SO
 0.5-1.0
 ********
 ******
 *******
 *****
< 47SOOO »CFM->
( 350 F)
( 200 FT)
(***** fT>
( 12430 BTU/LI3)
 ******
 <*** TPH)
 MULTICLONES
 RESEARCH COTTRELL
 VARIABLt THROAT VENTURI
 COMBUSTION ENGINEERING
 1NCOLOY 825
 TANGENTIAL
    50.0
   157.5
     1.1
     3.7
    50.3
     1.4
    97.0
   375.000
 <  2500
 (10.0 GAL/1000ACF)
 <    15  IN-H20)
 (   165.0 FT/S)
 (    .60 GR/SCF)
 THROWAWAY PRODUCT
 WET SCRUBBING
 SODIUM CARBONATE
 ADL/COMBUSTION EQUIP ASSOCIATE
 BECHTEL
 FULL-SCALE
 RETROFIT
    97.00
    90.00
  4/7*
 12/72
  7/71
 PERFORATED  PLATE WASHING TOWER
                                                167

-------
fPA UTILITY  ftO  SURVEY:  DECEMBER 19?f - JANUARY 1979
                                            SECTION 3
                     DESIGN AND PERFORMANCE DATA FOR OPERATIONAL  FED  SYSTEMS
      INITIAL  START  UP
      NUMPER  Of  STAGES
      DIHENSIONS
      BOILER  LOAD/ABSORBER - 3
      LI8UIO  REC1RCULATION RATE - LITER/1
      PRESSURE DROP  - KPA
      SUPERFICAL  6AS VELOCITY . K/SEC
      S02  OUTLET  CONTRATION - PPM

  **  FANS
      NUMGER
      TYPE
      CONSTRUCTION MATERIALS

  *•  HIST  ELIMINATOR
      NUMBER
      TYPE
      CONSTRUCTION MATERIAL
      CONFIGURATION
      WASH SYSTEM
      PRESSURE DROP - KPA

  **  TANKS
      SERVICE
      VENTURI RECYCLE

  ** REHEATER
      TYPE
      HEATING MEDIUM
      TEMPERATURE BOOST . C
      ENERGY RE6UIRFD

  ** MTE» LOOP
      TYPE
      FRESH MAKEUP WATER ADDITION  -  LITFfS/S

  •* DISPOSAL
      N*TURE
      TYPF
      LOCATION
      AREA - ACRES

  ** DISPOSAL
      N»TURE
      TYPE
      LOCATION
      TRANSPORTATION
      AREA - ACRES
 4/74
     1
50 DIA.
  100.0
   38.
      .7
     3.4
   17
<  600
< 3.0 IN-H20)
( 11.0 FT/S)
 I .C.  BOOSTER FAN
 CARBON  STEEL
 RADIAL  VANE
 316L  SS
 HORIZONTAL
•NONE
      .1
(  .5 IN-H20)
                                                 NUMBFR

                                                 ****
 INDIRECT  HOT AIR
 STEAM
    16.7        <   30 F>
 15.2""«  BTU/HR;  4MW
 OPEN
     1.6
                (   25 6PM)
 INTERIM
 CLAy LINED POND
 ON-SITE
 FINAL
 EVAP POND
 ON SITE
 GRAVITY FLOW fROM INTERIM SLUDGE POND
    «f..O
 	........ -PERFORMANCE DATA- —•
 PERIOD MODULE AVAILABILITY  OPERARIL1TY  (PLIABILITY UTILIZATION
                 X REMOVAL
                 SC2  PART.
             PER  BOILER   FCD    CAP.
            HOURS HOURS   HOURS  FACTOR
  */7*  SYSTEM
                                                                               720
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    4/74      ECUIFKENT:  FGD  SYSTEM, GENERAL
  1/75  SYSTEM

  2/75  SYSTEM
              END DATE      4/74      COMMENTS:
                            TKE  SYSTEM WAS FIRST PLACED IN SERVICE IN APRIL 1974.  THE  SCRUBBING  $*STE
                            DESIGN WAS &ASED ON INFORMATION Al«e DATA OBTAINED FROM AN 8000-ACFM  PILOT
                            PLANT  PROGRAM CONDUCTED  AT REID GARDNER STATION IN  19?1 AND  1972.
              AFFECTED MODULES:  SYSTEM

                                                                                744
                               672
        «• PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    2/75      EQUIPMENT:
              END DATE      2/75      PPOP.UM: WEATHER-RELATED COMPONENT FAILURE
                                                 168

-------
                                              EPA UTILITY FGD SURVEY:  DECEMBER  1978  - JANUARY 1979
                                            SECTION 3
                     DESIGN  AND PER FORM A f,C E DATA FOR OPERATIONAL  F6D SYSTFMS
	_	.	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY CPERA0IL1TY RELIABILITY UTILIZATION  X  REMOVAL    PER   BOILER   F60   CAP-
                                                                 S02   PART.  HOURS  HOURS   HOURS FACTOR

                           FROZEN SODIUM CARBONATE FEED LINES ACCOUNTED  FOR  OUTAGE  TIME.
              AFFECTED  MODULES: SYSTEM

       **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   2/75     E«UIPHENT: F6D SYSTEM, GENERAL
              END DATE      2/75     PROBLEM: NOT DEFINED/SPECIFIED
                           A 2-DAY LACK (F CHEMICALS RESULTED IN OUTAGE  TIME.
              AFFECTED  MODULES: SYSTEM

 3/75  SYSTEM                                                                 744

 4/75  SYSTEM                                                                 720

       **  PROBLEMS/SoLUTlONs/COMMENTS
              START  DATE   4/75     f:Bl)IFMENT: BOILER-RELATED
              END DATE      5/75     COMMENT: PREVENTIVE MAINTENANCE SCHEDULED UNIT  OUTAGE
                           TfcE BOILER HAS SHUT DOUN APRIL  II FOR ROUTINE MAINTENANCE  AND  PLACED BACK
                           C-M LINE MAY 1?.
              AFFECTED  MODULES: SYSTEM

 5/75  SYSTEM                                                                 744

       **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   5/75     teui FflENT: FGD SYSTfiMt GENERAL
              END DATE      6/7;     COMMtNTS:
                           A HIGH ASH COKTENT OF UP TO 20  PERCENT BY  WEIGHT  OF THE  COAL  BURNED
                           RECENTLY HAD l\0 EFFECT ON FMMISSICNS.
              AFFECTED  MODULES: SYSTEM

 6/75   SYSTEM                                                                 7?0

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/75     EQUIPMENTS F6D SYSTEM, 6ENERAL
              END DATE      6/75     PROBIEM: NOT DEFINED/SPECIFIED
                           ROUTINE MECHANICAL PROBLEMS WERE  REPORTED.
              AFFECTED  MODULES; SYSTEM

        **  PROBLEMS/SOLUTIONS/COMBENTS
              START DATE   6/75     ECUIfMENT: INSTRUMENTATION
              END DATE      6/75     PROBIEM: NOT DEFINED/SPECIFIED
                           RCUTINE INSTRUMENTAL PROBLEMS UERE REPORTED.
              AFFECTED  MODULES; SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/75     EOUIFPENT: PIPING
              END DATE     6/75     PROBLEM! CHEMICAL-RELATED EROSION
                           ABRASION CF  RIPBER LINED PIPES  HAS A  PROBLEM.
              AFFECTED MODULES; SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/75     EOUIFMENT: F6D SYSTEM, GENERAL
              END DATE     6/75     COMBENTS:
                           THE UTILITY  HAS REPORTED THAT A SECOND  PERFORMANCE TE$T WAS RECENTLY
                           COMPLETED  AND  PASSED.
              AFFECTED MODULES: SYSTEM

 7/75   SYSTEM                                                                 74*

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATS   7/75     E6UUMENT: BOILER-RELATED
              END DATE     9/75     PROBLEM: NOT DEFINED/SPECIFIED
                           OkE OUTAGE  UNFFLATED TO THE  FGD  SYSTEM  WAS REPORTED FROM JULY THROUGH
                           SEPTEMBER.
              AFFECTED  MODULES: SYSTEM
           PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   7/75      EBUIfMENT:  FGD  SYSTEM, GENERAL
              END DATE     9/75      I'KOBUM:  NOT DEFINED/SPECIFIED
                                                 189

-------
EPA UTILITY  FtD  SURVEY;  DECEMBER 197* - JANUARY 1979
                                             SECTION  3
                     DESHN AND PERFORMANCE  DATA  FOR OPERATIONAL FGfc SYSTEMS
	-—-PERFORMANCE  BAT A	- —	.......— ......
PERIOD  MODULE  AVAILABILITY CPERAGIL1TY  ^LIABILITY  UTILIZATION  * REMOVAL   PER  BOILER   F60    CAP.
                                                                  S02  PART. HOURS HOURS   HOURS  FACTOR

                          OUTAGFS DURING JULY  THROUGH  SEPTEMBER WERE CAUSED Br SCRUP6ER MALFUNCTIONS.
              AFFECTED MODUltS! SYSTEM
  a/75

  9/75

 10/75
SYSTEM

SYSTEM

SYST|I»
7P.O

60.0
.n
                    744

                    720

                    744
716

303
                                                            559
        *» PROfiLEMS/SOLUTIONS/CPMNENTS
              START DATE   1fl/7S      EOUII-fENT:  BOILER-RELATED
              ENp OATF     10/75      COMMIT:  PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                            LOW  OPERATING  TIME DURING OCTOBER WAS DUE TO SCHEDULED BOILER MAINTENANCE.
              AFFECTED MODULES:  SYSTEM

        •* PROBLEMS/SOLUTIONS/COMMEN1S
              START DATE   1C/75      EflUU^ENT:  REAGENT HANDLING
              END DATE     10/75      PROBl.tn:  NOT DEFINED/SPECIFIED
                            
-------
                                             EPA UTILITY FtD SURVEY:  DECEMBER  1978  -  JANUARY  1«»79
                                           SECTION 3
                    DESIGN AND PERFORMANCE DATA FOR OPERATIONAL  FGD SYSTEMS
	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY CPERABUJTY HLIABIL.IT V UTILIZATION  X REMOVAL   PER  BOILER   FGD    CAP-
                                                                S02  PART.  HOURS HOURS   HOURS  FACTOR


       ** PROBtEMS/SOlUTIONS/COMHENTf:
             START DATE   2/76     teUI WENT: F6D SYSTEM, GENERAL
             END DATE     2/76     COMM iNTS:
                          FINE SCRUBBER INOPERATIVE PERIODS WERE  REPORTED  DURING FEBRUARY.  THREE  OF
                          THESE OUTAGES WERE NOT RELATED TO THE FGD SYSTEM.
             AFFECTED MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   2/76     ECUIIHENT: PUMP, OTHER
             END DATE     2/76     PROBlfM: NOT DEFINED/SPECIFIED
                          SEAL WATER PRCtfLFMS WERE REPORTED DURING  FEBRUARY.
             AFFECTED MODULES: SYSTEf

       «* PR06LEMS/SOLUTIONS/COMMENTS
             START DATE   2/76     EQUIPMENT: PIPING
             IND DATE     2/76     PROSlFM! C HEM1 C AL-RELATF, D PLUGGING
                          CKEMICAL LINE PLUGGING PROBLEMS WERE  NOTED DURING FEBRUARY.
             AFFECTED MODULES: SYSTEM

  3/76  SYSTEM      99.0        72.0        99.0         39.0                   744    39b     287

       • * PROULEMS/SOLUTIONS/COMNENTS
             START DATE   2/76     fc&UI FMCNTi SCRUBBER
             END DATE     3/7«     PROBlfM: NOT DEFINED/SPFCJFIED
                          ONI  FOPCIC SCKUBBER OUTAGE  WAS CAUSED BY  A VENTURI  LEAK.
             AFFECTED MODULES: SYSTEM

  */76  SYSTEM      15.0        91.0       100.0         13.0                   720    106     970

       ** PROBLEMS/SOLUTlONS/COMMEim
             START DATE   4/76     t6Ulf*ENT: SoUiR-RELATED
             END DATE     4/76     COMMtMT: PREVENTIVE  MAINTENANCE  SCHEDULE1!  UNIT OUTAGE
                          ThE  POILER KA£  TAKEN OUT OF SERVICE  IN  APRIL  FOR  INSPECTION OF VftLVgS AND
                          CCAL CONDUITS.
             AFFECTED MODULES: SYSTFK

  5/76  SYSTEM                                                                 744            0

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   5/76     teUIMENT: EI01LFR-RELAT E D
             END  DATE     7/76     CCMMtNT: PREVENTIVE  MAINTENANCE  SCHEDULED  UNIT OUTAGE
                          THE  UNIT WAS  SHUT DOWN  FOR  A  SCHEDULED  TURBINE  OVERHAUL AND BURNER  LINE
                          CONDUIT  REPLACEMENT.
             AFFECTED MODULE$: SYSTEM

  6/76  SYSTEM                                                                 7ZO            0

  7/76  SYSTEM                                                                 744            0

  8/76  SYSTEM      97.0        75.0         94.0         49.0                  744    479     360

       *« PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   8/76     tSUI f-MINT: THICKENER
             END  DATE     «/76     COMMENT: PREVENTIVE  MAINTENANCE  SCHEDULED  UNIT OUTAGE
                          PLUGGING IN  TH THICKENER  CAUSED  AN  OUTAGE  DURING AUGUST.
             AFFECTED MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   8/76     EfiUIPMENT: TANK,  OTHER
             END  DATE     6/76     COMMtNT: PREVENTIVE  MAINTENANCE  SCHEDULED  UNIT OUTAGE
                          PLUGGING IN  T«E TRAY  RECYCLE  TANK DURING  AUGUST RESULTED  IN A FGC OUTAGE.
             AFFECTED MODULES: SYSTEM

  9/76  SYSTEM      95.0        97.0         95.0         89.0                  720   656    639

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   9/76     eeuiFMENT:  SPRAY  NOZZLES
             END  DATE     9/76     PROBLEM:  CHI-MI CA L-RELATFO PLUGGING


                                                191

-------
EPA UTILITY  FCD  SURVEY;  DECtMBER 1«7F  -  JANUARY 1979
                                             SEtTiON 3
                     DtSlGN AND PERFOfMAKfE  DATA  FOR OPFRATIONAL FED SYSTEMS
 __	.....	- —	-.	.............PERFORMANCE DATA-	»——.	....	—— —	"
 PERIOD MODULE  AVAILABILITY CPERAniLlT*  PLIABILITY UTILISATION  X REMOVAL   PER   BOILER  FfiD   CAPt
                                                                  SO?  PART.  HOURS  HOURS  HOURS FACTOR

                           PLUGGING  IN  THE  ViNTQRJ  SPRAY HEADERS CAUsED  A SCRUBBER OUTAGE.
              AFFICTED MOPULfcS:  SYSTEM

        ** PROHLEMS/SOLUTJONS/CCMMENTS
              START  DATl   "76      ieuifHINT:  FAN
              END DATE     9/76      PPOEtfn: NOT DIFINID/SPICIFIID
                           A*  l.C.  FAN  MALFUNCTION  RESULTED IN SCRUBSSR  OUTAGE  &URIN6  SIPTE"6ER.
              AFFECTED MODULfcS:  SYSTEH
 10/76
  11/76
  a/77

  3/77

  */77

  5/77
                        96,0
Vfe.O
87.
?*<•   676
        «• PROBLEMS/SOLUTIONS/COHMENTS
               START  KATE   10/76      ESUI^ENT: Rf*6ENT HANOI, INt
               tNC  PATE     10/76      FFCiiEW: NOT DEFINED/SPI Elf I ID
                            SCRUBBER QUTAtF TIHr WAS RfSUIREB FOB  INSTALLATION OF * NEW CARBONATf  FEFO
                            LINE.
               AFFECTED  MODULES:  SYSTSf

        ** PROBLEMS/SOLUTIONS/COfMINTS
               START  DATE   10/76      EOUItWENT: PIPING
               END  DATIf     10/76      PRCBUPI: C H1H1 C AL-RELAT F D PLUGGING
                            A MINOR SCRUeiFR TRIP WAS CAUSED  BY  PLUG6IN6  IN  THI  SCRUBBER EFFLUENT
                            SUCTION LIKE.
               AFFECTED  MODULES:  SYSTEM
         SYSTEM
            87.0
                                             84.0
            71.r
                                                                                720   631
         **  PROflLEMS/SOLUTIONS/COMFIENTS
               START DATE  11/76     EOUIFPIENT: REAGENT HANDLING
               fcND DATE    11/76     rpOBUH: NOT DEFINED/SPECIFIED
                            ONE FORCED SCRUBBER OUTAGE OCCURRED BECAUSE  OF  A  SCREW CONVEYOR FAILURE,
                            RESULTING Ik  t INABILITY TO MIX  THE CHEMICAL APSORPENT.
               AFFECTED MODULES; SYSTEM
  12/76   SYSTEM
            93.0
                         8R.O
                                     92.0
             80.0
                                                                                      677
                                                                                     599
         **  PROBLEMS/SOLUTIONS/COMMENTS
               START DATE  1Z/76     F«tJr"ENT:  FGD SYSTEM,  GENERAL
               END DATE    12/76     PKCBLEM: NOT DEFINED/SPECIFIED
                            A FORCED FED  CUTAGE  RESULTED  FROM  CHEMICAL  DEPLETION.
               AFFECTED MODULES: SYSTEM

         **  PROULEMS/SOLUT10NS/CCMHENTS
               START DATE  12/76     ECUItMENT:  PROCESS CONTROL
               END DAT?    12/76     COMtNT: PREVENTIVE  MAINTENANCE  SCHEDULED UNIT OUTAGE
                            A PLUGGED SENSING LINE  FORCED  AN FGD  OUTAGE  DUPING DECEMBER.
               AFFECTED MODULES: SYSTEM
   1/77   SYSTEM
            72.0
                                 67.0
87.0
                                                 59.0
                                                                                744   645
                                                437
         •*  PROSLEMS/SOLUTIONS/CCMMENTS
               START DATE   1/77     ECU! (WENT:  ABSORBER
               END DATE     1/77
                            RLBBFR LINING DEPAIRS WERE  INITIATED  IN THE  SEPARATOR SECTION OF  THE
                            SCRUBBING MOBILE ON  JANUARY 22.  THE  LINING WAS DAMAGED BY A HIGH
                            TEMPERATURE EHURS10N RESULTING  FROM  A MALFUNCTION IN THE UNIT'S  AIR
                            PREHEATER.
               AFFECTED MODULES: SYSTEM
SYSTEM

SYSTE*

SYSTEM

SYSTEM
                                   672

                                   744

                                   720

                                   744
                             5P9

                             669

                             400

                             705
                                                  192

-------
                                             EPA UTILITY FGL SURVEY: DECEMBER 1978 - JANUARY  1°79
                                           SECTION 3
                    DESIGN AND PERFORMAKE DATA FOR OPERATIONAL F6D SYSTEMS
._..-...._...._._............	__.....---PERFORMANCE DATA-------	-----
PERIOD MODULE AVAILABILITY CPERAB1LITY PLIABILITY UTILIZATION  X REMOVAL   PER  BOHER  F6D   CAP.
                                                                S02  PART. HOURS HOURS  HOURS  FACTOR
 6/77  SYSTEM
                   47.0
            45.0
            44 .Q
            44. fl
                                                                             720   701
                                   315
       ** PROBLEMS/SOLUHONS/COMMINTS
             START DATE   6/77     E6UIFMENT: ABSORBER
             END DATE     6/77     COMMI-NTSt
                          REPAIRS OH THI DAMAGED RUBBER LINING WERE COMPLETED BY MID-JUNE AND THE
                          SYSTEM RfMlNIB IN SERVICE THROUGHOUT THE MAJORITY OF THE MONTH.
             AFFECTED MODULES: SYSTfM

       •* PR06LEMS/SOLUTIONS/CCMMEN1S
             START DATE   6/77     |6Uir"ENT: PROCESS CONTROL
             SN*-OATf     ft/77     COMMfNTs PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTtfE
                          A I" I NCR FORCEG OUTAGE RESULTED FROM A HIGH-LON PRESSURE TRIP  CAUSED PY
                          A PLUGGED StNi'lNG LINE.
             AFFECTED MODULES! SYSTEM
  7/77
        SYSTEM
99.0
99.0
99.0
                                                       99.0
                                                                              744    744
        ** PROBLEMS/SOLUTIONS/CCMMENTS
              START  DATE   7/77     E«UIF!«ENT: ABSORBER
              END  DATE     7/77     CCMMCNT: PREVENTIVE MAINTENANCE  SCHEDULED  UNIT OUTAGE
                          THE SYSTEM WA I TAKEN OUT OF THE CAS  PATH  ONLY ONCE  DURING  THE MONTH
                          BECAUSE OF A  SCHEDULED INSPECTION OF  THE  NEWLY  REPLACED RUBBER LINER  IN
                          THE SEPARATOR SECTION.
              AFFECTED MODULES:  SYSTEM
  8/77   SYSTEM
19.0
21.0
                        19.0
                        19.0
                                  744   662
                                   138
        **  PR06LEMS/SOLUTIONS/COMNENTS
              START  DATE    8/77      tOUIIMENT:  FAN
              END  DATE      8/77      PROBLEM: DESIGN-RELATED  VIBRATION
                           I.D.  FAN  RELAVS  WERE  INSTALLED  BECAUSE  OF HIGH  FAN  VIBRATIONS.
              AFFECTED  MODULES:  SYSTEM
  9/7?  SYSTEM
84.0
73.0
69.0
35.0
720
343
                                                                       252
        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    9/77      EBUIFWENT:  B01LER-RELATFB
              END  DATE      9/77      PROBLEM:  NOT  DEFINED/SPECIFIED
                           THE BOILFR WAS  OUT OF  SERVICE  FOR MOST  OF  THE  MONTH.
              AFFECTED  MODULESr  SYSTEM
        **  PROBLEMS/SOLUTIONS/COMMEN1S
              START  DAjE    O/ 0      EQUIPMENT:  6AS  DAMPER
              END  DATE      9/77      PROBtEM:  NOT  DEFINED/SPECIFIED
                           THE SCRUBBER  MO LIMIT SWITCH  PROBLEMS  WITH  14 A  &  B  GUILLOTINE  DAMPERS.
              AFFECTED  MODULES:  SYSTEM
 10/77  SYSTEM
99.0
99.0
99.0
84.7
744   635
                                                                       630
        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   10/77      tCUIFHENT:  FAN
              END DATE     10/77      PROBLEM:  NOT  DEFINED/SPECIFIED
                           TtE UNIT  WAS  DOWN  FOR  5  HOURS  DURING OCTOBER  TO  REPAIR AN  I.D. FAN LEAK.
              AFFECTED  MODULES:  SYSTEM
 11/77  SYSTEM
                    78.7
                                81.5
                                            78.6
                                    78.1
                                              720   690
                                                                       562
        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   11/77      t"U J TMENT:  RECYCLE  TANK
              END  DATE     11/77      PROBLEM:  CHEMICAL-RELATED PLUGGING
                           SCREEN  PL16GIM?  IN THE  RECYCLE TANK WAS A PROBLEM DURING NOVEMBER-
              AFFECTED  MODULES:  SYSTEM

        **  PR08LEHS/SOLUTIONS/COMMENTS
              START  DATE   11/77      E6UIFKENT:  INSTRUMENTATION
              END  DATE     11/77      FFCBIEM:  NOT DEFINED/SPECIf1ED
                                                193

-------
EPA UTILITY  F6D SURYFY:  DECEMBER 197C - JANUARY 1979
                                            SECTION 3
                     DESIGN AND PERFORMANCE DATA FOR OPERATIONAL  FCD  SYSTEMS
	PERFORMANCE DATA	—	"
PERIOD  MODULE  AVAILABILITY CPERAB1LITY fELIABlLITY UTILISATION  «  REMOVAL    PER  BOILER  F6D    CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS  FACTOR


                           SCRUBBER INSTRUMENTATION DIFFICULTY WAS  EXPERIENCED DURIN6 NOVEMBER.

              AFFECTED  MODULES: SYSTEM


        •*  PROBLEKS/SOLUTIONS/COMMENTS
              START DATE  11/77     EQUIPMENT: TANKi OTHER
              END OATC     11/77     fRCPifM: NOT DEFINED/SPFCIFIED
                           TliE SYSTEM WAS DOWN FOR THE INSTALLATION OF  AN  OUTLET N0721E IN THE
                           BOOSTER TAKK.
              AFFECTED  MODULES: SYSTEM
 12/77
        SYSTEM
                    B5.0
                                            83.0
                                                71.0
                                                                               744
                                                                             631
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  12/77     EQUIPMENTS ABSORBER
              END DATE    1?/77     PROBITM: NOT DEFINED/SPECIFIED
                           ThO OUTAGES WIRE CAUSED BY HIGH  TRAY  DIFFERENTIAL PRESSURE.
              AFFECTED MODULES: SYSTEM

        •• PROBLEMS/SOLUT10NS/CCMMENTS
              STAPT DATE  12/77     E6UIF»ENTs FAN
              END DATE    12/77     FPOBLfM: NOT DEFINED/SPECIFIED
                           ELECTRICAL PRCPLEMS IN THE 1A  FORCED  DRAFT  FAN CAUSED AN FED SYSTEM
                           OUTAGE.
              AFFECTED MODULES: SYSTEM

        ** PRQttLEKS/SOLUTIONS/COMMENTS
              START BATE  12/77     tSUII-KENTj ABSORBER
              tNO DATE    12/77     PROBtirHs NOT DE FINED/S PfCI F I ED
                           TfcE fCRUBbER  MS OFF-L1NF FOR  APPRO*IMATILT 109 HOURS PUF TO HI6H TRAY
                           DIFFERENTIAL  FRESSURE AND SOME PLUGGING  IN  THE I.D. FAN SENSING LINE.
              AFFECTED MODULES: SYSTEM

        ** PNObLEMS/SOLUTIONS/COMMENTS
              START DATE  12/77     E6U1F*ENT; 6AS DAWPfR
              END DATE    12/77     PROBiEB: NOT DEFINED/SPtCIFIED
                           TtE fOUEK WAS DOWN ABOUT 113  HOURS  I IN DECEMBER.
              AFFECTED MO&UIES: SYSTEM S1STEM
  1/73

  2/78
SYSTEM


SYSTEM
56.0


97.0
6P.O

75.0
69.0

94.0
56. n

43.0
744

672
616
4U

292
        ** PROBlEMS/SOLUTIONS/COMMENir
              START DATE   2/7S      ESUIFMENT:  DUCTWORK
              END DATE     ;/7S      PfiOeLEM: NOT  DEFINED/SPECIFIED
                           A DUCT HI-LO  fRESSURE  TRIP  CONTRIBUTED TO THE FEBRUARY OUTA6E TIME.
              AFFECTED MODULES: SYSTEM

        ** PROfcLEMS/SOLUTIONS/COMKENTS
              START DATE   2/78      EOUII-fENT:  BOILER-RELATED
              END DATE     3/78      FROEUFM: NOT  DEFINED/SPECIFIED
                           TKE BOILER WE»T  OUT  OF SERVICE  ON FEBRUARY 17 FOR A THREE WEEK OUTAGE.
              AFFECTED MODULES: SYSTEM


        •* PROHLEWS/SOLUTIONS/COMMENTS
              START DATE   2/78      E6UIf*ENT:  PROCESS  CONTROL
              END DATE     2/7B      PRC81EM: CHEMICAL-RELATED PLUGGlNfi
                           PLUGGED  StNSI>-«  LINES  CONTPIBUTED TO THE OUTAGE TIME DURING  FEBRUARY.
              AFFECTED MODULES: SYSTEM
  3/78  SYSTEM
            2S.O
                        58.0
                                    58.0
                                                 28.0
                                                                               744
                                                                             355
                                                                                             207
           PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   3/78     EfiUjFMENT:  BQlLEp-RELATED
              END DATE     3/78     PROBLEM: NOT  DEFINED/SPECIFIED
                           TKE BOILER WAS  OFF LINE  UNTIL MARCH 16.
                                                 194

-------
                                             EPA UTILITY FGD SURVEY:  DECEMBER  1978  - JANUARY 1979
                                           SECTION 3
                    DESIGN AND PERFORMAKE DATA FOR OPERATIONAL  F6D SYSTEMS
............	.PERFORMANCE DATA-——	,--..	......	
PERIOD NODULE AVAILABILITY OPERAB1L1TY PLIABILITY UTILIZATION  X  REMOVAL    PER   BOILER   F6D    CAP.
                                                                SO?   PART.  HOURS  HOURS   HOURS  FACTOR

             AFFECTED MODULES: SYSTEM

       ** PHOBLEMS/SOLUTIONS/COMMEN1S
             START DATE   3/78     lOUIfWENT: RECYCLE TANK
             END OATF.     3/76     PROBUM: NOT DEFINED/SPECIFIED
                          A PROBLEM WAS ENCOUNTERED WITH  THE.REHEAT  STEAM  REGULATOR  DURIN6  MARCH
             AFFECTED MODULES: SYSTtf

       ** PROBLEWS/SOLUTIONS/COMMENTS
             START DATE   3/78     ECVIIMENT: GAS DAMPER
             tND DATE     3/7E     PSCBlFM: NOT DEFINED/SPECIFIED
                          PROBLEMS WITH THE GUILLOTINE  SWITCHES DELAYED  START-UP  OF  THE  FED SYSTEM
                          UMIL MARCH 2i.
             AFFECTED MODULES: SYSTEM

 4/78  SYSTEM     100.0        97.0        100.0         75.0                   720    560    541

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   4/78     E6UIFMENT: FGD SYSTEM, GENERAL
             END DATE     4/78     COMMtNTS:
                          THERE WERE NO FGD SYSTEM FORCED OUTAGES.  ALL  DOWNTIME  WAS (SOILED
                          RELATED.
             AFFECTED MODULES: SYSTEM

 5/78  SYSTEM      97.0        9?.0        96.0         78.0                   744    630    56?

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   5/76     £«UiIMENT: 6{)I LER-R ELMF D
             END DATE     5/78     PROBIEM: NOT DEFINED/SPEcIFIED
                          REPAIRS TO THE CONDENSER AND  PRODUCTION  CONTROL  CONTRIBUTED CONTRIBUTED
                          TO BOILER OUTAGES.
             AFFECTED MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   5/78     EQUIPMENT: FAN
             END DATE     5/78     FPCPIFM: NOT DEFINED/SPECIFIED
                          HIGH TEMPCRATIRE ON AN 1.0. FAN BEARING  CAUSED AN OUTAGE.
             AFFECTED MODULES: SYSTEM

 6/78  SYSTEM      89.0        89.0        100.0         89.0                   720    720    644

       ** PROBLEMS/SOLUTIONS/CCMMENTS
             START DATE   6/78     ESUIFMENTs SCRUBBER
             END DATE     6/7E     PKOBIFM: NOT DEFINED/SPECIFIED
                          TfcERE WAS ONE SCHEDULED FGD OUTAGE TO REPAIR A LEAK ON  THE VENTURI  WATER
                          BOX.
             AFFECTED MODULES: SYSTEM

 7/78  SYSTEM      100.0        99.0        100.0         99.C                   744    744    736

       ** PROBlEMS/SOLUilONS/COMMENTS
             START DATE   7/76     EfiUiFWENT: ABSOftBFft
             END DATE     7/76     PRCB1FM: NOT DEFINED/SPFclFlED
                          A  SCHEDULED  FCD  OUTAGE WAS  RE&UIRED  TO  RECTIFY A HIGH TRAY DIFFERENTIAL
                          PRESSURE PR061FM.   THE TRAY WAS  CLEANED  OUT DURING THE  OUTAGE.
             AFFECTED MODULES: SySTEM

 8/78  SYSTEM      94.0        94.0        93.0         89.0                   744    706     661

       ** PROfiLEMS/SOLUTIONS/COMMENIS
             START DATE   8/78     E6UIFMENT: ABSORBER
             END DATE     8/78     PROSLCH : NOT DEFINED/SPECIFI ED
                          THE  SCRUBBER IAS FORCED OFF LINE  ON  AUGUST 5  BECAUSE OF A LOSS OF THE
                          ASH  PANEL CONTROL POWER.   THIS  LEFT  THE  UNIT  WITHOUT EMERGENCY SPRAY TO
                          THE  SCRUBBERS •
             AFFECTED MODULES: SYSTEM
                                                195

-------
EPA UTILITY  F&D  SURVEY;  DECEMBER 197f - JANUARY  1979
                                             SECTION  3
                     DESIGN AND PERFOPMAKCE  DATA  FOR OPERATIONAL FCD SYSTFMS
			PERFORMANCE  DATA	
PERIOD  MODULE  AVAILABILITY CPEPABILITY  PLIABILITY  UTILIZATION  X REMOVAL    PER   BOILER  FGD    CAP.
                                                                  S02  PART.  HOURS HOURS  HOURS  FACTOR
        ** PR06LEMS/SOLUTIONS/COM>«IENTS
              START DATE   f /7£     IGU1WENT:  SCRUBBER
              END DATE     f,/78     pKt'PlFM:  NOT  D E F IN ED/S Pf CI FI ED
                           A  FORCCD OUTAfC  OCCURRED  ON AU&uST 20 WHEN THERE  WAS  A SCRUBBER VENTURI
                           HIGH TEWPEFATIRE ALARM.   THE EXACT CAUSE WAS NOT  KNOWH BUT A BOILER TUBE
                           LEAK WAS SUSP'CTED.
              AfFECTtD MODULES: SYSTLI"

        ** PROeLEMS/SOLUTIONS/CCMMENTr
              START DATE   J/78     EOUIf^ENT:  ABSORBfR
              END DATf     f/78     COMMENT:  pREVENTlVC MAINTENANCE SCHEDULED  UNIT  OUTA6E
                           TKt-Rf  WAS  CfcF.  SCHEDULED  OUTA6E jURING THE MONTH  TO  CLEAN THE TRAy.
              AFFECTED MOOUl tS: SYSTEM
  9/78  SYSTEM
 99.0
             97.0
                         99.0
             87.0
                                                                                720   644
                                                                                             626
        ** PRObLEMS/SOLUTIONS/COMMENTS
              START DATE   9/7?      rfiUl FT ENTs  BOI Lf R-RELATE D
              END DATE     9/78      PROPIEM! NOT DEFINED/SPECIFIED
                           TtFRf  WERE  TH^fE  BOILER  RELATED OUTAGES  DURING  SEPTEMBER.
                           LEAK  AND  BOILER  BURNER WERE REPACKED.
              AFFECTED MODULES:  SYSTEM
                                                                    A  BOILER  TUBE
           PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    9/78      tGUII^ENT:  GAS DAWPER
              END DATE      9/78      PROEUfM: DESI6N-RELATE0 PRESSURE SURSCS
                            DtRUt  THE  MOhTH A BOILER TRIP OCCURRED WHICH WAS  CAU$ED BY SCRUPBER
                            HiGH  DUCT PRE SfURE.
              AFFECTED MODULES:  SYSTEM
 10/78  SYSTEM
                   100.0
            1CO.O
100,0
90.C
                                                                                7*4   667
                                                                          667
        ** PROBLEMS/SOLUTIONS/CCMMENTS
              START DATE   10/78      EOUHHENT:  BOI LFR-RELAT E D
              END DATE     10/76      PROMT*: NOT D E F INE D/S PE CI F I ED
                            TK POILER WAI OFF LINE FOR ABOUT 77 HOURS  FOR  REMOVAL OF AN ASH CLINKER.
              AFFECTED MODULES:  SYSTEM
 11/78  SYSTEM
100.0
            100.0
100.0
             90.0
                                                                                720
                                                                                             598
        •* PRObLEMS/SOLUTJONS/COMMENTS
              START  DATE   11/78      CCUIMEN1:  INSTRUMENTATION
              END DATE     11/76      PRCBlfM: NOT DEFINED/SPECIFIED
                           THE  FGD  SYSTEM  WAS DOWN FOR SCRUBPER OUTLET  TEMPERATURE PROBE REPAIRS.
              AFFECTED MODULES:  SYSTEM

        ** PROBLEMS/SOtUTIONS/COMMENTS
              START  DATE   11/78      E6UI FMENT:  BOILF.R-RELATE D
              END DATE     11/76      FttOBLF.M: NOT DEFINED/SPECIFIED
                           OUTAGE TIMf  RFiULTED  WHEN BOILER PROBLEMS  CAUSED  THE VENTURI OUTLFT  GAS
                           TECPERATURt  TO  HECOME TO HIGH (TEMPERATURE ALARM  HIGH TRIP).
              AFFECTED MODULES:  SYSTEM
 1Z/7B  SYSTEM
 95.6
             92.8
                         92.9
                                      92.0
                                                                                744   737
                                                                          684
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START BATE   12/78      fCUjf-MENT:  SCRUBBER
              END DATE     12/78      PROBUM: NOT DEFINED /SPF (.If I £0
                            THE SCRUBBJHfi SYSTEM WAS OUT OF SERVICE  TO  REPAIR A LEAK IN * VENTURI
                            LINE.
              AFFECTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   17/78      EQUIPMENT:  SCRUBBER
              END DATE     12/78      PRCBUM: NOT DEFINED/SPF C! FIED
                            TfcE FED  SYSTf WAS DOWN TO CLEAN  THE  VENTURI  RACE TRACK AND CLEAN  PRESSURE
                                                 196

-------
                                              EPA  UTILITY  FGD SURVEY: DECEMBER 1978 - JANUARY  1979
                                            SECTION  3
                    DESIGN AND PERFORMAKCE  DATA  FOR OPERATIONAL FED SYSTEMS
...	.	.	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY CPERAB1LITY  PLIABILITY  UTILIZATION  X REMOVAL   PER  BOILER  F6D    CAP.
                                                                 502  PART. HOURS HOURS  HOURS  FACTOR

                          SENSING LINES .
             AFFECTED MODULES:  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   12/78      EOUItPIENT:
             END DATE     12/78      PROBLEM:  NOT  DEFINED/SPECIFIED
                          THE BOILER WAS  OFF LINE  APPROXIMATELY 1 DAY FOR PULVERIZER REPAIRS.
             AFFECTED MODULES:  SYSTEM

  1/79  SYSTEM      83.9         73.7        73.7         67.0                  7*4   6R1    502

       •* PROBLEMS/SOLUTIONS/COMNENTS
          	START-BATE   1/79      E6UIPMENT:  BOILER-RELATED
             END DATE     1/79      PROBLEM:  NOT  DEFINED/SPECIFIED
                          THE TOILER WAS  DOWN  ABOUT 5  BAYS TO REMOVE A CLINKER FROM THE BOTTON
                          HOPPER.
             AFFECTED MODULES:  SYSTEM

       ** PROBLEMS/SOLUTIONS/COKMENTS
             START DATE   1/79      EOUIfttENT:  PUMP, OTHER
             END DATE     1/79      PROBUMi  NOT  DEFINED/SPECIFIED
                          A  FORCED  OUTACE HAS  CAUSED WHEN THE 2C LOAD CENTER TRIPPED RESULTING  IN
                          LOSS  OF  POWER  TO  TRAY  SPRAY  PUMP.  REPAIRS WERF MADE ON THE TRAY  AND  SPRAY
                          SYSTEMS.
             AFFECTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUT10NS/COMMENTS
             START DATE   1/79      tdUIFPENT:  FAN
             END DATE     1/79      COMMSNT: PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                          TUF  F6D  SYSTEf  WAS DOWN  FOR  A SHORT PERIOD TO INSPECT THE SEARING ON  THE
                          I.D.  FAN.
             AFFECTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   1/79      tOUIIMENT:  SCRUBBER
             END DATE     1/79      PROBUM: NOT  DEFINED/SPECIFIED
                          THE  FGD  SYSTEM  UAS DOWN  TO REPAIR A LEAK IN THE VENTURI LINE.
             AFFECTED MODULES:  SYSTEM

  Z/79  STSTEM      85.6         85.9        85.9         85.6                  672   670    575

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   2/79      EOUI FMENT:  SCRUPBFR
              END DATE     2/79      PROBLEM: NOT  DEFINED/SPECIFIED
                          THE  FED  SYSTEM  WAS DOWN  TO CLEAN THE VENTURI RACE TRACK NOZZLES,  CLEAN  THE
                          EFFLUENT  LINE  AND REPAIR LEAK IN VENTURI LINE.
              AFFECTED MODULES:  SYSTEM

        ** PROSLEMS/SOLUTIONS/COMMENTS
             START DATE   2/79      EBUIfMENT: PIPING
              END DATE     2/79      FPOBifm: NOT  DEFINED/SPECIFIED
                          A  BREAK  Ih  THE  ASH CIRCULATING WATER LjNE RESULTING  IN LOSS OF EMERGENCY
                          COOLING  WATER  FORCED THE FGD SYSTEM OFF LINE.
             AFFECTED MODULES;  SYSTEM
                                                197

-------
EPA UTILITY  FCD SURVEY:  DECEMBER 1?7E - JANUARY 1979
                                            SECTION 3
                     DESIGN AND PERFORMANCE DATA FOR OPERATIONAL  F60  SYSTEMS
 COMPANY  NAM!:
 I't.ANT  NAME
 UNIT NUMBER
 CITY
 s r AT t
 Kf&ULATORY  CLASSIFICATION
 PAkTKULATE  EMISSION LIMITATION - NC/J
 S02  EMISSION  LIMITATION - KG/J
 NEI  f'LMK'T  GENERATING CAPACITY - MW
 GWOr,5  UNIT  GENERATING CAPACITY - M>
 Nl 1  UNO  f.tNERATlNG CAPACITY W/FGD - Ml.
 «t I  UM.T  GLNtRATlNS CAPACITY WO/F6D - H»'
 f nil] m.i -41  SCRUBBED CAPACITY - MW

 ** yOILFR  DATA
      SUPPLIER
      TYPE
      SERVICE LOAD
      COMMERCIAL SERVICE OATt
      MAXIMUM BOILER FLUE GAS  FLOW - CU.P/S"
      FLUF 6AS  TEMPERATURE - C
      STACK  HEIGHT - K
      STACK  TOP DIAMETER - If
               (  .100 LB/M«BTU»
               I****** LP/MMBTU)
                                               NEVADA POWEfc
                                               REID GARDNER
                                               2
                                               MOAPA
                                               NEVADA
                                               A
                                                  4%
                                               ******
                                               *******
                                                 12%0
                                                 110.0
                                               ***** **
                                                 125.0
FOSTfR WHEELER
PULVERIZED CQALt WET BOTTOM
BASE
 0/69
  Z23.21        ( 473000 ACF«J
  176.7         < 350 f>
   61.          ( 200 FT)
4 ******
                (*****  FT)
** FUEL DATA
    FUEL TYPE                                  COAL
    FUEL GRADE                                 ******
    AVERAGE HEAT CONTENT - KJ/K6                2*842.
    RANGE HEAT CONTENT - BTU/LG
    AVERAGE ASH CONTENT - X                        X.OO
    RANGE ASH CONTENT - X                      8.-10.
    AVERAGE MOISTURE CONTENT - X               ********
    RANGE MOISTURF CONTENT - X                 S-6
    AVERAGE SULFUR CONTENT - X                       .50
    RANGE SULFUR CONTENT - X                   0.5-1.0
    AVSHAGE CHLORIDE CONTENT - X               ********
    RANGE CHLORIDE CONTENT - X                 ******
    FUEL FIBIN6 RATE - M T/M                   *******
    FUEL FIRING RATE - MW                      *****

** MECHANICAL COLLECTOR
    TYpE
    SUPPLIER

»» PARTICULATE SCRUBBER
    NUMBER
    TYPE
    SUPPLIER
    LINING MATERIAL
    TYPE OF MoZZLES
    BOILER LOAD/SCRUBBER - X
    LIOUID RECIRCULATION RATE - LITER/S
    L/6 RATIO . LITER/CU.M
    PRESSURE DROP - KPA
    so2 INLET CONCENTRATION - PPM

** F6D SYSTEM
    SALEABLE PRODUCT/THROW AWAY PRODUCT
    GENERAL PROCESS TYPE
    PROCESS TYPE
    SYSTEM SUPPLIER
    A-E FIRM
    DEVELOPMENT LEVEL
    NEW/RETROFIT
    PARTICULATE DESIGN REMOVAL EFFICIENCY  -  X
    SoZ DESIGN REMOVAL EFFICIENCY - X
    INITIAL START-UP

• * ABSORBER
    NUMPEp,
    TYPE
    INITIAL START UP
    NUMBER OF STAGES
    DIMENSIONS
    BOILER LOAD/ABSORBER - X
    L/G RATIO - L/CU.M
                                                                 (  12400  BTU/LP)
                                                                  * *****
                                                                 (*** TPH)
                                                  MULTICLONES
                                                  RESEARCH  COTTRELL
                                                  VARIABLE  THROAT VENTURI
                                                  AOL/COMBUSTION EQUIP ASSOCIATES
                                                  1NCOLOY E25
                                                  TANGENTIAL
                                                     50.0
                                                                 ( 2SOO GPn>
                                                                 (10.0 GALMOCOACf)
                                                                 (   15 IN-H20)
   157.5
     1.3
     3.7
   375.000
                                                  THROWAUAY
                                                  WET  SCRUBBING
                                                  SODIUM CARBONATE
                                                  ADL/COMBUST10N EQUIP ASSOCIATE
                                                  BECHTEL
                                                  FULL-SCALE
                                                  RETROFIT
                                                     97.QO
                                                     90.00
                                                   4/74
                                                   1
                                                  PEP.FERATF6 PLATE HASHING TOWER
                                                   4/74
                                                      1
                                                  30  DIA.
                                                    100.0
                                                       .2        (  1.6 6AL/1000ACF)
                                                 198

-------
                                            EPA UTILITY F6D SURVEY:  DECEM8E*  1978  -  JANUARY  1979
                                          SECTION 3
                   DES16N AND PERFOKMAMCE DATA FOR OPERATIONAL  F6D SYSTEMS
    S02 OUTLfcT CONTRAT10N - PPM

** FANS
    TYPF
    CONSTRUCTION MATERIALS
                                                  17
1.0. BOOSTER FAN
CARBON STEEL
** BIST ELIMINATOR
    NUMBER
    TYPE
    CONSTRUCTION MATERIAL
    CONFIGURATION
    WASH SYSTEM
    PRESSURE: DROP - KPA

** TANKS
    SERVICE
     VENTURI  RECYCLE

 *» REHEATER
     TYPE
     HEATING  MEDIUM
     TEMPERATURE BOOST  -  C
     ENERGY REQUIRED

 ** VATER  LOOP
     TYPE
     FRESH MAKEUP  WATER ADDITION  •  LITF.RS/S

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     TRANSPORTATION
     AREA  - ACR6S

 ** DISPOSAL
     NATURE
     TYP1
     LOCATION
     AREA  - ACRES
       VANE
3161 SS
HORIZONTAL
NONE
     .1         (  .5 IN-H20)
NUMBF-R

****
INDIRECT MOT AIR
STirA"
   16.7         (   30  F)
15.2 MM BTU/H  (RATING)t * MW
OPfN
    1.6
                   25
FINAL
EVAP POND
ON-sm
GRAVITY FLOW FROM  INTERIM  SLUDGE POND
   45.0
INTERIM
1 PONO  (SHARED  WIT
ON-SJTE
     6.0
........._......._......—	.......... PER FORMANCE DATA	..-.. — ...—_........	.............
PERIOD MODULE  AVAILABILITY OPERAB1LITY PLIABILITY UTILIZATION  X REMOVAL   PER  BOILER  F6o   CAP.
                                                                502  PART. HOURS HOURS  HOURS FACTOR
 4/74  SYSTEM
                                                                             720
       ** PROULEMS'SOLUTIONS/COMPENTS
             START DATE   4/74     EQUIPMENT: FGD SYSTfM. GENERAL
             END DATE     4/74     COMMtNTS:
                          TttE FGO SYSTEM UAS PLACED IN SERVICE IN APRIL 1974.  THE SCRUBBING SYSTEM
                          DESIGN UAS BA
-------
fPA UTILITY  F6D  SURVEY:  DECEMBER 1«7f  - JANUARY 1979
                                            SECTION 3
                     DESIGN AND PERFORMANCE DATA FOR OPERATIONAL  F60  SYSTFMS
-------- ........ . ................. --- ..... PERFORMANCE DATA---- ..... --- - ------------------------ !!"""
PERIOD  MODULf  AVAILABILITY GPERAPILITY "LIABILITY UTILISATION   X  REMOVAL    PER  BOILER  F6D   CAP,
                                                                  SO?   PART.  HOURS HOURS  HOURS  FACTOR


        **  PR06LEMS/SOLUTJONS/COWMENTS
              START  DATE    2/75     [OUl">eNT: PIPING
              END DATE     6/75     PSOFJ I CM : CHEMICAL-RELATED EROSION
                           AtRASION Or » LfBER-LlNED plpis MfRf A  PROBLEM.
              AFFfCTED MODULES: SYSTIM

        **  PR06LEMS/SOLUTIONS/CCMMENTS
              STA«T  OATE    2775     I6UJI"ENT: F6D SYSTEM, EUNERAL
              END DATE     6/75     CORHI-NTSl
                           A SECOND PFF.FOPHANCE TEST WAS PASSfS.
              AFfiCTED HODULESs SYSTif

        **  PROBLEKS/SOLUTIONS/COMMENTS
              START  OATE    2/75     ECUl^ENT: B01LFR-RELAT! D
              END DATF     6/75     PKOE>lFM: NOT DEFINED/SPECIFIED
                           TtiE UNIT I>AS HSTARTED AFTER SHUTDOWN  FOR  S-YEAR  TURBINE OVERHAUL •
              AFFECTED MODULES: SYSTtP

        **  PRODLEWS/SOLUTIONSyCCWMENTS
              START  SATE    ?/75     EOUirfENT: PUWP, OTHER
              tND DATE     
              AFFECTED MODULES: SYSTf*

        **  PROBLEMS/SOLUT10NS/COHKENTS
              START  DATE    Z/75     E»UIffENT: BOILER-RELATED
              ENC DATE     6/7S     FfiOEUEMi NOT DE FINEO/SPF CIF IED
                           PC1LER CONTROLS WERE A PROBLEM.
              AFFECTED MODULES: SYSTEM

        **  PROBLEWS/SOLUTIONS/COMflENTS
              START  DATE    ?/75     CGUI H*ENT: RECYCLE TANK
              END BATE     4^75     PFOPttW: NOT DEFINED/SPECIFIED
                           A PLUGGED REOCLE LINE STRAINER WAS A
              AFFECTED MODULES: SYSTtr
  3/75

  */75  SYSTEM                                                                 720

  5/75  SYSTEM                                                                 744

  6/75  SVSTJK                                                                 7?CI

  7/75  SYSTEM                  65.0                                           7*4

  8/75  SYSTEM                                                                 744

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   8/75     L6UIPMENT: REA6ENT  HANDLING
              END DATE     9/75     PFOBIfM: NOT DEFINED/SPECIFIED
                           A oROKEN fcUCK!,T ELEVAT0R CONTRlBuTFD  TO A FORCED F6D OUTA6E.
              AFFECTED MODULES: SYSTtr

      .  **  PBOBLEMS/SOLUTIONS/COMMENTS
              START DAyE   8/75     ESUII'HENT: PIPIN6
              END DATE     9/75     PROB(tH: C HEMICAL-RFLATE fi  EROSION
                           WORN RECIRCUIMION PIPING CONTRIBUTED TO FORCED F6D OUTAGE.
              AFFECTED MODULES: SYSTEF

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   8/75     E6UIFWENT: ABSORBER
              END DATE     9/75     PROBtEn: NOT DEFINED/SPECIFIED
                           RtBBFR LIMER LEAKAGE CONTRIBUTED  TO FORCED F6D OUTAGE.
              AFFECTED MODULES: SYSTEM
                                                200

-------
                                               EPA UTItITT FCC SURVEY:  DECEMBER 1978  -  JANUARY 1«79
                                             SECTION  1
                     DESIGN  AND  PERFORMAhf.E DATA FOR OPERATIONAL  FGD  SYSTFMS
...	.	PERFORMANCE  DATA	
PERIOD MODULE  AVAILABILITY  GPEPA8ILITY PLIABILITY  UTILIZATION  X  REMOVAL    PER  BOILER   FED   CAP-
                                                                   S02   PART. HOURS HOURS   HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS
              St*RT DATE   8/75      EeUlf'NENT:  FGD  SYSTEM, GENERAL
              END DATE     9/75      FRCBlfM: NOT DEFINED/SPECIFIED
                           STRAINER  PLUGtlNG CONTRIBUTED TO FORCED  F6D  OUTAGE TIME.
              AFFECTED NODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   8/75      E«l!IF«£NT:  F6D  SYSTEM, GENERAL
              END DATE     9/75      PROBlFM: NOT DEFINED/SPECIFIED
                           THREE  FORCED OUTAGES OCCURRED CURING  AUGUST  AN&  SEPTEMBER.
              AFFECTED MODULES: SYSTEM

  9/75  SYSTEM                  77.0                     69.0                   720    645     496

tO/75  SYSTEM                  87.0                     62.0                   744    531     464

       ** PROBLEMS/SOLUTIONS/COMMENTf
              START DATE   10/75      EOUIFMgNT:  PUMP, OTHER
              END DATE     10/75
                           PUMP REPAIR NKESSITATED  A«  FGD OUTAGE-
              AFFECTED MODULES:  SYSTEM

        **  PROBLEMS/SOLUTIONS/COKKENTS
              START DATE   10/75      EBUIFMENT:  INSTRUMENTATION
              END DATE     10/75      PROBt.rn; NOT DEFINED/SPECIFIED
                           INSTRUMENT PLIGGING  CAUSED AN FGD OUTAGE.
              AFFECTED MODULES:  SYSTEM

        **  PHOBLEMS/SOLUTIONS/COMMENTS
              START DATE   10/75      EOUIf«ENT:  PIPING
              END DATE     10/75      PRCE>lEn: NOT DE FINED /$ PE CI F IED
                           REPAIR OF PIPING LEAKAGE  NECESSITATED AM FGD OUTAGE.
              AFFECTED MODULES:  SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   10/75      EQUIPMENT:  FGD  SYSTEM, GENERAL
              END DATE     10/75      PROBlFM: MQT DEFINtD/SPECIFIED
                            THREE  FORCED  SCRUBBER OUTAGES WgRg  REPORTED  FOR  OCTOBER.
              AFFECTED MODULES:  SySTEM

 11/75   SYSTEM                   99.0                     83.0                   720    603     596

 12/75   SYSTEM                                                                   744

        **  PROSLEMS/SOLUTIONS/CCMMENTS
              START DATE   12/75      EQUIPMENT:  PIPING
              END DATE      1/76      FKOBlfM: HEATHER-RELATED COMPONENT  FAILURE
                            FROZEN CARBONATE LINES  CONTRIBUTED  TO FGD  OUTAGE TIME*
              AFFECTED MODULES:  SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   12/75      EfiUIFCENT:  PROCESS CONTROL
              END DATE      1/76      PROBtFM: N<)T DE FINED/S PF CI F I ED
                           PLUGGED PRFSSIRE-SENSING LINES CONTRIBUTED TO FGO OUTAGE  TIME.
              AFFECTED MODULES:  SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START D*TE   12/75      EQUIPMENT:  DUCTWORK
              END DATE      1/76      PROBltH: DEsIGN-RELATED PRESSURE  SURGES
                           DUCT  PRESSURE TRIPS  CONTRIBUTED TO  FGD  OUTAGE TIME.
              AFFECTED MODULES:  SYSTEM

        **  PROSLEMS/SOLUTIONS/CCMMENTS
              START DATE   12/75      EQUIPMENT:  PUMP, OTHER
              END DATE      1/76      PROBLEM: NOT  DEFINED/SPECIFIED
                            OVERHAUL OF A TRAY  RECYCLE PUMP CONTRIBUTED Tfl  FGD  OUTAGE TIME.
                                                  201

-------
EPA UTILITY  f6D  SURVEY;  DECIDER 197f - JANUARY 1979
                                            SFCTION 3
                     DESIGN AND PERFORMANCE DAT* FOR OPERATIONAL  FG& SYSTEMS

PERIOD MODULE AVAILABILITY OHERAHILITY
AFFFCTED MODULES: SYSTEM
1/76 SYSTEM 72.0 66.0
2/76 SYSTEM 84. C 86.0

^LIABILITY UTILIZATION * REf
66.0 62.0
66.0 83. C

10VAL PER E
PART. HOURS t
744
696

(OILER FGO "CAP.
IOURS HOURS FACTOR
691 *58
675 578
        **  PROoLE'S/SOLUTlONS/CcMMENTs
              START BATE   2/76     [GUIfPENT: PUNP, OTHER
              END DATE     2/76     PFCBt^H: NOT D EFINE D /SPE Cl f I ED
                           PLUGGING 1H A VENTURI PUMP  CONTRIBUTED TO F60 OUTAGE TIME.
              AFFECTED MODULES: SYSTEM
        ** PfiO&LEf'S/SOLUTlONS/CeKMENTS
              START DATE   2/76     ECU I I-K ENT:  FGD  SYSTEM,  GENERAL
              END DATE     2/76     PROBIFM: NOT DE FINED /S PF_ CI F I ED
                           CKFMICAL DEPLETION CONTRIBUTED  TO  FGO  OUTAGE TIME.
              AFFECTED MODULES; SYSTEM

        *» PROGLEKS/SOLUTIONS/CCMMENTS
              START DATE   2/76     tCDlfPENT:  PUMP,  OTHER
              END DATE     2/76     PPOBLFM: NOT 0 E FINED /SPE CI F I ED
                           SEAL WATE* PRf.fiLEKS  CONTRIBUTED  TO FGD OUTAGE TIKE.
              AFFECTED MODULES: SYSTE0

        ** PROBLEKS/SOLUTIONS/CCHWEN1S
              START DATE   ? /76     EGUIfPENT:  FGD  SYSTEM,  GENERAL
              END DAT?     2776     PROBiEIMS NOT DEFINED/SPECIFIED
                           THE UTILITY REPORTED FOUR  ScRUBBF* INACTIVE PERIODS DURING  FEBRUARY, THREE
                           OF WHICH fcERE  SCRUBBER-RELATED  OUTAGES.
              AFFECTED MODULES: SYSTEM
  3/76  SYSTEM
67.0
«n.o
            62.0
53.0
744   660
395
        ** PROULEMS/SOLUTIONS/COMBENTS
              START DATE   3/76      EOUIFHENT:  FGD  SYSTEM,  GENERAL
              END DATE     3/76      F'ROBtEM:  NOT  DEFINED/SPECIFIED
                           TkO FGD  FCRCEC  OUTAGES OCCURRED  DURING MARCH.
              AFFECTED MODULES-  SYSTEM
        ** PROBLEMS/SOLUTIONS/COKWEN1S
              START DATE   3/76      E«UIF«ENT:  F6D  SYSTEM.  GENERAL
              END DATE     3/76      PROBLEM:  NOT  DEFINED/SPECIFIED
                           AK ELECTRICAL  FAILURE  RESULTED IN AN FGD SYSTEM  OUTA6E.
              AFFFCTED MODULES:  SYSTEM

        ** PR06LEHS/SOLUTIONS/COWMENTS
              START DATE   3/76      EQUIFKENT:  ABSORBFR
              END DATE     3/76      PROBLEM:  CHEMICAL-RELATFD PLUGGING
                           PLUGGING  IN  ThE  TRAY SYSTEM RESULTED IN A SUBSEQUENT  OVERHAUL OF THE TRAY
                           CYCLE  PUWPS.   THIS CAUSED FGD OUTAGE TINHE.
              AFFECTEP MODULES:  SYSTEM
        ** PROBLEMS/SOLUTIONS/COKMENTS
              START DATE   3/76      EQUIPMENT:  F6C  SYSTEM,  GENERAL
              END DATE     3/76      PROBLEM:  NOT  DEFINED/SPECIFIED
                           TkO FORCED SCRUBBER  OUTAGES WERE REPORTED FOR MARCH.
              AFFECTED MODULES:  SYSTEM
  4/76  SYSTEM
                    85.0
                                 77.0
                        83.0
                                                         68. C
                                                                                7?0   629
                                                                                             488
        ** PROBLEMS/SOLUTlONS/COHMENTS
              START DATE   4/76      E«UlFI"ENT:  INSTRUMENTATION
              END DATE     4/76      PROBLEM: CHEMICAL-RELATE0 PLUGGING
                           PLUGGED  SENSING  LINES RESULTED IN FGD OUTAGE  TIME.
              AFFECTED MODULES;  SYSTEM

        ** PR08LEMS/SOLUTIONS/COMMENTS
              START DATE   4/76      EfiUIfMENT:  RECYCLE TANK
              END DATE     4/76      PROBLEMS NOT DEFINED/SPECIFIED
                                                 202

-------
                                              EPA UTILITY F6D SURVEY! DECEMBER  1978  -  JANUARY 1079
                                            SECTION 3
                    DESIGN  AND  PERFORMAKE  DAT* FOR OPERATIONAL FGD SYSTEMS
—.	_	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY  OPERABILITY  FEL1ABILITY UTILIZATION
                                                                 % REMOVAL    PER   BOILER   FGO    CAP.
                                                                 S02  PART.  HOURS  HOURS   HOURS  FACTOR
  6/76

  7/76
  8/76
                           A  REHEATED  I E «K  RESULTED
             AFFECTED MODULES:  SYSTtM
                                                       FGD OUTAGE TIME.
       ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    4/76     ECUIfftENT: SCRUBBER
              END  DATE      4/76     PFOB|E«: NOT DEFINED/SPECIFIED
                           VENTURI  SfOOL RECYCLE REPLACEMENT REQUIRED  FGD  OUTAGE  TIKE.
              AFFECTED  MODULES: SYSTEM

       ** PR03LEMS/SOLUTIONS/COKMENTS
              START  DATE    4/76     ECUHKENT: TANK, OTHER
              END  DATE      4/76     PROBi^M: NOT DEFINED/SPECIFIED
                           T ANK- PATCHM1G REfiUIRED  FGft OUTAGfc TIW€i
              AFFECTED  MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/COWMENTS
              START  DATE    4/76     E8UIH*ENT: F6D SYSTEM, GENERAL
              END  DATE      4/76     FRORUM: NOT DEFINED/SPECIFIED
                           FOUR FORCED SCRUBBER OUTAGES HERE REPORTED  BY THE  UTILITY  FOB  APRIL.
              AFFECTED  MODULES: SYSTEM
  5/76   SYSTtl"
            99.0
                        83.0
                        98.0
79.0
                                                                               744
                                                                                              0
        **  PROBLE»S/SOLUT10NS/COMKENTS
              START DATE   5/76     EOUIfBENT: SCRUBBER
              END DATE     5/76
                           PLUGGED VENTUKI LINES UERE A PROBLEM.
              AFFECTED MODULES: SYSTEM

        **  PROBLENS/SOLUTIONS/COMHENTS
              START DATE   5/76     tCUIK«ENT: INSTRUMENTATION
              END DATE     5/76     PROP(tM: CHEMICAL-KELATFD PLUGGING
                           A PLUGGED SENSING LINE WBS A PROBLEM.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMNENTS
              START DATE   5/76     EGUirttENT: FGD SYSTEM,  GENERAL
              END DATE     5/76     COMMENTS:
                           TOTAL SCRUBBER OPERATION TIME TO  DATE  IS  9488  HOURS.
              AFFECTED MODULES: SYSTEM
SYSTEM

SYSTEM
91.0
                                81.0
                                            96.0
                                                         57.0
                                                           720

                                                           744
                             518
                                   421
        ** PRO&LEMS/SOLUTIONS/COMMENTS
              START DATE   7/76     EGUIIMENT:  SCRUBBER
              £ND DATE     7/76     PROBLEM: NOT DEFINED/SPECIFIED
                           A PROBLEM VIT| A HIGH SQLID$  CONCENTRATION  IN  THE VENTURI SCRUBBING CYCLE
                           CONTRIBUTED Tt F6D OUTAGE  TIME.
              AFFECTED MODULES: SYSTEM

        ** PROBLEKS/SOLUTIONS/COMMENTS
              START DATE   7/76     teulrWENT:  PIPING
              END DATE     7/76     PROBLEM: NOT DEFINED/SPECIFIED
                           THE REPIACEMEI\T OF A RUBBER-LINED  PIPE IN THE  VENTUftl SCRUBBER CONTRIBUTED
                           10 FED OUTAGE TIME.
              AFFECTED MODULES: SYSTEM

        ** PR06LEKS/SOLUTIONS/COMMENTS
              START BATE   7/76     E6UIFWENT:  FGD  SYSTEM,  GENERAL
              END DATE     7/76     PROBLEM: NOT DEFINED/SPECIFIED
                           1UO SCRUBBER  CUTA6ES WERE  REPORTED DURING
              AFFECTED MODULES: SYSTEM
                    95.0
                        75.0
                        94.0
7T.D
744   709
                                                                                    530
                                                 203

-------
EPA UTILITY  FbD SURVEY:  DECEMBER 197*  - JANUARY 1979
                                            SECTION 3
                     DESIGN  AND F-E R F OKI" A KCE DATA FOR OPERATIONAL  f6o  SYSTFMS
------------------------------------------ PERFORMANCE DATA ---- .---- -------- -- ---------- - —
PERIOD  MODULE  AVAILABILITY CURABILITY PLIABILITY UTIL17ATION  '                 ««J»" „«$,
        **  PRObLEMS/SOLUTIONS/COMMENTS
              START DATE   B/76     ESUIFWENT: F6B SYSTEM, GENERAL
              END DATF     6/76     PROEUfM: NOT DEFINED/SPECIFIED                     ...„.,.- -..,-
                           DEPLFTION Cf CHEMICAL ABSORBENT   CONTRIPUTED  TO F6 D OUTAGE TIME.
              AFFECTED MODULES: SYSTLM

        • *  PROBLEMS/SOLUTION S/COWMENTS
              START BATE   8/76     EBUIfWENT: BOILER-RFLATf D
              END DATE     B/76     PROeUM: NOT DEFINED/SPECIFIED
                           BOILER TRIPS CONTRIBUTED TO F6& OUTAGE  TlHF*
              AFFECTED MODULES: SYSTt"

        *»  PROBLEMS/SOLUTION S/CCMKENTS
              START DATE   B/76     EfiUIFKIENT: SCRUP8ER
              END DATE     8/76     PROBlEMS NOT D£ FINED/SPF CI FI EO
                           IEAKA6E IN THF VENTtlRI RECYclE LINE  CONTRIPUTED  TO  F6D OUTAGE TIWE.
              AFFECTED MODULES: SYSTEM

        «*  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   8/76     tOll^ENT: THICKEMER
              END DATE     8/76     MCBLfM: PLUGGING, OTHER
                           PLU6«ING IN THE THICKENER CONTRIBUTED TO FGO  OUTAGE
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   8/76     ECUIfENT: F6D SYSTEM, GENERAL
              END DATE     8/76     fKOP LE H : N OT D E f 1NE D /S PE Cl U ED
                           FCRCED OUTAGE TIME TOTALED 34. 5 HOURS FOR  THE FGD
              AFFFCTED MODULES: SYSTEM

        *Y$TtM      94.0        9«.0        94,0        91,0                   JtO   6(!1    «53

        •*  PROULEMS/SOLUT10NS/COMMENTS
              START DATE   9/76     f.6UIF«ENT: FAN
              END DATE     9/76     PROBUMl NOT D E FINE D /S PE C7 F I ED
                           MINOR TRIPS WERE CAUSED PV PLUGGING  IN  THE 1,0,  FAN  REFERENCE LINES,
              AFFECTED MODULES; SYSTEM

        •*  PCOBLERS/SQLUTIONS/COMMENTS
              START DATE   9/76     EOUIPKENTt INSTRUMENTATION
              END DATE     9/76     PROBiM: NOT D E f I ME D /S P E U F I ED
                           A KINOR SVSTEC TRIP MAS C«USEg BY  A  FALSE  HIGH TEMPERATURE READING  IN
                           TIE VENTUR] CAUSED BY WATER IN THE  INSTRUMENT.
              AFFECTED MODULES: SYSTtM

 10/76  SYSTEM      95.0        95.0        9S.O        8S ,C                   744   694    65*

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  10/76     EBUIfENT: GAS DAMPER
              END DATE    10/76     PPOBtEM: NOT DEFINED/SPECIFIED
                           SCRUBBER TRIPE WERE CAUSED BY VENTURI 6AS  DAMPER PROBLEMS.
              AFFECTED MODULES: SYSTEM

        **  PR08LEMS/SOLUTIONS/COMMENTS
              START DATE  10/76     E8U1HHENT: PIPING
              END DATE    10/76     FPOBI.KM; NOT DE FINED/SPF CI FI ED
                           REPLACEFIENT Of THE CARBONATE FEED  LINE  CONTRIBUTED TO FGD OUTAGE  TIME.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  10/76     ESUIfWENT: PIPING
              END DATE    10/76     PROBlfM: CHEMICAL-RELATED PLUGGING
                           PLUGGING IN Tfcf SCRUBBER EFFLUENT  LINE  CONTRIBUTED TO FGD OUTAGE  TIME.
              AFFECTED MODULES: SYSTEM

        •*  PR00LEMS/SOLUTION5/CCMMENTS
              START DATE  10/76     ESUIf^ENT: BOILER-RELATED
              END DATE    10/76     PROBlfM: NOT DEFINED/SPECIFIED


                                                204

-------
                                              EPA  UTHJTY FGO SURVEY: DECEMBER  T978  -  JANUARY  1979
                                            SECTION 3
                    DESIGN  AND  PERFORMANCE  DATA  FOR OPERATIONAL F6D SYSTEMS
....—......	.....	.	.—.	----PERFORMANCE DATA	—
PERIOD MODULE AVAILABILITY OPERABILJTY  PLIABILITY UTILIZATION  X REMOVAL   PER  BOILER   FGD    CAP.
                                                                 SC2  PART. HOURS HOURS   HOURS  FACTOR

                           SCRUBBER OUTA«  TI«| DUE TO BOILER TRIPS AMOUNTED TO APPROXIMATELY 65
                           HOURS.
              AFFECTED MODULES:  SYSTEM

11/76  SYSTEM      52.0         58.0         51.0        50.0                   720    621     363

12/76  SYSTEM                                                                  744    275      D

       ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   12/76      [GUIFKENT: BOILER-RELATED
              END  DATE     12/76      PROBLEM: NOT DEFINED/SPECIFIED
                           TfcE BOILER UA< OOHN FOR REPAIR OF A CONDENSER TUBE  LEAK  AND BOTTOM ASH
              AFffrCTED flODULtSs  SYSTEM

       ** PRObLEMS/SOLUTIONS/COMMENTS
              START DATE   12/76      t'SUll'NENT: GAS DAMPER
              END  DATE     12/76      PROBUM: NOT DEF INED/SPE CI F 1 fcD
                           OlRIfJf  THt BOILER OUTAGE THE SCRUBBER'S GUILLOTINE  DAMPERS  WERF  BADLY
                           DAMAGED.   THE SCRUBBER REMAINED OUT OF SERVICE DURING THE MONTH  OF
                           DECEMBER.
              AFFfCTED  MODULES:  SYSTEM

  1/77   SYSTEM                                                                 744            0

        *« PROBLEMS/SOLUTION&/COMHENTS
              START  DATE    1/77      jOUIMENT: BOILER-RELATED
              END  DATE      1/77      FKOPIIM: NOT DEFINED/SPECIFIED
                           THE R01LF.fi tiAi OFF LINE DURING JANUARY FOR MAINTENANCE*
              AFFECTfcO  MODULES:  SYSTfcM

  Z/7r  SYSTEM      95.0         75.0        88.0        5ft.0                   672    516     387

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    2/77     f 6Ul FB6NTI SCRUPBEk
              END  DATE      2/77     PROBUM: NOT DEFINED/SPf(IFI ED
                           A  MINOR SCRUB .ED OUTA6E RESULTED  FROM A VENTUfU  PIPING LEAK.
              AFFECTED  MODULES: SYSTtf

        **  PHOI9L«MS/SOLUTIONS/COMMEN1S
              START  DATE    2/77     fe«UUMENTs FGO SYSTEM, GtNERAL
              END  DATE      2/77     F'POEt'M: NOT DE FINED/S PF CI FI ED
                           AT THE END of FEBRUARY  THERE WERE SOME ELECTRICAL  PROBLEMS.
              AFFECTED  MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DAT?    2/77     LQUIFHENT: TANK,  OTHER
              END  DATE      2/77     f-KOBt'M: NOT DE FINED/S PE CIF 1 ED
                           A PINCR SCRUE'ER OUTAGE UA$ REQUIRED  TO  ClF-Aty  THE  VA$H TRAY RECyCLF  TANK.
              AFFECTED  MODULES: SYSTEM

  3/77  SYSTEM      92.0         £6.0        97.0        76.0                   744    659     567

        **  PROBLEMS/SOLUT10NS/COMMENTS
              START  DATE    7/77      EGUIFTENT: ABSORBER
              END  DATE      3/77     PPOPLfM: CHEMICAL-RELATED  PLUGGING
                           A PLUGGED  SPR/iY  TRAY CONTRIBUTED  TO  FGD  OUTAGE TIME.
              AFFECTED  MODULES: SYSTHM

        **  PRObLEMS/SOLUTIONS/CCMMENTS
              START  DATE    3/77     E6UIFMENT:  FGD SYSTEM,  GENERAL
              END  DAT?      3/77     PRGBLFM: NOT DEFINED/SPFCIFI ED
                           ELECTRICAL PRCPLEMS  CONTRIf?UTED  TO  FGD  OUTAGE  TIME.
              AFFECTED  MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    3/77     [(lOH^ENT: CAS DAMPER
              END  DATE      3/77     FFOtUrM: 0ESIGN-RFLATED  PRESSURE  SURGFS
                                                 205

-------
FPA UTILITY  F&D  SURVEY: DECtKBFft  197?  -  JANUARY 1979
                                             SECTION 3
                     DESIGN AND  PE RF ORM A ».C E DATA FOR OPERATIONAL  FGD SYSTEMS
------------------------------------------ PERFORMANCE DATA
PERIOD MODULE  AVAILABILITY OPEMCILITT  ^LIABILITY UTILIZATION
                                                                                     IJOUU
                           OLCT  PRESSURE  SWINGING CONTRIBUTED  TO  FGD OUTAGE TIKE.
              AFFECTED MODULES:  SYSTEM

        **  PROSLEMS/SOLiniONS/COKMENTS
              START DATE   3/77      EBUI^ENT: FAN
              END DATE     3/77      PROBlFM: NOT D I FINE 0 /S PF CI F I ED
                           AN  I.D.  FAN  SUNG CONTRIBUTED TO  FGD  OUTAGE TIME.
              AFFECTED MODULES:  STSTEK
  A/77   SYSTE>
                    95.0
                                 95.0
                                             95.0
                                                         95.0
                                                                                 720    720
                                                                                              685
        *» PROBLEMS/SOLUTIONS/COMWENTS
              START DATE    4/77      EBUIf'ENT: SCRUPBES
              END DATE      */77      PROBLEM? NOT D E FIN E D /S PE CI F I ED
                            FCRCFD  FGD OU1A6E T1«E RESULTED  FROM  A LEAK IN THE VEMTUKJ DISCHARGE LINF.
              AFFECTED NODULES:  SYSTEM
  5/77  SYSTEM
                    99.0
                                 E5.0
                                             98 .0
                                                          60.0
                                                                                 7*4
                                                                                              445
        •» PROBLEHS/SOLUllONS/COfWENTS
              START DATE    5/77      £«UjfNENT; Bfll L ER-RELA T E D
              END DATE      5/77      PROBIFH: NOT DEFINED/SPFclfI ED
                            CltE  BOILEK OUTAGE OCCURRED DURING  PAY.
              AFFECTED MODULES:  SYSTtn

        *« PROatEHS/SOLUTlONS/COKKENTS
              STApT DATf    5/77      ECUIFKENT: PUMP, OTHER
              END DATE      5/77      PROBttMr NOT DEFINED/SPECIFIED
                            THE  ASH SERVICF  PUMPS WERE OUT Of  SERVICE FOR AppRoXIHATELY TO HOURS
                            RESULTING IN DO EMERGENCY SPRAY  THUS  FORCING THE  FGD  SYSTEM OUT OF SFRVjCE
              AFFECTED MODULES:  SYSTEM
  6/77  SYSTEM
                    94.0
                                 93.0
                                             94 .0
           83.0


:  FGD SYSTEM, GENERAL
                                                                                 720    639
                                                                                              596
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    6/77
              tND DATE      6/77     COMMENTS:
                            TtiREF FORCED SCRUBBER OUTAGES  WERE REPORTED IN JUNE.
              AFFECTED MODULES: SYSTEM
        ** PROBLEMS/SOLUTIONS/COKMENTS
              START  DATE    6/77      EBUlf-'WENT: INSTRUMENTATION
              END DATF      6/77      PROBLEM: C HEMIC AL-RELATF D PLUGGING
                            OtiE  FORCED OUTAGE WAS DUE  TO  PLUGGING OF THE I.D.  FAN SENSING CINE.
              AFFECTED HODUlESl  SYSTEM

        ** PROBLEKS/SOLUTIONS/COMMENTS
              START  DATE    6/77      ECUIPMENT: FGD SYSTEM,  GENERAt
              END DATE      6/77      PPOBIEH: NOT D E F IN EO/S PE Cl f 1 ED
                            OkE  FORCED OU1A6E WAS DUE  TO  A BREAKER TRIP RESULTING IN LOSS OF  CONTROL
                            POWER.
              AFFFCTED MODULES:  SYSTEM

        «« PROULEMS/SOLUTIONS/COMMENTS
              START  DATE    6/77      EBUIfMENT: SPRAY  NOZZLES
              END DATE      6/77      PROFUFM: CHEMICAL-RELATED PLU66ING
                            OfcE  FORCED OUTAGE WAS DUE  TO  PLU6UN6 Of THE SPRAY NOZZLES IN THE VENTOR1.
              AFFECTED MODULES:  SYSTEM
  7/77   SYSTEM
                    40.0
                                 41.0
                                             40.0
                                                          40.0
                                                                                 744   733
                                                                                              298
        ** PftOB|.Ef*$/50LUT10N$/COM!"!ENT$
              START 6ATF    7/77      E6UUMEN7:
              END BATE      7/77      PROBIEH: DESI6N-RELATEC PRESSURE SURGES
                            SEVEN  FORCED (CD OUTAGES  WRRE  DUE TO A H16H/LOW  TRIP IN THE SCRUBBER  DUCT
                            DURIN6 JULY.
              AFFECTED MODULES: SYSTEM
                                                 206

-------
                                               EPA  UTUITV FGt SURVEY:  DECEMBER 1978  -  JANUARY 1979
                                             SECTION  3
                     DESIGN  AMD  PE RFOPMA IvC E DATA  FOR OPERATIONAL  FED  SYSTEMS
__.._.._._	.	....	PERFORMANCE  DATA	
PERIOD MODULE  AVAILABILITY  OPERABILITY  ((LIABILITY  UTILIZATION  X  REMOVAL   PER  BOILER   F6D   CAP.
                                                                   S02   PART. HOURS HOURS   HOURS FACTOR


       *» PROBLEMS/SOLUT10NS/COWWENTS
              START DATE   7/77      EQUItKENT:  SPRAY NOZZLES
              END DATE     7/77      PRCBLiM: CHEMICAL-RELATED PLUGGING
                           ONE TWO HOUR  CUTAGE  WAS  REQUIRED TO  CORRECT A PLUGGING PROBLEM IN THE
                           VENTURI SPRAY NOZZLES DURING JULY.
              AFFECTED MODULES:  SYSTEM

  8/77   SYSTEM      B7.0         91.0        87.0        79.0                   74*    6?9     590

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   8/77      EQUIPMENT:  SCRUBBE.R
              END DATE     8/77      PROBLEM: NOT D£ FINED/SPE CI FI ED
                           A LEAK IK! THE VENTURI RECYCLE HEADER  RESULTED IN AN  FGD OUTAGE.
              AFFECTED MODULES:  SYSTEM

        **  PR08LEMS/SOLUTIONS/COMWEN1S
              START DATE   S/77      ICUIfMENT:  DUCTWORK
              END DATE     8/77      PROBLEM: DESIGN-RELATED PRESSURE  SURGES
                           A SCRUPBEfi DUCT  HIGH/LOU  BOILER TRIP  PROBLEM RESULTED IN  OUTAGE TIME*
              AFFECTED MODULES:  SYSTfcK

        **  PROBLEHS/SOLUTIONS/COMMENTS
              START DATE    8/77      EGUlf-WENT:  BOILER-RELATED
              END DATE      8/77     PROBLEM: NOT DEFINED/SPECIFIED
                            TKRE WAS ONE BOILER RELATED OUTAGE  DURING AUGUST.
              AFFECTED MODULES:  SYSTEF

  9/77  STSTEK      74.0         67.0         71.0        64.C                   720    716     46?

        **  PROQLEMS/SOLUTIONS/COMMENTS
              START DATE    9/77     EGUlTMENT:  SCRUBBER
              END  DATE      9/77     PPCBt-fM: NOT DEF1NED/SPE cIF I £D
                            A  LEAK IN THE VENTURI RECYCLE LINES  RESULTED IN FORCED FGD  OUTAGE TIMf.
              AFFECTED MODULES: SYSTEM

        *«  PROBLEMS/SOLUTIONS/COHKEN1S
              START DATE    9/77      EQUIPMENT:  PUMP, OTHER
              END  DATE      9/77     PROBLEM: NOT DEFINED/SPECIFI ED
                            TRAY RECYCLE  (UKP  REPAIR NECESSITATED  F€D OUTAGE TIME.
              AFFECTED  MODULES: SrSTEl*

        ** PROBLEKS/SOLUTIONS/COMCENTS
              START DATE    9/77     EfiUl^iENT:  INSTRUMENTATION
              END  D»TE      9/77     PFOBlEH!  CHEMICAL-RELATED  PLUGGING
                            DUCT PRESSURE HIGH/LOU SENSING  LINF  PLUGGING RESULTED IN  FORCED F6D OUTAGE
              AFFECTED  MODULES: SYSTEf

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DAjE    9/77     E8UIFMENT:  FGD SYSTEM, GENERAL
              END  DATE      9/77     PROBLE«:  NOT DEFINED/SPECIFIED
                            Ak OUTAGE OCCtRRED  WHEN THE.  ASH SLUICE  SYSTEff W E H|T OUT OF SERVICE 
-------
EP» UTILITY  FGD SURVEY: DECEPbER  1
-------
                                                EPA UTILITY  fCSt SURVEY:  DECEMBER 1978  -  JANUARY 1979
                                              SECTION 3
                     DESIGN  AND PERFORMANCE  DATA FOR OPERATIONAL FGD SYSTEMS
	PERFORMANCE  DATA	
PERIOD MODULE  AVAILABILITY  CPERA6IL1TY  PLIABILITY UTILIZATION  X REMOVAL    PER  BOILER   FGD   CAP.
                                                                    S02   PART.  HOURS HOURS   HOURS FACTOR

                            REPAIRS OK THE  THICKENER OVERFLOW pUMP CONTRIBUTED TO FGD OUTAGE  TIME.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMWENTS
              START  DATE    1/78     ESUIfHENT: SCRUBBER
              END DATE      1/78     PROB^tM: NOT DEFINED/SPEClfI ED
                            SCME BUILD UP  IN  THF VENTURI CONTRIBUTED TO  FGD  OUTAGE Tl«F DURING
                            JANUARY.
              AFFECTED MODULES: SYSTtP

  2/78   SYSTEM       93.0         92.0         92.0         87.C                   672    6?6     585

        **  PROBLEMS/SOLUT10NS/COKMENTS
              START  DATE    2/78     IfiUIfflENT: INSTRUMENTATION
              END DATE      2/78     PROBLEM: CHEMICAL-RELATED PLUGGING
                            A DUCT HltH/LfW PRESSURE TRIP CONTRIBUTED  TO OUTAGE TIME.
              AFFECTED MODULES: SYSTEM  SYSTEM

        **  PROatEMS/SOLUTlONS/COMMENTS
              START  DATE    2/78     EQU1W!ENT: BOILER-RELATE D
              END DATE      2/7B     PROBlfM: NOT DEFINED/SPECIFIED
                            ThE POILF.R WAi: OUT OF SERVICE FOR 34 HOURS DURING FEBRUARY.
              AFFECTED  MODULES: SYSTEM

  3/76   SYSTEM       9B.O         89.0         97.0         80.0                   74*.    672     595

        **  PRObLEMS/SOLUTlONS/CCMMENTS
              START  DATE    3/78      E«UJFtfENT: FGD  SYr.TEM, GfcNtRAL
              END DATE      3/78      FPOUIfM: NOT DEFINED/SPECIFIED
                            TfcERF  WAS  CULT ONE FORCED  FGD OUTAGE  DURING MARCH WHICH LASTED AF'PROX1MATE
                            LY  1P  HOUfcS.
              AFFECTED  MODULES: SYSTEM

        ** PROELEMS/SOLUTIONS/CCMWENIS
              START  DATE    3/7fc      EOUII^ENT: BOILSR-ftELATED
              END DATE      1/78      COMMENTS:
                            A SCHDULED  BOILER OUTAGE  AT THF BEGINNING  OF MARCH TO REMOVE  ASH
                            W*S  CANCELLED .
              AFFECTED  MODULES: SYSTtl*

  4/78  SYSTEM      1CO.O        9E.O         100.0         4*.C                   720    320     317

        ** PROBLEMS/SOLUTIONS/CCKMENTS
              START  DATE   4/78      tGliltWENT: P.OI L ER-RELATE 0
               END  DATE      4/7B      COMMtMT: PREVENTIVE MAINTENANCE  SCHEDULED UNIT OUTAGE
                            ThERE  WAS  0*E  SCHEDULED BOILER OUTAGE  WHICH LASTED ABOUT  403  HOURS.
              AFfECTED  MODULES:  SYSTEM

  5/76  SYSTEM      100.0        100.0         100.0         V7.0                   ?44    726     724

        ** PROBLEKS/SOLUTIOMS/COMKENTS
              START  DATE   5/78      tGUIlKENT: BOI LT R-RE LA T F tl
               END  DATE      5/78      PROBLFH:  NOT 0 EF1 NED/S PF. CI F I ED
                            ThE  FOILER  WAS OFF  FOR  APPROXIMATELY  1g  HOURS FOR REPAIRS ON  THE MILL
                            SPOKES.
              AFFECTED  MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/CCfrtfENTS
               START  DATE   5/78      ECUI t-f-ENT:  FGD SYSTEMt  GENERAL
               END  DATE      5/78      PKOPUM:  NOT  D E FINED/SPE'CI F I ED
                            TfcE  2A SEC.  FjSfAKER  TRIPPEI5 AND  CAUSED AN  OUTAGE  OF  ABOUT ONE HOUR.
               AFFECTED  MODULES:  SYSTEM

  6/7B  SYSTEM      100.0        92.0         100.0         92.0                   7?Q    720    661

        ** PROBLEKS/SOLUTIONS/COKHENTS
               START  DATE   6/78      E8UIFMENT:  F6D SYSTEM,  GENERAL
               END  DATE      6/78      PROBUM:  NOT  D E F I H ED /S PE CI F I ED



                                                   209

-------
EPA UTILITY  f&6  SURVEY: 0£Ctl»frFK  197f  - JANUARY 1979
                                             StCTICN 3
                     DESIGN  AND  FERf0*MA'CE DATA FOP OPERATIONAL FfD SYSTEMS
                                            PERFORMANCE  DATA -----------------------------
PERIOD  MODULE  AVAILABILITY  OPEP.ABUm  PLIABILITY UTILIZATION       POV           BOILER
                           TKRE'WERE  TO*  SCHEDULED FED OUTAGES  TO UNPLUG THE  TRAYS  AND TO CHANSE
                           THE  OIL  ON  TH*  i .p. CAN •
              AFFECUD MODULES:  SYSTtK

        **  PROBLEMS/iOLUTIONS/COMMENTS
              START DATE   t/76      E<>UIFI«ENT: DUCTWORK
              END DATE     < /7fr      PKOetKM: DESIGN-RELATED  PRESSURE SUR6SS
                           A  FORCED  FCD UlTA&f OCCURRED WHEN  HIGH DUCT PRESSURE  CAUSED A BOILER  TRIP.
              AFFECTED MODULES:  SYSTEM

  7/76   STSTE*      KO.O         £2.0        79.0        7A.O                    74*    676    551

        *»  PROKLEMS/SOLUT10NS/COMNENTS
              START DATE   7 /78      tOUIIWENT: BOILF.R-RILATE D
              END DATE     7/7£      f'PCFKh: NOT DE F INED/S PE CI F I ID
                           TK  PCILFI.  k»'  OUT OF SERVICE  DUE  TO  A BOILER TUBE  LEAK.
              AFFECTED KODULIS:  SYSTEM
        *«
              START DATE    7/7?      ICUI'flENI: 60CTWORK
              END DATF      7/7B      FfCE-l^: D E SIGN-RELATE D  PRESSURE SURGES
                            HIGH  OUCT P&ESSURt WAS THf;  CAUSE  OF  A BOILER TRIP.   THE  HIGH DUCT PRESSURE
                            WAS CAUSED EiY A FAULTY POSITIONER ON THE 1.0. FAN CONTROLLER.
              AFFECTED MODULES:  SYSTEM

        ** PPOULEMS/SOLUTIONS/COHMENTS
              START DATE    7/78      EOLIIPtNT: EXPANSION  JOINT
              END DATE      7/78      FFCBIEH; DE, S1GN-RF LATE D  INFERIOR CONSTRUCTION  MATERIAL
                            Tt-E I.D. FAIv rXPANSION JOINT  ON  THE  SCRUPBFR WAS REPLACED.
              AFFECTED MODULES:  SYSTEM

        •* PROCLEMS/SOLUTIONS/COWWENTS
              START DATE    7/78      EGUirfENT: FAN
              END DATE      7/78      FPOEITM: NOT DEFINED/SPECIFIED
                            Ah fft OUTAIE OCCURRED WHEN A  EtOLT,  WHICH FELL  FROM  THE  FAN, CAUSED
                            VIBRATIONS.
              AFFECTED MODULES:  SYSTEM

        ** PRObLEMS/SOLUTlONS/COMMENTS
              START DATE    7/78      LCUjr-PENT; BOILER-RELATED
              END DATE      7/78      PROP UM JvNOT DEFINED/SPECIFIED
                            A  SECOND E'CILfR TRIP DURING JULY  MS CAUSED BY  AN UNDETERMINED SOURCE.
              AFFECTED MODULtS:  SYSTEF1

        ** PROBLEMS/SOLUTIONS/COMMENTS
              STApT DATE    7/78      EOUIfPENT: PIPING
              END DATE      7/78      PFOFUEM: CHEMICAL-RELATED PLUGGING
                            THE SUCTION LINE FROM THF VENTURI DISCHARGE LINE TO  THE  EFFLUENT PUMPS
                            WAS CLEANED 0 IT DUE TO PLUGGING.
              AFFECTED MODULES:  SYSTEM

  8/78   SYSTEM      81.0         82.0        93.0         81. P                   744    7?3    601

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    8/78      fcCUIFMENT: ABSORBER
              END DATE      8/78      COMMENT: PREVENTIVE  MAINTENANCE SCHEDULED  UNIT OUTAGE
                            ThO SCHEDULED OUTAGES DUPING  AUGUST  WERE NECESSARY  TO CLEAN THE SCRUBBER
                            TRAY.
              AFFECTED MODULES:  SYSTEM

        •* PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    S /78      EQUIPMENT: SPRAY NOZZLES
              END DATE      £ /78      COMWfNT: PREVENTIVE  MAINTENANCE SCHEDULED  UNIT OUTA6E
                            A  SCHEDULED OITAGE WAS NECESSARY  TO  CLEAN THE NOZZLES ON THE SCRUBBER SPRA
                            RACK.  THE STMNLESS STEEL  PIPE  TO THE  TRAY SPRAY  NOZZLES WAS  ALSO
                            REPLACED.
              AFFECTED MODULES:  SYSTEM

-------
                                              EPA UTILITY  FGD SURVEY: DECEMBER 1978  -  JANUARY  1«79
                                            SECTION  3
                    DESIGN  AND PERFORMANCE DATA FOR OPERATIONAL FED SYSTEMS
	.......	._._.....	....	........ PERF OHM ANCE  6 AT A	•	•	»-.—..-_._ — .._... — _.—..
PERIOD MODULE AVAILABILITY CPERAB1L1TY IELIA6ILITY UTILIZATION   Z REMOVAL   PER  BOILER   FPD    CAP.
                                                                  S02  PART. HOURS HOURS   HOURS  FACTOR
       •« PROBLEKS/SOLUTIONS/COMMENTS
              START  DAT;    «/78     reuirnENT:  DUCTWORK
              END  DATE      K/78     PROBLEM: DESIGN-RELATED PRESSURE SUR6ES
                           Oh AUGUST 1 T»f  SCRUBBER  EXPERIENCED HIGH DUCT PRESSURE.
              AFFECTED  MODULES: SYSTEM

       ** PROBLEMS/SOLUT10NS/COWMENTS
              START  OATE    8/78     EQUIPMENT:  PUMP, OTHER
              END  DATE      8/78     PROBtFM: NOT  DEFINED/SPECIFIED
                           ON AU6UST I IT WAS NECESSARY  TO  TAKE THE SCRUBBER OFF LINE  TO  REPACK  THE
                           VEKTURI PUMPS .
              AfFECTEO  MODULES: SYSTEM

       ** PRObtENS/SOLUTIONS/COMMENTS
              START  DATE    S/78     LCUlffiENT;  F6D  SYSTEM,  GENERAL
              END  DATE      t /78     F FOB IE PI : MOT  D EFINED /S PE CI F I ED
                           A THIRD OUTA6F IN AUGUST  WAS  CAUSED BY A LOSS OF THE ASH  PANEL CONTROL
                           PCWER.  THIS  LEFT THE  SCRUBBER WITHOUT EMERGENCY SPRAY.
              AFFECTED  MODULES: SYSTEM

  9/78  SYSTEI"     tOO.O         «7.0        100.0         94 . P                   720    693     675

       ** PRObLEHS/SOLUTlONS/CCKMENTS
              STABT  DATE    9/78     IttllfENT:  F6D  SYSTEM,  GENERAL
              END  DATE      9/78     CCNMNT: PREVENTIVE  MAINTENANCE SCHEDULED  UNIT OUTAGE
                           A SCHEDULED SCRUBBER OUTA6E TOOK PLACE DURING SEPTEMBER IN  ORDER TO  CLEAN
                           THE TRAY RECYCLE TANK  AS  WELL AS THE TRAY AND SOME  OF THE LINES.
              AFFECTED  MODULES: SYSTEK

        **  PAOBLEMS/SOLUTIONS/COPMEN1S
              START  DATE    9/78     ESUIIWENT:  B01LFR-RELATE0
              END DATE      9/7g     PROEIEM: NOT  DEFINEO/SPEC1FItD
                           THREE  BOILER  ELATED OUTAGES  WERE CAUSED BY PROBLEMS WITH A 1C-KU
                           GENERATOR.  CCNTROL  POUER SURGES WERE BEING CAUSED  BY OVERVOLTA6E MOTOR
                           TRIPS.
              AFFECTED MODULES: SYSTEM

 10/7S   SYSTEM      96.0        95.0         99.0        92.0                   744    7J1     6£S

        **  PRObLEMS/SOLUTIONS/COMMENTS
              START DATE   10/78     EeUIFWINT:  INSTRUMENTATION
              END DATE      1C/76     COMMIT: PREVENTIVE  MAINTENANCE SCHEDULED  UNIT OUTAGE
                           OLRm  OCTOBFl-  THE  SCRUBBER INSTRUMENTS WERE WORKED ON  DURING  A SCHEDULED
                           OUTAGE.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   10/78     t«VI f "
-------
SPA UTILITY  F60 SURVEY:  DECEMETR l97f  -  JANUARY 1979
                                              StCTlON 3
                      DESIGN  AM) PERFORMANCE  DATA fOR OPERATIONAL F60 SYSTEMS
			PERFORMANCE DATA	  "
PERIOD  MODULE AVAILABILITY OPEPAf'lDTY  PLIABILITY UTILIZATION  X REMOVAL    PER  BOILER   F68   CAP.
                                                                    S02  PART.  HOURS HOURS   HOURS FACTOR


        .. PROGLEMS/SOLUTIONS/COMMENTS
              START  DME   11/7f     E6UIFKENT:  BOILER-RELATED
              END  DATE     11/76     COMMINT: PREVENTIVE MAINTENANCE SCHEDULED  UNIT OUTAGE
                            TfcE UNIT K*S  !HUT DOWN NOVEMBER  12 FOR SCHEDULED  BOILER MAINTENANCE.  THE
                            UMT REMAINED  OUT OF SERVICE THE  RtMAJNDER OF THE MONTH.
              AFFECTED  MODULES: SYSTEM

12/78   SYSTEM       95.9        100.0        100.0        13.7                    74*   990     990

        ** PR06LEMS/SOLUT10NS/COMMENTS
              START  DATE   12/78     [OUIfWENT:  PIPING
              END  DATE     t?/78     COtfMtNT: PREVENTIVE MAINTENANCE SCHEDULED  UNIT OUTAGE
                            Tt-E SCRUBf-'ER  VAS DOWN TO UNPLUG  EFFLUENT LINE.
              AFFECTED  MODULES: SYSTEM

        •* PRObLEMS/SOLUTIONS/CCKMENTS
              START  D«TE   12/7*     EOUIFKENT:  BOILER-RELATED
              END  DATE     12V78     PRCElFn: NOT DEFINED/SPECIFIED
                            WhILf THE  SCRtfEER WAS DOWN THE  FOILER WAS ALSO  OOUN FOR PULVERIZER
                            REPAIRS.
              AFFECTED  MODULES: SYSTEM

        ** PROeLEMS/SOLUTIONS/COKIPIENTS
              START  DATE   12/7E     ECLlhMENTr  BOIL FR-RELATF D
              END  DATE     1Z/7E     COMiMtf.T: pREVENTlV^ MAINTENANCE SCHEDULED  UNIT OUTAGE
                            TtE PCJLER kA£ OFF UNTIL DECEMBER  76 FOR SCHEDULED  MAINTENANCE.
              AFFECTED  MODULES: SYSTEM

  1/79   SYSTEM       82.9         61.3         81.3        73.9                    7«4   676     549

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    1/79     IQUIIfENT:  ABSORBER
              END  DATE      1/79     PROBLEM: NOT DEFINED/SPECIFIED
                            TK F6D SYSTEK WAS DOWN TO CLEAN  A TRAY SCREEN.
              AFFECTED  MODULES: SYSTEM

        •* PROBLEMS/SOLOTIONS/CCMMENTS
              START  DATE    1/79     E6UII^ENT:  PIPING
              £ND  DATE      1/79     PPOBttM: NOT DEFINED/SPECIFIED
                            THE F6D SYSTF!' WAS DOWN TO REPAIR  A LEAK IN THE  VENTUAI RECYCLE  LINE.
              AFFECTED  MODULES: SYSTEM

        ** PROBLErS/SOLUTlONS/COMMENTS
              START  DATE    1/79     16UJFKENT:  BOILER-RELATED
              END  DATE      1/79     PROBLFM: NOT D E FINED/S PF CI F I ED
                            TFE BCILEfc WA < DOWN  TO REPAIR  TUBE LEAKS.
              AFFECTED  MODULES: SYSTEM

        ** PROfcLEMS/SOLUTJONS/COMflENTS
              STApT  OAjE    1/79     EQUIfMENT:  PUMP, OTHER
              END  D«TE      1/79     PROBLEM: NOT DEFINED/SPECIFIED
                            REPAIRS WERE  MDE ON THE TRAV  ANB  SPRAY PUMP  SYSTEMS.
              AFFECTED  MODULES: SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    1/79     teuiffENT:  RECYCLE PUMP
              END  DATE      1/79     PROBit«: NO* DEFINED/SPECIFIED
                            THE VENTURI  RECYCLE  PUMP LOST  POWER.
              AFFFCTED  MODULES: SYSTEM

        ** PRObLEMS/SOLUTIONS/COMMENTS
              START  DATE    1/79     EOUIFMENT:  PUMP, OTHER
              END  DATE      1/79     FRCE^En: NOT DEFINED/SPECIFIED
                            TlfE SCRUBfc'£R  1R*V PUWP HOTOR «tNT  TO 6RCUND.  THE ?C LOAD  CENTER TRIPPED.
                                                  212

-------
                                              EPA UTILITY F6D SURVEY:  DECEMBER  1978  - JANUARY 1979
                                            SECTION 3
                    DESIGN  UNO  PERFORMANCE DATA FOR OPERATIONAL  F6D  SYSTEMS
.........	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY  OPERABIL1TV  RELIABILITY UTILIZATION  X REMOVAL    PER   BOILER  F6D   CAP-
                                                                 SO?   PART.  HOURS HOURS  HOURS FACTOR


       ** PROBLEWS/SOLUTIONS/CCKMENTS
             START  DATE    1/79     EQUIPMENT: DUCTWORK
             END  DATE      1/79     PROBLEM: DESIGN-RELATED  PRESSURE  SURGES
                           THERE WAS SCRIBBER TRIP ON HIGH DUCT  PRESSURE.
             AFFECTED  MODULES: SYSTEM

       ** PBOBLEMS/SOLUTIONS/COMMENTS
             START  DATE    1/79     E6UIFKENT: DUCTWORK
             END  DATE      1/79     PROB LEM I D E SIGN-RE LATE D  PRESSURE  SURGES
                           A HIGH DUCT PRESSURE TRIP WAS RESPONSIBLE  FOR  A  SHORT  OUTAGE.  THE PRESSUR
                           SENSING LINES WERE CLEANED.
             AffECTtD  MODULES! SYSTE*

  2/79  SYSTEM       96.5         93.1        93.2        87.9                   672   634    591

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE    2/79     E8UIPMENT: PIPING
             END  DATE      2/79     PROBLEM: NOT DEFINED/SPECIFIED
                           THE FGD SYSTEK WAS DOWN TO REPAIR  LEAK  IN  THE  VENTURI  LINE.
             AFFECTED  MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/COKMENTS
              START  DATE    2/79     E6UIIKENT: FGD SYSTEM, GENERAL
              END  DATE      2/79     fFOB LEW: NOT DEFINED/SPECIFIED
                           THE F6D SYSTE* WAS FORCED OUT OF  SERVICE  DUE  TO  A ?8 LOAD CENTER POWER
                           LOSS.
              AFFECTED  MODULES: SYSTEM

        ** PROBLEMS/SOLUT10NS/COMMENTS
              START DATE   2/79     lOU!H»!ENTl PIPING
              END DATE      2/79     PROPtEM: NOT DEFINED/SPECIFIED
                           THE SCRUBBER *A S  FORCED DOWN DUE  TO  A BREAK IN THE ASH WATER CIRCULATING
                           WATER LINE RESULTING IN LOSS OF EMERGENCY  COOLING WATER.
              AFFECTED  MODULES: SYSTEM

        **  PR06LEMS/SOLUT10NS/CCMMENTS
              START DATE   2/79     tCUKCENT: SCRUBBER
              END DATE      2/79     PROBLEM: NOT DEFINED/SPECIFIED
                           Tfcf  F6D  SYSTEf  WAS  DOWN BECAUSE OF A  LEAK  ON  THE  VENTURI RACE TRACK AND
                           TC  CLEAN THE \ENTURI RACE  TRACK NOZZLES.
              AFFECTED  MODULES: SYSTEM

        ** PROBLEMS/SOLUTIONS/COMHENTS
              START DATE   2/79     EQUIfKENT: BOILER-RELATED
              END OjTE     2/79     PROBtfM: NOT DEFINED/SPECIFIED
                           THE BCILEK bAt  DOWN TO  REPftIR  A TUBE LEAK-
              AFFECTED MODULES: SYSTEf
                                                 213

-------
EPA UTILITY  ffcD  SURVEY:  DECEMBER l97f - JANUARY  1979
                                             SECTION  3
                     DESIGN AND PtRfOPMANCE  DATA  FOR OPERATIONAL f6D SYSTEMS
 COMPANY  NAPf
 PLANT  NAMF
 UNIT NUMBER
 CITY
 STATE
 REGULATORY  CLASSIFICATION
 PARTICULATE EMISSION LIMITATION - NC/J
 S02  EMISSION  LIMITATION - *t/J
 NfT  PLANT GENERATING CAPACITY - MW
 CROSS  UNIT  GENERATING CAPACITY - Mb
 NET  UNIT GENERATING CAPACITY W/FGD - Ml
 MET  UNIT GENERATING CAPACITY WC/F6C -  fW
 EQUIVALENT  SCRUBBED CAPACITY - KW

  •* BOILER DATA
      SUPPLIER
      TYPE
      SERVICE LOAD
      COMMERCIAL SERVICE DATE
      MAXIMUM BOILER FLUl GAS FLOW - CU.l"/S
      FLUE GAS  TEMPERATURE - C
      STACK HEIGHT - M
      STACK TOP DIAMETER - M

  •* FUEL DATA
      FUEL TYPE
      FUEL GRADE
      AVERAGE HEAT CONTENT - KJ/KG
      RANGE HEAT CONTENT - BTU/LB
      AVERAGE ASH CONTENT - »
      RANGE ASH CONTENT - Z
      AVERAGE MOISTURE CONTEM - t
      RANGE MOISTURF CONTENT - *
      AVERAGE SULFUR CONTENT - %
      RANGE SULFUR CONTENT - J
      AVERAGE CHLORIDE CONTENT - X
      RANGE CHLORIDE CONTENT - %
      FUEL FIRING RATE - M T/H
      FUEL FIRING RATE - MM

  •* MECHANICAL COLLECTOR
      TYpf
      SUPPLIER
      PARTICULATE DESIGN REMCVAl EFFICIENCY

  ** PARTICULATE SCRUBBER
      NUHPER
      TYPF
      SUPPLIER
      LINING MATERIAL
      TYPE Of NOHLFS
      BOILER LOAD/SCRUBBt* - X
      LIQUID RfcClRCULATlON RATE  - LITF.R/S
      L/6 RATIO - L1TER/CU.I"!
      PRESSURE DROP  - KPA
      SUPERFICIAL GAS VELOCITY - M/S

  •* F6D SYSTEM
      SALFABLE PRO DUCT/T HR OW AWAY PRODUCT
      GENERAL PROCESS TYPE
      PROCESS TYPE
      SYSTEM SUPPLIER
      A-E FIRM
      DEVELOPMENT LEVEL
      NEW/RETfiOFIT
      PARTICULATE DESIGN REMOVAL EFFICIENCY
      SO 2 DE$IKN REMOVAL EFFICIENCY  -  X
      COMMERCIAL DAT£
      INITIAL START-UP
      CONSTRUCTION IMITIAT10*
      CONTRACT  AWARDED

  «* ABSORBER
                    (  .100
                    ( 1.200 LP/MMPTU)
NEVADA POW5R
REID GARDNER
3
KOAPA
NEVADA
A
   41!.
  516.
*******
  125.0
  110.0
*******
  12?.0
     FOSTER  WHEELER
     PULVERIZED, BALANCED DRAFT
     BASE
      0/76
       ?E3.21        < 473000 ACFK>
       176.7        ( 350 F)
        61.          < ZCO FT)
     *******        (***** FT)
     COAL
     ******
      2B959.

         B.OO
     * *****
     ********
     ******
          .50
     0.5-1.0
     ***** ***
     ***** *

     *****
                <  1245G  BTU/LBJ
                (***
     MILTICLONES
     RESEARCH COTTRELL
  X     75.0
     VARIABLE THRQAT
     AOL/COMBUSTION EQUIP ASSOCIATES
     1NCOLOY 82S
     TANGENTIAL
   157.5
     1.3
     5.0
    50.3
                     (  2SOO
                     <10.0 GAL/1000ACF)
                     <    20  1N-N20)
                     (   165.0  FT/S)
      TYPF
      INITIAL START UP
     THROWAUAY PRODUCT
     WET SCRUBBING
     SODIUM CARBONATE
     ADI/COMBUSTION  EQUIP  ASSOCIATE
     BECHTEL
     FULL-SCALE
     NEW
- X     99.00
        85.00
      7/76
      6/76
      0/7*
      0/73
     PERFORATED  PLATE  WASHING  TOWER
      6/76
                                                 214

-------
                                             EPA UTILITY F6D SURVEY:  DECEMBER  1978  - JANUARY 1979
                                           SECTION 3
                   DESIGN  AND  PERFORMANCE  DATA FOP OPERATIONAL FGD SYSTEMS
NUMBER OF STAGES
DIMENSIONS
BOILER LOAD/APSORBER - X
LIQUID RECIRCULATION RATE
PRESSURE DROP - KPA
PART1CULATE OUTLET LOAD -



- LITER/S

NG/J
$02 DESIGN REMOVAL EFFICIENCY - X
1
30 DlA.
100.0
38.
.7
41703.
91.2



( 600 GPM)
( 3.0 IN-H20)
(97.000 LB/MMBTU)

** FANS
    NUMBER
    TYPE
    CONSTRUCTION MATERIALS

** WIST EljMlNATOR
    MUMPER
    TYPE
    CONFIGURATION
    MASH SYSTEM
    PRESSURE DROP - KPA

** RIHEATER
    TYPS
    HEATING KEDIUM
    TEMPERATURE  BOOST  -  C
    ENERGY REQUIRED

** MATER LOOP
    TYPf
    FRESH MAKEUP WATER ADDITION - LITERS/S

** DISPOSAL
    NATURE
    TYPE
    LOCATION
    AREA - ACRES

** DISPOSAL
    NATURF
    TYPE
    LOCATION
    TRANSPORTATION
    AREA  - ACRES
                                                I.D.  BOOSTER  FAN
                                                CARBON  STEEL
                                                 1
                                                RADIAL  VANE
                                                HORIZONTAL
                                                NONE
                                                      .1
C  .5  IN-H20)
                                                INDIRECT  HOT AIR
                                                STEAM
                                                    16.7         (   30 F>
                                                4  Ml*
                                                OPEN
                                                     1.6
                                                                (   25 GPP)
                                                 INTERIM
                                                 LINED  ASH  FOND
                                                 ON-SITE
                                                     6.0
                                                 FINAL
                                                 EV»P POND
                                                 ON-SITE
                                                 GRAVITY FLOW FROM 1NTERIW SLUDGE PON"
                                                    45.0
	.	PERFORMANCE DATA	
PERIOD MODULE AVAILABILITY  OPERABIL1TY  PLIABILITY UTILIZATION
                                                                 X  REMOVAL    PER  BOILER  FGD   CAP-
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR
 7/76  SYSTEK      45.Q         4t«0

       ** PROoLEMS/SOLUTIONS/COMKENTS
                                            70.0
                                                        42.C
                                                                              744   692
                                                                                           316
                           7/76      tOUIFHENT:  SCRUBBER
                           7/76      PROBLEM: NOT DEFINED/SPECIFIED
                           A  HIGH  SOLIDS  CONCENTRATION IN THE VENTURI SCRUBBING  SOLUTION  CYCLE  MAS
                           A  PROBLEM  DURING JULY.
                              J  SYSTEM          '
             START DATE
             END DATE


             AFFECTED

       **  PROBLEWS/SOLUTTONS/CCI"IHEN75
             START DATE   7/76     EQUIFftENT:  FGD  SYSTEM,  GENERAL
             END DftTF     7/76     PROPLFM: NOT DEFINED/SPECIFIED
                          FCUR OUTAGES  >ERE REPORTED  FOR  THE MONTH, THREF OF WHICH MERE FORCED
                          SCRUPBER OUTAffS.
             AFFECTED MODULES: SYSTEM
       ** PROaLEKS/SOLU1IONS/COK«!ENTS
             START DATE   7/76      EGUIfKENT:
             END DATE
                                                   SYSTEM,  GENERAL
                          7/76     CCKMtMTSr
                          ThE UNIT 3 SYSTEM WAS PLACED  IN  OPERATION ON JULY 1Z, 1976.  THE  SCRUBBING
                          SYSTEM DESIGN HAS BASED  ON  INFORMATION AND DATA OBTAINED FROM AN  SOOO-ACFM
                          PILOT PLANT PI-OGRAM  CONDUCTED AT THIS STATION IN 1??1 AND 19?Z.
             AFFECTED MODULES: SYSTtK
                                                215

-------
FPA UTILITY  F6D SURVEY: DECEMBER 197F - JANUARY  1979
                                              SECTION 3
                     DESltN  AND PERFCRMAt.CE  BATA  FOR OPERATIONAL  FGD SYSTEMS
	PERFORMANCE DATA	
PERIOD  MODULE AVAIIAPILITY  OPEPA&ILITY  FELIABILITY UTILIZATION   *  REMOVAL   PER   BOILER  ™"   ,?„«»
                                                                    S02  PART. HOURS  HOURS  HOURS  FACTOR



        .* PFOBLEMS/SOLUTIOKS/COMMENTS
              START  DATE    7/76     EQUIPMENT:  REAGENT HANDLING
              END D/TE      7/76     PROBLEM: NOT DEFINED/SPECIFIED
                            A BUcKET EltVfTOR MALFUNCTION WAS A PROBLEM DURING JULY.
              AFFECTED  MODULES: SYSTEM

        SYSTEM       56.0         «3.0        50.0        43.0                   7*4    744    3i3

        «* PROBLEMS/SOLUTIONS/COMKENTS
              START  DATE    6/76     E6UIH«ENT:  REHEATER
              END DOTE      8/76     PROBLFM: NOT DEFINED/SPEClFIED
                            SEMEATER KCTO-K BURNOUT RESULTED IN FGO OUTAGE TIME.
              AFFECTED  MODULES; SYSTEM

        ** PR06LEMS/SOLUTIONS/CCM1ENTS
              START  DATE    SJ76     EOUIfMENT:  SCRUBBER
              END DATE      E/76     PROPlEM: NOT DEFINED/SPECIFIED
                            DISTRUCTICN OF THE  VENTURI FLOOR  RESULTED IN FGO OUTAGE TIME.
              AFFECTED  MODULES: SYSTEM

        •* PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    6/76     EQUIPMENT:  FAN
              END DATF      6/76     PROBLEM: NOT DEFINED/SPECIFIED
                            FORCED SCRUBBER OUTAGE WFRE CAUSED BY  AN I.D. FAN ELECTRICAL MALFUNCTION
                            A*D I.D. FAN  INSULATION  PROBLEMS.
              AFFECTED  MODULtS: SYSTEM

        •* PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    8/76     tOUIf«ENT:  THICKENER
              END DATE      6/76     PROBLEM: CHEMICAL-RELATED PLUGGING
                            TUtrtNER TANK PLUGGING  RESULTED  IN  FGD  OUTAGE TIME.
              AFFECTED  MODULES: SYSTEM
  9/76  SYSTEM       49.0        46.0         46.0        44.0                    7?0   679    3t*

        »* PR06LEMS/SOLUTIONS/CCMMENTS
              START  DATE   9/76     EGUI »I"ENT:  SCRUBBER
              END  DATE      9/76     PROBtfM: NOT DEFINED/SPEClFI ED
                            A VENTURI VIBMTION  TRIP RESULTED  IN  FGD OUTAGE TIME.
              AFFECTED  MODULES: SYSTEM

        ** PROSLEKS/SOLUTIONS/COMMENTS
              START  DATE   9/76     E6UIFMENT:  F6D SYSTEM,  GENERAL
              END  DATE      9/76     CCKMfNTS:
                            THE SYSTEM KA S  PLACED BACK IN SERVICE  ON SEPTEMBER  IN  FOLLOWING Ej|TENSIV£
                            REPAIRS AND  M(DIFICATJONS FROM THE PRECEEOING MONTH.
              AFFECTED  MODULES; SYSTEM

        ** PCOBLEMS/SOLUTIONS/COMMEN1S
              START  DATE   9/76     E6U1FMENT:  REAGENT HANDLING
              END  DATE      9/76     PPOBiE«: NOT DEFINED/SPECIFIED
                            ThO REHEATER  IAN  TRIPS RESULTED  I* FGD OUTA6E TIME.
              AFFECTED  MODULES: SYSTEM

 10/76  SYSTEM       23.0        Z9.C         Z1.0        21.0                    744   5«g    159

        ** PROBLEMS/SOLUT10NS/CCMMENTS
              START  DATE  10/76     ECUIIMENT:  PROCESS CONTROL
              END  DATE     10/76     FROBIFH: NOT DEFINED/SPECIFIED
                            HIGH SOLIDS  CCNTENT  IN THE VENTURI RECYCLE SOLUTION RESULTED  IN OUTA6E

              AFFECTED  MODULES: SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE  10/76     EOUlfMENT:
              END  DATE     10/76     PROBLEM: COMPONENT FAILURE,  OTHER
                                                  216

-------
                                              EPA UTILITY  fGD SURVEY: DECEMBER 1978  -  JANUARY 1979
                                            SECTION  3
                     DESIGN  AND  PERFORMAME DATA FOR OPERATIONAL FGD SYSTEMS
	——	PERFORMANCE  DATA	
PERIOD HODULE AVAILABILITY OPEPAEIL1TY "(LIABILITY  UTILIZATION
                                                                  X REMOVAL   PER  BOILER   FGD   CAP-
                                                                  S02  PART. HOURS HOURS   HOURS  FACTOR
                           A SCRUBBER 6*? DAMPER MALFUNCTION RESULTED IN FGD OUTAGE  TIME.
             AFFECTED  MODULES: SYSTEM

       ** PROBLEMS/SOLU110NS/COMMENTS
             START  DATE   10/76     EQUIPMENT:  SCRUBBER
             END  DATE     10/76     PROP if n : NOT DEF1NED/SPF.CIFIED
                           VENTIRI BOX PHOEiLEMS RESULTED N  FGD OUTAGE TIME.
             AFFECTED  MODULES: SYSTEM
11/76   SYSTEM
                    28.0
            80.0
                        29.0
                        29.0
                                                           720
                                         264
        **  PRCBLEMS/SOLUT10NS/COHMENTS
              START  DATE  11/76     EOUIf^ENT:  SfRUBBER
              END DATE     11/76     PROB1EM: NCT  DEFINED/SPECIFIED
                           THE SCRUBBER  SYSTEM  WAS  NOT  IN OPERATION THE FIRST  HALF  OF  NOVEMBER  DUE  TO
                           REPAIRS ot L.E*KS  IN  THE  VENTURI SCRUBBER BOX.  THE  SYSTEM WAS  RESTARTED
                           NOVEMBER IV.
              AFFECTED  MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE  11/76     EfiUI tPiENT:  REAGENT  HANDLING
              END DATE     11/76     (-FCEUfM: NOT  DEFINED/SPECIFIED
                           A  SCREW COfVEYOR  MALFUNCTION  (PREVENTING CHEMICAL MIXING) RESULTED  IN F6D
                           OUTAGE TIME.
              AFFECTED  MODULES: SYSTEM
 12/74   SYSTEM
99.0
                                97.0
                         99 .0
                                                         97. 0
                                               744
                                                                                      744
                                                721
        •* PROBLEMS/SQLUTlONS/COMMENTS
              START DATE  12/76      fCUirf«ENT:  EXpAN$ION JOINT
              END DATE    12/76      F-fiOBlEMs NOT DE FINED/S PF cl F I £t>
                           ONE MINOR  SCRU.BER OUTAGE OCCURRED BECAUSE OF REPAIRS TO  THE  J.D. FAN
                           EXPANSION  JOI M .
              AFFECTED MOOL'LES:  SYSTEF
  1/77  SYSTEM
9B.O
                                             98. C
                        91.0
                                                                                744
                                                                                      690
                                                                         676
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    1/77      tBUirfitNT:
              END &ATE      1/77      F-rofiirM: CHEMICAL-RELATED PLUBEINE
                            A  PLU6SED  7RAV RESULTED IN F6D OlTAbE TIME..
              AFFECTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE    1/77      E6UJIKENT; REHEATER
              END DATE      1/77      FKG&lCM: NOT DEFINED/SPECIFIED
                            A  REHEATER STFAM LEAK RESULTED IN A MINOR  FORCED  QUTA6E.
              AFFECTED MODULES:  SYSTEM
  2/77  SYSTEM
81.0
74.0
72.0
63. n
                                                                                672
                                                                                      575
                                                                         422
        ** PROBLEMS/SOLUtlONS/COMFIENTS
              START DATE    2/77      IBUIffENT: ABSORBER
              END DATE      2/77      FPCR1.FM: NOT DEFINED/SPECIFIED
                            ThREE  FORCED  SCRUBBER OUTAGES WERE  CAUSED  t-1  PKOELFMS WITH THE UPPER TRAY.
              AFFFCTED MODULES:  SYSTEM

        ** PROfcLEMS/SOLUTIONS/COMMENTS
              START DATE    2/77      ESUirfENT: PIPING
              tND DATE      2/77      PPCEltM: NOT DEFINED/SPECIFIED
                            AK  OUTAGE RESILTED FOR CLEANING  OUT  THE  SOOIUM  CARBONATE LINE.
              AFFECTED MODULES:  SYSTIC:
  3/77  SYSTEM
44.0
             51.0
            52.0
                                     44.0
                                                                                744   679
                                                                                             324
        »* PROBiEMS/SOLUTlONS/COKWENTS
              START DATE    3/77      tCUlFP«ENT: F6D SYjlEM,  GENERAL
              END DATE      3/77      FPCBUM: I N STALLATION-RE LAT po  MATERIALS FAILURE
                                                 217

-------
EPA UTILITY  F6D  SURVE*: DECtHBER  1971  -  JANUAPY 1979
                                             SECTION 3
                     DESlfN  *ND  PERFOPKAHE  DATA fO" OPERATIONAL  FED SYSTEMS
                                            PERFORMANCE DATA
PERIOD  MODULE  AVAILABILITY  CPERABILITY  «LI*BILIIV UTILIZATION   '                 BOILER
                           UE  RUBBER  LIMNG IN T«E SEPARATOR REQUIRED  DOWNTIME FOR  CUR1N6.
              AFFECTED MODULES:  SYSTEI"

        ** PRObLEKS/SOLUTIONS/COMWENTS
              START DATE   3/77      I CUI f">ENT: EXPANSION JOINT
              END DATE     3/77
                           ThE  SCRURfcER  IAN EXPANSION JOINT  BLfcW  OUT  CAUSING OUTAGE  TIKE.
              AFFECTED MODULES;  SYSTEM

        ** PROBLEMS/SOLUT10NS/COMMENTE
              START DATE   3/77      I CHI I * ENT : ABSORBER
              END DATE     3/77      PROPiM: CHEMICAL-RELATED PLUGGING
                           MINOR OUTAGES  WERE CAUSED B* A PLUGGED TRAY.
              AFFECTED MODULES:  SYSTEM

        •« PROBLEMS/SOLUTIONS/COMMENTS
              STAeT DATE   7/77      Efil4lh>ENT: FGD SYSTEM,  GENERAL
              END DATC     3/77      FR(lP|E|t\; NOT 0 E F INgD /S ff CI F I ED
                           A  MINOR  OtTAS^ WAS CAUSED RY THE  6J5  LJMJT SWITCH TRIPPIN6.
              AFFECTED BOPUIES:  SYSTtf
  4/77  SYSTEM       C.6.0         f5.0        85.0        83. f!                   720    709     600

        •* PBOtlLEMS/SOLUTIONS/COMHENIS
              START  DATE    4/77      f PHI fKENT : ABSORBER
              END  DATE      */77
                            A  HIGH TRAY DIFFEHENTAL RESULTED  IN  F6D  OUTA6E T IMF .
              AFFECTED  MODULES:  SYSTEM

        ** PROOLEMS/SOlllTlONS/CnKMENTS
              START  DATE    
-------
                                              EPA UTILITY F6D SURVEY:  DECEMBER  1978  - JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL  F60 SYSTEMS
..	.......—..-_,._..„_...	PERFORMANCE DATA——
PERIOD MODULE AVAILABILITY  OPERAPILITY  RELIABILITY UTILIZATION
                                              X REMOVAL   PER  BOILER  FGD   CAP*
                                              S02  PART. HOURS HOURS  HOURS  FACTOR
                           A  HIGH  TRAY DIFFERENTIAL PRESSURE READING CONTRIBUTED  TO  FORCED  SCRUBBER
                           OUTAGES.
             AFFECTED MODULES:  SYSTEM
 7/77  SYSTEM
73.0
73,0
73.0
73.D
                                   7*4    74*
             5*2
       ** PROBLEMS/SOLUTIONS/CCMMENTS
             START  DATE    7/77      i«UI^ENT: F6D SYSTEM.
             END  DATE      7/77      COMMENTS:
                           FIVE  FORCED SCRUBBER OUTAGES MERE ENCOUNTERED  DURING  JULY.
             AFFECTED  MODULES;  SYSTEM

       ** PROBLEMS /-SOLUTI ON S/CCKMENTS
             START  DATE    7777      tOUIFKENT: VALVES
             END  DATE      7/77      PROBltM: NOT DEFINED/SPECIFIED
                           REPAIRS TC THE VENTURI DISCHARGE VALUE  CONTRIBUTED  TO FGD  OUTAGE  TIKF,
             AFFECTED  MODULES*  SYSTEM
  8/77   SYSTEM
70.0
63.0
63.0
sn.o
74*   629
                                                                                            375
        **  PROBLEMS/SOLimONS/COMMENIS
              START  DATE    £/77     ECUUMENT: PIPING
              END DATE     6/77     PROBLEM: NOT DEFINED/SPECIFIED
                           OLE TC A LEAK IN VENTURI RECYCLE  LINE  THE  UNIT  WAS  OFF LINE  PART OF THE
                           MONTH.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    7/77     EOUIFXENT: FAN
              END DATE     7/77     PROBtFM: DESIGN-RELATED  VIBRATION
                           SCRUBBER FAN  VIBRATION PROBLEMS  CONTRIBUTED  TO  FORCED SCRUBBER OUTAGES.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    8/77     EOUIfKENT: FGD  SYSTEM.  GENERAL
              END DATE     8/77     PROBLEM: NOT DEF1NED/SPECIFI ED
                           A  FALSE ALARM DUE TO SCRUBFtR  OUTLET  TEMPERATURE CAUSED SHUTDOWN FOR ABOUT
                           A  DAY.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COKKENTS
              START  DATE    E/77     tGDIf^ENT: BOILER-RELATED
              END DATE     B /77     FROBi.Fn: NOT DEFINED/SPECIFIED
                           T*E BClLEf WAI OUT OF SERVICE  FOR ABOUT  A  WEEK  DURING
              AFFECTED MODULES: SYSTtf
  9/77  SYSTEM
 90.0
             90.0
             99.0
             90.0
                       720   720
                                                                                            646
        ** PROBLEWS/SOLUTIONS/COMMENTS
              START DATE   9/77     teillfKENT:  PROCESS  CONTROL
              END DATE     9/77     PFCBUM: NOT  DEFINED/SPE CI FIfcD
                           H16H SOLIDS  If  THE  VENTURI  RECYCLE SYSTEM CAUSED SOME OUTAGE TIME IN
                           SEPTFMBER.
              AFFFCT&D MODULES: SYSTEM

        «* PROBLEKS/SOLUTIONS/COMMENTS
              START DATE   9/77     EGUIFPENT:  PIPING
              END D«TF     9/77     PROBLEM: NOT  DEFINED/SPECIFIED
                           NEW EFFLULKT  MD POST  NEUTRALIZATION LINES WERE INSTALLED.
              AFFECTED MODULES: SYSTEM
 10/77  SYSTEM
 99.0
 90.0
 99.0
                                     61.0
                                                                               744
                                                      506
                                                                                            A55
        ** PROBI.EKS/SOLUTIONS/COMMENTS
              START DATE  10/77      E«UIIMENT:  BOI LF.R-RELATE 0
              END DATE    10/77      COKMtNT:  PREVENTIVE  MAINTENANCE SCHEDULED UNIT OUTAGE
                           THE SCRUBUFR  MS  DOWN 28*«*2  HOURS DURING OCTOBER FOR A SCHEDULED  BOILER
                                                 219

-------
EPA UTILITY FED SU»VFY: OECt^BER  1<97f  -  JANUARY 1979
                                            SECTION  3
                    DESIGN  AKD  PFRFORMKE  DATA  FOR OPERATIONAL FGD SYSTEMS
	PERFORMANCE  DATA	
PERIOD MODULE  AVAILABILITY  CPEPAt'ILITY  KFLIARILITY  UTILIZATION  X REMOVAL   PER  BOILER  fGD    CAP,
                                                                 S02  PART. HOURS HOURS  HOURS  FACTOR

                           OUTAGE.
              AFFECTED  MODULES:  SYSTEM

       *» PROBLE»"S/SOLUTIONS/COMMENTS
              START  DAlE   10/77      tCUIH«ENT:  FAN
              tND  D*TT     10/77      FFCEiM: DESIGN-RELATED VIBRATION
                           4.45  HOURS  OU1AGE TIME  OCCURRED AS A RESULT OF HIGH VIBRATION PROBLEMS ON
                           A SCRUPBF.F  MS.
              AFFECTED  MODULES:  SYSTEM

11/77  SYSTEM      89.0         88.0        89.0        87.C                  720   709    62*

       • • PKOBLEMS/SOLUTIONS/COMMENTf                  " "             .     ,     ..  .
              START  (AT?   11/77      EQUIPMENT:  VALVFS
              END  DATE     11/77      PROEUKM: NOT D E FINED/S FT C) F I ED
                           THF  SCRUBEF.K  .AS  DOWN ROUGHLY 6Q HOURS FOR THE INSTALLATION OF AN OUTLET
                           NOZZLE IN THF BOOSTER TANK.
              AFFFCTED  MODULES:  SY$TEM

        »*  PRO&LEMS/SOLUTIONS/COMMEN1S
              START  DATE   11/77      EOU1WENT:  BOILER-RELATED
              END  DATE     11/77      PROOUM: NOT DEFINEB/SPECIFIED
                           THE  pOILfk ME OUT OF SERVICE APPROXIMATELY 15 HOURS IN NOVEMBER.
              AFFECTED  MODULES:  SYSTEM

12/77   SYSTEM      BR.O         92.0        96.0        93.0                  7*4   692    633

        **  PR08LEMS/SOLUTIONS/COMMENTS
              START  DATE   12/77      tCUIMENT:  INSTRUMENTATION
              END  DATE     12/77      PFOElEMr NOT DEFINED/SPECIFIED
                           A FAULTY THERMOCOUPLE CAUSED "SEPARATOR HI6H TEMPERATURE" WHICH IN TURN
                           CONTRIBUTED  TC FGD OUTAGE TIME.
              AFFF.CTED  MODULES:  SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   12/77      E6UIFKENT:  BOILFR-RELATED
              END  DATE     12/77      ffORiM: NOT DE FINED/SPF CI FI ED
                           BOILER OUTAGE TIME AMOUNTED TO 51 HOURS IN DECEMBER*
              AFFECTED  MODULES:  SYSTEM

        **  PROeLEMS/SOLUTIONS/CCMMENTS
              START  DATE   1J/77      EGUII'IENT:  SPRAY NOZZLES
              END  DATE     12/77      FPOPlfM; NOT DEFINED/SPECIFIED
                           TKE INSTALLATION OF  TRAV SPRAY STRAINER CONTRIBUTED TO FGD  OUTAGF TIME.
              AFFECTED  MODULES:  SYSTEM

        •*  PROclLEMS/SOLUTIONS/COMMENTS
              START  DATE   12/77      EGUIF^ENT:  INSTRUMENTATION
              tND  DATE     12/77      FRORl.FMi NOT DEFINED/SPECIFIED
                           INSTALLATION CF NEW  SENSING LINES CONTRIBUTED TO F6D OUTAGE TIME.
              AFFECTED  MODULES:  SYSTEM

  1/7P   SYSTEM     100.0        100.0       100.0       100.C                  7*4   744    740

        •*  PftOfiLEMS/SOLuTlONS'COMMENTS
              START  DATE    1 /7f      eQUjfENTf
              END  DATT      1/78      PROBHMt CHEMICAL-RELATED PLUefilNC
                           A PLUGGED VIN1URI N02ZLE  CAUSED THE ONLY  F60 OUTAGE DURING  J*NUA«».
              AFFFCTED  MODULES;  SYSTEM

        **  PROBUMI/80LUTIONS/COMMENTS
              START  DATE    1/7B      ESUI^ENT:  BOILER-RELATED
              END  DATE      1/71      COMMtNTSl
                           T>( POILFh OPffiATED  THE INT1BE MONTH WITH  NO OPERATIONAL  PROBLEMS.
              AFFFCTtD  MODULES!  SYSTEM

  2/76   SYSTEM      96.0         95.0        95.0        88.P                  672    619     S88
                                                220

-------
                                              EPA  UTILITY  FGO  SURVEY:  DECEMBER 1978 - JANUARY 1579
                                            SECTION  3
                    DESIGN AND PERFORMAKCE  DATA  FOR OPERATIONAL FCD SYSTEMS
..._.....- ------- — --- - ------------------ PERFORMANCE  DATA -------------------------------------------
PERIOD MODULE AVAILABILITY  OPERABILITY  PLIABILITY  UTILIZATION   X REMOVAL   PER  BOILER  F6D   CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR


       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   2/78      18UIIWENT:  SCRUBBER
             END DATF     2/78      PPOBICM:  NOT DEFINED/SPECIFIED
                          AK  FGo  SYSTEM  OUTAGE  DUE  TO  A HIGH VENTURI TEMPERATURE (CAUSED BY FAULTY
                          WIRING)  OCCUR t!:»  DURING  FEBRUARY.
             AFFECTED MODULES:  SYSTtM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   2/78      EBUIfWENT:  INSTRUMENTATION
             tNO DATE     ?/78      PROBlEM:  NOT DEFINED/SPECIFIED
                          A MINOR  OUTAGt WAS NECESSARY TO CHECK THE VENTURI TEMPERATURE INDICATOR.
             AfFfCTED MODULES:  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   2/78      EQUIPMENT:  TANK, OTHER
             END DATE     2/78      PROBUM:  CHEMICAL-RELATED PLUGGING
                          AK  FGD  OUTAGE  WAS  CAUSED  BY  PLUGGING OF THE MIX TANK WHICH MADE IT IMPOS-
                          SIBLE TO OIX  CHEMICALS.
             AFFECTED MODULES:  SYSTEM

  3/78  SYSTEM      97.0         97.0        97.0        >96.0                  7**   7*1    718

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    J /78      E6UIFMENT:  TANK, OTHER
              END  DATE      3/76      F-RGBUK: C HIM1 C AL-HFLA TE D PLUGGING
                           THE MIX TANK  H'OBLEM CONTINUED INTO MARCH CAUSING THE ONtV FGD DOWNTIME
                           FOR THE MONTH.
              AFFECTED  MODULES!  SYSTEM

        »*  PROSLEMS/SOLUtlONS/COMMENIS
              START  DATE    3/78      tCUIWENT: BOILER-RELATED
              END DATE      3/7S      PROBLEM: NOT DEFINED/SPECIFIED
                           A FURNACE HIGf/LOW PRESSURE  TRIP CAUSED A BOILIR OUTAGE OF 6 HOURS.
              AFFECTED  MODULES:  SVSTtP

  4/78  SYSTEM       97.0         89.0        97.0        87. C                  720   7()4    «29

        **
              START DATE   4/78     ECUUMENT: SPRAY NOZ2LIS
              END DATE     4/7fc     PKOB LEU : NOT DEFINED/SPE C] F IID
                           THE FGD SYSTfiK WAS DOWN 'OR REPAIRS ON THE W6NTURI IMIRSeNCY SPRAY SYSTEM.
              AFFECTED MODULES: SYSTEM

        ** PROBLEKS/SOLUTIONS/COMMENTS
              START DATE   4/78     [CLlll«ENT: BOILFR-RFLATE D
              END DATE     4/76     PRCFfM: NOT HE FINED/S PE CI F I ID
                           TK POlLtK UA i DOWN APPROXIMATELY 70  HOURS DURING APRIL.
              AFFtCUD MODULES! SYSTEM

  3/7E  SYSTEM      97.0        77.0        96. 0        66. C                  744   6t&    494

        **
              START DATE   S/78     IPUIffiENTi BOHF.R-RELATB D
              IND D«TF     J/7R     COMMENT: PREVENTIVE MA1NTINANCE  SCHEDULiD  UNIT OUTAQF
                           THERE WAS A SCHEDULED OUTAGE OF  nO  HOURS  FOR ROHIS  MAINTENANCE  DURING
                           MAY.
              AFFCCTED MOBULiSl SYSTfM

        ** PROgLEMS/SOLUTIONS/COMMENTS
              START DATE   ! /7I     TSUI fH'INT! IN8THUMENTAT10M
              tND DATE     5/78     FFCgLFMt NOT DE riNED/SPf CI FI ED
                           All FfiD FCKtfct PUTA&E RiSULTED FROM  A  FAULTY  TEMPiRATUNt "KOBE  AT  THI
                        ,   VENTUH, DlfilNf MAY.
              AFFfCTED MODULES! SYSTEM

        SYSTEM     100.0        9A.O        96.0        98. P                   7ZO    715     «B6
                                                221

-------
EPA UTILITY  FGD  SURVEY: DECEMBER  197f  - JANUARY 1979
                                             SECTION 3
                     DESIGN  *KD  PERFORMI.CE DATA FOR OPERATIONAL F6D SYSTEMS
			PERFORMANCE  DATA	—	..-...-...
PERIOD  MODULE  AVAILABILITY  OFEKAE-IL1TY  (EL1ABILITY UTILIZATION   * REMOVAL   PER   60JLFR  fGP   CAP.
                                                                   SO;  PART. HOURS  HOURS  HOURS FACTOR


        **  PRObLEMS/SOLUTlONS/COMMENTS
              START DATE   6/78      EeUIHENT: B01LFR-RELATFH
              END DATE     fc/78      PF6BKH: NOT D E F JNE D /S PE CIF I ED
                           A  HIGH/LCI.  FU'MACE PRESSURE  TRIP  RESULTED IN BOIIE  DOWNTIME.
              AFFECTED MQDUlES:  SYSTEM

        **  PR06LEMS/SOLUT10NS/COM1ENTS
              STAPT DATE   t /78      tBUU'ENT: AUXILIARY  EOUJPMENT
              END DATE     6/78      PFOBUM: NOT DEFINED/SPEClFI ED
                           A  SCHEDULED  FID OUTAGE OCCURRED  WHEN  THE FIRE SPRAY SYSTEM  WAS OUT OF
                           SERVICE.
              AFFCCTED MODULES:  SYSTEM

  7/78   SYSTEM     100.0         60.0       100.0         7?.0                    744    726    58J

        •*  PROBLEMS/SOLUTlONS/COMWENTS
              START DATE   7/78      t6Ulf«ENT: SCRUBBER
              END DATE     7/78      PFOFJlfM: NOT DEFINED/SPEc'*I ED
                           LOU VEK'TURl  FlOU CAUSED  AN  FED OUTAGE.  THIS WAS CORRECTED  WHEN THf RACE
                           TRACK WERE  CLEANED.
              AFFECTED WOOULES:  SYSTEM

        **  PROBLEWS/SOLUTIONS/COIKMENTE
              START DATE   7/78      EOUJFPENT: BOILER-RELATED
              END DATE     7/78      CCH*l,NT: PREVENTIVE  MAINTENANCE SCHEDULED  UNIT OUTAGE
                           A  SCHEDULES  OI.TA6E TO CLEAN  THE  TURBINE LUBE OIL COOLERS  OCCURRED OURIN6
                           JULY.
              AFFECTED HODULES:  STSTEK

        **  PROBLEMS/SOLUTIONS/CrcnEMTS
              START DATE   7/78      EGUI'K'ENT: TANK, OTHER
              END DATE     7/78      PFOPIEM: NOT DEFIKED/SPECIFI ED
                           AK OUTAGE WAS RE8UIRE6 FOR  INSPECTION  OF THE VENTURI  TANK AND RACE TRACK.
                           CURINC THE OUTAGE THE TAMK  AND RACE  TRACK NOZZLES WERE  CLENED ANt> THE
                           RUBBER LIMNC ON THE VENTURI  SPOOL WAS REPLACED.
              AFFECTED MODULES;  SYSTEM

        **  PROBLEKS/SOLUTIONS/COPMENTS
              START DATE   7/78      EOUIFKENT: $£RUeBER
              END DATE     7/78      PROBLEM: NOT DEFINED/SPECIFIED
                           AN OUTAGE WAS REQUIRED TO CLEAN  THE  VENTURIRACF TRACK;
              AFFECTED MODULES:  SYSTEM

  8/78  SYSTEM      9R.O         93.0        98.0         97.0                   744    736    721

        **  pROBLEMS/SOLUTIONS/COMMENTS
              START DATE   M78      EGUIfPENT: BOILER-RELATEfi
              END DATE     S/78      PROBtKM: NOT DEFINED/SPECIFIED
                           ONE FORCED BOILER OUTAGE OCCURRED DUE TO HIGH  FURNACE  PRESSURE*
              AFFECTED MODULES:  SYSTEM

        **  PROBLEMS/SOLUTIONS/COMHENTS
              START DATE   8/78      tSUU'WENT: FAN
              END DATE     P/7E      FFGBIEM; DESIGN-RELATED PRESSURE SURGES
                           THE SCRUBBER  MS FORCED  OFF  LINE ON AUGUST  26  DUE TO  HIGH SCRUBBER  FAN
                           OUTLET PRESSURE.  THE SCRUPBER PRESSURE SENSING LINE  WAS CLEANED.
              AFFECTED MODULES:  SYSTEM

        **  PHOBLEMS/SOLUTJONS/COMMENTS
              START DATE   8/78      (CUIFWENT: FGD  SYSTEM, GENERAL
              END DATE     5/78      PROBLEM: NOT DEFINED/SPECIFIED
                           OK AUGUST 2V  1HE SCRUBBER EFFLUENT SOLIDS LEVEL HAS HIGH CAUSING  AN OUTAGE
                           OF APPROXIMATtLY FIVE HOURS.  THE SYSTEM WAS  FLUSHED  TO CORRECT THE
                           PKoBlEM.
              AFFECTED MODULES:  SYSTEM

  9/7P   SYSTEM     100.0         97.0        100.0         32.0                   720   236    22R



                                                 222

-------
                                              EPA UTU1TY f6C  SURVEY:  DECEMBER 1978 - JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL  FED SYSTEMS
	PERFORMANCE DATA	
PEPIOO MODULE AVAILABILITY  CPERABILITY F-EL1A61L1TY UTILIZATION   X  REMOVAL   PER  BOILER  F6|>    CAP.
                                                                  SO?  PART. HOURS HOURS  HOURS  FACTOR
_...•___ ______ ____________  ___________ ____________ __•. — ___ — -—_  _____  _____ _____ ______ _____  _____•,

       ** PROblEMS/SOLUTlONS/COMWENTS
             START  DATE   9/78      ECUKMENT: BOILER-RELATED
             END DATE     9/78      COHMIN'T: PREVENTIVE MAINTENANCE SCHEDULED UNIT OUTAGE
                          TtiE  HMT UEKT HOUN ON SEPTEMBER 10  FOR A TURBINE OVERHAUL WHICH LASTED
                          THROUGH THE END OF THE MONTH.
             AFFECTED  MODULES:  SYSTEM
10/78  SYSTEM
100.0
                                    7*4
        ** PROBLEMS/SOLUTIONS/COMMENU
              START  DATE   10/78      E6UIIMENT: BOILER-RELATED
              BN»  DATE     10*7*      COMM £NT : P Rf VE NT1VE MAINTENANCE  SC-HEDULED UNIT OUTAfiE
                           T*E UNIT WAS ilO.N THE ENTIRE MONTH  OF  OCTOBER FOR TURBINE OVERHAUL.
              AFFECTED  MODULES:  SYSTEM
 11/78   SYSTEM
 98.0
                                91.0
 91.0
                                      63.
                       720    489
             447
        »*  PRObLEMS/SOLUiIONS/COMMENTS
              START  DATE   11/78     ESDI THEN1!: BOtLER-RELAT E I)
              END DATE     11 /7B     COMMINTS:
                           THE UNIT WAS iROUSHT SACK ON  LINE  THE  10TH OF NOVEMBER*
              AFFECTED  MODULES: SYSTEM

        **  PROeiEMS/SOLUTIONS/COMWENTS
              START  0*TE   11/78     ESUIfMENT: INSTRUMENTATION
              END DATE     11/76     PROF I'*: NOT DEFINED/SPECIFIED
                           THE FED SYSTEI" WAS DOWN  AgOUT 3  HOURS  FOR REPAIRING VENTURI TEMPERATURE
                           PhOBES.
              AFFECTED  MODULES: SVSTEPi
 1Z/7S   SVSTfM
100.0
             100.0
100.0
100.0
744   744
                                                 744
        *»  PROBLIMS/SOLUTION5/COKMENTS
              START DATE  1?/78     ISUIH'ENT:  F6D  SYSTEM,  GENERAL
              tND DATE    U/7B     COMMENTS:
                           NO FGD OUTAbES WERE  REPORTED  DURING DECEMBER.
              AFFECTED MODULES: SYSTEM
  1/79  SYSTEM
                    66.4
                                67. Z
                                             67.2
                                                         66.4
                                                                               744
                                                                   735
                                                                                            494
        ** PRO&LEKS/SOLUTIONS/COMMENTS
              START DATE   1/79     CGUIIHENT:  SCRUBBER
              END DMF     1/79     PFCBOM: NOT  DE FINtD/SPE CI F HD
                           OUTAGE TIKE W/S MCPSSARY  TO  REpAIP  A HOLE IN THE VENTURI BOX.
              AFFECTED MODULES: SYSTEM

        »* PROSLEMS/SOLUTIONS/COMMENIS
              START DATE   1/79     EIGUItKENT:  PROCESS  CONTROL
              END DATE     1/79     PCOBtFM: HOT  DEFINED/SPECIFIED
                           TkO FORCFO OUTAtfS OCCURRED  BECAUSE  EFFLUENT SfiLI&S WERE  HIGH.
                           V«S CLF.ANEO.
              AFFECTED MOPUlfS: SYSTtK
                                                                          THE SYSTEM
        ** PRObLEMS/SOLUTIONS/COMMENTE
              START B*Ti   ?/*9     EfiUIfMENT:  FAN
              END DATE     2/79     PPOBlFM:  COMPONENT  FAILURE, OTHER
                           A MAJOR OUTAF.I:  OCCURED  WHEN  THf  SCRUBBER RCHEATER FAN MOTOR  BURNT  OUT.
              AFFECTED MOCULfS: SYSTEM
  2/7*  SYSTEM
                    40.6
                                45.7
                                             45.7
                                      40.6
                                    672   660
        ** PROBLEMS/SQLUTIONS/CfWENTS
              START CATS   ?/79      ERUIIWENT:  REMEATFR
              END D»TE     2/79      FROBIP.M:  NOT DEFINED/SPECIFIED
                           A STFAM LEAK  3K  THE  SCRUBBFR REHEATER COIL RESULTED  IN  OUTAGE  TIMf.
              AFFFCTiD MODULES:  SYSTEf
                                                 223

-------
FPA UTILITY  FtD SURVEY: DECt^BFR  197£ - JANUARY  19?9
                                              SECTION  3
                     OES16N  AND  PE R F Of* A (*C E  DATA  FOR OPERATIONAL  FGD  SYSTEMS
	PERFORMANCE DATA	
PERIOD  MODULE AVAILABILITY  OPERABILITY  (PLIABILITY  UTILIZATION   I  REMOVAL   PER  BOILER  F6D   CAP.
                                                                    S02   PART. HOURS HOURS  HOURS  FACTOR


        »*  PROBLEMS/SOLUTIONS/COMNENTS
              START DATE    ?/79     EGUir*£NT;  SCRUBBER
              IND DATE      ?/79     PPOP I m s NOT  D E FI N ED /S PE CI F I ED
                            T*E FGD SYSTEC WAS  OFF  F0«  A FEW HOURS TO  REPAIR A LEAK  IN  THE VENTURI
                            L INt.
              AFffCTfcD «ODULt5: SYSTEM

        **  PRObLEHS/SOLUTION5/COMMEN7S
              START DATE    ?/79     EOUIFPENT:  PIPING
              END DrTF.      3/79     FROB I.HH : NOT  DEFINED/SPECIFIED
                            IK SCRUPfjER  kAS DOWN  TO  REPAIR LEAKS  IN EFFLUENT AND VENTURI LINES.
              AFFECTED MODULES: SYSTtK

        • •  PROBLEMS/SOLUTIONS/COWt'ENTS
              START DATE    2/79     FGUIff'ENT:  B01 L ER-REUA T F D
              END DATE      Z/79     PPOBiKM: DESIGN-RELATED PRESSURE  SURGES
                           THb SCRUBPtR W f>S OFF  WITH  HIGH FURNACE  PRESSURE ON THE BOILER.
              AFFC CTED MODUl EE: SYSTEM

        **  PROBLEKS/SOLUT10NS/COKMENTS
              START DATE    2/79     tOOIffENT:  SCRUPBFR
              END DATE      J/79     PKCBlEH: NOT  0EFIN ED/SPFCIFI ED
                            ThE RACE TFACt NOZZLES  WERE CLEANED.
              AFFECTED MODULES: SYSTEM
                                                  224

-------
                                             EPA UTILITY F6D SURVEY:  DECEMBER  1978 - JANUARY 1979
                                           SECTION 3
                   DESIGN AND  PERFORMANCE  DATA FOR OPERATIONAL FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PAftTICULATE EMISSION LIMITATION  -  hG/J
S02 EMISSION LIMITATION -  H6/J
NET PLANT GENERATING CAPACITY  -  nw
6ROSS UNIT GENERATING  CAPACITY - flk
NET UNIT GENERATING CAPACITY  W/FGD - Mi
NET UMIT GENERATING CAPACITY  WO/FGt>  - *H
EQUIVALENT SCRUBBED CAPACITY  - NU

** BOILER DATA
    SUPPLIER
    TYPE
    SERVICE LOAD
    COMMERCIAL SERVICE  DATE
    MII-KUM 60HER FLUE GAS  FLOW - CtJ.t/S
    FLUE GAS TEMPERATURE  - C
    STACK HEIGHT  - M
    STACK TOP  DIAMETER  -  M

**  FUEL  DATA
    FUEL TYPE
    FUEL 6RADE
    AVERAGE HEAT  CONTENT  - KJ/KG
    RANGE HEAT CONTENT  -  BTU/lb
    AVERAGE ASH CONTENT  • t
    RANGE ASH  CONTENT  -  X
    AVERAGE MOISTURE CONTEhT  - *
    RANGE MOISTURE CONTENT -  X
    AVERASE SULFUR CONTENT -  X
     RANGE SULFUR  CONTENT  - %
     AVERAGE CHLORIDE CONTEKT  - X
     RANGE CHLORIDE CONTENT -  V.
     FUEL  FIRING RATE - M  T/H
     FUEL  FIRING RATE - WW

 **  ESP
     NUMBER

 **  PARTICULAR  SCRUBBER
     NUMBER
     TYPE
     NUMBER  OF  STAGES

 **  FGD SYSTEM
     SALEABLE  PRODUCT/THR OW AWAY PRODUCT
     GENERAL  PROCESS  TYPE
     PROCESS  TYPE
     PROCESS  ADDITIVES
     SYSTEM  SUPPLIFR
     A-E FIRM
     CONSTRUCTION  FIRM
     DEVELOPMENT LEVEL
     NEW/RFTROFIT
     PABTICULATE DESIGN REMOVAL EFFICIEfiCY
     S02 DESIGN REMOVAL EFFICIENCY  - X
     COMMERCIAL DATE
     INITIAL  START-UP
     CONSTRUCTION  COMPLETION
     CONSTRUCTION  INITIATIOK
     CONTRACT  AWARDED

 **  ABSORBER
     NUMBER
     TYPE
     INITIAL  START UP
     NUMBER  OF  STAGES
     BOILER  LOAD/APSORBER  - X
     GAS FLOW  - CU.M/S
     GAS TEMPERATURE  -  C
     PARTKULATE  REMOVAL EFFICIENCY  - X
     S02 DESIGN REMOVAL EFFICIENCY  - x
NORTHERN INDIANA  PU6  SERVICE
DEAN H. MITCHELL
11
GARY
INDIANA
C
  115.0
  115.0
  115.0
***** **
  115.0
******
BASE
 5/7C1
  217*07
  14P.9
******
C<>AL
******
 25JS6.

********
10.
   11.00
                (******  LB/MHDTU)
                {******
<  4-60000 ACTM') '
(  300 F)
(**** FT)
{***** FT)
( 11000 BTU/LP)
 ******
    3.50
3.2-?.5
********
******
   45.3
*****
( 50 TPH)
VARIABLE  THRoAT  VtNTURl
     1
 SALEABLE  PRODUCT
 WET  SCRUG&ING
 UELLMAN LORD
 SODIUM  SULFITE-BISULFITE
 DAVY POWERGAS
 DAVY POtaERGAS
 DAVY POWERGAS
 DEMONSTRATION
 RETROFIT
   9ft.5o
   9P.OO
  6/77
  7/76
 12/75
  8/74
  6/72
 VALVF  TRAY-COLLECTOR TRAY
  7/76
   100.0
   198.20
   H2.2
    9E.O
    91.0
< 420000 ACF«)
(  288 F)
                                                225

-------
EPA UTILITY  F&D  SURVEY: DECtKSER lQ7f  -  JANUARY 1979
                                             SECTION J
                     DESIGN AND PERFCRMr.CE  DATA FOR OPERATIONAL  FGD  SYSTEMS
    CENTRIFUGt
      NUMPER
      TYPE
      SODIUM SOLFITt CRYSTAL REMOVAL
     FANS
      NUMBER
      TYPE
                                                  BOOSTER
     FANS
      NUMBER
      TYPE
                                                  BOILER l.D.
     PUMPS
      SERVICE

      DISSOLVING TANK TO ABSORBER  FEED  T
      FLYASH PUR6F TO POND PIMP
      RECYCLE
      EVAPORATOR-CRYSTALLIZES  FEE9
      ABSORBER FEED
      NUWBFR

      ****
      tut
         3
      ***»
      * * **
     TANKS
      SERVICE

      ABSORBER FEED TANK
      ABSORBER SURGE TANK
      NACC3 MAKEUP, NA2S03  DISSOLVING

     REHEATER
      TYpE
      TEMPERATURE BOOST  -  C
      NUMBER

      ****
      ****
      ****
      DIRECT COMBUSTION
         27,f         (    5r  F)
     WATER LOOP
      TYpE

     REAGENT PREPARATION  EQUIPMENT
      POINT OF ADDITION

     BYPRODUCTS
      BYPRODUCT NATURE
      BYPRODUCT 8UALITY  - X
      CLOSED
      PNEUMATIC CONVEYOR
      ELEMENTAL SULFUR
         99.9
 PERIOD NODULE AVAILABILITY  CPERABILITY
PERFORMANCE DATA	
         UTILITATION
T REMOVAL   PEP   BOILER  FGD   CAP.
S02  PART. HOURS  HOURS  HOURS FACTOR
 11/76  SYSTEM
        • * PROBLEMS/SOLUTlONS/COC^ENTSi
               START  DATE   11/76     EOUIF^ENT:
    F6D SYSTEM,  GENERAL
               fcND  DATE      7/77
                            FOLLOWING COMFlETjON OF  CONSTRUCTION  IN MID-1976, START-UP  OF  THE VARIOUS
                            SUBSYSTEMS AN:: COMPONENT PARTS  WAS  IN1T1ATFD*  DURING THE PERIOD  JULY
                            THROUGH NOVEMBER, THREE  SUSTAINED  RUNS OF THE SO? A8SORBCR  AND REGENERATE
                            SYSTEM UNDER M3RMAL OPERATING CONDITIONS WERE ACHIEVED.   SO 2  REMOVAL EFFI-
                            CIENCY HAS EOl«L TO OR GREATER  THAN THE 9QX PERFORMANCE  CRITERIA.  UNIT 11
                            BOILER OPL«AT:p 121 FULL DAYS AND  10  PARTIAL DAYS.  THE  VCLLMAN-LORD $02
                            RECOVERY UNIT OPERATED 71  FULL  DAYS AND 23 PARTIAL DAYS. DURING  THIS PER-
                            ICD, NUMEROUS MODIF I CATIONS  AND CORRECTIONS TO THE SYSTEM HERE COMPLETED.
                            THESE INCLUDED MODIFYING THE ABSORBER KOcH VALVE TRAYS  TO IMPROVE TURN-
                            DCWN, RUBBER LINING THE  BOTTOM  ABSORBER COLLECTOR TRAY,  RELOCATING AND IM-
                            PROVING TEMPERATURE CONTROL  OF  THE  LOW PRESSURE STEAM SUPPLY,  INSTALLING
                            IMPROVED SO? .'AMPLF PROBES  AND  SEVERAL REPLACEMENTS AND  MOD IF I CAT ION« TO
                            T*E PURGE SALT RECOVERY  AREA.   FULLY  INTEGRATED OPERATIONS  INCLUDING SOZ
                            REDUCTION AND SULFUR RECOVERY OCCURRED IN NOVEMBER, 1V76.   JANUARY THROUGH
                            MAY 1977 - UNJT 11  BOILER  WAS OUT-Of-$ERVICE FOR ABOUT  FIVE BONTHS FOLLOH-
                            It.fi A BOILLR-i ELATED MISHAP  WHICH  OCCURRED ON JANUARY 15, 1977, DURING
                            START-UP AFTEF A SCHEDULED  MAINTENANCE TURN AROUND.

                            OK JUNE 13, 1'77 FGD OPERATIONS RESUMED  FOLLOWING RETURN TO FULL SERVICE  0
                                                  226

-------
                                             EPA UTILITY FGt SURVEY:  DECEMBER  1*78  - JANUARY 1979
                                           SECTION 3
                   DESIGN  AND  PERFORMANCE  DATA FOR OPERATIONAL F60 SYSTEMS
._.__.— — .- — ----- -— ------ ....—..-..PERFORMANCE 6 AT A --- -
PERIOD NOODLE AVAILABILITY  OPERABILITY  PLIABILITY UTILIZATION
                                                                 t REMOVAL
                                                                 502  PART.
                                                                             PER   BOILER  FGD   CAP'
                                                                            HOURS HOURS  HOURS FACTOR
                         UNIT  11  BOUEH.   BY JUNE 15 FULLY INTEGRATED OPERATION OF  THE  ENTIRE FGP
                         PLANT WAS  ACHIEVED.  THROUGH JUNE AND JULY*  SEVERAL  HUNDRED HOURS OF TOTAL
                         S1STEM OPERATION AT BOTH PARTIAL AND FULL LOAD  WERE  ACCRUED*
            AFFECTED MODULES:  SYSTII"
12/76  SYSTEM

 1/77  SYSTEM

 Z/77  SYSTtM

 3/77  SYSTEM

 4/77  SYSTEM

 5/77  SYSTEM

 6/77  SYSTEM

 7/77  SYSTEM

 8/77  SYSTEM
                                                                              74*

                                                                              7*4

                                                                              672

                                                                              74*

                                                                              720

                                                                              74*

                                                                              720

                                                                              7*4

                                                                              744
       **  PROBLEMS/SOLUTIONS/COMMEN1S
              START  DATE
              END  DATE
                                               FGD  SYSTEM* GENERAL
  9/77   SYSTEM

 10/77   SYSTEM
                          8/77     t GUI I CiLNT :
                          9/77     COMM [NTS:
                          PERFORMANCE TESTS COMMENCED ON AUGUST  29,  1977  AND  WERE  SUCCESSFULLY COM-
                          PLETED ON SEPTEMBER 14, 1977.  THE TEST  PERIOD  INCLUDED  12 DAYS AT 92 MW
                          FLUE 6AS teuIvALENT AND 3.5 DAYS  AT  110  MU  FLUE  GAS EQUIVALENT.  DURING
                          TUS FERICt, MX OF THE SQ? WAS REMOVED  WKILE BURNING COAL CONTAINING 31
                          SULFUR AND 20< TONS OF ELEMENTAL  SULFUR  W^RE RFCOVER.  ALL PERFORMANCE CRI
                          TtRIA WERE CE1 INCLUDING S02 REMOVAL,  PARTICULATE  EMISSION, RAW MATERIAL
                          A*D UTILITY CCNSUMPTIONS AND RECOVERED SULFUR 8UAL1TY.  THE FGD UNIT SHUT
                          DCUN SEPTEMBER 19 AND REMAINED IDLE  THROUGH MONTH  END DUE TO COAL FEED
                          PROBLEMS RESULTING FROM WET COAL  ON  THE  UNIT 11  BOILER.
             AFFECT£D MODULtS: SYSTEM

                                                                              720
                                                                              744
       ** PROisLEMS/SOLUTIONS/COKMENTS
             START DATE  10/77     IOUIPMENT:  F6D SYSTEM,
             END DATE    10/77     COMMENTS:
                          A DEMONSTRATICN PERIOD OF ONE  YEAR  BEGAN SEPTEMBER 16.  DUR1N6 OCTOBER,  TH
                          F£D UNIT OPERATED 132 HOURS.   OPERATIONS WERE INTERUPTED WHILE HEAT PAL-
                          ACE TESTS WERE CONDUCTED ON THE  UNIT 11 BOILER  BY NIPSCO AND TRU AND WERE
                          INTERRUPTED FLRTHfcR  TO MARf;  REPAIRS TO THE S02 REDUCTION SECTION, THE EVAP
                          ORATOR, AND T ht UNIT 11 POILER.
             AFFECTED MODULES: SYSTEM
11/77  SYSTEM
                   74.0
                                            72.0
                                                        90.0
                                                                              730
                                                                                           428
       ** PR06LEKS/SOLUTIONS/COMMENTS
             START DATE  11/77     E6UIIWENT:  FGO  SYSTEM,  GENERAL
             END DATE    11/77     COMMENTS!
                          T»iE FGD UNIT  ITERATED  FOR  18  CONSECUTIVE DAYS, AVERAGING 90*  S02  REMOVAL
                          WITH ;?5 LONG TONS OF  SULFUR  RECOVERED.  FGD OPERATION WAS INTERRUPTED  BY
                          UKIT 11 BCjLEi TUBE  LEAK AND  RESUMPTION OF FGD OPERATION WAS  FURHTER  DELAY
                          EC BY MAINTENANCE IN THE EVAPORATOR  SECTION.
             AFFECTED MODULES: SYSTEM

       ** PROHLEMS/SOLUTIONS/COMWENTS
             START OATE  11/77     ECUIffENT:  6AS  DAMPER
             END DATE    11/77     COMMIT: PREVENTIVE  MAINTENANCE SCHEDULED UNIT OUTAGE
                          MAINTENANCE W />S PERFORMED  ON  THE FLUE GAS ISOLATION DAMPER.
             AFFECTED MODULES; SYSTEM
                                                2E7

-------
FP» UTILITY  FtD  SURVEY:  DECEMBER 19/F  - JANUARY
                                            SECTION 3
                     DESIGN  AND PERFOPKAhCE DATA FOR OPERATIONAL  F60 SYSTEMS
...... - ................................... PERFORMANCE DATA ---- ...... --------------------- "     ...
PERIOD MODULE  AVAILABILITY OF-ERA8IL]TY PLIABILITY UTILIZATION  I REMOVAL    PER   BOILER  FGo   CAP.
                                                                 S02   PART.  HOURS  HOURS  MOORS FACTOR


       **  PROciLEMS/SOLUTIONS/COWMENT S
              START  HATE   11/77     £»UI'«tNT: FAN
              lHt> DATE     11/77     CCPNlNT: PREVENTIVE MAINTENANCE SCHEDULED  UNIT  OUTAGE
                           MAINTENANCE W« PERFORMED ON THE  FLUE GAS BOOSTER BLOWER.
              AFFFCTED  MODUIES: SYSTEM

       **  PRObLEKS/SOLUTl ONS/COPMENTS,
              START  DATE   11/77     fc CiU I I » ENT : AUXILIARY ESU1PMENT
              tND DATE     11/77     COMMNT: PREVENTIVE MAINTENANCE SCHEDULED  UNIT  OUTAGE
                           MAINTENANCE Vtf. PERFORMED ON THE  S02 REDUCTION SECTION.
              AFFFCTED  MOMJLfs' S*STtM
 12/77   SYSTEM      49.0                      .0           .T                   768            0

        •*  PR08LEMS/SOLUTIONS/COMMENTS
              START DATE  12/77     ESUIIKENT: FAN
              END DATE    12/77     COMM('NTs PREVENTIVE MAINTENANCE  SCHEDULE;  UNIT OUTAGE
                           MAINTENANCF W ,T PERFORMED ON THE FLUE GAS BOOSTER BLOWER
              AFFECTED MODULES: SYSTEM

        *•  rROBLEMSSSOLUTlONS/COKPENTS
              START DATE  12/77     COtirCENT: AUXILIARY E8UIPKENT
              END DATE    12/77     COM IN T s P REVE NTI VE MAINTENANCE  SCHEDULED  UNIT OUTAGE
                           MAINTENANCE W)S PERFORMED ON THE ABSORBER SOLUTION  REGENERATION SECTION.
              AFFECTED MODULfS: SYSTEM

        •*  PROBLEMS/SOLUTIONS/COHMENTS
              START DATE  12/77     teUJI'ENT: FGD SYSTEM, GENERAL
              END DATE    1?/77     COMMCNTSs
                           Tht FCD SYSTSr WAS NOT OPERATED DURING  THIS  PERIOD  DUE TO ABNORMAL BOILER
                           OPERATING CONDITIONS RELATED TO HIGH  SILICA  LEVELS  IN THE FEED WATER.  THE
                           HIGH SILICA LtVELS RESULTED FROM HIGH MAKE-UP  WATER REQUIREMENTS DUE IN
                           PART TO A HIGHfR THAN NORMAL FGD PLANT  USAGE,  AS  WELL AS UNIT 11 COAL FEED
                           PRCBLfM AND A PRECIPITATION MALFUNCTION,
              AFFECTED MODULES: SYSTtK

  1/78   SYSTEM      60.0                      .0           ,n                   720            0

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   1/78     EQUIPMENT: FGD SYSTEM, GENERAL
              END DATE     1 /78     COMMITS:
                           TH£ FKD SYSTEM REMAINED DOWN THROUGHOUT  JANUARY  AS  HIGH SILICA LEVELS IN
                           TKE UNIT 11 BULER FEED WATER PERSISTED.
              AFFECTED KOOULtS: SYSTEM

        **  PROtiLEMS/SOLUTIONS/COMMENTS
              START DATE   1 /7R     t*UI'KENT: ESP
              END OATF     1/78     PROS|.FM! NOT BE FINEO/S Pf CI Fl ED
                           MAINTENANCE w*s PERFORMED ON THE UNIT  11  PRECIPITATOR.
              AFFFCTED MODULiS: SYSTif

        **  PNOULEMS/SOLUTIONS/COMMENTS
              START DATE   1/78     EOUJIMfNT: FAN
              END DATE     1/78     COMMIT! pREVENTlVi MAINTENANCE
                           MAINTENANCE UdS PERFORMED ON THE FLUE  GAS ROOSTER IUOWER.
              AFFECTED MODULESs SYSTIM

        **  PRCBLEMS/SOLUTIONS/COMMENTS
              STA^T DATE   1/7g     lOUIfttENT: AUXILIARY EQUIPMENT
              £ND DATE     1 /78     COMM^Tt pREVENTtyE MAINTENANCE
                           MAINTENANCE W/S PERFORMED ON THE FGD  SYSTEM  SO?
              AFFICTID MODULISl SVSTLP

  2/76   SYSTfM      47.0                      .0           .0                   720

        **  PROiiLiMS/SOLUTlONS/CCMMENTS
              START DATE   2/T«     E6UIFMINTI
              END DAT!     ?/78     COMMTNTSj


                                                228

-------
                                             EPA UTILITY  FGD  SURVEY: DECEMBER 1V78 - JANUARY 1979
                                            SECTION  3
                    DESIGN AND PERFORMANCE  DATA FOR OPERATIONAL  FGD SYSTEMS
	......—......—.	PERFORMANCE  DATA	......	...	
PERIOD MODULE AVAILABILITY OPERABIL1TY  PLIABILITY  UTILIZATION  X  REMOVAL   PER  60HER  FGD   CAP.
                                                                 502  PART. HOURS HOURS  HOURS FACTOR

                          THE F6D SYSTEM WAS NOT OPERATED  DUE  TO ABNORMAL BOILER OPERATING CONDITION
                          RELATED TC HIGH SILICA LEVELS  IN  THE BOILER  FEF0 WATER* COUPLED WITH UNIT
                          11 COAL FEED  PROBLEMS, STOP  VALVE  PROBLEMS,  PRECIP1TATOR MALFUNCTION AND A
                          LfcAKING BOILEK TUBE  AND  WORK ON  THE  FLUE GAS ISOLATION DAMPER.
             AFFECTED MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   2/78      tGUIFMENT:  FAN
             END DATE     2/78      COMMENT: PREVENTIVE MAINTENANCE
                          MAINTENANCE IMS PERFORMED ON THE  FLUE GAS BOOSTER BLOWER.
             AFFECTED MODULES: SYSTEM

       ** PR08LEMS/SOLUTIONS/CGMMENTS
             START DATE   2/78      t OU1""ENT:  GAS  DANPER
             END DATE     2/78      COMMfNT: PREVENTIVE MAINTENANCE
                          MAIN.TENANCF WJ5 PERFORMED ON THE  FLUE GAS ISOLATION DAMPER.
             AFFECTED MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   2/78      EQUIPMENT:  RECYCLE  PUMP
             END DATE     2/78      COMMENT: PREVENTIVE MAINTENANCE
                          MAINTENANCI W'S PERFORMED ON THE  EVAPORATOR  CIRCIRCULATIN6 PUMP.
             AFFECTED MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   2/78      tOUI^ENT:  PIPING
             END DATE     2/76      COMMIT: PREVENTIVE MAINTENANCE
                          MAINTENANCE WAS PERFORMED ON THE  S02 SUPERHEATER PIPING.
             AFFECTED MODULES: SYSTEM

  3/78  SYSTEM      90.0                     77.0        30.C                  720          215

       • * PROBLEMS/SOLUTIONS/COMKENTS
             START DATE   J/76      IOUIme«T:  FGD  S*STEM»  GENERAL
             END DATE     3/76      COKMfNTS:
                          TKF  FGD  SYSTEM OPERATED  FOR  TEN  DAYS.  OPERATION WAS INTERRUPTED BY SHUT'
                          DCWN OF  THE  UMT  11  BOILER FOR AFFAIR OF COAL GRINDING MILLS AND PRECIPITA
                          TORS.   PRCPl-R CONDITIONS COULD NOT BE R fc-ES TABl ISHED FOR RE-START OF THE
                          FGD  OPERATION BECAUSE OF COAL FEED AND GRINDING PROBLEMS CAUSED FY EXTREME
                          LY POOR  SU/lLI 1Y  COAL.
             AFFECTED MODULES: SYSTEM

       *• PSOBLIMS/SOLUT10NS/COMMENTS
              START DATE   3/78      tCIUllPlENT:  FAN
              END DATE     5/78      COMMfNT:  PREVENTIVE MA1N1FNANCF
                          MAINTENANCE  W«5  PERFORMED ON THE  BOOSTER BLOWER*
              AFFECTED WODULIS: SYSTtC!

       ** PROSLEMS/SOLUTIONS/COMMENTS
              START DATE   3/78      IGUIiKENT:  GAS  OAMPER
              END DATE     I /7B      FROFJ if: M !  NOT DE FINED/SPFCIF I ED
                          OPERATING PROBLEMS  WERE  INrOUNTgRED HjTH THE FLUE liAj ISOLATION PAMPER.
             AFFECTED MODULES: SYSTEM

  4m  SYSTEM         .0                       .0          .0                  720            C)

       ** MOBltMS/SOLUTlONS/COMMENTii
             START DATE   4/78      [OUII'IHENTl  FAN
              END DATE     4/78      COPiMiNT:  PRIVENT1VG MAINTENANCE SCHfDULED UNIT OUTA6|
                          TtlE  fLIJE  6AC  ICOSTEP RLOWtP  WAS  OUT OF SERVICi FOR THIS EMTIRi PIRIOD  FOR
                          RIBLADIN6.  TH  FGD  SYSTiM WAS 1NCPERABII.
              AFFECTED MODIILtS: SYSTEM

       ** PfiCtafMS/KOLUTIONS/COMMENTS
              (TART DATE   4/78      E Cl! JI fENTs  CAS  DAMPFR
              tND B»TF.     4/7«      FKPUMs  Kf CHANIC At-MLATF D  COMPONENT FA I LUCE
                          A  FAILURE OF  Wl  FLUF 6A5 ISOLATION DAMPtR OCCURRED.

-------
    UTILITY FfcD SURVEY:  DECEMBER 1<»7f - JANUARY  1979

                                             SECTION  3
                     DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL FGD SYSTEMS
----------------- . ------------------------ PERFORMANCF  DATA ------------- "" --------
PERIOD MODULE  AVAILABILITY CPERAdLITY  KLIAE>ILITY  UTILIZATION  * REMOVAL    PER   BPHER  "J
                                                                  SOS  PART*  HOURS HOURS  HOUR*

              AFFECTED MODULES: SYSTEM

       **  PROBLEMS /SOLUTION 5/COI«KENTS
              START  DATE   4/78     EOUIFMENT:  FGD  SYSTEM,  GENERAL
              END DATE     4/78     COMMITS:                                                .  _ .  „.
                           A NEW SUPPLY  (f HI6H  SULFUR  COAL WAS OBTAINED »N&  SUCCE SS F llLLY TESTED  ON
                           UMT 11 Pt'ILEU   THJS COAL  IS  EXPECTED TO ALLEVIATE  PAST  DIFFICULTIES
                           T>E COAL fEtD AND GRINDIN6  SYSTEM.
              AFFECTED MODULIS: EYSTE*

       »*  PRObLEWS/SOLUTIONS/COK«ENTS
              START  DATE   4/78     EGlim'ENT:  FAN
              tND DATF     */78     CCKp> (NT : ' pREVENTl V^ MAINTENANCE
                           MAINTENANCE WHS PEHFORMED ON THE BOILER I'f' FANS.
              AFFECTED MODULES! SYSTEf

       •*  PROfllEMS/SOLUTIONS/COMHENTS
              START DATE   4 /7B     lOtl rfl [NT:  AUXILIARY  EQUIPMENT
              END DATE     4 /7fc     COKMtNTS:
                           MAINTENANCE WPS PERFORMED ON THE BOILER I'D. FA*|S.
              AFFECTED MODULES: SVSTEK

       **  PROyLEMS/SOLUTIONS/COMMENTS
              START DATE   4/76     CGUIFPENT:  AOSORBER
              END DATE     4/78     COKMiNT: PREVENTIVE MAINTENANCE
                           MAINTENANCE w/is  PERFORMED ON THt FGD ABSORBER.
              AFFECTED MODULES: SYSTtl*

  5/78
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   5/78      E6UIPPENT:  FGD SYSTEM, GENERAL
              END DATE     5/78      COMMENTS:
                           TtE  SO?  RECOVIRY PORTION OF THE FSD SYSTEM OPERATED  FOR 26 DAYS.  THF  COP-
                           PLFTED  FGD  SYSTEM OPERATED FOR 11 DAYS.
              AFFECTED MODULES:  SYSTEM

        «* PRClBLEMS/EOLUTlON S/CCWWENTS
              START DATE   5/78      E6UIFHENT:  GAS DAMPER
              END DATE     5/78      F'ROB IE M : KE CHANICAL-RE L ATED  COMPONENT  FAILURE
                           FSD  OPERATION!:  WERE  INTERRUPTED PY FAILURE OF THE FLUE GAS ISOLATION  DAMP-
                           ER.
              AFFECTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   5/78      EGUI f KENT:  POI LER-RELATE D
              END DATE     5/78      COMMFNTS:
                           FCD  OPERATIONS  WERE  INTERRUPTED BY PROBLEMS  WITH WET COAL WHICH  REQUIRED
                           T*E  UNIT  11  BULER TO OPERATE ON  LOW  SULFUR  COAL FOR A SHORT PERIOD.
              AFFECTED MODULES:  SYSTEF

        ** PR06LEMS/SOLUTIONS/COMMENTS
              START DATE   5/78      efiUIIKENT:  AUXILIARY EQUIPMENT
              END DATE     5/78      PROBLEM: CHEMICAL-RELATED PLUGGING
                           FGD  OPERATIONS  WERE  INTERRUPTED BY PLUGGING  OF  AN ENTRAINKENT  SEPARATOR IN
                           THE  S02  REDUC UON UNIT.
              AFFECTED WODULfS:  SYSTEM

  6/78   SYSTEM      13.0                      1.0           .0                  7?0           ?00

        •* PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/78      E6UIFMENT:  FGD SYSTEM, GENERAL
              END DATE     6/78      C00MtNTS:
                           THE  FGD  PROCESS  FACILITIES, CONSISTING Of THE  ABSORBER, EVAPORATOR, 302 RE
                           DICTION  AND  PIPGE TREATMENT UNITS, WERE  AVAILABLE FOR OPERATION  FOR ESSEN-
                           TIALLY  THE  ENURE PERIOD.
              AFFECTED MODULES:  SY$TEf

-------
                                              EPA UTILITY  F60  SURVEY: DECEMBER 1978 - JANUARY  1979
                                            SECTION 3
                    DESIGN  AND  PERFORMA&CE OAT* FOR OPERATIONAL  FCD SYSTEMS
------------------------------------------ PERFORMANCE  DATA ------------------------------------------
PERIOD MODULE AVAILABILITY  CPEFABIL1TY (PLIABILITY UTILIZATION   X  REMOVAL   PER  BOILER  F6D    CAP.
                                                                  S02  PART. HOURS HOURS  HOURS  FACTOR


       ** PROBLEMS/SOLUTIONS/CCMMENTS
             START  DATE   6/78      E8UIFMENT: FAN
             END DATE     6/78      FfOBtFM: MECHANICAL-RELATED  COMPONENT FAILURE
                          OPERATION OF 1*6 FGD SYSTEM  WAS  LIMITED  BY FAILURE OF THE ROOSTER BLOWER
                          CR1VF TUREINE .
             AFFECTED  MODULES:  SYSTEM

       ** PROBLEMS/SOLUTIQNE/CCMMENTS
             START  DATE   tilt      ECUIFNENT: GAS  CAMPER
             END DATE     (jilt      F'POBUM: MECHANICAL-RELATED  COMPONENT FAILURE
                          OPERATION OF IHE F6D SYSTEM  WAS  LIMITED  DUE , IN PART, TO THE INABILITY OF
                          TfE ISOLATION bAMPER TO  OPERATE
             AFFECTED  MODULES:  SYSTEM

  7/78  SYSTEM        6.0                      « .0         ?.0                   720          170

       ** PR06LEMS/SOLUTIONS/COMMENTS
             START  DATE    7/76      SOUI FM6NT: FAN
             END DATE      7/7*      PSPEUIM: MECHANIC* L-HELATEB  COMPONENT FAILURE
                           OPERATION OF THE FED SYSTEM  WAS  LIMITED  iY IMBALANCE OF THE BOOSTER  BLOWER
                           OLE TO INABILITY OF THE  ISOLATION  DAMPER TO OPERATE, THIS CONDITION  COULD
                           NCT E>£ COmC If D UNTIL POWER DEMANDS  PERMITTED A SHUT DOWN OF UNIT  11 BOIL
                           IK.  FLUE tAf MOOSTER BLPWER PROBLEMS INCLUDED LOW OIL PRESSURE, LEAKIN6
                           BEARtNO OIL  SMLS AND DRIVE  TURBINE  GOVERNOR MALFUNCTION.
             AFFECTED  MODULES:
        **  PR081EMS/SOLUTIONS/COMMENTS
              START DATE   7/78     EOUIFMENT:  6AS  DAMPER
              END DATE     7/78     FROEUFM: MECHANICAL-RELATED COMPONENT FAILURE
                           1H ISOLATION DAMPED  WAS  INOPERABLE OVER THE PERIOD.
              AFFECTED MODULES: SYSTEM

        **  PKOBLEWS/SOLUTIONS/COMMENTS
              START DATE   7/78     EOUIfMENT:  BOILER-RELATED
              tNO DATE     7/78 .
                           RECURRING FLUCTUATIONS  IN THE PRFSSURE OF THE MAIN STEAM  SUPPLY  TO  THE  FGD
                           SYSTEM LIMITED  FGD  OPERATIONS.
              AFFECTED MODULES: SYSTEM
        **
              START DATE   7/78     EOUUfENT:  p6D  SYSTEM,  GENERAL
              END DATE     7/7p     COMMINTS:
                           THE FGC PROCESS  FACILITIES WERE  AVAILABLE FOR OPERATION  FOR  THE  INTIRE
                           PtRIOD.
              AFFECTED MODULES: SYSTEM

  8/78   SYSTEM      98.0                     98 . 0        98.0                   720           707

        ** PROfiLEKS/SOCUTlON J/COMMENTS
              START DATE   S/7fi     t«UjWEKT!  FGD  SYSTEM'  GENERAL
              END DATE     fi/78     CCMMINTS:
                           THE UMT 11 BULIR  OPERATED CONTINUOUSLY ON HICH SULFUR  CO»L THROUGHOUT TH
                           PiRIOD.  THE  F(;D SYSTEM  ACHIEVED FULL OPERATION ON  THE  FIRST DAY  OF  THE
                           PIRIOD.  AFTE*  PROtiLEMS  WITH THE BOOSTER BLOWER WE R E  CORR ECTE D,  IT RFMAINE
                           IN FULL OfERAlION FOR THE BALANCE OF THE PERIOD WITH  THE  EXCEPTION OF  ONE
                           TkO-HOUR INTERRUPTION DUE TO AN  ELECTRICAL MOTOR MALFUNCTION.
              AFFECTED MODULES." SYSTEM

        •« PROeLIMS/SOLUTJONS/COMMENTS
              START BATE   F./78     tCUirMENT:  FAN
              END DATE     K/?£     PPOB IFM t MECHANIC AL-HF LATfC COMPONENT  FAILURE
                           MINOR DOOSTIR i'LOWER  PROBLEMS OCCURRED OVER THF PERIOD.
              AFFECTED MODULES! SYSTEM

  9/7*   8YSTSM      44.0                     99.0        44. P                   720           319

-------
EPA UTILITY  FGD  SURVEY; DECIMBFR 19?f  -  JANUARY 1979
                                             SECTION 3
                     DESI6N AN'D PERFORMANCE  OAT*  FOR OPERATIONAL  FGD  SYSTEMS
---------- _ ..... ----------- ....... -------- PERFORMANCE DATA -------------------------------
Pi.ZOD MODULE  AVAILABILITY OPE.MILITt  PLIABILITY  UTILIZATION  I-WOV      >«  •««"  HJ«,
        **  PROBLEKS/SOLUTIONS/COMMENT?
              STAPT DATE   9/7R     tOUIICENT:  f6D  SYSTEM. GENERAL
              END DATf     9/78     CCMMINTS:
                           THE UMT 11  BULER  OPERATED ON HT6H SULFUR  COAL  UNTIL SEPTEMBER  12 WHEN IT
                           WAS SHUT DOWN  FOR AN  ANNUAL OVERHAUL.  THE  BOILER REMAINED OOWN  THROUGH TH
                           r*D OF THfc PEflOD.   THE  FGD SYSTEM CONTINUED  IN  FULL OPERATION UNTIL SfP-
                           TEMPER 1?. k!1H  THE  EXCEPTION Of ONE TWO-HOUR  INTERRUPTION DUE TO  A  GOVER-
                           NCR PALFUNCTKN  ON  THE  S02 COMPRESSOR DRIVF TURBINE, AND HAS THEN  SHUT DCH
                           CONCURRENTLY  '.! TH THE UNIT 11 BOILFR.
              AFFFCTEO MOr>ULiS: SYSTEM

        •*  PRODLEMS/SOLUTJONS/CCMPIENTS
              START DATE   9/7S     E6UIFMENT:  AUXILIARY EQUIPMENT
              END DATE     0/78     PROB |.h M : M E CHA NI C A L-RE L ATED COMPONENT  FAILURE
                           A GOVERNOR MALFUNCTION  OCCURRED ON THE S02  COMPRESSOR BRIyE TURBINE  CAUS-
                           IhG A TWO-HOUf. OUTA6E ON THE FCiD OPERATIONS.
              AFFl CTED MODUl II: SYSTt«

 10/7"   SYSTEM      44.0                     73.0        44.0                   8*0           369

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  10/76     tCUl'fENT:  F6D  SYSTEM. GENER/ll.
              END DATF    10/7t     COMMFNTS:
                           THIS PERIOD  CrVEFiS  SEPTEMBFR 29 THROUGH NOVEMBER 2.  FOLLOWING THE AMNUfl
                           TURNAROUND,  TK  UNIT  11  FrOILER RESTARTED ON OCTOBER 6.  A NEW BASELINE TES
                           WAS RUN ON THl BOILER OCTOBER 1 THROUGH 12.   BALANCING OF THE FLUE CAS
                           C-COST6R PLCUEO WAS  THEN  COMPLETED AFTER WHICH  THE FGD SYSTEM WAS  STARTED 0
                           OCTOPE8 1fe.
              AFFECTED MODULES: SYSTt*

 11 /7D   SVSTEM      99.0                     99.0        98.0                   720           709

        **  PROBLEMS/SOLUTIONS/COMMENTS
              STAPT DATE  11/78     ECUJtKENT:  AUXILIARY FOU1PBENT
              END DATE    11/78     PROB IE M : M f. CHAN 1C A L-RE L A TE D COMPONENT  FAILURE
                           PCRBLFMS kERF  ENCOUNTERED  WITH THE SODIUM SULFATE PURGE DRYER WHICH  NECES-
                           SITATED DISPOSING OF  PART  OF THE SULFATE PURGE  TO THE BOTTOM ASH  POND FOR
                           A PORTION Of  1ME  PERIOD.
              AFFECTED MODULES: SYSTEM

        **  PROBLEKS/SOLUT10NS/COMMEN1S
              STAf!T OAfE  11/7R     fSUIFWENT:  FGD  SYSTEM, EKNERAL
              END DATE    11/7B     COfiBtNTS:
                           TXE UNIT 11  BUIER  OPERATEft CONTINUOUSLY ON HIGH sULFuff COAL ExCFPT  FOR ON
                           THREE-HOUR OU1H6E FOR REPAIR OF A STEAK CONTROL  VALVE.  VARIATIONS IN THE
                           PRESSURE OF  T*f  STEAM SUPPLY TO F6D OCCURRED  DUE TO HIGH SILICA  IN THE
                           MAKE-UP WATER  ON  UNIT 11.
              AFFECTED MODULES:
12/78   SYSTEM      64.0                     7?.Q        6*.0                   7ZQ           ««

        **  PROBLEMS/SOLUTJONS/COMWENTS
              START DATE  12/78     ICUUMENT:  FJOI LER-RFLATE 0
              END DATE    12/78     PROPIRM: NOT OE FINED/SPF CI F IED
                           THE BOILF-R KAT  SHUT  DOWN FROM DEC. «14  TO  DEC.  17 TO CLEAN  THE  AIR
                           PREHEATERS.
              AFffCTED MODULES: SYSTEM

        **  PRObLEMS/SOLUTIONS/COMMENTS
              START DATE  12/78     EOUIFKENT:  BOI LFft-RELATF D
              END DATF    1?/78     COMMENTS:
                           TkE FOILER OPERATED  ON HIGH SULFUR COAL.
              AFFECTED MODULES: SYSTtM

        «*  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE  12/78     ECUIP"«ENT:  AUXILIARY EOUIPMENT
              END DATE    12/78     PROB^r,: WEATHER-RELATED COMPONENT  FAILURE
                                                 232

-------
                                                EPA UTILITY  F6B SURVEY: DECEMBER 1978 - JANUARY 1979
                                              SECTION 3
                     DESIGN  AND  PERFORMANCE  BAT* FOR OPERATIONAL FGD SYSTEMS
	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY  OPERABIL1TY  PLIABILITY UTILIZATION  X REMOVAL    PER  BOILER   FGD   CAP.
                                                                    502  PART.  HOURS HOURS   HOURS FACTOR

                           Afc INSTRUMINT KALfUNCTjON DUE TO  FREEZING RESULTED IN THF PLUGGING OF A
                           HEAT EXCHANGES  IN THE S02 REGENERATION UNIT.  TH£ FGD SYSTEM WAS  DOWN FOR
                           ThREE DAYS WHILE  THE EXCHANGER  WAS CLEANED.
              AFFECTED MODULES; SYSTEM

       **  PR08LEMS/SOLUTIONS/COMWEN1S
              START DATE   12/78     tOUHMENT:  FGD SYSTEM,  GENERAL
              END DATE     12/78     PROBLflir NOT DEFINED/SPECIFIED
                           THE FCD SYSTEh  WAS  SHUT DOWN  FOR  THREE DAYS  FflR  CLEANING A HEAT  EXCHANGER
                            IN THE SO? REtFNERATION UNIT.
              AFFECTED MODULES: SYSTEM

  1/79   SYSTEM      36.0                      2£ .0         2E .0                   7<4           T«B

        **  PROBLEMSASOLUTIONS/CCKHENTS                                                                   I
              START DATE    1/79     E'QUII-KENTr  BOILFR-RELATE D
              END DATE      1/79     COMM ENTS:
                            THE FC3LEK OPtFATEC  ON HIGH SULFUR COAL FROM  JANUARY i-H AND  LOU SULFUR
                            COAL JANUARY  15-11.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUT10NS/COMKENTS
              START DATE    1/79     [euiH'ENT:  FGD SYSTEM,  GENERAL
              END DATE      1/79     CO*M SNTS:
                            IKTKiRATED OPiRATlON OF THE FGD  SYSTEM CONTINUFD  TO JANUARY 10 WHEN THE
                            SO? REDUCTION  UNIT  kAS SHUT DOWN  FOR REPAIR  OF  A  SULFUR CONDENSER INCLUDIN
                            CCfiRFCTlVf MEASURES  TO AVOID  FUTURE PROBLEMS  WITH THE CONDF.NSER.   THE
                            AESORPTJOM ANt REGENERATION UNITS CONTINUED  IN  OPERATION TO JANUARY 29
                            WITH RECYCLE  t.F EOZ  TO THE  ABSORBER INLET.   THf  FGD SYSTEM REMAINED DOWN
                            THROUGH JANUARY 31.
              AFFECTED MODULES: SYSTEM

-------
FPA UTILITY  F6D  SURVEY; DECEP6ER  197f  -  JANUARY 1979
                                             StCTION 3
                     DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL  FGD SYSTEMS
 COMPANY  NAPE
 PLANT  NAHF
 UNIT  NUMEIEK
 CITY
 STAT E
 REGULATORY  CLASSIFICATION
 P'RTICULATE EMISSION LIMITATION  -  Ki/J
 SP2  EMISSION  LIMITATION  -  SG/J
 NfT  PLANT ttNERATlNG CAPACITY  -  MW
 GROSS  UNIT  GENERATING  CAPACITY  - Mb
 NfT  UNIT GENERATING CAPACITY  W/FGD - MV
 NET  UNIT CiEKtRATlN6 CAPACITY  WO/FGt  - fW
 EOUIVALENT  SCRUfBED CAPACITY  -  KW

 ** P.OILFR DATA
      SUPPL1 tR
      TYPF
      SERVICE LOAD
      COMMERCIAL SERVICE  DATl
      MAXIMUM tlOHER  CLUE  CA I  FLOW - CU."/S'
      FLUE GAS  TIMPERATUKt  -  C
      STACK HE I6HT  -  M
      STACK TOP DIAFtTER  -  M

  ** FUEL DATA
      FUEL TYPE
      FUEL 6RAOE
      AVEFACE HEAT  CONTENT  -  KJ/KG
      RANPE HfAT CONTENT  -  MU/lfc
      AVERAGE A$H  CONTENT  - i
      RANT,£ ASH CONTENT  -  X
      AVERAGE MOISTURE CONTENT  - %
      RANGE MOISTURE  CONTENT  -  X
      AVERAGE SULFUR  CONTENT  -  9!
      RANCE  SULFUR  CONTENT  - *
      AVERAGE CHLORIDE COHTEM  - %
      RANGE  CHLORIDE  CONTENT  -  >
      FUEL F IRIN6  RATE - fl  T /H
      FUEL F IRING  RATF - HW

  ** PARTICULAR SCRUORER
      TYPE
      SUPPLIER
      NUMPER  OF  STACEE
      SHELL MATERIAL
      INTERNAL MATERIAL
      NUMBER  OF  NOZZLES
      TYPE OF NOZZLES
      BOILER  LOAD/SCRUBBER - X
      FLUf 6AS CAPACITY - CU.W/E
      FLUE GAS TEMPERATURE - C
      LIGUID  fcEClRCULATION RATE - LITER/J
      L/6 RATIO  - LITER/CU.M
      PRESSURE DROP  - KPA
      SUPERFICIAL 6As VELOCITY - M/S

  ** F60 SYSTEM
      SALEABLt PRODUCT/THROWAWAY PROCUCT
      GENERAL PROCESS TYPE
      PROCESS TYPE
      SYSTEM  SUPPLIER
      A-E FIRM
      OEVELOPNENT LEVEL
      NEW/RETROFIT
      PARTICIPATE DESIGN REKCVAL EFFIC1E^CY
      So2 DESIGN  REMOVAL EFFICIENCY - J
      COMMERCIAL  pATg
      INITIAL START-UP

  *• ABSORBER
                   .0?.7 LR/MMBTU)
                   .960 tn/MMBTU)
NORTHERN  STATES  POWER
SHERFUPNC
1
BECKER
MINNESOTA
B
   37.          <
  417.          <
 3?00.0
  720.C
  68H.O
  70n.O
  7ZC.O
COMBUSTION  ENGINEERING
PULVERIZED  COAlf  BALANCER DRAFT
BASE
 0/7A
 13*0.16        
******          <»*** FT)
*******         (****«  FT)
COAL
SURBITUMINOUS
 19771.

    9.00
******
   ?5.00
******
      .80
******
********
******
  369.1
                (  £500
                 ******
                (407 TPM)
      TYPF
      INITIAL START  UP
      SUPPLI ER
      NUMRER OF  STAGES
12
RECTANGULAR VARIABLE THROAT  ROD  DECK VENTURI
COMBUSTION  ENGINEERING
     2
CARBON  STEEL JNLET, SUL. ss  SKIRT.  316L VENTURI
3UL SS RODS
    26
CERAMIC
     9.0
   12E.6        ( 259900 ACFM)
   154.4        (  310 F)
   J2T..O        ( 3540 GPM)
     1.9        414.0 6AL/1000ACF)
     3.7        C   15 1N-H20)
    24.4        (   80.0 FT/S)
THROWAWAY  PRODUCT
WET  SCRUBBING
LIMESTONE/ALKALINE FLYASH
COMBUSTION ENGINEERING
BLACK  AND  VEATCH
FULL-SCALE
NEW
   99.00
   50.00
  3/76
  3/76
 12
 MARBLE BED
  3/76
 COMBUSTION ENGINEERING
     1
                                                  234

-------
                                            EPA UTILITY FED SURVEY: DEcfHBE*  1978  -  JANUARY
                                          SECTION 3
                   DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL F6D SYSTEMS
   DIMENSIONS
   SHELL MATERIAL
   SHELL LINER HATEftlAL
   INTERNAL MATERIAL
   NUMBER of NOZZLES
   N02ZLE TYPE
   BOILER LOAD/ABSORBER  - X
   6AS  FLOW - CU.N/S
   6AS  TEMPERATURE  -  C
   L16U1D RECIRCULATION  RATE - LITEfi/S
   L/6  RATIO  . L/CU.H
   PRESSURE DROP  -  KPA
   SUPERFICAL 6As VELOCITY - M/SEC
   PARTKULATE INLET  LOAD - G/CU.H
   PARTICULATE OUTLET  LOAD- G/CU.f:
   PARTICULATE REMOVAL  EFFICIENCY - *
   S02  INltT  CONCENTRATION - PPM
    S02  OUTLET  CONTRAT10N - PPK
   S02  DESIGN  REMOVAL  EFFICIENCY - X
18X26.5
CARBON STEFL <1'4  IN)
CEILCOTt FLAKE  FIBERGLASS
316LSS PERFORATED  PLATE,  FRP  SPRAY  HEADERS
   54
CERAMIC
    9.0
                 200000 ACFft)
                   130  F>
                 1900  GPfiJ
                   9.5  GAL/1000ACF)
                 2.0  IN-H20)
                 31.0  FT/S)
                ( 3.000 6R/SCF)
                (   .0?6 Gft/SCF)
 94.38
 54.4
120.
  1.3
   .5
  9.4
  6.9
   .1
 99.0
TOO
325
 55.0
** HIST ELIMINATOR
    MUMPER
    TYPE
    CONSTRUCTION CATER UL
    CONFI6URATION
    NUMBER OF STAGES
    NUMBER OF PASSES
    FREEBOARD DISTANCE - »
    VANE SPACING - CM
    WASH SYSTEM
    SUPERFICIAL GAS VELOCITY - PI/S
    PRESSURf DROP - KPA

** PROCESS CONTROL CHEMISTRY
    CONTROL VARIABLES
    CONTROL RANGE
    CONTROL MANNER
    MODE

** PUMPS
    SERVICE
    POND RETURN
    THICKENER UKDFKFLOU
    MAKEUP WATER
    ******
    RECYCLE
    SPRAY

 ** TANKS
    SERVICE
    REACTION
    MAKEUP WATER
    SLURRY KAKEUP

 ** REHEATER
    MUMPER
    HEATING MEDIUM
    TEMPERATURE BOOST
    ENER6Y REQUIRED

 ** THICKENER
    NUMPER
    TYPE
    DIAMETER - M
    OUTLET SOLIDS -  if

 ** WATER LOOP
    TYPr
12
CHEVRON
FRP
HORIZONTAL
     ?
     6
     7.20        (10.5  FT)
   10.2         <  4.00  IN)
INTERMITTENT UPWARD WASH  ROTATABLE,  120-150 PSI6
     9.4         <  31.0  FT/SJ
      .0         (   .0  IN-H20)
SLURRY  PH,  SLURRY  SOLIDS,  TANK  LEVELS,  PRESSURE
PRESSURE  DROP  12  IN  H20,  10X  SOLIDS, PH=5-5!5
AUTOMATIC
FEEDBACK
    1
    1
    1
    2
    Z
   12
 NUMBER

    1
    1
    1
 11
 IN-LINE
 280  F  HOT  WATER
    2?.2         <
 132  «H BTU/H
                  4C  F)
 CENTER RAKF DRIVE
    4*.B        (160 FT)
                                                OPEN
                                               235

-------
F PA UTILITY  fbD  SURVEY: DECffFR ^t>7f  - JANUARY  1979
                                             SECTION 3
                     DlSldN AND Pf RFORMKCE  DATA  FOR OPERATIONAL F€D  SKSTFflS
 ** REAGENT  PREPARATION EQU1PPFNT
      NUNF-ER  OF  bALL "ILLS
      BALL  MILL  CAPACITY- M T/H
      REAGENT PROPUCT - 1 SLLRRY SOLUi

 ** TREATMENT
      TYPF
      SUPPLI ER

 •* DISPOSAL
      NATURF
      TYpr
      LOCATI ON
      TRANSPORTATION
      AREA  -  ACRES
      CAPACITY  - CU.M
                      1
                    21.6
                   60.0
(  24.C TpH)
                 FORCIBLY  OXIDIZED
                 NONPPOPR1ETARY
                 FINAL
                 LINED  POND
                 ON-SITF
                 PIPE
                   500.0
                   30575000
(  25000.0 ACRE-FT)
 	PERFORMANCE. DATA	
 PERIOD  MODULE AVAILABILITY CPERARILITY  HLIAHILITY UTILIZATION  2 REMOVAL    PER  BOILER  FSD    CAP.
                                                                  SO?   PART.  HOURS HOURS  HOURS  FACTOR
  4/76   SYSTEM
                                                                                720
        ** PROBLEMS/SOLUTIONS/COKMENTS
              START DATE   4/76      IOU J 111'ENT:  FGO  S»STEM» 6ENERAL
              END DATE     4/76      COKBfNTS:
                           A  PRELIMINARY  SYSTEM CHECKOUT WAS SUCCESFULLY  COMPLETED BY PASS1N6  AIR  AND
                           WATER  THROUGH  THE  SYSTEM.
              AFFECTtD MODULES:  SYSTEM
  5/76
         102
         10?
         104
         105
         106
         107
         10?
         109
         110
         111
         112
        SYSTEM
                    te.o
S J.C
81.0
59.0
7?.C
90.0
57.0
69.0
60.0
75. 0
72.0
67.0
                                                                                7<«   657
                                                                  60.0
        ** PROBIEMS/SOLUTIONE/COMMENTS
              START BATE   5/76      EBUIfMENT:  SPRAY NOZZLES
              tND DATE     6/76      PfiOPlEM: NOT DEFINED/SPECIFIED
                           MCDIFICAT10NS  ARF CONTINUING ON THE  SPRAY  SYSTEM. SPRAY NOZZLES  AND
                           STRAINER  SYSTf*.
              AFFECTED MODOLIS:  SYSTEM

        *« PROBLEMS/SOLUTIONS/COKMENTE
              START DATE   5/76      E6UI f'Pi ENT:  FGD SYSTEM, GENERAL
              END DATE     5/76      COMMENTS:
                           FIRST  COMMERCIAL  OPERATION COMMENCED  MAY  1,  1976.  THIS IS  AN  INTERMEDIATE
                           LCAD  UNIT  OPEK'TING  NEAR FULL CAPACITY  DURING THE DAY AND 35  PERCENT
                           CAPACITY  AT  N16HT.
              AFFECTED MODULES:  SYSTEM
  6/76   SYSTEM
                    84.0
                                                                                720    688
                                                                  73.0
  7/76
        101
         TO?
         103
         104
         105
         106
         107
         10?
80.0
6^.o
71.0
E1.0
£0.0
6P.O
81.0
75.0
                                                 236

-------
                                              EPA UTILITY fGD SURVEY: DECEMBER  1978  - JANUARY 1079
                                            SECTION  3
                    DESIGN  AND PF. RFORMA hCE CATA  FOR OPERATIONAL FCC SYSTEMS
...	.	...	...—.—	......PER f ORMANCE  DATA	
PERIOD MODULE AVAILABILITY OPERABIL1TY  RELIABILITY  UTILIZATION
                                              X  REMOVAL    PER  BOILER  FGD    CAP.
                                              SOZ   PART.  HOURS HOURS  HOURS  FACTOR
109
110
111
11Z
SYSTEM 84.0
79.0
63.0
91.0
69. C





744 512 51.0
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    7/76     EGUIFfENT:  SPRAY NOZZLES
              END DATE     8/76     PROBIEM:  CHEMICAL-RELATEC PLUGGING
                           THE SLURRY N07ZLKS ARE  FREOUENTLY PLUGGED BY PARTICLES  ABOVE QUARTER INCH
                           SIZE. STRAINER  NOD IFICATIONS ARE PLANNED TO ALLEVIATE  THIS  PROBLEM.
              AFFECTED MODULES: SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    7/76     EQU1FMENT:  ABSORBER
              END DATE     R/76     PPOPtrM:  CHEMICAL-RELATED SCALING
                           HARD SCALE GYFSUM  FORMATION ON THE VESSEL WALLS  HAS  LEVELED  OFF-  THE
                           CLEANING FPOCrSURE CALLS  FOR 3-4 MODULES TO BE  TAKEN OUT  OF  SERVICE EACH
                           NIGHT.  THUS, EACH MODULE IS CLEANED ONCE EVERY  3  DAYS.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   7/76     EQUIPMENT:  FGD  SYSTEM, GENERAL
              END DATE     8/76     COMM fNTS:
                           A  CRFW  OF  70  FFOPLE  IS  REQUIRED TC MAINTAIN SCRUBBER OPERATIONS.
              AFFECTED MODULES: SYSTEM

        **  PR08LEMS/SOLUT10NS/COMMENTS
              START  DATE   7/76     EGUIfMENT:  RECYCLE TANK
              END DATE     8/76     PROPtEM:  CHEMICAL-RELATED SCALING
                           THE DEPOSITION  OF  SOFT  SOLIDS IS STILL  CONTINUING  IN THE  REHEATERS.
              AFFECTED MODULES: SYSTEM

        **  PRC6LEMS/SOLUT10NS/COKWENTS
              START  DAyE   7/76     ESUIfKENT:  MIST ELIMINATOR
              END DATE     8/76     PROBLEM: CHEMICAL-RELATED SCALING
                           TliE DEPOSITIOK  OF  SOFT SOLIOS IS STILL  CONTINUING  IN jU E  MIST ELIMINATORS.
              AFFECTED MODULES: SYSTtl*
  «/76  101
         102
         103
         104
         105
         106
         107
         108
         109
         110
         111
         112
        SYSTEM

  9/76  101
         102
         105
         106
         107
         108
         109
         110
         111
         112
        SYSTEM
94.0
            46.0
            93.0
            51.0
            84.0
            83.0
            76.0
            71.0
            84.0
            81.0
            76.0
            67.0
            91.0
            90.0
            93.0
            76.0
            76.0
            79.0
            65.0
            79.0
            65.0
            80.0
            92.0
            96.0
                                                            744    705
                                                                              80.0
                     95.0
                                                            720   566
                                                                              68.0
                                                  237

-------
EPA UTILITY  F6D SURVEY:  DECICBFR 197f - JANUARY 1979
                                            SECTION 3
                     DESIGN AND PERFCD*AKCI DATA FOP OPERATIONAL F6D SYSTfMS
	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY  CPEKABILITY FFLIABILITY UTILIZATION  r REMOVAL    PER   BOHER  FGD   CAP.
                                                                 S02  PART.  HOURS  HOURS  HOURS FACTOR
        • «  PROHLEMS/SOLUTJONS/COCiMENIf
              START  DATE    9/76     l«UIf*ENT:  SPRAY NOZZLES
              END  DATE     1C/76     PROPlFM: NOT D E F I N ED /S PF. CI F I ED
                           THF STRAINFR SYSTEM  IS BEING MODIFIED.  THF. DUPLEX  UNITS  ARE TO BE
                           REPLACED  bY Ih-TANK  SCREENS AND WASH LANCES.   BOTH  ARE LOCATES AT THE
                           SICTION Sltt tMEN7J
              START  DATE    9/76     E6Ull-^ENT:  REHEATF.R
              END  DMF     1C/76     PROPUMr «I CHA NIC AL-REL ATE D COMPONENT FAILURE
                           CARBON STEEL (IN TUBF REHEAT BUNDLES ARE AN AREA OF  CONCERN.  KOLTIPLE
                           FAILURES  IN FCUR UNITS HAVE REEN EXPERIENCED.
              AFFECTED  MODULES; SYSTEM
 10/76
 11/76
101
 102
 10?
 104
 105
 106
 107
 108
 109
 110
 111
 112
SYSTEM

101
 10J
 10?
 104
 105
 106
 107
 10?
 10
-------
                                            EPA UTILITY FGD SURVEY:  DECEMBER  1978 - JANUARY 1979
                                          SECTION 3
                   DESIGN  AND  PERFORMAKE DATA FOR OPERATIONAL  F6D  SYSTEMS
PERIOD

MODULE AVAILABILITY
108
109
110
111
112
SYSTEM 95.0
OPERABU1TY RELIABILITY UTILIZATION
95.0
94.0
88. D
7J.O
75.0
X REMOVAL PER
S02 PART. HOURS
744
BOILER F6D
HOURS HOURS
722
CAP.
FACTOR
91.0
      **  PROBLEMS/SOLUTIONS/COKMENTS
            START CATE  12/76     EQUIPMENT:  F6D  SYSTEM.  GENERAL
            END DATt    12/76     COMHlNTSs
                         TtE UTILITY IS NOW CONDUCTING  A  FILL-LOAD EVALUATION STUDY. ANALYZING
                         SYSTEM OPERATION ON  10 NODULES  VS.  THE DES IGNF.D 11  MODULES.
            AFFECTED MODULES: SYSTEM
1/77  101
       102
       103
       104
       105
       106
       107
       108
       109
       110
       111
       112
      SYSTEM

2/77  101
       102
       IDS
       104
       105
       106
       107
       108
       109
       110
       111
       112
      SYSTEM
91.0
3/77
       101
       102
       103
       104
       105
       106
       107
       108
       109
       110
       111
       112
       SYSTEM
            94.0
            75.0
            99.0
            76.0
            96.0
            77.0
            70.0
            92.0
            £1.0
            40.0
            75.0
            95.0
            89.0
            99.0
            64 '.0
            96.0
            £4.0
            99.0
            81.0
            6Z. C
            98.0
            93.0
            98.0
            61.0
            47.0
            92. (l
            95.0
            93.0
            93.0
            95.0
            88.0
            93.0
            95.0
            83.C
            78.0
            72.0
                                                          744   607
73. C
                                                           672
                                                                 609
£3.0
95.0
                                                           744   7*3
                                                                             97.0
       ** PROBLEMS/SOLUTIONS/COMHENTS
             START  OATf    3/77      ESUlfMENT: SPRAY NOZZLES
             END  DATE      3/77      PROBLEM: NOT DEFINED/SPECIFIED
                          ALL  CODULtS AFC  NOy FITTED WITH IN-TANK STRAINERS.
             AFFECTED  MODULES-  SYSTEM
 4/77
       101
        102
        103
        104
            V4.0
            65.0
            92.C
            95.0
                                               239

-------
EPA UTILITY  F6D  SUPVFY: DECtNBFR 1
-------
                                              EPA UTILITY F60 SURVEY: DECEMBER  1978  -  JANUARY 1979
                    DESIGN  AND PERFORMAKI DATA FOR  OPERATIONAL FGD SYSTEMS
	PERFORMANCE  6 AT A	
PERIOD MODULE AVAILABILITY OPERAPU1TY  RELIABILITY  UTILIZATION  X REMOVAL   PER  BOILER   FGD   CAP-
                                                                  SO?  PART. HOURS HOURS   HOURS  FACTOR

                           WHILE THE UNIT WAS OUT  jN JUNE THE FGD SYSTEM «AS CLEANED.  THIS  CLEANING
                           WAS CREDITED  FOR ONE  OF  THE  HIGHEST A VA ILApILIT IES  EVER  DEMONSTRATED ON
                           THIS UNIT,
              AFFECTED  MODULES: SYSTEf
 8/77
       101
        10?
        103
        104
        105
        106
        107
        108
        109
        110
        111
        112
        SYSTEM
            85.0
            89.C
            66.0
            55.0
            81.0
            90.0
            83.0
            79.0
            72.0
            85.0
            90.0
            66.0
95.0
                                                            744
640
                                                                              68.0
        **  PROBLEMS/SOLUT10NS/COMMENTS
              START DATE   8/77      E6U1FWENT:  ABSORBER
              END DATE     9/77      PROBIEM: NOT DEFINED/SPECIFI ED
                           SCNE  ANGLES  WS-RE  INSTALLED ON THE PRIMARY CONTACTOR  RODS  TO  RESIST EROS10M
              AFFECTED MODULES:  SYSTEM
  9/77
        101
         102
         10?
         104
         105
         106
         107
         108
         109
         110
         111
         112
        SYSTEM
            86.0
            85.0
            88.0
            92.0
            £8.0
            6?.0
            63.0
            90.0
            86.0
            77.0
            77.0
            £7.0
95.0
                                                                              81.0
        ** PROBLEMS/SOLUTIONS/COKWENTS
              START DATE    9/77      tGUIfENT: PUMP, OTHER
              END DATE     10/77      PRCEIEM: NOT DEFINED/SPECIFIED
                            TWENTY-FOUR PI^PS ARE BEING COMPLETELY  OVERHAULED.
              AFFECTED MODULES:  SYSTfK

        ** PROBLEKS/SOLUT10NS/CC««ENTS
              STAftT DATE    9/77      ESUIfMENT: PUKP, OTHEfe
              END DATE      9/77      PROBltM: MATERIALS FAILUKE,OTHER
                            KCDULE  10t SPRftY WATER PUMP WAS  OVER  HAULED  IN SEPTEMBER.
              AFFECTED MODULES:  106
 10/77
        101
         102
         103
         104
         105
         106
         107
         108
         109
         110
         111
         112
        SYSTEC.
                    68.0
             70.0
             81.0
             55.0
             97.0
             63.9
             35.0
             P7.0
             99.0
             96.0
             J9.0
             5P.C
             96.0
                                                            744
                                                                  609
                                                                              68. C
        ** PROBLEKS/SOLUTIONS/COCmENlS
              START  DATE   10/77     ECUHfENT: SPRAY NOZZLES
              END DATE     11>77     FROBLFM: NOT DEFIMED/SPECIFI ED
                                                 241

-------
FP» UTILITY  F6D  SURWCY: DtttHBEP 197f - JANUARY  1 979
                                            SECTION  3
                     DESIGN AND PF R f Of-fl A ht E DATA FOR OPERATIONAL  FGo SYSTFMS
	...	.	__	-PERFORMANCE DATA	-•—------
PERIOD  NODULE  AVAILABILITY CAPABILITY SUABILITY UTILISATION   X  REMOVAL    PER  BOILER  FGD    CAP.
                                                                  502   PART.  HOURS HOURS  HOURS  FACTOR

                           STKAINfR/kA&Hif SCREEN EPOSION H*S BEEN  A  PROBLEM.   REPAIR AND RFPLACEMENT
                           HAS fiEEN CONTINUALLY NECESSARY.   216  SS  MATERIAL  WILL BE  USED IN THE
                           FLTURt.
              AFFECTED  MODULES: SYSTtf
11/7?
  101
   102
   103
   10*
   105
   106
   107
   10P
   109
   110

   112
  SYSTEM
                    92.0
                                77.0
                                S1.0
                                77. (1
                                *2.C
                                f7.0
                                91. C
                                89.0
                                69. C
                                V?.0
                                52.0
                                                                               720    70S
                                                                                           61.C
       ** PHOBLEWS/SOLUTlONS/CO*PENTS
             START  D«TE   12/77      E6UI (•» ENT:  SPRAY  N07ZIES
             END DATE      1/76      PSOBLfM:  NOT DE FINE D/S PE CI F I ED
                           ThE  REPLACEMENT  PROGRAM  HAS  BEGUN ON DECEMBER ?1, 1977. IT  TAKES  4.TO 6
                           DAYS  FOR  kORK  ON EACH MODULE  TO  REPLACE THE STRAINER SYSTEM.
             AFFECTED MODULES:  SYSTfC
12/77
 1/78
2/7?
 101
  102
  103
  10*
  105
  106
  107
  10R
  109
  110
  111
  112
 SYSTEM

 101
  102
  103
  10<
  105
  10*
  107
  10?
  109
  110
  111
  112
 SYSTEM

 101
 102
 103
 10*
 105
 106
 107
 10S
 109
 110
 111
 112
SYSTEM
                   91.o
                   92.0
                  92.0
                                97.0
                                90.0
                                95.0
                                94.p
                                71.0
                                92.0
                                26.P
                                67.0
                                96.0
                                9C.D
                                95.C
                                90.0
                               63.0
                               66.0
                               7T.O
                               S*.0
                               84.0
                               92.0
                               64.0
                               91.0
                               en.o
                               es.o
                               93.0
                               92.0
                               89.0
                               74.0
                               85.0
                               89.0
                               es.o
                               76.0
                               £6.0
                               88.0
                               87.0
                                                                              744
                                                                                    55?
62.0
                                                                              744
                                                                                    648
                                                                                                71.0
                                                                                    636
                                                                                                77.C
                                               242

-------
                                              EPA  UTILITY 1(0 SURVEY: DECEMBER 1978 - JANUARY 1979
                                            SECTION  3
                    DESIGN AND PERFORM A KE  DATA  FOR OPERATIONAL F«D SYSTFHS
	PERFORMANCf DATA	
PERIOD MODULE AVAILABILITY  OPERABILITY  PLIABILITY  UTILIZATION
                                                               X  REMOVAL   PER  BOILER  FGD   CAP.
                                                               S02  PART. HOURS HOURS  HOURS FACTOR
       ** PROBLEMS/SOLUTIONS/COMWENTS
             START DATE    2/78      tOUllWENI;  F6D  SYSTEM, GENERAL
             tNt> DATE      3/78      COMMLNTS:
                           MODULES  WHICH ««E SHOWING AVAILABILITY OF LESS THAN 80 PERCENT, ARE
                           THOSE  IN UHICh THE STRAINER MODIFICATIONS WERE PEfifOnED.
             AFFtCTED MODULES:  101    Ul    10?    110

       »* PROBL.EMS/SOLUTIONS/COMMENTS
             START DATE    2/78      E6UIFWENT:  ABSORBER
             END DATE      2/78      FROeLrM: NOT DEFINED/SPECIF1 ED
                           A  SULK ENTRAPMENT SEPARATOR MAS INSTALLED ALON6 WITH A KOC" WASH TRAY.
             AFFECTED MODULES:  SYSTEM
  J/7S
  «/78
     101
      10Z
      103
      104
      105
      106
      107
      10S
      109
      110
      111
      112
     SYSTEM

     101
      10Z
      103
      104
      105
      106
      107
      10S
      109
      110
      111
      11?
     SYSTEM
                    92.0
                    95.0
71.0
65.0
64.0
89.0
90.0
83.0
62.0
69.0
97.0
71.0
79.0
90.0
92.0
87.0
«7.0
44.0
B1.0
65.0
91.0
86.0
9J.O
91.0
67.0
52.0
                                                                               744   676
                                                                 80.0
                                               720    713
                                                                                                 91.0
        ** PROBLE1S/SOLUTIONS/CCNMENTS
              STAST DATE   4/78     LGUIfENT:  FGD SYSTEM,  GENERAL
              END DATE     4/7E     CCKMlNTS:
                           STRAINER MODIFICATIONS WERE.  PERFORMED  OK  MODULES  104  AND  112.
              AFFECTED MODULES: 104    11?
5/78  101
       102
       103
       104
       105
       106
       107
       108
       109
       110
       111
       112
      SYSTEM
  6/7*
         102
         103
         104
                                61.0
                                £6.0
                                85.0
                                £.6.0
                                89.0
                                64.0
                                62.0
                                8J.O
                                82.0
                                71.0
                                67.0
                                79.0
                              50.r
                              F4.0
                              P5.0
                              J5.C
                                                                               744   635
                                                                                                 72. 0
                                                 243

-------
FPA UTILITY  FGD SURVM: DECEMBER  I97f  - JANUARY  1979
                                             SCCTION  3
                     CtSlth  AND  PERFOPKAhCE DATA  FOR OPFRATJONAL FCD  SYSTEMS
PERIOD

MODULE AVAILABILITY
105
106
107
108
109
110
111
11?
SYSTEl" 97.0
	 	 PERFORMANCE DATA 	 III""
OPERABlllTY ItLIAEllITY UTILIZATION X REMOVAL PER BOILER ^FGj^ f^^*R
6?.0
7R.C
55.0
i8.0
62.0
72. P
'5 "° 7ZO 717 81. C
  7/7?   101
         103
         10J
         10*
         105
         106
         107
         10*
         109
         110
         111
         112
        SYSTE*
                         76.0
                         71 ,P
                         74.0
                         75.0
                         52.C
                         75.0
                         63.0
                         62.C
                         72.0
                         66.0
                         73.0
              5.p
                                                                         7*4    6'4
75. 0
        •* PROEILEWS/SOLUTIONS/COMWENTS
              $TART  DATE    7/78     IfiUIFKENT:  HIST  ELIMINATOR
              END  DATE      7/78     fKOBltM: CHEMICAL-RELATED PLUG6JN6
                            TKf CCCURftAMCr OF PI.U66IN6 PRORLfWS IN  THE MIST  ELIMINATOR  HAS BEEN MORt
                            FREQUENT THAN NORMAL .
              AffECTED  MODULES: SYSTEM

        *• PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    7/78     EQUIPMENT:  SPRAY NOZZLES
              E«B  DATE      7/78     FSOBIfM: NOT  DEFINED/SPECIFIED
                            STRATKFR KCDl fjCATjONS CoNT 1 Ml E .
              AfFE-tTEO  MODULES: SYSTtM

        ** PBOetlMS/SOLUTIONS/COKiMENTS
              START  OAJE    7/78     EQUIPMENT:  PUMP, OTHER
              tND  DATE      7/78     PROEtlEMi NOT  D E F 1NED /S PE CI f I ED
                            THE UTILITY  IS EVALUATING NEW RUPBER  LINED  PUMPS (,///6PM)  TO HELP CORRECT
                            THE REHEATER  *'ND «  1ST ELIMINATOR PLU6GING  PROBLEMS
              AFFECTED  MODULES: SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    7/78     EQUIPMENT:  RECYCLE TANK
              END  DATE      7/78     PfCRSIM: CHEMICAL-RELATED PLUGGING
                            T*E OCCURAf'CE PF PLUGGING PROBLEMS IN  THE REHEATER  HAS  BEEN MORE
                            FREQUENT THAN NORMAL
              AFFECTED  MODULES: SYSTEf

        ** PROBLEMS/SOLUT10NS/COMNENTS
              START  DATE    7/76     EQUIPMENT:  F6D SYSTEM, GENERAL
              END  DATE
                            7/78
                            THE UTILITY IE  PREPARING FOR TH £  STATE  COMPLIANCE DEADLINE ON NOV. 1,1978.
                            CURRENTLY TES1IN6  HAS BEEN PROCEEDING ON D IFFERENT  MODULES IN AN EFFORT
                            TO FINE TUKE  THE  SYSTEM.
              AFFECTED  MODULES: SYSTtM
** PROBLEMS/SOLUTIONS/COMMENT!
      START  DATE    7/78     EOU1IMENT:  ABSORBFR
      END DATE      7/76     PROEUEn:  CHEMICAL-RELATED  EROSION
                    TI-.E FfD SYSTEM  HAS BEEN EXPERIENCING
                    VIEAR.
      AFFECTED  MODULES: SYSTEM

** PROBLEMS/SOLUTIONS/COMMENTS
      START  DATE    7/78     EQUIPMENT:  MIST ELIMINATOR
      END DATE      7/78     PROBLEM:  NOT DEFINED/SPECIFIED
                                                                           CONTACTOR  WALL AND BARBLE  BED
                                                  244

-------
                                              EPA  UTILITY FGD SURVEY: DECEMBER 1978 - JANUARY 1979
                                            SECTION  3
                    DESIGN AND PERFORM AKCE  DATA  FOR OPERATIONAL FGD SYSTEMS
....—......	..	..	PERFORMANCE  DATA-—•
PISJOD BODULt AVAILABILITY CPERABU1TY  VEL1AP1L1TY  UTILIZATION
                                                         X REMOVAL   PER  BOILER   F60    CAP.
                                                         S02  PART.  HOURS HOURS   HOURS  FACTOR
                          THE UTILITY  IS  EVALUATING NEK STAINLESS STEEL MIST ELIMINATOR WASH
                          LANCES  (TO REFLACE  THE  ORIGINAL  FIBERGLASS LANCEs> TO HELP CORRECT THE
                          REHEATER  AMD  MST  ELIMINATOR PLUGUNG PROBLEMS.
             AFFECTED MODULES;  SYSTEM
 8/78
  9/78
 102
 103
 10*
 105
 106
 107
 10*
 109
 110
 111
 112
SYSTEM

101
 102
 103
 104
 105
 106
 107
 108
 109
 110
 111
 112
SVSTEH
                    91 .0
64.C
65.Q
73.0
63.0
65.0
80.0
81.0
73.0
63.0
73.0
64.0
63.0
                                62.0
                                77.0
                                77.0
                                58.0
                                82.0
                                6?.0
                                68.0
                                80.0
                                80.0
                                55.0
                                75.0
                                                                              744
                                                                 79.C
                    97.0
                                               720   35?
                                                                                                36. C
        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   9/78     teUIFMENTs MIST ELIMINATOR
              END DATE     9/76     PROFjltM: CHEMICAL-RELATED PLUGGING
                           DIFFERENT MIST ELIMINATOR SPRAY PATTERNS ARE BEIN6 TESTED AS  POSSII3LE
                           SOLUTION TO TH  MIST FLIMINATOR PLUGGING PROBLEM REFERRED TO  IN 4ULU
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   9/78     tSUU-FENT: BOILER-RELATED
              END DATE    10/78     CCKMtNT: PREVENTIVE MAINTENANCE SCHEDULED UNIT  OUTAGE
                           IK: BOILER kAl TAKEN OFF LINE ON  SEPTEMBER  IS,  1978  FOR  A SCHEDULED
                           AUNUAL BOILER AND TURBINE INSPECTION.   THE  60 ILER CAME  PAC*  ON LINE  IN
                           TfcE MIDDLE OF OCTOBER.
              AFFECTED MODULES: SYSTEM

        **  PRObLEMS/SOLUTIONS/COMHENTS
              START DATE   9/78     EQUIPMENT: PUMP, OTHER
              END DATE     9/76     PROSIFK: NOT DEFINED/SPECIFIED
                           ThE RUBBER LI I'C D PUMPS THAT THE UTIL]TY WAS  INVESTIGATING IN  JULYt  1978
                           HAVE BEEN ORDfFED.  FOUR OF THE PUMPS HAVE  BFEN  RECEIVED AND  ONE  IS
                           INSTALLED.  THE OTHERS WILL BE INSTALLED AS  THEY COME  IN
              AFFECTED MODULES: SYSTEM
 10/7B
101
 102
 103
 104
 105
 106
 107
 108
 109
 110
                                95.0
                                65.0
                                88. C
                                81.0
                                71.0
                                78.0
                                77.0
                                fc3.0
                                &5.C
                                61.0
                                                 245

-------
EPA UTILITY F6D  SURVEY!  DECEK&fN 1<>7!  - JANUARY 1979
                                            SfCTlON 3
                     DISHN  AND PlRfCFUAKCE DAT* tOt OPFRAT10NAL  F6D  StSTFMS
---------------------- _ ........... -------- PERFORMANCE DATA ---- >
PERIOD MODULE AVmABHITY  OPERAHILITY  PLIABILITY UTILZZAT10N
                                                                                   BOIt|«
         111
        SYSTEM
                                ?*.n
                                70. n
                    9?.Q
                                                                               744
                                                                                                  37. C
 11/7?
           PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   10/78      IQUIfMENT: PUMP, OTHER
              tND  DATE     10/78      ffORLEM: NOT DE FXMED/S PECI Fl E»                             .,..„.,
                           ThE  2 IN.  D1A. SS RODS IN THE PRIMARY CONTACTOP  WERE  RFPLACED WITH 6<518)
                           01A.  CKRAMt  COATED C.S. RODS. THt CERAKIC SLEEVES  ARE  9/1« IN. THICK.
                           PKEPARIN&  THE «
-------
                         EPA  UTILITY  fGD  SURVEY:  DECfMBER 1978 - JANUARY 1979
                       SECTION  3
DES16N AND PE«FOBMAUCE  6ATA FOR OPERATIONAL  F6D SYSTEMS
PERIOD

MODULE AVAILABILITY
107
108
109
110
111
112
SYSTEW
OPERABILITV PLIABILITY UTILIZATION
61.0
69.0
96.0
92.0
*3.C
93.0
X REMOVAL PER
SO? PART. HOURS
744
BOILER FGD
HOURS HOURS
688
CAP.
FACTOR
65.8
                            Z47

-------
FP» UTILITY  F6D  SURVEY: DECtMBER  197J  -  JANUARY 1979
                                             SECTION 3
                     DESIGN AND  PE R FOFM A t
 ******
******
   369.1
   680
(407 TPH)
12
RECTANGULAR VARIABLE THROAT  ROD  DECK VENTURI
COMBUSTION ENGINEERING

CARBON  STEFU INLFT, 316L  SS  SKlRTt 316L VENTURI
316L  SS RODS
    2ft
CERAMIC
    9.0
   122.6        ( 259900 ACFn>
   154.4        (  310 F)
   223.0        ( 354P 6P«)
    1.9        (14.0 6AL/1000ACF)
    3.7        (   15 IN-H20)
    24.4        <   80.0 FT/S)
THROWAWAY PRODUCT
WET  SCRUBBING
LIMESTONE/ALKALINE FLYASH
COMBUSTION ENGINEERING
BLACK  AND VEACH
FULL-SCALE
NEW
   99.CQ
   50.00
  4/77
  4/77
 12
 MARBLE BED
  4/77
 COMBUSTION
     1
                                                  248

-------
                                            EPA UTILITY F6D SURVEY:  DECEMBER  1978  -  JANUARY  1979
                   DESIGN  AND
                                          SECTION 3
                                          DATA TOR OPERATIONAL FGD SYSTEMS
   DIMENSIONS
   SHELL MATERIAL
   SHELL LINER MATERIAL
   INTERNAL MATERIAL
   NUMBER Of  NOZ7LES
   NOZZLE TYPE
   BOILER LOAD/ABSORBER  - %
   GAS  FLOW - CU.M/S
   6AS  TEMPERATURE  -  C
   LIBUID RECIRCULATION  RATE -
   L/6  RATIO  - L/CU.K
   PRESSURE DROP  -  KPA
   SUPFRF1CAL 6A$  VELOCITY - M/SEC
   PARTICULATE INLET  LOAD - f/CU.Ci
   PARTICULATE OUTLET LOA D- G /CU.fi
   PARTICULATE REMOVAL EFFICIENCY - X
    S02  INLFT  CONCENTRATION - PPM
    S02  OUTLtT CONTRAT10N - PPC
    S02  DESIGN REMOVAL EFFICIENCY - *
18X26.5
CARBON STEEL n/4  IN)
CEILCOTE FLAKE  FIBERGLASS
316L SS PERFORATED PLATE.  FRP  SPRAY  HEADERS
   54
CEpACIC
  94.38
  5«.4
 120.
   1.3
     .5
   9.4
   6.9
     .1
  99.0
 700
 I2C
  55.0
                ( 200000 ACFfO
                (   130  F)
                ( 1900  GP|n>
                t   9.5  GAI/1000ACF)
                ( 2.0 1N-H20)
                ( 31. P  FT/S)
                ( 3.000 GP/SCF)
                (   .036 6R/SCF)
** FANS
    NUMBER
    TYPE
    CONSTRUCTION MATERIALS
SCRUBBER  I.D.
CARBON STtFL
** MIST
    NUMSER
    TYPE
    CONSTRUCTION MATERIAL
    CONFIGURATION
    NUMBER OF STAGES
    NUMBER OF PASStS
    FREEBOARD DISTANCE - K
    VAN? SPACING - CM
    WASH SYSTEM
    SUPERFICIAL GAS VELOCITY - M/S
    PRESSURE DROP - K.PA

** PROCFSS CONTROL CHEMISTRY
    CONTROL VARIABLES
    CONTROL RANGE
    CONTROL MANNER
    MODE

** PUMPS
    SERVICE
    POND RETURN WATER
    THICKENER
    KAKEUP WATER
    ******
    RECYCLE
    SPRAY

 ** TANKS
    SERVICE
    REACTION
    MAKEUP WATER
    SLURRY MAKEUP

 ** REHEATFR
    NUMBER
    TYPr
    HEATIN6 KEDIL^
    TEMPERATURE BOOST  -  C
    ENERGY RE6UIRED
    NUMBER
    TYPE
    DIAMETER - I*
    OUTLET SOLIDS  -
12
CHEVRON
FRP
HORIZONTAL

     *
     ?.20        (10.5  FT)
    10.2         (  4.00  IN)
INTERMITTENT  UPWARD WASH  ROTATABLE,  120-150 PSI6
     9.4         (  31.C  FT/SJ
      .0         (   .0  IN-H20)
SLURRY  PH,  SLURRY  SOLIDS,  TANK LfVfLS,  PRESSURE
PRESSURE  DROP  M IN H20.  10X  SOLIDS, PH>5-5.5
AUTOMATIC
FEEDBACK
    1
    1
    1
    i
    I
   12
 Nl/KBFH

    1
    1
    1
 11
 IN-LINE
 280 F  HOT  WATER
    22.?         <   40 F>
 132 MM BTU/H
 1
CENTFR
   4?. 8
   28.0
             DRIVE
                (160 FT)
                                               249

-------
EPA UTILITY  ftO  SUPVEY:  DECt«bFR 197f- - JANUARY 1979
                                            SECTION  3                      i
                     DES16N AND FERFOPMAf.CE DATA  FOR OPERATIONAL FED SYSTEMS
 •• WATER  LOOP
     TYPE
                                                 OPTN
 «• REAGENT  PREPARATION EflUIPHENT
      NUMFEP.  Of  BALL MILLS
      BALL  MILL  CAPACITY- M T/H
      REA6ENT PRODUCT - X SLURRY SOLIDS
  1
 21. «
60.0
?4.0
•• TREATMENT
TYPf
SUPPL1 ER
•• DISPOSAL
NATURE
TYPt
LOCATION
TRANSPORTATION
AREA - ACRES
CAPACITY - CU.M
PERIOD
4/77












5/77









6/77












MODULE AVAILABILITY
201
20?
20!
20*
205
2P6
207
208
209
210
211
212
SYSTEM 92.Q
211
212
209
20F.
206
2C3
204
201
202
SYSTEM 91.0
201
202
203
204
205
206
207
20 e
209
210
211
212
SYSTrw 96.0
CPERAPHITY

95.0
93.0
87.0
f-3.0
84.0
94.0
74.0
91.0
67.0
85.0
86.0

91.0
9S.O
94.0
98.0
100.0
44.0
95,0
33.0
10D.O

92.0
76.0
78.0
79.0
«9.0
74.0
67.0
e-B.o
88.0
78.0
45.0
85.0

FORCIBLY OXIDIZED
NONPROPRIETAfiY
FINAL
LINED POND
ON-SITE
PIPE
500.0
SC575000 < 25000.0 ACRF-FT)
PLIABILITY UTILIZATION X REMOVAL PER BOILER FGB CAP.
$02 PART. HOURS HOURS HOURS FACTOR












57.50 99.00 720 6°7 78. C









744 6«4 75.0












720 7?0 83.0
        ** PROeLeWS/SOLUTIONS/CCMMENTS
              START DATE   6/77      ECUIFPENT:  RECYCLE TANK
              END DATf     7/77      fSCBLfM:  NOT D E FIIMEO/SPE CIF 110
                           CRACKING  AND  'UBBLIN6 OF THE CE1LCOTE LINING  HAS BEEN OBSERVED ABOVE  THE
                           LIQUID LEVEL  CF  THE  INTERNAL RECYCLE  TANK.
              AFFECTED MODULES:  SVSTEP
                                                 250

-------
                                              EPA UTILITY  F6D  SURVEY:  DECEMBER 1978 - JANUARY 1979
                                            SECTION 3
                     DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL  F6D  SYSTEMS
PERIOD MODULE AVAILABILITY  CPERABIIITT
                                        • ---PERFORMANCE DATA-----
                                        PLIABILITY UTILIZATION
                                             X  REMOVAL    PER   BOILER  FED   CAP.
                                             S02   PART.  HOURS HOURS  HOURS FACTOR
7/77 201
202
203
2C4
205
206
2D7
2C8
209
210
211
212
SYSTEM 97.0
96. C
87.0
B6.0
97.0
96.0
68.0
ffl.O
95.0
57.0
93.0
94.0
67.0
744 602 72. C
  8/77   201
        202
        203
        204
        205
        206
        207
        20 £
        209
        210
        211
        212
        SYSTEM
            fifi.O
            75.0
            67.0
            62.0
            £4.0
            35.0
            81.0
            eo.o
            56.0
            79.0
            71.0
            33.0
93.0
                                                           744
                                                                             69.0
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START -DATE   8/77      EfiUlIMENT:  PUMP, OTHER
              END DATE     9/77      PROBLEM:  NOT DEFINED/SPECIFIED
                           SFRAY PUMPS  WiTE OVERHAULED.
              AFFECTED MODULES:  20*     2 Co

        ** PRObLEMS/SOLUTIONS/cOKMfNTS
              START DATE   ?, 117      EOUII^ENT:  SPR*Y NOJILtS
              END DATE     9/77      PRGPLEM:  NOT DE FINED/S PT CI F I ED
                           TfcC  SPRAY NOZZLES  REfiUIRED EXTENSIVE CLEANING.
              AFF£.;cTEO MODULES:  206     2 C9
  9/77
        2P1
        202
        203
        204
        205
        206
        207
        209
        210
        211
        212
        SYSTEM
94.0
            89.0
            61.0
            £2.0
            90.0
            ei.o
            82.0
            52,P
            56.0
            87.0
            73.0
            £6.0
                                                           720    717
                                                                              83.C
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    8/77      teilF'NENT: TANK» OTHER
              END DATE      9/77      PROEUM! CHEMICAL-RELATED  ER.OS10N
                            THE  STRAINEHS IN THE REACTION -TA.NK  HAVE  STARTED  ERODING.
                            REPLACING THEF< VERY SOON.
              AFFCCTED  MODULES:  207    2(9
                                                                  NSP  ANTICIPATES
 10/77  201
        202
        203
        204
        2P5
             98.0
             89.0
             *7.0
             f.6.0
             62.0
                                                 251

-------
EPA UTILITY f&D SURVEY:  DtCECBfR  197£ - JANUARY 1979
                                            SECTION 3
                     DESIGN  AMP  PERFORMANCE DATA fOR OPERATIONAL FGo SYSTFMS
			PERFORMANCE DATA	"	
PtRIOD MODULE  AVAILABILITY  OPEPAB1LITY  PLIABILITY UTILIZATION  * REMOVAL    PER   BOILER  F60   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS  FACTOR
207
206
2C8
209
210
21J
SYSTEM 9->.o
98.0
99.0
9J.O
96.0
96. 0
61. C







744 684 85. C
        ** PROEiLEMS/SOLUIIONS/CCMMENlS
              START  DATE   10/77      I Oil I (KENT:  PUKP, OTHER
              END  DATE     11/77      PR061FM: NOT DCF1NED/SPEClfI ED
                           THE  LOW  OHRA' 1LITIES ARE PUE TO SPRAY WATER PUMP OVERHAULS.  24 PUMPS
                           ACE  BEING OVERHAULED.
              AFFFCTEI)  MODULES:  SYSTtK

        •• PROttlEMS/SOLUTlONS/COHMENlS
              START  DATE   10/77      E6U1H»1INT:  F6D  SYSTEM, GENIftAL
              END  DATE     11/77      If-OELfM: C HIHI CAL-RELATE D EROSION
                           SIRAINtR/d'ASN K<  SCREEN EPOS10N HAS BEEN A PROBLEM.   316  SS MATERIAL WILL
                           Et UPtD  IN  THf  FUTURE.  REPLACEMENT MATERIAL IS  EXPECTED TO ARRIVE IN
                           DECEMBER  AND  kORK IS EXPECTED TO LAST FOR THREF  MONTHS.
              AFFECTED  MODULES}  SYSTIP
11/77
 201
 2C2
 2P3
 JO*
 205
 204
 207
 20«
 209
 210
 211
 212
 SYSTEM
12/77  201
       202
       203
       204
       2C5
       206
       2P7
       2P8
       209
       210
       211
       212
       SYSTEM
                    91.0
                   93.0
 1/7B
2P1
2P2
203
204
2C5
20«
207
208
209
210
211
212
SYSTEM
                   92.Q
                                65.0
                                fcO.O
                                93. C
                                73.0
                                75.0
                                66.0
                                94.0
                                77. P
                                91.0
                                65.0
                         53.0
                         93.0
                         94.0
                         P1.0
                         89.0
                         95.0
                         93.0
                         n.o
                         62.0
                         B2.0
                         90.0
                         92.0
                                91.0
                                7«..0
                                64.0
                                72.0
                                74.0
                                67.0
                                91.0
                                fe&.O
                                77.0
                                72.0
                                73.0
                                84.0
                                                                                     715
                                                                                          85.0
                                                                               744    73S
                                                                                          84.0
          MOBLiMS /SOLUTIONS /COMMENTS
             START DATE  12/77     teUIICENT:  ABSOBBfR
             EKO DATE     1/78     CRORUNl NOT DEF1NEB/SPF CI MEO
                                                                               744    602
                                                                                          73.0
                                                252

-------
                                              EPA UTILITY FGD SURVEY: DECEMBER  1978  -  JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PERFORMANCE  DATA FOR OPERATIONAL FGD SYSTEMS
.	....	...	PERFORMANCE DATA	
PERIOD HODULE AVAILABILITY  OPERAB1LITY  PLIABILITY UTILIZATION
                                                          X REMOVAL   PER  BOILER  FED   CAP.
                                                          S03  PART. HOURS HOURS  HOURS FACTOR
 2/78
  3/7*
                   THE REPLACEMENT OF  STRAINER  SCREENS  WAS BEGyN ON DECEMBER ?t.
                   4-6 DAYS  FOR  fcORK ON  EACH  MODULE.
      AFFECTED MODULES: SYSTEM

201                      83.0
202                      85.0
203                      55.0
204                      91.0
205                      89.0
206                      76.0
207                      71.0
208                      89.0
209                      65.0
210                      81.0
211                      97.0
212                      60.0
SYSTEM      92.0                                                       672   620

** PROBLEMS/SOLUTIONS/COMMENTS
      START DATE   2/76      (CU1FMENT: A8SOPBFR
      END DATE     2/76      PROBLEM: NOT D I FINED/S PF Cl F UD
                   STRAINER  ROD 1MCATIONS WfRF  PERFORMED ON MODULES 203 AND 212.
      AFFFCTED MODULES: 203     £1?
                                                                                           IT  TAKES
                                                                                                 77.C
201
202
203
204
20$
206
207
208
209
210
211
212
SYSTEM
                    97.0
                                92.0
                                90.0
                                H.O
                                7B.O
                                P5.0
                                91.0
                                62.0
                                83.0
                                78.0
                                te.o
                                £9.0
744   74<
        *• PROULEMS/SOLUTIONS/COMMENTS
              START DATE   3778     tOUll^ENT;  F6D  SYSTEM,  GENERAL
              END DATE     3/78     COMM HUTS:
                           Ttfc UNIT t-ENFKATED MAXIMUM  MEGAWATT-HOURS AND THE F60 SYSTEM TIED THE
                           H16HEST RtcORttD  AVAILABILITY 0F S? PERCENT.
              AFFECTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUT10N!i/COMMENT$
              START DATE   4/78     E6UI r-l*ENT:  ABSOPBFR
              tND DATE     «/78     COMMt^TSr
                           MODULE 201 WAJ  CONVERTED TO A SPRAY TOWER DURIN6 ApRIL.
              AFFFCTE-D MODULES:  201

        •* PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   3/76     EOUIf^ENT:  ABSORBFH
              ttttt DATE     ?/7E     FRGBLrM: NOT DE FINED/S PF. CI FI ED
                           STRAINTR FiCDIIJCATIONS WFRF PERFORMED ON MODULES 208 AND 210.
              AFFECTED MODULES:  ?0f.     2 1C1
  4/7B  201
        202
        203
        204
        205
        206
        207
        208
        209
                         70.0
                         82.0
                         90.0
                         t>4.0
                         «1.0
                         fJ.O
                         64.0
                         £6.0
                         7K.O
                                                 253

-------
EPA UTILITY  FGD  SURVEY: DECIDER I97f - JANUARY  1979
                                             StCTION  i
                     DtSI6N AMD PERFORMANCE  DATA  ffl* OPERATIONAL F6D SYSTEMS
	.	.		PERFORMANCE  DATA-"--"	"	      -
PERIOD MODULE  AVAILABILITY CFERAPILITY  PLIABILITY  UTILIZATION  * REMOVAL   PER   BOILER  FGD    CAP.
                                                                  S02  PART.  HOURS  HOURS  HOURS  FACTOR
        210
        211
        212
        SYSTEf
                         90.0
                         67.0
                         £5.0
                    92.0
                                                                        720    719
85.0
        **  PROEiLCMS/SOLUTIONS/COMMENlS
              START DATE   4/77     f OUI IF ENT:  FED  SYSTEMt  GENERAL
  5/7P
        201
        202
        203
        204
        205
        206
        207
        208
        209
        210
        211
        212
        SYSTEP
       END  DATE      5/77
                    FROM FULL SCAU  STARTUP ON APRIL  1.  THE  SYSTEM HAS BEEN OPERATING  VERY
                    Will WITH NC 'JMOR PROBLEMS ENCOUNTERED.   THE UTILITY IS  MAINTAINING A
                    SCHEDULE OF Nlf.HTLY CLEANING ON THE.  SCRl'EiBFRS.  THE CURRENT  SCHEME IE SUCH
                    TMT EACH POD LIE IS CLEANED AFTER  7.8  DAYS.
       AFfFCTED  MODUl tS: SYSTtl"

                         97.0
                         94.0

                         9o)o
                         90.0
                         69.0
                         90.0
                         9?.0
                         ?P..O
                         91.0
                         78.0
                         14.0
                    91.0
                                                                        744
                                                                                                  13.C
        **  PRCBLEMS/SOLUTIONS/COMMENTf
              START DATE   5/76     ICUIH1ENT:  APSORBFR
              END DATE     5/7R     PROBUM: NOT  DEFINED/SPECIFIED
                           ThERF WERE LIffR FAILURES  (CflLCOTE) IN MOST OF THE  MODULES DURING MAY.
                           THE LINERS KEfE REPAIRED BY THE  CE1LCOTE COMPANY AT  THEIR  OWN EXPENSE.
              AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMNENTS
              START DATE   5/78     EGimfENT:  BOILER-RELATED
              END DATE     5/78     COBPUNT: PREVENTIVE  MAINTENANCE SCHEDULED  UNIT  OUTAGE
                           TkE UNIT kEKT DOWN ON  MAY  * FOR  THE  FIRST YEAR BOILER  AND  TURBINE INSPEC-
                           TION AND k*s  IOWN THE  REMAINDER  OF
              AFFECTED MODULES: SYSTEM
 6/78
 7/78
2ni
202
203
204
205
2C6
208
209
210
211
212
STSTEM

201
202
203
204
205
206
207
208
209
210
211
                    95.0
                                77.0
                                46.0
                                41.0
                                67.0
                                62.0
                                62.0
                                78.0
                                60.0
                                62.0
                                76.0
                                75.0
                                89.0
                                62.0
                                93.0
                                90.0
                                64.0
                                ft.O
                                67.0
                                64.0
                                M.O
                                73.0
                                                                                720   572
64.G
                                                 254

-------
                                             EPA UTILITY  FGD SURVEY:  DECEMBER  1978  -  JANUARY  1979
                                           SECTION 3
                    DESIGN AND PERFORMAUCE DATA FOR OPERATIONAL  FGD  SYSTEMS
	PERFORMANCE DAT A	
PERIOD MODULE AVAILABILITY OPERAB1L1TY  PLIABILITY UTILIZATION
                                             X REMOVAL   PER  BOILER  FGD   CAP-
                                             S02  PART. HOURS HOURS  HOURS  FACTOR
       212
       SYSTEM
95.Q
                               71.0
74*   697
                                                                                                75.0
       *• PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   7/7B     EOUIfCENT:  PUMP,  OTHER
             END DATE     7/78     PROBLEM: NOT DEFINED/SPECIFIED
                          THE UTILITY If EVALUATING  NEW  RUBBER  LINED  PUMPS  (8000  6PM)  AS  POSSIBLE
                          SOLUTIONS TO  THE MIST ELIMINATOR  AND  REHEATER  PLUGGING  PROBLEMS.
             AFFECTED MODULES:  SYSTEM

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   7/76     ESUIF'PENT:  MIST ELIMINATOR
             END DATE     7/78     P HOB If Hi NOT DEFINED/SPECIFIED
                          1H UTILITY IS EVALUATING  NEW  STAINLESS  STEEL  MIST  ELIMINATOR HASH  LANCES
                          (1C REPLACE OM61NAL FIBERGLASS LANCES).
             AFFECTED MODULES:  SYSTEM

       ** PROULEMS/SOLUTIONS/COMNENTS
             START DATE   7/78     FOUItMENT:  ABSORBER
             END DATE     7/78     PROBUM; CHEMICAL-RELATED  EROSION
                          The FGD  SYSTEM HAS  BEEN  EXPERIENCING  PRIMARY  CONTACTOR  WALL  AND MARBLE
                          BED NEAR.
             AFFECTED MODULES:  SYSTEM

       •* PROBUEMS/SOLUT10NS/COMMENU
             START DATE   7/7B     r«UIIKENT:  F6D  SYSTEM, GENERAL
             END DATE     7/76     COMMiMTS:
                          TtiE UTILITY IS PREPARING FOR  THE  STATE COMPLIANCE  DEADLINE  ON NOVEMBER  1.
                          CORRENTLY   TESTING  HAS  BEEN  PROCEEDING ON DIFFERENT MODULES  IN  AN EFFORT
                          TO FINE  TUNE  THE  SYSTEM.
             AFFECTED MODULES:  SYSTEM

       »* PROULEMS/SOLUTIONS/COMMENTS
             START DATE   7/78     EQUIPMENT:  RECYCLE  TANK
             END DATE     7/78     ffiGBITM: C HEMI CAl-RELATE 0  PLUGGING
                          PLUGGING PROBLEMS IN .THE REHEArER HAVE BEEN MORE  FREQUENT  THAN  NORMAL.
             AFFECTED MODULES:  SYSTtK

       •* PftOBLEMS/SOLUTlONS/COMMENTS
             START DATE    7/78     tCtlfENT:  ABSORBER
             END DATE      7/78     PROBlPMs NOT  DEFINED/SPECIFIED
                           THE  UTILITY IE IN THE  PROCESS  OF  RfMINING THE ORIGINAL  ZURN DUPLEX
                           STRAINERS  AND REPLACING  THFM  WITH 516 SS STRAINERS.
             AFFECTED MODULES'  S^SUP

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATF    5/7t     ICUIffiENT:  ABSORBER
             END DATF      5/7S     PROBLFM: NOT  DEFINED/SPECIFIED
                           TM:  IKLET  SEAL  STRIPS  UERE REPAIRED.
             AFFECTED MODULES:  SYSTtr

       ** PRObLEMSASOLUTIONS/COMMENTS
             START DATE    7/7F.     tOUI FlfENTs  MIST ELIMINATOR
             END DATE      7/76     F-fC!P|PM: C HEMI CAL-RELATE 8 PLUGGING
                           PLUGGING PROBirMS  IN THE MIST  ILIKINATOR H*VE SEEN MORE FREQUENT  THAN
                           NCRMAL.
             AFFECTED MODULtS:
  8/78  Z01
        Z02
        203
        20*
        20S
        206
        2C7
        208
             es. n
            100.0
             4R.O
             79.0
             n.o
             7?.0
             64.0
             F7.0

-------
FPA UTILITY ftD SURVEY:  DtClCBEP  I97f  - JANUARY 1979
                                            SECTION 3
                     DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL  FED  SYSTEMS
PERIOD

MODULE AVAILABILITY
209
210
211
212
SYSTEM 91. 0
	 PERFORMANCE DATA 	
OPERAPILITY RELIABILITY UTILIZATION * REMOVAL
S02 PART, t
54.0
7fc.O
EO.O
71.0
PER BOILER FG
•(OURS HOURS HOU
744 695
t> CAP*
RS FACTOR
73.0
        *•  PROPLEMS/SOLUT10NS/COMMEMTS
              START  DATE    ?/78      EGUIH'IENT: F6D SYSTEM* GENERAL
              eMD DATE      9/7?      COMWtNTS:
                           MC FCD RELATE! OUTAGES KERF REPORTED BY THE UTILITY  FOR  THF AUGUST-SEP
                           TIMBER REPORT PERIOD .
              AFFECTED  MODULES:  SYSTEM
  9/78
        201
        202
        21?
        ZDA
        205
        206
        207
        208
        209
        210
        211
        212
        SYSTlf
96.0
            73.0
            8Z.O
            70.0
            61.0
            74.0
            64.0
            e?.o
            72.0
            75.P
            7S.O
            82.0
            68.0
720   720
78.0
        **  PfiOtiLEnS/SOLUTTONS/COKNENTS
              START DATE   9/78     IClIlfEKT: PUMP, OTHER
              EMI) DATE     9/78     COM" *NTS:
                           Tt-E RUHBER LIKD PUMPS THAT THE UTILITY  WAS  INVESTIGATING HAVE BEEN
                           OKDERED.  FOUf OF THE PUMPS HAVE bltU RECEIVED  AND  ONE IS INSTALLED.
                           OTHERS WILL BE INSTALLED AS THtT ARE  RECEIVED.
              AFFECTED MODULES: SYSTtf

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   9/78     iOLI FMENT: MIST ELIMINATOR
              END DATE     9/78     H>CB|,f|i!: NOT D E FINED/SPTCI f I ED
                           DIFFERENT MSI ELIMINATOR SPRAY PATTERNS ARE  BEING  TESTED.
              AFFECTED MODULES: SYSTtM
                                                                              THE
 10/78   201
        203
        204
        205
        206
        207
        208
        209
        210
        211
        212
        SYSTEM
94.0
            90.0
            79.0
            59.0
            73.0
            69.0
            64.0
            7e».0
            76.C
            7?.0
            69.0
            7?.0
            £2.0
                                                                               744   6S8
                                                                             72*0
        **  PROfcLEMS/SOLUTlOKS/COMiiNU
              START  DATE  10/78      EeUHMENT: ABSORBER
              END DATF     10/7U      CPCPIEM: NOT DEFINEB/SPECIfI ED
                           DINING OCTC&ft MODUIE 202 EXPERIENCED  STRAINER PLUS6A6E .
              AFFECTED  MODULES:  203

        *«  PROELIMS/SOLUTIONS/COKMENTS
              START  DATF  10/78      tCUIfHENTs RECYCLf TANK
              END DATE     10/76      PROBLEM: NOT DEFINED/SPECIFIED
                           DURING OCTOBER fcODULE 203 EXPERIENCED  REHEATER PROBLEMS WHICH TOfiETHFR
                           UJTH  STRAINER PLUGGING CAUSED  A  «  TO  5 DAT OUTAGE.
              AFFECTED  NODULES:  203
                                                256

-------
                                              EPA UTILITY  FGC  SURVEY:  DECEMBER 1978 - JANUARY
                                            SECTION 3
                    DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL  FED SYSTEMS
.......	—	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY  OPERARUITY tt LIABILITY UTILIZATION
                                  X  REMOVAL   PER  BOILER  F6D   CAP.
                                  S02  PART. HOURS HOURS  HOURS  FACTOR
11/78 201
202
203
204
205
206
207
208
209
210
211
212
SYSTEM 92.0
e4.o
45.0
E?.0
80.0
75.0
58.0
77.0
75.0
P3.0
83.0
7?.0
47.0
720 472 47.0
        **  PROBLEMS/SOLUTIONS/CCMMENTS
              START  DATE  11/78     E«>UIH*ENT:  POILER-RELAT E 0
              END DATE    11y78     COMMtNT: PREVENTIVE  MAINTENANCE SCHEDULED UNIT OUTAGE
                           THE LOW NOVEMlER BOILER  HOURS RESULTED FROM A TURBINE INSPECTION.
              AFFECTED MODULES: SYSTtf

        **  PROBLEWS/SOLUTIONS/COMPIENTS
              START  DATE  11/76     tCtlIHENT:  PUMP.  OTHER
              END DATE    11/78     COMMfNT: PREVENTIVE  MAINTENANCE
                           NORMAL OVtRHAU  MAINTENANCE  WAS  PERFORMED ON THE SPRAY PUMPS OF MODULES
                           2C2 AND 21?.
              AFFECTED MODULES: 202     21?
 12/76   2(51
        202
        203
        204
        205
        206
        207
        20*
        209
        210
        211
        212
        SYSTEM
 f5.0
 92.0
 89.0
 ft.O
 f.4-,0
 R4.0
 96.0
 68.C
 7?.0
 92.0
 M.O
 94.0
                                                744
77.2
        ** PKOBLEMS/SOLUTIONS/COMMEMU
              START DATE   12/7g      [6UIK»INT! FSD1 SYSTEM, 6SNIRAL
              INC DATt     1/79      H?CPiEMs VIATHIR-RELATI6 COMPONiNT  FAUURi
                           TIL  PROBLI'I'S  !NCOUNTSRiD UfRf MAINLY WfATHIR RSUAT60.
              AFFECTED MODULES:  SYSTI.f

        • * PUOf-LE^S/SCLUTlONS/CO.KENTf
              START DATE   12/78      ieuIII*INT: DOILER-Rf LAT E b
              tND DATI     1/79      PRCPL^M: NOT 6EF1NID/SPIClFICD
                           TKRF  *IRi  PRfF'LIMS WITH THE COAL FEEDER StlTS  RESULTING  IN  MOVIN6 COAL
                           FhOM  COAL STOCKPILES TO THE B01LFK.
              AFFECTED MODULlS:  SYSTlM
  1/7?  201
        202
        203
        204
        205
        206
        2fl7
        2C8
        2C9
        210
        211
 57.0
 £9.0
 91.0
 *5.0
 92.0
 fcJ.O
 75.0
 97.9
 74.0
 f,H.O
100.0
                                                 257

-------
EPA UTILITY  F6D SURVEY: DECtKBER  1?7f - JANUARY 1979
                                             SECTION  3
                     DES1CN  AND  PFRFORKAhCE DATA FOR OPERATIONAL FSD  SYSTEMS
	PER FORMANCE  DATA---	•-
PERIOD  WODULE  AVAILABILITY  CPERAPILITY rf LI At! I LIT Y UTILIZATION  X REMOVAL    PER  BOILER   FGD   CAP.
                                                                   S02   PART. HOURS HOURS   HOURS FACTOR
                                 $0.0
        SYSTEK
                                                                                 744    tf&
                                                                                                    69.f
                                                 258

-------
                                             EPA  UTILITY F6C SURVEY: DECEMBER 1978 - JANUARY  1979
                                           SECTION 3
                   DESIGN  AND  PERFORMS  DATA  FOR OPERATIONAL FED SYSTEMS
COMPANY NAME
PLANT NAKF
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION  -  NG/J
S02 EMISSION LIMITATION  -  NG/J
NET PLANT GENERATING CAPACITY  -  *v
GROSS UNIT GENERATING CAPACITY - P!U
NET UNIT GENfcRATINC CAPACITY  V/F6D - Ft
NET UNIT GENERATING CAPACITY  VO/FG6  - !"V
EQUIVALENT SCRUBBED CAPACITY  - MW

**  BOILER DATA
    SUPPLIER
    TYPE
    SERVICE LOAD
    COMMERCIAL  SERVICE  DATE
    MA-XinUM bfllLtfe  FLUE  GAS  FLOW - Ct.MS
     FLUF GAS TEKPFRATURr  - C
     STACK HE 16HT  -  *
     STACK TOP  DIAMETER  - Pi

 **  FUEL  DATA
     FUEL  TYPE
     FUEL  GRADE
     AVERAGE HEAT  CONTENT - KJ/KG
     RANEE  HEAT  CONTENT  - BTU/LE
     AVERAGE ASH CONTENT - *
     RANGE  ASH  CONTENT  - X
     AVERAGE MOISTURE  CONTENT - X
     RANGE  MOISTURE  CONTENT - *
     AVERAGE SULFUR  CONTENT - S
     RANGE  SULFUR  CONTENT - X
     AVERAGE CHLORIDE  COMTEK!  - X
     RANGE  CHLORJDF  CONTENT - 5!
     FUEL  FIRING RATE  - « T/H
     FUEL  FIRING RATE  - MW

 •« PARTICULATE SCRUBBER
     NUHPER
     TYPE
     SUPPLIER
     NUMPER  OF  STAGES
     SHELL MATERIAL
     LINING  MATERIAL
     INTERNAL  MATERIAL
     TYPE OF NOZZLES
     BOILER  LOAD/SCRUBBER  - X
     fLUE GAS  CAPACITY - CU.tf/S
     FLUE GAS  TEMPERATURE  - C
     LIttUID  RECIRCULATION  RATE - LITER/::
     L/G RATIO  - LITFR/CU.M
     PRESSURE  DROP - KPA
     SUPERFICIAL GAS VELOCITY -  K/S
     PARTICULATE DESIGN REMOVAL  EFFICIENCY
     S02 INIET  CONCENTRATION  - PPK
     S02 OUTLET CONCENTRATION -  PP*
     SOj DESIGN KEPOVAL EFFICIENCY -  £

 ** F6D SYSTEM
     SALFAeLt  PRODUCT/THROWAUAY  PRPHlCT
     GENERAL PROCESS TYPE
     PROCESS TYPE
     PROCESS A'DDITIVFS
     SYSTEM SUPPLIER
     A-E FIRM
     DEVELOPMENT LEVEL
     NEW/RFTROFIT
     PARTICULATE DESIGN  RECCVAL  EFFICIENCY
     So2 DESIGN REMOVAL  EFFUIFNCY -  J
     COMMERCIAL DATE
     INITIAL START-UP
    PENNSYLVANIA  POWER
    BRUCE MANSFIELD
    1
    SH1PPIN6POR1
    PENNSYLVANIA
    B
       15.          <   .035  LF!/MMiTU>
      25?.          (   .600  LR/MMBTU)
     Z751.0
      917.0

      Jsbio
      017.0
    FOSTFR  WHEELER
    SUPERCRITICAL,  PULVERIZED  COAL, BALANCED DRAFT
    BASE
     0/76
     1580.86        (335GOOO ACfftT
       UO.*        <  265 F)
       ?9P.          (  950 FT>
    *******        (*****  FT)
     COAL
     ilTUf
      267*9.

        1Z.90
     11.5-13.5
         7.00
     5.5-?.5
         T.OO
     1 .75-3.75
     ********
     ******
       301.1
     *****
<  11500  BTU/L8>
 11000-11950
(132 TPH)
     VARIABLE THROAT VENTUKI
     CHEMlCO

     CARBON STEfL
     POLYSTER FLAKEGL.ASS
     317 SS AND S5 WITH FLAKEGLASS LINING
     TANGENTIAL FfED C1 SET AT THRoAT,1 AT BOTTOMS
        17.0
       ?63.5        < 558333 ACFM)
       1*0.6        (  285  F)
      1386.0        (22000  GPWJ
         *.?        («0.0 GAL/100QACF>
         5.7        (   27  IN-HPO)
        61.0        <  200.0 FT/S)
- %     90.8
      3C90.000
       930.000
        92.1
     THROkAUAY PRODUCT
     WET SCPUfblKG
     LIME
     TH10SORBIC
     CHFMICO
     GILBERT/COMKONWEALTH ASSOCIATES
     FULL-SCALE
     NEW
. X     99.»o
        9?.10
      6/7*
     12/75
                                                259

-------
EPA UTILITY  FbD  SUPVTY: DECtlETR 19?t  - JANUARY  1979
                                             SECTION  3
                     DF.S1GN AND PERFORMANCE  DATA  FOR OPERATIONAL tGD STSTF.HS
UP
       . X
 ** AtSORE'ER
      MUMEER
      TYPt
      INITIAL  START
      SUPPL1 ED
      DIMENSIONS
      SHELL.  MATERIAL
      SHELL  LINER MATfKIAL
      1NTFRNAL  MATERIAL
      N027LF.  TYPE
      BOILER  LOAD/AE>SORBER
      6AS  FLOk,  - CU.K/S
      GAS  TEKF'tRATURE - C
      LI fill 1C  REC1&CULATIOM RATE  - LIlfR/S
      L/t  RATIO - L/CU.M
      PRESSURC  DROP - KPA
      SUPFRFICAL GAS VELOCITY -  l»/SFl
      SOE  1NLFT CCNCENTRAT 10K -  PPM
      SOI  OUTLET COHTRAT10N  - fPf
      S02  BESIbN REMOVAL EFFICIEfcCY  -  X

  **  FANS
      TYPf
      CONSTRUCTION MATERIALS
      SERVICE - WET/DRY
FIXED THROAT VENTURl
1Z/75
CHFMHO
U DIA X ST.5  HIGH
CARBON STEfL
POLTFSTER  FLAKEGLASS
CAPBON STEEL,  FLAKE6LASS LINING
TANGENTIAL  FF.ED
   17.C
                <  426600 AtF«)
                (   127 F)
                (19400 GPM)
                (  «s.o 6
                <  8.0  IN-H20)
                (100.0 FT/S)
                                201.31
                                  6.0
                                 30.5
                                                   6
                                                  I .D.
                                             LINED  C.S.;  BLADES-INCONEL 625
                                                  WET
      KUMPER
      Trpr
      CONSTRUCTION MATERIAL
      CONFIGURATION
      MUMPER OF STAGES
      NUMER OF PASSES
      VANE SPACING - CM
      VANF ANGLES
      UASH SYSTEM
      SUPERFICIAL GAS VELOCITY  -  N/S
      PRESSURF DROP - KPA

  •• MIST CLIWINATOR
      NUMPER
      Trpr
      CONSTRUCTION MATERIAL
      CONFIGURATION
      NUMBEF OF STAf[S
      NUMBER OF PASSES
      VANf SPACING - CM
      VANE ANCLES
      LASH SYSTEM
      SUPERFICIAL GAS VELOCITY  -  K/S
      PRESSURE DROP - KPA

  ** PUMPS
      SERVICE
               RECYCLE
      SCRUBBER RECYCLE  (SPARE)
      LIMF SLURRY TRANSFER
      ******
      ABSORBER RECYCLE
      ABSORBER RECYCLE  
      THICKENER UNDERFLOW TO  MIX  TANK
      THICKFNER TRANSFER

  «•  TANKS
      SERVICE
      THICKENER
      *I»IN6 TANK fCALCILOX  I  THCKSR  UNDR
      SLUDGE TRANSFER
      MIXlNf- TANK CSPFNT SlUSRT  t  FLVASH2
      RECYCLE (SCRUPFiFR)
                              FRP
                              HOPI70NTAL  (?-SHAPE)
                                  1
                                  t
                                  7.6         (  3.00  IN)
                              90 DFG.
                              OVERSPRAY/UNDERSPRAYt  ONE/SHIFT FOR OVERSPRAY,  C
                                 30.5         (100.0  FT/S)
                                   .1         <   .3  IN-H20)
                              tHFVRON-SCRUttBCR
                              FRP
                              HORIZONTAL  (?-SHAPE)
                                  1
                                  ^
                                  7.6         (  3.00  IN>
                              90 DFG.
                              OVERSPRAY/UNDERSPRAY,  ONCE/SHIFT FOR
                                 30.5         (100.0  FT/S)
                                   .1         (   .3  1N-H20)
                                                  NUMBER
                              NOMBFR

                              ****
                                 2
                              ****
                              ****
                                 6
                                                 260

-------
                                            EPA UTILITY  FGB  SURVEY:  BECEMBER  1978  -  JANUARY  1979
                                           SECTION 3
                   DES16N AND PERFORMANCE  6ATA FOR OPERATIONAL  FED  SYSTEMS
    RECYCLE (ABSORBER)

«• REHEATER
    NUMBER
    TYPE
    TEMPERATURE BOOST - C
    ENERGY REQUIRED

** THICKENER
    NUMBER
    TYPE
    CONSTRUCTION MATERIAL
    9IAMETER - M
    OUTLET SOLIDS - %

»* WATER LOOP
    TYPE

** REAGENT PREPARATION EQUIPMENT
    NUMBER OF SIAKERS
    SLAKER CAPACITY - M T/t

 »* TREATMENT
    TYPE
    SUPPLIER
    CONTRACTOR
    PRODUCT  CHARACTERISTICS

 ** DISPOSAL
    NATURE
    TYPE
    LOCATION
    TRANSPORTATION
    AREA  - ACRES
    CAPACITY  -  CU.M
                                              DIRECT  COMBUSTION
                                                  2?.2         (
                                              28  BTU/H
F>
                                              RAKE  DRIVE
                                              CARBON  STEEL
                                                 61.0         (200  FT)
                                                 30.0
                                              OPEN
                                                              <   2.2  TPM)
                                               CALCILOX
                                               PROPRIETARY
                                               DRAVO
                                               CONSISTENCY  OF  GRANULAR SOIL
                                               FINAl
                                               LANDFILL
                                               OFF-SITE
                                               PIPE
                                                140D.C
                                                 59927QOO      <  490(70.0  ACRE-FT)
...	......			......PER fORMANCf DATA-----
PERIOD MODULE  AVAILABILITY  CF'ERABILIIY  Kf LIABILIT Y  UTILKATION
                                                               x  REMOVAL    PER  BOUER  FED   CAP.
                                                               S02   PART.  HOURS HOURS  HOURS  FACTOR
      A
      6
      t
      D
      E
      F
      SYSTEM
                                                                             744
       ** PROOlEfS/SOLUTIOMS/CCrriENTS
             START  DATE   12/75     EBUIFMENT:  FGD SYSTEM, GENERAL
             END DATE     17/75     CC*M(NTS:
                          INITIAL OPERAHON (SHAKEDOWN AND DEBUGGING) FOR  PART OF  THE  SYSTEM  COM-
                          MENCED IN DECEMBER
             AFFECTED  MODULES: SYSTEM
 0/76  SYSTEM
       **  PRPnLtMS/SOLUTIONS/COMf.ENTS
                                              FED SYSTEM, GENERAL
            START  BATE    0/76     fcGUIFPENT:
            END DATE      0/76     COMMENTS;
                         S1NCF. THE  UM1 COMMENCED COMMERCIAL  OPERATIC IN  APRIL  1976,  A  NUMBER  OF
                         PROBLEM  AREAS  HAVE BEEN  ENCOUNTERED. MAJOR  AREAS  OF  CONCERN  ARE  SPECIFIED
                         BELOW:
                          1.  EXCESSIVE  MAINTENANCE PROBLEMS WITH THE  WET  I.D. FAN  HOUSINGS.
                          2.  EXCESSIVE  WATER  ENTRAPMENT  AND  CARRY OVER  OUT OF  THE  STACK  CAUSING  A
                             STACK  MU PROBLEM.
                          3.  REHEAT BURNER PROBLEMS.
                          4.  STACK  FLUE LINEP FAILURES.
            AFFECTED  MODULES: SYSTEM

1/76   SYSTf*                                                                 744
                                               261

-------
FPA UTILITY  F6B  SURVEY:  DECEMBER I97f- - JANUARY  1979
                                            SECTION  3
                            AND PERFOPMUE DATA FOR OPERATIONAL FCD SYSTEMS
-. ------- ... ---------------------- .... ---- PERFORMANCE  0 AT A ------------------------- ' ------ " --- — —
PERIOB  MCBULE  AVAILABILITY OPEMPHITY  IFL1ABUITV  UTILIZATION  X REMOVAL   PER   BOILER  F6D   CAP,
                                                                  S02  PART. HOURS  HOURS  HOURS FACTOR


        **  PRO&LEMS/SOLUTIOMS/COMWENTS
              START  BATE   1/76     EfiUIHENT: MIST  ELIMINATOR
              END BATE     1/76     PfiOBLfM: CHEMICAL-RELATED PLU661NG
                           THE UMT SHUT DOWN  fOR  ONE  WEEK  DtE, IN PART, TO PLU66ED  MIST EL1MIN»TORS.
              AFFECTED MODULES: SYSTEK

        *«  PROBLEMS/SOLUTION S/COMMEN1S
              START  PATE   1/76     EGUIFI'ENT: FAN
              ENB DATE     1/76     PFJOBlfH: BE SIGN-RE LATtD VIBRATION
                           1H UNIT SHUT DOWN  FOR  ONE  WEEK  OUEi IN PAPTi TO I.». FAN  HOUSING VIPRA-
                           TION PROBLfHS.
              AFFECTED MODULES: SYSTIP

  2/76   SYSTEC                                                                   6?6

        **  PROBLEMS/SOLUTIONS/COMMENTE
              START  CATE   2/76     E«UJ. IMENTj REHEATER
              END BATE     J/76     FFOBIFM: NOT DEFINED/SPECIFIED
                           FIRST ATTEMPT* AT STARTING  UP  THE  REHEAT BURNERS WERE MADE THIS MONTH. SO
                           MANY PROBLEMS WERE  (.NCOUNTFRED THAT THE VENDOR IS GOING TO REDESJtN NEW
                           RtHEIT BUKNtR^
              AFFECTED MODULES: SYSTEM

  3/76   SYSTEP                                                                   7«A

  */76   SYSTEM                                                                   7?0    506

        **  PROELEMS/SOLUTIONS/COMMENTS
              START  DA1E   A /7fc     E.GUII-KENT: FSB  SYSTEM,  6ENEHAL
              [MB B'TE     4/76     CCMM ?NTS:
                           TCT^L OPeRATIH, HOURS A CCU^Ul AT£ D  TO DATE ARE AS FOLLOWS:  0, 210, 984,
                           2147, 2t.0f, AtD 2427 FOR  MODULES A THROUGH F RESPECTIVELY.  THE SCRllfBINE
                           SYSTFC IS CURffNTLY HANDLING  FLUE  GAS AT A TOTAL E8UIVALENT CAPACITY OF
                           APPROXIMATELY £40 MW (GROSS).
              AFFtCTED KODUtES: SYSTEM
  5/76   A
        e
        c
        D
        £
        F
        SYSTEM      (JO.O       100.0        100. 0         80.0                   7A4    595      0

        «*  PROBLEMS/SOLUTIONS/CORMENTS
              START BATE   5/76     tGUIIHENT:  F6B  SYSTEM, GENERAL
              ENB DATE     5/76     C
-------
                                             EF>A UTILITY  F6D  SURVEY:  DECEMBER 1978 - JANUARY 1979
                                            SECTION  3
                    DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL  FED SYSTEMS
..	......	.—.	...	......pjRf ORMANCF  DATA	•
PERIOD MODULE AVAILABILITY CPEPABILITY  ^LIABILITY  UTILIZATION
                                                         X REMOVAL   PER  BOILER  F«jO   CAP.
                                                         S02  PART. HOURS HOURS  HOURS  FACTOR
                          B25 MW    CM  JUNE  1*  1976.   OVER  THE  PERIOD A REVISED SCRUBBER BAFFLE
                          SYSTEM  WAS  INSTALLED  IN  AN  EFFORT TO CORRCCT THE SCRUBBER RECYCLE PUMP CA-
                          VITATION  PROBlfcHS.
             AFFECTED MODULES:  SYSTEM
 7/76
       A
       b
       C
       6
       E
       F
       SYSTEM
  e/76
 10/76
            90.0
100.0
                                   100.0
90.0
                                               744   673
** PROBLEMS/SOLUTIONS/COMMENIS
      START DATE   7/76     EGUIFMENT: REHEATED
      END DAT?     7/76     PROBLEM: NOT DEFINED/SPECIFIED
                   Tt-E SYSTEM SUIPLIER IS STILL  TRYIN6  TO  SOLVE  THE  REHEAT BURNER PROBLEMS.
      AFFFCTED MODULES: SYSTEM

** PROBLEMS/SOLUTIONS/COMMENTS
      START DATE   7/74     ECUIFMENT: MIST  ELIMINATOR
      END DATE     7/76     PfiOBl&M: 6ESI6N-RFLATE0  UNDERSIZED COMPONENT
                   TESTS CONDUCTS  THIS MONTH  SHOWED  THAT  THE  FGD  SYSTEM MIST  ELIMINATORS  ARE
                   NOT PERFORMING  TO DESI6N  AND  THAT  THERE  IS  EXCESSIVE WATEH  ENTRAINED  ]N
                   1H CLEANED  FU'E 6ASSES CAUSING  A  STACK  RAIN  PROBLEM. CHEMICO  !S  WORKIN6
                   Oh THE  DFSItN OF ADDITIONAL MIST  ELIMINATORS  THAT WILL  REMOVE  THIS  EXCESS
                   WATER.
      AFFECTED MODULUS: SYSTEM

A
6
C
D
£
F
SYSTEM      95.0       100.0        100.0         95. P                   7*4    70S       0

»* PRObLEMS/SOLUTIONS/COKMENTS
      ST*RT »»TE   P/76     tCUI^ENT: MIST  ELIMINATOR
      END  DATE     S /76     CCMMiNTS:  RESEARCH AND  ti EVELOPK |NT
                   SECONDARY  VERTICAL  MIST  ELIMINATORS  WERE INSTALLED IN  THE  ABSORBE» D""
                   CHAR6E  DUCT  U  AN ATTEMPT TO  REDUCE  THE EXCESSIVE ENTRAINED WATER. THEY
                   DID NOT WORK 16CAUSE  THE  FLUE GAS  BLEW THEM APART IN A FEW MINUTES OF OP-
                   ERATION.
      AFFECTED  MODULES:  SYSTEM
C
0
E
F

SYSTEM
                   100.0
                        100,0
             100.0
                                                        100.0
                                                                               720    720
        SYSTEM
                    99.0
                                100.0
                                    100.0
                                                         99. P
                                                                               744    720
 11 / 76  A
        B
        C
                                                 263

-------
EPA UTILITY FGB SUPVFY:  DEC£l»bER l97f  - JANUARY 1979
                                            SECTION 3
                     DES1CN  AND  PERFORMA^E DATA FOR OPERATIONAL  F6D  SYSTEMS
			pERf ORMANCF DATA	""
PERIOD MODULE  AV'ILABHITY OPERAPILITY ttLIABlLITV UTILISATION   X  REMOVAL    PER  BOILER   FGD    CAP.
                                                                  S02   PART. HOURS HOURS  HOURS  FACTOR
        D
        I
        f
        SYSTEM
                    3P.O
                               10D.O
                                   100.0
                                                                       720    277
        • *  PRObLEPS/SOLUTlONS/COMMENIS
              START  DATE   11/76     tOUI H" ENT: BOI LFR-RELATF I)
              END  DATE     11 /76     COHM INTS:
                           A  THPEE  Wf.tK CIITA6E OCCURRFD CUE  TO  A  FURNACE  IMPLOSION.
              AFFCCTED  MODULES: SYSTFP
 12/76
** PROBL£»"S/SOLUT10NS/COMI«IENTS
      START DATE  11/76     tetlf^ENT:  F6D  SYSTEM,  GENERAL
      END DATE    11/76     COHMI-NT: PREVENTIVE  MAINTENANCE SCHEDULED UNIT OUTAGE
                   DliRING THE OU1AGE SCALE  THROUGHOUT  THE FGD SYSTEM WAS REMOVED.
      AFFECTE& ffCtUl ES: SYSTEC

•• P«OBLE»»S/SOLUT10HS/COI«IWENTS
      START DATE  11/76     E6UIFMENT:  STACK
      END DATE    11/76     PDOE>tFn: DESIGN-RELATED  INFERIOR CONSTRUCTION MATERIAL
                   DtRING THE THI^EE WEEK OUTAGE  THE  UNIT 1 CHIMNEY FLUEs WERE  INSPECTED.  THE
                   A-S1DE FLUF PCLYESTER LINING  MATERIAL WAS FLAKING OFF AND  ACID ATTACK WAS
                   STARTING TO CCRRODE  THE  CAPBON  STfcfL FLUE. THE LINING SUPPLIER IS  INVESTI-
                   GATING THE PR (CLEM.
      AFFECTED MODULES! SYSTEM

** PROBLEMS/SOLUTIONS/COMMENTS
      START DATE  11/76     tCUII-TENTl  MIST  ELIMINATOR
      END DATE    11/76     F'ROeUM: CHEMI C AL-RELA TF D  PLUGGING
                   DURING TH[; OUTAGE THE PLUGGED MIST  ELIMINATORS WERE CLEANED.
      AFFECTtD MODULES: SYSTEM

A
b
C
D
E
F
SYSTEM
  1/77
        C
        D
        I
        f
        SYSTEM
100.0

 95.0
 92.0
 77.0
 91.0
 9?.G
 VI. 0
                               100.0
                                    100.0
                        51.0
                        74.0
                        98.0
                        9T.O
                        91. 0
97.0

£9.0
g?.0
68. D
89.0
64.0
61.0
                                                                               744
                                                                               744   675
        **  PROBLEMS/SOLUTION S/CCCMEM S
              START  OATi   1/77     SCUK*ENTs F6D SYSTFK,  MINERAL
              END DATf      1/77     PSOBIFH: WEATHIR-RiLATID  COMPONINT FAILURE
                           StVERI W1NTI.R feEATHER MDi OPERATION  OF  THE OUTDOOR F6D SYSTEM  WfRY  61FFI-
                           FICULT ANti AFfFOTfcD THE RELIA6ILITY  OF  THE UNIT.
              AFFECTED  MODULtS: SYSTEM

        •*  PROBLEMS/SOLUTIONS/COMMENTS
              START  6ATE   1/77     t6U f;«ENT: THICKEMR
              END DATE      1/77     PROBLEMS MECHANICAL-RELATED  COMPONENT FAILURE
                           DLR1N6 THt FltST PART OF THE MONT* THE  THICKENER RAKE MECHANISM JAMMED AND
                           CCULD NOT B[  IEPAISID. THE TH1CKFNER  WAS OPERATED FOR APPROXIMATFLY  THREE
                           WtEKJ WITH THC RAKE STOPPED UNTIL  THE UNIT 2 THldCfNER COUUD  BE PUT  INTO
                           EftERCENCY EFFUCE.
              AFFECTED  MODULES: SYSTEM
 2/77
            77.0
            69.0
                                70.0
                                     65.0
                                     56.0
                                                264

-------
                                                EPA UTILITY  FfiO SURVEY: DECEMBER  1978 - JANUARY  i
-------
EPA UTILITY  FtD  SURVEY: DECtHPFF 1ENT:  F6D SYSTEM, GENERAL
              END DATE     5/77      COMMENTS:
                           THE UNIT  kAS  STARTED UP ON MAY 21 USING  D,  E, AND F MODULES  DUE  TO REPAIRS
                           BEING MADE TO  THE A-SIOE CHIMNEY  FLUE.
              AFFECTED MODULES:  SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              iTApT DATE   5/77      EQUIPMENT:  REAGENT HANDLING
              END DATE     5/77      F'F'OB | E M : NOT D E F IN ED/SPE Cl F I ED
                           THERE HERt PRC6LEMS  SLAKING L1M£  AND  GETTING MAGNESIUM LEuELS  BUILT UP IN
                           THE SCRUBbEH  RECYCLE LOOPS AFTER  STARTUP.
              AFFECTED MODULES:  SYSTEM
                                                 266

-------
                                              EPA  UTILITY F6D SURVEY: DECEMBER  1978  -  JANUARY  1979
                                            SECTION 3
                    DESIGN AND PERFOfcMA«E  DATA FOR OPERATIONAL FGD SYSTEMS
...	......	.	PERFORMANCE DATA	•
PERIOD MODULE AVAILABILITY  OPERABIL1TY  PLIABILITY UTILIZATION
                                              X REMOVAL   PER  BOILER   FED    CAP.
                                              S02  PART.  HOURS HOURS   HOURS  FACTOR
6/77 A
B
C
D
E
f
SYSTEM


94.0
95.0
90.0



100.0
100.0
97.0



94. C

90.0






720 6*9
       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE    K/77      EGUIFMENT: STACK
             END DATE      8/77      PKOfUfc'M: NOT DE FINED /SPECI F IE6
                           Oti  AUGUST 1t  1HE 1A CHIMNEY FLUE LINER REPAIRS WERE COMPLETED  AND  THE  A,  B
                           AkO C  TRAINS  kfRE STARTED UP.
             AFFECTED MODULES:  SYSTEM

       ** PROBLEMS/SOLUTION WCOMMENTS
             START  DATE    8/78      E.CUI f* ENT: FAN
             END DATE      */7£      PPCB(.fn: NOT DEFINED/SPECIFIED
                           SEVERAL REPAIfS WERE MADE TO TH £ ID FAN  HOUSING  THIS  MONTH.
             AFFECTED MODULES:  SYSTEM

       •« PROBLEMS/SOLUTIONS/COMMENTS
             START  HATE    £/77      teUI(»»ENT: FCD SYSTEM, GENERAL
             END DATE      */77      COfllONTS:
                           THE AVFRAtf 512 REMOVAL EFFICIENCY FOR THE  MONTH WA$  86. 7 X BASED  ON  THREE
                           6KAB  SAMPLES.
             AFFECTED MODULES:  SYSTEM

       ** PR06LEMS/SOLUTIONS/CCMMENTS
             START  DATE    F/77      i GUI FWENT: FGD SYSTEM, GENERAL
              END  DATE
                           M77
                           YORK RESEAPCH BEGAN SETTING UP  EQUIPMENT  TO  CONTINUOUSLY  MONITOR  THE  502
                           REMOVAL EFFICIENCIES AS PART OF  AN  EPA  RESEARCH  PROJECT TO  DETERMINE  FEA-
                           SIBLE NSPS FOh FGD.
              AFFECTED  MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    f/77     tCKJIIKENT: PROCESS CONTROL
              END DATE      l>/77     COMMENTS: RESEARCH AND  DEVILOPMENT
                           EXTENSIVE MOD iriCATIONS ART PEINfi MADE  IN THE  PH CONTROL  SYSTEMS  IN  AN EF-
                           FORT TO DtVlSl A WORKABLE PH CONTROL  SYSTEM.
              AFFECTED  MODULES: SYSTEM
  7/77  A
        e
        c
        D
        E
        F
 99.0
 9
-------
EPA UTILITY  FfcD  SUSVEY: DECtMBER
                                        -  JANUARY 1979
                                             SECTION 3
                     OESICN AND FERFOfKAKE  DATA FOR OPERATICNAL  FOD SYSTEMS
PERIOD  MODULE  AVAILABILITY OPEPARILJTY
                    	PER FORM AN Cf DATA	«...
                     I-EIIABILITY UTILIZATION   X  REMOVAL   PER   BOItER  f6D   CAP.
                                               SOZ  PART. HOURS  HOURS  HOURS fACTOS
D VJ.O 100.0
E 95.0 99.0
F 88. 0 95.0
SYSTEM
93.0
9?.f1
85.0
66.7Q


744


69Z
        *«  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   S/77      [CUIfENT: BOILFR-RELATED
              END DATE     t /77      COMM cNTSr
                           UMT  1 WAS  DO*  FR00 AUGUST 13  TO  15  BECAUSE OF BOILER  TUBE  LEAKS.
              AFFrCTED MODULES:  SYST11"
  9/77
        A
        a
        c
        D
        I
        f
        SYSTEW
£7.0
62 .0
81.0
57. .0
50.0
43.0
 97.0
 95.
              AFFECTED  MODULES: SYSTEM
 11/77
95.0
99.0
91.0
                                 95.c
                                 99.0
                                 91.0
                          95.0
                          99.0
                          91.0
                                                  268

-------
                                               EPA UTILITY  FGD  SURVEY; DECEMBER  1978  - JANUARY 1979
                                             SECTION 3
                     DESIGN AND PERfORMAkCI  DATA FOR OPERATIONAL FGD SYSTEMS
.„..—— — ————	PERFORMANCE 6 AT A	
PERIOD MODULE AVAILABILITY OPERABILITY  RELIABILITY UTILIZATION
                                                    X  REMOVAL    PER  BOILER   FFD    CAP.
                                                    SO?   PART. HOURS HOURS  HOURS  FACTOR
       D
       E
       F
       SYSTEM                                                                    720    720

       ** PRObLEMS/SOLUTlONS/COMMENTS
              START  DATE  11/77      tflUUMENT: STACK
              END DATE    11/77      COMMENTS:
                           REMOVAL  Of  T«r OLD COATIN6  AND  PRIMING OF THE FLUE  LINING  IN FLUF IB IS
                           PROCEEDING  SLCWER THAN ANTICIPATED.  IT IS EXPECTED  THAT  TOTAL WORK ON THE
                           FLUE  WILL NOT PE COMPLETED  UNTIL FEBRUARY OR MARCH  1978.
              AFFECTED MODULES:  SYSTEK
 U/77   A
        6
        C
        D
        E
     100.0
      93.0
      99.0
1CO.O
 94.0
100.0
91 .C
79.C
91.0
        SYSTEM
                                                                                       6?6
        **  PROBLEMS/SOLUTIONS/COMMEN1S
              START DATE   12/77      tGUIFKENT:  STACK
              END DATE     12/77      COMMENT: PREVENTIVE  MAINTENANCE SCHEDULED  UNIT OUTA6E
                            SANOpLASTIhfi f.f UNIT  IFi  FLUfc  IS NtARING COMPLETION.  THE FLUE WILL HF RE-
                            LINED WITH CXt-2000.
              AFFECTED HOCULES:  SYSTFM
  0/7B  SYSTEM
        ** PROBLEMS/SOLUTIONS/COMHtNTS
              START DATE    0/78     t&UIfMENT:  F£D  SYSTEM, GENERAL
              END DATE      0/76     COM (NTS :
                            N(iTE: AN ATTFWf'T  IS  ALWAYS MACE TO 8 E 61 N  OPERATION OF THF POILFR  AND  FGD
                                  SYSTtM  SIMULTANEOUSLY AT BRUCE MANSFIELD.   OCCASIONALLY PROBLEMS  DE-
                                  LAY POllfR  STARTUP MAKING 11 POSSIBLE  FOR  MONTHLY FGD MODULE  HOURS
                                  TO EXCEED ACTUAL  BOILER HOURS.
              AFFECTED  MODULES: SYSTEM
  1/78
        A
        B
        C
        D
        E
        F
        SYSTEM
     100.0

     100.0
100.0

100.0
                                                          58.0
                                                                   74 A
                                                                         371
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    1/78     ECUIFfENT:  BOILFR-RELATE0
              END DATE      1/7&     COM* (NTS:
                            THE UNIT TRlPfED  SEVERAL TIMES »«E  TO  DIFFICULTIES IN BURNING  WET  STOCK-
                            PILE COAL.
              AFFECTED  MODULES: SYSTEf
        ** PROBLEMS/SOLUT10NS/COI«MENTS
               START  DATE    1/78
               END  DATE
                                   FAN
              1/78      Pf:CBit>,: CHEMICAL-RELATED EROSION
              ThERF  WERE PRCF-LEKS  WITH  THE IB T™ WHICH NECESSITATED EXTENSIVE  REPAIRS.
              L1NIN6 ABRASKh AND  DISEsONDMENT IK FAN  CAUSED  CORROSION OF UNDERLYING  SUP-
              PORT  KFTAL.
AFFECTED MODULES:  SYSTEM
  2/78  A
        B
        C
        D
      79.0
      61.0
      82.0
 100.0
  £0.0
 100.0
 79. C
 61 .0
 82.0
                                                  269

-------
EPA UTILITY FED SURVEY:  DECEMBER l97f - JANUARY 1979
                                            SECTION !
                     DtSlCN AND PfRFOPMAhCE DATA FOR OPERATIONAL  FI5D SYSTEMS
PERIOD MODULE AVAHABILITY  CPCMML1TY
                                           PtRFORMANCF BAT A
                                                    UTILIZATION
                                                                             „»», •»«» .J",
        £
        F
        SYST6*
                                                                               672   414
        **  PR06LEMS/SOLUT10NS/COHKENTS
              START DATE   ?/78     CGUIItENT; F6D SYSTEM.  PENERAL
              fND DATE     ?/78     COMWINTS:
                           FMENSIVE CEPtjRS TO THE 1F< ID  FAN  AND  THE  EMERGENCY NEED FOR LOAD  FROM
                           THE PLANT DURING TH F COAL STPJITE  TEMPORARILY OVERLOADED THE 1A AND  1C
                           TRAINS.
              AFFECTED "OrULFS: f(      A      C
              START OATF   2/7S     EcimrENT: FAN
              tNO DATf     2/7f<     FPOBird: NOT DE FIKED/S Pr CI F JED
                           EXTENSIVE RfP,«IRS TO THE 1p  ID FAN  WERE  NECESSARY-
              AFFECTED WODULtS: fc

        **  PKO&LEKS/&OLUTIONS/COMMENTS
              START BATE   2/78     16UKCENTS MIST ELIMINATOR
              END DATE     lilt     PPOPLfH: HE CHA NIC AL-Rf L ATP D  COMPONENT FAILURE
                           T*E flST ILIBlNATOd WILL BE  REPLACED  ON  THE  1C TRAIN AS A RESULT  OF  THE
                           TEMPORARY OVEROAD THAT OCCURRED  CN  THE  1A AND 1C TRAIN DURJN6  THE  PFRIOt.
              AFFECTED RODULES: c
              START DATE   Z/78     ECUIH«ENT:  STACK
              £ND DATE     ?/7fc     CCMUcK'T: PREVENTIVE  MAINTENANCE  SCHEDULED UNIT OUTAGE
                           m 1ft FLUf R[LlN]NC CONTINUED.
              AFFECTED NODULES: SYSTEM
  3/78
A
e
c
D
E
f
SYSTEM

**
                    43.0
                    91.C
                    90.0
                    65.0
                    50.0
                    60.0
                                47.0
                                9ft.0
                                97.0
                                70.0
                                54.0
                                65.(1
                        45.0
                        91.0
                        90.0
                        65.0
                        50.0
                        60.0
                                                                               744    689
              START DATE   3/78     IfibllTENT:  STACK
              END DATE     3/7?     CCMKH.NT: PREVENTIVE  MAINTENANCE SCHEoULfD UNjT OUTAGE
                           REPLACEMENT 01 THE LINING  IN  THE  1B  CHIMNEY KITH CXL 2000 WAS COMPLETED.
              AFFECTED MODULES: SYSTEM

        ** PROBLEHS/SOLUTIONS/COKMENT*
              START DATE   3/76     tGUIFMENT:  FAN
              END DATF     3/78     F'RCBirM: NOT DE FINED /SPE CI F IED
                           REPAIRS WERE  MDE ON THE A, B AND  C  FAN HOUSINGS.
              AFFECTED MODULES: SYSTCH
  4/7E
        A
        e
        c
        D
        E
        r
        SYSTEM
                    74.0
                    88.0
                    49.0
                    67.0
                    97.0
                    94.0
74.0
es.o
49.0
67.0
97.0
94.0
                                                 74.0
                                                 Bfj.0
                                                 49.0
                                                 87.0
                                                 97.0
                                                 94.0
                                                                                720    7ZO
        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   4/78     EQUIPMENT:  FAN
              END DATE     4/76     PROBLEM: NOT  DEFINED/SPECIFIED
                           MISCELLANEOUS LEAK  REPAIRS  HERE  DONE ON FAN HOUSINGS.
              AFFFCTED MODULES: SYSTtM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   4/78     COUIfHENT:  GAS  PAMPER
              END DATE     4/78     PRCPLfM: NOT  DEFINED/SPECIFIED
                                                 370

-------
                                              EPA UTILITY  FGO  SURVEY:  DECEMBER 1978 - JANUARY  1979
                                            SECTION 3
                    DESIGN  AND  PERFORM«E DATA FOR OPERATIONAL  FGD SYSTEMS
........	.		—	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY  OPERABUITY PLIABILITY UTILIZATION   X  REMOVAL   PER  BOILER  F6D    CAP.
                                                                  S02  PART. HOURS HOURS  HOURS  FACTOR

                          MISCELLANEOUS LEAK REPAIRS  WERE MADE  TO
             AFFECTED MODULES:  SYSTEM
 5/7B
  6/7?
A
e
c
6
E
F
96. 0

98.0
91.0
9?.0
9?.C
97.0

97.0
85.0
84.0
86.0
                                                 59.0

                                                 59.0
                                                 52.0
                                                 53.n
                                                 53.0
       SYSTEM
                                                                               744   457
       ** PRObLEMS/SOLUTlONS/COMMtNTS
             START  DATE    5/76     IGUIFKCNT:  F6fr  SYSTEM,  {.ENtRAL
             END DATE      5 lit-     COMMENTS:
                           ThE ANNUAL EO}LER INSPECTION  OUTA6E BEGAN ON MAY 20.
             AFFECTED  MODULES: SYSTtM

       «* PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE    5/78     EQUIPMENT:  FAN
             END DATE      5/76     F>PCBlEM: NOT  DEFINED/SPECIFIED
                           EXTENSIVE REPAIRS WERE MADE  ON THE 16 FAN.
             AFFECTED  MODULES: SYSTEM
  7/78

  6/78

  9/7S
 11/78
        A
        B
        C
        D
        E
        F
        SYSTEM
           1DO.O
           100.0
           100.0
           100.0
                                                                        720
        **  PRC8LEMS/SOLUTION&/COMMENTS
              START DATE   6/78      tBUIPMENT:  HOILER-RFLATED
              END DATE     */7f      COMMENTS :
                           THE DNJT  OOTAfF  TjME WAS FOR BOILER INSPECTION AND  6ENERATOR  STATOR  COOLER
                           REPAIRS.
              AFFECTED MGDULfcS:  SYSTEM

        **  PROBLEMS/SOLUTJONE/COMMENTS
              START DATE   6/77      fCUIfPENT:  F6D  SYSTEM. eENERAu
              END DATE     6/77      CCMM LNTSs
                           ALL OUTAGES  EXPERIENCED  RY THE UNIT THIS MONTH WERE  F60-RELATED.
              AFFECTED MODULES:  SYSTEM

        **  PROBLEMS/SOLUTIONE/COMWEN15
              START DATE   fr/77      E6Uirf«ENT:  MIST ELIMINATOR
              END DATt     6/77      PPOELfM:  CHEM1CAL-RELATFD PLU6GIN6
                           HORIZONTAL hiST ELIMINATOR PRESSURE DROPS  INCREASED  TO THE POINT THAT NEW
                           MIST  ELIMINATE MODULES  WERE INSTALLED  ON  Dt  E AND  F SCRUBBERS AND D AND E
                           ALSORBERS.
              AFFECTED MODULES:  D       E       F
SYSTEM

SYSTEK

SYSTEM

SYSTEM

SYSTEM

SYSTEM

** PR06LEMS/SOLUTIONS/COMMENTE
      START DATE  12/76      EOUI f-rENT: FGD SYSTEM,  GENERAL
      END DATT     1 IT)      COMM tNTS:
7*4

744

720

7*4

7HO

744
                                                 Z71

-------
FPA UTILITY  ftD  SURVEY: DCCtf&FR 197f  -  JANUARY 1979
                                             SECTION 3
                     DESIGN AND PERFORMANCE  DATA FOR OPERATIONAL  FGD SYSTFMS
			PERFORMANCE DATA	
PERIOD HODULt  AVAILABILITY CURABILITY  t-eLIAE-ILITY UTILIZATION  *  REMOVAL   PER  BOILER   FGD   CAP.
                                                                  502   PART. HOURS HOURS   HOURS FACTOR


                           NC I^iFORI',AT10^  WAS  AVAILABLE: FOR THIS REPORT  PFRIOD.
              AffECTED MODULES: SYS*

 1/79  SYSTff                                                                   74*
                                                272

-------
                                             tPA UTILITY  F66  SURVEY:  DECEMBER 1978 - JANUARY 1979
                                           SECTION 3
                   DESIGN  AND  PER FORM ItCE DATA FOR OPERATIONAL  FGD SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICIPATE EMISSION  LIMITATION - NG/J
S02 EMISSION LIMITATION  -  ht/J
NET PLANT GENERATING  CAPACITY  - MW
6POSS UNIT GENERATING CAPACITY - fik
NET UNIT GENERATING  CAPACITY V/FGD - Mt
NET UNIT GENERATING  CAPACITY VC/FGD - '^
EQUIVALENT SCRUBBED  CAPACMY - MU

** BOILER DATA
    SUPPLIER
    TYPE
    SERVICE LOAD
    COMMERCIAL  SERVICE DATt
    MAXIMUM BO HER  FLUE  GAS FlOW - ft."/S
    FLUE GAS TEMPERATURE - C
    STACK HEIGHT  -  M
    STACK TOP  DIAMETER - M

 «*  FUEL  DATA
     FUEL  TYPE
     FUEL  GRADE
     AVERAGE HEAT  CONTENT - KJ/K6
     RANGE HEAT  CONTENT - B1U/LB
     AVERAGE  ASH CONTENT - i
     RANGE  ASH  CONTENT - X
     AVERAGE MOISTURE CONTENT  - *
     RANGE MOISTURF  CONTENT -  X
     AVERAGE SULFUR  CONTENT -  *
     RANGE  SULFUR  CONTENT - X
     AVERAGE CHLORIDE CONTEUT  - X
     RANGE  CHLORIDE  CONTENT -  *
     FUEl  FIRING RATE - * T/H
     FUEL  FIRING RATf - M V

 ** PARTICIPATE SCRUPBER
     NUMBER
     TYPE
     SUPPLIER
     SHELL MATERIAL
     LINING  MATERIAL
     INTERNAL  MATERIAL
     TYPE  OF NOZZLFS
     BOILER  LOAD/SCRUPP If -  7,
     FLUE  GAS  CAPACITY - CU.C./S
     FLUF  6AS  TEMPFRATURF -  C
     LI6UIB  RECIRCl'LATIOK R*TE  -  LITER/J
     L/6 RATIO - LITER/CU.I"!
     PRESSURE  DROP -  KPA
     SUPERFICIAL GAS  VELOCITY  - */S
     PARTICULATE DESIGN  REMOVAL EFFICIENT
     S02 INLET CONCENTRATION -  PPM
     SOZ OUTLET CONCfNTRATICN  - PPM
     S02 DESIGN REMOVAL  EFFICIENCY  -  I

 ** FGD SYSTEM
     SAlFABLt  PRODUCT/THROUAWAY PRODUCT
     GENERAL PROCESS  TYPF
     PROCESS TYPE
     PROCESS ADDITIVFS
     SYSTEM  SUPPLIER
     A-E FIR«!
     DEVELOPMENT LFVEL
     NEW/RETROFIT
     PARTICULATE DESIGN  REMOVAL EFFICIENCY
     Sfl2 DEjIfeN PEMOVAL  EFFICIENCY  -  i
     COMMERCIAL pATE
     INITIAL START-UP
                       • OM LP/MMETU)
                       .600 LR/MMBTU)
PENNSYLVANIA POwER
BRUCE MANSFJELo
i.
SHIPPjNGPORT
PENNSYLVANIA
B
   15.          {
  ?5R.          (
 2751.0
  017.0
  825.0
  880.0
  917.0
     FOSTER  UHEELER
     SUPERCRITICAL,  PULVERIZED COAL, BALANCED DRAFT
     BASE
      0/77
      1580.86        (3350000 ACFB)
                    ( 285 F)
   HC.6
   J90.
     BITUMINOUS
      267*9.

        12.90
     11.5-13.5
         7.00
     5.5-P.5
         7.00
     1.75-3.75

     ******
       •501 .1
     *****
                    ( 950 FT)
                    (***** FT)
                {  11500 BTU/LB)
                 11000-11050
                     TPH)
     VARIABLE THROAT VENTURI
     CHEMJCO
     CARBON STEFL
     POLYESTER FLAKEGLASS
     317 <=S AND SS WITH FLAKE6LASS LINING
     TANGENTIAL fEED CSET AT THROAT. SET AT BOTTOM]
        17.0
       267.5        < 558333 ACFp)
       140.6        (  285  F)
      1386.0        (2200C  6PM)
         F.3        (40.0 6AL/1000ACF)
         5.7        <   2?  1N-H20)
        61.0        (  200.0 FT/S)
- X     99.8
      3n9C.oon
       
-------
EPA UTILITY  FGD  SURVEY: DECtMPFR 19?f  -  JANUARY 1979
                                             SECTION J
                     DESIGN AND PER1CPU A'C£  DATA fOR OPERATIONAL  FED SYSTEMS
 •• AbSORBFR
      MUMPER
      TYPE
      INITIAL START UP
      SUPPLI IR
      DIMENSIONS
      SHELL  MATERIAL
      SHELL  LINER MATERIAL
      1NTFRNAL MATERIAL
      NOZ7LF  TYPE
      BOILER  LOAD/ABSORBER .  X
      GAS  FLOV - CU.M/S
      CAS  TEMPERATURE - c
      LIQUID  RECIRCULAT10N RATE  -  LITfR/!
      L/G  RATIO - L./CU.H
      PRESSURE CROP - KPA
      SUPrRFICAL 6AS VELOriTV -  K'/SFC
      S02  INLrl CPNCENTP A1 If r -  FPI":
      SO 2  OUTLET CONTRfTKt,  - rpf
      S02  DESlbN REMOVAL  FfFiClFNCV  -  X

  ** FANS
      TYPf
      CONSTRUCTION MATERIALS
      SERVICE - WET/DRY
FIXED THROAT  VENTUR1
 7/77
CHEMlcC
34 DIA X  51.'  HIGH
CAPBON STEEL
POLYFSTER  FLAKE6LASS
CARbON STEEL,  FLAKEGLASS
TANGENTIAL  FEED
   17.0
  201 .31
   5?.8
    f .0
    ?.D
   3C.5
  930
                         ACFM)
                <   127  F)
                (19*00  GP")
                (  45.0  6AL/100DACF)
                (  £.0  IN-H20)
                dfO.O  FT/S)
 6
I .0.
HOUSING-RUBBER  LINED  C.S.; BLADES  INCONEl
WET
  ** MIST ELIMINATOR
      KUMPER
      TYPE
      CONSTRUCTION MATERIAL
      CQNF IGURATION
      NUMFER Of  STAGES
      NUMPER OF  PASSES
      VANF SPACING -  CM
      VANE ANGLES
      yASH SYSTEM
      SUPERFICIAL 6AS VELOCITY - M/S
      PRESSURE  DROP - KPA

  ** MIST ELIMINATOR
      NUMBER
      TYPE
      CONSTRUCTION MATERIAL
      CONFIGURATION
      NUMP.ER OF  STAGES
      NUMF:ER OF  PASSES
      VANE SPACING -  CM
      VANF ANGLES
      WASH SYSTEM
      SUPERFICIAL 6AS VELOCITY - M/S
      PRESSURE  DROP - KPA

  ** PROCESS CONTROL  CHFNJETkY
      CONTROL VARIAPLTl
      CONTROL RANGE
      CONTROL MANNER
      MODE
      SENSOR LOCATION

  ** PUMPS
      SERVICE
      SCRUBPER RECYCLE
      SCRUBBER RECYCLE  (SPARE)
      LIME SLURRY TRANSFER
      ******
      ABSORBER RECYCLE
      ABSORBER RECYCLE  (SPARt'
      THICKENER UNDERFLOW TO MIX TANK
      THICKENER TRANSFER
CHEVRON-ABSORBER
FRP
HORIZONTAL  (2-SHAPE)
    1
    4
    7.6         (  3.00 IN>
90 DtG.
OVERSPRAY/UNDERSPRAY, ONE/SHIFT FOR  OVtRSPRAY, C
   3P.5         (100.C FT/S)
      .1         C   .3  1N-H20)
CHEVRON-SCRUBBER
FRP
HORI70NTAL  C2-SHAPE)
    1
    4
    7.6         < 3.00 JN)
90 DEG.
OVFRSPRAY/UNDERSPRAY, ONCE/SHIFT  FOR OVfRSPRAY,
   30.5         (100.P FT/S)
      .1         (  .J IN-H20)
PH SLURRY  SOLlDSt Ll«UJD LEVEL,  LIOUIO FLOW
PH 6.8-7.2
AUTOMATIC
FEEDBACK
PH-RECIRCULAT1N6 LINES AND THICKENER
                                                   NUMBER
                                                  274

-------
                                             EPA  UmiTY C6fl SURVEY! BltfWBiR 1978 • JANUARY 1979
                                           SECTION  3
                   DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL FfiD SYSTEMS
** TANKS
    SERVICE
    THICKENER UNDERFLOW
    MIXING TANK ICALCUOX & THCKNR  UND
    SLUDGE TRANSFER
    HIKING TANK [SPENT SLUfcRY  &  FLYASH ,
    RECYCLE  (SCRUPBER)
    RECYCLE  (ABSORBER)

** RIHfcATER
    TYPE
    TEMPfRATURfc ROOST - C
    ENER6Y
         NUMBFR

         *»**
            2
         ****
         ****
            6
            6
         BISECT COHIUSTION
            2?,2         (
         28 BTU/H
                   40 F>
 ** THICKINEP
    NUMBER
    TtPf
    CONSTRUCTION MATERIAL
    DIAMETER - 1
    OUTLET SOLIDS -  X

 ** WATER LOOP
    TYPE

 ** REA6ENT PREPARATION  EQUIPMENT
    NUMPER OF  SLAKgRS
    SLAKER CAPACITY  -  M T/K

 ** TREATMENT
    TYpF
    SUPPLIER
    CONTRACTOR
    PRODUCT  CHARACTERISTICS

 •* DISPOSAL
    NATURE
    TYpr
    LOCATION
    TRANSPORTATION
    AREA - ACRES
    CAPACITY -  CU.M
 1
RAKE
CARSON STEFL
   61.0
   30.0
              2
              2.0
                         «200  FT)
                                Tf-H)
         CALCILOX
         PROPRIETARY
         DRAVO
         CONSISTENCY  OF  6R«NULAR  SOIL
          FINAL
          LAMDFILL
          OFF-SITE
          PIPE
           1*00.0
           599270QOO     («
-------
    UTILITY f6D SURVFY: DECEMBER  1°7f  - JANUARY 1979

                                            SECTION 3
                    DESIGN  AND  FERFORMAKCE  DATA FOR OPERATIONAL F6D SYSTFMS
	PtRFORMANCF: DATA	'	"	•
PERIOD MODULF AVA1LAPJLITY  CFERABIUTY  rf'LIABUITY UTILIZATION  X REMOVAL    PER  BOILER  FGD   CAP.
                                                                 S02   PART.  HOURS HOURS  HOURS FACTOR

                          REPAIRS  UtRE  MOF  TO THE ZP F|.UE STACK BECAUSE OF  THE PREMATURE FAILURE OF
                          SEVERAL  TtST  MTCHES.
              AFFECTED MOHUltS:  2y
11/77
       *« PRObLEMS/SOLUTlONS/CONMENTS
             START  DATE   10777      LCUIFhENT:  60KER-RELATF D
             END DATf     10/77      PPOBlEfll NOT DEFINED/SPECIFIED
                           TK  UNIT  TSlPfED  DUE TO FAULTY 6FNERATOR CONTROL  TRANS'ORHERSc
             AFFECTED MODULES:  SYSTEK
        2B
        2C
        ?D
        PE
        ?F
        SYSTEM
     100.0
      96.0
      66.0
      *7.0
      55.0
      47.0
100.0
100.0
 92.0
 57.0
 53.0
6?. n
81. n
74.0
46.0
4?.P
J4.0
                                                                 730   5«1
       «* PROaLENS/SOLUTlONS/COMMENTS
              START  DATE   11/77      £CUI M1ENT: BOI Lf R-RELATE C
END DATE
                          11/77
                                    f-RCPlfW: NOT DEFINED/SPECIFIED
                                    ASSOCIATED  WITH THE STATION POytR TRANSFORMERS  CAUSED LIMITATION
                           IK  LOAD  Oh UNIT  2. THREE OF THE SIX STATION POWER TRANSFORMERS FOR UNIT ?
                           UtRE  DESTROYED
              AFFECTED  MODULES:  SYSTEM
12/77
        76
        ?F
        SYSTEM
      74.0
      99.0
      98.0
     100.0
      89.0
      99.0
 77.0
100.0
100.0
100.0
 65.0
 93.0
86.0
83. P
£6.0
69.0
76.0
                                                                               744    607
          PROBLEMS/SOLUTIONS/COMMENTS
              ST*RT  KATE   1Z/77      tOUItMENTs PIPIN6
              «ND  DATE:     12/77      FPOPUM: NOT DEFINED/SPFCIFIED
                           CCLD  UEATNfK CAUSED SOME PROBLEMS IN PROCESS PIPING.
              AFFECTtD  MODULES:  SYSTtf
  1/7E
        ?A
        ?D
        ?E
        ?F
        SYSTEM
      95.0
     100.0
      96.0
      94.0
      99.0
      99.0
 58.0
100.0
 56.0
100.0
100.0
 96.0
31.0
76.0
Z9.0
70.0
64.0
50.0
                                                                               744   391
       *« PR06LEMS/SOLUTIONS/CCMMENTS
              START  DATE    1/78      tOUIIWENT:  BOILFR-RELATE D
              END  DATE      1/78      PKOBliM: NOT DEFINED/SPECIFIED
                           T*t  UNIT  TR1PI1D SEVERAL TIMES DOE TO DIFFICULTIES  IN BURNING WET STOCK-
                           PILE  COAL.  WHTN  THE  UNIT WAS ON LINE  DURING  THIS  MONTH,  THE MET COAL ALSO
                           PREVENTED  FULL LOAD  OPERATION OF COAL MILLS.
              AFFECTED MODULES:
       ** PROBLEMS/SOLUTIONS/COMMENTS
             START DATE    1/76      ECUIfMENT:  BOILER-RELATED
             END DATE      1 /7£      PROPtE«: NOT DEFINED/SPECIFIED
                           BOILER  CONTROL VALVE ("W" V*LVE> PROBLEMS  COMPO^NtEO $T*R T~UP 61 FF1 CWLTIES
 2/7P
        2A
        ?C
        ?C
        20
      64.0
      87.0
      89.0
      97.0
 46.C
 6R.O
 88.0
 71.0
48.0
66.0
88.0
71.0
                                                276

-------
                                              tPA UTILITY  FGD  SURVEY:  DECEMBER 1978 - JANUARY  1979
                                            SECTION 3
                    DESIGN  AND  PERFOPMAhCE DATA FOR OPERATIONAL FGD SYSTEMS
	PERFORMANCE  DATA	
PERIOD MODULE AVAILABILITY  CPERABU1TY DELIABI LIT Y UTILIZATION
                                                          *  REMOVAL   PER  BOILER  FED   CAP.
                                                          S02  PART. HOURS HOURS  HOURS FACTOR
2E
2F
SYSTEM
99.0
78.0

99.0
78.0

99.0
78.0



672


672
       ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    2/78     E.6UI PMENT:  FAN
              END  DATE      2/78     PfOBUM: NOT  DE FINED/S PFC1F I ED
                           M/iNY PROBLEMS OCCURRED  WITH  I.D. FAN COOLERS DUE TO INCLEMENT WEATHER.
              AFFECTED  MODULES: SYSTIM

       ** PROBLEWS/SOLUTIONS/COKMEN1S
              START  DATE    3/78     t«UI IflENT:  BOILER-RELATED
              END  *ATE      3/7E     F-ROP (.<:*•« NOT  D E FINtD/SPE CI F I fcrO
                           A BOILER TUBE LEAK  CAUSED  SEVERAL DAYS' OUTAGE.
              AFFECTED  MODULES: SYSTIM
  3/78    ?A
         2B
         2C
         ?D
         2E
         ?F
        SYSTEM
           100.0
            97.0
            1^.0
            95.0
            95.0
            97.0
            100.0
             91.0
             10.0
            1CO.O
             96.0
             99.0
                        67. tl
                        60. 0
                        13.0
                        68.0
                        64.0
                        65.0
                                                                       744   494
  4/78
        *«  PROfaLEMS/SOLUTIONS/COMMENIS
              START DATE   3/78      E6UIIMENT:  FAN
              tND DATE     3/78      PPOP.LrM:  NOT DEFINED/SPECIFIED
                           [XTENS1VE  I.D.  FAN HOUSING REPAIRS WERE PERFORMED ON  THE  2C  FAN.
              AFFECTED MODUltS:  2C
 2A
 2B
 ?C
 ?D
 2E
 2F
SYSTEM
100.0
100.0
 59.0
 15.0
 H.O
 17.0
82.0
82.0
59.0
15.0
14.0
13.0
£1 .0
81.0
59.0
15.0
14.0
13.C
                                                                                720    713
        t* PROBLEMS/SOLUTION S./CCKMENU
              START DATE    4/7R      tOUIt'MENT: STACK
              LND DATE      4/7f      F'ROPUM: CHEMICAL-RELATED EROSION
                            ChlMNFY  FLUE  L1NINING REPAIRS ON  2H  APRIL  5.
              AFFiCTED MODULES:  2R

        ** PROBLEMS/SOLUTIONS/COHMENTS
              START DATE    4/78      F6DI t^ENT: FAN
              END DATE      4/78      PFOPltR: NOT D E F IK' ED/SPS CI F I tD
                            EXTENSIVE REP*IRS WERE MADE ON THt 2C  I.D.  FAN,  CAUSING  IT TO BE  DOWN FROM
                            MARCH A  THPOIHH APRIL 13.
              AFFECTED MODULES:  2C

        ** PRObLEMS/SOLUTIONS/COMMENTS
              START DATE    5/78      tOUIIKENT: STACK
              END DATE      5/7B      PROBI.KM: CHEMICAL-RELATED EROSION
                            21  STACK LiNjw. REPAIRS CONTINUED.
              AFFECTED MODULES:  ?B
  5/7P   2A
         ?B
         ?C
         ?D
         2E
         2F
        SYSTEM
           100.0
           100.0
           100.0
             100.0
             100.0
             100.0
                         37. P
                         37.0
                         37. f!
                                                                        744   270
        ** PRO&LEMS/SOLUTIONS/COMMENTS
              START DATE    5/78      EClllI F'f ENT: FAN
              END DATE      5/78      PRORIFM: NOT DEFINED/SPECIFI ED
                                                 277

-------
fP» UTILITY  FbP  SUFVfY:  D£C£Mnif> ic?j  . JANUARY 1?79
                                            SECTION  I
                     OfSlt-N  AND PERF OfidAtvCE DATA FOR OPERATIONAL FGO SYSTEMS
		.„	--PEftFORMANCf  DATA- — -	"	'	
PERIOD  MODULf  AUAILAHHITY CPERA&H11Y  '(LIABILITY UTILIZATION  X REMOVAL   PER   BOILER   FGD   CAT.
                                                                  SOJ  PART. HOURS  HOURS  HOURS FACTOR
»"•«»«•  *»•><•»*  •>••*•••••!•••>• • •»»*«••«»«*•  4,»w«H.w»«<»a>« WM«WW»*>MM*>M i»»t m mm •• — •*" •.••••*  •»•< •— •»•  —*••« • ••»•••
                           Ur t'MT fcAS  ifF-LINf FOR 7  WEEKS FOR REPAIRS TO THE  2C  I.D. MN, 1NCLUD-
                           INC. COVERIN6  1HE HOUSING WITH  jNCOtOY 825.
              AFFECTED  MODULES: 2C

         2A          70.o       100.0                    rc.o
         2B          69.0       100.0                    69.0
         ?C          66.0       100.0                    66.0

         n

        SYSTEM                                                                  720    417

        •• PROBlifS/SOLUTIONS/COMMENTS
              START  DATE   H7f     (SUHHiNTt  STACK
              END D»TE      «/7!i     FROfiUM: C HtMl C AL-RF,LATr D EROSION
                           2i: STACK LIMM: REPAIRS CONTINUED.
              AfFFCTED  MODULES: ?R

        *» PROtatCS/SOLiniONS/COMMf Nl £
              START  DATE   6/7K     EUUirrENT:  F6D SYSTEM,  GENERAL
              END DATC      6/78     COHMlNTSs
                           *NOTf: AN ATTIMPT IS ALWAYS  MADE  10 BEGIN OPERATION Of  THE BOILER AND  F6D
                                  SYSTEM SIMULTANEOUSLY AT  PKUCE MANSFIELD. OCCASIONALLY  PROBLEMS
                                  DELAY  1'OILtR  START-UP,  MAKING IT POSSIBLE FOR MONTHLY F6D  MODULE
                                  HOURS  10 F.XCFED ACTUAL  BOILER HOURS.
              AFFECTED  MODULES: SYSTEM



                                                                               744

                                                                               720

                                                                               744

                                                                               7?U

                                                                               744

        • • PROPLEMS/SOLUTIONS/COMHENU
              START  DATE  12/7J!     16UI FHENT:  FGD SYSTEM,  6ENERAL
              END DATE      1 IT)     CCKf (NTS:
                           NC INfORMATIO* WAS AVAILABLE FOR  THIS PERIOD.
              AFFECTED  MOtlULkS; SYS*

  1/79   SYSTEM                                                                  744
7/78
8/7F
9/7P
10/78
11/7f
12/78
SYSTEM
SYSTfK
SYSTEM
SYSTEM
SYSTEM
SYSTEM
                                                278

-------
                                             EPA UTILITY  F6D SURVEY: DECFNBER 1978 - JANUARY  1979
                                           SECTION  3
                    DESIGN  AND PERFORMAKCE DATA FOR OPERATIONAL FGD SYSTEMS
COMPANY NAHf
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY  CLASSIFICATION
PARTICULATE  EMISSION  LIMITATION - KG/J
S<32 EMISSION LIMITATION - NG/J
NET PL*NT GENERATING  CAPACITY - nw
6ROSS UNIT  GENERATING CAPACITY - flk
NET UNIT GENERATING CAPACITY V/FGD - «V.
NFT UNIT GENERATING CAPACITY WC/FGC -  i*H
E6UIVALFNT  SCRUBBED CAPACITY - l»«

** BQILFR  DATA
    SUpPLItR
    TYPF
    SERVICE LOAD
    COMMERCIAL  SERVICE DATE
    HA-XIfUM BOILER FLUE GAS  FLOW - Ctl.*/5
     FLUF.  6AS TEMPF.RATURF. -  C
     STACK  HEIGHT - »
     STACK  TOP  DIAMETER - K

 **  FUEL DATA
     FUEL  TYPE
     FUEL  GRADE
     AVERA6F HEAT CONTENT -  KJ/KG
     RANGE  HEAT  CONTENT - &TU/LE
     AVERAGE ASH CONTENT  -  %
     RANGE  ASH CONTENT  -  X
     AVERAGE MOISTURE CONTENT - X
     RANGE  MOISTURE CONTENT  - K
     AVERAGE SULFUR CONTENT  - X
     RANGE  SULFUR CONTENT -  X
     AVERAGE CHLORIDE CONTENT - X
     RANGE  CHLORIDE CONTENT  - X
     FUEL  FIRING RATE - H T/H
     FUEL FIRING RATE - NW

 ** PARTICULATE SCRUBBER
     NUMF-ER
     TYPE
     SUPPLIER
     NUMF-ER OF  STAGES
     SHELL MATERIAL
     BOILER LOAD/SCRIJCBER -  X

 •* F6D SVS1EK
     SALEABLE PRO OUCT/T HR OK AWA Y  PRODUCT
     GENERAL PROCESS  TYPE
     PROCESS TYPE
     SYSTEM  SUPPLIER
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     PARTICULATE DESIGN  REMOVAL  EFFICIENCY
     S02 DESIGN  REMOVAL  EFFICIENCY  - X
     COMMERCIAL  DATE
     INITIAL STAPT-UP

 ** ABSORBER
     MUMPER
     TYPE
     INITIAL START  W
     SUPPLIER
     NUMPER  OF  STAGES
     BOILER  LOAD/APSORPEP - t
     GAS FLOW -  CU.M/S
     LlflUID  RECIRCIJLATION RATE -  LITER/S
     L/G RATIO  - L/CU.M
     PRESSURE DROP  -  KPA

 ** REHEATER
     TYPF
PHILADELPHIA  ELECTRIC
EDOYETONE
1A
EDDYSTONE
PENNSYLVANIA
G
******
******
 1395.0
  120.0
  130.0
* ******
  120.0
******
******
BASE
**/**
*********
   157.2
(****** LB/MMBTU)
(****** LR/HMBTUJ
COAL
******
  31634.

    9.40
******
    5.90
******
    ?.60
<-»****»*
< 315 F)
(**** FT)
(***** FT)
( 13600 BTU/LB)
 ******
 ***** ***
 ******
 *******
 *****
 VENTRI-ROD
 tNV]PONEfRING
     1
 316L SS
    25.0
 SALEABLE PRflDUCT
 WET SCRUBBING
 MAGNFSIUM OXIDE
 UNITED ENGINEERS
 DEMONSTRATION
 RETROFIT
    99.00
    90.00
  9/75
  9/75
 VENTPI-ROD
  9/75
 ENV1RONEE-RING
<*** TPH)
    3T.3
   126.47
   F43.
     ft. 5
     2.5
 <  268COO  ACF«>
 (13384  GP«O
 (  48.5  GAL/1000ACF)
 (1C.O  1.N-H20J
                                                  DIRECT  COMPUSTlON
                                                 279

-------
EPA UTILITY FGD SURVEY:  DECEPBEI- 1971 - JANUARY 1979
                                            SECTION 3
                     DEJlfcN  AND PER FORMATE DATA F00 OPERATIONAL  F6D SYSTEMS
** WATER LOOP
    TYpf
    FRESH MAKEUP WATER

** BYPRODUCTS
    BYPRODUCT N*TUF  CIL.

                               THERE ARE TUO FURNACES  ON THf NO. 1  BOILER. EACH FURNACE WAS INSTALLED
                           WITH PARTICIPATE CONTROLS CONSISTING OF  MECHANICAL COLLECTORS AND  AN
                           ELECTROSTATIC PRECIPITATOR.

                               THF MAGNESIUM OXIDE-BASED FLUE GAS DESULFURIZATION  (FGD) SYSTEM  ON
                           8CILEP NO. 1  fT THE  EDDYSTONE STATION OF PHILADELPHIA ELECTRIC  CO. (PECO)
                           WAS DESIGNED  'ND INSTALLED  BY UNITED ENGINEERS AND CONSTRUCTORS, INC.,  IN
                           CC-OPERATION  UTH PHILADELPHIA  ELECTRIC. THE SYSTEM CONSISTS OF THREE
                           FIRST-STAGE SCRUBBER MODULES  IN  PARALLEL FOR PARTICULATE  CONTROL (TWO
                           EKVIPONEEtiING VENTRI-ROD SYSTEMS  AND ONE PF ABOD Y-LURG1  VENTURI  UNIT) AND A
                           SECOND-STAGE  INVI RONEERING  AtSOKFtR  MODULE WITH TWO VENTRI-ROD  BEDS  FOR
                           SLLFUR DIOlDr REMOVAL.

                               THE THREE FIRST-STAGE  SCRUBBERS ARE  SIZED TO HANDLE ALL  THE EXHAUST
                           FROM UNIT 1 UHCH HAS A  WET  GENERATING CAPACITY OF 316  MW .  THE  SECOND-STAG
                           AtSORBER  IS S12ED TO HANDLE  ONE-THIRD OF THE GAS FLOW EQUIVALENT TO
                           APPROXIMATELY 105 MW (NET).  THE  SYSTEM IS DESIGNED TO REMOVE 90 PERCENT OF
                           The SULFUR D10IDE FROM  BOILER  STACK GAS. A GENERAL PROCESS  FLOW DIAGRAM
                           OF THE WET SCABBING SYSTEM  IS  PRESENTED IN APPENDIX 6.

                           SCRUF6ER  OPERATING HISTORY

                               THERE kAS A BRIEF OPERATING  PERIOD ON THE PARTICULATE SCRUBBERS  FROM
                           MlD-NOVEMbfR, 1974 TO MARCH,  1975, THAT  UNCOVERED A NUMBER  OF PROBLEM
                           A*EAS. DUE TO A NUMBER  OF  EXTENUATING CIRCUMSTANCES, PARTICULATE SCRUBBING
                           WAS NOT RESTATED UNTIL  JULY 23,  1975, WITH ONE PARTICULATF  SCRUBBING TRAI
                           FCLLOWED  EY TH OTHER TWO  TRAINS, on AUGUST 15 AND OCTOBER  2, RESPECTIVELY
                           THE SULFUR DlCXlDE ABSORBER  WAS  ST*RTED  FOR THE FIRST TIME  ON OCTOBER E,
                           1975. AND THE MAGNESIUM  OXIDE REGENERATION  fACILjTY FIRST pRQDUCED MAGNE-
                           SIUM SULFITE  ft-OM THE EDDYSTONE  SCRUBBER ON OCTOBER 28t 1975.

                               THE MAGNESIUM OXIDE  REGNERATICN FACILITY HAS BEEN OPERATED  TO PROCESS
                           ALL MAGNESIUM SULFITE DOWNS  AT  THE EDDYSTONE SCRUBBER.

                               THE SULFU* DIOXIDE  SCRUBBING SYSTEM WAS TEMPORARILY SHOT DOWN DECEMBER
                           31, 1975, BECAUSE THE ACID  PLANT REGENERATION  FACILITY  AT  THE OLIN  CHEMICA
                           SLLFURlC  ACID PLANT  IN  PAULSEORO, NEW JERSEY PERMANENTLY  CEASED OPERATIONS
                           TfcE ACID  FLAN! REGENERATION FACILITY WAS RELOCATED TO THE ESSEX CHEMICAL
                           PLANT IN  NfWAktr, NEW JERSEY.

                               THE PARTICULATE  AND  SULFURE DIOXIDE SCRUBBING  SYSTEM  INSTALLED  ON THE
                                                 280

-------
                                              EPA  UTILITt FGD SURVEY: OECtHSItR 1978  -  JANUARY  1979
                                            SECTION  3
                    DESIGN  AND PERFORMANCE DATA FOR OPERATIONAL F6D SYSTEMS
... --- .......... — ...... — ................p£Rf ORMANCE  DATA ----- • ------------------ • ---------- - --------
PERIOD MODULE AVAILABILITY OPERABU1TY  t-fLlKB I L1TY  UTILIZATION  X REMOVAL   PER  BOILER   F6D    CAP.
                                                                  S02  PART. HOURS HOURS   HOURS  FACTOR

                           E6DYSTONE NO . 1 UNIT  IS  THf  FIRST pHAsE OF A TWO-PHASE PROJECT.  FOLLOWIN6
                           SICCFSSFUL Of VRLOP6MTN  OF THIS SYSTEM WITH MORE CONTINUOUS  OPERATION, IT
                           KILL BE INCORPORATED  INTO THE DESI&N FOR THE COMPLETE SULFUR  DIOXIDE
                           REMOVAL OK tOl'YSTONC  NO.  2 AND ONE OF THE TWO EXISTING UNITS  AT  THf  CROMBY
                           STATION.

                               ADDITIONAL  INFORMATION AND DAI* CONCERNING THE  OPERATION  OF  THE  PAR-
                           T1CULATE AND  t-HLFUR  D10XIDP  SCRUfBERS INSTALLED AT  THIS  PLANT  ARF PROVIDED
                           IK THE PERFORMANCE  TABLE  THAT FOLLOWS.
              AFFECTED MODULES: SYSTEM

 11/74   SYSTEM                                                                   720

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   11/74     tOUI FWENT:  F6D SYSTEM, GENERAL
              END  DATE     6/75     COMMENTS:  RESEARCH  AND DEVELOPMENT
                           THE SCRUBBING  SYSTEM AT THIS PLANT CONSISTS OF THREE  PARALLEL  SCRUBBING
                           TRAINS INCORP (RATING 3  WET PARTICIPATE  SCRUBBERS AND  ONE S02  ABSORBER
                           MODULE. ThERF  WAS A  BRIEF OPERATING PERIOD ON THE PARTICULATE  SCRUBBERS
                           FROM MID-KCVEftiER 1974  TO MARCH 1975. PROBLEMS ENCOUNTERED  CENTERED  AROUND
                           It,! SCRUBEiEfc iCOSTEfi FANS AND THE FLUE  GAS AND LIQUID CONDITIONS. THE
                           B-SIDE BOOSTE S FAN  DEVELOPED HlfiH SHAFT VIBRATION WHEN STARTED FOR  THE
                           FIRST TIME.  THIS  PROBLEM WAS DESIGN RELATED. INVOLVING AN  EXCESSIVE  CLEAR-
                           ANCE AREA BlTv-fEN THE SHAFT  AND WHEEL UB. ALSO, EXTENSIVE  CORROSION
                           DEVELOPED  IN 1H E  C-S1DE PARTICULATE SCRUBBER INTERNALS.  THIS  WAS CAUSED  BY
                           LCW SCRUBBING  SOLUTION  PH LEVELS  AND CHLORIDE LEVELS  AS  HIGH  AS  2000  PPM.
                           THESE CONtjlTICNE  COUPLED WITH THE THERMAL SHOCK OF  A  HOT START PROCEDURE
                           CAUSED THt  COHOOSION. THIS PROEfLFK WAS  AMELIORATED  BY CAUSTIC  ADDITION,
                           HIGHER BtOHOOMJ  AND EMPLOYING A COLD START PROCEDURE. AT APPROXIMATELY TH1
                           TIME, A ChECKCl'T  Of  SOJ SYSTEM WAS CONDUCTED, BLISTERING AND  PEELING  OF  TH
                           pOLYyRETHAMt COATINGS WERE DETECTED  AND CORRECTED PY  RECOATING WITH  FLAKE-
                           GLASS.
              AFFECTED MODULbS: SYSTtK
 12/74  SYSTEM                                                                  74*

  1/75  SYSTEM                                                                  7*«

  2/75  SYSTtM                                                                  672

  3/7!  SYSTFM                                                                  ?**

  4/75  SYSTEM                                                                  720

  5/75  SYSTEM                                                                  74<-

  6/75  SYSTEM                                                                  720

  7/75  SYSTIH                                                                  744

        ** PROHLEMS/SOLUT10NS/COMMENTE
              START  DATE    7/75     tOUIFHENT:  FGD SYSTEM,  GENERAL
              END DATE      1/76     COdftNTS: RESEARCH  AND  DEVELOPMENT
                            THE  C-SIDE PA l-TjCULATE SCRUBOER  RESTARTED ON JULY 23, 1975. THE 7VIO REMAIN
                            JMi  TRINS, H-'.IDE AMD A-SIDE, WERE  PUT INTO  OPERATION ON AUGUST 1s AND
                            OCTOBER ?, RE M^ECTIVELY. THE SC2 ABSORBER MODULE IN THF; C-SIDE SCRUBBING
                            ThAIN WAS 1KI1IALLY  PLACED  IN SERVICE  OCTOEER 2, 1975. THE OLIN CHEMICAL
                            MCO  REGENERATION FACILITY  FIRST  PROCESSED MAGNESIUM SULFITE FROM THE EDOY-
                            STONF SCRUFPEI ON OCTOBER  2», 1975. THE  C-SIDE PARTICULATE SCRUBBER OPERA-
                            TED  A TOTAL 0* 2*31  HOURS  THROUGH  JANUARY ?1, 1976, FOR AN AVA1LABUTY OF
                            7t PERCENT. THJ Cf-SIDE TRAIN HAS OPERATED A  TOTAL OF  19J3 HOURS THROUGH
                            JANUARY 71, 1 ,76 FOR AN AVAILABILITY OF  55 PERCENT. THE A-SIDE TRAjK OPERA
                            TtO  A TOTAL Of 626 HOURS THROUGH JANUARY 31, 1976, FOR AN AVAILABILITY OF
                            24 PERCENT THC C-SIDE 502  ABSORBER WAS IN SERVICE A TOTAL PF  556 HOURS
                            THROUCH OECtfifR 31, 197  ,  WITH  AN AVAILABILITY OF 33 PERCENT  SINCE START
                            UF'.  PROBLEMS ^'COUNTERED IN  THE  OPERATION OF THE THREE SCRUBBING TRAINS
                            INCLUDED: tlNDff-DESISNED RECI RcUL ATI ON PUMPS, MALFUNCTION OF  THE FLUF 6AS
                                                  281

-------
fPA UTILITY  FtD  SURVFY:  DECtMPER 197f - JANUARY  19?9
                                             SE CTJON  3
                     DESIGN AND PFRFOFMKE  DATA  FOR OPERATIONAL FGD SYSTFMS
---- ______________________________________ PERFORMANCE  DATA ------------------------------------------
PERIOD  MODULE  AVAILABILITY OPE«tAf>JLlTY  i£LIAf>UITY  UTILIZATION  X REMOVAL   PER   BOILER  F 6 D   CAP.
                                                                  S02  PART.  HOURS  HOURS  HOURS  FACTOR

                           f Y-PAS! DAMPFl DRIVf UNjTS  AM)  FAILURE OF THE DOUBLE-BRICK REFRACTORY.
                           LINING IH THE PEHtAT COMBUSTION  CHAMBER.
              AFFECTED MODULES: SYSTfcM

  B/73   SYSTEM                                                                   744

  9/75   SYSTEM                                                                   720

10/7S   SYSTEM                                                                   744

11/75   SYSTfM                                                                   7?0

12/7!   SYSTEM                                                                   744

  1/76   SYSTIM                                                                   744

  2/76   SYSTEM                                                                   696

        **  PROBLEMS/SOLUTION S/COMHENTf
              START DATE   ? /76      rOUIITENT*  F6D  SYSTEM,  GENERAL
              END DATE     5/76      COMMITS!  RESEARCH  AND  DEVELOPMENT
                           OPERATION or  THE  so? SCRUBBING  SYSTEM AT EDDYSTONE  WAS  TFHPORARILY HALTED
                           FitCAUSF THE A(]D  PLANT  RFCK NF RA T I CN FACILITY AT THE  OLlN  CHEMICAL SULFURTC
                           ACID PLANT  IN FAULSF'ORC,  NEW JFRSEY PERMANENTLY CEASED  OPERATIONS* THf
                           UTILITY IS  NO l, INVESTIGATING ALTERNATIVE HF 6ENE R ATI ON SITES. A MINIMUM PER
                           ICD OF SIX  MOKTHS WILL  BE REQUIRED FOR RELOCATION ONCt  A  CHOICE IS MADE.
                           Tht UTILITY AKNOUNCEb PLANS  FOR  RELOCATION OF THE REGENERATION FACILITY AT
                           TKL ESSEX CHEMCAL  PLANT  IM  NEWARK, N tW JERSEY.
              AFFECTED MODULES:
  3/76  SYSTEM                                                                  7*4

  4/76  SYSTEM                                                                  7?0

  5/76  SYSTEM                                                                  744

  6/76  SYSTEM                                                                  7?G

        ** PROBLtMS/SOLUT! ONS/CCMMENTS
              START DATE   6/76      EGUIf-MENT:  FGD  SYSTEM, GENERAL
              END DATE     £/76      COMMFMTS:  RESEARCH AND DEVELOPMENT
                           RESUMPTION OF  SO? SCRUBBING OPERATIONS IS PRESENTLY  SCHEDULED FOR DECEMBER
                           1576.  THE RtLCtATlON  OF  THF REGENERATION FACILITY  IS NOW IN PROGRESS. THF.
                           PART1CULATF  SIRUBBERS ARE OPERATlCNAL. THE C-SIDE  eOOSTER FAN HAS DtVELOPE
                           A  MATERIALS  F'JLURE  BETWEEN THE HUB AND SHAFT  (IDENTICAL TO THE B-SIDE UNI
                           T  MENTIONS,!)  AfCVS).
              AFFECTED MODULES!  SYSTEM

  7/76  SYSTEM                                                                  ^^^

  8/76  SYSTEM                                                                  744

  9/76  SYSTEM                                                                  720

        ** PROBLEMS/SOLUTIONS/COBMENTS
              START DATE   9/76      ECUIFfENT:  FGD  SYSTEM, GENERAL
              END DATE    10/76      COMMENTS:  RESEARCH AND DEVELOPMENT
                           ALL THREE BOOSTER FANS HAVE NOW DEVELOPED THE  MATERIALS FAILURE FJETKFEN  TH
                           HIS AND  SHAFT  (AS IDENTIFIED IN THE ABOVE FOR  THE  B-SIDE UNIT). THESE UNIT
                           HAVE  E-EEN RETIRMED  TO THF MANUFACTURER FOR MODIFICATIONS AND REPAIRS.
                           CURRENTLY, ONI  OF THE PART1CULATE SCRUBBERS  IS lit  THE FLUE 6AS STREAM.
                           TC DATE,  ALL 1HREE  OF THE WET PARTUULATC SCRUBBERS HAVE NOT SEEN ANY
                           AFPRECIAEiLE  SIMULTANEOUS SERVICE TIME.
              AFFECTED MODULES:  SYSTEM

 10/76  SYSTEM                                                                  744

 11/74  SYSTEM                                                                  720



                                                 282

-------
                                              IPA  UTILITY  FGB SURVEY: DtCfMBiB 1978 - JANUARY 1979
                                            SECTION  3
                    DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL FCD SYSTEMS
......................................-.-~PfNFORMANC6  6 AT A	.......................................
PERIOD MODULE AVAIL ABILITY CPERABU1TY  PLIABILITY  UTILISATION  X REMOVAL    PER  BOILER  FSB   CAP.
                                                                 $02  PART. HOURS HOURS  HOURS FACTOR


       ** PSOkiLEMS/SOLUUONS/COMMINTS
             START BATE   11/74      leUlfWINT!  F6D  SYSTFM,  GfNERAL
             INC OATI     1?m      COMMtNTSs SISIARCH  AND  DiVELQPMINT
                          MJO SeRUBIINe OPERATIONS  ARi NOW SCHEDULED TO RESTART IN MAY 1977. RI6INIR
                          -ATION  FACILITY RELOCATION  IS PEIN6 COMPL|T|p, AND MODIFICATIONS TO THE ID
                          BOOSTER  FANS  CURRENTLY BFINd IFFfCTiD CONSIST OF CONVERSION FROM A SHRINK
                          FIT TO  A  4LIP FIT. THIS!  MODIFICATIONS ARE EXPECTiB TO ELIMINATE RECURRING
                          VIBRATION PROtLiMS,
             AFFECTED MODULES!  SYSTfcM

12/76  SYSTEM                                                                 74*

  1/77  SYSTEM                                                                 744

       ** PROaLEMS/SOLUTIONi/COMMENTS
             START DATE   1/77      IQUIIKENT:  FGD  SYSTEM,  GENERAL
             fcND BATE     1/77      COMMITS: NfSbARCH  AND  DEVELOPMENT
                          TK  ^AGNESIUW OXlOf  SCRURB1N6 SYSTEM AT EDDySTONE NO. IA IS STILL SCHEDULE
                           FCR  RESTART  lit MAY 1977. THE STftRT-UP OF THE NEW MGNESIUM jyLFITE RE6ENER
                          -ATIPN  FACILItT AT THE ESSFX CHEMICAL PLANT AT NEWARKi N.J. IS ALSO SCHED-
                          ULED  FOR MY  1°77. THE THREE PARALLEL VINTUfiJ SCRUBBERS CONTROLLING PARTIC
                          -ULATE  EMISSIONS ON  EDDYSTONE NO. 1 WENT BACK INTO SERVICE IN MARCH 1977-
             AFFECTED  MODULES:  SYSU*

  ?/77   SYSTEM                                                                 672

  3/77   SYSTEM                                                                 7«4

  4/77   SYSTEM                                                                 720

        **  PROBLEMS/SOLUTIONS/COKMEfnTS
              START DATE    4/77      ECUITMENT: FGO SYSTcMi GENERAL
              END DATE      5/77      CCHMNTS: RESEARCH  AND DEVELOPMENT
                           RESUMPTION OF MAGNESIUM OXIDE SCRUBBING OPERATIONS OCCURRED DURING THE
                           REPORT PEhlOD. THE UTILITY  REPORTED THAT SflZ SCRUBBING OPERATIONS WERE
                           NOT CONTINUOUS THROUGHOUT THE PERIOD. THE ABSORBER WAS IN SERVICE APPROXI-
                           MATELY 20e HOI"S DURING MAY. REGENERATION OPERATIONS AT THE ESSEX FACILITY
                           WERt  NOT CONDUTED DURIN6 THE PERIOD. PECO PLANS TO  INITIATE S02 RECOVERY
                           A*D MAGOX REGf.NERATlON OPERATIONS DURING THE MONTH OF JUNE. THE S02 MODULE
                           CCNTAINS TWO  AT'SORBER SECTIONS  }N SERIES  (EACH  SECTION CONSISTING OF AN
                           ADJUSTABLE; ROC DECK WITH UNDERSPR AYS).  ONLY ONE  OF THE ABSORBER SECTIONS  I
                           PE1NG USED FOf S02 REMOVAL.  SQ2 REMOVAL EFFICIENCY HAS NOT BEEN MEASURED.
                           MAGNESIUM OX I fit LOSSES IN THE SYSTEM  (ABSORBTION AND REGENERATION) ARE
                           ESTIMATED AT  10 PERCENT.
              AFFECTED  MODULES: SYSTEM

  5/77  SYSTEM                                                                 7**

  6/77  SYSTEM                                                                 7*D

        **  PROiaLtMS/SOLUTIONS/COMWtNTS
              START DATE    d/77     EOUIIMENT: F6D SYSTEM, GENERAL
              fcND D/>Tf      7/77     COMMtNTSs RESEARCH  AND DEVELOPMENT
                           FAILURE  Of MIKOR  ANCILLARY ESUIPMENT  CAUSED  SOME  SHUTDOWNS. LATER, THE
                           eCILTF ITSELF  WENT DOWN. OVER THIS  PERIOD  THE ROTARY VALVE  ON  THE  MAG.
                           SULFTTE  DRIER  DISCHARGE PLUGGED REPEATEDLY.  ALSO THE BELTS  ON  THE  MAH-OX.
                           PRESLAKER FAILED.
              AFFfCTED

  7/77  SYSTEM

  6/77  SYSTtM
        ** PSOBLEMS/SOLUTIONS/COMMENTS
              START DATE   P./77     tBUICKENT:  FGD  SYSTEM,  GENERAL
              END DATE    11/77     COMMINTS:  RESEARCH  AND  DEVELOPMENT

-------
EPA UTILITY FOD SURVTY;  DECfcf*6FR 197P - JANUARY 1979
                                            SECTION  3
                     DESIGN AND PERFORMANCE DATA FOR OPERATIONAL FCD SYSTFMS
					PERFORMANCE  DATA	•	"
PERIOD MODULE  AVAILABILITY CPERAFULITY PLIABILITY UTILIZATION   x REMOVAL   PER  BOILER   FBO   CAP.
                                                                  SO?  PART. HOURS HOURS  HOURS FACTOR

                           THE ROTARY V*LVE PROBLEM APPEARS  TO BE SOLVED. CUMULATIVE  AVAILABILITY
                           SINCE HAY IS fSTIMATED TO BE  ROUGHLY  33*. PECO REPORTED  131  HOURS Of
                           CONTINUOUS OPLRATION FOR THE  SCRUtBER AND THICKENER CENTRIFUGE DRYING
                           LOOP. DURH'b 1HE. REPORT PERIOD  THERE  HAVE BEEN CONTINUAL  PROBLEMS WITH
                           THE GLAND PACKING ON THE FGD  SYSTEM CIRCULATION PUMPS (STUFFING  BOX).
                           PECO HAS SJNCt CHANGED THE 6LAND  CONFIGURATION. THERE ALSO WAS A PROBLEM
                           WITH HI6H SCLK'S FORMATION IN THE  THICKENER. DURING THF  OCTOBER-NOVEMBER
                           PERIOD THESE kAS ONf RUN WHICH  LASTED APPROXIMATELY FIVE  DAYS.
                           ELAND PACKING PROBLEMS PERSISTED  AND  MECHANICAL SEALS ARE  BEING  CONSIDERED
                           AS PCSSIfat AITERNATIVES. EVEN  WITH HEAT TRACING THE SEAL  WATER  FROZE-UP
                           CAUSING ROTAMiTERS TO DURST.  HIGH  SOLIDS PROBLEM IN THE  THICKENER IS STIIL
                           A PROBLEM AREA.
              AFFECTED MODULES: SYSTtf

  9/77  SYSTEI*                                                                  720

10/77  SVSTEI"                                                                  744

11/77  SYSTff                                                                  720

12/77  SYSTEM                                                                  744

       **  PROBLEHS/SOLUTIONS/CCmMENTS
              START BATE  1?/77     [BUIFMENT:  FGD SYSTEM,  GENERAL
              END DATE     1/7P     COMMINTS: RESEARCH  AND  DEVELOPMENT
                           1H UNIT WENT DOWN DECEMBER  ?2  FOR A  TURBINE OVERHAUL. DURING  THE OUTAGE
                           MAINTENANCE AM MINOR MODIFICATIONS WILL BE MADE ON THE  SCRUBBERS. THE UNI
                           IS EXPECTED Tl BE BACK ON LINE  THE FIRST WEEK IN MARCH.  THE  AVAILABILITY
                           FACTOR FOR THL OCT,  NOV, AND  DEC  QUARTER WAS 4?X. DURING  THIS  PERIOD SOME
                           OF THE HEM RACING  FAILED AND  OTHER  PROBLEMS OCCURRED WHEN  LINES FROZE AT
                           THE ACID PLAN' CAUSING THE FACIU1V TO BE RUN INTERMITTENTLY.  THE GLAND
                           PACKING PROBLEMS  HAVE NOT YET  BEEN SOLVED AND MECHANICAL  SEALS  ARE STUL
                           BEING CONSIDE FED.
              AFFECTED MODULES: SYSTEM

  1/7F   SYSTEK                                                                 744

  2/7P   SYSTEM                                                                 672

        **  PROBLEMS/SOLUTIONS/COHMENTS
              START DATE   2/78     EOUIf^ENTi  FGD SYSTEM,  GENERAL
              END DATE     3/78     COMMt-NTS: RESEARCH  AND  0 tVELOPMENT
                           THE TURBINE OVERHAUL CONTINUED  DURING THE REPORT PERIOD.  DURING  THE SHUT-
                           DOWN PERIOD IT WAS FOUND THAT SOME HIGH PRESSURE STEAM TUBES WERE CRACKED,
                           SO UNIT MAINTINANCE  HAS TAKEN LONGER  THAN EXPECTED. SOME  MINOR FGD SYSTEM
                           MODIFICATIONS HAVE BEEN INCORPORATED  IN THE COURSE OF THE  SHUTDOWN PERIOD.
                           START UP IS EXPECTED IN MID-APRIL  78.
              AFffCTED MODULES: SYSTtM

  3/78   SYSTEM                                                                 744

  4/7P  SYSTEM                                                                 720

       *»  PROBLEMS/SOLUTIONS/CCMMENTS
              START DATE   4/78     EOUIfMENT:  FGD SYSTEM,  GENERAL
              END DATE     5/7£     COfifMNTS: RESEARCH  AND  DEVELOPMENT
                           TfcE UNIT CAME BACK 0N LINE JUNE  1  AFTER AN EXTENSIVE  SYSTEM MODIFICATION
                           OITAGE WHICH IEGAN DECEMPER  22.  THE UNIT WAS EXPECTED BACK ON LINE IN Ml»-
                           AFRll, BUT THtRE WAS A PROBLEM  WITH A SUPER PRESSURE  STEAM TURBINE.
              AFFECTED MODULES: SYSTt*

  5/7f   SYSTEM                                                                 744

  6/78  SYSTEM                                                                 720
        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/78     ESUIFKENT:  FGD  SYSTEM, GENERAL
              END DATE     7/78     COMMfNTS:  RESEARCH AND DEVELOPMENT
                                                 284

-------
                                              EPA UTILITY  f€0  SURVEY:  DECFMBER 1978 - JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PERFORHAtvCE DATA FOR OPERATIONAL F6D SYSTEMS
	PERFORMANCE  6 AT A	
PERIOD NODULE AVAILABILITY CPERARIL1TY  PLIABILITY  UTILIZATION  X REMOVAL   PER  SOILER  F6D    CAP.
                                                                  S02  PART. HOURS HOURS  HOURS  FACTOR

                           DIKING JUNE TH FGo  SYSTEM  ACHIEVED A 49Z OPERABILlTy. OPERA8ILITY FOR
                           JULY WAS 51*. PROBLEMS  OCCURRED  THE LAST WEEK OF JUNE WITH THE MGS03  $LuRR
                           CIRCULATION PIMP WHEN THE UTILITY DISCOVERED THE RUBBER LINER HAS TORN
                           AfcAY. THERE HIVE BEEN SOME  PROBLEMS WITH THE M60 SECTION WHERE THE M60
                           MIXES WITH THf.  SYSTEM LIQUOR.  FIRE BRICK WAS REMOVED  FROM THE FLUID  BED
                           REACTOR CHAMBCR TO  REPLACE  THE ACID BARRIER PLATES WHICH WERE FAILING.
                           THE FIRE fcRICK  WAS  THEN REPLACED. THE SLOW PIECE BY PIECE PROCEDURE  HAS
                           TIME. CONSUMING  AND  ACCOUNTED FOR MOST OF THE RpGENERABLE FACILTY  DOWN
                           TIME (MOST OF JUNE  AND  JULY).  MAJOR PROBLEMS WERE SOLVED ON THE REGENER-
                           ATIVE FACILITY  OVER  THE PERIOD REVOLTING IN IMPROVED  AVAILABILITY OF  THE
                           FACILITY.
              AFFECTED MODULES: SYSTEM

  7/78   SYSTEM                                                                 7*4

  B/7B    1A                      Zfi.O                     32.C
        SYSTEM                                                                 744   631

        **  PROHLEHS/SOLUT10NS/COMMENTS
              START DATE   8/78      ttUlfEMT: FGD SYSTEM, GENERAL
              tND DATE     8/7E      COMMINTS:  RESEARCH AND DEVELOPMENT
                           DURING  THE  NOMH  OF AUGUST  SCRUBBER  CIRCULATING  PIPING PROBLEMS WERE
                           tNCOUNTEREt.  t  BUTTERFLY CONTROL VALVE WAS NOT  FULL*  OpEN AND A SECTION
                           Of  PIPE  DOWNSTREAM  AT A $0 DEGREE  BEND ERODED  AWAY. TO CORRECT THE  PROBLEM
                           THE  BUTTERFLY VALVE WAS TAKEN OUT  AND REPLACED  WITH A RESTRICTION ORIFACE.
                           THE  CIRCULATICN PUMPING RATE WAS ALSO REDUCED.
              AFFECTED MODULES;  SYSTtK

  9/78   1.A                      78.0                    56.0
        SYSTEM                                                                 720    516

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   9/76      tCUIfWENT: FGD  SYSTEM,  GENERAL
              END DfTF     9/78     COMMtNTSs RESEARCH AND  DEVELOPMENT
                           THE  UTILITY REPORTED THAT NO MAJOR PROBLEMS  WERE ENCOUNTERED  DURING  THE
                           MONTH  OF  SEPTEMBER. CERTAIN MECHANICAL  PROBLEMS  WERE  RESOLVED  WHICH  CAUSED
                           Ah IMPROVEMtNl IN THE  OPERABILITY  FIGURE.
              AFFECTED MCpULtS: SYSTEM

  10/7S  A     '                  23.0
        SYSTEM                                                                  "**

        ** PfiOfDLEMS/SOLUTIONS/COMMENT!-
              START DATE   10/78     tOUIFPENT: REAGENT HANDLING
              END DATE     1?/78     PROBLEM: NOT  DEFINED/SPECIFI ED
                            THE F«D SYSTE* WAS SHUT  OO^N  FOR AN APPRECIABLE TIME  DURING THE  LAST
                            OUARTER OF 1978 DUE TO MODIFICATIONS TO  THE  »6
-------
!PA UTJUITT I6D SURVJYs  D!CS*fiER  1«7f - JANUARY 1979
                                            StCTION I
                     DiSl&N  ANO  NRFORMANfl DATA FOR rpl^ATICNAL  FED  SYSTEMS
 COMPANY NAMf
 PLANT NAMF
 UNIT NU"PFR
 CITY
 STATE
 REGULATORY  CLASSIFICATION
 PARTICULATF,  MISSION  LIMITATION - NUJ
 $02  IMISSICN  LIMITATION - K6/J
 NET  PLANT  CfNERAtlNS  CAPACITY - ««
 6POSS UNIT  CINIRATJNi CAPACITY - Mfc
 NET  UNIT 6F.NCRATIN6  CAPACITY W/F60 • Mv
 NET  UNIT 6eHRATlN6  CAPACITY VO/FCit > W
 EQUIVALENT  SCRUhfcFP  CAPACITY - MW

 ** BOILER  DATA
      SUPPLIER
      TYPE
      SERVICi LOAD
      COMMERCIAL  SERVICI [>ATt
      MAXIMUM 60ILtR FLUfc 6A5 FLOW - CU.C/S
      fLUF GAS  TE^PFRATURf - C
      STACK  HEIGHT  - «
      STACK  TOP DIAMETER - M

  **  FUEL  DATA
      FUiL TYPE
      FUEL GRADE
      AVERACr HEAT  CONTENT - KJ/KG
      RANFE  HEAT  CONTENT - BTU/LB
      AVERAGE ASH CONTENT - X
      RANGE  ASH CONTENT - X
      AVERAGE MOISTURE  CONTENT  - %
      RANGE  MOISTURE CONTENT -  *
      AVERAGE SULFUR CONTENT -  X
      RANGE  SULfUR  CONTENT - %
      AVERAGE CHLORIDE  CONTENT  - X
      RANGE  CHLORIDE CONTENT -  %
      FUEL  FIRING RATE - M T/H
      FUEL  FIRING RATE - f>U

  **  ESP
      TYPE
      PARTICUtATE DESIGN REMOVAL EFFICIENT  -  i

  «* PARTICULAR SCRUBBER
      NUflPER
      TYPE
      SUPPLIER
      SHELL MATERIAL
      LINING MATEPIAL
      FLUE 6AS CAPACITY  - CU.M/S
      FLUF GAS TEMPERATURE -  C
      LI fill ID lit CIRCULATION RATE - LITfS/J
      PRESSURE CROP - KPA

  ** F6D SYSTEM
      SALFAPLE PROOUCT/THRONAWAY PRODUCT
      GENERAL PROCESS TYPE
      PROCESS TYPE
      SYSTEM SUPPLIER
      DEVELOPMENT LEVEL
      NEW/RETPOF1T
      PARTKULATE DESIGN REMOVAL EFFICIFItCY  -  %
      SO 2 DESIGN REMOVAL EFFKIFNCY  -  *
      INITIAL START-UP
      CONSTRUCTION INITIATIOK

  ** ABSORBER
      TYPE
      INITIAL START UP
      SUPPLIER
      NUMBER OF STAGES
      SHELL MATERIAL
      BOILER LOAD/AFSORBER -  *
PUHL|C SIAVICE 6f NIW MEXICO
SAN JUAN
                   .050  LJ/MMPTU>
                   .3*0
NEW MIX1CO
e
*******
  161.0
  11*. 0
*******
  361.0
******
******
BASE
 0/76
  6Z2.44
  122.C
******
*******
COAL
« *****
 1F841.
******
   U.82
*******
     .SO
******
********
******
  181. A
*****
HOT SIDE
   99.S
 3
VENTURJ
DAVY  POUERGAS
CARBON  STEEL
ACID  BRICK
  257.2
  136.1
  224.9
    3.0
(1319000 ACF«>
(  253 F>
(**** FT)
(*****  FT)
(  8100 BTU/LB)
 ***** *
(200 TPH>
( 545000 ACFM)
t  277 F)
( 3570 6PM)
(   12 IN-H20)
SALEABLE  PRODUCT
WET  SCRUBBING
DAVY  POWERGAS
FULL-SCALE
RETROFIT
    99.50
    85.00
  4/7"
  1/76
 SPRAY  TOWER
  4/7ft
 DAVY po«£RsAS
     5
 CONCRETE  AN6 316 SS
    33.0
                                                 286

-------
                                            EPA UTILITY F6D SURVEY:  DECEMBER  1978  -  JANUARY  1979
                                          SECTION 3
                   DESIGN AND PERFORMANCE DATA FOR OPERATIONAL  FGD  SYSTEMS
GAS FLOW - CU.M/S
6AS TiUPERATURE - t
LIQUID RECIRCULATION RATE - LI1ER/S
PRESSURE DROP - KPA
SUPERF1CAL GAS VELOCITY - M/SEC
PARTICULAR INLET LOAD - C-/CU.M
PARTICIPATE REMOVAL EFFICIENCY - X
S02 INLET CONCENTRAT10H - PPM
S02 OUTLET CONTRATION - PPM
SOZ DESIGN REMOVAL EFFICIENCY - X
207.16
46.9
47.
4.0
3.3
.1
75.0
700
70
90.0
439000 ACFM)
120 F>
750 GPn>
16.0 IN-H20)
10.8 FT/S)
.053 GR/SCF)




** ABSORBER
    NUMBER
    TYPE
    INITIAL START UP
    SUPPLIER
    NUMBER OF STAGES
    SHELL MATERIAL
    BOILER LOAD/ABSORBER - X
    GAS FLO* - CU.M/S
    6AS TfftPERATURE - C
    LIQUID RECIRCULATION RATE  •  LITEP/!
    PRESSURE DROP - KPA
    SUPERFKAL CAS VELOCITY -  M/SEC
    PARTICULATE INLIT LOAD * G/CU.f
    PARTICULATE REMOVAL  EFflCIENCV  -  X
    802 INLET CONCENTRATIOfc -  PPM
    SOZ OUTLET CONTRATION  - PPM
    SOa DESIbN REMOVAL EFFICIENCY  - X

 **  FANS
    TYpf

 *«  PUMPS
    SERVICE
     SLURRY PUMP
     VENTURI  RECIRCULATION

 **  ftEHEATFR
     TYpf
     HEATING  MEDIUM
     TEMPERATURE.  BOOST  - C
 1
SPRAY TOWER (SPARE)
 4/7R
DAVY
  207.16
   4B.9
   47.
CONCRETE AND 316 SS
   33.0
              - (' 439000 ACFM>
               (  120 F)
               (  750
               (16.0 IN-H20)
               t 10.8 FT/S)
               (  .0!3 GR/SCF)
    4.0
    J.3
     .1
   75.0
  700
   70
   90.0
DRV FAN
NUMBTR

****
****
INDIRECT  HOT  AIR
STfAM
    27.8         (    50  F>
 ** wATEP  LOOP
     TYpF
     FRESH MAKEUP  WATER  ADDITION - LITERS/S

 ** BYPRODUCTS
     BYPRODUCT  NATURE
     BYPRODUCT  QUANTITY  - B T/H
     DISPOSITION

 ** DISPOSAL
     NATURF
     TYPE
     TRANSPORTATION
          - ACRES
 CLOSED
    30.2
                (   480  GPW)
           SULFUR
      .85        (    .94  TPH)
 MARKETED
 FINAL
 ASH POND
 TRUCK
   ?BO.O
	PERFORMANCE DATA	
PERIOD MODULE  AVAILABILITY OPEPAnlLlTY  fFLlABlLXTY UTILIZATION
                 X REMOVAL
                 S02  PART.
                             PER   BOILER
                            HOURS HOURS
 FGD
HOURS
 CAP.
FACTOR
 4/78  SYSTEM
       ** PRO&LEMS/SOLUTIONS/COMMENT;
             START DATE   4/78     IOUIFMINT:  FGD  SYSTEM,  GENERAL
             END DATF     4/78     COMMENTS:
                          SCZ AdSORBTIOb BEGAN ON  *P"K 8,  1978  USING  TWO
                          THIRD OF THE  FLUE GAS IS BEING  BYPASSED.
             AFFECTED MODULES: SYSTEM
                                                                              720
                           OF THE FOUR CELLS.  ONE
                                                287

-------
EPA UTILITY  FGD  SURYTY; DtCtX&ER 1      16U1H»ENT:  FSB SYSTFM, GENERAL
              bND DATF     5/78      F'ROBLFM: NOT 0 E F IN ED /S PE Cl f 1 ED
                           THE  AtSORBfRS  WERE DOWN FOR 26 HOURS*
              AFFECTED MODULES:  SYSTtf*

  5/7!   SYSTEM                                                                  74*

  6/7?.   SYSTEM                                                                  720


        ** PROBLEHS/SOLUTlONS/tOMMENTS
              START DATE   fc/78      t&UltKENT:  SCRUBBER
              END DATE     7/78      FROPIEM: NOT D E FIN ED /SPE Cl F I ED
                           A HIGH  PRtfSUKE  DROP ACROSS THE: VENTURIS PREVENTED FULL  FLUE  GAS  THROUGH
                           ThE  FGD  SVSTEC.
              AFFECTED MODULES:  SYSTEM

  7/78   SYSTEM                                                                  74*

  8/7R   SYSTtI*                                                                  744

        **  PROBLE«S/SOLU1IOMS/COII!WENTS
              START UATE   8/78      eCUIIfiENT:  SCRUBBFR
              END DATF     9/78      PFOBLFM: NOT DE FINED /S PF Cl F I ED
                           THE  HIGH PRESSURE DROP WAS LOWERED BY  ADJUSTING INTERNAL  PLUMB BOBS.
              AFFECTED MODULES:  SYSTEM

        **  PROBLfcMS/SOLUTlONS/COPKENTS
              START DATf   R/78      EOUIFKENT:  MIST ELIMINATOR
              END DATE     9/78      HFOBttM: (JOT DEFINED/SPECIFIED
                           REPAIRS  Ulft  F
-------
                                             EPA UTILITY FfC SURVEY! DFCfKBlR 1978 - JANUARY 1979
                                           SECTION 3
                    DESIGN AND PERFORMANCE DATA FOR OPERATIONAL FED SYSTEMS
	— —			PERFORMANCE DATA			
PERIOD MODULE  AVAILABILITY OPERAB1LITY PLIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGO   C«P>
                                                                $02  PART. HOURS HOURS  HOURS FACTOR

             AFFECTED MODULES: SYSTEP

 1/79   SVSTtf                                                                 7U

-------
FPK UTILITY  FGD  SURVfY: DECENgFR  197F  - JANUARY 1979
                                             SECTION  3
                     OESIC.N  AND  PFRFORMISfE bATA FOR OPFRATIONAL F G [> SYSTEMS
 COMPANY  N'AMfc
 PLANT  N«ME
 UNIT NUMBFR
 CITY
 STATE
 RF6ULATORY  CLASSIFICATION
 PARTICULATE EMISSION LIMITATION  - NG/J
 S02  EMISSION  LIMITATION  -  NG/J
 NfT  PLANT GENERATING CAPACITY  -  KW
 GROSS  UNIT  GENERATING  CAPACITY  - MW
 NET  UNIT GENERATING CAPACITY  W/FGD - »U
 NFT  UNIT GENERATING CAPACITY  WO/FGD - l-W
 EOUlVALfNT  RCRUP6FD CAPACITY  -  fW

 *• POILFR DA1A
      SUppLItR
      TYPE
      SERVICE LOAD
      COMMERCIAL SERVICE  DATE
      MAXIMUM 60 HEP  FLUE  GAS  FLOVI - CU.-/S
      FLUF. GAS  TEMPFRATURE  - C
      STACK HEIGHT  -  f
      STACK TOP DIAMETFR  -  M

  **  FUEL  OAT*
      FUEL TYPE
      FUEL FRADF
      AVER Aft HEAT  CONTENT  - KJ/KG
      RANFiE HtAT CONTENT  - P TU/LP
      AVERAGE ASH  CONTENT - J
      MANCE ASH CONTENT  - %
      AVERAGE MOISTURE  CONTENT  - X
      RANGE W01STURF  CONTENT -  V
      AVERAGE SULFUR  CONTENT -  t
      RANGE  SULFUR  CONTENT  - X
      AVERAGE CHLORIDE  CONTEST  - %
      RANGE  CHLORIDE  CONTENT - *
      FUEL FIRING  RATF  - f T/H
      FUEL FIRING  RATE  - HW
PUPLlC  SERVICE  OF NEW MEXICO
SAN JUAN
WATER FLOW
NEW "tXICO
P
   21.
  146.
*******
  TSP.O
  30ft.0
*******
  35P.O
******
******
BASE
**/**
  6ZZ.44
  12?.(t
******
*******
   27. 45
******
   14.82
******
      .PO
* *****
*'******»
* *****
  181.4
*****
                   .05G LP/RMRTU)
                   .3*0 LR/fHBTU)
                <1319000 ACFM)
                <  253 F)
                <**** FT)
                (*****  FT)
                <  9000 BTU/LP)
                 ***** *
                (200 TPH)
     ESP
      TYpr
      SUPPLI tR
      PARTICULATt  OFSIGN REMOVAL EFFlCIEIif.Y  -  *

  ** PARTICULATE  SCRURBER
      NUMBER
      TYPE
      SUPPLIER
      SHELL  MATERIAL
      LINING  MATERIAL
      FLUE 6AS  CAPACITY - CU.M/S
      FLUE GAS  TEMPERATURE - C
      LIQUID  RECIRCULATIDN RATE - LITER/S
      PRESSURE  DROP - KPA

  •« F6D SYSTEM
      SALEABLE  PROD UCT/THP OW AWAY PRODUCT
      GENERAL PROCESS TYPE
      PROCESS TYPE
      SYSTEM  SUPPLIER
      CONSTRUCTION  FIRM
      DEVELOPMENT  LFVEL
      NEW/RETROFIT
      PARTICULATE  DESIGN REMOVAL EFFICIENCY  -  %
      302 DESIGN  REMOVAL EFFICIENCY - X
      INITIAL START-UP
      CONSTRUCTION  INITIATION

  ** ABSORBER
      NUHPER
      TYPF
      SUPPLIER
      SHELL  MATERIAL
      BOILER  LOAD/APSORBER . Z
  1
HOTSIDE
WESTFRN  PRECIplTAflON
    99.5
DAVY POWERGAS
CARBON STEEL
ACID BRICK
?5?.Z
136.1
224.9
3.0



( 545POO ACFK)
< 277 F)
( 3570 GPP)
t 1? IN-H20)
SALEABLE PRODUCT
WET  SCRUBBING
DAVY  POWER6AS
STEARNS AND ROGER
FULL-SCALE
RETROFIT
    99.50
    85.00
  8/78
  1/76
 SPRAY TOWERS
 DAVY  POWER6AS
 CONCRETE AND 316  SS
    3T.O
                                                  290

-------
                                            KPA UTIUTY  fSft  SUSV1Y8  DiCfMBiR 1978 • JANUARY
                                           SECTION  3
                   DESIGN AMD PiRFOUtAKCI  DATA FOR OPERATIONAL  FiB SYSTFMS
   SAS  FLOW  -  CU.M/S
   6AS  TEMPERATURE  - C
   L/6  RATIO - L/CU.H
   PRESSURE  DROP  -  KPA
   SUPfRflCAL  6AS VELOCITY - M/S5C
   PARTICUIATE OUTLtT LOAD- 6/CU.fl
   So2  INLCT CONCENTRATION - PPM
   SO 2  OUTUIT  CONTRATjCN • PPM
   S02  DIS16N  REMOVAL EFFICIENCY - X

** Al'SORBSl!
    TYPf
    SUPPLIIR
    SHELL MATERIAL
    BOILER LOAD/AF!SORBER - S
    6AS FLOW  - CU.M/S
    CAS TEMPERATURE - c
    L/C RATIO - L/CU.M
    PRESSURE  DROP - KPA
    SUPfRFKAL KAS VELOCITY -  P/SSt
    PARTICULATE OUTLtT LOAC. 6/CU.H
    502 INLET CONCENTRATION -  PPM
    S02 OUTLET CONTRAT10N  • PPM
    S02 OF El ON REMOVAL EFFICIENCY  -  X
                                                  107. 16
                                                   48. 9
                                                     .2
                                                    4.0
 439000 ACFH)
  120 F>
  1.7 6AL/1000ACF)
U.Q IN-HZO)
 10.P FT/S)
  .079 6R/SeF>
                                                   85
                                                   65.0
                                                 1
                                                SPRAY TOWER (SPARE)
                                                DAVY POME8GAS
                                                CONCRETE AND 3U SS
                                                   JJ.O
                                                  ?Q7.U       < 439000 ACFM)
                                                   4?,9        (  12R F)
                                                     • 2        (  1.7 6AL/1000ACF)
                                                    •4^0        <1«.0 IN-H2O
                                                    T.S        ( 10.8 FT/S)
                                                     .2        (  .079 GR/SCF)
                                                 1200
                                                   85
                                                   85.0
** FANS
** PUMPS
    SERVICE
    SLURRY
    VENTURI RECIRCULATION

 ** RtHEATER
    TYPE
    HEATIN6 MEDIUI"
    TEMPERATURE BOOST  -  C

 ** WATER LOOP
    TYPE

 ** BYPRODUCTS
    JYPRODUCT  NATURE
    BYPRODUCT  QUANTITY - PI  T/H
    DISPOSITION

 ** DISPOSAL
    NATURF
    TYPF
    LOCATION
    AREA - ACRES
                                                INDIRECT HOT AIR
                                                STEAK
                                                   27.8         C    50  F)
                                                CLOSED
                                                ELEMENTAL  SULFUR
                                                MARKETED
                                                FINAL
                                                ASH  POND
                                                OFF-SITE
                                                  2ROO.O
                                                                   2.25  TPH)
PERIOD MODlILt  AVAILABILITY OPE PAPlUTY
                                          PERFORMANCE DATA ----- — ---- -- --- — ------------------ -----
                                                   UTILIZATION  X REMOVAL   PER  BOILER  F60   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR
 6/7*   SYSTEM
       **  PROBLEMS/SOLUTIONS/COMMENTS
             START DATE   f /7fc     E«UIf*iENT:  F6D  SYSTEM,  6ENERAL
                          9/7S     CCMMCMTS:
                          INITIAL 0(f RATIONS hEGAN IN  LAtE  AUGUST.
                          FCR THE FIRST TIME IN  EAPLY  SfcPTF»TfER«
             AFFECTED MODULES: SYSTfl"
                 DATE
                                                                             7A4
                                                                   ALL THREE  MODULES  RAN TOGETHER
       ** PRCbLfPS/SOLUTIONS/COMMENTS
             START  BATE    !>./?&     EWUIfMENT: 6AS DAMPER
             END  DATF      9/78     PPOFLFM: MOT DEFINED/SPFClFI ED
                          PKOBIEMS kERC (NCOUNTEBED WITH yOOSTER  FAN  CONTROL  DAMPER.
                                               291

-------
EPA UTILITY  FGD SURVEY: DECE!«[
-------
                                            EPA UTILITY FGD SURVEY:  DECEMBER  1978  - JANUARY 1979
                                          SECTION 3
                  DESIGN AND PERFORMANCE  DATA FOR OPERATIONAL FGo SYSTEMS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION  LIMITATION - KG/J
S02 EMISSION LIMITATION  -  H.G/J
NET PLANT GENERATING  CAPACITY  - MW
GROSS UNIT GENERATING CAPACjTY - ftk
NET UNIT GENERATING  CAPACITY W/FGD - Mt
NET UNIT GENERATING  CAPACITY WO/FGD -  I»W
EOUIVALENT SCRUBBED  CAPACITY - MW

«* BOILER  DATA
    SUPPLIER
    TYPE
    SERVICE  LOAD
    COMMERCIAL  SERVICE t>ATk
    KAXIMUM  BOlLtR FLUE  GAS FLOW - CU.i"/S
     FLUE  GAS  TEMPERATURE - C
     STACK HEIGHT  - M
     STACK TOP DIAMETER - M

 **  FUEL DATA
     FUEL  TYPE
     FUEL  GRADE
     AVERAGE  HEAT  CONTENT - KJ /KG
     RANGE HEAT  CONTENT - B1U/LB
     AVERAGE  ASH CONTENT -  I
     RANGE ASH CONTENT - *
     AVERAGE  MOISTURf CONTEt,T  - 1
     RANGE MOISTURE CONTENT -  X
     AVERAGE SULFUR CONTENT -  It
     RANGE SULFUR  CONTENT - *
     AVERAGE CHLORIDE CONTENT  - %
     RANGE CHLORIDF CONTENT -  '/.
     FUEL FIRING RATE - M T/H
     FUEL. F IRING RATE - MW

 ** ESP
     NUMBER
     TYPE
     SUPPLIER
                                               SOUTH CAROLINA  PUBLIC  SERVICE
                                               WINYAH
                                               2
                                               GEORGETOWN
                                               SOUTH CAROLINA
                                               A
                                               ******          (******  L8/MMPTU)
                                               ******          <»*****  LR/MMBTU)
                                               *******
                                                 26C.O
                                                 25P.O
                                                 260.0
                                                 1*0.0
                                               BABCOCK AND WILCOX
                                               PULVF.RUFD  COAL
                                               BASE
                                                0/77
                                               ********        (*******
                                                 132.?         <  Z70  F)
                                               ******          <* ***  FT)
                                               *******         (*****  FT)
                                               COAL
                                               BITUMINOUS
                                                 26749.

                                                   13.50
                                               ******
                                               ********
                                               6.5-7.0
                                                    1.00
                                               1.0-1.2
                                               ********
                                               ******
                                               * ******
                                               *****
               < 11500 BTU/LB)
                ******
               (*** TPH)
                                                COLD  SIDE
                                                RESEARCH COTTpELL
** pARjICuLATE SCRUBBER
    NUMPER
    TYPE
    FLUE  GAS  CAPACITY - CU.K/S
    FLUE  GAS  TEMPERATURE - C
    L/G RATIO - LIUR/CU.M
    pRESSURF  DROP - KPA
    SUPERFICIAL GAS VELOCITY - K/S

** FGD SYSTEM
    SALEABLE  PRODUCT/THPOW AWAY PROfL'CT
    GENERAL PROCESS TYFF
    PROCESS TYPE
    SYSTEM  SUPPLIFR
    A-E FIRM
    DEVELOPMENT LFVEL
    NEW/RETROFIT
    PARTICULATE DESIGN REKlVAl EFFICIENCY
    S02 DESIGN REMOVAL EFFICIENCY  -  %
    INITIAL START-UP

** ABSORBER
    TYPF
    INITIAL START UP
    GAS FLOW - CU.M/S
    GAS TEMPERATURE - C
    t/G RATIO - L/CU.M
    PRESSURE DROP - KPA
    SUPERFICAL GAS VELOCITY  -  M/SEC
    S02 INLET CONCENTRATION  -  PPM
VENTURI
  19?.1
  13?.2
    1.9
     .7
   27.*
                                                                 <  407015  ACFM)
                                                                 (   270  F)
                                                                 (14.*  GAL/1000ACF)
                                                                 (    7  IN-H20)
                                                                 (    9n.O  FT/S)
THPOVAWAY PRODUCT
WET SCRUBBING
LIMESTONE
BABCOCK R VILCOX
BURNS AND PCE
FULL-SCALE
NEW
   99.4Q
   6".DO
 7/77
 1
TRAY TOWER
 7/77
   159.50
    5?.?
    ft. 3
    1.1
    7.2
   935
                                                                 ( 33BOOD ACFPi)
                                                                 (  126 F)
                                                                 { 47.5 6AL./1DOOACF)
                                                                 < 4.5 iN-H20)
                                                                 < 10.5 FT/S)
                                               293

-------
fPA UTILITY (dt SUPVtYs  PECEI»Fif(i  1«7r  • JANUARY 1979
                                            SECTION 3
                     PIS1CN AM) F"(RFOfcMA%CI DATA FOR OPERATIONAL  F(.0 SYSTFMS
      S02 OUTLET  CONTRATION • fff
      SO? BfSI&N  ftlMOVAL  FFFICI1NCY - X
 ** FANS
     TYpF
                                                   60.0
                                                           O. FAN
    siRvirt

    SLURRY

«« REHIATER
    TYPE

*» THICKENER
      DIAMtTEK  - M
      OUTLET  SOLIDS  - i

  «*  WATEP  LOOP
      TYpt
      FRESH MAKEUP  VATtR ADOlTICn - LITFL'/S

  **  REA&rNT  f'REPARATION fQUIPMfNT
             OF BALL MILLS
  ** DISPOSAL
      NATURE
      TYPE
      LOCATION
      TRANSPORTATION
                                                 NU»Sf R

                                                 ****
                                                   5«.
                                                OPFN
                                                                 ( 50 FT)
                                                    fc.J
                                                FINAL
                                                UNL1N£D POND
                                                ON SITE
                                                PIPE
                                                                  ion GPP))
 	.—.	-PERFORHANCF  DATA	
 PE"IOD MODULI AVAILABILITY OPERAPILITY  «HIABIIIT»  UTILIZATION  % REMOVAL   PER  BOJLER   FGD    CAP.
                                                                  S02  PART. HOURS HOURS   HOURS  FACTOR
  2/78
  J/7R

  4/78
  5/78

  6/7f

  7/78

  8/7?
                                                                              672

       **  PR06LEMS/SOLUTIONS/COKMENTS
             START  DATE    2/78     EOUJTMtNT: FGD SYSTEM, GENERAL
             END  DATE      3/7E     COMMINTS:
                          THE FCD SYSTEI* WAS BYPASSED FOR SERVERAL  BAYS  TO  ALLOW SYSTEM CLEANIN& IN
                          PREPARATION Fr,R TESTING PY UABCOCK AND  WILCOX.
                      MODULtS: SYSTEM
       SYSTEM

       SYSTEM
744

720
        ** PftOULEMS/SOLUTIONS/CCMMENTS
              START DATE   4/76      tOUH^ENT:  FGD  SYSTEM,  GENERAL
              END DATE     5/78      PfOPlEM!  CHEMICAL-RELATE0 SCALING
                           SONE  MINOR SCAtiNfi WAS  ENCOUNTERED BUT IT DID NOT  CAUSE  AN  OUTAGE.
              AFFECTED MODULES:  SYSTEM
       SYSTEM

       SYSTEM

       SYSTEM

       SYSTEM

       **  PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE    S/78     EOUIFMENT: FGD SYSTEM,  GENERAt
             END  DATE      9/78     COI-ilMNTS:
                          THE UTILITY RC^ORTED NO FORCED  F6D  OUTAGE.
             AFFECTED  MODULES; SYSTEM
74*

720

744

744
722
  9/78  SYSTEM
                                                                                720
                                                 294

-------
                                      EPA UTILITY  FGD  SURVEY:  DECEMBER  1978  - JANUARY  1979
                                    SECTION 3
             DESIGN AND PERFORMAKE DATA FOR OPERATIONAL  FGD  SYSTEMS
: ------------------------------------------ PERFORMANCE  DATA
PERIOD MODULE AVAILABILITY  OPERABILITY  ^LIABILITY UTILIZATION
                                                          X  REMOVAL    PER   BOILER   F6D    CAP.
                                                          S02   PART.  HOURS HOURS  HOURS  FACTOR
10/7?

11/76

12/78
** PROBLEMS/SOLUTIONS/COMMENTS
      START DATE   9/76     E6UIFWENT:  INSTRUMENTATION
      fcND DATE     9/73     COMMENTS:
                   THE SO?  ANALYJKRS PERFORMED  WELL DURING A CERTIFICATION TEST.
      AFFECTED MODULES:  SYSTEM
SYSTEM

SYSTEM

SYSTEM
84.8
£2.6
62.6
                                                 82.1
                                                                              744

                                                                              720

                                                                              744
                                                                             740   611Q
*» PSOULEMS/SOLUT10NS/COMMENTS
      START  DATE   12/76      EOU1IMENT:  INSTRUMENTATION
      iND DATE      1/79      ppOBltM: NOT DEFINED/SPECIFIED
                    SC2  MONITOR  PROBLEMS CONTINUE.
      AFFECTED MODULES:  SYSTEM

** PROBLEMS/SOLUTIONS/COMMENTS
      START  DATE   12/76      fcOUl f^ENT:  PU«P« OTHER
      END DAT?      1/79      (SOPO*: NOT DEFINED/SPECIFIED
                    AN OUTAGE WAS  NECESSARY FOR ABSORbER PUMP KELT RENEWAL.
      AFFECTED MODULES:  SYSUP

*« PROULEMS/SOLUTIONii/COMMENIS
      START  DATE   1?/7B      EOUIffENT:  INSTRUMENTATION
      END DATE      1/79      HKOBit-M: NOT DEFINED/SPECIFIED
                    FEED  SLURRY  flOUMETER PROBLEMS WfBE ENCOUNTERED.
      AFFECTED MODULES:  SYSTtM

** PROBLtKS/SPLLnl ON S/CCKMENTS
      START  DAT?   12/7S1      tCUlC*£NTi  REAGENT HANDLING
      END  DATE      1/79      FRORttMS NOT DEFINED/SPECIFIED
                    THE OIL PUMP fOR LIMESTONE MILL EXPERIENCED TRIpS.
      AFFECTED  MOBUIES:  SYSTEM

 ** PRObLEMS/SOLUTIONS/COMKENTS
      START  DATE   1?/78     ECU! WENT:  REAGENT HANDLlNb
       END  DATF:      1/79     PKOEI>M: PLUGGING, OTHER
                    A MINOR OUTAC, • WAS CAUSED  RY  PLUGGING  Of THE  SLURRY DELIVERY LINT.
       AFFECTED  MODULES: SYSTfcK

 **  PROBLtttS/SOLUTIOHS/COI"lK!£N1S
       START  DATE   12/7P,      EOUl'KENT: SCRUBBFR
       END  DATE      1/79     PROBLEM: NOT 0 E FIN ED /S PE CI F I ED
                    QLENCHFR PROBLEMS WERE EXPERIENCED  DURING  DECEMBER.
       AFFECTED  MODULES: SYSTtM
   1/79  SYSTtM
             99.6
                         99.6
                                     99.6
                                                  99.6
                                                                        744
                                                                              744   7*20
                                          295

-------
rPA UTILITY  F66  SURVEY:  PtCt*t)FR 19?f - JANUARY  1979
                                             StCTlON 3
                     OtSICN AND rtRFORMKE  DATA  FOR OPFRAT1CNAL F60  SYSTEMS
 COMPANY  NAMt
 PLANT  NAKE
 UMT NUfBffi
 CITY
 STATE
 REGULATORY  C LA SS 1 F J C AT ION
 PARTICULAR  EMISSION LIMITATION - KC/J
 S02  EMISSION  LIMITATION - KG/J
 NFT  PLANT  GENERATING CATAC1TY - MW
 GROSS  UNIT  tlNSRATINL CAPACITY - MV
 NET  UNIT GENERATING CAPACITY V/FGD - W
 NET  UNIT GENERATING CAPACITY WC/FGt -  f
 EOUIVALINT  SCRUP6FD CAPACITY - WW
    SOUTHERN  MISSISSIPPI ELECTRIC
    R.P.  MORROW
    HATTiSEURG
    MISSISSIPPI
    A
        AT.
       S1*.
       400.0
       ?00.0
       1SP.O
    * *•**» **
       124.0
(   .100 LP/HMSTU)
<  1.200 LP/F1MBTU)
  *«  B01LFR  CATA
      SUPPLIER
      TYPf
      SERVICt LOAD
      COMMERCIAL SERVICE DATE
      MAXIHU* t.OHER FLUE GAS  FLOW  -  CU.f/S
      FLUE  6A<-  TIMPFRATUKT .  C
      STACK  HEIGHT - f»
      STACK  TOP DIAfETER - M

  **  FUEL DATA
      FUEL  TYPE
      FUEL  GRADE
      AVERAGE HEAT CONTENT -  KJ/KG
      RANGE  HEAT CONTENT - FTU/Llt
      AVERAGE ASH CONTENT -  1
      RANGE  ASH CONTENT  - X
      AVEF-AGE MOlSTURf: CONTENT  - X
      RANGE  KCJSTURE CONTENT  -  X
      AVERAGE SULFUR CONTENT  -  1
      RANGE  SULFUR CONTENT -  X
      AVEBAFE CHLORIDE CONTENT  - X
      KANGE CHLORIDE CONTENT  -  *
      FUEL  F Jf IN6 RATE - W 7 /H
      fUEl  FIFIN6 RATE - WW

  ** ESP
      TYPF
      SUPPLIER
      PARTICIPATE  DFS16N  PEUCVAL  EfFIClE(«CY

  ** FGO SYSTFM
      SAUFABLF PRODUCT/TH»OWAWAY  PRODUCT
      GENERAL  PROCESS  TYPF
      PROCESS  TYPE
      SYSTEM SUPPLIER
      A-t  FIR*
      CONSTRUCTION  FIRK
      DEVELOPfiENT  LEVEL
      NEW/RETROFIT
      PARTICIPATE  DFSI6N  PEHCVAL  EFFICIEfCY
      SOZ  DESIGN REMOVAL  EFFICIENCY - X
      INITIAL  START-UP

  •* ABSORBFR
      NUMBER
      TYPE
      INITIAL  START  UF>
      SUPPLI f.R
      NUMBER OF STAGES
      DIMENSIONS
      INTERNAL MATERIAL
      GAS  FLOW - CU.M/S
      GAS  TEMPERATURE  -  C

  *« fANS
      TYPF

  ** VACUUM FILTER
      NUMPER
      OUTLET SOLIDS  -  X
     RHEY  STOKER
     PULVFRI2ED  COAL
     BASE
      0/7P
       13?. 2
       12*.
     COAL
     ******
      27912.

         fi'.OO
     ******
     ********
     1.
         1.00
     ******
     * * ******
     ******
     *******
     *****
(******* ACFM)
C 270 F)
t 408 FT)
(***** FT)
< 12000 BTU/LEl)
 ***** *
<***
     HOT SIDE.
     BU.ELI/ENVIROTECH
  2     99.6
     THROWAWAY PRODUCT
     WET SCRUBBING
     LIMESTONE
     RIUY STOKER/ENVIRONEEFtING
     tUBNS AND MCDONALD
     RILEY STOKER
     fUIL-SCAIE
     NEW
- X     99.6Q
        85.00
     VENTURI-ROD
      8/7P
     RILEY STOKFR/ENVIRONEERING
         7
     90 X 40 X 1C
     7 LAYERS OF STAINLESS  STFEL ROBS
       192.03        (  406940 ACFM)
       1J?.2         <   270  M
            I-D
                                                     60.0
                                                 296

-------
                                             FPA UTILITY  FGD  SURVEY:  OFCfMBER  1976  - JANUARY 1079
                                           SECTION 3
                   DESIGN  AND  P£RFOfMA*CE DATA FOR OPERATIONAL  FGO  SYSTFHS
** HIST EL 1W1NATOR
NUMBER
CONFIGURATION
*« REHEATER
TYpE
** THICKENER
NUMBER
** WATER LOOP
TYpF
** TREATHfNT
TYPE
SUPPLIER
1
VERTICAL
BYPASS
1
CLOSED
fLYASH STARILIZtO
NONPRQPRI tTARY
 «*  DISPOSAL
    NATURE
    TYPE
    LOCATION
    TRANSPORTATION
                                                FINAL
                                                LANDFILL
                                                OFF-SITE
                                                TRUCK
..	PERFORMANCE  DATA	
PERIOD  MODULE  AVAILABILITY OPERAPILITY  KLIAPILITY  UTILIZATION   x  REMOVAL    PER  BOILER  FED   CAP.
                                                                 SC2  PART. HOURS HOURS  HOURS FACTOR
 8/78   SYSTEK
                                                                              744
 9/7P

10/7!?
11/7c.

1?/7F
       **  PRORLEWS/SOLUTIONS/COMKENTS
             START  DATE   5/78     E6UIIWENT:  EIOI LFR-R E LATF D
             tND OATF     9/78     COMMITS:
                          A FORCED bCIl'-R  OUTAGE  OCURRED  OUH1N6 THE PERIOD AS A RESULT OF P01LER
                          TUBE LEAKS.
             AFFFCjED MODULES: SYSTEM
       SYSTE»

       SYSTEM
720

744
       ** PROBLEWS/SOLUT10NS/COKMENTS
             START DATE  10/78      EOUI FMENT:  BOI LER-RFLA T F 0
             END DATE    11/78      COMMENTS:
                          OPERATION  OF  IHE  UNIT WAS  INTERMITTENT DUE TO CONTINUING BOILER TUBT
                          PROBLEMS.  TM!  EOlLtR WAS  SHUT D 0 yfi NOVEMBER 1 AS A RESULT OF BOILER TUBE
                          PKOPLEMS.  RESUMPTION OF  OPERATION IS SCHEDULED FOP MARCH 1979.
             AFFECTED MODULES:  SYSTEM

       *« PROElLEWS/SOLUTIONS/COMKENTS
             START DATE  10/78      ECUIfKENT:  VALVES
             END DATE    1C/7*      PPOEltM: CHEMICAL-RELATED PLUGGING
                          ThE FGD  SYSTEi-  WAS  FYPASSED ENTIRELY IN OCTOPER DUE. TO SERIOUS CONTROL
                          VALVE  PLUGG1M.
             AFFECTED WOOtlLES:  SySTCf
       SYSTEM

       SYSTEM
720

744
       ** PROeLEtfS/SOLUTIONS/CCMMENTr
             START DATE  12/78      EQUIf'ENT:  FGD  SYSTEM, GENERAL
             END DATE     1/79      CCKCTMTS:
                          T»,E UNIT  H*S  f>OT  YET BEEN RESTARTED SINCE ITS NOVEMBER SHUTDOWN,
             AFFECTED MODULES:  SYSTtF
 1/79  SYSTEM
                                                                              744
                                                297

-------
EP» UTILITY  FGO  SURVEY: DECEMBER  197?  - JANUARY 1979
                                             SECTION 3
                     DESIGN  AND  PERFOPMKCE DATA FOR OPERATIONAL F6D SYSTEMS
 COMPANY  NAME
 PLANT  NAMF
 UNIT NUMFER
 CJTT
 STATE
 RECULATORY  CLASSIFICATION
 PART1CULATE  EMISSION LIMITATION  - Nt/J
 502  EMISSION  LIMITATION -  &G/J
 NFT  PLANT 6E(,ERATING CAPACITY  -  MV
 GROSS  UNIT  GENERATING  CAPACITY - Mk
 NET  UNIT GENERATING CAPACITY  W/FGD - Ml,
 NFT  UNIT GEKERATING CAPACITY  WO/FED - <>W
 EOU1VALFNT  SCRICBED CAPACITY  - MW
                                                SPRINGFIELD CITY UTILITIES
                                                SOUTHWEST
                                                SPRINGFIELD
                                                MISSOURI
                                                A
                                                    41.
                                                   516.
                                                   173.D
                                                   194.0
                                                   177.0
                                                   18?.0
                                                   194 .0
                (   .100 LB/MMSTU)
                (  1.2PO L6/MMBTU)
** riOILER DATA
    SUPPLIER
    TYPF
    SERVICE LOAfi
    COMMERCIAL SERVICE  DATS
    MAXIMUM [.OILER  FLUE GAS -FLOW - CU.MS
    FLUE GAS TEMPERATURE  - C
    STACK HE IGHT  -  M
    STACK TOP  DIAMETER  -  M

** FUEL DATA
    FUEL TYPE
    FUEL GRADE
    AVERAGE HEAT  CONTENT  - KJ/KG
    RANGE HEAT CONTENT  -  ETU/Lfc
    AVERAGE ASH  CONTENT - *
    RANC-E ASH  CONTENT - %
    AVERAGE MOISTURE  CONTENT
    fiANFE MOISTURE  CONTENT - *
    AVERAGE SULTUR  CONTENT - X
    RANGE SULFUR  CONTENT  - X
    AVERAGE CHLORIDE  CONTEKT -
    RANGE CHLORIDE  CONTENT - X
    FUEL F IR1NG  RATF  -  M  T /H
    FUEL FIRING  RATE  -  MW

«* ESP
                                - X
       TYPF
       SUPPLIER
       PARTICULATE  DESIliN KEfCVAt EFFKIEKY
       FLUE  GAS  TEMPERATURE - C

  *• FGD  SYSTEM
       SALFABLE  PRCDUCT/THROW*WAY PRODUCT
       GENERAL  PROCESS  TYPE
       PROCESS  TYPE
       SYSTEM SUPPLIER
       A-t FIR*
       DEVELOPMENT  LEVEL
       NEW/RF TROF1T
       PARTICULATE  DESIGN REMtVAL EFFICIEKY
       SOZ DESIGN  REMOV*L EFFICIENCY - X
       INITIAL  START-UP

  •* ABSORBER
       TYPE
       INITIAL  START  UP
       SUPPLI E"?
       NUMPER OF  STAGES
       &OHER LOAD/APSORE tR - X
       GAS  FLOW - CU.K/S
       GAS  TEMPERATURE - C
       L/6  RATIO  - L/CU.M
       SOj  DESIGN REPOVAL EFFICIENCY

     FANS
       TYpF
                                                  RILEY  STOKER
                                                  PULVERIZED  COAL
                                                  BASE
                                                   0/76
                                                     117-
COAL
BITUMINOUS
 Z9075.

   17.00
******
********
6-12
    3.50
******
      .30
******
                <******* ACF*)
                (  300 F)
                (  384 FT)
                <***** FT)
                                                                  < 12500 BTU/LB)
                                                                  <*** TPH)
                                                  1
                                                 COLD SIDE
                                                 AjR CORRECTION  DIVISION,  UOP
                                                    99.7
                                                   UP.9         (   300  F>
                                                 THROUAWAY
                                                 WET SCRUBBING
                                                 LIMESTONE
                                                 AIR CORRECTION  DIVISION,  UOP
                                                 BURNS t MCDONNELL
                                                 FULL-SCALE
                                                 NEW
                                            - X     99.70
                                                    BO .00
                                                  4/77
                                                  2
                                                 TCA
                                                  4/77
                                                 AlR CORRECTION  DIVISION, UOP
                                                    50.0
                                                   15*.91
                                                   14f.9
                                                     2.1
                                                    91.7
                                                   BOILER I.D.
                < 332500 ACFH)
                (  300 F)
                ( 16.0 GAL/1DOOACF)
                                                  298

-------
                                             6PA UTUITV FfiD SURVFYi  DECEIVE*  1978  -  JANUARY  1979
                                           SfCTlON 3
                           AND  PtRrORKAKE DATA FOR OPERATIONAL F6D SYSTTMS
** VACUUM FILTER
    TYPE
    OUTLET SULKS -  X

M MIST ELIKINATOR
    TYPF
    NUMBER OF  STAftS

 ** PROCfSS CONTROL  CHEMISTRY
    CONTROL VARIAPUS

 • » THICKENER
    NUMPER

 ** WATER LOOP
    TVpf

 ** TREATMENT
    TTPF
    PRODUCT CHARACTERISTICS

 «* DISPOSAL
    MATURE
    TYPE
    TRANSPORTATION
    AREA - ACRES
                      ROTARY DRUM
                         6H.O
                      CHfVRON



                      PH, <5AS FLOk,


                       1


                      CLOSED
                      NONPROPR]ETARY
                      DRV FLYASH  STABILISED
                      FINAL
                      LANDFILL
                      TRUCK
                         10.0
...............	PERFORMANCE DATA-----
PERIOD  MODULC  AVAILABILITY OPEfAtllHTY  IFLJABILITV UTILIZATION
                                       X  REMOVAL
                                       SO?   PART,
                                                                PER   BOILER   F(56    CAP.
                                                               HOURS HOURS   HOURS  FACTOR
 0/77  SYSTtW
          PROBLEMS/SOLUTIONS/COMMENTS
             START  DATE
             END  DATr
0/77
0/77
       SYSTEM

 S/77  SYSTEM

 7/77  SYSTEH

 8/77  SYSTEM
                                  FGD  SYSTEM,  GENERAL
                      CCMM fK'TS:
                         0( THE  LIMESTONE  FSD  SYSTEM  fc>AS  COMPLETED  DURING  THE  FIRST
             OUARTER OF 19 ?7  (BEHIND  SCHEDULE,  PRIMARILY  BECAUSE  OF DELAYS IN  ELECTRIC-
             AL WORK).  FOLLOWING  AIR/WATER  TESTS  AND CHECKOUT  OF LIMESTON5 PREPARATION
             FACILITIES, TI'E  FGD  PLANT  WAS STARTED UP IN  EARLY  APRIL  1977  FOR  MECHANIC-
             AL SHAKEDOWN/IEgUCGING OPERATIONS  WHICH  CONTINUED  THROUGHOUT  THE  SUMMER.
             COMPLIANCE TESTING  AND CERTIFICATION  OF  COMMERCIAL AVAILABILITY UEKt  SUC-
             CESSFULLY COMFLETED  IN SEPTEMBER,  JUST BEFORE  A  SCHEDULED  T-NONTH FALL
             StUTDOWN.  OPERATION  OF  THC  SYSTEM HAS BEEN  HAMPERED BY  A  NUMBER  OF  PR08-
             LCMS: MIST ELIMINATOR PLUGGING  (PIPING TO M.E. SPRAY SYSTEM HAS PEEN  MOD-
            IFICATION), COfftOSIOM  IN  THF  PRESATURATOR (WAS  RELINEO  WITH PRECRETE),
            CORROSION OF TfE:  INLET/OUTLET  GAS  CAMPERS (REPLACED WITH  7HSS DAMPERS),
            AND FAILURi OF  PRECRETE LINING  IN  THE  SCRU6PER  AND  CEILCOTE IN THE STACK
            (BOTH FAILURES  IDENTIFIED  AS  APPLICATION  PROBLEMS).  THf  UTILlTY ALSO
            FOIND IT NECESSARY TO  CHANGE  THE  SYSTEM'S PH  CONTROL  FROM 5.9  TO 5.*  TO
            INCREASE LIMES 10NE UTILIZATION AND  DECREASE PLUGGING  WITHIN THE SYSTEM
AFFECTED MODULES: SYSTt*

                                                                 7?,0

                                                                 744

                                                                 744

                                                                 744
       *«  PROBLEMS/SOLUTIONS/COHMENTS
             START DATE   8/77     ECUIPKENT:  F6D  SYSTEM,  GENtRAL
             END DATE     9/77     COMMITS:
                          THE FGD SYSTEM WAS OPERATED  ROUGHLY  «0 PERCENT  OF THE  AUGUST-SEPTEMBER
                          PERIOD.  A ME* JOURCE PERFORMANCE  TEST WAS  RUN  DURING  THF.  SECOND WEEK OF
                          SEPTEMBER.  L/lTERf THE UNIT  WAS  SHUT DOWN FOR THE FIRST  TURBINE  IN-
                          SPECTION.
                                                299

-------
FPA UTILITY  FtD SU*VrY;  DECfMPCP. 197f - JANUARY  1979
                                             SECTION  3
                     DESIC-N AND FERFOSHAliCE  DATA  FOR OPERATIONAL FGD SYSTFMS
                                            PERFORMANCF  DATA ------- -- ---- — -- --- - ------ —.- — — .. .....
       MODUlf  AVAILABILITY CPF. » Af! 1 1 1 T Y  '(LIABILITY  UTILIZATION  X REMOVAL    PER  BOILER  F6D   CAP.
                                                                  SC2  PART.  HOURS HOURS  HOURS  FACTOR
              AFFECTtfl  MODtlLlS: SYSTtK
 9/77   SYSTEM

ID/77   SYSTEM
                                                                    .70 99.7$    7?0
        **  PfcOeLEMS/SOLUTl ON S /C CMWENTS
              START DATE  10/77     EQUIIMENT:  gAS  DA|»PER
              IND DATE    11/77     PROFUEM:  D E SIGN-RFLATf D INFERIOR CONSTRUCTION MATERIAL
                           OITIFT OAKFER*.  WERE  MODIFIED {REPLACED WITH 316L  STAINLESS STEEL OANPERS).
              AFfF.CTED WOOULtS:
             START DATE  10/77      tOUIffi-NT:  F6D SYSTEHt GfcNERAL
             END D»TF    11/77      COMMfNTS:
                          A SCHEDULED  0 ITOBER -NOVEMBE R OUTAbE UAS  INITIATED.
                          TO  START  UF>  A
-------
                                              EPA  UTILITY FSB SURVEY: DECEMBER 1978  -  JANUARY  1979
                                            SECTION 3
                    DESIGN AND PERFORMAfvCE  DATA  FOR OPERATIONAL FGD SYSTEMS
.... --- ,- — ...... ----- .. --- - ------- ... ----- PERFORMANCE DATA ------ - ------------------------------- ....
PERIOD  MODULE  AVAILABILITY OPEPABILITY  PLIABILITY UTILIZATION  X REMOVAL.   PER  BOILER   F6D    CAP.
                                                                 S02  PART. HOURS HOURS   HOURS  FACTOR


       *» PROBLEMS/SOLUTIONS/COHMENTS
             START DATE   2/78      tCUIIMENT: F60 SYSTEM, GENERAL
             END DATE     3/78      COMMENTS:
                          TJiE  ABSORBERS ARE CURRENTLY BEING BY-PASSED*  THE FGD SYSTEM  IS  EXPECTED
                          TO BE  PACK ON LINE BY THE END OF APRIL.
             AFFECTED MODULES:  SYSUM

 3/78  SYSTEM                                                                  744

 4/78  SYSTEM                                                                  720

       *«  PROTEUS/ SOLUTIONS /COMMENTS
             START DATE   4/78      EQUIPMENT: FGD SYSTEM, EtNERAL
             tND PATE     5/78      CCRFUNTS:
                          ONLY  ONE  SCRU;i''ER-AbSORBfR MODULE IS  CURRENTLY  OPERATING.   THE EXPANSION
                          JOINT FAILURF MENTIONED PREVIOUSLY  WAS DIRECTLY  RELATED  TO  TH5 DAMPER
                          FAILURE  WHICH ALLOWED THE TOILER TO CONTINUE  PUMPIN6  t* S  TO THE  SEALfD  OFF
                          Ftft  SYSTEM.
             AFFECTED  MODULES:  SYSTEM

       ** PH06LEMS/SOLUTIONS/COMMENTS
             START DATE   4/78      EOUirHENT: ABSORBfR
             END  D*TF     5/7E      PROBLEM: DESIGN-RELATED INFERIOR  CONSTRUCTION MATERIAL
                          THE  UNIT  EXPERIENCED AN FRP LINER FAILURE  OVER  THE  PERIOD.
             AFFECTED  MODULES: SYSTtM

       ** PROBLEMS/SOLUTIONS/CCMMENTS
             START DATE   4/78      EfiUI l^ENl: PIPING
             END  DATE      5 /7P     PROBLEM: NOT  BE FINED/S Pf CI F HD
                          A  fUI»P FAHUfil OCCURRED PUP 1Mb  THE  PERIOD.
             AFFECTED  MODULES: SYSTEP
  5/78   SYSTEM                                                                  744

  4/7B   SYSTEM                                                                  720
              START DATE   fc/78     E«UrirgNTt  FGD  SY$TEM»  SfcNEfiAL
              END DATE      6/78     CCMMJNTS;
                           THE A-MODUIE  kAN  STEADILY  FOR  OVFR 11  DAYS,   8-MODULF HAS STILL DOWN WITH
                           EXPANSION JOIM PROBLEMS
              AFFECTED  MODULES: SYSTEM

        **  PRObLEMS/SOLUTIONS/COMMENTS
              START DATE   6/7?     tOUJffENT;  MIST ELIMINATOR
              END DATE      6/7(1     CftMMiNTS:  RESEARCH  AND  DEVELOPMENT
                           DURING THE MOMH  THE  MIST  FLIM1NA10H kASH SYSTEM W«S AI.TFRED FROM A SEPAR-
                           ATE CLOSED LOCH FOR  EACH MODULE  TO A COMMON  SYSTEM FOR BOTH MODULES.  THE
                           NEW SYSTEM TAKF8  SUPERNATANT  FRO* THE  TOP OF THE THICKENER FOR MIST ELIM-
                           INATOR SPMY.
              AFFECTED  MODULES: A      B

        **  PROBLEMS/SOLUTIONS/COMfENTS
              START DATE   6/78     tSUKNENT:  INSTRUMENTATION
              END DATE      6/78     f-ROBlEM: NOT DE FINED/S PF CI F I ED
                           IhSTPUMENTATICN PROBLEMS WERE  fiNCOUNTERED DURING THE MONTH.  PH PROBES
                           WERE LOST, THf MA6-FLOW  METER  FOR LIMESTONE  SLURRY FAILED, AND THE AUTO-
                           0ATIC GAS ANALYZERS  DIB  NOT  OPERATE  PROPERLY.
              AFFECTED  MODULES: SYSTLM

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   6/78     E«Uir«ENT:  PIPING
              tND DATE      6/7S     Pt'OBlFpl! PLUGGING,  OlHEP
                           SOHE PIPTS PLUGED  DUE TO  UfcOPRfcNE. PEELING  FRQ" VALVES"
              AFFFCTED  MODULES: SYSTEM
                                                 301

-------
EPA UTILITY KD SURVEY:  DECtrBFR  1971  - JANUAHY 1979
                                            SECTION 3
                     DES1CN  AND  PERFORM HCE DATA FOR OPERATIONAL  FtD  SYSTEMS
---- ............... ------ ........... ------ PERFORMANCE BAT A ----- ...... ------------- ....... ------ " ----
PERIOD MODULE  AVAILABILITY  CPERAfllim  ((LIABILITY UTILIZATION  *  REMOVAL    PER  BOILER  FED   CAP.
                                                                 S02  PART.  HOURS HOURS  HOURS  FACTO*
«••»•• •<«•••»  ««••••»»*»••  • ••••MBKMIWW  •*••>••**«*<•« «MWV*1*W»«WM »•§•»» «•*•••  »•*<••• ••• •* ^ B M •*•••!•  •••»••

       «* PROSJLEMS/SOLUT10NS/COMMENTS
              iTART DATE    6/7C      ICUIII'ENT: SLUDFE DISPOSAL
              END  frATf      6/78      PRCPttMs NOT DEFINED/SPECIFIED
                           TH6  SLUDGE SYSTEM EXPERIENCED SOMfc FILTER BELT  PROPLEHS  DURING THE MONTH
                           PbT  ThfSI KtRi  REPAIRED.
              AFFECTED  MODULES:  SYSTEM

  7/7'  A           14. ?         16.7        16.7        1A.7
       e
       SYSTEM                                                                  7**   ?<*         «8. D
              START  DATE    7/78     fcSUI CMNT: TRANSFER PUMP
              END DME      r/78     f'Roei'-i«i! NOT DEFINED/SPICIF IEB
                           PROBLEMS kfRE FNCOUNTENER WITH THE MODULE-A  TR»NSFfR PUMPS*  MINT DAYS
                           WIRE REQUIRED TO TRACE THE ELEC TRKAL -R HATED  PROBLEM.
              AFFECTED  MODULES: A

        **  PROBLEMS/SOLUTIONS/COMMINTS
              START  DATE    7/7E)     tftUIlMENT: REAGENT HANDLING
              END DATE      7/78     PRCCUtM: NOT DE FIKED/SPF CI F I ED
                           A 17-DAY OtITACf  WAS CAUSED BY PROBLEMS  UITH  THF  BALL MILL AIR SUPPLY WHICH
                           RESULTED IN Ti'f  UNA VAIL ABU 1TY OF SLURRY.
              AFFtCUD  MODULES: SYSTEM
              START DATE   7/78     t EU 1 if! EN1: ABSOPBFR
              END DATE     7/78     PPOPtTM: NOT DEFINED/SPECIFIED
                           ft-MOOULE kAS (.TILL DOWN IN JULY WHILE THE UTILITY  WAITED FOR THE REPLACE-
                           MENT EXPANFIOI  JOINT.
              AFFECTED MODULES: «

        *«  PROQLEMS/SOLUTIONS/COMMENU
              START DATE   7/78     tOUIIMENT: INSTRUMENTATION
              END DATE     7/78     PSOBlEHs NOT DE FINED/SPt CI F I ED
                           WORK WAS DONE DURING THE MONTH  TO  IMPROVE THE  INSTRUMENTATION.  IT WAS
                           D1SCOVFRED THfT MANY OF THE PROEiLbMS  WERE DUE  TO SCALE ACCUMULATION ON THE
                           PKOfiES.
              AFFECTED MODULES: SYSTEM

  8/78  A           59.0        59.0        59 . 0         59.0
        SYSTEM                                                                 744   ^^^         S4.«

        •*  PROBLEMS/SOLU1IONS/COMMEN1S
              START DATE   8/78     EeUICMENT: DUCTWORK
              END DATE     £ /78     PROBIFM: NOT DEFINED/SPECIFIED
                           Ttit FI-MODULE ftMAINEO DOWN THROU6HOUT AU6UST  BFCAUSE THE REPLACEMENT EX-
                           PANSION JOINT HAD NOT YET ARRIVED.  EXPANSION  JOINT REPAIR WAS REQUIRED ON
                           THE A-MODULE.
              AFFECTED MODULES: A      6

        **  PP06LEMS/SOLUTIONS/COMMENTS
              START DATE   R/7f     E6UIK*ENT: F6D SYSTEM, GENERAL
              END DATE     B/78     CCMMINTS:
                           TKERF WERC NO SCHEDULED OUTA6ES.
              AFFECTED MODULES: SYSTEM

        **  PROULENS/SOLUTIONS/CdMMENTS
              START DAlE   8/78     EtUIFMENT: THICKENER
              END DATE     8/78     PROBi/*: CHEMICAL-RELATED PLUGGING
                           PKOBLF.MS klTH THE THICKENER AND PLUGGED  LINES  CAUSED THE A-M08ULF OUTAGE
                           TOTALING £11 fOURS.
              AFFECTED MODULES: A

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START DATE   R/7B     ECUlr'ENT: PIPING
              END DATE     8/78     FHOBlEH: C HEMI C AL-RELA TE L PLUGGING
                                                302

-------
                                               EPA UTILITY  FGD SURVEY: DECEMBER  1978  - JANUARY 1979
                                             SECTION 3
                     DESIGN AND ff. RFORMA MCE DATA FOR OPERATIONAL F6D SYSTEMS
.........	.........	--PERFORMANCE  DATA	—	
PERIOD HODUU AVAILABILITY OPERAKILITY  FELIAB1LITY UTILIZATION  X REMOVAL   PER   BOILER  FGD   CAP.
                                                                   S02  PART.  HOURS  HOURS  HOURS FACTOR

                           PROBLEMS  VilTH THE THICKENER  AND PLU66EO LINES CAUSED  A-MODULE OUTAGES
                           TOTALING  i11  »-OURS.
              AFFECTED MODULES:  A

 9/76  A            ZJ.1         ZB.6        28.6         22.1
       B
       SYSTEM                                                                    720    557         47.6

       ** PROBLEMS/SOLUTIONS/CCWMENTS
              START DATE   9/78      EQU1IKENT:  DUCTWORK
              END DATE     9/78      PKCBiPH: NOT  DEFIN ED/SPECIF1 ED
                           CONTINUATION (F THE  EXPANSION JOINT PROBLEM RESULTED  IN THE B-MODULE RE-
                           FA IN I*lG DOWN 1HROUGHOUT  THE  flONTH.
              AFFECTED MODULES:  6

       ** PROaiEWS/SOLUTlONS/COMMENTS
              START DATE   9/7E      EQUIPMENT:  THICKENER
              END DAT?     9/78      FROBI.E-M: CHEMICAL-RELATED PLUGGING
                           A-KOOULE  DOWN TIME  HAS DUE TO PLUfc&jNG  OF THE THICKENER SLURRY MAKEUP
                           LINE? AND FAILURE OF THE  BALLS WITHIN THE MODULE.
              AFFECTED MODULES;  A

        **  PROBLEMS/SOLUTIONS/CCMMENTS
              START DATE   9/78      tfllll f PENT:  ABSORBFR
              END DATE     9/78      PROBiEn: DESIGN-RELATED INFERIOR CONSTRUCTION  MATERIAL
                           A-NODULE  tALL5  FAILED  OVER THE PERIOD-  THE HEAV IEp-WALLED PING PONG BALLS
                           ThAT  WfRE INSTALLED  DURING THE DECEMBER 1977-JANUARY  197E PERIOD WERE: RE-
                            PLACED  HITH  1 .?5  INCH DIAMFTER SOLID RUBBER BALLS DURING SEPTEMBER 1.
              AFFECTED  MODULES: A

        *•  PROBLEMS/SOLUTIONS/COMMEN1S
              START DATE   10/78     tOUI»*ENT:  FGD SYSTEM,  GENERAL
              END  DATE     1C/78     CCWMtNTS:
                           A  THOROUGH  CLEANING  OF THE ENTIRE  F6D  SYSTEM  OCCURRED DURING  THIS  PERIOD.
              AFFECTED  MODULES: SYSTEM

        ** PROBLEMS/SOLUTIONS/COMWENTS
              STAPT DATE   10/78     EGUIf?
-------
fPA UTILITY  FbD  SURVfY: PEtfMEn-  19?fc  -  JANUARY 1979
                                             SECTION I
                     DESIPN AND  Ff RFORMf.CE DATA FOP OPERATIONAL FGD SYSTTKS
					PERFORMANCF  BAT A	—
PERIOD  MOOULF  AVAILABILITY  OPEPAfllLITY  PLIABILITY UTILIZATION   X REMOVAL    PER   BOILER  FfiO    CAP.
                                                                   S02  PART.  HOURS HOURS  HOURS  FACTOR

                          THt  RUtEER  COATING ON HOLD TANK  AGITATORS *Nt> SLURRY  STORAGE TANK AGITATOR
                          WERE  SEFAIKFD.
              AFFECTED MODULES:  SYSTEM
 11/7?
        A
        B
        SYSTEM
?5.7
26.3
64.7
22.5
64.7
22.5
64.7
22.4
                                                            720
                                                                   716
                                                                   SO.!
        **  PROBLEMS/SOLUTIONS/COMMENTS
              ST*RT DATE  11/7E      lOUI r* ENT: BOILER-RELATED
              tND DATE    11 /78      CCPMfNTS:
                            Ttf  pOlLfR  OUlfGE LASTED 9NTO  THE  FIRST PART OF NOVEHBF.R.
              AFFFCTED MODULES:  SYSTEf
 12/7P
  1/79
              START  DATE   11/78      E GUI FfENt: FAN
              tND DATF     11/78      PPOB i E M : WE CHANIC AL-REL ATF D COMPONENT  FAILURE
                            AK  ftt  OUTAtE MS CAUSED 61  A  FAN  BEARING FAILURE  ON  MODULE B .
              AFFECTED MODULES:  Ei

        ** PROBLEI«S/SOLUT10NS/COKKENTS
              START  BATE   1C1/78      f GUI WENT: GAS DAPPER
              tND DATF     10/7R      COGENT: PREVENTIVE MAINTENANCE
                            ALL DAMPFKS WIRE SERVICED, REPAIRED  AND EXERCISED.
              AFFECTED MODULES:  SYSTEM
        A
        6
        SYSTEf
45.2
81.7
             76.2
             32.9
             76.2
             29,7
             68. 7
                                                             7*4    671
        *« PROBLEMS/SOLtJTIONS/CfllUMENTS
              START  DATE   12/7E     EOUIFMENT: PIPING
              END DATE     12/78     FKOPUM: WEATHER-RELATED  COMPONENT FAILURE
                            OKCE THf SPRA> N02?LES UERE  REPLACED FROZEN LINES  PREVENTED MODULE STARTUP
              AFFECTED  MODULES: A

        •* PROBLEHS/SOLUTIONS/COMMENTS
              START  DATE   12/78     teiiltWENT: PIPING
              END DATE     12/78     PPOBLfM: WEATHER-RELATED  COMPONENT FAILURE
                            SEVERAL LINES BROKE OR DEVELOPED LEAKS.
              AFFECTED  MODULES: SYSTEM

        ** PROBLEMS/SOLUTIOHS/COMMENTS
              START  »ATE   1?/7f     ECUIffENT: F6D  SYSTEK,  GENERAL
              END DftTE     1Z/7E     PPOBlEM: WEATHER-RELATED  COMPONENT FAILURE
                            ALL THE MAJOR OUTAGES C ftN  p.L ATTRIBUTED TO THE  COLD  WEATHER.  THE SYSTEM
                            WAS NOT DESJGf'fD WITH DUE  REGARD TO WEATHER CONDITIONS.
              AFFECTED  MODULES; SYSTEM

        « PROBLEMS/SOLUTIONS/COMMEN1S
              START  DATE   12/78     £ GUI ?<"!ENT:
              tND DATE     1?/7£     PRCPiER: CHEMICAL-RELATED PLUGGING
                            NCZZIE PLUGGACF AT THE PRES^TURATOR CAUSED OUTAGE  TIME ON ONE MODULE.
              AFfECTEO  MODULES: A

        ** PROBLEMS/SOLUTIONS/CCMMENTS
              START  DATE   12/78     fOUIIKENT: INSTRUMENTATION
              tND OATF     12/78     PPOBi£«: WEATHER-RELATED  COMPONENT FAILURE
                            OhE OR TWO NUISANCE TRIPS  WERE DUE TO FROZEN  1NSTROMENTS-
              AfFECTED  MODULES: SYSTEM
        A
        B
        SYSTEM
             47.3
                         47.3
                                      29.0
                                                                                 744   457
        ** PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE    1/79     EBUIffENT:  VALVES
              END DATE      ,>79     PROBIFM: WEATHER-RELATED COMPONENT  FAILURE
                                                  304

-------
                                             EPA UTILITY FfD SURVEY! DECEMBER 1978 - JANUARY 1«79
                                           SECTION 5
                    DESIGN AND PERFORMANCE DATA FOR OPERATIONAL F6D SYSTFflS
	.		PERFORMANCE DATA-—	----
PERIOD MODULE.AVA11APIL1TY OPERA9ILITY  «FL I At 1L1TY UTILIZATION  X REMOVAL   PER  BOILER  FPD   CAP-
                                                                S02  PART. HOURS HOURS  HOURS FACTOR

                          ONE MODULE EXffRIjNCED HAjOR ODTA6E TIME DuE TO  FROzFK VALVES.
             AFFECTED MODULES: 6

       ** PROBLEMS/SOLUT10NS/CONMENTS
             START  DATE   1/79      EQUIPMENT:  F6D  SYSTEM,  SENERAL
             END DATE     1/79      PROP.ir«:  WEATHER-RELATED  COMPONENT  FAILURE
                          FROZFN  VALVES  AND  EQUIPMENT CONTRIBUTED TO THE  oUT«6E$ OF A MODULE.
             AFFECTED MODULES: A

       ** PROBLEMS/SOLUTIONS/COMMENTS
             START  0*TE   1/79      E6UIFMENT:  REAGENT HANDLING
             END DATE     1/7,9      PKOBITM:  NOT DEFINED/SPECIFIED
                          DURING  T«l  FlhST  15  DAYS OF JANUARY  THE SECOND  BALL  MILL WAS  UNUSEA6LE
                           DIE TO  LACK  Of AIR.   THIS  CAUSED PROBLEMS  IN KFEPING  LIMF.STONE SLURRY
                           SUPPLIED  TO  THE. A-MODULE.
              AFFECTED MODULES:  A
                                                 305

-------
FPA UTILITY  FbD  SUPVFY; CECE^FFP  1  SYSTEMS
 COMPANY  NACE
 PLANT  NAKF
 UNIT NUMBER
 CITY
 STAT E
 RF6ULATORY  CLASSIFICATION
 PARTICIPATE  EMISSION LIMITATION  - KC/J
 SOZ  EMISSION  LIMITATION -  NC/J
 NfT  PLANT GENERATING CAPACITY  -  MW
 GROSS  UNIT  CENERATING CAPACITY  - MV
 NET  UNIT GENERATING CAPACITY  V/F6D - K !
 NET  UNIT GENERATING CAPACITY  KO/FGD  - I
 E8UIVALFNT  SCRUBBED CAPACITY  -  Py
TENNFSSEE  V AL L E t AUTHORITY
SHAWNEE

PADUCAH
KENTUCKY
C
  516.
 1750.0
   10.0
   10.0

   1D.O
                (  .100 LP/MMETU)
                ( 1.ZOO LP/MMBTU)
  **  tOILFR DATA
      SUPPLIER                                    ******
      TYPE                                         BASE
      SERVICE LOAD                                •****«
      COMMERCIAL SERVICE  CiATE                     **/**
      KAKIKUH BOILER  FLUE  6AS  FLOW - CU-^/S      *****•«•
      FLUF  EAS TE1PERATURF  -  C                   *******
      STACK Hf 1GHT  -  «                            ******
      STACK TOP  OIAFCTER  -  f                      *******
                (**•*•** *CF«>
                (**** F)
                <**** FT)
                (***** FT)
  ** FUEL DATA
      FUEl TYFE
      fUEl CRAOE
      AVERAGE HEAT  CONTENT  - KJ/KG
      SANGE HEAT  CONTENT  -  PTU/LB
      AVERAGE AsH CONTENT - X
      RANGE ASH  CONTENT  - *
      AVERAGE MOISTURE  CONTENT - *
      RANGE MOISTURE  CONTENT - X
      AVEFAGE SULFUR  CONTENT - JT
      RANGE SULFUR  CONTENT  - X
      AVERAGE CHLORIDE  CONTENT - X
      RANGE CHLORIDE  CONTENT - *
      FUEl f 1RIN6 RATE  -  f.  T /H
      FUEl FIRING RATf  -  MW

  ** FtD  SYSTEM
      SALEABLE PRO DUCT/T HR 0V AWAY PROOUCT
      GENERAL PROCESS TYPf
      PROCESS TYPF
      SYSTEM SUPPLIER
      A-£  FIRM
      CONSTRUCTION  FIRIH
      DEVELOPMENT LEVEL
      NEW/RETROFIT
      INITIAL STAPT-UP

  ** ABSORBFR
      TYpF
      INITIAL START UP
      SUPPLIER
      NUMEER OF  STAGES
      6AS  FLOW -  CU.H/S
      6AS  TEMPERATURE - C
      PARTICULATE INLET LOAD - 6/CU.I*
      SOZ  INLET  CONCENTRATIOfc -  PPM

  •* MIST  ELIMINATOR
      NUMBER
      TYPF
      HASH SYSTEM

  ** REHEATFR
      TYPE
COAL
BITUMINOUS
* *******
***** *
***** ***
* *****
     2.90
                (****** 8TU/LR)
                 ******
***** ***
******
                {*** TPH)
THROWAWAY  PRODUCT
yET  SCRUBBING
AIR  CORRECTION DIVISION,  UOP
BECHTEL
TVA
PROTOTYPE
RETROFIT
  4/7?
 TURBULENT CONTACT ABSORBF, F!
 AIR  CORRECTION DIVISION,  UOP
    U.16
   UP.9
     6.9
  2900
C  30000 ACFH)
(  300 F>
( 3.000 GP/SCF)
 CHEVRON
 INTERMITTENT WASHING  KITH  AVAILABLE RAU WATER
                                                   DIRECT COMBUSTION
                                                  306

-------
                                             EPA UTILITY F66 SURVEY! DECEMBER 1978 - JANUAR.Y 1979
                                           SECTION 3
                    DIS16N AND PERFOSMKE DATA FOR OPERATIONAL FED SYSTtHS
	....	.........	.	.	.PERFORMANCE DMA----- — — —---	........	....
PERIOD MODULE AVAILABILITY OPERA01L1TY  fELIARILITY UTILIZATION  X REMOVAL   PER  BOILER  F6D   CAP.
                                                                S02  PART. HOURS HOURS  HOURS FACTOR


 0/79  SVSTE.M

       •* PRQBLEMS/SOLUTIONS/COKHIENTS
             START DATE   0/72      CQUIfWENTl  FGD  SVSTfMt  6INE»«L
             {NO DAT!     0/79      CCMMMTSj
                          REFER TO  riKrCRMANCE  UPDATE INFORMATION FOR  IHAWNEE 108.
             AFFECTED HODULtS: SYSTEf
                                                 307

-------
CPA UTILITY Fi,6 SUmY:  6ECLMBFR 197' - JANUARY 1979
                                            SfcCTjON  3
                     DESIGN AND PfcRFOflMAKE DATA FOR OPERATIONAL FGD SYSTEMS
 COMPANY NAME
 PLANT  NAMf
 UMT NUMBER
 CITY
 STATE
 REGULATORY  CLASSIFICATION
 PARTICIPATE  EMISSION  LIMITATION - KC-./J
 SOi1  EMISSION  LIMITATION - Kt/J
 NET  PLANT  GENERATING  CAPACITY - MW
 GROSS  UNIT  ttNERATING CAPACITY - Kk
 NFT  UNIT GEIvCRATIK'G CAPACITY W/FGD - Mt
 NET  UNIT GENERATING CAPACITY WO/F60 -  "M
 E6U1VALFNT  SCRUPBED CAPACITY - MW
TENNFSSEE VM.IEY  AUTHORITY
SHAUNEE
TOP
PADUCAH
KENTUCKY
   1,7.
  51*.
 1750.0
   10.0
   10.0
*******
   10.0
(  .100 LP/MMBTU)
( 1.ZOO LFi/MHBTU>
  **  eOILFR  DATA
      SUPPLIER
      TYPE
      SERVICt LOAD
      COMMERCIAL SERVICE DATE
      MAXIMUf EiOlLER FLUt GAS FLOW - CU.f/S
      FLUE  GAS  TEHPFRATURt - C
      STACK  HEIGHT . I*
      STACK  TOP DIAMETER - M

  •*  FUEL DATA
      FUEL  TYFC
      FUEL  GRADE
      AVERAGE HEAT CONTENT - Kj/KG
      RANCE  HEAT CONTENT - iHU/LB
      AVE»AEE ASH CONTENT -  I
      RANCE  ASH CONTENT - X
      AVERAGE MOISTURE CONTENT - !
      RANCE  K01STIIRE CONTTNT - *
      AVERAGE SULFUR CONTENT - it
      RAN(sf  SULFUR CONTENT - X
      AVERAGE CHLORIDE CONTFhT - g
      RANCf  CHLORIDE CONTfNT - X
      FUEl  FIRING RATE - K T/H
      FUEL  F IR1NG RATE - MU

  **  PARTTCULATE SCRUBEtER
      TYPI
      SUPPLIER
      FLU6 6AS CAPACITY  -  CU.P/S
      FLUF SAS Ttl-PEKATURE  .  C

  ** F6D SYSTEM
      SALEABLE PRODUCT/T HROW ANAY  PRODUCT
      CEhfRAL PROCESS TYPE
      PROCESS TYPE
      SYSTEM SUPPLIER
      A-E FIRM
      CONSTRUCTION  FIRM
      DEVELOPMENT LFVFL
      kEM/RETftOFIT
      INITIAL START-UP
      NUMPER
      TYPE
      INITIAL START UP
      SUPPLIER
      GAS FLOW . CU.M/S
      GAS TEMPERATURE -  C

  ** MIST ELIMINATOR
      NUMBER

  ** REHEATER
      TYpF
***** *
BASE
******
**/**

***** **
******
***** **
COAL
BITUMINOUS
«******

********
******
********
******
    7.90
******
********
******
*******
*****
 1
VENTURI
CHFMICO
    U.2
   HP.9
(<******* ACFM)"
<«*** F)
(**** FT)
(***** FT)
(****** BTU/LB)
 ******
(*** TPH>
(  30000
(  300 F)
           PRODUCT
WET  stftueeiNG
LIME/LIMESTONE
CHFMICO
ElECHTEL
TVA
PROTOTYPE
RETROFIT
  4/7?
  1
 SPRAY  TOUEP
  4/72
 CHEMIcO
    14.16
(  30000 ACFM)
<  300  F)
 DIRECT COMPLETION
                                                 308

-------
                                              EPA UTILITY FCC SURVEY: DECEMBER 1978 - JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PERFORMANCE  DATA FOR OPERATIONAL FED SYSTEMS
.. ------- . -------------------------------- PERFORBANCF DATA --------------------------------- . ________
PERIOD MODULE AVAILABILITY  OPERAB1LITY  ^LIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FGO   CAP.
                                                                 S02  PART. HOURS HOURS  HOURS FACTOR


 0/72  SYSTEM

       ** PR06LEMS/SOLUTIONS/COMMENTJ
             START DATE    0/72      IBUlrMENT: F6D SYSTEM, GENERAL
             END DATE      0/72      COMMENTS: RESEARCH AND DEVELOPMENT
                               IK  JUhF 1>;68, THE EPA INITIATED A PROGRAM TO TEST PROTOTYPE LIME AND
                           LIMESTONE SYSTEMS FOR REMOVAL OF SULFUR DIOXIDE AND PARTICULATE FROM COAL-
                           FIRED POILEK  HUE GASES. THE PROGRAM WAS CARRIED OUT IK A TEST FACILITY
                           INCORPORATED  IK TO THE FLUE GAS DUCTWORK OF UNIT NO. 10, A COAL-FIRED BOIL-
                           ER AT THE TVA SHAWNEE POWER STATION, PADUCAH, KENTUCKY. TVA is THF CON-
                           STRUCTION AND FACILITY OPERATOR AND BECHTEL CORP- IS CONTRACTOR, TEST
                           0 1RECTOR AMD- f-EPORT WRITER.
                               THE TtST  FACILITY CONSISTS OF THREE PARALLEL SCRUBBER SYSTEMS Of PRQ-
                           TCTYPE  SIZE,  1REATING PART OF THE FLUE CAS FROM THE BOILER. EACH SCRUbPtP
                           TRAIN  IS CAPAUE OF TREATING APPROXIMATELY 30,000 *CF« OR THE EQUIVALENT
                           OF AppRoXIMATILY 10 MW OF POWER PLANT GENERATING CAPACITY.
                               THREE PARALLEL W£T SCRUBBtR SYSTEMS WEPE SELECTED FOR THE TEfT PRO-
                           JECT:  1) A VENTURI WITH A SPRAY TOWER AFTER ABSORBER, ?> A TURBULENT CON-
                           TACT  ABSORBER OCA), AND J) A MARBLE-BED APSORBER. THE VENTUR1 SYSTEM,
                           MANUFACTURED  I.Y CHEMICAL CONSTRUCTION CO., CONTAINS AN ADJUSTABLE THROAT
                           TMT  PFRMITS  CONTROL AND VARIATION OF PRESSURE DROP OVER A WIDE RANGE OF
                           FLOW  CONDITION. THfc TC A UNIT, M ANUF A CTURE5 PY UNIVERSAL OIL PRODUCTS,
                           INCORPORATES  A FLUIDIZED BfD OF LOW DENSITY PLASTIC SPHERES THAT ARE FREE
                           TC MOVE PETWE'N RETAINING GRIDE. THE MAR6LF BED AiSORBfR, SUPPLIED BY
                           coHiUSTieh ENGINEERING co., USES A PACKING OF *-*-JNCH GLASS MARBLE
                           SPHERES AM, n TURBULfNT LAYER OF LIQUID AND GAS APOvT THE MARBLE LAYFR TO
                           IKHANCi MASS  1RANSFFR.
                               IN  JUM 1<74, THE EPA PE6AN A 3-YEAR ADVANCED TiST PFOpRAM AT THF
                           SfrAWNEt FACILHY WITH THFSf MAJOR GOALS: (1) CONTINUATION OF LONG-TERM
                           TfSTING, WITH ERPHASIS PLACED UPON THE RiLIASLi OPERATION OF MIST ELIMINA-
                           TION  &YsTt»«S  H INCREASID 6AS VELOCITY, (2) INVESTIGATION OF ADVANCIO PHO-
                           CiSS  AND teUIIftNT DESjGN VARIATIONS FOR IMPROVING EQUIPMENT RELIABILITY
                           AKD PROCFSS ECONOHICS, AND  (3> LONG-TERM RELIABILITY TESTING ON pROMlsiNS
                           PKOCESS AM) ItUIPHINT DESIGN VARIATIONS.
                               THE TWO P*RALL!L SCRUIB1N6 SYSTEMS OPERATING DURING THE ADVANCfD PRO-
                           GRAM  APE THE  ViNTURl/SPRAY TOUER SYSTEM AND THE TCA UNIT. GENERAL PROCESS
                           FLOW DIAGRAMS OF THI TWO PROTOTYPE UNITS ARC PROVIDED IN APPENDIX P. OPEP-
                           A TION OF  THE f' A R&L f -B6 D AFEORS-IB UNIT HAS IEIN PERMANENTLY DISCONTINUED.
                               EACH Of  Tff SCRUBBING  SYSTEMS CONTAINS ITS OWN SLURRY HANDLING FACIL-
                           ITIES AND  CAN TREAT  APPROXIMATELY SO, 000 ACFM OF GAS AT 300 F CONTAINING
                           1SPO TO 4(.'00 IPM OF  SULFUR  DIOXIDE AND ? TO t ERA1NS/SCF OF PARTICULATE.
                           ffllLFR NO. 1  FORMALLY HURNS  A HIGH-SULFUR  BITUMINOUS COAL.
                               FROM JUNE 1974 TO JANUARY  1976, MIST ELIMINATION AND LIMESTONE UTILI-
                           ZATION TFSTS hERE  CONDUCTED  AT THE SHAWNEE FACILITY. DURING THIS TEST PER-
                           IOD THE VENTUH1 /SPRAY TOWER.  SYSTEM WAS OPERATED ON BOTH LIME AND LIMESTONE
                           AND THE TCA  S1STEM WITH  LIMiSTONF. TESTING WAS PERFOSMfD UNDER A CLOSED-
                           WATER OPERATICN MODE. DURIN6 THIS PERIOD THE SLURRY  SOLIDS  CONTAINED AP-
                           PROXIMATELY  tC  TO  50 P6RCENT-BY-VEI6HT  FLY ASH BECAUSE  OF RELATIVELY HIGH
                           GAS INLET  PARIKULATI LOADING.  THIS TESTING PR06PA*  IS  SCHEDULED TO RUN
                           THROUGH TC FE'liUARY  1978.

                               ADDITIONAL  INFORMATION  AND  DATA CONCERNING THE! DETAILS  OF  THE ADVANCfD
                           TEST PROGRAM fPE PRfSENTFD  IN  THF PERFORMANCE TABLF.  THAT FOLLOWS.
              AFFECTED MODULES: SYSTEM

  9/75  SYSTEM                                                                 7*°

        ** PROBLEMS/SOLUTIONS/COMWENTS
              START DATE   9/75     fcCUilPENT:  F6D  SYSTEM,  GENERAL
              END DATE    10/75     COdWiNTS: RESEARCH  AND  PIViLOPfENT
                           TMS EXPFHHMTAL  EPA-FUNDFD OPERATION  IS  PROCEEDING WITH  THE  TEST  PROGRAM
                           TWO ABSORfifR fODULES ARE CURRENTLY OPERATIONAL  (10 MW  fACH).  THE  MARPLE-PE
                           AbSORBTR IS  STILL  INOPERATIVE  (SINCE  JULY  1973).  CURRENT  EXPERIMENTS  ARE
                           RtLATF.D  TC MlfT  ELIMINATOR  SECTION.
              AFFFCTED MODULES: SYSTEM

 '0/75
                                                 309

-------
EPA UTILITY r&D SUPVET; OEClClifR  197f  -  JANUARY 1979
                                            SECTION I
                            *NO  PFSF OfM M f.  DATA FO*1  OPERATIONAL F 6 D SYSTFMS
. ----- .. ---------- ..... --------- - ----- ----PUFORi'lANCr  DATA----- — -— —"—•---- --------- .. — . — .. — ...
PERIOD MODULE AVAILABILITY  OPERAEHITY  ^LIABILITY  UTlLifATlCN  X REMOVAL   PER  BOILER   fCD   CAP.
                                                                 SO!;  PART. HOURS HOURS   HOURS 'ACTOR


11/7?  SYSTEM                                                                 720

       • •  PRO tL(MS/SOLUTIONS/COM MtN'T£
             START  CAT!   11/75      IfililflNTi  F66  SYS1|M, 6iN|RAL
             tM)  D*TC     1?/7*      tfM»MNTSj  SFSfARCH  AND DIVILOPMINT
                           KtCJNT TI8TIN4  AT SHAWNtt HAS SHOhN THAT THt CHIVRON MIST ELIMINATOR! IN
                           E-CTH  THE  SPRA>  TOUf.fi  AND  THE TC A CAN S( KEPT Mil OF SOLIDS BUILHIP IT HIG
                           ALKALI UTH1ZH10N  (6REATER  1HAN 40 PtfiCtNT), USING ONLY INTERS I T TANT
                           WASHIMfi  WITH    TfST-
                           iKe THE  OXIDATION of  suu&si  TO (JYPSUW IN THE VFNTURI/SPRAY TOWER  SYSTEM
                           USING AIR SPAFCING  OF AN  ACKJflED SLURRY BLEED STREAM.
             AFFtCTED  MODUltE:  SYSTrP"

12/75  SYSTEM                                                                 7*4

  1/76  SYSTEM                                                                 744
              START  DATE    1/76     IOUI!«EMT:  F60  SYSTEM, GENERAL
              tNC OATT      2/76     COfM tNTSs RESEARCH AND DEVELOPMENT
                           THE ADVANCED  If ST PR06RAM IS CONTINUING. HIGHLIGHTS OF THE  PROeR'K  ARE  AS
                           FCLLObS:
                           EVALUATE  scRUtnER OPERABILITY DURING VARIABLE LOAD OPERATION.
                           CONTINUE  LCAG-TERM RELIABILITY TESTING.
                           IKyESTlGATF  MHHODS  FOR  IMPROVING HASTE SOLIDS SEPARATION.
                           CONTINUE  SLUDtf:  OXIDATION AND SLUDGE FIXATION STUDY PROGRAMS.
                           EVALUATE  SYSTtP  PERFORMANCE AT RFDUCfD FLY ASH LOADIN6.
                           DETERMINE THl PRACTICAL  UPPER LIMITS OF SO? REMOVAL EFFICIENCY.
                           EVALUATE  ADD] II ON OF MAGNESIUM 10K TO THE SCRUBBING SLURRY.
                           CHARACTERIZE  'it STACK GAS EMISSION COMPONENTS.
                           EVALUATE  MTfUALS OF CONSTRUCTION OF ALL SCRUBBER AND PLANT-RELATED
                           CCMPONENTS.
                           DtVELOPE  A COPPUTiR  PR06RAH FOR 6ISI6N AND COST ANALYSIS  OF  FULL-SCALE
                           LIME/LIMESTONt:  SYSTEM.
              AFFECTED  MQDULEs: Sl'STtf

  2/76   SYSTEM                                                                696

  3/76   SYSTEM                                                                744

        **  PROULEMS/SOLUTIONS/COKMIN1S
              START  DATE    3/76     IQUIfMENT:  FGD  SYSTIM, StNiRAL
              6ND DATF      t/?6     COMH-NTSl RESEARCH AND DEVELOPMENT
                           PtCHTEL RtPORlFD THAT THF FACTORIAL TEST PR06RAM, IVALUATIN6  THE  PERFOR-
                           MANCE OF  THl  UM1/L1MISTQNT SCRUBBING SYST|MS WjTH AND WITHOUT HA6NES1UK
                           ADDITION  HAS  tfEN COMPLETED. CURRENTLY TESMN6 IS PROCEED1N6  ON  THE EVALUA
                           TION OF SYSTE"  PERFORMANCE AS A FUNCTION OF LOW RESIDENCE  TIMES  (1.5  TO S.
                           MINUTES)  IN  T»ii  RE-CYCLE  TANKS, IN ADDITION, A FLY ASH-FRFI  DUCT  IS  BEING
                           INSTALLED Al  THE TEST FACILITY, THUS ENABLING EVALUATION  OF  SYSTFH  PERFOR-
                           MANCF IN  THE  ^SfNCE OF  FLY ASH.
              AFFECTED  MODULES: SYSTEM

  */76   SYSTEM                                                                ?20

  5/76   SYSTEM                                                                744

        **  PROBtEwS/SOLUTIONs/COMMENTS
              START  DATE    5/76     tOUIFMENT:  F6D  SYSTEM. SfNERAl
              END OATE      6/76     COMWtNTS: RESEARCH AND DEVELOPMENT
                           THE TEST  OlREtTOR, BECHTFL, PROVIDED THE FOLLOWING INPUT  CONCERNING THE
                                                310

-------
                                               EPA  UTILITY IFGD SURVEY: DECEMBER  1978  -  JANUARY 1979
                                             SECTION 3
                     DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL FGD SYSTEMS
..	.	PERFORMANCF DATA	•	
PERIOD WODULF AVAILABILITY OPERAB1LITY  PLIABILITY UTILIZATION  X REMOVAL    PER   BOILER   FE6   CAP.
                                                                  SO?   PART.  HOURS  HOURS  HOURS  FACTOR

                           OPERATION OF  THE  EXPERIMENTAL SCRUBBING SYSTEMS  OURIN6  THE REPORT  PERIOD.

                           THE EFFECT  CF  M60 ADDITION WAS EXPLORED IN  BOTH  SCRUBBER  SYSTEMS.  RESOLTS
                           INDICATE HAGNt'SIUH ION IN THE SCRUBBER SLURRY  L1BUOR  ENHANCES  SO?  REMOVAL
                           AI\D CAN DEPRESS  SULFATE SUPE RSATURAT1 ON .  IT  WAS  FOUND THAT THE MAGNESIUM
                           ICN CONCENTRATION HAD TO EXCEED THE  EUUIVALENT CHLORIDE ION CONCENTRATION
                           TC HAVF, AN  EFfFCT ON S02 REMOVAL.
                           i* THE TCA  UNIT,  WITH LIMESTONE SLURRY, soz  REMOVAL WAS INCREASED  FROM 75
                           TO 95 PERCENT  PY  INCREASING THF MAGNESIUM  ION  CONCENTRATION TO 9,000 PPM
                           It, EXCESS OF  FOUIVALENT EQUAL TO  6 PERCENT  BY  WEIGHT  Of THE LIMESTONE AD-
                           DITION RATE.  IN  THE VENTURI/S PR AY TOWER SYSTEM,  WITH  LIME  SLURRY,  SO? RE-
                           MOVAL WAS INCFFASED FROM 75 TO 90 PERCENT  BY INCREASING THE MAGNESIUM ION
                           CONCENTRATION  TO  ?,'000 PPM.IN EXCfcSS  OF EQUIVALENT CHLORIDE TON. THE'MAG-
                           NESlUM OXIDl  ADDITION RATE uAS 2  PERCENT 6Y  WEIGHT OF THE  LIME ADDITION
                           RATE. BOTH  SCRUBBING SYSTEMS OPfcRATED IN  THE SUBS*TURATED  SUlFATE  MODE
                           wdEN MAGNESIUM OXIDE WAS ADDED* INLET soz  CONCENTRATIONS  DURING THE  TESTS
                           AVERACF APPKOJIMATELY 3,000 PPM DURING  THESE TESTS.
                           FOLLOWING THE  TEST BLOCKS MENTIONED  ABOVE,  BOTH  SCRUBBERS  ARE  OPERATING
                           WITH LIMf SLURRY SCRUBBING SOLUTIONS, THE  TCA  SYSTEM  ON FLUE GAS CONTAIN-
                           IlvG  FLY ASH A ftp  THE VENTURI/S PR AY TOWER SYSTEM ON FLY ASH-FREE FLUE  GAS.
              AFFfCTED MOOUlES: SYSTEM

  6/76  SYSTEM                                                                  7?0

  7/76  SYSTEM                                                                  744

        **  PROBLEMS/SOLUTI ONS/COMMENTS
              START DATE   7/76      EGblf'MENI: FGD SYSTEM, GENERAL
              END DATE     B/76      COMMENTS: RESEARCH AND DEVELOPMENT
                           EXPEPIMfNTAL  CPERATION Or THE EPA/TV* ALKALI SCRUBBING  TEST FACILITY CON-
                           TINUED  DURING  THE REPORT PERIOD.  B^CHTEL,  THE  TEST DIRECTOR, PROVIDED THE
                           FCLLOWING  1NPIT CONCERNING THE OPERATION  OF  THE  PROTOTYPE  TEST UNITS.
                           VENTURI/SFSAY  TOWER SYSTEM: THIS  SYSTEM  RAN  OFF  FLY  ASH-FRFE FLUE  6AS USIN
                           A  LIME  SLUPKY  SCRUBBING SOLUTION. NO SIGNIFICANT DIFFERENCES IN $02  REMOV-
                           AL,  GYPSUM  SATURATION AND  SULflTE OXIDATION WERE DETECTED  (VERSUS  FLY ASH-
                           LADEN  FLUE  GAi). ONE  DIFFERENCE NOTED WAS THE FILTER  LAKE  SOLIDS CONTENT
                           VhlCH  WAS  AFPIOXIMATELY 10 PERCENT LOKER  FOR THE FLY  ASH-f»EE  SLUDGE 140
                           TC  50  PERCENT SOLIDS)VERSUS THE  FLY  ASH-LADEN SLUD6E  150  TO 60 PERCENT
                           SOLIDS.  IN  ADUTION OPERATION  IN  A LOW  RESIDENCE TIME MOD E< 3MINUTES)WAS
                           EXPLORED.  SCAIf-FREE  OP£RAT]ON WAS ACHIEVED IN THIS  MODE  UNDER THk FOLLOW-
                           ING  CONDITIONS: 8 PERCENT  SOLIDS  (NO FLY  ASH) IN THE  Rr Cl RCULATED  SLtlRRY,
                           PK  OF  THF  SCRIFBER LIOUID  INLET  WAS  8.0,  SUPERFICIAL GAS  VELOCITY  OF 9.4
                           FT/SEC.,  AND  H TOTAL  LIQUID.TO-6AS RATIO  (1-6) OF 7.1 GAL/MCF. SOME  SCALE
                           FC"M«TION  OCCIBRED WHEN THF  SOLIDS CONTENT or THE RECJ.RCULATED SLURRY
                           DROPPED  BtLOW THE * PERCENT  LEVEL-
                           TCA  SYSTEM: TWIS  SYSTEM OPERATED  ON  FLY  ASH-LADEN FLUE  BAS USING A LIME
                           SLURRY  SCRUtBJ!»6  SOLUTION  INNOCULATEO WITH MAGNESIUM  OXIDE. SYPSUfl StleS*''-
                           URATION  OPERATION WAS ACHIEVED UNDER THE  FOLLOWING CONDITIONS: MAGNESIUM
                           UN  CONCENTRATION EXCEEDED  THE CHLORIDE 10N CONCENTRATION BY  2000 PPM,  SU-
                           PERFICIAL  GAS VELOCITY  W*S  12.5  FT/SEC.,  L/6 WAS 50.  THf   SCRUBBIN6 SOLU-
                           TION  INLET  PH WAS 7.0,  AND  RESIDENCE TIME WAS 4 MINUTES.  THE  S02 REMOVAL
                           EFFICIENCY  M ! APPROXIMATELY  90  PERCENT.  WHEN L/G WAS  REDUCED TO 37,  WHILE
                           ALL  OTHER  CONIITIONS  REMAINED  CONSTANT, SEVERE GYPSUM  SCALE FORMATION  RE-
                           SILTED  INCHIA'ING THE EFFECTIVE  MAGNESIUM CONCENTRATION TO 4000 PPM AND
                           TfcE  SCRUPbFP  LIQUID  INLET  PH  TO  f! .0  DID NOT AMELIORATE THE  SCALE PROBLEM.
                           PkESFNTLY  THE VENTURI/SPRAv  TOWER SYSTEM  IS OPERATING  ON  FLY  ASH-FREE  FLUE
                           GAS  WITH  KAtNiSIUH OX1DE-1NNOCULATED LIME SCRUBBING SLURRY-
              AFFECTED MODULES:  SYSTIM

  6/7ft  SYSTEM                                                                  744

  9/76  SYSTEM                                                                  7?0

        ** PROtJLEMS/SOLUIIONS/COWENTS
              START DATE   9/76      E«UIH«ENT:  FGD  SYSTEM,  GENERAL
              END DATE     10/76      CCMMLNTS: RESEARCH  Aht>  DEVELOPMENT
                            It, SEPTEMBER  Mit  OCTOBER  1o?6  THE VEN TU RI/SPRAY  SYSTEM WAS OPERATED  WITH
                                                  311

-------
EPA UTILITY FKD  SURVEY:  DtCtKPFFi 197f - JANUARY  19'9
                                             SECTION  3
                     DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL F6D SYSTEMS
	—	---	-PERFORMANCE  DATA	.........	
PERIOD MODULE  AVAILABILITY OPERAIUL1TY  iTLlAMLlTY  UTILIZATION  X REMOVAL    PER   BOILER  F6D   CAP.
                                                                  SO?  PART.  HOURS HOURS  HOURS  FACTOR

                           FLY ASH-FPft  HUE G»S  USjNfi  LlKlE SLURRY WITH ADDED MGO TYPICAL
                           TEST CONDITIONS  WERE 9.4  FT/SEC SPRAY TOWER 6A$  V|LOC1TY, ?1 GAL/«Cf VENTU
                           HI L/6, 51 6AI/MCF  SPRY  TOUER L/E, g PERCENT SLURRY SOLIDS (FLY ASH  FREE)*
                           3 MINUTES RESIDENCE  TIME, 7.0 SCRUBBER INLET PH,  AND 2000 PPM EFFECTIVE
                           MAGNESIUM ION CONCENTRATION  d.F.f EXCESS OVER  EQUIVALENT CHLORIDE ION).
                           RhSULTS WERE  KOT CONSISTENT  AT THESE CONDITIONS.  DURING  ONE PERIOD,  SCRUB-
                           BINS INLET LIUJOR GYPSUM  SATURATION AVERAGED 85  PERCENT  WITH 80 pERCFNT 50
                           RtROVAl WITH  !OME GYPSUM  SCALS FORMATION. IN A  LATFR PERIOD, AT SEEMINGLY
                           1DTNT1CAL TE.S1 CONDITIONS GYPSUM SATURATIONS DROPPED TO  10 PERCENT   WITH 9
                           PERCENT Si'.2 R.'KOtfAL  AND  THF  SCRUBBER DESCALED.  A  SEVEN-MEEK PROGRAM  OF IN-
                           TENSIVE FLUE  kAS CHARACTERIZATION TESTING VAS STARTED  IN MID-OCTOBER ON
                           TKE VfNTURI/SHVAY TOWER  SYSTEM. THESE TESTS ARF  BEIN6  HADE TO MEASURE
                           SlMUtATANtOUS INLET  AND  OUTLET FLUE GAS PARTICIPATE  MASS LOADINGt PARTT-
                           CULATE S17E DISTRIBUTION  AND 6ASEOUS So3 CONCENTRATION.  THF TCA SYSTEM
                           CONTINUED TO  fPERATE DURING  THIS PERIOD ON FLY  ASH-LADEN FLUE 6AS USING
                           LIME SLURRY WITH ADDED MGO.THE TEST RESULTS SO  FAR INDICATED THAT THE
                           DEGREE OF SUl IA TE (6 YFSUM )S ATURAT I ON IS A SENSITIVE FUNCTION OF THE
                           EFFLUENT  RESIDENCE  TIME  CONDITIONSrGAS VELOCITY  12.5 FT/SEC, L/6 OF  50, PH
                           Of 7.0, JCDO  IPM OF  HG ION,  AND R PERCENT SOLIDS. AT THESE CONDITIONS
                           GYPSl'f SATURATION WERE 95,50,AND 92 PERCENT,AT  RESIDENCE TIMES OF 3,4,AND
                           12 MINUTES,RESPECTIVELY.FURTHER TESTS WERE RUN  AT 17 GAL/MCF L/6,AND 8.0
                           INLET PH  UTH OTHER  CONDITIONS THE SAME. DURING  THESE  TESTS GYpSUM SATURA-
                           TIONS WERE 95, 95,  50, AND 90 PERCENT AT 3, 4,  5.4, AND  16 MINUTES RESI-
                           DENCE TIMES,  lESPECTIVELY.
              AFFECTED MODULES: SYSTtP

10/76  SYSTEM                                                                  744

11/76  SYSTEM                                                                  720

        **  PROfcLEMS/SOLUTIONS/CCMMENTS
              START DATE   11/76      tGUIFWENT:  FGD  SYSTEM, GENERAL
              END DATE     12/76      COHHS.NTS!  RESEARCH  ANt> DEVELOPMtNT
                           FROM MIo-CtTOffR THROUGH  EARLY DECEMBER AN INTENSIVE FLUE GAS CHARACTERI-
                           ZATION TESTING PROGRAM  WAS CONDUCTED ON THE VENTURl/SPRAY TOWEft SYSTEM
                           WITH LIME SLUUK'Y. OVER THE RANGE TESTED, OUTLET  PARTICIPATE MASS LOADING
                           HAS FOUND TO  !F  INDEPENDFNT  OF SLURRY COMPOSITION S, 3,000  TO 16,000 PPM DISSOLVED  SOLIDS), GAS FLOW RATE
                            (20,CCO TO 35,000,  ACFH>» SPRAY TOWER LlflUIO RATE Co TO  1,400 GPCO ANB
                           VtNTURI PRESStRE DROP  (3  TO  9 INCHES HZO). WITH  4 TO 6 6R/OSCF PARTICULAT£
                           IK THE IMFT  lYpicAi OUTLET  LOADINGS WERE 0.02  TO 0.04 GR/DSCF. WHEN OPER-
                           ATING WITH FLIF  GftS  FROM  THE ELECTROSTATIC PRECIPUATOR  (0.1 TO 0.4
                           GR/OSCF TO THt SCRUBBER), THE SCRUBBER OUTLET LOADING  AVERAGED 0.005
                           GR/DSCF.  THUS. ENTRAINED  SLURRY FROM THE M.E. PUST HAVE  BEEN LESS THAN
                           0 .OOSGR/DSCf. SIZE  DISTRIBUTION DATA ARE STILL  BEING ANALYZED. SULFURIC
                           ACID MIST VALUS WERE  APPROXIMATELY 2 TO 25 PPM  AT THE SCRUBBER INLET AND
                           REMOVALS  HAVE BEEN  ABOUT  so  TO 75 PERCENT.
                           THE REMAINDER OF DECEMBER THE VENTURIJSPR AY TOWER SYSTEM WAS DOWN FOR MOD-
                           IFICATIONS fOR TWO-STAGE  OXIDATION TESTING. SEE  APPENDIX 6 FOR A PRflCESS
                           FLOW DIAGRAM.
                           HRIN6 NOVFMBtR  THE  TCA  WAS  OPERATING WITH FtY  ASH-CONTAlNlNG FLOE GAS US-
                           IHG LIME  SLURRY  WITHOUT  ADDED MAGNESIUM OXIDE.  OPERATING CONDITIONS  VERE
                           12.5 FT/StC G;j  VELOCITY, 50 6AL/KCF L/G, 8.0 SCRUBBER INLET PH, AND 8 TO
                             15 PERCENT SLURRY  SOLIDS.  AT THESE CONDITIONS  THF. SO?  REMOVAL WAS  ABOUT
                           PERCENT.
                             FLY ASH-FREE LIMESTONE  T£STS WITHOUT MAGNESIUM  OXIDE  ADDITION BEGAN ON TH
                           TCA SYSTEC IN LATE  NOVEMBEP.  TYPICAL OPERATING  CONDITIONS WERE 12.5 FT/SE
                           GAS VELOCITY, SO GAL/MCF  L/6, AND 1.1 TO 1.3 STOICHIOHETR1C RATIO.   AT THE
                           SAKE STOICHIO^FTRY,  THE  PH OF THE FLY ASH-FREE  SLURRY WAS 0.2 TO C.3 UNITS
                           H1£HER THAN OB IERVED  IN PREVIOUS RUNS WITH FLY ASH.
              AFFECTED MODULES: SYSTEM

12/7t   SYSTEM                                                                  7(U

  1/77  SYSTEM                                                                  ll>lt

        »*  PROoLEMS/SOLUTIONS/Cni»KENTf
              START DATE   7/77      EQUIIPENT:  FGD  SYSTEM, GENERAL
              END DATE     2/77      COMMITS:  RESEARCH  AND DEVELOPMENT


                                                312

-------
                                              EPA UTILITY FGH SURVEY:  DECEMBER  1978  -  JANUARY  1«79
                                            SECTION 3
                    DESIGN  AND  PFRFOFt.AKE DATA FOR OPERATIONAL  FGD  SYSTrHS
. ----------------------------------------- PERFORMANCE DATA -------------- ...... ----------- .... .......
PERIOD MO&ULF AVAILABILITY  OPERAHUITY PLIABILITY UTILIZATION  X  REMOVAL    PER   BOILER  FED    CAP.
                                                                 $02   PART.  HOURS  HOURS   HOURS  FACTOR

                           THE  VENTURI/SIKAV TOWfR SYSTEM HAS BEEN  OPERATED  IN A TVO-SER IE S-SCRUEBE R
                           MODE KITH FORtrO OXIDATION SINCE  EARLY  JANUARY  1977 AFTER  SYSTEM  MOfFICA-
                           TJONS TO ALLOV OPERATION OF THE VENTURI  AND  SPRAY TOWER  WITH  INDEPENDENT
                           SLUR RY RECIRCMLATION LOOPS.  SULF1TE  OXIDATION  WAS CARRIED OUT IN AN  8  FT
                           DIAMETER VENTLPI (PRE-S C RUPBER) EFFLUENT HOLD TANK WHICH HAD  AN AIR  SPARG-
                           WITH 130-1/b INtH HOLES IMMERSED  IN  18  FT  OF SLURRY.  THE SRAY  TOWER  (AFTER
                           SCRUBBER) FUNCTIONED AS A PRIMARY S02 ABSORBER.
                           TYPICAL OPERA IION CONDITIONS, USING  LIMESTONE SLURRY, WERE 6.7 FT/SEC SPAY
                          TOWER GAS VELOCITY, 20-30 6AL/MCF  VENTURI L/G, ?Q  GAL/MCF SPRAY TOWER  L/G
                           15 PERCENT SOLIDS   IN  VENTURI  RECIRCULATED SLURRY,  A. 5-5.0
                           VINTIIR1 IKLfT (OXIDATION TANK) PH, AND  11.3  MINUTES OXIDATION  TANK RFSI-
                          DENCE TIME (EA'.tD ON 600 GPM SLURRY FLOW  TO VENTURI).  DURING  THESE TESTS*
                           AVERAGE OVERALL SULF1TE OXIDATION RANGED FROM 93  TO 99  PERCENT AT AIR
                           ST01CHIOMETRI I RATIO OF 1.0 TO 4,7 LB-ATOMS  OXYGEN/LB-M OL E S02 APSORBEO.
                           CORRESPONDING AVERAGE OXIDATION  IN THE  SPRAY TOWER RAN6ED  FROM 1C TO  16  *
                           AVERAGE OVERAIL LIMESTONE UTILIZATION RANGED FROM »3  TO  96 X
                           SCALING WAS EXPERIENCED IN EITHER SCRUBBER.  AVERAGE FILTER CA«E SOL1&S
                           WERE 79 TO 66 S BY WEIGHT COMPARED WITH  55-65 X  WITHOUT  FORCED OXIDATION.
                           SLURRY SOUDS SETTLING RATE RANGED 0.5  TO  1.4 CM/MZN, 5  TO 10  TIMES
                           FASTER THAN T^T FOR UNOXIDIZED  SLURRY.  FINAL SETTLED DENSITY  RANGED  65-8C
                           PIRCF.NT SOLID; COMPARED WITH  45-&C PERCENT FOR  SLURRY WITHOUT  FORCED  OXI-
                           DATION.
                           FLY ASH-FfcEE UMFSTONE TESTING ON THE TcA  SYSTEM  WAS  COMPLETED IN EARLY
                           FEBRUARY. THE PH OF THE FLY ASH-FREE  SLURRY  WAS  0.? TO  0.3 UNITS  Hit  HER
                           TfcAN OBSERVED IN PREVIOUS RUNS WITH  FLY  ASH. IN  ADDITION m  FLY  ASH-FREE
                           SLURRY APKARlD TO HAVE INFERIOR  SOLIDS  DEHATER1NG CHARACTERISTICS.  FOR
                           EXAMPLE THF Ci-MTRIFUGE CAKE SOLIDS AVbRAGEC  ABOUT 50  *  COMPARED WITH
                           AtOUT 60  r-FFCf^T FOR SLUDGE CONTAINING  FLY ASH.
                           1KTEUS1VE FLU:: GAS C HAR ACTC RI ZAT I ON  TESTING  WITH  LIMESTONE SLURRY ON  THE
                           TCA  SYSTEM  BEtAN IN EARLY FEBRUARY AND  ENDED IN  EARLY MARCH 1977. PRFLIM-
                           IMRY ANALYSIS OF THE  DATA SHOWED AN OUTLET MASS  LOADING OF 0.4-0. S
                           GK/DSCF  FLY A £H AND 0.02-0.03 GR/CSCF FOR  FLUE  GAS WITHDRAWN  DOWNSTREAM  OF
                           THE  ESP.11  WAS ESTIMATED  TNAT THCSr  OUTLET MASS  LOADINGS CONTAINED ABOUT
                           0.03 GR/DSCt  fLY ASH, 0.0? GR/DSCf REENTRA1NED SLURRY  SOLIDS AND 0.015
                           ENTRAINED DISSOLVED  $OLID$(wHEN  A CONTINUOUS MIST ELIMINATOR  UNDER WASH
                           WAS  USED, THEU VALUES VA*T DEpENBlMG ON THE MlST ELIMINATOR  WASH SCHEME
                           AKD  GAS  FLOW  MTE.
              AFFECTED MODULES: SYSTEM

  2/77  SYSTEM                                                                 672

  3/77  SYSTEM                                                                 "*

        ** PROtiLEMS/SOLUTIONS/COMMENTS
              START DATE   3/77      till^ENT!  FGD  SYSTEM,  RENE HAL
              END DATE     -?/77      CCM"tNTS:  RESEARCH  AND  DEVELOPKINT
                           DURING  MARCH  1HE VI NTUR I /SPRA Y TOUEH HAS TESTED WITH  L1MF SLURRY  AND FLY
                           ASH  LADEN FLUf GAS  IN  A  TWO-STAGE SCRUBBER MODE WITH  FORCED OXIDATION OP-
                           ERATION  WITH  LIME  WAS  SIMILAR TO THE PREVIOUSLY REPORTED  LIMESTONE  OPERA-
                           TION WITH f,fcFfTER  THAN 95 PERCENT OXIDATION AT  AN AIR S TO ICHI OWE  T RIC RATIO
                           OF  1.5  Lfl-ATOfS  OXYGEN/L^-WOLE S02  ADSORBED WITH A SIMPLE AIR SpARGfP IN
                           VENTURJ  HCLl)  1ANK.  SLURRY SOLIDS SETTLING RATE  VARHD FROM 0.( TO 1.9 CM/
                           I" IN  (A  5  TC  1f-FOLD  ENHANCEMENT  OVER UNOXIfimD SLURRY) AND FILTER  CAKE
                           SOLIDS  RANffD  TROM  74  TO  8?  PERCENT  COMPARED TO 45 TO 60  PERCENT  WITH UN-
                           OXIDmO    Uir.
                           TkO  MAJOR  DIFFERENCES BETWEEN LIME AND LIM|STONE WERE OBSESVED IN A T«0-
                           S1AGE  FORCED  (XIDAT10N SYSTEM TO MAINTAIN PH CONTROL IT WAS NECESSAKT TO
                           FEED  LIME  TO  I'OTH STAGES. WITH LIMESTONE, FEED ONLY TO THf SECOND STAGE WA
                           WAS  ADEfiuATi.  TO MAINTAIN ROX SOJ REMOVAL, IT WAS NECESSARY TO °""ATt
                           WITH  A HIGH SLURRY SOLlOS CONCENTRATION IN THE SPRAY TOWER LOOP WITH LIME-
                           STONE  (15  PERIFNT)THAN WITH LIME (A PERCENT), RESULT^? IN A TIGHTER WATER
                           IALANCE  WITH  LIMESTONE AND INADEQUATE WATER TO FLUSH THE MIST ELIMINATOR.
                           PRELIMINARY LIMESTONE TYPE AND GRIND TESTS MADE ON THE TCA SYSTEM DURING
                           MARCH  INDICATE  THAT 502 RFMOVAL IS IMPROVED 6Y THE' USF OF FINER GROUND
                           LIMESTONE. SO.  REMOVAL WITH I? BUI V AL E NTL Y GROUND FREDONIA WHITE AKD LON6-
                           VUW  ALABAMA  UMSTONES WAS THE SAME. BLUDSTREAN fORCtD OXIDATION TSSTS
                           ARE  BEIN«  CONDUCTED WITH A PENSERTHY ELL-3 INJECTOR IN A CLOSED LOOP
                                                 313

-------
FPA UTILITY F&D SURVEY:  DECfc"fctR  \t>lf  - JANUARY  1979
                                              SECTION  3
                      DESK-M *ND  PERFORMANCE DATA  FOP  OPERATIONAL  FCD SYSTEMS
	ftK FORMANCF  OAT A	'	
PERIOD  MODULE AVAILABILITY OPERAHILITY   FLIArULITY  UTILIZATION   X  REMOVAL    PER  BOILER   FGD   CAP-
                                                                     SO?  PART.  HOURS HOURS   HOURS FACTOR

                            AROUND  A  t-LEfi: STRfA*  HOLD TANK.  INITIAL TESTS WERE  UNS UC ES S Fill  CUE TO
                            HIGH  PH  Of  7  10  8  IN  THF HOLD TANK-  BY  LOWERING  THE HOLD  TANK PH TO 5 OR
                            6,  SULFITE  OXIDATION UP  TO 98 PERCENT  WAS ACHIFVFD.
               AFFECTEU  MODULES:  SYSTEM
  4/77  SYSTEM
                                                                                   7EO
        ** PKOdLEfS/SOLUTTONS/COMKENTS
               START  DATE   4/77      t «U I f" ENT:  FGD  SYSTEfl, GENERAL
               END  DATE     5/77      COKMtwTS:  RESEARCH AND DEVELOPMENT
                            UMT  10  BOILEf WAS  SHUT  DOWN FOR  A  SCHEDULED TWO-MONTH MAINTENANCE OUTAGE.
                            BECAUSE  OF TH'. ROILER  OUTAF-E, THF SHAfcNEE SCRUBBERS  DID NOT OPERATE DURING
                            APRIL  AND KAY .
               AFFECTED MODULES:  SYSTEM

  5/77  SYSTEH                                                                     T><>

  6/77  SYSTEM                            '                                        720

        ** PR06LEKS/SOLUTIONS/CCMENTS
               START  DATE   6/77      £OUI!ltENT:  F60  SYSTEM, GENERAL
               END  DATE     7/77      COKMFNTSS  RESEARCH AND DEVELOPMENT
                            SCRUfcBFR OPfcR,«TlON  RESUMED ON JUNE  15 AFTER A 10-WEEK SCHEDULED  MAINTEN-
                            AkCE  OUTAGE Of\ THE  BOILE.F).
                            TfcE  VENTUR/SP i-/Y  TOWER SYSTEM CONTINUED  TO OPERATED  WITH  TW 0  SCRUEiBEP
                            STAGFS AND FOICEO  OXIDATION BY NFANS  OF  AN AIR  SPARGING PING  IN  THE VEN-
                            TIIRI  HOLD TANK,  IN  JUNE  AND JULY, OPERATION WAS  WITH LIME  SLURRY AND fLY
                            ASH-FREE fltE 
-------
                                              EPA UTILITY FED SURVEYS  DECEMBER  1978  -  JANUARY  1«79
                                            SECTION 3
                    DESIGN  AND  PERFCRMAKE DATA FOR OPERATIONAL  FGD  SYSTEMS
........	....	..	-•-•-PERFORMANCF DATA-—-	..... —......	.....	
PERIOD MODULE AVAILABILITY  OPERABILITY PLIABILITY UTUIZATION  *  REMOVAL    PER   BOILER   FGD   CAP.
                                                                 802   PART.  HOURS  HOURS  HOURS  FACTOR
»•»"•• * !•• »• ww »™«B^w»-»«B»»»t«fr«m  »ww»w»ww™i»™w in««*iB,MiHM,a-i>»>«>*e «.BBw»«m»B«M,M«(Mihe«  >• w* >* m «v  « *aw >v m  matwnm  «» w «a •» „ —  • •••••  ««•••«
                          97  PERCENT SULFITE OXlDA^ON  AT  «N AIR STOJCMIOMITRY  OF 1.7  ATOMS  OXTSEN/
                          HOLE SOZ ABSOI'&ID AN6 AN OXIDATION PH OF 5.5. THI F1LT|R  CAKE  SOLIDS CON-
                          TENT AVIRACit-D PETTIS THAN PI  PERCENT. TISTS WERE  ALSO CONDUCTED WITHOUT
                          TH DfSUPlRSA HIRATICN TANK  IN THi VENTURl SLURRY  LOOP AND  WITH THE OXIDA-
                          TION TANK LEVU DROPPED FROM  1R  TC U FT WITHOUT  ADVERSE  EFFECTS.
                          BURJN6 AUGUST AND SEPTEMBER THi  TCA SYSTEM  WAS OPERATED MOSTLY IN  A  TWO-
                          TANK FORCE OXIDATION ROD I USJN6  AN Alfl ED4ICTOR.  TH!  TEA EFFLUENT (LI*I-
                          STONF SLURRY HTH A HIOH FLU  ASH LOADING) WAS COLLECTED IN A SMALL LOW-PH
                          ALURRY HOLD TANK WHiRI LIKISTQNi WAS  ADBID  THUS  TAKING  ADVANTA6E OF  THE
                          LOW PH SLURRY THROUGH THE AIR IBUCTOR FOR IMPROVED SULFJT6 OXIDATION AND
                          HlgH PH SLUftRI TO TCA FOR PETTER 50?  REMOVAL.
                          TrsT WERE MADi BOTH WITH THE  AIR EOUCTOR MOUNTED  ON  TOP OF THE EFFLUFNT
                          HCtD TANK WIT) BOWNWARD SLURRY  DISCHARGE TO THF  BOTTOM  OF  THE  TANK.  AVER-
                           AGE SULFIlt OHDAT10N RANGE FROM 9! TO 98 X AT ABOUT  2.5  AIR STOICHIOMETRY
                           AAD 5.2 EDUCTCR INLET PH. DURING 1WO  OF  THE RUNS  MADE IN  AUGUST WHEN
                           ThE ROTARY DRl» FILTER WAS  USED  THE  FILTER  CAKE  SOLIDS  CONTENT AVERAGED
                           f. 5 AMD 8P PERCf NT.
                           A ttN-DAy RUN VAS WADE IN SEPTtMPER ON THE  TCA SYSTEM WITH AUTOMATIC LIME-
                           STONE FEED CONTROL BASED ON STO1CH10METRY.  THE LIMFSTONE  SLURRY FEED RATE
                           WAS CONTROLLFl BY THE FLUE  GAS  FLOW  RATE AND  THE  INLET  502 CONCENTRATION.
                           TfcE CONTROL S«TEM WORKED WELL  ACCOROIN6 TO THF  SPECIFICATIONS.
              AFFECTED MODULES: SYSTEM

  9/77   SYSTEM                                                                 720

 10/77   SYSTEM                                                                 74*

        **  PROBLtMS/SOLUTlONS/COKMENTS
              START  DATE   10/77      fcOUI fMENT:  FED SYSTEHt  GENERAL
              tND DATE    11/77      COMWFN1S: RESEARCH AND  DEVELOPMENT
                           TI-E VENTURI/SFKAV TOWER SYSTEM  CONTINUED TO OPFRATE  WITH  TWO SCRUBBER
                           STAGFS AND  FORCED OXIDATION IN  THE VENTURl  HOLD  TANK.  IN  OCTOBER,  THE FOL-
                           LOWING IHPROVtKENTS  WERE MADE WITH NO SIGNIFICANT DROP  IN  OXIDATION  EF-
                           FlCIfNCY  HTH  SATISFACTORY  S02  REMOVAL  EFFICIENCY.
                           THE SPRAY TOWER GAS  VELOCITY  WAS INCREASED  FROM  6.7 TO  9.4 FT/SEC.
                           ThE PXjDATlON  TANK LEVEL WAS  DRIPPED  FROM  1,  TO  U FT.
                           THE AIR  SFARGIO RING  CONTAINING  AC  lU-jNCH DIA«f.TER HOLES*  W*S RE~
                               FLACEO  HIM A SINGLE S-INCH  DIAMETER PIPE SIDCHARCING  DOWNWARB AT THE
                               CENTEF.  OF  THE OXIDATION TANK I  INCHES  FROM  THE BOTTOM.
                           WITH AIR  UISOARGID  FROM AN OPEN-ENDED  PlP£  IT   WAS APPARENT THAT THE AIR
                           DISPERSION  IN  THE OXIDATION TANK WAS  ACCOMPLISHED MAINLY  6Y  THE TURhlNE
                           AtMATOR  MTHTK THAN  THE STARGER. IN  NOVEMBER,  A ONE-MONTH RELIABILITY
                           TEST WAS  STAR1ED  ON  THE VENTURl /SPR AY TOWER  SYSTEM USING  FORCED OXIDATION
                           WITH TWO  SCRUU ER STAGES AN!)  LIMESTONE  SLURRY WITH HIGH FLY  ASH LOADING.
                           THE  FLUE  CAS  KATE TO  THE SCRUBBER SYSTEM WAS  VARIED ACCORDING  TO THE BOIL-
                           ER  LOAD  WHICH  f'ANGED  BETWEFN  100 AND  155 MW.  TEST CONDITIONS WERE  SELECTED
                           TC  MFET  TfcE  E FA NEW  SOURCE  PERFORMANCE  STANDARDS OF 1.2 IBS  502 AND  0-1
                           Lt  PARTiCLiUT-  PER MILLION  BTU.  THIS  RUN «AS  STILL IN PROGRESS AT THF END
                           Of  NOVEMBER.  (M THE  TCA  SYSTEM,  FORCED  OXIDATION WlTH A SINGLE SCRUBBER
                           STAGE USIH.P  **  AIR EDUCTOR  WAS  SIDCONTINUED IN  EARLY OCTOBER AFTER A HOLE
                           ERODED THPOU6H  THE OF.UCTOR  BODY COFiCED  OXIDATION TESTING  WILL BE RESUMED
                           Id  EARLY  tECEnER AFTER  AN  AIR  SPARGER   IS  INSTALLED.
                           Ik  OCT0eeF:-NO«MEER,  A  ONE-MONTH RELIABILITY  TEST WITHOUT  FORCED OXIDATION
                           WAS CONDUCTED  ON  THE  TCA SYSTEM  WITH  LIMESTONE  SLURRY,  FLUE  6AS WITH HIGH
                           FLY ASH  LCADItC,  THREE  HOLD TANKS IN  SERIES,  AND 7.5 INCHES STATIC HEIGHT
                           Of  NlTRILE  F0«  SPHERES  IN  EACH Of  3 BEOS IN  THE TCA GAS  RATE TO THE
                           SCRUPEIER  VAS  \ARIEp  WITH BOlLER LOAD  AND STOHHIOME TR 1C RATIO WAS CON-
                           TROLLED  BY  AM  AUTOMATIC  LIMESTONE FEED SYSTEM.  CONDITIONS  WERE SELECTED TO
                           MEET THE  EPA  I^FW  SOURCE  PERFORMANCE   STANDARDS AT A LOW ST 01CH10MTRIC RATIO
                           OF  1.2 MOLES  IA/MOLE  502  ABSORBED.  THE  AVERAGE  502 REMOVAL  FOR THE ENTIRE
                           ftlN WAS  8t  PERCENT  *T 2600  PP« WHICH WAS 6FTTER   THAN THE  83 PERCENT RE~
                           OU1PFD  TO  F»fET  THE  EMISSIONS  STANDARD.  HOWfVER,   THF STANDARD  WAS  FRE6UENT-
                           LY  EXCftDtD  FIR  PERIODS  GREATER THAN THE 3 HOURS ALLOWED  BY THE EPA REGU-
                           LATIONS.  AVERAGE  OUTLET  PAPTICULATE   MASS LOADING WAS 0.043  GRAIN/SCF DRY
                           k'HlCH WAS  BETltR  THAN THE  0.052 GRAIN/SCF DRY (30 PERCENT EXCESSAIR) RF-
                           GL'IRED  TO  ?EEl THt  STANDARD.  THE RANGE  OF THE OUTLET MASS LOADING WAS
                           P.02C TO  G.G6'-  GRAIN/SCF  DRY.
                                                 515

-------
?PA UTILITY  Ft,D  SURVEY:  OECfKBfR 197F - JANUARY  1979
                                             SECTION  3
                     DESIGN AND PERFORMANCE  DATA  FOR OPERATIONAL F6o SYSTEMS
				PERFORHANCF  DATA	«...
PERIOD  MODULF  AV«IIAPILITV OPEPABUHY  PLIABILITY  UTILIZATION  * REMOVAL    PER   BOILER  FGD   CAP.
                                                                  S02  PART.  HOURS  HOURS  HOURS FACTOR

              AFFECTED  MODULES: SYSTEM

11/77   SYSTE*                                                                   720

12/77   SYSTEf                                                                   7«4

        ««  PRO&LEMS/SOLUTI ON 5/COMK:EN1 f
              START DATE  1?/77     fceim»EMT:  FGD  SYSTEM* E EN E R AL
              END DATE      1/78     COKMFNTS:  RESEARCH  AND DEVELOPMENT
                           A LIMESTONE RELIABILITY  TEST ON THE VENTURI/SPRAY  TOWER  SYSTEM WAS
                           COMPLETED  IN  MD-DECE«BER,1977 AFTER 965 OPERATING HOURS. THE TEST WAS
                           CONDUCTED  HTH  TWO  SCRUBPER  LOOPS WITH FORCED OXIDATION  IN THE MRSTCVEN-
                           TLRI) LOOFi TI-E fLUE  GAS  FLOW RATE WAS VARIED ACCORDING  TO THE BOILER LOOT)
                           WHICH RANGED  ifTwEEN  100  AND 155 KU .
                           TfST CONOITlOrv? WERE  SELECTED TO KF.ET THE FPA NEW  SOURCE PERFORMANCE STAN-
                           DARDS OF 1.2  in 502  AND  0.1  LB PA«TICULATE PER MILLION  BTU. THE OPERATING
                           RELIABILITY Of  THE  SYSTEM WAS DEMONSTKATEC. HOWEVER,  DUE TO WIDE VARIATION
                           Ik THE INLET  sn?  CONCENTRATION  AMD THE  SLOW SYSTF.H RE-
                           SpONSE TIME THE SO?  EMISSION STANDARD WAS FREQUENTLY  EXCEEDED FOR PERIODS
                           GREATER THAN  1H£  THREE  HOURS ALLOWED BY EPA REGULATIONS. AVERAGE S02 RE-
                           MOVAL FOR  THE ENTIRE  RUN  WAS 86 I AT 2950 PPM AVERAGE  INLET S02 WHICH WAS
                           H16HFR THAN T(£ 84  *  REfllJIRED TO MEET THE STANDARD FOR  2800 PPM INLET
                           5C2. THE OUTLET PARTKULATE  LOADING RANGED FROM  0.021  TO 0.063 6RAIN/DRY
                           SCF, WITH  A RIM AVERAGE  OF  0.012 GRAIN/DRY SCF.  THESE  VALUES COMPARE WITH
                           LCADING OF L'.l'SZ  GR/DRY  SCF  Oft LESS REOUIRED TO  MEET  THE EPA PARTICIPATE
                           STANDARD ASSUHNG 30  PERCENT TOTAL BOILER EXCESS  AIR.

                           ANOTHER RELIABILITY  RUN  ON  THE VENTUR1/SPRA* TOWER SYSTEM WAS STARTED IN
                           HID  DECEMBER  (SING  LIME  SCRUBBING. THE RUN WAS COMPLETED IN JANUARY 1978.
                           HUH THE EXCflTION  OF HIGHER SPRAY TWOER INLET PH  AND  HIGHER ALKALI UTILI-
                           ZATION INHEREhT WITH  THE  LIME SYSTEM, THE OPERATING CONDITIONS AND THE
                           TkST RESULTS  vrRE SIMILAR TO THOSE OF THE LIMESTONE RELIABILITY RUN.

                           oh THF TCA SY;TE«»  TWO  RUNS  WERE MADE  yiTH THE  NITRILE  FOAM SPHERES RE-
                           PLACFD BY  A tr  INCH  HEIGHT  (23 LAYERS) OF CElLCOTE PACKING SUPPORT PIATES.
                           AT fULL GAS FLOW  RATE OF  30,000 ACFM, THE 502 REMOVAL  FOR THE CElLCOTE
                           PLATES WAS SLK.HTLY  LESS  THAN THAT OF A 3-FJED, 4-GRID  TCA WITH FIVE INCHFS
                           OF STATIC  SpHtrE  HEIGHT PEP  BED. HOWEVER, AT 1C,000 ACFM THE 502 REMOVAL
                           FOR  THE CEILCfTE  PLATES  WAS  A FEW PERCENTAGE POINTS HIGHER THAN THAT EX-
                           PERIENCED  WITH  THE  TCA  BEDS.

                           FORCED OXIDATION  TESTS  WERF  CONDUCTED ON THE TCA  SYSTEM  WITH AN AlR SP»«6-
                           ER USING LIME1TONE  SLURRY WITH HIGH FLY ASH LOADING.  BOTH ONE-TANK tAIR
                           SPARGING AND  LIMESTONE  ADDITION IN THE SAMF.TANK)  AND  TWO-TANK (AIR SPAR6-
                           JkG  IN THE FIfcST  TANK AND LIMESTONE ADDITION IN  THE SECOND) CONFIGURATIONS
                           WERE USED. NE«  COMPLETE  SULF1TE OXIDATION WAS ACHIEVED  IN BOTH CONFIGURA-
                           TIONS AT AN AIR  STOICHIOMETRY OF 1.8 ATOMS OXYGEN/HOLE SOZ ABSORPED AND
                           OXIDATION  PH  ff  5.4-S.7.  THE OXIDATION TANK LEVEL  WAS  18 FT.
              AFFECTED  MODULES: SYSTEM

  1/7P   SYSTEM                                                                  744

  2/7?   SYSTEM                                                                  672

        ** PROBLEMS/SOLUTIQNS/COMMENTS
              STAPT DATE   2/7?     E6UIFKENT:  FGD SYSTEM, GENERAL
              END DATE     3/78     CPMMtNTS:  RESEARCH AND DEVELOPMENT
                           MAJOR SYSTEM  iOWNTIMES  DURING THE PERIOD INCLUDEDD JANUARY 26 THROUGH  FEB-
                           RUARY < FCP TtE  VENTURI/SPRAY TOWER AND JANUARY  36 THROUGH FEBRUARY 2  FOR
                           ThE  TCA SYSTEM  DUE  TO FREEZING WEATHER. ANO MARCH 6 THROUGH MARCH  17  FOR
                           DCTH SYSTEMS  CUE  TO  BOILER OUTAGE.
                           TKE  EFFECT OF THE SLURRY LEVEL IN THE AIR SPARGED OXIDATjON TANK  WAS  IN-
                           VESTIGATED IK THE TWO SCRUBBER LOOP VENTURI/SPRAY TOWER SYSTEM WHICH  IS
                           OPERATING  OK  UME SLURRY WITH HIGH FLY ASH  LOADING. NEAR COMPUTE  SUIMTE
                           OXIDATION  (98 t)  WAS  ACHIEVED WITH 14  FT ANB  18  FT OXIDATION  TANK
                           LEVELS AT  AN  HR  STOICHIOMFTRIC RATIO OF I.B  ATOMS OXYGEN/MOLE soz AB-
                           SORBFD. AK Alf  STOICHIOHfTR1C RATIO UP TO ABOUT  3.R WAS NEEDED TO  YIELD
                                                 316

-------
                                               EPA UTILITY fGO SURVEY:  DECEMBER  1V78 - JANUARY 1979
                                             SECTION  3
                     DESIGN AND  PFRFORKAfcCE DATA FOR OPERATIONAL FGD SYSTEMS
......	.	--PERFORMANCE  DATA	.	
PERIOD MODULE  AVAILABILITY  OPF.RAPILITY FHL1ABILITY  UTILIZATION  X REMOVAL    PER   BOILER  FGD   CAP.
                                                                   S02   PART.  HOURS HOURS  HOURS FACTOR

                           NEAR  COMPLETE OXIDATION  WHEN THE TANK LEVEL WAS  DROPPED TO 10 FEFT.
                           A  NEV TEST bL'-CK WAS  STARTED CM PARCH 1 ON  THE VENTURI/SPRAY TOWER SYSTEM.
                           MAGNFSIUM OX IDF WAS  ADDED TO THE SPRAY TOWER  SLURRY  LOOP IN A TWO SCRUBBER
                           LOOP  OPERATION WITH  FORCED OXIDATION IN THF VENTUR1  LOOP. THE SYSTEM WAS
                           OPERATED U A LIMESTONE  SLURRY MOGF WITH HIGH FLY ASH  LOASING. THE PRIMARY
                           OBJECTIVE Cf F16NESIUM  ADDITION IS TO IMPROVE THE 5(J2  REMOVAL EFFICIENCY.
                           BECAUSE Of THL SHORTAGE  OF COAL CAUSED BY THE LOAK MINERS' STRIKE, COALS
                           FROM  DIFFtRLNl SOURCES  VfRf  PURNF.D IN THE BOILFR. AS A RESULT, INLET 502
                           CONCENTRATION FLUCTUATED  AS  MUCH AS TENFOLD (3r-0-3500  PPM) CAUSING PRO-
                           BLEMS IN SYSTfctf CONTROL.
                           TCA  WAS OPERAltD WITH BOTH LIME A M> LIMESTONE fsND WITH MEGNESjUtf OXIDE AD-
                           DITION. FLUE l,AS WITH HIGH FLY ASH LOADING  WAS USED. THESE TESTS WERE CON-
                           OUCTtB PR1PARJLY TO  RESOLVE  SOME OF THE INCONSISTENT RESULTS OBTAINED
                           DURING EARLIEf L 1ME/MGO AND LIMESTONE/MGO  TEST  MADE IN APRIL NOVEMBER
                           1*76. AIR LEAKAGE  THROUGH THE SCRUBBER DOWNCOMER  WAS SUSPECTED IN SOME
                           OF THOSE tALICR RUNS, RESULT ING IN HIGHER-THAN-NORMAL SULFITE OXIDATION
                           AKD  GYPSUM SATURATION.  TEST  RESULTS SO FAR  WERE  1NCONSLUSIVE BECAUSE OF
                           THE  FLUTUATIOC IN  INLET  502  AND CONTROL PROBLEMS  MENTIONED ABOVE.
              AFFECTED MODULES:  SYSTEM

  3/78   SYSTEM                                                                   744

  4/78   SYSTEK                                                                   720

        ** PROfltEMS/SQLUjlONS/COMMENTS
              START  DATE   4/78     tGUjfPENT:  FGD  SYsTEH, GENERAL
              END DATF     5/78     COMMtNTS: RESEARCH  AND DEVELOPMENT
                           TfE  VENTUR1/SFRAV  TOWER  SYSTEM CONTINUED TO OPFRATE  THROUGH EARLY MAY WITH
                           MtO  AUDIT ION AND  WITH  TWO SCRUBBER LOOPS.  THE SYSTEM  WAS OPERATED WITH
                           LIMSTONi SLURRY AND  WITH HIGH FLY  ASH LOADING. rMGO WAS ADDED TO THE SPRAY
                           TbOER SLURRY 100P  TO MAINTAIN AN EFFECTIVE  MGTT  ION  CONCENTRATION OF SOOC
                           PFM   (ABOUT tiOCO PPM  IN  THE VENTUR1 SLURRY LOOP)  TO IMPROVE THE 5C2 REMOVAL
                           EFFIVIENCY IN THE  SPRAY  TOVER. OXIDATION WAS  FORCED  IN THE VENTURI SLURRY
                            HOLD TANK. UKUFR TYPICAL OPERATING CONDITONS, THE OVERALL 502 REMOVAL WAS
                            9t PrRCENT AT 2300 PPM  INLFT 502 CONCETRATI ON,  COMPARED TO 86 PERCENT
                            PL.''0Vt.L  AT 16:.0 PPW  INLET 50? WITHOUT M60 ADDITION.  502 REMOVAL BY VENTURI
                            ALt;NE. WAS  3D  (KRCENT ABOUT THE SAME AS THE  CASF  WITHOUT MGO ADDITION. 50?
                            RtKOVAL PY VEI.TUR1 ALONE WAS 30 PERCENT, ABOUT  THE SAME AS THE CASE WITH-
                            OUT   fGO  AUDITION.  NEAR  COMPLETE SULFITE  OXIDATION COULD BE ACHIEVED AT AN
                            AIR   STOICH10M[TRIO RATIO AS LOW AS 1.3 ATOnS  OXYGEN/MOLE OF SO? ABSORBED,
                            Ifc THE  SAKE  0«ER  AS THE CASE WITHOUT M60 ADDITION.
                            FORCED  OXDATIIN WAS  ALSO CONDUCTED ON THE LIMESTONE  SLURRY BLEED STREAM
                            FROM THE VENTIRI/SPRAY  TOWER SYSTtM. A SINGLE EFFLUENT HOLD TANK WAS USED
                            FOR   EiOTH  VEKTlivI AND SPRAr TOWER.  MGO WAS ADDED  TO THE EFFLUENT HOLD TANK
                            TC MAINTAIN  AC  EFFECTIVE MC-.TT ION  CONCENTRATION  OF 5000 PPM. A SLURRY
                            STREAM  WAS TAM-N FROM THE SCRUBBER DUONCOMER  AKD  SFTT  TO AW OXIDATION TANK
                            UTO WHICH AIP WAS SPARGED.  A RECYCLE STREAM  OF  ABOUT  50 £PM WAS SENT BACK
                            FKCM THE OXIDATION TANK  TO THE EFFLUENT  HOLD  TANK TO CONTROL PH IN THE
                            OXIDATION  TANr  AND TO PROVIDE GYPSUM SEEDS  IN THE SCRUBBER SLURRY FINAL
                            SYSTEM  BLtFfc  MS WITHDRAWN FROM THE OXIDATION TANK.  AT AVERAGE OXIDATION
                            TANK PH  OF 6,  EULFITE OXIDATION AVERAGED 98 PERCENT. FILTER CAKE SOLIDS
                            CONTENT  WAs  Ei  PERCENT,  SIMILAR TO THAT  OBTAINFD WITH TWO SCRUBBFR 1POP
                            OPERATIONS*.  HfVEVEK, THE SLURRY SOLIDS SETTLING  RATE WAS ONLY ABOUT T.4
                            Cf/MIN,  COMPAftO TO  ABOUT 0.8 CM/MIN FOR THE  TWO LOOP OPERATION. SETTLING
                            RATE FOR UNOXIOIZED  SLURRY CONTAINING MAGNESIUM   ION NORMALLY DID NOT EX-
                            CEED 0.1  CM/BIN WITH 50 TO 60 PERCFNT  FILTER  CAKE SOLIDS.
                            TCA   CONTINUED TO OPERATE WITH MGO  ADDITION  W  1TH BOTH LIME AND LIMSTCNt
                            SCRUBBING.FLUt  GAS WITH HIGH FLY ASH LOADING  WAS USED. THE INTENT OF THESE
                            TESTS WAS  TO  CLARIFY SOMF OF THE INCONSISTANT RESULTS OBTAINED DURING
                            EARLIER  RUNS  fADE  IN APRIL-NOVEBPIR 1976t DURING WHICH SCRUBBER DOWNCOMER
                            AIR  LEAKACF  *?••* SUSPECTED IN SOWS  OF THE TFSTS.   IK GENERAL, TEST RUNS  «ADE
                            Ih 1976  HAD  HIGHER S02  CONCENTRATION,  MOSTLY  GREATER THAN  TOOO PFM,  WHILE
                            THE   RECENT  RUI*!; HAD  ONLY APOUT  25CO PPM.  AT THE   HIGHER INLET  So2 AND  THE
                            H1GHEP  RESULTS!  SO 2 MAKE-PER-P AS S, THE  1976  TESTS OPERATED EITHFR  UNSATU-
                            RATAFD  OR  SUPtK  SATURATED WITH  RESPECT TO GYPSUM, DEPENDING ON THE  SULFITE
                            OXIDATION  LEVtL. SEVERE GYPSUM  SCALING OCCURRED   WHEN THE  OPERATION  HAS
                                  GYPSUM-SATURATED  MODE. IN THE RECENT  RUNS, OPERATION WAS MOSTLY
                                                  117

-------
EPA UTILITY F6D SURVEY:  BECEH'FR 1"57? - JANUARY 1979
                                            SECTION 3
                     DESI6N  AND PERFORMANCE DATA FOR OPERATIONAL  FCD SYSTFMS
PfcMOD MODULE AVAILABILITY  OPERAF-HITY
                                           PlftFORMANCf
                                        PLIABILITY UTILISATION
                                                                  X  REMOVAL   P£"  BOILER   FGD   CAP.
                                                                  SO?  PART. HOURS HOURS   HOURS  FACTOR
                                 GYPSUn-JMURAiED MODf.  HOWEVifi t  BECAUSE OF THE LOWfR  INL6T  SO?  AND
                           L6WER S02 MKI-PH-PaSSf THE  S1PSU«  SATURATION LfVSLS V**t  NOT  HIGH  ENOUGH
                           TO CAUSE ANY  'I6N1FICANT
              AFFFCTfB  MODULUS SYSTfcf
 S/7R

 6/7F   SYSTF*
                                                                               720
  7/78   SYSTEM

  8/78   SYSTEM
              STA      ERUjCENTs  FGD  SYSTEM*
              END DATt      7/7F.     COMMiNTS: RESEARCH  AND  DEVELOPMENT
                           KSCPt) OXIDATION FEES STREAM FROM  THE  V ENTUR?/SPRAY TOWI*  SYSTEM  CONTINUED
                           THOUGH HID- JIM. TWO TEST RUNS  TWO  TEST RUNS WERE HADE IN  WH  ICH  MOO WAS
                           AtiOEl' 70 MIN1AIN AN EFFECTIVE  M6*+  CONCENTRATION OF 5000  PPM  IN  THE
                           SCfcUEBER Sl,UR|,Y ANO  NO  RECyCLE  STREAM  WAS SENT BACK FROM  THt OXIDATION
                           TANK  (» FT DIUfTER A^f  T p  FT TANK  LfV6L> TO  THF EFFLUENT  HOLB  TANK.  AV-
                           tBASF SULflTE OXIDATION  WAS  96  X OR  HIGHER AT AN AIR ST01 CH10HE7R jC  RATlo
                           OF 1.6 ATOfS  CXYGEN/MOLE  S02 ABSORBED.  THE  OXIDATION TANK  PH  WAS  5.« TO
                           5.6 CNLy C.2  IMIT HIGHER  THAN THE  FFFLUENT HOLB TANK PH.  THE FILTER  CAKE
                           ECU PS WAS t 5 PERCENT AND  THE SOLIDS SETTLING RATE WAS Q.4  TO  0.5  CM/MIN.
                           PCTH  SCRUI.E'EP SYSTEMS WERE SHUT  H OWN FOR TWO WEEKS FRO* JUNE 19  RUE  TO A
                           BOILFR OUTAGE SCHEDULED  FOR  R£-ROLITlNG THE FLUF 6AS DuCT  FROM  THF  
-------
                                              FPA UTILITY  F6D SURVEY: DECEMBER 1978 - JANUARY 1079
                                            SECTION  3
                    DESIGN  AND PERFOPKAKE DATA FOR OPERATIONAL FGD SYSTEMS
..	-PERFORMANCE  DATA-—	
PERIOD NODUU. AVAILABILITY OPERABU1TY  PLIABILITY  UTILIZATION  * REMOVAL   PER  BOILER  FED    CAP.
                                                                  S02  PART. HOURS HOURS  HOURS  FACTOR

                           TC BE FULLY E fFEclIVE-
                           DETERIORATION  OR  DECOMPOSITION OF AOIPIC Ad" APPARENTLY  TAKES PLACE  IN
                           THE SCRUBBER.  ACTUAL  FEED RATES OF AD1PIC ACID WERE 2 TO  3  TIMES  HIGHER
                           THAN COULD BE  ACCOUNTED  FOR  IN THE SYSTEM DISCHARGE SLUDGE.
              AFFECTED  MODULES: SYSTEM

  9/78  SYSTEM                                                                  720

 10/78  SYSTEM                                                                  744

       **  PROflLEMS/SOLUTIONS/COMMENTS
              START DATE  10/78     EOUIIMENT:  FGD  SYSTEM, GENERAL
              END DATE     11/78     COMMENTS:  RESEARCH  AND DEVELOPMENT
                           A  ONE MONTH LCNG-TERM RELIABILITY RUN WAS CONDUCTED ON BOTH THE VENTURI/
                           SFRAY TOWER AKD  TCA  SYSTEMS  USING LIMSTONE SLURRY WIT H AOIPIC ACID  AS AN
                           ADDITIVE FOR  ifiHANCING  502 REMOVAL EFFICIENCY. STEADY-STATE 50? REMOVAL  IN
                           BOTH RUNS  WAS  CONS1STANTLY HIGH IN THE  RANGE OF  96 TO ">9  PERCENT  UNDER
                           TYPICAL OPERATING CONDITIONS. THE VENTURI/SPRAY  TOWER SYSTEM WAS  OPERATED
                           WITH TUO-SCRUH4ER-LOOP  FORCED OXIDATION. ADIPIC  AC ID CONCENTRATIONS  WERF
                           1500 PPM IN  TK  TCA  AND  THE  SPRAY TOWER, AND 2AQO PPM IN  THE VENTIRJ, BOTH
                           SCRUBBER SYSTEMS OPERATED FREE OF SCALING AND PLUGGING
                           LCNG-TERM  TtSlS  BEGAN IN MID-NOVEMBER TO COMPARE CONVENTIONAL LIME  SCRUB-
                           BING WITH  ADVANCED  L.IMSTONE  SCRUBBING USING CHEMICAL ADDITIVES AND  FORCED
                           OXIDATION. EACH  TEST  WILL LAST ONE MONTH OR LONGER. THE VENTURI/SPRAY TOW-
                           ER SYSTEM  is  rtm  OPERATED  WITH  IWO-SCRUSPER-LOOP FORCED  OXIDATION  AND
                           LIMESTONE  SLUF.RV AND  AOIPIC  ACID  ADDITION. THE TCA SYSTEM  IS BEIN6  OPERAT-
                           ED WITH LIME  SLURRY  (NO  ADDITIVES) AND  WITHOUT FORCED OXIDATION.  DURING
                           THESE  TESTS  CONTINUOUS S02 EMISSIONS  MONITORING  PROCEDURES WILL BE
                           ASSESSED.
              AFFECTED MODULES: SYSTEM

 11/78  SYSTE*                                                                 720

 12/78  SYSTEM                                                                 7*A

        *« PR08LEMS/SOLUTIONS/COfWENTS
              START  DATE   12/78-      EQU1FMENT: FGD SYSTEM,  GENERAL
              END  DATt     1/79      COM!* ::NT S: RESEARCH AND  DEVELOPMENT
                           LCNG-TERM  TESTS ON BOTH  SCRUBBER  SYSTEMS. WHICH  BEGAN IN  MID-NOVEMBER 1976
                           WERE  COMPLETE!, NEAR THE  END OF JANUARY  1979-   THESE  TESTS WERE  CONDUCTED
                           TC COMPARE CONVENTIONAL LIME  SCRUBRING  WITH  ADVANCED  LIMESTONE  SCRUBBING
                           USING  CHEMICA1 ADDITIVES AND  FORCED  OXIDATION.   THE  VENTURI/SPR AY TOWER
                           WAS OPERATED   UTH TWO-SCRUPBER-LOOP  FORCED OXIDATION  AND  WITH LIMESTONE
                           SLURRY AND ADJPIC ACID ADDITION.   THE TCA SYSTEM WAS  OPERATED WITH LIME
                           SLURRY (NO ADi'TIVE) AND WITHOUT  FORCED OxlOATION.   DURING THESE  TESTS
                           CONTINUOUS S0<: EMISSIONS MONITORING  PROCEDURES WERE  ASSESSED.
              AFFECTED  MODULES:  SYS*
  1/79  SYSTEM
                                                                                744
                                                  319

-------
FP» UTILITY FliD SURVM:  BECtfPfR 1'7t - JANUARY 1979
                                            St CTION 3
                     ItSlGN  AND PFRFCRMAf
  ** FUEL DATA
      FUEL  TYPE
      FUEL  CF'ADE
      AVERAGE HEAT TONTEMT - KJ/KG
      RANGE HEAT CONTENT - B TU/lfc
      AVERAGE ASH CONTENT -  i
      RANGE ASH CONTENT - X
      AVtRAGE HOISTLIRF COMTEK! - %
      RANGE MOISTURE CONTENT - *
      AVERAGE SULFUR CONTENT - *
      RANGE SULFUR CONTFNT - £
      AVERAGE CHLORIDE CONTENT - 1!
      RANGE CHLORIDE CONTENT - %
      FUEL  FIRING RAT? - M T /H
      FUEL  F IUNG RATE - Mil
     COAL
     * *****
        25.00
     ******
        10.00
     * *****
         4.30
     ******
     ***** ***
     ******
     *******
     *****
                    ( 10000 BTU/LB)
                     ******
                     (*** TPH)
  • * ESP
      SUPFLJ if
      PARTICULATE DESIGN REMOVAL  EFFIClE»>eY
- X
     KOPPERS
        50.0
  •• PARTICULA7F
      NUIUPEP
      TYPF
      NUMPEP OF STAGES
      SHELL MATERIAL
      BOILER L OAD/Sf RUB8ER  -  t
      L/G RATIO - LmR/CU.M
      PRESSURE DROP - KPA
      PARTICULATE INLET  LOAD  -  G/CU.K
      PART1CUIATE OUTLET LOAD - 6/CU.K
      PARTICULATE DFSIGN REMOVAL  F.FF1CIE&CY
      SOZ INLET CONCENTRATION - PPM
      S02 DESIGN REMOVAL EFFKIFMCY  - X

  ** FGD SYSTEM
      SALEABLE pROtucT/ThRow*w*>  PROIUCT
      GENERAL PROCESS TYPE
      PROCESS TYPE
      SYSTEM SUPPLIER
      DEVELOPMENT LEVFL
      NEh/RETROFIT
      PARTlCtlATE DESIGN REMCVAl  EfFlClEUCY
      SOZ DESIGN REMOVAL EFFICIENCY  - X
      COMMERCIAL DATE
      INITIAL START-UP
      CONSTRUCTION INITIATION
      CONTRACT AWARDED
- X
     VARIABLE THROAT VENTURI
         i
     316L SS
        25.0
         1.3         (10.0  GAL/1000ACF)
         1.2         t    5  JN-H20)
        12.6         (   5.50 GR/SCF)
          .1         <   .020 GR/SCF)
        99.5
      34*0.000
        10.0
     THROWAWAY PRODUCT
     WET SCRUBBING
     LIMESTONE
     TENNESSEE VALLEY  AUTHORITY
     FULL-SCALE
     RETROFIT
        99.5o
        eo.oo
      1/7H
      5/77
      2/73
      2/73
      TYPE
                                                  MULTIGP.ID TOWER
                                                 320

-------
                                            EPA UTILITY  F6D  SURVEY:  DECEMBER  1«?8 - JANUARY 1979
                                          SECTION  3
                   DESIGN  AND PERF0PMAKCE DATA FDR OPERATIONAL  F6D SYSTEMS
   INITIAL  START  UP
   SUPPLIER
   NUMBER OF  STAGES
   DIMENSIONS
   SHELL MATERIAL
   SHELL LINER  MATERIAL
   INTERNAL MATERIAL
   BOILER LOAD/APsORBER - X
   L/6  RATIO  -  L/CU.H
   PRESSURE DROP  - KPA
   SUPFRFICAL 6AS VELOCITY - M/SEC
   PARTICIPATE  OUTLET LOAD- G/CU.K
   S02  OUTLET CONTRAT10N - PPP
   S02  DESIGN REMOVAL E.FF1C1FNCY - !!

** ABSORBER
   NUMBER
   TYPE
    INITIAL  START UP
    SUPPLIER
    NUMBER  OF  STAGES
    DIMENSIONS
    SHELL  MATERIAL
    SHELL  LINER MATERIAL
    INTERNAL MATERIAL
    BOILER  LOAD/APsORBtR  -  X
    L/6 RATIO - L/CU.M
    PRESSURE DROP - KPA
    SUPERF1CAL GAS VELOCITY  -  M/SEC
    PARTICULATE OUTLET LOAD  -  NG/J
    SOZ OUTLtT CONTRAT10N  -  PPC
    502 DESIGN REMOVAL EFFICIENCY  - i

** FANS
    NUMBER
    TYPE

** WIST ELIMINATOR
    NUMBER
    TYPF
    CONSTRUCTION  MATERIAL
    CONFIGURATION
    NUMBER OF PASSES
    DEPTH - M
    VANE SPACING  -  CM
    WASH SYSTEM
    SUPERFICIAL 6AS VELOCITY - «/S

 ** PROCESS  CONTROL  CHEMISTRY
    CONTROL VARIABLES
    SENSOR  LOCATION
 5/77
POtYcON
    5
JO WIDE X U DEEP  X 34 HIGH
CARBON STEEL
RUPBFR, 3UL SS ON SLOPIN6 SECTIONS
314L SS GRIDS  (BOTTOM, CENTER  AND  TOP);
   25.0
    ?.0         t 60.0 GAL/1000ACF)
     .5         ( ?.0 IN-H20>
    3.7         ( 12.0 FT/S)
     .0         (   .020 6P/SCF)
  *5Q
   7C.O
 1
           TOWER  WITH  PACKING
 5/77
POLYCON
     5
20 WIDE  X  1t  DEEP  X  34  HIGH
CARBON  STEEL
RUPBFR,  3VL  SS  ON  SLOPING  SECTIONS
31«L  SS  GRIDS  (BOTTOM,  CENTER  AND  TOP);  FRf>
      .0
     P.O
      .5
     1.7
     9.
   650
    70.0
 BOILfR  I.D.
 CHEVRON
 31*L  SS
 VERTICAL
     4
      .30
     1.P
 CONTINUOUS
     2.7
t 60.0  6AL/TOOOACF)
t 2.0 IN-H20)
< 12.0  FT/S)
<  .020 LB/IWTU)
< 1.0 FT)
< 1.50 IN)
       FT/S)
 PH»  PRESSURE CHANGEi OUTLET
             RECYCLE LINE
 «*  PUMPS
     SERVICE
     ABSOPpEP  RECIRCULAT]ON
     VENTURI  RECIRCULATION  RUMPS
     VENTURI  RECIRCULATION  PUMPS (SPAKE)
     LIMESTONL  SLURRY  FttD  PUMPS
     POND WATER  RETURN  PUMPS

 «*  TANKS
     SERVICE
              RECIRCULATION
     VENTURI  RECIRCULATION TANKS
     LIMESTONE  SLURRY  STORAGE
     RECIRC TNK  UNPRFLW  SUME TANK

 «*  REHEATER
     TYPE
     HEATING  MEDIUM
     TEMPERATURE BOOST - C
 NUMBER

   10
    4
    2
 • ***
 ****
 NUMBfK
 INDIRECT HOT AIR
 ETEAf
    27. e         e
    50  F)
                                                321

-------
FP» UTILITY  FSO SURVEY:  DtClf.f-Efc  1">7f  - JANUAPY  1979
                                              SECTION  3
                      DESIGN AMD  PERFORMANCE DATA  FOR OPERATIONAL  FGD SYSTEMS
  *•  "EA6ENT PKEPAR»TION  io
      NUMPFR Of BALL  MILLS
      BALL MILL CAPACITY- M T/H
    1
   45.?
{ 50.0 TPH)
  **  DISPOSAL
      NATURE
      TYPE
      DIMENSIONS
      AREA - ACRES
      CAPACITY  -  CU.fc
FINAL
POND
110 ACRES  * -'0 FT  DEEP
  111.0
   4035900     <   3300.0 ACRE-FT'
 	PERFORMANCE DATA	
 PERIOD MODULI  AVAILA01LITY  OPERAHILITY  tfLIABILITY UTILISATION   % REMOVAL    PER  BOILER   FGD   CAP.
                                                                     SO?  PART.  HOURS HOURS   HOURS FACTOR
6/77




6A
er
BC
80
SYSTEf Z*.0 70. 0 30.0 26.0




744 657 0
        **  PROeLE«S/SOLUTIONE/COCilNTS:
                             TVA  HAS HAD EXTENSIVE  PROBLEMS WITH  START-UP OF  ITS SCRUBBFR  FACILITY.
               AFFECTED MODULES: SYSTEM

        «•  PR06LEMS/SOLUTIONS/CCMMENTS
               START DATE    8/77     t6UKwENT:  FAN
               END DATE      t/77     PROPLhM; C H EMI C AL-RE LAT E 0  EROSION
                             THERE HAVE BttH  EROSION PROBLEMS  HTH THE l.D.  FAN BLADES.
               AfFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLU1IONS/COMMENTE
               START DATE    8/77     ESUli^ENT:  FAN
               bND DATF      S/77     PPOBlfM: MECHANICAL-RELATED COMPONENT  INEFFICIENT
                             TKE  FAN DRIVE "OTORS  HAVF ALSO BF.EN  TROUBLfSOMt.
               AFFECTED MODULES; SYSTEf

        **  PR06LEMS/SOLUTIONS/COM«1ENTS
               START DATE    t111     tCUIF^ENT:  GAS DAMPER
               END DATE      £ /77     FROB iT ft • ME CHA N I C A L-RE L ATE D COMPONENT  FAILURE
                             THE  EU1LLOTINF  DAMPERS ARE INOPERARLE DUE TO JAMMED GEAR  BOXES.
               AFFECTED MODULES: SYSTfM

        *«  PROULEMS/SOLUTIONS/COMMENTS
               START DATE    fi/77     ECUIh>.ENT:  GAS DAMPER
               E.ND DATE      P/77     PROB15M: CHEMICAL-RELATED  EROSION
                             THE  SEALS AROlfJD THE:  DAMPERS HAVE  CORRODED,  CAUSING LEAKA6F  OF THE FLUE
                             GAS AND PARTI tULATE .
               AFFECTED MODULES: SYSTEM

        **  PROBLEMS/SOLUTIONS/COMMENTS
               START DATE    R/77     ECUIFfENT:  ABSORBER
               END DATE      8/77     PROBLEM: NOT DEFINED/SPECIFIED
                             T»iE  RUBBER LIMNG  IN  THE ARSORBER  SECTION OF All FOUR TRAINS HAS  DETACHED
                             Ik VARIOUS PLACES.  THE VENDOR  HAS  REPAIRED  THE  DEFECTIVE  SECTIONS.
               AFFECTED MODULES: SYSTEM

        ••  PROBLEMS/SOLUTIONS/COMi»ENTS
               START DATE    8/77     EQUIPMENT:  INSTRUMENTATION
               END DATE      ?/77     PROBLEM: NOT DEFINED/SPECIF1ED
                             1KSTRUKENTATICN  HAS  BEEN A SERIOUS PROBLEM  AREA.
               AFFECTED MODULES: SYSTEM

        *•  PRObLEMS/SOLUTIONS/COMMENTS
               START DATE    8/77     t-etl FXENT:  REAGENT  HANDLING
               tND DATE      8/77     F-PCBl?M:  NOT D E F INE D /S PIT CI F I ED
                             THE  EAL.L FILL  IS ONLY ABLE TO  PRODUCE  35  TPH OF LIMESTONE SLURRY  OUT OF
                             IT'S 50 TPH  CAPACITY.
                                                   122

-------
                                              EPA UTILITY  FGD  SURVEY:  DECEMBER 1978 - JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PESFORKAKCE DATA FOR OPERATIONAL FGD SYSTEMS
... ---- ........... ---- ....... ------------ -PERFORMANCE  DATA -------- ...... ------- ........ ____ .. ...... .
PERIOD MODULE AVAILABILITY  OPERA0IL1TY IE LIAEI 1LITY UTILIZATION   X  REMOVAL   PER  BOILER  FGD   CAP.
                                                                  S02  PART. HOURS HOURS  HOURS FACTOR

             AFFECTED MODULES:  SYSTIf

 9/77  6A
       SB
       8C
       60
       SYSTEM       75.0         71.0        71.0         60.0                  7?0   609      0

       *« PRO&LiWS/SOLUTIONS/CCMMENTS
             START  DATE    9/77     EUL'I ffENTs  B01 LPR-Rf LAT| D
             END  DATE      9/77     COMMtNTS:
                           DIR1N6 THIS MCNTH THE  BOILER WAS  OPERATED AT A REDUCED LOAD OF ABOUT
                           TCC PW. AT THJS REDUCED  LOAD, ONLY 3  TRAINS WERE RE8UIRED TO HANDLE
                           ALL CF THE bOJLER FLUE GAS.
             AFFECTED  MODULES: SYSTEM

       *« PK08LEMS/SOLUTIONS/CONMENTS
             START  DATE    9/77     IOU1FMEHT:  FGD  SYSTEM, GENERAL
             END  DATE      9/77     PROBLEM: CHEMICAL-RELATED SCALING
                           SOME SCALING  k»S  DISCOVERED  IN THE ABSORBER COLUMN AND ENTRAINMENT
                           SEPARATOR OUTLET  OF  ONE;  TRAIN.
             AFFECTED  MODULES: SYSTtC

       ** PRObLEMS/SOLUTIONS/COKMENTS
             START  DATE    9/77     tOUIlKENT:  FAN
              END  DATE      9/77     PROBLEM: CHEMICAL-RELATED EROSION
                           SERITUS ERC&ICN PROBLEMS CONTINUE WITH THE I.D. FAN ROTORS*
             AFFECTED  MODULES: SYSTEM

        ** PROeLEMS/SOLUTIONS/CCMMENTS
              STApT  DATE   9/77     EOUI'FMENT:  BOI LER-RELATf D
              END  DATf      9/77     f ROB lift : N OT  D E F INED /SPF CI F I ED
                           TJiE UNIT WENT  OFF LINE SEPTEMBER 3D FOR  A SCHEDULED OUTAGE TO REPAIR BOIL-
                           ER TUBES. DUKIM; THE  OUTAGE,  AN ATTEMPT WILL BE MADF TO CORRECT MANY OF THE
                           MECHANICAL  PRCFLEM&.
              AFFECTED  MODULES:
 10/77  SYSTEM                                                                 7*4

        ** PROBLEMS/SCLUTIONS/COKiPiENTS
              START DOTE  10/77      tGUIH-'ENT:  BOILER-RELATED
              END DATE    10/77      f'SOBLFM: NOT DEFINED/SPECIFIED                                  ,
                           UMT  8  WAi  OFFLINE FOR THE ENTIRE MONTH  DUR1N6   SCHEDULED  OUTAGE  FOR     \
                           REPAIR  OF 60IIER TUBES. DURING THIS PERIOD, MANY MECHANICAL AND  INSTRUMEN-
                           TAL  sCRuPCffc  IROBLEMS WERE
              AFFFCTED MODULES:  SYSTEF"
 11/77  8A
        8P
        SC
         >
        SYSTEM      86.0         te.O        86. 0        50. P                   7?0    41J       0

        **  PROfeLEMS/SOLUTlONS/cOMMtNTS
              START DATE   11/77      fcOUI I KENT: FGD SYSTgM, CENERAu
              END DATE     1^£7IN]7  "^'ROUiHT BACK IN SERVICE  ON  NOVEMBER  11  FOLLOWING  THE  SCHED-
                            ULED  flOUt R 01TA6E (AVAILABILITY hAS  CALCUATFD  FROM  NOVEMBFR  11  THROUGH
                            NOVEMBER  20>.
                       MODULES:  SYSTEM
        ** PRObLEMS/SQLUTIONS/COftMENTr
              START  DATE   11/77      EC

              END DATE     1 J (" 1 .D .. f ANS '"fA VE~ BEEN REFUILT  IN  AN  ATTEMPT  TO  CORRECT  THE CO**OSlON AND
                            DRIVE  MOTOR PROBLEMS.
              AFFFCTED MODULES:  SYSTEK
                                                 323

-------
EPA UTILITY  fGD  SURVEY: CECEPFJER  197F - JANUARY  1979
                                             SECTION  3
                     DESIGN  AMD  rFRFOfipAKF 6ATA  FOR  OPERATIONAL  FCD  SYSTEMS
------------------------------------------ PERFORMANCE  DATA ------------ — ------ - ---------- - ---------
PERIOD  MODULE AVAILABILITY  CPERARIHTY  IELIAB1L1TY  UTILIZATION  X  REMOVAL   PER  BOILER  FGO   CAP.
                                                                   SO?   PART. HOURS HOURS  HOURS FACTOR


        ** PROBLEMS/SOLUTION S/COKKENTE
              ST*KT BATE   11/77      EBUIFF'ENT:  6AS  DAMPER
              END DATE     11/77      PFOBLFM: C HEMI C AL-RELA TE D EROSION
                            G,S  LEAKAGE F''OM THt  DAMpERS WA$ CORRECTED  BY WELDING A COVER PLATE OVER
                            THE  SEAL tOCRr. THE  VENDOR  IS CURRENTLY  WORKING ON A NEW  DFjIGN FOR THE
                            DANPFRS.
              AFFECTED MODULES:  SYSTEM

        ** PROBLEMS/SOLUTIONS/COMMENTS
              START D*TE   11/77      ECIJ1 I f E NT:  INSTRUPENTAT 1 CM
              £ND DATE     11/77      C OUR f NTS:
                            ALMOST ALL INSTRUMENTATION  PROfcLFKS CONTINUE TO HAMPER PROPER SCRUBBER
                            OPERATION.
              AFFECTED MODULES:  SYSTEM
 12/77  8A
        EC
        80
        SYSTEM       5^.0         97.0         59.0        56.0                   74*    «26      0

        ** PROfcLEMS/SOLUTI ON S/C nWNENTS
              START  DATE   "(Z 111     E«UI(KENT:  B01 L ER-R E LAT f C
              END  DATE     1?/77     PS(;EilFH; NOT DEFINED/SPECIFIED
                            TH UNIT UAS  CFF-LINE FROM DECEMHER  20  -  DECEMBER 31  FOR  REPAIRS OF A
                           .PCILEU TUBE IFAK.
              AFFECTED  MODULES: SYSTEM

        ** PROBLEMS/SOLUTIONS/COKi«ENT!:
              START  DATE   12/77     EGU1FKENT:  SCRUBBER
              CND  DATE     12/77     COMMIT: PREVENTIVE MAINTENANCE
                            DLRINf THJS OITAGE,  AN INSPECTION WAS MADE  OF THE SCRUBBER  MODULES.
              AFFECTED  MODULES: SYSTEM

        ** PROtiLEKS/SOLUTIONS/CCMWENTS
              START  DATE   12/77     EOUIH«ENT:  SCRUPBEH
              END  DATE     1?/77     FPOBIEM: NOT DE FINE D /SPE CI F I ED
                            TKE RUPBFI- LIhER  WAS FOUND TO BE KISSING  IN SEVERAL  AREAS  OF ALL FOUR
                            MODULES *NC u t$  REPAIRED DURING THE  OUTAGE.
              AFFECTED  MODULES: SYSTEM

        8A
        8B
        8C
        8D
        SYSTEM       £6.0         96.0         96.0        79. C                   744    616      0

        ** PROBLEMS/SOLUTIONS/COMHENTE
              START  DATE    1/78     ESUlfKENT:  SCRUpBER
              END  DATE      1 /7S     PROBLEM: NOT D E FIN E D /S PF CI F I ED
                            ALL FOUR SCRUiPER MODULES RETURNED  TO  SERVICE THIS MONTH  FOLLOWING REPAIR
                            UtRK ON THE RUBER  LINER.
              AFFECTED  MODULES: sYSTll*

        ** PRO^LEMS/SOLUTI ONS/COMMENTS
              START  DATE    1/78     ECUIFPENT:  PIPING
              END  DATE      1/76     PROBLEM: NOT DE F IN ED /S PE CI F 1 ED
                            THERE HAVE BEFN  MINOR PROBLEMS  WITH  COOLIN6 LINES FREEZING AND EURST1N6.
              AFFECTED  MODULES: SYSTEM

        ** PR06LEMS/SOLUTIONS/COMMENTS
              START  DATE    1/78     E«UJF*ENT:  REAGENT HANDLING
              END  DATE      1/78     PFOBiEM: pLUGGINS, OTHER
                            FEED HOPPERS  *T  THE  LIMESTONE STORAGE  AREA HAVE  BEEN PLACING OUf TO  FROI-
                            Eh 6 C A VE L •
              AFFECTED  MODULES: SYSTEM
                                                  324

-------
                                              EPA UTILITY  FED  SURVEY: DECEMBER 1978 - JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PERFOPWAUCE DATA FOR OPERATIONAL  F6D SYSTEMS
......	PERFORMANCE  DAT*	
PERIOD MODULE AVAILABILITY  OPERAB1L1TY PLIABILITY UTILIZATION   t REMOVAL   PER  BOILER  FED   CAP.
                                                                  S02  PART. HOURS HOURS  HOURS FACTOR
•*•"""" "" "«•»" "" m*nm «.••• — — ••—•.—  -«_•_______ .. _ _ «w *••«..• _ — «..._«*.«*i  —•.••• «.•_«,,• *«..*.• —•*••—•• <**__.» — — - — - —

       ** PROBLEMS/SOLUTIONS/CCMMENTS
             START  BATE    1/78     EGU1FWENT:  REAGENT  HANDLING
             END PATE      1/78     PPOBltM: CHEMICAL-RELATED EROSION
                           ThE BAIL MILL SUMP PUMP LINER HAVE BEEN WEARING OUT.
             AFFECTED MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/CCMMENTS
             START  DATE    1/78     EBUIFMENT:  SPRAY NOZZLES
             END DATE      1/78     PROBLEMS C HE«1 CAL-RELAT F I) PLU6GING
                           SOME PLUGGING OF THE  VENTURI SPRAY NOZZLES WAS ENCOUNTERFD.
             AFFECTED MODULES: SYSTEM

       ** PROBLEMS/SOLUT10NS/CCMMENTS
             START  DATE    1/78     EBUIfMENT:  INSTRUMENTATION
             END  DATE      1/7B     FFfOBlFM: NOT DEFINED/SPECIFIED
                           IfcSTRUMENTATICN CONTINUES TO gE A MAJOR PROBLEM KITH OPERATION OF THF
                           SCRUBBER.
             AFFECTED  MODULES: SYSTEF

  E/78  8P
       8C
       8D
       8A
       SYSTEM       55.0        54.0        61 «C        47.d                  67?   5F6      0

       **  PROBLEMS/SOLUTIONS/CCKMENTS
              START  DATE   2 /78     tPUIl^'ENT:  F6D SYSTFMt GENERAL
              END DATE     2/76     CCKM(NTS;
                               THE  UTUITK  COMPANY REPODRTED THAT THEY COULD NOT ACCURATELY DETERMINE
                           RELIABILITY  BFCAUSE  OF THEIR INABILITY TO CALCULATE UNIT LOAD DEMAND ON A
                           DAILY BASIS,  GENERALLY  IT  IS ASSUMED THAT SYSTEM FORCED OUTAGE HOURS PLUS
                           TK HOURS  THE  F6D  SYSTEM  WAS OPERATED WILL GIWF ROU6LY THE HOURS  THt SYS-
                           TEM HAS  CALLEC  UPON  TO OPERATEf IN THIS WAY, RELIABILITY CAN BE CALCULATED
                           IhDIRECTLY.  BtfcEVER, IN THIS CASE,TWO TRAINS AT A TIME HAVE BEEN  DOWN ON  A
                           SCHEDUiED  OUTAGE  fQti NECESSARY MODIFICATIONS.  PART OF THIS OUTAGE TIME
                           LIMITED  EOILEi  OPERATION  SO  THAT THE UNIT CoULD NOT R(jN AT FULL LOAD WHEW
                           THERE WAS  DEMAND  FOR A FULL  LOAD. FOR THIS CALCULATION IT WAS ASSUMED THAT
                           THERE WAS  A  DEMAND  f OR FULL  LOAD DURING THE ENTIRE OUTAGE SO THAT ALL OF
                           THE TRAINS VOlLj)  HAVE BEEN  CALLED THE ENTIRE SCHEDULED OUTAGE.  THE PESULT
                           WAS A VERY CO^SERVATIVE ESTIMATE OF RELIABILITY WHERE HOURS CALLED=SYSTEM
                           FORCED  OUTAGE  TIME  6. SYSTEM  SCHEDULED OUTAGE TIME R HOURS THE FGP SYSTEM
                          OPERATED.
                               NOTE  -  THIS  IS  A  PEDCO ESTIMATE.
              »FFFcTjD MODULES:  SYSTEM

        ** PR06LEMS/SOLUTIONS/COMMENTE
              START DATE   2/78      ECUirMENT:  DUCTWORK
              END DATE     2/78      FFOEUfM:  NOT DEFINED/SPECIFIED
                           THE OUTAGE Tiff  FOR  TRAINS  A A*i 0 6 WAS RE8UIREP TO REPLACE THE  RUBBED
                           LINERS  IN  THE  DOWNCOMER AREA WITH STAINLESS STEEL. THE OTHFR TWO  TRAINS
                           WILL  RECIIVE SIMILAR TREATMENT.
              AFFECTED MODULES:  SYSTEM

  3/78  £A
        BF<
        fcC

        SYSTEM      60.0         i6.0         59.C         5F.C                   7*4       °

        *• PROBLEMS/SOLUTIONS/COMM£NT£
              START DATE   3/78      tGUIFMENT:   DUCTWORK
              END DATE     3/76      PSOCtFM: NOT DEFIMED/SPECIFI ED
                            TRAIN E  WAS  CIT OF SERVICE  MARCH  1-KARCH  13 TO INSTALL  STAINLESS  STtFL  IN
                            THE: AesoREfER ^ND  VENTURI DOWN  COMER  AREAS.
              AFFECTED MODULES:  W
                                                 325

-------
EPA UTILITY  FbD  SUPVF-Y;  DICHT1FR 197t • JANUARY  1979
                                             SECTION  3
                     DESIGN AND PfRFOPMKE  DATA  FOR OPERATIONAL F6D  SYSTEMS
----- .. ..... --- ... .................. ------ PmORMANCF CAT A ..... - -------------------- - ------ " .......
PERIOD MODUlf  AVAILABILITY CFERA^UITY  • C L1AB I L1TY  UTILIZATION  X  REMOVAL    PER  BOHER  ff.C    CAP,
                                                                  S02   PART.  HOURS HOURS  HOURS  FACTOR
»•»••• —»••••  • •••••*«»•••• •»•»•«•••••  ••>•»•••>«••!•*•  ••^•••••MMVVW •« • VOT  »•!•••*«•  * •• •• oi <• Ma M „, MB • •••*•  •••««*

       **  PROULIMS/SOLUTlONS/CO^f NT?
              START CATl   :/7?     tSUIH'INT!  EXPANSION JOINT
              tND DAT!     J/78     Pf>OPl>,Kt  NOT  0 E FINID/S PI CIFI ED
                           STAINLESS mU  COVfRS  WFRF INSTALLED AROUND  TWO  EXPANSION JOINTS ON  TRAIN
                           C IN ORDEf TP  PREVENT  FLUE GAS IFAKA6E.
              AFFICTED nODULES: 1C
        «*  PROUlEMS/SOLUTIONS/CCfWENT!
              START DATE   ?/?!',      ECUI^ENT:  GAS
              END DUE     7/7f      PROPLfW:  NOT DE F IKE D/5 Pf CI M ED
                           A STAINLESS  S1E6L  PLATE  WAS WELDED OVER  THF  INTRY BOOR OPENINGS TO TRAIN C
                           OtlTLIT ANE tYMSS  GUILLOT1NI DAMPERS  FOR THE PURPOSE OF ELIMINATING 6AS
                           LIAKAGE.
              AFFECTED MODULES;  EC

        **  PROBLtMS/SOLUTIONS/COHPENl f
              START DATE   3/78      ECUHTENT:  DUCTWORK
              END DATE     3m      I'POPlfM:  NOT DE FINED /t PF CI F I ED
                           TRAIN C  WAS  OIT  OF SERVICE MARCH U  -  Z9 TO  INSTALL STAINLFSS STEEL IN THE
                           ArSOPRER  AND  VFNTUR1  DOWNCOMER AREAS.
              AFFECTED MOpULtS:  fC

        **  PROBLEMS/SOLUTIONS/COKWENTS
              START DATE   3/7t      tGUKfENT:  REA6FNT HANDLING
              END DATE     3/78      FF.OPifn:  NOT DEFINED/SPECIFIED
                           SEVERAL  Lirtf f  BARS  ON THE FEEn AM)  DISCHARGE ENDS OF THE PALL KILL WERE
                           FCiUNC TO  tt  BAPLY  WORN.
              AFFECTtD MODULES:  SYSTfC

        **  PROOLEMS/SOLUTIONS/COKiMENTS
              START DATE   3/7t      t'OUI fWENT:  TRANSFER PUMP
              END DATE     J/7t      fKOPfH:  C HEMI C AL-RfLAT E S> EROSION
                           T»:E  UTILITY  HAS  HAD  WEAR PROBLEMS WITH THE  SlUPRY SUMP Piil".P LINERS AT THE
                           BALL  KILL.
              AFFECTED MODULES:  SYSTIW
  4/78  8A
        8E>
        8C
        SYSTEM      69.0         fJ.C        67.0        62. C                   72C    540      T

        ** PROBLEKS/SOLUTIONS/COKMENTS
              START DATE    4/78      E-CUI H"-ENT: MIST ELJM1NATCP
              END DATE      4/78      FRCPUM: C HEMI CAL- RELATE C  PLUGGING
                            DLRINC A  E.flff INSPECTION OF THE  SCRUEBIN6  SYSTEP IN EARLY APRIL, SOLIDS
                            IEPOSIT10N WAf NOTICED IN THE MIST  ELIMINATOR SECTION OF  ALL  TRAINS  DUE TO
                            PLUGGING  THAT  HAD OCCURRFD IN SEVERAL  OF  THE MIST ELIMINATOR  SPRAY NOZZLES
                            TRAIN D WAS N CT IN OPERATION FOR  17  DAYS  WHILE THE MIST ELIMINATOR HAS
                            DISASSEMBLED «D CLEANED.
              AFFECTED  MODULES:
        «* PR06LEMS/SOLUTIONS/COMMENU
              START  DATE    4 /7B      EGUIFKENT: FGD SYSTEM,  GENERAL
              END DATE      4/78      FKOPIFM: NOT D E FINED/SPF CI F IED
                            «  STAlNLfjSS S1EEL LIN" WAS INSTALLED  ON THE SLOPING SECTIONS  OF  THE
                            AtSOREIER AMD VFNTURI.
              AFFECTED MODULES:  SYSTEM

        •* PR06LEMS/SOLUT10NS/COMMENTS
              START  DATE    4/78      tCUIFFENT: 6AS DAMPER
              END DATE      4/78      fPOE< LF.M : NOT 0 E FINED/SPE CI F I ED
                            STAINLESS STEH  PLATfS WFRE INSTALLED  OVER THE ENTRY DOOR  OPENINGS TO TRAI
                            D  INLET, OUTLIT  AND BYPASS GUILLOTINE  DAMPERS TO REDUCE GAS  LEAKAGE.
              AFFECTED MODULES:  6D
                                                 326

-------
                                               EPA UTILITY  FGD SURVEY: DECEMBER  1978  - JANUARY 1979
                                             SECTION 3
                     DESIGN AND PERFORMANCE DATA FOR OPERATIONAL F60 SYSTEMS
	.	PERFORMANCE  DATA	
PERIOD NODULE  AVAILABILITY CPERARIL1TY PLIABILITY  UTILIZATION  X REMOVAL    PER   BOILER  F6D   CAP.
                                                                   S02  PART.  HOURS HOURS  HOURS FACTOR


       ** PRObUEMS/SOLUTIONS/COKMENIT
              START  DATE   4/7B      ESUIhWENT:  EXPANSION JOINT
              END  DATE     4/78      FfOPlfM: NOT DEFINED/SPECIFIED
                           STAINLESS STElL COVERS  WERF  INSTALLED AROUND  THE  FIVE  EXPANSION JOINTS ON
                           TRAIN  Pi  TfcO EXPANSION  JOINTS ON TRAIN «, AND ONE EXPANSION JOINT ON TRAIN
                           B  TO  REDUCF 6 AS LEAKAGE.
              AFFFCTED MODULES:  8A     R f      £D

       ** PROBLEMS/SOLUTIONS/COPMENTS
              START  DATE   4/78      EOUI^^'ENT:  TRANSFER PUMP
              END  DATE     4/78.     FFOEUtM: CHEMICAL-RELATED EROSION
                           TURF  CONTIKUtS TO  BE A  WEAR PR OB LE« VI TH PUMP  LINE RS  AT THE BALL MltL. NT)
                           CAUST  OR  SOLUTION OF THE  PROBLEM HAS BEEN ASCERTAINED  AS YET.
              AFFECTED WOPULtSt  SYSTIK

  5/7*   SYSTEM                                                                   744

  6/7«   SYSTEW                                                                   730

  7/7E   SYSTEM                                                                   744

  8/7?   SYSTE«                                                                   744

  9/7?   SYSTt*                                                                   720

 10/7S  SYSTEI*                                                                   744

        ** PROBLEMS/SOLUTIONS/COMMENTS
               START  DATE   1P/7P     tCUll«ENT: BOILER-RELATED
               tND DATE      1/79     IPMCHNT: PREVENTIVE MAINTENANCE  SCHEDULED UNIT OUTAGE
                            THE pCILE*  ^•E^T  OFF LINE IN  EARLY  OCTOBER FOR BOILER  OVERHAUL.   THE UNIT
                            RESTARTED  FOR  A  FEW DAYS IN  DtCEM&ER  UNT1LL  A TURBINE ROTOR  PROBLEM
                            WAS DISCOVERED.  THE PROBLEM  FORCED THE  UNIT  OFF  LINE  THROUGH JANUARY.
               AFFECTED  MODULES:  SYSTtf!

 11/7F  SYSTEM                                                                  72°

 12/78  SYSTEM                                                                  74*

   1/7"?  SYSTEM                                                                  7**

-------
FPA UTILITY FtD SURVEY:  DECtMBFR 197? - JANUARY 1979
                                            SECTION  3
                     DESICN  AND PE R FOSM A f,f f DATA FOR OPERATIONAL FGD SYSTrPiS
 COMPANY NAPE
 PLANT NAME
 UNIT NUHPER
 CITY
 STATE
 RF6ULAICRY CLASSIFICATION
 PARTKUIATE  EMISSION  LIMITATION - NG/J
 SO? EMISSION  LIMITATION - KG/J
 NfT PLANT  GENERATING  CAPACITY - *V
 6ROSS UNIT GENERATING CftPAcUY - Mk
 NET UNIT GENERATING CAPACITY W/FGD - Pi
 NFT UNIT GENERATING CAPACITY WO/FGC -  ffc>
 EOUIVAL'NT  SCRUFBED CAPACITY - P.«

 ** BOILFR  tATA
     SUPPLIER
     TYPF.
     SERVICE  LOAD
     COMMERCIAL SERVICE DATE
     MAXIMUM  bOlLER FLUE GAS FLOW - CU.f/S
     FLUF GAS  TEWPFRATURf - C
      STACK  HE IGHT - H
      STACK  TOP DIAMETER - P.

 **  FUEL  DATA
      fU£L TYPt
      FUEL  GRADE
      AVERAGE  HEAT CONTENT - KJ/KG
      RANPE  HEAT CONTENT - FID/lEt
      AVERAGE  ASH CONTENT -  !
      RANGE  ASH CONTENT  - %
      AVEPA6E  MOISTURE CONTEM  - S
      RANGE  MOISTURE CONTFNT -  *
      AVERAGE SULFUR CONTENT -  X
      RANGE  SULFUR CONTENT - I
      AVERAGE CHLPRIOt CONTENT  - I
      RANGE  CHLORIDE CONTENT -  X
      FUEL  FIRING RATE - IX T/H
      FUEL  FIRING RATE - MK

  • * ESP
      TYpE

  *• FGD SYSTEM
      SALEAPLT  PRODUCT/TKROWAWAY PRODUCT
      GENERAL PROCESS  TYPE
      PROCESS TYPf
      SYSTEM SUPPLIER
      DEVELOPMENT LEVEL
      NEy/RETkOFIT
      PARTICULATE DESIGN  RERCVAl EFFICIENCY
      S0£ DESIGN  REPOVAL  CFFK1FNCY  -  t
      COMMERCIAL  DATE
      INITIAL START-UF>

  ** ABSORBER
    TYPF
    INITIAL START UP
    SUPPLIER
    NUMBER OF STAfES
    DIMENSIONS
    BOILER LOAD/APSORRER  -  X
    GAS FLOW - CU.M/S
    GAS TEMPERATURE -  C

** CENTRIFUGt

    OUTLET SOLloS - X

** FANS

    TYPF
                                                               <  .ICO LP/MMBTU)
                                                               ( 1.200 L6/HWBTU)
TEXAS UTILITIES
MARTIN LAKH
1
TATUM
TEXAS
A

  51A.'
 3000.0
  793,0
  750.0
* ******
  595.0
                                               COMBUSTION ENGINEERING
                                               PULVF.RIZED COAL
                                               BASE
                                                 0/77
                                                 U9<.51        (SU7000 ACFK)
                                                  16?.3        ( 335 F)
                                               ******          (**** FT)
                                               *******        (***** FT)
                                                COAL
                                                LIGNITE
                                                 17166.

                                                    P.PO
                                                ******
                                                   33.00
                                                ******
                                                     .90
                                                ******
                                                ********
                                                ******
                                                  «53.5
                                                * ****
                                                COLD SIDE
                                                THROUAWAY PRODUCT
                                                WET SCRUBBING
                                                LIMESTONE
                                                RESEARCH COTTRELL
                                                FULL-SCALE
                                                NEW
                                                   99.40
                                                   71.00
                                                 8/77
                                                 4/77
                                                  PACKED SPRAY TOKFR
                                                   4/77
                                                  RESEARCH COTTRELL

                                                  28 DIA. X 1CO TALL
                <   7380 BTU/LB)
                 ***** *
                (500 TPH)
                                                    177.13
                                                    162.f.
                                                     69.0
                                                  BOILER I.D.
                C 375350 ACFH)
                (  325 F)
                                                 328

-------
                           FPA  umm rco SURVEYS  DECEMBER me - JANUARY  1979
                         SECTION 3
OESICN  AND  PFRFORKAtyCE  DATA  FOR OPERATIONAL  F6D  SYSTEMS
** HIST ELIMINATOR
    NUBPEp
    TYPE

,* REHEATER
    TYPE
    TEMPERATURE  BOOST - C

** THICKENER
    TYPE
    DIAMETER  -  »
    OUTLET  SOLIDS - X

 ** MATER LOOP
    TYpf
    FRESH fAKEUP  WATER ADDITION - LITEKS/S

.** TREATMENT
    TYpE
    SUPPLIER
    PRODUCT CHARACTERISTICS

 ** DISPOSAL
    NATURE
    TYPE
    LOCATION
    TRANSPORTATION
                              12
                              CHEVRON
                              UY PASS
                                 40.0
                                                 6RAV1TY
                                                     4?. 7
                                                     35.0
                              CLOSED
                                 34.6
                                              {    7?  F)
                                              (140 FT)
                                              (   550 GPM)
                              FLYASH STABILIZED
                              NONPROPRItTARY
                              CENTRIFUGE  ScLIDs  MIXED «ITH FLY ASH
                              FINAL
                              LANDFILL
                              ON-SlTE
                              RAIL
PERIOD MODULE AVAILABILITY  OPERAttUlTV
                                          -PERFORMANCE. DATA
                                         KfcLlAB I LITY  UTILIZATION
                                               t REMOVAL   PER  BOILER   F6D    CAP.
                                               S02  PART. HOURS HOURS   HOURS  FACTOR
8/77 SYSTEM
9/77 SYSTEM
10/77 SYSTEM
744
7?0
744
       **  PRObLEHS/SOLUTIONS/COI^iENTS
             START DATE   10/77     ICUI O'.ENT :  F60 SYSTEM,
             fcN6 D*TE      1/78     COBCfK'TS:
                           INSTALLATION  IF  THE  LIMESTONF SCRUBBING  SYSTEM AND THE ESP WAS COMPLETED
                           BY OCTOBER 1977.  THF  INITIAL OPFRAT1N6  Ph*SE IS EXpECTED TO CONTINUE
                           THROUGH Tht  FIRST BUARTER OF 1978.   COMPLIANCE TESTING  fc'AS CONDL'CTetl  jN
                           LATE 1977 AND CERTIFICATION OF COMMERCIAL  AVAILABILITY IS AWAITED.
             AFFECTED MODULES: SYSTEC

       **  PROBLEMS/SOLUTIONS/COf;l«ENTJ
             START DATE   10/77     ECUIfKENT:  REAGENT HANDLING
             tND DATE      1/78     FRteUH: NOT  DE FINE D/S PF C] F I ED
                           THE  UTILITY  E >PE R1E ti CE t> SQWE DIFFICULTIES
             AFFECTED MODULES: SYSTt?
11/77

12/77

 1/7E

 2/78
       SYSTEM

       SYSTEM

       SYSTEM

       SYSTEM
                                                   IN THE SLURRY  HANDLING SYSTEM.


                                                             720

                                                             74<

                                                             744

                                                             67Z
       **  PROBLEMS/SOLUTIONS/CCMWENTT
             START DATE    217%     ECUIfMENT:  FGD SYSTEM,  GENERAL
             END DATE.      3/78     CCKMbNTS:
                           CEKTIFICATICN VAS  RtCIEVEO FROP  THE  EPA  DURING THE PERIOD.
                          FGD SYSTEM OPE FATED THROUGHOUT THE  PERIOD.
             AFFECTED MODULES: SYSTEM

       **  PROBLEMS/SOLUTIONS/COMMENTS
             START DATE    ? /78     E6LIIS-ENT:  REAGENT HANDLING
             END DATE      J/7B     PPCBiFH:  NOT D E F IN E D/ S P F CI F I ED
                                                                           ^   „ ...K
                                                                      THF BOUFR AND
                             J29

-------
fPA UTILITY  FGD  SURVEY;  DiftKBFR 197F  -  JANUARY 1979
                                             SECTION 3
                     DESIGN AND PERFOFMAKE  DATA FOR OPERATIONAL  FED  SYSTEMS
------------------------------- . ---------- PERFORMANCE DATA --------------------------- - --------------
PERIOD  MODULfc  AVAILABILITY OPERABUITY  PLIABILITY UTUI7AT10N   X  REMOVAL   PER  BOILF.R   FGO   CAP.
                                                                   S02  PART. HOURS HOURS   HOURS FACTOR

                           THC UTILITY  I*  STILL HAVING SOME  PROBLEMS WITH THE SLURRY HANDLIN6 SYSTEM.
                           SOME FORCED  OITA6E  TIME  OCCURRED.
              AFFFCTED MODULES: SYSTfH

  3/73   SYSTEf                                                                  744

  4/7*   SYSTEM                                                                  7?G

        **  PRObLEKS/SOLUTIONS/COMMENTS
              START DATE   A /7£      tOUII-t»ENT:  FGD  SYSTEM, GENERAL
              END DATE     5 /7?      COKMktvTSl
                           THE UNIT  WAS  1AKEK  OFF L1NF IN APRIL  FOR A^  ANNUAL TWO WEEK OUTAGE*
              AFFECTED MODULES. SYSTEM

        •*  PRObLEMS/SOLUTlONS/COMMENTS
              STAfT DATE   4/78      t6UIH*ENT:  BOILER-RELATED
              END DATE     5/78      COHHLNTS:
                           GENERATOR PROitEMS  WERE  ENCOUNTEPE0  IK WAY CAUSING THE UNIT TO BE  TAKEN
                           OFF LINE  1HROICH  TH f END OF THE I«CNTH.
              AFFECTED MODULES: SYSTEM

  5/78   s>STEI»                                                                  74«

  6/7S   SYSTEM                                                                  7?0
              STAPT  DATE    6/78      tBUjPENT: GAS BAMpER
              END DATE      7/78      PROBlfcM: NOT Of FINE B/S PF tl FI ED
                            THt  DAMPERS FIR EACH ABSORBER MODULE  WERE  NOT FUNCTIONING  PROPERLY.   IT
                            HAS  BEEN  IfiPO iSIBLE TO ISOLATE INDIVIDUAL  MODULES FOR REPAIRS  (THE  E*'T1RF
                            SYSTFf  WOUU t*VF TO ElE SHUT DOWN  IF  REPAIRS UFRf RtOUIRFC  ON  ONLY  ONE
                            MODULE).
              AFFECTED MODULES:  SYSTtf:

        ** PRObLEMS/SOLUTIONS/COMMENTS
              START  DATE    6/7*      EQUIPMENT: F6D SYSTEM,  GENERAL
              tND DATE      7>76      COKUFNTSl
                            TKE  CNIT  1£ O'FRATING COMMERCIALLY.
              AFFECTED MODULES:  SYSTEM

        *« PRO&LEMS/SOLUTIONS/COfiMENTS
              START  DATE    6/7B      EOUI^ENT: PROCFSS CONTROL
              END DATE      7/78      PROPIFK: NOT DE FINEB/S PF CIFI.EB
                            TKfRF HAVE B E f-N PROBLEMS WITH THE  PH  METERS.  THE MITERS  HAVE  NOT OPERATED
                            PROPFRLY  FOR JOME TIME NOW.
              AFFECTED MODULES:  SYSTEM

  7/78  SYSTEM                                                                   744

  S/7e  SYSTEM                                                                   744

        t* PROBLEMS/SOLUTIONS/COMMENTS
              ST«RT  »*TE    8/78      EeUIFt'ENT: CAS DAMPER
              tND DATE      9/78      PROBLEM: NOT DEFINED/SPECIFIED
                            ISOLATION tjAMffR PROBLi«S CONTINUE"*
              AFFECTED MODULES:  SYSTEM

        «* PROBLEMS/SOLUTIONS/COMMENTf
              START  DATf    8/76      tCUI^ENT: F6D SYSTEM,  GENERAL
              END DATE      9/78      CPKM'JuiTS:
                            THE  DMT  CONTINUES TO REOUIRE EXCESSIVE  MAINTENANCE.   FGD STSTEM ACCEPT-
                            ANCE  TEST VERl PERFORMED BY THE  UTILITY  DUR1N6 AUGUST.   RESULTS ARE NOT
                            YET  AVAILABLE .
              AFFECTED MODULES:  SYSTEM

        ** PROfaLEMS/SOLUTIONS/COPMENTS
              START  DATE    f /78      EOUI^ENT: INSTRUMENTATION
              END DATE      9/78      FfiCELEM: NOT D E F INED /S Pt CI F I ED
                                                 330

-------
                                             EPA UTILITY  F6D  SURVEY:  DECEMBER  1?78  -  JANUARY 1979
                                           SECTION 3
                    DESIGN AND PERFORMANCE DATA FOR OPERATIONAL  FGD  SYSTEMS
..................................... ---- -PERFORMANCE  BAT A- — - — -—-—- ------ ......... ___ ........
PERIOD MODULE  AVAILABILITY CPERAPILITY  PEL1ABIL1TY  UTILIZATION   *  REMOVAL    PER   SOHER  FGD   CAP.
 ____ ............ ____ ..............                           SOZ   PART.  HOURS  HOURS  HOURS  FACTOR

                          FLOW MJASUSIM1NT  IN STRUMf NT AT JON  HAS  BEEN  FAILINe!"""
             AFFECTED MODULES: SYSTEM

       ** PROBLEMS/SOLUTIONS/CCMMINTS
             START DATE   1/71      ICtlltMNTs  ESP
             END DATE     9/7B      CO("«tf,TS;
                         OPACITY HAS BEiN HIGHER THAN  IXPiClfD  (20-25XJ  RESULTING  FROM ESP PROI-
                          LEMS,
             AFFfCTEB MODULES: SYSTIf

 »m  iw««                                                                 no

 10/78  SYSTEM                                                                 744

       ** PROBLEMS/SOlUTIONS/CCI*MENTS
             START DATE  10/78      IfiUI FPENlt  FGD  SYSTEM,  6INERAL
             END DATE    11/7?      CMrMNTS:
                          NC  PROBLEMS  H»VE  BlfN REPORTED.
             AFFECTED MODULES:  SYSTEM

 11/78  SYSTEM                                                                 720

 12/7B  SYSTEM                                                                 744

       ** PR06LEMS/SOLUTIONS/CCKMENTS
             START DATE  12/78      ttiUI'l£NT:  StUDC-E DISPOSAL
             tND DATE      1/79      PRCeil-M: NOT D E FINEO/SPF CI F IED
                           Tht FGD  SYS1EI* MAS SHUT  DOWN WHILE THE BOTTOM  ASH PONIl  WAS  CLEANED OUT.
                           TK UTILITY  H*J  BEEN DUMPING SlUBtf INTO THE POND WHICH  WAS DESIGNED FOR
                           BOTTOM  ASH CNIY.   ALSO SLUDGE IS PRODUCED  FASTER  THAN IT IS REMOVED  6V RAI
                           CAR.   THE UTILITY IS NOT  GETTING RAIL CARS FAST  ENOUGH.   THE ACTUAL
                           PROBUM  IS RE SPORTEDLY IN THE. DENATURING SYSTEM.
             AFFFCUD  MODULES:  SYSTEM

        • *  PDOEILEMS/SOLUTIONS/COMPENTS
             STA^T D6Tt   12/7E      tiGUI f fiENT: MIST  ELIMINATOR
             END  DATf      1/79      PROB L« W  : NOT D f  FINED/SPf CI FI ED
                           SCMie  MIST ELIMNATOR WASH PRO£jLt'"S WERE  ENCOUNTERED.
             AFFECTED  MODULES:  SYSTTM

        **  PROiJLEMS/SOLUTIONS/CCMI'INTE
             START DATE   1J/7B      EfiUI^'iENT: F6D  SYSTEM, GENERAL
             END  DATE      1/79      COMWtNTSs
                           THf FED  SYSTEf HAS REPORTEDLY RAN WELL DURING DECEMBER  AND  JANUARY.
             AFFECTED  MODULES:  SYSTEM

        **  PROLiLEMS/SOLUTIONS/COMMENTS
             START  DATE   12/78      tfiUllHENT: BOI LFR-RELAT f 0
              tND  DAT!      1/79      PKCBIKM: Wi ATHER-R tLATE D COMPONENT FAILURE
                           CCAL HANDLING k'AS A SIRIOUS PROBLEM DUI  TO FREEZING OF  THE  COAL  IN  THE
                           HOPPERS.  THIS PROBLEM EFFECTED ALL UNITS AT MARTIN LAKE FORCING  THE GAS
                           AND OIL  UMTS TO CARRY THI LOAD.
                       MODULES:  SYSTEM
        *«  PR06LEMS/SOLU1IONS/COMMENTS
              START DATE  12/78     tOL'IMENT: FGD SYSTEM, GENERAL

                   *       THE SCRUPB1NG SYSTEM WAS SHUT BOWN FOR A TI«E DURING THE REPORT PERIOD.
              AFFECTED MODULES: SYSTEM

  1/79  SYSTEM                                                                744
                                                331

-------
FPA UTILITY FtD SURVEY;  DECEfbER  I'm  - JANUARY 1979
                                            SECTION 3
                     DESKN  AND  PERFORMANCE DATA FOR OPERATIONAL  FGD  SYSTTHS
 COMPANY
 PLANT NAKF
 UNIT NUMF'ER
 CITY
 STATE
 REGULATORY  CLASSIFICATION
 PARTICIPATE  EMISSION  LIMITATION - NG/J
 S02  EMISSION  LIMITATION  -  IsG/J
 NET  PLANT  GENERATING  CAPACITY - MW
 GROSS UMT  GENERATING CAPACITY - ^
 NET  UNIT GENERATING  CAPACITY W/F6P - Mi
 NET  UNIT GENERATING  CAPACITY HC/FGl - *V
 EOUIVALFNT  SCRUEBCO  CAPACITY - MW

 ** BOILER  DATA
      SUPPLIER
      TYPf
      SERVICE LOAD
      COMMERCIAL SERVICE DATE
      MAXIMUM C01LER FLUE  GAS FLOW - CU.r/S
      FLUF FAS  TtMPf RATURT - C
      STACK  Hf 16HT  - I"
      STACK  TOP DIAKETtR - H

 **  FUEL  DATA
      FUEL TYPE
      FUEL GRADE
      AVERAGC HEAT  CONTENT - KJ/K6
      RANfE  HbAT CONTENT - HTU/LF
      AVERAGE A$H CONTENT - 1
      RANfE  ASH CONTENT - X
      AVERAGE MOISTURE  CONTENT - X
      RANGE  MOlSTURf CONTENT - Jf
      AVEM61 SULFUR CONTENT - t
      RANGE  SULFUR  CONTENT - %
      AVERAGE CHLORlDr  CONTEM - K
      RANBE  CHLORIOF CONTENT - *
      FUEL  FIRING RATI,  - ? T/H
      FUEL  FIRIN& RATE  - MU

  **  F.SP
«* FGD SYSTEM
    SALEABLE PRO OUCT/T HR OW AWAY PRODUCT
    6ENFRAL PROCESS TYPE
    PROCESS TYPE
    SYSTEM SUPPLIfR
    DEVELOPMENT LEVEL
    NEW/RFTROF1T
    PARTICULATt OES1UN REMOVAL EFFlCIEtitY
    S02 DES1C.N RiWOV
    INITIAL START-UP

•« AbSORBER
                         EFFICIENCY - it
    lYPt
    INITIAL START UP
    SUPPLIER
    NUMBER OF STAGES
    DIMENSIONS
    BOUER LOAD/APSORBER
    GAS FLOW - fU.M/f
    6AS TFMPCRATURE - C

** CENTRIFUGE
    OUTLET SOLIDS - *

*• FANS
    NUMBER
                                                               (   .100  LP/MMPTU)
                                                               (  1.200  LP/MMBTU)
TEXAS UTILITIES
MARTIN LAKE
?
TATUf
TEXAS
A
   41.
  516.
 3POO.O
  79?.D
  750.0
*******
  595.0
                                               COMBUSTION ENGINEERING
                                               PULVEKI2FD COAL
                                               BASE
                                                0/7?
                                                1494.51        C3167000  ACFM)
                                                 16P.J         (  335  fl
                                               ******          (****  FT)
                                               *******         (*****  FT)
                                               COAL
                                               LIGNITE
                                                17166.

                                                   P.00
                                               ******
                                                  33.00
                                               ******
                                                     .90
                                               ******
                                               ********
                                               ******
                                                 457.5
                                               *****
                                                 COLD  SIDE
                (   7380  BTU/LR)
                ***** *
                (SCO  TPH)
           PRODUCT
WET SCRUBBING
LIMESTONE
RESEARCH  COTTRELL
FULL  SCALE
NEW
   99.40
   M.OO
  S/7C
                                                 PACKFD  SPRAY  TOWER
                                                   5/78
                                                 RESEARCH  COTTRELL
                                                      3
                                                 28  DIA. X  JCO TALL
  •* MIST ELIMINATOR
      NUMPER
                                                    177.13
                                                    162. *
                                                     69.0
                                                 BOILER  1.6.
                                                  12
                                                  CHEVRON
                ( 375350 ACF«)
                (  325 F>
                                                 332

-------
                                             EPA  UTILITY FGD SURVEY: DECKER 1978 - JANUARY 1°79
                                           SECTION 3
                   DESIGN AND PERFORMAUCE  DATA  FOR OPERATIONAL FGD SYSTEMS
*« RENEATEN
    TYPE
    TEMPERATURE BOOST - C

** THICKENER
    NUMBER
    TYPE
    DIAMETER - M
    OUTLET SOLIDS - X

** WATER  LOOP
    TYpF
    FRESH N«K£UP WATER ADDITION  -

** TREATMENT
    TYpE
    SUPPLIER
    PRODUCT CHARACTERISTIC!!

«* DISPOSAL
    MATURF
    TVPI-
    LOCATION
    TRANSPORTATION
                                               BY PASS
                                                  40.0         (    7?  f)
                                               GRAVITY
                                                   42.7
                                                   35.0
                                               CLOSED
                                                   34.6
                                      (UO FT)
                                                               (   550  6PM)
                                                FLYASH  STAfillZATION
                                                NONPROPRIETARY
                                                CENTRIFUGE  SollDs  MIXED  «1TH  FLY  ASH
                                                FINAL
                                                LANOFUL
                                                ON-SITE
                                                RAIL
...	_			PERFORMANCE DATA-------	„—..--.		
PERIOD MODULE AVAILABILITY  CPERAiILITY PLIABILITY UTILIZATION  X REMOVAL   PER  BOILER  FED   CAP.
                                                                SOS  PART. HOURS HOURS  HOURS FACTOR
 5/76  SYSTEM

 6/78  SYSTEM
11/78

12/78
                                                                             744

                                                                             720
       **  PROaLtMS/SOLUTIONS/COMKENTf.
             START  DATE    6/78     LCUII"ENT: FED SYSTEM, GENERAL
             END  DATE      7/7fc     CCMfUNfS:
                          TH UNIT hf6A^ OPERATION? IN MAY  197E. THE  CO«»LIANCr TESTING IS SCHfDUL-
                          ED FOR AUGUST .
             AFFECTED  MODULES: SVSTtK
 7/78  SYSTEM
 sm
                                                                              744

                                                                              7**
      ** PROeLEI"S/SOLUTIONS/COK«INTS
            START DATE    £/7f
            END DATE
                                               FGD  SYSTEM,  GENERAL
                          9/78     COMMITS:
                          TH F6D SYSTf WAS TESTED  FOR COMPLIANCE  WITH ALL  SIX MODULES IN  THE 6AS
                          SWAM DURJN6 THE FIRST  PART OF  AUGUST.   TEST RESULTS HAVE  NOT Y6T BfEN
                          PbfaiSHED.  tit, NAJOR  F6D-RELATCD  FROBLEMS WERE  REPORTED.
             AFFTCTFO  MODULES: SYSTEM
 9/7P  SYSTEM

10/78  SYSTEM
10/78
11/78
            START DATE
            END DATE
             AFFECTED  MODULES: SYSTEM
                                   EfiUirtt'ENT:  f6D  SYSTEM,  SENERAL
                                          S:
                                          RESULTS  ARS
       SYSTEM
                                                                              744
                     .
             START DATE  12/78     ECUIIIItNT:  eOuEH-HFLATF I)
             END DATE     1/79     FROB IFH : Wf. ATHE R-R EL AT ED  COMPONfNT  FAILURE.
                          CCAL HANDLING WAS A  SIR10US  PROBLEM  DUi  TO  FREF.MN6  OF THE COAL  IN THE
                                                353

-------
EPA UTILITY FbD SUPVCY:  OECtNPFR  1*7f  - JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PERFOSMkCE DATA FOP OPERATIONAL  FfiO  SYSTF.MS
PERIOD MODULI AVAILABILITY  OPERAflLlTy
                                        ... PER f ORNANCF 6 AT A ----
                                        TLlAeiLlTY UTILISATION
                                                                 X REMOVAL    PER  BOILER  FED   CAP.
                                                                 SC2   PART.  HOURS HOURS  HOURS FACTOR
                           HOPPtfiS.   1H1'  PBOBLfM EFFFCTED ALL UNITS  'T  MARTIN  LAKE  FORCING THt CAS
                           AND  OIL  UNITS TO CARRY THE LOAD.
              AFFECTED  MODUL IS: SYSTEM

        **  PRC&LEMS/IOLUTIONS/CCMINTS
              8TA|)T  DATE   12/7g     t till f» SNTJ  F6t> SYSTEM, GtNERAL
              END  DATE      1 /79     CCO'kTSt
                           NC PROBLEMS H/'VE feftN REPORTED.
                           PIHKD.
              AFFtCTED  MODULES: SYSTEM SYSTEM

        •*  PROBLEMS/SOLUTIONS/COMMENTS
              STA^T  DATE   12/78     tGLT^ENT:  F6D SYSTEM, OblVERAL
              END  DATE      1 /79     tCI-l" 'ATS:
                           TKf  FCD  H*f R!FORTEDLY RAN MELL DURING DECFMPiF  AhD  JANUARY.
              AFFECTED  MODULES: SYSTEM

        **  PROgLEMS/SOLUTIONS/CCMMENTS
              STApT  DATE   12/78     COUIifENT:  SLUDGE DISPOSAL
              END  DATF      1/79     FRCBHK: NOT DE FINEtl/SPF CI F IID
                           TliE  FRD  5VSU6  WAS SHUT DOWN WHILE THE BOTTOM ASH  POND WAS CLEANFD OUT.
                           ThE  UTILITY H 
-------
                                             EPA UTILITY FGB SURVEY: DECEMBER  1978  -  JANUARY  1979
                                           SECTION 3
                   DESIGN  AND  PERFORMANCE  OATA FOR OPERATIONAL  F6D SYSTEMS
COMPANY  NAPE
PLANT NAME
UNIT  NUPBEfi
CITY
STATE
REGULATORY  CLASSIFICATION
PARTKULATE fcMISSION LIMITATION  - hC/J
50! EMISSION  LIMITATION  -  KG/J
NET PLANT GENERATING CAPACITY  -  MY
6ROSS UNIT  GENERATING  CAPACITY  - *W
NET UNIT GENERATING CAPACITY V/FGD - M k
NET UNIT GENERATING CAPACITY VO/FGD - PI.
EQUIVALENT  SCRUBBED CAPACITY -  fW

** BOILER  DATA
    SUPPLIER
    TYPE
    SERVICE  LOAD
     COMMERCIAL SERVICE DATE
    MAXIMUM  cOHER  FLUE GAS FLOW --CU.»/S"
     FLUE GAS TEMPFRATURF - C
     STACK  HE IGHT  -  N
     STACK  TOP  DIAMETER - t»

 *« FUEL  DATA
     IUEL TYPE
     FUEL GRADE
     AVERAGE  HEAT  CONTENT - KJ/KG
     RANGE  HEAT CONTENT - BTU/LB
     AVERAGE  ASH  CONTENT -  5
     RANfiE  ASH  CONTENT  - X
     AVERAGE  MOISTURE  CONTENT - X
     RANGE  MOISTURE  CONTENT - X
     AVERAGE  SULFUR  CONTENT - X
     RANGE  SULFUR  CONTENT - X
     AVERAGE  CHLORIDE  CONTENT - t
     RANGE  CHLORIDE  CONTENT - *
     FUEL FIRING  RATt.  - I* T/H
     FUEL FIRING  RATE  - MH
               (****** L8/MM8TU)
               <****** LB/MMBTU)
TEXAS UTILITIES
MONTICELLO
3
MT. PLEASANT
TEXAS

******
* *****
 1900.0

  75olo
*******
  800.0
COMBUSTION ENGINEERING
PULVERIZED COAL
BASE
 om
******•»*•        (******* «CF«)
  16?.3         {  335  F)
******          (****  FT)
*******         (*****  FT)
COAL
LIGNITE
   18.90
********
******
     1.50
******
      .04
******
                (******  BTU/LB)
                 6500-7500
                (***  TPH)
  »* ESP
     TYPf
     SUPPLIER
     PARTICIPATE DFS1GN REMOVAL EFFICIENCY
     FLUE  GAS TEMPERATURE -  C

  ** F6D SYSTEM
     SALEABLE PRODUCT/T HR OW AWAY PRODUCT
     GENERAL PROCESS TYPE
     PROCESS TYPE
     SYSTEM SUPPLIER
     DEVELOPMENT LEVEL
     NEW/RETROFIT
     PARTICIPATE DESIGN REMOVAL EFFICIENCY
     S02 DESIGN PEMOVAL FFFICIEfcCY  -  X
     COMMERCIAL DATE
     INITIAL START-UP

  ** ABSORBSR
     TVPF
     INITIAL START UP
     SUPPLIER
     NUMBER OF STAGES
     BOILER LOAD/APSORBER  -  X
     GAS FLOW - CU.M/S
     GAS TEMPERATURE -  C
     LIOUID REC1RCULATION  RATE  -  LITER/I
     L/6 RATIO . L/CU.R
     PRESSURE DROP - KPA
     PARTjCULATE IK'LTT  LOAD  -  G/CU>K
     PARTKULATE OUTLET LOAD-  G/cU«>
     502 INLET CONCENTRATION -  PPM
     S02 OUTLET CONTRATION  - PPK
     S02 DFSI&N REMOVAL EFFICIENCY  -  X
 COLD  SIDE
 C-E WALTHER
   99.5
   16?.3
                (  335 F)
 TH*OUAUAY  PRODUCT
 UET  SCRUBBING
 LIMESTONE
 CHEMICO
 FULL-SCALE
 NEU
   99.50
   74.00
 10/7F
  5/7«
 SPRAY  TOUERS
  5/7?
 CHEMIcO
     4
    33.0
   42?.01
    60.6
  4000.
                 ( 907000 ACFM)
                 <  141  F)
                 <6349C  GPK)
                 C 70.0  GAI/1000ACF)
                 ( J.O  IN-H20)
                 (  .050 GR/SCF)
                 (  .050 GR/SCF)
   496
    74.0
                                                335

-------
EPA UTILITY  HiD  SUFVEY: OECE^EtER  197T  - JANUARY 1979
                                             SECTION  3
                     DESUN  AND  PERFOOFAKCE DATA FOR OPERATIONAL F60 SVSTFMS
 *«  FANS
      NUMfER
      TYPF
                                                   3
                                                 BOILER  I.D.
  *»  HIST  EL 1MINATOR
      NUMPER
      TYPf
      CONFIGURAT10N
      NUMPER  OF STAGES
                                                  CHFVRON
                                                  HORIZONTAL
                                                      1
  «*  PUMPS
      SERVICE
      RECYCLE
      LIHFSTONl SLURRY P II« P
                                                  NUMBF. R

                                                     3
                                                  ****
  **  TANKS
      SERVICE
      LIMESTONE SLURRY
      RECYCLE
                                                  NUMBER

                                                  ****
                                                  * ***
  **  REHEATED
      TYpF
      HEATING NEplUI*

  **  VATER LOOP
      TYpC
      FRESH MAKEUF WATER  ADDITION -

  *«  TREATMENT
      TYpE

  **  DISPOSAL
      NATURE
      TYPE
      LOCATION
                                                  INDIRECT HOT AIR
                                                  STEAt"
                                                  CLOSED
                                                     3*.*
                                                  FLYASH STABILIZED
                                                  FINAL
                                                  LANDFILL
                                                  ON-SITE
PERIOD
                                             PERFORKANCf DATA ------------------------------------------
                AVAHABH IT» OTERAPILITY  PLIABILITY  UTILIZATION  x  REMOVAL   PER  BOILER   F6D   CAP.
                                                                   S02   PART. HOURS HOURS   HOURS FACTOR
  4/78  SYSTEM
        ** PROELEMS/SOLUTIOMS/COKMENTS
               START  DATE   4/78     £GUl!f«ENT:  F6D SYSTEM, GEMERAL
               £No  DATE      5/78     COKMfNTS:
                            T^E TEXAS AIR  CONTROL BQARP REPORTED  THAT THE TEXAS UTILITIES  750 MK
                            HCNTICELLO UMT  3 BE6AN F6D OPERATIONS  DURING THE REPQRT  PERIOD.  AS OF
                            YfcT THE UNIT  H*S NOT RUN AT FULL  LOAD BUT IS EXPECTED TO  BY  THE  E NO Op
                            AUGUST.
               AFFECTED  MODULES: SYSTir
 5/7?   SYSTEM

 «/7£   SYSTEM
                                                                                  744

                                                                                  720
               tNc CATf     7/76
                            TtiE UNIT  IS  NU  AT FULL LOAD YE T •   ONE OF THE THREE  F6D  MODULES IS FULLY
                            OPERATIONAL.   ANOTHER ONE IS PARTIALLY OPERATION A(. t  WHILE  THi THIRD IS NOT
                            OFERAT1N6  AT  flL AS YET.
               AFFECTED MODULES:  SYSTEM
        ** F-RCBLEI"S/SOLUTIONS/COMMENTS
               START  DATE   6/7£      EBUIffENT:  FGD SYSTEM,  CENERAL
  7/78

  6/78  SYSTEM
                                                                                 744

                                                                                 744
            PROfeLEnS/SOLUTION5/COMMENTS
               START DATE   */78      EOUjff'ENT: F6D SYsTEH,  6ENERAL
               END DATE     9/78      COHN hNTS:
                                                  336

-------
                                              EPA  UTILITY FGD SURVEY: DECEMBER  1978  -  JANUARY  1979
                                            SECTION  3
                    DESIGN  AND  PERFORMAKE DATA  FOR OPERATIONAL F6D SYSTEMS
............ ------------------ ...... — . — PERFORMANCE;  BAT A ------ - — -- ---- ......... — . -------------
PERIOD MODULE AVAILABILITY  CPERAP1LITY  ^LIABILITY UTILIZATION  X REMOVAL    PEP   BOILER   FED    CAP.
                                                                  S02  PART.  HOURS  HOURS   HOURS  FACTOR
                           THE COMPLIANCE  TEST  HAS  NOT  YET TAKEN PLACE.  THE  FGD SYSTEM  IS  OPERATION-
                           AL.  INSTRUMEfTATION  INDICATES THAT THE UNIT  IS IM COMPLIANCE.
             AFFECTED  MODULES: SYSTEI"
 9/78

10/78
 11/7*

 12/7P
SYSTEM

SYSTEM
                                                                                720

                                                                                744
** PR06LENS/SOLUT10NS/COMMENTS
      START  DATE   10/78     E6U1F«ENT:  INSTRUMENTATION
      END DATE     11/78     PROBLEM: NOT  DEFINED/SPECIFIED
                    CONTINUOUS N0«,0e»  AND S02  MONITORS ARE A PROBLEM AREA.
      AFFECTED  MODULES: SYSTEM

•* PR06LEMS/SOLUTIONS/CCMMENTS
      START  DATE   10/76     E6U1!;NENT:  SLUDGE  DISPOSAL
      END DATE     11/7S     CCMMtNTS:
                    TfcE SLUDEE IS  CURRENTLY NOT FIXATED.
                    PCND.
      AFFECTED  MODULES: SYSTEM
 SYSTEM

 SYSTEM
                                                                   IT  IS  BEIN6 PUMPED DIRECTLY TO THE



                                                                                720

                                                                                7*4
        •* PROHLEMS/SOLUT10NS/COMMENTS
              START DATE   12/78      EGL'IfMENT: FGD SYSTEM.  GENERAL
              END DATE     1?/?8      CCHMINTS:
                            TH  F6D SYSTEM IS FULLY OPFRATIONAL.   A  PRELIMINARY TEST WAS PERFORMED ON
                            DtCEME'ER 1*.  RESULTS OF THE  T6ST  ARE  NOT YET AVAILABLE.
              AFFECTED MODULES:  SYSTEM

        ** PROBLEWS/SOLUT10NS/COMMENTS
              START DATE   1Z/78      E6UIt!*ENT: FGD SYSTEM,  GENiERftL
              END DATE      1/79      COKM I^TS:
                            Tft  F€D SYSTEM REPORTEDLY  HAS BEEN PERFORMING WELL.
              AFFECTED MODULES;  SYSTtP

        ** PROBLEMS/SOLUTI OK S/C CMCEN T S
              START DATE   1Z/78      ESUHF.ENT: ESP
              LND DATE      1/79      f-POPL'M: MATERIALS  F AI LURF ,OTH ER
                            fl-t  ESP IS KOI OPERATING  WELL.  COLLECTION EFFICIENCY IS NOT AS HIGH AS  IT
                            ShOULO BE.  AFNON1A INJECTION HAS  BEEN TRIED TO IMPROVE ITS EFFICIENCY.
                            REPORTEDLf  T H I. PROBLEM  IS  THE RESULT  OF  STRUCTURAL DAMAGE.
              AFFF.CTED MODULES:  SYSTEM
   1/79  SYSTEM
                                                                                744
                                                  357

-------
FPA UTILITY  F6D SURVEY? DECtMBFF,  197£  - JANUARY 1979
                                             SECTION  3
                     DESIGN  AND  PT R F OPf A hC E DATA  F0» OPERATIONAL FGo
 COMPANY  NAKi
 PLANT  NAHF
 UNIT NUMBER
 CITY
 STATE
 REGULATORY CLASSIFICATION
 PARTICULATE EMISSION LIMITATION - 0.6/J
 S02  EMISSION  LIMITATION  -  NG/J
 NET  PLANT GENERATING CAPACITY - *v
 GROSS  UNIT GENERATING  CAPACITY - pV
 NET  UNIT GENERATIK'6 CAPACITY W/FGD - f
 NET  UNIT GENERATING CAPACITY WC/FGt, -
 ESUIVALfNT SCRUBBED CAPACITY - fW
UTAH POWER  K  LI&HT
HUNTINGTON
1
PRICF
UTAH
A
******
******
  B10.0
  430.0
  40H.O
(****** LP/MM8TU)
  566.0
  •* BOILER DATA
      SUpPLI ER
      TYPE
      SERVICE  LOAD
      COMMERCIAL  SERVICE  DATfc
      MAXIMUM  BOILER  FLUE GAS FLOW - tli.i/S
      FLUE GAS TEMPERATURE - C
      STACK HEIGHT  -  I*
      STACK TOP  DIAMETER  - l»

  «« FUEL DATA
      FUEL TYPE
      FUEL GRADE
      AVERAGE  HEAT  CONTENT - KJ/KC
      RANGE HfAT  CONTENT  - PTU/LE
      AVERAGE  ASH CONTENT - »
      RANGE ASH  CONTENT - X
      AVERAGE  MOISTURE  CONTEia - X
      RANGE HCISTURF  CONTFNT - T
      AVERAGE  SULFUR  CONTENT - *
      RANC-E SULFUR  CONTENT - t
      AVERAGE  CHLORIDF  CONTENT - X
      RANGE CHLORIDE  CONTENT - 3!
      FUEL FIRING RATE  - M T/H
      FUEL FIRING RATE  - KW
COMBUSTION  ENGINEERING
PULVERIZED  COAL, TANGENTIAUY  FIRED
BASE
 0/7P
  82?.05        <17«COD ACFM>
  130.0         < 266 F)
  1ST.          ( 600 FT)
*******         (***** FT)
COAL
******
    10.00
******
      .50
******
********
******
   151.5
   430
                (****** BTU/LR)
                 4 **** *
(167 TPH)
  ** ESP
      TYPE
      SUPPLIER

  ** FG&  SYSTEM
      SALEABLE  PRO DUCT/THROW AWAY  PRODUCT
      GENERAL PROCESS TYPE
      PROCESS TYPt
      SYSTEM  SUPPLIER
      A-E FIRM
      DEVELOPMENT LEVEL
      NEW/RETROFIT
      PARTICULATE DESIGN REMCVAL  FFFK1ECCY
      $02 DESIGN REMOVAL EFFICIENCY  -  X
      INITIAL START-UP

  ** A6SOP8FR
      NUMPER
      TYPt
      INITIAL START UP
      SUPPLIER
      SHELL  MATERIAL
      SHELL  LINER MATERIAL
      6AS TEMPERATURE - C
      L/fi R«T10 - L/CU.M

  »* FANS
      NUMBER
      TYPF

  *« FANS
      NUMPER
      TYPE
COLD  SIDE
BUELL/ENVIRcTECh
THROWAWAY  PRODUCT
WET  SCRUBBING
LIME
CHEH1CO
STEARNS &  ROGERS
FULL-SCALE
NE.V
    9
-------
                                              EPA  UTILITY FG6 SURVEY: DECEMBER  1978  -  JANUARY  1979
                                            SECTION  3
                    DESIGN AND PERFORMMCE  DATA  fOR OPERATIONAL F60 SYSTEMS
** VACUUM FILTER
    NUMBER
    OUTLET SOLIDS  -  X

*« MIST ELIMINATOR
    CONSTRUCTION  l"ATERlAL
    CONFIGURATION
    MUMPER OF  PASSES
    FREEBOARD  DISTANCE - M

«* PUMPS
    SERVICE
    RECYCLE

 ** TANKS
    SERVICE
     RECYCLE

 **  REHEATER
     TYpE
     HEAT1N6  MEDIUM
     TEMPERATURE BOOST - C

 «*  REHEATER
     TYpE
     TEHPE«ATUR£ BOOST - C

 **  THICKENER
     TYPf
     CONSTRUCTION MATERIAL
     DIAMETER - M
     OUTLET SOLIDS - X

 ** HATER  LOOP
     TYPF
     FRESH MAKEUP WATER ADDITION  -  LI1ERS/S

 ** TREATMENT
     TYPE

 ** DISPOSAL
     NATURE
     TYPE
     LOCATION
     TRANSPORTATION
   60.0
POLYPROPYLENE
HORIZONTAL
    I
    3.66
NUMBER

   4


NUMBER

   4
IN-LINE
STf AM
   26.7
BYPASS
   2«.7
                (12.0  FT)
                (    4?  F)
                    48  F>
CYLINDRICAL  WITH DORR  OLIVER RAKF
CARBON  STEEL WltH FLAKE6LASS LINING
    1*.3         < 60 FT)
    27-5
CLOSED
    1P.9
NONPROPRlETARY
FINAL
LANDFILL
ON  SITE
TRUCK
                (  300 GPM)
                       STABILIZED
                                           PER fORMAMCE  DATA	•	•	-
       MODULE AVAILABILITY  OPFRABILlTr PLIABILITY UTILIZATION   X  REMOVAL    PER  BOILER  FGD   CAP.
                                                                  S02  PART. HOURS HOURS  HOURS FACTOR
 5/7P  SrSTE*
       ** PROfcLEMS/SOLUTIONS/COMNtNTS
             START DATE    5/78      EOUIfENT: FGD SYSTE«t  GEN£RAL
             END DATE      5/78      CCMMINTS:
                           IMT1AL  OfERAIIONS BEGAN ON  MAY  1C»
             AFFECTED MODULES:  SYSTEM
 6/7E  SYSTEM
                                                                               720   720
       ** PROELEKS/SOLUTIONS/COM^ENTS
             START DATE    6/7£      E GUI F*1' ENT: F6D SYSTEM.
             END DATE      7/78      CCMMINTS:
                           THE  UTILITY RtPORTCD THAT  1Q-ZO* OF  THE FLUE GAS WAS BYPASSED.
             AFFECTED MODULES:  SYSTEM
 7/78  SYSTE»
                                                                               744   731
                                                339

-------
EPA UTILITY FbP SURVEY: DECt*BER  197£  -  JANUARY 1979
                                            SECTION 3
                    DESIGN  AND  PERFORMANCE  DATA FOR OPERATIONAL F6D SVSTFHS
	-----PERFORMANCE DATA----	...... ._.--.-..........
PERIOD MODULE AVAILABILITY  CPERABIL1TY  tELIABUITY UTILIZATION  X REMOVAL   PER   BOILER  F60   CAP.
                                                                 S02  PART.  HOURS  HOURS  HOURS FACTOR


 6/76  SYSTEK                                                                  744    544

       «• PROBLEMS/SOLUT10NS/COMMENTS
              START  DATE    8/78      EOU1IMENT:  BOILER-RELATED
              END  DATE      9/76      COKMfK'TS:
                           AK  EXPLOSION  (AUSED  A THREE WEEK BOILER OUTAGE.
              AFFECTED  MODULES;  SYSTEM

       ** PROaLEKS/SOLUTIOMS/COKMENTS
              START  DATE    «/78      EOUIFKENT:  FGD SYSTEM, GENERAL
              END  DATE      9/76      COMMITS:
                           Tf-E  UTILITY  RtPORTEB THUT THERE' WfRj NO FORCED F15D -QUTA6ES.
              AFFECTED  MODULES:  SYSTEM
  9/7R   sTSTEM                                                                  720    496

10/78   SYSTEM                  100.0                   100.C                   744    744    7440

11/78   SYSTEM                   62.4                    6Z.4                   7?0    7?0    449Q

        **  PROBLEMS/SOLUTIONS/COMMENTS
              START  DATE   11/78      EOUlfWENT: THICKENER
              END  DATF     12/78      ^fOBlfM: NOT DEFINED/SPECIFIED
                           Tfcf  THICKENER HAD SOLIDS BUILDUP THE LAST OF NOVEMBER AND  THE  FIRST  PART
                           OF DECEMPl*  FCRCING SYSTEM SHUTDOWN TO ALLOU MANUAL REMOVAL OF  THE  SOLIDS.
              AFFECTED  MODULES:  SYSTEM

12/76   SYSTEM                   14.0                    32.7                   744    715    2430

        *«  PROBLEMS/SoLUtlONS/COMMENTS
              START  DATE   1?/78      |QUi H^ENT: F6D SY^TEHt GENERAL
              END  DATF      1/79      fPOSlfM: WfATHER-RELATED COMPONENT FAILURE
                           MEE?r-UP PNO'JtEMS CAUSED OUTAGES OF A FEU WEEKS DURATION.
              AFFECTED  MODULES:  SYSTEM

  1/79    489                     76.?                    65.7
        SYSTEM                                                                  7*4    642
                                                S40

-------
                                        EPA UTILITY F6D SURVEY:  DECEMBER  1978  - JANUARY 1979
                                        SECTION 4
                            SUMMARY Of FGD SYSTEMS BY COMPANY

TOTM.
COMPANY NAME
ALABAMA ELECTRIC COOP
ALLEGHENY POWER SYSTEM
ARIZONA ELECTRIC POWER CCOP
ARIZONA PUBLIC SERVICE
ASSOCIATED ELECTRIC COOP
PASIN ELECTRIC POWER COOP
BIG RIVERS ELECTRIC
CENTRAL ILLINOIS LIGHT
CENTRAL ILLINOIS PUBLIC SFRV
CENTRAL MAINE POWER
CINCINNATI GAS It ELECTRIC
COLORADO UTE ELECTRIC ASSN.
COLUMBUS t SOUTHERN OHIO fLEC.
COMMONWEALTH EDISON
COOPERATIVE POWER ASSOCIATION
DELFURVA POWER R LIGHT
DUBUESNE LIGHT
EAST KENTUCKY POWER CCOP
GENERAL PUBLIC UTILITIES
6ULF POWER
HOOSIER ENERGY
HOUSTON LIGHTING * POWER CO.
INDIANAPOLIS POWER 8 LIGHT
KANSAS CITY POWER K LIGHT
KANSAS POWER ft LIGHT
KENTUCKY UTILITIES
LAKELAND UTILITIES
LOUISVILLE GAS 1 ELECTRIC
MIDDLE SOUTH UTILITIES
MINNESOTA POWER & LIGHT
MINNKOTA POWER COOPERATIVE
MONTANA POWER
NEVADA POWER
NIAGARA MOHAWK POWER COOP
NORTHERN INDIANA PUR SERVICE
NORTHERN STATES POWER
OTTER TAIL POWER
PACIFIC GAS 1 ELECTRIC
PACIFIC POWER £ LIGHT
PENNSYLVANIA POWER
PHILADELPHIA ELECTRIC
POTOMAC EUCTRIC POWER
POWER AUTHORITY OF NEW YCRK
PUBLIC SERVICE OF INDIANA
PUbLIC SERVICE OF MEW MEXICO
SALT RIVER PROJECT
SAN MIGUEL ELECTRIC COOP
SEMINOLE ELECTRIC
SIKESTON BOARD OF HUNK. UTIL.
SOUTH CAROLINA PUfUIC SERVICE
SOUTHERN CALIFORNIA EDISCN
SOUTHERN ILLINOIS POWER COOP
SOUTHERN INDIANA GAS R ELEC
SOUTHERN MISSISSIPPI ELECTRIC
SOUTHWESTERN ELECTRIC POWER
SPRINGFIELD CITY UTILITIES
SPRINGFIELD WATER, LIGHT Si PV.K
ST. JOE ZINC
TAMPA ELECTRIC
TENNESSEE VALLEY AUTHORITY
TEXAS MUNICIPAL POWER AGENCY
TEXAS POWER ( LIGHT
TEXAS UTILITIES
UTAH POWER t LIGHT
WISCONSIN POWEK £ LIGHT
NC.
2
3
?
f
1
5
2
1
1
1
1
2
4
1
2
1
2
1
2
1
2
1
2
3
4
1
1
10
t
1
1
4
1C
1
3
5
1
2
1
3
4
1
1
1
4
3
1
1
1
?
1
1
1
7
1
1
1
1
1
*
1
3
C
3
1
*K
358.
1338.
760.
J&84.
670.
£680.
484.
* 32 .
617.
600.
'50.
900.
1572.
425*
*54.
180.
020.
r>00.
1*00.
23.
P82.
'12.
1062.
1094.
1575.
64.
364.
:508.
1340.
475.
<05.
4120.
3125.
100.
705.
tl 60.
440.
1600.
•=50.
i1 "* 5 1 .
t 44.
r'00.
7QO.
C50.
1779.
f 40.
400.
£20.
235.
440.
175.
484.
265.
748.
720.
194.
205.
60.
450.
;753.
400.
1*82.
',585.
1086.
716.
OPERATIONAL
NO.
1
0
1
2
0
0
0
1
0
0
0
0
2
0
0
0
2
0
0
1
0
0
1
3
3
1
0
4
0
0
1
2
3
0
1
2
0
0
0
2
1
0
0
0
2
0
0
0
0
1
0
0
0
1
0
1
0
0
0
3
0
0
3
1
0
MW
179.
0.
180.
469.
0.
0.
0.
416.
0.
0.
0.
0.
H22.
0.
0.
0.
920.
0.
0.
23.
0.
0.
532.
1094.
1085.
64.
0.
885.
0.
0.
405.
720.
375.
0.
115.
144C.
0.
0.
0.
1834.
120.
0.
0«
0.
711.
0.
0.
0.
c.
140.
0.
0.
0.
124.
C.
194.
0.
0.
0.
570.
0.
0.
1990.
366.
0.
CONSTRUCTION CONTRACT
AWARDED
NO.
1
2
1
4
0
2
2
0
1
0
1
2
0
1
2
1
0
0
0
0
2
0
1
0
1
0
0
3
0
1
0
0
0
0
0
0
1
0
1
1
0
0
0
0
0
2
1
0
1
0
0
1
1
1
0
0
1
1
0
1
0
1
1
2
0
MW
179.
1036.
180.
705.
0.
1200.
484.
0.
617.
0.
650.
900.
0.
425.
654.
180.
0.
0.
0.
0,
£82.
0.
530.
0.
490.
P.
0.
1123.
C.
475.
0.
0.
0.
0.
p.
0.
440.
0.
550.
917.
0.
0.
0.
0.
0.
560.
400.
0.
235.
0.
C.
164.
265.
124.
n.
0.
205.
60 .
Or
575.
0.
582.
595.
720 .
0.
NO'
0
0
0
2
1
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
1
1
0
0
0
2
0
1
0
0
0
0
0
0
0
c
0
0
2
0
0
0
0
1
1
0
0
0
1
0


0
2

1

1
MW
0.
0.
0.
1510.
670.
1040.
0.
0.
0*
0.
0*
0.
0.
"0.
0.
0.
0-
50Q.
0.
0.
o.

o!
0.
0.
0.
364.
350.
0.
0.
0.
1400.
0«
100.
0.
c.
0.
0*
0.
0-
0.
c.
0.
0.
1068.
0.
0.
0.
0.
300.
175.
0.
0.
0.
«K fk
720.
0.
.
0-
0"
1406.

.
75 Q»
.
» 4 j»
31 0.
PLANNED
NO.
0
1
0
o
o
1
o

0
1
0
0
2
0
0
0
0
0
2
0
0
1
0
0
0
0
0
2
6
0
0
0
7
0
2
1
0
2
0
0
3
1
1
1
0
1
0
1
0
0

1

0

0
0

I
0
3


MW
0.
300.
0.
0.
C.
440.
0.
4U.
0.
600.
0.
p.
7bC«
e-
0.
r.
n.
0.
1600.
P.
0.
512.
0.
0.
n.
0.
P.
115C.
5340.
0.
0.
C.
2750.
0.
5VC*.
72p.
0.
1600.
P.
P.
724.
^ t\f\
rOC.
6SC»
P«
28 p.
r.
62P«
P.
P.
"•
300.
"*
0»

•
*
•
1200.
0.
•
22SO*.
0*

<
TOTALS
                                  7
-------
EPA UTILITY F6D SURVEY: DECtPbEft 197f  - JANUARY 1979
                                            SECTION *
                             SUKfiARY Of FGD SYSTEMS P Y SYSTEM SUPPLIER

TOTAL
SYST[M SUPPLIER/PROCFSS
ADL/COM6USTION EOU1P ASSOCIATE
DUAL ALKALI
LI IF
LIKE/ALKALINE fLYA$H
SODIUM CARBONATE
TOTAL -
AIR CORRECTION DIVISION, UOP
LIME
LIMESTONE
LIME/LIMESTONE
SODIUM CARBONATE
TOTAL -
AMERICAN AIR FILTER
LIME
TOTAL -
EABCOU g WILCOX
LIME
LIME {DRY COLLECTION)
LIMESTONE
TOTAL -
PUELL/ENVIROTECH
DUAL ALKALI
TOTAL -
BUREAU Of MINES
CITRATE
TOTAL -
CHEMICO
LIME
LIMt STONE
LIME/ALKALINE FLYASH
LII»C /LIMESTONE
TOTAL -
CHIYODA INTERNATIONAL
LIMESTONE (CHIYOOA 121)
TOTAL -
COMBUSTION ENGINEERING
LIME
LIMESTONE
LIMESTONE/ALKALINE FLYASH
LIME/LIMESTONE
TOTAL -
DAVY POVERGAS
HELLMAN LORD
TOTAL -
FMC CORPORATION
DUAL ALKALI
TOTAL -
JOY MF6. CO, HESTER* PRECIPITA
LIME (DRY COLLECTION)
TOTAL -
NO.

1
3
3
3
10

2
4
1
1
8

6
6

3
1
7
11

1
1

1
1

7
1
4
1
13

1
1

6
7
2
2
17

6
6

1
1
1
1
MW

278.
1220.
1805.
375.
3678.

822.
1871.
10.
550.
3253.

1658.
1658.

1686.
600.
2*97.
4765.

617.
617.

60.
60.

3840.
800.
895.
10.
5545.

23.
23.

1144.
2932.
1440.
700.
6216.

2074.
2074.

265.
265.
440.
440.
OPERATIONAL
NO.

0
2
1
3
6

2
2
1
0
5

3
7

0
0
2
2

0
0

0
0

5
1
0
1
7

1
1

4
3
2
0
9

3
3

0
0
0
0
MW

0.
720.
405.
375.
1500.

522.
726.
10.
0.
1558.

679.
679.

0.
0.
1014.
1014.

o.
0.

0.
0.

3120.
800.
0.
10.
3930.

23.
23.

490.
1085.
1440.
0.
3015.

S26.
P26.

0.
0.
o.
0.
CONSTRUCTION
MO.

1
0
0
0
1

0
1
0
1
2

3
3

3
0
3
6

1
1

1
1

2
0
3
0
5

0
0

2
3
0
1
6

1
1

1
1
0
0
BW

278.
0.
0.
0.
E76.

0.
425.
0.
550.
975.

979.
979.

1688.
0.
819.
?507.

617-
617.

60.
60.

720.
0'
579.
0.
1299.

0.
0.

654.
1447.
0.
350.
2451.

160.
180.

265.
265.
0.
0.
CONTRACT
AWARDED
NO.

0
1
2
0
3

0
1
c
0
1

0
0

0
1
2
3

0
0

0
0

0
0
1
0
1

0
0

0
1
0
1
2

2
2

0
0
1
1
MW

0.
500.
1400.
0.
1?00«

0.
720.
0.
0.
72o.

0.
0.

0.
600.
664.
1264.

0.
0.

0.
0.

0.
0.
316.
0.
316.

0.
0.

0«
400.
0.
350.
750.

106P.
1068.

0.
o.
440.
440.
                                                342

-------
                                     EPA UTILITY  FGt SURVEYi DECEMBER 1978 - JANUARY 1979
                                    SECTION  5
                     SUMMARY Of F6D SYSTEHS  PY  SYSTEM SUPPLIER

TOTAL
SYSTFM SUPPLIER/PROCESS
MITSUBISHI INTERNATIONAL
LIKESTONE
TOTAL -
PEABOOY PROCESS SYSTEMS
LIMESTONE
LIKE/ALKALINE FLYASH
TOTAL -
PULLMAN KELL06G
LIKE
LIMESTONE
TOTAL -
RESEARCH COTTRELL
LIMESTONE
TOTAL -
RILEY STOKER/ENVIROIiEERING
LIMESTONE
TOTAL -
ROCKWELL INTERNATIONAL
AQUEOUS CARBONATE
TOTAL -
SO. CAL1FRON1A ED I S CN/ STEA RNS
LIME
TOTAL -
TENNESSEE VALLEY AUTHORITY
LIMESTONE
TOTAL -
UNITED ENGINEERS
LIME
MAGNESIUM OXIDE
TOTAL -
VENDOR NOT SELECTED
LIMESTONE
TOTAL -
WHE ILABRATOR-fRYE/R .1.
AQUEOUS CARBONATE IDRY COLLECT
TOTAL -
NO.

2
Z

4
1
5

1
3
4

13
13

3
3

1
1

1
1

1
1

Z
1
3

Z
2

1
1
nw

882.
863.

1258.
475.
1733.

917.
1230.
2U7.

5425.
5425.

664.
664.

100.
100.

175.
175.

550.
550.

1510.
120.
1630.

1408.
1408.

440.
440.
OPERATIONAL
NO.

0
0

1
0
1

0
0
0

5
5

2
2

0
0

0
0

1
1

0
1
1

n
0

0
0
KU

0.
0.

179.
0.
179.

0.
0.
0.

1P39.
1839.

540.
540.

0.
0.

0.
0.

550.
550.

0.
120.
120.

0.
0.

0.
0.
CONSTRUCTION
NO.

2
2

3
1
4

1
2
3

7
7

1
1

0
0

0
0

0
0

0
0
0

0
0

1
1
Mfc

882.
882.

1079.
475.
1554.

917.
56o.
1477-

2836.
?836.

124.
124.

0.
0.

0-
0.

0.
0.

0.
c.
0.

0.
0.

440.
440.
CONTRACT
AWARDED
NO.

0
0

0
0
0

0
1
1

1
1

0
0

1
1

1
1

0
0

2
0
2

2
?

0
0
MW

0.
0.

0«
0.
0.

0.
670.
670.

750.
750.

0.
0.

100.
too.

175.
175.

0.
0.

1510.
0.
1510.

140*.
1408-

0.
0.
TOTAL -
                                  112 43768.
                                                 46  15773.
                                                              45  1*924.
                                                                           21  11071.
                                        343

-------
EPA UTILITY FtiD SURVEY: DECIDER  197?  -  JANUARY 1979
                                             SECTION 6
                                  SUMMARY  Of F6D SYSTEMS BY PROCESS
                                     TOTAL
	STATUS	
OPERATIONAL  CONSTRUCTION    CONTRACT
                             AWARDED
                                                                                         PLANNED
PROCESS
AQUEOUS CAhBONATL
CITRATE
LIMESTONE/CH1YODA 121
MAGNESIUM OXIDE
BELLMAN LORD
SUbTOTAL - SALEABLE PRODUCT
AQUEOUS CARBOMATE/SPKA Y DRYING
DUAL ALKALI
LIKE
LI HESTONE
LI MESTONE/ALKALlNf FLYA5.H
LIHE/ALK ALINE FLYASH
LIME/LIMESTONE
LIME/SPRAY DRYING
PROCESS NOT SELECTED
SODIU"! CARbONATE
SUBTOTAL - THROWAyAY PKODUCT
TOTALS
SALEABLE. X DF TOTAL HW
NO.
1
1
1
e
f
14
1
?
51
56
2
F
R
2
3 2
t
14C
1 5P

*u
100.
60.
23.
1444.
2074.
3701.
440.
1170.
12941.
25734.
1480.
3175.
1328.
1040.
1S670.
925.
66503.
70204.
5
NO.
0
0
1
1
3
5
0
0
16
17
2
1
2
0
0
3
41
46

MU
0.
0.
23.
120.
826.
96*.
0.
0.
5798.
6746.
USD.
405.
20.
D.
0.
375.
14626.
15795.
6
NO.
0
1
0
0
1
2
1
3
11
£2
0
4
1
0
0
1
43
45

HW
0.
60.
0.
0.
no.
240.
44C.
1170.
4958.
8206.
0.
105.4.
358.
0.
0.
S5C.
16736.
16976.
1
NO.
1
0
0
0
2
3
0
0
4
E
0
3
1
2
0
0
16
21

m
100.
0.
0.
0.
1068.
11S8.
0.
0.
2185.
4592.
0.
1716.
350.
1040.
0.
0.
9683.
11051.
11
NO.
0
0
0
4
0
4
0
0
0
9
0
0
1
0
32
0
42
46

MM
C.
0.
c.
1324.
0.
1324.
0.
0.
0.
57SR.
0.
0.
60P.
0.
1 
-------
                       tPA UTILITY FGD SURVEY:  DECEMBER  1978  - JANUARY 1979
                      SfCT10N ?
SUWMAKY OF OPERATIONAL FGD SYSTEMS 61 PROCESS AND  UNIT
PROCESS/
UNIT NAC.F UNIT NO.
LIKE
ERUCf MANSFIELD 1
BRUCE MANSF 1ELP ?.
CANE RUN i
CANfc RUN 5
COLSTRIP 1
COLSTRIP ?
CONESVILLE r
CONESVILLE 6
ELRAMA 1-4
GfiFEN RIVER 1-3
HAWTHORN J
HAWTHORN 4
HUNTIN6TCN 1
HILL CREEK
PADDY'S RUN t
PHILLIPS 1-6

LIMESTONE
APACHE ?
CHOLLA 1
CHOLLA ?
DUCK CREEK 1
JEFFREY 1
LA CYGNE 1
LAWRENCE '•
LAWRENCE 5
MARTIN LAKE i
MAPTIN LAKE i
MONTICELLO 3
PETERSBURG *
R.D. MORROW 1
SOUTHWEST 1
TOMBI6EEE '-
WIDOWS CREEK fc
W1NYAH ?

LIMESTONE (CHIYODA 1?1>
SCHOLZ 1*2

LIMESTONE/ALKALINE FLYASH
SHEREURNE 1
EHFRPURNF i'

LIME/ALKALINE fLYASH
MILTON R. YOUNG I

LIME/LIMESTONE
C U AUhl f f 1 0 A
9f1^HnCC •»**•*
SHAWNtl 10B

MACNfSlUM OXIDE
EDDVSTONE 1A

CAPACITY
nw

917.
917.
190.
200.
360.
360.
411.
411.
510.
64.
110.
110.
366.
425.
70.
410.
5831 .

1BO.
119.
350.
416.
540.
874.
125.
420.
5«5.
595.
BOO.
532.
124.
194.
179.
550.
140.
6733.
23.
23.
720.
720.
144(1.
405.
405.
10.
10.
2C.
120.
12C.
INITIAL
STARTUP

12/75
7/77
8/76
12/77
9/75
5/76
1/77
6/7P
10/75
9/75
11/72
8/72
5/7R
sm
4/73
7/73


8/7S
10/73
4/7P
7/76
8/7R
2/73
1/76
11/71
4/77
5/78
5/76
12/77
8/78
4/77
9/78
5/77
7/77

8/78

3/76
4/77

9/77

4/7?
4/7?

9/75

COMMERCIAL
STARTUP

6/76
10/77
9/77
6/78
11/75
10/76
2/77
6/78
10/75
6/76
O/ 0
O/ 0
O/ 0
O/ o
O/ 0
•o/ o


11/78
12/73
O/ 0
fl/78
8/78
6/73
O/ 0
O/ 0
P/77
O/ 0
10/78
12/77
O/ 0
O/ o
O/ 0
1/78
O/ 0

O/ 0

3/76
4/77

6/78

O/ 0
O/ 0

9/75

                           345

-------
FPA UTILITY  F£0  SURVEY: rECEKBFF 197?  -  JANUARY 1979
                                              SECTION 7
                               OF OPERATIONAL F6D SYSTKKS oY  PROCESS AND UNIT
PROCESS/
UNIT NAME
SODILIF CARBONATE
KEID GARDKEB
REID EARDNEK
RE IB GARDNEK

WELL^AN LORD
DEAN H. MTCHELL
SAN JUAN
SAN JUAK
UNIT NO.
1
i

11
1
7
CAPACITY
nv
12s!
125.
375.
115.
361.
350.
INITIAL
STARTUP
4/74
6/76

7/76
4/7P
P./7B
CCKPERCI AL
STARTUP
O/ C
O/ 0
7/76

6/77
O/ 0
O/ 0
                                                         626.
               TOTAL
                                                       15773.
                                                 346

-------
                                             EPA  UTILITY F6D SURVEY: DECEMBER 1978 - JANUARY
                                            SECTION  8
             SU*HARY  OF  END-PRODUCT DISPOSAL  PRACTICES  FOR OPERATIONAL F6D SYSTEMS
DpncF ss y
rnUVCvQf
UNIT NAME
LINE
BRUCE MANSFIELD
BRUCE MANSFIELD
CANE RUN
CANE RUN
COLSTR1P
COLSTRIP
CONESVILLE
CONESVILLE
ELD AM A
GREEN RIVER
HAWTHORN
HAWTHORN
HUNTIN6TON
HILL CREEK
PADDY'S RUN
PHILLIPS

UNIT NO

1
2
4
5
1
2
5
6
1-4
1-3
3
4
1
3
6
1-6

STABILIZED UNSTABlLIZED TYpE DISPOSITION

LANDFILL
LANDFILL
LINED POND
LINED POND

POND
LANDFILL
DIKED LANDFIL
LANDFILL
LINED POND
UNLINED POND
UNLINED PC N(>
LANDFILL
SLUDGE POND
UNLINED POND
LANDFILL
LIMESTONE

APACHE
CHOLLA
C HOLLA
DUCK CREEK
JEFFREY
LA CYGNE
LAWRENCE
LAWRENCE
KARTIN LAKE
*ART!N LAKE
PIONTICELLO
PETERSBURG
R.D. MORROW
SOUTHWEST
TOMB1GBEE
WIDOWS CREEK
U1NYAH
2
1
2
1
1
1
4
5
1
2
3
3
1
1
2
8
2
 LIMESTONE  (CHIYODA 121)

 SCHOLZ                  1.2

 LIMESTONE/ALKALINE FLYASH
UNLIMED POND

UNLINED POND
UNLINED POND
LANDFILL
LANDFILL
LANDFILL
UNLINED POND
LANDFILL
LANDFILL
LINED POND
SLUD6E POND
UNLINED POND
SLUDGE POND
LINED POND

UNLINED POND
               POND
               UNLINED POND
                                     GYPSUM
                                                           STACKED IN  POND
 SHERBURNE
 SHERBURNE
         LINED POND
         LINED POND
 HILTON R. YOUNG

 LIME/LIMESTONE

 SHAkNEE
 SHAWNEE
           OXIDE

 EDDYSTONE

 SODIUM CARBONATE

 PEID GARDNER
 REID GARDNER
 PETD GARDNER
 1C A
 10 B
 1A
                                               HINEFILL
                                      SULFURIC ACID
                        EVAP  PONO
                        EVAP  POND
                        EVAP  POND
                                                  347

-------
FPA UTILITY F60 SURVEY: DECEH6ER 1978 - JANUARY 1979

                                            SECTION 8
              SUMMARY Of END-PRODUCT DISPOSAL PRACTICES  FOR OPERATIONAL  FGD SYSTEMS
PROCESS/
UNIT NAME
        —.	—THROWAWAY	
UNIT NO  STAbHl7FD   UfcSTABIL 12 EO
                                                    -BYPROOUCT-
                                                                    TYPI
                                                                                     DISPOSITION
        LORD

BEAN H. miTCMELL       11
SAN JUAN               1
$AN JUAN               2
                      ASH POND
                      ASH POND
ELEMENTAL SULFUR
ELEMENTAL SULFUR
ELEMENTAL SULFUR
MARKETED
MARKETED
                                               348

-------
             EPA UTILITY fGO SURVEY: DECEMBER  1978  - JANUARY 1979
            SECTION 9
SUMMARY OF F60 SYSTEMS IN OPERATION
Co«l»*N» NAME/
UNIT N»NE UNIT NO.
ALABAMA ELECTRIC COOP
TOMBI6BEE 2
ARIZONA ELECTRIC POWER COOP
APACHE 2
ARIZONA PUBLIC SERVICE
C HOLLA 1
ARIZONA PUBLIC SERVICE
C HOLLA 2
CENTRAL ILLINOIS LIGHT
DUCK CREEK 1
COLUMBUS 8 SOUTHERN OHIO ELEC.
CONESVILLE 5
COLUMBUS * SOUTHERN OHIO ELEC.
CONESVILLE 6
DUaUESNE LIGHT
ELRAMA 1-4
oUQUeSNE LIGHT
PHILLIPS 1-6
GULF POWER
SCHOLZ 1,2
INDIANAPOLIS POWER * LI 6HT
PETERSBURG 3
KANSAS CITY POWER s LIGHT
HAWTHORN 3
KANSAS ClfV POWER I LIGHT
HAWTHORN 4
KANSAS CITY POWER t LI6HT
LA CVGNE 1
KANSAS POWER t LIGHT
JEFFREY 1
KANSAS POWER & LIGHT
LAWRENCE 4
KANSAS POWER E LIGHT
LAWRENCE 5
KENTUCKY UTILITIES
GREEN RIVER 1-3
LOUISVILLE GAS t ELECTRIC
CANE RUN 4
LOUISVILLE GAS 8 ELECTRIC
CANE RUN 5
LOUISVILLE GAS & ELECTRIC
MILL CREEK 3
LOUISVILLE GAS * ELECTRIC
PADDY'S RUN 6
MINNKOTA POWER COOPERATIVE
MILTON R. YOUNG ^
MONTANA POWER
COLSTRIP 1
NEW OR C
RETROFIT
NEW
NEW
RETROFIT
NEW
NEW
NEW
NEW
RETROFIT
RETROFIT
RETROFIT
NEW
RETROFIT
RETROFIT
NEW
NEW
RETROFIT
RETROFIT
RETROFIT
RETROFIT
RETROFIT
NEW
RETROFIT
NEW
NEW
:APACITY
MW
179.0
180.0
119.0
350.0
416.0
411.0
411.0
510.0
410.0
2!.Q
532.0
110.0
110.0
874. 0
540.0
125.0
420.0
64.0
190.0
200.0
425.0
70.0
405.0
360.0
PROCESS/ J
SYSTEM SUPPLIER
LIMESTONE
PEABODV PROCESS SYSTEMS
LIMESTONE
RESEARCH COTTRELL
LIMESTONE
RESEARCH COTTRELL
LIMESTONE
RESEARCH COTTRELL
LIMESTONE
RILEY STOKER/ENVIRONEER1NG
LIME
AIR CORRECTION DIVISION, UOP
LIME
AIR CORRECTION DIVISION, UOP
LIME
CHEMIC0
LIME
CHEM1CO
LIMESTONE (CHIYODA 1?1)
CHIYODA INTERNATIONAL
LIMESTONE
AIR CORRECTION DIVISION, UOP
LIME
COMBU$TION ENGINEERING
LIME
COMBUSTION ENGINEERING
LIMESTONE
BABCOCK & WILCOX
LIMESTONE
COMBUSTION ENGINEERING
LIMESTONE
COMBUSTION ENGINEERING
LIMESTONE
COMBUSTION ENGINEERING
LIME
AMERICAN AIR FILTER
LIME
AMERICAN AIR FILTER
LIME
COMBUSTION ENGINEERING
LIME
AMERICAN AIR FILTER
LIME
COMBUSTION ENGINEERING
LIME/ALKALINE FLYASH
AOL/COMBUSTION EQUIP ASSOCIATE
LIME
AOL/COMBUSTION EOUIP ASSOCIATE
iTART-UP
DATE
9/78
8/78
10/73
4/7E
7/76
1/77
6/78
10/75
7/73
8/78
12/77
11/72
6/72
2/73
8/78
1/76
11/71
9/75
8/76
12/77
8/78
4/73
9/77
9/75
                 349

-------
FPA UTILITY F6D SURREY! DECEMBER 197? - JANUARY 1979
                                            SECTION 9
                                SUMMARY OF F6D SYSTEMS IN OPERATION
COMPANY NAME/
UNIT N»*E UNIT NO*
MONTANA POWER
COLSTRlp 2
NEVADA POWER
REID GA'RDNER 1
NEVADA POWER
REIP GARDNER 2
NEVADA POWER
REID GARDNER 3
NORTHERN INDIANA Pub SERVICE
DEAN H. MITCHELL 11
NORTHERN STATES POWER
SHERBUftNE 1
NORTHERN STATES POWER
SHERBURNS 2
PENNSYLVANIA POWER
BRUCE MANSFIELD 1
PENNSYLVANIA POWER
BRUCE MANSFIELD 2
PHILADELPHIA ELECTRIC
EDDYSTONE 1A
PUBLIC SERVICE OF NEW MEXICO
SAN JUAN 1
PUBLIC SERVICE OF NEW MEXICO
SAN JUAN 2
SOUTH CAROLINA PUBLIC SERVICE
WINYAH 2
SOUTHERN MISSISSIPPI ELECTRIC
R.D. MORROW 1
SPRINGFIELD CITY UTILITIES
SOUTHWEST 1
TENNESSEE VALLEY AUTHORITY
SHAWNEE 10A
TENNESSEE VALLEY AUTHORITY
SHAMNEE 10B
TENNESSEE VALLEY AUTHORITY
WIDOWS CREEK s
TEXAS UTILITIES
MARTIN LAKE 1
TEXAS UTILITIES
MARTIN LAKE 2
TEXAS UTILITIES
HONTlCELLO 3
UTAH POWER g LIGHT
HUNTINGTON 1
NEW OR
RETROFIT
NEW
RETROFIT
RETROFIT
NEW
RETROFIT
NEW
NEW
NEW
NEW
RETROFIT
RETROFIT
RETROFIT
NEW
NEW
NEW
RETROFIT
RETROFIT
RETROFIT
NEW
NEW
NEW
NEW
CAPACITY
MW
360.0
125.0
125.0
125.0
115.0
720,0
720. 0
917.0
917.0
120.0
361.0
350.0
uo.o
124.0
194.0
10.0
10.0
550.0
595.0
595.0
800.0
366.0
PROCESS/
SYSTEM SUPPLIER
LIME
AOL/COMBUSTION EQUIP ASSOCIATE
SODIUM CARBONATE
ADt/COMBUSTION EQUIP ASSOCIATE
SODIUM CARBONATE
ADL/COMBUSTION' gflUIP ASSOCIATE
SODIUM CARBONATE
ADI/COMBUSTION EQUIP ASSOCIATE
WEILMAN LORD
DAVY POWEREAS
LIMESTONE/ALKALINE FLYASH
COMBUSTION ENGINEERING
LIMESTONE/ALKALINE FLYASH
COMBUSTION ENGINEERING
LIME
CHEMICO
LIME
CHEMICO
MAGNFSIUM OXIDE
UNITED ENGINEERS
WELLMAN LORD
DAVY POWERGAS
WELLMAN LORD
DAVY POWEREAS
LIMESTONE
EiABCOCK 8 WILCOX
LinESTONE
RILEY STOKER/ENVIRONEERING
LIMESTONE
AIR CORRECTION DIVISION! UOP
LICE/LIMESTONE
AIR CORRECTION DIVISION, UOP
LIME/LIMESTONE
CHEMICO
LIMESTONE
TENNESSEE VALLfY AUTHORITY
LIMESTONE
RESEARCH CQTTRELL
LIMESTONE
RESEARCH COTTRELL
LIMESTONE
CHEMICO
LIME
CHEMICO
START-UP
DATE
5/76
4/74
4/74
6/76
7/76
3/76
4/77
12/75
7/77
9/75
4/78
8/78
7/77
8/78
4/77
4/72
4/72
5/77
4/77
5/78
5/78
5/78
                                                350

-------
                                        EPA UTILITY  F6D  SURVEY:  DECEMBER  1978  - JANUARY  1979
                                        SECTION  10
                        SUMMARY OF FGD  SYSTEMS  UNDER  CONSTRUCTION
CflMpAN* NAME/
UNIT NA«E UNIT NO-
ALABAMA ELECTRIC COOP
TONBI6BEE 3
ALLEGHENY POWER SYSTEM
PLEASANTS 1
ALLE6HENV POWER SYSTEM
PLEASANTS 2
ARIZONA ELECTRIC POWER COOP
APACHE 3
ARIZONA PUBLIC SERVICE
CHOLLA 4
ARIZONA PUBLIC SERVICE
FOUR CO«NERS 1
ARIZONA PUBLIC SERVICE
FOUR CORNERS 2
ARIZONA PUBLIC SERVICE
FOUR CORNERS 3
BASIN ELECTRIC POWER COOP
LARAMIE RIVER t
BASIN ELECTRIC POWER COOP
LARAMIE RIVER 2
BIS RIVERS ELECTRIC
6REEN 1
BI6 RIVERS ELECTRIC
GREEN 2
CENTRAL ILLINOIS PUBLIC SERV
NEWTON 1
CINCINNATI GAS I ELECTRIC
EAST BEND 2
COLORADO UTE ELECTRIC ASSN.
CRAIG t
COLORADO UTE ELECTRIC ASSN.
CRAIG 2
COMMONWEALTH EDISON
POWERTON 51
COOPERATIVE POWER ASSOCIATION
COAL CREEK 1
COOPERATIVE POWER ASSOCIATION
COAL CREEK 2
DELMARVA POWER I LIGHT
DELAWARE CITY 1-3
HOOSlER ENERGY
HER on 1
HQOSIER ENERGY
NEROI 2
INDIANAPOLIS POWER & LIGHT
PETERSBURG *
KANSAS POWER 8 LIGHT
NEW OR (
RETROFIT
NEW
NEW
NEW
NEW
NEW
RETROFIT
RETROFIT
RETROFIT
NEW
NEW
NEW
NEW
NEW
NEW
NEW
NEW
RETROFIT
NEW
NEW
RETROFIT
NEu
NEW
NEW
hEW
:APACITY
MW
179.Q
519.0
519.0
160.0
126.0
175.o
175.0
229.0
600.0
600.0
242.0
34?. 0
617.0
650.0
450.0
450.0
425.0
327.0
327.0
180.0
441.0
441.0
530.0
490.0
PROCESS/
SYSTEM SUPPLIER
LIMESTONE
PEABODY PROCESS SYSTEMS
LIME
BABCOCK E WILCOX
LIME
BABCOCK 6 WILCOX
LIMESTONE
RESEARCH COTTRELL
LIMESTONE
RESEARCH COTTRELL
LIME/ALKALINE FLVASH
CHEMICO
LIME/ALKALINE FLYASH
CHEMICO
LIME/ALKALINE FLYASH
CHFMICO
LIMESTONE
RESEARCH COTTRELL
LIMESTONE
RESEARCH COTTRELL
LIME
AMERICAN AIR FILTER
LIME
AMERICAN AIR FILTER
DUAL ALKALI
BUELL/ENVIROTECH
LIME
BABCOCK « WILCOX
LIMESTONE
PEABOOY PROCESS SYSTEMS
LIMESTONE
PEABODY PROCESS SYSTEMS
LIMESTONE
AIR CORRECTION DIVISION, UOP
LIME
COMBUSTION ENGINEERING
LIME
COMBUSTION ENGINEERING
WELLMAN LORD
DAVY POWERGAS
LIMESTONE
MITSUBISHI INTERNATIONAL
LIMESTONE
MITSUBISHI INTERNATIONAL
LIMESTONE
RESEARCH COTTRELL
LIMESTONE
START-UP
DATE
6/79
3/79
3/BO
4/79
6/80
0/79
0/79
0/79
4/80
10/80
12/79
12/80
11/79
10/81
3/79
3/79
7/79
5/79
10/80
4/80
4/81
1/82
10/83
6/80
JEFFREY
                                                     COMBUSTION ENGINEERING
                                            351

-------
EPA UTILITY  FGD  SURVEY:  DECEMBER 197B - JANUARY 1979
                                           SECTION 10
                             SUMMARY OF FGO SYSTEMS UNDER CONSTRUCTION
COMPANY NAME/
UNIT NAME UMT NO*
LOUISVILLk GAS & ELECTRIC
CANE RUfc t
LOUISVILLE GAS t ELECTRIC
MILL CREEK 1
LOUISVILLE GAS t ELECTRIC
MILL CREEK I
MINNESOTA POW£P 8 LIGHT
CLAY BOSKELL 4
OTTER TAIL POWFR
COYOTE 1
PACIFIC POWER t LIGHT
JIN BRIDGER 4
PENNSYLVANIA POWER
BRUCE MANSFIELD 3
SALT RIVER PROJECT
CORONADO 1
SALT RIV^R PROJECT
CORONADO 2
SAN *I6uEL ELECTRIC COOP
SAN MIGUEL 1
SIKESTON BOARD OF MUNIC. UTIL.
SlKESToN 1
SOUTHERN ILLINOIS POWER COOP
MARION 4
SOUTHERN INDIANA GAS « ELEc
A.B. BROWN 1
SOUTHERN MISSISSIPPI ELECTRIC
R.D. MORROW 2
SPRINGFIELD WATER, LIGHT ft PWR
&ALLMN 3
ST. JOE ZINC
G.F. WEATON 1
TENNESSEE VALLEY AUTHORITY
WIDOWS CREEK 7
TEXAS POWER I LIGHT
SANDOW *
TEXAS UTILITIES
MARTIN LAKE 3
UTAH POWER ( LIGHT
EMERY 1
UTAH POWER & LIGHT
EMERY 2
NEW OR
RETROFIT
RETROFIT
RETROFIT
NEW
NEW
NEW
NtW
NEW
NEW
NEW
NEW
NEW
NEW
NEW
NEW
NEW
RETROFIT
RETROFIT
NEW
NEW
NEW
NEW
CAPACITY
MW
278.0
350.0
495.0
475.0
440.0
550.0
917.0
280.0
280.0
400.0
235.0
184.0
265.0
124.0
205.0
60.0
575.0
382.0
595.0
360.0
360.0
PROCESS/
SYSTEM SUPPLIER
DUAL ALKALI
AOL/COMBUSTION EOUIP ASSOCIATE
LIME/LIMESTONE
COMBUSTION ENGINEERING
LIME
AMERICAN AIR FILTER
LIME/ALKALINE FLVASH
PEABQDY PROCESS SYSTEMS
AQUEOUS CARBONATE (DRY COLLECT
WHEELABRATOR-FRYE/R.I.
SODIUM CARBONATE
AIR CORRECTION DIVISION, UOP
LIME
PULLMAN KELLOGG
LIMESTONE
PULLMAN KELLOGG
LIMESTONE
PULLMAN KELLOGG
LIMESTONE
fABCOCK 8 WILCOX
LIMESTONE
BABCOCK & WILCOX
LIMESTONE
BABCOCK g WILCOX
DUAL ALKALI
FMC CORPORATION
LIMESTONE
RILEY STQKER/ENVIRONEERING
LIMESTONE
RESEARCH COTTRELL
CITRATE
BUREAU OF MINES
LIMESTONE
COMBUSTION ENGINEERING
LIMESTONE
COMBUSTION ENGINEERING
LIMESTONE
RESEARCH COTTRELL
LIME
CHfHICO
LIME
CHEM1CO
START-UP
BATE
3/79
4/81
7/81
5/80
5/81
9/79
4/80
8/79
1/8o
6/80
11/80
5/79
3/79
5/79
8/80
4/79
10/80
7/80
?/79
4/79
6/80
                                              352

-------
               EPA UTILITY KB SURVEY: DECEMBER  1«7S  - JANUARY  1979
              SECTION 11
SUMMARY Of CONTRACT AWARDED FGD SYSTEMS
COMPANY NAME/
UNIT NAME UNIT NO*
ARIZONA PUBLIC SERVICE
FOUR CORNERS *
ARIZONA PUBLIC SERVICE
FOUR CORNERS 5
ASSOCIATED ELECTRIC COOP
THOMAS HILL 3
BASIN ELECTRIC POWER COOP
ANTELOPE VALLEY 1
BASIN ELECTRIC POWER COOP
LARAMIE RIVER 3
EAST KENTUCKY POWER COOP
SPURLOCK 2
LAKELAND UTILITIES
NCINTOSH 3
LOUISVILLE tAS K ELECTRIC
MILL CREEK I
MONTANA PO«E*
COLSTRIP 3
MONTANA POWER
COLSTRIP 4
NIAGARA MOHAWK POWER COOP
CHARLES R. HUNTLEY 66
PUBLIC SERVICE OF NEW MEXICO
SAN JUAN 3
PUBLIC SERVICE OF NEW MEXICO
SAN JUAN 4
SOUTH CAROLINA PUBLIC SERVICE
WINYAH 3
SOUTHERN CALIFORNIA EDISON
ALAMITOS 6
SOUTHWESTERN ELECTRIC POWER
HENRY W. PERKEY 1
TENNESSEE VALLEY AUTHORITY
PARADISE 1
TENNESSEE VALLEY AUTHORITY
PARADISE 2
TEXAS MUNICIPAL POWER AGENCY
GIBBONS CREEK i
TEXAS UTILITIES
MARTIN LAKE 4
WISCONSIN POWER t LIGHT
NEW OR (
RETROFIT
RETROFIT
RETROFIT
NEW
NEW
NEW
NEW
NEW
RETROFIT
NEW
NEW
RETROFIT
NEW
NEW
NEW
RETROFIT
NEW
RETROFIT
RETROFIT
NEW
NEW
NEW
:APACITV
MW
7S5.0
755.0
670.0
440.0
600.0
500.0
364.0
350.0
700.0
700.0
100.0
534.0
534.0
300.0
175.0
720.0
704.0
704.0
400.0
750.0
316.0
PROCESS/
SYSTEM SUPPLIER
LIME
UNITED ENGINEERS
LIME
UNITED ENGINEERS
LIMESTONE
PULLMAN KELLOGG
LIME (DRY COLLECTION)
JOY MFG. COt WESTERN PRECIPITA
LIME (DRY COLLECTION)
BABCOCK 8 WILCOX
LIME
AOL/COMBUSTION EQUIP ASSOCIATE
LIMESTONE
BABCOCK K WILCOX
LIME/LIMESTONE
COMBUSTION ENGINEERING
LIME/ALKALINE FLYASH
AOL/COMBUSTION EBUIP ASSOCIATE
LIME/ALKALINE FLYASH
AOL/COMBUSTION EQUIP ASSOCIATE
AQUEOUS CARBONATE
ROCKWELL INTERNATIONAL
WELLMAN LORD
DAVY POWERGAS
WELLMAN LORD
DAVY POWERGAS
LIMESTONE
BABCOCK 6 WILCOX
LIME
SO. CALIFRONIA EDISON/STEARNS
LIMESTONE
AIR CORRECTION DIVISION, UOP
LIMESTONE
VENDOR NOT SELECTED
LIMESTONE
VENDOR NOT SELECTED
LIMESTONE
COMBUSTION ENGINEERING
LIMESTONE
RESEARCH COTTRELL
LlWfc/ALKALIHE FLYASH
START-UP
DATE
0/82
0/82
1/8?
11/81
4/82
3/80
10/81
4/82
7/80
7/81
0/fiJ
6/79
1/82
5/«0
1/82
3/84
0/8?
4/82
1/82
0/85
1/80
                   353

-------
FPA UTILITY F6D SURVEY: DECEMBER 1976 - JANUARY 1979
                                            SECTION 12
                                  SUMMARY OF PLANNED  F6D  SYSTEMS
    COMPANY NAME/                    NEW OR   CAPACITY  PROCESS/
    UNIT N*ME             UMT NO.  RETROFIT     MV     SYSTEB  SUPPLIER
                                                             STAfiT-UP
                                                               DATE
              LETTER OF INTENT SIGNED


                                    NEW
    NO"THERN STATES POKER
    SHERBURNE               3
    PHILADELPHIA ELECTRIC
    EOOYSTONE
                                    RETROFIT
IB
                     720.0
                     2*0-0
               RE8UESTIN6/EVALUATIN6  BIDS
    CENTRAL  ILLINOIS  LIGHT
    DUCK  CREEK              2


    HOUSTON  LIGHTING  I  POWER  CO.
    W.A.  pARlsH             6
     MIDDLE  SOUTH UTILITIES
     ARKANSAS  COAL           5

     MIDDLE  SOUTH UTILITIES
     ARKANSAS  COAL           6

     MIDDLE  SOUTH UTILITIES
     LOUISIANA  COAL          1

     MIDDLE  SOUTH UTILITIES
     LOUISIANA  COAL          2

     MIDDLE  SOUTH UTILITIES
     MISSISSIPPI COAL        1

     MIDDLE  SOUTH UTILITIES
     MISSISSIPPI COAL        2

     PUBLIC  SERVICE  OF  INDIANA
     GIBSON                  5

     TENNESSEE  VALLEY  AUTHORITY
     40HNSONVILLE            1-10

     TEXAS  UTILITIES
     FOREST  GROVE            1

               CONSIDERING  F€D  SYSTEMS

     ALLEGHENY  POWER SYSTEM
     MITCHELL                3

     BASIN  ELECTRIC  POWER COOP
     ANTELOPE  VALLEY        2

     CENTRAL MAINE  POWER
     SEARS  ISLAND            1

     COLUMBUS  & SOUTHERN OHIO ELEC .
     POSTON                  5

     COLUMBUS  £ SOUTHERN OHIO ELEC.   NEW
     POSTON                  6

     GENERAL pUBLIC  UTILITIES
     COHO                   1

     GENERAL PUBLIC  UTILITIES
     SEWARD                  7

     LOUISVILLE GAS  t  ELECTRIC
     TRIMBLE COUNTY          1

     LOUISVILLE GAS  t  ELECTRIC
     TRIMBLE COUNTY          2
NEW
NEW
NEW
NEW
NEW
NEW
NEW
NEW
NEW
RETROFIT
NEW

-------
           EPA UTILITY FGD SURVEY! DECEMBER  197S  - JANUARY  1979
          SECTION 12
SUMMARY OF PLANNED F6D SYSTEMS
COMPANY NAME/
UNIT N«Mt UNIT NO.
NEVADA POWER
HARRY ALLEN 1
NEVADA POWER
HARRY ALLEN 2
NEVADA POWER
HARRY ALLEN 3
NEVADA POWER
HARRY ALLEN 4
NEVADA POWER
REID GARDNER 4
NEVADA POWER
WARNER VALLEY 1
NEVADA POWER
WARNER VALLEY 2
NORTHED INDIANA pUb SERVICE
BAILLY 7
NORTHERN INDIANA PUB SERVICE
BAILLY 6
PACIFIC GAS & ELECTRIC
FOSSIL 1
PACIFIC 6AS & ELECTRIC
FOSSIL 2
PHILADELPHIA ELECTRIC
CROMBY
PHILADELPHIA ELECTRIC
EDDYS TONE 2
POTOMAC ELECTRIC POWER
DICKERS ON 4
POWER AUTHORITY OF NEW YORK
ARTHUR KILL
SALT RIVER PROJECT
CORONADO 3
SEMINOLE ELECTRIC
SEKINOLE 1
SOUTHERN ILLINOIS POWER COOP
MARION 5
TAMP* ELECTRIC
BIG BEND 4
TENNESSEE VALLEY AUTHORITY
CUMBERLAND
TEXAS POWER i LIEHT
TWIN OAKS 1
TEXAS POWER g LI6HT
TWIN OAKS 2
TEXAS UTILITIES
MILL CREEK 1
TEXAS UTILITIES
MILL CREEK 2
NEW OR I
RETROFIT
NEW
NEW
NEW
NEW
NEW
NIW
NEW
RETROFIT
RETROFIT
NEW
MEW
RETROFIT
RETROFIT
NEW
NEW
NEW
NEW
NEW
NEW
RETROFIT
NEW
NEW
NEW
NEW
:APACITY
NU
500.0
SOO.O
500.0
$00.0
250.0
250.0
2SO.D
190.0
400.0
800.0
800.0
150.0
334.0
800.0
700.0
280.0
620.0
300.0
450.0
600.0
750.0
750.0
750.0
750.0
PROCESS/
SYSTEM SUPPLIER
PROCESS NOT SELECTED
VENDOR NOT SELECTED
PROCESS NOT SELECTED
VENDOR NOT SELECTED
PROCESS NOT SELECTED
VENDOR NOT SELECTED
PROCESS NOT SELECTED
VENDOR NOT SELECTED
PROCESS NOT SELECTED
VENDOR NOT SELECTED
PROCFSS NOT SELECTED
VENDOR NOT SELECTED
PRQCFsS NOT SELECTED
VENDOR NOT SELECTED
PROCESS NOT SELECTED
VENDOR NOT SELECTED
PROCESS NOT SELECTED
VENDOR NOT SELECTED
LIMESTONE
VENDOR NOT SELECTED
LIMESTONE
VENDOR NOT SELECTED
MAGNESIUM OXIDE
UN1TEC ENGINEERS
MAGNESIUM OXIDE
UNITED ENGINEERS
PROCESS NOT SELECTED
VENDOR NOT SELECTED
PROCESS NOT SELECTED
VENDOR NOT SELECTED
LIMESTONE
VENDOR NOT SELECTED
LIMESTONE
VENDOR NOT SELECTED
PROCESS NOT SELECTED
VENDOR NOT SELECTED
PROCESS NOT SELECTED
VENDOR NOT SELECTED
PROCESS NOT SELECTED
VENDOR NOT SELECTED
LIMESTONE
VENDOR NOT SELECTED
LIMESTONE
VENDOR NOT SELECTED
PROCESS NOT SELECTED
VENDOR NOT SELECTED
PROCESS NOT SELECTED
VENDOR NOT SELECTED
START-UP
DATE
6/85
6/86
6/87
6/88
0/83
6/84
6/85
O/ 0
C/ 0
0/R5
0/86
6/80
6/80
5/fl5
11/88
0/87
6/83
0/84
0/85
7/82
8/63
9/84
0/85
0/86
              355

-------
EPA UTILITY fGO SURVEY: OECtMBER 1978 - JANUARY 1979
                                            SECTION 13
                         TOTAL fGO UMTS AND CAPACITY  (HU) INSTALLED BY YEAR
YEAR
1968
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
UNDEFINED
NEy
NO.
1
3
8
7
3
6
8
10
13
22
24
9
17
6
8
10
5
5
20
ON LINE
My
0.
420.
2*0.
1473.
250.
1971.
2051.
4664.
470*.
7198.
9453.
4630.
8650.
2965.
4306.
6365.
3830.
2270.
12*0.
TERMINATED
NO. MW
0
0
0
1
0
0
1
0
0
0
0
0
0
0
1
0
0
0

0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
250.
0.
0.
0.

TOTAL ON LINE
NO. MU
1 0.
4
12
18
21
27
34
44
57
79
103
112
129
135
142
152
157
162

420.
660.
2133.
2363.
4354.
6405.
11069.
15773.
22971.
32124.
37054.
45904.
48869.
52925.
59?9Q.
63120.
65390.

                                               356

-------
                                            EPA  UTILITY F6D SURVEY: DECEMBER 1978 - JANUAOY 1<>79

                                          SECTION  U
              DESIGN AMD PERFORMANCE  DATA  FOR OPERATIONAL PARTICULAR SCRUBBERS
COHPANY NAME                                    COMMONWEALTH
PLANT NAME                                      WILL COUNTY
UNIT NUMBER                                     1
CITY                                            ROMEOVjLLE
STATE                                           ILLINOIS
REGULATORY CLASSIFICATION                       ******
PARTICULATE EMISSION LIMITATION - N6/J             0.
S02 EMISSION LIMITATION  -  NG/J                   774.
NET PLANT GENERATING CAPACITY - MU
GROSS UNIT GENERATING  CAPACITY - MH
NET UNIT GENERATING  CAPACITY W/FGD - MU
NET UNIT GENERATING  CAPACITY UO/FGD - MW
EQUIVALENT  SCRUBBED  CAPACITY - MU

** BOILER  DATA
    SUPPLIER
    TYPE
    SERVICE LOAD
     COMMERCIAL  SERVICE DATE
    MAXIMUM BOILER FLUE GAS FLOW - CU.M/S
     FLUE  GAS  TEMPERATURE - C
     STACK  HEIGHT  - M
     STACK  TOP DIAMETER - M

 ** FUEL DATA
     FUEL  TYPE
     FUEL  GRADE                                   ******
     AVERAGE HEAT  CONTENT - KJ/K6                 22260.
     RANGE HEAT  CONTENT - BTU/LB
     AVERAGE ASH CONTENT - X                         7.40
     RANGE ASH CONTENT - X                       3-16
     AVERAGE MOISTURE CONTENT  - X                ********
     RANGE  MOISTURE CONTENT -  X                  ******
     AVERAGE SULFUR CONTENT -  X                      1.50
     RANGE SULFUR  CONTENT - X                    0.3  -  4.5
     AVERAGE CHLORIDE CONTENT  - X                ********
     RANGE CHLORIDE CONTENT -  X                  ******
     FUEL  FIRING RATE - M T /H                       77.1
     FUEL FIRING RATE - MU                         167
                                                              (  .000 (.B/MMBTU)
                                                              ( 1.600 LB/MMBTU)
                                                 167.0
                                                 137.0
                                                    .0
                                                    .0
                                               BABCOCK 8 WILCOX
                                               UET BOTTOM, CYCLONE
                                               CYCLIC
                                                0/55
                                                 363.36        C 770000 ACFM)
                                                 179.4         ( 355 F>
                                                 107-          ( 350 FT)
                                                   3.R         < 12.4 FT)
                                                               (  9570 BTU/LB)
                                                               9,100 - 10,500
                                                               {  65 TPH)
** ESP
    NUMBER
    TYPE
    SUPPLIER
    PARTICULATE DESIGN REMOVAL EFFICIENCY  -  X
    FLUE  GAS  TEMPERATURE - C

** PARTICULATE SCRUBBER
    NUMBER
    TYPE
    SUPPLIER
    SHELL MATERIAL
    LINING  MATERIAL
    TYPE  OF NOZZLES
    FLUE  GAS  CAPACITY - CU.M/S
    FLUE  GAS  TEMPERATURE - C
    LI«UID  RECIRCULA-TION RATE - LITER/S
    L/6 RATIO - LITER/CU.M
    PRESSURE  DROP - KPA
    SUPERFICIAL GAS VELOCITY  - M/S
    PARTICULATE INLET LOAD -  6/CU.*
    PARTICULATE DESIGN REMOVAL EFFICIENCY  -  X
                                                  1
                                                 COLD SIDE
                                                 WESTERN PRECIPITATION (JOY MANUFACTURING)
                                                    79.0
                                                   179.4        (  355 F)
                                                 ADJUSTABLE THROAT VENTURI
                                                 BARCOCK S WILCOX
                                                 CARBON STEEL
                                                 PLASITE AND KAOCRtTE
                                                 STAINLESS STEEL
                                                   181-7
                                                   179.4
                                                   365.4
                                                     2.4
                                                     a. ?.
                                                    36.6
                                                       .4
                                                    9fl.O
( 385000  ACFM)
(  355  F)
{ 5600  GPf!)
(18.0 GAL/1000ACF)
<    <3  1N-H20)
(  120.0  FT/S)
(   .16 GR/SCF)
                                               357

-------
EPA UTILITY FGD SURVEY: DECEMBER  1«7fl  - JANUARY 1979

                                            SECTION U
                DESIGN  AND  PERFORMANCE  DATA FOR OPERATIONAL PARTICULATE SCRUBBERS
 COMPANY NAME
 PLANT NAME
 UNIT NUMBER
 CITY
 STATE
 REGULATORY CLASSIFICATION
 PARTICULATE  EMISSION  LIMITATION - NG/J
 S02  EMISSION  LIMITATION  -  KG/J
 NET  PLANT  GENERATING  CAPACITY  - MVf
 GROSS UNIT GENERATING CAPACITY - Mb
 NET  UNIT GENERATING  CAPACITY V/FGD - HW
 NET  UNIT GENERATING  CAPACITY WO/FGD - MW
 EQUIVALENT SCRUBBED  CAPACITY - MW

 ** BOILER  DATA
      SUPPLIER
      TYPE
      SERVICE  LOAD
      COMMERCIAL  SERVICE DATE
      MAXIMUM  BOILER FLUE  GAS FLOW - CU.K/S
      FLUE GAS  TEMPERATURE - C
      STACK  HEIGHT  - M
      STACK  TOP D1AMETFR - M

  **  FUEL DATA
      FUEL  TYPE
      FUEL  GRADE
      AVERAGE  HEAT  CONTENT - KJ/K6
      RANGE  HEAT  CONTENT - BTU/LEl
      AVERAGE  ASH CONTENT - *
      RANGE  ASH CONTENT - X
      AVERAGE  MOISTURE CONTENT - X
      RANGE  MOISTURE CONTENT - X
      AVERAGE  SULFUR CONTENT - X
      RANGE  SULFUR  CONTENT - X
      AVERAGE  CHLORIDE CONTENT - X
      RANGE  CHLORIDE CONTENT - X
      FUEL  FIR1N6 RATE - M T/h
      FUEL  F IR1NG RATE - MU

  **  ESP

  **  MECHANICAL COLLECTOR

  **  PARTICULATE  SCRUBBER
      NUMBER
      TYPE
                (****** LB/MMBTU)
                ( 3.200 LB/MMFITU)
DETROIT EDISON
ST. CLAIR
6
BELLE RIVER
MICHIGAN
C
***** *
 1376.
 1775.0
  325.0
*******
     .0
     .0
COMBUSTION ENGINEERING
COAL FIRED TWO-STAGE  SUPERHEATER
BASE
 0/61
********        (******* ACFM)
  132.2         < 270  F>
******          (****  FT)
*******         (*****  FT)
COAL
SUBBITUMINOUS
*******

    4.no
******
********
22 - 24
********
0.3 - 0.4
***** ***
******
  120.6
*****
                (******  BTU/LB)
                 9,500 - 9,600
                (133  TPH)
                                                 VENTURI
                                                 356

-------
                                             EPA  UTItlTY F6D  SURVEY: DECEMBER  1978  - JANUARY 1979

                                           SECTION  14
               DESIGN AND PERFORMANCE DATA  FOB OPERATIONAL PARTICULATE  SCRUBBERS
COMPANY NAME
PLANT NAME
UN IT NUMBER
CJITY
S TATE
P.E6ULATORY CLASSIFICATION
(•ARTICULATE EMISSION LIMITATION - NG/J
S02 EMISSION LIMITATION - NG/J
NET PLANT GENERATING CAPACITY - MW
GROSS UNIT GENERATING CAPACITY — Kfc
NET UNIT GENERATING CAPACITY V/F6o - MB
NET UNIT GENERATING CAPACITY WO/FGfc - MW
E«UIVALENT SCRUBBED CAPACITY - MU
MINNESOTA POWER t LIGHT
AURORA
1
AURORA
MINNESOTA
******
0. < .000 (.B/KMBTU)
****** <****** LP/HMBTU)
116.0
58.0
.0
.0
** BOILER DATA
    SUPPLIER
    TYPE
    SERVICE LOAD
    COMMERCIAL SERVICE  DATE
    MAXIMUM BOILER  FLUE GAS  FLOW - CU.M/S
    FLUE GAS TEMPERATURE  - C
    STACK HEIGHT  -  K
    STACK TOP  DIAMETER  -  M

** FUEL DATA
    FUEL TYPE
    FUEL GRADE
    AVERAGE HEAT  CONTENT  - KJ/KG
    RANGE HEAT CONTENT  -  BTU/LB
    AVERAGE ASH  CONTENT - *
    RANGE ASH  CONTENT  - X
    AVERAGE MOISTURE  CONTENT - X
    RANGE MOISTURE  CONTENT - X
    AVERAGE SULFUR  CONTENT - X
    RANGE SULFUR  CONTENT  - X
    AVERAGE CHLORIDE  CONTENT - X
    RANGE CHLORIDE  CONTENT - X
    FUEL FIRING  RATE  -  M  T/H
    FUEL FIRING  RATE  -  MU

 ** PARTICULATE SCRUBBER
    NUMBER
    TYPE
    SUPPLIER
    SHELL MATERIAL
    LINING  MATERIAL
    BOILER  LOADlSCRU-BfiER  -  X
     FLUE GAS  CAPACITY  - CU .M/S
     FLUE GAS  TEMPERATURE  -  C
     L/G RATIO - LITER/CU.M
     PRESSURE  DROP - KPA
     SUPERFICIAL GAS VELOCITY  -  M/S
     PARTICULATE INLET  LOAD  -  S/CU.M
     PARTICULATE OUTLET LOAD  - G/CU.P
     S02 INLET CONCENTRATION  - PPM
     SOZ OUTLET CONCENTRATION  -  PPM
     502 DESIGN REMOVAL EFFICIENCY  - X
COMBUSTION ENGINEERING
PULVERIZED COAL
******
 0/53
********        (******
*******         (**** F)
******          (**** FT)
*******         {***** FT)
COAL
SUBBITUMINOUS
 2CHC>9.

********
******
   Z6.70
******
    1.37
******
********
******
*******
*****
             (   8800 BTU/LB)
             ******
             (***  TPH)
  1
 ELBAIR  SPRAY-IMPINGEMENT
 KREBS ENGINEERING
 316  ELC  STAINLESS  STEEL
 FLAKE-POLYESTER
   1-00 .0
                ( 291160  ACFM)
                t  340 F>
                ( 8.3 GAL/1000ACF)
                (    3 IN-H20)
                I    7.0  FT/S)
                (  2.06 6R/SCF)
                (  .040 GR/SCF)
137.4
171.1
  1.1
   .7
  2.1
  4.7
   .1
800.000
500.000
 37.0
                                                359

-------
fPA UTILITY F6D SURVEY: DSUMBF.P  197F  - JANUARY 1979

                                            SECTION U
                DESIGN  AND  PERFORMAKCE  DATA FOR OPERATIONAL PARTICULATE  SCRUBBERS
 COMPANY NAME
 PLANT NAME
 UNIT NUMBER
 CITY
 STATE
 RE6ULATORV  CLASSIFICATION
 PARTICULATE  EMISSION  LIMITATION - NG/J
 S02  EMISSION  LIMITATION  -  NG/J
 NET  PLANT  GENERATING  CAPACITY - RU
 GROSS UN]T  GENERATING CAPACITY - MW
 NET  UNIT  GENERATING CAPACITY U/FGD - Mw
 NET  UNIT  GENERATING CAPACITY UO/F6D - MW
 EQUIVALENT  SCRUBBED CAPACITY - «W

 •* BOILER  DATA
      SUPPLIER
      TYPE
      SERVICE LOAD
      COMMERCIAL SERVICE DATE
      MAXIMUM BOILER FLUE  GAS FLOW - CU.M/S
      FLUE  GAS TEMPERATURE . C
      STACK  HEIGHT - M
      STACK  TOP DIAMETER - M

  **  FUEL DATA
      FUEL  TYPE
      FUEL  GRADE
      AVERAGE HEAT CONTENT - KJ/KG
      RANGE  HEAT CONTENT - BTU/L6
      AVERAGE ASH CONTENT - *
      RANfE  ASH CONTENT - X
      AVERAGE nOJSTURE  CONTENT  - %
      RANGE  MOISTURE CONTENT -  1
      AVERAGE SULFUR CONTENT -  X
      RANGE  SULFUR CONTENT - X
      AVERAGE CHLORIDE  CONTENT  - X
      RANGE  CHLORIDE CONTENT -  X
      FUEL  FIRING RATE  - M T/H
      FUEL  FIRING RATE  - MW

  *•  PARTICULATE SCRUBBER
      NUMBER
      TYPE
      SUPPLIER
      SHELL MATERIAL
      LINING MATERIAL
      BOILER LOAO/SCRUSBER - X
      FLUE  GAS CAPACITY - CU.M/S
      FLUE  GAS TEMPERATURE - C
      L/G RATIO - LITER/CU.M
      PRESSURE DROP - KPA
      SUPERFICIAL GAS VELOCITY  - MS
      PARTICULATE INLET LOAD -  G/CUtH
      PARTICULATE OUTLET LOA6 - G/CU.K
      SOJ INLET CONCENTRATION - PPW
      S02 OUTLET CONCENTRATION  - PPM
      SO2 DESIGN REMOVAL EFFICIENCY - I
                (   .000
                (****** LR/MMBTU)
MINNESOTA POWER ft  LIGHT
AURORA
2
AURORA
MINNESOTA
******
    0.
******
  116.0
*** ****
   58.0
      .0
      .0
COMBUSTION ENGINEERING
PULVERIZED COAL
******
 0/55
********       (******* ACFH)
*******        (•***  F)
******         <***"*  FT)
*******        (*****  FT)
COAL
SUBB1TUMI NOUS
 20469.

********
******
   26.70
******
    1.37
******
********
******    .,
                (   6800  BTU/LB)
                ******
*****
                (*** TPH)
EL6AIR SPRAY-IMPINGEMENT
KRESS ENGINEERING
316 ELC STAINLESS  STEEL
FLAKE-POLYESTER
  100.0
  137.4
  171.1
    1.1
      .1
  800.000
  $00.000
   37.0
                  291UO ACFM)
                   340  f>
                  8.3 GAL/1000ACF)
                     3  IN-HZO)
                     7.0 FT/S)
                   2.06 6R/SCF)
                   .0*0 SR/SCF)
                                                 360

-------
                                              EPA  UTILITY FGD SURVEY: DECEMBER 1978 - JANUARY 1«7
-------
EpA UTILITT  F6D  SURVEY: DECEMBER  197E  - JANUARY 1979
                                             SECTION 14
                 DESIGN AND PERFORMANCE  DATA FOR OPERATIONAL  PARTICIPATE SCRUBBERS
 COMPANY  NAME
 PLANT  NAME
 UNIT NUMBER
 CITY
 STATE
 REGULATORY  CLASSIFICATION
 PARTICULATE EMISSION LIMITATION  -  KG/J
 S02  EMISSION  LIMITATION  -  NG/J
 NET  PLANT GENERATING CAPACITY  -  MW
 GROSS  UNIT  GENERATING  CAPACITY - MW
 NET  UNIT GENERATING CAPACITY W/F6D - !«>•'
 NET  UNIT GENERATING CAPACITY WO/FGt - KW
 EOUIVALENT  SCRUBBED CAPACITY - MW

 ** BOILER DATA
      SUPPLIER
      TYPE
      SERVICE LOAD
      COMMERCIAL SERVICE  DATE
      MAXIMUM BOILER  FLUE GAS FLOW - CU.M/S
      FLUE GAS TEMPERATURE  - C
      STACK HEIGHT  -  M
      STACK TOP  DIAMETER  - M

  ** FUEL DATA
      FUEL TYPE
      FUEL GRADE
      AVERAGE HEAT  CONTENT - K J/KG
      RANGE HEAT CONTENT - BTU/LB
      AVERAGE ASH CONTENT - *
      RANGE ASH  CONTENT  - X
      AVERAGE MOISTURE CONTENT  - JE
      RANGE MOISTURE  CONTENT - X
      AVERAGE SULFUR  CONTENT - X
      RANGE  SULFUR  CONTENT - X
      AVERAGE CHLORIDE CONTENT  - X
      RANGE CHLORIDE  CONTENT -  X
      FUEL FIRING RATE - M T/H
      FUEL FIRING RATE - KM
PACIFIC POWER  K LIGHT
DAVE JOHNSTON
It
GLENROCK
WYOMING
******
    0.
<   .000 LB/WM8TU)
<****** LB/MHBTU)
*******
  530.0
      .0
      .0
COMBUSTION  ENGINEERING
PULVERIZED,  COAL
******
* * /**
********        (******» ACFMJ
*******         <**** f)
   76.          < 250 FT)
*******         (***** FT)
COAL
SUBBITUMINOUS
 172P2.

    12.00
* *****
    2«.00
***** *
      .50
* *****
      .04
******
*******
*****
(  74JO BTU/LB)
 ******
(*** TPH)
  ** ESP
  ** PARTICULATE  SCRUBBER
      NUMBER
      TTPE
      SUPPLIER
      LINING MATERIAL
      FLUE GAS  CAPACITY - CU.M/S
      FLUE GAS  TEMPERATURE - C
      LIOU1D RECIRCULATION RATE -LITFR/S
      L/G RATIO - LITEH/CU.M
      PRESSURE  DROP  - KPA
      PARTICULATE INLET LOAD - G/CU.C
      PARTICULATE DESIGN REMOVAL EFFICIENCY
      $02 INLET CONCENTRATION - PPM
      S02 DESIGN  REMOVAL EFFICIENCY  - i
VENTURl
CHEMICO
POLYESTER-LINED STEEL
   327.5
   135.0
   409.5
     1.3
     2.5
     9.2
    99.7
   459.000
    40.0
< 694000 ACFCi)
(  275  F)
( 6500  GPM)
t 9.4 GAL/10OQACF)
(   10  IN-H2IO)
(  4.00 GR/!iCF>
                                                  362

-------
                                             EPA UTILITY FGD SURVEY: DECEMBER 1978 - JANUARY 1979

                                           SECTION U
               DESIGN AND  PERFORMANCE  DATA FOR OPERATIONAL PARTICIPATE SCRUBBERS
COMPANY  NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICULATE EMISSION LIMITATION  - NG/J
SOZ EMISSION LIMITATION  -  K6/J
NET PLANT GENERATING CAPACITY -  MW
6ROSS UNIT GENERATING  CAPACITY - «U
NET UNIT 6ENERATIN6 CAPACITY W/F&6 - Mil
NET UNIT GENERATING CAPACITY WO/FGti - MU
EQUIVALENT SCRUBBED CAPACITY - HU

**  BOILER DATA
     SUPPLIER
     TYPE
     SERVICE LOAD
     COMMERCIAL  SERVICE DATE
     MAXIMUM BOILER  FLUE GAS FLOW - CU.M/S
     FLUE  GAS TEMPERATURE - C
     STACK HEIGHT  -  M
     STACK TOP  DIAMETER - M

 ** FUEL DATA
     FUEL  TYPE
     FUEL  GRADE
     AVERAGE  HEAT  CONTENT - KJ /KG
     RANGE HEAT  CONTENT - 6TU/LB
     AVERAGE  ASH CONTENT - X
     RANGE ASH  CONTENT - X
     AVERAGE MOISTURE  CONTENT  -  X
     RANGE MOISTURE  CONTENT -  X
     AVERAGE SULFUR  CONTENT -  X
     RANGE SULFUR  CONTENT - t
     AVERAGE CHLORIDE  CONTENT  -  X
     RANGE CHLORIDE  CONTENT -  X
     FUEL FIRING RATE  - M T /H
     FUEL FIRING RATE - KW
POTOMAC ELECTRIC POWER
CHALK POINT
A
******
MAPVLNAD
******
    o.
******
 189Z.Q
  630.0
  630.0
      .0
      .0
******
******
BASE
«*/*«
********
*******
******
*******
 OIL
 ******
 *******

 ********
 ******
 ***** ***
 ******
 ********
<  .000 LB/MMBTU)
(****** LB/MMBTU)
(******* ACFM)
(**** F)
(***'* FT)
(***** FT)
(****** BTU/LR)
 ******
 **
    ***
                (*** TPH)
                                                363

-------
EPA UTILITY F6D SURVEY: DECEMBER  197?  -  JANUARY 1979

                                            SECTION U
                DESIGN  AND  PERFORMANCE  DATA  FOR OPERATIONAL PARTICIPATE SCRUBeERS
 COMPANY NAME
 PLANT NAME
 UNIT NUMBER
 CITY
 STATE
 REGULATORY CLASSIFICATION
 PARTICULATE  EMISSION  LIMITATION  - NG/J
 SOJ  EMISSION  LIMITATION  •  NG/J
 NET  PLANT  GENERATING  CAPACITY -  MW
 GROSS UNIT ffcNERATING CAPACITY - Mfc
 NET  UNIT GENERATING CAPACITY V/F6D - MW
 NET  UNIT GENERATING CAPACITY WO/FGD - MU
 ECIUIVALENT SCRUBBED CAPACITY - MW
    POTOMAC  ELECTRIC POWER
    DICKERSON
     DlCKERSON
     MARYLAND
     ******
         0.
       688.
       54*.0
       190.0
       181.0
          .0
          .0
               (  .000 UB/MMBTU)
               ( 1.600 LB/MMPTU)
  **  BOILER  DATA
      SUPPLIER
      TYPE
      SERVICE LOAD
      COMMERCIAL  SERVICE DATE
      MAXIMUM BOILER FLUE GAS FLOW - CU.M/S
      FLUE  GAS  TEMPERATURE - C
      STACK  HEIGHT - M
      STACK  TOP DIAMETER - M

  ••  FUEL DATA
      FUEL  TYPt
      FUEL  GRADE
      AVERAGE HEAT CONTENT • KJ /KG
      RANGE  HEAT  CONTENT - 8TU/LB
      AVERAGE ASH CONTENT - X
      RANGE  ASH CONTENT - *
      AVERAGE MOISTURE CONTENT - X
      RANGE  MOISTURE CONTENT - *
      AVERAGE SULFUR CONHNT - X
      RANGE  SDLfUR CONTENT - X
      AVERAGE CHLORIDE CONTENT - X
      RANGE  CHLORIDE CONUNT - *
      FUEL  FIRING RATE - M T/H
      FUEL  FIRING RATE - MU

  **  ESP
     COMBUSTION ENGINEERING
     DRV  BOTTOM i  PULVERIZED COAL
     BASE
      0/6?
       ?78.«2       < 590000 ACFM)
       126.1         < 259 F)
       122.          t 400 FT)
     *******         (****« FT)
     COAL
     ******
      272U.

        14.00
     ******
     ********
     ******
         ?.oo
     ******
     * *******
     ******
        67.1
     *****
               I 11700 BTU/LB)
                ******
               ( 74 TPH)
      SUPPLHR
      PARTICULATE DESIGN REMOVAL EFFICIENCY

  «* PARTICULATE SCRUBBER
      NUMBER
      TYPE
      SUPPLIER
      BOILER LOAD/SCRUBBER - X
      FLUE GAS CAPACITY - CU.M/S
      FLUE GAS TEMPERATURE - C
      L/G RATIO - LITER/CU.M
      PRESSURE DROP - KPA
     RCSEARCH-COTTRELL
- X     94.0
 1
ADJUSTABLE VENTURI
CHEMJCO
   50.0
  139.2
  126.1
    2.7
                    ( 295CIOO ACFM>
                    (  259 F)
                    (20.0 6AL/1000ACf>
                    (   11 IN-H20)
                                                364

-------
                                          EPA UTILITY  FGD SURVEY: DECEMBER  1978  - JANUARY 1979

                                         SECTION  14
             DESIGN AND PERFORMANCE DATA  FOR OPERATIONAL PARTKULATE SCRUBBERS
COMPANY  NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY  CLASSIFICATION
PHRTICULATE EMISSION LIMITATION -
SOZ EMISSION  LIMITATION - NG/J
NET PLANT GENERATING CAPACITY  - MW
GROSS UNIT GENERATING  CAPACITY - MM
NET UNIT GENERATING CAPACITY V/fGO  -  HU
NET UNIT GENERATING CAPACITY WO/FGS - KW
E8UIVALFNT SCRUBBED CAPACITY - MW

**  BOILER  DATA
     SUPPLIER
     TYPE
     SERVICE LOAD
     COMMERCIAL SERVICE  DATE
     MAXIMUM BOILER  FLUE GAS FLOW -  CU.K/S
     FLUE GAS TEMPERATURE  -  C
     STACK  HEIGHT  -  H
     STACK  TOP  DIAMETER -  M

 *«  FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT  CONTENT  -  KJ/KG
     RANGE  HEAT CONTENT -  BTU/LB
     AVERAGE AsH  CONTENT - X
     RANEE  ASH  CONTENT  - X
     AVERAGE MOISTURE  CONTENT - *
     RANGE  MOISTURE  CONTENT  - X
     AVERAGE  SULFUR  CONTENT  - X
     RANEE  SULFUR  CONTENT  -  X
     AVERAGE  CHLORIDE  CONTENT - X
     RANGE  CHLORIDE  CONTENT  - X
     FUEL FIRING  RATE  - M  T /H
     FUEL FIRING  RATE  - MW

 *« FUEL DATA
     FUEL TYpi
     FUEL GRADE
     AVERAGE  HEAT CONTENT - KJ /KG
     RANGE  HEAT CONTENT - BTU/li
     AVERAGE  ASH CONTENT -  X
     RANGE  ASH CONTENT - X
     AVERAGE  MOISTURE  CONTENT
     RANGE  MOISTURE CONTENT - X
     AVERAGE  SULFUR CONTENT - X
     RANGE SULFUR CONTENT - X
     AVERAGE  CHLORIDE  CONTENT
     RANGE CHLORIDE CONTENT - X
     FUEl FIRING RATE - M T /H
     FUEL FIRING RATE  - MW

  ** ESP
     NUMBER

  «* MECHANICAL COLLECTOR
               (  .000
               {****** LB/MMBTU)
                             - X
                             - X
                                             PUBLIC  SERVICE  OF  COLORADO
                                             ARAPAHOE
                                             4
                                             DENVER
                                             COLORADO
                                             ******
                                                  0.
                                             ******
                                             *******
                                             *******
                                                112.0
                                                   .0
                                                   .0
                                              ******
                                              PULVERIDED, COAL
                                              ******
                                               0/55
                                              ********       (*******  ACFM)
                                              *******        (****  f)
                                              ******         (****  FT)
                                              *******        (**«** FT)
                                              COAL
                                              SUBBITUMINOUS
                                               Z3725.

                                                  9.30
                                              ******
                                                 13.70
                                              ***** *
                                                   .95
                                              ******
                                                   .01
                                              ******
                                              *******
                                              *****
COAL
******
 Z34«3.

   12.50
******
   11.20
******
      .65
******
      .01
******
*******
*****
               <  10200  BTU/LB)
                ******
               <*** TPH)
                                                              ( 10100 BTU/LB)
                                                              ******
                                                              (*** TPH>
•*  PARTICULATE SCRUBBED
    NUMBER
    TYPE
    SUPPLIER
    NUMBER OF  STAGES
    SHELL MATERIAL
    LINING MATERIAL
    INTERNAL MATERIAL
    L/fi RATIO  - LITER/CU.M
    SUPERFICIAL 6AS  VELOCITY  -  M/S
    PARTICULATE INLET  LOAD  -  G/CU.P
    PARTICULATE OUTLET LOAD - G/CU.M
    PARTICULATE DESIGN REMOVAL  EFFICIENCY
    S02 INLET  CONCENTRATION - PPM
                                                  1
                                                 TCA
                                                 UOP
                                                     J
                                                 CARBON  STEEL
                                                 RURBfR
                                                 STAINLESS  STEEL
                                                     7.5
                                                     7.*
                                                     1.8
                                                      .0
                                                    93.0
                                                   SOO.OOO
                (S6.0 tALMQOOACO
                (    11.0 FT/S)
                (    .PO GR/SCF)
                (   .070 GR/SCF)
                                              365

-------
FPA UTILITY FGD SURVEY!  DECtMBER 197? - JANUARY 1979

                                            SECTION  14
                DESIGN  AND  PERFORMANCE DATA FOR OPERATIONAL PARTICIPATE SCRUBBERS
— »«••• »••••.•« • •.«..» A AAV »•• ••• ••• •••^••^^•••••i •••"..»__••.•••—••••<••• •••« — •••— ••••.•»•.•••!• B B» •• K* I

     SO2 OUTLET CONCENTRATION - PPM               350.000
     SO; DESIGN REMOVAL  EFFICIENCY - X              30.0
                                                366

-------
                                              EPA UTILITY F60  SURVEY:  DECEMBER 1978 - JANUARY  1979

                                            SECTION U
               DESIGN  AND PERFORMANCE  DATA FOR OPERATIONAL PARTICIPATE SCRUBBERS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY CLASSIFICATION
PARTICIPATE  EMISSION LIMITATION  - N6/J
S02 EMISSION  LIMITATION - N6/J
NET PLANT  GENERATING CAPACITY -  MU
GROSS UNtT GENERATING CAPACITY - Mk
NET UNIT GENERATING CAPACITY U/F60 - MW
NET UNIT GENERATING CAPACITY UO/FGD - MW
EQUIVALENT SCRUBBED CAPACITY - MW

«* BOILER  DATA
     SUPPLIER
     TYPE
     SERVICE  LOAD
     COMMERCIAL SERVICE DATt
     MAXIMUM  BOILER  FLUE GAS  FLOW - CU.M/S
     FLUE  GAS TEMPERATURE  -  C
     STACK HEIGHT -  M
     STACK  TOP DIAMETER -  t»

 **  FUEL DATA
     FUEL TYPt
     FUEL GRADE
     AVERAGE  HEAT CONTENT  -  KJ/KG
     RANGE HEAT CONTENT -  BtU/LB
     AVERAGE  ASH CONTENT  - X
     RANGE ASH CONTENT  -  X
     AVERAGE  MOISTURE CONTENT - X
     RAN6E MOISTURE  CONTENT  - *
     AVERAGE  SULFUR  CONTENT  - X
     RANGE SULFUR CONTENT  - X
     AVERAGE CHLORIDE CONTENT -  X
     RANGE CHLORIDE  CONTENT  - X
     FUEL FIRING RATE - M  T/H
     FUEL FIRING RATE - KU

 ** ESP
     NUMBER

 ** MECHANICAL COLLECTOR
     NUMBER

 ** PARTICULATE  SCRUBBER
     NUMBER
     TYPE
     SUPPLIER
     NUMBER  OF  STAGES
     SHELL MATERIAL
     LINING  MATERIAL
     INTERNAL  MATERIAL
     BOILER  LOAD/SCRUBBER - X
     FLUE  GAS  CAPACITY  - CU.M/S
     FLUE  GAS  TEMPfftATUR£ - C
     L/G  RATIO - LITER/CU.M
     PRESSURE  DROP  - KPA
     SUPERFICIAL GAS VELOCITY -  M/S
     PARTICULATE IKLET  LOAD - 6/CU.r
     PARTICULATE OUTLET LOAD - G/CU.W
     PARTICIPATE DESIGN REMOVAL  EFFICIENCY
     S02  INLET CONCENTRATION - PPM
     SOJ  OUTLET  CONCENTRATION -  PPM
     SO2  DESIGN  REMOVAL EFFICIENCY - J£
PUBLIC SERVICE  OF  COLORADO
CHEROKEE
1
DENVER
COLORADO
******
    0.
******
  710.0
  115.0
  100.0
      .0
      .0
BABCOCK  R  UILCOX
PULVERIZED COAL
***** *
  0/57
<  .000 LB/MMBTU)
(****** LB/MMBTU)
********
*******
******
*******
 COAL
 BITUMINOUS
  23493.

    1J.50
 ******
    11.30
 ******
      .65
 ******
      .01
 ******
(******* ACFM)
(**** F)
(**** FT)
(***** FT)
< 10100 BTU/LB)
                 (*** TPH)
  1
 TCA
 UOP
     3
 CARBON
 RUBBER
 STAINLESS  STEEL
    67.0
   164. 4
   U6.1
     7.5
     3.2
     3.4
     1.8
       .0
    97.0
   500.000
   420.000
    16.0
 (  348400 ACFM)
 (   295 F)
 (56.0 GAL/IOOOACF)
 (    13 jN-H20>
 (    11.0 FT/S)
 (    .SO 6R/SCF)
 (   .020 GR/SCF)
                                                  367

-------
FPA UTILITY F6D SURVEY: DECEMBER  1978  - JANUARY 1979

                                            SECTION U
                DESIGN  AND  PERFORMANCE  DATA FOR OPERATIONAL PARTICIPATE  SCRUBBERS
 COMPANY NAME
 PLANT NAME
 UNIT NUMBER
 CITY
 STATE
 REGULATORY  CLASSIFICATION
 PARTKULATE  EMISSION  LIMITATION - NG/J
 S02  EMISSION  LIMITATION  -  N6/J
 NET  PLANT  GENERATING  CAPACITY - MW
 GROSS UNJT  GENERATING CAPACITY - MW
 NET  UNIT GENERATING  CAPACITY W/FGD - MW
 NET  UNIT GENERATING  CAPACITY WO/FGC - MW
 EQUIVALENT  SCRUBBED  CAPACITY - MW

 ** BOILER  DATA
      SUPPLIER
      TYPE
      SERVICE  LOAD
      COMMERCIAL  SERVICE  DATE
      MAXIMUM BOILER  FLUE  GAS FLOW - CU .M/S
      FLUE 6AS  TEMPERATURE  - C
      STACK  HE IGHT  -  M
      STACK  TOP DIAMETER  -  M

 **  FUEL tiATA
      FUEL TYPE
      FUEL GRADE
      AVERAGE HEAT  CONTENT  - KJ/KG
      RANGE  HEAT  CONTENT  -  BTU/LB
      AVERAGE ASH CONTENT - *
      RANGE  ASH CONTENT - X
      AVERAGE MOISTURE  CONTENT - X
      RANGE  MOISTURE  CONTENT - X
      AVERAGE SULFUR  CONTENT - X
      RANGE  SULFUR  CONTENT  - X
      AVERAGE CHLORIDE  CONTENT - X
      RANGE  CHLORIDE  CONTENT - Z
      FUEL  FIRING RATE  -  M  T/H
      FUEL FIRING RATE  -  MW
                    (  .000
                    (****** L.B/MMBTU)
PUBLIC SERVICE  OF  COLORADO
CHEROKEE
3
DENVER
COLORADO
* *****
    P.
******
  710.0
  170.0
  150.0
     .0
     .0
     BABCOCK 8  WILCOX
     PULVERIZED? COAL
      0/62
     ********
     *******
     ******
     * ******
     COAL
     BITUMINOUS
      23493.

        12.50
     ******
        11.30
     ******
          .65
     ******
          .01
     ******
     *******
     *****
                <*******  ACFMJ
                {****  I)
                (****  FT)
                <*****  FT)
                <  10100  BTU/LB)
                ******
                (***  TPH)
  ** ESP
      NUMBER


  ** MECHANICAL COLLECTOR
      NUMBER


  ** PARTICIPATE SCRUBBER
      NUMBER
      TYPE
      SUPPL1ER
      NUMBER OF STAGES
      SHELL MATERIAL
      LINING MATERIAL
      INTERNAL MATERIAL.
      BOILER LOAD/SCRUBBER - Z
      FLUE  GAS CAPACITY - CU .M/S
      FLUE  GAS TEMPERATURE - c
      L/C, RATIO - LITER/cU.M
      PRESSURE DROP - KPA
      SUPERFICIAL GAS VELOCITY - M/S
      PARTICULATE INLET LOAD - G/CU.fl
      PARTICULATE OUTLET LOAD - G/CU.M
      PARTICULATE DESIGN REMOVAL EFFICIENCY
      S02 INLET CONCENTRATION - PPM
      S02 OUTLET CONCENTRATION - PPM
      SO? DESIGN REMOVAL EFFICIENCY - X
- X
 2
TCA
UOP
    3
CARBON  STgpt
RUBBER
STAINLESS  STEEL
   20.0
   57.6
  137.8
    7.5
    3.2
    3.4
      .9
      .0
   95.0
  500-000
  420.000
   16.0
                    t 122000 ACFM)
                    <  280 F)
                    (56.0 GAL/1000ACF)
                    t   13 IN-H20)
                    C   11.0 fT/S)
                    (   .40 GR/SCF)
                    <  .020 6R/SCF>
                                                 368

-------
                                             EPA UTILITY F6D SURVEY:  DECEMBER 1978 - JANUARY  1979

                                           SECTION  14
              DESIGN  AND PERFORMANCE.  DATA FOR OPERATIONAL PARTICIPATE SCRUBBERS
COMPANY NAME
PLANT NAME
UNIT NUMBER
CITY
STATE
REGULATORY  CLASSIFICATION
PARTICULATE EMISSION  LIMITATION -  NG/J
S02 EMISSION  LIMITATION - NG/J
NET PLANT GENERATING  CAPACITY - Mtf
GROSS UNiT  GENERATING CAPACITY - MW
NET UNIT  GENERATING  CAPACITY W/FGD - MW
NET UNIT  GENERATING  CAPACITY WO/FGU - MJ
EQUIVALENT  SCRUBBED  CAPACITY - MU

**  BOILER  DATA
     SUPPLIER
     TYPE
     SERVICE LOAD
     COMMERCIAL  SERVICE DATE
     MAXIMUM BOILER FLUE GAS  FLOW  - CU.M/S
     FLUE  GAS TEMPERATURE - C
     STACK  HEIGHT  - K
     STACK  TOP  DIAMETER - M

 ** FUEL DATA
     FUEL TYPE
     FUEL GRADE
     AVERAGE HEAT  CONTENT - KJ/KG
     RANGE  HEAT  CONTENT - BTU/L6
     AVERAGE ASH CONTENT  -  X
     RANGE  ASH  CONTENT  -  X
     AVERAGE MOISTURE CONTENT - X
     RANGE  MOISTURE CONTENT - X
     AVERAGE  SULFUR CONTENT - X
     RANGE  SULFUR  CONTENT - X
     AVERAGE  CHLORIDE CONTENT - X
     RANGE  CHLORIDE CONTENT  - X
     FUEL FIRING RATE - M T/H
     FUEL FIRING RATE - MW

  ** ESP
     NUMBER

  ** MECHANICAL COLLECTOR
     NUMBER
                                                PUBLIC  SERVICE Of  COLORADO
                                                CHEROKEE
                                                4
                                                DENVER
                                                COLORADO
                                                     0.          <
                                                 ******          <«
                                                   710.0
                                                   175.0
                                                   350.0
                                                      .0
                                                      .0
                                                 COMBUSTION ENGINEERING
                                                 PULVERIZED COAL
                  •000 LB/MMBTU)
                 ***** LB/MMBTU)
                                                  0/68
                                                   717.29
                                                   135.0
                                                 COAL
                                                 BITUMINOUS
                                                  23493.

                                                    12.50
                                                 ******
                                                    11.30
                                                 ******
                                                       .65
               (1520000  ACFM)
               { 275  M
               {****  ft)
               (*****  FT)
                f  10100  BTU/LB)
                                                       .01
                                                 ******
                                                 * ******
                                                 * * ***
                (***  TPH)
** PARTICULATE SCRUBBER
    NUMBER
    TYPE
    SUPPLIER
    NUMBER OF  STAGES
    SHELL MATERIAL
    LINING MATERIAL
    INTERNAL MATERIAL
    L/6 RATIO  -  LITER/CU.M
    PRESSURE DROP  - KPA
    SUPERFICIAL  GAS VELOCITY  -  M/S
    PARTICULATE  INLET LOA&  -  G/cU.0
    PARTICULATE  OUTLET LOAD - G/CU.K
    PARTICULATE  DESIGN REMOVAL  EFFICIENCY
    S02 INLET  CONCENTRATION - PPM
    SOZ OUTLET CONCENTRATION  -  PPM
    S02 DESIGN REMOVAL EFFICIENCY - X
TCA
UOP
    •J
CARBON  ST£EI.
RUBBER
STAINLESS  STEEL
    7.5
    3.2
    3.4
    1.6
      .0
   97.0
   500.000
   420.000
   16.0
                                                                   (56.0 GAL/1000ACF)
                                                                       13  IN-H20)
                                                                       11.0  FT/S)
                                                                       .70 GR/SCF)
                                                                       .020
                                                 369

-------
'PA UTILITY  F6D SURVEY:  DECEMBER 197f -  JANUARY 1979

                                              SECTION U
                 DESIGN  AND  PERFORMANCE DATA  FOR OPERATIONAL PARTICIPATE  SCRUBBERS
          NAMl
 PLANT  NAKE
 UNIT NUMBER
 CITY
 STATE
 REGULATORY CLASSIFICATION
 PARTICULATE EMISSION  LIMITATION - NG/J
 S02  EMISSION LIMITATION - NG/J
 NET  PLANT GENERATING  CAPACITY - MW
 GROSS  UNIT GENERATING CAPACITY - WW
 NET  UNIT GENERATING  CAPACITY U/FGD -  "W
 NET  UNIT GENERATING  CAPACITY HO/F6D - MW
 EOUIVALENT SCRUBBED  CAPACITY - WW

 ** BOILER DATA
      SUPPLIER
      TYPE
      SERVICE LOAD
      COMMERCIAL  SERVICE DATE
      MAXIMUM BOILER  FLUE GAS FLOW - CU.ft/S
      FLUE GAS TEMPERATURE - C
      STACK HEIGHT  -  H
      STACK TOP  DIAMETER - M

  ** FUEL DATA
      FUEL TYPE
      FUEL GRADE
      AVERAGE HEAT  CONTENT - K J /KG
      RANGE HEAT  CONTENT - BTU/LB
      AVERAGE ASH CONTENT - *
      RANEE ASH  CONTENT - X
      AVERAGE MOISTURE CONTENT - t
      RANGE MOISTURE  CONTENT - X
      AVERAGE SULFUR  CONTENT - ?
      RANGE SULFUR  CONTENT - X
      AVERAGE CHLORIDE CONTENT - t
      RANGE CHLORIDE  CONTENT - X
      FUEL FIRING RATE - M T /H
      FUEL FIRING RATE - MW

  ** ESP
      TYpF
                <  .000
                (****** LB/KKBTU)
PUBLIC  SERVICE OF COLORADO
VALMONT
5
VALWONT
COLORADO
******
    0.
******
  273.8
  166.0
  166.0
      .0
      .0
******
PULVERIZED  COAL
BASE
 0/64
********        (*«***** ACFM)
*******         (**** F)
******          f**** FT)
*******         (***** FT)
COAL
SUREITUMINOUS
***** **
    5  20
*****
* ** **
*****
*****

*****
                (****** BTU/LB)
                 ******
                (***  TPH)
COLD  SIDE
  ** MECHANICAL  COLLECTOR

-------
                         APPENDIX A




FGD SYSTEM COST DATA:  OPERATIONAL AND NONOPERATIONAL SYSTEMS
                             A-l

-------
                          INTRODUCTION

     The cost of flue gas desulfurization (FGD) systems for the
control of sulfur dioxide emissions is an area of intense inter-
est and substantial controversy.  As a result, many computer
models have recently been developed to estimate capital and
annual costs.  As part of an effort by the U.S. Environmental
Protection Agency to provide meaningful economic data concerning
FGD systems, reported economic data have been incorporated into
the EPA Utility FGD Survey report.  This information has appeared
as a separate appendix of the report since October 1976.  Until
January 1978, this cost appendix consisted entirely of data
reported by the utilities with little or no interpretation pro-
vided by PEDCo Environmental, Inc.  Beginning with the May 1978
report, the format and content of the cost appendix were revised
to include reported and adjusted costs for the operational FGD
systems.
     The rationale for including adjusted as well as reported
costs stems primarily from the lack of comparability of the
reported costs.  Many of the reported cost figures, both capital
and operating, are largely site-sensitive values that cannot be
accurately compared because they refer to different FGD battery
limits and different years in which the expenditures were made.
As a result, an analysis of the cost data was made for the opera-
tional units since these systems offer the potential of having
complete and accurate economic data.  The adjustments were made
to provide comparable, accurate cost data for the sulfur dioxide
portion of the emission control system.  This, in effect, will
eliminate much of the confusion that exists concerning the re-
ported data, and it will provide a common basis for the reported
costs.

                               A-2

-------
                            APPROACH


     In March 1978, each utility having at  least one operational

FGD system was given a cost form containing all available cost
information then in the PEDCo files.  The utility was asked to

verify the data and fill in any missing information called for

on the form.  A follow-up visit by the PEDCo Environmental staff

was arranged to assist in data acquisition and to insure com-

pleteness and reliability of information.  Results of the cost

analysis were forwarded to each participating utility for final
review and comment.

     The cost data were treated solely to establish the accurate
costs for FGD systems, on a common basis, not to critique the

design or reasonableness of the costs reported by any utility.

Adjustments focused primarily on the following items:

     0    All capital costs were adjusted to July 1, 1977, dol-
          lars using the Chemical Engineering Index.  All capital
          costs, represented in dollars/kilowatt  ($/kW), were
          expressed in terms of gross megawatts  (MW).  Actual
          costs were reported by utilities in dollar values for
          years 1970 to 1980.  These values are represented in
          terms of the year of greatest capital expenditures.

     0    Gross unit capacity was used to express all FGD capital
          expenditures because the capital requirement of an FGD
          system is dependent on actual boiler size before de-
          rating for auxiliary and air quality control power
          requirements.

     0    Particulate control costs were deducted.  Since the
          purpose of the study was to estimate the incremental
          cost for sulfur dioxide control, particulate control
          costs were deducted using either data contained in the
          cost breakdowns or as a percentage of the total direct
          cost (capital and annual).  The percentage reduction
          varied depending upon system design and operation.
                               A-3

-------
The capital costs associated with the modification or
installation of equipment not part of the FGD system
but needed for its proper functioning, were included
(e.g. - stack lining, modification to existing ductwork
or fans, etc.).

Indirect charges were adjusted to provide adequate
funds for engineering, field expenses, legal expenses,
insurance, interest during construction, allowance for
startup, taxes, and contingency.

All annual costs, represented in mills/kilowatt-hour
(mills/kWh), were expressed in terms of net megawatts
(MW) .

Net unit capacity was used to express all FGD annual
expenditures because the annual cost requirement of an
FGD system is dependent on the actual amount of kilo-
watt-hours (kWh) produced by the unit after derating
for auxiliary and air quality control power require-
ments.

All annual costs were adjusted to a common capacity
factor  (65%).

Replacement power costs were not included since only a
few utilities reported such costs and these were pre-
sented using a variety of methods.

Sludge disposal costs were adjusted to reflect the
costs of sulfur dioxide waste disposal only (i.e.,
excluding fly ash disposal) and to provide for disposal
over the anticipated lifetime of the FGD system.  This
latter correction was necessary since several utilities
reported costs for sludge disposal capacity that would
last only a fraction of the FGD system life.  The
adjustments were based on a land cost of $2000/acre
with a sludge depth of 50 ft in a clay-lined pond  (clay
is assumed to be available at the site).

A 30-year life was assumed for all process and economic
considerations for all new systems that were installed
for the life of the unit.  A 20-year life was assumed
for all process and economic considerations for retro-
                     A-4

-------
          fit systems that were installed for the remaining por-
          tion of the life of the unit.*

     0     Regeneration and by-product recovery facility costs
          were added for those regenerable systems not reporting
          such costs.

     To the extent possible, all cost adjustments were made using

the previous assumptions developed by PEDCo Environmental.   When

cost data were inadequate, adjustments were made using process

design data in conjunction with the previous cost assumptions.

In some cases, no adjustments were possible because of in-

sufficient data.
 *  The use  of  a  30-year service life for new units  coincides with
   the conclusion  of  the National Power Survey of the  Federal
   Power Commission which recognized this value as  reasonable  for
   steam-electric  plants.   A 20-year service life was  assumed  for
   all retrofit  units even if the remaining life of the units  is
   less than this  value.  Thus, two different rates are used and
   should be noted when making comparisons between  new and retro-
   fit systems.
                                A-5

-------
                  DESCRIPTION OF  COST  ELEMENTS

     Capital costs consist of direct costs,  indirect  costs,  con-
tingency costs,  and other  capital costs.   Direct  costs  include
the "bought-out" cost of the equipment,  the  cost  of installation,
and site development.  Indirect costs  include interest  during
construction, contractor's fees and expenses, engineering,  legal
expenses, taxes, insurance, allowance  for  start-up and  shake-
down, and spares.  Contingency costs include those costs  result-
ing from malfunctions, equipment  alterations, and similar un-
foreseen sources.  Other capital  costs include  the nondepreciable
items of land and working  capital.
     Annual costs consist  of direct costs, fixed  costs, and over-
head costs.  Direct costs  include the  cost of raw materials,
utilities, operating labor and supervision,  and maintenance and
repairs.  Fixed  costs include those of depreciation,  interim
replacement, insurance, taxes, and interest  on  borrowed capital.
Overhead costs include those of plant  and  payroll expenses.   The
various capital  and annual cost components are  discussed  and
defined in greater detail  in the  following paragraphs.
     The direct  capital costs include  the  following elements:
     °    Equipment required for  the FGD system.  Table A-l
          provides a summary of the major  process equipment used
          in regenerable and nonregenerable  systems.
     °    Installation of  equipment, including  foundations;  steel
          work for support, buildings, piping and ducting for
          effluents, slurries, sludge, and make-up water, control
          panels, instrumentation, insulation of  ducting, buildings,
          piping, and other equipment, painting and piling.
     0    Site development may include clearing and grading,
          construction of  access  roads and walkways,  establish-
          ment of rail, barge, and/or  truck  facilities, and
          parking facilities.
                                A-6

-------
         TABLE A-l.  MAJOR FGD  SYSTEM EQUIPMENT SUMMARY
    Category
             Description
Material handling-
raw materials
Peed preparation-
raw materials
 Sulfur dioxide
 absorption
 Flue  gas  reheat
 Gas handling
 Sludge disposal
 Utilities
 By-product
 handling
Equipment for the handling and transfer of
raw materials includes unloading facilities,
conveyors, storage areas and silos, vibrators,
atmospheric emission control associated with
these facilities, and related accessories.

Equipment for the preparation of raw material
to produce a feed slurry consists of feed
weighers, crushers, grinders, classifiers,
ball mills, mixing tanks, pumps, agitators,
and related accessories.

Equipment for treating the flue gas includes
absorbers, mist eliminators, hold tanks,
agitators, circulating pumps, pond water re-
turn pumps, and related accessories.

Equipment required includes  air, steam, or
hot water heaters, condensate tanks, pumps,
soot blowers, fans, fuel storage facilities,
gas bypass equipment, and related accessories.

Equipment to handle the boiler  flue gas in-
cludes  booster  fans,  ductwork,  flue gas by-
pass system, turning  vanes,  supports, plat-
forms,  and related accessories,

Nonregenerable  FGD systems  require  solids/
water  separation  equipment  such as  clarifiers,
vacuum filters,  centrifuges, sludge fixation
equipment, and  related  accessories.

Equipment to  supply power  and water to  the
FGD  equipment  consists  of  switch-gear,  break-
ers,  transformers, piping,  and  related
accessories.

Equipment for  processing the by-product of
regenerable  FGD systems may include a rotary
kiln,  fluid  bed dryer,  conveyor, storage silo,
vibrator,  combustion  equipment  and oil  stor-
age  tanks,  waste heat boilers,  hammer mills,
evaporators,  crystallizers, strippers,  tanks,
agitators,  pumps, compressors,  sulfuric acid
absorber and cSoling, mist eliminator,  pumps,
acid coolers,  tanks,  etc.
  (continued)
                                A-7

-------
TABLE A-l.  (continued)
    Category
             Description
Regeneration
Purge treatment
Auxiliary
Equipment for regeneration of  the  absorbing
medium of an FGD system may consist of re-
actor vessels, material handling system,
storage, weigh feeder, conveyor, rotary kiln,
fluid bed calciner, dust collector, storage
silo, vibrator, combustion equipment and oil
storage tanks, waste heat boiler,  hammer
mill, evaporators, crystallizers,  strippers,
tanks, agitators, pumps, compressors, sul-
furic acid absorber and cooling, mist elimi-
nator, pumps, acid coolers, tanks, etc.

Equipment for the removal of purge material
(e.g. sodium sulfate) includes refrigeration,
pumps, tanks, crystallizer, centrifuge,
dryer, dust collector, conveyors,  storage,
and related equipment.

Equipment not directly related to  the
FGD system, but which may require  design or
modification to accommodate an FGD system
may include such items as existing fans,
ducts, or stack.   If new fans,  ducts,  or
stacks are added to improve boiler perfor-
mance and accommodate the FGD systen,  the
costs are prorated to the boiler and FGD
system.
                              A-8

-------
Indirect capital costs include the following elements:

°    Interest accrued on borrowed capital during construction,

°    Contractor's fee and expenses, including costs for
     field labor payroll; field office supervision; person-
     nel; construction offices; temporary roadways; railroad
     trackage; maintenance and welding shops; parking lot;
     communications; temporary piping and electrical and
     sanitary facilities; safety security  (fire, material,
     medical, etc.); construction tools and rental equip-
     ment; unloading and storage of materials; travel ex-
     penses; permits; licenses; taxes; insurance; overhead;
     legal liabilities; field testing of equipment; start-
     up; and labor relations.

0    Engineering costs, including administrative, process,
     project, and general; design and related functions for
     specifications; bid analysis; special studies; cost
     analysis; accounting; reports; consultant fees; pur-
     chasing; procurement; travel expenses; living expenses?
     expediting; inspection; safety; communications; model-
     ing; pilot plant studies  (if required because of pro-
     cess design or application novelty); royalty payments
     during construction; training of plant personnel; field
     engineering; safety engineering; and consultant ser-
     vices.

0    Legal.expenses, including those for securing permits,
     rights-of-way, etc.

°    Taxes, including sales, arid excise taxes.

°    Insurance covering liability for equipment in transit
     and at site; fire, casualty, injury, and death; damage
     to property; delay; and noncompliance.

°    Allowance for start-up and shakedown includes the cost
     associated with system start-up.

°    Spare parts including pumps, valves, controls, special
     piping and fittings, instruments, spray nozzles, and
     similar items.

Other capital costs include the following elements:

°    Land required for the FGD process, waste disposal, re-
     generation facility, and storage.

*    Working capital, including the total amount of money
     invested in raw materials and supplies in stock,
     finished products in stock, and unfinished products

                          A-9

-------
          in the process  of  being  manufactured;  accounts re-
          ceivable;  cash  kept on hand for payment of operating
          expenses such as salaries,  wages,  and  raw materials
          purchases;  accounts payable;  and taxes payable.

     Annual cost of  an FGD system  includes the following direct,

fixed and overhead charges:

°    D i r e c t C ha r g e s

          Raw materials,  including those  required by the FGD
          process for sulfur dioxide  control,  absorbent regenera-
          tion, sludge treatment,  sludge  fixation,  flocculants,
          etc.

          Utilities,  including water  for  slurries,  cooling and
          cleaning;  electricity for pumps,  fans,  valves, lighting
          controls,  conveyors, and mixers;  fuel  for reheating of
          flue gases; and stream for  processing.

          Operating  labor, including  supervisory,  skilled, and
          unskilled  labor required to operate, monitor, and
          control the FGD process.

          Maintenance and repairs, consisting  of both manpower
          and materials to keep the unit  operating efficiently.
          The function of maintenance is  both  preventive and
          corrective to keep outages  to a minimum.

          Byproduct Sales;  credit from the  sale of byproducts
          regenerable FGD processes (e.g.  sulfur,  sulfuric acid)
          is a negative charge deducted from the annual direct
          cost to obtain  the net annual direct cost of the FGD
          system.

°    Fixed Charges

          Depreciation -  the annual charge to  recover direct and
          indirect costs  of  physical  assets  over the life of the
          asset.

          Interim, replacement - costs expended  for temporary or
          provisional replacement  of  equipment that has failed or
          malfunctioned prematurely.

          Insurance,  including the costs  of  protection from loss
          by a specified  contingency, peril, or  unforeseen event.
          Required coverage  could  include losses due to fire,
          personal injury or death, property damage, explosion,
          lightning,  or other natural phenomena.
                               A-10

-------
     •     Taxes/  including franchise,  excise,  and property taxes
          levied  by a city, county,  state,  or  Federal government.

          Interest on borrowed funds.

°    Overhead

          Plant and administrative overhead is a business expense
          that is not charged directly to a particular part of a
          project, but is allocated to it.   Overhead costs in-
          clude administrative, safety, engineering, legal and
          medical services; payroll;  employee  benefits; recrea-
          tion; and public relations.

     Table A-2 provides a summary of the means used to determine

the missing cost elements if th© costs were not reported or
insufficient information prevented their actual determination.

The assumptions and cost bases for determining the capital and
annual costs of FGD systems were developed by  the PEDCo staff
based upon previous economic studies conducted for the U.S. EPA
 (Flue Gas Desulfurization Process Cost Assessment, May 1975;

Simplified Procedures for Estimating Flue Gas  Desulfurization

System Costs, June 1976, EPA-600/2-76-150;  Particulate and Sulfur
Dioxide Emission Control Costs for Large Coal-Fired Boilers,

March 1978, EPA-600/7-78-032) .
                               A-ll

-------
                TABLE A-2.  COST ELEMENT FACTORS
     Category
               Value
Indirect capital costs:
  Interest during
    construction
  Field overhead
  Contractor's fee and
    expenses
  Engineering
  Taxes
  Spares
  Shakedown allowance
Other capital costs:
  Contingency

Direct annual costs:
  Raw materials:
    Fixation chemicals
    Lime
    Limestone
    Magnesium oxide
    Sodium carbonate
    Salt cake (credit)
    Sulfur (credit)
    Sulfuric acid  (credit)
  Utilities:
    Electricity
    Water
    Steam
  Operating labor:
    Direct labor
    Supervision
10% of total direct capital costs

10% of total direct capital costs
 5% of total direct capital costs

10% of total direct capital costs
 2% of total direct capital costs
 1% of total direct capital costs
 5% of total direct capital costs
20% of total direct and indirect
  capital costs
             $2/ton
             $40/ton
             $10/ton
             $150/ton
             $80/ton
             $50/ton
             $65/ton
             $25/ton

          25 mills/kWh
          $0.20/103 gal
          $0.80/106 Btu

$8.50/man-hour
15% of direct labor costs
  Contingency costs are used only when the cost data supplied are
  incomplete (such as equipment costs or direct costs only) and a
  contingency cost must be factored in to give an accurate estimate
  of the total capital cost.
(continued)
   A-12

-------
TABLE A-2.  (continued)
     Category
               Value
  Maintenance:
    Labor and materials
    Supplies
  Overhead:
    Plant
    Payroll

Fixed annual costs:
  Depreciation
  Interim replacement
  Taxes
  Insurance
  Capital costs
 4% of total direct capital costs
15% of labor and materials costs

50% of operation and maintenance costs
20% of operating labor costs


3.33% or 5% (new or retrofit)
0.7% or 0.35%
4%
0.3%
9%
   Some system components have life spans less than the expected
   service  life of the system.   Interim replacement is an allow-
   ance factor used in estimating annual revenue requirements to
   provide  for the replacement of these short-lived items.  An
   average  allowance of  0.35% of the total  investment is normally
   provided and used for systems with an expected service life of
   20 years or less.  A  higher allowance of 0.70% of the total
   investment is provided and used for systems with an expected
   service  life of 30 years or more.
                              A-13

-------
                   DEFINITION OF COST ELEMENTS

     The costs displayed in Appendix A are accompanied by a
series of alphabetic characters summarizing data presented for
each FGD system.   These relate to the cost elements described
earlier in this section and identify what has been included and
excluded for reported and adjusted capital and annual costs.  The
alphabetic characters, along with their titles, are briefly de-
scribed in Table A-3.
                              A-14

-------
                      TABLE  A-3.    DESCRIPTION OF COST
Code
                Title
          Description
 L


 M



 N


 0
      articulate control (required for FGD pro-
      ess) included in capital cost.
     Particulate control (included in FGD
     process) included in capital cost.
     Total direct capital costs included.
     Partial direct capital costs included.
     Total indirect capital costs included.
     Partial indirect costs included.
     Chemical  fixation of  sludge included in
     capital cost.
      Dry  sludge  disposal  included  in capital
      0081.
      Off-site landfill area included  in
      capital coat.

      Sludge pond included in capital  cost.
      Additional sludge disposal capacity
      added for life of system.
Stack included in capital cost.

Modifications to stack, ducts, and/or
fans included in capital cost.

Total regeneration facility cost included
in capital cost.
Partial regeneration facility cost in-
cluded in capital cost.

R & D costs included in capital cost.
Particulate precollection device (ESP,
fabric filter, venturi)  prior to FGD
system required for proper operation of
SO, control system.

Particulate collection equipment (venturi
scrubber) is included in the FGD system.

Complete cost of all FGD equipment,  the
labor and materials required for equip-
ment installation, and interconnecting
the system is included in the total
capital cost.

One or a number of direct cost items, or
the cost associated with one or a number
of direct cost items, are excluded from
the total capital cost.

Complete cost of all the indirect cost
elements, including interest during  con-
struction, contractor's fees, engineer-
ing, legal expenses, taxes, insurance,
allowance for start-up,  and spares,  is
included in total capital cost.

One or a number of indirect cost items,
or the cost associated with one or a
number of indirect cost items, are ex-
cluded from the total capital cost.
The cost of a chemical fixation process
which stabilizes the flue gas cleaning
wastes prior to disposal is included in
the total capital cost.

The cost of a secondary dewatering or
treatment method, such as filtration, cen-
trifugation, or forced oxidation, which
ultimately produces a dry sludge cake
for final disposal, is included in the
total capital cost.
The cost of an off-site area used as a
landfill for flue gas cleaning wastes is
included in the total capital cost.
The cost of an on-site disposal area for
ponding of treated or untreated flue gas
cleaning wastes is included in the total
capital cost.
The cost of additional SO. waste disposal
capacity required for FGD system operation
over the anticipated service life of the
unit is included in the total capital cost.

The cost of the stack is included in the
total capital cost.

Modifications to existing equipment  (stack,
fans, ducts, etc.) which are required be-
cause of inclusion of an FGD system.
Complete cost of entire regeneration
facility included in total capital cost.

Part of the cost associated with the re-r
generation facility included in the total
capital cost.

Bench scale or pilot plant studies to  de-
termine process and design characteristics.
  (continued)
                                     A-15

-------
                           TABLE A-3.   (continued)
Code
                Title
           Description
W


X
     Costs underwritten by system supplier in-
     cluded in capital cost.
     Excess reagent supply costs included in
     capital cost.

     Total direct annual costs included.
     Partial direct annual costs included.
     Total fixed annual costs included.
     Partial fixed annual costs included.
Overhead cost included in  total  annual
cost.
Particulate control costs  included in
direct annual cost.
     Sludge disposal service costs (contract)
     included in direct annual cost.

     Replacement energy costs included in
     total annual costs.
Capital expenditures underwritten by the
system supplier for system repairs or
modifications for optimization of perfor-
mance or R 6 D programs.
Capital expenditures for reagent supply
exceeds the amount required for the period
of initial operation.
Complete cost of all raw materials,
utilities, operating labor and maintenance
and repairs is included in the total
annual cost.
One or a number of direct annual cost items,
or the cost associated with one or a number
of direct annual cost items, are excluded
from the total annual cost.

Complete cost of all fixed cost elements,
including depreciation, interim replace-
ment, insurance, taxes, and interest, is
included in the total annual cost.
One or a number of fixed annual cost items,
or the cost associated with one or a
number of fixed annual cost items, are ex-
cluded from the total annual cost.
Plant and payroll overhead costs are in-
cluded in the total annual cost.
The cost of operating particulate collection
equipment included in the FGD system is in-
cluded in the total annual cost.

The treatment and disposal of flue gas
cleaning wastes that are handled by an
outside firm.

The cost of additional power-generating
capacity required to compensate for power
used by the FGD system.
                                          A-16

-------
                    RESULTS OF COST ANALYSIS

     The results of the operational FGD system survey are summarized
in Table A-4 and Section A-l.  Table A-4 produces a summary of a
categorical analysis of the reported and adjusted .capital and
annual costs for the operational FGD systems addressed in the
survey.  Included in this categorical analysis are the ranges,
means, and standard deviation for all the various types and
categories of FGD systems examined.  Section A-l summarizes the
reported and adjusted capital and annual costs for all the oper-
ational FGD systems addressed in the survey (Section A-2 summarizes
available cost data for nonoperational FGD systems).
     In an attempt to further clarify and allow additional compar-
ison of costs between different FGD units, the adjusted fixed
annual costs were standardized.  This was done by taking the
adjusted Total Direct and Indirect Capital Costs for each unit
and applying the identical rate for costs of depreciation, interim
replacement, taxes, insurance and capital.  These new sums were
totaled, then added to the adjusted Variable Cost to determine
the Total Standardized Annual Costs.  In this manner costs can be
compared based upon the assumption that Utilities can incur Fixed
Annual Costs at the same rate.
                              A-17

-------
                       TABLE A-4,  CATEGORICAL  RESULTS OF THE REPORTED  AND ADJUSTED

                             CAPITAL AND  ANNUAL  COSTS FOR OPERATIONAL PGD  SYSTEMS
       CATEGORY
                                	REPORTED—	
                                —CAPITAL,  «/K«—	-ANNUAL, MILLS/KttH	
                                 RANGE    AVG   DEV      RANGE     AV6   DEV
                                                 	ADJUSTED	
                                                 	CAPITAL, */«!	  	ANNUAL, NILLS/KUH—
                                                    RANEE     AVG   DEV      RANGE     AVG   DEV
oa
ALL

NEU

RETROFIT

THROUAUAT PRODUCT

SALEABLE PRODUCT

LIMESTONE

LINE

LINE/ALKALINE  FLYASH

SODIUN CARBONATE

UELLNAN LORD

LIMESTONE/ALKALINE FLYASH

MAGNESIUM OXIDE
                                                                .3-  14.9   6.3

                                                                .3-  14.3   4.4

                                                               2.1-14.9   8.3

                                                                .3-  14.3   5.9
  5.3-156.9   77.0  34.9

  5.3-120.6   71.4  30.0

 29.2-156.9   83.7  42.7

  5.3-120.6   67.1  29.2

 93.3-156.9  132.5  23.5    3.3- 14.9   9.1

  5.3- 99.5   61.4  27.6    1.6-  3.3   2.2

 29.2-120.6   74.1  29.7     .3- 14.3   9.0

 85.9- BS.9   85.9    .0  *****-   .0     .0

 42.9-113.6   66.5  33.3    2.1-  2.1   2.!

127.9-156.9  137.6  13.7   14.9- 14.9   14.7

 47.9- 47.9   47.9    .0    2.0-  2.0   2.0

156.7-156.7  156.7    .0  »**«*-   .0     .0
5.1

5.0

4.4

4.9

5.8

 .8

4.S

 .0

 .0

 .0

 .0

 .0
 60.9-233.2  94.2  35.2    2.7-  12.4   5.5   2.4

 66.4-117.6  85.5  16.9    2.8-   8.7   5.2   2.0

 60.9-233.2 103.6  45.8    2.7-  12.4   5.8   2.6

 60.9-140.6  87.0  21.2    2.7-   8.7   5.2   1.9

134.8-233.2 184.0  49.2   12.4-  12.4   12.4     .0

 66.4-117.6  93.1  21.9    2.9-   6.6   5.0   1.4

 47.5-140.4  88.9  21.1    2.7-   8.7   6.0   2.0

 93.0- 93.«  93.0    .0    5.2-   5.2   5.2     .0

 60.9-107.?  74.4  22.2    3.2-   4.4   3.6     .6

134.8-134.8 134.8    .0   12.4- 12.4   12.4     .0

 71.5-71.5  71.5    .0    2.8-  2.8   2.8     .0
233.2-233.2 233.2
                                                                                                          .0  *****-   .0    .0     .0

-------
                                             EPA UTILITY F60 SURVEY: DECEMBER  1978  -  JANUARY  1979
                                           SECTION A-1
                                COSTS FOR OPERATIONAL F6D SYSTEMS

UNIT DESCRIPTION
ALABAMA ELECTRIC COOP
TOH6I6BEE
179.0 MW (NET)
ARIZONA ELECTRIC POWER COOP
APACHE
2
180.0 MW (NET)
CENTRAL ILLINOIS LIGHT
DUCK CREEK
1
416.0 MW (NET)

COST DESCRIPTION
CAPACITY FACTOR, X
TOTAL CAPITAL, $/KW(YE*R)
TOTAL ANNUAL, MILLS /KWH (YEAR )
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, S/KW(YEAR)
TOTAL ANNUAL, Mlu.S/KWH(tE AR)
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, $/KW(YfAR)
TOTAL ANNUAL, MILLS /KWH ( YiAR)
COST ELEMENTS

REPORTED ADJUSTED !
0 65
69.5(1978) .Q< 0>
.0( 0) «0( 0)
C,E,J
0 65
5.3(1978) ,0( 0)
,0< 0) .0( 0)
BfC
0 65
93.3C197B) ,0( 0)
3.3( 0) .0( 0)
C,E,J,M

STANDARDIZED
ADJUSTED
65
,0( 0)
.0( 0)
65
.0« 0)
.0( Q)
65
.OC 0)
.0< 0)
COLUMBUS 8 SOUTHERN OHIO ELEC. CAPACITY FACTOR, X
CONESVILLE
II
 411.0 MW (NET)
TOTAL CAPITAL, S/KWtYFAR)
TOTAL ANNUAL, "ILLS/KWH(YEAR)
COST ELEMENTS
  51           65           65
  55.5(1975)   70,7(1975)   ?Q,7(1975)
   4,7(   0)    7.4<   0)    7,4(   0)
B,C,Ji«,T,K, C»E«J»M,S,U» C,F,J,»,S,U,
Y            W,Y          W,Y
COLUMBUS (t SOUTHERN OHIO ELEC. CAPACITY  FACTOR, X
CONESVILLE
f
 411.0 MW (NET)
TOTAL CAPITAL, »/KW(Y6AR)
TOTAL ANNUAL, WILLS/KWH(YEAR)
COST ELEMENTS
   0           65
  55.5(1978)   70.7(1978)
    .0(   0)     ,0(   0)
B,C,J,I%T,X, C,E,J,PI,S,U,
Y            W,Y
                                                                                           65
                                                                                             ,0(
0)
C)
OUQUESN6 LI6HT
FLRAMA
1-4
 510.0 «W (NFT)
CAPACITY FACTOR, X
TOTAL CAPITAL, S/KW(YEAR>
TOTAL ANNUAL, PILLS/KWH(YEAR)
COST ELEMENTS
  64           65           65
 113.4(1976)  127.1C   0)  127.1(1976)
   8.6(   0)    7.8<   0)    7.5(   0)
B,D,F,I,J,n, C,E,1,J,M,S, C,E,I,J,M,S,
T,V,X,Y      U,Y          U,V
DUBUESNE LI6HT
1-6
 410.0 MU (NET)
CAPACITY FACTOR, x
TOTAL CAPITAL* »/KW(YEA*>
TOTAL ANNUAL, MILLS/KWH(YEAP)
COST ELEMENTS
  70           65           65
 106.9(197?)  140.6(1972)  140.6C197?)
   7.8(   0)    8.6(   0)    6.21   0)
B,D,F,I,J,K, C,Eil,J,«,S, C,E,I,J,M,S,
T,V,X,Y      U,Y          U,Y
INDIANAPOLIS POWER k LI6HT
PETERSBURG
5
 53Z.O MW  (NET)
CAPACITY FACTOR, X                 0            65           65
TOTAL CAPITAL, S/KW(YEAR)        99.5(1976)  100.6(1976)  100.6(1976)
TOTAL ANNUAL, MILLS/KWH(YEAR)       .0(   0)     6.6(    0)     7.4(    0)
COST ELEMENTS                   C.F,G,J,M     C,E,G,J,M,S, C,E,G,J,M,S,
                                             U,W,Y        U,W,Y
KANSAS CITY POWER  K LIGHT
HAWTHORN
5
 110.0 MW (NET)
CAPACITY FACTOR, X                14
TOTAL CAPITAL, S/KW(YEAR)         29.2(1972)
TOTAL ANNUAL, MILLS/KWH(YEAR)      E.4(    0)
COST ELEMENTS                   B,D,F,T,X
               65           65
               87.Z(1972)   87.2(1972)
                4.7(   0)     4.4(    0)
             B,C,E,J,K,S, B,C,E,J,K,$,
             U,W,X        U.W.X
KANSAS CITY POWER  &  LIGHT
HAWTHORN
I
 110.0 MW  (NET)
CAPACITY FACTOR, x                 o
TOTAL CAPITAL,  $/KW(YEAR>         29.2(1972)
TOTAL ANNUAL, KILLS/KWH(YEAR)      £.4(    0)
COST ELEMENTS                   8,D,F,T,X
                65            65
                87.2(1972)    87.2(197?)
                4.7(    0)     4.4(    0)
             6,C,E,J,K,S, B,C,E,J,K,S,
             U.W.X        U,W,X
                          ******   INDICATES COST FIGURES NOT YET AVAILABLE

                                             A-  19

-------
FPA UT1LITT
               SURVEY:  DECEHE-ER  T>7F  - JANUARY "79
                                           SECTION A-1
                                COSTS FOR  OPERATIONAL FGD SYSTEMS

UNIT DESCRIPTION
KANSAS CITY POWER * LIGHT
LA CYCNE
874.0 HW (NET)
rENTUCKY UTILITIES
GREEN RIVER
1-3
64.0 NW (NET)
LOUISVILLE «AS & £LECTRlC
fANE RUN
4
19Q.O HW (NET)
LOUISVILLE CAS & ELECTRIC
CANE RUN
5
200.0 MW (NET)
LOUISVILLE CAS g ELECTRIC
PADDY'S RUN
I-
70.0 HW (NET)

COST DESCRIPTION
CAPACITY FACTOR, X
TOTAL CAPITAL, J/KW(YEAR>
TOTAL ANNUAL, HILL S /KWH ( YE AR )
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, S/KW(YEAR)
TOTAL ANNUAL, HILLS /KWH ( YE AR)
COST ELEHENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, $/KW(YfAR>
TOTAL ANNUAL, KILLS /KWH( YE AR)
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, */KU(YEAR)
TOTAL ANNUAL, MILLS /KWH( YEAR)
COST ELEMENTS
CAPACITY FACTOR, x
TOTAL CAPITAL, S/KW(YEAR)
TOTAL ANNUAL, HILLS /KVH(VEAR >
COST ELEMENTS

REPORTED
30
53.6(1972)
1.7( 0)
B.C.E.J.S
16
70.3(1975)
14. 3( 0)
B.C,E,J,S,U,
W
55
66.5(1975)
.0( 0)
C,E,H,J,8,T
0
63.4(1977)
,0( 0)
C,E,H,J
0
52.8(1973)
.o( n>
C,E

ADJUSTED
65
66.0(1972)
3.P( 0)
C,E,J,K,S,U
65
77.5(1975)
2.7( 0)
C,E,J,S,U,W
65
80.6(1975)
5.R( 0)
C,E,H,J,K,Q,
S.U.W
65
67.5(1977)
5.6C 0)
C,E,H,J,K,S,
65
76.4(1973)
6.5( 0)
C,E,S,U,W

STANDARDIZED
ADJUSTED
65
68.0(1972)
C,E,J,K,S,U
65
77.5(1975)
5.2( 0)
C,E,J,S,U,V
65
fO. 6(1975)
6.2( 0)
C,F,H,J,K,Q,
S.U.W
65
67.5*1977)
5.6< 0)
C,E,H,J,K,S,
u,w
65
76.4(1973)
6.4( 0)
C.E .S.U.W
•IWNKOTA POWER COOPERATIVE
HILTON 0. VOUN6
?
 405.0 HW (NET)
                                CAPACITY FACTOR, *
                                TOTAL CAPITAL, S/KU(YEAR>
                                TOTAL ANNUAL, HILLS /KWH (YE AR)
                                COST ELEHENTS
   0           65           65
  85.9(1976)   93.0(1976)   93.0(    0)
    .0(   D>    5.2(   Q)     5.2(    0)
C,E,H,P      C,E,H,K,P,S, C.E.H.f.P.S.
             U,W          U.V
•ONTANA POWER

1
 360.0 HW (NET)
                                CAPACITY FACTOR, x
                                TOTAL CAPITAL,- S/KW(YE*R)
                                TOTAL ANNUAL, HILLS/KWH(YEAR)
                                COST ELEMENTS
  76           65            65
  77-U1975)   77iZ(t975)    77.2'1?7S>
    .0(   0)    4.1(   0)     4.0C    0)
8,C,E,j,P,T  C,E,J,K*P,S, C,E,J,K,P,S,
             u,w          u,w
MONTANA POWER
COLSTRIP
a
 360.0 MW (NET)
                                CAPACITY FACTOR, x
                                TOTAL CAPITAL, $/KW(VEAR)
                                TOTAL ANNUAL, KILLS /KUH (YE A R >
                                COST ELEHENTS
  76           65            65
  77.1(1975)   77.2(1975)    77.2<1975)
    .3(   0)    4.K    0)     4.1(    0)
e,C,E,J,P,T  C,E,J,K,P,S, C,E,J,K,P,S,
             U,W          U,W
NEVADA POWER
PEID 6ARDNER
1
 125.0 MW (NET)
                                CAPACITY FACTOR, x
                                TOTAL CAPITAL, S/KW(YEAR>
                                TOTAL ANNUAL, HILLS/KWH(YEAR)
                                COST ELEMENTS
  67           65            65
  42.9(1973)   60.9(1973)    60.9(1973)
   2.1(   D>    3.2(    0>     3.4(    0)
B,D,E,P,S,U, B,D,E,P,S,U, B,D,E,P,S,U,
w,x          u,x          w,x
NEVADA POWER
REID 6ARDNER
c
 125.0 HW (NET)
                                CAPACITY FACTOR, x
                                TOTAL CAPITAL, t/KW(YEAR)
                                TOTAL ANNUAL, HItLS/KWH(YEAR)
                                COST ELEMENTS
  67            65            65
  42.9(1973)    60.9C1973)    60.9(1973)
   2.1(   0>    3.2(    0>     3.4f   0)
8,0,E,P,S,U, B,6,E,P,S,U,  B,D,E,P,S,U,
w.x          w,x           u,x
                         ******   INDICATES COST  FIGURES  NOT  VET AVAILABLE

                                            A-  20

-------
                                              EPA  UTILITY FED SURVEY: DECEMBER  1978  - JANUARY 1979
                                             SECTION  A-1
                                 COSTS FOR  OPERATIONAL  F6D SYSTEMS
UNIT DESCRIPTION
                                COST DESCRIPTION
                                 	COST	
                                  REPORTED     ADJUSTED    STANDARDIZED
                                                             ADJUSTED
NEVADA POWER
REID GARDNER
5
 125.0 MW  (NET)
CAPACITY FACTOR! X
TOTAL CAPITAL, $/KW(Y£AR)
TOTAL ANNUAL, HILLS/KVB
TOTAL ANNUAL, WILLS/KWH(YEAR)
COST ELEMENTS
  77           65            65
 156.9(1976)  134.8(1976)   134.8(1976)
  14.9(   0)   12.4(    0)    11.01    0)
B,C,E,L,N,S, C,E,L,N,S,U»  C,E,L.N,S,U,
u,w,x,z      w,z           w,z
NORTHERN  STATES POWER
SHERBURNE
1
  720.0  MW  (NET)
CAPACITY FACTOR,  x
TOTAL CAPITAL,  $/KW(YEAP.)
TOTAL ANNUAL, MILLS/KWH(YEAR)
COST ELEMENTS
  73           65            65
  47.9(197?)   71.5(1972)    71.5*1972)
   2.Of   0)    2.?(    0)     3.3(    0)
B,C,J,S,U,X, C,E,J,K,S,U,  C,E,J,K,S,U,
 NORTHERN  STATES POWER
 SHERBURNE
 ?
  720.0 HW (NET)
CAPACITY  FACTOR,  x
TOTAL CAPITAL,  $/KU(YEAR)
TOTAL ANNUAL, MILLS/KWH (YE AR >
COST ELEMENTS
  73           65            65
  47.9(1972)   71.5(1972)    71.5(1972)
   2.0(   0)     2.P(    0)     3.3(    0)
B,C,J,S,U,X, C,E,J,K,S,U,  C,E,J,K,S,U,
z            u             w
 PENNSYLVANIA POWER
 BRUCE  MANSFIELD
 1
  917.0 MW (NET)
CAPACITY  FACTOR,  x
TOTAL  CAPITAL,  S/KUCYEAR)
TOTAL  ANNUAL,  MILLS/KVH (YE AR)
COST ELEMENTS
  40            65            65
 120.6(1975)   102.1(1975)   102.1(1975)
  14.3(   0)    8.7(    0)    10. H    0)
B,C,E,S,I,Lt C,E,G,I,M,S,  C ,E ,6 ,1 ,W , S ,
S,U,W,X      U,W           U,V
 PENNSYLVANIA POWER
 BRUCE  MANSFIELD
 2
  917.0 HW (NET)
 CAPACITY  FACTOR,  x
 TOTAL  CAPITAL,  J/KVKYEAR)
 TOTAL  ANNUAL, HILLS/KWH(YEAR)
 COST ELEMENTS
  40            65            65
  120.6(1975)   102.1(1975)   102.1(1975)
  14.3(   0)     6.7(    0)    10.8(   0)
B,C,E,E,I,L,  C,E,G,I,H,S,  C,E,G,I,N,S,
S,U,W,X       U,W          U,V
PHILADELPHIA ELECTRIC
tft6 YS TQfl€
1 A
120.0 HW (NET)
PUBLIC SERVICE OF NEW MEXICO
SAN JUAN
1
361.0 HW (NET)
PUBLIC SERVICE OF NEW MEXICO
SAN JUAN
?
350.0 MW (NET)
SOUTH CAROLINA PUBLIC SERVICE
2
140.0 HW (NET)

CAPACITY FACTOR, x
TOTAL CAPITAL, S/KW(YEAH)
TOTAL ANNUAL, KILLS/KWH(YEAR)
COST ELEMENTS
CAPACITY FACTORi X
TOTAL CAPITAL, */KW(YEAR)
TOTAL ANNUAL, MILLS /KWH (YE AR )
COST ELEMENTS
CAPACITY FACTOR, 1
TOTAL CAPITAL, S/KWCYFAR)
TOTAL ANNUAL, WILLS /KWH (YE AR )
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, $/KW(YEAR)
TOTAL ANNUAL, MILLS /KWH (YE AR)
COST ELEMENTS

0
15*. 7(1972)
.0( 0)
D,F,N,P
0
127.9(1977)
.0( 0)
A,C,E,N
0
127.9(1977)
.0( 0)
A.,C,E,N
80
47.4(1976)
1.6( 0)
C,F,J,M,SiV

65
233. 3(1972)
.C( 0)
C,E,N,P
65
.OC 0)
.0( 0)

65
.OC 0)
.C( 0)

65
66,* (1976)
2.9( 0)
Ct£,J.K,MrS,
U,W
65
.oc -p>
.0( 0)

.OC 0)
,C( 0)

.OC 0)
.DC 0)

65
6.4(1976)
3.2C 0)
CfStJ,K,HpSi.
U,W
                           ******   INDICATES COST  FIGURES NOT YET AVAILABli

                                              A-  21

-------
EPA UTILITY f6D SURVEY:  DEClKBER  197S  -  JANUARY 1979
                                            SECTION A-1
                                 COSTS  FOR  OPERATIONAL F6D SYSTEMS

UNIT DESCRIPTION

SOUTHERN MISSISSIPPI EL£CTRjC
R.D. MORROW
1
124.0 NW (NtT)
SPR1N6FIELD CITY UTILITIES
SOUTHWEST
1
194.0 MU (KE I)

COST DESCRIPTION

CAPACITY FACTOR, X
TOTAL CAPITAL, S/KU(Y£AR)
TOTAL ANNUAL, MILLS /KWH (YE AR)
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, $/KW(YEAR)
TOTAL ANNUAL, MILLS /KWH (Y£ AR)
COST ELEMENTS



REPORTED ADJUSTED STANDARDIZED

0 65
3 7«4 (1975 )
.0( CO
C,E


.0( 0>
,0( 0)

0 65
77.3(1974) 117.6(1974)
.OC 0) 6
C,F,H,J,P C,E,
.Z( 0)
H,J,K,P,
s.u.u
TENNESSEE VALLEY AUTHORITY
WICOUS CREEK
8
550.0 MW (NET)
CAPACITY FACTOR, *
TOTAL CAPITAL, S/KUCYEAR)
TOTAL ANNUAL, MILL S/KWH(YE AR)
COST ELEMENTS
0 65
69.5(197?) 113
.0( 0> 5
C,E,J C,E,

.1(1976)
.3( 0)
J,S,U,k
ADJUSTED
ts
.0 C 0)
.OC 0)

65
117.6(1974)
6.9( 0)
C,E,H,J,K,P,
S.U.U
65
113.1(1976)
5.K 0)
C,F,J,S,U,W
                         ******   INDICATES COST FIGURES  NOT  YET AVAILABLE

                                            A-  22

-------
               EPA UTILITY F60 SURVEY: DECEMBER  1978  -  JANUARY  1979
             SECTION A-2
COSTS FOR NON-OPERATIONAL FSO SYSTEMS

UNIT DESCRIPTION

ALABAMA ELECTRIC COOP
TOMBI6BEE
?
179.0 HW (NET)
ARIZONA ELECTRIC POWER COOP
APACHE
3
180.Q MW (NET)
BASIN ELECTRIC POWER COOP
LARAMIE RIVER
1
600.0 HW (NET)
BASIN ELECTRIC POWER COOP
LARAMIE RIVER
2
600.0 MW (NET)
BIG RIVERS ELECTRIC
GREEN
1
242.0 MW (NET)
BOSTON EDISON
MYSTIC
6
.0 MW (NET)
CENTRAL ILLINOIS PUBLIC SERV
1
617.0 MW (NET)
COLORADO UTE ELECTRIC ASSN.
CRAIG
1
450.0 MW (NET)
COLORADO UTE ELECTRIC ASSN.
CRAIG
2
450.0 nw (NET)
COMMONWEALTH EDISON
POWER TON
11
425.0 MW (NET)

COST DESCRIPTION

CAPACITY FACTOR, X
TOTAL CAPITAL. */KW(YEAR)
TOTAL ANNUAL, MILL S /KUM ( YE AR )
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, S/KW(YEAR)
TOTAL ANNUAL, KILLS /K«H < YE AR )
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, S/KWCYEAR)
TOTAL ANNUAL, MILLS /KWH ( YE AR)
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, $/KW(YEAR)
TOTAL ANNUAL, MILLS /KWH ( YE AR )
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, i/KW(YEAR)
TOTAL ANNUAL, MILLS /KWH (YE AP)
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, S/KW(YEAR)
TOTAL ANNUAL, MILLS /KWH ( YE AR )
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, S/KW(YEA*)
TOTAL ANNUAL, K1LLS/KWH(YE AR )
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, $/KW(YEAR)
TOTAL ANNUAL, MILLS /KWH (YE AR)
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, J/KW(YEAR)
TOTAL ANNUAL, «ILLS/KWH
-------
EPA UTILITY FGD SURVEY:  DECEMBER  197E  - JANUARY 1979
                                            SECTION A-2
                               COSTS FOR NON-OPERATIONAL FSB SYSTEMS

UNIT DESCRIPTION
COMMONWEALTH EDISON
WILL COUNTY
1
.0 MW (NET)
DETROIT EOISON
ST. CLA1R
6
.0 MW (NET)
ILLINOIS POWER COMPANY
WOOD RIVER
1
.0 MW (NET)
LOUISVILLE 6AS 8 ELECTRIC
CANE RUN
6
378.0 MW (NET)

PACIFIC POWER & LI6HT
JIM 8RIDGER
t
550.0 MW (NET)
POTOHAC FLECTRIC POWER
DICKERSON
3
.0 MW (NET)
PUBLIC SERVICE OF COLORADO
V A L*0 NT
5
.0 MW (NET)
SALT RIVER PROJECT
CORONADO
2
2PO.O MW (NET)
SOUTHERN INDIANA GAS S ELEC
«.B. BRoWN
1
265.0 MW (NET)
SOUTHERN MISSISSIPPI ELECTRIC
R.O. MORROW
7
124.0 NW (NET)

COST DESCRIPTION
CAPACITY FACTOR. X
TOTAL CAPITAL. S/KW(YEAR>
TOTAL ANNUAL, MILLS /KWHf YE AR )
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, $/KW(YEAR)
TOTAL ANNUAL, « ILL S /KWH ( YE AR)
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, S/KW(YEAR)
TOTAL ANNUAL, MI LLS /KWH ( YE AR)
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, J/KW(YEAR)
TOTAL ANNUAL, MILLS/KWH(YEAR)
COST ELEMENTS

CAPACITY FACTOR, X
TOTAL CAPITAL, J/KWfYEAR)
TOTAL ANNUAL, MI LLS /KWH (YE AR)
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, */KW(YEAR)
TOTAL ANNUAL, MILLS /KWH (YE AR)
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL. J/KH(YfAR>
TOTAL ANNUAL, KILLS /KWH (YE AR )
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, */KW(YEAR)
TOTAL ANNUAL, HILLS /KWH (YEAR)
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, J/KW(Y£AR)
TOTAL ANfUAL, HILLS/KWH( YE ARJ
COST ELEMENTS
CAPACITY FACTOR, X
TOTAL CAPITAL, $/KW(YEAR)
TOTAL ANNUAL, MILLS /KWH (YE AR)
COST ELEMENTS

REPORTED
49
113.0(1972)
13. 1C 0)
B,C,E,G,J,X
0
80.3f1976>
9.6( 0)
B,C ,E,J,I",X
0
82.5(1972)
.Of 0)
A,C,E,«,N
0
57.9(1977)
3.2( 0)
C,E ,H,M,S,V,
W
0
120.0(1979)
.CC 0)
C,E,J
0
68.0(1978)
.Of 0)
A.C.E.M
0
87»0(19?«)
.0( 0)
B,C,E,J
0
98.0<197R)
.0( 0>
C»E
0
43.2(1979)
.0( 0)
C,E,G
0
37.4(1975)
.0( 0)
C,E

	 COST 	
ADJUSTED STANDARDIZED
ADJUSTED
65 65
.Q< 0) -0( 0)
.0( 0) .0( 0)

65 65
.0( 0> .0( 0)
.0( 0) .0( 0)

65 65
.o( o> .or 0)
.0< 0) .0( 0)

65 65
.0< 0) .0( 0)
.01 0) .0( 0)


65 65
.0< 0) .0( 0)
.0( 0) .0( 0)

65 65
.0( 0) ,0( 0)
.DC 0) .Of 0>

65 65
,0( 0) .£>( 0)
.Of 0> .0( 0)

65 65
.Of 0) .Of 0)
.Of 0) .Of 0)

65 65
.Of 0) .Of 0)
.Of 0) .Of 0)
65 «5
.Of 0> .Of 0)
.Of 0) .Of 0)

                          **«.**   INDICATES COST  FIGURES NOT VET AVAILABLE

                                             A-  24

-------
                 APPENDIX B
          FGD PROCESS FLOW DIAGRAMS
THIS APPENDIX COMPRISES OPERATING FGD SYSTEMS
ARRANGED ALPHABETICALLY ACCORDING TO UTILITY

-------
CO
I
ro
                                                         DILI BCTCLE PIMPS-1
                                                           (TVD TO»L)
                                                               LIWSTIK StUtUr PVHPS
                                                                   (THO TOTHl)
J
ABSORBED BICYCLE PUWS -
   (SII PER UNIT)
MWTE-I
SLUPBt
 SWW
    WtSTE SLURRT
I      \  \
                                                                                                                                           US TO STUCJ
                                                                                                                                               IT 3
                                                                                                                   (THO T01*L)
                                                                                                                                  SWEMITE
                                                                                                                                    IE Tim
                                                                                                                              >-SC«UBMI> WSTC
                                                                                                                                STOMGE KCID
                                                                        Alabama  Electric,
                                                   Simplified Process Flow Diagram for Tombigbee 2

-------
            FLUE
            t>S
                      NOSTU
                       f«M
i
co
                                                           Lorn*
                                           SMLI no Tint
                                           ««' [ICHttCd
J —



—

U I loimt

JTEM
t
s


\ -s

r 	 TX S
OME
MS
                                                                                                                HOSIDI  auuflti







LIHESTCMC Slum H*t£l»

WTEI PWUUC



~7


L









1 WHTIOIUVTf U\AXX)
SCRUOER

,
,-J ,, .„
Monu A |
ASH-LAOOll 	
MATES
1



























,
U
7A
S









.
[Z
NK
|^
a.












(.S



























TACK







rc
TAIC
s










IS
K
X*









































__..-
^

t



i
1 SURSE TMI

L


PAKTICUIAT{|
soMcn I

• L
HDOULE •
LADW
nt




I i ^



r~

[
j




i ,
ET«


10
                                           Arizona Public Service, Choila 1 :
                                            Simplified Process Flow  Diagram

-------
ro
                                                                             b    fi
                                                                           l.D. FMS  F.O. FJU6
                                                             Htcrecuunion   	
                                                              T*«B   RECHOJUTIO*
                                                                     WBPS
                                                Central  Illinois Light,
                                   Simplified  Process Flow Diagram of Duck Creek 1
                                       Power Plant and  Emission Control  System

-------
       MAKEUP HATER
       (POND HATER)
            FROM ESP -
            FLUE GASES
         LIME FROM
         STORAGE
          SERVICE
           HATER
DO

01
                                               L_
    TO STACK - FLUE GASES


HIST ELIMINATOR
                                                                ZEQ223.A
                                                               >1IJ>JJJJJIT
SLURRY
STORAGE
TANK


s
              TO OTHER
             RECYCLE TANK
                                                                                              » OVERFLOW
                                                                                               TO ASH POND
                                                                                                FROM OTHER
                                                                                                RECYCLE TANK
                                                                                                                                   ••TO IOCS
                                   Columbus  and  Southern Ohio Electric,  Conesville 5  and
                                     Simplified  Process  Flow Diagram for a Riven  Module
                              6:

-------
DO
I
CTl
                                               1ST  STAGE
                                               ADJUSTABLE  VENTURI
                                               FOR  FLY  ASH/S02
                                                                2ND STAGE
                                                                S02 ABSORBER SCRUBBER
                 CaS03/S04

                 FLY ASH SLURRY
                            RECYCLE RETURN SYSTEM
                            TO
                       STABILIZATION
                         FACILITIES
                                      Duquesne Light, F. R. Phillips FGD System:
                                                   General Diagram.

-------
     JET BUBBLING REACTOR
                          STACK
WATER
          CX        ~— ^vcm . ^.S£
          jSy \i trt~* •»* ' v***^"    """"    «w«i^j >-— M t
    - ^r^F^.'T^^.	41--
    '.-^*-^ftv "•-"
-------
                                                      STACK
                                                                     I.D. FAN
CO
I
oo
              COAL
              SUPPLY
                FEEDER
            PULVERIZER
STACK GAS


  AIR HEATER
STACK GAS
REHEATER
                                                      STACK GAS
                                                      SCRUBBER
                        LIME
                        PREPARATION
                        TANK
                       CLARIFIER
                                                             RECYCLE
                                                             PUMP
                               Kansas  City Power  and  Light,  Hawthorn Units 3 and 4:
                          Simplified Process  Flow Diagram  of the  Lime  Scrubbing  Process
                      MAKE UP
                      UATER

                 TO ASH DISPOSAL
                 POND

-------
CD
I
                                                                                     STEAM COAL
                                                                                     REHEATER
                                                AIR
                                              HEATERS        TO
                                                       RECIRCULATIO
                                                           TANKS
 ENTURI
SCRUBBER
  VENTURI
RECIRCULATION
PUMPS
                                                                                       HYDROCLONE
                                                                                       CLASSIFIER
                                                                                                   LIMESTONE
                                                                                                    BUNKER
                                                           LIMESTONE
                                                             SLURRY
                                                            STORAGE
                                         160 ACRE
                                      SETTLING POND
                        BOILER
                    WET BALL
                      MILL
                                                Kansas  City  Power  and Light,
                                          LaCygne 1  FGD System:   General  Diagram

-------
                                  FURNACE
                                                              DAMPERS
CD
I
                                                                             ONE
                                                                            STACK
             TWO PRECIPITATORS
                        FOUR I.D. FANS
WATER RETURN TO
 REACTION  TANKS
                                                                           BLEED  PUMP

                                                                   RANSFER TANK
                                              FOUR,
                                            REACTION
                                             TANKS
 SLUDGE DISPOSAL
      POND
                                             Kansas Power and Light,
                       Schematic of Jeffrey Steam Generator and Emission Control  Equipment

-------
       LllCSTOXC IMTCR FOR
        HOW5R  SLUMYIHG
                                                  D1LUT1W KATER (FRO*
                                    AOOIT|»C STORAGE     BEC1RCULATIOH TANkj
                                     TA« 60 SOLIDS
CO
I
I
                                                     ADDITIVE
                                                     DILUTION
                                                        AOOULVt
                                                      -CT
                                                        ^TO 01HEB
                                                        SCRUSBES
                                                        NODULE
                                                                                              ONE OF TW NODULES
                                                                                    TO STACK
                                                                                     FLUE GAS FRflC
                                                                                     AIR PREHEATER
                                                              OUTLET DAMPER
                                                                                REHEATER


                                                                                      REHEATER BLOWER
                                                                                                                                	.      MIST ELIMINATOR
                                                                             ADDITIVE
                                                                            (FROM MILL)
                                                                                                        MAKEUP
                                                                                                        HATER"
                                                                                                   ROD SCRUBBER
                                                                                                    SPRAr PUMP
                                          ftl
                                                                                     ADDITIVE
                                                                                      FEED
^*
[I
<
1
1
^ /a
i T
1' lilj
REACTION I.
TANK :r
STRAINERS:
y

_



a

/
ABSI


                                                                                                      Q_
                                                                                                   ADDITIVE
                                                                                                   STORAGE TANK
                                                                           1
                                                                  EFFLUENT
                                                                   BLEED
                                                                                                                              COMMINUTOR
                                                                                                                                -TO POND

                                                                     Kansas Power and  Light,
                                                           Lawrence  No.  4  Operational  FGD  System
                                                               Simplified Process  Flow  Diagram

-------
             HATER fW
      LIKSTONt SLUUH1N6
                                                DILUTIM HATER
                                                (FROM RECIRCULATION TANK)
                     SLUBJ
03
I
                                                                                                                            STACK I POND RETURN
                                                                                                                                  (MAKE-UP)
                                                                                                                         	I    WATER
                                                                                                                      TO STRAINER I
                                                                                                                        WASHERS "*^
                                                                I	
                                                                                                                                   THICKENER
                                                                                                                                UNDERFLOW PUMPS
                                                                                                                                                WEIR
                                                                                                                                              OVERFLOW
                                                                                                                                               TO
                                                                                                                                             SETTLING
                                                                                                                                               POND
                                                                 Kansas Power and Light,
                                                       Lawrence No.  5 Operational  FGD  System
                                                           Simplified Process  Flow Diagram

-------
DO
I
                                                               ELECTRICAL
                                                               GENERATING
                                                               UNIT NO.  1
ELECTRICAL
GENERATING
UNIT NO. 2
                                                          BOILER
NO. 1 I
                                                                                  BOILER NO.  2
                                                                                                           BOILER
                                      AIR
                                                              Hi      MECHANICAL      p]
                                                              V      COLLECTORS      M      £X,STI|(6

                                                           I.D.P)                  '-"-O       STACIC
                                                           FAN I,/	FAN I/'     | H Q fl |      FA"
         NO.  3 I
                                                                                           RECYCLE      r".  MIX/HOLD TANK
                                                                                                      ^^
                                                                                                      SPARE
                                                                                                                  MAKEUP HATER
                                                                                                                    MAKEUP HATER
                                                                                      SPARE
                                                                             SPARE
                                                          Kentucky  Utilities,
                                       Green River FGD  System:   General  Process Diagram

-------
                                                                      QUENCHER
                                                                                  HIST
                                                                                ELIMINATOR
                                                                                (CHEVRON)
                           ELECTROSTATIC
                           PRECIPITATOR
                BOILER
                 FLUE
                 GAS
CO


-P.
                                                                                CONTACTOR
                                                                                SCRUBBfR
                                                                                 MODULE
                           vv\/
                                              DAMPERS	V
CONTACTOR
 SCRUBBER
  MODULE
                                                             FAN
                                                                                                        MIST
                                                                                                     ELIMINATOR
                                                                                                      (CHEVRON)
                         FLOCCULANT
                          ADDITION
                                         Louisville  Gas and Electric,  Cane  Run 4
                                       FGD  System:   Simplified Process Flow Diagram

-------
                                                                                                   REAGENT
                           ELECTROSTATIC
                           PRECIPITATOR
CO
I
BOILER
 FLUE -
 GAS
                                                       "TO STACK
                                                      -STEAM
                                                       REHEAT
                                                    SPRAY
                                                    TOMER
                                                                                          LIME SLURRY
                                                                                           FEED PUMP
REACTION
TANK



— 1 	
RECYCLE
PUMP 1
/~s
^
i


1 THK
/
                                   Louisville  Gas and Electric,  Cane Run  5 FGD  System:
                                               Simplified  Process  Flow Diagram

-------
CO


cn
                                                                                          50GPM FRESH WATER l*VE I
                                                                                         ZSOGPM FRESH WATER (MAX. SHORT-TERM)
                                                                                               pH6 OR HIGHER
                                                                           5 «OO wv - TOTAL:
                                                                         .4 7.TOO
                                                                    »H 9 J 4.O30 CPM/SCPuBBi"
                                                       FLOW HCTEA          8.IOO CPM ITOTAL)
               NOTE
                CPU FIGU«t5 «EPBf5tHT JO. I RATIO

                0»«/IOOO
                                                                TO VACUUM FVEH HOUSE
    GAS INLET STEAM 0LO»Cf»S
                                          WATCH


                                     FOT CHAIN WATER


                                     ADDITIVE K.UIIIIT WATCH


                                     1CRU88C* OI5CHAHOf MATE*


                                            PI1CHAMC
Louisville Gas  and Electric,
Paddys Run No.  6  FGD  System:
    Process Flow Diagram.

-------
     FLUE
      GAS
 EMERGENCY WATER
         PLENUM
DO


-J
             BLEED
                        MIST
                        ELIMINATORS
     3	"CLEAN FLUE GAS
    HXH-SEAL WATER SUPPLY
.UNDERSPRAY    ^   MAKEUP
                  'WATER
                                  STEAM
                                                                                        REHEAT
                                                                              WASH TRAY POND
                                     FLY ASH POND
                                 Montana Power, Col strip  1  and 2:
                               Process diagram of a  given FGD module.

-------
                                                                     TO CHIMNEY
                           FURNACE
              COM.
            PULVERIZER
DO


CO
                                        MECHANICAL
                                          OUST
                                        COLLECTOR
                                      (HULTICLONES)
BYPASS f



-Biirt^

                                     HEATER
                                p—L_n
                                                     BOILER
                                                    1.0. FAN
                                       BOILER
                                      F.O. FAN
                                           PURGE
                                         TO ASH POND
                                                  ASH POND PUMP

       ip
                                                                                          REHEATER AIR FAN
TRAY RECYCLE PUMP

        SODA ASH
                                                                                                                  EVAPORATION PONDS
                                                                                                                       ON MESA
                                                                                                                  HATER FROM
                                                                                                                  ASH PONO
                               ASH POND
                                                                                                         SH MAKEUP
                                                                                                         TANK
                                                                                                                   ASH AND HATER
           SODA ASH
          SLURRY PUMP
                                            Nevada  Power,  Reid Gardner  1,2  and 3:
                                            Process diagram  of a given  FGD  system.

-------
                                              DISCHARGE
                                              TO STACK
                                                                                              CONDENSER
                              PRESCRUBBER
                           {VARIABLE-THROAT
                                  VENTURI)
CO

to
         FLUE GAS FROM
             UNIT #11^
               •     ~7~

FLY ASH PURGE TO POND
                                                    TRAY TOWER
                                                     ABSORBER
    PURGE
    STREAM
                                                               TREATED
                                                             PURGE STREAM
      TO S02
     REDUCTION
       PLANT
                                                               CENTRIFUGE
                                    STORAGE
                                        BIN
CRYSTALLIZER
                                                     SODIUM SULFATE
                                                          CAKE  	
                                                                  ws,|« STEAM
                                                                                                 EVAPORATOR/
                                                                                                  CRYSTALLIZER
                QJ COMPRESSOR
                                           DRIED
                                           SULFATE
                                           PRODUCT
                                            Northern Indiana Public Service,
                                    D. H. Mitchell No. 11 Wellman. Lord/Allied System:
                                                General Process Diagram.

-------
                  FLUE GAS
                    TO
                  SCRUBBER
                 \ FIRST
                 * ^T H r* r*
co
i
r\>
o
                  ooo
                 OXIDIZER
                                    REHEATER
                  GAS
              TO STACK
 RIVER
MAKEUP  —
 WATER
                                     MIST
                                   ELIMINATOR
                                  OVERFLOW POTS
                                 AND MARBLE BED

                                 REACTION
                                   TANK
                                                                           WEIR
                  THICKENER
       RECIRC
        TANK
                                                            THICKENER
                                                            UNDERFLOW
                                                              PUMP
•A
 SPRAY
 PUMP
                                                                                   ASH POND
                                                    LIMESTONE —i
SLURRY
 TANK
\A
SLURRY
 PUMP
                           ASH POND
                         RETURN PUMP
                             Northern  States  Power,  Sherburne 1 and 2 FGD  System:
                                          Simplified Process  Flow Diagram

-------
CD
I
to
                                 Pennsylvania Power, Bruce Mansfield FGD System:
                                      Process Flow Diagram for Unit 1 or 2

-------
oo
i
IM
ro
  FRESH
  WATER	>
  INLET

     BACKWASH
     SPRAYS
                         STACK GAS
                         FROM I.D.
                         FANS
                          PARTICIPATE
                          SCRUBBER
HUMIDIFIED
GAS STREAM
                                      Mg (OH)2 SLURRY
                         PARTICULATE
                         SCRUBBER
                         SURGE TANK
                                        TO WASTE WATER
                                       "TREATMENT SYSTEM
                                                                                 CLEAN GAS UUTLL1
                                                                                   MIST ELIMINATORS
                                                                                 MIST ENTRAPMENT SEPARATOR
               S0_ SCRUBBER
               SURGE TANK
                                              Philadelphia Electric Co.,
                                               Eddystone 1  FGD System:
                                                General  Process Diagram.
                                       VENTURI  ROD MODULES
                                                                                         SCRUBBING  SLURRY  INLET
                                                                                              TO Mg S03
                                                                                               RECOVERY

-------
      BOILER
    \7
                                   EXISTING
                ELEC.PRECIP.   MR
                            HEATER
CO
  LIMESTONE
  FEED BIN
(ORE IN USE
  FOR TUO
  BOILERS)
         MEIOJ FEEDER
         (OK IN USE)
                                                                                                   VENTURI SORBER
                                                                                                    SCRUBBER™
                                                                                                    (ONE IN USE)
                            UET BALL MILL
                            (ONE IN USE)
HILL SLURRY  J2L  SLURRY STORAGE
   -—..„.,     rtinr     TAHV
                                                ORE SPARE)
  SLURRY
   PUMP
(ONE IN USE
 ONE SPARE)
                                                                                                RECYCLE TANK
                                                                                                (ONE IN USE)
                                                                                                  RECYCLE
                                                                                                   PUMP
                                                                                                (TWO IN USE
                                                                                                 ONE SPARE)
                                                     THICKENER
                                                       SUPPLY
                                                        TANK
                                                    (ONE IN USE)
                                                                                                                                           PUMP
                                                                                                                                         ONE IN USE
                                                                                                                                         ONE SPARE)
                                          Southern Mississippi  Electric,  R.D. Morrow  1:
                                                   Simplified  Process Flow  Diagram

-------
                               SCRUBBER INLET
                             TEST PORT LOCATION
DO
I
ro
                                                                             TOP OF STACK
                                                                            ELEVATION IMS'

                                                                               TEST PORT
                                                                            ELEVATION 1516*
                                                                           -TOP OF OUTLET BREECHING
                                                                              ELEVATION 1372'-2 3/8*
                                                                           -TOP OF BYPASS BREECHING
                                                                             ELEVATION 1307'- 8 1/2*

                                                                              GRADE ELEVATION 1261*
            PRECIPITATOR
             INLET TEST
            PORT LOCATION
                                   SCRUBBER INLET'
                                  TEST PORT LOCATION
                                           Springfield  City Utilities,  Southwest 1:
                                                       Simplified  Process  Diagram

-------
ro
01
            i  AIR
            IFUEL OIL >— *-| REHEATER {-- ,
                    TCA
                  SCRUBBERV-J&
                                     
-------
ro
                              REHEATER -
                                           1.
                                                  — ^--
    JFLUE GAS>~O—fr-
         VENTURI
         SCRUBBER
                                                                      PROCESS
                                                                       WATER
                                                                     HOLD TANK
                          SCRUBBER
                          EFFLUENT
                           HOLD
                           TANK
      SAMPLE POINTS
      O6AS COMPOSITION
      &PARTICULATE  COMPOSITION  &  LOADING
      ©SLURRY OR SOLIDS COMPOSITION
	GAS STREAM
	LIQUOR STREAM
                                              SETTLING  POND
                        Tennessee Valley Authority, Shawnee  10  Prototype  Unit:
                                         General Process Diagram.

-------
                               FLUE  GAS
    MAKE-UP WATER
CD
I
ro
                                                                        VENT  AIR

                                                                          I
                                                            OXIDATION
                                                             TANK

                                                                       D
                                                                                 CLARIFIED LIQUOR
                                                                                      WATER
                      SPRAY TOWER EFFLUENT
                            HOLD TANK
:z>
Z3
». ,*
1
t




^•4 	

1
c
o

c
t vl
i
DESUPERSATURATION
TANK
   BLEED TO
 DEWATERING
_   SYSTEM
                          Tennessee Valley Authority,  Shawnee 10 Prototype Test Unit:
                        Modified Venturi/Spray Tower System for 2-Stage  Oxidation Testing.

-------
CD
                                FROM
                                ITRAINS
 REHEATER

STEAM
                                                         ENTRAPMENT
                                                          SEPARATOR
                                B,C, AND D
~ TO ASH

DISPOSAL POND
TO STACK PLENUM
"I •*-
'
FHflM FSP
^N

•

             cz
                                   FAN
             - FROM B. C, AND D TRAIN

               VENTURI CIRCULATION TANKS]
                 TO SETTLING POND
                                                                                     SLURRY  PUMP
                                                                                     SEAL WATER
                                                                                      . HEADER
                                                                                     / -^ t  ^~	
                                                            RIVER WATER
                                                                                TO TRAINS
                                                                               B,C, AND D
                                                         ^   PUMPS


                                                          FROM POND WATER
                                                                                                     RECYCLE PUMPS


                                                                                               FROM LIMESTONE SLURRY
        VENTURI
      CIRCULATION
        TANK AND
         PUMPS
 ABSORBER
CIRCULATION
 TANK AND
   PUMPS
                               EFFLUENT SLURRY
                             SURGE TANK AND PUMPS
BT°CTIAHDSrii Zl  LIMESTONE SLURRY
B,C,ANDU|J_J    STORAG£ TANK

   LIMESTONE SLURRY
     FEED PUMPS
                            Tennessee Valley Authority, Widows  Creek  8 FGD  System:
                           Process Flow Diagram for One of the  Four Scrubber Trains

-------
                                         FM WHET DJWERv.
                                                               - TWER INLET aura
                        FROM BOILER
                       AIR PREHEATERS-
•<]
DO
I
ro
vo
                                                            inuRE^ LOCATION OF
                                                                   FUTURE
                                                                =1  REHEATER
                                                                                                     PUf> SEN. HATER,
                                                                                                     BALL HILL COOLING
                                                                                                     AND HOSE STATIONS
                                                                                           MAKEUP HATER TO
                                                                                            LIMESTONE AREA
                                                                        ASH POO)
                                                                       RHURR HATER
                                                                      (RECYCLE HATER)
              tssj
                                                             Texas  Utilities,
                                Simplified Process Flow Diagram for One of the Two Identical
                                                        Martin  Lake FGD Systems

-------
                                                                                                                                                       FAN
CD
 I
ۥ>
o
                                                                                                                                                      TQ A$H AR£A
                                                                         BYPASS

                                                                         TO SPRAY TOUER 301
                                                                                                            FROM SPRAY TOUER  301
                                                                         TO SPRAY TOUER 201
                                                                                                              FROH SPRAY TOUER 201


                                                                                                                         BYPASS
                                        TO SPRAY TOUER 301
                                                                                                         HIST ELIMINATOR
                                                                                                           WASH HATER
                                        TO SPRAT TWER 201 -4
                                                                                                           TO SPRAY TOUER 201
                                                                                                                                 FROH SPRAY TOUER 301
                                        TO SPRAT TOWER 301
                                                                                                           TO SPRAY TOUER 301
                                                                                                                               FROM SPRAY TOUER
                                        TO SPRAT TOUER 201 -»
                                        TP SPRAT TOUER 301 -^
                                        TO SPRAY TOUER 201
                                LIMESTONE
                                 STORAGE
                                   BIN
TO SPRAY TOUER 301
TO SPRAY TOUER 201
                                                                                                          TOTAL PIMP SEALS AND
                                                                                                          INSTRUMENT PURGE HATER
                                    LIMESTONE GRINDING
                                         SYSTEM
                                           LIMESTONE SLURRY
                                           TAMC AGITATOR
                                                                     -LIMESTONE
                                                                   _, r\SLURRY
                                                                         PUMP
                 FROM
           LIMESTONE STORAGE
                                                                                                                                     FROM ASH HATER
                                                                                                                                     RETENTION POND
                                                                SO, REMOVAL AREA
                                                                   SUN? PUHPS
                                                                                          S02 REMOVAL AREA SUB>
                                                                        Texas  Utilities,
                                               Simplified  Process Flow  Diagram  for Monticello  3

-------
APPENDIX C



DEFINITIONS
    C-l

-------
                           DEFINITIONS
Boiler Capacity Factor:
Boiler Utilization Parameters:
Byproduct
Disposal
Efficiency:
     Particulate Matter
     SO,
FGD Viability Indexes
(kwh generation in year)/maxi-
mum continuous generating
capacity in kW x 8760 hr/yr).

Hours boiler operated/hours  in
period, expressed as a percen-
tage.

The nature  (e.g. elemental
sulfur, sulfuric acid) and
disposition (e.g. stockpile  on
site, marketed) of the end
product produced by systems
that generate a saleable
product.

Disposal method for throwaway
product systems producing
sludge including:  stabilized
or unstabilized sludge, inter-
im and final disposal sites
and disposal type (minefill,
landfill, etc.) as well as
disposal location.
The actual percentage of
particulate matter removed by
the emission control system
(mechanical collectors, ESP,
or fabric filter and FGD) from
the untreated flue gas.

The actual percentage of SO,
removed from the flue gas by
the FGD system.  Design
removal efficiency values are
presented for nonoperational
systems for which actual
removal data are not avail-
able.

Several parameters have been
developed to quantify the
viability of FGD system tech-
nology.  Various terms such as
"availability," "reliability,"
"operability," and "utiliza-
tion" are used to accurately
                               02

-------
Availability  Index
Reliability  Index
represent the operation of any
FGD system during a given
period.  The above-mentioned
parameters are defined below
and discussed briefly.  The
objectives of this discussion
are to make the reader aware
that several different defini-
tions are being used and to
select appropriate parameters
that can be used for reporting
purposes so that reasonably
consistent comparisons can be
made.

Hours the FGD system is avail-
able for operation (whether
operated or not) divided by
hours in period, expressed as
a  percentage.  This parameter
tends to overestimate the
viability of the FGD system
because it does not penalize
for  election not to operate
the  system when it could have
been operated.  Boiler down-
time may tend to increase the
magnitude of the parameter
because FGD  failures generally
cannot occur during such
periods.

Hours  the  FGD  system was
operated  divided by the hours
the  FGD  system was called upon
to operate,  expressed  as a
percentage.   This  parameter
has  been  developed in  order
not  to penalize the FGD  system
 for  elected outages,  e.g.,
periods  when the FGD  system
could have been run but  was
not run  because of chemical
 shortages,  lack of manpower,
 short duration boiler opera-
 tions, etc.  The main problem
 in using this formula is the
concise determination whether
or not the system was "called
upon to operate" during a
 given time period.  In addi-
 tion,  an undefined value can
                           C-3

-------
     FGD Operability Index
     FGD Utilization Index
End Product
     Saleable
result when the FGD system  is
not called upon to operate  for
a given period  (e.g., turbine
or boiler outage when FGD
system is available).

Hours the FGD system was
operated divided by boiler
operating hours in period,
expressed as a percentage.
This parameter indicates the
degree to which the FGD system
is actually used, relative  to
boiler operating time.  The
parameter is penalized when
options are exercised not to
use the FGD system in periods
when the system is operable.
In addition, an undefined
value can result when the FGD
system is not called upon to
operate for a given period
(e.g., turbine or boiler
outage when FGD system is
available).

Hours that the FGD system
operated divided by total
hours in period.  This para-
meter is a relative stress
factor for the FGD system.  It
is not a complete measure of
FGD system viability because
the parameter can be strongly
influenced by conditions that
are external to the FGD system
(e.g., infrequent boiler
operation will lower the value
of the parameter although the
FGD system may be highly
dependable in its particular
application).
The S02 removed from the flue
gas is recovered in a usable
or marketable form (e.g.,
sulfur, sulfuric acid, gypsum,
ammonium sulfate, sodium
sulfate).
                               C-4

-------
Energy Consumption,  %
       rowaway                      The ^ removed from j.ne fiue
                                    gas is not recovered in a
                                    usable or marketable form and
                                    resulting sulfur-bearing waste
                                    products must be disposed in
                                    an environmentally acceptable
                                    fashion.

                                    The percentage of gross unit
                                    electrical generating capacity
                                    consumed by the FGD system,  as
                                    defined by the following
                                    equation:

                                    [Net MW W/o FGD - Net MW w/FGD]/
                                    Gross unit rating]

Equivalent Scrubbed Capacity (ESC)  The effective scrubbed flue
                                    gas in equivalent MW based on
                                    the percent of flue gas scrubbed
                                    by the FGD system.
FGD Status:
     Category  1


     Category  2
     Category  3
     Category 4
     Category 5
     Category 6
                                    Operational -  FGD system  is  in
                                    service removing  S02.

                                    Under Construction -  ground
                                    has been broken for installation
                                    of FGD system,  but FGD system
                                    has not become operational.

                                    Planned, Contract Awarded -
                                    contract has been signed  for
                                    purchase of FGD system but
                                    ground has not been broken for
                                    installation.

                                    Planned, Letter of Intent
                                    Signed - letter of intent has
                                    been signed, but legal con-
                                    tract for purchase has not
                                    been awarded.

                                    Planned, Requesting/Evaluating
                                    Bids - bid requests have  been
                                    released but no letter of
                                    intent or contract has been
                                    issued.

                                    Considering only FGD Systems -
                                    an FGD system  is proposed as a
                                    means to meet  an S02 regulation.
                              C-5

-------
     Category 7


     Category 8
FGD Vendor
Fuel Characteristics
General Process Type
New
Process Additives
Process Type
Considering an FGD system as
well as alternative methods.

Nonoperational - FGD system
has been operated in the past
but has been shut down perma-
nently or for an extended
indefinite period of time.

A firm that fabricates and
supplies flue gas desulfuriza-
tion systems.

Type of fuel, average gross
heating value in Btu/lb.
average percent ash and
average percent sulfur content
for fuel as fired.

The manner in which the S02
from the flue gas is collected,
e.g. wet scrubbing, spray
drying, dry adsorption.

FGD unit and boiler were
designed at the same time or
space for addition of an FGD
unit was reserved when boiler
was constructed.

A chemical compound or element
which is added to the process
or normally found with the
main process reagent in small
quantities (e.g. Mg, adipic
acid) to promote improved
process operation (e.g. scale
reduction, increased SO,
removal efficiency).

Company name if process is
patented.  Generic name if
several companies have similar
processes (e.g., Lime, Limestone,
Wellman Lord, Thoroughbred
121).
                              C-6

-------
Regulatory Class
Retrofit
Start-up Date
Total Controlled Capacity [TCCl
Total FGD System Lost
Generation Factor
Unit Location
A.   New boiler constructed
     subject to Federal New
     Source Performance Stan-
     dards (NSPS),  8/17/71.

B.   Existing boiler subject
     to State Standard that is
     more stringent than the
     NSPS, 8/17/71.

C.   Existing boiler subject
     to State Standard that is
     equal to or less stringent
     than NSPS, 8/17/71.

D.   Other (unknown, undeter-
     mined) .

FGD unit will be/was added to
an existing boiler not specifi-
cally designed to accommodate
FGD unit.

Date when initial S02 removal
began or is scheduled to
begin.

The gross rating (MW) of a
unit brought into compliance
with FGD, regardless of the
percent of flue gas treated at
the facility.  In the case of
prototype and demonstration
FGD systems, this figure will
be identical to the Equivalent
Scrubbed Capacity rather than
the gross unit rating if the
system is not meant to bring
the facility into compliance
with S02 emission standards.

The total monthly lost genera-
tion hours due to FGD train
outages divided by the total
monthly expected generation if
the FGD trains would have been
available for operation,
expressed as a percentage.

City and State listed in
mailing address.
                                C-7

-------
Unit Name
Unit Rating
     Gross
     Net w/FGD
     Net w/o FGD
Utility Name
Water Make-Up
Unit identification as  it
appears in Electrical World  -
Directory of Electrical Util-
ities, McGraw-Hill - Current
Edition - or as indicated by
utility representative  for
installations in planning
stages.
Operational - Maximum con-
tinuous gross generation
capacity in MW; Preoperational
- maximum continuous design
generation capacity in MW.

Gross unit rating less the
energy required to operate
ancillary station equipment,
inclusive of emission control
systems.

Gross unit rating less the
energy required to operate
ancillary station equipment,
exclusive of emission control
systems.

Name of corporation as it
appears in Electrical World -
Directory of Electrical Util-
ities, McGraw-Hill - Current
Edition - as space permits.

Gallons per minute of make-up
water required per MW of
capacity.
                              C-8

-------
      APPENDIX D




TABLE OF UNIT NOTATION
           D-l

-------
                                    TABLE OF UNIT NOTATION
D
I
ro
Classification
Area

Concentration




Flow





Heat Content

Length


L/G Ratio


Mass/Weight

Pressure
Temperature
Volume

English Unit
Acre
Square foot
Grains per standard
cubic foot
Parts per million
Pounds per million
Btu
Actual cubic feet
per minute
Gallons per minute
Pounds per minute
Ton per day
Ton per hour
Btu per pound

Foot
Inch
Mile
Gallons per
thousand actual
cubic feet
Pound
Ton
Inches of water
Degree Fahrenheit
Cubic feet
Acre-feet
Symbol
acre
ft2
gr/scf

ppm ,
lb/10 Btu

ft3/min
(actual)
gal/min
Ib/min
t/day
t/h
Btu/lb

ft
in
mi
gal/1000
ft3
(actual)
Ib
t
in. H20
°F
ft3
Acre- ft
Survey Report
Notation
ACRE
SQ.FT
GR/SCF

PPM
LB/MMBTU

ACFM

GPM
LB/HIN
TPD
TPd
BTU/LB

FT
IN
MI
GAL/1000ACF


LB
T
IN. H20
F
CU.F
ACRE-FT
ASTM/SI Unit
Square meter
Square meter
Grams per cubic meter

Parts per million
Nanograms per joule

Cubic meters per
second
Liters per second
Kilogram per second
Metric ton per day
Metric ton per hour
Kilojoule per
kilogram
Meter
Centimeter
Kilometer
Liters per cubic
meter

Kilogram
Megagram
Kilopascal
Degree Celsius
Cubic meter
Cubic meter
Symbol
M2
M
g/m3

ppm
ng/J

m3/s

liter/s
kg/s
M t/d
M t/h
kJ/kg

m
cm
km
liter/in3


kg
Mg
kPa
°C
m3
m
Survey Report
Notation
SQ.M
SQ.M
G/CU.M

PPM
NG/J

CU.M/S

LITER/S
KG/S
M T/D
M T/H
KJ/KG

M
CM
KM
LITER/CU.M


KG
MG
KPA
C
CU.M
CU.M

-------
 REPORT NO*
EPA-600/7-79-022c
k TITLE ANDSUBTITLE	
EPA Utility FGD Survey: December 1978 -
 January 1979
 AUTHOR(S)                      ._	
M Smith, M.Melia, T.Koger, R.McKibben, and
 J.Uihlem
                      f~     TECHNICAL REPORT DATA
                      202/755-8137)- Related reports are also in the EPA-
        CTThe report is the first in a series generated by a new computerized data
base system and the first full compilation  (not a supplement) since the December 1977
-January 1978 report. Because the next three reports are to be supplements, this
issue should be retained for reference throughout the year. This report differs from
the previous series in that the scope of design data for operating flue gas desulfuri-
zation (FGD) systems is expanded,  section formats are revised, and a new section
includes operational particulate scrubbers. The report surveys utility FGD systems
in the  U.S. It summarizes information contributed by the utility industry, process
suppliers, regulatory agencies, and consulting engineering firms. Systems are tabu-
lated alphabetically by development status (operational, under construction, or  in
planning stages), utility company, process supplier, process, waste disposal prac-
tice, and regulatory class. It presents data on system design, fuel sulfur content,
operating history, and actual performance. It includes unit by unit dependability
parameters and discusses problems and solutions associated with the boilers and
FGD systems.  Process flow diagrams and FGD system economic data are appended
to the  report. Current data show 46 operating FGD systems, 45 systems under  con-
struction, and 67 planned units. Projected 1988 FGD  capacity is about 70,000 MW.
17.
                             KEY WORDS AND DOCUMENT ANALYSIS
a.
                DESCRIPTORS
                                          b.lDENTIFIERS/OPiN ENDED TERMS
                                                               c.  COSATI Field/Group
 Pollution
 Flue Gases
 Desulfurization
 Electric Utilities
 Waste Disposal
 Boilers
                   Maintenance
                  Pollution Control
                  Stationary Sources
                  Utility Boilers
13B
21B
07A,07D

15E
13A
18. DISTRIBUTION STATEMENT

 Unlimited
                                       19. SECURITY CLASS (ThisReport)
                                       Unclassified
                                          21. NO, OF PAGES

                                              450
                                      20. SECURITY CLASS {This page I
                                       Unclassified
                                                               22. PRICE