vvEPA
United Stales      Industrial Environmental Research  EPA-600 7 79 •
Environmental Protection  Labora1          February 1979
AgtM                •  '711
EPA Industrial Boiler
FGD Survey:
Fourth  Quarter 1978

Interagency
Energy/Environment
R&D  Program Report

-------
                  RESEARCH REPORTING SERIES


Research reports of the Office of Research and Development, U.S. Environmental
Protection Agency, have been grouped into nine series These nine broad cate-
gories were established to facilitate further development and application of en-
vironmental technology. Elimination of traditional  grouping  was consciously
planned to foster technology transfer and a maximum interface in related fields.
The nine series are:

    1. Environmental Health Effects Research

    2. Environmental Protection Technology

    3. Ecological Research

    4. Environmental Monitoring

    5. Socioeconomic Environmental Studies

    6. Scientific and Technical Assessment Reports  (STAR)

    7. Interagency Energy-Environment Research and Development

    8. "Special" Reports

    9. Miscellaneous Reports

This report has been assigned to the INTERAGENCY ENERGY-ENVIRONMENT
RESEARCH AND DEVELOPMENT series. Reports m this series result from the
effort  funded  under the 17-agency Federal Energy/Environment Research and
Development Program. These studies relate to EPA's mission to protect the public
health and welfare from adverse effects of pollutants  associated with energy sys-
tems.  The goal of the Program is to assure the rapid development of domestic
energy supplies in an environmentally-compatible manner by providing the nec-
essary environmental data and control technology. Investigations include analy-
ses of the transport of energy-related pollutants and their health and ecological
effects; assessments of, and development of, control  technologies for energy
systems; and integrated assessments of a wide*range of energy-related environ-
mental issues.
                       EPA REVIEW NOTICE
This report has been reviewed by the participating Federal Agencies, and approved
for  publication. Approval does not signify that the contents necessarily reflect
the views and policies of the Government, nor does mention of trade names or
commercial products constitute endorsement or recommendation for use.

This document is available to the public through the National Technical Informa-
tion Service, Springfield, Virginia 22161.

-------
                             EPA-600/7-79-067a

                                   February 1979
EPA  Industrial  Boiler
       FGD Survey:
 Fourth  Quarter  1978
                 by

 J. Tuttle, A. Patkar, D. Welch, M. Hessling, and M. Eckstein

          PEDCo Environmental, Inc.
            11499 Chester Road
           Cincinnati, Ohio 45246
           Contract No. 68-02-2603
               Task No. 45
         Program Element No. EHE624
      EPA Project Officer: R. Michael McAdams

     Industrial Environmental Research Laboratory
       Office of Energy, Minerals, and Industry
        Research Triangle Park, NC 27711
              Prepared for

     U.S. ENVIRONMENTAL PROTECTION AGENCY
       Office of Research and Development
           Washington, DC 20460

-------
                           NOTICE





     This report (prepared by PEDCo Environmental, Inc.,



Cincinnati, Ohio under EPA Contract No. 68-02-2603, Task No.



45) is provided as an information transfer document.  Data



in this report are supplied voluntarily by industrial



representatives; flue gas desulfurization (FGD) system



designers, vendors, and suppliers; regulatory personnel; and



others.  Neither EPA nor the designated contractor warrants



the accuracy or completeness of information contained in



this report.



     Initial distribution of the report is limited to organi-



zation and individuals indicating a specific interest in the



field of FGD technology.  Additional copies of this report



and succeeding issues can be purchased from National Technical



Information Service, Springfield, Virginia  22151.
                              ii

-------
                               TABLE OF CONTENTS
SECTION                                                                                  p»r,f
      NOTICE                                                                               11

      TABLE OF CONTENTS                                                                    1U

      EXECUTIVE SUMMARY                                                                    lv

      INTRODUCTION                                                                          \

      STATUS OF INDUSTRIAL BOILERS hITH  FGO  SYSTEMS                                         3!

           A SUMMARY OF ALL  INSTALLATIONS  BY NAME, LOCATION,  START-UP  flATt,
           CURRENT STATUS, AND PAGE LOCATION FOR  ADDITIONAL  DATA.

      SUMMARY OF FGQ SYSTEMS ON  INDUSTRIAL BOILERS                                          b

           A BRIEF SUMMARY OF THE SOURCE CHARACTERISTICS,  THE CONTROL  PROCESS AC:n
           CONTROL SYSTEM SUPPLIER, AND  INFORMATION  ON  RFCENT SYSTEM
  a   SUMMARY BY VENDOR OF F6D  SYSTEMS  ON  INDUSTRIAL  BOILERS                              lh

           A LIST OF THE CONTROL  SYSTEMS SUPPLIED  BY  EACH SYSTFM VENDOR OR MANUFACTURER.

  5   OPERATIONAL F6D SYSTEMS ON  INDUSTRIAL  BOILERS                                       19

  6   UNDER CONSTRUCTION F6D SYSTEMS  ON INDUSTRIAL BOILERS                                22

  7   PLANNED F60 SYSTEMS ON INDUSTRIAL BOILERS                                            ?3

  8   SUMMARY OF DISPOSAL PRACTICES FOR FGD  SYSTEMS ON INDUSTRIAL BOILFKS                 ?U

  9   PERFORMANCE DESCRIPTION FOR OPERATIONAL  FGD  SYSTEMS ON INDUSTRIAL BOILERS           ?8

           AN IN-DEPTH DATA PRESENTATION FOR THE  OPERATIONAL CONTROL SYSTEMS.
           THIS SECTION PRESENTS  BACKGROUND  INFORMATION,  OPERATING EXPFHIFNCE,
           DESIGN DATA, DISPOSAL  PRACTICES,  AND  ANY OTHER RELEVANT INFORMATION
           AVAILABLE CONCERNING THE FGD SYSTEMS  AT THE VARIOUS INSTALLATIONS.

 10   DESIGN INFORMATION FOR UNDER CONSTRUCTION  FGD SYSTEMS ON INDUSTRIAL BOILPKS        116

           SAME AS SECTION 9, FOR CONTROL  SYSTEMS  UNDER CONSTRUCTION.

 II   DESIGN INFORMATION FOR PLANNED  FGD SYSTEMS  ON INDUSTRIAL BOIIERS                   Ub

           SAME AS SECTION 9, FOR PLANNED  CONTROL  SYSTEMS.

 12   DESCRIPTION OF INDUSTRIAL BOILER  FGO SYSTEMS NOT OPERATING                         1«9

           SAME AS SECTION 9, FOR CONTROL  SYSTEMS  HHFRE Fll« SOME RFASU*. THF SYSTfcM
           IS NOT OPERATING.

 13   INDUSTRIAL BOILER FGD COSTS                                                        157

 14   PROCESS DIAGRAMS FOR INDUSTRIAL BOILER FGO  SYSTEMS                                  17"
                                              111

-------
                                        F XFCUT IVE S

     THF FIPST Fill L-SCALE  UNITED STATES APPLICATION liF FLHF GAS  OESULFIIR I 7 AT ION (FGO) IFCHNOLORY TO

INOIISTRTAI  BOUFRS WAS  AT  THE  r,ENFRAL MOTORS PI ANT IN ST. LOUIS,  MISSOURI  HHF«E TWO FGD SYSTEMS WFKF

INSTALLFO ON Twfl  rOAL-FIWFl)  UOU.FRS IN 1"»7?.   IN THIS 4TH UUARTFH  197ft  REPORT,  13? OPERATIONAL FGD

SYSTEMS ARh DFSCRT8FD.   tHFSE  SYSTF*S ARF, CONTKOLL TNG SO? H.MJSS10NS  FROM ?<)«, BOILFHS, LOCATFD AT 39

PLANT SITFS ACROSS THF  UNITED  STATES.  FRPI SYSTEMS AT 2? PLANTS  ARE  KNOrtN  TO BE IINOEH CONSTRUCTION

OR IN SOMF STAGE  OF PLANNING.   IN ADDITION THERF AWF 7 INSTALLATIONS TNCLUDFO IN THE REPORT WHERE

FGD OPERATIONS HAVE FITHfcR BEEN TERMINATED,  INDEFINITELY SHUT DOwN,  OS  NEVER STARTED-UP.  THF TOTAL

COVERAGE OF THIS  REPORT  IS THEREFORE  f>8 INSTALLATIONS.  TABLE 1  SUMMARIZES THF  NUMBER AND SCF»» OF

THOSE SYSTEMS OPERATING, UNDER CONSTRUCTION, OR IN SOME PLANNING  PHASE.
                                               TABLE  I
                        NUMBER  AND  SCFM OF INDUSTRIAL BOILER FGD SYSTEMS


    STATUS

    OPERATIONAL

    IINOFR CONSTRUCTION

    PLANNING*

       CONTRACT AWARDED

       LETTFR OF INTFN1

       REOUFSTING/FVALUATING  BIDS

       CONSIDERING USING FGD


    TOTAL                                    61        9,109,030          172                312



    •NOTE: THFHF. ARE PROBABLY SFVERAL  FGH SYSTEMS BEING PLANNED WHICH  HAVE NOT BEFN LOCATED BY THIS
SURVEY AND THEREFORE ARE NOT  COVERED  IN THIS REPORT.
    TABLE 2 SUMMARIZES  THE PLANTS  ACCORDING TO THE YEAR OF FGD STARTUP,  AND THE SCFM CAPACITY.

    HIGHLIGHTS FROM THF. CURRENT  INDUSTRIAL BOILER SURVEY ARE GIVEN  BELOW:

CATERPILLAR TRACTOR CO. REPORTED  THE FOLLOWING ITEMS:

    EAST PEORIA - THE BOILER  CAN  OBTAIN NO MORE THAN 80* LOAD BECAUSE  FAN  CAPACITY IS NOT GREAT

    ENOUGH TO OVERCOME  AN ABNORMALLY HIGH PRESSURE OROP IN THE SCRUBBERS.   FAN AND DRAFT TESTS ARE

    BFING RUN Tfl PINPOINT THE PROBLEM AREA.




    MAPLETON - CONSTRUCTION HAS  BEEN COMPLETED ON 1HREF BOILERS  AND THE  FMC DOUBLE ALKALI FGD SVS-

    TF.MS ANO START-HP IS FxPECTFO  IN LAT£ DECEMBER OR IrARLY JANUARY 19/q.   INSTALLATION HAS JUST

    BEGUN ON TWO ADDITIONAL BOILERS SCHEDULED FOR START-UP IN 1980.
NO. OF
INSTALLA1IONS
39
11
4
0
2
5
CAPACITY
SCFM
5 , 486 , 530
1 ,235,500
177,000
0
?86,000
1,924,000
NO. OF SEPERATE
FGD SYSTEMS
132
27
5
0
4
fl
NO. OF BOILERS
CONTROLLED
206
69
7
0
14
16

-------
CATERPILLAR TRACTOR CO. (CtlNIINUEn)
    MORTON - ACCEPTANCE TESTING WAS COMPLFTFD  THIS QUARTER  ANO  AN  APPLICATION  H»S REE*  SUH'-IT TTRn
    TO THE STATE FOR A STATE PFRMTT TO OPFRATF..  PLANT PERSONNHL FFFL  THEY KILL  KFCFIVE  THE FIRST
    SUCH A PERMIT IN ILLINOIS TO BURN HIGH  SULFUR COAL IN AN  INDUSTRIAL  HOILE".
                                               TABLE    ?-
                     STARTUP  YEAR  AND SCFM  OF  INDUSTRIAL  BOILER  FGD  SYSTEMS
                                    YEAR      UMTS         SCFM
1972
1973
197U
1975
1976
1977
1978
1979
I960
1988
19«4
19»7
YEAR NOT YFT
DETERMINED
TOTAL
1
a
5
12
t>
4
7
13
3
2
1
1
2
61
64,000
MS, 300
431 ,400
1 , 480 , 300
1,024,530
?46,000
1,505,000
1,187,500
371,000
460,000
1 ,200,000
?80,000
124,000
9, 109,030
CHEVRON U.S.A., INC. REPORTED SYSTEM  AVAILABILITY  INDEX  FOR  THE  QUARTER  WAS  100X.
GENERAL MOTORS REPORTFD THAT MODIFICATIONS  WERE  MADF  TO  TWO  GM FGD  SYSTEMS:
    PARMA - NFW FRP STACKS WERE  INSTALLFD ATOP  THE  SCRUBBER  MODULES,  AND  THF  TOPS  OF  THE  MODULES
    WERE RECONSTRUCTED TO REDUCE  THE  GAS VELOCITY.  THE  ORIGINAL  STAINLESS STEEL STACKS WE«<  SADLY
    CORRODED.

    DAYTON - THE FNTOLETER "VANE  CA6F" SCRUBBERS WERE  RECONSTRUCTED DURING THE REPORT PERIOD.  THE
    INTERMEDIATE SECTIONS *FRE REMOVED, AND NEW  HASTELLOY-G  2-STASE RADIAL VANE MIST  ELIMINATORS
    WERE INSTALLED.

-------
GETTY OIL HAS BEGUN OPERATING  FIVE  OUT OF  A TOTAL OF NINF. IN-HOIISF DESIGN  FfiD  SYSTEMS.  At




GETTY'S ENHANCED OIL RECOVERY  OPERATION NFAH RAKERSF1F. LD, CALIFOHNIA.  OF  THF.  FOUR  KEMAtMnlG I'MTS




TO BE STARTED UP,  TWO  ARE  SCHEDULED TO SIAkT IN MIO-JAiMIIAWY AND Trtll  IN MI11-FF.BHIJAHY 1979.




ONE SYSTEM IS USING SODIUM HYDROXIDE SCRUBBING IN AN ATTEMPT TO EVALUATE THE PERFORMANCE  OF




CAUSTIC COMPARED TO SODA ASH AS  THE ALKALI.








THE U.S. AIR FORCE HAS  AWARDED TO AIRPOL  INDUSTRIES THE FGD SYSTEM CONTRACT FOR  THE HFAT  PLANT AT




GRISSOM AIR FORCE  BASE  IN  HUNKER HILL, INflJAMA.  THF SYSTFM WILL CONTROL 32,000  SCFM,  FOR  COAL WITH




A SULFUR CONTENT RANGING FROM  0.9 TO 1.6*,  AT A DESIGN RATE OF 1.? LHS OF  SH2/MM BUI HEAT  INPUT.









ITT RAYONIER, INC. REPORTED THAT THE BOILER ANn THE AIRPOL FGD SYSTEMS OPERATED  APPROXIMATELY 95X OF




THE PERIOD.  THE ONLY  OUTAGE DURING THE PFRIOD WAS A 3-DAY DOWNTIME  THAT WAS BOILER-RFLATEI1.









KERR-MCGEF SODA ASH PLANT,  UTILIZING A COMBUSTION EQUIPMENT ASSOCIATES RESIGN  FOR S03  REWlVAL. RE-




PORTED THAT BOTH SCRUBBERS  DEMONSTRATED IOOX RELIABILITY FUR THIS QUARTER.









MEAD PAPERBOARl) CO. REPORTED AN  AVAILABILITY INDEX VALUE OF 1001 FOR THIS  AIRPOL FGD SYSTEM  FOR THE




QUARTER.









PHILIP MORRIS, INC. is  INSTALLING A FLAKT  INC. SODIUM CARBONATE FGD  SYSTEM AT  THEIR TOBACCO




REPROCESSING PLANT IN CHESTERFIELD, VIRGINIA.  THE SYSTFM WILL INCLUDE A 6 RPM IJUENCHFR,  A 3-STAGE




FRP SPRAY TOWER, A POLYPROPYLENE CHEVRON  MIST ELIMINATOR, A SODA ASH STORAGE TANK AND  AN  OXIDATION




TOMER.  THE SCRUBBER IS DESIGNED TO HANDLE  39,000 SCFM, OR 2/3 OF THE FLUE GAS FROM A  NEW  500,000




L8/HR PULVERIZED COAL-FIRED BOILER.  THF  REMAINING 1/3 OF THE GAS WILL BE  USED FOR  REHEAT.




START-UP IS SCHEDULED  FOR  JUNE 1979.









RICKENBACKER AIR FORCF  BASE REPORTED THFIR  RESfARCH-COTTRF.LL/BAHCO SCRUBBER TO HAVE AN FED SYSTEM




AVAILABILITY INDEX OF  APPROXIMATELY 98X FOR THE QUARTER.









AT THE ST. JOE ZINC CO. FGD SYSTEM  CONSTRUCTION IS NEAHING COMHLETETION; THE BUREAU OF MINF.S CITRATE




PROCESS SYSTEM IS  NOW  SCHEDULED  TO  START-UP IN MARCH 1979.









AT THE WESTERN CORRECTIONAL INSTITUTION IN  PITTSBUPG, THE SCORE (SULF-X CONCURRENT  OXIDFS  REMOVAL)




PROCESS* DEVELOPED BY  PITTSBURG  ENVIRONMENTAL AND ENERGY SYSTEMS, INC. IS  BFING  INSTALLED.




SIMULTANEOUS REMOVAL OF S02 (90X) AND NOX  (hOX) WILL BE ACHIFVJ-0.  EMISSIONS CONTROL IS  SCHFDULEn TO




BEGIN IN MAY 1979  AND  THE  REGENERATION LOOP (ELEMENTAL SULFUR BY-PRODUCT)  IS SLATED 10 BEGIN IN THE




LATE FALL OF 1979.

-------
    OF THE MORF THAN )TO ACTIVE  (OPERATING,  UNUER  CONSTRUCTION,  MR PLANMFH)  FRO UNITS alinkFSSFn J,-i




THIS REPORT, MORE THAN HALF  AHF  BFING  USEn  Ort  SCHEDULED TO BF. USED IN ENHANCED OIL RECOVERY (Ef)H)




SITES IN CALIFORNIA.  BECAUSE  OF THf FACT  THFSt-  UNITS PREOOMINATfc  IN THIS RFPORT, A BRIFF DISCUSSION




OF THE EOR INDUSTRY FOLLOWS.




    IN 1976, THF SAN JOAQIIJN VALLFY  AIR  BASIN  PRODUCED ABOUT 0-3% OF CALIFORNIA'S CRUDE Oil OUTPUT.




EOR OPERATIONS ACCOUNTED FOR AHODT SOX (IF  THAT PRODUCTION.  ADDITIONALLY, EOR OPERATIONS  IN !H£




BASIN ACCOUNTED FOR APPROXIMATELY BOX  OF CALIFORNIA'S TOTAL EOR OPERATIONS.




    THE MOST COMMON MEANS OF PRODUCING CRUDE OIL R£LIFS ON NATURAL UNDERGROUND PRESSURE TO PUSH THE




OIL TO THE SURFACE OF A KȣLL.   IF NATURAL  PRESSURE IS LACKING, PUMPS ARE USFD TO PULL THE OIL OUT OF




AN OIL RESERVOIR.  THESE METHODS OF  PRODUCING  CRUDE  OIL ARE TEHMED PRIMARY RECOVERY.  IF WATER IS




PUMPED INTO AN OIL RESERVOIR (SECONDARY  RECOVERY), TMUDE RECOVtRY CAM HE INCREASED OR "FNHANCFO".




WHEN THE CAPABILITIES OF THP PRIMARY AND THE SECONDARY METHODS ARE EXHAUSTED, ADDITIONAL FNHANCFK




RECOVERY (TERTIARY RECOVERY) METHODS ARF CONSIDERED.   TERTIARY Oil. RECOVERY  EMPLOYS THERMAL VEANS TO




MAKE HEAVY, VISCOUS CRUDE OILS MOVE  THROUGH SAKO AND  ROCK STRATA MORE EASILY.




    TYPICALLY STEAM IS INJECTED CONTINUOUSLY TO FLOOD THE UNDERGROUND OIL RESERVOIR KITH STEAM At-0




HOT WATER.  THERE ARE CURRENTLY ABOUT  800 STEAM GENERATORS (TYPICAL STEAM QUALITY IS 80 PERCENT) IN




THE SAN JOAOUIN BASIN AND MOST OF THESE  UNITS  HAVE CAPACITIES IN THE RANGE OF 15 MM BTU/HR TO




65 MM BTU/HR.  STEAM GENERATORS IN  THIS  SIZE RANGE VARY FROM ABOUT 5,000 TO 30,000 ACFC i APPROX-




IMATELY 600 F.




     THE CALIFORNIA AIR RESOURCES BOARD  (CARS) HAS PROPOSED REGULATIONS WHICH MOULD REQUIRE THF




FOLLOWING FOR OIL-FIRED STEAM  GENERATORS:




              SOURCE              SOe EMISSION  LIMIT              NOX EMISSION LIMIT
          NFW GENERATORS                  60 PPM                         100 PPM




       EXISTING GENERATORS               ^00 PPM                         150 PPM




     THIS REPORT  ADDRESSES  IN  DETAIL FGD OPERATIONS FOR THOSE EOR PRODUCTION COMPANIES WHO HAVF




GIVEN PERMISSION.  THOSE  COMPANIES ARE AS FOLLOWS:




          BELRIDSE OIL  COMPANY




          CHANSLOR WESTERN  OIL AND DEVELOPMENT COMPANY




          CHEVRON U.S.A.,  INC.




          GETTY OIL  COMPANY




          MOBIL OIL  COMPANY




          SHELL OIL  COMPANY




          SUN PRODUCTION  COMPANY




          TENNECO OIL COMAPNY




          TFXACO, INC.




     IN SECTION 3 OF THIS REPORT  (BEGINNING ON PAGE 3) THE READER CAN FIND A DETAILED INDEX




TO INFORMATION ON THE ABOVE INSTALLATIONS.
                                                  vil

-------
                                               SFfTIflN  1

                                              INTRODUCTION

    THIS REPORT ADDRESSES  THE  APPLICATION (jF Ft HE GAS DFMILFUP J ZA T1 ON (FGn) TECHNOLOGY TO INDUSTRIAL

BOILERS.  AN INDUSTRIAL BOILER WILL  BE  OEMNEO AS A BOILER OH SIMM KFMFWATOH WHICH IS (IHFHATINK OK

SCHEDULED FOR OPERATION AT  AN  INOUSTHIAL  SITfr.  THIS IS IN CONTRAST TO A UTILITY BOILFR KHF.KFIN THf

PRIME FUNCTION IS STFAM GENERATION  AND  SUBSEQUENT CONVERSION To fcLECIHICAl  POWER FOR SALE 10 THE

PUBLIC.  THE NEED FOR SUCH  A DOCUMEM HAS ARISEN AS A RESULT OF  MOWF STRINGENT EMISSION KFGULATTliNS

DESIGNED TO REDUCE SULFUR  DIOXIDE  (SO?) EMISSIONS.  IN VIEft OF THE DEVELOPMENTAL STATUS OF FSO TFCH-

NOLOGY, EPA'S INDUSTRIAL ENVIRONMFNTAL  RESEARCH LAflORATOkY IN RESEARCH TRIANGLE PARK, NORTH CARO-

LINA, HAS ESTABLISHED THIS  PERIODICALLY UPDATED ENGINEERING APPLICATION/TNFOHPATION TRANSFER

PROGRAM FOR INDUSTRIAL USE  OF  SOS  CONTROL TECHNOLOGY.

    FIRST ISSUED  IN  DFCEMHF.R  1977  AS A  COMPREHENSIVE 900-PAGE REPORT ON S02 CONTROL SYSTEMS ON ALL

NON-UTILITY COMBUSTION AND  PROCESS  SOURCES,  THf CURRENT SERIES,   IM THE INTEREST OF ECONOMIZING OPER-

ATIONS. ADDRESSES ONLY INOUSJRIAL  BOILER  APPLICATIONS OF  F60 TECHNOLOGY.   THE FIRST ISSUE OF THIS

SERIES. ENTITLED  "EPA INDUSTRIAL BOILErt FGD  SURVEY: FIRST QUARTER 1978," PRESENTED DETAILED TECH-

NICAL INFORMATION ON INDUSTRIAL BOILER  FGD INSTALLATIONS.  THE INFORMATION WAS OBTAINED BY A

SURVEY OF PLANT PERSONNEL,  CONTROL  SYSTEM VENDORS, REGULATORY AGENCIES, AND ENGINEERING FIRMS.

    THE CURRENT REPORT REPRESENTS  AN EXPANSION OVER THE THIRD UUARTEH 1978 ISSUE WITH RESPECT TO

BOTH THF NUMBER OF INSTALLATIONS,  AND  THE INFORMATION PRESENTED FOR EACH INSTALLATION.  THE DATA

ARE GIVEN IN TWO  TYPES OF  TABLES:  ONE GIVES  SUMMARY INFORMATION; THE OTHER DETAILED INFORMATION.

SUMMARY TABLES PRESENT INFORMATION  AS FUNCTIONS OF TYPE OF CONTROL PROCESS, CONTROL SYSTEM VENDOR,

DISPOSAL TECHNIQUES  AND OPERATIONAL  STATUS (OPERATIONAL,  UNDER CONSTRUCTION, PLANNED, OR NOT OPERAT-

ING).  NUMBERS, OPERATIONAL STATUS,  AND OVERALL CAPACITY  OF THE FGD SYSTEMS ARE SUMMARIZED IN THE

EXECUTIVE SUMMARY.   DETAILED  INFORMATION  INCLUDES! CONTROL SYSTEM DESIGN PARAMETERS, OPERATING EX-

PERIENCE, ECONOMICS,  PROBLEMS  AND  SOLUTIONS, WASTE DISPOSAL TECHNIQUES, AND MAINTENANCE PRACTICES.

    THE INFORMATION  IN THIS REPORT  WILL BE PERIODICALLY UPDATE!) AND EXPANDED BY MEANS OF TELEPHONE

AND MAIL SURVEYS, AND PUBLISHED EACH QUARTER.  IN FUTURE  ISSUES, THE DATA BASE ON SELECTED PLANTS

WILL BE EXPANDED BY  ON-SITE SURVEYS.

    CERTAIN ENGINEERING SYMBOLS AND  TERMS ARE USED VERY FREOUFNTLY IN THE FIELD OF FGO TECHNOLOGY.

TABULATED BFLOW ARE  THE DEFINITIONS  OF  PERTINENT SYMBOLS  AND TERMS USED IN THIS REPORT.



  SYMBOL/TERM                                      DEFINITION
 ACF               ACTUAL CUBIC  FEET,  UNIT  OF  GAS VOLUME MEASURED AT ITS ACTUAL TEMPERATURE AND
                   PRESSURE.

 ACFM              ACTUAL CUBIC  FEET  PER  MINUTE,  UNIT OF GAS FlOw HATE MEASURED AT ITS ACTUAL
                   TEMPERATURE AND  PRESSURE

 AVAILABILITY      HOUHS THE FGD SYSTEM HAS AVAILABLE (WHETHER OPERATED OR NOT) DIVIDED BY HOURS IN
                   PERIOD, EXPRESSED  AS PERCENTAGE

 CS                CARBON STEEL

 F                 DEGREES FARENHEIT,  UNIT  OF  TEMPERATURE

-------
DEFINITIONS (CONTINUED)

  SYMBOL/TERM
                                DEFINITION
 P.O.

 FRP

 GAL

 6PM

 I.R.

 L/6


 MM

 MS

 MW(EQUIVALENT)
 OPERABILITV


 PSIG


 RELIABILITY


 9CFM




 SS

 T

 M.6.
FORCED DRAFT

FIBERGLASS-REINFORCED POLYESTER (OR PLASTIC)

GALLONS

GALLONS PER MINUTE
                 \

INDUCED DRAFT

LIOUID-TO-GAS RATIO, RECIRCULATING LIQUID FLOW DIVIDED BY THE ACTUAL GAS FLOW,
GAL/1000 ACF

MILLION (DOLLARS, GALLONS, BTU, ETC.)

MILD STEEL

2000 SCFM/MW IS THF CONVERSION FACTOR USED FOR THIS REPORT.  ALTHOUGH THERE AHF
SEVERAL METHODS IN USE FOR ARRIVING AT EQUIVALENT MM, SUCH AS LB/HR OF STEAM,
MM 8TU/HR OF HEAT INPUT, THF FACTOR MOST INFLUENTIAL IN AFFECTING EQUIPMENT
SIZING IS FLON RATE.  THIS CONVERSION ALLOWS FOR EASY COMPARISON BETWEEN THESF
INDUSTRIAL FGD SYSTEMS AND THE UTILITY FGD SYSTEMS.

HOURS THE FGD SYSTEM OPERATED DIVIDED BY BOILER OPERATING HOURS IN PERIOD,
EXPRESSED AS PERCENTAGE

POUNDS PER SQUARE INCH, UNIT OF PRESSURE, AS COMPARED TO ATMOSPHERIC PRESSURE
OF 14.7 PSI.

HOURS THE FGO SYSTEM WAS OPERATED DIVIDED BY HOURS IT MAS CALLED UPON TO OPERATE,
EXPRESSED AS PERCENTAGE

STANDARD CUBIC FEET PER MINUTE, UNIT OF GAS FLOW RATE MEASURED AT 70 F AND 1 ATM.
PRESSURE
IF THE PRESSURE IS ASSUMED TO BE ONE ATMOSPHERE, THEN THE FOLLOWING RELATION
EXISTS: SCFM = ACFMCObO * 70)/(4feO + ACTUAL TEMP)

STAINLESS STEEL

TEMPERATURE

WATER GAUGE, PRESSURE DROP EXPRESSED AS INCHES OF WATER (ATMOSPHERIC = 407 IN.)
 0/XX

 0/0
SYMBOL USED WHEN THE MONTH OF A STARTUP DATE IS NOT AVAILABLE

SYMBOL USED WHEN NEITHER THE MONTH NOR THE YEAR OF A STARTUP DATE IS AVAILABLE
    THE ENGLISH SYSTEM IS USED IN THIS REPORT.  SOME OF THE CONVERSION FIGURES BETWEEN THE ENGLISH

AND METRIC SYSTEMS AND ABBREVIATIONS ARE SHOWN BELOW:

 1 F (FOOT) = 0.3048 M£T£R

 1 T (SHORT TON)  = 0.91 METRIC TON

 1 LB (POUND) = 0.45 KILOGRAM

 1 GAL (GALLON) = 3.79 LITER

 1 BBL (BARREL) = 0.16 KILOLITER

 I SCFM = 1.58 NORMAL CUBIC METERS PER HOUR

 1 GALLON/1000 ACF = 0.135 LITEHS/NOhMAL CUBIC METER

 i BTU = o.as KCAL

    ANYONE DESIRING TO RECEIVE THE QUAHTFRLV UPDATED VERSIONS OF THIS REPORT FREE OF COST, MAY

REQUEST ADDITION OF HIS/HER NAME TO THE MAILING LIST BY CONTACTING IHE EPA PROJECT OFFICER 0« PEDCO.

-------
                                                                              STATUS TO JANUARY  1979
                                             SECTION  2
                            STATUS OF INDUSTRIAL BOILERS WITH FGD SYSTEMS
INSTALLATION NAME

ALYESKA PIPELINE SERVICE CO.
AMERICAN THREAD CO.
ARCO/PflLYMERS, INC.
ARMCO STEEL
BELRIDGE OIL CO.
BELRIDGE OIL CO.
BELRIDGE OIL CO.
8UNGE, INC.
C.A.M.(CARBIDE-AMOCO-MONSANTO)
CANTON TEXTILES
CARBORUNDUM ABRASIVES
CATERPILLAR TRACTOR CO.
CATERPILLAR TRACTOR CO.
CATERPILLAR TRACTOR CO.
CATERPILLAR TRACTOR CO.
CATERPILLAR TRACTOR CO.
CATERPILLAR TRACTOR CO.
CHANSLOR WESTERN OIL * OEV. CO
CHEVRON U.S.A. INC.
CHEVRON U.S.A. INC.
OUPONT, INC.
OUPONT, INC.
FIRESTONE TIRE AND RUBBER CO.
FMC (SODA ASH PLANT)
GENERAL MOTORS CORPORATION
GENERAL MOTORS CORPORATION
GENERAL MOTORS CORPORATION
GENERAL MOTORS CORPORATION
    LOCATION
VALDEZ, ALASKA
MARION, NORTH CAROLINA
MONACA, PENNSYLVANIA
MIODLETOWN, OHIO
MCKlTTRICK, CALIFORNIA
MCKITTRICK, CALIFORNIA
MCKlTTRICK, CALIFORNIA
CAIRO, ILLINOIS
HOUSTON, TEXAS
CANTON, GEORGIA
BUFFALO, NEW YORK
EAST PEORIA, ILLINOIS
JOLIET, ILLINOIS
MAPLETON, ILLINOIS
MAPLETON, ILLINOIS
MORTON, ILLINOIS
MOSSVILLE, ILLINOIS
BAKERSFIELD, CALIFORNIA
BAKERSFIELD, CALIFORNIA
BAKERSFIELO, CALIFORNIA
GEORGIA
TEXAS
POTTSTOWN, PENNSYLVANIA
GREEN RIVER, WYOMING
DAYTON, OHIO
PARMA, OHIO
PONTIAC, MICHIGAN
ST. LOUIS, MISSOURI
START-UP
  DATE    STATUS*
                      PAGE UUMREW+
6-77
0-73
6-8U
0-75
1-79
h-78
7-78
9-77
0-84
6-74
0-80
4-78
9-74
1-79
1-80
1-78
10-75
3-79
7-78
4-79
0-87
0-82
1-75
5-76
9-74
3-74
4-76
0-72
1
1.
?•
1*
2
1
1
.•*>
6
1*
3*
1 *
1 «
2 •
3 >
1 •
1 •
2
1
5
6 •
6 t
1 *
1 •
1 •
1 •
1 •
1 (
28 (
31(
116C
33C
118C
36 (
38 (
149C
136(
40(
137C
42(
44 (
120C
139(
46 (
48 (
122(
51 (
140(
14K
142C
53(
57(
59 (
62 (
69 {
7I(
6,
6,
6,
ft,
6,
6,
6,
7,
7,
7,
7,
7,
7,
7,
8,
8,
8,
8,
8,
e.
8,
9,
9,
9,
9,
9,
9,
9,
16,
18,
16,
18,
16,
17,
18,
16,
18,
16,
16,
17,
18,
17,
19
19
22
19
22
19
19
0
23
19
23
19
19
22
17,23
18,
17,
17,
18,
18,
18,
18,
17,
17,
16,
17,
17,
19
19
22
19
23
23
,27,
,25,
,24,
,25,
, 0,
,27,
,27,
,24,
,27,
,25,
,27,
,24,
,24,
.24,
,24,
,24,
,24,
,24,
,26,
,27,
,24,
23,24,
19
19
20
20
20
,24,
,25,
,25,
,24,
,24,
16,20,25,
IS7)
157)
157)
157)
157)
15B)
158)
158)
0)
158)
0)
159)
159)
159)
b)
159)
159)
16U)
16U)
0)
U)
0)
160)
160)
161)
161)
161)
161)
             * STATUS COOES
               0 - STATUS NOT DEFINED               5 - PLANNED-SEOUESTING/EVALUATING BIOS
               1 - OPERATIONAL                      6 - PLANNED-CONSIDERING S02 CONTROLS
               2 - CONSTRUCTIONAL                   7 - TERMINATED
               3 - PLANNED-CONTRACT AWARDED         8 - INDEFINITELY SfcUT DQ*N
               4 - PLANNED-LETTER OF INTFNT SIGNED  9 - NEVER STARTEO-UP
             * FOR COMPLETE INFORMATION ON IHf INDICA1ED FGD SYSTEM REFER TO FIRSI PAGF LISTEP.
               THE INSTALLATION APPEARS IN OTHER SUMMARY SECTIONS ON THE PAGES IN PARENTHESES.
               A ZERO INDICATES THAT INFORMATION IS NOT AVAILABLE FOR AN INSTALLATION IN A
               PARTICULAR SECTION SEARCHED HY THE COMPUTER SYSTEM.  SECTION 14 PROVIDES PHOCFSS
               DIAGRAMS FOR SEVERAL INSTALLATIONS: AN INDEX TO THE FIGURES IS IN SECURd. 14.

-------
                                                                              STATUS TO JANUARY  1979
                                       SECTION  2
                            STATUS OF INDUSTRIAL TOILERS WITH FGO SYSTEMS
INSTALLATION NAME

GENERAL MOTORS CORPORATION
GEORGIA-PACIFIC PAPER CO.
GETTY OIL COMPANY
GETTY OIL COMPANY
GETTY OIL COMPANY
GREAT SOUTHERN PAPER CO.
GREAT WESTF.RN SUGAR
GREAT WESTERN SUGAR
GREAT WESTERN SUGAR
GREAT WESTFRN SUGAR
GREAT WESTFHN SUGAR
GREAT WESTERN SUGAR
GREAT WESTERN SUGAR
GRISSOM AIR FORCE BASE
HARRIS MINING CO.
ITT RAYONIER. INC.
KERR-MCGEE CHEMICAL CORP.
HEAD PAPFRBIIARn CO.
MINN-DAK FARMER'S CO-OPERATIVE
MOBIL OIL COMPANY
MOBIL nit COMPANY
NEKOOSA PAPERS, INC.
NORTHERN OHIO SUGAR COMPANY
NORTHERN OHIO SUGAR COMPANY
PHILLIP MORRIS, INC.
RICKENRACKER AIR FORCE BASF.
SHELL OIL COMPANY
SHELL OIL COMPANY
    LOCATION
STAHT-UP
  DATE    STATUS*
TUNOWANDA, NEr. YORK
CROSSETT. ARKANSAS
8AKERSFIELH, CALIFORNIA
BAKERSFIELO, CALIFORNIA
BAKERSFIELO, CALIFORNIA
CEDAR SPRINGS, GFORGTA
HILLINGS, MONTANA
FORT MORGAN, COLORADO
GERING, NEBRASKA
GREELEY, COLORADO
I.ONGMONT, COLORADO
LOVELANO, COLORADO
SCOTTS 8LUFF, NEBRASKA
BUNKER HILL, INDIANA
SPRUCE PINE, NORTH CAROLINA
FERNANOINA BEACH, FLORIDA
TRONA, CALIFORNIA
STEVENSON, ALABAMA
WAHPETON, NORTH DAKOTA
BUTTONWILLOM, CALIFORNIA
SAN ARDO, CALIFORNIA
ASHDOWN, ARKANSAS
FINDLAY, OHIO
FRFEMONT, OHIO
CHESTERFIELD, VIRGINIA
COLUM8US, OHIO
RAKERSFIEL", CALIFORNIA
TAFT, CALIFORNIA
6-7S
7-75
6-77
12-7«
1-79
0-7->
10-77
10-76
10-75
10-75
10-73
10-73
10-75
9-79
0-73
0-75
6-78
0-75
6-77
2-79
0-74
2-76
10-74
10-75
6-79
0- 0
0- 0
1*
1 »
1
1
2
1 •
1 fr
1*
1*
1"
-*—
l»
f
<**
8«
^J-
1 »
1
!•
2
1
1»
->—
1 9
2*
6
6
     PAGE NUMBER*

 73(10,17,20,30,161)
 75(10,16,20,35,162)
 77(10,17,20,25,162)
 AQ(10,la,20,26,162)
124(10,18,22,26,162)
 62(10,16,20,26,163)
 &4(11,17,20,26,163)
 85(11,17,20,26,163)
 86(11,17,20,26,163)
 87(11,17,20,26,163)
150(11,17,.0,26,164)-
 88(11,17,21,26,164)
 89(11,17,21,26,164)
143(12,16,23,24,  0)
151(12,18, 0,27,164)
 90(12,16,21,26,164)
 92(12,16,21,25,165)
 95(12,16,21,24,165)
 98(12,13,21,27,165)
125(12,17,22,?5,166)
100(13,18,21,25,166)
102(13,16,21,24,166)
152(13,17, 0,26,166)
105(13,17,21,26.167)
127(13,16,22, 0,167)
106(13,18,21,25,167)
145(13,18,23,27,  tt)
146(14,18,27,27,  0)
             * STATUS COOES
               0 - STATUS NOT DEFINED               5 - PLANNED-REOUESTING/EVALUATING BIDS
               I - OPERATIONAL                      6 - PLANNED-CONSIDERING S02 CONTROLS
               2 - CONSTRUCTIONAL   .                7 - TERMINATED
               3 - PLANNED-CONTRACT AnARDED         8 - INDF.FINITELY SHUT DOWN
               4 - PLANNED-LETTER OF INTENT SIGNED  9 - NEVER STARTED-UP
             * FOB COMPLETE INFORMATION on THE INDICATED FGD SYSTEM REFER TO FIRST PAGE LISTED.
               THE INSTALLATION APPEARS IK OTHER SUMMARY SECTIONS ON THE PAGES IN PARENTHESES.
               A ZERO INDICATES THAT INFORMATION IS NOT AVAILABLE FOR AN INSTALLATION IN A
               PARTICULAR SECTION SEARCHED BY THE COMPUTE* SYSTEM.  SECTION 14 PROVIDES PROCESS
               DIAGRAMS FOR SEVERAL INSTALLATIONS: AN INDEX TO THE FIGURES is IN SECTION ia.

-------
                                                                               STATUS  rn JAMIAKIT  IO?Q
                                       SFCTION  2  (CONTINUED)
                            STATUS r»F  INOUSTR1AL HOILERS  WITH FUO  SYSTEMS
INSTALLATION NAMF

SHELLER GL08JF CORP.
ST. JOE ZINC co.
ST. REGIS PAPER CO.
SUN PRODUCTION COMPANY
SUN PRODUCTION COMPANY
TENNECO OIL CO.
TEXACO INCORPORATED
TEXACO INCORPORATED
TEXASGULF
TRANSCO TEXTILES. INC.
U.S. GYPSUM CORP.
WESTERN CORRECTIONAL INST,
    LOCATION
NORFOLK, VIRGINIA
MONACA, PENNSYLVANIA
CANTONMENT. FLORIDA
FELLOWS* CALIFORNIA
OILDALE, CALIFORNIA
GREEN RIVER, WYOMING
SAN AROO, CALIFORNIA
SAN AROO, CALIFORNIA
GRANGER, WYOMING
AUGUSTA, GEORGIA
OAKMONT, PENNSYLVANIA
PITTSBURG, PENNSYLVANIA
START-UP
  HATE    STATUS*
                      PAGE NUMBFH+
  0-75     •*«»  I53(ia,1rt, 0,27,167)
  3-79      ?•   129(14,16,22,25,168)
  0-73      1    110(14,16,21,27,168)
  4-79      2    132(14,16,22,25,168)
  4-79      2    133(10,16,22,25,168)
  1-82      5»  147(10,18,23,25,  0)
 11-73      1    112(15,16,21,27,169)
  3-79      2    134(15,16,22,27,169)
  9-76      !•   114(15,18,21.27,169)
  3-75      8    155(15,17, 0,26,169)
  0- 0     •*>•  156(15,16, 0,24,169)
 11-79      3«   148(15,18,23,  0,  0)
             * STATUS COOES
               0 - STATUS NOT DEFINED
               1 - OPERATIONAL
               2 - CONSTRUCTIONAL
               3 - PLANNED-CONTRACT AWARDED
                    5 - PLANNED-REQUESTING/EVALUATING BIOS
                    6 - PLANNED-CONSIDERING 302 CONTROLS
                    7 - TERMINATED.
                    8 - INDEFINITELY SHUT DOHN
               a - PLANNED-LETTER OF INTENT SIGNED  « - NEVER STARTED-UP
             + FOR COMPLETE INFORMATION ON THE INDICATED FGD SYSTEM REFER TO FIRST PAGE LISTED.
               THE INSTALLATION APPEARS IN OTHER SUMMARY SECTIONS ON THE PAGES IN PARENTHESES.
               A IF HO INDICATES THAT INFORMATION IS NOT AVAILABLE FOR AN INSTALLATION IN A
               PARTICULAR SECTION SEARCHED BY THE COMPUTER SYSTEM.  SECTION 1« PROVIDES PROCESS
               DIAGRAMS FOR SEVERAL INSTALLATIONS: AN INDEX TO THE FIGURES IS IN SECTION 14.

-------
                                                                               STATUS TO JANUARY 197«»
                                              SECTION   ?

                              SUMMARY OF  FGD SYSTEMS ON INDUSTWIAl  BUTLERS
   COMPANY  INFORMATION
                                                       BACKGKOUNI)  AND  SUMMARY  OF  RF.CF.NT OPEHATIONS
   ALYESKA PIPELINE SERVICE CO.
   VALDEZ, ALASKA
   FMC  ENVIRONMENTAL EOIIIPMFNT
   OIL  CO.031 - O.U SULFUR)
   SO,000 SCFM  (DESIGN MAXIMUM)
   START-UP    6/77
   SODIUM HYDROXIDE SCRUBBING
   STATUS - OPERATIONAL
                                                    *HK&0« THF ALEYSKA FGO SYSTEM IS UNimiF  IN THAT  IT
                                                    WAS NOT INSTALLED PRIMARILY FOR CONTKOL  »F FMIS-
                                                    StONS, HUT TO TKEAT GAS HSFO IN THF OIL  STORAGE
                                                    TANKS.
                                                    *OTH QTR 7«: FRD OPERATIONS FOR THIS REPORT PERIOD
                                                    WERE PKUBLF.M FREE.  C*CLOHEXYLAMINE IS NO* HEING
                                                    SPRAYED INTO THE FLUF GAS EXITING THF SCRUBBER.
                                                    THIS HAIStS THE PH (IF THE CARRY-OVFK BETWEEN  h ANO
                                                    7 ANO HAS APPARENTLY STOPPED THE CORROSION INSIDE
                                                    THF MILD STEEL OIL STORAGE TANKS.
   AMERICAN THREAD CO.
   MARION,  NORTH CAROLINA
   N.W.  SLY MANUFACTURING CO.
   COAL  (1  - 1.5* SULFUR)
   18,500 SCFM (TOTAL - 2 BOILERS)
   START-UP    0/73
   CAUSTIC  WASTE STREAM
   STATUS - OPERATIONAL
                                                    *BKGD! AMERICAN THREAD IN MAftlON, NO*1H CANdLINA
                                                    IISFS A CAUSTIC SCRUBBING APPROACH TO CONTROL
                                                    PARTICIPATE AND S02 EMISSIONS FKO^ two COAL-FIRED
                                                    BOILERS.
                                                    • «TH OTR 7«: THE PLANT KFPORTEO NO IIPEKATING
                                                    PROBLEMS CONCERNING THE *ECIRCULAIION TANKS OH
                                                    PUMPS.  PATCH-UP WORK ON IHE FAN ROTOR LINING  AND
                                                    REPLACEMENT OF a SPRAY NOZZLFS CAUSED TWO OAYS  OF
                                                    DOWNTIME.
J
ARCO/POLYMERS. INC.
HONACA, PENNSYLVANIA
FMC ENVIRONMENTAL EQUIPMENT
COAL (3.OX SULFUR)
236,000 SCFM  (TOTAL - 3 BOILERS)
START-UP    6/80
DOUBLE ALKALI (CONCENTRATED)
STATUS - CONSTRUCTION
•BKGD: AKCO/PULYMEWS HAS AWARDED A CONTRACT  TO  FMC
ENVIRONMENTAL EQUIPMENT DIVISION FOR A IJOUBLF
ALKALI FGO SYSTEM.  THF SYSTEM WILL CONSIST  OF  A
SEPARATE SCRUBBER TRAIN FOR EACH OF THF THREF
IDENTICAL BOILEWS.  EACH ABSORBER MODULE WILL
HAVE FOUR DISC-AND-OONUT TRAYS AND BF FOLLOWED
BY A CHEVRON MIST ELIMINATOR.
*OTH OTH 78: CONSTRUCTION OF THF FGD SYSTEM  BEGAN
IN SEPTEMBER 1"»78.
 4
ARMCO STEEL
MIDDLETONN, OHIO
KOCH ENGINEERING
COAL CO.8* SULFUR)
84,000 SCFM (TOTAL - 2 BOILERS)
START-UP    0/75
LIME SCRUBBING
STATUS - OPERATIONAL
•BKGO: THIS CONTROL SYSTEM SERVES T*0 MULTI-RETORT
UNDERFEED STOKER, COAL-FIRED BOILERS EACH WITH
A CAPACITY OF 100,000 LBS/HR STEAM.
»«TH OTR 78: ABRASION IS A CONTINUING PROBLEM.
FIBERGLASS PIPING HAS BEFN INSTALLED IN SOME
LOCATIONS.  NO OTHER INFORMATION HAS BEEN MADF
AVAILABLE DUE TO THE POSSIBILITY OF LITIGATION
           NEW EMISSION STANDARDS.
   BELRIOGE OIL CO.
   MCKITTRICK, CALIFORNIA
   HEATER TECHNOLOGY
   OIL (1.11 SULFUR)
   12,000 SCFM (1 BOILER)
   START-UP    6/78
   SODIUM HYDROXIDE SCRUBBING
   STATUS - OPERATIONAL
                                                    «HKGO: BELRIOGE IS UTILIZING A HEATER  TECHNOLOGY
                                                    FGO SYSTEM TO CONTROL 802 EMISSIONS  FROM  A  SMALL
                                                    OIL-FIRED H.IX SULFUR) STEAM GENERATOR AT  AN FN-
                                                    HANCFO OIL RECOVERY SITE.
                                                    •«TH QTH 78: AN AVAILABILITY OF  89X  WAS
                                                    DEMONSTRATED THIS (JUARTER.  SEVFRF VIBRATIONS IN
                                                    THE RECIRCULATION PUMP CAUSED THE RECIHCULATION
                                                    PIPING TO FAIL.  CAUSTIC LINE LEAKS  WERE  REPAIRED.
   BELMIDGE OTL CO.
   MCKITTRICK, CALIFORNIA
   THEHMOTICS INC.
   CRUDE OIL (1.1X SULFUR)
   12,000 SCFM
   START-UP    7/78
   SODIUM HYDROXIDE SCRUBBING
   STATUS - OPF.HATIONAL
                                                    *BKGO: BELRIDGE IS UTILIZING A  IHERMOIICS,  INC.
                                                    FGD SYSTFN TO CONTROL 802 EMISSIONS FROM  A  SMALL
                                                    OIL-FIRED ci.ix SULFUH) STEAM GENERATOR AT  THE
                                                    MCKITTRICK ENHANCED OIL RECOVERY SITF.
                                                    *«TH UTR 78: DURING THIS QUARTER, THF SCRUBBER
                                                    EXHIBITED AN AVAILABILITY INDEX OF 9H.
                                                    FLECTHICAL MALFUNCTIONS AND A LEAK IN THF CAUSTIC
                                                    FEFO LINE WERE MAJOR PROBLEMS.  A SEAL ON THE
                                                    RECI»CMLATION PUMP RFQUIRFD REPLACEMENT.
   BELRIDGE OTL CO.
   MCKITTRICK, CALIFORNIA
   C-E NATCO
   CRUDE OIL (1.1X SULFUR)
   12,000 SCFM
   START-UP    1/79
   SODIUM HYDROXIDE SCRUBBING
   STATUS - CONSTRUCTION
                                                    *«TH UTR 78: CONSTRUCT 10* OF A C-E NATCO  FKD
                                                    SYSTEM INSTALLED ON A  SMALl !>IL-FI»ED STFAM BFN£R-
                                                    ATOR, IS NFA31NG COMPLETION.  THF ORIGINAL START-
                                                    UP DATE OF NOVEMBER 1
-------
                                                                             STATUS  TO  JANUARY  I979
                                     SECTION   ?  (CONTINUED)

                           SUMMARY OF FGD  SYSTEMS  ON  INDUSTRIAL  BOILERS
COMPANY INFORMATION
                                                     BACKGROUND  AND  SUMMARY  OF  RECENT  OPERATIONS
BUN6E, INC.
CAIRO, ILLINOIS
DRAVO CORP./NAT'L LIME ASS'N
COAL (3X SULFUR)
44,000 SCFM (TOTAL - 2 BOILERS)
START-UP    .9/77
LIME SCRUBBING
STATUS - INDEFINITELY SHUT DOWN
*BKGf>: HUNGE PURCHASED THIS LIME SYSTEM FOR TEST-
ING PURPOSES.  THE PLANT RFPOHTS THAT THE LFWIS
SCRUBBER, A HORIZONTAL ROTARY SCRUBBP* *I1H
INTERNAL CHAINS, PERFORMED WELL OURII»C THF TEST,
EFFECTING 94Z 802 CONTROL.
*4TH (1TK 7fl: BUNGE IS STILL FIRING LOW SULFUR
(0.9X) COAL ANO HAS NO PLANS TO HEIl'SF THF SYSTEM.
C.A.M.(CARBIDE-AMOCO-MONSANTO)
HOUSTON, TEXAS
VENDOR NOT YET SELECTED
FUEL NOT YET SELECTED
1,200,000 SCFM (1 BOILER)
START-UP    0/84
PROCESS NOT YET SELECTED
STATUS - PLANNED-CONSIDERING S02 CONTROL
*BKGD: UNION CARBIDE, AMOCO, AND MONSANTO HAVE
ENTERED INTO A JOINT VENTURE (C.A.C.) WHICH WILL
PRODUCE 3,000,000 LB/HH STEAM FOR PROCESS USE AMD
100 MW ELECTRICITY TO THE LOCAL UTILITY GRID.
«4TH UTH 78: AFTER THE SELECTION OF A CONTROL
SYSTEM IN EARLY 1979, CONSTRUCTION WILL START
EARLY IN 1980 WITH SCHEDULED COMPLETION IN 1980.
CANTON TEXTILES
CANTON, GEORGIA
FMC ENVIRONMENTAL EQUIPMENT
COAL (O.BX SULFUR)
25,000 SCFM (1 BOILER)
START-UP    6/74
CAUSTIC HASTE STREAM
STATUS - OPERATIONAL
•BKGO: AT CANTON TEXTILES THE CONTROL SYSTFM CON-
SISTS OF AN FMC MEDIUM ENERGY VENTURl SCRUHBER AND
UTILIZES A CAUSTIC WASTE STREAM FOR SOS REMOVAL.
THE UNIT HAS BEEN IN OPERATION SINCE JUNE 1974.
*4TH OTR 78: THE PLANT REPORTED THAT COAL FIRING
RESUMED IN MID-OCTOBER 1978.  THE BUILD-UP (IF FLY-
ASH IN THE SCRUBBER CAUSED 10 HOURS DOWNTIME.  THE
SCRUBBER OPERATED AT A 99+X RELIABILITY INDEX.
CARBORUNDUM ABRASIVES
BUFFALO, NEW YORK
CARBORUNDUM ENVIR. SYS. LTD.
COAL (2.2X SULFUR)
30,000 SCFM (TOTAL - 2 BOILERS)
START-UP    0/80
LIME SCRUBBING
STATUS - PLANNED-CONTRACT AWARDED
*BKGD: THE CARBORUNDUM FGD SYSTEM CONSISTS OF A
VENTURl FOR PARTICULATE CONTROL FOLLOWED BY A SIX-
STAGE SPRAY TOWER.  IN 1975 THE VENTURl WAS PUT
INTO SERVICE USING WATER ONLY.  THF HIGH CHLORIDFS
CONTENT OF THE FLUE GAS CAUSED SERIOUS CORROSION
PROBLEMS, AND BOTH THE VENTURl AND THE SPRAY TOWER
WILL BE REPLACED BEFORE START-UP OF THE COMPLETE
LIME SCRUBBING SYSTEM IN 1980.  THE NEW VENTURl
AND SPRAY TOWER WILL BE MADE OF HASTELLOY-C
AND FRP, RESPECTIVELY.
CATERPILLAR TRACTOR CO.
EAST PEORIA, ILLINOIS
FMC ENVIRONMENTAL EQUIPMENT
COAL (3.21 SULFUR)
210,000 SCFM.(TOTAL - 4 BOILERS)
START-UP    4/78
DOUBLE ALKALI (CONCENTRATED)
STATUS - OPERATIONAL
•BKGO: START-UP OCCURRED IN APRIL i9?s.  FGD
OPERATIONS PROCEEDED FOR 30 DAYS BEFORE BOILER
PLANT SHUTDOWN FOR THE SUMMER.  AN ABNORMALLY HIGH
PRESSURE DROP THROUGH THE SCRUBBERS IS RESTRICTING
THE BOILERS TO ABOUT 80X OF THEIR CAPACITY.
*4TH UTtJ 78: FAN AND DRAFT TESTS WERE RUN  IN DE-
CEMBER TO PINPOINT THE LOCATION OF THE HIGH PRES-
SURE DROP.  THIS FURTHER DELAYED EMISSION  TESTS.
CATERPILLAR TRACTOR co.
JOLIET, ILLINOIS
ZURN INDUSTRIES
COAL (3.2X SULFUR)
67,000 SCFM (TOTAL - 2 BOILERS)
START-UP    9/74
DOUBLE ALKALI (DILUTE)
STATUS - OPERATIONAL
*OKGD: THt FGD SYSTEH CONSISTS OF AN  INDEPENDENT
SCRUBBING TRAIN ON EACH OF TWO COAL-FIRFD BUILERS.
•4TH OTR 7ft: FILTER CLOTH WEAR CONTINUES TO BE A    +
PROBLEM.  THE HASTELLOY-C S02 PROBES  REQUIRE CON- V
TINUING MAINTENANCE.  FLYASH ACCUMULATION IN THE
BOTTOMS OF THE GUILLOTINE DAMPERS IS  STILL A
PROBLEM.
CATERPILLAR TRACTOR CU.
MAPLETON, ILLINOIS
FMC ENVIRONMENTAL EQUIPMENT
COAL (3.2X SULFUR)
131,000 SCFM  (TOTAL - 3 BOILERS)
START-UP    1/79
DOUBLE ALKALI  (CONCENTRATED)
STATUS - CONSTRUCTION
•BKGO: AT THE CATERPILLAR MAPLETON PLANT, FMC CON-
CENTRATED MODE DUAL ALKALI TECHNOLOGY WILL BE
UTILIZED TO CONTROL 802 EMISSIONS.
•4TH QTR 78: THREE SCRUBBERS ARE SLATED FOR START-
UP IN JANUARY 1979.  DELAY OF THE START-UP DATE
FROM OCTOBER 1978 WAS A RESULT OF CONSTRUCTION
ACTIVITY AND NOT THE INSTALLATION OF SPECIAL
DESIGN MODIFICATIONS.

-------
                                                                            STATUS  10 JANUARY  1979
                                     SECTION  ?  (CONTINUED)

                           SUMMARY OF FGI) SYSTEMS ON  INDUSTRIAL «OTLFRS
COMPANY INFORMATION
                                                    BACKGROUND AND SUMMARY OF RECENT OPERATIONS
CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS
FMC ENVIRONMENTAL EUUIPMENT
COAL (3.21 SULFUR)
105,000 SCFM (TOTAL - 2 BOILFRS)
START-UP    I/BO
DOUBLE ALKALI (CONCENTRATED)
STATUS - PLANNED-CONTRACT AWARDED
*«TH QTH ye: AT THE MAPLETON PLANT, AN ADDITIONAL
? NEW BOILERS ARE PLANNED FOR START-UP IN THE
EARLY 1980'S.  INSTALLATION FOR THESF TwO ARE
JUST NOW BEGINNING.  THEY KILL EACH HE EOUIPPED
WITH FMC DOUBLE ALKALAI FGO SYSTEMS.  THEY WILL
SHARE REGENERATION AND SLUDGE HANDLING FACILITIES
WITH THE OTHER THREE FRD SYSTEMS AT THIS SITE.
CATERPILLAR TRACTOR CO.
MORTON, ILLINOIS
ZURN INDUSTRIES
COAL (3.21 SULFUR)
38,000 SCFM (TOTAL - f BOILERS)
START-UP    1/78
DOUBLE ALKALI (DILUTE)
STATUS - OPERATIONAL
*BKGD: THE CATERPILLAR MORTON PLANT UTILIZES ZURN
INDUSTRIES' DILUTE MODE DOUBLE ALKALI TECHNOLOGY
TO CONTROL EMISSIONS FRO* THE STEAM PLANT.
««TH QTK 78: THE PUFFING PROBLEM HAS BEEN SOLVED
BY MODIFYING THE INTERNALS OF THE SCRUBBERS.  I>H
IS SAMPLED HOURLY WITH MULTIBAND LITMUS PAPER.
ACCEPTANCE TESTING HAS BEEN COMPLETED AND AN
APPLICATION HAS BEEN SUBMITTED TO THE STATE FOR A
PERMIT TO OPERATE.
CATERPILLAR TRACTOR CO.
MOSSVILLF, ILLINOIS
FMC ENVIRONMENTAL EQUIPMENT
COAL (3.22 SULFUR)
140,000 SCFM (TOTAL - « BOILERS)
START-UP   10/75
DOUBLE ALKALI (CONCENTRATED)
STATUS - OPERATIONAL
*BKGDS THt CATERPILLAR MOSSVILLE PLANT HAS UTIL-
IZED FMC CONCENTRATED MODE FGO SYSTEM EACH HEATING
SEASON SINCE OCTOBER 1975.  THERE ARE FOUR COAL-
FIRED BOILERS, EACH POSSESSING A SEPARATE SCRUB-
BING TRAIN.
*4TH OTR 7fl: EROSION OF VALVES, FITTINGS, LININGS,
PUMPS, FANS AND SCRUBBER NOZZLES IS A SIGNIFICANT
PROBLEM.  AN EMISSIONS TEST IS SCHEDULED FOR LATE
JANUARY OR EARLY FEBRUARY.
CHANSLOR WFSTERN OIL * OEV. CO
BAKERSFIELO, CALIFORNIA
FMC ENVIRONMENTAL EQUIPMENT
OIL (1.51 SULFUR)
70,000 SCFM (TOTAL - 8 BOILERS)
START-UP    3/79
DOUBLE ALKALI (CONCENTRATED)
STATUS - CONSTRUCTION
*BKGD: CHANSLOR WESTERN HAS PURCHASED A DOUBLE
ALKALI FGO SYSTEM FROM FMC.
*4TH RTK 78: CONSTRUCTION IS HEARING COMPLETION,
BUT THE ORIGINAL START-UP SCHEDULED FOR DECEMBER
1978 HAS BEEN EXTENDED TO MARCH 1979 DUE TO
ADDITIONAL ELECTRICAL WORK AND EQUIPMENT INSTAL-
LATION.
CHEVRON U.S.A. INC.
BAKERSFIELD, CALIFORNIA
KOCH ENGINEERING
OIL (1.1* SULFUR)
248,000 SCFM (TOTAL - 18 BOILERS)
START-UP    7/78
SODIUM CARBONATE SCRUBBING
STATUS - OPERATIONAL
•BKGDS CHEVRON U.S.A. UTILIZES THREE KOCH ENGINE-
ERING ABSORBERS TO REMOVE S02 FROM THE FLUE GAS OF
EIGHTEEN BOILERS.  THE SYSTEMS ARE DESIGNED TO
REDUCE 302 EMISSIONS TO LESS THAN 70 PPM.
*4TH OTR 78: THE FGO SYSTEM OPERATED PROBLEM-FREE
DURING THE QUARTER DEMONSTRATING AN AVAILABILITY
INDEX OF 100X.
CHEVRON U.S.A. INC.
BAKERSFIELD, CALIFORNIA
KOCH ENGINEERING
OIL (1.1* SULFUR)
146,000 SCFM (TOTAL - 12 BOILERS)
START-UP    4/79
SODIUM CARBONATE SCRUBBING
STATUS - PLANNEO-REOUESTING/FVALUATING BIDS
««TH OTR 78: CHEVRON U.S.A. IS PLANNING TO INSTALL
TWO MORE FGO SYSTEMS AT THE BAKERSFIELD OIL SITE.
THESE WILL BE ONCE-THROUGH, SODIUM CARBONATE
SCRUBBING SYSTEMS AND ARE SCHEDULED TO GO ON-
STREAM BY APRIL 1979.  A CONTRACT HAS BEEN AWARDED
TO KOCH ENGINEERING FOR THE DESIGN AND INSTALLA-
TION OF THE TWO SYSTEMS.  CONSTRUCTION IS SCHED-
ULED TO BEGIN IN JANUARY 1979.
OUPONT, INC.
GEORGIA
VENDOR NOT YET SELECTED
COAL <1.5* SULFUR)
280,000 SCFM (TOTAL - ? BOILERS)
START-UP    0/8*7
DOUBLE ALKALI
STATUS - PLANNED-CONSIDERING 502 CONTROL
*3KD UTK 78: DUPONT ANNOUNCED PLANS TO ERECT A
COAL-FIRED BOILER AT AN AS YET UNSPECIFIED SITE TN
GEORGIA.  THE COMPANY HAS DECIDED UPON A.DOUBLE
ALKALI FGD STRATEGY TO CONTROL S02 EMISSIONS FROM
3 COAL-FIRED BOILERS.  START-UP IS SLATED FOR
1987.

-------
                                     SFCTIOM  3  (CONTINUED)

                           SUMMARY OF FRD SYSTEMS OK  INDUSTRIAL  BORERS
                                                                             STATUS  TH JiK'ilARV  197°
COMPANY INFORMATION
                                                    BACKGROUND  AND  SUMMARY  OF  RECENT  OPERATIONS
DUPONT. INC.
TEXAS
VENDOR NOT YFT SELFCTE1
COAL (0.5X SULFUR)
320,000 SCFM (TOTAL - 2 80ILFRS)
STAHT-IIP    0/82
LIHESTONF SCRUBBING
STATUS - PLANNED-CONSIDERING S02 CONTROL
• 3RD (JTH 7fi: DUPONf ANNOUNCED PLANS TO ERECT A
COAL-FIRED BOILER AT AN AS YET UNSPECIFIED SITF IN
TEXAS.  THE COMPANY HAS DECIDED UPON A LIMESTONE
FGO STRATEGY TO CONTROL SO? EMISSIONS FROf ? rOAl.-
FIRED BOILERS.  START-UP is SLATED FOR 1982.
FIRESTONE TIRE ANO RUBBER CO.
POTTSTOWN, PENNSYLVANIA
FMC ENVIRONMFNTAL EQUIPMENT
COAL (2.5 - 3.OX SULFUR)
8070 SCFM (13,000 ACFM d 300 F)
START-UP    1/75
OOUBLt ALKALI (CONCENTRATED)
STATUS - OPERATIONAL
*BKGD: THE FGD SYSTEM AT FIRESTONE-POTTSTOWN
CONSISTS OF AN FMC OOUHLf ALKALI DUAL THROAT
VENTURI SC*U8BFR.  THIS CONTROL SYSTEM «AS BUILT
AS A DEMONSTRATION PROJECT FUNDED BY FIRESTONE.
*OTH UTR 78: THE SYSTEM OPERATED *ITH A RELIABIL-
ITY INDEX VALUE OF 93.7X DURING THE PERIOD.
A BROKEN BELT ON THE RECIRCULATION PUMP CAUSED
20 HOURS DOWNTIME.
FMC (SODA ASH PLANT)
GREEN RIVER, WYOMING
FMC ENVIRONMENTAL EQUIPMENT
COAL (IX SULFUR)
446,000 SCFM (TOTAL - 2 BOILERS)
START-UP    5/76
SODIUM CARBONATE SCRUBBING
STATUS - OPERATIONAL
*BKGO: THE FGO SYSTEM CONSISTS OF TwO FMC SODIUM
SCRUBBING UNITS TO REMOVE SULFUR DIOXIDE ANO PART-
ICULATE MATTER FROM THE FLUE GAS OF TWO BOILERS.
*4TH OTR 78: THE PLANT REPORTED NO MAJOR OPERATING
PROBLEMS.  DURING THIS REPORT PERIOD THE INDEX    t
VALUF OF THE FGD SYSTEM WAS REPORTED TO BE      V
CLOSF TO 100X.
GENERAL MOTORS CORPORATION
DAYTON, OHIO
ENTOLETER, INC.
COAL(0.7X - 2.OX SULFUR)
36,000 SCFM (TOTAL - 2 BOILERS)
START-UP    9/74
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
•BKGO: THE FGD SYSTEM CONSISTS OF TWO ENTOLETER
SODIUM HYDROXIDE SCRUBBING UNITS TO CONTROL EMIS-
SIONS FROM TWO 60,000 LB/HR COAL-FIRED BOILERS.  /
*4TH OTR 78: NEw HASTELLOY-G MIST ELIMINATORS   V
HAVE BEEN INSTALLED, REPLACING THE BADLY CORRODED
STAINLESS UNITS.  THE PHENOL LINING HAS FLAKED OFF
AND WILL NOT BE REPLACED.  WORK IS SCHEDULED TO
BEGIN ON A NEW PH MONITORING SYSTEM IN JANUARY.
GENERAL MOTORS CORPORATION
PARMA, OHIO
GM ENVIRONMENTAL
COAL (2.5X SULFUR)
128,400 SCFM (TOTAL - 4 BOILERS)
START-UP    3/74
DOUBLE ALKALI (DILUTE)
STATUS - OPERATIONAL
*BKGD: THE FGD SYSTEM CONSISTS OF 4 CM-DESIGNED
DUAL ALKALI SCRUBBERS OPERATING ON 4 BOILERS.  THE
SCRUBBERS HANDLE A TOTAL 240,000 ACFM OF FLUE GAS.
*4TH OTR 78: AN OPERABTLITY OF 23.9X WAS REPORTED •
FOR THE PERIOD.  THE CORRODED STAINLESS STEEL    y
STACKS WERE REPLACED WITH CORTEN STEELr AND THE
TOPS OF THE ABSORBERS WERE MODIFIED TO REDUCE FLUE
GAS VELOCITY ENTERING THE STACKS.
GENERAL MOTORS CORPORATION
PONTIAC, MICHIGAN
GM ENVIRONMENTAL
COAL (0.84X SULFUR)
107,300 SCFM (TOTAL - 2 BOILERS)
START-UP    4/76
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
*BKGD: THE SCRUBBER SYSTEM CONSISTS OF TWO G.M.
SODIUM UNITS FOR THE REMOVAL OF FLYASH AND SULFUR
DIOXIDE FROM THE FLUE GAS OF TWO COAL-FIRED
BOILERS.
•4TH OTR 78: PRESSURE FILTERS HAVE BEEN INSTALLED
IN THE RECIRCULATION LINES TO PREVENT FURTHER
ABRASION PROBLEMS IN PUMPS ANO PIPING DUE TO
FLYASH.  TO DATE, THIS MODIFICATION HAS BEEN
SUCCESSFUL.
7
GENERAL MOTORS CORPORATION
ST. LOUIS, MISSOURI
A.O. LITTLF
COAL (3.2X SULFUR)
64,000 SCFM (TOTAL - 2 BOILERS)
START-UP    0/72
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
*BKGD: THIS 502 CONTROL SYSTEM CONSISTS OF TWO GM
DESIGNED SODIUM SCRUBBING UNITS OPERABLE ON TWO
OF THE FOUR COAL-FIRED BOILERS.  THE SYSTEM IS
EQUIPPED WITH 60 F REHEAT ANO HAS THE CAPABILITY /
FOR FGD SYSTEM BYPASS.                          V
«4TH OTR 78: THE DUCTWORK DOWNSTREAM OF THE FGD
SYSTEM «AS RECONSTRUCTED TO PREVENT STAGNATION OF
THF EXHAUST GASES.  CORROSION OF THE STEEL LINER
REMAINS A PROBLEM.

-------
                                                                            STATUS TO JANUARY 1979
                                     SECTION  3 (CONTINUED)

                           SUMMARY OF FGO SYSTEMS ON INDUSTRIAL BOILERS
COMPANY INFORMATION
BACKGROUND AND SUMMARY OF RECENT OPERATIONS
GENERAL MOTORS CORPORATION
TONONANDA, NEW YORK
FMC ENVIRONMENTAL EQUIPMENT
COAL (1.2X SULFUR)
92,000 SCFM fTOTAL - 0 BOILERS)
START-UP    6/75
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
*8KGO: THE F6D SYSTEM CONSISTS OF FOUR 6* SODIUM
SCRUBBING UNITS FOR THE REMOVAL OF PAKTICULATES
AND SULFUR DIOXIDE FROM FOUR COAL-FIRED BOILERS.
*flTH QTR 78: THE FOUR STAINLESS STEEL STUB STACKS
HAVE CORRODED DUE TO ACID CARRY-OVER AND PLANS ARE
BEING MADE TO EITHER RELINE OR REPLACE THEM.
ALSO, CHEVRON MIST ELIMINATORS KILL BE INSTALLED
TO REDUCE THE ENTRAINED LIQUID IN THE FLUE GAS.
GEORGIA-PACIFIC PAPER co.
CROSSETT, ARKANSAS
AIRPOL INDUSTRIES
BARK,COAL/OIL (1.5X - a.OX SULFUR)
220,000 SCFM (1 BOILER)
START-UP    7/75
CAUSTIC WASTE STREAM
STATUS - OPERATIONAL
•BKGD:   THE FGO SYSTEM CONSISTS OF AN AIRPOL
CAUSTIC SCRUBBING UNIT TO REMOVE SULFUR DIOXIOF
AND PARTICULATE MATTER FROM THE FLUE GAS OF A
COAL/BARK OR OIL/BARK POWER BOILER.  THE SYSTEM IS
PRECEDED BY CYCLONES FOR PAHTICULATE REMOVAL.
oflTH QTR 78:   THE PLANT REPORTED NO OPERATING
PROBLEMS DURING THIS PERIOD.
SETTY OIL COMPANY
BAKERSFIELD, CALIFORNIA
FMC ENVIRONMENTAL EQUIPMENT
OIL (1.1X SULFUR)
72,000 SCFM (TOTAL - 6 BOILERS)
START-UP    fe/77
SODIUM CARBONATE SCRUBBING
STATUS - OBERATIONAL
*«TH QTR 7«: THE SODIUM CARBONATE SCRUBBING FGD
SYSTEM SUPPLIED BY FMC IN JUNE 1977, HAS PERFORMED
HELL DURING THE QUARTER.  THE POSITIVE DISPLACE-
MENT MOYNO PUMP EXPERIENCED ABRASION ON THE ROTOR.
ALLOYS SUCH AS CHROME-ALLOY AND NI-HARD ARE BEING
REVIEWED AS REPLACEMENT MATERIAL.
BETTY OIL COMPANY
BAKERSFIELO, CALIFORNIA
IN-HOUSE DESIGN
OIL (1.1X SULFUR)
495,000 SCFM CTOTAL-45 BOILERS)
START-UP   12/78
SODIUM CARBONATE SCRUBBING
STATUS - OPERATIONAL
*BKGO: GETTY OIL COMPANY HAS DEVELOPED AN IN-
HOUSE FGO PROCESS DESIGN AND PLANS TO UTILIZE THIS
PROCESS TO CONTROL EMISSIONS FROM 81 STEAM GENER-
ATORS, AT THE BAKERSFIELO EOR SITE.  THERE WILL BE
9 FGD SYSTEMS, EACH CONTROLLING FL»E GAS GENERATED
BY 9 STEAM GENERATORS.  EACH SYSTEM WILL INCLUDE
AN ABSORBER MODULE (PURCHASED FROM KOCH ENGINEER-
ING) CONTAINING THREE FLEXIMESH TRAYS AND ONE
FLEXIMESH MIST ELIMINATOR.  THIS ENTRY ADDRESSES
THE 5 FGD SYSTEMS WHICH HAVE STARTED.
«4TH QTR 78: THE 5 SYSTEMS WHICH HAVE BEGUN OPERA-
TING HAVE EXPERIENCED PROBLEMS WITH FANS, MIST
ELIMINATORS, AND SCALING.
6ETTY OIL COMPANY
BAKERSFIELD, CALIFORNIA
IN-HOUSE DESIGN
OIL (1.11 SULFUR)
396,000 SCFM (TOTAL-36 BOILERS)
START-UP    J/79
SODIUM CARBONATE SCRUBBING
STATUS - CONSTRUCTION
*BKGO: GETTY OIL HAS DEVELOPED AN IN-HOUSE FGD
PROCESS DESIGN AND PLANS TO UTILIZE THIS PROCESS
TO CONTROL EMISSIONS FROM 81 STEAM GENERATORS, AT
THE BAKERSFIELD EOR SITE.  THERE WILL BE 9 FGD
SYSTEMS, EACH CONTROLLING FLUE GAS GENERATED BY 9
STEAM GENERATORS.  THIS ENTRY ADDRESSES THE « FGD
SYSTEMS NOT YET STARTED.
*«TH QTR 78: OF THE « UNITS YET TO BEGIN OPERA-
TING, 2 ARE SCHEDULED TO START IN MID-JANUARY
AND 2 IN MID-FEBRUARY.
6REAT SOUTHERN PAPER CO.
CEDAR SPRINGS, GEORGIA
AIRPOL INDUSTRIES
BARK,COAL/OIL (l.OZ - 2.OX SULFUR)
420,000 SCFM (TOTAL - 2 BOILERS)
START-UP    0/75
CAUSTIC WASTE STREAM
STATUS - OPERATIONAL
*BKGn: THE FGD SYSTEM CONSISTS OF TWO AIRPOL
CAUSTIC SCRUBBERS TO CONTROL PARTICULATE AND
SULFUR DIOXIDE FROf TWO POWER BOlLErtS.  THE
PRIMARY FUEL IS BARK/COAL (BARK/OIL IS FIRED
OCCASIONALLY).
*QTH QTR 7*: FAILURE OF SEALS AND PACKINGS TN
PUMPS CONTINUED TO BE A PROBLEM.  NEW SEALS WILL
BE INSTALLED.  RUBBER-LINED PIPING IS GRADUALLY
BEING REPLACED WITH STAINLESS STEEL.  PLANS ARE
BEING MADE TO REDUCE THE SOLIDS CONTENT IN THE
LIQUOR BY INCREASING THE BLEED-OFF.
                                               10

-------
                                                                             STATUS  TO  JANUARY  1979
                                     SECTION   t  (CONTINUED)

                           SUMMARY OF FGD  SYSTEMS  ON  INDUSTRIAL  BOtLFRS
COMPANY INFORMATION
BACKGROUND AND SUMMARY OF RECENT OPERATIONS
GREAT WESTERN SUGAR
BILLINGS* MONTANA
GREAT WESTERN SUGAR
COAL (0.7X SULFUR)
60,000 SCFM (.TOTAL - 3 BOILERS)
START-UP   10/7T
AMMONIA-LADEN PROCESS WATER
STATUS - OPERATIONAL-
•BKGO: GREAT WESTERN SUGAR USES CONDENSATE PROCFSS
WATER PRIMARILY FOR PARTICULATE CONTROL.  TMF
WATER HAS A HIGH PH (8.7) BUT THE SYSTEM HAS A LOfc
SO? REMOVAL BECAUSE THE MTfcR IS INTROnuCFD
THROUGH PIPES RATHER THAN SPR*Y NOZZLES.
y
GREAT WESTERN SUGAR
FORT MORGAN, COLORADO
GREAT WESTERN SUGAR
COAL (1.2X SULFUR, AVERAGE)
65,230 SCFM CTOTAL - 2 BOILERS)
START-UP   I0/7fe
AMMONIA-LADEN PROCESS WATER
STATUS - OPERATIONAL
•BKGO: THE VENTURI SCRUBBER WAS DESIGNED FOR PAR-
TICULATE CONTROL AND STARTED IN OCT. 7ft.  THE CON-
OENSATE PKOCESS WATER USED HAS A HIGH PH (8.7)
WHICH REMOVES SOME S02.  THE PAHTICUL4TE AN11 SO?
CONTROL EFFICIENCIES ARE 961 ANO «8X RESPECTIVELY.
y
GREAT WESTERN SUGAR
GERING, NEBRASKA
GREAT WESTERN SUGAR
COAL (1.2X SULFUR, AVERAGE)
110,000 SCFM (TOTAL - 2 BOILERS)
START-UP   10/75
AMMONIA-LADEN PROCESS WATER
STATUS - OPERATIONAL
*BK&0: GREAT WESTERN SUGAH USES CONDENSATF PROCESS
WATER PRIMARILY FOR PARTICULATE CONTROL.  THE
WATER HAS A HIGH PH (8.7) BUT THE SYSTEM HAS A LOW
S02 REMOVAL.  THE VENTURI SCRUBBERS WERE INSTALLED
IN OCT. 75,  THE PLANT OPERATES ONLY DURING THE
FALL QUARTER.
 y
6REAT WESTERN SUGAR
6REELEY, COLORADO
GREAT WESTERN SUGAR
COAL (0.6X SULFUR)
25*000 SCFM (1 BOILER)
START-UP   10/75
AMMONIA-LADEN PROCESS MATER
STATUS - OPERATIONAL
•BKGO: GREAT WESTERN SUGAR USES CONDENSATE PROCESS
WATER PRIMARILY FOR PARTICULATE CONTROL.  THE
WATER HAS A HIGH PH (8.7) BUT THE SYSTEM HAS A LOft
80S REMOVAL BECAUSE THE WATER IS INTRODUCED
THROUGH PIPES RATHER THAN SPRAY NOZZLES.
GREAT WESTERN SUGAR
LONGMONT, COLORADO
GREAT WESTERN SUGAR
COAL C0.7X SULFUR)
3CFM-N/A
START-UP   10/73
AMMONIA-LADEN PROCESS WATER
STATUS - TERMINATED
SUGAR PRODUCTION AND ALL PLANT OPERATIONS
HAVE BEEN TERMINATED AT THF LONGMONT PLANT.
GREAT WESTERN SUGAR
LOVELANO, COLORADO
GREAT WESTERN SUGAR
COAL U.2X SULFUR, AVERAGE)
121,800 SCFM CTOTAL - 3 BOILERS)
START-UP   10/73
AMMONIA-LADEN PROCESS WATER
STATUS - OPERATIONAL
•BKGD: GREAT WESTERN SUGAR USES CONDENSATE PROCESS
WATER PRIMARILY FOR PARTICULATE CONTROL.  THE
WATER HAS A HIGH PH (8.7) BUT THE SYSTEM HAS A LO*   y
SO? REMOVAL.  THE SCRUBBERS W£R£ 1NSTALLFD IN OC-   J
TOBER 1973.  THE PLANT OPERATES ONLY DURING THE
FALL QUARTER.
GREAT WESTERN SUGAR
SCOTTS BLUFF, NEBRASKA
GREAT WESTERN SUGAR
COAL (1.2X SULFUR, AVERAGE)
65*230   SCFM (TOTAL - Z BOILERS)
START-UP   10/75
AMMONIA-LADEN PROCESS WATER
STATUS - OPERATIONAL
*BKGD: THE PLANT OPERATES ONLY OURINP THE FALL
QUARTER OF EACH YEAR.  THE VENTURI SCRUBBER WAS
DESIGNED FOR PARTICULATE CONTROL AND «AS STARTED
IN OCT. 75.  THE PARTICULATE AND S02 REMOVAL
EFFICIENCIES ARE 
-------
                                                                                STATUS TO JANUARY 1979
                                         SECTION  ^ (CONT IH'UEO)

                               SUMMARY  ()F FGD  SYSTEMS  Ofu INDUSTRIAL  ROILFRS
    COMPANY  INFORMATION
                                                    BACKGROUND AND SUMMARY OF RECENT OPERATIONS
    GRISSOM  AIR  FORCE  RASE
    BUNKER HILL,  INDIANA
    AIRPOL INDUSTRIES
    COAL  (0.9X -  4.6X  SULFUR)
    32,000 SCFM  (TOTAL  -  3  BOILERS)
    START-UP    9/79
    DOUBLE ALKALI  (CONCENTRATED)
    STATUS - PLANNED-CONTRACT  AWARDED
                                                    *aTH (JTW 78: THE AIM FORCE HAS AWARDED A CONTRACT
                                                    TO ATHPOL INDUSTRIES FOH A CONCENTRATED DOUBLE-
                                                    ALKALI FGO SYSTEM TO CONTROL EMISSIONS FROM ONE
                                                    NEW AND TrtO EXISTING COAL-FIRED BOILERS.  START-UP
                                                    IS SCHEDULED FOR AUGUST 30, 1979.  ATRPOL HAS
                                                    GUARANTEED THAT EMISSIONS FROM THE SYSTEM HILL NOT
                                                    EXCEED 1.2 LB/MM BTU SOS OR 0.171 LB/MM BTU FOR
                                                    PARTICIPATE.
    HARRIS  MINING  CO.
    SPRUCE  PINE, NORTH  CAROLINA
    W.W.  SLY  MANUFACTURING  CO.
    COAL  (0.8X  SULFUR)
    a,000 SCFM  (TOTAL - 2 BOILERS)
    START-UP     0/73
    WATER SCRUBBING  (NA,NH? OPTN.)
    STATUS  -  INDEFINITELY SHUT DOWN
                                                    •BKGO: THE FGO SYSTEM CONSISTS OF A W.W. SLY IM-
                                                    PINJET SCRUBBER CURRENTLY BEING USED STRICTLY AS A
                                                    PARTICIPATE CONTROL DEVICE.  THE SYSTEM HAS THE
                                                    CAPABILITY OF SCRUBBING WITH AMMONIA OR CAUSTIC
                                                    IF S02 CONTROL IS NECESSARY.  HOWEVER, AS LONG AS
                                                    CURRENT LOW-SULFUR COAL SUPPLIES LAST, THERE IS NO
                                                    NEED FOR soa CONTROLS.
    ITT  RAYONTER,  INC.
    FERNANOINA BEACH, FLORIDA
    AIRPOL  INDUSTRIES
    BARK,OIL  (2.01  - 2.51  SULFUR)
    176,000 SCFM  (TOTAL -  4 BOILERS)
    START-UP    0/75
    SODIUM  HYDROXIDE SCRUBBING
    STATUS  -  OPERATIONAL
                                                    •BKGD: AT FERNANDINA BEACH, ITT RAYONIER FIRES
                                                    BAHK AND OIL IN TWO OF TH£ FOUR PROCESS STEAM
                                                    BOILERS.  PARTICULATE AND 802 EMISSIONS ARE CON-
                                                    TROLLED IN TWO AIRPOL SCRUBBING TRAINS.
                                                    • 4TH QTR 78: MODULE A WAS DOWN FOR TEN DAYS
                                                    TO REPAIR THE CRACKED FOUNDATION OF THE FAN.
                                                    AT THIS TIME THE PRECEDING DUST COLLECTOR
                                                    WAS ALSO REPAIRED.  NEW OUST COLLECTORS ARE
                                                    SCHEDULED TO BE INSTALLED IN APRIL WHICH WILL
                                                    HEIP REDUCE EROSION PROBLEMS.
v/
KERR-MCGEE CHEMICAL CORP.
TRONA, CALIFORNIA
COMBUSTION EQUIPMENT ASSOC.
COKE/COAL/OIL (0.5* - 5.01 SULFUR)
090,000 SCFM (TOTAL - 2 BOILERS)
START-UP    6/78
SODIUM CARBONATE SCRUBBING
STATUS - OPERATIONAL
*BKGD! THE FSO SYSTEM CONSISTS OF A COMBUSTION
EQUIPMENT (CEA) SODA ASH SCRUBBING SYSTEM WHICH
REMOVES FLYASH AND SULFUR DIOXIDE FROM THE FLUE
GAS OF THE TWO COAL-FIRED BOILERS.
• 4TM QTR 78: THE 317L S3 SIEVE TRAYS ARE WORKING
WELL.  FUEL USED, WAS A MIXTURE OF O.SX SULFUR
COAL AND 3.51 SULFUR COKE.  BOTH SCRUBBERS
DEMONSTRATED 100X RELIABILITY DURING THIS PERIOD.
   HEAD PAPERBOARD CO.
   STEVENSON,  ALABAMA
   AIRPOU  INDUSTRIES
   OIL  (1.5Z -  3X SULFUR)
   100,000 SCFM (TOTAL - 2 BOILERS)
   START-UP     0/75
   SODIUM  CARBONATE SCRUBBING
   STATUS  - OPERATIONAL
                                                    •BKGD: AIRPOL INDUSTRIES HAS SUPPLIED A PARTICUL-
                                                    ATE AND S02 CONTROL SYSTEM FOR THE TWO OIL-FIRED
                                                    BOILERS AT THIS MEAD PULP MILL.
                                                    •4TH QTR 78: THE SCRUBBER DEMONSTRATED 100X RELI-
                                                    ABILITY DURING THE REPORT PERIOD.  IN NOVEMBER
                                                    ONE BOILER MAS DOWN FOR 24 HOURS AND THE OTHER
                                                    FOR 4» HOURS TO REPLACE SEALS AND PREHEATERS.
                                                    THE BOILERS OPERATED AT APPROXIMATELY 80* LOAD.
   MINN-DAK FARMER'S CO-OPERATIVE
   WAHPETON, NORTH DAKOTA
   KOCH ENGINEERING
   LIGNITE  (l.OZ SULFUR)
   164,000  SCFM  (TOTAL - 2 BOILERS)
   START-UP    6/77
   AMMONIA  SCRUBBING
   STATUS - OPERATIONAL
                                                    •BKGD: KOCH ENGINEERING HAS SUPPLIED TWO AMMONIA-
                                                    BASED 302 CONTROL SYSTFMS FOR THESE COAL-FIRED
                                                    BOILERS.  EACH YEAR THE PLANT ONLY PRODUCES SUGAR
                                                    DURING THE SEPTEMBER-FEBRUARY PfRIOO.
                                                    *4TH QTR 78: PLANS ARE BEING MADE TO ENCLOSE
                                                    MORE OF THE WASTE TREATMENT FACILITIES SINCE
                                                    EXCESSIVE HEAT LOSS IN THE DIGESTERS WAS A CON-
                                                    CERN.  THE FGD SYSTEM OPERATED PROBLEM FREE DURING
                                                    THE REPORT PERIOD.
   MOBIL OIL COMPANY
   BUTTONWILLOW, CALIFORNIA
   HEATER TECHNOLOGY
   OIL  (1.1Z SULFUR)
   80,500 SCFM  (TOTAL - 7 BOILERS)
   START-UP     2/79
   SODIUM CARBONATE SCRUBBING
   STATUS - CONSTRUCTION
                                                    •BKGD: MOBIL OIL HAS PURCHASED SEVEN EOUCTOR-TYPE
                                                    SCRUBBERS FROM HEATER TECHNOLOGY FOR THE CONTROL
                                                    OF EMISSIONS FROM 7 STEAM GENERATORS (25 MM BTU/
                                                    HR).  EACH SYSTEM CONSISTS OF A VENTURI SECTION, A
                                                    RECYCLE TANK, AND AN OUTLET DUCT WITH A-MIST
                                                    ELIMINATOR.
                                                    •4TH QTR 78: START-UP DATE HAS BEEN EXTENDED TO
                                                    FEBRUARY 1979 DUE TO DELAYS IN AWARDING SUB-
                                                    CONTRACTS FOR PIPING AND OTHER WORK.
                                                   12

-------
                                                                             STATUS  TO  JANUARY  1979
                                     SPCTION   5  (CONTINUED)

                           SUMMARY OF  FGO  SYSTEMS  ON  INDUSTRIAL  BOILERS
COMPANY INFORMATION
BACKGROUND AND SUMMARY OF RF.CF.NT OPERATIONS
MOBIL OIL COMPANY
SAN ARDOr CALIFORNIA
IN-HOUSE DESIGN
OIL (2.OX - ?.25X SUIFUR)
175,000 SCFM (TOTAL - 28 BOILERS)
START-UP    0/74
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
•RKOG: MOBIL HAS DESIGNED THE FGO SYSTEM BY IN-
HOUSE ENGINEERING BASED ON A PATENTED SODIUM HYDR-
OXIDE SCRUBBING PROCESS.  THE I.I). FANS ARE LINED
WITH EPUXY RESIN TO REDUCE CORROSION.
•aTH QTR 78: BECKMAN PH CONTROLLERS ARE WORKING
WELL AND ADDITIONAL UNITS HAVE BEEN INSTALLED.
AN AVAILABILITY OF ABOUT 951 WAS DEMONSTRATED
BY THE FGD SYSTEM DURING THE REPORT PERIOD.
NEKOOSA PAPERS, INC.
ASHOOWN, ARKANSAS
AIRPOL INDUSTRIES
COAL (IX - 1.5X StILFIIK)
211,000 SCFM ITOTAL -  1 BOILER)
START-UP    2/76
CAUSTIC SCRUBBING
STATUS - OPERATIONAL
*BKGD: THE FGO SYSTEM CONSISTS OF TWO AIRPOL
CAUSTIC SCRUBBERS CONTROLLING FLYASH AND SULFUP
DIOXIDE.
*4TH QTH 78: NEKOOSA IS CURRENTLY USING PURCHASED
CAUSTIC INSTEAD OF THEIR NORMAL ON-SITE CAUSTIC
WASTE STREAM BECAUSE OF A PUMP FAILURE.  ONE
SCRUBBER MODULE WAS SHUTDOWN TO PATCH THE SEPARA-
TOR LINING ANO REPAIR CORROSION LEAKS.  THE BOILER
REMAINED OPERABLE BECAUSE THE ENTIRE GAS FLOW WAS
HANDLED BY THE OTHER SCRUBBER.
NORTHERN OHIO SUGAR COMPANY
FINOLAY, OHIO
GREAT WESTERN SUGAR
COAL (l.?X SULFUR, AVERAGE)
65,230 SCFM (TOTAL - 2 BOILERS)
START-UP   10/74
SODIUM CARBONATE SCRUBBING
STATUS - TERMINATED
»BKGD: THE VENTURI TOWER WAS MAINLY DESIGNED FOR
PARTICULATE CONTROL, AND WAS STARTED UP IN OCTOBER
'74.  PARTICULATE AND S02 REMOVAL EFFICIENCIES
WERE 90x AND 7&x RESPECTIVELY.  THE 302 CONTROL
WAS EFFECTED BY THE PROCESS CONDENSATE USED FOR
SCRUBBING  (PH=8.7).
*4TH QTR 78: THIS PLANT HAS TERMINATED ALL SUGAR
PRODUCTION OPERATIONS.  THE SCRUBBER OPERATED FROM
OCTOBER 1974 THROUGH THE *77-'78 SEASON BEFORE THE
SHUTDOWN OCCURRED.
NORTHERN OHIO SUGAR COMPANY
FREEMONT, OHIO
GREAT WESTERN SUGAR
COAL (IX SULFUR)
40,000 SCFM (TOTAL - 2 BOILERS)
START-UP   10/75
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
PHILLIP MORRIS, INC.
CHESTERFIELD, VIRGINIA
FLAKT, INC.
COAL
39,000 SCFM  (TOTAL - J BOILER)
START-UP    6/79
SODIUM CARBONATE SCRUBBING
STATUS - CONSTRUCTION
•BKGD: PARTICULATE AND soz EMISSIONS ARE BEING
CONTROLLED BY A SCRUBBER/ABSORBER MODULE OF PRO-
PRIETARY DESIGN.  THE FLUE GAS IS GENERATED BY TWO
UNION BOILERS, EACH RATED a 70,000 LB/HR STEAM.
*4TH QTR 78: CONSTRUCTION IS HEARING COMPLETION ON
A NON-REGENERABLE SODIUM CARBONATE FGO SYSTEM
(SUPPLIED BY FLAKT, INC.) WHICH WILL CONTROL
EMISSIONS FROM A NEW PULVERIZED COAL-FIRED BOILER
GENERATING FLUE GAS EQUIVALENT TO 30 MW.  THE
FLAKT SYSTEM WILL REMOVE A MINIMUM OF 90X OF THE
S02 FROM 2/3 OF THE FLUE GASl THE REMAINDER OF THE
GAS WILL BE USED FOR REHEAT.
RICKENBACKER AIR FORct BASE
COLUMBUS, OHIO
RESEARCH-COTTRELL/BAHCO
COAL (3.6X SULFUR)
55,000 SCFM (TOTAL - 7 BOILERS)
START-UP    3/76
LIMESTONE SCRUBBING
STATUS - OPERATIONAL
•BKGD: THIS RESEARCH-COTTRELL/BACHO LIME FGD UNIT
WAS FIRST PLACED IN SERVICE MARCH 11, 1976.
THE SYSTEM WAS SWITCHED OVER TO LIMESTONE IN APRIL
1977, AND HAS REMAINED IN THAT OPERATING MODE TO
DATE.
*4TH OTR 78: A TOTAL OF 36 HOURS DOWNTIME WERE
REPORTED FOR THIS PERIOD, YIELDING AN AVAILABILITY
OF 9S.4X.  THE NUCLEAR DENSITY CONTROL VALVE ON
THE THICKENER UNDERFLOW WAS REPAIRED ANO CAUSED NO
DOWNTIME.
SHELL OIL COMPANY
BAKERSFIELD, CALIFORNIA
VENDOR NOT YFT SELECTED
OIL U.1X SULFUR)
99,000 SCFM (TOTAL - 6 BOILERS)
START-UP    O/ 0
PROCESS NOT YET SELECTED
STATUS - PLANNED-CONSIDERING 802 CONTROL
•BKGO: SHELL OIL IS CONSIDERING IMPLEMENTING FGD
TECHNOLOGY TO CONTROL EMISSIONS FROM e SMALL OIL-
FIRED (1.1X SULFUR) STEAM GENERATORS.  NO PROCESS
OR START-UP DATE HAVE AS YET BEEN SPECIFIED.  AN
302 REMOVAL EFFICIENCY OF 94X WILL BE REQUIRED.
                                                13

-------
                                     SECTION  J (CONTINUED)

                           SUMMARY OF FGO SYSTEMS ON INDUSTRIAL BOILFRS
                                                                            STATUS TO JANUARY  1979
COMPANY INFORMATION
                                                    BACKGROUND AND SUMMARY OF RECENT OPERATIONS
SHELL OIL COMPANY
TAFT, CALIFORNIA
VENDOR NOT YET SELECTED
OIL (1.1* SULFUR)
55,000 SCFM (TOTAL - 2 BOILERS)
START-UP    O/ 0
PROCESS NOT YET SELECTED
STATUS - PLANNED-CONSIDERING SOS CONTROL
*BK6D: SHELL OIL IS CONSIDERING IMPLEMENTING FGD
TECHNOLOGY TO CONTROL EMISSIONS FROM 2 SMALL OIL-
FIRED (1.1X SULFUR) STEAM GENERATORS.  NO PROCESS
OR START-UP DATE HAVE AS YET BEEN SPECIFIED.  AN
SOS REMOVAL EFFICIENCY OF 94* WILL BE REQUIRED.
SHELLER GLOBE CORP.
NORFOLK, VIRGINIA
H.N. SLY MANUFACTURING CO.
COAL (< I. OX SULFUR)
8,000 SCFM (TOTAL - 1 BOILER)
START-UP    0/75
SODIUM HYDROXIDE SCRUBBING
STATUS - INDEFINITELY SHUT DOWN
*BKGO: AFTER SYSTEM RESTART IN OCTOBER 1977,
THERF HAVE BEEN NO PROBLEMS RESULTING FROM EITHER
BOILER OR SCRUBBER OPERATIONS.  THE PLANT UNDER-
WENT A VIRGINIA EPA INSPECTION AND WAS FOUNn TO HE
IN COMPLIANCE WITH THE PARTICULAR EMISSION
REGULATIONS.
•QTH QTR 78: NO SCRUBBER RELATED PROBLEMS HAVE
OCCURRED DURING THIS REPORT PERIOD.  AT PRESENT
THE USE OF NAOH HAS BEEN DISCONTINUED, SO THIS
SYSTEM HAS BEEN MOVED TO OUR "INDEFINITELY
SHUTDOWN" STATUS.
ST. JOE ZINC CO.
MONACA, PENNSYLVANIA
BUREAU OF MINES
COAL (2.51 - 4.5Z SULFUR)
142,000 SCFM (TOTAL - I BOILER)
START-UP    3/79
CITRATE PROCESS
STATUS - CONSTRUCTION
*BKGD: CONSTRUCTION CONTINUES ON THE CITRATE
PROCESS SCRUBBING SYSTEM WHICH WILL CONTROL SOS
EMISSIONS FROM A 60-MM (NOMINAL PEAK CAPACITY)
COAL-FIRED POWER GENERATING UNIT.  STARTUP IS
SCHEDULED FOR MARCH 1979.  THIS SYSTEM WILL ALSO
BE REPORTED IN THE EPA/PEDCO UTILITY FGD SURVEY,
SINCE THE SYSTEM WILL BE OPERATED WITH A UTILITY-
TYPE LOAD PROFILE, DURING THE ONE-YEAR DEMONSTRA-
TION PERIOD.
ST. REGIS PAPER CO.
CANTONMENT, FLORIDA
AIRPOL INDUSTRIES
BARK,OIL/GAS (< l.OZ SULFUR)
115,000 SCFM (1 BOILER)
START-UP    0/73
CAUSTIC SCRUBBING
STATUS - OPERATIONAL
•BKGD: AIRPOL HAS SUPPLIED THE CAUSTIC SCRUBBING
SYSTEM TO REMOVE PARTICULATE AND SULFUR DIOXIDE
FROM THE FLUE GAS OF A BARK BOILER, WHICH CAN
ALSO FIRE NATURAL GAS AND OIL.
*4TH OTR 7B: PLANT HAS CHANGED THE FEEDWATER
SOURCE FROM SCREEN ROOM BLACK WATER TO EVAPORATOR
CONDENSATE WATER, TO ALLEVIATE PLUGGING PROBLEMS
IN THE MIST ELIMINATOR AND PIPING.
SUN PRODUCTION COMPANY
FELLOWS, CALIFORNIA
C-E NATCO
OIL (1.4Z SULFUR)
6,000 SCFM (IS,000 ACFM 3 570 F)
START-UP    4/79
SODIUM HYDROXIDE SCRUBBING
STATUS - CONSTRUCTION
*BKGD: SUN OIL HAS FOUR ss MM BTU/HR AND TWO so MM
BTU/HR STEAM GENERATORS AT THIS OIL SITE.  T.HE
CRUDE OIL HAS 1.4 PERCENT SULFUR.
*4TH (JTR 7«: C-E NATCO IS CONSTRUCTING THE SYSTEM.
STARTUP DATE IS APRIL 1979.
SUN PRODUCTION COMPANY
OILDALE, CALIFORNIA
C-E NATCO
OIL (1.21 SULFUR)
6,000 SCFM (IS,000 ACFM S 570 F)
START-UP    4/79
SODIUM HYDROXIDE SCRUBBING
STATUS - CONSTRUCTION
*BKGD: SUN OIL HAS TWO 25 MM BTU/HR STEAM GENERA-
TORS AT THIS OIL SITE.  THE CRUDE OIL HAS 1.2
PERCENT SULFUR.
•4TH OTR 78: THE SYSTEM, SUPPLIED BY C-E NATCO,  IS
UNDER CONSTRUCTION.  STARTUP IS EXPECTED TO OCCUR
BY APRIL 1979.
TENNECO OIL CO.
GREEN RIVER, WYOMING
VENDOR NOT YET SELECTED
COAL U.5X SULFUR, MAXIMUM)
140,000 SCFM (TOTAL - ? BOILERS)
START-UP    1/H2
SODIUM CARBONATE SCRUBBING
STATUS - PLANNED-REQUEST ING/EVALUATING BIDS
•BKGD: TENNECO OIL HAS RETAINED BROWN AND HOOT
FOR THE DESIGN OF A SODA ASH PLANT AND THE
CONCOMMITTANT POLLUTION CONTROL EQUIPMENT.
THF PLANT WILL BE LOCATED IN GREEN KIVER, WYOMING
AND WILL HAVE TWO BOTLFRS BURNING WYOMING COAL.
*4TH OTH 78: TENNECO AND B*H ARE EVALUATING BIDS
FOR THE SODIUM CARBONATE SCRUBBING SYSTEMS WHICH
WILL CONTROL SOS EMISSIONS FROM THF BOILERS.

-------
                                                                             STATUS  TO JANUARY  1979
                                     SECTION   3  (CONTINUED)

                           SUMMARY OF F6D SYSTEMS  ON  INDUSTRIAL  BOILERS
COMPANY INFORMATION
BACKGROUND AND SUMMARY OF RECENT OPERATIONS
TEXACO INCORPORATED
SAN ARDO, CALIFORNIA
CEILCOTE
OIL (1.71 SULFUR)
300,000 SCFM .(TOTAL - 32 BOILERS)
START-UP   11/73
SODIUM HYDROXIDE SCRUBBING
STATUS " OPERATIONAL
«BKGf>: FGO SYSTEM CONSISTS OF A HORIZONTAL. PACK-
ED-BEO SCKUBBER FOR FACH OF THE OIL-FIRED BOILERS.
*4TH QTR 7A: CORROSION IN THE QUENCHER AND ABRA-
SION/PLUGGING IN THE ABSORBER CONTINUE TO BE PROB-
LEM AREAS.  DURING THIS QUARTER EACH SCRUBBER MAS
SHUTDOWN FOR MAINTENANCE AN AVERAGE OF 100 HOURS.
TEXACO is PLANNING TO PHASE OUT THIS GROUP OF
SCRUBBERS BY LATE 1979.
TEXACO INCORPORATED
SAN ARDO, CALIFORNIA
OUCON COMPANY
OIL U.7X SULFUR)
117,000 SCFM (TOTAL - 9 BOILERS)
START-UP    3/79
SODIUM CARBONATE SCRUBBING
STATUS - CONSTRUCTION
       TEXACO IS PLANNING TO PHASE OUT THE
EXISTING FGO SYSTEMS AT THEIR SAN ARDO, CALIFORNIA
SITE.  AS THE FIRST STEP OF THE PROGRAM, 9 OF THE
PRESENT 31 SCRUBBERS ON 50 MM BTU/HR STEAM GENER-
ATORS ARE BEING REPLACED BY A NEW SYSTEM, SUPPLIED
BY OUCON COMPANY.  THE NEW FGD SYSTEM WILL CON-
SIST OF THREE TRAINS OF A VENTURI SCRUBBER/SPRAY
ABSORBER COMBINATION.
*
-------
                                                                            STATUS  TO JANUARY 1979
                     SlIMMAKY BY VFNIH1R OF FRl> SYSTEMS ON  INDUSTRIAL  BOIIEPS
VFNOOR
INSTALLATION NAME / LOCATION
                                                                       CONTROL  SYSTEM PROCFSS
A.O. LITTLE
AIRPOL INDUSTRIES
BUREAU OF MINFS
C-E N*TCO
CARBORUNDUM ENVIR. SYS. LTD.

CEILCOTF

COMBUSTION EQUIPMENT ASSOC.

DRAVO CORP./NAT'L LIME ASS'N

DUCON COMPANY

ENTOLETER, INC.

FLAKT, INC.

FMC ENVIRONMENTAL EQUIPMENT
GENFWAL MOTORS CORPORATION
ST. LOUIS, MISSOURI

GEORGIA-PACIFIC PAPER CO.
CROSSFTT, ARKANSAS

GREAT SOUTHERN PAPER CO.
CEDAR SPRINGS, GEORGIA

GRISSOM AIR FORCE BASE
8UNKER HILL, INDIANA

ITT RAYONTER, INC.
FERNANOINA BEACH, FLORIDA

MEAD PAPFRBOARO CO.
STEVENSON, ALABAMA

NEKOOSA PAPERS, INC.
ASHOOWN, ARKANSAS

ST. HFGIS PAPFh CO.
CANTONMENT, FLORIDA

U.S. GYPSUM CORP.
OAKMONT, PENNSYLVANIA

ST. JOE ZINC CO.
MONACA, PENNSYLVANIA

BELRIDGE OIL CO.
MCKITTHICK, CALIFORNIA

SUN PRODUCTION COMPANY
FFLLOWS, CALIFORNIA

SUN PRODUCTION COMPANY
OILDALE, CALIFORNIA

CARBORUNDUM ABRASIVES
BUFFALO. NEW YORK

TEXACO INCORPORATED
SAN ARDO, CALIFORNIA

KERR-MCGtF CHFMICAL CORP.
TRONA, CALIFORNIA

BUNGE, INC.
CAIRO, ILLINOIS

TEXACO INCORPORATED
SAN ARDO, CALIFORNIA

GENERAL MOTORS CORPORATION
DAYTON, OHIO

PHILLIP MORRIS, INC.
CHESTERFIELD, VIRGINIA

AIYFSKA PIPELINE SERVTCF co.
VALDF7, ALASKA

ARCO/POl YMF.RS, INC.
MONACA, PENNSYLVANIA

CANTON TfXTTLFS
CANTON, GEORGIA
                                                                       SODIUM  HYDROXIDE  SCRUBBING
                                                                       CAUSTIC  WASTE  STREAM
                                                                       CAUSTIC  WASTE  STRFAM
                                                                       DOUBLE  ALKALI  (CONCENTRATED)
                                                                       SODIUM HYDROXIDE SCRUBBING
                                                                       SODIUM CARBONATE SCRUBBING
                                                                       CAUSTIC  SCRUBBING
                                                                       CAUSTIC SCRUBBING
                                                                       DOUBLE  ALKALI (DILUTE)
CITRATE PROCESS
SODIUM HYDROXIDE SCRUBBING
                                                                       SODIUM  HYDROXIDE SCRUBBING
                                                                       SODIUM  HYDROXIDE SCRUBBING
LIME SCRUBBING
SODIUM HYDROXIDE SCRUBBING
SODIUM CARBONATE SCRUBBING
LIME SCRUBBING
SODIUM CARBONATE SCRUBBING
SODIUM HYDROXIDE SCRUBBING
SODIUM CARBONATE SCRUBBING
SODIUM HYDROXIDE SCRUBBING
                                                                       DOUBLE ALKALI (CONCFNTRATEO)
                                                                       CAUSTIC WASTE STREAM

-------
                                                                           STATUS TO JANUARY 1979
                                    SECTION  q  (CONTINUED)

                     SUMMARY BY VENDOR OF FGD SYSTEMS ON  INDUSTRIAL BOILERS
VENDOR


FMC ENVIRONMENTAL EQUIPMENT
GM ENVIRONMENTAL
GREAT WESTERN SUGAR
HEATER TECHNOLOGY
                                     INSTALLATION NAME  / LOCATION
CATERPILLAR TRACTOk CO.
FAST PEOKIA, ILLINOIS

CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS

CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS

CATERPILLAR TRACTOR CO.
MOSSVILLE, ILLINOIS

CHANSLOR WESTERN OIL * DEV. CO
BAKERSFIELD, CALIFORNIA

FIRESTONE TIRE AND RUBBER CO.
POTTSTOWN, PENNSYLVANIA

FMC (SODA ASH PLANT)
GREEN RIVER, WYOMING

GENERAL MOTORS CORPORATION
TONOWANDA, NEW YORK

GETTY OIL COMPANY
BAKERSFIELD, CALIFORNIA

TRANSCO TEXTILES, INC.
AUGUSTA, GEORGIA

GENERAL MOTORS CORPORATION
PARMA, OHIO

GENERAL MOTORS CORPORATION
PONTIAC, MICHIGAN

GREAT WESTERN SUGAR
HILLINGS, MONTANA

GREAT WESTERN SUGAR
FORT MORGAN, COLORADO

GREAT WESTERN SUGAR
GERING, NEBRASKA

GREAT WESTERN SUGAR
GREELEY, COLORADO

GREAT WESTERN SUGAR
LONGMONT, COLORADO

GREAT WESTERN SUGAR
LOVELANO, COLORADO

GREAT WESTERN SUGAR
SCOTTS BLUFF, NEBRASKA

NORTHERN OHIO SUGAR COMPANY
FINDLAY, OHIO

NORTHERN OHIO SUGAR COMPANY
FREEMONT, OHIO

BELRIOGE OIL CO.
MCKITTRICK,  CALIFORNIA

MOBIL OIL COMPANY
BIITTONMILLOW, CALIFORNIA
                                  CONTROL SYSTEM PROCESS
DOUBLE ALKALI (CONCENTRATED)
                                                                      DOUBLE  ALKALI  (CONCENTRATED)
                                                                      DOUBLE  ALKALI  (CONCENTRATED)
                                                                      DOUBLE  ALKALI  (CONCENTRATED)
                                                                       DOUBLE  ALKALI  (CONCENTRATED)
                                                                      DOUBLE  ALKALI  (CONCENTRATED)
                                                                       SODIUM  CARBONATE SCRUBBING
                                                                       SODIUM  HYDROXIDE  SCRUBBING
                                                                       SODIUM  CARBONATE  SCRUBBING
                                                                       SODIUM  CARBONATE  SCRUBBING
DOUBLE ALKALI (DILUTE)
                                                                       SODIUM  HYDROXIDE SCRUBBING
AMMONIA-LADEN PROCESS WATER
                                                                       AMMONIA-LADEN  PffOCESS WATER
                                                                       AMMONIA-LADEN  PROCESS WATER
                                                                       AMMONIA-LADEN PROCESS WATER
                                                                       AMMONIA-LADEN PROCESS WATER
                                                                      AMMONIA-LADEN PROCESS WATER
                                                                      AMMONIA-LADEN PROCESS WATER
                                                                      SODIUM CARBONATE SCRUBBING
                                                                      SODIUM HYDROXIDE SCRUBBING
SODIUM HYDROXIDE SCRUBBING
                                                                      SODIUM CARBONATE SCRUBBING

-------
                                                                           STATUS TO JANUARY  1<»7P
                                    SECTION  a (CONTINUED)

                     SUMMARY BY VENDOR OF FGI) SYSTEMS ON INDUSTRIAL BOILERS
VENDOR
                                    INSTALLATION NAME / LOCATION
                                                                      CONTROL SYSTFM PROCESS
IN-HOUSE DESIGN
KOCH ENGINEERING
PITTSBURG ENV. * ENGY. SYSTEMS
RESEARCH-COTTRELL/8AHCO
SHEMCO INC.
THERMOTICS INC.
VENDOR NOT YET SELECTED
M.H. SLY MANUFACTURING CO.
ZURN  INDUSTRIES
SETTY OIL COMPANY
flAKERSFIELO, CALIFORNIA

GETTY OIL COMPANY
8AKFRSFIELO, CALIFORNIA

MOBIL OIL COMPANY
SAN ARDO, CALIFORNIA

ARMCO STEEL
MIDDLETOtvN, OHIO

CHEVRON U.S.A. INC.
BAKERSFTELD, CALIFORNIA

CHEVRON U.S.A. INC.
8AKERSFIELD, CALIFORNIA

MINN-DAK FARMER'S CO-OPERATIVE
WAHP6TON, NORTH DAKOTA

WESTERN CORRECTIONAL INST.
PITTSBURG, PENNSYLVANIA

RICKENBACKER AIR FORCE BASE
COLUMBUS, OHIO

TEXASGULF
GRANGER* WYOMING

BELRIDGE OIL CO.
MCKITTHICK, CALIFORNIA

C.A.t*.(CARBTDF-AMOCO-KONSANTO)
HOUSTON, TEXAS

DUPONT, INC.
GEORGIA

DUPONT, INC.
TEXAS

SHELL OIL COMPANY
BAKERSFIELO, CALIFORNIA

SHELL Oil COMPANY
TAFT, CALIFORNIA

TENNECO OIL CO.
GREEN RIVEK, WYOMING

AMERICAN THREAD CO.
MARION, NORTH CAROLINA

HARRIS MINING co.
SPRUCE PINE, NORTH CAROLINA

SHFLLER GLOBE CORP.
NORFOLK, VIRGINIA

CATFKPILLAR TRACTOR CO.
JOLICT,  ILLINOIS

CATERPILLAR TRACTOR CO.
MORTON, ILLINOIS
                                                                      SODIUM CARBONATE SCRUBBING
                                                                      SODIUM CARBONATE SCRUBBING
                                                                      SODIUM HYDROXIDE SCRUBBING
                                                                      LTME SCRUBBING
                                                                      SODIUM CARBONATE SCRUBBING
                                                                      SODIUM CARBONATE SCRUBBING
                                                                      AMMONIA SCRUBBING
                                                                      SULF-X SCORE
LIMESTONE SCRUBBING
SODIUM CARBONATE SCRUBBING
                                                                      SODIUM HYDROXIDE  SCRUBBING
                                                                      PROCESS NOT YET  SELECTED
                                                                      DOUBLE ALKALI
                                                                      LIMESTONE SCRUBBING
                                                                      PROCESS NOT YET SELECTED
                                                                      PROCESS NOT YET SELECTED
                                                                      SODIUM CARBONATE SCRUBBING
                                                                      CAUSTIC WASTE STREAM
                                                                      KAIEK SCRUBBING  (NA.NH3  OPTN.)
                                                                      SODIUM HYDROXIDE  SCRUBBING
                                                                      DOUBLE ALKALI  (DILUTE)
                                                                      DOUBLE ALKALI  (DILUTE)

-------
                                                                             STATUS  TO  JANUARY  197')
                                            SECTION   5

                          OPERATIONAL f&O  SYSTEMS ON INDUSTRIAL  HOfLERS
COMPANY/LOCATION/FUEL
                                    NEW/
                                  RETROFIT
              UNIT SI7E
               (SCFM)
                                PROCESS/VFNDOR
                                        START-UP
                                          NO/YH
ALYESKA PIPELINE SERVICE CO.
VALDEZ, ALASXA
Oil (0.03X - 0.1% SULFUR)
                                 NEW
                50,000    SODIUM HYDROXIDE SCRUBBING       fe/77
                          FMC ENVIRONMENTAL EQUIPMENT
AMERICAN THREAD CO.
MARION, NORTH CAROLINA
COAL (1 " 1.5* SULFUR)
                                 RETROFIT
                IB,500
          CAUSTIC WASTE STREAM
          W.A. SLY MANUFACTURING co.
                                                           0/73
ARMCO STEEL
MIDDLETOHN, OHIO
COAL (0.81 SULFUR)
                                 RETROFIT
                64,000
          LIME SCRUBBING
          KOCH ENGINEERING
                                 0/75
BELRIOGE OIL CO.
MCKITTRICK, CALIFORNIA
OIL (l.lt SULFUR)
                                 NEW
                13,000
          SODIUM HYDROXIDE SCRUBBING
          HEATER TECHNOLOGY
                                                                                             6/78
BELRIOGE OIL CO.
MCKITTRICK, CALIFORNIA
CRUDE OIL  fl.lX SULFUR)
                                 NEW
                                                  I?,000
                          SODIUM HYDROXIDE SCRUBBING
                          THERMOTICS  INC.
                                                                                             7/78
CANTON TEXTILES
CANTON, GEORGIA
COAL (0.81 SULFUR)
INTERRUPTIBLE NATURAL GAS
RETROFIT
25,000    CAUSTIC WASTE STREAM             fe/74
          FMC ENVIRONMENTAL EOUIPMENT
CATERPILLAR TRACTOR CO. .
EAST PEORIA, ILLINOIS
COAL (3.2X SULFUR)
  NEW, 2 RETRO  210,000   DOUBLE ALKALI  (CONCENTRATED)     a/78  r
                          FMC ENVIRONMENTAL EQUIPMENT
CATERPILLAR TRACTOR CO.
MOS3VILLE, ILLINOIS
COAL (3.as SULFUR)
2 NEW 2 RETRO   140,000   DOUBLE ALKALI  (CONCENTRATED)    10/75  '
                          FMC ENVIRONMENTAL EQUIPMENT
CATERPILLAR TRACTOR CO.
JOLIET, ILLINOIS
COAL (3.2X SULFUR)
RETROFIT
67,000
DOUBLE ALKALI (DILUTE)
ZURN INDUSTRIES
                                                                                             9/74
CATERPILLAR TRACTOR CO.
MORTON, ILLINOIS
COAL (3.2X SULFUR)
RETROFIT
39,000
DOUBLE ALKALI (DILUTE)
ZURN INDUSTRIES
                                                                                             1/78
CHEVRON U.S.A. INC.
BAKERSFIELD, CALIFORNIA
OIL (1.1X SULFUR)
RETROFIT
248,000   SODIUM CARBONATE SCRUBBING
          KOCH ENGINEERING
                                                                                             7/78
FIRESTONE TIRE AND RUBBER CO.
POTTSTOHN, PENNSYLVANIA
COAL (2.5 - 3.OX SULFUR)
RETROFIT
                8070
          DOUBLE ALKALI (CONCENTRATED)
          FMC ENVIRONMENTAL EQUIPMENT
                                 1/75  ,.
    (SODA ASH PLANT)
6REEN RIVER, WYOMING
COAL (IX SULFUR)
NE*
446,000   SODIUM CARBONATE SCRUBBING
          FMC ENVIRONMENTAL
                                                           S/76

-------
                                                                             STATUS  TO  JANUARY 1979
                                     SECTION  5  (rOMTTNUFlO

                          OPERATIONAL FED  SYS1FMS ON  IMQUSTKfAI. ROILFWS
COMPANY/LOCATION/FtlfcL
                                    NfcW/
                                  RETROFIT
              UNIT M7F.
               (SCFM)
                PROCFSS/VFNOOR
                                        START-UP
                                          MO/YR
GENERAL MOTORS CORPORATION
ST. LOUIS, MISSOURI
COAL (3.2X SULFUR)
RETROFIT        60,000    SODIUM HYOROXIOF SCRUBBING
                          A.O. LITTLF
                                                                                             0/72
GENERAL MOTORS CORPORATION
DAYTON, OHIO
COALC0.7X - 2.OX SIR FUR)
RETROFIT        Jh.OOO    SODIUM HYDROXIDE SCRUBBING
                          ENTOLETFR, INC.
                                                                                             9/7a
GENERAL MOTORS CORPORATION
TONOWANOA, NFW YORK
COAL U.2X SULFUR)
                                 RETROFIT
                9?,000    SODIUM HYDROXIDE SCRUBBING
                          FMC ENVIRONMENTAL EQUIPMENT
                                                                                             6/75
GENERAL MOTORS CORPORATION
PARMA, OHIO
COAL (2.5X SULFUR)
                                 RETROFIT
                128,400   DOUBLE ALKALI (DILUTE)
                          GM ENVIRONMENTAL
GENERAL MOTORS CORPORATION
PONTIAC, MICHIGAN
COAL (0.84X SULFUR)
ALSO HOOD, PAPER, AND CARDBOARD.
NEh
107,300   SODIUM HYDROXIDE SCRUBBING
          GM ENVIRONMENTAL
                                                                                             0/76
GEORGIA-PACIFIC PAPER CO.         NEW
CROSSETT, ARKANSAS
BARK,COAL/OIL C1.5X - a.OX SULFUR)
                230,000   CAUSTIC WASTE STREAM
                          AIRPOL INDUSTRIES
                                           7/75
6ETTY OIL COMPANY
BAKERSFIELD, CALIFORNIA
OIL  (J.1X SULFUR)
                                  RETROFIT
                7?,000    SODIUM CARBONATE SCRUBBING
                          FMC ENVIRONMENTAL EQUIPMENT
                                           6/77
GETTY OIL COMPANY
BAKERSFIELD, CALIFORNIA
OIL  (1.1X SULFUR)
                                  RETROFIT
                495,000   SODIUM CARBONATE SCRUBBING
                          IN-HOUSE DESIGN
                                          12/78
GREAT SOUTHERN PAPFR  CO.          RETROFIT
CEDAR SPRINGS, GEORGIA
BARK,COAL/OIL  (t.OX - 2.OX  SULFUR)
                «20,000   CAUSTIC WASTE STRFAK
                          AIRPOL INDUSTRIES
                                           0/75
GREAT WESTERN  SUGAR
BILLINGS, MONIANA
COAL  (0.7X  SULFUR)
RETROFIT
                60,000    AMMONIA-LADEN PROCESS WATER
                          GREAT WESTERN SUGAR
                                          10/77
GREAT WESTERN  SUGAR
FORT MORGAN, COLORADO
COAL  (1.2X  SULFUR,  AVERAGE)
RETROFIT        65,230    AMMONIA-LADEN PROCESS WATF.R
                          GRfcAT WESTERN SUGAR
                                          10/76
GREAT  WESTERN SUGAR
GERING,  NEBRASKA
COAL  (1.2X  SULFUR,  AVERAGE)
RETROFIT        110,000   AMMONIA-LADEN PROCESS WATER
                          GREAT WESTERN SUGAR
                                          10/75
 GREAT  WESTFRN SUGAR
 GREELEY,  COLORADO
 COAL  (0.6X SULFUR)
 RETROFIT
                25,000    AMMONIA-LADEN PROCESS WATER
                          GREAT WESTERN SUGAR
                                          10/75
                                                20

-------
                                                                             STATUS  Til  .[ANIIAWY  1079
                                     SECTION   5  (CONTINUFO)

                          OPFHATTONAl  FGD  SYSTEMS  ON  INDUSTRIAL  80TLERS
COMPANY/LOCATION/FUEL
                                     NEW/
                                   RETROFIT
                                                UNIT  SIZE
                                                 (SCFM)
                                                                  PROCESS/VENDOR
                                        START-UP
                                          MO/YR
GREAT WESTERN SUGAR
LOVELAND, COLORADO
CO»L (1.2Z SULFUR, AVERAGE)
                                  RETROFIT
                                                  121,800    AMMONTA-LADEN PROCESS HATER
                                                            GREAT  WESTERN SUGAR
                                          10/73
GREAT WESTERN SUGAR
8COTTS BLUFF, NEBRASKA
COAL (1.2Z SULFUR, AVERAGE)
                                 RETROFIT
65,230    AMMONIA-LADEN PROCESS MATER
          GREAT WESTERN SUGAR
                                                                                            10/75
ITT RAYONIER, INC.
FERNANDINA BEACH, FLORIDA
BARK,OIL (3.OS - 2.5X SULFUR)
                                 RETROFIT
176,000   SODIUM HYDROXIDE SCRUBBING
          AIRPOL INDUSTRIES
                                                                                             0/75
KERR-MCGEE CHEMICAL CORP.        NFW
TRONA, CALIFORNIA
COKE/COAL/OIL CO.51 - 5.OX SULFUR)
                                                  090,000    SODIUM CARBONATE  SCRUBBING
                                                            COMBUSTION EQUIPMENT  ASSOC.
                                           6/78
HEAD PAPERBOARD CO.
STEVENSON, ALABAMA
OIL (1.5X - 3X SULFUR)
                                 NEW
                                                  100,000    SODIUM CARBONATE  SCRUBBING
                                                            AIRPOL INDUSTRIES
                                                                                             0/75
MINN-DAK FARMER'S CO-OPERATIVE   RETROFIT
MAHPETON, NORTH DAKOTA
LIGNITE (l.OX SULFUR)
                                                  164,000    AMMONIA  SCRUBBING
                                                            KOCH ENGINEERING
                                                                                             6/77
MOBIL OIL COMPANY
SAN AROO, CALIFORNIA
OIL (2.OX - 2.25X SULFUR)
                                 RETROFIT
175,000   SODIUM HYDROXIDE SCRUBBING
          IN-HOUSE DESIGN
                                                                                             0/74
NEKOOSA PAPERS, INC.
ASHDOWN, ARKANSAS
COAL (IX - 1.51 SULFUR)
                                 NFW
                                                  211,000    CAUSTIC  SCRUBBING
                                                            AIRPOL INDUSTRIES
                                                                                             2/76
NORTHERN OHIO SUGAR COMPANY
FREEMONT, OHIO
COAL (IX SULFUR)
                                 RETROFIT
40,000    SODIUM HYDROXIDF SCRUBBING
          GREAT WESTERN SUGAR
                                                                                            10/75
RICKENBACKER AIR FORCE BASE
COLUMBUS, OHIO
COAL (3.6X SULFUR)
                                 RETROFIT
55,000    LIMESTONE SCRUBBING
          RESF. ARCH-COT TRELL/BAHCO
                                                                                             3/76
ST. REGIS PAPER CO.
CANTONMENT, FLORIDA
BARK,OIL/GAS (< I.OX SULFUR)
                                 RETROFIT
115,000   CAUSTIC SCRUBBING
          AIHPOL INDUSTRIES
                                                                                             0/73
TEXACO INCORPORATED
SAN ARDO, CALIFORNIA
OIL (1.7X SULFUR)
                                 RETROFIT
3HO,000   SODIUM HYDROXIDE SCRUBBING
          CEILCOTE
                                                                                            11/73
TEXASGULF
GRANGER, WYOMING
COAL (0.75X SULFUR)
                                 NEW
140,000   SODIUM CARBONATE SCRUBBING
          SWEMCO INC.
                                                                                             "»/76
                                               21

-------
                                                                            ST*TUS TO JANUARY  1979
                                           SECTION  6

                       UNDFH CONSTRUCTION FGD SYSTEMS ON INDUSTRIAL ROILFRS
COMPANY/LOCATION/FUEL
                                    NEW/
                                  RETROFIT
              UNIT SIZE
               (SCFM)
                PROCESS/VENDOR
                                        START-UP
                                          MO/Yh
ARCO/POLYMERS, INC.
MONACA, PENNSYLVANIA
COAL (.3.01 SULFUR)
RETROFIT        ?36,000   DOUBLE ALKALI (CONCENTRATED)     6/SO
                          FMC ENVIRONMENTAL EQUIPMENT
8ELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA
CRUDE OIL  Cl.ll SULFUR)
                                 RETROFIT
                13,000    SODIUM HYDROXIDE SCRUBBING
                          C-F NATCO
                                                                                             1/79
CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS
COAL (3.2* SULFUR)
                                 NEW
                131,000   DOUBLE ALKALI (CONCENTRATED)
                          FMC ENVIRONMENTAL EQUIPMENT
                                                                                             1/79
CHANSLOR WESTERN OIL K OEV. CO
BAKERSFIELD, CALIFORNIA
OIL C1.5X SULFUR)
NEh
70,000    DOUBLE ALKALI (CONCENTRATED)
        • FMC ENVIRONMENTAL EQUIPMENT
                                                                                             3/79
GETTY OIL COMPANY
BAKERSFIELD, CALIFORNIA
OIL Cl.ll SULFUR)
RETROFIT
396,000   SODIUM CARBONATE SCRUBBING
          IN-HOUSE DESIGN
                                                                                             1/79
MOBIL on. COMPANY
BUTTONHILLOW, CALIFORNIA
OIL Cl.lt SULFUR)
RETROFIT
80,500
                          SODIUM CARBONATE SCRUBBING
                          HFATER TECHNOLOGY
?/79
PHILLIP MORRIS, INC.
CHESTERFIELD, VIRGINIA
COAL
NEW
                39.000
                          SODIUM CARBONATE SCRUBBING
                          FLAKT, INC.
                                           6/79
ST. JOE ZINC CO.
MONACA, PENNSYLVANIA
COAL (2.5Z - a.51 SULFUR)
RETROFIT
                142,000   CITRATE PROCESS
                          BUREAU OF MINES
                                           3/79
SUN PRODUCTION COMPANY
FELLONS, CALIFORNIA
OIL C1.4Z SULFUR)
RETROFIT
                6,000
                          SODIUM HYDROXIDE SCRUBBING
                          C-E NATCO
                                           1/79
SUN PRODUCTION COMPANY
OILDALE, CALIFORNIA
OIL C1.2X SULFUR)
RETROFIT
                6,000
                          SODIUM HYDROXIDE SCRUBBING
                          C-t NATCO
                                           fl/79
TEXACO INCORPORATED
SAN ARDO, CALIFORNIA
OIL (1.7Z SULFUR)
RETROFIT        117,000   SODIUM CARBONATE SCRUBBING
                          DIICON COMPANY
                                           3/79

-------
                                                                             STATUS 10 .lAMiiAMY
                                            SECTION   7

                            PLANNED  FGD  SYSTEMS  ON  INDUSTRIAL  BOTLEMS
COHPANY/LOCATION/FUFL
                                     NE*/
                                  RETROFIT
              UNIT SIZE
               CSCFM)
                                PROCESS/VENDOR
                                        START-UP
                                          MO/YR
CARBORUNDUM ABRASIVES
BUFFALO, NEH YORK
COAL (3.2* SULFUR)
                                 RETROFIT
                50,000
          LIKE SCRUBBING
          CAKHORUNDIIM ENVTR. SYS. LTD.
CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS
COAL C3.2X SULFUR)
                                  NEh
                105,000
                          DOUBLE ALKALI  (CONCENTRATED)
                          FMC ENVIRONMENTAL EQUIPMENT
                                                            1/ftO
6RISSOM AIR FORCE" BASE
BUNKER HILL, INDIANA
COAL (0.« - 
-------
                                                                            STATUS  TO  JANUARY 1979

                                          Sf-CUOM  ft

              SUMMARY OF DISPOSAL PRACTICES 1-OH FRO SYSTEMS ON INDUSTRIAL BORERS
INSTALLATION NAME / LOCATION
                                    STATUS/COMMFNTS
ALKALINE SULFITE/8ISULFITF RECYCLED TO PULP PROCESS
MEAD PAPERBOARO CO.
STEVENSON, ALABAMA
NFKOOSA PAPERS, INC.
ASHOOKN, ARKANSAS
OPERATIONAL
KECOVFRFti SOLUTION USED AS MAKE-UP TO COOKING LIQUOR IN PULP
MILL.
OPERATIONAL
SO? RFCOVFREO FRO" SODIUM SULFITE/SULFATE LIQUOR AND RE-
CYCLED TO PULPING PROCESS.
DEWATERED SLURRY TO L»NDFILL
ARCO/POLYMFRS, INC.
MONACA. PENNSYLVANIA
BUNGE, INC.
CAIRO, ILLINOIS

CATERPILLAR TRACTOR CO.
EAST PEORIA, ILLINOIS

CATERPILLAR TRACTOR CO.
MOSSVILLE, ILLINOIS

CATERPILLAR TRACTOR CO.
JOLIET, ILLINOIS

CATERPILLAR TRACTOR CO.
MORTON, ILLINOIS

CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS

CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS

CHANSLOR WESTERN OIL * OEV. CO
BAKERSFIELD, CALIFORNIA

DUPONT, INC.
GEORGIA
CONSTRUCTION
FLYASH ADDITION TO DEWATEREO CAS03/CASO« FILTER CAKF.,
THEN TO LANDFILL.

INDEFINITELY SHUT DOWN
OPERATIONAL
60+* SOLIDS (CASOfl) SLUDGE DIRECTLY TO LANDFILL

OPERATIONAL
60+X SOLIDS (CAS04) SLUDGE DIRECTLY TO LANDFILL

OPERATIONAL
OPERATIONAL
CONSTRUCTION
60+t SOLIDS (CASOfl) SLUDGE DIRECTLY TO LANDFILL

PLANNED-CONTRACT AWARDED
60+X SOLIDS (CAS04) SLUDGE DIRECTLY TO LANDFILL.

CONSTRUCTION
SALTS IS THEREBY PREVENTED.
PLANNED-CONSIDERING S02 CONTROL
DUPONT,  INC.
TEXAS

FIRESTONE  TIRE  AND  RUBBER  CO.
POTTSTOWN,  PENNSYLVANIA

GENERAL  MOTORS  CORPORATION
TONOMANDA,  NEW  YORK
GENERAL  MOTORS  CORPORATION
PARMA, OHIO

GENERAL  MOTORS  CORPORATION
PONTIAC,  MICHIGAN

GRISSOM  AIR  FORCE  BASE
BUNKER HILL,  INDIANA

U.S.  GYPSUM  CORP.
OAKMQNT,  PENNSYLVANIA
PLANNED-CONSIDERING S02 CONTROL


OPERATIONAL
OPERATIONAL
FLY ASH AND NAaS03/SO« HASTE LIQUOR OEWATERED AND THEN TO
SAN]TARY LANDFILL

OPERATIONAL
50*Z SOLIDS (CAS03/S04) SLUDGE TO DRYING POND AND LANDFILL

OPERATIONAL
5X SOLIDS SLURRY DEWATERED AND TO LANDFILL

PLANNED-CONTRACT AWARDED
NEVER STAWTED-UP
SLUDGE TO POND FOR DRYING.  THEN TO LANDFILL.

-------
                                                                            STATUS TM JANUARY

                                     SECTION   8  (CONTINUED)

              SUMMARY OF DISPOSAL  PRACTTCFS  FOW FRO SYSTEMS ON INDUSTRIAL HfltlFRS
INSTALLATION NAME / LOCATION
                                     STATllS/COMMFNTS
HOLDING POND FOR EVAPOKAITOnl
AMERICAN THREAD co.
MARION, NORTH CAROLINA
Off NATIONAL
THt SODIUM StILFTTE/SULFATE rtASTE  LIQUOR  IS  PUMfFD  TO
A RED CLAY LINED ASH BASIN.   LEACHING  UF  THE  SOLUBLE  SODIUM
SALTS is THEREBY PREVENTED.
ARMCO STEEL
MTDDLFTOWN, OHIO

FMC (SODA ASH PLANT)
GREEN RIVER, WYOMING
SETTY OIL COMPANY
BAKERSFIELD, CALIFORNIA
KERR-MCGEE CHEMICAL CORP.
TRONA, CALIFORNIA
                                     OPFR4TIONAL
OPERATIONAL
NA5S03/S04 LIOUOR DISPOSED  TO  COLLECTION  PONO  -  NO  PRIOR
AERATION.  LANPFHL  IN  THE  FUTURE

OPERATIONAL
6 GPM BLtEOOFF TO A  SLOWDOWN TANK.   THE BLOWOOHN IS THEN
SENT TO A DISPOSAL PON!) ONCE A KEEK.

OPERATIONAL
SCRUBBER EFFLUENT IS CLARIFIED AND  THEN PUT  INTO A  MINERAL
DEPOSIT.
MOBIL OIL COMPANY
SAN ARDO, CALIFORNIA

MOBIL OIL COMPANY
BUTTONWTLLOW, CALIFORNIA

SUN PRODUHTION COMPANY
FELLOWS* CALIFORNIA

SUN PRODUCTION COMPANY
OILDALE, CALIFORNIA

TENNECO OIL CO.
GREEN RIVER, WYOMING
OPERATIONAL
CONSTRUCTION
INTERMITTENT BLOWDOWN TO  vKASTE  DISPOSAL  SITE.

CONSTRUCTION'
1 GPM BLEEOOFF TO DISPOSAL POND

CONSTRUCTION
1 GPM BLEEOOFF TO DISPOSAL POND

PLANNED-REQUEST ING/EVALUATING BIDS
NON-FIXATED SLURRY TO LINED POND
CANTON TEXTILES
CANTON, GEORGIA

RICKEN8ACKER AIR FORCE RASE
COLUMBUS, OHIO
OPERATIONAL
NA S03/S04 LIOUOR DISPOSED TO LINED HOLDING PONDS

OPERATIONAL
UNSTABIL1ZED CASOS/SOfl SLUDGE TO LINED POND
REGENERABLE - ELEMENTAL SULFUR PRODUCT
ST. JOE ZINC CO.
MONACA, PENNSYLVANIA
CONSTRUCTION
WASTEWATFR TREATMENT AND DISCHARGE  TO CITY  SEWFR
GENERAL MOTORS CORPORATION
ST. LOUIS, MISSOURI
GENERAL MOTORS CORPORATION
DAYTON, OHIO
GEORGIA-PACIFIC PAPER CO.
CROSSETT, ARKANSAS
OPERATIONAL
NAJS03 OXIDIZED TO NA3SO«, PH NEUTRALIZED AND DISCHARGED TO
CITY SEWFB SYSTEM

OPERATIONAL
NAaSOVSOl LIOUOR AT 35 GPM TO ON-SITF CLARIFICATION AND
OEKMFKING FACILITY

OPERATIONAL
                                              25

-------
                                                                           STATUS  TO  JANUARY  1979

                                             8  (CONTINUFOJ

              SUMMARY OF DISPOSAL PRACTICES FOK FRO SYSTEMS ON INDUSTRIAL BfllLF.HS
INSTALLATION NAME / LOCATION
                                    STATUS/COMMENTS
WASTEWATER TREATMENT AND DISCHARGE TO CITY SErfER
NORTHERN OHIO SUGAR COMPANY
FREEMONT, OHIO

NORTHERN OHIO SUGAR COMPANY
FINDLAY, OHIO
                                    OPERATIONAL
TERMINATED
BLEED-OFF STREAM TO HOLDING TANK
NASTEHATER TREATMENT AND DISCHARGE TO RIVER
GREAT SOUTHERN PAPER CO.
CEDAR SPRINGS, GEORGIA

GREAT WESTERN SUGAR
BILLINGS, MONTANA

GREAT WESTERN SUGAR
FORT MORGAN, COLORADO

GREAT WESTERN SUGAR
BERING, NEBRASKA
OPERATIONAL
CLARIFICATION FOLLOWED BY PONDING AND DISCHARGE TO RIVER

OPERATIONAL
OPERATIONAL
OPERATIONAL
EFFLUENT TO HOLDING POND
GREAT WESTERN SUGAR
GREELEY, COLORADO
GREAT WESTERN SUGAR
LOVELANO, COLORADO
GREAT WESTERN SUGAR
SCOTTS BLUFF, NEBRASKA
GREAT WESTERN SUGAR
LONSHONT, COLORADO
TRANSCO TEXTILES, INC.
AUGUSTA, GEORGIA
OPERATIONAL
OPERATIONAL
EFFLUENT STREAM TO HOLDING POND

OPERATIONAL
EFFLUENT STREAM TO HOLDING POND.

TERMINATED
INDF.FINI1ELY SHUT OOwN
NA2SOVSUO LllJUfW DISCHARGED TO A HOLDING POND
WASTEMATER TREATMENT AND DISCHARGE TO TAILINGS POND
CHEVRON U.S.A. INC.
BAKERSFIELD, CALIFORNIA

GETTY OIL COMPANY
BAKERSFIELD, CALIFORNIA
GETTY OIL COMPANY
BAKERSFIELD, CALIFORNIA
ITT RAYONIER,  INC.
FEHNANDINA BEACH, FLORIDA
OPERATIONAL
OPERATIONAL
HOLDING POND FOR EVAPORATION.
9 GPH BLEEOOFF TO A BLOWDOWN TANK.
INTO A DISPOSAL POND ONCE A WEEK.

CONSTRUCTION
MOLDING POND FOR EVAPORATION.
9 GPM 8LEEDOFF TO A SLOWDOWN TANK.
INTO A DISPOSAL POND ONCE A WEEK.

OPERATIONAL
                                                                         THE BLOWDOWN  IS  EMPTIED
                                                                         THE SLOWDOWN  IS  EMPTIED

-------
                                                                            STATUS  TO  JANUARY

                                    SECTION   «  (CONTINUED)

              SUMMARY OF DISPOSAL PRACTICES FOR  f-KD  SYSTEMS  ON  INDUSTRIAL  BOILERS
INSTALLATION NAME / LOCATION
                                    STATUS/COMMENTS
WASTEWATER TREATMENT
ALYESKA PIPELINE SERVICE CO.
VALDEZ, ALASKA
BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA

BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA

CARBORUNDUM ABRASIVES
BUFFALO, NEW YORK

CHEVRON U.S.A. INC.
BAKEBSFIELD, CALIFORNIA

MINN-OAK FARMER'S CO-OPERATIVE
HAHPETON, NORTH DAKOTA
8T. REGIS PAPER CO.
CANTONMENT, FLORIDA

TEXACO INCORPORATED
SAN AROO, CALIFORNIA
TEXAS6ULF
GRANGER, WYOMING
                                    OPERATIONAL
                                    NAaS03/HS03 AERATFO  TO NA?Sfia  AND  TRAKSFF.RRED  TO *AS TEhA TfcN
                                    TREATMENT PLANT AT A RATE OF  10  6PM.   IT  IS KIX60 «ITH ABOUT
                                    10,000 GPM OF BALLAST WATER FROM TANKERS  IN PORT VALDF.7.
                                    CLEANED fcATFR IS THFN ijISCHARGED INTO  PDHT VALOfZ.

                                    OPERATIONAL
                                    OPERATIONAL
                                    PLANNED-CONTRACT  AMHOEH
                                    PLANNED-REQUEST ING/EVALUATING  BTDS
                                    OPERATIONAL
                                    BLEED STREAM GOES TO  AN  ACTIVATED  SLUDGF  SYSTEM  3  160  GPM
                                    ANAEROBIC DIGESTION,  FOLLOWED  BY AN  OPEN  POND, FOLLOWED  BY
                                    AEROBIC DIGESTION.

                                    OPERATIONAL
                                    EFFLUENT IS TREATFD IN AN  ON-STTE  SFWAGF  TREATMENT  PLAMT

                                    OPERATIONAL
                                    HALF OF THE SCRUBBER  UNDERFLOW IS  TREATED AND  RECYCLED AS
                                    BOILER FEEDWATER; THE OTHER  HALF GOES  TO  WASTEWATER
                                    DISPOSAL WELLS.

                                    OPERATIONAL
OVERFLOW TO SEWER/SLUOGE TO LANDFILL
SHELLER GLOBE CORP.
NORFOLK, VIRGINIA
                                    INDEFINITELY SHUT DOWN
DISPOSAL TECHNIQUE NUT KNOWN
C.A.M.(CARBIDE-AMOCO-MONSANTO)
HOUSTON. TEXAS

HARRIS MINING co.
SPRUCE PINE, NORTH CAROLINA

SHELL OIL COMPANY
BAKERSFIELD, CALIFORNIA

SHELL OIL COMPANY
TAFT, CALIFORNIA
                                    PLANNED-CONSIDERING  SOa  CONTROL
                                     INDEFINITELY  SHUT  OOwN
                                    PLANNED-CONSIDERING  SO?  CONTROL
                                    PLANNED-CONSIDERING S02 CONTROL
SCRUBBER EFFLUENT DISPOSED OF  IN WASTE WEILS


                                    CONSTRUCTION
TEXACO INCORPORATED
SAN ARDO, CALIFORNIA

-------
                                                                             STATUS  tO  JANIIAHY  1979
                        nESCHlPIIIlN HIP  tlPfkAItuNAl  FGD  SYSTEMS  ON  IMDUSTKIAL  BOILEK5
 INSTALLATION NAHF
 INSTALLATION LOCATION
 SOURCE CHARACTERISTICS
 SOURCE RATING
 NUMBER OF SEPARATE  FG1  UNITS
 NUMBER OF B1ILERS BEING CONTROLLED
 SOURCE CAPACITY


 CONTROL  SYSTEM VENDOR
 CONTROL  PROCESS
 NEH  / RETROFIT
 START-UP 0*TE
 CONTROL  SYSTFf STATUS
 802  REMOVAL EFFICIENCY
 P»RTICUL*TE REMOVAL EFFICIENCY
 HATER MAKE-UP
 SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
ALYESKA PIPFLINF SERVICE ro.
VALOfZ, ALASKA
OIL (0.051 - 0.1X SULFUR)
SO,000 SCFC  (OFSIGN MAXIMUM)
25 MM (FOIJIVALENT)
(FOR THIS REPORT, UNLESS STATED OTHERWISE, aOOO SCFP =  1  EQUIVALENT
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  MODULE  SIZIN6
FMC ENVIRONMENTAL EQUIPMENT
SODIUM HYDROXIDE SCRUBBING
NEW
JUNE, 1977
OPERATIONAL
96+X (150-160 PPM 9 INLET)
PARTICULATE EMISSIONS MEET NSP3.
2 GPM - OPEN LOOP
HASTFHATER TREATMENT
NA2S03/HS03 AERATED TO NA2S04 AND TRANSFERRED TO  NASTEMATER
TREATMENT PLANT AT A RATE OF 10 GPM.   IT  IS MIXED KITH  ABOUT
10,000 GPM OF BALLAST MATER FROM TANKERS  IN PORT  VALOEZ.
CLEANED WATER IS THEN DISCHARGED INTO  PORT VALDEZ.
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                      BACKGROUND INFORMATION
     AT THE VALDEZ TERMINAL UF THE ALASKAN OIL PIPELINE, ALYESKA PIPELINE SERVICE COMPANY OPERATES
THE OIL STORAGE AND TRANSFER FACILITY.  OIL FLOWING IN FROM THE PIPELINE IS TEMPORARILY STORED IN
SEVERAL HUGE TANKS, THEN TRANSFERRED FROM THE TANKS TO OIL TANKER SHIPS IN NEARBY PORT VAIDE?.
ALYESKA NEEDED NEUTRAL BLANKET AIR FOR THE OIL STORAGE TANKS. A LOW OXYGEN CONTENT BEING PARTICULAR-
LY DESIRABLF.  IT HAS DETERMINED THAT ON-SITE BOILER FLUE GAS HOULD HAVE THE REQUIRED LOW OXYGEN
CONTENT.  CORROSION PREVENIION JN THE OIL STORAGE TANKS DICTATED THE NEED FOR S02 CONTROLS.
THAT IS, THE DEVICE HAS NOT INSTALLED TO MEET AN EMISSIONS REGULATION.  NEVERTHELESS, THE
"INERT GAS" SYSTEM IS BASICALLY A SODIUM HYDROXIDE FGD SYSTEM AND HAS DESIGNED AND INSTALLED BY
FMC ENVIRONMENTAL EQUIPMENT DIVISION.
     THE BOILERS 00 NOT OPERATE AT STEADY STATt CONDITIONS.  THIS IS DUE TO THE FACT THAT *HE* OIL
IS REMOVED FROM THE TANKS  AT  A FASTER fcATF THAN rT IS BFING FFD BY THE PIPELINE, AN ADDITIONAL INERT
AIR BLANKET IS NEFDFD.  THIS  REOUIRFS INCREASING THF BOILER LOAD FROM THE NORMAL LEVEL OF PLANT
POHER PRODUCTION TO HUN THf COMPRESSORS AND  PRODUCE ADDITIONAL GAS FOR BLANKET PRODUCTION.

-------
                                                                              STATUS  in  JAC'HAPY



                                      SECTION   
-------
                                                                             STATUS TO JANUAHY 1
-------
                                                                              STATUS  T"  JANUARY  1979
                                      SECTION  9  (CONTINUED)
             PERFORMANCE DESCRIPTION FOR
                                                     FGD SYSTEMS on  INDUSTRIAL  BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATIN6

  NUMBER OF SEPARATE F.GO UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY





  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEN / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  S02 REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
AMERICAN THHF.AO CO.

MARTliN, NORTH CAROLINA

COAL (1 - I.5X SULFUR)

18,500 SCFM (TOTAL - Z ROTLERS)

 2

 2

9 MW (EQUIVALENT);  TOTAL 3 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EQUIVALENT MX.
THIS IS BECAUSE GAS FLOW KATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

W.W. SLY MANUFACTURING CO.

CAUSTIC WASTE STREAM

RETROFIT

1973

OPERATIONAL

70X (500 PPM a INLET)

971                           ,

HOLDING PONO FOR EVAPORATION

THE SODIUM SULFITE/SULFATE HASTE LIOUOR IS PUMPED TO

A RED CLAY LINED ASH BASIN.  LEACHING OF THE SOLUBLE SODIUM

SALTS IS THEREBY PREVENTED.

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION

    AMERICAN THREAD COMPANY, LOCATED IN MARION, NORTH CAROLINA OPERATES  TWO  COAL-FIRED BOILERS, EACH
I
HITH A DESIGN CAPACITY OF 30,000 ACFM 3 100 F.  DURING THE WINTER MONTHS  ONF BOILER  IS OPERATED

7 DAYS/NEEK AT 75Z LOAD AND THE OTHER OPERATED 5 OAYS/WFEK ALSO AT 75X LOAD. BOTH BOILERS

OPERATE 5 DAYS/MEEK AT 50Z LOAD DURING THE SUMMER MONTHS.

    THE SCRUBBERS HERE SUPPLIED BY W.M. SLY MANUFACTURING CO. AND WERE ORIGINALLY INSTALLED  TO CON-

TROL PARTICULATE.  EACH IS CONSTRUCTED OF 30« SS AND 316 SS HITH SPRAY NOZZLES OF 30<1 SS.  FACH

SCRUBBER IS 10 FEET IN OIAMFTES AND 12 FEFT HIGH WITH TWO SPHAY LEVELS AND HAS A PRESSURE DROP OF

& IN. K.C. AT FULL LOAD.  THE FLUE GAS ENTERS EACH SCRUBBER AT A RATE OF  30,000 ACFM 9 350 F AND

LEAVES AT 160 F.

THE SCRUBBING LIQUOR IS A 7X CAUSTIC WASTF STREAM FROM A MERCFRIZINK STFP IN  WHICH THREAD IS CLEANFO

»ND SHRUNK.  THE CONTROL PH IS 8.5 IN THE RtCIHCIILATION TANK.  SPENT LtOUOR  ENTERING THE TANK IS AT

* PH OF 2.5.  THE SCRUH9F.RS HAVE BEEN EXHIBITING 901 RFLI ABILITY.  RECIRCULATTUIM AND Si MORF HAND-

LING PUMPS ARF MADE OF RIJBBFR-LINED CAST TRflN.

    A 35-flOX BLEED STREAM FROM THE RFCIRCULAT TON TANK REMOVFS WASTF. SOLIDS Til AN ASH PONO FOB SET-

TLING.
                                                31

-------
                                                                             STATUS TO JANUARY  1979
                                      SECTIOM  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERAT tONAl. FGH SYSTFMS ON INDUSTRIAL BOILF.KS
AMERICAN THRFAD CO.; MARION, NORTH CAROLINA (CONTINUED)
    REFER TO FIGURE \9-? IN SECTION 11 FOR A Df-TAILFO PROCESS FLOW DIAGRAM OF THIS SYSTEM.

                                         OPERATING HISTORY
2ND OIIARTER-197«    PLANT RFPORTS THAT IT IS STILL EXPERIENCING SCRUBBER I.D. FAN PROBLEMS DUE  TO
VIBRATION AND CORROSION.  TO OVERCOME THIS PROBLEM, PLANS ARE BEINC MADE TO ELIMINATE THE I.D.  FANS
ON THE SCRUBBER AND UPGRADE BOILER I.D. FANS.
    OTHER PROBLEMS HAVE BEEN AS FOLLOWS:
      1. VIBRATION CRACKS IN PVC PIPINS.
      2. FAILURE OF PUMP RUBBER LINING.
      3. THF NEFO TO DRAIN THE HECIRCULATION TANK AND PAINT IT WITH EPOXY PAINT TO ALLEVIATE
         CORROSION PROBLEMS.

3RD QUAHTER-1978    THE VIBRATION CRACKS IN THE PVC PIPING ARE LOCATED AT THE ENTRANCE TO THE SCRU-
BBER AND MERE CAUSED BY AN UNBALANCED FAN.   THE FAN BECAME UNBALANCED WHEN ITS FIBERGLASS COATING
WAS ERODED AWAY.  TWO WEEKS WERE REQUIRED TO PATCH THE COATING.  THE CRACKED PIPE SECTIONS WERE RE-
PLACED.   PLANS ARE BEING MADE TO REMOVE THE SCRUBBER 1.0. FAN COMPLETELY FROM THE SYSTEM AND TO
UPGRADE THE EXISTING BOILER 1.0. FAN SO THAT IT HAS THE CAPACITY TO OVERCOME THE SCRUBBER SYSTEM
PRESSURE DROP.
    THE REPLACEMENT OF A PUMP LINING CAUSED THREE DAYS DOWNTIME.
    EPOXY PAINT USED ON THE RECIRCULATION TANK MAS INEFFECTIVE.  ONE-HALF INCH PLATES MERE WEL-
DED TO THE TANK TO PATCH HOLES CAUSED BY THE CORROSIVE LIQUOR.  THE SCRUBBER WAS DOWN FOR A WEEK.
CORROSION OF PRESSURE GAUGES AND COPPER LINFS HAS ALSO BEEN A PROBLEM AREA.

4TH QUARTER-I978   DURING THE REPORT PERIOD THE BOILERS OPERATED 5 DAYS/MEEK, 24 HOURS A DAY.   THE
PATCH-UP WORK ON FIBERGLASS COATING OF ID FAN ROTORS CAUSED TWO DAYS OF SCRUBBER DOWNTIME.  FOUR OF
THE LOWER LEVEL SPRAY NOZZLES (304 SS) EXPERIENCED EROSION DUE TO THE ABRASIVE FLYASH AND WERE
REPLACED.  RECIRCULATION TANKS AND PUMPS HAD NO OPERATING PROBLEMS.  THE RELIABILITY INDEX OF
SCRUBBERS IMPROVED TO A VALUE OF ABOUT 96X.
                                                 32

-------
                                                                              STATUS  TO  JANUARY  1979
                                      SFCT1HM  9  (CONTTNUFDl
             PERFORMANCE DESCRIPTION FOR flPtHAITnNAI FGH  SYSTEMS  ON  TNDIISTRIAI  HdlLFRS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING

  NUMBER OF SEPARATE FGO UNITS
  NUMBER OF BOILERS BEING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  303 REMOVAL EFFICIENCY
  SLUDGE OR BY-PROOUCT DISPOSAL
  CONTROL SYSTEM COST
AR«CD STfFL
MIOniF.TOnN, OMin
COAL (O.aZ SULFUR)
HO.OOO SCFM (TOTAL - 2 HOILERS)
SOO.dOO LB/HH STEAM (TOTAL)
 1
 2
02 M* (EQUIVALENT): TOTAL - 2 BOILERS
(FOR THIS REPORT, UNLESS STATED OTHERWISE. 3000 SCFK = 1 EQUIVALENT Mh.
THIS IS BECAUSE GAS FLOM RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
KOCH ENGINEERING
LIME SCRUBBING
RETROFIT
1975
OPERATIONAL
NOT AVAILABLE
HOLDING POND FOR EVAPORATION
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION
    ARMCO STEEL. MIDDLE TOWN OPERATES TWO MULTI-RETORT, UNDERFEED  STOKER.  COAL-FIRED  BOILERS, EACH
WITH A CAPACITY OF 100,000 LBS/HH STEAM.  THE COAL BURNED  IS TYPICALLY  0.7J  TO  0.9X  SULFUR  AND
8% TO 10X ASH.  INITIALLY THE BOILERS HERE OPERATED  IN THE WINTER MONTHS  ONLY,  HOWEVER  BEGINNING
IN 1976, OPERATIONS WERE YEAR-ROUND WITH REDUCED CAPACITY DURING  THE  SUMMER.
    THE CONTROL SYSTEM CONSISTS OF A VARIABLE-THROAT VENTURI SCRUBBER WITH A  PRESSURE DROP-CONTROL-
LED, ADJUSTABLE PLUG.  IMMEDIATELY DOWNSTREAM FROM THE VENTURI  IS AN  ABSORBER MODULE 17 FEET IN
DIAMETER WITH THREE GAS SCRUBBING TRAYS, *N S-TYPE CHEVRON MIST ELIMINATOR AND  A  106-INCH DIAMETER
STUB STACK.  THE SYSTEM IS DESIGNED TO HANDLE 110,000 ACFM AT 425 F AND IS INCHES WG WITH AN
OUTLET LOADING OF 0.02 GR PFR SCFD.  FRESH WATER IS SUPPLIED FROM CLARIFIED RIVER WATFf* AT  THE
RATE OF 1600 GPM TO THE TOP TRAY AND VENTURI THROAT.  A LIME SLURRY IS  ADDED  IN A 10,000 GALLON
RECYCLE TANK WHICH HOLDS EFFLUENT FROM THE ABSORBER MODULE.  THE  DESIGN L/G RATIO IS 11.fl GALLONS
PER 1000 ACF.
    A PH OF APPROXIMATELY 7 IS MAINTAINED IN THE RFCYCLE TANK.  IF PH VABTES  "ORE THAN TWO-TENTHS
OF A PH UNIT (6.0-7.2), A LIGHT/BU7ZER ALERTS THE OPERATORS WHO ADJUST  THF PH BY OPFNING OR
CLOSING A VALVE LEADING FROM THF LIMfr SLURRY HOLDING TANK TO THE  RECYCLE  TANK.
   THE LARGEST PROBLEM AFFECTING SCRUBBER PERFORMANCE HAS BEEN CONTROL OF EXCESS AIR IN THE BPILFRS.
WITHOUT CONTROL, EXCESS AIR RESULTS IN 1.5 TO 3 TIMES THE SCRUBBER DESIGN FLOW RATE.  THESF HIGH
EXCESS AIR HftTFS ALSO PFSULt IN THt PRESENCE OF UNHIWNEO CARbON WHICH COULD NOT HE SCRUBBED AND
                                                33

-------
                                                                             STATUS TO JANUARY  1<»7<>





                                      SFCTION  
-------
                                                                              STATUS  TO  JANIIAKY  1979




                                      SECTION  9  (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL F6D  SYSTEMS  ON  INDUSTRIAL  BOILEHS




ARMCO STEFLJ MIODLETOWN, OHIO (CONTINUED)






 *   THE EXCESS AIR PROBLEM HAS BEEN REDUCED TO ABOUT flOX  BY  PATCHING  LEAKS  FOUND  ON  THE  BORER  AMt>




REDUCING THE COMBUSTION AIR TO THE BOILER.  HOWEVER, DUE  TO  THE AGE  AND  CONDITION OF THE BOILER




IT IS NOT LIKELY THAT THE EXCESS AIR WILL BE REDUCED FURTHER.  THF BOILER  IS  OPERATED AN ESTIMATED




10 MO/YR.  THE SCRUBBED NORMALLY OPERATES APPROXIMATELY 2 TO  3 MONTHS BEFORF  IT HAS  TO  BE SHUT  DOWN




FOR REPAIRS.  THE PLANNED PROPORTIONAL LIME SLAKER WAS NEVER  INSTALLED.









4TH QUARTER-1978    ABRASION CONTINUES TO BE A MAJOR PROBLEM.  NO OTHER  INFORMATION  MAS  MADE  AVAIL-




ABLE AT THIS TIME DUE TO POSSIBLE LITIGATION CONCERNING NEWLY PROPOSED EMISSION STANDARDS.   THE  NEW




STANDARDS ARE BEING SET ON A STACK-BY-STACK BASIS.
                                                3"5

-------
                                                                             STATUS TO JANUARY 1979


                                      S^CTI.JN  0 (CflNTINUFO)

             PEHFORM.NCE DESCRIPTION FO* OPERA! TONAL FGf) SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING



  NUMBER OF SEPARATE FGO UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY
  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEM / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  802 REMOVAL EFFICIENCY

  MATER MAKE-UP

  SLUDGE OR BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
BfLRIOGE OIL CO.

MCKITTRICK, CALIFORNIA

OIL U.I* SULFUR)

12,000 SCFH (1 BOILER)

20,000 ACFM d 570 F

 1

 1

6 MM (EQUIVALENT)

50 MM BTU/HR

(FOR THIS REPORT, UNLESS STATED OTHERWISE. 2000 SCFM = 1 EQUIVALENT  K
THIS IS BECAUSE 6AS FLOM RATE IS THE PRIMARY FACTOR IN MODULE  SIZING.

HEATER TECHNOLOGY

SODIUM HYDROXIDE SCRUBBING

NEH

JUNE, 1978

OPERATIONAL

90* (500 PPM 802 AT INLET)

15 GPM

MASTEHATER TREATMENT

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

     BELRIOSE OIL COMPANY HAS AN ENHANCED OIL RECOVERY SITE IN MCKITTRICK, CALIFORNIA.  THERE ARE

SEVERAL SMALL STEAM GENERATORS, EACH RATED AT 50 MM BTU/HR, WHICH BURN. A PART OF THE OIL PRODUCED

BY THE RECOVERY OPERATIONS.  THE CRUDE OIL HAS 1.1 PERCENT SULFUR.

     THE F6D SYSTEM, WHICH MAS SUPPLIED NEH BY HEATER TECHNOLOGY IM JULY 1978, TREATS A FLUE GAS

FLOM OF 24,000 ACFM AT 570 F.  THE SYSTEM CONSISTS OF AN EDUCTOR-TYPE VENTURI MOUNTED ON ONE SIDE

OF A RECYCLE TANK, AND A STUB STACK MOUNTED ON THE OTHER.  THE VENTUHI HAS AN ADJUSTABLE DISK, WHICH

FORMS THE CONTACT STAGE FOR THE GAS AND RECIRCULATIN6 LIQUOR.  THE GAS THEN FLOWS THROUGH THE MIST

ELIMINATOR HOUSED INSIDE THE STUB STACK.  THE LIQUOR. DISENGAGED FROM THE GAS, IS RECIRCULATEO WITH

A CONSTANT BLEED-OFF OF 10 6PM.  THE DESIGN L/G RATIO IS «0 GAL/1000 ACF.  THE PROCESS USED IS

SODIUM HYDROXIDE SCRUBBING AND FRESH CAUSTIC MAKEUP IS ADDED TO THE RECYCLE TANK.  THE VENTURI

SECTION, CONTACTING DISC, RECIRCULATING PIPING AND THE RECIRCULATING PUMP ARE MADE OF 3»6L SS.  THE

RECYCLE TANK IS CARBON STEEL MITH EPOXY TAR COATING AND THE MIST ELIMINATOR IS FRP.  THE PRESSURE

DROP ACROSS THE ENTIRE SYSTEM IS LESS THAN THE VACUUM CREATED BY THE EOUCTOR, ABOUT 1 IN. *.G.

     THE BLEED-OFF STREAM IS TAKEN TO WASTEWATER TREATMENT.  IN ADDITION, IT IS NECESSARY TO BLOW

DOMN FROM THF RECYCLE TANK INTERMITTENTLY.

-------
                                                                              STATUS  Tft  JANUARY  |
-------
                                                                             ST»TUS TO JANUARY 1979

                                      SECTION  9 (CONTINUED)

             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING



  NUMBER OF SEPARATE F6D UNITS

  NUMBER OF BOILERS SEINE CONTROLLED

  SOURCE CAPACITY
  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NED / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  802 REMOVAL EFFICIENCY

  N»TEH MAKE-UP

  8LUO6E OR BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
BELRIOGE OIL CO.

MCKITTRICK, CALIFORNIA

CRUDE OIL (1.1* SULFUR)

13,000 SCFM

24,000 ACFM a 570 F

 1

 1

5000 LB/HR STEAM

6 MM (EQUIVALENT)

50 Ml* BTU/HR; 50,000 LB/HR STEAM

(FOR THIS REPORT, UNLESS STATED OTHERWISE. 2000 SCFM = 1 EQUIVALENT  MW.
THIS IS BECAUSE GAS FLO* RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

THERMOTICS INC.

SODIUM HYDROXIDE SCRUBBING

NEM

JULY, 1978

OPERATIONAL

90Z (500 PPM S02 3 INLET)

15 GPM

WASTEWATER TREATMENT

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

     BELRIDGE OIL COMPANY HAS AN ENHANCED OIL RECOVERY SITE IN MCKITTRICK, CALIFORNIA.  THERE ARE

SEVERAL SMALL STEAM GENERATORS, EACH RATED AT 50 MM BTU/HR, WHICH BURN A PART OF THE OIL PRODUCED

BY THE RECOVERY OPERATIONS.  THE CRUDE OIL HAS 1.1 PERCENT SULFUR.

     TH§ FGD SYSTEM, WHICH WAS SUPPLIED NE* BY THERMOTICS INC. IN JULY 1978, TREATS A FLUE GAS

FLO* OF 2«,000 ACFM AT 570 F.  THE SYSTEM CONSISTS OF AN EOUCTOR-TYPE VENTURI MOUNTED ON ONE SIDE

OF A RECYCLE TANK, AND A STUB STACK MOUNTED ON THE OTHER.  THE VENTURI HAS AN ADJUSTABLE DISK, WHICH

FORMS THE CONTACT STAGE FOR THE GAS AND RECIRCULATING LIUUOR.  THE GAS THEN FLOWS THROUGH THE MIST

ELIMINATOR HOUSED INSIDE THE STUB STACK.  THE LIQUOR, DISENGAGED FROM THE SAS, IS RECIRCULATED WITH

A CONSTANT BLEED-OFF OF 10 6PM.  THE DESIGN L/G RATIO IS «0 GAL/1000 ACF.  THE PROCESS USED IS

SODIUM HYDROXIDE SCRUBBING AND FRESH CAUSTIC MAKEUP IS ADDED TO THE RECYCLE TANK.  THE VENTURI

SECTION, CONTACTING DISC, RECIRCULATING PIPING AND THE RECIRCULATING PUMP ARE MADE OF J16L SS.  THE

RECYCLE TANK IS CARBON STEEL WITH EPOXY TAR COATING AND THE MIST ELIMINATOR IS FRP.  THE PrtESSUR*

DROP ACROSS THE ENTIRE SYSTEM IS LESS THAN THE VACUUM CREATED BY THE EDUCTOR, ABOUT 1 IN n.G.

     THE BLEED-OFF STREAM IS TAKEN TO WASTEHATER TREATMENT.  IN ADDITION, IT IS NECESSARY TO BLOW

DOWN THE RECYCLE TANK  INTERMITTENTLY.

-------
                                                                               STATUS  Tf>  JANUARY  1979




                                       SECTION  9  (CONTINUED!




              PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS  DN  INDUSTRIAL  HOILFRS




 8ELRI06E OIL CO.? MCKITTRICK, CALIFORNIA (CONTINUED)






      THE F6D SYSTEM HAS THE ADVANTAGES OF SIMPLE DESIGN AND NO REQUIREMENT  OF  A FAN.  ON  THE  (1THFK




_HANO, THE COCURRENTf SINGLE-STAGE CONTACT NECESSITATES HIGH PH (AflOUT  8.0)  IN  THE  RECIRULATING  LOOP




 IF THE SO? REMOVAL IS TO EXCEED 90 PERCENT.  THIS LEADS TO HIGHER CONSUMPTION  OF THE  ALKALI.   THE




 INTERMITTENT" SLOWDOWN OF THE RECYCLE TANK RESULTS IN CORRESPONDING GENERATOR  DOWNTIME.






                                           OPERATING HISTORY




 3RD aUARTER-l<»78   SINCE FGD SYSTEM START-UP ON JULY 6, 197B  THF  SCRUBBER HAS  EXPERIENCED




 APPROXIMATELY 1 1/2 WEEKS OF DOWNTIME.  MAJOR PROBLEMS HAVE BEEN  FAULTY  RELAYS IN  THE INSTRUMENTA-




 TION, AND PUMP FAILURE.  THE RECIRCULATION PUMP WAS REPLACED.









 «TH OUARTER-1978   THE SCRUBBER OPERATED 96 DAYS OUT OF 105 DAYS  OF  GENERATOR  OPERATIONS.  THIS




 CORRESPONDS TO AN AVAILABILITY OF 93 PERCENT.  F.LECTRICAL CONNECTION MALFUNCTIONS  AND LEAKS IN




 CAUSTIC FEED LINE WERE THE MAJOR PROBLEMS.  THE RECIRCULATION PUMP SEAL  REQUIRED REPLACEMENT.

-------
                                                                             STATUS TO JANUARY 1979

                                      SF'.jOM  9 (COK'TIMIFD)
             PFRFOSMAMCE  DESCRIPTION FOP OPE&A1IONAL fGn SYSTEMS ON INDUSTRTAl  BOILERS
  INSTALLATION  NAME
  INSTALLATION  LOCATION
  SOURCE  CHARACTERISTICS

  SOURCE  BATING
  NUMBER  IF  SFPARATE FGO UNITS
  NUMBER  OF  HHILFRS  BEING CONTROLLED
  SOURCE  CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  S02 REMOVAL EFFICIENCY
  PARTICULATE REMOVAL EFFICIENCY
  WATER  MAKE-UP
  SLUDGE  OR BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
CANTON TtHTTLES
CANTON, GEORGIA
COAL (O.flT SULFUR)
}NTERRUPTIBLE NAtUKAL GAS
35,000 SCFM (1 BOILER)
 1
 1
13 Mh (E8UIVALENT)
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EQUIVALENT  MM.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

FMC ENVIRONMENTAL EQUIPMENT
CAUSTIC WASTE STREAM
RETROFIT
JUNE. 1971
OPERATIONAL
70X (500 PPM 9 INLET)
80X - SOX (5.92 LB/MM BTU AT INLET)
OPEN LOOP
NON-FIXATED SLURRY TO LINED PONO
NA S03/S01 LIOUOK DISPOSED TO LINED HOLDING PONDS
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
   CANTON TEXTILE MILLS IN CANTON, GEORGIA HAS A 13 HW  (EQUIVALENT) STEAM BOILER WHICH FIRES COAL
FROM OCTOBER TO MAY AND INTERRUPT ISLE NATURAL 6AS THE REMAINDER OF THE YEAR.  THE BOILER IS A COM-
BUSTION ENGINEERING (C-E) VERTICAL UNIT EQUIPPED «ITH A CYCLONIC DUST COLLECTOR.  THE OUST COLLECTOR
CAPTURES APPROXIMATELY 75 TO 100 POUNDS OF FLY ASH PER  HOUR.  THE TYPICAL COAL BURNED HAS A SULFER
CONTENT OF 0.8 PERCENT AND AN AS-RECEIVED HEAT VALUF OF 13,600 BTU PER POUND OF COAL. SULFER DIOXIDE
CONCENTRATION IN THE FLUE GAS IS 500 PPM WITH A PARTICULATE LOADING OF 5.93 LB/MM BTU.
    THE FBO SYSTEM, UFSIGNEO BY R.S. NOONAN, INC., CONSISTS OF AN FMC MEDIUM ENERGY, VENTORI-TYPE
SCRUBBER MADE OF 31&L SS AND A SEPARATOR (8 FT OIA X 12 FT HIGH) OF FRP.  THE FLUE GAS ENTERS THE
VENT1IRI (PRESSURE DROP-6 TO 12 IN W.G.) AT A RATE OF 02,000 ACFM 9 «30 F THROUGH A 30 HP. BUFFALO
FORCE FD FAN.  THE DUCTING LEADING TO AND FROM THE SCRUBBER IS HADE OF I/a IN. 316L SS, AND FRP
RESPECTIVELY.  THE FLUE GAS LEAVES THE SYSTEM THROUGH AN FRP STACK.  DYEING WASTE WATER CONTAINING
SODIUM SULFATE WITH A PH W APPROXIMATELY 10.5 10 12 IS THE SCRUBBING LIQUOR.  THE SCRUBBING LIQUOR
IS INJECTED IWTO THF. FLUE GAS STREAM THROUGH 1 IN. DIA. 316L SS SPRAY NOZZELS AHEAD OF THE VENTURI
THROAT.  THF WASTEwATFR  IS COLLECTED IN AN EQUALIZATION BASIN.  DEPENDING ON THE DESIRED DEGREE OF
NEUTRALIZATION.  THE BASTEWATER IS  THEN RtCYClEU  TO THF  SCRUBBER OR PUMPED TO THF WASTEWATFR TREAT-
                                                 40

-------
                                                                              STATUS TO JANUARY  1979




                                      SECTION  9  (CONTINUED)




             PERFORMANCE DESCR1PIIUN FOR OHtRAIIONAL FGf> SYSTFMS ON  INDUSTRIAL BOILEkS




CANTON TEXTILES; CANTON, GEORGIA  (CONTINUED)






MENT FACILITY.  A PH LEVEL OF 8.0  IS OBTAINED  IN  TMF FRP RECIRCULATTON  TANK.  THE  ALI  IS CHALMERS RE-




CIRCULATIDN PUMP IS MADE OF RUBBER LINED CAST  IRON WHILE DYE RETENTION  TANK  IS OF  CONCRETE.









                                        OPERATING HISTORY




    SEVERAL OPERATIONAL PROBLEMS WERE ENCOUNTERED UPON  INITIAL STARTUP.   A SEVERE  PLUGGING PROBLEM




WAS ENCOUNTERED IN SEVERAL PUMPS DUE TO THE PRESENCE OF COTTON FIBERS  IN  THE  KASTEwATER.  A SCREEN




BASKET AROUND THE INITIAL SCRUBBER SYSTEM  INTAKE  PIPE IN THE OYE COLLECTION  MANHOLE HAS BEING USED




TEMPORARILY UNTIL FURTHER INVESTIGATION IS COMPLETED.   SURFACE-ACTIVE  AGENTS  IN  THE DYEING WASIE-




WATERS WHICH PRODUCE FOAMING IN THE SCRUBBER PUMP WERE  DETECTED AND  A  OEFOAMER ADDITIVE IS NOW




INJECTED INTO THE SCRUBBER FEED FROM THE DYE RETENTION  BASIN.  FOULING  OF THE PH PROBES AND MIST




CARRYOVER ARE OTHER PROBLEM AREAS  THAT HAVE BEEN  INVESTIGATED.




     REFER TO FIGURE 14-5 IN SECTION 1« FOR A  DETAILED  PROCESS FLOW  DIAGRAM  OF THIS SYSTEM.









                                           OPERATING HISTORY




3RD OUARTER-1977    NO OPERATIONAL PROBLEMS WERE  REPORTED DURING THIS  SURVEY  PERIOD.  THE PLANT




REPORTED THE SYSTEM WAS rfOKKJNG SATISFACTORILY.   THE PLANT WAS BURNING  NATURAL GAS BUT EXPECTED




TO RETURN TO COAL DURING THE HEATING SEASON (DECEMBER-MAY).






1TH QUARTFR-1977    THE PLANT STARTED BURNING  COAL AND  OPERATING THE SCRUBBER 100  PERCENT OF THE




TIME IN MID-OCTOBER.  NO OPERATIONAL PROBLEMS  KERF ENCOUNTERED DURING  THIS PERIOD.






1ST QUARTER-1978    THE SCRUBBER DEMONSTRATED  AN  OPERA8ILITY OF 100X.






2ND OUARTER-1978    THE SCRUBBER WAS SHUTDOWN  IN  MID-MAY WHEN GAS FIRING  RESUMED FOR  SUMMER.  COAL-




FIRING WILL RESUME IN MID-OCTOBER.  DURING COAL-FIRED OPERATIONS IN  1977  AND  1978, THE SCRUBBER RAN




AT A 100X OPERABILITY.









3RD QUARTER-197B    NO UPDATE INFORMATION WAS  AVAILABLE FOR THIS REPORT PERIOD.









«TH QUARTER-1978    COAL FIRING RESUMED IN MID-OCTOBER, AND WILL CONTINUE FOR THE  REST OF WINTER




MONTHS.  DURING THIS SURVEY PERIOD (6 DAYS PER WEEK), THE SCRUBBERS OPERATED  AT  99X RELIABILITY.




THE DOWNTIME OF 10 HOURS WAS CAUSED BY BUILD-UP OF ABRASIVE FLYASH IN THE SCRUBBER.  THE INTERIOR OF




THE SCRUBBER WAS THEN CLEANED.  THE 316L SS DUCTWORK ENTERING THE SCRUBBER IS AFFECTED BY FLYASH




EROSION AND *ILL BE REPLACED WITHIN A YEAR.  NO OTHER OPERATING PROBLEMS WERE REPORTED.

-------
                                                                             STATUS TO JANUARY 1179

                                      SECTION  <» (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTFMS ON INOUSTRIAI  BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE  CHARACTERISTICS

  SOURCE  RATING



  NUMBER  OF  SEPARATE FED UNITS

  NUMBER  OF  BOILERS BFIN6 CONTROLLED

  SOURCE  CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEK / RETROFIT

  START-UP OATE

  CONTROL SYSTEM STATUS

  302 REMOVAL EFFICIENCY

  SLUD6E  OR BY-PRODUCT DISPOSAL



  CONTROL SYSTEM COST
CATERPILLAR TRACTOR CO.

EAST PEORIA, ILLINOIS

COAL (3.21 SULFUR)

210,000 SCFM (TOTAL - 1 BOILERS)

80,000 ACFM a 350 F, FOR EACH OF « FGO SYSTEMS

 a

 a

105 MW (EQUIVALENT)S TOTAL - « BOILFRS

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EQUIVALENT  MW.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE  SIZING.)

FMC ENVIRONMENTAL EQUIPMENT

DOUBLE ALKALI (CONCENTRATED)

Z NEW, 3 RETRO

APRIL, 1978

OPERATIONAL

901 (2,000 PPM 3 INLET)

DEWATERED SLURRY TO LANDFILL

f>0+* SOLIDS (CAS04) SLUDGE DIRECTLY TO LANDFILL

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

    THE CATERPILLAR TRACTOR COMPANY PLANT LOCATED IN EAST PEORIA, ILLINOIS HAS FOUR COAL-FIRED

BOILERS. Tun OF THE BOILERS ARE RATED AT 200,000 POUNDS OF STEAM PER HOUR AND THE REMAINING TnQ ARE

RATED AT 810,000 POUNDS OF STEAM PER HOUR.  THE COAL BURNED IS ILLINOIS COAL WITH A HEATING VALUE

OF 10,500 BTU/LB AND AN AVERAGE SULFUR CONTENT OF 3.21.  THE TOTAL BOILER CAPACITY IS ABOUT 100 MW

(EQUIVALENT).  MECHANICAL COLLECTORS ARE USED FOR PRIM»RY PARTICIPATE CONTROL.  GASES EXHAUST

THROUGH A L'INEO STACK WHICH IS APPROXIMATELY 175 FT TO 180 FT HIGH.  THE STACK CONSISTS OF TWO

KIDNEY SHAPFf) FLUES EMBODIED WITHIN ONF OUTER SHELL.

    THE AIR QUALITY CONTROL SYSTEMS HAVE BEEN SUPPLIED BY FMC ENVIRONMENTAL EQUIPMENT DIVISION.

THERE IS ONE SCRUBBER TRAIN FOR EACH OF THE FOUR BOILERS, WHICH CONTROLS BOTH PAHTICULATE AND 802

EMISSIONS FROM ABOUT 90,000 ACFM q «2S F.  THE FOUR FGO SYSTEMS SHARE COMMON REGENERATION

FACILITIES, VACUUM FILTERS, AND SLUDGE DISPOSAL.

     REFER TO FIGURE lfl-7  IN SECTION Id FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.
                                         OPERATING HISTORY

4TH QUARTER-1977    START-UP WAS  SCHEDULED  FOR M»RCH  1978 AND CONSTRUCTION WAS PROGRESSING SMOOTHLY.


1ST nUARTFR-l"78    CONSTRUCTION  flF  THE  FOUR  F&O  SYSTEMS WAS COMPLETED.  START-UP HAS DELAYED DUE

-------
                                                                              STATUS TO .lAN'UAKY 1979




                                       SECTION  9 (CONTINUED)




              PERFORMANCE DESCRIPTION FOR OPERATIONAL ?GD SYSTEMS ON INDUSTRIAL BOILEHS




 CATERPILLAR TRACTOR CO.? EAST PEORIA, ILLINOIS (CONTINUED)






 fO THE COAL SHORTA6E.






 END 9IIARTER-1978    DURING THIS REPORT PERIOD START-UP OCCURRED.  BECAUSE THE flOILCR PLANT WAS NEAR




 THE. END OF THE HEATING SEASON, THE BOILER LOADS WERE IN THE 70,000-100,000 L8/HR STEAM RANGE.




 DURING COLO WEATHER OPERATIONS, THE BOILER LOADS ABE APPROXIMATELY 800,000 LB/HR.  THE SYSTEM MS




 BUILDING GOOD FILTER CAKE DURING THE START-UP PHASE OF OPERATIONS.  FINAL STEADY STATE OPERATIONS




 NERE NOT ACHIEVED BEFORE SUMMER SHUTDOWN.









 fRD OUARTER-1978    THE FGD SYSTEM HAD JUST STARTED UP AGAIN AFTER SUMMER SHUTDOWN.




 NO MAJOR START-UP PROBLEMS NERE REPORTED.









 4TH OUAHTER-1978    PLANT PERSONNEL REPORT THAT AN ABNORMALLY HIGH PRESSURE DROP THROUGH THE




^SCRUBBERS IS RESTRICTING THE BOILERS TO ABOUT BOX OF THEIR CAPACITY.  FAN ANO DRAFT TESTS MERE




|bEIN6 RUN IN DECEMBER TO PINPOINT THE PROBLEM AREA.  THE FAN AND DRAFT TESTS FURTHER DELAYED




^SCHEDULED EMISSION TESTING.  SINCE START-UP IN SEPTEMBER SCRUBBER OPERATIONS HAVE NOT BEEN SUFFICI-




 ENTLY CONSISTENT TO COMPLETE ANY EMISSION TESTS.




     A TEN-INCH PLASTIC RECIRCULATION LINE BROKE ON ONE SCRUBBER AND HAD TO BE REPLACED.

-------
                                                                             STATUS 10 JANUARY I«>79
             PERFORMANCE  OHSc«iPTn>!i FOK MHFWAI IDNAL  FGD SYSTEMS on iNousiimi  HHILEHS
 INSTALLATION  NAME
 INSTALLATION  LOCATION
 SOURCE  CHARACTFRISTTCS
 SOURCE  RATING
 NUMBER  OF  SEPARATE  FGD UNITS
 NUMBER  <1F  BOILFRS  BFING CONTROLLED
 SOURCE  CAPACITY


 CONTROL SYSTEM VENDOR
 CONTROL PROCESS
 NEW  / RFTROFIT
 START-UP OATE
 CONTROL SYSTEM STATUS
 803  REHOVAL EFFICIENCY
 PARTICUIATE REMOVAL EFFICIENCY
 MATER MAKF-IIP
 SLUDGE  OR BY-PRODUCT DISPOSAL
 CONTROL SYSTEM COST
CATFRPILLAK TKACTOH CO.
JDLIET, ILLINOIS
COAL (3.it SULFUR)
67,000 SCFM (TOTAL - 2 BOILERS)
 a
 e
30 M*  (EOUIVAIENT); TOTAL - Z BOILERS
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 3000 SCFM = 1 EQUIVALENT  MW.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
ZURN INDUSTRIES
DOUBLE ALKALI (DILUTE)
RETROFIT
SEPTEMBER, 1970
OPERATIONAL
90+x (aooo PPM a  INLET)
NOT AVAILABLE
CLOStO LOOP: 0.5  GPM
DEHATF.RED SLURRY  TO LANDFILL
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
    THE JOLTFT PLANT OPERATES TWO COAL-FIRED BOILERS RATED AT 100,000 AND so.ooo POUNDS OF STEAM
PER HOUR.  TMFSE BOTLFRS ARE ON-LTNE ONLY DURING WINTER MONTHS, ONE OF WHICH OPERATES 20 HR/OAY
AND THE OTHER ONLY WHEN A GREATER STEAM RATE IS REQUIRED DUE TO COLD WEATHER.  THE COAL HAS A
HEATING VALUF OF 10,500 BTU/LB AND IS FIRED AT A RATE OF v.65 TONS/HR.  TOTAL 302 EMISSIONS FROM
THE BOLER IS 6.7« LHS/MM 8TU.
    THE FGD SYSTEM ON EACH BOILER IS A 7URN DOUBLE ALKALI SCRUBBER CONSTRUCTED OF 316L STAIN-
LESS STFEL.  FACH SCBOHReR EXHAUSTS THROUGH A CARBON STEEL STACK.  THE TOTAL FLUE GAS FLOW RATE
IS 103,500 ACFM a> 350 F.  THE SCRUBBER UNI1S APE PRECEDED BY MECHANICAL COLLECTORS FOR PARTICULATE
REMOVAL.  THF 7HRN SCRUHBER UTILIZES A DUSTRAX10R MODULE FOR BOTH PARTICULATE AND 803 CONTROL.
    SPENT SCRUBBING LIUUOR  IS PUMPED TO THE REGENERATION »HEA WHERE LIME  IS ADDED TO PRODUCE CALCIUM
SULFITE./SHLFATE IN CLARIFIERS.   CLARIFIFR UNDERFLOW, WHICH IS 15-aOX SOLIDS BY WEIGHT, IS
DEMATEREO BY VACUUM FILTERS 10 APPROXIMATELY 651 SOLIDS BY WEIGHT.  THE TH1XOTROPIC SLUDGE
PRODUCED IS READY FOR DISPOSAL AT A LANDFILL.  CLARIFIER OVERFLOW IS RETURNED TO THE SCRUBBER  AS
REGENERATED SCRUBBING LIUUOR.  SODA ASH  IS  ALSO  ADOEO  TO THE REGENERATED  LIQUOR TO REPLENISH
SODIUM LOST IN  THE SLUDGE.  LIME AND SODA ASH  ARE STORED IN OUTSIDE SILOS AND PNEUMATICALLY CONVEYED
TO USE POINTS.  A CHEMICAL  TREATMENT BUILDING  (.AS ERECTFD  TO HOUSE REGENERATION AND SLUDGE HANDLING
EQUIPMENT.

-------
                                                                             STATUS  IP JANUAkY 11»79
                                      SFCTION  O  fCf)NTINUPD)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL FRD SYSTEMS ON  INDUSTRIAL BOILERS
CATERPILLAR TRACTOR CO.? JOLIET, ILLINOIS  (CONTINUED)

    REFER TO FIGURE 11-23 OF SECTION 1/1 FOR A DETAILED PROCESS FLOW  DIAGRAM OF THIS  SYSTEM.

                                         OPERATING HISTORY
3RD OUARTER-1977    PROBLEMS OCCURRED NHEN A TANK RAN DRY AND DAMAGED A PUMP.  SOME  PIPE PLUGGING
PROBLEMS ALSO OCCURRED AS A RESULT OF THE  PUMP FAILURE.  A MAJOR PROBLEM AREA WAS THE HEAVY
HEAR OF THE FILTER CLOTHS ON THE VACUUM FILTERS.  THE FILTER CLOTH LASTS ONLY 2 TO 3 WFEKS.
NO SOLUTIONS HAD BEEN FOUND BUT FILTER DESIGN MODIFICATIONS WERE BEING CONSIDERED.
THE UNITS NERE ULTRASONICALLY TESTED AND RESULTS  SHOW THAT THE SYSTEMS ARE ON THE HIGH
SIDE OF TOLERANCE LEVELS.  A MINOR LEAK WAS DETECTED AS A RESULT OF  A FAULTY MELD.

4TH QUARTER-1977     FGD SYSTEM RESTART OCCURRED  AT THE BEGINNING OF THE HEATING SEASON.
PLANT HAD INITIATED A PROCESS OF DETAILED  RECORD  KEEPING BUT MAS STILL WORKING
ON THE INTERNAL INFORMATION TRANSFER PROCESS.  PLANT HAS INDICATED THAT A SUMMARY OF THESE
RECORDS WILL BE AVAILABLE TO THIS REPORT IN THE FUTURE.

1ST QUARTER-1978   FILTER CLOTH PROBLEMS CONTINUED WITH REPLACEMENT  BEING REQUIRED EVERY 2-3 WEEKS.
THE SYSTEMS WERE DOWN IN MARCH BECAUSE OF  PLUGGED PIPELINES.

2ND OUARTER-1978   UNRELIABLE 802 MONITORS HERE A PROBLEM DURING THIS PERIOD.  HEAVY ATTRITION OF
FILTER CLOTHS CONTINUED.

3RD OUARTER-1978    DUE TO SHORT FILTER FABRIC LIFE AND SLUDGE FREEZE UP PROBLEMS, FILTER DESIGN
MODIFICATIONS MERE STILL BEING CONSIDERED, BUT HAD NOT YET BEEN MADE.
     302 MONITORS ARE STILL A PROBLEM EXHIBITING  PLUGGING, CORROSION, AND UNRELIABLE PERFORMANCE.
PROBES OF 304 SS, 316L S3 AND TEFLON COATING HAVE ALL BEEN TRIED WITHOUT SUCCESS.  HASTELLOY-C
PROBES HAVE BEEN INSTALLED, BUT THE PLANT  HAS NOT HAD TIME TO EVALUATE THEIR PERFORMANCE.  REHEAT
EQUIPMENT WAS SCHEDULED TO BE INSTALLED BUT HAS NOT BEEN AS OF THIS  UP-DATE.  GUILLOTINE-TYPE
DAMPERS REPLACED THE LOUVER-TYPE ISOLATION DAMPERS ORIGINALLY INSTALLED.  HOWEVER, THE GUILLOTINE-
TYPE CANNOT BE CLOSED TIGHTLY BECAUSE FLY  ASH COLLECTS IN THE BOTTOM OF THE GUILLOTINE SHEATH.
                                                                                               t
1TH OUARTER-1978    THE BOILERS STARTED OPERATIONS IN THE LAST MEEK OF OCTOBER.  FILTER CLOTH HEAR
CONTINUES TO BE A PROBLEM.  THE HASTELLOY-C 802 PROBES REQUIRE EXCESSIVE MAINTENANCE FOR PROPER
FUNCTIONING.  CORROSION AND EROSION OF THE PROBES IS NOT YET EVIDENT.  FLYASH ACCUMULATION IN THE
BOTTOM OF THE GUILLOTINE DAMPERS IS STILL A PROBLEM.           I
     ALTHOUGH PIPE PLUGGING IS NOT NORMALLY A PROBLEM (THE ENTIRE SYSTEM IS FLUSHED AND CLEANED
DURING THE SUMMER OFF SEASON), SLIGHT BUILDUPS IN THE PIPING HAVE OCCURRED.

-------
                                                                             STATUS  TO  JANUARY  1979

                                      SECTION  9 (CONTINUED)

             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON  INDUSTRIAL BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING

  NUMBER OF SEPARATE FGD UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEN / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  302 REMOVAL EFFICIENCY

  SLUDGE OR BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
CATERPILLAR TRACTOR CO.

MORTON, ILLINOIS

COAL (3.2Z SULFUR)

3S.OOO SCFM (TOTAL - 2 HOtLERS)

 2

 2

19 Hh (EQUIVALENT); TOTAL 2 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE. 200U SCFM =  1 FOUIVALfNT Mw.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  MODULE  SIZING.)

ZURN INDUSTRIES

DOUBLE ALKALI (DILUTE)

RETROFIT

JANUARY, 1976

OPERATIONAL

90Z (2000 PPM 3 INLET)

OEWATERED SLURRY TO LANDFILL

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

   AT THE MORTON PLANT, A PARTS DISTRIBUTION CENTER, CATERPILLAR TRACTOR OPEKATFS  A  TWO-BOILER  STEAM

PLANT WHICH GENERATES A TOTAL OF 66,000 ACFM AT «50 F  AT MAXIMUM LOAD.  THE STOKER COAL-FIRED

BOILERS ARE MANUFACTURED BY KICKS AND ARE RATED FOR 60,000 LB/HR SIEAM  EACH AT  150 PSIG.   AN OIL-

FIRED BOILER RATED AT 120,000 LB/HR STEAM IS AVAILABLE  AS BACK-UP.   HEAT INPUT  IS  70.7  MM  8TU/HH.

THE HEATING VALUE OF THE COAL IS 10,400 BTU/LB.

     EMISSIONS ARE CONTROLLED BY A ZURN INDUSTRIES AIR  OUALITY CONTROL  SYSTFM CONSISTING OF A 1)118-

TRAXTOR SCRUBBER IN WHICH PART1CULATE AND S02  REMOVAL  OCCUR  SIMULTANEOUSLY.  SULFUR  DIOXIDE REMOVAL

IS BROUGHT ABOUT BY THE USE OF ZURN DILUTE  MODf DOUBLE  ALKALI FGO TECHNOLOGY.   THE ThO  BOILERS  AND

THE TWO SCRUBBING TRAINS AND MOST ANCILLARY EQUIPMENT  ARE WITHIN THE  BOILFR HOUSE.

   THE SYSTEM AT MORTON IS VERY SIMILAR TO  THAT AT THE  CATERPILLAR  JOLIET  PI ANT, WHICH  HAS BEFN

OPERATING EACH HEATING SEASON SINCE OCTOBER 197q.  WHENEVER  POSSIBLE, PROBLEM AREAS  AND

SOLUTIONS IDENTIFIED IN JOLIET OPERATIONS HAVE HEFN IMPLEMENTED TO  IMPROVE THE  SYSTEM DESIGN

AT MORTON.  SPECIFIC AREAS IN WHICH MODIFICATIONS TO DESIGN  HAVE BEEN MADF AWE  HATEH BAI ANCE

PUMPS, PM MONITORING, PIPING, LIME STORAGE, AND COLO WEATHER PROTECTION.

     REFER TO FIGURE 14-9  IN SECTION  14 FOR A  DETAILED  PROCESS FLOW DIAGRAM UF  THIS  SYSTEM.



                                          OPERATING HISTORY

1ST OUARTFH-197B    SYSTEM START-UP OCCURRED  AT THF BEGINNINU OF JANUARY.   INITIAL OPERATIONS »ERF

PROBLEM-FBEF.  THROUGH JANIIAHf  AND PART  f.F  FEBRUARY, ZURN PEHSUNNEL Wf«F TRAILING  THE KfiUfR PL»NT


                                                46

-------
                                                                              STATUS TO JANUARY !<»? THE CAUSE OF WHICH nAS NOT KNOWN.









 3RD OUAHTER-I978   ACCEPTANCE TESTING WAS DELAYED DUE TO THE PUFFING PROBLEM.  THE TESTING




 •ILL BE  ATTEMPTED LATE THIS FALL.  EVEN THOUGH PUFFING REMAINS A PROBLEM, PLANT PERSONNEL FEEL THEY




 ABE CLOSER TO RESOLVING IT DUE TO NEH DESIGN MODIFICATIONS TO THE SCRUBBER.






 «TH QUARTER-1978     DURIN6 THIS QUARTER, THE PUFFING PROBLEM HAS CORRECTED.  THE PUFFING PROBLEM




 HAS A RESULT OF SEVERE PRESSURE PULSATIONS INSIDE THE ABSORBER DURING OPERATIONS.  INSTANTANEOUS




 PRESSURE DROPS OF 10 INCHES W.G. ACROSS THE SCRUBBER OCCURRED SEVERAL TIMES.  ZURN INDUSTRIES PER-




 SONNEL TRIED TO SOLVE THE PROBLEM BY INSTALLING TURNING ELBOWS IN THE STACK, HUT THIS FAILED TO




 SOLVE THE PROBLEM.  FINALLY PLANT PERSONNEL INSTALLED WINDOWS IN THE ABSORBER AND THROUGH THE USE




 OF  SPOTLIGHTS OBSERVED THE ACTION OF BLOWING COLO AIR THROUGH THE ABSORBER.  IT WAS NOTICED THAT A




 HAVE BEGAN TO PROPAGATE BACK AND FORTH ACROSS THE ABSORBER CAUSING THE WATER LEVEL AT THE BOTTOM




 OF  THE DOHNCOMER CHANNELS TO DROP BELOW THE BOTTOM OF THE CHANNELS.  GAS WAS THEN ALLOWED TO PASS




 UP  THE DOWNCOMER CHANNELS (ONE ON EACH SIDE OF THE ABSORBER) INSTEAD OF THE NORMAL SCRUBBING TUBES




 AND PREVENTED THE SCRUBBING LIQUOR TO RETURN TO THE BOTTOM POOL.  AS A RESULT, PULSATIONS OCCURRFO




 ALONG THE DOWNCOMER.  THE PROBLEM MAS SOLVED BY SEALING THE OOWNCOMER WITH WELDED PLATES EXCEPT FOM




 THREE TUBES.  THESE TUBES WERE LONGER THAN THE ORIGINAL DOWNCOMER CHANNEL TO ENSURE THE TU8E BOTTOMS




 REMAINED CONTINUOUSLY SUBMERGED.




      SINCE THE PH PROBES CONTINUOUSLY BECAME PLUGGED AND GAVE FALSE READINGS, PH IS MEASURED HOURLY




 WITH A MULTI-BAND LITMUS PAPER.




      AN  INITIAL WATER BALANCE PROBLEM WAS CAUSED BY TOO MUCH WATER ENTERING THE FGO SYSTEC AS PUMP




 SEAL MATER.  IT WAS CORRECTED BY  INSTALLING ROTAMETFRS ON SEAL WATER LINES TO REGUL*TF FLO*.




      ACCEPTANCE TESTING HAS BEEN  COMPLETED AND AN APPLICATION HAS BEEN SUBMITTED TO THE STATE FOR




 A STATE  PERMIT TO OPERATE.  THE PLANT BELIEVES THEY WILL RECEIVE THE FIRST SUCH PERMIT IN ILLINOIS




 TO  BURN  HIGH SULFUR COAL IN AN INDUSTRIAL BOILER.

-------
                                                                             STATUS TIJ  JANIJAKY 1979


                                      SFCTJON   0  (CONTINUED)

            PE»FORMA*CF DESCRIPTION  FOK  OPERATIONAL  Ff,r>  SYSTEMS  ON  INDUSTRIAL  BOILERS
 INSTALLATION NAME

 INSTALLATION LOCATION

 SOURCE CHARACTERISTICS

 SOURCE RATING

 NUMBER OF  SEPARATE  FGO  UNITS

 NUMBER OF  BOILERS BEING CONTROLLED

 SOURCF CAPACITY





 CONTROL  SYSTEM VENDOR

 CONTROL  PRClCtSS

 NEW  / RETROFIT

 START-UP DATE

 CONTROL  SYSTEM  STATUS

 SOa  REMOVAL EFFICIENCY

 SLUDGE  OR BY-PRODUCT DISPOSAL




 CONTROL  SYSTEM  COST
CATFfcPILLAH TRACTON CO.

MOSSVILLE, ILLINOIS

COAL (3.?X SULFUR)

130,000 SCFM (TOTAL - 1 BOILERS)

 0

 a

70 MW  (EQUIVALENT); TOTAL - 9 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE. 3000 SCFM  =  1  EQUIVALENT^
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  MODULE  SIZINi

FMC ENVIRONMENTAL EQUIPMENT

DOUBLE ALKALI  (CONCENTRATED)

p NE*  3 RETRO

OCTOBER,  1975

OPERATIONAL

90+X (2000 PPM 3  INLET)

DENATERED SLURRY  TO LANDFILL

60+X SOLIDS  (CAS01) SLUDGE DIRECTLY TO LANDFILL

SEE SECTION  13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

     AT THF MOSSVILLE PLANT, CATERPILLAR TRACTOR OPERATES A FOUR-BOTLER STEAM PLANT.  TWO OF THE

BOILERS ARE RATED AT 150,000 LBS/HR STEAM AND THO ARE RATED AT 80,000 LBS/HR STEAM.  THE ENTIRE

q-UNIT PLANT TS ROUGHLY EQUIVALENT TO 70 MM OF ELECTRICAL GENERATING POWER.  THE COAL FIRED IS

HIGH-SULFUR (3.ZX-1.0X) ILLINOIS COAL.  THE FOURTH BOILER, AT 150.000 LBS/HR, BEGAN OPERATIONS

IN 4UNE 1977 AND ITS FGD SYSTEM WAS BYPASSED UNTIL OCTOBER 1977.  THE TWO MOST RECENTLY INSTALLED

BOILERS HAVF MFCHANICAL COLLECTORS PRECEEOING THE SCRUBBERS.

     FMC ENVIRONMENTAL EQUIPMENT DIVISION HAS SUPPLIED AN AIR QUALITY CONTROL SYSTEM CONSISTING OF  A

VENTURI SCRUBBER FOR PARTICIPATE CONTROL AND AN ABSORBER MODULE FOR 802 CONTROL.  FMC CONCENTRATED

MODE, OOUBLF ALKALI FGD TECHNOLOGY IS BEING USED IN  THE ABSORBER MODULES.   THE TWO  150,000

LB/HR BOILERS HAVE MECHANICAL COLLECTORS REMOVING ABOUT 90X OF THE INLET FLYASH.  THE SCRUBBING

TRAINS ON  THE TWO SMALLER  BOILERS HAVE NO PRECEDING  MECHANICAL COLLECTORS.   THE POSITION OF THE

VENTURI CAN 8F CONTROLLED  AUTOMATICALLY BY STEAM FLOW, BUT CURRENTLY  IS NOT IN OPERATION.

     WHILE THE FLYASH  IN THE FINAL FILTER CAKE PROVIDES ADDED MECHANICAL STABILITY, THE HIGH  ASH

CONTENT IN THE RECIRCULATING SLURRY CAUSED SEVERE EROSION/ABRASION PROBLEMS IN EARL* OPERATIONS.

THE  ORIGINALLY INSTALLED ȣIR-TYPE CONTROL VALVES HAVF BEEN REPLACED  HITH  SPOOL PIECES AND  A

CONSTANT VOLUME  PUMPING  SYSTEM.   THERE WAS ALSO SIGNIFICANT WEAR  IN THE VENTURI SCRUBBER BOTTOMS,

WHICH  HAS  SOLVED BY  THF.  INSTALLATION  OF WEAR  PLATES.


      SEVERAL PROBLEM AREAS WERE  IDENTIFIED AND DEALT WITH  DURING  THE  TWO HEATING  SEASONS PRIOR  TO.
                                                 as

-------
                                                                             STATUS TO JANUARY



                                      SECTION  9  (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPFKATTONAl FGD SYSTEMS ON  TNOHSTRTAt BOTLERS



CATERPILLAR TRACTOR CO.? MOSSVILLE, ILLINOIS  (CONTINUED)





THE 1977-78 SEASON.  THESE ARE LISTED BELOW.



     PUMPS - THE RUBBER-LINED SLURRY PUMPS WERE OVERSIZED WHICH CAUSED HIGH PIPE VELOCITIES AND



ACCELERATED WEAR ON THE PUMP LININGS.  THESE  PUMPS WERE REVISED TO LOWER THEIR OUTPUT.  LOW SEAL



WATER PRESSURE ALLOWED PROCESS LIQUOR TO GET  INTO THE PUMP AND PACKING.  ALL SEAL WATER



IS NOW ONCE-THROUGH AND SYSTEM PRESSURES HAVE BEEN ADJUSTED TO MAINTAIN SEAL WATER PRESSURE



ABOVE PROCESS LIQUID PRESSURES.



     SLUDGE HANDLING - SLUDGE IS TRANSPORTED  FROM THE VACUUM FILTERS TO THE LOADING AREA ON A BELT



CONVEYOR.  SEVERAL STRATEGIES. ALL  INVOLVING  SCRAPING OR PLOWING THE DEWATERED SLUDGE OFF THE BELT,



RESULTED IN EXCESSIVE WEAR OF EITHER THE BELTS OR THE PLOWS.  THE PRESENT APPROACH SIMPLY DUMPS



THE MATERIAL OFF THF FND OF THE BELT INTO BINS.   THE POSITION OF THE BELT IS CHANGEABLE SO THAT



EIGHT BINS CAN BE FILLED BEFORE THEY MUST BE  EMPTIED. A FURTHER MODIFICATION HAS A DUAL POSITION



CHUTE UNDER EACH BELT END POSITION, SO THAT A TOTAL OF 16 BINS CAN BE WORKED AT A TIME.



SLUDGE BINS ARE THEN LOADED HYDRAULICALLY INTO TRUCKS AND HAULED TO  THE SANITARY LANDFILL AREA.



ANOTHER PROBLEM, COLD WEATHER ICING ON THE SLUDGE LOADING AREA, HAS  SOLVED BY ENCLOSING THE AREA.



     INSTRUMENTATION - ORIGINAL DESIGN PLANS  CALLED FOR CONTROL BY THE MONITORING OF THE sos/soa



RATIO AND SODIUM ION CONCENTRATION.  THE CONTROL  RANGE MAS FOUND TO  BE TOO SMALL AND THE PRESENT



APPROACH IS PH CONTROL (6.5) AND CLEANING OF  THE  PROBES EVERY OTHER  OAT.



     ORIGINAL DESIGN DID NOT MONITOR 302 CONCENTRATION BUT A COMPLETE MONITOR SYSTEM WAS INSTALLED



PRIOR TO THE 1977-78 SEASON.



     PIPING - MODIFICATIONS HAVE BEEN MADE WHICH  FACILITATE CLEANING OR SCHEDULED REPLACEMENT.



    REFER TO FIGURE lfl-10 IN SECTION Ifl FOR A DETAILED PROCESS FLOW  DIAGRAM OF THIS SYSTEM.







                                         OPERATING HISTORY



«TH QIJARTER-1977    CATERPILLAR BEGAN A PROCEDURE OF DETAILED RECORD KEEPING, BUT THE INFORMATION



HAS NOT YET AVAILABLE TO THIS REPORT.





2ND QUARTFR-1978    NUMEROUS BOILER-RELATED PROBLEMS HAVE COMPOUNDED FGD SYSTEM PROBLEMS.  MAJOR



FGD PROBLEM AREAS WERE AS FOLLOWS:



    EROSION OF SCRUBHEK LINER MATERIAL.



    EXCESSIVE WEAR OF PIPING, PUMPS, AND CONTROL VALVES.



    SLUOGF FRFEZE-UP ON THE CONVEYOR BELT PLUGGED SLUDGE CHUTES.







3RD OUARTER-1978    PERFORMANCE OF THE VENTURI SPRAY NOZZLES HAS NOT BEEN SATISFACTORY.  NQZZELS OF



316L S3 WFRF. ORIGINALLY INSTALLED AND LASTED ABOUT FOUR MONTHS.  CERAMIC NOZZLES WERE THEN TRIED BUT



BROKE WHEN BEING REMOVED.  THE PLANT RETURNED TO USING 316L SS SINCE THE STEEL NOZZLES WERE  CHEAPER



THAN THE CERAMIC NOZZLES.  PLANS ARF BEING MADE TO MODIFY THE NOZZLE CONFIGURATION.   THE VENTURI



IS BETN6 OPERATED MANUALLY SINCE PLANT PERSONNfL HAVE NOT HAD TIME TO DEBUG THE AUTOMATIC CONTROL.







                                                49

-------
                                                                             STATUS TO JANUARY  1979




                                      SECTION  9 (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BflTLtKS




CATERPILLAR TRACTOR CO.; MOSSVILLE, ILLINOIS  (CONTINUED)






    END-DISCHARGING DISH CONVEYORS FOR THE SLUDGE CONVEYOR SYSTEM HAVE NOT YCT BEEN INSTALLED




BECAUSE THE ENTIRE SLUDGE HANDLING FACILITY IS CURRENTLY BEING REEVALUATED. THIS REEVALUATJCIN  IS




A RESULT OF THE MANY PROBLEMS CATERPILLAR HAS HAD WITH THEIR SLUDGE HANDLING SYSTEM.




    MODIFICATIONS TO PIPING IN ORDER TO FACILITATE PIPE CLEANING AND SCHEDULED REPLACEMENTS HAVE  MOT




BEEN SIGNIFICANT.  THE GUILLOTINE DAMPERS AT THIS PLANT ARE EXPERIENCING THF SAME PROBLEMS AS  THE




DAMPERS AT THE JOLIET PLANT* FLYASH COLLECTING IN THE BOTTOM OF THE DAMPER PREVENTS THE HAMPER  FKOV




BEING CLOSED TIGHTLY.  WEAR PLATES HERE INSTALLED IN THE BOTTOM OF THE VENTURI SCRUBBERS TO PREVENT




ABRASIVE WEAR AND ARE MORKING HELL.  PLANT PERSONNEL FEEL THEY ARE STILL IN A DEBUGGING PHASE.








«TH OUARTER-1978    PLANT PERSONNEL DESCRIBED THE FGD SYSTEM OPERATION AS SPORADIC AND FLUCTUATING.




PROBLEMS ARE ENCOUNTERED, CONTINUOUSLY CAUSING SYSTEM SHUTDOWN.  EROSION CONTINUES TO BE A SIG-




NIFICANT PROBLEM.  VALVES, FITTINGS, LININGS, PUMPS, FANS, AND SCRUBBER NOZZLES ARE ALL ERODING.




THE WEAR PLATE INSTALLED IN THE BOTTOM OF THE SCRUBBER HAS SLOWED THE EROSION THERE.




    THE VENTURI NOZZLE CONFIGURATION WAS NOT CHANGED AND THE VENTURI IS STILL OPERATED MANUALLY.




    THE SLUDGE HANDLING FACILITIES HAVE NOT BEEN REEVALUATED OR CHANGED YET.  FILTER FABRIC WEAK  AND



SLUDGE FREEZE-UP CONTINUE TO BE A PROBLEM.




    A MAINTENANCE PROGRAM TO CLEAN THE GUILLOTINE DAMPER OF FLYASH HAS NOT VET BEEN DEVELOPED.




    AN EMISSIONS TEST IS SCHEDULED FOR LATE JANUARY OH EARLY FEBRUARY 1979.

-------
                                                                              STATUS TO JANUARY  1979
                                       SECTION   9  (CONTINUED)
           - PERFORMANCE DESCRIPTION FOR  OPERATIONAL  Fcr>  SYSTEMS  ON  INDUSTRIAL  BOILERS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING

  NUMBER OF SEPARATE FED UNITS
  NUMBER OF BOILERS BEING CONTROLLED
  SOURCE CAPACITY
  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  802 REMOVAL EFFICIENCY
  WATER MAKE-OP
  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
CHEVRON U.S.A. INC.
BAKERSFIEID, CALIFORNIA
OIL (1.1* SULFUR)
248,000 SCFM (TOTAL - IB BOILERS)
150,000 ACFM 3 500F, FOR EACH OF 3 FGD SYSTEMS.
 3
18
125 MW (EQUIVALENT): TOTAL - 18 BOILERS
900 MM BTU/HR (TOTAL - 18 BOILERS: 6 BOILERS/FGO SYSTEM)
(FOR THIS REPORT, UNLESS STATED OTHEHKISE. 2000 SCFM = 1 EQUIVALENT M*.
THIS IS BECAUSE GAS FLO* RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
KOCH ENGINEERING
SODIUM CARBONATE SCRUBBING
RETROFIT
JULY, 1978
OPERATIONAL
90Z (70 PPM 9 OUTLET)
ia - 13 GPM
MASTENATER TREATMENT AND DISCHARGE TO TAILINGS POND
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION
     CHEVRON U.S.A. HAS AN OIL SITE AT BAKERSFIELD,  CALIFORNIA.   THERE  ARE  ABOUT  SO  STEAM  GENERATORS
MHfCM BURN 1.1* SULFUR CRUDE OIL.  EACH GENERATOR  IS RATED  AT  50  MM  BTU/HR.   THE  STEAM  IS  USED  FOR
(ENHANCED OIL RECOVERY FROM THE OIL NELLS.
     KOCH ENGINEERING COMMISSIONED THREE FGD  SYSTEMS IN  JUNE/JULY  1978.   THE  SODIUM  CARBONATE
SCRUBBING PROCESS IS USED.  EACH SCRUBBER TREATS FLUE GASES FROM  6 GENERATORS «ITH A TOTAL
FLOW RATE OF 150,000 ACFM AT 500 F.  THE GAS  IS QUENCHED  IN THE BOTTOM  PORTION OF THE ABSORBER  BY
120 6PM OF THE RECIRCULATIN6 LIQUOR.  THERE ARE 3  KOCH FLEXITRAYS  AND A KOCH  FLEXIMESH  MIST
ELIMINATOR IN EACH SCRUBBER.  THE SPENT LIQUOR IS  MIXED WITH FRESH SODIUM CARBONATE  SOLUTION IN THE
BOTTOM OF THE SCRUBBER.  A CONTINUOUS BLEED-OFF STREAM (1-2 GPM)  IS  TAKEN TO  A DISPOSAL POND,
HMEREAS THE REST OF THE LIQUOR IS RECIHCULATEO AT  A TOTAL RATE OF  900 GPM (15 wTX DISSOLVED SOLIDS).
A PH OF 6.5 IS MAINTAINED AT THE TOP TRAY AND AN L/G RATIO  OF  8 GAL/1000  ACF  IS USED.   THERE IS
«0 REHEAT FACILITY BUT THE SCRUBBER CAN BE BYPASSED.  THE BOILER  t.O. FANS WERE UPGRADED
FROM 50 HP TO 75 HP TO OFFSET THE PRESSURE DROP OF 9 IN. KG. ACROSS  THE ABSORBER.  THF.  SCRUBBERS AWE
DESIGNED TO REMOVE L ss AND  THF

-------
                                                                              STATUS  TO JANUARY 1979
                                      SECTION   9  (CONTINUED)
                       E DESCRIPTION FliR  OPFRA1IONAI  FGP  SYSTEMS  ON  INDUSTRIAL  BOILERS
CHEVRON U.S.A. INC.; rIAKERSF IELD, CALIFORNIA  (CONTINUED)

FLEXIMESH is iwcninr rt*s.  THE STACK is M*OF. OF 316  ss  AND  THE  PIPING  is  FOP.
           T(» FTGMRF lfl-l? IN SECTION 1«  FOR A  DETAILED PROCESS FLOW DIAGRAM  OF THIS SYSTEM.
                                       OPERATING   HISTORY
3RD QIIARTFH-197«    BECAUSE OF LOW STEAM DEMAND ONLY  T«0 OF  THE  EXISTING  THREE  SCRUBBERS  ARE  OPERA-
TIONAL (OUT OF THF 1» STEAM GENERATORS 13 ARE OPERATIONAL).  ONE SCRUBBER CONTROLS  7  GENER-
ATORS WHILE THE OTHER CONTROLS 5 GENERATORS.  THE  RFMAINING  6 STEAM  GENERATORS  AND  THE  CORRESPOND-
ING SCRUBBER HILL BF BROUGHT ON-LTNE AS STEAM DEMAND  INCREASES  (POSSIBLY  IN DECEMBER  OR JANUARY).
     NO MAJOR PROBLEMS HAVE OCCURRED SINCE START-UP IN JUNE-JULY 1978.  HOWEVER,  SOME CLOGGING  OF
THE SOOA ASM FEFO CHUTE FROM THE STORAGE SJLO DOES OCCUR.  THIS  CLOGGING  IS EASILY  CORRECTED  WITH  NO
DOWNTIME NECESSARY.  SYSTEM OPERABILITY FOR THE PERIOD HAS 95X.
     GOOD OPERATION IS ATTRIBUTED TO REGULAR MAINTENANCE PRACTICE WITH  EMPHASIS ON  DAILY  CLEANING  OF
THE PH PRfWFS.

flTH OUARTFH-197B   SYSTEM AVAILABILITY OF 1 OOJC WAS REPORTED  FOR  THIS PERIOD.  THERE WERE  NO
SCALING OR PLUGGING PROBLEMS.  ROTATING EQUIPMENT  (FANS. PUMPS)  MAVF OPERATED WITHOUT TROUBLE.   THE
MIST ELIMINATOR HASH FREQUENCY IS TWICE A DAY, ABOUT  iO MINUTES  AT A  TIKE, APPROXIMATELY  50 GPM
FLOW OF FRESH WATER.

-------
                                                                             STATUS  TO JANUARY  1979

                                       SECTION   9  (CONTINUED)

             PERFORMANCE DESCRIPTION FOB OPERATIONAL FGD SYSTEMS ON  INDUSTRIAL BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING

  NUMBER OF SEPARATE FGO UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  803 REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  SLUDGE OR BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
FIRESTONE TIRE AND RUBBER CO.

POTTSTOWN, PENNSYLVANIA

COAL (2.5 - 3,0t SULFUR)

6070 SCFM (13,000 ACFM 3 300 F)

 1

 1

fl MW (EQUIVALENT)

(FOR THIS REPORT, UNLESS STATED OTHERWISE. 2000 SCFM = 1 EQUIVALENT MW
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

FMC ENVIRONMENTAL EQUIPMENT

DOUBLE ALKALI (CONCENTRATED)

RETROFIT

JANUARY, 1975

OPERATIONAL

90.5X (1000 PPM 3 INLET)

97.ax (5 LB/MM BTU 3 INLET TO MECHANICAL COLLECTOR.)

DEWATEREO SLURRY TO LANDFILL

SEE SECTION 13 FOB DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION

    THE FIRESTONE TIRE AND RUBBER CO. LOCATED  IN POTTSTOHN,  PENNSYLVANIA  HAS BEEN OPERATING AN FGD

SYSTEM SINCE JANUARY 1975 AS A DEMONSTRATION-SIZE  PLANT, DESIGNED  TO  TEST THE FEASIBILITY OF FGP

ON INDUSTRIAL BOILERS.  THE UNIT IS DEMONSTRATING  90  PERCENT 802 REMOVAL  EFFICIENCY AND TREATS

A FLUE GAS CAPACITY OF 13,000 ACFM OR 3 MW  (EQUIVALENT).  THIS FLOW REPRESENTS APPROXIMATELY

1/3 OF THE TOTAL OUTPUT OF ONE 120,000 LB/HR STEAM BOILER.   THE SULFUR DIOXIDE EMISSION REGULATION

FOR THE PLANT IS 0.86 LOS/MILLION BTU OF HEAT  INPUT.

    THE PLANT IS USING THE CONCENTRATED DOUBLE ALKALI PROCESS PATENTED BY  FMC CORPORATION.  THE LOAD

CAPACITY OF THE BOILER ON WHICH THE SCRUBBER IS OPERATING IS APPROXIMATELY 15 MW.  IN OCTOBER 1976,

THE BOILER MAS CONVERTED FROM BURNING RESIDUAL FUEL OIL (2.8* S) TO COAL  (2.5-3.OS S).

    THE VENTURI SCRUBBER IS SPRAYED WITH ALKALINE  LIQUOR WHERE THE FLUE GAS ENTERS.  THE FAN AND

DAMPER UPSTREAM OF THE VENTURI CONTROL THE FLUE 6AS FEED.  SCRUBBING LIQUOR FLOWS FROM THE VENTURI

TO THE BOTTOM OF THE CYCLONE DEMISTER AND THEN INTO THE RECIRCULATION TANK.  DROPLETS OF SCRUBBING

LIQUOR ARE SPUN OUT IN THE CYCLONE AND RUN BACK DOWN  INTO THE RECIRCULATION TANK.  THE SCRUBBING

LIQUOR IS PARTLY RECIRCULATED TO THE VENTURI THUS  COMPLETING THE SCRUBBING CYCLE.  ACCUMULATION OF

SOLUBLE SODIUM BISULFITE IS PREVENTED BY CONTINUOUSLY DRAWING OFF A SMALL STREAM OF SCRUBBER SOLU-

TION TO THE LIME REACTOR TANK WHERE THE SODIUM SULFITE REACTS WITH LIME TO FORM CALCIUM SULFITE AND

SODIUM HYDROXIDE WHICH IS RECYCLED TO THE ABSORBER.   CALCIUM SULFITE SLURRY IS TRANSFERRED TO THE

ROTARY FILTER.  THE FILTER CAKE FORMED (180 LBS/HR, 55X SOLIDS) IS HAULED TO THE LANDFILL.  THE
                                                53

-------
                                                                             STATUS  TO  JANUARY  1979





                                      SECTION  9  (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGP SYSTEMS ON  INDUSTRIAL BOILERS




FIRESTONE TIRE AND RUBBER CO. ; POTTSTQWN. PENNSYLVANIA (CONTINUED)






WATER BALANCE IS MAINTAINED BY MAKING UP FOR THE LOSSES BY EVAPORATION AND  In THE FtLtt-M  CAKE.




    THE VENTURI SCRUBBER HAS A VARIABLE THROAT ((, IN.  TO IS IN.) AND  IS MAOF OF  316L SS.   THE OPFR-




ATING VELOCITY THROUGH THE VENTURI THROAT  IS 200 FT/SEC 3 130 f.  THE OPERATING  L/G  IS  10 GAL/




1000 ACF.  THE SPRAY NOZZLES ARE ALSO MADE OF 316L  SS.  IHE CYCLONIC  OEMISTER (1.67  FT  OIA  X 7.17




FT HIGH) OPERATES WITH A PRESSURE DROP OF  2" WG.  GAS  VELOCITY THROUGH THE  OEHISTEH  IS  100  FT/SEC




3 130 F.  THE DEMISTER, RECIRCULATION TANK, AGITATOR.  RECIRCULATION PIPING, ANO  THE  FILTER  ARF  HADE




OF 316L SS.  THE INLET DUCTWORK, P.O. FAN, THICKENER,  AND LIME REACTOR TANK ARE  OF CAHBOM STEEL.




THE RECIRCULATION PUMP IS CAST IRON KITH RUB8EH LINING AND THE STACK  IS FRP.




    REFER TO FIGURE 10-13 IN SECTION ia FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS  SYSTEM.









                                        OPERATING HISTORY




1ST QUARTER-1975    THE SYSTEM WENT ONSTREAM BURNING 2.2X SULFUR OIL.  THE  FGD SYSTEM OPERATED  687




HOURS AND WAS CALLED UPON TO OPERATE 819 HOURS, YIELDING A RELIABILITY OF 84.SZ.  DOWNTIME  WAS  DUE




PRIMARILY TO FAILURES OF COMPONENTS SUCH AS PUMP PACKING.









2ND OUARTER-1975    THE SYSTEM OPERATED 1450 HOURS  AND WAS CALLED UPON TO OPERATE 1509  HOURS,




YIELDING A RELIABILITY INDEX VALUE OF 96.4JC.









3RD OUARTER-1975    SYSTEM OPERATED 1436 HOURS, HAS CALLED UPON TO OPERATE  1503  HOURS,  YIELDING




A RELIABILITY INDEX VALUE OF 95.5Z.









4TH OUARTER-1975    SYSTEM OPERATED 1320 HOURS, WAS REQUIRED  TO OPERATE  1493 HOURS,  YIELDING A  RELI-




ABILITY  INDEX VALUE OF 88.4t.  LIME FEEDER MALFUNCTIONING AND THICKENER PLUGGING HERE PROBLEMS.








1ST QUARTER-1976    SYSTEM OPERATED 1961 HOURS, WAS CALLED ON TO OPERATE 2035 HOURS, YIELDING  A




RELIABILITY  INDEX  VALUE OF 96.IX.









2ND OUARTER-1976    SYSTEM OPERATED 1280 HOURS, WAS CALLED UPON TO OPERATE  1335  HOURS,  YIELDING A



RELIABILITY  INDEX  VALUE OF 9S.9Z.









3RD OUARTER-1976    SYSTEM OPERATED 1157 HOURS, WAS CALLED UPON TO OPERATE  1166  HOURS,  THUS DEMON-



STRATING ITS HIGHEST  RELIABILITY  INDEX  VALUE,  99.21.









«TH QUARTER-1976     IN OCTOBER,  THE SYSTEM OPERATED AT A RtLIABILITY  INDEX  (IF  100Z,  UNTIL THt  UNIT




MAS CONVERTED TO  COAL FIRING (2.5 - 3.0*  SULFUK).   THE SYSTEM OPERATED FOR  AN ADDITIONAL  511 HOURS,




OF THE  526  REOUIREO,  DEMONSTRATING A  RELIABILITY  INDEX VALUF  OF 97.21.   IN  NOVEMBER  ANp DECEMBER,

-------
                                                                             STATUS TO JANUARY  1979



                                      SECTION  9  (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGn SYSTEMS ON  INDUSTRIAL HOILENS



FIRESTONE TIRE AND RUBBER CO.  f POTTSTOHN. PENNSYLVANIA  (CONTINUED)






THE SYSTEM OPERATED FOR 1172 HOURS  AGAINST THF REQUIREMENT OF  I2U HOURS.  THEREFORE. THE AVERAGE



RELIABILITY INDEX FOR THE TWO  MONTHS HAS 96.7X.








1ST OUARTER-1977    SYSTEM OPERATED 1193 HOURS, MAS REQUIRED TO OPERATE FOR  1159 HOURS, YIELDING *



RELIABILITY INDEX VALUE OF 81.71.   SYSTEM HAS DESIGNED FOR A MUCH LOWER PARTICULATE LOADING THAN



THAT ACTUALLY ENCOUNTERED ON COAL FIRING.  THE HIGH GRAIN LOADING CAUSED ABNORMAL WEAR AND DOWNTIME



OF THE F.O. FAN.








2ND OUARTER-1977    SYSTEM OPERATED 1598 HOURS, HAS REQUIRED TO OPERATE 1690 HOURS, YIELDING A



RELIABILITY INDEX VALUE OF 83.71.   THE MAJOR CAUSES OF DOWNTIME HERE F.D. FAN EROSION AND PUMP



COMPONENT FAILURES.








3RD OUARTER-19T7    SYSTEM OPERATED 1131 HOURS, WAS REQUIRED TO OPERATE 1197 MuiwS, YIELDING A




RELIABILITY FIGURE OF 99.SX.   THE TOTAL REQUIRED  HOURS WERE LOW IN JULY DUE  TO BOILER HOUSE



SHUTDOWN AND SUBSEQUENT START-UP.








«TH OUARTER-1977    IN OCTOBER, THE SYSTEM OPERATED 432  HOURS  OUT OF THE 511 REQUIRED AS THE BOILER




HAS FIRING COAL.  THE RELIABILITY VALUE HAS THEREFORE 64.6S.   DOWNTIME HAS CAUSED BY PROBLEMS HITH



THE LIME CONVEYOR.  WHEN OIL HAS BEING FIRED THE  SYSTEM  OPERATED 95 OF THE 102 HOURS REQUIRED,



DEMONSTRATING A RELIABILITY VALUE OF 9S.6S.  IN NOVEMBER AND DECEMBER, THE SYSTEM OPERATED 792 HOURS



OF THE REQUIRED «54, WHILE BURNING  COAL, YIELDING A RELIABILITY OF 86.71.  DOWNTIME MAS CAUSED BY




FAN PROBLEMS AND LIME FEEDER PROBLEMS.








1ST QUARTEH-1978    THE SPRAY  NOZZLES, ORIGINALLY 316 STAINLESS STEEL, HERE REPLACED BY 316L SS.




THE SPRAY BARS HERE METALLIZED HITH 316 SS.








2ND QUARTER-J978    THE FAN HAS REPLACED BY A NEW FAN CONSTRUCTED OF AN ABRASION RESISTANT CARRON



STEEL.  THE FAN HOUSING HAS METALLIZED HITH 316 SS.  LEAKS IN  THE VENTUHI SECTION AND DOWNSTREAM



DUCTHORK HERE REPAIRED.  THE FGD SYSTEM EXHIBITED AN AVAILABILITY OF 69.SX FOR THIS REPORT PERIOD.








3RD OUARTER-1978    NO UNUSUAL PROBLEMS WERE ENCOUNTERED DURING THIS PERIOD.  DOWNTIME "AS DUE



TO NORMAL MAINTENANCE.  PRELIMINARY ENGINEERING FOR THE FULL SCALE-UP SYSTEM IS COMPLETE.  FINAL



DESIGN HILL BE DELAYED UNTIL THE ENERGY BILL CURRENTLY BEFORE CONGRESS IS FINALIZED.  PLANT



PERSONNEL ATTRIBUTE THEIR SUCCESSFUL OPERATION OF THE FGD SYSTEM TO A GOOD UNDERSTANDING AND




IN-DEPTH KNOWLEDGE OF PROCESSES AND CONTROLS.
                                                55

-------
                                                                              STATUS TO JANUARY 1979




                                       SFCTION   9  (COHTINUFIJ)




             PERFORMANCE DESCRIPTION  FOB  OPERATIONAL  Fen  SYSTEMS ON INDUSTRIAL HUILERS




FIRFSTONE TTHF AND OURBER CO.  ; POTTSTOWN,  PENNSYLVANIA  (CONTINUED)






1TH OIIABTFR-197R     IN OCTOBER, THE BOILER  WAS  DOWN FOR MAINTENANCE,  HENCE  THF SCRUBBER DID NOT OP-




ERATE.  OMRINR NOVEMBER AND DECFHBER,   THF  SYS1FM  OPERATED  311  HOURS  OF  A  RF.OUIRED 312




HOURS, WHTLF BURNINK COAL, YIELDING A  RELIABILITY  OF  93.71.   DOWNTIME OF 20 HOURS HAS




CAUSED BY BREAKAGE OF BELT ON  RECTRCULATION PUMP HHICH WAS  THEN REPLACED.   SCHEDULED MAINTENANCE




RF.QUIREO AN ADDITIONAL HOUR OF DOWNTIME.
                                                S6

-------
                                                                              STATUS TO JANUARY  1979
                                       SECTION  0 (CnNTIMJFD)
             PERFORMANCE  DESCRIPTION FOR  OPFRMTONAL  FGO  SYSTFMS  ON INDUSTRIAL
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBER OF SEPARATE FGO  UNITS
  NUMBER OF BOILERS BEING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  MEN / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  802 REMOVAL EFFICIENCY
  PARTICIPATE REMOVAL EFFICIENCY
  WATER MAKE-UP
  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
FMC (SODA ASH PLANT)
GREFr- MIVFk, WYOMING
COAl fix SULFUR)
446,000 SCFM (TOTAL - 2 BOILERS)
 2
 2
223 MM (EQUIVALENT)? TOTAL - 2 BOILERS
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM s 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
FMC ENVIRONMENTAL EQUIPMENT
SODIUM CARBONATE SCRUBBING
NEW
MAY, 1976
OPERATIONAL
95X (BOO PPM AT INLET)
REMOVED BY PRECEDING ESP (99.5X)
OPEN LOOP: L/G = 15-20 GAL/1000 ACF
HOLDING POND FOR EVAPORATION
NA2S03/S04 LIQUOR DISPOSED TO COLLECTION POND - NO PRIOR
AERATION.  LANDFILL IN THE FUTURE
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND  INFORMATION
    FMC CHEMICAL CORP. HAS A SODA  ASH PLANT  IN  GREEN  RIVER,  WYOMING.   THE PLANT HAS  TNO COAL-FIRED
POWER BOILERS WHICH BURN 1.0 PERCENT SULFUR  COAL.   THE FLUE  GAS FROM EACH BOILER  (330,000 ACFM AT
320 F) IS TREATED BY A HOTSIOE ESP WITH 208  PLATES  AND A  PARTICULATE REMOVAL EFFICIENCY OF 99.5 *.
    THE FLUE GASES ARE SCRUBBED BY THE  PLANT END-LIQUOR IN TWO SCRUBBERS, EACH WITH  THREE PAIRS OF
OISC-AND-OONUT TRAYS.  THE SCRUBBERS AND THE DISCS  ARE LINED WITH CEILCOTE 103 WHEREAS THE DONUT
PARTS OF THE TRAYS ARE MADE FROM INCONEL 825.   THE  3CRUBBFR LIQUOR  IS  MAINTAINED AT  A PH OF 6.5 AND
IS RECIRCIILATED AT A RATE OF 15 - 20 GALLONS/1000 ACF OF  FLUE GAS.  A  PART OF THE RECIRCULATING
LIQUOR IS CONTINUOUSLY PURGED TO REMOVE SULFITES AND SULFATES FORMED BY THE REACTION OF 302 WITH
SODA ASH.  THE RECIRCULATING PUMPS AND  THE RELATED  PIPING IS RUBBER LINED.  A MESH-TYPE OEMISTER IS
USED IN EACH SCRUBBER.  THE GASES ARE REHEATED  BY DIRECT FIRING OF NATURAL GAS AT THE EXIT OF THE
SCRUBBERS.  THE REHEATED FLUE GAS IS MIXED NITH BYPASSED GAS BEFORE GOING TO THE STACK AT ABOUT
»80 F.  DAMPERS WITH REMOTE CONTROLS REGULATE THE FLOW OF OFFGAS THROUGH AND AROUND  THE SCRUBBERS.
*PPROXIMATELY SOX OF THE TOTAL FLUE GAS IS RUN  THROUGH THE SCRUBBERS.
    AUTOMATIC CONTROLS MAINTAIN SOLUTION LEVEL  IN THE SCRUBBER BASIN.  THE PRIMARY SOURCE OF WATER
HAKE-HP IS PROCESS WASTEWATFR WHICH IS CHANNELED TO A MAKE-UP TANK.  IF MORE MAKE-UP IS REQUIRED,
                                                57

-------
                                                                             STATUS TO JANUARY 1979
                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS
FMC (SODA ASH PLANT): GREEN RIVER, WYOMING (CONTINUED)
RIVER HATER IS TAPPFD.  THE SCRUBBER BLEED STRMM IS DISCHARGED TO A WASTF POND AT A HATE OF ?00-2-j«
GPM AT THE SITE.
    REFER TO FIGURE 14-11 IN SECTION Ifl FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.

                                         OPERATING HISTORY
3RD OUARTER-1977    SOME PROBLEMS OCCURRED WITH THE SCRUBBER LINING AS A RESULT OF FAULTY
INSTALLATION.  THE POSSIBILITY OF RUNNING THE SYSTEM WITH NO REHEAT WAS BEING INVESTIGATED.

4TH OUARTER-1977    THE SCRUBBERS CORRODED AS A RESULT OF FAULTY INSTALLATION OF THE LINING.
THE IMPURITIES IN THE SCRUBBING LTQIIOR CAUSE FOAMING AND SEDIMENTATION ON THE TRAYS.
1ST OUARTER-1978    PIPELINE FHEEZUPS, AND LEAKS FROM THE VANE DAMPERS WERE THE MAIN PROBLEM AREAS.

2ND OUARTER-1978    THE DEMISTER WAS PLUGGED. AND THE RFCTRCULATION PUMP WAS DOWN FOR SOME PERIOD.
PH CONTROL IS NOT VERY EFFECTIVE, CAUSING PH EXCURSIONS TO ABOUT ?.0.  THIS HAS CAUSED SCALING IN
THE PIPELINES AND IN THE TOWER.  FMC TESTS HAVE MEASURED 302 REMOVAL EFFICIENCY IN THE RANGE OF 87X-
94X> DEPENDING ON L/G AND PH.

3RD OUARTER-1978    TWO ANNUAL SCHEDULED OUTAGES OCCURRED DURING THIS PERIOD.  ONE LASTED Z WEEKS
IN AUGUST WHILE THE OTHER LASTED I WEEK IN SEPTEMBER.  MAINTENANCE OH THE FBI) SYSTEM DURING THESE
OUTAGES INCLUDED CLEANING OF THE SYSTEM AND FREEING OF THE OAHPFR.  THE DAMPERS HAD A PROBLEM
OPERATING PROPERLY DURING COLD WEATHER.  IT WAS DETERMINED THAT THE PUMP OUTAGE DURING THE 2ND
QUARTER WAS CAUSED BY A BROKEN SHAFT.  THE SHAFT WAS REPLACED.

«TH OUARTER-1978    DURING THE REPORT PERIOD, NO MAJOR OPERATING PROBLEMS OCCURRED.  ORIGINAL LINING
WAS REINSTALLED ON THE UECIRCULATTON PUMP WHILE USING A SPARE HUMP.  THE BEARINGS OF THE SHAFT ON
THE LOUVER DAMPER WERE ADJUSTED FOR FREE OPERATION OF THE DAMPERS.  NO SCALING PROBLEMS HAVE BEEN
REPORTED.  THF RELIABILITY VALUE OF THE FGD SYSTEM HAS CLOSE TO 1001.

-------
                                                                              STATUS TO JANUARY
                                       SECTION  9 CCflNTtNUFn)
             PERFORMANCE DESCRIPTION  FOB  OPFfcAIIONAI  Fun SYSTEMS i)M INnUSTKTAL
  INSTALLATION NAME
  INSTALLATION IDCATION
  SOURCE CHARACTERISTICS
  SOURCF RATING
  NUMBER OF SEPARATE FGD UNITS
  NUMBER OF BOILERS BFING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEK / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  808 REMOVAL EFFICIENCY
  PARTICIPATE REMOVAL EFFICIENCY
  HATER MAKE-UP
  SLUD6E OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
        MOTORS TORPORAT IIlN
fiAYTfiw, ilHJfl
COAL(0.7T - 2.01 SULFUR)
3f>,000 SCF* (TOTAL - ?  BOILERS)
54,000 ACFM ,1) 500F, FUR EACH OF  TWO
1?<|,000 Lfl/HR STEAM (TliTAL)
18 Ml» (ElJIIIVALtNT) ;  TOTAL  -  2  BflTI E»S
(FOR THIS REPORT,  UNLESS STATED  OTHERWISE,  ?«00  SCFM = 1  FQIIIVALFNT Mw.
THIS IS BFCAUSE GAS  FLOW RATE  rS THF PRIMARY  FACTOR  IN MOnilLF.  SIZING.)
ENTOLETER, INC.
SODIUM HYDROXIDE SCRUBBING
RETROFIT
SEPTEMBER, 1974
OPERATIONAL
661 C1.«3 LB/MM BTU  H  INLET)
97.51 (0.107 LB/MM BTU 9 OUTLET)
50 6PM
WASTEHATER TREATMENT AND DISCHARGE  TU  CITY  S£*ER
NAasns/sna i IQIIOR AT 35 GPM  TO PN-SITE CIABTFICATION AND
DEMATERING FACILITY
SEE SECTION 13 FOR DETAILED  ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION
    IN DAYTON,  OHIO, GENERAL MOTORS OPERATES  A  FACTORY  WHICH MANUFACTURES BRAKES A*0 OTHER PARTS
FOR THEIR AUTOMOBILES.  THE PLANT HAS  TWO  STOKER-FEED,  COAL-FIRED BOILERS WHICH WERF INSTALLED IN
1954 BY BABCOCK AND WILCOX.  EACH BOILER IS RATED  AT  60,000  LB/HR STEAM,  AND BURNS A MAXIMUM OF 3
TONS OF COAL PER HOUR.  THE BOILERS ARE EOIIIPPED WITH INTERNAL  MULTICLONES FUR PRIMARY PARTICULATF
CONTROL.  THE STEAM GENERATED BY THESE BOILERS  IS  USED  FOR BUILDING HEAT  ANn PROCESS NEEDS.  ONE
BOILER tS OPERATED CONTINUOUSLY THROUGHOUT THF  YEAR AND THE  OTHER IS OPERATED APPROXIMATELY 6 MONTHS
PER YEAR.  THE  MAJORITY OF THE TIME (8 - 10 MONTHS/YR)  ONLY  ONE BOILER IS IN SERVICE.
    THE EMISSION CONTROL SYSTEM WAS DESIGNED  TO CONTROL BOTH FLYASH AND 803, AMD WAS SUPPLIED AS A
RETROFIT APPLICATION BY ENTOLFTER, INC. IN SEPTEMBER  1970.   tACH BOILER IS FOLLOWED BY A  BOILER 1.0.
FAN, A PLENUM,  AND A SCRUBBER P.O. FAN.  THF  PIFNUM CAN FUNCTION IN ONE HF THREF WAYS: IT CAM FEED
FLUE GASES TO THE SCRUBBER MODULE: IT CAN BYPASS THE  GASES TO THt ATHOSPHFRF IN CASE HF A SCRUBBER
•»*LFUNCTIONJ OR IT CAN MIX AMBIENT AIR WITH W FLUE  CASES IN CASE OF  LOW L«UO IN ORDFH TO MAINTAIN
CONSTANT AIR FLOW TO THE SCRUBBFR FAN.
                                                59

-------
                                                                              STATUS  TO  JANUARY 1979





                                      SECTION  9  (CINTINUFn)




             t>FRFO»M«NCF DESCRIPTION FOR OPFKATIONAI. FRf> SYSTEMS ON  INDUSTRIAL BUILEHS




GENERAL MOTORS CORPORATION; DAYTON, OHIO (CONTINUED)






    THE SCRUBBER CONSISTS OF THF ENTOLtTtR  "VANE-CARE"  (5 FT. DIA. X  5  FT.  HIGH)  WHICH  IS HOUSED IN




A CONICAL BOTTOM SFCIION (« FT. OIA. X 5 FT. HIGH), AN  INTERMEDIATE  SECTION (*. FT. DIA.  X




5 FT. HIGH), Ann A DISENGAGEMENT 70NE (10 FT. DIA. X IS FT. HIGH).   THE FLUE  GAS  (31,000 ACFM




9 SOOF) ENTERS THE BOTTOM SFCTION  TANGENT!ALLY.   RECIRCULATING LIWJOR IS  SPRAYED  FROM THE TOP OF




THE VANE CARE SECTION, WHICH CAN BE MOVED VERTICALLY TO VARY THE PRESSURE DROP ACROSS THE SCRUBBER.




A PRIMARY OEMTSTER IS LOCATED ABOVE THE PREVIOUSLY MENTIONED INTERMEDIATE SECTION AND A  SECONDARY




DEMISTER IS LOCATED ATOP THE DISENGAGEMENT  70NE .  THE GAS THEN PASSES THROUGH A STUB STACK TO THE




ATMOSPHFRF.  SCRUBBtNR LIOIIOR IMPINGES ON THE BOTTOM OF THE VANE CAGE AND A SPRAY CHAMBER EFFECT




PROVIDES THF so? RFMOVAL.  SCRUBBER UNDERFLOW, CONTAINING PARTICULATE AND A NA2so3/soa  SOLUTION is




SENT TO THE RECYCLE TANK, WHERE MAKEUP WATER AT A RATE OF 50 GPM IS  ADOF.O.  RECYCLE PUMPS TAKE




LIQUOR FROM THE RECYCLE TANK TOP,  ALONG NITH THE  CAUSTIC STREAM ADDED AT  A  RATE OF 14 GALLONS




PER HOUR TO THE FEED LINE, AND RECIRCULATE  IT TO  THF TOP OF THE VANE  CAGE AT  A RATE  OF  200 GPM.




THE L/6 RATIO IS 6 GAL/1000 ACF, AND A TYPICAL PRESSURE DROP ACROSS  THE SCRUBBER  IS  7 IN. NG.  A




BLEED OFF FROM THE REC1RCULATION LINE (50 GPM) IS PURGED TO A WASTEWATER  TREATMENT FACILITY,  WHICH




CLARIFIES ALL THF PLANT WASTE STREAMS, ADJUSTS THE PH  (7-0), AND DISCHARGES TO CITY  SENERS.




    ABSORBER MODULES, DEMISTERS, STACKS, AND THE  RECYCLE TANK ARE CONSTRUCTED OF  316L STAINLESS




STEEL.  THE SCRUBBER i-.D. FANS, PLENUMS, CAUSTIC  TANK,  CAUSTIC PUMP,  AND  INLET DUCTWORK  ARE ALL




CARBON STEEL.  THF RECIRCULATION PUMPS AND  PIPING ARE RUBBER-LINED.




    THE TOTAL INSTAI.LFD COST OF THE SYSTEM  WAS (666,000 IN 1974 DOLLARS.  THE AVERAGE OUTLET  803




CONCENTRATION IS 0.31 LB/MM BTU, WELL UNDER THE REGULATION OF 1.0 L8/MM BTU.  THE OUTLET PARTICULATE




LOADING IS 0.107 LB/M" BTU AND THE REGULATION IS  0.177  L8/MM BTU.




    PFFER TO FIRURE l«-!5  IN SECTION in FOR A DETAILED  PROCESS FLOW  DIAGRAM OF THIS  SYSTEM.









                                         OPERATING HISTORY




4TH OIIARTFR-1974    UPON START-UP, SEVERAL  PROBLEMS WERE ENCOUNTERED.  PARTICULATE BUILDUP CAUSED




PLUGGING OF THE RECYCLE  TANK DRAIN AND WASTE STREAM SUMP PUMPS.  MR PURGE  STREAMS WERE INSTALLED TO



ALLFVTATE THESE PROBLEMS.









 1ST QUARTEH-1975    THE  DAMPERS  AND DAMPER  CONTROL SYSTEMS HERE MAJOR PROBLEMS.   THREE  SETS OF




EXPANSION JOINTS HAD  TO  BE  INSTALLED BEFORE ACHIEVING PROPER FLOW CONTROL.








ZHD  OIIAHTER-1975    A  FAN  BEARING  HAD  TO BE REPLACED  THREE TIMES.









 JRD  OUARTFR-1975     INSTRUMENTATION  AND  CONTROL  PROBLEMS PROMPTED WIRING  REVISIONS.








 4TH  OIIARTF»-1<»7«>     THf  FGO SYSTEM DEMONSTRATED  AN  AVAILABILITY OF  93 PERCENT
                                                 60

-------
                                                                              STATUS  in JANUARY



                                       SFCUON  9 (CONTINUED)




                        E  INSCRIPTION FOP OPFRAIIONAI  pen SYSIFMS ON iNniisrwtii  HHTI.FWS




GENERAL MOTORS  CORPORATION;  DAYTON, OHIO (CONTINUED)











1ST QUARTEK-1377     T*hR£ «FRE MECHANICAL PROBLEMS MTH THE v»t,E CAGK URIVt.  THI- ACCESS IJOOK




DEVELOPED LFAKS AND  THfc LIQUOR CORROOFO THE OUTER SURFACE OF THE INLET DUCT AROUND THE ACCESS DOOR.









aTM nUARfER-1977     CORROSION AM) PLUGGING PRflHLEMS CONTINUED TO HAMPER SCWUBftER OPERATIONS.




HOWEVER. USUALLY  WHEN  A SCRUBBER IS DOWN, THE OTHER BOILER IS FIRED UP WHILE REPAIRS AWE MADE TO  THE




OOWNEO UNIT.









1ST IJIIARTFH-197H     THE PRIMARY OFMISTER WAS SEVERELY CORRODED DUE TO ACID DROPPING  DOWN ONTO IT




FROM THE UPPER  PEMISTFK.









HMD QUARTFR-197«     THE FOLLOWING SYSTEM MODIFICATIONS WERE BEING PLANNED: THF INTERMEDIATE SECTION




WILL BE REMOVED,  THE PRIMARY OEMISTER WILL BE REPLACED BY A SIMILAR VANE-TYPE HASTELLOY-G OEMISTEH,




THE SECONDARY OEMISTES WILL  BE REPLACED BY A RADIAL VANE HASTELLOY-G DEMISTER, AND A CONVEX




IMPINGEMENT BAFFLE PLATE  OF  HASTELLOY-G WILL BE INSTALLED ABOVE THE PRIMARY I1EMJSTER TO ASSIST IN




RAPID DRAINAGE  OF THE  ACID DROPLETS.
3RD QUARTFR-197*     THE  MODIFICATIONS DESCRIBED IN THE ?ND OUARTER 1978 ARE STILL IN THE DESIGN PRO-



CESS.  WORK INCORPORATING  THE MODIFICATIONS SHOULD BEGIN ABOUT THE END OF OCTOBER.




    THE SCRUBBER  LINING  OF COAL  TAR EPOXY WAS A8RADEO IIFF AND A CARP.OLENE LINER WAS INSTALLED.




THIS LINING HAS BFE1 FLAKING OFF TN PLACES.



    THE PH PROBES AND PH MONITORING SYSTEM ARF BEING REDESIGNED SINCE THE SYSTEM CURRENTLY IN USE



SEEMS TO BF CONTINUALLY  OUT OF CALIBRATION.  AN ULTRASONIC CLEANER WAS INSTALLED BUT IS NOT WORKING




WELL.  THE PH MONITORING SYSTEM  IS A DUAL PROBE SYSTEM WHICH ALLOWS A PROBE TO RE IN USE WHILE THE




OTHER IS CLEANED.








«TH QIIARTFR-197*     01IRING THE REPORT PERJUO THE SCRUBBERS WERE RECONSTRUCTED.  NE« HASTELLOY-6 MIST



ELIMINATORS *FRE  INSTALLED,  AS DESCRIBED IN ?ND OUARTER-i<»7«.  WORK IS SCHEDULED TO BEGIN ON



INSTRUMENTATION MODIFICATIONS ABOUT MID-JANUARY.  THESE INCLUDE REMOVAL OF THE FLUE GAS FLOW SENSORS



AND INSTALLATION  OF  A  NE*  PH MONITORING SYSTEM.  *ORK WILL 8E DONE ON ONE MODULE AT A  TIME, AND



ONLY IB HOURS OF  MUTUAl  DOWNTIME ARE EXPECTED FOR HOOK-UP.  THE PHENOL SCRUBBER LINING SUPPLIED BY




CARBOLINE HAS FLAKED  OFF.   NO PLANS CURRENTLY EXIST TO RELINE THE SCRUBBERS.

-------
                                                                             STATUS TO JANUARY 1979
                                      SECTION  <» (CONTINUED)
             PERFORMANCE  OESCRIPTTON FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION  NAME
  INSTALLATION  LOCATION
  SOURCE  CHARACTERISTICS
  SOURCE  RATING

  NUMBER  OF  SEPARATE FGO UNITS
  NUMBER  OF  BOILERS  BEING CONTROLLED
  SOURCE  CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW  t RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  803  REMOVAL EFFICIENCY
  PARTICULATE REMOVAL EFFICIENCY

  WATER  MAKE-UP
  SLUDGE  OR BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
GENERAL MOTORS CORPORATION
PARMA, OHIO
COAL C2.5X SULFUR)
las.aoo SCFM (TOTAL - « BOILERS?
3?0,000 LB/HR STEAM (TOTAL)
 1
 4
6S M»s (EQUIVALENT); TOTAL - « BOILERS
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 3CFM = \ EQUIVALENT
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE  SIZINE
GM ENVIRONMENTAL
DOUBLE ALKALI (DILUTE)
RETROFIT
MARCH, 1970
OPERATIONAL
90% (800-1300 PPM 3 INLET)
e« (AT INLET: UNITS i«? - 1.75 LB/CIN; UNITS s*« - i.es
LB/MJN)
CLOSED LOOP
OEWATERED SLURRY TO LANDFILL
50*1 SOLIDS  (CAS03/SO*)) SLUDGE TO DRYING POND AND LANDFILL
SEE SECTION  13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
   THE CHEVROLET PARMA PLANT OF GENERAL MOTORS IS LOCATED NEAR CLEVELAND, OHIO.  THE PLANT HAS FOUR
SPREADER-STOKER BOILERS FIRED BY TRAVELING GRATES, CAPABLE OF PRODUCING A TOTAL OF 320,000 LB/HR OF
STEAM AND GENERATING 138, 
-------
                                                                              STATUS  TO  JANIJAWT  1970




                                       SECTION  Q (CONTINUED)




             PERFORMANCE  DESCRIPTION FOP OPFWM T'INAI  FRO SYSTEMS DM INDUSTRIAI  wnn FVS




GENERAL MOTORS CORPORATION;  PARMA,  OHIO (CONTINUED)






FROM 136-?«?0 PPM FOR  THF  SCRUHMERS.




    THE SULFUR DIOXIDE CONTAINED  IN THE HfllLEH FLUE r,AS IS ABSORBED BT A REGENERATED CAUSTIC




SOLUTION fO.l MOLAR NAOH), FORMING  A SOLUTION OF SOLUBLE SODIUM SALTS.  THE SPENT  CAUSTIC  IS  THEN




REGENERATED fl* REACTING" THE  SODIUM  SALT SOLUTION WITH SLAKED LIME, RESULTING l'-t THF  FORMATION OF




CALCIUM SULFITE'SIII.FATE SOLIDS,  WHICH ARE SEPARATED OUT OF THF SOLUTION.  NEXT, SODA »SH  !S




ADDED TO THE SOLUTION IN  ORDER To MAKE UP FOR SODIUM LOSSES AND MINIMIZE THE SCALE POTENTIAL  FROM




THE CALCIUM WHICH REMAINS IN SOLUTION.  THE REGENERATED CAUSTIC FORMF.n IS THEN RECYCLED HACK  TO THE




SCRUBBER POR ADDITIONAL SULFUR DIOXIDE »E»OVAl.  THF CALCIUM SALT AND FLY ASH SLUDGE VsHtC* RESULTS




IS DEWATEREO AND HAULED AWAY BY  TRUCK TO AN OFF-SITE LANDFILL.






EQUIPMENT SPECIFICATIONS






SCRUBBERS.  EACH OF THE 4 SCRUBBERS IS 10.S FT OIA X ?2.S FT HIGH X It GAUGE THICK AND  CONTAINS 3




BUBBLE-CAP TRAYS.  ALL THE SCRUBBERS AND TRAYS AHE MADE OF JlbL SS.  THE SCRUBBERS HAVE A  TIISNDOwN




RATIO OF 3 AND ALSO HAVE  A BYPASS DUCT.  THE DFSIGN L/G RATIO IS ?.0 GALLONS/ACF HUT  THIS




MAY BE VARIED DURING  OPERATION.   THE PRESSURE DROP ACROSS THE SCRUBBER RANGFS BETWEEN 8-9  IN. «G.






OEMISTERS.  ORIGINAL  316  SS  MIST  ELIMINATORS Wt RE CORRflOFD DUE TO CONOENSA T III* AND WERE «KPLACpn BY




FLEXIMESH-TYPE POLYPROPYLENE MIST ELIMINATORS.






RECYCLE TANKS/PUMPS.   ALL THE a  RECYCLE TANKS ARE MILD STEEL WITH TAR TYPF  RESIN COATING.   THE  PUMPS




(6 TOTAL. 2 SPARE) ARE CENTRIFUGALS WITH MILD STEEL CASING ANO HAVF RUHKER  I(MINGS.  THF  PUMP MOTORS




ARE aO HP.






CHEMICAL MIX TANKS *  AGITATORS.   BOTH THE MIX TANKS ARE MILD STEEL *ITH 500(1 GALLONS CAPACITr.   THE




DESIGN RESIDENCE TIME IS  7 MINUTES.  NEW AGITATORS ARE PROPELLER TYPE.  THESE ARE  SPECIALLY DESIGNFO




TO BIVE HIGHER FLOW RATE  THROUGH  THE BLADES.  THE DRIVE RATINGS ARE 5 HP AND 05 WPM.






CLARIFIERS.  BOTH THE CLARIFIERS  (60 FT DIA X 10 FT LIQUID DEPTH) HAVE A CONICAL ROTTOM ANO 300,000




GALLONS CAPACITY.  THE DESIGN RETENTION TIME IS ABOUT a HOURS AT A FLOW RATF OF 1?00 GPM.








VACUUM FILTERS.  BOTH THE VACUUM  FILTERS HAVE 500 SO. FT. OF SURFACE AREA KtTH A 10 FT  DRUM DIA-




METER.  THE DRUM DRIVE SPEED IS  u.5 RPM MAXIMUM.






FILTRATE TANK/PUMPS.  THE TANK (9 FT DIA X 7 FT HIGH) IS MRO STEEL AND HOLDS 6ftO GALLONS OF




FILTRATE.  THE PUMPS  ARE  MILD STEEL, CENTRIFUGAL AND HAVE A CAPACITY OF 300 RPM »T 15 FI. OF  HEAD.







EARLY PROBLEMS AND SOLUTIONS



     THE SYSTEM WAS STARTED  UP ON FEBRUARY ?fl, !<»7a ANO BY APRIL Tl, IT MAO OPERATED FOR 36«  HOURS.




THERE WFRF TWO SCHEDULED  SHUTDOWNS  DURING THIS PERIOD FOR EQUIPMENT INSPECTION:.  THE SFCOND SHUTDOWN

-------
                                                                             STATUS TO JANUARY  1971
                                      SFCT10M  <* (CnivTINUFO)
             PERFORMANCE DESCRIPTION FOB flPITHAT ItJNAl FRO SYSTEMS ON INDUSTRIAL BOILERS
GENERAL HOinRS CORPORATION; PARMA, OHIO (CONTINUED)

REVFALED THAT SOLIDS «*FRE NOT BEING DISCHARGFO FROM THE PRIMARY CLARIFtER RAPIDLY ENOUGH.
AS * RESULT, THE CLARIf-IER RAKE JAMMED.  A PIPING CHANGE HAS MADE TO BLEND THE CAUSTIC FEED
IN KITH THE RFCYCLE LIOUOR.  THIS IMPROVED PFRFORMANCF BUT DID NOT COMPLETELY ELIMINATE
THE PROBLFH.  PREMATURE CAKE CRACKING IN THE VACUUM FILTERS REQUIRED THE PRESENCE OF AN OPERATOR
DURING OPERATION.  CAKE WASHING TO REDUCE LOSSES HAS NOT INITIALLY SUCCESSFUL BECAUSE THE SPRAY
HATER TENDFD TO KNOCK THE CAKE OFF THE DRUM.  ALTERATIONS IN SPRAY PATTERN AND OTHER MEASURES
APPARENTLY SOLVFO THIS PROBLEM.  THERE HAS NO EVIDENCE OF CORROSION OR ABRASION IN THE PUMPS
OR PIPING.
    THE SYSTEM HAS SHUT DOHN FROM MAY 1 TO MAY SB, 1970, BECAUSE OF UNEXPECTED BUILDUP OF SOLIDS  IN
THE CLARIFIER, HITH SUBSEOUENT OVERFLOW INTO THE SCRUBBER.  THE PROBLEM HAS SOLVED BY H USING
A POLYMERIC FLOCCULATION AGENT TO ATTAIN BETTER SETTLING AND 2; WITHDRAWING SLUDGE FROM THE
CLARIFIER AT MORE FHEOUENT INTERVALS.  SYSTEM AVAILABILITY TO THE BOILER HAS 87 PERCENT IN APRIL
1974. LESS THAN 10 PERCENT IN MAY, AND 100 PERCENT IN JUNE, JULY, AND AUGUST AFTER THE SYSTEM HAS
RESTARTED.  PLUGGING BY GYPSUM DEPOSITS IN THE OVERFLOW LINE BETWEEN THE CLARIFIERS AND IN THE
LINE FROM CLARIFIER NO. 2 TO THE MIX TANKS HAS CORRECTED BY RELOCATIN6 A CHEMICAL FEED LINE AND
REPLACING SOME PIPING.  THE SYSTEM HAS DOHN THROUGH JULY AND AUG. 1975 FOR REPLACEMENT OF GRAVITY
FLOH LINES HITH AN OPEN FLUME THAT CAN BE EASILY CLEANED.  THE OPERABILITV INDEX FOR THE FGD SYSTEM
INCREASED SIGNIFICANTLY THROUGHOUT THE COURSE OF 1976.
    REFER TO FIGURE 11-16 IN SECTION 14 FOP A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.

                                         OPERATING HISTORY
        OPERATION HOURS
MONTH   BOILER  FGD SYSTEM  OPERABILITY (X)
MAY-JUN. 75
THE SYSTEM HAS RESTARTED AND PARTICULATE TESTS HERE CONDUCTED IN MAY.  THE SYSTEM HAS SHUT DOWN DUE
TO PLUGGED CHFMICAL FEED LINE TO THE CLARIFIER AFTER RESTART.  AROUND JUNE 10, THE SYSTEM WAS
SHUTDOWN BECAUSE OF SIMILAR PLUGGING IN ANOTHER PART OT THE LINE.  THE UNIT RAN FOR ABOUT TWO HEEKS
IN JUNE.
JUL.-AU6. 75
THE FGD SYSTM HAS OOHN IN JULY AND AUGUST FOR REPLACEMENT OF GRAVITY FLOH LINE WITH AN OPEN FLUME.
OCT. 75   2331     184«         79
THE FGD SYSTEM RESTARTED ON SEPTEMBER B, AND OPERATED DURING THIS PERIOD AT AN AVAILABILITY FACTOR
OF »0  PERCENT.   THE FIGURES GIVEN FOR OCTOBER REPRESENT THE OPERATION HOURS FROM SEPTEMBER 8 TO   "
NOVEMBER 9.
DEC. 75   2135     1250          59
HOLIDAY SHUTDOWN FROM  12/?3 TO  1/4.  DUE TO PROBLEMS WITH SOLIDS AND SOLIDS CARRY-OVER. G.M. CON-

-------
                                                                              STATUS 10 JAMtAHY



                                       SECTION  9 rcflNriMIJF.01



             PERFORMANCE DESCRIPTION  FOR OPFKAITONAI  rr,n SYSTF^S ON INOI.-STHIAI  HOTLFHS



GENERAL MOTOKS CORPORATION;  PARMA,  OHIO (CONTINUED)





        OPERATION HOUPS




MONTH   BOILER  FRP SYSTEM   OPERARILITY (Z)




OIICTEn STPFAM TFSTS DURING DECEMBER TO DETERMINE HHFTHER THE  CARRY-OVER OF SOLIDS WAS OIIE TO A HIGH



SOLIDS RFCIRCULATION PATE.   IMF  FRO SYSTEM *SS DOWN  MOST OF DECEMBER BECAUSE OF THESF TFSTS, WHICH



CAUSED THE I OW flPF.RABILITY FACTOR.




FEB. 76   B997     H9b           «0




G.M. HAS FiJHi'l) SOLIDS CONCENTRATION IN THE HLARTFIfcR TOO HIGH FOR EFFICIENT SYSTEM OPERATION.  4.0.



LITTLF WAS SCHEDULED TO CONDUCT  TESTS ON THE SYSTEM  IN APRIL  AS PART OF AH' FPA EVALUATION PROGRAM.



MAR. 76   IS79      SDH            J




APR. 76   10HO      807           78




THE IOW OPERARILITY INDEX DURING THE  MONTH OF MARCH  RESULTED  FROM EXTENSIVE MODIFICATIONS PERFORMED



ON THE SYSTEM BY G.M. DURING THIS PERIOD THE SCRUB8FR SLOWDOWN AND SCRUBBER FLO* INDICATION SYSTEM




WAS REVISED.  FROM APRIL 19  TO THE  END OF THE MONTH  THE SYSTEM KAS OPERABLE 1001.  DURING THIS



PERIOD ALL SYSTEM MODIFICATIONS  WERE  COMPLETED AND ALL MAJOR  PROBLEM AREAS CORRECTED.



MAY  76   Jl«9     J042           91




JUN. 76    <*?*      8Jft           88



ONE SYSTEM UPSET OCCURRED DURING THE  PERIOD  DUE TO AN OPERATOR ERROR.   BOILER HOURS HERE LOM IN JUNE



BECAUSE OF LOU PROCESS DEMAND.   THE SCRUBBING SYSTEM CHARACTERIZATION STUDY WAS CONCLUDED ON MAY Ifl.




JUL. 76    S99      509          100




AUG. 76    715      715          100



THE BOILER LOAD DEMAND WAS VERY  LIGHT DURING THE REPORT MONTHS, REOU1RING ONLY ONE BOILER BEING



CONTINUOUSLY ON L1NF.  THE SYSTEM WAS DOWN FOR A ONF-WFFK PF.KTQO BECAUSE OF THE ANNUAL PLANT




INVENTORY.  MODIFICATIONS TO THE OPERATION OF THE OF THE GAS  SCRUBBING SYSTEM HAVE INCLUDED:




     ELIMINATION OF POLYMERIC ADDITION.



     ELIMINATION OF SLUDGE BLANKET  FOR FILTRATION.



     HIGH PFHCF.NT SULF»TE CONCENTRATION IN THE FILTER CAKE.



     INCORPORATION OF PH CONTROLLER IN THE CHEMICAL  Mix TANK  REGULATING THE LIME FEED INTO SYSTEM.



     PH CONTROL SHOIJI ft REDUCE THE STOICHIOMFTRIC REQUIREMENTS FROM THE l.?5-1.50 RANGE DOWN TO




     1.10-1.20.



SEP. 76    H09      ggi           HO




OCT. 76   1171      714           63



TWO BOILERS AND THEIR CORRESPONDINK SCRUBBER MODULES WERE IN  SERVICE DURING THE MONTH.  OPERATION



TIME WAS LOORFD PRIMARILY IN THE INITIAL PART OF THE MONTH.  A NUMBER  OF PROBLEMS WERE ENCOUNTERED,




FORCING A SHUTDOWN THROUGHOUT THE REMAINDER  OF THE MONTH.  THESE INCLUDED:



     SOLIOS OPPOSITION AND PLU8GING OF  THF CHEMICAL  TANKS AND REACTORS,  HEOIIIRING SHUTDOWN/CLFANOUT.

-------
                                                                             STATUS TO JANUAkY 1979
                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FUR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL ROlLfHS
GENERAL MOTORS CORPORATION; PARMA, OHIO (CONTINUED)

        OPERATION HOURS
MONTH   BOILER  FGO SYSTEM  OPERABILITY (X)
     REPLACEMENT OF OEMISTER PADS.
     AGITATOR PROBLEMS.
THE SYSTEM MAS RETURNED TO SERVICE THE SECOND KEEK IN OCTOBER.  TWO BOILERS AND THEIR CORRESPONDING
SCRUBBERS WERE PUT BACK IN THE GAS STREAM.  PROBLEMS ENCOUNTERED STEMMED PRIMARILY FROM A MECHANICAL
COLLECTOR MALFUNCTIONING RESULTING IN EXCESSIVE PARTICULATE LOADING IN THE MODULES AND EVENTUALLY
CAUSING WIDESPREAD PLUGGING OF THE LOWER BUBBLE-CAP TRAYS.  SHUTDOWN AND CLEANOUT OF MODULES PLUS
REPAIRS TO THE MECHANICAL COLLECTOR MERE REQUIRED.  SYSTEM RESTART OCCURRED NOVEMBER 8.
MAJOR MODIFICATIONS PERFORMED TO THE DOUBLE ALKALI SYSTEM DURING THE PERIOD INCLUDED THE INSTAL-
LATION OF A GREAT LAKES PH MONITOR AND CONTROL UNIT FOR THE REGULATION OF LIME FEED TO THE REGEN-
ERATION REACTOR-CLARIFIES UNIT.  THIS UNIT EMPLOYS A DIGITAL READOUT AND WAS SCHEDULED FOR OPERATION
SOMETIME IN (NOVEMBER.  SUPERIOR CRYSTAL GROWTH OF THE CALCIUM SULFITE/SULFATE SALTS RESULTED PY
RUNNING A SEEDING LINE BACK TO THE REACTOR-CLARIFIER UNIT.
NOV. 76   1321      787          60
DEC. 76   1559      349          22
DURING THE L*TTER P«RT OF NOVEMBER AND EARLY DECEMBER, THE SCRUBBERS WERE TAKEN OUT OF THE FLUE GAS
PATH BECAUSE OF CONTINUED SOLIDS BUILDUP IN THE MIX TANK.  IN ADDITION, SOME PIPING ARRANGEMENTS
MERE MODIFIED AND THE GEAR REDUCER IN THE MIX TANK HAD TO BE REPLACED.  THE FGD FIGURES REPORTED FOR
THE MONTH OF DECEMBER ARE NOT FULLY REPRESENTATIVE BECAUSE IT IS PART OF THF LOCAL HAW CONTRACT THAT
ONLY UAH PERSONNEL CAN OPERATE THE FGD SYSTEM AND THEREFORE THE SCRUBBERS COULD NOT BE OPERATED.
JAN. 77   J852      608          33
FEB. 77   1462      892          61
THERE WAS A FAILURE OF THE AGITATORS AT THE MIX TANKS.  THEY WERE LATER REPLACED WITH NEW ONES.
THE PLANT MAS SHUTDOWN FOR SOME PERIOD DUE TO CUTBACK OF NATURAL GAS SUPPLY AND REUUEST TO CURTAIL
ELECTRICAL CONSUMPTION.
APR. 77   1300     1158          89
MAY  77   1222     1118          92
BOILER HOURS MERE LOW DUE TO REDUCED SUMMER REQUIREMENTS.
JUN. 77   1180     1103          94
JUL. 77    702      276          39
THE FGD SYSTEM GAVE A VERY HIGH OPERABILITY FOR JUNE.  THE FGD SYSTEM MAS DOWN FOR A CONSIOERA8LF
PORTION OF JULY.  THE CHEMICAL MIX TANK BLEED OFF LINES AND OTHER PIPING HAD TO BE CLEANED OF
SEDIMENTED SOLIDS.
AUG. 77    755      678          90
SEP. 77    7*4      480          71

-------
                                                                              STATUS  TO  JANUARY  1<179
                                       SECTION   9  (CONTINUED)
             PERFORMANCE DESCRIPTION FDR  OPERATTONAI.  FGD  SYSTFMS ON  INDUSTRIAL  BOILERS
GENERAL MOTORS CORPORATION; PARMA, OHIO  (CONTINUED)

        OPERATION HOURS
MONTH   BOILER  FSO SYSTEM  OPERABILITY  (X)
DURING THIS LOW-LOAD PERIOD THE LIME FEED  PUMP  AND LIME FEED  LINES WERE  CLEANED.   GENERALLY,  EVERY
SUMMER AN ANNIIHL FGD OVERHAUL  IS CARRIED  OUT.
OCT. 77   1277      398          '31
NOV. 77   1380      980          67
DEC. 77   1790      968          5«
THE CHEMICAL MIX TANK AGITATORS WERE TOTALLY REDESIGNED AND REPLACED BY  HIGH-CARSON  STEEL.  PROPELLER
TTPES.  THE BLADES WERE SPECIFICALLY DESIGNED TO  INCREASE THE FLO* THROUGH  THE  PROPELLERS,  THUS
INCREASING THE INTENSITY OF MIXING.  DUE  TO  THANKSGIVING  HOLIDAYS IN NOVEMBER AND  CHRISTMAS AND  NEW
YEAR HOLIDAYS IN DECEMBER. THE FGO SYSTEM  HAD LOWER  OPERATION HOURS.  SOME  OF THE  BOILERS  HAD TO BE
RUN FOR BUILDING MAINTENANCE.

1ST OUAHTER-1978    THE BOILERS OPERATED  FOR 3370 HOURS WHEREAS THE  FGD  OPERATED FOR 70 HOURS.
THE OPERABILITY INDEX WAS THEREFORE  1.25X.  THE RAKE SHAFT IN THE THICKENER WAS BROKEN  IN  EARLY
JANUARY.  THERE WAS A CONSIDERABLE DELAY  IN  RECEIVING REPLACEMENT PARTS.   IN ADDITION,  SEVERE WINTER
(BLIZZARD* HEAVY SNOW) MADE IT IMPOSSIBLE  TO PERFORM ANY  REPAIRS.

ZHD OU»RTER-t978    THE F6D SYSTEM OPERATED  FOR 3669 HOURS, AND THE  BOILERS OPERATED FOR 3an HOURS.
THE OVERALL OPERABILITY WAS 78.8 PERCENT.   IN APRIL,  THE  PIPELINES WERE  FLUSHED AND  CHEMICAL  TANKS
HERE CLEANED ALONG WITH SCRUBBER INTERNALS,  STACKS AND MIST ELIMINATORS.   IN JUNE, THE  AVAILABILITY
HAS 100 PERCENT.  DURING THE SUMMER QUARTER, USUALLY A LOW-LOAD PERIOD,  SEVERAL MODIFICATIONS MERE
SCHEDULED.  NEW VACUUM PUMPS AND FILTERS  WILL BE  INSTALLED, AND THE  LIME  SLURRY FEED PUMPS
HILL BE REPLACED BY DIAPHRAGM  PUMPS TO AVOID PLUGGING OF  CONTROL VALVES.  THE NEW FILTER CLOTH, MADE
OF POLYPROPYLENE, HAS GIVEN MUCH LONGER FILTERING LIFE (ABOUT  3 MONTHS)  THAN THE OLD ONE,  MADE OF
NYLON.  THIS IS DUE TO THE POOR FILTERING  CHARACTERISTICS OF  THE NYLON (PLUGGING).

SRO OUARTER-1978    ?QH THIS PERIOD THERE  HAS BEEN NO DOWNTIME DUE TO EQUIPMENT OR PROCESS  FAILURE.
WARREN-RUPP DIAPHRAGM PUMPS WERE INSTALLED TO REPLACE THE EXISTING LIME SLURRY  FEED  PUMPS.   THE
PLANT REPORTED loos OPERABILITY.

«TH OUARTER-1978    DURING OCTOBER AND NOVEMBER THE  BORERS OPERATED  3815 HOURS AND  THE FGO SYSTEM
OPERATED 670 HOURS FOR AN OPERABILITY  OF S3.81.   NEW  FRP  STACKS (9.5  FT. OIA. X 38 FT.  HIGH)  WERF
MOUNTED ON TOP OF THE ABSORBERS, REPLACING THE OLD STAINLESS  STEEL-LINFD ONES WHICH  WERE BADLY
CORRODED.  MODIFICATIONS WERE  MADE TO  THE  TOP OF  THF  SCRUBBERS.  THESE INCLUDED ENLARGING  THE
OPENING TO THE STACK TO RFOUCE THE GAS VELOCITY,  AND  REPLACING THE FLEXTMFSH  MIST ELIMINATOR  WITH A
POLYPROPYLENE CHEVRON DEMISTER.  DURING THE RECONSTRUCTION, WATERLINES WERE  TESTED IN PREPARATION
                                                67

-------
                                                                                STATUS Til JANUARY  1979




                                                 o (CONTIMUFI)J




                          DESCRIPTION FO»  OPFKAIIOMI. F&f) SYSTEMS ON  TNDIISTKTAI  BOILERS




GENERAL MOTORS  CORPORA! riJMs PARMA, OHIO  (CONT TNMEO)






FOR HINTER  AND  THF  NFW VACUUM FILTER PUMPS  WKf^  t«»STAlLfO.  PFAK BOILER LOAPS  FOR  THIS WINTER ARE




EXPFCTED TO BE  ABOUT 175,000 LBS/HOIJR MjTM  3  BOILFHS OPERATING SIMULTANEOUSLY.
                                                 6fi

-------
                                                                              STATUS TO JANUARY 1979

                                       SECTION  9 (CONTINUED)

             PERFORMANCE  DESCRIPTION FOB (IPf WAT IdNAL  FED SYSTEMS  ON INDUSTRIAL  RnlLFkS
  INSTALLATION NAME

  INSTALLATION LOCATinN

  SOURCE CHARACTERISTICS



  SOURCE RATING



  NUMBER OF SEPARATE FGD  UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY




  CONTROL SVSTEM VENDOR

  CONTROL PROCESS

  NEW / RETROFIT

  START-UP DATE



  CONTROL SYSTEM STATUS

  302 REMOVAL EFFICIENCY

  PARTICIPATE REMOVAL EFFICIENCY

  MATER MAKE-UP

  SLUDGE OR BY-PRODUCT DISPOSAL



  CONTROL SYSTEM COST
GENERAL MOTORS CORPORATION

PONTIAC. MJCMTGAN

COAL (O.SaX SULFUR)

ALSO MOOD, PAPER, AND CARDBOARD.

107,300 SCFM (TOTAL - 2 80UERS)

350,000 LB/HR STEAM (TOTAL - S BOILERS)

 2

 ?

53 M* (EQUIVALENT)» TOTAL - 2 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE* 2000 SCFM = 1 EQUIVALENT MW.
THIS IS BECAUSE GAS FLOW RATE IS THF PRIMARY FACTOR IN MODULE SIZING.)

GM ENVIRONMENTAL

SODIUM HYDROXIDE SCRUBBING

NEW

APRIL, 1976

SYSTEM OPERATED TWO MONTHS IN EARLY 19T3.

OPERATIONAL

NOT DETERMINED

851

OPEN LOOP; 50 GPM

DEWATERED SLURRY TO LANDFILL

5X SOLIDS SLURRY DEWATERFD AND TO LANDFILL

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION

    THE GENERAL MOTORS TRUCKS AND COACH PLANT  LOCATED  AT  PONTIAC, MICHIGAN OPERATES SEVERAL BOILERS

TO GENERATE STEAM FOR BUILDING HEAT  AND PROCESS  REQUIREMENTS.   TWO OF  THESE BOILERS, NOS. 6 AND 8,

ARE SPREADER STOKERS AND FIRE A MIXTURE OF COAL  (O.BOX SULFUR)  AND SOLID REFUSE  (PAPER AND CARD-

BOARD).  BOILER NO. 6, INSTALLED IN  197? BY ERIE CITY, IS HATED AT 188 MM BTII/HR OR ISO,000 LBS/HR

OF STEAM.  BOILER NO. fl, INSTALLED IN  197? BY  RILEY, IS RATED AT 250 MM BTU/HR OR 200,000 LBS/HR

OF STEAM.  THE PARTICULATE EMISSIONS ARF CONTROLLED BY MECHANICAL COLLECTORS SUPPLIED BY ZURN

INDUSTRIES, DESIGNED TO OPERATE AT 93X EFFICIENCY, WITH A PRESSURE DROP OF ABOUT 3 IN. N6.

    PEABODY ENGINEERING SUPPLIED 2 WET SCRUBBERS IN APRIL 1976, PRIMARILY FOR ADDITIONAL PARTICULATE

CONTROL.  EACH SCRUBBFRU2 FEET DIA  X  21.5 FEET HIGH) CONTAINS  5 IMPINGEMENT TRAYS AND OPERATFS

«1TM AN L/G OF 5 GAL/1000 ACF.  THE SCRUBBER EFFLUENT IS  MIXED WITH CAUSTIC AND MAKEUP WATER IN A

HOLD TANK, AND PUMPED TO A CLARIFIER.  THF OVERFLOW IS RECYCLED TO THE SCRUBBER, THUS SIGNIFICANT

302 CONTROL IS ACHIEVED.  THE UNDERFLOW IS SENT TO A WASTE TREATMENT PLANT, WHERE THE FLYASH IS RE-

MOVED AND LANDFILLEO.  THE EFFLUENT DISCHARGF  FROM THE WASTE TREATMENT PLANT TS 10 - 25 6PM.

-------
                                                                             STATUS TO JANUARY  1979
                                      SFCTIOta  0 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPFKATTONAI  FRO SYSTFMS ON INDUSTRIAL BOILERS
GENERAL MOTORS CORPORATION; PONTIAC. MICHIGAN (CONTINIIEO)
    THE SCRUBBERS, TRAYS, AND MIST ELIMINATORS (RADIAL VANE TYPE) ARE ALL MADF OF 516L SS.
    REFER TO FIGURE 18-17 IN SECTION la FOR A DETAILED PROCESS FLOW DIAGKAM OF THIS SYSTEM.

                                         OPERATING HISTORY
3ND GUARTER-1976   UNSTABLE PH CONTROL AND WEAR OF MECHANICAL EQUIPMENT HANDLING THE FLYASH SLURKY
HERE MAJOR STARTUP PROBLEMS.

3RD OUARTER-1'm   AN AVAILABILITY OF 100 PERCENT HAD BFEN REPORTED WHEN BURNING A MIXTURE OF COAL
AND REFUSE.  THE SCRUBBER DISCHARGE SLURRY CAUSED NEAR DUE TO ITS FLYASH CONTENT.

4TH QUARTfR-1977    FLYASH ABRASION IN THE PUMPS AND PIPING CONTINUED TO BE THE PROBLEM.

1ST OU*RTFH-1<>78    FLYASH CAUSED SERIOUS EROSION OF LIOUIO HANDLING EQUIPMENT.

3ND OUARTER-1978    IT MAS DECIDED TO INSTALL PRESSURE FILTERS IN THE SCRUBBER EFFLUENT LINES TO
REMOVE FLYASH.

3BD OUARTER-1178    THE PRESSURE FILTERS WERE INSTALLED AND ARE WORKING WELL.  NO OTHER
PROBLFMS OCCURRED DURING THE REPORT PERIOD.

«TM OU*RTER-1<»78    NO NEW OPERATING PROBLEMS DEVELOPED DURING THIS RFPORT PERIOD.  THE PRESSURE
FILTERS HERE INSTALLED IN THE RECIRCULATION PIPING BETWEEN THE RECYCLE PUMP AND THE INLET TO THF
ABSORBER.  THEIR PERFORMANCE THUS FAR HAS BEEN RATED AS EXCELLENT.
                                                70

-------
                                                                             STATUS  10 JANUARY



                                      SFCTJON  9  (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FED SYSTEMS ON  INDUSTRIAL ROILFXS
  INSTALLATION NAME



  INSTALLATION LOCATION



  SOURCE CHARACTERISTICS
   *


  SOURCE RATING



  NUMBER OF SEPARATE FGO UNITS



  NUMBER OF BOILERS BEING CONTROLLED



  SOURCE CAPACITY










  CONTROL SYSTEM VENDOR



  CONTROL PROCESS



  NEN / RETROFIT



  START-UP DATE



  CONTROL SYSTEM STATUS



  803 REMOVAL EFFICIENCY



  PARTICULATE REMOVAL EFFICIENCY



  HATER MAKE-UP



  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
GENERAL MOTORS CORPORATION



ST. LOUIS, MISSOURI



COAL C5.ST SULFUR)



64,000 SCFM (TOTAL - 2 BOILERS)



 2



 P




3S MB (TOTAL - a BOILERS)



(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM s J  EQUIVALENT Ml*.

THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)



A.O. LITTLE



SODIUM HYDROXIDE SCRUBBING



RETROFIT



197?



OPERATIONAL



90+1 (2000 PPM 3 INLET)



REMOVED BY PRECEDING CYCLONE AND FSP



OPEN LOOP



WASTEWATER TREATMENT AND DISCHARGE TO CITY SEWER



NA8S03 OXIDIZED TO NA3S04, PH NEUTRALIZED AND DISCHARGED  TO



CITY SEWER SYSTEM



SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION



    THE GENERAL MOTORS CORPORATION PLANT LOCATED IN ST. LOUIS, MISSOURI OPERATES a COAL-FIRED BOIL-



ERS.  THO OF THESE BOILERS, ONE PULVERIZED COAL-FIRF.D ANO THE OTHER A SPREADER STOKER, ARf RATED AT



A TOTAL OF 250,000 LB/HH STEAM ANO GENERATE ABOUT 60,000 SCFM OF FLUE GAS.  COAL COMPOSITION IS



TYPICALLY 3.HI SULFUR AND 10X ASH.  THE ST. LOUIS SOa EMISSION REGULATION OF l.a LBS/MM BTU APPLIES



ONLY FROM OCTOBER THROUGH MARCH, ANO THE SCRUBBERS OPERATE ONLY DURING THIS PERIOD.  FLUE GAS FROM



ALL FOUR BOILERS EXITS THROUGH A COMMON STACK ANO SUFFICIENT FLUE GAS FROM THE TWO CONTROLLABLE



BOILERS IS SCRUBBED TO MAINTAIN THE REGULATION AT THE STACK OUTLET.  THE REMAINING FLUE GAS BYPASSES



THE SCRUBBERS, AND A COMPLEX DAMPER SYSTEM ALLOWS PLANT PERSONNEL TO VARY THE SCRUBBER/BYPASS RATIO.



BOTH BOILERS ARE EUUIPPEO WITH CYCLONES FOR PAkTICULATE REMOVAL, AND THE PULVERIZED COAL UNTT ALSO



UTILIZES AN ESP.



     THE SCRUBBER CONSISTS OF A THREE-STARE IMPINGEMENT TOWER WITH A CHEVRON MIST ELIMINATOR.  THE



SYSTEM IS EQUIPPED WITH DIRECT STEAM COIL REHEAT.  THE THAY TOwER AND MIST ELIMINATOR ARE CONSTRUC-



TED OF 316L STAINLESS STEEL.
                                                71

-------
                                                                             STATUS TO JANUARY  1479




                                      SECTION  9  (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS




GENERAL MOTORS CORPORATION; ST. LOUIS. MISSOURI (CONTINUED)






                                         OPERATING HISTORY




3RD QUARTER-1977    «N OPERABILITY OF IQOX HAS REPORTED DURING THE MAY-AUGUST PERIOD.








4TH QUAHTER-1977    IN SPITE OF A CHEVRON DEMISTER AND 60 f REHEAT, THE STACK LINER WAS CORRODED.









1ST QUARTER-lire    THE OUCTMORK DOWNSTREAM OF THE SCRUBBERS DEVELOPED SOME LEAKS.









2ND QUARTER-I978    A HORIZONTAL PORTION OF THE DOWNSTREAM DUCTWORK,ABOUT 15-20 FEET IN LENGTH, HILL




BE REDESIGNED TO AVOID STAGNATION OF EXHAUST GASES









3RD OUARTER-1978    THE DOWNSTREAM OUCTMORK MAS RECONSTRUCTED DURING THE REPORT PERIOD.









4TH OUARTFR-1978    NO NEM FGD-RELATEO PROBLEMS HAVE DEVELOPED DURING THE REPORT PERIOD, HOWEVER.




THE PLANT HAS REPORTED THAT PLUME OPACITY HAS BECOME A PROBLEM.
                                                72

-------
                                                                              STATUS TO JANUARY 1979
                                       SECTION  9 (CONTINUED)

             PERFORMANCE  DESCRIPTION  FOR fJPERAT JIJNAI.  FED SYSTEMS ON INDUSTKJAl
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING
  NUMBER OF SEPARATE FGO  UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  302 REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  HATF.R MAKF.-UP

  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
        MOTORS CORPORATION

TONOPANDA, NEW YORK

COAL ft.HI SULFUR)

9?,000 SCFM (TOTAL - 1 BOILERS)

36(000 ACFM d 406 F, F0» EACH OF 3 FGD SYSTEMS

39,600 ACFM d 350 F, FOR 1 FGD SYSTFM

300,000 LB/HR STEAM (TOTAL - 9 BOILERS)

 a

 4

06 MW (EQUIVALENT)? TOTAL - 4 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

FMC ENVIRONMENTAL EQUIPMENT

SODIUM HYDROXIDE SCRUBBING

RETROFIT

JUNE, 1<)75

OPERATIONAL

90Z-95X (1,000 PPM 3 INLET)

90X (1.0 LB/MM BTU AT INLET)

OPEN LOOP

OEWATEREO SLURRY TO LANDFILL

FLY ASH AND NA2S03/S04 WASTE LIQUOR DEwATERED AND THEN TO

SANITARY LANDFILL

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND  INFORMATION

    THE CHEVROLET DIVISION OF GENERAL  MOTORS  HAS A  MOTOR  PRODUCTION  PLANT  AT  TONOWANDA,  NEK  YORK.

THERE ARE 4 COAL-FIRED BOILERS  AT  THE  FACILITY  WHICH  BURN 1.16  PERCENT  SULFUR COAL  WITH  A  HEATING

VAtUE OF 12,650 BTU/LB.  THE TOTAL COAL FEED  RATE  IS  17 TONS/HR WHICH  IS FOUIVALENT TO 412 MM  BTU/HR

WHICH IS EQUIVALENT TO 46 MW OF ELECTRICAL GENERATION.

    ONE SCRUBBER HANDLES 39,000 ACFM AT 350 F WHEREAS EACH  OF THE  OTHER THREE 36,000 ACFM  AT 406 F.

THERE IS A CYCLONF. BEFORE AND AFTER SCRUBBER  FOR OUST COLLECTION AND MIST  REMOVAL PURPOSES, RESPEC-

TIVELY.  THE VARIABLE THROAT VENTURI SCRUBBERS  WERE SUPPLIED BY FMC  CORP.   THE PH OF RECYCLE

SCRUBBER LtniJOR IS CONTROLLED AT 7.0 AND A L/6  RATIO  OF 20  GALLONS/1000 ACF IS USED.  PRESSURE DROP

ACROSS EACH SCRUBBER IS 10 IN.  WG.  CAUSTIC SODA IS AODFD TO THE SPENT LIQUOR IN A  SEPARATE RECYCLE

T*NK.  THE BLEED OFF RATE FROM  THE RECYCLF TANK VARIES FROM 25  - 100 6PM.   THE DISCHARGE CONTAINS

FLYASH AND SOOIUM SULFATE.  THE FLYASH  IS CONTROLLED  AT LESS THAN  It SUSPENDEn SOLIDS.   THE EFFLUENT

IS OISCHARBFO TO THE WASTE TREATMENT PLANT AFTER AERATION.  THE  AVERAGE INLFT CONCENTRATIONS ARE
                                                73

-------
                                                                             STATUS TO JANUARY  1979


                                      SECTION  9  (CONTINUED)

             PERFORMANCE DESCRIPTION FOB OPERATIONAL F60 SYSTEMS ON  INDUSTRIAL BOILERS

GENERAL MOTORS CORPORATION TONOMANOA, NEN YORK (CONTINUED)


8.«S LB/N« BTU OF SOZ AND i LB/NN BTU OF PARTICULATE.  THE EFFICIENCY OF S02 REMOVAL  IS 90*  HHEREAS

TM«T Of PARTICIPATE REMOVAL IS 80«~9SS.

    E*CN SCRUBBER AND THE CYCLONIC OEMISTER  IS MADE OF 3I6L SS.  PLUME REHEAT IS NOT  INCORPO ATED

WTO TMf SYSTEM.  THE ENER6Y REQUIREMENTS FOR THE SYSTEM ARE ABOUT S - 51 OF THE FUEL BURNED.

    0CPCR TO FIGURE IB-IB IN SECTION !• FOR  A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.




                                         OPERATING HISTORY

•D KHUTOR-1977    AVERAH OPERABILITT DURING THIS PERIOD MAS REPORTED TO BE 1001.




*TN OU*»fBNI*77    MAJOR PROBLEMS HAVE BEEN PH CONTROL AND RECYCLE PIPE EROSION.  CONTROL

            LATINS MIIER VALVE REPLACED FOR  PH CONTROL AND CAST IRON PIPE MAS USED TO

        8* RCCYCLE PIPING.  DURING MOV - DEC CONDENSATION FOLLOWING THE OEMISTER
          c
    COmODEO THE STACK LINING.  A DECISION HAS BEEN MADE TO RELINE THE STACK.




Mt OBMnt*-t«TS    THE STACK MAS NOT RfLINED.
                    ONE MORE CYCLONE NIU. BE RETROFITTED AFTER EACH BOILER IN ORDER TO REDUCE THE

            tttOIM TO THE SCHUBBERS.



MO OIM*TER-t*78    * MIST ELIMINATOR MILL BE INSTALLED TO PREVENT FURTHER CORROSION OF THE STACK

LtNtR.  THE LINER HILL EITHER BE REPLACED OR COATED MTTH AN ACID-RESISTANT MATERIAL.



«T* OOMTER-1978    NO DEFINITE PLANS HAVE BEEN MADE REGARDING THE STACKS.  THE ORIGINAL STACKS

(•MUTED ATOP THE ABSORBERS) ARE STAINLESS STEEL.  THEY ARE CORRODED, BUT NOT BETOND USE.  THE MIST

ELIMINATORS TO BE INSTALLED MILL BE CHEVRON-TYPE.  THE MATERIAL HAS NOT BEEN SELECTED. BUT SOME SORT

or PLASTIC is CONSIDERED LIKELY.   THERE  ARE NO PLANS TO ADD CTCLONES FOLLONINC THE BOILERS, A FACT

      rOUSLY REPORTED DUOINC THE 2ND QUARTER.
                                                 74

-------
                                                                              STATUS  tn  .IANUAHY  i<*7«
                                       SFCTION  3 (CONTINUED)
             PERFORMANCE  DESCRIPTION FOR OPt-WAl lONAI. FGD SYSTF!,S UN  INDUS1RTAI Hl
  INSTALLATION NAMF
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBER OF SEPARATE FGO  UNITS
  NUMBER OF BOILERS BEING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  .START-UP DATE
  CONTROL SYSTEM STATUS
  802 REMOVAL EFFICIENCY
  PARTKULATE REMOVAL EFFICIENCY
  HATER MAKE-UP

  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
GEORGIA-PACIFIC PAPER CO.
CROSSFTT, ARKANS4S
BARK,COAL/OIL (1.5X - ?..OX SULFUR)
220,000 SCFM (I BOILHRI
 1
 \

110 MW (EQUIVALENT)
(FOR THIS REPORT, UNLESS STATED OTHFHWISF,  2000  SCFM  s  \  EHUIVALENT Wrt.
TH]S IS BECAUSE GAS FLO* RATE  IS  THE  PRIMARY  FACTOR  IN  MODULE SIZING.)
A1RPOL INDUSTRIES
CAUSTIC WASTE STHFAM
NEW
JULY, ms
OPERATIONAL
BOX  »500 PPM 3 INLET)
90X  (0.5 GH/SCF AT INLET)
OPfN LOOP; SCRUBBED WITH 2,100 6PM  "BLACK WATER"  FROM PULP
MILL.
WASTFWATER TREATMENT ANO DISCHARGE  TO CITY  SEHER
SEE SECTION 13 FOR DETAILED ECONOMIC  INFORMATION
                                        BACKGROUND INFORMATION
    THE FGD SYSTEM AT GEORGIA-PACIFIC PAPER CO., CROSSETT, ARKANSAS UTILIZES A CAUSTIC PULP  MILL
WASTEWATER STREAM (BLACK  HATER)  TO REMOVf  PARTICULATF ANO S02 FROM FLUE GAS GENERATED HY  A BARK/OIL
OR BARK/COAL BOILER.  THE BOILER IS AN ERIE CITY POWER BOILER RATED AT 600,000 LB/HOUR STFAM,  ANO
SENERATES 220,000 SCFM OF FLUE  GAS, HHICH  IS EUUIVALENT TO HO MW OF ELECTRICAL CAPACITY.  THE
NORMAL OPERATING RANGE IS BETWEEN aOO,000  ANO 500,000 LBS STFAM/HOUR WITH AN OPERATING SCHEDULE t'F
2« HOURS/DAY, 359 DAYS/YEAH.   IT IS ONE OF ELEVFN HOILERS THAT TllBN 5 TURBINES AND SENEHATf;  a1) Ml».
    THE FLUE GAS IS DUCTED  TO A  SINGLE SCRUBBER AT THF RATE OF S20.0UO ACFM 4 JtO F HY MF.A-JS OF A
BUFFALO FORBF 1.0. FAN WHICH  IS  DRIVEN BY  A aOOO HP WFSTINGHOIISE TURBINE.  THE SCRUBBER ITSELF IS
MADE OF 30fl SS ANO CONSISTS OF  AN UNLINED  VENTURI THROAT (
-------
                                                                              STATUS T
-------
                                                                              STATUS 10 JANUARY 197O
                                       SFCT10N  9 fCONTINUED)
                          DESCRIPTION  FOW CiPEKAUllNAl  Fr.n SYSTFMS ON INOHSTMTAL H.ITLFHS
  INSTALLATION NAMF
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBER OF SEPARATE FGD  UNITS
  NUMBER OF HDILFRS BFING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP OATF
  CONTROL SYSTEM STATUS
  303 REMOVAL EFFICIENCY
  SLUOGF OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
GETTY OIL COMPANY
RAKF&SFmO, TALIFORNIA
OTL tl.lX SULFUR)
72,f>00 SCFM (TOTAL - 6 BOILERS)
 1
 f>
36 Mh (EQUIVALENT)? 6 BOILERS, EACH j> 50 MM BTU/HR
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EQUIVALENT MW.
THIS IS BECAUSE SAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZTNB.)
FMC ENVIRONMENTAL EQUIPMENT
SODIUM CARBONATE SCRUBBING
RETROFIT
JUNE, 1977
OPERATIONAL
90*1 (600 PPM 9 INLET)
HOLDING POND FOR EVAPORATION
6 GPM BLEEDOFF TO A SLOWDOWN TANK.  THE SLOWDOWN IS THEN
SENT TO A DISPOSAL POND ONCE A WEEK.
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND INFORMATION
    GETTY OTL COMPANY HAS  AN  OIL  FIELD  NEAR BAKERSFIELO,  CALIFORNIA WHICH OCCUPIES ABOUT IS SQUARE
MILES.  THERE ARE 136 STEAM GENERATORS;  100 WITH A HEAT RATE OF SO MM BTU/HR AND 36 WITH A HEAT
RATE OF SO MM BTU/HR.  THE FUEL USED  IS  CRUDE  OIL WITH 1.11 SULFUR AND A HEATING VALUE OF 6.4 MM
BTU/BBL.  STEAM IS DISTRIBUTED THROUGHOUT  THE  OIL FIELD BY INSULATED PIPELINES AND INJECTED INTO
THE OIL WELLS.  CONDENSATION  OF THE STEAK  REDUCES THE  VISCOSITY OF THE OIL.  WHICH FLOWS FREELY TO
THE SURFACE ALONG WITH THE WATER.  THE  OIL IS  SEPARATED FROM WATER BY DECANTATION IN SETTLING TANKS,
AND PURIFIED BY DISTILLATION  IF REQUIRED.
    THE FLIIF GASES (130,000 ACFH  3 500 F)  FROM SIX BOILFKS C50  MM  BTU/HR EACH)  ARE MANIFOLDED
INTO A TRAY ABSORBER (13.5 FEET DIA X 35 FEET  HIGH)  WHICH  WAS RETROFITTED IN JUNE 1<»77 BY FMC
ENVIRONMENTAL EQUIPMENT DIVISION.  THE PROCESS IS SODIUM CARBONATE SCRUBBING.  THE RECIRCULATION
LIQUOR IS MAINTAINED AT A PH  (IF b.«, WITH  AN L/G RATIO OF  8.1 GAL/1000 ACF.   THE RECIRCULATION FLOW
IS 1000 GPM.  A BLEED STREAM  OF b GPM IS CONTINUALLY SENT  TO THE SLOWDOWN TANK  WHICH IS EITHER
EMPTIED INTO A DISPOSAL POND  OR INJECTED INTO  DEEP WELLS EVERY  WEEK.   THE INLET S02 CONCENTRATION IS
600 PPM.  THE OUTLET IS 60 PPM.  THE ABSORBER,  THERFFOKF,  HAS 901  SOi REMOVAL EFFICIENCY.
    THE ORIGINAL ABSORBER CONTAINED THREE  DISK-AND-DONUT TRAYS  AND AN INCONFL WIRE MESH MIST  ELIMI-
NATOR.  THE ABSORBER MOOULE AND THE STACK  ARE  MADE OF  316L  SS.  WHERFAS THE DOWNSTREAM  DUCTWORK
»ND THE RECIRCIII.ATION PIPING  *(*F MILD STEF.L.   THE RFC tRCIJLATION PUMP  IS RUBBER  LINFD.
                                                77

-------
                                                                             STATUS TO JANUARY  1979

                                      SECTION  9  (CONTINUED)

             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON  INDUSTRIAL BOILERS

GETTY OIL COMPANY! BAKERSFIELO, CALIFORNIA  (CONTINUED)


    SOME IMPORTANT MAINTENANCE PRACTICES ARF:

      1. DAILY CHECK AND CALIBRATION OF PH  CONTROLLERS.

      2. FRFOUENT CHECKS -ON FLOW WATERS (MAKEUP WATER. SODA  ASH, RECIRCULATTON LIQUOR. AND  SLOWDOWN)

         AND FLUID LEVELS  (BLOWDOWN TANK, SODA ASH  TANK, AND SCRUBBER).
                   t--
      3. MEEKLY FILLING OF SODA ASH TANK AND DISPOSAL OF BLOMOOMN.

      4. SCHEDULED LUBRICATION OF PUMPS AND FAN,  SEAL REPLACEMENT.

    REFER TO FIGURE 11-Sl  IN SECTION J« FOR A DETAILED PROCESS FLOW  DIAGRAM OF THIS SYSTEM.



                                         OPERATING  HISTORY

3RD OUARTER-1977    THE RECTRCULATION PUMP  LINFR  WAS CHANGED FROM BUNA-N TO NATURAL RUBBER,  DUE  TO

THE SMELLING OF THE FORMER LINER.  THE RUBBER PINCH VALVE ON THE HECTRCULATION PUMP HAS REPLACED BY

A SS GLOBE VALVE.  THERE WERE SOME MINOR PROBLEMS WITH THE PH AND LEVEL CONTROLLERS.


4TH OUARTER-1977   THF FAN ROTOR MAS STRENGTHENED AND ClEANED OF THF SCALING.  THE FAN BEARING

BURNED UP.  IT MAS REPLACED AND THE FAN WAS REALIGNED.


1ST OUARTER-197B    HIGH STACK DISCHARGE VELOCITY (60 FPS) CAUSED BY SMALL STACK  DIAMETER  AND POOR

LOCATION OF MIST ELIMINATOR (TOO CLOSE TO STACK TRANSITION SECTION)  RESULTED IN HIGH  ENTRAPMENT OF

DROPLETS.  THE STACK AND TOP SECTION OF THE SCRUBBER WERE REDESIGNED.


3ND QUABTER-1978    THE MFSH nEMISTER MAS REPLACED  BY A MUNTE&S CHEVRON TYPF M|ST ELIMINATOR.

A KOCH FLEXTTRAY MAS INSTALLED ABOVE THE 3RD TRAY IN ORDER TO IMPROVE  so? REMOVAL EFFICIENCY,

PARTICULARLY DURING TURNDOMN CONDITIONS.  THE PH  PROBES ARE  FOULED FREQUENTLY.  SEVERAL

TYPES OF CONTROLLERS ARE PRESENTLY BEING TESTED FOR HIGH RELIABILITY.  THE MILD STEEL RECIRCULATION

LINES MERF ERODED, AND MILL BE REPLACED BY  316L SS. THE AIR BUBBLER IN THE SODA  ASH  TANK  LEVEL

CONTROLLER IS OFTEN PLUGGED.   IT MILL BE REPLACED BY A DIAPHRAGM-TYPE  LEVEL CONTROL DEVICF.  THE

SLOWDOWN TANK OUTLET LINE  HAS DEVELOPED SCALING.  A POSITIVE DISPLACEMENT PUMP WAS TO BE  INSIALLFO

IN THIS LINE, AND  A SCALING INHIBITOR MAS POSSIBLY  TO BE ADDED  IN THE  TANK LIQUOR.



3RD OUARTFH-1978    THE SLOWDOWN TANK OUTLET LINE WAS REPLACED WITH  A  ONE-INCH LINE TO INCREASE

VELOCITY AND THUS  SOLVE THE SCALING PROBLEM.  NFw J16L SS RFCIRCUI.ATION LINES HAVE HEFN  INSTAL-

LED. AS HAS THE DIAPHRAGM-TYPE LF.VEL CONTROL IHVICE IN THE SODA ASH  TANK.  PM CONTROLLERS  ARE STILL

BEING TESTED.  A SCREW-TYPF POSITIVE DISPLACEMENT PUMP WAS INSTALLED,  REPLACING AN EARLIFR  PUMP

MHICH ERODED DUE TO HIGH RPM.  A SILICON OISPERSANT IS NOW BEING ADDED TO THE LIQUOR  TO  ASSIST  IN

ALLEVIATING THE SCALING PROBLEM, RUT THFBF  HAS NOT  BEEN SUFFICIENT TIMF TO FVALUATE ITS

EFFECTIVENESS.  SINCE  AUGUST 7 THE SYSTF" HAS EXPERIENCED ONLY ? HAYS  DOwNTTHF OIIF TO REPLACEMENT

OF FAN BEARINGS.

flTH (JHARTFR-197*   THF PIISITIVF DISPl ACf MFf< t  (M)YNO) PUMP, WHICH HA* A NATIWAl R1IRBEH STATOR AND



                                                78

-------
                                                                             STATUS TO JANUARY 1979




                                      SECTION  9 (CONTINUED)




             PERFORMANCE DESCRIPTION FOP OPERATIONAL F6n SYSTEMS ON INDUSTRIAL BOILERS




6ETTY OIL COMPANY I BAKERSFJELD, CALIFORNIA  (CONTINUED)






316L ROTOR HAS EXPERIENCED ABRASION ON THE  ROTOR.  EROSION  IS CAUSED BY THE ASH COLLECTED IN THE




SCRUBBER AND SCALING.  SEVERAL OTHER MATERIALS SUCH AS CHROME-ALLOY AND NI-HARD ARE BEING




REVIENED AS REPLACEMENTS.  THE BLEED-OFF STREAM FLOW IS CONTROLLED MANUALLY AS A FUNCTION OF ITS




SPECIFIC GRAVITY (SET Pflal.15).

-------
                                                                             STATUS  TO JANUARY  1979

                                      SECTION  a  (CONUNUFI))

             PERFORMANCE nf-SCRIPTTHN FOR OPERATIONAL FGrt SYSTFMS ON  INTHSTRIAL BOILF.RS
  INSTALLATION NAMF

  INSTALLATION LOCATION

  SOURCE  CHARACTERISTICS

  SOURCF  RATING



  NUMBER  OF SEPARATE FGO UNITS

  NUMBER  OF BOILERS BEING CONTROLLED

  SOURCE  CAPACITY
  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW /  RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  SO? REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
RFTTY OIL COMPANY

RAKF.PSFIELO. CALIFORNIA

OIL (1.IX SULFUR)

«95,000 SCFM (TPTAL-15 BOILERS)

5 FGD SYSTEMS, EACH TREATING 300,000 ACFM a 500 F

 5

85

215 *W (EODIVALENT)! 2250 MM BTU/HR (TOTAL-IS BOILERS)

EACH BOILEH RATED AT 02,000 LBS/HR STEAM

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM s  I EQUIVALENT  MN,
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  MODULE  SIZING.)

IN-HOUSE DESIGN

SODIUM CARBONATE SCRUBBING

RETROFIT

DECEMBER, 1978

OPERATIONAL

96Z (600 PPM S02 3 INLET)

SOX (55 LH/HR ASH a INLET)

NASTEMATER TREATMENT AND DISCHARGE TO TAILINGS POND

HOLDING POND FOR EVAPORATION.

9 GPM BLEF.OOFF TO A SLOWDOWN TANK.  THE SLOWDOWN IS EMPTIED

INTO A DISPOSAL POND ONCE A WEEK.

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND  INFORMATION

     GETTY OIL, COMPANY HAS AN OIL FIELD NEAR BAKERSFIELO, CALFORNIA,  HHICH  OCCUPIES  ABOUT  15  SQUARE

MILES.  THFRF ARE 136 STEAM GENERATORS; 100 WITH  A  HEAT  RATE  OF  50  MM  BTU/HR AND  36 tilTH  A  HEAT

RATE OF 20 MM BTU/HR.  THE FUEL USED  IS CRUDE OIL WITH  1.1X SULFUR  AND A  HEATING  VALUE  OF 6.0  MM

8TU/BBL.  STEAM IS DISTRIBUTED THROUGHOUT  THE OIL FIELD  BY INSULATED PIPELINES  AND  INJECTED INTO

THE OIL WELLS.  CONDENSATION OF THE STEAM  REDUCES THE VISCOSITY  OF  THE OIL,  WHICH FLOWS FREELY TO

THE SURFACE ALONG WITH THE WATER.  THE OIL  IS SEPARATED  FROM  WATER  BY  DECANTATION IN  SETTLING  TANKS,

AND P.URIFIED QY DISTILLATION IF REQUIRED.

     THE FLUE GASES  (200,000 ACFM  AT  500 F) FROM  NINE BOILERS (50 MM BTU/HR  EACH) ARE MANIFOLDED

INTO ONE ABSORBER (18 FT OIA X 33  FT  HIGH).  EACH ABSORBER HAS  3 FLEXITRAYS  AND ONE FLEXICHEVRON

OEMISTER SUPPLIED BY KOCH ENGINEERING.  THE OVFRAI.L DESIGN OF THE FGD  SYSTEMS,  HOWFVER, IS  PERFORM-

ED INH01ISE BY GETTY  OIL ENGINEERS.  THE PROCESS USED IS  SODIUM  CARBONATE  SCRUBBING.   THE  FLUE  GASES

ARE QUENCHED IN THf  BOTTOM PART OF THE  ABSORBER.  THE RFCIRCULATION LIQUOR PH IS  MAINTAINED BETWEEN

6.5-6.8 AND HAS IT PERCENT DISSOLVFD  ROLTDS RY WEIGHT.   THE DFSTGN  L/G RATIO TS 9 GM./1000  ACF *NO
                                                 80

-------
                                                                             STATUS TO JANUARY 1979
                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL FSO SYSTEMS ON INDUSTRIAL HUILPHS
SETTT OIL COMPANYl 8AKERSFIELO, CALIFORNIA (CONTINUED)

THE FLOW TO THE TOP TRAY IS ABOUT 1300 fiPM.  A BLEED-OFF STREAM OF 9 GP« IS CONTINUOUSLY SENT TD A
SLOWDOWN TANK, WHICH IS EMPTIED INTO A DISPOSAL PONtl ONCE A WEEK.  THF ABSORBER IS DESIGNED TO
REMOVE 96X OF 302 (600 PPM AT INLET) ANO ABOUT 50 PERCENT OF THE ASH (35 LB/HR *T INLET).
     REFER TO FIGURE 14-20 IN SECTION 14 FOR A DETAILED PROCESS FLO* DIAGRAM OF THIS SYSTEM.

                                        OPERATING HISTORY
3RD OUARTER-1978    OF THE 9 FGD SYSTEMS UNDER CONSTRUCTION, ONE MAS STARTED UP ON SEPT. 18. 1978
AND ANOTHER IS SCHEDULED FOR START-UP THE FIRST MEEK IN OCTOBER.   THE LAST OF THE SYSTEMS IS
SCHEDULED FOR START-UP 8Y MID FEBRUARY.

1TH OUARTER-1978   A TOTAL OF FIVE FGD SYSTEMS HAVE STARTED UP.  THE MAIN STARTUP PROBLEMS ANO THEIU
SOLUTIONS ARE:
I.  SCALING—THE STEAM CONOENSATE IS FILTERED, SOFTENED AND RECYCLED TO THE GENERATORS AND THE F60
SYSTEMS.  STILL, SOME OF THE DISSOLVED SPECIES SEEM TO CAUSE SCALING IN THE ABSORBERS NHEN
SUBJECTED TO A PH CHANGE.  SILICON OISPERSANTS HAVE BEEN USED TO REDUCE THE SCALING.
2.  FANS—MISALIGNMENT OF BEARINGS HAS BEEN A FREQUENT SOURCE OF HIGH VIBRATIONS.  ALL THE FANS ARE
FORWARD-CURVED-BLADE CENTIFU6AL TYPE, NITH A DESIGN RATING OF tt IN KG. AT 560 HP.  SOME OF THE
FANS, HOWEVER, HAVE NOT BEEN ABLE TO GENERATE THE SPECIFIED POSITIVE PRESSURE.  PROPER VENDOR
SELECTION MAY BE THE SOLUTION.
3.  MIST ELIMINATOR—IN ONE ABSORBER, THE FLEXI-CHEVRON MIST ELIMINATOR HAS ACHIEVED LO* DROPLET
REMOVAL.  THIS MAY BE DUE TO CHANNELING IN THE ABSORBER, ANO THE PROBLEM IS UNDER INVESTIGATION.
SOME OTHER CHEVRON MIST ELIMINATORS MAY BE EVALUATED.  OUT OF THE « REMAINING UNITS, 2 ARE SCHEDULED
TO START IN MID-JANUARY ANO 2 IN MID-FEBRUARY 1979.
    ONE FGO SYSTEM STARTEO-UP IN DECEMBER 1978 IS USING SODIUM HYDROXIDE SCRUBBING IN AN ATTEMPT TO
EVALUATE THE PERFORMANCE OF CAUSTIC AGAINST SODA ASH AS THE ALKALI.  THE SODA ASH CONSUMPTION HAS
BEEN VERY HIGH (2-2.2 L8/LB 302 REMOVED) COMPARED TO THE STOICHIOMETRIC REQUIREMENT (1.7 LB/LB 302
REMOVED, MAX.).
                                                81

-------
                                                                              STATUS  TO  JANUARY

                                      SECTION  S  (CONTINUFO)

             PERFORMANCE DESCRIPTION FOB OPERATIONAL FGO SYSTEMS ON  INDUSTRIAL  BOILFRS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING

  NUMBER OF SEPARATE ?GD UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  802 REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  MATER MAKF-UP

  SLUDGE OR BY-PRODUCT DISPOSAL



  CONTROL SYSTEM COST
GREAT SOUTHERN PAPER CO.

CFDAR SPRTNCS, GEORRIA

BARK,COAL/OIL Cl.OX - a.OX SULFUR)

020,000 SCFM (TOTAL - 2 BOILERS)

 2

 2

210 MH (EQUIVALENT)s TOTAL - 2 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERVlISE, ?000 SCFM = 1 EQUIVALENT  MW.
THIS IS HFCAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN "OOULE SIZING.)

AIRPOL INDUSTRIES

CAUSTIC WASTE STREAM

RETROFIT

1<»75

OPERATIONAL

85X-90X (1,000 PPM AT INLET)

ti.i% (DFSIGN: «.s GR/SCF AT INLET)

OPEN LOOP; 150 - 100 GPM PER ABSORBER

WASTEWATER TREATMENT AND DISCHARGE TO RTVER

CLARIFICATION FOLLOWED 3Y PONDING AND DISCHARGE TO RIVER

SEF SECTION 1J FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION

     IN CEDAR SPRINGS, GEORGIA, THE GREAT SOUTHERN PAPER COMPANY  OPERATES  TWO  500,000  LR/HB  BOILERS

GENERATING A TOTAL OF 700,000 ACFM AT 425 F.  THE  BOILERS  NORMALLY  RUN  AT  NEARLY  PEAK  CAPACITY  AND

FIRE BARK AND COAL (1.5X SULFUR).  A FUEL OIL BACK-UP  SYSTEM IS ALSO  AVAILABLE.

     EMISSIONS FROM THE TWO BOILERS ARE HANDLED BY TWO AIRPOL  VENTURI SCRUBBERS,  EACH  FOLLOWED  BY  A

RADIAL VANE SFPARATOR AND A STUB STACK.  PRESSURE  DROP ACROSS  THE SCRUBBER IS  ABOUT  ft  INCHES W.G.,

AND THE DESIGN S02 REMOVAL EFFICIENCY IS BS-90*.   IHfc  SCKUBBhRS OPERATE WITH AN L/G  RATIO  OF ABOUT 5

GAL/1000 ACF. THE INLFT S02 CONCENTRATION OF THE FLUE  GAS  IS TYPICALLY  1000-1200  PPM AND THE

PARTICULATE LOADING IS «.5 GR/SCFD.

     SCRUBBER UNDERFLOW, CONTAINING FLYASH  AND SODIUM  SULFATE, GOES TO  A COMMON STAINLESS  STEEL

RECIRCULATION TANK.  SOLIDS CONTENT IN THE  TANK IS 3-5X AND PH IS MAINTAINED AT 3.5-5  USING  A 5X

CAUSTIC WASTE STREAM FROM AN ONSITE OEMINFRALIZF.R.  A  BLEFO STREAM  OF ABOUT 600 GPM  IS PUMPFD TO  AN

ASH SETTLING POND.

     THE SCRUBBERS, SEPARATORS  AND STUB STACKS ARF ALL STAINLESS  STFEL. THF PIPING, HEC1RCULATION

PUMPS (3 AT 2300 6PM), AND ASH  PUMPS  (2 AT  500 GPM)  ARE RUBBER LINED.

    RFFFH TO FTRU»E >a-?2 IN SFCTION  la FflH A DETAILED PROCESS FLOH DIAGRAM OF THIS  SYSTFM.
                                                 82

-------
                                                                             STATUS TO JANUARY 1979
                                      SFCTION  1 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPFRATIONAL FGD SYSTEMS ON INDUSTRIAL RUTLfHS
6RE*T SOUTHERN PAPER CO.S CEDAR SPRINGS, GEORGIA (CONTINUED)

                                         OPERATING HISTORY
OTH OUARTER-1977    THE EXPANSION JOINT BETWEEN THE EXISTING STACK AND SCRUBBER HAD TO HE REPLACED
IN SEPTEMBER.  SOME INTERNAL WEAR WAS DETECTED ON THE PUMPS DUE TO ASH CONTENT.  EROSION AND PLUG-
GING PROBLEMS WITH THE PM PROBES HAVE BEEN ENCOUNTERED.  THE PLANT WAS IN PROCESS OF CHANGING THE
CONTROL PH AND MOVING TM£ PROBES.  TANKS AND NECESSARY EQUIPMENT TO CONTROL THE PROPER PH ARE
EXPECTED TO BE COMPLETED IN A COUPLE OF MONTHS.   OME EROSION HAS DETECTED IN THE RECTRCULATION
LINES Of THE POWER BOILER SCRUBBER.  THF LINES AND SOME OF THE VALVES HAD TO BE REPLACED.

1ST. 2ND, 3RD QUARTER-197B    GREATER PH CONTROL WAS ACHIEVED BY INSTALLING A CAUSTIC HOLD TANK AND
REGULATING THE FLOW FROM THAT TANK TO MAINTAIN A CONSTANT PH IN THE RECIRCUlATION TANK.  THE RUBBER-
LINED PIPING HAS ERODED AND IS GRADUALLY BEING REPLACED WITH STAINLESS STEEL.  THE VENTURI SCRUBBFR
AND SEPARATOR MERE INSPECTED FOR CORROSION AND FOUND TO BE IN GOOD CONDITION.

4TH QUARTER-1978    PROBLEMS HAVE BEEN EXPERIENCED WITH PACKINGS TN ALL THE PUMPS.  A MECHANICAL
SEAL WAS TRIED AND LASTED 3 WEEKS.  NEW SFALS WILL BE INSTALLED. AND SINCE THERE ARE BACK-UPS FOR
ALL THE POMPS IN THE SYSTEM, THIS SHOULD NOT CAUSE ANY DOWNTIME.  PLANS FOR 1979 INCLUDE UPGRADING
THE ASH HANDLING SYSTEM AND POSSIBLY INSTALLING A MIST ELIMINATOR IN THE TOP OF THE SEPARATOR.
THE SOLIDS CONTENT IB THE RECIRCULATEO LIBUOR WILL BE REDUCED BY INCREASING THE MAKE-UP WATER
INPUT AND THE BLEED-OFF RAT.E AT THE RECIHCUl ATION TANK.  ALSO, THE PRESENT BLFEO LINE AND ASH PUMPS
HILL BE REPLACED WITH A GRAVITY LINE.

-------
                                                                             STATUS  TO JANUARY  1979




                                       SECTION'   9  (CONTINUED)




             PERFORMANCE DtSCRlPriON  F0«  OPERATIONAL  FRH  SYSTEMS ON  INDUSTRIAL ROtLEKS
  INSTALLATION NAME




  INSTALLATION LOCATION




  SOURCE CHARACTERISTICS




  SOURCE SATING




  NUMBER OF SEPARATE FGD UNITS




  NUMBER OF BOILERS BFING CONTROLLED




  CONTROL SYSTEM VENDOR




  CONTROL PROCESS




  NEW / RETROFIT




  START-UP DATE




  CONTROL SYSTEM STATUS




  $m REMOVAL EFFICIENCY




  SLUDGE OR BY-PRODUCT DISPOSAL




  CONTROL SYSTEM COST
                      GREAT WESTERN



                      HILLINGS, MONTANA



                      COAL C0.7X SULFUR)



                      60.000 SCFM (TOTAL - S BOILERS)



                       3



                       3



                      GREAT WESTERN SUGAR



                      AMMONIA-LADEN PROCESS HATER



                      RETROFIT



                      OCTOBER, 1977



                      OPERATIONAL



                      35Z (300-400 PPM a INLET)



                      HASTEWATER TREATMENT ANO DISCHARGE TO RIVER



                      SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND  INFORMATION




    THE FGO SYSTEM AT GREAT WESTERN SUGAR, BILLINGS, MONTANA PLANT HAS BEEN PRIMARILY DESIGNED




FOR PARTICULATE CONTROL.  HOWEVER, THE SCRUBBING LIQUOR CONTAINS ENOUGH NH3 (PH=«.7) TO OBTAIN




A REMOVAL EFFICIENCY OF 35* FOR Sfii.  THE CONCENTRATION OF 302 AT THE INLET IS 300-400 PPW.




THE SYSTEM CONSISTS OF A VARIABLE THROAT VENTURI SCRUBBER AND A SINGLE STAGE, THREE PASS CHEVRON




DEMISTER.  THE SCRUBBER WAS INSTALLED IN OCTOBER, i977 AND HAS BEEN OPERATING SATISFACTORILY.




    THE SCRUBBER EFFLUENT IS 8LEO OFF TO A POND WHERE IT IS BLENDED ANO COOLED KITH OTHER PROCESS




WASTE STREAMS AND THEN PUMPED TO A RIVER.
3RD QUARTER-1978
                    OPERATING HISTORY




NO INFORMATION WAS REPORTED FOR THIS UPDATE PERIOD.

-------
                                                                              STATUS  TO  JANUARY  1979

                                       SECTION   9  (CONTINUED)

             PERFORMANCE DESCRIPTION  FOR  OPERATIONAL  FGfi  SYSTFMS  ON  INDUSTRIAL ROILEWS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING
  NUMBER OF SEPARATE FRO UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  802 REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  SLUDGE OR BV-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
GREAT WESTERN SUGAR

FORT MORGAN, COLORADO

COAL (1.21 SULFUR, AVERAGE)

65,230 SCFM (TOTAL - 2 BOILERS)

100,000 ACFM FACH 3 aOO F (TOTAL - ? BOILERS)

350,000 LBS/MR STEAM (TOTAL - 2 BOILERS)
326 MM BTU/HR, 32 MW (EQUIVALENT) » TOTAL - 2 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHFRWISE. 2000 SCFM = 1  EQUIVALENT M«.
THIS IS BECAUSE GAS FLO* RATE IS THE PRIMARY FACTOR IN MODULE STZING.)

GREAT WESTERN SUGAR

AMMONIA-LADEN PROCESS MATER

RETROFIT

OCTOBER, 1976

OPERATIONAL

OSX (300-«00 PPM 3 INLET)

95X (730 LBS/HR a INLET)

HASTENATER TREATMENT AND DISCHARGE TO RIVER

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION

    THE GREAT WESTERN SUGAK COMPANY  HAS  TWO COAL FIRED  BOILERS AT  THEIR FORT MORGAN, COLORADO PLANT.

EACH BOILER is RATED AT 125,000 LBS/HR OF STEAHJ AND BURNS COAL WITH o.si PERCENT AVERAGE SULFUR,

8.7 PERCENT AVERAGE ASH, AND AN AVERAGE  HEATING VALUE OF  10,176 BTU/LB.  THE SUGAR FACTORY IS OPER-

ATIONAL ONLY 3 MONTHS OF EVERY YEAR, DURING THE FALL QUARTER.

    THE FGO SYSTEM HAS RETROFITTED IN OCTOBER i"J76 AS A PROPRIETARY DESIGN PRIMARILY FOR PARTICULATE

CONTROL.  THF FLUE GASES FROM EACH BOILER (100,000 ACFM a flOO F) PASS THROUGH MULTICLONES, AND THEN

ARE SENT THROUGH A VENTURI SCRUBBERi WHICH OPERATES WITH A PRESSURE DROP OF 6 IN. *.G. AND L/G

VALUE OF 8 RAL/1000 ACF.  THE SCRUBBERS  ARE FOLLOWED BY A COMMON VESSEL WHICH CONTAINS A SINGLE-

STAGE, THREF.-PASS CHEVRON MIST ELIMINATOR (M-E).  WASH WATER FLOW  TO THE M-E IS 120 6PM, WITH A

FREQUENCY OF 15 MINUTES EVERY 8 HOURS.   THE PRESSURE DROP ACROSS THE M-E IS 0.5 IN. n.G.  A CONSTANT

BLEEO-OFF STREAM OF 800 GPM FROM EACH SCRUBBER IS SF.NT TO A POND,  WHICH OVERFLOWS INTO ANOTHER

HOLDING POND.

    THE VENTURI SCRUBBER, THE PLUG, M-E  VESSEL, AND THE M-E ARE ALL MADF OF 316L SS.

    REFER TO FIRURE i«-as IN SECTION ia  FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.
                                                85

-------
                                                                             STATUS TO JANUARY 1979

                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPFRAHONAI FGO SYSTEMS ON INDUSTRIAL ROILFHS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE  CHARACTERISTICS

  SOURCE  RATING
  NUMBER  OF SEPARATE FGO UNITS

  NUMBER  OF BOILERS BEING CONTROLLED

  SOURCE  CAPACITY
  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEK  / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  502  REMOVAL EFFICIENCY

  SLUDGE OR BY-PRODUCT DISPOSAL



  CONTROL SYSTEM COST
GREAT ttESTERN SUGAR

GERING, NFBRASKA

COAL (1.2% SULFUR, AVERAGE)

110,000 SCFM (TOTAL - 2 BOILERS)

97,000 ACFM EACH 9 «50 F (TOTAL - i BOILERS)

205,000 LBS/HR STEAM (TOTAL - 2 BOILERS)
21 Mh (EQUIVALENT) j TOTAL - 2 BOILERS

218 MM BTU/HR (TOTAL)

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EWIIVALtNT  Mil,
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE  SIZING.)

GREAT WESTERN SUGAR

AMMONIA-LADEN PROCESS WATER

RETROFIT

OCTOBER, 1975

OPERATIONAL

701 (600 PPM a INLET)

WASTEWATER TREATMENT AND DISCHARGE TO RIVER

EFFLUENT TO HOLDING POND

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

    THE GREAT WESTERN SUGAR COMPANY HAS TWO COAL-FIREO BOILERS AT THEIR GERING, NEBRASKA PLANT.

BOILER *1 IS RATED AT 150,000 LBS/HR OF STEAM AND WAS SUPPLIED BY ERIF CITY IN 1965.  BOILER

»2 IS HATED AT 55,000 Lfl/HR OF STEAM AND HAS SUPPLIED BY ERIE CITY TN  195«.  THE COAL HAS 0.73

PERCENT AVERAGE SULFUR, 8.5 PERCENT AVERAGE ASH, AND AN AVERAGE HEATING VALUE OF 10,180 BTU/LB.

THE SUGAR FACTORY IS OPERATIONAL ONLY 3 MONTHS OF EVERY YEAR, DURING THE FALL OUARTFR.

    THE FGO SYSTEM WAS RETROFITTED IN OCTOBER 1975 AS A PROPRIETARY DESIGN PRIMARILY FOR PARTICIPATE

CONTROL.  THE FLUE GASES FROM TWO BOILERS  (105,000 ACFM 3 310 F) PASS  THROUGH CYCLONES, ARE MIXED  IN

A COMMON DUCT, AND THEN SENT THROUGH TWO VENTURT SCRUBBERS  (EACH HEATING 97,000 ACFM 3 4SO F),

WHICH OPERATF WITH A PRESSURE DROP OF 6 IN. rt.G. AND L/G VALUE OF 6.2  GAL/ACF.  THE OPERATING GAS

VELOCITY AT THE VENTURI INLET IS «3 FPS.   THE SCRUBBERS ARE FOLLOWED BY A MIST ELIMINATOR (M-E)

VESSEL WHICH CONTAINS A SINGLE-STAGE, THREE-PASS CHEVRON M-E.  WASH WATER FLOW TO THE M-E IS ISO

GPM, WITH A FREOUENCY OF 15 MINUTES FVERY  B HOURS. THF PRESSURE DROP ACROSS THE M-E IS 0.5 IN. W.G.

THE SCRUBBER EFFLUENT, 700 GPM FROM EACH SCRUBBER, IS SENT  TO A POND.

    THE VENTURI SCRUBBERS, VARIABLE DIAMETER PIU6S, M-E VFSSFL, AND M-E ARE ALL MADE  (IF 30«L S3.

HEFFR TO FIGURE l«-*7 FOR A flFTAII.EO PRnrFSS FLU* DIAGRAM OF THIS SYSTEM.

-------
                                                                              STATUS  TO JANUARY  1979
                                       SECTION   9  (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SY3TFMS ON  INDUSTRIAL ROILFRS
  INSTALLATION NAME
  INSTALLATION LOCATION
 "SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBER OF SEPARATE F61 UNITS
  NUMBER OF BOILERS BEIN6 CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NED / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  S02 REMOVAL EFFICIENCY
  SLUD6E OB BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
GREAT WESTERN- SUGAR
GREFLEY, COLORADO
COAL (0.61 SULFUR)
25,000 SCFM CI  BOILER)
 1
 1
12 MW (EQUIVALENT)
(FOR THIS REPORT, UNLESS STATED OTHERWISE. 2000 SCFM = I EQUIVALENT MW,
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTflH tN MODULE SIZING.)
GREAT WESTERN SUGAR
AMMONIA-LADEN PROCESS WATER
RETROFIT
OCTOBER, 1975
OPERATIONAL
35* (300-flOO PPM 9 INLET)
WASTEWATER TREATMENT AND DISCHARGE TO RIVER
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND  INFORMATION
    AT THE GREELY, COLORADO PLANT, GREAT WESTERN SUGAR HAS IN OPERATION 6 COAL FIRED BOILERS
MANUFACTURED BY STERING AND PLACED IN SERVICE  IN 1920.  THE BOILERS OPERATE 2796 HOURS PER YEAR
DURIN6 THE FALL AND EARLY WINTER MONTHS.  EACH BOILER POSSESSES THE FOLLOWING CHARACTERISTICS:
AN OPERATING HEAT INPUT OF 29.7 MM BTU/HR, A DESIGN STEAM CAPACITY OF  12,225 LB/HR AND A DESIGN
FLUE GAS FLOW RATE OF 26,333 ACFM 3 550 f.  THE COAL USED AS FUEL HAS  AN AVERAGE HEATING VALUE
OF 9208 8TU/LB, AN AVERAGE SULFUR CONTENT OF 0.66X  AND AN AVERAGE ASH  CONTENT OF 5.39X.
    THE SCRUBBER SYSTEM IS A WET VENTURI FOLLOWED BY A CHEVRON TYPE, ONE PASS MIST ELIHINATOK.
THE MIST ELIMINATOR is CONSTRUCTED OF s/16" 316 STAINLESS STEEL AND THE SCRUBBER is CONSTRUCTED
OF 10 6A. 316L S3.  OcMISTER WASH FLOW PATE IS 120  GPM.  DESIGN FLUE GAS FLOW RATE IS lfea.000
ACFM 3 550 F AND THE L/G RATIO IS 5.5 GAL/1000 CFM.   THE FLOW OF SCRUBBING LIQUOR TO THE VENTURI
IS 550 GPM.  THE PRESSURE DROP ACROSS THE SCRUBBER  IS 7" WG.
    THE WASTE WATER FROM THE SCRUBBER IS AN ASH/WATER SLURRY WHICH IS  CONTINUOUSLY DISCHARGED
TO A POND AT 1100 GPM.
    REFER TO FIGURE l«-28 IN SECTION la FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.
                                        OPERATING HISTORY
3RD QUARTER-197B   NO INFORMATION WAS REPORTED FOR THIS REPORT PERIOD.

-------
                                                                               STATUS  TO  JANUAWY 1<)70  LRS/HR OF STEAM AND BURNS COAL WITH O.S? PERCENT  AVERAGE  SULFUR.
9.4 PERCENT AVERAGE ASM.  AND AN  AVERAGE HEATING VALUE OF 10.305 8TIJ/LB.  THE 3UGAR FACTORY IS OPER-
ATIONAL ONLY J MONTHS  OF  EVERY YEAR.  DURING THE FALL BUARTER.
    THE FGD SYSTEM IKAS RETROFITTFn  IN OCTOBER 19,71 AS .A PROPRIETARY DESIGN PRIMARILY  FOR  PARTICULATE
CBNT«r»u.  TKE FLUE GASES  FROM EACH  BOILER (100^000, ACFM i mo F) PASS FMROUGH C»CLONES  AND AHE MIKED
IN A COMMON DUCT, ANO  THEN SENT  THROUGH TWO VENTURI SCRUBBERS, WHICH OPERATE WITH  A PRESSURE  DROP
OF 7 IN. w.fi. AND L/G  VALUE  OF 7.5  GAL/1000 ACF.  THE OPERATING GAS VELpCI.T.t AT- THE VENTURI INLET
IS 45 FPS.  THE SCRUBBERS ARE FOLLOWED flf * "1ST ELItMNftTGK (M-E) VESSEL WHICH CONTAINS A ONE-PASS,
THREE-STAGE CHEVRON M-E.  WASH MATER  FLOfe TO THE M-E IS 120 GPM, KITH A FREQUENCY  OF  IS MINUTES
EVERT 5 HOURS.  THE PRESSURE 0«OP ACROSS THE M-E IS 0.5 IN. W.G.  THE EFFLUENT STREAM FROM EACH
SCRUBBER. 750 GPM. IS  SENT TO A  POND, WHICH OVERFLOWS INTO ANOTHER HOLDING PONn.
    THE VENTURI SCRUBBERS. VARIABLE  DIAMETER PLUGS. M-E VESSEL. AMD THE M-E ARE .ALL MADE
OF 316L SS.
    RF.FFR TO flfillRF \Q-?1 IN SECTION  la f fif t. OETAILEP PWC1CFSS FL1H ItTAGfl*** OF THIS SYSTF.M. -

-------
                                                                              STATUS TO JANUARY

                                       SECTION  «> (CONTINUED)

             PERFORMANCE  ntSCRIPTTON FOP OPERATIONAL  FCr SYSTFMS  0* INMl'STWl M  HIlTLFWS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING
  NUMBER OF SEPARATE FGO  UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY
  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  SOa REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  SLUD6E OR BY-PRODUCT DISPOSAL



  CONTROL SYSTEM COST
GREAT WESTfRN SUGAR

SCOTTS (HUFF, NEBRASKA

COAL (1.2* SULFUR, AVERAGE)

65»230  SCFM (TOTAL - Z BOILERS)

130,000 ACFV EACH 9 «00 F (TOTAL - I BOILERS)

300,000 LBS/HR STEAM (TOTAL - Z BOILERS)
32 MW (EQUIVALENT); TOTAL Z - BOILERS

315 MM RTU/HR (TOTAL)

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EOUIVALENT MW.
THIS IS BECAUSE GAS FLOM RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

GREAT WESTERN SUGAR

AMMONIA-LAOEN PROCESS WATER

RETROFIT

OCTOBER, 1975

OPERATIONAL

35* (400 PPM a INLET)

<>5%

MASTEMATER TREATMENT AND DISCHARGE TO RIVER

EFFLUENT STREAM TO HOLDING POND.

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND  INFORMATION

    THE GREAT WESTERN SUGAR COMPANY  HAS TWO  COAL-FIRED  BOILERS  AT  THEIR  SCOTTS  BLUFF,  NEBRASKA

PLANT.  EACH BOILER IS RATED  AT  ISO,000 LBS/HR  OF  STEAM AND  BURNS  COAL WITH  0.61  PERCENT  AVERAGE

SULFUR, 5.2 PERCENT AVERAGE ASH,  AND  AN AVERAGE  HEATING VALUE OF v,300 BTU/LB.  THE SUGAR FACTORY  IS

OPERATIONAL ONLY 3 MONTHS OF  EVERY YEAR, DURING  THE FALL QUARTER.

    THE F60 SYSTEM WAS RETROFITTED IN OCTOBER 1<»75 AS A PROPRIETARY  DESIGN PRIMARILY FOR  PARTICULATE

CONTROL.  THE FLUE GASES FROM TWO BOILERS  C130.000 ACFM EACH 3  «00 F) PASS THROUGH CYCLONES AND ARE

MIXED, AND THEN SENT THROUGH  THO  VENTURI SCRUBBERS, WHICH OPERATE  WITH A PRESSURE DROP OF 6 IN.

W.G. AND L/G VALUE OF 6.5 GAL/1000 ACF.  THE OPERATING  GAS VELOCITY  AT THE VENTURI INLET  IS 56 FPS.

THE SCRUBBERS ARE FOLLOWED BY A DEMISTER VESSEL  WHICH CONTAINS  A SINGLE-STAGE,  THREE-PASS CHEVRON

"1ST ELIMINATOR (M-E).  WASH  WATER FLOW  TO THE M-E IS 150 6PM,  WITH  A FREQUENCY OF 10 MINUTES EVERY

« HOURS.  THE PRESSURE DROP ACROSS THE  M-E IS 0.5  IN. n.G.   THE SCRUBBER FFFLUENT, flaS GPM FROw EACH

SCRUBBER, IS SENT TO A POND.

    THE VENTURI SCRUBBERSt VARIABLE DIAMETER PLUGS, M-E VESSEL, AND  THE M-E  ARE ALL MADE  OF 316L S3.

REFER TO FIGURE l«-30 IN SECTION  14 FOR  A DETAILED PROCESS FLOW OF THIS SYSTEM.

-------
                                                                              STATUS  TO  JANUARY  1971
                                      SECTION  1 (CONTJNUFn)

             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTFMS ON  INOMSTRIAt BOILEHS
  INSTALLATTON NAME

  INSTALLATION LOCATION

  SOURCE  CHARACTERISTICS

  SOURCE  RATING

  NUMBER  OF SEPARATE FGO UNITS

  NUMBER  OF BOILERS BEING CONTROLLED

  SOURCE  CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  803 REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  HATER MAKE-UP

  SLUDGE  OR BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
ITT RAYONIF.R, INC.

FERNANOINA BEACH, FLORIDA

BARK,OIL (2.OX - 2.5X SULFUR)

176,000 SCFM (TOTAL - fl BOILERS)

 2

 a

88 MW (EQUIVALENT); TOTAL - 0 BOILERS

(FOR THIS REPORT, UNLFSS STATED OTHERWISE, ?000 SCFM s  1 FQIUVALENT  M*.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  HOOULE  SIZING.)

AIRPOL INDUSTRIES

SODIUM HYDROXIDE SCRUBBING

RETROFIT

1975

OPERATIONAL

BOX - 85* (1,200 PPM AT INLET)

971 (1.7 GR/SCF AT INLET)

OPEN LOOP

WASTEWATER TREATMENT AND DISCHARGE TO TAILINGS POND

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

    ITT RAYONTEP OPERATES AN AMMONIA-BASED SULFITE PULP MILL IN FERNANDINA  BEACH,  FLORIDA.   THERF

ARE FOUR PROCESS STEAM BOILERS TYPICALLY OPERATING AT APPROXIMATELY  80  TO SOX  LOAD.   TWO ARF. RATED

AT 125,000 LB/HR STEAM, ONE AT 100,000 LB/HR STEAM AND ONF  AT  150,000 LB/HR STEAM.  ALL ARE RATED  AT

600 PSI6.  THE FOUR BOILERS OPERATE IN THF FOLLOWING MANNER:

              NO. 1 - 100,000 LB/HR STEAM - FIRES FUEL OIL  (NO. 6)

              NO. 2 - 125,000 LB/HR STEAM - FIRES A COMBINATION OF BARK AND NO.  6  FUEL OIL

              NO. 3 - SAME AS NO. 2

              NO. fl - 150,000 LB/HR STEAM - HRES FUEL OIL  (NO. 6)

    FLUE GASES LEAVING THE NUMBER TWO AND THREf BOILFRS ENTER  INTO SEPARATE MECHANICAL COLLECTORS

(BUELL CYCLONE COLLECTORS) FOR PARTICULATF HfMOVAl OF ABOUT 97%  (1.7 GR/SCF a)  INLET).  Two  IDENTICAL

FGO SYSTEMS ARE USED TO REMOVE 80 TO 85 PERCENT OF THE SO?  FROM THE  GAS FROM ALL FOUR BOILERS.

BOILERS ONE AND TWO ARF MANIFOLDED  INTO ONE SCRUBBER SYSTFM DESIGNED FOR 165,000 ACFM AT 060 F WHILE

GASES FROM THREF AND FOUR ARE MANIFOLDED  INTO  THE SFCOND  SCRUBHER SYSTEM DESIGNED  FOR 140,000 ACFM

»T 160 F.  EACH SYSTEM USFS A VARIABLE-THROAT  VF.NTUHI SCRIIBBEW FOR 802  REMOVAL WHICH IS PRECEEOED  BY

AN I.D. FAN.  THE PRESSURE DROP  ACROSS THF VENTURI VARIES BETWEEN  15 AND gg INCHES WG.  A 10X CAUS-

TIC SOLUTION  IS INJFCTfD  AT TH(=  THROAT OF THE  VF.NTUR1 BY  A  75  HP PIIMPCFULL  LOAD).   THF CAUSTIC IS

EITHER 08TATNFI) FRO" THF  "!OOI>  STARt HF  THFIR PII|,H HLFACHING  OPERATION OR  PUPtHASfD.  USUALLY PIlB-
                                                 90

-------
                                                                              STATUS TO JAMIAWt 1979



                                       SECTION  9 (CONTINUED)




             PERFORMANCE DESCRIPTION  FOR  OPFKAIIflNAL  Fl,l> STSTFnS nN IMtilSTRTAI  ROTl FRS




ITT RAYONIER, INC.» FERNANDtNA  BEACH,  FLORIDA (CONTINUED)






CHASED CAUSTIC IS USED  AND  THE  CAUSTIC FROM THE  BLF»CH|NU  OPERATION IS SOI D TO KRAFT MILLS.




CONTROL PH IS IN THF RANGE  OF 5.5  TO  6.0.  THE LIOUIO-SAS  MIXTURE ENTERS 4 SEPARATOR (J8 FT HIGH X




16.5 FT DIA.) WHICH INCORPORATES SPIN VANFS FOR  LIQUID  SEPARATION.  THE LTOHtD DROPS TO THE BOTTOM




OF THE SEPARATOR INTO THE RECIRCULATION TANK.  THE  RASES LEAVE THF TOP OF THE SEPARATOR AND LFAD




DIRECTLY TO THE STACK,  EXITING  AT  A  TEMPERATURE  OF  APPROXIMATELY t35 F.




    THE VENTURIS, SEPARATORS  (INCLUDING SPIN VANES),  SPENT LIQUOR PIPING AND HOLD TANKS »R£ ALL




CONSTRUCTED OF 316L SS.




    REFER TO FIGURE i«-3i IN  SECTION  i« FDR A DETAILED  PROCESS FLOW DIAGRAM OF THIS SYSTEM.









                                           OPERATING HISTORY




4TH OUARTER-1<»77    PLANT REPORTED THAT BOILERS  NO. Z AND  3 HERE OPERATING AT REDUCED LOADS,




EACH IN THE RANGE OF 75,000 - 90,000  LBS/HR STEAM.   THE SPENT CAUSTIC WAS NOT BEING




USED FOR SCRUBBING LIQUOR.  ITT WAS  SELLING THE  SPENT CAUSTIC TO KRAFT MILLS WHO USE IT




FOR THEIR SODA BASE.  CONDENSATE STEAM WAS BEING RECYCLED  AND USED FOR SCRUBBING PURPOSES.




SOME EROSION HAS BEEN NOTED AT  THE VENTURI THROAT.






ZH6 OUARTER-1«J78   THE  PLANT  WAS STILL UTILIZING CONOENSATE nATER FOR SCRUBBER LIOUOK.  APPROX-




IMATELY 3 TONS PER DAY  OF SODIUM HYDROXIDE WAS BEING  USED  TO MAINTAIN PH.  THE ORIGINAL HOT WASTE




STREAM CAUSTIC WAS NOT  USED FOR SCRUBBER  PURPOSES,  DUE  Tj)  PROCESS-RELATED PROBLFMS THAT OCCURRED.




SCRUBBER EFFLUENT WAS STILL BEING  SOLO TO KRAFT  MILLS.   THE SYSTEM HAS TWO SCRUBBERS, 'A' AMD '8'.




A-MODULE HAS DOWN « WEEKS IN  JUNE  AND JULY BECAUSE  OF AN F.n. FAN FAILURE, BELIEVED TO BE A RESULT




OF POORLY OPERATED MECHANICAL COLLECTORS.  NEW MECHANICALS WERF BEING INSTALLED TO PRFVFNT FURTHER




ABRASION.  THE PLANT REPORTF.O THAT SINCE  JANUARY, SCRUBBER OPERABILITY HAD BEEN APPROXIMATELY 95*.









3RD OUARTER-1978    THE BOILER  AND FGO SYSTEM OPERATED  APPROXIMATELY 95* OF THE PERIOtt.  THE




ONLY OUTAGE DURING THE  PERIOD "AS  BOlLER-RELATf0 AND  LASTED THREE DAYS.  THF BEARINRS IN THE 1.0.




FAN HAD TO BE REPLACED.








«TH OUARTER-1978    THE FGO SYSTEM DEMONSTRATED  AN  FSTIMATED <»St RELIABILI1Y.  A CRACKED FiN FOUNDA-




TION ON MODULE A CAUSED THAT MODULE TO BE NON-OPERARLE  FOR 10 DAYS.  I-BEAM? WERE PLACFD UNDER THF




FOUNDATION TO RESTORE SUPPORT.  AT THE SAME tiff, NEH SFALS WFHE PLACED IN THF OUST COLLECTOR TO




SLOW DOWN THE SEVERE EROSION PROBLEMS ON  THF  FAN.  THE  FAN SHROUD HAS BEEN REBUILT SEVERAL TIMES;




THIS IS THE SECOND FAN.  THE PLANT PLANS  TO INSTALl NEW DUST  COLLECTORS SOMFTIMF IN APRIL.  UNTIL




THEN, INTERMITTENT DOWNTIME IS  FXPfrCTEO.
                                                 91

-------
                                                                              STATUS  TO  JANUARY  1979

                                      SFCTint.  9  (cni"T IMUFD)
                         OESCR1PUHN FOR fiHEKAlIolVAI. Ffin SYSTFfS  ON  INDUSTP1AI  HOILFWS
  INSTALLATION NAMF
  INSTALLATION LOCATION
  SOURCF  CHARACTERISTICS
  SOURCE  RATING

  NUMBER  OF SEPARATF FGO UMTS
  NUMBER  OF BOILERS BFING CONTROLLED
  SOURCE  CAPACITY
  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW /  RETROFIT
  START-UP DATE
  CONTROL SYSTFH STATUS
  308 REMOVAL EFFICIENCY
  PAHTICULATE REMOVAL EFFICIENCY
  MATER  MAKF-tlP


  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
           rHF'TCAL CORP.
IRliNA, CALIFORNIA
COKF/CIIAL/OTL 10. 5X - 5.0* SULFUR)
a90,000 Sr.FM (TOTAL - ? BOILERS)
7?«i,ooo APFM 3 S20 F (TOTAL - 2 BOILERS)
 2
 f
235 I»M (bfl MA ELECTRIC POWER. ANO THE BALANCE IS PROCESS
STfAK) TflTAL - 3 BOILERS
(FOR THIS RFPORT, UNLESS STATED OTHERWISE, 2000 SCFH =  I EQUIVALENT  M».
THIS IS HFCAUSE GAS FLON RATE IS THE PRIMARY FACTOR IN  MOOilLE SIZING.)
COMBUSTION EQUIPMENT ASSOC.
SODIUM CARBONATE SCRUBBING
NEW
JUNE, 197R
OPERATIONAL
98*1 (AT MAXIMUM LOADING)
98. 5X (COLLECTED BY PRECEDING ESP'S)
OPEN LOOP: 125 GPM BURKITE SCRUBBING LIQUOR (a7t NA2C03 AND
HOLDING POND FOR EVAPORATION
SCRUBBER FFFLUENT IS CLARIFIED AND THEN PUT INTO A MINERAL
DEPOSIT.
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION
    KERR-MCGEE CHEMICAL CORP. HAS A NEW  1.3 MM  TON/YR SODA  ASH PLANT  AT  TRONA,  CALIFORNIA.   THE
PLANT, LOCATED ALONB THF SHORE OF SEARLFS LAKE,  IS  THF LARGFST YET  BUILT TO  YIELD  SODA  ASH  BY  DIRECT
CARBONATION OF BRINF ANO WAS COMMISSIONED IN  JUNE  1<)78.   THF PROCESSING  INNOVATIONS,  WHICH
HAVE IMPROVFD THE PLANT EFFICIENCY, INCLUDE CARBONATION  UNDER  13.5  PSI PRESSURE, USE  OF  A COAL-
FIRED POWFR PLANT, AND RECOVERY OF CO? FHOM THF  FLUF GASES.
   THE PLANT HAS TWO BOILERS, tACH PRODUCING  600,000 LB/HR  STEAM  AT 1500 PSI.   THE STEAM IS INITIAL-
LY USED TO DRIVE TWO 32 MW NON-CONDENSING STEAM TURBINES FOR ELECTRIC POWER,  THEN  IS  USED AS PROCESS
STEAM.  THE TOTAL MW EOIIIVALENT IS ABOUT ?«5  Mh.  EACH BOILER  BURNS A MIXTURE  OF WESTERN COAL
(0.7 PERCENT SULFUR) AND PETROLEUM tfmE  (5.5  PFRCENT SULFUh).  THE  HIGH  SULFUR  COKE IS  MIXED WITH
THE COAL IN ORDER TO IMPROVE THF PARTIAL IONI7ATION ANO  THEREFORE IMPROVE FLY-ASH  COLLECTION IN  THE
ESP WHICH OPFRATES ON  THf COLO SIDE OF THE PRFHEATER AT  9H.5 PERCENT  EFFICIFNCY AND 300 F.   THE  FLUE
GAS FLOW PATl- FROM FACH BOILER IS 3**,00t. ACFM  Al  ?2u F  AND MAY CONTAIN  SOZ  BFThEFN 335 TO  59B5  PPM
                                                 92

-------
                                                                              STATUS TO JANUARY 1979




                                       SECTION   9  (CONTINUED)




             PERFORMANCE DESCRIPTION  FUR  (IPFWftllUfcAl  FRU RrSTFr-iS nN INniiSTwtAl  RtllLFHS




KERR-MCGEE CHEMICAL CORP.; TRONA,  CALIFORNIA  (CONTINUED)






DEPENDING UPON THE FUEL.   THE  AIH  POLLUTION REGULATIONS  DICTATE  THAT  EACH BOILER "AY RELEASE  NOT




MORE TH*N 10 LBS/HH PAHTICULATE, 200  LH3/HR OF  SO?  AND  1 
-------
                                                                               STATUS  TO  JANIllfRY  1979




                                       SECTION  9 (CONTINUFD)




             PERFORMANCE  DESCRIPTION FOR OPERATIONAL Pen SYSTFMS ON JNOUSTRIAI HOILEHS




KERR-MC6EE CHFMICAL CORP.;  TRONA,  CALIFORNFA (CONTINUED)






LIQUID AS REPORTED  IN  THE 2ND  QUARTER 1978, BUT JNSTfAO rtAS A PROBLEM WITH  TRAY  TIEDOhN.




THE HOLFS PUNCHED IN THE  TRAYS WERE IINDERSI7EO AND THE PUNCHING HAS NOT CLEAN CUT; RAGCEO  LOliSF




FIBERS WERE LEFT AROUND  IHE PERIMFTER OF THF HOLE.  THIS QUARTER, THE BOILERS BIWNEO  *  "IXTI'BF  OF




COAL *ND COKE.  THE COAL  "AS RATED AT 10,000 BTU/LB AND 0.5* SULFUR,  THE COKE MAS KATFO AT  13,1110




BTU/LB AND 3.5% SULFUR.   A  NET SULFUR CONTENT OF 1.5* IS DESIRfcD.  ONE BOILFR WAS !>OwN  FOR 30 DA*S,




BUT HAS NOT A RESULT OF SCRUBBER PROBIEMS.   ROTH SCRUBBFRS DEMONSTRATED 1001 RELIABILITY.
                                                 9fl

-------
                                                                              STATUS  Tf  JANUARY  1979

                                      SFCTION   9  (CONTINUED)

             PERFORMANCE DESCRIPTION FOB OPERATIONAL  FGP  SYSTEMS  If!  INDUSTRIAL  RDTLFHS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING

  NUMBER OF SEPARATE FGO UNITS

  NUMBER OF BOILERS BEIN6 CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  S02 REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
HEAD PAPERBOARO CO.

STEVENSON, ALAHAMA

OTL (1.5X - 31 SULFUK)

100,000 SCFM (TOTAL   2 BOILERS)

 1

 i

50 MW (EQUIVALENT); TOTAL - 2 BOILERS

(FOR THIS RFPORT, UNLESS STATED OTHERWISE, 3000 SCFM =  1 EQUIVALENT  MW.
THIS IS BECAUSE GAS FLOW RATE IS THF PRIMARY FACTOR IW  MODULE SIZINB.)

AIRPOL INDUSTRIES

SODIUM CARBONATE SCRUBBING

NEW

1975

OPERATIONAL

95X (1,500 PPM 9 INLET)

90%

ALKALINE SIILFITF/BISULFTTE RECYCLED TO PULP PROCESS

RECOVERED SOLUTION USED AS MAKE-UP TO COOKING LI3UOR IN PULP

MILL.

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION

     THE MEAD PAPERBOARD COMPANY IN STEVENSON,  ALABAMA,  IS  A NEUTRAL  SULFTTE  PULP  MILL  MTH A  500

TON/DAY  PULP PRODUCTION RATE.  THE MILL HAS A CHEMICAL RECOVERY  SYSTEM  THAT ABSORBS  S02 FROM THE

BILLERUD REACTOR.  EFFLUENT FROM THE RECOVERY SYSTEM FLOWS  BACK  TO  THE  PULPING  OPERATION.

   ELSEWHERE ON-SITE, AN AIRPOL INDUSTRIES ABSORBER TOWER CONTROLS  PARTtCULATF  AND S02  EMISSIONS

FROM TNO OIL-FIRED (1.5X - 3.OX SULFUR) COMBUSTION-ENGINEERING PACKAGE  BOILERS  EACH  PRODUCING

175,000  LB/HR STEAM AT 600 PSI.  THE BOILERS ARE TYPICALLY  OPERATED AT  ROX OF MAXIMUM LOAD. FLUE

SAS VOLUME INTO THE SCRUBBER IS 173,000 ACFM a  050 F.  HOT  GASES PASS THROUGH A STAINLESS  STEEL

VENTURI/OUENCH SECTION FOR COOLING AND TMTTAI   S02 REMOVAL.  THF FLUE GAS THEN  ENTERS THE  BOTTOM  OF

THE ARSOR8ER SECTION AND PASSES UP THROUGH THREE BURBLE-CAP TRAYS.  A SODIUM CARBONATE  SOLUTION IS

INTRODUCED THROUGH A BANK OF FIGHT, 1.5-INCH NOZZLES CONSTRUCTED OF 316L SS AND SPIN VANES. THE

SOLUTION IS ADDED TO THE RECIRCULATION I!«E ON  THE SUCTION  SIDE OF  THE  RECTRCULATTON PUMP  AT A RATE

OF 20-25 GPM.  SCRUBBER EFFLUENT, MOSTLY SOOIUH SULF1TE, TS SENT TO THE MILLS PULPING OPERATIONS  BY

A CONTINUOUS BLEED-OFF LINF AT 30-35 GPM FQR EVENTUAL USE IN THE DIGESTERS.

    MILL MATER IS ADDED TO THE RECIRCULATION TANKS t»HEN NFEOFD TO COVER EVAPORATION LOSSES.  IT IS

NOT A CONTINUOUS FLOW.  EVAPORATION LOSSFS AWE  ESTIMATED TO BE APPROXIMATELY 1UO GPM.   THF  WECTRCUL-

ATION RATF TO THE VENTIIRI IS APPROXIMATFLY ?00(. RPM AND THE HFCIRCULAT ION RATF  Til  THE ABSORRFH FS

-------
                                                                              STATUS TO .IANUAWY  1979




                                       5Fcnnw  9 fcniMTiNUFii)




             PFHFORM4NCF  nfSCTPtTUM FdC OPFKAITONAI  FliO SYSTFMS ON INDUSTRIAL HOILFHS




MEAD PAPERBOAfJD CO.;  STFvFNSON,  ALABAMA (CUNT IMJEO)






ABOUT 1200 GPM.  THE  RAS  FXIIS  1HHUIIGH A FIBERGLASS STACK AT APPROXIMATELY 140 F.




    THE PH MONITORING SYSTEM  CONSISTS OF A FIBFRGLASS BOK MOUNTED ON THE REC IRCHLATTON TANK.  OVER-




FLOW FROM THE TANK  TO THE  BOX  INSURFS COKT1NUOUS FLOW.









                                         OPERATING HISTORY




   EARLY OPFRATIONS




    THE SO? SCRUBBING SYSTEM  WAS DOWN FROM MARCH THROUGH JULY 1976 DUE TO ABRASION PROBLEMS.  THE




ABRASION WAS CAUSFO PARTIALLY  BY HIGH STRF.AM VELOCITY THROUGH THE EXISTENT VENTIIRI PARTICIPATE




SCRUBBER INTO THE SO? SCRUBBER.   SODIUM CARBONATE AND CARBON PARTICLES THAT HAD NOT GONE INTO SOLU-




TION ALSO WERF VERY ABRASIVE  TO  THE  S02 SCRUBBER LINING.  IN ADDITION, THE ORIGINAL GLASS-FLAKE"




LINER (5 MM THICK)  WAS EXPERIENCING  STRESS CRACKING.




    THE HIGH VELOCITIES INTRODUCED BY THE VENTIIRI WFRE ELIMINATED BY REMOVING THE P»STICUL*TE




VENTIIRI SECTION OF  THF SYSTEM.   THE  GLASS-FLAKED LINING WAS PATCHED WITH $60,000 WORTH OF CARPENTER




20 LINER.  THESE CORRECTIVE  ACTIONS  HELPED FOR A WHILE, BUT AS IT TURNED OUT, THE CARPENTER 20  WAS




NOT INSTALLED PROPERLY AND SOLUTION  WAS GETTING BETWEEN IT AND THE MRD STEEL SHELL.  IT MAS FINALLY




DECIDED TO INSTALL  NEW RUBBER  LINING 1NSIOF THF ENTIRE SCRUBBER, INCLUDING THF SPIN VANES, AT A COST




OF 1150,000.  TO PREVENT  ANY  HEAT PROBLEMS, ADDITIONAL NOZZLES WERE INSTALLED.  TO DATE, NO MAJOR




PROBLEMS HAVE OCCURRED WITH  THE  RUBBER LINING.




    SCRUBBER MAINTENANCE  is  PERFORMED WHENEVER MILL OPERATIONS CEASE FOR ROUTINE PLANT MAINTENANCE




WHICH OCCURS SEVERAL  TIMES PFS  YEAH.  THE PH CONTROL  SYSTEM RECEIVES CONTINUING MAINTENANCE AND THE




PH PROBES ARE CLEANED ONCF PER  WFEK.




    RFFER TO FIGURE 10-3S  IN  SECTION 14 FOR A DETAIIF.D PROCESS FLOW DIAGRAM OF THIS SYSTEM.









                                           OPERATING HISTORY




4TH OUARTER-1977    MINOR FMflRITtI.EMENT, DUE TO LOCALIZED HIGH TEMPERATURE, HAS BEEN DETECTED ON THE




LINING SURFACE.  SOMF MFTAL,  NOZZLES, AND RUBBER HVAVE BEEN REPLACED.









2ND OUARTER-197A    THt PLANT  MAS DOWN 12 OATS IN JUNE FOR A MAJOR PAPER MACHINE UPDATE, AND THE




BOILERS WERE DOWN 9 DAYS  DURING THAT PERIOD.  DURING BOILER DOWNTIME, THE RUBBER LINERS IN THE




ABSORBER MODULE WERE  RfcPAIRED AND MODIFICATIONS *£RF MADE AT THE INLET TO THE ABSORBER, REDIRECTING




AIR FLOW Tn MINIMIZE  FURTHER FLYASH  ABRASION OF THE LINERS. THE PLANT REPORTED AN OPERABILITY OF




JOOX FOR THE FGO SYSTEM.









3RD QUARTER-197B     »N AVAILABILITY  OF 1001 MAS SFPOKTEO FOR THF FGO SYSTEM DURING THIS PERIOD.









4TH OIIARTFR-197S     THF. RUBBER LINER IN THE ABSORBFP AND THE DEFLECTOR SHIELD AT THE INLET OF THE
                                                 96

-------
                                                                             STATUS TO JAUIIAHT  I"»79




                                      SECTION  0 (tOKTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGn SYSTEMS ON  1NDUSTKIAL BIIILFRS




HEAD  PAPERBOARO CO.J STEVENSON, ALABAMA (CONTINUED)






ABSORBER  ARF  HOLOINK *ELL.  THE PLANT HAS REPORTED 1001 RELIABILITY  FOR THE  SCRUBBER.  ONE  OF  THE



BOILERS MAS DONN FOR Z4 HOURS AND THE OTHER MAS DOMN FOR 48 HOURS IN NOVEMBER FOR  THE REPLACEMENT



OF SEALS  AND  PREHEATERS.  THE SCRUBBER MAS CHECKED AT THIS TIME.  NORMALLY THE SCRUBBER  IS  INSPECTED



NO MORE THAN  TMICE A YEAR AND THESE INSPECTIONS AR€ DURING SCHEDULER MILL SHUTDOMNS.  FOUR  NOZZLES




IN THE ABSORBER MERE REPLACED ON DECEMBER 1ST, WITHOUT ANY DOWNTIME.



     THF.  PLANT is CONSIDERING CHANGING THE PH CONTROLLED MAKE-UP LIQUOR FEED TO  A  FLO* CONTROLLED




FEED  BECAUSE  THE PH PROBES ARE HARD TO KEFP CALIBRATED AND ARE  UNRELIABLE.
                                                 97

-------
                                                                              STATUS  TO  JANUARY  197<»

                                      SECTION  <>  (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPFWATIONAL FPO SYSTEMS ON  INDUSTKIAL BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING

  NUMBER OF SEPARATE FGO UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY
  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEH /  RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  302 REMOVAL EFFICIENCY

  HATER  MAKE-UP

  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
MINN-DAK FARMER'S CO-OPERATIVE

WAHPETON, NORTH DAKOTA

LIGNITE (1.05! SULFUR)

1M.OOO SCFM (TOTAL - 2 BOILERS)

 2

 2

82 M* (EQUIVALENT)} TOTAL - 2 BOILERS

TWO BOILERS, EACH a 275,000 LBS/HR STEAM  ^50 PSIG - 055 F)

(FOR THIS REPORT* UNLESS STATFD OTHERWISE, 2000 SCFM =  1 EQUIVALENT  Mh.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR  IN  MOOULE  SIZING.)

KOCH ENGINEERING

AMMONIA SCRUBBING

RETROFIT

JIINF, 1977

OPERATIONAL

TESTS INCONCLUSIVE.

200 CPM AMMONIACAL WASTE STREAM

WASTEWATER TREATMENT

BLEED STREAM GOES TO AN ACTIVATED SLUDGE  SYSTEM a  160 GPM

ANAEROBIC OIGFSTION, FOLLOWED BY AN OPEN  POND, FOLLOWED BY

AEROBIC DIGESTION.

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION

    MTNN-DAK FARMER'S CO-OP. HAS A SUGAR FACTORY AT WAHPETON, NORTH  DAKOTA.   THERE  ARE  TwO BOILERS,

EACH WITH A CAPACITY OF 275,000 LBS STEAP/HR AT 250 PSIG  AND «55 F.   EACH  BOILER  GENERATES 125,000

ACFM OF FLUE GAS AT 350 F.  THE FUEL BURNED IS  IX  SULFUR  LIGNITE.  SULFUR  DIOXIDE REMOVAL IS EFFECT-

ED BY AN AMMONIA WASTE STREAM FROM AN ON-SITE PROCESS ADDEu TO  THE RECIRCULATING  SCRUBBER LIOUOR.

    KOCH ENGINEERING HAS SUPPLIED TWO VARIABLE  THROAT VFNTURI SCRUBBERS  WITH  OPEN ENDED PIPE INLETS*

FOR SCRUBBING LIOUOR.  THE SYSTEM WAS PRIMARILY DESIGNED  FOR PARTICULATE CONTROL.  INLET CONCENTRA-

TIONS OF SO? AND PARTTC'ILATF ARE Tb-l<»3 LB/HB AND  .3-.4 GR/SCF  RESPECTIVELY.   OUTLET  CONCENTRATIONS

OF S02 ANO PARTICULATE ARE 10-J7 LH/NR AND  .027-.05» ftk/SCF kESPECTIVELY.   THE GAS  FROM EACH VENTURI

IS ROUTED THROUGH A CHEVRON-TYPE MIST ELIMINATOR AND ONF  7 FOOT X  130 FOOT STACK.  THE  PRESSURE DROP

ACROSS FACH SCRUBBER IS 11 INCHES n.6.  THf SCRUBBER IIOUQH IS  RECIRCULATED  AT A  RATE OF 2000 GPM

FROM A CONCRETE TAH-LINFO HECIKCIIL ATION PIT APPHOX JM4TEI » 10 FT X  10 FT  X  10  FT.  THE HECIRCllL AT ION

PUMP IS HATFO AT 75 HP AND 3000 GPM.  ANOTHER PUMP IS KFPT ON STANDBY.  SCRUBBER  SLOWDOWN IS a«h GPM

TO AN AEROBIC DIGESTER.  AFTER THF DIGESTER 1HE WASTF STREAM GOES  TO AN  0<»Eh  POND,  THEN AN AEROBIC

DIGESTER, THfW AGAIN TU A POND.

-------
                                                                              STATUS  in  JANUARY  1




                                       SECTION   <»  (CONTINUED)




             PERFORMANCE DESCRIPTION FOR  OPERATIONAL  pen  SYSTFMS  ON  INDUSTRIAL  BHHMS




MINN-DAK FARMER'S CO-OPERATIVE; WAHPETON,  NORTH DAKOTA  (CONTINUED)






    THERE ARE A TOTAL OF FIVE PONOS ON SITE, FOUR  KASTEWATER  AND  ONE  MAIN  RFSEWVOIH.   THE  FOUR




WASTEWATF.R PONDS ARE USED  INTERCHANGEABLY  FOR  MAKE-UP AN'O .tASTf DISPOSAL.   MAKE-UP  10  THE  PEClKCtlL-




ATION TANK IS 500 SPM WHERE PH  IS MAINTAINED AT APPROXIMATELY  5.a.   WHEN ADfMTIONAL  MAKE-UP IS




REQUIRED, IT IS OBTAINED FROM THE BAROMETRIC CONOENSORS.   THE  BAROMETRIC CONDENSER  *ATE»  IS THE




MAKE-UP WATER THAT CONTAINS THE "AMMONIACAL WASTE hASTE  WHICH  REMOVES  SO?.   THTS MAKE-UP IS NOT  A




CONTINUOUS FLOW.




    DEMISTER WASH WATER IS ALSO BAROMETRIC CONOENSOR  WATER AND IS A  250 6PM SPRAY  EVERY 8  HOURS.




THE PUMPS USED FOR PUMPING MAKF-UP FROM THF PONOS  AND SCRUBBER RLflWDOWN ARE LOCATFn  TN  A CENTRAL




PUMPHOUSE.  THERE ARE SEVERAL PUMPS WHJCH ARE  USED INTERCHANGEABLY.   80 GPM HATER  LOSS  TO  THE




ATMOSPHERE THROUGH THE STACK HAS BEEN  CALCULATED,  BUT NFVFR MEASURED.




    THE SCRUBBERS AND THE  LIQUOR INLET PIPES ARE MADE OF  316L  SS, THE DECISTER  AND  STACK  ARE II *>  SS,




AND THE RECIRCULATING PIPING IS FIBERGLASS. THE TOTAL  PURCHASE COST  OF THE EfHIIPMENT  WAS  *300,000




IN 1ST? DOLLARS.  INITIALLY THE SYSTEM WAS DESIGNED TO  USE A  LI"E SLURRY OF PH  10.0  AS  THF SCRUBBING




LIQUOR.  HOWEVER, DURING THE FIRST SIX WEFKS OF OPERATION, NUMEROUS  PLUGGING AND SCALING  PROBLEMS




OCCURRED.  HENCE. PLANT PERSONNEL BEGAN USING  THE  AMMONIA-RICH WASTE  STREAM FROM ANOTHER  ON-SITE




PROCESS IN EARLY 1978.




    EACH YEAR, THE PLANT ONLY OPERATES FROM SEPTEMBER - FEBRUARY.  THIS  IS THE  BEET  SUGAR  PRODUCTION




PERIOD.  DURING THE REMAINDER OF THE YEAR, PRODUCTION DISTRIBUTION IS THE  MAIN  PLANT ACTIVITY.




    REFER TO FIGURE ia-J«  IN SECTION 11 FOR A  DETAILED  PROCESS FLOW  DIAGRAM OF  THIS  SYSTEM.









                                           OPERATING HISTORY




3RD QUARTER-1976    THE FGD SYSTEM BEGAN  OPERATIONS FOR THE 117B-1979 SEASON ON SEPTEMBER  12.  NO




F60-RELATED PROBLEMS OCCURRED.  THE WASTE TREATMENT HAS BEEN  MODIFIED TO  INCLUDE AN  ANAEROBIC




OI6ESTER FOLLOWED BY AN OPEN POND ANO  AN  AEROBIC D1GESTFR.








«TH OUARTER-1978    EXCESSIVE HEAT LOSS WAS A  PROBLEM FOR THE  DIGESTERS.   THEY  ARF  CURRFNTLY ONLY




PARTIALLY ENCLOSED.  PLANS ARE  BEING MAOt  TO ENCLOSF  MORE OF  THE  WASTE TREATMENT FACILITIES.  OTHER-




WISE, THE FGD SYSTEM PERFORMED  WELL FOR IHE OUARTEK.  PLANT PERSONNEL FEEL MOST OF  THEIR  INITIAL




PROBLEMS HAVE BEEN SOLVED.

-------
                                                                             STATUS TO JANUARY 1979

                                      SECTION  9 (CONTINUED)

             PERFORMANCE DESCRIPTION FOB OPERATIONAL FGO SYSTEMS ON INOOSTRTAL BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING

  NUMBER OF SEPARATE FGO UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  S02 REMOVAL EFFICIENCY

  SLUDGE OR BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
MOBIL OIL COMPANY

SAN ARDH, CALIFORNIA

OIL (2.OX - 2.251 SULFUR)

175,000 SCFM (TOTAL - 2» BOILERS)

?B

28

9! MM (EQUIVALENT); BOO MM BTU/HR! TOTAL - 28 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE. 2000 SCFM = 1 EQUIVALENT Ni
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SHINS.)

IN-HOUSE DESIGN

SODIUM HYDROXIDE SCRUBBING

RETROFIT

1970

OPERATIONAL

901 (1500 PPM 3 INLET)

HOLDING POND FOR EVAPORATION

SEE SECTION 11 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND INFORMATION



     THE MOBIL OIL COMPANY HAS AN OIL SITE IN SAN ARDO, CALIFORNIA WHERE 20 STEAM 6ENERATORS ARE

USED TO FORCE OIL OUT OF WELLS BY A DEEP WELL STEAM INJECTION PROCESS.  THE FUEL USED IS CRUDE OIL

WITH 2 - 2.5Z SULFUR.  EACH STEAM GENERATOR IS FOLLOWED BY AN INDIVIDUAL FGD SYSTEM DESIGNED BY

IN-HOUSE ENGINEERING.  THE UNITS EXPERIENCED STARTUP IN THE PERIOD FROM 1973 THROUGH 1974.

    THERE ARE TWO SIZES OF STEAM GENERATORS; 22MM BTU/HR  (20 UNITS) AND 50MM BTU/HR (8 UNITS).

THE SMALL UNITS GENERATE 8,000 ACFM, AND THE LARGE UNITS  18,000 ACFM.  THE GASES ARE

SCRUBBED BY A LIHUOR CONSISTING OF NAOH AND ALKALINE OIL  FIELD WASTEWATER 
-------
                                                                              STATUS TO JANUARY 1979




                                       SfCTTOW   O  (CONTINUED)




             PERFORMANCE DESCRIPTION  FOH  (IHFWAI IONM  FRf)  SYSTEMS  (IN TNOIISTHlAi  BOILERS




MOBIL OIL COMPANY; SAN AROO, CALIFORNIA  (CONTINUED)






CANNOT HE HYPASSETI.  THE MISI ELIMINATORS,  ORIGINALLY 316L  ss,  HAVE BEEN LINEO WITH PHI-NOLTC EPOXY




RESTN TO COMBAT CORROSION.




    REFF.R TO FIGURF 11-36  IN SECTION  10 FOR A  DETAILED PROCESS  FLOW DIAGRAM OF THIS SYSTEM.









                                        OPERATING HISTORY




    INADEQUATE MIST REMOVAL HAS  RESULTED  IN CORROSION OF  THE  1.0. FAN IMPELLER. BLADES, AND HUBS,




WHICH NEED REPLACEMENT F.VERY YEAR.   THE HIGH CLORIOF  CONIFNT  IN THE WASTFWATER IS THE PRIMARY CAUSE




OF PITTING OF S3 MATERIAL.




3RD OUARTFR-1978    FOR THIS PERIOD,  THERE  WAS NO MAJPR DOWNTIME  REPDRTF.D AS A RESULT OF EQUIP-




MENT OR PROCESS FAILURE.   RELIABILITY WAS ESTIMATED  AT ABOUT  901.  A BECKKAN PH CONTROL UNIT WAS




INSTALLED ON A SCRUBBING UNIT WITH  PLANS  TO ADD MORE  CONTROLLERS.









«TH OUABTER-197D    THE I.D. FANS ARE ALSO  LINED  WITH EPOXY RESIN TO REDUCE CORROSION.  THE BFCK-




MAN PH CONTROLLER HAS PERFORMED  WELL  AND  SEVERAL  MORF OF  THESF  DEVICES HAVE BEEN INSTALLED.  THE




AVERAGE AVAILABILITY OF AN FGD SYSTEM WAS ABOUT 95 PERCENT.
                                                101

-------
                                                                             STATUS TO JANU»R* 1979

                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INOUSTRTAt BOILERS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBER OF SEPARATE FGD UNITS
  NUMBER OF BOILERS BEING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP DATE
  CONTROL SWEN STATUS
  802 REMOVAL EFFICIENCY
  PARTICULARS REMOVAL EFFICIENCY
  MATER MAKE-UP
  SLUDBE Off BY-PRODUCT DISPOSAL
  CONTROL 9YSTEM COST
NFKOOSA PAPERS, INC.
ASHDOMN, ARKANSAS

COAL (IS - 1.5X SULFUR)
ill,000 SCFM (TOTAL - 1 BOILER)

 2
 1
105 Ml* (EQUIVALENT)? DESIGN - 500,000 LB/HR STEAM
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = t EQUIVALENT MW.
THIS IS BECAUSE CAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

AIRPOL INDUSTRIES

CAUSTIC SCRUBBING
NEW

FEBRUARY, 1976

OPERATIONAL
90+X (600 PPM a INLET)
9BZ - 991 (l.«2 GR/SCF AT INLET)

OPEN LOOP

ALKALINE SULFITE/BISULFITE RECYCLED TO PULP PROCESS
302 RECOVERED FROM SODIUM 9ULFITE/SULFATE LIQUOR AND RE-
CYCLED TO PULPING PROCESS.

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

    TME NEKOOSA-EDMARDS PAPER PULP MILL IN ASMDOMN. ARKANSAS OPERATES A SINGLE 105 MM EQUIVALENT
STEAM BOILER FIRED MITH COAL OR FUEL OIL.  THE BOILER IS DESIGNED FOR 500,000 LB/HR STEAM AT 850

PSI.  TME COAL HAS 1-1.SX SULFUR AND A HEATING VALUE OF 12,000 BTU/LB.  IT IS BURNED AT A RATE OF 27
TONS/HR.  TME BOILER IS OPERATED CONTINUOUSLY AT (24 HRS/DAY) 40* TO 60S LOAD.

    THO AIRPOL VARIABLE THROAT VENTURI SCRUBBEKS ARE DESIGNED TO REMOVE BOTH SULFUR DIOXIDE AND

PARTICULATE AT AN AVERAGE PRESSURE DROP OF 14-16 INCHES n.G.  THE INTENT OF NEKOOSA-EDMARDS MAS TO
MAKE, FROM TME SCRUBBER EFFLUENT, 3ALTCAKE MHICH MOULD BE USED AT THE MILL.  EACH VENTURI IS FOLLOW-

ED BY A CYCLONIC SEPARATOR.  THE SEPARATORS ARE MILD STEEL WITH FLAKEGLASS LININGS.  EACH SCRUBBER
HANDLES HALF OF THE INCOMING FLUE GAS, THE TOTAL AMOUNT OF GAS BEING 325,000 ACFM AT 355 F.  THE

INLET S02 CONCENTRATION IS TYPICALLY 600 PPM WITH A PARTICULATE LOADING OF 1.42 GAL/SCFM.  SCRUBBING
LIQUOR IS RECIRCULATED AT A RATE OF 2,000 GPM THROUGH PUMPS RATED AT 2,200 GPP.

    THE TMfl RFCTRCIILATION TANKS ARf MRf! STFFL »Nfl ARE LINED.  TMFRF SIZE IS ESTIMATED TO «F 15 FEET

HIGH X 10 FEET IN DIAMETER.  BLOMOOMN FROM THE RECIRCULATION TANKS  IS 300 GPM THROUGH PUMPS RATED AT
300 GPM.  FROM THE RECIRCULATION TANKS, THE BLOKDOWN GOFS TO AN ASH PONO, THEN A STABILIZATION POND
AND FTNALLT TMF »TVFR.  SCRIIBBFR MNHERFl n* CONStSTS OF FLYASH AND * SOLUTION flp NA2S01/S01.
                                                102

-------
                                                                              STATUS  t(l JANUARY  1979




                                      SFCT10N  9  (CONTINUED)




             PERFORMANCE DESCRIPTION FOR HPFRA1TONAL FED  SYSTEMS ON  INOIISTWTAI HIITLFRS




NEKOOSA PAPERS. INC.I ASHOOWN, ARKANSAS  (CONTINUED)






    CAUSTIC IS USUALLY OBTAINED AS  A nASTF  STHtAM  AFTER  THE PULP BLEACHING  STAGE.  IT  IS USED  AT  A




RATE Of 500-600 GPM, OR 12 LB/MIN OF SODIUM HYDROXIDE  AND IS  ADDED TO  THE RECIRCULATION  TANK.




PURCHASED CAUSTIC IS OCCASIONALLY USED.  IT IS USED  AS A  50X  SOLUTION,  EXACTLY THE HAY IT  IS PUR-




CHASED.  THE USAGE RATE IS 1  TO 4 SPM AND  IT  IS  INJECTED  ON THE SUCTION SIDE  OF  THE  RECIHCULATION




PUMP.  THE PH OF THE .ENTERING CAUSTIC IS 10.5 TO  11.   THE PH  IN THE  RECTRCULATION TANK IS  5.5  TO




6.0.  PH PROBES ARE LOCATED  IN THE  FIBERGLASS LINE BETWEEN THE SEPARATOR AND  RECIRCULATION TANK.




    GASES ARE EXHAUSTED THROUGH A FLAKEGLASS LINED STACK  APPROXIMATELY  12 FEET IN DIAMETER AND  200+




 FEET IN HEIBHT.  THF OUTLET  TEMPFRATURF is 125 F.   THFRE is  NO RFHFAT.




    THE PREDOMINANT DIFFICULTIES WITH THE  FSO SYSTEM HAVE BEEN TWO-FOLD. FIRST,  THE PLANT HAS  HEF.N




UNABLE TO DEVELOP AN ADEQUATE PH CONTROL MECHANISM.  THF  PH CONTROL  SYSTEM  MONITORS  THE  AMOUNT  OF




CAUSTIC A6ENT» I.E., SODIUM  HYDROXIDE. WHICH GOES  INTO THE RECYCLE TANK, KEEPING  THE PH  OF THE




SCRUBBER SOLUTION AT A NONCORROSIVE LEVEL.  THE PLANT  HAS BEEN PLAGUED  WITH PROBLEMS IN




OPERATING THE PH CONTROL SYSTEM AND HAS  SUFFERED  A GREAT  DEAL OF CORROSION.  THE  SECOND  PROBLEM




CONCERNS THE CHEMICAL REGENERATION  PORTION  OF THE  SYSTEM. THE INTENT  OF THF  PLANT WAS TO  SEPARATE




THE Fit *8H FROM THE 3CRUB8ER LIQUID AND TAKE THE  SCRUBBER LIQUID  THROUGH A SERIES OF  EVAPORATORS




WHERE SODIUM SULFATE, I.E..  SALTCAKE, WOULD BE GENERATED. THE PLANT HAS BEEN UNABLE TO  OPERATE THE




FLY ASH SEPARATION SYSTEM PROPERLY, AND  THERE IS  NOT ENOUGH EVAPORATION CAPACITY  FOR THE PLANT  TO




PROCESS THE SCRUBBER EFFLUENT AT FULL OPERATIONAL  CAPACITY.




    IN SPITE OF THE OPERATIONAL PROBLEMS,  THE SULFUR DIOXIDE  AND PARTICIPATE  REMOVAL EFFICIENCIES




OF THE F6D SYSTEM ARE 90 AND  99 PERCENT, RESPECTIVELY, ACCORDING TO  THE PLANT ENGINEER.  THF WASTE




PRODUCT FROM THE SCRUBBER IS  NOT RECYCLED,  AT PRESENT, AND IS PUMPED TO THE wASTEWATER TREATMENT




PLANT.



    UPON STARTUP, PROBLEMS OCCURRED WITH THE PIPING  AND  VALVES WHICH WERE CONSTRUCTED  OF CARBON




STEEL.  THE CARBON STEEL StSTEM WAS REMOVED AND REPLACED  WITH STAINLESS STEEL VALVES AND PIPING.




SOME PIPING LEAKS OCCURRED AND WERE REwELDEO.  SOME  CORROSION OF DUCT  DAMPERS OCCURRED AND WFRE RE-




LIEVED BY ADJUSTING THE PH OF THE SCRUBBING LIQUOR.




    REFER TO FIGURE 19-37 IN  SECTION la FOR A DETAILED PROCESS FLOW  DIAGRAM OF THIS  SYSTEM.








                                         OPERATING HISTORY




3RD OUARTER-1977    NO MAJOR  PROBLEMS WERE  REPORTED.   CORROSION PROBLEMS STILL EXIST AND PH  CONTROL




IS STILL A PROBLEM.  FLOW METERS ARF BEING  INSTALLED TO MONITOR SCRUBBER "ATER.








«TH OUARTER-1977    TWO IN LINE FLOW METERS WERE  INSTALLED ON EACH SCRUBBER,  ONF  AT  THE  THROAT  INLET




OF THE VENTURI AND ONE AT THE THROAT.  THE  PLANT  REPORTFO THAT PH CONTROL WAS STILL  A PROBLEM.




SOME PROBLEMS WERE BEING ENCOUNTERED WITH  THE PH PROBES DUE TO THE CONSTANT FLOW OF LAHGE




AMOUNTS OF SOLIDS, AND SOLIDS DEPOSITS ON THE PROBES.

-------
                                                                              STATUS TO JANUARY 1979




                                                9 (CDNTIMif-h)




                         rtFSCRlPTK"  r MK  npFRATIONAl  FGD  SYSTFMS ON INDUSTRIAL  BtULERS




NEKOOSA PAPFRS,  INC.; ASHODHN,  ARKANSAS  (CONTINUED)











3NO QUARTEH-1<»7«    NO MAJOR PROBLEMS OCCIIRREn  DURING THE RFpnRT PERIOD.  IN JUNF A PARTICIPATE




COMPLIANCE TEST HAS RUN'.  PARTICIPATE EMISSIONS HFRF  0.05 LH/MM HTII AGAINST THE 0.1 LB/MM BTU




REGULATION.  CAUSTIC SCRUBBING  SOIHT10N  IS  CYCLEO  TO  THF  SCRIIRHFR FROM THE PULP BLEACH PLANT




AT «oo 6PM.  THF ROTLFR OPERATED 2153 HOURS AT  aoz TO &oz CAPACITY.  DURING THAT PERIOD THE SCRUBBER




DEMONSTRATED 1 OOt OPF.RABIL ITY.









3RD QUARTER-197H    DURING THIS RFPOPT PERIOD THF  ONLY  PROBLEM THAT WAS REPORTED WAS A RECYCLE




PUMP FAILURE CAUSING ONE SCRU88FR TO  BE DOWN FOR APPROXIMATELY 1.5 DAYS.  HOHEVERt  OUF TO THE




PARALLEL ARRANGEMENT OF THE SCRUBBING TRAINS AND LOW  OPERATING LEVEL OF THE BOILER  (40 - 60S), THE




TOTAL FLUE GAS Finn MAS ROUTED  THROUGH THF  REMAINING  SCRUBBER  TRAIN.  THE BOILER HAS REPORTED




TO OPERATE 24 HOURS PFR DAY DURING  THIS PERIOD.









OTH OUARTF.R-1978    DUE TO THE  PARALLEL ARRANGEMENT OF  THE SCRUBBER MODULES AND LOW BOILER LOADS,




SCRUBBER-RELATED BOILER DOWNTIME IS RARE.   THE  ENTIRE VOLUME  OF FLUE GAS CAN BE ROUTED TO ONE OF THE




SCRUBBERS WHEN THF OT«f.R NEEDS  MAINTENANCE  WORK.  HOMFVER> THE PLANT IS CURRENTLY UNDERGOING EXPAN-




SION WHICH HILL REQUIRE BOILER  LOADS  OF 80Z TO  90Z.   THIS HILL MEAN THAT THE ENTIRE VOLUME OF GAS




HILL NOT BE »BLF TO BE ROUTED THROUGH ONE MODULE AND  PLANT PERSONNEL REPORT THAT THEY EXPECT MORE




BOILER DOWNTIME DUE TO FGD PROBLEMS OR AT LEAST REDUCED OPERATING LOADS.




    DURING THIS QUARTER, THF LINING OF ONE  OF THF  SEPARATORS HAS PATCHED.  THE  LINING HAD SEEN




CHIPPING OFF CAUSING THE MILD STEFL SHELL TO CORRODF.  CORROSION LEAKS IN THE SEPARATOR WERE ALSO




REPAIRED.  THE BOILER HAS NOT SHUT  DOWN.  PLANS HAVF  BEEN MADE TO RELINE THF SEPARATORS HITH AN AS




YET UNDETERMINED LINING MATERIAL IN THE SPRING.




    PURCHASED CAUSTIC (S700-SBOO/DAY) HAS USED  5 TO 4 WEEKS THIS QUARTER SINCE  THE  PUMP THAT




DELIVERS THE ON-SITE CAUSTIC FROM THF PULP  BLEACHING  OPERATION BROKE DOHN DUE TO A  MECHANICAL




FAILURE.  NO SCRUBBER DOWNTIME  RESULTED.




    PH PROBFS ARE CLEANED THICE HEEKLY.   AN AVAILABILITY  OF 100Z HAS DEMONSTRATED BY THE F60 SYSTEM.
                                                101

-------
                                                                             STATUS TO JANUARY 1979




                                      SECTION  1  (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPFRAT TllNftL FGD SYS1FMS ON  INOIISTKIAL 80IUFRS
  INSTALLATION NAME




  INSTALLATION LOCATION




  SOURCE CHARACTERISTICS




  SOURCE RATING









  NUMBER OF SEPARATE FGO UNITS




  NUMBER OF BOILERS BEING CONTROLLED




  CONTROL SYSTEM VENDOR




  CONTROL PROCESS




  NEW / RETROFIT




  START-UP DATE




  CONTROL SYSTEM STATUS




  808 REMOVAL EFFICIENCY




  SLUDGE OR BY-PRODUCT DISPOSAL




  CONTROL SYSTEM COST
NORTHFRN OHIO SUGAR COMPANY




FREFCflNT, OHIO




COAL (IX SULFUR)




80,000 SCFM (TOTAL - 2 BOILERS)




110,000 LB/HR STEAM (TOTAL - 2 BOILERS)




 I




 ?




GREAT WESTERN SUGAR




SODIUM HYDROXIDE SCRUBBING




RETROFIT




OCTOBER, 1975




OPERATIONAL








MASTEWATER TREATMENT AND DISCHARGE TO CITY SEWER




SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND  INFORMATION




    THE FGD SYSTEM CURRENTLY OPERATING  AT THE FREEMONT, OHIO PLANT  OF GREAT WESTERN SUGAR




HAS BEEN DESISNFO FOR BOTH SOZ ANf> PARTICIPATE CONTROL.   THE SYSTEM CONSISTS OF A VARIABLE THROAT




VENTURI SCRUBBER MITH A SINGLE PASS, THREE  STAGE CHEVRON  DEMISTER.




    A BLEED-OFF STREAM OF SCRUBBER EFFLUENT IS CONTINUOUSLY DISCHARGED  TO  A HOLDING POND FOR




TREATMENT.




    REFF.R TO FIGURE 11-26 IN SECTION 1« FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.
                                               10-5

-------
                                                                             STATUS TO JANUARY  1979

                                      SECTION  9 (CONTINUED)
             PERFORMANCE RESCRIPT TON FOH OPFRATIONAL FGO SYSTEMS ON INDUSTRIAL BOTLEKS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING

  NUMBER OF SEPARATE FGD UNITS
  NUMBER OF BOILERS BEING CONTROLLED
  SOURCE CAPACITY

  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW  /  RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  SOB  REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY
  MATER  MAKE-UP
  SLUOSE OR RY-PROOUCT DISPOSAL

  CONTROL SYSTEM COST
RICKENHACKER AIR FORCE
COLUMBUS, OHIO
COAL (3.6% SULFUR)
55,000 SCFM (TOTAL - 7 fiOTLERS)
277,000 L8/HR STEAM
 1
 7
27 M* (EQUIVALENT)? TOTAL - 7 BOILERS
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EUUIVALENT MK-.
THIS IS HFCAUSE GAS FLOW RATE IS THF PRIMARY FACTOR IN MOOULf SI/ING.)
RESEARCH-HUTTRFLL/BAHCO
LIMESTONE SCRUBBING
RETROFIT
MARCH, 1976
OPERATIONAL
90X* (OFSI6N)
ACTUAL REMOVAL IS NOW LOWER DUE TO EASING UF REGULATIONS.
981
OPEN LOOP - 2.5 GPM/MW (MAX)
NON-FIXATFO SLURRY TO LINED POND
UNSTABILI7F.H TASOS/SOO SLUDGE TO LINED POND
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
    ON MARCH 11, 1976 THE FIRST U.S. INSTALLATION OF THF SWEDISH BAHCO SULFUR OIOXIDF. REMOVAL SYSTF.M
HAS PLACED IN SERVICE AT RICKENBACKER AIR FORCfc BASE IN COLUMBUS, OHIO.  THF SYSTEM, MANUFACTURED
BY A.B. BAHCO VENTILATION OF ENKOPING, SwFOEN, DISTRIBUTED EXCLUSIVELY IN THE UNITED STATES BY
RESEARCH/COTTRELL,  WAS ORIGINALLY INSTALLED AT RICKENBACKER TO HANDLE THE FLUE GAS FROM SEVEN
31 MM BTU/HR STOKER-TYPE COAL FIRED BOILERS INSTALLED BFTWEFN 1951 AND 1956.  IN JUNE 1977, A NFh
60 MM BTU/HR BOILER CAME INTO SERVICE.  THIS UNIT SFPLACEO Z OF THE OLDER BOILERS, AND A THIRD WAS
PLACED ON STAND-BY.  THE BOILERS ALL FIRE A HIGH SUIFIIR (3.6Z) COAL.
    THE RICKENBACKER EMISSION CONTROL SYSTEM CONSISTS ESSENTIALLY OF A MECHANICAL COLLECTOR, 2-STAGF.
BACHO SCRUBBER TOWER, LIMESTONE STORAGE AND HANDLING SYSTEM, CLARIFIER, BOOSTER FAN AND ASSOCTATfO
DUCT-WORK, PUMPS, CONTROLS, AND A SLUDGE DISPOSAL POND.
    SOLID PARTICULATE AND SULFUR OIOXIDE-LADFN FLUE GAS TAKEN FROM FACH OF THF EXISTING SIX
STACKS IS FED THROUGH A COMMON HEADER AND INTO A MECHANICAL COLLECTOR WHERE PRIMARY PARTICULATE
REMOVAL TAKES PLACE.  THE MECHANICAL COLLECTOR HAS A DESIGN REMOVAL EFFICIENCY OF 70 PERCENT AND
WAS INSTALLED PMIMAHILY  III REOMCfc FAN .HEAR.  THF PARTIALLY CLEANtO GAS THFN FLOWS INTO THF BACHO
                                                106

-------
                                                                             STATUS TO JANUARY 19T9


                                      SECTION  9  (CONTINUED)


             PERFORMANCE DESCRIPTION FOR OPERA! Tf)*»l FGD SYSTEMS ON  INDUSTRIAL BOILERS


RICKENBACKER AIR FORCE BASE} COLUMBUS, OHIO  (CONTINUED)




TOWER WHERE ADDITIONAL PARTICULATE  AND PRIMARY SULFUR DIOXIDE REMOVAL TAKES PLACE.


    THE BACHO SCRUBBING VESSEL IS A VERTICAL TOWER  CONSISTING OF TWO SCRUBBING STAGES.  GAS FLOWS
  *

THROUGH THE TOWER WHERE IT IS CONTACTED KITH A LIMESTONE SLURRY.  AFTER PASSING THROUGH THE


FIRST SCRUBBIN8 STA6E, ENTRAINED MOISTURE  IS REMOVED BY A CYCLONIC TYPE MIST ELIMINATOR.  THE


GAS THEN PASSES THROUGH A SECOND SCRUBBING STAGE  AND A SECOND CYCLONIC MIST ELIMINATOR.  THE


CLEANED GAS IS DISCHARGED TO THE ATMOSPHERE  THROUGH A STUB  STACK ATOP THE  ABSORBER TONER.


    FINE MESH LIMESTONE IS EMPLOYED AS THE REAGENT  IN THE SCRUBBING  SYSTEM.  THE SCRUBBING SLURRY  IS


 PUMPED TO THE ABSORBER WHERE IT TS CONTACTED WITH  THE FLUE GAS  IN A COUNTERCURRENT FASHION.


    THE SPENT SCRUBBING SOLUTION IS DISCHARGED TO THE THICKENER  WHERE THE  WASTE SOLIDS SETTLE OUT.


THICKENER OVERFLOW IS RETURNED TO THE MIX/HOLD TANK.  THICKENER  UNDERFLOW  IS DISCHARGED TO A 5-


*CR€ HVfNU.OH-t.INEn DISPOSAL POND.   THIS POND IS LOCATED APPROXIMATELY 000  FEET FROM THE ABSORBER


TOMER*  CLEAR WATER FROM THE POND IS RETURNED TO  THE PROCESS AS  MAKE-UP WATER IN THE SLURRY TANK.


    REFER TO FIGURE 10-39 IN SECTION 14 FOR  A DETAILED PROCESS FLOW  DIAGRAM OF THIS SYSTEM.






                                         OPERATING  HISTORY


MM* 76 THROUGH OCT. 76    THE INITIAL OPERATION  PROCEEDED  IN AN OPEN-WATER-LOOP MODE BECAUSE THE


THICKENER MAS NOT VET COMPLETELY INSTALLED.  SULFUR DIOXIDE INLET CONCENTRATIONS WERE IN THE 1SOO  TO


2000 PPM RANGE.  HIGH OXYGEN CONCENTRATIONS  ALSO  EXISTED IN THE  FLUE GAS BECAUSE THESE OLDER, IN-


EFFICIENT BOILERS OPERATE AT 150 TO 160 PERCENT EXCESS AIR  RATES.  SULFER  DIOXIDE REMOVAL EFFICIFNCY


HAS IN THE LOW <>0 PERCENT PLUS RANGE.  EARLY PROBLEMS HERE  PRIMARILY OF A  MECHANICAL NATURE USUALLY


ASSOCIATED WITH START-UP.  THE MAJOR START-UP PROBLEMS HERE AS FOLLOWS:


IIP PROBLEMS WERE AS FOLLOWS!


         1. ELECTRICAL CIRCUITS AND SYSTEM CONTROL  PANEL.


         2. PUMP MALFUNCTION-SPARE  PARTS SHIPMENT DELAY.


         3. SEDIMENTATION BUILDUP IN THE SCRUBBER VESSEL (THIS WAS DUE PRIMARILY TO OPERATION AT


            HIGHER THAN DESIGN SOLIDS CONCENTRATION IN THE  SCRUBBING SOLUTION BECAUSE THE THICKENFR


            WAS NOT TET IN SERVICE  PLUS GRIT GETTING THROUGH THE LIME SLAKER GRIT REMOVAL STEP).


         4. FAMILIARIZATION OF THE  OPERATING S1AFF  WITH THE MECHANICS OF THE PROCESS.


         5. 1.0. BOOSTER FAN PROBLEMS.  ADDITIONAL  BRACING, AND  EPOXY GROUTING "AS REQUIRED TO STOP


            THE ELEVATED FAN CONCRETE SUPPORT FROM  VIBRATING WHILE THE FAN WAS OPERATING.






NOV. 76 THROUGH JUN. 77    DOWNTIME WAS LESS THAN 5X.  OPERATING PROBLEMS  WERF MECHANICAL- AND


CONTROL- RATHER THAN PROCESS-RELATED.  FAN-RELATED  PROBLEMS ACCOUNTED FOH  OVER 75* OF THE ACTUAL


DOWN-TIME.  THIS RESULTED FROM EXCESSIVE FAN VIBRATIONS CAUSED BY BEARING, SUPPORT, AND INSTRUMENT-


ATION DIFFICULTIES.  IN APRIL 1977. THE FAN WHEEL DEVELOPED A CRACK  IN THE RIM ATTRIBUTED TO


FATIGUE FROM RESONANT VIBRATION.  THE FAN NAS SENT  BACK TO  THE MANUFACTURER, AMFRICAN STANDARD, »HO
                                                107

-------
                                                                              STATUS  10  JANUARY  lilt
                                      SETT inn.   9  (rn;»TiwiFo)
                         DESCRIPTION FOP  HPFWA1TONAL  FB5  SYSTEMS  (IN  fNIHISTHIAL  BOILERS
RICKENBACKFR AIR FORCE RASEj COLUMBUS, OHIO  (CONTINUED)
MADE THE REIIItBEn MODIFICATIONS.  THE ORIGINAL  FAN WSS RADIAL BLADE  WITH  RIMS,  AND A  MAJOR  MODIFI-
CATION HAS CHOPPING THE RIMS OFF, THFREBY  REDUCING THE DIAMETER.   THE  FAN w»s RETURNED  IN EARLY  MAY
AND THE VIBRATION PROBLEM WAS SOLVED.  OTHER OPERATIONS flERE RELATIVELY PROBLEM-FREE.   THERE  WERE
NO CORROSION, EROSION, SCALING, OR PLUGGING PROBLEMS.  THE SYSTEM BEGAN RUNNING ON LIMESTONE  IN
APRIL, AS PART OF THE EPA TEST PROGRAM.   LIMESTONE PERFORMED WELL, YIELDING  AOEOUATE  REMOVAL.
ON JUNE 3RD, THE STFAM PLANT WAS SHUTDOWN  FOR THE TTE-IN  OF THE NEW  NO. 8 BOILER.  TIE  IN WAS COM-
PLETED IN JIJN€.

AUG. 77     THE ARMS BROKE OFF IN THE 35-FOOT DIAMETER THICKENER  TANK, CAUSING  A 30 DAY DOWNTIME.
SEP. 77     A HAKF-UP KATF.R BOOSTER PUMP  HAD TO HF REPLACED.
OCT. 77     THE MOTOR DRIVE ON THE SLAKER  BELT  HAD TO BF  REPAIRED.   ALTHOUGH THE SLAKER IS  NO LONGER
USED HITH THE LIMESTONE REAGENT, THE BELT  IS USED TO  CONVEY THE LIMESTONE TO THE DISSOLVING TANK.

1ST QUARTER-1<)7 8    IT WAS DISCOVERED THAT WITH A STOICHIOMF.TRIC  RATIO OF 0.75  THE REQUIRED DEGREE
OF 302 REMOVAL CAN BE ACHIEVED.  THE CURRENT REGULATION LIMITS EMISSIONS  TO  2.2 LBS/MK  BTU  HEAT
INPUT.  DURING THE JANUARY BLIZZARD, SOME  FREEZE-UP PROBLEMS WERE ENCOUNTERED.
DURING JANUARY THE BOILERS OPERATED 744 HOURS AND THE FGU SYSTEM  OPERATED 546 HOURS YIELDING  OPER-
ABILITY AND AVAILABILITY INDEX VALUES OF  801.   ALL DOWNTIME WAS ATTRIBUTABLE TO FREEZE-UPS  DURING
BLI7ZARD CONDITIONS.  DURING FEBRUARY, THF BOILERS OPERATED b?a HOURS  AND THE CONTROL SYSTEM  OPERA-
TED 168 HOURS.  HOWEVER THE FGO SYSTEM WAS AVAILABLE  55!  HOURS.   THEREFORE THE  OPERABILITY  INDEX WAS
351 WHILE THF AVAILABILITY WAS 82*.  THE  ABSORBER LINES WERE THAWED  OUT FEBRUARY 6, BUT DURING
FEBRUARY, THE GOVERNOR OF OHIO TEMPORARILY SHELVED POLLUTION CONTROL REGULATIONS.  THEREFORE  THE
F6D SYSTEM WAS NOT OPERATED ALTHOUGH IT WAS AVAILABLE FOR OPERATION.  THE SYSTEM WAS  SHUTDOWN ON
FEBRUARY 13 AND DIO NOT OPERATE DURING MARCH.

2ND OIIAHTER-l^TB   SYSTEM WAS RESTARTED APRIL 10  AND  WAS  REPORTED TO HAVE RUN WITH A  100* OPERA-
BILITY INDEX VALUF FOR THE REMAINING PERIOD.  PLANT REPORTED THAT ALL  PREVIOUS  PROBLEMS HAVE
BEEN CORRECTED.  DURING THE LAST PORTION  OF THE 2ND QUARTER THE BOILER LOAD  DROPPED TO  ITS  SUMMER
LEVEL, ABOUT SO MM BTH/HR, AS OPPOSED TO  THE MAXIMUM  COLO SEASON  LOAD  OF  150 MM BTU/HR.

3RD QIIARTFR-1978    THE SYSTEM OPERATED hITH AN AVAILABILITY INDEX OF  OVER 99.51 FOR  THE
PERIOD.  THE SCRUBBER WAS CLEANED AND INSPECTED DURING A  5-OAY BOILER  MAINTENANCE OUTAGE AND
FOUND  TO «E RFLATIVFLY FRFE OF CORROSION  AND SCALING.  THF SYSTEM WAS  OBTAINING ABOUT 75% 802
REMOVAL, WHTCH WAS SUFFICIENT TO MEET THE REGULATION.  WHILE THE  BOILER IS OPERATING  AT ITS REDUCED
SUMMER LOAD, FRESH MAKE-UP AIR  IS BEING MIXED WITH THE FLUE GAS ENTERING  THE F.D. FAN TO MAINTAIN
FULL CAS P»FSSU»E AMD VELOCITY  THROUGH  THF ABSORBER.
                                                108

-------
                                                                             STATUS TO JANUARY  1
-------
                                                                              STATUS TO JANUARY 1979

                                      SECTION  9  (CONTINUED)

             PERFORMANCE DESCRIPTION FOR flPFRATIONAl  FGD  StSTFMS  ON  INDUSTRIAL BUUERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING

  NUMBER OF SEPARATE F6D UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW  /  RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  SOE  REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  MATER  MAKE-UP

  SLUDGE OR BY-PRODUCT DISPOSAL



  CONTROL SYSTEM COST
ST. REGIS PAPEK CO.

CANTONMENT. FLORIDA

BARK,01L/GAS  (< i.OX SULFUR)

115.000 SCFM  (I BOILER)

 1

 1

57 MW (EQUIVALENT)? DESIGN - 100,000 LR/HR STEAM

(FOR THIS REPORT, UNLESS STATED OTHERWISE^ 3000 SCFH  =  I  EQUIVALENT Mh.
THIS IS BECAUSE GAS FLOW RATE  IS THE PRIMARY FACIOR  IN  MODULE SIZING.)

AIRPOL INDUSTRIES

CAUSTIC SCRUBBING

RETROFIT

1973

OPERATIONAL

801 - 90X

90.5X (100 LB/HR AT INLET)

OPEN LOOP; 200 GPM-250 GPM SCRUBBING LIQUOR FEED

WASTfcWATFR TREATMENT

EFFLUENT IS TREATED IN AN ON-SITE SEWAGE  TREATMENT PLANT

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION

    THE BOILER AT ST. REGIS PAPER LOCATED  IN CANTONMENT,  FLORIDA  IS  RATED  AT  57  MW EQUIVALENT AND

PRODUCES 300,000 LBS/HR STEAM.  THE TYPICAL SULFUR CONTENT  OF  THE  FUEL  (OIL OR BARK,  NATURAL GAS) IS

LESS THAN IX.  THE HEATING VALUES OF THE FUELS  ARF AS FOLLOWS;  BARK  d SOX  HOIS URE IS 4030 BTU/LR,

THE OIL IS 6,000,000 RTII/BARREL AND THE GAS IS  IflOO  BTU PER CUBIC  FOOT.

    THE SCRUBBER SYSTEM WAS RETROFITTED BY AIRPOL  IN 1973.   THE UNIT IS  CONSTRUCTED OF 31f>L STAIN-

LESS STEEL AND HANDLES 8 TOTAL FLUE RAS VOLHMF  OF  175,000 ACFM.   PARTICULATFS »RE CONTROLLED BY

CYCLONES PRECEDING THE SCRUBBER.  SCRUBBER PRESSURE  D«OP  IS APPROXIMATELY  10  IN. W.G. WITH RD-90X

SULFUR DIOXIDE REMOVAL EFFICIENCY.  THE SCRUBBER  TS  FOLLOWED BY A  CHEVRON-TYPE MIST ELIMINATOR.

    SCRUBBER UNDERFLOW CONSISTS UF ASH AND A SODIUM  SULFITE/SULFATE  SOLUTION. BLOWDOWN FROM THE

SCRUBBER OCCURS EVERY FEW MINUTES.  TO MAINTAIN THE  RECIHCULATION  TANK  AT  A CONSTANT VOLUME, A SOL-

ENOID IS USED WHICH  AUTOMATICALLY OPENS A  VALVE AND  INTRODUCES MAKE-UP  WATER  WHEN THE LEVEL OF THE

LIQUOR DROPS TO A CERTAIN POINT.  THE TANK HAS  A  CAPACITY OF 9000-5000  GALLONS AND IS MADE OF 30«

STAINLESS STEFL. A BLEED-OFF  SIHEAM FROM  THE RfcClRCHLATION  TANK  IS SENT  TO AN ON-SITE SFWAGE TREAT-

MENT PLANT WHFRE IT  HFCEIVES  PRIMARY CLARIFICATION AND  AERATION/STABILIZATION STABILIZATION FOR RED-

UCTION OF BTOI OR1CAL (IXYGEN DEMAND  (BOD).

    RFFFR TO FIRIlRF  1O-0?  IN  Sf-CTIUN  la Fflfc  A  f.FIAHEn  PrtncFSS FLOW  OIARRAM (IF THIS SYSTEM.
                                                HO

-------
                                                                             STATUS TO JAWIAHY
                                      SECTION  <»  (CONTINUED)
             PERFORMANCE DESCRIPTION FUR OPFkAT IllfcAl FGO SYSTFf.S ON  rNDUSTRTAI ROTLF.RS
ST. RE6J3 PAPER CO.? CANTONMENT, FLORIDA (CONTINUED)
                                         OPERATING HISTORY
3RD QUARTER-1977    WOOD FIBERS FROM BARK HERE CLOGGING SEPARATORS AND CONTROL VALVES.   INSPECTION
HAS HADE AND SOLUTION TO PROBLEM WAS BEING  INVESTIGATED.

ATM QUARTER-1977    AFTER INVESTIGATION OF  THE CLOGGING PROBLEM  IT WAS DECIDED To CHANGE  THF  h-AKF-IIP
HATER SOURCE.  WATER IS NOW OBTAINED FROM A CLEANER  PORTION OF THE PROCESS LOOP.  PLANT  REPORTS
SATISFACTORY OPERATIONS *»ITH NO OTHER MAJOR PROBLEMS.

2ND QUARTER-1
-------
                                                                             STATUS  TO  JANUARY  t<»79

                                            N  9 (CONTINUED)

             PK»FORM»NCF DESCRIPTION POM OPtH AT TOtfAL FGf> SYSTFMS ON  INDUSTRIAL BOILERS
  INSTALLATIMN NAMF

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING
  NUMBER  HF SEPARATE FGO UNITS

  NUMBER  OF BOILERS BEING CONTROLLED

  SOURCE  CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEK  / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  802  REMOVAL EFFICIENCY

  SLUDGE  OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
TFXACO INri)RPn»»TEI>

SAN •RPO, CALIFORNIA

OIL (1.7X SULFUR)

3ftO,UQO SCFM (TOTAL - 32 BOILERS)

24,000 ACFM a 600 F, FOR EACH OF 25 F6D SYSTFMS

70,000 ACFM a 600 F, FOR EACH OF 2 FGD SYSTEMS

10,000 ACFM a hOO F, FOR EACH OF 5 SYSTEMS

3?

32

!00 MW (F.QUIVALENT) ; 710 MM BTU/HRS TOTAL- 12 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE* 2000 SCFM =  1 EQUIVALENT  HK.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  MODULE  SIZING.)

CEILCOTE

SODIUM HYDROXIDE SCRUBBING

RETROFIT

NOVEMBER, 1973

OPERATIONAL

731 (1000 PPM a INLET)

WASTEMATER TREATMENT

HALF OF THE SCRUBBER UNDERFLOW IS TREATED AND RECYCLED  AS

BOILER FEFDWATER; THE OTHER HALF GOES TO WASTEWATER

DISPOSAL WELLS.

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION

    TEXACO IISFS SEVERAL OTL-FIRF0 BOILERS AT THE SAN  ARnfl, CALIFORNIA  SITE.   THE  STEAM IS INJECTED

INTO OIL WELLS TO FACILITATE OIL FLOW.  TH£RF ARE  THREE DIFFERENT  SIZES  OF  THE  BOILERS:  2 a 180 MM

BTU/HR, AND 25 a 50 MM BTU/HR, AND 5 3 30 MM BTU/HR.   THE FUEL  OIL HAS A TYPICAL  SULFER  CONTENT OF

1.7X.

    THE FLUE GASES (70,000 ACFM FROM THE LARGE, 34,000 ACFM FROM THE  INTERMEDIATE*  AND 10,000 ACFM

FROM THE SMALL GENERATORS it 60O F) ARE SCRUBBED BY FGD SYSTEMS  SUPPLIED  BY  CEILtOTE COMPANY IN

NOVEMBER 1973.  EACH BOILER IS FOLLOWED BY A OUENCHTNG CHAMBER  AND A  SCRUBBFR.  THE SCRUBBERS, WHICH

ARE HORIZONTAL TOWERS PACKED WITH 2 IN. TELLERITE  PACKINGS, ARE OF SIZES:  15  FT X 20 FT  (2 UNITS),

7 FT X  8 FT X 12 FT C?5 UNITS), AND THF GAS FLOWS ACROSS THE HORIZONTAL SCRUBBER WHEREAS

THE LIQUID TS SPRAYED PRIMARILY IN A CROSS-CURRENT MOOE.  THE ABSORBER SECTION  IS FOLLOWED BY A

SHORTER PACKEO DEPTH WHICH SERVES AS A MIST ELIMINATOR (M-E).   THE SCRUBBING  LIQUOR IS A MIXTURE

OF NATURAL WATER AND Sill NAOH SOLUTION.  THE TYPICAL  LIQUID MASS FLUX  VALUES  ARE  2000 -  3000

LBS/HR FT?.  A I/G RATIO flF 14 fJAI/1000 SCF IS I1SFO AND PH AT THE  INLET  IS  8.0.  THE FLUE GASES
                                                11?

-------
                                                                              STATUS TO JAMIAttY l°7<»
                                       SFCTTO'j  Q (rniiTINUFO)
                     NI F Of SCRIPT M.'I  HIP r>HFW41Tl)NA|  FGI» SYSfFiS nu T.OilSTKIii
TEXACO INCORPORATED: SAN mnit,  r»i IFORNIA
ENTFH THE QUENCHERS AT MjO F  H\ln  1000  PPM SO? AiJI) Lf.AVF TMF M-F'S AT IhO F -1ITH ?70 PPM SO?.  THE
SPFNT LIOUOR IS SPLIT INTO Two  STREAMS,  ONE RFCYCLF.D AS BOILER FEFO HATER AFTER KEMOVIIxR FLYASH AND
'SOFTENING, THE OTHER ts OTSPUSF.D OF  IN  WASTE-WATER OISPOSAL WELLS.
    THE ARSOHBEB MODULES, I>0*»PSTKFAM DUCTWORK, STACK AND THE T.O. FAN ARE MADF OF F»P, &HFREAS THE
PACKING IS POLYPROPYLENE.  THE  QUFNCHFU SECTION IS 31* SS, WHFRFAS THE SPFNT LtOllOR PIP1NC, CAUSTIC
TANKS, *NO THE CAUSTIC FEED LINES  ARE HJLD STEEL.
    RFFFR TO FimiRE 19-aa IN  SECTION 10 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.
                                          OPERATING HISTORY
THE MAJOR OPERATIONAL PROBLEM  AREAS  ARE:
   1. THE UUENCHER SECTION HAS SUFFERED SEVERE CORKOSION DUE TO ACIO ATTACK.
   S. FRP LTNF.R DETERIORATES DUE  TO  MECHANICAL ABRASION DURING CLE  ING OPERATIONS.  IT NEEDS
      OCCASIONAL RESURFACING.
   J. THE PACKED BpDS ARE FREQUENTLY PLUGGED BY FLYASH.  THE OIL IN THE NATURAL LIQUOR HAS CAUSED
      FOULING OF THE PACKED BEDS.
   a. OCCASIONAL OVERINIECTTON OF  CAUSTIC HAS RESULTED IN PLUGGING OF SPRAY NOZZLES BY SCALE.

1ST QUAHTEH-197H    DUE  m THE LOrt S02  REMOVAL AND HIGH MAINTENANCE COST OF THE ABOVE DESIGN, TEXACO
HAS UNDERTAKEN A TEST PROGRAM  WHICH, IF SUCCESFUL, WILL PHASE UIIT THE PRESENT SCRUBBERS BY THE END
OF 1979.  FOR MORE INFORMATION ON  THE PROGRAM SEE THE OTHER TEXACO, SAN ARDO BACKGROUND INFORMATION
ENTRY IN SECTION 10 OF THIS REPORT.

3ND QUARTER- 147 A    THE  AVAILABILITY OF EACH F6D SYSTEM WAS APPROXIMATELY 9«X.  ON AN AVERAGE, ONE
SYSTEM HAS SHUTDOWN TWO  OATS A MONTH FOR  MAINTENANCE.

3RD 01IARTFR-1978    THERE MAS  NO MAJOR  DOWNTIME DUE TO EQUIPMENT OR PROCESS FAILURE.  THE SCRUBBERS
XERE DOWN FOR SCHEDULED  MAINTENANCE  FOR ABOUT 8 HOURS P=R MONTH REOUIRING ABOUT 24-MAN-HOURS PER
UNIT.  GENERALLY DURING  THIS REGULAR MAINTENANCE PFRIOO THE PACKING IS REPLACED AND THE INTERNALS
INSPECTED AW CLEANED.   TFXACO IS  CONSIDERING CONVERTING FROM NAOH TO NA2C03 AS THE REAGENT.  NO
TIMETABLE MAS BEEN ESTABLISHED FOR SUCH A  TRANSITION.

«TH QIIARTER-197S    OPERATIONAL PROBLEMS  OF  CORROSION IN THE OUENCHER,  AND ABRASION AND PLUGGING IN
*BSORBER CONTINUED.  THE ABSORBERS ARE  MOUNTED ATOP THE GENERATORS WITH ONLY i  OR z FT  CLEARANCE.
HENCE,  THF HEAI LOSSES FROM THE RADIATION  SECTION WEAKfN THF FHP SHELL  OF THE ABSORBERS.   IN THIS
     ER, EACH SCRUBBER WAS SHUT DOWN FOR  MAINTENANCE FOR AN AVERAGE TIME OF 100 HOUBS.

-------
                                                                              ST47US TO JANIIAHY  IP7<)

                                      SfCTION   9  (CONTINUED!

             pfQFMRMiNCF DESCRIPTION FOR  OPERATIONAL  FOn SYSTEMS ON fNOUSTHTAI  BOTLFHS
  INSTALLATION NAME

  INSTALLAtlON LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING



  NUMBER OF SEPARATE F60 UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY
  CONTROL SYSTEM

  CONTROL PROCESS

  NEK / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  S02 REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  SLUDGE OR BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
TEXASGllLF

GRANGER, WYOMING

COAL (0.751 SULFUR)

140,000 SCFM (TOTAL - 2 BOILERS)

600,000 LB/HR STEAM (TOTAL)
70 M* (EQUIVALENT); TOTAL - 2 BOILERS

(FOR THIS REPORT, UNLESS STATED  OTHERWISE,  2000 SCFM = J EQUIVALENT M*.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

SWEMCO INC.

SODIUM CARBONATE SCRUBBING

NEW

SEPTEMBER. 1976

OPERATIONAL

90S (860 PPM 9 INLET)

99.31 (HOT-SIDE ESP W/PRECEDING  MECHANICAL  COLLECTOR)

WASTEHATER TREATMENT

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION

    TEXASGULF INC. HAS 1EEN OPERATING A NEW  SODA  ASH  PLANT  (1 MM TONS/YR) AT GRANGER, WYOMING, SINCE

SEPTEMBER 1976.  THO BUTLERS GENERATE A TOTAL  OF  600,000  LBS/HR SATURATED STEAM a 300 PSIG.

UNIT EFFICIENCY IS 85X WHEN BURNING WYOMING  SUB-BITUMINOUS  COAL, WHICH MAS 13.97X MOISTURE, 6.43X

ASH, 0.751 SULFUR, ANO A HEATING VALUE OF  IS 10,424 BTU/LP  ON AN AS-RECEIVED BASIS.  F.ACH BOILER

BURNS APPROXIMATELY a5,000 LB/HR OF THE COAL.

    AFTER FLUE GASES LEAVE EACH BOILER, (196,150  ACFM a 350 F) THEY PASS THROUGH A MECHANICAL

COLLECTOR, FSP, FFI1NOMIZFR, AND WFT SCRUBBER.   fTHF FCONOMJ7FR TS LOCATED AFTFR THE PRFCIPITATER

BECAUSE THE ASH FROM WESTERN CUAL  IS COLLECTED M|)MF EFFICIENTLY MHEN THE GAS IS HOT).  THE CYCLONE

ANO ESP TOGETHER HAVE A PARTICULATE REMOVAL  EFFICIENCY  OF 99.3X.  THE SCRUBBING UNITS, INSTALLED AT

DOWNSTREAM OF THE ECONO^i/tR, WERE SUPPLIED  HY SflEMCO IN  SEPTEMBER 1976.  THE SYSTEM CONSISTS OF

A QUENCHER, A SIEVE TRAY AHSORBFH  (15 FT OIA X 20.5 FT  HIGH)  AND A BYPASS.  THE ENGINEERING "ORK

WAS DONE BY «.G. MCKEF * CO.  FLUE GAS  IS  SPRAY-COOLED  FKOM 350 F TO 125 F AS IT ENTERS THE

QUENCHER «!TH 19 PVC NOZZLES ON FIBERGLASS HEADERS AND  IS DIRECTED INTO THE CIRCULATING LIOIIOR

IN THF RES*Wvni».  tHfi G»8 nilHULFS UP THROUGH  IHg  LII1UIIR, ENTERS THE ADJACENT AHSOHBER, TRAVELS

UP THBO'IGH T»0 MFVE TK»»S,, AND A  MESH  TYPf  MIST  ELIMINATOR OF TEFLON AT THF TOP.  SCRUBBING

uioiioR (700 PPM to IMF ARSMBHFR, *oo GPM TO  THF CJIIENCHER) is •JECIRCIH.ATFO FPO« THE SCRUBBER PUMP

TANK WHICH RFTf-lVfS l>'t SC*iMBf.H FFFLUFNT  (1P?3 f,P").  CM V»LOE tS MAINTAINED AT h.3.  A
                                                1 14

-------
                                                                             STATUS TO JANUARY 1979
                                      SECTION  9  (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPFRATIONAI FGn SYSTEMS ON  INDUSTRIAL HOTLFWS
TEXASGULFj GRANGER, WYOMING (CONTINUED)

BLEED-OFF (850 TO «87 LB/MIN) CONTAINING «X OF SODIUM SALTS  IS PURGED TO A MOLDING PONfl FOK EVAPORA-
TION.  THE CLARIFIED MAKEUP HATER  (60 TO 93 GPM)  IS USED FOR M-E WASHING (15 GPM) AND QUENCHER SPRAY
(45 TO 66 6PM).  MAKEUP SODA ASH 301 BY HEIGHT,  ISFEO FROM A LIQUOR  HEAD TANK TO THE SCHUB9FR PUMP
TANK AT A MINIMUM RATE OF 56 LB/MIN AND MAX. RATE OF 119 LB/MIN.
    EACH ABSORBER IS OIV-IOEf) VERTICALLY INTO TWO  SECTIONS, ONE OF WHICH HAS A DAMPER AT THE TOP.
THIS PERMITS CURTAILMENT OF GAS FLO* THROUGH HALF OF THE UNITS AT LOH LOADS.  THE ABSORBER,
THEREFORE. CAN OPERATE AT THE DESIGN EFFICIENCY  WHEN THE BOILER PRODUCES FROM 25)t TO 1001 OF ITS
RATED OUTPUT.  THE ABSORBER BYPASS ALLOWS UP TO  351 OF THF INCOMING  HOT FLUE GAS TO BE DIVERTED.
TTP1CALL»» TEXASGULF USES THE BYPASS TO KEEP THE  FLUE GAS IN THE STACK  10 F WARMER THAN THAT AT THE
SCRUBBER OUTLET.  THE ABSORBERS ARE MADE OF CARBON  STEEL WITH FLAKED GLASS LINING AND THE TRAYS ARE
OF INCONEL 6ZS.  THE RECIRCULATION TANKS ARE MADE OF FRP AND THE STACK  (7.5 FT 10 X 150 FT HEIGHT)
18 DOUBLE*ALLEO, INSULATED STEEL TYPE WITH FLAKED GLASS COATING BY CEILCOTE COMPANY.
    REFER TO FIGURE i«-as IN SECTION in FOR A DETAILED PROCESS FLOW  DIAGRAM OF THIS SYSTEM.

                                        OPERATING HISTORY
    THE THROAT IN ONE OF THE QUENCHERS WAS REPLACED BY THAT  OF INCONEL  625 BECAUSE OF CORROSION
PROBLEMS.

1ST OUARTER-1978    THE OUTLET DUCTWORK, WHICH WAS  CORRODED  DUE TO THE  ACID CONDENSATE, WAS TO BE
REPLACED.  THE SYSTEM OPERATED WITHOUT ANY MAJOR  PROBLEMS.

2*0 OUARTER-19T8    DURING A MAJOR ELECTRICAL TURNAROUND, THE SCRUBBER  MODULES WFRE CLEANED AND
REPAIRED, SLUDGE FROM THE TRAYS WAS REMOVED AND  THE OUTLET DUCTWORK  WAS REPLACED BY 30a SS.  THE S03
MEASURING INSTRUMENTS MERE BEING UPGRADED BY LEAR SIEGLER, THE SUPPLIER.

3RD OUAHTER-1978    DURING THE REPORT PERIOD, THE BOILER AND F6D SYSTEM WERE DOWN TWICE FOR
SCHEDULED INSPECTION OUTAGES.  DOWNTIME HAS « DAYS FOR ONE MODULE AND Z DAYS FOR THE OTHER.  SOME
MINOR PLUGGING WAS OBSERVED DURING THE INSPECTION PERIODS.

«TH QUARTER-1978    DURING THIS PERIOD, OUTAGE OCCURRED ON NO. 3 BOILER FOR A DAY IN OCTOBER.  IN
NOVEMBER, THE NO. 2 BOILER WAS DOWN FOR SCHEDULED INSPECTION FOR 3.5 DAYS.  DURING THIS TIME, THE
TRAYS AND INTERIOR OF THE SCRUBBER WERE CLEANED.  SOME OF THE PIPING LEADING TO TRAYS WAS REPLACED.
SOHE OF THE PLUGGED NOZZLES IN THE QUENCHER HERE  EITHFR CLEANED OR REPLACED.  THE RELIABILITY IMDF.X
VALUE FOR BOTH SCRUBBERS WAS ABOUT IOOX.
                                               115

-------
                                                                             STAtl'S TO JANUARY  1979

                                            SECTION 10

            (tFSTGN INFORMATION FOR UNDER CONSTRUCTION FC-0 SYSTEMS ON TNOUSrRIAL BOILERS
  INSTALLATION NAMF

  INSTALLATION LOCATION

  SOURCE  CHARACTERISTICS

  SOURCE  RATING



  NUMBER  OF SEPARATE FGO UNITS

  NUMBER  OF BOILFBS  BFING CONTROLLED

  SOURCE  CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW  / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  S02  REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  SLUDGE  OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
ARCO/POLYMFRS, INC.

MONACA, PENNSYLVANIA

COAL (3. OX SULFUR)

236,000 SCF«  (TOTAL - 3 BOILERS)

900, 000 LR/HR STEAM a 700 PSIG AND 700 F.
118 MW (EQUIVALENT); TOTAL - 3 BOILF.RS

(FOR THIS REPORT, UNLESS STATED OTHERWISE' 2000 SCFM =  t EQUIVALENT MH.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  MODULE  SIZING.)

FMC ENVIRONMENTAL EQUIPMENT

DOUBLE ALKALI (CONCENTRATED)

RETROFIT

JUNE, 1980

CONSTRUCTION

901 (1,800 PPM 3 INLET)

99.51

DEWATERED SLURRY TO LANDFILL

FLYASH ADDITION TO OEWATERED CAS03/CASO« FILTER CAKE,

THEN TO LANDFILL.

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND INFORMATION

    ARCO/POLYMERS, RFAVER VALLEY PLANT LOCATED NEAR MONACA, PENNSYLVANIA,  AWARDED A CONTRACT

IN JUNE 197R TO FMC TO INSTALL THREE FOUR-STAGE DISC CONTACTOR SCRUBBERS.  THE SYSTEM

WILL UTILI7F THE FMC DOUBLE ALKALI PROCESS WITH THE SCRUBBERS SHARING  A COMMON REGENERATION UNIT.

    THREE BOILERS GENERATE PROCESS STEAM USED TO OPERATE A TURBINE WHICH GENERATES  18  TO  SO

KVA (CAPACITY 35 KVA).  tHfc STEAM RATE FUR EACH BOILER  IS 300,000 LB/HR a  700 PSIG  AND 700 F.

TOTAL HEAT INPUT IS 1100 MM BTU/HR.  PULVERIZED COAL (3.OX SULFUR) IS  THE  FUEL USED WITH  AN ASH

CONTENT OF 151.  IT HAS A HEAT VALUE OF 12,000 BTU/LB 3 4-bX MUISTUKE  CONTENT.   THE COST  FOR THE

COAL IS S8.84/TON.

    KDPPERS ESP'S PRECLF.AN THE FLUE GAS BEFORE IT ENTERS THE SCRUBB^S AT  A  RATE OF. 165,000 ACFM

(EACH) 3 400 F.  THE INLET CONCENTRATION OF PARTICULATES TO THE ESP  S  IS 5 GR/SCF.  GAS ENTERING  THE

SCRUBBERS WTLL HAVE AN SO? CUNCFNTRATION OF APPROXIMATELY 1800 PPM.  THE SCRUBBERS  117 FT D1A  X 62

FT  HEIGHT) WTTM 0 DISCS AND flflNUTS (FACH) WILL HI- CONSTRUCTED OF C  RBON STFEL WITH CEILCOTE LININGS

(FLAKED GLASS LINING) AND THE MIST ELIMINATORS (1 FOR EACH SCRUBBER' ARE SINGLE  STAGE  CHEVRON  PAD

TYPF CONSTRHCTFH flF PVC PIASTIC  WITH PROVISIONS FOR A SFCONO STAGE.  EACH  StRUBRFR  WILL EXHAUST

TO INDIVIDUAL  I1SOLMFO STACKS I INED WtTh FHP.  ASSOCIATED *ITH £AC  STACK IS A  REHEATF.R  USING
                                                116

-------
                                                                             STATUS TO JANUARf 1979




                                      SECTION  10  (CONTINUED)




            DESIGN INFORMATION FOR UNDER CUNSTKIICT ION FGO SYSTEMS ON  INDUSTRIAL HHILERS




ARCO/POLYMERS, INC.; MONACA, PENNSYLVANIA  (CONTINIJEn)






STEAM HEATEO AMBIENT AIR.  THE SCRUBBERS KILL  HANOLF  100* OF  THE FLUE GASES WITH BY-PASS ONLY




AVAILABLE FOR EMERGENCIES.  THE L/6 RATIO  FOR  THE  SCRUBBERS IS  APPROXIMATELY JO. THF HFSTINGHOUSE




F.O. FANS WILL BE OF CARSON STEEL AND PUMPS  OF RUBBFR-LTNEO CARBON  STEEL.  THE DUCTING LEADING  TO




AND FROM THE SCRUBBFRS i*ILL BE OF FIBERGLASS LINED (CEILCOTE) CARBON  STEEL AND FRP, RESPECTIVELY.




    CALCIUM SUtFATE HASTE WILL BE HAULED BY  TRUCK  TO  A DISPOSAL SITE.




     REFER TO FIGURE 14-3 IN SECTION  la FOR  A  DETAILED PROCESS  FLOM DIAGRAM OF THIS SYSTEM.








                                        OPERATING HISTORY




3RD SUARTER-19T8    CONSTRUCTION  IS TO BEGIN IN SEPTEMBER  1978.









4TH 8UABTER-197B    CONSTRUCTION  OF THE PLANNED FGD SYSTEM  STARTED  IN SEPTEMBER  1976.
                                                117

-------
                                                                             STATUS  TO JANUARY  1979

                                      SECTION 10 (CONTINUED!
            DESIGN INFORMATION FOR UNDER CONSTRUCTION FC.U SYSTEMS ON  INDUSTRIAL BOILERS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING

  NUMBER OF SEPARATE FGO UNTTS
  NUMBER OF BOILERS BEING CONTROLLED
  SOURCE CAPACITY
  CONTROL SYSTEM VENDOR

  CONTROL PROCESS
  NEW /  RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  302 REMOVAL EFFICIENCY
  MATER  MAKE-UP
  CONTROL SYSTEM COST
BELRIOGE OIL CO.
MCKITTRICK, CALIFORNIA

CRUDE OIL (I.IX SULFUR)
12,000 SCFM
20,000 ACFM H 570 F
 1
 1
5 MM (EOUIVALFNT)
SO MM BTU/HR
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM  =  1  EQUIVALENT  MH,
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  MODULE  SIZING.)

C-E NATCO
SODIUM HYDROXIDE SCRUB ING
RETROFIT

JANUARY, 1979
CONSTRUCTION
90* (500 PPM 802 9 I LET)
15 GPM
SEE SECTION It FOR '•' TAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
     BELRI06E OIL COMPANY HAS AN ENHANCED OIL RECOVERY SITE IN MCKITTRICK, CALIFORNIA.   THE  SITE IS
LOCATED IN HESTERN KERN COUNTY AND HAS SEVERAL SMALL STEAM GENERATORS RATED  AT  SO  AND 25 MH  BTU/HR.
THE CRUDE OIL HAS 1.1 PERCENT SULFUR CONTENT.
     IN VIEW OF THE NEW REGULATIONS OF THF CALIFORNIA AIR REi URCE  BOARD  (CARB), BELRIDGE HAS UNDER-
TAKEN A PROGRAM TO EVALUATE THE COMMERCIALLY AVAILABLE FGD TfHNOLOGY FOR  APPLICATIONS  TO A  SMALL
(TYPICALLY 50 MM BTU/HR) STEAM GENERATOR.  THEY HAVE ALREADY INSTALLED  TWO FGO  SYSTEMS  SUPPLIED BY
HEATER TECHNOLOGY AND THERMOTICS.  (SEE SECTION 9 OF THIS REPORT FOR DESCRIPTIONS  OF THESE SYSTEMS).
A THIRD SYSTEM, BEING SUPPLIED BY C-E NATCO, IS UNDER CONSTRUCTION.  C-E  NATCO,  A  SUBSIDIARY OF
COMBUSTION ENGINEERING, IS THE PRINCIPAL SUPPLIER OF THE STEAM GENERATORS  TO THE OIL FIELDS.  THE
FGD SYSTEM IS SCHEDULED TO GO ONSTREAM BY EARLY JANUARY  19/ .
     THE FLUE GAS (29,000 ACFM AT 570 F) IS QUENCHED RY  A  •-T OF SPRAYS IN THE  BOTTOM PART OF THE
ABSORBER (7 FEET OIA X J5 FEET HIGH).  THE QUENCHER SECTIO , HAS A SEPARATE RECIRCULATION PUMP
(300 GPM) HHICH ALSO BLEEDS OFF A PURGE STREAM  (10 GPM).  THE PH IN THIS  STAGE  IS  RANGFS FROM 6-6.5.
THE COOLED GAS PASSES THROUGH A 'CHIMNEY-TRAY"  (TRAY WITH ft CENTRAL OOWNCOMFH)  AND IS FURTHER CON-
TACTED WITH LIQUOR SPRAYS (PH BETWEEN 7.5-8.0).  THF ABSORPTION STAGE HAS  A  SEPARATE
RECIRC1ILATION PUMP MOU GPM) WHICH ALSO RECEIVES A CONTINUOUS STREAM OF FRESH SODIUM CARflONATF
SOLUTION (l"> GPM).   IHh FLIIF GAS PASSES THHOllRH A CHEVRON MIS! FLIMINAT,  ANf) A STUB SIAC* AT THE
                                                118.

-------
                                                                              STATUS TO JANUARY  1979




                                       SFCTION 1ft (C 'NTWIFnl




            DESIGN  INFORMATION FUR UMDt* CONSTRUCT? N FGD SYSTH4S (IN INIHiS TRIAL HlltlFBS




BELRIDGE OIL C0.» MCKITTRICK,  CALIFORNIA (CONTINUFO






TOP OF THE ABSORBER.




     THE ABSORBER,  TRAY,  RECIRCULATION PUMPS, PIPING, *ND STACK ARE MADE OF 316L ss.  THE




SODA ASH MIX TANK,  FEED. PUMP  AND PIPJNS ARE CAK80N ST F.L, AND THE MIST ELIMTNATOH  IS FRP.









                                           OPERATING HISTORY




«TH aUARTER-l<»78     THE  SYSTEM IS UNDER CONSTRUCTION ANO THE STARTUP DATE IS DELAYED TO  EARLY




JANUARY 1979 FROM NOVEMBER 1978.
                                                 119

-------
                                                                             STATUS TO JANUARY  1979


                                              10 (rnNTJMIFU)


            DFSTG*! INFIiHMATION FUH UNDER CONSTRUCT I ON FRO SYSItMS ON INDUSTRIAL HOILEPS
  INSTALLATION


  INSTALLATION


  SOURCE CHARACTERISTICS


  SOURCE RATING
  NUMBER OF SEPARATE FGO UNITS


  NUMBER OF BOILERS BEING CONTROLLED


  SOURCE CAPACITY






  CONTROL SYSTEM VENDOR


  CONTROL PROCESS


  NEK / RETROFIT


  START-UP DATE


  CONTROL SYSTEM STATUS


  S02 REMOVAL EFFICIENCY


  SLU06E OR BY-PRODUCT DISPOSAL




  CONTROL SYSTEM COST
CATFWPILLAR TRACTOR CO.


MAPLfTi)N, ILLINOIS


COAL (3.2Z SULFUR)


111,000 SCFM (TOTAL - 3 BOILERS)


80,000 ACFM a 350 F, FOR EACH OF 2 FGD SYSTEMS


40,000 ACFM St 350 F, FOR 1 FGO SYSTEM


600.000 LB/HR STEAM {TOTAL - 3 BOILERS)
65 Mh (EQUIVALENT); TOTAL - 3 BOILERS


(FQR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM r  1 EQUIVALENT HH.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  MODULE  SIZING.)


FMC ENVIRONMENTAL EOUIPMENT


DOUBLE ALKALI (CONCENTRATED)


NEW


JANUARY, 1979


CONSTRUCTION


90X (2000 PPM 9 INLET)


OEMATERED SLURRY TO LANDFILL


60+X SOLIDS (CAS04) SLUDGE DIRECTLY TO LANDFILL


SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION


     AT THE MAPLETON, ILLINOIS PLANT, CATERPILLAR TRACTOR IS INSTALLING FIVE NEH BOILERS, THREE OF


WHICH ARE SLATED TO BFGTN OPERATIONS DURING JANUARY 1979.  THE OTHER TWO WILL BEGIN OPERATIONS IN


THE EARLY I980'S.  BECAUSE CONSTRUCTION HAS NOT YET BEGUN ON THESE TMO FGD SYSTEMS THEY ARE REPORTED


IN SECTION 11 OF THIS REPORT.  TMO BOILERS STARTING IN JANUARY 1979 ARE RATED AT 250,000 LB/HR STEAM


EACH, THE OTHER IS RATED AT 100,000 LB/HR STEAM.  BOTH BOILERS STARTING IN THE EARLY 1980*3 HILL BE

1,100,000 LB/HR.


     CATERPILLAR HAS AWARDED A CONTRACT TO FMC ENVIRONMENTAL EOUIPMENT TO PROVIDE CONCENTRATED MODE


DUAL ALKALI FGD SYSTEMS FOR ALL FIVE BOILERS.  EACH BOILER HILL HAVF.A SEPARATE'FGD SYSTEM.  EACH


SY.STEM WILL INCLUDE A VENTURI SCRUBBER FOLLOWED BY A CYCLONIC MIST ELIMINATOR.


     FACILITIES FOR REGENERATION, SLUDGE HANDLING AND DISPOSAL WILL BE SHARED BY ALL FIVE BOILERS.
                                                                                                    *

THE SAME FACILITIES HAVF BEFN DESIGNED TO HANDLE A TOTAL OF EIGHT BOILERS.  THE ADDITIONAL CAPACITY


FOR THRFE BOILERS WAS PLANNED FOR PROBABLE PLANT EXPANSION IN THE FUTURE.  THFRE IS NO PLANNED


START-UP DATE FOR THESE THREE BOILERS.
                                                120

-------
                                                                               STATUS  f()  JANIIAWY



                                       SECTION  in  (CONTINUED)



            OFSIC.N  T"HHn;»T!(V'l F(i» IC'IIFW ri'VSThilCT l')l( l-Cli SYMf .«S 'I"  IMlliSIKI At.  HUlLf*



CATERPILLAR TUACTOH  CO.!  MAPLETON, ILLINOIS  (CON flNIIEn)






                                          OPFKATING  HISTOHY



3RD QIIARTEH-1977     SYSTEM MAS UNDER CONSTRUCTION.   START-UP WAS EXPF.CTFI) LATF  IN  THE  FALL OF 1977.






4TH OUARTFH-1977     CHNSTBllCTIdN DELAYS ON  THE  STFAH GENERATION SIDE  PUSHFO  PLANT  ST*RT-UP BACK TO




THE FALL flF 197B.






2ND OIURTER-1<»7»     START-UP HAS STILL PLANNED  FOR  THE 1978-197<» HEATING SEASON.  THHEE BOlLfRS AND



THEIM INDIVIDUAL FHC FGO  SYSTEMS WILL CtlMF  ON-LINF  AT THAT TIME.








3RD QUARTER-! 97R      CONSTRUCTION HAS NF.ARING  COHPLFTION.  SPECIAL MOD IF ICATIONS WF.RE  BEING MADE



HHICH WERE BELAYING  STA»T-UP.  EXPERIENCE GAINED  AT MflSSVILLF.  IS BEING  APPLIED  TO  MAPLETON SINCE THE




SYSTEMS ABE SIMILAR.






«TH QIIARTER-107H      DELAYS OF THP START-UP DATE  FOR THF THREE 80ILEHS  AND  THEIR RELATED FGD SYSTEMS



ACTIVITIES AND NOT  THE INSTALLATION OF SPFCTAL  MODIFICATIONS.  CONSTRUCTION  OF  THESE THREE BOILERS




HAS BEEN COMPLETED?  START-UP IS EXPECTED  AT THE END OF DECEMBER OR BEGINNING OF JANUARY.  INSTALLA-




TION HAS JUST HEGUN  ON THE OTHER TWO a-50,000 LB/HR  BOILERS.  START-UP FOR THESE TWO BOILERS WILL BE




IN THE EARLY 19flO*S.
                                                 121

-------
                                                                             STATUS TO JANUARY

                                      SECTION 10 (tONTtNUFOl

            DESIGN INFORMATION FDR UNDER fONSTKUCTION FRO SYSTEMS UN INDUSTRIAL BOILfKS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING
  NUMBER OF SEPARATE F60 UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEN / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  S02 REMOVAL EFFICIENCY

  MATCH WAKE-UP

  SLUOCC OR BY-PRODUCT DISPOSAL



  CONTROL SYSTEM COST
CHANSLOR WESTER* OIL * OEV. CO

BAKEkSFtELO. CALIFORNIA

OIL (1.5Z SULFUR)

70,000 SCFM (TOTAL - « BOILERS)

310 MM BTU/HR (TOTAL - 8 BOILERS)

133,400 ACFM 3 550 F (TOTAL - 8 BOILERS)

 1

 a

35 MK (EQUIVALENT); TOTAL - 8 STEAM GENERATORS

(FOR THIS REPORT, UNLESS STATED OTHERWISE. 8000 SCFM =  I EQUIVALENT MI,
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  MODULE  SIZING.)

FMC ENVIRONMENTAL EQUIPMENT

DOUBLE ALKALI (CONCENTRATED)

NEM

MARCH, 1979

CONSTRUCTION

9M (710 PPM a INLET)

71 6PM

OENATERFD SLURRY TO LANDFILL

SALTS IS THEREBY PREVENTED.

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                         OPERATING HISTORY

    CHANSLOR WESTERN OIL COMPANY HAS AN ENHANCED OIL RECOVERY SITE NEAR BAKER3FIELD, CALIFORNIA.

THE OIL PRODUCTION INVOLVES INJECTION OF STFAM IN THE OIL NELLS. OECANTATION OF OIL FROM OIL-MATER

MIXTURE, AND PURIFICATION OF OIL IF NECESSARY.  THE CRUDE OIL PRODUCED BY THIS PROCESS HAS APPROX-

IMATELY 1.51 SULFUR.  A PART OF THE OIL PRODUCED IS USED AS A FUEL FOR THE BOILERS NHICH 6ENERATF

THE NECESSARY PROCESS STEAM.  THERF ARE SFVERAl BOILERS ON THE SITE, MANY OF NHICH ARE RATED AT 50

MM BTU/MR.  THE BOILERS ARE CLASSIFIED AS "STEAM GENERATORS' BECAUSE OF THEIR SHE, PORTABLE NATURE,

AMD LOWER QUALITY OF STEAM (BOX) PRODUCFD.

    EISHT OF THE STFAM GENERATORS, MITH A TOTAL HEAT OUTPUT OF 310 MM BTU/HR, ARE BEING CONSTRUCTED

ALONG MITH A NEN, FMC DOUBLE-ALKALI (CONCENTRATED) FGD SYSTEM.  THE FLUE GASES FROM THE EIGHT STEAM

GENERATORS ARE MANIFOLDED TOGETHER U33.SOO ACFM 3 550 F), AND PASS THROUGH A PRE8ATURATOR AND AN

ABSORBER (IS* DIAMETER BY «' HIGH) MITH 4 OISC-AND-DONUT TRAYS.  THE RECIRCULATION LIOUOR PM IS

MAINTAINED AT b.S, AND A L/G RATIO IS USED.  THE FLUE GASES PASS THROUGH A CHEVRON MIST ELIMINATOR

TO .A STACK.  A CONSTANT BLEED-OFF STMEAM (60 6PM) IS TAKEN TO THE REACTION TANK WHERE IT REACTS HITH

LIMF SLURRY TO REGENERATE snoitw HYDROXIDE.  THE CALCIUM SULFTTE/SULFATE SLURRY is SENT TO THF

THTCKENFK, VACUUM FILTFR AMD -I ANOF U L.

-------
                                                                              STATUS TO JANUARY 1<»79




                                       SFCTION 10 (CONTINUED)




            DFSIGN INFORMATION  FOR  11NOE& CONSTRUCTION FBO SYSTF.MS ON TNOMSTPIAL KOILEHS




CHANSLOR WESTERN OIL  *  OEV.  COS  HAKERSFIELD,  CALIFORNIA (CONTINUED)






     REFER TO FI6UBF  10-11  IN SECTION JO FOR  A DETAILED PROCESS FLOW IHA6RAM OF THIS SYSTEM.









                                         OPERATING HISTORY




JRO OU»RTER-l478    THE PLANT  IS NEAHING COMPLETION OF CONSTRUCTION.  THE COMMtSIONINR ACTIVITIES




HILL BE UNDERWAY SOON.









«TH QUARTER-1<»78    CONSTRUCTION WORK HAS BEEN HELD UP PHIMAKILY DUE TO DELAYS IN SHIPKFNT OF




ELECTRIC CONNECTIONS  AND EQUIPMENT.
                                                 tas

-------
                                                                            STATUS  TO  JANUARY  1979

                                    Si-rilDN  10  (CONT INUFI))

                 INFORMATION ""OB UNDER CONSTRUCTION FRO SYSTEMS  UN  INDUSTRIAL  BOILERS
INSTALLATION NAME

INSTALLATION LOCATION

SOURCE CHARACTERISTICS

SOURCE RATING



NUMRER OF SEPARATE FGO UNITS

NUMBER OF BOILERS BFIN6 CONTROLLED

SOURCE CAPACITY
CONTROL SYSTEM VENDOR

CONTROL PROCESS

NEW / RETROFIT

START-UP OATE

CONTROL SYSTEM STATUS

SO? REMOVAL EFFICIENCY

PARTICIPATE REMOVAL EFFICIENCY

SLUDGE OR BY-PRODUCT DISPOSAL
CONTROL SYSTEM COST
GFTTY OIL COMPANY

BAKERSFIELO, CALIFORNIA

OIL (1.1X SULFUR)

39h,000 SCFM (TOTAL-36 BOILERS)

0 FGO SYSTEMS, EACH TREATING 300,000 ACFM a 500 F

 a

36

200 KW (EQUIVALENT)S 1800 MM BTU/HR (TOTAL-36 BOILERS)

EACH BOILER RATEO AT 42,000 LBS/HR STEAM

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 3000 SCFM =  1 EQUIVALENT MM,
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  MODULE  SIZING.)

IN-HOUSE DESIGN

SODIUM CARBONATE SCRUBBING

RETROFIT

JANUARY, 1979

CONSTRUCTION

96Z (600 PPM S02 9 INLET)

50Z 135 LB/HR ASH 3 INLET)

WASTEHATER TREATMENT AND DISCHARGE TO TAILINGS POND

HOLDING POND FOR EVAPORATION.

9 GPH BLEEDOFF TO A SLOWDOWN TANK.  THE SLOWDOWN IS EMPTIED

INTO A DISPOSAL POND ONCE A WEEK.

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                              120

-------
DFSIGN TNFllBMAttUN FUM
                                                                              STATUS TO JANUARY t<*79
                                       SFCTION 10 (CONTINUED)
                                          Cl'f»STklirT TPM FRO SYbUMS UN TNOuSTMAL
   INSTALLATION  NAME
   INSTALLATION  LOCATION
   SOURCE CHARACTERISTICS
   SOURCE RATING

   NUMBER OF  SEPARATE  FGO  UNITS
   NUMBER OF  BOILERS BEING CONTROLLED
   SOURCE CAPACITY

   CONTROL SYSTEM VENDOR
   CONTROL PROCESS
   NEW / RETROFIT
   START-UP DATE
   CONTROL SYSTEM STATUS
   302 REMOVAL EFFICIENCY
   MATER MAKE-HP
   SLUDGE OR  BY-PRODUCT  DISPOSAL

   CONTROL SYSTEM COST
                              MOBTI OTL COMPANY
                              RIITTONwHLO*, C
                              OIL  <1.U SULFUR)
                              BO,500 SCFM  (TOTAL - 7 BOILERS)
                              7 FGD SYSTEMS, FACH TREATING 23,000 ACFM 3 550F.
                               7
                               7
                              aO Ml* (EQUIVALENT); 350 MM 8TU/HR (TOTAL - 7 BOILERS)
                              (FOR THIS REPORT, UNLESS STATED OTHERWISE* 3000 SCFM = ! EQUIVALENT l>
                              THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.
                              HFATER TFCHNOLORY
                              SODIUM CARBONATE SCRUBBING
                              RETROFIT
                              FFBRUARY, 1979
                              CONSTRUCTION
                              851  (500 PPM 3 INLET)
                              15 GPMj OIL FIELD WASTE WATER
                              HOLDING POND FOR EVAPORATION
                              INTERMITTENT SLOWDOWN TO WASTE DISPOSAL SITE.
                              SFE SECTION IS FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND INFORMATION
    MOBIL OTL COMPANY  HAS  AN  ENHANCED OIL  RECOVERY SITE AT RUTTONWILLOW,  CALIFORNIA.   THE
OPERATION REQUIRES PROCESS STEAM  WHICH IS  SUPPLIED BY  SEVERAL STEAM GENERATIONS  RATED  AT 50  MM
BTU/HR.  MOBIL HAS BEEN OPERATING SEVERAL  FGD  SYSTEMS  AT THE  SAN  ARDO  OIL SITE SINCE 197«.   (SEE
SECTION 9 OF THIS REPORT FOR  DETAILS  ON THESE  SYSTEMS).
    HEATER TECHNOLOGY  HAS  RETROFITTED 7 FGD  SYSTEMS AT BUTTONWILLOW IN OCTOBER,  t978.  EACH  SYSTEM
TREATS FLUF GAS FROM ONE GENERATOR (23,000 ACFM  3 550  F).   THE PROCESS USED  IS SODIUM  CARBONATE
SCRUBBING.  THE SYSTFM INCLUDES AN EDUCTOR-ABSORBER, A RECYCLE TANK, A WJST  El IMINATOR. AND  A STUB
STACK.  THE EOUCTOR HAS AN ADJUSTABLE DISK WHICH FORMS THE CONTACT  STAGE  FOR THE GAS AND RECIRCULAT-
IN6 LIQUOR.  THE RECIRCULATION PH IS  SET AT  ABOUT 8.0  AND  A L/G RATIO  OF  40  GAL/1000 ACF IS  USED.
FRESH SODIUM CARBONATE SOLUTION IS ADDED TO  THE  RECYCLE TANK  (15  RPM),  AND A BLEED-OFF STEAM IS
TAKFN TO HOLDING POND  (10  6PM).
    THE PDUCTOR, CONTACTING DISC,  HFCICULATTON PIPING  AND  THE  PUMP  ARE  MADE  OF 316 SS.  THE  RECYCLE
TANK IS CARBON STEFL WITH  EPOXY TAR COATING  AND  THE CHEVRON-TYPE  MIST  ELIMINATOR IS FRP.
    REFER TO FIGURE 11-35  IN  SECTION  i« FOR  A DETAILED PROCESS FLOW DIAGRAM  OF THIS SYSTEM.
                                               125

-------
                                                                              STATUS TO JANUARY 1979




                                       SFCTION  10  (CONTINUFO)




            DESISN INFORMATION FOR UNDER  CONSTRUCTION  FGD  SYSTEMS ON INDUSTRIAL BOILHKS




MOBIL OIL COMPtNY: BUTTONHILLOW, CALIFORNIA  (CONTINUED)






                                        OPERATING  HISTORY




*TH OUARTeR-l«»T8    THE START-UP DATE  HAS BFEN FXTENDF.D  TO FEBRUARY OF 1979, OUE TO OELAVS IN




AWARDING SEPARATE CONTRACTS FOR PIPING AND OTHER WORK.
                                                126

-------
                                                                              STATUS  TO  JANUARY  1979
                                       SFCTION 10 (CONTINUED)
            DESIGN  INFORMATION  FOR UNDER CONSTRUCTION FRO SYSTEMS  ON INDUSTRIAL  BOREHS
  INSTALLATION  NAME
  INSTALLATION  LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING

  NUMBER OF SEPARATE  FGD  UNITS
  NUMBER OF BOILERS BEING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  MEN / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  308 REMOVAL EFFICIENCY
  CONTROL SYSTEM COST
PHILLIP MORRIS,. INC.
CHESTERFIELD, VIRGINIA
COAL

39,000 SCFM (TOTAL - 1 BOILER)
55,000 ACFM a 350F, 300,000 L8/HR STEAM
 I

 1

30 M* (EQUIVALENT); 337 MM BTU/MR

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = \  EQUIVALENT MW.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
FLAKT, INC.

SODIUM CARBONATE SCRUBBING
NEW
JUNE, 1979

CONSTRUCTION
90S (DESIGN MINIMUM)

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND  INFORMATION
     PHILIP MORRIS, INC.  IS CURRENTLY  EXPANDING  THEIR  TOBACCO REPROCESSING  PLANT  AT CHESTERFIELD,
VIRGINIA.  THE PLANT EXPANSION,  WHICH  IS  BEING HANDLED BY  AUSTIN  PROCESSES,  INC.,  INCLUDES  THE
ADDITION OF A 337 MM RTU/HR BABCOCK  AND WILCOX PULVERIZED  COAL-FIRED  BOILER  AND AN EMISSIONS CONTROL
SYSTEM FROM FLAKT, INC.   THE BOILER  FLUE  GAS  (88,900 ACFM  9  350 F)  WILL  FIRST  PASS THROUGH  A COLO-
SIDE ESP WITH A GUARANTEED MINIMUM COLLECTION EFFICIENCY OF  99.6*.  THE  FGD  SYSTEM IS DESIGNED TO
HANDLE THO-TMIROS OF THE  GAS DISCHARGED FROM THE PRECIPITATOR WITH  A  MINIMUM soa  REMOVAL EFFICIENCY
OF 90t.  THE REMAINING ONE-THIRD OF  THE GAS WILL BE USED FOR REHEAT.
     FLUE GASES ENTERING  THE SCRUBBER  ARE FIRST  COOLED AND SATURATED  IN  A PREOUENCHER BY A  6 6PM
SPRAY OF FRESH HATER.  THE ABSORBER  ITSELF IS A  3-STAGE SPRAY TOWER (9 FT. DIA. X  35 FT. HIGH)
UTILIZING SODIUM CARBONATE SCRUBBING AND  OPERATING AT  130  F  WITH  AN L/G  RATIO  OF  18 GAL/ACF.  THE
DESIGN IN'.ET PH IS 7.5.   PRESSURE DROP  ACROSS THE SCRUBBER IS EXPECTED TO BE ABOUT 3.5 IN.  B.C.
FOLLOWING THE ABSORBER THE FLUE  GASES FLOW THROUGH A 3-PASS  CHEVRON MIST ELIMINATOR BEFORE  JOINING
WITH THE REHEAT GAS IN A  MIX CHAMBER.   THE STACK IS DUAL-WALL CORTEN  STEEL-LINED,  5.5 FT.
IN DIAMETER X IBS FT. HIGH.  A BLEED STREAM OF 5 - H  GPM  IS TAKEN FROM  THE  RECIRCULATION LINE JUST
DOWNSTREAM OF THE PUMP.   THIS STREAM, WITH A PH  OF ABOUT 6.5,  GOES TO AN AERATION  TANK WHERE ANY
SULFITE IS CONVERTED TO SULFATE.  FINAL DISPOSAL OF THE SODIUM SULFATE SLUDGE  HAS  NOT BEEN  DETER-
MINED, AS PHILIP MORRIS PLANS TO EXPERIMENT WITH VARIOUS METHODS.  MAKE-UP SODIUM CARBONATE SOLUTION
IS ADDED IN THE RECTRCULATION LTNF JUST DOWNSTREAM OF  THE  HLEEDOFF.   THE MAKE-UP SOLUTION IS
STORED IN A CARBON STEEL  SODA ASH MIX TANK, 13 Fl. IN  OIAMfTER X 33 FT. HIGH.  THF SPRAY TOWER IS
                                               137

-------
                                                                              STATUS TO JAfcUAKY 1979
                                      SECTION  10  (CONTINUFD!
            DFStGN INFORWTION FOR IINnEU CONSTRUCTION FBI) SYSTEMS  ON  INDUSTRIAL BOILF.R5
PHtLLIP MORRIS, INC.; CHESTERFlFLfl, VIRGINIA (CONT INUF.O)

MADE OF FRP AND THE NOZ7LF.S (b PER STAGE) ARE  316  STAINLESS STEEL..   ALL PUMPS ARE RUBBER-LINED.
RECIRCULATION LINFS ARE 316 SS ANfl THE MIST ELIMINATOR  IS POLYPROPYLENE.
    REFER TO FIGURE l«-38 IN SECTION iq FOR A  DETAILED  PROCESS FLOW OTA6RAM OF THIS SYSTEM.

-------
                                                                              STATUS  TO JANUARY  1<»7<)
                                       SECTION 10 (CONTINUED)
             OFSI6N INFORMATION FOR UNOfR CONSTRUCTION FGO SYSTEMS ON INDUSTRIAL  BOILERS

   INSTALLATION  NAME                        ST. JOE ZINC CO.
   INSTALLATION  LOCATION                    MONAC&, PENNSYLVANIA
   SOURCE CHARACTERISTICS                   COAL (2.51 - *.5l SULFUR)
   SOURCE RATING                           182,000 SCFM (TOTAL  - I BOILER)
   NUMBER OF  SEPARATE  FGO  UNITS             1
   NUMBER OF  BOILERS BEING CONTROLLED       1
   SOURCE CAPACITY                          60  Mw (ELF.CTRIC POWER:  NOMINAL  PEAK CAPACITY)
                                           (FOR THIS RF.PORT, UNLESS STATED  OTHERWISE.  2000  SCFM  =  1 EQUIVALENT  M»
                                           THIS IS BECAUSE GAS  FLOW RATE  IS THF PRIMARY FACTOR  IN  MODULE  SIZING.)
   CONTROL SYSTEM VENDOR                    BUREAU OF MINES
   CONTROL PROCESS                          CITRATE PROCESS
   NEW / RETROFIT                           RETROFIT
   START-UP DATE                           MARCH, 1979
   CONTROL SYSTEM STATUS                    CONSTRUCTION
   802 REMOVAL EFFICIENCY                   90»X
   SLUDGE OR  BY-PRODUCT DISPOSAL            REGENERABLE - ELEMENTAL SULFUR PRODUCT
   CONTROL SYSTEM COST                      SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION

                                       BACKGROUND INFORMATION
    IN THE SUMMER  OF  1977, CONSTRUCTION  BEGAN AT MONACA,  PA. ON A CITRATE  PROCESS  (BUREAU OF MINES)
FGD SYSTEM FOR  ONE OF THE TNO  60-MH (NOMINAL  PEAK CAPACITY) BOILERS  OF THE GEORGE  F.  HEATON POWER
PLANT USED BY ST.  JOE ZINC CO.  TO  GENERATE ELECTRICITY FOR A ZINC SMELTER.  ST.  JOE HAS A RECIPROCAL
AGREEMENT WITH  THE LOCAL  UTILITY COMPANY,  DUQUESNE LIGHT, WHEREBY ST.  JOE  CAN SELL UP TO 25-MW  Of
ITS TOTAL 120-MW CAPACITY TO DUQUESNE.   IN RETURN,  ST. JOE CAN BUY SUFFICIENT POWER TO  MAINTAIN
ELECTRO-SMELTING OPERATIONS IN  THE EVENT OF AN EMERGENCY.  THIS FGD  SYSTEM IS THE  FIRST SMALL COM-
MERCIAL SIZE EXPERIMENTAL CITRATE  CONTROL  SYSTEM BEING BUILT FOR  REMOVING  SULFUR DIOXIDE FROM
COAL-FIRED POWER PLANT STACK GAS.
    UNDER A  S1Z.7 MILLION COST-SHARING AGREEMENT BETWEEN  THE BUREAU  AND ST.  JOE, COSTS  FOR TESTING
THE CITRATE  PROCESS FOR A FULL YEAR  ARE  BFIN6 SHARED  ABOUT SO-50.  THE CITRATE PROCESS  WAS DEVELOPED
BY THE BUREAU IN THE I960's TO HELP  CURB  SULFUR  DIOXIDE EMISSIONS  FROM BASE  METAL SMELTERS.
    THE CITRATE PROCESS DERIVES ITS  NAME FROM THE WATER SOLUTION  OF  SODIUM CITRATE AND  CITRIC ACID
USED AS A BUFFERING AGENT DURING SOS ABSORPTION  FROM  THE  FLUE  GAS.   THE CITRATE PROCESS IS DESIGNED
TO TREAT 230,000 ACFM it 300 F FLUE GAS GENERATED BY FIRING PULVERIZED COAL POSSESSING 2.5-0.5X
SULFUR,  151  ASH AND AN HHV OF APPROXIMATELY 12,500  BTU/LB.  THE PLANT WILL MEET THE PENNSYLVANIA AIR
QUALITY REGULATION OF 0.695 LBS OF 302 PER  MILLION  BTU HEAT INPUT  TO THE BOILER.
    THE DEMONSTRATION PLANT, DESIGNED WITH  A  60S  TURNDOWN  RATIO, UTILIZES A  SINGLE PROCESS TRAIN
CONSISTINR OF GAS COOLING AND 802  ABSORPTION,  SULFUR  PRECIPITATION,  SULFUR RECOVERY,  SODIUM SULFATE
REMOVAL, AND H2S GENERATION UNIT OPERATIONS.   FLUE  GAS FROM AN EXISTING PRECIPITATOR  ENTERS AN
                                               129

-------
                                                                             STATUS TO JANUARY  1<>79




                                      SECTION 10 (CONTINUED)




            DESIGN INFORMATION FOR UNDER CONSTRUCTION FRO SYSTEMS ON INDUSTRIAL BOILERS




3T. JOE ZINC CO.; MONACA, PENNSYLVANIA (CONTINUED)






EOUCTOR TYPE VENTURI SCRUBBER, THROUGH AN P.O. FAN WHERE IT IS COOLED FROM 300 F TO 130 F BY BOTH




HUNIDIFICATION AND SENSIBLE COOLING.  A BLEED STREAK IS TAKEN FROM THE VENTURI RECYCLE STREAM  TO




PREVENT BUILD-UP OF ASH AND ACIDS.  THIS STREAM FLOWS THROUGH A PACKED COLUMN COUNTERCURRENT TO A




STREAK OF AIR WHERE 802 IS STRIPPED FROM THE LIQUID AND RECYCLED TO THE SCRUBBER.  THE STRIPPED




LIQUID IS DISCHARGED TO AN AGITATOR TANK WHERE IT IS NEUTRALIZED WITH LIME.  FROM THERE- IT IS  PUMP-




ED TO THE EXISTING ASH POND.




    THE COOLED, CLEANED FLUE GAS THEN ENTERS A PACKED ABSORBER (26 FT OIA X 85 FT HIGH) MADE OF




FLAKE-GLASS LINED, CARBON STEEL, WHERE IT FLOWS UPWARD COUNTERCURRENT TO THE DESCENDING CITRATE




SOLUTION.  MORE THAN <»0t OF THE 802 IS REMOVED FROM THE FLUE GAS, MAINLY AS SULFUROUS ACID, IN  THE




PRESENCE OF THE CITRATE BUFFER SOLUTION.  CITRATE SOLUTION LEAVING THE ABSORBER FLOWS IN SERIES




THROUGH TWO TANOEM REACTORS IN THE SULFUR RECOVERY SECTION.  THE CITRATE RECYCLE STREAM FROM THE




REGENERATION SECTION IS COOLED FROM 131 F TO 123 F BY HEAT EXCHANGE WITH RIVER WATER BEFORE ENTFRING




THE ABSORBER.




    SULFUR 15 FORMED BY CONTACTING THE SOS-RICH SOLUTION WITH AN H2S-C02 GAS FROM THE HYDROGEN




SULFIDE GENERATING UNIT.  OFF-GAS WHICH IS MAINLY C02 WITH SMALL QUALITIES OF H23, CS2, AND COS FROM




THE REACTOR SYSTEM IS SENT TO THE BOILER FIREBOX FOR INCINERATION VIA A SURGE DRUM.  CRYSTALLINE




SULFUR IS FORMED IN THE REACTORS AND SULFUR SLURRY FLOWS TO A DIGESTER WHERE A SMALL STREAM OF




S02-RICH SOLUTION FROM THE ABSORBER IS REACTED WITH ANY DISSOLVED OR ENTRAINED H2S IN THE SLURRY




ENTERING THE DIGESTER.  FROM THE DIGESTER, T.HE SLURRY FLOWS TO THE SULFUR FLOTATION TANK.  SEPARA-




TION OF THE SULFUR FROM THE BULK OF THE SOLUTION IS ACCOMPLISHED BY FLOTATION WITH AIR.  SULFUR




FROTH, CONCENTRATED TO ABOUT 10X SOLIDS, IS SEPARATED FROM THE TOP OF THE SOLUTION AND FLOWS TO THE




SULFUR SLURRY TANK.




    REGENERATED CITRATE SOLUTION IS DRAWN FROM THE BOTTOM OF THE FLOTATION TANK AND RETURNED TO THE




ABSORBER.  SULFUR IS SEPARATED FROM THE REMAINING SOLUTION RY HEATING THE SLURRY TO ABOUT 260  F MTH




STEAM IN A SHELL-AND-TUBE EXCHANGER.  THE MOLTEN SULFUR AND THE CITRATE SOLUTION ARE SEPARATED  BY




GRAVITY IN A PRESSURIZED, STEAM-JACKETED DECANTER VESSEL.  THE MOLTEN SULFUR IS DISCHARGED




CONTINUOUSLY FROM THE BOTTOM RY INTERFACE LEVEL CONTROL AND FLOWS TO A HEATED STORAGE TANK.  THE




CITRATE SOLUTION LEAVES THE TOP OF THE DECANTER AND RETURNS TO THE FIRST REACTOR.




    SODIUM SULFATE OECAHYORATE, PRODUCED BY THE NEUTRALIZATION OF CAUSTIC WITH A SMALL AMOUNT  OF




GENERATED SULFURIC ACID, IS REMOVED FROM CITKA1E SOLUTION BY VACUUM CRYSTALLIZATION.




    GENERATION OF H2S GAS IS ACCOMPLISHED USING RECOVERED ELEMENTAL SULFUR, A GASEOUS REOUCTANT




(METHANE) AND TURBINE EXTRACTION STEAM AS CONSUMPTIVE FEED STOCKS IN A FIXED-BED CATALYTIC REACTOR.




REFER TO FIGURE 14-11 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.









                                        OPERATING HISTORY




3RD 0IIARTFR-1«)7»    ALL MAJOR EQUIPMENT HAS BEEN INSTALLED; INSTALLATION OF PIPING AND WIRING  IS  IN
                                                130

-------
                                                                               STATUS  TD  JANUARY  197<»




                                       SECTION JO (CONTINUFin




            DF.SIGN  INFORMATION FOR UNDER CONSTRUCT ION Ff-f) SYSTEMS 0*J  INDUSTRIAL  HUILEKS




ST. JOE ZINC CO.; MONACA,  PENNSYLVANIA (CONTINUF.O)






PROGRESS.








flTH OUARTFR-I97B     THE PLANT REPORTED THAT INSTALLATION OF  PIPING  AND  WIRING IS STILL  IN PROGRESS.




START-UP HAS-BEEN RESCHEDULED FOR MARCH J9T9.
                                                 151

-------
                                                                             STATUS  TO JANUARY  1979




                                      SFCTTIllM 10 (CnuTlNUED)     * 5




            OFSIGN INFORMATION FOR IINOFH CONSTKUCTinN FBI! SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION NAME




  INSTALLATION LOCATION




  SOURCE CHARACTERISTICS




  SOURCF. RATING




  NUMBER OF SFPARATE FGO UNITS




  NUMBER OF BOILERS BEING CONTROLLED




  CONTROL SYSTEM VENDOR




  CONTROL PROCESS




  NEW / RETROFIT




  START-UP DATE




  CONTROL SYSTEM STATUS




  302 REMOVAL EFFICIENCY




  MATER MAKE-UP




  SLUDGE OR BY-PRODUCT DISPOSAL









  CONTROL SYSTEM COST
                      SUN  PRODUCTION COMPANY




                      FELLOWS,  CALIFORNIA




                      OIL  (1.4X SULFUR)




                      6,000  SCFM US,000 ACFM H 570 F)




                       1




                       1




                      C-E  NATCO




                      SODIUM HYDROXIDE SCRUBBING




                      RETROFIT




                      APRIL, 1979




                      CONSTRUCTION




                      851  (000  PPM 9 INLET)




                      4 GPM




                      HOLDING POND FOR EVAPORATION




                      1 GPM  BLEEDOFF TO DISPOSAL POND




                      SEE  SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION



    SUN PRODUCTION COMPANY HAS AN ENHANCED OIL RECOVERY SITE NEAR FELLOWS, CALIFORNIA.  SEVERAL




STEAM GENERATORS ARE USED TO PRODUCE THE PROCESS STEAM REQUIRED FOR THE OPERATION.  A PART  OF  OIL,



NHICH HAS A t.4 PERCENT SULFUR, IS USED AS FUEL.



    C-E NATCO HAS BEEN AWARDED A CONTRACT TO INSTALL AN F6D SYSTEM ON ONE 25 MM BTU/HOUR  STEAM GENE-



RATOR.  NO F6D SYSTEM TREATS 12,000 ACFM FLUE GAS AT 570 F.  THE FLUE GAS IS CONTACTED WITH ONE  SET




OF SPRAYS (150 GPM) IN THE BOTTOM OF THE ABSORBER (4.5' DIAMETER X 35 FT HIGH).  PH OF 6.5  IS  MAIN-



TAINED IN THE FIRST STAGE.  THE GAS WHICH PASSES UP A TRAY WITH A CENTRAL DOWNCOMER,  IS FURTHER



CONTACTED WITH A SECOND SET OF SPRAVS (150 GPM).  A CHEVRON HIST ELIMINATOR  (INCOLOT  825) LEADS  INTO



A STUB STACK.  THE EXCESS LIQUOR FROM THE TRAY OVERFLOWS TO THt FIRST STAGE.  PH IS MAINTAINED AT



7.5 IN THF SECOND STAGE.  MAKEUP SODIUM HYDROXIDE SOLUTION (0.05 GPM) IS ADDED TO THE SECOND STAGE



BY A POSITIVE DISPLACEMENT PUMP WHILE FRESH MAKEUP WATER (4 GPM) IS ADDED TO THE FIRST STAGE.  A



BLEEDOFF (1 BPM) STREAM IS TAKEN TO WASTF DISPOSAL FROM THE FIRST STAGE RECIRCULATION LINE.




    THE ABSORBER, MIST ELIMINATOR, RECIRCUlAT ION PUMPS AND PIPING, AND THE SPRAY HEADERS  ARE 316L



SS.  THE CAUSTIC FEED PUMP AND THE PIPING AND THE INLFT DUCTWORK IS C.S.
4TH OUARTEH-1978
                     OPERATING HISTOHY




THE SYSTEM IS UNDER CONSTRUCTION.  THE STAKTIIP IS EXPECTED BY APRIL 1979.
                                                132

-------
                                                                              STATUS  TO  JANUARY  1979




                                       SFCTION 10 (CONTTMIFD)




            DFSIRN  INFIIPMATION  FOR  IINDFH  CONSTHIC T lflrt FGI>  SYSThMS  (IN  TNOHSTPML  l
  INSTALLATION NAME




  INSTALLATTON LOCATION




  SOURCE CHARACTERISTICS




  SOURCE RATING




  NUMBER OF SFPARATF FGD  UMTS




  NUMBER OF BOILERS BFIN6 CONTROLLED




  CONTROL SYSTEM VENDOR




  CONTROL PROCESS




  NEW / RETROFIT




  START-UP DATE




  CONTROL SYSTEM STATUS




  802 REMOVAL EFFICIENCY




  WATER MAKE-UP




  SLUDGE OR BY-PROOUCT DISPOSAL









  CONTROL SYSTEM COST
SUN PRODUCTION COMPANY




OILDALE, CALIFORNIA




OIL U.2X SULFUR)




6,000 SCFM (l?,non ACFM ol 570 F)









 I




C-E NATCO




SODIUM HYDROXIDE SCRUBBING




RETROFIT




APRIL. 1979




CONSTRUCTION




85% (700 PPM 3 INLET)




4 GPM




HOLDING POND FOR EVAPORATION




1 GPM BLEEDOFF TO DISPOSAL POND




SEE SECTION 11 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND  INFORMATION




    SUN PRODUCTION CO. HAS  AN  ENHANCED  OIL  RECOVERY  SITE  NEAR  OILDALE,  CALIFORNIA.   SEVERAL SMALL




GENERATORS ARE USED TO PRODUCE THF  PROCESS  STEAM REQUIRED FOR  THE  OPERATION.   A  PART  OF  THE OIL.




WHICH HAS 1.2 PERCENT SULFUR.  IS  USED AS  FUEL.




    C-E NATCO HAS BEEN AWARDED A  CONTRACT TO  INSTALL AN FGD  SYSTEM ON  ONE  25  MM  BTU/HOUR STEAM GEN-




ERATOR.  NO FGO SYSTEM TREATS  12,000 ACFM FLUE  GAS AT 570 F.   THE  FLUE  GAS IS CONTACTED  WITH ONE




SET OF SPRAYS (ISO GPM)  IN  THE BOTTOM OF  THE  ABSORBER (4.5 FT  DIAMETER  X 35 FT HIGH).  PH OF 6.5 IS




MAINTAINED IN THE FIRST  STAGE.  THE GAS.  WHICH  PASSES UP  A TRAY  WITH A  CENTRAL OOWNCOM£R. IS FURTHER




CONTACTED WITH A SECOND  SET OF SPRAYS (150  GPM).  THE GAS PASSES UP A CHEVRON MIST ELIMINATOR INTO A




STUB STACK.  THE EXCESS  LIOUOR FROM THE TRAV  OVERFLOWS TO THE  FIRST STAGE.  A PH OF 7.5  IS MAINTAIN-




ED IN THE SECOND STAGE.  MAKEUP SODIUM  HYDROXIDE SOLUTION (0.05  GPM) IS ADDED TO THE  SECOND STAGE BY




A POSITIVE DISPLACEMENT  PUMP WHILE  FRESH  MAKEUP WATER («  GPM)  IS ADDED  TO  THE FIRST STAGE.  A BLEED




OFF (1 GPM) STREAM IS TAKEN TO WASTE DISPOSAL FROM THE FIRST STAGE  RECIRCULAT10N LINE.




    THE ABSORBER, MIST ELIMINATOR,  RECIRCULATION PUMPS AND PIPING,  AND  SPRAY  HEADERS  ARE 316L S3.




THE CAUSTIC FEED PUMP AND THE  PIPING AND  THE  INLET DUCTWORK ARE  C.S.
                                                133

-------
                                                                             STATUS TO JANUARY 1979

                                      SFCTION 10 (CONTINUED)

            DESIGN INFORMATION FOR UNDER CONSTRUCTION FGD SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING



  NUMBER OF  SEPARATE F60 UNITS

  NUMBER OF  BOILERS BEING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEM  /  RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  802  REMOVAL EFFICIENCY

  SLUDGE OR  BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
TEXACO INCORPORATED

SAN ARDOr CALIFORNIA

OIL (1.7X SULFUR)

117,000 SCFM (TOTAL - 9 BOILERS)

26>000 ACFM a 600 F, FOR EACH OF 9 BOILERS.

 5

 9

58 MM (EQUIVALENT); 50 MM BTU/HR/BOILER

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 3000 SCFM = 1 EQUIVALENT MN,
THIS IS BECAUSE GAS FLON RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

DUCON COMPANY

SODIUM CARBONATE SCRUBBING

RETROFIT

MARCH, 1979

CONSTRUCTION

951 (1000 PPM 3 INLET)

SCRUBBER EFFLUENT DISPOSED OF IN WASTE WELLS

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

    TEXACO HAS CHOSEN TO PHASE OUT THE EXISTING CEILCOTE SCRUBBER SYSTEMS AT SAN ARDO OIL FIELDS DUE

TO LOU 302 REMOVAL AND HIGH MAINTAINENCE COST.   A MAJOR PROBLEM OF THE PRESENT DESIGN HAS BEEN

SCRUBBER FOULING BECAUSE OF HIGH ASH CONTENT IN THE FLUE GAS.  AS THE FIRST STEP OF THE PHASE-OUT

PROGRAM, 9 OF THE PRESENT CEILCOTE SCRUBBERS ON THE 50 MM BTU/HR STEAM GENERATORS WILL BE REPLACED

BY 3 DUCON CO. SCRUBBERS HEAOERED IN PARALLEL.  START-UP OF THE NEW EQUIPMENT IS SCHEDULED FOR MARCH

1979.  THE NEXT STEP OF THE PHASE-OUT PROGRAM IS DEPENDENT ON THE PERFORMANCE OF THE OUCON SYSTFM.

(FOR INFORMATION ON THE CEILCOTE DESIGN SEE THE TEXACO, SAN ARDO ENTRY IN SECTION 9 OF THIS REPORT).

    EACH DUCON SCRUBBING UNIT WILL CONSIST OF A VENTURI FOR PARTICULATE REMOVAL FOLLOWED BY A HORIZ-

ONTAL 3-STAGE SPRAY ABSORBER (2 IN USE, 1 STAND-BY).  IT IS HOPED THAT THE VENTURI DESIGN «ILL

ALLEVIATE THE FOULING PROBLEM.  ANOTHER DESIGN FEATURE OF THE DUCON SYSTEM IS SEPARATE RECYCLE TANKS

FOR VENTURI AND ABSORBER.  FRESH SCRUBBING LIQUOR IS INTRODUCED AT THE ABSORBER, ENTERS THE ABSORBER

RECYCLE TANK AND PARTIALLY OVERFLOWS TO THE VENTURI WHERE IT IS RECYCLED AND FINALLY DISPOSED OF IN

ON-SITE WASTE WELLS.  IN A COMPLETE CYCLE, THE SCRUBBER LIQUOR IS RECYCLED 1 TIMES BEFORE DISPOSAL.

    A VOLUME OF 78,000 ACFM a 600 F WILL BE HANDLED BY EACH SCRUBBER.  FURTHERMORE, EACH TRAIN CAN

TREAT 501 OF THE LOAD AND CAN »E ISOLATED FROM THF FLUE GAS FLOW.  IT IS HOPED THAT THIS SYS1FM DF-

SIGN WILL YIELD SIGNIFICANTLY HIGHER AVAILABILITIES THAN THE DESIGN CURRENTLY IN USE.

     THE DUCON ABSORBFR MODULE IS CONSTRUCTED OF FIBERGLASS.  THE VENTURI IS MADE OF 316L SS.  THE

OVERALL DIMENSIONS OF THF SYSTEM ARE 12 FFE1 X 23 FFFT * 25 FEtT.  THF. SrrfAY MIZZLES WILL BE NYLON

-------
                                                                              STATUS TO JANUARY 1179




                                       SFCTTON 10 (CONTTWUFin




             OFSIKN INFORMATION FOR HM)fR CONSTHIICTTrtN FRI) SYSTEMS ON TunilST P T. AL HOfLFKS




TEXACO  INCORPORATED;  SAN AROO. CALIFORNIA (CONTINUED)






OR  STAINLFSS STEEL.  ROTH THE ABSORBER AND VF.NTIIRI RECYCLF PUMPS ARF "AMiFar fURFO BY GAl.LTRFH.  THEY




•ARE RUBBER-LINED AND  SIZED BOO AND 1200 6PM RESPECTIVELY AT aO HP.  THERE ARE i GARDEN CITY FANS PER




UNIT  RATED AT 100 HP  EACH.  OUCON HAS GUARANTEED i S02 REMOVAL EFFICIENCY.




    REFER  TO FIGURE I«-«3 IN SECTION Jfl FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.









                                         OPERATING HISTORY




3RD OUARTER-1978    TEXACO HAS TAKEN DELIVERY ON ONF DUCON  SYSTEM.  DELIVERY ON THE OTHER UMTS IS




EXPECTED SOON.  THE UNITS ARE SCHEDULED TO START-UP WITH A  NAOH  SYSTEM.   CONSIDERATION  IS t»EING




6IVEN TO FUTURE CONVERSION TO NA2C03.









4TN OUARTER-1978    CONSTRUCTION  IS PROGRESSING AS SCHEDULED  AND THE SYSTEMS WILL BE SODIUM




CARBONATE SCRUBBING.  THE THREE FGO SYSTEMS ARE ON THE PLANT  SITE.  THE  SYSTEMS ARE SCHEDULED  TO 8E




ONSTREAM IN MARCH  1974.

-------
                                                                             STATUS  TO JANUARY  197"?
                                            SECTION II
                  OEST6N IfcFflRMAT HIM FOR PLANNtl) FCtl SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBER OF SEPARATE FRO UNITS
  NUMBER OF BOILERS BEING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP OATE
  CONTROL SYSTEM STATUS
  802 REMOVAL EFFICIENCY
  SLU06E OR BY-PRODUCT DISPOSAL
C.A.r.(CAHBtOF-AMOCO-MONSANTO)
HOUSTON, TEXAS
FUtL NOT YF.T SELECTED
1,200,000 SCFM (1 BOILER)
 1
 I
600 I'M (EQUIVALENT); 1 BOILER
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EQUIVALENT HI
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
VENDOR NOT YET SELECTED
PROCESS NOT YET SELECTED
NEW
1964
PLANNED-CONSIDERING S02 CONTROL
NOT DETERMINED
DISPOSAL TECHNIQUE NOT KNOWN
                                       BACKGROUND INFORMATION
    UNION CARBinE. AMOCO AND MONSANTO HAVE ENTERED TN A JOINT VENTURE (C.A.H.) TO ERECT A C06ENERA-
TION FACILITY NEAR HOUSTON, TEXAS.  THE CAM PLANT WILL RE DESIGNED TO PROVIDE 3 MILLION LBS/HOUR
STEAM FOR PROCESS USF BY THE TEXAS CITY PLANTS OF THE THREE COMPANIES.  AS A COGENERATION PLANT, CAM
MILL ALSO PROVIDE STEAM FOR COMMUNITY PUBLIC SERVICE COMPANY TU GENERATE ABOUT 100-MH OF ELECTRICITY
FOR THE AREA.  CAM WILL ALSO SAVE ENERGY BY OPERATING AT A 75* FUEL EFFICIENCY COMPARED TO THE  35*
FOR THE CONVENTIONAL ELECTRIC UTILITY PLANTS.
    THE TYPF OF COAL OR LIGNITE TO 8E USED IS NOT FINALIZED.  HOWEVER. IT IS CERTAIN THAT AN FGO
SYSTEM WILL BE REQUIRED.  STARTUP FOR THE FACILITY IS SCHEDULED FOR 1984.


                                        OPERATING HISTORY
3RD OUARTER-1978    THE SYSTEM IS STILL IN THE VERY EARLY STAGES OF DEVELOPMENT.  STEARNS-ROGERS
HAS BEEN CONTRACTED TO 00 PRIMARY ENGINEERING AND AID IN THE CHOICE OF AN FGD SYSTEM AND VENDOR.
AS OF THIS REPORT PFRIOD, COAL TYPE HAS NOT BEEN CHOSEN AND A CONTROL SYSTEM OR- SYSTEM VENDOR HAS
NOT BEEN SELECTED.


4TH OUARTER-I970    THE SYSTEM IS NOW UNDERGOING DETAILED DESIGN ENGINEERING AND PLANNING AND IS
SCHEDULED FOR FINAL REVIEW BY THE THREE COMPANIES.  IF APPROVED BY ALL THREE PARTNER COMPANIES,
CONSTRUCTION WILL START IN EARLY  I960 WITH COMPLETION OF THE PROJECT SCHEDULED FOR  1984.  THE
SELECTION OF CONTROL SYSTEM  IS EXPECTED BY THE END OF THE NFXT QUARTER.
                                                136

-------
                                                                              STATUS TO JANUARY 1979

                                       SECTION II (CONTINUED)

                   I1FSTGM INFORMATION FOR Pl.ANNK) Fr,n SYSTFMS fir, (MnilSIKIAl  niilLFHS
   INSTALLATION NAME

   INSTALLATION LOCATION

   SOURCE  CHARACTERISTICS

   SOURCE  RATING



   NUMBER  OF  SEPARATE FGO UNITS

   NUMBER  OF  BOILERS  BFING CONTROLLED

   SOURCE  CAPACITY




   CONTROL SYSTEM VENDOR

   CONTROL PROCESS

   NEW / RETROFIT

   START-UP OATE

   CONTROL SYSTEM STATUS

   803 REMOVAL  EFFICIENCY

   SLUDGE  OR  BY-PRODUCT  DISPOSAL
CARBORUNDUM ABRASIVES

BIIFFALII, Nfift YORK

COAL C2.2X SULFUR)

30,000 SCFM (TOTAL - 2 BOILERS)

160,000 LBS/HR STFAM (TOTAL - 2 BOILERS)

 1

 2

15 MK (EQUIVALENT)

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EQUIVALENT
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING

CARBORUNDUM ENVIR. SYS. LTD.

LIME SCRUBBING

RETROFIT

1980

PLANNED-CONTRACT AWARDED

95X

WASTEWATER TREATMENT
                                        BACKGROUND INFORMATION

    AT THE CARBORUNDUM ABRASIVES PLANT IN BUFFALO, NEW YORK THERE ARE 4 COAL-FIRED BOILERS BURNING

2.2X SULFUR COAL  WITH  AN AVERAGE HEAT VALUE OF 13,000 8TIJ/L8.  TWO OF THESE BOILERS ARE IDENTICAL

AND HAVE  A TOTAL  STF.AM GENERATING CAPACITY OF 160,000 LB/HR.

    THE FLUF. GASES  FROM THF. TWO BOILERS MLL BE CONTROLLED BY A VENTURI SCRUBBER (a FT INLET,  13 IN

THROAT, 13 FT HIGH)  FOLLOWED BY A b-STAGE SPRAY TOWER (8.5 FT DIA X 38 FT HIGH).  THE FGD SYSTEM WAS

DESIGNED  BY CARBORUNDUM ENVIRONMENTAL SYSTEMS LTD.,  AND WILL HANDLE 90,000 ACFM,' OR 1001 OF THE FLUE

GAS FROM  BOTH BOILERS.   LTMF WILL BE USED AS THE SCRUBBING MEDIUM AND THE DESIGN S02 REMOVAL

EFFICIENCY IS 95X.   THE SPRAY TOWER  IS DESIGNED TO OPERATE AT 125 F WITH AN L/G RATIO OF

80 GAL/1000 ACF.  THE  MAXIMUM LIQUID FLOW RATE IS 3000 GPM.  MAKE-UP WATER WILL PF  FED TO THE  TOP

OF THE ABSORBER AT  A RATE  OF « GPM, WHILE A 30 GPM  BLEED STREAM WILL FLOW FROM THE HECIRCULATION

TANK DIRECTLY TO  AN EXISTING TERTIARY WASTE TREATMENT FACILITY.

     REFER TO FIGURE 11-6  IN SECTION 1« FOR A DETAILED PROCESS FLOW DIAGRAM OF  THIS SYSTEM.



PARTICULATE REMOVAL OPERATING HISTORY

    THE VENTURI AND ABSORBER MODULE  WERE  INSTALLED IN 1<»75.  THE VENTURI WAS PUT  INTO SERVICE  FOR

PARTICULATE REMOVAL AT  THAT  TIME  USING WATER AS THE  SCRUBBING MEDIUM.   THE  HIGH CHLORIDE  CONTENT  OF

THE FLUE GAS HAS  CAUSED  SERIOUS CORROSION PROBLEMS.   EFFLUENT FROM  THE  VENTURI  HAS  A  PH  OF 2.8.

THE 316L SS VFNTURI WILL BF  REPLACED WITH A HASTELLOY-C  UNJT  BEFORE  START-UP FOR  S02  REMOVAL.   THE

ABSORBER,  ALSO OF 316L  SS  IS BEING USED AS A SEPARATOR AND  IS ALSO  BADLY CORRODED.   AN FRP UNIT WILL
                                                137

-------
                                                                              STATUS TO JANUARY 1979




                                      SECTION  11  (CONTINUED)




                  DESIGN  INFORMATION FOR  PLANNED  FED  SYSTEMS  (IN INDUSTRIAL BOILERS




CARBORUNDUM ABRASIVES: BUFFALO, NEW YORK  (CONTINUED)






BE INSTALLED TO REPLACE IT AND WILL INCLUDE  A  3-PASS  CHEVRON  MIST  ELIMINATOR, ALSO MADE OF FHP. AN




ACID-RESISTANT COATING WAS RECENTLY APPLIED  TO THE  STACK  LINER. COMPLETION OF THESE MODIFICATTONSi




AND START-UP FOR SOa REMOVAL ARE SCHEDULED FOR !980.
                                                138

-------
                                                                             STATUS TO JANUARY  t<»79
                                      SECTION II (CONT1MIEI))
                  DESIGN INFORMATION FO" PLANNFD Fr;n SYSTFl-'S C1N INDUSTRIAL RuTLF.MS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBER OF SEPARATE  FGO UNITS
  NUMBER OF BOILERS BEING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEK / RETROFIT
  START-UP DATE


  CONTROL SYSTEM STATUS
  302 REMOVAL EFFICIENCY
  SLUDGE OR BY-PRODUCT DISPOSAL
CATERPILLAR TRACTOR CO.
MAPLFTON, ILLINOIS
COAL (3.2* SULFUR)
105.000 SCFM (TOTAL - 2 BOILERS)
80,000 ACFh a 3SO f, FOR E4CH OF 2 FGO SYSTEMS,
500,000 L8/HR STEAM (TOTAL - 2 BOILERS)
 2
 2
52 M* (EQUIVALENT)J TOTAL - 2 BOILERS.
(FOR THIS REPORT, UNLESS STATF.O OTHERWISE, 2000 SCFM a  1 EQUIVALENT
THIS IS BECAUSE GAS FLOW RATE IS THF PRIMARY FACTOR IN  MOOULE
FMC ENVIRONMENTAL EOUtPMENT
DOUBLE ALKALI (CONCENTRATED)
NEW
JANUARY, 1
-------
                                                                             STATUS  TO JANUARY  1979
                                      SFCTION n (cnNTiwuF.D)
                  DFSIGW INFORMATION FUK PLANNER FGD SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION NAMF
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING

  NUMBER OF SEPARATE FGO UNITS
  NUMBER OF BOILERS BFING CONTROLLED
  SOURCE CAPACITY
  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  803 REMOVAL EFFICIENCY
  MATER MAKE-UP
  SLU06E OR BY-PRODUCT DISPOSAL
CHEVWON U.S.A. INC.
BAKEHSFIELO, CALIFORNIA
OIL (1.1* SULFUR)
136.000 SCFM fTOTAL - 12 BOILERS)
150,000 ACFM 3 500 F, FOR EACH OF 2 FGO SYSTEMS
 2
IS
73 Mw (EQUIVALENT)? TOTAL - 12 BOILERS
600 MM BTU/HR (TOTAL - 12 BOILERS; 6 BOILERS/FGD SYSTEM)
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM =  1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  MODULE  SIZING.)
KOCH ENGINEERING
SODIUM CARBONATE SCRUBBING
RETROFIT
APRIL. 1979
PLANNED-REQUEST ING/EVALUATING BIOS
90X (680 PPM 3 INLET)
12-13 GPM
MASTENATER TREATMENT
                                       BACKGROUND INFORMATION
    CHEVRON U.S.A. HAS AN OIL SITE AT BAKF.RSF tELO, CALIFORNIA. THERE ARE ABOUT SO STEAM GENERATORS
KHICH BURN 1.11 CRUDE OIL.  EACH GENERATOR IS RATED AT 50 MM BTU/HR.  THE STEAM IS USED FOR ENHANCED
OIL RECOVERY FROM THE OIL WELLS.
    A CONTRACT MAS AWARDED TO KOCH ENGINEERING TO CONSTUCT THO MORE FGD SYSTEMS.  THE DESIGN HILL BE
SIMILAR TO EXISTING NA2C03 SCRUBBING UNITS.  REFER TO SECTION 9 OF THIS REPORT FOR DETAILS ON THESE
FED SYSTEMS.
                                        OPERATING HISTORY
    «TH ouARTER-me.  THE FGD SYSTEMS ARE UNDER DESIGN.  THE CONSTRUCTION MILL START IN JANUARY
1979.  THE START-UP IS STILL EXPECTED TO BE APRIL, 1979.
                                                140

-------
                                                                            STATUS TO JANUAHY 1179
                                     SECTION 11  (CONTINUED!

                OFSTGI  INFORMATION FIIH P14NNE"  FRO SYSTF.MS  01. IMnilSTtf tAl
INSTALLATION NAME

INSTALLATION LOCATION

SOURCE CHARACTERISTICS

SOURCE RATING



NUMBER OF SEPARATE FGO  UNITS

NUMBER OF BOILERS REINS CONTROLLED

SOURCE CAPACITY




CONTROL SYSTEM VENDOR

CONTROL PROCESS

NEW / RETROFIT

STAHT-U" DATE

CONTROL SYSTEM STATUS

302 REMOVAL EFFICIENCY

SLUDGE OR BY-PRODUCT DISPOSAL
OIIPOHiT, INC.

RFORGtA

COAL (1.5% SULFUR)

280,000 SCFM (TOTAL - 3 BOILERS)

1,?00,000 L«/HR STEAM (TOTAL - 3 HOILFRS)

 1

 ^

110 MM (EQUIVALENT)

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EQUIVALENT MW.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

VENDOR NOT YET SELECTED

DOUBLE ALKALI

NEW

1<>BT

PLANNED-CONSIDERING S02 CONTROL

90X

DEWATERED SLURRY TO LANDFILL
                                              111

-------
                                                                            STATUS  TO JANUARY  1979

                                    SFCTION  11  (CONTINUED)

                DESIGN INFORMATION FOB PLANNED  FGD SYSTEMS ON  INDUSTRIAL  BOILERS
INSTALLATION NAME

INSTALLATION LOCATION

SOURCE CHARACTERISTICS

SOURCE RATING



NUMBER OF SEPARATE FED UNITS

NUMBER OF BOILERS BEING CONTROLLED

SOURCE CAPACITY




CONTROL SYSTEM VENDOR

CONTROL PROCESS

NEW / RETROFIT

START-UP DATE

CONTROL SYSTEM STATUS

802 REMOVAL EFFICIENCY

SLUDGE OR BY-PRODUCT DISPOSAL
OIIPONT, INC.

TEXAS

COAL C0.5X SULFUR)

330,000 SCFM (TOTAL - i BOILERS)

1,600,000 L«/HR STEAM (TOTAL - 3 BOILERS)

 1

 Z

160 MW (EQUIVALENT); TOTAL - Z BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM =  1 EQUIVALENT  Mh.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  MODULE  SIZING.)

VENDOR NOT VET SELECTED

LIMESTONE SCRUBBING

NEW

1988

PLANNED-CONSIDERING SOZ CONTROL

SOX

DEKATEREO SLURRY TO LANDFILL
                                              IDS

-------
                                                                              STATUS  TO  JANUARY  1979
                                      SECTION  H  (CONTINUED)
                  DESIGN INFORMATION FOR PUNNED  FRO  SYSTFMS  ON  INOUSTHUL  BOILERS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBER OF SEPARATE FGO UNITS
  NUMBER OF BOILERS BEING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  802 REMOVAL EFFICIENCY
  SLUD6E OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
GRISSOM AIR FORCE BASE
BUNKER HILL, INDIANA
COAL (0.9X - 4.6X SULFUR)
33,000 SCFM (TOTAL - 3 BOILERS)
 I
 S
16 M* (EQUIVALENT); TOTAL - 3 BOILERS
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 3000 SCFM s t EHUIVALF^T Ha.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
AIRPOL INDUSTRIES
DOUBLE ALKALI (CONCENTRATED)
I NEW Z RETRO
SEPTEMBER, 1979
PLANNED-CONTRACT AWARDED

DEWATERED SLURRY TO LANDFILL
CAPITAL! SI,600,000 - S3,000.000 (1978).  THIS IS THF
PROJECTED TOTAL INSTALLED COST.
                                       BACKGROUND  INFORMATION
    AT  6RISSOM AIR FORCE BASE NEAR BUNKER HILL,  INDIANA, THE AIR FORCE  HAS  INITIATED  A PROJECT ftMlCH
INCLUDES  THE ERECTION OF A NEH 65,000 LB/HR COAL-FIRED BOILER AND  AN FGD  SYSTEM FOR THE NEn UNIT  AND
T»0  EXISTING 40,000 LB/HR COAL-FIRED UNITS.  THE NAVY IS THE MILITARY CONSTRUCTION AGENT FOR THE
PROJECT AND ARNOLD M. DIAMOND HAS THE OVERALL CONSTRUCTION CONTRACT.  COAL  FOR THE BOILERS MAY
RANGE FROM  0.« - 4.6X SULFUR AND WILL HAVE AN AVERAGE HEATING VALUE OF 11,500 BTU/LB.  THE BOILERS
FIRE APPROXIMATELY WITH 40X EXCESS AIR.
    AIR POLLUTION INDUSTRIES, INC. (AIRPOL) HAS BEEN AWARDED A CONTRACT TO  SUPPLY A CONCENTRATED
DOUBLE  ALKALI FGD SYSTEM.  THE SYSTEM WILL HAVE A GUARANTEED MAXIMUM SOS  DUTLET CONCENTRATION OF
I.Z  LB/MILLION BTU AND A MAXIMUM PARTICIPATE CONCENTRATION OF 0.171 LB/MILLION flTU.  FLUE GAS FMOM
EACH BOILER WILL PASS THROUGH A MECHANICAL COLLECTOR.  THE GAS FROM ALL THRFE BOILERS ftILL THEN BE
MANIFOLDED  TOGETHER AND PASS THROUGH TWO PARALLEL ABSORBER TRAINS, EACH CAPABLE OF HANDLING 5UX
OF THE  FLUE GAS.  THE MAXIMUM FLOW RATE IS B0,«73 APFM a «63 F.
    THE AIRPOL SYSTEM CONSISTS OF Z PARALLEL 316 S3 VENTURI SCRUBBERS,  EACH FOLLOWED BY A
 CYCLONIC SEPARATOR AND STUB STACK.  THFRF IS A COMMON RECIRCULATTON TANK MADF OF 316 STAINLESS
 STEEL  AND  TWO 600 GPM RUBBER-LINED RFCIHCULATION PUMPS.  THf L/G RATIO IS  IS GALl ONS/1OOO ACF,
 "1TM A SLURRY INLET TEMPERATURE OF 155 F AND A PH OF BETWEEN 5 AND 7.   RFCtRCULATION PIPES WTLL
 *E  MADE OF FRP.
    A  100-200 GPM BLEED STREAM FROM THE RECIRCIIl ATTCIN TANK GOES TO A  316 SS LIMf  REAC1ICIK
                                               143

-------
                                                                               STATUS  TO  JANUARY  1979




                                       SFCTION 11 tCONTIK'UFII)




                   DFSTBM  INFORMATION FOR PLAMJi-D FGfl SYS1FHS Oh INDUSTRIAL BOILERS




6RIS80M ATM FORCE  BASF; BUNKER  HILL, INDIANA (CONTINUED)






WHERE THE SnnillM SULFIIE/SUIFATF  IS HF.AC1ED nITH SLAKFO LIME PRODUCING CALCIUM SULFATE  AND




RF6FNFRATTNG THF. SODIUM HYDROXIDE.   FROM THE REACTION TANK THE MIXED SLURRY FLOWS TO  A  THICKENER/




CLARIFIES, WHERE INSOLUBLE  CALCIUM  COMPOUNDS ARE SEPARATED FROM THE CLEAR OVERFLOW CONTAINING THE




REGENERATED NAOH.  THE CL*HIFIF.R  OVERFLOW IS RETURNED TO THE ABSORBER* hHlLF.  THE UNDERFLOW  IS




REACTED ONCE AGAIN WITH LIHF  IN A PIPELINE MIXER TO PRECIPITATE ANY RESIDUAL  SULFITE  AS SULFATE.




THE SLURRY IS THEN FILTERED  IN  A  ROTARY  FILTER*  AND THE FILTRATE IS RETURNED  TO THE REACTION TANK.




THE FILTER CAKE WILL BE LANOFILLfcD.   THE TANKS WILL BE MADE OF 316 SS AND THE PIPING  OF FHP.  THE




LIME STORAGE TANK  AND SLAKER  WILL BE CARBON STFEL.
                                                100

-------
                                                                             STATUS TO JANUARY 1979
                                      SECTION II  (CONTINUED)
                  OFSTRN INFORMATION FOR PLANNFO  FKH SYSTEMS ON INOIISTIHAI
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING



  NUMBER OF SEPARATE FGD UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW / RETROFIT

  START-UP DATF

  CONTROL SYSTEM STATUS

  SOB REMOVAL EFFICIENCY

  SLUD6E OR BY-PRODUCT DISPOSAL
SHELL OIL COMPANY

BAKERSFItLO, CALIFORNIA

OIL tl.lZ SULFUR)

99,000 SCFM (TOTAL - » BOILERS)

400 MM BTII/HR, (50 MM 8TII PER BOILER)

 1

 A

SO MN (EQUIVALENT)

(FOR THIS REPORT, UNLESS STATED OTHERWISE,  2000 SCFM = |  EQUIVALENT MM.
THIS IS BECAUSE GAS FLON RATE IS THE PRIMARY FACTOR IN MODULE  SIZING.)

VENDOR NOT YET SELECTED

PROCESS NOT YET SELECTED

NEW



PLANNED-CONSIDERING 803 CONTROL

9«X (575 PPM 303 3 INLET)

DISPOSAL TECHNIQUE NOT KNOWN
                                        BACKGROUND INFORMATION

    SHELL OIL IS CONSIDERING IMPLEMENTING FGO TECHNOLOGY TO CONTROL EMISSIONS FROM 8 SMALL OIL-

FIRED (1.IX SULFUR) STEAM GENERATORS.  NO PROCESS OR START-UP OATF. HAVE AS YET BEEN SPECIFIED.  AN

SOS REMOVAL EFFICIENCY OF 9«X MILL BE KF.OUIRED.
                                               145

-------
                                                                             STATUS  TO  JANUARY  1979

                                      SECTION 11  (CONTINUED)

                  DESIGN INFORMATION FOR PLANNFD FGD SYSTFMS ON INDUSTRIAL BOILFHS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING

  NUMBER OF SEPARATE FGD UNTTS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEM / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  802 REMOVAL EFFICIENCY

  3LUD6E OR BY-PRODUCT DISPOSAL
SHELL OIL COMPANY

TAFT, CALIFORNIA

OIL (t.lZ SULFUR)

a5,000 SCFM (TOTAL - 2 BOILERS)

 0

 a

12 M* (EUUIVALENT); 100 MM BTU/HHf TOTAL - 2 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM =  1 EQUIVALENT  MW.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  MODULE  SIZING.)

VENDOR NOT YET SELECTED

PROCESS NOT YET SELECTED

NEM



PLANNED-CONSIDERING S02 CONTROL

9« (575 PPM 802 3 INLET)

DISPOSAL TECHNIQUE NOT KNOWN
                                        BACKGROUND INFORMATION

    SHELL OIL IS CONSIDERING IMPLEMENTING FGO TECHNOLOGY TO CONTROL EMISSIONS FROM 2 SMALL OIL-

FIRED (1.11 SULFUR) STEAM GENERATORS.  NO PROCESS OR START-UP DATE HAVE AS YET BEEN SPECIFIED.   AN

S02 REMOVAL EFFICIENCY OF 9
-------
                                                                             STATUS 10 JAMIAWY 1
-------
                                                                              STATUS TO JAMJAtfY 1979

                                      IifCTION 11  (COMIMIFIO

                  DFSH-N INFORfHTTON FOP PLANNED  FGO SYSTFMS ON  INOUSTR1AI  BOILERS
  INSTALLATION NA*F

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATINfi



  NUMBER OF SEPARATE F6H UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOURCE CAPACITY
  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  S02 REMOVAL EFFICIENCY
        CORRECTIONAL INST.

KITTSBURG, PENNSYLVANIA

COAL (5.51 SIILFIIK)

10,000 SCFM (TOTAL - 1 BOILER)

20, Con ACFM o> bOOF
30,000 LB/HR STEAM

5 MW (EQUIVALENT), 38 MM BTU/HR

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM  =  I  EQUIVALENT  HH.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN  MODULE  SIZING.)

PITTS8URG ENV. * ENGY. SYSTEMS

SULF-X SCORE

RETROFIT

NOVEMBER, 1979

PLANNED-CONTRACT AWARDED

90X (3000 PPM 3 INLET)

60X NOX REMOVAL (200 PPM a INLET)
                                       BACKGROUND INFORMATION

     THE WESTERN CORRECTIONAL INSTITUTION IN PITTSBURGH, PA. HAS TWO  IDENTICAL  COAL-FIRED  BOILERS,

EACH RATED AT 30,000 LB/HR STEAM.  ONE BOILER IS ALWAYS ON STAND-BY AND  THE  OPERATING  BOILER BURNS

HIGH SULFUR C3.5X S) PENNSYLVANIA BITUMINOUS CflAL.

     THE FGO SYSTEM, SULF-X SCORE PROCESS, WILL BE RETROFITTED BY  PITTSBURGH ENVIRONMENTAL AND

ENERGY SYSTEMS, INC.  THE PROCESS HAS DEMONSTRATED 802 AND NOX REMOVAL CAPABILITIES  ON A  i-MH BOILER

AT THE U.S. ARMY POWER PLANT AT FORT BENJAMIN, HARRISON, PA.  IRON SULFIDE  (FES)  SLURRY IS USED AS

THE ABSORBENT WHICH RFAC1S WITH S02 AND NO TO FORM IRON OXIDE (FED),  IRON BISULFIDE  (FES?) AND

NITROGEN.  THE BLEfD-OFP STREAM IS SENT THROUGH A THICKENER, VACUUM FILTER  AND  A  CALCINER  WHERE THE

IRON COMPOUNDS ARE REDUCED BY COAL TO FES AND S.  FES  IS RECYCLED  WHILE  S IS RECOVERED *S  A BY-

PRODUCT.  THE ABSORBER (5 FT, DIA. X 30 FT. HIGH) HILL HAVE a KOCH ENGINEERING  FLEXITRAYS  AND A

FLEXIMESH DEMISTER.  THE FLUE GAS (20,000 ACFM S 600 F) WILL CONTAIN  2000 PPM S02-AND  200  PPM NO

WHICH WILL BE REDUCED TO 200 PPM AND «0 PPM RESPECTIVELY.  THE ABSORBER  WILL BE MADE OF 316L SS,

BUT THE REGENERATION SECTION WILL BE PRIMARILY OF CARBON STEEL.


                                         OPERATING HISTMKY

4TH OUARTER-197B     THE SYSTEM IS IN THE OFSIGN PHASE.  THE AHSOR8ER SECTION ONLY OF  THE  FGD SYSTEM

WILL BE STARTF.D UP  IN MAY 1979 AND TESTED FOR A SHORT  DURATION.  THE  REGENERATION LOOP WILL BE

COMPLETED BY LATE FALL OF 1979.
                                                I UK

-------
                                                                             STATUS  TO JANUARY


                                             SFCTION  J?


                     INSCRIPTION OF  INnilSTPtAl BnTLFk FPD SYSTEMS NOT OPF.RAT1NC,
  INSTALLATION NAME


  INSTALLATION LOCATION


  SOURCE CHARACTERISTICS


  SnURCF RATING





  NUMBER OF SEPARATE FGO UNITS


  NUMBER OF BOILERS BEING CONTROLLED


  SOURCE CAPACITY
  CONTROL SYSTEM VENDOR


  CONTROL PROCESS


  NEW / RETROFIT


  START-UP DATE


  CONTROL SYSTEM STATUS


  SOS REMOVAL EFFICIENCY


  SLUDGE OR BY-PRODUCT DISPOSAL


  CONTROL SYSTEM COST
BIlNGf, INC.


CAIRO. ILLINOIS


COAL ill SULFUK)


IflfOCO SCFH (TOTAL - Z BOILERS)


81,000 ACFM ,1 520 F


 1


 ?.


2? Mw (EOUIVALENT); TOTAL - i BOILERS


1«0,000 LQS/HR STEAM (TOTAL)


(FOR THIS REPORT, UNLESS STATED OTHFRKISE, ?OOU SCFM = 1 FOIIIVALENT MW.

THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)


DRAVO CORP./NAT'L LIME ASS'N


LIME SCRUBBING


RETROFIT


SEPTEMBER, 1977


INDEFINITELY SHUT DOWN


9« (3700 PPM INLET)


OENATERED SLURRY TO LANDFILL


SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION



    BUNSE PURCHASED THIS LIME SCRUBBING  SYSTEM  FOR  TESTING  PURPOSES.   THE LF*IS SCRUBBER, HHICH IS
                                             *

* HORIZONTAL ROTARY VESSEL WITH  INTERNAL CHAINS, PERFORMED  VERY  WELL  DURING  THE TEST  (9« PERCENT 803



REMOVAL).  PRESENTLY, BUNSE 19 USING LOW SULFUR COAL  (0.9 PERCENT)  AND HAS NO  PLANS- TO RESTART



F6D OPERATIONS.
                                                149

-------
                                                                            STATUS TO JANUARY 1<»7
-------
                                                                             STATUS TO JANUARY 1979

                                      SFCTION 12 (CONTINUED)

                     DESCRIPTION OF INDUSTRIAL BUILFR FGU SYSTh«S NOT OPEHATINR
  INSTALLATION NAME

  INSTALLATION LOCATION

 40URCE  CHARACTERISTICS

  SOURCE  RATING

  NUMBER  OF  SEPARATE FGD UNITS

  NUMBER  OF  BOILERS BEING CONTROLLED

  SOURCE  CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW  / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  302  REMOVAL EFFICIENCY

  ^ARTICULATE REMOVAL EFFICIENCY

  SLUDGE  OR  BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
HARRIS MINING -en.

SPRUCE PINE, NORTH CAROLINA

COAL (O.SZ SULFUR)

0,000 SCFM (TOTAL - 2 BOILERS)

 2

 2

2 MW (EQUIVALENT); TOTAL - 2 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1  EQUIVALENT MH.
THIS is BECAUSE GAS FLOW RATF. rs THF PRIMARY FACTOR IN MODULE SIZING.)

H.W. SLY MANUFACTURING CO.

WATER SCRUBBING (NA.NH3 OPTN.)

RETROFIT

1973

INDEFINITELY SHUT OOhN



96X

DISPOSAL TECHNIQUE NOT KNOWN

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

    THE  F6D  SYSTEM AT THE HARRIS MINING COMPANY LOCATED AT SPRUCE PINE, NOKTH CAROLINA REMOVES FlY-

*SH  AND  SULFUR DIOXIDE FROM THE FLUE GAS OF A COAL FIRED BOILER.  THE SCRUBBER IS A *.W. SLY

IHPINGENT  TYPE SCRUBBER CONSTRUCTED OF 30« STAINLESS STEEL.  THE BOILER IS BATED 1.9 MM

(EQUIVALENT  200 BOILER HORSEPOWER).  COAL COMPOSITION IS TYPICALLY 0.8X SULFUR AND 5X ASH.  PRIMARY

INTEREST IN  FLUE 6AS SCRUBBING IS IN FLYASH REMOVAL AND NO TESTS FOR SULFUR DIOXIDE REMOVAL EFFI-

CIENCY HAVE  BEEN MADE.



                                         OPERATING HISTORY

2ND  QUARTER-1977    NO OPERATIONAL PROBLEMS HAVE BEEN HEPOKTtD.


>ST  OUARTER-1978    THIS PLANT HAS BEEN MOVED TO THE INACTIVE SYSTEMS FILF UNTIL SUCH TIME AS ACTUAL

F6D  OPERATIONS BEGIN.  THE SCRUBBER IS EQUIPPFD WITH ALKALI ADDITION CAPABILITY, BUT WITH

*HE  LOW  SULFUR COAL CURRENTLY BEING FIHFP, NO ALKALI ADDITION UR PH CONTROL IS OCCURRING.


2ND  BUARTER-1978    PLANT REPORTED NO CHANGE.

J"D  QHARTER-197H    PLANT REPORTED NO CHANGE.
                                               151

-------
                                                                              STATUS TO JANUARY !<>79

                                      SFCTJflN  \?  (CflwTINUFn)

                             TON nF  INDIISTKtAL BOILFR  FGO  SYSTEMS  NOT  OPERATING
  INSTALLATION

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING



  NUMBER OF SEPARATE FGO UNITS

  NUMBER OF BOILERS HFING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEK / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  S02 REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  SLUDGE OR BY-PRODUCT DISPOSAL



  CONTROL SYSTEM COST
NDRTHFAN OHIO SUGAR COMPANY

FIWHAY, OHIO

COAL (1.2X SULFUR, AVERAGE)

h5,230 SCFM  (TOTAL - 2 80TLERS)

100,000 LKS/HR STEAM (TOTAL - 2 BOILERS)

 2

 2

33 MW (EQUIVALENT), TOTAL - 2 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE,  2000  SCFM = 1  EQUIVALENT Hi
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY  FACTOR  IN MODULE SIZING,;

GREAT MFSTERN SUGAR

SODIUM CARBONATE SCRUBBING

RETROFIT

OCTOBER, 197«

TERMINATED

76Z (600 PPM a INLET)

901

MASTEWATER TREATMENT AND DISCHARGE TO CITY  SEMER

BLEED-OFF STREAM TO HOLDING TANK

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

    THE NORTHERN OHIO SUGAR COMPANY HAS TERMINATED ALL SUGAR PRODUCTION OPERATIONS  AT  FINDLAY  OHIO.

THE PLANT IS NOW OPEN ONLY AS A SHIPPING AND RECEIVING STATION.  THE SCRUBBER OPERATED DURING  THE

1975, 1976, AND 1977 SUGAR PRODUCTION SEASONS BEFORE THE SHUTDOWN OCCURRED.
                                                152

-------
                                                                              STATUS  TO  JANUARY  1979
                                       SECTION 12 (CONTINUED!
                      DESCRIPTION OF INDUSTRIAL ROUFk FRD SYSTms  NOT  OPERATING
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE BATING
  NUMBER OF SEPARATE FGD  UNITS
  NUMBER OF BOILERS 8EIM6 CONTROLLED
  SOURCF. CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  802 REMOVAL EFFICIENCY
  PARTICULATE REMOVAL EFFICIENCY
  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
SMELLER GLOBE CORP.
NORFOLK, VIRGINIA
COAL (« l.OZ SULFUH)

8,000 SCFM (TOTAL - 1 BOILER)
 1

 1

9 MW (EQUIVALENT); TOTAL - I  BOILER

(FOR THIS REPORT, UNLESS STATED OTHERWISE,  2000 SCFM = l  EQUIVALENT MW.
THIS IS BECAUSE GAS FLOW RATE IS THF PRIMARY FACTOR IN MODULE SIZING.)
n.h. SLY MANUFACTURING CO.
SODIUM HYDROXIDE SCRUBBING
RETROFIT

1975
INDEFINITELY SHUT DOWN

NOT DETERMINED
NOT DETERMINED

OVERFLOW TO SEWER/SLUDGE TO LANDFILL
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND  INFORMATION
     IN NORFOLK, VIRGINIA, SHELLER  GLOBE  CORPORATION  OPERATES  THE MITCHELL SMITH DIVISION PLANT,
MHERE THE PRIMARY PRODUCT  IS  CORK RUBBER  GASKET  MATERIAL.   PROCESS  (AUTOCLAVE) AND HEATING STEAM
ARE SUPPLIED BY A BOILER RATED  AT 350  BOILER  HP  (ABOUT  3.5  Mw  EQUIVALENT).  STEAM CONDITIONS ARE
125 PSI AT 325 F.  THE BOILER WAS ORIGINALLY  ERECTED  IN 193«»,  BUT UNDERWENT A COMPLETE OVERHAUL IN

1977.  BOILER TUBES, REFRACTORY BRICK,  GRATE,  AND  SOOT  BLOWERS WERE REPLACED DURING THE OVERHAUL.
THE BOILER FIRES COAL SUPPLIED  BY GENERAL COAL - NOMINAL SIZE  IS 1.25 X 0.25 INCHES.  COAL
CHARACTERISTICS ARE AS FOLLOWS:  HHV=13,200 8TU/LB, ASHS6X, AND SULFUR IS LESS THAN IX.
    THE EMISSIONS CONTROL SYSTEM AT SHELLER GLOBE  CONSISTS  OF  A W.W. SLY SINGLE-STAGE IMPINJET
SCRUBBER (*I70) WHICH REMOVES PAHTICULATE AND  502  FROM  THE  FLUE GAS.  THE SYSTEM USES A NAOH MAKE-UP
PRIMARILY FOR CORROSION CONTROL BUT S02 CONTROL  IS AN ADDITIONAL BENEFIT.  RECYCLE TANK SUPERNATANT
IS PH NEUTRALIZED AND IS DISCHARGED TO CITY SEWERS WHILE FLT ASH AND SEDIMENT ARE SETTLED, SCRAPED

OUT AND HAULED TO A SANITARY LANDFILL.
    THE SCRUBBER MODULE IS CONSTRUCTED OF 316L S3  (10 FT DIA X 15 FT HIGH).  THE FLUE GAS RATE ENTE-
RING THE SCRUBBER IS 19,200 CFM d 150 F.  THE OUCTINS ENTERING AND EXITING THE SCRUBBER IS MADE OF

»'•• C.S. AND CORTEN STEEL RESPECTIVELY.  THE ».«. SLY FAN  (BOILER ID)   IS MADE OF CARBON STEEL.
THE RECYCLF TANK IS CONSTRUCTED OF UNLINEO STEEL (20 FT X 10 FT X 8 FT)  AND THE PIPING IS OF  PVC.
CHEMICALS ARE PURCHASED FROM THE CHEMICAL TREATMENT CO. WHO ALSO OPERATE  THE  SCRUBBING SYSTEM.
    REFER TO FIGURE 11-10 IN SECTION la FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.
                                               153

-------
                                                                              STATUS  TO  JANllSUY  1979




                                      SECTION 12 (CONTINUED)




                     INSCRIPTION OF INDUSTRIAL ROILEK FGO SYSTEMS NOT OPERATING




SHELLER GLOBE CORP.! NORFOLK, VIRGINIA (CONTINUED)











                                        OPERATING HISTORY




    UPON INITIAL STARTUP NO CAUSTIC WAS INTRODUCED TO THE SYSTEM AND WITHIN A FEW MONTHS  THF  INTER-




NALS OF THE MODULE AND THE STEEL PIPING SYSTEM WERE CORRODED BEYOND USE.  THIS NECESSITATED REPLACE-




MENT OF THE INTERNALS, SUBSTITUTION OF STFEL PIPE WITH PVC, AND ADDITION OF NAOH TO  THE SCRUBBING




LIQUOR.









2ND OUARTER-1978    DURING THE REPORT PERIOD THE UNIT UNDERWENT A VIRGINIA EPA CERTIFICATION




INSPECTION, AND HAS FOUND TO BE IN COMPLIANCE.  NO SCRUBBER-RELATED PROBLEMS  HAVE OCCURRED.









3RD OUARTER-1978    BOILER OPERATION WAS ESTIMATED TO BE AT 60Z CAPACITY 39 MRS PER  DAY,  b DAYS PER




WEEK.  HO SCRUBBER-RELATED PROBLEMS HAVE BEEN REPORTED.  PLANT PERSONNEL ARE  CONSIDERING  REPLACEMENT




OF THE PRESENT SYSTEM DUE TO WEAR ON THE EQUIPMENT.









«TH OUARTER-1978    NO SCRUBBER RELATED PROBLEMS HERE REPORTED DURING THIS PERIOD.   AT PRESENT, THE




USE OF FRESH NAOH HAS BEEN DISCONTINUED.
                                               151

-------
                                                                             STATUS TO JANUARY 1979
                                      SECTION  13  (CONTINUFO)
                     DESCRIPTION OF  INDUSTRIAL BOHFK FfiO SYSTtMS NOT OPERATIC,
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBER OF SEPARATE FGO UNITS
  NUMBER OF BOILFRS BEING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  SOZ REMOVAL EFFICIENCY
  HATER MAKE-UP
  SLUD6E OR BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
TRANSCO TEXTILES, INC.
AUGUSTA, r.f-OHHIA
FUEL OIL (21 MAX. SULFUR)
50,000 ACFM
 1
 1
SO  MK (EQUIVALENT)
(FOR THIS REPORT, UNLESS STATED OTHERWISE,  ZOOO SCFM = 1  FOUIVALENT MW.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
FMC ENVIRONMENTAL EQUIPMENT
SODIUM CARBONATE SCRUBBING
NEW
MARCH, t<»75
INOEFINITFLY SHUT DOWN
BOX-85Z (610 LB/HR S INLET)
48  GPM; OPEN LOOP
WASTEHATER TREATMENT AND DISCHARGE TO RIVER
NA2S03/S04 LIQUOR DISCHARGED TO A HOLDING POND
SEE SECTION J3 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND  INFORMATION
    THE FGD OPERATIONS HAVE BEEN TERMINATED  FOR  AN  INDEFINITE PERIOD.  THE PLANT BURNS NUMBER 6
FUEL OIL AND THE SULFUR DIOXIDE EMISSIONS  ARE 501 OF  THE EXISITING REGULATIONS.  THF BOILFR IS
RATED AT 20 MH (EQUIVALENT) AND PRODUCES 150,000 LBS/HR STEAM.  WHEN OPERATIONAL, THE SCRUBBER
SYSTEM MAD A FLUE GAS VOLUME OF 50,000  ACFM  AT  140  DEGREES F.  SYSTEM START-UP OCCURRED IN MARCH
1975 AND SCRUBBER OPERATIONS WERE  TERMINATED LATER  IN THE SAME YEAR.  THERE ARE CURRENTLY NO PLANS
TO INITIATE OPERATIONS.
                                               155

-------
                                                                              STATUS TO JANUARY I97«J
                                            N  1?  CCOfvTlNUFl))
                     neSCRIPT !'"'< OF  INDUSTRIAL BOILEH FGU  SYSTEMS  NOT  OPERATING
  INSTALLATION NAMI-
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBER OF SEPARATE FGD UNITS
  NUMBER OF BOILERS 8EIN6 CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  802 REMOVAL EFFICIENCY
  PARTICIPATE REMOVAL EFFICIENCY
  HATER MAKE-UP
  SLUDGE OR BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
U.S. GYPSUM CORP.
OAKMONT, PENNSYLVANIA
COAL
J<»,BOO SCFM (TOTAL - 1 BOILERS)
 1
 a
10 HVs (EQUIVALENT)
(FOR THIS REPORT, UNLESS STATED OTHERWISE,  2000  SCFM  =  1  EQUIVALENT HH,
THIS TS BECAUSE GAS FLOW RATE  IS THE PRIMARY FACTOR IN  MODULE SIZING.)
AIRPOL INDUSTRIES
DOUBLE ALKALI (DILUTE)
NEM


NEVER STARTED-UP
SUFFICIENT TO MEET REGULATION
MEETS CODE
10 6PM (CLOSED LOOP)
DEMATERED SLURRY TO LANDFILL
SLUDGE TO POND FOR DRYING.  THEN TO LANDFILL.
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
    AN AIRPOL DOUBLE ALKALI SCRUBBING SYSTEM IS ON-SITE, INSTALLED,  AND READY  FOR  OPERATIONS.
HOWEVER, IIS GYPSUM DECIDED NOT TO INITIATE PRODUCTION AT THIS FACILITY FOR  ECONOMIC  REASONS.  A
CHECK DURING THE «TH QUARTER 1<978 REPORT PERIOD REVEALED THAT THERE  ARE STILL  NO PLANS TO USE  THIS
FACILITY.
                                                156

-------
                                                                            STATUS TO JANUARY 1979

                                            SECTION  13

                                    INDUSTRIAL  ROILFk FRO COSTS




COMPANY                          PROCESS                                           COST
LOCATION                         STATUS                                   	_.	
CAPACITY (RCFM)                  START-UP  DATE                            CAPITAL        OPERATING
ALYESKA PIPELINE SERVICE CO.     SODIUM  HYDROXIDE  SCRUBBING
VALDEZ, ALASKA                   OPERATIONAL
50»000                            6/77

                      PLANT PERSONNEL HAVE NOT  SEPARATED OUT FGO SYSTEM
                      COSTS FROM OVERALL  PROJECT  COSTS  NOR 00 THEY KEEP
                      OPERATING  COSTS FOR THE FED SYSTEM.
AMERICAN THREAD CO.              CAUSTIC  WASTE  STREAM                    $138,000.        St6>300.
MARION, NORTH CAROLINA           OPERATIONAL
18,500                           1973

                      THE  CAPITAL  COST REPRESENTS  TOTAL  INSTALLED COST
                      IN 1972  DOLLARS.   THE  OPERATING COST  INCLUDES NEW
                      FIBERGLASS LININGS IN  DUCTWORK AND ON FANS AND
                      OPERATING  LABOR AND MATERIALS FOR  1977.
ARCO/PRLYMERS, INC.              DOUBLE  ALKALI  (CONCENTRATED}           $6,000,000.    121,000,000.
MONACA, PENNSYLVANIA             CONSTRUCTION
236,000                           6/80

                       THE  CAPITAL COST  REPRESENTS  THE  TOTAL  INSTALLED
                       COST INCLUDING EQUIPMENT,  INSTALLATION,  DUCTWORK,
                       STACK,  PIPING, ENGINEERING,  START-UP,  TESTING,
                       INSTRUMENTATION,  ENGINEERING,  AND  OVERHEADS  IN
                       1978 DOLLARS.  THE  PROJECTED OPERATING COST  IS
                       S8/TON  OF  COAL.
ARMCO STEEL                      LIME  SCRUBBING                           $70,000.
MIDOLETOHN, OHIO                 OPERATIONAL
84,000                           1975

                       THIS  IS  THE  REPORTED CAPITAL  COST  IN  1975 DOLLARS.
BELRID6E OIL CO.                 SODIUM  HYDROXIDE  SCRUBBING              $125,000.
MCKITTRICK, CALIFORNIA           CONSTRUCTION
12,000                            1/79

                      THIS  IS  THE REPORTED  CAPITAL  COST  IN  1978 DOLLARS.
                                               (57

-------
                                                                             STATUS  TO  JANUARY  197<»
                                     SECTION  U  (CONTINUFn)

                                    INDUSTRIAL BOILFR FCO COSTS
COMPANY
LOCATION
CAPACITY (SCFM)
          PROCESS
          STATUS
          START-UP DATE
            COST

   CAPTTAL        OPERATING
8ELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA
ia,ooo
          SODIUM HYDROXIDE SCRUBBING
          OPERATIONAL
           b/78

THE CAPITAL COST INCLUDES THE SCRUBBFR, RECYCLE
TANK, STACK, OEMISTER. PIPING, DUCTWORK, AND
INSTRUMENTATION IN 1<»78 DOLLARS.
                                                                         $100,000.
BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA
12,000
          SODIUM HYDROXIDE SCRUBBING              $100,000.
          OPERATIONAL
           7/78

THIS IS THE REPORTED CAPITAL COST IN 1978 DOLLARS.
BUNGE, INC.
CAIRO, ILLINOIS
44,000
          LIME SCRUBBING
          INDEFINITELY SHUT DOWN
           9/77
11,000,000.
                      THE CAPITAL COST REPRESENTS THE TOTAL INSTALLED
                      COST OF THE FGD SYSTEM, ENGINEERING, START-UP, AND
                      TESTING IN 1977 DOLLARS.
CANTON TEXTILES
CANTON. GEORGIA
as,ooo
          CAUSTIC WASTE STREAM                    1138,000.
          OPERATIONAL
           fa/70


THE CAPITAL COST REPRESENTS THE TOTAL COST FOR THE
INSTALLED SYSTEM, IN 1970 DOLLARS.
                   J30.000.
                                               158

-------
                                                                             STATUS  TO JANUARY  1979

                                      SECTION  I*  (CONTINUED)

                                    INDUSTRIAL  HIIILFM  FRO  COSTS
COMPANY                          PROCESS                                           rr.cT
LOCATION                         STATUS                                   	_„..
                                 START-.IP  PATE                            CAPTTAl        OPFHAT TKT.
CATERPILLAR TRACTOR CO.          ROUBLE  ALKALI  (CONCENTRATED)
EAST PEORIA, ILLINOIS            OPERATIONAL
310,000                  •         «/7»

                      .NO ECONOMIC" INFORMATION  HAS  BEEN  SUPPLIED  FOR  THE
                      CATERPILLAR FGf> SYSTEMS.
CATERPILLAR TRACTOR CO.          DOUBLE  ALKALI  (OTLUTE)
JOLIET, ILLINOIS                 OPERATIONAL
67,000                            9/74

                      NO ECONOMIC INFORMATION  HAS  BEEN  SUPPLIED  FOR  THE
                      CATERPILLAR FGD SYSTEMS.
CATERPILLAR TRACTOR CO.          DOUBLE  ALKALI  (CONCENTRATED)
MAPLETON, ILLINOIS               CONSTRUCTION
131,000                           1/79

                      NO ECONOMIC INFORMATION  HAS  BEEN  SUPPLIED  FOR  THE
                      CATERPILLAR F60 SYSTEMS.
CATERPILLAR TRACTOR CO.          DOUBLE  ALKALI  (OTLUTE)
MORTON, ILLINOIS                 OPERATIONAL
38,000                            1/78

                       NO ECONOMIC INFORMATION  HAS  BEEN  SUPPLIED  FOR  THE
                       CATERPILLAR FSO SYSTEMS.
CATERPILLAR TRACTOR CO.          DOUBLE  ALKALI  (CONCENTRATED)
HOSSVILLE. ILLINOIS              OPERATIONAL
140,000                          10/75

                      NO ECONOMIC  INFORMATION  HAS  BEEN  SUPPLIED FOR  THE
                      CATERPILLAR  FGD SYSTEMS.
                                               159

-------
                                                                            STATUS TO JANUARY  1979
                                     SECTION 11  (CONTINUFlO

                                   INDUSTRIAL BUILFH FRO COSTS
COMPANY
LOCATION
CAPACITY CSCFM)
          PROCESS
          STATUS
          START-UP PATE
                                                                                  COST
 CAPITAL
                OPERATING
CHANSLOR WESTERN OIL K OEV. CO  DOUBLE ALKALI
BAKERSFIELO, CALIFORNIA         CONSTRUCTION
70,000                           3/79
                                               tCONCENTRATEO)
                                                                      11,500,000.
                      THE CAPITAL COST INCLUDES THE SCRUBBER, LIOUOR
                      REGENERATION EQUIPMENT, ANO DUCTWORK IN 1978
                      OOLLARS.
CHEVRON U.S.A. INC.
BAKERSFIELD, CALIFORNIA
248,000
          SODIUM CARBONATE SCRUBBING
          OPERATIONAL
           7/78
                                                                      12,600,000.
                                                                                        1930,000.
                      THE CAPITAL COST IS IN J978 DOLLARS.  THIS REPRE-
                      SENTS THE TOTAL INSTALLED COST OF THE FGO SYSTEM
                      INCLUDING SITE PREPERATION.  THE OPERATING COST
                      INCLUDES ELECTRICITY, SODA ASH, AND MAINTENANCE
                      (LABOR AND MATERIALS).  THIS CORRESPONDS TO A 340
                      DAY YEAR AND APPROXIMATELY SOOO/DAY PER SCRUBBER
                      IN 1978.
FIRESTONE TIRE AND RUBBER co.
POTTSTOWN, PENNSYLVANIA
8070
          DOUBLE ALKALI (CONCENTRATED)
          OPERATIONAL
           1/75
•163,000.
                                                                                          $60,000.
                      THE CAPITAL COST INCLUDES EQUIPMENT, ENGINEERING
                      ANO STARTUP.  THE COST DOES NOT INCLUDE LABOR AND
                      MATERIALS FOR ELFCTRTCAL SYSTEM, PIPING, OR STRUC-
                      TURAL AND FOUNDATIONS ERECTION IN 1974 DOLLARS.
                      THE OPERATING COST INCLUDES CHEMICALS, LABOR,
                      ELECTRICITY, DISPOSAL, MATERIALS, AND LAB WORK FOR
                      1977.
FHC (SODA ASH PLANT)
GREEN RIVER, WYOMING
446,000
          SODIUM CARBONATE SCRUBBING           S10,000,000.
          OPERATIONAL
           5/76

THIS TOTAL CAPITAL COST, IN 1975 DOLLARS,
INCLUDES ESP ANO FGD PURCHASE AND INSTALLATION
COSTS.
                                               160

-------
                                                                            STATUS TO JANHAkY 1979
COMPANY
tOCATION
CAPACITY (SCFM)
GENERAL MOTORS CORPORATION
DAYTON, OHIO
36.000
                                     SECTION  I?  (CONTINUED)

                                    INDHSTklAL HOllF* KGO COSTS
PROCFSS
STATUS
ST4M-IIH DA1E
                                   COST
SODIUM HYDROXIDE SCRUBBING
OPERATIONAL
 9/7 fl
                                                                         CAPITAL
                          1668,000.
                                                                                        OPEHATING
                      THE CAPITAL COST  IS  THF  TOTAL  INSTALLED COST FOR
                      THE T*0 FRO SYSTEMS,  IN  197a DOLI ARS.
GENERAL MOTORS CORPORATION
PARMA, OHIO
128,400
DOUBLE ALKALI
OPERATIONAL
 1/70
(DILUTE)
                        S3,ZOO,000.
                                         S6ia,000.
                      THE  OPERATING  COST  REPRESENTS SH.70/TON COAL.
GENERAL MOTORS CORPORATION
PONTIAC, MICHIGAN
107,300
SODIUM HYDROXIDE SCRUBBING
OPERATIONAL
 4/76
                          1600,000.
                      THE CAPITAL  COST  REPRESENTS  THE TOTAL  INSTALLED
                      COST  IN  1972 DOLLARS.
GENERAL MOTORS CORPORATION
ST. LOUIS, MISSOURI
64,000
SODIUM HYDROXIDE SCRUBBING
OPERATIONAL
1978
                                                                        1773,000.
                                                                                        S17S,000.
                       THE  CAPITAL  COST  IS  IN  1973  DOLLARS.   THE OPERAT-
                       ING  COST  INCLUDES MAINTENANCE  MATERIALS, LABOR AND
                       ELECTRICITY  IN  1976.
GENERAL MOTORS CORPORATION
TONOWANDA, NEW YORK
9Z,000
SODIUM HYDROXIDE SCRUBBING
OPERATIONAL
 6/75
                                                                        ,200,000.
                       THE  CAPITAL  COST  IS  IN  1974  DOLLARS.
                                               161

-------
                                                                            STATUS TO JANUARY  1979

                                     SECTION 13  (CONTINUED)

                                   INDUSTRIAL BOILER FRO COSTS



COMPANY                         PROCESS                                           COST
LOCATION                        STATUS                                   .„.._._.—.——.———
CAPACITY (SCFM)                 START-UP DATE                            CAPITAL        OPERATING
GEORGIA-PACIFIC PAPER CO..       CAUSTIC HASTE STREAM                    $275,000.
CROSSETT, ARKANSAS              OPERATIONAL
320,000                          7/75

                      THE CAPITAL COST REPRESENTS THE ABSORBER COST ONLY
                      AND IS IN 1974 DOLLARS.
BETTY OIL COMPANY               SODIUM CARBONATE SCRUBBING              $400,000.       $390,000.
BAKERSFIELD, CALIFORNIA         OPERATIONAL
72,000                           b/77

                      THE CAPITAL COST INCLUDES THE ABSORBER MODULE,
                      SODA ASH TANK, PUMPS, AND PIPING IN 1977 DOLLARS.
                      IT DOES NOT INCLUDE THE STACK, DUCTING, ENGINEER-
                      ING, OR OVERHEADS.  THE OPERATING COST IS EQUIV-
                      ALENT TO S0.16/MM BTtI, INCLUDES THE COST FOR
                      SODA ASH, ELECTRICITY, AND SCRUBBER MAINTENANCE,
                      AND REPRESENTS A 340-DAY YEAR.
BETTY OIL COMPANY               SODIUM CARBONATE SCRUBBING            $2,500,000.     12,900,000.
BAKERSFIELO, CALIFORNIA         OPERATIONAL
•95,000                         12/78

                      THE CAPITAL COST INCUDES COST OF SCRUBBER, SODA
                      ASH TANK, PIPING, AND PUMPS TN 197B HOLLARS FOR
                      5 SCRUBBER SYSTEMS.  THE OPERATING COST INCLUDES
                      ELECTRICITY, SCRUBBER MAINTENANCE, AND SODA ASH,
                      IS BASED ON A 340-DAY YEAR, AND REPRESENTS
                      S0.16/MM BTU FOR 5 SCRUBBING UNITS.
BETTY OIL COMPANY               SODIUM CARBONATE SCRUBBING            12,000,000.     S2,S20,OOU.
BAKERSFIELD, CALIFORNIA         CONSTRUCTION
396,000                          1/79

                      THE CAPITAL COST INCLUDES COST OF SCRUBBER, SODA
                      ASH TANK, PIPING, AND PUMPS IN 1978 DOLLARS FOR
                      4 SCRUBBER SYSTEMS.  THE OPERATING COST INCLUDES
                      ELECRICITY, SCRUBBFR MAINTENANCE, AND SODA ASH,
                      IS BASER ON A 340-DAY YEAR, AND REPRESENTS
                      S0.16/MM BTU FOR 4 SCRUBBING UNITS.
                                              163

-------
                                                                            STATUS 10 JANUARY 1979

                                     SECTION  1?  (CONTINUED)

                                    INDUSTRIAL BUTLFB Ffil) COSTS



COMPANY                         PROCESS                                           rniT
LOCATION                        STATUS                                   	 . .
CAPACITY (SCFH)                 START-UP DATE                            CAPITAL        OPFkATTNG
GREAT SOUTHERN PAPER CO.        CAUSTIC WASTE STREAM                    $600,000.
CEDAR SPRINGS, GEORGIA          OPERATIONAL
420,000       .         •        1975

                      .THE CAPITAL" COST  is  THE EQUIPMENT COST FOR THE TWO
                      SCRUBBEK MODULES  IN  1970 DOLLARS.
6REAT WESTERN SUGAR              AMMONIA-LADEN  PROCESS WATER
BILLINGS, MONTANA                OPERATIONAL
60>000                           10/77

                      NO COST  INFORMATION  HAS  BEEN  SUPPLIED FOR  THE
                      BILLINGS FGD  SYSTEM.
GREAT WESTERN SUGAR              AMMONIA-LADEN  PROCESS  HATER             3707,000.        $88,200.
FORT MORGAN, COLORADO            OPERATIONAL
65,a30                           10/76

                      THE CAPITAL  COST  IS  THE  TOTAL  INSTALLED COST OF
                      THE FGO  SYSTEM  IN 1976 DOLLARS.   THE OPERATING
                      COST  INCLUDES ELECTRICITY,  STEAM, MAINTENANCE,
                      LAABOR,  AND  MATERIALS.
6REAT WESTERN SUGAR              AMMONIA-LADEN  PROCESS  WATER             $693,000.        $3U,60u.
BERING, NEBRASKA                 OPERATIONAL
110,000                          tO/75

                       THE CAPITAL  COST  IS  THE  TOTAL  INSTALLED COST OF
                       THE F60  SYSTEM  IN 1975 DOLLARS.   THE OPERATING
                       COST  INCLUDES ELECTRICITY,  MAINTANENCE, LABOR, ANO
                       MATERIALS.
GREAT WESTERN SUGAR              AMMONIA-LADEN  PROCESS WATER
6REELEY, COLORADO                OPERATIONAL
25,000                           10/75

                      NO COST  INFORMATION  HAS  BEEN  SUPPLIED FOR THF
                      GREELEY  FGD  SYSTEM.
                                               161

-------
                                                                            STATUS TO JANHAHY

                                     SECTION 1?  (CniJTfMUFD)

                                   INDUSTRIAL flUTLF" FGD COSTS



COMPANY                         PKOCFSS                                           COST
LOCATION                        STATUS                                   	»———	
CAPACITY (SCFM)                 START-UP PATE                            CAPITAL        OPERATING
GREAT WESTERN SUGAR             AMMONIA-LADEN PROCESS WATER
LON6MONT, COLORADO              TERMINATED
SCFM-N/A                        10/73

                      NO COST INFORMATION HAS BEEN SUPPLIED FOR THE
                      LONGMONT F6D SYSTEM.
GREAT WESTERN SUGAR             AMMONIA-LADEN PROCESS HATER             §431,000.         s8Q,aoo.
LOVELAND, COLORADO              OPERATIONAL
lai.eoo                         10/73

                      THE CAPITAL COST REPRESENTS THE TOTAL  INSTALLED
                      COST FOR TWO SCRUBBERS, I.D. FANS, NEW BREECHING,
                      AND WATER SYSTEM IN 1973 DOLLARS.  THE OPERATING
                      COST INCLUDES ELECTRICITY, STEAM, MAINTANENCE,
                      LABOR, AND MATERIALS.
GREAT WESTERN SUGAR             AMMONIA-LADEN PROCESS WATER             $523,000.         $30,200.
SCOTTS BLUFF, NEBRASKA          OPERATIONAL
 65,230                          10/75

                      THE CAPITAL COST IS THE TOTAL INSTALLED COST OF
                      THE FGO SYSTFM IN 1975 DOLLARS.  THE OPERATING
                      COST INCLUDES ELECTRICITY, STEAM, MAINTANENCE,
                      LABOR, AND MATERIALS.
HARRIS MINING CO.               HATER SCRUBBING  (NA,NH3 OPTN.)            $31,000.
SPRUCE PTNF, NORTH CAROLINA     INDEFINITELY SHUT DOWN
1,000                           1973

                      THE CAPITAL COST tS THE TOTAL INSTALLED COST  IN
                      1973 DOLLARS.
ITT RAVONIFR, INC.              SODIUM HYDROXIDE SCRUBBING               5500,000.
FERNANDINA BEACH, FLORIDA       OPERATIONAL
176,000                         1975

                      THE CAPITAL COST IS FOR Z SCRUBBERS, DUCTWORK,
                      AND STACKS  IN 1975 DOLLARS.
                                               164

-------
                                                                            STATUS  TO JANUARY  1979
                                      SECTION  13  (CONTINUED)

                                               RIUI.FH  FSII
COMPANY
LOCATION
CAPACITY  (SCFM)
          PROCESS
          STATUS
          START-HP DATF
          COST

 CAPITAL         OPERATING
KERR-MCGFF CHFMICAL CORP.
TRONA, CALIFORNIA
490,000
          SODIUM CAKBONA-TE SCRUBBING
          OPERATIONAL
           b/7B
,00(1,0(1 (I.
                       KERR-MCGFE  SPENT $1.5 MM IN A  PILOT PLANT  FUR
                       SEVERAL  YEARS BEFORE  AND DURING CONSTRUCTION OF
                       THE  NEW  FACILITY.  OUT OF THE  SSOO MM PROJECT
                       COST,  Sib MM OF THAT  IS FOR POWER PLANT  AND $6 MM
                       TS FOR THE  BOILER'S RfLATEO POLLUTION CONTROL
                       COSTS.
MEAD PAPEHROARO CO.
STEVENSON, ALABAMA
100,000
          SODIUM CARBONATE SCRUBBING              S173,000.
          OPERATIONAL
          t<»75

THE CAPITAL COST REPRESENTS THE ORIGINAL EQUIPMENT
AND INSTALLATION COST IN 1974.  SINCE THEN, EXTEN-
SIVE MODIFICATIONS HAVE BEEN REQUIRED.  ANOTHER
S173,000 MAS SPENT FOR REPAIRS AND UPGRADING IN
1976.  OVER THE SCRUBBER PLANT LIFE, AN ADDITIONAL
1136,000 HAS BEEN SPENT, INCLUDING:* 35,000 (RUB-
BER LINERS), 154,000 (STAINLESS STFFL LINERS), AND
S07.000 (GENERAL REPAIRS).
THE OPERATING COST INCLUDES S4D,000/YR FOR
OPERATING LABOR, S40,000/YR FOR MAINTENANCE
LABOR, AND $760,000/YR FOR REAGENT (B526 TONS).
                1800,000.
MINN-DAK FARMER'S CO-OPERATIVE
WAHPETON, NORTH DAKOTA
164,000
          AMMONIA SCRUBBING
          OPERATIONAL
           6/77
                                                                         5300,000.
                       THE  CAPITAL  COST  REPRESENTS THE  TOTAL  EQUIPMENT
                       COST IN  1977 DOLLARS.
                                               IbS

-------
                                                                            STATUS  TO  JANUARY  1979


                                     SECTION n  (CONTINUFin


                                   INDUSTRIAL BOILER FRO COSTS
COMPANY                         PROCESS                                           COST
LOCATION                        STATUS	
CAPACITY CSCFM)                 START-UP DATE                            CAPITAL         OPERATING
MOBIL OIL COMPANY               SODIUM CARBONATE SCRUBBING               $500,000.
BUTTONHILLOW, CALIFORNIA        CONSTRUCTION
80,500                           2/11

                      THE CAPITAL COST INCLUDES ABSORBER MODULES, RE-
                      CYCLE TANKS, STACK, OEMISTERS, PUMPS, ANO PIPING
                      IN 1978 DOLLARS.  IT DOES NOT INCLUDE CAUSTIC
                      TANK, FEED PUMPS, OR FEED PIPES.
MOBIL OIL COMPANY               SODIUM HYDROXIDE SCRUBBING            13,900,000.      $1,290,000.
SAN AROO, CALIFORNIA            OPERATIONAL
175,000                         1970


                      THE CAPITAL COST REPRESENTS EQUIPMENT, INSTAL-
                      LATION, PIPING, DUCTWORK, STACK, MATER TREATMENT
                      FACILITY, AND INSTRUMENTATION IN 1978 DOLLARS.
                      THE OPERATING COST INCLUDES ELECTRICITY, CAUSTIC,
                      LAOOR, AND MAINTENANCE.  IT DOES NOT INCLUDE IN-
                      DIRECT (FIXED) COSTS.  THE AVERAGE OPERATING COST
                      FOR THE ?a SMALLER SYSTEMS IS $35,000/YR EACH, AND
                      FOR THE « LARGER SYSTEMS IS S65.000/YR EACH.
NEKOOSA PAPERS, INC.            CAUSTIC SCRUBBING                       $850,000.
ASHDOHN, ARKANSAS               OPERATIONAL
211,000                          3/76


                      THE CAPITAL COST REPRESENTS THE EQUIPMENT COST  IN
                      1975 DOLLARS.
NORTHERN OHIO SUGAR COMPANY     SODIUM CARBONATE SCRUBBING              $523,000.         $30,200.
FINDLAY, OHIO                   TERMINATED
65,230                          10/74

                      THE CAPITAL COST IS THE TOTAL INSTALLED COST OF
                      THE FGD SYSTEM IN 1974 DOLLARS.  THE OPERATING
                      COST INCLUDES ELECTRICITY, MAINTENANCE, LABOR, ANO
                      MATERIALS.
                                               166

-------
                                                                            STATUS TO JANUAKY  1973
COMPANY
LOCATION
CAPACITY  CSCFM)
NORTHERN OHIO SUGAR  COMPANY
FREEMONT, OHIO
40,000
                                      SFCTION  J?  (CONTINUED)

                                    INDUSTkTAL  HtHLFK FGU COSTS
          PROCESS
          STATUS
          START-UP DATF
            COST
                                                                          CAPITAL
          SODIUM HYDROXIDE SCRUBBING
          OPERATION*!
          10/75
                       NO  COST  INFORMATION HAS  BEEN  SUPPLIER  FOR  THE
                       FHEEMONT  FGO  SYSTEM.
PHILLIP MORRIS,  INC.
CHESTERFIELD, VIRGINIA
39,000
          SODIUM CARBONATE SCRUBBING
          CONSTRUCTION
           h/79

NO COST INFORMATION IS AS YET AVAILABLE.
RICKENBACKER  AIR  FORCE  BASE
COLUMBUS, OHIO
55,000
          LIMESTONE SCRUBBING
          OPERATIONAL
           3/76
12,200,000.
                  1207,000.
                       THE  CAPITAL  COST  INCLUDES ADJACENT  ELECTRICAL  SUB-
                       STATION,  SLUDGE DISPOSAL, EXTERNAL  FLUES-,  AND
                       OTHER ATYPICAL EOUIPMENT IN 1975 DOLLARS.   THE OP-
                       ERATING COST REPRESENTS THE OVERALL 1977 COST  FOR
                       15,000 TONS  OF COAL.   DURING THE 1977  U.S.E.P.A.
                       DEMONSTRATION TESI,  OPERATING COSTS WERE S5.6I/TON
                       OF COAL.   THESE COSTS INCLUDE OPERATING AND MAIN-
                       TENANCE,  LABOR, POWER,  MATER, MAINTENANCE  PARTS,
                       AND  SLUDGE DISPOSAL,  BUT DOES NOT INCLUDE  DEPRE-
                       CIATION.
SHELLER GLOBE CORP.
NORFOLK, VIRGINIA
8,000
          SODIUM HYDROXIDE SCRUBBING               ISO,000.
          INDEFINITELY SHUT POWN
          1975

THE CAPITAL COST IS THE ESTIMATED REPLACEMENT COST
IN 197B.  AN ESTIMATED MAINTENANCE COST OF S160/NO
HAS REPORTED 
-------
                                                                            STATUS TO JANUARY  1979

                                     SFCT1MN I 3 (rnNTINUeo)

                                   INDUSTRIAL RlllLFK FRO COSTS



COMPANY                         PROCESS                                           COST
LOCATION                        StAIHS	—
CAPACITY (SCFM)                 START-HP OAtE                            CAPITAL        OPERATING
ST. JOF. 7INC CO.                CITRATE PROCESS                      $13,700,000.
MONACA, PENNSYLVANIA            CONSTRUCTION
143,000                          3/71

                      THE CAPITAL COST IS IN 1977 DOLLARS AND IS BEING
                      JOINTLY FUNDED BY ST. JOE ZINC, THE US EPA, AND
                      THE U.S. BUREAU OF MINES.
ST. REGIS PAPER CO.             CAUSTIC SCRUBBING                       $100,000.
CANTONMENT, FLORIDA             OPERATIONAL
115.000                         1973

                      THE CAPITAL COST IS FOR THE ABSORBER ONLY AND  IS
                      IN 1973 DOLLARS.
SUN PRODUCTION COMPANY          SODIUM HYDROXIDE SCRUBBING              $100,000.         $35,000.
FELLOHS, CALIFORNIA             CONSTRUCTION
6,000                            4/79

                          THE CAPITAL COST IS THE TOTAL INSTALLED COST
                      OF THE FGO SYSTEM IN 1979 DOLLARS.  THE ESTIMATED
                      OPERATING COST INCLUDES ONLY DIRECT COSTS OF RAW
                      MATERIALS (SO LB/HR OF SO X CAUSTIC, 4 GPM MAKEUP
                      MATER), AND ELECTRICITY t\f> HP).
SUN PRODUCTION COMPANY          SODIUM HYDROXIDE SCRUBBING              $100,000.         $35,000.
OILDALE, CALIFORNIA             CONSTRUCTION
6,000                            4/79

                          THE CAPITAL COST IS THE TOTAL  INSTALLED COST
                      OF THE F6D SYSTEM IN 197<» DOLLARS.  THE ESTIMATED
                      OPERATING COST INCLUDES ONLY DIRECT COSTS OF  RAW
                      MATERIALS (50 L8/HR OF 501 CAUSTIC, 4 GPM MAKEUP
                              AND ELECTRICITY u& HP).
                                               I6H

-------
                                                                             STATUS  TO  JANUARY  197<»

                                      SECTION  H  (CONTINUED)

                                    INOUSTMAL  BOILFH  FP-II  COSTS


COMPANY                          PROCESS                                           rf,sr
LOCATION                         STATUS                                    	'.	
CAPACITY (SCFM)                  START-HP  0»TF                             CAPITAL         OPERATING
TEXACO INCORPORATE!!              SODIUM  HYDROXIDE  SCKIJHBING
SAN ARDO. CALIFORNIA             OPERATIONAL
380,000                          U/7S

                      NO  ECONOMIC  INFORMATION  HAS AS  YFI  HEEN  PROVIDED
                      BY  TEXACO.
TEXACO INCORPORATED              SOOIIIM CARBONATE  SCRUBBING
SAN AROO, CALIFORNIA             CONSTRUCTION
117,000                           J/79

                       NO  ECONOMIC INFORMATION HAS AS  YET  BEEN  PROVIDED
                       BY  TEXACO.
TEXASGULF                        SODIUM CARBONATE SCRUBBING
GRANGER, WYOMING                 OPERATIONAL
140,000                           4/76

                       THE  CAPITAL COST IS FOR TMO SCRUBBING UNITS ONLY
                       AND  IS  IN 1976 DOLLARS.
TRANSCO TEXTILES.  INC.           SODIUM CARBONATE SCRUBBING
AUGUSTA, SEORSIA                 INDEFINITELY SHUT DOWN
50,000                            J/75

                      NO ECONOMIC INFORMATION MAS MADE AVAILABLE,
U.S. GYPSUM CORP.                DOUBLE ALKALI (DILUTE)
OAKMONT, PENNSYLVANIA            NEVER STARTEO-IJP
19,300
                       NO  ECONOMIC INFORMATION WAS MADE AVAILABLE.
                                               169

-------
                       LIST OF FIGURES
                                                       PAGE
14-1   ALYESKA PIPELINE SERVICE CO.                    174




14-2   AMERICAN THREAD CO.                             175




14-3   ARCO/POLYMERS , INC.                             176




14-4   ARMCO STEEL                                     177




14-5   CANTON TEXTILES                                 178




14-6   CARBORUNDUM ABRASIVES                           179




14-7   CATERPILLAR TRACTOR CO., EAST PEORIA            180




14-8   CATERPILLAR TRACTOR C0.f JOLIET                 182




14-9   CATERPILLAR TRACTOR CO., MORTON                 184




14-10  CATERPILLAR TRACTOR CO., MOSSVILLE              186




14-11  CHANSLOR WESTERN OIL & DEV. CO.                 187




14-12  CHEVRON U.S.A. INC.                             188




14-13  FIRESTONE TIRE AND RUBBER CO.                   189




14-14  FMC  (SODA ASH PLANT)                            190




14-15  GENERAL MOTORS CORPORATION, DAYTON              191




14-16  GENERAL MOTORS CORPORATION, PARMA               192




14-17  GENERAL MOTORS CORPORATION, PONTIAC             193




14-18  GENERAL MOTORS CORPORATION, TONOWANDA           194




14-19  GEORGIA-PACIFIC PAPER CO.                       195
                              171

-------
                 LIST OF FIGURES (continued)






NO.                                                    PAGE




14-20  GETTY OIL COMPANY                               196




14-21  GETTY OIL COMPANY                               197




14-22  GREAT SOUTHERN PAPER CO.                        198




14-23  GREAT WESTERN SUGAR, BILLINGS                   199




14-24  GREAT WESTERN SUGAR, FINDLEY                    200




14-25  GREAT WESTERN SUGAR, FORT MORGAN                201




14-26  GREAT WESTERN SUGAR, FREEMONT                   202




14-27  GREAT WESTERN SUGAR, GERING                     203




14-28  GREAT WESTERN SUGAR, GREELEY                    204




14-29  GREAT WESTERN SUGAR, LOVELAND                   205




14-30  GREAT WESTERN SUGAR, SCOTTS BLUFF               206




14-31  ITT RAYONIER, INC.                              207




14-32  KERR-MCGEE CHEMICAL CORP.                       208




14-33  MEAD PAPERBOARD CO.                             209




14-34  MINN-DAK FARMER'S COOP.                         210




14-35  MOBIL OIL COMPANY, BUTTONWILLOW                 211




14-36  MOBIL OIL CORP., SAN ARDO                       212




14-37  NEKOOSA PAPERS, INC.                            213




14-38  PHILLIP MORRIS, INC.                            214 ,




14-39  RICKENBACKER AIR FORCE BASE                     215




41-40  SHELLER GLOBE CORP.                             216




14-41  ST. JOE ZINC CO.                                217
                              172

-------
                 LIST OF FIGURES (continued)






NO.                                                    PAGE




14-42  ST. REGIS PAPER CO.                             219




14-43  TEXACO, INC., SAN ARDO                          220




14-44  TEXACO, INC., SAN ARDO                          221




14-45  TEXASGULF                                       222
                               173

-------
              
  FlUt Utt III
Y       PI    PL-m —
 bL^	^nJJS-^^-*
                                                    I>UMT
Figure 14-1.   Alyeska Pipeline  Service  Co.
                                                                                        EQUIPMENT LIST
EQ NO.
Al
M
Mtl
PI
fi
n
Tl
it
T3
T4
HAW
ABSORBER
l.D. FAN
HIST ELIMINATOR
REC1RCULATIOH
PUMP
BUED-OFF
PUHP
HAKE -UP
PUHP
RECIRCULATION
TANK
MAKE-UP TANK
AERATOR
NEUTRALIZATION
TANK
SIZE, FEET










MATERIAL










NO.
2
2
2
2
1
1
1
1
1
1
GAS STREAH NO.
RATE. Ib/hr i 1000
icf* x 1000
PARTICULATES. Ib/hr
SOj, tb/hr
TEMPERATURE. *F
HJO, Ib/hr
02. i
NO,, Ib/hr
VELOCTTT, ft/Sic

CD










(?)










(?)










(£) LIQUID STREAM NO.
RATE. Ib/hr « 100
9(«
TOTAL SOI IDS, S
pH
TEMPERATURE, *F
HjO, Ib/hr
SULFITE, ag/l
SULFATE, «9/l
' CHLORIDE. mg/\
SPECIFIC GRAVITY
®










$

600

8.0






(7)










Ca)

2.0

fl.O






(?)

10








^






















-------
H
-J
Ul
                Figure  14-2.  American Thread Co.
                                                                                    EQUIPMENT LIST
£0 NO.
A1
F1
FZ
PI
P2
T1
NAME
ABSORBER
F.O. FAN
1.0. FAN
RECIRCULATION
PUMP
WASTE PUM>
RECIRCULATION
TANK
SIZE, FEET
10 DIA. x 1Z HIGH
60 HP
60 HP


12 I IZ * 1 HIGH
MATERIAL
304SS, 316SS




3/i" C.S.
«.
Z
Z
z



MS STRCM*.
MTE. Ib/hr « 1000
•eta • 1000
MKTICUtAUS. Ib/hr
Stfe. Ih/Hr
IDVEMTUMEt f
HfO. Ib/Mr
Ot, I
Mfc, Ib/hr
mOCITT, ft/MC

(D

CO


400





(f)

41.2


1)0





qj










(D LIQUID STREW NO.
MTE, Ib/hr x 100
90"
TOTAL SOLIDS, *
(*
TENPCMTWE, *F
H&. Ib/hr
SULFITE, "9/1
SULFAtE. ng/1
CM.OHIDE, «9/l
SPECIFIC GMVITT
C^



2.5






(?)



8.5






0










(D










cf










(^










o










®










O










(9










O










id










6











-------
H
-J
a\
                      TO SH«
                                                          ruti*
                 Figure  14-3.  Areo/Polymers,  Inc.
                                                                                    tQUimiMT LIST
EO HO.
A1
Fl
HI
PI
P2
RF1
SSI
Tl
T2
T3
T«
T5
NAME
ABSORBER
F.D. FAN
MIST ELIMINATOR
RECIRCULAT10N
PUMP
LINE REACTOR
PUMP
ROTARY VACUUM
FILTER
SODA ASH
STORAGE
RECIRCULATION
TANK
LINE REACTOR
THICKENER
SURGE TANK
LINE SLAKER
SIZE. FEET












MATERIAL












NO.
3
3
3
3
3
1

3
3


1
GAS STREAM NO.
RATE, Ik/hr ii 1000
•eta i 1000
MRTICUUHS. Ib/hr
SO?. Ib/hr
TEMPERATURE. *f
H20, Ib/hr
0?, i
NO,. Ib/hr
mociiT. rt/tic

(1)










^










(3)










© LIQUID STREAM NO.
RATE. Ib/hr » 100
9P» '
torn SOLIDS, i
PM
TEMPERATURE. *F
HjO. Ib/br
SULFITE. «g/1
SULFATE, ag/1
CHlORIOEt«j/l
SPECIFIC 6MVITV
(|)










$










•(p










$










(J)










^










9










®










0










ft










^










^










4











-------
         w r3^"""
Figure 14-4.   Armco Steel.
                                                             EQUIHCMT LIST
EQ NO.
A1
F1
PI
Tl
TZ
VI
NAME
ABSORBER
F.D. FAN
RECIRCULATION
PUMP
RECIRCULATION
TANK
LIME SLURRY
HOLD TANK
VENTURI
SUE, FEET
17 DIA.


10,000 GAL.


MATERIAL
C.S., FIBERGLASS
LINED TRAYS. 3161 SS

RUBBER-LINED C.S.
RUBBER-LINED C.S.

316L SS
NO.
1
1
1
1
1
1
CAS STREAM HO.
RATE, Ib/hr « 1000
•eta x 1000
PARTICVLATES, Ib/hr
SO?. 1b/hr
TWERATUtt, *t
H20. Ib/hr
02, S
MV, Ib/hr
VELOCITT, ft/sec

(tj

140


42S





(|)

• 3
33







<3)










(J) LIQUID STREAM NO.
RATE. Ib/hr x 100
90"
TOTAL SOLIDS, S
pH
TEMPERATURE, *F
MjO. Ib/hr
SULFITE. iij/1
SULFATE. nj/1
CHLORIDE, *g/l
SPECIFIC GRAVITY
©

1600








@










©










®

3200








(^










<5»

1600

7.0






($>

100








(gl

1600








®










^










®










(^










$>











-------
-0
00
                                                           RMT
                Figure 14-5.   Canton Textiles.
                                                                                   EQAIIPNENT LIST
EO NO.
Fl
PI
n
n
N
n
si
STl
ti
TZ
TJ
NAME
I.D. FAN
HAKE-OP PUMP
HAKE -UP PUMP
MAKE-UP PUMP
REC1RCUIAT10N
PUMP
BLEED-OFF
PUMP
SEPARATOR
• STACK
RECIRCULATION
TANK
DYE RETENTION
BASIN
DTE COLLECTION
MANHOLE
SUE, FEET









14.979 GAL.

MATERIAL





%
FIBERGLASS
FIBERGLASS



NO.
1
1
1
1
1
1
1
1
1
1
1
GAS STREAM NO.
RATE. Ib/hr x 1000
tcta i 1000
WWTICUUTES. Ib/hr
S0|. Ib/hr
TEMPERATURE. *F
MjO, Ib/hr
02. 1
MX. Ib/hr
VELOCITY, ft/tec
„.-. "?' ." --'
Q)

42
295.2
124.2
410





(J)


24. S
37.3






OP










(4) LIQUID STREAM HO.
RATE, Ib/hr x 100
9P»
TOTAL SOLIDS, t
PH
TEMPERATURE. *F
HjO, Ib/hr
SULFITE. ag/1
SULFATE. ag/l
CHLORIDE, ag/l
SPECIFIC GMKITY
^










(£)



7.5






^

1-291

10.4-
12. t






IS)

201








($)

0-2<»1





152


V










(\S










^










^

1-201

1.0






ft











-------
                                IftUB
 FlUI MS »
Figure 14-6.   Carborundum Abrasives,
                                                                  EQUIPMENT LIST
CO NO.
Al
F)
F2
PI
P2
P3
H
Tl
TZ
VI
HAKE
ABSORBER
F.O. FAN
1,0. FAN
ABSORBER
RECYCLE PUMPS
VENTURI
RECYCLE PUMPS
BLEED-OFF
PUNP
HAKE-UP PUMP
RECIRCULATION
TANK
HAKE-UP TANK
VENTURI
SIZE, FEET
B.S 01A. X 38 HIGH








4 INLET s 13 NIGH
13 IN. THROAT
MATERIAL
316L SS








11H. SS. HASTAUOY M
LININC
NO.
I
1
I
2
1
1
J
1
1
1
CAS STRLAH NO.
RATE, 1b/hr a 1000
Kim i 1000
PART1CULAIES. Ib/hr
SO;, Ib/hr
TEMPERATURE , *F
H20. Ib/hr
02. *
no,, ib/nr
VELOCITY, fl/itc

$

45.8

535.6
3SO





(?)

33.1

26. 6
125





(?)










® LIQUID STREAM NO.
RATE. Ib/hr a 100
9P*
TOTAL SOLIDS. %
pH
TEMPERATURE. *F
HjO. Ib/hr
SULFITE. -9/1
SULFATE, B9/1
CHLORIDE, im/l
SPECIFIC GRAVITY
CD



2.8






©










(?)










(8)

3000








0^)

30
11







Q>

45








0










O





















*d










Id










O










|0>











-------
CO
o
                                                          "DQ®


i


-------
H
00
MS STREAM HO.
KATE, Ib/hr > 1000
•eta x 1000
PARTICULATES. Ib/hr
SO?, Ib/hr
TEMPERATURE , *F
HjO, Ib/hr
Of, *
HO,. Ib/hr
VELOCITY, ft/tec

ty

80

1040
isn





(?)



104






Cp










0 LIQUID STREAM NO.
RATE. Ib/hr x 100
90"
TOTAL SOLIDS, X
pH
TEMPERATURE. *F
HjO, Ib/hr
SULFITE. 09/1
SULFATE. M9/1
CHLORIDE. Bj/1
SPECIFIC GRAVITY
©










®
2.1









CD










®










gp










(^
28. 5









fy










@










fy










fy










<&










<&










nil










LIQUID STREAM NO.
lATE. Ib/hr k 100
«?•
TOTAL SOLIDS, I
PM
TEMPERATURE, *F
HjO. Ib/hr
SULFIU, «9/l
SULFATE. «9/l
CHLORIDE, •}/)
SPECIFIC GRAVITY
©










<9










&
171.2

eo







0










§










O










6










®










^










©










®










(8










®










(Dt










<&










id










S










@










^










<&










                                      Figure 14-7.   (continued)

-------
                                                                       EQUIPMENT USt
      FLUE CAS II
00
(0
FLUE GAS IN
                                   '^J*^
                                   «   %>J
^-iffhTT^Tf     ^
     » I t« |
                                               ,Fj>=, -.


                                               I^l
                                        P7

                                       ^—I
                                        nw
                                        WATER
                                                VR?
                              L.
                                                       LANOMU
                                   LSrJ
                                       V^
        Figure 14-8.  Caterpillar Tractor Co., Joliet.
         (continued)
EO NO.
Al
F)
LSI
PI
n
t3
P4
n
P6
P7
PB
SSI
T1
T2
T3
T4
T5
T6
YM
VF2
VR1
VR2
NAHt
ABSORBER
F.D. FAN
UME STORAGE
TANK
BLEED-OFF PUMPS
LIME NIX TANK
PUMPS
SODA ASH MIX
TANK PUKPS
FEED HATER PUMPS
. SlUDGC PUMP
SLUDGE PUMP
FILTRATE PUMPS
VACUUM PUMPS
SODA ASH STORAGE
TANK
PRIMARY LIME
MIX TANK
SECONDARY LIME
MIX TANK
SODA ASH
MIX TANK
SURGE TANK
THICKENER
CLARIFIER
VACUUM FILTER
VACUUM FILTER
SPARE
VACUUM RECEIVER
VACUUM RECEIVER
SPARE
SIH, FEET
















50,000 GAL





MATERIAL
316 S.S.

C.S.








C.S.
C.S.
C.S.
C.S.
C.S.
C.S.
C.S.
MET SURFACES
304 SS
MET SURFACES
304 SS
C.S.
C.S.
NO.
2
2
1
4
2
2
2
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1

-------
CO
OJ
GAS STREAM M.
KATE. Ib/hr i 1000
tflm i 1000
PART1CUUTCS. Ib/hr
SOz, Ib/hr
TEMPERATURE, *f
HjO. Ib/hr
02. 1
NO*. Ib/hr
VELOCITY, ft/tec

©

57.5

34S.I
ISO





(|)

41.0
22.9
32. 8
130






LIQUID STREAK HO.
RATE. Ib/hr n 100
W"
TOTAL SOLIDS. S
pH
TEMPERATURE. *F
Htf. Ib/hr
SULFITE, Bg/1
SULFATE. ag/1
CHLORIDE. •»/!
SrtCIFIC GRAVITT
Kl










o
52.0

65







(5)

4C.O

241.1
350






^










0 LIQUID STREAN NO.
RATE. Ib/hr x 100
13.2 9P"
15.0 TOTAL SOLIDS, t
23.5 pM
125 TEMPERATURE, ^F
HjO. Ib/hr
SULFITE. ng/1
SULFATE, ag/1
CHLORIDE, ag/l
SPECIFIC GRAVITY

®

.6








^



12.0






<&



12.0






^



12.0






tt)










©










9










(5)










©











@



12.0






@



12.0






@>










O










IS










V
10.4









^
2.9









(|P











^










(^










@










0











<9










ft











d










«



12.0







^










4


15-20









-------
                                                                                     EquimoiT LIST
         nuc US
H
00
         auc MS
                                                           •UWOFIU
          Figure  14-9.  Caterpillar Tractor  Co., Morton,
          (continued)
EOHO.
A1
Fl
LSI
PI
P2
PJ
P4
PS
PC
P7
n
SSI
Tl
TZ
T3
T4
T5
T6
T7
VF1
VFZ
VR1
VR2
NAME
ABSORBER
F.O. FAN
LINE STORAGE
TANK
CITY WATER PUMP
LINE NIX TAHK
PUHPS
FILTER MSH PUMP
FEED HATER PUMPS
SLUDGE PUMP
SLUDGE PUMP
FILTRATE PUMPS
VACUUM PUMPS
SODA ASH STORAGE
TANK
PRIMARY LIME
NIX TANK
SECONDARY LIME
MIX TANK
SOFTENING TANK
SURGE TANK
THICKENER
CLARIFIER
MIX TANK
VACUUM FILTER
VACUUM FILTER
SPARE
VACUUM RECEIVER
VACUUM RECEIVER
SPARE
SUE, FEET























MATERIAL
316 S.S.

C.S.








c.s.
C.S.
c.s.
c.s.
c.s.
C.S. _j-
c.s.

WET SURFACES
30* SS
WET SURFACES
304 SS
C.S.
C.S.
NO.
2
2
I
1
2
1
2
2
2
2
2
1
1
I
1
1
1
I
1
1
1
1
1

-------
00
in
US STREAM HO.
•AH. Ib/hr « 1000
•cto * 1000
PARTICIPATES. Ib/kr
SOj, Ib/hr
TEMPERATURE, *F
M|0. Ih/kr
0». *
Wk. 1k/kr
VUOCITV. fl/MC


LIQUID STREAM NO.
RATE. Ib/kr k 100
«P
TOTAL SOLIDS. 1
pH
TEMPERATURE. *F
HjO, Ib/hr
SULT1TE. »9/l
SULFATE, «g/l
CHLORIDE. BQ/J
SPECIFIC UAVITV
©
•9.3
33.0
IflJ^i
379
410
3900




®
100.4
22. S
l«-3
21
134
1500C
t.5

77.7

(J)
19.3
33.0
JjQiJ
379
410
3900




0 LIQUID STREAM NO.
100.4 MTE< lb/hr * "*
22. S «l"
14 j TOTAL SOLIDS. 1
21 PH
114 TEMPERATURE, "f
tsooo HzO. »b/lir
(.S SULFITE. "S/l
SULFATE. «g/l
77.7 CHLORIDE, ag/l
SPECIFIC GRAVITY
(|)

US
2
6.0
134

1500
99140

1.01
Cjp

us
2
6.0
134

1500
99840

1.01
(7)

230
2
C.O
134

1500
99140

__>OJ
(8)
5.17



70





(9)
1.43



70






®
• 0
It
IS
1.0

6*00



1.09
0
6t
13.2

7.5

6*00



1.00
^
24
3.4
SO
1.0

1200



1.31
t

560
912QC

1.00
&
633
125

12.0
7«

560
91200

1.00
®
633
12S

12.0
?Q

560
9120C

1.00
®
10
2.0

12.0
70
1000



1.00
S










O










^












-------
CO
a\










n »u-« _ Ml L1W SIMMt


auc
MS -
IK



<8











SL.
-i
—,&
K
fun 	
j

H






3







u
J£








M!-a—







i
F
lr
Ji

















<5)

-1
^s^





UATE


O
r
It
Lii


12
* 	 -j
R 43




J





MO
1
^

& rap UK sow sorruw




f*
	 VL 	 .
VI
V«
^if^ ®
!_® _
'3 » n
1^___J t__l_J

























£


to
¥
4M^
1
"* |r«i



gure 14-10. Caterpillar tractor Co




































^•cwi"™
DISMSM.
ja,_iaaL«
PS



. , Mossville.



lOUIPWHT LIST
EQNO.
F1
FR1

Pt


PZ

P4
PS
P6

RF1
SI
T1

TZ
Tl
T4
VI

NAME
F.O. FAN
FILTRATE
RECEIVER

RECIRCULATION
PUMP

BLEED-OFF
PUMP
CAUSTIC PUMP
FILTRATE PUMP
EXHAUST PUMP
UNDERFLOW PUMP

ROTARY FILTER
SEPARATOR
RECIRCULATION
TANK
LIME MIX TANK
THICKENER
SURGE TANK
VARIAILE THROAT
VENTURI
SUE, FEET





















MATERIAL





















NO.
1
1










1
4

4




4

       Steam flow characteristics for Boiler No. 2 are from a final report on particulate and
       SO2  emissions,  January 21, 1977.
MS STREW HO.
RATE. Ib/hr R 1000
•eta x 1000
^ARTICULATES, Ib/hr
SOj, Ib/hr
TEWERATURE, *F
NjO, Ib/hr
02, t
N0«. Ib/hr
TELOCITT, ft/tec

0)

40
604. i
440.1
413





©

21.4
10. 5
21.4
159





OP










® LIQUID STREAM MO.
RATE, Ib/hr x 100
gp«
TOTAL SOLIDS, f
pH
TEMPERATURE, *F
HjO, Ib/hr
SULFITE. 119/1
SULFATE, Hg/1
CHLORIDE, ng/1
SPECIFIC GRAVITY
(5)










$

14 S

6.48
130

24.2
86.9

1.1)1
(2)
2.9









(8)



K.4R
130

74.2
B6.9

1.131
c^










«*
.2









(^



8.3






^










^



8.4
120

13.7
70.8

1.108
<9




130





(^




130





<&










^










0










di
23.5

60*







$











-------
CO
                   ®p™*
          Figure 14-11.  Chanslor Western Oil  &  Dev.  Co.
                                                                            CQUIMENT LIST
CO NO.
Al
r\
PI
ft
n
P4
PS
P6
P7
PS
RF1
T1
TZ
TJ
T4
NAME
ABSORBER
F.O. FAN
RECIRCULATION PUMP
BLEED-OFF PUMP
MAKE-UP LIQUOR
PUMP
SODA ASH MAKE-UP
PUMP
LIME REACTOR PUMP
CLARIFIED EFFLUENT
PUMP
HAKE-UP HATER PUHP
HAKE-UP HATER PUHP
ROTARY FILTER
SODA ASH HAKE-UP
RECIRCULATION TANK
LIME REACTOR
THICKENER
SHE. FlfT















MATERIAL















M.
1
8








1
1
1
'
1
GAS STREAM NO.
RATE. Ib/hr « 1000
Kim i 1000
PARTICUUTES. Ib/hr
SO;, Ib/hr
TEMPERATURE, *F
HtO, Ib/hr
02. t
NOx. Ib/hr
VELOCITY, ft/JK

(Jj

113.4

491. S
sso





(£)



19.7






^










(4) LIQUID STREAM NO.
RATE. Ib/hr « 100
9P"
TOTAL SOLIDS. 1
PH
TEMPERATURE, 'F
HjO, Ib/hr
SULFITE, «9/l
SULFATE, ng/1
CHLORIDE, m)/\
SPECIFIC GRAVITY
CD










®










CD










^

71



















03










tp










^










0










(£











-------
H
00

00
              nut s«s 1*
                          IT n *m»n«M
                               rut
                                            to ATWSWWC       uHMisyo AM»ME*E
                                              S>
                                         H3"
                                                             PI
                                                            -£*-
                                                                  DISPOSAL I
                 Figure  14-12.   Chevron U.S.A.  Inc.
                                                                                               IQUIWMT LIST
EO NO.
Al
ri
PI '
PZ
P3
ST1
Tl
NAME
ABSORBER
F.D. FAN
RECIHCULATION
PUHP
HAKE -UP LIQUOR
PUMP
MAKE-UP WATER
PUHP
STACK
MAKE-UP TANK
SUE. FEET
16.S DIA.






MATERIAL
31 6L 55




3)6 SS

NO.
3
18
3


3
1
CAS STREAM NO.
HATE. Ib/hr x 1000
icf> i 1000
PAATICULATES, Ib/hr
SO}. Ib/hr
TEMPERATURE. *f
HjO. Ib/hr
oz, ••
NO,. Ib/hr
KEIOCITY, ft/**?

(|)

ISO

575.6
SOO





®



57.6






(|)










@ LIQUID STREAM NO.
RATE, Ib/hr x 100
9P»
TOTAL SOLIDS, S
B»
tlillRATURE.^F
HjO, Ib/hr
SULFITE, «9/I
SUIFATE, ag/l
CHLORIDE, ag/1
SPECIFIC CRAVITT
Cp

750

i. Ow
«.5






c&










CD










$










®










d^










9










®










QI










^










6










d^










6











-------
00
vo











.TO STAC*



W ri
M


1
P






CD
'J^
P—


. s>
a —
1



P

r^




SI
^T3







a?





WAT!



II

SSI

HE





II












i
-i



	


®
9

Tf.



Of UK

n
T2

I i
* ' -»
M
©
I 	 1 I
L'






?igure 14-13. Firestone Tire






















n
^£2







ft
1
1*
\
>—.,
\










£ mm
1 CAK



and Rubber Co.






EQUIPMENT LIST
EQ NO.
Fl
LSI

PI

P2
RF1
SI
SSI
Tl
T2
T3
T4
VI

NAME
F.D. FAN
LIME STORAGE
TANK
RECIRCULATION
PUHP
LIME REACTOR
PUMP
ROTARY FILTER
SEPARATOR
SODA ASH
STORAGE
RECIRCULATION
TANK
LIME REACTOR
THICKENER
SURGE TANK
DUAL THROAT
VENTURI
SIZE, FEET






4.67 OIA x 7.17 HIGH






.5-1.25 THROAT LENGTH
MATERIAL



RUBBER-LINED
f*e*r fcnu
I*n3 1 I nun
CAST IRON
3)6L S.S.
3161 S.S.

316L S.S.
C.S.
C.S.
C.S.

3141 S.S.
NO.
1

1
1


1
1
1
J
1
1
1

1

GAS STREAM NO.
RATE. Ib/hr x 1000
tclm * 1000
PARTICULATES. Ib/hr
SOj. Ib/hr
TEMPERATURE, "F
H?0, Ib/hr
02. i
H0». Ib/hr
mOCm. ft/stc

0P

1)
4SO
360
300





(|)

10
11. 7
14.2
130





(1)










0 LIQUID STREAM NO.
RATE, Ib/hr > 100
9P»
TOTAL SOLIDS, t
pH
TEHPLRATURE, "f
HjO, Ib/hr
SULFITE. «9/l
SULFATE, Bg/I
CHlOBIDf, B9/I
SPECIFIC GRAVITY
CD










C










^










^





















(9










o
l.B

55







ft










^











-------
                     n STAC it
Maim Munn>Ta
        
  run
      ua.
Q
£
!_,


t

Ellkkki
X~><
NT^
xr~>J
IAt
_•]
amsm HUN Mm
, ®
»r»
~ ".' *
:.^i
.114

* <'
& ***,,.
-f
riii


& 	 i
erw n
{
\
" f
•4
a>

K
«_-^
f
&
TO nun pj"

-------
                                        TOST**
VO
  Figure 14-1§.   General  Motors Corporation,  Dayton.
                                                                                  EQUIPMENT LIST
CO NO.
Al
n
PI
n
n
T1
T2
T3
NAME
ABSORBER
P.O. FAN
RECIRCUIATION
PUMP
CAUSTIC PUMP
BLEED-OFF
PUMP
RECIRCULATION
TANK
CAUSTIC TANK
BLEED-OFF
TANK
SIZE, FEET
6 D1A. x 10 HIGH
35,000 SCFH,
9 IN. U.G.
200 6PM. 25 HEAD
BO 6PM
SO 6PH
7.5 DIA. i 12 HIGH
9 OIA. x 18 HIGH
6 DIA. 1 t.S HIGH
MATERIAL
31 6L SS
C.S.
RUBBER-LINED C.S.
C.S.
RUBBER-LINED C.S.
3161 SS
C.S.
31 M. SS
NO.
2
2
3
1
2
1
1
J
GAS STRUM NO.
RA1C, Ib/hr > 1000
tdm * 1000
PARTICULATCS, Ib/hr
SO?. Ib/hr
TEMPERATURE, •{
H20, Ib/hr
02. »
NO,, Ib/hr
VELOCITY, ft/SIC

(i)

45
55.3
lll.S
400

















-------
to Figure  14-16.  General Motors Corporation,  Parma.
                                                                               tquimiNt LIST
EQ NO.
A1
F1
i
HI
"
Pt
PI
N
PS
Rfl
111
«1
Tl
Tf
Tl
T4
Tl
Tl
NAME
ABSORBER
F.D. FAN
RIHEATER
REC{RCULATION
PUMP
PUMP
UNDERFLOH PUMP
UNDERFLOW PUMP
' FILTRATE PUMP
ROTARY VACUUM
FILTER
LIME STORAGE
SODA ASH
STORAGE
CHEMICAL MIX
TANK
CHEMICAL NIX
TANK
CLARIFIES 11
CLARintR It
FILTRATE TMK
•tCIKCULAtlM
TANK
SUE, FEET
10.S OIA. « ZZ.S HIGH
200 HP. 1? IN. W.G.
?-7M GPM
?-550 GPM
700 GPM
100 6PM
K 6PM
100 GPM
SOO SQ. FT. AREA
90 TON
IS TON
SOOO GAL
5000 GAL
60 DIA. • 14 HIGH
60 DIA. i 14 HIGH
4 MA. » 7 H1W
f-HNML
t-MOOML
MATERIAL
3161 SS
C.S.
C.S..
RIMER-LINED
I
RUBIER-LINED
RMBER-LINEO
RUBBER-LINED
RUBIER-LINED
C.S.. POLYPROPYLENE
CLOTH
C.S.
C.S.
C.S.
C.S.


C.S.
C.I.. TAt
COATING
NO.
4
4
4
4
1
I
I
t '
t
t
,
1
t
1
1
1
4
GAS STREAM NO.
RATE. Ih/iir « 1000
«cta « 1000
PARTICULATES. Ib/hr
SO?. 1fc/hr
TEMPERATURE. *F
HjO, Ib/hr
02, 1
"0», l*/hr
VELOCITY, ft/sec

(ft

Sl.i
71.2
1*7
sso





(i)

1S.S
60.8
41. S
152





(3)










© LIQUID STREAK M.
RATE. U/hr « 100
«P"
TOTAL SOLIDS, I
PH
TEMPERATURE. 'F
H|0. Ib/hr .
SULFITE. Bg/1
SULFAIE. ai/1
CHLORIDE. Bf/1
SPECIFIC GRAVITr
dp)










c«)










Cjp










(•)










$










^










^










0

1200








ft










ft


15-21







4










4










4










19










0










&


so







(?) '











-------
VO
u>
   Figure  14-17.   General Motors Corporation,  Pontiac,
                                                                           nnrmm HIT
tO NO.
A)
Ft
PI
ft
PS
M
PS
P6
T1
Tf •
MME
ABSORBER
1.0. FAN
RECIRCULATIM
PUMP
WOERFLCM
POMP
RECIRCULATION
PUMP
RECIRCULATION
PUMP
MAKE-UP PIMP
MAKE-UP PUMP
MHOIM TAJ*
CLARIFim
SIZE. FEET
12 OIA. i 21. S HIGH









WTERIAl
3161 SS









M.
I
I








MS STREAM MO.
RATf . It/hr » 1000
•cte« 1000
PARTIOMTCS. 16/hr
SOj, U/hr
1CMKRATURE, *F
MjO, Ik/Or
02, *
NO,. Ift/hr
ULOCITV. ft/iK

^

91
85.5

360





(*)

75
2B.2

360





(3)










© LIQUID STMAM M.
RATE. Ib/hr « 100
4P"
TOTAL SOLIDS. I
PH
TEMPERATURE, *F
HjO, Ib/hr
SULFITE. «9/l
SULFATE. «9/l
OaORIOE. •»/!
SPECIFIC 6AAVITY
(|)










$










(J)










qp










^

10-20
S.O







4

4 OS








4>

32S








4

so








4

so








4










4










4










9











-------
VO
                            to mwimm   tempt to «nmnni   "5*8.« *n»swnt    HHMISJJO «nasnc«
                                   J?         J?           f
                                 JL       A         A_
          Figure  14-18.   General  Motors Corporation, Tonowanda
                                                                                            LIST
CO NO.
n
PI

n
n

P4

PS

P«

P7
SI
STI
Tl
TZ
T3

T4
ts
t«

VI

HAHt
i.o. FAN
REC1RCVLATION
PUMPS
OVERFLOW PUMP
CHEMICAL FttD
PUMPS
SCRUMER M.OM-
DOUN PUMPS
HASTE TREATMENT
TRANSFER PUMPS
CAUSTIC FEED
PUMPS
MAKE-UP PUNP
SEPARATOR
STACK
RECYCLE TANK
OVERFLW TANK
OCNICAL FEED
TANK
AERATION MIHR
MOLDING TANK
CAUSTIC STORAGE
TANK
VARUVU TMOKT
VERTURI
S1ZC, FEET

























WTERIAl













1161 SS
S.S.









im n
NO.
4

t
1

1

I

2

1
1
4
4
4
1

1
1
1

1

«
8AS STREAM «.
•AH, Ik/kr « 1000
•Cffel 1000
PMTICOUTES. 11/kr
•ft. IMir
fBVOMTUK. *F
MfO. lk/hr
ft. »
NO,. lW*r .
mocm, ft/Mt

(J)

3».«
130.0
2S7.3
3SO





(J)

3C.O
104.0
210.1
4 OS





®


11.0
25.7




»

<$) nquio SIMM n.
RATE, Ib/hr • 100
P*
to. 4 TOTAL SOLIDS, t
21. t |M
TEMPCMTURE. *F
HlO. Ik/hr
SULFin. •!/!
SW.FATE. B9/1
CHLORIDE. «|/1
SPECIFIC CRAY ITT
(S)



6.0






(jp



fi.O






^



7.0






t|)

792

7.0






<$

720

7.0






<$










y










^


'1.0







^


<1.0







^


<1.0







^

25-101








$










6











-------
                                       10 STACK
V0

Ul
                                           NWE-W tutcx mm
                                             PU.P mn nuctu
                                            n cm sows
          Figure  14-19.   Georgia-Pacific  Paper Co,
                                                                                       iquincm LIST
EO NO.
ri
PI
SI
Tl
»1
NAME
F.D. FAN
RECIRCULATION
PIMP
SEPARATOR
RECIRCULATION
TMK
VENTUR1
SIZE. FEET

5000 6PM
24 * SS HIGH

I.S HIM i 10 MISH
MAURIAL

304SS (WB8ER-LIHEO
304SS. FIBER6U5S
LINED
JMSS
30455
NO.
1
1
1
1
1
SAS STREAM NO.
RATE. lb/hr i 1000
•eta • 1000
MRTICUUTES. IWhr
S0». Ik/hr
TOVCMTURE. *F
NjO, Ik/hr
01. t
Mh. lk/kr
HLOCITT. ft/we

Q)

320
765
1094
110





@


SO
164






OP










© Liquid STREAM NO.
RATE, Ib/hr « 100
«•
TOTAL SOLIDS. I
P«
TEMPERAIUtE. *F
HjO, Ib/hr
SULflTE. ag/1
SW.FATI. kg/I
CHLORIDE. -9/1
SPECIFIC GRAVITY
®










$

sooo








C^J

2100








(|i)

2000

7.5






^










40










V










®










^










^










^










K^










«^











-------
VO
OS
                       OH
                       MS
                       II
                           CD
                                      or

                                      ©
                                            ssa
             Figure 14-20.   Getty Oil Company.
EQUIPMENT LIST
FQ NO.
Al
F1
PI
Tl
T2
NAME
AI&ORBER
F.D. FAN
RECIRCULATION
PUMP
DISPOSAL TANK
SODA ASH
HI I TANK
SUE, FEET
13.5 OIA. > 35 HIGH



42.000 GAL
MATERIAL
31 U SS



l/«" C.S.
NO.
1
1
1
1
1
6AS STREAM NO.
RATE. Ib/hr x 1000
•eta • 1000
PAKTICUUTES. Ib/hr
M». Ih/hr
1BPIM1WE. *T
HlO. Ib/hr
02. *
NOi. Ib/Hr
KIOCITT, ft/MC

(I1)

110


500





0)

I2.fi


150

t



dp










® LIQUID STREAK NO.
RATE. Ib/hr x 100
»•
TOTAL SOLIDS. S
PH
TEMPERATURE. *F
H;0. Ib/hr
SULFITE. ng/1
SULFATE. •?/!
CHLORIDE, •»/)
SPECIFIC GRAVITT
(p

to








$

1000

e.i






(?)










(•)










OP










ty










fy










fy










0










^











-------
vo
-J
                                            BISMML
              Figure 14-21.  Getty Oil Company.
                                                                                  tquiPMEKT LIST
{QUO.
At
F1
PI
n
n
T2
MNE
ABSORBER
r.D. FAN
RKIRCUUTION
PUMP
BLEED-OFF PUMP
DISPOSAL TANK
SODA ASH
Nil TANK
SIZE. FEET
18 DIA. X 33 HIGH
500 HP, 11 IN. US
40 HP. 1000 6PM
40 HP, T-2 SHt

20 OIA. X 20 HIGH
41.000 tAL.
MATERIAL
31. Ib/hr
mocnr. rt/itc

(T)

zoo


too





d)

127


ISO





CD










© LIQUID STREAM NO.
RATE. Ib/hr i 100
«•
TOTAL SOLIDS. S
»H
TEMPERATURE, *F
H}0. Ib/hr
SULFITE. -J/1
SULFATE. -9/1
CHLORIDE. «j/l
SPECIFIC GRAVITY

-------
00
                                            Q ,n,i
             Figure 14-22.   Great Southern Paper  Co,
                                                                                 fQUIPNENT ilST
CQ NO.
PI
ft
SI
n
TZ
VI
IMNC
REClRCttATtflM
PUMP
ASH PIMP
SEPARATOR
KCIRCUUTIOM
TANK
MOID TANK
VtNTUII
SIZE, FttT
?<00 9P"
*»9«»




MATERIAL
RUMER-
IINEO
RUUER-
UNfO
ss
ss

ss
NO.
3
?
I
\
\
Z
CAS STREAN NO.
RATE. It/kr • 1000
tcf* « 1000
PARTICULARS. Ife/hr
SOf. m/hr
TENPUATURf . *f
H|0. Ib/hr
Oz. t
NO,. Ifc/fcr
VELOCITt. (1/tK

(1)

ISO
tioo
2SOO
4IS





Of)

211
•S
ISO
110





0)










(?) LIQUID STREJM NO.
RATE. Ib/hr * IUO
«•
TOTAL SOLIDS. 1
P«
TEMPERATURE. *F
HjO. Ib/hr
SW.FITE. ^/l
SW.FATE. mt/\
CHLORIDE. •!/!
SPECIFIC GRAVITY
(J)










$

"8iO








Q>










CO

1200
I-?







(•)

I COO
1-^i







^

1COO
J-S







^

coo
t-l







0










^










^










4










^










Q>











-------
vo
         Figure 14-23.  Great Western Sugar, Billings,
                                                                                   LIST
EQM.
Fl
NEt
PI
n
M
sn
T1
VI
NANE
F.O. FAH
HIST ELIMINATOR
RECIRCULATUM
MAKE-UP w»
HASTEHATEt W»
STACK
RECIRCUUmOR
TANK
VARIABLE THROAT
vfMTMi
SIIE, FEET








MATERIAL








NO.
1
1



1
1
'
MS STKJHM.
•MI. Ib/Kr • 1000
•Cta i 1000
MMTIOIUnS. Ih/ftr
SOf. IWfcr
TOKMTVK. «r
N|0. Ih/hr
Of. B
•0,. Ik/kr
mocm. rt/ttc

d?










4










gf)










® iimn sfiRM w.
MTt, lb/hr * 1*00
fP"
TOTM. SOLIDS. S
l«
TortMTuw, OF
HfO. Ib/hr
SUUUTE. «|/l
SW.FMTE. *nn
CHLORIDE, ••/!
SPECIFIC CMVITT
(D










$










^










(S)










^










1*










^










9










^










^










$










OP











-------
            IM
                                               TO NUMB
                                           n
o
o
      Figure 14-24.  Great Western  Sugar, Findley.
                                                                             couimiin LIST
!Q NO.
n
MIt
PI
n
n
ST1
T1
VI
KAMI
F.O. FAN
HIST ELIMINATOR
RtCIRCULATION
PUMP
MAKE -UP PUMP
MASTEHATC* PUMP
STACK
KICUCUIATION
TANK
VMIMlt TMMMT
VfNTimt
SUE. FEET





7.S D1A


MATERIAL

SHUL-316L SS





im n
M>.
t
1



1

1
GAS STIUM NO.
MTE, Ib/hr i lUOtf
Htm i 1000
PARTItULATES. lu/hr
SO?. Ib/hr
TEHPEMIUU. *F
N20. Ib/hr
03, .
kOk, lo/hr
»HOCIT», ft/itc

CO

I2Q

261.)
SIS





®



61.1






 1UO
9P"
TOTAL SOLIDS, %
P"
TEMPERATURE. *'f
H;0. Ib/hr
suirin, ng/i
SULFATE. ng/l •
CHLORIOC. «9/l
SPECIFIC GMVITf
ty










(6)

soo








(?)

300








($

300








($

r!20








<$










fy










&










®>










(ft










$










$










6











-------
10
o
                                       EBttlST
                                    I  •" TO
                                    gj ATNosranc
                                                    TO mum
        Figure  14-25.   Great Western Sugar, Fort Morgan.
                                                                                          E9UIPMOIT LIST
EQ NO.
F1
Mil
PI
P2
P3
ST1
Tl
VI
KAMI
F.D. FAN
MIST ELIMINATOR
RECIRCULATION
HASTEHATER PUMP
MAKE-UP PUMP
STACK
RECIRCULATION
TANK
VARIABLE THROAT
VENTURI
SIH. FEET





9.5 DIA. x 60 HIGH


MATERIAL

SHELL -304L SS





316L SS
NO.
2
1





t
6AS STREAM NO.
RATE. Ib/hr > 1000
•eta i 1000
PART1CULATES. Ib/hr
SO}. Ib/hr
TEMPERATURE. *F
NjO. Ib/hr
0?. J
N0|. Ib/hr
VELOCITY, ft/we

®

100
728
26fi
400





(5)

6S.1
34.7
267
100





(5)










0 LIOUID STROM NO.
RATE, Ib/hr « 100
9P>
TOTAL SOLIDS. I
PH
TEMPERATURE, 'f
HjO. Ib/hr
SULFITE. •)/!
SULFATE. «9/l
CHLORIDE. If/I
SPECIFIC CRAVm
(s)

1600*








(¥1

800








(b

icoo








(D

1600








tt)

120









-------
N>
O
10
                                  IDWUSt
                                   TO

n
fin
	 i








1 	
rt
|

(!)
I 	 q


(T)

V
I


i 	

AA
W '



<*)


$tl
A/
w
Kl


1
tl


NA
V







(Tl
(3) oonm
*™

®
_T1 wa-w
n
M "*
       Figure  14-26.  Great Western Sugar,  Freemont,
                                                                                 LIST
10 NO.
Ft
«1
PI
M
PS
STl
Tl
VI
NANf
F.D. rut
HIST ELIMINATOR
RECIRCULATION
PUMP
MAKE-UP PUMP
MASTEMATER PUMP
STACK
RECIRCUIAT10N
TANK
VAHIAM.E THROAT
VENTURI
SUE. FEET








HATCRIAL








NO,
?
J



1
1
1
MS STtCANM.
•ATE. Jfc/fcr • 1000
•Cta • 1000
MUTICIIUTES. Ih/kr
SOj. U/hr
TEMKtA.VRf. *r
N}0. Ib/hr
02. »
•OB, Ib/kr
niOCITY. ft/MC

(I)










^










())










© LIQUIt S1RIAN HO.
RATE, Ik/kr • 100
•»•
TOTAL SOLIDS. I
PH
TEMTERATWE, 'f
MjO. Ib/hr
SULFITE. ••/!
SULFATE. «i/1
CM.ORIK. «|/I
SPECIFIC CRAVITT
^










$










QJ










$










$










V










V










<$










0










^










d>










4










4











-------
to
O
U)
                                               n MUM
        Figure  14-27.  Great Western Sugar, Gering,
                                                                                  EQUIMEHT LIST
EQ NO.
n
ME1
PI
n
P3
STl
Tl
VI
MM
F.D. FAH
HIST ELIMINATOR
RECIRCUIAT10N
PUMP
MAKE-UP PUMP
HASTEUATER PUMP
STACK
RECIRCULATION
TANK
VMIAM.E THROAT
VENTURI
SIZE. rEET





9 OIA.


MATERIAL

SHELL 3041 SS





J04L SS
NO.
2
\



^
\
t
CM STREAM M.
•ATE. Ib/hr • 1000 •
•eta i 1000
PMTICUUTES. Ib/hr
SO;. It/hr
TEMPERATURE, *f
HfO, Ib/hr
01. »
NO*. Ib/hr
VaOCITIT. ft/stc

(t)

97

336.6
450





(?)



101. 0






(i)










0 LIQUID STREAM HO.
MTE. Ib/hr « 100
DP"
TOTAL SOLIDS, t
PH
TEMPERATURE. *f
H|0. Ib/hr
' SULFITE. m/|
SULFATE. ng/t
CHLORIDE. ag/I
SPECIFIC CHAVITT
(?)










(p

600








(J)

1400








$










$

ISO








Q>










4










^










^











-------
        £	®_
                            IBWIIT
                              TO
                         5T1
                                  •{ML
A
1 1

|Q 	

(?) 1 __
Tl
_f^v WHI^fl*
M
® g_
n
                                         TO«IOI*
Figure 14-28.   Great Western Sugar, Greeley.
                                                                            LIST
10 NO.
M
Wl
PI
n
P3
ST!
Tl
¥1
NAMf
r.o. FAN
NUT ELIMINATOR
RECIRCULATION
PUHP
NAKE-UP PIWP
MASTEMATER PUMP
STACK
RECIRCULATION
TANK
VMIAIIC TMKMT
VCNTUK1
SUC, FECT


-t




MATERIAL

316 SS
• •



J1U SS
NO.
6
1


1
1
1
MS STUEAN NO.
Mil. Ib/hr « 1000
•eta « 1000
rWIICULATtS. Ib/hr
SO?, U/hr
TEWEMTUIE, *F
HjO. Ib/hr
02, »
NOt, Ib/hr
mOCITY. ft/ltc

CO

164.6

141.1
450





C')



221. 0






OP










(4) LIQUID STKEAN M.
HATE. )b/hr • 100
9P"
TOTAL SOLIDS, S
l«
IEHPEMTWE. *F
HjO, Ib/hr
SULFITC, ng/I
SULFATE, «9/l
CHLORIDE. •»/!
SPECIFIC GHAVITT
Cp

550»








$

1100








(p

sso








OP

1100








($

120








(^










V










®










^










^










O










ft










4











-------
to
o
Ul
     Figure 14-29.  Great Western  Sugar, Loveland.
                                                                                EQUIP*IT LIST
EQ NO.
Fl
MCI
PI
n
n
ST1
Tl
VI
NAME
F.D. FAN
HIST ELIMINATOR
RECIRCULATION
PUMP
MAKE-UP PUMP
HASTEHATER PUMP
STACK
RECtRCULATION
TANK
VARIABLE THROAT
VENTURi
SHE, FEET





65 HIGH > 10.2 DiA.


MATERIAL

3161 SS





316L SS
».
?
1



1
1
i
CAS STREAM HO.
RATE. )b/hr « 1000
Kim i 1000
MftTICULATES, 10/lir
SO?. Ib/hr
TENPERA1URE, *F
HjO, Ib/hr
02. 1
MO,. Ib/hr
VELOCITY, ft/tic

(p

100

lf.0.1
410





®

66.*

227.1
122





(p










(T) LIQUID STREAM NO.
RATE. Ib/hr x 100
gpn
TOTAL SOLIDS. 1
PH
TEMPERATURE, *F
H20, Ib/hr
SULFITE, ag/l
SULFATE. ng/t
CHLORIDE, mtt\
SPECIFIC 6MVITT
(D

1500t








(?)

800

8.7






(p

750








^

1SOO








(«)

120








<$










^










(^










0










(^










03










O










(^











-------
to
o
                                                          fOHOlOIIC
<^    Figure 14-30.   Great Western Sugar, Scotts Bluff,
                                                                                            EQUIPMENT LIS1
EO NO.
n
ME1
.".
n
n
ST1
T1
VI
NAME
r.D, FAN
HIST ELIMINATOR
MCIRCULATION
PUMP
MAKE-UP PUHP
IIASTEHATER PUMP
STACK
RECIRCUIATION
TANK
VAUIABLE TMTOAT
VCNTURI
SI2C, rEET





10. S OIA.


NATEP.1AI

SHELL -3041 SS





XML SS
NO.
?
1



1
1
»
                MSSTKMM.
                            (    itgnt mm ».
()
JL
                MTC.
                                               MTf • 1k/hr » 00
                  i I
                                                                           use
                                                                               190
               PMTIOUm,
                             ui. a
                  1M.I
                              4M
                                  121
               Of. I
•%. WOL
                                                  A1E,
fOKHT. ft/MC
                                               OUMH.fll/l
                                               vcciFic •wvin

-------
M
O
                                       MSTDMTC* nuncin
          Figure 14-31.   ITT Rayonier, Inc.
                                                        TO sraci
                                                                                        EQUIPMENT LIST
EQNO.
n
PI
SI
T1
VI
NAME
F.D. FAN
RECIRCULATION
PUMP
SEPARATOR
RECIRCULATIQN
TANK
VARIAILE THROAT
VENTURI
SUE. FEET
1035 HP
75 HP
16.5 OIA. x 38 HIGH


MATERIAL

316 SS
3161 SS

31 ft SS
NO.
Z
1
}
1
2
6AS STREAM NO.
RATE. Ib/hr i 1000
•CfB « 1000
PARTICUUTCS. Ik/hr
%0t. Ik/lir
TOrCRATURt, of
HjO, Ik/kr
OZ, 1
Mk, Ib/Nr
VELOCITY. ft/MC

^

its
1300
1132.1
4CO





@

140
1300
9C1.0
460





®


10
u».»






(|) LIQUID STREAM NO.
RATE. Ib/hr • 100
»P»
30 TOTAL SOLIDS, t
144.2 PH
TBVERATURE.^F
HfO. Ib/tir
SULFIIE, q/l
SU.FATE, •)/!
CHLORIDE. •!/)
SPECIFIC 6RAXIT»
(5)

110








<8>

1470








•'(|b

ISO








ci)

1620








(*)










^










^










^










6










ft










ft










4p










V











-------
                     ..... _  I*
                 vwvws
                       
O
00
Figure  14-32.  Kerr-McGee Chemical Corp.
                                                                              touinvm list
EQ NO.
A1
Fl
HI
PI
NAME
ABSORBER
F.O. FAN
REHEATER
NECIRCULATION
PIMP
SIZE. FEET
30 OIA. i 3S HIGH

SO'F REHEAT
US ftPN
MATERIAL
C.S., F1BER6LASS
LINED. 3161 SS
TRAYS
C.S.
C.S.
C.S.. RMKR-LINEO
NO.
J
t
t
t
MS STKMm.
MU, Ih/kr » 1000 •
•cm « 1000
pMniauns, iwnr
M|. IMw
TOKMTME, *f
mo, iwi*
•I.*
Mil, IVhr .
matin, ft/m

(J)

J6J


320





(|)

29«


ITS





^










0 LIQUID STREAM NO.
RATE. Ib/hr i 100
9»»
TOTAL SOI IDS. S
*
TOVCMTWC. 'F
H}0. Ib/hr
SULFITE. »|/1
SMMTE. «|/1
CMORIDC, B|/1
SPECIFIC 6M«m
cp










d)










(?)



( . 0-
6.5






Q

125

6.5






l|)



w • w™
6.5






^










<9>










1?










"i*










<^










^










&










fo











-------
10
o
VO
                                     TO HLt ma
Figure 14-33.   Mead Paperboard Co,
                                                                                    EQUIMBir HIT
IQ. M.
A1
Ft
n
n
Tl
n
NMC
ABSORBER
f.O. FA*
REClRCUUmON
WH»
OUISTIC PUMP
RECIRCULATIM
TANK
SODIUM CAMOHATt
TANK
SIH. FEtT






MTCRIM.
311 SS



FIBER6USS

MO.
1
1
1
1
1
1
MS STREW «.
RATE. Ib/hr « 1000
•cfb • 1000
MftTICWATES. Ik/lMP
S0». Ik/hr
TOKMTUK. *F
H|0. Ib/hr
02. S
"Bb. W*r
mociTt, rt/ttc

0?

175


4SO





(P

IIS


140





qj










(J) LIQUID STREAM NO.
RATE, Ib/hr x 100
9P"
TOTAL SOUOS, 1
(*
TO»IRATyRE,










(^










@










0










3










©










<$










(6>











-------
                                10 met
M
I-1
O
                                          »>WOHU.l«Dt«
                                          MOCISS *»t:i
           Figure 14-34.   Minn-Dak Farmer's Coop,
                                                                                      EQUIPMENT LIST
IQNO.
n
NCI
PI
Tl
VI
NAHt
F.O. FAN
MIST
ELIMINATOR
RECIRCUIATION
PUMP
KCIRCUIATION
TANK
VARIABLE THROAT
VINTURI
SUE, fttl


7S HP 3000 6PM
10 i 10 > 10

MATERIAL

31 655

CONCRETE PIT,
TAR LINED
J1H SS
NO.
t
2
t
t
i
MS STREAK NO.
HATE. Ih/hr * 1000
icta « 1000
PMTICUUTES, 1b/Nr
SOfe. Ib/hr
TENPERATURE, t
HfO. Ib/hr
02. »
N0». lk/hr
mOCITT. ft/MK

CO

1»
245.1
"iti
ISO





C?)



10-17

40.0




Q>










0 LIQOIO STREAM NO.
RATE, Ib/hr . 100
9P» '
TOTAL SOLIDS, t
PH
TEMPERATURE, *F
HjO, Ib/hr
SOLFITE. *g/1
SULFATE, «9/l
CHLORIOC, B|/1
SPECIFIC GRAVITY
(5)

tooo«

S.4






Q

2000

S.4






(})










($

486

5.0






®

250








ty>

soo

S.Q






0^





















o










(!)










^










(^










ft











-------
                                        ALML1S Oil flftO UUTWHTOI
                                  BMM
Figure 14-35.  Mobil   Oil Company,  Buttonwillow,
                                                                             EQUIPMENT LIST
EQ NO.
A1
M
M
HAW
ABSORBER
RECIRCULATIW
PUMP
MAKE-UP PUMP
SIZE, FEET



MATERIAL
C.S., EPOXT COATED


NO.
7
7
7
8AS STREAM MO.
RATE, Ib/hr > 1000
•cfn i 1000
PA«TICUUTES. Ib/hr
SOj, tk/kr
TEMPOATURE, f
HlO, tk/kr
0|, I
»0k. IWNr
niociTT. rvtic

(P

11.4

10
Stt





(|3



4.5






OP










0 LIQUID STREAM NO.
RATE, Ib/hr > 100
9P»
TOTAL SOLIDS. I
pH
TEMPERATURE, *r
HjO, Ib/hr
SULriTE, Kg/I
SULFATE. •»/!
CHLORIDE . •»/!
SPECIFIC 6RAVITT
(|)










(?)










(7)





)
t




(|)

15








l|)










1^










d)










j|i










^










•9










6>










<$











-------
to
I-1
to
*VH MS ItSLm
14-36. Mobil
^MUi— -
~~
	

M
Oil
* (D ^MMAHMMMLni
_ LuTTwSk DIVOSM. KM
•^iH
Corp . f San Ardo .
EQUIPMENT LI 11 Ifllfll 1
EO NO.
AI
F1
n
STI
NAW
ABSORBERS
1.0. FANS
RECIRCULATION
PUMPS
MAKE-UP PUMPS
STACKS
Slit. FEIT
4 OIA. > 20 HIGH
MATERIAL
SHELL AND TRAYS
316L SS
C.S.. 3161 SS LININGS
ON CASINGS
FIBtmAJS
EQUIPMENT LIST SYSTEM I
10 NO.
At
Ft
PI
n
STI
NAME
ABSORBERS
I.D. FANS
RECIRCULATION
PUMPS
MAKE-UP PUMPS
STACKS
SIZE, FEET
6.S OIA. k K H16H
MATERIAL
SHELL AND TRAYS
3161 SS
C.S., 316L SS LININGS
ON CASINGS
FIBEMLASS
NO.
70
10
to
N

M).
B
B
B
B

CAS SIKANNO.
HATE. Ib/hr s 1000
•eta * 1000
PMTICmATES, Ib/hr
SOf. Ik/hr
TENPEMTURC, *F
H?0, Ib/hr
Ot. I
NO., tk/hr
mOCITT. ft/SK

0?

1

<•
410





tip



C.I






Q)










© LIQUID STREAM NO.
RATE, Ib/hr * 100
9P"
TOTAL SOL IDS. t
P«
TEMPERATURE, "f
HfO, Ib/hr
SULFITE. •}/!
SULFATE, ag/l
CHLORIDE. BQ/I
SPECIFIC GRAY ITT
^

75








$



«i9






^



«-9






OP



*.o






$



i.O






y










^










^




11





1^




fft




ft




0^




«M FLO* CMMCTIRISTIU
FOR STSTW 1
















^










CAS STREAM NO.
RATE. Ib/hr • 1000
•eta « 1000
PARTICUUTES. Ib/hr
SO}. Ib/hr
TEMPERATURE. *F
H;0. Ib/hr
OZ. 1
NO.. Ib/hr
VELOCITY. Ft/sec

0)

11

15J
470









1S.1






(1)










Cj) LIQUID STREAM NO.
RATE, Ib/hr x 100
9P»
TOTAL SOLIDS, S
PH
TEMPERATURE. *F
H;0, Ib/hr
SULFITE. «g/l
SULFATE, «9/l
CHLORIDE, ag/l
SPECIFIC GRAVITY
Cp

200








$



6.0






(p



6.0






$



6.0






OP



1.0






4r*










4}










$




V





^




rwMPi
n




^




LMCHM
WSTST1




9




Mcrai
EMI




®




mcs





4











-------
                                     KISTMI
(O
I-1
OJ
               Figure 14-37.   Nekoosa Papers,  Inc.
                                                                                  EOUIPNCNT LIST
EQ NO.
ri
•i
n
P3
SI
Tl
T2
VI
NMC
F.D. FAN
RECIRCULATION
PUMP
8LEID-OFF PUMP
MICE -UP PUMP
SEPARATOR
RECIRCULATION
TANK
HAKE -UP TANK
VARIABLE THROAT
VENTURI
SHE, FEET








MATERIAL








NO.
i



2


?
CM STROM NO.
RATE. Ib/hr > 1000
•eta! 1000
MATIOJUTES. lk/hr
M|. lk/kr
TENPCMTUK. f
NlO. lk/kr
«H. I
"0,. lk/kr
mOCITT. fl/MC

0)

MS
2112
12*»
1SS





$


27
12<






^










(J) LIQUID STtEM NO.
RATE, lk/kr i 100
W*
TOTAL SOLIDS. S
*
TCNHRATUM. «F
MjO. lk/kr
SULTITE. "I/I
SULFATE. B|/l
CM.ORIOE. •!/!
SPECIFIC tHAVin
(D
2.S
SO

>«5"
c.o






(t)










$

l50Jt(








(i)










(1)
7.Z
<°°








^










(^










4










^





















^










4










(^)


*








-------
                      * 1000
PARTICULARS, lb/hr
SOj. lb/hr
HHPIRATURf . *r
H20. lb/hr
02. »
"On. lb/hr
VELOCITY. ft/MC

(J)

IS


ISO



10

IUO 9P" TOTAL SOLIDS. I PH TENPERATURE. *f HfO, lb/hr SULHTE, *g/1 SULFATE. B|/l CHLORIDE. Mg/l SPECIFIC GRAVITY ty 1000 t.S 110 $ 7.5 ty $ $ (^ i-11 «.s ^ ^ « 0 ft ft lit 6


-------
to
M
l/l
             Figure  14-39.  Rickenbacker Air Force  Base
                                                                                touincuT LIST
tQ NO.
A1
ri
LSI
NCI
PI
P2
P3
ST1
Tl
T2
. TJ
T4
NAME
ABSORBER
F.D. FAN
LINE STORAGE
MECHANICAL
COLLECTOR
RECIRCULATION
PUMP
RECIRCULATION
UNDERFLOW PUMP
STACK
LIME MIX TANK
2ND STAGE LEVEL
TANK
1ST STA6E LEVEL
TANK
CUKIFIER
SHE, FEET
12 DIA. i 61 HIGH
600 HP
12 OIA. * 60 HIGH
(120 TONS)




5.5 OIA. « 20 NIGH



n OIA.
MATERIAL
3161 SS

3/16"
A-Jt STEEL

RUMER-IIKO
RIMER-LINED
RUME1I-LINED
FRP
3161 SS


MOO
NO.
1
1
1
1
1
1
1
1
1
1
1
1
(AS STRUM NO.
DATE. lk/»r • IUOO
tcf* • 1000
PAIflCULAHS. Ib/hr
SO?, 16/hr
IEWEMIME, 'F
NiO, Ik/hr
02. *
NO*. Ib/hr
(CLOCIIT, ft/m

tt)

101
5T7.S
tlt.l
47S





®


11.6
64.0






Q)










(§) LIQUID STREAM NO.
RATE, Ib/hr > 100
W
TOTAL SOLIDS, I
PH
TEWERATME, *F
MjO, Ib/hr
SULFITE, -9/1
SULFATE. ag/1
CHLORIDE. •!/!
SPECIFIC GRAVITr
9










$










(^










$


12.0
i-6:o






^










V










^



4.B






V


<40







^










^



5.5






4










d>










^










Oj)



I.S






&











-------
                              -TO SIM
10
                 Figure 14-40.   Sheller Globe Corp.
                                                                                     IIST
IQNO.
»1
rt
PI
n
Tl
tl
It
MK
MSOftKR
I.D. r«N
RECIRCUIATION
WP
iitED-off w
MCIRCULAT10N
TANK
CLMlFltR
MMINT MH-UP
TMK
sizt, rcn




20 « 10 I 8 HIGH


MATERIAL
S.S.

•RWH

C.S.


•0.
1
1


1

1
CAS S1U/M W.
MTC. IWhr a ION
•cte* 1000
fMIIClMHS. Ife/kr
Mft. Ik/kr
IU»(MnM. *r
HlO. Ik/kr
Ot. 1
NO.. Ik/kr
niocitf. ft/stc

(•?










^










^










© LIQUID STMM M.
MTC, Ik/kr • 100
•P* '
torn SOLIDS, s
•H
itivtMiuu. *r
N|0. Ik/kr
SU.FITI. •!/!
UMAK. ag/1
CMiMIBC.B«/l
SKCiriC fiMvm
Cj)










CO










•W










Ci)










CO










ft










ft










ft










ft










0










ft










ft










o











-------
      TO strnm
               Figure 14-41.  St; Joe  Zinc-Co.
(continued)
ion
"
ri
r;
M
9
H
n
H
n
H
fl
n
H
'10
VI
in
11
11
11
"
11
it
ti
it
it
„.
in
Til
111
f

MM

i o rw
MM)
•iKtno
fut-vra*
KHMII HCKM
rvf
ti« uiimn if»
IICN CHUM tain in
rw*
WKI* kiwi fa*
Mn> U1-" w
LIU ULUTIW fV»
IICK tllUTI
SlA'l* 1UIVII M*
Mria iowi« rar
wmt WITH
l«t«
OICISTIl
KKtOI
uiri» mciriwin
HKIM
tm nvntiiuiioi
TU>
uiii* nomio"
inn
uiri* ««•» TIM
titun ITOMH T«B
ontiiumi
Wn* KCMTII
nun mm mnii
ITOMCt TWH
MUI.I* iwt
UM uunioi
coait (ma •«•
itnwi m> mil
COOLU («TI IMMII
nnmi
ly MMWIOI
im . nit
M 1 0 • IS «lt"
IM.OOO xra. looo "
NI HI. miMM
oirriMniit

IB) CM. I) HI. I »
4MOCM. Ill HI. now
in*
10*
M CM. 101 HI, to*
M CM. IK ni. X>»
l»»
to w
II CM. n HI. Ml*
»OCM. lent. ) ••
1 H* |lu/». C-IJO'I
10 1 c i 101 "1C"
KIP i ii "ia>
It 01 1.0 • II 11 KICK.
11.000 Ul
II 09 10 i II. U '1C",
11.000 CM

II 1.0 I » «IW.
II. SCO Mi
II 1 0 • II Kit"
n i o i » NIW

H me * iM*r
n 1.1. • it •!•«.
H.OOOIM
110 i 1 1 "1C"
I.M HU/MI ,
n ntt • i»*r
11. »» ru/i*.
• me
10 OU • <> «l«"
Bl KM 0 « Hit.
*iin«
( i . »
imo
c s . fiuiuns
o . Ku.a.s^

c s . nutitus
uno
'mo
t s . ruaaus
HUD

C 1 . I/I
C 1
nwoKio
NliUIWI-IU-
mino iiiuiio
mino TUMI*
c.i.. Bmi o>
IKtML Ul. «IO
MOOT MICI HMO
0(11 MOIt «»•
OUM
I.I MUt
M)
1

'

'i
«
1
1



1



1
t
'
1


1
''





1

1

-------
to
HI
CO
•MS1KMM.
MTC, IWkr « ION
Ktai 1900
MttflOUftS. IVhr
StU. IW»r
fBMMIUK. *F
"I». IWfcr
•t. *
•»*. lk/kr
KlOCin. ft/MC


LIOJIO STKM •.
mcrTOkr k !•
«•
WTNL IO.IBS, S
*
revoMUK. f
l««. W>r
MJITE. ••/!
suu«n. «i/i
CMMIK. •*!
VBIFK wwin
A

214


100






a










*

ISC


uo






o










®











%

nee


111





(D LIQUII smw •.
MH, 1h/fer « 1M
•»•
TOTAt SOLIDS, S
*
TUWMTIM, *F
NlO> W*
MFITt. i|/i
SULFATC, «|/1
CHLMIDC. «|/l
SPECIFIC cMVirr

O

1)00


111





o










o










o










<*>




120






6

110
10







^











$

•4


111





(J)











O

110


2fO





*

1*000


112






^




2(0






-------

                                                TO on sin
                                               •on tmnar
                                             CMnwn cumriaTm
                    Figure 14-42.  St.  Regis Paper Co.
VO
                                                                                    numor HIT
WHO.
n
"
«
SI
Tl
VI
MNE
F.D. FM
RECIRCUUTIM
WUCC-UP w
SEMium
ftECIRCUUTION
TANK
rtWTWI
size, rter




4000 CM.

MTtlliM.



lift SS
104 SS
1ICL SS
NO.
1
1
1
1
1
1
BAS SIMM HO.
Mn. Ik/kr I 10tf
•CM • 1000
MniOMTtS. Ik/lr
SOj. Ik/kr
TOVtMTUK, -F
«|0, IWfcr
Of. t
Mb. IkAr
ntOCITT. ft/MC

(P

ITS
400

42S





 100
1 90"
TOTW. SOLIDS. I
PM
TDVEWTDRE. *r
NjO. Ik/Nr
suiriH, «»/i
suir»it. m/i
CMORIH. «|/l
WtCIFlC GMVITt
(^)


loo?in
9.0






qp










(?)










(f)










^











-------
K)

O
                                    •Tti  ICMKwrr
                       ap—a
±a
    wil.
M


(D
               Figure  14-43.   Texaco  Inc., San Ardo
                                                                                EOUIWWT LIST
EQ NO.
A1
Fl
PI
P2
n
n
T3
VI
NAME
AISORIER
1.0. FAN
RECIRCULATION
RECIROM.ATION
PUMP
ABSORBER
RECYCLE TANK
VENTURI
RECYCLE TANK
CARBONATE
MIX TANK
VENTURt
SIZE. «ET
10 X « I IS LON6
200 HP
40 HP. 1200 GPN
40 HP, 800 SPN



12 I 22 X * LOW
MATERIAL
FIBERGLASS SHELL
FRP
C.S., RUB8ER-
LINEO
C.S., RUBBER-
LI NEO
C.S.
C.S.
C.S.
31«L SS
NO
3
0
3
3
1
3
3
3
MS S1KM m.
MTf . Ifc/Nr « 1000
•eta * 1000
NRTIOMTES, 11/kr
SOU. If"
TOVCMIUK. *T
»l». IWkr
t|. «
Mk. Ik/kr
mOCITT. ft/Me

(p

117


COO





(?)

TO


liO





®










0 LIQUID STREAK MO.
MTE. Ib/Nr » 100
*«•
TOTAL SOLIDS. S
*
TcmMTim. *r
MjO. 1k/hr
suiriTt, «»/i
star ATE. «i/i
CHLORIDE. *|/1
• swciric «Mfin
C5










d)










(7)










(?)










(?)










Q










^

1200








©










(^

100








^










o










(^










d>











-------
to
NJ
                                                                                                                             HIT
MS at ~ fl>
8
LnJ
^T^a^ <»
C^'* T^K"~~ . . : .
^ 	 r ^^ ^--^"

X
1
_  100
*•
TOTAl SOIIOS, I
*H
TENPERATUM. *F
H}0. Ib/hr
SUIFITE, *|/l
SM.FATE. -f/1
CM.ORIOE. •!/!
SPECIFIC GRAVITT
(D










(?)

300








CD

tso








d)




ICO





c$

iso








<5>




160





<£»




160





©










<>










(9










(ft










(^










u5»











-------
N)
NJ
TO JTUCt
.1
. r-t
a
a."*2

"""^ ^s^pup"
tl 1 1 tt
1 I"J « . ,_J _
L . , 	 * •
«J
Figure 14-45. T<

-

0
JL
If
ft i
a


pTMTi
<*
ixj









•t
«
M



o


®
9



jgul



- •
ti



10 IM


f.



iNMi-w win
O



m







EQ NO.
»1
fl
»1
01
Tl

T2
T$




WWE
ABSORBER
r.o. FAN
RECIRCUUmM
PU*
QUMCMtK
uquon HEM
TMK
RKMCULATiON
TANK
HEAD TANK



iguiworr us
SIIC. FEET
IS 01*. i IO.S H16H
2400 6m








T
MATERIAL
FLAKED GLASS LINED C.S.
1NCONEL US THATS
C.S.
INCONEL MS








NO.
t
2
«
t
2

I
I

6AS STREAM HO.
•ATE, lb/fcr • 1000
tefm * 1000
OAITICUUTES. lb/hr
SO}. Ib/kr
TEMWWTUM. *r
HiO. Ib/kr
Ot. *
•0.. Ik/kr
ruocni. n/Mc


iigoio STRUM M.
•ATE. Ik/kr » 100
V*
TOTA1 SOLIBS. t
*M
TOKMTME. *F
H}0. Ib/kr
SMiriTE. •(/!
SM.M1E. •«/!
CHLORIDE. •«/!
VIC IF 1C CMVITf
d)

ISt.l


3SO






G>

100








(ft

121.6


120






O

IS








0)











$










(|) LIDUIt STROM HO,
RATE. Ib/hr « 100
W"
TOTAL SOLIDS. 1
P"
TENPERATWIE. *F
HfO. Ib/hr
SULFITE. •(/!
SULFATE. «9/l
CHLORIDE. >|/l
SPECIFIC SRAVITT

$

•A-fl









e











o











o










^

1023









O










(O
Jflti

30








<8i










y>











O










(jh
Uli2



120






$










^

TQR









a










v

3 on









®










V

300











"iu









O










4

"-»«









^










4

0-50









$










6

200









9










"ft

20*









0











-------
                                TECHNICAL REPORT DATA
                          (Please read Instructions, on the reverse before completing)
 1, REPORT NO.
 EPA-600/7-79-067a
4. TITLE AND SUBTITLE
                           2.
                                                     3. RECIPIENT'S ACCESSION-NO.
 EPA INDUSTRIAL BOILER FGD SURVEY: Fourth
    Quarter 1978
                                                     5. REPORT DATE
                                                      February 1979
                                                     6. PERFORMING ORGANIZATION CODE
 r-AUTHOR(s) J.Tuttle, A.Patkar, D.Welch, M.Hessling,
 and M. Eckstein
                                                     8. PERFORMING ORGANIZATION REPORT NO.
B. PERFORMING ORGANIZATION NAME AND ADDRESS
 PEDCo Environmental, Inc.
 11499 Chester Road
 Cincinnati, Ohio 45246
                                                      10. PROGRAM ELEMENT NO.

                                                      EHE624
                                                      11. CONTRACT/GRANT NO.

                                                      68-02-2603, Task 45
12. SPONSORING AGENCY NAME AND ADDRESS
 EPA, Office of Research and Development
 Industrial Environmental Research Laboratory
 Research Triangle Park, NC 27711
                                                      13. TYPE OF REPORT AND PERIOD COVERED
                                                      Task Final; 10-12/78	
                                                      14. SPONSORING AGENCY CODE
                                                       EPA/600/13
IB. SUPPLEMENTARY NOTES IERL-RTP project officer is R. Michael McAdams, MD-61, 919/
 541-2915. Earlier related reports are in the EPA-600/7-78-052 series.
16. ABSTRACT
          The report gives detailed technical information concerning application of
 flue gas desulfurization (FGD) systems to industrial boilers. Design and operation
 data is presented for 172 FGD control systems (132 of them operational), designed to
 control SO2 emissions from 206 industrial boilers at 61 plants. With a 1978 capacity
 of 9.2 million scfm,  an average of more than seven new FGD systems have been put
 on line each year since 1972. Information in the report was obtained by a survey of
 plant personnel, control system vendors, regulatory agencies, and consulting engin-
 eering firms. The data is given in two types of tables: one gives summary informa-
 tion; the other, detailed information.  Summary tables present information as a func-
 tion of control process, control system vendor, disposal technique, operational sta-
 tus,  startup date, and flue gas capacity. Detailed information includes: control sys-
 tem design, economics, operating experience, problems and solutions, waste dis-
 posal techniques, and maintenance practices.
17.
                             KEY WORDS AND DOCUMENT ANALYSIS
                 DESCRIPTORS
                                          b.lDENTIFIERS/OPEN ENDED TERMS
                                                                  c. COSATI Field/Group
 Pollution
 Flue Gases
 Desulfurization
 Boilers
 Waste Disposal
 Maintenance
                       Pulping
                       Chemical Industry
Pollution Control
Stationary Sources
Industrial Boilers
13B
2 IB
07A,07D
13A
15E
                                                                             11H
18. DISTRIBUTION STATEMENT

 Unlimited


EPA Form 2220-1 (»-73)
                                          19. SECURITY CLASS (ThisReport)
                                          Unclassified	
                           230
                                          20. SECURITY CLASS (Thispage)
                                          Unclassified
                                                                  22. PRICE
                                        223

-------