USER'S GUIDE FOR THE
TOSS CONTRACT

TECHNICAL OPERATIONAL SUPPORT SERVICES (TOSS)

-------
         INTRODUCTION
      The purpose of this document is to assist Delivery Order
Project Officers (DOPOs) in using services provided under EPA's
Technical Operational Support Services (TOSS) contract. The TOSS
contract was awarded to Computer Services Corporation (CSC) in
September 1990.  EPA may exercise options to secure up to $347
million in services under the contract through September 1995.

      This User's Guide is structured to cover topics common to all
fixed price/indefinite  delivery indefinite quantity  (FP/IDIQ)
contracts as well as information specific to the TOSS contract. The
guide is organized into three major sections:

      •    Section I provides general guidance on authorities
           and responsibilities under federal regulations and
           policy governing the administration of contracts

      •    Section n provides specific information and guidance
           for users of the TOSS contract

      •    Section m describes the process and procedural
           requirements DOPOs must observe in initiating and
           managing delivery orders under the TOSS contract.

      Reference materials that may facilitate understanding of topics
discussed in the Guide are organized into five appendices to facilitate
users' access to them. A Glossary and Index are also included
following Section
TOSS User's Guide           August, 1991

-------
   TABLE  OF CONTENTS
                      SECTION I
    EPA CONTRACT ADMINISTRATION AUTHORITIES

1.    Overview of Contractual Roles, Responsibilities and
     Authorities	3

2.    Roles, Responsibilities, and Authorities of Contracting
     Officers	5

3.    Roles, Responsibilities, and Authorities of Project
     Officers	 7

4.    Roles, Responsibilities, and Authorities of Delivery
     Order Project Officers	 9
                     SECTION II
           TOSS CONTRACT INFORMATION

1.    Background and Structure of TOSS Contract	 13

     *     Pcnod or Pcrtonnflncc •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• 14
           Contract Management Officials.._......._..._._..................._	 14

2.    Services Available Under the TOSS Contract	  15


           Scope of Work Overview of Eight Service Areas	 15
           Examples of Contract Operating Sites	.... 19
TOSS User's Guide          August, 1991                     in

-------
Table of Contents
                           SECTION III
              TOSS DELIVERY ORDER LIFECYCLE

1.     Phase I:  Deli very Order Planning	  23

              Define Discrete Services Required			 23
              Determine Funding.......~...............................................	 25
              Communicate with Project Officer on Contract Usage.	 27
              Recommend a Delivery Order Pricing Arrangement	 27
              Prepare Planning Procurement Request (PR) Form 1900-8	 29

2.     Phase 2: Initiation of Delivery Orders	  31

              Obtain Required Forms and Documentation	 31
              Finalize Statement of Work	 33
              Complete a Labor Mix and Budget	 41
              Prepare Justifications	.•	 48
              Reference DO Checklist Prior to Submitting PR Package
                toPO		 49
              Establish Delivery Order Files	 49

3.     Phase 3: Monitoring the Delivery Order	  53

              Approve Contractor's Project Plan		 53
              Communicate Directly with Contractor Throughout
                Life of DO		 54
              Review Draft Deliverable* Within Specified Timerrame,
                Prior to Final Version	 54
              Monitor Performance Through Monthly Progress Reports	 55
              Communicate Contractor Performance Problems	 57

4.     Phase 4:  Initiation of Modifications	  59


              Propose Official Changes to SOW Through a Modification	 60
              Prepare Modification Request Memo		 62
              Submit Modification Request Package to CMT for Review
                Prior to Incorporating Changes -	 62
              Notify Contractor of Changes to the SOW	 64
5.     Phase 5: Monitoring and Approving Expenditures	  65

              Examine Monthly Invoices to Ensure Accuracy		 65
              Adhere to Prompt Payment Act for Paying Contractors	 66
n?                           August, 1991              TOSS User's Guide

-------
                                                    Table of Contents
6.     Phase 6: Delivery Order Close-Out	 67

             Deobligate Unused Funding Through Modification		 67
             Evaluate Contractor Performance		 68
             Identify Through Memo the Organization Maintaining
               or Using Deliverable		 68
             Review Final Invoice for Payment..........................—		 68
             Retain DO Records for Auditing Purposes		 69
       •      Account for Property ...•.»*.**.*».*..**..**..***»MH»*.***«»*«.»«»*..«.**....****.».»**07

Index  	71

Glossary.,	73



                         APPENDICES

Appendix A:  Contract Management Issues and Concerns	A-l

Appendix B:  Model Delivery Order Package with
              Sample Forms	 B-l

Appendix O  TOSS Delivery Order Forms	 C-l
Appendix D:  TOSS Contract Statement of Work-
              8 Service Areas	  D-l

Appendix E:  TOSS Contract Statement of Work -
              Labor Rates and Categories	  £-1
TOSS User's Guide            August, 1991

-------
Table of Contents
                     LIST OF EXHIBITS


H   Contract Management Structure for FP/IDIQ Contracts	 3

ffl-1  Delivery uraer Lifecyle	•••••	 22

m-2  Delivery Order Pricing Arrangements	 28

m-3  Develop Delivery Order Statement of Work	 34

"m-4  Elements Contained in A Statement of Work	 35-37

 m-5  Formal Work Request Procedure	 39

 m-6   Request for Brief or Brief Support Form	 40

 m-7   Labor Categories	••- 43-46

 in-8   Example of a Labor Mix  and Budget	:	 47

 m-9   Checklist of Items Included in a Delivery Order
       Package	-	50

 ffl-10 Frequently Requested Modifications	-	 61

 A-l   Prohibited Contracting Activities at EPA	 A-4

 A-2   Activities of Potential Vulnerability	 A'5

 A-3   What to Review in Non-Team Subcontracting
       Proposals	•	 A"15

  A-4  Key Points to Remember Regarding the Review
       of Non-Team Subcontractor Proposals	,	 A-16
                           August, 1991            TOSS User's Guide

-------
      SECTION I

      EPA CONTRACT
    ADMINISTRATION
       AUTHORITIES
    Section I of the User's Guide focuses on the contract
management authorities, roles, and responsibilities. of EPA
Contracting Officers (CDs), Project Officers (POs),and Delivery Order
Project Officers (DOPOs) under fixed price/indefinite delivery,
indefinite quantity (FP/IDIQ) contracts. The authorities, roles, and
responsibilities of the individuals in these positions provide the
framework for effective implementation and management of these
types of contracts.
TOSS User's Guide        August, 1991

-------
     1.   OVERVIEW OF CONTRACTUAL
          ROLES, RESPONSIBILITIES
          AND AUTHORITIES
     The Federal Acquisition Regulations (FAR) define a contract as
"a mutually binding legal relationship obligating the seller to furnish
supplies or services and the buyer to pay for them (FAR 2.101)." COs
are the only persons with the authority to enter into and sign contracts
on behalf of the Government. However, within EPA, COs rely on POs
and DOPOs to assist them in. administering FP/IDIQ contracts.
Effective management of an FP/IDIQ contract requires direct liaison
between the CO, the PO, and the DOPO during the life of the contract.

     Exhibit M, below, illustrates the typical organizational
structure for managing FP/IDIQ contracts.
                    EXHIBIT M

   CONTRACT MANAGEMENT STRUCTURE FOR FP/IDIQ
                    CONTRACTS
CONTRACTING OFRCER
1
PROJECT
OFFICER
1
DEUVERY ORDER
PROJECT OFFICER
1
CONTRACTOR


I

1

j
TOSS User's Guide          August, 1991

-------
      2.    ROLES, RESPONSIBILITIES
            AND AUTHORITIES OF
            CONTRACTING OFFICERS
      Only the CO has the authority to enter into, administer, and/
or terminate contracts for the Government  and make related
determinations and findings (FAR 1.602). In conjunction with this
authority, the CO has responsibility for a variety of pre-solidtation
and post-solicitation activities to ensure that the Government enters
into equitable transactions with contractors.  Under an FP/IDIQ
contract, the CO has the following responsibilities to ensure effective
contract management

      •    Issue delivery orders and modifications to delivery
           orders

      •    Negotiate and execute contract documents for
           contract modification and termination

      •    Approve contractor requests for facility modifications

      •    Monitor contractor performance to ensure compliance
           with quality assurance requirements and contractual
           terms for schedule, cost, and technical performance

      •    Evaluate and approve subcontractor plans, including
           the use of small businesses or small disadvantaged
           businesses and monitoring subcontractor
           performance

      •    Maintain contract records, perform related
           administrative functions, and issue administrative
           changes to the contract

      •    Perform property administration functions including
           acquisition and disposal of contractor inventory.

The CO is responsible for ensuring that the Government performs
actions required by the contract The CO must also ensure that the
contractor is  not unreasonably hindered or prevented from
performing the contract.  The CO  must act in good  faith in
administering  the contract and perform all duties that affect the
contractor expeditiously.

TOSS User's Guide           August, 1991                      5

-------
      3.   ROLES, RESPONSIBILITIES
           AND AUTHORITIES OF
           PROJECT OFFICERS
     The FO serves a central role in ensuring effective contract
management and is the primary source of information and contact
with the DOPO. The PC's contracting authority is delegated by theCO
and limited to specific contract management tasks. EPA's Contract
Management Manual (CMM, Chapter 7)  defines critical
responsibilities of the FO as follows:

     •    Initiates procurement actions

     •    Evaluates contractor proposals

     •    Certifies contractor monthly invoices
                                                     •
     •    Assists Agency officials (such as DOPOs) in writing
           statements of work

     •    Prepares delivery order for signature by the CO

     •    Reviews contractor progress reports, financial reports,
           and deliverables

     •    Reviews contractor requests (such as subcontractor
           consent) and recommends approval or disapproval to
           the CO

     •    Assists the CO in resolution of problems associated
           with contractor performance

     •    Acts as the CO*s representative for monitoring other
           technical aspects of contract performance after award.
TOSS User's Guide           August, 1991

-------
      4.   ROLES, RESPONSIBILITIES
           AND AUTHORITIES OF
           DELIVERY ORDER PROJECT
           OFFICERS
      The DOPO has the most direct contact with the contractor
during the performance period and is essential in ensuring that
quality products are delivered. The DOPO has several responsibilities
specified in EPA's Contract Management Manual (CMM, Chapter 7)
as:

      •    Defines work requirements for the PO to use in
           preparation and issuance of delivery orders under
           IDIQ contracts

      •    Monitors contractor performance after delivery order
           award

      •    Evaluates the technical performance of a specific
           delivery order

      •    Reviews applicable portion of monthly technical and
           financial reports, contractor invoices for payment, and
           delivery order modifications.

The DOPO is the primary Agency contact for technical performance
of the delivery order and must, therefore, have strong technical
knowledge of the work to be performed.

      Failure to meet these responsibilities may result in the
DOPO's decertification. This could seriously affect an EPA
employees'-ability to carry out their performance standards. The
DOPO should never mislead a contractor in such a way as to cause
work to be performed that is not included in the Statement of Work of
the Delivery Order.  Specifically, the DOPO may not request the
contractor to work outside the period of performance, increase the
level of effort or cost or change deliverables and due dates without
following procedures for requesting modifications  to the Delivery
Order.
TOSS User's Guide          August, 1991

-------
Section I: Contract Administration
      The  Procurement and Contracts Management  Division
(PCMD)  has restrictions regarding  the allowable workload for'
DOPOs. The restrictions are in terms of the experience required on
various Delivery Orders and the workload limitations. They apply to
the total value of two or more orders administered at any given time.
Experience
Required
0-6 months
6 months
12 months
over 18 months
Contract
Size
$0-$250K
$250K-$500K
$500K-$1M
$1M
Workload
$500K
SIM
$2M
$5M
                         August. 1991
TOSS User's Guide

-------
  SECTION II
  TOSS CONTRACT
TOSS User's Guide   August. 1991       U

-------
      1.   BACKGROUND AND
           STRUCTURE OF TOSS
           CONTRACT
      EPA recently awarded the Technical Operational Support
Services (TOSS) contract to Computer Sciences Corporation (CSC).
The TOSS contract, valued at $347 million, is an example of a fixed
price, indefinite delivery, indefinite quantity (FP/IDIQ) contract.
Individual delivery orders are issued under this contract and can be
either fixed price or ceiling price  Delivery orders are contractually
binding documents that indicate specific services and products the
contractor is to provide to the Agency which are within  the
specifications or boundaries of the TOSS contract. It is essential that
each DOPO understand the terms and conditions of the TOSS contract
and the scope of work under this contract The following section
provides basic information about TOSS. The information provided
below is not a substitute for the original contract statement of work,
with which each DOPO should be familiar.
TOSS User's Guide           August. 1991                     13

-------
Section II: TOSS Contract
                  TOSS CONTRACT

   Period of Performance:   Sept. 28,1990 - Sept. 30,1995.

   Value: $347,475,453.00.

   TOSS Contract Management Officials:

   Contracting Officer (CO) Lawrence A. Schlosser
                         US EPA
                         (PM-214F)
                         Washington, DC 20460
                         Phone (202) 475-8508
                         Email: EPA 3518
                         FAX- (202)472-5114

                         Jennifer T. Johnson

                         Brenda Daly
                         US EPA
                         OARM
                         Washington, DC 20460
                         Phone:  (202) 382-2392
                         Email: EPA 3763
                         FAX (202)475-6156

                         OIRM — Management Planning
                         and Evaluation Staff
                         US EPA
                         Washington, DC 20460
                         Phone: (202) 382-2381
                         FAX (202)475-6156
Contract Specialist

Project Officer (PO)
Contract Mgmt Team
14
                     August, 1991
TOSS User's Guide

-------
     2.    SERVICES AVAILABLE UNDER
           THE TOSS CONTRACT
Purpose'


     The purpose of the TOSS contract is to provide Information
Resources Management (IRM) technical and operational computer
system support required by EPA Headquarters Offices, Regional
Offices, Laboratories, and other Agency sites in order to meet EPA's
mission.
Scope of Work Overview


      There are eight technical and operational computer system
support service areas included under the TOSS contract. They are:

      •     Facilities Management/Operational Support

      •     Document Processing, Publication, Graphic and
           Micrographic Support

      •     Office Automation and Records Management

      •     Telecommunications Support

      •     LAN Support

      •     Microcomputer/Personal Computer Technical
           Support

      •     Information Center Support

      •     Applications/Systems Development Support.

Each service area is briefly described on the following pages. The
TOSS Contract Statement of Work in Appendix D has detailed
descriptions of each service area.
TOSS User's Guide           August, 1991                     25

-------
Section U: TOSS Contract
 The contractor will provide facilities management and operations
 support that includes operation and management of computer
 centers. Within the scope of Facilities Management computer
 operations services shall include but not be limited to: .
  •  Computer Room Support
  •  Controlling and
    Monitoring the Computer
    Systems Hardware
  •  Data Entry /Data
    Management
  •  Machine Edit
  •  Data Analysis/Verification
       Database User Support
       System Hardware Logistical
       Support
       Managing Tape and Disk
       Resources
       Record Keeping
       Reference Library.
ft ."' «^"- ^..:j
                                                  ^f^;
 This area of service includes document processing, publication,
 graphic, and micrographic support as directed by individual
 delivery orders. Support services may include, but are not limited
 to:
    Operation of Data Plotting  •
    Equipment
    Analyses of Graphic Needs •
    Printing of Documents
    Documents Processing     •
    Micrographics            •
    General Art and Original   •
    Drafting                 •
    Still Photography
       Typing of Manuscript
       Covers
       Checking and Marking
       Page Proofs
       Mechanical Editing
       Substantive Editing
       Proofreading
       Documentation.
16
August, 1991
TOSS User's Guide

-------
                                  Services Available Under the Contract
  This area of service includes, but is not limited to:

     File Maintenance
     Automation of Office Functions
     Maintenance of Library Collections
     Maintenance of Clearinghouses of Information on
     Special Subject Areas or Initiatives of Concern to EPA
     Management, Maintenance, Retrieval, etcr of Records
     Maintenance of Dockets of Official Legal Activities.
                                              ,
  This area of service shall provide technical services related to voice
  and data  telecommunications support, including technical
  assistance and advice on telecommunications requirements, and
  definition  of new service specifications.  The contractor shall
  identify system needs, support requirements and problems, and
  shall monitor the quality of system service to individual site
  locations.
  The contractor shall provide technical support services necessary
  for the design of LAN hardware and software configurations and
  presentation  of functional capabilities,' requirements,
  implementation, operation, modification, and logistical support
  during the LAN life-cycle.  The contract will not be utilized to
  acquire workstations or other LAN system components which
  may be available through EPA national contracts.
TOSS User's Guide
August, 1991
17

-------
Section II: TOSS Contract
 This area of service requires the contractor to provide PC technical
 support services in the areas of PC system hardware configuration
 and software design, installation, implementation, operation,
 modification, problem  diagnosis and resolution, and related
 training.
       TOSS Contract AHadunentA-
 Under this area of service, the contractor shall provide end- user
 computer support of EPA staff at selected Agency locations during
 scheduled Information Center hours. Software support and
 instruction shall be given both in formal classes and on a walk-in
 basis, and shall include basic computer applications, spreadsheet,
 database, desktop publishing, PC networking, graphics, word-
 processing and other technologies.
      ; . •  « • d« i .  •  ••  y" ' "«•  • •*. ** i*"1" '"—,'""     •   % ?  •  fmmf; . ' ' '
      AppIicaild^Syfiibeiiill^
      '"^roSS-Conttt^;JaMS«ntt^r: ^"   	'"
*/:
 This area of service will require the contractor to design, develop
 and/or implement application systems comprised of multiple
 software modules, or single purpose, stand alone software.
 Services shall include, but not be limited to:
    Statistical Analysis
    Requirements Analysis
    Systems Analysis
    System Design
    Program Design
    Implementation
                           System Installation
                           System Evaluation and
                           Audit
                           Training
                           Documentation
                           Software Quality
                           Assurance.
                         August, 1991
                                         TOSS User's Guide

-------
                                 Services Available Under the Contract
Examples of Contract Operating Sites
      Under the TOSS contract, technical support and management
services and/or the establishment of a local office can occur at any
EPA field location, including, but not limited to, the following EPA
sites:
Ada, OK
Anchorage, AK
Annapolis, MD
Ann Arbor, MI
Athens, GA
Atlanta, GA '
Bay Saint Louise, MO
Beltsville, MD
Boise, ID
Boston, MA
Chapel Hill, NC
Chicago, IL
Cindnnati, OH
Corvallis, OR
Dallas, TX
Denver, CO
Duluth, MN
Durham, NC
Edison, NJ
Grosse Isle, MI
Gulf Breeze, Fl
Honolulu, HI
Houston, TX
          HuntsvUle, AL
          Juneau, AK
          Kansas City, MO
          Las Vegas, NV
          Lexington, MA
          Manchester, WA
          Montgomery, AL
          Monticello, MN
          Newport, OR
          Newton, OK
          New York, NY
          Olympia,WA
          Philadelphia, PA
          Portland, OR
          RTP,NC
          Sacramento, C A
          San Francisco, CA
          Santurce, PR
          Seattle, W A
          Warrenton, VA
          Washington, DC
          Westlake,OH
          Wheeling, WV.
TOSS User's Guide
August.1991
19

-------
     SECTION III

       TOSS DELIVERY
     ORDER  LIFECYCLE
     DOPOs have primary responsibilities for six major phases of
delivery order (DO) management under FP/IDIQ contracts in EPA as
show in Exhibit EM:

     •    Delivery Order Planning

     •    Initiation of Delivery Order

     •    Monitoring the Delivery Order

     •    Initiation of Modifications

     •    Monitoring and Approving Expenditures

     •    Delivery Order dose-Out.


Exhibit ffl-1 indicates the key decisions to be made and the primary
documentation required during each major phase from the initial
planning and definition of work through doseout.

     Effective planning is essential to successful performance of
contract services and products. Building the quality into the work
from the initiation of the DO not only facilitates management and
decision making throughout the DO lif ecyde but also is in accord
with EPA's emphasis on Total Quality Management The DOPO
should dearly specify the work to be performed, define performance
and quality standards to be met and communicate these expectations
to the contractor.

TOSS User's Guide         August, 1991                 21

-------
Section fit Delivery Order Lifecycle
                            EXHIBIT m-1
                   DELIVERY ORDER LIFECYCLE
  Key Decisions
     Phases        Required Documentation
         What
       services are
      required from
       contractor?
       is the best
    way to describe the
      work require*
         merits?
        Do any
       parts of the
       SOW need
       to change?
1. Delivery
   Order
   Planning
2. Initiation of
   Delivery
   Orders
3. Monitoring
   the Delivery
   Order
                        Statement of non-duplication of effort
                        Procurement Rationale (Form 1900-8)
                      • Designation of DOPO/Alternate
                         (Form 190045)
                      • Administrators screens for Prohibited
                         and Vulnerable Activities
                      • Procurement Rafionale(Form 1900-8)
                      • Statement of Work
                      • Labor Mix and Budget
                       Memo
                       Description of SOW changes, or
                         budget or Form 1900-8 or 1900-65
      performance
      satisfactory?
4. Initiation of
   Modifications
                     • Project Plan
                       (or revised Project Plan)
                     • Project Plan approval form
                     • Progress/Financial reports
         Do the
       tone work
        «tormed?>
5. Monitoring
   and Approving
   Expenditures
                                              Invoice approval term
        Did the
       COIIB actor
        fulfil DO
     ^requirements?/
6. Delivery
   Order
   Close Out
                     • Form 190W (for deoWgalion)
                     • Memo
                     • Evaluation Form
22
         August, 1991
                                  TOSS User's Guide

-------
 PHASE 1.    DELIVERY ORDER
                 PLANNING
      The DOPO starts the delivery order process with a series of
steps to define what work EPA needs and how the delivery order will
be structured and funded. Key steps include:

      •    Define discrete services required

      •   - Determine funding

      •    Communicate with Project Officer

      •    Recommend a delivery order pricing arrangement

      •    Prepare planning procurement request (Summer
           Planning Cycle).

The information and decisions that the DOPO needs to provide to
facilitate approval of the DO are discussed below for each of these
major steps.
Step 1: Define Discrete Services Required


      The first planning step is to define what services are needed.
There are three major considerations—specification  of services,
mission support and non-duplication of effort
      Specify Services and Products Needed

           The more dearly a DOPO identifies the Agency's
      requirements, the more knowledge all parties to the delivery
      order can share about the quality of the work to be performed.
      The DOPO should develop a list of needed services and/or
      products and the corresponding program areas they support
      and enhance.  This early definition of the Agency's needs
      becomes the foundation for developing the DO statement of
      work (SOW).

TOSS User's Guide           August, 1991                      23

-------
Section HI: Delivery Order Ufecycle
      Emphasize Mission Support

            The DOPO should also dearly define how the proposed
      services support an overall program mission. It is important to
      identify these services in1 terms of their contributions to EPA's
      strategic mission and goals as well as their immediate value to
      the office requesting the services. Some delivery orders may be
      one segment of a larger effort attempting to achieve a long-term
      program goal.  The DOPO should assess and document the
      immediate as well as the longer-term contributions the Agency
      wants from proposed services and/or products, particularly
      how they promote the achievement of strategic IRM  program
      goals and policy objectives.
      Ensure Non-Duplication of Effort

            Before the DO can be processed, the DOPO must ensure
      that no other efforts exist which would duplicate or contradict
      the intentions of the proposed services and/or products. This
      requires investigation into other related procurement
      activities, past or present, to determine if similar work is being
      performed. If similar work is identified, the DOPO must
      evaluate whether these services and products could fulfill the
      requirements of the proposed delivery order. The purpose of
      this inquiry is to ensure that the Agency avoids paying for an
      existing service or product more than once. The DOPO must
      document through a memorandum that there is no duplication
      of effort, or that there are complementary, but not duplicative
      efforts. This memorandum becomes a part of the DO package.
      Appendix B provides an example of this memo.
24                       August, 1991            TOSS User's Guide

-------
                                           Delivery Order Planning
Step 2: Determine Funding


      One of the most critical decisions the DOPO must make is to
determine the appropriate level and type of funding for the delivery
order. Several issues may need to be considered, including whether:

      •     Services are severable or non-severable

      •     Multiple appropriations are appropriate

      •     Partial funding from Superfund resources is
           - appropriate.

      The decision that delivery order services are either severable or
non-severable affects  how specific services may  be organized  to
promote continuity of support. Services are classified as severable if:

      •     Work can be interrupted without affecting the overall
            program mission or specific purposes of the delivery -
            order

      •     The scope of work is general

      •     Work tasks are repetitive and provide routine
            continuous products and/or services

      •     Services are provided throughout a specified period
            of time corresponding to the beginning and end of the
            fiscal year.

      Services are generally considered non-severable if:

      •     Interruption of the work may deny EPA of an end
            product or completed service critical to program
            mission

      •     The scope of work is definitive

      •     Tasks or products are non-repetitive

      •     Service is for a single project that may cross fiscal
            years.
TOSS User's Guide            Augiat.1991                        25

-------
Section III: Delivery Order Lifecycle
Questions about severable and non-severable services should be
directed to the PO for specific interpretation and advice.

      Given the scope of the statement of work, it may be appropriate
to fund the delivery order from multiple appropriations rather than a
single source.  The DOPO should determine if there is sufficient
evidence to justify that the delivery order will benefit more than one
appropriation.  If the DOPO does conclude there is a convincing
argument, then the DOPO should allocate delivery order costs
according to a clearly defined methodology. Two methods include:

      •     Direct Association - invoiced costs for each
            appropriation can be easily identified on the invoice

      •     Allocation Method - used for severable services where
            separate appropriation cannot be distinguished on the
            invoice. The allocation is based on funding
            appropriations provided by each program office.

      Superfund resources may fully or partially support a delivery
order.  There are three major rationales for allocating Superfund
resources depending upon how the Superfund program is supported
by the delivery order services and products:

      •     Percentage of EPA staff (as measured by salary and
            expense estimates) working directly on Superfund
            program activities

      •     Percentage of actual Superfund work supported
            directly by the activities of the delivery order (for
            example, if one-third of the delivery order services or
            products benefit staff in the Superfund program)

      •     Percentage of total fiscal year EPA appropriations
            allocated to the Superfund program.

Again, the DOPO should consult with the PO to determine the
appropriate application of Superfund resources to the delivery order.
26                        August, 1991            TOSS User's Guide

-------
                                          Delivery Order Planning
Step 3:  Communicate with Project Officer on Contract
         Usage


      The FO is the DOPCXs initial resource in developing the DO.
The DOPO should notify the appropriate FO of the intent to use a
particular contract as soon as the scope of proposed services and/or
products is defined. The FO can provide feedback on whether the
proposed DO falls within the scope of the contract or redirect the
DOPO to other contract vehicles if necessary.  The PO can answer
specific questions such as those pertaining to the available contract
dollar ceiling or whether the proposed services are within the contract
scope.  The FO will also alert the DOPO to any restrictions  or
approvals that may be required for using the contract.
Step 4:  Recommend a Delivery Order Pricing
         Arrangement


      Many  FP/IDIQ contracts offer  alternative pricing
arrangements for individual DOs. The TOSS contract, for example,
offers either a fixed price or a ceiling price arrangement.  These two
pricing arrangements are different in the level of detail and emphasis
placed on the services and/or products under the DO. Fixed price
DOs are generally used when work specifications can be  dearly
defined. Ceiling price DOs, on the other hand, are more appropriate
when the work requirements cannot be dearly defined in advance,
such as when a system applying a new technology being introduced
to EPA is being designed.

      Exhibit m-2 will highlight the criteria for using either the fixed
price or the ceiling price  DO, the  advantages of each type, and
examples of services which lend themselves to either the fixed price or
the ceiling price delivery order. The TOSS Contract, Attachment A -
Sections 5.6.1 and 5.6.2 contain more specific information about fixed
and ceiling price DOs.
TOSS User's Guide            August, 1991                        27

-------
Section IE: Delivery Order Ufecyde
                        EXHIBIT III-2

   DELIVERY ORDER PRICING ARRANGEMENTS
  Recommended
       Use
     Criteria
Specifications for the
service or product to be
delivered an be defined
in detail.

Professional standards
or experience provide
measures for evaluating
performance.
                   Price for development of
                   the serivce or product to
                   be delivered can be
                   estimated reliably.
                                          Specifications for the work
                                          to be pei fuilined cannot be
                                          defined in detail.
More complex and
performance sensitive tasks
where performance and
quality'are critical to
acceptability of the work.

Performance criteria and
price cannot be specified
due to lack of experience.
                   Contractor assumes
                   greater risk for
   Advantages
                     rtc
                   Management of delivery
                   order tasks is expedited.
                      •Government assumes
                      greater risk for
                      performance.

                      Continuity and delivery of
                      services and support are
     Examples
                   System design
system programming

System implementation/
testing

Systems training

System documentation/
Manual preparation.
System hardware/software
maintenance

Data entry

Concept feasibility studies


Requirements definition.
28
        August, 1991
         TOSS User's Guide

-------
                                          Delivery Order Planning
Step 5:  Prepare Planning Procurement Request (PR),
         Form 1900-8 for Summer Planning Cycle Only
      The results of the planning cycle are communicated to the PO
through the Planning Procurement Request (PR)- The PR/Form
1900-8 is required for procuring products or services and indicates
what items are to be procured, their cost, and associated accounting
data. The PO usually requests the submission of the planning PR
during the summer as  a complementary activity to EPA's budget
planning process. The early submission of PRs from all DOPOs who
plan to use the contract during the upcoming budget year helps the PO
determine how to manage the contract and the workflow of DOs to
ensure responsive service.

      Because the planning PR is usually submitted several months
before the DOPO needs to initiate the DO process, it must be updated
to reflect the DOPOs current needs, funding  arrangements  and
milestones. The planning PR can be used as an input for preparing the
PR that will be included with the DO  submission package.  An
example of a completed form is contained in Appendix B, and a blank
copy can be found in Appendix C.
TOSS User'a Guide           Augiut,1991                       29

-------
 PHASE 2.    INITIATION OF
                 DELIVERY ORDER
      The second phase in the delivery order lifecyde is the actual
production of the delivery order. The six steps included in this phase
are described below:
      •    Obtain required forms and documentation
      •    Finalize statement of work
      •    Complete labor mix and budget
      •    Prepare justifications
      •    Reference DO checklist
      •    Establish DO files.
These steps  will result in a complete package ready for the PC's
review.  Appendix B contains a completed model delivery order
package.

Step 1:  Obtain Required Forms and Documentation

      The first step in this stage is to ensure that the forms and
supporting  documentation required for the DO package  are
completed accurately. In this step, the components that must be
included in every DO package are:
      •    Form 1900-8, which is the Procurement Request
      •    Form 1900-65, which is the designation of the
           Delivery Order Project Officer
      •    Administrator's screens
      •    Rationale for ceiling price if applicable
      •    Non-duplication of effort.
TOSS User's Gidde           August, 1991                     31

-------
Section III: Delivery Order Lifecycle
Examples of the completed forms can be found in Appendix B'and
blank copies are located in Appendix C

      As discussed in Phase 1, Form 1900-8, the Procurement
Request, should be prepared as early as possible. The DOPO may need
to follow up during the signature process to ensure that no delays are
encountered and to answer any questions.

      In addition to Form 1900-8, the DOPO must also prepare Form
1900-65, which is the Designation and Appointment of Delivery Order
Project Officer. The purpose of this form is to nominate individuals to
the positions of DOPO and Alternate DOPO for each new DO. There
are several key points to keep in mind when preparing Form 1900-65:

      •     Nominees must be certified to act as DOPOs and
            Alternate DOPOs through contract administration
            training

      •     Uncertified nominees can request interim certification
            as a DOPO prior to training

      •     Uncertified nominees can request a waiver to become
            exempt from training

      •     Any nominee assuming DOPO authority prior to
            approval must notify the PO of this action.

Nominees  must prepare a memo to request either an interim
certification or waiver and explain the circumstances that necessitate
the special  request.  The PO can provide additional information
needed for these request memos.

      The DOPO must also fill out the Administrator's screens which
are checklists used to determine whether the work to be completed
for EPA is considered a prohibited or potentially vulnerable activity.
Further  discussion of the Administrator's screens can be found in
Appendix A, and a completed example is contained in Appendix B.

      As previously discussed in Phase 1, Delivery Order Plannning,
the rationale for ceiling price delivery order should be completed if
necessary, as well as the non-duplication of effort statement. After the
required documentation  has been completed and signed, all
paperwork should be retained for inclusion in the DO package.
32                       August, 1991            TOSS User's Guide

-------
                                         Jm'hahon of Delivery Order
Step 2:  Finalize Statement of Work (SOW)


      Step two of initiating a  DO is to  draft the delivery order
statement of work.  The SOW  describes  the services or products
required  from the contractor, and indicates when they are to be
provided. It is important that the services or products described fall
within the contract scope of work, and that prohibited contracting
activities are avoided.  Reference "Prohibited Use of Contracting
Services/' Appendix A, and Section H, Toss Contract Information, for
details.

      The SOW  is the vehicle that details the  contractor's
responsibilities. Therefore, producing a well-written SOW is essential
to me effectiveness of the contract Services are provided based on the
contractor's understanding of task descriptions in the SOW. The table
presented in Exhibit ni-3  presents some basic guidelines for
producing a well-written SOW. Appendix D contains a model SOW
in the DO package to be used for reference.

      All SOWs must contain  certain information.   The chart in
Exhibit m-4 describes 14 elements that should be included in all DOs.
The title of the elements are indicated, along with a description of the
required content and level of detail to be provided for each element.
DOPOs should refer to these 14 elements as an outline when drafting
a SOW. After the SOW  has been prepared, DOPOs are advised to
submit the SOW to the PO for initial  review and comments.
Incorporating changes to the SOW may reduce the need for further
clarifications during the CO/PO review process.

      Under ceiling price delivery orders for the TOSS contract, a
formal work request procedure is employed when work can not be
adequately specified at the  task level.  The formal work request
procedure is particularly appropriate when the task involves the
performance of repetitive, short-duration services. The success of the
formal work request procedure is dependent upon how well it is
managed by the DOPO.
TOSS User's Guide            August. 1991                       33

-------
Section III; Delivery Order Lifecycle
                    EXHIBIT m-3
   DEVELOP DELIVERY ORDER STATEMENT OF WORK

• Direct and to the point
sentences
• The use of active voice,
such as "shall," rather than
"should"

• Definitions for uncommon
terms and acronyms
• Gear and precise
definitions of the services
and products to be
acquired

• Specific references to the
general contract terms and
conditions

• Explanations of concepts
that are central to the SOW

• Criteria which permit
inspection and acceptance
to take place

• Enough specification to
allow for an independent
contractor relationship

• Complete work
descriptions

••' fc'.jjfW&'K'S' •'.;'••'? ;* .•".». •' 	 ' .-, '. . v»
.. ' .^^WSUtWKII"l.liN'SOWS:- .-*"• •
*%\^^fe^li*»OID JSli^l?''"* -'<•'•"• '
• Long or complicated
sentences
• Ambiguous phrases like "as
required" or "as necessary"

• 'Bureaucratic' terms

• Excessive abbreviations
• Internal inconsistencies
in the substance of work
requirements

• Underlying assumptions
in the SOW, without
explanation

• Language which would
increase the potential for
a personal services
relationship to develop

• Phrases like "will work
closely with the DOPO,"
which fail to identify the
nature and extent of the
EPA/contractor relationship

• Using technical direction as
a substitute for a complete
specification

34
August, 2992
TOSS User's Guide

-------
                                                      Initiation of Delivery Order
                              EXHIBIT m-4

    ELEMENTS CONTAINED IN A STATEMENT OF WORK
  1. Title
               • Name that references
                the DO
                                       • DOobjeeUvw

                                       * Nttncs of systems to be
                                         supported
                         Short and
                         CWSOJTIptlVC
2* Period snd
  Place of
                              date CO
                   signa DO and date last
                   oeJiversBw 0 ctiM

                 • Where DO work will
                   uke place
                                       • Beginning and end dates

                                       * uocstton of wofli
                                         premisei
                         Exact data
  3. DO Project
    Officer
                approved to function as
                DOPO en DO
                                       DOPO aid Alternate DOPO
                                       DOPOroune
                                       -  addresses at EPA
                                       -  commercial phone «s
                                       -  FI5 phone «s
                                       •  Email «s
                                       -  Faxts
4. Project
  Background
                   Histories! orison of the
                 * Envnoiisient
                   surrounding me project
• Events leading to
  development of project

• How project helps meet
  •WBlfliMftWMI*A ffMt*aVitfWl
                                                                Desoriptive
                                         • Otfe
                                           the project'

                                           Obfscttvts of pragnm
  5. Purpose
                Sbrtemntoiwh.it

                     of the tautt viduu
                   9OOO9
                   DO)
                                       • Objectives of this DO

                                       • Related to project
                                         Mcka^ound
                         Spedflc
  6. Task
               • Outline of spedflc work


                pBTOffll 10 aKOOOIpiUn
                        OOJBCDVC9
                                       • What is to be
                                         aoDOOipushed

                                       • Direction on any spedflc
                                         im>thjvtfJj^j*t^^ ftn IM*
                                         imfarawJ

                                       • DeveJopoient of Prosxt
                                         Plan as first task

                                       * Functtonax perfofBianos
                                         and ocslsjn speoncstions
                                                                  Spedflc
                                                                  enouyi so
                                                                  OOflttSjCtOT
                                                                  en work
TOSS User's Gride
                               August, 1991
                                                                          35

-------
Section m Delivery Order Lifecyde
                    EXHIBIT III-4

   ELEMENTS CONTAINED IN A STATEMENT OF WORK
                      (CONTD)
^r^ri^^^

7. DcsQiption
DeUverables

Procedures
for
DeUverables

9. Schedule of
Talks*
DeUverables
10. Remrttfiff
n_i_i 	 i

11. Labor Mix

'iK$&iie^&$aMii>*

• Identifies the material
requirements related
to submission of items
• Identifies what criteria
will be used to judge
the contractor's results

• Timefnmes given to
complete individual
requirements in the
SOW


and DOPOs whether
In written or nenng
ram
their qualifications
MoesBvy to cuBipute
' the DO work

i^tiatttiiil***' ' * "^'':

• -What" Is due to
and *How Many*

opinions
• Identifies references
* Reviews periods
of draft snd finsi
• Task numbers
coordinated with
individual deliverable*
• Due dates given in
days, weeks, months


reports
• Schedule of Briefings
• Form in which rcpoiti
are to be deUvered (disk
version or paper copy)
• Specific reports
• Names of categories

•i&.-Qfr^i^-: -x.
^SSl^
Specific (or
determinable)
dates and
other specific
&w4Hr
information

Define schedule
within the POP
Realistic
lAlUTJI Amfi^aA


Specific

                       August, 1991
TOSS User's Guide

-------
                                                  Initiation of Delivery Order
                           EXHIBIT IH-4

    ELEMENTS CONTAINED IN A STATEMENT OF WORK
                               (CONTTJ)
 11 Estimate of
    Staffing by Task
    in Ubor Hours
• Estimate of
  contractor time
  needed to complete
  etch task
• Ink number

• Labor categories

• Hours far each Ubor
  category
SpedBe
 13. Areas of
    SpedalConom
• Identifies any
  potential Issues or
  problems that could
                               on
• Privacy conskieraDOiis

• Conflict of interest

• Areas of vulnerable
Stated in
general terms
 14. Sections of
    Contract So
    of Work
    Authorizing
    this DO
          nto stated
  in the contract which
  the DO will fulfill
• Contract sections

• Contract subsections
Specific
TOSS User's Guide
            August, 1991
                               37

-------
Section UL Delivery Order Lifecycle
      The formal work request is an extension of the statement of
work set forth in the delivery order.  Exhibit ffl-5 illustrates  the
relationship between the formal work request procedure, the delivery
order, and the TOSS contract Formal work requests are made by the
DOPO using a form such as the one provided in Exhibit ffl-6 as an
example.  All formal work requests must include:

      •     A detailed description of the services requested

      •     The specific deliverables requested

      •     The dates by which all deliverables are required

      •     Evidence of authorization by the DOPO

      •     Performance/Oversight notes

      •     Evidence of deliverable acceptance or rejection

      •     Other refinements to account for the peculiarities of the
            specific activity involved.
38                        Atigust.1991            TOSS User's Guide

-------
                                     Initiation of Delivery Order
                    EXHIBIT m-5

      FORMAL WORK REQUEST PROCEDURE
              (FIXED PRICE/INDEFINITE
              DELIVERY, INDEFINITE QUANTITY)
 Defines Broad Areas
     in which the
   Contractor will be
       Tasked
 CONTRACT LEVEL
                             (FIXED PRICE OR
                             CEILING PRICE)
                    Defines the
                   Specific Task
             DELIVERY ORDER LEVEL
                                          (CEILING PRICE
                                              ONLY)
                                   Extension of
                                 Delivery Order for
                                  Repetitive or
                               Short-Duration Tasks
                             FORMAL WORK REQUEST
                                  SYSTEM LEVEL
TOSS User's Guide
August, 1991
39

-------
Section 1IL Delivery Order Lifecycle
                    EXHIBIT m-6



          FORMAL WORK REQUEST FORM
           FORMAL WORK REQUEST FORM
                          OQ/WfcMUMMb         tt§K I
              IPUCb HMI *V •OUHMVOi NIMOUOi RU
  Mill
       II lOtMOHMI M
40                     August, 1991           TOSS User's Guide

-------
                                         Initiation of Delivery Order
Step 3:  Complete a Labor Mix and Budget
      A labor mix and budget must be included in every DO package
as an attachment to the SOW. The labor mix is the DOPO's best
estimate of the contract staffing levels that will be required to complete
the work specifications. The budget includes estimates of staffing time
and resources needed to complete the work.

      In order to develop the labor mix, the DOFO should review the
work requirements and identify the contract labor categories that will
be used to fulfill the DO objectives. The budget is developed by
indicating both direct labor costs and other direct costs (ODCs). Direct
labor costs are the estimated hours and contract costs for each labor
category indicated in the labor mix.  ODCs are non-labor expenses
approved  for contractor use, such as copying, travel,  or computer
time. Depending on the contract type, limitations and fees may apply
to direct labor and ODCs.

      The budget for all TOSS Delivery Orders should include an
estimate for:

      •     Total Technical Labor

      •     Other Direct Costs (travel, training, equipment,
            software).

      To estimate  the costs associated with a proposed delivery
order, first determine the type of professional support required for
assignment completion. Reference Exhibit ffl-7 for a brief description
of the personnel skill categories and requirements specified under the
TOSS contract Section 73.6 (pages 44-92) of the SOW provides more
detailed descriptions of all labor categories.

      Once the type of labor required has been determined, estimate
the number of hours required by each labor category. Clerical hours
should not be included. Multiply the total number of hours for each
labor category by the rate per hour listed for the category. A list of
current CSC labor category rates can be found in Appendix E.  The
Total Technical Labor Amount is the sum of each technical labor
category added together.
TOSS User's Guide           August, 1991                        41

-------
Section HI: Delivery Order Lifecycle
      In addition to the Total Technical Labor amount, the budget
also needs to include an estimate of ODCs, which may be designated
as 'Travel and ODCs." If the ODCs exceed 10% of the total Delivery
Order amount, a written explanation of the costs needs to be provided
along with the budget. When determining the ODCs for a delivery
order, remember mat there are printing restrictions (reference Appen-
dix A - Section 7). The total value of the delivery order is the sum of
line items 1 and 2. Exhibit ffl-8 provides a sample TOSS budget and
labor mix
42                       August. 1991            TOSS User's Guide

-------
                                    Initiation of Delivery Order
                    EXHIBIT IH-7



               LABOR CATEGORIES
l':-*>p
Tide
Program Manager - 1
Assistant Program Manager - 1
Quality Assurance Coordinator
Site Manager - Level IV
Site Manager - Level m
Site Manager - Level n
Site Manager - Level I
Technical Project Leader
liCEMENT^UKiPOk'r^FOJSn
Basic Education Quals
4 -year degree
4 -year degree
4 -year degree
4 -year degree
4 -year degree
4 -year degree
4 -year degree
4 -year degree
IUNS'&V/|::::.
Experience
10 years
8 years
4 years
6 years
5 years
4 years
3 years
7 years
:'- ANALYSIS/PROGRAMMINGnDATABASBSUPPORTPOSrnONS
Tide
Senior Database Management
Systems Specialist
Database Management Systems
Specialist
Senior Computer Specialist
Computer Specialist
Senior Minicomputer Specialist
Mioocomputer apco&iist
OA/WP Specialist
Basic Education Quals
4 -year degree or Associates
in Computer Science
4 -year degree or Associates
in Computer Science
4 -year degree or Associates
in Computer Science
4 -year degree or Associates
in Computer Science
4 -year degree or Associates
in Computer Science
4 .year degree or Associates
in Computer Science
4 -year degree or Associates
in Computer Science
Experience
9 years
5 years
6 years
4 years
6 years
4 years
6 years

TOSS User's Guide
August ,1991
43

-------
Section III Delivery Order Lifecycle
                                             •run A az-9
                          TOMS (eoafd)
            Title
     Basic Education Quals
     Experience
 Senior Systems Analyst

 Systems Analyst


 Data Analyst

 Senior Programmer Analyst

 Programmer/ Analyst


 Senior Programmer


 Prugunumii


 Associate Programmer

 Programmer Technician


 KM Security Specialist
         4 -year degree

   4 -year degree or Associates
      in Computer Science

            N/A

         4-year degree

   4 -year degree or Associates
      in Computer Science

   4 -year degree or Associates
      in Computer Science

   4 -year degree or Associates
      in Computer Science
    Current attendance at an
      accredited university

            N/A
       9 years

       5 years


       lyear

       9 years

       5 years


       8 years


       4 years




        None


       4 years
' ^^ S^^^^^^^^^^^&^^^^^W TKt ff^4
Title
Caninr Vffomonmlum QrMwialict
9CIUUI MlwUgrdpniu JJJcUiUlal
Micrographics Specialist
Senior Technical Writer
Technical Writer
Senior WP Operator
WP Operator
md^.scH^;;!||igi:;*
Basic Education Quals


HS. diploma or equivalent
4 -year degree
4 -year degree
H.S. diploma or equivalent
H.S. diploma or equivalent
«^^tf;:-":'
Experience


2 years
5 years
3 years
3 years
lyea-
44
August, 1991
TOSS User's Guide

-------
                                                     Initiation of Delivery Order

' v*: * i&n^SMi^^'KiKB^I^Sin^l.^Ai^sn^iJ^ii'f^^^'^' "*~
i^^^^^^^^S^^^^^^!^^^t^^.^^^^^^^^^^^^^^&^^
Title
Senior Equipment Installation &
Logistical Support Technician
Equipment Installation &
Logistical Support Technician
Junior Equipment Installation &
Logistical Support Technician
Baste Education Quals
Associates Degree or
equivalent
Associates Degree or
equivalent
Associates Degree or
equivalent
Experience
8 years
6 years
4 years
X%^^&£^
" ff •' k '"¥, '** iv ?w <*X?i?Jwvi " • . .77. \fm jv x . .... , ~*. • JI..P . i w ^ •••>. • • . f. • . ^$?%\A.ffAvlfjVF,'llvt, • fA"1"..1,, , •
Title
Telecommunications
Management Analyst
Senior LAN Specialist
LAN Specialist
Telephone Service and
Equipment Specialist
Basic Education Quals
4 -year degree or equivalent
4 -year degree or equivalent
4 -year degree or equivalent
4 -year degree or equivalent
Experience
5 years
5 years '
3 years
4 years
f 'v'w.^ • -wx " :.*••• • . • •> •• •• '•?• •!** '^v • '•*<.&*• *i.".v •f.-Mfkf. •. •.. v . .' .f 	 { :. ^ . . •
• ^^.^^'^^^^^^^mK^^^^ffftyK^^^
Title
Operations Supervisor
Senior Computer Operator
Computer Operator
Junior Computer Operator
Data Entry Operator
Computer Disk/Tape Librarian
Senior Data Control Clerk
Data Control Clerk
Basic Education Quals
4 -year degree or Associates
in Computer Science
H5. diploma or equivalent
H5. diploma or equivalent
KS. diploma or equivalent
N/A
N/A
N/A
N/A
•.J4j™ v..^> .•v,.:
f^OT^W"'
Experience
8 years
5 years
-
-
lyear
1 year
5 years
3 years
TOSS User's Guide
45

-------
Section ID: Delivery Order Lifecycle
              Title
     Basic Education Quals
     Experience
 Senior Information Center
 Specialist
 Information Center Specialist
         4.year degree
         4-year degree
       5 years
       4 years
              Title
     Basic Education Quals
     Experience
 Senior Statistician
 Statistician
 Senior Science Specialist
 Science Specialist
 Senior Lab Automation Specialist
 Lab Automation Specialist
         4-year degree
         4 -year degree
         4 -year degree
         4-year degree
         4-year degree
         4 -year degree
       6 years
       3 years
       6 years
       4 years
       6 years
       4 years
m^mf*toOO&S^MAW&
Title
Senior Technical Information
Specialist
Technical Information Specialist

Document Abstractor
Document Indexer
Lead Information Processing
Specialist
Information Processing Specialist
Information Management
Specialist
Microfilm Equipment Operator
Microfilm Specialist
Document uintroi uern
Science Information Specialist
ZMElfft-SUPfOXtVQSXftOb
Basic Education Quals
4 -year degree or equivalent
4 -year degree or equivalent
.
4 -year degree
4 -year degree
N/A
N/A
4 -year degree or equivalent
N/A
I/A
n^> uip
-------
                                        Initiation of Delivery Order
                      EXHIBIT III-8
     EXAMPLE OF A LABOR MIX AND BUDGET
Keml. Technical Labor
                         Qutnttty
 Labor Cateqorlea          In Hours   x   Unit Coat   B   Amount
Examples
Senior Programmer/Analyst    	        $__•_      S
Systems Analyst            	             .            .
Data Analyst                	             .            .
Programmer                	             .            .
Technical Writer            	          	._       	._
                 Total Technical Labor
Hem 2.  EPA-Approved MIscellaneous/ODCs

                 Total Labor and ODCtt
Item 3. Program Support Labor (5.5%)
       (Hem 1 + Hem 2 x SJS% s Kern 3)
                 Total torthto Delivery Order
TOSS User's Guide            August, 1991                       47

-------
Section III: Delivery Order L/ecyc/e
Step 4:  Prepare Justifications


      It may be necessary to prepare justifications for the DO
package.  Justifications are assurances, stated in writing, that certain
conditions exist which allow for various activities to take place under
the delivery order. For example, if the Government only uses certain
types of hardware that may be required to complete a DO, then a
justification would highlight this and indicate  the need for the
Government to furnish the contractor with the hardware for their use.
When completed and signed as required, the justifications become
additional components of the .DO package. Three of  the most
frequent justifications are:

      •     Split funding justification

      •     Superfund justification

      •     7 Point Justification for Government Furnished
            Property (GFP).

These justifications are written in memo form. Examples of each can
be found in Appendix B.

      When a decision is made to fund a DO with more than one
appropriation, a justification for the funding allocation, or split, is
needed. The memo should identify each of the appropriations and
explain the methodology or ratio used for determining the allocation.
The justification memo must be approved by the Director of Financial
Management Division and submitted with the Procurement Request.

      Superfund justifications are required when Superfund monies
will be used to partially or fully fund a DO. The justification memo
should explain how the DO effort relates to, and is necessary for the
Superfund program, and indicate the ratio used to determine the
funding split. This memo is also used as documentation to support the
Procurement Request.

      The DOPO must prepare a 7 point justification for GFP when
the contractor is required to use government property to complete the
DO. Although only contract modifications formally authorize the use
of GFP, the justification is required to establish  the need for  a
contractortouseGFPtoaccomplishthetasksdescribedintheDO. The
DOPO should review the SOW task specifications to determine what
government property will be needed by the contractor. Appendix A


48                       August, 1991            TOSS User's Guide

-------
                                         Initiation of Delivery Order
provides further details needed to complete a seven point justification
for GEP. The justifications are reviewed by the PO, but only the CO can
approve a contractor's use of GFP.
Step 5:  Reference DO Checklist Prior to Submitting
         DO Package to PO
      The DOPO should assemble all material to be included in a
complete DO package. Check the material for inclusion of required
items and accurate information. Exhibit in- 9 contains a checklist of six
required components and four additional components that may also
be required, depending on the type of delivery order, to be included
in the package before sending it to the PO. The more thorough a check
conducted by the DOPO,  the easier the package can be reviewed.
Incomplete DO packages result in delaying the start  of work. If the
SOW is found to be incomplete or inadequate, it will  be returned to
you along with a completed 'TOSS SOW Review Checklist"  which
will indicate the deficiencies in the SOW. A sample 'TOSS SOW
Review Checklist" can be found in Appendix C.
Step 6:  Establish Delivery Order Files


      According to the FAR, subpart 4.801, executive agencies are
required to establish and maintain contract files for all contractual
actions. DOPOs must create their own filing system for all DO
activities prior to receiving a signed DO. The establishment of files
helps the DOPO become familiar with record keeping and determines
what documentation will be necessary to monitor the contractor's
performance. The following list includes suggested documentation to
be contained in the DO files:

      •     Copy of the delivery order and modifications

      •     Copy of approved Form 1900-65

      •     Copy of the contract and modifications

      •     Contractor's Project Plan, all revisions and drafts, and
            Project Plan approval form


TOSS User's Guide            August, 1991                       49

-------
Section UL Delivery Order Lifecyde
                     EXHIBIT III-9

 CHECKLIST OF ITEMS INCLUDED IN A DELIVERY
                  ORDER PACKAGE
                            :,; ^.^pJTK^^Cinii^^^^^&^.
    Form 1900-8, Procurement
    Request
  •  Form 1900-65, Designation
    of the Delivery Order
    Project Officer
  •  Administrator's screens for
    Prohibited and Vulnerable
    Activities
  •  Statement of non-
    duplication of effort


  •  Statement of Work


  •  Labor Mix and Budget
         Superfund Justification
         Split Funding Justification
      •  7-Point Justification for
         Government Furnished
         Property
         Rationale for Ceiling
         Price Delivery Order.
50
August ,1991
TOSS User's Guide

-------
                                          Initiation of Delivery Order
      •     Copies of deliverables and related correspondence

      •     Technical progress reports

      •     Financial progress reports

      •     Copies of invoices

      •     Government furnished property documentation

      •     Records of contractor meetings and phone calls

      •    - Correspondence

      •     Copy of evaluation of contractor's performance.

Further guidance for establishing a filing system can be found in the
FAR, subpart 4.803, (a) and (b). In addition, part of every filing system
should include a tracking system for milestones  and deliverables
which can be used as a monitoring tool. The forms contained in
Appendix C are one example of a deliverable tracking system. All files
and  documentation should be organized so that any individual
reviewing the file could determine the requirements and status of
current work being performed under the DO.
TOSS User's Guide            August, 1991                        51

-------
 PHASE 3.    MONITORING THE
                 DELIVERY ORDER
      There are five steps that support the monitoring and direction
of technical performance. They are:

      •    Approve contractor's Project Plan

      •    Communicate directly with contractor

      •    Review draft deliverable

      •    Monitor work through progress reports

      •    Communicate contractor performance problems.

The paragraphs below highlight the main points for each action.



Step 1:  Approve Contractor's Project Plan


      The first monitoring tool the DOPO should refer to is the
contractor's Project Plan.  The Project Plan is always the first task
 leliverable due. It explains how the contractor will accomplish the
 asks in the SOW, within the established timeframe and the estimated
Budget The DOPO should review the Project Plan to determine
ivhether the approach can successfully meet the DO'S objectives. By
comparing the Project Plan to the SOW the DOPO can also determine
the contractor's overall understanding of the assignment.

      It is important that DOPOs review the resumes of all proposed
CSC staff before accepting them.  Under the TOSS contract, the CO
and the PO only review the resumes of key personnel.  Therefore, in
order to ensure the most qualified support, DOPOs should review all
resumes and check to determine that the labor category requirements
are met regarding:

      •    Required level of education

      •    Adequate amount of experience


TOSS User's Guide           August, 1991                      53

-------
Section III: Delivery Order Lifecycle
      •     Necessary skills.

      The DOPO is required to complete a Project Plan Approval
Form similar to the one provided in Appendix C If the DOPO does
not approve of the contractor's approach, the DOPO should contact
the contractor to resolve the issues.  If the DOPO agrees with the
contractor's approach, the Project Plan becomes the accepted guide
for completing the taskrequirements. The DOPO should also identify
any changes that the contractor made from the SOW to the Project Plan
and prepare a modification to officially incorporate the changes into
the DO.
Step 2:  Communicate Directly with Contractor
         Throughout Life of DO
      A  second way to monitor contractor progress  is to
communicate directly with the contractor. This can be accomplished
through telephone conversations or face to face meetings. These
communications provide opportunity to identify changing
circumstances and ensure that both parties continue to understand the
strategy and outcomes of the task requirements. The DOPO can
clarify work specifications and reaffirm awareness to the contract
scope and limitations. While direct communication is necessary, it is
important that the DOPO not direct the contractor to perform work
outside the DO scope.
Step 3:  Review Draft Deliverables Within Specified
         Timeframe, Prior to Final Version
      Reviewing draft and intermediate versions of deliverables is an
important means for monitoring contractor performance. The DOPO
should comment on reports prior to receiving a final version. This
ensures mat a desired product will be produced. DOPOs should
review drafts within the specified time frame stated in the SOW in
order toobtain thermal producton time. It is also useful to incorporate
sufficient EPA  review  time into modifications that revise  the
deliverable schedule.
54                       August, 1991            TOSS User's Guide

-------
                                      Monitoring the Delivery Order
Step 4:  Monitor Performance Through Monthly
         Progress Reports
      Contractor performance should  also be  monitored by
reviewing monthly progress reports. The contractor's written
progress provides a picture of work performed under a DO. Progress
reports generally contain information provided by  the contractor
about work completed during the current period, work planned for
the following period and significant issues or problems.  An example
of a completed progress report can be found in Exhibit HMO. Progress
reports confirm timeliness of deliverable progress  and  ensure
performance is within the DO scope and budget. Whenever the DOPO
identifies possible problems, clarification should be obtained from the
contractor.

      Progress reports play a key role in the TOSS contract for the
following reasons:

      •     Progress reports ensure that deliverables have been
            developed and presented in a timely and satisfactory
            manor

      •     Progress reports bring to the attention of the DOPO
            and other EPA contract management staff any
            problems or issues of concern which may have arisen
            during the reporting period

      •     Progress reports assist the DOPO in the evaluation of
            contractor performance at the dose of the Delivery
            Order

      •     Progress reports are an acceptable vehicle  for
            indicating changes in staff mix or labor hours.

      Additionally, under the TOSS contract the DOPO is authorized
to approve modifications in  the staff mix within the original delivery
order direct labor budget without submission of a formal modification
request to the PO and CO. Documentation of the modification and
approval of the staff mix is provided through regular progress reports.
For example, the number of hours for a computer programmer could
be increased while reducing the number of research hours in order to
perform the work effectively, as long as the changes don't affect the
total direct labor budget
TOSS User's Guide            August, 1931                       55

-------
Section Of: Delivery Order Lifecycle
                             EXHIBIT 111-10

                         PROGRESS REPORT
                                                  EPA Nuaaer:  0343-C82
        Delivery Order Number:   0043-0

        delivery Order Title:    OWE Support  for  Superfund Systems

        EPA Project Officer:

        CSC Operations Director:

        CSC Department Manager:

        Reporting Period;	5/1/91 7 5/31/91	


        AMTBACT

        The purpose of   this Delivery  Order  is  to provide  OHPE  with ADP
        technical support   for  the continued development and enhancement
        of Cerclis and ZNSITE.  as will as  to continue the implementation
        and support of integrated office systems for OHPE.
        o    Converted and ran April 1991 data and reports.

        o    Delivered Xnsite reports to EPA.

        o    Transmitted March 1991 Znsite data files to EPA.

        o    Continued enhancement of the programs and procedures.
            Exchange of information at  NMI biweekly techncial meetings.

               /Mutzon

            None



        o    Conversion and delivery of the  April  1991  CERCLIS  data  and
            reports.

        o    Continued maintenance and enhancement to the Xnsite program*.
        n&rrtve aiu

                           CATEGORY                t Or TTwr ON THIS 00

                           Assistant Program Manager           4
                           Senior word  Processing  Op.          2
                           Senior Technical  Writer            9
                           Technical Writer                    i
                           Senior LAN Specialist              43
                           Sr. Systems  Analyst                24
        See Attachment A

        CUSlff ZCUZOV fOU

        notification af eh«na«« - with respect to delivery order 0043-082
        there were no changes of the type subject to the Notification of
        Changes prevision of the  contract during the period covered by the
        progress report.

        T»ennie«i Biraecian - with respect to delivery order no. 0043-082
        the OOPO has not  issued technical  direction during the  period
        covered by this progress report.

                                 August, 1991               TOSS User's Guide

-------
                                      Monitoring the Delivery Order
Step 5: Communicate Contractor Performance Problems


      On occasion, contractor performance problems may develop
during the course of the DO. The DOFO should address minor issues
directly with the contractor, such as questions regarding progress
reports, e.g., inadequate documentation of an issue. For more serious
matters, such as the failure by the contractor to produce deliverables,
the DOPO must communicate the situation to the PO. Attempts to
negotiate solutions to serious matters with the contractor may forfeit
EPA's legal rights. If there is a problem, an evaluation form similar to
the one presented in Appendix C provides needed documentation so
that the PO or CO can determine the extent or consequences of the
situation, and what negotiations or sanctions should be exercised.
TOSS User's Guide            August, 1991                       57

-------
PHASE 4.    INITIATION OF
                 MODIFICATIONS
      The fourth phase of the DO lifecycle is the initiation of
modifications.  When initiating modifications to the SOW, the
following steps must be followed:
      •    Review DO parameters
      •    Monitor contractor performance
      •    Propose SOW changes
      •    Prepare modification request memo
      •    Submit modification package to DO
      •    Incorporate changes after modification request is
           signed.
The section below describes the steps which will result in an official
change to-the SOW.

Stepl:  Review DO Parameters
      Upon receiving requests to modify an approved delivery
order, the DOPO must review the DO'S parameters. Parameters to be
considered are:
      •    Period of performance (POP)
      •    Deliverable due dates
      •    Budgets
      •    GFP.
      These parameters establish contractual limits in which the DO
work can take place. DOPOs must ensure work is performed within
these  contractually binding guidelines. Occasionally, however, a
TOSS User's Guide           August.1991                      59

-------
Section ni: Delivery Order Ufecycle
parameter may limit effective performance. The DOPO, for example,
may decide that the products would be higher quality if a two-week
EPA draft review was built into the deliverable schedule prior to
submission of a final deliverable. A formal change to the parameter
should occur to accommodate current conditions and revise the due
dates on the deliverable schedule.
Step 2:  Propose Official Changes to SOW Through a
         Modification
      As indicated above,  awareness of parameters and dose
monitoring of contractor performance may reveal the need to change
a SOW during the life of a project. Changes are made official through
a modification document signed by the CO. Modifications begin as
written requests to the PO to incorporate changes. Various types of
modifications exist to meet the changing needs of a project. There are
separate ways to prepare each type of request. Exhibit ffl-11 indicates
the most common types of modifications requested. Close monitoring
by  the DOPO will allow paperwork to be easily generated  and
submitted for processing early enough to avoid delaying work.

      In  addition to reviewing the DO'S parameters, the DOPO
should also monitor overall project direction and anticipate any future
requirements. The DOPO can anticipate when the SOW may need to
be changed, by routinely communicating with the contractor,
identifying situations in the program office effecting the DO tasks, and
reviewing deliverables or progress reports. For example, if it becomes
necessary to expand a task due to complexities that developed during
performance, the task description should be revised to document
what is required of the contractor. The earlier the DOPO identifies a
possible need to change the SOW, the more efficiently changes can be
formally initiated.
60                       August, 1991            TOSS User's Guide

-------
                                   Initiation of Modifications
                  EXHIBIT in-11



   FREQUENTLY REQUESTED MODIFICATIONS
i$tt«*;^;M:« S'W
> s^**W| j^'Mf fSfi- "ST
kBQtiimEft
Alter POP
Revise
SOW
Revise
deliverables
schedule
Change
Accounting
Data
Change in
Designated
DOPO


Deobligate
or add
funding
Change
budget
Sjfcs •.•^^..••••\-*^-^-.i^

SiOBSTC&tHe;
Justify modification
of POT
Add, delete or
modify
requirements
Update deliverable
due dates or
changes in quantity,
ship to, etc.
Change the
accounts that fund
the DO
Replace DOPO
assigned to DO


Change the amount
of money obligated
to a ceiling level DO
Shift hours between
labor categories or
revise ODC ceilings
*S«fe .^L ' .*^-^*g{iaW

flii^lj^Oluc^^l^P
• Memo
• New task
descriptions
• Memo
• New schedule
or milestone
table
• Memo
• Memo
• Justifications
• Memo
• Form 190045


• Memo
• Revised budget
• Form 19004
• Memo
• Revised budget
$$$&%iMI$^&iS&^~
^^w^^^u^^^^y^^^^y^.v'^Tx^ "£
^MQrtTOMfNTS-^
• Identify old POP
end date as well as
revised end date
• Number of tasks
added in sequential
order
• Identify task #s and
names to be deleted
• If task added in
middle, renumber
subsequent tasks
• Identify task name
• Identify deliverable
name
• Identify new due
date

• Obtain appropriate
signature
• DOPOs not meeting
training
request a waiver or
interim cenuicanon
• obtain appropnate
signature
• Total authorized
amount of DO does
not change
TOSS User's Guide
August. 1991
61

-------
Section III: Delivery Order lifecycle
Step 3:  Prepare Modification Request Memo


      When the DOPO identifies the need to change the DO and
determines a modification is necessary, paperwork should be
initiated to officially incorporate'the changes to the SOW. The actual
modification request is usually prepared in the form of a memo. For
example, the memo should include the DO number and explain the
need for the modification and indicate how the SOW will change.
An example of a modification request memo can be found in Exhibit
m-12. Some types of modifications require the DOPO to complete
other paperwork in addition to the request memo. The table in Exhibit
m-11 lists attachments or forms needed for each modification type.
All paperwork must be completed prior to submitting the package to
the PO and CO for review and approval.
 Step 4:  Submit Modification Request Package to
         Contract Management Team (CMT) for
         Review Prior to Incorporating Changes


      After the paperwork has been completed and checked for
accuracy, the modification is ready to be submitted for review.
Request packages should be forwarded to the CMT before the changes
are needed, so that work 'progress  is not de'.-ved while the
modification is being signed. Request packages are reviewed for
completeness and accuracy of information and calculations. When the
CO reviews the modification package and determines it satisfactory,
the modification is executed. Therearetwotypesof modifications that
the CO can issue: unilateral or bilateral. Unilateral modifications can
be signed by the CO, without the contractor's consent, while bilateral
modifications require the contractor's consent and signature before
the CO can give approval. Regardless of the modification type, the
proposed changes are not official until a modification has been
approved.
62                      August, 1991           TOSS User's Guide

-------
                                                         Initiation of Modifications
                               EXHIBIT 111-12

                  MODinCATION REQUEST MEMO
              umrreo STATES ENVIRONMENTAL PROTECTION AQENCV
                           WASHINGTON. O.C. 20460
                               JUN | 0 1391

  MEMORANDUM


  SUBJECT: Modif-ication to Work Assignment 020. Contract 6S-WO-J3043

  FROM:    Don r-anklin. Delivery Order Manager
                       .                                u
          Office of Federal Facilities  Enforcement (DE 2261)
  TO:      Brenda Oaly
          Project Officer

       Request modification of the  Statement of Work (SOW) associated with
  Delivery Order 020 of Contract  No. 6B-WO-0043. with Computer Sciences
  Corporation, as follows:

       Amend the third paragraph  of item 7. GOVERNMENT FURNISHED EQUIPMENT  to
  read:

       ' EPA shall provide,  either  directly or through an authorized contractor
  purchase agreement, a high performance pc and appropriate supporting hardware
  to be used in developing the  software programming  for FFTS.  The contractor  '
  snail furnish suitable Mclntosh equipment, supporting wordprocessing and
  graphics software and laser  printers, for production of the A- 106 report."

       It is in me best interest of the Government  to allow the Contractor to
  purchase the eeuipment on  behalf of the government with direct cost to the
  contract since the  equipment will continue to be used by the Office of Federal
  Facilities Enforcement.

      If you have  any  questions relative to this request, please contact me on
  382-5908.
TOSS User's Guide                August, 1991                                63

-------
Section Ul: Delivery Order Lifecycle
Step 5: Notify Contractor of Changes to the SOW


      Contractors do not have the authority to perform the changes
to the SOW and cannot begin any new work until a modification is
approved by the PO and CO. Modifications being reviewed by the
PO or CO do not represent formal approval. Contractors must await
formal notification by the DOPO that the DO modification has been
executed by the CO before performing the SOW as changed.
64                       August, 1991            TOSS User's Guide

-------
PHASE 5.    MONITORING
                 AND APPROVING
                 EXPENDITURES
      The fifth phase of the delivery order lifecyde is the monitoring
and approving of expenditures. The DOPO should take the following
two steps:

      •    Examine monthly invoices to ensure accuracy

      •    Adhere to the Prompt Payment Act.

The key components of this phase are described below.



Step 1: Examine Monthly Invoices to Ensure Accuracy
      The contractor is required to submit monthly invoices in
accordance with contract requirements. The DOPO must carefully
review invoices to ensure that contractor funds are spent for the
purposes for which they were intended. DOPOs should examine the
following items on all invoices:

      •    Contract and delivery order numbers

      •    Period of performance compared to the period of
           incurred costs

      •    Personnel billing to the delivery order — the labor
           category, rates and ceilings

      •    Other direct costs compared to the SOW and Project
           Plan, e.g. travel, training and equipment

      •    Correct arithmetic.

The DOPO should accept the invoice if charges appear reasonable,
correspond to the work performed, and the work quality is acceptable.
If unreasonable charges appear on the invoice, the items in question
should be disapproved for payment. The DOPO should also seek
clarification from the contractor, and as necessary, back-up data be
provided.

TOSS User's Guide           August, 1991                      65

-------
Section III: Delivery Order Lifecycle
Step 2 Adhere to Prompt Payment Act for Paying
        Contractors
      According to the Prompt Payment Act as described in FAR
52.232-25, the Government is required to make invoice payments to
the contractor within 30 days of when the billing office receives a
proper invoice, or after the Government has  accepted supplies or
services from the contractor.  After the 30 day timeframe,  the
Government must begin payinginterestonanyunpaidinvoices. In an
effort to promote efficient invoice processing, DOFOs are normally
required to approve or disapprove an invoice within five days after
receiving a copy. In an effort to comply with the timeframe, DOPOs
should first disapprove questionable charges and then attempt to
'resolve the problems with the contractor. Once the the DOPO receives
the invoice approval/disapproval recommendation, the DOPO
notifies the payment office to pay the contractor.
66                       August. 1991           TOSS User's Guide

-------
PHASE 6.    DELIVERY ORDER
                 CLOSE-OUT
      The final phase of the lifecyde is the Delivery Order Closc-Out.
Functions to be performed in this phase include the following six
steps:

      •    Deobligate unused funding

      •   ' Evaluate contractor performance

      •    ' Identify location of deliverable

      •    Review final invoice

      •    Retain DO file

      •    Account for Government-furnished property (GFP).

The following sections describe these steps.
Step 1:  Deobligate Unused Funding Through
         Modification
      Upon completion of the DO, the DOPO should review all costs
incurred by the contractor.  When contractor costs are less than the
total DO funding, determine whether to initiate a modification to
remove or deobligate the unused monies.  Phase 4 of the delivery
order life-cycle also provides direction on preparing modifications.
The DO type indicates whether to deobligate any remaining funds.
Unused funding should be deobligated through a modification from
a ceiling-priced DO because the contractor is only paid up to the
amount expended. Unused funding cannot be deobligated from a
f wed price DO, because the contractor is guaranteed to receive a fixed
payment regardless of whether the costs incurred were less than the
total DO funding obligation. Refer to Phase 1 for additional guidance
on TOSS DO pricing arrangements.
TOSS User's Guide           August, 1991                       67

-------
 Section III: Delivery Order Lifecycle
Step 2:  Evaluate Contractor Performance
      After the contractor has submitted all required deliverables,
the DOPO is usually required to evaluate the contractor's overall
performance. Acceptable performance ratings are usually taken as an
indication mat the final invoice will be approved.  DOPOs will
normally be required to complete a contractor evaluation form,
similar to the one contained in Appendix C. Such a form, which is
submitted to the PO, helps provide information about a contractor's
strengths and weaknesses that may be required for future solicitations
or proposal evaluation.
Step 3:  Identify Through Memo the Organization
         Maintaining or I"-ing Deliverables
      Qoseout procedures include the need to indicate which EPA
organization will maintain or use the deliverables. The deliverables
can refer to items in the form of a report, or to services provided and
the location of performance. The DOPO may be requested to prepare
a memo, submitted with the contractor evaluation  form  which
documents where task deliverables can be found.
Step 4:  Review Final Invoice for Payment


      When the deliverables have been accepted, the DOPO will
receive a final invoice for the services rendered.  If the DOPO
determines that  the contractor's performance is satisfactory, the
invoice should be paid in full. Final payment signifies the end of the
contractor's obligation.
68                       August, 1991            TOSS User's Guide

-------
                                         Delivery Order Close-Out
Step 5:  Retain DO Records for Auditing Purposes
      Upon DO completion, the DOPO shall retain DO files. Files
should not only be retained for audit purposes, but also for possible
Congressional inquiries, or questions that may arise from the PO, CO,
or oversight groups. DO  records  are  part of the necessary
documentation for a complete contract file and can establish what
products were received for the services procured. Although it may
differ for every contract, the FAR subpart 4.805 describes the retention
periods required for various documentation contained in a contract
file.
Step 6:  Account for Government-Furnished Property
      Upon completion of the DO, the DOPO should be aware that
the contractor will be required to perform an inventory of all residual
expendable and non-expendable government furnished or contractor
acquired property during the life of the DO.  The contractor is also
responsible for reporting the  findings  of their  inventory to  the
Property Administrator, Contracting Officer and Project Officer by
using EPA'Form 1730-1, "Report of Non-Expendable Government
Property Acquired by the Contractor," and EPA  Form 1700-7,
"Property  Receipt and Transfer."  More details concerning  the
inventory and accounting for GFP can be found in EPA's Contractor's
Guide for Control of Government Property.
TOSS User's Guide            August, 1991                       69

-------
                    INDEX
Contract Management Officials —14
Contract Management
    Technician (CMD	62
Contract Management	3-9
Contracting Officer	5
Contractor Performance	55,68
Delivery Order
    Checklist.'......	50
    dose-out....	67-69
    Files	49,51
    Initiation................................31-51
    Package..-	50

    Services & Products Needed ...23
Delivery Order Lifecyde	21-69
Delivery Order Project Officer ....9-10
Designation and Appointment of
    Delivery Order Project Officer
    (See Form 1900-65)
Direct Labor Costs	41
EPA Contract Management
    IVulilUcU •••••••••••••••••••••••••••••••••••••• /f w
FAR	3,5,49,51,66
Form 1900-8	29,31,32
Form 190045	31,32,49,50
Formal Work Request
    Procedure	33,38-40
Funding....................................... 25-26
Labor Mix & Budget	41-42,47,50
Labor Categories	42,43-47
Mission Support............................... 24
        Modification Request Memo	63
        Modifications —	59-64,67

            Unilateral.................................... 62
        Monthly Invoices		65-66,68
        Non-Duplication of Effort	24,50
        Non-Severable Services—	-	25
        Other Direct Costs, (ODCs)	41
        Planning Procurement Request
            (See Form 1900-8)
        Pricing Arrangements	27-28
            Ceiling Price	27-28
            Fixed Price	27-28
        Progress Reports	55-56
        Prohibited Activities	33
        Project Officer	-	7"
        Project Plan	49,53-54
        Prompt Payment Act	66
        Seven-point justification	48,50
        Severable Services	25
        Split Funding Justification	48
        Statement of Work
            (SOW)	33-38,50,59-60
        Superfund Justification		48
        TOSS Contract.......................... i, 13-19
            Contract Operating Sites	19
            Contract Value........	14
            Period of Performance	14
            Purpose -.......—....................... 15
            Scope of Work........................... 15
        Total Quality Management	21
TOSS User's Guide
August, 1991
71

-------
       GLOSSARY
bilateral modification - modifications, such as those which may
necessitate substantive changes to a contract, which require
agreement or approval by both the contractor and CO before
becomming fully executed pg.62.

budget - estimates of staffing time and resources required to complete
work specifications pg-41.

ceiling price delivery order - a type of delivery order pricing
arrangement under which the government pays for all contractor
costs up to an allowable amount and delivery order task specifications
can not be dearly defined pg. 27.

Contract Officer (CO) - individual designated with authority to enter
into, administer, and/or terminate contracts for the Government and
make related determinations and findings (FAR 1.602) pg. 5.

contract - "a mutually binding legal relationship obligating the seller
to furnish supplies or services and the buyer to pay for them." (FAR
2.101) pg. 3.

deliverables • the actual products or services, such  as reports and
hardware maintenance, mat are produced by the contractor, and
turned over to the agency as indicated in a statement of work pg. 54.

Delivery  Order Project Officer (DOPO) - individual serving as the
primary Agency contact for technical performance of the delivery
order and is in direct  contact with the contractor during the
performance period and ensures that quality products are delivered.
P8-9-

delivery order - "an order for supplies or services placed against an
established contract or with Government sources of  supply" (FAR
13.101) pg. 23.
TOSS User's Guide          August, 1991                    73

-------
Glossary
delivery order lifecycle • a breakdown of delivery order management
into six sequentialphases identified herein as delivery order planning,
initiation of delivery order, monitoring the delivery order, initiation of
modifications, monitoring and approving expenditures, and delivery
order close-out pg. 21.

delivery order package - completed  documentation required for
submission and review by the PO and  CO before formal approval is
given for the contractor to begin providing products or services as
detailed in a statement of work pg. 49.

delivery order parameters • contractual limits in which the delivery
order work can take place pg. 59.

Designation and Appointment ofDOPO/Form 1900-65 - a required
form used for nominating individuals  to the position of DOPO and
alternate DOPO for each new delivery  order pg. 32.

direct labor costs - estimated hours and contract costs for each labor
category indicated in a labor mix pg. 41.

EPA Contract Management Manual  -  an EPA internal guidance
document which provides material on procedures, definitions, and
methodology relating to procurement activities pg. 7.

FAR (Federal Acquisition Regulation) - a  reference volume which
provides uniform policies and  procedures for  acquisitions by
executive agencies of the federal government pg. 3.

fixed price  delivery order - a type of  delivery  order pricing
arrangement under which the government must pay a set pnce for
products or  services regardless of the contractor's actual costs and
delivery order task specifications can be dearly defined pg. 27.

FP/IDIQ (fixed price/indefinite delivery, indefinite quantity) contract
- a type of contract in which the government pays a set price for a
service, regardless of the contractor's cost, but no set amount of
products or services to be furnished by the contractor is listed, except
for a minimum government order pg.  1.

formal work request - a procedure for extending  a delivery order
when work can not be adequately  described at the task level,
particularly for repetative, short duration services  pg. 33.
74                        August, 1991            TOSS User's Guide

-------
                                                       Glossary
interim certification - authority .given to individuals to act in the
capacity of DOPO, prior to DOPO certification, when they are enrolled
in contract administration training to receive certification pg. 32.

justification - an assurance that certain conditions exist which allow
for various activities to take place under a delivery order pg. 48.

labor mix - an estimate of contract staffing levels that will be required
to complete work specifications pg. 41.

modification - an official change to the statement of work pg. 60.

monthly invoices - reports provided by the contractor to the Agency
on the same date each month, which indicate contractor costs incurred
on each delivery order for a specified timeframe pg. 65.

mulitple appropriations - funding a delivery order with more than
one financial source pg. 26.

non-duplication of effort - a written statement indicating that no other
work efforts exist that would duplicate or contradict the intentions of
the proposed services and /or products pg. 24.

non-severable services - work that if interrupted would deny EPA of
an end product or completed service critical to program mission pg.
25.

other direct costs  (ODCs) - non-labor expenses  approved  for
contractor use, such as copying, travel, or computer time pg. 41.

period of performance - timeframe in which work takes place under a
delivery order, usually beginning the date the CO gives approval,
until the last deliverable is due pg. 59.

Procurement Request/form 1900-8 - a  required form used  for
procuring products or services which indicates what items are being
procured, their cost, and corresponding accounting data pg. 29.

progress reports - written descriptions provided by contractor which
indicate work completed or planned on a delivery order during a
given timeframe, along with any outstanding issues for the Agency to
consider pg. 55.
TOSS User's Guide            August, 1991                        75

-------
Glossary
prohibited activities.- services or work which are considered
inappropriate for contractors to perform, particularly in the area of
policy decision-making, as indicated in Administrator's  Reiley's
memo (Exhibit A-l) pg. 33.

Project Officer (PO) - individual serving a central role in ensuring
effective contract management and is  the  primary1 source  of
information and contact with the Delivery Order Project Officer pg. 7.

Project Plan  -  a  written report produced by the contractor
documenting how the tasks will be accomplished in the statement of
work, within the established timeframe and the estimated budget pg.
53.

Prompt Payment Act • the Government is required to make invoice
payments to the contractor within 30 days of when the billing office
receives a proper invoice, or after the Government has accepted
supplies or services from the contractor (FAR 52.232-25) pg. 66.

scope of work - the array of services or  products that are being
procured by an Agency, which are specified in either the contract or
delivery order pg. 33.

Seven point justification for Government furnished Property (GFP)
- a  written statement covering seven points which support the
contractor's need to use GFP to complete the delivery order  pg. 48.

severable services - work that can be interrupted without affecting the
overall program mission or specific purposes of the delivery order pg.
25.

split funding justification - a writter  ^atement explaining how and
why a deli very order will be funded \v. Ji more than one appropriation
pg.48.

statement of work - a written description that describes the services or
products required from the contractor and indicates when they are to
be provided pg. 33.

Superfund justification - a written statement explaining how and why
a delivery order will be funded either partiallyor fully withSuperfund
monies pg.48.
76                        August, 1991            TOSS User's Guide

-------
                                                       Glossary
task (descriptions/specifications) - a detailed statement outlining a
single work effort to be performed by the contractor such as drafting
a report pg-33.

technical  labor - professional or non-clerical contractor support
required for assignment completion pg. 41.

unilateral modification- • modifications, such as those that may direct
an administrative change, which only require approval by the CO
before becomming fully executed pg. 62.

waiver - authority given to individuals to function as a DOPO and
exempt them .from contract administration training pg. 32.
TOSS User's Guide            August, 1991                        77

-------
   APPENDIX  A
          CONTRACT
MANAGEMENT ISSUES
      AND CONCERNS
    There are many important contracts management issues and
concerns that DOPOs need to be aware of to ensure that both the
Government and the contractor are following appropriate and*
required policies and procedures. Appendix A summarizes these
issues and concerns and describes applicable EPA and contractor
responsibilities, authorities, and requirements. Appendix A contains
information regarding:
    •   Prohibited Use of Contract Services
    •   Personal Service Contacts
    •   Conflict of Interest
    •   Subcontracting and Consulting Limitations
    •   Technical Direction
    •   Travel, Conferences, and Training
    •   Publications and Printing
    •   Government Furnished Property
    •   Inspection and Acceptance.
TOSS User's Guide        August, 1991               A-l

-------
      1.    PROHIBITED USE OF
            CONTRACT SERVICES
      On April 17,1990, EPA Administrator William Reilly issued an
Agency-wide memorandum that discussed several new  policies
regarding EPA's use of contractor support:

      •     All EPA managers must include in their performance
            standards a requirement emphasizing contracting
            controls. This is designed to improve contract
            management effectiveness and ensure greater
            accountability at senior management levels.

      •     Certain activities are considered inappropriate for
            contractors to perform, and their incorporation into
            all future Agency contracts and subcontracts is
            therefore, prohibited. These activities are listed in the
            checklist shown in Exhibit A-l, which must be
            completed by the DOPO as part of every Delivery
            Order package.

      •     DOPOs need to be aware of certain "sensitive"
            activities that may place EPA in positions of
            vulnerability if performed by contractor personnel.
            These activities, which are listed in Exhibit A-2, are
            not activities from which contractor involvement is
            precluded, but are ones wherein EPA should exercise
            control in contracting for them. The policy requires
            that, prior to procuring support in any of these areas,
            adequate control measures must be established to
            ensure a final Agency product that is unbiased and
            represents Agency thinking. Therefore, DOPOs are
            required to complete the checklist in Exhibit A-2,
            indicating whether these activities will occur in their
            Delivery Orders and providing justification for those
            that will.

      By completing the checklists shown in Exhibits A-l and A-2,
internal controls  will be established to ensure that inappropriate
contractor activities are not performed.
TOSS User's Guide            August,1991                      A-3

-------
 Appendix A




                             EXHIBIT A-l


  PROHIBITED CONTRACTING ACTIVITIES AT EPA


                     Prohibited Contracting AetMtlM at EPA
 A« a DoDviiy Offer Prajaci Officer, you irvtxp^                            Raad
 each Kern and cheek • yes or No to Indent whether your order allows for the activity.

  1. Tht actual preparation of Congressional testimony                     Y«<  j NX >

  i Th«im«fv<«wlngorhln^eflntfviduiJ»JDr«fnp(oyn»«ni«lEPA            ¥•()*()

• 3. Developing and/or wrtttng Position Descriptions and Performance          v«(  ) r*( >
    Standards

  4. The actual determination of Agency poBcy                             v«(  > N»< )

  5. Psrttdpating as svotngmernber on a Performance Evaluation Board:      v«(  ) N»( )
    partttipation In and/or attending Award Fee meetings

  6. Preparing Award Fee Miters, even under typing eervicM commas         Y«<  ) »( )

  7. The actual preparation of Award Fee Flam                            v«<  ) r«( )

  ft The preparatJon of documents en EPA letterhead other than routine        Y«(  >
    •dmintstrative
  ft Reviewing vouchers end Invoices for the purposes of determining          Y«(  )
    whether cost, hours, and work performed are reasonable

 10. The development of Statements of Work. Work Assignments. Technical     v«(  )
    Direction Documents. Delivery Orders, or any other work issuance
    document under a curved thai Hie contractor Is performing or may perform

 11. On eehalt of EPA, ectuafly preparing ruponm to audHngort»^m the    Y«<  >
    Inspector General, General Accounting Office, or other auttting entities

 12. On behalf of EPA, acbjaty preparing responses to CongresstonaJ          VMI  >
 13. The actual preparation el responses ta Freedom of mformatton Act          v«i )>*>()
    reojuests. other than nudnOi non^udgmental oorrespondence bi el
         , EPA must aignft
 AM  A ^H* AA^^k^H^^ ^^^|^^^ ^ka ^a»A^S^k^h» ^ ^ft^h^kft^^k^^k^k* 0^ ^^k^k^^k^^^^ iB^k^kM ^kA Baft A flUfe      V^M I I
 14.  Ally COnBMI WUCn mtOJOnUm m W§^^CiPfw Wpl^iWniWPIOaBrAw      VBBI ]

     OUtHOe) P8flav0


 A •  ^e>^k^k^e> ^^aaA^ ^k^t^_|MM^k^^^^ke>^& §^A^afla>^aai                                  Vflai f I
 la.  conoucong aonwesBBflvv neBmeje                                  *^* >
 A-t                            August, 1991               TOSS User's Guide

-------
                                               Prohibited Use of Contrtact Services
                                EXHIBIT A-2


         ACTIVITIES OF POTENTIAL VULNERABILITY
                      Activities of  Potential  Vulnerability
                        /A.
The Mewing activities very often require contractor involvement In  programs that are
dtpondim upon oontmctor support to accomplish tholr mission. Thoto aoivfoes may mmi in
tho Improper UM of contractors H Intamal controls to onaura prepor ovoraight havo not been
established. They may also load to tho poreoption that inherent Government functions havt
boon sasignod to contractor!. Whonovor contraflow ara uaod to portorm these tasks. Agoncy
employees must play an active role In ovorsooing tho offort and making all final decisions. This
requires doss monitoring to ensure that final outputs reflect tho Agency's positions, thoughts,
and
For each Hem. check a Yes or No to Indceto whether these activities win occur under your
Delivery Order. If yes. please attach an explanation or Justification for each Item.

 1.  Budget preparation support Including workload modeling, fact-finding.     v«(  j  N»(  j
    efficiency studios. shoukMost analyses, etc.

 2.  Reorganization and planning support                                Y«(  >  NB(  >
 3. Support services such as analyses, fesslbnity studies, etc. to be used      v«u  )  NB(
   by EPA personnel in developing policy
 4. Regulation development support

 5. Any support In the In-house evaluation of another contractor's performance

 6. involvement In strategic acquisition planning                          Y«(  )  NX

 7. Support en Improving contract management                          veil  )  NX

 6. Piuvidng spedabed expertise In the contractor selections process       VM(  )  NX

 9. Souations where contracare ehare office space with EPA employees      «•(  >  ND(
• Jk O^^^K^^BAA MAA^^^BM^^ei AMM^nflBeAA IM AA^A je^kft^okldM^oieAflkS) jwf fie)MAAH^ek>Ma>k jhJ       M^^J t  B^A»I
iQ. ProviQing speoaozeo expenxw HI me oweiopmeni or sHemern 01       *•( i  NH
11. Suppoit In preparing rasponsei to Freedom of Information Act requests    Yei( )  M»(
12. Any sfcjsikwwfierstaacortracbxhas access to Cortdenttal            vmt ) NX
   Basif^ttiTforiMdonandy^anyethefMfMttveiiifofmation
   Anyiupoortt^clvingEPApoleyefreouiatofyimerpretsiteasuehas       «•()*()
   staffing heslnfls. aasndlng conferences en behalf of EPA,
   communty nlaloni efiafts. oondurtng EPA training r  ~
14. Ariysitusflwi where lean NassuinedthattnecewtnKtor Is « PA.          YM< j NX »
         i specracafly identtlvlng tart as a i
18. lirtepsndanfjy mterpretng EPA acteloa Of regutattom on BPAls .         «•( )  NX )
      TOSS User's Guide               August.1991

-------
      2.    PERSONAL SERVICE
            CONTRACTS
      A personal services contract results when the Government
assumes the right to instruct, supervise or control a contractor's
employee in how that employee performs his or her work. It is the
contractor's right to hire and fire the contractor's employees, and to
assign and organize the contracted-for work.

      In drafting statements of work for Delivery Orders, DOPOs
must take care to avoid creating a Delivery Order that creates an
employer/employee relationship between the Government and the
contractor's employee.  This is particularly a  problem where the
contractor's employees are working on-site with EPA personnel.
Personal services are illegal and must be avoided in all situations.

      While there are no definite rules for characterizing particular
services as  "personal" certain indicators warrant  further
investigation. The following bullets represent areas where the DOPO
should exercise caution and sensitivity to ensure that no personal
services are provided:

      •     Contractor performance is required on site

      •     Government provides principal tools and equipment
            not under a 7 point justification

      •     Services are applied directly to the integral effort of
            EPA or an organizational subpart  to further its
            assigned function or mission which are not contained
            in the contract's SOW
               *•
      •     Comparable services are performed in the same or
            similar agencies using civil service personnel or labor
            categories not contained in the contract

      •     The need for the type of service can reasonably be
            expected to last beyond one year
TOSS User's Guide            August.1991                      A-7

-------
ApepndixA
      •     The inherent nature of the service, or the manner in
            which it is provided, reasonably requires, directly or
            indirectly, Government direction or supervision of
            contract employees.

      All of these elements do not have to be present to have a service
deemed personal and thus illegal. The most important element to be
avoided is the supervision of contractor employees by Government
personnel.

      Personal services are more likely to occur when the contractor
has not received clear direction in the initial SOW: The DOFO can
avoid this situation by writing dear and effective SOWs.
A-8                       August. 1991            TOSS User's Guide

-------
      3.    CONFLICT OF INTEREST
      In preparing statements of work, EPA staff must take into
account the possibility of organizational or individual conflicts of
interest

      Organizational conflicts of interest are situations that occur
from time to.time with respect to EPA contracts. It is always preferable
to prevent such conflicts from arising during contract performance by
identifying the possibilities during the pre-award phase and taking
steps at that time to avoid them. However, conflicts of interest cannot
always be foreseen or avoided prior to award and POs need to be
aware of what they are and what to do about them if such situations
do arise during the performance of a contract.

      FARSubpart 9.5 defines an organizational conflict of interest as
a situation that exists "when the nature of the work to be performed
under  a proposed  Government contract  may, without  some
restriction on future activities, a) result in an unfair competitive
advantage to the contractor, or b) impair the contractor's objectivity in
performing the contract work." It is the latter situation that is of the
most concern during contract performance.

      Any of  the  contractor's outside interests,  be they
organizational, financial, contractual, or of some other type could
affect its objectivity in performing work for EPA. This is most likely
to occur in contracts involving consultant or management support
services, but the possibility exists in all contracts. Regulations require
that the CO take immediate steps to avoid, neutralize, or mitigate any
actual,  potential, or apparent conflict of interest once notified of its
existence.  POs and  DOPOs are required to notify their CO
immediately if they see or suspect a situation where a contractor's
outside interests are affecting  its independent judgment in
performing work on an EPA contract, or if the appearance of such a
conflict exists, even if the work performed by a contractor is not in fact
biased or lacking in impartial judgment.
TOSS User's Guide            August, 1991                      A-9

-------
Appendix A
What To Look For


      All EPA contracts over $10,000 contain a clause requiring the
contractor to disclose in writing to the CO any actual or potential
conflict of interest discovered after contract award.   Ideally, this
would take care of all such situations and the PO and DOPO need not
be further concerned.  However, many times  what may not be a
conflict in the mind of the contractor could be a very significant
problem in the opinion of the Agency, but if the contractor does not
notify EPA, the CO is not aware of its existence. If the contractor is
aware of such a situation and fails to notify the CO, the contract may
be terminated for default For these reasons, POs and DOPOs must be
"on the lookout" at all times during contract performance for
situations that might be classified as organizational conflicts of
interest, and must notify the CO if a potential one is discovered.

      POs and DOPOs should subject all such situations  to the
following tests:

      •     Is the contractor being asked to perform work that
            will affect an industry of which it is a part, or from
            which it derives a substantial portion of its income?

      •     Is the contractor performing an analysis for EPA that
            it is also performing for a firm  that will be affected by
            the results of that analysis?

      •     Is the contractor performing consulting services for an
            industry regulated by EPA at the same time as it is
            under contract to EPA for any work on the same
            subject?

      •     Do the work results provided by a contractor appear
            to be lacking in complete objectivity from any aspect?

      •     On any Superfund contracts, can the contractor
            potentially be found liable as a responsible party on
            any site for which it is being asked to perform work
            for EPA?

      •     Is there any possibility that even the appearance of
            one of these situations might undermine the
            credibility of the work results in the opinion of the
            general public?


A-10                     August. 1991           TOSS User's Guide

-------
                                                 Conflict of Interest
      If the answer to any of these questions is in the affirmative, an
actual or potential conflict of interest probably does exist, and the CO
must be notified immediately.
Procedures to Follow
      As stated above, if a determination is made that an actual
potential, or apparent conflict of interest does exist, the CO must take
immediate steps to avoid, neutralize, or mitigate the situation. This
may take the form of a bilateral contract modification, under which the
contractor agrees to refrain from performing any specific outside
work for a certain period of time, or is barred from specific future EPA
work for a specific period. Or the CO may direct the PO not to assign
a specific Delivery Order to the contractor.

      If the conflict is significant and the CO is unable to resolve or •
avoid it, the contract may have to be terminated for the convenience
of the Government, either in whole or in part, depending on the nature
of the conflict. Since all of these possibilities are less than desirable, it
is far preferable to identify potential conflicts before award of the
contract, and take steps at that time to prevent any conflicts of interest
from occurring during performance of the work.
TOSS User's Guide            August, 1991                       A-ll

-------
      4.    SUBCONTRACTING AND
            CONSULTING LIMITATIONS
Subcontracting and Consulting Limitations
      A sizeable portion of many EPA contracts is performed by
subcontractors.  This  is often necessary for  the  successful
accomplishment of the program mission. It extends the expertise of
the prime contractor to respond to the needs of the Delivery Order,
and it provides specialized services for specific tasks that ordinarily
would not be needed. Prime contractors can make use of two types of
subcontractors:

      •    Team subcontractors, which are an integral part of
           the prime contractor's technical team and perform
           basic contract tasks as outlined in the prime
           contractor's proposal

      •    Non-team subcontractors, which provide very
           specialized  services for the prime contractor that
           cannot ordinarily be provided by the prime or its
           team subcontractors

      Team subcontractors can be used by the prime contractor to
work on any assignment that the prime deems appropriate.  EPA
approval of team subcontractors is not required.

      Non-team subcontractors are used by the prime contractor on
an as-needed basis only, and must be procured competitively by the
prime. All non-team subcontractors must be approved by EPA before
they can begin work.

      Federal and EPA acquisition regulations and procedures
require that the prime contractor  make reasonable advance
notification to the CO of its intent to subcontract. This notification
should provide the following information:

      •    Evidence mat proposals from at least 3 firms were
           received and evaluated by the prime contractor
TOSS User's Guide           August, 1991                     A-13

-------
Ar
      •     A description of the supplies or services being
            ordered.

      •     Name of the subcontractor that has been selected

      •     Explanation of why the subcontractor was selected
            and the degree of competition

      •     Proposed cost estimate of the selected subcontractor

      •     Summary of negotiations

      •     Type of subcontract.

      On receipt of this notification, the CO should request assistance
from the PO and the DOPO in reviewing the winning subcontractor
proposal  for technical adequacy and reasonableness. Following the
PC's and DOPO's review, a recommendation is sent to the CO stating
whether  the subcontractor should be approved  for work.  The
ultimate approval decision comes from the CO in the form of written
modification to the contract signed by the CO.

      The Government cannot direct the contractor to subcontract
any part  of the work.  The Government may also not, under any
circumstance'  direct the  prime contractor to subcontract with a
specific firm. .. ven a suggestion of a particular firm or firms would be
improper.

      Exhibit A-3 provides a list of questions that the PO and DOPO
should ask when reviewing non-team  subcontractor propr ils.
Exhibit A-4  lists some key points to remember when revie   rig
subcontractor proposals.

      EPA should be sure to allow sufficient time for the prime
contractor to conduct its non-team subcontractor competitions. This
will enable additional organizations such as 8(a) firms to compete.
Consultant Approval


      Often in the performance of EPA contracts there is a need to
bring in a consultant with a particular expertise to assist in some aspect
of the work. Usually, the technical performance benefits greatly from
4-14                      August, 1991            TOSS User's Guide

-------
                                   Subcontracting & Consulting Limitations
such expertise. However, hourly or daily rates charged by consultants
are often prohibitive and may not be commensurate with the technical
benefits EPA might derive. Therefore, when the use of consultants is
anticipated, the CO will insert a clause into the contract requiring the
contractor to obtain EPA approval before a consultant is used. The
technical qualifications of the proposed consultant, the benefits to be
derived from his or her  use, the amount of usage, and the rate
proposed are all reviewed by EPA before approval is granted.

       The same rules about directing consultant work as set forth
above for subcontractors are applicable.  EPA cannot  direct  the
contractor to hire any consultants or influence the selection of such
consultants in any way.

                         EXHIBIT A-3
   WHATTOREVIEW IN NON-TEAM SUBCONTRACTOR PROPOSALS
  1.  Are the non-team subcontractor services necessary and can they be
     justified?

  2.  Is the non-team subcontractor better qualified than the prime contractor
     or any of the team subcontractors to provide the needed services?

  3.  Is the selection of supplies, equipment, or services technically justified?

  4.  Is the technical approach adequate to meet the SOW's requirements?

  5.  Does the subcontractor have a potential conflict of interest with the work
     to be performed?

  6.  Are the proposed deliverables the same as those specified in the DO
     SOW?

  7.  Have the technical requirements of the prime contract been translated
     into the subcontract?

  8.  Does the proposed schedule match that in the DO SOW and is it
     reasonable?

  9.  Are the level of effort and budget reasonable? Too generous? Too tight?

 10.  Are the subcontractor's costs justified?

 11.  Will the proposed subcontract require the use of government-furnished
     property or facilities and, if so, has proper consideration been obtained?
TOSS User's Guide             August,1991                        A-1S

-------
Appendix A
                           EXHIBIT A-4
                               BEMBMBBRSBGAit
  1.  EPA cannot direct the prime contractor to subcontract with a specific
     firm.

  2.  Contractor requests for consent to subcontract for services or supplies
     outside the scope or terms of the contract shall be denied.

  3.  Only the CO can give consent to a subcontract

  4.  EPA's only direct contractual relationship is with the prime contactor;
     no relationship or communications shall exist between EPA ana any
     subcontractor at any time.

  5.  It is the prime cr--tractor's responsibility to arbitrate any disputes it has
     with the subcontractor.

  6.  Subcontractor consent should be in the form of a written modification to
     the contract signed by the CO.

  7.    ne prime contractor is completely responsible for total performance and
     .management of its subcontractors.
A-16                          August, 1991              TOSS User's Guide

-------
      5.    TECHNICAL DIRECTION
      Throughout the period of performance, the FO and/or DOPO
will often need to communicate with the contractor to direct the effort
and ensure that the desired results are achieved. Technical personnel
must be careful, however, not to provide technical direction unless the
contract contains a clause permitting them to do so.

      Technical direction is the responsibility of the PO and the
DOPO, as indicated in the Technical Direction clause. It specifies that
the PO "will give technical direction on contract performance/'
including (1) direction to the contractor which assists the contractor in
accomplishing the statement of work, and  (2) comments on and
approval of reports or other deliverables.

      Technical Direction Must NOT:

      •     Order additional work outside the Delivery Order or
            contractual SOW

      •     Constitute a change in the Delivery Order or
            contractual SOW

      •     Increase or decrease the estimated cost of the Delivery
            Order or contract

      •     Alter the period of performance of the Delivery Order
            or contract

      •     Change other express terms and conditions of the
            Delivery Order or contract.

      Technical direction must be provided in writing. If the DOPO
provides technical direction orally to the contractor,  this direction
should be confirmed in writing within 5 calendar days. Copies of
technical direction should be forwarded to the CO.
TOSS User's Guide            August, 1991                      A-17

-------
Appendix A
       While there are many types of direction that are authorized for
technical personnel, the following activities are prohibited.
                               EXHIBIT A-5
                                                    ......... •'. •».
  DONT:

  1.  Discuss or divulge any information on a DO to a contractor or its
     subcontractors/consultants prior to issuance.

  2.  Authorize work to begin before issuance of a DO.

  3.  Make changes or issue orders that will affect the terms or conditions of
     the contract. Only the CO has this authority.

  4.  Give technical direction that will increase costs or the level of effort or
     change technical direction of die contract or DO.

  5.  Direct or request the contractor to perform services (e.g., hire and fire,
     assign and organize work) that create an employer/employee
     relationship (See PEA Directive 1900.1).

  6.  Direct the contractor to perform servicers that are "inherently
     governmental'" in nature (e.g., making policy).

  7.  Direct any portion of work to be performed by a subcontractor rather
     than the prime contractor.

  8.  Instruct the prime contractor to subcontract with a specific firm.

  9.  Consent to a subcontract. Only the CO has that authority.

 10.  Provide technical direction to a subcontractor (only EPA and the prime
     contractor have a contractual relationship).

 11.  Create a personal COI situation, such as working as a part-time
     consultant in the technical field relating to  the contract or approving
     situations that may create a COI.
A-18                          August, 1991               TOSS User's Guide

-------
      6.    TRAVEL, CONFERENCES,
            AND TRAINING
      DOPOs should be aware of several 'policies with regard to
travel, conferences and training:

      •     Time spent traveling to and from appropriate
            conferences and training should not be included as
            hours worked.

      •     The contractor shall not bill for travel not directly
           'required for performance of the Delivery Order:

      •     The contractor shall not bill EPA for training its
            employees receive, unless it is a highly specialized
            training that has been approved in advance by the
            CO.

      •     The contractor shall not bill for attendance at
            conferences that are not specifically tied to the
            performance of the Delivery Order. Such conferences
            must be noted in advance in the Delivery Order's
            Statement of Work with detail supporting the
            relationship to the performance of the Delivery Order
            provided.

      In addition, Comptroller Transmittal 88-27, issued September
22,1988, addressed the matter of travel discounts for Government
contractors, updated by the General Services Administration Federal
Property Management Bulletin A-95, dated August  19, 1988.
Agencies are encouraged to promote the use of travel  discounts
available to contractors to help reduce  direct reimbursements for
travel expenses. However, the provision for such discounts is at the
discretion of each participating vendor.

      The Federal Travel Directory (FTD) is the source document for
determining which vendors have agreed to extend travel discounts to
contractors. PCMD must furnish a letter of identification on Agency
letterhead, signed by the authorizing CO, in order for the contractor
to obtain such an authorization for each of the.contractor's employees
for each separate trip.
TOSS User's Guide            August. 1991                     A-19

-------
Appendix A
      Recent guidance on procurement of conference support has
been issued by EPA in-the form of a draft chapter in the Contracts
Management Manual.  This guidance was issued by  PCMD on
February  17, 1991  and established policy and procedures for
procuring services  in support of EPA-sponsored meetings  and
conferences. The following requirements were issued as  part of this
guidance:

      •     EPA's Financial Management Division must concur
            on any plans to charge a registration fee to EPA
            employees at an EPA-sponsored conference, either
            directly or through a contractor.

      •     Initiators of procurement requests involving
            conferences or meetings at EPA Headquarters are
            responsible for contacting the Facilities Management
            and Services Division for the assignment of
            conference and meeting facilities.. The Agency is
            required to use Government-controlled space f-.T EPA
            conferences and meetings if suitable space is available
            in the area.  If space is not available, the FMSD may
            authorize the procurement of commercial facilities.

      •     Generally, the cost of meals and refreshments is
            considered a personal expense even when it c .curs in
            a business-related setting. Therefore, contracts
            should not normally include expenses related to the
            serving of meals or refreshments to participants at a
            meeting or conference. There are limited exceptions
            to this rule, such as to provide small "samples" of
            ethnic ft  :  as part of an ethnic awareness program.

      •     When it ki lecessary to pay a fee or honorarium in
            addition tc the regular per diem rate in order to
            obtain a speaker or presenter, the prosed fee must be
            approved by the initiating program office and the CO
            prior to obligating the Government.

      •     Whenever audiovisual equipment is needed for EPA-
            sponsored meetings or conference^, the initiator
            should contact  the cognizant Headquarters  or
            Regional facilities management group to determine if
            the necessary equipment is available.
A-20                     August. 1931            TOSS User's Guide

-------
                                      Travel, Conferences, ft Training
            Transportation and lodging can be paid to non-EPA
            participants for attendance at an EPA-sponsored
            meeting, conference or symposium through issuance
            of an Invitation Travel Authorization, in accordance
            with procedures in the EPA Travel Manual
            (Resources Management Directives System 2550B).

            EPA will not provide funds for contractors or other
            non-EPA personnel to attend non-EPA sponsored
            conventions or meetings unless the Agency has
            specific statutory authority to do so.  However, where
            travel to such conventions or meetings is incidental to
            the performance of a specific contract, EPA may
            reimburse travel and lodging expenses in accordance
            with the applicable cost principles in FAR.
TOSS User's Guide           August, 1991                       A-21

-------
      7.    PUBLICATIONS
            AND PRINTING
      The Facilities Management and Services Division manages
EPA's printing facilities and is responsible  for assuring that
appropriate  EPA publications are accessible  to the taxpayer  as
required by  the Joint Committee on Printing.   The Division also
provides copies of documents to the Headquarters Library for
reference and use by EPA personnel.

      There are several restrictions, based on P.L. 100-202, involving
printing, binding, and copying by contractors. "Printing" means, in
general, the  artistic development of covers and the production of
entire documents, generally using equipment and producing results
that are superior to those found in day-to-day work at EPA. "Binding"
means the various methods used to pull several sheets of paper into
one document; it includes glueing, stitching, use of plastic spiral
binders, etc   "Copying" means the reproduction of a document;
otherwise know as "Xeroxing".

      PCMD has stated that in general, any printing or binding must
be done by  either the EPA's printing plant  (Room G-100D  in
Headquarters), or through the printing plant under a contract
arranged with the Government Printing Offices (GPO).  Apparent
exceptions to this restriction involve classes  of work the Joint
Committee on Printing (JCP) considers to be urgent or necessary to
have done elsewhere, and work authorized by law, which the Public
Printer is not able or equipped to do at the GPO. For this latter case,
the work may be produced elsewhere under contractors made by the
Public Printer with the approval of the JCP.

      Copying can be done by EPA contractors, within specified
limits. Contractors may duplicate less than 5,000 units (copies) of only
one page, or less than 5,000 units in the aggregate of multiple pages for
any individual "requirement", which is interpreted to mean per
delivery order. Keep in mind that copies of the monthly project status
and financial reports count against this ceiling.
TOSS User's Guide            August, 1991                      A-23

-------
      8.    GOVERNMENT FURNISHED
            PROPERTY (GFP)
      It is EPA's general policy that contractors should provide all
resources necessary to perform Agency contracts.  Nevertheless,
situations do arise when it is in the best interests of the Government to
furnish  certain property to the contractor.  When Government
property is, or is proposed to be, in the hands of contractors, certain
policies and procedures are applicable, and POs need to be aware of
them.
Justification of Needs


      Whenever a PO  recommends property be provided to a
contractor, a written justification of need must be submitted to the CO.
The justification must address thefollowing seven points, and must be
signed and approved at the Division Director or equivalent level in the
program office:

      (1)    Identify the specific program and project for which
            the property is required, as well as the contract and
            the Delivery Order number. Also, identify the EPA
            account numbers that the item is to be charged
            against

      (2)    Identify the type, quantity, and estimated cost
            (including any transportation or installation costs) of
            each item of property required.

      (3)    Explain why the property is necessary for contract
            performance.

      (4)    Explain why it is in the interest of the Government to
            provide the property rather than to require the
            contractor to provide the property at no direct cost to
            the contract

      (5)    Identify the location of the contractor's facility at
            which the property will be used, and the contractor's

TOSS User's Guide            August, 1991                     A-25

-------
Appendix A
            personnel responsible for acquisition and
            management of the property.

      (6)    For property to be acquired by the contractor at
            Government expense, include a certification that no
            in-house or GSA excess property is available and
            include the concurrence of the local property office.

      (7)    For equipment to be acquired by the contractor at
            Government expense, include a lease vs. purchase
            analysis.

      The CO reviews the justification and may or may not concur
withtl ^recommendation. Of particular concern is whether or not the
equipment  is special purpose or general purpose.  It is against
Government policy to furnish items of a general purpose nature (such
as furniture, typewriters, etc.) rather than the contractor.
Property Provided by the Government Versus Property
Acquired by a Contractor
      There are several reasons why it is preferable for the
Government to provide property to the contractor rather than have
the contractor acquire it at Government expense. First, it is usually less
costly for the Government to purchase it Second, the Agency's
competitive procurement procedures should result in a better price
than the contractor could obtain. Finally, it could be perceived that
program offices are  attempting to bypass budget   flings  on
equipment and other items by using contract funds     Hain the
property.
The Contract Property Administrator
      A Property Administrator is an EPA employee designated by
the CO in the contract to act as the GO'S representative in certain
matters concerning the management and control of r -vemment
property.   POs sh* '.Id assure that  Doth the CO  ax.  Property
Administrator are   ays informed on all matters affect,  g contract
property administx —on.
A-26                      August, 1991            TOSS User's Guide

-------
      9.    INSPECTION
            AND ACCEPTANCE
      Inspection involves examining and testing products and
services to determine whether they conform to contract requirements.
The purpose of inspection is to ensure that the contractor complies
with all technical requirements of the specifications or SOW.

      According to the FAR, acceptance is the act of an authorized
representative of the Government by which the Government assumes
ownership of equipment or supplies, or approves specific services
rendered as partial or complete contract performance.

      In most  cases, the CO delegates the authority and
responsibility for performing inspections and acceptance to the PO
and/or the DOPOs.
Inspection
      Inspection of products and services can be performed using
both simple and complex methods. A simple method, for example,
might be to compare an actual service or product with what was
specified in the Delivery Order or contract A complex method, on the
other hand, might use special monitoring and testing equipment to
inspect a newly installed mainframe computer to ensure mat it meets
the specifications of the contract.

      The types of. inspections normally performed in conjunction
with IR acquisitions include:

      •     Hardware acceptance testing - ensuring that the
            equipment meets a certain level of performance

      •     Software acceptance testing - comparing the final
            source code to the design specifications

      •     Site visits - compare actual performance with
            reported performance
TOSS User's Guide           August, 1991                     A-27

-------
Appendix A
      Contract clauses contain general provisions for Government
inspection, and  the PO and DOPO need to know what these
provisions say. The Government has the right to perform inspections
during contract performance; however, inspections should not be
performed in such a manner as to unduly interfere with or delay
progress. Furthermore, if the Government is contractually obligated
to perform an inspection at a specific date and time, or within a
specified number of hours after request by the contractor, failure to
meet the deadline is technically a breach of the contract by the
Government, which could result in a claim from the contractor.
Acceptance
      Acceptance is acknowledgement by the Government that
supplies  or service*  conform to applicable contract quality and
quantity  requiremer 3.  Acceptance should not be confused with
delivery; work may be accepted before delivery,  at the time of
delivery, or after delivery, depending on the terms of the contract.

      Acceptance is usually evidenced by execution of an acceptance
certificate or by whatever means is specified in the contract. Any
product that does not conform to the contract specifications may be
rejected  by the  Government, but this  seldom occurs because
contractors are normally given the opportunity to correct defects.

      If the contract cannot meet or correct the defects in time to meet
a deadline, the Government has an alternative to rejection, which may
be in its best interest The non-conforming items may be accepted in
return for some consideration, such as reduction in price. In firm
fixed-price contracts, the contractor bears all costs associated with
brining supplies into conformance.

      POs and DOPOs are major participants in this process, since
COs often defer to their judgment on what course of action to take.
Therefore, POs and DOPOs should be aware of the available options
and recommend a decision that is best for their programs.
A-28
August, 1991
TOSS User's Guide

-------
    APPENDIX  B
     Appendix B contains a Model Delivery Order Package. The
following completed forms are included:
     •    Procurement Request - Form 1900 - 8
     •    Administrator's Screens
     •    Split Funding Justification
     •    Superfund Justification
     •    Designation of DOPO- Form 1900 -65
     •    Statement of Work
     •    Labor Mix and Budget
     •    Statement of Non-Duplication of Effort
     •    7 Point Justification for Government Furnished
         Property
     •    Pricing Rationale if the Delivery Order is Ceiling Price
TOSS User's Guide         August, 1991                 B-l

-------
       a'areas are lor use of procurement office only]
                                                                                                          of
«EPA
           Washington; DC 20460
          Procurement
        Request/Order
                                           i.NameoJ{J"9"»ator
3. Mail Coda

     3ES21
                                                          4. Telephone Number

                                                             301-266-9180
                                                                               ne of Requniti
                                             5. Dan Ram Required
  Signature of Originator
                                                7. Recommended Procurement MaincdNA. DO  UILder existing COn
                                                DcompaiitrM  D Other thin full tnd open competition 'USotetaiircaimiiipufcniM
J. Deliver TeTrVe/ect Manager)

               Dee.
                                            839  Bestgace Road
                                            Annapolis, Md.  21401
                                                                10. Mail Coda

                                                                  3ES21
                                                                                       11.' Tolaphona Numbar
                                                  301/266-9188
    12.
  Financial
    Data
a. Appropriation
                                        g. Servicing Financa Off ic« Numbar
                                NOTE: Item 12(d) Document Type — Contract = "C."

                                      Purchase Order = "P"
  	:FMOUsa..
                             Obcument
                           Central Number
                                                         Account Number
                                                                                                  Amount (hi .
                                                                                                 Dollar*
                                                                                                                Cam
                                                       1A4E03NOAP
                                                                   25.16
                                                             25.796
                                                                                                               10.
                                                       1TFA03N700
                                                                                             60-190
 13. Suogened Source flVa/n* Adttr«u.ZJP Codt. Phont/Contact)
     Computer Sciences Corp.
     6565 Arlington Blvd.
     Falls Church, VA  22042
                                             14. Amount of money
                                              comminad ia:
                                                  D Original
                                                  D Increase
                                                  D Decrease
                                IB. For Smoll Purchaaa* Only: Contracting Office it autho-
                                 rind 10 exceed the amount ahoivn in Block 12(h) by 10% or
                                 1.100. whichavar ia lea*.
                                  Dree     DNO
                                                           d. Property Management Officer/Designee
 a  Branch/Office
     Orter
 b. Division/
     Green
  . Funds listecmBlock/2arft B
                       18. Oid^r Numb/.- -
                       -'r''
                                                 18. conuan numoer f/r mnyi -._•••• • •
                                                   "
                                                                           23,.Person Taking Order/Quote and
                           22. Delivery to FOB Pwm by On or Mart (DtteJ
                                                                                 Reference your quote /See o/oc* 23y
 .4. Contractor (Name, address. ZIP Code)
                                                            Pleeee f urhieh theebove on the terma specified on both eides of thit oroer and on
                                                            the anached sheets, if any. including delivery es indicated.
                                                           D b.  Delivery provisions on the reverse ere deleted. The delivery order is
                                                             •.  subject to the terms and conditions of the contract. (Sn Block 191.
                                                            "c.  Dorel   D Written   D Confirming
                                                      26. Schedule
   item
  Number
    lal
                          Supplies or Servicea
                                (bl
                                                            Quantity
                                                    10
                                                          Unit
                                                           Id)
                                 Estimated
                                 Unit Price)
                                    (e)
                                                                                                   Aceemed
           Contract  #68-WO-OOA3
           Delivery  order Title:

                 Computer Operations  Support
                 Service  to Central Regional
                 Laboratory,  Region III.



                 -See Attached Statement  of Work.
                                                                5,986.9
     70Z charged  to  Superfund in  accordance with  existing
       boratory >n«Meiim Policy.    - ^_

                                                                           . Total t
 27. United Slates of America
    By (Signature)
                                                           28. Typed Name and l

-------
                     Prohibited Contracting Activities at EPA
                         /As Specified by Administrator Reillvl

As a Delivery Order Project Officer, you are expected to avoid the following activities. Rea<
etch itJm and check a Yes or ,Np• jicate whetheryour order allows for the actmty.

 1 ; The actual ipreparatiph of Congressional testimony                        v« ( ) NO oo

 2.  The interviewing or hiring of individuals tor employment at EPA             Y«( ) ND; * <*

 5  Participating as a voting member on a Performance Evaluation Board;      Yes(  ) N»Q(
  '••• participation in and/or attending Award Fee-meetings

 6. Preparing Award Fee letters, ey   under typing services contracts          w  ) .ND(X

 7, The actual preparation of Awar  ^ee Plans                              Ves<  >

 8. The preparation of documents on EPA letterhead otherthan routine.        v«<  )
    administrative correspondence                       '..-.'..

 9  Reviewing vouchers and invoices for the purposes of determining          v»< ). :NDO<
   ' whether cost, hours, and work performed are reasonable

 1 0 The development of Statements of Work, Work Assignments, Technical     Yes i )
     Direction Documents. Delivery Orders, or any other  work issuance
     document under a contract that the contractor is performing or may perform
                                "••"''•»' *l                             "
 11   On behalf of EPA actually preparing responses to audit reports from the     Yes (  ) NO 0
               ^

 1 2. On behalf of EPA, actually preparing responses to Congressional           ves (  j  NO c-
     correspondence

 1 3  The actual preparation of responses to Freedom of Information Act          Y« (  )  MB (.
     requestt^KMnan routine/non-judgmental correspondence  .n all
     cases. EPA must sign it

  14. Any cornrtct which authorizes a contractor to represent itself as EPA to       Y«( .) -MI
     outside parties                         '

  15. Conducting administrative naarings                                      *

  16. Reviewingjnd:.gs eoncemingthe eligibility of EPA employee for           Y«(  ) NO
     security clearance

  17. The actual preparation of ar slice's official budget request                *«(    xt

-------
                         Activities of Potential Vulnerability
                           (As specified bv Administrator Reillyt

 The following activities very  often require contractor involvement in programs that  are
 dependent upon contractor support to accomplish their mission. These activities may result m
 the improper use of contractors if internal controls to  ensure proper oversight have not been
 established.  They may also lead to the perception that inherent Government' functions have
 been assigned to contractors.  Whenever contractors are used to perform these tasks. Agency
 employees must play an active role in overseeing the effort and making all final decisions. This
 requires close monitoring to ensure that final outputs reflect the Agency's positions, thoughts.
 and ideas.

 For each item, check a Yes or No to indicate whether  these activities will occur under your
 Delivery Order. If yes, please attach an explanation or justification for each item.

  1. Budget preparation support including workload modeling, fact-finding,      Yes( j  No(X)
    efficiency studies, should-cost analyses, etc.

  2. Reorganization and planning support                                   Yes( )  NO(X)

  3. Support services such as analyses, feasibility studies, etc. to be used       Y«( )  No(X)
    by EPA personnel in  developing policy

  4. Regulation development support                                       v«( )  No(X)

  5. Any support in the in-house evaluation of another contractor's performance  Y«S.( ) NOOO

  6. Involvement in strategic acquisition planning                             Y«( )  NO CO

  7. Support on improving contract management                             vest )  No(X)

  8. Providing specialized expertise in the contractor selections process         vest )  NO
    behalf to outside parties

-------
Justification for Split Funding
This request is for services of a  Program  director ar.cl
Program "Assistant to effectively aa-inister  .11  of t.u.e
records management services under  the  LA3AT-ANDERSON,
Incorporated'(LAI) Contract, No. 65-W9-0052.   The  Program
Director will direct and supervise ail LAI records mar.agemen:
staff presiding services to SPA's  Headquarters offices,
Regions a. d field offices with the Program Assistant alsc
providing support for this function.

M • • w • •• *v ™ V 2 *i  a " * %l ^ ^ V '^•fO^COO** '*^*J  •MA  3 w «« *w a •»  ^ « •» A ^* • ^ w  •• ^
^ ^ ••••<£ . - v " *  O • • **W • .t W«C*d€»«* ^ J  »«*S  • • WW • fl»
-------
It is expected that this percentage will hold stable
throughout the remainder of the fiscal year.  To assure tha:
this split remains an accurate representation cf orders
funded out of the Superfund appropriation and the Agency's
operating budget, this Testification .will be reviewed and,
when needed, revised to. reflect an accurate funding ratio.
Daiva 3al
-------
Justification for supeffund monies:

Delivery Order:  "Computer Operations Support  Service  to Central
Regional Laboratory, Region III"

The Central Regional Laboratory (CRL) has established support for
a variety of  EPA programs.  Among the  programs  supported by CRL
includes supporting the Superfund program.    In addition CRL has
a facility policy, supported by sample  and data review loads, on
appropriate expenditures  charged  to the Superfund  program.   The
proposed  delivery order  supports the  facility  in general  and
therefore  would  charge  appropriate  expenditures  against  the
Superfund program according to this policy.

-------
  oEPA
                        Designation and Appointment of Project Officer/
                       Work Assignment Manager/Delivery Order Officer
                                      (For Otliir Thin
     Note: This form is not a Contracting Officer warrant. Delivery Order Officers and Administrative Delivery
     .Order Officers require a warrant of Contracting Officer authority. Any request for a Delivery Order Officer
     warrant mult be accompanied by the additional information required in Chapter 8 of the Contracts Manage-
     ment Manual.
 e. Qrgoniuiion
                                                                         < ' Voars of Contract Exoorionca
 2. Th« nomination it tor

      D  Proton Off icw

      D  w« Wr™M.n^

      D  OoMorv Craw Officor

      LJ  •dminiHiaiioo Doli»on» OrOOf Olficor
                                                 3. Tho

                                                   a. CompMiM tho

                                                   s. CompioiM mo O
  •fotaa Off wtr Court*
                                                                              og
                                                           flf
                                                                            OOfformonco
          Data
              'OrdorPfoioctOff*
                                                                        M0Mi JO «*i« «T
                                                    Q. if tfie) noffimeje) tUM not oofHptMetf ttie) bMic Pro*
                                                      i«et Officer Coura* or m* Contract Admni*.
                                                      tranon Caurarnn • waiver or mtorirn
                                                      cajrtif icofion ooon i
Mo
Q
a
a
                                                                                       a    c
                                                    it m» MnMr to *
                                                                                OffiCMl C«nmei M« Cop«

-------
         Statement of Work to Provide:
Computer Operations Support Service To Central
        B^gional Laboratory, Region III

-------
1.    TITLE:  Computer Operations Support Service To Central .Regional
              Laboratory, Region in
2.    PERIOD AND PLACE OF PERFORMANCE:
           Effective Date of Delivery Order through July 1,1991.
3.
      Mr. John Doe
      Central Regional Laboratory
      839 Bestgate Road
      Annapolis, Maryland 21401
      Phone (301) 999-9999
      Ms. Sally Smith
      Central Regional Laboratory
      839 Bestgate Road
      Annapolis, Maryland 21401
      Phone (301) 777-7777
4.     PROJECT BACKGROUND INFORMATION

      The EPA Region in, Central Regional Laboratory's (CRL)
      Laboratory Branch in Annapolis, Maryland provides analytical
      laboratory capabilities in support of regional EPA activities. These
      activities include supporting Superfund, Public Water Supply, Water
      Quality Enforcement, and Water Quality Management program
      efforts. The CRL Quality Assurance (QA) Branch oversees regional
      EPA contract laboratories and is responsible for the development of
      QA documentation in support of internal environmental data
      collection activities and the review of data and QA documents for
      external operations.  In addition, CRL conducts facility and
      discharge inspections in support of the National Permit Discharge
      Elimination System (NPDES) program.  As a Regional
      Environmental Services Division facility, CRL is expected to be a
      center of scientific excellence and knowledge base supporting the
      Region's and Agency's environmental programs.   In the past CRI
      has invested in modernizing (by introducing computerized tracking
      and reporting systems) its ability to quickly react to environmental
      issues with added computerization.  Commensurate with added
      automation and electronic tracking is the need to maintain the
      systems introduced to support our role within the Agency.
    Computer Operations Support Service To Central Regional Laboratory. Region III
                               Pagel

-------
      Due to the high degree of specialization and experience required to
      operate a number of systems, CRL can not provide internal (EPA
      staff) computer support staff with the experience and knowledge to
      operate, maintain, repair or service this hardware and software on a
      daily basis. The Central Regional Laboratory requires contractor
      support  and services to manage computer operations supporting
      each Branch.  These operations include the faculty's Laboratory
      Information Management System (LIMS) and the facility's office
      automation local are network (LAN).  Thus CRL requires LAN and
      PC maintenance, repair and operations support. The Technical
      Operational Support Services Contract provides the mechanism to
      perform this service. All tasks will be consistent with the Agency's
      Scientific ADP modernization plans.

      Contractor support is also required to assist in the development of
      documentation for standardization and automation of quality
      assurance activities as well as to update statistical packages and to
      develop software to assist the QA Branch in its tracking efforts.
      These efforts are not related to Laboratory Analytical automation
      activities are are therefore not covered by other Scientific Automation
      contracts that the Agency currently maintains. Further,
      documentation to be developed must be consistent with EPA policies.

      Requirement studies will be used to provide evaluations and
      recommendations of syster .»  or software which would implement
      computer automation  technology  within the facility.
      The purpose of this delivery order is obtain contractor services for the
      support and management of current ADP systems.  Additionally,
      support is required for the production of user and technical guides.

&    TASK DESCRIPTIONS

Task 1:    Project Plan

      The contractor shall prepare a draft project plan which describes
specific tasks to be accomplished. In the project plan, the contractor shall
include:

      •    A description of how all tasks will be carried out, including a
           brief description of each task
      •    The proposed approach for completing each task
      •    A list of milestones, reports and deliverables
      •    A list of any potential problem areas or assumptions
    Computer Operations Support Service To Central Regional Laboratory, Region HI
                                Page 2

-------
      •    A detailed budget, including a breakout of labor hours and
           other direct costs.  A rationale needs to be provided for any
           changes from the budget ordered in the statement of work
      •    Resumes of contractor staff assigned to each task.

The draft project plan shall be delivered to the DOPO and ADOPO no later
than 15 days from start of the delivery order, for review and comment.
Once the DOPO and ADOPO have reviewed and commented, the contractor
shall revise and finalize the project plan within 5 days for EPA approval.

Deliverables:      la   Draft  Project Plan
                 Ib   Final  Project Plan

Task 2:    Maintain Frigfmgfinfl.il/HrM Pankagiaa

      Existing information management systems will be managed,
maintained and possibly modified. The contractor will provide operational
support and software modifications as requested by the delivery order
project officer. Due to the uncertainty associated with this task, this
delivery order will follow a FORMAL WORK REQUEST SYSTEM employed
at this facility (see Attached Form.)  The existing programs include, but are
not limited to the following systems:

      A.   Contract Coordinator Program (AFC)
      B.    Laboratory Chemical Inventory System (LCIS)
      C.   Regional Sample Control Center (RSCC)
      D.   Time Accounting System (TIME)
      E.    Travel Accounting System (TRAV)
      F.    Accounting of CRL Blanket Purchase Req. (ACCOUNT)
      G.   Statistical Packages for CRL Audits (SUMSTAT)
      H.   Metals QC Program (METQC)
      I.    QA Document Tracking System (QAP)
      J.    ESAT Tracking System (ESAT)

Deliverables:      2    Completed Formal Work Request Form
Task 3:     Create a Technical Assistance Reporting Tracking System

      Create a technical assistance reporting tracking system to help the
QA branch track provided technical assistance. The system is to track the
names, dates, categories of assistance, and requestor for technical activities
provided by the staff. The system must conform to CRL QA software
policies ("CRL POLICY For the Development of PC Based Software",
DEVEL.POL, 5/3/88, Attachment D to FY91 PC PLAN and "CRL POLICY
For PC Based Software Modifications, Enhancements or Alternations of
CRL Application Programs", MODIFY.POL, 3/17/88, Attachment E to FY91
PC PLAN) and will be implemented on the facility's LAN system. The
    Computer Operations Support Service To Central Regional Laboratory, Region III
                               Page3

-------
software used to create the system must be compatible with dBase HI+ and
menu driven.

Delivc ables:      3a   Menu Driven System Software
                 3b   System User Guides
Task 4:     Operate and Mnnngla Rrirfitig LAV and A Jminiata«QH^
           Computers

      The contractor shall operate existing systems so that these systems
are compatible with CRL operations. These systems include tape
management, disk management, equipment scheduling, communications
and communications sub-systems, maintenance and repair of hardware
and software documentation library, logging of hardware and software
errors and downtime, and corrective action for problems of a routine
nature.  The contractor will provide backups on a regularly scheduled basis
and keep inventories -f ADP equipment and supplies,  an operations guide
will be maintained on-line and modified as procedures change.

      The functions which the contractor shall perform in the system
management and operations area include the following:

      A.   Maintain system backups of programs and data
      B.    Maintain a systems documentation library
      C.    Maintain user accounts
      D.    Develop and adhere to systems procedures, document systems
           procedures in an Operations Guide
      E.    Evaluate system performance on the LAN(s) and
           administrative computer systems
      F.    Install and  upgrade system and application software
      G.   Investigate systems problems and initiate corrective actions
           where appropriate
      H.   Make recommendations to EPA for hardware and software
           purchases
      I.    Schedule preventative and corrective maintenance when
           required
      J.    Manage disk and tape libraries
      K.    Inform users of scheduled outages
      L.    Provide on-site user support
      M.   Repair and or provide the parts necessary to fix CRL PCs and
           LAN equipment.

Deliverables:      4     Modified On-line Operations Guide
    Computer Operations S  oort Service To Central Regional Laboratory, Region 111
                               Page 4

-------
Task 5:     Provide Training

      The contractor shall provide training to EPA staff on requested terms
such as the Concurrent Minicomputer and/or VAX training, PC-SAS, the
EPA Permit Compliance System (PCS), microprocessor systems and on
software developed or modified by the contractor. Training may include the
use of agency standard software (such as dBase in Plus, Lotus, word-
processing, communications, and graphics) targeted to actual CRL tasks.
Assist in the scheduling, preparation, and teaching of computer related
courses for CRL staff. The delivery order project officer will identify topics,
class size, target audience, class length and frequency.  The delivery order
project officer will use the FORMAL WORK REQUEST SYSTEM to inform
the contractor of the desire to have training sessions.  AD HOC training is
expected to provide to the end users helpful information on the efficient and
effective use of PCs. AD HOC training will be allowed if the duration of the
training is less than 1/2 hour for each instance.  If the requested training is
anticipated to take longer than 1/2 hour, the FORMAL WORK REQUEST
SYSTEM will be employed.

      It is anticipated that the contractor will be required to provide two (2)
scheduled PC related training sessions during the period of performance.
The topics of the courses will be determined by the delivery order officer
after consultations with Central Regional Laboratory management. The
tentative course requirements include LOTS 1-2-3 for laboratory
applications, CRL LAN practices for sharing documents, dBase in for QA
Branch tracking systems or telecommunications access to Agency
computer applications. The contractor is required to schedule and organize
classes, prepare outlines, materials and handouts.  Set up equipment and
teach class. Afterwards, provide to the DOPO a list of attendees, completed
course evaluations and summary of evaluations.

Deliverables:      5a    Training Session Outlines
                 5b    Training  Materials
                 5c    List of Attendees
                 5d    Completed Course Evaluations
                 5e    Summary of Course Evaluations
Task 6:     Develop Stsa*Hand npgraring PrMtMliiraa and Manuals

      Manuals and users guides must be developed for computerized
systems concerning data handling, review, and validation.  The standard
CRL format shall be adopted as provided by CRL's QC officer and all
materials shall be in conformance with EPA guidance documents and
policies. Standard operating specifications for the use of laboratory
hardware and software are expected. Again, the FORMAL WORK
REQUEST SYSTEM will be employed to identify and formalize the requested
documentation.
    Computer Operations Support Service To Central Regional Laboratory, Region III
                               PageB

-------
Deliverables:      6a   Standard Operating Specifications
                 6b   System Manuals
                 6c   System User Guides
Task?:     Provide End User PC Support

      Maintain up to date catalog for the ACI contract (EPA's PC contract)
with information provided by the delivery order project officer of the PC Site
Coordinator. Maintain a paper-electronic inventory of general use supplies
needed for the continued operation of PCs and peripherals. Notify the
delivery order officer when identified supplies need to be resupplied.
Consumable supplies will  be procured through normal Agency
procurement channels by  Agency personnel.

      Furth-.:.-  the contractor will set up, configure, troubleshoot and
repair computer equipment on ar as needed basis. Due to the infrequency
of this occurrence, FORMAL WC riK REQUEST SYSTEM procedures will be
followed. Customary PC and LAX repairs and troubleshooting are
expected to be performed under this delivery order. Computer equipment
requiring extensive, specialized or proprietary repairs will not be
performed without prior approval by the delivery order project officer.
Supplies or parts necessary to perform any repairs will be first procured
through existing contracting mechanisms (by EPA staff) and then (if
customary channels do not exist) by the contractor. One criteria on how the
parts  will be procured will be determined by comparing the cost of buying
through contractor vs. Agency/GSA channels and the speed with which a
repair can be made. Due the the nature of our operations (critical
operations related to environmental enforcement), speed of repair will be
given  more eight than the  cost when comparing the potential source of
repair parts and service.

Deliverables:      7a    Current and Amended ACI catalog
                 7b    Monthly List of Needed PC Supplies
Task &     Maintain CRL's PC Inventory

      The Central Regional Laboratory PC Inventory is designed to track
specific hardware and software articles on CRL PC equipment (LAN items
are included and are inseparable from PC only items).  This inventory
augments bu t is separate from the Property Inventory maintained by the
Property Custodians.  The contractor therefore is charged with the te  : of
maintaining a current and accurate reflection of CRL hardware anc
software distribution.

Deliverables:      8     Maintained CRL PC Inventory
    Computer Operations Support Service To Central Regional Laboratory, Region III
                               Page 6

-------
Task 9:     Develop and Maintain User Guides

      The contractor shall develop and maintain Users Guides for all
contractor generated software systems developed for CRL.  The user guides
must include basic information about eh developed system (date of software,
location of operation, system requirements, help features, purpose of the
software and how to use the software.)  Enhancements and corrections to
existing software will require documenting the changes and updating the
user guides accordingly.

Deliverables:      9     User Guide for each Software System
Task 10:   Produce In-house PC Newsletter

      The contractor shall provide PC Notes for distribution to CRL staff.
The intent of the PC Notes is to inform staff on subjects related to PCs and
microcomputers in general. The notes may be of original works of a
compilation of Agency, public or copyrighted documentation. In the event
the contractor chooses to use copyrighted material all copyright laws will be
strictly followed, the newsletter is intended to support the staff in using the
computer option available.  The newsletter may be provided in conjunction
with other EPA in-house publications (e.g., Infostnicture.) The publication
of the newsletter will be provided at least quarterly.

Deliverables:      10    Quarterly In-House Newsletter
Task 11:   Attend the Site Managers Meeting

      The contractor site management is expected to attend the annual
contractor site meeting in Atlanta, Ga. during the month of June,  the
purpose of this meeting is to enlighten the management on EPA policies
and goals. Information learned at this meeting will be used to effectively
implement these delivery order.
7.    DESCRIPTION OF DELIVERABLES

      la   Draft Project Plan
      Ib   Final Project Plan
      2    Completed Formal Work Request Form
      3a   Menu Driven System Software
      3b   System User Guides
      4    Modified On-line Operations Guide
      5a   Training Session Outlines
      5b   Training Materials
      5c   List of Attendees
      5d   Completed Course Evaluations
    Computer Operations Support Service To Central Regional Laboratory, Region III
                                Page?

-------
  5e    Summary of Course Evaluations
  6a    Standard Operating Specifications
  6b    System Manuals
  6c    System User Guides'
  7a    Current and Amended ACI catalog
  7b    Monthly List of Needed PC Supplies
  8     Maintained CRL PC Inventory
  9     User Guide for each Software System
  10    Quarterly In-House Newsletter
  A. Task 1 - Written plan •' livered within 10 days of receipt of
  Contract. The nature a*   intent of the work plan will be judged by
  the delivery order projec   .icer (DOPO) as to whether the task
  components have been
  B. Task 2 • The DOPO will ensure that all points in the FORMAL
  WORK REQUEST have been met. Principle analysts or staff
  members assigned to provide input on the creation or modification of
  existing software will be asked to review the delivered product to
  determine whether the product addresses the functional
  specifications outlined in the FORMAL WORK REQUEST. Upon
  concurrence with the principle staff the product will be accepted after
  a demonstrations of functionality.

  C. Task 3 - The DOPO will ensure that all points in the task have
  been met. Principle analysts or staff members assigned to provide
  input on the creation or modification of existing software will be
  asked to review the delivered product to determine whether the
  product addresses the functional specifications outlined in the
  FORMAL WORK REQUEST.  The system will be accepted upon the
  demonstration of functionality for a period of two months.

  D. Task 4 - The contractor will pride acceptable performance if the
  assigned  computer systems are maintained and operating within
  acceptable standards of operation. The contractor is expected to
  immediately report non-operational systems to the DOPO.  Failure to
  immediately (within 1 hour for severe or major malfunctions and
  within 8 hours for minor disruptions) report system malfunctions
  would lead to an unacceptable performance.

  E. Task 5 - Course evaluations by the class will determine whether
  the contractor has performed  with compliance and acceptability. The
  evaluation forms will r. e provided by the contractor.
Computer Operations Support Service To Central Regional Laboratory. Region III
                            PageS

-------
      F. Task 6 - The documents provided by the contractor will be
      evaluated by the QC officer and principle EPA staff members to
      ensure completeness and appropriateness.

      G. Task 7 - The DOPO will monitor contractor performance through
      the use of surveys of staff assisted by the contractor. The surveys will
      include a check on whether the requested system or help was
      performed in a timely  and thorough manner.

      H. Task 8 - The DOPO with the assistance of EPA custodial officers
      will periodically spot check the validity and accuracy of the inventory.

      I.  Task 9 - The DOPO  will ensure that the user guides meet EPA
      standards. Other EPA staff will be requested to review and comment
      on the documents where appropriate.

      J. Task 10 - The DOPO will ensure that the publications are provided
      on a quarterly basis. Quality of the information will be solicited from
      facility staff to assure that the information provided is acceptable and
      useful.
9.    SCHEDULE OF TASKS AND TlFTT .TVFTCART .Kg

                                             Weeks After
Taglc        TV»Hvt»rnh1«                          Award

1           Draft Work Plan
1           Final Work Plan
2           Completed Formal Work Request Form
3           Menu Driven System Software
3           System User Guides
4           Modified On-line Operations Guide
5           Training Session Outlines
5           Training Materials
5           List of Attendees
5           Completed Course Evaluations
5           Summary of Course Evaluations
6           Standard Operating Specifications
6           System Manuals
6           System User Guides
7           Current and Amended ACI catalog
7           Monthly List of Needed PC Supplies
8           Maintained CRL PC Inventory
9           User Guide for each Software System
10          Quarterly In-House Newsletter
    Computer Operations Support Service To Central Regional Laboratory, Region III
                                 Page 9

-------
10.   REPORTING REQUIREMENTS

      The contractor shall submit .standard delivery order reports due by
      the tenth day of the following month. The monthly reports will
      include graphic representation of percent of money spent to money
      available with an indication of when 60% of contract funds have been
      used.

      The contractor will meet on a bi-monthly (once every two weeks) basis
      to review contractor performance. The meeting will be held to
      ascertain the status of work in progress  and deliverables.

1 1.   LABOR MIX REQUIREMENTS/STAFF QUALIFICATIONS

          'The contract requires the use of a Site Manager that is
      experienced and has a demonstrated ability to supervise a small
      number of employees.  The manager must be able to rely on the
      contractor's support team for essential services such as time keeping
      and programmatic support. Three years of ADP experience is
      required. Knowledge of LAN operations, small minicomputer
      operations are essential.

           The manager must be assisted by  an in-house support team of
      computer experienced individuals. Since experience on computer
      systems are extremely time sensitive the following additional
      requirements have been identified: Individuals supporting LAN
      applications or tasks must have at least one year of LAN -
      programming, design, or analysis experience within the past 15
      months. Experience with Novell's Netware 286 version 2.15 is
      required. Individuals supporting the LIMS system must have at
      least four years of computer related experience and at  least two years
      of Perkin Elmer Concurrent LIMS experience within the last 12
      months.

12.   ESTIMATE OF STAFFING BY TASK IN LABOR HOURS

                                 HmmhyTaak
                       123456789    10  11
Site Manager IV

Technical Project Leader

Senior Systems Analyst

Data  Analyst

Database Management Systems

Specialist
    Computer Operations Support Service To Central Regional Laboratory, Region HI
                               Page 10

-------
Senior Computer Specialist

Technical Writer

      Total
13.   SPECIAL AREAS OF CONCERN

           As with contracts of this type and scope the delivery order
      project officer must protect against the appearance of personal
      services.
14.   SECTIONS OF CONTRACT SCOPE OF WORK AUTHORIZING
      THIS WORK

      This work is authorized under Attachment A of the TOSS contract as
      follows:

      Task 1 - Section 2.0
      Task 2 - Sections 3.8 and 3.6
      Task 3 - Sections 3.8 and 3.6
      Task 4 - Sections 3.1 and 3.5
      Task 5 • Sections 3.6 and 3.7
      Task 6 - Section 3.8
      Task 7 - Sections 3.6 and 3.7
      Task 8 • Sections 3.3 and 3.1
      Task 9 • Sections 3.8 and 3.6
      Task 10 • Section 3.7
      Task 11-Section 3.1
    Computer Operations Support Service To Central Regional Laboratory, Region III
                               Page 11

-------
      Proposed Budget for Computer Operations Support Service to Central
                         Regional Laboratory, Region ffl
Budget (1/1/91- 7/1/91)
Technical Operations and System Support

1.    Technical Labor Hours

Position                     Rate           Hours	Coat

SiteMngr. I               $2931            150        $4,396.50
Senior Sys. Analyst          37.99            585        22,224.15
Programmer Technician     13.17           1280        16357.60
Lab Auto Specialist          24.62           1280        31,513.60
LAN Specialist               22.47            100        2,247.00

Tech Labor                                            $77,238.85
5.5% Program Management                             44248.14
Other Direct Charge                                     4,500.00

DELIVERY ORDER TOTAL                            $8538639
    Computer Operation* Support Service To Central Regional Laboratory, Region III
                               Page 12

-------
MEMORANDUM
SUBJECT:  Statement of Non-duplication of Effort
FROM:  John Doe
       CRL (Mail Code 9398)

TO:  Pat Garvey
     Project Officer


I have determined that the work being ordered under Contract 68-wo-
0043  for computer  operations support  services for  the  Central
Regional Laboratory in Region III does not duplicate any previous
work efforts of our office.

-------
             UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                          WASHINGTON, D.C. 20460


                             UJN loai
                                                          OFFICE OF ENFORCEMENT
MEMORANDUM
SUBJECT:



FROM:

THRU:


TO:
           Justification of need  to  Furnish Property to
           Computer Sciences Corporation,
           Contract No.  68-WO-0043
           Doe,
                          Delivery  Order Project Officer
           Clarence Dade,  Contract Property Administrator
           Facilities and  Support Services Division (PM-215)

           Harry Schlosser,  Contract Officer, Procurement and
           Contracts Management  Division  (PM-214-F)
     In accordance with Chapter  5 of the Contracts Management Manual, a seven-
point justification to furnish property to Computer Sciences Corporation under
Contract 68-WO-0043 Delivery Order 000 follows:

     1. This project provides technical  and  operations support for  -s Office
of Federal Facilities  Enforcement (OFFE).  including operations, maintenance and
enhancement  of  the Federal Facilities Information  System  (FFIS) and the Federal
Facilities 'racking System (FFTS).  This configuration is  needed to complete the
scheduled  enhancements to FFTS.   This configuration will be  used  to support
software development,  system documentation, mainframe communications, and data
transfer fc>- the National  FFTS data base.

     2. The  items to be 'urnished can be contractor acquired through a purchasing
agreement.   A quote fo- the above  options  are listed below,  one  from a retail
vendor (whirh includes onsite maintenance):
ALR Business YEISA 386/33 Model 101

Sony 1.44 MB 3.5" Floppy

NEC SuperVGA Monitor w/VGA card

120 ME Hard Disk

Mountain 80 MB Tape Backup
                                                           $ 1700

                                                               70

                                                              680

                                                              490

                                                              250
                                                                 Proud on Rtcycitd Papir

-------
     Intel 80387-33 Math Coprocessor                          54.0
     2400 Baud External Modem                                 170
     4 MB Additional RAM                                      224
     Logitech Serial Mouse                                    100
     MSDOS 4.01                                                92
     EMI/RFI/Noise/Surge Protector                             45
     Onsite Maintenance                                       175
     4 Boxes 1.2 MB 5.25" Diskettes                            40
     2 Boxes 1.44 MB 3.5" Diskettes                            30
     3 80 MB Tapes                                             75
     Miscellaneous Cables                                      70
     Taxes                                                    214
                                           Total	      $ 4965
     3. The equipment is required in order to perform the services described in
the Statement of Work for Delivery Order 020 under Contract 68-WO-0043.
     4. It is in the best interest of  the Government to allow the Contractor to
purchase  the  equipment on behalf of  the government with  direct cost  to  the
contract since the equipment will continue to be used by the Office of Federal
Facilities Enforcement.
     5. The equipment described above  will  be located at:
        Computer Sciences Corporation
        Software Services Department
        6565 Arlington Blvd
        Falls Church. Va 22042
     6. In house excess equipment is available: 	 yes   X   no
                                 •   ^
                       f  '           '
        Concurrence:   V^i >---»'•  ^  --^	Date:	^_
                    Clarence Oade
                    Contract Property Administrator
                    Facilities and Support Services Division

-------
     7. The cost -f the equipment is approximately 54,965, which ir-.lude
maintanience  for the  first year.   Lease  of the  same equipment  ",
approximately $789 per month or $9,468  per  year".

     The purchase of the equipment will provide for the ongoing needs
the Federal Facilities Regional Coordinators  (FFCs). as  well as OFFE.

     Please allow the Contractor to purchase the equipment as Contractor ft
Property.
                  **&
   Concurrence:   '*k -w^g^** •• /^^T/%^./^^,  Date:
                 Bruce Rothrock
                 Senior Information  Management  Officer
Concurrence:
                  13 /4~vLs
                          l
Brenda Daly
Project Officer
                                Date:
   Concurrence:
                 Larry Schlosser
                 Contract Officer
                               Date:
Attachment

cc: Mike Kurgan
    Lyn Burcnfielc .CSC)
    Dro Der Minassian

-------
              RATIONALE Wt BSUANCE OP A CHUNG PRICED DfUVEKT ORDER
CONTRACT NUMBER,
                          FAIT I • IDENTIFYING ^FORMATION
                          JO - &041> _ DELIVERY ORDER NUMBER ' m3>
DELIVERY ORDER TITU
                      MtAijtar O ftir-»*.V% CR (PROVIDE SUPPORTMG NARRATIVE BELOW).
                                  PART • - SIGNATURES
                                                              A

-------
   APPENDIX C
    Appendix C contains a blank copy of all the forms used during
the Delivery Order process. They include:

    •    Rationale for Issuing a Ceiling Priced DO

    •    Procurement Request - Form 1900-8

    •    Designation of Delivery Order Officer
         -Form 1900-65

    •    DO Statement of Work Review

    •    TOSS SOW Review Checklist

    •    Contract Deliverable List

    •    Project Plan Approval Form

    •    Request for Brief or Brief Support

    •    Contractor Performance Review
TOSS User's Guide        August.1991                 C-I

-------
              RATIONALE POt BSUANa Of A CBUNO PRJCEO OOJVDTf ORB  I
CONTRACT NUMBER
 PAKTI • DINTIFYMe MPOIMATION
	OBJVERY ORDER NUMBER
DEUVERY ORDER TIM
DEUVERY ORDER PROJECT OFFICER (DOPO),
PROJECT OFHCER	
                              PHONE,
                              PHONE
                      PART I • UTIONAlt (CHECK APFROMUA1I BOJQ
           DEVELOPMENT OP SYSTEM CONCEPT OMENTED PEASHflY SIUDCS
           P6VBOPMENT OP PUNCTIONAL RgOUBEMENTS DOCUMtNT Ot DESIGN SPtORCATONS
      I  I  OW5OING SYSTEM MANTENANCE AND MNOR ENHANCEMENTS
      [""I  CONTRACTOR MANAGEMENT SUPPORT. E.G^ BENTfCATION OP OPPORTUNmES POR
           IMPROVEMENT OP MPORMATION SYSYTEMS MANAGEMENT; RESOURCE OPTIMIZATION
                IPROVIDE SUPPORHNG NARRATIVE laowj.
                                  nutr •

-------
             Procurement
            RaquaM/Ordar

                    L
                                                       ii.

                                                •tea »imm,mmm

                                                Dfm  CU.
                                  it. ^

                                           IMMVI9
                                     Da.
                                     Uk.
                                        Do-
ITTUMMft

-------
                        Designation and Appointment of Project Officer/
                       Work Assignment Manager/Delivery Order Officer
                                      (For Othar Than Small Purehatatt
      Note: This form is not a Contracting Officer ^warrant Delivery Order Officers and Administrative Delivery
      Order Officers require a warrant of Contracting Officer minority. Any request for a Delivery Order Officer
      warrant must be accompanied by the additional information required in Chapter 8 of the Contracts Manage*
      mem Manual.
  c. organuaiion
                         a. Man COM
                                                                         tun of Comrvei Euorionca
                                                                       I
  2 rht nomination it lor

      D Proton OM«w
      D wor.Wn^tM.n.0,
      D OohMfV Ofdor Offieor

      a —,^^0^
      U OolNOfV OnMr •r^oa ONwor
                             3. Thol

                               •. ComoMnd aw OOM Proioci Offietr Courao

                               o. Comototod mo Contract Aommmrauon Courto   Q
                                                   d. if mo
                                                                tnoteomoMMtf
                                                    ioa Ofhcor Couno or tnoXomroa Ao
                                                    moon COUTM. nw • wonror
             a
             Q
             a
                                                       Mb****   a    c
                                                   It MM oniww m mm o. a. or e « "Mo." or IM*
                                                   wwwor n «rom ff i* "Mai ~ MTWM wi
 4 EliimitM Ooiur Amount ol ConirtCL Wi
                    . or Oolrawv Oraor
 9 Nomination n tor rC/wct ontr

     D,,
         ROW comrocii WMA auiojftmofK* or i
        • eMno* m mo "torac! Ofheor.
                                           r on Contract No.
                            MO./I
       The undersigned nominee and requesting official certify that the designation of. this
       nominee complies with the workload limitations and other requirements set forth in
       Chapter 7 of the Contracts Management Manual.
60 feonaturoot
                                                          0.0m
7a S<9notwroo<
Ofhooi
cOato
                                                rido
                                                          e.0«o:
••A

-------
   •TO II USD IT MKS/PQD OUT*
                     _ GDNIUCTNO...
                      OCTO/WAM
OO/WANO.
 i. M icws ounn nc HOK OPIIC OONIIACI i
                                                            EHBM:
_«. DC iOWGDMIAM BEMMS BMTffD AS PMMMB IT AIKOMMT
  V OF M AOM»gTUTer» 4/17/fO MtMntAfTI IK VJUCf XOKIUgMS AT gKk*
               >TOn»tt»IOTPATUO
-------
 DOPO:	                  DO #:	

                            TOSS  SOW Review Checklist  •

 Your  Statement  of  Work  is  inadequate  in  the  following  areas:
 1.  Title
 	Is inappropriate  in  the  context of the scope  of  work.
 2.  Period  and  Place  of  Performance
       .Deliverable  due  dates  are outside the  period  of  performance.
       .Period of performance*  is not  within the  fiscal  year.
 	Work site (EPA  location or contractor site) is not  stated.
 3.  DOPO   and  Alternate  Information
 Missing  for	  DOPO  and/or	Alternate  DOPO:
 	Name,  	address. 	mail  code. 	FTS  and 	commercial  telephone
 numbers, and  	Email number
 4.  Project  Background
       .It  is  not clear how this  project  fits in your  organizational  mission.
       .Other related  (past,  present, and  planned) efforts   are not  described.
       .Referenced  systems  are  not defined or described.
 5.  Purpose
       .Is  not clear.
       .Does  not  flow logically  from  the  project background.
 6.  Task  Descriptions
      .First task is  not  the  development of a  management  plan.
      .Requirements  of  the  management  plan are  not  outlined.
      .Tasks	 not sufficiently  defined  to allow contractor  to work  independently.
      .Are not within the contract  scope  of work.
      .Task!	  are  inherently   government  functions.
The  following  taska require  these additional  revisions:

-------
 7.   Description  of   deliverables
 	  Are  not clear  and  understandable.
 	 Do not relate to -specific tasks.
 8.   Acceptance  Procedures   for  Deliverables
 	  Criteria for acceptance are not  provided.
 9.   Schedule   of  Tasks  and   Deliverables
         Schedule is not within the period  of  performance.
         Deliverables are not  included in  the schedule.
        Specific due dates are not given.
        Schedule is  not realistic.
 10.   Reporting   Requirements.
        None  are  provided.
         No  reporting schedule  is provided.
         Required contents  of written  reports are not specified.
 11.  Labor  Mix  and  Estimate  of  staffing  in  labor  hours.
         Labor  mix requirements and  staff  qualifications  are not clearly  stated.
        Clearances  have not  been addressed.
 12.  Estimate  of  Staffing  by  Task  in  Labor Hours
        Labor categories and estimated  hours for each task are not  given.
        Labor categories are  not  valid.
 13.  Special   areas  of  Concern
         Personal services.
        Conflicts of  interest.
        Activities  prohibited  by  the  Administrator  are  included.
        Activities  listed as  "vulnerable" by  the  Administrator  are  included.
        Vulnerable  activities  do  not  indicate  the  necessary control  measures.
 14.  Sections   of  contract   Scope  of  Work   Authorizing  the  Work
	 Specific sections or  subsections are not referenced.
Additional  requirements   to   make  this  SOW  acceptable:
'  See TOSS  User Guide for specifics on preparation of a SOW

-------
                                 fcONTRACT DELIVERABLES LIST
                                 	        OO/WAMflOt
rim*
                                                                         MHI
   T»
                                       DO TMK
                                                                         OOlt
  TO
  NMD COPT-

  IMOC1K
          11/4 WW

          • 1/4 INN
at/tiov
31/tMON
         II/41MT

         II/4MMI
11/tlMV

• I/IN

-------
CONTRACT MMO*
CaflMIMMMMOi
                                         fcONTRACT DELIVERABLES LIST
                                        	         M/WAHMBfc
         TO.
                • I/410W

                I 1X4 MOM
J I/SLOW

31/aHON
                                                                                   OA1CHC
                                                                                   I         I
                                               00 TMKI
                • I/4UW

                11/4 MOM
1 I/SIM!
* is*MONO
                         DATCMK  \_
        TO
                • 1/41

                • 1/41
• l/ll
                                                                                    MIEDtC

-------
                        PROJECT PLAN APPROVAL  FORM
 Part 1 - Overall Approach

 A. Does the contractor demonstrate a complete understanding of all
    project elements?

 B. Has the contractor identified and supported all of the assumptions
    underlying its approach?

 C. Has the contractor identified all questions and problems which will need
    to be resolved as well as the manner in which they will be resolved?

 Part 2 - Staffing Plan

 A. Does the staffing plan provide personnel qualified to perform the SOW?


 B. Is the labor mix appropriate?


 C. Is the proposed level of effort realistic?


 D. Are the labor rates those contained in the contract?


 Part 3 - Subcontracts (for Each Subcontract Proposed)

 A.  Does the Project Work Plan specify what portion of the SOW will be
    subcontracted?

    (1) Does the staffing plan provide personnel qualified to perform
       the SOW?

    (2) Is the labor mix appropriate?


    (3) Is the proposed level of effort realistic?
    (4) For those subcontracts approved for use under the contract,
    are the labor rates those contained in the contract?

B.  What is the level of subcontracting?

    ( )<10% OF ESTIMATED COST
    ( ) 10% -29% OF ESTIMATED COST
    ( )>2S% OF ESTIMATED COST

C.  K the contractor has proposed more than 25% of the estimated cost in
    subcontracts, is there too much subcontracting? Can the contractor
    retain adequate control over the project?

Part 4 - Other Direr*
( )YES   ( )NO
( )COMMENT ATTACHED

( )YES   ( )NO
( JCOMMENT ATTACHED

( )YES   ( )NO
( )COMMENT ATTACHED
( )YES   ( )NO
( JCOMMENT ATTACHED

( )YES   ( )NO
( JCOMMENT ATTACHED

( )YES   ( )NO
( )COMMENT ATTACHED

( )YES   ( )NO
( )COMMENT ATTACHED
 )YES   ( )NO
 )COMMENT ATTACHED

 )YES   ( )NO
 )COMMENT ATTACHED

 )YES   ( )NO
 )COMMENT ATTACHED

( )YES   ( )NO
( )COMMENT ATTACHED

( )YES   ( )NO
( JCOMMENT ATTACHED
A. Does the level of ODCs exceed 10% of the total estimated cost of
   performance?
( )YES  ( )NO
( JCOMMENT ATTACHED
( )YES   ( )NO
( JCOMMENT ATTACHED

-------
 B. If 4.A is a yes and you concur in the proposed ODCs. attach an appro-
    priate justification (unless this was done prior to issuance of the DO). •

    ( )CONCUR, JUSTIFICATION ASTTACHED
    ( JCONCUR, JUSTIFICATION PREVIOUSLY SUBMITTED
    () NON-CONCUR. COMMENT ATTACHED

 C. Is the amount of travel reasonable?
 D. Has the contractor proposed any training for its personnel (remember,.
    the contractor is required to provide fully qualified personnel)?

 E. If 4.D is yes, what is the nature of this training?

 Part S. Schedule

 A. Has the contractor taken exception to the EPA's delivery schedule?


 B. Are the proposed milestones supporting the deliverables reasonable?
C.  Do the delta-rabies specified in the subcontracts, if any, support
    deliverable? required by the prime? Do they provide for adequate
    leadtime where they are to be incorporated into the prime contractor's
    deliverable.

Part 6 • Oner Areas of Concern

A.  If this is a fixed price DO, has the contractor identified any contingent
    costs?

B.  If 6.A is yes, v.tat what are the contlgent costs and what can be done to
    reduce or eliminate the contigency?

    ( )CONTIGENCY CAN NOT BE REDUCED OR ELIMINATED

C.  If this application has privacy concerns, have these issues been
    adequately addressed?

D.  If this application has CBI concerns, have these issues been adequately
    addressed?

E.  If this appflcaflon has conflct of interest concerns, have these issues
    been adequately addressed?

F.  ff this appflcadon has work areas identified In the Attachment's'of the
                           i (See      of the manual) as Vulnerable",
( )YES   ( )NO
( )COMMENTATT/

( )YES   ( )NO
( )COMMENTATT/

ATTACH COMMEN
 )YES   ()NO
 )COMMENTATT/

 )YES   ( )NO
 JCOMMENTATT/

 )YES   ( )NO
 )COMMENTATT/
    have the Issue* relating to the identification of an audit trail regarding
    opinions and recommendations offered by the contractor been
    adequately addressed?
                                                                    ( )YES   ( )NO
                                                                    ( )COMMENTATT,

                                                                    ( JCOMMENTATT,
                                                                    ( )YES   ( )NO
                                                                    ( )COMMENTATT

                                                                    ( )YES   ( )NO
                                                                    ( JCOMMF'TATT

                                                                    ( )YES   I )NO
                                                                    ( )COMMENTAT1

                                                                    ( JYES   ( )NO
                                                                    ( )COMMENTAT1
TYPED NAME, TITLE. AND SIGNATURE OF DOPO
             Jt

-------
                           CONTRACTOR  PERFORMANCE  REVIEW
                                          Questionnaire
 Contractor:                                  -    Contractor No.:	
 DOPOName:    	    Delivery Order No.  	___
 Timeframe:      __________________

 PROGRAM  MANAGEMENT:
 1.    Has the Program Manager/Assistant Program Manager provided sufficient overnight of the project?
                More than adequate	   Adequate	   Inadequate	
 2.    Has the Program Manager/Assistant Program Manager managed subcontractors ffecttvety?
                Wefl managed	   Adequate	   Poorly managed	
 3.    Has the Program Manager/Assistant Program Manager been actively involved In problem detection and
      problem resolution?
                Actively involved	  Not involved	
 TECHNICAL  LEADERSHIP:
 4.    Has the Technical Project Leader demonstrated an understanding of the technical requirements of the
      project?
                Sound understanding	   Average understanding	
                Deficient understanding _____
 5.    Do the project plans contain a technical approach, a management approach and project controls?
                Yes. all three	  Two of the three	  Just one	
 6.    What is the quality of the overall schedule?
                Too ambitious __   Appropriate	   Too generous	

 STAFFING:
 7.    Have the quilflcattons of assigned staff matched those of me needs of the project?
                Always	  Sometimes	  Very seldom	
8.    Have recruitment methods resulted in timeliness of staff assignments?
                Always	  Ganeraly	   Very seldom	
9.    is there excessive turnover of staff?

-------
 DELIVERABLES:
 10.   Are delrverattts produced on time?
               /Hwjn_^_  Generally __^
 11    what is me qua«y of durables?
               Complete and thorough	  Adequate __  Poor.
 REPORTS:
 12.   Are contractor progress reports:
               Timely?                Yes	        No	
               Accurate?              Yes	        No	
      Do they:
               Identify problems?"      Yes	        No	
               Recommend solutions?   Yes	        No ___
 13.   Are financial reports:
               Timely?                Yes	        No	
               Accurate?              Yes	        No	
      Do they reflect:
               Expenditures to date?    Yes	        No	
               Identification of ODC's?   Yes	        No	
               Conformance with cost    Yes	        No	
                  projections?
INVOICES:
14   Are monthly vouchers received routinely?
               Always	   Sometimes ___   Never	
15   Are charges properly supported with documentation?
               Always ^_^_   Sometimes ^^_^

-------
  APPENDIX D
   Appendix D contains Attachment A of the Statement of
Work from the TOSS contract.
TOSS User's Guide      August, 1991          D-l

-------
3.0     Scope.   This contract will provide the IRM technical and
operational computer systems support required by EPA's Headquarters
Program Offices, Regional Offices, Laboratories, and other Agency
sites to meet EPA's  mission.  EPA has other XRM-related contracts
vhich  may be  the preferred vehicle for  some areas  of  support
services  included in this  contract._  These  contracts will  be
indicated in the appropriate section.

Service areas covered by this contract include:

        o   3.1  Facilities  Management/Operations Support;

        o   3.2  Document  Processing,  Publication, Graphic,  and
                 Micrographic support!

        o   3.3  OA  and Records Management;

        o   3.4  Telecommunications Support;

        o   3.5  LAM Support;

        o   3.6  Microcomputer/Personal  Computer  (PC)  Technical
                 Support;

        o   3.7  Information Center Support; and

        o   3.8  Applications/Systems Development Support.

3.1     Facilities Management/Operations Support.  The contractor
shall provide  facilities  management and  operations  support  at
various facilities throughout the Agency, to include operation and
management of the various facility computer centers. This contract
may be used in addition to the national  contract  at a local level.
EPA does not intend that this contract be the only  support for its
facilities management and  operations requirements.  EPA utilises
other contracts as preferred sources for support of selective re-
quirements and may expand their utilisation in the future.

-------
Within the  scope of Facilities Management,  and  when direct
specific task delivery  order,  computer operations servie
include, but not be limited to:

        o   Computer Room Support.  The contractor shall -ens
            clean,  safe,  and  orderly environment  is maint
            within computer room and data preparation areas re
            to ongoing delivery order tasks.  The contractor
            also order computer supplies as specified by indiv
            delivery orders.

            The contractor shall control the  flow of data v:
            the computer center. This includes, but is not lii
            to, review  of  regularly  scheduled  IRM system prc
            runs for abnormal  job endings (ABEND); notifyinc
            EPA Delivery order  Project Officer (DOPO) of all AX
            and the action  taken  to  eliminate  the cause of t
            ABENDs; when requested, notifying system users of
            completion  or problems;  distributing  system  ou
            reports via U.S. mail or through distribution to
            bins for local user pickup; development of proeed
            for computer jobs assigned to the computer center
            production  basis;  maintaining production schedu
            performing regularly scheduled quality control ch
            of work produced by computer  operations personnel;
            output  administrative  functions  (e.g., photocopy.
            binding, booking, bursting, microfilming, and de|   :
            ing reports).

            Contractor provided computer operators shall pro<
            all data according to established, documented prc
            dures or detailed written operation instructions i
            mitted with  a delivery order, specific  job  or,  i
            task  involves  a production  run,  by  procedures
            instructions contained in the manual or  job runshe«
            Additions, deletions, and changes to procedures si
            be specified by the EPA DOPO.

        o   Controlling  and Monitoring the  Computer Systems
            Hardware.   The  contractor shall  operate EPA compi
            systems and associated hardware according to polic
            and procedures specified in approved delivery orde
            The contractor's operations  staff's  technical pro
            eiency shall be at  a level consistent with resolut
            of basic system-related computer  hardware and softw
            operations problems.

        o   Data  Entry/Data Management.    The  contractor sh
            provide data entry/data management services  as spe«
            fied by individual  delivery order.  This shall inclu*
            but not be  limited to,  entering data into  automai
            tracking systems or databases, maintaining data fill

                                8

-------
    and producing system-generated reports.
    If a data  error is noted by the data entry operator,
    and if  a correction can  be readily accomplished; it
    shall be corrected,  otherwise, the  record  shall be
    flagged  for  update* after a  detailed  analysis of the
    problem.

o   Machine  Edit.   The contractor shall, as  part of any
    software  development  support,  include  programming
    capability  to  perform -automated   data  entry  edits
    wherever possible  (e.g., comparison  of input  to an
    established table of acceptable data;  and checking for
    alpha, numeric, or alpha/numeric data input).

o   Data  Analysis/Verification.    The  contractor  shall
    analyze  and verify data  entry items  according  to
    established delivery order criteria.

o   Database User Support.   The contractor  shall provide
    database user support  through background information
    analysis;  data  searches; data retrieval  and report
    assembly; support for ad hoc projects;  and provision of
    hardcopy and micrographic  reporting  through on-line
    retrieval  techniques.    The  contractor  may  also  be
    required to assist in analysis of database contents and
    data-access techniques.

o   system Hardware Logistical  support.  The contractor
    shall  perform  logistical  services  which  shall  be
    limited  to functions such  as diagnostic  testing of
    software; addition or exchange of externally eonneeted
    accessories; installation and replacement of internal
    circuit boards,  batteries, and disk drives; and attach-
    ment, relocation, or detachment of  cabling.   These
    services shall exclude functions such as replacement of
    chips,  resistors,  and  straps  on  a board;  making
    mechanical  printer  adjustments;  and  equipment  or
    component  customization  or  alteration  which  would
    permanently change a unit relative to  a manufacturer's
    design or originally intended function.

    The contractor shall notify  the EPA  DOPO when existing
    EPA maintenance contracts are required for depot level
    repair or replacement of  system-related hardware.  The
    contractor shall disconnect such hardware, arrange to
    transfer it to a depot maintenance site, and reinstall
    it once a repaired or replacement unit is received.

o   Managing Tape and Disk Resources.   When  directed by
    delivery order, the contractor shall  manage  tape and
    disk resources.   This  includes providing incremental
    and full  system backup  tapes and  the  operation and

-------
            maintenance of a magnetic tape and/or disk library in
            support of uninterrupted computer operations'.  Library
            operation  includes,  but is not  limited to,  storage,
            distribution, cleaning, degaussing, and filing.

            Record  Keeping.   The  contractor shall  maintain all
            records related to IRM systems involved vith an auth-
            orized delivery order task.  Records include, but are
            not limited to, downtime logs, sy tern activities log,
            hours of operation,  equipment malfunction log, daily
            task sheets,  spool unload  tape log, stand-alone dump
            log, and data management logs. EPA will inspect these
            records at least quarterly.

            Reference Library.   The  contractor  shall maintain an
            organized reference library of all manuals and guides
            necessary to assist agency  and contractor personnel in
            the operation of EPA IRM systems.  The library shall be
            located at EPA facilities.
3.2     Pyffyfflant Processing* Publication . Graphic* and Microcrraphic
Support.  The contractor shall provide document processing, publi-
cation, graphic, and micrographic support as directed by individual
delivery order.  The contractor  shall provide personnel capable of
producing high quality, effective visual communication tools used
for management  presentations  (e.g.,  speeches,  meetings, training
courses, and public display and  special exhibits) , and publicati
of documents  (e.g., research papers and users'  manuals).

Support services may include, but are not limited to:

        o   Operation of Data  Plotting Equipment.  Includes, fcjt is
            not  limited to,   cleaning  equipment and  loading the
            plotting fluids,  inks,  paper, toner,  and pens; receiv-
            ing and mounting  plot  data tapes;  identification and
            labeling of plots; storage of plot output and plot fiat a
            tapes; and the keeping of plot usage/ jobs records .

        o   Analysis of  graphic Meeds.  The contractor shall be
            able to provide computer graphics expertise including
            interfacing  of graphics to  mainframe  systems,  wit I
            particular emphasis on Geographic Information System:
            (6IS),  PCs,  and  workstations;  however, eonsiderabli
            emphasis will be on development and  implementation o:
            GI8.  This includes recommendation of graphic presenta-
            tion styles.

            The requirement to  write programs  producing origina
            graphics will range in  complexity from the very simpl
            to those requiring the production of interactive,  higl
                                10

-------
resolution, color graphical displays on various term-
inals and workstations.

Graphics and operating software will include IGL, GDDM,
other graphics software, DOS, UNIX, and other operating
systems.  Knowledge of ARC/INFO software, its operation
in DEC and PRIME environments,  and operation in PC and
workstation environments is desirable.  Programs must
incorporate the ability to drive these machines from a
host with original  software having multiple graphic
features  (e.g.,  local  display lists, segment  image
transformations, multiple surfaces and views,  color
blending,  and  3-dimensional   imagery with realtime
graphic rotation).   Developed  graphics  programs must
display data  and accept input  using full-screen (IBM
3270) protocols, requiring the vendor to  use the IBM
Graphics Display Manager program and XSPF.

Additional program requirements include production of
plots using  noninteractive equipment  such as CALCOMP
plotters.

Printing of  Documents.   When  delivery orders require
production  of camera-ready  copy, for printing,  the
contractor  shall prepare  documents  in  a  style  and
format  consistent  with  Federal  standards  and  as
described in the applicable delivery order.  If there
are no directions to the contrary, camera-ready copy
shall be submitted unbounded on 8-1/2" x 11" paper and
include as a minimum a  title  sheet, index, reference
section, and,  if applicable,  figures, tables, appen-
dices, and other illustrative materials.

Printing documents may require  use of  normal, bold, or
italic type; portrait or landscape text page position-
ing; the use of subscripts or superscripts; and Greek
and math  charactersets  in  any of several typefaces
(e.g., Letter Gothic, Pica, and Elite).

Documents Processing.  Documents processing includes,
but is not limited to receiving, certifying, logging,
data editing, indexing, abstracting, paginating, separ-
ating, filing, microfilming, accessing, and the coding
of documents received or generated in response to EPA
regulations  or requirements.     Processing of unique
documents may require development of unique procedures
and methodology. Document processing  may  also include
the operation and staffing of a  reading room whose
primary purpose is to provide access to hardcopy refer-
ence material and microfilm files in support of review
or regulatory processes.
                    11

-------
Tbe contractor nay also be required to operate document
processing centers that receive, process, control, a:
organize data collected in response to EPA regulations
or requirements.  Functions  include  receipt and dis-
tribution of all mail and documents containing confi-
dential  business information  (CBZ)  or  other  staff-
generated classified  material; tracking  these docu-
ments; retrieving documents for users; mailing of CBZ
documents; typing, and telephone support; telefaxing of
documents; and document archiving/micrographic/optical
disk operations related to preparing  the documents for
permanent storage.

Micrographics.  The contractor shall provide archival
quality  microfilm,  microfiche or  microform  of docu-
ments, as specified  in each delivery order.  The micro-
graphics may include  document filming,  microfilm and
microfiche duplicating, optical disk scanning, document
bar-coding, hardcopy  production,   and maintaining an
archival master film file of all microfilm, including
associated indices.

General Art and Original Drafting.  Includes finished
art in black and white or color; and may include simple
line  drawing  to  full  color illustration  of complex
nature.  Black and white charts, graphs, and maps shaJ 1
include all of the basic methods (e.g., bar, line,
pie).  Callouts shall be set in type and striped 01.
the original.   (Computer graphics may have eliminat
the need for this.)  Unless otherwise specified, hana
lettering, Varitype, LeRoy, and similar lettering will
not be acceptable.  The contractor shall furnish the
original artwork for all figures or graphics, and the
original pasts-ups  of any oversized  tables, together
with reduced versions of these tables for inclusion in
the document.  The maximum image area for all text and
tabular material shall not exceed 7" x 9-1/2*', includ-
ing the page number.

Still Photography.  Includes  the  camera work for the
furnishing of  negatives, prints, or slides in black and
white or color, and other related  services.

Typing of Manuscript Copy.  Includes proofreading for
typographical errors; correcting errors,  and typing of
camera copy, as specified.  Typing shall be performed
on a PC or wordprooessor using the  most current version
of WordPerfect, or whatever WP package is specified in
the applicable delivery order.  Floppy-disks shall be
returned to the originator if requested.
                    12

-------
Checking and Martina Page Proofs,  includes, .but is not
limited to,  tasks sucb as  checking  corrections from
galley proofs; placement of illustrations, legends, and
captions; page make-up, folios, and running heads; add-
ition of page numbers to contents  and indexes; and the
preparation of instructions to the printer.

Mechanical Editing.   Includes  close  reading of manu-
script to ensure correct grammar, spelling, and punctu-
ation;  consistency  of  capitalization, spelling  and
hyphenation; verb and subject agreement; agreement of
pronouns; correct adverbs and adjective use; beginning
and ending quotation marks and parentheses; correct use
of ellipsis; and many other details of  style as speci-
fied  in the  Government Printing  Office  (GPO)  style
Manual;  crosschecking contents with  text  to  verify
accuracy and consistency of heading,  subheadings, and
page numbers.

Substantive Editing, involves,  but is not limited to,
rewriting  or  reorganizing  sentences,  paragraphs,  and
sections;  arranging  or rearranging tabular material;
assessing illustrations to determine, the clarity of a
presentation, and the need for redrawing and retouch-
ing;  standardizing symbols; verifying  and  restyling
reference citations; crosschecking information in the
text to tables, figures, appendices, and references and
correcting apparent disagreements;  correcting inconsis-
tencies in format and style; rewriting as  needed to
assure tone and complexity  of document are appropriate
for  the   intended  audience;   writing  transitional
sentences where necessary.

Checking References.  Ensuring all references cited in
a document, and only those  references, are included in
the reference section of the document, and verifying
accuracy,  completeness, and adherence  to established
format.  In the event information  is missing, consult-
ing authors or procuring copies of cited material to
complete reference.  Whenever possible, references are
checked against original sources to ensure accuracy.

Proofreading.  Requires two (2) people crossreading,
one reading from the manuscript  and the other checking
the final  document  for errors.   Government-accepted
rules governing spacing,  spelling, division of words,
and other standards of good English shall be observed.
Proofreading  shall include assuring  consistency and
accuracy of  chemical formulae,  mathematical express-
ions, tables,  figures,  equations, chemical and bio-
logical  names,  and  other   technical  details of  the
document,  standard proofreaders*  marks shall be used.

                    13

-------
        o   Other Support Functions.  Includes, but is  not limited
            to,  performance of  other support  functions  such as
            reproduction,  collating,  and  assembling  into  'final
            publications.

        o   ••paatmia^tation.  The contractor shall develop and main-
            tain current documentation for all  Document Processing
            Center and Micrographics operations, including mainte-
            nance and standard operating procedures. Documentation
            updates shall be made at the time system modifications,
            enhancements, or additions are made.

3.3     Office Automation  (OA1  and Records Management.  EPA does
not intend  that  this  contract  be the only support for  its office
automation  (OA) and records management requirements.  EPA utilizes
other contracts as preferred sources  for support of selective re-
quirements  and may expand their  utilization in  the future.

The contractor shall provide OA  and records management  support.

This support includes, but is not limited to:

        o   File maintenance (automated and manual);

        o   Automation of office functions including requirements
            analysis  and  definition,  system  design,  software
            development  and maintenance,  and  the  development of
            system documentation and  operating  manuals;

        o   Maintenance of library collections  of books, journals,
            and micrographics at EPA  locations;

        o   Maintenance of  clearinghouses of information on special
            subject areas or initiatives of concern to  EPA to aid
            communications and facilitate technology transfer;

        o   Managing,  maintaining,  cataloging, retrieving,  and
            controlling acquisition/disposition of records; and

        o   Maintaining dockets  of official legal activities?.

3.4     Telecafm|Mi'>ication8 Technical Support.  EPA  does not intend
that this contract be the only support for its  telecommunications
technical support requirements.   EPA utilizes other contracts as
preferred sources  for support of  selective  requirements and may
expand their utilization in the  future.  EPA continuously reviews
the opportunities to update its  voice and data  telecommunications
configurations to optimize  system capabilities  through  advances in
digital technologies,  alternate vendor offerings, and opportunities
to reduce costs.  This contract shall provide  technical services
related to  voice and  data  telecommunications   support, including
technical assistance and advice on telecommunications requirements,

                                14

-------
and definition of new service specifications. The contractor shall
identify system needs, support requirements and problems, and shall
monitor the quality of system service to individual site locations*

Contractor support includes, but is not limited to:

        o   Routine system hardware and software problem isolation,
            evaluation, and resolution;

        o   Advising  the site  manager  and the  DOPO of  system
            problem areas  and .actions taken or  recommended  for
            problem resolution;

        o   Technical and operational assistance in the implementa-
            tion of major phases of new systems or substantial mod-
            ifications to existing systems or services;

        o   Installation, relocation, and deinstallation of voice
            and data telecommunications cabling (subject to local
            restrictions imposed by unions, building owners, 68A,
            municipal codes, etc...);

        o   Attachment, detachment,  and exchange of voice and data
            telecommunications cabling to workstations, servers and
            other ZRM equipment;

        o   Installation, modification, in-house relocation, opera-
            tion, and deinstallation of voice and data telecommuni-
            cations hardware;

        o   Assuring thorough implementation of both physical and
            data system security procedures;

        o   Providing EPA users with  assistance  (e.g.,  answering
            questions and suggesting solutions)  and training in the
            areas of voice  and data telecommunications purposes,
            uses, capabilities and operating procedures;

        o   Developing and  maintaining current  documentation for
            all systems standard operating procedures, operation,
            and maintenance  (Documentation  updates  shall  be made
           . whenever system modifications/enhancements/additions
            are made);

        o   Providing on-site technical support of EPA's data com-
            munications network,  to include data  switch,  multi-
            plexor, modems, and all interconnect lines;

        o   Developing and maintaining a telecommunications data-
            base inventory to include hardware and software;
                                15

-------
        o   Developing  and  maintaining  a  database  capahi
            mapping design needs; and

        o   Sending and receiving data via telefax.

3.5     IAN Technical Support.  An integral part of the agency
telecommunications effort, EPA continues to upgrade LANs open
at its Headquarters,  Regional Offices,  and Laboratory sites.
new LAN requirements  are  identified,  EPA shall initiate deli
orders to meet these needs.  The contractor shall provide techc
support services necessary  for the design  of LAN  hardware
software configurations and presentation of functional capabili
requirements, implementation, operation, modification,  and logi
cal support during the  LAN  life-cycle.   The contract will no
utilized  to  acquire  workstations or other LAN system compon
which may be available through EPA national contracts.

The LAN life-cycle consists of:

        o  Requirements analysis;

        o  Network design;

        o  Approval;

        o  Equipment ordering;

        o  Training;

        o  Installation;

        o  Acceptance;

        o  operation;

        o  Troubleshooting;

        o Modification; and

        o User support.

Contractor support shall include, but is not limited to:

        o   Routine system hardware and software problem isolatio
            evaluation, and resolution;

        o   Installation, relocation,  and deinstallation  of L
            cabling  (subject  to local  restrictions imposed
            ur .,ms, building owners, GSA, municipal codes, NDPD L
            Operational Policies, etc...);
                                16

-------
Attachment/ detachment, or exchange of LAN cabling to.
workstations, servers and other IRM equipment;

Installation, modification, in-house relocation, oper-
ation, and deinstallation of LAN-related hardware;

Familiarizing EPA personnel  with LAN purposes, uses,
capabilities and operating .procedures; providing user
assistance  and  training;   identifying  problems  and
recommending solutions to those problems;

Developing and  maintaining current documentation for
all LAN standard operating procedures, operation, and
maintenance.   Updates to the  documentation  shall be
made whenever system modifications/enhancements/addi-
tions are made;

Assuring thorough implementation of both physical and
data system security procedures;

Assisting  in  hardware/software upgrades,  including
requirements analysis and researching product availabi-
lity;

Providing  on-site  technical  support  of  EPA's LANs.
This includes all related hardware, software, and the
interconnect cables;

Evaluating systems capabilities against user requests
for new requirements. Make recommendations for system
enhancements and procedural changes.  Work with users
to define new requirements and perform initial system
design;

Developing and maintaining, a network database inventory
to include hardware and software;

Developing  and  maintaining  a  database  capable  of
mapping design needs;

Developing and  maintaining a  computerized  system to
transfer.  LAN  topology  through menu driven  access
screens for EPA LAN users;

Aiding backup and recovery management for LAN-related
software and data;

Helping  establish  a LAN  Administrator's group for
various EPA locations.   Provide information to these
groups on particular LAN requirements;
                    17

-------
        o   Helping establish  a LAN user group  a&d LAN bulletin
            board serving various EPA locations; and

        o   Development and presentation of user training for all
            EPA LANs.

3.6     Microcomputer/Personal Computer (PC) Technical Support.
The Environmental Protection Agency (EPA) accumulates large amounts
of data  at  the local. municipality, state,  and EPA Headquarters,
Regional Office,  and Laboratory ..levels.  This data is passed in
various  formats  (e.g.,  printed reports, computer  magnetic tape,
computer floppy  disk)  to the EPA National  Computer. Center (NCC)
located  at  Research Triangle Park in North Carolina,  and/or the
appropriate Program Offices at EPA's Washington D.C.  Headquarters,
and/or the Regional Offices,  for storage, evaluation, manipulation
(e.g. sorting  and  consolidating data),  and  production of reports
required for proper management and monitoring of EPA environmental
programs. -

There is an increasing agency emphasis on program offices* use of
local microcomputers to  process and manipulate  data  residing on
either NCC mainframe computers or on local office microcomputers/
Personal Computers (PC).  The PC is a component of  EPA's ZRM,
telecommunications, and LAN initiatives, and is able to provide a
cost and time-effective means for local data management which has
resulted in an uprc /ed overall EPA program response.

The contractor shall provide PC technical support services in the
areas of PC system hardware configuration and software design, in-
stallation, implementation, operation, modification, problem diag-
nosis and resolution, and related training.

Support includes, but is not limited to:

        o   Design  of  PC hardware configurations  and associated
            software application programs able to meet individual
            Program Office delivery order requirements;

        o   coordinating with the DOPO all PC system hardware and
            software repairs under  the  current depot maintenance
            contract;

        o   Installation, operation, modification, in-house reloca-
            tion, and deinstallation of  PC system related hardware
            (e.g., PCs, circuit boards, printers, modems, cables,
            disk drives,  and all associated multiplexing equipment)
            and software application programming;

        o   Development  and  updating  of  PC  software  program
            documentation;
                                18

-------
        o   Identification, diagnosis, and resolution of PC system
            hardware and software problems; and

        o   Development and presentation of user training for all
            EPA  PCs,  related  software packages,  and  individual
            Program Office applications.

3.7     Information center support.   EPA,  as a critical element of
an agencywide ZRN initiative, anticipates establishing Information
Centers at several remote  sites  listed in Section 3.9.   EPA pro-
motes end-user computing at its Headquarters, Regional office, and
Laboratory sites through this Information Center concept.

The contractor shall provide end-user computer support to EPA staff
at selected Agency locations during scheduled Information Center
hours.  Software  support and instructions shall  be given both in
formal classes  and  on a walk-in basis, and shall  include basic
computer applications, spreadsheet,  database, desktop publishing,
PC networking, graphics, wordprocessing and other technologies.

Information Center support shall include, but is not limited to:

        o   Operation of the Information  Center  Help Desk.   This
            includes answering  and tracking all calls, questioning
            callers to determine the area of expertise necessary to
            respond to their problems,  scheduling of appointments,
            ensuring call  follow-up,  and  maintaining a  Help Desk
            database;

        o   Organization and  conducting  agencywide training  in
            general use  of PCs,  electronic mail  (E-Mail),  major
            application/spreadsheet software packages (e.g., Basic,
            dBase Ill-f,   LOTUS 1-2-3, FOCUS,  and INFO);  and other
            selected software  (e.g., WordPerfect, Crosstalk, Pree-
            lance/Graphwriter,  and Sidekick).   Additionally, the
            logistics associated with training are also the respon-
            sibility of the Information Center support staff;

        o   Helping users  develop  their  own applications  using
            commercially available software packages (e.g., dBase
            III, Basic,  INFO,  FOCUS, and Lotus 1-2-3);

        o   Development and updating of training materials (e.g.,
            hardware/software user guides, classroom texts, auto-
            mated tutorials, and self-help instructional lessons);

        o   Assistance in the selection of appropriate hardware and
            software before  the  initiation  of  a  project (e.g.,
            mainframe vs. PC, and FOCUS vs. dBase III) in response
            to Agency and Program office IRM needs;
                                19

-------
Assistance with establishment,  operation, and enhance-
ment of Agency LANs;

Development and maintenance of a PC database containing
course-related data (e.g., tha course name, location,
date, and  student names  and phone numbers)  for all
Information Center training activities.  The database
shall be maintained on a realtime  basis  and reports
shall be made available as requested by the EPA Project
Officer or his designee;

Consultation service for analysis of agency and Program
Office physical and electronic security requirements,
including  determination  of  sensitivity of  data, and
identification of alternative solutions to identified
deficiencies;

Assistance in identifying Agency and Program Office IRM
support requirements,  and proposing automated alterna-
tives able to meet those requirements;

Development of selected PC-based software applications
in areas which could benefit several Agency organisa-
tions  (e.g., budgetary  and administrative  tracking
systems);

Producing reports from procurement and inventory data-
bases as requested  by the EPA  project officer or his
authorized designee;

Providing  technical assistance to  end-users  on the
transfer of files to and from PCs using Crosstalk  or to
and from an MCC mainframe using PCs equipped with IBM
3270 protocol emulation boards;

Assisting end users  seeking to install new equipment or
to move existing equipment;

Providing direction on performing  system backups using
local tape backup units;

Providing troubleshooting assistance  to help diagnose
software  and hardware  problems  concerning  the PC,
either solving the problem directly, or recommending  a
service call be placed if there is a  suspected hardware
malfunction beyond the capability  of contractor staff;

Development  and  maintenance of  an inventory  of all
databases developed;
                    20

-------
        o   Maintenance of a PC-based procurement tracking database
            containing  all  relevant procurement  identification
            numbers, dates, items descriptions, quantities, costs,
            and delivery/receipt  data.   The contractor  shall be
            responsible for prompt.handling of receiving reports,
            immediately  identifying  incomplete  or  unacceptable
            deliveries to the EPA Project Officer or his authorized
            designee.  The contractor shall also ensure conversion
            of information from the procurement database  to the
            inventory database is timely and complete; and

        o   Providing instruction to  EPA personnel in IRM system
            preventive maintenance procedures, including scheduling
            of backups of hard disks, establishment  of controls for
            the use of high and low density floppy diskettes, the
            periodic  cleaning of  equipment, . and  monitoring  to
            ensure necessary procedures are regularly followed.

3.8     Applications/Systems Development Support.   EPA  does not
intend that  this  contract be the only support for  its  applica-
tions/systems development support requirements. EPA utilizes other
contracts as preferred  sources  for support  of  selective  require-
ments and may expand their utilization in the future.  The contrac-
tor  shall design,  develop and/or implement application  systems
comprised of multiple software modules, or single purpose, stand-
alone software.

Services shall include, but not be limited to:

        o   Statistical Analysis.   The  contractor shall  provide
            technical services using mathematical,  statistical and
            ZRM-related  skills  to  review  requirements for  data
            reduction and  analysis,  to  apply statistical methods
            and standard software packages, and for development of
            statistical and mathematical models and algorithms as
            required by individual delivery orders.

        o   Requirements Analysis.   The contractor  shall  review
            management and functional requirements specified by EPA
            and develop detailed technical requirements which lead
            to system design and development.

        o   Systems  Analysis.    The  contractor  shall  perform
            detailed analysis of the user's information processing
            requirements related organizational mission objectives
            and functional activities.  The contractor shall review
            the use of existing systems, interview system users and
            other designated personnel, review available documenta-
            tion,  develop data element requirements, and determine
            if existing tools,  data  integration techniques, and
            procedures may be used to meet user requirements.  The
            contractor shall review existing  systems and hardware/

                                21

-------
software resources  for  efficiency of operation, cost
effectiveness, and  ability  to satisfy delivery orde:
requirements.

system  Design.   Using  system analysis  results,  the
contractor shall complete the definition of functional
requirements and data specifications, identify required
system modules, and develop  detailed design specifica-
tions.  The design specifications shall definitize data
sources and  format, systems  module interfaces, data
flow through the system,  information processing steps,
data generation, and output  reporting.. The contractor
shall also specify the user  system interface and shall
provide an overview of system operating procedures.

        Design.   The contractor  shall  refine design
specifications applicable to individual system modules
and include  information  related to hardware/software
physical characteristics, database and datafile struc-
tures,  schema,  record layouts,  data linkages,  data
integration techniques and data processing specifica-
tions.

Implementation,  using program design specifications,
the contractor  develops  coded instructions  using an
approved procedural or nonprocedural program language.
The contractor shall test individual modules, integrat-
ing all functional and general design specifications,
using suitable test data and formal test plans.

System Installation.  The contractor shall perform all
steps necessary to load,  test, and operate IRM system
and software modules for EPA approved computer systems.
Installation  includes an installation  plan,  program
compilations, development and cataloging of job control
language procedures and load modules, initialization of
source data files, preparation of production runbooks
and development of diagnostic test procedures.

system  Evaluation and Audit.   The contractor shall
perform all steps necessary for complete evaluation and
audit of specified EPA IRM application systems.  This
may include interviewing systems users; reviewing and
analyzing systems design documentation, user manuals,
program source code and system output reports to deter-
mine the degree to which a system performs the intended
functions;  the  efficiency and cost  effectiveness of
system operation; and design quality and integrity.

Training.   The contractor  shall provide  IRM system
users and  other interested  Program  Office personnel
training  in  the  use  and  operation  of  application

                    22

-------
systems, and  shall provide technical  and management
briefings on system functional capabilities and design
as required..

Documentation.  The'contractor shall provide technical
writing  and  text  editing  necessary  to provide  an
accurate record and  description  of the system design
and its  functional capabilities.  This  includes the
provision of  instruction  documents for operation and
use.  Typical documents developed include the system
description;  detailed  program  design specifications;
user manual;  database dictionary; and a program main-
tenance manual.

Boftvare Quality   Assurance.   The contractor  shall
provide a Software  Quality Assurance (SQA) plan for use
in  the  development, validation/  and  maintenance  of
software products  for EPA.  The BQA plan shall encom-
pass all phases of  the  software development life-cycle
and shall include the EPA System Design and Development
Guidance Manual (OIRN 87-02) by reference.
                    23

-------
   APPENDIX E
   Appendix E contains the Labor Rate Schedule for CSC
employees, as taken from the original TOSS contract Statement of
Work.
TOSS User's Guide      August, 1991            E-l

-------
Contract 68-WO-0043
                         Fixed Labor Rates
                         OPTION PERIOD ONE
                                            Attachment B
                                            *••• 1 of 30
     eta
DUOLXmOV
IS"'
                                        1.100
                                       li
                                       s
                                       1
                                      li
                                                         44J.J

-------
contract 68-WO-0043
                            Flxod labor R«tM
                             OPTION PERIOD ONE
                   AttachMnt B
                        2 of 30
      Subcontractori
      NKI/CRC SYSTEMS, ZNC.
      CL1N   DESCRIPTION

      10020  PROGRAM MANAGER
      10080  TECH PROJECT LEADER
      10130  SR MICROCOMPUTER SPEC
      10140  MICROCOMPUTER SPEC
      10150  OA/WP SPEC
      10160  SR SYS ANALYST
      10170  SYS ANALYST
      10190  SR PRGMR/ANALYST
      10200  PRGMR/ANALYST
      10220  PRGMR
      10270  SR TECH WRITER
      10280  TECH WRITER
      10290  SR HP OPERATOR
      10300  WP OPERATOR
      10310   SR LAN SPEC
      10320   LAN SPEC
     10340  EQUIP  INST  i LOG SUP
     10370  TELE SVC « EQUIP SPEC

                 TOTAL
  —-ON-SITE—
   BST   FIXED
  HOURS   RATE
900
1,800
3,600
1,800
2,700
3,600
3,600
2,700
9,000
37.24
32.70
24.83
31.42
36.11
27.53
33.60
24.29
22.13
         40.67
         27.42
         19.88
         34.37
 EST
HOURS
•SITE-
 FIXED
 RATE
1,800
1,800
1,800
2,520
1,260
1,800
2,520
2,520
1,890
3,200
900
1,800
900
900
630
1,890
1,260
61.24
42.81
37.57
26.54
96.10
ftl.50
31.6.'
38. C
27.9k
25.44
34.01
28.54
22.54
18.50
46.75
31.51
22.86
36,100
                                                          29.390

-------
Contract  68-WO-0043
      Subcontractor!
      ATLZS FEDERAL SERVICES,
                               Fixed Labo^Ratai
                               OPTION PERIOD ONE
INC
                             Attachment B
                             Pag*  3 of 30
       CLIN   DESCRIPTION
        —ON-SITE—-
          EST    FIXED
          HOURS   RATE
	OFF-SITE—
  EST    FIXED
  HOURS   RATE
      10020  ASST PROGRAM MANAGER
      10130  SR MICROCOMPUTER SPEC
      10160  SR SYS ANALYST
      10170  SYS ANALYST
      10190  SR PRGMR/ANALYST
      10200  PRGMR/ANALYST
      10220  PRGMR
      10270  SR TECH WRITER
      10280  TECH WRITER
      10290  SR WP OPERATOR
      10300  WP OPERATOR
      10440  SR DATA CONTROL CLERK
      10450  DATA CONTROL CLERK
      10550  TECH INFO SPEC
      10560  DOCUMENT ABSTRACTOR
      10570  DOCUMENT INDEXER
      10580  LEAD INFO PROC SPEC
      10610  MICROFILM EQUIP OPERATOR
      10620  MICROFILM SPEC
      10630  DOCUMENT CONTROL CLERK
1,800
1,800
3,600
4,500
1,800
900
5,400
900
1,800
900
900
18,000
11,700
400
1,400
1,800
2,700
BOO
450
14,400
69.54
49.78
49.78
40.24
36.57
30.23
2-7.48
• 6.57
90.23
25.97
22.68
24.71
22.68
27.48
27.47
24.99
20.64
16.16
18.50
16.16
                  TOTAL
                             75,950

-------
Contract 68-WO-0043
                               Fixad Labor Ratas
                               OPTION PERIOD ONE
                    Attachaant B
                    Paga 4 of 30
      Subcontractors
      AUTOMATED SCIENCES GROUP, INC
      CLIN   DESCRIPTION

      10020  ASST PROGRAM MANAGER
      10130  SR MICROCOMPUTER SPEC
      10150  OA/WP SPEC
      10160  SR SYS ANALYST
      10220  PRGMR
      10290  SR WP OPERATOR
      10300  WP OPERATOR
      10310  SR ;AN SPEC
      10320  LAN SPEC
      10440  SR DATA CONTROL CLERK
      10450  DATA CONTROL CLERK
      10560  DOCUMENT ABSTRACTOR
      10570  DOCUMENT INDEXER
      10610  MICROFILM EQUIP OPERATOR
      10620  MICROFILM SPEC

                  TOTAL
—-ON-SITE---
 ZST    FIXED
HOURS   RATE
—-OFF-SITE—
 EST    FIXED
HOURS   RATE
1,800
1,800
400
2,700
1,800
900
900
450
900
18,000
6,300
1,400
3,600
1,500
450
51.93
37.35
33.96
41.54
26.36
4)0.20
17.37
37.35
30.lt
23.37
17.37
23.37
23.37
17.37
17.37
                                                          42,900

-------
Contract 68-WO-0043
                                Fix«d
                                OPTION PERIOD ONE
                    Attachment B
                    P*g« 5 of 30
       Subcontractor!
       META,  INCORPORATED
       CLIN   DESCRIPTION

       10020  ASST PROGRAM MANAGER
       10130  SR MICROCOMPUTER SPEC
       10140  MICROCOMPUTER SPEC
       10160  SR SYS ANALYST
       10170  SYS ANALYST
       10200  PRGMR/ANALYST
       10220  PRGMR
       10290  SR HP OPERATOR
       10300  HP OPERATOR
—ON-SITE—
EST    FIXED
HOURS   RATE
-—OFF-SITE—
EST    FIXED
HOURS   RATE
900
3,600
2,700
4,500
7,200
3,600
1,§00
450
450
71.16
45.06
35.56
54.60
47.43
43.87
33.20
17.29
22.23
                   TOTAL
                    25,200

-------
Contract 68-WO-00;3
                             OPTION PERIOD ONE
                                                                 P*g« 6 of  30
  EDVAftfi V. BIAD. COISULTABT
                                     ......
   CLZN          DESCUPTZOR

  ioiio" SI'STS'AMALTST	
KTDU
  •OOIS    IATI
ESTIMATED  FIXED
 .10D1S    IATE
   1.200   $43.37

  Tioo"

-------
Contract  63-WO-00-13
                                                                    P»g«  7 of 30
                              OPTION. PERIOD TOO
  COMPUTER sczncis  CORPORATION
   CLZN
        DESCRIPTION
                               	ON-SITE
                               "SSSF*
  10010
  10020
  10030
  : 0040
   0030
   0060
  : 0070
   0080
  10090
  10100
 10:
 103.
 103J
 ios:
 10340
 10330
 103«0
PROGRAM MANAGER
ASST PROGRAM MANAGER
 ~        SURANCE COORD


          F
S

s
TEC
SR
     NCI
     MCI
     MGl
DBXS S
     . LOJ1
   )BMS  S
       EC
          CT LEADEI
          'EC
            	ICOMPUTER SPEC
            ICOKPUTEH SPEC
        SR  MICROCOMPUTER SPEC
        MICROCOMPUTER SPEC
     0  S
        STS ANALYST
        DATA ANALYST
           	

                  7YST
              TECH
              CURZTT
              ROGRAPH
 RGMR
PRGMR 	
IRM SECURITY SPEC
SR MICROGRAPH SPEC
MICROGRAPH SPEC
SR TECH WRITER
TECH WRITER
" WP OPERATOR
   OPERATOR
 R LAN SPEC

f tiSi im *
  ijj   	.	
  ^COMM ...
  LEPHONE I
  ERATIONS
           COMWTIi, OPgATOi,
          MyPTER OPERATOR  _
        JR COMPOTE!
        DAT4
                   _|UP TEC!

                     tree
                                   l.flO
I
                                       1.A7I.IOO
                                                       S14.4M

-------
Contract 68-WO-0043
                               Fixad Labor Rataa
                               OPTION PERIOD TWO
       Subcontractor!
       NMI/CRC  SYSTEMS,
INC.
                                   Attachnent B
                                   Paga 8 of 30
       CLZN    DESCRIPTION

       10020   PROGRAM MANAGER
       10080   TECH  PROJECT LEADER
       10130   SR MICROCOMPUTER SPEC
       10140   MICROCOMPUTER SPEC
       10150   OA/WP SPEC
       10160   SR SYS ANALYST
       10170   SYS ANALYST
       10190   SR PRGMR/ANALYST
       10200   PRGMR/ANALYST
       10220   PRGMR
       10270   SR TECH WRITER
       10280   TECH  WRITER
       10290   SR WP OPERATOR
       10300   WP OPERATOR
       10310   SR LAN SPEC
       10320   LAN SPEC
       10340   EQUIP INST ft LOG SUP
       10370   TELE  SVC ft EQUIP SPEC

                   TOTAL
                ---ON-SITE—-
                 EST    FIXED
                HOURS   RATE
990
1,980
3,960
1,980
2,970
3,960
3,960
2,970
9,900
990
2,970
1,980
1,100
38.75
34.01
25.82
32.66
37.55
28.63
34.94
25.27
23.01
42.29
28.50
20.69
35.75
 —-OFF-SITE—
 EST    FIXED
 HOURS   RATE
1,800
1,980
1,980
2,772
1,386
1,980
2,772
2,772
2,079
3,520
990
1,980
990
990
693
2,079
1,386
63.69
44.54
39.09
29.69
37.55
43.1
32.90
40.18
29.03
26.46
35.36
29.69
23.43
19.25
48.61
32.75
23.77
               39,710
32,149

-------
Contract 68-WO-0043
       Subcontractori
       ATLIS FEDERAL SERVICES,
                                Fixad Labor Ratt*
                                OPTION PERIOD TWO
INC
                            Attachment B
                            Pag« 9 of 30
       CLZN   DESCRIPTION

       10020   ASST PROGRAM MANAGER
       10130   SR MICROCOMPUTER SPEC
       10160   SR SYS  ANALYST
       10170   SYS ANALYST
       10190   SR PRGMR/ANALYST
       10200   PRGMR/ANALYST
       10220   PRGMR
       10270   SR TECH WRITER
       10280   TECH WRITER
       10290   SR WP OPERATOR
       10300   WP OPERATOR
       10440   SR DATA CONTROL CLERK
       10450   DATA CONTROL CLERK
       10550   TECH INFO  SPEC
       10560   DOCUMENT ABSTRACTOR
       10570   DOCUMENT INDEXZR
       10580   LEAD INFO  PROC SPEC
       10610   MICROFILM  EQUIP OPERATOR
       10620   MICROFILM  SPEC
       10630   DOCUMENT CONTROL CLERK
         —ON-SITE-—
          EST    FIXED
         HOURS   RATE
—-OFF-SITE—
 EST    FIXED
HOURS   RATE
1,800
1,980
3,960
4,950
1,980
990
5,940
990
1,980
990
990
19,800
12,870
440
1,540
1,980
2,970
880
495
15,840
72.34
51.78
51.78
41.84
£8.02
91.44
28. 58
38.02
31.44
27.02
23.59
25.72
23.59
28.58
28.56
25.98
21.46
16.81
19.25
16.81
                  TOTAL
                             83,365

-------
Contract 68-WO-0043
                                Fixed Labor natas
                                OPTION PERIOD TWO
                    Attachment B
                    Pag* 10  off 30
       •ubooatractors
       AUTOMATED SCIENCES  GROUP,  INC
       CLIN    DESCRIPTION

       10020   ASST PROGRAM MANAGER
       10130   SR MICROCOMPUTER SPEC
       10150   OA/WP SPEC
       10160   SR SYS ANALYST
       10220   PRGMR
       10290   SR HP OPERATOR
       10300   WP OPERATOR
       10310   SR LAN SPEC
       10320   LAN  SPEC
       10440   SR DATA CONTROL CLERK
       10450   DATA CONTROL CLERK
       10560   DOCUMENT ABSTRACTOR
       10570   DOCUMENT INDEXER
       10610   MICROFILM  EQUIP OPERATOR
       10620   MICROFILM  SPEC
—-ON-SITE	
 EST    FIXBD
HOURS   RATE
—OFF-SITE—
 EST    FIXED
HOURS   RATE
1,800
1,980
440
2,970
1,980
990
990
495
990
19,800
6,930
1,540
3,960
1,650
495
53.74
38.67
35.14
43.00
27.30
20.90
17.97
38.6"
31.1
24.1*
17.97
24.19
24.19
17.97
17.97
                  TOTAL
                    47,010

-------
Contract 68-WO-0043
                                Fixed Labor Rat««
                                OPTION PERIOD TWO
                    Attachaent B
                    Page 11 of 30
       •ubcontraotors
       META,  INCORPORATED
       CLIN   DESCRIPTION

       10020   ASST PROGRAM MANAGER
       10130   SR MICROCOMPUTER SPEC
       10140   MICROCOMPUTER SPEC
       10160   SR SYS ANALYST
       10170   SYS ANALYST
       10200   PRCMR/ANALYST
       10220   PRCMR
       10290   SR WP OPERATOR
       10300   WP OPERATOR
—ON-SITE	
 EST    FIXED
HOURS   RATE
	OFF-SITE--
 EST    FIXED
HOURS   RATE
900
3,960
2,970
4,950
7,920
3,960
1,980
495
495
74.72
47.30
37.33
57.33
49.79
46.07
34.84
28.63
23.34
                    TOTAL
                     27,630

-------
Crr.trac-  63-W3-0043
                          OPTION PERIOD TWO
P*|« 12 ef 30
EfitfAU V. BLUB, CONSULTANT
 CLIN          DCSdJPTXOH

ioiio" st'sis'iiuLTST	
ESTI
  •O
 me
ilioo" *i4t?47
• ----•-  ••--••OFF-SITE------
 ISP     "SuE"  fm>
      IATI

-------