oEPA
United States
Environmental Protection
Agency
                    Industrial Environmental Research  EPA-600/7-79-067b
                    Laboratory          April 1979
                    Research Triangle Park NC 2771 1
EPA Industrial Boiler
FGD Survey:
First Quarter 1979

Interagency
Energy/Environment
R&D Program Report

-------
                 RESEARCH REPORTING SERIES


Research reports of the Office of Research and Development. U.S. Environmental
Protection Agency, have been grouped into nine series. These nine broad cate-
gories were established to facilitate further development and application of en-
vironmental technology. Elimination  of traditional  grouping was consciously
planned to foster technology transfer and a maximum interface in related fields.
The nine series are:

    1. Environmental Health Effects Research

    2. Environmental Protection Technology

    3. Ecological Research

    4. Environmental Monitoring

    5. Socioeconomic Environmental Studies

    6. Scientific and Technical Assessment Reports  (STAR)

    7. Interagency Energy-Environment Research and Development

    8. "Special" Reports

    9. Miscellaneous Reports

This report has been assigned to the INTERAGENCY ENERGY-ENVIRONMENT
RESEARCH AND  DEVELOPMENT series. Reports in this series result from the
effort funded under  the 17-agency Federal Energy/Environment  Research and
Development Program. These studies relate to EPA's mission to protect the public
health and welfare from adverse effects of pollutants associated with energy sys-
tems. The goal of the  Program is to assure the rapid development of domestic
energy supplies in an environmentally-compatible manner by providing the nec-
essary environmental data and control technology. Investigations  include analy-
ses of the transport  of energy-related pollutants and their health and ecological
effects;  assessments of, and development of, control technologies for energy
systems; and integrated assessments of a wide range of energy-related environ-
mental issues.



                       EPA REVIEW NOTICE
This report has been reviewed by the participating Federal Agencies, and approved
for publication. Approval does  not signify that the contents necessarily reflect
the views and policies of the Government, nor does mention of trade names or
commercial products constitute endorsement or recommendation for use.

This document is available to the public through the National Technical Informa-
tion Service, Springfield, Virginia 22161.

-------
                                         EPA-600/7-79-067b

                                                    April  1979
EPA Industrial  Boiler FGD Survey:
              First  Quarter 1979
                            by
                  J. Tuttle, A. Patkar. S. Kothari,
              D. Osterhout, M. Heffling, and M. Eckstein

                    PEDCo Environmental, Inc.
                      11499 Chester Road
                     Cincinnati, Ohio 45246
                    Contract No. 68-02-2603
                        Task No. 45
                  Program Element No. EHE624
               EPA Project Officer: R. Michael Me Adams

             Industrial Environmental Research Laboratory
               Office of Energy, Minerals, and Industry
                 Research Triangle Park, NC 27711
                        Prepared for

             U.S. ENVIRONMENTAL PROTECTION AGENCY
                Office of Research and Development
                     Washington, DC 20460

-------
                           NOTICE

     This report (prepared by PEDCo Environmental, Inc.,
Cincinnati, Ohio under EPA Contract No. 68-02-2603, Task No.
45) is provided as an information transfer document.  Data
in this report are supplied voluntarily by industrial
representatives; flue gas desulfurization (FGD) system
designers, vendors, and suppliers; regulatory personnel; and
others.  Neither EPA nor the designated contractor warrants
the accuracy or completeness of information contained in
this report.
     Initial distribution of the report is limited to organi-
zation and individuals indicating a specific interest in the
field of FGD technology.  Additional copies of this report
and succeeding issues can be purchased from National Technical
Information Service, Springfield, Virginia  22151.
                               11

-------
                               TABLE OF CONTENTS
SECTION
•»•••••

      NOTICE

      TAtlLE UF CONTENTS

      EXECUTIVE SUMMARY                                                                   iv

  t    INTRODUCTION                                                                         1

  8    STATUS OF INDUSTRIAL bOILtRS WITH FGU SYSTEMS                                        3

           A SUHMAKY UF ALL INSTALLATIONS BY NAME, LOCATION, START-UP DATE*
           CURRENT STATUS, AND PAGE LOCATION FUR ADDITIONAL DATA.

  3    SUMMARY UF FGU SYSTEMS ON INDUSTRIAL BOILERS                                         6

           A UKIEF SUMMARY OF THE SOURCE CHARACTERISTICS, THE CONTROL PROCESS AND
           CONTROL SYSTEM SUPPLIER, ANU INFORMATION ON RECENT SYSTEM PERFORMANCE.

  4    SUMMARY BY VENDOR OF FGD SYSTEMS ON INDUSTRIAL BOILERS                              16

           A LIST UF THE CONTROL SYSTEMS SUPPLIED BY EACH SYSTEM VENDOR OR MANUFACTURER.

  5    SUMMARY BY CONTROL PROCESS OF FGO SYSTEMS ON INDUSTRIAL BOILERS                     19

  6    UPERATIONAL FGO SYSTEMS UN INDUSTRIAL BOILERS                                       22

  7    FUTURE FGU SYSTEMS ON INDUSTRIAL BOILERS                                            26

  8    SUMMARY OF DISPOSAL PRACTICES FOR FGO SYSTEMS ON INDUSTRIAL BOILERS                 27

  9    PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS           31

           AN IN DEPTH DATA PRESENTATION FOR THE OPERATIONAL CONTROL SYSTEMS.
           THIS SECTION PRESENTS BACKGROUND INFORMATION, OPERATING EXPERIENCE,
           DESIGN DATA, DISPOSAL PRACTICES, AND ANY OTHER RELEVANT INFORMATION
           AVAILABLE CONCERNING THE FGD SYSTEMS AT THE VARIOUS INSTALLATIONS.

 10    DESIGN INFORMATION FOR UNDER CONSTRUCTION FGO SYSTEMS ON INDUSTRIAL BOILERS        123

           SAME AS SECTION 9, FUR CONTROL SYSTEMS UNDER CONSTRUCTION*

 u    DESIGN INFORMATION FOR PLANNED FGD SYSTEMS ON INDUSTRIAL BOILERS                   i«6

           SAME AS SECTION 9, FOR PLANNED CONTROL SYSTEMS.

 12    DESCRIPTION UF INDUSTRIAL BOILER FGO SYSTEMS NOT OPERATING                         159

           SAME AS SECTION 9, FOR CONTROL SYSTEMS WHERE FOR SOME REASON,  THE SYSTEM
           IS Mil OPERATING.

 IS    INDUSTRIAL BOILER FGO COSTS                                                        166

 14    PROCESS DIAGRAMS FOR INDUSTRIAL BOILER FGD SYSTEMS                                 179

 IS    FUEL SULFUR CONTENT OF INDUSTRIAL BOILER FGD SYSTEMS                               223
                                         iii

-------
                                       EXECUTIVE SUMMARY


     THE FIRST FULL-SCALE UNITED STATES APPLICATION OF FLUE GAS OESULFURIZATION IFCO) TECHNOLOGY TO


INDUSTRIAL BOILERS HAS AT THE GENERAL MOTORS PLANT IN ST. LOUIS, MISSOURI WHERE T*0 F6D SYSTEMS MERE


INSTALLED ON THU CUAL-FIHEO BOKbttS IN 1972.  IN THIS 1ST QUARTER 1979 REPORT, 126 OPERATIONAL FGD


SYSTEMS ARE DESCRIBED.  THESE SYSTEMS ARE CONTROLLING 302 EMISSIONS FROM 232 BOILERS, LOCATED AT 56


PLANT SITES ACROSS THE UNITED STATES.  FGD SYSTEMS AT 21 PLANTS ARE KNOWN TO BE UNDER CONSTRUCTION


OK IN SOME STAGE OF PLANNING.  IN ADDITION THERE ARE 6 INSTALLATIONS INCLUDED IN THE REPORT HHERE


FGD OPERATIONS HAVE EITHER SEEN TERMINATED, INDEFINITELY SHUT UOMN, UR NEVEN STARTEO-UP.  THE TOTAL


COVERAGE OF THIS REPORT IS THEREFORE 65 INSTALLATIONS.  TABLE 1 SUMMARIZES THE NUMBER AND SCFM OF


THOSE SYSTEMS OPERATING, UNDER CONSTRUCTION, OK IN SOME PLANNING PHASE.
                                              TABLE  I
                        NUMBER AND SCFM OF INDUSTKIAL BOILER FGD SYSTEMS*



    STATUS


    OPERATIONAL


    UNDER CONSTRUCTION


    PLANNING


       CONTRACT AriAHDED


       LETTER OF INTENT


       REQUESTING/EVALUATING BIDS


       CONSIDERING USING FGO



    TOTAL                                   57       6,505,970         163                505
    •NOTE: THERE ARE PROBABLY SEVERAL FGO SYSTEMS IN ALL CATEGORIES WHICH HAVE NOT BEEN LOCATED BY
THIS SURVEY ANO THEREFORE ARE NOT COVERED IN THIS REPORT.
                                     ••CURRENT ISSUE CHANGES**


    THIS 1ST QUARTER 1979 ISSUE INCLUDES SEVERAL CHANGES AS FOLLOMSS


         1. THERE ARE TWO NED SECTIONS IN THE REPORTS ONE IS A SUMMARY TABLE t)Y FUEL AND FUEL SULFUR


         CONTENT (SECTION IS) ANO ONE IS A SUMMARY TABLE BY FGD PROCESS (SECTION 5).  THE PREVIOUS


         SECTION 5, "OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS," IS NO* SECTION 6.  THE PREVIOUS


         SECTIONS 6 AND 7, UNDER CONSTRUCTION AND PLANNED FGD SYSTEMS, MERE CONSOLIDATED INTO A NEW


         SECTION 7, "FUTURE FGO SYSTEMS ON INDUSTRIAL BOILERS.*


         2. TEN UNITS, ORIGINALLY DESIGNED AS PARTICIPATE CONTROL SYSTEMS, HAVE BEEN DELETED FROM


         THE REPORT I AMERICAN THREAD, AHMCO, THE SEVEN GREAT ntSTERN SUGAR PLANTS, ANO ST. REGIS.


         ALL THESE UNITS DEMONSTRATE SIGNIFICANT S02 CONTROL BECAUSE OF CAUSTIC, LIME, OR AMMONIACAL


         CONTENT IN THE SCRUBBING LIQUOR.  THESE DELETIONS HAVE BEEN MADE AT THE REQUEST OF


         RESPECTIVE PLANT REPRESENTATIVES.  IN THE REPORT, THERE ARE A FEW OTHER INSTALLATIONS


         MHERE A SIMILAR SITUATION EXISTS, I.E., SIGNIFICANT S02 REMOVAL IN SYSTEMS ORIGINALLY
                                                 iv
NO. OF
INSTALLATIONS
36
12
4
0
1
4
CAPACITY
SCFM
5,464,770
1,101,500
195,700
0
140,000
1,604,000
NO. OF SEPARATE
FGD SYSTEMS
126
24
5
0
2
6
NO. OF BOILERS
CONTROLLED
232
49
7
0
2
16

-------
         DESIGNED FUR PARTICIPATE CONTROL CONTINUED.  DATA TRANSFER CONCERNIN6 THIS TYPE OF SYSTEM
         IS VERY USEFUL TO EVERYONE CONCERNED KITH FGO TECHNOLOGY.
         3. THIS ISSUE INCLUDES SEVEN INSTALLATIONS NOT PREVIOUSLY INCLUDED IN THE SURVEY EFFORT.
         THREE OF THESE UNITS ARE COVERED IN THE HIGHLIGHTS SECTION JUST BELOW: CELANE8E, INLAND
         CONTAINER, AND STRATHMORE.  THE OTHER FOUR ARE DOUBLE BARREL OIL* GETTY OIL IN ORCUTT,
         CALIFORNIA, PFIZER, AND REICHHOLD CHEMICALS.  A DETAILED INDEX TO THESE AND ALL SYSTEMS
         MAY BE FOUND IN SECTION 2.

    TABLE 2 SUMMARIZES THE PLANTS ACCORDING TO THE YEAR UF FGD STARTUP, AND THE SCFM CAPACITY.
    HIGHLIGHTS FROM THE CURRENT INDUSTRIAL BOILER SURVEY ARE GIVEN BELOWs
                                              TA8LE   Z
                     STARTUP YEAR AND SCFM OF INDUSTRIAL BOILER FGO SYSTEMS
                                   YEAR
UNITS
                                                          SCFM
1972
1973
1974
1975
1976
1977
1978
1979
1980
1982
1984
1965
YEAR NOT YET
DETERMINED
TOTAL
1
1
5
9
5
4
9
14
4
1
1
1
2
57
64,000
347,000
431,400
1,276,070
959,300
291,000
1,953,000
990,200
450,000
140,000
1,200,000
280,000
124,000
8,505,970
     HIGHLIGHTS FROM  THE CURRENT INDUSTRIAL BOILER SURVEY ARE GIVEN BELONI
BELRIDGE OIL CO. HAS REPORTED A RELIABILITY INDEX VALUE OF ABOUT 82X FOR THE HEATER TECHNOLOGY UNIT.
ELECTRICAL MALFUNCTIONS, MIST ELIMINATOR DAMAGE, AND ABSORBER LINING DAMAGE MERE THE PRIMARY CAUSES
FOR DONNTIME.  THE C-E NATCO FGD SYSTEM STARTED UP ON MARCH 15 AND HAS DEMONSTRATED 802 REMOVAL
EFFICIENCY GREATER THAN REQUIRED.
C.A.M. CCARBI0E-AHOCO-MONSANTO) PLANNERS HAVE DECIDED THAT A DOUBLE ALKALI PROCESS MILL BE USED TO
CONTROL S02 EMISSIONS FROM THE THREE BOILERS TO BE INSTALLED AT THE C06ENERATION FACILITY.

-------
CELANESE CORPORATION HAS AWARDED A CONTRACT TO WHEELABRATOR-FHYE/ROCKKELL INTERNATIONAL TO INSTALL A



PARTICIPATE AND 302 CONTROL SYSTEM USING THE SPRAY DRYER/FABRIC FILTER CONFIGURATION AT THEIR



CUMBERLAND PLANT IN MARYLAND.  START-UP IS SLATED FOR THE END OF 197S.








IN BAKERSFIELOt CALIFORNIA* CHEVRON U.S.A., INC. CONTINUES TO OPERATE THE THREE FSD SYSTEMS AT 10UX



AVAILABILITY.  THE SOOA ASH CONSUMPTION IS CLOSE TO THE OPTIMUM STOICHIOMETHIC REUU1REMENT.








CHANSLOR WESTERN HAS CHANGED ITS NAME TO SANTA FE ENERGY CORPORATION.  THE FMC DOUBLE ALKALI SYSTEM



IS SCHEDULED TO STARTUP IN MAY 1979.








MHILE REPORTING CANCELLATION OF THE PLANS FOR THE PLANT IN TEXAS, DUPONT HAS DISCLOSED THE SITE



FOR THE PLANT IN GEORGIA TO BE NEAR ATHENS.








GETTY OIL HAS COMMISSIONED THE LAST FOUR OUT OF A TOTAL OF NINE IN-HOUSE DESIGNED SYSTEMS, AT



GETTY'S ENHANCED OIL RECOVERY OPERATION NEAR BAKERSFIELD, CALIFORNIA.  HOWEVER, ONLY FOUR SYSTEMS



MERE CONTINUOUSLY OPERATED DURING THIS QUARTER DUE TO THE INTRICACIES IN THE CURRENT OIL PRICING



REGULATIONS.







GREAT SOUTHERN PAPER CO. REPORTED THAT EARLIER PROBLEMS WITH PUMP SEAL FAILURES HAVE BEEN SOLVED BY



LONERING THE RECIRCULATED SOLIDS CONTENT AND INSTALLING SEAL HATER PRESSURE SWITCHES.








AT GRISSOM AIR FORCE BASE NEAR BUNKER HILL, INDIANA, CONSTRUCTION HAS BEGUN ON A 1.6 MILLION DOLLAR



CONCENTRATED DOUBLE ALKALI FGD SYSTEM SUPPLIED BY NEPTUNE AIRPOL.  THE SYSTEM MILL CONTROL



EMISSIONS FROM ONE NEW AND TWO EXISTING BOILERS FIRING COAL WITH AN AVERAGE SULFUR CONTENT OF ABOUT



3.5 PERCENT.







AT THE INLAND CONTAINER CORPORATION IN NEW JOHNSONVILLE, TENNESSEE, NEPTUNE AIRPOL IS SUPPLYING AN



FGO SYSTEM USING AMMONIA SCRUBBING TECHNOLOGY.  THE SYSTEM IS CURRENTLY UNDER CONSTRUCTION.








ITT RAYONIER, INC. REPORTED THAT THE BOILER AND THE AIRPOL FGD SYSTEMS OPERATED TROUBLE-FREE



THROUGHOUT THE PERIOD.  THE SYSTEM HAS NOT BEEN DOWN SINCE THE FAN MAS REPAIRED .LAST QUARTER.
                                                 vi

-------
KERR-MCGEE SODA ASH PLANT, UTILIZING A COMBUSTION EQUIPMENT ASSOCIATES DESIGN FOR 302 HEMOVALf  HE-



PORTED THAT BOTH SCRUBBERS DEMONSTRATED 100X RELIABILITY FOR THIS QUARTER.







NEK008A PAPERS, INC. IN ASHDONN, ARKANSAS REPORTED AN AVAILABILITY VALUE OF 100X FOR THEIR NEPTUNE



AIRPOL OE8I6NEO FGO SYSTEMS.  THE FGD SYSTEMS MERE SHUTDOWN FOR ABOUT ONE MEEK DUE TO MILL EXPANSION



NORK AND COAL HANDLING PROBLEMS.







PFIZER, AFTER EXTENSIVE TESTING FOR FOUR YEARS, HAS DEMONSTRATED COMPLIANCE AT THE EAST ST. LOUIS,(



ILLINOIS PLANT.  THE NLA-LEWIS DESIGN MAS MODIFIED BY PFIZER TO A LIME SCRUBBING SYSTEM WHICH HAS



ALSO ACHIEVED DESIRED PARTICULATE REMOVAL.  THE RELIABILITY OF 9SX HAS REPORTED FOR THIS PERIOD.







AT THE ST. JOE ZINC CO. FGD SYSTEM CONSTRUCTION IS NEARING COMPLETION? THE BUREAU OF MINES CITRATE



PROCESS SYSTEM IS NOW SCHEDULED TO START-UP IN APRIL 1979.








3TRATHMORE PAPER CO. A DIVISION OF HAMMERMILL PAPER COMPANY HEPOKTED THAT A DRY SCRUBBING (LIME)



FGD SYSTEM SUPPLIED BY MIKROPUL CORPORATION, A SUBSIDIARY OF U.S. FILTER CORPORATION, IS SCHEDULED



FOR STARTUP IN MAY, 1979 AT ITS NORONOCO PLANT.







SUN PRODUCTION CO. REPORTS THAT TWO FGD SYSTEMS AHE NEARING COMPLETIONI



    OILOALE, CALIFORNIA - THE SYSTEM MILL INCLUDE A TWO-STAGE SPRAY TOWER.  THE SCRUBBER IS DESIGNED



    TO HANDLE 6000 SCFM FROM AN EXISTING 25 MM BTU/HR OIL-FIRED STEAM GENERATOR.  START-UP IS



    SCHEDULED FOR EARLY APRIL 1979.







    FELLOWS* CALIFORNIA - THE SYSTEM, IDENTICAL TO THE ONE AT OILOALE, IS SCHEDULED FOR STARTUP



    BY EARLY MAY 1979.







TENNECO OIL CO. IS PLANNING TWO SODIUM CARBONATE FGD SCRUBBING SYSTEMS AT GREEN RIVER, WYOMING.



EACH SYSTEM MILL BE DESIGNED TO HANDLE 70,000 SCFM FROM A NEN 300,000 LB/HR COAL-FIRED BOILER.   THE



SYSTEMS ARE SCHEDULED TO START-UP IN EARLY  1982.








TEXASGULF INC. REPORTED 100X RELIABILITY FOR BOTH FGO SYSTEMS AT THEIR GRANGER, WYOMING SODA ASH



PLANT.  MAKEUP LIQUOR FLOW WILL NOW BE CONTROLLED BY RECIRCULATION LIQUOR PH AND DENSITY.
                                                vii

-------
    OF THE MORE THAN 170 ACTIVE (OPERATING* UNDER CONSTRUCTION, OR PLANNED) FGD UMTS ADDRESSED IN




THIS REPORT, MORE THAN HALF ARE BEING USED OR SCHEDULED TO BE USED IN ENHANCED OIL RECOVERY (EOR)



SITES IN CALIFORNIA.  bECAUSE OF THE FACT THESfc UNITS PREDOMINATE IN THIS REPORT, A BRIEF DISCUSSION




OF THE EOR INDUSTRY FOLLOWS.




    IN 1976, THt SAN JOAGIUIN VALLEY AIR BASIN PRODUCED ABOUT U5X OF CALIFORNIA'S CRUDE OIL OUTPUT.




EOR OPERATIONS ACCOUNTED FOR ABOUT SOX OF THAT PRODUCTION.  ADDITIONALLY, EOR OPERATIONS IN THE



BASIN ACCOUNTED FOR APPROXIMATELY BOX OF CALIFORNIA'S TOTAL EON OPERATIONS.




    THE MOST COMMON MEANS OF PRODUCING CRUDE UIL RELIES ON NATURAL UNDERGROUND PRESSURE TO PUSH THE




OIL TO THE SURFACE OF A WELL.  IF NATURAL PRESSURE IS LACKING, PUMPS ARE USED TO PULL THE OIL OUT OF



AN OIL RESERVOIR.  THESE METHODS OF PRODUCING CRUDE OIL ARE TERMED PRIMARY RECOVERY.  IF MATER IS



PUMPED INTO AN OIL RESERVOIR (SECONDARY RECOVERY), CRUDE RECOVERY CAN BE INCREASED OR "ENHANCED*.




WHEN THE CAPABILITIES UF THE PRIMARY AND THt SECONDARY METHODS ARE EXHAUSTED, ADDITIONAL ENHANCED



RECOVERY (TERTIARY RECOVERY) METHODS ARE CONSIDERED.  TERTIARY OIL RECOVERY EMPLOYS THERMAL MEANS TO




MAKE HEAVY, VISCOUS CRUDE OILS MOVE THROUGH SAND AND ROCK STKATA MORE EASILY.




    TYPICALLY STEAM IS INJECTED CONTINUOUSLY TO FLOOD THE UNUERGKOUND OIL RESERVOIR WITH STEAM AND



HOT NATER.  THERE *KE CURRENTLY ABOUT BOO STEAM GENERATORS (TYPICAL STEAM QUALITY IS 80 PERCENT) IN




THE SAN JOAQUIN BASIN AND MOST OF THESE UNITS HAVE CAPACITIES IN THE RANGE OF IS MM BTU/HR TO




65 MM BTU/HR.  STEAM GENERATORS IN THIS SIZE RANGE VARY FROM ABOUT 5,000 TO 30,000 ACFM 9 APPROX-




IMATELY 600 F.




     THE CALIFORNIA AIR RESOURCES BOARD (CAR8) HAS PROPOSED REGULATIONS WHICH MOULD REQUIRE THE



FOLLOWING FOR OIL-FIREU STEAM GENERATORS!



              SOURCE             SU2 EMISSION LIMIT             NOX EMISSION LIMIT
          NEW GENERATORS                 60 PPM                        100 PPM




       EXISTING GENERATORS              200 PPM                        150 PPM



     THIS REPORT ADDRESSES IN DETAIL FGD OPERATIONS FOR THOSE EOR PRODUCTION COMPANIES MHO HAVE




GIVEN PERMISSION.  THOSE COMPANIES ARE AS FOLLOWS:




          BELKIDGb OIL COMPANY



          CHEVRON U.S.A., INC.




          GETTY OIL COMPANY




          MOBIL OIL COMPANY



          SANTA FE ENERGY CORPORATION




          SHELL OIL COMPANY



          SUN PRODUCTION COMPANY




          TEXACO, INC.



     IN SECTION 2 OF THIS REPORT (BEGINNING ON PAGE 3) THE READER CAN FIND A DETAILED INDEX



TO INFORMATION ON THE ABOVE INSTALLATIONS.
                                                Viii

-------
                                              SECTION  1
                                             INTRODUCTION
    THIS REPORT ADDRESSES THE APPLICATION OF FLUE CAS DESULFURIZATION (FED) TECHNOLOGY TO INDUSTRIAL
BOILERS.  AN INDUSTRIAL BOILER WILL BE DEFINED AS A BOILER OK STEAM GENERATOR WHICH IS OPERATING OR
SCHEDULED FOR OPERATION AT AN INDUSTRIAL SITE.  THIS IS IN CONTRAST TO A UTILITY BOILER WHEREIN THE
PRIME FUNCTION IS STEAM GENERATION AND SUBSEQUENT CONVERSION TO ELECTRICAL POWER FOR SALE TO THE
PUBLIC.  THE NEED FOR SUCH A DOCUMENT HAS ARISEN AS A RESULT OF MORE STRINGENT EMISSION REGULATIONS
DESIGNED TO REDUCE SULFUR DIOXIDE (S02) EMISSIONS.  IN VIEW OF THE DEVELOPMENTAL STATUS OF FGO TECH-
NOLOGY, EPA'S INDUSTRIAL ENVIRONMENTAL RESEARCH LABORATORY IN RESEARCH TRIANGLE PARK, NORTH CARO-
LINA, HAS ESTABLISHED THIS PERIODICALLY UPDATED ENGINEERING APPLICATION/INFORMATION TRANSFER
PROGRAM FOR INDUSTRIAL USE OF 303 CONTROL TECHNOLOGY.
    fIRST ISSUED IN DECEMBER 1977 AS A COMPREHENSIVE 900-PAGE REPORT ON S02 CONTROL SYSTEMS ON ALL
NON-UTILITY COMBUSTION AND PROCESS SOURCES, THE CURRENT SERIES, IN THE INTEREST OF ECONOMIZING OPER-
ATIONS, ADDRESSES ONLY INDUSTRIAL BOILER APPLICATIONS OF FGD TECHNOLOGY.  THE FIRST ISSUE OF THIS
SERIES, ENTITLED "EPA INDUSTRIAL BOILER FGO SURVEY: FIRST QUARTER 1976," PRESENTED DETAILED TECH-
NICAL INFORMATION ON INDUSTRIAL BOILER FGD INSTALLATIONS.  THE INFORMATION MAS OBTAINED BY A
SURVEY OF PLANT PERSONNEL, CONTROL SYSTEM VENDORS, REGULATORY AGENCIES, AND ENGINEERING FIRMS.
    THE CURRENT REPORT REPRESENTS AN EXPANSION OVER THE FOURTH QUARTER 1970 ISSUE WITH RESPECT TO
BOTH THE NUMBER OF INSTALLATIONS, AND THE INFORMATION PRESENTED FOR EACH INSTALLATION.  THE DATA
ARE GIVEN IN TWO TYPES OF TABLES! ONE GIVES SUMMARY INFORMATION* THE OTHER DETAILED INFORMATION.
SUMMARY TABLES PRESENT INFORMATION AS FUNCTIONS OF TYPE OF CONTROL PROCESS, CONTROL SYSTEM VENDOR,
DISPOSAL TECHNIQUES AND OPERATIONAL STATUS (OPERATIONAL, UNDER CONSTRUCTION, PLANNED, OR NOT OPERAT-
ING).  NUMBERS, OPERATIONAL STATUS, AND OVERALL CAPACITY OF THE FGD SYSTEMS ARE SUMMARIZED IN THE
EXECUTIVE SUMMARY.  DETAILED INFORMATION INCLUDESI CONTROL SYSTEM DESIGN PARAMETERS, OPERATING EX-
PERIENCE, ECONOMICS, PROBLEMS AND SOLUTIONS, WASTE DISPOSAL TECHNIQUES, AND MAINTENANCE PRACTICES.
    THE INFORMATION IN THIS REPORT HILL BE PERIODICALLY UPDATED AND EXPANDED BY MEANS OF TELEPHONE
AND MAIL SURVEYS, AND PUBLISHED EACH QUARTER.  IN FUTURE ISSUES, THE DATA BASE ON SELECTED PLANTS
MILL BE EXPANDED BY ON-SITE SURVEYS.
    CERTAIN ENGINEERING SYMBOLS AND TERMS ARE USED VERY FREQUENTLY IN THE FIELD OF FGD TECHNOLOGY.
TABULATED BELOW ARE THE DEFINITIONS OF PERTINENT SYMBOLS AND TERMS USED IN THIS REPORT.

  SYMBOL/TERM                                     DEFINITION
 ACF               ACTUAL CUBIC FEET, UNIT OF GAS VOLUME MEASURED AT ITS ACTUAL TEMPERATURE AND
                   PRESSURE
 ACFN              ACTUAL CUBIC FEET PER MINUTE, UNIT OF GAS FLOW RATE MEASURED AT ITS ACTUAL
                   TEMPERATURE AND PRESSURE
 AVAILABILITY      HOURS THE FGD SYSTEM HAS AVAILABLE (WHETHER OPERATED OR NOT) DIVIDED BY HOURS IN
                   PERIOD, EXPRESSED AS PERCENTAGE
 Cf                CARBON STEEL
 F                 DEGREES FARENHEIT, UNIT OF TEMPERATURE

-------
DEFINITIONS (CONTINUED)
  SYMBOL/TERM
                                DEFINITION
 F.D.
 FRP
 GAL
 6PM
 1.0.
 L/6

 MM
 MS
 MN(COUIVALENT)
 OPERABILITY

 PSIB

 RELIABILITY

 8CFM
 T
 N.B.
FORCED DRAFT
FIBERGLASS-REINFORCED POLYESTER (OR PLASTIC)
GALLONS
GALLONS PER MINUTE
INDUCED DRAFT
LIQUID-TO-GAS RATIO, RECIRCULATING LIQUID FLON DIVIDED BY THE ACTUAL GAS FLOW,
GAL/1000 ACF
MILLION (DOLLARS, GALLONS, BTU, ETC.)
MILD STEEL
2000 SCFM/MH IS THE CONVERSION FACTOR USED FOR THIS REPORT.  ALTHOUGH THERE ARE
SEVERAL METHODS IN USE FOR ARRIVING AT EQUIVALENT MN, SUCH AS LB/HR OF STEAM,
MM BTU/HR OF HEAT INPUT, THE FACTOR MOST INFLUENTIAL IN AFFECTING EQUIPMENT
SIZING IS FLON RATE.  THIS CONVERSION ALLOWS FOR EASY COMPARISON BETWEEN THESE
INDUSTRIAL FGD SYSTEMS AND THE UTILITY F60 SYSTEMS.
HOURS THE FGO SYSTEM OPERATED DIVIDED BY BOILER OPERATING HOURS IN PERIOD*
EXPRESSED AS PERCENTAGE
POUNDS PER SQUARE INCH, UNIT OF PRESSURE, AS COMPARED TO ATMOSPHERIC PRESSURE
OF 14.7 PSI.
HOURS THE FGD SYSTEM MAS OPERATED DIVIDED BY HOURS IT NA8 CALLED UPON TO OPERATE,
EXPRESSED AS PERCENTAGE
STANDARD CUBIC FEET PER MINUTE, UNIT OF GAS FLON RATE MEASURED AT TO F AND I ATM.
PRESSURE
IF THE PRESSURE IS ASSUMED TO BE ONE ATMOSPHERE, THEN THE FOLLOWING RELATION
EXI8TSI SCFM * ACFM(4fcO * 70)/(4tO *• ACTUAL TEMP)
STAINLESS STEEL
TEMPERATURE
NATER GAUGE, PRESSURE DROP EXPRESSED AS INCHES OF MATER (ATMOSPHERIC • 407 IN.)
 0/0
SYMBOL USED WHEN THE .MONTH OF A,STARTUP DATE IS NOT AVAILABLE
SYMBOL USED WHEN NEITHER THE MONTH NOR THE YEAR OF A STARTUP DATE IS AVAILABLE
    THE ENGLISH SYSTEM IS USED IN THIS REPORT.  SOME OF THE CONVERSION FIGURES BETWEEN THE ENGLISH
AND METRIC SYSTEMS AND ABBREVIATIONS ARE SHONN BELONI
 I F (FOOT) • 0.304S MITER
 I T (SHORT TON) • 0.91 METRIC TON
 1 LI (POUND) • 0.49 KILOGRAM
 1 SAL (BALLON) • J.T9 LITER
 1 ML (BARREL) • O.lfc KILOLITER
 I ICPM • l.SS NORMAL CUBIC METERS PER HOUR
 1 BALLON/1000 ACF • 0.115 LITERS/NORMAL CUBIC METER
 1 BTU » 0.19 KCAL
    ANYONE DESIRING tO RECEIVE THE QUARTERLY UPDATED VERSIONS OP THIS REPORT FREE OF COST, MAY
RIOUEST ADDITION OF HIS/HER NAME TO THE MAILING LIST BY CONTACTIN8 THE IPA PROJECT OFFICER OR

-------
                                                                              STATUS TO APRIL  1979
                                             SECTION  2

                            STATUS OF INDUSTRIAL BOILEHS WITH F6D SYSTEMS
INSTALLATION NAME


ALYESKA PIPELINE SERVICE CO.

ARCO/POLYMER5, INC.

BELRIDGE OIL CO.

BELRIDGE OIL CO.

8ELR106E OIL CO.

»UNGE, INC.

C.A.M.(CARBIDE-AMOCO-MOMSANTO)

CANTON TEXTILES

CARBORUNDUM ABRASIVES

CATERPILLAR TRACTOR CO.

CATERPILLAR TRACTOR CO.

CATERPILLAR TRACTOR CO.

CATERPILLAR TRACTOR CO.

CATERPILLAR TRACTOR CO.

CATERPILLAR TRACTOR CO.

CELANESE CORPORATION

CHEVRON U.S.A. INC.

CHEVRON U.S.A. INC.

DOUBLE BARREL OIL CO.

OUPONT, INC.

FIRESTONE TIRE AND RUBBER CO.

FMC (SODA ASH PLANT)

GENERAL MOTORS CORPORATION

GENERAL MOTORS CORPORATION

GENERAL MOTORS CORPORATION

GENERAL MOTORS CORPORATION

GENERAL MOTORS CORPORATION

GEORGIA-PACIFIC PAPER CO.
    LOCATION


VALDtZ, ALASKA

MONACA, PENNSYLVANIA

MCKITTRICK, CALIFORNIA

MCKITTRICK, CALIFORNIA

MCKITTRICK, CALIFORNIA

CAIRO, ILLINOIS

HOUSTON, TEXAS

CANTON, GEORGIA

BUFFALO, NEW YORK

EAST PEORIA, ILLINOIS

JOLIET, ILLINOIS

MAPLETON, ILLINOIS

MAPLETON, ILLINOIS

MORTON, ILLINOIS

MOSSVILLE, ILLINOIS

CUMBERLAND, MARYLAND

6AKERSFIELD, CALIFORNIA

8AKERSFIELD, CALIFORNIA

BAKERSFIELD, CALIFORNIA

ATHENS, GEORGIA

POTTSTONN, PENNSYLVANIA

GREEN RIVER, WYOMING

OAVTONi OHIO

PARMA, OHIO

PONTIAC, MICHIGAN

ST. LOUIS, MISSOURI

TONONANDA, NEW YORK

CR08SETT, ARKANSAS
START-UP
  DATE    STATUS*
6-77
6-60
1-79
6-78
7-78
9-77
0-84
6-74
0-60
4-78
9-74
3-79
1-60
1-76
10-75
12-79
7-78
7-79
6-76
12-65
1-75
5-76
9-74
3-74
4-76
0-72
6-75
7-79
1
2
1
1
1
a
b
1
3
1
1
1
3
1
1
3
1
2
1
6
1
1
1
1
1
1
1
1
     PAGE NUMBER*


 31( 6,20,22,29,166)

123( 6,19,25,27,166)

 34( 6,20,22, 0,166)

 36 C 6,21,22,29,166)

 381 6,21,22,29,167)

159( 6,20, 0,27,167)

146< 6,19,26,30,   0)

 40( 7,19,22,28,167)

148( 7,20,26,29,   0)

 421 7,19,22,27,167)

 44( 7,19,22,27,168)

 47C 7,19,22,27,168)

1501 7,19,26,27*   0)

 49( 7,19,22,27,168)

 52( 6,19,22,27,168)

15K 8,19,26,30,   0)

 55( 6,20,22,29,169)

1251 8,20,25,29,169)

 S7( 8,21*22,28,169)

153( 6,19,26,27,   0)

 59( 8,19,22,27,1*9)

 63C 9,20,23,28,170)

 65( 9,21,23,29,170)

 68( 9,19,23,27,170)

 75( 9,21,23,27,170)

 77( 9,21,23,29,170)

 79( 9,21,21,29,171)

 • 1C 9,19,2J,29,171)
             * STATUS cooes
               0 - STATUS NOT DEFINED               S • PLANNEO-REOUE8TING/EVALUATIN6 BIDS
               1 - OPERATIONAL                      6 - PLANNED-CONSIDERING 102 CONTROLS
               2 * CONSTRUCTIONAL                   7 - TERMINATED
               3 - PLANNED-CONTRACT AWARDED         6 • INDEFINITELY SHUT DONN
               4 - PLANNED-LETTER OF INTENT SIGNED  9 - NEVER STARTED-UP

             » FOR COMPLETE INFORMATION ON THE INDICATED FttO SYSTEM REFER TO FIRST PAGE LISTED.
               THE INSTALLATION APPEARS IN OTHER SUMMARY SECTIONS ON THE PAGES IN PARENTHESES.
               A ZERO INDICATES THAT INFORMATION IS NOT AVAILABLE FOR AN INSTALLATION IN A
               PARTICULAR SECTION SEARCHED BY THE COMPUTER SYSTEM.  SECTION 14 PROVIDES PROCESS
               DIAGRAMS FOR SEVERAL INSTALLATIONS! AN INDEX TO THE FIGURES IS IN SECTION 14.

-------
                                                                              STATUS TO APRIL  1979
                                       SECTION  2 (CONTINUED)
                            STATUS OF INDUSTRIAL BOILERS WITH FGD SYSTEMS
INSTALLATION NAME

OCTTV OIL COMPANY
GETTY OIL COMPANY
GETTY OIL COMPANY
GREAT SOUTHERN PAPER CO.
ORI880M AIR FORCE BASE
HARRIS MININO CO.
INLAND CONTAINER CORPORATION
ITT RAVONIER, INC.
KERR-MC8EE CHEMICAL CORP.
MEAD PAPEHBOARO CO.
MINN-OAK FARMER'S CO-OPERATIVE
MOBIL OIL COMPANY
MOBIL OIL COMPANY
NEK008A PAPERS, INC.
NORTHERN OHIO SUGAR COMPANY
NORTHERN OHIO 8U6AR COMPANY
PFIZER, INC.
PHILLIP MORRIS* INC.
RCICHHOLO CHEMICALS, INC.
RICKENBACKER AIR FORCE BASE
SANTA PC ENER6V CORP.
SHELL OIL COMPANY
SHELL OIL COMPANY
SMELLER 8LOBE CORP.
ST. JOE ZINC CO.
STRATHMORE PAPER COMPANY
SUN PRODUCTION COMPANY
SUN PRODUCTION COMPANY
    LOCATION

BAKERSFIELD, CALIFORNIA
8AKER8FIELO, CALIFORNIA
ORCUTT, CALIFORNIA
CEDAR SPRINGS, bEOKGIA
BUNKER HILL, INDIANA
SPHUCE PINE, NORTH CAROLINA
NEW JOHN8UNVILLE, TENNESSEE
FERNANDINA BEACH, FLORIDA
TRONA, CALIFORNIA
STEVENSON, ALABAMA
HAHPETUN, NORTH OAKOTA
6UTTONWILLOW, CALIFORNIA
SAN ANOO, CALIFORNIA
ASHDONN, ARKANSAS
FINDLAY* OHIO
FHEEMONT, OHIO
EAST ST. LOUIS, ILLINOIS
CHESTERFIELD, VIRGINIA
PEN8ACOLA, FLORIDA
COLUMBUS, OHIO
BAKEH8FIELD, CALIFORNIA
8AKER8FIELD, CALIFORNIA
TAFT, CALIFORNIA
NORFOLK, VIRGINIA
MONACA, PENNSYLVANIA
NORONOCO, MASSACHUSETTS
FELLOWS, CALIFORNIA
OlLDALfc, CALIFORNIA
START-UP
  DATE    STATUS*
6-77
12-78
6-77
0-75
11-79
0-73
3-79
0-79
6-78
0-75
6-77
4-79
0-74
2-76
10-74
10-73
9-78
6-79
6-7S
3-76
5-79
0- 0
0- 0
0-79
4-79
3-79
9-79
4-79
1
1
1
1
2
8
2
1
1
1
1
2
1
1
7
1
1
2
1
1
2
6
6
S
2
2
a
2
     PAGE NUMBER*

 83(10,20,21.28,171)
 86(10,20,23,29,171)
 86(10,21,23,28,172)
 90(10,19,23,28,172)
126(10,19,23,27,172)
160(10,21,  0,JO,172)
128(10,19,25,27,172)
 92(11,21,23,29,173)
 94(11,20,23,28,173)
 97(11,20,24,27,173)
100(11,19,24,30,173)
129(11,20,23,28,174)
102(11,21,24,28,174)
104(11,19,24,27,174)
161(12,20,  0,29,174)
108(12,21,24,29,175)
109(12,20,24,27,173)
131(12,20*25,  0,175)
112(12,20,24,29,173)
113(12,20*24,28,176)
133(12,19,23,27,176)
134(13,20,26,30,   0)
133(13,20,26,30,   0)
162(13,21,  0,30*176)
133(13,19*29,28*176)
138(13,19,23,30,177)
140(13,21,29,28,177)
142(13,21*29*28*177)
             * STATUS CODES
               0 - STATUS NOT DEFINED
               1 - OPERATIONAL
               2 - CONSTRUCTIONAL
               3 - PLANNED-CONTRACT AWARDED
                    9 - PLANNEO-REOUE8TIN6/EVALUATING BIDS
                    6 - PLANNED-CONSIDERING 802 CONTROLS
                    7 - TERMINATED
                    6 - INDEFINITELY SHUT DONN
               4 - PLANNED-LETTER OF INTENT SIGNED  9 - NEVER STARTED-UP
               FOR COMPLETE INFORMATION ON THE INDICATED F6D SYSTEM REFER TO FIRST PAGE LISTED.
               THE INSTALLATION APPEARS IN OTHER SUMMARY SECTIONS ON THE PAGES IN PARENTHESES.
               A ZERO INDICATES THAT INFORMATION IS NOT AVAILABLE FOR AN INSTALLATION IN A
               PARTICULAR SECTION SEARCHED BY THE COMPUTER SYSTEM.  SECTION 14 PROVIDES PROCESS
               DIAGRAMS FOR SEVERAL INSTALLATIONS! AN INDEX TO THE FIGURES IS IN SECTION 14.

-------
                                                                              STATUS TO APRIL  1979
                                       SECTION  2 (CONTINUED)
                            STATUS OF INDUSTRIAL BOILERS WITH FGD SYSTEMS
INSTALLATION NAME

TENNECO OIL CO.
TEXACO INCORPORATED
TEXACO INCORPORATED
TEXAS6ULF
TRAN8CO TEXTILES! INC.
U.S. SYPSUM CORP.
NEITERN CORRECTIONAL INST.
    LOCATION

GREEN RIVER, WYOMING
SAN ARDO, CALIFORNIA
SAN AROO, CALIFORNIA
GRANGER, WYOMING
AUGUSTA* GEORGIA
OAKMONT, PENNSYLVANIA
PITTSBURGH, PENNSYLVANIA
START-UP
  DATE    STATUS*     PAGE NUMBER*

  1-82      5    156(11,20,26,28,   0)
 11*73      1    117(14,21,24,30,177)
  3-79      2    144(14,20,23,30,176)
  9-76      1    120(14,20,24,30,176)
  3-75      6    164(14,20,  0,29,176)
  0-0      9    163114,19,  0,26,176)
  1-60      3    137(13,21,26,26,   0)
             * STATUS COOES
               0 - STATUS NOT DEFINED
               1 - OPERATIONAL
               I - CONSTRUCTIONAL
               3. - PLANNED-CONTRACT AWARDED
                    9  •  PLANNED-REBUE8TIN6/EVALUATXNG  BIDS
                    6  •  PLANNED-CONSIDERING  802  CONTROLS
                    7  •  TERMINATED
                    8  -  INDEFINITELY  SHUT  DONN
               4 - PLANNED-LETTER OF INTENT SIGNED  9 - NEVER STARTED-UP
             t-FOR COMPLETE INFORMATION ON THE INDICATED F6D SYSTEM REFER TO FIRST PAGE LISTED.
               THE INSTALLATION APPEARS IN OTHER SUMMARY SECTIONS ON THE PAGES IN PARENTHESES.
               A ZERO INDICATES THAT INFORMATION IS NOT AVAILABLE FOR AN INSTALLATION IN A
               PARTICULAR SECTION SEARCHED BY THE COMPUTER SYSTEM.  4ECTION 14 PROVIDES PROCESS
               DIAGRAMS FOR SEVERAL INSTALLATIONS! AN INDEX TO THE FIGURES IS IN SECTION 14.

-------
                                                                            STATUS TO APRIL  1979
                                           SECTION  3

                           SUMMARY OF F60 SYSTEMS ON INDUSTRIAL BOILERS
COMPANY INFORMATION
BACKGROUND AND SUMMARY OF RECENT OPERATIONS
ALYESKA PIPELINE SERVICE CO.
VALDEZ, ALASKA
FMC ENVIRONMENTAL EQUIPMENT
OIL (0.03X - 0.1X SULFUR)
50,000 SCFM (DESIGN MAXIMUM)
START-UP    6/77
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
•BKGDI THE ALEYSKA FGD SYSTEM 18 UNIQUE IN THAT IT
MAS NOT INSTALLED PRIMARILY FOR CONTROL OF EMIS-
SIONS, BUT TO TREAT GAS USED IN THE OIL STORAGE
TANKS.
•1ST OTR 791 SCRUBBER OPERATIONS CONTINUED TO BE
PROBLEM-FREE DURING THIS REPORT PERIOD.  PLANS
ARE BEING MADE TO TEST MORE VOLATILE AMINE
CHEMICALS IN PLACE OF THE CYCLOHEXYLAMINE.
ARCO/POLYMERS, INC.
MONACAr PENNSYLVANIA
FMC ENVIRONMENTAL EQUIPMENT
COAL (3.OX SULFUR)
305,060 SCFM (TOTAL - 3 BOILERS)
START-UP    6/dO
DOUBLE ALKALI (CONCENTRATED)
STATUS - CONSTRUCTION
*BKGDI ARCO/POLYMERS HAS ANAROEO A CONTRACT TO FMC
ENVIRONMENTAL EQUIPMENT DIVISION FOR A DOUBLE
ALKALI FGO SYSTEM.  THE SYSTEM MILL CONSIST OF A
SEPARATE SCRUBBER TRAIN FOR EACH OF THE THREE
IDENTICAL BOILERS.  EACH ABSORBER MODULE MILL
HAVE FOUR DISC-AND-OONUT TRAYS AND BE FOLLOWED
BY A CHEVRON MIST ELIMINATOR.
•1ST QTR 79: CONSTRUCTION OF THE FGD SYSTEM STILL
IN EARLY STAGES, CONTINUES AS SCHEDULED.
BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA
HEATER TECHNOLOGY
OIL (l.IX SULFUR)
12,000 SCFM (1 BOILER)
8TART-UP    6/76
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
•BKGDI BELRIOGE IS UTILIZING A HEATER TECHNOLOGY
FGD SYSTEM TO CONTROL SOZ EMISSIONS FROM A SMALL
OIL-FIRED (l.IX SULFUR) STEAM GENERATOR AT AN EN-
HANCED OIL RECOVERY SITE.
•1ST OTR 791 A RELIABILITY INDEX OF 82X MAS
ACHIEVED THIS QUARTER.  ELECTRIC MALFUNCTIONS AND
DAMAGE TO THE LINING AND MIST ELIMINATOR MERE THE
MAJOR PROBLEMS IN ADDITION TO CAUSTIC LINE LEAKS
AND GAUGE GLASS REPAIRS.
BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA
THERMOTICS INC.
CRUDE OIL (l.IX SULFUR)
12,000 SCFM
START-UP    7/78
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
•BKGDI BELRIDGE IS UTILIZING A THERMOTICS, INC.
FGO SYSTEM TO CONTROL S02 EMISSIONS FROM A SMALL
OIL-FIRED (l.IX SULFUR) STEAM GENERATOR AT THE
MCKITTRICK ENHANCED OIL RECOVERY SITE.
•1ST QTR 791 THE FGD SYSTEM MAS OONN FOR THE
ENTIRE PERIOD DUE TO FAILURE OF A WELD LINE ON
THE ABSORBER.  THE MELDING NAB REPAIRED AND THE
SYSTEM MAS SCHEDULED TO START-UP ON MARCH-»3,
BELRIOGE OIL CO.
MCKITTRICK, CALIFORNIA
C-E NATCO
CRUDE OIL (l.IX SULFUR)
12,000 serM
START-UP    1/79
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
•BKGDI C-E NATCO HAS SUPPLIED A CAUSTIC SCRUBBING
FGD SYSTEM TO BELRIDGE OIL FOR ONE 50 MM BTO/HR
STEAM GENERATOR.  THE SYSTEM STARTED UP IN
MARCH 1979.
• 1ST QYR'WTME FIRST START-UP DID NOT ACHIEVE
COMPLIANCE (90X 802 REMOVAL) DUE TO INEFFICIENT
SPRAY NOZZLE DESIGN, HIGH BLONDONN RATl, AND LON
CAUSTIC ADDITION.  THE SECOND TESTING PERFORMED ON
MARCH IS, APPEARS TO HAVE ACHIEVED HIGH 802
REMOVAL O9SX).
BUNGE, INC.
CAIRO, ILLINOIS
DRAVO CORP./NAT'L LIME ASS'N
COAL (IX SULFUR)
4«,000 SCFM (TOTAL - 2 BOILERS)
START-UP    9/77
LIME SCRUBBING
STATUS - INDEFINITELY SHUT DONN
•BKGDI BUN8E PURCHASED THIS LIME SYSTEM FOR TEST-
ING PURP08IS.  THE PLANT REPORTS THAT THE LEMIS
SCRUBBER, A HORIZONTAL ROTARY SCRUBBER KITH
INTERNAL CHAINS, PERFORMED HILL DURIN8 THE TEST,
EFFECTING 94S 802 CONTROL.
•1ST OTR 791 SUNOS IS STILL FIRING LON SULFUR
(0.9X) COAL AND HAS NO PLANS TO REUSE THE SYSTEM.
C.A.M.(CARBIOE-AMOCO-MONSANTO)
HOUSTON, TEXAS
VENDOR NOT VET SELECTED
FU1L NOT YET SELECTED
1,100,000 8CFN (J BOILERS)
START-UP    0/84
DOUBLE ALKALI
STATUS - PLANNED-CONSIDERING 802 CONTROL
•BKGDI UNION CARBIDE, AMOCO, AND MONSANTO HAVE
ENTERED INTO A JOINT VENTURE (C.A.M.) MMICH HILL
PRODUCE 9,500,000 .LS/HR STEAM FOR PROCESS USE AND
16S MN ELECTRICITY TO THE LOCAL UTILITY BRIO.
• 1ST OTR 791 AFTER THE SELECTIONS A VENDOR TNI
CONSTRUCTION MILL START IN 2ND QUARTER WO HITM
COMPLETION SCHEDULED FOR JRO QUARTER 1984.

-------
                                                                            STATUS TO APRIL  1979
                                     SECTION  3 CCONTINUEO)

                           SUMMARY OF FGD SYSTEMS ON INDUSTRIAL BOILERS
COMPANY INFORMATION
BACKGROUND AND SUMMARY OF RECENT OPERATIONS
CANTON TEXTILES
CANTONi GEORGIA
FMC ENVIRONMENTAL EQUIPMENT
COAL (0.8X SULFUR)
25,000 SCFM Cl BOILER)
START-UP    6/74
CAUSTIC NASTE STREAM
STATUS » OPERATIONAL
*BKGDI AT CANTON TEXTILES THE CONTROL SYSTEM CON-
SISTS OF AN FMC MEDIUM ENERGY VENTURI SCRUBBER AND
UTILIZES A CAUSTIC NASTE STREAM FOR 802 REMOVAL.
THE UNIT HAS BEEN IN OPERATION SINCE JUNE 1974.
•1ST QTR 79: THE FGO SYSTEM WAS DOWN FOR ABOUT
ONE MEEK WHEN THE FAN MOTOR BURNED OUT.  IT MAS
REWIRED AND RETURNED TO SERVICE.
CARBORUNDUM ABRASIVES
BUFFALO, NEW YORK
CARBORUNDUM ENVIR. SYS. LTD.
COAL 12.ax SULFUR)
30,000 SCFM (TOTAL - 2 BOILERS)
START-UP    0/80
LIME SCRUBBING
STATUS - PLANNED-CONTRACT AWARDED
•BKGDI THE CARBORUNDUM F9D SYSTEM CONSISTS OF A
VENTURI FOR PARTICULATE CONTROL FOLLOWED BY A SIX-
STAGE SPRAY TONER.  IN 1975 THE VENTURI MAS PUT
INTO SERVICE USING MATER ONLY.  THE HUH CHLORIDES
CONTENT OF THE FLUE GAS CAUSED SERIOUS CORROSION
PROBLEMS, AND BOTH THE VENTURI AND THE SPRAY TONER
WILL BE REPLACED BEFORE START-UP OF THE COMPLETE
LIME SCRUBBING SYSTEM IN I960.  THE NEW VENTURI
AND SPRAY TOMER WILL BE MADE OF HA8TELLOY-C
AND FRPr RESPECTIVELY.
CATERPILLAR TRACTOR CO.
EAST PEORIAi ILLINOIS
FMC ENVIRONMENTAL EQUIPMENT
COAL (3.2X SULFUR)
210,000 SCFM (TOTAL - « BOILERS)
START-UP    4/76
DOUBLE ALKALI (CONCENTRATED)
STATUS - OPERATIONAL
•BKGDI START-UP OCCURRED IN APRIL 197S.  FGD
OPERATIONS PROCEEDED FOR 30 DAYS BEFORE BOILER
PLANT SHUTDOWN FOR THE SUMMER.  AN ABNORMALLY HIGH
PRESSURE DROP THROUGH THE SCRUBBERS IS RESTRICTING
THE BOILERS TO ABOUT SOX OF THEIR CAPACITY.
•1ST OTR 791 THE P6D SYSTEMS OPERATED NITHOUT ANY
MAJOR PROBLEMS.  UNAVAILABILITY OF 800A ASH CAUSED
THE SHUTDONN OF FGD OPERATIONS FOR MORE THAN ONE
MONTH.
CATERPILLAR TRACTOR CO.
JOLIET, ILLINOIS
ZURN INDUSTRIES
COAL (3.2X SULFUR)
67,000 SCFM (TOTAL - 2 BOILERS)
STAKT-UP    9/74
DOUBLE ALKALI (DILUTE)
STATUS - OPERATIONAL
•8K60I THE FGO SYSTEM CONSISTS OF AN INDEPENDENT
SCRUBBING TRAIN ON EACH OP TNO COAL-FIRED BOILERS.
•1ST QTR 79t THE F8D SYSTEMS WERE PLAGUED BY A
SERIES OF PROBLEMS.  MAJOR PROBLEMS MERE FAILURE
OF THE THICKENER PUMP, SLUDGE ACCUMULATION AND
PLUGGING AT VARIOUS PLACES IN THE SYSTEMS* AND
FREEZING OF SODA ASH SCREM FEEDER.
CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS
FMC ENVIRONMENTAL EQUIPMENT
COAL (3.IX SULFUR)
131,000 SCFM (TOTAL • 3 BOILERS)
START-UP    3/79
DOUBLE ALKALI (CONCENTRATED)
STATUS - OPERATIONAL
•BKGDI AT THE CATERPILLAR MAPLETON PLANT, FMC CON"
CENTRATEO MODE DUAL ALKALI TECHNOLOGY MILL !E
UTILIZED TO CONTROL 801 EMISSIONS.
•1ST OTR 791 CONfTRUCTION Of THE THREE F8D SYSTEMS
IS COMPLETE.  START-UP OPERATION! BB8AN MARCH 19.
ONE OF THE LARGE BOILERS MILL NOT BE OPERATED
THIS YEAR.
CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS
FMC ENVIRONMENTAL EQUIPMENT
COAL  (3.21 SULFUR)
105,000 SCFM  (TOTAL - i BOILERS)
START-UP    1/60
DOUBLE ALKALI  (CONCENTRATED)
STATUS - PLANNED-CONTRACT  AWARDED
•BKGDI AT THE MAPLBTON PLANT, AN ADDITIONAL
i NED BOILERS ARE PLANNED FOR START-UP IN THE
EARLY 1960'S.  INSTALLATION FOR THESE TNO HAS
STARTED.  THEY MILL EACH IE EQUIPPED
WITH FMC DOUBLE ALKALI FGO IV8TEM8.  TMEY NHL,
SHARE RE0ENERATION AND SLUOOE HANOLIN8 FACILITIES
NITH THE OTHER THREE PSD SYSTEMS AT THIS SITE.
CATERPILLAR TRACTOR CO.
MORTON, ILLINOIS
ZURN INDUSTRIES
COAL (3.IX SULFUR)
38,000 8CFM (TOTAL • I BOILERS)
START-UP    I/7S
DOUBLE ALKALI  (DILUTE)
STATUS - OPERATIONAL
•BKGDI THE CATERPILLAR MORTON PLANT UTILIZE! IURN
INDUSTRIES' DILUTE MODE DOUBLE ALKALI TBCHNOL08Y
TO CONTROL EMISSIONS FROM THE STEAM PLANT*
•1ST QTR 791 AN OPERATIN8 PERMIT HAS MEN GRANTED
FOR THE PLANT BY  IBPA.  OURINB THE REPORT PERIOD
FGD SYSTEMS 1 AND I YIELDED RELIABILITY VALUES
OF 99,TK AND 80.91 RESPECTIVELY.  MIST ELIMINATOR
PLU86INO AND FROZEN PIPIN8 MERE MAJOR CAUSE! Of
DOMNTIME.

-------
                                                                            STATUS TO APRIL  1979
                                     SECTION  3 (CONTINUED)

                           SUMMARY OF FGO SYSTEMS ON INDUSTRIAL BOILERS
COMPANY INFORMATION
BACKGROUND AND SUMMARY OF RECENT OPERATIONS
CATERPILLAR TRACTOR CO.
MOSSVILLEt ILLINOIS
FMC ENVIRONMENTAL EQUIPMENT
COAL (3.ai SULFUR)
140,000 SCFM (TOTAL - 4 BOILERS)
START-UP   10/75
DOUBLE ALKALI (CONCENTRATED)
STATUS • OPERATIONAL
•BK60: THE CATERPILLAR MOSSVILLE PLANT HAS UTIL-
IZED FMC CONCENTRATED MODE FGO SYSTEM EACH HEATING
SEASON SINCE OCTOBER 1975.  THERE ARE FOUR COAL-
FIRED BOILERS, EACH POSSESSING A SEPARATE SCRUB-
BING TRAIN.
•1ST OTR 79: THE OPERATION OF FGD SYSTEM CONTINUES
TO BE FLUCTUATING AND SPORADIC.  MIST ELIMINATOR
PLUGGING AND CHEMICALS IMBALANCE ARE THE MAJOR
PROBLEMS.
CELANESE CORPORATION
CUMBERLAND, MARYLAND
MHEELABRATOR-FRYE/ROCKNELL INT
COAL (1.0-2.01 SULFUR)
50,700 SCFM (1 BOILER)
START-UP   12/79
DRY LIME SCRUBBING
STATUS - PLANNED-CONTRACT AWARDED
•BKGD: A SPRAY DRYER/FABRIC FILTER CONFIGURATION
MILL BE USED TO CONTROL PARTICULATE AND 802
EMISSIONS FROM A COAL-FIRED BOILER AT THE
CUMBERLAND PLANT.  A DRY HASTE PRODUCT MILL BE
GENERATED.  CONSTRUCTION HILL BEGIN IN JUNE 1979
WITH START-UP EXPECTED BY THE END OF 1979.
CHEVRON U.S.A. INC.
BAKERSFIELD, CALIFORNIA
KOCH ENGINEERING
OIL (UU SULFUR)
248,000 SCFM (TOTAL - 16 BOILERS)
START-UP    7/78
SODIUM CARBONATE SCRUBBING
STATUS - OPERATIONAL
*8K60: CHEVRON U.S.A. UTILIZES THREE KOCH ENGINE-
ERING ABSORBERS TO REMOVE 802 FROM THE FLUE GAS OF
EIGHTEEN BOILERS.  THE SYSTEMS ARE DESIGNED TO
REDUCE S02 EMISSIONS TO LESS THAN 70 PPM.
•1ST OTR 79: THE FGD SYSTEMS OPERATED PROBLEM-FREE
DURING THE QUARTER DEMONSTRATING AN AVAILABILITY
INDEX OF 1001.
CHEVRON U.S.A. INC.
BAKERSFIELO, CALIFORNIA
KOCH ENGINEERING
OIL (1.1* SULFUR)
146,000 SCFM (TOTAL - 12 BOILERS)
START-UP    7/79
SODIUM CARBONATE SCRUBBING
STATUS - CONSTRUCTION
•1ST QTR 79: CHEVRON U.S.A. IS INSTALLING
TWO MORE FGD SYSTEMS AT THE BAKERSFIELD OIL SITE.
THESE HILL BE ONCE-THROUGH, SODIUM CARBONATE
SCRUBBING SYSTEMS AND ARE SCHEDULED TO GO ON*
STREAM BY JULY 1979.  A CONTRACT HAS BEEN AWARDED
TO KOCH ENGINEERING FOR THE DESIGN AND INSTALLA-
TION OF THE TWO SYSTEMS.  CONSTRUCTION HAS STARTED
IN JANUARY 1979.
DOUBLE BARREL OIL CO.
BAKERSFIELO, CALIFORNIA
C-E NATCO
OIL (l.U SULFUR)
12,000 SCFM (1 BOILER)
START-UP    6/78
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
•BKGOt C-E NATCO SUPPLIED THIS FGD SYSTEM AS A
PROTOTYPE UNIT.  EXTENSIVE TESTS MERE PERFORMED
OVER A HIDE RANGE OF SEVERAL PARAMETERS INCLUDING
PH, L/C RATIO AND SPRAY NOZZLE DESIGN.
*1ST QTR 79: THE RECIRCULATION PUMP SEAL NEEDED
REPLACEMENT.
DUPONT, INC.
ATHENS, 6EOR6IA
VENDOR NOT VET SELECTED
COAL (l.SX SULFUR)
280,000 SCFM (TOTAL - 3 BOILERS)
START-UP   12/85
DOUBLE ALKALI
STATUS - PLANNED-CONSIDERING 302 CONTROL
•BKGD: DUPONT ANNOUNCED PLANS TO ERECT A CHEMICAL
PLANT NEAR ATHENS, GEORGIA.  THE PLANT NILL HAVE
THREE COAL-FIRED BOILERS, WITH ONE ON STANDBY.
THE COMPANY HAS SELECTED THE DOUBLE ALKALI PROCESS
AS THE BASIS FOR A PRELIMINARY EVALUATION OF AIR
POLLUTION CONTROL STRATEGY.
•1ST QTR 791 THE PLANT IS SCHEDULED TO STARTUP BY
LATE 1985.
FIRESTONE TIRE AND RUBBER CO.
POTTSTONN, PENNSYLVANIA
FMC ENVIRONMENTAL EQUIPMENT
COAL (2.5 - 3.OX SULFUR)
8070 SCFM (13,000 ACFM a 300 F)
START-UP    1/75
DOUBLE ALKALI (CONCENTRATED)
STATUS - OPERATIONAL
•BKGD: THE FGD SYSTEM AT FIRESTONE-POTTSTOWN
CONSISTS OF AN FMC DOUBLE ALKALI DUAL THROAT
VENTURI SCRUBBER.  THIS CONTROL SYSTEM HAS BUILT
AS A DEMONSTRATION PROJECT FUNDED BY FIRESTONE.
•1ST QTR 79: DURING THE PERIOD, FGD SYSTEM OPER-
ATED NITM RELIABILITY VALUE OF 93.6X.  THE MAJOR
CAUSES OF DOHNTIME MERE PLU6GIN6 OF SPRAY NOZZLES,
REPAIRS ON VACUUM FILTER, SEPARATOR AND RECIRCU-
LATION LINE.

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION  3 (CONTINUED)

                            SUMMARY OF FGD SYSTEMS ON INDUSTRIAL BOILERS
 COMPANY INFORMATION
BACKGROUND AND SUMMARY OF RECENT OPERATIONS
 FMC (SODA ASH PLANT)
 GREEN RIVER,  NYOMING
 FMC ENVIRONMENTAL EQUIPMENT
 COAL (IX SULFUR)
 446*000 SCFM  (TOTAL - 2 BOILERS)
 START-UP   5/76
'SODIUM CARBONATE  SCRUBBING
 STATUS - OPERATIONAL
•BKGD: THE FGD SYSTEM CONSISTS OF TMO FMC SODIUM
SCRUBBING UNITS TO REMOVE SULFUR DIOXIDE AND PART-
ICULATE MATTER FROM THE FLUE GAS OF TWO BOILERS.
•1ST QTR 79! THE PLANT REPORTED NO MAJOR OPERATING
PROBLEMS.  DURING THIS PERIOD THE RELIABILITY
VALUE OF THE FGD SYSTEM HAS REPORTED TO BE
CLOSE TO 100X.
 GENERAL MOTORS CORPORATION
 DAYTON* OHIO
 ENTOLETERr  INC.
 COAL(0.7Jt - a.OX SULFUR)
 36,000 SCFM (TOTAL - 2 BOILERS)
 START-UP    9/74
 SODIUM HYDROXIDE SCRUBBING
 STATUS - OPERATIONAL
•BKGD: THE FGD SYSTEM CONSISTS OF TWO ENTOLETER
SODIUM HYDROXIDE SCRUBBING UNITS TO CONTROL EMIS-
SIONS FROM TMO 60,000 LB/HR COAL-FIRED BOILERS.
•1ST OTR 79: INSTALLATION OF THE NEW HASTELLOY-Q
MIST ELIMINATORS HAS BEEN COMPLETED.  AN
AVAILABILITY OF 80X WAS REPORTED FOR THIS PERIOD.
 GENERAL MOTORS CORPORATION
 PARMA,  OHIO
 GM ENVIRONMENTAL
 COAL  (Z.5X SULFUR)
 128,400 SCFM (TOTAL - 4 BOILERS)
 START-UP    3/74
 DOUBLE  ALKALI  (DILUTE)
 STATUS  - OPERATIONAL
•BKGD: THE FGD SYSTEM CONSISTS OF 4 CM-DESIGNED
DUAL ALKALI SCRUBBERS OPERATING ON 4 BOILERS.  THE
SCRUBBERS HANDLE A TOTAL 310,000 ACFM OF FLUE GAS.
•1ST OTR 79: AN OPERABILITY OF 39X HAS REPORTED
FOR THE PERIOD.  CHEMICAL BALANCE PROBLEMS HERE
ENCOUNTERED IN DECEMBER AND CONTINUED THROUGH MOST
OF THE PERIOD.  HIGH PH CAUSED PLUGGING IN THE TOP
TRAY,  THE PH PROBES USED FOR CONTROLLING CHEMICAL
FEED MERE RELOCATED.  HIGH EXCESS AIR AND CHANGES
IN THE L/G RATIO ARE BELIEVED TO BE THE CAUSE.
 GENERAL MOTORS CORPORATION
 PONTIAC,  MICHIGAN
 GM ENVIRONMENTAL
 COAL (0.84X SULFUR)
 107r360 SCFM (TOTAL  - 2 BOILERS)
 START-UP    4/76
 SODIUM HYDROXIDE SCRUBBING
 STATUS - OPERATIONAL
•BKGDI THE SCRUBBER SYSTEM CONSISTS OF TNO G.M.
SODIUM UNITS FOR THE REMOVAL OF FLYASH AND SULFUR
DIOXIDE FROM THE FLUE GAS OF TNO COAL-FIRED
BOILERS.
•1ST OTR 79: PRESSURE FILTERS HAVE BEEN INSTALLED
IN THE RECIRCULATION LINES TO PREVENT FURTHER
ABRASION PROBLEMS IN PUMPS AND PIPING DUE TO
FLYASH.  TO DATE, AN AVAILABILITY OF 100X WAS
REPORTED FOR THE PERIOD.
 GENERAL MOTORS CORPORATION
 ST.  LOUIS,  MISSOURI
 A.D. LITTLE
 COAL CS.2X  SULFUR)
 64,000 SCFM (TOTAL  - 2 BOILERS)
 START-UP    0/72
 SODIUM HYDROXIDE SCRUBBING
 STATUS - OPERATIONAL
•BKGO: THIS S02 CONTROL SYSTEM CONSISTS OF TWO GM
DESIGNED SODIUM SCRUBBING UNITS OPERABLE ON TWO
OF THE FOUR COAL-FIRED BOILERS.  THE SYSTEM IS
EQUIPPED WITH 60 F REHEAT AND HAS THE CAPABILITY
FOR FGD SYSTEM BYPASS.
•1ST QTR 79: A SHORTAGE OF CAUSTIC AND A FAN
BEARING FAILURE CAUSED SOME DOWNTIME DURING MARCH.
THE SYSTEM WAS SHUT DOWN FOR THE SUMMER SEASON
AT THE END OF MARCH.
 GENERAL  MOTORS CORPORATION
 TONONANDA,  NEW YORK
 FMC  ENVIRONMENTAL EQUIPMENT
 COAL (1.2X  SULFUR)
 92,000 SCFM (TOTAL - 4 BOILERS)
 START-UP    6/75
 SODIUM HYDROXIDE SCRUBBING
 STATUS - OPERATIONAL
•BKGD: THE FGD SYSTEM CONSISTS OF FOUR CM SODIUM
SCRUBBING UNITS FOR THE REMOVAL OF PARTICULATES
AND SULFUR DIOXIDE FROM FOUR COAL-FIRED BOILERS.
•1ST QTR 79: THE FOUR STAINLESS STEEL STUB STACKS
HAVE CORRODED DUE TO ACID CARRY.  A DECISION
TO EITHER RELINE OR REPLACE THEM HAS NOT BEEN
MADE.  TO DATE, AN AVAILABILITY OF 100X MAS
REPORTED FOR THE PERIOD.
 GEORGIA-PACIFIC PAPER CO.
 CROSSETT,  ARKANSAS
 NEPTUNE  AIRPOL, INC.
 BARK,COAL/OIL  (1.5X - 2.OX SULFUR)
 220,000  SCFM (1 BOILER)
 START-UP    7/75
 CAUSTIC  WASTE  STREAM
 STATUS - OPERATIONAL
•BKGD:   THE FGD SYSTEM CONSISTS OF AN AIRPOL
CAUSTIC SCRUBBING UNIT TO REMOVE SULFUR DIOXIDE
AND PARTICULATE MATTER FROM THE FLUE GAS OF A
COAL/BARK OR OIL/BARK POWER BOILER.  THE SYSTEM IS
PRECEDED BY CYCLONES FOR PARTICULATE REMOVAL.
•1ST QTR 79:  THE PLANT REPORTED NO OPERATING
PROBLEMS THIS QUARTER.  BARK WAS BURNED DURING THE
PERIOD WITH SUPPLEMENTAL OIL BURNED PART OF THE
TIME.

-------
                                                                            STATUS TO APRIL  1979
                                     SECTION  3 (CONTINUED)

                           SUMMARY OF F6D SYSTEMS ON INDUSTRIAL BOILERS
COMPANY INFORMATION
BACKGROUND AND SUMMARY OF RECENT OPERATIONS
6ETTY OIL COMPANY
BAKERSFIELO, CALIFORNIA
FMC ENVIRONMENTAL EQUIPMENT
OIL (1.1X SULFUR)
73,000 SCFM (TOTAL - 6 BOILERS)
START-UP    6/77
SODIUM CARBONATE SCRUBBING
STATUS " OPERATIONAL
*BK60l FMC SUPPLIED THIS SODIUM CARBONATE SCRUB-
BING SYSTEM IN JUNE 1977.  GETTY ENGINEERS HAVE
PERFORMED MAJOR MODIFICATIONS TO IMPROVE THE
PERFORMANCE.
•1ST OTR 791 THE SYSTEM MAS SHUT DONN DURING THIS
PERIOD, AND MAY REMAIN INOPERABLE IN THE NEAR
FUTURE DUE TO THE INTRICACIES IN THE CURRENT OIL
PRICING REGULATIONS.
GETTY OIL COMPANY
BAKERSFIELO, CALIFORNIA
IN-HOUSE DESIGN
OIL (l.U SULFUR)
d91,000 SCFM (TOTAL - 61 BOILERS)
START-UP   12/78
SODIUM CARBONATE SCRUBBING
STATUS • OPERATIONAL
•BKGOt GETTY OIL COMPANY HAS DEVELOPED AN IN-
HOUSE FGD PROCESS DESIGN TO CONTROL EMISSIONS FROM
81 STEAM GENERATORS, AT THE BAKER8FIELD EOR SITE.
THERE WILL BE 9 FGD SYSTEMS, EACH CONTROLLING FLUE
GAS GENERATED BY 9 STEAM GENERATORS.  EACH SYSTEM
WILL INCLUDE AN ABSORBER MODULE CONTAINING THREE
FLEXITRAYS AND ONE FLEXIMESH MIST ELIMINATOR.
*1ST OTR 791 LAST FOUR SYSTEMS HERE STARTED UP
DURING THIS PERIOD*  AFTER PERFORMANCE TESTING,
ONLY 4 OUT OF THE 9 SYSTEMS REMAINED OPERATIONAL.
GETTY OIL COMPANY
ORCUTT, CALIFORNIA
IN-HOUSE DESIGN
OIL (4.OX SULFUR)
SOOO SCFM (1 BOILER)
START-UP    6/77
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
*BKGDI FMC SUPPLIED THE ORIGINAL F6D SYSTEM.
HOWEVER, GETTY ENGINEERS HAVE PERFORMED EXTENSIVE
MODIFICATIONS TO IMPROVE THE 802 REMOVAL.  THE
DI8C-ANO-OONUT TRAYS HAVE BEEN REPLACED BY A
MUNTERS MIXING UNIT AS THE PACKING MATERIAL.
*18T QTR 791 THE FOD SYSTEM HAS BEEN OPERATIONAL
SINCE MARCH 10.  COMPLIANCE TESTING NAB CARRIED
OUT AND AT THE TIME OF THE REPORT RESULTS HAD NOT
BEEN RECEIVED.  NO PLUGGING HAS OCCURRED BECAUSE
OF THE HYDROCLONES IN THE RECIRCULATION LINES.
GREAT SOUTHERN PAPER CO.
CEDAR SPRINGS, GEORGIA
NEPTUNE AIRPOL. INC.
BARK,COAL/OIL U.OI - 2.OX SULFUR)
410,000 SCPM (TOTAL - 2 BOILERS)
START-UP    0/75
CAUSTIC WASTE STREAM
STATUS - OPERATIONAL
*BKGDI THE FGD SYSTEM CONSISTS OF TNO AIRPOL
CAUSTIC SCRUBBERS TO CONTROL PARTICULATE AND
SULFUR DIOXIDE FROM TNO PONER BOILERS.  THE
PRIMARY FUEL IS BARK/COAL  (BARK/OIL IS FIRED
OCCASIONALLY).
•1ST OTR 791 PROBLEMS ARE  STILL ENCOUNTERED WITH
PUMP SEALS.  THE RECIRCULATION PUMPS NITH MEN SEAL
WATER PRESSURE SNITCHES, ARE NOW OPERATING WITH
CONVENTIONAL PACKING AND ARE ROTATED DAILY TO
REPLACE RINGS.
GRI8SOM AIR FORCE BASE
BUNKER HILL, INDIANA
NEPTUNE AIRPOL, INC.
COAL (S.0» - 3.SI SULFUR)
32,000 8CFM (TOTAL • 3 BOILERS)
START-UP   11/79
DOUBLE ALKALI  (CONCENTRATED)
STATUS - CONSTRUCTION
*18T OTR 791 CONSTRUCTION HAS BEGUN ON A 32,000
SCFM CONCENTRATED DOUBLE ALKALI FGD SYSTEM.  THE
SYSTEM IS BEING SUPPLIED BY AIRPOL INDUSTRIES AND
CONSISTS OF 2 PARALLEL VENTURI SCRUBBERS, EACH
FOLLOWED BY A CYCLONIC SEPARATOR AND A STUB BTACK.
AIRPOL HAS GUARANTEED THAT EMISSIONS FROM THE
SCRUBBER WILL NOT EXCEED 1.2 LB/MM BTU SOI OR
0.171 LB/MM BTU FOR PARTICULATE.
HARRIS MINING CO.
SPRUCE PINE, NORTH CAROLINA
W.N. SLY MANUFACTURING CU.
COAL (0.81 SULFUR)
•,000 SCFM (TOTAL - 2 BOILERS)
START-UP    0/73
RATER BCRUBBINB (NA,NH3 OPTN.)
BTATUB - INDEFINITELY SHUT DOWN
*BKGD! THE FOD SYSTEM CONSISTS OF A W.W. SLY IM"
PINJET 8CNUBBER CURRENTLY BEIN6 USED STRICTLY A8 A
PARTICULATE CONTROL DEVICE.  THE SYSTEM HAS THE
CAPABILITY OF SCRUBBING WITH AMMONIA OR CAUSTIC
IF 802 CONTROL IS NECES8ARY.  HOWEVER, AS LONG AB
CURRENT LOW-SULFUR COAL SUPPLIES LAST, THERE IB NO
NEED FOR 802 CONTROLS.
INLAND CONTAINER CORPORATION
NEN JOHNBONVILLE. TENNESSEE
NEPTUNE AIRPOL INC.
WOOD/SPENT LIQUOR (43.01 SULFUR)
194,000 SCFM Cl BOILER)
START-UP    SW
AMMONIA SCRUBBING
BTATUB - CONSTRUCTION
*BKGOI AN AIRPOL DESIGNED PARTICULATE AND B02
CONTROL SYSTEM AT THIB PAPER MILL MILL CONBIBT OF
A VENTURI SCRUBBER AND SEPARATOR/ABSORBER COMBINA-
TION WITH A CHEVRON MIBT ELIMINATOR.
                                               10

-------
                                                                            STATUS TO APRIL  1979
                                     SECTION  3  (CONTINUED)

                           SUMMARY OF FCD SYSTEMS ON INDUSTRIAL BOILERS
COMPANY INFORMATION
BACKGROUND AND SUMMARY OF RECENT OPERATIONS
ITT RAYONIERi INC.
FERNANOINA BEACH* FLORIDA
NEPTUNE AIRPOL, INC.
BARK,OIL (2.OX - 2.5X SULFUR)
176,000 SCFM (TOTAL - 4 BOILERS)
START-UP    0/75
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
*BKGDI AT FERNANDINA BEACH* ITT RAYONIER FIRES
BARK AND OIL IN TWO OF THE FOUR PROCESS STEAM
BOILERS.  PARTICULATE AND 802 EMISSIONS ARE CON-
TROLLED IN TNO AIRPOL SCRUBBING TRAINS.
•1ST OTR 79! THE F60 SYSTEM OPERATED CONTINUOUSLY
THROUGHOUT THE PERIOD WITH 100X RELIABILITY.
KERR-MCGEE CHEMICAL CORP.
TRONA, CALIFORNIA
COMBUSTION EQUIPMENT ASSOC.
COKE/COAL/OIL (0.5X - S.OX SULFUR)
490*000 SCFM (TOTAL - 2 BOILERS)
START-UP    6/78
SODIUM CARBONATE SCRUBBING
STATUS - OPERATIONAL
*BKGDI THE FGD SYSTEM CONSISTS OF A COMBUSTION
EQUIPMENT (CEA) SODA ASH SCRUBBING SYSTEM NHICH
REMOVES FLYASH AND SULFUR DIOXIDE FROM THE FLUE
GAS OF THE TWO COAL-FIRED BOILERS.
*18T DTK 791 THE 317L S3 SIEVE TRAYS ARE WORKING
WELL.  FUEL USED, WAS A MIXTURE OF O.SX SULFUR
COAL AND 3.5X SULFUR COKE.  BOTH SCRUBBERS
DEMONSTRATED 100X RELIABILITY DURING THIS PERIOD.
MEAD PAPERBOARD CO.
STEVENSON, ALABAMA
NEPTUNE AIRPOLr INC.
OIL (l.SX - 3X SULFUR)
100,000 SCFM (TOTAL - 2 BOILERS)
START-UP    0/75
SODIUM CARBONATE SCRUBBING
STATUS - OPERATIONAL
•BKGDl AIRPOL HAS SUPPLIED A PARTICULATE
AND S02 CONTROL SYSTEM FOR THE TWO OIL-FIRED
BOILERS AT THIS MEAD PULP MILL.
•1ST QTR 791 THE SCRUBBER DEMONSTRATED 100X RELI-
ABILITY DURING THE REPORT PERIOD.
MINN-DAK FARMER'S CO-OPERATIVE
NAHPETON, NORTH DAKOTA
KOCH ENGINEERING
LIGNITE (l.OX SULFUR)
164,000 SCFM (TOTAL - 2 BOILERS)
START-UP    6/77
AMMONIA SCRUBBING
STATUS - OPERATIONAL
•BKGOt KOCH ENGINEERING HAS SUPPLIED TWO AMMONIA*
BASED 802 CONTROL SYSTEMS FOR THESE COAL-FIRED
BOILERS.  EACH YEAR THE PLANT ONLY PRODUCES SUGAR
DURING THE SEPTEMBER-FEBRUARY PERIOD.
*18T QTR 79t MODIFICATIONS TO CORRECT AN EXCESS
HEAT PROBLEM AT THE DIGESTERS ARE PLANNED FOR
THIS SUMMER.  THE SYSTEM HAS OPERATED ALMOST
TROUBLE-FREE THIS QUARTER.
MOBIL OIL COMPANY
8UTTONWILLOW, CALIFORNIA
HEATER TECHNOLOGY
OIL (1.1X SULFUR)
SO,500 SCFM (TOTAL - 7 BOILERS)
START-UP    4/79
SODIUM CARBONATE SCRUBBING
STATUS - CONSTRUCTION
•BKGDl MOBIL OIL HAS PURCHASED SEVEN EOUCTOR-TYPE
SCRUBBERS FROM HEATER TECHNOLOGY FOR THE CONTROL
OF EMISSIONS FROM 7 STEAM GENERATORS (25 MM BTU/
HR).  EACH SYSTEM CONSISTS OF A VENTURI SECTION, A
RECYCLE TANK, AND AN OUTLET DUCT WITH A MIST
ELIMINATOR.
•1ST QTR 791 START-UP DATE HAS BEEN EXTENDED TO
APRIL 1979 DUE TO DELAYS IN AWARDING SUBCONTRACTS
FOR PIPING AND OTHER WORK.
MOBIL OIL COMPANY
SAN AROO, CALIFORNIA
IN-HOUSE DESIGN
OIL (2.OX - 2.2SX SULFUR)
175,000 SCFM (T01AL - 28 BOILERS)
START-UP    0/74
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
•BKDGI MOBIL HAS DESIGNED THE FGD SYSTEM BY IN-
HOUSE ENGINEERING BASED ON A PATENTED SODIUM HYDR-
OXIDE SCRUBBING PROCESS.  THE I.D. FANS ARE LINED
WITH EPOXY RESIN TO REDUCE CORROSION.
•1ST QTR 791 ONLY 9 OUT OF THE 25 STEAM GENERATORS
WERE OPERATING DURING THIS PERIOD.  MOBIL REPORTS
THAT THIS SITUATION MAY CONTINUE THROUGH SEPT.
1979 BECAUSE OF THE INTRICACIES IN THI CURRENT
PRICING REGULATIONS.
NEK008A PAPERS, INC.
A8HDOWN, ARKANSAS
NEPTUNE AIRPOL, INC.
COAL UX - l.SX SULFUR)
211,000 SCFM (TOTAL - 1 BOILER)
START-UP    2/76
CAUSTIC SCRUBBING
STATUS • OPERATIONAL
•BKGDl THE FOD SYSTEM CONSISTS OF TWO AIRPOL
CAUSTIC SCRUBBERS CONTROLLING FLYASH AND SULFUR
DIOXIDE.
•1ST QTH 791 NO MAJOR FOD SYSTEM RELATED PROBLEMS
WERE ENCOUNTERED.  THE SYSTEM WAS DOWN FOR ABOUT
ONE WEEK DUE TO MILL EXPANSION WORK AND
PULVERIZER AND BUCKET ELEVATOR PROBLEMS.  THE
PLANT HAS BEGUN TO BURN SOME BARK.  AN AVAILABIL-
ITY VALUE OF 100S WAS REPORTED FOR THE FGO SYSTEM,
                                               11

-------
                                                                            STATUS TO APRIL  1979
                                     SECTION  3 (CONTINUED)

                           SUMMARY OF FGD SYSTEMS ON INDUSTRIAL BOILERS
COMPANY INFORMATION
BACKGROUND AND SUMMARY OP RECENT OPERATIONS
NORTHERN OHIO SUGAR COMPANY
FINDLAV, OHIO
GREAT WESTERN SUGAR
COAL (1.2* SULFUR, AVERAGE)
65*236 8CFM (TOTAL • 2 BOILERS)
START-UP   10/74
SODIUM CARBONATE SCRUBBING
STATUS • TERMINATED
•BKGOI THE VENTURI TONER MAS MAINLY DESIGNED FOR
PARTICULATE CONTROL* AND WAS STARTED UP IN OCTOBER
1974.  PARTICULATE AND 802 REMOVAL EFFICIENCIES
WERE 90S AND 76* RESPECTIVELY.  THE 302 CONTROL
WAS EFFECTED BY THE PROCESS CONOEN8ATE USED FOR
SCRUBBING (PHiB.7).
THIS PLANT HAS TERMINATED ALL SUGAR PRODUCTION
OPERATIONS.  THE SCRUBBER OPERATED FROM OCTOBER
1974 THROUGH THE 1977-1978 SEASON BEFORE THE
SHUTDOWN OCCURRED.
NORTHERN OHIO SUGAR COMPANY
FREEMONTr OHIO
GREAT WESTERN SUGAR
COAL (IS SULFUR)
40*000 SCFM (TOTAL • 2 BOILERS)
START-UP   10/73
SODIUM HYDROXIDE SCRUBBING
STATUS • OPERATIONAL
*BKGOI PARTICULATE AND 802 EMISSIONS ARE BEING
CONTROLLED BY A SCRUBBER/ABSORBER MODULE OF PRO-
PRIETARY DESIGN.  THE FLUE GAS IS GENERATED BY TWO
UNION BOILERS, EACH RATED 8 70,000 LB/HR STEAM.
NO INFORMATION ON OPERATIONAL EXPERIENCE HAS BEEN
MADE AVAILABLE BY PLANT PERSONNEL.
PFIZER* INC.
EAST ST. LOUIS* ILLINOIS
IN-HOUSE DESIGN
COAL (3.5* SULFUR)
40*000 SCFM (TOTAL 3 BOILERS)
START-UP    9/78
LIME SCRUBBING
STATUS - OPERATIONAL
*BKGDI PFIZER HAS PERFORMED FULL-SCALE TESTING ON
THE NLA-LEWIS SCRUBBER AT THE E. 8T. LOUIS PLANT
FOR FOUR YEARS.  WITH SOME DESIGN MODIFICATIONS,
THE LIME SCRUBBING SYSTEM MET THE REQUIRED
STANDARDS BY THE END OF 1978.
•1ST OTR 791 A RELIABILITY OF 99* NAB REPORTED.
THE DOWNTIME WAS REQUIRED FOR THE INSPECTION OF
THE MIST ELIMINATOR AND SCRUBBER INTERVALS.
PHILLIP MORRIS, INC.
CHESTERFIELD, VIRGINIA
FLAKT, INC.
COAL (1.4* SULFUR DESIGN)
39*000 SCFM (TOTAL - 1 BOILER)
START-UP    6/79
SODIUM CARBONATE SCRUBBING
STATUS - CONSTRUCTION
•1ST OTR 791 CONSTRUCTION 18 NEARIN6 COMPLETION ON
A NON-NEGENERABLE 80DIUM CARBONATE F6D SYSTEM
(SUPPLIED BY FLAKT* INC.) WHICH WILL CONTROL
EMISSIONS FROM A NEW PULVERIZED COAL-FIRED BOILER
GENERATING FLUE GAS EQUIVALENT TO 30 MW.  THE
FLAKT SYSTEM WILL REMOVE A MINIMUM OF 90S OF THE
802 FROM 2/3 OF THE FLUE 6A8I THE REMAINDER OF THE
GAB WILL BE USED FOR REHEAT.
REICHHOLD CHEMICALS* INC.
PENSACOLA* FLORIDA
NEPTUNE AIRPOL* INC.
MOOD 8 OIL (21 SULFUR)
80*000 SCFM (TOTAL - 2 BOILERS)
START-UP    4/75
SODIUM CARBONATE SCRUBBING
STATUS - OPERATIONAL
•BKGOI AT PENSACOLA* REICHHOLO CHEMICALS FIRE8
WOOD AND OIL IN TWO STEAM BOILERS.  PARTICULATE
AND 802 EMISSIONS ARE CONTROLLED IN TWO AIRPOL
SCRUBBING TRAINS CONSISTING OF VENTURI SCRUBBER
AND SEPARATOR COMBINATION.
*18T OTR 791 NO INFORMATION ON OPERATIONAL EXPER-
IENCE WAS MADE AVAILABLE.
RICKENBACKER AIR FURCE BASE
COLUMBUS* OHIO
RESEARCH-COTTRELL/BAHCO
COAL (3.M SULFUR)
59*000 SCFM (TOTAL - 7 BOILERS)
START-UP    3/76
LIMESTONE SCRUBBING
STATUS - OPERATIONAL
*BK6DI THIS RE8EARCH-COTTRELL/BACHO LIME F6D UNIT
WAS FIRST PLACED IN SERVICE MARCH II* 1976.
THE SYSTEM MAS SWITCHED UVER TO LIMESTONE IN APRIL
1977* AND HAS REMAINED IN THAT OPERATING MODE TO
DATE.
•1ST OTR 791 A TOTAL OF 4 DAYS DOWNTIME WERE
REPORTED FOH THIS PERIOD, YIELDING AN AVAILABILITY
OF 95.6*.  PLUGGING OCCURRED IN THE 1ST STAGE
LEVEL TANK LINE.  802 REMOVAL EFFICIENCIES OF SO-
85* WERE ACHIEVED WITH INCREASED THE LIMESTONE
FEED.
SANTA FE ENERGY CORP.
BAKERSFIELO, CALIFORNIA
PMC ENVIRONMENTAL EQUIPMENT
OIL (US* SULFUR)
70*000 SCFM (TOTAL - 8 BOILERS)
START-UP    5/79
DOUBLE ALKALI (CONCENTRATED)
STATUS - CONSTRUCTION
•BK6DI SANTA FE ENERGY CORP., FORMERLY CHANSLOR
WESTERN OIL CO., PURCHASED A DOUBLE ALKALI FGD
SYSTEM FROM FMC.
•1ST OTR 791 CONSTRUCTION IB NEARIN6 COMPLETION,
BUT THE START-UP DATE HAS BEEN FURTHER EXTENDED TO
MAY 1979 DUE TO PROJECTED DELAYS IN DUCTING
INSTALLATION AND GENERATOR START-UP.
                                               12

-------
                                                                            STATUS TO APRIL  1979
                                     SECTION  3  (CONTINUED)

                           SUMMARY OF FGD SYSTEMS ON  INDUSTRIAL BOILERS
COMPANY INFORMATION
BACKGROUND AND SUMMARY OF RECENT OPERATIONS
•HELL OIL COMPANY
BAKERSFIELDi CALIFORNIA
VENDOR NOT VET SELECTED
OIL (I.IX SULFUR)
99*000 8CFM CTOTAL • 8 BOILERS)
START-UP    O/ 0
PROCESS NOT YET SELECTED
STATUS » PLANNED-CONSIDERING  302  CONTROL
•BKGDI SHELL OIL IS CONSIDERING IMPLEMENTING FGO
TECHNOLOGY TO CONTROL EMISSIONS FROM S SMALL OIL-
FIRED (1,1* SULFUR) STEAM GENERATORS.  NO PROCESS
OR START-UP DATE HAVE AS YET BEEN SPECIFIED.  AN
802 REMOVAL EFFICIENCY OF 94X WILL BE REQUIRED.
SHELL OIL COMPANY
TAFT, CALIFORNIA
VENDOR NOT YET SELECTED
OIL  (I.IX SULFUR)
19*000 SCFH (TOTAL - 2 BOILERS)
START-UP    Of 0
PROCESS NOT YET SELECTED
STATUS » PLANNED-CONSIDERING 808  CONTROL
*BKGDI SHELL OIL IS CONSIDERING IMPLEMENTING FGO
TECHNOLOGY TO CONTROL EMISSIONS FROM 2 SMALL OIL-
FIRED (U1X SULFUR) STEAM GENERATORS.  NO PROCESS
OR START-UP DATE HAVE AS YET BEEN SPECIFIED.  AN
302 REMOVAL EFFICIENCY OF 94X HILL BE REQUIRED.
8HELLER GLOBE CORP.
NORFOLK* VIRGINIA
M.N. SLY MANUFACTURING CO.
COAL (« 1.01 SULFUR)
SiOOO'SCFM (TOTAL - 1 BOILER)
START-UP    0/73
SODIUM HYDROXIDE SCRUBBING
STATUS • INDEFINITELY SHUT OOHN
*BKGOI AFTER SYSTEM RESTART IN OCTOBER 1977,
THERE HAVE BEEN NO PROBLEMS RESULTING FROM EITHER
BOILER OR SCRUBBER OPERATIONS.  THE PLANT UNDER-
WENT A VIRGINIA EPA INSPECTION AND WAS FOUND  TO BE
IN COMPLIANCE WITH THE PARTICULATE EMISSION
REGULATIONS.
*4TH QTR 7SI NO SCRUBBER RELATED PROBLEMS HAVE
OCCURRED DURING THIS REPORT PERIOD.  AT PRESENT
THE USE OF NAOH HAS BEEN DISCONTINUED* 80 THIS
SYSTEM HAS BEEN MOVED TO OUR "INDEFINITELY
SHUTDOWN* STATUS.
ST. JOE ZINC CO.
MONACAr PENNSYLVANIA
BUREAU OF MINES
COAL C2.S* - 4.SX SULFUR)
142*000 8CFM (TOTAL - I BOILER)
START-UP    4/79
CITRATE PROCESS
STATUS • CONSTRUCTION
*BKGDI CONSTRUCTION CONTINUES ON THE CITRATE
PROCESS SCRUBBING SYSTEM NHICH MILL CONTROL 802
EMISSIONS FROM A 60-MW (NOMINAL PEAK CAPACITY)
COAL-FIRED POWER GENERATING UNIT.  STARTUP 18 NOW
SCHEDULED FOR APRIL 1979.  THIS SYSTEM WILL ALSO
BE REPORTED IN THE EPA/PEDCO UTILITY FGD SURVEY,
SINCE THE 8V8TEM HILL BE OPERATED WITH A UTILITY-
TYPE LOAD PROFILE* DURING THE ONE-YEAR DEMONSTRA-
TION PERIOD.
•TRATHMORC PAPER COMPANY
MORONOCO* MASSACHUSETTS
aiWfOfUL" CORPORAtION
COAL/OIL (0.75-J.OX SULFUR)
22*000 SCFM (t BOILER)
BTART-UP    4/79
PRY LIME SCRUBBING
STATUS - CONSTRUCTION
tBKGDI THE DRY SCRUBBING SYSTEM SUPPLIED BY
MIKROPUL TO REMOVE PARTICULATE MATTER AND 802
FROM THE FLUE GAS WILL HAVE A SPRAY DRYER AND
FABRIC FILTER CONFIGURATION.  IT WILL GENERATE A
DRV WASTE.  STARTUP IS SLATED FOH MAT 1979.
SUN PRODUCTION COMPANY
FELLONS* CALIFORNIA
C-E NATCO
OIL (1.4X SULFUR)
6,000 SCFM (12*000 ACFM * 970 F)
START-UP    5/79
SODIUM HYDROXIDE SCRUBBING
STATUS - CONSTRUCTION
*BKGDI SUN OIL HAS FOUR 25 MM BTU/HR AND TWO 50 MM
BTU/HR STEAM GENERATORS AT THIS OIL SITE.  THE
CRUDE OIL HAS 1.4 PERCENT SULFUR.
•15T OTR 791 C-E NATCO IS CONSTRUCTING THE SYSTEM.
STARTUP DATE HAS BEEN MOVED BACK TO MAY 1* 1979.
SUN PRODUCTION COMPANY
OILDALE* CALIFORNIA
C-E NATCO
OIL (1.2X SULFUR)
6,000 SCFM (12*000 ACFM * 570 F)
START-UP    4/79
SODIUM HYDROXIDE SCRUBBING
STATUS - CONSTRUCTION
*BKGDI SUN OIL HAS TWO 25 MM BTU/HR STEAM GENERA'
TORS AT THIS OIL SITE.  THE CRUDE OIL HAS 1.2
PERCENT SULFUR.
•1ST OTR 791  THE SYSTEM, SUPPLIED BY C-E NATCO,
IS UNDER CONSTRUCTION.  STARTUP DATE IS APRIL I,
1979.

-------
                                                                            STATUS TO APRIL
                                     SECTION  3 (CONTINUED)

                           SUMMARY OF F60 SYSTEMS ON INDUSTRIAL BOILERS
COMPANY INFORMATION
BACKGROUND AND SUMMARY OF RECENT OPERATIONS
TENNECO OIL CO.
GREEN RIVER, WYOMING
VENDOR NOT YET SELECTED
COAL (1.5X SULFUR, MAXIMUM)
140,000 SCFM (TOTAL - 2 BOILERS)
START-UP    1/82
SODIUM CARBONATE SCRUBBING
STATUS - PLANNED-REQUESTING/EVALUATING BIDS
•BKGO: TENNECO OIL HAS RETAINED BROHN AND ROOT
FUK THE DESIGN OF A SODA ASH PLANT AND THE
CONCOMMITTANT POLLUTION CONTROL EQUIPMENT.
THE PLANT DULL BE LOCATED IN GREEN RIVER, WYOMING
AND WILL HAVE TWO BOILERS BURNING WYOMING COAL.
•1ST QTR 791 TENNECO AND BtR ARE EVALUATING BIDS
FOH THE SODIUM CARBONATE SCRUBBING SYSTEMS WHICH
HILL CONTROL 302 EMISSIONS FROM- THE BOILERS.
TEXACO INCORPORATED
SAN ARDO, CALIFORNIA
CEILCOTE
OIL U.7X SULFUR)
347,000 SCFM (TOTAL - 29 BOILERS)
START-UP   11/73
SODIUM HYDROXIDE SCRUBBING
STATUS - OPERATIONAL
*BKGD: FGD SYSTEM CONSISTS OF A HORIZONTAL,  PACK-
ED-BED SCKUBBER FOR EACH OF THE OIL-FIRED BOILERS.
•1ST OTR 791 CORROSION IN THE QUENCHER AND ABRA-
SION/PLUGGING IN THE ABSORBER CONTINUE TO BE PROB-
LEM AREAS.  DURING THIS QUARTER EACH SCRUBBER MAS
SHUTDOWN FOR MAINTENANCE AN AVERAGE OF 100 HOURS.
TEXACO is PLANNING TO PHASE OUT THIS GROUP OF
SCRUBBERS BY LATE 1979.
TEXACO INCORPORATED
SAN ARDO, CALIFORNIA
DUCON COMPANY
OIL (1.7X SULFUR)
99,000 SCFM (TOTAL - 9 BOILERS)
START-UP    3/79
SODIUM CARBONATE SCRUBBING
STATUS - CONSTRUCTION
•8KGO: TEXACO IS PLANNING TO PHASE OUT THE
EXISTING FGO SYSTEMS AT THEIR SAN ARDO, CALIFORNIA
SITE.  AS THE FIRST STEP OF THE PROGRAM, 9 OF THE
PRESENT 36 SCRUBBERS ON SO MM BTU/HR STEAM GENER-
ATORS ARE BEING REPLACED BY A NEW SYSTEM, SUPPLIED
BY DUCON COMPANY.  THE NEW FGD SYSTEM WILL CON-
SIST OF THREE TRAINS OF A VENTURI SCRUBBER/SPRAY
ABSORBER COMBINATION.
•1ST QTR 79: THE FGD SYSTEMS ARE SCHEDULED FOR
START-UP IN MAY 1979.
TEXASGULF
GRANGER, WYOMING
SMEMCO INC.
COAL (0.75X SULFUR)
140,000 SCFM (TOTAL - 2 BOILERS)
START-UP    9/76
SODIUM CARBONATE SCRUBBING
STATUS - OPERATIONAL
*BKGDI THIS SODIUM CARBONATE SCRUBBING SYSTEM MAS
DESIGNED BY SMEMCO.  302 ABSORPTION OCCURS IN THE
QUENCHER AND THE SIEVE-TRAY ABSORBER MODULE.  AN
INTERESTING FEATURE IS AN INTERNAL DAMPER WHICH
ALLOWS A 4 TO 1 TURNDOWN RATIO.
•1ST QTR 791 THE SCRUBBERS OPERATED WITH 100X
RELIABILITY DURING THIS PERIOD.  BOTH THE RECIRCU-
LATIDN LIQUOR DENSITY AND PH WILL BE USED TO
CONTROL THE MAKEUP LIQUOR FLOW RATE.
TRANSCO TEXTILES, INC.
AUGUSTA, GEORGIA
FMC ENVIRONMENTAL EQUIPMENT
FUEL OIL (2X MAX. SULFUR)
50,000 ACFM
START-UP    3/75
SODIUM CARBONATE SCRUBBING
STATUS - INDEFINITELY SHUT DOWN
*BKGDI THE FGO OPERATIONS HAVE BEEN TERMINATED FOR
AN INDEFINITE PERIOD.  THE PLANT BURNS NUMBER 6
FUEL OIL ANO THE SULFUR DIOXIDE EMISSIONS ARE SOX
OF THE EXISTING REGULATIONS.  THE BOILER 18 RATED
AT 20 MM (EQUIVALENT) AND PRODUCES 150,000 LB8/HR
STEAM.  WHEN OPERATIONAL* THE SCRUBBER SYSTEM HAD
A FLUE GAS VOLUME OF 50,000 ACFM AT 140 DEGREES F.
SYSTEM START-UP OCCURRED IN MARCH 1975  AND SCRUB-
BEK OPERATIONS WERE TERMINATED LATER IN THE SAME
YEAR.  THERE ARE CURRENTLY NO PLANS TO INITIATE
OPERATIONS.
U.S. GYPSUM CORP.
UAKMONT, PENNSYLVANIA
NEPTUNE AIRPOLf INC.
COAL
19.30U SCFM (TOTAL - 4 BOILERS)
START-UP    O/ 0
DOUBLE ALKALI (DILUTE)
STATUS • NEVER STARTED-UP
•BKGDJ AN AIRPOL DOUBLE ALKALI SCRUBBIN6 SYSTEM
IS ON-8ITE, INSTALLED, AND READY FOR OPERATIONS.
HOWEVER, US GYPSUM DECIDED NOT TO INITIATE
PRODUCTION AT THIS FACILITY FOR ECONOMIC REASONS.
*4TH QTR 781 A CHECK DURING THIS PERIOD REVEALED
THAT THE PLANT HAS NOT BEEN STARTED YET.
                                               14

-------
                                                                            STATUS TO APRIL  1979
                                     SECTION  3  (CONTINUED)

                           SUMMARY OF F6D SYSTEMS ON INDUSTRIAL BOILERS
COMPANY INFORMATION
BACKGROUND AND SUMMARY OF RECENT OPERATIONS
WESTERN CORRECTIONAL INST.
PITTSBURGH, PENNSYLVANIA
PITTSBURGH ENV.SENGV. SYSTEMS
COAL C3.5X SULFUR)
10,000 SCFM (TOTAL - 1 BOILER)
START-UP    1/ttO
SULF-X SCORE PROCESS
STATUS - PLANNED-CONTRACT AWARDED
•BKGDt A NEW FGO PROCESS KNOWN AS THE SULF-X CON-
CURRENT OXIDES REMOVAL PROCESS HAS BEEN DEVELOPED
BY PITTSBURGH ENVIRONMENTAL AND ENERGY SYSTEMS,
INC. IT MILL CONTROL 802 EMISSIONS FROM AN EXIST-
ING BOILER AT THE WESTERN CORRECTIONAL INSTITUTE
IN PITTSBURGH.  THE PROJECT IS BEING FUNDED BY
COMMONWEALTH OF PENNSYLVANIA.  MINE ACID WASTES
WILL BE USED AS THE REAGENT TO REMOVE 302 AND NOX
FROM THE FLUE GASES.
*1ST OTR 791 PRELIMINARY TEST OF ABSORPTION SEC-
TION HILL BE PERFORMED IN SEPTEMBER 1979.  START-
UP OF THE FGD SYSTEM IS SLATED FOR EARLY 1980.
                                                IS

-------
                                                                           STATUS TO APRIL  1979
                                          SECTION  4


                     SUMMARY BY VENDOR OF FGD SYSTEMS ON INDUSTRIAL BOILERS
VENDOR
INSTALLATION NAME / LOCATION
                                  CONTROL SYSTEM PROCESS / SCFM
A.D. LITTLE
BUREAU OF MINES
C-E NATCO
CARBORUNDUM ENVIR. SYS. LTD.
CEILCOTE
COMBUSTION EQUIPMENT ASSOC.
ORAVO CORP./NAT'L LIME ASS'N
DUCON COMPANY
ENTOLETER, INC.
FLAKT, INC.
FMC ENVIRONMENTAL EQUIPMENT
GENERAL MOTORS CORPORATION
ST. LOUIS, MISSOURI

ST. JOE ZINC CO.
MUNACA, PENNSYLVANIA

BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA

DOUBLE BARREL OIL CO.
BAKERSFIE.LO, CALIFORNIA

SUN PRODUCTION COMPANY
FELLOWS, CALIFORNIA

SUN PRODUCTION COMPANY
OILDALE, CALIFORNIA

CARBORUNDUM ABRASIVES
BUFFALO, NEW YORK

TEXACO INCORPORATED
SAN ARDO, CALIFORNIA

KERR-MCGEE CHEMICAL CORP.
TRONA, CALIFORNIA

BUNGE, INC.
CAIRO, ILLINOIS

TEXACO INCORPORATED
SAN ARDO, CALIFORNIA

GENERAL MOTORS CORPORATION
DAYTON, OHIO

PHILLIP MORRIS, INC.
CHESTERFIELD, VIRGINIA

ALYESKA PIPELINE SERVICE CO.
VALDEZ, ALASKA

ARCO/POLYMEHS, INC.
MONACA, PENNSYLVANIA

CANTON TtXIILfcS
CANTON, GEORGIA

CATERPILLAR TRACTOR CO.
EAST PEURIA, ILLINOIS

CATERPILLAR TRACTOR CU.
MAPLETON, ILLINOIS

CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS

CATERPILLAR TRACTOR CO.
MOSSVILLE, ILLINOIS

FIRESTONE TIRE AND RUBBER CO.
POTTSTUWN, PENNSYLVANIA

FMC (SODA ASH PLANT)
GREEN RIVER, WYOMING

GENERAL MOTORS CORPORATION
TONOWANDA, NEW YORK
                                  SODIUM HYDROXIDE SCRUBBING
                                  64,000


                                  CITRATE PROCESS
                                  142,000


                                  SODIUM HYDROXIDE SCRUBBING
                                  12,000


                                  SODIUM HYDROXIDE SCRUBBING
                                  12,000


                                  SODIUM HYDROXIDE SCRUBBING
                                  6,000


                                  SODIUM HYDROXIDE SCRUBBING
                                  6,000


                                  LIME SCRUBBING
                                  30,000


                                  SODIUM HYDROXIDE SCRUBBING
                                  347,000


                                  SODIUM CARBONATE SCRUBBING
                                  490,000


                                  LIME SCRUBBING
                                  44,000


                                  SODIUM CARBONATE SCRUBBING
                                  99,000


                                  SODIUM HYDROXIDE SCRUBBING
                                  36,000


                                  SODIUM CARBONATE SCRUBBING
                                  39,000


                                  SODIUM HYDROXIDE SCRUBBING
                                  50,000


                                  DOUBLE ALKALI (CONCENTRATED)
                                  305,000


                                  CAUSTIC WASTE STREAM
                                  2S,OOG


                                  DOUBLE ALKALI (CONCENTRATED)
                                  210,000


                                  DOUBLE ALKALI (CONCENTRATED)
                                  131,000


                                  DOUBLE ALKALI (CONCENTRATED)
                                  105,000


                                  DOUBLE ALKALI (CONCENTRATED)
                                  140,000


                                  DOUBLE ALKALI (CONCENTRATED)
                                  8070


                                  SODIUM CARBONATE SCRUBBING
                                  446,000

                                  SODIUM HYDROXIDE SCRUBBING
                                  92,000
                                              16

-------
                                                                           STATUS TO APRIL  1979
                                    SECTION  4  (CONTINUED)

                     SUMMARY BY VENDOR OF FGD SYSTEMS ON INDUSTRIAL BOILERS
VENDOR


fMC ENVIRONMENTAL EQUIPMENT
CM ENVIRONMENTAL
GREAT WESTERN SUGAR
HEATER TECHNOLOGY
IN-HOUSE DESIGN
KOCH ENGINEERING
M1KROPUL CORPORATION
NEPTUNE AIRPOL INC.
NEPTUNE AIRPOL, INC.
INSTALLATION NAME / LOCATION
6ETTY OIL COMPANY
BAKERSFIELD, CALIFORNIA

SANTA FE ENERGY CORP.
BAKERSFIELO. CALIFORNIA

TRANSCO TEXTILES, INC.
AUGUSTA, GEORGIA

GENERAL MOTORS CORPORATION
PARMA, OHIO

GENERAL MOTORS CORPORATION
PONTIAC, MICHIGAN

NORTHERN OHIO SUGAR COMPANY
FINOLAY, OHIO

NORTHERN OHIO SUGAR COMPANY
FREEMONT, OHIO

BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA

MOBIL OIL COMPANY
BUTTONWILLOM, CALIFORNIA

GETTY OIL COMPANY
BAKERSFIELO, CALIFORNIA

GETTY OIL COMPANY
ORCUTT, CALIFORNIA

MOBIL OIL COMPANY
SAN AROO, CALIFORNIA

PFIZER, INC.
EAST ST. LOUIS* ILLINOIS

CHEVRON U.S.A. INC.
BAKERSFIELD, CALIFORNIA

CHEVRON U.S.A. INC.
BAKERSFIELD, CALIFORNIA

MINN-OAK FARMER'S CO-OPERATIVE
WAHPETON, NORTH DAKOTA

STRATHMORE PAPER COMPANY
WORONOCO, MASSACHUSETTS

INLAND CONTAINER CORPORATION
NEW JOHNSONVILLE, TENNESSEE

GEORGIA-PACIFIC PAPER CO.
CROSSETT, ARKANSAS

GREAT SOUTHERN PAPER CO.
CEDAR SPRINGS, GEORGIA

GRISSOM AIR FORCE BASE
BUNKER HILL, INDIANA

ITT RAYONIER, INC.
FERNANDINA BEACH, FLORIDA

MEAD PAPERBOARD CO.
STEVENSON, ALABAMA
CONTROL SYSTEM PROCESS / SCFM
SODIUM CARBONATE SCRUBBING
72,000

DOUBLE ALKALI (CONCENTRATED)
70,000

SODIUM CARBONATE SCRUBBING
50,000

DOUBLE ALKALI (DILUTE)
126,400

SODIUM HYDROXIDE SCRUBBING
107,300

SODIUM CARBONATE SCRUBBING
65,230

SODIUM HYDROXIDE SCRUBBING
40,000

SODIUM HYDROXIDE SCRUBBING
12,000

SODIUM CARBONATE SCRUBBING
SO,500

SODIUM CARBONATE SCRUBBING
891,000

SODIUM HYDROXIDE SCRUBBING
5000

SODIUM HYDROXIDE SCRUBBING
175,000

LIME SCRUBBING
40,000

SODIUM CARBONATE SCRUBBING
248,000

SODIUM CARBONATE SCRUBBING
146,000

AMMONIA SCRUBBING
164,000

DRY LIME SCRUBBING
22,000

AMMONIA SCRUBBING
154,000

CAUSTIC WASTE STREAM
220,000

CAUSTIC WASTE STREAM
420,000

DOUBLE ALKALI (CONCENTRATED)
32,000

SODIUM HYDROXIDE SCRUBBING
176,000

SODIUM CARBONATE SCRUBBING
100,000
                                               17

-------
                                                                           STATUS TO APRIL  1979
                                    SECTION  4 (CONTINUED)

                     SUMMARY BY VENDOR OF FGD SYSTEMS ON  INDUSTRIAL BOILERS
VENDOR
INSTALLATION NAME / LOCATION
CONTROL SYSTEM PROCESS / SCFM
NEPTUNE AIRPOL* INC,
PITTSBURGH ENV.tENSY. SYSTEMS
RESEARCH-COTTRELL/BAHCO
3HEMCO INC.
THERMOTICS INC.
VENDOR NOT VET SELECTED
N.M. SLY MANUFACTURING CO.
MHEELABRATOR-FRYE/ROCKHELL INT
ZURN INDUSTRIES
NEKOOSA PAPERS, INC.
ASHDOMN, ARKANSAS

REICHHOLD CHEMICALS, INC.
PENSACOLAr FLORIDA

U.S. GYPSUM CORP.
OAKMONTr PENNSYLVANIA

MESTERN CORRECTIONAL INST.
PITTSBURGH, PENNSYLVANIA

RICKENBACKER AIR FORCE BASE
COLUMBUS, OHIO

TEXA8CULF
GRANGERr WYOMING

BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA

C.A.M.(CARBIOE-AMOCO-MONSANTO)
HOUSTON, TEXAS

DUPONT, INC.
ATHENS, GEORGIA

SHELL OIL COMPANY
BAKERSFIELD, CALIFORNIA

SHELL OIL COMPANY
TAFT, CALIFORNIA

TENNECO OIL CO.
GREEN RIVER, WYOMING

HARRIS MINING CO.
SPRUCE PINE, NORTH CAROLINA

8HELLER GLOBE CORP.
NORFOLK, VIRGINIA

CELANESE CORPORATION
CUMBERLAND, MARYLAND

CATERPILLAR TRACTOR CO.
JOLIET, ILLINOIS

CATERPILLAR TRACTOR CO.
MORTON, ILLINOIS
CAUSTIC SCRUBBING
211,000

SODIUM CARBONATE SCRUBBING
60*000

DOUBLE ALKALI (DILUTE)
19,300

SULF-X SCORE PROCESS
10*000

LIMESTONE SCRUBBING
55,000

SODIUM CARBONATE SCRUBBING
140,000

SODIUM HYDROXIDE SCRUBBING
12*000

DOUBLE ALKALI
1,200,000

DOUBLE ALKALI
260,000

PROCESS NOT YET SELECTED
99,000

PROCESS NOT YCT SELECTED
25,000

SODIUM CARBONATE SCRUBBING
140,000

MATER SCRUBBING (NA,NH3 OPTN.)
4*000

SODIUM HYDROXIDE SCRUBBING
S,000

DRV LIME SCRUBBING
50*700

DOUBLE ALKALI (DILUTE)
67*000

DOUBLE ALKALI (DILUTE)
36*000
                                              16

-------
                                                                           STATUS TO APRIL  1979

                                          SECTION  5

                SUMMARY BY CONTROL PKOCE33 OF FGO SYSTEMS ON INDUSTRIAL BOILERS
CONTROL SYSTEM PROCESS
INSTALLATION NAME / LOCATION
VENDOR / SCFM
AMMONIA SCRUBBING
CAUSTIC SCRUBBING
CAUSTIC WASTE STREAM
CITRATE PROCESS
DOUBLE ALKALI
DOUBLE ALKALI (CONCENTRATED)
DOUBLE ALKALI (DILUTE)
DRV LIME SCRUBBING
INLAND CONTAINER CORPORATION
NEW JOHN50NVILLE, TENNESSEE

MINN-DAK FARMER'S CO-OPERATIVE
MAHPETON, NORTH DAKOTA

NEKOOSA PAPERS* INC.
ASHDOWN, ARKANSAS

CANTON TEXTILES
CANTON, GEORGIA

GEORGIA-PACIFIC PAPER CO.
CROSSETT, ARKANSAS

GREAT SOUTHERN PAPER CO.
CEDAR SPRINGS, GEORGIA

ST. JOE ZINC CO.
MONACA, PENNSYLVANIA

C.A.M.(CARBIDE-AMOCO-MONSANTO)
HOUSTON, TEXAS

OUPONT, INC.
ATHENS, GEORGIA

ARCU/POLYMER3, INC.
MONACA, PENNSYLVANIA

CATERPILLAR TRACTOR CO.
EAST PEORIA, ILLINOIS

CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS

CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS

CATERPILLAR TRACTOR CO.
MOSSVILLEt ILLINOIS

FIRESTONt TIRE AND RUBBER CO.
POTT3TOWN, PENNSYLVANIA

GRISSOM AIR FORCE BASE
BUNKER HILL, INDIANA

SANTA FE ENERGY CORP.
BAKERSFItLO, CALIFORNIA

CATERPILLAR TRACTOR CO.
JOLIET, ILLINOIS

CATERPILLAR TRACTOR CO.
MORTON, ILLINOIS

GENERAL MOTORS CORPORATION
PARMA, OHIO

U.S. GYPSUM CORP*
OAKMONT, PENNSYLVANIA

CELANESE CORPORATION
CUMBERLAND, MARYLAND

STRATHMONE PAPER COMPANY
MORONOCO, MASSACHUSETTS
NEPTUNE AIRPOL INC.
151,000

KOCH ENGINEERING
164,000

NEPTUNE AIRPOL, INC.
211,000

FMC ENVIRONMENTAL EQUIPMENT
25,000

NEPTUNE AIRPOL, INC.
220,000

NEPTUNE AIRPOL, INC.
420,000

BUREAU OF MINES
142,000

VENDOR NOT YET SELECTED
I,ZOO,000

VENDOR NOT YET SELECTED
280,000

FMC ENVIRONMENTAL EQUIPMENT
305,000

FMC ENVIRONMENTAL EQUIPMENT
210,000

FMC ENVIRONMENTAL EQUIPMENT
131,000

FMC ENVIRONMENTAL EQUIPMENT
105,000

FMC ENVIRONMENTAL EQUIPMENT
140,000

FMC ENVIRONMENTAL EQUIPMENT
6070

NEPTUNE AIRPOL, INC.
32,000

FMC ENVIRONMENTAL EQUIPMENT
70,000

ZU«N INDUSTRIES
67,000

ZURN INDUSTRIES
38,000

GM ENVIRONMENTAL
126,400

NEPTUNE AIRPOL, INC.
19,300

KHEELABRATOR-FRYE/ROCKKELL INT
50,700

MIKROPUL CORPORATION
22,000
                                               19

-------
                                                                           STATUS TO APRIL  1979

                                    SECTION  5 (CONTINUED)

                SUMMARY BY CONTROL PROCESS OF FGD SYSTEMS ON INDUSTRIAL BOILERS
CONTROL SYSTEM PROCESS
 INSTALLATION NAME / LOCATION
VENDOR / 3CFM
LIME SCRUBBING
LIMESTONE SCRUBBING
PROCESS NOT YET SELECTED
SODIUM CARBONATE SCRUBBING
SODIUM HYDROXIDE SCRUBBING
BUNGEr INC.
CAIRO* ILLINOIS

CARBORUNDUM ABRASIVES
BUFFALO* NEW YORK

PFIZER. INC.
EAST ST. LOUIS* ILLINOIS

RICKENBACKER AIR FORCE BASE
COLUMBUS, OHIO

SHELL OIL COMPANY
BAKERSFIELO* CALIFORNIA

SHELL OIL COMPANY
TAFT, CALIFORNIA

CHEVRON U.S.A. INC.
BAKERSFULD* CALIFORNIA

CHEVRON U.S.A. INC.
BAKERSFIELD, CALIFORNIA

FMC (SODA ASH PLANT)
GREEN RIVER* WYOMING

GETTY OIL COMPANY
BAKERSFIELD* CALIFORNIA

GETTY OIL COMPANY
BAKERSFIELD. CALIFORNIA

KERR-MCGEE CHEMICAL CORP.
TRONA, CALIFORNIA

MEAD PAPERBOARD CO.
STEVENSON* ALABAMA

MOBIL OIL COMPANY
BUTTONWILLOW, CALIFORNIA

NORTHERN OHIO SUGAR COMPANY
FINULAY. OHIO

PHILLIP KORKIS, INC.
CHESTERFIELD. VIRGINIA

REICHHOLD CHEMICALS* INC.
PENSACOLA. FLORIDA

TENNECO OIL CO.
GREEN RIVER* WYOMING

TEXACO INCORPORATED
SAN AKOU. CALIFORNIA

TEXASGULF
GRANGER* WYOMING

TRANSCO TEXTILES, INC.
AUGUSTA, GEORGIA

ALYESKA PIPELINE SERVICE CO.
VALDEZ. ALASKA

BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA
DRAVO CORP./NAT'L LIME ASS'N
44,000

CARBORUNDUM ENVIR. SYS. LTD.
30*000

IN-HOUSE DESIGN
40*000

RESEARCH-COTTRELL/BAHCO
55,000

VENDOR NOT VET SELECTED
99,000

VENDOR NOT YET SELECTED
25,000

KOCH ENGINEERING
348,000

KOCH ENGINEERING
146,000

FMC ENVIRONMENTAL EQUIPMENT
446,000

FMC ENVIRONMENTAL EQUIPMENT
72,000

IN-HOUSE DESIGN
891,000

COMBUSTION EQUIPMENT ASSOC.
490,000

NEPTUNE AIRPOL, INC.
100,000

HEATER TECHNOLOGY
80*500

GREAT WESTERN SUGAR
65*230

FLAKT, INC.
39,000

NEPTUNE AIKPOL, INC.
80,000

VENDOR NOT VET SELECTED
140,000

DUCON COMPANY
99,000

SWEMCU INC.
140,000

FMC ENVIRONMENTAL EQUIPMENT
50.000

FMC ENVIRONMENTAL EQUIPMENT
50.000

C-E NATCO
12,000
                                              20

-------
                                                                           STATUS TO APRIL  1979

                                    SECTION  5  (CONTINUED)

                SUMMARY BY CONTROL PROCESS OF FGO SYSTEMS ON INDUSTRIAL BOILERS
CONTROL. SYSTEM PROCESS
INSTALLATION NAME / LOCATION
VENDOR / SCFM
SODIUM HYDROXIDE SCRUBBING
3ULF-X SCORE PROCESS
MATER SCRUBBING (NA,NH3 OPTN.J
BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA

BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA

DOUBLE BARREL OIL CO.
BAKERSFIELO, CALIFORNIA

GENERAL MOTORS CORPORATION
ST. LOUIS, MISSOURI

GENERAL MOTORS CORPORATION
DAYTON* OHIO

GENERAL MOTORS CORPORATION
TONOMANOA, NEM YORK

GENERAL MOTORS CORPORATION
PONTIACt MICHIGAN

GETTY OIL COMPANY
ORCUTT, CALIFORNIA

ITT RAYONIER, INC.
FERNANOINA BEACH, FLORIDA

MOBIL OIL COMPANY
SAN AROO, CALIFORNIA

NORTHERN OHIO SUGAR COMPANY
FREEMONT, OHIO

SHELLER GLOBE CORP.
NORFOLK, VIRGINIA

SUN PRODUCTION COMPANY
FELLOWS, CALIFORNIA

SUN PRODUCTION COMPANY
OILDALE, CALIFORNIA

TEXACO INCORPORATED
SAN AROO, CALIFORNIA

WESTERN CORRECTIONAL INST.
PITTSBURGH, PENNSYLVANIA

HARRIS MINING CO.
SPRUCE PINE, NOKTH CAROLINA
HEATER TECHNOLOGY
12,000

THERMOTICS INC.
12,000

C-E NATCO
12,000

A.O. LITTLE
64,000

ENTOLETER, INC.
36,000

FMC ENVIRONMENTAL EBUIPMENT
92,000

6M ENVIRONMENTAL
107,300

IN-HOUSE DESIGN
5000

NEPTUNE AIRPOL, INC.
176,000

IN-HOUSE DESIGN
175,000

GREAT WESTERN SUGAR
40,000

W.H. SLY MANUFACTURING CO.
8,000

C-E NATCO
6,000

C-E NATCO
6,000

CEILCOTE
347,000

PITTSBURGH ENV.iENGY. SYSTEMS
10,000

M.M. SLY MANUFACTURING CO.
4,000

-------
                                           SECTION  6

                          OPERATIONAL FGU SYSTEMS ON INDUSTRIAL BOILERS
                                                                            STATUS TO APRIL  1979
COMPANY/LOCATION/FUEL
                                    5CFM
                                                    PROCESS/VENDOR
START UP
  MO/YR
                                                                                        NUMBER
                                                                                        OF F60
                                                                                        SYSTEMS
  NUMBER
OF BOILED
CONTROLLf
ALYESKA PIPELINE SERVICE CO.
VALOEZ, ALASKA
OIL (0.03X - 0.1X SULFUR)
                                   50,000    SODIUM HYDROXIDE SCRUBBING        6/77
                                             FMC ENVIRONMENTAL EQUIPMENT
BELRID6E OIL CO.
MCKITTRICK, CALIFORNIA
CRUDE OIL U.1X SULFUR)
                                   12,000    SODIUM HYDROXIDE SCRUBBING
                                             C-E NATCO
                                                                               1/79
BELRIOGE OIL CO.
MCKITTRICK, CALIFORNIA
OIL (I.IX SULFUR)
                                   12,000    SODIUM HYDROXIDE SCRUBBING
                                             HEATER TECHNOLOGY
                                                                               6/78
BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA
CRUDE OIL (I.IX SULFUR)
                                   12,000
                                             SODIUM HYDROXIDE SCRUBBING
                                             THERMOTICS INC.
                                                                               7/78
CANTON TEXTILES
CANTON, GEORGIA
COAL (0.8X SULFUR)
INTERRUPTIBLE NATURAL GAS
                                   25,000    CAUSTIC WASTE STREAM
                                             FMC ENVIRONMENTAL EQUIPMENT
                                                                               6/74
CATERPILLAR TRACTOR CO.
EAST PEORIA, ILLINOIS
COAL (3.2X SULFUR)
                                   210,000   DOUBLE ALKALI (CONCENTRATED)
                                             FMC ENVIRONMENTAL EQUIPMENT
                                                                               4/7S
CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS
COAL (3.2X SULFUR)
                                   131,000   DOUBLE ALKALI (CONCENTRATED)
                                             FMC ENVIRONMENTAL EQUIPMENT
                                                                               3/79
CATERPILLAR TRACTOR CO.
MOSSVILLE* ILLINOIS
COAL (3.2X SULFUR)
                                   100,000   DOUBLE ALKALI (CONCENTRATED)
                                             FMC ENVIRONMENTAL EQUIPMENT
                                                                              10/79
CATERPILLAR TRACTOR CO.
JOLIET, ILLINOIS
COAL (3.2X SULFURI
                                   67,000    DOUBLE ALKALI (DILUTE)
                                             2URN INDUSTRIES
                                                                               9/74
CATERPILLAR TRACTOR CO.
MORTON, ILLINOIS
COAL (3.2X SULFUR)
                                   38,000    DOUBLE ALKALI (DILUTE)
                                             ZURN INDUSTRIES
                                                                               1/78
CHEVRON U.S.A. INC.
BAKERSFIELD, CALIFORNIA
OIL (1.1X SULFUR)
                                   248,000   SODIUM CARBONATE SCRUBBING        7/78
                                             KOCH ENGINEERING
                                                                                                      18
DOUBLE BARREL OIL CO.
BAKERSFIELO, CALIFORNIA
OIL (1.1X SULFUR)
                                   12,000    SODIUM HYDROXIDE SCRUBBING
                                             C-E NATCO
                                                                               6/78
FIRESTONE TIRE AND RUBBER CO.
PUTTSTONN, PENNSYLVANIA
COAL (2.5 - 3.OX SULFUR) /
                                   8070      DOUBLE ALKALI (CONCENTRATED)      1/75
                                             FMC ENVIRONMENTAL EQUIPMENT
                                               22

-------
                                     SECTION  6  (CONTINUED)

                          OPERATIONAL FGD SYSTEMS ON  INDUSTRIAL  BOILERS
                                                                             STATUS TO APRIL  1979
COMPANY/LOCATION/FUEL
 SCFM
       PROCESS/VENDOR
                                         START UP
                                           MO/YR
                                                                                         NUMBER
                                                                                         OF  FGD
                                                                                         SYSTEMS
  NUMBER
OF BOILERS
CONTROLLED
FMC (SODA ASH PLANT)
GREEN RIVER.  WYOMING
COAL (IX SULFUR)
446*000   SODIUM CARBONATE SCRUBBING        5/76
          FMC ENVIRONMENTAL EQUIPMENT
GENERAL MOTORS CORPORATION
PARMA*  OHIO
COAL (2.5X  SULFUR)
128,400   DOUBLE ALKALI  (DILUTE)
          GM ENVIRONMENTAL
                                  3/74
GENERAL MOTORS CORPORATION
ST. LOUIS*  MISSOURI
COAL (3.2X  SULFUR)
64,000    SUDIUM HYDROXIDE SCRUBBING
          A.D. LITTLE
                                                                                0/72
GENERAL MOTORS CORPORATION
OAYTONi OHIO
COALC0.7X • 2.UX SULFUR)
36*000    SODIUM HYDROXIDE SCRUBBING
          ENTOLETER*  INC.
                                                                                9/74
GENERAL MOTORS CORPORATION
TONONANOA,  NEW YORK
COAL (1.2X  SULFUR)
92,000
SUDIUM HYDROXIDE SCRUBBING
FMC ENVIRONMENTAL EQUIPMENT
                                                                                6/75
GENERAL MOTORS CORPORATION
PONTIAC, MICHIGAN
COAL (0.64X SULFUR)
ALSO MOOD*  PAPER, AND CARDBOARD.
107,300   SODIUM HYDROXIDE  SCRUBBING
          GM ENVIRONMENTAL
                                                                                4/76
GEORGIA-PACIFIC PAPER CO.
CROS3ETT, ARKANSAS
BARK,COAL/OIL (l.SX - 2.OX SULFUR)
220,000   CAUSTIC WASTE  STREAM
          NEPTUNE AIRPOL,  INC.
                                                                                7/75
GETTY OIL COMPANY
BAKEH8FIELO,  CALIFORNIA
OIL (1.1X SULFUR)
72,000    SODIUM CARBONATE  SCRUBBING        6/77
          FMC ENVIRONMENTAL EQUIPMENT
GETTY OIL COMPANY
BAKERSF1ELD,  CALIFORNIA
OIL (1.1X SULFUR)
891,000   SODIUM CARBONATE  SCRUBBING        12/7B
          IN-HOUSE  DESIGN
                                                                                                       81
GETTY OIL COMPANY
ORCUTT* CALIFORNIA
OIL (4.OX SULFUR)
5000      SODIUM HYDROXIDE  SCRUBBING
          IN-HOUSE  DESIGN
                                                                                6/77
GREAT SOUTHERN PAPER CO.
CEOAR SPRINGS, GEORGIA
BARK,COAL/OIL (l.OX - 2.UX SULFUR)
420,000   CAUSTIC  WASTE  STREAM
          NEPTUNE  AIRPOL,  INC.
                                                                                0/75
 ITT RAYUN1ER, INC.
 FERNANDINA BEACH, FLORIDA
 BARK,OIL (2.OX - 2.5X SULFUR)
176,000    SODIUM  HYDROXIDE  SCRUBBING
           NEPTUNE AIRPOL*  INC.
                                                                                0/7S
 KERR-MCGEE CHEMICAL COUP.
 TRONA, CALIFORNIA
 COKE/COAL/OIL (0.5X - 5.OX SULFUK)
                                    49U,000
           SODIUM  CARBONATE  SCRUBBING
           COMBUSTION  EQUIPMENT  AS30C.
                                                                                6/78

-------
                                     SECTION  6 (CONTINUED)

                          OPERATIONAL F60 SYSTEMS ON INDUSTRIAL BOILERS
                                                                            STATUS TO APRIL  1979
COMPANY/LOCATION/FUEL
                                    SCFM
                                                    PROCESS/VENDOR
                                                                            START UP
                                                                              MO/YR
                                                     NUMBER
                                                     OF  F6D
                                                     SYSTEMS
  NUMBER
OF BOILER
CONTROLLE
HEAD PAPERBOARO CO.
STEVENSON, ALABAMA
OIL C1.5X - JX SULFUR)
100,000   SODIUM CARBONATE  SCRUBBING        0/75
          NEPTUNE AIRPOL,  INC.
MINN-DAK FARMER'S CO-OPERATIVE
MAHPETON, NORTH DAKOTA
LIGNITE Cl.OX SULFUR)
164,000   AMMONIA SCRUBBING
          KOCH ENGINEERING
                                                                               6/77
MOBIL OIL COMPANY
SAN AROO, CALIFORNIA
OIL (2.OX - 2.25X SULFUR)
175,000   SODIUM HYDROXIDE SCRUBBING
          IN-HOUSE DESIGN
                                                                               0/74
                                                                                          28
                                                                   28
NEKOOSA PAPERS,  INC.
A3HOONN, ARKANSAS
COAL  (U -  1.5X  SULFUR)
211,000   CAUSTIC SCRUBBING
          NEPTUNE A1RPOL,  INC.
                                                                               2/76
NORTHERN OHIO SUGAR COMPANY
FREEMONT, OHIO
COAL  (IX SULFUR)
40,000    SODIUM HYDROXIDE SCRUBBING       10/75
          GREAT WESTERN SUGAR
PFIZER,  INC.
EAST  ST. LOUIS,  ILLINOIS
COAL  (3.5X  SULFUR)
                                   40,000
          LIME SCRUBBING
          IN-HOUSE DESIGN
                                                                               9/78
REICHHOLD  CHEMICALS,  INC.
PEN3ACOLA,  FLORIDA
MOOD  «  OIL  <2X  SULFUR)
60,000    SODIUM CARBONATE SCRUBBING
          NEPTUNE AIRPOL, INC.
                                                                               6/75
RICKENBACKER  AIR  FORCE  BASE
COLUMBUS,  OHIO
COAL  (3.6X SULFUR)
55,000    LIMESTONE SCRUBBING
          RESEARCH-COTTRELL/BAHCO
                                                                               3/76
 TEXACO  INCORPORATED
 SAN  ARDO,  CALIFORNIA
 OIL  (1.7X  SULFUR)
347,000   SODIUM HYDHUXIDE SCRUBBING
          CEILCOIE
                                                                               11/73
                                                                                                      29
 TEXASGULF
 GRANGER, WYOMING
 COAL  (0.75X  SULFUR)
140,000   SODIUM CARBONATE SCRUBBING
          SWEMCO INC.
                                                                                9/76

-------
                                            SECTION  7

                              FUTURE  F6D SYSTEMS ON INDUSTRIAL BOILERS

                                        UNDER  CONSTRUCTION
                                                                             STATUS TO APRIL  1979
COMPANY/LOCATION/FUEL
 SCFH
PROCESS/VENDOR
START UP
  MO/YR
NUMBER
OF FGD
SYSTEMS
  NUMBER
OF BOILERS
CONTROLLED
 ARCO/POLVMERS, INC.
 KONACA, PENNSYLVANIA
 COAL (3.OX SULFUR)
305,000   DOUBLE ALKALI (CONCENTRATED)
          FMC ENVIRONMENTAL EQUIPMENT
                           6/SO
CHEVRON U.S.A. INC.
0AKERSFIELD, CALIFORNIA
OIL (1.IX SULFUR)
146,000   SODIUM CARBONATE SCRUBBING
          KOCH ENGINEERING
                           7/79
                          12
 BRI3SOM AIR FORCE BASE
 BUNKER HILL, INDIANA
 COAL (3.OX - 3.5X SULFUR)
32,000    DOUBLE ALKALI (CONCENTRATED     11/79
          NEPTUNE AIRPOL, INC.
 INLAND CONTAINER CORPORATION
 MEN JOHNSONVILLE, TENNESSEE
 HOOD/SPENT LIQUOR «3.0X SULFUR)
194,000   AMMONIA SCRUBBING
          NEPTUNE AIRPOL INC.
                           5/79
 MOBIL OIL COMPANY
 BUTTONMILLOW, CALIFORNIA
 OIL (1.1* SULFUR)
60,500    SODIUM CARBONATE SCRUBBING
          HEATER TECHNOLOGY
                                                                                4/79
 PHILLIP MORRIS* INC.
 CHESTERFIELD, VIRGINIA
 COAL (1*«X SULFUR DESIGN)
39,000    SODIUM CARBONATE SCRUBBING
          FLAKT, INC.
                                                                                6/79
 SANTA FE ENERGY CORP.
 BAKER8FIELD, CALIFORNIA
 OIL  (1.3* SULFUR)
70,000    DOUBLE ALKALI (CONCENTRATED)      5/79
          FMC ENVIRONMENTAL EQUIPMENT
 IT. JOE ZINC CO.
"NOHACA, VEWSYLVANI A
'COAL'U.SX • 4.SX SULFUR)
142,000   CITRATE PROCESS
          BUREAU Or MINE*
                                                                                4/79
 STRATHMORE PAPER COMPANY
 NORONOCO, MASSACHUSETTS
 COAL/OIL (0.75-3.OX SULFUR)
22,000    DRY LIME SCRUBBING
          MIKROPUL CORPORATION
                                                                                5/79
 SUN PRODUCTION COMPANY
 FELLOWS, CALIFORNIA
 OIL (1.4X SULFUR)
6,000     SODIUM HYDROXIDE SCRUBBING
          C-E NATCO
                                                                                5/79
 SUN PRODUCTION COMPANY
 OILDALE, CALIFORNIA
 OIL (1.2X SULFUR)
6,000     SODIUM HYDROXIDE SCRUBBING
          C-E NATCO
                                                                                4/79
 TEXACO INCORPORATED
 SAN ARDO, CALIFORNIA
 OIL (1.7X SULFUR)
99,000    SODIUM CARBONATE SCRUBBING        3/79
          OUCON COMPANY
                                                25

-------
                                     SECTION  7 (CONTINUED)

                             FUTURE FGO SYSTEMS ON INDUSTRIAL BOILERS

                                             PLANNED
                                                                            STATUS TO APRIL  1979
COMPANY/LOCATION/FUEL
 SCFM
       PROCESS/VENDOR
START UP
  MO/YR
NUMBER
OF F6D
SYSTEMS
  NUMBER
OF BOILERI
CONTROLLEI
CARBORUNDUM ABRASIVES
BUFFALOr NEH YORK
COAL (2.2X SULFUR)
30,000    LIME SCRUBBIN6                    0/60
          CARBORUNDUM ENVIR. SYS. LTD*
CATERPILLAR TRACTOR CO,
MAPLETON, ILLINOIS
COAL (3.2* SULFUR)
105,000   DOUBLE ALKALI (CONCENTRATED)      1/80
          FMC ENVIRONMENTAL EQUIPMENT
CELANESE CORPORATION
CUMBERLAND* MARYLAND
COAL (1.0-2.OX SULFUR)
50,700    DRY LIME SCRUBBING               12/79
          WHEELABRATOR-FKYE/KOCKMELL INT
WESTERN CORRECTIONAL INST.
PITTSBURGH, PENNSYLVANIA
COAL (3.SX SULFUR)
10,000    SULF-X SCORE PROCESS              I/SO
          PITTSBURGH ENV.tENBV. SYSTEMS
TENNECO OIL CO.
6REEN RIVER, WYOMING
COAL (1.51 SULFUR, MAXIMUM)
140,000   SODIUM CARBONATE SCRUBBING
          VENDOR NOT YET SELECTED
C.A.M.(CARBIDE-AMOCO-MONSANTO)
HOUSTON, TEXAS
FUEL NOT VET SELECTED
1,200,000 DOUBLE ALKALI
          VENDOR NOT YET SELECTED
                                  0/S4
OUPONT, INC.
ATHENS, GEORGIA
COAL (l.SX SULFUR)
280,000   DOUBLE ALKALI
          VENDOR NOT YET SELECTED
                                 12/85
SMELL OIL COMPANY
BAKERSFIELOr CALIFORNIA
OIL (1.1X SULFUR)
99,000
PROCESS NOT YET SELECTED
VENDOR NOT YET SELECTED
   O/ 0
SHELL OIL COMPANY
TAFT, CALIFORNIA
OIL  (1.1X SULFUR)
23,000    PROCESS NOT YET SELECTED
          VENDOR NOT YET SELECTED
                                  O/ 0
                                               2ft

-------
                                                                           STATUS TO APRIL  1979

                                          SECTION  a

              SUMMARY OF DISPOSAL PRACTICES FOR F6D SYSTEMS ON INDUSTRIAL BOILERS
INSTALLATION NAME / LOCATION
STATUS/COMMENTS
ALKALINE SULFITE/BISULFITE RECYCLED TO PULP PROCESS
MEAD PAPERBOARD CO.
STEVENSON* ALABAMA
NEKOOSA PAPERS* INC.
A8HDONN, ARKANSAS
OPERATIONAL
RECOVERED SOLUTION USED AS MAKE-UP TO COOKING LIBUOR IN PULP
MILL.

OPERATIONAL
802 RECOVERED FROM SODIUM SULFITE/8ULFATE LIQUOR AND RE-
CYCLED TO PULPIN6 PROCESS.
CLOSED LOOP - UNTREATED SCRUBBING LIQUOR RECYCLED
INLAND CONTAINER CORPORATION
NEN JOHNSONVILLE* TENNESSEE
CONSTRUCTION
AMMONIUM SULFITE/BISULFITE RECYCLED TO PULP PROCESS
RECOVERED SOLUTION USED AS MAKE-UP TO COOKIN6 LIQUOR
IN THE PULP MILL.
OENATERED SLURRY TO LANDFILL
ARCO/POLYMERS, INC.
MONACAi PENNSYLVANIA
BUNGE* INC.
CAIRO* ILLINOIS

CATERPILLAR TRACTOR CO.
EAST PEORIA, ILLINOIS

CATERPILLAR TRACTOR CO.
MAPLETON* ILLINOIS

CATERPILLAR TRACTOR CO.
MOSSVILLE* ILLINOIS

CATERPILLAR TRACTOR CO.
JOLIET* ILLINOIS

CATERPILLAR TRACTOR CO.
MORTON, ILLINOIS

CATERPILLAR THACTOR CO.
MAPLETON, ILLINOIS

DUPONT, INC.
ATHENS* GEORGIA

FIRESTONE TIRE AND RUBBER CO.
POTTSTOMN* PENNSYLVANIA

GENERAL MOTORS CORPORATION
PARMA* OHIO

GENERAL MOTORS CORPORATION
PONTIAC* MICHIGAN

GRIS30M AIR FORCE bASE
BUNKER HILL* INDIANA

PFIZER* INC.
EAST ST. LOUIS, ILLINOIS

SANTA FE ENERGY CORP.
BAKERSFIELD* CALIFORNIA
CONSTRUCTION
FLYA8H ADDITION TO DENATERED CA80J/CA804 FILTER CAKE*
THEN TO LANDFILL.

INDEFINITELY SHUT DOWN
OPERATIONAL
60*1 SOLIDS (CAS04) SLUDGE DIRECTLY TO LANDFILL

OPERATIONAL
*0+X SOLIDS (CA894) SLUDGE DIRECTLY TO LANDFILL

OPERATIONAL
60+1 SOLIDS (CA304) SLUDGE DIRECTLY TO LANDFILL

OPERATIONAL
OPERATIONAL
PLANNED-CONTRACT AWARDED
60+X SOLIDS (CA304) SLUDGE DIRECTLY TO LANDFILL.

PLANNED-CONSIDERING 302 CONTROL
OPERATIONAL
OPERATIONAL
50»X SOUOS (CA303/S04) SLUDGE TO DRYING POND AND LANDFILL

OPERATIONAL
SX SOLIDS SLURRY DENATERED AND TO LANDFILL

CONSTRUCTION
OPERATIONAL


CONSTRUCTION
                                              27

-------
                                                                           STATUS TO APRIL  1979

                                    SECTION  S (CONTINUED)

              SUMMARY OF DISPOSAL PRACTICES FOR F60 SYSTEMS ON INDUSTRIAL BOILERS
INSTALLATION NAME / LOCATION
STATUS/COMMENTS
OEMATERED SLURRY TO LANDFILL
UtSt SYPSUM CORP.
OAKMONT, PENNSYLVANIA
NEVER STARTED-UP
SLUD6E TO POND FOR DRYING.  THEN TO LANDFILL.
HOLDING POND FOR EVAPORATION
PMC (SODA ASH PLANT)
CREEN RIVER, WYOMING
6CTTV OIL COMPANY
BAKERSFIELO, CALIFORNIA
KERR-MCGEE CHEMICAL CORP.
TRONA, CALIFORNIA
MOBIL OIL COMPANY
SAN AROOi CALIFORNIA

NOBIL OIL COMPANY
BUTTONWILLOW, CALIFORNIA

SUN PRODUCTION COMPANY
FELLOWS, CALIFORNIA

BUN PRODUCTION COMPANY
OILDALE, CALIFORNIA

TENNECO OIL CO.
GREEN RIVER* WYOMING
OPERATIONAL
NA2803/S04 LIOUOR DISPOSED TO COLLECTION POND • NO PRIOR
AERATION.  LANDFILL IN THE FUTURE

OPERATIONAL
6 6PM BLEEOOFF TO A SLOWDOWN TANK.  THE SLOWDOWN IS THEN
SENT TO A DISPOSAL POND ONCE A WEEK.

OPERATIONAL
SCRUBBER EFFLUENT IS CLARIFIED AND THEN PUT INTO A MINERAL
DEPOSIT.

OPERATIONAL
CONSTRUCTION
INTERMITTENT SLOWDOWN TO WASTE DISPOSAL SITE.

CONSTRUCTION
1 GPM BLEEDOFF TO DISPOSAL POND

CONSTRUCTION
1 GPM BLEEOOFF TO DISPOSAL POND

PLANNED-REQUESTING/EVALUATING BIDS
NON-FIXATED SLURRY TO LINED PONO
CANTON TEXTILES
CANTON, GEORGIA

DOUBLE BARREL OIL CU.
BAKERSFIELD, CALIFORNIA

GETTY OIL COMPANY
ORCUTT, CALIFORNIA
OPERATIONAL
NA S03/S04 LIOUOH DISPOSED TO LINED HOLDING PONDS

OPERATIUNAL
1.5 GPM bLEED-UFF STREAM TO SETTLING POND.

OPERATIONAL
1.4 GPM TO SETTLING POND, DEEPNELL INJECTED.
GREAT SOUTHERN PAPER CO.
CEOAR SPRINGS, GEORGIA

RICKENBACKER AIR FORCE BASE
COLUMBUSr OHIO
OPERATIONAL
CLARIFICATION FOLLOWED BY PONOING AND DISCHARGE TO RIVEN

OPERATIONAL
UNSTABILI2ED CAS03/S04 SLUDGE TO LINED PONO
REGENERABLE • ELEMENTAL SULFUR PRODUCT
ST. JOE ZINC CO.
MONACA, PENNSYLVANIA

NE3TERN CORRECTIONAL INST.
PITTSBURGH, PENNSYLVANIA
                                    CONSTRUCTION
PLANNED-CONTRACT AWARDED

-------
                                                                           STATUS TO APRIL  1979

                                    SECTION  a  (CONTINUED)

              SUMMARY OF DISPOSAL PRACTICES FOR F6D SYSTEMS ON INDUSTRIAL BOILERS
INSTALLATION NAME / LOCATION
STATUS/COMMENTS
NASTEMATER TREATMENT AND DISCHARGE TO CITY SEWER
GENERAL MOTORS CORPORATION
ST. LOUIS, MISSOURI
GENERAL MOTORS CORPORATION
DAYTON* OHIO
GEORGIA-PACIFIC PAPER CO.
CR08SETT. ARKANSAS

NORTHERN OHIO SU6AR COMPANY
FREEMONTt OHIO

NORTHERN OHIO SUGAR COMPANY
FINOLAY, OHIO
OPERATIONAL .
NA2S03 OXIDIZED TO NA2304, PH NEUTRALIZED AND DISCHARGED TO
CITY SENER SYSTEM

OPERATIONAL
NA2303/304 LIQUOR AT 35 6PM TO ON-SITE CLARIFICATION AND
DEWATERING FACILITY

OPERATIONAL
OPERATIONAL
TERMINATED
BLEED-OFF STREAM TO HOLDING TANK
WASTEWATER TREATMENT AND DISCHARGE TO RIVER


TRANSCO TEXTILES, INC.              INDEFINITELY SHUT DOWN
AUGUSTA, GEORGIA                    NA2S03/S04 LIQUOR DISCHARGED TO A HOLDING POND


WASTEWATER TREATMENT AND DISCHARGE TO TAILINGS POND


CHEVRON U.S.A. INC.                 OPERATIONAL
BAKER8FIELD, CALIFORNIA

GETTY OIL COMPANY  .                 OPERATIONAL
BAKER8FIELD, CALIFORNIA             HOLDING POND FOR EVAPORATION.
                                    9 GPM BLEEDOFF TO A SLOWDOWN TANK.   THE BLOWDOWN IS EMPTIED
                                    INTO A DISPOSAL POND ONCE  A WEEK.

ITT RAYONIER, INC.                  OPERATIONAL
FERNANblNA BEACH, FLORIDA

REICHHOLD CHEMICALS, INC.           OPERATIONAL
PENSACOLA, FLORIDA


WASTEWATER TREATMENT
ALYESKA PIPELINE SERVICE CO.
VALOEZ, ALASKA
BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA

BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA

CARBORUNDUM ABRASIVES
BUFFALO, NEW YORK

CHEVRON U.S.A. INC.
BAKERSFIELD, CALIFORNIA

GENERAL MOTORS CORPORATION
TONOWANDA, NEW YORK
OPERATIONAL
SLUDGE MIXED WITH BALLAST WATER FROM TANKERS IN PORT
VALDEZ AND TREATED IN MASTEWATER TREATMENT FACILITY.

OPERATIONAL
OPERATIONAL
PLANNED-CONTRACT AWARDED
CONSTRUCTION
OPERATIONAL
FLY ASK AND NA2503/S04 WASTE LIQUOR DEWATERED AND THEN TO
SANITARY LANDFILL

-------
                                                                           STATUS TO APRIL  1979

                                    SECTION  6 (CONTINUED)

              SUMMARY OF DISPOSAL PRACTICES FOR FGD SYSTEMS ON INDUSTRIAL BOILERS
INSTALLATION NAME / LOCATION
STATUS/COMMENTS
MA8TENATER TREATMENT


MINN-DAK FARMER'S CO-OPERATIVE      OPERATIONAL
WAHPETON, NORTH DAKOTA              BLEED STREAM GOES TO AN ACTIVATED SLUDGE SYSTEM 8 160 6PM
                                    ANAEROBIC DIGESTION* FOLLOWED BY AN OPEN POND* FOLLOWED BY
                                    AEROBIC DIGESTION.

TEXACO INCORPORATED                 OPERATIONAL
SAN ARDOf CALIFORNIA                HALF OF THE SCRUBBER UNDERFLOW IS TREATED AND RECYCLED AS
                                    BOILER FEEDNATERf THE OTHER HALF GOES TO NA8TEMATER
                                    DISPOSAL WELLS.

TEXASGULF                           OPERATIONAL
GRANGER* WYOMING


OVERFLOW TO 3EHER/SLUDGE TO LANDFILL


SHELLER GLOBE CORP.                 INDEFINITELY SHUT DOWN
NORFOLK* VIRGINIA


DISPOSAL TECHNIQUE NOT KNOWN


C.A.M.CCARBIDE-AMOCO-MONSANTO)      PLANNED-CONSIDERING S02 CONTROL
HOUSTON* TEXAS

HARRIS MINING CO.                   INDEFINITELY SHUT DOWN
SPRUCE PINE* NORTH CAROLINA

SHELL OIL COMPANY                   PLANNED-CONSIDERING 802 CONTROL
BAKERSFIELD* CALIFORNIA

SHELL OIL COMPANY                   PLANNED-CONSIDERING 302 CONTROL
TAFT, CALIFORNIA


SCRUBBER EFFLUENT DISPOSED OF IN HASTE NELLS'


TEXACO INCORPORATED                 CONSTRUCTION
SAN AROO. CALIFORNIA


DRY HASTE IS TRUCKED TO A DUMPING AREA
CELANESE CORPORATION
CUMBERLAND* MARYLAND

STRATHMORE PAPER COMPANY
WORONOCO. MASSACHUSETTS
PLANNED-CONTRACT AWARDED
CONSTRUCTION
                                              30

-------
                                                                               STATUS TO APRIL


                                              SECTION  <»


               PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS UN INDUSTRIAL BOILERS
    INSTALLATION NAME


    INSTALLATION LOCATION


    SOURCE CHARACTERISTICS


    SOURCE RATING


    NUMBER OF SEPARATE FGO UNITS


    NUMBER OF BOILERS BE INS CONTROLLED


    SOURCE CAPACITY







    CONTROL SYSTEM VENDOR


    CONTROL PROCESS


    NEW /  RETROFIT


    START-UP DATE


    CONTROL SYSTEM STATUS


    802 REMOVAL EFFICIENCY


    PARTICULATE REMOVAL EFFICIENCY


    MATER  MAKE-UP


    SLUDCE OR BY-PRODUCT DISPOSAL
    CONTROL SYSTEM COST
ALYESKA PIPELINE SERVICE CO.


VALDEZ, ALASKA


OIL (0.03X - 0.11 SULFUR)


50,000 SCFM (DESIGN MAXIMUM)


 1


 3


35 MW  (EQUIVALENT)


(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM * I EQUIVALENT I

THIS IS BECAUSE GAS FLOrt RATE IS THE PRIMARY FACTOR IN MODULE SIZING,


FMC ENVIRONMENTAL EQUIPMENT


SODIUM HYDROXIDE SCRUBBING


NEW


JUNE,  1977


OPERATIONAL


96+X (150-160 PPM » INLET)


PARTICULATE EMISSIONS MEET NSPS.


2 SPh - OPEN LOOP


WASTEWATER TREATMENT


SLUDGE MIXED NlTH BALLAST MATER FROM TANKERS IN PORT


VALDEZ AND TREATED IN WASTEMATER TREATMENT FACILITY.


SEE SECTION IS FOR DETAILED ECONOMIC INFORMATION
                                        BTCKWOUND INFORMATION


       AT  THE  VALOEZ TERMINAL OF THE ALASKAN OIL PIPELINE, ALYESKA PIPELINE SERVICE COMPANY OPERATES


  THE OIL  STORAGE  ANO TRANSFER FACILITY.  OIL FLOWING IN FROM THE PIPELINE IS TEMPORARILY STORED IN


  HUGE TANK  FARMS,  THEN TRANSFERRED FROM THE TANKS TO OIL TANKER SHIPS IN NEARBY PORT VALDEZ;


  ALYESKA  NEEDED NEUTRAL BLANKET AIR FOR THE OIL STORAGE TANKS, A LOM OXYGEN CONTENT BEING PARTICULAR-


 ,LY DESIRABLE.  IT HAS DETERMINED THAT ON-SITE BOILER FLUE GAS MOULD HAVE THE REQUIRED LOW OXYGEN


  CONTENT.  CORROSION PREVENTION IN THE OIL STORAGE TANKS DICTATED THE NEED FOR S02 CONTROLS.
v

  THAT IS» THExDEVICE HAS NOT INSTALLED TO MEET AN EMISSIONS REGULATION.  NEVERTHELESS, THE


  •INERT GAS*  SYSTEM IS BASICALLY A SODIUM HYDROXIDE FGD SYSTEM AND WAS DESIGNED ANO INSTALLED BY


  FMC ENVIRONMENTAL EQUIPMENT DIVISION.


       THE BOILERS DO NOT OPERATE AT STEADY STATE CONDITIONS.  THIS IS DUE TO THE FACT THAT WHEN OIL


  IS REMOVED FROM  THE TANKS AT A FASTER RATE THAN IT IS BEING FED BY THE PIPELINE, AN ADDITIONAL INERT


  AIR BLANKET  IS NEEDED.  THIS REQUIRES INCREASING THE BOILER LOAD FROM THE NORMAL LEVEL OF PLANT


  POWER PRODUCTION TO RUN THE COMPRESSORS ANO PRODUCE ADDITIONAL GAS FOR BLANKET PRODUCTION.


  IF THE TANKS ARE  FILLING FASTER THAN THEY ARE BEING EMPTIED, THE AIR FORCED OUT BV THE INCOMING


  OIL IS INCINERATED.
                                                  31

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9  (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL F6D SYSTEMS ON INDUSTRIAL BOILERS



ALYESKA PIPELINE SERVICE CO.I VALDEZ, ALASKA (CONTINUED)






     THE BOILER PLANT AT THE VALDEZ TERMINAL CONSISTS OF THREE 250 MM BTU/HR OIL-FIRED BOILERS,




MANUFACTURED BY COMBUSTION-ENGINEERING.  THE OIL BEING USED IN THE BOILERS PRODUCES A VERY LOW




PARTICULATE GRAIN LOADING, AND HAS AN EXTREMELY LOW SULFUR CONTENT WHICH RANGES FROM 0.03X TO 0.1*.




THERE IS NO PARTICULATE CONTROL OTHER THAN WHAT OCCURS IN THE FMC S02 ABSORBER MODULE.



    FLUE -GAS FROM THE BOILERS IS HEADEREO INTO FOUR PARALLEL FIN/FAN COOLERS IN WHICH THE GAS




PASSES THROUGH NARROW FIN TUBES WHILE AN EXTERNAL FAN BLOWS COOL AIR AGAINST THEM.  THE COOLER IS




STAINLESS STEEL AND CAUSES A PRESSURE DROP OF 0.5 TO 1 PSI.  SINCE FLUE GAS IS PULLED THROUGH THE



THE SYSTEM UNDER NEGATIVE PRESSURE BY COMPRESSORS (DOWNSTREAM OF THE FGD SYSTEM) RATED AT 25 PSIG.



THE HIGH PRESSURE DROP IS NOT A PROBLEM.  FOLLOWING THE FIN TUBES, THE GAS IS TAKEN THROUGH A 48 IN.




DUCT BEFORE BEING DIRECTED TO ONE OF THE TWO PARALLEL SCRUBBING UNITS.




     THE MAXIMUM DESIGN CAPACITY OF THE SCRUBBER MODULE IS SO,000 SCFM, WHICH REPRESENTS ABOUT 2SX




OF THE TOTAL FLUE GAS GENERATED.  THE S02 CONTROL SYSTEM IS DESIGNED WITH 100X REDUNDANCY, THAT IS,




ONLY ONE OF TWO MODULES IN PARALLEL IS USED AT ANYTIME.  THE MODULES ARE IDENTICAL FOUR-STAGE



OISC-ANO-OONUT TRAY TYPE ABSORBERS WITH A MAXIMUM RECIRCULATION RATE OF 600 GPM AND A L/G RATIO



OF 12 GAL/1000 ACF.  A 4000 GALLON RECIRCULATION TANK IS LOCATED IN THE BOTTOM OF EACH MODULE.




THE ABSORBERS ARE STAINLESS STEEL-CLAD AND HAVE MESH-TYPE MIST ELIMINATORS.  FLUE GAS EXITING THE




ABSORBERS PASSES THROUGH A KNOCK-OUT DRUM (8 FT OIA X 16 FT LONG) WHERE ADDITIONAL MIST SEPARATION



OCCURS.  FINALLY THE GAS STREAM IS HEAOERED INTO FIVE PARALLEL COMPRESSORS WHICH DRIVE THE GAS TO




THE TANK FARMS AND MAINTAIN A POSITIVE PRESSURE IN THE OIL STORAGE TANKS.  GAS INLET TO THE TANKS



IS REGULATED BY PRESSURE CONTROL VALVES WHICH MAINTAIN A GAGE PRESSURE OF 0.6 TO 1.0 IN. W.G.




INSIDE THE TANKS.




    IN ADDITION TO THE PRIMARY 600 GPM RECIRCULATION LINE, A SMALLER SECOND LOOP EXISTS FOR SCRUBBER



BLEED-OFF AND REAGENT MAKE-UP.  JUST DOWNSTREAM OF THE 2 HP RECIRCULATION PUMP, A 10 GPM BLEED



STREAM IS TAKEN TO THE ONSITE OIL TANKER BALLAST WATER TREATMENT FACILITY.  MAKE-UP SUDIUM




HYDROXIDE IS ADDED JUST DOWN STREAM OF THE BLEED-OFF POINT.  CONTROL PH 6.0 IS HIGHER THAN THE




DESIGN PH 6.5 BECAUSE THE OPERATIONS HAVE INDICATED THAT A HIGHER PH IS DESIRABLE.




     REFER TO FIGURE 14-1 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.








                                        OPERATING HISTORY




3RD 8UARTER-1977    CORROSION HAS OCCURRED IN THE PIPING FOR THE WATER RECIRCULATION SYSTEM.




AT THE TIME OF THIS REPORT, THE CAUSE MAS NOT KNOWN.  ALYESKA TESTS HAVE DEMONSTRATED ABOUT



5 PPM S02/S03/S04 AT THE ABSORBER OUTLET.  INLET 302 CONCENTRATION RANGES FROM 150 TO 160 PPM.




THE SYSTEM MAS THEREFORE REMOVING ABOUT 961 OF THE INLET SULFUR OXIDES.  AT THE TIME OF THIS REPORT,




THERE WAS NO CONTINUOUS S02 MONITOR ON THE SYSTEM.






4TH OUARTER-1977    THE CONTROL SYSTEM OPERATED NEARLY PROBLEM-FREE, WITH NO DOWNTIME




BEING ASSIGNED TO THE 302 REMOVAL SYSTEM.  THE CURRENT LOAD IS APPROXIMATELY 201 OF DESIGN








                                                32

-------
                                                                             STATUS TO APRIL  1979




                                      SECTION  9 (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS




ALYESKA PIPELINE SERVICE CO.; VALOEZ, ALASKA (CONTINUED)






CAPACITY.  THIS IS A RESULT OF OIL FLOW BEING LOrt AT PRESENT.  PLANS WERE BEING MADE TO DEAL WITH




THE MET AREAS CORROSION PROBLEM BY INTRODUCING NEUTRALIZING AMINE SPRAYS.








1ST OUARTER-1978    DURING THIS PERIOD, THE CORROSION PROBLEM WAS ALLEVIATED BY SPRAYING HYORAZ1NE




INTO THE SYSTEM UPSTREAM OF THE MIST ELIMINATOR.  THIS MEASURE RAISED FROM 4 TO 6.5 THE PH OF THE




LIQUOR RECOVERED BY THE MIST ELIMINATOR.  CYCLOHEXYLAMINE MAY BE TESTED IN PLACE OF THE HVDRAZINE.




THE PLANT HAS NOT YET AWARE OF THE CAUSE OF THE CORROSION, ALTHOUGH THEY SUSPECTED CARBON, SULFUR,




AND NITROGEN ACID GASES.  CHLORIDES HAVE VIRTUALLY BEEN RULED OUT AS THE SOURCE OF THE CORROSION.








2ND OUARTER-1978    THE FMC FGD SYSTEM CONTINUED TO OPERATE ON A CONTINUOUS BASIS, BEING RESPONSI-




BLE FOR NO DOWNTIME.  ANY MAINTENANCE OPERATIONS MERE EFFECTED WHILE THE SYSTEM MAS OPERATING.




IT IS IMPORTANT TO NOTE AGAIN THAT THE SYSTEM IS DESIGNED WITH 100X REDUNDANCY.








3RD OUARTER-1978    THE SYSTEM CONTINUED TO DEMONSTRATE 100X AVAILABILITY DURING THIS PERIOD.




CYCLOHEXYLAMINE IS NOW BEING USED INSTEAD OF HYDRAZINE TO CONTROL PH DOWNSTREAM OF THE ABSORBER.  PH




IS NOW IN THE 6-7 RANGE AND CORROSION SEEMS TO HAVE STOPPED.  IF FURTHER CONTROL OF PH IS NEEDED,




ADDITIONAL CYCLOHEXYLAMINE SPRAY POINTS MAY BE INSTALLED.






4TH gUARTER-1978     SYSTEM AVAILABILITY FOR THIS PERIOD CONTINUED TO BE 100*.  CYCLOHEXYLAMINE MILL




CONTINUE TO BE SPRAYED INTO THE FLUE GAS EXITING THE SCRUBBER.  THIS RAISES THE PH OF THE ENTRAINED




LIQUID AND HAS STOPPED THE ACID CORROSION IN THE CARBON STEEL OIL STORAGE TANKS.  PRIOR TO THE




ADDITION OF THE AMINE SPRAYS, THE TANKS WERE CORRODING AT A RATE OF ABOUT 40 MILS PER YEAR.








1ST QUARTER-1979    SCRUBBER OPERATIONS CONTINUED TO BE PROBLEM-FREE DURING THE PERIOD.  PLANS ARE




BEING MADE TO TEST MORE VOLATILE AMINE CHEMICALS IN PLACE OF THE CYCLOHEXYLAMINE.  THE PRESENT




POINT OF INJECTION IS JUST DOWNSTREAM OF THE KNOCKOUT DRUM.

-------
                                                                              STATUS  TO  APRIL   1979
                                       SECTION   9  (CONTINUED)
              PERFORMANCE DESCRIPTION  FOR  OPERATIONAL  FGD  SYSTEMS  ON  INDUSTRIAL  BOILERS
   INSTALLATION NAME
   INSTALLATION LOCATION
   SOURCE  CHARACTERISTICS
   SOURCE  RATING

   NUMBER  Of  SEPARATE FGl)  UNITS
   NUMbER  OF  BOILERS BEING CONTROLLED
   SOURCE  CAPACITY
   CONTROL  SYSTEM VENDOR
   CONTROL  PROCESS
   NEM  /  RETROFIT
   START-UP DATE
   CONTROL  SYSTEM STATUS
   802  REMOVAL  EFFICIENCY
   WATER  MAKE-UP
   CONTROL  SYSTEM COST
BELRlOGt OIL CO.
MCKITTHICK, CALIFORNIA
CSUDt OIL (l.lk SULFUR)
U,000 SCFM
24,000 ACFM a 570 F
 1
 1
6 MN (EQUIVALENT)
SO MM BTU/HR
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM • 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLO* RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
C-E NATCO
SODIUM HYDROXIDE SCRUBBING
NEN
JANUARY, 1979
OPERATIONAL
90S (500 PPM 302 d INLET)
IS GPM
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION
      BELRIUGE  OIL  COMPANY  HAS  AN  ENHANCED OIL KECOVERY  SITE  IN MCKITTRICK,  CALIFORNIA.   THE SITE  IS
LOCATED  IN  WESTERN KERN" COUNTY 'AND HAS SEVERAL SMALL  STEAM GENERATORS  RATED AT  30  AND 2S MM BTU/HR.
THE  CRUDE OIL  HAS  1.1  PERCENT  SULFUR CONTENT.
,      IN  VIE* UF  THE NEN  REGULATIONS OF THE CALIFORNIA AIR RESOURCE BOARD  (CARS), BELRIDGE HAS  UNDER-
TAKEN A  PROGRAM  TO EVALUATE THi COMMERCIALLY AVAILABLE  FGD TECHNOLOGY  FOR APPLICATIONS  TO A SMALL
(TYPICALLY  50  MM BTU/HR) STEAM GENERATOR.  THEY HAVE  ALREADY  INSTALLED TfcO  FGD  SYSTEMS  SUPPLIED BY
HEATER TECHNOLOGY  AND  THERMOTICS.  (SEE  SECTION 9  OF  THIS REPORT FOR DESCRIPTIONS  OF THESE SYSTEMS).
A THIRD  SYSTEM,  BEING  SUPPLIED BY C-E NATCO, IS UNDER CONSTRUCTION.  C-E  NATCO, A  SUBSIDIARY OP
COMBUSTION  ENGINEERING,  IS THE PRINCIPAL SUPPLIER  OF  THE STEAM GENERATORS TO THE OIL FIELDS.   THE
FGD  SYSTEM  IS  SCHEDULED  TO 60  ONSTREAM BY EARLY JANUARY 1979.
      THE FLUE  GAS  (29,000  ACFM AT 570 F) is UUENCHED  BY A SET or SPRAYS IN  THE  BOTTOM PART OF  THE
ABSORBER (7 FEET DIA X 35  FEET HIGH).  THE QUENCHER SECTION  HAS A SEPARATE  RECIRCULATION PUMP
(300  GPM) WHICH  ALSO BLEEDS OFF A PURGE  STREAM (10 GPM).  THE PH IN THIS  STAGE  IS  RANGES FROM  t-6.5.
THE  COOLED  GAS PASSES  THROUGH  A "CHIMNEY-TRAY* (TRAY  HITH A  CENTRAL DONNCOMER)  AND IS FURTHER  CON-
TACTED MITH LIQUOR  SPRAYS  (PH  BETWEEN 7.5-6.0).  THE  ABSORPTION, STAGE  HAS A SEPARATE
RECIRCULATION  PUMP  (300  GPM) NHICH ALSO  RECEIVES A CONTINUOUS STREAM OF FRESH SODIUM HYDROXIDE
SOLUTION (0.15 GPM).   THE  FLUE GAS PASSES THROUGH  A CHEVRON  MIST ELIMINATOR AND A  STUB  STACK AT THE

-------
                                                                             STATUS TO APRIL  1979




                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL F6D SYSTEMS ON INDUSTRIAL BOILERS




BELRIDGE OIL CO.l MCKITTRICK, CALIFORNIA (CONTINUED)






TOP OF THE ABSORBER.




     THE ABSORBER, TRAY, RECIRCULATION PUMPS, PIPING, AND STACK ARE MADE OF 316L SS.  THE




CAUSTIC ASH MIX TANK, FEED PUMP AND PIPING ARE CARBON STEEL, AND THE MIST ELIMINATOR IS FRP.








                                          OPERATING HISTORY



4TH OUARTER-1978    THE SYSTEM IS UNDER CONSTRUCTION AND THE STARTUP DATE IS DELAYED TO EARLY




JANUARY 1979 FROM NOVEMBER 1970.








1ST OUARTER-1979    THE SYSTEM WAS FIRST STARTED UP IN FEBRUARY.  HOWEVER, IT DID NOT ACHIEVE THE




REOUIftEO SOd REMOVAL (90S).  THE PRIMARY REASONS OF THE LOWER REMOVAL (85*) WERE THE INEFFICIENT




SPRAY NOZZLE DESIGN, HIGH BLONOOwN RATE AND LOW MAKEUP OF FRESH CAUSTIC.  THE SECOND TESTING




PERFORMED ON MARCH 15,  APPEARS TO HAVE ACHIEVED HIGH 308 REMOVAL O95X).  THERE HERE NO STARTUP




PROBLEMS AND THE SYSTEM IS OPERATIONAL.

-------
                                                                             STATUS  TO APRIL  1979

                                       SECTION  9  (CONTINUED)

             PERFORMANCE  DESCRIPTION FUN OPERATIONAL F6D  SYSTEMS UN  INDUSTRIAL BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATIN6



  NUMBER OF SEPARATE F6D UNITS

  NUMBER OF BOILERS BEING CONTHOLLEU

  SOURCE CAPACITY
  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW / RETROFIT

  START-UP MATE

  CONTROL SYSTEM STATUS

  802 REMOVAL EFFICIENCY

  MATER MAKE-UP

  8LUD6E OR BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
BELM106E OIL CO.

MCKITTRICK, CALIFORNIA

OIL II.IX SULFUR)

12,000 SCFM (1 BOILER)

£4,000 ACFM a 570 F

 i

 t

b MH (EQUIVALENT)

50 MH BTU/HR

(FOR THIS REPORT* UNLESS STATED OTHERWISE, 2000 SCFM • 1 EQUIVALENT MN.
THIS IS BECAUSE GAS FLON RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

HEATER TECHNOLOGY

SODIUM HYDROXIDE SCRUBBING

NEW

JUNt,  1978

OPERATIONAL

90S (SOU PPM SU2 AT INLET)

IS 6PM

WA8TENATER TREATMENT

SEE SECTION IS FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

     BELRIDGE OIL COMPANY HAS AN ENHANCED OIL RECOVERY SITE IN MCKITTRICK, CALIFORNIA.  THERE ARE

SEVERAL SMALL STEAM GENERATORS* EACH RATED AT 50 MM BTU/HR, WHICH BURN A PART OF THE OIL PRODUCED

BY THE RECOVERY OPERATIONS.  THE CRUDE OIL HAS t.t PERCENT SULFUR.

     THE FGU SYSTEM, WHICH HAS SUPPLIED NEW BY HEATER TECHNOLOGY IN JULY 1976* TREATS A FLUE GAS

FLON OF 24,000 ACFM AT S70 F.  THE SYSTEM CONSISTS OF AN EDUCTOR-TYPE VENTURI MOUNTED ON ONE SIDE  •

OF A RECYCLE TANK* AND A STUB STACK MOUNTED ON THE OTHER,  THE VENTURI HAS AN ADJUSTABLE DISK* WHICH

FORMS THE CONTACT STAGE FOR  THE GAS AND RECIRCULATING LIQUOR.  THE GAS THEN FLOWS THROUGH THE MIST

ELIMINATOR HOUSED INSIDE THE STUB STACK.  THE LIQUOR* DISENGAGED FROM THE GAS* IS RECIRCULATEO WITH

A CONSTANT BLEED-OFF OF 4 GPM.  THE DESIGN L/G RATIO IS 40 GAL/1000 ACF.  THE PROCESS USED IS

SODIUM HYDROXIDE SCRUBBING AND FRESH CAUSTIC MAKEUP IS ADDED TO THE RECYCLE TANK.  THE VENTURI

SECTION* CONTACTING DISC* RECIRCULATING PIPING AND THE RECIRCULATING PUMP ARE MADE OF J16L 88.  THE

RECYCLE. TANK IS CARBON STEEL WITH EPOXY TAR COATING AND THE MIST ELIMINATOR IS FRP.  THE PRESSURE

DROP ACROSS THE ENTIRE SYSTEM IS LESS THAN THE VACUUM CREATED BY THE EDUCTOR* ABOUT 1 IN. W.G.

     THE BLEED-OFF STREAM IS TAKEN TO WASTEWATER TREATMENT.  IN ADDITION, IT IS NECESSARY TO BLOW

DOMN FROM THE RECYCLE TANK INTERMITTENTLY.

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS



BELRIDCE OIL CO.l MCKITTRICKr CALIFORNIA (CONTINUED)





                                          OPERATING HISTORY



3RD OUARTER-1978    SINCE F60 SYSTEM START-UP ON JULY 6, 1978 THE SCRUBBER HAS EXPERIENCED



APPROXIMATELY 1 1/Z WEEKS OF DOWNTIME.  MAJOR PROBLEMS HAVE BEEN FAULTY RELAYS IN THE INSTRUMEN-



TATION*  AND PUMP FAILURE.  THE RECIRCULATION PUMP WAS REPLACED.








4TH OUARTER-1976    THE SCRUBBER OPERATED 95 DAYS OUT OF 105 DAYS OF GENERATOR OPERATIONS.  THIS



CORRESPONDS TO AN AVAILABILITY OF 69 PERCENT.  SEVERE VIBRATIONS IN THE RECIRCULATION PUMP CAUSED



FAILURE  OF THE RECYCLE PIPING.  THE PUMP FOUNDATION WAS REINFORCED AND THE PIPING WAS REPLACED.



LEAKS IN CAUSTIC LINES MERE ALSO A PROBLEM AREA.







1ST QUARTER-1979    THE SCRUBBER OPERATED ABOUT 75 DAYS OUT OF A TOTAL OF 90 DAYS.  THIS CORRESPONDS



TO A RELIABILITY VALUE OF 84X.  THE CONDENSATION OF MOISTURE FROM THE EXIT FLUE GAS NAS AN AREA OF



CONCERN.  WHILE WELDIN6 AN EXTENSION TO THE STACK* A SPARK CAUSED A FIRE WHICH DAMAGED THE FRP



MIST ELIMINATOR AND THE EPOXV LINING OF THE ABSORBER*  THE EXTENT OF DAMAGE AND REPAIRS REQUIRED



IS UNDER INVESTIGATION.

-------
                                                                             STATUS TO APRIL  1979

                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOKjOPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING

  NUMBER OF SEPARATE FGD UNITS
  NUMBER OF BUILERS BEING CONTROLLED
  SOURCE CAPACITY
  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEM / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  302 REMOVAL EFFICIENCY
  MATER MAKE-UP
  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
BELR10GE OIL CO.
MCKI1THICK, CALIFORNIA
CRUDE OIL  It.IX SULFUR)
12,000 SCFM
24,000 ACFM a 570 F
 1
 1
5000 LB/HR STEAM
6 MM (EQUIVALENT)
SO MN BTU/HH; 50,000 LB/HR STEAM
(FOR THIS REPORT, UNLE5S STATED OTHERWISE, 2000 SCFM a 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLOW RATE  IS  THE PRIMARY FACTOR IN MODULE SIZING.)
THERMOTICS INC.
SODIUM HYDROXIDE SCRUBBING
NEN
JULY, 1978
OPERATIONAL
9oz (500 PPM S02 a INLET)
15 GPM
^ASTEHATER TREATMENT
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
     BELRIDGE OIL COMPANY HAS AN ENHANCED OIL RECOVERY SITE IN MCKITTRICK, CALIFORNIA.  THERE ARE
SEVERAL SMALL STEAM GENERATORS, EACH RATED AT 50 MM BTU/HR, NHICH BURN A PART OF THE OIL PRODUCED
BY THE RECOVERY OPERATIONS.  THE CRUDE OIL HAS 1.1 PERCENT SULFUR.
     THE FGD SYSTEM, WHICH HAS SUPPLIED NEK BY THERMOTICS INC. IN JULY 1978, TREATS A FLUE GAS
                                                                        i
FLOW OF 24,000 ACFM AT 570 F.  THE SYSTEM CONSISTS OF AN INLET OUCT HHICH HOUSES A NOZZLE DELIVERING
FRESH HATER AT HIGH PRESSURE (SO PSIA).  THE "JET-NOZZLE" CREATES ENOUGH VACUUM (1-2 IN MG)| TO OFF-
SET THE SYSTEM PRESSURE DROP.  'THE GAS AND EXCESS HATER IMPINGE THE CENTRAL DOWNCOMER FROM THE
                                                                        !   i             :   '
ABSORPTION STA6E.  THE GAS RISES UP THROUGH THE DOWNCOMER AND IS CONTACTED KITH 2 OR 3 LAYERS OF
RECIRCULATION LIQUOR SPRAYS (PH=6.5).  THE DESIGN L/G RATIO IS 30 GAL/1000 ACF IN THE ABSORBER.
THE OVERFLOM LIQUOR FROM THE ABSORPTION STAGES AND THE EXCESS FRESH WATER ARE TAKEN TO HASTE
DISPOSAL (4 GPM).  A PART OF THE MAKEUP MATER IS ADDED TO THE RECIRCULATION TANK.  THE TOTAL
MAKEUP HATER FLON IS ABOUT 15 GPM.
    THE ENTIRE FGO SYSTEM IS MADE OF 316L SS, EXCEPT FOR THE CAUSTIC STORAGE TANK, FEED PUMP AND
THE FEED LINES, HHICH ARE CARBON STEEL.
                                                3«

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS
BELRIDGE OIL CO.T MCKITTRICK, CALIFORNIA (CONTINUED)

                                          OPERATING HISTORY
3RD 8UARTER-1978   SINCE FGD SYSTEM START-UP ON JULY 61 1978 THE SCRUBBER HAS EXPERIENCED
APPROXIMATELY 1 I/a NEEK3 OP DOWNTIME.  MAJOR PROBLEMS HAVE BEEN FAULTY RELAYS IN THE INSTRUMENTA-
TION, AND PUMP FAILURE.  THE RECIRCULATION PUMP NAB REPLACED.

4TH QUARTER-1978   THE SCRUBBER OPERATED 96 DAYS OUT OF 105 DAYS OF GENERATOR OPERATIONS.  THIS
CORRESPONDS TO AN AVAILABILITY OF 93 PERCENT.  ELECTRICAL CONNECTION MALFUNCTIONS AND LEAKS IN
CAUSTIC FEED LINE NERE THE MAJOR PROBLEMS.  THE RECIRCULATION PUMP SEAL REQUIRED REPLACEMENT.

1ST QUARTER-1979    THE FGD SYSTEM HAS DONN FOR THE ENTIRE PERIOD DUE TO MAJOR LEAKS IN ONE NELO
LINE AROUND THE CIRCUMFERENCE OF THE ABSORBER.  APPARENTLY, THE MELDING MAS PERFORMED ONLY ON THE
EXTERNAL SIDE.  THIS LED TO SEVERE STRESS CORROSION CRACKING AND PITTING ON THE INSIDE TO THE
EXTENT OF CAUSING SERIOUS LEAKS.  THE ABSORBER NAS DISMANTLED FROM THE FOUNDATION, THE MELDING HAS
REPAIRED AND THE ABSORBER MAS ERECTED AGAIN BY MID-MARCH.  THE SYSTEM IS SCHEDULED TO STARTUP
BY THE END OF THE QUARTER.
                                                 39

-------
                                                                             STATUS TO APRIL  1979

                                      SECTION  9 (CONTINUED)

             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS



  SOURCE RATING

  NUMBER OF SEPARATE F6D UNITS

  NUMBER OF 8UILERS BEING CONTROLLED

  SOURCE CAPACITY





  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  MEN / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  S02 REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  MATER MAKE-UP



  SLUOSE OR BY-PROOUCT DISPOSAL



  CONTROL SYSTEM COST
CANTON TEXTILES

CANTON, GEORGIA

COAL (O.BX SULFUR)

INTERRUPTIBLE NATURAL GAS

25,000 SCFM (1 BOILER)

 1

 1

13 Mh (EQUIVALENT)

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLUN RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

FHC ENVIRONMENTAL EQUIPMENT

CAUSTIC HASTE STREAM

RETROFIT

JUNE, 1974

OPERATIONAL

70S (500 PPM H INLET)

801 - 90S (5.92 LB/MM BTU AT INLET)

OPEN LOOP

CLOSED LOOP; 0.5 6PM

NON-FIXATED SLURRY TO LINED POND

NA S03/S04 LIQUOR DISPOSED TO LINED HOLDING PONDS

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

   CANTON TEXTILE MILLS IN CANTON, GEORGIA HAS A 13 MM (EQUIVALENT) STEAM BOILER WHICH FIRES COAL

FROM OCTOBER TO MAY AND INTERRUPTIBLE NATURAL GAS THE REMAINDER OF THE YEAR.  THE BOILER IS A COM-

BUSTION ENGINEERING (C-E) VERTICAL UNIT EQUIPPED MITH A CYCLONIC DUST COLLECTOR,  TH| DUST COLLECTOR

CAPTURES APPROXIMATELY 75 TO 100 POUNDS OF FLY ASH PER HOUR.  THE TYPICAL COAL BURNED HAS A SULFER

CONTENT OF 0.8 PERCENT AND AN AS-RECEIVED HEAT VALUE OF 13,600 BTU PER POUND OF COALJ SULFER DIOXIDE

CONCENTRATION IN THE FLUE GAS IS 500 PPM HITH * PARTICULATE LOADING OF 5.92 LB/MM BTU.

    THE FED SYSTEM, DESIGNED BY R.5. NOONAN, INC., CONSISTS OF AN FMC MEDIUM ENERGY* jVENTURI-TYPE

SCRUBBER MADE OF 316L SS AND A SEPARATOR (8 FT OIA X 12 FT HIGH) OF FRP.  THE FLUE C/iS ENTERS THE

VENTURI (PRESSURE DROP-6 TO 12 IN N.G.) AT A RATE OF 42,000 ACFM « 430 F THROUGH A 3d HP. BUFFALO

FORCE FD FAN.  THE DUCTING LEADING TO AND FROM THE SCRUBBER IS MADE OF 1/4 IN. 316L SS, AND FRP

RESPECTIVELY.  THE FLUE GAS LEAVES THE SYSTEM THROUGH AN FRP STACK.  DYEING WASTE WATER CONTAINING

SODIUM SULFATE NITH A PH OF APPROXIMATELY 10.5 TO IZ IS THE SCRUBBING LIQUOR.  THE SCRUBBING LIQUOR

IS INJECTED INTO THE FLUE 6AS STREAM THROUGH 1 IN. DIA. 316L SS SPRAY NOZZELS AHEAD OF THE VENTURI

THROAT.  THE NASTENATER IS COLLECTED IN AN EQUALIZATION BASIN.  DEPENDING ON THE OESIREO DEGREE OF
                                                40

-------
                                                                             STATUS TO APRIL  1979




                                      SECTION  9 (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS



CANTON TEXTILES; CANTON* GEORGIA (CONTINUED)






NEUTRALIZATION, THE WASTEHATER IS THEN RECYCLED TO THE SCRUBBER OR PUMPED TO THE WASTEWATER TREAT-




MENT FACILITY.  A PH LEVEL OF 8.0 IS OBTAINED IN THE FRP RECIRCULATION TANK.  THE ALLIS CHALMERS RE*




CIRCULATION PUMP IS MADE OF RUBBER LINED CAST IRON WHILE DYE RETENTION TANK IS OF CONCRETE.




                                        OPERATING HISTORY



    SEVERAL OPERATIONAL PROBLEMS HERE ENCOUNTERED UPON INITIAL STARTUP.  A SEVERE PLUGGING PROBLEM



MAS ENCOUNTERED IN SEVERAL PUMPS DUE TO THE PRESENCE OF COTTON FIBERS IN THE WASTEWATER.  A SCREEN




BASKET AROUND THE INITIAL SCRUBBER SYSTEM INTAKE PIPE IN THE DYE COLLECTION MANHOLE HAS BEING USED




TEMPORARILY UNTIL FURTHER INVESTIGATION IS COMPLETED.  SURFACE-ACTIVE AGENTS IN THE DYEING HASTE-




HATERS HHICH PRODUCE FOAMING IN THE SCRUBBER PUMP HERE DETECTED AND A DEFOAMER ADDITIVE IS NOH




INJECTED INTO THE SCRUBBER FEED FROM THE DYE RETENTION BASIN.  FOULING OF THE PH PROBES AND MIST




CARRYOVER ARE OTHER PROBLEM AREAS THAT HAVE BEEN INVESTIGATED.




     REFER TO FIGURE 14-3 IN SECTION 14 FOR A DETAILED PROCESS FLOH DIAGRAM OF THIS SYSTEM.




3RD OUARTER-1977    NO OPERATIONAL PROBLEMS HERE REPORTED DURING THIS SURVEY PERIOD.  THE PLANT



REPORTED THE SYSTEM HAS WORKING SATISFACTORILY.  THE PLANT HAS BURNING NATURAL GAS BUT EXPECTED




TO RETURN TO COAL DURING THE HEATING SEASON (DECEMBER-MAY).






4TH OUARTER-1977    THE PLANT STARTED BURNING COAL AND OPERATING THE SCRUBBER 100 PERCENT OF THE




TIME IN MID-OCTOBER.  NO OPERATIONAL PROBLEMS HERE ENCOUNTERED DURING THIS PERIOD.






1ST OUARTER-1978    THE SCRUBBER DEMONSTRATED AN OPERABILITY OF 100X.






2ND OUARTER-1978    THE SCRUBBER HAS SHUTDOWN IN MID-MAY NHEN GAS FIRING RESUMED FOR SUMMER.  COAL-




FIRING MILL RESUME IN MID-OCTOBER.  DURING COAL-FIRED OPERATIONS IN 1977 AND 1978, THE SCRUBBER RAN




AT A 100X OPERABILITY.








3RD OUARTER-1978    NO UPDATE INFORMATION WAS AVAILABLE FOR THIS REPORT PERIOD.








4TH OUARTER-1978    COAL FIRING RESUMED IN MID-OCTOBER. AND WOULD CONTINUE FOR THE REST OF WINTER




MONTHS.  DURING THIS SURVEY PERIOD (6 DAYS PER WEEK), THE SCRUBBERS OPERATED AT 99Z RELIABILITY.




THE DOHNTIME OF 10 HOURS HAS CAUSED BY BUILD-UP OF ABRASIVE FLVASH IN THE SCRUBBER,  THE INTERIOR OF




THE SCRUBBER WAS THEN CLEANED.  THE 316L S3 DUCTWORK ENTERING THE SCRUBBER HAS AFFECTED BY FLVASH




EROSION AND HILL BE REPLACED WITHIN A YEAR.  NO OTHER OPERATING PROBLEMS MERE REPORTED.








1ST OUARTER-1979   THE FGD SYSTEM OPERATED TROUBLE-FREE UNTIL THE BEGINNING OF MARCH WHEN THE FAN




MOTOR BURNED OUT.  THE MOTOR WAS REWIRED AND RETURNED TO SERVICE.  TOTAL DOHNTIME WAS ABOUT ONE




MEEK.
                                                41

-------
                                                                             STATUS TU APRIL  1979
                                      SECTION  9  (CONTINUED)
             PERFORMANCE  DESCRIPTION FOR UPEhAl1UNAL FGO SYSTEMS ON INDUSTRIAL BOILERS
  IN8TALLATIUN NAME
  INSTALLATION LOCATION
  BOUNCE CHARACUHISTICS
  SOURCE RA1IN&

  NUMbER OF SEPARATE FGD UNI IS
  NUMBER OF BUlLtKb bfcING CONTHOLLtU
  SOURCE CAPACITY


  CONTNUL  SYSTEM VENOClM
  CONTROL  PROCESS
  MEN / ftETHllFIT
  START-UP OA1E
  CONTHUL  SYSTEM STATUS
  302 REMOVAL EFFICIENCY
  SLUDGE OR BY-PRODUCT DISPOSAL

  CONTROL  SYSTEM COST
CATERPILLAR TRACTOR CO.
EAST PfiURIA, ILLINOIS
COAL 14.2* SULFUR)
21(1,000 SCFM (TOTAL - 4 BOILEHS)
80,000 ACFM a 35U F, FOR EACH OF 4 FGD SYSTEMS
 4
 4
105 MM (EQUIVALENT)| TOTAL - 4 BOILERS
(FOK THIS REPORT, UNLESS STATED OTHERWISE* 4000 SCFM » I EQUIVALENT MN.
THIS IS BECAUSE GAS FLO* RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
FMC ENVIRONMENTAL EQUIPMENT
OOOBLE ALKALI (CONCENTRATED)
2 NEfc, 2 RETHO
APRIL, 197«
OPERATIONAL
90S (2,000 PPM »• INLET)
DEMATEREO SLURRY TO LANDFILL
60** SOLIDS (CAS04) SLUDGE DIRECTLY TO LANDFILL
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
    THE CATERPILLAR TKACTOR COMPANY PLANT LOCATED IN EAST PEURIA, ILLINOIS HAS FOUR COAL-FIRED
BOILERS. TWO OF THE BOILERS ARE RATED AT 200,000 POUNDS OF STEAM PER HOUR AND THE REMAINING ThO ARE
HATED AT 210, OVO POUNDS OF STEAM PEH HOUR.  THE COAL BURNEO IS ILLINOIS COAL WITH A HEATING VALUE
OF iOibOO ttTU/LB ANU AN AVERAGE SULFUR CONTENT OF 3.2*.  THE TOTAL BOILER CAPACITY IS ABOUT 100 MN
(EUUIVALEM).  MECHANICAL COLLECTORS ARb USED FOK PRIMARY PARTICULATE CONTROL.  GASES EXHAUST
THROUGH A LINED STACK WHICH IS APPROXIMATELY 175 FT TO ISO FT HIGH.  THE STACK CONSISTS OF TWO
KIDNEY SHAPED FLUES EMBODIED NITHIN ONE OUTER SHELL.
    THE AIR QUALITY CONTROL SYSTEMS HAVE BEEN SUPPLIED BY FMC ENVIRONMENTAL EQUIPMENT, DIVISION.
THERE IS ONE SCHUHBER TRAIN FOR EACH OF 1HE FOUR BOILERS, tfHICH CONTROLS BOTH PARTICULATE AND 802
EMISSIONS FROM ABOUT 80*000 ACFM • 390 F.  THE FOUR FGD SYSTEMS SHARE COMMON REGENEKATION
FACILITIES, VACUUM FILTERS, AND SLUDGE DISPOSAL.
     REFER TU FIGURE 14-5 IN SECTION 14' FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.

                                         OPERATING HISTUKY
4TM OUARTEH-1977    START-UP MAS SCHEDULED FOK MARCH 1978 AND CONSTRUCTION ,t»AS PROGRESSING SMOOTHLY.
1ST (IUARTER-1978    CONSTRUCTION OF THE FOUR FGU SYSTEMS HAS COMPLETED.  START-UP HAS DELAYED DUE

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOH OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS
CATERPILLAR TRACTOR CO.} EAST PEORIA, ILLINOIS (CONTINUED)
TO THE COAL SHORTAGE.

2ND UUARTER-1976    DURING THIS REPORT PERIOD START-UP OCCURRED,  BECAUSE THE BOILER PLANT MAS NEAR
THE END OF  THE HEATING SEASON, THE BOILER LOADS MERE IN THE 70,000-100,000 LB/HR STEAM RANGE.
DURING COLD HEATHER OPERATIONS, THE BOILEN LOADS, ARE APPROXIMATELY 800,000 LB/HR.  THE SYSTEM MAS
BUILDING GOOD FILTER CAKE DURING THE START-UP PHASE OF OPERATIONS.  FINAL STEADY STATE OPERATIONS
MERE NOT ACHIEVED BEFORE SUMMER SHUTDOWN.

3RD QUARTER-197S    THE FGD SYSTEM HAD JUST STARTED UP AGAIN AFTER SUMMER SHUTDOWN.
NO MAJOR START-UP PROBLEMS MERE REPORTED.

4TH QUARTER-1978    PLANT PERSONNEL REPORT THAT AN ABNORMALLY HIGH PRESSURE DROP THROUGH THE
SCRUBBERS IS RESTRICTING THE BOILERS TO ABOUT 60S OF THEIR CAPACITY.  FAN AND DRAFT TESTS MERE
BEING RUN IN DECEMBER TO PINPOINT THE PROBLEM AREA.  THE FAN AND DRAFT TESTS FURTHER DELAYED
SCHEDULED EMISSION TESTING.  SINCE START-UP IN SEPTEMBER SCRUBBER OPERATIONS HAVE NOT BEEN SUFFICI-
ENTLY CONSISTENT TO COMPLETE ANY EMISSION TESTS.
    A TEN-INCH PLASTIC RECIRCULATION LINE BROKE ON ONE SCRUBBER ANO\HAD TO BE REPLACED.

1ST QUARTER-1979    DURING THE REPORT PERIOD. THREE BOILERS ALONG WITH THE F6D SYSTEMS OPERATED
IN JANUARY.  NO MAJOR OPERATING PROBLEMS WERE REPORTED EXCEPT CORROSION IN 802 MONITORS.  THE
RELIABILITY VALUES OF THE FGO SYSTEMS ABOUT 90S.  THE FGD SYSTEMS HERE SHUTDOWN FROM FEBRUARY 5
UNTIL MARCH 19 DUE TO UNAVAILABILITY OF SODA ASH.

-------
                                                                             STATUS TU APRIL  1979

                                      SECTION  9  (CONTINUED)

             PERFORMANCE  DESCRIPTION FUN OPERATIONAL FGD SYSTEMS UN  INDUSTRIAL BOILERS



  INSTALLATION NAME                       CATERPILLAR TRACTUK CO.

  INSTALLATION LOCATION                   JULIET, ILLINOIS

  SOURCE CHARACTERISTICS                  COAL (3.2X 3ULFUK)

  SOURCE. RATING                           67,ObO SCFM (101AL - 2 BOILERS)

  NUMBER OF SEPARATE F6D  UNI1S             Z

  NUMBER UF BOILERS BEING CONTROLLED       2

  SOUKCE CAPACITY                         54 M* (EQUIVALENT); TOTAL - 2 BOILERS

                                          (FOR THIS REPORT, UNLESS STATED OTHERWISE, 20UO SCFM • 1 EQUIVALENT MM,
                                          THIS IS BECAUSE GAS FLOW MATE IS THE PRIMARY FACTOR IN MODULE SUING*)

  CONTROL SYSTEM VENOUM                   ZURN INDUSTRIES

  CONTkUL PROCESS                         DOUBLE ALKALI (DILUTE)

  NEw / RETROFIT                          RETROFIT

  START-UP DATE                           SEPTEMBER* 1974

  CONTROL SYSTEM STATUS                   OPERATIONAL

  802 KtMUVAL EFFICIENCY                  9W»X (3000 PPM ti INLET)

  MATER MAKE-UP                           CLOSED LOOP» O.S GPM

  SLUoSfc OK ttY-PKOOUCl DISPOSAL           DEHATERED SLURRY TU LANDFILL

  CONTROL SYSTEM COST                     SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION



                                       BACKGROUND INFORMATION

    ThE JOLIET PLANT OPERATES TrtO COAL-FIRED BOILERS RATED AT 100,000 AND 00,000 POUNDS OF STEAM

PER HOUR.  THESE BOILERS  ARE ON-LINE ONLV DURING WINTER MONTHS, ONE UF WHICH OPERATES 24 HR/DAY

AND THE OTHER ONLY MHEN A GREATER STEAM RATE IS REQUIRED DUE TO COLO WEATHER.  THE COAL HAS A

HEATING VALUE OF lOrbOO BTU/LB AND IS FIRfcD Al A RATE OF 9.65 TONS/HH.  TOTAL 302 EMISSIONS FROM

THE BOLER IS 6.7« LBS/MM  BTU.

    THE F6D SYSTEM UN tACH BOILER IS A ZURN DOUBLE ALKALI SCRUBBER CONSTRUCTED OF 316L STAIN-

LESS STEEL.  EACH SCRUBBER EXHAUSTS THROUGH A CARBON STEEL STACK.  THE TOTAL FLUE GAS FLOW RATE

IS 103,500 ACFM 8 SbU F.  THE SCRUBBER UNITS ARE PRECEDED BY MECHANICAL COLLECTORS FOR PARTICULATE

REMOVAL.  THE ZURN SCRUBBER UTILIZES A DUSTRAX10R MODULE FUR BOTH PARTICULATE AND 302 CONTROL.

    SPENT SCRUBBING LIUUOR IS PUMPED TO THE REGENERATION AREA WHERE LIME IS ADDED TO PRODUCE CALCIUM

3ULFITE/SULFAT6 IN CLAHIFIERS.  CLARIFIER UNDERFLOW, WHICH IS 1S-2UX SOLIDS BY WEIGHT* IS

DEWATEREO BY VACUUM FILTERS TO APPROXIMATELY 6SX SOLIDS BY WEIGHT.  THE THIXOTRUPIC SLUDGE

PRODUCED IS READY FOR DISPOSAL AT A LANDFILL.  CLARIFIER OVERFLOW IS RETURNED TO THE SCRUBBER AS

REGENERATED SCRUBBING LIOUOK.  SODA ASH IS ALSO ADDED TO THE REGENERATED LIQUOR TO REPLENISH

SODIUM LOST IN THE SLUDGE.  LIME ANU SUDA ASH ARE STORED IN OUTSIDE SILOS AND PNEUMATICALLY CONVEYED

TO USE POINTS.  * CHEMICAL TREATMENT BUILDING WAS ERECTED TO HOUSE REGENERATION AND SLUDGE HANDLING

EQUIPMENT.

    REFER TO FIGURE 14-6 OF SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.


                                                44

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION  9  (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL F60 SYSTEMS ON INDUSTRIAL BOILERS
CATERPILLAR TRACTOR CO.i JOLIET, ILLINOIS  (CONTINUED)


                                         OPERATING HISTORY
3RD QUARTER-1977    PROBLEMS OCCURRED WHEN A TANK RAN DRY AND DAMAGED A PUMP.  SOME PIPE PLUGGING
PROBLEMS ALSO OCCURRED AS A RESULT OF THE PUMP FAILURE.  A MAJOR PROBLEM AREA MAS THE HEAVY
NEAR OF THE FILTER CLOTHS ON THE VACUUM FILTERS.  THE FILTER CLOTH LASTS ONLY 2 TO 3 WEEKS.
NO SOLUTIONS HAD BEEN FOUND BUT FILTER DESIGN MODIFICATIONS MERE BEING CONSIDERED.
THE UNITS HERE ULTRASONICALLY TESTED AND RESULTS  SHOW THAT THE SYSTEMS ARE ON THE HIGH
SIDE OF TOLERANCE LEVELS.  A MINOR LEAK WAS DETECTED AS A RESULT OF A FAULTY WELD.

4TH QUARTER-1977     FGO SYSTEM RESTART OCCURRED  AT THE BEGINNING OF THE HEATING SEASON.
PLANT HAD INITIATED A PROCESS OF DETAILED RECORD  KEEPING BUT WAS STILL WORKING
ON THE INTERNAL INFORMATION TRANSFER PROCESS.  PLANT HAS INDICATED THAT A SUMMARY OF THESE
RECORDS MILL BE AVAILABLE TO THIS REPORT IN THE FUTURE.

1ST OUARTER-197S   FILTER CLOTH PROBLEMS CONTINUED WITH REPLACEMENT BEING REQUIRED EVERY 2-3 WEEKS.
THE SYSTEMS WERE DOWN IN MARCH BECAUSE OF PLUGGED PIPELINES.

2ND OUARTER-1976   UNRELIABLE S02 MONITORS WERE A PROBLEM DURING THIS PERIOD.  HEAVY ATTRITION OF
FILTER CLOTHS CONTINUED*

3RD OUARTER-197B    DUE TO SHORT FILTER FABRIC LIFE AND SLUDGE FREEZE UP PROBLEMS, FILTER DESIGN
MODIFICATIONS WERE STILL BEING CONSIDERED* BUT HAD NOT YET BEEN MADE.
     808 MONITORS ARE STILL A PROBLEM EXHIBITING  PLUGGING, CORK03ION, AND UNRELIABLE PERFORMANCE.
PROBES OF 304 S3, 316L SS AND TEFLON COATING HAVE ALL BEEN TRIED WITHOUT SUCCESS,  HASTELLOY-C
PROBES HAVE BEEN INSTALLED, BUT THE PLANT HAS NOT HAD TIME TU EVALUATE THEIR PERFORMANCE.  REHEAT
EQUIPMENT WAS SCHEDULED TO BE INSTALLED BUT HAS NOT BEEN AS OF THIS UP-DATE.  GUILLOTINE-TYPE
DAMPERS REPLACED THE LOUVER-TYPE ISOLATION DAMPERS ORIGINALLY INSTALLED.  HOWEVER* THE GUILLOTINE-
TYPE CANNOT BE CLOSED TIGHTLY BECAUSE FLY ASH COLLECTS IN THE BOTTOM OF THE GUILLOTINE SHEATH.

4TH OUARTER-1976    THE BOILERS STARTED OPERATIONS IN THE LAST WEEK OF OCTOBER.  FILTER CLOTH WEAR
CONTINUES TO BE A PROBLEM.  THE HASTELLOY-C 802 PROBES HE8UIRE EXCESSIVE MAINTENANCE FOR PROPER
FUNCTIONING.  CORROSION AND EROSION OF THE PROBES IS NOT YET EVIDENT.  FLYASH ACCUMULATION IN THE
BOTTOM OF THE GUILLOTINE DAMPERS IS STILL A PROBLEM.
     ALTHOUGH PIPE PLUGGING is NOT NORMALLY A PROBLEM (THE ENTIRE SYSTEM is FLUSHED AND CLEANED
DURING THE SUMMER OFF SEASON),  SLIGHT BUILDUPS IN THE PIPING HAVE OCCURRED.

1ST QUARTER-1979    DURING THE QUARTER THE FGD SYSTEMS WERE PLAGUED 8Y A SERIES OF PROBLEMS.  DURING

-------
                                                                             STATUS TO APRIL  1979




                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS




CATERPILLAR TRACTOR CO.; JOLIEl, ILLINOIS (CONTINUED)






JANUARY, BOTH F6D SYSTEMS MERE DOWN.  THE PROBLEMS STARTED WITH A FAILURE OF THE THICKENER UNDERFLOW




PUMP ALONG WITH THE SPAKE PUMP.  THE THICKENER RAKES STOPPED TURNING.  THE SLUDGE RETURN LINE COT



PLUGGED AT THE VACUUM FILTER.  THE STORAGE CLARIFIES RAKES FAILED TO TURN AND THE BEARING SUPPORTING



THE RAKES BROKE DOWN DUE 10 A LARGE AMOUNT OF SLUDGE ACCUMULATION.  THE PROCESS FLOW VALVE COULD



NOT BE TURNED IN ANY DIRECTION,  IN ADDITION, DUE TO SEVERE WEATHER CONDITIONS, THE SODA ASH SCREW




FEEDER 6UT FROZEN STUCK.  ALL T06ETHEW THE FGD SYSTEM WAS RESPONSIBLE FOR 717 HOURS OF DONNTIME IN



JANUARY.  DURING FEBRUARY AND EARLY MARCH, THE SYSTEMS OPERATED SPORADICALLY BECAUSE OF A SLUDGE




PUMP MALFUNCTION AND A LACK OF THE REQUIRED AMOUNT OF SODA /ASH.  IN MARCH THE SYSTEMS WERE




OPERATING NORMALLY.

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR dPERAIIONAL FGD SYSTEMS OH INDUSTRIAL BOILERS
  INSTALLATION  NAME
  INSTALLATION  LOCATION
  SOURCE  CHARACTERISTICS
  SOURCE  RATING
  NUMBER  OF  SEPARATE  FGO UNITS
  NUMBER  OF  BOILERS BEING CONTROLLED
  SOURCE  CAPACITY


  CONTROL SYSTEM  VENOOM
  CONTROL PROCESS
  NEW  / RETROFIT
  START-UP DATE
  CONTROL SYSTEM  STATUS
  802  REMOVAL  EFFICIENCY
  SLUD6E  OR  BY-PRODUCT DISPOSAL

  CONTROL SYSTEM  COST
CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS
COAL (3.a* SULFUR)
131,000 SCFH (TOTAL - 3
BO,000 ACFM 4 550 F, FOR EACH OF 2 FGO SYSTEMS
40,000 ACFM o) 150 F, FOR 1 FSO SYSTEM
600,000 LB/HH STEAM (TOTAL - 3 BOILERS)
 3
 3
65 Mft (EQUIVALENT)ij TOTAL - 5 BOILERS
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM • 1 EQUIVALENT MW.
THIS IS BECAUSE GASiFLON RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
FMC ENVIRONMENTAL EQUIPMENT
DOUBLE ALKALI (CONCENTRATED)
NEW
MARCH, 1979
OPERATIONAL
90S (2000 PPM (t INLET)
OEWATERED SLURRY TO LANDFILL
60*1 3ULIDS (CA804) SLUDGE DIRECTLY TO LANDFILL
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
     AT  THE  MAPLEION,  ILLINOIS PLANT, CATERPILLAR IRACTOrt IS INSTALLING FIVE NEH BOILERS, THREE OF
WHICH ARE  SLATED TO BEGIN OPERATIONS DURING JANUARY 1979.  THE OTHER TnO WILL BEGIN OPERATIONS IN
THE EARLY  19BO'S.   BECAUSE CONSTRUCTION HAS NOT YET BEGUN ON THESE TflO FGO SYSTEMS THEY ARE REPORTED
IN SECTION 11  OF THIS  REPORT.  TNO BOILERS STARTING IN JANUARY 1979 ARE RATED AT 250,000 LB/HR STEAM
EACH, THE  OTHER  IS MATED AT 100,000 LB/HR STEAM.  BOTH BOILERS STARTING IN THE EARLY 1980'8 HILL BE
1,100,000  LB/HR.
     CATERPILLAR HAS AnAROED A CONTRACT TO FMC ENVIRONMENTAL EQUIPMENT TO PROVIDE CONCENTRATED MODE
DUAL ALKALI  FGD  SYSTEMS FOR ALL FIVE BOILERS.  EACH BOILER HILL HAVE A SEPARATE FGD SYSTEM.  EACH
SYSTEM HILL  INCLUDE A  VENTURI 3CKUBBEK FOLLOWED BY A CYCLONIC MIST ELIMINATOR.
     FACILITIES  FOR REGENERATION, SLUDGE HANDLING AND DISPOSAL MILL BE SHARED 8* ALL FIVE BOILERS.
THE SAME FACILITIES HAVE BEEN DESIGNED TO HANDLE A TOTAL OF EIGHT BOILERS.  THE ADDITIONAL CAPACITY
FOR THREE  BOILERS HAS  PLANNED FOR PROBABLE PLANT EXPANSION IN THE FUTURE.  THERE IS NO PLANNED
START-UP DATE  FOR THESE THREE BOILERS.
                                                47

-------
                                                                             STATUS TO APRIL  W9



                                      SECTION  9 (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL F6D SYSTEMS UN INDUSTRIAL BOILERS



CATERPILLAR TRACTOR CO.; MAPLETON, ILLINOIS (CONTINUED)






                                         OPERATING HISTORY



3RD QUARTER-1977    SYSTEM HAS UNDER CONSTRUCTION.  START-UP WAS EXPECTED LATE IN THE FALL OF 1977.






4TH OUARTER-1977    CONSTRUCTION DELAYS ON THE STEAM GENERATION SIDE PUSHED PLANT START-UP BACK TO




THE FALL OF 1976.






2ND OUARTER-1978    START-UP MAS STILL PLANNED FOft THE 1976-1979 HEATING SEASON.  THREE BOILERS AND




THEIR INDIVIDUAL FMC FGO SYSTEMS WILL COME ON-LINE AT THAT TIME.








3RD OUARTER-1978     CONSTRUCTION WAS NEAK1NG COMPLETION.  SPECIAL MODIFICATIONS NERE BEING MADE




WHICH WERE DELAYING STAKT-UP.  EXPERIENCE GAINtD AT MOSSVILLE IS BEING APPLIED TO MAPLETON SINCE THE




SYSTEMS ARE SIMILAR.






«TH OUARTER-1978     INSTALLATION OF SPECIAL MODIFICATIONS HAS EXTENDED THE START-UP DATE FOR THE




THREE BOILERS AND THEIR RELATED FGD SYSTEMS.  CONSTRUCTION OF THESE THREE BOILERS



HAS BEEN COMPLETED; START-UP is EXPECTED AT THE. END OF DECEMBER ox BEGINNING OF JANUARY.  INSTALLA-



TION HAS JUST BEGUN ON THE OTHER TwO £50,000 Lb/HR BOILERS.  STAKT-UP FUR THESE TWO BOILERS WILL BE




IN THE EARLY 1980'S.








1ST OUARTER-1979    THE START-UP OPERATIONS FOR THE TWO BOILERS AND THEIR RELATED FGD SYSTEMS BEGAN




ON MARCH 39.  CONSTRUCTION OF ANOTHER LARGE BOILER ALONG WITH FGD SYSTEM IS OVER BUT THE BOILER




MILL NOT BE OPERATED THIS YEAR.  DURING EARLY APRIL, PERFORMANCE TESTING WILL BE UNDERWAY FOR THE




TWO FGD SYSTEMS.  NO START-UP PROBLEMS ARE REPORTED.

-------
                                                                             STATUS TU APRIL  1979
                                      SECTION  9 (CONTINUE!})

             PERFORMANCE DESCRIPTION FOK OPERATIONAL FGU SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION  NAME
  INSTALLATION  LOCATION
  SOURCE  CHARACTERISTICS
  SOURCE  RATING
  NUMBER  OF  SEPARATE  FGO UNITS
  NUMBER  OF  BOILERS BEING CONTROLLED
  SOURCE  CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW  / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  802  REMOVAL EFFICIENCY
  SLU06E  OR  BY-PRODUCT  DISPOSAL
  CONTROL SYSTEM COST
CATERPILLAR TRACTOR CO.
MUKTON, ILLINOIS
COAL (3.2X SULFUR)

36,000 SCFM (TOTAL • 2 80ILEKS)
19 Mh (EQUIVALENT ); TOTAL 2 BOILERS
((•OK THIS KEPUKT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EQUIVALENT MW.
THIS I.S BECAUSE GAS FLOW HATE IS THE PRIMARY FACTOR IN MUOOLE SIZING.)
ZUKN INDUSTRIES
DOUBLE ALKALI (DILUTE)
RETROFIT
JANUARY, 1978

OPERATIONAL
90X (£000 PPM a) INLET)
OEWATEHED SLURHY TO LANDFILL
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
   AT  THE  MORTON  PLANT,  A PARTS DISTRIBUTION CENTER* CATERPILLAR TRACTOR OPERATES A TwO-BOILER STEAM
PLANT  WHICH  GENERATES  A  TOTAL OF 66,000 ACFM AT 450 f AT MAXIMUM LOAD.  THE STOKER COAL-FIRED
BOILERS' ARE  MANUFACTURED BY HICKS AND ARE RATED FOR 60,000 LB/HR STEAM EACH AT  150 PSIG.  AN OIL-

FIRED  BOILER RATED  AT  120,000 LB/HR STEAM IS AVAILABLE AS SACK-UP.  HEAT INPUT  IS 70.7 MM BTU/HR.
THE HEATING  VALUE OF  THE COAL IS 10,400 BTU/LB.
    EMISSIONS  ARE  CONTROLLED BY A ZURN INDUSTRIES AIR QUALITY CONTROL SYSTEM CONSISTING OF A DUS-

TRAXTOR  SCRUBBER  IN WHICH PARTICULATE AND 302 REMOVAL OCCUR SIMULTANEOUSLY.  SULFUR DIOXIDE REMOVAL
IS BROUGHT ABOUT  BY THE  USE OF ZURN DILUTE MODE DOUBLE ALKALI FGD TECHNOLOGY.   THE TWO BOILERS AND
THE TNO  SCRUBBING TRAINS AND MOST ANCILLARY EQUIPMENT ARE WITHIN THE BOILER HOUSE.
   THE SYSTEM AT  MORTON  IS VERY SIMILAR TO THAT AT THE CATERPILLAR JOLIET PLANT, WHICH HAS BEEN
OPERATING  EACH  HEATING SEASON SINCE OCTOBER 1971.  WHENEVER POSSIBLE, PROBLEM AREAS AND
SOLUTIONS  IDENTIFIED  IN  JOLIET OPERATIONS HAVE BEEN IMPLEMENTED TO IMPROVE THE  SYSTEM DESIGN
AT MORTON.   SPECIFIC  AREAS IN WHICH MODIFICATIONS TO DESIGN HAVE BEEN MADE ARE  WATER BALANCE,
PUMPS, PH  MONITORING,  PIPING, LIME STORAGE, AND COLD WEATHER PROTECTION.
    REFER TO FIGURE  14-7 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF  THIS SYSTEM.
                                         OPERATING HISTORY
1ST BUARTER-1978     SYSTEM START-UP OCCURRED AT THE BEGINNING OF JANUARY.  INITIAL OPERATIONS MERE
PROBLEM-FREE.   THROUGH  JANUARY  AND PART OF FEBRUARY, ZURN PERSONNEL WERE TRAINING THE BOILER PLANT

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS



CATERPILLAR TRACTOR CO.) MORTON, ILLINOIS  (CONTINUED)





PERSONNEL IN THE OPERATION OF THE F6D SYSTEM.  OPERATIONAL EXPERIENCES AT JOLlET AND MQSSVILLE HAVE



SHOWN THAT THE BOILER OPERATORS CAN BE EFFECTIVELY TRAINED TO OPERATE AND MAINTAIN THE FGD SYSTEMS.



CURRENT PLANS CALLED FOR ACCEPTANCE TESTING IN THE SPRING, BUT THE COAL SITUATION MAY DELAY THE TEST



PERIOD.





ZND OUARTER-197S   FGD OPERATIONS CONTINUED TO BE TROUBLE-FREE.  THE BOILER HAS EXPERIENCING SOME



PUFFING (BACK PRESSURE), THE CAUSE OF WHICH MAS NOT KNOWN.







3RD OUARTER-197*   ACCEPTANCE TESTING WAS DELAYED DUE TO THE PUFFING PROBLEM.  THE TESTING



WILL BE ATTEMPTED LATE THIS FALL.  EVEN THOUGH PUFFING REMAINS A PROBLEM, PLANT PERSONNEL PEEL THEY



ARE CLOSER TO RESOLVING IT DUE TO NEW DESIGN MODIFICATIONS TO THE SCRUBBER.





4TH QUARTER-J97S     DURING THIS QUARTER, THE PUFFING PROBLEM NAS CORRECTED.  THE PUFFING PROBLEM



WAS A RESULT OF SEVERE PRESSURE PULSATIONS INSIDE THE ABSORBER DURING OPERATIONS.  INSTANTANEOUS



PRESSURE DROPS OF 10 INCHES H.G. ACROSS THE SCRUBBER OCCURRED SEVERAL TIMES.  ZURN INDUSTRIES PER-



SONNEL TRIED TO SOLVE THE PROBLEM BY INSTALLING TURNING ELBONS IN THE STACK, BUT THIS FAILED TO



SOLVE THE PROBLEM.  FINALLY PLANT PERSONNEL INSTALLED WINDOWS IN THE ABSORBER AND THROUGH THE USE



OF SPOTLIGHTS OBSERVED THE ACTION OF BLOWING COLD AIR THROUGH THE ABSORBER.  IT HAS NOTICED THAT A



HAVE BEGAN TO PROPAGATE BACK AND FORTH ACROSS THE ABSORBER CAUSING THE WATER LEVEL AT THE BOTTOM



OF THE OOWNCOMER CHANNELS TO DROP BELOW THE BOTTOM OF THE CHANNELS.  GAS MAS THEN ALLOWED TO PASS



UP THE DONNCOMER CHANNELS (ONE ON EACH SIDE OF THE ABSORBER) INSTEAD OF THE NORMAL SCRUBBING TUBES



AND PREVENTED THE SCRUBBING LIQUOR TO RETURN TO THE BOTTOM POOL.  AS A RESULT, PULSATIONS OCCURRED



ALONG THE OOHNCOMER.  THE PROBLEM WAS SOLVED BY SEALING THE OOWNCOMER HITH WELDED PLATES EXCEPT FOR



THREE TUBES.  THESE TUBES WERE LONGER THAN THE ORIGINAL DOHNCOMER CHANNEL TO ENSURE THE TUBE BOTTOMS



REMAINED CONTINUOUSLY SUBMEMGED.



     SINCE THE PH PROBES CONTINUOUSLY BECAME PLUGGED AND GAVE FALSE READINGS, PH IS MEASURED HOURLY



WITH A MULTI-BAND LITMUS PAPER.



     AN INITIAL WATER BALANCE PROBLEM WAS CAUSED BY TOO MUCH WATEH ENTERING THE F6D SYSTEM AS PUMP



SEAL NATER.  IT WAS CORRECTED BY INSTALLING RUTAMETERS ON SEAL WATER LINES TO REGULATE FLOW.



     ACCEPTANCE TESTING HAS BEEN COMPLETED AND AN APPLICATION HAS SEEN SUBMITTED TO THE STATE FOR



A STATE PERMIT TO OPERATE.  THE PLANT BELIEVES THEY WILL RECEIVE THE FIRST SUCH PERMIT IN ILLINOIS



TO BURN HIGH SULFUR COAL IN AN INDUSTRIAL BOILER.
                                                50

-------
MONTH

JAN. 79
FEB. 79
BOILER
1
320
565
FGD
SYSTEM 1
108
563
OPEKA-
BILITYU)
33.8
99.6
RELIA-
BILITYU)
too
99.6
BOILER
2
590
555
                                                                             STATUS TO APRIL  1979
                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS
CATERPILLAR  TRACTOR  CO.I MORTON,  ILLINOIS (CONTINUED)

1ST QUARTER-1979     DURING THE REPORT PERIOD IN DECEMBER 1978 NEITHER OF THE BOILERS OPERATED.
THE OPERATING HOURS  It* JANUARY AND FEBRUARY FOLLOWS:
                                                                    F60      OPERA-      RELIA-
                                                                  SY3TEM 2  BILITYU)  BILITY(X)
                                                                   513          86.9        60.2
                                                                   548          98.7        81.5
IN MARCH,  UP TO THE  END  OF THE REPORT PERIOD* BOTH THE SYSTEMS OPERATED AT RELIABILITY VALUE CLOSE
TO 100S.   THE OPERABILITY OF FGD SYSTEM 1 IN JANUARY MAS LON BECAUSE THE SCRUBBER HAS NOT OPERATED
DUE TO A  MANPOWER SHORTAGE.  NO OPERATING PROBLEMS HAD OCCURRED.  DURING JANUARY AND FEBRUARY,
FOR BUILER 1 AND  SCRUBBER 1, MIST ELIMINATOR PLUGGING CAUSED DOWNTIME OF 50 HOURS AND 117 HOURS
RESPECTIVELY.  OTHER MAJOR DOWNTIME ON SCRUBBER 1 IN JANUARY WAS DUE TO FROZEN PIPE LINES.  ONE OF
THE CAUSES OF MIST ELIMINATOR PLUGGING APPEARS TO BE HIGH SOLIDS CONTENT IN THE SLURRY.  PLANT
PERSONNEL  FEEL THAT  PROPER CONTROL OF PROCESS CHEMISTRY WOULD ALLEVIATE THE PROBLEM.  DURING MARCH,
THE SLUDGE DEWATERING SYSTEM PIPING WAS CLEANED.  AN ACCIDENTAL MANUAL VALVE CLOSURE CAUSED 5
HOURS OF  DOWNTIME.  SOME LEAKAGE IN THE PACKING OF A POSITIVE DISPLACEMENT MOYNA PUMP WAS NOTED
IN MARCH.
    THE PLANT RECEIVED AN OPERATING PERMIT FROM ILLINOIS ENVIRONMENTAL PROTECTION AGENCY IN
FEBRUARY.   THIS WAS  ONLY THE SECOND SUCH PERMIT GRANTED IN  THE STATE OF ILLINOIS FOR A SYSTEM
BURNING HIGH SULFUR  COAL.

-------
                                                                             STATUS TO APRIL  1979

                                      SECTION  9 (CONTINUED)

             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL bOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE HATING

  NUMbtR OF SEPARATE FGD UNITS

  NUMbEH OF BOILERS BEING CONTROLLED

  souRCt CAPACITY




  CONTROL SrSTEM VENDOR

  CONTROL PROCESS

  NEW / RETROFIT

  STAKT-UP DATE

  CONTROL SYSTEM STATUS

  S02 REMOVAL EFFICIENCY

  SLUDGE OR BY-PHOOUCI DISPOSAL



  CONTROL SYSTEM COST
CATERPILLAR TRACTOR CO.

MOSSVILLE, ILLINOIS

COAL (i.2X SULFUR)

l«0,000 SCFM (TOTAL - a BOILERS)
70 Mfc (EQUIVALENT); TOTAL - 4 BOILERS

(FOR (HIS REPORT, UNLESS STATED OTHERWISE* 2000 SCFM » 1 EQUIVALENT MM,
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

FMC ENVIRONMENTAL EQUIPMENT

DOUbLE ALKALI (CONCENTRATED)

Z Hit, 2 RETRO

OCTOBER, 1975

OPERATIONAL

90tX (£000 PPM H INLET)

DEttATERtO SLURRY TO LANDFILL

60+X SOLIDS (CAS04) SLUDGE DIRECTLY TO LANDFILL

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

     AT THE MOSSVILLE PLANT, CATERPILLAR TRACTOR OPERATES A FOUR-BOILER STEAM PLANT.  TWO OF THE

ttOILEHS ARE RATED AT 1SO.UOO LflS/MR STEAM AND TMO ARE RATED AT SO,000 LflS/MR STEAM.  THE ENTIRE

1-UNIT PLANT IS ROUGHLY EQUIVALENT TO 70 MM OF ELECTRICAL GENERATING POWER.  THE COAL FIRED IS

HIGH-SULFUR (3.2X-4.0X) ILLINOIS COAL.  THE FOURTH BOILER. AT 150,000 LBS/HR, BEGAN OPERATIONS

IN JUNE 1977 AMU ITS FGD SYSTEM NAS BYPASSED UNTIL OCTOBER 1977.  THE TftO MUST RECENTLY INSTALLED

BOILERS HAVE MECHANICAL COLLECTORS PRECEEDING THE SCRUBBERS.

     FMC ENVIRONMENTAL EUUIPMENT DIVISION HAS SUPPLIED AN AIR QUALITY CONTROL SYSTEM CONSISTING OF A

VENTUHI SCRUBUEH FOR PARTICULAR CONTROL AND AN ABSORBER MODULE FOR S02 CONTROL.  FMC CONCENTRATED

MODE, DOUBLE ALKALI FGD TECHNOLOGY IS BEING USED IN THE ABSORBER MODULES.  THE TMO 150,000

L0/HR BOILERS HAVE MECHANICAL COLLECTORS REMOVING ABOUT 90S OF THE INLET FLYASH.  THE SCRUBBING

TRAINS ON THE TWO SMALLER BOILERS HAVE NO PRECEDING MECHANICAL COLLECTORS.  THE POSITION OF THE

VENTURI CAN BE  CONTROLLED AUTOMATICALLY BY STEAM FLOW, BUT CURRENTLY IS NOT IN OPERATION.

     MHILE THE  FLYASH IN THE FINAL FILTER CAKE PROVIDES ADOEO MECHANICAL STABILITY, THE HIGH ASH

CONTENT IN THE  RECIRCULATING SLURRY CAUSED SEVERE EROSION/ABRASION PROBLEMS IN EARLY OPERATIONS.

THE ORIGINALLY  INSTALLED MEIR-TYPE CONTROL VALVES HAVE BEEN REPLACED nITH SPOOL PIECES AND A

CONSTANT VOLUME PUMPING SYSTEM.  THERE HAS ALSO SIGNIFICANT NEAR IN THE VENTURI SCRUBBER BOTTOMS,

WHICH NAS SOLVED BV THE INSTALLATION OF HEAR PLATES.

     SEVERAL PROBLEM AREAS MERE IDENTIFIED AND DEALT NITH DURING THE TNO HEATING SEASONS PRIOR TO

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)



             PERFORMANCE  DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS



CATERPILLAR  TRACTOR  CO.)  MOSSVILLE,  ILLINOIS (CONTINUED)





THE 1977-78  SEASON.   THESE ARE LISTED BELOW.



     PUMPS - THE  RUBBER-LINED SLURRY PUMPS MERE OVERSIZED WHICH CAUSED HIGH PIPE VELOCITIES AND



ACCELERATED  WEAR  ON  THE PUMP LININGS.  THESE PUMPS WERE REVISED TO LOWER THEIR OUTPUT.  LOW SEAL



HATER PRESSURE  ALLOWED PROCESS LIQUOR TO GET INTO THE PUMP AND PACKING.  ALL SEAL WATER



IS NOW ONCE-THROUGH  AND SYSTEM PRESSURES HAVE BEEN ADJUSTED TO MAINTAIN SEAL WATER PRESSURE



ABOVE PROCESS LIQUID PRESSURES.



	SLUpSE  HANDLING "SLUDGE IS TRANSPORTED FROM THE VACUUM FILTERS TO THE LOADING AREA ON A BELT



CONVEYOR.  SEVERAL STRATEGIESr ALL INVOLVING SCRAPING OR PLOWING THE DEWATERED SLUDGE OFF THE BELT,



RESULTED  IN  EXCESSIVE WEAR OF EITHER THE BELTS OR THE PLOaS.  THE PRESENT APPROACH SIMPLY DUMPS



THE MATERIAL OFF  THE END OF THE BELT INTO BINS.  THE POSITION OF THE BELT IS CHANGEABLE SO THAT



EI6HT BINS CAN  BE FILLED  BEFORE THEY MUST BE EMPTIED. A FURTHER MODIFICATION HAS A DUAL POSITION



CHUTE UNDER  EACH  BELT END POSITION,  SO THAT A TOTAL OF 16 BINS CAN BE WORKED AT A TIME.



SLUDGE 8INS  ARE THEN LOADED HYDRAULICALLY INTO TRUCKS AND HAULED TO THE SANITARY LANDFILL AREA.



ANOTHER PROBLEM,  COLD WEATHER ICING ON THE SLUDGE LOADING AREA, WAS SOLVED BY ENCLOSING THE AREA.



     INSTRUMENTATION - ORIGINAL DESIGN PLANS CALLED FOR CONTROL BY THE MONITORING OF THE 303/304



RATIO AND SODIUM  ION CONCENTRATION.   THE CONTROL RANGE WAS FOUND TO BE TOO SMALL AND THE PRESENT



APPROACH  IS  PH  CONTROL (6.5) AND CLEANING OF THE PROBES EVERY OTHER DAY.



     ORIGINAL DESIGN DID NOT MONITOR 302 CONCENTRATION BUT A COMPLETE MONITOR SYSTEM WAS INSTALLED



PRIOR TO  THE 1977-78 SEASON.



     PIPING  - MODIFICATIONS HAVE BEEN MADE WHICH FACILITATE CLEANING OR SCHEDULED REPLACEMENT.



    REFER TO FIGURE  14-ft IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.







                                         OPERATING HISTORY



4TH OUARTER-1977     CATERPILLAR BEGAN A PROCEDURE OF DETAILED RECORD KEEPING, BUT THE INFORMATION



MAS NOT YET  AVAILABLE TO THIS REPORT.





2ND OUARTER-1978     NUMEROUS BOILER-RELATED PROBLEMS HAVE COMPOUNDED FGD SYSTEM PROBLEMS.  MAJOR




FGO PROBLEM  AREAS WERE AS FOLLOWS;



    EROSION  OF  SCRUBBER LINER MATERIAL.



    EXCESSIVE WEAR OF PIPING, PUMPS, AND CONTROL VALVES.



    SLUDGE FREEZE-UP ON THE CONVEYOR BELT PLUGGED SLUDGE CHUTES.







3RD QUARTER-1978     PERFORMANCE OF THE VENTURI SPRAY NOZZLES HAS NOT BEEN SATISFACTORY.  NOZZELS OF



3161. S3 WERE ORIGINALLY INSTALLED AND LASTED ABOUT FOUR MONTHS.  CERAMIC NOZZLES WERE THEN TRIED BUT



BROKE NHEN BEING  REMOVED.  THE PLANT RETURNED TO USING 316L S3 SINCE THE STEEL NOZZLES WERE CHEAPER



THAN THE  CERAMIC  NOZZLES.  PLANS ARE BEING MADE TO MODIFY THE NOZZLE CONFIGURATION.  THE VENTURI



U BEING  OPERATED MANUALLY SINCE PLANT PERSONNEL HAVE NOT HAD TIME TO DEBUG THE AUTOMATIC CONTROL.








                                                S3

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL F60 SYSTEMS ON INDUSTRIAL BOILERS



CATERPILLAR TRACTOR CO.F MOSSVILLE, ILLINOIS (CONTINUED)





    END-DISCHARGING DISH CONVEYORS FOR THE SLUDGE CONVEYOR SYSTEM HAVE NOT VET BEEN INSTALLED



BECAUSE THE ENTIRE SLUDGE HANDLING FACILITY IS CURRENTLY BEING REEVALUATED. THIS REEVALUATION 18



A RESULT OF THE MANY PROBLEMS CATERPILLAR HAS HAD NITH THEIR SLUDGE HANDLING SYSTEM.



    MODIFICATIONS TO PIPING IN ORDER TO FACILITATE PIPE CLEANING AND SCHEDULED REPLACEMENTS HAVE NOT



BEEN SIGNIFICANT.  THE GUILLOTINE DAMPERS AT THIS PLANT ARE EXPERIENCING THE SAME PROBLEMS AS THE



DAMPERS AT THE JOLIET PLANT> FLYASH COLLECTING IN THE BOTTOM OF THE DAMPER PREVENTS THE DAMPER FROM



BEING CLOSED TIGHTLY.  NEAR PLATES MERE INSTALLED IN THE BOTTOM OF THE VENTURI SCRUBBERS TO PREVENT



ABRASIVE WEAR AND ARE WORKING NELL.  PLANT PERSONNEL FEEL THEY ARE STILL IN A DEBUGGING PHASE.







4TH QUARTER-1976    PLANT PERSONNEL DESCRIBED THE FGD SYSTEM OPERATION AS SPORADIC AND FLUCTUATING.



PROBLEMS ARE ENCOUNTERED. CONTINUOUSLY CAUSING SYSTEM SHUTDOWN.  EROSION CONTINUES TO BE A SIG-



NIFICANT PROBLEM.  VALVES, FITTINGS* LININGS, PUMPS. FANS* AND SCRUBBER NOZZLES ARE ALL ERODING.



THE NEAR PLATE INSTALLED IN THE BOTTOM OF THE SCRUBBER HAS SLOWED THE EROSION THERE.



    THE VENTURI NOZZLE CONFIGURATION WAS NOT CHANGED AND THE VENTURI IS STILL OPERATED MANUALLY.



    THE SLUDGE HANDLING FACILITIES HAVE NOT BEEN REEVALUATED OR CHANGED YET.  FILTER FABRIC NEAR AND



    SLUDGE FREEZE-UP CONTINUE TO BE A PROBLEM.



    A MAINTENANCE PROGRAM TO CLEAN THE GUILLOTINE DAMPER OF FLYASH HAS NOT YET BEEN DEVELOPED.



    AN EMISSIONS TEST IS SCHEDULED FOR LATE JANUARY OR EARLY FEBRUARY 1979.







1ST QUARTER-1979    THE PLANT PERSONNEL REPORTED THAT THE FGD SYSTEM OPERATION CONTINUES TO BE



FLUCTUATING AND SPORADIC.  EARLIER PROBLEMS CONTINUE TO CAUSE SYSTEM SHUTDOWNS.  THE MAJOR PROBLEMS



ARE MIST ELIMINATOR PLUGGING. CHEMICAL INBALANCE. WEAR ON PIPES AND MANUAL OPERATION OF THE VENTURI.



IN ADDITION. DRY CHEMICAL HANDLING IS ALSO A MAJOR PROBLEM.  SODA ASH HAS NOT BEEN AVAILABLE IN



SUFFICIENT QUANTITY.

-------
                                                                             STATUS TO APRIL  1979
                                       SECTION  9  (CONTINUED)
             PERFORMANCE DESCRIPTION  FOR  OPERATIONAL FGD SYSTEMS UN INDUSTRIAL BOILERS
  INSTALLATION NAME.
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING

  NUMBER OF SEPARATE FGU UNITS
  NUMBER OF BOILERS BEING CON!HULLED
  SOURCE CAPACITY
  CONTROL SYSJEM VENDOR
  CONTROL PROCESS
  NEK / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  S02 REMOVAL EFFICIENCY
  WATER MAKE-UP
  8LU06E ON BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
CHfcVKUN U.S.A.  INC.
6AKE&5FIELD,  CALIFORNIA
OIL U.U SULFUR)
2«8,OuO SCFM (TOTAL  - 16 BOILERS)
150,000 ACFM i  SOOF,  FUR EACH OF 3 FGD SYSTEMS.
 3
IB
125 MM (EQUIVALENT)!  TOTAL " 16 BOILERS
900 MM BTU/HH (TOTAL - IB BOILERS* 6 BUILEKS/FGD  SYSTEM)
(FOR THIS REPORT,  UNLESS STATED OTHERWISE^  2UUO SCFM  *  1  EUUIVALENT MM.
THIS IS BECAUSE GAS  FLOW RATE IS THE PRIMARY  FACTOR  IN  MODULE  SUING.)
KOCH ENGINEERING
SODIUM CARBONATE SCRUBBING
RETROFIT
JULY,  1976
OPERATIONAL
90X (70 PPM «l OUTLET)
75 &PM
WASTEWATER TREATMENT AND DISCHARGE TO TAILINGS POND
SEE SECTION 13  FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION
     CHEVRON U.S.A. HAS AN OIL SITE AT BAKERSFIELO, CALIFORNIA.  THERE ARE ABOUT 50 STEAM GENERATORS
NHICH BURN l.U SULFUR CRUDE OIL.  EACH GENERATOR  IS RATED AT 50 MM BTU/HK.  THE STEAM IS USED FOR
ENHANCED OIL RECOVERY FROM THE OIL "ELLS.
     KOCH ENGINEERING COMMISSIONED THREE FGD SYSIEMS IN JUNE/JULY 1970.  THE SODIUM CARBONATE
SCRUBBING PROCESS IS USED.  EACH SCRUBBER 1HEA1S FLUE GASES FROM 6 GENERATORS WITH A TOTAL
FLOW RATE OF 150*000 ACFM AT 5UO F.  THE GAS IS UUENCHED IN THE BOTTOM PORTION OF THE ABSORBER BY
120 6PM OF THE RECIRCULAUNG L1CIUOR.  THERE ARE 6  KOCH FLEXITHAYS AND A KOCH FLEXlMtSH MIST
ELIMINATOR IN EACH SCRUBBER.  THE SPENT LIQUOR IS  MIXED WllH FRESH SODIUM CARBONATE SOLUTION IN THE
BOTTOM OF THE SCRUBBER.  A CONTINUOUS BLEED STREAM  (9 5PM) IS TAKEN TO A BLEED STORAGE TANK,
WHEREAS THE REST OF THE LlbUOft IS RECIRCULATEO AT  A TOTAL RATE OF 900 GPM (15 MTX DISSOLVED SOLIDS).
A PH OF 6.5 IS MAINTAINED AT THE TOP TRAY AND AN L/G RATIO OF 6 GAL/1000 ACF IS USED.  THERE IS
NO REHEAT FACILITY BUT THE SCRUBBER CAN BE BYPASSED.  THE BOILER 1.0. FANS WERE UPGRADED
FROM SO HP TO 75 HP TO OFFSET THE PRESSURE DROP OF 9 IN. WG. ACROSS THE ABSORBER.  THE SCRUBBERS ARE
OE3IGNEO 10 REMOVE 9UX OF THE 302 AND MAINTAIN AN EXIT S02 CONCENTRATION BELOW 70 PPM.  EACH
SCRUBBER IS 16.5 FT IN OIAMETER AND 35 FEET HIGH.  THE STUB STACK SITUATED ON TOP OF EACH SCRUBBER
IS ABOUT 20 FEET HIGH AND 6 FEET IN DIAMETER.  THE SCRUBBERS AND TRAYS ARE MADE OF 316L S3 AND THE
                                                55

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL F6D SYSTEMS ON INDUSTRIAL BOILERS



CHEVRON U.S.A. INC.» BAKERSFIELO, CALIFORNIA (CONTINUED)





FLEXIMESN IS INCOLOT 825.  THE STACK IS MADE OF 316 SS AND THE PIPING IS FRP.



     REFER TO FIGURE 14-9 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.







                                       OPERATING  HISTORY



3RD OUARTER-1978    BECAUSE OF LOW STEAM DEMAND ONLY TNO OF THE EXISTING THREE SCRUBBERS ARE OPERA-



TIONAL (OUT OF THE 16 STEAM GENERATORS 12 ARE OPERATIONAL).  ONE SCRUBBER CONTROLS 7 GENER-



ATORS NHILE THE OTHER CONTROLS 5 GENERATORS.  THE REMAINING 6 STEAM GENERATORS AND THE CORRESPOND-



ING SCRUBBER MILL BE BROUGHT ON-LINE AS STEAM DEMAND INCREASES (POSSIBLY IN DECEMBER OR JANUARY).



     NO MAJOR PROBLEMS HAVE OCCURRED SINCE START-UP IN JUNE-JULY 1978.  HOWEVER, SOME CLOGGING OF



THE SODA ASH FEED CHUTE FROM THE STORAGE SILO DOES OCCUR.  THIS CLOGGING IS EASILY CORRECTED WITH NO



DOWNTIME NECESSARY.  SYSTEM OPERABILITY FOR THE PERIOD MAS 951.



     GOOD OPERATION IS ATTRIBUTED TO REGULAR MAINTENANCE PRACTICE WITH EMPHASIS ON DAILY CLEANING OF



THE PH PROBES.







4TH OUARTER-1978   SYSTEM AVAILABILITY OF 100X WAS REPURTED FOR THIS PERIOD.  THERE HERE NO



SCALING OR PLUGGING PROBLEMS.  ROTATING EQUIPMENT (FANS, PUMPS) HAVE OPERATED NITHOUT TROUBLE.  THE



MIST ELIMINATOR MASH FREQUENCY is TWICE A DAY, ABOUT 20 MINUTES AT A TIME, APPROXIMATELY so GPM



FLOW OF FRESH MATER.







1ST OUARTER-1979    THE VIBRATING FEEDER AND THE SCREW CONVEYOR ON THE SODA ASH SILOS MAY BE



REPLACED TO ELIMINATE FEED CHUTE CLOGGING.  APART FROM THIS MINOR PROBLEM, THE SYSTEMS OPERATED



TROUBLE-FREE DURING THIS PERIOD WITH 100* AVAILABILITY.  THE SODA ASH CONSUMPTION (ABOUT 1.25



LB/LB S02 REMOVED) IS LOW ENOUGH TO BE FAVORABLE OVER CAUSTIC.



    JHE BLEED FLOW RATE (9 GPM) is SET so AS NOT TO EXCEED 1000 PPM CHLORIDES IN THE RECIKCULATION



LOOP.  THIS CORRESPONDS TO A PH OF 6.6, SPECIFIC GRAVITY OF 1.15 AND TOTAL DISSOLVED SOLIDS OF



15 X BY WEIGHT.
                                                56

-------
                                                                              STATUS  TO  APRIL   1979

                                       SECTION   9  (CONTINUED)

              PERFORMANCE DESCRIPTION FUR OPERATIONAL  FGD  SYSTEMS  ON  INDUSTRIAL  BOILERS
   INSTALLATION  NAME

   INSTALLATION  LOCATION

   SOURCE CHARACTERISTICS

   SOURCE RATING



   NUMBER UF  SEPARATE  FGO UNITS

   NUMBER OF  BOILERS BtINC, CONTROLLED

   SOURCE CAPACITY




   CONTROL SYSTEM VENOUR

   CONTROL PROCESS

   Nfcw / RETROFIT

   START-UP DATE

   CONTROL SYSTEM STATUS

   S02 REMOVAL EFFICIENCY

   PARTICULATE REMOVAL  EFFICIENCY

   WATER MAKE-UP

   SLU06E OR  BY-PRODUCT  DISPOSAL



   CONTROL SYSTEM COST
DOUBLE BARREL OIL CD.

UAKEHSFIELD,  CALIFORNIA

OIL 11.U SULFUR)

12.000 SCFM (1 BOILER)

34,000 ACFM a 550 F.

 1

 1

ft MN CEUUIVALENT)

(FOR THIS REPORT, UNLESS STATED OTHERWISE,  2000 3CFM t 1  EQUIVALENT  MN.
THIS IS BECAUSE GAS FLO* RATE IS THE PRIMARY FACTOR  IN MODULE  SIZING.)

C-E NATCO

SODIUM HYDROXIDE SCRUBBING

NEW

JUNE, 1978

OPERATIONAL

9bX (650 PPM S02 » INLET)



6.5 GPM

NON-FIXATED SLURRY TO LINED POND

1.5 GPM BLEED-OFF STREAM TO SETTLING POND.

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

    DOUBLE BARREL OIL  IS ONE  OF  SEVERAL  SMALL,  INDEPENDENT  OIL  COMPANIES  IN  BAKERSFIELDr CALIFORNIA.

THE EOR OPERATIONS UF  THE DOUBLE BARREL  OIL COMPANY  CONSIST OF  ONLY  ONE 50 MM BTU/HR STEAM

GENERATOR.  THE FUEL BURNED  IS A PART  OF THE CRUDE OIL  PRODUCED U.1I  SULFUR).

    THE FGD SYSTEM MAS SUPPLIED  NEW  ALONG WITH  THE STEAM  GENERATOR BY  C-E NATCO IN APRIL 1976.

THIS SYSTEM HAS THE FIRST FULL-SCALE DEMONSTRATION OF THE C-E NATCO  DESIGN IN THE CALIFORNIA OIL

FIELDS.  THE ORIGINAL  DESIGN  CONSISTED OF 'A UUfcNCHER AND  AN ABSORBER,  WITH THE ABSORBER BLEED

STREAM BEING RECIRCULATED IN  THE QUENCHER 'BEFORE BEING  DISPOSED OF;  SEVERAL LAYERS OF SPRAYS MERE

PROVIDED IN BOTH OF THE TONERS TO VARY THE L/G  RATIOS OVER  A MIDE RANGE, ALONG WITH THE MAXIMUM

HORSEPOWER MOTORS ON THE PUMPS.   IN  THE  INITIAL 2-3  MONTHS  PERIOD, AN  EXTENSIVE TEST PROGRAM HAS

CONDUCTED BY C-E NATCO IN ORDER  TO CORRELATE SEVERAL PROCESS PARAMETERS TO 802 REMOVAL, PARTICULATE

REMOVAL, AND ALKALI UTILIZATION.   DOUBLE BARREL HAS  MODIFIED THE OPERATING PROCEDURE AS FOLLOWS!

    THE FLUE GAS (24,000 ACFM a  b50  F) IS[CONTACTED  WITH  THE FIRST LAYER OF SPRAYS IN THE BOTTOM

OF THE ABSORBER, WHERE A PH OF 6.0 IS  MAINTAINED.  THE  GAS  RISES UP  THROUGH THE CENTRAL OOMNCOMER

OF A 'CHIMNEY-TRAY*, AND CONTACTS  THE  SECOND SET OF  SPRAYS  WITH A PH OF 6.8.  A L/G RATIO OF

25 GAL/1000 SCF IS MAINTAINED IN  BOTH  THE{STAGES.  THE  GAS  PASSES THROUGH A CHEVRON MIST ELIMINATOR
                                                57

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL F60 SYSTEMS ON INDUSTRIAL BOILERS



DOUBLE BARREL OIL CO.f BAKERSFIELD, CALIFORNIA (CONTINUED)





AND A STUB STACK TO THE ATMOSPHERE.  FRESH CAUSTIC (SO MT. X) IS ADDED TO THE SECOND STA6E



(0.13 6PM), WHILE MAKEUP NATER IS ADDED TO THE FIRST STAGE (9.5 6PM).  A CONSTANT BLEED-OFF STREAM



(1.5 GPM) IS WITHDRAWN FROM THE BOTTOM STAGE AND TAKEN TO A SETTLING POND.  THE ENTIRE FGD SYSTEM



(ABSORBER, TRAY, RECIRCULATION PUMP, PIPING, DUCTNORK, MIST ELIMINATOR, AND STACK) ARE MADE OF



316L SS, EXCEPT FOR THE CAUSTIC TANK, PUMP, AND PIPING WHICH ARE CARBON STEEL.








                                         OPERATING HISTORY



1ST QUARTER 1979    THE RELIABILITY VALUE OF THE FGD SYSTEM MAS ABOUT 99X.  THERE WERE TMO SHORT



SHUTDOWNS (4 HOURS EACH) DUE TO FAILURE OF THE RECIRCULATION PUMP SEAL* WHICH HAS REPLACED.

-------
                                                                             STATUS TU APRIL  1979
                                      SECTION  9  (CONTINUED)
              PERFORMANCE  DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION  NAME
  INSTALLATION  LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBER OF SEPARATE  FSO  UNITS
  NUMBER OF BOILERS BEING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEM / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  802 REMOVAL EFFICIENCY
  PARTICULATE REMOVAL EFFICIENCY
  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COSI
FIRESTONE TIRE AND RUBBER CO.
POTTSTOMN, PENNSYLVANIA
COAL (2.5 - 3.OS SULFUR)
8070 SCFM (13,000 ACFM *  300 F)
 1
 1
4 MM (EQUIVALENT)

(FOR THIS REPORT. UNLESS  STATED  OTHERWISE,  2000  SCFM  s  1 EQUIVALENT MW.
THIS IS BECAUSE GAS FLOW  RATE IS THE  PRIMARY  FACTOR  IN  MODULE  SIZING.)
FMC ENVIRONMENTAL EQUIPMENT
DOUBLE ALKALI (CONCENTRATED)
RETROFIT
JANUARY, 1975

OPERATIONAL
90.51 (1000 PPM a INLET)

97.4X (5 LB/MM 8TU it INLET TO MECHANICAL) COLLECTOR.)
DEWATERED SLURRY TO LANDFILL
SEE SECTION 13 FOR DETAILED ECONOMIC  INFORMATION
                                        BACKGROUND  INFORMATION
    THE FIRESTONE TIRE AND  RUBBER  CO.  LOCATED  IN POTTSTONN, PENNSYLVANIA HAS BEEN OPERATING AN FGO
SYSTEM SINCE JANUARY 1975 AS  A  DEMONSTRATION-SIZE  PLANT, DESIGNED TO TEST THE FEASIBILITY OF FGD
ON INDUSTRIAL BOILERS,  THE UNIT  IS  DEMONSTRATING  90 PERCENT S02 REMOVAL EFFICIENCY AND TREATS
A FLUE CAS CAPACITY OF 13,000 ACFM OR  3 MW  (EQUIVALENT).  THIS FLOW REPRESENTS APPROXIMATELY
1/3 OF THE TOTAL OUTPUT OF  ONE  120,000  LB/HR STEAM BOILER.  THE SULFUR DIOXIDE EMISSION REGULATION
FOR THE PLANT IS 0.86 L8S/MILLION  BTU  OF HEAT  INPUT.
    THE PLANT IS USING THE  CONCENTRATED DOUBLE ALKALI PROCESS PATENTED BY FMC CORPORATION.  THE LOAD
CAPACITY OF THE BOILER ON NHICH THE  SCRUBBER IS OPERATING IS APPROXIMATELY 15 MM.  IN OCTOBER 1976,
THE BOILER WAS CONVERTED FROM BURNING  RESIDUAL FUEL OIL (2.2X S) TO COAL (2,5-3.OX S).
    THE VENTURI SCRUBBER IS SPRAYED  WITH ALKALINE  LIQUOR WHERE THE FLUE GAS ENTERS.  THE FAN AND
DAMPER UPSTREAM OF THE VENTURI CONTROL  THE FLUE GAS FEED.  SCRUBBING LIQUOR FLOWS FROM THE VENTURI
TO THE BOTTOM OF THE CYCLONE OEMISTER  AND THEN INTO THE RECIRCULATION TANK.  DROPLETS OF SCRUBBING
LIQUOR ARE SPUN OUT IN THE CYCLONE AND  RUN BACK OONN INTO THE RECIRCULATION TANK.  THE SCRUBBING
LIQUOR 13 PARTLY RECIRCULATEO TO THE VENTURI THUS  COMPLETING THE SCRUBBING CYCLE.  ACCUMULATION OF
SOLUBLE SODIUM BISULFITE IS PREVENTED BY CONTINUOUSLY DRAWING OFF A SMALL STREAM OF SCRUBBER SOLU-
TION TO THE LIME REACTOR TANK WHERE  THE SODIUM SULFITE REACTS WITH LIME TO FORM CALCIUM SULFITE AND
SODIUM HYDROXIDE WHICH IS RECYCLED TO THE ABSORBER.   CALCIUM SULFITE SLURRY IS TRANSFERRED TO THE
ROTARY FILTER.  THE FILTER CAKE FORMED  (180 LBS/HH, SSX SOLIDS)  IS HAULED TO THE LANDFILL.  THE
                                                59

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOH OPERATIONAL F60 SYSTEMS ON INDUSTRIAL BOILERS



FIRESTONE TIRE AND RUBBER CO. I POTTSTUKN, PENNSYLVANIA  (CONTINUED)





HATER BALANCE 13 MAINTAINED BY MAKING UP FOR THE LOSSES  BY EVAPORATION AND IN THE FILTER CAKE.



    THE VENTURI SCRUBBER HAS A VARIABLE THROAT (6 IN. TO 15 IN.) AND IS HADE OF 316L SS.  THE OPER-



ATING VELOCITY THROUGH THE VENTURI THROAT IS 200 FT/SEC  i 130 F,  THE OPERATING L/6 IS 10 GAL/



1000 ACF.  THE SPRAY NOZZLES ARE ALSO MADE OF 316L SS.   THE CYCLONIC DEMI8TER 14.67 FT DIA X 7.17



FT HIGH) OPERATES WITH A PRESSURE DROP OF 2* HG.  GAS VELOCITY THROUGH THE DEMISTER IS 100 FT/SEC



8 130 F.  THE DEMISTER, RECIRCULATION TANK, AGITATOR, RECIRCULATION PIPING, AND THE FILTER ARE MADE



OF 316L S3.  THE INLET OUCTNORK, F.D. FAN, THICKENER, ANO LIME REACTOR TANK ARE OF CARBON STEEL.



THE RECIRCULATION PUMP IS CAST IRON KITH KUBBER LINING AND THE STACK IS FRP.



    REFER TO FIGURE 14-10 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.








                                        OPERATING HISTORY



1ST QUARTER-1975    THE SYSTEM WENT ONSTREAM BURNING 2.2X SULFUR OIL.  THE FGD SYSTEM OPERATED 687



HOURS AND MAS CALLED UPON TO OPERATE 619 HOURS, YIELDING A RELIABILITY OF 64.SX.  DOWNTIME HAS DUE



PRIMARILY TO FAILURES OF COMPONENTS SUCH AS PUMP PACKING.








2ND OUARTER-1975    THE SYSTEM OPERATED 1454 HOURS AND MAS CALLED UPON TO OPERATE 1509 HOURS,



YIELDING A RELIABILITY INDEX VALUE OF 96.4X.








3RD OUAHTER-197S    SYSTEM OPERATED 1436 HOURS, HAS CALLED UPON TO OPERATE 1503 HOURS, YIELDING



A RELIABILITY INDEX VALUE OF 95.SS.








4TH OUARTER-1975    SYSTEM OPERATED 1320 HOURS, WAS REQUIRED TO OPERATE 1493 HOURS, YIELDING A RELI-



ABILITY INDEX VALUE OF B8.4X.  LIME FfcEDEH MALFUNCTIONING ANU THICKENER PLUGGING NEHE PROBLEMS.








1ST QUAftTER-1976    SYSTEM OPERATED 1961 HOUXS, MAS CALLED ON TU OPERATE 2UJ5 HUUKS, YIELDING A



RELIABILITY INDEX VALUE OF 96.4k.







2ND QUAMTER-1976    SYSTEM OPERATED 1280 HOURS, HAS CALLED UPON 10 OPERATE 1335 HOURS, YIELDING A



RELIABILITY INDEX VALUE OF 95.9X.







3RD OUAHTER-1976    SYSTEM OPERATED 1157 HOURS, HAS CALLED UPON TO OPERATE 1166 HOURS* THUS DEMON-



STRATING ITS HIGHEST RELIABILITY INDEX VALUE, 99.2*.







4TH OUARTER-1976    IN OCTOBER* THE SYSTEM OPERATED AT A RELIABILITY INDEX OF IOOX, UNTIL THE UNIT



MAS CONVERTED TO COAL FIRING (2.5 - 3.OX SULFUR).  THE SYSTEM OPERATED FOR AN ADDITIONAL 511 HOURS,



OF THE 526 REQUIRED, DEMONSTRATING A RELIABILITY INDEX VALUE OF 97.2X.  IN NOVEMBER AND DECEMBER,
                                                60

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS



FIRESTONE TIRE AND RUBBER CO.  I POTTSTONM, PENNSYLVANIA (CONTINUED) .





THE SYSTEM OPERATED FOR 1172 HOURS AGAINST THE REQUIREMENT OF 1211 HOURS.  THEREFORE,  THE AVERAGE



RELIABILITY  INDEX FOR THE TWO  MONTHS WAS 96.7*.







1ST OUARTER-1977    SYSTEM OPERATED 1193 HOURS, MAS REQUIRED TO OPERATE FOR 1459 HOURS, YIELDING  A



RELIABILITY  INDEX VALUE OF 81.7X.  SYSTEM MAS DESIGNED FOR A MUCH LOWER PARTICULATE LOADING THAN



THAT ACTUALLY ENCOUNTERED ON COAL FIRING.  THE HIGH GRAIN LOADING CAUSED ABNORMAL MEAR AND DOWNTIME



OF THE P.O.  FAN.







2ND QUARTER-1977    SYSTEM OPERATED 139ft HOURS* HAS REQUIRED TO OPERATE 1690 HOURS, YIELDING A



RELIABILITY  INDEX VALUE OF 62.7X.  THE MAJOR CAUSES OF DOWNTIME HERE F.D. FAN EROSION AND PUMP



COMPONENT FAILURES.







3RD OUARTER-1977    SYSTEM OPERATED 1131 HOURS, WAS REQUIRED TO OPERATE 1197 HOURS, YIELDING A



RELIABILITY  FIGURE OF 94.SS,   THE TOTAL REQUIRED HOURS WERE LOW IN JULY DUE TO BOILER HOUSE



SHUTDOWN AND SUBSEQUENT START-UP.







«TH OUARTER-1^77    IN OCTOBER* THE SYSTEM OPERATED 432 HOURS OUT  OF THE 5U REQUIRED AS THE BOILER



MAS FIRING COAL.  THE RELIABILITY VALUE MAS  THEREFORE  60.6X.  DOWNTIME WAS CAUSED BY PROBLEMS WITH



THE LIME CONVEYOR.  WHEN OIL WAS BEING FIRED THE SYSTEM OPERATED 95 OF THE 198 HOURS REQUIRED,



DEMONSTRATING A RELIABILITY VALUE OF  92.6X.  IN NOVEMBER AND DECEMBER, THE SYSTEM OPERATED 792 HOURS



OF THE REQUIRED 654, WHILE BURNING COAL,  YIELDING  A RELIABILITY OF 86.TX.  DOWNTIME MS CAUSED BY



FAN PROBLEMS AND LIME FEEDER PROBLEMS,







1ST QUARTER-1978    THE SPRAY  NOZZLES, ORIGINALLY  316  STAINLESS STEEL, MERE HEPLACED BY 316L 83.




THE SPRAY BARS HERE METALLIZED WITH 316 88.







2ND QUARTER-1978    THE FAN WAS REPLACED 8V  A  NEW  FAN  CONSTRUCTED  OF AN ABRASION RESISTANT CARBON



STEEL.  THE  FAN HOUSING WAS METALLIZED WITH  316 S3.  LEAKS  IN THE  VEMTURI SECTION AND DOWNSTREAM



DUCTWORK WERE REPAIRED.  THE FGD SYSTEM EXHIBITED  AN AVAILABILITY  OF 89.5* FUR THIS REPORT PERIOD.








3RD OUARTER-19T8    NO UNUSUAL PROBLEMS WERE ENCOUNTERED DURING THIS PERIOD.  DOWNTIME WAS DUE



TO NORMAL MAINTENANCE.  PRELIMINARY EN6INEERIN6 FOR THE FULL SCALE-UP SYSTEM IS COMPLETE.  FINAL



DESIGN WILL  BE DELAYED UNTIL THE ENERGY BILL CURRENTLY BEFORE CONGRESS IS FINALIZED.  PLANT



PERSONNEL ATTRIBUTE THEIR SUCCESSFUL  OPERATION OF  THE  FGD SYSTEM TO A GOOD UNDERSTANDING AND



IN-DEPTH KNOWLEDGE OF PROCESSES AND CONTROLS.

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS
FIRESTONE TIRE AND RUBBER CO. f POTTSTOWN, PENNSYLVANIA (CONTINUED)

4TH OUARTER-1978    IN OCTOBER, THE BOILER HAS DOWN FOR MAINTENANCE* HENCE THE SCRUBBER DID NOT OP-
ERATE.  DURING NOVEMBER AND DECEMBER,  THE SYSTEM OPERATED 311 HOURS OF A REQUIRED 332
HOURS* NHILE BURNING COAL* YIELDING A RELIABILITY OF 93.7X.  DOWNTIME OF 20 HOURS MAS
CAUSED BY BREAKAGE OF BELT ON RECIRCULATION PUMP WHICH MAS THEN REPLACED.  SCHEDULED MAINTENANCE
REQUIRED AN ADDITIONAL HOUR OF DOWNTIME.

1ST QUARTER-1979    DURING THE REPORT PERIOD THE FGD SYSTEM OPERATED 1516.5 HOURS OF THE REQUIRED
1620.5 HOURS, YIELDING A 93.6* RELIABILITY.  IN DECEMBER, 197*, THE SYSTEM OPERATED 442 HOURS OUT OF
THE REQUIRED 451.5 HOURS, IN JANUARY, 490 HOURS OFTHE REQUIRED 536 HOURS, IN FEBRUARY, 446 HOURS OUT
OF 489 HOURS, AND UNTIL THE REPORT PERIOD IN MARCH, 136.5 HOURS OUT OF 144 HOURS, YIELDING
RELIABILITY VALUES OF 97.9*, 91.4*, 91.2X, AND 96.2X, RESPECTIVELY.  OF THE TOTAL DOWNTIME OF 104
HOURS, CLEANUP OF SPRAY NOZZLES REQUIRED 26.5 HOURS AND LIME REACTOR TANK CLEANUP REQUIRED 6.5
HOURS.
    IN JANUARY, RECENTLY INSTALLED SPIRAL NOZZLES WITH SEVERE PLUGGING PROBLEMS WERE REPLACED 8V
•HIRL CHAMBER NOZZLES.  THE WHIRL CHAMBER NOZZLES ARE OPERATING SATISFACTORILY.  THESE REPLACEMENTS
CAUSED 12.5 HOURS DOWNTIME.  THE DOWNTIME HOURS CAUSED BY REPAIRS ON VACUUM FILTER, MELDING ON
SEPARATOR AND RECIRCULATION LINE WELDING WERE 25, 4.5, AND 11.5 RESPECTIVELY.  REPLACEMENT OF SOME
PARTS IN VALVE BODY OF THE VACUUM FILTER AND GAS LEAKAGE FROM FAN HOUSING CAUSED DOWNTIME OF 11.5
AND 4 HOURS RESPECTIVELY.
    DURING SHUTDOWN, INCOMPLETE CLOSURE OF DAMPERS ALLOWS A SMALL AMOUNT OF FLY ASH TO ENTER THE
SPRAT NOZZLES.  THE CONDENSATION IN THE PIPING AND NOZZLES DURING SHUTDOWN ADDS TO THE PLUGGING
PROBLEM.  HENCE, EVERY MAJOR SHUTDOWN OF SCRUBBING SYSTEM IS FOLLOWED BY CLEANUP OF SPRAY NOZZLES.
                                                 62

-------
                                                                              STATUS  TO  APRIL   1979

                                       SECTION   9  (CONTINUED)

             PERFORMANCE  DESCRIPTION  FUR  OPERATIONAL FGD  SYSTEMS  ON  INDUSTRIAL BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHAKACtbKISTJ.es

  SOUHCE HATING

  NUMBER OF SEPARATE FliO  UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOUHCE CAPACITY




  CONTROL SYSTEM VEUUOK

  CONTROL PROCESS

  NEH / RETROFIT

  START-OP OATE

  CONTROL SYSTEM STATOS

  S02 REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  MATER MAKE-OP

  SLOOSE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
FMC CSOOA ASri PLANT)

GREEN RIVER. WYOMING

COAL (IX SULFUR)

UMbiOOO SCFM (TOTAL - 2 BOILERS)

 2

 Z

223 MN (EQUIVALENT)J  TOTAL - Z BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE,  2000 SCFM * 1  EQUIVALENT MN,
THIS IS BECAUSE GAS FLO* RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

FMC ENVIRONMENTAL EQUIPMENT

SODIUM CARBONATE SCRUBBING

NEH

MAY, 197b

OPERATIONAL

95X 1800 PPM AT INLET)

REMOVED BY PRECEDING ESP (99.sx)

OPEN LOOP: L/G s 15-20 GAL/1000 ACF

HOLOING POND FOR EVAPORATION

NA2S03/S04 LIQUOR DISPOSED TO COLLECTION POND - NO PRIOR

AERATION.  LANDFILL IN THE FUTURE

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND  INFORMATION

    FMC CHEMICAL CORP. HAS A SODA ASH  PLANT  IN  GREEN  RIVER*  WYOMING.   THE  PLANT HAS  TWO COAL-FIRED

POWER BOILERS WHICH BURN 1.0 PERCENT SULFUR  COAL.   THE  FLUE  GAS FHOM  EACH  BOILER  (330,000 ACFM AT

380 F) IS TREATED HY A HOTS1DE fcSP  MTH 2B8  PLATES  AND  A  PARTICULATE  REMOVAL EFFICIENCY OF 99.5 X.

    THE FLUE GASES ARE SCRUBBED BY  THE  PLANT ENO-LIUUOR IN TWO 5CKUB8ERS,  EACH WITH  THREE PAIRS OF

DISC-ANU-DONUT TRAYS.  THE SCRUBBERS AND THE DISCS  ARE  LINED WITH  CEILCOTE  103 WHEREAS THE DONUT

PARTS OF THE TRAYS ARE MADE FROM  INCONEL 825.   THE  SCRUBBER  LIQUOR IS MAINTAINED  AT  A PH OF 6.5 AND

IS RECIRCULATEO AT A RATE OF IS - 20 GALLONS/1000  ACF OF  FLUE GAS. A PART  OF THE RECIRCULATING

LIQUOR IS CONTINUOUSLY PURGED TO  REMOVE SULFITES AND  SULFATES FORMED  BY THE REACTION OF 302 WITH

SODA ASH.  THE RECIRCULATING PUMPS  AND  THE RELATED  PIPING IS RUBBER LINED.  A MESH-TYPE DEMISTER IS

USED IN EACH SCRUBBER.  THE GASES ARE  REHEATED  BY  DIRECT  FIRING OF NATURAL  GAS AT THE EXIT OF THE

SCRUBBERS.  THE REHEATED FLUE GAS IS MIXED WITH BYPASSED  GAS BEFORE GOING TO THE  STACK AT ABOUT

180 F.  DAMPERS WITH REMOTE CONTROLS KECiULATE THE FLOW  OF OFFGAS THROUGH AND AROUND  THE SCRUBBERS.

APPROXIMATELY SOX OF THE TOTAL FLUE GAS IS RUN  THROUGH  THE SCRUBBERS.

    AUTOMATIC CONTROLS MAINTAIN SOLUTION LEVEL  IN THE SCRUBBER BASIN.  THE  PRIMARY SOURCE OF WATER

MAKE-UP IS PROCESS WASTtWATER WHICH IS  CHANNELED TO A MAKE-UP TANK.   IF MORE MAKE-UP IS REQUIRED,
                                                63

-------
                                                                             STATUS TO APRIL  1979

                                      SECTION  9  (CONTINUED)

             PERFORMANCE DESCRIPTION FOK OPERATIONAL F6D SYSTEMS ON INDUSTRIAL BOILERS

FMC (SODA ASH PLANT); GREEN RIVER* WYOMING  (CONTINUED)


RIVER MATER IS TAPPED.  THE SCRUBBER BLEED  STREAM IS DISCHARGED TO A WASTE POND AT A RATE OF ZOO-250

6PM AT THE SITE.

    REFER TO FIGURE 14-11 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.



                                         OPERATING HISTORY

3RD OUARTER-1977    SOME PROBLEMS OCCURRED  WITH THE SCRUBBER LINING AS A RESULT OF FAULTY

INSTALLATION.  THE POSSIBILITY OF RUNNING THE SYSTEM WITH NO REHEAT NAS BEING INVESTIGATED.


4TH 8UARTER-1977    THE SCRUBBERS CORRODED  AS A RESULT OF FAULTY INSTALLATION OF THE LINING.

TNE IMPURITIES IN THE SCRUBBING LIOUOR CAUSE FOAMING AND SEDIMENTATION ON THE TRAYS.


1ST OUARTER-1978    PIPELINE FREEZUPS, AND  LEAKS FROM THE VANE DAMPERS MERE THE MAIN PROBLEM AREAS.


2ND OUARTER-1978    THE DEMISTER WAS PLUGGED, AND THE RECIRCULATION PUMP MAS DOHN FOR SOME PERIOD.

PH CONTROL IS NOT VERY EFFECTIVE, CAUSING PH EXCURSIONS TO ABOUT 3.0.  THIS HAS CAUSED SCALING IN

THE PIPELINES AND IN THE TOWER.  FMC TESTS  HAVE MEASURED 302 REMOVAL EFFICIENCY IN THE RANGE OF 87X-

94*' DEPENDING ON L/G AND PH.



SRD OUARTER-1978    TWO ANNUAL SCHEDULED OUTAGES OCCURRED DURING THIS PERIOD.  ONE LASTED 2 WEEKS

IN AUGUST WHILE THE OTHER LASTED 1 WEEK IN SEPTEMBER.  MAINTENANCE ON THE FGD SYSTEM DURING THESE

OUTAGES INCLUDED CLEANING OF THE SYSTEM AND FREEING OF THE DAMPER.  THE DAMPERS HAD A PROBLEM

OPERATING PROPERLY DURING COLD WEATHER.  IT WAS DETERMINED THAT THE PUMP OUTAGE DURING THE 2ND

QUARTER WAS CAUSED BY A BROKEN SHAFT.  THE SHAFT NAS REPLACED.



4TH UUARTER-1978    DURING THE REPORT PERIOD, NO MAJOR OPERATING PROBLEMS OCCURRED.  ORIGINAL LINING

WAS REINSTALLED ON THE RECIRCULATION PUMP WHILE USING A SPARE PUMP.  THE BEARINGS OF THE SHAFT ON

THE LOUVER DAMPER WERE ADJUSTED FOR FREE OPERATION OF THE DAMPERS.  NO SCALING PROBLEMS HAVE BEEN

REPORTED.  THE RELIABILITY VALUE OF THE FGD SYSTEM WAS CLOSE TO 100X.



1ST QUARTER-1979    DURING THE REPORT PERIOD, NO MAJOR OPERATING PROBLEMS OCCURRED.  THE PLANT

REPORTED THE FOLLOWING OPERATING HOURS FOR THE PERIOD!
                                         BOILER                            BOILER

    MONTH           FGD              CAPACITY FACTOR       FGD         CAPACITY FACTOR

                  UNIT 1              (S MAX. LOAD)        UNIT 2        (X MAX. LOAD)

  DEC. 1978       714.0                   82.2            637.0             79.3

  JAN. 1979       742.5                   62.7            691.              80.3

  FEB. 1979       6*7.0                   73.1            646.0             88.0

    THE RELIABILITY VALUE OF THE FGD SYSTEM HAS CLOSE TO 100X.

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION  9  (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS UN INDUSTRIAL BOILERS
  INSTALLATION NAME
  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING
  NUMBER OF SEPARATE FKU UNITS

  NUMBER UF BOILERS BEIN6 CONTROLLED
  SOURCE CAPACITY



  CONTROL SYSTEM VENDOR

  CONTROL PROCESS
  NEW / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  S02 REMOVAL EFFICIENT
  PARTICIPATE REMOVAL EFFICIENCY

  MATER MAKE-UP
  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
GENERAL MOTORS CORPORATION
DAYTON, OHIO

COAL10.7X - 3. OX SULFUR)

36,000 SCFM (TOTAL • 2 BOILERS)
34,000 ACFM ol bOOF, FOR EACH UF TWO BOILERS.
120,000 LB/HR STEAM (TOTAL)
16 M* (EQUIVALENT); TOTAL - 2 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EQUIVALENT MW.
THIS IS BECAUSE GAS FLOW RA1E IS THE PRIMARY FACTOR IN MODULE SIZING.)

ENTULETER, INC.

SODIUM HYDROXIDE SCRUBBING
RETROFIT

SEPTEMBER, 197«

OPERATIONAL
8bX (1.43 LB/MM BTU o) INLET)
97. bX (0.107 LB/MM bTU d OUTLET)

50 GPM

WASTENATEH TREATMENT AND DISCHARGE TO CITY :SEWER
NA2S03/S04 LIQUOR AT 35 GPM TO ON-SITE CLARIFICATION AND

DEWATERING FACILITY

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMAIION
                                       BACKGROUND  INFORMATION

    IN DAYTON, OHIO, GENERAL MOTORS OPERATES A FACTORY WHICH MANUFACTURES BRAKES AND OTHER PARTS

FOR THEIR AUTOMOBILES.  THE PLANT HAS TWO STOKER-FEED, COAL-FIRED BOILERS WHICH MERE INSTALLED IN
1954 BY BABCOCK AND WlLCOX.  EACH BOILER IS RATED  AT 60,000 LB/HH STEAM, AND BURNS A MAXIMUM OF 3

TONS OF COAL PER HOUR.  THE BOILERS ARE EQUIPPED NITH  INTERNAL MULUCLONES FOR PRIMARY PARTICULATE

CONTROL.  THE STEAM GENERATED BY THESE BOILERS IS  USED FOR BUILDING HEAT AND PROCESS NEEDS.  ONE
BOILER IS OPERATED CONTINUOUSLY THROUGHOUT THE YEAR AND THE OTHER IS OPERATED APPROXIMATELY 6 MONTHS

PER YEAR.  THE MAJORITY OF THE TIME (8 - 10 MONTHS/YR) ONLY ONE BOILER IS IN SERVICE.
    THE EMISSION CONTROL SYSTEM WAS DESIGNED TO CONTROL BOTH FLYA3H AND 302, AND HAS SUPPLIED AS A
RETROFIT APPLICATION BY ENTOLETER, INC. IN SEPTEMBER 1974.  EACH BOILER IS FOLLOWED BY A BOILER I.D.
FAN, A PLENUM, AND A SCRUBBER F.O. FAN.  THE PLENUM CAN FUNCTION IN ONE OF THREE MAYS: IT CAN FEED

FLUE CASES TO THE SCRUBBER MODULE; IT CAN BYPASS THE GASES TO THE ATMOSPHERE IN CASE OF A SCRUBBER
MALFUNCTION? OR IT CAN MIX AMBIENT AIR MITH THE FLUE GASES IN CASE OF LOW LOAD IN ORDER TO MAINTAIN

CONSTANT AIR FLOW TO THE SCRUBBER FAN.
                                                65

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL F6D SYSTEMS ON INDUSTRIAL BOILERS



6ENERAL MOTORS CORPORATION! DAYTON, OHIO (CONTINUED)





    THE SCRUBBER CONSISTS OF THE ENTOLETEK "VANE-CAGE" (5 FT. DlA. X 5 FT. HIGH) WHICH IS HOUSED IN



A CONICAL BOTTOM SECTION (6 FT. DIA. X 5 FT. HIGH), AN INTERMEDIATE SECTION (6 FT. DIA. X



5 FT. HISH), AND A DISENGAGEMENT ZONE (10 FT. DIA. X 12 FT. HIGH).  THE FLUE GAS (34,000 ACFM



9 SOOF) ENTERS THE BOTTOM SECTION TANGENTIALLY.  RECIRCULATING LIQUOR IS SPRAYED FROM THE TOP OF



THE VANE CAGE SECTION, WHICH CAN BE MOVED VERTICALLY TO VARY THE PRESSURE DROP ACROSS THE SCRUBBER.



A PRIMARY DEMISTER IS LOCATED ABOVE THE PREVIOUSLY MENTIONED INTERMEDIATE SECTION AND A SECONDARY



DEMISTER IS LOCATED ATOP THE DISENGAGEMENT ZONE.  THE GAS THEN PASSES THROUGH A STUB STACK TO THE



ATMOSPHERE.  SCRUBBING LIQUOR IMPINGES ON THE BOTTOM OF THE VANE CAGE AND A SPRAY CHAMBER EFFECT



PROVIDES THE 802 REMOVAL.  SCRUBBER UNDERFLOW, CONTAINING PARTICULATE AND A NA2803/S04 SOLUTION IS



SENT TO THE RECYCLE TANK, WHERE MAKEUP wAIER AT A  RATE OF SO 6PM IS ADDED.  RECYCLE PUMPS TAKE



LIQUOR FROM THE RECYCLE TANK TOP, ALONG NITH THE CAUSTIC STREAM ADDED AT A RATE OF 14 GALLONS



PER HOUR TO THE FEED LINE, AND RECIRCULATE IT TO THE TOP OF THE VANE CAGE AT A RATE OF ZOO GPM.



THE L/6 RATIO IS 6 GAL/1000 ACF, AND A TYPICAL PRESSURE DROP ACROSS THE SCRUBBER IS 7 IN. N6.  A



BLEED OFF FROM THE RECIRCULATION LINE (SO GPM) IS PURGED TO A WASTENATER TREATMENT FACILITY, WHICH



CLARIFIES ALL THE PLANT NASTE STREAMS, ADJUSTS THE PH (7-9), AND DISCHARGES TO CITY SEDERS.



    ABSORBER MODULES, DEMISTERS, STACKS, AND THE RECYCLE TANK ARE CONSTRUCTED OF 316L STAINLESS



STEEL.  THE SCRUBBER F.O. FANS, PLENUMS, CAUSTIC TANK, CAUSTIC PUMP, AND INLET DUCTWORK ARE ALL



CARBON STEEL.  THE RECIRCULATION PUMPS AND PIPING ARE RUBBER-LINED.



    THE TOTAL INSTALLED COST OF THE SYSTEM MAS 8668,000 IN 1974 DOLLARS.  THE AVERAGE OUTLET 802



CONCENTRATION IS 0.21 LB/MM B1U, NELL UNDER THE REGULATION OF 1.0 LB/MM BTU.  THE OUTLET PARTICULATE



LOADING IS 0.107 LB/MM BTU AND THE REGULATION IS 0.177 LB/MM BTU.



    REFER TO FIGURE 14-12 IN SECTION 14 FOR A'DETAILEO PROCESS FLOW DIAGRAM OF THIS SYSTEM.







                                         OPERATING HISTORY



4TH OUARTER-1974    UPON START-UP, SEVERAL PROBLEMS MERE ENCOUNTERED.  PARTICULATE BUILDUP CAUSED



PLUGGING OF THE RECYCLE TANK CHAIN AND NASTE STREAM SUMP PUMPS.  AIR PURGE STREAMS WERE INSTALLED TO




ALLEVIATE THESE PROBLEMS.







1ST OUARTER-197S    THE DAMPERS AND DAMPER CONTROL SYSTEMS HERE MAJOR PROBLEMS.  THREE SETS OF



EXPANSION JOINTS HAD TO BE INSTALLED BEFORE ACHIEVING PROPER FLOW CONTROL.








2ND OUARTER-1975    A FAN BEAMING HAD TO BE REPLACED THREE TIMES.







3RD OUARTER-1975    INSTRUMENTATION AND CONTROL PROBLEMS PROMPTED MIRING REVISIONS.







4TM 8UARTER-1976    THE FGD SYSTEM DEMONSTRATED AN AVAILABILITY OF 93 PERCENT.
                                                66

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL F6D SYSTEMS ON INDUSTRIAL BOILERS
GENERAL MOTORS CORPORATION; DAYTON. OHIO (CONTINUED)


1ST UUARTtR-1977    THERE MERE MECHANICAL PROBLEMS WITH THE VANE CA6E DRIVE.  THE ACCESS DOOR
DEVELOPED LEAKS AND THE LIQUOR CORRODED THE OUTER SURFACE OF THE INLET DUCT AROUND THE ACCESS DOOR.

4TH QUARTER-1977    CORROSION AND PLUGGING PROBLEMS CONTINUED TO HAMPER SCRUBBER OPERATIONS.
HOWEVER, USUALLY MHEN A SCRUBBER IS DOWN, THE OTHER BOILER IS FIRED UP NHILE REPAIRS ARE MADE TO THE
DONNED UNIT.

1ST QUAHTER-1978    THE PRIMARY DEMISTER MAS SEVERELY CORRODED DUE TO ACID DROPPING DOWN ONTO IT
FROM THE UPPER DEMISTER.

2ND UUAKTER-1978    THE FOLLOWING SYSTEM MODIFICATIONS WERE BEING PLANNED! THE INTERMEDIATE SECTION
WILL BE REMOVED, THE PRIMARY OEMlSTEH WILL BE REPLACED BY A SIMILAR VANE-TYPE HASTELLOY-6 OEMI3TER,
THE SECONDARY DEMISTER WILL BE REPLACED BY A RADIAL VANE HASTELLOY-G DEMISTER. AND A CONVEX
IMPINGEMENT BAFFLE PLATE OF HASTELLOY-G HILL BE INSTALLED ABOVE THE PRIMARY DEMISTER TO ASSIST IN
RAPID DRAINAGE OF THE ACID DROPLETS.
3RD OUARTER-1976    THE MODIFICATIONS DESCRIBED IN THE 2ND QUARTER 1978 ARE STILL IN THE DESIGN PRO-
CESS.  WORK INCORPORATING THE MODIFICATIONS SHOULD BEGIN ABOUT THE END OP OCTOBER*
    THE SCRUBBER LINING OF COAL TAR EPOXY MAS ABRADED OFF AND A CARBOLENE LINER MAS INSTALLED.
THIS LINING HAS BEEN FLAKING OFF IN PLACES.
    THE PH PHUHE9 AND PH MONITORING SYSTEM AKE BEING REDESIGNED SINCE THE SYSTEM CURRENTLY IN USE
SEEMS TO bt CUNTINUALLY OUT UF CALIBRATION.  AN ULTRASONIC CLEANER WAS INSTALLED BUT IS NOT WORKING
WELL.  THE PH MONITORING SYSTEM IS A DUAL PRUBE SYSTEM WHICH ALLOWS A PROBE TO BE IN USE WHILE THE
OTHER IS CLEANED.

«TH gUAHTER-1976    DURING THE REPORT PERIOD THE SCRUBBERS MERE RECONSTRUCTED.  NEW HASTELLOY-6 MIST
ELIMINATORS WERE INSTALLED* AS DESCRIBED IN 2ND OUARTER-197*.  ttOKK IS SCHEDULED TO BEGIN ON
INSTRUMENTATION MODIFICATIONS ABOUT MID-JANUARY.  THESE INCLUDE REMOVAL OF THE FLUE GAS FLOW SENSORS
AND INSTALLATION UF A NEW PH MONITORING SYSTEM.  WORK "ILL BE DONE ON ONE MODULE AT A TIME, AND
ONLY 4S HOUKS UF MUTUAL DOWNTIME ANE EXPECTED FOR HOOK-UP.  THE PHENOL SCRUBBER LINING SUPPLIED BY
CARBOLINE HAS FLAKED OFF.  NO PLANS CURRENTLY EXIST TO RELINK THE SCRUBBERS.

1ST QUARTER-1979    THE INSTALLATION OF 1HE NEW HASTtLLOY-6 MIST ELIMINATORS HAS BEEN COMPLETED.
AN AVAILABILITY INDEX OF BOX WAS REPORTED FOR THE PERIOD.
                                                67

-------
                                                                              STATUS  TO  APRIL   1979
                                       SECTION   9  (CONTINUED)
              PERFORMANCE  DESCRIPTION  FOR  OPERATIONAL fSD  SYSTEMS  ON  INDUSTRIAL  BOILERS
   INSTALLATION  NAME
   INSTALLATION  LOCATION
   SOURCE CHARACTERISTICS
   SOURCE HATING

   NUMBER OF SfcPARATE FGD UNITS
   NUMBER OF BOILERS BtlNG CONTKULLEU
   SOURCE CAPACITY


   CONTROL SYSTEM VfcNUUR
   CONTROL PROCESS
   NEK / RETROFIT
   START-UP DATE
   CONTROL SYSTEM STATUS
   SO* REMOVAL Et-'FICItNCY
   PAHTICULATE REMOVAL EFFICIENCY

   MATER MAKE-UP
   SLUUSfc OR BY-PRUOUCT DISPOSAL

  CONTROL SYSTEM COST
GENERAL MOTORS CORPORATION
PARMA, OHIO
CUAL  12.5» SULFUR)
128,400 SCFM (TOTAL - 4 BOILERS)
320,000 Ltt/HH STEAM (TOTAL)
 1
 a
64 Mft (EQUIVALENT); TOTAL - 4 BOILERS
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLON RATE IS THE PRIMARY FACTOR IN MODULE SUING.)
GM ENVIRONMENTAL
DOUBLE ALKALI (DILUTE)
RETROFIT
MAHCH, 1974
OPERATIONAL
90X (800-1300 PPM * INLET)
six (AT INLET: UNITS i&2 - 1.75 LB/MIN; UNITS 3*4 - 1.22
L8/MIN)
CLOSED LOOP
OEWATERED SLURRY TO LANDFILL
SOfX SOLIDS (CAS03/SU4) SLUDGE TO DRYING POND AND LANDFILL
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
   THE CHEVROLET PARMA PLANT OF GENERAL MOTORS IS LOCATED NEAR CLEVELAND, OHIO.  THE PLANT HAS FOUR
SPREADER-STOKER BOILERS FIRED BY TRAVELING GRATES, CAPABLE OF PRODUCING A TOTAL OF 320,000 LB/HR OF
STEAM AND GENERATING 120,400 SCFM UP FLUE GAS, WHICH IS EQUIVALENT TO ABOUT 64 MM OF ELECTRICAL CAP-
ACITY.  THE COAL FIRED IN THESE UNITS ORIGINATES PRIMARILY FROM THE SOUTHEASTERN PORTION OF OHIO AND
HAS THE FOLLOWING AVERAGE CHARACHTERISTICSt HEAT CONTENT OF 11,300 BTU/LB,  SULFER CONTENT OF 1.7 TO
2.7 PERCENT, ASH CONTENT OF 6.0 TO 14.8 PERCENT, AND A TOTAL MOISTURE CONTENT OF 7.8 PERCENT.
    THE POWER BOILERS HAVE AN EMISSION CONTROL SYSTEM CONSISTING OF CYCLONE-TYPE MECHANICAL
COLLECTORS UPSTREAM OF A DILUTE DOUBLE ALKALI SCRUBBING SYSTEM.  THE FGD SYSTEM SCRUBBING MODULES
HERE SUPPLIED BY KOCH ENGINEERING.  INSTALLATION HAS COMPLETED ON FEBRUARY 26, 1974.  THE SYSTEM
CONSISTS OF FOUR SCRUBBERS OPERATING IN PARALLEL.  EACH SCRUBBER CONTAINS THREE BUBBLE-CAP
ABSORPTION TRAYS AND A MESH MIST ELIMINATOR.  THE FLUE GAS RATE IS 61,500 ACFM AT 393 F FOR EACH OF
THE FIRST TWO SCRUBBERS AND THE OUTLET TEMPERATURE IS 137 F.  THE INLET 302 CONCENTRATION IS 765
PPM.  THE FLUE GAS FLOW RATE IS 58,600 ACFM AT 550 F FOR THE OTHER TWO SCRUBBERS AND THE OUTLET
TEMPERATURE IS 152 F.  THE INLET S02 CONCENTRATION IS 800-1300  PPM.  OUTLET CONCENTRATION VARIES
                                                68

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS



GENERAL MOTORS CORPORATION; PARMA, OHIO (CONTINUED)





FROM 136-220 PPM FOR THE SCRUBBERS.



    THE SULFUR DIOXIDE CONTAINED IN THE BOILER FLUE GAS IS ABSORBED BY A REGENERATED CAUSTIC



SOLUTION (0.1 MOLAR NAOH), FORMING A SOLUTION OF SOLUBLE SODIUM SALTS.  THE SPENT CAUSTIC IS THEN



REGENERATED BY REACTING THE SODIUM SALT SOLUTION WITH SLAKED LIME, RESULTING IN THE FORMATION OF



CALCIUM SULFITE/SULFATE SOLIDS, WHICH ARE SEPARATED OUT OF THE SOLUTION.  NEXT, SODA ASH IS



ADDED TO THE SOLUTION IN ORDER TO MAKE UP FOR SODIUM LOSSES AND MINIMIZE THE SCALE POTENTIAL FROM



THE CALCIUM WHICH REMAINS IN SOLUTION.  THE REGENERATED CAUSTIC FORMED IS THEN RECYCLED BACK TO THE



SCRUBBER FOR ADDITIONAL SULFUR DIOXIDE REMOVAL.  THE CALCIUM SALT AND FLY ASH SLUDGE WHICH RESULTS



IS DEHATEREO AND HAULED ANAY BY THUCK TO AN OFF-SITE LANDFILL.





EQUIPMENT SPECIFICATIONS





SCRUBBERS.  EACH OF THE 4 SCRUBBERS IS 10.5 FT OIA X 22.5 FT HIGH X It GAUGE THICK AND CONTAINS 3



BUBBLE-CAP TRAYS.  ALL THE SCRUBBERS AND TRAYS ARE MADE OF 316L SS.  THE SCRUBBERS HAVE A TURNDOWN



RATIO OF 3 AND ALSO HAVE A BYPASS DUCT.  THE DESIGN L/G RATIO IS 20 GALLONS/ACF BUT THIS



MAY BE VARIED DURING OPERATION.  THE PRESSURE DROP ACROSS THE SCRUBBER RANGES BETWEEN 6-9 IN. HG.





DEMI8TERS.  ORIGINAL 316 SS MIST ELIMINATORS HERE CORRODED DUE TO CONDENSATION AND WERE REPLACED BY



FLEXIMESH-TYPE POLYPROPYLENE MIST ELIMINATORS.





RECYCLE TANKS/PUMPS.  ALL THE 4 RECYCLE TANKS ARE MILD STEEL WITH TAR TYPE RESIN COATING.  THE PUMPS



(6 TOTAL, 2 SPARE) ARE CENTRIFUGALS WITH MILD STEEL CASING AND HAVE RUBBER LININGS.  THE PUMP MOTORS



ARE 40 HP.





CHEMICAL MIX TANKS & AGITATORS.  BOTH THE MIX TANKS ARE MILD STEEL WITH 5000 GALLONS CAPACITY.  THE



DESIGN RESIDENCE TIME IS 7 MINUTES.  NEW AGITATORS ARE PROPELLER TYPE.  THESE ARE SPECIALLY DESIGNED



TO GIVE HIGHER FLOW RATE THROUGH THE BLADES.  THE DRIVE RATINGS ARE 5 HP AND 45 RPM.





CLARIFIERS.  BOTH THE CLARIFIEftS (60 FT OIA X 14 FT LIQUID DEPTH) HAVE A CONICAL BOTTOM AND 300,QUO



GALLONS CAPACITY.  THE DESIGN RETENTION TIME IS ABUUT 4 HOURS AT A FLOW RATE OF 1200 GPM.








VACUUM FILTERS.  BOTH THE VACUUM FILTERS HAVE 500 SQ. FT. OF SURFACE AREA WITH A 10 FT URUM DIA-



METER.  THE DRUM DRIVE SPEED IS 0.5 RPM MAXIMUM.





FILTRATE TANK/PUMPS.  THE TANK (4 FT OIA X 7 FT HIGH) IS MILD STEEL AND HOLDS 660 GALLONS OF



FILTRATE.  THE PUMPS ARE MILD STEEL  CENTRIFUGAL AND HAVE A CAPACITY OF 300 GPM AT IS FT. OF HEAD.





EARLY PROBLEMS AND SOLUTIONS



     THE SYSTEM MAS STARTED UP ON FEBRUARY 28, 1974 AND BY APRIL 31, IT HAD OPERATED FOR 264 HOURS.



THERE WERE TWO SCHEDULED SHUTDOWNS DURING THIS PERIOD FOR EQUIPMENT INSPECTION.  THE SECOND SHUTDOWN
                                                69

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9  (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FSD SYSTEMS ON INDUSTRIAL BOILERS



6ENERAL MOTORS CORPORATION! PARMA. OHIO (CONTINUED)





REVEALED THAT SOLIDS MERE NOT BEING DISCHARGED FROM THE PRIMARY CLARIFIER RAPIDLY ENOUGH.



AS A RESULT, THE CLARIFIER RAKE JAMMED.  A PIPING CHANGE HAS MADE TO BLEND THE CAUSTIC FEED



IN KITH THE RECYCLE LIQUOR.  THIS IMPROVED PERFORMANCE BUT DID NOT COMPLETELY ELIMINATE



THE PROBLEM.  PREMATURE CAKE CRACKING IN THE VACUUM FILTERS REQUIRED THE PRESENCE OF AN OPERATOR



DURING OPERATION.  CAKE MASHING TO REDUCE LOSSES NAS NOT INITIALLY SUCCESSFUL BECAUSE THE SPRAY



NATER TENDED TU KNOCK THE CAKE OFF THE DRUM.  ALTERATIONS IN SPRAY PATTERN AND OTHER MEASURES



APPARENTLY SOLVED THIS PROBLEM.  THERE NAS NO EVIDENCE OF COKROSION OR ABRASION IN THE PUMPS



OR PIPING.



    THE SYSTEM NAS SHUT OOHN FROM MAY 1 TO MAY 26, 197«, BECAUSE OF UNEXPECTED BUILDUP OF SOLIDS IN



THE CLARIFIER, NITH SUBSEQUENT OVERFLON INTO THE SCRUBBER.  THE PROBLEM NAS SOLVED BY 1| USING



* POLYMERIC FLOCCULATION AGENT TO ATTAIN BETTER SETTLING AND 2f WITHDRAWING SLUDGE FROM THE



CLARIFIER AT MORE FREQUENT INTERVALS.  SYSTEM AVAILABILITY TO THE BOILER NAS 67 PERCENT IN APRIL



1974, LESS THAN 10 PERCENT IN MAY, AND 100 PERCENT IN JUNE, JULY, AND AUGUST AFTER THE SYSTEM NAS



RESTARTED.  PLUGGING BY GYPSUM DEPOSITS IN THE OVERFLON LINE BETWEEN THE CLARIFIER8 AND IN THE



LINE FROM CLARIFIER NO. Z TO THE MIX TANKS NAS CORRECTED BY RELOCATING A CHEMICAL FEED LINE AND



REPLACING SOME PIPING.  THE SYSTEM NAS OONN THROUGH JULY AND AUG. 1975 FOR REPLACEMENT OF GRAVITY



PLOW LINES NITH AN OPEN FLUME THAT CAN BE EASILY CLEANED.  THE OPERABILITY INDEX FOR THE FSD SYSTEM



INCREASED SIGNIFICANTLY THROUGHOUT THE COURSE OF 197*.



    REPER TO FIGURE 14-13 IN SECTION 14 FOR A DETAILED PROCESS FLON DIAGRAM OF THIS SYSTEM.







                                         OPERATING HISTORY



        OPERATION HOURS



MONTH   BOILER  FGO SYSTEM  OPERABILITY (»)



MAY-JUN. 75



THE SYSTEM NAS RESTARTED AND PARTICULATE TESTS NEHE CONDUCTEU IN MAY.  THE SYSTEM NAS SHUT DONN DUE



TO PLUGGED CHEMICAL FEED LINE TO THE CLARIFIED AFTER RESTART.  AROUND JUNE to, THE SYSTEM MAS



SHUTDOWN BECAUSE OF SIMILAR PLUGGING IN ANOTHER PART OT THE LINE.  THE UNIT RAN FOR ABOUT TWO WEEKS



IN JUNE.



JUL.-AUG. 75



THE PSD SYSTEM NAS DOWN IN JULY AND AUGUST FOR REPLACEMENT OF GRAVITY FLOW LINE WITH AN OPEN FLUME.



OCT. 75   2131     184S         79



THE PSD SYSTEM RESTARTED ON SEPTEMBER 6, AND OPERATED DURING THIS PERIOD AT AM AVAILABILITY FACTOR



OP SO PERCENT.  THE FIGURES GIVEN FOR OCTOBER REPRESENT THE OPERATION HOURS FROM SEPTEMBER S TO



NOVEMBER 9.



DEC. 79   8135     1250          59



HOLIDAY SHUTDOWN FROM 18/23 TO 1/4.  DUE TO PROBLEMS NITH SOLIDS AND SOLIDS CARRY-OVER, G.M. CON*
                                                70

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL F60 SYSTEMS ON INDUSTRIAL BOILERS
6ENERAL MOTORS CORPORATION! PARMA, OHIO (CONTINUED)

        OPERATION HOURS
MONTH   BOILER  F6D SYSTEM  OPEHABILITY (X)
DUCTED STREAM TESTS DURING DECEMBER TO DETERMINE WHETHER THE CARRY-OVER OF SOLIDS NAS DUE TO A HIGH
SOLIDS KECIRCULATION RATE.  THE FGD SYSTEM NAS DOWN MOST OF DECEMBER BECAUSE OP THESE TESTS, NHICH
CAUSED THE LOM OPERABILITY FACTOR.
FEB. 76   2997     1196          40
G.M. HAS FOUND SOLIDS CONCENTRATION IN THE CLARIFIER TOO HIGH FOR EFFICIENT SYSTEM OPERATION.  A.D.
LITTLE NAS SCHEDULED TO CONDUCT TESTS ON THE SYSTEM IN APRIL AS PART OF AN EPA EVALUATION PROGRAM.
MAR. 76   1379      240           7
APR. 76   1064      647          76
THE LOM OPERABILITY INDEX DURING THE MONTH OF MARCH RESULTED FROM EXTENSIVE MODIFICATIONS PERFORMED
ON THE SYSTEM BY G.M. DURING THIS PERIOD THE SCRUBBER BLONOOMN AND SCRUBBER FLOW INDICATION SYSTEM
MAS REVISED.  FROM APRIL 19 TO THE END UF THE MUNTH THE SYSTEM MAS OPERABLE 100X.  DURING THIS
PERIOD ALL SYSTEM MODIFICATIONS HERE COMPLETED AND ALL MAJOR PROBLEM AREAS CORRECTED.
MAY  76   1149     1042          91
JUN. 76    924      616          66
ONE SYSTEM UPSET OCCURRED DURING THE PERIOD DUE TO AN OPERATOR ERROR.  BOILER HOURS MERE LOM IN JUNE
BECAUSE OF LOM PROCESS DEMAND.  THE SCRUBBING SYSTEM CHARACTERIZATION STUDY MAS CONCLUDED ON MAY 14.
JUL. 76    599      599         100
AUG. 76    715      715         100
THE BOILER LOAD DEMAND NAS VERY LIGHT DURING THE REPORT MONTHS, REQUIRING ONLY ONE BOILER BEING
CONTINUOUSLY ON LINE.  THE SYSTEM MAS DOMN FOR A ONE-MEEK PERIOD BECAUSE OF THE ANNUAL PLANT
INVENTORY.  MODIFICATIONS tU THE OPERATION OF THE OF THE GAS SCRUBBING SYSTEM HAVE INCLUDED!
     ELIMINATION OF POLYMERIC ADDITION.
     ELIMINATION UF SLUDGE BLANKET FOR FILTRATION.
     HIGH PERCENT SULFATE CONCENTRATION IN THE FILTER CAKE.
     INCORPORATION UF PH CONTROLLER IN THE CHEMICAL MIX TANK REGULATING THE LIME FEED INTO SYSTEM.
     PH CONTROL SHOULD REDUCE THE STOICHIUMETRIC REQUIREMENTS FROM THE 1.25-1.50 RANGE OOMN TO
     i.io-i.eo.
SEP. 76    809      223          40
OCT. 76   1174      734          63
TMO BOILERS AND THEIK CORRESPONDING SCRUBBER MODULES MERE IN SERVICE DURING THE MONTH.  OPERATION
TIME MAS LODGED PRIMARILY IN THE INITIAL PART OF THE MONTH.  A NUMBER OF PROBLEMS MERE ENCOUNTERED,
FORCING A SHUTDOWN THROUGHOUT THE REMAINDER OF THE MONTH.  THESE INCLUDED!
     SOLIDS DEPOSITION AND PLUGGING OF THE. CHEMICAL TANKS AND REACTORS* REQUIRING 8HUTDOMN/CLEANOUT.
                                                71

-------
                                                                             STATUS TO APRIL  1979




                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS




GENERAL MOTORS CORPORATION; PARMA, OHIO (CONTINUED)






        OPERATION HOURS



MONTH   BOILER  FGD SYSTEM  OPERABILITY (X)




     REPLACEMENT OF DEMISTER PADS.




     AGITATOR PROBLEMS.




THE SYSTEM HAS RETURNED TO SERVICE THE SECOND WEEK IN OCTOBER.  TMU BOILERS AND THEIR CORRESPONDING



SCRUBBERS MERE PUT BACK IN THE GAS STREAM.  PROBLEMS ENCOUNTERED STEMMED PRIMARILY FROM A MECHANICAL




COLLECTOR MALFUNCTIONING RESULTING IN EXCESSIVE PARTICULATE LOADING IN THE MODULES AND EVENTUALLY



CAUSING WIDESPREAD PLUGGING OF THE LOWER BUBBLE-CAP TRAYS.  SHUTDOWN AND CLEANOUT OF MODULES PLUS




REPAIRS TO THE MECHANICAL COLLECTOR WERE REQUIRED.  SYSTEM RESTART OCCURRED NOVEMBER 6.




MAJOR MODIFICATIONS PERFORMED TO THE DOUBLE ALKALI SYSTEM DURING THE PERIOD INCLUDED THE INSTAL-



LATION OF A GREAT LAKES PH MONITOR AND CONTROL UNIT FOR THE REGULATION OF LIME FEED TO THE REGEN-




ERATION REACTOR-CLARIFIES UNIT.  THIS UNIT EMPLOYS A DIGITAL READOUT AND MAS SCHEDULED FOR OPERATION




SOMETIME IN NOVEMBER.  SUPERIOR CRYSTAL GROWTH OF THE CALCIUM SULFITE/SULFATE SALTS RESULTED BY




RUNNING A SEEDING LINE BACK TO THE REACTOR-CLARIFIES UNIT.




NOV. 76   1321      787          60




DEC. 76   1559      349          22



DURING THE LATTER PART OF NOVEMBER AND EARLY DECEMBER, THE SCRUBBERS WERE TAKEN OUT OF THE FLUE GAS




PATH BECAUSE OF CONTINUED SOLIDS BUILDUP IN THE MIX TANK.  IN ADDITION, SOME PIPING ARRANGEMENTS




MERE MODIFIED AND THE GEAR REDUCER IN THE MIX TANK HAD TO BE REPLACED.  THE FGD FIGURES REPORTED FOR




THE MONTH OF DECEMBER ARE NOT FULLY REPRESENTATIVE BECAUSE IT IS PART OF THE LOCAL UAN CONTRACT THAT




ONLY UAN PERSONNEL CAN OPERATE THE FGD SYSTEM AND THEREFORE THE SCRUBBERS COULD NOT BE OPERATED.




JAN. 77   1652      608          33




FEB. 77   1462      892          61



THERE WAS A FAILURE OF THE AGITATORS AT THE MIX TANKS.  THEY WERE LATER REPLACED WITH NEW ONES.




THE PLANT NAS SHUTDOWN FOR SOME PERIOD DUE TO CUTBACK OF NATURAL GAS SUPPLY AND REQUEST TO CURTAIL




ELECTRICAL CONSUMPTION.



APR. 77   1300     1158          89




MAY  77   1222     1118          92



BOILER HOURS WERE LOW DUE TO REDUCED SUMMER REQUIREMENTS.




JUN. 77   1180     111/3          94




JUL. 77    702      276          39



THE FGD SYSTEM GAVE A VERY HIGH UPERABILI1Y FOR JUNE.  THE FGD SYSTEM WAS DOWN FOR A CONSIDERABLE




PORTION OF JULY.  THE CHEMICAL MIX TANK BLEED OFF LINES AND OTHER PIPING HAD TO BE CLEANED OF




SEDIMENTED SOLIU3.



AUG. 77    755      67tt          90




SEP. 77    764      480          71
                                                72

-------
                                                                             STATUS TO APRIL  1979




                                      SECTION  9 (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS




GENERAL MOTORS CORPORATION; PARMA, OHIO (CONTINUED)






        OPERATION HOURS




MONTH   BOILER  FGD SYSTEM  OPERABILITY (X)




DURING THIS LOW-LOAD PERIOD THE LIME FEED PUMP AND LIME FEED LINES MERE CLEANED.  GENERALLY* EVERY




SUMMER AN ANNUAL FGD OVERHAUL IS CARRIED OUT.




OCT. 77   1277      398          31




NOV. 77   1380      920          67




DEC. 77   1790      968          54




THE CHEMICAL MIX TANK AGITATORS HERE TOTALLY REDESIGNED AND REPLACED BY HIGH-CARSON STEELi PROPELLER



TYPES.  THE BLADES WERE SPECIFICALLY DESIGNED TO INCREASE THE FLOW THROUGH THE PROPELLERS, THUS




INCREASING THE INTENSITY OF MIXING.  DUE TO THANKSGIVING HOLIDAYS IN NOVEMBER AND CHRISTMAS AND NEW




YEAR HOLIDAYS IN DECEMBER, THE FGO SYSTEM HAD LOWER OPERATION HOURS.  SOME OF THE BOILERS HAD TO BE




RUN FOR BUILDING MAINTENANCE.






1ST QUARTER-1978    THE BOILERS OPERATED FOR 3370 HOURS NHEREAS THE FGO OPERATED FOR 70 HOURS.




THE OPERABILITY INDEX MAS THEREFORE 1.25X.  THE RAKE SHAFT  IN THE THICKENER WAS BROKEN IN EARLY




JANUARY.  THERE WAS A CONSIDERABLE DELAY IN RECEIVING REPLACEMENT PARTS.  IN ADDITION, SEVERE WINTER




(BLIZZARD, HEAVY SNOw) MADE IT IMPOSSIBLE TO PERFORM ANY REPAIRS.






2ND OUARTER-1978    THE FGD SYSTEM OPERATED FOR 2669 HOURS, AND THE BOILERS OPERATED FOR 3414 HOURS.




THE OVERALL OPERABILITY WAS 78.2 PERCENT.  IN APRIL, THE PIPELINES WERE FLUSHED ANO CHEMICAL TANKS




MERE CLEANED ALONG KITH SCRUBBER INTERNALS, STACKS ANO MIST ELIMINATORS.  IN JUNE, THE AVAILABILITY




HAS 109 PERCENT.  DURING THE SUMMER QUARTER, USUALLY A LOW-LOAD PERIOD, SEVERAL MODIFICATIONS WERE




SCHEDULED*  NEW VACUUM PUMPS AND FILTERS WILL BE INSTALLED, AND THE LIME SLURRY FEED PUMPS



MILL BE REPLACED BY DIAPHRAGM PUMPS TO AVOID PLUGGING OF CONTROL VALVES. THE NEW FILTER CLOTH, MADE




OF POLYPROPYLENE, HAS GIVEN MUCH LONGER FILTERING LIFE (ABOUT 3 MONTHS) THAN THE OLD ONE, MADE OF




NYLON.  THIS IS DUE TO THE POOR FILTERING CHARACTERISTICS OF THE NYLON (PLUGGING).








3RD QUARTER-1978    FOR THIS PERIOD THERE HAS BEEN NO DOWNTIME DUE TO EQUIPMENT OR PROCESS FAILURE.




WARREN-RUPP DIAPHRAGM PUMPS WERE INSTALLED TO REPLACE THE EXISTING LIME SLURRY FEED PUMPS.  THE




PLANT REPORTED 100X OPEMABILITY.








4TH QUARTER-197B    DURING OCTOBER AND NOVEMBER THE BOILERS OPERATED 2815 HOURS AND THE FGD SYSTEM




OPERATED 670 HOURS FOR AN UPERABILITY OF 23.8X.  NEW FRP STACKS (4.5 FT. DIA. X 38 FT. HIGH) WERE




MOUNTED ON TOP OF THE ABSORBERS, REPLACING THE OLD STAINLESS STEEL-LINED ONES WHICH WERE BADLY




CORRODED.  MODIFICATIONS WERE MADE TO THE TOP OF THE SCRUBBERS.  THESE INCLUDED ENLARGING THE




OPENING TO THE STACK TO REDUCE THE GAS VELOCITY, ANO REPLACING THE FLEXIME3H MIST ELIMINATOR WITH A




POLYPROPYLENE CHEVRON DEMISTER.  DURING THE RECONSTRUCTION, HATERLINES WERE TESTED IN PREPARATION
                                                73

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL PGD SYSTEMS ON INDUSTRIAL BOILERS
GENERAL MOTORS CORPORATION! PARMA, OHIO (CONTINUED)

FOR MINTER AND THE NEM VACUUM FILTER PUMPS WERE INSTALLED.  PEAK BOILER LOADS FOR THIS WINTER ARE
EXPECTED TO BE ABOUT 175,000 LBS/HOUR NITH 3 BOILERS OPERATING SIMULTANEOUSLY.

1ST OUARTER-1979    DURING THE PERIOD OF DECEMBER, JANUARY, AND FEBRUARY, THE BOILERS OPERATED A
TOTAL OF 624Z HOURS, AND THE SCRUBBERS 2436 HOURS.  THE OPERABILITY INDEX HAS THEREFORE 391.
CHEMICAL BALANCE PROBLEMS MERE ENCOUNTERED IN DECEMBER AND CONTINUED THROUGH MOST OF THE PERIOD.
HI6H PH CAUSED PLUGGING IN THE TOP THAT.  THE PH PROBES USED FOR CONTROLLING CHEMICAL FEED HERE
RELOCATED.  HIGH EXCESS AIR AND CHANGES IN THE L/G RATIO ARE BELIEVED TO BE THE CAUSE.  THE LIQUOR
IN THE BOTTOM TRAY IS BEING ACIDIFIED NHILE THE TUP TRAY IS NOT.  NORMAL PH CHANGE (TOP TRAY TO
BOTTOM TRAY) IS IN THE 1-2 RANGE.  CHANGES IN PH OF 3*4 UNITS ARE BEING NOTED, HITH A LOWER-THAN-
NORMAL PH IN THE BOTTOM TRAY ANO A HIGHER»THAN»NORMAL PH IN THE TOP TRAY.
                                                74

-------
                                                                              STATUS  TO  APRIL   1979

                                       SECTION   9  (CONTINUED)

             PERFORMANCE DESCRIPTION FOK OPERATIONAL  FGD  SYSTEMS ON  INDUSTRIAL  OUILEKS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS



  SOURCE RATING



  NUMBER OF SEPARATE FGD UNITS

  NUMBER OF BOILERS btING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEM / RETROFIT

  START-UP DATE



  CONTROL SYSTEM STATUS

  302 REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  MATER MAKE-UP

  SLUDGE OR BY-PRODUCT DISPOSAL



  CONTROL SYSTEM COST
GENERAL MOTORS CORPORATION

PUNT1AC* MICHIGAN

COAL (0.64k SULFuM)

ALSO HOOD. PAPER, AND CARU80ARD.

107,300 SCFM (TOTAL - 2 BOILERS)

350,000 LB/HR STEAM (TOTAL - 2 BOILERS)

 2

 2

S3 Ml* (EQUIVALENT)» TOTAL - 2 BOILERS

(FUR THIS REPURTi UNLESS 3TATEO OTHERWISE* 20UO SCFM • 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

GM ENVIRONMENTAL

SODIUM MYUHOXIDt SCRUBBING

NEW

APRIL* 1976

SYSTEM OPERATED 1*0 MONTHS IN EARLY (973.

OPERATIONAL

NOT DETERMINED

85X

OPEN LOOP I 90 GPM

OENATERED SLURRY TO LANDFILL

5X SOLIDS SLURRY OEWATERED ANO TO LANDFILL

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND  INFORMATION

    THE GENERAL MOTORS TRUCKS ANO  COACH PLANT  LOCATED  AT  PUNTIAC, MICHIGAN OPERATES  SEVERAL  BOILERS

TO GENERATE STEAM FOR BUILDING HEAT  AND PROCESS  REQUIREMENTS.   TWO OF  THESE BOILERS* N08.  6  ANO  8.

ARC SPREADER STOKERS AND FIRE A MIXTURE OF  COAL  (O.S4X SULFUR)  ANO SOLID  REFUSE  (PAPER  AND CARD-

BOARD) i  BOILER I»Q. b» INSTALLED  IN  1972 8V ERIE CITY* IS RATED AT 198 MM BTU/HH OR  150*000  LBS/MR

'OF 8TEAN*  BOILER NO. S* INSTALLED IN  1972  BY  RILEY.  IS RATED  AT  250 MM BTU/HR ORi200*000  L8S/HR

OP STEAM.  THE PARTICULATE EMISSIONS ARE CONTROLLED BY MECHANICAL COLLECTORS  SUPPLIED BY ZURN

INDUSTRIES* DESIGNED TO OPERATE AT 93*  EFFICIENCY* WITH A PRESSURE DROP OF ABOUT I IN.  NG.

    PEABOOY ENGINEERING SUPPLIED  i NET  SCRUBBERS IN APRIL 1976*  PRIMARILY FOR ADDITIONAL PARTICULATE

CONTROL.  EACH SCRUBBEKU2 FEET OIA  X  81.5  FEET  HIGH)  CONTAINS  3  IMPINGEMENT  1RAY8 AND  OPERATES

KITH AN L/C OF S GAL/10UO ACF.  THE  SCRUBBER EFFLUENT  IS  MIXED  WITH CAUSTIC AND MAKEUP  NATER IN  A

MOLD TANK* ANO PUMPED TO A CLARIFIER.   THE  OVERFLOW IS RECYCLED  TO THE SCRUBBER* THUS SIGNIFICANT

SOS CONTROL IS ACHIEVED.  THE UNDERFLOW IS  SENT  TO A NASTE TREATMENT PLANT* WHERE  THE FLYA8H IS  RE-

MOVED AND LANDFILLEO.  THE EFFLUENT  DISCHARGE  FROM THE WASTE TREATMENT PLANT  IS  10 - 85 GPM.
                                                 7S

-------
                                                                             STATUS TO APRIL  1979




                                      SECTION  9 (CONTINUtO)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL FBI) SYSTEMS ON INDUSTRIAL BOILERS



GENERAL MOTORS CORPORATION; PONT I AC, MICHIGAN (CONTINUED)






    THE SCRUBBERS, TRAYS, AND MIST ELIMINATORS (RADIAL VANE TYPE) ARE ALL MADE OF 316L S3.




    REFER TO FI6UKE 14-14 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.






                                         OPERATING HISTORY



2ND OUARTER-1976   UNSTABLE PH CONTROL AND NEAR OF MECHANICAL EQUIPMENT HANDLING THE FLYASH SLUHRY




MERE MAJOR STARTUP PROBLEMS.








5RD OUARTER-1977   AN AVAILABILITY OF 100 PERCENT HAD BEEN REPORTED HHEN BURNING A MIXTURE OF COAL




AND REFUSE.  THE SCRUBBER DISCHARGE SLURRY CAUSED WEAR DUE TO ITS FLYASH CONTENT.








4TH OUARTER-1977    FLYASH ABRASION IN THE PUMPS AND PIPING CONTINUED TO BE THE PROBLEM.








1ST OUARTER-1978    FLYASH CAUSED SERIOUS EROSION OF LIQUID HANDLING EQUIPMENT.








2ND OUARTER-1978    IT MAS DECIDED TO INSTALL PRESSURE FILTERS IN THE SCRUBBER EFFLUENT LINES TO




REMOVE FLYASH.








3RD OUARTEN-197*    THE PRESSURE FILTERS WERE INSTALLED AND ARE WORKING MELL.  NO OTHER




PROBLEMS OCCURRED DURING THE REPORT PERIOD.








«TH OUARTER-1978    NO NEN OPERATING PROBLEMS DEVELOPED DURING 1HIS REPORT PEMUD.  THE PRESSURE




FILTERS MERE INSTALLED IN THE RECIRCULATION PIPING BETWEEN THE RECYCLE PUMP AND THE INLET TO THE




ABSORBER.  THEIR PERFORMANCE THUS FAR HAS BEEN RATED AS EXCELLENT.








1ST 8UARTER-1979    AN AVAILABILITY OF JOOX WAS REPORTED FOR THE PERIOD.  NO OPERATING PROBLEMS




KERE ENCOUNTERED.
                                                7b

-------
                                                                             STATUS TO APRIL   1979

                                      SECTION  <* (CONTINUED)

             PERFORMANCE DESCRIPTION FOR OPERATIONAL F60 SYSTEMS ON INDUSTRIAL BOILEHS
  INSTALLATION NAME

  INSTALLATION LOCATIUIv

  SOURCE CHARACTERISTICS

  SOURCE HATING

  NUMBER OF SEPARATE Ffai» UMTS

  NUMBER OF bOILEKS bEING CUNTWOLLtO

  SOURCE CAPACITY
  CONTROL SYSTEM

  CONTROL PROCESS

  NEW / RETKOUT

  START-UP OA1E

  CONTROL SYSTEM STATUS

  302 REMOVAL EFFICIENCY

  PAKTICULATt REMOVAL EFFICIENCY

  WATER MAKE-OP

  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
GENERAL MOTORS CORPORATION

ST. LOUISf MISSOURI

COAL (J.2X SULFOK)

6<*,OUO SCFM (TOTAL - i BOILERS)

 2

 2

3* MA (TOTAL - 2 UUILERS)

(FOK THIS KEPOHT, UNLESS STATED OTHERWISE, 20UO SCFM - 1 EQUIVALENT MW.
THIS IS bECAUSE GAS FLOM KAfE IS THE PRIMARY FACTOR IN MODULE SIZING.)

A.U. LITTLE

SODIUM HYOROXIOE SCKUBBING

RETROFIT
OPERATIONAL

90+1 (auuu PPM d INLET)

REMOVED bY PRECEDING CYCLONE AND ESP

OPEN LOOP

WASTEnATER TREATMENT AND DISCHARGE TO CITY SEWER

NA2S01 OXIDIZED TO NA230U, PH NEUTRALIZED AND DISCHARGED TO

CITY SEhEH SYSTEM

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION

    THE GENERAL MOTORS CORPORATION PLANT LOCATED IN ST. LOUIS, MISSOORI OPERATES 4 COAL-FIRED BOIL-

ERS.  TWO OF THESE BOILEHS, ONE PULVERIZED COAL-FIRED AND THE UfHER A  SPREADER STOKER, ARE RATED AT

A TOTAL OF 250,000 Lti/HR STEAM AND GENERATE ABOUT  64,000 SCFM OF FLUE  GAS.  COAL COMPOSITION IS

TYPICALLY 3.2» SULFUR ANO 10* ASH.  THE ST. LOUIS  S02 EMISSION REGULATION OF 1.4 L8S/MM BTU APPLIES

ONLY FROM OCTOBER THROUGH MARCH, AND THE SCRUUbERS OPERATE ONLY DURING THIS PERIOD.  FLUE GAS FROM

ALL FOUR BOILERS EXITS THROUGH A COMMON STACK AND  SUFFICIENT FLUE UAS  FROM THE TWO CONTROLLABLE

BOILERS IS SCRUBBED TO MAINTAIN THE REGULATION AT  THE STACK UOTLET.  THE REMAINING FLUE GAS BYPASSES

THE SCRUBBERS, AND A CUMPLEX DAMPER SYSTEM ALLUrtS  PLANT PERSONNEL TO VARY THE SCRUBBER/BYPASS RATIO.

BOTH BOILERS ARE EQUIPPED WITH CYCLONES FOR PARTICIPATE REMOVAL, AND THE PULVERIZED COAL UNIT ALSO

UTILIZES AN ESP.

     THE SCRUbBER CONSISTS OF A THREE-STAGE IMPINGEMENT TOWER WITH A CHEVRON MIST ELIMINATOR.  THE

SYSTEM IS EUU1PPEO WITH DIRECT STtAM COIL REHEAT.  THE 1RAY lUttER AND MIST ELIMINATOR ARE CONSTRUC-

TED OF 310L STAINLESS SI EEL.
                                                77

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9  (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS



GENERAL MOTORS CORPORATION! ST. LOUIS, MISSOURI (CONTINUED)





                                         OPERATING HISTORY



3RD QUARTER-1977    AN OPERADILITY OF 100X MAS REPORTED DURING THE MAY-AUGUST PERIOD.







4TH BUAKTER-1977    IN SPITE OF A CHEVRON DEMISTER AND 60 F REHEAT, THE STACK LINER WAS CORRODED.







1ST 8UARTER-1978    THE DUCTWORK DOWNSTREAM OF THE SCRUBBERS DEVELOPED SOME LEAKS.







2ND QUARTER-1976    A HORIZONTAL PORTION OF THE DOWNSTREAM OUCT40RK,ABOUT 15-20 FEET IN LENGTH, MILL



BE REDESIGNED TO AVOID STAGNATION OF EXHAUST GASES







3RD OUARTER-197U    THE DOWNSTREAM DUCTWORK WAS RECONSTRUCTED DURING THE REPORT PERIOD.








4TH OUARTER-1978    NO NEW FGO-RELATED PROBLEMS HAVE DEVELOPED DURING THE REPORT PERIOOf HOWEVCRr



THE PLANT HAS REPORTED THAT PLUME OPACITY HAS BECOME A PROBLEM.







1ST OUARTER-1979    PLANT PERSONNEL REPORTED AN AVAILABILITY OF 90X FOR THIS PERIOD.  A SHORTAGE OF



CAUSTIC REAGENT MAS RESPONSIBLE FOR SOME DOWNTIME DURING MARCH.  ALSO* FAN BEARINGS HAD TO BE



REPLACED.  THE COAL FIRED BOILERS AND ACCOMPANYING 302 CONTROL SYSTEMS WERE SHUT DOWN FOR THE



SUMMER AT THE END OF MARCH.
                                                76

-------
                                                                              STATUS TO  APRIL   1979

                                       SECTION   9  (CONTINUED)

             PERFORMANCE DE3CKIPTIUN FOH OPERATIONAL FGO  SYSTEMS ON  INDUSTRIAL BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE HATING
  NUMBER UF SEPARATE FBO UNITS

  NUMBER OF BUILENS BEING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENOUH

  CONTROL PROCESS

  NEH / RtTKOFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  802 REMOVAL EFFICIENCY

  PARTICIPATE REMOVAL EFFICIENCY

  WATER MAKE-UP

  SLUDGE Oft BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
GENERAL MOTORS CORPORATION

TONOWANDA, NEW YORK

COAL (1.2X SULFUH)

92iUUO SCFM (TOTAL * 4 BOILERS)

36,000 ACFM a) 406 F, FUrt EACH OF 3 FGO SYSTEMS

19,600 ACFM «l 350 F, FOR 1 FGO SYSTEM

jaO,000 Lfl/HK STEAM (IOTAL - 4 BOILERS)

 4

 4

46 Mh (EQUIVALENT)! 1UTAL - 4 BOILEKS

(FOR THIS REPORT* UNLESS STATED OTHERHISE, 2000 SCFM * 1 EUUIVALbNT MM.
THIS IS BECAUSE GAS FLO* RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

FMC ENVIRONMENTAL EQUIPMENT

SODIUM HYDROXIDE SCRUBBING

RETROFIT

JUNE, 1973

OPERATIONAL

90X-95X 11,000 PPM 8 INLEt)

90S (1.0 LB/MM OTU AT INLET)

OPEN LOOP

NASTEMATtR TREATMENT

FLY ASH AND NA2803/3D4 WASTE LIUUUR OEKATERED AND THEN TO

SANITARY LANDFILL

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION

    THE CHEVROLET DIVISION UF GENERAL MOTORS HAS A MOTOK PRODUCTION PLANT AT TONONANOA, NEW YORK.

THERE ARE 4 COAL-FIRED BOILERS AT  THE FACILITY WHICH BURN  1.16 PERCENT  SULFUR COAL WITH A HEATING

VALUE OF 12,650 BTU/LB.  THE TOTAL COAL FEED RATE  IS 17 TONS/HR NHICH IS EQUIVALENT TO 412 MM BTU/HR

HHICH IS EQUIVALENT TO 46 M« OF ELECTRICAL GENERATION.

    ONE SCRUBBER HANDLES 39,000 ACFM AT 350 F hHEREAS EACH OF THE OTHER THREE 36,000 ACFM AT 406 F.

THERE IS A CYCLONE BEFORE AND AFTER SCRUBBER FOR OUST COLLECTION AND MIST REMOVAL PURPOSES, RESPEC-

TIVELY.  THE VARIABLE THROAT VENTUHI SCRUBBERS MERE SUPPLIED BY FMC CORP.  THE PH OF RECYCLE

SCRUBBER LIUUOR IS CONTROLLED AT 7.0 AND A L/G RATIO OF 20 GALLONS/1000 ACF IS USED.  PRESSURE DROP

ACROSS EACH SCRUBBER IS 1U IN. ttG.  CAUSTIC SODA IS ADDED  TO THE SPENT LIQUOR IN A SEPARATE RECYCLE

TANK.  THE BLEED OFF RATE FROM THE RECYCLE TANK VARIES FROM 25 - 100 GPM.  THE DISCHARGE CONTAINS

FLYA3H AND SODIUM SULFATE.  THE FLYASH IS CONTROLLED AT LESS THAN IX SUSPENDED SOLIDS.  THE EFFLUENT

IS DISCHARGED TO THE WASTE TREATMENT PLANT AFTER AERATION.  THE AVERAGE INLET CONCENTRATIONS ARE

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9  (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON  INDUSTRIAL BOILERS



GENERAL MOTORS CORPORATION; TONOWANDA, NEn YORK  (CONTINUED)






0.85 LB/MM BTU OF 802 AND 1 L8/MM BTU OF PARTICULATE.  THE EFFICIENCY OF S02 REMOVAL IS 90* WHEREAS



THAT OF PARTICULATE REMOVAL IS 60X-95X.




    EACH SCRUBBER AND THE CYCLONIC OEMISTER  15 MADE OF 316L S3.  PLUME REHEAT IS NOT INCORPORATED



INTO THE SYSTEM.  THE ENERGY REOOIREMENTS FOR THE SYSTEM ARE ABOUT 3 - 5X OF THE FUEL BURNED.




    REFER TO FIGURE 11-15 IN SECTION la FOR  A DETAILED PKOCESS FLOW DIAGRAM OF THIS SYSTEM.








                                         OPERATING HISTORY




3RD QUARTER-1977    AVERAGE UPERABILITY DURING 1HIS PERIOD MAS REPORTED TO BE 1UOZ.








4TH OUARTER-1977    MAJOR PROBLEMS HAVE BEEN Ph CONTROL AND RECYCLE PIPE EROSION.  CONTROL



SENSORS/MODULATING MIXER VALVE REPLACED FUR  PH CONTROL AND CAST IRON PIPE WAS USED TQ




REPLACE S3 RECYCLE PIPING.  DURING NOV - DEC CONDENSATION FOLLOWING  THE OEMISTER




HAS CORRODED THE STACK LINING.  A DECISION HAS BEEN MADE TO RELINE THE STACK.








1ST OUARTER-1976    THE STACK MAS NOT RELINED.








2ND OUARTER-1978    ONE MORE CYCLONE MILL BE RETROFITTED AFTER EACH BOILER IN ORDER TO REDUCE THE




PARTICULATE LOADING TO THE SCRUBBERS.








3RD 8UARTER-1978    A MIST ELIMINATOR MILL BE INSTALLED TO PREVENT FURTHER CORROSION OF THE STACK




LINER.  THE LINER HILL EITHER BE REPLACED OR COATED NITH AN ACID-RESISTANT MATERIAL.








4TH QUARTER-197B    NO DEFINITE PLANS HAVE BEEN MADE REGARDING THE STACKS.  THE ORIGINAL STACKS




(MOUNTED ATUP THE ABSORBERS) AKE STAINLESS STEEL.  THEY ARE CORHOUEOf BUT NUT BEYOND USE.  THE MIST




ELIMINATORS TO BE INSTALLED "ILL Bt CHEVRON-1YPE.  THE MATERIAL HAS NOT BEEN SELECTED* BUT SOME SORT



OF PLASTIC IS CONSIDERED LIKELY.  THEKE AKE NO PLANS TO ADO CYCLONES FOLLOWING THE BOILERS, A FACT




ERRONEOUSLY REPORTED DURING THE 2ND UUAKTfcR.








1ST OUARTEH-1979    AN AVAILABILITY INDEX OF 1001 HAS REPORTED FOR THE PERIOD.  NO DECISION




HAS BEEN MADE REGARDING THE STACKS.

-------
                                                                             STATUS TO APRIL  1979
                                      SfcCTlON  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FUR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION NAME.
  INSTALLATION LUCATIUN
  SOURCE CHARACTERISTICS
  SOURCE KATIHG
  NUMBER OF  SEPARATE Fti) UMTS
  NUMBER OF  BOILERS btING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  802 REMOVAL EFFICUNCY
  PARTICULAIE REMOVAL EFFICIENCY
  WATER MAKE-UP

  SLUUGfc OR  tiY-HROOUCT DISPOSAL
  CONTROL SYSTEM COST
GEORblA-PACIFIC PAPER CO.
CSOSSETT, ARKANSAS
BARK.CUAL/01L (l.SX - 2.OX SULFUR)
220,000 SCFM (1 BOILER)
 1
 1
110 M« (EQUIVALENT)
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM s 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLOW KATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
NEPTUNE AlNPOL, INC.
CAUSTIC WASTE STREAM
MEW
JULY, 1975
OPERATIONAL
fl(JX  (500 PPM a! INLET)
901  (0.5 GR/SCF AT INLET)
OPEN LOOP; SCRUBBED WITH 2,300 GPM "BLACK WATER* FROM PULP
MILL,
KASTtWATER TREATMENT AND DISCHARGE TO CITY SEWER
SEE  SECTION  13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION
    THE FGD SYSTEM AT GEORGIA-PACIh1C PAPER CO., CKOSSETT, ARKANSAS UTILIZES A CAUSTIC PULP MILL
WASTEWATER STREAM (BLACK MATER) TO REMOVE PARTICIPATE AND S02 FROM FLUE GAS GENERATED BY A BARK/OIL
OR BARK/COAL bOILER.  THE BOILER IS AN ERIE CITY POWER BUILER RATED AT 600,000 LB/HOUR STEAM, AND
GENERATES 220,000 SCFM UF FLUE GAS, WHICH IS EbUIVALENT TO 110 MM OF ELECTRICAL CAPACITY.  THE
NORMAL OPERATING RANGE IS BEtwEEN 400,000 AND 500,000 LBS STEAM/HOUR WITH AN OPERATING SCHEDULE OF
24 HOURS/OAT, 359 UAYS/YtAH.  IT IS UNfc OF ELEVEN  BOILERS THAT TURN 5 TURBINES AND GENERATE 45 MM.
    THE FLUE GAS IS DUCTED TO A SINGLE SCRUBBER AT  THE RATE OF 320,000 ACFM A 310 F BY MEANS OF A
BUFFALO FORGE I.D. FAN WHICH IS DRIVEN BY A 4000 HP wESUNGHOUSE TURBINE.  THE SCRUBBER ITSELF IS
HADE OF 304 SS AND CONSISTS OF AN UNLIwED VENTURI  THROAT  (9.5 FT X 30 FT) AND A FIBERGLASS LINED
LI8UIU-GAS SEPARATOR (2« FT X 55 FT) WITH NO INTERNAL PARTS.  THE DUCTWORK LEADING TO AND FROM THE
SCRUBBER IS MADE OF STEEL AND THE DOWNSTREAM PORTION IS FIBERGLASS LINED.  NO MIST ELIMINATOR OR RE-
HEATER IS USED BECAUSE THE 304 SS STACK IS FIBERGLASS LINED.  THE RECICULATION SYSTEM CONSISTS OF A
104 S3 UNLINEO RECIRCULATION TANK AND A 5000 GPM INGERSOLL-RAND PUMP.  AN IDENTICAL SPARE PUMP IS
ALSO ON HAND BUT IS NOT TIED INTO THE SYSTEM.  THESE PUMPS ARE MAOE OF 304 SS AND ARE RUBBER LINED.
THEY OPERATE AT MAXIMUM CAPACITY.  THE PIPING IS MADE OF FIBERGLASS.  THE BLEED STREAM FROM THE RE-
CIRCULATION SYSTEM IS FED TO THE CITY SEWERS AT A  RATE OF 2000 GPM AND THE MAKE-UP SCRUBBING LIQUOR

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION  9  (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL F6D SYSTEMS ON INDUSTRIAL BOILERS
GEORGIA-PACIFIC PAPER CO. I CROSSETT, ARKANSAS (CONTINUED)

IS FED TO THE SYSTEM AT A RATE OF 2300 GPM.
    REFER TO FIGURE 14-16 IN SECTION 14 FOR A DETAILED PROCESS FLON DIAGRAM OF THIS SYSTEM.

                                         OPERATING HISTORY
3RD OUARTER-I977    PLANT REPORTED SATISFACTORY OPERATIONS WITH NO MAJOR PROBLEMS.  THE FIBERGLASS
LINING IN THE SCRUBBER FAILED FREQUENTLY AND HAS REPLACED AS IT FAILED.

4TH OUARTER-I977    NO FIBERGLASS LINER FAILURE MAS DETECTED DURING THIS REPORT PERIOD.

ZNO QUARTER-1978    PLANT REPORTED NO MAJOR PROBLEMS DURING THE FIRST SIX MONTHS OF 1974.  TOTAL
BOILER-SCRUBBER DOWNTIME SINCE JANUARY I, HAS ABOUT IS DAYS.  THE PROBLEMS MERE THE LOSS OF A PUMP
LINER AND A BOILER I.D. FAN TROUBLE.

3RD QUARTER-1978    THE PUMP WITH LINING PROBLEMS HAS REPLACED.  THIS CAUSED A SCRUBBER DOHN TIME OF
APPROXIMATELY 36 HOURS.  THE REASON FOR THE PUMP FAILURE IS UNKNOWN, BUT UNEVEN LINING APPLICATION
IS LIKELY.  THIS PUMP LASTED ROUGHLY 3 MONTHS BEFORE THE LINING OF THE IMPELLER BEGAN COMING OFF IN
CHUNKS.  THE NEW PUMP IS THE SAME TYPE AND HAS HAD NO PROBLEMS.  THE SPARE IS ALSO OF THE SAME TYPE.
SINCE REPLACEMENT OF THE RECIRCULATION PUMP THE SCRUBBER HAS OPERATED CONTINUOUSLY (SCRUBBER SHUTS
OOHN NHEN THE RECIRCULATION PUMP GOES OUT).

4TH QUARTER-1978    NO OPERATING PROBLEMS MERE REPORTED DURING THIS SURVEY PERIOD.  THE OPERATION OF
THE RECIRCULATION PUMP HAS SATISFACTORY.  THE BOILER MAS BURNING MOSTLY BARK SUPPLEMENTED NITH OIL.
THE FGD SYSTEM DEMONSTRATED A RELIABILITY FIGURE OF 100X.

1ST OUARTER-I979    THE FGD SYSIEM OPERATED NITH NO PROBLEMS THROUGHOUT THE QUARTER.  BARK HAS
BURNED DURING THE PERIOD AND OIL HAS ADDED 5-10X OF THE TIME TU HELP MITH STEAM PRODUCTION.
                                                B2

-------
                                                                             STATUS TO APKIU  1979

                                      SECTION  9 (CONTINUED)

             PERFORMANCE DESCRIPTION FUK OPERATIONAL FGD SYSTEMS ON INOUSTKlAL BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE MATING

  NUMBER OF  SEPARATE F(iO UNITS

  NUMBER OF  BOILERS BEING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEM / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  502 REMOVAL EFFICIENCY

  SLUUGE UK  BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
GETTY OIL COMPANY

BAKERSHELD, CALIFORNIA

OIL U.U SULFUM)

72,000 SCFM (TOTAL - 6 riUILERS)

 1

 b

36 MW (EQUIVALENT) J b bOlLEKS, EACH ol 50 MM BTU/HH

(FOK [HIS REPORT, UNLESS STATED OTHERWISE, dOOU SCFM = 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLOW KATE IS THE PRIMARY FACTOR IN MODULE SUING.)

FMC ENVIRONMENTAL EQUIPMENT

SOUIUM CARbONATE SCRUBBING

HETMGF1T

JUNE, 1977

OPERA UONAL

90+X 1600 PPM d INLET)

HOLDING POND FOK EVAPORATION

6 GPH ULEEOOFF TO A BLOwOOflN TANK.  THE BLOWOOXN IS THEN

SENT TO A DISPOSAL POND ONCE A MEEK.

SEt SECTION 13 FOK DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION

    GETTY OIL COMPANY HAS AN OIL FIELD NEAR BAKERSFIELD, CALIFORNIA «HICH OCCUPIES ABOUT 15 SQUARE

MILES.  THERE"ARE 136 STEAM GENERATORS) 100 wIlH A HEAT RATE OF SO MM BTU/HK AND 36 *ITH A HEAT

HATE OF 20 MM BTU/HR.  THE FUEL USED IS CRUDE OIL  HlTh 1.1X SULFUR ANU A HEATING VALUE OF 6.4 MM

BTU/BBL.  STEAM IS DISTRIBUTED THROUGHOUT THE OIL  FIELD BY INSULATED PIPELINES AND INJECTED INTO

THE OIL WELLS.  CONDENSATION OF THE STEAM REDUCES  THE VISCOSITY OF THE OIL, NHICH FLOfcS FREELY TO

THE SURFACE ALONG WITH THE WATER.  THE UIL IS SEPARATED FROM WATER BY DECANTATIUN IN SETTLING TANKS,

AND PURIFIED BY DISTILLATION IF REQUIRED.

    THE FLUE GASES (130,000 ACFM « 500 F) FROM SIX BOILERS (bO MM BTU/HR EACH) ARE MANIFOLDED

INTO « THAY ABSORBER (13.5 FEET DIA X 35 FEET HIGH) WHICH HAS RETROFITTED IN JUNE 1977 BY FMC

ENVIRONMENTAL EQUIPMENT DIVISION.  THE PROCESS IS  SODIUM CARBONATE SCRUBBING.  THE RECIKCULATION

LIQUOR IS MAINTAINED AT A PH OF 6.6, WITH AN L/G RATIO OF 8.4 GAL/1000 ACF.  THE RECIRCULATION FLOW

18 1000 GPM.  A BLEED STREAM OF 6 GPM IS CONTINUALLY SENT TO THE BLOHDOMN TANK WHICH IS EITHER

EMPTIED INTO A DISPOSAL POND OK INJECTED INTO DEEP WELLS EVERY MEEK.  THE INLET AND OUTLET 302 CON-

CENTRATIONS ARE 600 PPh AND 60 PPM RESPECTIVELY.   THE ABSORBER, THEREFORE, HAS 90S S02 REMOVAL

EFFICIENCY.

    THE ORIGINAL ABSORBER CONTAINED THREE DISK-AND-DONUT TRAYS AND AN INCONEL MIRE MESH MIST ELIMI-

NATOR.  THE ABSORBER MODULE ANU THE STACK ARE MADE OF 316L SS, WHEREAS THE DOMNSTREAM DUCTWORK
                                                83

-------
                                                                              STATUS  TO  APRIL   1979
                                       SECTION  9 (CONTINUED)
              PERFORMANCE  DESCRIPTION  FOR  OPEKATIONAL  F60  SYSTEMS  ON  INDUSTRIAL  BOILERS
 6ETTY  OIL  COMPANY)  BAKERSFIELO,  CALIFORNIA  (CONTINUED)

 AND  THE  RECIRCULATION  PIPING  ARE MILD STEEL.   THE  RECIRCULATION PUMP IS  RUBBER  LINED.
     SOME IMPORTANT  MAINTENANCE  PRACTICES  ARE<
       1. DAILY  CHECK AND  CALIBRATION  OF PH  CONTROLLERS.
       2. FREQUENT CHECKS  ON FLUM HATERS (MAKEUP  WATER, SODA ASH,  RECIRCULATION  LI8UOR,  AND SLOWDOWN)
         AND  FLUID  LEVELS (SLOWDOWN TANK, SODA ASH TANK,  AND  SCRUBBER).
       3. MEEKLY FILLING OF SODA  ASH TANK  AND  DISPOSAL OF  BLOWDOrtN.
       «. SCHEDULED  LUBRICATION  OF PUMPS AND FAN, SEAL REPLACEMENT.
     REFER  TO  FISURE 14-17 IN  SECTION  14 FUR A  DETAILED PROCESS FLON  DIAGRAM  OF  THIS  SYSTEM.

                                          OPERATING HISTORY
 3RD  QUARTER-1977    THE RECIRCULATION PUMP  LINER HAS  CHANGED  FROM BUNA-N TO  NATURAL  RUBBER, DUE TO
 THE  SMELLING  OF THE FORMER LINER.   1HE RUBBER  PINCH VALVE ON  THE  RECIRCULATION  PUMP  HAS REPLACED BY
 A 38 OLOBE VALVE.   THERE  HERE SOME  MINOR  PROBLEMS  HITH THE PH AND LEVEL  CONTROLLERS.

 4TH  QUARTER-1977    THE FAN ROTOR HAS  STRENGTHENED  AND CLEANED OF  THE SCALING.   THE FAN  BEARING
 BURNED UP.  IT  MAS  REPLACED AND  THE FAN MAS REALIGNED.

 1ST  QUARTER-1978    HIGH  STACK  DISCHARGE  VELOCITY  (60 FPS) CAUSED BY SMALL STACK DIAMETER AND POOR
 LOCATION OF MIST ELIMINATOR (TOO CLOSE TO STACK  TRANSITION SECTION)  RESULTED  IN HIGH ENTRAPMENT OF
 DROPLETS.   THE  STACK AND  TOP  SECTION  OF THE SCRUBBER HERE REDESIGNED.

 2ND  QUARTER-1978    THE MESH  OEMISTER  MAS REPLACED BY A MUNTEHS CHEVRON  TYPE MIST ELIMINATOR.
 A KOCH FLEXITRAY HAS INSTALLED  ABOVE  THE  SRD TRAY  IN ORDER TO IMPROVE soz REMOVAL EFFICIENCY,
 PARTICULARLY  DURING TURNDOWN  CONDITIONS.  THE  PH PROBES ARE FOULED FREQUENTLY.  SEVERAL
 TYPES  OF CONTROLLERS AHE  PRESENTLY BEING  TESTED  FOR HIGH  RELIABILITY.  THE MILD STEEL RECIRCULATION
 LINES  MERE ERODED,  AND MILL HE REPLACED BY 316L  38.  THE  AIR  BUBBLER IN  THE 300* ASH TANK LEVEL
 CONTROLLER IS UFTEN PLUGGED.  IT WILL  BE REPLACED  BY A DIAPHRAGM-TYPE LEVEL CONTROL DEVICE.  THE
 BLOMDONN TANK OUTLET LINE HAS DEVELOPED SCALING.   A POSITIVE  DISPLACEMENT PUMP HAS TO BE INSTALLED
 IN THIS LINE, AND A SCALING INHIBITOR  HAS POSSIBLY  TO BE  ADDED IN THE TANK LlUUUR.

 3RD QUARTER-1978    THb BLOftOUHN TANK UU1LET LINE  HAS REPLACED HITH  A ONE-INCH LINE TO  INCREASE
VELOCITY AND THUS SOLVE THE SCALING PROBLEM.   NEW  316L S3 HECIRCULATION LINES HAVE BEEN INSTAL-
LED,  AS HAS THE DIAPHRAGM-TYPE LEVEL CONTROL DEVICE IN THE SODA ASH  TANK.  PH CONTROLLERS ARE STILL
BEING TESTED.   A SCHEN-TYPE POSITIVE DISPLACEMENT  PUMP MAS INSTALLED, REPLACING AN EARLIER PUMP
NHICH ERODED DUE TO HIGH RPM.   A SILICON DI8PEKSANT IS NDM "BEING  ADDED TO THE LIQUOR TO ASSIST IN
ALLEVIATING THE SCALING PROBLEM, BUT THERE HAS NOT BEbN SUFFICIENT TIME  TO EVALUATE ITS
EFFECTIVENESS.  SINCE  AUGUST 7 THE SYSTEM HAS  EXPERIENCED ONLY 2 DAYS DOWNTIME DUE TO REPLACEMENT
OF FAN BEARINGS.
                                                84

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS



GETTY OIL COMPANY* BAKERSFIfcLD. CALIFORNIA (CONTINUED)





4TH QUARTER-1976   THE POSITIVE DISPLACEMENT (MOYNO) PUMP, WHICH HAS A NATURAL RUBBER STATOR AND



316L S3 ROTOR*  HAS EXPERIENCED ABRASION ON THE ROTOR.  EROSION IS CAUSED BY THE ASH COLLECTED IN THE



SCRUBBER AND SCALING.  SEVERAL OTHER MATERIALS SUCH AS CHROME-ALLOY AND NI-HARD ARE BEING



REVIEWED AS REPLACEMENTS.  THE BLEED-OFF STREAM FLOW IS CONTROLLED MANUALLY AS A FUNCTION OF ITS



SPECIFIC GRAVITY (SET PH-1.15).







18T~OUARTER-1979    THE SYSTEM MAS NOT OPERATED DURING THIS PERIOD AND MAY REMAIN SHUT DOWN IN THE



NEAR FUTURE DUE TO THE INTRICACIES IN THE CURRENT OIL PRICING REGULATIONS.
                                                 85

-------
                                                                              STATUS TO APRIL  1979

                                       SECTION  9 (CONTINUED)

              PERFORMANCE DESCRIPTION FUR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS
   INSTALLATION NAME

   INSTALLATION LOCATION

   SOURCE  CHARACTERISTICS

   SUUHCE  RATINE



   NUMBER  OF  SEPARATE  FGO UNITS

   NUMBER  OF  BOILERS BEING CONT«OLLEU

   SUUKCE  CAPACITY
  CONTROL  SYSTEM  VENUUK

  CONTROL  PROCESS

  Ntw  /  RETROFIT

  START-UP DATE

  CONTROL  SYSTEM  STATUS

  S02  REMOVAL  EFFICIENCY

  PARTICIPATE  KEMOVAL  EFFICIENCY

  SLUUGE UR  BY-PRODUCT DISPOSAL
  CONTROL  SYSTEM  COST
'GETTY OIL COMPANY

bAKERSFIELO, CALIFORNIA

OIL  (1.1X SULFUR)

691,000 SCFM (TOTAL -61 BOILERS)

9 FtiO SYSTEMS, EACH TREATING  180,000  ACFM S 500 F.

 9

«1

245 KM (EQUIVALENT); 4050 MM  BTU/HR  (TOTAL-81 BOILERS)

EACH BOILER RATED AT 42,000 LBS/HR STEAM

(FUN IHIS REPORT, UNLESS STATED OTHERWISE. 2000 SCFM s 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLOW RATE IS THE  PRIMART FACTOR IN NODULE SIZING.)

IN-MUUSt DESIGN

SODIUM CARBONATE SCRUBBING

RETROFIT

DECEMBER, lira

OPERATIONAL

9bZ (600 PPM 302 d INLET)

SOX (35 LB/HR ASH it INLET)

NASTEHAIER TREATMENT AND DISCHARGE TO TAILINGS POND

HOLDING POND FOR EVAPORATION.

9 GPh tiLEEOOFF TO A dLOMOOwN  TANK.  THE BLOfcOOWN IS EMPTIED

INTO A DISPOSAL POND ONCE A WEEK.

SEE SECTION 13 FOR DETAILED ECONOMIC  INFORMATION
                                        BACKGROUND  INFORMATION

     GETTY OIL, COMPANY  HAS  AN  UIL  FIELD N£Ah BAKEH3FIELO, CALFURNIA, NHICH OCCUPIES ABOUT 15 SQUARE
                                           I
MILES.  THERE ARE  lib  STEAM  GENERATORS; 100 MTU A  HEAT RATE OF SO MM STU/HR AND 36 NITH A HEAT

MATE OF 20 MM 8TU/HK.  THE FUEL USED  IS CRUDE UIL MITH 1.1X SULFUR AND A HEATING VALUE OF 6.4 MM
                                           i
UTU/BbL.  STEAM IS DISTRIBUTED  THRUUGHUUT  THE OIL FIELD BY INSULATED PIPELINES AND INJECTED INTO

THE OIL NELLS.  CUNUENSATION OF  THE STEAM  REDUCES THE VISCOSITY OF THE OIL, MHICH FLOMS FREELY TO

THE SURFACE ALONG WITH THE WATER.   THE OIL IS SEPARATED FROM HATER BY OECANTATION IN SETTLING TANKS,

AND PURIFIED BY DISTILLATION IF  REQUIRED.

     THE FLUE GASES (180,000 ACFM AT  iOO F) FROM NINE BOILERS (50 MM BTU/HR EACH) ARE MANIFOLDED

INTO ONE ABSORBER (IB FT DIA X  55 FT  HI6H)j  EACH ABSORBER HAS 3 FLEXITRAYS AND ONE FLEXICHEVRON

DEHISTEK SUPPLIED BY KOCH ENGINEERING.  THE OVERALL DESIGN OF THE FGD SYSTEMS, HOWEVER, IS PERFORM-

ED INHOUSE BY GETTY OIL ENGINEERS.  THE PROCESS USED IS SODIUM CARBONATE SCRUBBING.  THE FLUE 6A3ES
                                           |
ARE QUENCHED IN THE BOTTOM PAR1  OF THE ABSORBER.  THE RECIRCULATION LIQUOR PH IS MAINTAINED BETWEEN

fr.S-6.ft AND HAS 17 PERCENT DISSOLVED  SOLIDS BY HEIGHT.  THE DESIGN L/6 RATIO IS 9 GAL/1000 ACF AND

-------
                                                                             STATUS TO APRIL  1979




                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOH OPERATIONAL FGD SYSTEMS UN INDUSTRIAL BOILERS




6ETTY OIL COMPANY; BAKERSFIELD, CALIFORNIA (CONTINUED)






THE FLOW TO THE TOP TRAY IS ABOUT 1300 GPM.  A BLEED-OFF STREAM OF 9 6PM IS CONTINUOUSLY SENT TO A




SLOWDOWN TANK, WHICH is EMPTIED INTO A DISPOSAL POND ONCE A WEEK,  THE ABSORBER is DESIGNED TO



REMOVE 96X OF S02 (600 PPM AT  INLET) AND ABOUT 50 PERCENT OF THE ASH (35 LB/HR AT INLET).




     REFER TO FIGURE 14-16 IN  SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.








                                        OPERATING HISTORY




3RD UUARTER-1978    OF THE 9 FGD SYSTEMS UNDER CONSTRUCTION, ONE HAS STARTED UP ON SEPT. 10, 19T8



AND ANOTHER IS SCHEDULED FOR START-UP THE FIRST WEEK IN OCTOBER.   THE LAST OF THE SYSTEMS IS




SCHEDULED FOR START-UP BY MID  FEBRUARY.








4TH QUARUR-ma   A TOTAL OF  FIVE FGD SYSTEMS HAVE STARTED UP.  THE MAIN STARTUP PROBLEMS AND THEIR




SOLUTIONS ARE I



1.  SCALING—THE STEAM CONDENSATE IS FILTERED, SOFTENED AND RECYCLED TO THE GENERATORS AND THE FCO



SYSTEMS.  STILL, SOME OF THE DISSOLVED SPECIES SEEM TO CAUSE SCALING IN THE ABSORBERS NHEN




SUBJECTED TO A PH CHANGE.  SILICON OISPERSANTS HAVE BEEN USED  TO REDUCE THE SCALING.



2.  FANS—MISALIGNMENT UF BEARINGS HAS BEEN A FREQUENT SOURCE  OF HIGH  VIBRATIONS.  ALL THE FANS ARE




FORNARO-CURVEU-BLADE CENTIFUGAL TYPE. WITH A DESIGN RATING OF  11 IN N6. AT 500 HP.  SOME OF THE




FANS, HOWEVER, HAVE NOT BEEN ABLE TO GENERATE THE SPECIFIED POSITIVE PRESSURE.  PROPER VENDOR




SELECTION MAY BE THE SOLUTION.



3.  MIST ELIMINATOR—IN ONE ABSORBER, THE FLEXI-CHEVRON MIST ELIMINATOR HAS ACHIEVED LON DROPLET




REMOVAL.  THIS MAY tfE DUE TO CHANNELING IN THE ABSORBER, AND THE PROBLEM  IS UNDER  INVESTIGATION.




SOME OTHER CHEVRON MIST ELIMINATORS MAY BE EVALUATED.



    OUT OF THE <4 REMAINING UNITS, 2 AXE SCHEDULED 10 STAKT-UP  IN MID-JANUARY  AND 2 IN MID-FEBRUARY




1979.  ONE FGU SYSTEM WHICH STARIED-UP  IN OECEMbEK  1970 IS USING SODIUM HYDROXIDE  SCRUBBING IN AN




ATTEMPT TO EVALUATE THt PERFORMANCE OF CAUSTIC AGAINST SOU* ASH AS  THE ALKALI.






1ST OUARTEH-1979    GETTY UIL  COMMISSIONED ALL THE  REMAINING 4 SYSTEMS IN THE END  OF JANUARY/EARLY




FEBRUARY PEKIUD.  AFTER CONDUCTING PERFUHHANCE TESTING, HOWEVEK, FIVE  OF  THE  SYSTEMS WERE




SHUT DOWN FUN  THE REST OF THE  PEKIOO.  DURING  THE NEXT UUARTER, TNU ADDITIONAL SYSTEMS WILL BE




SHUT DOftN.  THUS ONLY TWO OF THE  TOTAL 9  SYSTEMS  WILL REMAIN OPERATIONAL  IN THE NEAR FUTURE.  THIS




DECISION HAS BEEN MAUE UUb  TO  INTRICACIES  IN CUrtKENT OIL PRICING REGULATIONS.



    DURING THIS PtKIOO, THE FUUK  OPEKATIONAL SYSTEMS HAVE DEMONSTRATED A  RELIABILITY OF  100*.
                                                 87

-------
                                                                             STATUS TO APRIL  1979

                                      SECTION  9 (CONTINUED)

             PEKFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE MATING



  NUMbER OF SEPARATE FCU UNITS

  NUMBER OF BOILERS BEING CONTROLLED

  SOUkCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEK / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  302 REMOVAL EFFICIENCY

  SLUD6E OR BV-PROOUCT DISPOSAL
  CONTROL SYSTEM COST
GETTY OIL COMPANY

ORCUTT, CALIFORNIA

OIL (4.OX SULFUR)

5000 SCFM (1 BOILER)

10,000 ACFM a 500 F.

 1

 1

2.5 MM CE8UIVALENT)

(FOX THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EOUIVALENT MM.
THIS IS BECAUSE GAS FLO* RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

IN-HOUSE DESIGN

SODIUM HYDROXIDE SCRUBBING

RETROFIT

JUNE, 1977

OPERATIONAL

94X (1600 PPM 4 INLET)

NON-FIXATED SLURRY TO LINED POND

1.4 GPM TO SETTLING POND, DEEPNELL INJECTED.

6    4.0

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                      BACKGROUND INFORMATION

    AT THE ORCUTT SITE, GETTY OIL HAS ONE FGO SYSTEM ON ONE UF ITS 22 MM BTU/HR S1EAM GENERATORS.

ALTHOUGH THIS GENERATOR FIRES 4.0 PERCENT SULFUR, LOW GRAVITY, HIGH GRIT OIL, THE OTHER STEAM

GENERATORS AT THIS EOK SITE FIRE 0.03 PERCENT SULFUR INDONESIAN CRUDE OIL.  THIS UNIT HILL SERVE AS

A TEST UNIT AND ONGOING RESULTS HILL BE USED TO MAKE DECISIONS CONCERNING POSSIBLE ADDITIONAL FGD

OPERATIONS AT THE ORCUTT FACILITY.

    SINCE THE STARTUP UF THE SYSTEM, IT HAD SEVERAL OPERATIONAL PROBLEMS.  THt FAN MOTOR HAS

APPARENTLY UNDEHOESIGNtU.  THE THREE 01SC-AND-UONUT TRAYS HERE UNABLE TO OBTAIN MORE THAN 85

PERCENT 802 REMOVAL.  THE HIGH SILICA CONTENT OF THE MAKEUP MATER CAUSED SERIOUS EROSION OF THE

RUBBER-LINED PUMP.  THE SODA ASH STORAGE TANK, BECAUSE UF ITS EXCESSIVE CAPACITY, HAS NOT MIXED

COMPLETELY.  THIS FREUUENTLY LED TO SOLIDIFICATION OF THE SOLUTION.  IN VIEW OF THE NUMEROUS

OPERATIONAL PROBLEMS, THE FOLLOWING EXTENSIVE MODIFICATIONS HERE PERFORMED IN LATE 1978/EARLY 1979!

    1. THE FAN MOTOR HAS REPLACED BY A HIGHER H.P. MOTOR.

    2. THE UlSC-ANO-DONUT TRAYS MERE REMOVED COMPLETELY AND REPLACED BY A HUNTERS STATIC MIXING

       DEVICE A3 THE PACKING MATERIAL FOR GAS-LIQUID CONTACT.

    3. THE RUBBER-LINED RECIRCULATION PUMP MAS REPLACED BY A 316L SS PUMP AND HYDROCLUNES HERE

       INSTALLED IN THE RECIRCULATION LINE AFTER THE PUMP.
                                                aa

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS



6ETTY OIL COMPANY) ORCUTT, CALIFORNIA (CONTINUED)






    4. THE SOOA ASH TANK IS NO LONGER BEING USED, AS THE SYSTEM MAS CHANGED TO SODIUM HYDROXIDE



    REFER TO FIGURE 14-19 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.



       SCRUBBING.








                                         OPERATING HISTORY



1ST QUARTER 1979    THE ABOVE MODIFICATIONS HERE COMPLETED BY THE END OF FEBRUARY 1979.  THE SYSTEM




MAS STARTED UP ON MARCH 10, AND OPERATED WITHOUT ANY DOWNTIME FOR THE REST OF THE PERIOD.  THE




RELIABILITY WAS, THEREFORE, ABOUT 20X.  COMPLIANCE TESTS WERE PERFORMED IN THE 4TH WEEK OF MARCH




AND THE RESULTS ARE AWAITED.  IN LATE APRIL, SODIUM ALUMINATE WILL BE USED IN TRIAL RUNS TO COMPARE




THE MATERIAL WITH CAUSTIC FOR ITS 302 REMOVAL ABILITY AND COSTS IS/LB 302 REMOVED).

-------
                                                                              STATUS  TO APRIL   1979
                                       SECTION   9  (CONTINUED)
              PfcRFUKMAMCE  DESCRIPTION  FUH OPERATIONAL FGO  SYSTEMS ON  INDUSTRIAL  BUILEKS
   INSTALLATION  NAME
   INSTALLATION  LOCATION
   SOURCE  CHARACTERISTICS
   SOURCE  HATING
   NUMUER  OF SEPARATE FUO UNITS
   NUMBER  OF BOILERS BEING CONTROLLED
   SOURCE  CAPACITY
  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEM / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  302 REMOVAL EFFICIENCY
  PARTICIPATE REMOVAL EFFICIENCY
  HATER MAKE-OP
  3LUU6E OR HY-PHUUUC1 DISPOSAL


  CONTROL SYSTEM COST
GREAT SOUTHERN PAPER CO.
CLOAK SPRINGS, GEORGIA
BARK,COAL/OIL It.OX - 2.OX SULFUR)
420,000 SCFM  (TOTAL - 2 BOILERS)
 2
 2
£10 MM (EQUIVALENT)! TOTAL - I BOILERS
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM « 1 EQUIVALENT MW.
THIS IS BECAUSE GAS FLOrt RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
NEPTUNE AIRPOL, INC.
CAUSTIC WASTE STREAM
RETROFIT
197S
OPERATIONAL
OSX-90X (1,000 PPM AT INLET)
99.IX (DESIGN! 4.5 6R/3CF AT INLET)
OPEN LOOP) 350 - 400 GPM PER ABSORBER
NON-FIXATtO SLURRY TO LINED POND
CLARIFICATION FOLLOWED BY PONDING AND DISCHARGE TO RIVER
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
     IN CEDAR SPRINGS* GEORGIA,  THE GREAT SOUTHERN PAPER COMPANY OPERATES TWO BOILERS* EACH RATCD AT
500,000 LB/HR STEAM « 900 F AND  850, PSIG GENERATING A TOTAL OF 700,000 ACFM FLUE 6A8 AT 425 F.
THE BOILERS NORMALLY HUN AT NEARLY PEAK CAPACITY AND FIRE BARK AND PULVERIZED COAL MHICH HAS JX
MOISTURE, 12X ASH, l.SX SULFUR,  AND A HEATING VALUE OP 12,500 BTU/LB.  EACH BOILER BURNS APPROXI-
MATELY 20 TUNS/HR OF COAL AND BARK AND USES SOX EXCESS AIR.  A FUEL OIL BACK-UP SYSTEM IS ALSO
AVAILABLE.
     FLUE GAS FROM THE TdO BOILERS 18 FED TO TNO AINPOL VARIABLE THROAT VENTURI SCRUBBERS, BY FOUR
IDENTICAL 900 HP FANS.  EACH SCRUBBING UNIT INCLUDES A RADIAL VANE SEPARATOR (24 FT DIA X 45
FT HEIGHT) AND A STUB STACK.  PRESSURE DROP ACROSS THE SCRUBBER IS ABOUT 7 INCHES K.6.,
AND THE DESIGN S02 REMOVAL EFFICIENCY IS 0S-90X.  THE SCRUBBERS OPERATE WITH AN L/6 RATIO OF ABOUT 5
                        1
GAL/1000 ACF. THE INLET 802 CONCENTRATION OF THE FLUE GAS IS TYPICALLY 1000-1200 PPM AND THE
PARTICULATE LOADING IS 4.S GR/SCFO.
     SCRUBBER UNDERFLOW, CONTAINING FLYASH AND SODIUM SULFATE, GOES TO A COMMON STAINLESS STEEL
RECIRCULATION TANK (10 FT OIA X  Ib FT HEIGHT).  SULIDS CONTENT IN THE TANK IS 3-5X AND PH IS MAIN-
TAINED AT 3.5-b USING A 5X CAUSTIC HASTE STREAM FROM AN ONSITE OEMINERALIZER.  A BLEED STREAM OF  ,
ABOUT 600 GPM IS PUMPED TO AN ASH SETTLING POND nHICH HAS A VOLUME OF 110 ACRE-FT.
                                                90

-------
                                                                             STATUS TO APRIL  1979




                                      SECTION  9  (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON  INDUSTRIAL BOILERS



GREAT SOUTHERN PAPER CO.I CEDAR SPRINGS, 6EOR6IA  (CONTINUED)






     THE SCRUBBERS, SEPARATORS, RECIRCULATION TANK, AND STUB STACKS  ARE ALL STAINLESS STEEL.  THE



PIPING, KECIRCULATION PUMPS (3 AT 2400 GPM) AND SLUDGE PUMPS (2 AT 500 GPH) ARE RUBBER LINED.  THE




BLEED-OFF PIPING IS 316 SS.  ALL OTHER PIPING IS  RUBBER-LINED CARBON STEEL, EXCEPT MAKE-UP WATER



PIPING, WHICH IS UNLINED.




    REFER TO FIGURE 14-20 IN SECTION 14 FOR A DETAILED PROCESS FLOW  DIAGRAM OF THIS SYSTEM.








                                         OPERATING HISTORY



4TH OUARTER-1977    THE EXPANSION JOINT BETWEEN THE EXISTING STACK AND SCRUBBER HAD TO BE REPLACED




IN SEPTEMBER.  SOME INTERNAL WEAR WAS DETECTED ON THE PUMPS DUE TO ASH CONTENT.  EROSION AND PLUG-




GING PROBLEMS WITH THE PH PROBES HAVE BEEN ENCOUNTERED.  THE PLANT WAS IN PROCESS OF CHANGING THE



CONTROL PH AND MOVING THE PROBES.  TANKS AND NECESSARY EQUIPMENT TO  CONTROL THE PROPER PH ARE




EXPECTED TO BE COMPLETED IN A COUPLE OF MONTHS.   OME EROSION WAS DETECTED IN THE RECIRCULATION




LINES OF THE POWER BOILER SCRUBBER.  THE LINES AND SOME OF THE VALVES HAD TO BE REPLACED.








1ST, 2ND, 3RD OUARTER-1978    GREATER PH CONTROL  WAS ACHIEVED BY INSTALLING A CAUSTIC HOLD TANK AND



REGULATING THE FLOW FROM THAT TANK TO MAINTAIN A  CONSTANT PH IN THE  RECIRCULATION TANK.  THE RUBBER-




LINED PIPING HAS ERODED AND IS GRADUALLY BEING REPLACED WITH STAINLESS STEEL.  THE VENTURI SCRUBBER



AND SEPARATOR WERE INSPECTED FOR CORROSION AND FOUND fO BE IN GOOD CONDITION.








4TH OUARTER-1976    PROBLEMS HAVE BEEN EXPERIENCED WITH PACKINGS IN  ALL THE PUMPS.  A MECHANICAL




SEAL WAS TRIED AND LASTED 3 WEEKS.  NEW SEALS WILL BE INSTALLED, AND SINCE THERE ARE BACK-UPS FOR



ALL THE PUMPS IN THE SYSTEM, THIS SHOULD NOT CAUSE ANY DOWNTIME.  PLANS FOR 1479 INCLUDE UPGRADING




THE ASH HANDLING SYSTEM AND POSSIBLY INSTALLING A MIST ELIMINATOR IN THE  TOP OF THE SEPARATOR.




THE SOLIDS CONTfcNT IN THE HECikCULATEO LIQUOR WILL BE REDUCED BY INCREASING THE MAKE-UP WATER




INPUT AND THE BLEED-OFF RATE AT  THE RtCIRCULATION TANK.  ALSO, THE PRESENT BLEED LINE AND ASH PUMPS




MILL BE REPLACED WITH A GRAVITY  LINE.








1ST OUARTER-1979    PROBLEMS AttE STILL BEING ENCOUNTERED WITH THE PUMP SEALS.  A SEAL WATER PRESSURE




SWITCH IS BEING INSTALLED ON THE RECINCULATION PUMPS.  PRESENTLY, THE PUMPS ARE OPERATING NITH




CONVENTIONAL PACKINGS AND ARE ROTATED DAILY TO REPLACE MINGS.



    THE GRAVITY LINE TO THE SETTLING POND HAS BEEN INSTALLED.  AN ATTEMPT  IS BEING MADE TO GET



SOLIDS BELOW £1.   NEW MIST ELIMINATORS WILL NUT BE REQUIRED* AS SPIN VANES ARE PROVIDING ADEQUATE




OKOPLET REMOVAL.

-------
                                                                              STATUS  TU  APNIL   1979

                                       SECTION   9  (CONTINUED)

              PERFORMANCE  DESCRIPTION  FOR  OPERATIONAL  F60  SYSTEMS  Ow  INDUSTRIAL  BOILERS
   INSTALLATION  NAME

   INSTALLATION  LOCATION

   SOURCE  CHARACTERISTICS

   SOURCE  HATING

   NUMBEK  OF  SEPAHA1E FGO  UNITS

   NUMBER  OF  BUILEKS BEING CONTROLLED

   SOURCE  CAPACITY




   CONTROL SYSTEM VtNDOH

   CONTROL PROCESS

   NEN / RETROFIT

   STAHT-UP DATE

   CONTROL SYSTEM STATUS

   302 REMOVAL EFFICIENCY

   PARTICULATE REMOVAL EFFICIENCY

   HATER MAKE-UP

   SLUDGE  OR  BY-PRODUCT DISPOSAL

   CONTROL SYSTEM COST
ITT HAYUNIEK, INC.

FEKNANDINA BEACH, FLORIDA

BARK,OIL (2.OX - 2.SX SULFUR)

176,000 3CFM (T01AL - 4 BOILERS)

 2

 H

80 MM (EUUIVALENT)J TOTAL - 4 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 4000 SCFM x I EQUIVALENT MM.
THIS IS BECAUSE GAS f-LUn RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

NEPTUNE AIRPOL,  INC.

SODIUM HYDROXIDE SCRUBBING

RETROFIT

1975

OPERATIONAL

SOX - 65X (1,200 PPM AT INLET)

97X 11.7 GK/SCF AT INLET)

OPkN LOOP

WASTtHATER TREATMENT AND DISCHARGE TO TAILINGS POND

SEE SECTION 13 FUR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

    ITT RAYUNIER OPERATES AN AMMONIA-BASED SULFITE PULP MILL IN FERNANOINA BEACH, FLORIDA.  THERE

ARE FOUR PROCESS STEAM BOILERS TYPICALLY OPERATING AT APPROXIMATELY 00 TO 90X LOAD.  TWO ARE RATED

AT 125,000 LB/HR STEAM, ONE AT 100,000 LB/HR STEAM AND ONE AT 150,000 LB/HR STEAM.  ALL ARE RATED AT

600 PSI6.  THE FOUR BOILERS OPERATE IN THE FOLLOWING MANNER:

              NO. 1 - 100,000 LB/HR STEAM - FIRES FUEL OIL (NO. 6)

              NO. 2 - 125,000 LB/HH STEAM - FlhES A COMBINATION OF BARK AND NO. 6 FUEL OIL

              NO. 3 - SAME AS NO. 2

              NO. 4 - 130,000 LB/HR STEAM - FIRES FUEL OIL (NO. b)

    FLUE GASES LEAVING THE NUMBER TnO AND THREE BOILERS ENTER INTO SEPARATE MECHANICAL COLLECTORS

(BUELL CYCLONE COLLECTORS) FOR PARTICULATE REMOVAL OF ABOUT 97X (1.7 GR/SCF 
-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS



XTT RAVONIER,  INC.I FERNANOINA BEACH, FLORIDA (CONTINUED)





CHASED CAUSTIC IS USED AND THE CAUSTIC FROM THE BLEACHING OPERATION IS SOLO TO KRAFT MILLS.



CONTROL PH IS IN THE RANGE OF 5.5 TO 6.0.  THE LIQUID-GAS MIXTURE ENTERS A SEPARATOR (38 FT HIGH X



16.5 FT DIA.)  WHICH INCORPORATES SPIN VANES FOR LIQUID SEPARATION.  THE LIQUID DROPS TO THE BOTTOM



OF THE SEPARATOR INTO THE RECIRCULATION TANK.  THE GASES LEAVE THE TOP OF THE SEPARATOR AND LEAD



DIRECTLY TO THE STACK* EXITING AT A TEMPERATURE OF APPROXIMATELY 135 F.



    THE VENTURIS, SEPARATORS (INCLUDING SPIN VANES), SPENT LIQUOR PIPING AND HOLD TANKS ARE ALL



CONSTRUCTED OF 316L SS.



    REFER TO FIGURE 14-21 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.







                                          OPERATING HISTORY



4TH OUARTER-1977    PLANT REPORTED THAT BOILERS NO. Z AND 3 WERE OPERATING AT REDUCED LOADS,



EACH IN THE RANGE OF 75,000 - 90,000 LBS/HR STEAM.  THE SPENT CAUSTIC WAS NOT BEING



USED FOR SCRUBBING LIQUOR.  ITT WAS SELLING THE SPENT CAUSTIC TO KRAFT MILLS MHO USE IT



FOR THEIR SODA BASE.  CONDENSATE STEAM WAS BEING RECYCLED AND USED FOR SCRUBBING PURPOSES.



SOME EROSION HAS BEEN NOTED AT THE VENTURI THROAT.





ZND QUARTER-1978   THE PLANT WAS STILL UTILIZING CONDENSATE WATER FOR SCRUBBER LIQUOR.  APPROX-



IMATELY 3 TONS PER DAY OF SODIUM HYDROXIDE WAS BEING USED TO MAINTAIN PH.  THE ORIGINAL HOT WASTE



STREAM CAUSTIC WAS NOT USED FOR SCRUBBER PURPOSES, DUE TO PROCESS-RELATED PROBLEMS THAT OCCURRED.



SCRUBBER EFFLUENT MAS STILL BEING SOLD TO KRAFT HILLS.  THE SYSTEM HAS TWO SCRUBBERS, 'A' AND 'B*.



A-NOOULE WAS DOWN 4 WEEKS IN JUNE AND JULY BECAUSE OF AN F.D. FAN FAILURE, BELIEVED TO BE A RESULT



OF POORLY OPERATED MECHANICAL COLLECTORS.  NEW MECHANICALS WERE BEING INSTALLED TO PREVENT FURTHER



ABRASION.  THE PLANT REPORTED THAT SINCE JANUARY, SCRUBBER OPERABILITY HAD BEEN APPROXIMATELY 95*.







3RD OUARTER-1978    THE BOILER AND FGD SYSTEM OPERATED APPROXIMATELY 95X OF THE PERIOD.  THE



ONLY OUTAGE DURING THE PERIOD WAS BOILER-RELATED AND LASTED THKEE DAYS.  THE BEARINGS IN THE I.D.



FAN HAD TO BE REPLACED.







4TH OUARTER-1978    THE FGD SYSTEM DEMONSTRATED AN ESTIMATED 95X RELIABILITY.  A CRACKED FAN FOUNDA-



TION ON MODULE A CAUSED THAT MODULE TO BE NON-OPERABLE FOR 10 DAYS.  I-BEAMS WERE PLACED UNDER THE



FOUNDATION TO RESTORE SUPPORT.  AT THE SAME TIME, NEW SEALS WEKE PLACED IN THE DUST COLLECTOR TO



SLOW DOWN THE SEVERE EROSION PROBLEMS ON THE FAN.  THE FAN SHROUD HAS BEEN REBUILT SEVERAL TIMES;



THAT HAS THE SECOND FAN.  THE PLANT PLANNED TO INSTALL NEW DUST COLLECTORS SOMETIME IN APRIL.  UNTIL



THEN, INTERMITTENT DOWNTIME WAS EXPECTED.







1ST OUARTER-1979    THE FGD SYSTEM OPERATED CONTINUOUSLY THROUGHOUT THE PERIOD.  THE SYSTEM HAS NOT



BEEN SHUT DOWN SINCE THE REPAIRS ON THE FAN WERE COMPLETED, YIELDING A RELIABILITY VALUE OF 100X.







                                                93

-------
                                                                              STATUS TO  APKIL   1979
                                       SECTION   9  (CONTINUED)
              PERFORMANCE DESCRIPTION FOR  OPERATIONAL  F60  SYSTEMS  ON  INDUSTHUL BOILEHS
   INSTALLATION NAME
   INSTALLATION LOCATION
   SOURCE CHARACTERISTICS
   SOURCE RAT INS

   NUMBER OF SEPARATE F6D UNITS
   NUMBER OF BOILEHS BEING CONTROLLED
   SOURCE CAPACITY
   CONTROL  SYSTEM VENDOR
   CONTROL  PROCESS
   NEN  / RETROFIT
   START-UP DATE
   CONTROL  SYSTEM STATUS
   802  REMOVAL EFFICIENCY
   PARTICULATE REMOVAL EFFICIENCY
   MATER MAKE-UP


   8LUDCE OR BY-PRODUCT DISPOSAL
  CONTROL  SYSTEM COST
KERR-MC6EE CHEMICAL CUHP.
IRON*, CALIFORNIA

COKE/COAL/OIL  CO.SI - b.OX SULFUR)
490*000 SCFM (TOTAL - 2 BOILERS)
726,OUU ACFM 4 320 f (TOTAL - 2 BOILERS)
 2
 e

245 MM (64 MN ELECTRIC POHER. ANO THE BALANCE IS PROCESS
STEAM) TOTAL - 2 BOILERS
(FOR THIS KEPORT, UNLESS STATED OTHERWISE, 2000 SCFM * 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLOM RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
COMBUSTION EQUIPMENT ASSOC.
SODIUM CARBONATE SCRUBBING
NEN
JUNE, 1979
OPERATIONAL
9S«X (AT MAXIMUM LOADJN0)
98.5* (COLLECTED BY PRECEDING ESP'S)
OPEN LOOP! 125 GPM BURKITE SCRUBBING LIQUOR 147X NA2C03 AND
4U NA2S04)
HOLDING POND FUR EVAPORATION
SCRUBBER EFFLUENT 19 CLARIFIED AND THEN PUT INTO A MINERAL
DEPOSIT,
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
    KERR-MCGEE  CHEMICAL CORP. HAS A NEN 1.3 MM TON/Vtt SODA ASH PLANT AT TftONA, CALIFORNIA.  THE
PLANT. LOCATED  ALONG  THE SHORE OF SEARLE8 LAKE, IS THE LARGEST YET BUILT TO  YIELD SODA ASH BY DIRECT
CARBONAT ION  OF  BRINE  ANO MAS COMMISSIONED IN JUNE 1976.  THE PROCESSING INNOVATIONS* WHICH
HAVE  IMPROVED THE PLANT EFFICIENCY, INCLUDE CARBONATION UNDER 13.5 PSI PRESbUNE* USE OF A COAL-
FIRED POWER  PLANT, ANO RECOVERY OF C02 FROM THE FLUE GASES.
   THE PLANT HAS TMO  BOILERS, EACH PRODUCING 600,000 LB/HR STEAM AT 1SOO PSI.  THE STEAM IS INITIAL-
LY USED TO DRIVE TuO  32 MM NON-CONDENSING STEAM TURBINES FOR ELECTRIC POKER, THEN IS USED AS PROCESS
STEAM.  THE  TOTAL MH  EQUIVALENT IS ABOUT 245 MM.  EACH BOILER BURNS A MIXTURE OF MESTERN COAL
(•.7 PERCENT SULFUR)  ANO PETROLEUM COKE (5.5 PERCENT SULFUR).  THE HIGH SULFUR COKE IS MIXED MITH
INC COAL IN  ORDER TO  IMPROVE THE PARTIAL IONI2ATION AND THEREFORE IMPROVE FLY-ASH COLLECTION IN THE
ESP WHICH OPERATES ON THE COLO SIDE OF THE PREHEATER AT 96.5 PERCENT EFFICIENCY AND 300 F.  THE FLUE
CAS FLOH RATE FROM EACH BOILER IS 363*000 ACFM AT 320 F ANO MAY CONTAIN S02 BETWEEN 335 TO 5945 PPM

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9  (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL F6D SYSTEMS ON  INDUSTRIAL BOILERS



KERR-MCGEE CHEMICAL CORP.) TRONA. CALIFORNIA (CONTINUED)






DEPENDING UPON THE FUEL.  THE AIR POLLUTION REGULATIONS,DICTATE THAT EACH BOILER MAY RELEASE NOT



MORE THAN 10 LBS/HR PARTICULAR. 200 LBS/HR OF 302 AND  uo LHS/HR OF NOX.



    THE FLUE GASES ARE SCRUBBED BY  THE END LIQUOR FROM  THE SODA ASH  PLANT IN THO SCRUBBERS



(30 FT UIA X 35 FT HIGH EACH) WHICH ARE MILD STEEL VESSELS WITH FLAKE LINING AND THREE 3I7L 88 SIEVE



TRAYS.  THE TOP TRAY RECEIVES PLAIN WATER WHEREAS THE SECOND THAT RECEIVES THE RECIRCULATIN6 LIQUOR



AT PH OF t> - 6.5.  THE SPENT LIQUOR FROM THE BOTTOM OF  THE SCRUBBERS IS RECIRCULATEO BY RUBBER



LINED PUMPS, FRESH END-LIQUOR IS ADDED DIRECTLY TO THE  R£CIRCULAT10N\ LINE.  A BLEED OFF STREAM IS



CONTINUOUSLY TAKEN BACK TO THE SALT PONDS.



    THE BOILER I.D. FANS (1600 HP)  FORCE THE GASES THROUGH THE SCRUBBERS AND EXPERIENCE 6 IN. H6



PRESSURE DROP.  THE FANS HAVE MILD  STEEL CASINGS.  THE  DOWNSTREAM DUCTWORK IS MILD STEEL WITH FLAKE



LINING WHEREAS THE STACK IS CONCRETE WITH FRP LINER.  AMBIENT AIR IS HEATED IN AN EXTERNAL



STEAM HEATER AND MIXED WITH THE EXIT FLUE GASES TO INCREASE THE TEMPERATURE, FROM 125 F TO ABOUT



175 F.  AT MAXIMUM LOADING, THE SCRUBBEHS HAVE A 802 REMOVAL EFFICIENCY OF 96 PERCENT.  THE SCRUBBED



FLUE GASES ARE PROCESSED THROUGH THO MONOETHANOLAMINE (MEA) PLANTS FOR EXTRACTION OF C02.  EACH MEA



PLANT WILL PRODUCE 300 TONS/DAY OF  C02 AND WILL BE THE  MAIN SOURCE OF MAKEUP C02 FOR THE CARBONATION



STEP.



    REFER TO FIGURE 14*22 IN SECTION 14 FDR A DETAILED  PROCESS FLOW  DIAGRAM OF THIS SYSTEM.







                                         OPERATING HISTORY



1ST QUARTER-1978   THE MAJOR CONSTRUCTION WORK NAB OVER.  PRECOMMISSIONING ACTIVITIES WERE UNDERWAY.



THE PLANT WAS PROJECTED TO GO ONSTREAM BY APRIL I, 197S.








2ND OUAHfER-1978   THt FGO SYSTEM WAS COMMISSIONED DURING THE REPORT PERIOD. THE BOILERS WERE RUN



TO FULL CAPACITY WITH IOOX UIL FEED.  COAL AND COKE WERE USED UP TO  SOX AS THE FUEL.  THE MAJOR



STARTUP PROBLEM WAS TKAY TIEOUwN.   THE POLYPROPYLENE SIEVE TRAYS WERE NOT STRONG ENOUGH TO TAKE THE



LOAD OF INVENTORY LIQUID.  THESE WILL BE REPLACED BY 316L SS OK A HIGHER GRADE ALLOY.  THE PRESENCE



OF CHkOMATE IONS IN THE MAKEUP NATEK CAUSED SOME CONCERN.








3RD QUARTfcR-1970   THERE HERE ONLY  2 BOILER AND FGD OUTAGES DURING THE PERIOD.  BOTH OUTAGES WERE



FOR REPLACING THE SIEVE TRAYS IN THE ABSORBER MODULES.  TRAYS WERE REPLACED BY 317L SSI IN THE



FIRST MODULE DURING A 5-OAY OUTAGE  IN AUGUST, AND IN THE SECOND DURING A 4-DAY OUTAGE IN SEPTEMBER.



COAL AND COKE WERE USED FOR 90 TO 95 PERCENT AS THE FUEL.  OIL WAS NOT USED AT ALL* WHILE GAS MAS



AVAILABLE ONLY AS A bACK-UP.







4TH QUARTER-1978    THE 317L SS TRAYS ARE WORKING QUITE WELL.  THE PROBLEM KITH THE POLYPROPYLENE



SIEVE TRAYS WAS NUT THAT THEY WERE  NOT STRONG ENOUGH TO SUPPORT THE LOAD OF INVENTORY
                                                95

-------
                                                                             STATUS TO APRIL  1979




                                      SECTION  9 (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS




KERR-MCGEE CHEMICAL CORP.; TRONA. CALIFORNIA (CONTINUED)






LIQUID AS REPORTED IM THE 2ND QUARTER I
-------
                                                                             STATUS  TU  APRIL   1979

                                      SECTION   9  (CONTINUED)

             PERFUKMANCE  DESCRIPTION  FOR  OPERATIONAL  FGU  SYSTEMS  ON  INDUSTRIAL  BOILERS
  INSTALLATION  NAME

  INSTALLATION  LOCATION

  SOURCE  CHARACTERISTICS

  SOURCE  RATING

  NUMBER  OF  SEPARATE  FGO  UNITS

  NUMBER  OF  BOILERS BEING CONTROLLED

  SOURCE  CAPACIIY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW /  RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  802 REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  SLUDGE OH BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
MEAD PAPERBOARD CO.

STEVENSON, ALABAMA

OIL U.5X - 3X SULFUR)

100,UOO SCFH (TOTAL - 2 BOILERS)

 1

 2

SO MW (EQUIVALENT)! TOTAL - 2 BOILERS

IFOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM = 1 EQUIVALENT MK.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

NEPTUNE AIRPOL, INC.

SODIUM CARBONATE SCRUBBING

NEn

1975

OPERATIONAL

95* 11,500 PPM o) INLET)

90*

ALKALINE  SULF1TE/6ISULFITE RECYCLED TO PULP PROCESS

RECOVERED SOLUTION  USED AS MAKE-OP  TO COOKING LIOUOH  IN  PULP

MILL.

SEE SECTION  13 FOR  OEIAILEU ECONOMIC  INFORMATION
                                       BACKGROUND INFORMATION

     THE MEAD PAPERBOARQ COMPANY IN STEVENSON, ALABAMA, IS A NEUTRAL SULFITE PULP MILL WITH A 500

TON/DAY POLP PRODUCTION RATE.  THE MILL HAS A CHEMICAL RECOVERY SYSTEM THAT ABSORBS S0£ FROM THE

eiLLERUO REACTOR.  EFFLUENT FROM THE RECOVERY SYSTEM FLOnS BACK TO THt PULPING OPERATION.

   ELSEWHERE ON-SITE, AN AIRPOL INDUSTRIES ABSORBER TOWER CONTROLS PARTICULATE AND S02 EMISSIONS

FROM TWO OIL-FIRED U.bX - S.tU SULFOR) COMBUSTION-ENGINEERING PACKAGE BOILERS EACH PRODUCING

175,000 Lb/HR STEAM AT 600 PSI.  tHE BOILERS  ARE TYPICALLY OPERATED AT 80X OF MAXIMUM LOAD.  FLUE

GAS VOLUME INTU THE SCROBBER IS 173,000 ACFM  id 450 F.  HOT GASES PASS THROUGH A STAINLESS STEEL

VENTUR1/UUENCH SECTION FOR COOLING AND INITIAL 802 REMOVAL.  THE FLUE GAS THEN ENTERS THE BOTTOM OF

THE ABSORBER SECTION ANU PASSES UP THROUGH THREE BUBBLE-CAP TRAYS.  A SODIUM CARBONATE SOLUTION IS

INTRODUCED THROUGH A DANK OF EIGHT, 1.5-INCH  NOZZLES CONSTRUCTED OF 316L SS AND SPIN VANES.  THE

SOLUTION IS AOOED TU tHE REC1RCULATION LINE ON THE SUCTION SIDE OF THE RECIRCULAUON PUMP AT A HATE

OF 20-25 tPM.  SCRUbBER EFFLUENT, MOSTLY SODIUM SULFITE,  IS SENT TO THE MILLS PULPING OPERATIONS BY

A CONTINUOUS bLEED-OFF LINt  AT 30-35 GPM FOR  EVENTUAL 'USE  IN THE DIGESTERS.

    MILL WATER IS AOOED TO THE RECIRCULATION  TANKS WHEN NEEOED TU COVER EVAPORATION LOSSES.  IT IS

NOT A CONTINUOUS FLU*.  EVAPORATION LOSSES ARE ESTIMATED  TO HE APPROXIMATELY  100  GPM.  THE RECIBCUL-

ATION RATE TO THE VENTURI  IS APPROXIMATELY 2000 UPM AND THE RtCIRCULATION RATE TO THE ABSORBER IS
                                                 97

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS



MEAD PAPERBOARD CO.I STEVENSON* ALABAMA (CONTINUED)





ABOUT 1200 6PM.  THE GAS EXITS THROUGH A FIBERGLASS STACK AT APPROXIMATELY 140 F,



    THE PH MONITORING SYSTEM CONSISTS OF A FIBERGLASS BOX MOUNTED ON THE RECIRCULATION TANK.  OVER-



FLOW FROM THE TANK TO THE BOX INSURES CONTINUOUS FLOW.








                                        OPERATING HISTORY



   EARLY OPERATIONS



    THE 302 SCRUBBING SYSTEM MAS DOWN FROM MARCH THROUGH JULY 1976 DUE TO ABRASION PROBLEMS.  THE



ABRASION MAS CAUSED PARTIALLY BY HIGH STREAM VELOCITY THROUGH THE EXISTENT VENTURI PARTICULATE



SCRUBBER INTO THE 802 SCRUBBER.  SODIUM CARBONATE AND CARBON PARTICLES THAT HAD NOT 60NE INTO SOLU-



TION ALSO HERE VERY ABRASIVE TO THE 302 SCRUBBER LINING.  IN ADDITION* THE ORIGINAL GLASS-FLAKED



LINER (5 MM THICK) MAS EXPERIENCING STRESS CRACKING.



    THE HIGH VELOCITIES INTRODUCED BY THE VENTURI MERE ELIMINATED BY REMOVING THE PARTICULATE



VENTURI SECTION OF THE SYSTEM.  THE GLASS-FLAKED LINING MAS PATCHED WITH 860*000 WORTH OF CARPENTER



20 LINER.  THESE CORRECTIVE ACTIONS HELPED FOR A WHILE* BUT AS IT TURNED OUT, THE CARPENTER 20 WAS



NOT INSTALLED PROPERLY AND SOLUTION HAS GETTING BETWEEN IT ANO THE MILD STEEL SHELL.  IT MAS FINALLY



DECIDED TO INSTALL NEW RUBBER LINING INSIDE THE ENTIRE SCRUBBER* INCLUDING THE SPIN VANE8* AT A COST



OF 1150*000.  TO PREVENT ANY HEAT PROBLEMS* ADDITIONAL NOZZLES MERE INSTALLED.  TO DATE* NO MAJOR



PROBLEMS HAVE OCCURRED MITH THE RUBBER LINING.



    SCRUBBER MAINTENANCE IS PERFORMED WHENEVER MILL OPERATIONS CEASE FOR ROUTINE PLANT MAINTENANCE



MHICH OCCURS SEVERAL TIMES PER YEAR.  THE PH CONTROL SYSTEM RECEIVES CONTINUING MAINTENANCE ANO THE



PH PROBES ARE CLEANED ONCE PER MEEK.



    REFER TO FIGURE 14-23 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.







                                          OPERATING HISTORY



4TH QUARUR-1977    MINOK EMBRITTLEMENT, DUE TO LOCALIZED HIGH TEMPERATURE* HAS BEEN DETECTED ON THE



LINING SURFACE.  SOME METAL* NOZZLES* AND RUBBER HVAVE BEEN REPLACED.







2ND OUARTER-1976    THE PLANT MAS DOWN 12 DAYS IN JUNE FOR A MAJOR PAPER MACHINE UPDATE* AND THE



BOILERS MERE DOWN 9 DAYS DURING THAT PERIOD.  DURING DUILER DOWNTIME* THE RUBBER LINERS IN THE



ABSORBER MODULE MERE REPAIRED AND MODIFICATIONS MERE MADE AT THE INLET TO THE ABSORBER* REDIRECTING



AIR FLON TO MINIMIZE FURTHER FLYASH ABRASION OF THE LINERS. THE PLANT REPORTED AN OPERABILITV OF



100* FOR THE FGD SYSTEM.







3RD 8UAHTER-19T8    AN AVAILABILITY OF 100X MAS REPORTED FOR THE FGO SYSTEM DURING THIS PERIOD*







4TH OUARTER-1978    THE RUBBER LINER IN THE ABSORBER AND THE DEFLECTOR SHIELD AT THE INLET OF THE
                                                96

-------
                                                                             STATUS TO APRIL  197*




                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS



MEAD PAPERBOARD CO.} STEVENSON, ALABAMA (CONTINUED)






ABSORBER MERE HOLDING WELL.  THE PLANT REPORTED 100X RELIABILITY FOR THE SCRUBBER.  ONE OF THE




BOILERS WAS DOWN FOR 24 HOURS AND THE OTHER MAS DOWN FOR 48 HOURS IN NOVEMBER FOR THE REPLACEMENT




OF SEALS AND PREHfcATERS.  THE SCRUBBER MAS CHECKED AT THAT TIME.  NORMALLY THE SCRUBBER 13 INSPECTED



NO MORE THAN TWICE A YEAR AND THESE INSPECTIONS ARE DURING SCHEDULED MILL SHUTDOWNS.  FOUR NOZZLES



IN THE ABSORBER WERE REPLACED ON DECEMBER 1ST* WITHOUT ANY DOWNTIME.




     THE PLANT WAS CONSIDERING CHANGING THE PH CONTROLLED MAKE-UP LIQUOR FEED TO A FLOW CONTROLLED



FEED BECAUSE THE PH PROBES WERE HARD TO KEEP CALIBRATED ANO HERE UNRELIABLE.








1ST QUAKTER-1979    NO F60-RELATED PROBLEMS MERE ENCOUNTERED DURING THE PERIOD.  A SHUTDOWN IS




SCHEDULED FOR APRIL AT WHICH TIME THE UNIT WILL BE INSPECTED.

-------
                                                                              STATUS  TO APRIL   1979

                                       SECTION  9  (CONTINUED}

             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SY3TtM3  ON  INOUSTRIAL BOILERS
  INSTALLATION

  INSTALLATIUN LOCATION

  SOURCE CHARACTERISTICS

  SUUHCE HATING

  NUMbEK OF SEPARATE FGO UNITS

  NUMBER UF bUILfcHS btlNli CONTNULLEU

  SUUHCE CAPACITY
  CONTROL SYSTEM V£MOUK

  CONTROL PROCESS

  NEW / RETROFIT

  STAKT-UP OATE

  CONTROL SYSTEM STATUS

  302 REMOVAL EFFICIENCY

  HATEH MAKE-UP

  SLUDGE UK BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
MINN-OAK FARMER'S CO-OPERATIVE

HAHPETOfK, NORTH DAKOTA

LIGNITE 11.OX SULFUH)

164,000 SCFM (TOTAL - 2 BOILERSJ

 2

 2

02 Mtl (EQUIVALENT] ; TUTAL - 2 BUILEKS

TWO BOILERS, EACH H £75,000 L83/HK STEAM (250 PSI6 - OSS F)

(FOR THIS REPORT, UNLESS STATED OTHERWISE. 20UK 3CFM • 1 EQUIVALENT Hft.
THIS 19 BECAUSE GAS FLO* HATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

KOCH ENGINEERING

AMMONIA SCRUBBING

RETROFIT

JUNE, 1977

OPERATIONAL

TESTS INCONCLUSIVE.

200 GPM AMttUfclACAL HASTE STREAM

HASTMATER TREATMENT

BLEED STREAM GOES TO AN ACTIVATED SLUDGE SYSTEM 9 160 GPM

ANAEROBIC DIGESTION, FOLLOWED BY AN OPEN POND,  FOLLOWED BY

AEROBIC DIGESTION.

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND INFUMMATION

    MINN-DAK FARMtR'S CO-OP. HAS  A  SUGAR FACTORY AT MHPETUN, NORTH DAKOTA.  THERE ARE T*0 BOILERS,

EACH KITH A CAPACITY OF 275,OUU LBS STEAM/HR AT 250 P31G AND 4SS F.  t»CH BOILER GENERATES 125,000

ACFM OF FLUE GAS AT 350 F.  THE FUEL BURNED IS IS SULFUR LIGNITE.  SULFUR DIOXIDE REMOVAL IS EFFECT-

ED BY AN AMMONIA MASTE STREAM FROM  AN  ON-SITE PROCESS ADDED TO THE RECIRCULATING SCRUBBER LIQUOR.

    KOCH ENGINEERING HAS SUPPLIED THO  VARIABLE THROAT VENTURI SCRUBBERS NITH OPEN ENDED PIPE INLETS

FOR SCRUBBING LIOUOH.  THE SYSTEM HAS  PRIMARILY DESIGNED FOR PARTICULATE CONTROL.  INLET CONCENTRA-

TIONS OF 302 AMD PARTICULATE ARE  76-195 LB/HR AND .3-.4 GR/SCF RESPECTIVELY.  OUTLET CONCENTRATIONS

OF SOZ AND PAHTICULATE ARE 10-37 LB/HR  AND .027-.058 GK/SCF RESPECTIVELY.  THE GAS FROM EACH VENTURI

IS ROUTED THROUGH A CHEVRON-TYPE MIST  ELIMINATOR AND ONE 7 FOOT X ISO FOOT STACK.  THE PRESSURE DROP

ACROSS EACH SCRUBBER IS 11 INCHES M.G.  THE SCRUBBER LIQUOR IS RECIRCULATED AT A RATE OF 2000 GPM

FROM A CONCRETE TAB-LINED RECIRCULATION PIT APPROXIMATELY  10 FT X 10 FT X 10 FT.  THE RECIRCULATION

PUMP IS RATED Al 75 HP AND 3UOO GPM.   ANOTHER PUMP IS KEPT ON STANDBY.  SCRUBBER BLONOOMN 13 «8b 6PM

TO AN AEROBIC DIGESTER.  AFTER THE  DIGESTER THE HASTE STREAM GOES TO Ah OPEN POND* THEN AN AEROBIC

DIGESTER, THEN AGAIN TO A POND.
                                               100

-------
                                                                             STATUS TO APRIL  1979




                                      SECTION  9 (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL F6D SYSTEMS ON INDUSTRIAL BOILERS




MINN-OAK FARMER'S CO-OPERATIVE) WAHPETON, NORTH DAKOTA  (CONTINUED)






    THERE ARE A TOTAL OF FIVE PONDS ON SITE* FOUR WASTEWATER AND ONE MAIN RESERVOIR.  THE FOUR




MASTEMATER PONDS ARE USED INTERCHANGEABLY FOR MAKE-UP AND WASTE DISPOSAL.  MAKE-UP TO THE RECIRCUL-




ATION TANK IS 500 GPM NHERE PH IS MAINTAINED AT APPROXIMATELY 5.4.  WHEN ADDITIONAL MAKE-UP IS




REQUIRED, IT IS OBTAINED FROM THE BAROMETRIC CONDENSORS.  THE BAROMETRIC CONDENSER HATER IS THE



MAKE-UP HATER THAT CONTAINS THE AMMONIACAL WASTE WASTE  WHICH REMOVES S02.  THIS MAKE-UP IS NUT A




CONTINUOUS FLOW.



    DEMISTER WASH WATER IS ALSO BAROMETRIC CONDENSOR WATER  AND IS A 250 GPM SPRAY EVEKY 8 HOURS.




THE PUMPS USED FOR PUMPING MAKE-UP FROM  THE PONDS AND SCRUBBER BLOWDOWN ARE LOCATED IN A CENTRAL




PUMPHOUSE.  THERE ARE SEVERAL PUMPS WHICH ARE USED  INTERCHANGEABLY.  00 GPM MATER LOSS TO THE




ATMOSPHERE THROUGH THE STACK HAS BEEN CALCULATED, BUT NEVER MEASURED.



    THE SCRUBBERS AND THE LIQUOR INLET PIPES ARE MADE OF 316L S3, THE DEMISTER AND STACK ARE 316 SS,




AND THE RECIRCULATING PIPING IS FIBERGLASS.  THE TOTAL  PURCHASE COST OF THE EQUIPMENT MAS $300,000




IN 197? DOLLARS.  INITIALLY THE SYSTEM WAS DESIGNED TO  USE  A LIME SLURRY OF PH 10.0 AS THE SCRUBBING



LIQUOR.  HOWEVER, DURING THE FIRST SIX WEEKS OF OPERATION,  NUMEROUS PLUGGING  AND SCALING PROBLEMS



OCCURRED.  HENCE* PLANT PERSONNEL BEGAN  USING THE AMMONIA-RICH WASTE STREAM FROM ANOTHER ON-SITE




PROCESS IN EARLY 1976.



    EACH YEAR* THE PLANT ONLY OPERATES FROM SEPTEMBER - FEBRUARY.   THIS  IS THE BEET SUGAR PRODUCTION




PERIOD.  DURING THE REMAINDER OF THE  YEAR, PRODUCTION DISTRIBUTION  IS  THE MAIN PLANT  ACTIVITY.



    REFER TO FIGURE 14-24 IN SECTION  14  FOR A DETAILED  PROCESS FLOW DIAGRAM OF THIS SYSTEM.








                                          OPERATING HISTORY




3RD QUARTER-1976    THE FGD SYSTEM BEGAN OPERATIONS FOR THE 1976-1979  SEASON  ON  SEPTEMBER 12.   NO




MO-RELATED PROBLEMS OCCURRED.  THE  WASTE TREATMENT HAS BEEN MODIFIED  TO  INCLUDE AN ANAEROBIC




DIGESTER FOLLOWED BY AN OPEN POND AND AN AEROBIC DIGESTER.








«TH OUARTER-1976    EXCESSIVE HEAT LOSS  WAS A PROBLEM FOR  THE  DIGESTERS.   THEY WERE CURRENTLY  ONLY




PARTIALLY ENCLOSED.  PLANS WERE BEING MADE  TO ENCLOSE MORE  OF  THE WASTE  TREATMENT  FACILITIES.   OTHER




WISE, THE FGD  SYSTEM PERFORMED  WELL  FOR  THE QUARTER. PLANT PERSONNEL  FELT MOST  OF  THEIR  INITIAL




PROBLEMS HAD BEEN SOLVED.








1ST OUARTER-1979    THERE WAS  ONE MINOR  FGD RELATED SHUTDOWN DURING THE  QUARTER  TO CLEAN  OUT  THE




BOTTOM  OF THE  STACK.   A PROBLEM WITH EXCESSIVE  HEAT AT  THE  DIGESTERS  STILL PERSISTS.   CURRENT  PLANS




CALL FOR MODIFICATIONS  TO ALLEVIATE  THE  PROBLEM THIS SUMMER.
                                                101

-------
                                                                             STATUS  TO APRIL  1979
                                      SECTION  t  (CONTINUED)
             PERFORMANCE DESCRIPTION FUH OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBE* OF SEPARATE FGO UNITS
  NUMBER OF BOILERS bElNS CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENUvJk
  CONTROL PROCESS
  NEH / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  S02 REMOVAL EFFICIENCY
  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
MOBIL UIL COMPANY
SAN AttUOt CALIFORNIA
OIL 12.OX - 2.25X SULFUK)
175,000 SCFM (TOTAL - 58 BOILERS)
28
28
91 MM (EQUIVALENT); 800 MM BTU/HR: TOTAL - 26 BOILERS
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM a 1  EQUIVALENT MN.
THIS IS BECAUSE GAS FLOW RATE IS THE PhlMAKY FACTOR IN MODULE SIZING.)
IN-HOUSE DESIGN
SODIUM HYDRUXIOE SCRUBBING
RETROFIT
1974
OPERATIONAL
90X UbOO PPM • IHLtT)
HOLDING POND FUR EVAPORATION
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND INFORMATION

     THE MOBIL UIL COMPANY HAS AN UIL SITE IN SAN ARDO, CALIFORNIA MHtRE 2B STEAM GENERATORS ARE
USED TO FORCE OIL OUT OF HCLL3 BY A DEEP NELL STEAM INJECTION PROCESS.  T«t FUEL USED IS CRUDE OIL
HITH 2 - 2.5* SULFUR.  EACH STEAM GENERATOR IS FOLLOWED bY AN INDIVIDUAL FGD SYSTEM DESIGNED BY
IN-HOUSE ENGINEERING.  THE UNITS EXPERIENCED STARTUP IN THE PERIOD FKOM 1973 THROUGH 197«.
    THEME ARE TNO SIZES OF STEAM GENERATORS* 22MM BTU/Hft C20 UNITS) AND 5VM* BTU/HR 16 UNITS).
THE SMALL UNITS GENERATE BfOOO ACFM, ANtl THE LARGE UNITS 18,000 ACFM.  THE GASES ARE
SCRUBBED BY A LIQUUK CONSISTING OF NAOH AND ALKALINE UIL FIELD MASTENATER INA2COJ).  THE PROCESS IS
ONCE-THROUGH AND PH VALUES OF 8.0 AND b.O ARE MAINTAINED AT THE INLEI AND UUTLET OF THE SCRUBBERS,
RESPECTIVELY.  THE SPENT LIUUOfi FROM THE BOTTOM OF THE SCflUBeEfcS IS DISPOSED OF IN THE NASTENATER
DISPOSAL ZONE.  THEKt IS NO RECYCLE FRUM THE DISPOSAL ZONE.  THfc LIQUOR .FLOW NATES TO THE TNO SIZES
OP THE SCRUBBERS ARE 75 GPM AND 200 6PM.  THE SCRUBBER SIZES ARE 4 FT DIAMETER X 20 FT HIGH, AND
6.5 FT DIAMETER X 25 FT HIGH.  EACH SCRUBBER HAS THREE V-SHATE TYPE TRAYS.  THE I.D. FANS ON EACH
SCRUBBER EXPERIENCE 3 - 4 IN. N.6. PRESSURE OHUP.  THE 802 REMOVAL EFFICIENCY OF THE PROCESS IS 90
PERCENT KITH AN INLET CONCENTRATION OF 1300 PPM.  CHEVRON-TYPE MIST ELIMINATORS ARE USED.
    THE SCRUBBERS ARE 3161 SS AND THE TRAYS 316 SS.  THE INLET DUCTWORK IS CARBON STEEL UP TO THE
ECONOMIZERS AND THEN 316L 83.  THE OOMNSTHEAM DUCTNOKK IS FIBEKSLASS AND THE 1.0. FANS ARE CAHBON
BTEEL KITH 316L SS LINING ON THE CASING.  THE STACKS ARE FIBERGLASS.  THE FLUE GASES ARE NOT REHEAT-
                                               102

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS
MOBIL OIL COMPANY; SAN ARDO» CALIFORNIA (CONTINUED)
ED ANO CANNOT BE BYPASSED.  THE MIST ELIMINATORS, ORIGINALLY 316L 38, HAVE BEEN LINED WITH PHENOLIC
EPUXY RESIN TO COMBAT CORROSION.
    KEFtR TO FIGURE 14-26 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS ST3TEM.

                                        OPERATING HISTORY
    INADtOUATfc MIST REMOVAL HAS RESULTED IN CORROSION OF THE I.D. FAN IMPELLER* BLADES* AND HUBS,
WHICH NtEP REPLACEMENT EVERY YEAH.  THE HIGH CHLORIDE CONTENT IN THE NASTEHATER IS THE PRIMARY CAUSE
OF PITTING OF Sb MATERIAL.
JHD OUAHTER-197B    FOK THIS PERIOD. THERE MAS NO MAJOR DOWNTIME REPORTED AS A RESULT OF EQUIP-
MENT UR PHUCE3S FAILURE.  RELIABILITY HAS ESTIMATED AT AbOUT 90*.  A BECKMAN PH CONTROL UNIT WAS
INSTALLED ON A SCRUBBING UNIT WITH PLANS TO ADD MORE CONTROLLERS.

OTH QUAHTEK-197B    Tht I.D. FANS AHt ALSO LINED WITH EPUXY RESIN TO REDUCE CORROSION.  THE BECK-
MAN PH CONTROLLER HAS PERFORMED WELL AND SEVERAL MORE OF THESE DEVICES HAVE BEEN INSTALLED.  THE
AVERAGE AVAILABILITY OF AN  FGD SYSTEM WAS ABOUT 95 PERCENT.

1ST QUARTER-1979    MOBIL HAS DECIDED TO OPERATE ONLY 9 SMALL STEAM GENERATORS  (22 MM BTU/HR EACH)
FOR MOST OF THIS  YEAR.  MOBIL CLAIMS THAT THIS HAS HAS BEEN THE RESULT OF "LOWER-TIER" PRICES
SANCTIONED FOR MOST OF  THEIR OIL, WHICH MAKES  IT UNECONOMICAL TO PRODUCE THE OIL BY STEAM FLOODIN6.
                                                103

-------
                                                                              STATUS  TO APRIL   1979
                                       SECTION  9  (CONTINUED)
              PERFORMANCE  DESCRIPTION  FUR  OPERAIIONAL  FGU  SYSTEMS  ON  INDUSTRIAL  BOILERS
  INSTALLATION  NAME
  INSTALLATION  LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBER OF SEPARATE FGU UNITS
  NUMdER OF BOILERS bEI*U CONTROLLED
  SOURCE CAPACITY


  CONTHUL SYSTEM VENUUR
  CONTROL PROCESS
  NEM / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  SO2 REMOVAL EFFICIENCY
  PARTICULATE REMOVAL EFFICIENCY
  MATER MAKE-UP
  SLUDGE UK BY-PRODUCT OISPOSAL
  CONTHUL SYSTEM COST
NEKUUSA PAPERS, INC.
ASHUUHN, ARKANSAS
COAL (IX - 1.5X SULFUR)
111,000 SCFM (TOTAL - 1 BOILER)
 i.
 I
105 ** (EUUIVALENT); DESIGN - 5UO,UUO LB/HR STEAM
(FOR THIS REPORT, UNLESS STATED OTHERWISE* £000 SCFM = 1 EQUIVALENT MW.
THIS IS BECAUSE UAS FLO* RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
NEPTUNE AIRPOL, INC.
CAUSTIC SCRUBBING
NEW
FEBRUARY, 1976
OPERATIONAL
9u«X (600 PPM a) INLET)
98X - 99X (1.42 GH/SCF AT INLET)
OPEN LOOP
ALKALINE SULFITE/BISULFITE RECYCLED TO PULP PROCESS
SU2 RECOVERED FROM SODIUM SULFITE/SULFATE LIQUOR AND RE-
CYCLED TO PULPING PROCESS.
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND INFORMATION
    THE NEKUUSA-EDNARDS PAPER PULP MILL IN  ASHOONN. ARKANSAS OPERATES A SINGLE  105 Mw EQUIVALENT
STEAM BOILER F1REU rtlTM CUAL UR FUEL OIL.   THE BOILER IS DESIGNED FOR 500,000 LB/HR STEAM AT 650
PSI.  THE COAL HAS 1-1.bX SULFUR AND A  HEATING VALUE OF 12,000 UTU/LB.  IT IS BURNED AT A RATE OF 27
TON3/HH.  THE BOILER IS OPERATED CONTINUOUSLY AT (24 HRS/DAY) 40X TO bOX LOAD.
    T«0 AIRPUL VARIABLE THROAT VENTURl  SCRUBBERS ARE DESIGNED TO REMOVE BOTH SULFUR DIOXIDE AND
PARTICULATE AT AN AVERAGE PRESSURE DROP OF  14-16 INCHES N.G.  IHE INTENT OF NEKOOSA-EOftAKDS MAS TO
MAKE, FROM THE SCRUbbER EFFLUENT, SALTCAKE  HHlCH WOULD HE USED AT THE MILL.  EACH VENTURl IS FOLLOW-
ED BY A CYCLONIC SEPARATOR.  THE SEPARATORS ARE MILD STEEL WITH FLAKEGLASS LININGS.  EACH SCRUBBER
HANDLES HALF OF THE INCOMING FLUE GAS,  THE  TOTAL AMOUNT OF GAS BEING 325,000 ACFM AT 355 F.  THE
INLET SOe CONCENTRATION IS TYPICALLY 600 PPM MlTH A PARTICULATE LOADING OF 1.42 GR/SCF.  SCRUBBING
LI8UOR IS REC1HCULATED AT A RATE Of 2,000 GPM THROUGH PUMPS RATED AT 2,200 GPM.
    THE TnO HECIKCULATION TANKS ARE MILD STEEL AND ARE LINED.  THEIR SIZE IS ESTIMATED TO BE 15 FEET
HIGH X 10 FEET IN DIAMETER.  BLOMDOHN FROM  THE RECIRCULATIUN TANKS IS 300 GPM THROUGH PUMPS RATED AT
300 GPM.  FROM THE REC1HCULATION TANKS, THE BLOrtOONN GOES TO AN ASH POND, THEN A STABILIZATION POND
AND FINALLY THE RIVER.  SCRUBBER UNOERFLOH  CONSISTS OF FLYASH AND A SOLUTION OF NA2S03/S04.
                                               104

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)



            PERFORMANCE  DESCRIPTION FOR OPERATIONAL F6D SYSTEMS ON INDUSTRIAL BOILERS



NEKOOSA  PAPERS,  INC.;  ASHDOWN,  ARKANSAS (CONTINUED)






    CAUSTIC  IS USUALLY OBTAINED AS A WASTE STREAM AFTER THE PULP BLEACHING STAGE.  II IS USED AT A



RATE OF  500-600  GPM,  OR 12 LB/MIN OF SODIUM HYDROXIDE AND IS ADDED TO THE RECIRCULATION TANK,




PURCHASED  CAUSTIC  IS  OCCASIONALLY USED.  IT IS USED AS A SOX SOLUTION! EXACTLY THE HAY IT IS PUR-




CHASED.  THE USAGE RATE IS 1  TO 4 GPM AND IT IS INJECTED ON THE SUCTION SIDE OF THE RECIRCULATION




PUMP.  THE PH OF THE  ENTERING CAUSTIC IS 10.5 TO 11.  THE PH IN THE RECIRCULATION TANK IS 5.5 TO



6.0.  PH PROBES  ARE LOCATED IN THE FIBERGLASS LINE BETWEEN THE SEPARATOR AND RECIRCULATION TANK.




    GASES  ARE EXHAUSTED THROUGH A FLAKEGLASS LINED STACK APPROXIMATELY 12 FEET IN DIAMETER AND 200*




 FEET IN HEIGHT.  THE OUTLET  TEMPERATURE IS 125 F.  THERE IS NO REHEAT.




    THE  PREDOMINANT DIFFICULTIES WITH THE FGD SYSTEM HAVE BEEN TWO-FOLD.  FIRST* THE PLANT HAS BEEN




UNABLE TO  DEVELOP  AN  ADEQUATE PH CONTROL MECHANISM.  THE PH CONTROL SYSTEM MONITORS THE AMOUNT OF



CAUSTIC  AGENT, I.E.,  SODIUM HYDROXIDE, WHICH GOES INTO THE RECYCLE TANK, KEEPING THE PH OF THE




SCRUBBER SOLUTION  AT  A NONCORROSIVE LEVEL.  THE PLANT HAS BEEN PLAGUED KITH PROBLEMS IN



OPERATING  THE PH CONTROL  SYSTEM AND HAS SUFFERED A CHEAT DEAL OF CORROSION.  THE SECOND PROBLEM



CONCERNS THE CHEMICAL REGENERATION PORTION OF THE SYSTEM.  THE INTENT OF THE PLANT WAS TO SEPARATE




THE FLY  ASH  FROM THE  SCRUBBER LIQUID AND TAKE THE SCRUBBER LIQUID THROUGH A SERIES OF EVAPORATORS




WHERE SODIUM SULFATE, I.E., SALTCAKE, WOULD BE GENERATED.  THE PLANT HAS BEEN UNABLE TO OPERATE THE



FLY ASH SEPARATION SYSTEM PROPERLY, AND THERE IS NOT ENOUGH EVAPORATION CAPACITY FOR THE PLANT TO




PROCESS THE  SCRUBBER  EFFLUENT AT FULL OPERATIONAL CAPACITY.



    IN SPITE OF  THE OPERATIONAL PROBLEMS, THE SULFUR DIOXIDE AND PARTICULATE REMOVAL EFFICIENCIES




OF THE F6D SYSTEM  ARE 90 AND 99 PERCENT, RESPECTIVELY, ACCORDING TO THE PLANT ENGINEER.  THE WASTE



PRODUCT FROM THE SCRUBBER IS NOT RECYCLED, AT PRESENT, AND IS PUMPED TO THE WASTEWATER TREATMENT




PLANT.



    UPON STARTUP,  PROBLEMS OCCURRED "ITH THE PIPING AND VALVES WHICH WERE CONSTRUCTED OF CARBON




STEEL.  THE  CARBON STEEL SYSTEM WAS REMOVED AND REPLACED WITH STAINLESS STEEL VALVES AND PIPING.




SOME PIPING  LEAKS  OCCURRED AND MERE REttELOED.  SUME CORROSION OF OUCT DAMPERS OCCURRED AND MERE RE-




LIEVED BY  ADJUSTING THE PH OF THE SCRUBBING LIUUOR.



    REFER  TO FIGURE 14-27 IN SECTION  14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.








                                         OPERATING HISTORY




3RD QUARTER-1977    NO MAJOR PROBLEMS WERE REPORTED.  CORROSION PROBLEMS STILL EXIST AND PH CONTROL




IS STILL A PROBLEM.  FLOW METERS ARE  BEING INSTALLED TO MONITOR SCRUBBER WATER.








«TH QUARTER-1977    TWO IN LINE FLOW  METERS WERE  INSTALLED ON EACH SCRUBBER, ONE AT THE THROAT INLET



OF THE VENTURI  AND ONE AT THE THROAT.   THE PLANT  REPORTED THAT PH CONTROL WAS STILL A PROBLEM.




SOME PROBLEMS  MERE BEING ENCOUNTERED  WITH THE PH  PROBES DUE TO THE CONSTANT FLOW OF LARGE




AMOUNTS OF SOLIDS, AND SOLIDS DEPOSITS  ON THE PROBES.
                                                105

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS
NEKOOSA PAPERS* INC.; ASHOOWN* ARKANSAS (CONTINUED)


2ND QUARTER-1978    NO MAJOR PROBLEMS OCCURRED DURING THE REPORT PERIOD.  IN JUNE A PARTICULATE
COMPLIANCE TEST MAS RUN.  PARTICULATE EMISSIONS MERE 0.05 LB/MM BTU AGAINST THE O.t LB/MM BTU
REGULATION.  CAUSTIC SCRUBBING SOLUTION IS CYCLED TO THE SCRUBBER FROM THE PULP BLEACH PLANT
AT 400 GPM.  THE BOILER OPERATED 2153 HOURS AT 40* TO 60S CAPACITY.  DURING THAT PERIOD THE SCRUBBER
DEMONSTRATED 100* OPERABILITY.

3RD OUARTER-197B    DURING THIS REPORT PERIOD THE ONLY PROBLEM THAT MAS REPORTED NA8 A RECYCLE
PUMP FAILURE CAUSING UNE SCRUBBER TO BE DOWN FOR APPROXIMATELY l.S DAYS.  HOWEVER* DUE TO THE
PARALLEL ARRANGEMENT OF THE SCRUBBING TRAINS AND LON OPERATING LEVEL OF THE BOILER (40 • 60S), THE
TOTAL FLUE GAS FLOH WAS ROUTED THROUGH THE REMAINING SCRUBBER TRAIN.  THE BOILER HAS REPORTED
TO OPERATE 24 HOURS PER DAY DURING THIS PERIOD.

«TH QUARTER-197B    DUE TO THE PARALLEL ARRANGEMENT OF THE SCRUBBER MODULES AND LOM BOILER LOADS.
SCRUBBER-RELATED BOILER DOWNTIME IS RARE.  THE ENTIRE VOLUME OF FLUE GAS CAN BE ROUTED TO ONE OF THE
SCRUBBERS WHEN THE OTHER NEEDS MAINTENANCE WORK.  HOWEVER* THE PLANT IS CURRENTLY UNDERGOING EXPAN-
SION WHICH WILL REQUIRE BOILER LOADS OF BOS TO 90S.  THIS WILL MEAN THAT THE ENTIRE VOLUME OF GAS
WILL NOT BE ABLE TO BE ROUTED THROUGH ONE MODULE AND PLANT PERSONNEL REPORTED THAT THEY EXPECT MORE
BOILER DOWNTIME DUE TO F6D PROBLEMS OR AT LEAST REDUCED OPERATING LOADS.
    DURING THIS QUARTER* THE LINING OF ONE OF THE SEPARATORS WAS PATCHED.  THE LINING HAD BEEN
CHIPPING OFF CAUSING THE MILD STEEL SHELL TO CORRODE.  CORROSION LEAKS IN THE SEPARATOR WERE ALSO
REPAIRED.  THE BOILER HAS NUT SHUT OOWN.  PLANS HAVE BEEN MADE TO RELINE THE SEPARATORS WITH AN AS
YET UNDETERMINED LINING MATERIAL IN THE SPRING.
    PURCHASED CAUSTIC (I70U-J6UW/UAY) WAS USED 3 TO 4 WEEKS THIS QUARTER SINCE THE PUMP THAT
DELIVERS THE UN-SITE CAUSTIC FROM THE PULP BLEACHING OPERATION BROKE OOMN DUE TO A MECHANICAL
FAILURE.  NO SCRUBBER DOWNTIME RESULTED.
    PH PROBES ARE CLEANED TWICE WEEKLY.  AN AVAILABILITY OF iOOS WAS DEMONSTRATED BY THE FGD SYSTEM.

1ST OUARTER-19T9    THERE WERE NU MAJOK FGO SYSTEM RELATED PROBLEMS REPORTED DURING THE PERIOD.
THE SYSTEM WAS DOWN FOH ABOUT ONE WEEK DUE TO EXPANSION WORK ANO PROBLEMS WITH THE PULVERIZERS
AND BUCKET ELEVATORS.  DURING THIS TIME A SWITCH WAS MADE FROM COAL TO OIL AND GAS.  THERE WERE
PROBLEMS WITH FROZEN COAL AT WHICH TIME SCREENED COAL WAS BOUGHT AND BURNED.  THIS HAD NO EFFECT
ON FOD OPERATIONS.  THE PLANT HAS BEGUN TO BURN SOME BARK.  THfc PLANT EXPANSION IS EXPECTED TO BE
COMPLETED IN DECEMBER 1979.  THERE ARE CURRENTLY NO PLANS TO EXPAND FGO SYSTEM CAPACITY AS IT IS
PRESENTLY RUNNING AT 50 TO 60S OF FULL CAPACITY.
    THE SYSTEM IS STILL EXPERIENCING DIFFICULTY WITH PH PROBE PLUGGING.  IT REQUIRES CLEANING WITH
                                               106

-------
                                                                             STATUS TO APRIL  I97S




                                      SECTION  9  (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS  ON  INDUSTRIAL BOILERS




NEKUOS* PAPERS,  INC.!  ASHDOWN, ARKANSAS (CONTINUED)






HIGH PRESSURE AIR AND  HATER ONCE PER SHIFT.



    NEXT QUARTER THERE MILL BE A MAJOR SCRU8SEK OVERHAUL,  AT  WHICH  TIME  THE  FLAKED GLASS LINING



MILL BE REPLACED BY 317L SS.  THE BRICK LINING IN THE  THROAT  IS EXPECTED TO  BE REPLACED BY  A




NEH ONE.



    THE FGO SYSTEM DEMONSTRATED  lOOt AVAILABILITY THIS QUARTER.
                                                 107

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION NAME



  INSTALLATION LOCATION



  SOURCE CHARACTERISTICS



  SOURCE RATING







  NUMBER OP SEPARATE FGO UNITS



  NUMBER OP BOILERS BEING CONTROLLED



  CONTROL SYSTEM VENDOR



  CONTROL PROCESS



  NEM / RETROFIT



  START-UP DATE



  CONTROL SYSTEM STATUS



  802 REMOVAL EFFICIENCY



  SLUDGE OR BY-PRODUCT DISPOSAL



  CONTROL SYSTEM COST
NORTHERN OHIO SUGAR COMPANY




FREEMUNT, OHIO



COAL (IX SULFUR)




10,000 SCFM (TOTAL - i BOILERS)




140*000 Lb/HR STEAM (TOTAL - 2 BOILERS)



 2




 2



GREAT WESTERN SUGAR




SODIUM HYDROXIDE SCRUBBING



RETROFIT




OCTOBER, 1975




OPERATIONAL








MASTENATER TREATMENT AND DISCHARGE TO CITY SEWER



SEE SECTION 13 FUR DETAILED ECONOMIC INFORMATION
                                        BACKGROUNU INFORMATION



    THE FGD SYSTEM CURRENTLY OPERATING AT THE FREEMONT, UHIO PLANT OF GREAT ME3TERN SUGAR



HAS BEEN DESIGNED FOR BOTH 802 AND PARTICULATE CONTROL.  THE SYSTEM CONSISTS OF A VARIABLE THROAT



VENTURI SCRUBBER MITH A SINGLE PASS, THREE STAGE CHEVKON MIST ELIMINATOR.



    A BLEED-OFF STREAM OF SCRUBBER EFFLUENT IS CONTINUOUSLY DISCHARGED TO A HOLDING POND FON



TREATMENT.



    REFER TO FIbURE l«-29 IN StCUuN 14 FOR A UETAILEI) PNOCESS FLO* UlAGRAM OF THIS SYSTEM.
                                               108

-------
                                                                             STATUS 10 APRIL  1979
                                      SECTION  9 (CONTINUED)
            PERFORMANCE DESCRIPTION FOK UPEKAllUNAL FGD SYSTEMS ON INOUSTKIAL BUlLtKS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOUfcCE CHARACTEHIST1CS
  SOURCE BATING
  NUMBER OF SEPARATE FGD  UNITS
  NUMBER OF BOILEK8 BEING CONTROLLED
  SOURCE CAPACIU


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEH / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  302 REMOVAL EFFICIENCY
  PAKTICULATE REMOVAL  EFFICIENCY
  HATER MAKE-UP
  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
PFI2EH, INC.
EAS1 ST. LOUIS, ILLINOIS
COAL 13.bX SULFUR)
10,000 SCFM UUTAL 3 OOILERSJ
 i
 i.
20 M*  lEUUIVALEwT)
IFOR iHiSi REPOKT, UNLESS SlATfcD OTHERWISE, 2000 SCFM ~ 1 EQUIVALENT MW.
THIS IS BECAUSE GAS FLU* RATE IS THE PRIMARY FACTOR I» MODULE SIZING.)
JN-hUUSE DESIGN
LIME SCRUBBING
RETKUFIT
SEPTEMBER, 19TO
OPERATIONAL
99X tiOOO PPM SU2 ol INLET)
Va\ C1«S LH/HR ASH «i INLET)
SO GPM
DEMA1EREO SLURRY TO LANDFILL
SEE SECTION 13 FOK DETAILED ECONOMIC INFORMATION
                                        BACKGROUND INFORMATION
    AT  THE  IRON  OXIDE  PIGMENT PLANT OF PFIZERt INC. IN EAST ST. LOUIS, ILL. THREE BOILERS ARE USED
TO PROVIDE  PROCESS  STEAM.   THE THREE BOILERS HAVE STEAM OUTPUTS Of 10,000, 30,000 AND 100.000 LB/HR
NlTH CORRESPONDING  HEAT  INPUTS OF 20 MM bTU/HR, SOMM BTU/HX, AND ISO MM BTU/HH.  THE TftO SMALLER
80ILER3 HAVE TRAVELLING  GRATE STOKERS WHILE THE LARGE BOILER HAS A SPREADER STOKER.  THE FUEL USEO
     [
IN THESE BOILERS IS ILLINOIS BITUMINOUS COAL WITH ABOUT 3.5* SULFUR, 8-12X ASH, AND A HEATING VALUE
OF 11,WOO BTU/Lti.   THE COAL IS WASHED AND SIZED TO 1 1/4 IN X 0 IN.  THE UNCONTROLLED S02 EMISSIONS
FOR THE THREE  BOILERS  ARE  128, 320, AND 9bO LB/HR (TOTAL OF 140B LB/HR)* WHILE THE PARTICULATE
EMISSIONS ARE  14, 16,  AND  115 LB/HR (TOTAL OF 145 LB/HR}.  THE CORRESPONDING ALLOWABLE EMISSIONS
ARE 3br 90, AND  270 LB/HR  (TOTAL OF 396 LB/HR) FOR 302, AND 12, 15.5, AND 21 LB/HH (TOTAL OF
/
49 LB/HR) FOR  PARTICIPATES.
    IN  LATE 1-J74, PFIZER SELECTED THE NLA-L£WIS ABSOKBER FOR A LIME FGO SYSTEM (SEE OPERATING
HISTORY FOR DETAILS ON DESIGN MODIFICATIONS PERFORMED BY PFIZEH, INC.).  THE NLA-LEWIS SCRUBBER
IS A HORIZONTAL, ROTATING  CYLINDER MOUNTED ON TRUNNIONS ANO SLOPED UPWARD ABOUT 1/2 DEGREE TO
PROVIDE GRAVITY  FLOW OF  THE LIME SLURKY COUNTERCURHENT TO THE GAS FLOW.  THE SHELL CONTAINS
RINGS OF FILTER  BOXES  INTERLACED WITH LOOSELY HUNG CHAINS.  THE LIME SLURRY CASCADES OVER THE
CHAINS  THUS PROVIDING  AN IMMENSE DHUHLET AREA Irt ADDITION TO THE WETTED CHAIN SURFACE FOR CONTACT
KITH THE FLUE  GAS.   1HE  CHAINS ALSO SCOUR THE 1NTEHNAL SURFACE TO PREVENT SCALING.
                                               109

-------
                                                                             STATUS TU APRIL  1979
                                      SECTION  9  (CONTINUED;
             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON  INDUSTRIAL BOILERS
PFIZER, INC.; EAST ST. LOUIS, ILLINOIS  (CONTINUED)

    THE FLUE GAS FROM ALL THE THREE BOILERS  (74,000 ACFM ol 2SO F) ARE MANIFOLDED INTO THE SCRUBBER
(11 FT OIA X d7 FT LONG) WHICH CONSISTS OF DRYING   (7 FT), SCRUBBING  (35 FT), HIST ELIMINATING,
(7 FT), AND DROPOUT Clb FT) ZONES.  FRESH QUICKLIME (9JX CAO, 3/8 IN  X 0 IN) IS ADDED ALONG HITH
MAKEUP MATER TO THE SLAKEH.  THE FEED PUMP SUPPLIES ABOUT 50 GPM OF LIME SLURRY (10 NT.Z), HHILE
THE DISCHARGE FLO* RATE IS ABOUT 25 GPM OF CAS03/S04 SLURRY  (30 WT.X).  EACH BOILER HAS AN
1.0. FAN, AND THE SCRUBBER HAS ONE I.D. FAN.  THERE IS A CYCLONIC MIST ELIMINATOR CONTAINING
IMPINGEMENT TUBES DOWNSTREAM OF THE SCRUBBER 1.0. FAN.  THE PRESSURE DROP ACROSS THE SCRUBBER IS
£ 1/2 INCHES OF WATER.  THE SCRUBBER DISCHARGE PH IS CONTROLLED AT 6.0 OR ABOVE.  THE INTERNAL
SLURRY POOL CONTAINS BETWEEN 3000 10 4000 GALLONS OF SLURRY.  AT 2 2/3 RPM, THE LIFTER BOXES
GIVE AN EFFECTIVE INTERNAL L/G RATIO OF 66 GAL/1000 ACF.  TYPICAL 302 AND PARTICIPATE REMOVAL
EFFICIENCIES ARE 9bX (1408 LB/HR a INLET) AND 75X (145 LB/HR 9 INLET).  THE WASTE SLURRY IS MIXED
NITH SOME FRESH LIME, UTILIZED IN NEUTRALIZING 01HER MASTENATER STREAMS FROM THE PLANT AND
FILTERED.  THE FILTRATE IS DISPOSED OF, AND THE SLUDGE IS LANDFILLEO.
    THE BOILER I.D. FANS, INLET DUCTWORK, THE SCRUBBER INTERNALS AND  SHELL, AND THE SLAKER ARE
MADE OF CARBON STEEL.  THE SCRUBBER I.D. FAN, OUTLET DUCTWORK AND THE STACK ARE 316 33.  THE
IMPINGEMENT TUBES IN THE MIST ELIMINATOR ARE PVC  CPOLYVINYL CHLORIDE); AND THE SLURRY FEED PUMP
IS RUBBER-LINED.

                                         OPERATING HISTORY
J975-197B    THE NLA-Lfc«IS SCRUBBER "AS SELECTED  IN LATE 1974 BASED ON ITS RELATIVELY LOW ENERGY
REQUIREMENTS, SIMPLICITY, AND FREEDOM FKOM PLUGGING.  PFIZER LOCATED AN IDLE DOLOMITE KILN (11 FT
OIA X 67 FT LONG) AMD FILLED IT NITH THE NLA-LEWIS CHAIN SYSTEM.  IN ADDITION, PFIZER
INCORPORATED A DRYING SECTION BEFORE THE MET SCRUBBER TO OEWATErt THE WASTE SLUDGE PRODUCT BY
CONTACT NITH THE INCOMING FLUt GAS.  THIS CONCEPT OFFERS A PRODUCT SUITABLE FOR LANDFILL.  THE
SCRUBBER NAS INSTALLED TO HANDLE THE FLUE GAS FROM THE LARGE BOILER  (ISO MILLION BTU/HR) SUPPLIED
BY ERIE CITY.
    THE SCRUBBING SECTION CONTAINED ABOUT FIVE TONS OF CHAIN.  THE DRYING SECTION CONTAINED A80UT
FIVE TONS OF CHAIN AND A NEUTRALIZING PORTION FREE OF CHAINS.  ALL THE SCRUBBING EBUIPMENT NAS OF
MILD STEEL, EXCEPT FOR A FEW 1EST CHAINS.  TESTS ON THIS CONFIGURATION INDICATED EXCELLENT 802
REMOVAL* bUT INADEQUATE PARTICULATE CAPTURE.  THE PARTICIPATE EMISSIONS (42 LB/HR)  HERE STILL
TWICE THE ALLOWABLE LIMIT OF 21 LB/HR.
    IN OROEH TO IMPROVE THE PAMTICULATE REMOVAL,  THE SCRUBBING SECTION NAS SHIFTED TO THE CENTER
OF THE KILN IN EARLY 1977 AND HEAVIER LOW ALLOY (AISI «8620) CHAINS MERE INSTALLED*  A MIST
ELIMINATOR SECTION OF IMPINGEMENT ZONE AND A DROPOUT ZONE WERE ADDED DOWNSTREAM OF  THE SCRUBBING
SECTION.  THE DRYING CHAINS WERE REMOVED AND THE SCRUBBER WAS OPERATED NITH A NET DISCHARGE.  NITH
THESE DESIGN CHANGES, PARTICULATE EMISSIONS WERE REDUCED TO 26 LB/HR, 5 LB/HR SHORT OF THE EPA
                                               110

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION  9 (CONTINUED)
             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS
PFIZER.  INC.)  EAST  ST.  LOUIS,  ILLINOIS (CONTINUED)

REOUIREMtNT.   302  REMOVAL WAS  INCREASED TO 97X.  THE PH OF  THE SPENT SLURRY HAS RELATIVELY
STABLE  AT  6.0.  AT  THIS SET POINT, THE LIME CONSUMPTION WAS 1000 L8/HR FOR 302 REMOVAL OF
990 LB/HR  (960 LB/HR at  INLET).
    IN  1976f  IT WAS DECIDED TO ROUTE THE FLUE GASES FROM THE TnO SMALL BOILERS TO THE SCRUBBER.
IT HAS  EXPECTED THAT THE ADDED GAS FLOW AND THE CORRESPONDING INCREASE IN PRESSURE DROP MOULD
ENHENCE  PARTICULATE REMOVAL.  AN ENLARGED SCRUBBER l.D. FAN, OUTLET DUCT, AND STACK OF 316 S8 WERE
ADDED!  AS  WELL AS  THE MIST ELIMINATOR BEFORE THE STACK.  THE DRYING SECTION OF THE SCRUBBER WAS
REACTIVATED  WITH 30 TONS OF LOW ALLOY CHAINS.  IN THE FINAL CONFIGURATION, WHICH IS DESCRIBED IN  _
THE BACKGROUND SECTION, THE OPERATIONS WERE RELATIVELY SIMPLE AND UNSOPHISTICATED RESULTING IN
VERY HIGH  (>96X) AVAILABILITY  VALUES.

4TH OUARTfcR-197«    EMISSION TES1S HERE CONDUCTED DURING THIS QUARTER, AND FINAL EPA APPROVAL WAS
GRANTED  FOR  COMPLIANCE  OF BOTH 302 AND PARTICULATE EMISSION STANDARDS.
    WITH DRY  DISCHARGE, THE LIME FEED IS PROPORTIONED TO COAL FEED, AND BIASED MANUALLY
TO COMPENSATE FOH  OTHER CHANGES.  WITH LIQUID DISCHARGE, THE CURRENT MODE OF OPERATION, THE LIME
FEED HATE  IS  ADJUSTED MANUALLY TO KEEP THE DISCHARGE PH AT  6.0.
    THE SYSTEM RELIABILITY WAS 96X.

1ST OUARTER-1979    THE PVC IMPINGEMENT TUBES IN THE MIST ELIMINATOR HAVE SHOWN CREEP FATIGUE.
TO REDUCE  THE LOAD UN THESE TUBES, ADDITIONAL CHAINS ARE INSTALLED  IN  THE MIST ELIMINATOR SECTION
INSIDE  THE SCRUBBER.  THE LOW ALLOY CHAINS IN THE SCRUBBING SECTION HAVE EXPERIENCED SOME
CORROSION.  THE PH CONTROL WILL BE IMPROVED (MINIMUM DISCHARGE PH OF 6.0) TO AVOID FURTHER
CORROSION.  A VARIABLE. SPEED KILN URIVE WILL Bt ADDED TU THE SCRUBBER  TO PERMIT BETTER CONTROL OF
THE DRIED  PRODUCT  MOISTURE.
    A RELIABILITY  OF 951 WAS REPORTED.  THE DOWNTIME WAS REUUINED MAINLY FOR THE INSPECTION OF THE
MIST tLIMINATUH AND SCRUBBER INTERNALS.
                                                Ill

-------
                                                                              STATUS TU APRIL  1979
                                      SECTION  9  (CONTINUED)
             PERFORMANCE DESCRIPTION  FOK OPERATIONAL FGU  SYSTEMS  ON  INDUSTRIAL BOILERS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SUUKCt CHARACTERISTICS
  SOURCE KAllub
  NUMBER OF SEPARATE FGD UMTS
  NUMBER OF HUILERS BEING  CONTROLLED
  SOURCE CAPACIIY


  CONTROL  SYSTEM VENDUR
  CONTROL  PRUCEbS
  NEW / RETROFIT
  START-UP DATE
  CONTROL  SYSTEM STATUS
  S02 REMOVAL  EFFICIENCY
  SLUDGE UK dY-PRUDUCT DISPOSAL
  CONTROL  SYSTEM COST
REICHHOLD CHEMICALS, INC.
PENSACULA, FLUR1UA
wuuo a OIL (2X SULFUK)
80,000 SCFM (TOTAL • i BOILERS)
170,000 ACFM a 530 F (TOTAL - 2 BOILERS)
200,000 LB/HR STEAM (TOTAL)
40 hn (EQOIVALENT); TUTAL - & BOILERS.
(FOK THIS REPORT, UNLESS STATED OTHERWISE,  2000 SCFM * 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
NEPTUNE AIRPOL, INC.
SODIUM CARdONATE SCRUBBING
RETROFIT
JUNE, 1975
OPERATIONAL
NOT AVAILABLE
NASTEMATEtt TREATMENT AND DISCHARGE TO TAILINGS POND
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION
    REICHHULO CHEMICALS,  INC.  LOCATED IN  PENSACOLA,  FLORIDA OPERATES A T«0-bOILER STEAK PLANT
WHICH GENERATES  A  TOTAL  OF  QO,OuO  SCFM AT  MAXIMUM LOAD.   THE  OIL  ANO "000 FIRED BOILERS INSTALLED
IN 1973, ARE RATED FOR  100,QUO LB/HH  STEAM EACH WITH TOTAL HEAT INPUT 300 MILLION BTU/HK.
    EMISSIONS ARE  CONTROLLED BY AN AIRPOL  AIR  QUALITY  CONTROL SYSTEM CONSISTING OF A VENTURI
SCRUBBER ANO SEPARATOR  IN WHICH PARTICIPATE ANO S02  REMOVAL OCCUR SIMULTANEOUSLY.  SULFUR DIOXIDE
REMOVAL TAKES PLACE BY  THE  USt OF  SUDIUM  CARBONATE FGO TECHNOLOGY.  EACH SCHOBBER HANDLES 65,000
ACFM OF FLUE GAS AT 530  F.  THE TOTAL INSTALLED COST OF  BOTH  THE  SCRUBBERS WITH STUB STACKS  (ATOP
THE SCRUBBER) WAS  i«J7U,000  IN  1973.   THE  VENTUHI  SCRUBBERS  (b FT  OIA X 16 FT HIGH) AND SEPARATORS
(11.75 FT OIA X ?b  FT HIGH) ARE CONSTRUCTED OF 304 SS  ANO CARBON  STEEL RESPECTIVELY.  THE STUB
STACKS (6.5 FT UIA  X 31  F1  HIGH) AND  FANS  (UPSTREAM  UF THE SCRUBBERS) ARE CARBON STEEL.
    PRESSURE DROP  ACRUSS  THE VENTORI  VARIES 17-24 IN H.G.

                                         OPERATING HISTORY
    NO INFORMATION  HAS BEEN MADE AVAILABLE  BY  THE PLANT  PERSONNELON OPERATING EXPERIENCE.
                                               112

-------
                                                                             STATUS TU APRIL  1979

                                      SECTION  9 (CONTINUED)
             PERFORMANCE  DESCRIPTION FOR OPEKA11UNAL FGD SYSTEMS ON INDUSTRIAL &OUERS
  INSTALLATION  NAME
  INSTALLATION  LUCAUUN
  SOURCE  CHARACTERISTICS
  SOURCE  HATING

  NUMBER  UF SEPARATE  I-GD  UNITS
  NUMBER  UF BUILEKS BEING CONTROLLED
  SOURCE  CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW  / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  302  REMOVAL EFFICIENCY

  PARTICIPATE REMOVAL EFFICIENCY
  HATER MAKE-UP
  SLUO&E  OR BY-PRODUCT DISPOSAL

  CONTROL SYSTEM COST
RICKENBACKER AIR FORCE BASE
COLUMBUS, OHIO
COAL li.bX SULFUK)
55,000 SCFM (TUTAL - 7 BOILERS)
277,OUU LB/HR STEAM
 1
 7
27 MW (EQUIVALENT); TOTAL - 7 BOILERS
(FOR THIS KEPURT, UNLESS STATED OTHERWISE. £000 SCFM = 1 EQUIVALENT MW.
THIS IS BECAUSE UAS f-LUM HATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
RESEARCH-COTTRELL/BAHCO
LIMESTONE SCRUBBING
RETROFII
MARCH, 1976
OPERATIONAL
901+ (DESIGN)
ACTUAL REMOVAL is MUM LONER DUE TO EASING OF REGULATIONS.
98X
OPEN LOOP - 2.b GPM/MW (MAX)
NON-FIXATED SLUKKY TO LINED POND
UNSTAttlLIZED CAS03/S04 SLUDGE TO LINED POND
SEE SECTION 13 FUR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
    UN  MARCH  11,  1976  THE FIRST  U.S. INSTALLATION OF THE SftEDISH BANCO SULFUR DIOXIDE REMOVAL SYSTEM
DAS PLACED  IN SERVICE  AT  RICKENBACKER AIR FORCE BASE IN COLUMBUS, OHIO.  THE SYSTEM. MANUFACTURED
BY A.6.  BAHCO VENTILATION OF  ENKOP1NG,  SWEDEN,  DISTRIBUTED EXCLUSIVELY IN THE UNITED STATES BY
RESEARCH/COTTRELLt  HAS ORIGINALLY  INSTALLED Al  RICKENBACKEH TO HANDLE THE FLUE GAS FROM SEVEN
Jl MM BTU/HR  STOKER-TYPE  COAL FIRED BOILERS INSTALLED BETnEEN 1954 AND 1956.  IN JUNE 1977, A NEW
»0 MM BTU/HR  BOILER CAME  INTO SERVICE.   THIS UNIT REPLACED i. OF THE OLDER BOILERS, AND A THIRD MAS
PLACED  ON STAND-BY.  THE  BOILERS ALL FIRE A HIGH SULFUR 13.61) COAL.
    THE RICKENBACKER EMISSION CONTROL SYSTEM CONSISTS ESSENTIALLY OF A MECHANICAL COLLECTOR, 2-STAGE
BACHO SCRUBBER TOWER,  LIMESTONE  STORAGE AND HANDLING SYSTEM, CLARIFIER, BOOSTER FAN AMD ASSOCIATED
OUCT-HORK,  PUMPS, CONTROLS,  AND  A  SLUDGE DISPOSAL POND.
    SOLID PARTICULATE  ANO SULFUK DIOXIDE-LADEN  FLUE GAS TAKEN f-KUM EACH OF THE EXISTING SIX
STACKS  IS FED THROUGH  A COMMON HEADER AND INTO  A MECHANICAL COLLECTOR WHERE PRIMARY PARTICULATE
REMOVAL TAKES PLACE.  THE MECHANICAL COLLECTOR  HAS A DESIGN REMOVAL EFFICIENCY OF 70 PERCENT AND
MAS INSTALLED PRIMARILY TO REDUCE  FAN WEAK.  THE PARTIALLY CLEANED GAS THEN FLUhS INTO THE BACHO
                                               113

-------
                                                                             STATUS TO APRIL  1979



                                       SECTION   9  (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL  FSD  SYSTEMS  ON  INDUSTRIAL BOILERS



RICKENBACKER AIR FORCE  BASE I COLUMBUS* OHIO  (CONTINUED)





TOMER WHERE ADDITIONAL  PARTICULATE  AND PRIMARY  SULFUR DIOXIDE REMOVAL  TAKES PLACE.



     THE BACHO  SCRUBBING VESSEL  IS A VERTICAL TOWER  CONSISTING OF  TWO SCRUBBING STAGES.  CAS FLOWS



THROUGH THE TONER  WHERE IT IS CONTACTED  WITH A  LIMESTONE  SLURRY.   AFTER PASSING THROUGH THE



FIRST SCRUBBING  STAGE,  ENTRAINED MOISTURE  IS REMOVED  BY A CYCLONIC TYPE MIST ELIMINATOR.  THE



GAS  THEN  PASSES  THROUGH A  SECOND SCRUBBING STAGE  AND  A SECOND CYCLONIC MIST ELIMINATOR.  THE



CLEANED GAS IS DISCHARGED  TO  THE ATMOSPHERE  THROUGH A STUB STACK  ATOP  THE ABSORBER TOMER.



     FINE  MESH  LIMESTONE IS EMPLOYED A3 THE REAGENT  IN THE SCRUBBING  SYSTEM.  THE SCRUBBING SLURRY IS



  PUMPED TO THE ABSORBER WHERE IT IS CONTACTED WITH  THE FLUE GAS IN A COUNTERCURRENT FASHION,



     THE SPENT  SCRUBBING SOLUTION IS DISCHARGED  TO THE THICKENER WHERE  THE WASTE SOLIDS SETTLE OUT.



THICKENER OVERFLOW IS RETURNED  TO THE  MIX/HOLD  TANK.   THICKENER UNDERFLOW IS DISCHARGED TO A 5-



ACRE HYPALON-LINED DISPOSAL POND.   THIS  POND IS LOCATED APPROXIMATELY  400 FEET FROM THE ABSORBER



TOWER.  CLEAR  WATER FROM THE  POND  IS RETURNED TO  THE  PROCESS AS MAKE-UP WATER IN THE SLURRY TANK.



     REFER TO FIGURE 14-31  IN  SECTION 14  FOR  A DETAILED PROCESS FLOW  DIAGRAM OF THIS SYSTEM.







                                         OPERATING  HISTORY



MAR. 76 THROUGH  OCT.  76    THE  INITIAL OPERATION  PROCEEDED IN AN  OPEN-WATER-LOOP MODE BECAUSE THE



THICKENER WAS  NOT  VET COMPLEIELY INSTALLED.  SULFUR DIOXIDE INLET  CONCENTRATIONS WERE IN THE 1600 TO



2000 PPM  RANGE.  HIGH OXYGEN  CONCENTRATIONS  ALSO  EXISTED  IN THE FLUE GAS BECAUSE THESE OLDER* IN-



EFFICIENT BOILERS  OPERATE  AT  150 TO 160  PERCENT EXCESS AIR RATES.  8ULFER DIOXIDE REMOVAL EFFICIENCY



HAS  IN THE LOW 90  PERCENT  PLUS  MANGE.  EARLY PROBLEMS WERE PRIMARILY OF A MECHANICAL NATURE USUALLY



ASSOCIATED WITH  START-UP.   THE  MAJOH START-UP PROBLEMS WERE AS FOLLOWS!



UP PROBLEMS HEHE AS FOLLONSI



          1. ELECTRICAL  CIRCUITS AND SYSTEM CONTROL  PANEL.



          Z. PUMP MALFUNCTION-SPARE  PARTS SHIPMENT DELAY.



          3. SEDIMENTATION  BUILDUP IN THE SCRUBBER VESSEL  (THIS WAS DUE PRIMARILY TO OPERATION AT



            HIGHER THAN DESIGN  SULIDS  CONCENTRATION IN THE SCRUBBING SOLUTION BECAUSE THE THICKENER



            HAS NOT YET IN SERVICE  PLUS GRIT GETTING  THROUGH THE  LIME  SLAKER GRIT REMOVAL STEP).



          4. FAMILIARIZATION OF  THE  OPERATING STAFF  WITH THE MECHANICS  OF THE PROCESS.



          b. I.D. BOOSTER FAN PROBLEMS.  ADDITIONAL  BRACING* AND EPOXY  GROUTING WAS REQUIRED TO STOP



            THE ELEVATED FAN CONCRETE  SUPPORT FROM  VIBRATING WHILE THE FAN WAS OPERATING.







NOV. 76 THROUGH JUN.  77    DOWNTIME  WAS LESS THAN 51.  OPERATING  PROBLEMS WERE MECHANICAL- AND



CONTROL- RATHER THAN  PROCESS-RELATED.  FAN-RELATED  PROBLEMS ACCOUNTED  FOR OVER 75* OF THE ACTUAL



DOWN-TIME.  THIS RESULTED  FROM  EXCESSIVE FAN VIBRATIONS CAUSED BY  BEARING, SUPPORT, AND INSTRUMENT-



ATION DIFFICULTIES.   IN APRIL 1977,  THE FAN  WHEEL DEVELOPED A CRACK  IN THE RIM ATTRIBUTED TO



FATIGUE FROM RESONANT VIBRATION.  THE FAN  MAS SENT  BACK TO THE MANUFACTURER, AMERICAN STANDARD, MHO
                                               114

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGU SYSTEMS ON INDUSTRIAL BOILERS



RICKENBACKER Alk FORCE BASE; COLUMBUS* OHIO (CONTINUED)






MADE THE KtUUIRtD MODIFICATIONS.  THE ORIGINAL FAN WAS RADIAL BLADE WITH RIMS, AMD A MAJOR MODIFI-




CATION HAS CHOPPING THE RIMS OFF, THtREBY REDUCING THE DIAMETER.  THE FAN HAS RETURNED IN EARLY MAY




AND THE VIBRATION PROBLEM HAS SOLVED.  OTHER OPERATIONS HERE RELATIVELY PROBLEM-FREE.  THERE HERE



NO CORROSION,  EHOSION, SCALING, OR PLUGGING PROBLEMS.  THE SYSTEM BEGAN RUNNING ON LIMESTONE IN




APRIL, AS PART UF THE EPA TEST PROGRAM.  LIMESTONE PERFORMED WtLL, YIELDING ADEQUATE REMOVAL.



ON JUNE 3R0, THb STEAM PLANT WAS SHUTDOWN FOR THE TIE-IN OF THE NEW NO. 8 BOILER.  TIE IN WAS COM-



PLETED IN JUNE.








AUG. 77     THE ARMS BROKE OFF IN THE 25-FOOT DIAMETER THICKENER TANK, CAUSING A 30 DAY DOWNTIME.



SEP. 77     A  MAKE-UP WATER BOOSTER PUMP HAD TO BE REPLACED.




OCT. 77     THb MOTOk DRIVE ON THE SLAKER BELT HAD TO BE REPAIRED.  ALTHOUGH THE SLAKER IS NO LONGER




USED WITH THE  LIMESTONE REAGENT, THE BELT IS USED TO CONVEY THE LIMESTONE TO THE DISSOLVING TANK.








1ST UUARFLH-197B    IT WAS DISCOVERED THAT WITH A 3TOICHIOMETHIC RATIO OF 0.75 THE REQUIRED DEGREE



OF SU2 REMOVAL CAN BE ACHIEVED.  THE CURRENT REGULATION LIMITS EMISSIONS TO 2.2 LBS/MM BTU HEAT




INPUT.  DURING THE JANUARY BLIZZARD, SOME FREEZE-UP PROBLEMS WERE ENCOUNTERED.




DURING JANUARY THE BOILERS OPERATED 744 HOURS AND THE FGD SYSTEM OPERATED 596 HOURS YIELDING OPER-



ABIL1TY AND AVAILABILITY INDEX VALUES OF BOX.  ALL DOWNTIME WAS ATTRIBUTABLE TO FREEZE-UPS DURING




BLIZZARD CONDITIONS.  DURING FEBRUARY, THE BOILERS OPERATED 672 HOURS AND THE CONTROL SYSTEM OPERA-



TED 168 HOUMS.  HOWEVER THE FGO SYSTEM WAS AVAILABLE 551 HOURS.  THEREFORE THE OPERABILITY INDEX MAS




2SX WHILE 1HE  AVAILABILITY WAS 8£X.  THE ABSORBER LINES HERE THAwEO OUT FEBRUARY b, BUT DURING




FEBRUARY, THE  GOVERNOR OF OHIO TEMPORARILY SHELVED POLLUTION CONTROL REGOLATIONS.  THEREFORE THE



FGD SYSTEM WAS NOT OPERATED ALTHOUGH IT WAS AVAILABLE t-OK OPERATION.  THE SYSTEM WAS SHUTDOWN ON




FEBRUARY 13 AND DID NUT OPERATE DURING MARCH.








2ND bUARTER-1976   SYSTEM WAS RESTARTED APRIL 10 AND WAS REPORTED TO HAVE RUN WITH A 100X OPERA-



6ILITY INDEX VALUfc FOR THE REMAINING PERIOD.  PLANT REPORTED THAT ALL PREVIOUS PROBLEMS HAVE




BEEN CORRECIEO.  DURING THE LAST PORTION OF THt 2ND QUARTER THE BOILER LOAD DROPPED TO ITS SUMMER



LEVEL, ABOUT 30 MM oTU/HR, AS OPPOSED (U THE MAXIMUM COLD SEASON LOAD OF 150 MM BTU/HR.








3RD QUAHT6R-1970    THE SYSTEM OPERATED WITH AN AVAILABILITY INDEX OF OVER 99.5X FOR THE




PERIOD.  THE SCHUbBER WAS CLEANED AND INSPECTED DURING A 5-DAY BOILER MAINTENANCE OUTAGE AND




FOUND TO BE RELATIVELY FREE OF CORROSION AND SCALING.  THE SYSTEM WAS OBTAINING ABOUT 75X 302




REMOVAL, WHICH WAS SUFFICIENT TO MEET THE REGULATION.  WHILE THE BOILER IS OPERATING AT ITS REDUCED



SUMMER LOAD, FRESh MAKE-UP AIR IS BEING MIXED WITH THE FLOE GAS ENIERING THE F.D. FAN TO MAINTAIN




FULL GAS PRESSURE AND VELUCITY THROUGH THE ABSORBER.
                                               115

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9  (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS UN INDUSTRIAL BOILERS



RICKENBACKER AIR FORCE BASE; COLUMBUS, OHIO (CONTINUED)










4TH OUARTER-1978    THE FGD SYSTEM EXPERIENCED 3b HOURS UF DOWNTIME DURING THE PERIOD FOR AN OVERALL



AVAILABILITY INDEX OF 96.HI.  MUST OF THE DOWNTIME HAS CAUSED BY A BROKEN HELD ON THE FAN



HOUSING.  THE NUCLEAR DENSITY CONTROL VALVE ON THE CLAKIFIER UNDERFLOW DEVELOPED PROBLEMS AND HAS



REPAIRED bY THE MANUFACTURER.  THE SCRUBBER OPERATOR REPORTED THAT SHUTDOWN/STARTUP IS A SMOOTH



PROCEDURE.  A CLEANOUT/MAINTENANCE SHUTDOWN IS TENTATIVELY SCHEDULED FOR LATE WINTER.







1ST OUARTER-1979    THE FGD SYSTEM DEMONSTRATED AN AVAILABILITY OF ABOUT 9S.6X DURING THE REPORT



PERIOD.  PLUGGING OF THE FIRS1 STAGE LEVEL TANK LINE CAUSED A 4-DAY OUTAGE IN EARLY MARCH.  DUE TO



COMPLIANCE TESTS BEING CONDUCTED* THE SYSTEM HAS  BEEN OPERATING AT A HIGHER LIMESTONE FEED STOICHIO-



METRY AND ACHIEVING 802 REMOVAL EFFICIENCIES AS HIGH AS 80-65 PERCENT.  THE HIGH LIMESTONE FEED RATE



MAT HAVE CAUSED THE PLUGGING PROBLEM.  PLANS ARE  BEING MAOE TU TEST THE SYSTEM WITH PEBBLE LIME.



THE CLEANOUT/MAINTENANCE SHUTDOWN ORIGINALLY SCHEDULED FUR LATE WINTEK HAS BEEN POSTPONED UNTIL JUNE



AND HILL ACCOMPANY AN 6 TO  10 DAYS BOILER INSPECTION.
                                               116

-------
                                                                             STATUS 1U APRIL  1979

                                      SECTION  9 (CONTINUED)

            PtRFORMANCt  DESCRIPTION  FUR  OPERATIONAL  FGl> SYSTEMS UM INDUSTRIAL BOlLtRS
  INSTALLATION NAMt

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE RATING
  NUMBER OF SEPARATE FGO  UNITS

  NUMBER OF BOILERS bEING CONTROLLED

  80URCt CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW / RETROFIT

  START-UP UA1E

  CONTROL SYSTEM STATUS

  S02 REMOVAL EFFICIENCY

  SLUDGE OR 6Y-PHOOUCT DISPOSAL
  CONTROL SYSTEM COS I
TEXACO INCORPORATED

SAN ARUOf CALIFORNIA

OIL It.7* SULFUR)

317,UUO SCFM tFUIAL - 2-J HOILERS)

22,000 ACFM a, bOU f, FOR EACH Oh 22 FGD SYSTEMS

60,000 ACFM « 600 F, FOR EACH OF t F6D SYSTEMS

10,000 ACFM 4 600 f, FOR EACH OF 5 SYSTEMS

29

29

173 MA (EQUIVALENT)) 1S60 MILLION BTU/HRi TOTAL - 29 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM *  1 EQUIVALENT MN.
THIS IS BECAUSE GAS FLO* RATE IS THE PRIMARY FACTOR IN  MODULE SIZ7N6.)

CE1LCOTE

SODIUM HYUKUXIUt SCRUBBING

RETROFIT

NOVEMBER, 1973

OPERATIONAL

73X 11000 PPM i INLET)

WASTEOATER TREATMENT

HALF UF THE SCRUBBER UNDERFLOW IS TREATED AND RECYCLED  AS

BOILER FEEDWATEM; THE OTHER HALF tots TO NASTENATER

DISPOSAL MELLS.

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

    TEXACO USCS SEVERAL  OIL-FIRED  BOILERS AT  THE  SAN AROU,  CALIFORNIA SITE.  THE STEAM IS INJECTED

INTO OIL MELLS  iu FACILITATE  OIL FLOW.   NINE  (so  MILLION BTU/HR EACH) OUT OF A TOTAL 36 STEAM

GENERATORS MILL HAVE OUCON FGO  SYSTEMS.  THE  NINE UNITS WITH OUCON SYSTEMS ARE REPORTED SEPARATELY

REPORT.  THE UTHER 29 GENERATORS ARE  IN THREE DIFFERENT SIZES:  T«0, EACH o 160 MILLION BTU/HRr

25 EACH » bU MILLION BTU/HR,  AND FIVE,  EACH d 20  MILLION UTU/HR.  THE FUEL OIL HAS A TYPICAL SULFUft

CONTENT OF 1.7X.

    THE FLUE GASES (80,000 ACFM FROM  THE LARGE, 22.000  ACFM FROM THE INTERMEDIATE, AND 10,000 ACFM

FROM THE SMALL GENERATORS <* 600 F)  ARE  SCRUBBED BY FGO  SYSTEMS  SUPPLIED BY CEILCOTE COMPANY IN

NOVEMBER 1973.  EACH BOILER IS  FOLLOWED BY  A  UUENCHING  CHAMBER  AND A SCRUBBER.  THE SCRUBBERS, WHICH

ARE HORIZONTAL TOnERS PACKED  «ITH  i IN. TELLER1TE PACKINGS, ARE OF SIZES: IS FT LONG X IS FT HIDE X

20 FT HIGH (2 LARGE UNITS), IS  FT  LONG  X 15 FT MICE X 9.S FT HIGH (22 INTERMEDIATE UNITS), AND THE

GAS FLOWS ACROSS THE HORIZONTAL SCRUBBER WHEREAS  THE LIQUID IS  SPRAYED PRIMARILY IN A CROSS-CURRENT

MODE.  THE ABSORBER SECTION IS  FOLLOWED BY  A  SHORTER PACKED DEPTH WHICH SERVES AS A MIST ELIMINATOR
                                               117

-------
                                                                              STATUS TO  APRIL   1979



                                       SECTION   S  (CONTINUED)



             PERFORMANCE  DESCRIPTION  FOR  OPERATIONAL  FGD  SYSTEMS  ON  INDUSTRIAL BOILERS



TEXACO  INCORPORATED*  SAN  ARDO,  CALIFORNIA (CONTINUED)





(M-E).   THE  SCRUBBING LIQUOR IS A  MIXTURE OF NATURAL  WATER  AND  SOX NAOH  SOLUTION.  THE  TYPICAL



LIOUID  MASS  FLUX  VALUES ARE 2000-3000 LBS/HR FT2.   A  L/fi  RATIO  OF 11  GAL/1000 SCF IS USED AND PH AT



THE  INLET  IS B.O.  THE FLUE GASES  ENTER THE QUENCHERS AT  600 F  WITH  1000 PPM 302 AND LEAVE THE M-E'S



AT 160  F WITH  LESS  THAN 2B3 PPM 302.  THE  SPENT  LIQUOR IS  SPLIT  INTO  TWO  STREAMS, ONE RECYCLED AS



BOILER  FEED  WATER AFTER REMOVING FLYASH AND SOFTENING,  THE  OTHER  IS  DISPOSED OF IN WASTE-WATER



DISPOSAL WELLS.



     THE ABSORBER  MODULES, DOWNSTREAM  DUCTWORK,  STACK  AND  THE I.D. FAN ARE MADE OF FRP,  WHEREAS THE



PACKING IS POLYPROPYLENE.  THE  QUENCHER SECTION IS  316  SS,  WHEREAS THE SPENT LIQUOR PIPING, CAUSTIC



TANKS,  AND THE CAUSTIC FEED LINES  ARE MILD STEEL.



     REFER  TO FIGURE 14-37 IN SECTION  14 FOR A DETAILED  PROCESS  FLOW  DIAGRAM OF THIS SYSTEM.







                                          OPERATING  HISTORY



THE  MAJOR  OPERATIONAL PROBLEM AREAS ARE!



    1.  THE  QUENCHER  SECTION HAS  SUFFERED SEVERE  CORROSION  DUE TO ACID  ATTACK.



   2.  FRP  LINER DETERIORATES DUE TO MECHANICAL  ABRASION DURING  CLEANING OPERATIONS.  IT NEEDS



       OCCASIONAL  RESURFACING.



   3.  THE  PACKED  BEOS ARE FREQUENTLY  PLUGGED BY FLVA3H.   THE OIL IN  THE NATURAL LIQUOR  HAS CAUSED



       FOULING  OF  THE  PACKED BEDS.



   4.  OCCASIONAL  OVERINJECTION  OF  CAUSTIC HAS RESULTED  IN PLUGGING OF SPRAY NOZZLES BY  SCALE.







1ST  QUARTER-197B    DUE TO THE  LOW 302 REMOVAL  AND  MICH MAINTENANCE COST OF THE ABOVE DESIGN, TEXACO



HAS  UNDERTAKEN A  TEST PROGRAM WH'ICH,  IF 8UCCESFUL,  MILL PHASE OUT THE PRESENT SCRUBBERS BY THE END



OF 1479.  FOR  MORE  INFORMATION  ON  THE PROGRAM SEE THE OTHER TEXACO,  SAN ARDO BACKGROUND INFORMATION



ENTRY  IN SECTION  10 OF THIS REPORT.







2ND  QUARTER-197B    THE AVAILABILITY  OF EACH FGD SYSTEM WAS APPROXIMATELY 94X.  ON AN AVERAGEi ONE



SYSTEM  WAS SHUTDOWN TWO DAYS A  MONTH  FOR  MAINTENANCE.








3RD  QUARTER-1970    THERE WAS NO MAJOR DOWNTIME DUE TO EQUIPMENT OR PROCESS FAILURE.  THE SCRUBBERS



WERE DOWN'  FOR  SCHEDULED MAINTENANCE FOR ABOUT a HOURS PER MONTH REQUIRING ABOUT 24-MAN-HOUR3 PER



UNIT.  GENERALLY  DURING THIS  REGULAR  MAINTENANCE PERIOD THE PACKING  IS REPLACED AND THE INTERNALS



INSPECTED  AND  CLEANED.  TEXACO  IS  CONSIDERING CONVERTING FROM NAOH TO NA2C03 AS THE REAGENT.  NO



TIMETABLE  HAS  BEEN ESTABLISHED  FOR SUCH A  TRANSITION.







4TH OUARTER-197*    OPERATIONAL  PROBLEMS  OF CORROSION IN THE QUENCHER, AND ABRASION AND PLUGGING IN



ABSORBER CONTINUED.   THE  ABSORBERS ARE  MOUNTED  ATOP THE GENERATORS WITH ONLY 1 OR Z FT  CLEARANCE.

-------
                                                                             STATUS TO APRIL  197*



                                      SECTION  9 (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS



TEXACO INCORPORATED;  SAN ARDO,  CALIFORNIA (CONTINUED)





HENCE, THE HEAT LOSSES FROM THE RADIATION SECTION WEAKEN THE FRP SHELL OF THE ABSORBERS.  IN THIS



OUAKTtK,  EACH SCRUBBER HAS SHUT DOWN FOR MAINTENANCE FOR AN AVERAGE TIME OF 109 HOURS.







1ST OUAK1ER-1979    THE SCRUBBERS CONTINUED TO OPERATE THROUGH THIS PERIOD WITH HIGH MAINTENANCE



REQUIREMENTS.  TYPICALLY* A SCRUBBER NOULD BE BROUGHT OFF THE LINE AS THE PRESSURE DROP INCREASED



BEYOND 1U IN. w.G. AND THE 802  REMOVAL EFFICIENCY FALLS BELOW 70X.  THE INTERNALS WOULD BE CLEANED



AND SOMt  1ELLERETTE PACKING RINGS MOULD BE REPLACED.  ON AN AVERAGE A SCRUBBER MOULD BE OONN FOR



tHO DAYS  EVERY MONTH FOR MAINTENANCE.  THIS PLANT HAD OPERATED 3ft CEILCOTE SCRUBBERS, BUT 9 ARE



BEING DISCONTINUED DUE TO POOR  S02 REMOVAL AND HIGH MAINTENANCE COSTS.  THESE 9 UNITS ARE BEING



REPLACED  BY 3 OUCON SCRUBBERS.
                                               119

-------
                                                                              STATUS TO APRIL  1979

                                       SECTION  9 (CONTINUED)

              PERFORMANCE DESCRIPTION FUN OPERATIONAL FliU SYSTEMS UN INDUSTRIAL BOILERS
   INSTALLATION NAME

   INSTALLATION LOCATION

   SOURCE CHARACTERISTICS

   SOURCE RATING



   NUMBER OF SEPARATE FGO UNITS

   NUMBER OF BOILERS btlNG CONTKOLLEO

   SOURCE CAPACITY





   CONTROL SYSTEM VENDOR

   CONTROL PROCESS

   NEW / RETROFIT

   START-OP DATE

   CONTROL SYSTEM STATUS

   802 REMOVAL EFFICIENCY

   PART1COLATE REMOVAL EFFICIENCY

   SLU06E OR BY-PRODUCT DISPOSAL

   CONTROL SYSTEM COST
1EXASGOLF

GRANGER. WYOMING

COAL (U.75X SULFUR)

110,000 SCFM (TOTAL - 2 BOILERS)

600,000 LB/HR STEAM (TOTAL)

 2

 2

70 MM (EQUIVALENT); TOTAL -  I BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERWISE,  2000 SCFM = 1  EQUIVALENT MM.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY  FACTOR  IN MODULE SIZING.)

SHEMCO INC.

SODIUM CARBONATE SCRUBBING

NEW

SEPTEMBER. 1976

OPERATIONAL

90X (660 PPM a INLET)

99.jt (HOT-SIDE ESP IN/PRECEDING MECHANICAL  COLLECTOR)

HASUNATEk TREATMENT

SEE SECTION 13 FOR DETAILED  ECONOMIC INFORMATION
                                        BACKGROUND INFORMATION

     TEXASGULF INC. HAS BEEN OPERATING A MEW SODA ASH PLANT  (1 MM  TONS/YR)  AT  GRANGER,  WYOMING,  SINCE

 SEPTEMBER 1976.  TWO BOILERS GENERATE A TOTAL OF 600,000 LBS/HR SATURATED  STEAM  at  300  PSIG.

 ONIT  EFFICIENCY IS 85X WHEN BURNING WYOMING SUB-BITUMINOUS  COAL,  WHICH  HAS 13.97X  MOISTURE,  6.43X

 ASM,  0.7bt SULFUR, AND A HEATING VALUE OF IS 10,424 BTU/LB  ON AN  AS-RECEIVED  BASIS.  EACH  BOILER

 BURNS APPROXIMATELY 25,000 LB/HR OF THE COAL.

    AFTER FLUE  GASES LEAVE EACH BOILER, (156,150 ACFM d ibO F)  IHEY PASS THROUGH A MECHANICAL

 COLLECTOR,  ESP,  ECONOMIZER,  AND WET SCRUBBER.  (THE ECONOMIZER  IS LOCATED  AFTER  THE  PRECIPITATOR

 BECAUSE  THE ASH FROM WESTERN COAL IS COLLECTED MORE EFFICIENTLY WHEN  THE GAS  IS  HOT).   THE CYCLONE

 AND ESP  TOGETHER HAVE  A  PARTICULATE REMOVAL EFFICIENCY  OF 99.3X.  THE SCRUBBING  UNITS,  INSTALLED

DOWNSTREAM  OF THE  ECONOMIZER,  w£K£  SUPPLIED BY SwEMCO IN SEPTEMBER 1976.   THE  SYSTEM CONSISTS OF

A QUENCHER,  A SIEVE  TRAY  ABSORBER (15 FT DIA X 20.5 FT  HIGH)  AND  A BYPASS.  THE  ENGINEERING  WORK

WAS DUNE  BY  A.G. MCKEE *  CO.   FLUE  6AS IS SPRAY-COOLED  FROM 350 F TO  125 F  AS  IT ENTERS  THE

QUENCHER  WITH 19 PVC NOZZLES  ON FIBERGLASS HEADERS  AND  IS DIRECTED INTO THE CIRCULATING  LIQUOR

IN THE RESERVOIR.   THE GAS BUBBLES  UP THROUGH THE LIUUUR, ENTERS  THE  ADJACENT  ABSORBER,  TRAVELS

UP THROUGH  TWO SIEVE TRAYS,  AND A MESH TYPE  MIST ELIMINATOR UF  TEFLON AT THE  TOP.  SCRUBBING

LIQUOR (700 GPM  TO  THE ABSORBER,  300  GPM TO  THE  QUENCHER) IS REC1HCULATED  FROM THE SCRUBBER  PUMP

TANK WHICH RECEIVES THE SCRUBBER  EFFLUENT  (1023  GPM).   PH VALUE IS MAINTAINED  Al 6.3.   A CONSTANT
                                               120

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9 (CONTINUED)




             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGO SYSTEMS ON INDUSTRIAL BOILERS



TEXASGULFl GRANGER, WYOMING (CONTINUED)






BLEED-OFF (350 TO 487 Lfl/MIN)  CONTAINING 8X OF SODIUM SALTS IS PURGED TO A HOLDING POND FOR EVAPORA-




TION.  THE CLARIFIED MAKEUP MATER (60 TO 93 GPM) IS USED FOK M-E MASHING (IS GPM) AND QUENCHER SPRAT



(45 TO 66 GPM).  MAKEUP SODA ASH 301 BY WEIGHT. IS FED FROM A LIQUOR HEAD TANK TO THE SCRUBBER PUMP



TANK AT A MINIMUM RATE OF 56 LS/MIN AND MAX. RATE OF 119 LB/MIN.




    EACH A8SORBER IS DIVIDED VERTICALLY INTO TWO SECTIONS, ONE OF WHICH HAS A DAMPER AT THE TOP.




THIS PERMITS CURTAILMENT OF GAS FLOW THROUGH HALF OF THE UNITS AT LOW LOADS.  THE ABSORBER,




THEREFORE, CAN OPERATE AT THE DESIGN EFFICIENCY MHEN THE BOILER PRODUCES FROM 25X TO 100X OF ITS




RATED OUTPUT.  THE ABSORBER BYPASS ALLOWS UP TO 25X OF THE INCOMING HOT FLUE GAS TO BE DIVERTED.




TYPICALLY, TEXASGULF USES THE BYPASS TO KEEP THE FLUE GAS IN THE STACK 10 F WARMER THAN THAT AT THE




SCRUBBER OUTLET.  THE ABSORBERS ARE MADE OF CARBON STEEL nITH FLAKED GLASS LINING AND THE TKAYS ARE




OF INCONEL 625.  THE HECIRCULATION TANKS ARE MADE OF FRP AND THE STACK (7.5 FT 10 X 150 FT HEIGHT)




IS DOUBLEWALLEDr INSULATED STEEL TYPE WITH FLAKED GLASS COATING BY CEILCOTE COMPANY.




    REFER TO FIGURE 14-38 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.








                                        OPERATING HISTORY



    THE THROAT IN ONE OF THE QUENCHERS WAS REPLACED BY THAT OF INCONEL 625 BECAUSE OF CORROSION




PROBLEMS.








1ST QUARTER-1978    THE OUTLET DUCTWORK, WHICH WAS CORRODED DUE TO THE ACID CONDENSATE, WAS TO BE




REPLACED.  THE SYSTEM OPERATED WITHOUT ANY MAJOR PROBLEMS.








2ND OUARTER-1978    DURING A MAJOR ELECTRICAL TURNAROUND, THE SCRUBBER MODULES WERE CLEANED AND



REPAIRED, SLUDGE FROM THE TRAYS WAS REMOVED AND THE OUTLET DUCTWORK WAS REPLACED BY 304 S3.  THE S02




MEASURING INSTRUMENTS WERE BEING UPGRADED BY LEAK SIEGLEU, THE SUPPLIER.








3RD QUARTEH-1978    DURING THE REPORT PERIOD, THE BOILER AND FGD SYSTEM WERE OOnN TWICE FOR




SCHEDULED INSPECTION OUTAGES.   DOWNTIME WAS 4 DAYS FOR ONE MODULE AND 2 DAYS FOR THE OTHER.  SOME




MINOR PLUGGING WAS OBSERVED DURING THE INSPECTION PERIODS.








4TH QUARTER-19/a    DURING THIS PERIOD, OUTAGE OCCURRED UN NO. 2 BOILER FUR A DAY IN OCTOBER.  IN




NOVEMBER, THE NO. 2 BOILER WAS DOWN FOR SCHEDULED INSPECTION FOR 2.5 DAYS.  DURING THIS TIME, THE




TRAYS AND INTERIOR OF THE SCRUBBER WERE CLEANED.  SOME OF THE PIPING LEADING TO TRAYS WAS REPLACED.




SOME OF THE PLUGGED NOZZLES IN THE QUENCHER WERE EITHER CLEANED OR REPLACED.  THE RELIABILITY INDEX




VALUE FOR BOTH SCRUBBERS WAS ABOUT 100S.
                                               121

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION  9  (CONTINUED)



             PERFORMANCE DESCRIPTION FOR OPERATIONAL FGD SYSTEMS ON INDUSTRIAL BOILERS



TEXASGULF? CHANGES, NYOMING  (CONTINUED)





1ST QUARTER-1979    DURING THE PERIOD, BOTH BOILERS HERE OOMN FOR ONE DAY EACH IN MARCH FOR



SCHEDULED MAINTENANCE.  ON THESE DAYS, THE ABSORBER DRAIN LINES NERE EXTENDED.  THESE LINES (10 IN



OIA, INCONEL 625) HERE NOT IMMERSED PROPERLY IN THE RECIHCULATION TANK LIQUOR.  HENCE, SOME OF THE



FLUE SAS MOULD BYPASS INTO THE RECIRCULATION TANK WITH THE DROP OF LIQUID LEVEL IN QUENCHER.



    IN ADDITION, A NEM INSTRUMENTATION STRATEGY NILL BE INCORPORATED SHORTLY.  SO FAR, THE



RECIRCULATION PH HAS BEEN MEASURED BY ANALYZING SAMPLES TAKEN ONCE EVERY S HOURS.  THE NEW SCHEME



HILL HAVE INDICATOR/CONTROLLERS FOR BOTH DENSITY  AND PH OF RECIRCULATION LIQUOR.  THE APPROXIMATE



SET POINTS MILL BE 1.08 AND  6.5 RESPECTIVELY.  DENSITY NILL BE THE PRIMARY PARAMETER CONTROLLING THE



FLO* OF MAKEUP NA4C03 LIQUOR.  ONCE THE DENSITY IS STABILIZED, THE PH CONTROLLER NILL SUPERSEDE THE



DENSITY CONTROLLER IN ADJUSTING THE MAKEUP LIQUOR- FLON RATE.



    THE RELIABILITY VALUES FOR BOTH THE SCRUBBERS WERE 100* FOR THE PERIOD.

-------
                                                                              STATUS  TO APRIL   1979
                                            SECTION 10
            OI-SIS* iNFUrtftAllUN FOK UNO!-* CUNSTKUCIION FGD SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION NAME
  IHSTALLATIUN LOCATION
  SUUKCt CHAKACTEKISUCS
  SUUMC6
  NUMBtK (Jf SEPARATt FSJ UNITS
  NUMH6R OF DUILEMS BEING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VtNUOK
  CUNIHUL PKOUSS
  N£« / RtTHOFIT
  START-UP OAIE
  CONTROL SYSTEM STATUS
  SU2 REMOVAL EFFICItNCiT
  PARTICULATE REMOVAL EFFICIENCY
  SLUDGE UR dY-PRUDUtT UlSPOSAL
  CUNTRUL SYSTEM COST
ARCU/POLYMERS, INC.
MONACA, PENNSYLVANIA
COAL (3.US 9ULFOR)
30b,000 SCFM CTUTAL - 3 BOILERS)
900,000 LB/HR STEAM it 700 PSIG AND 700 F.
 3
 3
152 Hw (fcl)UIVALENT)» TOTAL - 3 BOILERS
(FOR TnIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM * 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
FMC ENVIRONMENTAL EQUIPMENT
DOUBLE ALKALI (CONCENTRATED)
RETROFIT
JUNE, 1900
CONSTRUCTION
90X (l.dOO PPM H INLET)
99.SX
OEftATERED SLUKRY TU LANDFILL
FLYASH ADDITION TO OtNATEKEO CA303/CA804 FILTER CAKE,
THEN TO LANDFILL.
SEE SECTION 13 FON DETAILED ECONOMIC INFORMATION
                                        BACKGROUND INFORMATION
    AMCO/PULYMERb, UEAVER VALLEY PLANT LOCATED NEAM hUNACA, PENNSYLVANIA, AftARDEO  A CONTRACT
IN JUNE 1970 TO FMC TO INSTALL THREE FOUR-STAGE DISC CONTACTOR SCRUBBERS.  THE SYSTEM
MILL UTILIZt THE FMC DOUBLE ALKALI PROCESS WITH 1HE SCRUBBERS SHARING A COMMON REGENERATION UNIT.
    THREE BOILEKS GENERATE PROCESS STEAM USED TO OPERATE A TURBINE NHICH GENERATES 1«  TU 20
KVA (CAPACITY 3& KVA).  THE STtAM HATE FOR EACH BOILER IS 300,000 LB/HR i 700 PSIG AND 700 F.
TOTAL HEAT INPUT IS 1100 MM BTO/HR.  PULVERISED COAL (3.0k SULFUR) IS THE FUEL USED NITH AN ASH
.CONTENT OF IbX.  IT HAS A HEAT VALUE OF 12,000 8TU/L8 <* 4-6X MOISTURE CONTENT.   THE COST FOR  THE
COAL IS SU.04/TON.
    KOPPERS ESP'S PRLCLEAN THE FLUE GAS BEFORE II ENTERS THE SCRUBBERS AT A RATE OF IbSrOOO ACFM
(EACH) 4 400 F.  THE INLET CONCENTRATION OF PAM1CULATES TO THE ESP'S IS 5 GR/SCF. GAS ENTERING  THE
SCRUBBERS NlLL HAVE AN 302 CONCENTRATION OF APPROXIMATELY 1800 PPM.  THE SCRUBBERS (17 FT OIA  X 62
FT  HEIGHT) KITH 4 DISCS AND DONUTS (EACH) MILL BE CONSTRUCTED OF CARBON STEEL HITh FLAKE GLASS
LINING (CEILCOTE) AND THE MIST ELIMINATORS (1 FOR EACH SCRUBBER) ARE SINGLE STAGE  CHEVRON PAD
TYPE CONSTRUCTED OF PVC PLASTIC WITH PROVISIONS FOR A SECOND STAGE.  EACH SCRUBBER WILL EXHAUST THE
TREATED FLUE « 13S F TU INDIVIDUAL INSULATED STACKS LINED WITH FRP.  ASSOCIATED  HITH EACH STACK IS A
                                               123

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION 10 (CONTINUED)



            DESIGN INFORMATION FOH UNDER CONSTRUCTION FGD SYSTfcMS ON INDUSTRIAL BOILERS



ARCO/POLYMEKS* INC.; MONACA, PENNSYLVANIA (CONTINUED)





RCHEATER USING STEAM HEATED AMblENT A Ik KITH A HEHEAT OF iS H.  THE SCNUBBEK MILL HANDLE IOOX OF THE



FLUE CASES WITH BY-PASS ONLY AVAILABLE FOR EMERGENCIES.  THE L/C RATIO FOR THE SCRUBBERS IS APPROXI-



MATELY 10.  THE MESTINGHOuSE P.O. FANS "ILL BE OF CARBON STEEL AND PUMPS OF RUBBER-LIMED CARBON



STEEL.  THE DUCTING LEADING TO AND FROM THE SCRUBBERS MILL BE OF FIBERGLASS LINED (CEILCOTE) CARBON



STEEL AND F«P, RESPECTIVELY.



    CALCIUM SULFATE WASTE GENERATED AT A KATE OF 17*500 LB/HR KITH 55* SOLIDS CONTENT *ILL BE



HAULED BY TRUCK TO A DISPOSAL SITE.



     REFER TO FIGURE 14-2 IN SECTION 10 FOR A DETAILED PROCESS FLON DIAGRAM OF THIS SYSTEM.







                                        OPERATING HISTORY



3RD OUARTER-1978    CONSTRUCTION IS TO BEGIN IN SEPTEMBER 1978.







«TH OUARTER-197B    CONSTRUCTION OF THE PLANNED FGD SYSTEM STARTED IN SEPTEMBER 1976.







1ST OUARTER-1979    THE CONSTRUCTION OF THE PLANNED FGO SYSTEM STILL IN EARLY STAGES, CONTINUES



A3 SCHEDULED.

-------
                                                                             STATUS 10 APRIL  1979

                                      SECTION 10 (CONTINUED)

            DESIGN  INFORMATION FOR UNDER CONSTRUCTION FGO SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION  NAME

  INSTALLATION  LUCAT1UN

  SOURCE  CHARACTERISTICS

  SOURCE  RATING



  NUMBER  OF  SEPARATE  FGO UMTS

  NUMBER  OF  TOILERS bEING CONTROLLED

  SOURCE  CAPACITY
  CONTROL  SYSTEM  VENUUK

  CONTROL  PROCESS

  MEN  / RETROFIT

  START-UP DATE

  CONTROL  SYSTEM  STATUS

  S02  REMOVAL  EFFICIENCY

  HATER MAKE-UP

  3LUOSE OR  bY-PROOUCF DISPOSAL

  CONTROL  SYSTEM  COST
CHEVNON U.S.A. INC.

BAKEhSUELD, CALIFORNIA

OIL (1.1* SULFUR)

146,000 SCFM (TOTAL - 12 BOILERS)

ISG.OOO ACFM a 500 F, FUR EACH OF 2 FGO SYSTEMS

 2

12

73 MM (EUUIVALtfcl)T 1UTAL - 12 bOlLEMS

600 KM Blu/HR (TOTAL » 12 BOILtKS) 6 BOILtRS/FGD SYSTEM)

(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2UOO SCFM x  1 EQUIVALENT MM.
THIS IS BECAUSE GAS KLUnt KATE IS THE PRIMARY FAC10R IN  MODULE SIZING.)

KOCH ENGINEERING

SODIUM CAttbONATE SCRUBBING

RETROFIT

JULY, 1979

CONSTRUCTION

90Z (660 PHM ol INLET)

12 - 13 GPM

NASTEftATEK TREATMENT

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

    CHEVRON U.S.A.  HAS  AN  OIL  SITE AT BAKERSFIELO,  CALIFORNIA. THERE ARE ABOUT SO STEAM GENERATORS

HHICH  BURN  1.1X  CftUOE OIL.   EACH GENERATOR IS RATED AT SO MM EtTU/HR.  THE STEAM IS USED FOR ENHANCED

OIL  RECOVERY FROM THE OIL  NELLS.

    A  CONTRACT HAS  AHAROEU  TO  KOCH ENGINEERING TO CONSTUCT TftO MORE FGD SYSTEMS.  THE DESIGN MILL BE

SIMILAR  TO  EXISTING NA2C03  SCRUBBING UNITS.   REFER  TO SECTION 9 OF THIS REPORT FOR UETAILS ON THESE

F6D  SYSTEMS.

                                        OPERATING HISTORY

    4TH  OUARTER-1978.   THE  FGD SYSTEMS ARE UNDER DESIGN.  THE CONSTRUCTION MILL START IN JANUARY

1979.  THE  START-UP IS  STILL EXPECTED TO BE  APRIL,  1979.



1ST  OUARTER-1979    CONSTRUCTION HAS STARTED ON 30TH THE FGD SYSTEMS DURING THIS PERIOD.  SOME

DELAYS IN DELIVERY  OF STEAM GENERATORS AND ANCILLARY EQUIPMENT HAVE PUSHED THE EXPECTED STARTUP TO

JULY 1979.
                                               125

-------
                                                                             STATUS TO APRIL  1979
                                       SECTION  10  (CONTINUED)
             DESIGN  INT-URMAUON FOR  UNDER  CONSTRUCTION FUO SYSTEMS ON  INDUSTRIAL BOILERS
   INSTALLATION  NAME
   INSTALLATION  LOCATION
   SOOMCC  CHARACTERISTICS
   SOOMCE  KATlNb
   NOMBER  Qf  SEPARATE  KiU ONUS
   NUMBER  OF  BOILERS BEING CONTROLLED
   SOOMCE  CAPACITY


   CONTROL SYSTEM VENDOR
   CONTROL PROCESS
   NEH  /  R6THUFIT
   START-OP OATfc
   CONTROL SYSTEM STATUS
   SU2  HEMUVAL EFFICIENCY
   SLUDGE  OR  BY-PRODUCT  DISPOSAL
   CONTROL SYSTEM COST
bRISSOM AIR FORCE BASE
BUNKtrt HILL, INDIANA
COAL (3.UX - J.bX SULFUR)
ja.OOO SCKh (IOTAL - i BOILERS)
 1
 3
16 M(N (EUUIVALENT)i TOTAL  - 1 BOILERS
(FUR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM * 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLO* RATE 13 THE PRIMARY FACTO* IN MODULE SIZING.)
NEPTONE AIRPOLi INC.
DOUBLE ALKALI (CONCENTRATED)
1 NEM i RETRO
NOVEMBER, 1479
CONSTRUCTION


DEwAIERED SLURRY 10 LANDFILL
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
     AT  GR1SSOM AIR  FORCE  BASE  NEAR  BUNKER HILL, INDIANA, THE AIR FORCE HAS INITIATED A PROJECT MHICH
 INCLUDES  THE  ERECTION  OF  A  NEM 6S.OOO Ltf/HR COAL-FIREO BOILEH AND AN FGD SYSTEM FOR THE NEH UNIT AND
 TWO  EXISTING  40*000 Ld/riR COAL-FIRED UNITS.  THE NAVY IS THE MILITARY CONSTRUCTION AGENT FOR THE
 PROJECT AND ARNOLD  M.  DIAMOND  HAS THE OVERALL CONSTRUCTION CONTRACT.  COAL FOR THE BOILERS IS
 TYPICALLY  SOUInER*  INDIANA.  nIGH SULFUR COAL MllH  A SULFUR CONTENT OF 3-3.5 PEfcCtNT AND AN AVERAGE
 HEATING VALUE OF  11,500 BlU/Ld.  THE BOILERS NORMALLY OPERATE wITH ABOUT 40X EXCESS AIR.
     CONSTRUCTION  HAS BEGUN  0.1  A N£« CONCENTRATED DOUBLE ALKALI FGO SYSTEM SUPPLIED BY AIRPOL
 INDUSTRIES.   THE  SYSTEM *ILL HAVE A GUARANTEED MAXIMUM su« OUTLET CONCENTRATION OF
 1.8  LB/MILLION  UTU  AND A  MAXIMUM PARTICULAR CONCENTKATIUN OF 0.171 LB/MILLION BTU.  FLUE GAS FROM
EACH BOILER MILL  PASS  IriROUGri  A MECHANICAL COLLECTOR.  THE GAS FROM ALL THREE BOILERS HILL THEN BE
MANIFOLOEO TOGETHER  ANO PASS THROUGH TWO PARALLEL ABSORBER TRAINS. EACH CAPABLE OF HANDLING SOS
OF THt  FLUE GAS.  THE MAXIMUM  FLOW  RATE IS 00.473 ACFM 4 4faJ F.
    THE AIRPOL SYSTEM CONSISTS OF i PARALLEL Jib S3 VENTURI 3CRUBdERS> EACH FOLLOWED BY A
 CYCLONIC SEPARATOR  AND STUB STACK.  THERE IS A COMMON RECIRCULAT10N TANK MADE OF 316 STAINLESS
 STEEL AND TNU 600 GPM RUBBER-LINED RECIRCULAUON PUMPS.  THE L/G RATIO IS IS GALLONS/1000 ACFi
 KITH A SLURRY INLET TEMPERATURE OF 13b F AND A PH OF BETrtEEN S ANO 7.  RECIRCULAT1UN PIPES MILL
 «E MADE OF FRP.
     A 100-eOU GPM BLEED STREAM FROM THE RECIRCULATION TANK GOES TO A 316 SS LIME REACTION TANK
HHERE THE 30DIUM SULFITE/SULFATE IS REACTED WITH SLAKED LIME PRODUCING CALCIUM SULFATE ANO
                                               126

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION 10 (CONTINUED]
            DESIGN INFORMATION FOR UNDER CONSTRUCTION FGO SYSTEMS ON INDUSTRIAL BOILERS
GKISSOM A1H FORCE (JASE» BUNKER HILL* INDIANA (CONTINUED)
REGENERATING THE SODIUM HYDROXIDE.  FROM THE REACTION TANK THE MIXED SLURRY FLONS TO A THICKENER/
CLAMIFIEK, WHERE INSOLUBLE CALCIUM COMPOUNDS ARE SEPARATED FROM THE CLEAR OVERFLOW CONTAINING THE
REGENERATED NAOri.  THE CLARIFIES uVERFLOw IS RETURNED TO THE ABSORBER* WHILE THE UNDERFLOW IS
RtACTtO ONCE AGAIN KITH LIME IN A PIPELINE MIXER TO PRECIPITATE ANY RESIDUAL SULFITE AS SULFATE.
THE SLUH*Y IS THEN FILTERED IN A ROTARY FILTER* AND THE FILTRATE IS RETURNED TO THE REACTION TANK.
THE FILTER CAKE WILL BE LANOFILLED.  THE TANKS MILL BE MADE OF 316 S3 AND THE PIPING OF FRP.  THE
LIME STORAGE TANK AND SLAKER MILL BE CARBON STEEL.

-------
                                                                             STATUS TO APRIL  1979
                                       SECTION 10  (CONTINUED)
            DESIGN  INFORMATION  FOR  UNDE* CONSTRUCTION FUO SYSTEMS ON INDUSTRIAL BOILERS
INLAND CONTAINER CORPORATION
NEW JOHNSONVILLE, TENNESSEE
MOOOX5PENT LIvlUOR l<3.0» SULFUR)
194,000 SCFM (t BOILER)
256>000 ACFM a 400 F.
 I
 1
7? MM (EQUIVALENT)
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM s 1 EQUIVALENT MN.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
NhPTUNE AIRHOL INC.
AMMONIA SCRUBBING
RETROFIT
MAY, 1979
CONSTRUCTION
90S (OES1GN)
95.71 (DESIGN)
CLOSED LOOP - UNTREATED SCRUBBING LIUUOR KECYCLEO
AMMONIUM SULFITE/BISULFITE RECYCLED TO PULP PROCESS
RECOVERED SOLUTION USED AS MAKE-UP TO COOKING LIQUOR
IN THE PULP MILL.
SEE SECTION 13 FOR OETAILEO ECONOMIC INFORMATION
  INSTALLATION
  INSTALLATION  LOCATION
  SOURCE  CHARACTERISTICS
  SOURCE  RATING

  NUMBER  OF  SEPARATE  FGO  ONlfS
  NUMBER  OF  BOILERS BEING CONTROLLED
  SOURCE  CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW  / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  S02  REMOVAL EFFICIENCY
  PARTICULAR H6MOVAL EFFICIENCY
  SLUDGE  OR  BY-PRODUCT DISPOSAL
  CONTROL  SYSTEM  COST
                                        BACKGROUND INFORMATION
     THE  INLAND  CONTAINER  CORPORATION IN NEW JOHNSONVILLE, TENNESSEE* IS A MANUFACTURER OF MEDIUM
GRADE CORRUGATED  PAPER.   THE  MILL  HAS A 8ABCOCK & MlLCOX BOILER FIRING SPENT LIUUOR AND 90S WOOD
NASTE (<3.0X  SULFUR)  AT A RATING OF 300,000 LB/rIK STEAM MlTH 542 MILLION BTU/HR HEAT INPUT.
     AN AIRPOL DESIGNED AMMONIA  SCRUBBING SYSTEM "ILL BE UStU TO CONTHOL SO* AND PARTICULATE
EMISSIONS.  A VENTURI SCRUBBER  AND SEPARATOR/ABSORBER COMBINATION MILL HANDLE A FLUE GAS VOLUME
OF 250,000 ACFM 4 400 F NllH  24S MOISTURE CONTENT.  THE VENTURI SCRUBBER 18.75 FT DIA X 24 FT
HEIGHT)  AND SEPARATOR/ABSORBER  (21 FT DIA X 66 FT  HIGH) «ITH A MIST ELIMINATOR WILL BE CONSTRUCTED
OF 316L SS.  THE PRESSURE DROP  ACROSS THE VENTURI MILL BE 20 IN M.G.  THE L/G RATIOS FOR THE VENTURI
SCRUBBER ANO SEPARATOR/ABSORBER MILL BE 10 AND S GAL/1000 ACF RESPECTIVELY.  STUB STACK (10.75 FT
OIA X 43 FT HEIGHT) AND RECIRCULATION TANK MILL BE 316L SS WHILE FO FAN MILL BE CANBON STEEL.
    THE  COST OF THE VENTURI SCRUBBER, SEPARATOR AND STUB STACK IN 1970 DOLLARS IS $350,000.
                                               128

-------
                                                                              STATUS  TO  APRIL   1979

                                      SECTION 10 (CONTINUE)

            DESIGN INFORMATION F UK UNDER CONSTRUCTION FGD SYSTEMS UN  INDUSTRIAL  BOILERS
  INSTALLATION  NAME

  INSTALLATION  LUCAUUN

  SOURCE  CHARACTERISTICS

  SOUKCfe  RATING



  NUMBER  OF  SEPARATE  F(JO UMTb

  NUMBER  UF  dUILEKS BEING CONlftClLLEL)

  SOURCE  CAPACITY




  CONTROL  SYSfE*  VENOUK

  CONTROL  PROCESS

  nlEN  / RETKUFiT

  START-UP DATE

  CONTROL  SYSTEM  STATUS

  SU
-------
                                                                             STATUS TO APRIL  1979
                                      SECTION 10 (CONTINUED)
            DESIGN INFORMATION FOR UNDER CONSTRUCTION FGD SYSTEMS ON INDUSTRIAL BOILERS
MOBIL OIL COMPANY; BUTTONNILLOH* CALIFORNIA (CONTINUED)

                                        OPERATING HISTORY
«TH QUARTER-197B    THE START-UP DATE HAS BEEN EXTENDED TO FEBRUARY OF 1979, DUE TO DELAYS IN
AWARDING SEPARATE CONTRACTS FOR PIPING AND OTHER WORK.

1ST OUARTER-1979    CONSTRUCTION HORK IS IN THE FINAL PHASES ON THE 7 FGD SYSTEMS.  STARTUP IS
NOW PROJECTED TO BE EARLY APRIL 1979.
                                               130

-------
                                                                             STATUS TO APRIL   1979
                                      SECTION >0 (CONTINUED)
            DESIGN  INFORMATION FOR ONOER CONSTRUCTION FGO SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION  NAME
  INSTALLATION  LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING

  NUMBfcK Of-'  SEPARATE  FGU  UNITS
  NUMBER OF  bUILERS bfclNG CONIKULLEU
  SOURCE CAPACITY


  CONTROL  SYSTfch  VENUUR
  CONTROL  PROCESS
  MEN / RETROFIT
  START-UP OATt
  CONTROL  SYSTEM  STATUS
  S02 REMOVAL EFFICIENCY
  CONTROL  SYSTEM  CUST
PHILLIP MOKRIS, INC.
CHESTERFIELD, VIRGINIA
CUAL II.HI SULFUR OESIG.M)
39,000 SCFM (TOTAL - 1 BOILER)
bb.OOO ACFM o> i50F, 2(10,0(10 LB/HR STEAM
 1
 1
20 Mw (EQUIVALENT); 237 MM BTU/Hk
(FOR THIS REPuKl, UNLESS STATED OTHERWISE, 
-------
                                                                             STATUS TO APRIL  1979



                                      SECTION 10 (CONTINUED)




            DESIGN INFORMATION FOR UNDER CONSTRUCTION FGD SYSTEMS ON INDUSTRIAL BOILERS




PHILLIP MORRIS^ INC.I CHESTERFIELD. VIRGINIA (CONTINUED)






MADE OF FRP AND THE NOZZLES 16 PER STAGE) AkE 316 STAINLESS STEEL.  ALL PUMPS ARE RUBBER-LINED.




RECIRCULATION LINES ARE 316 38 AND THE MIST ELIMINATOR IS POLYPROPYLENE.



    REFER TO FIGURE 14-30 IN SECTION 14 FOR A DETAILED PROCESS FLOrt DIAGRAM OF THIS SYSTEM.
                                               132

-------
                                                                             STATUS TO APKIL  1979
                                      SECTION 10 (CONTINUED)
            DESIGN INFORMATION FUR UNOEK CONSTRUCTION FliD SYSThMS ON INDUSTRIAL UUILEHS
  INSTALLATION NAME
  INSTALLATION LUCAIIUN
  SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBER UF SEPARATE FGO UNITS
  NUMBER UF BOILERS hEING CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  S02 REMOVAL EFFICIENCY
  WATER MAKE-UP
  SLUDGE OR BY-PRODUCT DISPOSAL
  CONTROL SYSTEM COST
SANTA FE ENERGY COkP.
BAKERSFIELU, CALIFORNIA
OIL (1.5X SULFUR)
70,000 SCFM (1U1AL - 8 BOILERS)
310 MM BTU/HH (TOTAL - a BOILERS)
133,«00 ACFM 01 bbO F U01AL - « BUILER3)
 1
 B
35 MW (EQUIVALENT)I TOTAL - a STEAM GENERATORS
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 8000 SCFM « 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLUM RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
FMC ENVIRONMENTAL EQUIPMENT
DOUBLE ALKALI (CONCENTRATED)
NEW
MAY, 1979
CONSTRUCTION
9bX (710 PPM a) INLET)
71 UPM
DEWATERED SLURRY TO LANDFILL
SEt SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                        BACKGROUND INFORMATION
    SANTA FE ENERGY CORP., FORMERLY CHANSLON WESTERN OIL co,, AS AN ENHANCED OIL RECOVERY SITE NEAR
BAKEKSFIELO, CALIFORNIA.  THE OIL PRODUCTION INVOLVES INJECTION OF STEAM IN THE UlL WELLS, DECANTA-
TION OF OIL FROM OIL-WATER MIXTURE, AND PURIFICATION OF UlL IF NECESSARY.  THE CRUDE OIL PRODUCED BY
THIS PROCESS HAS APPROXIMATELY l.bX SULFUR.  A PART OF THE OIL PRODUCED IS USED AS A FUEL FOR THE
BOILERS WHICH GENERATE THE NECESSARY PROCESS STEAM.  THERE ARE SEVERAL BOILERS UN THE SITE, MANY OF
rtHICH ARE RATED AT SO MM BTU/HR.  THE BOILERS ARE CLASSIFIED AS "STEAM GENERATORS" BECAUSE OF THEIR
SIZE, PORTABLE NATURE, AND LONtR DUALITY OF STEAM (80S) PRODUCED.
    EIGHT OF THE STEAM GENERATORS, MITH A TOTAL HEAT OUTPUT UF 310 MM BTU/HR, ARE BEING CONSTRUCTED
ALONG WITH A NEW, FMC DOUBLE-ALKALI ICUNCENIRATEO) FGO SYSTEM.  THE FLUE GASES FROM THE EIGHT STEAM
GENERATORS ARE MANIFOLDED TOGETHER (133,400 ACFM d 550 F), AND PASS THROUGH A PH£SATUhATOK AND AN
A6SOMBER (IS FT DIA X 35 FT HIGH) WITH FOUR OISC-AND-DONUT TRAYS.  THE RECIRCULATION LIUUOR PH IS
MAINTAINED AT 6.S, AND A L/G RATIO OF 8-10 GAL/1000 SCF IS USED.  THE FLUE GASES PASS THROUGH A
CHEVRON MIST ELIMINATOR TO A STACK.  A CONSTANT BLEED-OFF STREAM (60 GPM) IS TAKEN 10 THE REACTION
TANK NHERE IT REACTS WITH LIME SLURRY TO REGENERATE SODIUM HYDROXIDE.  THE CALCIUM SULFIU/SULFATE
SLURRY IS SENT TO THE THICKENER, VACUUM FILTER AND LANDFILL.
     REFER TO FIGURE 14-32 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM UF THIS SYSTEM.
                                               133

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION 10 (CONTINUED)
            DESIGN INFORMATION FOR UNDER CONSTRUCTION FGO SYSTEMS-ON INDUSTRIAL BOILERS
SANTA FE ENERGY CORP.I flAKERSFI£LD» CALIFORNIA (CONTINUED)

                                        OPERATING HISTORY
3RD OUARTER-1978    THE PLANT IS HEARING COMPLETION OF CONSTRUCTION.  THE COMMISIONING ACTIVITIES
MILL BE UNDERWAY SOON.

«TH QUARTER-1978    CONSTRUCTION MORK HAS BEEN HELD UP PRIMARILY DUE TO DELAYS IN SHIPMENT OF
ELECTRIC CONNECTIONS AND EQUIPMENT.

1ST QUARTER-1979    THE FGO SYSTEM CONSTRUCTION IS EXPECTED TO 96 COMPLETED BY THE END OF THIS
QUARTER EXCEPT FOR THE INSTALLATION OF MANIFOLDED DUCTMORK.  STARTUP OF THE GENERATORS MAY FURTHER
OELAY THE FGD STARTUP DATE.
                                               134

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION 10 (CONTINUED)
            DESIGN  INFORMATION. FOR UNDER CONSTRUCTION KGU SYSTEMS Urt INDUSTRIAL BUILtRS
  INSTALLATION  NAME
  INSTALLATION  LOCATION
  SOURCE  CHARACTERISTICS
  suuHCt  RATING

  NUMBER  Of  SEPARATE  KGU UNITS
  NUMBER  OF  BOILERS HElUG CONTROLLED
  SOURCE  CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW  / RETROFIT
  START-UP JATE
  CONTROL SYSTEM STAtUS
  902  REMOVAL EFFICIENCY
  SLUDGE  OH  BY-PRODUCT  OISPUSAL
  CONTROL SYSTErt CUSI
ST. JOE ZINC CO.
MUNACA, PENNSYLVANIA
CUAL (2.iX - «.SX SULFUR)
ia2,000 SCFM (TOTAL - 1 BOILER)
243,000 ACFM » 300 F.
 1
 t
bU Hn CELECTWIC PQrtEKI NOMINAL PEAK CAPACITY)
IFOR THIS REPORT, UNLESS STAIEO OTHERWISE. 2000 SCFM s 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLOM «AtE IS THE PRIMARY FACTOR IN MUOULE SUING.)
ttUHEAU OF HlntS
CITHAIt PROCESS
WETHOF1T
APKILr 1979
CONSTRUCTIUN
90»»
REGENERAttLt - ELEMENTAL SULFUK PRODUCT
SEE SECTION 13 FOK OETAILEO ECONOMIC INFORMATION
                                      BACKGROUND INFORMATION
    IN  THE  SUMMER  UF  19/7,  CUN3UUCT ION bEGAN AT MONACA, PA. ON A CITRATE PROCESS ItJUkEAU OF MINES)
F6D SYSTEM  FOR  UNt OF I HE TnO 60-Mrt (NOMINAL PtAK CAPACITY) bUILEHS UF THE GEORGE F. NEATON POHEA
PLANT USED  UY ST.  JOE ZINC  CO. TO GENERATE ELECTRICITY FOR A 2INC SMELTER.  ST. JOE HAS A RECIPROCAL
AGREEMENT MlTrt  THE LOCAL UTILITY COMPANY, QUUUESNE LIGHT, MHEREdY ST. JOE CAN SELL UP TO 2S-MW OF
ITS TOTAL 120-MM CAPACITY TU UUUUESNE.  IN RETURNi ST. JOE CAN BUY SUFFICIENT POWER TU MAINTAIN
ELECTRO-SMELTING OPERATIONS IN THE EVENT OF AN EMERGENCY.  THIS FGO SYSTEM IS THE FIRST SMALL COM-
MERCIAL si/t EXPERIMENTAL CITRATE CONTROL SYSTEM BEING BUILT FOR REMOVING SULFUR OIOXIOE FROM
CUAL-F1RE1)  HUMER PLANT STACK GAS.
    UNDER A S12.7  MILLION CUST-SHARING AGREEMENT BETWEEN THE BUREAU AND ST. JOE, COSTS FOR TESTING
THE CITRATE PROCESS FOR A FULL YEAR ARE BEING SHARED ABOUT bU-bO.  THE CITRATE PROCESS MAS DEVELOPED
BY THE  oUREAU  IN THE  ISbv'S TO HELP CURB SULFUR DIOXIOE EMISSIONS FROM dASE METAL SHELTERS.
    THE CITRATE PROCESS DERIVES ITS NAME FROM THE MATER SOLUTION OF SODIUM CITRATE AND CITRIC ACID
USED AS A BUFFERING AGENT UURING SU2 ABSORPTION FROM THE FLUE UAb.   THE ST. JOE PLANT  IS DESIGNED
TO TREAT 231.000 ACFH « 300 F FLUE GAS GENERATED BY FIRING PULVERIZED COAL POSSESSING 2.5-4.SX
SULFUR. 1SX ASH AND AN HHV  OF APPROXIMATELY 12,500 BTU/LB.  THE PLANT MILL MEET THE PENNSYLVANIA AIR
DUALITY REGULATION UF 0.69b LBS OF S02 PER MILLION BTU HEAT INPUT TO THE BOILER.
    THE DEMONSTRATION PLANT, DESIGNED WITH A bOZ TURNDUwN RATIO, UTILIZES A SINGLE PROCESS TRAIN
CONSISTING  UF GAS  COOLING AND SU2 ABSORPTION, SULFUR PRECIPITATION, SULFUR RECOVERY, SODIUM SULFATE
                                               135

-------
                                                                              STATUS  TO  APRIL   1979



                                       SECTION  10  (CONTINUED)




            DESIGN  INFORMATION  FOR  UNDER CONSTKUCT10N FGD  SYSTEMS  ON  INDUSTRIAL  BOILERS



ST. JOE ZINC CO.; MUNACA,  PENNSYLVANIA  (CONTINUED)






REMOVAL*  AND H2S GENERATION  UNIT  OPEKA1IONS.   FLUE  GAS  FROM AN  EXISTING  PRECIP1TATOK ENTERS AN



EOUCTOR TYPE VENTURI  SCRUBBER*  THROUGH  AN F.D. FAN  WHERE. IT is  COOLED  FROM  300 F  TO  120 F BY BOTH




HUMIDIFICATION  AND  SENSIBLE  COOLING.   A BLEED  STREAM IS TAKEN FROM THE VENTUKI RECYCLE  STREAM  TO



PREVENT BUILD-UP OF ASH  AND  ACIDS.  THIS STREAM FLOWS THROUGH A PACKED COLUMN COUNTERCURRENT TO A




STREAM OF AIR WHERE 802  IS STRIPPED FROM THE LIQUID AND RECYCLED TU THE  SCRUBBER.  THE  STRIPPED



LIQUID IS DISCHARGED  TO  AN AGITATOR TANK WHERE IT IS NEUTRALIZED WITH  LIME.   FROM THERE* IT IS PUMP-



ED TO THE EXISTING  ASH POND.




    THE COOLED* CLEANED  FLUE GAS  THEN  ENTERS A PACKED AbSOKBEH  (26 FT  DIA X 65 FT HI6H) MADE OF



FLAKE-GLASS LINED,  CARBON  STEEL,  WHERE  IT FLOWS UPWARD  COUNTERCURRENT  TO THE  DESCENDING CITRATE




SOLUTION. MORE THAN  90X OF  THE S02 IS  REMOVED FROM THE FLUE GAS,  MAINLY AS SULFUROUS ACID, IN THE




PRESENCE  OF THE CITRATE  BUFFER  SOLUTION.  CITRATE SOLUTION LEAVING THE ABSORBER  FLOWS IN SERIES



THROUGH TWO TANDEM  REACTORS  IN  THE  SULFUR RECOVERY  SECTION.  THE CITRATE RECYCLE  STREAM FROM THE



REGENERATION SECTION  IS  COOLED  FROM HI F TO 123 f  BY HEAT EXCHANGE WITH RIVER WATER BEFORE ENTERING



THE ABSORBER.




    SULFUR IS FORMED  8Y  CONTACTING  THE  S02-RICH SOLUTION WITH AN H2S-C02 GAS  FROM THE HYDROGEN



SULFIDE GENERATING UNIT.   OFF-GAS WHICH IS MAINLY COS WITH SMALL QUALITIES OF H2S, CS2, AND COS FROM




THE REACTOR SYSTEM  IS SENT TO THE BOILER FIREBOX FOR INCINERATION  VIA  A  SURGE DRUM.  CRYSTALLINE



SULFUR IS FORMED IN THE  REACTORS  AND SULFUR SLUKRY  FLUWS TO A DIGESTER WHERE  A SMALL STREAM OF




S02-RICH  SOLUTION FROM THE ABSORBER IS REACTED WITH ANY DISSOLVED  OR ENTRAINED H2S IN THE SLURRY



ENTERING  THE DIGESTER.   FROM THE  DIGESTED THE SLURRY FLUWS TU  THE SULFUR FLUTATIUN TANK.  SEPARA-



TION OF THE SULFUR FROM  THE BULK  OF THE SOLUTION IS ACCOMPLISHED BY FLOTATION WITH AIR.  SULFUR




FROTH, CONCENTRATED TO ABOUT 101  SOLIDS, IS SEPARATED FROM THE  TOP OF  THE SOLUTION AND  FLOWS TO THE



SULFUR SLUKRY TANK.




    REGENERATED CITRATE  SOLUTION  IS DRAWN FROM THE  BUT10M  OF THE FLOTATION  TANK  AND RETURNED TO THE




ABSORBER.  SULFUR IS  SEPARATED FROM THE REMAINING SOLUTION BY HEATING  THE SLUKRY  TO ABOUT 200 F WITH



STEAM lit  A SHELL-AND-TUdE  EXCHANGER.   THE MULTEN SULFUR AND TMt  CITRATE  SOLUTION AfcE SEPARATED BY




GRAVITY IN A PRESSURUEO,  STEAM-JACKETED DECANTER VESSEL.  THE  MULTEN  SULFUK  IS  DISCHARGED



CONTINUOUSLY FROM iHt BOTTOM t»Y INTERFACE LEVEL CONTROL AND FLOWS  '0 A HEA1ED STORAGE TANK.  THE




CITRATE SOLUTION LEAVES  THE TUP OF  THE DECANTER AND RETURNS TU  THE  F1HST REACTOR.



    SODIUM SULFATE OECAHYORAIE, PRODUCED BY THE NEUTRALIZATION  UF  CAUSTIC WITH A SMALL  AMOUNT OF




GENERATED SULFUHIC ACID, IS REMOVED FROM CITKATE SOLUTION  BY VACUUM CRYSTALLIZATION.




    GENERATION OF H2S GAS  IS ACCUMPLIShtU USINb RECOVERED  ELEMENTAL SULFUR, A GASEOUS REDUCTANT



(METHANE)  AND TUHblNE EXTRACTION STEAM AS CUNSUMPTIVt FEED STOCKS  IN A FIXED-BED CATALYTIC REACTOR.




    REFER TO FIGUKE J«-3«  IN SECTION 14 FOR A DETAILED  PROCESS  FLOW DIAGRAM OF THIS SYSTEM.








                                        OPERATING HISTOKY
                                               136

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION 10 (CONTINUED)



            DESIGN INFORMATION FOR UNDER CONSTRUCTION F6D SYSTEMS UN INDUSTRIAL BOILERS



ST. JOE ZINC CO.? MONACA. PENNSYLVANIA (CONTINUED)





3RD OUARTER-1978    ALL MAJOR EQUIPMENT HAS BEEN INSTALLED; INSTALLATION OF PIPING AND WIRING IS IN



PROGRESS.







4TH OUARTER-1976    THE PLANT REPORTED THAT INSTALLATION OF PIPING AND MIKING IS STILL IN PROGRESS.



START-UP HAS BEEN RESCHEDULED FOR MARCH 1979.







1ST OUARTER-1979    INSTALLATION OF PIPING AND WIRING IS 65X COMPLETE.  SEVERE HEATHER CONDITIONS



HAVE DELAYED THE START-UP OPERATIONS TO THE END OF APRIL 1979.
                                               137

-------
                                                                               STATUS  TO  APKIL   1 FT DIA X £0 FT HtltMTJ WILL  TKEAI  
-------
                                                                             STATUS TO APRIL  1979




                                      SECTION 10 (CONTINUED)




            DESIGN INFORMATION FOR UNDER CONSTRUCTION FGD SYSTEMS UN INDUSTRIAL BOILERS




STRATHMORE PAPEK COMPANY> wORONOCOi MASSACHUSETTS (CONTINUED)






FABRIC FILTER MILL HAVE A COAL 1AR EPOXY LINING.




    THE DRY WASTE GENERATED FROM THE SYSTEM WILL BE TRUCKED TO A DUMPING AREA.








                                         OPERATING HISTORY




1ST QUARTER 1979    CONSTRUCTION HAS BEGUN FOR THE DRY SCRUBBING SYSTEM* SLATED FOR STARTUP



IN MAY 1979.
                                               139

-------
                                                                             STATUS  TO APRIL   1979



                                      SECTION  10  (CONTINUED)



            DESIGN  INFORMATION FOR UNDER CONSTRUCTION F60 SYSTEMS ON  INDUSTRIAL BOILERS
  INSTALLATION NAME



  INSTALLATION LOCATION



  80UKCE CHARACTERISTICS



  SOURCE RATING



  NUMBER OF SEPARATE FGD UNITS



  NUMBER OF BOILERS BEING CONTROLLED



  CONTROL SYSTEM VENDOR



  CONTROL PROCESS



  NEH / RETROFIT



  START-UP DATE



  CONTROL SYSTEM STATUS



  802 REMOVAL EFFICIENCY



  HATER MAKE-UP



  SLUDGE OR BY-PRODUCT DISPOSAL







  CONTROL SYSTEM COS1
                      SUN PRODUCTION COMPANY




                      FELLOWS, CALIFORNIA




                      OIL (1.4X SULFUR)



                      6>000 SCFM  112,000 ACFM a) 570 F)




                       1



                       1




                      C-E NA1CO




                      SODIUM HYDROXIDE SCRUBBING



                      RETROFIT




                      MAY, 1979



                      CONSTRUCTION




                      BbX 1600 PPM at INLET)




                      4 GPW



                      HOLDING POND FUR EVAPORATION




                      1 GPM BLEEDUFF 10 DISPOSAL POND




                      SEE SECTION 13 FUR DETAILED ECONOMIC INFORMATION
                                       bACKGROUND INFORMATION



    SUN PRODUCTION COMPANY HAS AN ENHANCED OIL RECOVERY SITE NtAR FELLOWS* CALIFORNIA.  SEVERAL




STEAM GENERATORS ARE USED TO PRODUCE TMt PROCESS STEAM REQUIRED FOR  THE OPERATION.  A PART OF OIL,



NH1CH HAS A 1.4 PERCENT SULFUR, IS USED AS FUEL.




    C-E NATCO HAS BEEN AWARDED A CONTRACT TO INSTALL AN FGl> SYSTEM ON ONE 25 MM BTU/HOUR STEAM GENE-




RATOR.  NO FGO SYSTEM TREATS 12,000 ACFM FLUE GAS AT bTO F.  THE FLUt GAS IS CONTACTED WITH ONE SET



OF SPRAYS (ISO GPM) IN THE BOT1UM UF THE ABSORBER CO.5' DIAMtTtrt X 3b Fl HIGH).  PH OF b.b IS MAIN-




TAINED IN THE FIRST STAGE.  THE bAS *HICH PASSES UP A TRAY WITH A CEMRAL OOwNCOMER, IS FURTHER



CONTACTED WITH A SECOND SET OF SPKAYS (150 GPM).  A CHEVRON MIST ELIMINATOR (INCOLOY 825) LEADS INTO



A STUB STACK.  THE EXCESS LlttUOK FKOM THE TRAY OVERFLOWS 10 Tht FIRSJ STAGE.  PH IS MAINTAINED AT




7.b IN THE SECOND STAGE.  MAKEUP SODIUM HYDROXIDE SULU1ION (O.Ob GPM) IS ADDED TO THE SECOND STAGE



BY A POSITIVE DISPLACEMENT PUMP WHILE FRESH MAKEUP WATER (4 GPM) IS  ADDED TO THE FIKST STAGE.  A




BLEEOOFF (1 GPM) STREAM IS TAKEN TO WASTE DISPOSAL FROM THE FIRM SIAGE MEC1RCOLATION LINE.




    THE ABSORBER, RECIRCULAT10N PUMPS AND PIPING, AND THE SPRAY HEADERS ARE ilbL SS.  THE CAUSTIC



FEED PUMP AND THE PIPING AND 1 HE INLE1  OUCTWORK IS C.S.




    REFER TO FIGURE 14-JS IN SECTION 14 FUR A DETAILED PROCESS FLOW  DIAGRAM OF THIS SYSTEM.
4TH aUARTER-197»
                     OPERATING HISTORY



THE SYSTEM WAS UNDER CONSTRUCTION.  THE STARTUP WAS EXPECTED BY APRIL 1979.
                                               140

-------
                                                                             STATUS TO APRIL  1974



                                      SECTION 10 (CONTINUED)



            DESISN INFORMATION FOR UNDER CONSTRUCTION FGO SYSTEMS ON INDUSTRIAL BOILERS



SUN PRODUCTION COMPANY; FELLOWS, CALIFORNIA (CONTINUED)










1ST OUARTER-1979    THE SYSTEM IS SCHEDULED FOR START-UP ON MAY 1ST, PENDING PERMIT APPROVAL*  THIS



REPRESENTS A ONE-MONTH DELAY WITH RESPECT TO THE INITIAL TIMETABLE.  THE DECISION TO DELAY HAS MADE



BECAUSE IT IS PREFERABLE TO BE INVOLVED WITH ONLY ONE START-UP AT ANY GIVEN TIME.  THE C-E NATCO



UNIT AT THE SUN OILDALE SITE WILL START-UP FIRST.  AT FELLOWS, THE EQUIPMENT IS FABRICATED AND



ON-SITE, BUT IS NOT YET INSTALLED.  CONSTRUCTION IS ESTIMATED TO BE 6SX COMPLETE.  NO MAJOR



CONSTRUCTION PROBLEMS HAVE BEEN ENCOUNTERED TO DATE.



    ALTHOUGH THIS IS A FULL-SCALE UNIT, IT WILL ALSO SERVE AS A TEST UNIT FUR POSSIBLE FUTURE FGD



OPERATIONS WHICH ARE EXPECTED TO START-UP IN I960, WHICH HAVE NOT YET BEEN EVALUATED.
                                                Kit

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION 10 (CONTINUED)
            DESIGN INFORMATION FOR UNDER CONSTRUCTION FGO SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING
  NUMBER OF SEPARATE FGO UNITS
  NUM6ER OF BGILEhS BEING CONTROLLED
  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEN / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  302 REMOVAL EFFICIENCY
  MATER MAKE-UP
  SLUDGE OR BY-PRODUCT DISPOSAL


  CONTROL SYSTEM COST
SUN PRODUCTION COMPANY
01LOALE, CALIFORNIA
OIL (1.2X SULFUR)
6,000 SCFM (12,000 ACFM o) 570 F)
 Z
 I
C-E NATCO
SODIUM HYDROXIDE SCRUBBING
RETROFIT
APRIL, 1979
CONSTRUCTION
«5X (700 PPM » INLET)
4 GPM
HOLDING POND FOR EVAPORATION
1 GPM 6LEEDOFF TO DISPOSAL POND
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
    SUN PRODUCTION CO. HAS AN ENHANCED OIL RECOVERY SITE NEAR OILOALE, CALIFORNIA.  SEVERAL SMALL
GENERATORS ARE USED TO PRODUCE THE PROCESS STEAM REQUIRED FOR THE OPERATION.  A PART OF THE OIL,
WHICH HAS 1.2 PERCENT SULFUR, IS USED AS FUEL.
    C-t NATCO HAS BEEN AWARDED A CONTRACT TO INSTALL AN FGD SYSTEM ON ONE 2b MM BTU/HOUR STEAM GEN-
ERATOR.  NO FGD SYSTEM TREATS 12,000 ACFM FLUE GAS AT 570 F.  THE FLUE GAS IS CONTACTED WITH ONE
SET UF SPRAYS (150 BPM) IN THE BOTTOM OF THE ABSORBER (4.5 FT DIAMETER X 35 FT HIGH).  PH OF 6.5 IS
MAINTAINED IN THE FIRST STAGE.  THE GAS, WHICH PASSES UP A TRAY WITH A CENTRAL OOMNCOMER, IS FURTHER
CONTACTED WITH A SECOND SET OF SPRAYS (150 GPM).  THE GAS PASSES UP A CHEVRON MIST ELIMINATOR
(INCOLOY 825) INTO A STUB STACK.  THE EXCESS LIUUOR FROM THE TRAY OVERFLOWS TO THE FIRST STAGE.
A PH OF 7.5 IS MAINTAINED IN THE SECOND STAGE.  MAKEUP SODIUM HYDROXIDE SOLUTION (0.05 GPM) IS ADDED
TO THE SECOND STAGE BY A POSITIVE DISPLACEMENT PUMP WHILE FRESH MAKEUP HATER (4 GPM) IS ADDED TO THE
FIRST STAGE.  A BLEED OFF (1 GPM) STREAM IS TAKEN TO WASTE DISPOSAL FROM THE FIRST STAGE
RECIRCULAUON LINE.
    THE AbSORBER, RECIRCULATION PUMPS AND PIPING, AND SPRAY HEADERS ARE 316L S3.  THE CAUSTIC FEED
PUMP AND THE PIPING AND THE INLET DUCTWORK ARE C.S CARBON STEEL.
    REFER TO FIGURE 14-35 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.

                                        OPERATING HISTORY
                                               142

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION 10 (CONTINUED)



            DESIGN INFORMATION FOR UNDER CONSTRUCTION F6D SYSTEMS ON INDUSTRIAL BOILERS



SUN PRODUCTION COMPANY) OILDALEr CALIFORNIA (CONTINUED}





1ST OUARTER-1979    THE SYSTEM IS STILL SCHEDULED FOR START-UP APRIL 1ST, PENDING PERMIT APPROVAL.



THE EQUIPMENT IS FABRICATED AND UN-SITE* BUT IS NOT YET INSTALLED.  CONSTRUCTION IS ESTIMATED TO BE



bSX COMPLETE.  NO MAJOR CONSTRUCTION PROBLEMS HAVE BEEN ENCOUNTERED TO DATE.



    ALTHOUGH THIS IS A FULL-SCALE UNIT, IT HILL ALSO SERVE AS A TEST UNIT FOR POSSIBLE FUTURE FCD



OPERATIONS WHICH ARE EXPECTED TO START-UP IN 19ftO, BUT WHICH HAVE NOT YET BEEN EVALUATED.
                                               143

-------
                                                                              STATUS TO APRIL  1479
                                       SECTION  10  (CONTINUED)
            DESIGN  INFORMATION  FOR  UNOER  CONSTRUCT IO«  FGD  SYSTEMS  UN  INDUSTRIAL BOILERS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING

  NUMBER UF SEPARATE KM UNITS
  NUMbER OF BUILEKS BtlNG CONTROLLED
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEK / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  S02 REMOVAL EFFICIENCY
  SLUDGE OR aY-PROOUCI U1SPUSAL
  CONTROL SYSTEM COST
TEXACO INCUHPURAtEU
SAN AKDU, CALIFORNIA
OIL 11.7X SULFUK)
99,000 SCFM  (TOTAL - 4 BOILERS)
2£,UOO ACFM  ,> bOU Ft FOrt EACH OF 9 BOILERS.
 3
 9
49 HK (EQUIVALENT); 4SU MILLION 8TU/HR (TOTAL - 9 BUILEKS)
(FOR THIS NEPUKl, UNLESS STATED OTHERWISE. 2UOO SCFM = 1 EQUIVALENT M*.
THIS IS bECAUSk GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
DUCbN COMPANY
SUOIUM CAKHONATE SC«UoBlNG
RETMOFII
MARCH. 1979
CONSTrtUCriON
9bt (IOUU PPM oi INLET)
SCRUBBER EFFLUtNl OISPUSEO OF IH hASTE HELLS
SEE SECTION  13 FOK OLTAILED ECONOMIC INFORMATION
                                       bACKGNUUNO  INFORMATION
    TEXACO HAS CHOSEN TO PHASE OUT THE EXISTING CEILCOTE  SCRUBBER  SYSTEMS AT SAN ARDO  OIL  FIELDS  DUE
TO L0« S02 REMOVAL AND ilSh MAINTAINENCE COST.   A MAJOR  PrtObLEM OF  7h£  PRESENT DESIGN HAS BEEN
SCRUBBER FOULING BECAUSE OF HIGH ASH CONTENT IN THE FLUE  GAS.   AS  THE  FIRST  STEP OF  THE PHASE-OUT
PR06KAH, 9 UF THE PRESENT CEILCUTE SCRUBBERS UN THE bO MM BTU/HK STEAK GENERATORS MILL bE  REPLACED
BY 3 DUCON CO. SCRUbbERS HEADEMED IN PARALLEL.  START»UP  OF  THE NEN  EbUIPCENT IS SCHEDULED FOR MARCH
1979.  THE NEXT STEP OF TH£ PHASE-OUT PROGRAM IS DEPENDENT UN  TMt  PERFORMANCE OF THE DUCON SYSTEM.
(FOR INFORMATION ON THE CEILCOTE DESIGN SEE THE TEXACO, SAN  AKDU ENTRY IN SECTION 9  OF THIS REPORT).
    EACH OUCON SCRUBBING UNIT MILL CONSIST OF A VENTUKI FUR  PAKTICULA1E  REMOVAL FOLLOWED BY A HORIZ-
ONTAL J-STAGE SPRAY ABSORBER  ( 6UU F MILL BE HANDLED BY t»Cn  SCRUbdEK.  FURIHERMORE,  EACH TRAIN CAN
TREAT SOS OF THE LOAD AND CAN BE ISOLATED FROM THE FLUE GAS  FLOW.  IT  IS  HOPED  THAT  THIS SYSTEM DE-
SUN KILL YIELD SIGNIFICANTLY HIGHER AVAILABILITIES THAN  THE DESIGN  CURRENTLY IN USE.
     THE DUCON ABSORBER MODULE IS CONSTRUCTED OF FIBERGLASS.   THE  VENTURI  IS INCONEL 625.   THE
                                               144

-------
                                                                             STATUS TO APRIL  1979




                                      SECTION 10 (CONTINUED)



            DESIGN INFORMATION FOR UNDER CONSTRUCTION FGD SYSTEMS ON INDUSTRIAL BOILERS




TEXACO INCORPORATED; SAN ARDOr CALIFORNIA (CONTINUED)






OVERALL DIMENSIONS OF THE SYSTEM AKE 12 FEET X 23 FEET X 25 FEET.  THE SPRAY NOZZLES MILL BE NYLON




Oft STAINLESS STEEL.  BOTH THE ABSORBER AND VENTURI RECYCLE PUMPS ARE MANUFACTURED dY GALLIGER.   THEY



ARE RUBBER-LINED AND SIZED 800 AND 1200 GPM RESPECTIVELY AT 40 HP.  THERE ARE 2 GARDEN CITY FANS PER




UNIT RATED AT 100 HP EACH.  DUCON HAS GUARANTEED 9bX 302 REMOVAL EFFICIENCY.



    REFER TO FIGURE 14-36 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.








                                        OPERATING HISTORY



3RD OUARTER-1978    TEXACO HAS TAKEN DELIVERY ON ONE DUCUN SYSTEM.  DELIVERY ON THE OTHER UNITS IS




EXPECTED SOON.  THE UNITS ARE SCHEDULED TO START-UP WITH A NAOH SYSTEM.  CONSIDERATION IS BEING



GIVEN TO FUTURE CONVERSION TO NA2C03.








4TH OUARTER-1976    CONSTRUCTION IS PROGRESSING AS SCHEDULED ANO THE SYSTEMS MILL BE SODIUM




CARBONATE SCRUBBING.  THE THREE FGO SYSTEMS ARE ON THE PLANT SITE.  THE SYSTEMS ARE SCHEDULED TO BE



ONSTREAM IN MARCH 1979.








1ST OUAKTER-1979    THE CONSTRUCTION WORK CONTINUED DURING THIS PERIOD.  MOST OF THE EQUIPMENT  HAS




BEEN ERECTED.  DELAYS IN DUCTWORK FABRICATION ANO LAYOUT HAVE PUSHED THE START-UP DATE To




MAY 1979.
                                               145

-------
                                                                              STATUS TO APRIL   1979
                                            SECTION  11
                  DESIGN  INFORMATION hOK PLANNED FGO SYSTEMS ON  INOUSTHIAL BOILERS

   INSIALLATION NAME                       C.A.M.(CARBIDE-AMOCO-MONSAN10)
   INSTALLATION LOCAIIUN                   HOUSTON, TEXAS
   SOUHCt CHAKACTEK1STICS                  FUEL NOT YET SELECTED
   SUUKCE RATING                           1,200,000  SCF*  13 BOILERS)
   NUKriEK OF StPAHATE Fbl)  UMTS             3
   NUMbfcH UF KUILEKS BEING CONTROLLED       3
   sconce CAPACITY                         6So MM (EQUIVALENT); i BOILER
                                          (FOK THIS  REPOK1, UNLESS  SlATfcD OTHERWISE, 2000 SCFM * I EQUIVALENT MM.
                                          THIS IS BECAUSE CAS FLOW  KATE IS THE PRIMARY FACTO**  IN MODULE SIZING.)
   CUNTHUL SYSUM VENDOR                   VENDOR NUT YET SELECTED
   CONTROL PROCESS                         DOU0LE ALKALI
   NEW / RETKOFIT                          MEM
   START-UP DATE                           1964
   CONTROL SYSTEM STATUS                   PLANNED-CONSIDERING S02 CONTROL
   302 KE*OVAL EFFICIENCY                  NOT DETERMINED
   SLUOSt UR BY-PHODUCT DISPOSAL           DISPOSAL TECHN1UUE NO) KNOWN

                                       BACKGROUND INFORMATION
    UN10* CARBIDE,  AMOCO  AND MONSANTO HAVE ENTERED IN A JOINT VENTURE  (C.A.M.) TO ERECT A COCENERA-
TION FACILITY NEAR  HOUSTON, TEXAS.  THE CAM PLANT NlLL CONSIST OF THREE BOILERS NITH TOTAL CAPACITY
OF 6100 MILLION BTU/HOUR.  THE CAM PLANT MILL BE DESIGNED 10 GENERATE s.s MILLION LAS/HOUR STEAM
(6RU8SJ OUT (if WHICH 6 MILLION LBS/HOUR Slt'AM MILL 8E PROVIDED FOR  PROCESS USE BY TfcXAS
CITY PLANTS OF THE  THKEE  COMPANIES.  AS A COGENERAIION PLANT, CAM MILL ALSO PROVIDE STEAM FOR
COMMUNITY PUBLIC SERVICE  COMPANY TO GENERATE ABOUT 100-M* OF ELECTRICITY FOR  THE AREA.  CAM
WILL ALSO SAVE ENERGY til  OPERA)ING AT A 7S« FUEL EFFICIENCY COMPARED TO THE 3SS FOR THE
CONVENTIONAL ELECTRIC UTILITY PLANTS.
    THE TYPt 01- COAL OR LIGNITE TO BE USED IS NOT FINALIZED.  HOWEVER, IT IS  CERTAIN THAT AN FCD
SYSTEM MILL BE RfcilUlHEU.  STARTUP FOR THE FACILITY IS SCHEDULED FOR 1984.

                                        OPERATING HISTORY
3RD UUAR!ER-197(t    THE SYSTEM IS STILL IN THE VERY EARLY STAGES OF DEVELOPMENT.  STEARNS-ROGERS
HAS ttt-EN CONTRACTED TO OU PRIMARY ENGINEERING AND AID IN THE CHOICE OF AN FGO SYSTEM AND VENDOR.
AS OF THIS REPORT PERIOD, COAL TYPE HAS NOT BEEN CHOSEN AND A CONTROL SYSTEM OR SYSTEM VENDOR HAS
NOT BEEN SELECTED.

4TH UUARTER-197B    THE SYSTEM IS NOH UNDERGOING DETAILED DESIGN ENGINEERING AND PLANNING AND IS
SCHEDULED FOR FINAL REV It* BY THt THREE COMPANIES.  IF APPROVED BY ALL THREE PARTNER COMPANIES*
CONSTRUCTION MILL START IN 2ND ttUAHTER 1960 WITH COMPLETION UF THE PROJECT SCHEDULED FOR 3RD QUARTER

                                               146

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION 11 (CONTINUED)




                  DESIGN INFORMATION FOR PLANNED FGO SYSTEMS ON INDUSTRIAL BOILERS



C.A.M.(CARBIOE-AMOCO-MONSANTO); HOUSTON, TEXAS (CONTINUED)






1964.  THE SELECTION OF CONTROL SYS1EM IS EXPECTED BY THE ENU OF THE NEXT QUARTER.








1ST QUARTER-1979    THE SYSTEM IS IN PLANNING STAGE AND STILL UNDER REVIEh BY THE THREE COMPANIES.



THE CONTROL PROCESS HAS BEEN SELECTED TO BE OOU8LE ALKALI.  THERE MILL BE SIX MODULES IN PARALLEL,




TREATING FLUE GAS FROM THREE BOILERS.  ONLY FOUR MODULES MILL BE REQUIRED FOR FULL LOAD OPERATION.



REGENERATION SECTION MILL HAVE 10UX REDUNDANCY.
                                               147

-------
                                                                              STATUS  10  APRIL   1979

                                      SECTION  11  (CONTINUED)

                  DESIGN  INFORMATION fUK PLANNED  FGO  SYSTEMS  UN  INDUSTRIAL  BOILERS
   INSTALLATION NAME

   INSTALLATION LOCATION

   SOURCE CHARAUIErtlSTICS

   SOURCE RAIll.U



   NUMBEH UF SEPARATE FGO UNITS

   NUMBER OF BOILERS bEING CONTROLLED

   SOURCE. CAPACITY




   CONTROL SYSTtM VfcNDUK

   CONTROL PROCESS

   NEW / RETROFIT

   START-UP UATE

   CONTROL SYSTEM STATUS

   SU2 REMOVAL EFFICIENCY

   SLUDGE OH bY-HROUUCT DISPOSAL
CARBORUNDUM ABRASIVES

BUFFALO, NEn YORK

COAL (a.ex SULFUR)

30,000 3CFM (TOTAL - i. HJILERS)

160,000 LBS/HK STEAM (TOTAL - 2 BOILERS)

 1

 2

Ib MK (EQUIVALENT)

IFOH THIS RtPUHT, UNLESS STATED OTHENMlSE* £000 SCFM * 1 EQUIVALENT MM.
THIS is aecAusE GAS fLOm HATE is THE PRIMARY FACTOR IN MODULE SIZING.)

CARBORUNDUM tNVIR. SYS. LTD.

LIME SCHUBHING

RETHOFI1

I960

PLANNEO-CONTHACf AWARDED

9bX

WASTEHATEH TREATMENT
                                       BACKGROUND INFUKMATION

    AT THE CARHOkUNDUM ABRASIVES PLANT IN BUFFALO, NEh YORK THERE ARE 4 CUAL-FIREO BOILERS BUMMING

2.2X SULFUR COAL AllH AN AVERAGE HEA) VALUE OF 13,000 BTU/LB.  IrtO OF THESE BOILERS ARE IDENTICAL

AND HAVE A TOTAL STEAM GENEHATINU CAPACITY OF 160.000 LB/HR.

    THE FLUE CASES FRUM THE TWO bOILERS WILL BE CONTROLLED BY A VENTURI SCRUBBER (« FT INLET, 13 IN

THROAT, 13 Fl HIGH) FOLLOWED BY A 6-STAGE SPRAY TOttER (6.5 FT OlA X 36 FT HIGn).  THE FliO SYSTEM HAS

DESIGNED bY CARBORUNDUM ENVIRONMENTAL SYSTEMS LTD., AM) WILL HANULE 40,000 ACFM, OR 10WX OF THE FLUE

6AS FROM BOTH BOILERS.  LlME nILL HE USED AS 1HE SCRUBBING MEDIUM AND THE DESIGN S02 REMOVAL

EFFICIENCY IS 9bl.  THE SPRAY TONER IS DESIGNED TO OPEKATt AT 125 F NITH AN L/G RATIO OF

60 GAL/1000 ACF.  THE MAXIMUM LIUU1D FLUW RATE IS 3000 GKM.  MAKE-UP NATEH MILL BE FED TO THE TOP

OF THE ABSORBER AT A KATE OF 4!> GPM, WHILE A 30 6PM BLEED STREAM MILL FLO* FROM THE RECIRCULATION

TANK DIRECTLY TO AN EXISTING TERTIARY NASTE TREATMENT FACILITY.

     REFER TU FIGURE 14-4 IN SECTION 14 FOR A DETAILED PROCESS FLOM DIAGRAM OF THIS SYSTEM.



PARTICULAR REMOVAL OPERATING HISTORY

    THE VENTURI AND ABSORBER MODULE MERE INSTALLED IN 197b.  THE VENTORI HAS PUT INTO SERVICE FOR

PARTICULATE REMOVAL AT THAT TIME USING MATER AS THE SCRUBBING MEDIUM.  THE HIGH CHLORIDE CONTENT OF

THE FLUE GAS HAS CAUSED SERIOUS CORROSION PROBLEMS.  EFFLUENT FROM THE VENTURI HAS A PH OF 2.6,

THE 31t»L SS VENTURI WILL BE REPLACED WITH A HASTELLOY-C UNIT BEFORE START-UP FOR S02 REMOVAL.  THE

ABSORBER,  ALSO OF 316L SS IS BEING USED AS A SEPARATOR AND IS ALSO BADLY CORRODED.  AN FRP UNIT WILL
                                               148

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION 11 (CONTINUED)
                  DESIGN INFORMATION FOR PLANNED FGO SYSTEMS ON INDUSTRIAL UOILERS
CARBORUNDUM ABRASIVES! BUFFALO, NEW YORK (CONTINUED)
BE INSTALLED TO REPLACE IT AND WILL INCLUDE A 3-PASS CHEVRON MIST ELIMINATOR, ALSO MADE OF FRP. AN
ACID-RESISTANT COATING MAS RECENTLY APPLIED TO THE STACK LINER. COMPLETION OF THESE MODIFICATIONS,
AND START-UP FOR 302 REMOVAL ARE SCHEDULED FOR 1980.
                                                149

-------
                                                                             STATUS TU APRIL  1979
                                      SEC I ION 11 (CONTINUED)
                  OE&lbN INFORMATION FUR PLANNED F6U SYSTEMS ON INDUSTRIAL BOILERS
  INS I ALLATIUN NAME
  INSTALLATION LUCAIION
  SOUKCE CMAkACTfcKlSTILS
  SOURCE RATlNb
  NUMBtH OF SEPARATE f&O ONITS
  NUMBtK uF BOILtKS BelMG CONlMOLLfcU
  SOUKCt CAPACITY



  CONTROL SYSTEM VENUUK

  CONTHOL PROCESS
  Nt* / RETROFIT
  STAHT-UP DATE


  CONTHOL SYSTEM STATUS
  S02 REMOVAL EFFICIENCY
  SLUUSE OR bY-PRUUUCT DISPOSAL
CATERP1LLAN TKACIUK CO.
MAPLfcTUN, ILLINOIS

COAL li.il. SULFUR)
lOSrOUU SCfM (TOTAL - 2 BOILERS)
80,000 ACFM « 3SV K. FOM EACH OF 2 fGD SYSTEMS.
500,000 Ld/HR SI£AM (TOTAL - Z BOlLERSJ
52 Hn (EOUlVALbNT)} TOTAL - i BOILERS.
IFOM THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM • 1 EQUIVALENT MX.
THIS IS BECAUSE GAS FLbn NATE IS THt PRIMARY FACTOR IN MODULE SIZIN6.)
FMC ENVIRONMENTAL EQUIPMENT

DOUBLE ALKALI (CONCENTRATED)
NEn
JANUARY, 1980
2 SYSTEMS MILL START UP IN 1979-1980 HEATINS SEASON.
PLANNEU-CONTMACT AnAKOEO

90S (2000 PPM *l INLET)
DEMATERED SLURHY TO LANOF1LL
60+X SOLIDS (CAS04) SLUDGE DIRECILY TO LANDFILL.
                                       BACKGROUND INFORMATION
     AT THE MAPLETON, ILLINOIS PLANT, CATERPILLAR TRACTOR IS INSTALLING TNO NEM BOILERS WHICH MILL
8E COMPLETED BY THE kAMLY 19BO'S.  EACH BOILER IS HA1ED AT 250,000 LB/HH STEAM AND KILL HAVE A
SEPAHATE FliU SYSTEM.  CATthPlLLAK HAS AMAADED THE CONTRACT TO FMC ENVIORNMEMAL EUUIPMENT TO PROVIDE
CONCENTRATED DUAL ALKALI FGD SYSTEMS FOR THESE. TftO BOILERS.  THE SCRUBBERS MILL SHARE SCRUBBING
LI4UO* REGENERATION ANO SLUOGt HANOLING FACILITIES.  FOR MOKE INFORMATION, REFER TO THE CATERPILLAR
HAPLELTON ENTRY IN SECTION 10 OF THIS REPORT.
                                               ISO

-------
                                                                             STATUS TO APRIL  197S
                                      SECTION 11 (CUNliNUED)

                  DESIGN INFORMATION FUR PLANrttQ FGU SYSTEMS UN INDUSTRIAL BUlLERb
  INSTALLATION NAME
  INSTALLATION LOCATIUN
  SOURCE  CHARACTERISTICS
  SOURCE  HATING


  NUMBER  UF  SEPARATE FbO UNITS
  NUMBER  OF  &OILERS Hcl.vG CONTROLLED
  SOURCE  CAPACITY


  CONTMOL SYSTEM VENOUK
  CONTROL PHOCKSS
  MEN  / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  802  REMOVAL  EFFICIENCY
  SLUDGE  UK  BY-PRODUCT  DISPOSAL
  CONTROL SYSTEM COST
CELANESfc CORPORATION

CUMBERLAND, MARYLAHU
COAL (1.0-d.O* SULFUK)

bO,700 SCFM 11 BUILEK)
67,000 ACFM <* «50 F

 1
 1
£5 Mn IEUUIVALENT)

(FOR THIS REPORT, UNLESS STATED OTHERWISE* i!0«0 SCFM • 1 EQUIVALENT MM.
THIS IS HECAUSt GAS FLOW RATE IS THE PRIMARY FACTOR IN MUOULE SIZING.}
HMtELABHATOK-KKYfc/ftUCHHELL INT

OMV LIMfc SCHUbSlNG

KETKOFII
OECEMBEH, 1979
PLANNEU-CUKIKACT AWAKOEO

AS!

DRY WASTE IS  TRUCKED  TO A DUMPING AKEA
CAPITAL COS!  IS S1.2b MILLIOM IN 1979 DOLLARS.  IT INCLUDES
PUNCHASEU CU3T UF tUUlPMtNT, 3ILOS, INTERNAL UUCfBOHK,

SLAKERS AND PUMPS.  IF OOES NUT INCLUDE OTHER DUCTNORK,
INSTALLATION, FOUNDATION, ELECTRICAL, ID FAN, ASH HANDLING

SYSTEMS AND STACK.
                                        BACKGROUND INFORMATION
    CELANESE CUWPORATION HAS AWARDED A CONTRACT TO HHEELAURA f Uh-FiJYE/ROCKNELL INTtHNAT IOIHAL TO SET
UP A PARTICIPATE  AND Su
-------
                                                                             STATUS TO APRIL  1979




                                      SECTION 11 (CONTINUED)



                  OE8I6N INFORMATION FOK PLANNED FGD SYSTEMS ON INDUSTRIAL BOILERS




CELANE3E CORPORATION; CUM8EKLANO, MARYLAND (CONTINUED)






    CONSTRUCTION OF THE CONTROL SYSTEM WILL START IN JUNE 1979 AND START-UP IS EXPECTED TO OCCUR BY




THE END OF 1979.
                                               152

-------
                                                                              STATUS  TO  APRIL   1979
                                      SECTION 11  (CONTINUED)
                  OtblbH INFORMATION FOR PLANNED  FGD SYSTEMS DM  INDUSTRIAL BOILERS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE RATING

  NUMUER OF SEPARATE FbO UNITS
  NUMHER UF &OILER8 BfcluG CONTROLLED
  SOUKCt CAPACITY


  CONTROL SYSTEM VENDUK
  CONTROL PROCESS
  Nfcw / RETROFIT
  S1AKT-UP DATE
  CONTROL SYSTEM STATUS
  502 REMOVAL EI-FILlt^CY
  SLUOGE OH BY-PWOUUC1 DISPOSAL
DUPOM, INC.
ATHtNS> btUKUIA
COAL 11.bX SULFUK)
280>000 5CFM (10TAL - 3 BOILERS;
1,dUO,000 LU/HK SlbAH (TOTAL - 3 BOILERS)
 1
 3
14U MM (EQOlVALEfcT)
IFUH THIS MbPOrtT, UNLESS STATED OTHERWISE, £000 3CFM = 1 EQUIVALENT MN.
THIS IS BECAUSE GAS FLOW KATE IS THE PRIMARY FACTOK IN MODULE SIZING.)
VENUOK NOT YET StLECTED
DOUBLE ALKALI
nEn
DECEfBtK, 198b
PLANNED-CONSIDERING so? CONTROL
90X
OEMATEHEl) SLUrtriY TO LANDFILL
                                        HACKGKUUNO  INFOHHATIDN
    DUPOMT HAS ANNOUNCED PLANS FOR A CHEMICAL PLANT NEAR  ATHENS,  GEORGIA.   THE PLANT MILL HAVE
THHEE COAL-FINED UOILERS WITH A TOTAL CAPACITY OF ONE MILLION LB/HR  OF  STEAMJ AND A TOTAL HEAT
INPUT UF AttuuT i
-------
                                                                             STATUS TO APRIL  1979
                                      SECTION 11 (CONTINUED)
                  OESIbH INFORMATION FUH PLANNED FGO SYSTEMS ON INDUSTRIAL BOILERS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE LHARACTERIST1CS
  SOURCE HATING

  NUMBER OF SEPARATE FGO ONITS
  NUMBER UF BOILERS BEING CONTROLLED
  SOURCE CAPACITY

  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP OATE
  CONTROL SYSTEM STATUS
  S02 REMOVAL EFFICIENCY
  3LUOCE OR BY-PRODUCT DISPOSAL
SHELL OIL COMPANY
BAKtRSFlELO* CALIFORNIA
OIL 11.U SULFUR)
99,000 SCFM (TOTAL - 8 BOILERS)
400 MM flTU/MH, (50 MM BTU PER HOILEHJ
 I
 a
SO MM (EUU1VALENT)
(FOR THIS HEPCKT, UNLESS STATED OTHEHNlSE> 2000 SCFM * 1 EQUIVALENT MM.
THIS IS BECAUSE bAS FLOM MATE IS THt PRIMARY FACTOR IN MODULE SIZING.)
VENOOM NOT YET SELECTED
PROCESS NOT YET SELECTED
NEft


PLANNED-CONSIDERING 502 CONlROL
90X 15/5 PPM SOi « INLET)
DISPOSAL TECHNIQUE NUT KNUwN
                                        BACKGROUND INFORMATION
    SHELL OIL IS CONSIDERING IMPLEMENTING FGD TECHNOLOGY 10 CONTROL EMISSIONS FROM 6 SMALL OIL-
FIRED 11.U SULFUR) STtAM GtNtKAToKS.  NO PrtOCtsS OR START-UP OATE HAVE AS YEI BEEN SPECIFIED.  AN
SOZ REMOVAL EFFICIENCY OF 94X MILL BE REQUIRED.
                                               154

-------
                                                                              STATUS  TU  APRIL   1979
                                      SECTION 11  ICUNTIiMUED)
                  UESlbN INFORMATION FUrt PLANNED FUO SYSTEMS UN  INDUSTRIAL bUILfcKS
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CMAHACTEKISTICS
  SOURCE RATING
  NUMBER OF StPAKAIt FGD UNITS
  NUMBER UF bUlLtRS BEING CUNlkULLED
  SOUkCt CAPACITY


  CWvTHOL SYSTEM VENOUH
  CONTKOL FHUCtSS
  Nfctv / RfcTROUT
  STAKT-UH DATE
  CONTKUL SYSFtM SUIUS
  S0£ KEMUVAL tFFlCItivCY
  SLUUGE. OK HY-PKUDUCI DISPOSAL
SHELL OIL COMPANY
TAFlt CALIFORNIA
OIL ll.lt SULFUk)
85,000 SCFM ITOTAL
 1
                       BOILERS)
IB M* lEUOIVALENT); 100 MM BTO/HR; TOTAL - £ BOILERS
(FOH THIS HEPUKT, UNLESS STATED UlHtRMSE, 2000 SCFM = 1 EQUIVALENT MM.
THIS IS BECAUSt GAS FLOW KAlE IS THE PRIMARY FACTUR IN MODULE SIZING.)
VENOOH N01 Ytl SELECTED
PKOCESS NUT YET SELECTED
NEW
PLANNED-CONSIDERING S02 CON1NUL
4«X I37b PPM SU2 ol INLET)
DISPObAL TECHNIUUE NUT KNOWN
                                        BACKGROUND ^INFORMATION
    SHELL OIL IS CONblUEMING IMPLEMENTING FUD  TECHNOLOGY  TU  CONTROL  EMISSIONS  FKOM  2  SMALL OIL-
FlhEU 11.11 SULFUR) STEAM bENERATUKS.  NO PROCESS OR  START-UP DATE HAVE  AS  YET  BEEN SPECIFIED.   AN
502 REMOVAL EFFICIENCY UF 9
-------
                                                                             STATUS TO APKIL  1979
                                      SECTION 11 (CONTINUED)
                  OESIG'M INFORMATION FUR PLANNtO FliU SYSTEMS ON 1NUUSTRIAL BOILERS
  INSTALLATION NAME
  INSTALLATION LOCATION
  BOUNCE CHARACTERISTICS
  SOURCE RATINU

  NUMBER OF SEPAHATK FGU UNITS
  NOMBER OF BOILERS HE1NG CONTWULLEU
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP DATE
  CONTROL SYSTEM STATUS
  802 REMOVAL EFFICIENCY
  SLUDGE OH BY-PRODUCT DISPOSAL
                      TENNtCO OIL CO.
                      GREEN HIVERr WYOMING
                      COAL 11.5X SULFUR. MAXIMUM)
                      140,000 3CFM (TOTAL - H HUILERS)
                      'i. FGU SYSTEMS. EACH TREATING 120,000 ACFM a) ISO F.
                       2
                       i
                      7U Min IEQUIVALENI) ; 640 MM dTU/HR (TOTAL - 2 BOlLtRS).
                      (FOR THIS REPORT. UNLESS STATED OTHERWISE. 20UU 3CFM = I EQUIVALENT MW.
                      THIS IS BECAUSE GAS FLOW HAlE IS THE PRIMARY FACTOR IN MODULE SIZING.)
                      VENDOR NOT YET SELECTEO
                      SODIUM CARBONAU SCHUUUINU
                      NEW
                      JANUARY. 1902
                      PLANwEU-RE'QUeSUNG/EVALUA TING BIDS
                      90X 10.2 L8/MM BTU a) OUTLET)
                      HOLDING PUND FOR EVAPORATION
                                       bACKGHOUNO INFORMATION
     TENNECU OIL COMPANY HAS ANNOUNCED PLANS FOR A SDOA ASH PLAN! IN GREEN KIVER, WYOMING.
THE DESIGN AND CONSTRUCTION COMPANY WILL BE BROWN AND HOOT. INC.  THE PLANT MILL HAVE TWO JOOrOOO
cB'HR BOILERS. WHICH WILL BURN '  r.-SULFUH WYOMING COAL (1.5X SULFUR. MAXIMUM, 1U.OUU HTU/LB,
141 MOISTURE* b* »un;.
     THE FLUE GASES FROM EACH BOILER 1120,000 ACFM al 45U F) HILL BE TREATED BY AN FttD SYSTEM USING
SODIUM CARBONATE SCRUBBING.  THE SYSTEMS WILL BE  UILT NEW ANU GO ONSTREAM IN EARLY-19B2 AT THE
SAME TIME AS THE SUUA ASH PLANT.
1ST QUARTER-1979
QUARTER.
                    OPERATING HISTORY
BIOS ARE CURRENTLY BEING EVALUATED.  A VENDOR IS EXPECTED TO BE SELECTED NEXT
                                               156

-------
                                                                              STATUS  10  APHIL   19T9
                                       SECTION 11 (CONTINUED)
                   DESIGN I^FURMAMUN FUH PLANNtl) f GO SYSTEMS OH liVIJOSTRIAL dUlLERS
   INSTALLATION  NAME
   INSTALLATION  LutAllUN
   SOURCE  CHARACTERISTICS
   SOURCE.  HATING

   NUMBER  OF SEPARATE  FliU  UNI TS
   NUHrtER  OF BOILERS BtlNti CONTROLLED
   SOURCE  CAPACITY
•VtSTtKN CURKtCriONAL IU3T.
  CUNTHUL SYSTEM  VENDOR
  CONTROL PROCESS

  NE* / RETROFIT
  START-UP UATt
  CONTROL SYSTEM  STATUS
  SOi! REMOVAL  EI-FICItlXtY

  SLUOGt UW BY-PkUDUCT
CUAL U.5X
1U.OOO SCFt4 (1UUL - 1
£0,000 ACFM a) 600F
 1
30,000 Lb/HK STfcAM
b Mvi ItUUIVALENT) , io MM BTU/HH
IFUK THIS WtPUKT, UNLtSS 3TA7td OTHtRMSE,  2UUU  SCFM  a  1  EQUIVALENT Nn.
THIS IS HECAU36 liAS FLUA HATE IS iMt PHlMAKf  FACIUR  IK  MODULE SIZING.)
pnrt>HUKbn ENV.&EiMGY. SYSTEMS
SULF-K
HdMUVAL
KETROFIT
JANUAKY,
PLANNtU-CUIvTHACT ANAKUtD
till 12UUO PPM dl INLET)
bUX MOX KtMUVAL (2UU PPH « INLfclJ
          E - ELEMfcMTAL SULFUK PHUDUCT
                                        bACK(ikUUNU INFUHMATIUN
     THE HESTtRN CUKhtCTJONAL  1MST1TUIZUN IN P1T1SBUNGM,  PA. HAS T*fO IDENTICAL COAL-FIKEO BOILERS*
EACH HAUU AT 3U|UUU LB/nH  SltftM.   UNt  BOIL EH IS ALrtAYS UK 9UHU»tiY AhD THE OPEKAlING 60IUEH BUKN3
HISH aULFUH  (3.SS »J PENNSYLVANIA  bHUM I NOUS COAL.
     THt FGO SYSTtM, USINU  SULF-X  CONCUHHfcNT UXIUES kEMUVAL CSCUftE) PHUCE8S, MILL BE HETHOFITTEU bf
PITTSdUWGM ENVIMONMEM1AL  AND ENkHbY SYSTEHS, INC.  THt PROCESS HAS DEMONS!KATtO 802 AND NCK HEHOVAL
CAPAblLITIES UN A I-MW aOlLER  AT  THE  U.S. AHMY  PUAEM PLANT AT FOKT BENJAMIN, HAftKISUNf PA.  THIS
PROCESS USES 1HUN SULF1UE  (FES)  SLUkRY  AS AN ABSOHBENT ViHlCH HfcftCTS WITH SU
-------
                                                                             STATUS TO APRIL  1979




                                      SECTION 11 (CONTINUED)




                  DESIGN INFORMATION FOR PLANNED FGD SYSTEMS ON INDUSTRIAL BOILERS



WESTERN CORRECTIONAL INST.f PITTSBURGH* PENNSYLVANIA (CONTINUED)






AND THE NO.  THE OFF-GAS FROM THE KtOUCTING KILN IS PASSED THRUU6H A CtCLUNt TO REMOVE



SOME OF THE PARTICULATES AND THEN IS COOLED TO CONDENSE APPROXIMATELY 60X OF THE SULFUR




AS A LIQUID BYPRODUCT.  THE REGENERATED FES IS TAKEN TO A RESLURRYING TANK WHERE



THE FILTRATE FROM THE VACUUM FILTER, THICKENER OVERFLOW AND MAKEUP FES SLURRY ARE ADDED.  THE FCS




SLURRY FROM THE RESLURRYING TANK IS TRANSPORTED TO THE ABSORBER.



    THE FLUE GAS (20,000 ACFM d 600 F)  NlLL CONTAIN 2000 PPM S02 AND 200 PPM NO WHICH MILL BE



REDUCED TO LEVELS OF 200 PPM AND 60 PPM RESPECTIVELY.  THE ABSORBER (5 FT DIA X 30 FT HEIGHT) HILL




HAVE FOUR KOCH ENGINEERING FLEXITRAYS AND A FLEXIMESH MIST ELIMINATOR.  THERE MILL BE TWO FANS IN



THE F60 SYSTEM ONt FAN UPSTREAM OF THE SPRAY TOMER AND THE OTHER DOWNSTREAM OF THE ABSORBER.  THE




ABSORBER AND MIST ELIMINATOR WILL BE CONSTRUCTED OF 316L SS WHILE THE REGENERATION SECTION MILL BE




PRIMARILY CARBON STEEL.






                                         OPERATING HISTORY



4TH OUARTER-1976     THE SYSTEM IS IN THE DESIGN PHASE.  THE ABSORBER SECTION ONLY OF THE FGD SYSTEM



WILL BE STARTED UP IN MAY 1979 AND TESTED FOR A SHORT DURATION.  THE REGENERATION LOOP WILL BE




COMPLETED BY LATE FALL OF 1979.








1ST OUARTER-1979    THE DESIGN OF ABSORPTION SECTION IS COMPLETE.  DESIGN OF REGENERATION SECTION




WILL BE OVER BY MID-MAY 1979.  PRELIMINARY TESTING FOR ABSORPTION SECTION MILL BE PERFORMED IN



SEPTEMBER 1979.  THE STARTUP IS NOW SCHEDULED FOR JANUARY I960.
                                               ise

-------
                                                                             MAT US TU APRIL  1979

                                            SECTION 12

                     UESCR1PIION UF INDUSTRIAL UOlLEh F60 SYSItMS NOT OPERATING
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE MATING



  NUMBER UF SEPARATE FliO UNITS

  NUMBER UF BOILERS bEING CONTROLLED

  SUUKCe CAPACITY
  CONTROL SYSTEM VENOOK

  CONTROL PROCESS

  NEw / RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  302 REMOVAL EFFICIENCY

  SLUDGE OK BY-PRODUCT DISPOSAL

  CONTROL SYSTEM CUS1
nUNlit. INC.

CAlRUf ILLINOIS

CUAL (31 SULFUK)

44,000 SCFM (TOTAL • 2 BOILERS)

81,400 ACFM a> S£0 F

 1

 e

ii Mn IEQUIVALENT); TOTAL • 2 BOILERS

160,OOU LbS/HK STEAM ITUTAL)

(FOM THIS RE HURT, UNLESS STATED OTHERWISE, 2U(/0 SCFM - 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLUW kATE IS THE HRIMAWY FACTOR IN MODULE SIZING.)

DttAVU CUNP./NAT'L LIht ASS'N

LlMt SCKUBBING

RETROFIT

SEPTEMBER, 1977

INDEFINITELY SHUT uuniM

941 (2700 PPM INLET)

DEwATEKED SLURRY TU LANUFILL

SEE SECTION 13 FUR DElAILED ECONOMIC INFORMATION
                                       BACKGROUND  INFORMATION

    BUNGE PURCHASED THIS LIME SCRUBBING SYSTEM FOR TESTING PURPOSES.   THE LEWIS SCRUBBER, WHICH IS

A HORIZONTAL ROTARY VESSEL MlTH INTERNAL CHAINS. PERFORMED VERY MELL DURING THE TESr  C94 PERCENT S02

REMOVAL).  PRESENTLY, BUNGE IS USING LOW SULFUR COAL  (0.9 PERCENT) AND HAS NO PLANS TO RESTART

F60 OPERATIONS.
                                               159

-------
                                                                             STATUS TO APRIL  1979

                                      SECTION 12  (CONTINUED)

                     UtSCKIHTlUN UF INDUSTRIAL dOILER FGO SYSTtMS NOT OPERATING
  INSTALLATION NAME

  INSTALLATION LOCAlluN

  SOURCE CHARACTERISTICS

  SOUHCt RATING

  NUMbEH OF SEPARUTt FGU UNITS

  NUMOEK Of bUILEKS BEING CUNTKOLLED

  SOUHCt CAPACITY





  CONTROL SYSTEM VENDOR

  CONTHUL PROCESS

  N£» / rttlrtOFIT

  STAKT-UP UATE

  CONTROL SYSTEM STATUS

  808 REMOVAL tFFlCIENCY

  PARTICULAR REMOVAL EFFICIENCY

  SLUU6E OK BY-PRUUUCT DISPOSAL

  CONTROL SYSTEM COST
                      HAHM1S MINING CO.

                      SPMUCE PINE, NOKTH CAROLINA

                      CUAL  (0.6* SULFUR)

                      4,000 SCFM (TOTAL - 2 BOILERS)

                       Z

                       z

                      i MM  (EQUIVALENT); TUTAL - 2 BOILERS

                      (FOR  THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM B 1 EQUIVALENT MM.
                      THIS  IS BECAUSE GAS FLOM KATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

                      W.W.  SLY MANUFACTURING CO.

                      HATER SCRUBBING (NA,NH3 OPTN.)

                      RETROFIT

                      1973

                      INDEFINITELY SHUT
                      96X

                      DISPOSAL TECHNIQUE NOT KNOHN

                      SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACK6KOUND INFORMATION

    THE FGD SYSTEM AT THE HARRIS MINING COMPANY LOCATED AT SPRUCE PINE, NORTH CAROLINA REMOVES FLY»

ASH AND SULFUR DIOXIDE FROM THE FLUE GAS OF A COAL FIMED BOILEK.  THE SCRUBBER IS A M.N. SLY

1MPINGENT TYPE SCRUBbEh CONSTRUCTED OF 304 STAINLESS STEEL.  THE BOILElTlS RATED 1.9 MM

(EQUIVALENT £00 bOILER HO«SEPO«tK).  COAL COMPOSITION IS TYPICALLY 0.6X SULFUR AND S* ASH.  PRIMARY

INTEREST IN FLUE GAS SCRUBBING IS IN FLYASH REMOVAL AND NO TESTS FOR SULFUR DIOXIDE REMOVAL EFFI-

CIENCY HAVE BEEN MAUE.
ZND QUARTEH-1977
                     OPERATING HISTORY

NO OPERATIONAL PROBLEMS HAVE BEEN REPORTED.
1ST QUARTEK-lV7t>    THIS PLANT HAS BEEN MOVED TU THE INACTIVE SYSTEMS FILE UNTIL SUCH TIME AS ACTUAL

FGD OPERATIONS BEGIN.  fME SCRUBBER IS EQUIPPED NITH ALKALI ADDITION CAPABILITY, BUT NITH

THE LOM SULFUR COAL CURRENTLY BEING FIrtEO, NO ALKALI ADDITION OR PH CONTROL IS OCCURRING.
2ND QUARTER-197B

3MO.QUARTEK-197B
PLANT REPORTED NO CHANGE.

PLANT REPORTED NO CHANGE.
                                               160

-------
                                                                             STATUS TO APRIL  1979

                                      SECTION 12 (CONTINUED)

                     DESCRIPTION OF INDUSTRIAL BOILER FGU SYSTEMS NOT OPERATING
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHARACTERISTICS

  SOURCE MATING



  NUMBER OF  SEPARATE f-GO UNITS

  NUMBER OF  BOILERS rttING CONTROLLED

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOR

  CONTROL PROCESS

  NEW /  RETROFIT

  START-UP DATE

  CONTROL SYSTEM STATUS

  SOe REMOVAL EFFICIENCY

  PARTICULATE REMOVAL EFFICIENCY

  SLUDGE OR  BY-PRODUCT DISPOSAL



  CONTROL SYSTEM COST
NORTHERN OHIO SUGAR COMPANY

FINDLAY, OHIO

CUAL (1.2* SULFUR, AVERAGE)

65.830 SCFM (TOTAL - 2 BOILERS)

100,000 LB5/HK STEAM (TOTAL - Z BOILERS)

 2

 2

33 MN (EUUIVALENT), TOTAL - 2 BOILERS

(FOR THIS REPORT, UNLESS STATED OTHERhlSE, 2000 SCFM s 1 EUUIVALENT MM.
THIS IS BECAUSE GAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SUING.)

GREAT WESTERN SUGAR

SODIUM CARBONATE SCRUBBING

RETROFIT

OCTOBER, 1970

TERMINATED

76* (600 PPM oi INLET)

90Z

WASTtMATER TREATMENT AND DISCHARGE TO CITY SEDER

BLEED-OFF STREAM TO HOLDING TANK

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

    THE  NORTHERN OHIO SUSAR'tOMPANTnuS TERMINATED ALL SUGW PRODUCTION OPERATIONS AT FINOLAY OHIO.

THE PLANT  IS NOW OPEN ONLY AS A SHIPPING AND RECEIVING STATION.  THE SCRUBBER OPERATED DURING THE

1975,  1976,  AND 1977  SUGAR PRODUCTION SEASONS BEFORE THE SHUTDOWN OCCURRED.

    REFER  TO FIGORE  14-20 IN SECTION 14 FOR A DETAILED PROCESS FLOW DIAGRAM OF THIS SYSTEM.
                                               161

-------
                                                                             STATUS TO APRIL  1979
                                      SECTION It (CONTINUED)
                     DESCRIPTION OF INDUSTRIAL dUILEK FGO SYSTEMS NOT OPERATING
  INSTALLATION NAME
  INSTALLATION LOCATION
  SOURCE CHARACTERISTICS
  SOURCE HATING
  NUMBER OF SEPAKA1E FUU UNITS
  NUMBER OF BOILERS BEING CONIKOLLEO
  SOURCE CAPACITY


  CONTROL SYSTEM VENDOR
  CONTROL PROCESS
  NEW / RETROFIT
  START-UP UATE
  CONTROL SYSTEM STATUS
  802 REMOVAL EFFICIENCY
  PARTICULATE RtMUVAL EFFICIENCY
  SLUUbE UR BY-PRUOUCT DISPOSAL
  CONTROL SYSTEM COST
SHELLER GLOBE CURP.
NORFOLK, VIRGINIA
COAL (< l.OX SULFUR)
8,000 SCFM (TOTAL - 1 BOILER)
 1
 1
4 MN (EQUIVALENT)! TUTAL - 1 BOILER
(FOR THIS REPORT, UNLESS STATED OTHERWISE, 2000 SCFM * I EQUIVALENT MN.
THIS IS BECAUSE liAS FLOW RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)
W.W. SLY MANUFACTURING CO.
SUDIUM HYDROXIDE SCRUBBING
RETROFIT
INDEFINITELY SHUT DOWN
NUT OETERHINEU
NOT DETERMINED
OVERFLOW TO SEwEH/SLUOGE TO LANDFILL
SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION
     IN NORFOLK, VIRGINIA, SHELLER GLOBE CORPORATION OPERATES THE MITCHELL SMITH DIVISION PLANT,
HHENE THE PRIMARY PRODUCT IS CORK RUBBER GASKET MATERIAL.  PROCESS (AUTOCLAVE) AND HEATING STEAM
ARE SUPPLIED BY A BOILER RATED AT 350 BOILER HP (ABOUT 3.5 Mrt EQUIVALENT).  STEAM CONDITIONS ARE
US PSI AT 32i F.  THE 6U1LEK MAS ORIGINALLY ERECTED IN 1939, BUT UNOEftftENT A COMPLETE OVERHAUL IN
1977.  BOILER TUBES, REFRACTORY BRICK, GRATE, AND SOOT BLOrtERS «ERE REPLACED DURING THE OVERHAUL.
THE BOILER FIRES COAL SUPPLIED BY GENERAL COAL - NOMINAL SIZE IS 1.25 X 0.25 INCHES.  COAL
CHARACTERISTICS ARE AS FULLOKSJ  HHV«i3,«oo BTU/LB, ASH«b», AND SULFUR is LESS THAN u.
    THE EMISSIONS CONTROL SYSTEM AT SHELLER GLOBE CONSISTS OF A w.w. SLY SINGLE-STAGE IMPINJET
SCRUBBER (*170) WHICH REMOVES PARTICULATE AND 802 FROM THE FLOt GAS.  THE SYSTEM USES A NAOH MAKE-UP
PRIMARILY FOR CORROSION CONTROL BUT 302 CONTROL IS AN ADDITIONAL BENEFIT.  RECYCLE TANK SUPERNATANT
IS PH NEUTRALIZED AND IS DISCHARGED TO CITY 8EMEHS WHILE FLY ASH AND SEDIMENT ARE SETTLED, SCRAPED
OUT AND HAULED TO A SANITARY LANDFILL.
    THE SCRUBBER MODULE IS CONSTRUCTED OF 316L S3 (10 FT OIA X 15 FT HIGH).  THE FLOE GAS RATE ENTE-
RING THE SCRUBBER IS 19,400 CFM » 450 F.  THE DUCTING ENTERING AND EXITING THE SCRUBBER IS MADE OF
3/8' C.S. AND COHTEN STEEL RESPECTIVELY.  THE tt.M. SLY FAN 4BOILER ID)  IS MADE OF CARBON STEEL.
THE RECYCLE TANK IS CONSTRUCTED OF UNLINEO STEEL (20 FT X 10 FT X 8 FT) AND THE PIPING IS OF PVC.
CHEMICALS ARE PURCHASED FROM THE CHEMICAL TREATMENT CO. WHO ALSO OPERATE THE SCRUBBING SYSTEM.
    REFER TO FIGURE 14-33 IN SECTION 14 FOR A DETAILED PROCESS FLON DIAGRAM OF THIS SYSTEM.
                                               162

-------
                                                                             STATUS TO APRIL  1979



                                      SECTION 12 (CONTINUED)



                     DESCRIPTION OF INDUSTRIAL BOILER FGO SYSTEMS NOT OPERATING



SHELLED ULU6E CORP.; NORFOLK, VIRGINIA (CONTINUED)










                                        OPERATING HISTORY



    UPON INITIAL STARTUP NO CAUSTIC WAS INTRODUCED TO THE SYSTEM AND MITHIN A FEN MONTHS THE INTER-



NALS OF Trie MODULI: AND THE STEEL PIPING SYSTEM HERE CORRODED BEYOND USE.  THIS NECESSITATED REPLACE-



MENT OF Tht INTERNALS, SUBSTITUTION OF STEEL PIPE HITH PVCr AND ADDITION OF NAOH TO THE SCRUBBING



LIQUOR.







2ND QUANTER-1978    DURING THE REPORT PERIOD THE UNIT UNDERWENT A VIRGINIA EPA CERTIFICATION



INSPECTION, AND WAS FOUND TO BE IN COMPLIANCE.  NO SCRUBBER-RELATED PROBLEMS HAVE OCCURRED.







3RD QUAHTEH-1970    BOILER OPERATION WAS ESTIMATED TO BE AT 601 CAPACITY 24 HR8 PER DAY, t DAYS PER



MEEK.  NO SCRUBBER-RELATED PROBLEMS HAVE BEEN REPORTED.  PLANT PERSONNEL ARE CON8IDERIN6 REPLACEMENT



OF THE PRtSENT SYSTEM DUt TO REAR ON THE EQUIPMENT.







4TH QUAKTEK-1970    MO SCRUBBER RELATED PROBLEMS HERE REPORTED DURING THIS PERIOD.  AT PRESENT, THE



USE OF FRESH NAOH HAS BEEN DISCONTINUED*
                                               163

-------
                                                                             STATUS TO APRIL  1979

                                      SECTION 12 (CONTINUED)

                     DESCRIPTION OF INDUSTRIAL BU1LEK FGU SYSTEMS NOT OPERATING
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOUKCE CHARACIEKISTICS

  30UHCE MATING

  NUMbER OF SEPARATE FGU UNITS

  NUMbER OF BOILERS bEING CON1NOLLEU

  SOURCE CAPACITY




  CONTHOL SYSTEM VENDOR

  CONTROL PROCESS

  NEW / HETHOF1T

  START-UP DATE

  CONTROL SYSTEM STATUS

  SOe REMOVAL EFFICIENCY

  HATEk MAKE-UP

  SLU06E OR BY-PRODUCT DISPOSAL



  CONTROL SYSTEM COST
THANSCO TEXTILES, INC.

AUGUSTA, GEORGIA

FUEL OIL (2X MAX. SULFUR)

50,000 ACFM

 I

 1

20 Mh lEUUIVALfcNI)

IFON THIS REPORT, UNLtSS STATED UTHtRHlSE, 2000 SCFM s 1 EQUIVALENT MM.
THIS IS BECAUSE GAS FLOn RATE IS THE PRIMARY FACTO* IN MOOULE SUING.)

FMC ENVIRONMENTAL EQUIPMENT

SODIUM CARBONATE SCRUBBING

NEW

MARCH,  197*

INDEFINITELY SHUT DOWN

BOX-65X 1610 Ld/MR ol INLET)

48 SHM; OPEN LUOP

WASTEHATER TREATMENT AND DISCHARGE TO RIVER

NAaSUJ/S04 L1UUOH UISCHAMGEO TO A HOLDING POND

SEE SECTION 13 FUN DETAILED ECONOMIC INFORMA1ION
                                       BACKGROUND INFORMATIUN

    THE FGO OPERATIONS HAVE BEEN TERMINATED FUN AN INDEFINITE PERIOD.  THt PLANT BURNS NUMBER b

FUEL OIL AND THE SULFUH DIOXIDE EMISSIONS ARC SOX OF THE EXI3ITING REGULATIONS.  THE bOlLER IS

RATED AT 20 MN (EOUIVALENT) AND PRODUCES IbO.OOO L8S/HK STEAM.  WHEN OPERATIONAL, THE SCRUBBER

SYSTEM HAD A FLUE GAS VOLUME OF bu.000 ACFM AT 140 DEGREES F.  SYSTEM START-UP OCCURRED IN MARCH

1975 AND SCRUBBER OPERATIONS MERE TERMINATED LATER IN THE SAME YEAR.  THERE ARE CURRENTLY NO PLANS

TO INITIATE OPERATIONS.
                                               164

-------
                                                                             STATUS TO APRIL  1979

                                      SECTION 14 (CONTINUED)

                     OtSCRlPIlON UP INDUSTRIAL BOILER FGD SYSTEMS NUT OPERATING
  INSTALLATION NAME

  INSTALLATION LOCATION

  SOURCE CHAKACTEKISUCS

  SOURCE HATING

  NUMBER OF SEPAKATE FGO UNITS

  NUMBER (if olIILtRS rifcING CONTkULLtD

  SOURCE CAPACITY




  CONTROL SYSTEM VENDOK

  CONTROL PROCESS

  NEW / RETROFIT

  START-UP OATE

  CONTROL SYSTEM STATUS

  SU2 REMOVAL EFFICIENCY

  PARTICOLATb HEMUVAL EFFICIENCY

  WATER MAKE-UP

  SLUDGE OR HY-PRUDUCT DISPOSAL



  CONTROL SYSTEM COST
U.S. bYPSUM CORP.

OAKMONT, PENNSYLVANIA

COAL

19,300 SCFH CTOTAL - * BOILERS)

 1

 4

10 MM (EQUIVALENT)

(FUR THIS REPORT, UNLESS STATED OTHERWISE.  £000 SCFM s 1 EQUIVALENT  MM.
THIS IS BECAUSE GAS FLU* RATE IS THE PRIMARY FACTOR IN MODULE SIZING.)

NEPTUNE AIKPOL, l*C.

DOUBLE ALKALI (DILUTE)

NtW



NEVER STARTED-UP

SUFFICIENT TO MEET REGULATION

MEETS CODE

10 (iPM (CLOSED LOOP)

DEWATEREO SLURRY TO LANDFILL

SLUDGE TO POMU FOR DRYING.  THEN TO LANDFILL.

SEE SECTION 13 FOR DETAILED ECONOMIC INFORMATION
                                       BACKGROUND INFORMATION

    AN AIRPOL DOUBLE ALKALI SCRUBBING SYSTEM IS UN-SITE, INSTALLED, AND READY FOR OPERATIONS.

HUNeVER,  OS GYPSUM DECIDED NUT TO INITIATE PRODUCTION AT THIS FACILITY FOR ECONOMIC REASONS. A

CHECK OURIN6 THE 4TH UUARTER 1970 REPORT PERIOD REVEALED THAT THERE ARE STILL NO PLANS TO USE THIS

FACILITY.
                                               IbS

-------
                                                                            STATUS TO APRIL  1979

                                           SECTION 13

                                   INDUSTRIAL BOILER FGD COSTS


                                VENDOR
COMPANY                         PROCESS                                           COST
LOCATION                        STATUS                                   ........................
CAPACITY (SCFM)                 START-UP DATE                            CAPITAL        OPERATIN6
ALYESKA PIPELINE SERVICE CO.    FMC ENVIRONMENTAL EQUIPMENT
VALOEZi ALASKA                  SODIUM HYDROXIDE SCRUBBING
50,000                          OPERATIONAL
                                 6/77

                      PLANT PERSONNEL HAVE NUT SEPARATED OUT FGD SYSTEM
                      COSTS FROM OVERALL PROJECT COSTS NOR DO THEY KEEP
                      OPERATING COSTS FOR THE F6D SYSTEM.
ARCO/POLVMERS, INC.             FMC ENVIRONMENTAL EQUIPMENT          Sll*600,000.     IZ,400,000.
MONACA, PENNSYLVANIA            DOUBLE ALKALI (CONCENTRATED)
305,000                         CONSTRUCTION
                                 6/60

                      THE CAPITAL COST REPRESENTS THE TOTAL COST OF THE
                      ENTIRE FCD SYSTEM INCLUDING INSTALLTION, DUCTWORK*
                      STACK, PIPING, ENGINEERING, START-UP, TE8TIN6,
                      INSTRUMENTATION, OVERHEADS AND HASTE DISPOSAL
                      FACILITIES IN MID-1979 DOLLARS,  THE PROJECTED
                      OPERATING COST IS IS/TON OF COAL.
BELRI06E OIL CO.                C-E NATCO                               1185*000.
MCKITTRICK, CALIFORNIA          SODIUM HYDROXIDE SCRUBBING
12,000                          OPERATIONAL
                                 1/79

                      THIS IB THE REPORTED CAPITAL COST IN 1976 DOLLARS.
BSLRIOGE OIL CO.                HEATER TECHNOLOGY                       S106,000.        S79,000.
MCKITTHICK, CALIFORNIA          SODIUM HYDROXIDE SCRUBBING
18,000                          OPERATIONAL
                                 6/76
                      THE CAPITAL COST INCLUDES THE COSTS OF SCRUBBER,
                      RECYCLE TANK, STACK, OEMISTEH, PIPING, DUCTWORK,
                      ELECTRICITY, INSTRUMENTATION IN MID-1976 DOLLARS.
                      IT DOES NOT INCLUDE CAUSTIC TANK, PUMP* FEEDLINES,
                      HASTE DISPOSAL FACILITIES AND MATED AND ELECTRICAL
                      CONNECTIONS.  THE OPERATING COST IS BASED ON 92S
                      AVAILABILITY THROUGH A YEAR.  IT INCLUDE* COST OF
                      CAUSTIC (6.6 GAL/HOUfO, ELECTRICITY, MATER AND
                      LABOR ZN LATE 1976 UOLLAKS,  IT DOES NOT INCLUDE
                      INDIRECT COSTS AND NABTfc DISPOSAL.
                                              166

-------
                                                                            STATUS TO APRIL  1979
                                     SECTION 13 (CONTINUED)

                                   INDUSTRIAL BOILER FGD COSTS
COMPANY
LOCATION
CAPACITY ISCFM)
          VENDOR
          PROCESS
          STATOS
          START-UP DATE
            COST
                                                                         CAPITAL
                                                                  OPERATING
8ELRIUGE OIL CO.
MCKITTR1CK, CALIFORNIA
ie,ooo
          THERMOTICS INC.                         $175,000.
          SODIUM HYDROXIDE SCRUBBING
          OPERATIONAL
           7/7B

THE CAPITAL COST INCLUDES THE TOTAL INSTALLED COST
OF THE ENTIRE FGD SYSTEM IN MID-1978 DOLLARS.  IT
DOES NOT INCLUDE HASTE DISPOSAL FACILITIES AND
MATER AND ELECTRICAL CONNECTIONS.  THE OPERATING
COST IS BASED ON 92X AVAILABILITY THROUGH A YEAR.
IT INCLUDES COST OF THE CAUSTIC (6.9 GAL/HOUH),
ELECTRICITY, MATER AND LABOR IN LATE ma DOLLARS.
IT DOES NOT INCLUDE INDIRECT COSTS AND HASTE
DISPOSAL.
                   $60,500.
BUNGE, INC.
CAIRO, ILLINOIS
44,000
          ORAVO COKP./NAT'L LIME ASS'N
          LIME SCRUBBING
          INDEFINITELY SHUT DOWN
           9/77
•1,000,000.
                      THE CAPITAL COST REPRESENTS THE TOTAL INSTALLED
                      COST OF THE FGD SYSTEM, ENGINEERING, START-UP, AND
                      TESTING IN 1977 DOLLARS.
CANTON TEXTILES
CANTON, GEORGIA
          FMC ENVIRONMENTAL EQUIPMENT             $138,000.
          CAUSTIC NASTE STREAM
          OPERATIONAL
           b/74

THE CAPITAL COST REPRESENTS THE TOTAL COST FOR THE
INSTALLED SYSTEM, IN 1974 DOLLARS.
                   134*000,
CATERPILLAR IRftCTOrt CO.
CAST PEONIA, ILLINOIS
210,000
          FMC ENVIRONMENTAL EQUIPMENT
          DOUBLE ALKALI (CONCENTRATED)
          OPERATIONAL
           4/76
                      NO ECONOMIC INFORMATION HAS BEEN SUPPLIED FOR THE
                      CATERPILLAR FGO SYSTEMS.
                                              167

-------
                                                                            STATUS TO APRIL  1979

                                     SECTION 13 (CONTINUED)

                                   INDUSTRIAL BOILER FGD COSTS


                                VENDOR
COMPANY                         PROCESS                                           COST
LOCATION                        STATUS	
CAPACITY (SCFM)                 START-UP DATE                            CAPITAL        OPERATING
CATERPILLAR TRACTOR CO.         ZURN INDUSTRIES
JOLIETr ILLINOIS                DOUBLE ALKALI (DILUTE)
67*000                          OPERATIONAL
                                 9/74
                      NO ECONOMIC INFORMATION HAS BEEN SUPPLIED FOR THE
                      CATERPILLAR FGD SYSTEMS.
CATERPILLAR TRACTOR CU.         FMC ENVIRONMENTAL EQUIPMENT
MAPLETON, ILLINOIS              DOUBLE ALKALI (CONCENTRATED)
131,000                         OPERATIONAL
                                 3/79

                      NO ECONOMIC INFORMATION HAS BEEN SUPPLIED FOR THE
                      CATERPILLAR FGO SYSTEMS.
CATERPILLAR TRACTOR CO.         ZURN INDUSTRIES
MORTON, ILLINOIS                DOUBLE ALKALI (DILUTE)
38,000                          OPERATIONAL
                      NO ECONOMIC INFORMATION HAS BEEN SUPPLIED FOR THE
                      CATERPILLAR FGD SYSTEMS.
CATERPILLAR TRACTOK CO.         FMC ENVIRONMENTAL EQUIPMENT
MOSSVlLLEr ILLINOIS             DOUBLE ALKALI (CONCENTRATED)
140.000                         OPEHAT1UMAL
                                10/75

                      NO ECONOMIC INFORMATION HAS BEEN SUPPLUO FOR THE
                      CATERPILLAR FGD SYSTEMS.
                                              166

-------
                                                                            STATUS TO APRIL  1979

                                     SECTION  13  (CONTINUED)

                                    INDUSTRIAL BOILER FGO COSTS


                                VENDOR
COMPANY                         PROCESS                                           COST
LOCATION                        STATUS                                   ........................
CAPACITY (SCFM)                 START-UP DATE                            CAPITAL        OPERATING
CHEVRON U.S.A. INC.             KOCH ENGINEERING                      $8,800.000.       $930,000.
BAKERSFIELD, CALIFORNIA         SODIUM CARBONATE SCRUBBING
248,000                         OPERATIONAL
                                 7/78

                      THE CAPITAL COST IS  IN  1978 DOLLARS.  THIS REPRE-
                      SENTS THE TOTAL INSTALLED COST OF THE F6D SYSTEM
                      INCLUDING SITE PREPERATION.  THE OPERATING COST
                      INCLUDES ELECTRICITY, SODA ASH, AND MAINTENANCE
                      (LABOR AND MATERIALS).  THIS CORRESPONDS TO A 340
                      DAY YEAR AND APPROXIMATELY S900/DAY PER SCRUBBER
                      IN 1978.
CHEVRON U.S.A. INC.             KOCH ENGINEERING
BAKERSFIELD, CALIFORNIA         SODIUM CARBONATE SCRUBBING
146,000                         CONSTRUCTION
                                 7/79

                      NO ECONOMIC  INFORMATION HAS BEEN SUPPLIED FOR THE
                      CHEVRON FGD  SYSTEMS.
DOUBLE BARREL OIL CO.           C-E NATCO
BAKERSFIELD, CALIFORNIA         SODIUM HYDROXIDE SCRUBBING
1Z,000                          OPERATIONAL
                                 6/76

                      NO ECONOMIC INFORMATION HAS BEEN SUPPLIED FOR THE
                      DOUBLE BARREL OIL FGD SYSTEMS.
FIRESTONE TIRE AND RUBBER CO.   FMC ENVIRONMENTAL EQUIPMENT             $163,000.        $60,000.
POTTSTOMN, PENNSYLVANIA         DOUBLE ALKALI  (CONCENTRATED)
8070                            OPERATIONAL
                                 1/75

                      THE CAPITAL COST INCLUDES EQUIPMENT, ENGINEERING
                      AND STARTUP.  THE COST DOES NOT INCLUDE LABOR AND
                      MATERIALS FOR ELECTRICAL SYSTEM, PIPING, OK STRUC-
                      TURAL AND FOUNDATIONS ERECTION IN 1974 DOLLARS.
                      THE OPERATING COST INCLUDES CHEMICALS, LABOR,
                      ELECTRICITY, DISPOSAL, MATERIALS, AMD LAB WOHK FOR
                      1977.
                                              169

-------
                                                                            STATUS TO APRIL  1979

                                     SECTION 13 (CONTINUED)

                                   INDUSTRIAL BUILEH FUO COSTS


                                VENDOR
COMPANY                         PROCESS                                           COST
LOCA1ION                        STATUS                                   ........................
CAPACITY (SCFM)                 START-UP DATE                            CAPITAL        OPERATING
FMC (SODA ASH PLANT)            FMC ENVIRONMENTAL EQUIPMENT          S10,OOU,OUO,
6REEN RIVER, WYOMING            SODIUM CARBONATE SCRUBBING
446,000                         OPERATIONAL
                                 5/76

                      THIS TOTAL CAPITAL COST. IN 197* DOLLARS,
                      INCLUDES ESP AND F&D PURCHASE AND INSTALLATION
                      COSTS.
GENERAL MOTORS CORPORATION      ENTOLETER, INC,                         $668,000.
DAYTON, OHIO                    SODIUM HYDROXIDE SCRUBBING
36,000                          OPERATIONAL
                                 9/74

                      THE CAPITAL COST IS THE TOTAL INSTALLED COST FOR
                      THE TWO FGD SYSTEMS, IN 1974 DOLLARS.
GENERAL MOTORS CORPORATION      GM ENVIRONMENTAL                      S3,200,000.       9644,000,
PARMA, OHIO                     DOUBLE ALKALI (DILUTE)
138,400                         OPERATIONAL
                                 3/74

                      THE OPERATING COST REPRESENTS S11.70/TON COAL.
GENERAL MOTORS CORPORATION      GM ENVIRONMENTAL                        5600,000,
PONTIAC, MICHIGAN               SODIUH HYDROXIDE SCRUBBING
107,300                         OPERATIONAL
                                 4/76

                      THE CAPITAL COST REPRESENTS THE TOTAL INSTALLED
                      COST IN 1972 DOLLARS.
GENERAL MOTORS CORPORATION      A.O. LITTLE                             $773,000.       1172,000,
ST. LUU1S, MISSOURI             SODIUM HYDROXIDE SCRUBBING
64,000                          OPERATIONAL
                                1972

                      THE CAPITAL COST IS IN 1973 DOLLARS.  THE OPERAT-
                      ING COST INCLUDES MAINTENANCE MATERIALS, LABOR AND
                                              170

-------
                                                                            STATUS TO APRIL  1979
                                     SECTION 13 (CONTINUED)

                                   INDUSTRIAL BOILER FGD COSTS
COMPANY
LOCATION
CAPACITY C5CFM)
VENDOR
PROCESS
STATUS
STAKT-UP DATE
          COST
CAPITAL
                OPERATING
GENERAL MOTORS CORPORATION
TONONANbAr NEW YORK
92,000
FMC ENVIRONMENTAL EQUIPMENT
SODIUM HYDROXIDE SCRUBBING
OPERATIONAL
 6/75
                      THE CAPITAL COST IS IN 1974 DOLLARS.
GEORGIA-PACIFIC PAPtR CO.
CROSSEIlr ARKANSAS
2*0,ODD
NEPTUNE AIRPUL, INC*
CAUSTIC WASTE STREAM
OPERATIONAL
 7/75
»Z75,000.
                      THE CAPITAL COST REPRESENTS THE ABSORBER COST ONLY
                      AND IS IN 1974 DOLLARS.
GETTY OIL COMPANY
BAKERSFItLU, CALIFORNIA
72,000
FMC ENVIRONMENTAL EQUIPMENT
SODIUM CARBONATE SCRUBBING
OPERATIONAL
 t/77
                                                                        $400,000,
                •390,000,
                      THE CAPITAL COST INCLUDES THE ABSORBER MODULE,
                      SODA ASH TANK, PUMPS, AND PIPING IN 1977 DOLLARS.
                      IT DUES NOT INCLUDE THE STACK, DUCTING, ENGINEER-
                      ING, OR OVERHEADS.  THE OPERATING COST 19 EQUIV-
                      ALENT TO S0.16/MM BTU, INCLUDES THE COST FOR
                      SODA ASH, ELECTRICITY, AND SCRUBBER MAINTENANCE,
                      AND REPRESENTS A SOU-DAY YEAR.
fcETTY OIL COMPANY
BAKERSFULU, CALIFORNIA
891,000
IN-HOUSE UESIGN
SODIUM CARBONATE SCRUBBING
OPERATIONAL
                                                                      15,400,000.
              •9,820,000.
                      THE CAPITAL COST  INCLUDES COST OH SCRUBBER, FAN,
                      UUCTlNb, TANKS, PUMPS, PIPINtt, ELECTRICAL, AND
                      INSTALLATION  IN 1976 DOLLARS FOR 6 SCRUBBER SYSTEM
                      THE UPbRATING COST INCLUDES ELECTRICITY, SCRUBBER
                      MAINTENANCE,  AND  SODA ASH FON 9 SYSTEMS.  IT IS
                      BASED ON A J40-DAV YEAR.
                                               171

-------
                                                                            STATUS TO APRIL  1979
                                     SECTION 13 (CONTINUED)

                                   INDUSTK1AL bOILER FGO COSTS
COMPANY
LOCATION
CAPACITY (SCFM)
VENDOR
PROCESS
STATUS
START-UP DATE
            COST
   CAPITAL
OPERATING
6ETTY OIL COMPANY
ORCUTT, CALIFORNIA
5000
IN-HOUSE DESIGN
SODIUM HYDROXIDE SCRUBBING
OPERATIONAL
 6/77
6REAT SOUTHERN PAPER CO.
CEDAR SPRINGS, GEORGIA
420,000
NEPTUNE AIRPOL, INC.
CAUSTIC MSTE STREAM
OPERATIONAL
1975
$1,800,000.
                      THE CAPITAL COST IS THE TOTAL INSTALLED COST FOR
                      THE TWO SCRUBBER MODULES IN 1974 DOLLARS.
6RISSOM AIR FORCE BASE
BUNKER HILL, INDIANA
32,000
NEPTUNE AIRHUL, INC.
DOUBLE ALKALI (CONCENTKATED)
CONSTRUCTION
11/79
11,610,000.
                      THE CAPITAL COST REPRESENTS THE TOTAL INSTALLED
                      F6D SYSTEM COST AND IS BROKEN OUWN BY CONSTRUCTION
                      DEPARTMENT AS FOLLOWS! ELECTRICAL ftORK-S195,000?
                      CIVIL "OrtK-S229,600| MECHANICAL «URK"«l,184,930.
HARRIS MINING CO.
SPRUCE PINF, NURTH CAROLINA
4,000
W.H. SLY MANUI-ACTUKIHG CU.
MATER SCRUBBING (NA,*HJ UPTN.)
INDEFINITELY SHUT DUM.N
1973
   »31,000.
                      THE CAPITAL COST IS THE TOTAL INSTALLED COST IN
                      1973 OULLAKS.
INLAND CONTAINER CORPORATION
NEW JOHNSONVILLE, IENNES3EE
154,000
NEPTUNE AIRPUL INC.
AMMONIA SCRUBBING
CONSTKUCTiON
 5/79
                      THE CAPITAL COST IS IHt HURChASED COST OF
                      VENTUKl SCRUdBEK, SEPARATOR AND SIUB STACK ONLY
                                              172

-------
                                                                            STATUS TO APRIL  1979
                                     SECTION 13  (CONTINUED)

                                   INDUSTRIAL BOILER FGO COSTS
COMPANY
LOCATION
CAPACITY (SCFM)
          VENDOR
          PROCESS
          STATUS
          START-UP DATE
                                                  COST

                                         CAPITAL        OPERATING
ITT RAYONIER, INC.
FERNANOINA BEACH, FLORIDA
176,000
          NEPTUNE AIRPOL, INC.
          SODIUM HYDROXIDE SCRUBBING
          OPERATIONAL
          1975
                                        SbOO.OOO.
                      THE CAPITAL COST IS FOR 2 SCRUBBERS, DUCTWORK,
                      AND STACKS IN 1975 DOLLARS.
KERR-MC6EE CHEMICAL CORP.
TRONA, CALIFORNIA
490,000
COMBUSTION EQUIPMENT ASSOC.
SODIUM CARBONATE SCRUBBING
OPERATIONAL
 6/76
                                                16,000,000.
                      KERR-MCGEE SPENT SI.5 MILLION IN A PILOT PLANT FOR
                      SEVERAL YEARS BEFORE AND DURING CONSTRUCTION OF
                      THE NEW FACILITY,  OUT OF THE S200 MILLION PROJECT
                      COST, S16 MILLION OF THAT IS FOR POWER PLANT AND
                      •6 MILLION IS FOR THE BOILER RELATED POLLUTION
                      CONTROL COSTS.
MEAD PAPERBOARD CO.
STEVENSON, ALABAMA
100,000
          NEPTUNE AIRPOL, INC.                    9173,000.
          SODIUM CARBONATE SCRUBBING
          OPERATIONAL
          1975

THE CAPITAL COST REPRESENTS THE ORIGINAL EQUIPMENT
AND INSTALLATION COST IN 1974.  SINCE THEN,  EXTEN-
SIVE MODIFICATIONS HAVE BEEN REQUIRED.  ANOTHER
1173,000 WAS SPENT FOR REPAIRS AND UPGRADING IN
1976.  OVER THE SCRUBBER PLANT LIFE, AN ADDITIONAL
1136,000 HAS BEEN SPENT, INCLUDING:* 35,000  (RUB-
dER LINERS), 954,000 (STAINLESS STEEL LINERS),  AND
447,000 (GENERAL REPAIRS).
THE OPERATING COST INCLUDES S40,000/YH FOR
OPERATING LABOR, »40,000/YR FOR MAINTENANCE
LABOR, AND 1760,000/YR FOR REAGENT (6526 TONS).
                                                        S640,000,
MINN-DAK FARMER'S CO-OPERATIVE
MAHPETON, NORTH DAKOTA
164,000
          KOCH ENGINEERING
          AMMONIA SCRUBBING
          OPERATIONAL
           6/77
                                                                        1300,000,
                      THE CAPITAL COST REPRESENTS THE TOTAL EQUIPMENT
                      COST IN 1977 DOLLARS.
                                              173

-------
                                                                            STATUS TO APRIL  1979

                                     SECTION 13 (CONTINUED)

                                   INDUSTRIAL BOILER FGD COSTS


                                VENDOR
COMPANY                         PKOCfcSS                                           COST
LOCATION                        STATUS                                   ........................
CAPACITY (SCFM)                 START-UP DATE                            CAPITAL        OPERATING
MOBIL OIL COMPANY               HEATER TECHNOLOGY                       1500,000.
BUTTONNILLOW, CALIFORNIA        SUOIUM CARBONATE SCRUBBING
80.500                          CONSTRUCTION
                                 «/79

                      THE CAPITAL COST INCLUDES ABSORBER MODULES, RE-
                      CYCLE TANKS, STACK, OEMISTERS, PUMPS, AND PIPING
                      IN 1976 DOLLARS.  IT DOES NOT INCLUDE CAUSTIC
                      TANK, FEED PUMPSi OR FEED PIPES.
MOBIL OIL COMPANY               IN-HOUSE DESIGN                       (2,900,000.     SI,390,000.
SAN AROO, CALIFORNIA            SODIUM HYDROXIDE SCRUBBING
17b,000                         OPERATIONAL
                                1974

                      THE CAPITAL COST REPRESENTS EQUIPMENT, INSTAL-
                      LATION, PIPING, DUCTHORK, STACK, WATER TREATMENT
                      FACILITY, AND INSTRUMENTATION IN 197* DOLLARS.
                      THE OPERATING COST INCLUDES ELECTRICITY, CAUSTIC,
                      LABOR* AND MAINTENANCE.  II DOES NOT INCLUDE IN-
                      DIRECT (FIXED) COSTS.  THE AVERAGE OPERATING COST
                      FOR THE 22 SMALLER SYSTEMS IS S38,OOU/YR EACH, AND
                      FOR THE 8 LARGER SYSTEMS IS S65,000/YR EACH.
NEKOOSA PAPERS* INC.            NEPTUNE AIRPOL, INC.                    1290,000.       1207*000,
ASHOOWN, ARKANSAS               CAUSTIC SCRUBBING
211*000                         OPERATIONAL
                                 2/76

                      THE CAPITAL COST REPRESENTS THE EQUIPMENT COST IN
                      197!) DOLLARS.
NORTHERN OHIO SUGAR COMPANY     GREAT WESTERN SUGAR                     1423,000.        $30*100.
FINDLAY, OHIO                   SODIUM CARBONATE SCRUBBING
65,250                          TERMINATED
                                10/71

                      THE CAPITAL COST IS THE 10TAL INSTALLED COST OF
                      THE FGI) SYSTEM IN 1974 DOLLARS.  THE OPERATING
                      COST INCLUDES ELECT8ICIIY, MAINTENANCE* LABOR* AND
                      MATERIALS.
                                              174

-------
                                                                            STATUS TO APRIL  1979

                                     SECTION 13 (CONTINUED)

                                   INDUSTRIAL BOILER FGO COSTS


                                VENDUR
COMPANY                         PROCESS                                           COST
LOCATION                        STATUS                                   ........................
CAPACITY (SCFM)                 START-UP DATE                            CAPITAL        OPERATING
NORTHERN OHIO SU6AH COMPANY     GREAT WESTERN SUGAR
FRE.EMONT, OHIO                  SODIUM HYDROXIDE SCRUBBING
40,000                          OPERATIONAL
                                10/75

                      NO COST INFORMATION HAS BEEN SUPPLIED FOR THE
                      FREEMONT FGO SYSTEM.
PFIZER, INC.                    IN-HOUSE DESIGN                       *1,800,000.       $500,000,
EAST ST. LOUIS, ILLINOIS        LIME SCRUBBING
40,000                          OPERATIONAL
                                 9/76

                      THE CAPITAL COST IS THE TOTAL INSTALLED COST OF
                      THE FGO SYSTEM IN OCTOBER  197S DOLLARS.  THIS IN-
                      CLUDES ALL THE DIRECT AND  INOIHECT COSTS OF THE
                      PROJECT.  THE OPERATING COST IS THE DIRECT ANNUAL
                      OPERATING COSTS IN OCTOBER 1976 DOLLARS.  THESE
                      INCLUDE LIME  (»170,000), WASTE DISPOSAL
                      (1160(000), ELECTRICITY, WATER, AND MAINTENANCE
                      (MATERIAL AND LABOR).  THE TOTAL OPERATING COSTS
                      ARE PROJECTED TO BE S .04/MM BTU INCLUDING ALL THE
                      INDIRECT COSTS.  FOR A CAPACITY FACTOR OF 96X
                      (0900 HOURS OF OPERATION/YR 9 FULL LOAD), THIS
                      HILL CORRESPOND TO S740,000/YR.
PHILLIP MONRIS, INC.            FLAKT,  INC.
CHESTERFIELD, VIRGINIA          SODIUM  CARBONATE  SCRUBBING
39,000                          CONSTRUCTION
                                 6/79

                      NO COST  INFORMATION  is  AS YET  AVAILABLE.
REICMHOLU CHEMICALS,  INC.       NEPTUNE  AIRPUL,  INC.                     SZ70.000.
PEN3ACOLA, FLORIDA              SODIUM CARBONATE  SCRUBBING
60,000                          OPERATIONAL
                                  6/75

                       THE CAPITAL COST REPRESENTS ONLY  THE  INSTALLED
                       COST OF  SCRUBBER AND STUb  STACK  IN  1973  DOLLARS.
                                               175

-------
                                                                            STATUS TO APRIL  1979

                                     SECTION 13  (CONTINUED)

                                   INDUSTRIAL BOILER FGO COSTS


                                VENDOR
COMPANY                         PROCESS                                           COS1
LOCATION                        STATUS                                   ———	——————
CAPACITY (SCFM)                 START-UP DATE                            CAPITAL        OPERATING
RICKENBACKER AIR FORCE BASE     RESEAHCH-COTTRELL/BAHCO               S2,£00,000.       $207,000.
COLUMBUS, OHIO                  LIMESTONE SCRUBBING
55,000                          OPERATIONAL
                                 3/76

                      THE CAPITAL COST INCLUDES ADJACENT ELECTRICAL SUB-
                      STATION, SLUDGE DISPOSAL, EXTERNAL FLUES, AND
                      OTHER ATYPICAL EUUIPMENT IN 1975 DOLLARS.  THE OP-
                      ERATING COST REPRESENTS THE OVERALL 1977 COST FOR
                      35,000 TONS OF COAL.  DURING THE 1977 U.S.E.P.A.
                      DEMONSTRATION TEST, OPERATING COSTS MERE S5.61/TON
                      OF COAL.  THESE COSTS INCLUDE OPERATING AND MAIN-
                      TENANCE, LABOR, POftER, MATER, MAINTENANCE PARTS,
                      AND SLUDGE DISPOSAL, BUT DOES NOT INCLUDE DEPRE-
                      CIATION.
SANTA FE ENERGY COHP.           FMC ENVIRONMENTAL EQUIPMENT           SlfbOO,000.
BAKERSFIELO, CALIFORNIA         DOUBLE ALKALI  ICUMCbNTHATEO)
70,000                          CONSTRUCTION
                                 5/79

                      THE CAPITAL COST INCLUDES THE SCRUBBER, LIQUOR
                      REGENERATION EQUIPMENT,  AND DUCTWORK IN 1978
                      DOLLARS.
SHELLER GLOBE CORP.             W.*. SLY MANUFACTURING CO.               $80,000.
NORFOLK, VIRGINIA               SODIUM HYDROXIDE SCRUBBING
6,000                           INDEFINITELY SHUT DOWN
                                1975

                      THE CAPITAL COST IS THE ESTIMATED REPLACEMENT COST
                      IN 1976.  AN ESTIMATED MAINTENANCE COST OF tlbO/HO
                      4AS REPORTED C<> MAW-OAYS/MO).
ST. JOE ZINC CO.                BUKbAO UF MINES                      $12,700,000.
MONACA, PENNSYLVANIA            CITKATt PROCESS
148,000                         CONSTRUCTIUN
                                 4/79

                      THE CAPITAL COST IS IN 1977 DOLLARS ANU IS BEING
                      JOINTLY FUNDED BY ST. JOE ZINC, THE US EPA, AND
                      THE U.S. BUREAU OF MINES.
                                              176

-------
                                                                            STATUS TO APRIL  1979

                                     SECTION 13 (CONTINUED)

                                   INDUSTRIAL BOILER FGD COSTS


                                VENDOR
COMPANY                         PROCESS                                           COST
LOCATION                        STATUS                                   ........................
CAPACITY (SCFH)                 START-UP DATE                            CAPITAL        OPERATING
STRATHMORE PAPER COMPANY        MIKROPUL CORPORATION                  SI,400,QUO.       $162,000.
NOftONOCO, MASSACHUSETTS         OKI LIME SCRUBBING
22,000                          CONSTRUCTION
                                 5/79

                      THE CAPITAL COST IS TOTAL INSTALLED COST OF
                      THE ENTIRE FGD SYSTEM IN 1979 DOLLARS.  THE
                      ESTIMATED OPERATING COST INCLUDES ONLY DIRECT
                      COSTS OF RAM MATERIALS, MATER AND ELECTRICITY.
SUN PRODUCTION COMPANY          C-E NATCO                               SlOOrOOO.        835,000.
FELLOKS, CALIFORNIA             SODIUM HYDROXIDE SCRUBBING
6,000                           CONSTRUCTION
                                 5/79

                      THE CAPITAL COST IS THE  TOTAL INSTALLED COST
                      OF THE FGD SYSTEM IN 1979 DOLLARS.  THE ESTIMATED
                      OPERATING COST INCLUDES  ONLY DIRECT COSTS OF RAM
                      MATERIALS (50 LB/HR OF 50 X CAUSTIC, 4 GPM MAKEUP
                      MATER), AND ELECTRICITY  (16 HP).
SUN PRODUCTION COMPANY          C-E NATCO                               3100,000.        $35,000.
OILDALEr CALIFORNIA             SODIUM HYDROXIDE SCRUBBING
6,000                           CONSTRUCTION
                                 4/79

                      THE CAPITAL COST 16 THE  TOTAL  INSTALLED COST
                      OF THE FGD SYSTEM  IN  1979 DOLLARS.  THE ESTIMATED
                      OPERATING COS! INCLUDES  ONLY DIRECT COSTS OF RAW
                      MATERIALS (50 LB/HR OF SOX CAUSTIC, 4 GPM MAKEUP
                      MATEK), AND ELECTRICITY  (16 HP).
TEXACO INCORPORATED             CEILCOTE
SAN ARDO, CALIFORNIA            SODIUM HYDROXIDE SCRUBBING
347,000                         OPERATIONAL
                                11/73

                      NO ECONOMIC INFORMATION HAS AS  YET BEEN PROVIDED
                      BY TEXACO.
                                               177

-------
                                                                            STATUS TO APRIL  1979

                                     SECTION 13  (CONTINUED)

                                   INDUSTRIAL BOILER FGO COSTS


                                VENDOR
COMPANY                         PROCESS                                           COST
LOCATION                        STATUS                                   ........................
CAPACITY (SCFM)                 START-UP DATE                            CAPITAL        OPERATING


TEXACO INCORPORATED             OUCON COMPANY
SAN AROO, CALIFORNIA            SODIUM CARBONATE SCRUBBING
99,000                          CONSTRUCTION
                                 3/79

                      NO ECONOMIC INFORMATION HAS AS YET BEEN PROVIDED
                      BY TEXACO.
TEXASGULF                       SNEMCO INC.                             1250,000.
GRANGER* WYOMING                SODIUM CARBONATE SCRUBBING
140,000                         OPERATIONAL
                                 9/7b

                      THE CAPITAL COST IS FOR TWO SCRUBBING UNITS ONLY
                      AND IS IN 1976 DOLLARS.
TRANSCO TEXTILES, INC.          FMC ENVIRONMENTAL EQUIPMENT
AUGUSTA, GEORGIA                SODIUM CARBONATE SCRUBBING
50,000                          INDEFINITELY SHUT DOWN
                                 3/75

                      NO ECONOMIC INFORMATION WAS MADE AVAILABLE.
U.S. GYPSUM CORP.               NEPTUNE AIRPOL, INC.
OAKMONT, PENNSYLVANIA           DOUBLE ALKALI (DILUTE)
19,300                          NEVER SIAKTfcO-UF-

                      NO ECONOMIC INFORMATION HAS MADE AVAILABLE.
                                              178

-------
                         SECTION  14
                    PROCESS  DIAGRAMS  FOR
                INDUSTRIAL BOILER FGD SYSTEMS

                      LIST  OF FIGURES

NO.                                                    PAGE
14-1   ALYESKA  PIPELINE  SERVICE  CO.                     181
14-2   ARCO/POLYMERS, INC.                              182
14-3   CANTON TEXTILES                                  183
14-4   CARBORUNDUM ABRASIVES                            184
14-5   CATERPILLAR TRACTOR  CO.,  EAST PEORIA             185
14-6   CATERPILLAR TRACTOR  CO.,  JOLIET                  187
14-7   CATERPILLAR TRACTOR  CO.,  MORTON                  189
14-8   CATERPILLAR TRACTOR  CO.,  MOSSVILLE               191
14-9   CHEVRON  U.S.A. INC.                              192
14-10  FIRESTONE TIRE AND RUBBER CO.                    193
14-11  FMC (SODA ASH PLANT)                              194
14-12  GENERAL MOTORS CORPORATION, DAYTON               195
14-13  GENERAL MOTORS CORPORATION, PARMA                196
14-14  GENERAL MOTORS CORPORATION, PONTIAC              197
14-15  GENERAL MOTORS CORPORATION, TONOWANDA            198
14-16  GEORGIA-PACIFIC PAPER CO.                        199
14-17  GETTY OIL COMPANY, BAKERSFIELD,  (FMC)             200
14-18  GETTY OIL COMPANY, BAKERSFIELD,  (IN-HOUSE DESIGN)201
14-19  GETTY OIL COMPANY, ORCUTT                        202
                               179

-------
                  LIST OF FIGURES (Continued)






NO.                                                    PAGE



14-20  GREAT SOUTHERN PAPER COMPANY                     203



14-21  ITT RAYONIER, INC.                               204



14-22  KERR-MCGEE CHEMICAL CORPORATION                  205



14-23  MEAD PAPERBOARD COMPANY                          206



14-24  MINN-DAK FARMER'S COOP.                          207



14-25  MOBIL OIL COMPANY, BUTTONWILLOW                  208



14-26  MOBILE OIL CORPORATION, SAN ARDO                 209



14-27  NEKOOSA PAPERS, INC.                             210



14-28  NORTHERN OHIO SUGAR COMPANY,  FINDLAY             211



14-29  NORTHERN OHIO SUGAR COMPANY,  FREEMONT            212



14-30  PHILLIP MORRIS, INC.                             213



14-31  RICKENBACKER AIR FORCE BASE                      214



14-32  SANTA FE ENERGY CORPORATION                      215



14-33  SHELLER GLOBE CORPORATION                        216



14-34  ST. JOE ZINC CO.                                 217



14-35  SUN PRODUCTION                                   219



14-36  TEXACO, INC., SAN ARDO                           220



14-37  TEXACO, INC., SAN ARDO                           221



14-38  TEXASGULF                                        222
                               180

-------
GO
            nwr
                HC1
                Al
                                  KMT
                                    jaBDQESS
                                       Kt
                                           
-------
H1
00
NJ
                                   H«Tf«
            Figure 14-2.   Arco/Polymers, Inc.,
                 Monaca,  Pennsylvania.
                                                                                EQUIPMCin LIST
EQNO.
Al
F1
Ml
PI
P2
RF1
SSI
Tl
T2
T3
T4
TS
NAME
ABSORBER
F.D. FAN
MIST ELIMINATOR
RECIRCULATION
PUMP
REGENERATION
PUMP
ROTARY VACUUM
FILTER
SODA ASH SLURRIZER
RECIRCULATION
TANK
LINE REACTOR
THICKENER
SURGE TANK
LINE SLAKER
SIZE. FEET
17 DIA. X 62 HIGH
372 HP










MATERIAL
FLAKE GLASS LINED C.S.
C.S.
PVC
RUBBER-LINED C.S.
RUBBER-LINED C.S.







NO.
3
3
3
3
2
2

3
3


1
US SIRLAM NO.
IAU. Ib/hr a 1000
tclm i 1000
PMIICUUTCS. Ib/hr
SO;. Ib/hr
I1NPCMTUU. *F
HjO. Ib/hr
02. i
U0>. Ib/hr
VtLOCITI. ft/itc

(T)










"


-------
CO



















Q> " FLUE GAS IN
FRESH WATER SAFETY SHOWER fcl |


i MAKE-UP
LIZATION BASIN


^h
» A T



ft

r
JOI
_jaf J
-TTOVERF4
J ki.._ _1-
<


1
jn[

T2
iERtU







M £
r
	 • ,1
$
/ \
fvtt
I


^^_ \fi/
r?
1 
1
&
G
rt
1ST)]
JJ






SI
^— z;
im
-n
Tl
1 	 SLUICE GATE





f)
— ~- EXHAUST


•>.














•^
\
0 CP
&
TO ATMOSPHERE











,__TO DUST COLLECTOR
r^FOR ASH SLUICING
IYPASS
TO WASTE TREATMENT PLANT


Figure 14-3. Canton Textiles,
Canton , Georgia .








EQUIPMENT LIST
EQ NO.
n
PI

n
P3

P4

P5
SI
ST1
Tl

T2

T3
VI
NAME
F.O. FAN
MAKE-UP PUMP

MAKE-UP PUMP
MAKE-UP PUMP

RECIRCULATION
PUMP
BLEED-OFF
PUMP
SEPARATOR
STACK
RECIRCULATION
TANK

DYE RETENTION
BASIN
DYE COLLECTION
MANHOLE
VENTURI
SIZE. FEET
30 HP








8 OIA. X 12 HIGH


14.980 GAL.


MATERIAL









FIBERGLASS
FIBERGLASS
F.R.P.


CONCRETE

316 LSS
NO.
1
1

1
1


1

1
1
1
1


1
1
1

GAS STREAM NO.
RATE. Ib/hr » 1000
tctm * 1000
PMTICULATES. Ib/hr
SO?, Ib/hr
TEMPERATURE. *F
H20. Ib/hr
02. *
K0», )b/hr
VELOCITY, ft/sec

(T)

42
295.2
124.2
430





@


2">.5
J7.3






qp










0 LIQUID STREAM NO.
RATE. Ib/hr x 100
9f»
TOTAL SOLIDS. I
P«
TEMPERATURE. *F
H20. Ib/hr
SULFITE. ag/l
SULFATE. mtl\
CHLORIDE, ag/l
SPECIFIC GRAVITY
(|)










qp



7.5






Cj)

1-291

L0.4—
1.2. C






(S)

201








9

0-M1





1S2


(^










tl)










%










fy

>-201

8.0






9










1$










^










OJ)











-------
CO
**.
       nut CAS IN
           *•*—I®
(2)
 ®

n
f
f
Tl


_0i
J
                                         MME-UP »TER
                                         r~er
                                         TO ON-SITE

                                             TREA
                                               TKNT
Figure 14-4.   Carborundum Abrasives,

         Buffalo,  New York.
                                                                  EQUIPMENT LIST
EQHO.
A1
F1
F2
PI
P2
P3
P4
Tl
T2
¥1
NAME
ABSORBER
F.D. FAN
1.0. FAN
ABSORBER
RECYCLE PUMPS
VENTURI
RECYCLE PUMPS
BLEED-OFF
PUMP
MAKE-UP PUMP
RECIRCULATION
TANK
MAKE-UP TANK
VENTURI
SUE, FEET
8.5 DIA. x 38 HIGH




306PM
45 GPM


4 INLET x 13 HIGH
13 IN. THROAT
MATERIAL
316L SS








316L SS, HASTALLOY U
LINING
NO.
1
1
1
2
1
1
1
1
I
I
GAS STUAH NO.
RAH. >b/hr K 1000
ttlm * 1000
PARTJCULAUS. Ib/hr
SO?, Ib/hr
ItMPERATUM. *f
H20. 16/hr
0?. i
HOa. Ib/hr
¥UOCII«. ft/sec

(Y)

45.8

535.6
350





(£»

31.1

26.8
125





(3)










0 LIQUID STHLAM MO.
MK. Ib/hr x 100
9P"
TOTAL SOLIDS. X
PH
TEMPERATURE. *f
HjO. Ib/hr
SULFITE. Kj/1
SULFATE. ag/l
CHLORIOC. «s/l
SPECIFIC GSAV1T*
(j)



2.8






®










(p










<•>

1000









-------
                   TO STACK
                                                                                       EQUIPMENT LIST
CO
Oi
FILTER
CAKE
                                                              EXHAUST
       Figure  14-5.   Caterpillar Tractor Co.,  East Peoria.
EQNO.
n
Ftl
LSI
ME1
PI
n
n
P4
PS
P6
Rl
RF1
SI
SSI
Tl
T2
T3
T4
¥1
NAME
F.D. FAN
FILTRATE
RECEIVER
LIME SILO
MIST ELIMINATOR
RECIRCULATION
PUMPS
LIME REACTOR
PUMPS
FEED MATER
PUMPS
UNDERFLOW PUMPS
REGENERATED
LIQUOR PUMP
VACUUM PUMP
REHEATER
ROTARY FILTER
SEPARATOR
SODA ASH SILO
RECIRCULATION
TANK
LIME REACTOR
TANK
THICKENER
SURGE TANK
VENTURI
SIZE. FEET
700 HP

13.5 DIA. X 9 HIGH
.7 HIGH
75 HP. 1300 6PM


75 HP. 1300 6PN



5569 L8/HR

20 OIA. X 20 HIGH
13.5 OIA. X 7 HIGH
10 OIA. X 10 HIGH

13.5 OIA. X 9 HIGH
3.7 LONG X 1.8 HIDE
X 21.5 HIGH
MATERIAL
MILD STEEL

SS
INCOLOY
RUBBER-LINED C.I.


RUBBER-LINED C.I.





MILD STEEL
SS
MILD STEEL

MILD STEEL
316 SS
NO.
4
1
1
4
6
4
4
1


4
1
4
1
4
1
1
1
4

-------
GAS STRUM NO.
HATE. Ib/hr x 1000
•eta x 1000
rARTICULATCS. Ib/hr
SOj. Jb/hr
TEMPERATURE. *F
HjO. Ib/hr
02. I
HO*. Ib/hr
mOClTT. ft/sec

(I)

80

1040
350





(|)



104






Q)










(?) LIQUID STREW NO.
RATt. Ib/hr x 100
9P»
TOTAL SOLIDS. X
pH
TEMPERATURE, f
HjO. Ib/hr
SULFITE. •)/)
star ATE. 09/1
CHUWIOE. •)/!
SPECIFIC GRAVITY
(?)










©
2.3









(?)










CO










(*)










(^
2«.S









(fj





















(^










^
171.2

to







@>










0










o










181










e










®










®










®










a










^










€>










@










Q










(9










@










$










id










                                 Figure 14-5.   (continued)

-------
                                                                              EQUIPMENT LIST
00
-J
                                                        -LMDHU
       Figure 14-6.  Caterpillar Tractor  Co.,
                 Joliet,  Illinois.
        (continued)
EQM.
Al
Fl
LSI
NE1
PI
n
n
P4
PS
P6
P7
PS
SSI
Tl
n
n
T4
T5
T6
vn
VF2
VR1
VR2
NANE
ABSORBER
F.D. FAN
LIME STORAGE
TANK
HIST
aiNINATOR
BLEED-OFF PUMPS
LIME Mil TANK
PUMPS
SODA ASK MIX
TANK PUMPS
FEED MATER PUMPS
SLUDGE PUMP
SLUDGE PUMP
FILTRATE PUMPS
VACUUM PUMPS
SODA ASH STORAGE
TANK
PRIMARY LINE
NIX TANK
SECONDARY LINE
NIX TANK
SODA ASH
MX TANK
SURGE TANK
THICKENER
CLARIFIER
VACUUM FILTER
VACUUM FILTER
SPARE
VACUUM RECEIVER
VACUUM RECEIVER
SPARE
SIZE. FEET

MO HP

.7 HIGH













50.000 GAL





MATERIAL
316 S.S.
STEEL
C.S.
316 LSS








C.S.
C.S.
C.S.
C.S.
C.S.
C.S.
C.S.
MET SURFACES
904 SS
MET SURFACES
304 SS
C.S.
C.S.
NO.
2
2
1
2
4
2
2
2
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1

-------
CO
CO
GAS STRUM HO.
•ATE. Ib/hr * 1UOO
•eta * 1000
PARTICIPATES. Ib/hr
SO;. Ib/hr
TEMPERATURE. *F
H20. Ib/hr
02. *
HO,. Ib/hr
VELOCITY, ft/sec


LIQUID STREMI HO.
fcAtE. tb/hr » 100
9P»
TOTAL SOLIDS. 1
PH
TEMPERATURE. *F
H20. Ib/hr
SULFITE. ag/l
SULfATE. ag/l
CHLORIDE, ag/l
SPECIFIC GRAVITY
(J)

57.5

145.1
ISO






®










(?)

41.0
22.9
32.1
110






0
52.0

65







(7)

46.0

241.1
150





(J) LIQUID STREAM MO.
RATE. Ib/hr * 100
11.2 gp*
15.0 TOTAL SOLIDS. S
21.5 pM
125 TEMPERATURE. ^F
HzO. Ib/hr
SULFITE. ag/l
SULFATE. -9/1
CHLORIDE, ag/1
SPECIFIC GRAVITY

$










)D

.6








®



12.0






O



12.0






^|



12.0






©











$



12.0






©











$



12.0






CO











®










(•)










Q











3










a










^
10.4









4}
2.*










3










9










©











$










^











d










^











«9










4r*



12.0







$










9


15-20








e










o


15-2«








d










                               Figure 14-6.  (continued)

-------
                                                                                                                                                   us*
      RUE CAS
00
     RUE US

,j




UNO.
TL ° - c»
PI DRY CHEMICAL TRMSFER «




^









w^S-





>k
x^ X.
i r 1 1 i i 3


Al



. ®
w
I * Q

Jj
i
ri
LI
^^ ^^

1 1 j s * o* J



Al



©

W.
1® ®

151
•0.-L, jssi
4^" 1 1 4} HAKE-UP IMTER
J0^, JM,
9>
_l I
ou .Si &
i
M 	 j i—4 i
f ZeL- L
1 [ >w< | (fa 1
* — i jIoLj " I
^~£f~~^ >n 1
W 1
rj










o i i • •
1\'ITS"1^-J
-^HAKE-UP MUTER ^-i

® rRijT^l?*



c©
* 1
...>««
^^L re J-— • '
^



r ,
£? 	 *
¥


«






j





J


^



r

•«•>
«t^Aff'
1 y^











pa-
P7
8



^
VF



P7
LJT^
"**~"1





*




J
#5





nti



i — •
Ds
T

t



¥«]















« —
M
Fl
to
fc.*!
^
*.
r" *~
f



S> jcai.
X«
^
i ml
r^
-i
K1
M
n
n
N

n

i*


M

-^ L^UUOIFIU „,
Tl
TZ
n

T4

Figure 14-7. Caterpillar Tractor Co., »
Morton, Illinois.


















n

T?
(continued) »n
























w?

in
Ott
•ME
MHOOOU
F.O. rm
sn^ter

miT EmlMTW
cm wm twr
LM ffll TMK
rars
FH.TCI MSN FHO>
mown* furs

SUM! fUW

SUMX nor
•Tf 1 TiUTT MoloVC
rlLIIHlit fWtTj
MOMirwrs

son MM snow
TMK
KMMTUK
mi TMK
SKOKIMI LMC
mi TMK
SOFKMOC IMK

SOME TMK

TUUOOJt
CUOUF1Q

mi UOK
wwFiino
vcamnaoL
SMK
WPMIKCCnu
mammantM
snt. an
U UK I *.» Mil
I If .3 WON
ISO or MO. 1170 M
lot Hit i tut MICH
»• VIM. A ^ oulOn
4.S H. MBSS
1 ». 1770 ONI.
oo cm
10 OP. OM OK.
(MOCFH
S OP. 1740 MX.
W IT. 000 OBI.
BO CM
1 I0>, i30 OPK.
• cm
-co-
* ••> 11M MM
< ooFB 1/90 BoTil*
new
n OP. 10- oc MC.
MOO CM
14 Mfe. i a not
HOTPB
is out. 1 12 mcN
17.0*0 CM.
-00-
• OU. I M IBM
mo ML
10 OU. I U.t OJCN
mo COL
w ou. i w nai
2Z.S«fT>
40 OU. 1,1* OJCN
IS.OOOFTJ

wrr1. »cni
-00-

'•» •"-«*•"
-«-
mauM.
Jit I SS
C.S.

c.s.
m t u
C.S.
llf 1 SS
c.s.

c.s.

MJOKMJNEO L.i
-00-

OOUOBi MIDI

C.I.
CS.
CS.
C.S.

t.S.

C.S.
CJ.

C-i.
C.S.
on soonos
104 SS
onsiomcu
M4SS
•4SS
•M SS
00.
I
I

1
7
1
1
1

I

t
t

*

I
1
1
1

1

1
1

1
1
1

1
1
1

-------
vo
O
SAS SIUMt NO.
MIC. Ib/kr • 1000
•eta M 1000
MMICULATCS. Ib/kr
SO?. It/hr
ICMKMTMC. f
ma. wfcr
oz. *
MV. Ifc/hr
ttiocin. ft/ttc


LIQUID STKAN HO.
MTE. Ib/kr k 100
«•
101*1 SOLIDS. *
»"
TEMKMTUtt. *f
NJO. lb/kr
SUUITE. ag/l
SU.FAU. «|/I
CMLMIOC. Bg/1
SKCIf 1C CMVITI
(1)
•9.1
31.0
10S.6
179
410
1»00





a»
•0
1«
IS


taoo



I.0»
@
100.4
22.3
14. J
2S
114
1SOOC
*.5

77.1


O
««
11.2





US
2

114

1SOO
99040

1.01

6
en
12S

12.0
70

MO
912OI

1.00
(6)

11%
2

11«

1SOO
99140

1.01

$
611
m

12.0
70

560
9120(

l.OO
W

210
2

134

1SOO
99*40

1.01

(D
10
2.0

12.0
70
1000



1.00
(•)
S.17



70






$










10 o 4? 11S1 2(0 1.04 9 0 i.ao Q (00 9(9M ^ Figure 14-7. (continued)


-------
            EQUIPMENT LIST






EQNO.

TO STACK "I" LINE STORAGE
,Jl

_r~/2> "*' Kjucxnin
~A-Ai
*r~~>
y\  ® P)
- 'Q -^
PI 1 ™
Tl 	 1 p3

1l
1
f


TZ
© FROM LINE SODA SOFTNER




—
HATER *l&
~L
©
1 '

^.


74










0




T
^-,
1













1










gure 14-8. Caterpillar Tractor
Mossville, Illinois.

















j
19
"Cr



^


RfJ
OjjM^ FILTER
)cfx ^CAtt TO
Ol DISPOSAL
^1 1 J=k CVUAItCT
Ml 1 *Gf s~j I.«™J[J1
IFRI! g
^-^ PS

Co.,




n
FR1
ME1
ME2

HI
PI

P2
N
PS
P6

RF1
SI

Tl

T2
n
T4
VI

NAME
F.D. FAN
FILTRATE
RECEIVER
MIST aiNINATOR
MIST ELIMINATOR

REHEATER
RECIRCULATION
PUMP
BLEED-OFF PUMP
fAltCTVf pigMp
CAUSTIC PUMP
FILTRATE PUMP
EXHAUST PUMP
UNOERFUM PUMP

ROTARY FILTER
SEPARATOR

RECIRCULATION
TANK
LINE NIX TANK
THICKENER
SURGE TANK
VARIABLE THROAT
VENTURI
SIZE. FEET
250. 250. 700. 800 HI

.8 HIGH




















MATERIAL


INCOLOY
316 SS


















316 LSS
NO.
4

1
4
1

4







3
4


4




4
Steam flow characteristics for Boiler No.  2  are from a
SO. emissions,  January 21, 1977.
final report o;i  particulatc and
GAS STREAM W.
RATE. Ib/hr K 1000
•Cta x 1000
MRTICULATES. Ib/hr
SOz. Ib/hr
TEMPERATURE. *F
HzO. Ib/hr
02. «
HOx. Ib/hr
VELOCITY, ft/sec

(T)

40
604.8
440.1
413





(p

28.4
10.5
23.4
159





(3)










©










LIQUID STREAM HO.
RATE. Ib/hr *. 100
9P»
TOTAL SOLIDS, f
pH
TEMPERATURE. *F
HzO. Ib/hr
SULFITE. *9/l
SULFATE. ng/1
CHLORIDE. •?/)
SPECIFIC GRAVITT
©










®

34S

f.4»
n»

24.2
86.9

1.111
CO
2.°









(?)



6.48
Ijn

24.2
B6.9

1.1)1
®










<$
.2









fy



B.3






($










K|



8.4
120

13.7
70.8

1.108
fy




130





0^




130





&










W










u










«J
23.5

CO*







^











-------
10
to
              TO
             BYPASS
             STACK
                      iTO ATMOSPHERE
                                                AND
                                               SEALS
                                          TO WASTE
                                          DISPOSAL
                                           SITE
          Figure  14-9»    Chevron U.S.A.  Inc.,
               Bakersfield,  California.
EQUIPMENT LIST
EQ NO.
A1

Fl
PI

P2

P3

SI
ST1

Tl
T2

NAME
ABSORBER

F.D. FAN
RECIRCULATION
PUMP
MAKE-UP LIQUOR
PUMP
MAKE-UP UATER
PUMP
SODA ASH SILO
STACK

MAKE-UP TANK
BLEED STORAGE
TANK
SIZE. FEET
16.5 DIA. X
33 HIGH
75 HP







8 DIA. X
20 HIGH



MATERIAL
316L SS








C.S.
31 6L SS




NO.
3



6

6

3

3

3

3
GAS SIRUM NO.
RAH, Ib/hr * 1000
•Cta « 1000
PARTICULARS. lb/hr
S
-------
               i TO STACK
Figure  14-10.  Firestone Tire and  Rubber Co.,
           Pottstown, Pennsylvania.
                                                                   EQUIPMENT LIST
CQ NO.
Fl
LSI
PI
P2
RM
SI
SSI
Tl
T2
T3
T4
VI
NAME
F.D. FAN
LIME STORAGE
TANK
REC1RCULATION
PUHP
LIME REACTOR
PUHP
ROTARY FILTER
SEPARATOR
SODA ASH
STORAGE
RECIRCULAT10N
TANK
LIME REACTOR
THICKENER
SURGE TANK
DUAL THROAT
VENTURI
SIZE, FEET





4.67 OIA x 7.17 HIGH





.5-1.25 THROAT LENGTH
MATERIAL


RUBBER-LINED
CAST IRON
RUBBER-LINED
CAST IRON
316L S.S.
316L S.S.

316L S.S.
C.S.
C.S.
C.S.
3161 S.S.
NO.
1
1
1
1
1
1
1
1
1
1
1
1
GAS STRUM NO.
RATE. Ib/hr » 1000
tclm x 1000
PAR1ICULATES. Ib/hr
SO?. Ib/hr
UHPCRATURE. "F
H20. Ib/hr
02. i
NO.. Ib/hr
VELOCITY, ft/sec

(V)

13
450
Jt>0
100





Cp

10
11.7
34.2
130





Q)










(T) LIQUID STREAM NO.
RATE, Ib/hr * 100
9pm
T01AL SOLIDS, 1
pH
TEHCLRATURE, "F
H;0. Ib/hr
SULF1TE. mg/1
SULFATE, mg/1
CHLORIOf. ing/I
SPECIFIC GRAVITY
(5)










@

110








CD

.081








OP










(?)










d>










fy










($










iQi










^










<0i
i.a

55







1$











-------
                                         
KN1STER IMSH HATER
<3>
aUE GAS IN
—&
® „

A
.af1^
L<£
<: <;'<; <;
X"
XT
XT
"V
~x
~^
Al
^ 	
DEMSTER
T- ®
"
id




HASH HATER

©
FLUE GAS IN
^-TT
=*" L

.1
® Jii
A
U/SiT^
J®.

f £ f f
\"V
^<~~/
xr^v
A1


^ ®
__P1


TO IIASTE POND
        RIVER HATER —,P3    Q

  PWCCSS JIASTEMATtR     /-^__ ~
      SOOA ASHiLIQUOR *»
vo
it*
                                  (Z>
                                  P2
                                                  ©
                                                  P2
Figure 14-11.   FMC  (Soda  Ash  Plant),

         Green  River,  Wyoming.
                                                                                           EQUIPMENT LIST
EQNO.
A1
Fl
ME1
HI
PI
P2
P3
P4
PS
T1
NAME
ABSORBER
F.O. FAN
MIST ELIMINATOR
REHEATER
RECIROJLATION
PUMP
MAKE-UP PUMP
RIVER HATER
MAKE-UP PUMP
PROCESS MASTEUATER
MAKE-UP PIMP
SODA-ASH LIQUOR
PUMP
MAKE-UP TANK
SIZE. FEET
26.5 OIA. X 73 HIGH
193,000 SCFM


6000 GPM





MATERIAL
C.S.. CEILCOTE 103



RUBBER-LINED C.I.





NO.
2
2
2
2
2
2
1
1
1

GAS SlttAN NO.
RAH. U/hr » 1000
•eta « 1000
PMTICULATIS, lb/ftr
SO*. lb/hr
TtMPCMTURC. *F
HjO. Ib/hr
02.*
HO,. Ib/fcr
ULOCITY. ft/sec

QP

231


320





(J)

176


135





Q>

99


320





0 LIQUID STREAM NO.
RATC. Ib/hr » 100
279 9P»
TOTAL SOLIDS. S
PH
200 TEHPCRATURt. *F
H20. Ib/hr
SULFITE. ag/l
SULFATE. ag/l
CHLORIDE, ag/l
SPECIFIC GRAVITY
(5)

6800








(6)










qp

IUV<








(8)










(9)










'^










^










($










0





















d>










fy











-------
                 WSMOt
                                      nsna
 vo
 U1
Figure  14-12.  General Motors Corporation,
             Dayton,  Ohio.
                                                                               EQUIPMENT LIST
EQNO.
Al
F1
PI
P2
P3
Tl
T2
Tl
NAME
ADSORBER
F.O. FAN
RECIRCULATION
PUMP
CAUSTIC PUMP
BLEED-OFF
PUMP
RECIRCULATION
TANK
CAUSTIC TANK
BLEED-OrF
TANK
SIZE, FEET
C DIA. * 10 HIGH
35.000 SCFM.
9 IN. H.C.
200 CPU. 25 HEAD
806PM
SO 6PM
7.5 DIA. x 12 HIGH
9 DIA. x ID HIGH
t OIA. » t.l HICN
MATERIAL
nci ss
C.S.
OUBKR-LIMEO C.S.
C.S.
DUUER.LINEOC.S.
lid ss
C.S.
iidss
NO.
2
2
1
1
2
1
1
1
CAS STREAM M.
UTE. Ik/kr • 1000
acte • 1000
PAITICUUTES. th/hr
SO;. Ik/kr
TENPEMTUtC. *f
HjO. U/kr
02. t
N0«. Ib/fcr
VUOCITV. ft/scc

(i)

45
SS.3
111.5
400





^

JS.t
• .1
16.4
125





&










® LIQUID STBEAN M.

9P>
TOTAL SOLIDS. I
PH
TEMPEMTUU. *F
HjO. Ib/kr
SULFITE. ag/1
SULFATE. ag/l
CMLDtlOC. ag/l
SPECIFIC CWWITT
<&>

SA








«)

200

7.0






(n

SO








fo)










(•)










^










ft





















-y

»










IS










































-------
Figure 14-13.   General Motors Corporation;
 M              Parma, Ohio
                                                                              EQUIPMENT LIST
EQNO.
A1
F1
HI
PI
P2
P3
P4
PS
m
LSI
SSI
Tl
T2
T7
Ti
T5
T6
NAME
ABSORBER
F.D. FAN
REHEATER
RECIRCULATION
PUMP
RECIRCULATION
PUMP
UNDERFLW PUMP
UNDERFLOW PUMP
FILTRATE PIMP
ROTARY VACUUM
FILTER
LINE STORAGE
SODA ASH
STORAGE
CHEMICAL NIX
TANK
CHEMICAL NIX
TANK
CLARIFIER *1
OARIFIER 12
FILTRATE TANK
RECIRCULATION
TANK
SIZE, FEET
10.5 DIA. x 22.5 HIGH
200 HP. 12 IN. H.6.

2-750 GPM
2-550 GPM
700 GPM
100 GPM
25 GPM
300 GPM
500 SQ. FT. AREA
90 TON
35 TON
5000 GAL
5000 GAL
60 DIA. x 14 HIGH
60 DIA. x 14 NIGH
4 DIA. x 7 HIGH
2-3700 GAL
2-3000 GAL
MATERIAL
3161 SS
C.S.

C.S..
RUBBER-LINED
RUBBER-LINED
RUBBER-LINED
RUBBER-LINED
RUBBER-LINED
C.S.. POLYPROPYLENE
CLOTH
C.S.
C.S.
C.S.
C.S.


C.S.
C.S.. TAR
COATING
NO.
4
4
4
4
3
2
2
2
2
2
1
1
2
1
1
1
4
GAS STRUM NO.
RAH. Ib/hr a IUOO
Ktm > 1000
CAHIICU.AUS. Ib/hr
JO?. Ib/hr
TCNPUATURE. *F
MjO. Ik/ftr
02. I
BO,. Ib/hr
VUOCITI. ft/sec

(V)

58. t
73.2
2*f-
397
S50





(?)

JS.S
60.1
41. S
152





($










0 LIQUID STRUM NO.
MTC. Ib/hr a 100
9P»
TOTAL SOLIDS. %
P«
TtMPEMTURE. *F
H]O. Ib/hr .
suinu. .9/1
SUUATE. ag/l
CHLORIDE. •(/!
SPCCIFIC GMVITT
^










^










C')










C')










<$










^










^










^

1200








(|










|f)


15-21







ft










4*










to










44'










4*










^


so







y '








1


-------
 FLUE B>S III   0>
      C3
VD
® g TO MKTflHTn
 PI
Figure 14-14.   General Motors Corporation,
             Pontiac, Michigan.
                                                                            CDUIMUT LIST
EO NO.
Al
n"
PI
P2
P3
N
PS
N
Tl
T2 -
MANE
ARSORKR
I.D. FAM
RECIRCULATION
PIMP
IMOCRFUM
PIMP
RECIKULATION
PIMP
RECIRCULATION
PIMP
MAKE-UP PIMP
MAKE-UP PIMP
MUMS IBM
CLARiriER
SIZE. FEET
12 DIA. x 21. S HIGH









MATERIAL
3ISLSS









NO.
I
t








CAS STRUM NO.
•ATE. Ib/hr » 1000
•eta « 1000
PARTICIPATES. Ib/hr
SO?. Ib/hr
TENPERATURE. *f
NjO. Ib/hr
02. i
HO,. Ib/hr
VELOCITT. ft/sec

(Y)

91
• S.5

160





OP

75
28.2

360





(3)










@ LIQUID STRUM MO.
RATE. Ib/hr • 100
«•
TOTAL SOLIDS. S
PH
TEMPERATURE. *F
HjO. lb/br
SULFITE. ag/1
SULFATE. ag/l
CHLORIDE, ag/1
SPECIFIC GRAVITY
CD










@










Q)










(R)










$

10-20
5.0







^

405








^

325








^

SO








^

50








^










^










^










4











-------
10
CO
                                                         MNunac
    Figure 14-15.  General Motors Corporation,  Tonowand*,
                    New York.
                                                                              EQUIPMENT LIST
CQ NO.
F1
n

n
P3

P4

PS

re

»7
SI
ST1
Tl
T2
T3

T4
TS
T*

VI

NAME
i.o. FAN
RECIRCULATION
PUMPS
OVERFLOW PIMP
CHEMICAL FEED
PIMPS
SCRUMER BLOU-
DOM PIMPS
HASTE TREATMENT
TRANSFER PIMPS
CAUSTIC FEED
PUMPS
ma -UP PUMP
SEPARATOR
STACK
RECYCLE TANK
OVERFLOU TANK
CHEMICAL FEED
TANK
AERATION MIXER
HOLDINCTANK
CAUSTIC STORACC
TANK
VARIARU 1NRMT
vonwu
SIZE. FEET

























MATERIAL













116LSS
S.S.









muss
NO.
4

t
1

1

2

Z

\
\
4
I
4
1

1
1
1

1

4
MS STREAM •.
RATE. Ib/hr * 1000
M«fc« 1000
PAtTICULATES. Ik/tar
SOJ. U/kr
TDKM1UC. *T
NIO. Wfcr
•2. *
•V. IWkr
VOOCTTT. ft/MC

©

3*.«
1M.O
257.3
ISO





$

3«.0
194. q
210.I
4 100
•!•
10.4 1DTM. SOLIDS, f
21. • pH
TEMPERATURE. T
HjO. Ib/kr
SULFITE. •)/!
SULFATE. «9/I
CHLORIDE, ^/l
SPECIFIC CMVITV
Q



«.A






qp



C.A






(J)



7.n






(t)

7«2

7.0






(')

721

7.0






^












IS-101
<1.0







Q>


<1.0







<^)











-------
                                 rasTwx
vo
vo
                                      -W MMX MTtl
                                      mr mu MOCESS
Figure 14-16.   Georgia-Pacific Paper Co.
                 Crossett,  Arkansas.
                                                                             MUtMOn LIST
COM.
n
ri
si
Tl
VI
HMC
F.O. FM
•CCIKUUT10H
NNP
SCMMTQft
•ECIKUUTION
TAW
vomfti
SIZE. FttT

50006IH
24 s SS HIGH

».» HIDE tt JO NIGN
MKTEtlM.

3MU.MBI.UW>
304SS. FIKKLASS
LINO)
J04SS
KMSS
w.
1
1
1
1
1
CAS STUAHNO.
MfE. W»r » 10M
Mta« 10I»
MIIKUUTES. IWhr
SO}. U/hr
TEHKMTURf. f
M20. U/kr
02. 1
MW. tb/kr
tlLOCITY. ft/iec

<0

320
765
1094
110





(|)


SO
10*-
164






W










®










LIQUID SIMM NO.
RATE. Ib/hr » 100
9P"
lOTM. SOIIDS. S
pH
TEM>EMTW£. *F
HjO. Ib/hr
SULF1TE. ma/\
SULfATE. ag/l
CMLORIK. og/l
SPECIFIC GIUVITT
(|)










®

5000








cp

2100








(g)

2000

7.5






®










^










0










($










^










^










^










^










$

'•









-------
IO
o
o
                                   HAKE UP
                                   MATER
    Figure 14-17
Getty Oil Company.
Bakersfield,  California
FMC Environmental Eqmnt,
                                                                          EQUIPMENT LIST
EQNO.
Al
F1
ME1
PI
Tl
T2
NAME
ABSORBER
F.O. FAN
HIST ELIMINATOR
RECIRCULATION
PUMP
DISPOSAL TANK
SODA ASH
MIX TANK
SUE. FEET
13.5 OIA. X 35 HIGH




42.000 GAL
MATERIAL
31 6L SS

INCONEL


1/4" C.S.
NO.
1
1
1
1
1
1
CAS STKAN NO.
WTt. Ib/Nr x I00»
•eta R 1000
PMTICUIATCS. Ik/kr
J0|. Ik/kr
TENPCM1UK. *F
NlO. Ik/kr
t?. I
•Ok. Ik/kr
niocuf. U/MC

V?

130


500





®

•I.«


1)0





<$










(J) liqUID STMAN NO.
Wit. Ib/hr x 100
IP-
TOTAL SOLIDS. S
*
TCNPtNATME. *F
HjO. Ib/hr
SUiriTE. •«/)
SW.FATE. «9/l
CMLORIOC. mt/\
SPECIFIC HAVITT
©

10








(*)

1000

«.l






(J)










Ci)










(i)










V











-------
ME1




Fl
nuc ""(ET1
(AS
1 1U 3
A



1 ,
1

Al

^n

©


0

rs ®
&?
P2



Figure 14-18 . Getty





PI






Oil

SODA ASH
CAUSTIC




TO
DISPOSAL^
®

Company ,
Bakersfield, California
In-House Design
to
o
M




•


EQUIPMENT LIST

EQ. NO.
Al
Fl
ME1
PI
P2

P3

Tl
T2

NAME
ABSORBER
F.D. FAN
NIST ELIMINATOR
RECIRCULATION
PUMP
BLEED-OFF PUMP

ALKALI FEED
PUMP
DISPOSAL TANK
ALKALI MIX
TANK

SIZE. FEET
18 DIA. X 33 HIGH
500 HP. 11 IN. HG

40 HP. 1000JJPM
40 HP. 1-2 GPM




20 DIA. X 20 HIGH
42,000 GAL.

MATERIAL
316L SS
C.S.

C.S.. RUBBER-
LINED
316L SS. RUBBER-
STATOR


C.S.. RUBBER-
LINED
C.S.

NO.
9
9
9
9
9



9
9


GAS STREAM NO.
RATE. Ib/hr x 1000
•cfn x 1000
PARTICULATES, Ib/hr
SO*. Ib/hr
TEMPERATURE, *F
HjO, Ib/hr
OZ. t
NO,. Ib/hr
VELOCITY, ft/sec

(T)

200


500





qp

127


150





QP










(?) LIQUID STREAM NO.
RATE. Ib/hr « 100
9P"
TOTAL SOLIDS. X
pH
TEMPERATURE, *F
HzO. Ib/hr
SULFITE. ng/1
SULFATE. 019/1
CHLORIDE, mg/l
SPECIFIC GRAVITY
©

10








QP

lonn

"•*-«





1.15
Cj)










CJP










19)










W










fy

150








V










($










Oil










03)










®











-------
10
o
to
               TO ATKKPM.U
               f\
           n
                                   CAUSTIC
Figure 14-19.  Getty Oil Company,
      Orcutt, California.
                                                                      EQUIPMENT LIST
EQ. NO.
Al
Fl
HC1
PI
P2
Tl
T2
NAME
ABSORBER
F.D. FAN
HYOROCLONE
PUMP
CAUSTIC FEED
PUMP
DISPOSAL TANK
CAUSTIC MIX
TANK
SIZE. FEET
4 DIA. X 10 HIGH





42.000 GAL
MATERIAL
316L SS
C.S.

316L SS


1/4" C.S.
NO.
1
1
1
1
1
1
1
CAS STREAM NO.
•ATE. Ib/hr x 1000
•CfB X 1000
PARTICIPATES. Ib/hr
SO?. H>/hr
TEMPERATURE. *F
HzO. Ib/hr
02. 1
NOx. Ib/hr .
VaOCITY. ft/sec

(1)

20


son





(?)

12


ISO





(3)










0 LIQUID STREAM NO.
RATE. Ib/br x 100
9P*
TOTAL SOLIDS. %
P«
TEMPERATURE. *F
HzO. Ib/br
SULFITE. Mg/1
SULFATE. ag/1
CHLORIDE. *g/l
SPECIFIC GRAVITY
©

2








(§)



6.8






(7)










QP










®










(^










^










^










^










^










(^










K^








•

^











-------
                      EIMUIST TO A1MSPMCH
to
o
                                               TO AWOSFKK
                                           CAIKTIC RBI OQIIWMI.mil
                                           *-TO ASH TOM)
          Figure  14-20.   Great Southern Paper Co.
                            Cedar Springs, Georgia.
EQUIPMENT LIST
EQNO.
Fl
PI
P2
51
ST1
Tl
72
VI
NAME
P.O. FAN
RECIRCULAT10N
PUMP
ASH PUMP SLUDGE
SEPARATOR
(RADIAL VANE)
STUB STACK
RECIRCULATION
TANK
HOLD TANK
VENTURI
SIZE. FEET
900 HP. 900 RPM
150 HP, 2400 6PM
5006PM
24 DIA. X 45 HIGH
200 FT.
18 DIA. X 15 HIGH


MATERIAL
ALLOY LINED STEEL
RUBBER LINED C.I.
RUBBER LINED C.I.
S.S.
s.s.
S.S.

316 LSS
NO.
4
3
2
2
2
1
1
2
CAS STREAM W.
RATE. Ib/hr 11 1000
Kfa « 1000
rARIICULAIES. Ib/hr
SO?. Ib/kr
TEMPERATURE. *F
MJO. Ib/hr
oz. *
NO*. Ib/hr
VELOCITT. ft/MC

(T)

ISO
6900
2500
425





®

211
•5
250
11O





(1)










0 LIQUID STROM MO.
RATE. Ib/kr « 100
9P"
TOTAL SOLIDS. I
PH
TEMPERATURE. *F
HjO. Ib/hr
SULFITE. •!/!
SULFATE. B9/1
CHLORIDE. •»/!
SMCIFIC UAVIIV
©










$

"»So








(j)










(8)

1200
2-5







(9)

1600
3-5







^

1600
2-5







^

600











to











-------
    MAKE-UP MATtR ,
                        FLUE
                           -to
                                                -TO STACK
  51
_JIII IU
                               WSTDHTER TREATKNT
o      Figure 14-21.   ITT Rayonier, Inc.
*•                     Fernandina Beach, Florida.
                                                                     EQUIPMENT LIST
CO M.
Fl
PI
SI
T1
«1
HMC
P.O. FAR
RECIMULATIW
PUMP
SEPARATOR
RECIRCuUTHM
TANK
VARIABLE THROAT
VENTURI
SIZC. FEET
103S HP
75 HP
16.S OIA. i 38 HICH


MATERIAL

31CSS
316L SS

31CL SS
HO.
2
2
2
1
2
CAS STREAK M.
RATE. Ib/hr • 1000
•eta « 1000
PARTICULATES. lk/hr
SOZ. Ib/hr
TEKHRATURE. f
H20. lk/hr
02. X
ROk. Ik/br
mociTv. rtysK

(T)

its
1300
1132.1
«0





@

140
1340
9*1.0
460





(3)


30
169.9






0 LIQUID STREAM M.
RATE. Ib/hr « 100
9P>
30 TOTAL SOLIDS. I
144.2 PM
TEMPERATURE.^
MjO. Ib/hr
SULFITE. ag/1
SULFATE. >9/1
CHLORIOE. ••/!
SPECIFIC OIAVITV
(D

100








$

1470








(j)

ISO








(jp

1620








$










<$










<^










^










^










^










^










^










^











-------
                              -» TO STACK
to
o
Ul
            aUEGAS HI
Figure 14-22.   Kerr-McGee Chemical  Corp. ,
             Trona, California.
                                                                                EQUIPMENT LIST
EQ NO.
Al
n
HI
PI
re
Tl
MANE
ABSORBER
F.D. FAN
REHEATER
RECIRCULATION
PUMP
ALKALI FEED
PIMP
BURUTE TANK
SIZE. FEET
30 DIA. x 35 HIGH

50*F REHEAT
1256PM


MATERIAL
C.S.. FIAKEGLASS
LINED. 317L SS
TRAYS
C.S.
C.S.
C.S.. RUBBER-LINED


NO.
2
2
2
2
2
2
CAS STKM M>.
UTE. Ib/kr K 1000
•eta « 1000
PARTICULATES. Ib/hr
SO;. Ik/kr
TENPEMTUK. f
HZO. IWHr
02. S
•Ox. Ib/kr
VELOCmr. ft/tec

(p

361


320





®

29*


175





(3)










0 LIQUID STREMt HO.
MTE. Ib/kr « 100
91"
TOTAL SOLIDS. X
pH
TEWEMTURE. *F
HjO. Ib/hr
SULFITE. ng/1
SULFATE. •)/!
CHLORIDE. •!/!
SPECIFIC CWVITT
(p










<8»










(?)



*-2"i






<$>

125

ft. 5






t?)



6.5






$










(fj










«9










o^










"^










(^










^










©





1





-------
STACK
FLUE
GAS
 IN
 PULP HILL
                    MAKE-UP
                     tttTER
to
o
Figure 14-23. Mead Paperboard Co.
Stevenson , Alabama •

                                                                               EQUIPMENT LIST
EQ. NO.
A1
Fl
PI
P2
Tl
T2
NAME
ABSORBER
F.D. FAN
RECIRCULATION
PUMP
CAUSTIC PUMP
RECIRCULATION
TANK
SODIUM CARBONATE
TANK
SIZE, FEET






MATERIAL
316 SS
C.S.


FIBERGLASS

NO.
1
1
1
1
1
1
MS SIMM IB.
MTC. Ib/hr a 1000
•eta > 1000
rAITICULMES. Ib/hr
S0j. lk/hr
TENPEMTME. T
HjO. lk/hr
02. I
Mfc. W
waocin. rt/stc

(T)

17S


450





TOTAL SOLIDS. S pH TEPPEMTURC.^F MjO. Ib/hr SULFITf . •!/! SULFATE. ag/l CHLORIM. >9/l SPECIFIC CMVITT 9 3000 MM? $ 6nn (7) 20-2! / .n- 8.' ® • 20-2! C?) ^ 1" <$ 0^1 d> HI* d$ oji


-------
10
o
                                          AMMONIA-LADEN
                                          PROCESS HATER
                                     ?J AMMONIA-LADEN
                                       PROCESS HATER
                                              UASTEHATER
                                              TREATMENT
                                                AND
                                               STORAGE
      Figure 14-24.   Minn-Dak Farmer's Coop.
                         Wakpeton,  North  Dakota,
                                                                                     EQUIPWNT LIST
EQ NO.
Fl
Ml
PI
Tl
VI
MK
F.O. FAN
HIST
U1MINATOR
RECIRCULATION
PUMP
RECIRCULATION
TANK
VARIABLE THROAT
VEHTUR1
SIZE. FEET


75 HP 3000 6PN
10 x 10 x 10

MATERIAL

316SS

CONCRETE PIT.
TAR LINED
31 (L SS
NO.
2
2
2
2
2
GAS STREAM NO.
RATE. Ib/hr x 1000
acta x 1000
PARTICULATES. Ib/hr
SO?. Ib/hr
TEMPERATURE. *F
HpO. Ib/hr
02. »
HOx. Ib/hr
VELOCITY. ft/sec

CO

125
245. 4
767










0 LIQUID STREAM. NO.
RATE. Ib/hr x 100











(f)










Id










0$











-------
                                                                       TO ATOHSPHERE
O
00

fWl fiAS



i
u
|N 1 1


i

HASTE DISPOSAL <§>
POND
\












r
i




-»f\



\
s^ ^>
r 5Ei









»1 -< ® c-, f 1
/ * LJ
r
1&~ORA,N
2 14-25. Mobil
Oil
California
Company, Buttonwillow,
•



EQUIPMENT LIST
EQ NO.
Al
ME1
PI
P2
Tl
NAME
ABSORBER
MIST ELIMINATOR
RECIRCULAT10N
PUMP
CAUSTIC FEED
CAUSTIC STORAGE
TANK
SIZE, FEET





MATERIAL
C.S.. EPOXY COATED
FRP
316 SS


NO.
7
7
7
7
7


GAS STRUM NO.
RATE. Ib/hr x 1000
*cf« x 1000
PARTICULATES. Ib/hr
S02. Ib/hr
TEMPERATURE. *F
HjO. Ib/hr
02. I
NO*. Ib/hr
VELOCITY, ft/sec

(T)

11.4

30
ss«





Cp



4.5






(T)










0 LIQUID STREAM NO.
RATE. Ib/hr x 100
9P"
TOTAL SOLIDS. S
pH
TEMPERATURE. "F
H;0. tb/hr
SULFITE. ng/1
SULfATE. nig/I
CHLORIDE. "9/1
SPECIFIC GRAVITY
©










dD










(7)










C!P

15








C9)
•









^










05










HD










(Q)










(Hi










dsi










®






















-------





S

NCI



auc CAS iifl>^




_CIMIUST

J®~»
Bill




Al
***








TO ATM!










MOE






® ,^_ CAUSTIC AM) ALKALIK
ff^OIl FIELD HUTOHTO























 ~- HASTOMTE* DISPOSAL ZOIC

	 --


















Figure 14-26. Mobil Oil Corp., San Ardo/
California.






to
0
*° US STREAM M.







(T)
ff)







CD







(?) LIQUID STREAM NO.







d)






(QUIPKn LIS1 STSTCH 1
(OM.
Al

Fl

•1
n

n
STl
MM
AISOMMS


I.D. FANS


HIST UINIMTOI
KCIKUUTUM
FUNK

NM£-VP PIMPS
STACK

sin. rut
4 OIA. « tO NICK








NATUIAL
SMCU 31H SS
TKATi 311 SS
C.S.. 3IIL SSLMIIKS
01 CASIMS
3IM. SS, LIKD MITN
•MRTMtt-IC t9On BftlM
nMHlU|>|li ft3f|Ml ••••••I




FIKMUSS
M.

20

to


20

It
(QVIMW IIST STOW t
MiO.
Al

ft
Ml

n

n
STl
MM
AISOIKRS


1.0. FAtt
HIST UmUATOI


KCIKUUTION
PUMPS

NAtt-UP PIMPS
STACKS
Sill. FltT NATU1AI
I.I OIA. 1 n MM







»
CU 31ft SS
TMtS 311 SS
C.S.. 31N. SS LIMMS
MCASMCS
SIM. SS. HMD MITH
PKNOLIC (PUT NUM






FIKMUSS
M.

0
•
•

0
0
•


(D (D CD
CD

10
(DOG

<& @ 03 ®
US STREAM M.
RATE. Ib/hr « 1000
•eta i 1000
MRTICULAIES. Ib/hr
S02. Ib/hr
TEMPUATURE. *F
N20. Ib/hr
02. ft
Nft«. Ib/hr
MLOCITI. ft/Mt

(^)

8

(8
470





(I)



£.8






(3)










t?) LIQUID STREAM NO.
RATE. Ib/br i 100
gp"
TOTAL SOLIDS. S
pH
TEMPERATURE. *f
HjO. Ib/hr
SULFITE. «9/l
SULFATE. «9/l
CHLORIDE, ag/l
SPECIFIC CRAVITV
^

75








(»)










^










ro










CO










^










4)










4?




^




«




STREAM FLOW CMAI





n




Msmi




0^




ucmi
91 1




V




ITICS




4r*




—




GAS STtlAN NO.
NATE. Ib/hr * 1000
•cto M 1000
PUTICULATES. Ib/hr
SO?. Ib/hr
TENPENATIME. *F
MJO. Ih/hr
02. 1
NO,. Ib/br
VEIOCITI. ft/tM

CO

18

153
470









6.0






(8)



6.0






OP



8.0






<$










^










(|2)




n





4?




mown
n




V




lOHCMAI
IR mti




OJJ




ucrni
[Ml




4£




ITICS.





dj)











-------
                               10STKI
10
M
o
Figure  14-27,
Nekoosa Papers,  Inc.
Ashdown,  Arkansas.
                                                                       EOjUimENT LIST
EQNO.
n
n
n
n
si
n
n
n
MK
F.O. FM
KCIKUUTION
NMP
•LEED-OFFNNP
mamr MMP
SEPARATOR
RECIKUUTIM
TMK
NUE-VPTMUC
VARUULE THROAT
VERTUR1
SIZE. FEE1

2200 «m
300 6TM


10 OIA. I
IS NUN


HtTERIM.




NILD STEEL
FLAKED GUSS
iniM
MUD STEEL
MDLUED


n.
2
2
2
2
2
2
1
2
MS S1MMIM.
•Ml. Ik/kr • MM
•ctaM 1000
MITICHUtTES. Ifc/fcr
SOf. Ik/kr
TIMKM1UK. *F
"It, M/hr
•2. •
•tj. Ih/kr.
•aocm. ft/Me

0

125
2112
12S»
3SS





^


27
12*






(3)










© Liquio SIOUN •.

OP"
TOTAL SOLIDS. S
f*
TOTEMTUH. *T
HzO. Ik/kr
SULFITE. •!/!
SULFATE. B|/|
OUUK. ••/!
SKC1FIC COMI1V

2.1
SB

C.fl



















"^




















7.2
4M








If










^










tt










o










(A










•S"










7JT










IT


•








-------
                               EXHAUST
                                 TO
                              ATMOSPHERE
                                       OEMISTER
                                        WASH
                                        MATER
                                                  TO HOLDING
                                                   POND  v
Figure  14-28.   Northern Ohio  Sugar Co.,
                   Findley, Ohio.
                                                                                  EQUIPMENT LIST
CO NO.
n
HE)
PI
PZ
P3
ST1
Tl
V}
NAME
F.D. FAN
HIST ELIMINATOR
RECIRCULAT10N
PUMP
HAKE -UP PUMP
UASTEMATER PUMP
STACK
RECIttCULATION
TANK
VARIABLE THROAT
VENTUR1
SIZE. FEET





7.5 OIA


MATERIAL

SHILI-316L SS





31 6L SS
NO.
2
1



1

T
CAS SIKt AH NO.
RATE. Ib/ltr * 10UU
«cfn > 1000
PARTICIPATES. iD/hr
SO?. It/nr
UNPERAIURE . °F
njli. Tb/hr
o:.
l.0». iD/hr
VlLOCm. ft/ sec

(;o

120

2t.J. 1
MS





t?)



(.). )






$










0 IIQOID STREAM NO.
RATE. ID/hr » luO
9P"
TOTAL SOLIDS. I
pH
TENPlRAIURE.^'f
HjO. Ib/hr
SULflTt. 119/1
SUIFATE. H9/I •
CHLORIDE. MQ/I
SPECIFIC GRAVITY
<$)










16)

r.nn








(V)

ion








^

inn








^

un








&





















^





















(To










<$










^










6











-------
                                       —•- TO
                                           I
Figure  14-29.  Northern Ohio  Sugar Co.,
                Freemont, Ohio.
HOLDING
                                                                      EQUIPKHT LIST
EQ n.
FI
MCI
PI
P2
P3
ST1
T1
VI
HME
r.o. FAN
MIST ELIMINATOR
RECIRCULAT1M
PUMP
MAKE-UP PIMP
MASTEUATER PIMP
STACK
REC1RCULAT10N
TANK
VARIABLE THROAT
VEMTM1
SIZE. FEET








MATERIAL








•0.
2
1



I
1
1
GAS STREAM NO.
RATE. Ib/hr a 1000
ICfB H 1000
PADIICULAIES. Ib/kr
SO?. Ib/hr
TEMPERATURE. *f
HJO. Ib/hr
02. »
ROm. Ib/hr
VELOCIII. ft/sec

(T)










(?)










(3)










0 LIQUID STREAM NO.
RATE. Ib/hr » 100
9P>
TOTAL SOLIDS. S
PH
TEMPERAIURE. *F
HzO. Ib/hr
SULFITE. *9/1
SULFATE. «J/1
CHLORIDE. »9/l
SPECIFIC CMVITV
©










(£)










(J)










0





















o










(^










ft










<$










^









-

-------
                            •TO STACK
ro
M
U)
                                                 SOU* ASH
                                                  DISPOSAL
Figure 14-30.  Phillip Morris,  Inc.

                 Chesterfield, Virginia.
                                                                                 EQUIPKHT LIST
EO n.
Al
F1
HI
NE1
PI
n
n
01
Tl
T2
RME
MSOR8ER
F.O. FAH
REHEATER
HIST aiWHATOR
RECIRCULATION
PUMP
MAKE-UP PM>
BLEED-OFF PUMP
PREQUCHCHER
SODA ASH TAHK
AERATOR
SIZE. FEET
9 DIA I 35 NIGH



1000 GPN


6 SHI
12 OIA I 22 HIGH

MATERIAL
FRP


POLYPROPYLENE
RUBBER-LIMED
MBER-LMEO
RUHER-LIHED

C.S.

HO.
1
1
1
1
2
2
2
1
1
1
CAS SIMAH NO.
•AH. Ib/hr > 1000
•eta ii 1000
PART1CULAIES. tb/kr
SO?. Ib/hr
TEHPERATUU. *F
HjO. Ib/hr
02. X
HO.. Ib/hr
•ILOC1TV. ft/uc

(T)

IS


1%0



10

^

40


110



10

(3)




ISO





0 LIQUID SHUN HO.
RATE. Ib/hr » luO
9P«
TOTAL SOLIDS. I
PH
IEHPERA1URE. *F
HjO. Ib/hr
SULflTE. *9/l
SULFAIE. ag/l
CHLORIDE, ag/l
SPECIFIC CRAVIIT
(S)

1000

6.S
110





$



7.5






(?)










Q










tj)










^

5-11

*.S






$










<$

«








Q










9










$










o










o











-------
N>
   HUE
         Figure 14-31.   Rickenbacker Air Force Base.
                          Columbus, Ohio.
                                                                           EQUIPNUT LIST
CQ NO.
Al
F1
LSI
MCI
PI
n
P3
ST1
11
T2
T3
T4
NAME
ABSORBER
F.D. FAN
LINE STORAGE
MECHANICAL
COLLECTOR
REC1RCULAT10N
PUMP
RECIRCULATION
PUMP
UNDERFLOW PUMP
STACK
LIME MIX TANK
2ND STAGE LEVEL
TANK
1ST STAGE LEVEL
TANK
CLMIFIEI
S12E. FEET
12 01 A, i 61 HIGH
600 HP
12 DtA. i 60 HIGH
(120 TONS)




S.S DIA. * 20 HIGH



KDIA.
MATERIAL
316L SS

3/16"
A-36 STEEL

RUBBER-LINED
RUBBER-LINED
RUBBER-LINED
FRP
316L SS


MOW
HO.
1
1
1
1
1
1
1
1
1
1
1
1
GAS STREAM NO.
RAH. Ib/hr * 1UOO
•eta « 1000
PARTICULATES. Ib/hr
SO?. Ib/hr
TEMPERATURE. *F
N?0. Ib/hr
02. '•
MO.. Ib/hr
VELOCITY. ft/Me

(i)

108
577. S
619.1
475





(£)


11.6
64.0






9/l
SULFATE. mt/\
CHLORIDE, ag/1
SPECIFIC GM«m
$










$










(£










$


12.0
c.o






$










$










0



4.8






®


<40







fl^










ft



S.S






^










1$










(j>










U|)



8.5






0











-------
to
M
(Ji
Figure  14-32
Santa Fe Energy Corp.,
Bakersfield, California,
                                                                               EQUIPMENT LIST
EQNO.
AI
n
NE1
PI
P2
P3
P4
PS
K
P7
P8
RF1
T1
T2
T3
T4
NAME
ABSORBER
F.O. FAN
MIST aiNINATOR
RECIRCULATION PUMP
BLEED-OFF PUMP
MAKE-UP LIQUOR
PUMP
SODA ASH MAKE-UP
PIMP
LINE REACTOR PUMP
CLARIFIED EFFLUENT
PUMP
MAKE-UP HATER PUMP
MAKE-UP MATER PUMP
ROTARY FILTER
SODA ASH MAKE-UP
RECIRCULATION TANK
LIME REACTOR
THICKENER
SIZE. FEET
IS DIA. X
35 HIGH















MATERIAL
316L SS
C.S.














NO.
1
8
1








1
1
1
1
1
GAS STRCAN NO.
RATE. Ib/hr » 1000
•cf« * 1000
PARTICULARS. Ib/hr
SO;. Ib/hr
UNrtRAIURf. *F
HjO. Ib/hr
0?. I
MO,. Ib/hr
VUOCITT. ft/tec

(Y)

113.4

493.5
550





()P



19.7






@










0 LIQUID STREAM NO.
RATE. Ib/hr x 100
9P"
TOTAL SOLIDS. X
PH
TEMPERATURE. *F
H20. Ib/hr
SULFITE. •)/!
SULFATE. »9/l
CHLORIDE. *g/l
SPECIFIC GRAVITY
^










CJ)










^










^

71








^










^










q)










^










0










^










Ifil










ft










(ft











-------
                    STACK

N>
M
0*
                                                  TO CITY SjjWERS
                                              LANDFILL
Figure 14-33.
Sheller Globe Corp.
Norfolk,  Virginia.
                                                                               EQUIPMENT LIST
EQ NO.
Al
Fl
PI
P2
T1
T2
T3
NAME
ABSORBER
F.D. FAN
RECIRCULATION
PUMP
BLEED-OFF PUMP
RECIRCULATION
TANK
CLARIFIER
REAGENT MAKEUP
TANK
SIZE. FEET
10 DIA. X IS HIGH



20 x 10 x 8 HIGH


MATERIAL
3161 SS
C.S.
BRONZE

C.S.


NO.
1
1


1

1
CAS SIRUM HO.
•ATE. Ib/hr • IUOO
Kim * 1000
PMIKULAKS. Ib/kr
SO?, Ib/kr
I(MȣM!uAC. *f
HjO. Ib/kr
02. *
HO,. Ib/kr
WLOCIIV. ft/tec

(T)










^










^










0 LIQUID SIMM NO.
HATE. Ib/kr » 100
*« '
TOTAL SOLIDS. S
PH
TUVIRATUU. *f
NzO. Ib/kr
SULFIU. >9/I
SULffcte. «g/l
CHLMIOE^Bi/l
SPECIFIC GMVITV
Cp










<$










•(J)










(*)










^










q>










(f>










^










0










•^










^










u>










V











-------
                                                                                                MM.
                                                                KTMW.
                                                                 STUH-
Hl


      XM*A/\/\
                             -frUNMKT TO AINUMCK
                           «
                         sit
         10 IIITLI«
                               MTU
Figure 14-34.    St.  Joe  Zinc  Co.
                        Monaca,  Penhsylvania,
(continued)
                                                                                                m
                                                                                                 M
                                                                                     nn«ii» *»
                                                                                     MM! Ml
                                                                                     MM)
                                                                                                     lOUKIHCfCU
                                                                                                     no cmm stuniti
                                                                                                     UUMIUMTW
                                                                                                     IM Muirmiwr
                                                                                                     no ctnm
                                                                                                     MUIIIB NM>
                                                                                                     snu
                                                                                                     itsuni
                                                                                                     Mm wcimuMi
                                                                                                     •ucra
                                                                                                     Mm wciriuiHi
                                                                                                     (ITMRnWVMB
                                                                                                     cnmuna
                                                                                                     out urn
                                                                                                                      sin. nn
                                                                                                  M I.*. • M MM
                                                                                                  IM.OOO wn. IMO »
                                                                                                  HI ni. i
                                                                                                  i« 0*. » m. i ir
                                                                                                  «M> M. luni. tMI
                                                                                                  ll»n>
                                                                                          M CM. M Ml. M »

                                                                                          MSM. U»ni. J»»
                                                                                                  «»

                                                                                                  it cm. n PSI. ».i v
                                                                                                  M ««. » KI. ) »
                                                                                                  4.IM SWM. «f-USY

                                                                                                  M l.t. • IN MM
                                                                                                  It 1.1. I M MM

                                                                                                  MM I.I. I M.CIMM.

                                                                                                  If.D 1.1. I W.M MM,
                                                                                                  is 1.1. • n
                                                                                                  M.MW
                                                                                                  Ml.*. IIS
                                                                                                                  • moMrr

                                                                                                                  St l.». • M MS*
                                                                                                                  M.N»M. •
                                                                                                                  S I A I >.« M
                                                                                                  M
                                                                                                  MM*. I«
                                                                                                                  C.S.
                                                                                                          •anun
                                                                                                          MMO
                                                                                                          CIST I
                                                                                                                                  •snutrc
                                                                                                          MtltUMC
                                                                                                                I
                                                                                                                I

                                                                                                          cinsran.
                                                                                                          CMTsnn
                                                                                                          C.I. SKU.
                                                                                                          MtTIUOlM
                                                                                                          c-p»
                                                                                                          C.S..
                                                                                                          t.ua
                                                                                                          I.J..
                                                                                                                                  C.S..
                                                                                                                                  UM*
                                                                                                                                  t.s..
                                                                                                                                  tua
                                                                                                                                  c.s..
                                                                                                                  c.s.. i/r
                                                                                                                  MH
                                                                                                                  C.S.

                                                                                                                  MI
                                                                                                                 c.s.
                                                                                                                 nan as. «c»

-------
6AS STRUM NO.
KATE. Ib/br * 1000
•eta x 1000
PARTICULATES, Ib/kr
SO?. Ib/br
TEMPERATURE. *F
H20. Ib/hr
02. »
HO*. Ib/kr
VELOCITY. ft/MC


LiqUlO STRUM HO.
M1E. Ib/kr n 100
V*
TOTAL SOLIDS. X
*
TfMKMTURC. *F
NJO. Ib/kr
SULFITE. «9/l
SU.FAU. «9/l
CM.OK1DE. ag/1
SHCIFIC UMKITf
fj)

234


300






0)










(?)

ISC


120






o










$











$

1300


131





0 LIQUID ST«AH NO.
RATE. Ib/kr * 100
tt»
TOTAL SOLIDS. S
*
TEMPERATURE. *F
HjO. Ib/kr
SULFITE. B9/1
SULFATE. ag/l
CHLORIDE. «9/l
SPECIFIC CMVITV
($




120






ID

1300


131





®










o










<8>










@

130
10







C')











@

«4


131





(jj)











®

130


2«n





$

1CAOO


112





$

100









a




2*0





6
12. t
$l»








^











$

IS




















ID










^



4.S







^










0

4200

4.S
123






®










0



4.S







d










$











0











-------
VO
                      STl
       FLUE GAS IN-
              
                              -SPENT SOLUTION
                               TO DISPOSAL
Figure 14-35.   Sun  Production  Company,
                  Oildale,  California;
                  Fellows,  California.
                                                                                   EQUIPMENT LIST
EQ. NO.
Al
ME!
PI
P2
P3
ST1
Tl
NAME
ABSORBER
HIST ELIMINATOR
CIRCULATION PUMP
CIRCULATION PUMP
CAUSTIC PUMP
STUB STACK
CAUSTIC TANK
SIZE. FEET
4.6 DIA. X 35 HIGH






MATERIAL
316L SS
INCOLOY 825
31 6L SS
31 6L SS
CS
31 6L SS
CS
NO.
1
1
1
1
1
1
1
GAS STREAM NO.
RATE. Ib/hr x 1000
tcfm x 1000
PARTICULATES. Ib/hr
SO?, Ib/hr
TEMPERATURE, 'f
H20. Ib/hr
02. %
NQx. Ib/hr
VELOCITY, ft/sec

(?)

12



50
570



^ O fy (8> O O


-------
                                                   MAKE-UP ,  ,  SOOIUN
                                                    HATER     CARBONATE
                                              ©
to
K)
O
J
FLUE 
GAS
IN




<3>



A
\/
faA_
1 T3 1



J 	 J 	 ig
/ ^ f rrr f til rf f f ' t t f rf fl
J
1 Al
ol

1.


ff T2





\



^) ( 	 .

_O^ Tl

®






\ ^
V"® ^xTO STACK

/ M
f rt






Ofro ~T^-^
f HASTE
DISPOSAL






Figure 14-36. Texaco Inc


California



. , San Ardo>
•
Ducon Company
EQNO.

Al
Fl

ME1

PI

P2

Tl

T2

T3

VI
NAME

ABSORBER
1.0. FAN

MIST ELIMINATOR

RECIRCULATION
PUMP
RECIRCULATION
PUMP
ABSORBER
RECYCLE TANK
VENTURI
RECYCLE TANK

CARBONATE
MIX TANK
VENTURI
SIZE. FEET

30 X 20 X 11 LONG
200 HP




40 HP, 1200 GPM

40 HP, 800 GPM






9 LONG
MATERIAL

FIBERGLASS St
C.S.. PHENOL!
COATED



C.S.. RUBBER-

.5., RUBBER-

FRP
FRP


C.S.
INCONEL 62S



GAS STREAM NO.
MATE. Ib/hr * 1000
•eta x 1000
PARTICIPATES. Ib/hr
SOz. Ib/hr
TEHPEMTUM. T
HzO. Ib/hr
02. X
NOk. Ib/hr
UIOCITT. ft/stc

(T)

117


600





(p

TO


1(0





(D










(T)










LIQUID STREAM NO.
RATE. Ib/hr i 100
9P"
TOTAL SOLIDS. I
pH
TEMPERATURE. T
HjO. Ib/hr
SULFITE. ng/1
SULFATE. ng/1
CHLORIDE. -9/1
SPECIFIC GRAVITY
cp










(§)










(j)










d)










OP










^










^

1200








<^










Ifi)

800








IB










031










^










^











-------
                                   |N,OH SOLUTION
 FLUE GAS IN  










d?i










<0i











-------
       FUiCtt H
         —£
                                         TBMSTE
            Figure 14-38.   Texasgulf,
               Granger, Wyoming.
                                                                         EQUIPMENT LIST
EQNO.
A1
n
Ml
NCI
PI
Ql
Tl
n
n
NAME
ABSORBER
F.O. FAN
REHEATER
NIST
ELIMINATOR
RECIRCULATION
MNP
QUENCHER
LIQUOR HEAD
TMK
RECIRCULATION
TANK
HEAD TANK
SIZE. FEET
IS DIA. X 20.5 HIGH


.8 HIGH
2400 SW. 30 HP
7.2 DIA.

8 DIA. I 10 HIGH

MATERIAL
FLAKED GLASS LINED C.S.
INCONEL 625 TRAYS
C.S.

TEFLON
RUBBER LINED C.S.
INCONELttS

FRP

NO.
2
2
2
2
4
2
2
2
2
to
to
to
MS STREAM M.
MK, Ib/fcr I 1000
Kta I 1000
rMHCUUHS. Ib/hr
SO?. Ib/hr
TEMPERATURE, 'f
H20, Ib/hr
02. I
Mb. Ib/hr
VCLOCITI. ft/MC

LIQUID STUM HO.

»•
IOTM. SOLIDS. S
»«
ICNPtRAIUU. *F
NjO. Ib/hr
SULflTE. ag/l
SULF«K. «j/l
CMLMIOC. ag/l
snciric CMvnr
©

ISt.l


3SO





^

100








$

121. t


120





4*

IS








®










&










CD










ID

60-tl








LIQUID


-------
                                                                            STATUS TO APRIL  1979
                                           SECTION IS

                       FUEL SULFUR CONTENT OF INDUSTRIAL BOILER F6D SYSTEMS
COMPANY
LOCATION
CAPACITY (SCFH)
SULFUR
CONTENT
STATUS
PROCESS
VENDOR
NUMBER
OF FGO
SYSTEMS
NUMBER
OF BOILERS
CONTROLLED
COAL (LESS THAN IX SULFUR)
CANTON TEXTILES                   ,8X
CANTON, GEORGIA
25.000

GENERAL MOTORS CORPORATION        .71 - 2.OX
DAYTON, OHIO
36,000

GENERAL MOTORS CORPORATION        .84*
PONTIAC. MICHIGAN
107,300

HARRIS MINING CO.                 .8X
SPRUCE PINE, NORTH CAROLINA
4,000

TEXASGULF                         .75X
GRANGER, WYOMING
140,000
OPERATIONAL
CAUSTIC WASTE STREAM
FMC ENVIRONMENTAL EQUIPMENT

OPERATIONAL
SODIUM HYDROXIDE SCRUBBING
ENTOLETER, INC.

OPERATIONAL
SODIUM HYDROXIDE SCRUBBING
GM ENVIRONMENTAL

INDEFINITELY SHUT DOWN
WATER SCRUBBING (NA,NH3 OPTN.)
W.W. SLY MANUFACTURING CO.

OPERATIONAL
SODIUM CARBONATE SCRUBBING
SWEMCO INC.
COAL (I TO 2X SULFUR)
CELANESE CORPORATION              l.OX - 2.OX
CUMBERLAND, MARYLAND
50,700

DUPONT, INC.                      t.SX
ATHENS, GEORGIA
280,000

FMC (SODA ASH PLANT)              l.OX
GREEN RIVER, WYOMING
446,000

GENERAL MOTORS CORPORATION        1.2X
TONOWANOA, NEW YORK
92,000

MINN-OAK FARMER'S CO-OPERATIVE    i.ox
WAHPETON, NORTH DAKOTA
164,000

NtKUOSA PAPtRS, INC.              l.OX - 1.5X
ASHUOWN, ARKANSAS
211,000

NORTHERN OHIO SUGAR COMPANY       1.2X
FINOLAY, OHIO
65,230

NURIHEHW OHIO SUGAR COMPANY       i.ox
FKEEMONT, OHIO
40,000

PHILLIP MORRIS, INC.              1.4X
CHESTERFIELD, VIRGINIA
39,000

TENNF.Cn OIL CO.                   1.5X
GREEN RIVER, WYOMING
140,000
PLANNED-CONTRACT AWARDED
DRY LIME SCRUBBING
WHEELABRATOR-FftYE/ROCKWELL INT
PLANNED-CONSIDERING 302 CONTROL
DOUBLE ALKALI
VENDOR NOT YET SELECTED
OPERATIONAL
SODIUM CARBONATE SCRUBBING
FMC ENVIRONMENTAL EQUIPMENT

OPERATIONAL
SODIUM HYDROXIDE SCRUBBING
FMC ENVIRONMENTAL EQUIPMENT

OPERATIONAL
AMMONIA SCRUBBING
KOCH ENGINEERING
OPERATIONAL
CAUSTIC SCRUBBING
NEPTUNE AIRPOLi INC.
TERMINATED
SODIUM CARBONATE SCRUBBING
GREAT WESTERN SUGAR
OPERATIONAL
SODIUM HYDROXIDE SCRUBBING
GREAT WESTERN SUGAR
CUNSTKUCTION
SODIUM CARBONATE SCRUBBING
FLAKT, INC.
PLANNED-REQUEST ING/EVALUATING BIOS
SODIUM CARBONATE SCRUBBING
VENDOR NOT YET SELECTED
                                              223

-------
                                                                            STATUS TO APRIL  1979
                                     SECTION IS (CONTINUED)

                       FUEL SULFUR CONTENT OF INDUSTRIAL BOILER FGO SYSTEMS
COMPANY
LOCATION
CAPACITY (SCFM)
SULFUR
CONTENT
STATUS
PROCESS
VENDOR
NUMBER
OF F6D
SYSTEMS
NUMBER
OF BOILERS
CONTROLLED
COAL (a TO 3X SULFUR)
ARCO/POLYMERS, INC.               3.OX
MONACAf PENNSYLVANIA
305,000

SUN6E, INC.                       3.OX
CAIRO, ILLINOIS
44,000

CARBORUNDUM ABRASIVES             2.21
BUFFALO, NEW YORK
30,000

FIRESTONE TIRE AND RUBBER CO.     2.5X - 3.OX
POTTSTOWN, PENNSYLVANIA
0070

GENERAL MOTORS CORPORATION        2.5X
PARMA, OHIO
128,400

ST. JOE ZINC CO.                  Z.5X - 4.5X
MONACA, PENNSYLVANIA
142,000
              CONSTRUCTION
              DOUBLE ALKALI (CONCENTRATED)
              FMC ENVIRONMENTAL EQUIPMENT

              INDEFINITELY SHUT DOhN
              LIME SCRUBBING
              DRAVO CORP./NAT'L LIME ASS'N

              PLANNED-CONTRACT AWARDED
              LIME SCRUBBING
              CARBORUNDUM ENVIR. SYS. LTD.

              OPERATIONAL
              DOUBLE ALKALI (CONCENTRATED)
              FMC ENVIRONMENTAL EQUIPMENT

              OPERATIONAL
              DOUBLE ALKALI (DILUTE)
              GM ENVIRONMENTAL

              CONSTRUCTION
              CITRATE PROCESS
              BUREAU OF MINES
COAL(6REATER THAN 3X SULFUR)
CATERPILLAR TRACTOR CO.
EAST PEORIA, ILLINOIS
210,000

CATERPILLAR TRACTOR CO.
JOLIET, ILLINOIS
67,000

CATERPILLAR TRACTOR CO.
MAPLETON, ILLINOIS
131,000

CATERPILLAR TRACTOR cy.
MAPLETON, ILLINOIS
105,000

CATERPILLAR TRACTOR CO.
NORTON, ILLINOIS
36,000

CATERPILLAR TKACTOR CO.
MOSSVILLE, ILLINOIS
140,000

GENERAL MOTORS CORPORATION
ST. LOUIS, MISSOURI
64,000

GRISSOM AIR FORCE BASE
BUNKER HILL, INDIANA
32,000
3.ex          OPERATIONAL
              DOUBLE ALKALI (CONCENTRATED)
              FMC ENVIRONMENTAL EQUIPMENT

3.2X          OPERATIONAL
              DOUBLE ALKALI (DILUTE)
              ZURN INDUSTRIES

3.2X          OPERATIONAL
              DOUBLE ALKALI (CONCENTRATED)
              FMC ENVIRONMENTAL EQUIPMENT

3.2X          PLANNED-CONTRACT AWARDED
              DOUBLE ALKALI (CONCENTRATED)
              FHC ENVIRONMENTAL EQUIPMENT

3.2X          OPERATIONAL
              DOUBLE ALKALI (DILUTE)
              ?URN INOUSTRIhS

3.2X          OPERATIONAL
              OOIJBLE ALKALI (CONCENTRATED)
              FMC ENVIRONMENTAL EQUIPMENT

3.2X          OPERATIONAL
              SODIUM HYDROXIDE SCRUBBING
              A.O. LITTLE

3.OX • 3.5X   CONSTRUCTION
              DOUBLE ALKALI (CONCENTRATED)
              NEPTUNE AIRPOL, INC.
                                              224

-------
                                                                            STATUS TO APRIL  1979
                                     SECTION 15 (CONTINUED)

                       FUEL SULFUR CONTENT OF INDUSTRIAL BOILER FGD SYSTEMS
COMPANY
LOCATION
CAPACITY (SCFM)
                                   SULFUR
                                   CONTENT
STATUS
PROCESS
VENDOR
NUMBER      NUMBER
OF FGD    OF BOILERS
SYSTEMS   CONTROLLED
COAL(6REATEK THAN 3X SULFUR)
PFIZER, INC.                      3.51
EAST ST. LOUIS, ILLINOIS
40,000

RICKENBACKER AIR FORCE BASE       s.fcx
COLUMBUS, OHIO
55,000

WESTERN CORRECTIONAL INST.        3.5*
PITTSBURGH, PENNSYLVANIA
10,000
                                                OPERATIONAL
                                                LIME SCRUBBING
                                                IN-HOUSE DESIGN

                                                OPERATIONAL
                                                LIMESTONE SCRUBBING
                                                RESEARCH-COTTRELL/BAHCO

                                                PLANNED-CONTRACT AWARDED
                                                SULF-X SCORE PROCESS
                                                PITTSBURGH ENV.SENGY. SYSTEMS
OIL (LESS THAN IX SULFUR)
ALYESKA PIPELINE SERVICE co.      .03* - .ix
VALOEZ, ALASKA
50,000

SHELLER GLOBE CORP.               <1.0t
NORFOLK, VIRGINIA
8,000
                                                OPERATIONAL
                                                SODIUM HYDROXIDE SCRUBBING
                                                FMC ENVIRONMENTAL EQUIPMENT

                                                INDEFINITELY SHUT OOMN
                                                SODIUM HYDROXIDE SCRUBBING
                                                N.N. SLY MANUFACTURING CO.
OIL (1 TO
             SULFUR)
BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA
18,000

BELRIDGE OIL CO.
MCKITTRICK, CALIFORNIA
12,000

BELRIOGE OIL CO.
MCKITTRICK, CALIFORNIA
12,000

CHEVRON U.S.A.  INC.
BAKERSFIELD, CALIFORNIA
248,000

CHEVRON U.S.A.  INC.
BAKERSFIELD, CALIFORNIA
146,000

DOUBLE BARREL  OIL  CO.
8AKERSFIELO, CALIFORNIA
12,000

BETTY OIL  COMPANY
BAKERSFIELO, CALIFORNIA
891,000

SETTY OIL  COMPANY
BAKERSFIELD, CALIFORNIA
72,000

"EAO PAPERBOARD CO.
1TEVENSON,  ALABAMA
100,000
                                  1.1*          OPERATIONAL
                                                SODIUM HYDROXIDE SCRUBBING
                                                HEATER TECHNOLOGY

                                  1.1*          OPERATIONAL
                                                SODIUM HYDROXIDE SCRUBBING
                                                C-E NATCO

                                  I.IX          OPERATIONAL
                                                SODIUM HYDROXIDE SCRUBBING
                                                THERMOTICS INC.

                                  1.1*          OPERATIONAL
                                                SODIUM CARBONATE SCRUBBING
                                                KOCH ENGINEERING

                                  1.1X          CONSTRUCTION
                                                SODIUM CARBONATE SCRUBBING
                                                KOCH ENGINEERING

                                  1.1X          OPERATIONAL
                                                SODIUM HYDROXIDE SCRUBBING
                                                C-E NATCO

                                  1.1X          OPERATIONAL
                                                SODIUM CARBONATE SCRUBBING
                                                IN-HOUSE DESIGN

                                  1.1X          OPERATIONAL
                                                SODIUM CARBONATE SCRUBBING
                                                FMC ENVIRONMENTAL EQUIPMENT

                                  1.5* - 3.0*   OPERATIONAL
                                                SODIUM CARBONATE SCRUBBING
                                                NEPTUNE AIRPOL,  INC.
                                              12
                                              61
                                               225

-------
                                                                            STATUS TO APRIL  1979
                                     SECTION 15 (CONTINUED)

                       FUEL SULFUR CONTENT OF INDUSTRIAL BOILER FGD SYSTEMS
COMPANY
LOCATION
CAPACITY (SCFH)
OIL (1 TO 2X SULFUR)
MOBIL OIL COMPANY
BUTTONMILLOM* CALIFORNIA
80,500
SANTA FE ENERGY CORP.
BAKER3FIELD, CALIFORNIA
70*000
SHELL OIL COMPANY
BAKERSFIELOr CALIFORNIA
99,000
SHELL OIL COMPANY
TAFTi CALIFORNIA
25
-------
                                                                            3TATU3 TO APRIL

                                     SECTION 15 (CONTINUED)

                       FUEL SULFUK CONTENT OF INDUSTRIAL BOILER FGD SYSTEMS



COMPANY                                         STATUS                           NUMBER      NUMBER
LOCATION                           SULFUR       PROCESS                          OF FGO    OF BOILERS
CAPACITY (SCFM)                    CONTENT      VENDOR                           SYSTEMS   CONTROLLED


MIXTURE OF FUELS (2 TO JX SULFUR)


ITT RAYONIER, INC.                i.OX • 2.5X   OPERATIONAL                         2          4
FERNANDINA BEACH, FLORIDA                       SODIUM HYDROXIDE SCRUBBING
176,000                                         NEPTUNE AIRPOL. INC.


MIXTURE OF FUELS (GREATER THAN 3X SULFUR)


INLAND CONTAINER CORPORATION      <3,OX         CONSTRUCTION                        1          1
MEM JOHNSONVILLE, TENNESSEE                     AMMONIA SCRUBBING
154,000                                         NEPTUNE AIRPOL INC.
                                               227

-------
                                TECHNICAL REPORT DATA
                         (Please read Instructions on the reverse before completing)
1. REPORT NO. ,
EPA-600/7-79-067b
                           2.
                                                      3. RECIPIENT'S ACCESSION-NO.
4. TITLE AND SUBTITLE
 EPA INDUSTRIAL BOILER FGD SURVEY: First
   Quarter 1979
                                                     6. REPORT DATE
                                                      April 1979
                                                     6. PERFORMING ORGANIZATION CODE
7. AUTHORIS)
           ^ TutUe ^ A Patkar f s t Kothar i , D. Osterhout ,
 M.Heffling, and M. Eckstein
                                                      8. PERFORMING ORGANIZATION REPORT NO.
9. PERFORMING ORGANIZATION NAME AND ADDRESS
 PEDCo Environmental, Inc.
 11499 Chester Road
 Cincinnati, OH 45246
                                                      10. PROGRAM ELEMENT NO.
                                                      EHE624
                                                     11. CONTRACT/GRANT NO.

                                                     68-02-2603, Task 45
12. SPONSORING AGENCY NAME AND ADDRESS
 EPA, Office of Research and Development
 Industrial Environmental Research Laboratory
 Research Triangle Park, NC  27711
                                                     13. TYPE OF REPORT AND PERIOD COVERED
                                                     Task Final; 1-3/79	
                                                     14. SPONSORING AGENCY CODE
                                                       EPA/600/13
is. SUPPLEMENTARY NOTES ffiRL-RTP project officer R. M.  McAdams is no longer with EPA;
for .details contact II. Dt Stern, MD-61, 919/541-2915.  Earlier related reports are
                7Wl> AV« A^« k^bWA AA • JLTJ
	7-78-052 series.
 s. ABSTRACT
              rep0rt gives detailed technical information concerning application of
 flue gas desulfurization (FGD) systems to Indus trial boilers. Design and operation
 data is presented for 164 FGD control systems (125 of them operational), designed to
 control SO2 emissions from 304 industrial boilers at 58 plants. With a 1978 capacity
 of 8. 8 million scfm, an average of more than seven new FGD systems have been put
 on line each year since 1972. Information in the report was obtained by a survey of
 plant personnel, control system vendors, regulatory agencies, and consulting engin-
 eering firms . The data is given in two types of tables : one gives summary informa-
 tion; the other, detailed information. Summary tables present information as a func-
 tion of control process , control system vendor , disposal technique , operational sta-
 tus, startup date, and flue gas  capacity. Detailed information includes:  control sys-
 tem design,  economics, operating experience, problems and solutions, waste dis-
 posal techniques, and maintenance practices.
17.
                             KEY WORDS AND DOCUMENT ANALYSIS
                DESCRIPTORS
                                          b.lDENTIFIERS/OPEN ENDED TERMS
                                                                  c. COSATI Field/Group
 Pollution
 Flue Gases
 Desulfurization
 Boilers
 Waste Disposal
 Maintenance
                      Pulping
                      Chemical Industry
Pollution Control
Stationary Sources
Industrial Boilers
13B
21B
07A,07D
13A
15E
11H
18. DISTRIBUTION STATEMENT

 Unlimited
                                         19. SECURITY CLASS (ThisReport)
                                          Unclassified
                         21. NO. OF PAGES
                             236
                                         20. SECURITY CLASS (Thispage)
                                          Unclassified
                                                                  22. PRICE
EPA Form 2220-1 (9-73)
                                        228
                                   . GOVERNMENT PRINTING OFFICE:! 9 79 -6kQ -013/ k2kO REGIONNO.4

-------