         TECHNOLOGY SUPPORT CENTER FOR
             MONITORING AND SITE
              CHARACTERIZATION
          FY96 FIRST QUARTERLY REPORT
            OCTOBER-DECEMBER 1995
                 December 30, 1995

-------
 Superfund/RCRA
 Technology Support
 Project
           CRD-LV
TECHNOLOGY SUPPORT CENTER FOR
     MONITORING AND SITE
      CHARACTERIZATION
  FY96 FIRST QUARTERLY REPORT
    OCTOBER-DECEMBER 1995
          December 30, 1995

-------
                                      TABLE OF CONTENTS

                                       (Indexed by Site Name)

SUPERFUND  	1
    REGION 1  	1
                                                  Grace, W.R. SF Site	1
                                                  Norwood SF Site 	1
                                                  O'Connor, F. SF Site 	2
                                                  Ottati & Goss/Kingston Steel Drum S.F. Site	3
                                                  Pine Street Canal SF Site 	3
                                                  Western Sand & Gravel SF Site	4
    REGION 2  	5
                                                  Diamond Alkali SF Site	5
                                                  Warwick Landfill SF Site	5
    REGION 3  	6
                                                  Aberdeen Proving Ground SF Site	6
                                                  Chem-Solv SF Site	6
                                                  Elrama School SF Site 	7
                                                  Fort George Meade SF Site 	8
                                                  METCOA Superfund Site	8
                                                  Naval Air Warfare SF Site	9
                                                  Naval Ships Control Center SF Site	9
                                                  Navy Training Center-Bainbridge SF Site
                                                            	10
                                                  Philadelphia Naval Complex (PNC) SF Site  	10
                                                  Saegertown Industrial Area SF Site 	11
    REGION 4  	12
                                                  Aberdeen Pesticide Area SF Site  	12
                                                  Marzone Inc. SF Site 	12
    REGION 5  	13
                                                  Allied Chemical/Ironton Coke SF Site	13
                                                  Byron Salvage SF Site 	13
                                                  Site: Lorain County  SF Site:  	14
                                                  Ottawa S.F. Site 	14
                                                  Petoskey Municipal SF Site	15
    REGION 6  	15
                                                  South Cavalcade SF Site	15
    REGION 7  	16
                                                  Cherokee SF Site 	16
                                                  Oronogo-Duenweg SF Site	16
    REGION 8  	17
    REGION 9  	17
                                                  Allied Signal SF Site 	17
                                                  Concord Naval SF Site	18
                                                  Hawker Pacific SF Site	19
                                                  Luke AFB SF Site	19
                                                  Marine Corps Air Station Yuma SF Site  	20
                                                  Modesto SF Site	20
                                                  San Fernando SF Site	21
    REGION 10  	22
                                                  Bunker Hill SF Site	22

-------
SUPERFUND SHORT-TERM REQUESTS	23
                                             Short Term Requests  	23

RCRA CORRECTIVE ACTION	25
   REGION 1  	25
   REGION 5  	25
                                             Columbus Waste-To-Energy RCRA Facility	25
   REGION 8  	25
                                             EXXON Refinery RCRA Facility	25
   REGION 9  	:	26
                                             Greenfield Environmental of Arizona RCRA Facility .. 26
   REGION 10 	27
                                             Georgetown RCRA Facility	27

RCRA SHORT TERM REQUEST 	28
                                             Short Term RCRA Technical Support 	28

SUPERFUND REMOTE SENSING SHORT TERM REQUEST  	29
                                             Superfund Short Term Remote Sensing Technical Support
                                                      	29

RCRA REMOTE SENSING SHORT TERM REQUEST	30
                                             RCRA Short Term Remote Sensing Technical Support
                                                      	30

ISSUE PAPER	31
                                             Identifying Background  	31
ISSUE PAPER	32
                                             Explosives in Soil    	32

COORDINATION	33
                                             Superrund Coordination	33
                                             RCRA Coordination	33

TECHNOLOGY TRANSFER	34
                                             Superrund Technology Transfer	34
                                            111

-------
                                             SUPERFUND

REGION 1

•   Project Name: W.R. Grace Superfund Site
    Site: Grace, W.R. SF Site
    Site ID:                                                   Job Order No: 226 10106

    Type-Lead:
    Requested by: Lynn Jennings (617) 573-9634
    Lead Scientist: A.K. Singh (702) 435-3731

    Start Date: May 1995
    Expected Completion Date: September 1995
    Revised Completion Date: March 1996

    Estimated Budget: $5,000                                   Total Expenditures: $3,988
    Revised Budget: $                                         Total FY96 Expenditures: $0
    Major Contaminants: Organics                               Total 1st Qtr. Expenditures: $0

    The Region I Remedial Project Manager (RPM) requested that the Characterization Research Division  Las Vegas
    (CRD-LV), Technology Support Center (TSC) examine the use of a formula for an upper one-sided lOO(l-a)
    percent confidence limit, for assessing site sampling/monitoring data. Three data sets were sent to the TSC for
    assessment. The following statistical tests were performed on the data sets:

    •   Summary statistics and sample histograms of concentration data and log-transformed concentration data were
        computed using the software package GEO-EAS.

    •   Kolmogorov-Smirnov test was used to test normality and log-normality of the data using the software package
        SCOUT.

    •   Tests for outliers were performed on the data using the Software SCOUT.

    A report that provided the statistical assessment and recommendations titled "Statistical Analysis of Battery
    Separation Lagoon Post Excavation  Sampling Data for W.R. Grace Superfund Site" was provided to the RPM.
    Additional review of site documents is recommended.
    Project Name: Norwood Superfund Site
    Site: Norwood SF Site
    Site ID:                                                   Job Order:

    Type Lead:
    Requested by: Anne Marie Burke: (617) 223-5528
    Lead Scientist: A.K. Singh (702)435-3731

    Start Date: December 1995
    Expected Completion Date: April 1996
    Revised Completion Date:

-------
Estimated Budget: $6,000                                     Total Expenditures: $3,600
Revised Budget: $                                            Total FY96 Expenditures: $3,600
Major Contaminants: Organics                                 Total 1st. Qtr. Expenditures: $3,600


The Regional Remedial Project Manager (RPM) requested that the CRD-LV, TSC evaluate the statistical analysis
performed by Cambridge Environmental Inc. for the Norwood site.  The hard copy of the data was provided. The
data included five contaminants of concern (Benzo(a)-pyrene, Benzo (a)-anthracene, Benzo(b)-fluoranthene,
Benzo(k)-fluoranthene ,and Chrysene from six (6) areas. The TSC examined the available data and provided a
report titled "Statistical Analysis of Data from the Norwood PCD site, MA. Additional assessments of site data are
anticipated.
Project Name: F .O'Connor Company
Site: O'Connor, F. SF Site
Site ID:                                                     Job Order: 22401109

Type-Lead:
Requested by: Ross Gilleland (617) 573-9662
Lead Scientist: A.K. Singh (702) 435-3731

Start Date: February 1995
Expected Completion Date: September 1995
Revised Completion Date: February 1996

Estimated Budget: $10,000                                    Total Expenditures: $ 6,480
Revised Budget: $                                            Total FY96 Expenditures: $ 0
Major Contaminants: PCBs                                   Total 1st Qtr. Expenditures: $ 0


A geostatistical analysis of the distribution of soil contaminated with polychlorinated biphenyls (PCBs) was
conducted to develop the sampling plan for the F. O'Connor Superfund Site in Augusta, Maine. The analysis was
designed to support attainment of target cleanup goals as specified in the U.S. Environmental Protection Agency
(EPA) Record of Decision (ROD) for the Site. Over 450 soil samples  were collected during Remedial
Investigation and pre-design phases of the study. Chemical analysis of these samples were performed for PCBs
using both laboratory and field screening methods.  Samples were initially collected at grid locations, while
subsequent samples were collected to define areas of higher concentrations and to determine the clean boundaries
of the site.

Analysis of the comprehensive data set as well as data subsets indicated a log-normal distribution of the data. Data
subsets were developed based on knowledge of waste disposal and contaminant distributions. Variogram analysis
was conducted using indicator parameters corresponding to the ROD specified threshold limits of 1 and lOppm
PCBs.

The RPM has requested that the CRD-LV TSC evaluate the geostatistical model used by the PRP, the use of the
geometric mean to establish compliance with the cleanup criteria, and to comment on the use of composite
samples. CRD-LV personnel reviewed the provided data and submitted an initial response. Additional reviews of
the  utilized statistical procedures are in process.

Following the review and acceptance of the Work Plan, providing on-site oversight and field  audit for the
"Preliminary Soil/Sediment Screening/Sampling" of the Phase IARI activities conducted by the PRPs was
required. Field audit oversight included observing and documenting the field activities, and analyzing split
samples using fix-lab analysis. Reviews of site documents were completed. Split samples were collected and sent

-------
to CRD-LV for analysis.  The analysis was completed during this quarter. In addition, a field on-site audit was
completed. The results of the audit with suggestions and recommendations were sent to the RPM. The initial draft
of the data validation report was provided to the RPM. Additional technical support is anticipated.
Project Name:  Ottati & Goss
Site: Ottati & Goss/Kingston Steel Drum S.F. Site
Site ID:                                                    Job Order No: 207 S1170

Type-Lead:
Requested by: Richard Goehlert (617) 573-5742
Lead Scientist: Mark Silverstein (702) 897-3291

Start Date: October 1995
Expected Completion Date: March 1996
Revised Completion Date:

Estimated Budget: $6,000                                    Total Expenditures: $3,345.
Revised Budget: $                                           Total FY96 Expenditures: $3,345.
Major Contaminants: PCBs, Pesticides                         Total 1st Qtr. Expenditures: $3,345.

The Regions Remedial Project Manager (RPM) requested that the Characterization Research Division Las Vegas
(CRD-LV), Technology Support Center (TSC) provide assistance in field measurements and monitoring design.
The site is in design and of particular concern is the potential remediation of a wetland area contaminated with
PCBs and pesticides. The Eco risk has been completed in draft form. There is still some work to be done to
complete the Eco risk. The remaining work is dependent upon knowing, or being able to extrapolate from existing
data, the PCB concentrations in the area of the wetland that has not been characterized.  It has been determined that
the extrapolation is not possible with remaining wetland has been decided upon.  It has been decided to use field
analysis methods (Immunoassay) to determine the extent of contamination and to complete the Eco Risk.

The TSC provided an assessment of available data and suggested a possible design approach. The RPM decided to
utilize another approach for measuring PCBs. As such, the involvement of the TSC may be limited.

Project Name:Pine Street Canal
Site: Pine Street Canal SF Site
Site ID:01NHG1                                            Job Order No: 224 10196

Type-Lead:
Requested by: Ross Gilleland  (617) 573-5766
Lead Scientist: Mark Silverstein (702) 897-3291/D. Jackson (702)

Start Date: July 1994
Expected Completion Date: March 1996
Revised Completion Date:

Estimated Budget: $25,000                                   Total Expenditures:  $59,454 PC&B $2,400.
Revised Budget: $40,000                                    Total FY96 Expenditures: $0 PC&B   $ 500
Major Contaminants: PAHs                                  Total 1st Qtr. Expenditures: $0 PC&B  $500

The Region 1 Project Officer requested that approaches be examined to determine whether the Pine Street Canal
site characterization techniques are addressed sufficiently. A sampling/monitoring approach for confirming the
vertical and lateral extent of soil/sediment contamination, procedures for identifying levels of soil/sediment

-------
contamination, procedures for identifying levels of soil, sediment and possible water contamination, the quality
assurance/quality control (QA/QC) plan, the S&A plan and all other methods being proposed to fully characterize
the site for remedial purposes. In addition, an assessment of data needs necessary to satisfy the characterization
objectives was required. This data assessment involved data interpretation and recommendations involving
statistical and other tests necessary for making decisions concerning the extent of site contaminants.

To characterize site contaminants, the selection of an appropriate immunoassay kit was an important factor in
successfully completing the site characterization objectives. Addressing this effort required CRD-LV scientists(s)
to identify critical elements that must be implemented by the PRPs to validate the immunoassay technology. In
addition, TSC scientist(s) will be required to assess the validation process/procedures and the data obtained.

Following the review and acceptance of the Work Plan, providing on-site oversight and field audit for the
"Preliminary Soil/Sediment Screening/Sampling" of the Phase IARI activities conducted by the PRPs was
required.  Field audit oversight included observing and documenting the field activities, and analyzing split
samples using fix-lab analysis. Numerous reviews of site documents were completed. Split samples were collected
and sent to CRD-LV for analysis. The analysis was completed.  In addition, a field on-site audit was completed.
The results of the audit with suggestions and recommendations were sent to the RPM. The initial draft of the data
validation report was provided to the RPM. The CRD-LV TSC provided additional recommendations and
comments pertaining to the data validation report.  Additional data assessment may be required.


Project Name: Western Sand & Gravel Data Review
Site: Western Sand & Gravel SF Site
Site ID:                                                     Job Order No: 226 10106

Type-Lead:
Requested by: Al Klinger (617) 573-9662
Lead Scientist: A.K. Singh (702) 435-3731

Start Date: June 1995
Expected Completion Date: September  1995
Revised Completion Date: March 1996

Estimated Budget: $5,000                                     Total Expenditures: $1,424
Revised Budget: $                                            Total FY96 Expenditures: $0
Major Contaminants: Organics                                 Total 1st Qtr. Expenditures: $0

A number of years ago, the CRD-LV TSC provided statistical support to the RPM pertaining to the Wilcoxen Test
to compare theoretical verses observed data. This effort was in support of completing the ROD. Relative to the
Wilcoxen Test,  the RPM provided the TSC with some site data (benzene levels in groundwater) for assessing
"Outliers". The TSC provided the RPM with an assessment of the data that included:

•  An assessment pertaining to the normal data distribution,  and

•  Statistical tests for Outliers using the following two options: (a) classical, and (b) Huber's Robust Procedure.
In addition to the statistical assessment, recommendations and conclusions pertaining to the data analysis were
provided.  Additional reviews of site documents is anticipated.

-------
REGION 2

•   Project Name:Diamond Alkali
    Site: Diamond Alkali SF Site
    Site ID:
    Type-Lead: Fund
    Requested by: Lance Richman (214) 264-6695
    Lead Scientist: A.K. Singh (702)435-3731, J.R. Donnelly

    Start Date: July 1993
    Expected Completion Date:  February 1994
    Revised Completion Date: April  1996

    Estimated Budget: $30,000
    Revised Budget: $
    Major Contaminants: Organics, PCBs
Job Order: 224 10179
Total Expenditures: $27,607,     PC&B $800
Total FY96 Expenditures: $ 100   PC&B $300
Total 1st Qtr. Expenditures: $100 PC&B $300
    The RPM requested that the TSC provide a quality assurance and RI review. In addition, a review of the suggested
    monitoring design approach was requested. CRD-LV provided a report that addressed QA aspects and provided a
    number of suggestions that would enhance the identity of the geographical distribution of PCBs in sediments in the
    Passaic River. CRD-LV has assisted the RPM in negotiations with the PRPs and assisted in the development of a
    definitive monitoring design approach. CRD-LV scientists received the final S&A Plan developed by the PRPs.
    Comments and suggestions pertaining to the final S&A Plan were provided to the RPM. Recommendations and
    comments pertaining to suggested statistical tests were provided to  the RPM. A request to assess available dioxin
    analytical methods was received. Recommended analytical procedures were provided to the Region. The CRD-
    LV TSC provided additional dioxin analysis recommendations to the RPM. The RPM and TSC personnel are in
    the process of writing a paper describing the monitoring design approach.
    Project Name: Warwick Landfill
    Site: Warwick Landfill SF Site
    Site ID: NYD980506679

    Type-Lead: Remedial
    Requested by: Damion Duda (212) 264-9589
    Lead Scientist: Steve Pyle (702) 798-2529

    Start Date: January 1994
    Expected Completion Date: September 1993
    Revised Completion Date: January 1996

    Estimated Budget: $10,000
    Revised Budget: $
    Major Contaminants: Organics
Job Order No: 226-10106
Total Expenditures: $ 6,149,   PC&B $6,100
Total FY96 Expenditures: $ 0
Total 1st Qtr. Expenditures: $ 0
    The RPM requested that CRD-LV provide technical assistance in finding an analytical method to analyze
    cellosolves in environmental samples.  The CRD-LV ASB tested the feasibility of using a quick-turn-around
    method using direct aqueous injection (DAI) by analyzing five test compounds. The results of these tests were
    provided to the RPM.  The TSC has requested from the RPM samples from the site be sent to CRD-LV to
    definitively test the DAI method. The Region sent samples to CRD-LV for analysis. The samples were analyzed,
    and a report titled, "Report on Warwick Sample Analysis Using Direct Aqueous Injection GC/MS Methodology"
    was sent to the RPM. The RPM requested additional explanation of the reported results. Additional explanations
    of the provided data may be requested.

-------
REGION 3

•   Project Name:  Aberdeen Proving Grounds
    Site: Aberdeen Proving Ground SF Site
    Site ID:                                                     Job Order No: 226-01115

    Type-Lead: Remedial
    Requested by:  Dawn loven (215) 597-1309
    Lead Scientist: A.K. Singh (702) 435-3731

    Start Date: July 1995
    Expected Completion Date: September 1995
    Revised Completion Date: September 1996

    Estimated Budget: $20.000                                    Total Expenditures: $ 7,570
    Revised Budget: $                                           Total FY96 Expenditures: $0
    Major Contaminants: Organics                                Total 1st Qtr. Expenditures: $0

    The Aberdeen Proving Ground(APG) occupies 79,000 acres of land and water near the head of the Chesapeake
    Bay. The APG consists of two areas that are listed separately on the NPL: the Edgewood area and the
    Michaelsville area.  The Edgewood area is 13,000 acres and includes Gunpowder Neck, Pooles Island, Carroll
    Island, and Graces Quarters.

    Preliminary on-site groundwater sampling has identified various metals, phosphorus, and volatile organic
    compounds (VOCs) including chloroform and benzene. Preliminary on-site soil contamination sampling has
    identified various VOCs, metals, and unexploded ordnance in surface and subsurface soil.

    To address some risk assessment issues, the  RPM requested that the CRD-LV TSC review the report, "Installation
    Restoration Program Carroll Island/Graces Quarters, Aberdeen Proving Ground Risk Assessment Framework,
    Draft, May 1995." Based upon the data in the report, the RPM requested that the CRD-LV TSC address the
    following questions:

    •   Is it appropriate to use non-parametric methods to determine site-wide concentrations when contaminants were
        detected in <50% of samples?

    •   If yes, how should non-detects be handled?

    •   Is it appropriate to use the UTL to define background concentrations in inorganics (for comparison to on-site
        levels)?

    The TSC  provided a report to the RPM that addressed the above three issues. Additional support is anticipated.


•   Project Name:  Chem-Solv Superrund Site
    Site: Chem-Solv SF Site
    Site ID:                                                     Job Order No: 226 10106

    Type-Lead:
    Requested by: Debra Rossi (215) 597-9238
    Lead Scientist: A.K.  Singh (702) 435-3731

-------
Start Date: June 1995
Expected Completion Date: September 1995
Revised Completion Date: February 1996

Estimated Budget: $6,000                                    Total Expenditures: $3,632
Revised Budget: $                                           Total FY96 Expenditures: $0
Major Contaminants: Organics                                Total 1st Qtr. Expenditures: $0

The PRP's developed and have proposed to use a statistical procedure for assessing and identifying trends in
groundwater contaminants at this site. Based on the trends analysis, the PRP's will identify the time period
required to attain and meet the specified cleanup standards.

The RPM requested that the CRD-LV TSC review the proposed procedure and determine if this method would be
acceptable in satisfying the sites cleanup objectives. The TSC assessed the suggested approach and provided the
RPM with comments and suggestions in a report titled, "Some Recommendations for Statistical Analysis of VOC
Concentrations in Groundwater from the Chem-Solv, Inc. Superfund Site." Additional review of site data may be
required.


Project Name:  Elrama School Superfund Site
Site: Elrama School SF Site
Site ID:                                                    Job Order No: 226 10106

Type-Lead: Fund
Requested by:  Glen S. Lapsley (215)597-6684
Lead Scientist: A.K. Singh  (702)435-3731

Start Date: July 1995
Expected Completion Date: September 1995
Revised Completion Date: June 1996

Estimated Budget: $12,000                                   Total Expenditures: $6,466
Revised Budget: $                                           Total FY96 Expenditures: $3,600
Major Contaminants: Lead                                    Total 1st Qtr. Expenditures: $3,600

This site is located in Elrama Township. Washington County, Pennsylvania.  Disposal of waste, including filter
cake residue, solvents, and acid clay catalysts from the production of hydrocarbon resins, has occurred in a ravaine
located on the site.

Currently, the EPA Region  III Removal Enforcement Section is overseeing actions taken at the site by the
Potentially Responsible Party (PRP), in accordance with an EPA Administrative Order.  The PRP has submitted a

The current agreement is that the representative concentration (statistically determined at 95% of the U.C.L. on the
mean) of the chemicals remaining in each excavated area shall meet the target risks specified by the EPA.

The CRD-LV TSC was requested by the OSC to evaluate the statistical tests and procedures that the PRP's have
suggested to use for calculating and identifying soil cleanup concentrations.  The CRD-LV TSC provided a number
of suggestions and recommendations pertaining to the PRP's suggested approaches.  The TSC has provided
additional data assessment and recommendation.

-------
    Project Name: Fort George Meade
    Site: Fort George Meade SF Site
    Site ID:                                                   Job Order No: 224 10106

    Type-Lead:
    Requested by: Drew Lausch (215) 597-3161
    Lead Scientist: A.K. Singh (702) 435-3731

    Start Date: January  1994
    Expected Completion Date: April 1995
    Revised Completion Date: April 1996

    Estimated Budget: $6,000                                    Total Expenditures: $4,785, PC&B $800
    Revised Budget: $                                           Total FY96 Expenditures:   PC&B $800
    Major Contaminants: Inorganics/Organics                      Total 1st. Qtr. Expenditures: PC&B $200

    The objective of this Region III request is to determine the extent of which two completed UXO surveys have
    attained a more stringent detection/removal requirement specified in the DOD-DOI transfer agreement. In order to
    ascertain the effectiveness of the previous UXO surveys, DOD outlined the following technical approach:  (1)
    develop a UXO sampling plan; (2) conduct a UXO survey; (3) perform a statistical analysis on data obtained from
    the UXO survey and (4)  evaluate potential impacts to human health from UXO by employing a probabilistic risk
    assessment. The TSC provided an initial assessment of the past surveys. Based on the TSC comments and
    recommendations, a meeting with the RPM, DOD, and CRD-LV scientist(s) was held at CRD-LV. The TSC is
    involved with the statistical design approach and data assessment. Additional data reviews and data assessments
    may be provided. The RPM is interested in determining if a geostatistical assessment of the monitoring data would
    be beneficial.
•   Project Name: METCOA Radiation Superfund Site
    Site: METCOA Superfund Site
    Site ID:                                                    Job Order No: 226 10106,
                                                              207-S0060.207S1116
    Type-Lead: Fund
    Requested by: Jeffery Dodd (303) 234-0254, Kathleen Root (215) 597-8920
    Lead Scientist: A.K. Singh (702)435-3731

    Start Date: August 1995
    Expected Completion Date: March 1996
    Revised Completion Date:

    Estimated Budget: $20,000                                   Total Expenditures: $17,462
    Revised Budget: $                                          Total FY96 Expenditures: $9,869
    Major Contaminants: Lead                                   Total 1st. Qtr. Expenditures: $9,869

    The Metcoa site located in Pulaski, Pennsylvania is contaminated with a number of inorganic contaminents
    including nickel, cadmium, and thorium. The PRP's at this site have suggested that a "CRG" statistical data
    assessment approach is appropriate to use for determining if soil remedial actions are necessary. The OSC has
    requested that the CRD-LV TSC evaluate the "CRG" approach.  CRD-LV TSC personnel have provided a number
    of assessments of the Metcoa data, provided a preliminary geostatistical analysis, participated in numerous
    conference calls with the Department of Justice, Regional Council, the OSC and the PRP's and has evaluated the
    "CRG" approach. This assessment was submitted to the OSC.

-------
Project Name:  Naval Air Warfare Center (NAWC)
Site: Naval Air Warfare SF Site
Site ID:
Job Order No: 224 01102
Type-Lead:
Requested by: Darius Ostrauskas (215) 597-0549
Lead Scientist: D. Jackson/Glen Carpenter (208) 526-4166

Start Date: November 1994
Expected Completion Date: September 1995
Revised Completion Date: January 1996

Estimated Budget: $10,000
Revised Budget: $
Major Contaminants: Organics
Total Expenditures: $7,200
Total FY96 Expenditures: $0
Total 1st. Qtr. Expenditures: $0
The TSC was requested by the Region III RPM to examine suggested site characterization approaches to determine
if these approaches would be adequate to define the levels and geographical extent of site contaminants.  The initial
effort of this review focused on the following two areas: The first
was to review and comment on the results of the Phase IRI Soil Gas and Geophysical surveys. The second was to
review and comment on the  additional Soil Gas and Geophysical survey work being proposed in the Draft Phase III
work plan. Additional efforts may focus on all suggested sampling/monitoring contamination, procedures for
identifying levels of soil, sediment, and possible water contamination, the quality assurance/quality control
(QA/QC) plan, the S&A plan and all other methods that are being proposed to fully characterize the site for
remedial  purposes. In addition, an assessment of data needs necessary to satisfy the characterization objectives
may be required if past characterization efforts have not adequately characterized the sites contaminants. This data
assessment could involve data interpretation and recommendations involving statistical and other tests necessary
for making decisions concerning the extent of site contaminants.  The design of additional sampling/monitoring
approaches may be required.

The TSC completed a review of the Phase I RI Soil-Gas and Geophysical Survey Report. Comments and
suggestions were provided to the RPM. Additional data assessments and site document reviews may be required.
Project Name: Naval Ships Parts Control Center (SPCC) Superfund Site
Site: Naval Ships Control Center SF Site
Site ID:                                                     Job Order No: 226 10106, 207-S0060

Type-Lead:
Requested by: Andrew Sochanski (215) 597-3167
Lead Scientist: A.K. Singh (702) 435-3731

Start Date: May 1995
Expected Completion Date: September 1995
Revised Completion Date:  March 1996
Estimated Budget: $8,000
Revised Budget: $15,000
Major Contaminants: Dioxins
Total Expenditures: $10,666
Total FY96 Expenditures: $3,300
Total 1st. Qtr. Expenditures: $3,300

-------
The Region III RPM requested technical assistance in developing a monitoring design for sampling a biopile to
determine the levels and distribution of dioxin contamination. The biopile consisting of about 15,000 cubic yards
of contaminated soil excavated from burn pits is six (6) feet deep, 240 feet in width and 390 feet long.

The TSC provided the report titled, "Design for Dioxin Sampling - Navy Ships Parts Control Center, Burn Pits
(Site 3), Mechanicsburg, PA". This report identifies the number of samples required to characterize the dioxin
contamination and also provides various statistical tests that can be used to assess the resultant data.  The site has
been sampled and the samples analyzed. The CRD-LV TSC evaluated and assessed the available dioxin data. A
report entitled "Statistical Analysis of Dioxin  Data Navy Ships Parts Control Center, Mechanicsburg, PA" was
provided to the RPM.

Project Name: Navy Training Center-Bainbridge (NTCB) Superfund Site
Site: Navy Training Center-Bainbridge SF Site
Site ID: MDD985397256                                     Job Order No: 226  10106. 207-S0060

Type-Lead:
Requested by: Drew Lausch (215) 597-3161
Lead Scientist: A.K. Singh (702) 435-3731

Start Date: September 1995
Expected Completion Date: March 1996
Revised Completion Date:

Estimated Budget: $10,000                                   Total Expenditures: $3,600
Revised Budget: $                                           Total FY96 Expenditures: $3,600
Major Contaminants:  Asbestos                                Total 1st. Qtr. Expenditures: $3,600

The Naval Training Center-Bainbridge (NTCB) occupies approximately  1250 acres of land near Port Deposit, MD
and was constructed in 1941 as a World War II training facility. A majority of NTCB was deactivated in 1976,
although a portion of this installation was used by the Department of Labor for a job training program until 1990.
This federally-owned facility is listed on the Federal Agency Hazardous Waste Compliance Docket, which was
established pursuant to Section 120(c) of the Comprehensive Environmental Response, Compensation and Liability
Act of 1980, as amended (CERCLA).

The EPA has determined that  previous sampling efforts developed by the U.S. Navy have been inadequate in terms
of characterizing asbestos contaminated soils. To assist in characterizing site contaminants, the CRD-LV TSC was
requested to review and provide comments  on the proposed sampling/monitoring approach. The TSC provided
comments and recommendations  pertaining to the suggested approach.
Project Name: Philadelphia Naval Complex
Site: Philadelphia Naval Complex (PNC) SF Site
Site ID:                                                    Job Order No:

Type-Lead:
Requested by: Lorie Baker (215) 597-3165
Lead Scientist: A.K. Singh (702) 435-3731
Start Date:
Expected Completion Date: March 1996
Revised Completion Date:
                                                10

-------
Estimated Budget: $6,000
Revised Budget: S
Major Contaminants: Organics/Inorganics
Total Expenditures: $3,280
Total FY96 Expenditures: $3,280
Total 1st. Qtr. Expenditures: $3,280
The Regional RPM requested assisstance in assessing background levels on and near the Philadelphia Naval
Complex. The Navy has completed a statistical analysis of background samples that were taken both on- and off-
base in order to develop background concentrations for the entire base. The results are compiled in the draft
document entitled, "Background Soil Samplinng and Analysis at Philadelphia Naval Comples, Philadelphia, PA",
dated  13 September 1995.

The PNB was recommended for closure under the Base Realignment and Closure Act of 1990. The Navy, EPA,
and the Pennsylvania Department of Environmental Protection (PADEP) have been working to ensure that the
entire property is "clean" prior to its transfer to the City of Philadelphia. As part of the clean-up effort, it was
determined that a background study was necessary to characterize background or ambient soil constituent
concentrations in the area.

The TSC reveiwed and assessed the available data and provided a report to the RPM titled "Review Comments on
the Statistical Analysis Performed on the Background Data from the Philadelphia Naval Complex, Philadelphia,
PA".
Project Name: Saegertown Industrial Area Superfund Site
Site: Saegertown Industrial Area SF Site
Site ID:

Type-Lead:
Requested by: Steven Donohue (215) 597-3166
Lead Scientist: A. K. Singh (702) 435-3731

Start Date: November 1995
Expected Completion Date: April  1996
Revised Completion Date:

Estimated Budget:$6,000
Revised Budget:
Major Contaminants: VOCs
Job Order No:207-S0060
Total Expenditures: $3,600
Total FY96 Expenditures: $3,600
Total 1st. Qtr. Expenditures: $3,600
The Saegertown site covers about 100 acres that contain several industrial operations.  In 1980, State analysts
discovered volatile organic compundds (VOCs) in the Saegertown Municipal Water Authority's Well #2. Several
potentialsources of VOCs and lead contamination have been identified on site. GATX cleaned and repaired
railroad tank care here from the mid-1950s to 1965 disposing of wash water, sludge, and tanker waste on site. EPA
tests in 1984 found VOCs and polycyclic aromatic hydrocarbons (PAHs) in on-site pond sediments and soil. On-
site monitoring wells also revealed contamination from lead and other heavy metals. Region III has completed the
RI/FS and ROD at the site and are proceeding with pre-design efforts to delineate the extent of the ground water
plume. The CRD-LV TSC was requested to statistically assess if the contaminant levels in groundwater were
increasing or decreasing.  An assessment of the site data was completed. A report titled "Trend Analysis for Total
VOCs: Saegertown Site" was provided to the Region.
                                                11

-------
REGION 4

•   Project Name: Abderdeen Pesticide Dumps NPL Superfund Site
    Site: Aberdeen Pesticide Area SF Site
    Site ID:                                                    Job Order No: 226 10106

    Type-Lead:
    Requested by: Kay Crane (404) 347-7791
    Lead Scientist: A.K. Singh (702) 435-3731

    Start Date: November 1995
    Expected Completion Date: April 1996
    Revised Completion Date:

    Estimated Budget: $10,000                                  Total Expenditures: $5,190
    Revised Budget: $                                          Total FY96 Expenditures:  $300
    Major Contaminants: Organics                                Total 1st Qtr. Expenditures: $300

    The Region IV RPM requested that the CRD-LV TSC review a soil remedial design that was proposed by the
    PRPs. The design and the statistical tests required to assess cleanup attainment were provided in a "Data
    Acquisition Report/Preliminary Cutline Document and a Design Criteria Report".

    The TSC reviewed these documents and provided suggestions and recommendations for improving the suggested
    approach. The PRP's reviewed the TSC recommendations and requested further explanations. The RPM
    requested a review of "APDS Committee Responses to Technical Review Comments on the Farm Chemicals.
    Twin Sites, Fairway Six Avon Preliminary Soil Remedial Design (3070RD)". The TSC reviewed this document
    and provided comments and recommendations
    Project Name: Marzone
    Site: Marzone Inc. SF Site
    Site ID:

    Type-Lead:
    Requested by: Annie Godfrey (404) 347-3555 x6250
    Lead Scientist: A.K. Singh (702) 435-3731

    Start Date: November 1995
    Expected Completion Date: April 1996
    Revised Completion Date:

    Estimated Budget: $ 10,000                                  Total Expenditures: $5,190
    Revised Budget: $                                          Total FY96 Expenditures: $300
    Major Contaminants: Organics                                Total 1st. Qtr. Expenditures: $300

    The Marzone, Inc. Pesticide plant was established in 1950 on a 1 Vi acre site in Tifton, Georgia. The facility
    operated until 1982, when a new owner began using its warehouse as a distribution center.  Chevron Chemical Co.
    Started blending dry powders at the site in the 1950s and constructed a building for formulating liquids some time
    during 1963 through 1964. The owners added a drum storage facility, three 10,000-gallon solvent tanks, one
    12,000-gallon toxaphene (insecticide) tank, and a wastewater pond. The site has changed ownership five times
    since 1970; four of these owners were agricultural chemical companies.
                                                   12

-------
    The groundwater and soils are contaminated with pesticides including toxaphene, lindane, and endrin from the site
    disposal areas.  Discoloration of the soil and numerous dead birds on the site indicated the spread of
    contamination.

    The PRP has proposed utilizing a geostatistical approach to determine excavation boundaries and for the
    confirmation of attainment of clean-up standards, The TSC has reviewed a number of PRP suggested approaches
    met with the PRPs and have provided a number of suggestions and recommendations.  The TSC will provide
    assessment of the resulting data.
REGION 5
•   Project Name: Allied Chemical/Ironton Coke Superfund Site
    Site: Allied Chemical/Ironton Coke SF Site
    Site ID:                                                    Job Order No: 226 10106

    Type-Lead:
    Requested by: Thomas Alcamo (312) 886-7278
    Lead Scientist: Neal Amick (702) 897-3231

    Start Date: May 1995
    Expected Completion Date: September 1995
    Revised Completion Date: May 1996

    Estimated Budget: $20,000                                   Total Expenditures: $142   PC&B: $500
    Revised Budget: $                                           Total FY96 Expenditures:  PC&B: $500
    Major Contaminants: PAHs                                   Total 1st. Qtr. Expenditures: PC&B: $500

    The Allied Chemical site is a former  coke plant that has five lagoons that were used for wastewater treatment and
    disposal. The site remedy consists of incineration of approximately 122,000 cubic yards of lagoon five wastes
    along with other contaminated materials having contaminant concentrations greater than 1000 ppm. The primary
    contaminants are four carcinogenic PAHs (benzo (a) pyrene), chrysene, benz (a) anthracene and dibenz (a,h)
    anthracene).

    The remedial approach requires that  the contaminated materials be screened and segregated prior to incineration.
    To address this screening requirement, the RPM has requested that the CRD-LV TSC provide on-site PAH
    measurements using the Field Portable Scanning Spectrofluormeter (FPSS).

    Because of the uncertainty pertaining to the FPSS's performance in adequately measuring these PAHs, the RPM
    sent samples from the site to Las Vegas for analysis. The samples were analyzed and the data provided to the
    RPM.  Initial response from  the Region pertaining to the analyzed data indicates that the FPSS may be utilized at
    this site.
    Project Name: Byron Salvage Yard
    Site: Byron Salvage SF Site
    Site ID:                                                    Job Order:

    Type-Lead:
    Requested by: Doug Yeskis (312) 886-0408
    Lead Scientist: Alan Crockett (208) 526-0603/Bob Starr INEL

                                                    13

-------
Start Date: March 1995
Expected Completion Date: September 1995
Revised Completion Date: February 1996

Estimated Budget: $10,000                                   Total Expenditures: $8,921
Revised Budget: $                                           Total FY96 Expenditures: $0
Major Contaminants: VOCs                                  Total 1st. Qtr. Expenditures: $0

A Regional Groundwater Forum member requested CRD-LV TSC's assistance in reviewing soil-gas work
completed on the Byron Salvage Yard Superfund site. The Byron Salvage Yard site is located in Byron, Illinois in
an area with  fractured dolomite/limestone overlain by approximately 10 feet of glacial till. The till is mainly
composed of sandy loam. The depth to groundwater is approximately 65-70 feet below ground surface.

The specific  issues which require TSC's attention are related to whether soil-gas concentrations are related to
volatilization for the groundwater, or indicative of a source of VOCs directly from a nearby disposal area. An
initial assessment of the data was completed and provided to the Region.  Additional support may be required.
Project Name: Lorain County Pesticide Superfund Site
Site: Lorain County SF Site:
Site ID: 95-5T-05F-TFA-050B8                              Job Order No: 226 10106

Type-Lead:
Requested by: Steve Renninger (216) 835-5200/Mike Murphy (216) 323-9540
Lead Scientist: Dave Atkinson (208) 526-9745 DSfEL

Start Date:  April 1995
Expected Completion Date: November 1995
Revised Completion Date: January 1996

Estimated Budget: $ 15,000                                  Total Expenditures: $5,682
Revised Budget: $                                          Total FY96 Expenditures: $1,005
Major Contaminants: Methyl Parathion                        Total 1st Qtr. Expenditures: $1,005

The Regional On-Scene Coordinator requested that CRD-LV assist in measuring levels of methyl parathion that
was sprayed in a number of homes in Lorain County, Ohio. This request will involve on-site measurements using
the innovative technology, "Ion Mobility Spectrometry." Problems using this measurement technology were
identified prior to the on-site effort. At this time, efforts to solve the measurement problem(s) are being addressed.
 Project Name: Ottawa
 Site: Ottawa S.F. Site
 Site ID:                                                     Job Order No:

 Type-Lead:
 Requested by: Verneta Simon (312) 886-3601
 Lead Scientist:

 Start Date: October 1995
 Expected Completion Date: December 1995
 Revised Completion Date:
                                                 14

-------
    Estimated Budget: $3,000
    Revised Budget: $
    Major Contaminants: Radionuclides
Total Expenditures:        PC&B: $ 1,000
Total FY96 Expenditures:   PC&B: $1,000
Total 1st. Qtr. Expenditures PC&B: $1,000
    The OSC requested the TSC to evaluate the current methods to measure Ra 226 in soils at the Ottawa site.  This
    effort involved recommendations and/or suggestions pertaining to identifying possible alternatives for measuring
    Ra 226 in the field at a reasonable cost. The TSC responded by providing suggestions and recommendations.
    Project Name:  Petoskey Municipal Well Field
    Site: Petoskey Municipal SF Site
    Site ID: MID006013049
Job Order No: 224 10197
    Type-Lead:
    Requested by: Terese Van Donsel (312) 353-6564
    Lead Scientist: Joe Donnelly (208) 897-3387/Wayne Sovocool (702) 798-2212

    Start Date: October 1994
    Expected Completion Date: December 1995
    Revised Completion Date: May 1996
    Estimated Budget: $25,000
    Revised Budget: $
    Major Contaminants: Organics
Total Expenditures: $1,716
Total FY96 Expenditures: $0
Total 1st. Qtr. Expenditures: $0
    The TSC was requested by the Regional RPM to provide analytical support.  A number of site matrices are
    involved. For example, nearby wells contain volatile organic compounds such as trichloroethylene. In addition,
    because of the use and disposal of spent solvents and/or paint sludges, the soils are contaminated with high levels
    of VOCs and SVOCs and elevated levels of metals.  A hydraulic fluid release also complicated the contaminant
    profile of both soils and groundwaters.

    Because of the large number of tentatively identified compounds (TICs) in the site matrices, the CRD-LV will
    receive samples for analysis. The TICs fingerprinting analysis is currently on hold.
REGION 6

•   Project Name: South Cavalcade
    Site: South Cavalcade SF Site
    Site ID:  TXD980810386

    Type-Lead:
    Requested by: Glenn Celerier (214) 665-8523
    Lead Scientist: A.K. Singh (702) 435-3731

    Start Date: July 1994
    Expected Completion Date: January 1995
    Revised Completion Date: April 1996

    Estimated Budget: $7,000
    Revised Budget: $35,000
    Major Contaminants: Organics
Job Order No: 226 01106
Total Expenditures: $30,224, PC&B $1,600
Total FY96 Expenditures:    PC&B $100
Total 1 st. Qtr. Expenditures:  PC&B $ 100
                                                   15

-------
    Beazer East, Inc. (BEI) representing the PRP(s) is implementing a Record of Decision issued for the South
    Cavalcade Superfund Site in Houston, Texas. In July, the RPM requested a review of these statistical methods as
    described in Section 2.0 and Section 4.0 of "Draft Confirmational Sampling Plan (Dames & Moore, June 1994,
    REV 1)" for the South Cavalcade Superfund Site.

    The confirmational sampling plan outlines the overall sampling strategy and specific sampling and analysis
    procedures for the confirmation of the clean perimeter of the impacted areas, and for verification that impacted
    soils have been remediated in accordance with EPA guidance.

    CRD-LV TSC scientist(s) reviewed the appropriate sampling plan sections and provided the Regional RPM with
    suggestions and recommendations. CRD-LV TSC scientists participated in a negotiation meeting with the PRPs
    during the second and third quarters to discuss monitoring/sampling design approaches. The CRD-LV TSC
    completed two data audits during the fourth quarter. The results were provided to the RPM. Additional audits are
    anticipated.
REGION 7
    Project Name: Cherokee County Kansas
    Site: Cherokee SF Site
    Site ID:

    Type-Lead: Fund
    Requested by: David P. Williams (913) 551-5030
    Lead Scientist: Bill Cole (702) 897-3226

    Start Date: July 1995
    Expected Completion Date: March 1996
    Revised Completion Date:

    Estimated Budget: $10,000
    Revised Budget: $
    Major Contaminants: Heavy Metals
Job Order No: 226 10106
Total Expenditures: $2,879 PC&B $1,000
Total FY96 Expenditures:  PC&B $ 1,000
Total 1st. Qtr. Expenditures: PC&B $1,000
    The Cherokee County site is a mining area covering about 110 square miles. It is part of a larger area sometimes
    called the Tri-State Mining District, which encompasses Cherokee County in Kansas, Jaspar County in Missouri,
    and Ottawa County in Oklahoma. One hundred years of widespread lead and zinc mining created piles of mine
    tailings, covering 4000 acres in southeastern Cherokee County alone. The mine tailings containing lead, zinc, and
    cadmium, have leached into the shallow groundwater.  Runoff from the waste piles also has moved contaminants
    into nearby streams. The Regional OSC requested the use of CRD-LV TSC's X-Ray Fluorescence technology and
    equipment to measure site contaminants.
    Project Name:  Oronogo-Duenweg
    Site: Oronogo-Duenweg SF Site
    Site ID:

    Type-Lead: Fund
    Requested by:  David P. Williams (913) 551-5030
    Lead Scientist: Bill Cole (702) 897-3226
Job Order No: 226 10106
                                                   16

-------
    Start Date: July 1995
    Expected Completion Date: March 1996
    Revised Completion Date:

    Estimated Budget: $10,000
    Revised Budget: S
    Major Contaminants: Heavy Metals
Total Expenditures: PC&B $1,000
Total FY96 Expenditures:    PC&B $ 1,000
Total 1st. Qtr. Expenditures: PC&B $1,000
    The Oronogo-Duenweg Mining Belt site, which covers 6,400 acres, is considered part of the Tri-State Mining
    District of Missouri, Kansas, and Oklahoma. Two other sites in the district, Cherokee County in Kansas, and Tar
    Creek in Oklahoma, were placed on the NPL in 1983. Lead and zinc ores, as well as some cadmium ores, were
    mined from 1848 to the late 1960's. The site is honeycombed with underground workings, pits, shafts, (open,
    closed, and collapsed), mine tailings, waste piles, and ponds holding tailing waters.  An estimated 10 million tons
    of wastes or tailings are on the site.

    The OSC has requested the assistance of the CRD-LV TSC to provide FPXRF support in characterizing soils for
    heavy metal contamination.
REGION 8

    There are no sites in Region VIII
REGION 9

•   Project Name:  Allied Signal North Hollywood
    Site: Allied Signal SF Site
    Site ID:
                                                               Job Order No:
    Type-Lead:
    Requested by: Dave Setter (415) 744-2260
    Lead Scientist: Alan Crockett (208) 526-1574/Jeff Sondrup (208) 526-8396

    Start Date: June 1994
    Expected Completion Date: March 1995
    Revised Completion Date: June 1996
    Estimated Budget: $30,000
    Revised Budget: $100,000
    Major Contaminants:Organics
Total Expenditures: $108.452
Total FY96 Expenditures: $36,472
Total 1st. Qtr. Expenditures: $36,472
    The Region IX RPM requested that the TSC provide assistance in evaluating the Allied Signal site as a source of
    ground water contamination within the North Hollywood Operable Unit. Specifically, the TSC evaluation will
    focus on the following:

    •   Determine if Allied's soil gas investigation was performed using appropriate field and analytical methodology,

    •   Perform an independent assessment of the data, and compare these findings with those made by Allied's
        contractor,
                                                    17

-------
•   Determine whether the placement of probes was adequate to characterize source area, and

•   Identify data gaps and make recommendations as to whether additional work is necessary.

In addition, the TSC will provide assistance in determining if Allied's soil boring investigation was performed
using appropriate field and analytical methodology, determine whether the placement of borings was adequate to
characterize source areas, attempt to determine whether the findings of the soil boring study are consistent or
inconsistent with the soil gas results, comment on the soil matrix data in light of the subsurface conditions found,
particularly address the likelihood that contaminant releases would have a 'wandering' pattern through the
subsurface, and identify data gaps and make recommendations as to whether additional work is necessary.

In support of this effort, TSC scientist(s) provided the document titled, "Review of Environmental Characterization
Data concerning the Allied Signal, Inc., North Hollywood Site, San Fernando  Operable Unit, San Fernando
Valley, California." A Conflict of Interest (COI) problem as identified was resolved during the second quarter of
FY95. A meeting between Region 9, NEIC, INEL and CRD-LV personnel was held to address and identify further
assessment needs. These needs included additional assessment of site data and to testify in court concerning
sources of contaminants. This project is on-going.


Project Name: Concord Navel Weapons Station NPL Site
Site: Concord Naval SF Site
Site ID:                                                     Job Order No:

Type-Lead:Fund
Requested by: Richard Freitas (415) 744-2315/Barbara M. Smith (415) 744-2366
Lead Scientist: Alan Crockett (208) 526-1574/Bob Starr (208) 526-5687

Start Date: March 1995
Expected Completion Date: December 1995
Revised Completion Date: April 1996

Estimated Budget:$12,000                                    Total Expenditures:  $3,820
Revised Budget:                                              Total FY96 Expenditures: $0
Major Contaminants: Mercury (Heavy Metals)                   Total 1st. Qtr. Expenditures: $0

The Naval Weapons Station Concord is in the north-central portion of Contra Costa County, approximately 30
miles northwest of San Francisco, California. The station operated an ocean terminal facility to transship ordnance
from trucks or railcars to ships and vice versa. The base realignment and closure activities at other facilities in the
west have made Concord a significant military ordnance and transshipment facility  on the west coast. The station
encompasses nearly 13,000 acres.

At the present time, RI work plans and field sampling  plans for Tidal and Inland Areas have been submitted and
approved by the Navy, State, and EPA. Work will commence on these sites in April, 1995. The work plan for an
Ecological Assessment of the Litigation Sites has been approved to evaluate the remaining effects of hazardous
levels of heavy metals  not previously removed by the Navy. This work is also scheduled to begin in April, 1995.
Investigations of groundwater as a contaminant transport pathway into the Tidal Area Sites and Litigation Sites has
been postponed, pending data from soils, sediments, and surface water, and input from the CRD-LV TSC technical
experts.

The evaluation and implementation of better approaches to address the question of groundwater as a transport
pathway for organic and inorganic contaminants in wetland soils and sediments is a significant technologic gap in
the investigation  of wetland sites at Concord. The CRD-LV TSC is currently reviewing available site data. A
recommended sampling approach was provided to the Region.  This project is currently on-going.

                                                 18

-------
•   Project Name: Hawker Pacific Superfund Site
    Site: Hawker Pacific SF Site
    Site ID:

    Type-Lead:
    Requested by: Dave Seter (415) 744-2260
    Lead Scientist: Greg Stormberg (208) 526-1241

    Start Date: December 1995
    Expected Completion Date: June 1996
    Revised Completion Date:

    Estimated Budget: $150,000
    Revised Budget: $
    Major Contaminants: Organics
Job Order No:
Total Expenditures: $1,846
Total FY96 Expenditures: $1,846
Total 1st. Qtr. Expenditures: $1,846
    The Hawker Pacific Site is located in North Hollywood, CA. Operations at Hawker have consisted of the
    overhaul, repair, and manufacture of aircraft landing gear and flight control equipment. Processes include alkaline
    and acid cleaning, vapor degreasing, etching, chroming, and electro-plating of cadmium, nickel and functional
    chrome. Additional supporting processes include grinding, painting, and baking of parts, as well as testing of
    finished parts using a water-based dye.

    EPA believes that the Hawker Pacific Site has been inadequately characterized, especially with respect to the
    storage tank release. No soil gas data exists at the site.  No groundwater exists at the site. EPA's regional
    groundwater monitoring program has interpreted the presence of PCE in groundwater beneath the site. In order to
    evaluate the areal and vertical extent of source areas, and to assess the site's contribution to groundwater
    contamination, additional data needs to be collected and analyzed.

    The TSC is preparing the necessary sampling and data quality plans, specifications, and health and safety plans, to
    conduct site characterization requirements.
•   Project Name: Luke AFB Audit
    Site: Luke AFB SF Site
    Site ID:

    Type-Lead:
    Requested by: Stephen Remaley (415) 744-1496
    Lead Scientist: Mary Wolf (702) 897-3384

    Start Date: August 1994
    Expected Completion Date: October 1995
    Revised Completion Date: April 1996

    Estimated Budget: $25,000
    Revised Budget: $
    Major Contaminants: Inorganics/Organics
Job Order No: 224 01113
Total Expenditures: $15,584
Total FY96 Expenditures: $0
Total 1st. Qtr. Expenditures: $0
    The TSC was requested to conduct an audit of raw data generated by the analysis of samples collected at the Luke
    AFB Superfund Site. The audit of these data  focused on authenticating laboratory adherence to the principles of
    good laboratory practice in reporting results for compounds with contractual criteria. The audit addressed
    laboratory results for calibrations (criteria compounds), surrogates, internal standards areas, and tuning compound

                                                    19

-------
    results. The audit was completed during the fourth quarter FY95. Additional data audit explanations were
    provided to the Region. Possible field analysis may be required.
•   Project Name: Marine Corps Air Station Yuma (MCASY) Superfund Site
    Site: Marine Corps Air Station Yuma SF Site
    Site ID:                                                     Job Order No: 246 10106

    Type-Lead: Fund
    Requested by: Rachel Simons (415) 744-2383
    Lead Scientist: Mary Wolf (702) 897-3384

    Start  Date: September 1995
    Expected Completion Date: December 1995
    Revised Completion Date: March 1996
    Estimated Budget: $10,000
    Revised Budget: $
    Major Contaminants: Organics
Total Expenditures: $3,500       PC&B $300
Total FY96 Expenditures: $3,500  PC&B $300
Total 1st Qtr. Expenditures:$3,500 PC&B $300
    The TSC was requested to audit raw data generated by a commercial laboratory from samples collected from the
    MCASY Superfund Site. The audit of these data utilizing magnetic tapes will address authenticating laboratory
    adherence to principles of good laboratory practice in reporting results for compounds with contractual criteria.
    This audit will include laboratory results for calibrations, (criteria compounds), surrogates, internal standards and
    tuning compound results.
    Project Name:  Modesto Groundwater Superfund Site
    Site: Modesto SF Site
    Site ID:
    Type-Lead:
Job Order No:
    Requested by: John Lucey (415) 744-2222
    Lead Scientist: Alan Crockett (208) 526-1574, Bob Starr (208) 526-5687 Greg Hulet (208) 526-0283

    Start Date: December 1994
    Expected Completion Date: September 1995
    Revised Completion Date: March 1996
    Estimated Budget: $50,000
    Revised Budget: $
    Major Contaminants: Radionuclides/Organics
Total Expenditures: $45,953
Total FY96 Expenditures: $0
Total 1st. Qtr. Expenditures: $0
    The Regional RPM requested technical support for the Modesto Groundwater Contamination Superfund Site
    located in Modesto, California. The Site consists of a dry cleaner facility which leaked PCE contamination into the
    soil and groundwater. It was recently discovered that the groundwater is also contaminated with naturally
    occurring uranium. EPA has performed an RI/FS at the site and selected a preferred cleanup alternative which
    consists of pump and treat with GAC for groundwater contamination, and SVE for soil contamination. The FS will
    now have to be revised to evaluate remedial technologies for the cleanup of radiation related to the naturally
    occurring uranium.
                                                   20

-------
The objective of this technical support effort is to assist the RPM in selecting the most reliable, efficient and cost
effective remedial technologies to clean up the site.  The following three areas are being addressed by the CRD-L V
TSC:

•   Identify data gaps in existing data and recommend additional data requirements. The groundwater, soil, and
    soil gas, were tested for many different parameters during the RI. Besides uranium the groundwater was also
    tested for gross alpha, gross beta, and radium. The soil-soil gas was not analyzed for radiation.

•   Identify potential radiation remedial technologies. There are several remedial technologies (or combination of
    technologies) which could be utilized for groundwater remediation at the site. Potential technologies
    including reverse osmosis, ion exchange, air stripping, and granular activated carbon (GAC).

•   Prepare site cleanup cost estimate for each appropriate technology. After the appropriate technologies are
    identified a cost estimate will be prepared.

In support of this effort the CRD-LV TSC has provided, "Recommended Data Acquisition for the Modesto
Groundwater Contamination Site" and the report, "Treatment Alternatives Report Modesto Groundwater
Contamination Site."  The RPM is currently reviewing these documents. A site visit to audit sampling procedures
was made during the fourth quarter. This effort is still on-going.
Project Name: San Fernando Valley Basin (SFV)
Site: San Fernando SF Site
Site ID:
Job Order No:
Type-Lead:
Requested by: Ned Black (415) 744-2253
Lead Scientist A.K. Singh (702) 435-3731

Start Date: October 1994
Expected Completion Date: September 1995
Revised Completion Date: March 1996

Estimated Budget: $5,000
Revised Budget: $
Major Contaminants: Organics
Total Expenditures:         PC&B: $600
Total FY96 Expenditures:   PC&B: $ 100
Total 1st. Qtr. Expenditures: PC&B: $100
 Four sites are within the San Fernando Vally (SFV) for inclusion on the National Priority List (NPL): North
 Hollywood, Crystal Springs, Pollock, and Verdugo. Currently, EPA is managing the four areas as one large site
 referred to as the SFV Superfund Site. This site includes the four NPL sites and adjacent areas where groundwater
 contamination is known or presumed to have migrated. There are currently a total of 87 RI monitoring wells
 located inland adjacent to the four NPL sites.  Three of the shallow water table wells are screened in bedrock and
 do not have pumps installed. Trichloroethylene (TCE) and tetrachloroethylene (PCE) data were used to separate
 the 84 RI wells into two categories:  those recommended to be sampled quarterly, and those recommended to be
 sampled annually. All 84 of the RI wells were originally included in the annual monitoring program. Of these 84
 wells, 41 historically having concentrations of TCE and/or PCE in excess of federal and state maximum
 contaminant levels (MCLs) were placed into the quarterly monitoring program.

 The Region is concerned with both PCE and TCE as contaminants in the groundwater. It has been suggested that
 krieging using plume maps might be a good way to access changes in contaminant concentrations over time. In
 addition, the Region is interested in any other means of characterizing migration of the contaminant plumes or
 changes in contaminant concentrations over time which seem pertinent.

                                                 21

-------
    The CRD-LV TSC reviewed the provided data and identified a number of data assessment methods that could be
    used to assess contaminant behavior over time. The TSC provided some additional recommendations to the RPM.
    This project is still on-going.
REGION 10
•   Project Name: Bunker Hill
    Site: Bunker Hill SF Site
    Site ID: IDD048340921                                       Job Order No: 224 10198

    Type-Lead:
    Requested by: Greg Gervais (206)553-1906/Danny Jackson (702) 897-3245
    Lead Scientist: Russ Plumb (702) 897-3265

    Start Date: September 1994
    Expected Completion Date: September 1995
    Revised Completion Date: January 1996

    Estimated Budget: $25,000                                    Total Expenditures: $25,182
    Revised Budget: $35,000                                      Total FY96 Expenditures: $0
    Major Contaminants: Inorganics                                Total 1st. Qtr. Expenditures: $0

    The Region X Project Officer requested that approaches be examined to determine whether the Bunker Hill site
    characterization techniques have been addressed sufficiently:  A sampling/monitoring approach for confirming the
    vertical and lateral extent of soil/sediment contamination, procedures for identifying levels of soil, sediment, and
    possibly water contamination, the quality assurance/quality control (QA/QC) plan, the S&A plan and all other
    methods that have been used to fully characterize the site for remedial  purposes.  In addition, an assessment of data
    needs necessary to satisfy the characterization objectives will be required if past characterization efforts have not
    adequately characterized the sites contaminants. This data assessment will involve data interpretation and
    recommendations involving statistical and other tests necessary for making decisions concerning the extent of site
    contaminants.

    This technical support project will increase the knowledge of how to assess impacts on local hydrologygeology for
    the tailings. This effort is critical not only to site characterization and to development of monitoring strategies for
    detecting pollution, but also for contributing to appropriate corrective action programs. Also, this effort will
    integrate saturated and unsaturated zone monitoring, and site characterization methods used in developing a
    monitoring well and sampling network design at mine sites. Assessing  site documents and data is in process. A
    number of recommendations  pertaining to the monitoring design  and data assessment was provided to the Region.
    This project is still on-going.
                                                     22

-------
                            SUPERFUND SHORT-TERM REQUESTS
Project Name: Short Term Requests
Site: Short Term Requests
Site ID:

Type-Lead:
Requested by: See Below
Lead Scientist: TSC/CRD-LV Staff Scientists

Start Date: October 1991
Expected Completion Date: December 1995
Revised Completion Date:

Estimated Budget: $150,000
Revised Budget: $200,000
Major Contaminants: Variable

TSC requests that can be completed within a 40-hour period:
Job Order No: 224 10106, 207 S0060
Total Expenditures: $238,173
Total FY96 Expenditures: $2,399
Total 1st. Qtr. Expenditures: $2,399
REGION
STATE
9
7
9
3
9
TIO
9
4
10
2
9
9
CALIF
4

DATE
Nov.
Nov.
Nov.
Oct.
Oct.
Nov.
Dec.
Oct.
Oct.
Dec.
Nov.
Nov.
Nov.
Oct.
Oct.
SITE


Yuma
Elrama School


Hawker Pacific



Saegertown


Marzone

REQUESTOR
K. Shimmin
S. Marques
S. Remaley
G. Lapsley
K. Lynch
R. Steimle
D. Setter
K. Malley
D. Green
J. Josephs
J. Barney
S. Donohue
M. Woods
A. Godfrey
D. Porter
TELEPHONE
NUMBER
(415)744-1257
(913)551-7131
(415)744-1496
(215)597-6684
(206)553-8316
(703)308-8846
(415)744-2260
(404)347-7791
(206)553-8582
(212)637-4317
(709)963-0320
(215)597-3166)
(916)255-3666
(404)347-3555
(908)225-6116
NATURE OF
REQUEST
Emergency Res.
Issue Paper
Audit
Data Assessment
Analysis
Issue Paper
Data Assessment
Sampling
Sampling
Workshop
Sampling
Data Assessment
Analysis
Data Assessment
Sampling
                                             23

-------
4
10
4
9
3
9
5
5
3
9

2
3

3
INEL
3
4
Oct.
Nov.
Dec.
Dec.
Oct.
Oct.
Nov.
Nov.
Dec.
Dec.
Dec.
Nov.
Nov.
Dec.
Oct.
Oct.
Oct.
Nov.
Oak Ridge
Wycolf


Ft. Geo. Meade


Allied Signal
Navy Ships
Modesto
Metcoa
Brown Fields



INEL
Mining Sites

D. Combs
P. Rubenstine
R. Jackson
K. Erickson
D. Lausch
D. Shane
V. Simon
O. Thompson
A. Sochanski
J. Lucey
D. Menial
F. Freestone
F. Vavra
R. Holding
P. Leonard
G. Carpenter
S. Baget
G. Santi
(615)481-8002
(206)553-1067
(404)349-3555
(415)744-2324
(215)597-9890
(415)744-2286
(312)353-9176
(312)886-4843
(215)597-3167
(415)744-2222
(617)576-1555
(908)321-6632
(215)597-0676
(812)336-8396
(215)597-3163
(208)522-5049
(610)558-1730
(813)744-6100
Report
Analysis
Fact Sheets
Issue Paper
Sampling
Sampling
R&D Monitoring
Analysis
Data Assessment
Data Assessment
CRG
Samples
Issue Paper
Analysis
Issue Paper
Geophysics
Analysis
XRF
24

-------
                                   RCRA CORRECTIVE ACTION

REGION 1


REGION 5

•   Project Name: Columbus Solid Waste Reduction
    Site: Columbus Waste-To-Energy RCRA Facility
    Site ID:                                                   Job Order No: 222 10609

    Type-Lead:
    Requested by: Carole T. Braverman (312) 886-2910
    Lead Scientist: A. K. Singh (702) 435-3731/Vicki Ecker (702) 897-3223

    Start Date: March 1995
    Expected Completion Date: September 1995
    Revised Completion Date: June 1996

    Estimated Budget: $10,000                                  Total Expenditures: $26,293  PC&B $3,000
    Revised Budget: $75,000                                   Total FY96 Expenditures: $0 PC&B $3,000
    Major Contaminants:Dioxin                                 Total 1st Qtr Expenditures:$0 PC&B $3,000

    The Columbus municipal Electric Utility Boiler, also known as the Columbus Municipal Electric Plant (CMEP),
    is located south of downtown Columbus, Ohio. The facility is a power generating plant fueled by coal and
    refuse. It has been in operation since 1983 and is owned and operated by the City of Columbus.

    In 1987, the US EPA initiated a study of the incinerator ash at CMEP because of the presence of dioxin and
    furan isomers associated with incinerator ash. The special study report indicated that incinerator ash contains
    dioxin and furan isomers, lead and cadmium.  Concentrations of dioxin and furan isomers range from 0.33 ppb
    to 2.13 ppb. The highest concentrations were found in top ash from a conveyor belt. A relatively high
    concentration (0.84 ppb) was found from a stack scape sample. Dioxins (up to 0.38 ppb) were also found in two
    areas in the soil where ash was allowed to accumulate. Lead in the ash was found to exceed EP toxicity limits,

    The Regional Risk Assessor has requested that the CRD-LV TSC design a sampling/monitoring strategy and a
    quality assurance project plan that would identify the concentration of soil dioxins.  The soil dioxin
    concentrations that are of interest are 20,40,70 and 100 ppt. The CRD-LV TSC designed a
    sampling/monitoring program and finalizing the quality assurance project plan.  This project is in process.
REGION 8


•  Project Name:  EXXON Billings Refinery
    Site: EXXON Refinery RCRA Facility
    Site ID:                                                   Job Order No: 226 10611

    Type-Lead:

                                                  25

-------
    Requested by: Stephanie Wallace (406) 449-5414 Ext 227
    Lead Scientist: Neal Amick (702) 897-3231

    Start Date: June 1995
    Expected Completion Date: September 1995
    Revised Completion Date: M ;rch 1996

    Estimated Budget: $8,000
    Revised Budget: $
    Major Contaminants: PAHs
Total Expenditures: $2,607
Total FY96 Expenditures: $0
Total 1st. Qtr. Expenditures: $0
    The Region is currently over-seeing a facility investigation at the EXXON Refinery. The objective(s) of this
    investigation are to identify and determine if waste constituents have affected soil or groundwater quality and to
    summarize the nature and geophysical extent of any affected soils and/or groundwater.

    The CRD-LV has been requested to assist in this effort by measuring the levels of PAHs in sampled media using
    the Field-Portable Scanning Spectrofluorometer.  The measurements were made during the fourth quarter of
    FY95. After receiving the confirming results, a report identifying the samples analyzed and the results obtained
    will be submitted.
REGION 9
    Project Name: Greenfield
    Site: Greenfield Environmental of Arizona RCRA Facility
    Site ID: EPA ID AZD980892731

    Type-Lead:
    Requested by: Ron Leach (415)744-1044
    Lead Scientist: Phil Arberg (702)798-2545

    Start Date: December 1995
    Expected Completion Date: April 1996
    Revised Completion Date:

    Estimated Budget: $4,500
    Revised Budget:
    Major Contaminants: Solvents & Pesticides
Job Order No: 2026R010
Total Expenditures^ 1,809
Total FY96 Expenditures: $1,809
Total 1st Qtr. Expenditures: $1,809
    The Regional RCRA Project Manager (RPM) requested that the Characterization Research Division Las Vegas
    (CRD-LV) Technology Support Center (TSC) provided an analysis of historical aerial photographs for the
    Greenfield Environmental of Arizona facility. Greenfield is  a commercial hazardous waste storage, treatment
    and recycling facility located in Phoenix, Arizona. Past operations at Greenfield include a storage and
    distribution center for solvents and pesticides as well as solvent recycling.

    The photographic analysis will focus on the detection of potential releases of hazardous materials to soil, air,
    groundwater, and surface water. If possible, the analysis will also evaluate overall waste management practices
    at the facility from about 1940 to the present with emphasis on years after 1960. This effort is currently in
    process.
                                                   26

-------
REGION 10
    Project Name: Georgetown RCRA Facility
    Site: Georgetown RCRA Facility
    Site ID:

    Type-Lead: RCRA
    Requested by: David Domingo (206) 553-8582
    Lead Scientist: Anitia Singh (702) 897-3422

    Start Date: November  1995
    Expected Completion Date: February 1996
    Revised Completion Date:

    Estimated Budget: $5,000
    Revised Budget: $
    Major Contaminants: VOCs
Job Order No: 207-R0020
Total Expenditures; $3,000
Total FY96 Expenditures: $3,000
Total 1st. Qtr. Expenditures: $3,000
    The RCRA Regional Project Officer requested that the CRD-LV TSC evaluate statistical approaches that were
    being used to identify trends in groundwater contamination. The Mann-Kendall test was used to make this trend
    evaluation.

    The TSC evaluated the available data and provided a report that addressed the proper use of this test for
    examining trends.  Additional data evaluations are anticipated.
                                                  27

-------
                              RCRASHORT TERM REQUEST
Project Name: Short-term RCRA Technical Support
Site: Short Term RCRA Technical Support
Site ID:

Type-Lead:
Requested by: See below
Lead Scientist: CRD-LV/TSC Staff Scientists

Start Date: October 1, 1991
Expected Completion Date: December 1995
Revised Completion Date: September 1996

Estimated Budget: $8,000
Revised Budget: $40,000
Major Contaminants:
Job Order No: 226 10602
Total Expenditures: $42,556
Total FY96 Expenditures: $2,190
Total 1st. Qtr. Expenditures: $2,190
TSC requests that can be completed within a 40-hour period. See request below:
REGION
5
5
5
5
5
Hd .Qtrs.
5
DATE
Nov.
Nov.
Dec.
Nov.
Nov.
Nov.

SITE
Columbus
Columbus
Columbus
Columbus

Columbus
Columbus
REQUESTOR
P. Gehring
C. Braverman
S. Mangion
R.Winklhofer
C. Tsang
M. Lorber
J. Schneider
TELEPHONE
NUMBER
(216)522-7260
(312)886-2910
(312)353-7499
(216)522-7260

(202)260-8927
(312)886-0880
NATURE OF
REQUEST
Analysis
Analysis
Tech Support
Tech Support



                                             28

-------
                   SUPERFUND REMOTE SENSING SHORT TERM REQUEST
Project Name: Remote Sensing
Site: Superfund Short Term Remote Sensing Technical Support
Site ID:

Type-Lead:
Requested by: See below
Lead Scientist: CRD-LV/TSC Staff Scientists

Start Date: 1993
Expected Completion Date: September 1996
Revised Completion Date:

Estimated Budget: $20,000
Revised Budget: $30,000
Major Contaminants:
Job Order No: 221 95755
Total Expenditures: $28,470
Total FY96 Expenditures: $2,952
Total 1st. Qtr. Expenditures: $2,952
TSC Remote Sensing requests that can be completed within a 40-hour period. The CRD-LV TSC is requested to
provide Remote Sensing support that requires a quick-turn-around time. Projects that may be addressed within this
40 hour time frame include:

     •    The use of Geographic Information Systems (GIS) for site characterization.

     •    Providing plots of geostatistical related data for site characterization.

     •    Review of RI/FS reports and workplans, pertaining to the use of multi-spectral scanner, remote sensing
           and GIS technologies.

     •    Review of identification and technological techniques and methods used in remote sensing site
           assessment.

     •    Providing expert testimony, coordinating and/or contributing to the validity and authenticity of "remote
           sensing" data used in cost recovery cases.
REGION
9
9
DATE
Nov.
Dec.
SITE


REQUESTOR
R. Freitas
S. Hogan
TELEPHONE
NUMBER
(415)744-2315
(415)744-2236
NATURE OF
REQUEST
Photographs
Photographs
                                                29

-------
                       RCRA REMOTE SENSING SHORT TERM REQUEST
Project Name: Remote Sensing
Site: RCRA Short Term Remote Sensing Technical Support
Site ID:

Type-Lead:
Requested by: See below
Lead Scientist: CRD-LV/TSC Staff Scientists

Start Date:  1993
Expected Completion Date:September 1996
Revised Completion Date:

Estimated Budget: $20,000
Revised Budget: $30,000
Major Contaminants:
Job Order No: 221 95615
Total Expenditures: $842
Total FY96 Expenditures: $100
Total 1st. Qtr. Expenditures: $100
TSC Remote Sensing requests that can be completed within a 40-hour period. The CRD-LV TSC is requested to
provide Remote Sensing support that requires a quick-turn-around time. Projects that may be addressed within this
40 hour time frame include:

     •     The use of Geographic Information Systems (GIS) for site characterization.

     •     Providing plots of geostatistical related data for site characterization.

     •     Review of RI/FS reports and workplans, pertaining to the use of multi-spectral scanner, remote sensing
           and GIS technologies.

     •     Review of identification and technological techniques and methods used in remote sensing site
           assessment.

     •     Providing expert testimony, coordinating and/or contributing to the validity and authenticity of "remote
           sensing" data used in cost recovery cases.
REGION
9
9
DATE
Nov.
Dec.
SITE
Greenfield

REQUESTOR
R. Leach
S. Hogan
TELEPHONE
NUMBER
(415)744-2031
(415)744-2236
NATURE OF
REQUEST
Photographs
Photographs
                                                30

-------
                                             ISSUE PAPER

Project Name: Identifying Background
Site: Identifying Background
Site ID:

Type-Lead: Frank Vavra (215) 597-0676
Requested by: Engineering Forum
Lead Scientist: Bob Breckenridge (208) 526-0757, Alan Crockett (208) 526-1574

Start Date: March 1993
Expected Completion Date: July 1994
Revised Completion Date: September 1995

Estimated Budget: $25,000                                        Total Expenditures: $68,901
Revised Budget:$30,000                                          Total FY96 Expenditures: $9,485
Major Contaminants: Metals                                       Total 1st. Qtr. Expenditures: $9,485

Background:  Many states have developed requirements for cleanups that are more stringent than risk based levels
and sometimes to background levels. The variability of naturally occurring inorganics may lead Federal/state
representatives to conclude that an area of a site has elevated metals just because of this variability.  Establishment of
background based both on site specific sampling and comparison to normal background ranges can help resolve this
issue. Additionally, Natural Resource Trustees may request/require remediation of streams to levels below typical
background levels of man-made substances in developed areas.  Areas near roads usually have elevated levels of lead
from leaded gasoline, elevated levels of PAHs from exhaust and asphalt road material, elevated levels of zinc from
oxidation of car metals and elevated levels of inorganics from road salt/ashes. These contaminants are washed into
ditches near the road and accumulate with time. Sites that were used as farmland may have elevated levels of
pesticides and inorganics from fertilizers and pesticides.  For example, lead arsenate was the pesticide of choice for
orchards at one time in the past and fertilizers often contain lead which can accumulate in soils.  Identification of
representative background levels is often difficult and is complicated by the presence of roads, farms or other land
use.

The CRD-LV TSC was requested by the Engineering Forum to develop a standard process/procedure to identify
background levels of naturally occurring inorganics and typical levels of man-made substances in soils and sediments
that may also be site contaminants. The goal is to produce an issue paper that identifies critical elements that must
be taken to obtain representative background levels and the available processes that can assist in this determination.
Existing documents and sources of information will be reviewed and appropriate material will be referenced. A
planning meeting was  held to scope out and generate an outline identifying elements that will be addressed in the
Issue Paper.  This outline was completed and reviewed by the Engineering Forum. During the 1st Quarter, FY 94 an
initial draft of the issue paper was completed. The draft issue paper was provided to the Engineering Forum for
review. The TSC addressed the Forum's comments, and prepared the document for peer review. The document has
been peer reviewed and was finalized for publication.
                                                   31

-------
                                         ISSUE PAPER
Project Name: On-Site Analytical Methods and Field Sampling for Exploring in Soil
Site:Explosives in Soil
Site ID:
Type-Lead:
Requested by: Federal Facilities Forum
Lead Scientist: Alan Crockett (208) 526-1574

Start Date: November 1995
Expected Completion Date: June 1996
Revised Completion Date:

Estimated Budget: $30,000
Revised Budget: $
Major Contaminants: Explosives
Total Expenditures: $18,433
Total FY96 Expenditures: $12,060
Total 1st. Qtr. Expenditures: $12,060
The Federal Facilities Forum requested the CRD-LV TSC to prepare an Issue Paper addressing the current
"State of Technology" with regards to "On-Site Analytical Methods" for identifying explosive contaminants in
soils.  In addition, this issue paper will discuss appropriate sampling/monitoring approaches thai may be
implemented to characterize these types of contaminants.

An outline that identifies the elements and scope that will be addressed in this paper was finalized. An initial
draft is scheduled for February.
                                               32

-------
                                          COORDINATION
•   Project Name: Superfund Coordination
    Site: Superfund Coordination
    Site ID:
JOB: Order No: 226 10101
    Type-Lead:
    Requested by: Ken Brown
    Lead Scientist: Phil Malley (702)897-6644/Alan Crockett (208)526-1574

    Start Date: On-going October 1991
    Expected Completion Date: September 1996
    Revised Completion Date:
    Estimated Budget: $100,000
    Revised Budget: $106,000
    Major Contaminants: N/A
Total Expenditures: $21,751
Total FY96 Expenditures: $21,751
Total 1st. Qtr. Expenditures: $21,751
    This project provides for Superfund coordination of requests received by the Technology Support Center and
    implemented when assigned to the off-site contractor. Activities include preparation of reports and tracking of
    projects, and documenting costs.
•   Project Name:  RCRA Coordination
    Site: RCRA Coordination
    Site ID:
Job Order No: 226 10601
    Type-Lead:
    Requested by:
    Lead Scientist:Phil Malley, LESAT

    Start Date: On-going October 1991
    Expected Completion Date: September 1995
    Revised Completion Date:

    Estimated Budget: $40,000
    Revised Budget: $7,000
    Major Contaminants: N/A
Total Expenditures: $0
Total FY96 Expenditures: $0
Total 1st. Qtr. Expenditures: $0
    This project provides for RCRA coordination of requests received by the Technology Support Center and
    implemented when assigned to the off-site contractor. Activities include preparation of reports, tracking of
    projects, and documenting costs.
                                                  33

-------
                                 TECHNOLOGY TRANSFER
Project Name:  Superfund Technology Transfer
Site: Superfund Technology Transfer
Site ID:                                                    Job Order No: 224 10020

Type-Lead:
Requested by: Director TSC
Lead Scientist: Clare Gerlach (702)897-3321

Start Date:
Expected Completion Date: September 1996
Revised Completion Date:

Estimated Budget: $80,000                                   Total Expenditures: $9,231
Revised Budget: $                                           Total FY96 Expenditures: $9,231
Major Contaminants:                                         Total 1st. Qtr. Expenditures: $9,231

One of the objectives of the CRD-LV TSC is to identify and make available CRD-LV measurement
technologies that are applicable for characterizing contaminants. Documenting the adequacy of these
technologies, the application and their identity requires the development of case studies, fact sheets,
demonstrations and workshops. During this quarter a case study identifying the sampling/monitoring and
analytical methods that were used to characterize mercury contamination at Oak Ridge was printed. In
addition, one four-page fact sheet was developed.
                                              34

-------