US EPA

RESOURCE
MANAGEMENT
COMMITTEE
UPDATES
(FORMERLY STANDING COMMITTEE
ON CONTRACTS MANAGEMENT)
Suj>j>lemerit& to Contracts Management at
EPA: Managing our Mission, EPA/200/R-92-
001

-------
   «vs>
     \         UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                             WASHINGTON, D C  20460
                                                                          OFFICE OF
                                                                       ADMINISTRATION
MEMORANDUM                                                      AND RESOURCE s
                                                                        MANAGEMENT

SUBJECT:   Distribution of Resource Management Committee (formerly Standing Committee
             on Contracts Management) Material

                              Y                ''   ~' /
FROM:      JuneMackey• •// y r  ^ .  /'',"*',,•   ./  '
             Resource Management Committee Staff
                         / /
                        :--
TO          All EPA Libraries
       In order to keep you updated on our progress in the area of resource management
improvements, I have enclosed the quarterly status report* of the Resource Management
Committee (RMC) Recommendations.  The report summarizes-the 'current status *bf Afeftdns in
Progress and Completed Actions.

       This quarter, we completed Recommendation No. 32. This re^orrimendjjj.pn^iddressed
the need for EPA to evaluate its disciplinary system"fo ensure fough, ecgj&aM^jq~pd'-$Qesistent
treatment of personnel who violate Agency rules and-requirements.  To improve the disciplinary
system, we have: 1) issued EPA Order 3120.2 on Conduct, and Discipline for Senior "Executive
Service; 2) completed and distributed a Disciplinary Process Handbook for|A|j$5ICy etfiplbyees;
and 3) issued an amendment to EPA Order 3120.1 on Conduct and Discipline to incluoje a Table
of Penalties covering resource management violations

       Over the past three years, EPA has worked hard to improve its -resource, management
practices by implementing the 40 recommendations in the SCCM Report. "We" have met the
charge of the SCCM to write or redefine policies and procedures and put into place new
processes that improve the way we manage and use our resources.

       This memo serves as the final report on the SCCM recofmmeijdations. We have
implemented 38 of the 40 recommendations,  leaving only Recommendations No. 37 and 40.
These recommendations require long term systems development pflbrjts which vfi
complete in 1997. We are:  1) upgrading the Integrated ConfiSfct'^^*	iV¥
System to include electronic commerce and contract  award capabilities! g^2J^fg«M3ciung our
Personal Property System with our Integrated Financial Management

       I can be reached at (202)260-8433 and would be hapj$ t

Attachment
          Recycled/Recyclable .Printed with Vegetable Oil Based Inks on 100°. Recycled Paper (40% Postconsumer)

-------
                       FINAL STATUS REPORT
                            July 1995

   STANDING COMMITTEE ON CONTRACTS MANAGEMENT RECOMMENDATIONS
           (Renamed the Resource Management Committee)
     This Report provides the final update of progress made on
the forty recommendations in EPA's June 1992 report Contracts
Management at EPA:  Managing Our Mission:   Recommendations of the
Standing Committee on Contracts Management.

     The actions described in this Report  address improvements in
EPA's contract management.  Because EPA uses contracts for a wide
range of goods and services, accountable contracts management is
essential to the overall sound management" of the Agency.

     By June 1993, the scope of the Standing Committee on
Contracts Management was expanded to include assistance and
relevant aspects of financial management,  as well as acquisition.
The Committee was renamed the Resource Management Committee.
The Status Report is organized into two sections:

o         Completed Actions: 38 of the 40  actions have been
          completed.  The report provides  a contact point, if
          appropriate, for the final product.

o         Actions in Progress: The two actions in progress
          require long-term system development efforts which will
          continue through FY 1997.  The approach to these
          actions has been approved and progress will be
          monitored by Agency resource officials.

     Copies of the June 1992 report and this Status Report are
available in EPA  libraries.  For further information on the
Resource Management Committee, please contact the Committee staff
at (202)260-4600.

-------
RESOURCE MANAGEMENT COMMITTEE REPORT
       APRIL  THRU JUKE,  1995
         ACTIONS  COMPLETED
MCOMKENDATION W,
Recommendations 1-4
5
6, 12
7
8, 9
10
11
13
ACTIONS COMPUTED
Reorganized Office of Administration and Resources Management
Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
Contact: Document Distribution Unit, 202-260-8573
Issued Chapter 14 to Contracts Management Manual establishing requirement for
"contracting team" concept for individual contracts from award to close out.
Dated: February 18, 1994 Contact: Paul Schaffer, EPA/OAM 202-260-9032
Establish Senior Resource Officials - EPA Order Signed 3/22/94
Contact: Thelma Adams, OHROS, 202-260-5000
Issued guidance for new PMPIA Process, and the Contracts Management Guiding
Principles, June 6 and June 8, 1994. Contact: Kathy Sedlak- O'Brien 202-260-9650
(FMFIA process) or Tom O'Connell 202-260-8268 (Guiding Principles) .
Issued revision to Chapter l to Contracts Management Manual requiring Contract
Management Plans for all major contracts.
Issued revision to Chapter l to the Contracts Management Manual requiring Annual
Acquisition Plans defining contract needs.
Dated: February 18, 1994 Contact: Ed Murphy, EPA/OAM 202-260-6034
Co- located administrative contracting officers with OSWER program managers, project
officers and work assignment managers in Crystal Gateway Building on July 11, 1994.
Contact: Paige Peck, EPA/HQ 202-260-2548

-------
                      RESOURCE MANAGEMENT COMMITTEE REPORT
                             APRIL THRU JUNE, 1995
                               ACTIONS COMPLETED
  HO.    ACTIONS COMPLETED                                                         ?agre 2
    14  Workforce Planning (balance of Intramural to Extramural Resources?.
        Final NAPA Report, dated November 1994 distributed to Agency Officials.
                                        Contact:  Terry Grindstaff, EPA/HQ  202-260-1170
    15  Revised FY93 Budget Request
    16  Gave Priority to Acquisition Management in FY 1994
    17  Appointed SES to Lead Training Program
    18  Completed revision to Chapter 7,  CMM to clarify roles, responsibilities and
        limitations of employees performing contract management activities.
                               09/27/94      Contact:  Marilyn Torpey, 0AM, 202-260-5019
19,  20  Completed Training Sessions with Deputy Ethics Officials;
        Ethics Orientation Courses given January, April, and July, 1993
21,  22  Completed Compendium of Courses; Issued directive for project officer training,-
        developed Instituationalization Plan including automation and integration of
        training efforts.                Contact:  William Sanders,  OARM/IO, 202-260-3081
    23  Issued revision to Acquisition Manual to specify education requirement for
        Procurement Professionals.       Contact: , William Sanders, OARM/IO, 202-260-3081
    24  Procurement Guidance Documents Indexed, Contact:  Ed Murphy,  0AM, 202-260-6034
    25  Issued Independent Government Cost Estimates (IGCEs) on June 27, 1994
                                                Contact:  Don Hambric, 0AM, 202-260-9404

-------
                             RESOURCE MANAGEMENT COMMITTEE REPORT
                                     APRIL THRU JUNE,  1995
                                        ACTIONS COMPLETED
RECOMMENDATION NO.    ACTIONS COMPLETED                                                         Page 3
                 26  Issue Monthly Contract Management Policy Bulletins
                                                          Contact:   Ed Murphy,  0AM,  202-260-6034
                 27  Identified Procurement Responsibilities in Job Announcements
                                                          Contact:   Hector Suarez,  OHROS,  202-260-330B
                 28  Emphasized Contract Management in Performance Agreements
                                                          Contact:  Hector Suarez,  OHROS,  202-260-3308
                 29  Described Acquisition Management in Positions Descriptions
                     Requirements Memorandum Dated:   09/30/92
                     OHRM Policy and Research Division Advisory #93-1008  Dated:   09/29/92
                                                          Contact:  Hector Suarez,  OHROS,  202-260-3308
             30,  31  Completed the Career Ladder Guide for Project Officers and Policy on Crediting
                     Extramural Mgmt.  Experience.  09/30/94  Contact:  Sharon Furrow,  OHROS,  202-260-3735
                 32  Developed guidelines and tools to enhance disciplinary system that ensures
                     equitable,and consistent treatment of personnel who violate Agency rules and
                     requirements.                           Contact: Don Sadler, 202-260-3328
                 33  Use IGCEs to Analyze Contractor Costs   Contact:   Paul Schaffer,  0AM
                     Policy Memorandum Dated:   03/03/93                202-260-9032
                 34  Issued Guidance and Training Materials to EPA Training Instructors on the use of
                     Suspension and Debarment:   08/18/94  Contact:  Thomas Sullivan,  OHROS,  202-260-1988

-------
RESOURCE MANAGEMENT COMMITTEE REPORT





        APRIL THRU JUNE,  1995





          ACTIONS COMPLETED
RECOMMENDATION NO. ACTIONS COMPLETED

Page 4
35 Use Other Contract Types: EPA signed pledge to participate in Performance Based
Contracting. Selected pilot in RTP, NC. Contact: Ed Murphy, 0AM 202-260-6034
36, 38 Enactment of Federal Acquisition Streamlining Act on October 14, 1994 requires
contractors to certify (under possible penalties) that overhead does not include
unallowable costs. Contact: Don Hambric, 0AM 202-260-9404
39 Adherence to Prompt Pay Act
Report Issued Dated: 12/17/92
Contact :
Doug Barrett, EPA/RTP
919-541-3041

-------
RESOURCES MANAGEMENT COMMITTEE REPORT
        APRIL  THRU JUNE  1995
         ACTIONS IN PROGRESS
OFFICE
OIRM
AO
Aexjo»S'iK PROGRESS? OBJECTIVES
37 Develop an Integrated Contract
Management Information System
40 Reconcile Personal Property
System with Integrated
Financial Management System
NEXT ACTIOK PATE
Implement electronic commerce
and contract management
capabilities. Accept delivery
of Contracts Management module
for FY 95 implementation. 12/30/95
Modify system to accommodate
EPA specific needs. Analysis
and desiqn complete. 12/30/95
SROJ6CTE0 PfcOfctlCT AND
COMPLETION BATE
Expand I CMS to the Agency's
program offices.
09/30/97
Implement Personal Property
System.
07/30/96

-------

                 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

        ?                       WASHINGTON, D C. 20460

^i PRO^P
                                        May5, 1995
                                                                            OFFICE OF
                                                                          ADMINISTRATION
                                                                          AND RESOURCES
                                                                           MANAGEMENT


   MEMORANDUM

   SUBJECT:   Distribution of Resource Management Committee (formerly Standing Committee
                on Contracts Management) Material
                                                         *

   FROM-       JuneMackey  \/^^^ J^f^^^^
                Resource Management Committee Staff     ^r^

   TO.          All EPA Libraries
          In order to keep you updated on EPA's progress in the area of resource management
   improvements, I have enclosed the quarterly status report of the Resource Management
   Committee (RMC) Recommendations  The report summarizes the current status of Actions in
   Progress and Completed Actions

          This quarter, we completed Recommendations No  21 & 22 We developed and
   distributed a Compendium of Courses relating to all aspects of resources management. We also
   formally established a training requirement that all potential project officers  successfully
   complete training before they may be formally designated as a project officer. This includes
   project officers for contracts, grants, cooperative agreements and Interagency agreements.  We
   have also made improvements in the area of automation of training courses and reporting.

          Please let me  know if you  have any questions (202)260-8433.


   Attachment
             Recycled/Recyclable . Pnnled wilh Vegetable Oil Based Inks on 100% Recycled Paper (40% Poslconsumer)

-------
                           STATIIS REPORT

    STANDING COMMITTEE ON CONTRACTS MANAGEMENT RECOMMENDATIONS
            (RENAMED THE RESQURCE MANAGEMENT COMMITTEE)


     This Status  Report provides an update of progress made on
the forty recommendations in EPA's June 1992 report Contracts
Management  at  EPA:   Managing Our Mission;  Recommendations of the
Standing Committee  on Contracts Management.

     The actions  described in this Report address improvements in
EPA's contract management.   Because EPA uses contracts for a wide
range of goods and  services, accountable contracts management is
essential to the  overall sound management of the Agency.

     By June 1993,  the scope of the Standing Committee on
Contracts Management was expanded to  include assistance and
relevant aspects  of financial management, as well as acquisition.
The Committee  was renamed the Resource Management Committee.
The Status  Report is organized into two sections by the current
status of the  actions:

     o      -    Actions in Progress:   The approach to these
                actions has been approved and implementation plans
                are underway.

                This chart is organized by lead office.  The chart
                lists the objective, the current status and
                projected product completion date.

     o    -    Completed Actions:   Actions completed with a
                contact point, if appropriate,  for the final
                product.

     Copies of the June 1992 report and this Status Report are
available  in EPA libraries.  For further information on the
Resource Management Committee, please contact  the Committee staff
at  (202)260-0198.

-------
                                        RESOURCES MANAGEMENT COMMITTEE REPORT
                                              JANUARY THRU MARCH 1995
                                                ACTIONS IN PROGRESS
 LEAD
 OFFICE
OIRM
 ACTIONS IN PROGRESS:  OBJECTIVES
37  Develop an Integrated Contract
    Management Information System
                                               NEXT ACTION            DATE
Implement electronic commerce
and contract award
capabilities in Cincinnati,
Regions 2 thru 10 and NEIC.
Accept delivery cf contracts
Management module for FY 96
implementation.             '    09/30/95
                                              PROJECTED'PRODUCT AND
                                                  COMPLETION DATE'-'
Implement Phase I of the
Integrated Contracts
Management System  03/30/96
 AO'
40  Reconcile Personal Property
    System with Integrated
    Financial Management System
Award contract to enhance the
Federal Financial System Fixed
Assets Subsystem to     ,
accommodate EPA specific        04/15/95
needs. Detailed design
document, delivered to EPA.	07/01/95
Implement Personal Property
System              06/30/96
          32  Evaluate Disciplinary System
                                    Resolve comments due on Table
                                    of Penalties sent out under
                                    Green Border Review.
                                                                              05/30/95
                                          Complete Disciplinary System
                                          to include table of
                                          penalties for both SES and
                                          non-SES workforce.
                                                    	07/01/95

-------
                                   RESOURCE MANAGEMENT COMMITTEE REPORT

                                         JANUARY THRU MARCH, 1995

                                             ACTIONS COMPLETED
 RECOMMENDATION MO.    ACTIONS COMPLETED
 Recommendations 1-4   Reorganized Office of Administration and  Resources  Management	

                   5   Cookbook entitled "How to Get Contracts Awarded  at  EPA"  distributed  12/30/93
	Contact:   Document Distribution Unit,  202-260-8573	

               6,  12   Issued Chapter 14 to Contracts Management Manual establishing requirement  for
                      "contracting team" concept for individual contracts from award to close  out.
	Dated:  February IB,  1994	Contact:  Paul Schaffer,  EPA/QAM 202-260-9032	

                   7   Establish Senior Resource Officials  - EPA Order  Signed  3/22/94
	Contact:  Thelma  Adams,  OHROS,  202-260-5000	

               8,   9   Issued guidance for new FMFIA Process, and the Contracts Management  Guiding
                      Principles,  June 6 and June 8,  1994.   Contact:   Kathy Sedlak-O'Brien 202-260-9650
	(FMFIA process)  or Tom O'Connell 202-260-0260 (Guiding  Principles).	

                  10   Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
                      Management Plans for all  major contracts.
                  11   Issued revision to Chapter 1 to the  Contracts Management Manual requiring  Annual
                      Acquisition Plans defining contract  needs.
	Dated;  February 18,  1994	Contact: Ed Murphy,  EPA/QAM   202-260-6034	

                  13   Co-located administrative contracting officers with OSWER program managers, project
                      officers  and work assignment managers in  Crystal Gateway Building on July  11, 1994.
	Contact:   Paige  Peck, EPA/HQ   202-260-254S	

                  14   Workforce Planning (balance of Intramural  to  Extramural  Resources.
                      Final  NAPA Report,  dated  November 1991 distributed  to Agency Officials.
	Contact:   Terry  Grindstaff,  EPA/HQ  202-260-1170

                  15   Revised FY93 Dudqet  Request                    	

-------
                                   RESOURCE MANAGEMENT COMMITTEE REPORT


                                         JANUARY THRU MARCH, 1995


                                            ACTIONS COMPLETED
RECOMMENDATION NO.   ACTIONS COMPLETED	      ._	  Pa9a 2
                 16  Gave Priority to Acquisition Management in FY94
                 17  Appointed SES to Lead Training Program
                 18  Completed revision to chapter 7, CMM to clarify roles, responsibilities and
                     limitations of employees performing contract management activities.
                	09/27/94	Contact:  Marilyn Torpey, QAM, 202-260-5019
             19, 20  Completed Training Sessions with Deputy Ethics Officials;
            	Ethics Orientation Courses given January, April, and July, 1993
             21, 22  Completed Compendium or Courses; Issued directive for project officer training;
                     developed Instituationalization Plan including automation and integration of
            	training efforts.	Contact;  'William Sanders, OARM/IO, 202-260-3081
                 23  Issued revision to Acquisition Manual to specify education requirement for
                     Procurement Professionals.	Contact;  William Sanders, OARM/IO, 202-260-3081
                 24  Procurement Guidance Documents Indexed, Contact:  Ed Murphy,  0AM, 202-260-6034
                 25  Issued Independent Government Cost Estimates (IGCEs) on June 27, 1994
                    	Contact;  Don Hambric, QAM, 202-260-9404
               26  Issue Monthly Contract Management Policy Bulletins
               	' Contact:  Ed Murphy, QAM, 260-6034
                 27  Identified Procurement Responsibilities in Job Announcements
                    	Contact:  Hector Suarez,  OHROS, 202-260-3308
                 28  Emphasized Contract Management in Performance Agreements
                                                          Contact:  Hector Suarez,  OHROS, 202-260-3308

-------
                              RESOURCE  MANAGEMENT  COMMITTEE  REPORT

                                     JANUARY THRU MARCH,  1995

                                        ACTIONS COMPLETED
 RECOMMENDATION HO.   ' ACTIONS COMPLETED  ". '	[	   Paqie 3  '_'_

                  29  Described Acquisition  Management in Positions Descriptions
                      Requirements Memorandum Dated:   09/30/92
                      OHRM Policy and Research Division Advisory #93-1008   Dated:   09/29/92
	Contact;  Hector Suarez,  OHROS,  202-260-3308

              30,  31  Completed the Career Ladder Guide for Project Officers and Policy on  Crediting
	Extramural Mgrot.  Experience.  '09/30/94  Contact;  Sharon Furrow,  OHROS,  202-260-3735

                  33  Use IGCEs to Analyze Contractor Costs       Contact:   Paul Schaffer,  0AM
	Policy Memorandum Dated:   03/03/93	202-260-9032	

                  34  Issued Guidance and Training Materials to EPA Training Instructors on the use of
                      Suspension and Debarment:   08/10/94  Contact:  Thomas Sullivan,  OHROS,  202-260-1988


                  35  Use Other Contract Types:   EPA  signed pledge to participate  in Performance Based
	Contracting.   Selected pilot in RTP,  NC.     Contact;   Ed Murphy,  0AM  202-260-6034

              36,  38  Enactment of Federal Acquisition Streamlining Act on  October 14,  1994 requires
                      contractors to certify (under possible penalties)  that overhead  does  not include
	unallowable costs.	Contact:   Don Hambric, QAM  202-260-9404

                  39  Adherence to Prompt Pay Act         -     Contact:  Doug Barrett,  EPA/RTP
            	Report Issued Dated;   12/17/92	919-541-3041	

-------
2  .
uss
'\       UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

8                  WASHINGTON. D.C. 20460
 ^PHO.-


                              JAN 10 1995
                                                             OFFICE OF
                                                           ADMINISTRATION
                                                           AND RE SOURCES
                                                            MANAGEMENT
 MEMORANDUM                  j:,\ | 8 ISSf

 SUBJECT:   Distribution of Resource  Management Committee  (formerly
           Standing Committee  on  Contracts Management) Material
 FROM:      June Macke                   .
           Resource Management Committee
                     f *'
 TO:        All EPA Libraries


      In order to keep you updated  on EPA's progress in *:hs  area
 of resource management improvements,  I have enclosed- the
 status report of the Resource Management Committee (RMC)
 Recommendations.  This report covers the months 6 c Nqveaber and
 December.   It summarizes the current status of Actions, in
 Progress and Completed Actions.  In December we etoaprt.ioied the
 following recommendation:

      Recommendation No. 14.   The  Standing Committee on Contracts
      Management (SCCM/RMC) recommended that EPA's program and
      regional strategic plans, annual budgets, and ope raring
      plans reflect formal workforce planning and justix-y
      proposed mix of intramural  and extramural
      At Administrator Browner 's  initiative,  the -National Academy
      of Public Administration  (NAPA)  conducted an independent
      analysis of the Agency's use  of  intramural 2nd axtrairural
      resources.  NAPA issued its final  report to the Agency  in
      November.  This report completes the: traftkifcg" of -this-
      recommendation through the  SCCM/RMC report.  .

      The NAPA Report raises some important, issues regarding
      workforce planning.  To address  these, issues, EPA will
      initiate a comprehensive evaluation to'^sr.ess itr workforce
      planning and management needs.   The evaluftti.esi. will be  co-
      lead by the Office of the Comptroller &nd./£h& O£i!ice of
      Human Resources and Organizational Services «,,'" '.l^r. effort
      will support decisions to redirect and "jget;z>ajknl>:e:!:is>cing
      resources to achieve top mission priorifei us amd^sfc carrent
      fiscal constraints.
                                                         Kecycled/Recyclable
                                                         Prtntid wlih Sey/dnola Ink on paper that
                                                         oontalnt it least 50% recycled fiber

-------
                               -2-

     For reporting purposes, milestones and reporting schedules.
     will be established to keep internal and external parties
     informed of the progress on the workforce planning
     initiative.

     In addition to workforce planning, the Agency has taken the
     following actions  to  implement Recommendation 14:

     1)  The FY 94 OMB  budget submission included a review of the
     contract workforce to better balance the mix of intramural
     and extramural resources.

     2)  The FY 95 budget  formulation included a thorough base
     review and information on extramural resources management.

     3)  EPA undertook  a formal, involved process to identify
     vulnerabilities in its contractor functions and reached
     decisions to convert  900 contractor workyears to in-hous.e
     FTEs.

     Beginning in 1995,  we plan to change our reporting cycle
from monthly to quarterly  because so much progress has been made
on these actions.  We have completed 35 of the 40 original
Standing Committee recommendations.  Of the five remaining, two
are major system enhancements which are on track but will not be
complete until 1996.  The  remaining three recommendations are
scheduled for completion in the first half of 1995.  If you have
any questions concerning the recommendations, please call me on
(202)260-0198.

Attachment

-------
                          STATUS REPORT

           	ON CONTRACTS MANAGEMENT RE<
           (RENAMED THE RESOURCE MANAGEMENT COMMITTEE)
     This Status Report provides an update of progress made on
the forty recommendations in EPA's June 1992 report Contracts
Management at EPA:  Managing Our Mission;  Recommendations of the
Standing Committee on Contracts Management.

     The actions described in this Report address improvements in
EPA's contract management.  Because EPA uses contracts for a wide
range of goods and services, accountable contracts management is
essential to the overall sound management of the Agency.

     By June 1993, the scope of the Standing Committee on
Contracts Management was expanded to include assistance and
relevant aspects of financial management, as well as acquisition.
The Committee was renamed the Resource Management Committee.
The Status Report is organized into two sections by the current
status of the actions:

     o     -   Actions in Progress:  The approach to these
               actions has been approved and implementation plans
               are underway.

               This chart is organized by lead office.  The chart
               lists the objective, the current status and
               projected product completion date.

     o    -    Completed Actions:  Actions completed with a
               contact point, if appropriate, for the final
               product.

     Copies of the June 1992 report and this Status Report are
available in EPA libraries.  For further information on the
Resource Management Committee, please contact the Committee staff
at (202)260-0198.

-------
RESOURCE MANAGEMENT COMMITTEE REPORT
    NOVEMBER AND DECEMBER,  1994
         ACTIONS COMPLETED
RECOMMENDATION N0.<>
Recommendations

6,

a,




1-4
5
12
7 .
9
10
11
13
14
15
ACTIONS \caaiam *•>** ?''&^ 'fv->rM^fe'N ^VV^'fr-is^1' £•' 'V\^ ?|:^T^^M
Reorganized Office of Administration and Resources Management
Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
Contact: Document Distribution Unit, 202-260-8573
Issued Chapter 14 to Contracts Management Manual establishing requirement for
"contracting team" concept for individual contracts from award to close out.
Dated: February 18, 1994 Contact: Paul Schaffer, EPA/OAM 202-260-9032
Establish Senior Resource Officials - EPA Order Signed 3/22/94
Contact: Thelma Adams, OHROS, 202-260-5000
Issued guidance for new FMFIA Process, and the Contracts Management Guiding
Principles, June 6 and June 8, 1994. Contact: Kathy Sedlak-O'Brien 202-260-9650
(FMFIA process) or Tom O'Connell 202-260-B268 (Guiding Principles) .
Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
Management Plans for all major contracts.
Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
Acquisition Plans defining contract needs.
Dated: February 18, 1994 Contact: Ed Murphy, EPA/OAM 202-260-6034
Co-located administrative contracting officers with OSWER program managers, project
officers and work assignment managers in Crystal Gateway Building on July 11, 1994.
Contact: Paige Peck, EPA/HQ 202-260-2548
Workforce Planning (balance of Intramural to Extramural Resources.
Final NAPA Report, dated November 1994 distributed to Agency Officials.
Contact: Terry Grindstaff, EPA/HQ 202-260-1170
Revised FY93 Budget Request

-------
                                       RESOURCES MANAGEMENT COMMITTEE REPORT

                                            NOVEMBER AND DECEMBER, 1994

                                                ACTIONS IN PROGRESS
 LEAD
 OFFICE
 ACTIONS IN PROGRESS)  OBJECTIVES
           NEXT ACTION
  DATE
    PROJECTED PRODUCT ;;AND-<
        COMPLETION
        -    '-     •
OIRM
37  Develop an Integrated Contract
    Management Information System
Implement CDOTS in HQ,  Small
Purchase Electronic Data
Interchange(SPEDI) in HQ,  RTP,
and Reqion I
 3/30/95
Implement Phase I of the
Integrated Contracts
Management System  03/30/96
       ,
 F:
40  Reconcile Personal Property
    System with Integrated
    Financial Management System
Monitor USGS implementation of
Federal Financial System Fixed
Assets Subsystem.  Complete
requirements analysis.
                                                                              02/28/95
          Implement Personal Property
          System              06/30/96
 BBS  •
 TA1LBE
21/22  Establish Mandatory
       Training and develop
       training for POs and WANs
Develop a plan and selected     02/15/95
courses
          Publish mandatory training
          requirements and  issue
          strategic training plan
                 	03/15/95
 OHR08

  f.  •'
  Vl*'
32   Evaluate Disciplinary System
Comments due on Table of
Penalties sent out under Green
Border Review.
01/12/95
Complete Disciplinary Systc
to include table of
penalties for both SES  and
non-SES workforce.
       	03/01/95

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




    NOVEMBER AND DECEMBER,  1994




         ACTIONS COMPLETED
RECOMMENDATION NO.
16
17
18
19, 20
23
24
25
26
27
28
29
ACTIONS COMPLETED »ag« 2
Gave Priority to Acquisition Management in FY94
Appointed SES to Lead Training Program
Completed revision to Chapter 7, CMM to clarify roles, responsibilities and
limitations of employees performing contract management activities.
09/27/94 Contact: Marilyn Torpey, OAM, 202-260-5019
Completed Training Sessions with Deputy Ethics Officials;
Ethics Orientation Courses given January, April, and July, 1993
Issued revision to Acquisition Manual to specify education requirement for
Procurement Professionals. Contact: William Sanders, OARM/IO, 202-260-3081
Procurement Guidance Documents Indexed, Contact: Ed Murphy, OAM, 202-260-6034
Issued Independent Government Cost Estimates (IGCEs) on June 27, 1994
Contact: Don Hambric, OAM, 202-260-9404
Issue Monthly Contract Management Policy Bulletins
Contact: Ed Murphy, OAM, 260-6034
Identified Procurement Responsibilities in Job Announcements
Contact: Hector Suarez, OHROS, 202-260-3308
Emphasized Contract Management in Performance Agreements
Contact: Hector Suarez, OHROS, 202-260-3308
Described Acquisition Management in Positions Descriptions
Requirements Memorandum Dated: 09/30/92
OHRM Policy and Research Division Advisory #93-1008 Dated: 09/29/92
Contact: Hector Suarez, OHROS, 202-260-3308

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




     NOVEMBER AND DECEMBER, 1994




        ACTIONS COMPLETED
••* ; 	 "."""•
. RECOMMENDATION,;, lij
30,



36,

i^iftfet^ ^fjf^ -' v'V*;^WC':' -- •<;• S5y&$B$
31
33
34
35
38
39
Completed the Career Ladder Guide for Project Officers and Policy on Crediting
Extramural Mgmt. Experience. 09/30/94 Contact: Sharon Furrow, OHROS, 202-260-3735
Use iGCEs to Analyze Contractor Costs Contact: Paul Schaffer, OAM
Policy Memorandum Dated: 03/03/93 202-260-9032
Issued Guidance and Training Materials to EPA Training Instructors on the use of
Suspension and Debarment: 08/18/94 Contact: Thomas Sullivan, OHROS, 202-260-1988
Use Other Contract Types: EPA signed pledge to participate in Performance Based
Contracting. Selected pilot in RTF, NC. Contact: Ed Murphy, OAM 202-260-6034
Enactment of Federal Acquisition Streamlining Act on October 14, 1994 requires
contractors to certify (under possible penalties) that overhead does not include
unallowable costs. Contact: Don Hambric, OAM 202-260-9404
Adherence to Prompt Pay Act Contact: Doug Barrett, EPA/RTP
Report Issued Dated: 12/17/92 919-541-3041

-------
              UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                         WASHINGTON, D.C. 20460
                                                            OFFICE OF
                                                          ADMINISTRATION
                                                          AND RE SOURCES
                                                           MANAGEMENT
MEMORANDUM

SUBJECT:  Distribution of Resource Management Committee  (formerly
          Standing Committee on Contracts Management) Material
FROM:     June Mack«       ^^     _  _
          Resource M^Jr^gerne-nt (fommittee

TO:       All EPA Libraries                "'

     In order to keep you updated on EPA's progress  in  the area
of resource management improvements, I have enclosed the
October 31, 1994 status report of the Resource Management
Committee  (RCM) Recommendations.  The report summarizes the
current status of Actions in Progress and Completed  Actions.
In October, we completed the following recommendations:

     Recommendation  No. 35.   The Agency signed the Performance
     Based Contracting Pledge on October 13.  As a vcsult, we
     have selected the Facilities Management Contract in Research
     Triangle Park to pilot  performance based contracting.  The
     pilot will be monitored and the results evaluated  by tha
     Office of Federal Procurement Policy (OFPP) .    In  v.'ae next
     few weeks we will select additional contracts to participate
     in the pilot.

     Recommendations MO. 36  and 38:  These recommendations dealt
     with allowable  and unallowable costs, especially costs
     normally included in contractors' overhead  pools.

     EPA has already implemented a requirement that  contractors
     certify that their overhead claims did not  inclvde arty
     unallowable costs; however, we could not assess penalties
     without legislation.  The Federal Acquisition Streamlining
     Act provides the penalty provision that wo  siaeded.  Also,
     Section 2192 of the Act makes unallowable ti\osr> costs that
     were of concern to the Standing Committee-; on. Contracts
     Management, i.e., employee morale and h&t
-------
                               -2-

     I will continue to send you regular updates for your
information.  If you have any questions concerning the
recommendations, please call me on (202) 260-0198.

Attachment

-------
                      MONTHLY STATUS REPORT

    STANDING COMMITTEE ON CONTRACTS MANAGEMENT RECOMMENDATIONS
           (RENAMED THE RESOURCE MANAGEMENT COMMITTEE)


     This monthly Status Report provides an update of progress
made on the forty recommendations in EPA's June 1992 report
Contracts Management at EPA:  Managing Our Mission;
Recommendations of the Standing Committee on Contracts
Management.

     The actions described in this Report address improvements in
EPA's contract management.   Because EPA uses contracts for a wide
range of goods and services, accountable contracts management is
essential to the overall sound management of the Agency.

     By June 1993, the scope of the Standing Committee on
Contracts Management was expanded to include assistance and
relevant aspects of financial management, as well as acquisition.
The Committee was renamed the Resource Management Committee.
The Status Report is organized into two sections by the current
status of the actions:

     o     -   Actions in Progress:  The approach to these
               actions has been approved and implementation plans
               are underway.

               This chart is organized by lead office.  The chart
               lists the objective, the current status and
               projected product completion date.

     o    -    Completed Actions:  Actions completed with a
               contact point, if appropriate, for the final
               product.

     Copies of the June 1992 report and this Status Report are
available in EPA libraries.  For further information on the
Resource Management Committee, please contact the Committee staff
at  (202) 260-0198.

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




          OCTOBER 31, 1994




         ACTIONS COMPLETED
RECOMMENDATION NO.
Recommendations 1-4
5
6, 12
7
8, 9
10
11
13
15
16
17
ACTIONS COMPLETED
Reorganized Office of Administration and Resources Management
Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
Contact: Document Distribution Unit, 202-260-8573
Issued Chapter 14 to Contracts Management Manual establishing requirement for
"contracting team" concept for individual contracts fron award to close out.
Dated: February 18, 1994 Contact: Paul Schaffer, EPA/OAM 202-260-9032
Establish Senior Resource Officials - EPA Order Signed 3/22/94
Contact: Thelma Adams, OHROS, 202-260-5000
Issued guidance for new FMFIA Process, and the Contracts Management Guiding
Principles, June 6 and June 8, 1994. Contact: Kathy Sedlak-O'Brien 202-260-9650
(FMFIA process) or Tom O'Connell 202-260-8268 (Guiding Principles).
Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
Management Plans for all major contracts.
Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
Acquisition Plans defining contract needs.
Dated: February 18, 1994 Contact: Ed Murphy, EPA/OAM 202-260-6034
Co-located administrative contracting officers with OSWER program managers, project
officers and work assignment managers in Crystal Gateway Building on July 11, 1994.
Contact: Paige Peck, EPA/HQ 202-260-2548
Revised FY93 Budget Request
Gave Priority to Acquisition Management in FY94
Appointed SES to Lead Training Program

-------
                                   RESOURCE MANAGEMENT COMMITTEE RETORT

                                             OCTOBER 31, 1994

                                            ACTIONS COMPLETED
RECOMMENDATION NO.   ACTIONS COMPLETED
                 18  Completed revision to Chapter 7, CHH to clarify roles, responsibilities and
                     limitations of employees performing contract management activities.
             	09/27/94	Contact!  Marilyn Torpey, 0AM, 202-260-5019

             19, 20  Completed Training Sessions with Deputy Ethics Officials;
             	Ethics Orientation Courses given January, April, and July, 1993

                 23  Issued revision to Acquisition Manual to specify education requirement for
                     Procurement Professionals.	Contact;  William Sanders, OARM/IO, 202-260-3081

                 24  Procurement Guidance Documents Indexed, Contact;  Ed Murphy,  QAM, 202-260-6034

                 25  Issued Independent Government Cost Estimates (IGCEs) on June 27, 1994
             	Contact!  Don Hambric, QAM, 202-260-9404

                 26  Issue Monthly Contract Management Policy Bulletins
                                                            Contact!  Ed Murphy, QAM, 260-6034

                 27  Identified Procurement Responsibilities in Job Announcements
                                                          Contact;  Hector Suarez, OHROS, 202-260-3308

                 28  Emphasized Contract Management in Performance Agreements
                                                          Contact;  Hector Suarez, OHROS, 202-260-3308

                 29  Described Acquisition Management in Positions Descriptions
                     Requirements Memorandum Dated:  09/30/92
                     OHRM Policy and Research Division Advisory 193-1008  Dated:  09/29/92
                                                          Contact:  Hector Suarez, OHROS, 202-260-3308

-------
RESOURCE MANAGEMENT COMMITTEE REPORT



        OCTOBER 31, 1994



        ACTIONS COMPLETED
WJCOKMBNDAMON HO,
30, 31
33
34
35
36, 38
39
ACTIONS COMPLETED ~ **&* 1, '
Completed the Career Ladder Guide for Project Officers and Policy on Crediting
Extramural Mgmt. Experience. 09/30/94 Contact: Sharon Furrow, OHROS, 202-260-3735
Use IGCEs to Analyze Contractor Costs Contact: Paul Schaffer, 0AM
Policy Memorandum Dated: 03/03/93 • 202-260-9032
Issued Guidance and Training Materials to EPA Training Instructors on the use of
Suspension and Debarment: 08/18/94 Contact: Thomas Sullivan, OHROS, 202-260-1988
Use Other Contract Types: EPA signed pledge to participate in Performance Based
Contracting. Selected pilot in RTF, NC. Contact: Ed Murphy, OAM 202-260-6034
Enactment of Federal Acquisition Streamlining Act on October 14, 1994 requires
contractors to certify (under possible penalties) that overhead does not include
unallowable costs. Contact: Don Hambric, OAM 202-260-9404
Adherence to Prompt Pay Act Contact: Doug Barrett, EPA/RTP
Report Issued Dated: 12/17/92 919-541-3041

-------
                                        RESOURCES MANAGEMENT COMMITTEE REPORT


                                                  OCTOBER  31,  1994

                                                 ACTIONS IH PROGRESS
 LEAD
 OFFICE
 ACTIONS IK PR60RESSI
           NEXT ACTION
  DATE
    PROJECTED tiODUCT AKO
        COMPLBTIOH DAT*
       .
    »•',*>,'
    H
14   Workforce Planning  (Balance
     of Intramural to Extramural
	__ Resources)
                                               Final NAPA Report
                                11/30/94
          Final NAPA Report   11/30/94
bXRM
 37   Develop an Integrated Contract
     Management Information System
Implement CDOTS, Small
Purchase, and Contract Award
modules into ICMS for HQ	
12/30/94
Implement Phase I of the
Integrated Contracts
Management System  03/30/96-
          40  Reconcile Personal Property
           .   System with Integrated
              Financial Management System
                                     Monitor USGS implementation of
                                     Federal Financial System Fixed
                                     Assets Subsystem,  complete
                                     requirements analysis.
                                02/28/95
          Implement Personal Property
          System              06/30/96
 SES
2I/a2  Establish Mandatory
      •Training and develop
       training for POs and WANs
Establish target audiences,
training objectives, and
importance ranking
11/15/94
Publish mandatory training
requirements and, issue
strategic training plan
                   03/15/95
 OHROB
32   Evaluate  Disciplinary System
Publish "User-Friendly11 tools,  12/30/94
guidance and handbook.
          Complete Disciplinary System
          to include table of
          penalties for both SES and
          non-SES workforce.
          	03/01/95

-------
              UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                         WASHINGTON, D.C. 20460
                                                            OFFICE OF
                                                          ADMINISTRATION
                                                          AND RE SOURCES
                                                           MANAGEMENT


MEMORANDUM

SUBJECT:  Distribution  of  Resource Management Committee  (formerly
          Standing Committee  on Contracts Management) Material

FROM:     June Mack*    ^,-^
          Resource Ma£fc£iement <5ommittee StaL_

TO:       All EPA Libraries               "

     In order to keep you  updated on EPA's progress in the area
of resource management  improvements, I have enclosed the
October 31, 1994 status report of the Resource Management
Committee  (RCM) Recommendations.   The report summarizes the
current status of Actions  in  Progress and Completed Actions.
In October, we completed the  following recommendations:

     Recommendation No. 35.   The Agency signed the Performance
     Based Contracting  Pledge on October 13.  As a result, we
     have selected the  Facilities Management Contract in Research
     Triangle Park to pilot performance based contracting.  The
     pilot will be monitored  and the results evaluated by  the
     Office of Federal  Procurement Policy (OFPP).   In the next
     few weeks we will  select additional contracts to participate
     in the pilot.

     Recommendations NO. 36 and 38:  These recommendations dealt
     with allowable and unallowable costs,  especially costs
     normally included  in  contractors' overhead pools.

     EPA has already implemented a requirement that contractors
     certify that their overhead claims did not include any
     unallowable costs; however,  we could not assess penalties
     without legislation.  The Federal Acquisition Streamlining
     Act provides the penalty provision that we needed.  Also,
     Section 2192 of the Act  makes unallowable those costs that
     were of concern to the Standing Committee on Contracts
     Management, i.e.,  employee morale and health, and
     entertainment.  We are pleased that both parts of the Act
     were based on recommendations made by EPA in our SWAT Team
     Report of August 1992.
                                                      Recycled/Recyclable
                                                      Printed with Soy/Canoli Ink on paper that
                                                      contain* at least 50% recycled fiber

-------
                               -2-

     I will continue to send you regular updates for your
information.  If you have any questions concerning the
recommendations, please call me on (202) 260-0198.

Attachment

-------
                      MONTHLY STATUS REPORT

   STANDING COMMITTEE OH CONTRACTS MANAGEMENT RECOMMENDATIONS
           (RENAMED THE RESOURCE MANAGEMENT COMMITTEE)


     This monthly Status Report provides an update of progress
made on the forty recommendations in EPA's June 1992 report
Contracts Management at EPA;  Managing Our Mission;
Recommendations of the Standing Committee on Contracts
Management.

     The actions described in this Report address improvements in
EPA's contract management.   Because EPA uses contracts for a wide
range of goods and services, accountable contracts management is
essential to the overall sound management of the Agency..

     By June 1993, the scope of the Standing Committee on
Contracts Management was expanded to include assistance and
relevant aspects of financial management, as well as acquisition.
The Committee was renamed the Resource Management Committee.
The Status Report is organized into two sections by the current
status of the actions:

     o     -   Actions in Progress:  The approach to these
               actions has been approved and implementation plans
               are underway.

               This chart is organized by lead office.  The chart
               lists the objective, the current status and
               projected product completion date.

     o    -    Completed Actions:  Actions completed with a
               contact point, if appropriate, for the final
               product.

     Copies of the June 1992 report and this Status Report are
available in EPA libraries.  For further information on the
Resource Management Committee, please contact the Committee staff
at (202) 260-0198.

-------
RESOURCE MANAGEMENT COMMITTEE REPORT
          OCTOBER 31, 1994




         ACTIONS COMPLETED
•REOOMMENDATIdN NO. 1"
Recommendations 1-4
5
6, 12
7
8, 9
10
11
13
15
16
17
' * ' " • ^jSifr*4'. •$$&$ *&t
ACTIONS COMPLETED • , ' . ' ' . .£•• «?7 "3*
Reorganized Office of Administration and Resources Management
Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
Contact: Document Distribution Unit, 202-260-8573
Issued Chapter 14 to Contracts Management Manual establishing requirement for
"contracting team11 concept for individual contracts from award to close out.
Dated: February 18, 1994 Contact: Paul Schaffer, EPA/OAM 202-260-9032
Establish Senior Resource Officials - EPA Order Signed 3/22/94
Contact: Thelma Adams, OHROS, 202-260-5000
Issued guidance for new FMFIA Process, and the Contracts Management Guiding
Principles, June 6 and June 8, 1994. Contact: Kathy Sedlak-O'Brien 202-260-9650
(FMFIA process) or Tom O'Connell 202-260-8268 (Guiding Principles) .
Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
Management Plans for all major contracts.
Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
Acquisition Plans defining contract needs.
Dated: February 18, 1994 Contact: Ed Murphy, EPA/OAM 202-260-6034
Co-located administrative contracting officers with OSWER program managers, project
officers and work assignment managers in Crystal Gateway Building on July 11, 1994.
Contact: Paige Peck, EPA/HQ 202-260-2548
Revised FY93 Budget Request
Gave Priority to Acquisition Management in FY94
Appointed SES to Lead Training Program

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




          OCTOBER 31, 1994




         ACTIONS COMPLETED
RECOMMENDATION NOi
18
19, 20
23
24
23
26
27
28
29
»>•, - 	 ' 	 *-'. - •• '; l - ' • "«:• - •- - *bN* WS5wl
'ACTIONS COMPLETED ' *•*• *® *~l
Completed revision to Chapter 7, CMM to clarify roles, responsibilities and
limitations of employees performing contract management activities.
09/27/94 Contact: Marilyn Torpey, OAM, 202-260-5019
Completed Training Sessions with Deputy Ethics Officials;
Ethics Orientation Courses given January, April, and July, 1993
Issued revision to Acquisition Manual to specify education requirement for
Procurement Professionals. Contact: William Sanders, OARM/IO, 202-260-3081
Procurement Guidance Documents Indexed, Contact: Ed Murphy, OAM, 202-260-6034
Issued Independent Government Cost Estimates (IGCEs) on June 27, 1994
Contact: Don Hambric, OAM, 202-260-9404
Issue Monthly Contract Management Policy Bulletins
Contact: Ed Murphy. OAM. 260-6034
Identified Procurement Responsibilities in Job Announcements
Contact: Hector Suarez, OHROS, 202-260-3308
Emphasized Contract Management in Performance Agreements
Contact: Hector Suarez. OHROS, 202-260-3308
Described Acquisition Management in Positions Descriptions
Requirements Memorandum Dated: 09/30/92
OHRM Policy and Research Division Advisory 193-1008 Dated: 09/29/92
' Contact: Hector Suarez, OHROS, 202-260-3308

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




        OCTOBER 31, 1994



        ACTIONS COMPLETED
RBCOMMJBUDATION HO, , {
30, 31
33
34
35
36, 38
39
ACTIONS COMPLETED Pa'gft 1 :
Completed the Career Ladder Guide for Project Officers and Policy on Crediting
Extramural Mgmt. Experience. 09/30/94 Contact: Sharon Furrow, OHROS, 202-260-3735
Use IGCEs to Analyze Contractor Costs Contact: Paul Schaffer, 0AM
Policy Memorandum Dated: 03/03/93 • 202-260-9032
Issued Guidance and Training Materials to EPA Training Instructors on the use of
Suspension and Debarment: 08/18/94 Contact: Thomas Sullivan, OHROS, 202-260-1988
Use Other Contract Types: EPA signed pledge to participate in Performance Based
Contracting. Selected pilot in RTF, NC. Contact: Ed Murphy. 0AM 202-260-6034
Enactment of Federal Acquisition Streamlining Act on October 14, 1994 requires
contractors to certify (under possible penalties) that overhead does not include
unallowable costs. Contact: Don Hambric, 0AM 202-260-9404
Adherence to Prompt Pay Act Contact: Doug Barrett, EPA/RTP
Report Issued Dated: 12/17/92 919-541-3041

-------
                                         RESOURCES MANAGEMENT COMMITTEE  REPORT

                                                   OCTOBER 31, 1994

                                                  ACTIONS  IN  PROGRESS
  LEAD
  OFFICE
 ACTIONS IN PROGRESS*  OBJECTIVES
           14    Workforce Planning (Balance
                of Intramural to Extramural
                Resources)
           NEXT ACTION
                                     Final NAPA Report
  DATE
                                11/30/94
    PROJECTED PRODUCT AND
        COMPLETION DAT*
          Final NAPA Report   11/30/94
 OlRM
37  Develop an Integrated Contract
    Management Information System
Implement COOTS, Small
Purchase, and Contract Award
modules into ICMS for HO
12/30/94
Implement Phase I of the
Integrated Contracts
Management System  03/30/96-
  AO
40  Reconcile Personal  Property
    System with  Integrated
    Financial Management System
Monitor USGS implementation of
Federal Financial System Fixed
Assets Subsystem.  Complete
reauirements analysis.
02/28/95
Implement Personal Property
System              06/30/96
  8EB
DETAILEH
21/22  Establish Mandatory
       Training and develop
       training for POs and WANs
Establish target audiences,
training objectives, and
importance ranking
11/15/94
Publish mandatory training
requirements and, issue
strategic training plan
       	03/15/95
  OHROS
32   Evaluate Disciplinary System
Publish "User-Friendly" tools,  12/30/94
guidance and handbook.
          Complete Disciplinary System
          to include table of
          penalties for both 8ES and
          non-SES workforce.
                   	03/01/95

-------
            UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                        WASHINGTON, D.C. 20460



                          OCT  I 4 1994
                                                           OFFICE OF
                                                         ADMINISTRATION
                                                         AND RE SOURCES
                                                          MANAGEMENT
MEMORANDUM

SUBJECT:  Distribution  of  Resource Management Committee (formerly
          Standing  CommTbtee on Contracts Management)  Material
FROM:     June         .  r~*-r^ ~  s  <-  -. — •	—
          Resource Maj^ge^tnent^Cbminittee Staff

TO:       All EPA Libraries


     I am attaching  the  September 30, 1994 update  of the Resource
Management Committee Recommendations.  The monthly report
summarizes the  current status of Actions  in  Progress and
Completed Actions.

Completed Actions;

     In September we completed three more recommendations.  .This
brings the number of completed recommendations  to  31, leaving
nine open recommendations.

     Recommendation  No.  18 - On September 27,  1994,  Chapter 7 of
the  Contracts Management Manual was signed and  is  being prepared
for  printing and distribution.  This revised chapter strengthens
and  clarifies the roles, responsibilities and limitations of
those employees involved in various contract management positions
in the Agency.   The  chapter defines those employees for whom
certification is required and the process for receiving and
renewing the certification.

     Recommendations No. 30 & 31 -  On September 30, we issued
the  Career Ladder Guidance for Project Officers and Policy on
Crediting Extramural Management Experience.    We have also
institutionalized  the process for selecting  and awarding
contracts management awards at the annual EPA award ceremony.
                                                        Recycled/Recyclable
                                                        Printed with Soy/Canola Ink on paper that
                                                        contains at least 50% recycled fiber

-------
                              - 2 -
Actions in Progress;

     We have made progress on several initiatives,  some of which
we expect to complete in the next few months.  For example:

     Recommendation No". 35 -  We are working with the program
offices to identify pilots for the alternative contracting
methods.  We believe that our participation in the Office of
Federal Procurement Policy (OFPP) pilot for using performance-
based contracts will decrease the use of cost-reimbursement
contracts in the Agency.   We are scheduled to sign an agreement
with OFPP within the next few weeks to pilot this program.

     Recommendation No. 14 -  The NAPA Study is nearing
completion.  We-have met with NAPA and commented on their draft
report.  We have extended the contract with NAPA to November 30
at which time we expect a final report.

     Recommendation No'. 36/38 -  The requirements of this
recommendation will be met with the enactment of the Federal
Acquisition Streamlining Act.  This Act imposes penalties on
contractors who claim unallowable costs, including employee
morale and health costs.  EPA has already implemented a
requirement that contractors certify that their claims do not
include unallowable costs.  The Bill is scheduled to be signed by
President Clinton on October 14, 1994.

     In addition to the above recommendations, we have five
recommendations that require longer-term implementation plans
 (i.e., new Integrated Contracts Management System; Personal
Property/IFMS interface; enhanced disciplinary system; and the
resource management training initiative.  We are completing a
plan, with updated milestones, to keep each of these projects on
track until completion.

     I will continue to send you the monthly progress reports for
your information. This document has been sent to the
Administrator, the staffs of Senators Mikulski and Glenn,
Congressmen Dingell and Stokes, and to Rob Fairweather at OMB.
If you have questions, please contact me on  (202) 260-0198.

Attachment

-------
                      MONTHLY STATUS REPORT

   STANDING COMMITTEE ON CONTRACTS MANAGEMENT RECOMMENDATIONS
           (RENAMED THE RESOURCE MANAGEMENT COMMITTEE)


     This monthly Status Report provides an update of progress
made on the forty recommendations in EPA's June 1992 report
Contracts Management at EPA;   Managing Our Mission;
Recommendations of the Standing Committee on Contracts
Management.

     The actions described in this Report address improvements in
EPA's contract management.   Because EPA uses contracts for a wide
range of goods and services,  accountable contracts management is
essential to the overall sound management of the Agency.

     By June 1993, the scope of the Standing Committee on
Contracts Management was expanded to include assistance and
relevant aspects of financial management, as well as acquisition.
The Committee was renamed the Resource Management Committee.
The Status Report is organized into two sections by the current
status of the actions:

     o     -   Actions in Progress:  The approach to these
               actions has been approved and implementation plans
               are underway.

               This chart is organized by lead office.  The chart
               lists the objective, the current status and
               projected product completion date.

     o     -    Completed Actions:  Actions completed with a
               contact point,  if appropriate, for  the final
               product.

     Copies of the June 1992 report and this Status Report are
available  in EPA libraries.  For further  information on the
Resource Management Committee, please contact the  Committee staff
at  (202) 260-0198.

-------
RESOURCES MANAGEMENT COMMITTEE  REPORT




          SEPTEMBER 30, 1994




         ACTIONS IN PROGRESS
LEAD -
OFFICE

OAH-
s

00
OIRH
. AO
SES
DETAILEE
OHROS
ACTIONS IN PROGRESS: OBJECTIVES

35 Use other contract types
36,38 Develop Policy on Indirect
Cost and Seek Amendments to
EPAAR and FAR
14 Workforce Planning (Balance
of Intramural to Extramural
Resources)
37 Develop an Integrated Contract
Management Information System
40 Reconcile Personal Property
System with Integrated
Financial Management System
21/22 Establish Mandatory
Training and develop
training for POs and WANs
32 Evaluate Disciplinary System
NEXT ACTION DATE

Meet with program offices to 10/15/94
discuss pilot and address
their concerns.
Enactment of the Procurement
Reform Dill (Expected in early
October) .
Final NAPA Report 11/30/94
Implement CDOTS, Small 12/30/94
Purchase, and Contract Award
modules into ICMS for HQ
Monitor USGS implementation of 02/28/95
Federal Financial System Fixed
Assets Subsystem. Complete
requirements analysis.
Establish target audiences, 11/15/94
training objectives, and
importance ranking
Circulate final draft of Table 10/31/94
of Penalties to RMC for •
comment. Prepare for Green
Border Review.
PROJECTED PRODUCT AMD1 \
COMPLETION, DATE .. •
•. *•
Institute pilot for
performance based
contracting. 10/30/94
After legislation is enacted
to impose penalties for bad
claims, FAR will be amended.
Final NAPA Report 11/30/94
Implement Phase I of the
Integrated Contracts
Management System 03/30/96
Implement Personal Property
System 06/30/96
Publish mandatory training
requirements and issue
strategic training plan
03/15/95
Complete Disciplinary System
to include table of
penalties for both SES and
non-SES workforce.
03/01/95

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




         SEPTEMBER 30, 1994




         ACTIONS COMPLETED
RECOMMENDATION
Recommendations

6

S





HO.
1-4
5
, 12
7
, 9
10
11
13
15
16
IV
ACTIONS COMPLETED > ......
Reorganized Office of Administration and Resources Management
Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
Contact: Document Distribution Unit, 202-260-8573
Issued Chapter 14 to Contracts Management Manual establishing requirement for
"contracting team" concept for individual contracts from award to close out.
Dated: February 18, 1994 Contact: Paul Schaffer, EPA/OAM 202-260-9032
Establish Senior Resource Officials - EPA Order Signed 3/22/94
Contact: Thelma Adams, OHROS, 202-260-5000
Issued guidance for new FMPIA Process, and the Contracts Management Guiding
Principles, June 6 and June 8, 1994. Contact: Kathy Sedlak-01 Brien 202-260-9650
(FMFIA process) or Tom O'Connell 202-260-8268 (Guiding Principles).
Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
Management Plans for all major contracts.
Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
Acquisition Plans defining contract needs.
Dated: February 18, 1994 Contact: Ed Murphy, EPA/OAM 202-260-6034
Co-located administrative contracting officers with OSWER program managers, project
officers and work assignment managers in Crystal Gateway Building on July 11, 1994.
Contact: Paige Peck, EPA/HQ 202-260-2548
Revised FY93 Budget Request
Gave Priority to Acquisition Management in FY94
Appointed SES to Lead Training Program

-------
                                    RESOURCE MANAGEMENT COMMITTEE REPORT


                                             BEPYEMDER 30,  1994

                                             ACTIONS COMPLETED
 RECOMMENDATION NO.    ACTIONS COMPLETED	     '    Pa9e >2 '

                  18  Completed revision to Chapter 7, CMH to clarify roles, responsibilities and
                      limitations of employees performing contract management activities.
	   09/27/94	Contact;  Marilyn Torpey, QAM, 202-260-5019

              19,  20  Completed Training Sessions with Deputy Ethics Officials;
	Ethics Orientation Courses given January,  April,  and July,  1993	

                  23  Issued revision to Acquisition Manual to specify education requirement for
	Procurement Professionals.	contact;   William Sanders,  OARM/IO,  202-26Q~3Q81

	24  Procurement Guidance Documents Indexed, Contact:   Ed Murphy,   QAM,  202-260-6034

                  25  Issued Independent Government Cost Estimates (IGCEs) on June 27,  1994
	Contact:   Don Hambric, QAM, 202-260-9404

                  26  Issue Monthly Contract Management Policy Bulletins
	     Contact:   Ed Murphy,  QAM,  260-6034	

                  27  Identified Procurement Responsibilities in Job Announcements
                                                      	Contact:   Hector Suarez,  OHROS,  202-260~3308

                  28  Emphasized Contract Management in Performance Agreements
	Contact;   Hector Suarez,  OHROS,  202-260~3308

                  29  Described  Acquisition Management in Positions  Descriptions
                      Requirements Memorandum Dated:   09/30/92
                      OHRM  Policy and Research Division Advisory fl93-1008   Dated:   09/29/92
                                                           Contact:   Hector Suarez,  OHROS,  202-260^3308

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




        SEPTEMBER 30, 1994




         ACTIONS COMPLETED
RECOMMENDATION
30



NO.
, 31
33
34
39
ACTIONS COMPLETED 'f*<36 3
Completed the Career Ladder Guide for Project Officers and Policy on Crediting
Extramural Mgmt. Experience. 09/30/94 Contact: Sharon Furrow, OHROS, 202-260-3735
Use IGCEs to Analyze Contractor Costs Contact: Paul Schaffer, 0AM
Policy Memorandum Dated: 03/03/93 202-260-9032
Issued Guidance and Training Materials to EPA Training Instructors on the use of
Suspension and Debarment: 08/18/94 Contact: Thomas Sullivan, OHROS, 202-260-1988
Adherence to Prompt Pay Act Contact: Doug Barrett, EPA/RTP
Report Issued Dated: 12/17/92 919-541-3041

-------
              UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                         WASHINGTON, D.C. 20460
                                                            OFFICE OF
                                                          ADMINISTRATION
                                                          ANDRESOURCES
                                                           MANAGEMENT
MEMORANDUM

SUBJECT:  Distribution of  Resource Management Committee  (formerly
          Standing Committee  on Contracts Management) Material

FROM:     June Mackey
          Resource Ma

TO:       All EPA Libraries
                               Committee St
     I am attaching the August  31,  1994 update of the Resource
Management Committee Recommendations.   The monthly report
summarizes the current status of  Actions in Progress and
Completed Actions.

     During August we completed Recommendation No 34.  We
distributed to Agency Training  Coordinators,  a suspension and
debarment module to include  in  contracts management training
courses.   Additionally, we  are. distributing a fact sheet to all
Senior Resource Officials•that  explains services available  in the
Suspension and Debarment Division when dealing with grantee non-
performance or fraud, waste, and  abuse.

     Beginning this month, we will combine Recommendations  Nos.
21 and 22 in our monthly status report.  These two training
recommendations are closely  related and are on the same track for
completion.   We are making  good  progress on our contracts
management training initiative  and have expanded the program to
cover all areas of resources management.   We have completed the
strategic training plan and  a draft compendium of courses which
is currently being reviewed  by  our Senior Resource Officials.

     I will continue to send you  the monthly progress reports for
your information. This document has been sent to the
Administrator, the staffs  of Senators Mikulski and Glenn,
Congressmen Dingell and Stokes, and to Rob Fairweather at OMB.
If you have questions, please contact me on (202)260-0198.
Attachment
                                                       Recycled/Recyclable
                                                       Pflntcd wntiSaylCanala Ink on paper f
                                                       oontBliu M le>M SO* recycled flber

-------
                      MONTHLY STATUS REPORT

   STANDING COMMITTEE ON CONTRACTS MANAGEMENT RECOMMENDATIONS
           (RENAMED THE RESOURCE MANAGEMENT COMMITTEE)


     This monthly Status Report provides an update of progress
made on the forty recommendations in EPA's June 1992 report
Contracts Management at EPA:  Managing Our Mission;
Recommendations of the Standing Committee on Contracts
Management.

     The actions described in this Report address improvements in
EPA's contract management.   Because EPA uses contracts for a wide
range of goods and services, accountable contracts management is
essential to the overall sound management of the Agency.

     By June 1993, the scope of the Standing Committee on
Contracts Management was expanded to include assistance and
relevant aspects of financial management, as well as acquisition.
The Committee was renamed the Resource Management Committee.
The Status Report is organized into two sections by the current
status of the actions:

     o     -   Actions in Progress:  The approach to these
               actions has been approved and implementation plans
               are underway.

               This chart is organized by lead office.  The chart
               lists the objective, the current status and
               projected product completion date.

     o    -    Completed Actions:  Actions completed with a
               contact point, if appropriate, for the final
               product.

     Copies of the June 1992 report and this Status Report are
available in EPA libraries.  For further information on the
Resource Management Committee, please contact the Committee staff
at (202) 260-0198.

-------
ACTIONS IN PROGRESS:  OBJECTIVES
NEXT ACTION
DATE
PROJECTED PRODUCT AMD
    COMPLBTIOM DAT*
8E8
DETAILBB
OHRK

21/22 Establish Mandatory
Training for POs and
Managers and develop
Training Courses for POs
and WANs.
30,31 Career Track/Grade
Structure/Awards
32 Evaluate Disciplinary System
Establish target audiences, 11/15/94
training objectives, and
importance ranking
RMC -comments incorporated into 09/30/94
final Guidance
Incorporate RMC comments into 09/30/94
Table of Penalties before
sending through Green Border
Rev iew .
Publish mandatory training
requirements and issue
strategic training plan
03/15/95
Issue final package for
implementation 09/30/94
Implement Revised
Disciplinary System to
include general workforce.

-------
RESOURCES MANAGEMENT COMMITTEE REPORT




           AUGUST 31, 1994




         ACTIONS IN PROGRESS
LEAD '
OFFICE
0A*
QC
OIRK
AO
ACTIONS IN PROGRESS 1 OBJECTIVES
18 Certification of Agency
Project Officers
35 Use other contract types
36,38 Develop Policy on Indirect
Cost and Seek Amendments to
EPAAR and FAR
14 Workforce Planning (Balance
of Intramural to Extramural
Resources )
37 Develop an Integrated Contract
Management Information System
40 Reconcile Personal Property
System with Integrated
Financial Management System
NEXT ACTION DATE
Revised Chapter 7 to AA/OARM 09/10/94
for signature.
Recommend to RMC that the OFPP
pilot on performance based
contracting be used to
implement this recommendation.
Soliciting comments from the 09/20/94
RMC (due 09/20/94).
Enactment of the Procurement
Reform Bill (Conference Report
issued) .
NAPA final draft received and
undergoing Agency review.
Demonstration of Electronic 09/30/94
Commerce for Small Purchases.
Monitor USGS implementation of 02/28/95
Federal Financial System Fixed
Assets Subsystem. Complete
requirements analysis.
PROJECTED PRODUCT AND
COMPLETION DATE ,
f
Issue Revised Chapter 7 of
CMM 09/30/94
Institute pilot for
performance based
contracting 09/30/94
After legislation is enacted
to impose penalties for bad
claims, FAR/EPAAR will be
amended.
Final NAPA Report 09/30/94
Functional prototype
completed 09/30/94
Implement Personal Property
System 06/30/96

-------
                                   RESOURCE MANAGEMENT COMMITTEE REPORT

                                             AUGUST  31,  1994

                                            ACTIONS  COMPLETED
RECOMMENDATION MO,   ACTIONS COMPLETED
             19, 20  Completed Training Sessions with Deputy Ethics Officials;
                     Ethics Orientation Courses given January, April, and July, 1993 _

                 23  Issued revision to Acquisition Manual to specify education requirement for
                     Procurement Professionals. _ Contact;  William Sanders, 202-260-3081 _

                 24  Procurement Guidance Documents Indexed, Contact:  Ed Murphy,  QAM, 202-260-6034 _

                 26  Issue Monthly Contract Management Policy Bulletins, Contact;  Ed Murphy,  260-6034

                 27  Identified Procurement Responsibilities in Job Announcements _

                 28  Emphasized Contract Management in Performance Agreements _

                 29  Described Acquisition Management in Positions Descriptions
                     Requirements Memorandum i Dated:  09/30/92
                     OHRM Policy and Research Division Advisory #93-1008  Dated:  09/29/92
                                                             i   Contact;  Hector E. Suarez, 202-260-3308

                 33  Use IGCEs to Analyze Contractor Costs       Contact:  Paul Schaffer, EPA/HQ
                     Policy Memorandum Dated:  03/03/93 _ 202-260-9032 _

                 34  Issued Guidance and Training Materials to EPA Training Instructors on the use of
                     Suspension and Debarment:  08/18/94 _ Contact;  Thomas Sullivan,  202-260-1988 _

                 39  Adherence to Prompt Pay Act               Contact:  Dennis Schur, EPA/RTP
                     Report Issued Dated;  12/17/92 _ . _ 919-541-3041 _

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




          AUGUST  31,  1994




         ACTIONS  COMPLETED
RECOMMENDATION NO.
Recommendations 1-4
5
6, 12
7
8, 9
10
11
13
15
16
17
ACTIONS COMPLETED
Reorganized Office of Administration and Resources Management
Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
Contact: Document Distribution Unit, 202-260-8573
Issued Chapter 14 to Contracts Management Manual establishing requirement for
"contracting team" concept for individual contracts from award to close out.
Dated: February 18, 1994 Contact: Paul Schaffer, EPA/OAM 202-260-9032
Establish Senior Resource Officials - EPA Order Signed 3/22/94
Issued guidance for new FMFIA Process, and the Contracts Management Guiding
Principles, June 6 and June 8, 1994. Contact: Kathy Sedlak-O'Brien 202-260-9650
(FMFIA process) or Don Hambric 202-260-9404 (Guiding Principles).
i
Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
Management Plans for all major contracts.
Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
Acquisition Plans defining contract needs.
Dated: February 18, 1994 Contact: Fifi Good fellow, EPA/OAM 202-260-6000
Co-located administrative contracting officers with OSWER program managers, project
officers and work assignment managers in Crystal Gateway Building on July 11, 1994.
Contact: Paige Peck, EPA/HQ 202-260-2548
Revised FY93 Budget Request ,
Gave Priority to Acquisition Management in FY94
Appointed SES to Lead Training Program

-------
               UNITED STATES ENVIRONMENTAL PHOTECTION AGENCY
                          WASHINGTON. D.C. 20460
                             SEP -6  1994
                                                            OFFICE OF
                                                          ADMtNISTFtATION
                                                          AND RESOURCES
                                                           MANAGEMENT


MEMORANDUM

SUBJECT:  Distribution  of  Resource Management Committee  (formerly
          Standing Comjsri^tee on Contracts Management) Material

FROM:     June Mackey'
          Resource Mar)^eTneiW Committee ~Stc

TO:       All EPA Libraries              ^


     I am attaching the August 31, 1994 update of the Resource
Management Committee  Recommendations.   The monthly report
summarizes the current  status of Actions in Progress and
Completed Actions.

     During August we completed Recommendation No 34.  We
distributed to Agency Training Coordinators, a suspension  and
debarment module to include  in contracts management training
courses.   Additionally, we~ are. distributing a fact sheet  to all
Senior Resource Officials•that explains services available in the
Suspension and Debarment Division when dealing with grantee  non-
performance or fraud, waste,  and abuse.

     Beginning this month, we will combine Recommendations Nos.
21 and 22 in our monthly status report.  These two training
recommendations are closely  related and are on the same  track for
completion.   We are  making  good progress on our contracts
management training initiative and have expanded the program to
cover all areas of resources management.   We have completed the
strategic training plan and  a draft compendium of courses  which
is currently being reviewed  by our Senior Resource Officials.

     I will continue  to send you the monthly progress reports for
your information. This  document has been sent to the
Administrator, the staffs  of Senators Mikulski and Glenn,
Congressmen Dingell and Stokes, and to Rob Fairweather at  OMB.
If you have questions,  please contact me on (202)260-0198.


Attachment
                                                       Recycled/Recyclable
                                                       Printed with Sey/CanoU Ink on pvper thai
                                                       contains at lea* 50% recycled flbsr

-------
                      MONTHLY STATUS REPORT

    STANDING  COMMITTEE ON CONTRACTS MANAGEMENT RECOMMENDATIONS
           (RENAMED THE RESOURCE MANAGEMENT COMMITTEE)


     This monthly Status Report provides an update of progress
made on the forty recommendations in EPA's June 1992 report
Contracts Management at EPA:  Managing Our Mission;
Recommendations of the Standing Committee on Contracts
Management.

     The actions described in this Report address improvements in
EPA's contract management.   Because EPA uses contracts for a wide
range of goods and services, accountable contracts management is
essential to the overall sound management of the Agency.

     By June 1993, the scope of the Standing Committee on
Contracts Management was expanded to include assistance and
relevant aspects of financial management, as well as acquisition.
The Committee was renamed the Resource Management Committee.
The Status Report is organized into two sections by the current
status of the actions:

     o     -   Actions in Progress:   The approach to these
               actions has been approved and implementation plans
               are underway.

               This chart is organized by lead office.  The chart
               lists the objective,  the current status and
               projected product completion date.

     o    -    Completed Actions:  Actions completed with a
               contact point, if appropriate, for the final
               product.

     Copies of the June 1992 report and this Status Report are
available in EPA libraries.  For further information on the
Resource Management Committee, please contact the Committee staff
at  (202) 260-0198.

-------
LEAD
OFFICE
ACTIONS IN PROGRESS:  OBJECTIVES
NEXT ACTION
DATE
PROJECTED PRODUCT AMD
    COMPLETION DATE .
SEfl
DETAItBB
OHRM
21/22 Establish Mandatory
Training for POs and
Managers and develop
Training Courses for POs
and WAMs.
30,31 Career Track/Grade
Structure/ Awards
32 Evaluate Disciplinary System
Establish target audiences, 11/15/94
training objectives, and
importance ranking
RMC • comments incorporated into 09/30/94
final Guidance
Incorporate RMC comments into 09/30/94
Table of Penalties before
sending through Green Border
Review.
Publish mandatory training
requirements and issue
strategic training plan
03/15/95
Issue final package for
implementation 09/30/94
Implement Revised
Disciplinary System to
include general workforce.

-------
RESOURCES MANAGEMENT COMMITTEE REPORT




           AUGUST 31, 1994




         ACTIONS IN PROGRESS
LEAD
OFFICE
DA*
0C
OIRH
AO
ACTIONS IN PROGRESS! OBJECTIVES
18 Certification of Agency
Project Officers
35 Use other contract types
36,38 Develop Policy on Indirect
Cost and Seek Amendments to
EPAAR and FAR
14 Workforce Planning (Balance
of Intramural to Extramural
Resources)
37 Develop an Integrated Contract
Management Information System
40 Reconcile Personal Property
System with Integrated
Financial Management System
NEXT ACTION DATE
Revised Chapter 7 to AA/OARM 09/10/94
for signature.
Recommend to RMC that the OFPP
pilot on performance based
contracting be used to
implement this recommendation.
Soliciting comments from the 09/20/94
RMC (due 09/20/94).
Enactment of the Procurement
Reform Bill (Conference Report
issued) .
NAPA final draft received and
undergoing Agency review.
Demonstration of Electronic 09/30/94
Commerce for Small Purchases.
Monitor USGS implementation of 02/28/95
Federal Financial System Fixed
Assets Subsystem. Complete
requirements analysis.
PROJECTED PRODUCT AND
COMPLB*IOH DATE
Issue Revised Chapter 7 of
CMM 09/30/94
institute pilot for
performance based
contracting 09/30/94
After legislation is enacted
to impose penalties for bad
claims, FAR/EPAAR will be
amended.
Final NAPA Report 09/30/94
Functional prototype
completed 09/30/94
Implement Personal Property
System 06/30/96

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




           AUGUBT  31,  1994




         ACTIONS  COMPLETED
RECOMMENDATION MO.
19, 20
23
24
26
27
28
29
33
34
39
ACTIONS COMPLETED **** »
Completed Training Sessions with Deputy Ethics Officials;
Ethics Orientation Courses qiven January, April, and July, 1993
Issued revision to Acquisition Manual to specify education requirement for
Procurement Professionals. Contact: William Sanders, 202-260-3081
Procurement Guidance Documents Indexed, Contact: Ed Murphy, ' OAM, 202-260-6034
Issue Monthly Contract Management Policy Bulletins, Contact: Ed Murphy. 260-6034
Identified Procurement Responsibilities in Job Announcements
Emohasized Contract Management in Performance Agreements
Described Acquisition Management in Positions Descriptions
Requirements Memorandum • Dated: 09/30/92
OHRM Policy and Research Division Advisory #93-1008 Dated: 09/29/92
Contact: Hector E. Suarez, 202-260-3308
Use IGCEs to Analyze Contractor Costs contact: Paul Schaffer, EPA/KQ
Policy Memorandum Dated: 03/03/93 202-260-9032
Issued Guidance and Training Materials to EPA Training Instructors on the use of
Susoension and Debarment: 08/18/94 Contact: Thomas Sullivan, 202-260-1988
Adherence to Prompt Pay Act Contact: Dennis Schur, EPA/RTF
Report Issued Dated: 12/17/92 . 919-541-3041

-------
RESOURCE MANAGEMENT COMMITTEE REPORT
          AUGUST  31,  1994
         ACTIONS COMPLETED
RECOMMENDATION NO.
Recommendations 1-4
5
6, 12
7
8, 9
10
11
13
15
16
17
ACTIONS COMPLETED
Reorganized Office of Administration and Resources Management
Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
Contact: Document Distribution Unit, 202-260-8573
Issued Chapter 14 to Contracts Management Manual establishing requirement for
"contracting team" concept for individual contracts from award to close out.
Dated: February 18, 1994 Contact: Paul Schaffer, EPA/OAM 202-260-9032
Establish Senior Resource Officials - EPA Order Signed 3/22/94
Issued guidance for new FMFIA Process, and the Contracts Management Guiding
Principles, June 6 and June 8, 1994. Contact: Kathy Sedlak-O'Brien 202-260-9650
(FMFIA process) or Don Hambric 202-260-9404 (Guiding Principles).
Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
Management Plans for all major contracts.
Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
Acquisition Plans defining contract needs.
Dated: February 18, 1994 Contact: Fifi Goodfellow, EPA/OAM 202-260-6000
Co-located administrative contracting officers with OSWER program managers, project
officers and work assignment managers in Crystal Gateway Building on July 11, 1994.
Contact: Paige Peck, EPA/HQ 202-260-2548
Revised FY93 Budget Request f
Gave Priority to Acquisition Management in FY94
Appointed SES to Lead Training Program

-------
               UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                          WASHINGTON, D.C. 20460
                            ADG1H994
                                                            OFFICE OF
                                                          ADMINISTRATION
                                                          AND RE SOURCES
                                                           MANAGEMENT


MEMORANDUM

SUBJECT:  Distribution  of Resource Management Committee  (formerly
          Standing Committee on Contracts Management) Material

FROM:     June Mackej        	
          Resource Mcuf«^e'meht~~Committee~StafJ

TO:       All EPA Libraries


     I am attaching  the July 31, 1994 update of the Resource
Management Committee Recommendations.  The monthly report
summarizes the current  status of Actions in Progress and
Completed Actions.

     On July 11, 1994,  we began a three-year pilot to co-locate
Contracting Officers and Contract Specialists from the Office of
Acquisition Management  (OAM)  with program office staff from  the
Office of Solid Waste and Emergency Response (OSWER).  The
relocation of ten employees from the Fairchild Building  to the
Crystal Gateway Building will enable OAM contracting staff to
directly interact with  program managers, project officers, and
work assignment managers.  We will review progress every six
months and OAM and OSWER will issue an annual report on  the
pilot.  This pilot responds to Resource Management Committee
Recommendation No. 13.

     I will continue to send you the monthly progress reports for
your information. This  document has been sent to the
Administrator, the staffs of Senators Mikulski and Glenn,
Congressmen Dingell  and Stokes, and to Rob Fairweather at OMB.
If you have questions,  please contact me on (202)260-0198.


Attachment
                                                       Recycled/Recyclable
                                                       Printed with Soy/Canola Ink on paper that
                                                       contains at least 50% recycled fiber

-------
                          STATUS REPORT

    STANDING  COMMITTEE ON CONTRACTS MANAGEMENT RECOMMENDATIONS
     This monthly Status Report provides an update of progress
made on the forty recommendations in EPA's June 1992 report
Contracts Management at EPA;  Managing Our Mission;
Recommendations of the Standing Committee on Contracts
Management.

     The actions described in this Report address improvements in
EPA's contract management.  Because EPA uses contracts for a wide
range of goods and services, accountable contracts management is
essential to the overall sound management of the Agency.

     By June 1993, the scope of the Standing Committee on
Contracts Management was expanded to include assistance and
relevant aspects of financial management, as well as acquisition.
The Committee was renamed the Resource Management Committee.
The Status Report is organized into two sections by the current
status of the actions:

     o     -   Actions in Progress:  The approach to these
               actions has been approved and implementation plans
               are underway.

               This chart is organized by lead office.  The chart
               lists the objective, the current status and
               projected product completion date.

     o    -    Completed Actions:  Actions completed with a
               contact point, if appropriate, for the final
               product.

     Copies of the June 1992 report and this Status Report are
available in EPA libraries.  For further information on the
Resource Management Committee, please contact the Committee staff
at (202) 260-0198.

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




           JDLY 31,  1994




        ACTIONS IN PROGRESS
LEAD
OFFICE
OAK
OC
OlftM
AO
ACTIONS 111 PttttifiBSS* OBJECTIVES
18 Certification of Agency
Project Officers
35 Use other contract types
36,38 Develop Policy on Indirect
Cost and Seek Amendments to
EPAAR and FAR
14 Workforce Planning (Balance
of Intramural to Extramural
Resources)
37 Develop an Integrated Contract
Management Information System
40 Reconcile Personal Property
System with Integrated
Financial Management System
HBXT ACTION DATE
Issue Revised Chapter 7, 08/30/94
Contracts Management Manual
0AM and OAR/OAQPS working 08/30/94
toward resolving issues before
proceeding with pilot in
OAQPS .
EPA/OAM is working with FAR
Council on continual basis to
explore alternative approaches
to amend FAR requirements for
cost principles for employee
morale costs.
NAPA to provide final draft to 08/30/94
EPA for comments in August.
Contracts Delivery Order 08/15/94
Tracking System (COOTS)
interface w/IFMS 6 EPAS
Monitor USGS implementation of 02/28/95
Federal Financial System Fixed
Assets Subsystem. Complete
requirements analysis.
PROJECTED PRODUCT AND
COMPLETION DAT*
Issue Revised Chapter 7 of
CMM 08/30/94
Institute Pilot for awarding
multiple contracts with
identical statement of work.
09/30/94
After legislation is enacted
to impose penalties lor bad
claims, FAR/EPAAR will be
amended (could be as late as
Dec. 95) .
Final NAPA Report 09/15/94
Functional prototype
completed 09/30/94
Implement Personal Property
System 06/30/96

-------
LEAD
omc*
ACTION I» WKWRBBSt OWBCftVES
MS** ACTION DATE
PROJECTED PRODUCT AMD
COMPtBTlO* DAW!
flBfl
*B*A*t8B
OttftM
21 Establish Mandatory
Training for all POs,
Managers, and SESs
22 Develop Training Course
for Project Of fleers (POs) and
Work Assignment Mgrs(WAMs)
34 Educate Contract Personnel on
Use of Procurement Sanctions
30,31 Career Track/Grade
Structure/Awards
32 Evaluate Disciplinary System
Complete Strategic Training 08/15/94
Plan
Establish target audiences, 11/15/94
training objectives, and
importance ranking
Incorporate module on 09/01/94
suspension and debarment into
the Lesson Plan.
Career Ladder Guidance and 08/23/94
Policy approved by BMC
Incorporate EPA Order and SES 08/15/94
Discipline Policy into Agency
Disciplinary System.
Issue Strategic Training
Plan 08/15/94
Issue final plan for meeting
training objectives
02/15/95
Issue revised guidance in
Contracts Management Manual
09/01/94
Issue final package for
implementation 08/30/94
Implement Revised
Disciplinary System.
08/30/94

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




           JULY 31,  1994




         ACTIONS COMPLETED
RECOMMENDATION HO.
Recommendations 1-4
5
6, 12
7
8, 9
10
11
13
15
16
17
ACTIONS COMPLETED
Reorganized Office of Administration and Resources Management
Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
Contact: Document Distribution Unit, 202-260-8573
Issued Chapter 14 to Contracts Management Manual establishing requirement for
"contracting team" concept for individual contracts from award to close out.
Dated: February 18, 1994 Contact: Paul Schaffer, EPA/OAM 202-260-9032
Establish Senior Resource Officials - EPA Order Signed 3/22/94
Issued guidance for new FMFIA Process, and the Contracts Management Guiding
Principles, June 6 and June 8, 1994. Contact: Kathy Sedlak-O' Brien 202-260-9650
(FMFIA process) or Don Hambric 202-260-9404 (Guiding Principles) .
Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
Management Plans for all major contracts.
Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
Acquisition Plans defining contract needs.
Dated: February 18, 1994 Contact: Fifi Goodfellow, EPA/OAM 202-260-6000
Co-located administrative contracting officers with OSWER program managers, project
officers and work assignment managers in Crystal Gateway Building on July 11, 1994.
Contact: Paiqe Peck, EPA/HQ 202-260-2548
Revised FY93 Budget Request
Gave Priority to Acquisition Management in FY94
Appointed SES to Lead Training Program

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




           JULY  31,  1994




         ACTIONS COMPLETED
RECOMMENDATION MO.
19, 20
23
24
26
27
28
29
33
39
ACTIONS COMBUSTED 9&9* 2
Completed Training Sessions with Deputy Ethics Officials;
Ethics Orientation Courses given January, April, and July, 1993
Issued revision to Acquisition Manual to specify education requirement for
Procurement Professionals. Contact: William Sanders, 202-260-3081
Procurement Guidance Documents Indexed, Contact: Ed Murphy, OAM, 202-260-6034
Issue Monthly Contract Management Policy Bulletins, Contact: Ed Murphy, 260-6034
Identified Procurement Responsibilities in Job Announcements
Emphasized Contract Management in Performance Agreements
Described Acquisition Management in Positions Descriptions
Requirements Memorandum Dated: 09/30/92
OHRM Policy and Research Division Advisory #93-1008 Dated: 09/29/92
Contact: Hector E. Suarez, 202-260-3308
Use IGCEs to Analyze Contractor Costs Contact: Paul Schaffer, EPA/HQ
Policy Memorandum D».ted: 03/03/93 202-260-9032
Adherence to Prompt Pay Act Contact: Dennis Schur, EPA/RTP
Report Issued Dated: 12/17/92 919-541-3041

-------
              UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                          WASHINGTON. D.C. 20460
                            AUG1H994
                                                            OFFICE OF
                                                          ADMINISTRATION
                                                          AND RE SOURCES
                                                           MANAGEMENT
MEMORANDUM

SUBJECT:  Distribution  of Resource Management Committee  (formerly
          Standing Cpiflarittee on Contracts Management) Material
FROM:     June
          Resource Management Committee Staf

TO:       All EPA Libraries


     I am attaching  the July 31,  1994 update of the Resource
Management Committee Recommendations.  The monthly report
summarizes the current  status of  Actions in Progress and
Completed Actions.

     On July 11, 1994,  we began a three-year pilot to co-locate
Contracting Officers and Contract Specialists from the  Office of
Acquisition Management  (OAM)  with program office staff  from the
Office of Solid Waste and Emergency Response (OSWER) .   The
relocation of ten employees from  the Fairchild Building to the
Crystal Gateway Building will enable OAM contracting staff to
directly interact with  program managers, project officers,  and
work assignment managers.   We will review progress every six
months and OAM and OSWER will issue an annual report on the
pilot.  This pilot responds to Resource Management Committee
Recommendation No. 13.

     I will continue to send you  the monthly progress reports for
your information. This  document has been sent to the
Administrator, the staffs of Senators Mikulski and Glenn,
Congressmen Dingell  and Stokes, and to Rob Fairweather  at  OMB.
If you have questions,  please contact me on (202)260-0198.


Attachment
                                                       Recycled/Recyclable
                                                       Printed with Soy/Canota Ink on paper thai
                                                       contains at least 50% recycled fiber

-------
                          STATUS REPORT

    STANDING COMMITTEE ON CONTRACTS MANAGEMENT RECOMMENDATIONS
     This monthly Status Report provides an update of progress
made on the forty recommendations in EPA's June 1992 report
Contracts Management at EPA;  Managing Our Mission;
Recommendations of the Standing Committee on Contracts
Management.

     The actions described in this Report address improvements in
EPA's contract management.  Because EPA uses contracts for a wide
range of goods and services, accountable contracts management is
essential to the overall sound management of the Agency.

     By June 1993, the scope of the Standing Committee on
Contracts Management was expanded to include assistance and
relevant aspects of financial management, as well as acquisition.
The Committee was renamed the Resource Management Committee.
The Status Report is organized into two sections by the current
status of the actions:

     o     -   Actions in Progress:  The approach to these
               actions has been approved and implementation plans
               are underway.

               This chart is organized by lead office.  The chart
               lists the objective, the current status and
               projected product completion date.

     o    -    Completed Actions:  Actions completed with a
               contact point, if appropriate, for the final
               product.

     Copies of the June 1992 report and this Status Report are
available in EPA libraries.  For further information on the
Resource Management Committee, please contact the Committee staff
at (202) 260-0198.

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




           JULY  31,  1994




        ACTIONS  IN PROGRESS
LEAD
OFFICE
OAK
6C
OIRM
AO
ACTIONS IN PROdRBSSI OBJECTIVES
18 Certification of Agency
Project Officers
35 Use other contract types
36,38 Develop Policy on Indirect
Cost and Seek Amendments to
EPAAR and FAR
14 Workforce Planning (Balance
of Intramural to Extramural
Resources)
37 Develop an Integrated Contract
Management Information System
40 Reconcile Personal Property
System with Integrated
Financial Management System
NEXT ACTION DATS
Issue Revised Chapter 7, 08/30/94
Contracts Management Manual
0AM and OAR/OAQPS working 08/30/94
toward resolving issues before
proceeding with pilot in
OAQPS.
EPA/OAM is working with FAR
Council on continual basis to
explore alternative approaches
to amend FAR requirements for
cost principles for employee
morale costs.
NAPA to provide final draft to 08/30/94
EPA for comments in August.
Contracts Delivery Order 08/15/94
Tracking System (CDOTS)
interface w/IFMS & EPAS
Monitor USGS implementation of 02/28/95
Federal Financial System Fixed
Assets Subsystem. Complete
requirements analysis.
PROJECTED PRODUCT AND
COMPLETION DATE
Issue Revised Chapter 7 of
CMM 08/30/94
Institute Pilot for awarding
multiple contracts with
identical statement of work.
09/30/94
After legislation is enacted
to impose penalties for bad
claims, FAR/EPAAR will be
amended (could be as late as
Dec. 95) .
Final NAPA Report 09/15/94
Functional prototype
completed 09/30/94
Implement Personal Property
System 06/30/96

-------
LEAD
OFFICE
ACT10MB 18 WWWJRESB!  OBJECTIVES
NEXT ACtlON
PROJECTED PRODUCT AMD
    COMPLEf10« DAI'S
flEB
DB*A11EK

OttfM
21 Establish Mandatory
Training for all POs,
Managers, and SESs
22 Develop Training Course
for Project Of fleers (POs) and
Work Assignment Mgrs(WAMs)
34 Educate Contract Personnel on
Use of Procurement Sanctions
30,31 Career Track/Grade
Structure/ Awards
32 Evaluate Disciplinary System
Complete Strategic Training 08/15/94
Plan
Establish target audiences, 11/15/94
training objectives, and
importance ranking
Incorporate module on 09/01/94
suspension and debarment into
the Lesson Plan.
Career Ladder Guidance and 08/23/94
Policy approved by RMC
Incorporate EPA Order and SES 08/15/94
Discipline Policy into Agency
Disciplinary System.
Issue Strategic Training
Plan 08/15/94
Issue final plan for meeting
training objectives
02/15/95
Issue revised guidance in
Contracts Management Manual
09/01/94
Issue final package for
implementation 08/30/94
Implement Revised
Disciplinary System.
08/30/94

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




           JULY  31,  1994




         ACTIONS COMPLETED
RECOMMENDATION HO.
Recommendations 1-4
5
6, 12
7
8, 9
10
11
13
15
16
17
ACTIONS COMPLETED
Reorganized Office of Administration and Resources Management
Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
Contact: Document Distribution Unit, 202-260-8573
Issued Chapter 14 to Contracts Management Manual establishing requirement for
"contracting team" concept for individual contracts from award to close out.
Dated: February 18, 1994 Contact: Paul Schaffer, EPA/OAM 202-260-9032
Establish Senior Resource Officials - EPA Order Signed 3/22/94
Issued guidance for new FMFIA Process, and the Contracts Management Guiding
Principles, June 6 and June 8, 1994. Contact: Kathy Sedlak-O'Brien 202-260-9650
(FMFZA process) or Don Hambric 202-260-9404 (Guiding Principles) .
Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
Management Plans for all major contracts.
Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
Acquisition Plans defining contract needs.
Dated: February 18, 1994 Contact: Fifi Goodfellow, EPA/OAM 202-260-6000
Co-located administrative contracting officers with OSWER program managers, project
officers and work assignment managers in Crystal Gateway Building on July 11, 1994.
Contact: Paige Peck, EPA/HQ 202-260-2548
Revised FY93 Budget Request
Gave Priority to Acquisition Management in FY94
Appointed SES to Lead Training Program

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




           JULY  31,  1994




         ACTIONS COMPLETED
RECOMMENDATION MO.
19, 20
23
24
26
27
28
29
33
39
ACTIONS COMPLETED P&9*
Completed Training Sessions with Deputy Ethics Officials;
Ethics Orientation Courses given January, April, and July, 1993
Issued revision to Acquisition Manual to specify education requirement for
Procurement Professionals. Contact: William Sanders, 202-260-3081
Procurement Guidance Documents Indexed, Contact: Ed Murphy, OAM, 202-260-6034
2



Issue Monthly Contract Management Policy Bulletins, Contact: Ed Murphy, 260-6034
Identified Procurement Responsibilities in Job Announcements
Emphasized Contract Management in Performance Agreements


Described Acquisition Management in Positions Descriptions
Requirements Memorandum Dated: 09/30/92
OHRM Policy and Research Division Advisory #93-1008 Dated: 09/29/92
Contact: Hector E. Suarez, 202-260-3308
Use IGCEs to Analyze Contractor Costs Contact: Paul Schaffer, EPA/HQ
Policy Memorandum Dated: 03/03/93 202-260-9032
Adherence to Prompt Pay Act Contact: Dennis Schur, EPA/RTP
Report Issued Dated: 12/17/92 919-541-3041



-------
             UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                        WASHINGTON, D.C. 20460
                                      JUL 21 68ft
                                                           OFFICE OF
                                                         ADMINISTRATION
                                                         AND RESOURCE 5
                                                          MANAGEMENT
MEMORANDUM

SUBJECT:  Distribution of Resource Management Committee  (formerly
          Standing Committee  on  Contracts Management) Material
                              Ts&L^&^Ys^"
                               Committee S£arf
FROM:      June
          Resource   , ,  _

TO:       All EPA L!Tbraries


     I am attaching  the June  30,  1994  update of the Resource
Management Committee Recommendations.   The monthly report
summarizes the current  status of  actions in two categories:
Actions in Progress  and Completed Actions.  During June, we
completed four recommendations.

I    Recommendation  Nos 8  & 9;  On June 6, 1994, OARM announced
     the reengineered Management  Integrity Program and the FY
     1994 Management Integrity Guidance.  The new integrity
     guidance .states that  managers are expected to address
     program vulnerabilities  while making planning, budgeting,
     and evaluation  decisions.  The new process tangibly
     demonstrates the Agency's strong  commitment to the National
     Performance Review.   It  eliminates paper-intensive processes
     and simplifies  formal reporting requirements.  This will
     reduce work-hours  devoted to administrative reporting by
     more than fifty percent.

     As a tool for SROs to use in complying with the newly
     streamlined management integrity  process, OARM issued the
     Contracts Management  Guiding Principles on June 8, 1994.
     These Principles integrate core integrity concepts into
     existing procurement  policies, regulations and procedures.

8    Recommendation  No. 23:   On June 24, 1994, OARM issued a
     revised chapter to the Agency Acquisition Manual to upgrade
     the education requirements for Procurement Professionals.
     This is one element of the Agency's effort to establish a
     comprehensive training and education program to improve
     contracts management. We are also continuing our effort to
     implement other training recommendations.

                                                      Recycled/Recyclable
                                                      Printed with Soy/Canola Ink on paper that
                                                      contains at least 50% recycled liber

-------
                               -2-

g    Recommendation No.  25:  On June 27, 1994, OARM published the
     Independent Government Cost Estimates Guide.  This Guide
     will be used to assist in developing independent government
     cost estimates and  determine the reasonableness of
     contractors' proposals.

     We will continue to send you the monthly progress reports
for your information.  If you have questions, please contact me
on (202)260-0198.


Attachment

-------
                                       RESOURCE MANAGEMENT COMMITTEE REPORT

                                                   JUNE 30,  1994

                                                ACTIONS IN PROGRESS
LEAD
OFFICE
ACTIONS IN PROGRESS:  OBJECTIVES
NEXT ACTION
DATE
PROJECTED' PRODUCT AND
 -   COMPLETION DATE
.;' 8ta

?>
* ! * "
•• * -. *
OIRM
13 Pilot Physical Location of
Contracting Officers and
Project Officers.
18 Certification of Agency
Project Officers
35 Use other Contract Types
36,38 Develop Policy on Indirect
Cost and Seek Amendments to
EPAAR and FAR
14 Workforce Planning (Balance
of Intramural to Extramural
Resources)
37 Develop an Integrated Contract
Management Information System
Furniture installed and move 07/15/94
to take place in mid-July
Finalize Revised Chapter 7, 07/30/94
Contracts Management Manual
Memo to OAR addressing 07/15/94
resource and timeliness issues
EPA/OAM is working with FAR
Council on continual basis to
explore alternative approaches
to amend FAR requirements for
cost principles for employee
morale costs.
NAPA is revising first draft, 07/15/94
second draft will be provided
to EPA for comments in July.
Contracts Delivery Order 08/15/94
Tracking System (CDOTS)
interface w/IFMS & EPAS
Final Analysis of Pilot
07/15/97
Issue revised Chapter 7 of
CMM 08/30/94
Institute pilot for awarding
multiple contrcts
w/identical statement of
work 07/31/94
After legislation is enacted
to impose penalties for bad
claims, FAR/EPAAR will be
amended (could be as late as
Dec. 95) .
Final NAPA Report 08/15/94
Functional prototype
completed 09/30/94

-------
LEAD -
OFFICE
ACTIONS IN PROGRESS:  OBJECTIVES
NEXT ACTION
DATE
PROJECTED PRODUCT AND
    COMPLETION DATE
t •* I ,
AO
SES
DETAILED
OHRM
40 Reconcile Personal Property
System with Integrated
Financial Management System
21 Establish Mandatory
Training for all POs,
Managers, and SESs
22 Develop Training Course
for Project Officers(POs) and
Work Assignment Mgrs(WAMs)
34 Educate Contract Personnel on
Use of Procurement Sanctions
30,31 Career Track/Grade
Structure/Awards
32 Evaluate Disciplinary System
Implementation Plan to 07/30/94
Resource Management Committee
(RHC) for approval
Complete Strategic Training 08/15/94
Plan
Establish target audiences, 11/15/94
training objectives, and
importance ranking
Incorporate module on 09/01/94
suspension and debarment into
the Lesson Plan.
Final Career Guidance Document 07/30/94
to RMC for approval
EPA Order on SES Conduct & 08/15/94
Discipline Policy awaiting
Administrator's Signature
Implement Personal Property
System 06/30/96
Issue Strategic Training
Plan 08/15/94
Issue final plan for meeting
training objectives
02/15/95
Issue revised guidance in
Contracts Management Manual
09/01/94
Issue final package for
implementation 08/30/94
Incorporate into Agency
Disciplinary System 30 days
after Order is signed.

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




           JUNE  30,  1994




         ACTIONS COMPLETED
ACTIONS COMPLETED:
ORGANIZATIONAL OBJECTIVES

1

Recommendations






1-4
7
15
16
17
33
39
Reorganized Office of Administration and
Establish Senior Resource Officials - EPA
Revised FY93 Budget Request
Resources Management
Order Signed 3/22/94




Gave Priority to Acquisition Management in FY94
Appointed SES to Lead Training Program
Use IGCEs to Analyze Contractor Costs
Policy Memorandum Dated: 03/03/93
Adherence to Prompt Pay Act
Report Issued Dated: 12/17/92

Contact: Paul Schaffer
Telephone I :
Contact: Dennis Schur,
Telephone #:

, EPA, HQ
202-260-9032
EPA, RTP
919-541-3041

-------
RESOURCE MANAGEMENT COMMITTEE REPORT
           JUNE 30, 1994
         ACTIONS COMPLETED
ACTIONS COMPLETED:
Recommendations 5
6, 12
8, 9
10
11
19, 20
23
24
25
26
27
28
29
PRODUCT
Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
Contact: Document Distribution Unit, 202-260-8573
Issued Chapter 14 to Contracts Management Manual establishing requirement for
"contracting team" concept for individual contracts from award to close out.
Dated: February 18, 1994 contact: Paul Schaffer, EPA/OAM 202-260-9032
Issued guidance for new FMFIA Process, and the Contracts Management Guiding
Principles, June 6 and June 8, 1994. Contact: Kathy Sedlak-O'Brien 202-260-9650
(FMFIA process) or Don Hambric 202-260-9404 (Guiding Principles).
Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
Management Plans for all major contracts.
Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
Acquisition Plans defining contract needs.
Dated: February 18, 1994 Contact: Fifi Good fellow, EPA/OAM 202-260-6000
Completed Training Sessions with Deputy Ethics Officials;
Ethics Orientation Courses given January, April, and July, 1993
Issued revision to Acquisition Manual to specify education requirement
for Procurement Professionals. Contact: William Sanders, 202-260-3081
Procurement Guidance Documents Indexed, Contact: Ed Murphy, EPA, CAM, 202-260-6034
Issued Independent Government Cost Estimates (IGCEs) on June 27, 1994
contact: Don Hambric 202-260-9494
Issue Monthly Contract Management Policy Bulletins, Contact: Ed Murphy, OAM
Identified Procurement Responsibilities in Job Announcements
Emphasized Contract Management in Performance Agreements
Described Acquisition Management in Positions Descriptions
Requirements Memorandum Dated: 09/30/92
OHRM Policy and Research Division Advisory 893-1008 Dated: 09/29/92
Contact: Hector E. Suarez, 202-260-3308

-------
             UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                         WASHINGTON, D.C. 20460
                                      JUL2I 1934
                                                           OFFICE OF
                                                         ADMINISTRATION
                                                         AND RESOURCES
                                                          MANAGEMENT


MEMORANDUM

SUBJECT:  Distribution  of  Resource Management Committee (formerly
          Standing Committee on Contracts Management) Material

                   (   A       ~*S2S    /
FROM:     June Mack^Y/^^vx /SCJUZ'&6*-\.s^~~~
          Resource Mansgemem: Committee Steaf f

TO:       All EPA Libraries


     I am attaching the June 30,  1994 update of the Resource
Management Committee Recommendations.  The monthly report
summarizes the current  status of actions in two categories:
Actions in Progress and Completed Actions.  During June, we
completed four recommendations.

I    Recommendation Nos 8  &  9;  On June 6, 1994, OARM announced
     the reengineered Management Integrity Program and the FY
     1994 Management Integrity Guidance.  The new integrity
     guidance states that  managers are expected to address
     program vulnerabilities while making planning, budgeting,
     and evaluation decisions.  The new process tangibly
     demonstrates the Agency's strong commitment to the National
     Performance Review.   It eliminates paper-intensive processes
     and simplifies formal reporting requirements.  This will
     reduce work-hours  devoted to administrative reporting by
     more than fifty percent.

     As a tool for SROs to use in complying with the newly
     streamlined management  integrity process, OARM issued the
     Contracts Management  Guiding Principles on June 8, 1994.
     These Principles integrate core integrity concepts into
     existing procurement  policies,  regulations and procedures.

i    Recommendation No. 23;   On June 24, 1994, OARM issued a
     revised chapter to the  Agency Acquisition Manual to upgrade
     the education requirements for Procurement Professionals.
     This is one element of  the Agency's effort to establish  a
     comprehensive training  and education program to improve
     contracts management.  We are also continuing our effort to
     implement other training recommendations.

                                                      Recycled/Recyclable
                                                      Printed with Soy/Canola Ink on paper that
                                                      contains at least 50% recycled fiber

-------
                               -2-

8    Recommendation No.  25;   On June 27,  1994,  OARM published the
     Independent Government Cost Estimates Guide.   This Guide
     will be used to assist in developing independent government
     cost estimates and determine the reasonableness of
     contractors' proposals.

     We will continue to send you the monthly progress reports
for your information.  If you have questions, please contact me
on (202)260-0198.


Attachment

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




            JUNE  30,  1994




        ACTIONS  IN PROGRESS
LEAD '
. OFFICE
ACTIONS IN PROGRESS: OBJECTIVES
NEXT ACTION DATE .
PROJECTED PRODUCT ^AND' * *
-, , , COMPLETION DATE , ,'/ '
:* '* * * % '' * " *
'. 'CAM
- ^ \

•'; :
-------
LEAD ,
OFFICE
ACTIONS IN PROGRESS:  OBJECTIVES
NEXT ACTION
                                                                      DATE
PROJECTED PRODUCT-AND
    COMPLETION. DATJB:;
"••& •
' ' . 'SES
DETAILEE
\ *
* * t *
s •> j, *
OHRM
•* v,
40 Reconcile Personal Property
System with Integrated
Financial Management System
21 Establish Mandatory
Training for all POs,
Managers, and SESs
22 Develop Training Course
for Project Of ficers(POs) and
Work Assignment Mgrs(WAMs)
34 Educate Contract Personnel on
Use of Procurement Sanctions
30,31 Career Track/Grade
Structure/ Awards
32 Evaluate Disciplinary System
Implementation Plan to 07/30/94
Resource Management Committee
(RMC) for approval
Complete Strategic Training 08/15/94
Plan
Establish target audiences, 11/15/94
training objectives, and
importance ranking
Incorporate module on 09/01/94
suspension and debarment into
the Lesson Plan.
Final Career Guidance Document 07/30/94
to RMC for approval
EPA Order on SES Conduct & 08/15/94
Discipline Policy awaiting
Administrator's Signature
Implement Personal Property
System 06/30/96
Issue Strategic Training
Plan 08/15/94
Issue final plan for meeting
training objectives
02/15/95
Issue revised guidance in
Contracts Management Manual
09/01/94
Issue final package for
implementation 08/30/94
Incorporate into Agency
Disciplinary System 30 days
after Order is signed.

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




           JUNE  30,  1994




         ACTIONS COMPLETED
[ACTIONS COMPLETED:
ORGANIZATIONAL OBJECTIVES

1

Recommendations 1-4
7
15
16
17
33
39
Reorganized Office of Administration and
Establish Senior Resource Officials - EPA
Revised FY93 Budget Request
Resources Management
Order Signed 3/22/94




Gave Priority to Acquisition Management in FY94
Appointed SES to Lead Training Program
Use IGCEs to Analyze Contractor Costs
Policy Memorandum Dated: 03/03/93
Adherence to Prompt Pay Act
Report Issued Dated: 12/17/92

Contact: Paul Schaffer
Telephone # :
Contact: Dennis Schur,
Telephone #:

, EPA, HQ
202-260-9032
EPA, RTP
919-541-3041

-------
                                   RESOURCE MANAGEMENT  COMMITTEE  REPORT


                                              JUNE 30,  1994

                                            ACTIONS COMPLETED
ACTIONS COMPLETED:   PRODUCT
Recommendations   5  Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
    	Contact;  Document Distribution Unit, 202-260-8573	
              6, 12  Issued Chapter 14 to Contracts Management Manual establishing requirement for
                     "contracting team" concept for individual contracts from award to close out.
              	Dated: February 18, 1994	Contact; Paul Schaffer, EPA/QAM 202-260-9032
              8, 9   Issued guidance for new FMFIA Process, and the Contracts Management Guiding
                     Principles, June 6 and June 8, 1994.   Contact:  Kathy Sedlak-O'Brien 202-260-9650
              	(FMFIA process) or Don Hambric 202-260-9404 (Guiding Principles).	
                10  Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
                    Management Plans for all major contracts.
                11  Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
                    Acquisition Plans defining contract needs.
                    Dated: February 18, 1994 Contact; Fifi Goodfellow, EPA/QAM  202-260-6000	
             19, 20  Completed Training Sessions with Deputy Ethics Officials;
                     Ethics Orientation Courses given January, April, and July, 1993
                 23  Issued revision to Acquisition Manual to specify education requirement
                     for Procurement Professionals.  Contact:  William Sanders, 202-260-3081
                 24  Procurement Guidance Documents Indexed, Contact:  Ed Murphy, EPA, 0AM, 202-260-6034
                 25  Issued Independent Government Cost Estimates (IGCEs) on June 27, 1994
                     contact:  Don Hambric   202-260-9494
                 26  Issue Monthly Contract Management Policy Bulletins, Contact;  Ed Murphy, 0AM	
                 27  Identified Procurement Responsibilities in Job Announcements
                 28  Emphasized Contract Management in Performance Agreements
                 29  Described Acquisition Management in Positions Descriptions
                     Requirements Memorandum Dated:  09/30/92
                     OHRM Policy and Research Division Advisory S93-1008  Dated:  09/29/92
                     Contact:  Hector E. Suarez, 202-260-3308             	

-------
              UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                         WASHINGTON. D.C. 20460
                                                             OFFICE OF
                                                           ADMINISTRATION
                                                           AND RESOURCES
                                                            MANAGEMENT
MEMORANDUM

SUBJECT:
Distribution  of Resource Management Committee  (formerly
Standing C/Jfiufi^ttee on Contracts Management) Material
FROM:      June Macke
           Resource

TO:        All EPA libraries
                     ^^ —  ^ • ^ — ^^^^~y i •— —
                     Committee  Sta
     Attached please find the May 31, 1994 update  of the Resource
Management Committee Recommendations.  The report  summarizes the
current  status of actions in three categories:  Open Actions,
Actions  in Progress, and Completed Actions.

     During May, we met an  important milestone under
Recommendation No. 30.  We  presented Contracts Management Awards
at EPA's Annual Awards Ceremony on May 11, 1994.   The awards were
presented to five individuals and to a Quality Action Team for
their  outstanding achievements.   These awards were specifically
designed to honor those employees whose extraordinary efforts
result in improved methods  to manage contracts, in significant
cost savings realized on one or more individual contracts, or in
other  significant benefits  to the Agency.

     We  will continue to send you the monthly progress reports
for your information.  If you have questions, please contact me
on  (202)  260-0198.
Attachment
                         OCT   4  1994
                      HEADQUARTERS LIBRARY
                      EMlfiMflENlAlFROlECT
                      WASHINGTON, D.C. 20460
                                                        Recycled/Recyclable
                                                        Printed with Soy/Canola Ink on paper thai
                                                        contains at least 50% recycled fiber

-------
                                       RESOURCE MANAGEMENT COMMITTEE REPORT

                                                   KAY 31, 1994

                                                ACTIONS IN PROGRESS
LEAD
OFFICE
ACflONfl IN PROGRESS*  OBJECTIVES
NEX* ACTION
DATE
PROJECTED PRODUCT AND
    COMPLETION DATE
, OAK
8,9 Strengthen FMFIA
13 Pilot Physical Location of
COs and POs
18 Certification of Agency
Project Officers
25 Independent Government Cost
Estimates (IGCEs)
35 Use other Contract Types
Issue memo with new FMFIA 06/15/94
process and Contracts
Management Guiding Principles.
Furniture installed and actual
move to take place in mid-
July. Success Measures
developed and six-month review
cycle will indicate success of
pilot. 07/15/94
Resolve one Green Broder 7/15/94
non-concur and incorporate
comments into Revised
Chapter 7.
Final Document to Printing. 06/03/94
Meet with OAR senior managers
to discuss pilot and resolve
final issues.
Issue Final Guidance
Document. 06/15/94
Final Analysis of Pilot
07/15/97
Issue revised Chapter 7 of
CMH.
08/30/94
Distribute Final IGCE "How-
to" Guide. 06/30/94
Select pilot for awarding
multiple contracts
w/ identical statement of
work. 06/30/94

-------
  LEAD
  OFFICE
 ACTIONS Xtt PROGRESS!  OBJECTIVES
           NEXT ACTION
  DATE
    PROJECTED PRODOCT AMD
        COMPLETION DATE
  OAK
36,38 Develop Policy on Indirect
      Cost and Seek Amendments to
      EPAAR and FAR
EPA/OAM is working with FAR
Council on continual basis to
explore alternative approaches
to amend FAR requirements for
cost principles for employee
morale costs.               	
          After legislation is enacted
          to impose penalties for bad
          claims, FAR/EPAAR will be
          amended (could be as late as
          Dec. 95).
          14   Workforce Planning  (Balance of
               Intramural to Extramural
               Resources)
                                     NAPA  is  revising  first draft,
                                     second draft will be  provided
                                     to  EPA for comments in July.
                                07/15/94
          Final NAPA Report. OB/15/94
 OXRM
37  Develop an Integrated Contract
    Management Information System
Contracts Delivery Order
Tracking System (CDOTS)
becomes operational.
06/30/94
Functional prototype
completed.         09/30/94
   AO
40  Reconcile Personal Property
    System with Integrated
    Financial Management System
EPA implementation Plan
completed for system being
developed by USGS.
06/30/94
Implement Personal Property
System.            09/30/95
   8ES
DETAILEE
21   Establish Mandatory
     Training for all PCs,
     Managers, and SESs
Newly formed Resource           06/13/94
Management Training  (RMT)
Committees review and discuss
strategic training plan  for
all areas of resources
management.

Complete Compendium  that lists
and describes existing          07/15/94
training courses.	
          Issue Strategic Training
          Plan.              08/15/94

-------
LEAD
OFFICE
ACTIONS IN FftOOREBS!  OBJECTIVES
ttEXT ACTIOK
DATE
                                                                                 PROJECTED PRODDCT AND
                                                                                     COMPLETION DATE
8B8
DUfAlLBB
OHRM
22 Develop Training Course
for POs and WAM
23 Upgrade EPAs Education
Requirement for Procurement
Professionals
34 Educate Contract Personnel on
Use of Procurement Sanctions
30,31 Career Track/Grade
Structure/Awards
32 Evaluate Disciplinary System
Recruit an education 06/30/94
specialist to develop and
design acquisition training
courses .
Issue Revised Guidance in 06/30/94
Acquisition Manual.
Incorporate module on 09/01/94
suspension and debarment into
the Lesson Plan.
Incorporate Agency comments
into Career Guidance Document. 06/10/94
Contract Management Awards
presented to 5 individuals and
a Quality Action Team of 13
employees at the May 11 Awards
Ceremony.
EPA Order on SES Conduct & 06/30/94
Discipline Policy being
revised to incorporate
decision of ERB.
Completion date and product
will be provided after
education specialist comes
on board.
Issue Revised Chapter in
Manual. 06/30/94
Lesson Plan completed and
available for use at
training sessions.
09/01/94
Issue Final Package for
Implementation. 06/17/94
0AM Issues Annual Call for
Contract Management Awards
each October.
Incorporate Into Agency
Disciplinary System
30-days after Order is
signed by Administrator.

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




            MAY 31, 1994




         ACTIONS COMPLETED
1 ACTIONS COMPLETED t
ORGANIZATIONAL OBJECTIVES



Recommendations 1-4
7
15
16
17
33
39
Reorganized Office of Administration and
Resources Management

Establish Senior Resource Officials - EPA Order Signed 3/22/94
Revised FY93 Budget Request
Gave Priority to Acquisition Management
Appointed SES to Lead Training Program
Use IGCEs to Analyze Contractor Costs
Policy Memorandum Dated: 03/03/93
Adherence to Prompt Pay Act
Report Issued Dated: 12/17/92

in FY94

Contact: Paul Schaffer
Telephone #:
Contact: Dennis Schur,
Telephone #:



, EPA, HQ
202-260-9032
EPA, RTP
919-541-3041

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




            MAY 31, 1994




          ACTIONS  COMPLETED
ACTIONS COMPLETED:
Recommendations 5
6, 12
10
11
19, 20
24
26
27
28
29
PRODUCT 	

Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
Contact: Document Distribution Unit, 202-260-8573
Issued Chapter 14 to Contracts Management Manual establishing requirement for
"contracting team" concept for individual contracts from award to close out.
Dated: February 18, 1994 Contact: Paul Schaffer, EPA/OAM 202-260-9032
Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
Management Plans for all major contracts.
Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
Acquisition Plans defining contract needs.
Dated: February 18, 1994 Contact: Fifi Goodfellow. EPA/OAM 202-260-6000
Completed Training Sessions with Deputy Ethics Officials;
Ethics Orientation Courses given January, April, and July, 1993

Procurement Guidance Documents Indexed, Contact: Ed Murphy, EPA, 0AM, 202-260-6034
Issue Monthly Contract Management Policy Bulletins, Contact: Ed Murphy, OAM
Identified Procurement Responsibilities in Job Announcements
Emphasized Contract Management in Performance Agreements
Described Acquisition Management in Positions Descriptions
Requirements Memorandum Dated: 09/30/92
OHRM Policy and Research Division Advisory #93-1008 Dated: 09/29/92
Contact: Hector E. Suarez, 202-260-3308


-------
              UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                         WASHINGTON, D.C. 20460
                           JUN  14 BM
                                                            OFFICE OF
                                                          ADMINISTRATION
                                                          AND RESOURCES
                                                           MANAGEMENT


MEMORANDUM

SUBJECT:  Distribution of Resource Management  Committee (formerly
          Standing CjeJfn5Ti,ttee on Contracts Management)  Material

FROM:     June Macke
          Resource

TO:       All EPA libraries


     Attached please find the May 31, 1994 update of the Resource
Management Committee Recommendations.  The report summarizes the
current status of actions in three categories:   Open Actions,
Actions in Progress,  and Completed Actions.

     During May,  we met an important milestone under
Recommendation No. 30.  We presented Contracts Management Awards
at EPA's Annual Awards Ceremony on May 11, 1994.   The awards were
presented to five individuals and to a Quality Action Team for
their outstanding achievements.  These awards  were specifically
designed to honor those employees whose extraordinary efforts
result in improved methods to manage contracts,  in significant
cost savings realized on one or more individual contracts, or in
other significant benefits to the Agency.

     We will continue to send you the monthly  progress reports
for your information.  If you have questions,  please contact me
on (202) 260-0198.


Attachment
                                                       Recycled/Recyclable
                                                       Printed with Soy/Canola Ink on paper that
                                                       contains at least 50% recycled fiber

-------
                                       RESOURCE MANAGEMENT COMMITTEE REPORT

                                                   MAY 31, 1994

                                                ACTIONS  IN PROGRESS
LEAD
          ACTIONS IN PROGRESS:  OBJECTIVES
NEXT ACTION
DATE
PROJECTED PRODUCT AND
    COMPLETION DATE
OAK
8,9 Strengthen FMFIA
13 Pilot Physical Location of
COs and POs
18 Certification of Agency
Project Officers
25 Independent Government Cost
Estimates (IGCEs)
35 Use other Contract Types
Issue memo with new FMFIA 06/15/94
process and Contracts
Management Guiding Principles.
Furniture installed and actual
move to take place in mid-
July. Success Measures
developed and six-month review
cycle will indicate success of
pilot. 07/15/94
Resolve one Green Broder 7/15/94
non-concur and incorporate
comments into Revised
Chapter 7.
Final Document to Printing. 06/03/94
Meet with OAR senior managers
to discuss pilot and resolve
final issues.
Issue Final Guidance
Document. 06/15/94
Final Analysis of Pilot
07/15/97
Issue revised Chapter 7 of
CMM.
08/30/94
Distribute Final IGCE "How-
to" Guide. 06/30/94
Select pilot for awarding
multiple contracts
w/identical statement of
work. 06/30/94

-------
LEAD
OFFICE
ACTJOKfi tit PROGREBB: OBJBCflVEfi
NEXT ACTION DATE
PROJECTED PRODUCT AND
COMPLETION DATE
  0AM
36,38 Develop Policy on Indirect
      Cost and Seek Amendments to
      EPAAR and FAR
EPA/OAM is working with FAR
Council on continual basis to
explore alternative approaches
to amend FAR requirements for
cost principles for employee
morale costs.
          After legislation is enacted
          to impose penalties for bad
          claims,  FAR/EPAAR will be
          amended (could be as late as
          Dec.  95).
           14   Workforce  Planning  (Balance of
               Intramural to  Extramural
               Resources1
                                     NAPA is revising first draft,
                                     second draft will be provided
                                     to EPA for comments in July.
                                07/15/94
          Final NAPA Report. 08/15/94
 OIRM
37  Develop an Integrated Contract
    Management Information System
Contracts Delivery Order
Tracking System  (CDOTS)
becomes operational.
06/30/94
Functional prototype
completed.         09/30/94
           40  Reconcile Personal Property
               System with Integrated
               Financial Management system
                                     EPA Implementation Plan
                                     completed for system being
                                     developed by USGS.
                                06/30/94
          Implement Personal Property
          System.            09/30/95
   BBS
DETAILS*!
21   Establish Mandatory
     Training for all POs,
     Managers, and SESs
Newly formed Resource           06/13/94
Management Training  (RMT)
Committees review and discuss
strategic training plan  for
all areas of resources
management.

Complete Compendium  that lists
and describes  existing          07/15/94
training courses.	
          Issue Strategic Training
          Plan.              08/15/94

-------
  LEAD
  OFFICE
 ACTIONS IN PROGRESS:  OBJECTIVES
           NEXT ACTION
  DAT8
    PROJECTED PRODUCT AMD
        COMPLETION DATE
  BBS
DBTAILBB
22   Develop Training Course
     for POs and WAH
Recruit an education
specialist to develop and
design acquisition training
06/30/94
                                                courses.
Completion date and product
will be provided after
education specialist comes
on board.
           23   Upgrade EPAs Education
                Requirement for Procurement
                Professionals
                                     Issue  Revised  Guidance  in
                                     Acquisition Manual.
                                06/30/94
          Issue Revised Chapter in
          Manual.            06/30/94
           34   Educate Contract Personnel on
                Use of Procurement Sanctions
                                     Incorporate module on
                                     suspension and debarment into
                                     the  Lesson Plan.
                                09/01/94
          Lesson Plan completed and
          available for use at
          training sessions.
          	09/01/94
  OHRM
30,31 Career Track/Grade
      Structure/Awards
Incorporate Agency comments
into Career Guidance Document.

Contract Management Awards
presented to 5 individuals and
a Quality Action Team of 13
employees at the May 11 Awards
Ceremony.	
                                                                                06/10/94
          Issue Final Package for
          Implementation.    06/17/94

          0AM Issues Annual Call for
          Contract Management Awards
          each October.
           32   Evaluate Disciplinary System
                                     EPA  Order on  SES Conduct  &
                                     Discipline Policy being
                                     revised  to incorporate
                                     decision of ERB.
                                06/30/94
          Incorporate Into Agency
          Disciplinary System
          30-days after Order is
          signed by Administrator.

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




            MAY 31, 1994



         ACTIONS  COMPLETED
1 ACTIONS COMPLETED!
ORGANIZATIONAL OBJECTIVES

«

Recommendations 1-4
7
15
16
17
33
39
Reorganized Office of Administration and
Resources Management

Establish Senior Resource Officials - EPA Order Signed 3/22/94
Revised FY93 Budget Request
Gave Priority to Acquisition Management
Appointed SES to Lead Training Program
Use IGCEs to Analyze Contractor Costs
Policy Memorandum Dated: 03/03/93
Adherence to Prompt Pay Act
Report issued Dated: 12/17/92

in FY94

Contact: Paul Schaffer
Telephone #:
Contact: Dennis Schur,
Telephone #:



, EPA, HQ
202-260-9032
EPA, RTF
919-541-3041

-------
                                   RESOURCE MANAGEMENT COMMITTEE REPORT

                                               MAY 31, 1994

                                            ACTIONS COMPLETED   	
ACTIONS COMPLETED:    PRODUCT
Recommendations    5   Cookbook entitled "How to Get Contracts Awarded at EPA"  distributed 12/30/93
	Contact:   Document Distribution Unit,  202-260-8573
               6,  12   Issued Chapter 14  to Contracts Management Manual  establishing requirement for
                      "contracting team" concept for individual contracts from award to close out.
              	Dated; February 18,  1994      Contact;  Paul Schaffer,  EPA/QAM 202-260-9032
                  10   Issued revision to Chapter 1 to Contracts Management Manual  requiring Contract
                      Management Plans for all major contracts.
                  11   Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
                      Acquisition Plans defining contract needs.
                      Dated; February 18,  1994     Contact;  Fifi Goodfellow,  EPA/QAM  202-260-6000
              19,  20  Completed Training Sessions with Deputy Ethics Officials;
             	Ethics Orientation Courses given January,  April,  and July,  1993
                  24   Procurement Guidance Documents Indexed,  Contact:   Ed Murphy,  EPA,  0AM,  202-260-6034
                  26   Issue Monthly Contract Management Policy Bulletins,  Contact;   Ed Murphy,  0AM	
                  27  Identified Procurement Responsibilities in Job Announcements
                  28  Emphasized Contract Management in Performance Agreements
                  29  Described Acquisition Management in Positions Descriptions
                      Requirements Memorandum Dated:  09/30/92
                      OHRM Policy and Research Division Advisory #93-1008  Dated:   09/29/92
                      Contact;   Hector E. Suarez,  202-260-3308

-------
              UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                         WASHINGTON. D.C. 20460
                                                            OFFICE OF
                                                          ADMINISTRATION
                                                          AND RESOURCES
                                                           MANAGEMENT
MEMORANDUM

SUBJECT


FROM:


TO:
Distribution of  Resource Management Committee (formerly
Standing Cefmnt^ttee on Contracts Management)  Material

June Macke
Resource M
All EPA
    gement

ibraries
Committee
     Attached please find the May 31, 1994  update of the Resource
Management Committee Recommendations.  The  report summarizes the
current status  of  actions in three categories:   Open Actions,
Actions in Progress,  and Completed Actions.

     During May, we met an important milestone  under
Recommendation  No.  30.   We presented Contracts  Management Awards
at EPA's Annual Awards  Ceremony on May 11,  1994.   The awards were
presented to five  individuals and to a Quality  Action Team for
their outstanding  achievements.  These awards were specifically
designed to honor  those employees whose extraordinary efforts
result in improved methods to manage contracts,  in significant
cost savings realized on one or more individual contracts, or in
other significant  benefits to the Agency.

     We will continue to send you the monthly progress reports
for your information.  If you have questions, please contact me
on (202) 260-0198.
Attachment
                                                       Recycled/Recyclable
                                                       Printed with Soy/Canola Ink on paper that
                                                       contains at least 50% recycled fiber

-------
                          STATUS REPORT
    STANDING COMMITTEE ON CONTRACTS MANAGEMENT RECOMMENDATIONS


     This Status Report provides an update of progress made on
the forty recommendations in EPA's June 1992 report Contracts
Management at EPA:  Managing Our Mission;  Recommendations of the
Standing Committee on Contracts Management.

     The actions described in this Report address improvements in
EPA's contract management.   Because EPA uses contracts for a wide
range of goods and services, accountable contracts management is
essential to the overall sound management of the Agency.

     By June 1993, the scope of the Standing Committee on
Contracts Management was expanded to include assistance and
relevant aspects of financial management, as well as acquisition.
The Committee was renamed the Resource Management Committee.
The Status Report is organized into two sections by the current
status of the actions:

     o     Actions in Progress:  The approach to these actions
           has been approved and implementation plans are
           underway.

           This chart is organized by lead office.  The chart
           lists the objective, the current status and projected
           product completion date.

     o     Completed Actions:  Actions completed with a contact
           point, if appropriate, for the final product.

     Copies of the June 1992 report and this Monthly Status
Reports are available in EPA libraries.  For further information
on the Resource Management Committee, please contact the
Committee staff at  (202) 260-4600.

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




            MAY 31, 1994




        ACTIONS  IN PROGRESS
LEAD
OFFICE
ACTIONS IN PROGRESS; OBJECTIVES
NEXT ACTION DATE
PROJECTED PRODUCT AND
COMPLETION DATE
OAK
8,9 Strengthen FMFIA
13 Pilot Physical Location of
COs and POs
18 Certification of Agency
Project Officers
25 Independent Government Cost
Estimates (IGCEs)
35 Use other Contract Types
Issue memo with new FMFIA 06/15/94
process and Contracts
Management Guiding Principles.
Furniture installed and actual
move to take place in mid-
July. Success Measures
developed and six-month review
cycle will indicate success of
pilot. 07/15/94
Resolve one Green Broder 7/15/94
non-concur and incorporate
comments into Revised
Chapter 7.
Final Document to Printing. 06/03/94
Meet with OAR senior managers
to discuss pilot and resolve
final issues.
Issue Final Guidance
Document. 06/15/94
Final Analysis of Pilot
07/15/97
Issue revised Chapter 7 of
CMM.
08/30/94
Distribute Final IGCE "How-
to" Guide. 06/30/94
Select pilot for awarding
multiple contracts
w/identical statement of
work. 06/30/94

-------
  LEAD
  OFFICE
 ACTIONS IN PROGRESS:  OBJECTIVES
           NEXT ACTION
  DATE
    PROJECTED PRODDCT AND
        COMPLETION DATE

                     	a
  0AM
36,38 Develop  Policy on  Indirect
      Cost and Seek Amendments  to
      EPAAR and  FAR
EPA/OAM is working with FAR
Council on continual basis to
explore alternative approaches
to amend FAR requirements for
cost principles for employee
morale costs.          	
          After legislation is enacted
          to impose penalties for bad
          claims, FAR/EPAAR will be
          amended (could be as late as
          Dec. 95).
   OC
14   Workforce Planning (Balance of
     Intramural to Extramural
	Resources)	
NAPA is revising first draft,
second draft will be provided
to EPA for comments in July.
07/15/94
Final NAPA Report. 08/15/94
 OIRM
 37  Develop an  Integrated  Contract
    Management  information System
Contracts Delivery Order
Tracking System (CDOTS)
becomes operational.	
06/30/94
Functional prototype
completed.         09/30/94
           40  Reconcile Personal Property
               System with Integrated
               Financial Management System
                                     EPA Implementation Plan
                                     completed for system being
                                     developed by USGS.
                                06/30/94
          Implement Personal Property
          System.            09/30/95
   BBS
DETAILEE
 21   Establish  Mandatory
     Training for  all  POs,
     Managers,  and SESs
Newly formed Resource           06/13/94
Management Training (RMT)
Committees review and discuss
strategic training plan for
all areas of resources
management.

Complete Compendium that lists
and describes existing          07/15/94
training courses.	
          Issue Strategic Training
          Plan.              08/15/94

-------
  LEAD
  OFFICE
 ACTIONS IN PROGRESS:  OBJECTIVES
           NEXT ACTION
  DATE
    PROJECTED PRODUCT AND
        COMPLETION DATE
  SES
DETAILEE
22   Develop Training Course
     for POs and WAN
Recruit an education
specialist to develop and
design acquisition training
courses.
06/30/94
Completion date and product
will be provided after
education specialist comes
on board.
           23   Upgrade EPAs Education
                Requirement for Procurement
                Professionals
                                     Issue  Revised Guidance  in
                                     Acquisition Manual.
                                06/30/94
          Issue Revised Chapter in
          Manual.            06/30/94
           34   Educate Contract Personnel on
                Use of Procurement Sanctions
                                    Incorporate module on
                                    suspension and debarment into
                                    the Lesson Plan.
                                09/01/94
          Lesson Plan completed and
          available for use at
          training sessions.
          	09/01/94
  OHRM
30,31 Career Track/Grade
      Structure/Awards
Incorporate Agency comments
into Career Guidance Document.

Contract Management Awards
presented to 5 individuals and
a Quality Action Team of 13
employees at the May 11 Awards
Ceremony.	
                                                                               06/10/94
          Issue Final Package for
          Implementation.    06/17/94

          OAM Issues Annual Call for
          Contract Management Awards
          each October.
           32   Evaluate Disciplinary System
                                    EPA Order on SES Conduct &
                                    Discipline Policy being
                                    revised to incorporate
                                    decision of ERB.
                                06/30/94
          Incorporate Into Agency
          Disciplinary System
          30-days after Order is
          signed by Administrator.

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




            MAY 31, 1994




         ACTIONS COMPLETED
1 ACTIONS COMPLETED}
ORGANIZATIONAL OBJECTIVES

I

Recommendations 1-4
7
15
16
17
33
39
Reorganized Office of Administration and
Resources Management

Establish Senior Resource Officials - EPA Order Signed 3/22/94
Revised FY93 Budget Request
Gave Priority to Acquisition Management
Appointed SES to Lead Training Program
Use IGCEs to Analyze Contractor Costs
Policy Memorandum Dated: 03/03/93
Adherence to Prompt Pay Act
Report Issued Dated: 12/17/92

in FY94

Contact: Paul Schaffer
Telephone fl :
Contact: Dennis Schur,
Telephone # :



, EPA, HQ
202-260-9032
EPA, RTP
919-541-3041

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




            MAY 31, 1994




         ACTIONS  COMPLETED
ACTIONS COMPLETED:
Recommendations 5
6, 12
10
11
19, 20
24
26
27
28
29
PRODUCT

Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
Contact: Document Distribution Unit, 202-260-8573
Issued Chapter 14 to Contracts Management Manual establishing requirement for
"contracting team" concept for individual contracts from award to close out.
Dated: February 18, 1994 Contact: Paul Schaffer, EPA/OAM 202-260-9032
Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
Management Plans for all major contracts.
Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
Acquisition Plans defining contract needs.
Dated: February 18, 1994 Contact: Fifi Goodfellow, EPA/OAM 202-260-6000
Completed Training Sessions with Deputy Ethics Officials;
Ethics Orientation Courses given January, April, and July, 1993

Procurement Guidance Documents Indexed, Contact: Ed Murphy, EPA, OAM, 202-260-6034
Issue Monthly Contract Management Policy Bulletins, Contact: Ed Murphy, OAM
Identified Procurement Responsibilities in Job Announcements
Emphasized Contract Management in Performance Agreements
Described Acquisition Management in Positions Descriptions
Requirements Memorandum Dated: 09/30/92
OHRM Policy and Research Division Advisory #93-1008 Dated: 09/29/92
Contact: Hector E. Suarez, 202-260-3308


-------
               UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                          WASHINGTON, D.C. 20460
                             MAY I 0  1994
                                                              OFFICE OF
                                                            ADMINISTRATION
                                                            AND RESOURCES
                                                             MANAGEMENT
MEMORANDUM
SUBJECT:   Distribution  of Resource Management Committee (formerly
           Standing CdmmT^tee on Contracts  Management)  Material
FROM:      June                      .
           Resource ManiqjementcTommittee  Staff

TO:        All EPA Liwfaries        (    5      £/


     Attached please  find the April  30,  1994 update  of the
Resource Management Committee Recommendations.  The  monthly
report  summarizes the current status of  actions in three
categories:   Open Actions,  Actions in Progress, and  Completed
Actions.

     We will continue to send you the monthly progress reports
for  your information.   If you have questions, please contact me
on  (202) 260-0198.


Attachment
                                                         Recycled/Recyclable
                                                         Printed with Soy/Canola Ink on paper that
                                                         contains at least 50% recycled fiber

-------
                                       RESOURCE MANAGEMENT COMMITTEE REPORT

                                                  APRIL 30, 1994

                                                   OPEN ACTIONS
LEAD
OFFICE
OPEN ACTIONS:  OBJECTIVES
NEXT ACTION
DATE
PROJECTED PRODUCT ANP
    COMPLETION
  0AM    13   Pilot Physical
              Location of COs and
              POs
                            3-year pilot with OSWER will
                            begin June 1, 1994.   Success
                            Measures developed and six-month
                            review cycle will indicate
                            success of pilot.
                         06/01/94
        Final Analysis of Pilot
                           06/01/97
         35   Use Other Contract
              Types
                            Meet with OAR staff to discuss     05/19/94
                            pilot and resolve final issues.
                                   Select pilot for awarding
                                   multiple contracts w/identical
                                   statement of work.  05/30/94

-------
                                       RESOURCE MANAGEMENT COMMITTEE REPORT

                                                  APRIL 30, 1994

                                                ACTIONS  IN PROGRESS
LEAD
OFFICE
ACTIONS IN PROGRESS:  OBJECTIVES
NEXT ACTION
DATE
                                                                                  PROJECTED PRODUCT AND
                                                                                  -   COMPLETION DATS
0AM

1 OC
8,9 Strengthen FMFIA
18 Certification of Agency
Project Officers
25 Independent Government Cost
Estimates (IGCEs)
36,38 Develop Policy on Indirect
Cost and Seek Amendments to
EPAAR and FAR
14 Workforce Planning (Balance
of Intramural to Extramural
Resources)
Issue Contracts Management 05/31/94
Guiding Principles in keeping '
with reengineering of Agency's
FMFIA program.
Green Border Review in 5/30/94
progress for Revised Chapter 7
Comments due 5/30.
Green Border Review completed.
Comments incorporated and
final document awaiting
approval of OAM Director. 05/30/94
EPA/OAM is working with FAR
Council on continual basis to
explore alternative approaches
to amend FAR requirements for
cost principles for employee
morale costs.
Initial findings of NAPA Study 05/30/94
Issue Final Guidance
Document 05/31/94
Issue revised Chapter 7 of
CMM OB/ 3 0/94
Distribute Final IGCE "How-
to" Guide 06/30/94
After legislation is enacted
to impose penalties for bad
claims, FAR/EPAAR will be
amended (could be as late as
Dec. 95) .
Final NAPA Report 07/30/94

-------
  LEAD
  OFFICE
 ACTIONS IN PROGRESS:  OBJECTIVES
           NEXT ACTION
  DATE
    PROJECTED PRODUCT AND
        COMPLETION DATE
 OIRM
37  Develop an Integrated Contract
    Management Information System
Contracts Delivery Order
Tracking System (CDOTS)
becomes operational
06/30/94
Functional prototype
completed  09/30/94
   AO
40  Reconcile Personal Property
    System with Integrated
    Financial Management System
EPA Implementation Plan
completed for systen being
developed by USGS
06/30/94
Implement Personal Property
System   09/30/95
   SE8
DETAILEE
21   Establish Mandatory
     Training for all POs,
     Managers, and SESs
Complete analysis of feedback
from Pilot Sessions of CBT
Version of New Employees
Orientation and Contracts
Overview.
05/30/94
Products and Completion
Dates will be provided upon
completion of action plan
from new training
coordinator (due June 30,
1994) for Recommendations
121, «22, and 134.
           22   Develop Training Course
                for POs and WAM
                                     A training  needs analysis
                                     being  done  by new training
                                     coordinator.   Request  made  to
                                     recruit  an  education
                                     specialist  to develop  and
                                     design training  courses.
                                06/15/94
           23   Upgrade EPAs Education
                Requirement for Procurement
                Professionals
                                     Issue  Revised  Guidance  in       06/30/94
                                     Contracts  Management  Manual
                                          Issue Revised Chapter in CMM
                                          06/30/94
           34   Educate Contract Personnel on
                Use of Procurement Sanctions
                                    New Training Coordinator  is
                                    reviewing status and will
                                    update  the workplan for this
                                    recommendat ion.
                                06/15/94
          See above note.

-------
LEAD
OFFICE
ACTIONS IN PROGRESS;  OBJECTIVES
NEXT ACTION
DATE
PROJECTED PRODUCT AND
    COMPLETION DATE
OHRR

30,31 Career Track/Grade
Structure/ Awards
32 Evaluate Disciplinary System
Comments due on Draft Career 05/06/94
Guidance Document.
Contract Management Award 05/11/94
Winners Recognized at EPA
Awards Ceremony
EPA Order on SES Conduct & 05/15/94
Discipline Policy awaiting
Administrator's Signature
Issue Final Package for
Implementation 05/30/94
0AM Issues Annual Call for
Contract Management Awards
10/01/94
Incorporate Into Agency
bisciplinary System
05/30/94

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




           APRIL 30, 1994




         ACTIONS COMPLETED
ACTIONS COMPLETED:
Recommendations 5
6, 12
10
11
19, 20
24
26
27
28
29
PRODUCT

Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
Contact: Document Distribution Unit, 202-260-8573
Issued Chapter 14 to Contracts Management Manual establishing requirement for
"contracting team" concept for individual contracts from award to close out.
Dated: February 18, 1994 Contact: Paul Schaffer, EPA/OAM 202-260-9032
Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
Management Plans for all major contracts.
Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
Acquisition Plans defining contract needs.
Dated: February 18, 1994 Contact: Fifi Goodfellow, EPA/OAM 202-260-6000
Completed Training Sessions with Deputy Ethics Officials;
Ethics Orientation Courses given January, April, and July, 1993

Procurement Guidance Documents Indexed, Contact: Ed Murphy, EPA, OAM, 202-260-6034
Issue Monthly Contract Management Policy Bulletins, Contact: Ed Murphy, OAM
Identified Procurement Responsibilities in Job Announcements
Emphasized Contract Management in Performance Agreements
Described Acquisition Management in Positions Descriptions
Requirements Memorandum Dated: 09/30/92
OHRM Policy and Research Division Advisory #93-1008 Dated: 09/29/92
Contact: Hector E. Suarez, 202-260-3308


-------
RESOURCE MANAGEMENT COMMITTEE REPORT




           APRIL 30, 1994




         ACTIONS COMPLETED
I ACTIONS COMPLETED:
ORGANIZATIONAL OBJECTIVES

1

Recommendations 1-4
7
15
16
17
33
39
Reorganized Office of Administration and
Establish Senior Resource Officials - EPA
Revised FY93 Budget Request
Resources Management
Order Signed 3/22/94




Gave Priority to Acquisition Management in FY94
Appointed SES to Lead Training Program
Use IGCEs to Analyze Contractor Costs
Policy Memorandum Dated: 03/03/93
Adherence to Prompt Pay Act
Report Issued Dated: 12/17/92

Contact: Paul Schaffer
Telephone #:
Contact: Dennis Schur,
Telephone #:

, EPA, HQ
202-260-9032
EPA, RTP
919-541-3041

-------
              UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                         WASHINGTON, D.C. 20460
                             APR 1 2
                                                             OFFICE OF
                                                            AD MINISTRATION
                                                            AND RE SOURCES
                                                            MANAGEMENT
MEMORANDUM

SUBJECT


FROM:


TO:
           Distribution of  Resource Management Committee (formerly
           Standing CoBttnittee on Contracts  Management) Material
June
Resource

All EPA
                      raries  FE6  (
                                 -*n/}           ^
                                 //itte^^'y'
                                Committee  Sta«

                                 Q   / IQQt;   (-s
     Attached please find the March 31,  1994 update of the
Resource  Management Committee Recommendations.  The monthly
report  summarizes the current status of  actions in three
categories:   Open Actions,  Actions in  Progress, and Completed
Actions.

     We will continue to  send you the  monthly progress reports
for your  information.   If you have questions, please  contact me
on  (202)  260-0198.
Attachment
                                                        Recycled/Recyclable
                                                        Printed with Soy/Canola Ink on paper that
                                                        contilni al least 5W4 recycled fiber

-------
                    Monthly Status Report on

    Standing Committee on Contracts Management Recommendations

           from the Resource Management Committee Staff


     This Monthly Status Report provides an update of progress
made on the forty recommendations in EPA's June 1992 report
Contracts Management at EPA;   Managing Our Mission?
Recommendations of the Standing Committee on Contracts
Management.

     The actions described in this Report address improvements in
EPA's contract management.   Because EPA uses contracts for a wide
range of goods and services,  accountable contracts management is
essential to the overall sound management of the Agency.

     By June 1993, the scope of the Standing Committee on
Contracts Management was expanded to include assistance and
relevant aspects of financial management, as well as acquisition.
The Committee was renamed the Resource Management Committee.
The Monthly Status Report is organized into 3 sections by the
current status of the actions:

     o  2 Charts for work in progress:

           Open Actions:  Key decisions still need to be made by
           the Committee.

           Actions in Progress:  The approach to these actions
           has been approved and implementation plans are
           underway.

        -  Both of these charts are organized by lead office.
           The charts list the objective, the current status and
           projected product completion date.

     o  1 Chart for completed work:

           Completed Actions:   Actions completed with a contact
           point, if appropriate, for the final product.

     Copies of the June 1992 report and this Monthly Status
Report are available in EPA libraries.  For further information
on the Resource Management Committee, please contact the
Committee staff at (202) 260-0198.

-------
                                       RESOURCE MANAGEMENT COMMITTEE REPORT

                                                  MARCH 31, 1994

                                                   OPEN ACTIONS
LEAD
OFFICE
OPEN ACTIONS:  OBJECTIVES
                                      NEXT ACTION
                                                                 DATE
                                                                             PROJECTED PRODUCT AND
                                                                                 COMPLETION  DATE
  OAM    13   Pilot Physical
              Location of COs and
              POs
                            Awaiting furniture delivery and    06/01/94
                            installation
          Analysis of Pilot  06/01/97
         35   Use Other Contract
              Types
                            Select Candidate to Pilot
                            Multiple Awards
04/30/94
Draft Solicitation Provisions
and Contract Clauses on Use of
Hybrid Contracts Will be Part
of Solicitation Selected for
the Pilot          05/30/94

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




           MARCH 31, 1994




        ACTIONS  IN  PROGRESS
LEAD
OFFICE
ACTIONS IN PROGRESS: OBJECTIVES
NEXT ACTION DATE
PROJECTED PRODUCT AND
COMPLETION DATE
OAM

OC
OIRM
AO
8,9 Strengthen FMFIA
18 Certification of Agency
Project Officers
25 Independent Government Cost
Estimates (IGCEs)
36,38 Develop Policy on Indirect
Cost and Seek Amendments to
EPAAR and FAR
14 Workforce Planning (Balance
of Intramural to Extramural
Resources)
37 Develop an Integrated Contract
Management Information System
40 Reconcile Personal Property
System with Integrated
Financial Management System
Continue to resolve Green 04/15/94
Border Comments
Re-issue Green Border 04/08/94
Complete Green Border Review 04/30/94
Enactment of Cabinet Level
Bill which includes
recommendations made by the
SCCM/RMC for Items 36 and 38
Complete Interviews with 04/25/94
Congressional Staff
Hold second Advisory Panel 04/12/94
Meeting
Contracts Delivery Order 06/30/94
Tracking System (CDOTS)
Becomes Operational
Present Cost-Benefit Analysis 04/15/94
to Senior Management
Complete Implementation Plan 05/31/94
Issue Final Guidance
Document 05/30/94
Guidance in Chapter 7 of CMM
05/30/94
Final IGCE "How-to" Guide
06/30/94
FAR Revisions - Nine Months
After Congressional Action
EPAAR Revisions - One Year
After Congressional Action
Draft Report 05/15/94 -
Final Report 06/30/94
Functional prototype
completed 09/30/94
Implement Personal Property
System 09/30/95

-------
LEAD
OFFICE
ACTIONS IN PROGRESS:  OBJECTIVES
NEXT ACTION
                                                                     DATE
                                   PROJECTED PRODUCT AND
                                       COMPLETION DATE
SES
DETAILEE

OHRM

21 Establish Mandatory
Training for all POs,
Managers, and SESs
22 Develop Training Course
for POs and WANs
23 Upgrade EPAs Education
Requirement for Procurement
Profess ionals
34 Educate Contract Personnel on
Use of Procurement Sanctions
30,31 Career Track/Grade
Structure/Awards
32 Evaluate Disciplinary System
Pilot Session of CBT Version 04/11/94
of New Employees Orientation
Pilot Session of CBT Version 04/25/94
of Contracts Overview
Course Development and Design 05/30/94
Issue Revised Guidance in 06/30/94
Contracts Management Manual
Circulate Proposed Guidance 04/30/94
within OAM for Comments
Comments due on Draft Career 05/06/94
Guidance Document.
Contract Management Award 05/17/94
Winners Recognized at EPA (tent.)
Awards Ceremony
EPA Order on SES Conduct & 05/15/94
Discipline Policy awaiting
Administrator's Signature
Strategy, Framework, and
Transition Plan 04/94
Course Development and
Design 05/30/94
Issue Revised Chapter in CMM
06/30/94
Issue Revised Guidance in
CMM 06/30/94
Issue Final Package for
Implementation 05/30/94
OAM Issues Annual Call for
Contract Management Awards
10/01/94
Incorporate Into Agency
Disciplinary System
05/30/94

-------
                                   RESOURCE MANAGEMENT COMMITTEE REPORT

                                              MARCH 31, 1994

                                             ACTIONS COMPLETED
 ACTIONS COMPLETED:   PRODUCT
 Recommendations   5  Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
	Contact:  Document Distribution Unit, 202-260-8573

               6, 12  Issued Chapter 14 to Contracts Management Manual establishing requirement for
                      "contracting team" concept for individual contracts from award to close out.
	Dated; February 18, 1994     Contact; Paul Schaffer, EPA/QAM 202-260-9032	

                  10  Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
                      Management Plans for all major contracts.
                  11  Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
                      Acquisition Plans defining contract needs.
	Dated; February 18, 1994	Contact: Fifi Goodfellow, EPA/QAM  202-260-6000	

              19, 20  Completed Training Sessions with Deputy Ethics Officials;
	Ethics Orientation Courses given January, April, and July, 1993	

                  24  Procurement Guidance Documents Indexed, Contact:  Ed Murphy, EPA, 0AM, 202-260-6034
	26  Issue Monthly Contract Management Policy Bulletins, Contact;  Ed Murphy, 0AM	

                  27  Identified Procurement Responsibilities in Job Announcements
                  28  Emphasized Contract Management in Performance Agreements
                  29  Described Acquisition Management in Positions Descriptions
                      Requirements Memorandum Dated:  09/30/92
                      OHRM Policy and Research Division Advisory #93-1008  Dated:  09/29/92
                      Contact:  Hector E. Suarez, 202-260-3308             	

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




           MARCH 31, 1994




         ACTIONS COMPLETED
(ACTIONS COMPLETED:

Recommendations 1-4
7
15
16
17
33
39
ORGANIZATIONAL OBJECTIVES

Reorganized Office of Administration and
Establish Senior Resource Officials - EPA
Revised FY93 Budget Request


Resources Management
Order Signed 3/22/94

1




Gave Priority to Acquisition Management in FY94
Appointed SES to Lead Training Program
Use IGCEs to Analyze Contractor Costs
Policy Memorandum Dated: 03/03/93
Adherence to Prompt Pay Act
Report issued Dated: 12/17/92

Contact: Paul Schaffer
Telephone # :
Contact: Dennis Schur,
Telephone #:

, EPA, HQ
202-260-9032
EPA, RTP
919-541-3041

-------
             UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                         WASHINGTON. D.C. 20460
                                    MAR 07 1994
                                                            OFFICE OF
                                                           ADMINISTRATION
                                                           AND RE SOURCES
                                                           MANAGEMENT
MEMORANDUM

SUBJECT:
           Distribution of Resource Management Committee  (formerly
           Standing CoirfmT^tee  on Contracts Management) Material
FROM:     June Mackey
          Resource Ma
TO:        All EPA Libraries
                                „
                                Committee
     Attached please find  the February 28,  1994 update of  the
Resource  Management Committee Recommendations.   The monthly
report summarizes the current status of actions in three
categories:   Open Actions,  Actions in Progress, and Completed
Actions.

     We will continue to send you the monthly progress reports
for your  information.  If  you have questions,  please contact me
on (202)  260-0198.
Attachment
                                                       Recycled/Recyclable
                                                       Printed with Soy/Canola Ink on paper that
                                                       contains at least 50% recycled fiber

-------
                    Monthly Status Report on

    Standing Committee on Contracts Management Recommendations

           from the Resource Management Committee Staff


     This Monthly Status Report provides an update of progress
made on the forty recommendations in EPA's June 1992 report
Contracts Management at EPA;   Managing Our Mission;
Recommendations of the Standing Committee on Contracts
Management.

     The actions described in this Report address improvements in
EPA's contract management.   Because EPA uses contracts for a wide
range of goods and services,  accountable contracts management is
essential to the overall sound management of the Agency.

     By June 1993, the scope of the Standing Committee on
Contracts Management was expanded to include assistance and
relevant aspects of financial management, as well as acquisition.
The Committee was renamed the Resource Management Committee.
The Monthly Status Report is organized into 3 sections by the
current status of the actions:

     o  2 Charts for work in progress:

        -  Open Actions:  Key decisions still need to be made by
           the Committee.

        -  Actions in Progress:  The approach to these actions
           has been approved and implementation plans are
           underway.

           Both of these charts are organized by lead office.
           The charts list the objective, the current status and
           projected product completion date.

     o  1 Chart for completed work:

        -  Completed Actions:  Actions completed with a contact
           point, if appropriate, for the final product.

     Copies of the June 1992 report and this Monthly Status
Report are available in EPA libraries.  For further information
on the Resource Management Committee, please contact the
Committee staff at (202) 260-0198.

-------
                                       RESOURCE MANAGEMENT COMMITTEE REPORT

                                                 FEBRUARY 28, 1994

                                                   OPEN ACTIONS
LEAD
OFFICE
 OPEN ACTIONS:  OBJECTIVES
          NEXT ACTION
  DATE
PROJECTED PRODUCT AND
    COMPLETION DATE
  0AM
13   Pilot Physical
     Location of COs and
     POs
Awaiting Crystal Gateway Lease
Renovations to Move to Two
Locations
03/31/94
                                                                                   Analysis of Pilot  03/31/97
         35   Use Other Contract
              Types
                             Select Candidate to Pilot
                             Multiple Awards
                                   03/31/94
          Draft Solicitation Provisions
          and Contract Clauses on Use of
          Hybrid Contracts Will be Part
          of Solicitation Selected for
          the Pilot          04/30/94

-------
                                      RESOURCE MANAGEMENT COMMITTEE REPORT

                                                FEBRUARY 28,  1994

                                               ACTIONS IN PROGRESS
LEAD
OFFICE %
ACTIONS IK PROGRESS: OBJECTIVES
NEXT ACTION tlATE
PROJECTED PRODUCT AND
CpMPLETtON DATE
; .COAM

. OARM
8,9 Strengthen FMFIA
18 Certification of Agency
Project Officers
25 Independent Government Cost
Estimates (IGCEs)
36,38 Develop Policy on Indirect
Cost and Seek Amendments to
EPAAR and FAR
7 Establish Senior Resource
Officials
Recommend New Approach Based 03/15/94
on Green Border Comments and
Agency Streamlining Efforts
Re-issue Green Border 03/31/94
Complete Green Border Review 04/30/94
Enactment of Cabinet Level
Bill which includes
recommendations made by the
SCCM/RMC for Items 36 and 38
Green Border Comments Resolved 3/15/94
EPA Order to be Signed
Issue Final Guidance
Document 05/30/94
Guidance in Chapter 7 of CMM
05/30/94
Final IGCE "How-to" Guide
06/30/94
FAR Revisions - Nine Months
After Congressional Action
EPAAR Revisions - One Year
After Congressional Action
EPA Order Signed 03/15/94
oc
14   Workforce  Planning  (Balance
     of  Intramural  to  Extramural
	Resources)	
Interviews with EPA Regional    03/25/94
and Laboratory Personnel
Advisory Panel Meeting	04/12/94
                                                                                       Final Report Due   05/31/94

-------
LEAD
OFFICE
ACTIONS IN PROGRESS:  OBJECTIVES
NEXT ACTION
                                                                     DATE
                                   PROJECTED PRODUCT  AND
                                       COMPLETION DATE
8E8
DETAILEE

OHRM

21 Establish Mandatory
Training for all POs,
Managers, and SESs
22 Develop Training Course
for POs and WAMs
23 Upgrade EPAs Education
Requirement for Procurement
Professionals
34 Educate Contract Personnel on
Use of Procurement Sanctions
30,31 Career Track/Grade
Structure/ Awards
32 Evaluate Disciplinary System
Pilot Session of CBT Version 03/25/94
of New Employees Orientation
Pilot Session of CBT Version
of Contracts Overview 03/25/94
Disseminate Supervisors/ 04/40/94
Managers Module to Regions
Course Development and Design 04/30/94
Issue Revised Guidance in 06/30/94
Contracts Management Manual
Circulate Proposed Guidance 04/30/94
within OAM for Comments
Issue Draft Career Guidance 03/30/94
Document for Review and
Comment
Projected Date of Agency 05/01/94
Awards Ceremony; Contract
Management Award Winners
Recognized
EPA Order on SES Conduct & 03/01/94
Discipline Policy awaiting
Administrator's Signature
Strategy, Framework, and
Transition Plan 04/94
Course Development and
Design 04/30/94
Issue Revised Chapter in CMM
06/30/94
Issue Revised Guidance in
CMM 06/30/94
Issue Final Package for
Implementation 05/30/94
OAM Issues Handbook on
Contract Awards 04/30/94
Incorporate Into Agency
Disciplinary System
03/31/94

-------
LEAD
OFFICE
ACTIONS IK PROGRESS:  OBJECTIVES
NEXT ACTION
DATE
PROJECTED PRODUCT AND
    COMPLETION DATE
OIRM     37    Develop an Integrated
              Contract Management
              Information System
                                    First  End-User's  Bulletin
                                    Issued

                                    Contracts Delivery  Order
                                    Tracking System (CDOTS)
                                    Becomes Operational
                     03/10/94
                                                                              06/30/94
        Functional Prototype
        Completed  09/30/94
 jvo      40   Reconcile Personal Property
              System with Integrated
              Financial Management System
                                    Present Cost-Benefit  Analysis
                                    to  Senior  Management  for
                                    Approval.   Prepare
                                    Implementation  Plan.
                     03/31/94
        Implementation of Personal
        Property System 09/30/95

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




          FEBRUARY 28,  1994




          ACTIONS  COMPLETED
1 ACTIONS COMPLETED:
ORGANIZATIONAL OBJECTIVES

1

Recommendations 1-4
15
16
17
33
39
Reorganized Office of Administration and
Revised FY93 Budget Request
Gave Priority to Acquisition Management
Appointed SES to Lead Training Program
Use IGCEs to Analyze Contractor Costs
Policy Memorandum Dated: 03/03/93
Adherence to Prompt Pay Act
Report Issued Dated: 12/17/92
Resources Management

in FY94

Contact: Paul Schaffer
Telephone #:
Contact: Dennis Schur,
Telephone #:




, EPA, HQ
202-260-9032
EPA, RTF
919-541-3041

-------
                                   RESOURCE MANAGEMENT COMMITTEE REPORT

                                             FEBRUARY 28, 1994

                                             ACTIONS COMPLETED
 ACTIONS COMPLETED:   PRODUCT
 Recommendations   5  Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
	Contact:  Document Distribution Unit, 202-260-8573	

               6, 12  Issued Chapter 14 to Contracts Management Manual establishing requirement for
                      "contracting team" concept for individual contracts from award to close out.
	Dated: February 18, 1994	Contact: Paul Schaffer, EPA/QAM 202-260-9032	

                  10  Issued revision to Chapter 1 to Contracts Management Manual requiring Contract
                      Management Plans for all major contracts.
                  11  Issued revision to Chapter 1 to the Contracts Management Manual requiring Annual
                      Acquisition Plans defining contract needs.
	Dated: February 18, 1994	Contact; Fifi Goodfellow, EPA/QAM  202-260-6000	

              19, 20  Completed Training Sessions with Deputy Ethics Officials;
	Ethics Orientation Courses given January, April, and July, 1993	

                  24  Procurement Guidance Documents Indexed, Contact:  Ed Murphy, EPA, OAM, 202-260-6034
	26  Issue Monthly Contract Management Policy Bulletins, Contact;  Ed Murphy,  OAM	

                  27  Identified Procurement Responsibilities in Job Announcements
                  28  Emphasized Contract Management in Performance Agreements
                  29  Described Acquisition Management in Positions Descriptions
                      Requirements Memorandum Dated:  09/30/92
                      OHRM Policy and Research Division Advisory #93-1008  Dated:  09/29/92
                      Contact:  Hector E. Suarez. 202-260-3308                       	_^_

-------
              UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                          WASHINGTON, D.C. 20460
                             FEB  1
                                                              OFFICE OF
                                                            ADMINISTRATION
                                                            ANDRESOURCES
                                                             MANAGEMENT
MEMORANDUM

SUBJECT:   Distribution—©*f  Resource Management Committee  (formerly
           Standing Committee on Contracts  Management) Material
FROM:
TO:
June Macke?
Resource Me.

All EPA
  fgement Committee

>raries
     Attached please  find the January  31,  1994 update  of the
Resource Management Committee Recommendations.  The monthly
report  summarizes the current status of  actions in three
categories:   Open Actions,  Actions in  Progress, and Completed
Actions.

     We will continue to send you the  monthly progress reports
for your information.   If you have questions, please contact me
on  (202)  260-0198.
Attachment
                                                         Recycled/Recyclable
                                                         Printed with Soy/Canola Ink on paper that
                                                         contains at least 50% recycled fiber

-------
                    Monthly Status Report on

   Standing Committee on Contracts Management Recommendations

          from the Resource Management Committee Staff


     This Monthly Status Report provides  an update of progress
made on the forty recommendations in EPA's June 1992 report
Contracts Management at EPA:   Managing Our Mission;
Recommendations of the Standing Committee on Contracts
Management.

     The actions described in this Report address improvements in
EPA's contract management.   Because EPA uses contracts for a wide
range of goods and services,  accountable contracts management is
essential to the overall sound management of the Agency.

     By June 1993, the scope of the Standing Committee on
Contracts Management was expanded to include assistance and
relevant aspects of financial management, as well as acquisition.
The Committee was renamed the Resource Management Committee.
The Monthly Status Report is organized into 3 sections by the
current status of the actions:

     o  2 Charts for work in progress:

           Open Actions:  Key decisions still need to be made by
           the Committee.

           Actions in Progress:  The approach to these actions
           has been approved and implementation plans are
           underway.

           Both of these charts are organized by lead office.
           The charts list the objective, the current status and
           projected product completion date.

     o  1 Chart for completed work:

           Completed Actions:  Actions completed with a contact
           point, if appropriate, for the final product.

     Copies of the June 1992 report and this Monthly Status
Report are available in EPA libraries.  For further information
on the Resource Management Committee, please contact the
Committee staff at  (202) 260-4600.

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




         JANURARY 31,  1994




            OPEN ACTIONS
LEAD I
omCB OPEN ACTIONS: OBJECTIVES
NEXT ACTION DATE
PROJECTED PRODUCT AND
COMPLETION DATE

OAM

13 Pilot Physical
Location of COs and
POs
35 Use Other Contract
Types
Awaiting Crystal Gateway Lease 03/31/94
Renovations to Move to Two
Locations
Presenting Progress Report to 02/15/94
Committee
Analysis of Pilot 03/31/97
Draft Solicitation Provisions
and Contract Clauses on Use of
Hybrid Contracts Will be Part
of Solicitation Selected for
the Pilot 04/01/94

-------
 LEAD
 OFFICE
ACTIONS IN PROGRESS:  OBJECTIVES
           NEXT ACTION
                                                                     DATE
                                              PROJECTED PRODUCT AKD
                                                  COMPLETION DATE
OARM
    Establish Senior Resource
    Officials
Green Border comments resolved  02/25/94
final to be signed	
                                                                                        EPA Order Signed  02/25/94
               Workforce Planning
                                    Complete Interviews with EPA
                                    Regional and Laboratory
                                    Personnel
                                02/22/94
                                                                                         Initial Report Due  02/28/94
BBS
DETAILBB


21 Establish Mandatory
Training for all POs,
Managers, and SESs
22 Develop Training Course
for POs and WANs
23 Upgrade EPAs Education
Requirement for Procurement
Professionals
34 Educate Contract Personnel on
Use of Procurement Sanctions
Pilot Session of CBT Version 02/28/94
of New Employees Orientation
Pilot Session of CBT Version
of Contracts overview 02/28/94
Disseminate Supervisors/ 01/31/94
Managers Module to Regions
Course Development and Design 03/30/94
Circulate Proposed Guidance 02/01/94
within 0AM for Comments
Circulate Proposed Guidance 02/01/94
within 0AM for Comments
Strategy, Framework, and
Transition Plan 02/94
Course Development and
Design 03/30/94
Issue Revised Guidance in
CMM 06/30/94
Issue Revised Guidance in
CMM 06/30/94

-------
RESOURCE MANAGEMENT COMMITTEE REPORT




          JANUARY 31, 1994




        ACTIONS  IN  PROGRESS
XiBAD
OFFICE
ACTIONS IN PROGRESS: OBJECTIVES
NEXT ACTION DATE
PROJECTED PRODUCT AMD
COMPLETION BATE
BOAM 6,12 Factory Floor Team
8,9 Strenghten FMFIA
10 Contract Management Plans
11 Annual Acquisition Plans
IS Certification of Agency
Project Officers
25 Independent Government Cost
Estimates (IGCEs)
36,38 Develop Policy on Indirect
Cost and Seek Amendments to
EPAAR and FAR
Issue Chapter 15 of CMM in
Final
Complete Re-evaluation of
Approach based on Green Border
Comments
Issue Chapter 1 of CMM in
Final
Issue Chapter 1 of CMM in
Final
Re-issue Green Border
Complete Green Border Review
Update Committee on Progress
by CAAC and Congress
02/01/94
02/15/94
02/01/94
02/01/94
02/28/94
04/30/94
03/15/94
Guidance in Chapter 15 of
CMM 02/15/94
Appendix L Incorporated in
CMM 02/28/94
Guidance in Chapter 1 of CMM
02/15/94
Guidance in Chapter 1 of CMM
02/15/94
Guidance in Chapter 7 of CMM
04/30/94
Final IGCE "How-to" Guide
06/30/94
FAR Revisions - Six Months
After Congressional Action

-------
LEAD
OFFICE
ACTIONS IN PROGRESS:  OBJECTIVES
NEXT ACTION
DATE
PROJECTED PRODUCT AND
    COMPLETION DATE
OHRM

30,31 Career Track/Grade
Structure/Awards
32 Evaluate Disciplinary System
Meet with Focus Groups to 01/24-
Collect Additional Data 02/16/94
Projected Date of Agency 05/01/94
Awards Ceremony; Contract
Management Award Winners
Recognized
Complete Reconciliation of 02/01/94
Green Border Comments
Issue Final Package for
Implementation 05/30/94
0AM Issues Handbook with
Chapter on Contract Awards
03/31/94
Incorporate Into Agency
Disciplinary System
03/31/94
' OIRM
!
t

AO
37 Develop an Integrated
Contract Management
Information System

40 Reconcile Personal Property
System with Integrated
Financial Management System
First End-User's Bulletin 02/28/94
Issued
Contracts Delivery Order 06/30/94
Tracking System (COOTS)
Becomes Operational

Finalize Cost-Benefit Analysis 02/28/94
and Clarify Requirement for
Independent Government Cost
Estimate Requirement
Functional Prototype
Completed 09/30/94

Implementation of Personal
Property System 09/30/95

-------
                                   RESOURCE MANAGEMENT  COMMITTEE  REPORT




                                             JANUARY 31,  1994




                                            ACTIONS COMPLETED
ACTIONS COMPLBTBti:  ' ORQAHIZATIOHAI. OBJECTIVE*
Recommendations 1-4  Reorganized Office  of Administration and Resources Management
                 15  Revised  FY93  Budget  Request
                 16  Gave  Priority to  Acquisition Management  in  FY94
                 17  Appointed  SES to  Lead  Training  Program
ACTIONS COHPW5TB01 '  PRODUCT
Recommendations 5
19,
24
26
27
28
29
Cookbook entitled "How to Get Contracts Awarded at EPA" distributed 12/30/93
Contact: Document Distribution Unit, 202-260-8573
20 Completed Training Sessions with Deputy Ethics Officials;
Ethics Orientation Courses given January, April, and July
Procurement Guidance Documents Indexed, Contact: Ed Murphy,
Issue Monthly Contract Management Policy Bulletins, Contact:
Indentified Procurement Responsibilities in Job Announcements
Emphasized Contract Management in Performance Agreements
Described Acquisition Management in Positions Descriptions
Requirements Memorandum Dated: 09/30/92
OHRM Policy and Research Division Advisory #93-1008 Dated:
Contact: Hector E. Suarez, 202-260-3308
, 1993
EPA, 0AM,
Ed Murphy
09/29/92

202-260-6034
, 0AM


-------
ACTIONS COMPLETED*   ORGANIZATIONAL OBJECTIVES
Recommendations  33
Use IGCEs to Analyze Contractor Costs
Policy Memorandum Dated:  03/03/93
                                                                 Contact:  Paul Schaffer, EPA, HQ
                                                                           Telephone ff: 202-260-9032
                 39  Adherence to Prompt Pay Act
                     Report Issued Dated:  12/17/92
                                            Contact:  Dennis Schur, EPA, RTP
                                                      Telephone #:  919-541-3041

-------
              UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                          WASHINGTON. D.C. 20460
                              NOV - 2 1993
                                                              OFFICE OF
                                                            ADMINISTRATION
                                                            AND RESOURCES
                                                             MANAGEMENT
MEMORANDUM      /-v
	    sS         /      /      ~~
SUBJECT:  Reswrce,.Manaoemjent.Commattee Update

FROM:    ^allyanne KarperT Acting Assistant  Administrator

TO:       Members, Resource  Management Cpmmittee
     Attached please find  the October 31,  1993,  update of  the
Resource  Management Committee Recommendations.   The report
summarizes  the current status of actions  in  three categories:
Open Actions,  Actions in Progress, and Completed Actions.

     This document has been sent to the staffs  of Senator
Mikulski, Senator Glenn, Congressman Dingell, and Congressman
Stokes  for  their information.

     Please contact Brigid Rapp of my staff  at  260-9238  if you
have any  questions.

Attachment
                                                        Recycled/Recyclable
                                                        Primed with Soy/Canola Ink on pape'ina t
                                                        contains at least 50% recycled flbet

-------
                                       RESOURCE MANAGEMENT COMMITTEE REPORT

                                                 OCTOBER 31, 1993

                                                   OPEN ACTIONS
LEAD
OFFICE
 OPEN ACTIONSt   OBJECTIVES
          NEXT ACTION
DATE
PROJECTED PRODUCT AND
    COMPLETION DATE
OAM

13 Pilot Physical
Location of COs and
POs
35 Use Other Contract
Types
Awaiting Crystal Gateway Lease 01/31/94
Renovations to Move to Two
Locations
Presenting Progress Report to 12/08/93
Committee
Analysis of Pilot 01/31/97
CMM Draft Guidance on Use of
Hybrid Contracts 12/31/93
OIRM
37   Develop an Integrated
     Contract Management
     Information System
New Project Manager Reviewing
Requirements and Assessing
Current Approach
                                                                         11/15/93
        Develop a Working Prototype
        12/31/93

-------
                                       RESOURCE MANAGEMENT COMMITTEE REPORT

                                                 OCTOBER 31, 1993

                                                ACTIONS IN PROGRESS
LEAD
OFFICE
ACTIONS IN PROGRESS:  OBJECTIVES
NEXT ACTION
DATE
PROJECTED PRODUCT AND
    COMPLETION DATE
IOAM

5
6,12
8,9
10
11
18
25
26
Quality Action Team
Factory Floor Team
Strengthen FMFIA
Contract Management Plans
Annual Acquisition Plans
Certification of Agency POs
Independent Government
Estimates
Issue Uniform Contract
Management Guidance
Mass Distribution of Draft
Cookbook Throughout EPA
Resolving Internal Comments
from Green Border
Resolving Comments from Green
Border
Resolving Comments from Green
Border
Resolving Comments from Green
Border
Resolving Comments/Non-
Concurrences from Green Border
Guide with Management and
Organization Division
Currently Assessing Whether to
Proceed with Green Border
Complete Review of Existing
Guidance
11/30/93
11/15/93
12/31/93
11/15/93
11/15/93
12/31/93
11/15/93
11/30/93
Draft Cookbook Completed
11/30/93
Guidance in Chapter 15 of
CMM 11/15/93
Appendix L Incorporated in
CMM 01/31/94
Guidance in Chapter 1 of CMM
11/15/93
Guidance in Chapter 1 of CMM
11/15/93
Guidance in Chapter 7 of CMM
02/07/94
Final IGCE How-to-Guide
01/31/94
Existing Uniform Guidance
Reconciled and Regular
Policy Bulletins 11/30/93

-------
  LEAD
  OFFICE
 ACTIONS IN PROGRESS:   OBJECTIVES
           NEXT ACTION
DATE
PROJECTED PRODUCT AND
    COMPLETION DATE
   0AM
36,38 Develop Policy on Indirect
      Cost and Seek Amendments
      to EPAAR and FAR
Update Committee on Progress    12/08/93
by CAAC and Congress
        FAR Revisions - Six Months
        after Congressional Action
  OARM
 7   Establish Senior Resource
     Officials
Review and Reconcile Green      12/15/93
Border Comments
                                                                                         EPA Order Signed 12/31/93
           14    Workforce Planning
                                     Compiling Data and              11/30/93
                                     Interviewing Senior Managers
                                          Interim Report Due  12/31/93
   8ES
DETAILEB
 21   Establish  Mandatory
     Training for  all  POs,
     Managers,  and SESs
New Resource Management         11/15/93
Orientation Options to be
Selected

New Employees Orientation       11/93
New Supervisors' & Managers     11/93
Modules to be Piloted
        Resource Management
        Curriculum/Strategy
        Developed  12/93
           22    Develop Training Course
                for POs and WAMs
                                     WAM Project Management
                                     Contents Developed
                                11/01/93
        Proposed Curriculum Design
        and Strategy 12/93
           23    Upgrade EPAs Education
                Requirement for Procurement
                Professionals
                                     Reviewing Existing
                                     Requirements in Acquisition
                                     Handbook and CMM and
                                     Correlating with new FAI
                                     Requirements
                                12/31/93
        Issue Revised Guidance in
        CMM 06/30/94

-------
  LEAD
  OFFICE
 ACTIONS IN PROGRESS:  OBJECTIVES
           NEXT ACTION
  DATE
                                                                                   PROJECTED PRODUCT AND
                                                                                       COMPLETION DATE
   8ES
DETAILBE
34   Education Contract Personnel
     on Use of Procurement
     Sanctions
Reviewing Existing
Requirements in Acquisition
Handbook and CHM and
Correlating with new FAI
Requirements
12/31/93
Issue Revised Guidance in
CUM 06/30/94
OHRM

30,31 Career Track/Grade
Structure/ Awards
32 Evaluate Disciplinary System
Review and Input Survey 11/15/93
Questionnaire Data, Produce
Findings Report; Forward
Report to workgroup
Subcommittees
OAM Completes 11/30/93
Evaluation/Selection in Awards
Process
Resolving Comments from Green 11/30/93
Border
Issue Final Package for
Implementation 03/25/94
OAM Issues Handbook with
Chapter on Contract
Management Awards 03/31/94
Incorporate Into Agency
Disciplinary System 12/31/93
   AO
40   Reconcile Personal Property
     System with Integrated
     Financial Management System
Options Presented and Approved
by Committee; Options and
Recommendations to CFO for
Approval
                                                                                11/30/93
          Implementation of Personal
          Property System 02/28/95

-------
                                  RESOURCE MANAGEMENT COMMITTEE REPORT




                                            OCTOBER  31,  1993




                                            ACTIONS COMPLETED
ACTIONS COMPLETEDI
ORGANIZATIONAL OBJECTIVES
Recommendations 1-4  Reorganized Office of Administration and Resources Management
                 15  Revised FY93 Budget Request
                 16  Gave Priority to Acquisition Management in FY94
                 17  Appointed SES to Lead Training Program
ACTIONS COMPLETED:
PRODUCT
Recommendations 19,
24
27
28
29
33
20 Completed Training Sessions with Deputy Ethics Officials;
Ethics Orientation Courses given January, April and July, 1993

Procurement Guidance Documents Indexed, Contact: Ed Murphy, EPA, HQ, 202-260-6034
Indentified Procurement Responsibilities in Job Announcements
Emphasized Contract Management in Performance Agreements
Described Acquisition Management in Positions Descriptions
Requirements Memorandum Dated: 09/30/92
OHRM Policy and Research Division Advisory | 93-1008 Dated: 09/29/92
Contact: Hector E. Suarez, 202-260-3308

Use IGCEs to Analyze Contractor Costs
Policy Memorandum Dated: 03/03/93 Contact: Paul Schaffer, EPA, HQ
Telephone ft: 202-260-9032

-------
ACTIONS COMPLETED:
        ORGANIZATIONAL OBJECTIVES
Recommendations  39
Adherence to Prompt Pay Act
Report Issued Dated:  12/17/92
Contact:  Dennis Schur, EPA,  RTP
          Telephone #:  919-541-3041

-------
RECOMMENDATION UPDATE - June 30, 1993
NO.
1
2
3
4
5
6
7
8
OBJECTIVE
Consolidate Contracts,
Grants, etc. Functions in
Reorganization
Establish Acquisition
Policy Unit
Establish Separate
Suspension/Debarment
Function
Analyze
OARM/RTP/ Cincinnati
Reporting Relationship
Launch Quality Action Team
to Improve Procurement
Process
Establish Factory Floor
Teams
Institutionalize SPO
Position
Require Internal
Vulnerability Assessment
(Combined with
Recommendation #9)
LEAD
OA
OA
OA
OA
0AM
0AM
DAA-
OARM
0AM
COMPLETION
DATE
Completed
Completed
Completed
Completed
07/13/93
07/15/93
09/30/93
12/31/93
NEXT ACTION
Implement Validation
Plan
Implement Validation
Plan
Implement Validation
Plan
Implement Validation
Plan
Present Proposed
Strategy for
Implementing Top Five
Recommendations to
SCCM
Receive and Evaluate
Agency Comments
Initiate Green Border
on EPA Order
RMD Issues Technical
Guidance for Preparing
FMFIA Annual Report
NEXT
ACTION
DATE
Long-Term
Long-Term
Long-Term
Long-Term
07/13/93
07/01/93
07/12/93
09/15/93

-------
NO.
9
10
11
12
13
14
15
16
17
OBJECTIVE
Strengthen FMFIA Process
(Combined with
Recommendation #8)
Require Contract
Management Plans
Require Offices to Submit
Annual Acquisition Plans
Define Contracting Team
Concept
Pilot Delegation of
Procurement Authority to
Program Offices
Require Workforce Planning
(Inherent Government
Functions)
Revise FY 93 Budget
Request
Give Priority to
Acquisition Management in
FY 94
Appoint SES to Lead
Training Program
LEAD
OC
0AM
OAM
0AM
OAM
OC
OC
OC
AA-
OARM
COMPLETION
DATE
12/31/93
07/30/93
07/30/93
07/15/93
03/31/96
03/01/94
Completed
Completed
Completed
NEXT ACTION
RMD Issues Technical
Guidance for Preparing
FMFIA Annual Report
Issue Revised Chapter
to CMM on Contracts
Management Plans
Issue Revised Chapter
to CMM on Contracts
Management Plans
Receive and Evaluate
Agency Comments
Working on Logistical
Details for Pilot at
two Sites
OMB Issues Decision on
FY95 Budget Submission
None
Passback has not yet
been Received
Completed
NEXT
ACTION
DATE
09/15/93
07/30/93
07/30/93
07/01/93
08/15/93
03/01/94
Completed
In
Process
Completed

-------
NO.
18
19
20
21
22
23
24
OBJECTIVE
Certify Acquisition
Management Staff
Train All Employees in
Procurement Integrity
(Combined with
Recommendation #20}
Mandatory Orientation in
Acquisition Ethics
(Combined with
Recommendation #19)
Mandatory Training for
Project Officers, etc.
Training Course on
Contract Management
Upgrade EPA's Education
Requirement for
Procurement Officials
Index Existing Guidance
Documents
LEAD
0AM
OGC
OGC
SES-
Detail
SES-
Detail
SES-
Detail
OAM
COMPLETION
DATE
08/10/93
12/31/93
12/31/93
02/01/94
02/01/94
06/30/94
Completed
NEXT ACTION
Presentation of
Recommendation to
Resource Management
Committee
Provide Training in
Ethics and Procurement
Integrity for All EPA
Employees Required to
File a Financial
Disclosure Form
Provide Training in
Ethics and Procurement
Integrity for All EPA
Employees Required to
File a Financial
Disclosure Form
Proposed Curriculum
and Implementation
Schedule Completed
Proposed Curriculum
and Implementation
Schedule Completed
Reviewing Existing
Requirements
Validation Efforts to
Begin
NEXT
ACTION
DATE
07/13/93
12/31/93
12/31/93
09/30/93
09/30/93
12/31/93
Completed

-------
NO.
25
26
27
28
29
30
31
OBJECTIVE
Prepare Cost Estimate
Guide
Issue Uniform Contract
Management Guide
Identify Procurement
Responsibilities in Job
Announcements
Emphasize Contract
Management- in Performance
Agreement
Describe Acquisition
Management in Position
Descriptions
Examine Grade Structure
for Contracts Management
Develop Career Track for
Contracting Managers
LEAD
0AM
0AM
OHRM
OHRM
OHRM
OHRM
OHRM
COMPLETION
DATE
01/31/94
09/30/93
Completed
Completed
Completed
12/30/93
12/30/93
NEXT ACTION
Incorporating
Comments; Begin Green
Border
Complete Review of
Guidance; Develop Plan
for Staffing and
Communications
Validation: Survey to
Verify Inclusion of
Contract Management
Duties
Validation: Survey to
Verify Inclusion of
Contract Management
Duties
Validation: Survey to
Verify Inclusion of
Contract Management
Duties
OHRM Issue Agencywide
Call Letter for Honor
Awards
Present Plan and
Approach to Resource
Management Committee
NEXT
ACTION
DATE
08/30/93
08/01/93
07/31/93
07/31/93
07/31/93
08/15/93
07/13/93

-------
NO.
32
33
34
35
36
37
38
39
40
OBJECTIVE
Evaluate Disciplinary
System
Use IGCE's
Educate on Procurement
Sanctions
Use Other Contract Types
Develop Policy on Indirect
Costs
Develop I CMS
Amend EPAAR and FAR
Adherence to Prompt Pay
'Act
PPSA/IFMS Reconciliation
LEAD
OHRM
0AM
SES-
Detail
0AM
0AM
OIRM
OAM
OC
OA
COMPLETION
DATE
09/30/94
01/31/94
02/01/94
08/01/93
06/30/93
09/30/95
06/30/94
09/30/93
09/30/94
NEXT ACTION
OHRM Completes and
Implements Needed
Amendments to the
Disciplinary System
Incorporate Comments;
Begin Green Border
Proposed Curriculum
and Implementation
Scheduled Completed
Present Outline of
Requirements for
Hybrid Contract Type
to Resource Management
Committee
Quarterly Update to
Resource Management
Committee Due
Definition of Phase I
Quarterly Update to
Resource Management
Committee Due
Final Analysis
Expected from QAT
Presentation to
Resource Management
Committe
NEXT
ACTION
DATE
07/30/93
08/30/93
09/30/93
07/13/93
07/13/93
07/30/93
07/13/93
07/30/93
08/18/93

-------
                    Monthly Status Report on

   Standing Committee on Contracts Management Recommendations

           from the Resource Management Committee Staff


     This Monthly Status Report provides an update of progress
made on the forty recommendations in EPA's June 1992 report
Contracts Management at EPA:   Managing Our Mission;
Recommendations of the Standing Committee on Contracts
Management.

     The recommendations in this Report address improvements in
EPA's management of contracts.  Because EPA uses contracts for a
wide range of goods and services, accountable contracts
management is essential to the overall sound management of the
Agency.

     By June 1993, the scope of the Standing Committee on
Contracts Management was expanded to include assistance and
relevant aspects of financial management, as well as acquisition.
The Committee was renamed the Resource Management Committee.

     The Monthly Status Report lists each recommendation,
summarizes the background and approach-, and outlines milestones
for corrective action.  In addition, the status of progress is
updated monthly on each recommendation.  An overview  chart
provides quick reference information for the recommendations.

     Copies of the June 1992 report and this Monthly Status
Report are available in EPA libraries.  For further information
on the original Committee recommendations or the actions of the
Resource Management Committee, please contact the Committee staff
at  (202) 260-9248.

-------
                                                 June 30,  1993
Objective:
   COMMITTEE REPORT RECOMMENDATION NO.    1

 Consolidate the contracts,  grants,  and suspension
 and debarment functions in an office-level
 organization reporting to a new Deputy Assistant
 Administrator for Finance and Acquisition in OARM
Report Reference:  Page 15, Paragraph la

Lead Office:  Office of Administration

Support Offices:  None
Background:
Approach:
  The Standing Committee report states that adding
  a new Deputy Assistant Administrator position
  will strengthen the organization and will provide
  needed oversight and accountability for
  procurement integrity and effectiveness at the
  highest level of EPA.

OARM will reorganize its contracts functions and
consolidate them within the Office of Acquisition
Management.  The grants and suspension/debarment
functions will be housed in the Office of Grants
and Debarment.  All three functions wi11 report to
a new Deputy Assistant Administrator for Finance
and Acquisition.  The Office of the Comptroller
will report to the Deputy Assistant Administrator
for Finance and Acquisition as well.  The
reorganization proposal will include transferring
the reporting relationship for the contracts
functions located in RTP and Cincinnati to
headquarters.  The proposed reorganization was
circulated under green border review, and
management addressed all comments made during the
review.  The reorganization package describes
organizational problems and their resolutions in
the new structure, benefits to be obtained, and the
proposed organization and functions of the new
offices and divisions.

-------
Milestones:
08/31/92  Initiate green border review of OARM
          reorganization
09/29/92  Completed comment resolution from green
          border review
10/08/92  Decision memo sent to the Deputy
          Administrator for signature
10/23/92  Deputy Administrator signed decision
          memo for reorganization packet
10/29/92  Reorganization packet sent to union for
          review
11/23/92  Union review completed; begin
          implementation
Validation:
A plan for  longitudinal study has been prepared
to assess the success of the reorganization.  It
includes such factors as staff turnovers,
resources for training, and completed FMFIA
milestones.  In addition to quantitative data,
cultural or behavioral changes are to be assessed
through interviews, surveys and focus groups.
The study would not be completed until two years
after the reorganization was initiated to allow
time for working  relationships to be fully
operational.
Current Status:
    COMPLETED.

-------
                                                 June 30,  1993
Objective:
   COMMITTEE REPORT RECOMMENDATION NO.    2

 Establish a separate  acquisition policy,  training,
 and oversight unit within the new office to ensure
 that these critical functions compete successfully
 with contract acquisition and administration for
 resource and management attention.
Report Reference:  Page  15, Paragraph Ic
                   Staff Recommendation #34 - the new  Policy,
                   Training and Oversight Division will have
                   sole  responsibility for issuing guidance
                   for contracts management.

Lead Office:  Office of  Administration

Support Offices:  None

Background:  'Currently not enough resources are devoted to
              adequate contracts policy training and  oversight,
              partly due  to the fact that the responsibility
              for carrying out these functions are scattered
              throughout  different program offices, and few
              resources are Hir^4--"! at these functions.   The
              Standing Committee's recommendation will  create  a
              central office to house these functions,  and
              allow the office to garner more resources.
Approach:
OARM will establish a separate Policy, Training and
Oversight Division within the Office of Acquisition
Management to ensure that these critical functions
compete successfully with contract acquisition and
administration for resources and management
attention.  The proposed reorganization will be
circulated under green border review for Agency
comment.  The final reorganization describes
problems that will be addressed via the new
structure, benefits to be obtained, and the
proposed organization and functions of the new
offices and divisions.

-------
Milestones:
08/31/92  Initiate green border review of OARM
          reorganization
09/29/92  Comment resolution from green border
          review completed
10/08/92  Decision memo sent to the Deputy
          Administrator for signature
10/23/92  Deputy Administrator signed decision
          memo for reorganization packet
10/29/92  Reorganization packet sent to union for
          review
11/23/92  Union review completed; begin
          implementation
validation:
A plan for longitudinal study has been prepared
to assess the success of the reorganization.  It
includes such factors as staff turnovers,
resources for training, and completed FMFIA
milestones.  In addition to quantitative data,
cultural or behavioral changes are to be assessed
through interviews, surveys and focus groups.
The study would not be completed until two years
after the reorganization was initiated to allow
time for working relationships to be fully
operational.
Current  Status:
    COMPLETED.

-------
                                                 June 30,  1993
Objective:
   COMMITTEE REPORT RECOMMENDATION NO.    3

 Establish  a  separate acquisition  policy, training,
 and  oversight unit within the new office to  ensure
 that these critical functions compete  successfully
 with contract acquisition and administration for
 resources  and management attention.
Report Reference:
        Page 15,  Paragraph  Ic
        Staff Recommendation #34  - The  new Policy,
        Training  and  Oversight Division will  have
        sole responsibility for issuing guidance
        for contracts management
Lead Office:   Office  of Administration

Support Offices:   None
Background:
Approach:
  Currently not enough resources are devoted to
  adequate contracts policy training and oversight,
  partly due to the fact that the responsibility
  for carrying out these functions are scattered
  throughout different program offices,  and few
  resources are directed at these functions.  The
  Standing Committee's r-pcommendation will create a
  central office to house these functions, and
  allow the office to garner more resources.

OARM will establish a separate Policy, Training and
Oversight Division within the Office of Acquisition
Management to ensure that these critical functions
compete successfully with contract acquisition and
administration for resources and management
attention.  The proposed reorganization will be
circulated under green border review for Agency
comment.  The final reorganization describes
problems that will be addressed via the new
structure, benefits to be obtained, and the
proposed organization and functions of the new
offices and divisions.
 Milestones:
  08/31/92  Initiate green border for OARM
            reorganization
  09/29/92  Comment resolution from green border
            review complete
  10/03/92  Decision memo sent to the Deputy
            Administrator for signature
  10/23/92  Deputy Administrator signed decision
            memo for reorganization packet
  10/29/92  Reorganization packet sent to union tor
            review
  11/23/92  Union review completed; begin
            implementation

-------
Validation:   A plan for a longitudinal study has been prepared
              to assess the success of the reoganization.   It
              includes such factors as staff turnover,
              resources for training, and completed FMFIA
              milestones.  In addition to quantitative data,
              cultural or behavioral changes are to be assessed
              through interviews, surveys and focus groups.
              The study would not be completed until two years
              after the reorganization was initiated to allow
              time for working relationships to be fully
              operational.

Current  status:   COMPLETED.

-------
Objective:
                                                 June 30,  1993

               COMMITTEE REPORT RECOMMENDATION MO.    4

            Analyze the reporting relationships between the
            new Office of Acquisition Management and the
            contract management functions in Research Triangle
            Park and Cincinnati to determine whether a direct
            reporting relationship would strengthen or weaken
            management accountability and support for these
            field acquisition units.

Report Reference:   Page 15, Paragraph Id

Lead Office:  Office of Administration

Support Offices:   None
Background:
Approach:
Milestones:
             The Standing Committee report indicated the
             importance of clarifying reporting relationships,
             and consolidating the functions within one
             organization.

           Analyze the reporting relationships between the new
           Acquisition Management office and the contract
           management functions in Research Triangle Park and
           Cincinnati to determine whether a direct reporting
           relationship would strengthen or weaken management
           accountability and support for these field
           acquisition units:

             COMPLETED ON 07/31/92.
             Management & Organization Division presented
             findings to the Assistant Administrator for
             Administration and Resources Management, the
             Deputy Assistant Administrator for Management,
             and the Deputy Assistant Administrator for
             Finance and Acquisition.

             Management has decided to implement the following
             reorganizations:

             -To consolidate contracting operations within the
             Agency, the Contracts Management Divisions  from
             Research Triangle Park and Cincinnati will  be
             transferred into OAM

             -To transfer Office of the Comptroller/Financial
             Management Division's functions and
             responsibilities of the National Contracts
             Payment Division in Research Triangle  Park  to the
             Financial Management Division  in Headquarters

             -To revise OARM/RTP's proposed functional
             statements to better reflect  its support  of
             satellite facilities

-------
Validation:   A plan for a longitudinal study has been prepared
              to assess the success of the reorganization.  It
              includes such factors as staff turnover,
              resources for training, and completed FMFIA
              milestones.  In addition to quantitative data,
              cultural or behavioral changes are to be assessed
              through interviews, surveys and focus groups.
              The study would not be completed until two years
              after the reorganization was initiated to allow
              time for working relationships to be fully
              operational.

current  Status:   COMPLETED.

-------
                                                 June  30,  1993

               COMMITTEE REPORT RECOMMENDATION NO.     5


 Objective:   Launch an Agency-level Quality Action Team to
             improve the procurement process.

 Report Reference:   Page 16, Paragraph le
                    Staff Recommendations:
                    #21 - Formation of QAT to study how the
                    Agency can improve contracting processes
                    #31 - Determine where new contract attorney
                    resources should be placed

Lead Office:   Office of Acquisition Management

 Support Offices:   Office of the General Counsel

 Background:  The Standing Committee recognized the fact that
              the Agency has failed to provide clear guidance
              to -its contracting staff in the past, and needs
              to improve information sharing across the Agency
              at all levels, as well as to enhance coordination
              between OARM, OGC, and program offices on
               important contracting matters.

 Approach:  Solicit high-level Agency managers t« ;~ -ticipate
            in the Quality Action Team (QAT).  *^po^ed members
            include managers from OAPM, OGC, OSWER, ORD, OPPTS,
            OPPE, OW, and OAR.  QAT will  focus on improving the
            pre-award procurement process, i.e., lead  time,
            competition, incorporation of better cost  and
            performance controls into contract document itself.
            This project overlaps and dovetails with other
            Standing Committee recommendations - the use of
            different contract types, and the  "Contracting
            Team/Factory Floor" concepts.

-------
 Milestones:
Validation:
08/17/92  Identify QAT members
08/31/92  Hold first meeting, select chair and
          facilitator, clarify charter
10/08/92  QAT to develop milestones and timelines
10/14/92  Deliver interim products and future
          milestones to the Standing Committee
10/15/92  Brainstorm major problem areas
10/15/92  Send out evaluation questions for
          baseline data analysis
11/05/92  Brainstorm short-term solutions
11/24/92  Complete review of change to EPAAR
12/03/92  Collect baseline data through focus
          group for baseline data analysis
12/10/92  Conduct focus group with respondents to
          refine gathered data
12/17/92  QAT present revised charter to Standing
          Committee to include "procurement
          cookbook"
04/01/93  QAT recommendations distributed at SCCM
          Meeting for discussion
05/19/5*3  QAT recommendations presented to SCCM
05/26/93  Draft Cookbook Completed
07/13/93  Present proposed implementation
          strategy to SCCM
08/13/93  Final Cookbook presented to SCCM

 An evaluation plan will be developed to ensure that
 the implemented recommendations  for  change  in the
 procurement process are effective.
 Current Status:
    07/13/93   Present proposed strategy  for
    implementing  top five  recommendations to SCCM

-------
                                                 June  30,  1993

           COMMITTEE REPORT RECOMMENDATION NO.  6  and  12

Objective:     Establish "factory floor"  quality  contracting
               teams to plan,  implement,  and evaluate individual
               contracts.

Report Reference:   Page 16, Paragraph l.f
                    Staff Recommendation:
                    Although this topic was not specifically
                    listed as one of the 68 recommendations in
                    the Standing Committee Staff report,  pages 64
                    and 65 of their report contained  a discussion
                    on the contracting team concept.    The report
                    stated that the team should consist of a PCO,
                    AGO, the COTR's, the Program Office Manager,
                    legal counsel and a cost analyst.  The team
                    would convene upon the conceptualization of
                    the contract and be active through the
                    placement, use, closeout and audit of each
                    contract.
                    #41 - QAT complete report to evaluate need
                    for additional property management personnel,
                    and analysis of decentralizing property
                    management


Lead Office:   Office of Acquisition Management

Support Offices:    Office  of General Counsel, SPO's

Background:    The  Standing Committee endorsed a "contracting
               team" concept to accomplish  life cycle  management
               of contracts from award to contract completion.

Approach: OAM will  develop  a chapter on  the quality  contracting
          team concept which will  be placed in the Contracts
          Management Manual and  implement  a pilot program.

Milestones:    10/21/92   Brief SCCM members
               11/04/92   Receive comments  from SCCM
               11/24/92   Brief SCCM on revised guidance
               12/18/92   Letter  issued by Deputy Director,
                          Finance and Acquisition, asking SCCM
                          program offices to select an  upcoming
                          acquisition to  be used  to implement a
                          two  year  pilot  quality  contracting team
               01/03/93   Draft  initial  chapter
               02/02/93   OAM  receives  pilot selections and
                          program points  of contacts  and programs
                          commence  advance acquisition meetings
                          with pilot members
                4/28/93   Status of pilots presented  to SCCM

-------
                05/07/93   Obtain  OAM/OGC/SPO comments
                05/15/93   Initiate  Green Border Review
                07/01/93   Receive and  evaluate Agency comments
                07/15/93   0AM issues revised chapter and
                          implements quality contracting teams
                          Agencywide
                09/01/93   0AM issues evaluation forms to SCCM
                          asking  them  to critique pilot to date
                09/3,0/93   First quarterly report to SCCM on both
                          pilot programs and Agencywide
                          implementation.  Other reports will be
                          issued  in January, April, July and
                          October of each year.
                1/15/95   Pilots  evaluated and chapter revised, if
                          necessary, to incorporate needed changes

Validation:     Pilot:
                -The effectiveness  of  the pilot will be validated
                through use of surveys and questionnaires.

                Short-Term:
                -Starting in FY94,  OAM's Quality Assurance Staff
                will evaluate effectiveness of the quality
                contracting team's  involvement during pre-award
                reviews and contract management reviews.

                Long-Term:
                -After award, the quality contracting team will
                meet semi-annually. At each meeting, each member
                of the quality contracting team will be required
                to perform an evaluation as to how he/she rates
                contract management to date at scheduled meetings.
                In addition, a team member will act as a recorder
                and document the  problems addressed, and the
                recommendations made to correct those problems.
                -The project will be a success  if the quality
                contracting teams provide for: continuity in
                accountability; consistency in approaches to
                resolving contract problems throughout the  life of
                the contract; and evidence of  "program buy-in" and
                the use of other expertise in  solving contract
                management problems.   By June  30,  1996, OAM will
                perform an analysis to determine whether  life-
                cycle management is a workable  and  practical
                concept for EPA contracts and  if  the  above  goals
                have been met.

Currant  Status:     Green border review still  ongoing

-------
Objective:
                                    June 30,  1993

       COMMITTEE REPORT RECOMMENDATION NO.  7

 Institutionalize Senior  Procurement Official  (SPO)
position in EPA  programs and regions by issuing formal
guidance and delegations to define responsibilities and
define requirements for certification by OARM
Report Reference: Page 16,  Paragraph 2.a

Lead Office:  Deputy Assistant Administrator,  Office of
              Administration and Resources Management

Support Offices:  Office of Acquisition Management
Background:
Approach:
Milestones:
 The Standing Committee reported that EPA should
 establish and institutionalize the Senior Procurement
 Official position in EPA programs and regions by
 issuing formal guidance and delegations to defir°
 responsibilities and defining requirements for
 certification by OARM.  It was determined that a
 single point of management accountability should be
 established for the management of contracts and that
 this should be undertaken Agency wide.  One individual
 needed to have the tuj.j. responsibility for the
 effectiveness and integrity of all procurement
 activities, including contract administration, in
 his/her office.  The accountability for contracting
 management should not be delegated by the SPO.

 OARM originally intended to prepare an expanded
 definition of the SPO position including a position
 description and a plan of how to proceed. After
 further analysis it was decided that the Senior
 Procurement Official should not only focus on contract
 management but also have managerial oversight
 responsibility for all extramural resources.  This
 position is now more appropriately called a Senior
 Resource Official.  An institutionalization plan will
 be devised  for the SRO position in programs, and
 regional offices.

 08/05/92    OARM developed an expanded definition of
             the SPO position.  COMPLETED.
 08/19/92    Initial draft of SPO position description
             circulated   for   comment.     COMPLETED.
              (Rough draft of  SPO position description
             initially    discussed   during   RA/ARA
             conference held 7/92 in Washington,  D.C.)
 10/30/92    Comments  rendered and revisions  being
             made.  COMPLETED.
 11/10/92    Revised SPO position  description
             presented at SCCM meeting  and circulated
              for comment.   COMPLETED.   Memorandum
              dated  11/17/92 requesting  comments  by
              12/11/92.

-------
             05/30/93     Action  plan  completed to establish
                          Senior  Resource Officials.
                          COMPLETED. EPA Order in draft  formally
                          designating  these officials.
             7/12/93      Initiate green border process  on EPA
                          Order.
             8/12/93      Complete green border process  and begin
                          resolution of comments.
               9/9/93      First Agencywide SRO meeting
               9/30/93     EPA Order signed.


Validation:  Short-Term:
             -SRO's have been placed  in every office and they
             are performing their prescribed duties.

             Long Term:
             -M&O should perform a management study to
             verify that this position is properly  interfacing
             with program and procurement personnel within  the
             organization approximately twelve  (12) months  after
             this position is institutionalized  in  the  Contracts
             Management Manual.  Incorporate a description of the
             duties and responsibilities of the  SRO in  current
             contract management training materials, such as the
             Contract Administration course hanc"   :- ss well as
             the Contracts Management Manual.

Current  Status:   PRELIMINARY COMMENTS WERE REQUESTED BY JUNE 11,
                  1993 AND ARE CURRENTLY BEING REVIEWED.
                  EPA ORDER TO ENTER GREEN BORDER
                  PROCESS BY THE MIDDLE OF JULY  ESTABLISHING THE
                  SRO ROLES AND RESPONSIBILITIES.

-------
                                                 June 30,  1993

           COMMITTEE REPORT RECOMMENDATION NO.  8  and 9


Objective:     Strengthen the Federal Managers  Financial
               Integrity Act (FMFIA)  process to more effectively
               identify weaknesses and vulnerabilities,
               particularly those in the area of  contract
               management.

Report Reference:   Page 16, Paragraph l.f
                    Staff Recommendation #44 - All  SES managers,
                    OD's and Division Directors should recertify
                    their FMFIA responsibilities  as they apply to
                    contract management through a course
                    coordinated through the EPA Institute and
                    conducted by their Management Control
                    Coordinators.
                    #63 - Written report submitted to DA
                    detailing actions taken to comply with 69
                    recommendations in reports along with a
                    schedule for compliance for any actions not
                    completed by 10/1/93.  A similar report is
                    required each October 1, thereafter until all
                    recommendations 1 *ve been i:r,-'l»  .nted
                    #64 - Written report submitcea co the Deputy
                    Administrator detailing the state of
                    contracts management in their offices


Lead Office:   Office of the Comptroller, Resource Management
               Division

Support Offices:    Office  of Acquisition Management

Background:    The  Standing Committee milestone  #8  recommends
               that EPA use the checklist  in Appendix L of the
               Standing Committee staff  report.  Milestone #9
               recommends that the FMFIA process be  strengthened
               to more effectively identify contract  management
               vulnerabilities.  These two milestones have been
               combined because of their common  management
               integrity  focus.

Approach: RMD will  complete three actions.   First,  RMD  will
          review the FMFIA  process and recommend improvements.
          RMD and OAM will  also  revise Appendix  L,  as
          appropriate, to be  issued  Agency-wide  as a directive
          and in conjunction  with the annual  FMFIA guidance.  The
          checklist will  serve as an internal  control for
          managers  contracts  management  programs.   RMD will  then
          work with the  SES training manager and OAM to develop
          training  on  FMFIA contract management  responsibilities.

-------
          as well  as  a module to incorporate into the existing
          contract management courses.

          The  intent  of staff recommendations #63 and #64  will  be
          met  institutionally through the FMFIA process.   Because
          contract management is an Agency material weakness,
          each office will be required to address contract
          management  in their response to the Agency's technical
          guidance call letter.   In addition, because of  the
          certification process and new performance standards
          which are currently being implemented,  the Agency has a
          mechanism in place to address contract management
          performance related deficiencies.
Milestones:
Appendix L Checklist

07/15/92  Accountable Officials  (AO) Network,
                         EPA's cadre of senior
                         leaders chartered by the
                         Deputy Administrator to
                         correct. EPA's 17 material
                         weaknesses, discussed the
                         suggested checklist in
                         Appendix L of the
                         Standing Committee staff
                         report.  Th-> AO's
                         believed that while the
                         checklist appeared to
                         have merit, it should be
                         distributed Agency-wide
                         for comments first to
                         ensure that it had the
                         appropriate questions and
                         focus
08/04/92  HMD received comments on Appendix L from
          managers.  HMD and the AOs determined
          that  it required revisions before
          releasing as a FMFIA requirement
12/30/92  RMD/OAM resolve AO comments and OAM
          finalizes Appendix L
02/14/93  OAM develops a draft Agency directive,
          incorporating Appendix L
03/11/93  RMD and OAM will present to the SCCM
          their approach to more effectively
          identify contract management weaknesses
          and vulnerabilities through the FMFIA
          process
05/01/93  OAM issues memo directing managers to
          use the draft directive developed  from
          Appendix L as a management: control tool.
          OAM circulates draft  for comment
06/01/93  OAM initiates Green Border Review  for
          directive developed from Appendix  L and
          adds  it to the Contract Management

-------
               09/15/93




               09/30/93

               12/31/93

               1994




               Training

               04/01/93
               06/01/93
               08/01/93
          Manual
          RMD issues technical  guidance for
          preparing FMFIA Annual Report requiring
          offices to report the results of their
          assessment in their FMFIA report
          OAM completes Green Border process and
          adds final chapter to CMM
          RMD assures FMFIA final report is sent
          to President and Congress
          OAM reviews Office Appendix L directive
          assessments for any office contract
          management oversight audits scheduled
          RMD works with designated SES manager
          responsible for developing EPA's
          contract management curriculum to ensure
          the effective integration of management
          integrity principles and
          responsibilities in accordance with
          FMFIA legislation.
          RMD participates in test pilot of
          contract management course developed by
          SES manager.
          RMD advises MCC of new co^ract
          management training and linkage with
          FMFIA responsibilities
Validation:
Through training course evaluations and analysis
of program vulnerability reports,  the success of
steps to utilize the FMFIA process as a contract
management control will be evaluated.
Current status:
     Green Border process still ongoing

-------
                                                  June 30, 1993

                COMMITTEE  REPORT RECOMMENDATION NO.    10

 Objective:   Require Contract Management Plans for all major
              contracts as defined in Chapter 1 of the Contracts
              Management Manual.  Planning would include  methods
              for scheduling and tracking of WAs or DOs,
              financial monitoring, scheduling of award fee
              activities, exercise of options, etc.   These plans
              should also specify program roles,  resources, and
              responsibilities in managing the contract;
              identify key vulnerabilities inherent in the
              contract and describe provisions for dealing with
              these; and establish milestones for key decisions
              and actions.

 Report Reference:   Page 16, paragraph 2d

Lead Office:    Office of Acquisition Management
Background:
Approach:
Milestones:
The staff report recommended that the contract
management team prepare a milestone chart for
their proposed contract.  This plan would go
beyond the acquisition plan to involve post-award
activities including those items included in
"Objective" ami t»c..»._d"<1 ing team meetings for each
contract year through contract closeout.
(Paragraph I V.B.I., page 65)

OAM will develop guidance regarding the
formulation of contract management plans.  Each
contract management plan should be succinct, 1 to
1 1/2 pages.   As a pilot, each SCCM member will
do one plan to get experience with tt"2 process.

10/14/92
11/20/92
01/14/93
02/03/93
02/03/93
04/01/93
04/15/93
05/04/93

07/30/93
Issue interim guidance and brief SCCM
Obtain OAM/OGC comments
Revised guidance provided to SCCM
Review comments
Pilot plans drafted by SCCM members
Initiate Green Border review
OAM will brief SCCM on plans received
Receive and evaluate Agency comments and
disseminate model plan by OIRM
Issue revised chapter to Contracts
Management Manual on contracts
management plans

-------
Validation:   Short-Term:
              -By  June  1,  1993,   OAM's  Policy  and Oversight
              Branch will  check  evidence  of contract  management
              plans at  all pre-award  review.

              Long-Term:
              -By  February 1,  1996, a study should  be performed
              assessing the results of  audits  performed on
              various programs prior  to and after
              implementation of  this  recommendation to
              ascertain whether  this  planning  method has
              resulted  in  better contract management.

Current Status:   Green Border comments still  being resolved.

-------
Objective:
                                    June  30, 1993

 COMMITTEE  REPORT  RECOMMENDATION NO.    11

 Require all offices to submit an Annual
 Acquisition Plan to define contract needs,
 beginning in FY93, including where appropriate, an
 A-76 analysis,  a description of how contracts will
 be managed, special contracting needs  (e.g., quick
 response services), vulnerabilities (e.g.,
 handling of sensitive data)  supplier data,
 supplier capabilities, and internal capacity to
 manage contracts and other extramural  support.
 Report Reference:   Page 16, paragraph 2.e
 Lead Office:   Office of Acquisition Management
 Support Offices:
 Background:
Approach:
     Assistant Administrators and Regional
     Administrators

Although Chapter 1 of the Contracts Management
Manual requires that contracting officers and
program officials prepare an annual acquisition
plan and an individual acquisition plan each time
they are about to1 enter into a complex, high
dollar procurement, the Agancy has still been
vulnerable because of the lack of advance
planning in regards to preparing strategy for
overall contractual needs.  This lack of advance
planning has resulted in restricted competition,
increased prices and not enough resources to
manage resultant contracts.

 Integrate accountability for program results and
 contract management at strategic levels.   By
 preparing an annual acquisition plan,  this will
 ensure that contractual needs,  resources,  and
 vulnerabilities are defined in the early stages.

-------
 Milestones:
Validation:
             10/14/92  Issue guidance to Agency;  OARM to flow
                       chart process
             11/01/92  Obtain OAM/CMD/OGC comments
             01/14/93  Issue revised guidance to SCCM members
             02/03/93  Receive comments from SCCM
             04/01/93  Initiate green border review
             05/04/93  Receive and evaluate Agency comments
             06/30/93  Annual acquisition plans forwarded to
                       0AM
             07/30/93  Issue revised Chapter to Contracts
                       Management Manual on acquisition
                       planning
              Short-Term:
              After revising the Contract Management Manual to
              require annual acquisition plans at the beginning
              of each fiscal year,  each Branch Chief in OAM will
              meet with the program offices to determine the
              amount of appropriate resources and institute
              safeguards for areas of potential vulnerabilities.
              This use of strategic planning should result in
              less justifications for full and open competition
              and better contract management.

              Long-Term:
              By March 1,  1996, OAM should conduct a management
              study to assess the results of audits performed on
              various programs prior to and after implementation
              of this recommendation; the study should ascertain
              whether this strategic planning method has
              resulted in better contract management.

Current Status:   Green  Border  comments  still  being  resolved.

-------
                                               June  30, 1993

               COMMITTEE  REPORT  RECOMMENDATION NO.    13

Objective:   Design and implement, if appropriate,  a pilot test
             of more extensive and formal delegation of
             procurement authority to one or more program
             offices and regions to make program offices and
             regions more accountable for contract management.

Report Reference:   Page 17, Paragraph 2.g
                    Staff Recommendation:
                    #10 - Submit Implementation Plan to OAM
                    outlining the restructuring of the roles
                    and responsibilities of contract
                    administration personnel
                    #38 - Implementation Plans initiated

Lead Office:   Office of Acquisition Management

Support Offices:   None
Background:
Approach:
  The Standing Committee Staff Report recommended a
  complete restructuring of the Contract
  Administration function, with Administrative
  Contracting Officers reporting to the Senior
  Procurement Officials within each program office.
  The Standing Committee's own report took
  exception to that recommendation in the Staff
  Report, and agreed only to a study of the
  feasibility of the Staff recommendation.  They
  agreed to consider alternative models, and design
  and implement, if appropriate, a pilot test of
  more extensive and formal delegation of
  procurement authority to one or more program
  offices and regions to make program offices and
  regions more accountable for contract management.

The Standing Committee will study the implications
of redelegating procurement authority to the
program offices, if appropriate, and will implement
a pilot program, consider alternatives, or elect
net to implement the recommendation of the staff.
The Office of Acquisition Management has been
working closely with the Office of Solid Waste and
Emergency Response in designing a "model1* for
testing the co-location of Contracting Officers and
Contract Specialists with the Project Officers.
This model has been presented to the Standing
Committee for their consideration, and details are
being worked out between OARM and OSWER.  The pilot
program  is proposed for a three year period.

-------
Milestones:   09/24/92




              09/30/92



              10/14/92




              10/15/92





              10/21/92




              11/15/92



              03/01/93
              08/15/93

              12/01/93

              03/01/94




              02/31/94

              06/01/94




              09/31/94

              CY 1995

              06/31/95



              06/31/96



              09/31/96
 OSWER DAA and  Office  Directors  will
 finalize  the proposed model  for "co-
 location" of Contracting  Officers  with
 program office personnel  (COMPLETED)
 OSWER will present its proposal for the
 design of the  pilot project  to  the
 Standing  Committee (COMPLETED)
 Additional information,  including
 contracts to be included  in  the pilot,
 will be presented to  the  Standing
 Committee (COMPLETED)
 Definition and details of pilot project
 will be initiated; A  and  OSWER  will
 identify  staffing needs and  logistical
 problems, and  begin to develop
 Implementation Plan (COMPLETED)
 Update of Status will be  provided  to
 Standing  Committee.  Pilot program will
 be approved in concept by Standing
 Committee (COMPLETED)
 OARM and  OSWER will negotiate extent
 and details of pilot  program
 (COMPLETED)
 Plans for logistics will  be  approved
 Pilot program  begins; Implementation
 Plan initiated
 Quarterly status reports will be
 presented to Standing Committee
- 09/15/94 Management  Assistance Review
 will be performed to  evaluate first  six
 months of pilot program;  results will
 be presented to Standing Committee
 Additional validation efforts will be
 performed
 OSWER and OAM  will present analysis of
 first year of  pilot program to Standing
 Committee; any proposed changes will  be
 recommended
 Changes to pilot program will be
 implemented
 Semiannual status reports will be
 presented to Standing Committee
 Further validation efforts will occur;
 results will be presented to Standing
 Committee
 Final validation efforts will  occur;
 results will be presented to Standing
 Committee
 OAM and OSWER will submit analysis of
 pilot program to Assistant
 Administrator, OARM

-------
Validation:    Validation  testing  will occur after the first six
               months  of the pilot program, through a Management
               Assistance  Review,  and  at  the end of each of
               the  three years in the pilot.   The pilot program
               will  be evaluated to  determine the  following:

               1. Has  the  program  office  assumed more
               accountability for  contract  management  issues? In
               particular, has the Program  Management  concept
               been effective?

               2. Have the attitudes and  behavior  of the Project
               Officers, Work Assignment  Managers,  and higher-
               level managers within the  Program Office changed
               to reflect  a greater  commitment  to,  and
               understanding of, good  contract  management
               principles?

               3. Have the Administrative Contracting  Officers
               developed a better  understanding of the program
               office's issues and needs?

               4. Have the Administrative Contracting  Officers
               retained their ability  to  exercise  independent
               judgements and make good business decisions?

               5. Has  the overall  contract  management  process
                improved in terms of  timeliness and quality?

                6.  Does the pilot work better for  some  types of
               contracts than others?

                7.   Are more resources necessary to properly
                administer OSWER contracts?   To effectively
                conduct the pilot?

                Validation will occur through the use of:

                - a Management Assistance Review will be requested
                of the Assistant Administrator, OARM, after the
                first six months of the pilot program

                - periodic questionnaires to CS's,  ACO's, PO's,
                WAM's,  and PM's

                - surveys  and  interviews with.OSWER and A
                managers

                - audits by  the Office of Inspector General
                and/or the General Accounting Office,  if
                appropriate   (It may be determined  feasible to
                request  the  IG to  come in and evaluate the
                pilot,  rather than wait for their periodic  audit
                program)

-------
              - tracking the processing of individual work
                assignment actions

Current Status:  OSWER and OARM are working on logistical
                 details  for implementing pilot at two sites
                 by August 1993.  Space  for the pilot has been
                 identified at two locations and logistical
                 arrangements are now  being made for start-up
                 -to begin as soon as possible.

-------
                                                  June *30, 1993

                      COMMITTEE  RECOMMENDATION NO. 14

Objective:      Require EPA program and regional strategic plans,
                annual budgets,  and  operating  plans  to reflect
                formal workforce planning  and justify the proposed
                mix  of intramural and  extramural resources.

 Report Reference:   Page 17, Paragraph 2h
                     Staff Recommendation:
                     #1 - Budget Division will  be  responsible
                     for implementation of OMB  Circular A-76
                     activities which are currently in RMD
                     #32 - Prepare a plan for executing long-
                     term contract planning
                     #39 - Using guidance developed by OAM on
                     the appropriate use of contractors, each
                     program office will determine if the Agency
                     should perform certain tasks  in-house as
                     opposed to contracting out, and develop  its
                     overall resource allocation accordingly.
                     #59 - Develop a plan of action with
                     milestones to fully integrate strategic,
                     budget and acquisition planning processes

 Lead Office:   Office of Comptroller

 Support Offices:   Office of Acquisition Management

 Background:   The Standing Committee believed that EPA needed a
               planning process that assured the best use of EPA
               FTE's and contractors to accomplish its mission.

Approach:  As part of the effort to link acquisition management
           and budget, the development of the FY94 OMB budget
           submission has included an effort to review the
           contract workforce to bring into better balance the mix
           of intramural and extramural resources.

           For FY95's budget, the budget technical call letter
           will include a request for extramural resources
           management  information.  The FY95 budget will also
           include a thorough base review.  It is planned that an
           independent analysis of the Agency's balance of
           intramural  and extramural resources will be completed
           in FY94.  This analysis will provide another management
           tool to justify proposed mix of resources.

           Senior Resource Officials will provide a focal point
           for extramural resources.  Through an integrated
           strategic  leadership council of top managers, planning
           and budgeting processes will be aligned with Agency
           management  integrity processes.  In addition, contract
           guidance will be  issued on  functions appropriate  for

-------
         contracts.

Milestones:   07/21/92


              09/01/92

              01/31/93
              03/01/93

              03/01/93

              03/17/93
              06/24/93
              07/13/93
Validation:
         Agency officials  identified  contractor
         workyears  that  should  be converted  to
         Government employee  workyears
         OMB submission  of contractor conversion
         request
         Deputy Assistant  Administrator's Office
         Directors  identifies program and
         regional models,  and researches how to
         strengthen budget technical  call letter
         for management  information
         OAM issues guidance  on the appropriate
         use of contractors
         OMB issues decision  on FY94  budget
         submission
         Finance  and Acquisition Office
         Directors  develop strategy and present
         to SCCM
         Agency call letter for FY95 issued.
         Action Plan Presented  to Committee for
         Review and Approval
Short-Term:
-By October 1,  1995,  Budget Division will perform
a study to determine if funds set aside in the
budget for contract-related issues were used for
its intended purpose (procure more contract
management resources and to allow more work to be
performed in-house)
Long-Term:
-By October 1,  1996,  OAM will perform a
management study ascertaining whether contract
management has improved due to the increased
resources.
-By October 1,  1996,  OAM will perform a study
measuring the benefits of having more work
performed in-house (i.e., more cost effective,
less contracts issued which are vulnerable to
abuse).
 Current  status:
    Program offices in process of gathering data
    for submittal in response to Agency technical
    call letter dated June 24, 1993.

-------
                                                  June 30, 1993
                 COMMITTEE REPORT RECOMMENDATION NO.
                                          15
 Objective:   Request appropriate revisions in EPA's  FY93  budget
              request now pending before Congress to  increase
              staffing levels of the central acquisitions
              functions, legal counsel support, and program and
              regional contract management functions.

 Report Reference:   Page 17, Paragraph 3a
 Lead Office:

 Support Office:
      Office of Comptroller

      None
Background:
   In addition to voicinq concerns over the  lack of
   resources available to support acquisition
   functions, virtually every focus group raised the
   inadequacy of staff to perform contracts
   management training as a major problem.   Although
   EPA is committed to allocating additional
   resources to strengthen contract management in
   FY92 and FY93, in order to ensure the efficiency
   and integrity of EFA'- acquisitio-  *-.,..agement
   functions, an increase in FY93's budget is needed.
 Approach:
Validation:
The Office of Comptroller  (OC) informally notified
Appropriations Committees of the Agency's workforce
needs for contract management in FY93 and noted
that any FTE caps should accommodate the Agency's
contract workforce needs.

The Agency went to OMB with a formal request for
FTE for these specific purposes but there was no
increase in our FTE ceiling for FY93.  However, the
Administrator reprogrammed staff throughout the
Agency to support contracts management.

   Quarterly reports are issued stating how the
   reallocated resources are supporting contracts
   management
 Current Statuss   COMPLETED.

-------
                                            June 30,  1993

                 COMMITTEE REPORT RECOMMENDATION NO.   16

 Objective:   Give priority to acquisition management functions
             in EPA FY94 budget request to ensure appropriate
             staffing for acquisition management functions
             throughout EPA.

 Report Reference:   Page 17,  paragraph 3b

 Lead Office:   Office of Comptroller

 Support Offices:   Office of Acquisition Management

 Background:   The Standing Committee believed that the Agency
              needed to allocate more resources to increase
              accountability for, and improve oversight over
              contract management.
Approach:
The thrust of the Agency's FY94 request to the OMB
's its contract management workyear request.  In
response to a request by the Assistant
Administrator for OARM,  CAM initiated a listing
containing current and future contracts and the
FTE's devoted to them to determine if the Agency
had the appropriate staff to manage its upcoming
contracts.

The Administrator allowed critical OAM FY93
vacancies to be filled in spite of hiring freezes
in other areas.  The Administrator also
reprogrammed FY93 staff throughout the. Agency to
support contract management.  The Agency has
almost met its goal for reallocating positions to
contracts management for FY92 and FY9"1.
Milestones:
validation:
Current Status:
09/01/92  FY94 budget submission forwarded to OMB
03/01/93  OMB issues decision on FY94 submission

For FY95's budget, the budget technical call
letter will include a request for extramural
resources management information.  The FY95 budget
will also include a thorough base review.  It is
planned that an independent analysis of the
Agency's balance of intramural and extramural
resources will be completed in FY94.  This
analysis will provide another management  tool to
justify proposed mix of resources.

     Completed.  Additional FTE's requested;
     however, FY94 budget passback has not been
     received.

-------
                                                 June 30,  1993
                COMMITTEE REPORT RECOMMENDATION NO.
                                         17
 Objective:
Appoint a SES-level employee with the training
qualifications and quality management experience
to lead the development of this comprehensive
training program.
 Report Reference:   Page 17,  Paragraph 4.a

 Lead Office:   Office of the  Assistant Administrator  for
                Administration and Resources Management

 Support Offices:   Office of  Human Resources Management
 Background:
Approach:
 Many of the recommendations of the Standing
 Committee  are for the development of various
 training courses in contract management.  These
 efforts, when completed, would amount to a major
 overhaul of the contracts training program as it
 exists today.  The Standing Committee recommended
 that, to ensure that this comprehensive training
 program would receive the full-time, high level
 attention  required for  success, and reflect the
 needs of the programs,  a Senior E*-f.\:—ve Service
 Member from an EPA program office be ietailed to
 lead this  effort over a six to twelve month
 period.

  The Standing Committee members will submit names
  of nominees to OARM.  The Acting Deputy Assistant
  Administrator for Finance and Acquisition as well
  as the Assistant Administrator will interview
  interested candidates  for this position and select
  a person  with the necessary background and
  experience.  Due to the difficulties encountered
  in locating an appropriate candidate,  it has been
  agreed that if a qualified SES member cannot be
  found, that either an  individual in the SES
  Candidate Program or a GM-15 will be considered.

  When the  individual detailed to this position
  comes on  board, he or  she will take the approach
  of assessing the entire field of contracts-related
  courses «nich are being conducted throughout the
  Agency, then developing a strategy for a
  comprehensive effort to restructure the program.
  This will include reviewing and examining training
  courses developed in  (and conducted by) program
  and regional offices,  OHRM, and OAM.  After this
  evaluation  is completed, the SES  (or GM-15)
  detailee  will begin to work with the appropriate
  support offices t« take a comprehensive, overall

-------
               approach  to  implementing  Recommendations  No.  19,
               20,  21, 22,  and  34.   Since  the  courses  covered by
               these recommendations are dependent  upon  this
               preliminary  assessment and  strategy  development,
               few milestones have  been  set forth at this time
               for those five recommendations.   Additional
               milestones for Nos.  19, 20, 21,  22,  and 34 will be
               created after the assessment has been performed.
Milestones:
 11/18/92   SES  Candidate  of  GM-15  will  be selected
           by the  Deputy  Assistant Administrator
           (COMPLETED)
 12/07/92   Candidate will begin  detail  to OARM
 Validation:
This recommendation will be considered to have
been successfully completed if the candidate is
detailed to OARM by 12/01/92 and successfully
leads this major training effort for the Agency.
Success will be determined by adherence to
schedule, actual development of appropriate
courses, quality of those courses, and
recognition throughout the Agency (and outside)
that EPA's training program in contracts
management meets the -~~ds of contrar*- -management
personnel and those other employee . »r.- are
associated with contracts.  Validation efforts
performed for Recommendations No. 19, 20, 21, 22,
23, and 34 will also determine whether this
program is successful in changing the behavior
and attitudes of Agency employees with regard to
contract management.
 Current Status:  COMPLETED.

-------
                                            June  30, 1993

                    COMMITTEE  REPORT  RECOMMENDATION NO. 18

Objective:  Require periodic  certification by  the Agency's
            Procurement Executive of all Agency senior executives,
            managers and staff who perform acquisition management
            functions to ensure that  their  training and performance
            warrant their being entrusted  with acquisition
            responsibilities.   Certification of SES members should
            be  integrated with the SES certification process.

Report Reference:   Pages 16-17, paragraph  4.b

Lead Office:  Office of Administration Resources  Management
               (OAM - Manager)

Support Office:   Office of Human Resources Management

Background:   This recommendation ties into the staff report
              discussion on training.  Individuals who were certified
              many years ago may not  be aware of recent changes  in
              procurement regulations, thereby being unable to  carry
              out acquisition  management responsibilities in  an
              effective, efficient, ,..-»nner.

Approach:  Review current certification requirements and evaluate
           whether other requirements are  necessary.  OAM will
           undertake the process of  formally  incorporating
           certification requirements into the Agency's
           directives systems by developing coverage  in  Chapter 7
           of the Contracts Management Manual  (CMM).  This
           coverage will:  1)   define those employee*  for whom   .
           certification will be required, e.g. all those with
           significant acquisition  management  responsibilities  in
           their performance  standards; 2) identify a process for
           submission of certification data;  and 3) establish a
           schedule for periodic certification of those Agency
           employees identified under item one above  so that all
           such employees are certified at least once every  three
           years.  SES employees are scheduled for
           recertification by October 1,  1994.
Milestones:   08/12/92    OAM put together short concept document.
                          COMPLETED.
              09/30/92    OHRH coordinates with OPM on
                          incorporating acquisition management
                          certification in the SES certification
                          process.  COMPLETED.
              12/30/92    Disseminate results of Performance
                          Review  &o*rd meeting discussing their
                          recommendation for revising the SES
                          recertification process. COMPLETED.

-------
Validation
 03/30/93    OAM  to  provide  an  analysis  of  the  best
            methodology  to  address  certification  of
            various Agency  acquisition  managers.
            COMPLETED.
 06/18/93    Complete development  of draft  Agency
            directive  in Contracts  Management
            Manual. OAM  to  coordinate methodology
            for  incorporating  certification
            procedures for  all Agency resource
            management,  including grants,  CFO
            advisors and FMFIA officials.
            ^Completed.   OAM scheduled  to  present
            this recommendation before  the SCCM
            during  the July meeting. All subsequent
            milestones are  revised  to reflect  this.
 07/30/93    Incorporate  SCCM comments and  issue
            draft CMM  change for  green  border
            review. OAM will  review concurrently.
 08/10/93    Receive, evaluate, and  resolve internal
            OAM/CMD/OGC  comments.
 09/10/93    Receive, evaluate, and  resolve Agency
            comments.
 11/10/93    Issue directive.

Long-Term:
-The SPO must assure that certificatio- processes
are in place before individuals are recommended for
contract management duties.  In addition they should
perform periodic random  checks to verify that active
contract managers have complied with required
certification processes. These checks  should include
looking at a selected number of individuals and
their certifications as  well as cross  referencing
with OAM Project Officer Record System to determine
that adequate records on the Agency's  contract
managers are being maintained.  Chapter 7 of the CMM
will be revised to require that SPO's  certify to the
Procurement Executive that their contract managers
have been trained and are performing satisfactorily.
Current status:
    MILESTONES REVISED.  OAM MANAGEMENT, IN
    CONJUNCTION WITH OHRM,(TRAINING) AND OARM
    (INCORPORATING GRANTS AND FINANCIAL MANAGEMENT)
    HAVE DETERMINED HOW TO APPROPRIATELY HANDLE
    CERTIFICATION FOR VARIOUS LEVELS OF ACQUISITION
    MANAGERS.  PRESENTATION SCHEDULED BEFORE THE
    COMMITTEE ON JULY 13, 1993.

-------
Objective:
                                    June  30,  1993

   COMMITTEE  REPORT  RECOMMENDATION NO.    19

 Require that all employees receive training in
 procurement integrity by January 1993 as part of
 the ethics training program.
Report Reference:   Page 18, paragraph 4.c

Lead Office:   Office of General Counsel
Support Offices:
       Office of Acquisition Management
       Office of Human Resources Management
       SES Detailee
Background:
Approach:
  The Standing Committee has recommended the
  permanent establishment of the most comprehensive
  training program in the history of EPA in order
  to change the embedded attitudes responsible for
  "cutting corners" in contract management.  The
  Development of this training in procurement
  integrity is one part of this overall effort.

Because of the logistical problems inherent in
attempting to train over 18,000 employees by
January 1993, OGC is developing a package of
written material *-o '— delivered to all employees
by that date.  This material will also be provided
to all new employees hired after December 31, 1992.
The longer term objective will be to put in place a
formal training course in accordance with Executive
Order No. 12674, and the Office of Government
Ethics Regulations, which provide for Government-
wide training in this area for all employees who
are required to file a Financial Disclosure
Statement.
Milestones:   10/16/92
               12/31/92
               12/31/93
            OGC will conduct a  "train the trainers"
            session for the Deputy Ethics Officials
            in each program office to discuss how
            the training  course required by the
            Executive  Order will be provided
             (COMPLETED)
            OGC will provide written material on
            the subject of procurement  integrity to
            all EPA employees  (COMPLETED)
            Provide training in ethics  and
            procurement integrity  for all EPA
            employees  required  to  file  a Financial
            Disclosure Statement

-------
Validation:   Short-Term:
              -In  order to determine the effectiveness of this
              training, all participants will be requested to
              evaluate the course after each training session;
              part of that evaluation will  include comments  on
              whether additional coverage or other items should
              be  included  in  the training.  The course will  be
              modified as  necessary.  In addition, if
              appropriate, tests or other measures will be used
              to determine whether students have achieved the
              desired skill or knowledge level.

              Long-Term :
              -Review OGC  records to determine how many
              employees received Ethics training in  CY  1993.
              Survey employees through a questionnaire  to
              assess whether, in the long term, they thought
              the training was valuable, and they had increased
                    knowledge ir the subject matter.
Current Status:   On target.  OGC has completed the training
                  session with the Deputy Ethics Officials in
                  each program office.   OGC conducted an ethics
                  orientation through the EPA Institute in
                  January and a^^her in early April.  One is
                  scheduled in early July.  These are general
                  ethics courses that also touch on procurement
                  integrity issues.

-------
                                                June 30, 1993
               COMMITTEE  REPORT RECOMMENDATION NO.
                                                     20
Objective:
            Establish a mandatory orientation program in
            acquisition ethics and operating principles for
            all new EPA employees that  is tailored to EPA's
            specific requirements.
Report Reference:   Page 18, Paragraph 4.d

Lead Office:   Office of General Counsel

Support Offices:
Background:
                  Office  of Human Resources Management Office
                  of Acquisition Management
                  SES  Detailee

             The Standing Committee has  recommended the
             permanent establishment  of  the most comprehensive
             training  program in the  history of EPA in order
             to change the embedded attitudes responsible for
             "cutting  corners"  in contract management.  The
             development  of this training in acquisition
             ethics and operating principles is one part of
             this overall effort.

           The Standing Committee agreed that this effort
           could be incorporated ir*-o the ethics training.
            (Recommendation #19.)  See Recommendation  #19 for
           approach.

             This recommendation has  been combined with
             Recommendation  #19.  See Recommendation  #19 for
             milestones.

             Short-Term:
             -In order to determine the  effectiveness of this
             training, all participants  will be requested to
             evaluate  the course after each training  session;
             part of that evaluation  will include comments on
             whether additional coverage or other items should
             be  included  in  the training.  The course will be
             modified  as  necessary.
             -If appropriate,  tests or other measures will be
             used to determine whether students have  achieved
             the desired  skill or  knowledge  level.

             Long-Term:
             -Review OGC  records  to determine how many
             employees received Ethics training  in  CY 1993.
             Survey employees through a questionnaire to
             assess whether,  in the  long term, they thought
             the training was valuable,  and  they had increased
             their  knowledge in the  subject  matter.

Current Status:   On target.   (See Recommendation #19.)
Approach:
Milestones:
Validation:

-------
                                                June 30,  1993
               COMMITTEE REPORT RECOMMENDATION NO.
                                         21
Objective:
 Establish mandatory training, including periodic
 refresher courses, in acquisition ethics,
 policies, and management methods for all EPA
 Project Officers, Managers, and Senior Executives
Report Reference:
        Page  18,  Paragraph  4.e
        Staff Recommendation:
        #26 - Develop  an  orientation on contracts
        management  and guide for writing work
        assignments, procurement requests,  etc., to
        acclimate newcomers to  contracts management
        #27 - Incorporate a COI training unit  into
        the contracts  administration training
        courses
        #52 - Develop  training  for ACO's and COTR's
        on invoice  review with  certification of
        attendance  as  a standard job prerequisite:
Lead Office:   SES Detailee
Support Offices:
       Office of Human Resources
       Office of Acquisition Management
Background:
 Approach:
  The Standing Committee has recommended the
  permanent establishment of the most comprehensive
  training program in the history of EPA in order
  to change the embedded attitudes responsible for
  "cutting corners" in contract management.  The
  development of this mandatory training and
  periodic refresher courses for Project Officers,
  managers, and senior executives is one part of
  this overall effort.

The approach for this training will be determined
after the SES or GM-15 detailee conducts an
assessment of all existing contracts-related
training and develops a strategy for the overall
training initiative.
 Milestones:   02/17/93



              04/01/93




              06/01/93

              06/15/93


              09/30/93
            Overall strategy/workplan to
            restructure contracts management
            training program completed and
            presented to Standing Committee
            Preliminary assessment of existing
            training programs completed and sent
            out to Standing Committee
            members.(COMPLETED)
            Identification of desired job
            performance will be completed
            Objectives for training program will  be
            articulated.  Organizational support
            systems  for training will be assessed
            Proposed curriculum and  implementation
            schedule completed

-------
Validation:   Short-Term:
              -In order to determine the effectiveness of this
              training, all participants will be requested to
              evaluate these courses after each training
              session.  Part of that evaluation will include
              comments on whether additional coverage or other
              items should be included in the training.  The
              courses will be modified as necessary.  In
              addition, if appropriate, tests or other measures
              will be used to determine whether students have
              achieved the desired skill or knowledge level.

              Long-Term:
              -Review C/OHRM records on an annual basis to
              determine how many employees received this
              training.  Survey employees through a
              questionnaire to assess whether, in the long
              term, they thought the training was valuable, and
              they had increased their knowledge in the sui-ject
              matter.


Current Status:   Work on identifying desired job performance
                  and  impediments to good performance in
                  contracts management is ongoing;  four focus
                  groups in Headquarters and one in the Regions
                  have been conducted; input from National
                  Performance Review  focus groups is also being
                  used.

                  A survey of training needs has been sent  to
                  EPA  SESers to determine the focus of the  next
                  round  of executive  courses.

                  Work on the revised core curriculum course  on
                  resource management has been  completed; the
                  course is to be delivered  on  June 30.

                  Development of courses  for new employees,  new
                  appointees, now members of the SES  and  new
                  managers  is underway  also.

-------
                                                June 30,  1993
               COMMITTEE REPORT RECOMMENDATION NO.
                                          22
Objective:
 Develop a  practical  training  course that  instructs
 Managers and  Project Officers on how  to manage
 contracts,  control costs,  evaluate performance,
 encourage  quality, and negotiate terms.
Report Reference:
        Page 18,  Paragraph 4.f
        Staff Recommendation:
        #19 - Publish a "Lessons Learned"  report
        summarizing the results of all  GAO and OIG
        audits on contracts management
        #22 - Develop a guidance package,  including
        video, for performance evaluation  boards
        #30 - Distribute the  "Lessons Learned"
        report to managers with contract
        responsibilities
        #36 - Prepare detailed guidance document
        and videotape en policy on personal
        services
        #45 - Agency's contract training curriculum
        is adapted to include property  management
        #49 - First seminar prepared on short,
        topical issues in contracts management
Lead Offi.e:   SES  Detailee
Support Offices:
Background:
Approach:
       Office of Human Resources Management Office
       of Acquisition Management

  The Standing Committee has recommended the
  permanent establishment of the most comprehensive
  training program in the history of EPA in order
  to change the embedded attitudes responsible for
  "cutting corners" in contract management.  The
  development of this practical training course for
  Project Officers and managers is one part of this
  overall effort.
The approach for this training will be determined
after the SES or GM-15 detailee conducts an
assessment of all existing contracts-related
training and develops a strategy for the overall
training initiative.

-------
Milestones:   02/17/93  Overall strategy/workplan to
                        restructure contracts management
                        training program completed and
                        presented to Standing Committee
              04/01/93  Preliminary assessment of existing
                        training programs in contracts
                        management will be completed
                        (COMPLETED)
              06/01/93  Identification of desired job
                        performance will be completed
              06/15/93  Objectives for training program will be
                        articulated.  Organizational support
                        systems for training will be assessed
              09/30/93  Proposed curriculum and implementation
                        schedule completed


Validation:   Short-Term:
              -In order to determine the effectiveness of this
              training, all participants will be requested to
              evaluate the course after each training session.
              Part of that evaluation will include comments on
              whether additional coverage or other items should
              be included in the training.  The course will be
              modified as necessary.  In addition, if
              appropriate, tests or other measures will be used
              to determine whether students have achieved the
              desired skill or knowledge level.

              Long-term:
              -Review IL/OHRM records on an annual basis to
              determine how many employees received this
              training.  Survey employees through a
              questionnaire to assess whether, in the long
              term, they thought the training was valuable, and
              they had increased their knowledge in the subject
              matter.

-------
Current Status:  Work on  identifying desired job performance
                 and impediments to good performance in
                 contracts management  is ongoing; four focus
                 groups in Headquarters and one in the Regions
                 have been conducted;  input from the National
                 Performance  Review focus groups is also  being
                 used.

                 A survey of  training  needs has been sent to
                 EPA SESers to determine the  focus of the next
                 round of executive courses.

                 Work on  the  revised core curriculum course on
                 resource management has been completed;   the
                 course  is to be delivered  on June  30.

                 Development  of courses  for new employees,  new
                 appointees,  new members of the SES  and  new
                 managers is  undexway  also.

-------
Objective:
                                                June 30, 1993

               COMMITTEE REPORT RECOMMENDATION NO.   23

             Upgrade EPA's Education Requirement for
             Procurement Professionals in EPA.
Report Reference:
                    Page 18, Paragraph 4.g
                    Staff Recommendation:
                    #20 - Individual Development Plans or
                    Training Plans are used to supplement the
                    technical expertise already found in the
                    organization
                    #47 - Examine contracts management training
                    courses and upgrade or replace them with
                    course's tailored to specific roles and
                    responsibilities
Lead Office:   SES Detailee
Support Offices:

Background:
                   Office of Acquisition Management
Approach:
              The Standing Committee has recommended the
              permanent establishment of the most comprehensive
              training program in the history of EPA in order
              to change the embedded attitudes, responsible for
              "cutting corners" in contract management.  The
              upgrading of EPA's education requirements for
              Procurement Professionals is one part of this
              overall effort.

            The Office of Procurement Policy issued Policy
            Letter 92-3 on June 24, 1992.  The purpose of the
            Letter is to establish a Government-wide standard
            for skill-based training in performing contracting
            duties.  The Letter requires Agencies to provide a
            description of the Agency's plan for prescribing
            and providing training; a description of actions
            taken or planned to assess the extent to which
            training courses provide skill training; and a
            description of the Agency's system for certifying
            and reporting the completion of training
            requirements .

            The Agency's response to the Policy Letter will
            form the basis for EPA's procurement career
            management program and for our approach to this
            Recommendation of the Standing Committee.

-------
Milestones:
Validation:
10/31/92   Integrate  approach  with  response  to  the
          OFPP Policy Letter  No. 92-3.
          (COMPLETED)
11/01/92  - 12/31/93   Perform  analysis  of  all
          current procurement training courses to
          determine  the extent to  which they
          provide training in the  78 Units  of
          Instruction in the  Federal Acquisition
          Institute's (FAI) Contract Specialist
          Workbook,  including the  level of  skill
          in each contract management  duty  that
          the training attains.
11/01/92  - 12/31/93   Concurrently  review  existing
          requirements in Unit 15  of the
          Acquisition Handbook and Chapters 7  and
          8 of the Contracts  Management Manual to
          identify areas where improvements are
          needed for additional continuing
          education requirements.   As  course
          analyses are completed,  begin
          development of proposed  revisions to
          pertinent sections  of Unit  15 and
          Chapters 7 and 8.
01/31/94   Issue proposed revised Acquisition
          HandLor:-. .. it and Contracts  Management
          Manual Chapters for internal comment.
02/28/94   Receive internal comments.
03/31/94   Assess and resolve internal  comments,
          initiate Green Border review process
          for revised guidance.
05/30/94   Receive, assess and resolve  Agency
          comments.
06/30/94   Issue revised guidance.

Short-Term:
-In order to determine the effectiveness of any
new education requirements, all affected parties
(contracting personnel as well as program office
procurement professionals) will be requested  to
evaluate all training courses after each training
session.   Part of that evaluation will include
comments on whether additional coverage  in any
subject matter or other courses should be added
or included in the education requirements.  The
courses will be modified, or new courses added,
as necessary.  In addition,  if appropriate, tests
or other measures will be used to determine
whether students have achieved the desired skill
or knowledge  level.

Long-Term:
-Survey procurement professionals to  determine
whether they  feel their  level  of  training  and
education  require»Mt«« are
adequate/excessive/inadequate  to  perform their
functions.

-------
Current Status:   On target.  Work  on identifying desired job
                  performance and impediments to good
                  performance in contracts management is
                  ongoing; four focus groups in Headquarters
                  and one in the Regions have been conducted;
                  input from the National Performance Review
                  focus groups is also being used.

                  A survey of training needs has been sent to
                  EPA SESers to determine the focus of the next
                  round of executive courese.

                  Work on the revised core curriculum course on
                  resource management has been completed; the
                  course is delivered on June 30.

                  Development of courses for new employees, new
                  appointees, new members of the SES and new
                  managers  is underway also.

-------
Objective:
                               June 30, 1993

       COMMITTEE REPORT RECOMMENDATION NO. 24

Provide an updated index of existing guidance documents
 issued  by all  headquarters offices,  regional offices
 and  field labs.
Report Reference:
       Page  18, Paragraph 5.a
       Staff Recomuendation:
       #16  - Each  Office with  its own  guidance on
       contracts  management  compiles  notebooks and
       labels guidance currently  in effect and provides
       copies to OARM  and OGC
       #46 - Review guidance notebooks compiled by the
       SPOs  and identify modifications  required
       #65 - Updated index of all existing guidance is
       issued
Lead Office:  Office of Acquisition Management
Background:
  The  Standing  Committee reported that EPA  should
  provide  an  updated  index of existing guidance
  documents issued by all headquarters offices,  regional
  offices  and field  labs
Approach:
  OAM will  send out  a  letter to  all  SPOs'  requesting
  that they submit information about the procurement
  related guidance documents currently  used within
  their offices.  After  this information is compiled,
  OAM will  devise an index  of all  these guidance
  documents.  This index  will be  disseminated
  throughout the Agency.    After completion of this
  index, guidance should be reviewed and indexed on a
  regular basis to ensure validity,  consistency with
  other Agency guidance,  and compliance with
  Procurement regulations.
Milestones:  09/01/92



             11/01/92


             3/15/93

             4/23/93
              Request SPOs to submit all existing
              guidance in their respective areas.
              COMPLETED.   OAM issued memorandum to all
              SPO's requesting responses by 11/1/92.
              Compile and review submissions.
              COMPLETED.  Submissions received.
              Compilation in process.
              Prepare index and disseminate throughout
              Agency for comment.
              Present index to Standing Committee.
              COMPLETED.   Discussion to be held at
              4/28/93 meeting. COMPLETED.

-------
Validation: Short-Term:
             -OAM  will verify  through telephone  inquiry that all
              existing guidance  documents  have
              been indexed,  and  that all regional  offices and
              laboratories have  received the  index,  and can
              utilize it.

            Long-Term:
            -Use of this index can be verified through random
             checks by OAM commencing within  six (6)
             months after the  index is disseminated  throughout
             the Agency.  The  checks will  determine  if the index
             is relevant,  is it being used, do various offices
             feel  they have adequate access to all the guidance
             information.   Librarians can  validate usage by
             keeping records.
            -OAM will issue a  letter to all SPOs in  January
             of each year requiring a list of contracting
             management  guidance documents that  are  utilized
             within their office.  These lists should be
             compiled and disseminated every  February to all
             SPOs.  This list compilation will commence  in
             January 1994.

Current  Status:    OAM IS INVESTIGATING DISSEMINATING THE
                   INDEX ELECTRONICALLY.  VALIDATIO*'  EFFORTS  ARE
                   UNDERWAY.

-------
Objective:
                                     June OO, 1993

    COMMITTEE REPORT RECOMMENDATION NO.   25

 Prepare cost estimate  guide and develop
 corresponding data bases to assist  with the
 development of valid independent government cost
 estimates (IGCE).
Report Reference:-,
        Page 18,  Paragraph 5.b
        Staff Recommendation:
        #2 - Completion of cost estimating guides
        to assist with development of valid IGCEs
        #4 - Complete analysis of the IGCE
        procedures used for procurement programs
        and determine resource needs for specific
        cost estimators to ensure compliance with
        the IGCE  requirement
Lead Office:   Office  of Acquisition Management

Support Offices:•   None
Background:
Approach:
  Independent Government Cost Estimates (IGCEs)  are
  used in the procurement process to help determine
  the reasonableness of contractors' proposals.
  The IGCEs are developed by technical experts and
  provide information on labor hours b" Category,
  labor rates, materials, and other  ^~^z
  associated with the performance of a specific
  assignment.  The Standing Committee reported that
  EPA utilized poor cost estimating practices and
  procedures and recommended a structured
  corrective approach.

An EPA team will develop a formal IGCE guide to be
used by program and contracting personnel.  The
team will be composed of technical experts from the
program offices and cost accountants from OAM.
This team will-review current EPA guidance,
guidance from other agencies, and procedures used
by private industry.  The generic guide will be
distributed to the field for use, with appropriate
instructions provided.  Data bases will be
established by individual programs as historical
negotiation information is generated.  To be
useful, data bases will have to be continually
updated by program offices.

-------
Milestones:
08/21/92  Establish team
08/30/92  Define types of IGCE manuals
09/21/92  Review internal guidelines
11/20/92  Review other agencies' guidelines
02/09/93  First draft of guidelines issued
03/09/93  Agency comments on draft
03/26/93  Issue final draft guide for field
          testing
03/26/93 - 06/15/93  Field testing of IGCE guide
          by some program offices
06/15/93  Receive comments on draft from offices
          that participated in field test
08/30/93  Incorporate comments and begin Green
          Border
11/30/93  Complete resolution of Green Border
          Review comments
01/31/94  Issue final guide
Validation:
T'-s success  of  the guide will be determined by:
a) feedback  from program offices,- b) the actual
use by program  offices, and  3) the ability of the
IGCE, developed with  the help of the guide, to
assist the Government in negotiations and cost
control.

In order  to  evaluate  the success of the guidance,
OAM will  conduct a survey  of program offices on
their use of the guide, and  query them on how
well they feel  it meets their needs.

Starting  in  FY  94, OAM's Quality Assurance Staff
will evaluate whether IGCEs  are being properly
utilized  during workplan negotiations Curing
regularly scheduled  contract management reviews.
 Current Status:
     Approximately 425 copies of the draft guide
     were distributed for field testing and
     critiquing.  Comments were due back June 15
     and now reconciliation of comments his begun.

-------
                                             June  30,  1993

                   COMMITTEE REPORT RECOMMENDATION NO.  26

Objective:  Issue Uniform Contract Management Guidance

Report Reference:  Page 18,  Paragraph D.S.c
                   Staff Recommendation:
                   #3 - Future contracts  include  provisions that
                   employees of contractors and, subcontractors be
                   trained in personal services restrictions, and
                   that contractors have adequate management
                   structure in place to supervise and control the
                   performance of their employees. (Page 89,
                   Paragraph IV.C.lb(3))
                   #12  -  Guidance  developed  for  analysis  of
                   appropriate  use  of  contractors.   (Page  86,
                   Paragraph IV.C.b.)
                   #14 - Issue Guidance on management of contracts
                   including preparation of SOW's, WA's, DO's and
                   IGE's. (Page 86, Paragraph IV.C.l.b.(1))
                   #23 - Review solicitations and contractors' bids
                   to  avoid COI   and  prepare written  finding of
                   analysis  at  each  appropriate stage of  the
                   procurement (Pages 89-90, Paragraph
                   IV.C.lb(4))
                   #29 - Amend the Acquisition Handbook to
                   address  in more detail the roles and
                   responsibilities of EPA contract attorneys
                   (Page 83, Paragraph IV.B.5.)
                   #43 - Examine where it is possible to  enforce
                   provisions  for denying or reducing payments
                   where performance  is not satisfactory  and
                   issue a  joint policy defining a strategy to
                   enforce  the denied-payment provision.   (Page
                   99, Paragraph  IV.C.S.c.)
                   #53 - Issue a  schedule for revising,
                   replacing,  or  clarifying all guidance
                   requiring modification.  (Page  84, Paragraph
                   IV.C.I.a.(1))
                   #54 - Review standard  contract  language  to
                   determine  if it serves the needs  of  the
                   Agency.   (Page 91,  Paragraph IV.2.b.)
                   #55 - Acquisition  handbook abolished and
                   contents merger with the Contracts Management
                   Manual.  (Page  86,  Paragraph  IV.C.1.a.(3))
                   #56 -  Information  Hotline or electronic
                   bulletin boards established  for contract
                   managers for quick and practical  advice.
                    (Page  85,  Paragraph IV.C.I.a.(2))
                   #57 -  Issue schedule listing the  guidance in
                   development and planning stages.  (Page 85,

                   Paragraph  IV.£,i,a.(1))
                   #60 -  Develop  guidance on the  requisite
                   elements of an invoice under each major
                   contract type  (.Page 98,  Paragraph IV.C.5.a.)

-------
Lead Office:
   Office of Administration Resources Management
   (OAM - Manager)
Background:
Approach:
  The Standing Committee reported that the agency
  needs to eliminate inconsistencies in, and issue
  uniform guidance on, management of contracts
  including the preparation of all procurement
  documents.  The current guidance and policy
  documents on contract management were determined to
  have several flaws:  the information was not easily
  accessible to all Agency contracting managers, there
  were inconsistencies among guidance documents, and
  documents did not reflect the most current
  regulatory information.

OAM will disseminate information throughout the Agency
concerning uniform practices in the preparation of
procurement documents as well as management.  Also OAM
will evaluate other mediums of communication available
throughout the Agency available for dissemination of
procurement guidance.  One medium to be explored is
the use of a hotline or Agency Bulletin Board.  This
medium  may provide Agency contract managers with the
ability to get quick and practical advice for real
situations or an interpretation of existing guidance
co address situations as u.je  arise under contracts.
Milestones:-  09/01/92
              09/30/92
              11/01/92
              2/15/93
              03/01/93




              08/01/93




              09/01/93


              *09/01/93

              *10/01/93
               Issue  request  for copies of any
               program/regional guidance.
               Initiate  analysis of available
               electronic bulletin board options, and
               mechanisms for operating hotlines
               (including interviewing existing hotline
               managers,  such as in FMD) .  COMPLETED.
               Complete  analysis of available bulletin
               board  options, and mechanisms for
               operating hotlines.  COMPLETED.
               Receive guidance.  COMPLETED.
               Complete  interviews with potential users
               to determine topics for bulletin board,
               and preference for a hotline. COMPLETED.
               Select bulletin board* or hotline**  for
               implementation (Schedule to be provided
               for implementation of each
               option) .COMPLETED.
               Complete  review of guidance,  including
               recommendations for change.   ** Develop
               plan for  staffing and
               telecommunications .
               Begin revisions (establish workplan
               depending on receipt of materials)
               ** Announce and implement bulletin  board.
               Complete  programming/coding  of new
               Complete debugging and training,
               implement system.

-------
Approach and Milestones for Staff Recommendations:

             #3 - OAM is currently updating EPA Order 1900.1
              which addresses Personal Services.
              Completion of work is expected by August 1993.  OAM
              is scheduled to begin work on drafting a
              special provision for inclusion into contract
              documents that would ensure that future contracts
              include a provision that contractors and
              subcontractors have adequate management structures
              in place to supervise and control performance of
              their employees.  Work on this EP clause is
              scheduled to commence in July 1993.   This clause
              should be incorporated into APDS by 12/93.

             #12 - EPA Order 1900.1 currently being updated
              Update will provide guidance for appropriately
              using contractor support.

             #1-. - Initial guidance has been issued on the
              preparation of SOW's, WA's, DO's and IGE's.  Some
              of that guidance has been issued as a result of the
              OMB SWAT team initiative addressed under SCCM
              recommendation #36.  OAM is preparing a new chapter
              to the Contracts Management Manual addressing these
              issues as well.  m<* x'irst draft is expected 9/93.
             #23 - OMB is currently reviewing an Agency rule on
              COI.  The guidance incorporated in that rule will
              fulfill this requirement.  The rule is expected to
              be signed and in effect by 9/93.

             #29 - OAM has formed a workgroup to address and
              define the roles and responsibilities of contract
              attorneys.  First meeting was held the week of
              April 5, 1993.   '

             #43 - Recommendation #39, which addresses the Agency
              invoice payment process has an outgrowth QAT which
              was formed to look at various problems and issues
              facing Project Officers in relation to invoice
              review and approval.  The denial or reduction of
              payments for non-satisfactory work is one of the
              issues they are addressing.  Their problem analysis
              and set of recommendations for corrective action is
              expected by 7/93.

             #53 - This staff recommendation is subsumed in
              Standing Committee recommendation #24 which
              requires that an index be compiled listing all
              available guidance documents within the Agency  and
              that index be regularly updated, revised, and
              clarified.

-------
#54 - Unit 23 of the Acquisition Handbook contains
 EPAAR class deviations issued since 1984, which was
 EPAAR's inception date.  Unit 23 contains a total
 of 22 EPAAR deviations, which were granted for
 unique requirements for particular classes of
 contract actions that were not provided for in the
 EPAAR.  OAM reviewed all the current
 EPAAR deviations during FY92.  Work is well
 underway to incorporate these deviations into the
 EPAAR.  The deviations associated with the
 Award Fee language, and Source Selection procedures
 are being handled as a separate EPAAR amendment.
 Although this effort is ongoing, completion of the
 source selection and award fee language is expected
 by 9/93.  The milestone schedule is as follows:

11/15/92  Complete review of Unit 23 to identify
          class deviations for inclusion in EPAAR.
 4/30/93  Complete draft of Federal Register
          proposed rule.
 5/01/93  Obtain OAM/OGC comments.
 6/15/93  Present Federal Register notice to
          Administrative Council.
 7/01/93  Initiate Red Border review.
  9/1/93  Resolve Red Border comments.
 10/1/93  Publish proposed rule  in Federal
          Register.
 11/1/93  Receive public comments.
12/15/93  Initiate Red  Border review of final rule.
 2/15/94  Resolve Red Border comments.
  4/1/94  Publish final rule in  Federal Register.
 **(This effort subsumes staff recommendations  #48
    and 66 which are a  part of Standing Committee
    Recommendation  #38).

#55 -  The Contracts Management Manual  is  a
 procurement guidance document with  information of
 primary use to Agency  program offices and  program
 acquisition managers.  The Acquisition Handbook on
 the  other hand  is  a procurement guidance document
 with information of primary  use to  procurement
 personnel.  There  is very little if any  application
 to program  personnel.  Merging  these two documents
 does not therefore appear to be a viable solution
 to  issuing  clear and consistent guidance.

#56  - Establishing  a bulletin board  has  been
 adopted  as  a  mechanism for all  Agency procurement
 managers  to gain  access  to quick and practical
 procurement information  as well as  become updated
 on  policy issuances.   The establishment of a "Help
 Desk" is  also being  explored.

-------
Objective:
                                               June  30,  1993

                   COMMITTEE  REPORT  RECOMMENDATION  NO.  27

               Identify procurement  responsibilities  in
               recruiting materials  and  job announcements.
Report Reference:
Lead Office:
                   Pages 18-19,  paragraph 6.a
                   Staff Recommendation #5 - All vacancy
                   announcements should indicate the percentage
                   of contracts management work to be performed
                   and associated duties
                Office of Administration Resources Management
                (OHRM - Manager)
Supporting Offices:  None
Background:
Approach:
               The Standing Committee noted that a number of
               changes needed to be made to EPA's human resources
               policies to provide a greater emphasis on
               acquisition management.  This recommendation,
               which involves a series of steps over roughly an
               18 month time .frame is deemed to be fundamental to
               permanent change in EPA.  Inserting procurement
               responsibilities in job announcements and
               recruiting materials was one short term fix to a
               long standing problem.  It was felt that if
               candidates had a clear, and accurate reflection of
               the anticipated contract management duties and
               what percentage of their work would involve
               performing these duties before accepting the
               position, they would enter the job with realistic
               expectations of their roles and responsibilities.
               This should result in better contract management
               overall.

               OHRM will issue a Personnel Management Advisory on
               this matter, with review by the SCCM prior to
               issuance.  The Advisory will require that vacancy
               announcements indicate the percentage of contracts
               management involved in that particular position,
               as well as the types of contract management
               responsibilities.

               The following Staff Report recommendations will
               also be covered by addressing this  issue:

               #5 - All vacancy announcements should  indicate the
               percentage of contracts management  work  to be
               performed and associated duties.  (Page 79,
               paragraph  IV. 4. b>. >

-------
             #60  - The  QAT formed  to address Agency invoice
               issues  stated in recommendation  #39 is looking at
               developing guidance  on requisite elements of an
               invoice as well  as the accompanying contractor
               progress  report.


Validation:  Short-Term:
             -OAM will  verify  the  establishment  and use of a
             hotline  to facilitate agency contract managers in a
             timely fashion by 9/30/93.

             Long-Term:
             -OAM will  verify  the  issuance of  uniform,
             consistent, clear procurement guidance that  is
             disseminated throughout the Agency.  This  issuance
             is an ongoing effort  with verification being
             performed  by OAM.  This verification will  include
             validating that distribution throughout the  Agency
             has been completed, and by surveying SPOs' to
             determine  that the guidance is clear within  six
             months of  guidance issuance.  Another method to
             verify whether guidance  is clear  is to monitor the
             types and  frequency of guidance problems that are
              identified through the hotline.


StatusS    OAM  REVIEWING INFORMATION RECEIVED IN THE  INDEX FOR ANY
           INCONSISTENCIES.

-------
                                                June  30,  1993

                   COMMITTEE  REPORT  RECOMMENDATION NO.  28

Objective:   Emphasize  contract  management  in performance
            agreements.

Report References:  Pages 18-19,  paragraph 6.b.
                    Staff Recommendation:
                    #6  - Develop model   language  for  contracts;
                    management  performance  standards  for   all
                    employees    with    contracts     management
                    responsibilities
                    #7 - Disseminate language in #6
                    #8  - Provide  a  written evaluation  of  the
                    contract  administration  in  each  program  for
                    the performance  evaluation period
                    #9 - Review all  current position descriptions
                    and  FY  93 Performance  Standards  to  reflect
                    contracts management responsibilities
                    #50  - Develop  for Agency -review  performance
                    standards and job description  elements  that
                    accurately   describe   contracts   management
                    functions for  Contracting  Officer Technical
                    Representatives
                    #51  -   Provide   informal   oral  or  written
                    evaluation of contract administration in each
                    program at each performance evaluation period

Lead Office:  Office of Administration Resources Management
              (OHRM - Manager)

Supporting Offices:  None

Background:  The Standing Committee reported that EPA should
             emphasize contracts management in performance
             agreements  for all employees performing acquisition
             management responsibilities.   It was recommended that
             the model language include such items as  1. Timely
             planning of work assignments/delivery orders, 2.
             Thorough financial monitoring 3. Thorough  invoice
             reviews, and 4. Detailed evaluations of  contractor
             performance.  This recommendation was  intended to
             strengthen  the Agency's ability to hold
             individuals accountable for their performance in the
             area  of acquisition management.

Approach:   To use performance agreements and evaluations to give
            emphasis to  contract management responsibilities.

Milestones:  08/05/92    OHRM develops workplan reflecting 9/30
                          implementation date.   COMPLETED.

-------
Milestones:
validation:
08/05/92  OHRM will draft Personnel Management
          Memorandum.  COMPLETED.
09/01/92  Headquarters operations and regional
          operations begin to include appropriate
          statements in vacancy announcements.
          COMPLETED.  Memorandum including sample
          language sent to all offices.
          Requirement effective 9/30/92.
09/30/92  OHRM ensures all new brochures reflect
          potential for contract management
          responsibilities.  COMPLETED. Guidance
          issued.  Requirement effective 9/30/92.

Short-Term:
-OHRM will review a percentage of vacancy
announcements, and other recruitment materials to
verify that contract management duties have been
included and that the proper percentage of effort
required to perform these duties has been stated.
The validation effort will be completed by July
1993.  Review of these announcements will prove
whether any offices failed to accurately address
contract management duties.  In addition to this,
OHRM must review all "ncancy anno^r:	ents before
advertisement to the public.
Long-Term:
-The percentage of contracts management
responsibilities was adequately reflected in the
announcement and that a valid assessment of the
contract management duties to be undertaken was
made, would require evaluation after the positions
have been filled. This may take place one to two
years after the positions are filled.  It may
involve employee interviews. This analysis should
be performed by OHRM or someone outside the
particular office to assure unbiased, un-
compromised information.
Current status:
  A  PERSONNEL POLICY MEMORANDUM IS
  BEING DEVELOPED WHICH HILL REQUIRE THAT  LANGUAGE
  BE INSERTED IN ALL VACANCY ANNOUNCEMENTS
  IDENTIFYING THE EXTENT AND THE TYPE OF
  RESPONSIBILITIES FOR MANAGEMENT OF
  EXTRAMURAL RESOURCES THAT ARE REQUIRED TO
  PERFORM THE JOB. THIS LANGUAGE MUST BE INSERTED
  WHERE APPROPRIATE.  IT IS ANTICIPATED THAT THIS
  MEMORANDUM WILL BE ISSUED BY SEPTEMBER 1,  1993.
  AFTER ISSUANCE OF THIS MEMORANDUM A
  VALIDATION WILL BE PERFORMED.

-------
                                                  June  30,  1993
                   COMMITTEE REPORT RECOMMENDATION  NO.  29
Objective;
 Describe acquisition  management  responsibilities  in
 position descriptions.
Report Reference:

Lead Office:
        Pages 18-19,  paragraph  6.c
   Office of Administration Resources Management
   (OHRM - Manager)
Supporting Offices:  None
Background:
Approach:
   The  Standing Committee  reported that  EPA  should
  describe acquisition management responsibilities in
  position descriptions  thereby allowing individual
  contact managers  to have full knowledge of the r<^es,
  responsibilities, and  duties they are expected to
  fulfill.  Incorporating acquisition management into
  position descriptions  will help increase the level  of
  individual accountability and awareness.

OHRM will issue a Personnel Management  Advisory to
include acquisition management responsibilities in all
new or revised PDs.
Milestones:
 Validation:
     09/30/92  OHRM will issue  a  Personnel Management
              Memoranda   requiring    that   position
              descriptions  for   all   positions  with
              acquisition management responsibilities
              define  those  responsibilities.    This
              includes   new   and   existing  position
              descriptions. HRO's will also begin
              reviewing   checklists   that   must   be
              prepared by the acquiring office as well
              as   certify   their  accuracy.     These
              checklists must describe the amount and
              type  of  contract  management  to  be
              performed  or certify that  the position
              contains no contract management.
              COMPLETED.

   Long-Term:
   -OHRM will review a sample of position descriptions to
   verify that they contain language addressing the
   duties and responsibilities  in contract management.
   This review should  be completed by  June 1993.
   In  order  to verify  that position descriptions
   accurately reflect  the  extent  and type of contract
   management duties performed the position descriptions
   should be evaluated against work performed.  This may

-------
               09/15/92  OHRM develops standard CJE language for
                         performance agreements; language will be
                         distributed to Agency with the Fall
                         guidance on performance management.
                         COMPLETED.  Contracts management duties
                         were described using a functional
                         approach rather  than developing language
                         for specific positions.  The  language
                         allows managers  the ability to select the
                         standard most appropriate  for the  duties
                         of the employee.
             09/30/92    OHRM will  issue  a notice on contract
                         management in performance  evaluations
                         OHRM   meets  national   union  contract
                         requirements     for    impact    and
                         implementation bargaining.  COMPLETED.

Validation:    OHRM  should undertake a random sampling of
               performance agreements  to  verify that they  reflect
               contracts management responsibilities within each
               office  and  that  they incorporate appropriate
               language.  This  sampling  should be  completed by
               6/93.


current  Status:   A PERSONNEL POLICY MEMORANDUM IS
                  BEING DEVELOPED WHICH WILL REQUIRE THAT LANGUAGE
                  BE  INSERTED IN ALL PERFORMANCE  STANDARDS
                  IDENTIFYING THE EXTENT  AND THE  TYPE OF
                  RESPONSIBILITIES FOR MANAGEMENT OF
                  EXTRAMURAL RESOURCES THAT ARE REQUIRED TO
                  PERFORM THE JOB. THIS LANGUAGE  MUST BE INSERTED
                  WHERE APPROPRIATE.  IT  IS ANTICIPATED THAT THIS
                  MEMORANDUM WILL BE ISSUED BY SEPTEMBER 1, 1993.
                  AFTER ISSUANCE OF THIS  MEMORANDUM A
                  VALIDATION WILL BE PERFORMED.

-------
              be done by OHRM on a random  selection basis with at
              least 5% of position descriptions  evaluated
              within an office.  This  random  review should be
              completed by 9/30/93.

Current Status:  A PERSONNEL POLICY MEMORANDUM IS
                 BEING DEVELOPED WHICH WILL REQUIRE THAT LANGUAGE
                 BE INSERTED IN ALL POSITION  DESCRIPTIONS
                 IDENTIFYING THE EXTENT AND THE- TYPE OF
                 RESPONSIBILITIES  FOR  MANAGEMENT OF
                 EXTRAMURAL RESOURCES  THAT ARE REQUIRED TO
                 PERFORM THE JOB.  THIS LANGUAGE MUST BE INSERTED
                 WHERE APPROPRIATE.   IT IS ANTICIPATED THAT THIS
                 MEMORANDUM WILL BE ISSUED BY SEPTEMBER 1, 1993.
                 AFTER ISSUANCE OF THIS MEMORANDUM A
                 VALIDATION WILL BE PERFORMED.

-------
Objective:
                                   June 30, 1993

        COMMITTEE  REPORT  RECOMMENDATION NO. 30

Examine grade structure  and  award program to give
appropriate recognition  to contract management
responsibilities.
Report Reference:
Lead Office:
        Pages 18-19,  Paragraph 6.d
        Staff Recommendation:
        #17 - Evaluate the existing grade structure  for
        contract managers
        #62  -  Correct  disparities  between  the grade
        structure for contract managers and the grade
        structure for program personnel

   Office of Administration Resources Management
   (OHRM - Manager)
Support Office:  -Office of Acquisition Management
Background:
 Approacht
  The Standing Committee reported that EPA's human
  resources policies need to provide a greater emphasis
  on acquisition management.   The report addressed  the
  fact that there were d:.~^arities be«-wc-" the grade
  structure for contract. ...anagers ar   _..er program
  personnel.  The possibility of instituting rotations
  through placement and administration, regions and
  headquarters, and policy and training was also
  discussed. Career incentive in acquisition management
  needed improvement.  The committee recommended that
  to provide some career incentive for technical staff
  at pre-supervisory levels,  the Agency should give
  weight to the quality of contract management skills
  demonstrated by the employee, recognizing the
  planning, analysis, negotiation, oversight, tracking
  and evaluation abilities.  These abilities should be
  considered in crediting for managerial experience when
  an individual applies for a supervisory  or managerial
  position.

A four phased approach will be undertaken.  Phase one
will involve analyzing the current grade  structure.
This will be undertaken  by building a  list of
contracts mar^gers,  comparing grades and  performing
some calculations based  on those  comparisons.  Phase
two involves development of classification guidance.
This will be performed by collecting sample position
descriptions from Human  Resource  Officers (HRO) and
developing  evaluation benchmarks.   Phase  three  is to
develop  a plan  for  Human Resource Officers  to use the
guidance to align duties and  grades.   Phase four is
the implementation  and  follow up.

-------
           The evaluation of the Agency  awards program  will
           involve a separate approach.   An  exhaustive  analysis
           was performed on the EPA awards program  by a QAT.
           This analysis titled "An Inquiry  into  the
           Effectiveness of the EPA Awards Program, dated June
           1992 included a survey of approximately  1500 Agency
           employees.

           The QAT reached several conclusions that have
           applicability to contract management.  A  workgroup was
           developed to evaluate how best to award  good
           contract management as well as management  of all
           extramural resources.
Milestones:
  Grade Structure:
                          Collect EPA Personnel Payroll System
                          (EPAYS) data for target positions.
                          COMPLETED.
                          Gather sample position descriptions and
                          performance standards for target
                          positions.  COMPLETED.
                          Perform an?1ysis to develer
                          scope/parameters for the overall
                          review.  COMPLETED.
                          Develop an analytical plan and schedule
                          for a comprehensive review.  COMPLETED.
                          *lnitial meetings of the QATs.
                           COMPLETED.
                          Initial meeting of the taskforce.
                          COMPLETED.
                          Present plan and approach to the
                          Committee for approval.
                          Issue classification benchmarks.
                          Amend position descriptions and adjust
                          grades or duties.

*  Initially a. QAT was to be utilized.  This approach has now
been revised.  A task force will establish the plan with smaller
focus groups.taking on specific areas.
  08/21/92


  09/04/92


  09/18/92


  09/30/92

  04/30/93

6/1-6/2/93

  07/13/93

  08/31/93
  12/31/93
                Awards:
                10/92
                11/92
                 2/28/93
            Meeting held with OHRM and OAM to
            determine the best mechanism to award
            good contract management.  COMPLETED.

            Meetings held with OHRM and OAM to
            discuss expansion of the existing
            Contract Management Awards given
            annually to program personnel.
            COMPLETED.

            Workgroup formed to determine award
            structure, criteria for selection, and

-------
                3/17/93




                6/15/93





                6/15/93



                8/93



                11/93



                12/93


                1/94




                3/94


                On-Going
           making this award a part of  the
           Agencywide annual awards ceremony.
           COMPLETED.
           Presentation before SCCM on  awards
           proposal.   COMPLETED.   PROPOSED  PLAN  OF
           ACTION ADOPTED BY SCCM.

           OAM/OHRM issue informal guidelines
           describing types of awards available
           for contract management, criteria,  and
           nominating procedures.  COMPLETED.

           0AM issues Agency-wide call  letter  for
           Contract Management Awards.  COMPLETED.

           OHRM issues Agency-wide call letter for
           Honor Awards.

           0AM completes evaluation/selection
           process.

           Agency Awards ceremony

           OAM and OHRM issue new chapter to
           Awards Manual institutionalizing
           contract management awar. >.

           OAM issues handbook.

           SROs/OAM  Director recognize contract
           managers.
Validation:
Long-Term:
OHRM will validate that the 11 recommendations
included within the Awards Program review have
been implemented.  Validation of this
implementation should be accomplished by 12/30/93.
SPO's should provide information to OHRM relative
to performance in the area of contract management
and any changes noted  (whether positively or
negatively) since the change of the grade
structure and award system. Changes to be reported
by SPO's include: Turnover rates among contract
managers, Morale among contract managers, Number
of contract managers receiving awards. This
analysis should be performed by OHRM within two
years after these changes have been instituted on
a headquarters and regional level.
Current Status:
      CALL LETTERS AND INFORMAL GUIDANCE ISSUED.
      OAM ISSUED GUIDANCE DESCRIBING THE CONTRACT
      MANAGEMENT AWARDS.   OHRM ISSUED GUIDANCE
      PERTAINING TO THE OVERALL AGENCY CEREMONY.

-------
THE OHRM GUIDANCE STRESSED MANAGEMENT OF ALL
EXTRAMURAL RESOURCES  IN  ADDITION TO CONTRACT
MANAGEMENT.
OHRM CONVENED THE  INITIAL STEERING
COMMITTEE/WORK GROUP TO DEVELOP THE
PLAN AND APPROACH  FOR DEVELOPING
CAREER TRACK.  GROUP CONSISTED OF
HEADQUARTERS, REGIONAL AND LABORATORY
PARTICIPANTS.  MILESTONE SCHEDULE AND PLAN
WILL BE PRESENTED  TO THE COMMITTEE FOR
APPROVAL DURING  THE JULY 13, 1993 MEETING.

-------
Objective:
                                 June 30,  1993

       COMMITTEE REPORT RECOMMENDATION NO.  31

Develop a career track  for  contract  managers in much
the same way  that  the Agency has  for  scientists and
technical personnel
Report Reference:  Pages 18-19,  paragraph 6.e
Lead Office:
  Office of Administration Resources Management
  (OHRM - Manager)
Support Office:  Office of Acquisition Management
Background:
Approach:
 The Standing Committee found that a career track
 should be developed for contract managers in much the
 same  way that  the Agency  has  for scientists  and
 technical personnel.  Not having a career track for
 contract managers caused  a lack of career advancement
 for technical experts participating in acquisition
 management activities.  By developing a career track
 it was determined that in the long term, this approach
 would help alleviate the problem of scientists and
 engineers going into managerial careers by default,
 without  the motivation  and interest  '.n  management
 and administrative responsibilities such as contract
 management.

The Agency plans to develop a strategy to formulate a
career track for contract managers.  This effort
would first seek to identify the Knowledge, Skills,
and Abilities (KSA's) needed for each benchmark text
by each category of contract managers.  A description
of the various ways KSA's could be acquired would
then be pursued.  Examples are through training,
special projects, developmental assignments ,  etc.
Following these two steps OHRM would ask that  a plan
for acquiring KSA's and keeping them current be
developed for each contract manager.
Milestones:
  11/92

  12/92




  01/93
            5/30/93
         6/1-6/2/93
Convene Steering Committee/Work Group.
COMPLETED.
Develop parameters for initiative.  Plan to
be developed for GS-1102 personnel and for
other Agency contract managers.-COMPLETED.
MEMO DATED 12/10/92 REQUESTING DESIGNATED
STAFF TO WORK ON THIS INITIATIVE.
Convene QAT Project Leaders and begin data
gathering.  COMPLETED.  QAT HAS CONVENED AND
DATA GATHERING HAS BEGUN.

*lnitial QAT findings reported.
Initial meeting of task force.  Plan of action
to be finalized.'  Completed.

-------
           7/13/93   Present  plan  and  approach to the Committee
                     for  approval.

          10/31/93   Issue KSA package identifying KSAs  for each
                     benchmark text and describe ways any  KSA
                     could be acquired.

          12/31/93    Develop a plan for acquiring KSAs  and
                      keeping them current be developed  for each
                      contract manager.

*  Initially  a  QAT  was to be utilized.   This approach has now
been revised.   A  task force  will  establish the plan with  smaller
focus groups  taking on specific areas.
Validation:
Short-Term:
-OHRM will validate that an appropriate career track
has been developed. Information addressing the
career ladder and career path guidance should be
disseminated throughout the agency to all contract
managers.

Long-Term:
-Validation of  its success will take place after
individuals have •"•?--"3ted this prescribed career
track.  After completion of this presetj.oed track,
the initial "completers" should be interviewed by
OHRM and their  careers monitored.
Current  Status:
    OHRM CONVENED THE  INITIAL STEERING
    COMMITTEE/WORK GROUP TO DEVELOP THE
    PLAN AND APPROACH  FOR  DEVELOPING
    CAREER  TRACK.  GROUP CONSISTED OF HEADQUARTERS,
    REGIONAL AND LABORATORY PARTICIPANTS. MILESTONE
    SCHEDULE AND PLAN  WILL BE PRESENTED TO THE
    COMMITTEE  FOR APPROVAL DURING THE JULY
    13, 1993 MEETING.

-------
                                               June  30,  1993

                   COMMITTEE REPORT  RECOMMENDATION  NO.  32

Objective:  Evaluate EPA's disciplinary system to ensure tough,
            equitable,  and consistent treatment of  personnel who
            violate Agency rules and requirements.

Report Reference:  Pages 18-19,  paragraph 6.e
                   Staff  Recommendation   #58  -  Revise   EPA's
                   personnel regulations to specifically
                   make violation of personal  services  a serious
                   offense.

Lead Office:  Office of Administration Resources  Management
              (OHRM - Manager)

Background:  The Standing Committee reported that EPA's human
             resources needed to evaluate the current disciplinary
             system to ensure tough, equitable, and consistent
             treatment of personnel who violate Agency rules and
             requirements. It was determined that Agency managers
             must take a hard stand against contract management
             offenses such as Personal Services.  Not taking
             appropriate personnel Actions when problems occurred
             sent the same negative message as rewarding a
             manager for only doing part of his/her job
             correctly.

Approach:  Evaluate the current disciplinary system for any
           indications that the current policies are not tough,
           equitable, and consistent.  Any areas found to be
           lacking will r-s modified.

Milestones:  09/15/92    OHRM conducts benchmarking analysis of
                         disciplinary systems  in public and
                         private sectors.  COMPLETED.
             10/21/92    OHRM will discuss the proposed language
                         changes before the SCCM, highlighting
                         the pros and cons.   SCCM will render
                         comment on proposal  before amending the
                         disciplinary manual.  COMPLETED.   SCCM
                         ASKED  FOR ADDITIONAL INFORMATION.
             2/24/93     Revised presentation before SCCM
                         scheduled  for 2/24/93.  OHRM will  lead a
                         discussion of goals  and alternative
                         approaches to evaluate Agency
                         disciplinary system.  COMPLETED. ANOTHER
                         MEETING WAS SCHEDULED FOR 3/24/93.
             4/30/93     OHRM currently reviewing a  list of
                          issues identified during  3/24/93
                         meeting. COMPLETED.

-------
             6/30/93      Standing  Committee subcommittee
                          presented a  proposal  for handling
                          discipline for  SES employees. OHRM will
                          evaluate  the feasibility of application
                          of  this proposal  to non-SES employees.
                          COMPLETED.

             07/30/93     OHRM completes  and implements any needed
                          amendments to the disciplinary system.
Validation:
Short Term:
-Query employees and their managers that are
involved in contract management about their
awareness of the disciplinary rules regarding
contract mismanagement.  Based on responses
determine if further dissemination of information
is necessary.  This should commence six months
after the disciplinary system is altered.

Long Term:
 -After making revisions to the disciplinary system
  and or manual to incorporate and specify contract
  management duties anr^ responsibilities and the
  accompanying penalties, training on the
  disciplinary system has commenced, data should be
  gathered to determine are there more or less
  reported offenses than previous to the training
  or the revisions to the disciplinary system.
  Analysis will also be performed to determine if
  penalties are being administered in a consistent,
  and effective manner throughout the Agency. OHRM
  should gather this data and perform the analysis
  within six months to one year after the
  disciplinary system has been revised.
  -OHRM should also analyze current and past cases
  of offense in the area of contract management to
  determine changes in number and type.
Current Status:
   A SUBCOMMITTEE OF THE STANDING COMMITTEE HAS
   BEEN FORMED TO PERFORM A REVIEW OF THE AGENCY
   DISCIPLINARY RULES AND PROCEDURES FOR SES STAFF.
   THIS SUBCOMMITTEE PRESENTED ITS APPROACH FOR
   COMMENT AND ACCEPTANCE DURING THE JUNE 18,  1993
   STANDING COMMITTEE MEETING (NOW NAMED RESOURCE
   MANAGEMENT COMMITTEE) .  NOW THAT RMC HAS
   APPROVED THE APPROACH, MILESTONE SCHEDULE FOR
   GREEN BORDER REVIEW,  RESOLUTIONS OF COMMENTS,
   NEGOTIATIONS WITH UNIONS, AND INCORPORATION INTO
   THE AGENCY SYSTEM WILL BE ESTABLISHED.

-------
Objective:
                                     June 30, 1993

   COMMITTEE REPORT RECOMMENDATION NO.     33

 Use  independent governmental cost estimates
 (IGCEs)  to  analyze contractor costs.
Report Reference:
        Page  19,  Paragraph  7.a
        Staff Recommendation #2  -  Completion of
        cost  estimating  guides to  assist with
        development  of valid IGCEs
Lead Office:   Office  of Acquisition Management

Support Offices:   None
Background:
Approach:
  The Standing Committee Staff identified a number
  of steps that should be taken to ensure that EPA
  is aggressively pursuing every possible means of
  controlling contractor costs and performance.  A
  very important aspect of this is the development
  of independent government cost estimates (IGCEs)
  before the contractor begins work on an
  assignment.

Some offices have begun preparing IGCEs and are
refining the data bases and techniques.  EPA is
currently performing ICC^s prior to wcrV assignment
issuance on certain Superfund contracts (ARCS, TES)
and are endeavoring to spread this across all
Superfund contracts.

Total EPA use of IGCEs cannot be started until the
Cost Estimate guide is completed (Recommendation
#25).  A  draft of this guide will be completed by
4/1/93, and field tested.  When the final guidance
is issued, it will include a statement that IGCEs
are critical in determining cost reasonableness,
must be used, and procurement actions will not be
processed until an IGCE has been completed.

-------
Milestones:   02/09/93  First draft of guidelines issued by
                        0AM
              02/15/93  OAM issues interim guidance requiring
                        usage for all work assignments greater
                        than $25,000.
              03/26/93  Final draft IGCE guide developed by OAM
                        (Recommendation #25) issued
              03/26/93 - 06/15/93  Field testing of IGCE guide
                        by some program offices
              08/30/93  Incorporate comments and begin Green
                        Border Review
              11/30/93  Complete resolution of Green Border
                        comments
              01/31/93  Final guidance issued; program offices
                        will be expected to use it for all work
                        assignments, delivery orders, and new
                        contracts.

Validation:   The effectiveness of the use of IGCEs will be
              determined by: a) amount of actual use, and L;
              their usefulness in negotiations and cost
              control.

              OAM's Quality Assurance Staff, during its
              periodic Contract Administration Reviews of
              program offices' use of particular contracts,
              will verify that the IGCE guide is being used by
              PO's, WAN's, and/or DOPO's before issuing tasks
              (work assignments or delivery orders) to the
              contractor.  They will also ensure that the
              program office data bases are being updated with
              contract cost information and are being utilized
              in the development of IGCEs.  OAM will also
              survey program offices on how well the use of
              IGCEs assists them in a) negotiation of proposed
              costs for their tasks, and b) controlling costs
              once performance has begun.

Current  Status:   IGCEs are currently required for all
                  Superfund actions above $25,000.  Effective
                  with the interim guidance requirement issued
                  February 15, 1993, all programs are now
                  required to perform some type of IGCE for
                  actions above $25,000.  After the IGCE guide
                  is  issued early next year, contracting
                  officials will not process a procurement
                  action unless a copy of the IGCE is included
                  in  the procurement package.

-------
                                           June 30,  1993
                COMMITTEE REPORT RECOMMENDATION NO.
                                          34
Objective:
 Educate  contract  personnel  on  the use  of
 procurement  sanctions  including  suspension and
 debarment to enforce contracts.
Report Reference:
        Page  19,  Paragraph  7.b
        Staff Recommendation  #28  - Develop training
        for contracts  management  personnel on
        enforcing contract  performance,  including
        suspension and debarment.
Lead Office:   SES  Detailee
Support Offices:
       Grants Administration Division
       Office of Acquisition Management
Background:
Approach:
  The Standing Committee has recommended the
  permanent establishment of the most comprehensive
  training program in the history of EPA in orde^
  to change the embedded attitudes responsible for
  "cutting corners" in contract management.  The
  development of this training course in the use of
  procurement sanctions is one part of this overall
  effort.
The approach for this training will be cietermined
after the SES or GM-15 detailee conducts an
assessment of all existing contracts-related
training and develops a strategy for the overall
training initiative.  (See recommendation #17.)
Milestones:   02/17/93



              04/01/93



              06/01/93

              06/15/93


              09/30/93
            Overall strategy/workplan to
            restructure contracts management
            training program completed and
            presented to Standing Committee
            Preliminary assessment: of existing
            training programs in contracts
            management will be completed
            (COMPLETED)
            Identification of desired job
            performance will be completed
            Objectives for training program will be
            articulated.  Organizational support
            systems for training will be assessed
            Proposed curriculum and implementation
            schedule completed

-------
Validation:   Short-Term:
              -In order to determine the effectiveness of this
              training, all participants will be requested to
              evaluate the course after each training session.
              Part of that evaluation will include comments on
              whether additional coverage or other items should
              be included in the training.  The course will be
              modified as necessary.  In addition, if
              appropriate, tests or other measures will be used
              to determine whether students have achieved the
              desired skill or knowledge level.

              Long-Term:
              -Review GAD/CE records on an annual basis to
              determine how many employees received this
              training.  Survey employees through a
              questionnaire to assess whether, in the long
              term, they thought the training was valuable, and
              they had increased their knowledge  in the subject
              matter.

Current Status:  Work on  identifying desired job performance
                  and  impediments to good performance in
                  contracts management is ongoing; four focus
                  groups have been conducted; input from the
                  National Performance Review is  also being
                  used.

                  A survey of training needs has  been sent to
                  EPA  SESers to determine the focus of the next
                  round  of executive courses.

                  Work or  the revised core  curriculum course  on
                  resource management has been  completed;  the
                  course is  to be  delivered on  June  30.

                  Development of  courses for new  employees,  new
                  appointees, new members of the  SES  and new
                  managers is underway  also.

-------
                                                June 30, 1993

               COMMITTEE REPORT RECOMMENDATION NO.   35
Objective:
 Use contract types other than cost-reimbursement
 contracts where appropriate.
Report Reference:
        Page 19,  Paragraph 7c
        Staff Recommendation:
        #24 - Review and modify policy for
        determining whether an award fee contract
        is appropriate
        #33 - Complete guidance document on
        different contract types and their
        advantages and disadvantages
        #61 - Prepare comprehensive course for CO's
        on advantages and disadvantages of various
        types of contracts
        #68 - Training of CO's completed on the
        advantages and disadvantages of varic'.-s
        types of contracts
Lead Office:   Office of Acquisition  Management

Support Offices:   None
Background:
Approach:
  The Standing Committee recognizes •'--• "«»ed for
  understanding the difficulties associated with
  the use of cost-reimbursement contracts, the need
  to provide guidance for and to train staff on the
  use of different contract types.

Identify different contract types and different
methods for awarding contracts.
Milestones:   11/23/92
              12/01/92
              01/13/93
              01/28/93
            Presented status of work on alternative
            contract types to Standing Committee
            (COMPLETED)
            Completed review of Prequalified
            Offerers Procurement Strategy  (PQOPS)
            in Superfund for applicability to other
            program offices (COMPLETED)
            Workgroup on alternative contract
            mechanisms meet to discuss research
            findings
            Request opinion from OGC on CICA
            implications for multiple award of same
            statement of work, with competition of
            individual work assignments, and for
            combning different contract types.
            Response from OGC received 04/16/93.

-------
Milestones:   02/04/93-





              04/23/93

              07/07/93




              07/13/93





              08/01/93



              08/18/9?

              09/01/93



              10/01/93
Validation:
          04/20/93 WACA subgroup to identify
          major problem areas in current
          subcontracting, including cost-
          reimbursement contracts and their
          problems
          Present recommendation to Standing
          Committee (COMPLETED)
          Request for OGC opinion on
          protestability and requirement for de-
          briefing vendors after competition of a
          work assignment
          Present outline of requirements for
          hybrid contract type;  also addressing
          problems and concerns associated with
          selecting a pilot at Resource
          Management Committee Meeting
          Select acquisition candidates for use
          of hybrid contract and multiple award
          approaches
          Present recommendation for pilot to
          Resource Management Committee
          Draft solicitation provisions(s) and
          contract clauses for hybrid contracts
          and multiple awards
          Prepare guidance in Contracts
          Management Manual on usage
Short-Tenn:
-Incorporation of guidance in contract
administration training courses throughout the
Agency

Long-Term:
-Conduct: survey in April 1994 to establish
baseline for 1995 study on use of other contract
types
-Conduct study in April 1995 to determine whether
the Agency has expanded use of other contract
types, and evaluate,the effectiveness and cost-
savings incurred through -the use of other
contract types
Current Status:
    Milestones  revised.  Workgroup on Alternative
    Contract Approaches  is  still  looking  for an
    appropriate candidate.  Presentation  of
    outline of  hybrid contract type requirements
    and concerns and problems with selecting a
    pilot:  to Resource Mangement Committee on
    7/13/93.

-------
                                                  June  30,  1993


              COMMITTEE REPORT RECOMMENDATION NO.  36

Objective:     Develop policy on allowable and unallowable
               indirect costs.

Report Reference:   Page 19,  Paragraph 7.d
                    Staff Recommendation:
                    #18 - Draft policy with specific  definitions
                    of categories of both allowable and
                    unallowable indirect costs
                    #35 - Develop invoice certification by
                    contractors that documents the invoice  has
                    been reviewed and all costs determined
                    allowable

Lead Office:   Office of Acquisition Management

Support Offices:   None

Background:    The Standing Committee stated that EPA needs more
               aggressive methods to control indirect costs in
               terms of what is considered standard practice for
               the Government; and provide leadership where
               standard Government practices fail to adequately
               protect the public interest.

Approach: Two government-wide efforts are now underway to address
          the issue of indirect costs:

          1.  OMB established a twelve-agency SWAT Team to make
          recommendations on regulatory reforms needed to improve
          the process and better define indirect costs.  A final
          OMB report entitled "Summary Report of the SWAT Team on
          Civilian Agency Contracting" is due in the latter part
          of October or early November 1992.  The report will
          recommend significant changes to the FAR cost
          principles, most of which were recommended by EPA in
          its Agency SWAT team.  The initiative is important
          because it attempts to provide guidance for a single
          policy on interpretation and understanding of allowable
          indirect costs.

          OMB will take the cost principles  to the FAR council
          for implementation  in an expeditious manner  (immediate
          publication  in the  Federal Register  for comment), and
          will propose appropriate legislation to designate
          penalties for false certification  by contractors.

          EPA will track the  cost principles and  legislation  to
          ensure expeditious  implementation.   This will  include
          bi-weekly updates  from OMB when appropriate,

-------
          to determine  necessary action by EPA to accelerate
          execution.

          2.  The  Civilian Agency Acquisition Council  (CAAC) has
          proposed revisions  to the  Federal Acquisition
          Regulations  (FAR) to tighten the definition  of
          allowable indirect  costs and to bring civilian agencies
          into  line with the  stronger Department of  Defense
          regulati'ons governing indirect  costs.  This  action is
          currently underway  and should result in proposed FAR
          changes  in FY93.

          3.  In response to  the EPA SWAT team recommendations,
          OAM and  FMD conducted an evaluation of the complete
          voucher  process and determined  that because  FAR already
          spells out Agency recourse for  unallowable direct costs
          charges, this was not an area requiring additional
          certification; therefore,  contrary to staff
          recommendation #35, contractors will not be  required to
          certify1 that  all direct costs are allowable.
Milestones:
08/18/92  EPA SWAT team drafted memo on
          recommendations and forwarded to OMB for
          incorporation into OMB Government-wide
          draft
10/06/92  OMB issued Government-  "j Iraft,
          including EPA recommendations
10/08/92  Congressman Dingell's staff commends EPA
          on a job well done
10/16/92  OAM issued class deviation to EPAAR
          requiring that EPA contractors certify
          that vouchers include only costs which
          are allowable and allocable to contract
10/21/92  OAM updates SCCM on status of SWAT team
          initiatives
12/03/92  OMB issued its "Summary Report of the
          SWAT Team on Civilian Agency
          Contracting."  The report recommended
          significant changes to the FAR cost
          principles, most of which were
          recommended by EPA in its Agency Swat
          Team Report
02/17/93  OAM provides the Standing Committee
          on Contracts Management with a quarterly
          update
04/19/93  Quarterly update due
07/13/93  Quarterly update due
10/15/93  Quarterly update due
Validation:
Short-Term:
-Effective  immediately,  OAM will ensure  that
contracting offio*rs  have been  instructed  on

-------
               Voluntary Management Reductions  (VMR's) and  told
               that  they are  not an acceptable  substitute for
               identifying  and  excluding  unallowable costs.
               -By October  1, 1993, OAM's Quality Assurance Staff
               will  review  files in pre-award stage to ensure
               that  cost allowability  issues, reliability of
               contractor estimates, and  other  matters identified
               through audits and  negotiations  are documented  as
               being considered before contract award.
               -By October  1, 1993, establish an ICR progress
               reporting system to be  reviewed  by senior level
               procurement  officials.

               Long-Term:
               -By  FY 1994  auditors will  review files  to
               determine whether contractors have identified the
               records supporting  the  proposed  bases and pools
               submitted in final  indirect  cost rates  (ICR)
               proposals.
               -By  October  1, 1994 OAM will perform a  study to
               verify whether contractors have  been identifying
               all  cost-type Government prime contracts  and
               subcontracts affected by the final indirect  cost
               rate  when submitting the final ICR agreement.
               -January 1995 •  M-   TAR changes should be
               implemented  during  1993.  The first claim
               certifications will be  received  in 1994.   Audits
               which verify if  the changes  were effective will be
               conducted beginning in  1995.

Current Status:     OAM forwarded  four major recommendations
                    regarding employee health  and welfare to the
                    CAC for review on  March 30, 1993.  OMB  also
                    forwarded legislation regarding penalties on
                    unallowable costs  to Congress  for enactment.
                    OAM will give  an update on  the  status at
                    7/13/93 committee  meeting.

-------
                                              June  30, 1993

               COMMITTEE  REPORT RECOMMENDATION NO.    37

Objective:   Develop an integrated contract management
             information system that meets the needs of both
             EPA programs and the central acquisition
             functions, that is linked to EPA's integrated
             financial management system, and that is fully
             operational by FY 1995.

Report Reference:   Page 19, Paragraph 7.e

Lead Office:   Office of Information Resources Management

Support Offices:   Office of Acquisition Management
Background:
Approach:
  The Committee staff found that the Agency's
  national contracts management program is
  seriously lacking in effective and coordinated
  communications.  EPA does not adequately support
  the contracting structure/ processes and
  personnel with management information systems.
  Poor communication, and the resulting lack of
  consistent information about contracts,
  contractors, subcontractors, and contracting
  guidance is a major weakness in the Agency.

The I CMS team has determined necessoi.^ requirements
to satisfy the contracting community, as well as
Congress and OARM management.  EPA has reviewed
both commercial and other agency procurement
systems to determine their applicability to EPA.
Since none were found compatible with EPA's needs,
OIRH and OAM have begun developing an Agency
Integrated Contracts Management System.  This
process has been proceeding over the past three
years.  The current approach is to proceed with
development of appropriate designs, acquire
hardware/software platforms compatible with EPA
standards and construct, install, deploy, the
system and train the contracting/project officer
community.  The system will be phased  in gradually
over the next few years.  Core contract
requirements will comprise  the first phase.
Additional in-house resources have been  requested
to support the ICMS effort.  The specific timing
for implementation of the various phases will  be
determined as resource requirements are  met.
 Milestones:
   7/93    Definition of  Phase I.
   7/93    Hardware/Software procured for prototype
   12/93   Prototype completed.

-------
Validation:  A  Requirements Analysis has already been
             developed and validated by the  procurement
             community  (which  includes both  contracting
             personnel and program  offices).   As the system is
             "phased" in, the  ICMS  team  (OIRM,  OAM,
             and  NDPD) plan to continuously  keep the user
             community  fully engaged in the  review of  the ICMS
             effort.  This iterative process will  result in
             higher customer satisfaction  for ICMS as  it is
             phased in  over time in various  offices.  This
             will occur  periodically as  field testing  is
             implemented in various offices.


Current Status:   OPTIONS PRESENTED  TO  MANAGEMENT  FOR SHORT
                  TERM,  INTERIM SOLUTIONS ON MAY 17,  1993.
                  ICMS SCHEDULED TO  REPORT  BACK ON JULY 8  WITH
                  REVISED OPTIONS.   IT  IS THE GOAL TO DEVELOP A
                  WORKING PROTOTYPE  DURING  THE FIRST QUARTER OF
                  FY 94.

-------
                                             June 30, 1993

                 COMMITTEE REPORT RECOMMENDATION NO.  38

Objective:   Seek amendments to EPA Acquisition Regulations
              (EPAARs)  and the Federal Acquisition Regulation
              (FAR)  indirect cost rules.

Report Reference:   Page 19, Paragraph 7.f

                     Staff Recommendation:
                     #13 - OGC and CAM should draft  a contract
                     clause providing for penalty or payment of
                     interest on monies paid by EPA  on invoices
                     for unallowable costs
                     #40 - Place clause to incorporate policy
                     for recommendation #36 on allowable and
                     unallowable indirect costs in new contracts
                     and where possible,  in current  contracts.
                     Clause should contain a list of allowable
                     and unallowable morale costs
                     #67 - Amend the EPAAR to provide for
                     penalty or payment of interest  on monies
                     paid by EPA based on invoices  for costs not
                     allowable

 Lead Office:   Office of Ac^-i-1  . >n Management
Support Offices:     None

Background:     Certain costs which are technically allowable under
                the FAR were  questioned by GAO as being contrary to
                the taxpayer's  best interest.  However, contractors
                have used  the  "but  see  31.202-1  and  31.205-13"
                provision in the entertainment costs section of FAR
                (FAR 31.205-14) as an argument  to claim otherwise
                unallowable  entertainment   costs   as   allowable
                employee morale and welfare  costs.   FAR 31.205-14
                reads as follows:  "Costs of  amusement,  diversion,
                social  activities,   and  any  directly  associated
                costs such as  tickets to shows or  sports  events,
                meals,    lodging,   rental,   transport-*.t ion,   and
                gratuities are  unallowable (but see  31.205-1 and
                31.205.13).   FAR  31.205.13  pertains to  employee
                morale,   health,   welfare,   food   service,   and
                dormitory costs and  credits.   This  cost principle
                is  not  clear   on  whether  the cost  of  employee
                parties  is  allowable.    However,  case  law has
                established that employee parties are allowable  in
                some case.  Because of this, the standing committee
                has  recommended   that  the  Agency  narrow   the
                definition   of  employee  morale   costs   in   EPA
                contracts, in the EPAAR, and ultimately in FAR.

-------
              Further,  some  contractors  claim  costs  that  are
              clearly unallowable  under the FAR  costs principles
              and put the burden on government  auditors  to find
              them.   Under civilian  agency contracts, there is
              neither a requirement for the contractor to certify
              that the costs  are  allowable nor any  penalty for
              claiming unallowable  costs.   (DOD  has both  the
              certification and penalty authority)


Approach:  OMB assembled a SWAT team consisting of
           representatives from 12 Federal agencies  (including
           EPA) .  The purpose of the SWAT Teams included a
           requirement to determine if the government had  been
           accepting unallowable costs and to make
           recommendations for FAR reform  including  a review
           of the existing cost principles.  OMB accepted  most
           of EPA's recommendations.  Among the
           recommendations that were accepted by OMB, and
           which will be implemented on an expedited basis are
           changes to the following cost principles:

           1.    Employee Morale, Health, and Welfare;

           2.    Employee Compensation  (including bonuses);

           3.    Uncompensated overtime; and

           4.    Legislative  lobbying

           OMB also  accepted EPA's recommendations that
           contractors be  required to  certify their indirect
           cost  claims and that penalties be  imposed on
           contractors who claim  unallowable  costs.

           OMB expects to  issue its  "summary  Report of  the
           SWAT  Team on  Civilian  Agency Contracting" by early
           November.   As soon as  the report is  issued,  OMB
           plans the following:

            1.    The  above  cost principles will  be referred to
                 the  FAR  council for expedited processing by-
                 passing  much of the normal administrative
                 process.

            2.    Proposed legislation on the certification of
                 indirect cost claims and penalties will be
                 submitted to Congress for enactment.

            EPA will  track the.cost principles and legislation
            to ensure expeditious  implementation.   This will
            include bi-weekly updates from OMB when appropriate
            so that EPA can ascertain what necessary actions
            may be needed to accelerate execution.

-------
Milestones:   08/18/92
              10/21/93

              12/03/92
              02/17/93
              C4/16/93
              06/01/93
              07/13/93
              10/15/93
              01/15/94
              04/16/94
              06/01/94
          EPA SWAT team drafted memo on
          recommendations to 31.205-13(a),  (b)
          (morale costs) and 31.205-14
          (entertainment costs) to be
          incorporated into FAR; in accordance
          with staff recommendations 13 and 67,
          the EPA SWAT team also recommended that
          FAR be revised to implement penalties
          on both invoices containing unallowable
          costs and interest on monies paid by
          EPA based on invoices for costs that
          were later found to be unallowable
          SCCM members briefed on status of SWAT
          team recommendations
          OMB issues its "Summary Report of the
          SWAT Team on Civilian Agency
          Contracting" on December 3, 1992.
          Quarterly update to SCCM
          Quarterly update to SCCM
          SWAT Team proposals will be approved by
          CAAC and DAR councils, and will be
          published in the Federal Register
          Quarterly update to SCCM
          Quarterly update to SCCM
          Quarter j... ^jr^ate to SCCM
          Quarterly update to SCCM
          One-year commenting period complete;
          final rule incorporation into the
          Federal Acquisition Regulations
Validation:
Short-Term:
Immediately upon  implementation, regularly
scheduled audits  performed by EPA's auditors will
verify that the government is no longer being
billed for questionable  indirect costs.

Long-Tenn:
O1/01/95 - OAM will survey EPAAR users on utility
and effectiveness of  incorporating deviations in
EPAAR.
 current status:
    OFPP sent cost principle  issues to the FAR
    council  for  action  on  3/30/93.  OMB  also
    prepared proposed legislation on
    certification of indirect cost claims which
    was also sent to Congress for enactment.  OAM
    will update  Committee  members on  status at
    7/13/93  meeting.

-------
                                              June  30,  1993
                   COMMITTEE REPORT RECOMMENDATION NO.  39
Objective:
 Review approval  requirements of  NCPD
consistency with the Prompt Pay Act.
to determine
Report Reference:
        Staff Recommendation  #  25 - Review  approval
       requirements of NCPD to  determine  consistency
       with the Prompt Payment Act
Lead Office: Office of Administration Resources Management
             (NCPD - Manager)
Background:
Approach:
 Payment for most of the Agency's contract invoices are
 required  no  later  than 30  days  after receipt  in
 accordance with  the  Prompt  Payment  Act  and  OMB
 implementing  guidance.  Except for On-Scene
 Coordinators, Agency  Contracting  officers  have been
 delegated authority to approve contractor invoices to
 Project officers  (PO's)  and Delivery  Order Project
 Officers (DOPO's) .  The Agency previously allowed PC's
 and DOPO's 5 workdays to review  and approve/reject
 invoices.  This re^«w period  was.  increased  to  15
 calendar days in  FY 89.  However,  the major reason
 for late payments continues to be the late receipt
 of approvals. The Standing Committee recommended
 that the Agency determine adherence to the Prompt
 Pay Act.

 An NCPD team will be developed to examine approval
 time for FY ^1 and FY 92 to determine the degree of
 compliance with the current 15 day period by EPA
 region and major office location.  The team will
 then examine NCPD processing procedures for
 potential reductions  in processing time.  Based on
 the results of the above, a report will be prepared
 indicating findings and recommendations.
 This was done and the conclusions were that  in FY
 93, through  12/31/92, the Agency compliance  rate is
 98.6%.  Even though the Agency has such an admirable
 record, there are still roughly 15%  of all approving
 officials who do not  adhere to the internal  15
 calendar day approval time.   An  issue identified  is
 that Project Officers lack the information needed  to
 facilitate timely reviews.  A QAT was  formed to look
 at front-end invoice  processing problems and any
 other  areas  that hinder Project Officer approvals.
 Their  work products are anticipated  by 7/93.
 Milestones:   11/01/92

              12/01/92
             Complete review  of  compliance by
             approving officials.  • COMPLETED.
             Complete examination  of  NCPD processing
             procedures.  COMPLETED.

-------
             12/31/92     Report on findings and  recommendations
                          and establish schedule  for instituting
                          any recommended changes to Prompt Pay
                          procedures.   COMPLETED.

             3/93         QAT formed to evaluate  front-end invoice
                          processing problems and any other areas
                          that hinder Project Officer approvals.
                          COMPLETED.  INITIAL FOCUS GROUP MEETINGS
                          SCHEDULED FOR 4/26/93.   COMPLETED.

             7/93         Final analysis expected from QAT
Validation:   Long-Term:
              -NCPD will verify adherence to Prompt Payment Act
               through month to date and fiscal year to date
               evaluations on the Agency's prompt payment record
              -Comparisons of FY 91 and FY 92 late payments will
               be made
              -An analysis of the differences will be performed
              -If warranted, changes to the prompt payment
               guidance may be instituted and disseminated
               throughout the Agency v-' December 30, "993.

Current Status:    QAT REPORTED OUT ON THE RESULTS OF THE FOCUS
                   GROUPS.  FLOW CHARTING TO BEGIN JULY 1993.
                   RECOMMENDED SOLUTIONS TO BE PRESENTED TO THE
                   COMMITTEE DURING THE AUGUST MEETING.

-------
Objective:
                                 June 30, 1993

  COMMITTEE REPORT RECOMMENDATION NO.     40

 Complete plan for addressing the  material
 nonconformance of reconciling the Personal
 Property Accountability System with the Integrated
 Financial Management System
Report Reference:


Lead Office:   Office of Administration
        Page 112  of Staff Report,  Recommendation
        #42
Support Offices:
       Office of Information Resources Management
       Office of the Comptroller
Background:
Approach?
  The Standing Committee Staff Report noted that,
  since 1983,  the Agency has listed in its letter
  to the President on EPA's compliance with the
  Federal Managers' Financial Integrity Act, the
  need for reconciliation between the Personal
  Property Accountability System and the Integrated
  Financial Management System, as a "material
  nonconformance".  The Staff Report recommended
  that a plan be developed for addressing this.

A Task Force,  made up cf representativer from the
Office of Administration (Facilities Management and
services Division), Office of the Comptroller
(Financial Management Division), and Office of
Information Resources Management (Administrative
Services Division), has been formed to put together
a plan for addressing this issue and ensuring that
the reconciliation takes place.  Over the next
several months, the plan will be  finalized.
Further efforts in fiscal years 1993 and 1994 will
be devoted towards the actual implementation of the
plan.

-------
Milestones:
09/28/92  FMSD, FMD, and OIRM Division Directors
          meet to define the roles of each office
          and the scope of the project; staff
          designated to develop plan and
          coordinate efforts (COMPLETED)
10/31/92  Management level working group meet to
          plan development of conceptual
          framework and key policy and procedural
          elements of reconciliation process
          (COMPLETED)
11/30/92  Technical-level working group meet to
          evaluate present PPAS/IFMS system
          capabilities, software limitations, and
          common data elements. COMPLETED
02/06/93  QAT formed to develop options analysis
          and implementation strategy for
          reconciliation. COMPLETED.
10/31/93  Options paper and recommendation
          presented to management.
11/31/93  Management obtains approval from Agency
          CFO
03/31/94  Detailed implementation strategy
          presented to management
08/30/94-
02/28/95  Test property system
02/28/95  Implementation of property system  (date
          tentative based on final option
          selected and funds availability).
validation;
The QAT wil \ present two  deliverables to
management.  The  first will be an options paper.
This paper  will describe  in detail each option
for solving the problem.   In addition to the
options, the grooup will  recommend one option for
implementation.   The. sacon deliverable will be an
implementation strategy.   This deliverable will
provide management with the necessary steps to
implement the selected option.  Once the selected
option has  been implemented field testing will
determine whether these needs have been met and
the user community is satisfied.  An audit could
also be performed to verify that IFMS has
accurate and complete data on personal property.
This effort should be performed by an  independent
party within one  year after full implementation
is completed.

-------
Current Status:   MILESTONES REVISED.   THE QAT HAS ACCOMPLISHED
                  THE FOLLOWING TO  DATE:   ESTABLISHED ITS GOALS
                  AND MISSION STATEMENT,  IDENTIFIED WEAKNESSES
                  WITH THE CURRENT  SYSTEM, IDENTIFIED THREE
                  OPTIONS FOR SOLVING THE WEAKNESSES, AND MET
                  WITH THE UNITED STATES GEOLOGICAL SURVEY,
                  WHICH IS CURRENTLY DEVELOPING AN INTEGRATED
                  PROPERTY SYSTEM,  TO DISCUSS THEIR APPROACH.

-------