DOCKET REPORT SUPPORTING DOCUMENTS FOR THE REGULATORY ANALYSIS OF THE PART 264 LAND DISPOSAL REGULATIONS Volume III August 24, 1982 U.S. Environmental Protection Agency 401 M Street, S.W. Washington, D.C. 20460 ------- DOCKET REPORT SUPPORTING DOCUMENTS FOR THE REGULATORY ANALYSIS OF THE PART 264 LAND DISPOSAL REGULATIONS TABLE OF CONTENTS Volume I Chapter I — Introduction Chapter II — Profile of Land Disposal Units and Facilities Costed in the Analysis Chapter III — Assumptions/Costs Included in the Baseline Chapter IV — Summary of Part 264 Regulatory Requirements Chapter V — Ground-Water Protection and Corrective Action Costs Chapter VI — Assumptions and Methodology Used to Calculate Annual Revenue Requirements Chapter VII — Results of Cost Analysis Chapter VIII — Impacts of the Regulations on Selected Industries Volume II Appendix A — Regulatory Analysis (Section IX. of the Preamble to the Part 264 Regulations) Appendix B — Unit Costs Used to Develop Baselines Appendix C — Part 264 Engineering Costs for Landfills, Surface Impoundments, Waste Piles, and Land Treatment areas Appendix D — Cost Estimates for Containment of Contaminated Ground-Water Plumes Volume III Appendix E — Printouts of Annual Revenue Requirements and First Year Cash Requirements for Landfills, Surface Impoundments, Waste Piles, and Land Treatment areas by Size. ------- 269S9 APPENDIX E ------- APPENDIX E ANNUAL REVENUE REQUIREMENTS AND FIRST YEAR CASH REQUIREMENTS This appendix contains printouts of the annual revenue requirements and first year cash requirements estimated for landfills, surface Impoundments, land treatment areas, and waste piles. Total annual revenue and first year cash requirements for all size categories for each land disposal process are broken down In the printouts Into the following cost components: o Basic compliance cost; an estimate of the basic D&O costs for the ISS baseline and the incremental Part 264 requirements. o Counterpumping using Strategy 1; an estimate of the incremental costs of corrective action under Strategy 1 conditions. Strategy 1 assumes simple ground-water flow conditions. Estimates are provided for: - corrective action starting in year 0 and continuing for 20 years. - corrective action starting in year 49 and continuing for 20 years. - corrective action starting in year 0 and continuing for 150 years (approximately equivalent to counterpumping indefinitely). o Counterpumping using Strategy 2; an estimate of the incremental costs of corrective action under Strategy 2 conditions. Strategy 2 assumes complex ground-water flow conditions. Estimates are provided for: - corrective action starting in year 0 and continuing for 20 years. - corrective action starting in year 49 and continuing for 20 years. - corrective action starting in year 0 and continuing for 150 years. (approximately equivalent to Counterpumping indefinitely). o Post Closure Costs; an estimate of the Incremental costs of post closure requirements under ISS. It is listed separately to show how big these costs are in relation to ISS D&O. Incremental Part 264 post closure costs occur only in those cases where an existing surface impoundment is closed to construct a new one in compliance with Part 264. There are no incremental Part 264 post closure costs for landfills, land treatment areas, waste piles, or for other surface impoundment compliance scenar- ios. o Financial Assurance Costs for Closure; an estimate of what it costs firms to guarantee that they will have sufficient funds available to close their facilities according to the requirements specified in the regulations. The mix of financial instruments used to estimate these costs was: 50% financial test, 14% letter of credit, 18% trust fund, and 18% insurance. These costs are listed separately in the printouts to show how big they are in relation to ISS and Incremental Part 264 D&O costs. ------- E-2 o Financial Assurance Costs for Post Closure; an estimate of i*iat it costs firms to guarantee that they will have sufficient funds available to cover all capital and annual O&M costs expected to be incurred during the 30 year post closure period. Post closure cost components are listed in Appendix B and summarized in Chapter 111. The mix of financial instruments used to estimate total post closure financial assurance costs was: 50% financial test, 14% letter of credit, 18% trust fund, and 18% insurance. These costs are listed separately in the printouts to show how big they are in relation to ISS and incremental Part 264 O&O costs. o Total Costs; total of all cost components, assuming either Strategy 1 or Strategy 2 counterpumping. The remainder of this appendix consists of the printouts of cost estimates for each type of process. The printouts are organized as follows: Landfill Printouts I. Annual Revenue Requirements A. Single synthetic liner for Part 264 D&O for all landfills. 1. offsite landfills by size category 2. onsite landfills by size category B. Double liner (synthetic/clay) for Part 264 D&O for all landfills. 1. offsite landfills by size category 2. onsite landfills by size category C. Double synthetic liner for Part 264 D&O for all landfills (exempt from ground-water monitoring). 1. offsite landfills by size category 2. onsite landfills by size category II. First Year Cash Requirements A. Single synthetic liner for Part 264 D&O for all landfills. 1. offsite landfills by size category 2. onsite landfills by size category B. Double liner (synthetic/clay) for Part 264 D&O for all landfills. 1. offsite landfills by size category 2. onsite landfills by size category C. Double synthetic liner for Part 264 D&O for all landfills (exempt from ground-water monitoring). 1. offsite landfills by size category 2. onsite landfills by size category ------- E-3 Surface Impoundment Printouts I. Annual Revenue Requirements A. Single synthetic liner for Fart 264 D&O for all surface impound- ment sizes. B. Double liner (synthetic/clay) for Part 264 D&O for all surface Impoundment sizes. C. Double synthetic liner for Part 264 D&O for all surface impound- ment sizes (exempt from ground-Hater monitoring). II. First Year Cash Requirements A. Single synthetic liner for Part 264 D&O for all surface impound- ment sizes. B. Double liner (synthetic/clay) for Part 264 D&O for all surface impoundment sizes. C. Double synthetic liner for Part 264 D&O for all surface impound- ment sizes (exempt from ground-water monitoring). Land Treatment Printouts I. Annual Revenue Requirements for all area sizes. II. First Year Cash Requirements for all area sizes. Waste Pile Printouts I. Annual Revenue Requirements A. Sturdy Impermeable Base + Annual Inspection for Part 264 D&O for all waste pile sizes (exempt from ground-water monitoring). B. Sturdy Impermeable Base •+• Ground-Water Monitoring for Part 264 D&O for all waste pile impoundment sizes. C. Double liner/Leachate Collection System for Part 264 D&O for all waste pile sizes (exempt from groundwater monitoring). II. First Year Cash Requirements A. Sturdy Impermeable Base + Annual Inspection for Part 264 D&O for all waste pile sizes (exempt from ground-water monitoring). B. Sturdy Impermeable Base + Ground-Water Monitoring for Part 264 D&O for all waste pile Impoundment sizes. C. Double liner/Leachate Collection System for Part 264 D&O for all waste pile sizes (exempt from ground water monitoring). ------- LANDFILL PRINTOUTS I. Annual Revenue Requirements A. Single Synthetic Liner for Part 264 D&O 1. Offsite Landfills 2. Onsite Landfills ------- Facility Type: Offslte Landfill Size: 500 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 159 0 0 7 0 9 175 175 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 32 0 0 0 0 0 32 32 32 75 105 0 0 0 107 137 Starts In Yr 49 Continues for 20 Yrs 32 19 26 0 0 0 51 58 Starts In Yr 0 Continues for 150 Yrs 32 160 220 0 0 0 252 ------- Facility Type: Offsice Landfill Size: 2,000 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 195 0 0 8 0 10 213 213 No Corrective Action Necessary 50 0 0 0 0 0 50 50 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 50 81 119 0 0 0 131 169 Starts In Yr 49 Continues for 20 Yrs 50 20 29 0 0 0 70 79 Starts In Yr 0 Continues for 150 Yrs 50 171 247 0 0 0 221 297 ------- Facility Type: Offsite Landfill Size: 5,000 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264.Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 248 0 0 9 0 11 268 268 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 81 0 0 0 0 0 81 81 81 92 138 0 0 0 173 219 Starts In Yr 49 Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 81 23 33 0 0 0 104 114 81 194 289 0 0 0 275 370 ------- Facility Type: Offsite Landfill Size: 7,000 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 281 0 0 10 0 12 303 303 No Corrective Action Necessary 100 0 0 0 0 0 100 100 Starts in Yr 0 Continues for 20 Yrs 100 95 142 0 0 0 195 242 Corrective Action Necessary Starts In Yr 49 Starts Continues for 20 Yrs Continues 100 23 34 0 0 0 123 134 In Yr 0 for 150 Yrs 100 200 297 0 0 0 300 397 ------- Facility Type: Offsite Landfill Size: 15,000 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) 1SS Baseline 396 0 0 12 0 15 423 423 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 151 0 0 0 0 0 151 151 151 103 158 0 0 0 254 309 Starts In Yr 49 Continues for 20 Yrs 151 26 38 0 0 0 177 189 Starts In Yr 0 Continues for 150 Yrs 151 216 330 0 0 0 367 481 ------- Facility Type: Offsite Landfill Size: 35,000 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations Basic Compliance Cost Counter pumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 732 0 0 18 0 21 771 771 No Corrective Action Necessary 279 0 0 0 0 0 279 279 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 279 114 184 0 0 0 393 463 Starts In Yr 49 Continues for 20 Yrs 279 28 44 0 0 0 307 323 Starts In Yr 0 Continues for 150 Yrs 279 238 383 0 0 0 517 662 ------- Facility Type: Offsite Landfill Size: 60,000 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264.Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1069 0 0 23 0 27 1119 1119 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 382 0 0 0 0 0 382 382 382 123 200 0 0 0 505 582 Starts In Yr 49 Continues for 20 Yrs 382 30 48 0 0 0 412 430 Starts In Yr 0 Continues for 150 Yrs 382 254 413 0 0 0 636 795 ------- Facility Type: Offsite Landfill Size: 123,000 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264iRegulations Basic Compliance Cost Counterpumping Cost Using; Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1815 0 0 31 0 37 1883 1883 No Corrective Action Necessary 565 0 0 0 0 0 565 565 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 565 133 216 0 0 0 698 781 Starts In Yr 49 Continues for 20 Yrs 565 32 52 0 0 0 597 617 Starts In Yr 0 Continues for 150 Yrs 565 274 444 0 0 0 839 1009 ------- Facility Type: Onslte Landfill Size: 500 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 168 0 0 7 0 9 184 184 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 31 0 0 0 0 0 31 31 31 65 95 0 0 0 96 126 Starts In Yr 49 Continues for 20 Yrs 31 17 24 0 0 0 48 55 Starts In Yr 0 Continues for 150 Yrs 31 138 198 0 0 0 169 229 ------- Facility Type: Onslte Landfill Size: 2,000 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counter pumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) 1SS Baseline 211 0 0 8 0 10 229 229 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 49 0 0 0 0 0 49 49 49 71 109 0 0 0 120 158 Starts In Yr 49 Continues for 20 Yrs 49 18 27 0 0 0 67 76 Starts In Yr 0 Continues for 150 Yrs 49 149 225 0 0 0 198 274 ------- Facility Type: Oneite Landfill Size: 5,000 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 278 0 0 9 0 11 298 298 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 79 0 0 0 0 0 79 79 79 82 128 0 0 0 161 207 Starts In Yr 49 Continues for 20 Yrs 79 21 31 0 0 0 100 110 Starts In Yr 0 Continues for 150 Yrs 79 172 267 0 0 0 251 346 ------- Facility Type: Onsite Landfill Size: 7,000 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 320 0 0 10 0 12 342 342 No Corrective Action Necessary 98 0 0 0 0 0 98 98 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 98 85 132 0 0 0 183 230 Starts In Yr 49 Continues for 20 Yrs 98 21 32 0 0 0 119 130 Starts In Yr 0 Continues for 150 Yrs 98 178 275 0 0 0 276 373 ------- Facility Type: Onslte Landfill Size: 15,000 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 460 0 0 12 0 15 487 487 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 149 0 0 0 0 0 149 149 149 93 148 0 0 0 242 297 Starts In Yr 49 Continues for 20 Yrs 149 24 36 0 0 0 173 185 Starts In Yr 0 Continues for 150 Yrs 149 194 308 0 0 0 343 457 ------- Facility Type: Onsite Landfill Size: 35,000 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 i Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 859 0 0 18 0 21 898 898 No Corrective Action Necessary 277 0 0 0 0 0 277 277 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 277 104 174 0 0 0 381 451 Starts In Yr 49 Continues for 20 Yrs 277 26 42 0 0 0 303 319 Starts In Yr 0 Continues for 150 Yrs 277 216 361 0 0 0 493 638 ------- Facility Type: Onsite Landfill Size: 60,000 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Count erpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1247 0 0 23 0 27 1297 1297 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 379 0 0 0 0 0 379 379 379 113 190 0 0 0 492 569 Starts In Yr 49 Continues for 20 Yrs 379 28 46 0 0 0 407 425 Starts In Yr 0 Continues for 150 Yrs 379 232 391 0 0 0 611 770 ------- Facility Type: Onslte Landfill Size: 123,000 Metric Tons/Year Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using; Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 2081 0 0 31 0 37 2149 2149 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 566 0 0 0 0 0 566 566 566 123 206 0 0 0 689 772 Starts In Yr 49 Continues for 20 Yrs 566 30 50 0 0 0 596 616 Starts In Yr 0 Continues for 150 Yrs 566 252 422 0 0 0 818 988 ------- LANDFILL PRINTOUTS I. Annual Revenue Requirements B. Double Liner (Synthetic/Clay) for Part 264 D&O 1. Offsite Landfills 12. Onsite Landfills ------- Facility Type: Offsite Landfill Size: 500 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 159 0 0 7 0 9 175 175 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 44 0 0 0 0 0 44 44 44 75 105 0 0 0 119 149 Starts In Yr 49 Continues for 20 Yrs 44 19 26 0 0 0 63 70 Starts In Yr 0 Continues for 150 Yrs 44 160 220 0 0 0 204 264 ------- Facility Type: Offsite Landfill Size: 2,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 195 0 0 8 0 10 213 213 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 74 0 0 0 0 0 74 74 74 81 119 0 0 0 155 193 Starts In Yr 49 Continues for 20 Yrs 74 20 29 0 0 0 94 103 Starts In Yr 0 Continues for 150 Yrs 74 171 247 0 0 0 245 321 ------- Facility Type: Offsite Landfill Size: 5,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 248 0 0 9 0 11 268 268 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 124 0 0 0 0 0 124 124 124 92 138 0 0 0 216 262 Starts In Yr 49 Continues for 20 Yrs 124 23 33 0 0 0 147 157 Starts In Yr 0 Continues for 150 Yrs 124 194 289 0 0 0 318 413 ------- Facility Type: Offsite Landfill Size: 7,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using; Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 281 0 0 10 0 12 303 303 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 155 0 0 0 0 0 155 155 155 95 142 0 0 0 250 297 Starts In Yr 49 Continues for 20 Yrs 155 23 34 0 0 0 178 189 Starts In Yr 0 Continues for 150 Yrs 155 200 297 0 0 0 355 452 ------- Facility Type: Offsite Landfill Size: 15,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 396 0 0 12 0 15 423 423 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 239 0 0 0 0 0 239 239 239 103 158 0 0 0 342 397 Starts In Yr 49 Continues for 20 Yrs 239 26 38 0 0 0 265 277 Starts In Yr 0 Continues for 150 Yrs 239 216 330 0 0 0 455 569 ------- Facility Type: Offsite Landfill Size: 35,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264[Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 732 0 0 18 0 21 771 771 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 451 0 0 0 0 0 451 451 451 114 184 0 0 0 565 635 Starts In Yr 49 Continues for 20 Yrs 451 28 44 0 0 0 479 495 Starts In Yr 0 Continues for 150 Yrs 451 238 383 0 0 0 689 834 ------- Facility Type: Offsite Landfill Size: 60,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1069 0 0 23 0 27 1119 1119 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 624 0 0 0 0 0 624 624 624 123 200 0 0 0 747 824 Starts In Yr 49 Continues for 20 Yrs 624 30 48 0 0 0 654 672 Starts In Yr 0 Continues for 150 Yrs 624 254 413 0 0 0 878 1037 ------- Facility Type: Offsite Landfill Size: 123,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) 1. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1815 0 0 31 0 37 1883 1883 No Corrective Action Necessary 933 0 0 0 0 0 933 933 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 933 133 216 0 0 0 1066 1149 Starts In Yr 49 Continues for 20 Yrs 933 32 52 0 0 0 965 985 Starts In Yr 0 Continues for 150 Yrs 933 274 444 0 0 0 1207 1377 ------- Facility Type: Onsite Landfill Size: 500 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 'Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 168 0 0 7 0 9 184 184 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 52 0 0 0 0 0 52 52 52 65 95 0 0 0 117 147 Starts In Yr 49 Continues for 20 Yrs 52 17 24 0 0 0 69 76 Starts In Yr 0 Continues for 150 Yrs 52 138 198 0 0 0 190 250 ------- Facility Type: Onsite Landfill Size: 2,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) 1SS Baseline 211 0 0 8 0 10 229 229 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 94 0 0 0 0 0 94 94 94 71 109 0 0 0 165 203 Starts In Yr 49 Continues for 20 Yrs 94 18 27 0 0 0 112 121 Starts In Yr 0 Continues for 150 Yrs 94 149 225 0 0 0 243 319 ------- Facility Type: Onslte Landfill Size: 5,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 278 0 0 9 0 11 298 298 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 164 0 0 0 0 0 164 164 164 82 128 0 0 0 246 292 Starts In Yr 49 Continues for 20 Yrs 164 21 31 0 0 0 185 195 Starts In Yr 0 Continues for 150 Yrs 164 172 267 0 0 0 336 431 ------- Facility Type: Onsite Landfill Size: 7,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costa of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 320 0 0 10 0 12 342 342 No Corrective Action Necessary 207 0 0 0 0 0 207 207 Starts in Yr 0 Continues for 20 Yrs 207 85 132 0 0 0 292 339 Corrective Action Necessary Starts In Yr 49 Starts Continues for 20 Yrs Continues 207 21 32 0 0 0 228 239 In Yr 0 for 150 Yrs 207 178 275 0 0 0 385 482 ------- Facility Type: OnsIte Landfill Size: 15,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) 1SS Baseline 460 0 0 12 0 15 487 487 No Corrective Action Necessary 323 0 0 0 0 0 323 323 Corrective Action Necessary Starts In Yr 0 Continues for 20 Yrs 323 93 148 0 0 0 416 471 Starts In Yr 49 Continues for 20 Yrs 323 24 36 0 0 0 347 359 Starts In Yr 0 Continues for 150 Yrs 323 194 308 0 0 0 517 631 ------- Facility Type: Onslte Landfill Size: 35,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using; Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 859 0 0 18 0 21 898 898 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 622 0 0 0 0 0 622 622 622 104 174 0 0 0 726 796 Starts In Yr 49 Continues for 20 Yrs 622 26 42 0 0 0 648 664 Starts In Yr 0 Continues for 150 Yrs 622 216 361 0 0 0 838 983 ------- Facility Type: Onsite Landfill Size: 60,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264•Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1247 0 0 23 0 27 1297 1297 No Corrective Action Necessary 862 0 0 0 0 0 862 862 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 862 113 190 0 0 0 975 1152 Starts In Yr 49 Continues for 20 Yrs 862 28 46 0 0 0 890 908 Starts In Yr 0 Continues for 150 Yrs 862 232 391 0 0 0 1094 1253 ------- Facility Type: Onslte Landfill Size: 123,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 2081 0 0 31 0 37 2149 2149 No Corrective Action Necessary 1306 0 0 0 0 0 1306 1306 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 1306 123 206 0 0 0 1429 1512 Starts In Yr Continues for 1306 30 50 0 0 0 1336 1356 49 > Starts In Yr 0 20 Yrs Continues for 150 Yrs 1306 252 422 0 0 0 1558 1728 ------- LANDFILL PRINTOUTS I. Annual Revenue Requirements C. Double Synthetic Liner for Part 264 D&O 1. Offsite Landfills 2. Onsite Landfills ------- Facility Type: Offelte Landfill Size: 500 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements <$ 000) Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ZSS Baseline 159 0 0 7 0 9 175 175 No Corrective Action Necessary 45 0 0 0 0 0 45 45 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 45 80 110 0 0 0 125 155 Starts In Yr 49 Continues for 20 Yrs 45 19 26 0 0 0 64 71 Starts In Yr 0 Continues for 150 Yrs 45 167 227 0 0 0 212 272 ------- Facility Type: Offsite Landfill Size: 2,000 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements (§ 000) Incremental Costs of Complying with Part 26A.Regulations Basic Compliance Cost Count erpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 195 0 0 8 0 10 213 213 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 83 0 0 0 0 0 83 83 83 86 124 0 0 0 169 207 Starts In Yr 49 Continues for 20 Yrs 83 20 29 0 0 0 103 112 Starts In Yr 0 Continues for 150 Yrs 83 178 254 0 0 0 261 337 ------- Facility Type: Offsite Landfill Size: 5,000 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) 1SS Baseline 248 0 0 9 0 11 268 268 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 146 0 0 0 0 0 146 146 146 97 143 0 0 0 243 289 Starts In Yr 49 Continues for 20 Yrs 146 23 33 0 0 0 169 179 Starts In Yr 0 Continues for 150 Yrs 146 201 296 0 0 0 347 442 ------- Facility Type: Offsite Landfill Size: 7,000 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 281 0 0 10 0 12 303 303 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 186 0 0 0 0 0 186 186 186 100 147 0 0 0 286 333 Starts In Yr 49 Continues for 20 Yrs 186 23 34 0 0 0 209 220 Starts In Yr 0 Continues for 150 Yrs 186 207 304 0 0 0 393 490 ------- Facility Type: Offsite Landfill Size: 15,000 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Coats of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 396 0 0 12 0 15 423 423 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 292 0 0 0 0 0 292 292 292 108 163 0 0 0 400 455 Starts In Yr 49 Continues for 20 Yrs 292 26 38 0 0 0 318 331 Starts In Yr 0 Continues for 150 Yrs 292 223 337 0 0 0 515 629 ------- Facility Type: Offsite Landfill Size: 35,000 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264.Regulations Basic Compliance Cost Counterpumplng Cost Using; Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 732 0 0 18 0 21 771 771 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 563 0 0 0 0 0 563 563 563 119 189 0 0 0 682 752 Starts In Yr 49 Continues for 20 Yrs 563 28 44 0 0 0 591 607 Starts In Yr 0 Continues for 150 Yrs 563 245 390 0 0 0 808 953 ------- Facility Type: Offsite Landfill Size: 60,000 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Coats of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1069 0 0 23 0 27 1119 1119 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 782 0 0 0 0 0 782 782 782 128 205 0 0 0 910 988 Starts In Yr 49 Continues for 20 Yrg 782 30 48 0 0 0 812 830 Starts In Yr 0 Continues for 150 Yrs 782 261 420 0 0 0 1043 1202 ------- Facility Type: Offsite Landfill Size: 123,000 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations Basic Compliance Cost Counterpumping Cost Using; Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1815 0 0 31 0 37 1883 1883 No Corrective Action Necessary 1179 0 0 0 0 0 1179 1179 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 1179 138 221 0 0 0 1317 1400 Starts In Yr 49 Continues for 20 Yrs 1179 32 52 0 0 0 1211 1231 Starts In Yr 0 Continues for 150 Yrs 1179 281 451 0 0 0 1460 1630 ------- Facility Type: OnsIte Landfill Size: 500 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Coats of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) 1SS Baseline 168 0 0 7 0 9 184 184 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 43 0 0 0 0 0 43 43 43 70 100 0 0 0 113 143 Starts In Yr 49 Continues for 20 Yrs 43 17 24 0 0 0 60 67 . Starts In Yr 0 Continues for 150 Yrs 43 147 207 0 0 0 190 250 ------- Facility Type: Onslte Landfill Size: 2,000 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Basic Compliance Cost Count erpump ing Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 211 0 0 8 0 10 229 229 No Corrective Action Necessary 82 0 0 0 0 0 82 82 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 82 76 114 0 0 0 158 196 Starts In Yr 49 Continues for 20 Yrs 82 18 27 0 0 0 100 109 Starts In Yr 0 Continues for 150 Yrs 82 158 234 0 0 0 240 316 ------- Facility Type: Onsite Landfill Size: 5,000 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Basic Compliance Cost Counterpumping Cost Using; Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 278 0 0 9 0 11 298 298 No Corrective Action Necessary 145 0 0 0 0 0 145 145 Starts in Yr 0 Continues for 20 Yrs 145 87 133 0 0 0 232 278 Corrective Action Necessary Starts In Yr 49 ' Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yra 145 21 31 0 0 0 166 176 145 181 276 0 0 0 326 421 ------- Facility Type: Onsite Landfill Size: 7,000 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264:Regulations Basic Compliance Cost Counterpumping Cost Using; Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 320 0 0 10 0 12 342 342 No Corrective Action Necessary 184 0 0 0 0 0 184 184 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 184 90 137 0 0 0 274 321 Starts In Yr 49 > Continues for 20 Yrs 184 21 32 0 0 0 205 216 Starts In Yr 0 Continues for 150 Yrs 184 187 284 0 0 0 371 468 ------- Facility Type: Onslte Landfill Size: 15,000 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264>Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 460 0 0 12 0 15 487 487 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 290 0 0 0 0 0 290 290 290 98 153 0 0 0 388 443 Starts In Yr 49 Continues for 20 Yrs 290 24 36 0 0 0 314 326 Starts In Yr 0 Continues for 150 Yrs 290 203 317 0 0 0 493 607 ------- Facility Type: Onsite Landfill Size: 35,000 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counter pumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 859 0 0 18 0 21 898 898 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 561 0 0 0 0 0 561 561 561 110 179 0 0, 0 671 740 Starts In Yr 49 Continues for 20 Yrs 561 26 42 0 0 0 587 603 Starts In Yr 0 Continues for 150 Yrs 561 225 370 0 0 0 786 931 ------- Facility Type: Onslte Landfill Size: 60,000 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Basic Compliance Cost Counterpumplng Cost Using; Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1247 0 0 23 0 27 1297 1297 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 779 0 0 0 0 0 779 779 779 118 195 0 0 0 897 974 Starts In Yr 49 Continues for 20 Yrs 779 28 46 0 0 0 807 825 Starts In Yr 0 Continues for 150 Yrs 779 241 400 0 0 0 1020 1179 ------- Facility Type: Onsite Landfill Size: 123,000 Metric Tons/Year Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) 1SS Baseline 2081 0 0 31 0 37 2149 2149 No Corrective Action Necessary 1180 0 0 0 0 0 1180 1180 Starts in Yr 0 Continues for 20 Yrs 1180 128 211 0 0 0 1308 1391 Corrective Action Starts In Yr 49 Necessary Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 1180 30 50 0 0 0 1210 1230 1180 261 431 0 0 0 1441 1611 ------- LANDFILL PRINTOUTS II. First Year Cash Requirements A. Single Synthetic Liner for Part 264 D&O 1. Offsite Landfills 2. Onsite Landfills ------- Facility Type: Offsite Landfill Size: 500 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations No Corrective Corrective Action Necessary ISS Action Starts in Yr 0 Starts In Yr 49 Baseline Necessary Continues for 20 Yrs Continues for 20 Yrs Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) 206 31 0 0 0 0 0 0 5 0 211 31 211 31 31 31 185 0 295 0 0 0 0 0 216 31 326 31 Starts In Yr 0 Continues for 150 Yrs 31 185 295 0 0 216 326 ------- Facility Type: Offsite Landfill Size: 2,000 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264!Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 250 0 0 0 6 256 256 No Corrective Action Necessary 48 0 0 0 0 48 48 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 48 205 365 0 0 253 413 Starts In Yr 49 , Continues for 20 Yrs 48 0 0 0 0 48 48 Starts In Yr 0 Continues for 150 Yrs 48 205 365 0 0 253 413 ------- Facility Type: Offsite Landfill Size: 5,000 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 303 0 0 0 7 310 310 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 76 0 0 0 0 76 76 76 255 405 0 0 331 481 Starts In Yr 49 , Continues for 20 Yrs 76 0 0 0 0 76 76 Starts In Yr 0 Continues for 150 Yrs 76 255 405 0 0 331 481 ------- Facility Type: Offsite Landfill Size: 7,000 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 334 0 0 0 8 342 342 No Corrective Action Necessary 92 0 0 0 0 92 92 Corrective Action Necessary Starts In Yr 0 Continues for 20 Yrs 92 265 415 0 0 357 507 Starts In Yr 49 Continues for 20 Yrs 92 0 0 0 0 92 92 Starts In Yr 0 Continues for 150 Yrs 92 265 415 0 0 357 507 ------- Facility Type: Offsite Landfill Size: 15,000 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 425 0 0 0 10 435 435 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 138 0 0 0 0 138 138 138 315 465 0 0 453 603 Starts In Yr 49 Continues for 20 Yrs 138 0 0 0 0 138 138 Starts In Yr 0 Continues for 150 Yrs 138 315 465 0 0 453 603 ------- Facility Type: Offsite Landfill Size: 35,000 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 613 0 0 0 14 627 627 No Corrective i Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 253 0 0 0 0 253 253 253 375 585 0 0 628 838 Starts In Yr 49 Continues for 20 Yrs 253 0 0 0 0 253 253 Starts In Yr 0 Continues for 150 Yrs 253 375 585 0 0 628 838 ------- Facility Type: Offsite Landfill Size: 60,000 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 885 0 0 0 18 903 903 No Corrective Action Necessary 346 0 0 0 0 346 346 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 346 425 685 0 0 771 1031 Starts In Yr 49 : Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 346 0 0 0 0 346 346 346 425 685 0 0 771 1031 ------- Facility Type: Offsite Landfill Size: 123,000 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1499 0 0 0 25 1524 1524 No Corrective Action Necessary 514 0 0 0 0 514 514 Corrective Action Necessary Starts In Yr 0 Continues for 20 Yrs 514 475 795 0 0 989 1309 Starts In Yr 49 Continues for 20 Yrs 514 0 0 0 0 514 514 Starts In Yr 0 Continues for 150 Yrs 514 475 795 0 0 989 1309 ------- Facility Type: Onslte Landfill Size: 500 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 202 0 0 0 5 207 207 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 31 0 0 0 0 31 31 31 185 295 0 0 216 326 Starts In Yr 49 | Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 31 0 0 0 0 31 31 31 185 295 0 0 216 326 ------- Facility Type: Onsite Landfill Size: 2,000 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 246 0 0 0 6 252 252 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 48 0 0 0 0 48 48 48 205 365 0 0 253 413 Starts In Yr 49 Continues for 20 Yrs 48 0 0 0 0 48 48 Starts In Yr 0 Continues for 150 Yrs 48 205 365 0 0 253 413 ------- Facility Type: Onslte Landfill Size: 5,000 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 299 0 0 0 7 306 306 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 76 0 0 0 0 76 76 76 255 405 0 0 331 481 Starts In Yr 49 Continues for 20 Yrs 76 0 0 0 0 76 76 Starts In Yr 0 Continues for 150 Yrs 76 255 405 0 0 331 481 ------- Facility Type: Onsite Landfill Size: 7,000 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 331 0 0 0 8 339 339 No Corrective i Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 93 0 0 0 0 93 93 93 265 415 0 0 358 508 Starts In Yr 49 i Continues for 20 Yrs 93 0 0 0 0 93 93 Starts In Yr 0 Continues for 150 Yrs 93 265 415 0 0 358 508 ------- Facility Type: Onslte Landfill Size: 15,000 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 421 0 0 0 10 431 431 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 139 0 0 0 0 139 139 139 315 465 0 0 454 604 Starts In Yr 49 Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 139 0 0 0 0 139 139 139 315 465 0 0 454 604 ------- Facility Type: Onslte Landfill Size: 35,000 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 608 0 0 0 14 622 622 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 254 0 0 0 0 254 254 254 375 585 0 0 629 839 Starts In Yr 49 Continues for 20 Yrs 254 0 0 0 0 254 254 Starts In Yr 0 Continues for 150 Yrs 254 375 585 0 0 629 839 ------- Facility Type: Onslte Landfill Size: 60,000 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 882 0 0 0 18 900 900 No Corrective Action Necessary 346 0 0 0 0 346 346 Corrective Action Necessary Starts In Yr 0 Continues for 20 Yrs 346 425 685 0 0 771 1031 Starts In Yr 49 Continues for 20 Yrs 346 0 0 0 0 346 346 Starts In Yr 0 Continues for 150 Yrs 346 425 685 0 0 771 1031 ------- Facility Type: Onaite Landfill Size: 123,000 Metric Tons/Year Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Fart 264'Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1495 0 0 0 25 1520 1520 No Corrective Action Necessary 514 0 0 0 0 514 514 Corrective Action Necessary Starts In Yr 0 Continues for 20 Yrs 514 475 795 0 0 989 1309 Starts In Yr 49 i Continues for 20 Yrs 514 0 0 0 0 514 514 Starts In Yr 0 Continues for 150 Yrs 514 475 795 0 0 989 1309 ------- LANDFILL PRINTOUTS II. First Year Cash Requirements B. Double Liner (Synthetic/Clay) for Part 264 D&O 1. Offsite Landfills 2. Onsite Landfills ------- Facility Type: Offslte Landfill Size: 500 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Count erpumping Cost Us ing t Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 206 0 0 0 5 211 211 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 41 0 0 0 0 41 41 41 185 295 0 0 226 336 Starts In Yr 49 Continues for 20 Yrs 41 0 0 0 0 41 41 Starts In Yr 0 Continues for 150 Yrs 41 185 295 0 0 226 336 ------- Facility Type: Offsite Landfill Size: 2,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 250 0 0 0 6 256 256 No Corrective Action Necessary ( 69 0 C 0 0 69 69 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 69 205 365 0 0 274 434 Starts In Yr 49 Continues for 20 Yrs 69 0 0 0 0 69 69 Starts In Yr 0 Continues for 150 Yrs 69 205 365 0 0 274 434 ------- Facility Type: Offsite Landfill Size: 5,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements (? 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 303 0 0 0 7 310 310 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 116 0 0 0 0 116 116 116 255 405 0 0 371 521 Starts In Yr 49 Continues for 20 Yrs 116 0 0 0 0 116 116 Starts In Yr 0 Continues for 150 Yrs 116 255 405 0 0 371 521 ------- Facility Type: Offsite Landfill Size: 7,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Count erpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 334 0 0 0 8 342 342 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 143 0 0 0 0 143 143 143 265 415 0 0 408 558 Starts In Yr 49 . Continues for 20 Yrs 143 0 0 0 0 143 143 Starts In Yr 0 Continues for 150 Yrs 143 265 415 0 0 408 558 ------- Facility Type: Offsite Landfill Size: 15,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264•Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 425 0 0 0 10 435 435 No Corrective I Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 220 0 0 0 0 220 220 220 315 465 0 0 535 685 Starts In Yr 49 ! Continues for 20 Yrs 220 0 0 0 0 220 220 Starts In Yr 0 Continues for 150 Yrs 220 315 465 0 0 535 685 ------- Facility Type: Offsite Landfill Size: 35,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 613 0 0 0 14 627 627 No Corrective Action Necessary 417 0 0 0 0 417 417 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 417 375 585 0 0 792 1002 Starts In Yr 49 Continues for 20 Yrs 417 0 0 0 0 417 417 Starts In Yr 0 Continues for 150 Yrs 417 375 585 0 0 792 1002 ------- Facility Type: Offsite Landfill Size: 60,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using; Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 885 0 0 0 18 903 903 No Corrective Action Necessary 575 0 0 0 0 575 575 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 575 425 685 0 0 1000 1260 Starts In Yr 49 Continues for 20 Yrs 575 0 0 0 0 575 575 Starts In Yr 0 Continues for 150 Yrs 575 425 685 0 0 1000 1260 ------- Facility Type: Offsite Landfill Size: 123,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1499 0 0 0 25 1524 1524 No Corrective Action Necessary 865 0 0 0 0 865 865 i Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 865 475 795 0 0 1340 1660 Starts In Yr 49 Continues for 20 Yrs 865 0 0 0 0 865 865 Starts In Yr 0 Continues for 150 Yrs 865 475 795 0 0 1340 1660 ------- Facility Type: Onsite Landfill Size: 500 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 202 0 0 0 5 207 207 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 50 0 0 0 0 50 50 50 185 295 0 0 235 345 Starts In Yr 49 Continues for 20 Yrs 50 0 0 0 0 50 50 Starts In Yr 0 Continues for 150 Yrs 50 185 295 0 0 235 345 ------- Facility Type: Onsite Landfill Size: 2,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 246 0 0 0 6 252 252 No Corrective i Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 91 0 0 0 0 91 91 91 205 365 0 0 296 456 Starts In Yr 49 : Continues for 20 Yrs 91 0 0 0 0 91 91 Starts In Yr 0 Continues for 150 Yrs 91 205 365 0 0 296 456 ------- Facility Type: Onslte Landfill Size: 5,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counter pumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 299 0 0 0 7 306 306 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 156 0 0 0 0 156 156 156 255 405 0 0 411 561 Starts In Yr 49 Continues for 20 Yrs 156 0 0 0 0 156 156 Starts In Yr 0 Continues for 150 Yrs 156 255 405 0 0 411 561 ------- Facility Type: Onsite Landfill Size: 7,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 331 0 0 0 8 339 339 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 196 0 0 0 0 196 196 196 265 415 0 0 461 611 Starts In Yr 49 Continues for 20 Yrs 196 0 0 0 0 196 196 Starts In Yr 0 Continues for 150 Yrs 196 265 415 0 0 461 611 ------- Facility Type: Onslte Landfill Size: 15,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 421 0 0 0 10 431 431 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 305 0 0 0 0 305 305 305 315 465 0 0 620 770 Starts In Yr 49 Continues for 20 Yrs 305 0 0 0 0 305 305 Starts In Yr 0 Continues for 150 Yrs 305 315 465 0 0 620 770 ------- Facility Type: Onsite Landfill Size: 35,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 608 0 0 0 14 622 622 No Corrective Action Necessary 584 0 0 0 0 584 584 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 584 375 585 0 0 959 1169 Starts In Yr 49 Continues for 20 Yrs 584 0 0 0 0 584 584 Starts In Yr 0 Continues for 150 Yrs 584 375 585 0 0 959 1169 ------- Facility Type: Onsite Landfill Size: 60,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 882 0 0 0 18 900 900 No Corrective Action Necessary 810 0 0 0 0 810 810 i Corrective Action Necessary Starts In Yr 0 Continues for 20 Yrs 810 425 685 0 0 1235 1495 Starts In Yr 49 j Continues for 20 Yrs 810 0 0 0 0 810 810 Starts In Yr 0 Continues for 150 Yrs 810 425 685 0 0 1235 1495 ------- Facility Type: Onsite Landfill Size: 123,000 Metric Tons/Year Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements (S 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Count erpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1495 0 0 0 25 1520 1520 No Corrective Action Necessary 1226 0 0 0 0 1226 1226 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 1226 475 795 0 0 1701 2021 Starts In Yr 49 Continues for 20 Yrs 1226 0 0 0 0 1226 1226 Starts In Yr 0 Continues for 150 Yrs 1226 475 795 0 0 1701 2021 ------- LANDFILL PRINTOUTS II. First Year Cash Requirements C. Double Synthetic Liner for Part 264 D&O 1. Offsite Landfills 2. Onsite Landfills ------- Facility Type: Offslte Landfill Size: 500 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements (S 000) Incremental Coats of Complying with Part 264 Regulations Basic Compliance Cost Count erpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 206 0 0 0 5 211 211 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 38 0 0 0 0 38 38 38 185 295 0 0 223 333 Starts In Yr 49 : Continues for 20 Yrs 38 0 0 0 0 38 38 Starts In Yr 0 Continues for 150 Yrs 38 185 295 0 0 223 333 ------- Facility Type: Offsite Landfill Size: 2,000 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 250 0 0 0 6 256 256 No Corrective Action Necessary ( 75 0 0 0 0 75 75 I Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 75 205 365 0 0 280 440 Starts In Yr 49 ; Starts in ir u Continues for 20 Yrs Continues for 150 Yrs 75 0 0 0 0 75 75 75 205 365 0 0 280 440 ------- Facility Type: Offsite Landfill Size: 5,000 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 303 0 0 0 7 310 310 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 133 0 0 0 0 133 133 133 255 405 0 0 388 538 Starts In Yr 49 Continues for 20 Yrs 133 0 0 0 0 133 133 Starts In Yr 0 Continues for 150 Yrs 133 255 405 0 0 388 538 ------- Facility Type: Offsite Landfill Size: 7,000 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Coats of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 334 0 0 0 8 342 342 No Corrective Action Necessary 170 0 0 0 0 170 170 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 170 265 415 0 0 435 585 Starts In Yr 49 Continues for 20 Yrs 170 0 0 0 0 170 170 Starts In Yr 0 Continues for 150 Yrs 170 265 415 0 0 435 585 ------- Facility Type: Offsite Landfill Size: 15,000 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 425 0 0 0 10 435 435 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 269 0 0 0 0 269 269 269 315 465 0 0 584 734 Starts In Yr 49 Continues for 20 Yrs 269 0 0 0 0 269 269 Starts In Yr 0 Continues for 150 Yrs 269 315 465 0 0 584 734 ------- Facility Type: Offsite Landfill Size: 35,000 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 613 0 0 0 14 627 627 No Corrective Action Necessary 522 0 0 0 0 522 522 i Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 522 375 585 0 0 897 1107 Starts In Yr 49 i Continues for 20 Yrs 522 0 0 0 0 522 522 Starts In Yr 0 Continues for 150 Yrs 522 375 585, 0 0 897 1107 ------- Facility Type: Offsite Landfill Size: 60,000 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 885 0 0 0 18 903 903 No Corrective Action Necessary 727 0 0 0 0 727 727 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 727 425 685 0 0 1152 1412 Starts In Yr 49 Continues for 20 Yrs 727 0 0 0 0 727 727 Starts In Yr 0 Continues for 150 Yrs 727 425 685 0 0 1152 1412 ------- Facility Type: Offsite Landfill Size: 123,000 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1499 0 0 0 25 1524 1524 No Corrective Action Necessary 1102 0 0 0 0 1102 1102 Corrective Action Necessary Starts In Yr 0 Continues for 20 Yrs 1102 475 795 0 0 1577 1897 Starts In Yr 49 Continues for 20 Yrs 1102 0 0 0 0 1102 1102 Starts In Yr 0 Continues for 150 Yrs 1102 475 795 0 0 1577 1897 ------- Facility Type: Onslte Landfill Size: 500 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 202 0 0 0 5 207 207 No Corrective Action Necessary ( 37 0 0 0 0 37 37 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 37 185 295 0 0 222 332 Starts In Yr 49 Continues for 20 Yrs 37 0 0 0 0 37 37 Starts In Yr 0 Continues for 150 Yrs 37 185 295 0 0 222 332 ------- Facility Type: Onslte Landfill Size: 2,000 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 246 0 0 0 6 252 252 No Corrective Action Necessary i 74 0 9 0 0 74 74 Corrective Action Necessary Starts In Yr 0 Continues for 20 Yrs 74 205 365 0 0 279 439 Starts In Yr 49 Continues for 20 Yrs 74 0 0 0 0 74 74 Starts In Yr 0 Continues for 150 Yrs 74 205 365 0 0 279 439 ------- Facility Type: Onsite Landfill Size: 5,000 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 299 0 0 0 7 306 306 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 134 0 0 0 0 134 134 134 255 405 0 0 389 539 Starts In Yr 49 i Continues for 20 Yrs 134 0 0 0 0 134 134 Starts In Yr 0 . Continues for 150 Yrs 134 255 405 0 0 389 539 ------- Facility Type: Onsite Landfill Size: 7,000 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using; Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 331 0 0 0 8 339 339 No Corrective Action Necessary 170 0 0 0 0 170 170 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 170 265 415 0 0 435 585 Starts In Yr 49 Continues for 20 Yrs 170 0 0 0 0 170 170 Starts In Yr 0 Continues for 150 Yrs 170 265 415 0 0 435 585 ------- Facility Type: Onsite Landfill Size: 15,000 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 421 0 0 0 10 431 431 No Corrective Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 269 0 0 0 0 269 269 269 315 465 0 0 584 734 Starts In Yr 49 Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 269 0 0 0 0 269 269 269 315 465 0 0 584 734 ------- Facility Type: Onslte Landfill Size: 35,000 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264iRegulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 608 0 0 0 14 622 622 No Corrective Action Necessary 523 0 0 0 0 523 523 i Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 523 375 585 0 0 898 1108 Starts In Yr 49 Continues for 20 Yrs 523 0 0 0 0 523 523 Starts In Yr 0 Continues for 150 Yrs 523 375 585 0 0 898 1108 ------- Facility Type: Onslte Landfill Size: 60,000 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 882 0 0 0 18 900 900 No Corrective Action Necessary 726 0 0 0 0 726 726 Corrective Action Necessary Starts In Yr 0 Continues for 20 Yrs 726 425 685 0 0 1152 1412 Starts In Yr 49 , Continues for 20 Yrs 726 0 0 0 0 726 726 Starts In Yr 0 Continues for 150 Yrs 726 425 685 0 0 1152 1412 ------- Facility Type: Onslte Landfill Size: 123,000 Metric Tons/Year Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations Basic Compliance Cost Counterpumplng Cost Using; Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 1495 0 0 0 25 1520 1520 No Corrective Action Necessary 1102 0 0 0 0 1102 1102 Corrective Action Necessary Starts In Yr 0 Continues for 20 Yrs 1102 475 795 0 0 1577 1897 Starts In Yr 49 j Continues for 20 Yrs 1102 0 0 0 0 1102 1102 Starts In Yr 0 Continues for 150 Yrs 1102 475 795 0 0 1577 1897 ------- SURFACE IMPOUNDMENT PRINTOUTS I. Annual Revenue Requirements A. Single Synthetic Liner for Part 264 D&O ------- Facility Type: Surface Impoundment Size: .25 Acre Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 32 0 0 4 1 5 42 42 Basic Cost No Corrective Action Necessary 3 0 0 0 0 0 4 4 Corrective Action Starts In Yr 0 Continues for 20 Yrs 3 58 77 0 0 0 61 80 Starts In Continues 20 Yrs 3 15 19 0 0 0 18 22 Necessary Yr 49 Starts In Yr 0 for Continues for 150 Yrs 3 122 163 0 0 0 125 166 ! Facility Retrofit Existing Facility 9 0 0 0 0 0 9 9 Alteration Close Existing and Construct New Facility 8 0 0 7 0 4 19 19 ------- Facility Type: Surface Impoundment Size: ,5 Acre Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 40 0 0 4 1 5 50 50 Basic Cost No Corrective Action Necessary 5 0 0 0 1 0 6 6 Corrective Action Starts in Yr 0 Continues for 20 Yrs 5 58 77 0 1 0 64 83 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 5 15 19 0 1 0 21 25 5 122 163 0 1 0 128 169 . Facility {Retrofit Existing Facility 14 0 0 0 1 0 15 15 Alteration Close Existing and Construct New Facility 13 0 0 7 1 5 26 26 ------- Facility Type: Surface Impoundment Size: 1 Acre Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 54 0 0 4 3 5 66 66 Basic Cost No Corrective Action Necessary 9 0 0 0 1 0 10 10 Corrective Action Starts in Yr 0 Continues for 20 Yrs 9 61 86 0 1 0 71 96 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 9 16 22 0 1 0 26 132 9 128 180 0 1 0 138 190 Facility Retrofit Existing Facility 23 0 0 0 1 0 25 25 Alteration Close Existing and Construct New Facility 22 0 0 7 1 5 35 35 ------- Facility Type: Surface Impoundment Size: 2 Acre Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Basic Compliance Cost Count erpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 78 0 0 4 5 6 93 93 Basic Cost No Corrective Action Necessary 14 0 0 0 2 0 16 16 Corrective Action Starts in Yr 0 Continues for 20 Yrs 14 65 95 0 2 0 81 111 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 14 17 24 0 2 0 133 40 14 138 198 0 2 0 154 214 Facility Retrofit 'Existing Facility 46 0 0 0 2 0 48 48 Alteration Close Existing and Construct New Facility 44 0 0 8 2 5 59 59 ------- Faclfity Type: Surface Impoundment Size: 5 Acre Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) 1SS Baseline 200 0 0 5 14 6 225 225 Basic Cost No Corrective Action Necessary 43 0 0 0 5 0 48 48 Corrective Action Starts in Yr 0 Continues for 20 Yrs 43 71 109 0 5 0 119 157 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 43 18 27 0 5 0 66 75 43 149 225 0 5 0 197 273 Facility Retrofit Existing Facility 87 0 0 0 5 0 92 92 Alteration Close Existing and Construct New Facility 86 0 0 9 5 6 106 106 ------- Facility Type: Surface Impoundment Size: 11 Acre Liner System: Single Synthetic I. Annual Revenue Requirements ($ 000) Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 378 0 0 7 31 8 424 424 Basic Cost No Corrective Action Necessary 85 0 0 0 10 0 95 95 Corrective Action Necessary Facility Alteration Starts In Yr 0 Continues for 20 Yrs 85 81 125 0 10 0 176 220 Starts In Yr 49 Continues for 20 Yrs 85 20 31 0 10 0 115 126 Close Starts In Yr 0 Retrofit Existing and Continues for Existing Construct 150 Yrs Facility New Facility 85 218 225 169 0 0 270 0 0 0 0 10 10 10 10 007 264 228 252 365 228 252 ------- SURFACE IMPOUNDMENT PRINTOUTS I. Annual Revenue Requirements B. Double Liner (Synthetic/Clay) for Part 264 D&O ------- Facility Type: Surface Impoundment Size: .25 Acre Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 32 0 0 4 1 5 42 42 Basic Cost No Corrective Action Necessary 4 0 0 0 0 0 5 5 Corrective Action Starts in Yr 0 Continues for 20 Yrs 4 58 77 0 0 0 62 81 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 4 15 19 0 0 0 19 23 4 122 163 0 0 0 126 167 Facility Retrofit Existing Facility 13 0 0 0 0 0 13 13 Alteration Close Existing and Construct New Facility 11 0 0 7 0 4 23 23 ------- Facility Type: Surface Impoundment Size* .5 Acre Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 40 0 0 4 1 5 50 50 Basic Cost No Corrective Action Necessary 7 0 0 0 1 0 8 8 Corrective Action Starts in Yr 0 Continues for 20 Yrs 7 58 77 0 1 0 65 85 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 7 15 19 0 1 0 23 27 7 122 163 0 1 0 130 171 Facility Retrofit Existing Facility 21 0 0 0 1 0 22 22 Alteration Close Existing and Construct New Facility 19 0 0 7 1 5 31 31 ------- Faciflty Type: Surface Impoundment Size: 1 Acre Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) 1SS Baseline 54 0 0 4 3 5 66 66 Basic Cost No Corrective Action Necessary 12 0 0 0 1 0 13 13 Corrective Action Starts in Yr 0 Continues for 20 Yrs 12 61 86 0 1 0 74 99 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 12 16 22 0 1 0 29 35 12 128 180 0 1 0 141 193 Facility Retrofit Existing Facility 36 0 0 0 1 0 37 37 Alteration Close Existing and Construct New Facility 32 0 0 7 1 5 45 45 ------- Facility Type: Surface Impoundment Size: 2 Acre Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) ISS Baseline Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) 78 0 0 4 5 6 93 93 Basic Cost No Corrective Action Necessary 20 0 0 0 2 0 21 21 Corrective Action Necessary 1 Facility Alteration Close Starts In Yr 0 Starts In Yr 49 Starts In Yr 0 Retrofit Existing and Continues for Continues for Continues for 'Existing Construct 20 Yrs 20 Yrs 150 Yrs 'Facility New Facility 20 65 95 0 2 0 87 117 20 17 24 0 2 0 39 46 20 138 198 0 2 0 160 220 69 0 0 0 2 0 71 71 63 0 0 8 2 5 78 78 ------- Facility Type: Surface Impoundment Size: 5 Acre Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations ISS Baseline Basic Compliance Cost 200 Counterpumplng Cost Using: Strategy 1 0 Strategy 2 0 Post Closure Cost 5 Financial Assurance Costs Closure 14 Post Closure 6 Total Cost (Strategy 1) 225 Total Cost (Strategy 2) 225 Basic Cost No Corrective Action Necessary 63 0 0 0 5 0 68 68 Corrective Action Necessary Starts In Yr 0 Continues for 20 Yrs 63 71 109 0 5 0 139 177 Starts In Yr 49 Continues for 20 Yrs 63 18 27 0 5 0 86 95 Facility Alteration Close Starts In Yr 0 Retrofit Existing and Continues for Existing Construct 150 Yrs Facility New Facility 63 149 225 0 5 0 217 293 143 0 0 0 5 0 148 148 133 0 0 9 5 6 153 153 ------- Facility Type: Surface Impoundment Size: 11 Acre Liner System: Double Liner (Synthetic/Clay) I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Cost Corrective Action Necessary Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 378 0 0 7 31 8 424 424 No Corrective Starts in Yr 0 Action Continues for Necessary 20 Yrs 122 122 0 81 0 125 0 0 10 10 0 0 132 213 132 257 Starts In Yr 49 Continues for 20 Yrs 122 20 31 0 10 0 152 163 Facility Alteration Close Starts In Yr 0 Retrofit Existing and Continues for Existing Construct 150 Yrs Facility New Facility 122 169 270 0 10 0 301 402 338 0 0 0 10 0 348 348 327 0 0 10 10 7 354 354 ------- SURFACE IMPOUNDMENT PRINTOUTS I. Annual Revenue Requirements C. Double Synthetic Liner for Part 264 D&O ------- Facility Type: Surface Impoundment Size .25 Acre Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 32 0 0 4 1 5 42 42 Basic Cost No Corrective Action Necessary 5 0 0 0 0 0 6 6 Corrective Action Starts in Yr 0 Continues for 20 Yrs 5 63 82 0 0 0 68 87 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 5 15 19 0 0 0 20 24 5 131 172 0 0 0 136 177 Facility 'Retrofit Existing Facility 8 0 0 0 0 0 9 9 Alteration Close Existing and Construct New Facility 6 0 0 7 0 4 18 18 ------- Facility Type: Surface Impoundment Size .5 Acre Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations ISS Baseline Basic Compliance Cost Count erpump ing Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) 40 0 0 4 1 5 50 50 Basic Cost No Corrective Action Necessary 8 0 0 0 1 0 9 9 Corrective Action Necessary Starts In Yr 0 Continues for 20 Yrs 8 63 82 0 1 0 72 91 Starts In Yr 49 Continues for 20 Yrs 8 15 19 0 1 0 24 28 i ! Facility Alteration ; Close Starts In Yr 0 [Retrofit Existing and Continues for 'Existing Construct 150 Yrs iFacility New Facility 8 131 172 0 1 0 140 181 18 0 0 0 1 0 18 18 14 0 0 7 1 5 27 27 ------- Facility Type: Surface Impoundment Size: 1 Acre Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations ISS Baseline Basic Compliance Cost Counterpumping Cost Using! Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) 54 0 0 4 3 5 66 66 Basic Cost No Corrective Action Necessary 15 0 0 0 1 0 16 16 Corrective Action Necessary Facility Alteration Starts in Yr 0 Starts In Yr 49 Continues for Continues for 20 Yrs 20 Yrs 15 15 66 16 91 22 0 0 1 1 0 0 82 32 107 38 Close Starts In Yr 0 Retrofit Existing and Continues for Existing Construct 150 Yrs Facility New Facility 15 33 137 0 189 0 0 0 1 1 0 0 153 34 205 34 28 0 0 7 1 5 42 42 ------- Facility Type: Surface Impoundment Size: 2 Acre Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 78 0 0 4 5 6 93 93 Basic Cost No Corrective Action Necessary 23 0 0 0 2 0 25 25 Corrective Action Starts in Yr 0 Continues for 20 Yrs 23 70 100 0 2 0 95 125 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 23 17 24 0 2 0 42 49 23 147 207 0 2 0 172 232 Facility Retrofit Existing Facility 69 0 0 0 2 0 71 71 Alteration Close Existing and Construct New Facility 61 0 0 8 2 5 76 76 ------- Facility Type: Surface Impoundment Size: 5 Acre Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 200 0 0 5 14 6 225 225 Basic Cost No Corrective Action Necessary 76 0 0 0 5 0 81 81 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 76 76 114 0 5 0 157 195 Starts In Yr 49 Continues for 20 Yrs 76 18 27 0 5 0 99 108 ! Facility Alteration j Close Starts In Yr 0 Retrofit Existing and Continues for Existing Construct 150 Yrs Facility New Facility 76 158 234 0 5 0 239 315 153 0 0 0 5 0 157 157 137 0 0 9 5 6 156 156 ------- Facility Type: Surface Impoundment Size: 11 Acre Liner System: Double Synthetic I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 378 0 0 7 31 8 424 424 Basic Cost No Corrective Action Necessary 147 0 0 0 10 0 157 157 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 147 86 130 0 10 0 243 287 Starts In Yr 49 Continues for 20 Yrs 147 20 31 0 10 0 177 188 Starts In Yr Continues for 150 Yrs 147 178 270 0 10 0 335 427 Facility Alteration Close 0 Retrofit Existing and Existing Construct Facility New Facility 364 0 0 0 10 0 374 374 340 0 0 10 10 7 367 367 ------- SURFACE IMPOUNDMENT PRINTOUTS II. First Year Cash Requirements A. Single Synthetic Liner for Part 264 D&O ------- Facility Type: Surface Impoundment Size: .25 Acre Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 112 0 0 1 3 116 116 Basic Cost No Corrective Action Necessary 0 0 0 0 0 0 0 Corrective Action Starts In Yr 0 Continues for 20 Yrs 0 134 184 0 0 134 184 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 0 0 0 0 0 0 0 0 134 184 0 0 134 184 Facility Retrofit Existing Facility 92 0 0 0 0 93 93 Alteration Close Existing and Construct New Facility 68 0 0 0 56 124 124 ------- Facility Type: Surface Impoundment Size: .5 Acre Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 129 0 0 1 3 133 133 Basic Cost No Corrective Action Necessary 0 0 0 1 0 1 1 Corrective Action Starts In Yr 0 Continues for 20 Yrs 0 134 184 1 0 134 184 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 0 0 0 1 0 1 1 0 134 184 1 0 134 184 Facility Retrofit Existing Facility 160 0 0 1 0 160 160 Alteration Close Existing and Construct New Facility 120 0 0 1 57 178 178 ------- Facility Type: Surface Impoundment Size: 1 Acre Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 146 0 0 3 3 152 152 Basic Cost No Corrective Action Necessary 0 0 0 2 0 2 2 Corrective Action Starts in Yr 0 Continues for 20 Yrs 0 144 229 2 0 145 230 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 0 0 0 2 0 2 2 0 144 229 2 0 145 230 Facility Retrofit Existing Facility 307 0 0 2 0 309 309 Alteration Close Existing and Construct New Facility 242 0 0 2 59 303 303 ------- Facility Type: Surface Impoundment Size: 2 Acre Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 193 0 0 6 4 203 203 Basic Cost No Corrective Action Necessary 0 0 0 3 0 3 3 Corrective Action Starts in Yr 0 Continues for 20 Yrs 0 164 274 3 0 167 277 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 0 0 0 3 0 3 3 0 164 274 3 0 167 277 Facility Retrofit Existing Facility 594 0 0 3 0 598 598 Alteration Close Existing and Construct New Facility 479 0 0 3 62 544 544 ------- Facility Type: Surface Impoundment Size: 5 Acre Liner System: Single Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 342 0 0 16 4 362 362 Basic Cost No Corrective Action Necessary 0 0 0 8 0 8 8 Corrective Action Starts in Yr 0 Continues for 20 Yrs 0 184 344 8 0 192 352 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 0 0 0 8 0 8 8 0 184 344 8 0 192 352 Facility Retrofit Existing Facility 1479 0 0 8 0 1487 1487 Alteration Close Existing and Construct New Facility 1253 0 0 8 72 1333 1333 ------- Facility Type: Surface Impoundment Size: 11 Acre Liner System: Single Synthetic II. First Year Cash Requirements <$ 000) Incremental Costs of Complying with Part 264 Regulations Basic Cost Corrective Action Necessary Facility Alteration No Corrective Starts In Yr 0 ISS Action Continues for Baseline Necessary 20 Yrs Basic Compliance Cost 613 0 0 Counterpumplng Cost Using: Strategy 1 00 229 Strategy 2 00 374 Financial Assurance Costs Closure 37 18 18 Post Closure 50 0 Total Cost (Strategy 1) 655 18 247 Total Cost (Strategy 2) 655 18 392 Close Starts In Yr 49 Starts In Yr 0 Retrofit Existing and Continues for Continues for Existing Construct 20 Yrs 150 Yrs Facility New Facility 0 0 3192 2821 0 229 0 0 0 374 0 0 18 18 18 18 0 0 0 97 18 247 3210 2936 18 392 3210 2936 ------- SURFACE IMPOUNDMENT PRINTOUTS II. First Year Cash Requirements B. Double Liner (Synthetic/Clay) for Part 264 D&O ------- Facility Type: Surface Impoundment Size: .25 Acre Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 112 0 0 1 3 116 116 Basic Cost No Corrective Action Necessary 0 0 0 0 0 0 0 Corrective Action Starts In Yr 0 Continues for 20 Yrs 0 134 184 0 0 134 184 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 0 0 0 0 0 0 0 0 134 184 0 0 134 184 Facility Retrofit Existing Facility 126 0 0 0 0 126 126 Alteration Close Existing and Construct New Facility 94 0 0 0 56 150 150 ------- Facility Type: Surface Impoundment Size: .5 Acre Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 129 0 0 1 3 133 133 Basic Cost No Corrective Action Necessary 0 0 0 1 0 1 1 Corrective Action Starts in Yr 0 Continues for 20 Yrs 0 134 184 1 0 134 184 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 0 0 0 1 0 1 1 0 134 184 1 0 134 184 Facility Retrofit Existing Facility 223 0 0 1 0 224 224 Alteration Close Existing and Construct New Facility 169 0 0 1 57 227 227 ------- Facility Type: Surface Impoundment Size: 1 Acre Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 146 0 0 3 3 152 152 Basic Cost No Corrective Action Necessary 0 0 0 2 0 2 2 Corrective Action Starts in Yr 0 Continues for 20 Yrs 0 144 229 2 0 145 230 Starts In Continues 20 Yrs 0 0 0 2 0 2 2 Necessary Yr 49 Starts In Yr 0 for Continues for 150 Yrs 0 144 229 2 0 145 230 Facility Retrofit Existing Facility 426 0 0 2 0 427 427 Alteration Close Existing and Construct New Facility 333 0 0 2 59 394 394 ------- Facility Type: Surface Impoundment Size: 2 Acre Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 193 0 0 6 4 203 203 Basic Cost No Corrective Action Necessary 0 0 0 3 0 3 3 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 0 164 274 3 0 167 277 i i Facility 1 Starts In Yr 49 Starts In Yr 0 Retrofit Continues for Continues for Existing 20 Yrs 150 Yrs Facility 0 0 0 3 0 3 3 0 164 274 3 0 167 277 824 0 0 3 0 827 827 Alteration Close Existing and Construct New Facility 654 0 0 3 62 719 719 ------- Facility Type: Surface Impoundment Size: 5 Acre Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counter pumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 342 0 0 16 4 362 362 Basic Cost No Corrective Action Necessary 0 0 0 8 0 8 8 Corrective Action Starts in Yr 0 Continues for 20 Yrs 0 184 344 8 0 192 352 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 0 0 0 8 0 8 8 0 184 344 8 0 192 352 Facility Retrofit Existing Facility 2036 0 0 8 0 2044 2044 Alteration Close Existing and Construct New Facility 1677 0 0 8 72 1757 1757 ------- Facility Type: Surface Impoundment Size: 11 Acre Liner System: Double Liner (Synthetic/Clay) II. First Year Cash Requirements ($ 000) Incremental Costa of Complying with Part 264 Regulations Basic Cost Corrective Action Necessary Facility Alteration No Corrective Starts In Yr 0 ISS Action Continues for Baseline Necessary 20 Yrs Basic Compliance Cost 613 0 0 Counterpumplng Cost Using: Strategy 1 0 0 229 Strategy 2 00 374 Financial Assurance Costs Closure 37 18 18 Post Closure SO 0 Total Cost (Strategy 1) 655 18 247 Total Cost (Strategy 2) 655 18 392 Close Starts In Yr 49 Starts In Yr 0 Retrofit Existing and Continues for Continues for Existing Construct 20 Yrs 150 Yrs Facility New Facility 0 0 4389 3730 0 229 0 0 0 374 0 0 18 18 18 18 0 0 0 97 18 247 4407 3845 18 392 4407 3845 ------- SURFACE IMPOUNDMENT PRINTOUTS II. First Year Cash Requirements C. Double Synthetic Liner for Part 264 D&O ------- Facility Type: Surface Impoundment Size: .25 Acre Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 112 0 0 1 3 116 116 Basic Cost No Corrective Action Necessary 0 0 0 0 0 0 0 Corrective Action Starts In Yr 0 Continues for 20 Yrs 0 134 184 0 0 134 184 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 0 0 0 0 0 0 0 0 134 184 0 0 134 184 . Facility i Retrofit Existing Facility i 123 0 0 0 0 123 123 Alteration Close Existing and Construct New Facility 86 0 0 0 56 142 142 ------- Facility Type: Surface Impoundment Size: .5 Acre Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations 1 Basic Cost Corrective Action Necessary ' Facility Alteration No Corrective Starts In Yr 0 Starts In Yr 49 ISS Action Continues for Continues for Baseline Necessary 20 Yrs 20 Yrs Basic Compliance Cost 129 00 0 Counterpumping Cost Using: Strategy 1 0 0 134 0 Strategy 2 00 184 0 Financial Assurance Costs Closure 111 1 Post Closure 300 0 Total Cost (Strategy 1) 133 1 134 1 Total Cost (Strategy 2) 133 1 184 1 i Close Starts In Yr 0 Retrofit Existing and Continues for Existing Construct 150 Yrs Facility New Facility 0 225 162 134 0 0 184 0 0 1 1 1 0 0 57 134 226 220 184 226 220 ------- Facility Type: Surface Impoundment Size: 1 Acre Liner System: Double Synthetic II. First Year Gash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 146 0 0 3 3 152 152 Basic Cost No Corrective Action Necessary 0 0 0 2 0 2 2 Corrective Action Necessary Starts In Yr 0 Starts In Yr 49 Starts In Yr 0 Continues for Continues for Continues for 20 Yrs 20 Yrs 150 Yrs 0 144 229 2 0 145 230 0 0 0 2 0 2 2 0 144 229 2 0 145 230 i ! Facility I Retrofit Existing Facility 1 440 0 0 2 0 442 442 Alteration Close Existing and Construct New Facility 329 0 0 2 59 390 390 ------- Facility Type: Surface Impoundment Size: 2 Acre Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 193 0 0 6 4 203 203 Basic Cost No Corrective Action Necessary 0 0 0 3 0 3 3 Corrective Action Starts In Yr 0 Continues for 20 Yrs 0 164 274 3 0 167 277 Necessary Starts In Yr 49 Starts In Yr 0 Continues for Continues for 20 Yrs 150 Yrs 0 0 0 3 0 3 3 0 164 274 3 0 167 277 Facility Retrofit Existing Facility 859 0 0 3 0 862 862 Alteration Close Existing and Construct New Facility 653 0 0 3 62 718 718 ------- Facility Type: Surface Impoundment Size: 5 Acre Liner System: Double Synthetic II. First Year Caah Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counter pumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 342 0 0 16 4 362 362 Basic Cost No Corrective Action Necessary 0 0 0 8 0 8 8 Corrective Action Starts in Yr 0 Continues for 20 Yrs 0 184 344 8 0 192 352 Starts In Continues 20 Yrs 0 0 0 8 0 8 8 Necessary Yr 49 Starts In Yr 0 for Continues for 150 Yrs 0 184 344 8 0 192 352 i Facility Retrofit Existing Facility 2133 0 0 8 0 2141 2141 Alteration Close Existing and Construct New Facility 1685 0 0 8 72 1765 1765 ------- Facility Type: Surface Impoundment Size: 11 Acre Liner System: Double Synthetic II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 613 0 0 37 5 655 655 Basic Cost No Corrective Action Necessary 0 0 0 18 0 18 18 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 0 229 374 18 0 247 392 Starts In Yr 49 Continues for 20 Yrs 0 0 0 18 0 18 18 Starts In Yr 0 Continues for 150 Yrs 0 229 374 18 0 247 392 Facility i Retrofit Existing Facility 4604 0 0 18 0 4622 4622 Alteration Close Existing and Construct New Facility 3753 0 0 18 97 3868 3868 ------- LAND TREATMENT PRINTOUTS I. Annual Revenue Requirements ------- Facility Type: Land Treatment Size: 1.7 Acres I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264iRegulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 68 0 0 15 0 19 102 102 No Corrective Action Necessary C 6 0 0 5 0 6 17 17 Starts In Yr 0 tontinues for 20 Yrs 6 63 89 5 0 6 77 103 Corrective Action Necessary Starts In Yr 49 j Continues for 20 Yrs 6 16 22 5 0 6 31 38 Starts In Yr 0 Continues for 150 Yrs 6 134 187 5 0 6 143 196 ------- Facility Type: Land Treatment Size: 6.5 Acres I. Annual Revenue Requirements ($ 000) Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 70 0 0 15 1 19 104 104 No Corrective Action Necessary < 7 0 0 5 0 6 19 19 Corrective Action Necessary Starts In Yr 0 Continues for 20 Yrs 7 73 114 5 0 6 91 132 Starts In Yr 49 Continues for 20 Yrs 7 19 28 5 0 6 37 46 Starts In Yr u Continues for 150 Yrs 7 154 236 5 0 6 172 254 ------- Facility Type: Land Treatment Size: 20.1 Acres I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 75 0 0 33 1 41 151 151 No Corrective Action Necessary 34 0 0 4 0 6 45 45 Starts In Yr 0 Continues for 20 Yrs 34 85 133 4 0 6 129 177 Corrective Action Necessary Starts In Yr 49 : Starts Continues for 20 Yrs Continues 34 21 33 4 0 6 65 77 In Yr 0 for 150 Yrs 34 178 276 4 0 6 222 320 ------- Facility Type: Land Treatment Size: 74.3 Acres I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 86 0 0 81 4 102 273 273 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 111 0 0 4 0 6 122 122 111 109 180 4 0 6 230 301 Starts In Yr 49 Continues for 20 Yrs 111 27 44 4 0 6 148 165 Starts In Yr 0 Continues for 150 Yrs 111 225 371 4 0 6 346 492 ------- Facility Type: Land Treatment Size: 247.1 Acres I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Post Closure Cost Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 111 0 0 237 12 297 657 657 No Corrective Action Necessary 353 0 0 2 0 5 361 361 Starts In Yr 0 Continues for 20 Yrs 353 140 234 2 0 5 500 594 Corrective Action Necessary Starts In Yr 49 Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 353 34 56 2 0 5 394 416 353 285 472 2 0 5 645 832 ------- LAND TREATMENT PRINTOUTS II. First Year Cash Requirements ------- Facility Type: Land Treatment Size: 1.7 Acres II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 103 0 0 0 12 116 116 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 72 0 0 0 4 76 76 72 154 244 0 4 230 320 Starts In Yr 49 Continues for 20 Yrs 72 0 0 0 4 76 76 Starts In Yr 0 Continues for 150 Yrs 72 154 244 0 4 230 320 ------- Facility Type: Land Treatment Size: 6.5 Acres II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264iRegulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 116 0 0 1 12 129 129 No Corrective i Corrective Action Necessary Action Starts In Yr 0 Necessary Continues for 20 Yrs 77 0 0 0 4 81 81 77 184 344 0 4 265 425 Starts In Yr 49 ' Continues for 20 Yrs 77 0 0 0 4 81 81 Starts In Yr 0 Continues for 150 Yrs 77 184 344 0 4 265 425 ------- Facility Type: Land Treatment Size: 20.1 Acres II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 137 0 0 1 27 166 166 No Corrective Corrective Action Necessary Action Starts in Yr 0 Necessary Continues for 20 Yrs 99 0 0 0 4 103 103 99 244 404 0 4 347 507 Starts In Yr 49 Continues for 20 Yrs 99 0 0 0 4 103 103 Starts In Yr 0 Continues for 150 Yrs 99 244 404 0 4 347 507 ------- Facility Type: Land Treatment Size: 74.3 Acres II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 2641 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 184 0 0 4 68 256 256 No Corrective Action Necessary 134 0 0 0 4 138 138 i Corrective Action Necessary Starts In Yr 0 Continues for 20 Yrs 134 374 604 0 4 512 742 Starts In Yr 49 I Continues for 20 Yrs 134 0 0 0 4 138 138 Starts In Yr 0 Continues for 150 Yrs 134 374 604 0 4 512 742 ------- Facility Type: Land Treatment Size: 247.1 Acres II. First Year Cash Requirements ($ 000) Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Closure Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 263 0 0 14 197 474 474 No Corrective Action Necessary 223 0 0 0 3 226 226 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 223 544 1004 0 3 769 1229 Starts In Yr 49 Continues for 20 Yrs 223 0 0 0 3 226 226 Starts In Yr 0 Continues for 150 Yrs 223 544 1004 0 3 769 1229 ------- WASTE PILE PRINTOUTS I. Annual Revenue Requirements A. Sturdy Impermeable Base + Annual Inspection for Part 264 D&O ------- Facility Type: Wastepile Size: 2,000 Cubic Feet Compliance Option: Inspect Base I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations No Corrective Corrective Action Necessary ISS Action Starts in Yr 0 Starts In Yr 49 i Baseline Necessary Continues for 20 Yrs Continues for 20 Yrs Basic Compliance Cost 14 1 1 1 Counterpumping Cost Using: Strategy 1 0 0 62 15 Strategy 2 0 0 84 20 Financial Assurance Costs Post Closure 06 6 6 Total Cost (Strategy 1) 14 7 69 21 Total Cost (Strategy 2) 14 7 91 27 Starts In Yr 0 Continues for 150 Yrs 1 131 176 6 138 183 ------- Facility Type: Wasteplle Size: 10,000 Cubic Feet Compliance Option: Inspect Base I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations No Corrective Corrective Action Necessary ISS Baseline Basic Compliance Cost 19 Counterpumplng Cost Using: Strategy 1 0 Strategy 2 0 Financial Assurance Costs Post Closure 0 Total Cost (Strategy 1) 19 Total Cost (Strategy 2) 19 Action Starts In Yr 0 Starts In Yr 49 , Necessary Continues for 20 Yrs Continues for 20 Yrs 33 3 0 62 15 0 84 20 66 6 9 71 23 9 93 29 Starts In Yr 0 Continues for 150 Yrs 3 131 176 6 140 185 ------- Facility Type: Waateplle Size: 25,000 Cubic Feet Compliance Option: Inspect Base I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264jRegulations ISS Baseline Basic Compliance Cost 28 Counterpumping Cost Using: Strategy 1 0 Strategy 2 0 Financial Assurance Costs Post Closure 0 Total Cost (Strategy 1) 28 Total Cost (Strategy 2) 28 No Corrective i Corrective Action Necessary Action Starts in Yr 0 Starts In Yr 49 i Necessary Continues for 20 Yrs Continues for 20 Yrs 7 0 0 6 13 13 7 7 62 15 84 20 6 6 75 27 97 33 Starts In Yr 0 Continues for 150 Yrs 7 131 176 6 144 189 ------- Facility Type: Wasteplle Size: 100,000 Cubic Feet Compliance Option: Inspect Base I. Annual Revenue Requirements ($ 000) Basic Compliance Cost Counterpumplng Cost Using; Strategy 1 Strategy 2 Financial Assurance Costs Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 43 0 0 0 43 43 No Corrective Action Necessary 14 0 0 6 20 20 Starts In Yr 0 Continues for 20 Yrs 14 62 84 6 82 104 Corrective Action Necessary Starts In Yr 49 Starts Continues for 20 Yrs Continues 14 15 20 6 35 40 In Yr 0 for 150 Yrs 14 131 176 6 151 197 ------- facility Type: Wastepile Size: 500,000 Cubic Feet Compliance Option: Inspect Base I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) No Corrective ISS Action Starts In Yr 0 Baseline Necessary Continues for 20 Yrs 50 17 17 00 66 00 88 06 6 50 23 89 50 23 111 Corrective Action Necessary Starts In Yr 49 Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 17 17 16 137 21 183 6 6 39 160 44 206 ------- Facility Type: Wasteplle Size: 1,000,000 Cubic Feet Compliance Option: Inspect Base I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264.Regulations No Corrective Corrective Action Necessary ISS Action Starts In Yr 0 Starts In Yr 49 Baseline Necessary Continues for 20 Yrs Continues for 20 Yrs Basic Compliance Cost 57 21 21 21 Counterpumplng Cost Usingj Strategy 1 0 0 67 16 Strategy 2 0 0 93 22 Financial Assurance Costs Post Closure 06 6 6 Total Cost (Strategy 1) 57 27 94 43 Total Cost (Strategy 2) 57 27 120 49 Starts In Yr 0 Continues for 150 Yrs 21 140 194 6 167 221 ------- WASTE PILE PRINTOUTS I. Annual Revenue Requirements B.. Sturdy Impermeable Base + Ground-Water Monitoring for Part 264 D&O ------- Facility Type: Wasteplle Size: 2,000 Cubic Feet Compliance Option: Ground-Water Monitoring I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 14 0 0 0 14 14 No Corrective Action Necessary 9 0 0 6 15 15 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 9 62 84 6 77 99 Starts In Yr 49 Continues for 20 Yrs 9 15 20 6 29 34 Starts In Yr 0 Continues for 150 Yrs 9 131 176 6 145 191 ------- Facility Type: Wasteplle Size: 10,000 Cubic Feet Compliance Option: Ground-Water Monitoring I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations No Corrective ISS Action Starts In Yr 0 Baseline Necessary Continues for 20 Yrs Basic Compliance Cost 19 11 Counterpumplng Cost Using: Strategy 1 00 Strategy 2 00 Financial Assurance Costs Post Closure 0 6 Total Cost (Strategy 1) 19 17 Total Cost (Strategy 2) 19 17 11 62 84 6 79 101 Corrective Action Necessary Starts In Yr 49 Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 11 11 15 131 20 176 6 6 31 148 37 193 ------- Facility Type: Wasteplle Size: 25,000 Cubic Feet Compliance Option: Ground-Water Monitoring I. Annual Revenue Requirements ($ 000) No Corrective ISS Action Starts in Yr 0 Baseline Necessary Continues for 20 Yrs Basic Compliance Cost 28 15 15 Counterpumplng Cost Using: Strategy 1 0 0 62 Strategy 2 0 0 84 Financial Assurance Costs Post Closure 06 6 Total Cost (Strategy 1) 28 21 83 Total Cost (Strategy 2) 28 21 105 Corrective Action Necessary Starts In Yr 49 Continues for 20 Yrs 15 15 20 6 35 41 Starts In Yr 0 Continues for 150 Yrs 15 131 176 6 152 197 ------- Facility Type: Wasteplle Size: 100,000 Cubic Feet Compliance Option: Ground-Water Monitoring I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations No Corrective Corrective Action Necessary ISS Action Starts in Yr 0 Starts In Yr 49 ', Baseline Necessary Continues for 20 Yrs Continues for 20 Yrs Basic Compliance Cost 43 22 22 22 Counterpumplng Cost Using: Strategy 1 0 0 62 15 Strategy 2 0 0 84 20 Financial Assurance Costs Post Closure 06 6 6 Total Cost (Strategy 1) 43 27 89 42 Total Cost (Strategy 2) 43 27 112 47 Starts In Yr 0 Continues for 150 Yrs 22 131 176 6 158 204 ------- Facility Type: Wastepile Size: 500,000 Cubic Feet Compliance Option: Ground-Water Monitoring I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations No Corrective ISS Action Starts in Yr 0 Baseline Necessary Continues for 20 Yrs Basic Compliance Cost 50 21 21 Counterpumping Cost Using: Strategy 1 0 0 61 Strategy 2 0 0 83 Financial Assurance Costs Post Closure 06 6 Total Cost (Strategy 1) 50 27 88 Total Cost (Strategy 2) 50 27 110 Corrective Action Necessary Starts In Yr 49 i Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 21 21 16 128 21 174 6 6 43 155 48 201 ------- Facility Type: Wasteplle Size: 1,000,000 Cubic Feet Compliance Option: Ground-Water Monitoring I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 57 0 0 0 57 57 No Corrective Action Necessary 21 0 0 6 26 26 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 21 62 88 6 89 115 Starts In Yr 49 Continues for 20 Yrs 21 16 22 6 37 49 Starts In Yr 0 Continues for 150 Yrs 21 131 185 6 158 212 ------- WASTE PILE PRINTOUTS I. Annual Revenue Requirements C. Double Liner/Leachate Collection System for Part 264 D&O ------- Facility Type: Wasteplle * Size: 2,000 Cubic Feet Compliance Option: Double Llner/Leachate Collection System I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations No Corrective Corrective Action Necessary Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) 1SS Baseline 14 0 0 0 14 14 Action Starts In Yr 0 Starts In Yr 49 Necessary Continues for 20 Yrs Continues for 20 Yrs 1 1 1 0 62 15 0 84 20 66 6 7 69 22 7 91 27 Starts In Yr 0 Continues for 150 Yrs 1 131 176 6 138 183 ------- Facility Type: Wastepile Size: 10,000 Cubic Feet Compliance Option: Double Liner/Leachate Collection System 1. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using; Strategy 1 Strategy 2 Financial Assurance Costs Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 19 0 0 0 19 19 No Corrective Action Necessary 3 0 0 6 9 9 Starts in Yr 0 Continues for 20 Yrs 3 62 84 6 71 93 Corrective Action Necessary Starts In Yr 49 Starts Continues for 20 Yrs Continues 3 15 20 6 24 29 In Yr 0 for 150 Yrs 3 131 176 6 140 186 ------- Facility Type: Wastepile Size: 25,000 Cubic Feet Compliance Option: Double Llner/Leachate Collection System I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 28 0 0 0 28 28 No Corrective Action Necessary 7 0 0 6 13 13 Starts in Yr 0 Continues for 20 Yrs 7 62 84 6 75 97 Corrective Action Necessary Starts In Yr 49 Starts Continues for 20 Yrs Continues 7 15 20 6 27 33 In Yr 0 for 150 Yrs 7 131 176 6 144 189 ------- Facility Type: Wastepile Size: 100,000 Cubic Feet Compliance Option: Double Llner/Leachate Collection System I. Annual Revenue Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations No Corrective Corrective Action Necessary ISS Action Starts in Yr 0 Starts In Yr 49 Baseline Necessary Continues for 20 Yrs Continues for 20 Yrs Basic Compliance Cost 43 13 13 13 Counterpumplng Cost Using: Strategy 1 0 0 62 15 Strategy 2 0 0 84 20 Financial Assurance Costs Post Closure 06 6 6 Total Cost (Strategy 1) 43 19 81 34 Total Cost (Strategy 2) 43 19 103 39 Starts In Yr 0 Continues for ISO Yrs 13 131 176 6 150 195 ------- Facility Type: Vastepile Size: 500,000 Cubic Feet Compliance Option: Double Llner/Leachate Collection System I. Annual Revenue Requirements ($ 000) Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 50 0 0 0 50 50 No Corrective Action Necessary 11 0 0 6 17 17 Starts In Yr 0 Continues for 20 Yrs 11 66 88 6 79 101 Corrective Action Necessary Starts In Yr 49 Starts Continues for 20 Yrs Continues 11 16 21 6 32 37 In Yr 0 for 150 Yrs 11 137 183 6 148 198 ------- Facility Type: Wasteplle Size: 1,000,000 Cubic Feet Compliance Option: Double Llner/Leachate Collection System I. Annual Revenue Requirements ($ 000) NO ; Corrective Corrective Action Necessary ISS Action Starts In Yr 0 Starts In Yr 49 , Baseline Necessary Continues for 20 Yrs Continues for 20 Yrs Basic Compliance Cost 57 9 9 9 Counterpumplng Cost Using; Strategy 1 00 63 15 Strategy 2 00 89 21 Financial Assurance Costs Post Closure 06 6 6 Total Cost (Strategy 1) 57 15 79 30 Total Cost (Strategy 2) 57 15 105 36 Starts In Yr 0 Continues for 150 Yrs 9 134 187 6 149 202 ------- WASTE PILE PRINTOUTS II. First Year Cash Requirements A. Sturdy Impermeable Base + Annual Inspection for Part 264 D&O ------- Facility Type: Wastepile Size: 2,000 Cubic Feet Compliance Option: Inspect Base II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations ISS Baseline Basic Compliance Cost 53 Counterpumping Cost Using: Strategy 1 0 Strategy 2 0 Financial Assurance Costs Post Closure 0 Total Cost (Strategy 1) 53 Total Cost (Strategy 2) 53 No Corrective Action Starts In Yr 0 Necessary Continues for 20 Yrs 0 0 0 4 4 4 0 144 216 4 147 219 Corrective Action Necessary Starts In Yr 49 Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 0 0 0 144 0 216 4 4 4 147 4 219 ------- Facility Type: Wasteplle Size: 10,000 Cubic Feet Compliance Option: Inspect Base II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations ISS Baseline Basic Compliance Cost 61 Counterpumping Cost Using: Strategy 1 0 Strategy 2 0 Financial Assurance Costs Post Closure 0 Total Cost (Strategy 1) 61 Total Cost (Strategy 2) 61 No Corrective Action Starts In Yr 0 Necessary Continues for 20 Yrs 0 0 0 144 0 • 216 4 4' 4 147 4 219 Corrective Action Necessary Starts In Yr 49 Continues for 20 Yrs 0 0 0 4 4 4 Starts In Yr 0 Continues for 150 Yrs 0 144 216 4 147 219 ------- Facility Type: Wastepile Size: 25,000 Cubic Feet Compliance Option: Inspect Base II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations ISS Baseline Basic Compliance Cost 71 Counterpumplng Cost Using: Strategy 1 0 Strategy 2 0 Financial Assurance Costs Post Closure 0 Total Cost (Strategy 1) 71 Total Cost (Strategy 2) 71 No Corrective Action Starts in Yr 0 Necessary Continues for 20 Yrs 0 0 0 144 0 216 4 4 4 147 4 219 Corrective Action Necessary Starts In Yr 49 Continues for 20 Yrs 0 0 0 4 4 4 Starts In Yr 0 Continues for 150 Yrs 0 144 216 4 147 219 ------- Facility Type: Wasteplle Size: 100,000 Cubic Feet Compliance Option: Inspect Base II. First Year Cash Requirements ($ 000) Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 99 0 0 0 99 99 No Corrective Action Necessary 0 0 0 4 4 4 Starts In Yr 0 Continues for 20 Yrs 0 144 216 4 147 219 Corrective Action Necessary Starts In Yr 49 | Starts Continues for 20 Yrs Continues 0 0 0 4 4 4 In Yr 0 for 150 Yrs 0 144 216 4 147 219 ------- Facility Type: Wastepile 'Size: 500,000 Cubic Feet Compliance Option: Inspect Base II. First Year Cash Requirements <$ 000) Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 185 0 0 0 185 185 No Corrective Action Necessary 0 0 0 4 4 4 Starts in Yr 0 Continues for 20 Yrs 0 144 216 4 147 219 Corrective i Action Necessary Starts In Yr 49 . Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 0 0 0 4 4 4 0 144 216 4 147 219 ------- Facility Type: Wastepile Size: 1,000,000 Cubic Feet Compliance Option: Inspect Base II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations ISS Baseline Basic Compliance Cost 258 Counterpumping Cost Using: Strategy 1 0 Strategy 2 0 Financial Assurance Costs Post Closure 0 Total Cost (Strategy 1) 258 Total Cost (Strategy 2) 258 No Corrective Action Starts in Yr 0 Necessary Continues for 20 Yrs 0 0 0 149 0 244 4 4 4 152 4 247 i Corrective Action Necessary Starts In Yr 49 Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 0 0 0 149 0 244 4 4 4 152 4 247 ------- WASTE PILE PRINTOUTS II. First Year Cash Requirements B. Sturdy Impermeable Base + Ground-Water Monitoring for Part 264 D&O ------- Facility Type: Wastepile Size: 2,000 Cubic Feet Compliance Option: Ground-Water Monitoring II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations No Corrective Corrective Action Necessary Basic Compliance Cost Counterpumplng Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Action Starts in Yr 0 Starts In Yr 49 Baseline Necessary Continues for 20 Yrs Continues for 20 Yrs 53 40 40 40 0 0 144 0 0 0 216 0 04 4 4 53 44 187 44 53 44 259 44 Starts In Yr 0 Continues for 150 Yrs 40 144 216 4 187 259 ------- Facility Type: Wasteplle Size: 10,000 Cubic Feet Compliance Option: Ground-Water Monitoring II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264iRegulations No Corrective Corrective Action Necessary ISS Action Starts in Yr 0 Starts In Yr 49 Baseline Necessary Continues for 20 Yrs Continues for 20 Yrs Basic Compliance Cost 61 40 40 40 Count erpumplng Cost Usingj Strategy 1 0 0 144 0 Strategy 2 00 216 0 Financial Assurance Costs Post Closure 04 4 4 Total Cost (Strategy 1) 61 44 187 44 Total Cost (Strategy 2) 61 44 259 44 Starts In Yr 0 Continues for 150 Yrs 40 144 216 4 187 259 ------- Facility Type: Wastepile 'Size: 25,000 Cubic Feet Compliance Option: Ground-Water Monitoring II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations No Corrective ISS Action Starts in Yr 0 Baseline Necessary Continues for 20 Yrs Basic Compliance Cost 71 40 40 Counterpumping Cost Using: Strategy 1 00 144 Strategy 2 00 216 Financial Assurance Costs Post Closure 04 4 Total Cost (Strategy 1) 71 44 187 Total Cost (Strategy 2) 71 44 259 Corrective Action Necessary Starts In Yr 49 Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 40 40 0 144 0 216 4 4 44 187 44 258 ------- Facility Type: Wastepile Size: 100,000 Cubic Feet Compliance Option: Ground-Water Monitoring II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations No Corrective Corrective Action Necessary ISS Action Starts In Yr 0 Starts In Yr 49 Baseline Necessary Continues for 20 Yrs Continues for 20 Yrs Basic Compliance Cost 99 40 40 40 Counterpumping Cost Dsing_: Strategy 1 0 0 144 0 Strategy 2 00 216 0 Financial Assurance Costs Post Closure 04 4 4 Total Cost (Strategy 1) 99 44 187 44 Total Cost (Strategy 2) 99 44 259 44 Starts In Yr 0 Continues for 150 Yrs 40 144 216 4 187 259 ------- Facility Type: Wastepile Size: 500,000 Cubic Feet Compliance Option: Ground-Water Monitoring II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 185 0 0 0 185 185 No Corrective Action Necessary 40 0 0 4 44 44 Corrective Action Necessary Starts in Yr 0 Continues for 20 Yrs 40 144 216 4 187 259 Starts In Yr 49 Continues for 20 Yrs 40 0 0 4 44 44 Starts In Yr 0 Continues for 150 Yrs 40 144 216 4 187 259 ------- Facility Type: Wasteplle Size: 1,000,000 Cubic Feet Compliance Option: Ground-Water Monitoring II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 258 0 0 0 258 258 No Corrective Action Necessary 40 0 0 4 44 44 Starts in Yr 0 Continues for 20 Yrs 40 149 244 4 192 287 Corrective Action Necessary Starts In Yr 49 | Starts Continues for 20 Yrs Continues 40 0 0 4 44 44 In Yr 0 for 150 Yrs 40 149 244 4 192 287 ------- WASTE PILE PRINTOUTS II. First Year Cash Requirements C. Double Liner/Leachate Collection System for Part 264 D&O ------- Facility Type: Wastepile Size: 2,000 Cubic Feet Compliance Option: Double Llner/Leachate Collection System II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264jRegulations No Corrective ISS Action Starts In Yr 0 Baseline Necessary Continues for 20 Yrs Basic Compliance Cost 53 8 8 Counterpumplng Cost Using: Strategy 1 0 0 144 Strategy 2 00 216 Financial Assurance Costs Post Closure 04 4 Total Cost (Strategy 1) 53 12 155 Total Cost (Strategy 2) 53 12 227 i Corrective Action Necessary Starts In Yr 49 j Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 8 8 0 144 0 216 4 4 12 155 12 227 ------- Facility Type: Wasteplle Size: 10,000 Cubic Feet Compliance Option: Double Llner/Leachate Collection System II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations No Corrective ISS Action Starts In Yr 0 Baseline Necessary Continues for 20 Yrs Basic Compliance Cost 61 8 Counterpumplng Cost Using; Strategy 1 00 Strategy 2 00 Financial Assurance Costs Post Closure 0 4 Total Cost (Strategy 1) 61 12 Total Cost (Strategy 2) 61 12 8 144 216 4 155 227 Corrective Action Necessary Starts In Yr 49 Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 8 8 0 144 0 216 4 4 12 155 12 227 ------- Facility Type: Wasteplle Size: 25,000 Cubic Feet Compliance Option: Double Llner/Leachate Collection System II. First Year Cash Requirements ($ 000) Incremental Coats of Complying with Part 264'Regulations Basic Compliance Cost Counterpumping Cost Using: Strategy 1 Strategy 2 Financial Assurance Costs Post Closure Total Cost (Strategy 1) Total Cost (Strategy 2) ISS Baseline 71 0 0 0 71 71 No Corrective Action Necessary 8 0 0 4 12 12 Starts in Yr 0 Continues for 20 Yrs 8 144 216 4 155 227 i Corrective Action Necessary Starts In Yr 49 , Starts Continues for 20 Yrs Continues 8 0 0 4 12 12 In Yr 0 for 150 Yrs 8 144 216 4 155 227 ------- Facility Type: Wasteplle Size: 100,000 Cubic Feet Compliance Option: Double Liner/Leachate Collection System II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations No Corrective ISS Action Starts In Yr 0 Baseline Necessary Continues for 20 Yrs Basic Compliance Cost 99 8 8 Counterpumplng Cost Usingj Strategy 1 00 144 Strategy 2 00 216 Financial Assurance Costs Post Closure 04 4 Total Cost (Strategy 1) 99 12 155 Total Cost (Strategy 2) 99 12 227 Corrective Action Necessary Starts In Yr 49 Continues for 20 Yrs 8 0 0 4 12 12 Starts In Yr 0 Continues for 150 Yrs 8 144 216 4 155 227 ------- Facility Type: Wasteplle Size: 500,000 Cubic Feet Compliance Option: Double Liner Leachate/Collectlon System II. First Tear Cash Requirements ($ 000) Incremental Costs of Complying with Part 264'Regulations No Corrective ISS Action Starts in Yr 0 Baseline Necessary Continues for 20 Yrs Basic Compliance Cost 185 10 10 Counterpumplng Cost Using: Strategy 1 0 0 144 Strategy 2 00 216 Financial Assurance Costs Post Closure 04 4 Total Cost (Strategy 1) 185 14 158 Total Cost (Strategy 2) 185 14 230 Corrective Action Necessary Starts In Yr 49 Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 10 10 0 144 0 216 4 4 14 158 14 230 ------- Facility Type: Wasteplle Size: 1,000,000 Cubic Feet Compliance Option: Double Liner/Leachate Collection System II. First Year Cash Requirements ($ 000) Incremental Costs of Complying with Part 264 Regulations No Corrective ISS Action Starts in Yr 0 Baseline Necessary Continues for 20 Yrs Basic Compliance Cost 258 13 13 Counterpumping Cost Using: Strategy 1 0 0 149 Strategy 2 00 244 Financial Assurance Costs Post Closure 04 4 Total Cost (Strategy 1) 258 17 165 Total Cost (Strategy 2) 258 17 260 Corrective Action Necessary Starts In Yr 49 Starts In Yr 0 Continues for 20 Yrs Continues for 150 Yrs 13 13 0 149 0 244 4 4 17 165 17 260 ------- |