Data as of 30 September 1990
 Superfund
   Annual
Management
   Reports

              Print Date: 01/04/90

-------
                                    Table  of Contents
Section I: FY1990 Targets and Accomplishments	M
    1. Pre-Remedial and Remedial Program Performance	1-2
    2. Proactive Report	1-3
    3. Seventeen Individual Graphs of SCAP/STARS Accomplishments
       3.1. PA and SI Completions	1-4
      3.2. Removal Starts and Obligations	
      3.3. RI/FS Starts and Completions	
      3.4. First RODs Performance Against Annual Target	
      3.5. Subsequent RODs Performance Against Annual Target	
      3.6. RD/RA Negotiation Completions Against Annual Target	
      3.7. First RD Starts Performance Against Annual Target	
      3.8. First RA Starts Performance Against Annual Target	
      3.9. Status of Planned FY90 Fund Lead RA Projects	
      3.10. OSWER25: 106 Removal Orders at NPL Sites	
      3.11. OSWER 26: 106 Removal Orders at Non-NPL Sites	
      3.12. OSWER 27: Section 107 Referrals for Pre-Remedial Costs	
      3.13. OSWER 28: Section 107 Referrals for Remedial Actions	
      3.14. OSWER 31:  Cost Recovery from Litigation Settlement, AOs, Oversight
      3.15. OSWER 32:  Section 106 Civil Referrals for RD/RA W/O Settlement	
      3.16. OSWER 33:  Section 106 Referral/Order for RD/RA with Settlement	
      3.17. OSWER 34:  Sites Issued RD/RA Unilateral Administrative Orders	
   4. FY 1990 SCAP/STARS Summary Report
  o
  o
-10
-11
-12
-13
-14
-15
-16
-17
-18
-19
-20
-21
Section II: Regional Commitments and Obligations	n-1
   1. Removal Allowance	II-2
   2. RI/FS Allowance	II-3
   3. Remedial Design Allowance	II-4
   4. Remedial Action Allowance	II-5
   5. Other Remedial Allowance	II-6

-------
                                     Table  of Contents
Section in: A National Perspective of the Superfund Program	m-1
   1. Site Data	.	..	.	 jjj.3
       1.1. Inventory Assessment	IH-5
       1.2. Current NPL Site Activity	HI-6
       1.3. Work Begun at NPL Sites	HI-7
       1.4. Pipeline Progress of Superfund Sites	IH.g
       1.5. Increasing Activity at Superfund Sites	IH-9
       1.6. Removal Activity at Superfund Sites	HMO
       1.7. Numbers Matrix	III-ll
       1.8. Site Inventory and Progress Towards SARA Targets	Ill-14
       1.9. Completion and Deletion Status of NPL Sites	IIM5
       1.10. Superfund Site Completions and Deletions from the NPL	IIM8
   2. Enforcement Data	...	...	.	...	.	.	.......	...	ffl-19
       2.1. Value of PRP Response Settlements	HI-20
       2.2. Cost Recovery Referrals to HQ/DOJ (>$200,000> Combined Pre-Remedial and Remedial	111-21
       2.3. Settlement for Cost Recovery	HI-22
       2.4. Responsible Party Involvement	111-23
       2.5. Cumulative Cost Recovery Collections	111-24
   3. Budget Data..........—......	...........................	...	.....	...	...	..	m-25
       3.1.FY90 Superfund Appropriation	111-26
       3.2. Superfund FY90 Response Funding	IH-27
       3.3. FY91 Superfund Budget	IH-28
       3.4. FY91 Superfund Response Budget	111-29
      3.5. Superfund Obligation History & Funding Requirements by Fiscal Year	111-30
      3.6. FTE Summary	IH-31

-------
                                    Table  of Contents
   4. Project Data	............	[[[in-32
       4.1. Pipeline Progress of Super-fund Projects	IH-33
       4.2. Remedial Program Project Accomplishments	111-34
       4.3. Ongoing NPL Work	IH-35
       4.4. Superfund Removal Actions	111-36
       4.5. Removal Action Starts and Completions by Fiscal Year	111-37
       4.6. Removal Action Starts and Completions - Fund Lead	111-38
       4.7. Emergency Response Division FY87-90 Fund Lead Starts	111-39
       4.8. Emergency Response Division FY87-90 Fund Lead Completions	IH-40
       4.9. Removal Action Summary Responsible Party Lead Starts and Completions FY 87-89	IH-41
Section IV : Analysis of Program Implementation	IV-i
   1. Cost and Duration of Events
       1.1. Duration and Dollars	IV-3
       1.2. Average Duration and Cost of RI/FS	IV-4
       1.3. RI/FS Duration by Region	IV-5
       1.4. Operable Units with Duration from ROD to RD Greater than 8 Months	IV-6
       1.5. Duration from First ROD to Remedial Design Start	IV-7
       1.6. Duration from First Fund ROD to Fund RD Actual Start	IV-8
       1.7. Duration from First RP ROD to RD/RA Negotiation Completion	IV-9
       1.8. Removal Starts and Completions	IV-10
       1.9. Removal (Fund) Starts and Completions	IV-11
       1.10. Addressed NPL Universe Sites - RA Started and Average Duration from RI/FS Start to RA Start	IV-12
   2. Trend Analysis - RP Involvement  in Superfund

-------
 Section I:  FY 1990 Targets and Accomplishments
1.  Pre-Remedial and Remedial Program Performance
   This bar chart displays the percent of Annual targets achieved in the major pre-remedial and remedial
   program areas.
2.  Proactive Report
   This report shows the planned events and activities for the current quarter and the number of sites slipping
   to upcoming quarters or to the next fiscal year.
3.  Seventeen Individual Graphs on SCAP/STARS Accomplishments
   These bar charts graphically present specific program accomplishments and targets for each Region.


4.  FY 1990 SCAP/STARS Targets and Accomplishments Summary Reports
   These reports display Annual targets and accumulated accomplishment totals by SCAP activity (e.g., first
   removal starts at NPL sites, subsequent removal completions at non-NPL sites, first RI/FS completions,
   RD/RA referrals) for each Region for FY 1990.

                                          1-1

-------
                   PRE-REMEDIAL AND REMEDIAL PROGRAM PERFORMANCE
P
e
r
c
e
n
t

o
f

T
a
r
g
e
t
s
    150-r
125
100--
       0
             PA
            Comp
                     SI
                   Comp
RI/FS
Start
RI/FS
Comp
 RD
Start
 RA
Start
Final
 RA
  NPL
Deletion
   Source: FY 90 Targets and Accomplishments Report
   MGMT-07 Chart-1.1
                                                                                 Pull Date: 10/19/90
                                                                                Print Date: 12/07/90
                                                1-2

-------
                                       PROACTIVE  REPORT  4TH QTR FY90
                NUMBER OF UNACCOMPLISHED ACTIVITIES/EVENTS FOR 4TH QTR FY90 THROUGH
         SEPTEMBER  30, 1990  INCLUDING NUMBER SLIPPED  FROM CURRENT QUARTER  TO FUTURE QUARTERS
Region
First RODs
Fund
Slipped *
RP (FE)
Slipped *
Federal Facility
Slipped *
Subsequent RODs
Fund
Slipped *
RP (FE)
Slipped *
Federal Facility
Slipped *
RD First Start
Fund
Slipped *
RP
Slipped *
Federal Facility
Slipped *
RA First Start
Fund
Slipped *
RP
Slipped *
Federal Facility
Slipped *
NPL Deletion Initiation
Unaccomplished
Slipped *
1

0
0
2
2
0
0

2
2
1
1
0
0

0
0
3
3
0
0

0
0
3
3
0
0

0
0
2

1
1
1
1
1
1

0
0
0
0
2
2

7
7
4
4
3
3

0
0
5
5
1
I

I
1
3

3
3
6
6
2
2

8
8
1
1
3
3

1
1
4
4
3
3

0
0
1
1
1
1

3
3
4

3
3
3
3
5
5

0
0
0
0
0
0

1
1
6
6
0
0

0
0
2
2
0
0

0
0
5

1
1
5
5
0
0

3
3
3
3
1
1

5
5
4
4
1
1

0
0
3
3
0
0

2
2
6

0
0
0
0
0
0

0
0
0
0
0
0

0
0
1
1
0
0

0
0
1
1
0
0

3
3
7

0
0
0
0
0
0

0
0
0
0
2
2

0
0
0
0
0
0

0
0
0
0
0
0

0
0
8

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
1
1
0
0

0
0
9

0
0
0
0
0
0

1
1
0
0
0
0

0
0
1
1
0
0

0
0
0
0
a
0

0
0
10

0
0
1
1
3
3

0
0
0
0
0
0

0
0
0
0
1
1

0
0
1
1
0
0

0
0
TOTAL

8
8
18
18
11
11

14
14
5
5
8
8

14
14
23
23
8
8

0
0
17
17
2
2

9
9
•Subset of target heading: For example. Region 4 is responsible for starting three enforcement /RP lead first ROOs. Of the three first RODs, three were
originally targeted for the first four quarters, but have slipped.
Source: FY90 Targets and Accomplishments Report

MGMT-02
                                                   1-3
Pull date: 10/19/90

Print date: 11/4/90

-------
                    PA AND SI COMPLETIONS
                       through September 30,1990

  National PA Target: 1920         PA Completions
  National PA Accomplishment: 1592
    500-r
                                  395
Targets

Accomplishments
                                                            300
                                                              313
                                    5     6
                                   REGIONS
                     10
  National SI Target: 1660
  National SI Accomplishment: 1906
                           SI Completions
    SOO-r
                                              Targets

                                              Accomplishments
                                                              128
                                    5     6
                                   REGIONS
Source: FY 90 Targets and Accomplishments Report
MGMT-01N Chart-1.6
             Pull Date: 10/19/90
             Print Date: 11/08/90
                                   1-4

-------
         REMOVAL STARTS AND OBLIGATIONS*
                                     212
                                567
                                REGIONS
         Removal Starts as a Percent of Annual Target (combined NPL and Non-NPL)

         Obligations as a Percent of Quarterly Allowance
                                                   10
                   REMOVAL ACTIONS AS OF 9/30/90
          TOTAL
     REMOVAL STARTS
    (NPL AND NON-NPL)
FUND
PRP
TOTAL
253
98
351
     TOTAL
  OBLIGATIONS/
   ESTIMATED
RESPONSE VALUE

    $104.42M

    $86.92M
    S191.34M
 * Removal Starts include NPL and non-NPL Removals.

Source: FY 90 Targets and Accomplishments
     Report and FY90 Regional Commitments/Obligations (FMD)
MGMT - 01M Chart -1.7
  NPL
ANNUAL
TARGET
STARTS

  37

  10
  47
     NPL
   STARTS

     43

     33
     76



Pull Date:  10/19/90

Print Date: 11/15/90
                                1-5

-------
           RI/FS STARTS AND COMPLETIONS
                  (First and Subsequent)
                        s
                                       Untargeted Accomplishments

                                       Unaccomplished Targets

                                       Targeted Accomplishments
                                  S = Start C = Completion
 FUND
 PRP
 FF
  FY
STARTS

  78

  74

  154
 REGIONS

  FY
 START
TARGET

  62

  67

  128
                                                           10
                                                         FY
                                             FY      COMPLETION
                                        COMPLETIONS    TARGET
    TOTAL      306

 ' Number of u ntargeted accomplishments.
                 257
74

78

18
                 170
83

85

28

196
Region
Start
Completion
1
4
0
2
13
5
3
28
12
4
37
4
5
9
4
6
2
4
7
6
2
8
7
7
9
4
2
10
4
0
Source: FY 90 Targets and Accomplishments Report
MGMT- 01B Chart -1.6 Chart -1.8
                                        Pull Date: 10/19/90
                                        Print Date: 1/04/90
                               1-6

-------
  FIRST RODS PERFORMANCE AGAINST ANNUAL TARGET
    30-r
                                                fj  Behind Schedule

                                                £3  On Schedule

                                                •  Signed
    FUND
    PRP
    TOTAL
FY TARGET

   51
   77
                                 5     6
                                 REGIONS
ESTIMATE

   52
   66
                                    8
                             10
   128
  118
SIGNED
  49
  62
  111
  First ROD Performance Against Cumulative Target For Elapsed Quarters

    150-,                                                 148

    125-
                      3456
                                 REGIONS
    A blank equals zero unless indicated as NT (No Target).
* Number of untargeted accomplishments.
                                    8
                            10
Region

1
0
2
3
3
5
4
0
5
2
6
2
7
1
8
0
9
2
10
0
 Source: FY 90 Targets and Accomplishments Report
 MGMT-01E Chart-1.9
                                     Pull Date: 10/19/90
                                     Print Date: 12/19/90
                                1-7

-------
        SUBSEQUENT RODS  PERFORHAHCE AGAIHST AHHUAL TARGET FOR  FY96
       88-
       15-
       1BH
                          12
                                                                           10
FUND
PRP
TOTRL
FY TRRGET
     38
             •13
ESTIMATE
    38
SIGNED
   as
                                      •41
Behind Scheduli
On Schedule
Si»n«d
 Subsequent ROD  Performance Against Cumulative Target For Elapsed Qtrs.
                  133
                        580
                        208    158
  p
  e
  r
  c
  e
  n
  t
                                                                           18
e
z
7 •
t a
i
i
e
8
0
NOTE : NT - No Target
                Number  Of  Untargeted Rccomplishm«nt«
Source: FY90 Targets and Accomplishments Report
MGMT - OIF
                                    1-8
                                                         Pull Date:  10/19/90
                                                        Print Date:  10/27/90

-------
      RD/RA NEGOTIATION COHPLETIOHS AGAINST ANNUAL TARGET FOR FY98
       33 n
                                       26
NRTIONRL
FY TARGET
   138
FY COMPLETED
      113
Behind Schedule
On Schedule
Contpl e ted
                 RD/RA Negotiation Completion Performance
              Against Cumulative Target For Elapsed Quarters
                                             120    125
                                                    133
  T
  C
  e
  n
  t
1
2
9
8
8
1
3 '
I 7
8
                       Homber Of Untarsreted  Accomplishments
Source: FY90 Targets and Accomplishments Report
MGMT - 01J
                                                  Pull Date: 10/19/90
                                                 Print Date: 10/27/90
                                    1-9

-------
FIRST RD STARTS PERFORMANCE AGAINST ANNUAL TARGET
  30-r
                                24
                                              fj Behind Schedule

                                              fH On Schedule

                                              • Started
                                5     6
                                REGIONS
                                  8
                         10
 FUND
 PRP
 TOTAL
FY TARGET
   39
   65
   104
ESTIMATED
   27
   50
   77
STARTED
   29
   51
   80
First RD Performance Against Cumulative Target for Elapsed Quarters
                                 5     6
                                REGIONS
Region   1   23456789  10
      1150301100
Source: FY 90 Targets and Accomplishments Report
MGMT-01G Chart-1.13
                                  8
                         10
                                                         NT=No Target
                                     Pull Date: 10/19/90
                                     Print Date: 10/27/90
                               1-10

-------
  FIRST RA STARTS PERFORMANCE AGAINST ANNUAL TARGET
                                                      Behind Schedule
                                                      On Schedule
                                                      Started
     FUND
     PRP
     TOTAL
FY TARGET
    3
   33
   36
 5      6
 REGIONS

ESTIMATE
   20
   21
   41
                                                       8
STARTED
   19
   23
   42
                                                   10
First RA Starts Performance Against Cumulative Target for Elapsed Qtrs
  250-r
                                                200
                                                             150
                                   5      6
                                  REGIONS
                                                   10
   'Number of untargeted accomplishments
Region

1
0
2
5
3
2
4
1
5
0
6
2
7
1
8
2
9
1
10
0
  Source: FY 90 Targets and Accomplishments Report
  MGMT-01HChart-1.14
                      A blank equals zero unless indicated as NT (No Target),
                                         Pull Date: 10/19/90
                                        Print Date: 10/27/90
                                  1-11

-------
   Current Status  of FY 90 Fund-lead  RAs
   Compared to Beginning of Year Plan
 c
 o
 s
 t

 I
 n

 M
 i
 I
 I
 i
 o
 n
 s
      300
250
200
150
100
50.
             - Original List
             Current List
             - Slipped
             - Queued
             - Funded or Enforcement
               Takeover
NOTE:  1.  Current List includes several ongoing and long-term
          response projects not included on the original list.
       2.  Slipped projects include projects that are anticipated to
          be enforcement takeovers in 1991.
Chart-1.15
             (5) (7)  (21) (35)  (13)(21)  (16)(22)   (11)(19)  (7)  (7)    (4) (3)   (3) (5)
               12345678
                                                    Regions
                                                                                    (5) (8)   (3) (6)
                                                                                       9        10
                                                                                             Pull Date: 10/19/90
                                                                                             Print Date 12/28/90
                                                          1-12

-------
o
r
d
e
r
s

I
s
s
u
e
d
                  OSWER 25: 106 REMOVAL ORDERS AT NFL SITES
                                   (FY1990 Performance)
                 II
IX
                                                                          Total Annual Performance: 40
                 4th Quarter Actual

                 3rd Quarter Actual

                 2nd Quarter Actual

                 1st Quarter Actual
                                             12/11/90-15:12

                                               1-13
                              [OSWER 25 FY90]

-------
OSWER 26: 106 REMOVAL ORDERS AT NON-NPL SITES
                 (FY1990 Performance)
                                                           Total Annual Performance: 96
              IV
VI     VI]    VIII    IX
                                                                  4th Quarter Actual
                                                                  3rd Quarter Actual
                                                                  2nd Quarter Actual
                                                                  1st Quarter Actual
                             12/11/90-15:14
                                1-14
                                                   [OSWER 26 FY90]

-------
OSWER 27: SECTION 107 REFERRALS FOR PRE-REMEDIAL COSTS <>=$200K)
                    (FY1990 Performance Against Targets)                  Tolal National Target: 47
                                                                   Total Annual Performance: 57
                                                                 Percent of Target Achieved: 119%
          II      HI    IV     V     VI     VII   VIII    IX
                                                                           4th Quarter Actual

                                                                           3rd Quarter Actual

                                                                           2nd Quarter Actual

                                                                           1st Quarter Actual

                                                                           Annual Target
                                     11/29/90-1:02 PM

                                         1-15
[OSWER 27 FY90]

-------
OSWER 28: SECTION 107 REFERRALS FOR REMEDIAL ACTIONS <>=$200K)
                  (FY1990 Performance Against Targets)                  7otal Nabonal Tar«et: 21
                                                                  Total Annual Performance: 22
                                                                Percent of Target Achieved: 105%
                HI    IV     V     VI     VII   VIII    IX     X
                                                                          4th Quarter Actual


                                                                          3rd Quarter Actual


                                                                          2nd Quarter Actual


                                                                          1st Quarter Actual


                                                                          Annual Target
                                    11/29/90-1 KB PM

                                       1-16
[OSWER 28 FY90]

-------
 OSWER 31: COST RECOVERY FROM LITIGATION SETTLEMENT, AOs, OVERSIGHT
                           (FY1990 Performance $ X 1,000)
                                                                  Total Annual Performance: $88,722
16000
15513
   0
               II
 IX
                                                                              4th Quarter Actual
                                                                              3rd Quarter Actual
                                                                              2nd Quarter Actual
                                                                              1st Quarter Actual
                                         12/11/90-15:16
                                            1-17
                              [OSWER 31 FY90]

-------
      OSWER 32: SECTION 106 CIVIL REFERRALS FOR RD/RA W/O SETTLEMENT  Total National Target: 3
                           (FY1990 Performance Against Target)               Total Annual Performance: 4

                                                                       Percent of Target Achieved: 100%
N
u
m
b
e
r

o
f

R
e
f
e
r
r
a
1
s
10
 8
                                                                              4th Quarter Actual

                                                                              3rd Quarter Actual

                                                                              2nd Quarter Actual

                                                                              1st Quarter Actual

                                                                              Annual Target
                II      III
                           IV
V      VI    VII    VIII     IX
Referrals
                                             12/10/90-16:05

                                                1-18
                                                                                           [OSWER 32 FY90]

-------
OSWER 33: SECTION 106 REFERRAL/ORDER FOR RD/RA WITH SETTLEMENT
                      (FY1990 Performance Against Target)                  Total National Target: 80
                                                                    Total Annual Performance: 97
                                                                  Pprrpnt of Target Achieved:  127%
           II
IX
                                                                             4th Quarter Actual
                                                                             3rd Quarter Actual
                                                                             2nd Quarter Actual
                                                                             1st Quarter Actual
                                                                             Annual Target
                                        12/13/90-9:41
                                          1-19
                             [OSWER 33 FY90]

-------
OSWER 34: SITES ISSUED RD/RA UNILATERAL ADMINISTRATIVE ORDERS
                     (FY1990 Performance Against Target)                 Total National Target 37
                                                                  Total Annual Performance: 44
                                                                Percent of Target Achieved: 119%
          II
                                                                          I 4th Quarter Actual
                                                                          3rd Quarter Actual
                                                                          2nd Quarter Actual
                                                                          1st Quarter Actual
                                                                          Annual Target
                                      12/10/90-16:06
                                         1-20
[OSWER 34 FY90]

-------
                              FY90 SCAP/STARS TARGETS AND ACCOMPLISHMENTS SUMMARY REPORT
                                 Annual FY90 Targets and Accomplishments as of September 30,1990
Activities/Region
PA COMPLETIONS
Target
Accomplishment
SSI COMPLETIONS
Target
Accomplishment
RI/FS
Total RI/FS Targets
1st Starts
Total 1st Starts Targets
RP Target
RP Accomplishment
Fund Target
Fund Accomplishment
Subsequent Starts
Total Sub. St. Targets
RP Target
RP Accomplishment
Fund Target
Fund Accomplishment
Completions (FS to Public)
Target
RP Accomplishment
Fund Accomplishment
Completions (RODs)
Total RODs Targets (1)
First ROD (2)
Target
ENF Accomplishment
Fund Accomplishment
Subsequent ROD (2)
Target
ENF Accomplishment
Fund Accomplishment
Final RODs (2)
Target
ENF Accomplishment
Fund Accomplishment
REMEDIAL DESIGNS
Total RDs Targets (3)
1st Starts
Target
RP Accomplishment
Fund Accomplishment
Subsequent Starts
Target
RP Accomplishment
Fund Accomplishment
Final Starts
Target
RP Accomplishment
Fund Accomplishment
REG.1

230
89

130
186

12

9
5
3
4
3

3
2
2
1
4

16
2
6

12

6
0
4

6
2
1

8
2
4

12

7
3
2

5
2
3

7
3
2
REG.2

145
136

220
242

21

14
8
3
6
6

7
0
1
7
9

24
7
16

29

23
10
14

6
1
7

21
5
9

31

22
7
6

9
1
6

18
4
5
REG.3

175
209

ISO
194

18

14
7
9
7
7

4
0
1
4
10

21
6
10

29

17
4
8

12
2
8

13
5
11

19

13
7
6

6
2
4

14
4
3
REG.4

275
278

390
507

20

17
11
17
6
5

3
1
4
2
5

22
14
9

22

21
12
3

1
3
2

14
11
4

20

16
6
3

4
7
2

17
6
3
REG.5

395
201

370
377

19

15
9
11
6
4

4
0
2
4
2

38
11
18

39

27
11
12

12
2
4

24
9
10

35

24
11
7

11
6
2

27
13
5
REG.6

135
129

110
110

10

10
2
2
8
7

0
0
0
0
2

7
3
7

7

6
3
5

1
2
0

5
3
4

5

3
2
0

2
3
1

4
4
1
REG.7

95
102

75
93

8

6
4
5
2
2

2
1
1
1
2

9
9
2

9

7
7
1

2
1
2

5
7
2

7

5
4
2

2
2
1

5
3
1
REG.8

80
85

45
48

5

2
1
1
1
1

3
3
5
0
2

10
3
3

8

7
7
0

1
0
1

3
3
0

4

2
3
0

2
2
1

4
3
0
REG.9

300
313

120
128

11

9
3
5
6
4

2
0
0
2
2

35
4
3

18

10
6
1

8
3
0

9
7
1

15

10
7
2

5
0
1

14
7
1
REG.1 0

90
50

50
21

5

4
3
1
1
1

1
0
1
1
0

5
2
1

4

4
2
1

0
0
0

3
1
1

6

2
1
1

4
4
0

3
1
1
TOTAL

1920
1592

1660
1906

129

100
53
57
47
40

29
7
17
22
38

187
61
75

177

128
62
49

49
16
25

105
53
46

154

104
51
29

50
29
21

113
48
22
A/T%

83%


115%





108%

85%



243%

173%


73%





87%



84%



94%





77%



100%



62%


(1) Total RODs Target includes First RODs and subsequent RODs only
(2) Fund Accomplishment only counts F and S leads.  RP Accomplishment includes FE leads.
(3) Total RDs Targets and Total RAs Targets include First Starts and Subsequent Starts only.
(4) That enforcement data marked with * is from ENFR-3, ENFR-25, ENFR-30, and ENFR-59

Source. FY90 Targets and Accomplishments Report
MGMT-06
 Pull Date 10/19/90
PnnlDate 12/17/90
                                                        1-21

-------
                                     FY90 SCAP/STARS TARGETS AND ACCOMPLISHMENTS SUMMARY REPORT
                                        Annual FY90 Targets and Accomplishments as of September 30,1990
Activities/Region
REMEDIAL ACTIONS
Total RAs Targets (3)
1st Starts
RP Target
RP Accomplishment
Fund Target
Fund Accomplishment
Subsequent Starts
RP Target
RP Accomplishment
Fund Target
Fund Accomplishment
Final Starts
RP Target
RP Accomplishment
Fund Target
Fund Accomplishment
Posl-SARARA Starts
Target
RP Accomplishment
Fund Accomplishment
Final RA Completions
Target
RP Accomplishment
Fund Accomplishment
NPL DELETION INITIATION
Target
Accomplishment
NPL REMOVAL STARTS
Total Targets
RP Target
RP Accomplishment
Fund Target
Fund Accomplishment
NON-NPL REMOVAL STARTS
Total Target
RP Target
RP Accomplishment
Fund Target
Fund Accomplishment
NPL Site Completion Through
Removal Actions
Target
Accomplishment
NPL Site Addressed through
Removal or RI/FS Actions
Target
Accomplishment
NPL Sites where all
Remedial/Removal
implementation Completed
Target
Accomplishment
REG.1

6

5
2
0
2

1
1
0
2

4
2
0
1

3
0
0

0
0
0

0
0

5
1
2
4
• 3

18
5
6
13
20


0
0


16
9



0
0
REG.2

16

8
4
3
B

5
2
0
2

3
1
0
0

6
0
0

4
1
0

1
0

7
1
3
6
16

20
1
6
19
25


0
2


19
16



0
0
REG.3

3

1
1
1
4

1
4
0
1

2
0
0
0

2
0
0

4
0
0

3
1

6
2
4
4
3

35
9
9
26
25


0
0


16
17



0
1
REG.4

9

6
5
0
1

3
4
0
2

7
5
0
2

10
0
0

3
1
0

0
0

7
2
8
5
2

39
8
10
31
35


4
0


23
25



5
0
REG.5

10

9
6
0
0

1
2
0
1

7
3
0
0

2
0
0

3
0
3

3
2

7
1
4
6
6

22
6
11
16
32


2
1


20
20



3
2
REG.6

2

2
1
0
2

0
0
0
1

3
0
0
2

8
0
0

3
0
1

3
0

5
0
1
5
5

12
3
2
9
28


1
4


13
11



4
0
REG.7

3

1
2
0
0

2
2
0
0

3
2
0
0

1
0
0

0
0
0

0
0

2
1
3
1
3

21
6
13
15
17


0
1


9
9



0
0
REG.8

4

1
0
0
1

3
2
0
3

3
1
0
0

1
0
0

0
0
0

0
0

3
1
3
2
3

13
5
4
B
14


0
0


5
6



0
0
REG.9

2

2
2
0
1

0
0
0
1

0
0
0
0

7
0
0

0
0
0

0
0

4
1
3
3
1

13
4
3
9
8


0
0


18
11



0
0
REG.1 0

4

1
0
0
0

3
3
0
1

2
1
0
0

4
0
0

0
0
0

0
0

1
0
2
1
1

12
5
1
7
6


0
0


10
2



0
0
TOTAL

59

36
23
4
19

19
20
0
14

34
15
0
5

44
0
0

17
2
4

10
3

47
10
33
37
43

205
52
65
153
210


7
8


149
126



12
3
A/T%



64%

475%


105%

0%


44%

0%


0%



35%



30%



330%

116%



125%

137%



114%



85%




25%

(1) Total RODs Target includes First RODs and subsequent RODs only
(2) Fund Accomplishment only counts F and S leads RP Accomplishment includes FE leads
(3) Total RDs Targets and Total RAs Targets include First Starts and Subsequent Starts only.
(4) That enforcement data marked with * is from ENFR-3, ENFR-25, ENFR-30, and ENFR-59.

Source: FY90 Targets and Accomplishments Report
MGMT-06
 Pull Dale 10/19/90
Print Date 12/17/90
                                                     1-22

-------
                                     FY90 SCAP/STARS TARGETS AND ACCOMPLISHMENTS SUMMARY REPORT

                                        Annual FY90 Targets and Accomplishments as of September 30,1990
Activities/Region
ENFORCEMENT (4)
RD/RA Negotiation
Start
Target*
Accomplishment*
Completion
Target*
Accomplishment*
107 Cost Recov Rel (>200K)
Removal (Pie-Remedal)
Target*
Accomplishment*
Value*
Remedial
Target*
AccompusninGfil
Value*
Cost Recov (<200K)
Target
Accomplishment
Admin Cost Recovery Settlement
Target
Accomplishment
Total Cost Recov Settlement
Accomplishment*
Cumulative Dollars*
106 RD/RA Referrals
(CDs & UAOs in Compliance)
With Settlement
Target
Accomplishment
Without Settlement
Target
Accomplishment
Other CD Referrals
(RMVL, RI/FS. C.R )
Accomplishment'
UAOs Issued for RD/RA
Target
Accomplishment
UAOs Issued for RMVL,
RI/FS
Accomplishment*
Admin Order Issued
(RI/FS.RMVL.CR)
Accomplishment*
IAG at Fed Facilities
Target
Accomplishment
PRP Search (NPL)
Start
Accomplishment*
Completion
Accomplishment*
REG.1
8
5
13
12
4
3
4.9M
4
4
18.1M
1
0
3
3
21
15.7M
6
10
0
0
1
3
6
5
9
7
3
1
1
REG.2
21
14
23
17
6
B
6SM
1
2
3.4M
1
0
1
6
19
90M
13
16
0
0
0
6
7
3
19
5
6
B
0
REG.3
18
12
21
21
4
7
5.2M
4
4
30 7M
1
0
4
4
22
3.5M
11
13
0
0
0
5
4
11
11
1
5
28
B
REG.4
17
18
14
12
6
5
2.9M
1
1
046M
1
1
8
15
27
61M
12
12
0
0
2
6
6
13
26
6
6
0
2
REG.5
28
16
26
14
13
IB
21 2M
5
3
71M
1
1
1
1
11
68M
12
15
3
3
0
8
12
11
14
5
3
1
0
REG.6
8
6
5
6
2
3
53M
3
3
11 5M
0
0
0
0
B
27M
6
7
0
0
0
1
2
5
4
2
2
20
5
REG.7
8
6
8
10
2
4
3.8M
0
0
0
1
0
0
5
49
12.0M
4
9
0
0
25
1
3
7
15
5
5
1
1
REG.8
6
6
7
8
7
4
1.4M
0
2
40 OM
1
0
2
3
15
12 3M
4
4
0
0
0
0
0
5
11
3
2
4
4
REG.9
17
10
9
12
2
3
24M
1
1
10 OM
1
0
2
4
18
15 5M
8
9
0
0
0
5
4
11
6
12
12
6
11
REG.1 0
6
5
4
3
2
2
35M
2
2
6.1M
1
1
0
0
4
096M
5
2
0
1
0
0
0
3
5
8
10
4
0
TOTAL
137
98
130
115
48
57
57 1M
21
22
1273M
9
3
21
41
194
86.6M
81
97
3
4
28
35
44
74
120
54
54
73
32
A/T%
72%
88%
119%
105%
33%
195%

120%
133%
126%
(1) Total RODs Target includes First RODs and subsequent RODs only
(2) Fund Accomplishment only counts F and S leads. RP Accomplishment includes FE leads
(3) Total RDs Targets and Total RAs Targets include First Starts and Subsequent Starts only.
(4) That enforcement data marked with * is from ENFR-3, ENFR-25, ENFR-30, and ENFR-59.
Source' FY90 Targets and Accomplishments Report
MGMT-06
 Pull Date 10/19/90
Print Date' 12/17/90
                                                      1-23

-------
Section II.  Regional Commitments and Obligations
These reports display the percentage of allocated funds committed
or obligated by Regions for the removal and remedial programs.

       1.  Removal Allowance
       2.  RI/FS Allowance
       3.  Remedial Design Allowance
       4.  Remedial Action Allowance
       5.  Other Response Allowance
                           n-i

-------
                                                 REMOVAL ALLOWANCE

                       FY 90 Commitments/Obligations Through OCTOBER 23,1990 ($ million)
Allowance
Commitments
Obligations
Total C&O
Balance
% C/O*
6.40
0.00
6.28
6.28
0.12
98%
13.46
0.00
13.46
13.46
0.00
100%
15.11
0.00
15.11
15.11
0.00
100%
16.70
0.00
16.44
16.44
0.26
98%
17.01
0.00
16.71
16.71
0.30
98%
13.11
0.00
13.11
13.11
0.00
100%
9.65
0.00
9.47
9.47
0.18
98%
7.15
0.00
7.06
7.06
0.09
99%
5.24
0.00
2.83
2.83
2.41
54%
4.00
0.00
3.95
3.95
0.05
99%
107.83
0.00
104.42
104.42
3.41
97%
             *Percent of allowance committed or obligated.

Source: FY 90 Regional Commitments/Obligations (FMD)
MGMT-14 Chart 2.1
 Pull Date: 10/23/90
Print Date: 10/28/90
                                                              II-2

-------
                                                RI/FS ALLOWANCE

                        FY 90 Commitments/Obligations Through OCTOBER 23,1990 ($ million)
          Regions
10
TOTALS
Allowance
Commitments
Obligations
Total C&O
Balance
%C/O*
11.65
0.00
11.65
11.65
0.00
100%
21.08
0.00
21.08
21.08
0.00
100%
12.22
0.00
12.22
12.22
0.00
100%
7.78
0.00
7.69
7.69
0.09
99%
17.50
0.00
17.27
17.27
0.23
99%
6.75
0.00
5.88
5.88
0.87
87%
4.46
0.00
4.44
4.44
0.02
100%
4.39
0.00
4.36
4.36
0.03
99%
14.96
0.00
14.86
14.86
0.10
99%
3.05
0.00
3.05
3.05
0.00
100%
103.84
0.00
102.50
102.50
1.34
99%
          *Percent of allowance committed or obligated

Source: FY 90 Regional Commitments/Obligations (FMD)
MGMT-14 Chart 2.2
                 Pull Date: 10/23/90
                 Print Date: 10/28/90
                                                              II-3

-------
                                       REMEDIAL DESIGN ALLOWANCE
                      FY 90 Commitments/Obligations Through OCTOBER 23,1990 ($ million)
       Regions
10
TOTALS
Allowance
Commitments
Obligations
Total C&O
Balance
%C/O*
5.47
0.00
5.47
5.47
0.00
100%
14.53
0.00
14.53
14.53
0.00
100%
8.62
0.00
8.62
8.62
0.00
100%
2.18
0.00
1.62
1.62
0.56
74%
8.22
0.00
7.92
7.92
0.30
96%
2.14
0.00
2.12
2.12
0.02
99%
1.15
0.00
1.18
1.18
-0.03
103%
1.44
0.00
1.44
1.44
0.00
100%
2.40
0.00
2.40
2.40
0.00
100%
0.98
0.00
0.98
0.98
0.00
100%
47.13
0.00
46.28
46.28
0.85
98%
     *Percent of allowance committed or obligated

Source: FY 90 Regional Commitments/Obligations (FMD)
MGMT-14 Chan 2.3
                     Pull Date: 10/23/90
                     Print Date: 10/28/90
                                                             II-4

-------
                                        REMEDIAL ACTION ALLOWANCE
                            FY 90 Commitments/Obligations Through OCTOBER 23,1990 ($ million)
             Regions
10
TOTALS
Allowance
Commitments
Obligations
Total C&O
Balance
%C/0*
100.26
0.00
99.75
99.75
0.51
99%
127.28
0.00
126.19
126.19
1.09
99%
28.69
0.00
28.69
28.69
0.00
100%
24.09
0.00
24.09
24.09
0.00
100%
13.67
0.00
13.44
13.44
0.23
98%
30.74
0.00
30.74
30.74
0.00
100%
0.00
0.00
0.00
0.00
0.00
0%
37.46
0.00
37.45
32.03
5.43
86%
5.64
0.00
5.64
5.64
0.00
100%
7.06
0.00
7.06
7.06
0.00
100%
374.89
0.00
373.05
367.63
7.26
98%
            *Percent of allowance committed or obligated

Source: FY 90 Regional Commitments/Obligations (FMD)
MGMT-14 Chart 2.4
             Pull Date: 10/23/90
            Print Date: 10/28/90
                                                              II-5

-------
                                               OTHER RESPONSE ALLOWANCE**

                              FY 90 Commitments/Obligations Through OCTOBER 23,1990 ($ million)
                Regions
8
10
              *Percent of allowance committed or obligated
              **Thc Other Response Allowance includes intramural funds used for "Other Contractual Services" and "ADP Contract Services"
Source: FY 90 Regional Commitments/Obligations (FMD)
MGMT-14 Chart 2.5
TOTALS
Allowance
Commitments
Obligations
Total C&O
Balance
% C/O*
100.26
0.00
99.75
99.75
0.51
99%
127.28
0.00
126.19
126.19
1.09
99%
28.69
0.00
28.69
28.69
0.00
100%
24.09
0.00
24.09
24.09
0.00
100%
13.67
0.00
13.44
13.44
0.23
98%
30.74
0.00
30.74
30.74
0.00
100%
0.00
0.00
0.00
0.00
0.00
0%
37.46
0.00
37.45
37.45
0.01
100%
5.64
0.00
5.64
5.64
0.00
100%
7.06
0.00
7.06
7.06
0.00
100%
374.89
0.00
373.05
373.05
1.84
100%
                               Pull Date: 10/23/90
                              Print Date: 10/28/90
                                                                  II-6

-------
Section III.   A National  Perspective of the Superfund
                                    Program
          1.  Site Data                                          SITE
             •  Inventory Assessment                                  JJ ^|
             •  Current NPL Site Activity                                m&^
             •  Work Begun at NPL Sites                                MT?
             •  Pipeline Progress of Superfund Sites
             •  Increasing Activity at Superfund Sites
             •  Removal Activity at Superfund Sites
             •  Numbers Matrix
             •  Site Inventory and Progress Towards SARA Targets
             •  Completion and Deletion Status of NPL Priority Sites
             •  Superfund Site Completions and Deletions from the NPL


          2.  Enforcement Data                                ENFORCEMENT
             •  Value of PRP Response Settlements
             •  Cost Recovery Referrals to HQ/DOJ (>$200.000)
             •  Settlement for Cost Recovery
             •  Responsible Party Involvement
             •  Cumulative Cost Recovery Collections
                                         m-i

-------
Section III.  A National Perspective of the Superfund
                           Program (Cont'd.)
         3.   Budget Data                                      BUDGET
            • FY 90 Superfund Appropriation
            • Superfund FY 90 Response Funding
              FY 91 Superfund Budget
            • FY 91 Superfund Response Budget
            • Superfund Obligation History & Funding Requirements by Fiscal
              Year
            • FTE Summary


         4.  Project Data                                     PROJECT
            • Pipeline Progress of Superfund Projects                     W*\]
            • Remedial Program Project Accomplishments                  n&n
            • Ongoing NPL Work                                   n TA
            • Superfund Removal Actions
            • Removal Action Starts by Fiscal Year
            • Removal Action Starts — Fund Lead
            • Emergency Response Division FY 87-90 Fund and RP Lead Starts
              and Completions
                                                                                    SITE
                                                                                   •V1
                                                                                   •T4
                                                                                    DATA
                                       ra-2

-------
Section III.  1 Site Data
   Inventory Assessment
   This pie graph shows Pre-Remedial Program work in assessing sites
   that have been entered into the site inventory, indicating percentages
   that await assessment, that need no further response action, and that
   are on the National Priorities List (NPL).

   Current NPL Site Activity
   This bar graph focuses on the number of sites which have had con-
   struction activity, either removal or remedial action.
DATA
   Work Begun at NPL Sites
   This pie graph shows the number of NPL sites at each stage of remedial work from evalu-
   ation through study, remedy selection, design, and construction to completed construction.

   Pipeline Progress of Superfund Sites
   This graph indicates the number of sites which have progressed through the pipeline of re-
   medial work and also indicates the portion done by the Federal  Government with respect to
   the portion done by private parties.

   Increasing Activity at Superfund Sites
   This bar chart shows the difference in the number of sites that have had removal and reme-
   dial work after SARA as opposed to before SARA.
                                       ra-3

-------
Section III.  1 Site Data (Cont'd.)
   Removal Activity at Superfund Sites
   This pie graph shows the distribution of NPL sites as opposed to non-
   NPL sites that have had removal and further differentiates three catego-
   ries of Lead: Fund, PRP, or Other leads

   Superfund Numbers Matrix                                     _^
   This report displays accomplishment totals over three time periods:        D A, I A,
   since program inception, post-SARA, and pre-SARA. It identifies both
   the number of sites and the total number of events.

   Site Inventory and Progress Towards SARA Targets
   This report lists the number of sites in CERCLIS and the number of sites reaching SARA Site
   Assessment Program targets.

   Completion and Deletion Status of NPL Priority Sites
   This report provides details of the thermometer graph listing the sites that have been deleted
   from the National Priorities List, sites noticed for deletion, sites with completed close out re-
   ports awaiting publication of deletion notice, Long Term Response Actions, and sites with
   completed Final Action but close out report not final.

   Superfund Site Completions and Deletions from the NPL
   This thermometer graph shows the proportion of completed sites that have been deleted or
   that are at various stages of completion.
                                       m-4

-------
     Most [Sites | in  Super fund Inventory
                 Have Been Assessed
CERCLIS INVENTORY: 33,575
           Site Inspection Complete
           5,953-18%
      No Further Action
      (Site Inspection Complete)
      5,791-17%
            NPL including
            Deleted Sites
            1,236-4%
                                        Awaiting Assessment
                                        2,563-8%
Source: PC CERCLIS
MGMT-15 Chart-3.1.1
Awaiting Site Inspection
4,534-14%
                                    No Further Action
                                    (Preliminary Assessment Complete)
                                    13,498-40%
                                         Pull Date: 10/19/90
                                         Print Date: 10/22/90
 SITE

K
 DATA
                                 m-5

-------
 Nearly Half of the Current NPL Sites
        Have Construction Activity
 Study Pending or Under Way
    Emergency Action Only
     Emergency Action and
    Long Term Construction
Long Term Construction Only
                      1,236
                        671
423 Sites with
  Emergency
  Actions
308 Sites with
  Long Term
  Constructior
*565 Sites Have
   Construction
   Activity
Chart-3.1.2
                                                    SITE
       Pull Date: 10/19/90
       Print Date: 11/07/90
                                                    DATA
                          m-6

-------
        Work  Has  Begun at  Most NPL [Sites
NPL Proposed
NPL Final
 Subtotal
NPL Deletions
Total
                              Construction Completed 63
              Construction Underway 272
               Design Underway 150
  20
1187
1207
  29
1236
Remedy Selected 113
                                  Evaluation for Immediate Threat Complete -
                                  Action Not Begun (Proposed Sites) 8
                                           Evaluation for Immediate Threat Complete •
                                           Action Not Begun (FinalSites) 110
                                               Removal Only 15
Note: Segments are cumulative. (Sites with construction under way have already completed
    Study, Remedy Selection, and Design.)
                                               m-7
                                           Study Underway 505
                                                             Pull Date: 10/19/90
                                                             Print Date: 12/11/90
                                                             Chart-3.1.3
                                                                                              SITE
                                                                               DATA

-------
    PIPELINE  PROGRESS  OF  SUPERFUND  BITES
   Number of Sites with Studies (Remedial
   Investigation/Feasibility Study) Started
   Number of Sites with Remedies
   Selected*
   Number of Sites with Remedial
   Designs Started


   Number of Sites with Construction
   (Remedial Actions) Started
   Number of NPL Sites with Removals
   Started
   Number of Sites with Remedial Action
   Projects Completed**
   Total Construction Work at Site
   Completed
                                     200
400
600
800
1.000  ^4.200
1,400
                                             Key

                                    Shaded circles mark the progress as
                                    of the end of FY 89. Circle graphs
                                    show progress as of September 30,
                                    1990. The white segment ot each
                                    graph shows the portion done by the
                                    Superfund; the striped segment shows
                                    the Federal Facility and other leads
                                    portion; the black segment shows the
                                    portion done by private parties.
                            0        200      400       600      800      1,000     1,200

                                Number of Sites at Each Stage
* All Records of Decision are Federal Responsibility
** Refers to completion of a project at a site. Any site may require completion of more than one project before construction at the site is complete.
Note: "Fund leads" include F, S, FE, SE, EP, and CG.
    "RP leads" include RP, MR, and PS.
    "Federal Facility and Other leads" include FF, SN, SR.
                                                1,400
Chart-3.1.4
                                        Pull Date: 10/19/90
                                       Print Date: 12/11/90
                                                        SITE
                                                                                                      DATA
                                                   m-8

-------
INCREASING ACTIVITY AT  SUPERFUND I SITES
        RI/FS
                 RODs
Note: Remedial Program data is NPL, Removal for both NPL and Non-NPL sites.
Data as of: 10/19/90
Print Date: 10/31/90
Chart-3.1.5
                                             Post-SARA

                                             Pre-SARA
                                                         SITE
                                                        DATA
                           m-9

-------
      Removal Activity at Superfund[Sites
NPL =      421
Non NPL =   1507
TOTAL=     1928
                        (Since Inception)

                          NPL Other 6
                                i;  Non-NPL Other 0
                 NPLPRP139
                 Non-NPL PRP
Fund1217
                                                     I  I Fund

                                                     mm Other Leads
Note:  "Fund leads" include: F.S.FE.SE, EP,CG.
    "PRP leads" include: RP, MR, PS.
    "Other leads" include: FF, SN, SR

Chart-3.1.6
        Pull Date: 10/19/90
        Print Date: 10/29/90
                     SITE
                                                                  DATA
                                m-io

-------
                                             NUMBERS MATRIX
                                         (Since Inception, By Lead)
Other Rspn
Measure Fund State Fund Party
RI/FS First Starts (# of Sites) 350 150 104 247
RI/FS Subsequent Starts 204 66 39 100
RD First Starts (# of Sites) 171 51 5 179
RD Subsequent Starts 98 28 1 80
RA First Starts (# of Sites) 115 42 0 113
RA Subsequent Starts 55 23 0 31
NPL Removal First Starts (# of Sites) 268 1 7 138
NPL Removal Subsequent Starts 207 1 1 73
Non-NPL Removal First Starts (# of Sites) 1089 2 126 288
Non-NPL Removal Subsequent Starts 85 0 1 72
First RODs 269 65 216 0
Subsequent RODs 115 11 47 0
RD First Completions (# of Sites) 106 35 1 103
RD Subsequent Completions 34 13 1 21
NPL First Removal Completions (# of Sites) 235 1 7 107
NPL Subsequent Removal Completions 171 1 0 43
Non-NPL First Removal Completions (# of Sites) 910 2 114 209
Non-NPL Subsequent Removal Completions 60 0 0 44
RA First Completions (# of Sites) 49 18 0 51
RA Subsequent Completions 11 9 0 5
Completed Sites (All Cleanup Activity Completed) 40 6 3 11
NPL Deletions
Note: "Other Fund" includes: FE = Fund Enforcement, SE = State Enforcement, EP = EPA in
Other Maj Lead Fed Other
RP Subtotal Fac Leads Total
89 940 87 48 1075
9 418 156 7 581
17 423 8 16 447
11 218 25 2 245
16 286 6 16 308
5 114 12 4 130
1 415 4 2 421
1 283 5 1 289
2 1507 0 0 1507
0 158 0 0 158
0 550 12 6 568
0 173 11 1 185
9 254 5 13 272
1 70 10 2 82
1 351 3 1 355
1 216 1 0 217
2 1237 0 1 1238
0 104 0 0 104
6 124 3 8 135
2 27 7 2 36
2 62 0 1 63
29
House, CG = Coast Guard.
"Other RP" includes: MR = Mixed Funding, PS = PRP Response Under State Order w/Fundmg
"Other Leads" : SN = State/No Fund Money, SR = PRP Response Under State Order

bource:
MGMT-11
 Pull date:
Print date:
10/19/90
  1/3/91
                                                   m-ii

-------
                                            NUMBERS MATRIX
                                          (Post-SARA, By Lead)
Other Rspn
Measure Fund State Fund Party
RI/FS First Starts (# of Sites) 145 31 27 174
RI/FS Subsequent Starts 140 25 21 65
RD First Starts (# of Sites) 124 30 5 144
RD Subsequent Starts 90 20 1 78
RA First Starts (# of Sites) 93 23 0 95
RA Subsequent Starts 52 17 0 29
NPL Removal First Starts (# of Sites) 82 0 1 74
NPL Removal Subsequent Starts 116 0 1 54
Non-NPL Removal First Starts (# of Sites) 645 0 76 204
Non-NPL Removal Subsequent Starts 55 0 1 63
First RODs 162 27 188 0
Subsequent RODs 90 10 45 0
RD First Completions (# of Sites) 87 23 1 86
RD Subsequent Completions 33 10 1 20
NPL First Removal Completions (# of Sites) 70 1 1 62
NPL Subsequent Removal Completions 93 0 0 26
Non-NPL First Removal Completions (# of Sites) 528 1 65 161
Non-NPL Subsequent Removal Completions 40 0 0 39
RA First Completions (# of Sites) 41 7 0 39
RA Subsequent Completions 9703
Completed Sites (All Cleanup Activity Completed) 26 2 3 6
NPL Deletions
Note: 'Other Fund" includes: FE = Fund Enforcement. SE = State Enforcement, EP = EPA in
Other MajLead Fed Other
RP Subtotal Fac Leads Total
66 443 80 17 540
6 257 150 4 411
16 319 8 6 333
9 198 25 2 225
15 226 6 8 240
5 103 12 4 119
0 157 3 1 161
0 171 4 1 176
2 927 0 0 927
0 119 0 0 119
0 377 11 4 392
0 145 11 0 156
7 204 5 7 216
1 65 10 2 77
0 134 3 1 138
1 120 1 0 121
2 757 0 1 758
0 79 0 0 79
5 92 3 4 99
2 21 7 2 30
1 38 0 0 38
16
House, CG = Coast Guard.
"Other RP" includes: MR = Mixed Funding. PS = PRP Response Under State Order w/Funding
"Other Leads" : SN = State/No Fund Money. SR = PRP Response Under State Order

Source: PC-CERCLIS
MGMT-11
 Pull date:
Print date:
10/19/90
  1/3/91
                                                   in-iz

-------
                                            NUMBERS MATRIX
                                           (Pre-SARA, By Lead)
Other Rspn
Measure Fund State Fund Party
RI/FS First Starts (# of Sites) 205 119 77 73
RI/FS Subsequent Starts 64 41 18 35
RD First Starts (# of Sites) 47 21 0 35
RD Subsequent Starts 8802
RA First Starts (# of Sites) 22 19 0 18
RA Subsequent Starts 3602
NPL Removal First Starts (# of Sites) 186 1 6 64
NPL Removal Subsequent Starts 91 1 0 19
Non-NPL Removal First Starts (# of Sites) 444 2 50 84
Non-NPL Removal Subsequent Starts 30 0 0 9
First RODs 107 38 28 0
Subsequent RODs 25 1 2 0
RD First Completions (# of Sites) 19 12 0 17
RD Subsequent Completions 1301
NPL First Removal Completions (# of Sites) 165 0 6 45
NPL Subsequent Removal Completions 78 1 0 17
Non-NPL First Removal Completions (# of Sites) 382 1 49 48
Non-NPL Subsequent Removal Completions 20 0 0 5
RA First Completions (# of Sites) 8 11 0 12
RA Subsequent Completions 2202
Completed Sites (All Cleanup Activity Completed) 14 4 0 5
NPL Deletions
Note: "Other Fund" includes: FE = Fund Enforcement, SE = State Enforcement, EP = EPA in
Other MajLead Fed Other
RP Subtotal Fac Leads Total
23 497 7 31 535
3 161 63 170
1 104 0 10 114
2 20 0 0 20
1 60 0 8 68
0 11 0 0 11
1 258 1 1 260
1 112 1 0 113
0 580 0 0 580
0 39 0 0 39
0 173 1 2 176
0 28 0 1 29
2 50 0 6 56
05005
1 217 0 0 217
0 96 0 0 96
0 480 0 0 480
0 25 0 0 25
1 32 0 4 36
06006
1 24 0 1 25
13
House, CG = Coast Guard.
"Other RP" includes: MR ° Mixed Funding, PS ° PRP Response Under State Order w/Funding
"Other Leads" : SN = State/No Fund Money, SR = PRP Response Under State Order

Source: PC-CERCLIS
MGMT-11
 Pull date:
Print date:
10/19/90
  1/3/91
                                            in-13

-------
Si
Soun
Char
ite Inventory and Progress Towards SARA Targets
As of September 30, 1990
NUMBER OF SITES
PERCENT OF TOTAL SITES
NUMBER OF PROPOSED NPL SITES
NUMBER OF FINAL NPL SITES
NON-FEDERAL SITES
NUMBER OF NON- FEDERAL SITES
PERCENT OF TOTAL NON-FEDERAL SITES
NUMBER OF PA SITES
NUMBER OF NON-PA SITES
NUMBER OF NFRAP PA SITES
NFRAP PERCENT OF NON- FEDERAL PA SITES
NUMBER OF SI SITES
NUMBER OF NFRAP SI SITES
NFRAP PERCENT OF NON-FEDERAL SI SITES
FEDERAL SITES
NUMBER OF FEDERAL SITES
PERCENT OF TOTAL FEDERAL SITES
NUMBER OF PA/SI SITES
NUMBER OF NON -PA/SI SITES
NUMBER OF NFRAP PA/SI SITES
NFRAP PERCENT OF PA/SI FEDERAL SITES
:e: PRMD01
L-3.1.8
REGION
1
2,120
6.31
0
84
2,012
6.26
1.850
162
635
34.32
681
160
23.49
108
8.04
125
17
50
40.00

REGION
2
3,314
9.87
0
201
3,206
9.95
2,979
227
988
33.17
1.389
77
5.54
108
8.04
107
1
28
26.17

REGION
3
4,127
12.29
1
149
3,984
12.36
3.633
351
2,314
63.69
1,212
82
6.77
143
10.65
128
15
37
28.91

REGION
4
5,210
15.52
0
154
5.034
15.62
4.756
278
1,299
27.31
2,517
444
17.64
176
13.10
208
32
37
17.79

REGION
5
6,273
18.68
1
263
6.212
19.27
5,920
292
3.268
55.20
2.281
369
16.18
61
4.54
78
17
30
38.46

REGION REGION
6 7
4.291 2.297
12.78 6.84
1 3
69 59
4,172 2,212
12.94 6.86
3.958 2.112
214 100
3,174 1,088
80.19 51.52
2,056 884
1,469 38
71.45 4.30
119 85
8.86 6.33
156 74
37 11
55 11
35.26 14.86

REGION REGION
8 9
1,044 3.516
3.11 10.47
5 9
41 99
981 3.263
3.04 10.12
920 2.843
61 420
705 2.220
76.63 78.09
313 748
195 363
62.30 48.53
63 253
4.69 18.84
61 180
2 73
29 23
47.54 12.78
Pull Date:
Print Date:
REGION
10
1,383
4.12
0
68
1.156
3.59
1.054
102
671
63.66
579
276
47.67
227
16.90
93
134
22
23.66
10/19/90
10/31/90
TOTALS
33,575
100.00
20
1,187
32,232
100.00
30,025
2,207
16,362
54.49
12,660
3,473
27.43
1.343
100.00
1,210
133
322
26.61

SITE
K
DATA
m-i4

-------
/W\ Completion and Deletion Status
\$S&J of National Priorities List Sites


DELETED SITES:
Chemical Metals, MD
Chemical Minerals, OH
Cecil Lindsay, AR
Cooper Road, NJ
Enterprise Avenue, PA
Friedman Property, NJ
Gratiot County Golf Course, MI
Harris (Farley Street), TX
Krysowaty Farm, NJ
Lehigh Electric and Engineering Co., PA
Luminous Processes, GA
Matthews Electroplating, VA
Middletown Road Dump, MD
Mountain View Mobile Home Estates, AZ
Morris Arsenic Dump, MN
New Castle Steel, DE
Parramore Surplus, FL
PCB Spills, NC
PCB Warehouse, Saipan, Mariana Islands
Presque Isle, PA
Reeser's Landfill, PA
Taputimu Farm, American Samoa
Tofidahl Drums, WA
Tri-City Oil Conservationist, FL
Trust Territories PCB's
Varsol Spills, FL
Voortman Farm, PA
Wade (ABM), PA
Walcott Chemical, MS
Source: HSCD
MGMT-12 September 30, 1990
Close Out
Report Date

N/A
N/A
03/28/89
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
03/29/88
N/A
N/A
N/A
08/17/88
11/04/88
N/A
N/A
03/08/88
03/05/90
N/A
N/A
N/A
N/A
N/A
03/24/89
06/29/88
N/A
Deletion CERCLIS
Date Status

12/30/82 /
12/30/82 /
09/22/89 /
02/22/89 /
03/07/86 /
03/07/86 /
09/08/83 /
04/18/88 /
02/22/89 /
03/07/86 /
12/30/82 /
01/19/89 /
04/18/88 /
04/18/88 /
03/07/86 /
03/17/89 /
02/21/89 /
03/07/86 /
03/07/86 /
02/13/89 /
05/31/90 /
03/07/86 /
12/23/88 /
09/01/88 /
03/07/86 /
09/01/88 /
05/31/89 /
03/23/89 /
12/30/82 /
Pull Date: 10/19/90
• Office of Emergency and Remedial Response Print Date: 10/19/90
ffl-15

-------
          Completion and Deletion Status of NPL Site • Page 2
                                  Close Out
                                  Report Date
                               Intent
                               To Delete
CERCLIS
Status
SITE NOTICED FOR DELETION:
A.L. Taylor (Valley of the Drums), KY
Galloway Pits, TN
IMC (Terre HouteV IN
Jiboom Junkyard, CA
Lee's Lane Landfill, KY
Mowbray Engineering Co., AL
Newport Dump, KY
Peterson Sand & Gravel. IL
POT Farm. TN
Taylor Borough Dump.PA
Whitehall Municipal Wells, MI
03/10/88
03/31/88

03/31/88
03/18/88
08/20/87
03/22/88
09/12/89
08/18/89
10/04/89
09/07/90
07/11/88 /
05/16/88 /
09/22/89 /
05/24/89 /
05/16/88 /
08/05/88 /
05/16/88 /
09/22/89 /
09/21/89 /
/
09/21/90 /
COMPLETED SITES PENDING DELETION NOTICE:
Big River Sand, KS
Brown Wood Preserving, FL
Celior Chemical Works, CA
Charlevoix Municipal Well Field, MI
FMC Corp, MN
Frit Industries, AR
GE - Moreau Site, IA
Independent Nail Co., SC
LaBounty Site, IA
Mercury Refining, Inc., NY
Northern Engraving Co, WI
Rose Park Sludge Pit, UT
Tar Creek (Ottawa County), OK
TRW Inc Minerva PLT, OH
Westline Site, PA
LONG TERM RESPONSE ACTIONS:
Alpha Chemical Corp, FL
Chem-Dyne, OH
Mid-South Wood Products, AR
Oakdale Dump Sites, MN
Old Mill, OH
09/30/88
04/07/89
09/29/89
08/22/89
12/15/87
01/25/85
01/02/90
09/13/88
12/30/88
01/02/86
09/29/89
09/23/85
12/31/86
12/31/86
02/01/89

08/28/90

09/29/89


pending Deletion Initiation*

pending /
pending S



pending /
pending /

pending /










Source: HSCD
MGMT-12
September 30,1990 • Office of Emergency and Remedial Response
                m-i6
  Pull Date: 10/19/90
  Print Date: 10/19/90

-------
           Completion and Deletion Status of NPL Site •  Page 3
REMEDIATION COMPLETE PENDING CLOSE OUT REPORT APPROVAL:

Beachwood/Berkely Wells, NJ (No Action ROD date = 06/30/88, draft Close Out report date = 03/13/90)
Ordot Landfill, GU
NL Ind Taracorp Golden Auto, MN
SUMMARY:


     Deleted Sites:                                  29

     Sites Noticed for Deletion:                        11

     Completed Sites Pending Deletion Notice:             IS
     TOTAL COMPLETIONS:                       55
     Long Term Response Actions

     Remediation Complete Pending
        Close Out Approval

     TOTAL COMPLETIONS, LTRAs,
        AND COMPLETED ACTIONS:                63
KEY:
 N/A      Site was completed prior to initiation of Close Out Reports.
  /      CERCLIS is up to date.
  *       CERCLIS requires updating.
  t       Notice of Intent to Delete only.
Underline   No action ROD was the remedy.
Source: HSCD                                                          Pull Date: 10/19/90
MGMT-12             September 30,1990 • Office of Emergency and Remedial Response     Print Date: 10/19/90

                                    IH-17

-------
     SUPERFUND SITE COMPLETIONS AND DELETIONS
                  From the National Priorities List
                                                Sites with completed final action
                                                but close out report not final


                                                Long term response actions
 Sites Targeted for
   Deletion Initiation
 Sites Targeted for
   final RA completion
FY90
Target

  10

  17
                                    15
                                                Sites with completed close out
                                                reports awaiting publication of
                                                deletion notice
                                               Sites noticed for deletion
                                                Deleted Sites
Source: Completion and Deletion Status of the National Priorities List Sites/(HSCD)  Pull Date: 10/19/90
MGMT- 01P Chart-3.1.9                                       Printed: 12/11/90
                                                                       SITE
                                                DATA
                                   rn-is

-------
Section III.  2 Enforcement

                 Data


•  Value of PRP Response Settlements
   This bar graph shows how the proportion of
   RD/RA settlements has increased with re-
   spect to other response settlements over the
   past three years.
                                       ENFORCEMENT
                                                   DATA
Cost Recovery Referrals to HQ/DOJ
(>$200,OOO)
This bar graph shows how the number and
dollar value of cost recovery referrals to Headquarters/Department of Justice has changed
over the past three years.

Settlements for Cost Recovery
This bar graph shows how the number and dollar values of cost recovery has changed over
the past three years.

Responsible Party Involvement
This series of pie charts shows how RP involvement has increased over the past three years.

Cumulative Cost Recovery Collections
This bar graph shows cumulative cost recovery from FY87 to FY90.
                                   m-i9

-------
      Value  of PRP Response  Settlements
                             (All Activities)
                 FY87
FY88
FY89
                                                   1,312*
                       Other Response
                       Settlement Dollars
FY90
          I Number of Settlements j 23:-;
 221
272
 285
Source: CERCLIS
Chart 3.2.1
                                 HI-20
                                                                ENFORCEMENT
                         Cutoff Date: 10/19/90  	
                          Print Date: 1/04/90  DATA

-------
     Cost Recovery Referrals to HQ/DOJ (>$200,000)
       200
   Number of Projects   30
Source: CERCLIS
Chart 3.2.2
                            88           89
                             Fiscal Year
59
                         90
79
                                                                   ENFORCEMENT
                            Pull Date: 10/19/90
                            Print Date: 1/04/90
                                   m-2i

-------
            Settlement for Cost Recovery ( All Activity)**
          Except lAGs at Federal Facilities
                                 88              89
                                    Fiscal Year
                              90
     Number of Projects   68
163
142
193
Source: CERCLIS
Chart 3.2.3
                                                                              ENFORCEMENT
                                Pull Date: 10/19/90   _
                               Print Date: 12/07/90   'DATA
                                         m-22

-------
 Responsible Party Involvement - First  and Subsequent Starts

                    Pre-SARA     FY87 POSI-SARA       FY88          FY89           FY90
     movalx"
 Fund 811
  RP 178
Fed Fac   2
 Other
               Fund  524
                RP
              Fed Fac
               Other   34
               Fund   84
                RP   40
              Fed Fac   0
               Other   10
 Remedial Design
               Fund  50
                RP  21
              Fed Fac   0
               Other   8
Remedial Action
Source:
Chart 3.2.4
                          Fund
                    RP
Fed Fac
Other
                                                                                ENFORCEMENT
                                                      Pull Date: 10/19/90
                                                       Print Date: 1/04/90
                                         DATA
                                         m-23

-------
300
                 CUMULATIVE COST RECOVERY COLLECTIONS ($ MUlions)
                                    12/1 (₯90-16:15
                                      m-24
                                                                        FY1990
                                                                                         ENFORCEMENT
         DATA

[VAL CR COLL CHART]

-------
Section III.  3 Budget Data
                                                          BUDGET
                                                             DATA
 FY 90 Superfund Appropriation
 This pie chart shows the distribution of the entire FY90 Superfund Ap-
 propriation which supports Response, Air/Water, R&D, Management/
 Support. Inter-Agency, and Enforcement.

 Superfund FY 9O Response Funding
 This pie chart shows the distribution of the FY90 Response Budget over
 Fund-RA, Fund-RD. Salaries. Pre-Remedial, RI/FS, Response Support,
 and Removal.

 FY 91 Superfund Budget
 This pie chart shows the distribution of the entire FY91 Superfund Ap-
 propriation over Response and other budgets.

 FY 91 Superfund Response Budget
 This pie chart shows the distribution of the FY91 Response Budget.

 EPA Superfund Obligation History and Funding Requirements by Fiscal
 Year
 This table shows how total Superfund Obligations and Funding have increased over the last three years
 and over FY90 and FY91.

 FTE Summary
This table shows how FTE needs have increased from FY89 through planned FY91.
                                     m-25

-------
                    FY 90 Superfund Appropriation
                                      AIR/WATER —$5.3
                             R&D —$77.9
                                                     CASH OUTS —$2.5
        MANAGEMENT & SUPPORT —$127.3
          • OARM
          • OGC
        INTERAGENCY —$125.7
     ENFORCEMENT — $158.5
                              FY 90 Budget — $1,617.5 Million
                               Includes $2.5 Million for Reimbursable Accounts
                                                                      RESPONSE —$1,1202
                                                                      • Pre-Remedial
                                                                        • RI/FS
                                                                        • RD/RA
                                                                        • Removal
                                                                        • Support
                                                                                   BUDGET
Chart 3.3.1 Print Date: 01/04/90
                                                                                    DATA
                                          IE-26

-------
              Superfund FY 90 Response Funding
                              FUND RD —$46.3
                     SALARIES —$67.3
          PRE-REMEDIAL — $77.8
            RI/FS —$102.5
         RESPONSE SUPPORT —
         $119.0
          • Lab Analysis
          • Contract Infrastructure
Chart 3.3.2 Print Date: 12/27/90
                                 REMEDIAL SUPPORT -
                                 $154.3
                                   • Contractor Mgmt.
                                   • TAG and Corps
                                    Grants
                                   • RP-RD/RA
                                    Oversight
                                                             FUND RA —$373.1
REMOVAL —$179.9
 • ERT
 • Actions
 • Support
  FY 90 Budget —
  $1,120.2 Million
                      BUDGET
                                                                                   DATA
                                          m-27

-------
                       FY 91  Superfund Budget
                                          AIR/WATER — $8.6
      MANAGEMENT& SUPPORT —$122
        •  OARM
        •  OGC              J<£  6.3%
        •  OIG

        INTERAGENCY —$110.1
   ENFORCEMENT — $181.8
Data as of June 30,1990
Chart 3.3.3 Print Date: 01/04/90
Total Budget — $1,753.1 Million
                                                                  Note: The Response Budget is nearly
                                                                  75% of the total budget.
                                                                   RESPONSE — $1,258.8
                                                                     • Pre-Remedial
                                                                     • RI/FS
                                                                     • RD/RA
                                                                     • Removal
                                                                     • Support
                                                                                  BUDGET
Bn
DATA
                                         m-28

-------
                    FY 91 Superfund Response Budget
                                          RI/FS —$55.7
                         FUND RD —$68.6
              PRE-REMEDIAL — $76.6
             SALARIES —$77.6
          REMOVAL Support —
          $80.7
            REMOVAL Actions— ^
            $104.5
                  RESPONSE SUPPORT —
                  $138.2
                    • Lab Analysis
                    • ERT
                    • Contract Infrastructure
                                                                    FUND RA —$518.5
                                                                     FY 91 Budget —
                                                                     $1,258.8 Million
Data as of June 30.1990
Chart 3.3.4 Print Date: 08/17flO
REMEDIAL SUPPORT —
$138.4
  • Contractor Mgmt.
  • TAG and Corps
   Grants
  • RP-RD/RA
   Oversight
BUDGET
                                   DATA
                                            m-29

-------
Superfund Obligation History & Funding Requirements
by Fiscal Year (Dollars in Millions)
Program Area
Direct Site Activity
• Direct Site Work
-- Removal Actions
"Pre-Remedial
-Eng. & Design
-Remedial Actions
-Other
•Direct Site Support
Indirect Site Work
Program Support
Total Superfund
Pre-SARA
Total
1.226.1
786.5
135.4
76.1
368.0
207.0

439.6
91.9
254.4
1,806.1
1987 Actual
738.0
534.9
115.9
33.6
184.6
194.6
6.2
203.1
58.3
254.4
1.050.7
1988 Actual
1,085.7
849.1
101.7
42.8
211.7
492.9

236.6
79.8
331.9
1.497.4
1989 Actual
1,062.0
751.3
116.7
45.5
185.9
403.2

310.7
97.6
384.1
1,543.7
1990
Oper.
Plan
1,001.1
679.2
111.9
57.6
201.6
308.1

321.9
113.4
425.8
1.540.3
1991
Pres.
Budg.
1,216.6
862.5
111.2
45.3
172.4
533.6

354.1
116.8
419.7
1,753.1
Source: U.S. EPA Superfund Budget Documents
Chart 3.3.5
Post-SARA
Total
5.103.4
3.677.0
557.4
224.8
956.2
1.932.4
6.2
1,426.4
465.9
1.815.9
7,385.2
Pull Date:
Print Date:
Post-SARA
Percentage
69
50
8
3
13
26
0
19
6
25











100
RIIDftFT
1
ncjoQ/on 53^
1
uo/to/yu TT»VA
01/04/90 °ATA
m-30

-------









FTESun
Category
Response
Remedial
HQ
Region
Removal
HQ
Region
Response Support
HQ
Region
Enforcement
Technical
HQ
Region
Legal
Research & Development
Management Support
Air & Water
Total

Source: Superfund Budget Documents
Chan -3.3.5
unary
FT89
71
525
51
95
120
284
93
568
326
103
521
42
2,799


Number
FY90 FY91
74
643
46
95
120
316
93
869
483
130
621
45
3,535 3,

Pull Date:
Print Date:
73
661
45
105
122
288
93
870
483
130
638
45
553








BUDGET
Ryiss
gp«^jj
06/30/90 LMl
01/04/90 DATA
ra-si

-------
Section III. 4 Project Data
                                                        PROJECT
                                                              DATA
Pipeline Progress of Projects at Superfund sites
This graph indicates the number of projects at each stage of
the pipeline of remedial work and also indicates the portion
done by the Federal Government with respect to the portion
done by private parties.

Remedial Program Project Accomplisments (Post
SARA)
This bar chart indicates the change in the number of projects
at each stage of the pipeline over the past three years.

Ongoing NPL Work
This table shows the change in the lead involvement in pipeline projects over the past three
years*

Superfund Removal Actions
This pie graph shows the distribution of removal projects, differentiating projects at NPL
sites from projects at non-NPL sites and further differentiating three categories of project
lead: Fund, PRP, or Other Leads.

Removal Action Starts and Completions by Fiscal Year
This bar chart shows how removal starts and completions have changed over the past three
years with respect to projects at NPL or non-NPL sites and with respect to Fund or RP
Lead.
                                      in-32

-------
      PIPELINE  PROGRESS OF  SUPERFUND  PROJECTS
Remedial Investigations
and Feasibility Studies
Started

Records of Decision
Signed*

Remedial Designs
Started
Remedial Actions Started


NPL Removals Started


Remedial Action Projects
Completed


Sites Completed
                                   200
400
600
800
1,000     1,200
1,400
                                                  1,656
                                        Key

                                Shaded circles mark the progress as
                                of the end of FY 89. Circle graphs
                                show progress as of September 30,
                                1990. The white segment of each
                                graph shows the portion done by the
                                Super fund, the striped segment shows
                                the Federal Facility and other leads
                                portion; the black segment shows the
                                portion done by private parties.
                           0       200      400       600      800     1,000

                           Number of Projects at Each Stage
* All Records of Decision are Federal Responsibility
Note: 'Fund leads" include F. S. FE, SE. EP, and CG.
    "RP leads" include RP. MR, and PS.
    Tederal Facility and Other leads" include FF, SN, SR.
                                   1,200
                                   1,400
                                               PROJECT
Chart-3.4.1
                                   Pull Date: 10/19/90 DATA
                                   Print Date: 12/1 1/90
                                               in-33

-------
   Remedial Program [Project!Accomplishments
      200-r
                          (Post SARA)
                                                   Fund Lead Response

                                                   PRP Lead Response

                                                   EPA Selected Remedy
       0
                                                     90
NPL RESPONSE
 ACTIONS *--
Chart-3.4.2
Total RI/FS  Total ROD
   642        521
Total RD
  512
Total RA
  311
                                       Print Date: 11/19/90
                                                          PROJECT
                                                           DATA
                              ffl-34

-------
Ongoing NPL Work
EOY EOY EOY EOY
Activity FY87 FY88 FY89 FY90
RI/FS
State Lead (Fund)
Federal Lead (F & FE)
EPA (EP)
PRP
Mixed Funding (MR)
PRP Under State Order (PS)
State Enforcement
Federal Facility
Totals RI/FS
RD
State Lead (Fund)
Federal Lead (F & FE)
EPA (EP)
PRP
Mixed Funding (MR)
PRP Under State Order (PS)
State Enforcement
Federal Facility
Totals RD
RA
State Lead (Fund)
Federal Lead (F & FE)
EPA (EP)
PRP
Mixed Funding (MR)
PRP Under State Order (PS)
State Enforcement
Federal Facility
Totals RA

Source: PC-CERCLIS
MGMT-08 Chart -3.4.3

94
228

206


47
22
597

32
59

28


2
1
122

24
33

22


1
1
81




68
213

211


23
28
543

30
85

39


2
2
158

25
64

35


1
7
132




66
231
4
242

57
1
72
673

31
115
1
102
3
6

6
264

39
96

68
4
5

7
219

Pull Date:
Print Date:

55
220
18
258

76

215
842

29
121
1
155
4
16

18
344

38
103

94
3
13

8
259
PROJECT
10/19/90 L^£]
11/09/90 DATA
rn-35

-------
     Emergency Actions Are Taken When
  Needed at Both NPL and Non-NPL Sites
                        NPL Other 12
                     NPL Fund 485
NPL =
Non NPL =
TOTAL=
 710
1665
2375
NPLPRP
                 Non-NPL PRP
Note:  A Supcrfund Site may have more than one Emergency Action.
    "Fund leads" include: F, S, FE, SE, EP, CG.
    "PRP leads" include: RP, MR, PS.
    "Other leads" include: FF, SN, SR

Chart-3.4.4
                                  Non-NPL Other 0
                    Non-NPL Fundl 303
                                                I  I Fund

                                                \2 D Other Leads
                                                  PROJECT
                                        Pull Date: 10/19/90
                                        Print Date: 10/29/90
                                          DATA
                              IH-36

-------
Removal Action Starts by Fiscal  Year
                 NPLandNon-NPL
                                        NON-NPL
                                        NPL
  300-
        FY87
FY88
 FY89
FY90
     Removal Action Completions
               by Fiscal Year
  300-
                 NPL and Non-NPL
                    DNON-NPL
                   III! NPL
 CD
  200-
 S
 a.
  100-
        FY87
Source: PC-CERCLIS
Chart-3.4.5
FY88
FY89         FY 90
               Pull Date: 10/19/90
               Print Date: 12/10/90
                                            PROJECT
                DATA
                      m-37

-------
   Removal Action Starts Fund Lead
        Emergency, Time Critical, Non-Time Critical
  300n
                     NON-NPL
                     NPL
                            Emergency

                             12.56
                         Non-Time
                          Critical
                          2   144
         FY87
FY88
FY89
FY90
      Removal Action Completions
                  Fund Lead
        Emergency, Time Critical, Non-Time Critical
  300 -
                                         NON-NPL
                                         NPL
  200-
 CL



 I
  100-
         FY87
Source: PC-CERCLIS
Chart-3.4.6
FY88
FY89
FY90
                                               PROJECT
               Pull Date: 10/19/90
               Print Date: 12/10/90
                                                DATA
                        m-ss

-------
         Emergency Response Division
          FY 87-9O Fund Lead Starts
       NPL Non-NPL Total
Source: CERCL1S
Chart-3.4.7a
Pull Date: 10/19/90
Print Date: 12/07/90
                                                    PROJECT
DATA
                          IE-39

-------
           Emergency Response Division
        FY 87-9O Fund Lead  Completions
            Emergency
  Time-Critical
 Non-Time Critical
         NPL Non-NPL Total
NPL Non-NPL Total
NPL Non-NPL Total
NPL Non-NPL Total
 Total
 Completions
Source: CERCLIS
Chart -3.4.7b
                           Pull Date: 10/19/90
                           Print Date: 12/07/90
                                                            PROJECT
                        DATA
                              m-40

-------
 Removal Action Summary Responsible Party
     Lead Starts & Completions PY 87-9O
Source: (pending)
Chart-3.4.7c
                                                 PROJECT
Pull Date: 10/19/90
Prim Date: 12/07/90
DATA
                         m-4i

-------
      Section IV: Analysis  of Program   Implementation
Cost and Duration of Events
    •    Duration and Dollars
         This table presents by lead category the number of events, the average duration In quarters and the average
         cost of major remedial events for both completed and ongoing events.
    •    Average Duration and Cost of RI/FS
         These charts show the duration and cost of ongoing and completed RI/FS for each Region.
    •    RI/FS Duration by Region
         These charts describe the percentage of ongoing and completed RI/FS in duration categories for each
         Region.
    •    Historical Performance by Region Operable Units with Duration from ROD to RD
         Greater than 8 Months
         These charts describe for RODs that started in FY87, FY88. and FY89 the percentage of operable units with
         duration from ROD to RD start greater than 8 months.  Both actual and planned RD starts are presented.
    •    Duration from First ROD to Remedial Design  Start
         These charts describe the duration by time categories from first ROD signature to remedial design
         start for each Region.  These charts present both planned and actual duration.
    •    Duration from First Fund ROD to Fund RD Actual Start
         These charts describe the duration by time categories from Fund lead first ROD signature to Fund lead
         Remedial Design Actual Start for each Region.
    •    Duration from First RP ROD to RD/RA Negotiation Completion
         These charts describe the duration by time categories from RP lead first ROD to RD/RA Negotiation
         Completion for each Region.
    •    Removal Starts  and Completions
         This table shows the number and duration in days of Removal actions for each Region.
                                             IV-1

-------
   Section IV: Analysis of Program  Implementation  (com d.)
    •    Removal (Fund) Starts and Completions
         This table shows the number and duration in days of Fund Removal actions for each Region.

    •    Addressed NPL Universe Sites - RA Started and Average Duration from RI/FS Start
         to RA start
         The first chart shows the number of NPL sites, addressed sites, and RA addressed NPL sites by Region. The
         second chart shows the duration from RI/FS start to RA start by Region.

Trend Analysis - RP Involvement in Superfund

    •    Addressed NPL Universe Sites - PRP Involvement
         This chart shows by Region the number of NPL sites, the number of addressed sites, and the number of sites
         which have had responsible party (RP) involvement for remedial or removal events at some time.

    •    Enforcement Involvement in Remedial Pipeline Events
                                          IV-2

-------
                                                 DURATION AND  DOLLARS

RIFS Duration
Fund Lead
RP Lead
Takeovers
Other
RD Duration
Fund Lead
RP Lead
Takeovers
Other
RA Duration
Fund Lead
RP Lead
Takeovers
Other
RV Duration
Fund Lead
RP Lead
Takeovers
Other
* Dollars are for EPA
1) Duration measured
2) Duration measured

Avg Qtrs

10.6
12.8
17.7
10.2

5.0
3.4
10.9
2.5

5.5
3.1
none
4.1

2.2
3.0
4.9
3.3
Costs only.
from actual start
from actual start
Completed (1)

Avg Dollars Events

$704,126
$32,682*
$316,701
$53,658

$429,124
$14,099*
$593,653
$115,478

$2,406,918
$26,680*
none
$172,778

$378,886
$76,329*
$281,799
$1,353

date to actual complete date.
date to last day of plan complete

399
125
72
33

154
103
5
23

76
58
0
18

348
138
6
9


FY/O.

Avg Qtrs

15.6
13.9
21.6
13.7

9.6
8.7
12.4
9.9

11.6
14.0
16.3
23.0

11.4
14.9
15.9
31.9



Ongoing ( 2 )
Avg Dollars

$1,355,297
$20,284*
$466,859
$6,127

$944,754
$135,799*
$733,199
$2,381

$7,036,447
$125,437*
$10,476,701
$0

$874,707
$197,308*
$253,937
$0




Events

227
233
66
189

129
145
15
21

124
89
7
15

47
52
9
7



Source:  PC-CERCLIS
MGHT-OA
                                                         rv-3
Pull date: 10/19/90
Print date: 11 A/90

-------
                         AVERAGE DURATION OF  RI/FS
           
-------
   1CO
LU
o
cr
LU
D.
                Region 1
                                 RI/FS DURATION BY REGION
                               (percentage in each duration category)
                       Region 2
Region 3
                        (43 ongoing
                       52 complete)
                              (143 ongoing
                             130 complete)
       (116 ongoing
       97 complete)
                                                                               BODE
                Region 4
                                                    Region 6
                        (83 ongoing
                        74 complete)
                             (135 ongoing
                             140 complete)
        (22 ongoing
        66 complete)
               ABODE
                Region 7
                     A  B
                      Region 8
Region 9
                                                      (47 ongoing
                                                     43 complete)
 (51 ongoing
46 complete)
       (110 ongoing
       57 complete)
               ABODE
                Region 10
                        (56 ongoing
                       21 complete)
                                       Ongoing
                                      I Complete
                                       LEGEND
                              Time Duration Categories
                             A  =    Up to 8 quarters
                             B  =    9 to 16 quarters
                             C  =    17 to 24 quarters
                             D  =    25 to 32 quarters
                             E  =    More than 32 quarters
                             1   -    Program goal of 8 quarters
                   BODE
     Source: RI/FS ROD Duration
     MGMT-O1S Chart 4.05
             Budget Assumption: 8 Quarters for Fund lead RI/FS and 10 Quarters for
             Potentially Responsible Parter leadRI/FS.
             Note: Ongoing measured from RI/FS starts to last day of planned ROD.
             Complete measured from RI/FS start to ROD.
                                                          Pull Date: 10/19/90
                                                         Print Date: 10/31/90
                                                 IV-5

-------
       100
       90
Act RD < 8 mos
Act RD > 8 IT1OS
Pin RD > 8 mos
                      Historical Performance by Region
               Operable Units with Duration from ROD to RD
                            Greater than 8 Months
                                          Regions
                                                        Note: Bars illustrate ROD signature to RD
                                                        actual or planned start greater than 8 months.
                                          IV-6

-------
               DURATION FROM FIRST ROD TO REMEDIAL DESIGN START
                              (percentage in each duration category)
                Region
 Region 2
                                                      (76 actual
                                                     16 planned)
                                                           Region 3
              ABODE
                Region 4
                             A   B  C   D   E
                              Region
                             ABODE
                              Region 6
ABODE
ABODE
                                                                         ABODE
    00
LU
O
cc
LU
CL
                Region 7
                              Region 8
                              Region 9
               ABODE
               Region 10
                             ABODE
                             ABODE
                        Planned

                        Actual
                 LEGEND
         Time Duration Categories
          A  =    Up to 4 months
          B  =    121-240 months
          C  =    24J-360 months
          P  =    361-480 months
          E  =    More than 16 months
          j   _.    Program goal, 120 days
                                   As of FY90 PRP RD Start is defined as contract award. PRP RD Start was
                                   formerly defined as the lodging of the consent decree. As a result, some of
                                   the increase in the ROD to RD lag is attributable to this change in definition.
    Source: Lag From First ROD to First Actual RD Stan & Lag From First ROD to First Planned RD Start
    MGMT-O1S Chart 4.06
                                                                 Pull Date: 10/19/90
                                                                Print Date: 10/28/90
                                              IV-7

-------
      DURATION FROM FIRST FUND ROD TO FUND RD ACTUAL START
                       (percentage in each duration category)
           Region 1
         Region 2
  Region 3
         A  B  C  D  E
           Region 4
         Region 5
         ABODE



H
Z
UJ
O
cr
UJ
0.


100
90
80
70
60
50
40
/
-
-
_i
-
—
-
30 -I
20
10
n
-
—





/


/



(33 events)





2


1






f


/—*
4A /•£

                                                         90-
                                                         80-
                                                      H  70^
                                                      oi  6°-
                                                      O  50-
                                                      CE  An _:
                                                      Uj  ^u
                                                      CL  30-
                                                         20-
                                                         10-
                                                          0
  Region 6
                                                        l00A(20events)
                                 L&a
                                      ?w/////
       ABODE
ABODE
           Region 7



\-
z
UJ
o
cr
LJJ
Q.


100
90
80
70
60
50
40
30
20
1 r\
10
n
/
-
-
_
-
-
-
-
-







' ':!!'i
(6 events)



1



P
M











7 ///////
  100
   90-
   80-
I-  70-
5  60
Q  50-
   40-
   30-
   20-
   10-
                            cr
                            LU
                            Q.
         Region 8
                                    (4 events)
                                           i
         ABODE
       ABODE
  Region 9



H
Z
LJJ
O
cr
LJJ
Q.


100 -/
90-
80-
70-
60-
50-
40-
30-
20-
10-
n "




|


(9 events)




2

/
fl
/7I/71
WZTMrnw
ABODE
          Region 10



s
0
tr
LJJ
Q.


100 -/
90-
80-
70-
60-
50-
40-
30-
20-
10-
n."



/!



•:•:
/ .
(4 events)


r-A /-A
~M


' • •
•, -.
/ /


-•••:•'•




/





///////
         ABODE

Source: Lag From First Fund ROD to First Fund RD
Chart 4.06
                                                  LEGEND
                                           Time Duration Categories

                                            A =    Up to 120 days
                                           i 'P =    121-240days
                                            C =    241-360 days
                                            D -    361-480days
                                            E =    More than 480 days
                                       Pull Date: 10/19/90
                                       Print Date: 10/30/90
                                     IV-8

-------
Di
100 -i
90-
80-
H 70^
g 60-
O 50-j
0. 30-
20-
10-
o
100-
90-
80-
H 70-
g 60-
0 50-^
o! 30-
20-
10-
0 —
100-H
90-
80-
H 70^
g 60-
O SO-
IL 30-
20-
10-
o
100-)
90-
80-
t 70-
g 60-
O 50-
CE 40 -
Q! 30-
20 -:
10 —
o
JE
//
t
/
\
/
/
//
LATIONFROM FIRST RP ROD TO RD/RA NEGOTIATION COMPLETION
(percentage in each duration category)
Region 1 Region 2 Region 3
(9 events)
/ / '•:•• yW1 wSy*
\ B C
Region 4
(22 evenfs)
^3/7
1 • 1 ^;
If IP if
^ B C
Region 7
(10 events)
/~j
M ;SS isj
II If
W//W-JT
\ B C
Region 10
(5 events)
jj5j
2iflP
ABC
Source: Lag From First ROD
Chart 4.07
100-
90-
80-
1- 70-
g 60-
O 50-
/~A E 40-
/ /f. |jj HU .
ill //| Q- 30-
i||iii 2°-:
D E
100-
90-
80-
H- 70-
g 60-
o so-:
E 4°J
S 30-j
D E
100n
90-
80-
H 70-
g 60-
0 50-
E 40~.
/~A °- 30~
£|i| 20-
^/7 1?^
D E

/////
D E
o First Completion of Rl
/
|
;
/
/
1
j ''.'•
(11 events) 100_
90-
80-
t 70-:
g 60-
_. 0 50-
/A ^ 40-
tw?S: /~7( UJ -
y^ ill .!• /<<| D. 30 -
V B C D E
Region S
(19 events) 100_
90-
80-
2 60^
O 50-^
^ B C D E
Region 8
(7 events) 100
90-
80-
H 70^
g 60-
//\ O 50-
ffl^^ sS:
IlilZM 20^
/ / wPv^7 1°-
/
1
(17 events)
&
i
I
ABCDE
Recion 6
/
1
/
(13 events)
t B C D E
Region 9
(12 events)



ABCDE ABCDE

LECEND
Time Duration Categories
A = Up to 120 days
B = 121 -240 days
C = 241-360 days
! p = 361-480days
E = More than 480 days

)/RA Negotiation Pull Date: 10/19/90
Print Date: 10/28/90
IV-9

-------
                                       REMOVAL  (FUND)  START  AND  COMPLETIONS


Region
01
02
03
04
05
06
07
08
09
10
Totals
Two sites with

Since Inception
(NPL And Non-NPL)
144
227
251
362
268
162
110
80
149
49
: 1802
removal complete dates

Since Inception
(NPL And Non-NPL)
116
181
221
329
228
141
90
66
145
40
1557
lack start dates.
Ongoing Removal
Days
0-90
15
12
5
7
9
9
3
8
3
3
74

Days
91-180
0
2
7
7
9
0
4
1
1
1
32

Days
181-270
6
6
3
2
2
6
3
2
0
1
31

Days
271-360
0
0
2
3
4
0
1
0
0
1
11

Days
361-450
4
11
3
0
3
0
3
0
0
1
25

Days
>450
3
15
10
15
13
6
6
4
0
2
74

1
Total
28
46
30
34
40
21
20
15
4
9
247

Source: PC-CERCLIS
MGMT-09
Pull date:  10/19/90
Print date: 11/4/90
                                                       IV-10

-------
                                            REMOVAL  STARTS  AND COMPLETIONS

Region
01
02
03
04
OS
06
07
08
09
10
Totals
Four sites with
Removal Starts
Since Inception
(NPL And Non-HPL)
195
284
384
435
363
199
207
132
185
80
: 2464
removal complete dates
Removal Completions
Since Inception
(NPL And Non-NPL)
154
218
303
385
280
173
158
103
174
61
2009
lack start dates.

Days
0-90
18
16
11
12
11
9
9
12
5
4
107

Ongoing Removal
Days
91-180
3
4
14
10
11
0
9
4
2
3
60

Days
181-270
7
6
4
6
9
7
4
4
1
2
50

Days
271-360
0
0
8
3
8
2
2
1
0
2
26

Days
361-450
5
14
4
0
4
1
6
0
0
1
35

Days
>450
8
26
40
20
40
7
20
9
3
8
181

. .. 	 ,
Total
41
66
81
51
83
26
50
30
11
20
459

Source: PC-CERCLIS
MGMT-09
Pull date: 10/19/90
Print date: 11/4/90
                                                         IV-11

-------
       Addressed NPL Universe  Sites —
             Remedial Action Started
                               267
               NPL Sites (1,236)
               Addressed NPL Sites (1,119,91%)
               RA Addressed NPL Sites (310,25%)
O 150-

|l25-
                                                   8
                                 10
                     234567
                                      Regions
Note: NPL Sites include sites proposed to the NPL, on the final NPL, and removed or deleted sites. Ad-
    dressed sites have had Removal, RI/FS, Remedial Design, or Remedial Action Starts.
    Remedial Construction excludes Removal activity                          Pull Date: 10/19/90
                                                              Print Date: 10/29/90

  Average Duration  From RI/FS Start to RA  Start
                                                      10
                         (30)
Region
(33)   (22)
                                             (13)   (12)   (9)    (5)
                (19)   (32)   (31)
Note: National Average Duration = 4.1 years
Source: Percent of Final Sites that have reached Remedial Construction.
      Average Duration From RI/FS Completion to RA Start MGMT - 01V Chart - 4.10
                                                        Pull Date: 10/19/90
                                                        Print Date: 10/28/90
                              IV-12

-------
      Addressed  NPL Universe Sites -  PRP  Involvement
                                              267
                                                               NPL Sites-1,236
                                                               Addressed NPL Sites - 1,119 (91%)
                                                               RP Addressed NPL Sites - 771 (62%)
                                                                                              55
                                                                                            10
 NOTE: NPL sites include sites proposed to the NPL, on the final NPL, and removed or deleted sites.
      Addressed sites have had removal, Rl/FS, remedial design, or remedial action starts.
      RP sites have had responsible party lead for these events at some time.
      RP leads include the following: federal facilities, mixed funding - Fed/RP, PRP response under slat order with
	funding, responsible parley response under Federal orders, and PRP response under state order.
 Pull Date: 10/19/90
Print Date: 10/31/90
                                                IV-13

-------