102   MONITOR

   ENVIRONMENTAL   PROTECTION    AGENCY
                                                   VOLUME        11
                                                   NO.    2
                                                   FEBRUARY, 1981
EPA COMMENTS ON ENVIRONMENTAL IMPACT STATEMENTS AND OTHER ACTIONS
IMPACTING THE ENVIRONMENT DURING THE PERIOD OF JANUARY 1, 198]
AND JANUARY 31, 1981

                *************************************

ENVIRONMENTAL IMPACT STATEMENTS FILED WITH EPA FOR JANUARY, 1981

-------
Questions or comments  on  this publication  should be addressed
to:
                          Editor
                          102  Monitor
                          Environmental  Protection Agency
                          Office of Federal  Activities  (A-104)
                          401  M Street,  SW
                          Washington, D.C.   20460
                          (202)  245-3006

-------
COPIES OF ENVIRONMENTAL IMPACT STATEMENTS MAY  BE OBTAINED FROM:
   1.   AGENCY CONTACT:  The name, address and telephone  number for
                        each Federal Agency is listed within the
                        text of the EISs filed.
   2.   INFORMATION RESOURCES PRESS
       1700 North Moore Street
       Suite 700A
       Arlington, VA  22209
       (703) 558-8270
                        xeroxed Copies - $ 0.20 per page
                        Microfiche - $6.00 per statement up  to  five
                                     fiche (490 pages), $1.75 each
                                     additional fiche  (98 pages)

                        Postage and handling will be added to orders
                        for  microfiche or hard copies of single
                        statements.

-------
                            TABLE    OF    CONTENTS


                                                                                Page

1.  EPA Comments on Environmental Impact Statements and other
    Actions Impacting the Environment During the Period of
    January 1, 1981 and January 31, 1981                                          1

2.  State and County Index of ElS's Filed during January, 1981                   19

3.  Agency and Bureau Index of EIS's Filed during January, 1981                  24

4.  Monthly Statement Summary for January, 1981                                  28

5.  Environmental Impact Statements Filed January, 1981

    US Army Corps of Engineers                                                   29

    Department of Agriculture                                                    33

    Department of Commerce                                                       35

    Department of Defense, Army                                                  37

    Department of Energy                                                         39

    Department of HUD                                                            41

    Department of Interior                                                       45

    Department of Labor                                                          50

    Department of Transportation                                                 51

    Environmental Protection Agency                                              59

    General Services Administration                                              64

    Interstate Commerce Commission                                               65

    Nuclear Regulatory Commission                                                66

6.  Annual Cumulative Summary for 1981                                           67

7.  102 Monitor Subscription Information                                         68

-------
           AGFNCY COMMENTS ON ENVIRONMENTAL
             IMPACT STATfcMEMTS AND nTHEP
           ACTIONS IMPACTING THF ENVIRONMENT
     PURSUANT TO THF REQUIREMENTS OF SECTION 10?(?)(C> OF
    NATIONAL FNVIRQNMENTAI  POLICY ACT OF 1969, ANn SECTION
30Q OF THE CLEAN AIR ACT, AS AMFNDED, THE ENVIRONMENTAL
PROTECTION AGFNTY (EPA) HAS REVIEWED AND COMMENTED IN
WRITING ON FEDERAL AGENCY ACTIONS IMPACTING THE ENVIRONMENT
CONTAINED IN THF FfiLLOWTNG APPENDICES DURING THE PERIOD OF
JANUARY 1, 19R1 AMD JANUARY 31,
     APPENDIX I CONTAINS A LISTING OF DRAFT ENVIRONMENTAL
IMPACT STATEMENTS MFVIEWEP AND COMMENTED UPON IN WRITING
DURING THIS REVIEW PERIOD.  THE LT»ST INCLUDES THE FEDFKAL
AGENCY RESPONSIBLE FOR THF STATFMENT, THE NUMRER AND TITLF
OF THF STATEMENT, THE CLASSIFICATION OF THE NATURF OF EPA'S
COMMENTS AS DFFTNFD IN APPENDIX IT, AND THE EPA SOURCF FOR
COPIES OF THE COMMENTS AS SFT FORTH IN APPENDIX VI.

     APPENDIX IJ CONTAINS THE DFFINITIONS OF THE CLASSIFICA-
TIONS OF FPA'S CQMMFNTS ON THF DRAFT ENVIRONMENT IMPACT
STATEMENTS AS SF.T FORTH IN APPENDIX I.

     APPENDIX ITI CONTAINS A LISTING OF FINAL ENVIRONMENT AL
IMPACT STATEMFNTS RFVIEW£n AND CUMMFNTE.D UPON IN WRITING
DURING THF REVIFW PFRTOD.  THF LISTING INCLUDES THfc FFDFRAL
APFNCY RESPONSIBLE FOR THF STATFMENT, THE NUMBER AND TITLF OF
THF STATEMENT, A SUMMARY OF THE NATIIKF OF EPA'S COMMENTS AND
THE EPA SOURCE FOR COPIFS OF THE COMMENTS AS SET FORTH IN
APPFNDIV VI.

     APPENDIX IV CONTAINS A LISTING OF FINAL FNVIRONMFNTAl
IMPACT STATF.MFNTS REVIEWED RUT NOT C'lMMFNTED UPON BY FPA
DUPING THIS RF.VTEW PERIOD.  THE LISTING INCLUDES THF FEDERAL
AGENCY RESPONSIBLE FOR THE STATFMENT, THE NUMBER AND TITLF
OF THF STATEMENT, -AND THE EPA SOURCF OF REVIEW AS SFT FORTH
IN APPENDIX vi.

     APPENDIX V CONTAINS A I ISTTNG OF PROPOSED FEHERAl. AGFNCY
REGULATIONS, LEGISLATION PROPOSFD BY FEDERAL AGFNCIFS, AND
ANY OTHFR PROPOSED ACTIONS PEVIFWED AND COMMENTED UPON IN
HRITIMG PURSUANT TC SECTION 309CA) OF THE CLEAN AT« ACT, AS
AMFNDFD, DURING THE REFFRFNCEO PEVIF^ING ^FMIOD.  THIS
LISTING INCLUDES THF FEDERAL AGFNCY WFSPQNslHLE FOR THE
PROPOSED ACTIONS, THE TITLF OF THE ACTKJN, A SUMMAPY OF THF
NATHRF nF EPA'S COMMENTS, AND 1HE SOURCF Ff)H COPIFS OF THF
COMMENTS AS SFT FORTH IN APPENDIX VI.

     APPENDIX VI CONTAINS A LISTING UF THE NAMES AND
AODRESSFS OF THF SOURCES OF EPA REVIEWS ANf) COMMENTS LISTING
IN APPENDICES I, II, IV, AND V.

-------
                               -2-
     CUPIFS HF THF  FPA  MANUAL  SFTTING FORTH THE PHLTCTER AND
PROCEDURES FOP FPA«<*  REVIF*  OF AGENCY ACTIONS MAY BF OBTAINED
BY WRITING THF OFFICE OF  FEDERAI  ACTIVITIES,  ENVIRUNMFNTAL
PROTECTION AGFNCY,  ROOM 2119 (A-10a)  WATERSIDE MALL, S.W.
HASHINGTCN» D.C.  P0060, TFLFPHUME 2n2/2«5-3006.  COPIF.S OF
THE DRAFT AND FTNAL  ENVTRPNMENTAL IMPACT STATEMFNTS
RFFFHENCED HERJN  ARE  AVAILABLE FROM THE  ORIGINATING FFUEKAL
OEPARTMFNT OR
                                  OFFICE OF FEDERAL ACTIVITIES


DATFDt February 23,  1981

-------
                                                         APPENDIX I

                                      DRAFT ENVIRONMENTAL  IMPACT STATEMENTS FOR WHICH
                                               COMMENTS  WCRL  ISSULD BETWEEN


                                               JANUARY 1,  1981 AND JANUARY  31, 1981
IDENTIFYING
NUMBER
CIVIL AERONAUTICS
D-CAB-K51027-CA
CORPS OF ENGINEERS
DS-COE-A38006-TX
D-COE-D32015-00
D-COE-D35026-VA
D-COE-D39008-00
TITLE
BOARD
JOHN WAYNE AIRPORT, EFFECTS OF MULTIPLE PERMISSIVE AUTHORIZATION OF ADDITIONAL
AIR SERVICE, ORANGE COUNTY, CALIFORNIA
TAYLORS BAYOU PROJECT, DRAINAGE AND FLOOD CONTROL, JEFFERSON COUNTY, TEXAS
GALLIPOLIS LOCKS AND DAM REPLACEMENT, OHIO RIVER, WEST VIRGINIA AND OHIO
TYLERS BEACH, MAINTENANCE DREDGING, ISLE OF WIGHT COUNTY, VIRGINIA
FLOOD CONTROL, SHORE EROSION CONTROL AND NAVIGATION FOR SMITH ISLAND, MARYLAND
NATURE OF
COMMENTS
L01
L01
L02
ER2
ER2
COPIES OF
COMMENTS
J
G
D
D
I
D V
 D-COE-F02001-00

 D-COE-K36047-CA


 D-COE-K69005-CA
AND VIRGINIA

US LAKE ERIE NATURAL GAS RESOURCE DEVELOPMENT, OHIO, NEW YORK, AND PENNSYLVANIA

SEPULVEDA FLOOD CONTROL BASIN AND RECREATION AREA, UPDATED 1980 MASTER PLAN,
CALIFORNIA

1984 OLYMPIC GAMES, NEW CONSTRUCTION AND REFURBISHMENT PROJECTS, LOS ANGELES,
CALIFORNIA
DR-COE-L39010-WA     SEQUIM BAY BOAT HAVEN, MARINA FACILITY, CLALLAM COUNTY, WASHINGTON

DEPARTMENT OF AGRICULTURE
 D-AFS-A82106-00
 D-AFS-F61012-IL
PROPOSED COOPERATIVE GYPSY MOTH SUPPRESSION AND REGULATORY PROGRAM ACTIVITIES,
NORTHEASTERN STATES (USDA FS-DEIS 81-01)

SHAWNEE HILLS NATIONAL RECREATION AREA POPE, HARDIN, GALLATIN AND SALINE
COUNTIES, ILLINOIS
L02

L02


ER2


ERl



LO2
F

J

-------
                                                                                                      GENEKAL      SOURCE
  IDENTIFYING                                                                                        NATURE OF   FOR COPIES
    NUMBER	TITLE 	COMMENTS    OF COMMENTS

DEPARTMENT OF COMMERCE

DS-NOA-K90007-00     PACIFIC COAST GROUNDFISH FISHERY MANAGEMENT PLAN  (FMP), WASHINGTON, OREGON        L01          J
                     AND CALIFORNIA

DEPARTMENT OF DEFENSE

 D-USA-G51007-TX     CANDIDATE ARMY REALIGNMENT, CONSOLIDATION OF ARMY AIRCRAFT DEPOT MAINTENANCE      LO1          G
                     MISSION AND FUNCTION, CORPUS CHRISTI, TEXAS

DEPARTMENT OF ENERGY

 D-DOE-J01036-CO     NAVAL OIL SHALE RESERVES, DEVELOPMENT POLICY OPTIONS, GARFIELD COUNTY, COLORADO   L01          I

DEPARTMENT OF INTERIOR

 D-BLM-A59005-00     ENERGY TRANSPORTATION SYSTEMS .INCORPORATED COAL SLURRY PIPELINE TRANSPORTATION    ER2           A
                     PROJECT, ARKANSAS, LOUISIANA, NEBRASKA, KANSAS, OKLAHOMA, WYOMING, COLORADO
                     AND SOUTH DAKOTA

 D-BLM-J61038-WY     SCAB CREEK PRIMITIVE AREA, WILDERNESS STUDY, WYOMING                              LO1           I

 D-BLM-K65043-CA     PROPOSED LIVESTOCK GRAZING MANAGEMENT PLAN, BENTON AND OWENS VALLEY PLANNING      LO2          J
                     UNIT, INYO AND MONO COUNTIES, CALIFORNIA

DEPARTMENT OF TRANSPORTATION

 D-FAA-K51028-CA     TORRANCE AIRPORT, PROPOSED INSTALLATION OF NAVIGATIONAL AIDS, LOS ANGELES         L01          J
                     COUNTY, CALIFORNIA

 D-FAA-L51008-WA     OLYMPIC REGIONAL AIRPORT, JEFFERSON COUNTY, WASHINGTON                            LO1          K

 D-FHW-B40043-VT     US 7, VT-125 TO HAPPY VALLEY ROAD AND EXCHANGE STREET, ADDISON COUNTY, VERMONT    ER2          B

 D-FHW-B40044-VT     US 7, SOUTH BURLINGTON CITY LINE TO 1-189, CHITTENDON COUNTY, VERMONT             LO2          B
                     (FHWA-VT-EIS-80-02-D)

 D-FHW-G40084-NM     US 70 IMPROVEMENT, VICINITY OF  ALAMOGORDO TO TULAROSA, OTERO COUNTY,  NEW          ER1          G
                     MEXICO

 D-FHW-G40085-LA     BOSSIER RED RIVER PARKWAY,  LA-511 TO 1-20, BOSSIER CITY,  BOSSIER'PARISH,           L02          G
                     LOUISIANA

-------
                                                                                                      GENERAL      SuURCK
  IDENTIFYING                                                                                        NATURE OF   FOR COPIES
    NUMBER	TITLE	COMMENTS    OF COMMENTS

  D-FHW-G40086-NM     US  70 IMPROVEMENTS RUIDOSO AND HONDO VALLEY SECTION,  LINCOLN COUNTY,  NEW          ERl          G
                      MEXICO

  D-FHW-J40056-ND     COLUMBIA ROAD IMPROVEMENTS,  GRAND FORKS  COUNTY,  NORTH DAKOTA                      ERl          I

  D-FHW-L40102-OR     COAST RANGE  SUMMIT AND DUDLEE HILL,  CORVALLIS  AND  NEW PORT HIGHWAY  #33,  US  20,     L02          K
                      BENTON AND LINCOLN COUNTIES,  OREGON  (FHWA-OR-EIS-80-06-D)

  D-FHW-L40103-OR     COALBANK SLOUGH  BRIDGE REPLACEMENT,  OREGON  COAST HIGHWAY,  COOS  COUNTY, OREGON      LO1          K
                      (FHWA-OR-EIS-80-05-D)

  D-FHW-L40104-WA     BREMERTON FERRY  TERMINAL  PROJECT,  KITSAP COUNTY, WASHINGTON (FHWA-WA-EIS-80-04-D)  L02          K

  D-FHW-L40105-WA     WA-525,  WA-526 TO  MUKILTEO FERRY  TERMINAL,  SNOHOMISH  COUNTY,  WASHINGTON            ERl          K
                      (FHWA-WA-EIS-80-06-D)

FEDERAL ENERGY REGULATORY  COMMISSION

DS-FRC-A09804-00      RULEMAKING FOR SMALL POWER PRODUCTION AND COGENERATION FACILITIES,  EXEMPTIONS      L02          A     «J>
                      FOR GEOTHERMAL FACILITIES, DOCKET  NO. RM 81-2

DEPARTMENT OF HOUSING AND  URBAN DEVELOPMENT

 D-HUD-G85154-TX     MISSION  GLENN SUBDIVISION, FORMERLY  SCHUMANN TRACT, FORT BEND COUNTY, TEXAS        L02          G

 D-HUD-J85040-CO     MENOKEN  GOLF COURSE SUBDIVISION, MONTROSE COUNTY, COLORADO                         ERl           I

 D-HUD-J85041-CO     VILLAGE  NINE SUBDIVISION DEVELOPMENT, MESA COUNTY, COLORADO                        ERl           I

NUCLEAR REGULATORY COMMISSION

DA-NRC-A06140-TX     ALLEN'S CREEK NUCLEAR  GENERATING STATION, UNIT NO.  1, AUSTIN  COUNTY, TEXAS         LO1          G
                      (SEE AEC-A06140-TX)

RD-NRC-A22081-00     EXEMPTION  FROM LICENSING REQUIREMENTS FOR SMELTED ALLOYS CONTAINING RESIDUAL        3          A
                     TECHNETIUM-99 AND LOW-ENRICHED URANIUM, CONCERNING PROPOSED RULEMAKING
                      (NUREG-0518)

DS-NRC-E06009-SC     VIRGIL C.  SUMMER NUCLEAR STATION, UNIT NO.  1, FAIRFIELD COUNTY,  SOUTH CAROLINA    LO2          E

-------
                                  -6-

                                  API ,NDIX II

                   DEFINITIONS OF COWS FOR THE GENERAL NATURE
                                  OF EPA COf-MENTS

ENVIRONMENTAL IMPACT OF THE ACTION

LO—Lack of Objection

     EPA has no objections to the proposed action as described in the draft

impact statement; or suggests only minor changes in the proposed action.

ER—Environmental Reservations

     EPA has reservations concerning the environmental effects of certain aspects

of the proposed action.  EPA believes that further study of suggested alternatives

or modifications is required and has asked the originating Federal agency to

reassess these impacts.

EU-Environmentally Unsatisfactory

     EPA believes that the proposed action is unsatisfactory because of its

potentially harmful effect on the environment.  Furthermore, the Agency believes

that the potential safeguards which might be utilized may not adequately protect

the environment from hazards arising from this action.  The Agency recommends

that alternatives to the action be analyzed further (including the possibility of

no action at all).

ADEQUACY OF THE IMPACT STATEMENT

Category 1~ Adequate

     The draft Impact statement adequately sets forth the environmental Impact

of the proposed project  or action as well as alternatives reasonably available

to the project or action.

Category 2—Insufficient Information

     EPA "believes that the draft  Impact statement does not  contain sufficient

Information to assess fully  the environmental  Impact of the proposed project or

-------
                                  -7-
action.  However, from the Information  submitted,  the Agency Is able to
make a preliminary determination of the Impact on  the environment.  EPA has
requested that the originator provide the Information that was not Included in
the draft statement.
Category 3—Inadequate
     EPA believes that the draft impact statement  does not adequately assess the
environmental impact of the proposed project or action, or that the statement
inadequately analyzes reasonable available alternatives.  The Agency has
requested more information and analysis concerning the potential environmental
hazards and has asked that substantial revision be made to the impact statement.

-------
  IDENTIFYING
    NUMUfJR
          TITLE
                                                        APPENDIX III

                                       FINAL ENVIRONMENTAL IMPACT STATEMENTS FOR WHICH
                                                 COMMENTS WERL ISSUED BETWEEN


                                                 JANUARY 1, 1981 AND JANUARY 31, 1981
                                          GUNCKAL NATURE OF COMMENTS
                                                   SOURCE FOR
                                                   COPICS OF
                                                    COMMENTS
CORPS OF ENGINEERS
 F-COE-E02003-AL
 F-COE-G32032-AR
 F-COE-K32023-HI
 F-COE-K36020-CA
 F-COE-K85029-H1
FS-COE-L34003-OR
FOUR EXPLORATORY AND APPRAISAL HYDRO-
CARBON HELLS, MOBILE BAY, MOBILE
COUNTY, ALABAMA

WHITE RIVER NAVIGATION, BATESVILLE TO
MISSISSIPPI RIVER, ARKANSAS

MAALAEA HARBOR, LIGHT-DRAFT VESSELS,
MAUI, MAUI COUNTY, HAWAII

REDBANK AND FANCHER CREEKS INVESTIGA-
TIONS, FRESNO COUNTY, CALIFORNIA

WEST BEACH RESORT DEVELOPMENT,
HONOULIULI, EWA DISTRICT, ISLAND OF
OAHU, HONOLULU COUNTY, HAWAII
ELK CREEK LAKE, ROUGE TAVIR BASIN,
JACKSON COUNTY, OREGON
                                         EPA'S CONCERNS WERE ADEQUATELY ADDRESSED IN THE
                                         FINAL EIS.
EPA'S CONCERNS WERE ADEQUATELY ADDRESSED IN THE
FINAL EIS.

EPA'S CONCERNS HERE ADEQUATELY ADDRESSED IN THE
FINAL EIS.

EPA'S CONCERNS HERE ADEQUATELY ADDRESSED IN THE
FINAL EIS.

EPA'S CONCERNS WITH RESPECT TO WATER QUALITY AND
404 PERMIT ISSUES WERE NOT ADEQUATELY ADDRESSED IN
THIS FINAL EIS.  ADDITIONALLY, EPA QUESTIONS THE
USE OF THIS DOCUMENT AS A PROGRAMMATIC EIS SINCE
IT DEALS WITH A SITE-SPECIFIC PROJECT.

DESPITE THE EFFORTS ON THE PART OF BOTH AGENCIES,
EPA IS UNABLE TO ASSESS THE ENVIRONMENTAL IMPACT
OF THE PROPOSED PROJECT AND ALTERNATIVES DUE TO
THE INADEQUACY AND UNRESPONSIVENESS OF THE FINAL
EIS SUPPLEMENT.  THE SIGNIFICANT OUTSTANDING
QUESTIONS INCLUDE THE INCREMENTAL WATER QUALITY
IMPACTS AND THEIR EFFECT ON THE USES OF THE ROGUE
RIVER, COMPLIANCE WITH SECTION 404(b)(l) GUIDE-
LINES AND THE FLOODPLAIN MANAGEMENT AND PROTEC-
TION OF WETLANDS EXECUTIVE" ORDERS, AND THE LACK
OF A RIGOROUS ANALYSIS Of'PROJECT NEED AND
ALTERNATIVES.

-------
   IDENTIFYING
     NUMBER
          TITLE
                                        GENERAL NATURE OF COMMENTS
                                                   SOUK«.:C FUR
                                                   COPIES OF
                                                    COMMENTS
 F-COE-L36073-AK
KAKE HARBOR, ALASKA SMALL BOAT
HARBOR NAVIGATION  IMPROVEMENTS,
ALASKA
                                                            GENERALLY, EPA'S CONCERNS WERE ADEQUATELY
                                                            ADDRESSED IN THE FINAL EIS.  HOWEVER,  EPA HAS
                                                            CONTINUING CONCERNS ABOUT THE EVALUATION PRO-
                                                            CEDURES AND INFORMATION BASE THE CORPS USED FOR
                                                            THIS PROJECT.
DEPARTMENT OF COMMERCE
 F-EDA-B91016-RI
WOONSOCKET INDUSTRIAL PARK, EAST
WOONSOCKET, RHODE ISLAND
EPA'S REVIEW OF THE FINAL EIS NOTES CONCERN THAT
THE PROJECT'S POTENTIAL EFFECT ON NOISE LEVELS
AND AIR QUALITY ARE NOT RESOLVED IN THE FINAL PIS.
EPA HAS REQUESTED THAT EDA MAKE A COMMITMENT IN
THEIR RECORD OF DECISION TO COMPLETE A NOISE
ANALYSIS PRIOR TO THE DESIGN OF THE INDUSTRIAL
PARK WHICH WILL ALLOW MEASURES TO BE DEVELOPED
DURING THE DESIGN PHASE TO MINIMIZE OR ELIMINATE
POTENTIAL NOISE IMPACT.  THE AIR QUALITY ISSUES
ARE PRESENTLY RESOLVED TO EPA'S SATISFACTION
BASED ON THE SUBMISSION OF SUPPLEMENTAL AIR
QUALITY DATA AND DISCUSSIONS WITH EDA.  EPA HAS
REQUESTED EDA TO MAKE THIS ADDITIONAL AIR QUALITY
INFORMATION READILY AVAILABLE FOR PUBLIC REVIEW
UPON REQUEST.
DEPARTMENT OF INTERIOR
 F-BIA-G07020-NM
 F-BIA-K60008-NV
UTE MOUNTAIN UTE PROPOSED STRIP
COAL MINE, SAN JUAN COUNTY, NEW
MEXICO

RECREATIONAL LEASE OF WILDHORSE
RESERVOIR LANDS, TO SHOSHONE AND
PAIUTE INDIAN TRIBES OF DUCK VALLEY,
ELKO COUNTY, NEVADA
EPA'S CONCERNS WERE ADEQUATELY ADDRESSED IN THE
FINAL EIS.
EPA'S CONCERNS WERE ADEQUATELY ADDRESSED IN THE
FINAL EIS.
 F-BLM-A02160-00
PROPOSED OUTER CONTINENTAL SHELF
(OCS) 1981 OIL AND GAS LEASE SALES
A66 AND 66, GULF OF MEXICO, OFFSHORE
THE STATES OF TEXAS, LOUISIANA
EPA IS CONCERNED THAT THE ACTION BEING CONSIDERED
IN THE FEIS HAS CHANGED SIGNIFICANTLY SINCE IT WAS
PROPOSED IN THE DEIS.  SPECIFICALLY, THE PROPOSAL
IN THE DEIS EXPLICITLY EXCLUDED FLOWER GARDEN BANKS
TRACTS, AND 2 FLOWER GARDENS TRACTS, AS WELL AS 36
OTHER TRACTS FOR WHICH BIDS WERE REJECTED IN THE
1S80 GULF OF MEXICO LEASE SALES THAT WERE INCLUDED

-------
  IDENTIFYING
    NUMBER
         TITLE
 GENERAL NATURE OF COMMENTS
                                                                                          SUURCL FOR
                                                                                          COPIES OF
                                                                                           COMMENTS
                                                           IN THE PROPOSED ACTION IN THE FEIS.  NO
                                                           ADDITIONAL ENVIRONMENTAL ANALYSIS IS PRESENTED,
                                                           EVEN THOUGH SIGNIFICANT NEW INFORMATION IS AVAIL-
                                                           ABLE.  STATUS OF EPA'S NPDES PERMITTING PROCESS,
                                                           MARINE SANCTUARY DESIGNATION, AND EVIDENCE OF GAS
                                                           BLOWOUT THREATS IN THE AREA OF THE FLOWER GARDEN
                                                           BANKS SHOULD HAVE BEEN MADE AVAILABLE FOR PUBLIC
                                                           REVIEW AND COMMENT.  THERE ARE ALSO OTHER PROCED-
                                                           URAL PROBLEMS MAKING THE SITUATION MORE CONFUSING.
                                                           EPA RECOMMENDS NOT INCLUDING THESE TRACTS IN
                                                           THESE SALES AND THESE AND FUTURE UNSOLD TRACTS
                                                           SHOULD BE INTEGRATED INTO SUBSEQUENT SALE EISs
                                                           IN SUCH A WAY THAT A FULL AND CLEAR DISCLOSURE
                                                           OF THE ACTION IS MADE AVAILABLE.
F-BLM-E02004-AL
SOUTHERN APPALACHIAN  BEGIOHAL
COAL LEASING, ALABAMA
EPA'S CONCERNS WERE ADEQUATELY ADDRESSED IN THE
FINAL EIS.
F-BLM-K65040-CA
EASTERN SAN DIEGO PLANNING UNIT,
PROPOSED LIVESTOCK GRAZING AND
WILDERNESS MANAGEMENT, SAN DIEGO
COUNTY, CALIFORNIA
EPA'S CONCERNS WERE ADEQUATELY ADDRESSED IN THE
FINAL EIS.
                                                                                                                          O
                                                                                                                           I
F-BLM-K65042-CA
MOUNT DOME PLANNING UNIT, PROPOSED
DOMESTIC LIVESTOCK GRAZING PROGRAM,
SISKIYOU AND MODOC COUNTIES,
CALIFORNIA
EPA'S CONCERNS WERE ADEQUATELY ADDRESSED IN THE
FINAL EIS.
F-HCR-C61002-NJ
PINELAND NATIONAL RESERVE MANAGEMENT
PLAN, NEW JERSEY
EPA'S CONCERNS WERE ADEQUATELY ADDRESSED IN THE
FINAL EIS.  HOWEVER, EPA SEEKS RESOLUTION OF
OUTSTANDING ISSUES, PARTICULARLY POPULATION
PROJECTIONS.
F-HCR-K61052-CA
                    PROPOSED DESIGNATION OF FIVE
                    CALIFORNIA RIVERS IN NATIONAL WILD
                    AND SCENIC RIVERS SYSTEM, CALIFORNIA
                                       EPA'S CONCERNS WERE ADEQUATELY ADDRESSED IN THE
                                       FINAL EIS.
F-SFW-K39014-CA
                    TRINITY RIVER FLOWS MANAGEMENT PLAN,
                    MITIGATE LOSS OF ANADROMOUS FISHERY,
                    TRINITY AND HUMBOLDT COUNTIES,
                    CALIFORNIA
                                       WHILE THE EIS ADEQUATELY ASSESSES THE ENVIRONMENTAL
                                       IMPACTS OF THE PROPOSED ACTION, EPA HAS CONTINUING
                                       CONCERNS WITH RESPECT TO IMPACT ON SALMON MIGRATION,
                                       CONCENTRATIONS OF COPPER AND ZINC, MAINTENANCE OF
                                       DELTA WATER QUALITY STANDARDS,  LACK OF CONSERVATION

-------
   IDENTIFYING
     NUMBER
         TITLE
                                                             GENERAL NATURE OF COMMENTS
                                                   SOURCL FOP
                                                   COPIES OF
                                                    COMMENTS
DEPARTMENT OF TRANSPORTATION
RF-DOT-A55011-00
 F-FAA-B51005-MA
REGULATION IMPLEMENTING SECTION
504 OF THE REHABILITATION ACT OF
1973

PROPOSED DEVELOPMENT OF BIRD ISLAND
FLATS, LOGAN INTERNATIONAL AIRPORT,
BOSTON, SUFFOLK COUNTY,
MASSACHUSETTS
F-FAA-J52000-WY
                    JACKSON  HOLE  AIRPORT,  BOEING  737
                    SERVICE, TETON COUNTY, WYOMING
F-FAA-K51020-CA
                    LOS ANGELES INTERNATIONAL AIRPORT,
                    IMPROVEMENT PROGRAM, LOS ANGELES
                    CALIFORNIA
                                                            MEASURES AND PROPORTIONAL REDUCTIONS OF FLOWS TO
                                                            FISH AND WILDLIFE BENEFICIAL USES AS TO AGRICUL-
                                                            TURE DURING DROUGHT YEARS.
                                                            EPA'S CONCERNS WERE ADEQUATELY ADDRESSED IN THE
                                                            FINAL EIS.
 BASED ON THE EXISTING VIOLATIONS OF AIR QUALITY
 STANDARDS IN THE AREA,  ALREADY DESIGNATED NON-
 ATTAINMENT FOR CARBON MONOXIDE AND OZONE, AND
 THE SIGNIFICANT TRAFFIC INCREASES EXPECTED FROM
 THE PROPOSED ACTION,  EPA BELIEVES IT IS NECESSARY
 TO DEVELOP TRAFFIC FLOW IMPROVEMENT MEASURES AND
 OTHER POLLUTION OFFSET PROCEDURES IN ORDER TO
 PREVENT SIGNIFICANT ADVERSE  IMPACTS ON AIR QUALITY.
 BEFORE FAA AND MASSPORT PROCEED WITH THE PREPARA-
 TION OF THE RECORD OF DECISION.   EPA REQUESTS:
 THE COMPLETION OF THE AIR QUALITY ANALYSIS AS
 REQUESTED IN THE DRAFT  AND FINAL EIS COMMENT
 LETTERS;  A DETERMINATION THAT  INCREASED EMISSIONS
 CAUSED BY THE PROJECT ARE WITHIN THE AVAILABLE
 GROWTH INCREMENT AND  THEREFORE CONSISTENT WITH
 THE MASSACHUSETTS SIP;  AND A COMMITMENT TO
 IMPLEMENT MEASURES THAT WILL MITIGATE AIR QUALITY
 IMPACTS.

 EPA DETERMINED NOISE  IMPACTS FROM THE ACTION WOULD BE
 UNSATISFACTORY IN TERMS OF ENVIRONMENTAL QUALITY.
 EPA REFERRED THE MATTER TO THE COUNCIL ON ENVIRON-
 MENTAL QUALITY ON JANUARY 9, 1981,  RECOMMENDING
 DENIAL OF  THE PLANNED CERTIFICATION OF JET SERVICE
 AS  WELL AS OTHER ACTIONS TO  PROTECT THE  PARK FROM
 AIRCRAFT NOISE IMPACTS.

 THE FINAL EIS  DOES NOT  ADEQUATELY  RESPOND  TO  EPA'S
 CONCERNS RAISED ON THE  DRAFT EIS.  THEREFORE, EPA
CONTINUES TO  HAVE SERIOUS ENVIRONMENTAL RESERVATIONS
 REGARDING THE  POTENTIAL AIR QUALITY  IMPACTS THAT
MAY RESULT FROM THE PROPOSED PROJECT.  EPA REQUESTED

-------
    IDENTIFYING
      NUMBER
                               TITLE
                                                             GENERAL  NATURE  OF COMMENTS
                                                                                                 l''OK
                                                                                          coprrs OF
                                                                                           COMMENTS
 F-FHW-E40152-NC
 F-FHW-E40186-GA
HIGHWAY  IMPROVEMENT BETWEEN
'BREVARD  AND  1-26, TRANSYLVANIA,
HENDERSON AND BUNCOMBE COUNTIES,
NORTH CAROLINA

1-75, WIDENING AND RECONSTRUCTION,
NORTHSIDE DRIVE TO 1-285, FULTON
AND COBB COUNTIES, GEORGIA
FA-NHT-A52147-00     AVERAGE FUEL ECONOMY STANDARDS FOR
                     LIGHT TRUCKS MODEL YEARS 1983-1985,
                     PURSUANT TO SECTION 102  (2)(C).
                     PUBLIC LAW 91-190 83 STAT. 853, 42

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
THAT ADEQUATE  TECHNICAL  DATA BE  PROVIDED TO
DETERMINE CONFORMITY WITH THE  STATE  IMPLEMEN-
TATION PLAN.   IN ADDITION, THERE IS  NO  COMMITMENT
TO POST-CONSTRUCTION MONITORING  ALTHOUGH PRE-
DICTED VIOLATIONS  INDICATE NEED  AND  THERE ARE  NO
ADOPTED MITIGATION MEASURES TO PREVENT  VIOLATIONS
OF THE NAAQS.  EPA ALSO  COMMENTED ON HAZARDOUS
WASTE ISSUES AND NOISE ISSUES.

EPA IS CONCERNED ABOUT THE PROJECTS  IMPACT  ON  PRIME
AGRICULTURAL LAND AND STRONGLY ENCOURAGES NC/DOT
TO PLACE MORE VALUE ON OUR AGRICULTURAL RESOURCE
IN FUTURE EVALUATIONS OF HIGHWAY ALTERNATIVES.

EPA'S CONCERNS WERE ADEQUATELY ADDRESSED  IN THE
FINAL EIS.  HOWEVER, EPA WOULD LIKE TO  EMPHASIZE
THE NEED FOR MAINTAINING EROSION CONTROL  MEASURES
DURING THE LIFE OF THE PROJECT.

EPA'S CONCERNS WERE ADEQUATELY ADDRESSED  IN THE
FINAL EIS.
                                                                                                      to
                                                                                                      i
 F-HUD-E85063-GA
                     TURTLE CREEK SUBDIVISION MORTGAGE
                     INSURANCE, HOUSTON COUNTY, GEORGIA
 F-HUD-K85033-AZ     MIDVALE PARK DEVELOPMENT, PIMA
                     COUNTY, ARIZONA
DEPARTMENT OF JUSTICE
                                       EPA'S CONCERNS WERE ADEQUATELY ADDRESSED IN THE
                                       FINAL EIS.

                                       THE FEIS ADEQUATELY RESPONDS TO EPA'S CONCERNS
                                       RAISED IN THE DEIS WITH THE EXCEPTION OF THE ISSUE
                                       REGARDING THE LOSS OF CLASS I FARMLANDS.  HOWEVER,
                                       EPA URGES HUD TO CONSIDER THE CEQ MEMORANDA
                                       (AUGUST 30, 1976 AND AUGUST 11, 1980) AND TO CLARI-
                                       FY THEIR POSITION ON PROTECTION OF SIGNIFICANT
                                       AGRICULTURAL LANDS.
 F-JUS-K81011-AZ
                     FEDERAL CORRECTIONAL INSTITUTION,
                     PHOENIX, ARIZONA
                                       EPA'S CONCERNS WERE ADEQUATELY ADDRESSED IN THIS
                                       FINAL EIS.

-------
                                                         APPENDIX IV

                                        FINAL  ENVIRONMENTAL IMPACT STATEMENTS WHICH
                                        WERE REVIEWED  AND  NOT COMMENTED ON BETWEEN


                                             JANUARY 1,  1981 AND JANUARY 31, 1981

  IDENTIFYING                                                                                                     SOURCE OF
    NUMBER	TITLE	REVIEW

DEPARTMENT OF AGRICULTURE

 F-AFS-J65048-00     BEARTOOTH PLATEAU, LAND MANAGEMENT PLAN, CUSTER, GALLATIN AND SHOSHONE NATIONAL FORESTS,         I
                     MONTANA AND WYOMING

DEPARTMENT OF TRANSPORTATION

 F-FHW-J40040-CO     KIPLING TO INDEPENDENCE,1  1-70 TO RALSTON ROAD, JEFFERSON COUNTY, COLORADO                        I

 F-FHW-L40075-WA     WA-151 CHELAN STATION TO HUGOj IMPROVEMENTS, CHELAN AND DOUGLAS COUNTIES, WASHINGTON             K
                     (FHWA-WA-EIS-78-05-F)

NUCLEAR REGULATORY COMMISSION                                                                                               ,
_^—^—                                                                                              ^
                                                                                                                           LJ
 F-NRC-A01055-00     URANIUM MILLING PROJECT M-25 (NUREG-0706)                                                        A     '

-------
                                                         APPENDIX V
  IDENTIFYING
    NUMBER
                             TITLE
                                      REGULATIONS, LEGISLATION AND OTHER FEDERAL AGENCY
                                       ACTIONS FOR WHICH COMMENTS WERE ISSUED BETWEEN

                                          JANUARY 1, 1981 AND JANUARY 31, 1981
                                                               GENERAL NATURE OF COMMENTS
                                                                                            SOURCE FOR
                                                                                            COPIES OF
                                                                                             COMMENTS
CORPS OF ENGINEERS
 A-COE-D34004-VA
 N-COE-D35027-VA
 A-COE-D35028-MD
 A-COE-D36039-MD
ASSESSMENT, MAINTENANCE DREDGING OF
LOWER NORTHLANDING RIVER, VIRGINIA
BEACH, VIRGINIA
FNSI, TESTING OF RECENTLY LAUNCHED
HARBOR DREDGE YAQUINA, CHERRYSTONE BAR
CHANNEL, CAPE CHARLES, VIRGINIA

FNSI  AND ENVIRONMENTAL ASSESSMENT,
MAINTENANCE DREDGING OF CHESTER RIVER,
MARYLAND
ST. MARYS RIVER WATERSHED^ ENVIRONMENTAL
ASSESSMENT, MARYLAND
EPA HAS SERIOUS CONCERNS AFTER CONSIDERING THE
WATER POLLUTION POTENTIAL AS WELL AS OTHER
POSSIBLE EFFECTS ON THE ENVIRONMENT.  THE MAJOR
CONCERN IS WHETHER CHLORDANE IS PRESENT.  THE
ASSESSMENT INFERS THAT IF CHLORDANE HERE NOT
PRESENT, LAND BASED ALTERNATIVES MAY BE MORE
AVAILABLE.

EPA HAS NO OBJECTION TO THE PROPOSED PROJECT.
HOWEVER, EPA DOES REQUIRE THAT A STATE HATER
QUALITY CERTIFICATION BE ISSUED.

EPA HAS NO OBJECTIONS TO THE PROJECT AS PROPOSED
PROVIDED EPA'S STANDARD DREDGING CONDITIONS ARE
APPLIED AND GIVEN.  EPA FURTHER CONCURS WITH THE
USE OF THE 9 ACRE UPLAND SITE FOR DISPOSAL.
HOWEVER, THE CONTAINMENT STRUCTURE MUST BE
PROPERLY DESIGNED TO MINIMIZE THE EFFLUENT DIS-
CHARGE AND MEET THE APPROPRIATE STATE WATER
QUALITY STANDARDS.

EPA FINDS THE ENVIRONMENTAL ASSESSMENT TO BE
INADEQUATE.  EPA REQUESTS THAT A FULL ASSESSMENT
OF WETLAND RESOURCES BE DONE UPSTREAM, DOWN
STREAM WITHIN 1000 METERS AND IN THE WATERSHED
IMMEDIATELY SURROUNDING THE PROPOSED IMPOUNDMENT.
IN ADDITION, EPA REQUESTED THAT THREE REMAINING
PROPOSED DAMS IN THIS WATERSHED BE PRESENTED FOR
EVALUATION AT THE SAME TIME.

-------
   IDENTIFYING
     NUMBER
          TITLE
                                                             GENERAL NATURE OF COMMENTS
                                                  SOURl K FOk
                                                  COPIES OF
                                                   COMMENTS
DEPARTMENT OF ENERGY
 R-DOE-A09806-00
 A-DOE-A86177-00
10 CFR PART 485, DOCKET NO. CAS-RM-
80-121, PRICE SUPPORT LOANS FOR
MUNICIPAL WASTE ENERGY PROJECTS,
PROPOSED RULE AND REQUEST FOR
VOLUNTARY APPLICATIONS  (45 FR 71746)
                     COMPLIANCE WITH THE NATIONAL ENVIRON-
                     MENTAL POLICY ACT, NOTICE OF PROPOSED
                     AMENDMENTS TO GUIDELINES TO PROVIDE
                     FOR A CATEGORICAL EXCLUSION FOR
                     CERTAIN GRANTS OF ENTITLEMENTS FOR
                     PETROLEUM SUBSTITUTES  (45 FR 82987)
DEPARTMENT OF INTERIOR
 A-IGS-A02170-00
                     PROPOSED OUTER CONTINENTAL SHELF
                     (OCS) ORDERS GOVERNING OIL AND GAS
                     LEASE OPERATIONS IN THE ARCTIC,
                     ENVIRONMENTAL ASSESSMENT
                     (45 FR 83868)
EPA SHARES THE COMMON GOAL OF OPTIMIZING RECOVERY
OF ENERGY AND MATERIALS FROM SOLID WASTE, BUT IS
CONCERNED THAT THE PROPOSED RULE WOULD ADVERSELY
IMPACT THE RECYCLING INDUSTRY.  EPA'S MAJOR CON-
CERN WITH THE PROPOSED RULEMAKING IS THAT IT DOES
NOT ADEQUATELY RECOGNIZE THE ENVIRONMENTAL,
ECONOMIC, XND ENERGY BENEFITS OF RECYCLING.  IT
IS RECOMMENDED THAT DOE MODIFY THE RULE TO ASSURE
THAT WASTE RESOURCES WILL BE AVAILABLE FOR EXIST-
ING AND POTENTIAL FUTURE RECYCLING PROGRAMS; TO
PROVIDE FOR A COMPREHENSIVE ANALYSIS OF MUNICIPAL
WASTE RECOVERY PROGRAM ALTERNATIVES UNDER THE
NATIONAL ENVIRONMENTAL POLICY ACT; AND TO ASSURE
THAT FUNDED PROJECTS ARE SOUND ON AN ECONOMIC
BASIS AND A NET ENERGY BASIS.
EPA RECOMMENDED THAT THE PROPOSED CATEGORICAL
EXCLUSION BE REVISED TO APPLY ONLY WHEN THE GRANT
OF THE ENTITLEMENT FOR PETROLEUM SUBSTITUTES
RESULTS IN NO INCREASE IN THE AMOUNT OF ANY AIR
POLLUTANT EMITTED, NOR AN EMISSION OF ANY AIR
POLLUTANT NOT PREVIOUSLY EMITTED.
                                        EPA SUPPORTS USGS1S ATTEMPT TO ESTABLISH SAFETY
                                        REQUIREMENTS FOR HUMANS AND THE MARINE ENVIRON-
                                        MENT.  EPA HAS CONCERNS REGARDING THE DISCUSSION
                                        OF IMPACTS FROM DRILLING DISCHARGES AND OIL SPILLS.
DEPARTMENT OF TRANSPORTATION
 A-DOT-A89150-00
NOTICE NO. 80-17, FINAL POLICY AND
PROPOSED GUIDELINES ON CITIZEN PARTI-
CIPATION IN LOCAL TRANSPORTATION
PLANNING, NOTICE AND REQUEST FOR
PUBLIC COMMENT ON PROPOSED GUIDE-
LINES (45 FP 71938>
                                                             EPA COMMENDED THE SCOPE AND OBJECTIVES OF DOT
                                                             CITIZEN PARTICIPATION PROGRESS BUT SUGGESTED
                                                             FIRMER WORDING IN THE GUIDELINES TO INSURE
                                                             EFFECTIVE IMPLEMENTATION../EPA ALSO SUGGESTED
                                                             FURTHER MEANS TO IMPROVE COMMUNICATION OF
                                                             ENVIRONMENTAL INFORMATION TO CITIZENS.

-------
    IDCNTIPYING
      NUMDER
                               TITLE
                                                             GENERAL  NATURE OF COMMCNTS
                                                                                          yOUKi'K  FOR
                                                                                          COPILS  OF
                                                                                           COMMENTS
  A-FHW-D40109-PA
 AIR QUALITY WORK PROGRAM, L.R. '1039,
 SECTION 4, ALLEGHENY COUNTY,
 PENNSYLVANIA
  A-FHW-D40110-MD
 A-FHW-D40111-PA
                      MD-3 CORRIDOR STUDY,  AIR ANALYSIS,
                      ANNE ARUNDEL COUNTY,  MARYLAND
                      ASSESSMENT,  L.R.  48129-A50,  MINSI
                      TRAIL BRIDGE,  BETHLEHEM,  PENNSYLVANIA
DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
 R-HUD-A86176-00
                     24 CFR PART 570  (DOCKET NO.  R-80-887),
                     COMMUNITY DEVELOPMENT BLOCK  GRANTS,
                     COMMUNITY DEVELOPMENT DISASTER ASSIS-
                     TANCE PROGRAM, PROPOSED RULE
                     (45 FR 74940)
NATIONAL CAPITAL PLANNING COMMISSION
 A-NCP-D89027-DC
                     COMPREHENSIVE PLAN FOR NATIONAL
                     CAPITAL, ENVIRONMENTAL ELEMENT,
                     DISTRICT OF COLUMBIA
NUCLEAR REGULATORY COMMISSION
 R-NRC-A00148-00
10 CFR PARTS 50, 51, and 100, EIS
FOR REACTOR SITING CRITERIA, NOTICE
OF INTENT TO PREPARE AN ENVIRONMENTAL
IMPACT STATEMENT FOR REVISION OF THE
REGULATIONS GOVERNING THE SITING OF
EPA HAS NO OBJECTIONS TO THE PROPOSED METHOD OF
ESTIMATING MICROSCALE CARBON MONOXIDE IMPACTS
RESULTING FROM THE FACILITY.  HOWEVER, EPA WOULD
APPRECIATE A BRIEF EXPLANATION OF WHY NO MESOSCALE
ANALYSIS IS DEEMED NECESSARY SINCE PITTSBURGH  IS
A NON-ATTAINMENT AREA FOR TRANSPORTATION RELATED
POLLUTANTS.

EPA EXPRESSED ENVIRONMENTAL RESERVATIONS OVER
PROJECTED VIOLATIONS OF THE 8-HOUR CO STANDARD
IN 1985, AND SUGGESTED MEASURES TO REDUCE THESE
CONCENTRATIONS TO CURRENT STANDARDS.

EPA FINDS THE ASSESSMENT TO BE ADEQUATE AND HAS
NO COMMENTS TO OFFER AT THIS TIME.
                                         THE  EPA  BELIEVES  THE  PROPOSED RULE  WAS  NOT
                                         RESTRICTIVE  ENOUGH.   REBUILDING  IN  THE  FLOOD-
                                         PLAIN, ESPECIALLY IN  AREAS OF HIGH  POTENTIAL
                                         REOCCURRENCE, SHOULD  BE  DISCOURAGED EXCEPT IN
                                         THE  MOST UNUSUAL  CIRCUMSTANCES IN ORDER TO PRO-
                                         TECT ENVIRONMENTALLY  SENSITIVE AREAS AND TO
                                         MINIMIZE UNNECESSARY  LOSSES.   HUD WAS ALSO URGED
                                         TO EXTEND LIKE PROTECTION TO  WETLANDS BY EXPLICITLY
                                         APPLYING THE WETLANDS EXECUTIVE  ORDER  (E.G. 12090)
                                         TO THIS  PROGRAM.
                                        EPA FEELS THE DOCUMENT WILL HELP TO PROVIDE A
                                        SOUND ENVIRONMENTAL BASIS FOR FUTURE PLANNING
                                        WORK IN THE NATIONAL CAPITAL REGION.
                                                             EPA SUPPORTS NRC'S INTENT TO REVIEW REACTOR SITING
                                                             CRITERIA.   EPA BELIEVES NRC'S FUTURE EIS SHOULD
                                                             DISCUSS THE COMPATIBILITY dF SITING GOALS AND AL-
                                                             TERNATIVES WITH NRC'S SAFETY POLICY.  EPA RECOMMENDS
                                                             THAT NRC CRITEFIA FOR SITING BE COMPARED WITH

-------
                                                                                                           SOURCI: FOR
IDENTIFYING                                                                                                COPIES OF
  NUMBER	TITLE	GENERAL  NATURE  OF  COMMENTS	COMMENTS

                  NUCLEAR POWER PLANTS (45 FR 79820)      ENVIRONMENTAL CRITERIA, TO DETERMINE THE DEGREE
                                                          TO WHICH THE CRITERIA FOR SITING AND ENVIRONMENT
                                                          CONFLICT.
                                                                                                                        i
                                                                                                                        M
                                                                                                                        -J

-------
                                                -18-
                                SOURCE FOR COPIES OF EPA COMMENTS
/..   Office of Federal Activities  (A-J04)

     Environmental Protection Agency

     Room 2119  Waterside Mall,  SW

     Washington, D.C.  20460


B.   Director of Public  Affairs, Region  1

     Environmental Protection Agency

     John F. Kennedy Federal Building

     Boston, Massusetts   02203


 C.   Director  of  Public  Affairs, Region 2

      Environmental Protection Agency

      26 Federal Plaza

      New York, New York ~ 10007


 D.   Director of Public Affairs,  Region 3

      Environmental Protection Agency

      Curtis Building, 6th and Walnut Streets

      Philadelphia, Pennsylvania  19106


  E.   Director of Public Affairs,  Region 4

      Environmental  Protection  Agency

      345 Courtland  Street, NE

      Atlanta,  GA  30308


  F.   Director of Public Affairs,  Region 5

       Environmental Protection Agency

       230 South Dearborn Street

       Chicago, Illinois  60604
G.   Director  of  Public Affiars, Region 6

     Environmental Protection  Agency

     1201 Elm  Street

     Dallas, Texas  75270


H.   Director  of  Public  Affairs, Region  7

     Environmental Protection Agency

      324  East llth Street

     Kansas City, Missouri  64108


 I.   Director  of Public Affairs, Region 8

     Environmental Protection Agency

      1860 Lincoln  Street

      Denver,  Colorado  80203


 J-    Office of External  Affairs,  Heaion 9

      Environmental Protection Agency

      215  Fremont Street

      San Francisco, California  94108


  K.   Director of Public Affairs,  Region 10

      Environmental Protection Agency

      1200 Sixth Avenue

      Seattle, Washington  98101

-------
 STATE
                  COUNTY
                                               ENVIRONMENTAL PROTECTION AGENCY
                                                     JANUARY   1981
                                         STATEMENT TITLE INDEX - BY STATE AND COUNTY
                                       STATUS
                                          STATEMENT  TITLE
                                        DRAFT  DECOMMISSIONING  OF  NUCLEAR  FACILITIES
                                        FINAL  MOTORCYCLE  NOISE EMISSION REGULATIONS
ACCESSION   DATE
  NUMBER    FILED

  810068  01-29-81
  610000  01-02-81
                                                                                                   ORIG AGENCY
                                                                                                      NUMBER

                                                                                                    NRC
                                                                                                    EPA
 ALABAMA
                  SEVERAL
                  LIMESTONE

                  MADISON
                      FINAL  SOUTHERN  APPALACHIAN REGIONAL COAL LEASING
                      FINAL  1-565,  1-65  TO OAKWOOD  AVE/ANOREH JACKSON HAY F-2
  810035  01-16-81
  810056  01-21-81
                                       FINAL  1-565,  1-65  TO  OAKHOOD  AVE/ANDREM JACKSON NAY  F-2   810056   01-21-81
DOI
DOT

DOT
 ALASKA
                                       DRAFT BETHEL SMALL BOAT HARBOR,  IMPROVEMENT               B10072  01-23.81
                                       FINAL SOUTH FAIRBANKS EXPRESSWAY                          810020  01-12-81
                                       SUPPLESNETTISHAM HYDROELECTRIC PROJECT, CRATER LAKE DS-1  810059  01-22-81
                                       SUPPLEHIGH SEAS SALMON FISHERY FMP  (06-2)                 810091  01-30-81
                                                                                                   COE
                                                                                                   DOT
                                                                                                   COE
                                                                                                   DOC
ARKANSAS
SEVERAL
                                       FINAL NHITE RIVER NAVIGATION, BATESVILLE TO MISS. RIVER   810012  01-16-81   COE
ATLANTIC OCEAN
                                       DRAFT SPINY LOBSTER FMP REGULATORY ANALYSIS               810039  01-16-81   DOC
                                       FINAL 1961 OC8 OIL/GAS LEASE SALE * 56, SOUTH ATLANTIC    810063  01-22-81   DOI
                                                                                                                 vo
CALIFORNIA
SEVERAL
MODOC
SAN DIEGO

SANTA CLARA
SISKIVOU
                                       FINAL LASSEN VOLCANIC NATIONAL PARK                       810067  01-23-81
                                       FINAL MOUNT DOME PLANNING UNIT LIVESTOCK GRAZING MGMT.    810005  01-06-81
                                       FINAL E. SAN DIEGO CO. PLANNING UNIT, GRAZING MANAGEMENT  810006  01-06-81
                                       SUPPLE8AN ONOFRE NUCLEAR GENERATING STATION (DS-1)        810038  01-16-81
                                       DRAFT UVAS CREEK FLOOD PROTECTION PLAN, GILROY            810007  01-06-81
                                       FINAL MOUNT DOME PLANNING UNIT LIVESTOCK GRAZING MGNT.    810005  01-06-81
                     DOI
                     DOI
                     DOI
                     NRC
                     COE
                     001
COLORADO
EL PASO
LAS ANIMAS
PITKIN
PUEBLO
                                       FINAL U.S. HIGHWAY 24 BYPASS, COLORADO SPRINGS            810047  01-19-81   DOT
                                       FINAL FORT CARSON, TRAINING LAND ACQUISITION              810041  01-12-81   USA
                                       DRAFT LITTLE ANNE SKI AREA DEVELOPMENT, ASPEN             810048  01-21-81   USDA
                                       FINAL PUEBLO DOHNTOHN HOTEL/CONVENTION CENTER, UDAG       610010  01-07-81   HUD
                                       FINAL FORT CARSON, TRAINING LAND ACQUISITION              810041  01-12-81   USA
FLORIDA
SEMINOLE
                                       FINAL GREENNOOD LAKES PLANNED UNIT DEVELOPMENT
                                                                                810031  01-14-81   HUD

-------
STATE


GEORGIA
COUNTY


RICHMOND
COLUMBIA
CHATTAHOOCHEE

MUSCOGEE
        ENVIRONMENTAL PROTECTION AGENCY

  STATEMENT TITLE INDEX • BY STATE AND COUNTY

STATUS              STATEMENT TITLE
ACCESSION
  NUMBER
DATE
FILED
 FINAL AUGUSTA RAILROAD DEMONSTRATION PROJECT              eioo92  oi-aa-ei
 FINAL AUGUSTA RAILROAD DEMONSTRATION PROJECT              810092  01-28-81
 DRAFT FORT BENNING ONGOING SITING AND MISSION ACTIVITIES  810087  01-29-81
ORIG AGENCY
   NUMBER

 DOT
 DOT
 USA
                                       DRAFT FORT BENNING ONGOING SITING AND MISSION ACTIVITIES  810087  01-29-81   USA
GULF OF MEXICO
                      DRAFT SPINY LOBSTER FMP REGULATORY ANALYSIS
                      DRAFT GROUNDFISH FISHERY FMP REGULATORY ANALYSIS
                                                           810039  01-16-81   DOC
                                                           810040  01-16-81   DOC
IDAHO
KOOTENAI
                                       DRAFT CITY OF COEUR D'ALENE NNT FACILITIES* GRANT
                                                                                810012  01-07-81   EPA
INDIANA
KANSAS
KENTUCKY
LOUISIANA
MARYLAND
ADAMS
STEUBEN
LABETTE
MARION
MYANDOTTE
                 DAVIESS
SEVERAL
CALCASIEU
CAMERON
JEFFERSON DAVIS
ORLEANS
ST. JOHN BAPTIST
ST.JAMES
ANNE ARUNOEL

PRINCE GEORGES
 DRAFT US 27 BYPASS OF DECATUR
 FINAL STEUBEN LAKES MNT SYSTEMS. CASE STUDY «4
 DRAFT LABETTE CREEK LOCAL FLOOD PROTECTION, PARSONS
 FINAL MARION COUNTY SEWERAGE FACILITIES. GRANT
 DRAFT GENERAL MOTORS ASSEMBLY PLANT RELOCATION, UDAG
                      DRAFT OHIO RIVER BRIDGE CONSTRUCTION •
                      DRAFT SOLVENT REFINED COAL-1 DEMONSTRATION PROJECT
 DRAFT DEEP DRAFT ACCESS TO LA PORTS, MISSISSIPPI RIVER
 DRAFT BELL CITY WATERSHED PROTECTION
 DRAFT BELL CITY WATERSHED PROTECTION
 DRAFT BELL CITY WATERSHED PROTECTION
 FINAL 1-510 SPUR, GULF OUTLET BRIDGE TO 1-10
 FINAL MISSISSIPPI RIVER BRIDGE, GRAMERCV TO WALLACE
 FINAL MISSISSIPPI RIVER BRIDGE, GRAMERCY TO WALLACE
 DRAFT US 50/301, I-9S TO VICINITY OF SOUTH RIVER BRIDGE
 FINAL 1-97, BALTIMORE/ANNAPOLIS CORRIDOR STUDY
 DRAFT US 50/301, I-«5 TO VICINITY OF SOUTH RIVER BRIDGE
810010
810054
810089
810013
810090
810050
810017
810045
810027
810027
810027
810051
810060
810060
810077
810079
810077
01-08-81
01-21-81
01-29-81
01-07-81
01-30-81
01-21-81
01-09-81
01-21-81
01-13-81
01-13-81
01-13-81
01-27-81
01-22-81
01-22-81
01-26-61
01-26-81
01-26-81
DOT
EPA
COE
EPA
HUD
DOT
DOE
COE
USDA
USDA
USDA
DOT
DOT
DOT
DOT
DOT
DOT
                                                                                                                                 10
                                                                                                                                 O

-------
STATE
COUNTY
MASSACHUSETTS    WORCESTER
        ENVIRONMENTAL PROTECTION A6ENCV

  STATEMENT TITLE INDEX - BY STATE AND COUNTY

STATUS              STATEMENT TITLE


 FINAL FORT DEVENS ONGOING MISSION, CONTINUANCE
                                                                                               ACCESSION
                                                                                                 NUMBER
                                                                                          DATE
                                                                                          FILED
          ORIG AGENCY
             NUMBER
                                                                                                 810073  01-22-81   USA
MICHIGAN
HURON
OAKLAND
WEXFORD
                                       DRAFT HARBOR BEACH MAINTENANCE DREDGING/DISPOSAL* PERMIT  610034
                                       FINAL 1-696, LAHSER ROAD TO 1-75                          810049
                                       DRAFT TONER MOUNTAIN AREA, HURON-NANI8TEE NF              810030
                                                                   01-16-81    COE
                                                                   01-21-81    DOT
                                                                   01-14-81    USDA
MINNESOTA
BLUE EARTH
KANDIYOHI
 8UPPLEMANKATO-N. MANKATO-LE HILLIER FLOOD CONTROL D8-2    810003  01-05-81   COE
 FINAL GREEN LAKE NASTE TREATMENT SYSTEMS, CASE STUDY *2   610036  01-16-81   EPA
NEVADA
ELKO
HASHOE
NEW HAMPSHIRE    CHESHIRE
 FINAL HILDHORSE RESERVOIR AND LANDS,  RECREATIONAL LEASE
 SUPPLEUS 395,  WINTERS'  RANCH TO SOUTH VIRGINIA 8T/I-580
                      FINAL CONNECTICUT RIVER BRIDGE CROSSING
                                                                                                 610009
                                                                                                 810076
01-06-81
01-26-81
DOI
DOT
                                                                                                                                 I
                                                                                                                                 to
                                                                                                 810052  01-21-81   DOT
NEW JERSEY
MORRIS
SOMERSET
UNION
 DRAFT UPPER ROCKAHAY RIVER BASIN,  FACILITY PLAN
 FINAL 1-78 COMPLETION,  1-78 TO BALTUSROL ROAD
 FINAL 1.78 COMPLETION,  I-re TO BALTUSROL ROAD
                                                                                                 810084
                                                                                                 810018
                                                                                                 eiooie
01-28-81
01-29-81
01-29-81
EPA
DOT
DOT
NEW MEXICO
BERNALILLO
CURRY
ROOSEVELT
BAN JUAN
 FINAL MESTGATE HEIGHTS SUBDIVISION,  ALBUQUERQUE
 DRAFT US 70 IMPROVEMENTS,  PORTALES-CLOVIS SECTION
 DRAFT US 70 IMPROVEMENTS,  PORTALES-CLOVIS SECTION
 FINAL UTE MOUNTAIN STRIP COAL MINE LEASE
                                                                                                 810085
                                                                                                 810001
                                                                                                 810001
                                                                                                 810068
01-28-81
01-02-81
01-02-81
01-23-81
HUD
DOT
DOT
DOI
NEH YORK
ALBANY
CHEMUNG
NIAGARA
ONONDAGA
RICHMOND
SCHUYLER
 FINAL LATHAM-MOHAWK RIVER INTERCHANGE,  ALTERNATE ROUTE 7  810053  01-21-81    DOT
 DRAFT NEHTON-HOFFMAN WATERSHED,  FLOOD PROTECTION          810086  01-29-81    USDA
 FINAL SOMERSET RAILROAD,  CONSTRUCTION AND OPERATION       810043  01-16-81    ICC
 FINAL 1-481  EXTENSION,  COLLAMER  TO BEAR ROAD              810081  01-27-81    DOT
 DRAFT ARTHUR KILL FOSSIL  FUELED  POWER PLANT, PERMIT       810023  01-12-81    COE
 DRAFT NEWTON.HOFFMAN WATERSHED,  FLOOD PROTECTION          810086  01-29-81    USDA

-------
STATE
COUNTY
NORTH CAROLINA   CAHDEN
                 ROBESON
        ENVIRONMENTAL PROTECTION AGENCY

  STATEMENT TITLE INDEX • BY STATE AND COUNTY

STATUS              STATEMENT TITLE
                      FINAL JOYCE CREEK FLOOD CONTROL PROJECT
                      DRAFT MOSS NECK NATERSHED FLOOD PROTECTION
ACCESSION
  NUMBER
DATE
FILED
                                                           810002  01-02-81
                                                           810083  01-28-81
ORIG AGENCY
   NUMBER

 COE
 USDA
OHIO
                      DRAFT OHIO RIVER BRIDGE CONSTRUCTION
                                                           810050  01-21-81   DOT
OREGON
PACIFIC OCEAN
PROGRAMMATIC
REGULATORY
BENTON
DESCHUTES
MULTNOMAH
 FINAL CIRCLE BOULEVARD* IMPROVEMENT/EXPANSION
 FINAL BEND CITY SEWAGE EFFLUENT DISPOSAL
 8UPPLEI-505, NM NICOLAI 8TRE.ET TO 1-405, PORTLAND
                      DRAFT INCIDENTAL TAKE OF OALL PORPOISE
                      8UPPLE8ALMON COMMERCIAL/RECREATIONAL FMP, AMENDMENT DS-3
                      SUPPLEHIGH SEAS SALMON FISHERY FMP (DS-2)
                      FINAL BPA ROLE IN PACIFIC NN PQMER SUPPLY SYSTEM
                      SUPPLEMULTIFAMILY AND COMMERCIAL BUILDINGS, RC8P, (DS-1)
                      DRAFT BENZENE STORAGE TANK EMISSIONS, STANDARDS
                      DRAFT ACREAGE LIMITATION, RECLAMATION ACT OF 1902
                      DRAFT SYNTHETIC ORGANIC CHEMICALS EMISSIONS, STANDARDS
                      DRAFT INDUSTRIAL SURFACE COATING-APPLIANCES, STANDARDS
                      DRAFT BENZENE FUGITIVE EMISSIONS, STANDARDS
                      DRAFT PERCHLOROETHYLENE DRY CLEANER EMISSION STANDARDS
                      DRAFT SPINY LOBSTER FMP REGULATORY ANALYSIS
                      DRAFT GROUNDFI8H FISHERY FMP REGULATORY ANALYSIS
                      DRAFT METAL COIL SURFACE COATING INDUSTRY, EMISSIONS
                      DRAFT TAPE AND LABEL SURFACE COATING INDUSTRY, STANDARDS
                      FINAL OCCUPATIONAL NOISE EXPOSURE STANDARDS, AMENDMENT
                      FINAL AUTO/LIGHT-DUTV TRUCK SURFACE COATING OPERATIONS
810026
810025
810037
810033
810069
810091
810065
810094
810011
810015
810021
810022
810028
810029
810039
810040
810044
810057
810008
810046
01-13-81
01-13-81
01-16-81
01-16-81
01-23-81
01-30-81
01-23-81
01-30-81
01-07-81
01-08-81
01-12-81
01-12-81
01-14-81
01-14-81
01-16-81
01-16-81
01-19-81
01-22-81
01-06-81
01-19-81
DOT
EPA
DOT
DOC
DOC
DOC
DOE
DOE
EPA
DO!
EPA
EPA
EPA
EPA
DOC
DOC
EPA
EPA
DLAB
EPA
                                                                                                                                I
                                                                                                                               10
                                                                                                                               to
                                                                                                                                I
RHODE ISLAND     KENT
                      DRAFT, BIG RIVER RESERVOIR MATER RESOURCES DEVELOPMENT
                                                           810061  01-22-81   COE
SEVERAL
                 SEVERAL
                      DRAFT DOMINOUEZ-E8CALANTE NATIONAL HISTORIC TRAIL
                                                                                                 810082  01-28-81   DOI

-------
                                              ENVIRONMENTAL PROTECTION AGENCY

                                        STATEMENT TITLE INDEX - BY STATE AND COUNTY
STATE
COUNTY
30UTH CAROLINA   AI KEN
                 CHARLESTON
TEXAS
UTAH
VERMONT
VIRGINIA
WASHINGTON
BEXAR
TARRANT
TARRENT
UINTAH
                 WINDHAM
FAIRFAX
PRINCE WILLIAM
FERRY
PIERCE
THURSTON
                                      STATUS
                   STATEMENT TITLE
                      FINAL AUGUSTA RAILROAD DEMONSTRATION PROJECT
                      DRAFT POST OFFICE AND COURTHOUSE RENOVATION, CHARLESTON
                      FINAL ISLE OF PALMS CONNECTOR, SC-703 TO US 17/701
DRAFT SAN ANTONIO AREANIOE STUDY
FINAL FAIRFIELD SUBDIVISION MORTGAGE INSURANCE
DRAFT WINDMILL MEADOWS/LYNN CREEK ESTATES SUBDIVISION
DRAFT MOON LAKE POWER UNITS 1 AND 2. RIGHT-OF-WAY
                      FINAL CONNECTICUT RIVER BRIDGE CROSSING
FINAL DULLES ACCESS HIGHWAY .EXTENSION, 1-66 INTERCHANGE
DRAFT RIPPON LANDING DEVELOPMENT, MORTGAGE INSURANCE
FINAL ROUTE 234 BYPASS CONSTRUCTION, MANASSA8
DRAFT MT. TOLMAN OPEN PIT COPPER-MOLYBDENUM MINE* LEASE
FINAL GEM HEIGHTS DEVELOPMENT MORTGAGE INSURANCE
DRAFT THE MEAOOHS DEVELOPMENT, MORTGAGE INSURANCE
FINAL HA.5, TROSPER ROAD TO MARTIN NAY INTERCHANGE
ACCESSION
NUMBER
8100«J2
810020
610055
810060
810093
81009S
810016
810052
810061
B10058
810078
810071
810032
6I007S
810066
DATE
FILED
01-28-81
01-23-81
01-21-81
01-27-81
01-28-81
01-06-81
01-08-81
01-21-81
01-23-81
01-22-81
01-26-81
01-23-81
01-15-81
01-26-81
01-23-81
ORIG AGENCY
NUMBER
DOT
GSA
DOT
HUD
HUD
HUD
DOI
DOT
DOT
HUD
DOT
DOI
HUD
HUD
DOT
                                                                                                                                to
                                                                                                                                U)
                                                                                                                                 I
WEST VIRGINIA    MONON6ALIA
                      FINAL SCR-II DEMONSTRATION PROJECT, FORT MARTIN
                                                          810062  01-22-81   DOE
WYOMING
CAMPBELL
FINAL ROJO CA8ALLOS NINE RECLAMATION PLAN
81007a  01-27-81   DOI

-------
                              JANUARY 1981
                                                   ENVIRONMENTAL PROTECTION AGENCY
                                         STATEMENT TITLE INDEX • BY AGENCY, BUREAU, & STATUS
AGENCY
    BUREAU

DEPARTMENT OF AGRICULTURE
    FOREST SERVICE
    SOIL CONSERVATION SERVICE
STATUS
                                                              STATEMENT TITLE
ACCESSION
  NUMBER
 DRAFT  TONER MOUNTAIN AREA, HURON-MANISTEE NF
        LITTLE ANNE SKI AREA DEVELOPMENT, ASPEN

 DRAFT  BELL CITY WATERSHED PROTECTION
        NEWTON-HOFFMAN WATERSHED, FLOOD PROTECTION
        MOSS NECK WATERSHED FLOOD PROTECTION
DATE
FILED
  810030  01-10-81
  810048  01-21-81

  810027  01-13-81
  810086  01*29-81
  810083  01-28-81
NTIS ORDER
  NUMBER
         (NONE)
         (NONE)

         (NONE)
         (NONE)
         (NONE)
DEPARTMENT OF COMMERCE
    NAT'L OCEANIC AND ATMOSPHERIC ADMIN.
DEPARTMENT OF DEFENSE, ARMY
DEPARTMENT OF ENERGY
    BONNEVILLE POWER ADMINISTRATION
                                          DRAFT  INCIDENTAL TAKE OF DALL PORPOISE
                                                 SPINY LOBSTER FMP REGULATORY ANALYSIS
                                                 GROUNDFISH FISHERY FMP REGULATORY ANALYSIS
                                          SUPPLEM3ALMON COMMERCIAL/RECREATIONAL FMP, AMENDMENT DS-3
                                                 HIGH SEAS SALMON FISHERY FMP (D8-2)
                                          DRAFT  FORT BENNING ONGOING SITING  AND  MISSION  ACTIVITIES
                                          FINAL  FORT CARSON, TRAINING LAND ACQUISITION
                                                 FORT DEVENS ONGOING MISSION, CONTINUANCE
 DRAFT  SOLVENT REFINED COAL-1 DEMONSTRATION PROJECT
 FINAL  SCR-II DEMONSTRATION 'PROJECT, FORT MARTIN
 SUPPLEMMULTIFAMILY AND COMMERCIAL BUILDINGS, RCSP,  CDS-1)

 FINAL  BPA ROLE  IN PACIFIC NW POWER SUPPLY SYSTEM
810033
810039
810000
810069
810091
810067
810001
810073
810017
810062
810090
01-16-81
01-16*81
01-16-81
01-23-81
01-30-81
01-29-81
01-12-81
01*22-81
01-09-81
01-22-81
01-30-81
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
                                                                                             I
                                                                                            M
  810065   01-23-81
                                                                                                                         (NONE)
DEPARTMENT OF HUD
                                           DRAFT   RIPPON  LANDING  DEVELOPMENT,  MORTGAGE  INSURANCE      810058  01-22-01   (NONE)
                                                  THE  MEADOWS  DEVELOPMENT,  MORTGAGE  INSURANCE         810075  01-26-81   (NONE)
                                                  SAN  ANTONIO  AREAWIDE  STUDY                           810080  01-27-81   (NONE)
                                                . WINDMILL  MEADOWS/LYNN CREEK  ESTATES  SUBDIVISION     810095  01-06-81   (NONE)
                                           FINAL   GREENWOOD LAKES PLANNED  UNIT DEVELOPMENT             810031  01-10-81   (NONE)
                                                  GEM  HEIGHTS  DEVELOPMENT  MORTGAGE  INSURANCE          810032  01-15-81   (NONE)
                                                  WESTGATE  HEIGHTS SUBDIVISION,  ALBUQUERQUE            810085  01-28-81   (NONE)
                                                  FAIRFIELD SUBDIVISION MORTGAGE INSURANCE             810093  01-28-81   (NONE)

-------
AGENCY
    BUREAU

DEPARTMENT OF HUD
    SECTION 10fl(H)
STATEMENT TITLE INDEX - BY AGENCY. BUREAU, & STATUS

STATUS               STATEMENT TITLE
                                          DRAFT  GENERAL MOTORS ASSEMBLY PLANT RELOCATION, UDAG
                                          FINAL  PUEBLO DOWNTOWN HOTEL/CONVENTION CENTER, UDAG
ACCESSION
  NUMBER
DATE
FILED
                                                            810090  01-30-81
                                                            810010  01-07-81
NTIS ORDER
  NUMBER
                     (NONE)
                     (NONE)
DEPARTMENT OF INTERIOR

    RUREAU OF INDIAN AFFAIRS



    BUREAU OF LAND MANAGEMENT





    NATIONAL PARK SERVICE


    WATER AND POWER RESOURCES SERVICES
 FINAL  ROJO CABALLOS MINE RECLAMATION PLAN

 DRAFT  MT. TOlMAN OPEN PIT COPPER-MOLYBDENUM MINE* LEASE
 FINAL  WILDHORSE RESERVOIR AND LANDS* RECREATIONAL LEASE
        UTE MOUNTAIN STRIP COAL MINE LEASE

 DRAFT  MOON LAKE POWER UNITS 1 AND 2, RIGHT-OF-WAY
 FINAL  E. SAN DIEGO CO. PLANNING UNIT* GRAZING MANAGEMENT
        MOUNT DOME PLANNING UNIT LIVESTOCK GRAZING KGMT.
        SOUTHERN APPALACHIAN REGIONAL COAL LEASING
        1961 DCS OIL/CAS LEASE SALE * 56, SOUTH ATLANTIC

 DRAFT  DOMINOUEZ-ESCALANTE NATIONAL HISTORIC TRAIL
 FINAL  LASSEN VOLCANIC NATIONAL PARK

 DRAFT  ACREAGE LIMITATION, RECLAMATION ACT OF 1902
  810074  01-27-61   (NOME)
610071
810009
810068
610016
810006
610005
610035
810063
810062
S10067
01.23-81
01-06-81
01-23-81
01-08-61
01-06-81
01-06-81
01-16-61
01-22-81
01-26-81
01-23-81
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONF.)
(NONE)
(NONE)
(NONE)
                                                                                                     610015  01-08-81   (NONE)
                                                                                                                                     to
DEPARTMENT OF LABOR
                                          FINAL  OCCUPATIONAL NOISE EXPOSURE STANDARDS, AMENDMENT
                                                            810008  01-06-81
                     (NONE)
DEPARTMENT OF TRANSPORTATION
    FEDFRAL AVIATION ADMINISTRATION

    FEDERAL HIGHWAY ADMINISTRATION
 FINAL  DULLES ACCESS HIGHWAY EXTENSION, 1-66 INTERCHANGE   610060  01-23-81   (NONE)

 DRAFT  US 70 IMPROVEMENTS, PORTALES-CLOVIS SECTION         810001  01-02-81   (NONE)
        US 27 BYPASS OF DECATUR                             810011  01-08-61   (NONE)
        OHIO RIVER BRIDGE CONSTRUCTION                      810050  01-21-61   (NONE]
        US 50/301, 1-95 TO VICINITY OF SOUTH RIVER BRIDGE   810077  01-26*81   (NONE)
 FINAL  1-78 COMPLETION, 1-78 TO BALTUSROL ROAD             810018  01-29-61   (NONE)
        SOUTH FAIRBANKS EXPRESSWAY                          810020  01-12-61   (NONE)
        CIRCLE BOULEVARD, IMPROVEMENT/EXPANSION                 B10026  01-13-81   (NONE)
        1-696, LAHSER ROAD TO 1-75                          810009  01-21-61   (NONE)
        U.S. HIGHWAY 20 BYPASS, COLORADO SPRINGS            810007  01-19-61   (NONE)
        1-510 SPUR, GULF OUTLET BRIDGE TO 1-10              810051  01-27-81   (NONE)

-------
AGENCY
    BUREAU

DEPARTMENT OF TRANSPORTATION
    FEDERAL HIGHWAY ADMINISTRATION
STATEMENT TITLE INDEX - BY AGENCY* BUREAU, ft STATUS

STATUS               STATEMENT TITLE
                                                  ACCESSION
                                                    NUMBER
    U.S.COAST GUARD
 FINAL  LATHAM.MOHAMK RIVER INTERCHANGE, ALTERNATE ROUTE 7
        CONNECTICUT RIVER BRIDGE CROSSING
        1-565, 1-65 TO OAKMOOO AVE/ANOREN JACKSON HAY F-2
        ISLE OF PALMS CONNECTOR, 8C-703 TO US 17/701
        MA.5, TROSPER ROAD TO MARTIN HAY INTERCHANGE
        ROUTE 234 BYPASS CONSTRUCTION, MANASSA8
        1-97, BALTIMORE/ANNAPOLIS CORRIDOR STUDY
        1-481 EXTENSION, COLLAMER TO BEAR ROAD
        AUGUSTA RAILROAD DEMONSTRATION PROJECT

        1-505, NH NICOLAI STREET TO 1-405, PORTLAND
        US 395, HINTERS1 RANCH TO SOUTH VIRGINIA ST/I-580

 FINAL  MISSISSIPPI RIVER BRIDGE, GRAMERCY TO WALLACE
                                                                                                     810053
                                                                                                     810052
                                                                                                     810056
                                                                                                     810055
                                                                                                     810066
                                                                                                     B10078
                                                                                                     810079
                                                                                                     810081
                                                                                                     810092

                                                                                                     810037
                                                                                                     810076
                        DATE
                        FILED
                                                            01-21-81
                                                            01-21-81
                                                            01-21-81
                                                            01-21-81
                                                            01-23-81
                                                            01-26-81
                                                            01-26-81
                                                            01-27-81
                                                            01-28-81

                                                            01-16-81
                                                            01-26-81
                   NTIS ORDER
                     NUMBER
                                 (NONE)
                                 (NONE)
                                 (NONE)
                                 (NONE)
                                 (NONE)
                                 (NONE)
                                 (NONE)
                                 (NONE)
                                 (NONE)

                                 (NONE)
                                 (NONE)
                                                                                                     810060  01-22-81   (NONE)
ENVIRONMENTAL PROTECTION AGENCY
    EPA, HEADQUARTERS
                                          DRAFT
    EPA, REGION 10


    EPA, REGION 2

    EPA, REGION 5


    EPA, REGION 7
 FINAL


 DRAFT
 FINAL

 DRAFT

 FINAL
BENZENE STORAGE TANK EMISSIONS, STANDARDS
PERCHLOROETHVLENE DRY CLEANER EMISSION STANDARDS
BENZENE FUGITIVE EMISSIONS, STANDARDS
INDUSTRIAL SURFACE COATING-APPLIANCES, STANDARDS
SYNTHETIC ORGANIC CHEMICALS EMISSIONS, STANDARDS
METAL COIL SURFACE COATING INDUSTRY, EMISSIONS
TAPE AND LABEL SURFACE COATING INDUSTRY, STANDARDS
MOTORCYCLE NOISE EMISSION REGULATIONS
AUTO/LIGHT-DUTV TRUCK SURFACE COATING OPERATIONS
CITY OF COEUR D'ALENE WWT FACILITIES)
BEND CITY SEWAGE EFFLUENT DISPOSAL
GRANT
UPPER ROCKAWAV RIVER BASIN, FACILITY PLAN

GREEN LAKE HASTE TREATMENT SYSTEMS, CASE STUDY «2
STEUBEN LAKES WWT SYSTEMS, CASE STUDY 04
810011
810029
810028
810022
810021
810044
810057
810000
810046

810012
810025
              810036
              810054
01-07-81
01-14-81
01-14-81
01-12-81
01-12-81
01-19-81
01-22-81
01-02-81
01-19-81

01-07-81
01-13-81
        01-16-81
        01-21-81
(NONE)
(NONE)
(NONE)
(NONE)
CNONFJ
(NONE)
(NONE)
(NONE)
(NONE)

(NONE)
(NONE)
              810084  01-28-81   (NONE)
           (NONE)
           (NONE)
                                          FINAL  MARION COUNTY SEWERAGE FACILITIES, GRANT
                                                            810013  01-07-81   (NONE)

-------
                                         STATEMENT TITLE INDEX - BY AGENCY, BUREAU, ft STATUS
AGENCY
    BUREAU

GENERAL SERVICES ADMINISTRATION
STATUS
STATEMENT TITLE
                                                          ACCESSION   DATE
                                                            NUMBER    FILED
                                                          NTI3 ORDER
                                                            NUMBER
                                          DRAFT  POST OFFICE AND COURTHOUSE RENOVATION, CHARLESTON   810020  01-23-61    (NONE)
INTERSTATE COMMERCE COMMISSION
                                          FINAL  SOMERSET RAILROAD, CONSTRUCTION AND OPERATION
                                                            810013  01-16-81   (NONE)
NUCLEAR REGULATORY COMMISSION
U.S. ARMY CORPS OF ENGINEERS
                                          DRAFT  DECOMMISSIONING OF NUCLEAR FACILITIES
                                          8UPPLEMSAN ONQPRE NUCLEAR GENERATING STATION (DS-1)
                                          DRAFT  UVAS CREEK FLOOD PROTECTION PLAN, GILROY
                                                 ARTHUR KILL FOSSIL FUELED POWER PLANT, PERMIT
                                                 HARBOR BEACH MAINTENANCE DREDGING/DISPOSAL, PERMIT
                                                 DEEP DRAFT ACCESS TO LA PORTS, MISSISSIPPI RIVER
                                                 BIG RIVER RESERVOIR WATER RESOURCES DEVELOPMENT
                                                 BETHEL SMALL BOAT HARBOR, IMPROVEMENT
                                                 LABETTE CREEK LOCAL FLOOD PROTECTION, PARSONS
                                          FINAL  JOYCE CREEK FLOOD CONTROL PROJECT
                                                 NHITE RIVER NAVIGATION, BATESVILLE TO MISS. RIVER
                                          SUPPLEMMANKATO-N. MANKATO-LE HILLIER FLOOD CONTROL D8-2

                                                 SNETTI8HAM HYDROELECTRIC PROJECT, CRATER LAKE DS-1  810059  01-22-81   (NONE)
810068
810036
B10007
610023
B10034
810045
810061
810072
810069
810002
810042
810003
01-29-61
01-16-61
01-06-81
01-12-81
01-16-81
01-21-61
01-22-81
01-23-81
01-29-81
01-02-81
01-16-81
01-05-61
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
(NONE)
                                                                                          KJ
                                                                                          ~J
                                                                                          I

-------
                         ENVIRONMENTAL PROTECTION AGENCY
                                  JANUARY, 1981

                              102 STATEMENT SUMMARY
AGENCY
DEPARTMENT OF AGRICULTURE


DEPARTMENT OF COMMERCE


DEPARTMENT OF DEFENSE, ARMY


DEPARTMENT OF ENERGY


DEPARTMENT OF HUD


DEPARTMENT OF INTERIOR


DEPARTMENT OF LABOR


DEPARTMENT OF TRANSPORTATION


ENVIRONMENTAL PROTECTION AGENCY





GENERAL SERVICES ADMINISTRATION


INTERSTATE COMMERCE COMMISSION


NUCLEAR REGULATORY COMMISSION


U.S. ARMY CORPS OF ENGINEERS
                                     TOTALS
DRAFT 102*3
(NO FINAL)
s
3
1
1
5
4
0
a
9
1
0
1
7
s ai
FINAL 102'S
0
0
2
2
S
8
1
17
6
0
1
0
2
OH
SUPPLEMENTS
0
2
0
1
0
0
0
2
0
0
0
1
2
8
TOT
5
S
3
a
10
12
1
23
15
1
1
2
11
93
to
00

-------
                              -29-

              U.5. ARMY CORPS OF ENGINEERS

CONTACTS      MR. RICHARD MAKINEN
              OFFICE OF THE CHIEF OF ENGINEERS
              ATTNt  DAEN-CWR-P
              OFFICE OF THE CHIEF OF ENGINEERS
              U.S. ARMV CORPS OF ENGINEERS
              20 MASSACHUSETTS AVENUE
              WASHINGTON* O.C.  20514
              (202) 272-0121


DRAFT                                                      DATE

    BETHEL SMALL BOAT HARBOR, IMPROVEMENT                  01/23

    ALASKA
    PROPOSED IS THE IMPROVEMENT OF THE BETHEL SMALL-BOAT HARBOR*
    ALASKA.  THE PREFERRED ALTERNATIVE NOULD INVOLVE!  1)
    DREDGING SIX ACRES OF EXISTING SLOUGH AND BULLDOZING AN
    ADDITIONAL SIX ACRES TO A DEPTH OF FOUR FEET BELOW MEAN
    LONER LOW WATER* 2) DISPOSAL OF 124,000 CUBIC YARDS OF
    EXCAVATED MATERIAL ON APPROXIMATELY 20 ACRES EAST OF THE
    BASIN* AND 33 PROVISIONS FOR ACCESS AND BASIN SERVICES.
    THIS ALTERNATIVE NOULD PROVIDE FOUR BOAT BASINS TO HOUSE
    1,200 RIVERBOAT8,
    (ALASKA DISTRICT)
    (EI8 ORDER 0 610072)


    UVAS CREEK FLOOD PROTECTION PLAN, GILROY               01/06

    CALIFORNIA
    COUNTYl        SANTA CLARA
    PROPOSED IS A FLOOD CONTROL PLAN FOR UVAS CREEK LOCATED
    ALONG THE CITY OF GILROY* SANTA CLARA COUNTY* CALIFORNIA.
    THE PREFERRED ALTERNATIVE CONSISTS OFl  1) A NEW OR RECON.
    8TRUCTED LEVEE ALONG THE NORTH SIDE OF THE CREEK, SETBACK
    WHEREVER POSSIBLE! 2) RECONSTRUCTION OF ABOUT 1,000 FEET OF
    EXISTING LEVEE DOWNSTREAM OF MILLER AVENUE* 3) RAISING OF
    UP TO 1,000 FEET OF LEVEE UPSTREAM OF MILLER AVENUEf 
-------
                               -30-


    THE COOPERATING AGENCY  IS  THE FWS.
    (TULSA DISTRICT)
    (EIS ORDER « 810069)
DRAFT                                                       DATE

    DEEP DRAFT ACCESS TO LA PORTS, MISSISSIPPI  RIVER        01/21

    LOUISIANA
    COUNTYl        SEVERAL
    PROPOSED IS THE IMPROVEMENT OF DEEP-DRAFT NAVIGATION
    APPROACHES FROM THE MISSISSIPPI RIVER  TO THE  PORTS  OF  NEW
    ORLEANS AND BATON ROUGE, LOUISIANA.  THE PREFERRED  ALTER-
    NATIVE MOULD INVOLVE THE DREDGING OF A LARGER DEEP  DRAFT
    NAVIGATION APPROACH IN  THE MISSISSIPPI RIVER  EXTENDING TO
    BATON ROUGE VIA THE SOUTHWEST PASS AND A TURNING  BASIN AT
    THE UPSTREAM END OF THE ENLARGED CHANNEL.   FIVE OTHER
    ALTERNATIVES ARE CONSIDERED.  ELEVEN PARISHES OF  LOUISIANA
    WOULD BE AFFECTED BY THE PROJECT,
    (NEW ORLEANS DISTRICT)
    (EIS ORDER * 810045)


    HARBOR BEACH MAINTENANCE DREDGING/DISPOSAL, PERMIT      01/16

    MICHIGAN
    COUNTYl        HURON
    PROPOSED IS THE ISSUANCE OF A PERMIT FOR MAINTENANCE
    DREDGING IN LAKE HURON, OFFSHORE OF THE HARBOR BEACH POWER
    PLANT, AND THE DISPOSAL OF DREDGE MATERIALS IN A  LOW-
    LYING WETLAND AREA INLAND  FROM LAKE HURON,  IN HURON COUNTY,
    MICHIGAN.  THE ALTERNATIVES CONSIDERED ARE:   1) OPEN WATER
    DISPOSAL, 2) USE OF VARIOUS DIKED DISPOSAL  SITES,. 3) ARTI-
    FICIAL HABITAT CREATION, 4) PLACEMENT OF DREDGED MATERIAL ON AGRICUL-
    TURAL LAND, 5) VARIOUS DREDGING METHODS, AND  6) NO ACTION.
    (DETROIT DISTRICT)
    (EIS ORDER # 810034)
    ARTHUR KILL FOSSIL FUELED  POWER  PLANT,  PERMIT          01/12

    NEW YORK
    COUNTY!        RICHMOND
    PROPOSED IS .THE  ISSUANCE OF  A  PERMIT  FOR  THE CONSTRUCTION
    OF A 700 MW FOSSIL FUELED  POWER  PLANT AT  THE ARTHUR KILL
    NEAR TRAVIS TO STATEN  ISLAND,  RICHMOND COUNTY,  NEW YORK.  IN
    ADDITION TO NO ACTION  TWO  OTHER  LOCATION  ALTERNATIVES FOR
    PLANT CONSTRUCTION ARE CONSIDERED  WHICH ARE!  1)  THE QUARRY
    SITE IN DUTCHESS COUNTY, AND 2)  THE ATHENS SITE IN GREENE
    COUNTY.  THE COOPERATING AGENCY  IS DOE,
    (NEW YORK DISTRICT)
    (EIS ORDER n 810023)

-------
                               -31-
 DRAFT                                                      DATE

    BIG RIVER RESERVOIR WATER RESOURCES DEVELOPMENT                01/22

    RHODE ISLAND
    COUNTY:       KENT

    PROPOSED IS A WATER RESOURCES DEVELOPMENT AND MANAGEMENT
    PLAN FOR THE BIG RIVER RESERVOIR AREA OF THE TOWNS OF
    COVENTRY AND WEST GREENWICH* KENT COUNTY, RHODE ISLAND.  THE
    PREFERRED ALTERNATIVE WOULD INVOLVE!  i) CONSTRUCTION OF
    THE RESERVOIR, 2) DEMAND CONSERVATION, 3) LESS INTENSIVE
    DEVELOPMENT OF GROUNDWATER FOR THE PROVIDENCE AREA* 4)
    FACILITIES TO DELIVER WATER FROM THE BRISTOL COUNTY AREA TO
    MEET THE NEEDS OF THE BRISTOL COUNTY SYSTEM, 5) FLOOD DAMAGE
    REDUCTION MEASURES, AND 6) RECREATIONAL DEVELOPMENT.  THE
    COOPERATING AGENCY IS THE FW8.
    (NEW ENGLAND DIVISION)
    (EIS ORDER * 810061)


FINAL                                                      DATE

    WHITE RIVER NAVIGATION, BATESVILLE TO MISS. RIVER      01/16

    ARKANSAS
    COUNTYl        SEVERAL
    PROPOSED IS A NAVIGATION PROJECT FOR THE WHITE RIVER FROM
    BATESVILLE TO THE MISSISSIPPI RIVER IN THE COUNTIES OF
    ARKANSAS, WHITE, WOODRUFF, PRAIRE, MONROE, JACKSON, AND
    PHILLIPS, ARKANSAS.  THE NAVIGATION CHANNEL WOULD HAVE A
    DEPTH OF 9 FEET AVAILABLE 95 PERCENT OF THE TIME AND A
    BOTTOM WIDTH OF 200 FEET.  DREDGING WOULD BE REQUIRED AT 154
    LOCATIONS ALONG 56 MILES OF THE 244 MILES OF THE WATERWAY.
    CHANNEL STABILIZATION  MEASURES WOULD INCLUDE I  36 STONE
    DIKES TOTALING 9,150 FEETl AND STONE BANK PAVING AT 9
    LOCATIONS TOTALING 4.7 MILFS.
    (MEMPHIS DISTRICT)
    COMMENTS MADE BYl EPA  DOI  USDA DOT  DOC  AHP
                      STATE AND LOCAL AGENCIES
    (EIS ORDER n S10042)


    JOYCE CREEK FLOOD CONTROL PROJECT                      01/02

    NOPTH CAROLINA
    COUNTY I        CAMDEN
    PROPOSED IS A FLOOD CONTROL AND DRAINAGE PROJECT FOR THE
    PREVIOUSLY CHANNELED JOYCE CREEK AND TWO OF ITS TRIBUTARIES,
    CYPRUS RUN AND MILL RUN, CAMDEN COUNTY, NORTH CAROLINA, CON*
    SISTING OF ABOUT 9.5 MILES OF STREAM CHANNEL EXCAVATION.
    CONSTRUCTION WILL BE FROM ONE SIDE ONLY INCLUDING CONSTRUC-
    TION OF SEDIMENT TRAPS.
    (WILMINGTON DISTRICT)

    COMMENTS MADE BYl EPA  HEW  DOC  DOI  USDA
                      STATE AND LOCAL AGENCIES
    (EIS ORDER * 610002)

-------
                              -32-
SUPPLEMENT                                                 DATE

    8NETTI3HAM HYDROELECTRIC PROJECT* CRATER LAKE DS-1     01/22

    ALASKA

    THIS STATEMENT SUPPLEMENTS A FINAL ESS* 0710632, FILED
    1-19-71 CONCERNING THE SNETTISHAM HYDROELECTRIC PROJECT
    LOCATED ON THE 8PEEL ARM OF PORT SNETTISHAM NEAR JUNEAU,
    ALASKA.  PROPOSED IS THE DEVELOPMENT OF THE CRATER LAKE
    PHASE REQUIRING REOPENING OF TWO BORROW PITS, CONSTRUCTION
    OF A POWER TUNNEL AND .PENSTOCK, DISPOSAL SITES FOR TUNNEL
    TAILINGS* A SURFACE ROAD TO THE TUNNEL, ACCESS TO THE TUNNEL
    NEAR CRATER LAKE, AND THE INSTALLATION OF A THIRD 27*000 KN
    GENERATOR IN THE EXISTING POWERHOUSE.  THE COOPERATING
    AGENCIES ARE DOE, FS, AND ALASKA POWER ADMINISTRATION.
    (ALASKA DISTRICT)
    (EIS ORDER * 810059)


    MANKATO-N. MANKATO-LE HRLIER FLOOD CONTROL DS-2       01/05

    MINNESOTA
    COUNTYl        BLUE EARTH
    PROPOSED IS THE ALTERATION OR RELOCATION OF TWO MN-169/60
    BRIDGES OVER THE BLUE EARTH RIVER IN BLUE EARTH COUNTY,
    MINNESOTA.  THE BRIDGES MUST BE RAISED OR REPLACED TO AN
    ELEVATION APPROXIMATELY 17 FEET ABOVE THE EXISTING BRIDGES.
    THE ALTERNATIVES DIFFER ONLY IN LOCATION AND WOULD CONSIST
    OF A NEW BRIDGE BUILT IMMEDIATELY UPSTREAM OF THE EXISTING
    BRIDGES AND NEW OFF AND ON RAMPS TO REPLACE AN EXISTING AT-
    GRADE INTERSECTION.  THIS STATEMENT SUPPLEMENTS AN AMENDED
    FINAL EIS FILED IN APRIL 1972.
    (ST. PAUL DISTRICT)
    (EIS ORDER 0 810003)

-------
                              -33-


              DEPARTMENT OF AGRICULTURE

CONTACTl      MR. BARRY FLAMM
              DIRECTOR
              OFFICE OF ENVIRONMENTAL QUALITY
              OFFICE OF THE SECRETARY
              U.S. DEPARTMENT OF AGRICULTURE
              ROOM 412-A  ADMIN. BUILDING
              WASHINGTON* D.C. 20250
              (202) 447*3965

              FOREST SERVICE

DRAFT                                                      DATE

    LITTLE ANNE SKI AREA DEVELOPMENT* ASPEN                01/21

    COLORADO
    COUNTYl        PITKIN
    PROPOSED IS THE ISSUANCE OF A SPECIAL USE PERMIT FOR THE
    DEVELOPMENT OF THE LITTLE ANNE SKI AREA WITHIN THE WHITE
    RIVER NATIONAL FOREST IN ASPEN, PITKIN COUNTY, COLORADO.
    THE PREFERRED ALTERNATIVE WOULD INVOLVE ISSUANCE OF A PERMIT
    FOR FULL DEVELOPMENT CONSISTING OFi  1) A SKIER CAPACITY
    OF 4,500, 2) ACCESSING THE MOUNTAIN WITH A SINGLE GONDOLA
    SYSTEM, AND 3) EXPANSION OF THE EXISTING PERMITTED AREAS
    OF ASPEN HIGHLANDS AND BURNT MOUNTAIN AT SNOWMASS.
    CUSDA-PS-DES-02-15-81-02)
    CEIS ORDER * 810048)


    TOWER MOUNTAIN AREA, HURON.MANISTEE NF                 01/14

    MICHIGAN
    COUNTYl        WEXFORD
    PROPOSED IS A LAND MANAGEMENT PLAN FOR THE TOWER MOUNTAIN
    AREA OF THE HURON.MANISTEE NATIONAL FOREST IN WEXFORD
    COUNTY, MICHIGAN.  THE PREFERRED ALTERNATIVE WOULD ALLOCATE
    THIS AREA FOR SKI USE AND INVOLVE MANAGEMENT REQUIREMENTS
    DEFERRING DEVELOPMENT UNTIL SUCH TIME IT IS DEEMED
    NECESSARY.  THE OTHER ALTERNATIVES CONSIDERED AREl  1)
    DISPERSED RECREATION, 2) NATURAL ENVIRONMENT* AND 3) TRADI-
    TIONAL FOREST MANAGEMENT.
    CEIS ORDER * 810030)
              SOIL CONSERVATION SERVICE

DRAFT                                                      DATE

    BELL CITY WATERSHED PROTECTION                         01/13

    LOUISIANA
    COUNTYl        CALCASIEU      CAMERON        JEFFERSON DAVIS
    PROPOSED IS A MULTIPURPOSE PROJECT FOR THE BELL CITY WATER-
    SHED IN THE PARISHES OF CALCASIEU, CAMERON AND JEFFERSON
    DAVIS, LOUISIANA.  THE PLANNED WORKS OF IMPROVEMENT INCLUDE

-------
                              -34-


    CONSERVATION LAND  TREATMENT ON 36,600 ACRES* 76 MILES OF
    CHANNELS AND APPURTENANT STRUCTURES, POUR MATER CONTROL
    STRUCTURES, SETBACK AND REBUILDING OF THE WEST LEVEE ON THE
    LACASSINF NATIONAL WILDLIFE REFUGE POOL, AND IMPROVEMENT
    OF BOAT AND PARKING FACILITIES.  CHANNEL WORK WILL INVOLVE
    THE CLEARING OF  36 MILES AND ENLARGEMENT OF 67 MILES OF
    EXISTING CHANNELS. THE COOPERATING AGENCY IS THE STATE OF
    LOUISIANA.
    (EIS ORDER * 610027)

DRAFT                                                      DATE
    MOSS NECK WATERSHED FLOOD PROTECTION                   01/28

    NORTH CAROLINA
    COUNTY!        ROBESON
    PROPOSED IS A FLOOD PROTECTION PLAN FOR THE MOSS CREEK
    WATERSHED IN ROBESON COUNTY, NORTH CAROLINA.  PLANNED
    MEASURES INCLUDE ACCELERATED LAND TREATMENT* 18.1 MILES OF
    CHANNEL EXCAVATION* AND 0.6 MILES OF CHANNEL RESTORATION.
    LAND TREATMENT MEASURES INCLUDE THE PLACEMENT OF TILE AND
    SURFACE DRAINS.  IN ADDITION TO NO ACTION FOUR OTHER ALTER-
    NATIVES ARE CONSIDERED.  THE COOPERATING AGENCIES ARE THE
    FOREST SERVICE AND THE STATE OF NORTH CAROLINA.
    (EIS ORDER * 810063)


    NEWTON-HOFFMAN WATERSHED* FLOOD PROTECTION             01/29

    NEW YORK
    COUNTYl        CHEMUNG        SCHUYLER
    PROPOSED IS A WATERSHED PROTECTION PROJECT FOR THE NEWTON.
    HOFFMAN CREEKS IN  CHEMUNG AND SCHUYLER COUNTIES* NEM YORK.
    THE PROTECTION MEASURES WOULD INVOLVEl  1) CONSTRUCTION OF
    THE LATTA BROOK  DEBRIS BASIN* 2) FLOODWAY DEVELOPMENT
    CONSISTING OF A  DIKE AND TWO DROP STRUCTURES* AND 3) CHANNEL
    IMPROVEMENTS ON  NEWTON* DIVEN AND HOFFMAN CREEKS.  THE
    ALTERNATIVES CONSIDER!  n CONSTRUCTION OF FOUR RETARDING
    STRUCTURES* 2) NO  ACTION* AND 33 NONSTRUCTURAL MEASURES.
    (EIS ORDER n 610086)

-------
                              -35-

              DEPARTMENT OF COMMERCE

CONTACTi      DR. ROBERT T. MIKI
              ACTING DEPUTY ASSISTANT SECRETARY
                FOR REGULATORY POLICY
              ROOM 7614
              DEPARTMENT OF COMMERCE
              WASHINGTON, D.C. 20330
              (202) 377-2482

              NAT'L OCEANIC AND ATMOSPHERIC ADMIN.

DRAFT                                                      DATE

    SPINY LOBSTER FMP REGULATORY ANALYSIS                  01/16

    ATLANTIC OCEAN GULF OF MEXICO REGULATORY
    PROPOSED IS THE REGULATORY ANALYSIS OF THE SPINY LOBSTER
    FISHERY MANAGEMENT  PLAN IN THE SOUTH ATLANTIC AND THE GULF OF
    MEXICO.  MANAGEMENT MEASURES CONSIDERED ARE:  1) SIZE
    LIMITS* 2) A CLOSED SEASON, 3) CERTAIN GEAR RESTRICTIONS,
    4)  MEASURES TO PROTECT "SHORTS"  AND "BERRIED" FEMALES AND
    PREVENT POACHING. AND 5) A MEASURE TO ENCOURAGE A MECHANISM
    TO  MINIMIZE CONFLICTS.
    (EIS ORDER * 810039)


    GROUNDFISH FISHERY FMp REGULATORY ANALYSIS             01/16

    GULF OF MEXICO REGULATORY
    PROPOSED IS THE REGULATORY ANALYSIS OF THE GROUNDFISH
    FISHERY MANAGEMENT PLAN FOR THE  GULF OF MEXICO.  IMPLEMEN.
    TATION WOULD PROVIDE GEAR RESTRICTIONS IN THE SHRIMP FISHERY
    TO  REDUCE BYCATCH OF GROUNDFISH  WHEN SUCH GEAR  IS PROVEN TO
    BE  EFFECTIVE AND MEETS SPECIFIED CRITERIA.  NURSERY SANCTU-
    ARIES  IN STATE WATERS  AND HABITAT PROTECTION WOULD BE
    ENCOURAGED.
    (EIS ORDER * 810040)


    INCIDENTAL TAKE OF CALL PORPOISE                      01/16

    PACIFIC OCEAN
    PROPOSED IS  THE ALLOWANCE OF  THE INCIDENTAL TAKE OF DALL
    PORPOISES WITHIN THE JAPANESE SALMON FISHERY  IN THE NORTH
    PACIFIC AND  BERING SEA.   THE  ALTERNATIVES EXAMINED AREl   1)
    ALLOW  THE INCIDENTAL TAKE OF  MARINE MAMMALS!  AND 2) NOT
    ALLOW  TAKE*  THEREBY  ENDING  THE  JAPANESE SALMON  FISHERY BY
    TAKING NO ACTION BY  JUNE* 1981.  IF THE TAKE  OF MARINE
    MAMMALS IS ALLOWED THE OPTIONS  CONSIDERED  AREl  1) GRANTING
    OF  AN  INCIDENTAL TAKE  PERMIT* OR 2) RECOMMENDATION OF
    LEGISLATIVE  ACTION TO  EXTEND  THE EXISTING  PERMIT  EXEMPTION.
     CEIS ORDER «  610033)

-------
                              -36-
DRAFT SUPPLEMENT                                             DATE

    HIGH SEAS SALMON FISHERY FMP (DS-2)                         01/30

    ALASKA         PACIFIC OCEAN
    THIS STATEMENT SUPPLEMENTS A  FINAL EIS, #790076, FILED
    1-19*79 CONCERNING THE FISHERY MANAGEMENT PLAN FOR THE HIGH
    SEAS SALMON FISHERY  IN THE PACIFIC OCEAN OFF THE COAST OF
    ALASKA.  PROPOSED IS  AN AMENDMENT TO THE FMP WHICH WOULD
    INVOLVE THE FOLLOWING!  1) REDUCTION OF THE ACCEPTABLE BIO*
    LOGICAL CATCH AND OPTIMUM YIELD RANGE BY 15% AND USE THE
    UPPER LIMIT OF THE OY RANGE AS A HARVEST CEILING* 2)
    REDUCTION OF THE CHINOOK FISHING SEASON, AND 3) LIMITATION
    OF HAND TROLL VESSELS TO TWO  LINES AND GURDIES OR FOUR SPORT
    LINES.
    (EIS ORDER * 810091)


    SALMON COMMERCIAL/RECREATIONAL FMP, AMENDMENT OS-3     01/23

    PACIFIC OCEAN
    THIS STATEMENT SUPPLEMENTS FINAL EIS, #760221, FILED
    3-6-78.  PROPOSED IS  THE AMENDMENT OF THE FISHERY MANAGEMENT
    PLAN FOR THE PACIFIC  COMMERCIAL AND RECREATIONAL SALMON
    FISHERIES OFF THE COASTS OF WASHINGTON, OREGON AND
    CALIFORNIA.  THE 1981 AMENDMENT EVALUATES THE CURRENT STATUS
    OF THE COASTWIDE SALMON STOCKS, REVIEWS THE 1980 SALMON
    FISHERY, AND PRESENTS THE MANAGEMENT REGIME ALTERNATIVES FOR
    THE 1981 FISHERIES.   SEVERAL  MANAGEMENT OPTIONS AND ALTER-
    NATIVES ARE CONSIDERED.
    (EIS ORDER * 810069)

-------
                              -37-

              DEPARTMENT OF DEFENSE, ARMY

CONTACT!      COL. KENNETH HALLERAN
              CHIEF OF THE ENVIRONMENTAL OFFICE
              HEADQUARTERS DAEN-ZCE
              OFFICE OF THE ASSISTANT CHIEF OF ENGINEERS
              DEPARTMENT OF THE ARMY
              ROOM 1E676, PENTAGON
              WASHINGTON, D.C. 20310
              (202) 69a-
-------
                          -38-

MISSION AND ACTIVITIES AT CURRENT LEVELS, 2) DOWNGRADING
FORT DEVENS' ACTIVITIES BY RELOCATING EXISTING ACTIVITIES
AND TROOP UNITS TO OTHER INSTALLATIONS AND BY MAINTAINING
THE INSTALLATION IN A 8EMI.ACTIVE STATUS, 3) TOTAL CLOSURE
OF THE INSTALLATION AND TRANSFER OF ALL FUNCTIONS TO OTHER
FEDERAL FACILITIES* AND 4) EXPAND THE MISSION TO INCLUDE
RESTATIONXNG OF TROOPS AND ACTIVITIES FROM OTHER LOCATIONS.
COMMENTS MADE BYl EPA  HEW  DOI  U8AF
                  LOCAL AGENCIES
                  BUSINESSES
(EIS ORDER * 810073)

-------
                                    -39-

                    DEPARTMENT  OF  ENERGY

     CONTACTl       DR.  ROBERT  STERN
                    ACTING DIRECTOR
                    NEPA AFFAIRS DIVISION
                    DEPARTMENT  OF  ENERGY
                    MAIL STATION 46-064, FORRESTAL BLDG.
                    WASHINGTON, DC 20585
                    (202) 252-4600


     DRAFT                                                      DATE

         SOLVENT REFINED COAL-1 DEMONSTRATION PROJECT           01/09

         KENTUCKY
         COUNTYl        DAVIESS
         PROPOSED  IS A  COST SHARING AGREEMENT FOR THE CONSTRUCTION
         AND OPERATION  OF A 6000  TPSD SOLVENT REFINED COAL DEMON.
         8TRATION  PROJECT WITH POTENTIAL FOR ULTIMATE DEVELOPMENT OF
         A 30,000  TPDS  COMMERCIAL FACILITY AT NEWMAN IN DAVIESS
         COUNTY, KENTUCKY.  THE ALTERNATIVES CONSIDERl  1) SITE
         LOCATIONS, 2)  DESIGN  OPTIONS, 3) PLANT LAYOUT, AND 4)
         TERMINATION OF CONTRACT.
         (DOE/EIS-0073-D/VI)
         (EIS ORDER * 610017)


     FINAL                                                      DATE

         SCR-II DEMONSTRATION  PROJECT, FORT MARTIN              01/22

         WEST VIRGINIA
         COUNTYl        MONONGALIA
         PROPOSED  IS THE SOLVENT REFINED COAL-II DEMONSTRATION
         PROJECT.  THIS PROJECT WOULD INVOLVE THE CONSTRUCTION AND
         OPERATION OF A 6,000  TONS OF COAL PER STREAM DAY (TPSD)
         CAPACITY FACILITY AT  FORT MARTIN IN MONONGALIA COUNTY, WEST
         VIRGINIA.  THE FACILITY WOULD CONVERT HIGH-SULFUR COAL INTO
         A LOW-SULFUR,  LOW.ASH PRIMARY LIQUID FUEL PRODUCT? SECONDARY
         GASEOUS AND LIQUID FUEL PRODUCTS? AND BY-PRODUCT SULFUR,
         AMMONIA AND TARS ACIDS.  A GOAL OF THE DEMONSTRATION PROGRAM
         IS TO FACILITATE THE  CONSTRUCTION AND OPERATION OF A 30,000
         TPSD COMMERCIAL FACILITY.
         (DOE/EIS-0069-F)
         COMMENTS MADE  BYl DOT  DOI  HUD  HHS  EPA  DOC  COE  U8AF
                           STATE AND LOCAL AGENCIES
                           GROUPS, INDIVIDUALS AND BUSINESSES
         (EIS ORDER * 810062)


DRAFT SUPPLEMENT                                                 DATE

         MULTIFAMILY AND COMMERCIAL BUILDINGS, RCSP, CDS-1)     01/30

         PROGRAMMATIC
         THIS STATEMENT SUPPLEMENTS FINAL EIS, «791153, FILED
         11-13-79 CONCERNING THE RESIDENTIAL CONSERVATION SERVICE

-------
                              -40-

    PROGRAM.  PROPOSED IS THE EXPANSION OP THAT PROGRAM TO
    ENCOMPASS MULTIFAMILY AND COMMERCIAL BUILDINGS AND THE
    IMPLEMENTATION OP THE COMMERCIAL AND APARTMENT CONSERVATION
    SERVICE PROGRAM.  THIS PROGRAM WOULD EXTEND ENERGY AUDITING
    SERVICES TO RESIDENTIAL BUILDINGS WITH FIVE UNITS OR MORE
    AND SMALL COMMERCIAL BUILDINGS USING 4,000 KW HOURS OR LESS
    OF ELECTRICITY OR 1,000 THERMS OR LESS OF NATURAL GAS OR
    EQUIVALENT FUEL ON AN AVERAGE MONTHLY BASIS.
    (DOE/EI8-0050-DS)
    (EIS ORDER 0 810094)
              BONNEVILLE POWER ADMINISTRATION

FINAL                                                      DATE

    BPA ROLE IN PACIFIC NW POWER SUPPLY SYSTEM             01/23

    PROGRAMMATIC
    THIS PROGRAMMATIC STATEMENT EXAMINES THE ROLE OF THE BPA
    IN THE PACIFIC NW POWER SUPPLY SYSTEM, INCLUDING ITS PARTI-
    CIPATION IN A HYDRO-THERMAL POWER PROGRAM.  THE ALTERNATIVES
    CONSIDERl  1) LEGISLATION REDUCING BPA'S ROLE IN THE REGION,
    2) USE EXISTING AUTHORITY, 3) INCREASED BPA ROLE IN REGION,
    AND fl) ESTABLISHMENT OF A REGIONAL ENERGY COMMISSION.  THE
    ORIGINAL DRAFT, 0770896, FILED 7-22-77 WAS REPLACED BY A
    REVISED DRAFT, 0800260, FILED 4-10-80.
    (DES/EIS-0066)
    COMMENTS MADE BYl AHP  HHS  DOI  USDA DOC  COE  EPA  NRC  TVA
                      STATE AND LOCAL AGENCIES
    (EIS ORDER « 810065)

-------
                              -41-

              DEPARTMENT OF HUD

CONTACTl      MR. RICHARD H. BROUN, DIRECTOR
              OFFICE OF ENVIRONMENTAL DUALITY
              ROOM 7274
              DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
              451 7TH STREET, S.W.
              WASHINGTON, D.C. 20410
              (202) 755-6300

DRAFT                                                      DATE

    SAN ANTONIO AREAWIDE STUDY                             01/27

    TEXAS
    COUNTYl        BEXAR
    PROPOSED IS AN AREAWIDE STUDY FOR THE SAN ANTONIO NORTH*
    NORTHWEST GROWTH CORRIDOR IN SAN ANTONIO, BEXAR COUNTY,
    TEXAS.  THIS STUDY WILL ALLOW HUD TO ACCEPT FUTURE HOUSING
    PROJECT APPLICATIONS WITHOUT APPLYING THE AUTOMATIC EIS
    THRESHOLD THEREBY REDUCING THE HUD PROCESSING TIME OF
    PROJECT APPLICATIONS.  THE STUDY ENCOMPASSES AN AREA OF 367
    SQUARE MILES.  THE COOPERATING AGENCIES ARE THE EPA, COE,
    VA AND THE STATE OF TEXAS.
    (HUD-R06-EIS-81-1D)
    (EIS ORDER * 810080)


    WINDMILL MEADOWS/LYNN CREEK ESTATES SUBDIVISION        01/06

    TEXAS
    COUNTYl        TARRENT
    PROPOSED IS THE ISSUANCE OF HUD HOME MORTGAGE INSURANCE FOR
    THE LYNN CREEK ESTATES AND WINDMILL MEADOWS SUBDIVISION IN
    ARLINGTON, TARRENT COUNTY, TEXAS.  THE COMMUNITY ENCOMPASSES
    1,326 ACRES WHICH WILL CONSIST OF 3,788 SINGLE FAMILY
    UNITS, 816 MEDIUM DENSITY UNITS, AND 445 HIGH DENSITY APART-
    MENT UNITS.  WITHIN THE DEVELOPMENT 111.6 ACRES WOULD BE
    PRESERVED AS OPEN SPACE AND 104.2 ACRES DEVOTED TO COMMER.
    CIAL AND RETAIL PURPOSES.
    (HUD-R06-EIS-80-11D)
    CEIS ORDER * 810095)


    RIPPON LANDING DEVELOPMENT, MORTGAGE INSURANCE         01/22

    VIRGINIA
    COUNTYl        PRINCE WILLIAM
    PROPOSED IS THE ISSUANCE OF HUD HOME MORTGAGE INSURANCE FOR
    THE PIPPON LANDING PLANNED DEVELOPMENT IN PRINCE WILLIAM
    COUNTY, VIRGINIA.  THE DEVELOPMENT WOULD ENCOMPASS 517 ACRES
    AND CONSIST OF A MIX OF APPROXIMATELY 1,885 TOWNHOUSE, CON-
    DOMINIUM AND APARTMENT UNITS.  APPROXIMATELY 145 ACRES WOULD
    BE RESERVED FOR COMMUNITY SUPPORT FACILITIES.  ALSO TO BE
    INCLUDED IS A SHOPPING CENTER AND RECREATIONAL FACILITIES.
    (EIS ORDER * 810058)

-------
                              -42-
DRAFT                                                      DATE

    THE MEADOWS DEVELOPMENT, MORTGAGE INSURANCE            01/26

    WASHINGTON
    COUNTYl        THUR3TON
    PROPOSED IS THE ISSUANCE OF HUD HOME MORTGAGE INSURANCE FOR
    THE MEADOWS RESIDENTIAL DEVELOPMENT IN THURSTON COUNTY*
    WASHINGTON.  THE DEVELOPMENT WOULD ENCOMPASS 247 ACRES AND
    CONSIST OFI  i) 474 SINGLE FAMILY UNITS, 2) 156 DUPLEX
    UNITS, 3j 124 MULTI-FAMILY UNITS, 4) AN 11 ACRE SCHOOL SITE*
    AND 5) A 5.2 ACRE CONVENIENCE CENTER.
    (HUD-R10-EIS-80-2D)
    (EIS ORDER * 8100753


FINAL                                                      DATE

    GREENWOOD LAKES PLANNED UNIT DEVELOPMENT               01/14

    FLORIDA
    COUNTY!        8EMINOLE
    PROPOSED IS THE ISSUANCE OF HUD HOME MORTGAGE INSURANCE FOR
    THE GREENWOOD LAKES PLANNED UNIT DEVELOPMENT IN SEMINOLE
    COUNTY, FLORIDA.  THE DEVELOPMENT ENCOMPASSES i,469 ACRES
    AND WILL CONTAIN 5,110 TOWNHOUSES, SINGLE-FAMILY AND MULTI-
    FAMILY HOMES.  THE DEVELOPMENT WILL ALSO INCLUDE SCHOOL,
    OPEN SPACE, PARK AND LAKE AREAS.
    CHUD-R04-EIS-78-03)
    COMMENTS MADE BYl USDA USAF COE  DOC  HHS  DOI  EPA  TVA  DOT
                      STATE AND LOCAL AGENCIES
                      BUSINESSES
    CEIS ORDER * 810031)


    WESTGATE HEIGHTS SUBDIVISION, ALBUQUERQUE              01/28

    NEW MEXICO
    COUNTYl        BERNALILLO
    PROPOSED IS THE ISSUANCE OF HUD HOME MORTGAGE INSURANCE FOR
    THE WESTGATE HEIGHTS SUBDIVISION, ALBUQUERQUE, BERNALILLO
    COUNTY, NEW MEXICO.  WHEN COMPLETED, THE SUBDIVISION, WHICH
    ENCOMPASSES APPROXIMATELY 904 ACRES, IS EXPECTED TO CONSIST
    OF SINGLE FAMILY, MULTI-FAMILY, AND APARTMENT HOUSING UNITS,
    AS WELL AS SCHOOL, CHURCH, COMMERCIAL, PARK AND RECREATION
    FACILITIES.
    (HUD-R06-EIS-80-13F)

    COMMENTS MADE BYl COE  EPA  VA   AHP  DOI  DOE  DOT  USAF
                      STATE AND LOCAL AGENCIES
    CEIS ORDER * 810085)


    FAIRFIELD SUBDIVISION MORTGAGE INSURANCE               01/28

    TEXAS
    COUNTYl        TARRANT
    PROPOSED IS THE ISSUANCE OF HUD HOME MORTGAGE INSURANCE FOR
    THE FAIRFIELD ADDITION SUBDIVISION  IN ARLINGTON, TARRANT
    COUNTY, TEXAS.  WHEN COMPLETED THE  SUBDIVISION WILL CONSIST

-------
                              -43-

     OF  1,363  SINGLE  FAMILY  HOMES  ON  350  ACRES  OF  THE  510  ACRE
     SITE.  THE DEVELOPMENT  MILL ALSO INCLUDE A TEN  ACRE SCHOOL
     SITE AND  A 12  ACRE  PARK SITE.
     (HUD-R06-EIS-81-1F)
     COMMENTS  MADE  BYl EPA   VA
                      STATE AGENCIES
     (EIS ORDER * 610093)

FINAL                                                      DATE
     GEM HEIGHTS DEVELOPMENT MORTGAGE INSURANCE             01/15

     WASHINGTON
     COUNTYl        PIERCE
     PROPOSED  IS THE  ISSUANCE OF HUD  HOME  MORTGAGE INSURANCE  FQR
     THE GEM HEIGHTS  PLANNED DEVELOPMENT  IN  PIERCE COUNTY,
     WASHINGTON.  THE MULTI-PHASED PLANNED RESIDENTIAL DEVELOP-
     MENT IS 374.55 ACRES IN SIZE  AND IS  INTENDED  TO CONTAIN  A
     MAXIMUM OF 1,727 DWELLING UNITS  OF A  VARIETY  OF HOUSING
     TYPES.  IN ADDITION, ACCESSORY NEIGHBORHOOD COMMERCIAL  AND
     SCHOOL AREAS WILL BE PROVIDED.
     (HUD-R10-EI8-1F)
     COMMENTS  MADE  BYl USDA  COE  EPA   DOT  DOI   HUD
                      STATE AND LOCAL AGENCIES
                      BUSINESSES
     (EIS ORDER * 810032)
              SECTION 104(H)

DRAFT                                                      DATE

    GENERAL MOTORS ASSEMBLY PLANT RELOCATION, UDAG         01/30

    KANSAS
    COUNTYl        WYANDOTTE
    PROPOSED IS THE AWARDING OF A UDAG TO FUND PUBLIC IMPROVE.
    MENTS FOR THE PROPOSED SITE OF THE NEW GENERAL MOTORS
    ASSEMBLY PLANT IN KANSAS CITY, WYANDOTTE COUNTY, KANSAS.
    PUBLIC IMPROVEMENTS WOULD CONSIST OF THE WIDENING AND IMPROVE-
    MENT OF STREETS, CONSTRUCTION OF NEW STORM AND SANITARY
    SEWER LINES, AND CONSTRUCTION OF A FIRE STATION.  THE ALTER-
    NATIVES CONSIDERl  1) NO ACTION, 2) POSTPONEMENT, 3) RENOVA-
    TION/EXPANSION OF THE EXISTING FACILITY, 4) ACQUISITION AND
    RENOVATION OF THE EXISTING INDUSTRIAL FACILITY, AND 5)
    RELOCATION OUTSIDE THE CITY.
    (EIS ORDER 0 810090)


FINAL                                                      DATE

    PUEBLO DOWNTOWN HOTEL/CONVENTION CENTER, UDAG          01/07

    COLORADO
    COUNTYl        PUEBLO
    PROPOSED IS THE AWARDING OF A UDAG FOR THE PUEBLO DOWNTOWN
    HOTEL/CONVENTION CENTER PROJECT IN THE CITY AND COUNTY OF
    PUEBLO, COLORADO.  THE COMPLEX WILL BE COMPOSED OF SEPARATE

-------
                          -44-

BUT INTEGRATED FACILITIES INCLUDINGl  1) A CONFERENCE CENTER
2) A HOTEL* 3) A RETAIL COMPLEX, 4) A PARKING FACILITY* AND
5) ASSOCIATED ON-SITE IMPROVEMENTS.
COMMENTS MADE BYl AHP  EPA  FEMA
                  STATE AND LOCAL AGENCIES
(EIS ORDER * 810010)

-------
                              -45-

              DEPARTMENT OF INTERIOR

CONTACTS      MR. BRUCE. BLANCHARD
              .DIRECTOR, ENVIRONMENTAL PROJECT REVIEH
              ROOM 4256 INTERIOR B|_DG.
              DEPARTMENT OF THE INTERIOR
              WASHINGTON, D.C.  20240
              (202) 343-3891


FINAL                                                      DATE

    ROJO CABALLOS MINE RECLAMATION PLAN                    01/27

    WYOMING
    COUNTYl        CAMPBELL
    PROPOSED IS THE APPROVAL OF A MINING AND RECLAMATION PLAN
    FOR THE ROJO CABALLOS MINE IN CAMPBELL COUNTY, WYOMING.
    THE MINE PLAN AREA ENCOMPASSES 5,815 ACRES.  APPROXIMATELY
    317.5 MILLION SHORT TONS OF LOW.SULFUR SUBBITUMINOUS COAL
    WOULD BE EXTRACTED DURING A 24 YEAR PERIOD.'  THE ALTER-
    NATIVES INCLUDEl  1) NO ACTION, 2) APPROVE PLAN BUT BEGIN
    MINING AT A LATER DATE, 3) DISAPPROVAL OF PLANS, AND 4)
    APPROVE PLAN WITH INCLUDED STIPULATIONS.  THE COOPERATING
    AGENCY IS THE USGS.
    (OSM-EIS-3) (FES-81-7)
    COMMENTS MADE BYl DOI  HHS  HUD  EPA  AHP
                      STATE AND LOCAL AGENCIES
                      GROUPS, INDIVIDUALS AND BUSINESSES
    (EIS ORDER * 810074)
              BUREAU OF INDIAN AFFAIRS

DRAFT                                                      DATE

    MT. TOLMAN OPEN PIT COPPER-MOLYBDENUM MINE, LEASE      01/23

    WASHINGTON
    COUNTYl        FERRY
    PROPOSED IS THE APPROVAL OF A MINERAL LEASE AND MINING PLAN
    FOR AN OPEN PIT COPPER-MOLYBDENUM MINE ON THE COLVILLE
    INDIAN RESERVATION IN FERRY COUNTY, WASHINGTON.  THE PROJECT
    WOULD CONSIST OFl  1) A FLOTATION MILL PLANT DESIGNED FOR
    THE PRODUCTION OF COPPER AND MOLYBDENUM CONCENTRATES} 2)
    WASTE DISPOSAL SITESf AND 3) SUPPORT FACILITIES, INCLUDING
    A TRANSMISSION LINE AND A WATER PIPELINE.  OPERATIONS WOULD
    MINE AND MILL 60,000 TONS PER DAY OF ORE FOR AN ESTIMATED
    43 YEARS.  THE COOPERATING AGENCIES ARE BPA, EPA, THE
    COLVILLE CONFEDERATED TRIBES AND THE HHS/INDIAN HEALTH
    SERVICE.
    (DES-B1-4)
    (EIS ORDER * 810071)

-------
FINAL                          ~46~                         DATE

    UTE MOUNTAIN STRIP COAL MINE  LEASE                     01/23

    NEW MEXICO
    COUNTYl        SAN JUAN
    PROPOSED IS THE LEASING OF THE UTE MOUNTAIN UTE TRIBAL LANDS
    IN SAN JUAN COUNTY* NEW MEXICO FOR THE PURPOSES OF COAL
    MINING.  THE AREA ENCOMPASSES 1,320 ACRES AND WOULD INVOLVE
    A 10 YEAR LEASE WITH AN OPTION TO RENEW FOR 10 YEARS.
    EXPLORATION HAS INDICATED  THAT APPROXIMATELY 8 TO 10 MILLION
    TONS OF COAL COULD BE MINED.  THE ALTERNATIVES CONSIDER!
    1) NON-DEVELOPMENT* AND 2) ALTERNATIVE MINING METHODS.  THE
    EXACT TYPE OF MINE OPERATIONS HAVE NOT BEEN DETERMINED.
    (FES-81-4)
    COMMENTS MADE BYl DOI  EPA
                      LOCAL AGENCIES
    (EIS ORDER * 810068)


    WILDHORSE RESERVOIR AND LANDS* RECREATIONAL LEASE      01/06

    NEVADA
    COUNTYl        ELKO
    PROPOSED IS THE LEASING OF 150 ACRES OF FEDERAL LANDS* KNOWN
    AS THE WILDHORSE MARINA* WITHIN THE WILDHORSE RESERVOIR*
    ELKO COUNTY* NEVADA.  THE  ALTERNATIVES CONSIDER!  1) NO
    ACTION* 2) RETAIN PRESENT  ADMINISTRATION IN ADDITION TO
    FURTHER RECREATIONAL DEVELOPMENT* 3) LEASE OR CONVEY ALL OR
    PORTIONS OF THE RESERVOIR  AREA TO NONTRIBAL ENTITIES* AND
    4) SEEK DOI SPONSORSHIP OR LEGISLATION FOR THE CONVEYANCE
    IN TRUST OF THE BIA-ADMINISTERED AREAS OF WILDHORSE RESER-
    VOIR TO THE TRIBES (PROPOSED  ACTION OF DRAFT EIS).
    (FES-80-55)


    COMMENTS MADE BYl DOI  DOC  USDA EPA  COE  AHP
                      STATE AND LOCAL AGENCIES
                      GROUPS*  INDIVIDUALS AND BUSINESSES
    (EIS ORDER * 810009)
              BUREAU OF LAND MANAGEMENT

DRAFT                                                      DATE

    MOON LAKE POWER UNITS 1 AND 2* RIGHT-OF-WAY            01/08

    UTAH
    COUNTYl        UINTAH
    PROPOSED IS THE AWARDING OF RIGHT-OF-WAY FOR THE MOON LAKE
    POWER PLANT UNITS i AND 2 IN UINTAH COUNTY* UTAH.  THE
    ELECTRICITY GENERATED WOULD BE DISTRIBUTED BY ONE 345 KV
    TRANSMISSION LINE AND FOUR 138 KV LINES.  THE ALTERNATIVES
    CONSIDER VARIOUS OPTIONS FOR PLANT SITES* COAL SUPPLY* COAL
    TRANSPORT* WATER SOURCE* AND POWER TRANSMISSION SYSTEMS.
    THE U8DA/REA IS A COOPERATING AGENCY AND MAY ISSUE LOAN
    GUARANTEES.  THE F8 IS ALSO A COOPERATING AGENCY.
    (USDA-REA-(ADM)-81-1-0)
    (EIS ORDER # 810016)

-------
                              -47-
FZNAL                                                      DATE

    SOUTHERN APPALACHIAN REGIONAL COAL LEASING             01/16

    ALABAMA
    COUNTY!        SEVERAL
    PROPOSED IS THE INITIATION OF AN ACTIVE COAL LEASING
    PROGRAM IN THE COUNTIES OF FAYETTE, JEFFERSON, TUSCALOOSA
    AND WALKER, ALABAMA.  THE LOW OR PREFERRED ALTERNATIVE WOULD
    OFFER FOR LEASE IN MID-1981, SIX UNDERGROUND TRACTS AND
    SEVEN SURFACE-MINEABLE TRACTS* WHICH MOULD RESULT IN AN
    AVERAGE ANNUAL PRODUCTION OF APPROXIMATELY 6 MILLION TONS.
    THE ALTERNATIVES CONSIDER!  1) NO ACTION, 2) UNDERGROUND
    MINING, 3) LOW PRODUCTION, a) MEDIUM PRODUCTION, AND s> HIGH
    PRODUCTION.
    (FES-81-3)
    COMMENTS MADE BY: AHP  HUD  FERC U8DA DOI  TVA  HHS  EPA  DOT
                      STATE AND LOCAL AGENCIES
                      GROUPS AND BUSINESSES
    (EIS ORDER * 610035)


    1961 OCS OIL/GAS LEASE SALE * 56, SOUTH ATLANTIC       01/22

    ATLANTIC OCEAN
    PROPOSED IS THE 1981 OUTER CONTINENTAL SHELF (OCS) OIL AND
    GAS LEASE SALE NO. 56 FOR THE SOUTH ATLANTIC OFFSHORE REGION
    WHICH CONSISTS OF 1,628,251 ACRES OFFSHORE THE STATES OF
    NORTH CAROLINA, SOUTH CAROLINA, GEORGIA AND FLORIDA.  IT IS
    ESTIMATED THAT THERE ARE l.<* BILLION BARRELS OF OIL AND 2.5
    TRILLION CUBIC FEET OF NATURAL GAS IN THE LEASING AREA.
    TOTAL DEVELOPMENT OF THE PROJECT WILL REQUIRE 101 EXPLORA.
    TORY WELLS, 56 PRODUCTION PLATFORMS, AND 1,299 DEVELOPMENT
    NELLS.  FOUR ALTERNATIVES ARE!  1) HOLD SALE AS PROPOSED,
    2) TRACT DELETION, 3) DELAY SALE, AND 4) WITHDRAW THE SALE
    (NO ACTION).
    (FES-81-6)
    COMMENTS HADE BYl DOI  U8AF DOT  EPA  FERC COE  DOC
                      STATE AND LOCAL AGENCIES
                      GROUPS, INDIVIDUALS AND BUSINESSES
    (EIS ORDER # 610063)


    MOUNT DOME PLANNING UNIT LIVESTOCK GRAZING MGMT.       01/06

    CALIFORNIA
    COUNTY!        SISKIYOU       MODOC
    PROPOSED IS THE IMPLEMENTATION OF A LIVESTOCK GRAZING
    MANAGEMENT PLAN FOR THE MOUNT DOME AREA IN SISKIYOU AND
    MODOC COUNTIES, CALIFORNIA.  COMPONENTS INCLUDE!  1)
    ADJUSTMENTS OF AUTHORIZED LIVESTOCK USE; 2) INTRODUCTION OF
    GRAZING TREATMENTSl AND 3) RANGE PROJECTS AND FACILITIES
    INCLUDING VEGETATION MANIPULATION AND CONSTRUCTION OF RESER-
    VOIRS, FENCING, PIPELINE, WATER TANK AND THROUGHS.
    THE ALTERNATIVES INCLUDE MODERATE, PRIMITIVE, LIMITED OR

-------
                               -48-

    EXCLUSIVE USES AND NO ACTION.
    (FES-81-2)
    COMMENTS MADE BYl FERC DOT  EPA  USDA HH8  AHP
                      STATE AGENCIES
                      GROUPS AND INDIVIDUALS
    CEIS ORDER * 810005}

FINAL                                                       DATE
    E. SAN DIEGO CO. PLANNING UNIT, GRAZING MANAGEMENT     01/06

    CALIFORNIA
    COUNTY!        SAN DIEGO
    PROPOSED IS A GRAZING AND WILDERNESS MANAGEMENT PLAN FOR
    THE EASTERN SAN DIEGO COUNTY PLANNING UNIT (MCCAIN VALLEY)
    IN THE EL CENTO RESOURCE AREA OF THE RIVERSIDE DISTRICT,
    CALIFORNIA.  THE PLANNING AREA ENCOMPASSES 98,902 ACRES OF
    PUBLIC LAND.  GRAZING MANAGEMENT WOULD BE IMPLEMENTED ON
    67*903 ACRES, AND WILDERNESS DESIGNATION RECOMMENDED FOR
    41,776 ACRES.  THE GRAZING ALTERNATIVES INCLUDES  1) NO
    GRAZING, 2) INTENSIVE USE, 3) LIMITED USE, AND «) NO ACTION.
    THE WILDERNESS ALTERNATIVES ARE!  1) MAXIMIZE WILDERNESS* 2)
    N.O WILDERNESS* AND 3) LIMITED WILDERNESS.
    COMMENTS MADE BYl DOI  EPA  USDA
                      STATE AND LOCAL AGENCIES
                      GROUPS* INDIVIDUALS AND BUSINESSES
    (EIS ORDER * 610006)
              NATIONAL PARK SERVICE

DRAFT                                                      DATE

    DOMINQUEZ-ESCALANTE NATIONAL HISTORIC TRAIL            01/28

    SEVERAL
    COUNTY!        SEVERAL
    PROPOSED IS THE DESIGNATION OF THE DOMINQUEZ-ESCALANTE TRAIL
    LOCATED IN NEW MEXICO* COLORADO, UTAH AND ARIZONA* AS A
    COMPONENT OF THE NATIONAL TRAILS SYSTEM* WITHIN THE CATEGORY
    OF NATIONAL HISTORIC TRAILS.  THE TRAIL EXTENDS FOR 1*794
    MILES.  ALSO RECOMMENDED IS THE MARKING AND INTERPRETATION
    OF THE ROUTE ALONG THE HIGHWAY AND THE DEVELOPMENT OF TRAIL
    SEGMENTS FOR PUBLIC USE.  THE ALTERNATIVES CONSIDER!  1)
    NO ACTION, 2) DESIGNATION OF THE ENTIRE TRAIL EXCLUDING
    MARKING OR DEVELOPMENT* AND 3) DESIGNATION OF THE ENTIRE
    TRAIL WITH MARKINGS EXCLUDING DEVELOPMENT.
    (DE8-81-3)
    (EIS ORDER 0 S10082)


FINAL                                                      DATE

    LASSEN VOLCANIC NATIONAL PARK                          01/23

    CALIFORNIA
    COUNTY!        SEVERAL
    PROPOSED IS A GENERAL MANAGEMENT PLAN FOR LASSEN VOLCANIC

-------
                              -49-

    NATZONAL PARK LOCATED IN THE COUNTIES OF SHASTA, TEHAMA,
    LASSEN AND PLUMAS,  CALIFORNIA.   MAJOR FEATURES OF THE PLAN
    AREl   1) REMOVAL OF DEVELOPMENTS ON THE MANZANITA LAKE AREA,
    2) CONSTRUCTION OF  INTERPRETIVE CENTERS AT THE TWO MAIN
    ENTRANCES TO THE PARK,  3) RETENTION OF THE PRESENT CAPACITY
    OF THE SKI AREA WITH IMPROVED FACILITIES, AND 4) REPLACEMENT
    OF INADEQUATE SEWAGE TREATMENT  FACILITIES IN THE PARK.
    CFE8-81-5)
    COMMENTS MADE BYl AHP  USDA DOI  DOT  EPA
                      STATE AND LOCAL AGENCIES
                      GROUPS, INDIVIDUAL AND BUSINESSES
    (EIS ORDER « 810067)
              MATER AND POWER RESOURCES SERVICES

DRAFT                                                      DATE

    ACREAGE LIMITATION, RECLAMATION ACT OF 190?            01/00

    REGULATORY
    PROPOSED ARE THREE ALTERNATIVES FOR REGULATORY PROCEDURES
    UNDER THE RECLAMATION ACT OF 1902* SPECIFICALLY REGARDING
    ACREAGE LIMITATION PROVISIONS.  THE ACT ALLOWS FEDERAL
    ASSISTANCE THROUGH IRRIGATION DEVELOPMENT SO THAT OPPORTUN*
    ITIES CAN BE PROVIDED IN ARID PARTS OF THE WESTERN US.
    ACREAGE LIMITATIONS PROVIDED THAT FEDERALLY DEVELOPED WATER
    COULD NOT BE SOLD FOR USE ON MORE THAN 160 ACRES IN INDI-
    VIDUAL OWNERSHIP AND THAT THE USER HAD TO LIVE ON OR NEAR
    THE BENEFITED LAND.
    CDES-81-1)
    (EIS ORDER * 810015)

-------
                              -50-

              DEPARTMENT OF LABOR

CONTACTl      MS. JOANNE LINDHART, CHIEF
              OFFICE OF ENVIRONMENTAL IMPACT ASSESSMENT
              DEPARTMENT OF LABOR
              ROOM N-3673
              WASHINGTON, D.C.  20210
              (202)523-7111

FINAL                                                      DATE

    OCCUPATIONAL NOISE EXPOSURE STANDARDS, AMENDMENT       01/06

    REGULATORY
    PROPOSED IS AMENDMENT OF THE STANDARD FOR OCCUPATIONAL
    EXPOSURE TO NOISE.  THE AMENDMENT IMPOSES REQUIREMENTS FOR
    HEARING CONSERVATION PROGRAMS.  THE ALTERNATIVES CONSIDERS
    1) REVISION OF THE PERMISSIBLE EXPOSURE LIMITS FOR NOISE*
    2) INITIATION OF HEAPING CONSERVATION PROGRAMS AT HIGHER OR
    LOWER LEVELS, 3) REVISION OF THE MONITORING, TESTING* AND
    TRAINING PROVISIONS* AND 4) NO REGULATORY ACTION.
    COMMENTS MADE BYl USDA HEN  DOT  DOI  STAT DOD  HUD  EPA  CEQ
    ERDA
                      GROUPS AND  INDIVIDUALS
    (EIS ORDER * 810008)

-------
                              -51-

              DEPARTMENT OF TRANSPORTATION

CONTACTl      MR. MARTIN CONVI8SER, DIRECTOR
              OFFICE OF ENVIRONMENT AND SAFETY
              U.S. DEPARTMENT OF TRANSPORTATION
              400 7TH STREET* S.W.
              WASHINGTON, O.C. 20590
              (202) 426*4357

              FEDERAL AVIATION ADMINISTRATION

FINAL                                                      DATE

    DULLES ACCESS HIGHWAY EXTENSION* 1-66 INTERCHANGE      01/23

    VIRGINIA
    COUNTYI        FAIRFAX
    THE PROPOSED DULLES ACCESS HIGHWAY EXTENSION (DANE) LOCATED
    IN FAIRFAX COUNTY, VIRGINIA, WILL BE A FOUR-IANE DIVIDED
    HIGHWAY, EXTENDING THE EXISTING HIGHWAY FROM THE VICINITY
    OF SPRING HILL ROAD NEAR TYSONS CORNER, 3-1/2 MILES SOUTH.
    EASTERLY TO AN INTERCHANGE WITH 1*66 IN THE VICINITY OF
    HAYCOCK ROAD NEAR THE CITY OF FALLS CHURCH.  IN ADDITION,
    OUTER PARALLEL ROADWAYS FROM VA-7 TO 1-495 ARE INCLUDED IN
    THIS PROPOSAL AS A TOLL FACILITY.  THE PROPOSED ROADWAYS
    WILL HAVE INTERCHANGES WITH SIX CROSSROADS!  VA-7, SPRING
    HILL ROAD, 1-495, VA-123, MAGARITY ROAD AND 1*66.
    COMMENTS MADE BYl DOT  DOI  EPA  DOE
                      STATE AND LOCAL AGENCIES
                      GROUPS, INDIVIDUALS AND BUSINESSES
    (EIS ORDER * 810064)
              FEDERAL HIGHWAY ADMINISTRATION

DRAFT                                                      DATE

    US 27 BYPASS OF DECATUR                                01/06

    INDIANA
    COUNTY!        ADAMS
    PROPOSED IS THE RELOCATION OF US 27 TO CREATE A BYPASS OF
    THE CITY OF DECATUR0IN ADAMS COUNTY,  INDIANA.  THE BYPASS
    WOULD EXTEND FROM 0.5 MILE SOUTH OF THE INTERSECTION OF
    US 27 AND IN-124 TO US 27/US 33, AND  VARY FROM 9.4 TO 12.7
    MILES DEPENDING ON THE ALTERNATIVE CHOSEN.  THE ALTERNATIVES
    CONSIDERED ARE!  1) CONSTRUCTION ON A NEW ALIGNMENT WEST OF
    DECATUR, 2) CONSTRUCTION ON A NEW ALIGNMENT EAST OF DECATUR,
    AND 3) WIDENING AND UPGRADING OF THE  EXISTING ALIGNMENT.
    (FHWA-IND-EIS-79-05-D)
    (EIS ORDER * 810014)


    US 50/301, 1-95 TO VICINITY OF  SOUTH  RIVER BRIDGE      01/26

    MARYLAND
    COUNTY!        ANNE ARUNDEL   PRINCE  GEORGES

-------
                               -52-

    PROP08ED  IS THE IMPROVEMENT OF US 50/301 FROM 1-95 TO THE
    VICINITY  OF THE SOUTH RIVER BRIDGE IN ANNE ARUNDEL AND
    PRINCE GEORGE'S COUNTY, MARYLAND.  IMPROVEMENT OF THE
    FACILITY  WOULD COMPLETE A LINK OF PROPOSED 1-95.  FOUR
    ALTERNATIVES ARE CONSIDERED.  THE COOPERATING AGENCY IS
    THE STATE OF MARYLAND.
    (FHWA-MD-EIS-81-01-D)
    (EIS ORDER 0 610077)
 DRAFT                                                      DATE

    us 70 IMPROVEMENTS* PORTALES-CLOVIS SECTION            01/02

    NEW MEXICO
    COUNTYl        ROOSEVELT      CURRY
    PROPOSED  IS THE IMPROVEMENT OF THE PORTALES.CLOVIS SECTION
    OF US 70  IN ROOSEVELT AND CURRY COUNTIES* NEW MEXICO.
    IMPROVEMENT ALTERNATIVES IN THE PORTALES SUBSECTION INCLUDE
    CONSIDERATION OF NO ACTION AND THREE RELIEF ROUTES ON NEW
    LOCATION.  ALTERNATIVES CONSIDERED FOR THE CLOVI8 SECTION
    INCLUDE NO ACTION* WIDENING THE EXISTING ROUTE AND TWO
    RELIEF ROUTES SOUTHEAST OF THE EXISTING ROUTE.
    (FHWA-NM-EIS-80-03-D)
    (EIS ORDER * 610001)
    OHIO RIVER BRIDGE CONSTRUCTION                         01/21

    OHIO           KENTUCKY
    PROPOSED IS THE CONSTRUCTION OF A NEW OHIO RIVER BRIDGE IN
    THE VICINITY OF PORTSMOUTH, SCJOTO COUNTY* OHIO AND SOUTH
    SHORE* GREENUP COUNTY* KENTUCKY.  THE PREFERRED ALTERNATIVE
    WOULD INVOLVE THE CONSTRUCTION OF A TWO LANE BRIDGE AND
    APPROACHES APPROXIMATELY 1.1 MILES DOWNSTREAM OF THE
    EXISTING BRIDGE.  THE COOPERATING AGENCIES ARE THE COE*
    USCG* DOI* FSW AND HCRS.
    (FHWA-OH-E18-80-02-D)
    (EIS ORDER * 810050)



FINAL                                                      DATE

    SOUTH FAIRBANKS EXPRESSWAY                             01/12

    ALASKA
    PROPOSED IS CONSTRUCTION OF THE SOUTH FAIRBANKS EXPRESSWAY
    BETWEEN PARKS HIGHWAY AND RICHARDSON HIGHWAY IN FAIRBANKS*
    ALASKA.  THE FACILITY WOULD BE A LIMITED ACCESS* FOUR-LANE
    HIGHWAY WITH TWO TERMINAL AND THREE INTERMEDIATE INTER*
    CHANGES AT UNIVERSITY AVENUE* PEGER ROAD* AND LATHROP
    STREET.  ALIGNMENT ALTERNATIVES RANGE FROM 4.3 TO 5.3 MILES
    IN LENGTH.  THE ALTERNATIVES CONSIDERl  1) NO ACTION* 2)
    FOUR ALIGNMENT ALTERNATIVES* 3) POSTPONE ACTION* 4) PHASE
    DEVELOPMENT* AND 5) DEVELOPMENT OF OTHER MODES OF TRANSPOR-
    TATION.  THE COOPERATING AGENCY IS THE STATE OF ALASKA.
    (FHWA-AK-EIS-BO-2-F)
    COMMENTS MADE BYl DOT  HUD  DOI  EPA  COE  DOC
                      STATE AGENCIES
                      BUSINESSES
    (EIS ORDER # 810024)

-------
FINAL                          ~53~                         DATE

    1-565,  1-65  TO  OAKHOOD  AVE/ANDREW  JACKSON  MAY  F-2      01/21

    ALABAMA
    COUNTYI        LIMESTONE       MADISON
    PROPOSED  IS  THE CONSTRUCTION  OF  1-565  FROM 1-65  TO  THE
    VICINITY  OF  OAKHOOD  AVENUE  AND ANDREW  JACKSON  WAY  IN  THE
    CITY  OF HUNTSVILLE  IN MADISON AND  LIMESTONE COUNTIES,
    ALABAMA.   THE  FACILITY  WOULD  BE  A  4  TO 6 LANE,  LIMITED
    ACCESS, INTERSTATE  HIGHWAY  EXTENDING FOR 21 MILES.  THE
    ALTERNATIVES CONSIDER!   1)  ALTERNATE ALIGNMENTS, 2) NO
    ACTION, 3)  MASS TRANSIT,  fl) POSTPONEMENT,  AND  5) A  REDUCED
    FACILITY.  THE  STATEMENT  FINALIZES SECTION 3 OF  THE PROJECT
    FROM  JORDEN LANE TO HUNTSVILLE.   A PREVIOUS FINAL  EIS,
    0780341,  WAS FILED  4-7-76 CONCERNING SECTIONS  1  AND 2 FROM
    1-65  TO JORDEN LANE.
    (FHWA-ALA-EIS-72-08-F)
    COMMENTS  MADE  BYS USDA  HUD  EPA   HEW  DOT   DOI  TVA  COE   AHP
                      STATE AND LOCAL AGENCIES
                      GROUPS
    CEIS  ORDER * 810056)


    U.S.  HIGHWAY 24 BYPASS, COLORADO SPRINGS                01/19

    COLORADO
    COUNTYI        EL PASO
    PROPOSED IS THE RELOCATION OF US 24 THROUGH THE CITY  OF
    COLORADO SPRINGS, EL PASO COUNTY, COLORADO.  THE NEW
    FACILITY WOULD EXTEND FROM THE MIDLAND EXPRESSWAY TO
    EXISTING US 24.  INTERCHANGES WOULD BE PLACED AT ACADEMY
    BOULEVARD, POWERS AND AIRPORT, POWERS  AND PLATTE, AND WITHIN
    AN AREA WEST OF CIRCLE.  IN ADDITION TO NO ACTION SIX BUILD
    ALTERNATIVES ARE CONSIDERED.
    (FHWA-COLO-EIS-75-02-F)
    COMMENTS MADE  BY! DOT  FEA  USDA HUD  DOI  EPA
                      STATE AND LOCAL AGENCIES
                      GROUPS,  INDIVIDUALS AND BUSINESSES
    (EIS ORDER 0 810047)


    AUGUSTA  RAILROAD DEMONSTRATION PROJECT                 01/28

    GEORGIA         SOUTH CAROLINA
    COUNTYI         RICHMOND       COLUMBIA       AIKEN
    PROPOSED IS A  RAILROAD DEMONSTRATION  PROJECT FOR THE AUGUSTA
    METROPOLITAN AREA WHICH ENCOMPASSES ALL OR  A PORTION OF
    RICHMOND AND COLUMBIA  COUNTIES, GEORGIA,  AND THE CITY OF
    NORTH  AUGUSTA  AND AIKEN COUNTY, SOUTH CAROLINA.  THIS
    STATEMENT CONCERNS  ONLY ONE  OF THE  THREE  RAIL SYSTEMS
    SERVING  THE AREA.   THE PREFERRED  ALTERNATIVE WOULD REMOVE
    INTERCHANGE MOVEMENTS  FROM DOWNTOWN AUGUSTA AND RETAIN THE
    EXISTING MAIN  LINE  WEST OF THE CENTRAL AREA.  THE  OTHER
    ALTERNATIVES CONSIDERED  AREI  1)  LIMITED  BUILD, 2) NO
    ACTION,  AND 3) POSTPONEMENT.  THE COOPERATING AGENCY IS THE
    STATE  OF GEORGIA.
    (FHWA-GA-EIS-78-02-F)
    COMMENTS MADE  BY! USDA HUD  DOI  HEW  EPA  COE  DOT  FEA
                      STATE AND LOCAL AGENCIES
                      BUSINESSES
    (EIS ORDER 0 610092)

-------
                               -54-
FINAL                                                       DATE


    I-SIO SPUR, GULF OUTLET BRIDGE TO 1-10                 01/27

    LOUISIANA
    COUNTYl        ORLEANS
    PROPOSED IS THE CONSTRUCTION OP THE GULF  OUTLET  BRIDGE INi.
    TERSTATE TO BE KNOWN AS 1-510, LOCATED  IN ORLEANS  PARISH,
    LOUISIANA.  THE PROPOSED ACTION FOR MOVING PEOPLE  AND
    FREIGHT 18 A 2.5 MILE, FOUR-LANE CONTROLLED-ACCESS HIGHWAY
    BEGINNING AT THE NORTH END OF  THE EXISTING MISSISSIPPI
    RIVER GULF OUTLET BRIDGE AND ENDING AT  1-10.   A  SIX-LANE
    ROADWAY IS PROVIDED FROM 1-10  TO LAKE FOREST  BOULEVARD TO
    ACCOMODATE WEAVING MOVEMENTS.  THE ALTERNATIVES  CONSIDER
    NO-BUILD, MASS TRANSIT, AND LOCATION ALTERNATIVES.
    (FHWA-LA-EIS»78*2-F)
    COMMENTS MADE BY:  EPA NOAA DOI  COE  USDA USCG
                     STATE AND LOCAL AGENCIES
                     GROUPS, INDIVIDUALS, AND BUSINESSES
    (EIS  ORDER ft 810051)


    1-97, BALTIMORE/ANNAPOLIS CORRIDOR STUDY               01/26

    MARYLAND
    COUNTYl        ANNE ARUNDEL
    PROPOSED ARE VARIOUS IMPROVEMENTS FOR THE BALTIMORE/
    ANNAPOLIS TRANSPORTATION CORRIDOR FROM  THE BALTIMORE BELTWAY
    TO ANNAPOLIS IN ANNE ARUNOEL COUNTY, MARYLAND.  THE IMPROVE-
    MENTS INCLUDE|  1) UPGRADING PORTIONS OF  THE  BALTIMORE
    BELTWAY, MD-3, MD-32 AND US 50/301 TO INTERSTATE STANDARDS!
    2) CONSTRUCTION OF 6 MILES OF  NEW HIGHWAY TO  COMPLETE  THE
    LINK TO US 50/3011 3) MINOR IMPROVEMENTS  FOR  MD-2  AND
    MD-lOOl 4) 9 MILES OF HOV LANES* 5) 4 PARK.AND«RIDE LOTS I
    AND 6) 3 CARPOOL LOTS.  THE COOPERATING AGENCY IS  THE  STATE
    OF MARYLAND.
    (FHWA-MD-EI8-78-02-F)
    COMMENTS MADE  BYt DOC  COE  DOI  EPA  DOT
                      STATE AND LOCAL AGENCIES
                      INDIVIDUALS
    (EIS ORDER » 610079)


    1-696, LAHSER  ROAD TO 1-75                             01/21

    MICHIGAN
    COUNTYl        OAKLAND
    PROPOSED IS THE CONSTRUCTION OF  1-696 FROM LAHSER  ROAD TO
    1-75 IN OAKLAND COUNTY, MICHIGAN.  THE  8  MILE SEGMENT  WOULD
    COMPLETE 1-696 PROVIDING FULL  EAST-WEST FREEWAY  SERVICE.
    THE FACILITY MOULD HAVE 3 OR 4 LANES IN EACH  DIRECTION AND
    SERVICE ROADS  ALONG MOST OF ITS  ROUTE.  THE ALTERNATIVES
    CONSIDERED AREl  1) NO ACTION, 2) UPGRADING EXISTING ROADS,
    3) OTHER MODES OF TRANSPORTATION, AND 4)  VARIOUS OTHER URBAN
    FREEWAY ALIGNMENTS.  THE COOPERATING AGENCY IS THE STATE  OF
    MICHIGAN.
    (PHWA-MICH-EIS-72-03-F)
    COMMENTS MADE BY: DOT DOC  USDA DOI  EPA COE  EDA
                    STATE AND LOCAL AGENCIES
                    INDIVIDUALS
    (EIS  ORDER ft 810049)

-------
                              -55-
FINAL                                                       DATE

    1-76 COMPLETION, 1-78 TO BALTU8ROL ROAD                 01/24

    NEW JERSEY
    COUNTY!         SOMERSET       UNION
    PROPOSED IS THE COMPLETION OF 1-78 FROM  THE  PRESENT  TERMINI
    OF 1-78  IN THE VICINITY OF PLAINFIELD  AVENUE IN BERKELEY
    HEIGHTS  TO THE VICINITY OF BALTUSROL ROAD  IN SPRINGFIELD
    AND WITHIN THE COUNTIES OF SOMERSET AND  UNION!,  NEW  JERSEY.
    THE FACILITY WOULD BE A SIX-LANE, CONTROLLED ACCESS  FREEWAY
    EXTENDING FOR 5.5 MILES.  IN  ADDITION  TO NO  BUILD,  EIGHT
    ALTERNATIVES ARE CONSIDERED.
    (FHWA-NJ-EIS-76-02-F)

    COMMENTS MADE BYl USDA DOC  DOI  HUD   DOT   EPA   COE
                      STATE AND LOCAL AGENCIES
    (EIS ORDER * 610018)


    LATHAM-MOHAWK RIVER INTERCHANGE* ALTERNATE ROUTE 7      01/21

    NEW YORK
    COUNTY!         ALBANY
    THE PROPOSED PROJECT* ALTERNATE ROUTE  7, LOCATED IN ALBANY
    COUNTY,  NEW YORK, IS A FOUR LANE DIVIDED FREEWAY WITH AN
    ADDITIONAL CLIMBING LANE IN THE WESTBOUND  DIRECTION.
    BEGINNING IN THE VICINITY OF  THE PRESENT PARTIALLY  CON-
    STRUCTED EXIT 7 OF ROUTE I-B7 IN LATHAM, THE PROJECT PRO-
    CEEDS EASTWARD TO THE EXISTING  INTERCHANGE WITH ROUTE 1-787
    IN MAPLEWOOD.  A MAJOR FEATURE  WILL BE AN  INTERCHANGE WHICH
    WILL ALLOW TRAFFIC FLOW BETWEEN THE PROJECT  AND ROUTES 1-87
    AND US 9.
    (FHWA-NY-EIS-78-02-F)


    COMMENTS MADE BY! DOT  AHP  USDA DOI   EPA   NRC
                      STATE AND LOCAL AGENCIES
                      GROUPS, INDIVIDUALS  AND  BUSINESSES
    (EIS ORDER * 610053)


    1-481 EXTENSION, COLLAMER TO  BEAR ROAD                 01/27

    NEW YORK
    COUNTY!         ONONDAGA
    PROPOSED IS THE EXTENSION OF  1-481  FROM THE COLLAMER/NEW
    YORK STATE THHUWAY ROAD/I-81  INTERCHANGE TO THE BEAR ROAD/
    1-81 INTERCHANGE IN ONONDAGA  COUNTY,  NEW YORK.  THE FACILITY
    WOULD BE A FOUR LANE DIVIDED  EXPRESSWAY EXTENDING FOR 5.4
    MILES.  ALSO TO BE COMPLETED ARE THE RAMPS AT THE BEAR  ROAD/I-81
    INTERCHANGE.  THE COOPERATING AGENCY IS THE STATE OF NEW YORK.
    (FHWA-NY-EIS-76-01-F)
    COMMENTS MADE BY:  USDA HEW  DOI   FPC EPA  DOT COE
                    STATE AND LOCAL AGENCIES
    (EIS ORDER # 810081)

-------
                              -56-
FINAL                                                       DATE



   CIRCLE BOULEVARD,  IMPROVEMENT/EXPANSION                    01/13

   OREGON
   COUNTYl         8ENTON
   PROPOSED  IS  THE IMPROVEMENT  AND  EXTENSION  OF  NW  CIRCLE
   BOULEVARD FROM  NW  LANTANA  DRIVE  TO  NW WHITMAN HILL  DRIVE*
   CITY OF CORVALLIS,  BENTON  COUNTY, OREGON.   THE EXTENSION
   WOULD CONSIST OF TWO LANES FOR 0.35 MILE,  A LEFT TURN LANE
   AT THE INTERSECTION OF  WHITMAN HILL DRIVE,  AND A BIKEPATH
   FROM NW ARBOL PLACE TO  WHITMAN HILL DRIVE.  THE  ALTERNATIVES
   CONSIDER  NO  BUILD  AND A MODIFIED BUILD  ALTERNATIVE.  ALSO
   ADDRESSED IS THE FUTURE CONSTRUCTION OF A  0.75 MILE  NW
   CIRCLE BOULEVARD SECTION BETWEEN NW HARRISON  BOULEVARD  AND
   NW WHITMAN HILL DRIVE.   THE  COOPERATING AGENCY IS THE STATE
   OF OREGON.
    (FHWA-OR-EIS-79-04-F)
   COMMENTS  MADE BY!  DOE   EPA  001   USDA
                      STATE AGENCIES
                      INDIVIDUALS
    (EIS ORDER * 810026)


   ISLE OF PALMS CONNECTOR, SC-703  TO  US 17/701            01/21

   SOUTH CAROLINA
   COUNTYl         CHARLESTON
   PROPOSED  IS  THE CONSTRUCTION OF  A NEW HIGHWAY CONNECTOR
   WHICH WILL EXTEND  FROM  THE ISLE  OF  PALM (HIGHWAY 703) TO US
   17/701 IN CHARLESTON COUNTY,  SOUTH  CAROLINA.   THE PROJECT
   LENGTH IS APPROXIMATELY 3.66 MILES. THE ENTIRE  FACILITY
   WILL INITIALLY  BE  TWO LANES,  WILL BE ON A  BRIDGE STRUCTURE
   FOR THE LIMITS  OF  THE WETLANDS IT WILL  TRAVERSE, WILL
   UTILIZE NORMAL  CUT AND  FILL  CONSTRUCTION OPERATIONS  ON  THE
   MAINLAND  AND ISLE  OF PALMS,  AND  MILL INVOLVE  NEW CONSTRUC-
   TION WITHIN  A NEW  ROADWAY  CORRIDOR. IT IS PROPOSED  THAT THE
   ROADWAY BE LOCATED WITHIN  A  FOUR LANE HIGHWAY RIGHT-OF-WAY.
   (FHWA-SC-EIS-79-02-D)
   COMMENTS  MADE BYl  EPA   DOI  COE   DOT DOC   USPS
                      STATE AND  LOCAL AGENCIES
   (EIS ORDER * 610055)


   ROUTE 234 BYPASS CONSTRUCTION, MANASSAS                01/26

   VIRGINIA
   COUNTYl         PRINCE WILLIAM
   PROPOSED  IS  THE CONSTRUCTION OF  A BYPASS FACILITY AROUND THE
   CITY OF MANASSAS IN PRINCE WILLIAM  COUNTY, VIRGINIA FOR
   EXISTING  ROUTE  234. THE CORRIDOR EXTENDS  FROM THE  INTER-
   SECTION OF ROUTE 619 AT INDEPENDENT HILL ON THE  SOUTH TO THE

-------
                              -57-
    INTEPSECTION OF US 15 AT WOOLSEY.  THE PROJECT LENGTH MOULD
    VARY  FROM 1«.76 MILES TO 21.77 MILES, DEPENDING UPON WHICH
    ALTERNATIVE IS SELECTED.  ALL BYPASS ALTERNATIVES ARE ON THE
    WEST  SIDE OF THE CITY OF MANAS8AS.  THE COOPERATING AGENCY
    IS  THE STATE OF VIRGINIA.
    (FHWA-VA-EI8-79-03-F)
    COMMENTS MADE BYl EPA  DOT  DOT  COE  DOC  HUD
                      STATE AND LOCAL AGENCIES
                      BUSINESSES
    (EIS  ORDER it 810078)

FINAL                                                       DATE

    CONNECTICUT RIVER BRIDGE CROSSING                      01/21

    VERMONT        NEW HAMPSHIRE
    COUNTYl        WINDHAM        CHESHIRE
    PROPOSED IS THE CONSTRUCTION OF A BRIDGE CROSSING THE
    CONNECTICUT RIVER BETWEEN ROCKINGHAM, WINDHAM COUNTY,
    VERMONT AND HALPOLE,  CHESHIRE COUMTY, NEW HAMPSHIRE.  THE
    ALTERNATIVES CONSIDER, IN ADDITION TO NO BUILD, IMPROVEMENT
    OF  THE EXISTING BRIDGE AND FIVE LOCATIONS FOR THE CONSTRUC-
    TION  OF A NEW BRIDGE.  A NEW BRIDGE WOULD CONSIST OF A 40
    FOOT  ROADWAY WITH ONE SIX FOOT SIDEWALK AND WOULD BE EITHER
    A  THREE SPAN GIRDER OR AN ARCH SPAN.
    (FHWA-NH-EIS-79-02-F)
    COMMENTS MADE BYl EPA  DOI  HUD  AHP  USDA FPC  DOC
                      STATE AND LOCAL AGENCIES
                      GROUPS
    (EIS  ORDER » 810052)


    WA-5, TROSPER ROAD TO MARTIN WAY INTERCHANGE           01/23

    WASHINGTON
    COUNTYl        THURSTON
    THE PROPOSED ACTION INVOLVES IMPROVEMENT TO WA-5 WHICH IS A
    MAJOR NORTH-SOUTH ROUTE FROM THE MEXICAN BORDER TO THE
    CANADIAN BORDER ON THE WEST COAST.  IT CONNECTS THE CITIES
    OF  PORTLAND, OLYMPIA, TACOMA, SEATTLE AND VANCOUVER, IN THE
    PACIFIC NORTHWEST.  THE PROPOSED IMPROVEMENTS CONSIST
    OF  IMPROVING A 6.5 MILE SECTION OF WA-5 FROM TROSPER ROAD
    INTERCHANGE TO MARTIN WAY INTERCHANGE.  THE IMPROVEMENTS IN-
    VOLVE WIDENING THE EXISTING ALIGNMENT FROM FOUR TO SIX LANES
    FROM  CAPITOL LAKE INTERCHANGE TO MARTIN WAY INTERCHANGE AND
    CONSTRUCTION OF AUXILIARY LANES FOR OPERATIONAL IMPROVEMENTS
    IN SOME LOCATIONS.  THE  PROJECT IS LOCATED IN THURSTON COUNTY, WASHINGTON
    (FHWA-WA-EIS-78-01-F)
    COMMENTS MADE BYt DOT  EPA  USDA DOI  HUD  DOE  COE
                      STATE AND LOCAL AGENCIES
                      INDIVIDUALS
    (EIS  ORDER * 810066)

-------
                              -58-
DRAFT SUPPLEMENT                                             DATE

    US 395, WINTERS' RANCH TO SOUTH VIRGINIA 3T/I-S80      01/26

    NEVADA
    COUNTYt         NASHOE
    THIS STATEMENT  SUPPLEMENTS  A  FINAL EIS* *770379, PILED
    3-23-77.  PROPOSED  IS IMPROVEMENT OF US 395 FROM WINTERS'
    RANCH TO THE SOUTH  VIRGINIA STREET/1-580 INTERCHANGE
    IN RENO* HASHOE COUNTY* NEVADA.'  THE IMPROVED SEGMENT WOULD
    EXTEND FOR  16 MILES.  FIVE  ALTERNATIVES ARE CONSIDERED.  TWO
    ALTERNATIVES FOLLOW THE EXISTING ALIGNMENT WHILE TWO ALTER-
    NATIVE ALIGNMENTS TRANSVERSE  THE LOWER SLOPES OF THE CARSON
    RANGE.  NO  ACTION xs ALSO CONSIDERED.
    (FHWA-NV-EIS-76-02-DS01)
    (EIS ORDER  * 810076)

FINAL SUPPLEMENT                                             DATE
    1-505, NW NICOLAI STREET TO 1-405, PORTLAND            01/16

    OREGON
    COUNTYl         MULTNOMAH
    THIS STATEMENT  SUPPLEMENTS  A  FINAL EIS* 0770901* FILED
    7*25-77 CONCERNING  THE CONSTRUCTION OF 1-505  IN THE  CITY
    OF PORTLAND* MULTNOMAH COUNTY* OREGON.  THE DECISION HAS
    BEEN MADE NOT TO BUILD 1-505.  THIS STATEMENT PROPOSES A
    FREEWAY CONNECTION  BETWEEN  1-405 AND THE INTERSECTION OF
    NICOLAI STREET  AND  YEON AVENUE.'  FROM THAT INTERSECTION US
    30 TRAFFIC  WOULD USE YEON AVENUE WHICH WOULD  BE WIDENED TO
    FIVE LANES.  THE NUMBER OF  RAIL CROSSINGS ON  YEON  AVENUE
    WOULD BE REDUCED TO ONE.  MAJOR IMPROVEMENTS  WOULD OCCUR ON
    ST. HELENS  ROAD* WARDWAY* VAUGHN STREET AND NICOLAI STREET.
    (FHWA-OR-EI8-78-08-FS)
     COMMENTS MADE BY:  DOI  DOC
                     STATE AND LOCAL AGENCIES
     (EIS ORDER #  810037)
              U.S.COAST GUARD

FINAL                                                      DATE
    MISSISSIPPI RIVER BRIDGE* GRAMERCY  TO  WALLACE          01/22
    LOUISIANA
    COUNTYl         ST.JAMES        ST. JOHN BAPTI
    PROPOSED IS THE CONSTRUCTION  OF  THE MISSISSIPPI RIVER
    BRIDGE BETWEEN  THE CITIES OF  GRAMERCY  IN ST. JAMES PARISH
    AND WALLACE IN  ST. JOHN THE BAPTIST PARISH* LOUISIANA.   THE
    BRIDGE WOULD BE FOUR LANES WITH  UNCONTROLLED ACCESS
    APPROACHES  CONNECTING  LA-3127 ON THE WEST  BANK  AND US  61
    ON THE EAST BANK.  FOUR CONSTRUCTION AND 3 NONCONSTRUCTION
    ALTERNATIVES  ARE  CONSIDERED.
    COMMENTS MADE  BYl USDA DOT   EPA   DOC  HUD   DOI   AHP
                      STATE AND  LOCAL AGENCIES
                      GROUPS  AND  BUSINESSES
    (EIS  ORDER  *  810060)

-------
                              -59-

              ENVIRONMENTAL PROTECTION AGENCY


              EPA, HEADQUARTERS

DRAFT                                                      DATE

    BENZENE STORAGE TANK EMISSIONS, STANDARDS              01/07

    REGULATORY
    PROPOSED ARE BENZENE EMISSIONS STANDARDS WHICH NOULD LIMIT
    EMISSIONS FROM EXISTING AND NEW STORAGE TANKS.  SEVERAL
    CONTROL OPTIONS ARE CONSIDERED BOTH FOR NEW AND EXISTING
    PLANTS INCLUDING NO ADDITIONAL STANDARD AND THE PROHIBITION
    PLANTS INCUDING NO ADDITIONAL STANDARD AND THE PROHIBITION
    OF BENZENE TANKS.  THE OTHER OPTIONS ADDRESS THE POSSIBLE  .
    USE OFl  1) INTERNAL FLOATING ROOFS (CONTACT OR NONCONTACT)*
    2) SECONDARY SEALS, 3) CONTACT INTERNAL FLOATING ROOFS WITH
    LIQUID-MOUNTED PRIMARY SEALS AND A CONTINUOUS SECONDARY
    SEAL, AND 4) VAPOR CONTROL SYSTEMS.
    (EPA-450/3-80-034A)
    CEIS ORDER * 810011)


    SYNTHETIC ORGANIC CHEMICALS EMISSIONS, STANDARDS       01/12

    REGULATORY
    PROPOSED ARE PERFORMANCE STANDARDS THAT WOULD LIMIT
    EMISSIONS OF VOLATILE  ORGANIC COMPOUNDS FROM NEW,  MODIFIED,
    AND RECONSTRUCTED UNITS IN THE SYNTHETIC ORGANIC CHEMICALS
    MANUFACTURING  INDUSTRY.  THE STANDARDS WOULD REDUCE
    EMISSIONS FROM PUMPS,  COMPRESSORS, VALVES, SAFETY/RELIEF
    VALVES, SAMPLING CONNECTIONS,  AND OPEN-ENDED LINES.   FUGI-
    TIVE EMISSIONS FROM AFFECTED FACILITIES WOULD BE 200
    GXGAGRAMS (GG)XYR UNDER ALTERNATIVE 1  (NO  ACTION)  AND 73*
    62 AND 26 GG/YR UNDER  ALTERNATIVES 2* 3 AND 4, RESPECTIVELY.
    (EPA-450/3-6033A)
    (EIS ORDER * 810031)


    INDUSTRIAL SURFACE COATING-APPLIANCES, STANDARDS       01/12

    REGULATORY
    PROPOSED ARE PERFORMANCE STANDARDS LIMITING VOC EMISSIONS
    FROM NEW, MODIFIED AND RECONSTRUCTED  APPLIANCE SURFACE
    COATING OPERATIONS.   THREE REGULATORY  ALTERNATIVES ARE
    CONSIDERED FOR PRIME  COAT  OPERATIONS  AND FOUR FOR  TOPCOAT
    OPERATIONS.   THE FIRST TWO FOR BOTH AREi   1)  STATE REGULA.
    TIONS  ONLY, AND 2) NO  NSPS.  THE  ADDITIONAL ALTERNATIVE  FOR
    PRIME  COAT OPERATIONS  WOULD  LIMIT EMISSIONS TO THOSE  OF
    WATERBORNE PRIME COATS APPLIED BY ELECTRODEP08ITION.   FOR
    TOPCOAT OPERATIONS THE ALTERNATIVES AREl   1)  30X REDUCTION
    THROUGH USE OF VARIOUS LEVELS  OF  SOLIDS  COATINGS AND/OR
     INCINERATION,  AND  2)  EMISSION  ELIMINATION BY USE OF POWDER
    COATINGS.   (EPA-450/3-SO-037A)
     (EIS ORDER *  810022)

-------
DRAFT                          '-

    BENZENE FUGITIVE EMISSIONS, STANDARDS                  01/14

    REGULATORY
    PROPOSED ARE EMISSION STANDARDS WHICH MOULD LIMIT FUGITIVE
    EMISSIONS OF BENZENE FROM EXISTING AND NEW PETROLEUM REFIN-
    ING AND CHEMICAL MANUFACTURING UNITS.  SIX REGULATORY ALTER-
    NATIVES ARE CONSIDERED WHICH EMPLOYEE VARIOUS COMBINATIONS
    OF THE AVAILABLE CONTROL TECHNIQUES IN THE AFFECTED INDUSTRY
    WHICH REFLECT INCREASING LEVELS OF EMISSION REDUCTION AND
    RANGE FROM REQUIRING NO NEW CONTROLS TO ELIMINATING ALL
    BENZENE FUGITIVE EMISSIONS.
    (EPA-450/3-80-032A)
    (EIS ORDER * 810028)


    PERCHLOROETHYLENE DRY CLEANER EMISSION STANDARDS       01/14

    REGULATORY
    PROPOSED ARE PERFORMANCE STANDARDS FOR TETRACHLOROETHYLENEr
    MORE COMMONLY KNOWN AS PERCHLOROETHYLENE (PERC)  DRY
    CLEANERS.  PERC DRY CLEANERS ARE GENERALLY DIVIDED INTO
    THREE CATEGORIESl  COIN-OPERATED* COMMERCIAL AND INDUSTRIAL.
    TWO REGULATORY ALTERNATIVES* EACH OF WHICH VARY  ACCORDING TO
    INDUSTRY CATEGORY ARE CONSIDERED.
    (EPA-450/3-79-029A)
    (EIS ORDER * 810029)


    METAL COIL SURFACE COATING INDUSTRY, EMISSIONS         01/19

    REGULATORY
    PROPOSED ARE PERFORMANCE STANDARDS THAT WOULD LIMIT
    EMISSIONS OF VOLATILE ORGANIC COMPOUNDS FROM NEW,  MODIFIED
    AND RECONSTRUCTED METAL COIL SURFACE COATING OPERATIONS.
    FIVE REGULATORY ALTERNATIVES ARE CONSIDERED WHICH INCLUDE
    NO ACTION, THE USE OF THE BEST AVAILABLE EMISSION CONTROL
    DEVICE IN CONJUNCTION WITH CURRENT INDUSTRY PRACTICE OR WITH
    ENCLOSED APPLICATION ROOMS, AND TWO ALTERNATIVES WHICH WOULD
    IMPOSE HIGHER EMISSION LIMITS FOR THOSE PLANTS THAT USE LOW-
    VOC CONTENT COATINGS.
    (EPA-450/3-80-035A)
    (EIS ORDER * 810044)


    TAPE AND LABEL SURFACE COATING INDUSTRY, STANDARDS     01/22

    REGULATORY
    PROPOSED ARE PERFORMANCE STANDARDS WHICH WOULD LIMIT
    EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (VOC) FROM NEW,
    MODIFIED AND RECONSTRUCTED PRESSURE SENSITIVE TAPE AND
    LABEL SURFACE COATING FACILITIES.  THREE ALTERNATIVES CON.
    SIDERl  1) NO NEW SOURCE PERFORMANCE STANDARD RESULTING IN
    AN SOX REDUCTION OF OVERALL VOC EMISSIONS! 2) LIMITING VOC
    EMISSIONS FROM DRYING OVENS ONLY, RESULTING IN AN 85X
    REDUCTION) AND 3) CONTROL OF BOTH DRYING OVEN AND FUGITIVE
    VOC EMISSIONS RESULTING IN A 90% REDUCTION.
    (EPA-450/3-80-003A)
    (EIS ORDER * 810057)

-------
                              -Gl-


FINAL

    MOTORCYCLE NOISE EMISSION REGULATIONS                  01/02

    PROPOSED ARE NOISE REGULATIONS FOR MOTORCYCLES AND MOTOR-
    CYCLE EXHAUST SYSTEMS.  THE REGULATIONS WOULD REQUIRE THAT
    ALL STREET AND OFF-ROAD MOTORCYCLES WITH AN ENGINE DISPLACE*
    MENT OF 170 CC AND LESS, MANUFACTURED AFTER 1-1-83, NOT EMIT
    A NOISE LEVEL IN EXCESS OF 83 DECIBELS.  LOWER LEVELS OF
    NOISE EMISSIONS ARE REQUIRED AS OF 1*1-66.
    COMMENTS MADE BYl
                      BUSINESSES
    (EI8 ORDER * S10000)


    AUTO/LIGHT-DUTY TRUCK SURFACE COATING OPERATIONS       01/19

    REGULATORY
    PROPOSED ARE STANDARDS OF PERFORMANCE FOR AUTOMOBILE AND
    LIGHT-DUTY TRUCK SURFACE COATING OPERATIONS UNDER SECTION
    III OF THE CLEAN AIR ACT.  THE STANDARDS WOULD LIMIT EMIS-
    SIONS OF VOLATILE ORGANIC COMPOUNDS FROM NEW, MODIFIED, AND
    RECONSTRUCTED FACILITIES.  NUMERICAL EMISSION LIMITS FOR
    EACH "AFFECTED FACILITY" HAVE BEEN SELECTED AS FOLLOWS!   1)
    0.10 KG OF VOC PER LITER OF APPLIED COATING SOLIDS FROM EACH
    PRIME COAT OPERATION, 2) 0.64 KG OF VOC PER LITER OP APPLIED
    COATING SOLIDS FROM EACH GUIDE COAT OPERATION, AND 3) 0.64
    KG OF VOC PER LITER OF APPLIED COATING SOLIDS FROM EACH TOP-
    COAT OPERATION.
    (EPA-450/3-79-030B)
    COMMENTS MADE BYl DOT  DLAB
                      STATE AGENCIES
                      GROUPS AND BUSINESSES
    (EIS ORDER n 810046)
              EPA, REGION  10

DRAFT                                                      DATE

    CITY OF COEUR D'ALENE  WWT FACILITIES, GRANT            01/07

    IDAHO
    COUNTYl        KOOTENAI
    PROPOSED IS THE AWARDING OF A GRANT FOR THE UPGRADING OF
    SEWAGE TREATMENT FACILITIES IN THE CITY OF COEUR D'ALENE,
    KOOTENAI COUNTY, IDAHO,  THE ALTERNATIVES CONSIDERS  1)
    UPGRADING OF EXISTING  FACILITIES AND CONSTRUCTION OF ADDI-
    TIONAL FACILITIES, 2)  CLOSURE OF EXISTING PLANT AND CON-
    STRUCTION OF A NEW TRICKLING FILTER/ACTIVATED  SLUDGE PLANT,
    AND 3) UPGRADING THE EXISTING PLANT AND CONSTRUCTION OF AN
    ADDITIONAL PLANT.  ALL OF THE ALTERNATIVES WOULD INCLUDE
    SEWER INTERCEPTOR EXTENSIONS.
    (EPA-910/9-80-076)
    (EIS ORDER « 810012)

-------
FINAL                         ~62'                          DATE

    BEND CITY SEWAGE EFFLUENT DISPOSAL                     01/13

    OREGON
    COUNTYl        DE8CHUTE3
    PROPOSED IS THE DISPOSAL OF SEWAGE EFFLUENTS FROM THE CITY
    OF BEND'S WASTENATER TREATMENT PLANT, DESCHUTES COUNTY,
    OREGON.  SIX ALTERNATIVES ARE CONSIDERED WHICH INCLUDES
    1) DISCHARGE TO DRILL HOLES OR FRACTURED ROCK, 2) DISCHARGE
    TO INFILTRATION PONDS, 3) DISCHARGE TO THE DESCHUTES RIVER,
    4) DISCHARGE TO SEALED EVAPOTRANSPIRATZON PONDS, 5) LAND
    APPLICATION BY SPRAY IRRIGATION, AND 6) DISCHARGE TO THE
    NORTH UNIT MAIN CANAL.
    (EPA-910/9-80«074)
    COMMENTS MADE BYt AHP  DOI  USDA
                      STATE AND LOCAL AGENCIES
                      BUSINESSES
    (EIS ORDER 0 810025)
              EPA, REGION 2

DRAFT                                                      DATE

    UPPER ROCKAWAY RIVER BASIN, FACILITY PLAN              01/28

    NEW JERSEY
    COUNTYl        MORRIS
    PROPOSED IS A FACILITY PLAN FOR THE CONSTRUCTION OF SEWAGE
    TREATMENT FACILITIES WITHIN THE UPPER ROCKAWAY RIVER BASIN,
    MORRIS COUNTY, NEW JERSEY.  THE RECOMMENDED PLAN INCLUDES!
    1) LOCAL COLLECTION AND TREATMENT IN CERTAIN AREAS, 2) CREA-
    TION OF TWO SEPTIC MANAGEMENT DISTRICTS, 3) CONSTRUCTION
    OF THREE BRANCH INTERCEPTORS WITH CONNECTION TO ROCKAWAY
    VALLEY REGIONAL SEWERAGE AUTHORITY (RVRSA) PLANT, AND 4) NO
    ACTION FOR VARIOUS AREAS WITHIN THE RVRSA.
    (EIS ORDER 0 810084)
              EPA, REGION 5

FINAL                                                      DATE

    STEUBEN LAKES WWT SYSTEMS, CASE STUDY 04               01/21

    INDIANA
    COUNTYl        STEUBEN

    PROPOSED  IS A WASTEWATCR  TREATMENT PLAN FOR THE STEUBEN
    LAKES REGIONAL WASTE DISTRICT LOCATED IN STEUBEN COUNTY,
    INDIANA.  THE RECOMMENDED ACTION IS THE LIMITED ACTION
    ALTERNATIVE AND  INCLUOESI  1) SITE SPECIFIC ANALYSIS OF ON-
    SITE SYSTEMS, 2) REPAIR AND RENOVATION OF ON.SITE SYSTEMS,

-------
                              -63-

    3)MANAGEMENT OF THE ON-3ITE SYSTEMS BY A SMALL WASTE FLOWS
    DISTRICT, AND a) CONTINUED MONITORING OF SURFACE MATER
    QUALITY AS NELL AS GROUND WATER QUALITY.
    COMMENTS MADE BYl HUD  DOT  USDA DOI  HEW
                      STATE AGENCIES
                      GROUPSi INDIVIDUALS AND BUSINESSES
    (EIS ORDER 0 610054)

FINAL                                                      DATE
    GREEN LAKE WASTE TREATMENT SYSTEMS* CASE STUDY 02      01/16

    MINNESOTA
    COUNTY!        KANDIYOHZ
    PROPOSED IS A WASTEWATER TREATMENT PLAN FOR THE GREEN LAKE
    SANITARY SEWER AND WATER DISTRICT LOCATED IN KANDIYOHI
    COUNTY, MINNESOTA.  SEVEN ALTERNATIVES HAVE BEEN DEVELOPED
    WHICH EVALUATE ALTERNATIVE COLLECTION SYSTEMS (PRESSURE
    SEWERS), TREATMENT TECHNIQUES (LAND APPLICATION), INDIVIDUAL
    AND MULTI«FAMILY SEPTIC SYSTEMS (CLUSTER SYSTEMS), AND WATER
    CONSERVATION.  THE GREEN LAKE STUDY AREA COMPRISES ABOUT 24
    SQUARE MILES OF FIELDS, FARMS, WETLANDS* AND RESIDENTIAL/
    COMMERCIAL LAKE-SIDE DEVELOPMENT.
    COMMENTS MADE BYl DOI  DOT
                      STATE AND LOCAL AGENCIES
                      INDIVIDUALS AND BUSINESSES
    (EIS ORDER * 810036)
              EPA, REGION 7

FINAL                                                      DATE

    MARION COUNTY SEWERAGE FACILITIES, GRANT               01/07

    KANSAS
    COUNTYl        MARION
    PROPOSED  IS THE AWARDING OR NON-APPROVAL OF FUNDING FOR THE
    CONSTRUCTION OF A CONVENTIONAL SEWAGE COLLECTION AND TREAT-
    MENT SYSTEM TO SERVE THE MARION COUNTY LAKE IMPROVEMENT
    DISTRICT, KANSAS.  THE PROJECT INCLUDES!   1) A CONVENTIONAL
    GRAVITY COLLECTION SYSTEM, AND 2) A FORCE  MAIN TO THE CITY
    OF MARION'S PROPOSED TREATMENT PLANT.  ALTERNATIVES INCLUDE!
    1) A TOTAL RETENTION LAGOON* 2) NEW ON-SITE SYSTEMS* 3)
    PRESSURE  SEWER AND VACUUM SEWER COLLECTION SYSTEMS, AND
    4) COMMUNITY LEACH FIELDS.
    (EPA-907/9-80-004)
    COMMENTS  MADE BY! COE  USDA HH8  HUD  DOI
                      STATE AGENCIES
                      INDIVIDUALS AND BUSINESSES
    (EIS ORDER 0 810013)

-------
                               -64-

              GENERAL  SERVICES ADMINISTRATION

CONTACTl      MR.  CARL «.  PENLANO
              ACTING DIRECTOR
              ENVIRONMENTAL  AFFAIRS DIVISION
              GENERAL  SERVICES ADMINISTRATION
              18TH AND F STREETS, N.N.
              WASHINGTON*  D.C. 20405
              (202) 566-1416

DRAFT                                                       DATE

    POST OFFICE  AND COURTHOUSE RENOVATION,  CHARLESTON      01/23

    SOUTH CAROLINA
    COUNTYl         CHARLESTON
    PROPOSED  IS  THE RENOVATION OF AND ANNEX CONSTRUCTION TO THE
    US POST OFFICE AND COURTHOUSE IN THE CITY  AND COUNTY OF
    CHARLESTON*  SOUTH  CAROLINA.  THE ANNEX  WILL CONTAIN 25,270
    SQ. FT. OF OCCUPIABLE  SPACE.   THE ALTERNATIVES CONSIDERl
    1) NO ACTION*  2) CONSTRUCTION OF ANNEX* 3)  RELOCATION OF
    POST OFFICE*  4) RELOCATION OF COURTHOUSE*  5) LEASING OF
    EXISTING  SPACE* 6)  ACQUISITION OF ADJACENT BUILDING, AND 7)
    USE OF EXISTING GOVERNMENT OWNED BUILDINGS.
    (ESC-eiOOl)
    (EI3 ORDER *  610020)

-------
                              -65-

              ZNTERSTATE COMMERCE COMMISSION

CONTACT!      MR. CARL BAU8CH, CHIEF
              SECTION OF ENERGY AND ENVIRONMENT
              INTERSTATE COMMERCE COMMISSION
              ROOM 3371
              12TH & CONSTITUTION AVE., N.W.
              WASHINGTON* D.C. 20423
              (202) 275-7656


FINAL                                                      DATE

    SOMERSET RAILROAD, CONSTRUCTION AND OPERATION          01/16

    NEN YORK
    COUNTYl        NIAGARA
    PROPOSED IS CONSTRUCTION OF A 9.9 MILE RAIL LINE BETWEEN
    GASPORT AND SOMERSET, IN NIAGARA COUNTY, NEW YORK.  THE LINE
    WOULD CONNECT WITH AN EXISTING RAIL LINE IN GASPORT AND
    SERVE AN EXISTING STEAM-ELECTRIC GENERATING FACILITY IN
    SOMERSET.  THE ALTERNATIVES CONSIDER VARIOUS MODES OF TRANS-
    PORTING COAL.  THE COOPERATING AGENCIES ARE, THE STATE OF
    NEW YORK, FW8, COE, FRA AND USCG.
    (FINANCE DOCKET NO. 29254)
    COMMENTS MADE BY I COE  EPA  DOI  DOC
                      STATE AND LOCAL AGENCIES
                      GROUPS,  INDIVIDUALS AND BUSINESSES
    (EIS ORDER * 810043)

-------
                                   -66-

                   NUCLEAR  REGULATORY  COMMISSION

     CONTACTl      MR.  DANIEL  R(  MULLER
                   ASSISTANT DIRECTOR  FOR
                      ENVIRONMENTAL TECHNOLOGY
                   NUCLEAR  REGULATORY  COMMISSION
                   ROOM P-202
                   WASHINGTON,  D.C.  20555
                   (301)  492-7017

     DRAFT                                                      DATE

         DECOMMISSIONING OF NUCLEAR  FACILITIES                  01/29

         THIS  GENERIC STATEMENT'PROPOSES A  REEVALUATION  OF  REGULATORY
         REQUIREMENTS CONCERNING THE DECOMMISSIONING  OF  COMMERCIAL
         NUCLEAR  FACILITIES.   CONSIDERED IS THE DECOMMISSIONING OF
         PRESSURIZED  MATER  REACTORS* BOILING MATER  REACTORS*  FUEL
         REPROCESSING PLANTS,  MIXED  OXIDE FUEL FABRICATION  PLANTS,
         URANIUM  HEXAFLOURIDE  CONVERSION PLANTS,  URANIUM SPENT FUEL
         FABRICATION  PLANTS*  INDEPENDENT SPENT FUEL STORAGE INSTALLA-
         TIONS, NUCLEAR ENERGY CENTERS, AND FACILITIES FOR  HANDLING
         NON-FUEL-CYCLE BYPRODUCT* SOURCE AND SPECIAL NUCLEAR
         MATERIALS.
         (NUREG-05B6)
         (Eis  ORDER * eiooeei


DRAFT SUPPLEMENT                                                 DATE

         SAN ONOFRE NUCLEAR GENERATING STATION  CDS-1)          01/16

         CALIFORNIA
         COUNTYl         SAN DIEGO
         THIS  STATEMENT SUPPLEMENTS  A  DRAFT EIS*  #781287, FILED
         11-30-78 CONCERNING  THE OPERATION  OF THE SAN ONOFRE NUCLEAR
         GENERATING STATION UNITS 2  AND 3  IN SAN  DIEGO  COUNTY*
         CALIFORNIA.   THE PURPOSE OF THIS  SUPPLEMENT  IS  TO EVALUATE
         THE SITE-SPECIFIC  IMPACTS ATTRIBUTABLE  TO PLANT-SPECIFIC
         ACCIDENT SEQUENCES  THAT LEAD TO RELEASES  OF RADITION AND/OR
         RADIOACTIVE  MATERIALS.
          CNUREG-0490)
          CEIS  ORDER * 810038)

-------
                 ANNUAL  SUMMARY OF 102  STATEMENTS  FILED THROUGH 1981
                                            -67-
                                     (By Agency)
                                  Draft EIS's filed
                                    Airing .
            Final EIS's
            filer*
               1901
 Agency
          Suppl.
          filed

            iff
      Total Actions
      on which Draft
      or Final State
      have been rec.
Agriculture, Department of
Appalachian Regional Commission
Architect of the Capitol
Canal Zone Government
Civil Aeronautics Board
Commerce, Department of
Consumer Product Safety Cotnm.
Defense, Department of
  Air Force
  Army
  U.S. Army Corps of Engineers
  tiavy
Delaware River Basin Cotnm.
Energy, Department of
Energy Policy Office
Energy Research & Devel. Admin.
Environmental Protection Agency
Federal Energy Administration
Federal Maritime Commission
Federal Energy Regulatory Cotnm.
Federal Trade Commission
General Services Administration
Great Lakeu Basin Commission
HEW, Department of
HUD, Department of
Interior, Department of
International Boundary and Water
   Comm.  — U.S. and Mexico
Interstate  Commerce Commission
Justice, Department of
Labor, Department of
Nat'l. Aeronautics & Space Admin.
Nat'l. Capitol  Planning Comm.
Nat'l.  Science  Foundation
Hew England River Basins  Comm.
Nuclear  Regulatory Commission
 Office of  Science Technology
 Ohio .River  Basin Commission
 Pacific  Northwest River Basins Comm.
 Pennsylvania  Ave. Devel.  Corporation
 Souris-Red-Rainy River Basins  Comm.
 State Department
 Tennessee Valley Authority
 Transportation, Department of
 Treasury,  Department  of
 Upper Mississippi River  Basin  Comm.
 U.S. Postal Service
 U.S. Water Resources Council
 Veterans Administration
 FEDERAL COMMUNICATIONS CCM-HSSICN
     TOTALS
                 2
                 2
5
4
5
8
                  1

                  1
                 17
                         3
                        41
                                          15
0
0
             0

             0
10
12
                                          23
                                          93

-------
                             -68-
          UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
*'««PBtf^                   WASHINGTON. D.C.  20460
                            102 MONITOR


    The 102 Monitor is a monthly publication of the Fnyiron-
    mental Protection Agency,  in addition to its listing of
    Environmental Impact Statements which have been filed under
    the provisions of the National Environmental Policy Act  (NEPA),
    the Monitor contains a list of EPA's comments, filed under the
    provisions of Section 309 of the Clean Air Act, as amended;
    items of current concern in NEPA case law; information on
    the environmental studies of the Council on Environmental
    Quality; and other matters of interest.

    The 102 Monitor is printed and distributed by the Government
    Printing Office.  The subscription rate for the Monitor  is
    $20.00 annually, with an additional $5.00 charge for foreign
    mailing; individual copies of the Monitor are $1.70 domestic
    and $2.15 foreign and are available from GPO.

                        Superintendent of Documents
                        Government Printing Office
                        Washington, D.C.  20402

    (Difficulties in obtaining copies of the 102 Monitor should
    be-referred to GPO's Service Section, P.O. Box SSOS,
    Washington, D.C.  20402.)


    Prices revised May, 1978

-------
                          CHANGE  OF ADDRESS  FORM
                                            NAME—FIRST. LAST
                         I  I I  I  I  I  I  I  I  I  I  I  I  I  I I  I  I I  I  I  I  I  I  I  I  I  I
                                  COMPANY NAME OR ADDITIONAL ADDRESS LINE
                         I  I  I I  I  I  I  I  I  I  I  I  I  III  I  I I  I  I  I  I  I  I  I  I  I  I
                                             STREET ADDRESS
                         I  I  I I  I  I  I  I  I  I  I  I  I  I  I  I  I  I  I I I  I  I  I  I  I  I  I
                                     CITY              I  .     I STATE!
                         I  I  I I  I  I  III  I  I  I  I  I  I  I  '     I  I   I
                  ZIP CODE
                  I  I  I  I
                       PLEASE PRINT OR TYPE
Mail this  form  to:  NEW ADDRESS

Superintendent  of Documents
Government Printing Office SSOM
Washington, D.C.   20402
(or) COUNTRY

I  I   I  I  I
 Attach last subscription
       label here.
                          SUBSCRIPTION  ORDER  FORM
  SUBSCRIPTION ORDER FORM

  ENTER MY SUBSCRIPTION TO:   102 MONITOR     (MNT)

  <§  $20.00 Domestic; @  $25.00 Foreign
NAME— FIRST,
1 1 1 1 1 J 1 1 1 1 1 1 1 1 1
COMPANY NAME OR ADDITIC
1 1 1 1 I 1 1 1 1 1 1 1 1 1 1
STREET ADD
1 1 1 I I 1 1 1 1 1 1 1 1 1 1
CITY
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
PLEASE PRINT OR TYPE (
LAST
1 1 1 1 1
>NAL ADDRESS L
1 1 1 1 1
HESS
1 1 1 1 1
STATE
1
INE
|
|

or) COUNTRY
II I 1 1
1 1 1 1
1 1 1 1
1 1 1 1
ZIP CODE
1 1 1 1
1 1
                                                                Remittance Enclosed (Make
                                                                checks payable to Superin-
                                                                tendent of Documents)

                                                                Charge   to   my  Deposit
                                                                Account No
                                                              MAIL ORDER FORM TO-
                                                              Superintendent of Documents
                                                              Government Printing Office
                                                              Washington. DC  20402
 •US GOVERNMENT PRINTING OFFICE  1981  341-084/101  1-3

-------