  LANDFILL GAS

  ENERGY UTILIZATION:

  TECHNOLOGY OPTIONS

  AND CASE STUDIES
 Prepared for
 Office of Air and Radiation
 and

 Office of Policy. Planning and Evaluation
Prepared by
Air and Energy Engineering Research
Laboratory
Research Triangle Park NC 27711

-------
                       EPA REVIEW NOTICE
This report has been reviewed by the U.S. Environmental Protection Agency, and
approved for publication. Approval does not signify that the contents necessarily
reflect the views and policy of the Agency, nor does mention of trade names or
commercial products constitute endorsement or recommendation for use.

This document is available to the public through the National Technical Informa-
tion Service, Springfield, Virginia 22161.

-------
                                 EPA- 600 /R- 92-116
                                 June 1992
    LANDFILL GAS ENERGY UTILIZATION:
TECHNOLOGY OPTIONS AND CASE STUDIES
              Don Augenstein
               John Pacey
            EMCON Associates
           San Jose, CA 95131
        EPA Contract No. 68-D1-0146
           Work Assignment 15
        (E.H. Pechan and Associates)


            EPA Project Officer:

            Susan A. Thomeloe
    Global Emissions and Control Division
Air and Energy Engineering Research Laboratory
      Research Triangle Park, NC 27711
               Prepared for

    U.S. Environmental Protection Agency
     Office of Research and Development
         Washington, D.C.  20460

-------
                                          FOREWORD
Landfill gas has been successfully used for energy at many locations in the U.S. and worldwide, providing
economic, environmental, and other benefits.  However, landfill gas energy uses are also relatively new,
and technologies are far from "cut and dried.'  There are limitations and special considerations with
landfill gas energy use; a number of landfill gas  energy projects have experienced problems, or even
failed entirely.  There is current need for documentation of experience and consolidation of information in
several areas regarding the use of landfill gas as a fuel.
This report reviews the various landfill gas energy uses, and their associated issues and constraints.  It
also presents case studies of six landfill gas energy projects in the U.S. The report's purposes include
      •  Presenting  overviews  of  use and  equipment  options,  and  technical and other
         considerations with landfill gas energy applications.
      •  Providing information on projects that illustrate common landfill gas energy uses.

      •  Providing an awareness of limitations  and potential  pitfalls  existing with landfill gas
         energy use.
In addition to providing background on energy uses, it is anticipated that the report will help identify ai &s
needing  attention, for entities such as researchers and equipment manufacturers. It is also hoped fiat
the report can provide information useful in identifying ways to facilitate the beneficial uses of landfill gas
by reducing nontechnical barriers.
The complexities of landfill gas energy uses are such that the discussions of many issues must be limited
to overviews.  Where detail is available elsewhere the report refers to available literature containing that
information. This is also true for the case studies; these attempt to provide information so that a typical
reader with some limited background will have a reasonable understanding of the operation, based on a
representative description of a particular energy application. This document is not intended to provide the
degree of detail needed to design and operate a landfill gas energy facility.
The case studies rely on information provided by many individual operators, equipment manufacturers,
and others such as engineering firms.  An effort has been made to verify statements and data as much as
possible.  In particular, all  sections of the report have been  reviewed by the providers of the original
information and others with appropriate expertise. Background information is cited from literature and
other sources considered reliable, and it has also been reviewed.
  PJG  G640101AAOW

-------
                                          ABSTRACT
Combustible, methane-containing gas from refuse decomposing in landfills, or landfill gas,* can be fuel
for a variety of energy applications. This report presents case studies of  projects in the United States
where it has been used for energy, it also presents overviews of some of the important issues regarding
landfill gas energy uses, including appropriate equipment, costs and benefits, environmental concerns,
and obstacles and problems of such energy uses.
With allowance for its properties, landfill gas can be used in much commercially available equipment that
normally uses more conventional fuels such as pipeline natural gas. This includes equipment for space
heating, boilers, process heat provision and electric power generation.  Landfill gas energy uses, already
significant, could increase based on estimates of the landfill gas that could be recovered, and providing
that other factors, particularly economic ones, are favorable. Such energy uses have environmental and
conservation benefits.
Factors to be considered in using landfill  gas for energy include contaminants, which can  corrode
equipment and cause other problems, and its tower energy content,  resulting in moderate equipment
derating.  Other issues that are of normal concern for landfill  gas, such as forecasting  its recoverable
quantity overtime,  and its efficient collection, also bear importantly on its use for energy.

The case  studies review landfill gas energy use at six sites in the  U.S.  The energy applications include
electric power generation by reciprocating internal combustion engines, electric power generation by gas
turbine, space heating, and  steam generation in a large industrial boiler.  Case  study applications are
considered to represent attractive candidate uses for implementation at additional U.S. landfill sites.  The
case studies present the relevant site features, background  regarding the development of the case study
project, equipment used, operating experience, economics,  and future plans at the sites.  Obstacles and
problems at the sites are discussed. The case study sites exhibit wide variation in features such as cost
and degree of operating difficulty experienced. Such variation is typical of landfill gas energy projects,
which tend to be site specific. Literature containing information on other relevant case studies, in both the
U.S. and other countries, is also referenced.

Important conclusions include

      •  Landfill gas can be a satisfactory fuel for a wide variety of applications. Such uses
        have environmental and conservation benefits.   Many types of energy equipment
        designed for "conventional" fuels can operate on landfill gas with  outputs reduced by
        about 5 to 20 percent.

      •  Allowances must be made for the unique properties of landfill gas and particularly its
        contaminants.  Pitfalls  possible in landfill  gas energy applications include equipment
        damage due to such gas contaminants, and shortages resulting from over-estimation
        of its availability.
     •  The degree of gas cleanup and the methods used vary widely; the necessary amount
        of cleanup and the optimum tradeoffs between  cleanup stringency and the frequency
        of maintenance steps (such as oil changes) are not well established.

     •  Cost-to-benefit ratios can vary widely; at some sites they are excellent, while  at others
        they are a major limiting factor. Economics are probably the most important factor
        limiting landfill gas energy uses. Economics currently tend to preclude smaller scale
        uses, uses where electric power sale prices are  tow, and uses at remote sites lacking
       convenient energy applications or outlets.  Much of the landfill gas generated today is
        not used for energy because of economics.
 PJG G640101A.AOW                          f»

-------
      • Energy equipment emission limits in some U.S. locations may also restrict landfill gas
        energy use, despite an environmental balance sheet that  generally appears to be
        positive.
This report identifies technical areas where energy uses are likely to benefit from improvements. Some of
these are alluded to above.  This report also comments briefly on incentive, barrier elimination, and other
approaches that may facilitate landfill gas use.  Finally, for present and future landfill gas users, further
detailed documentation of the problems experienced,  and the results of approaches  to them (both
successful and unsuccessful), would be very helpful.

This report was  submitted  by EMCON  Associates,  in fulfillment of subcontract 275-026-31-05 from
Radian Corporation, as well as subcontract 93.3 from E.H. Pechan and Associates, and performed under
the overall sponsorship and direction of the U.S. Environmental Protection Agency, Global  Emissions and
Control Division.  This report covers a period from  February 1991 to January 1992. and work was
completed as of February 1992.
PJG G640101A.AOW                         iv

-------
                                  CONTENTS
     FOREWORD	-.	'.	II
     ABSTRACT	J«
     ACKNOWLEDGEMENTS	Jll
     CONVERSIONS	XlV
     1. INTRODUCTION AND BACKGROUND	1
        1.1  Landfills and Landfill Gas: General	1
        1.2  Composition of Landfill Gas	2
        1.3  Estimating the Gas Recoverable for Energy Uses	3
        1.4  Gas Extraction Systems	3
        1.5  Environmental and Conservation Aspects of Landfill
            Gas Energy Use	 4
        1.6  Regulatory Issues	-	4
     2. USE OF LANDFILL GAS AS A FUEL—TECHNICAL ISSUES	5
        2.1  Gas Composition Analysis	5
        2.2  Corrosion Effects	5
        2.3  Participates and Their Effects	6
        2.4  Gas Cleanup	6
        2.5  Dilution and Other Performance Reduction Effects
            With Landfill Gas	7
        2.6  Load Factor  ("Use it or lose IT)	8
     3. ENERGY APPLICATIONS AND EQUIPMENT	9
        3.1  Current Applications and Equipment	9
            3.1.1   Space heating (and cooling)	8
            3.1.2  Process heating and cofiring applications.  .„.	10
            3.1.3  Boilerfuel	10
            3.1.4  Reciprocating internal combustion engines with
                  electric power generation	10
            3.15  Gasturbines	11
PJG G640101A.AOW

-------
                                      CONTENTS
              3.1.6  Steam-electric	,	12
              3.1.7  Purification to pipeline quality methane	12

          3.2  Potential Future Technologies	12
              3.2.1  Fuei cells	12
              3.2.2  Compressed gas vehicle fuels	13
              3.2.3  Synthetic liquid fuels and chemicals	13

       4.  COST AND REVENUE COMPONENTS	14

          4.1  Components of Cost and Income	14

          4.2  Cost Data: Examples	.15
              4.2.1  Hypothetical generating facility example:
                    Cost component ranges	15
              4.2.2  Reported electric facility capital costs:
                    GAA Yearbook	15

          4.3  Other Economic Issues	17
              4.3.1  Revenue requirement for electric power
                    generation	.17
              4.3.2  Initial cost estimating	17
              4.3.3  Economic impediments to energy applications	17
      5.  Case Studies	19

          5.1  Electric Power Generation and Space Heating Using
              Landfill Gas: Prince George's County. Maryland	19
              5.1.1   Introduction and general overview	19
             5.1.2  History of project implementation	19
             5.1.3  Landfill and landfill gas system	23
             5.1.4  Energy facility and equipment	23
             5.1.5   Environmental/emissions	27
             5.1.6   Operation and maintenance	27
             5.1.7   Economics	"3
             5.1 A   Discussion	29
             5.1.9   Calculation bases—energy use and financing	30

         5.2 Electricity Generation Using Cooper-Superior Engine
             at the Otay Landfill	'.	31
             5.2.1   Introduction and general overview	.31
             5.22   Otay landfill and landfill gas system	-. .31
            5.2.3   Gas preprocessing and energy plant equipment	33
PJG G640101A.AOW                         vi

-------
                                       CONTENTS
              5.2.4  Environmental/emissions	36
              5.2.5  Operation and maintenance	36
              5.2.6  Revenue and cost items	37
              5.2.7  Discussion	37

          5.3  Electric Power Generation Using Waukesha Engines at the Marina Landfill. . 38
              5.3.1  Introduction and general overview	.38
              5.3.2  History of project	40
              5.3:3  Landfill and landfill gas extraction system	41
              5.3.4  Gas preprocessing and energy plant equipment	43
              5.3.5  Environmental/emissions	46
              5.3.6  Economics	47
              5.3.7  Operation and maintenance	48
              5.3.8  Discussion	48

          5.4  Electric Power Generation Using Gas Turbines at Sycamore Canyon Landfill. 49
              5.4.1  Introduction and general overview	.49
              5.4.2  History of system implementation	51
              5.4.3  Landfill and landfill gas system	,	51
              5.4.4  Plant equipment: Gas preprocessing and energy	52
              5.4.5  Environmental	55
              5.4.6  Economics	55
              5.4.7  Operation and maintenance	56
              5.4.8  Discussion	56

         5.5  Landfill Gas Fueled Boiler Raleigh, North Carolina	57
              5.5.1  Introduction and general overview	57
              5.5.2  History of project implementation	57
              5.5.3  Landfill and landfill gas system	59
              5.5.4  Energy equipment: Blower station, pipeline
                    and boiler.	60
              5.5.5  Performance	61
              5.5.6  Emissions	.62
             5.5.7  Operation and maintenance	62
             5.5.8  Economics	63
             5.5.9  Discussion	63

         5.6  Electrical Power Generation Using Caterpillar Engines at
             the Central Landfill, Yoto County, California	63
             5.6.1   Introduction and general overview	.63
             5.62  History of project implementation	65
             5.6.3  Landfill and landfill gas extraction system	66
PJG G640101A.AOW                         vii

-------
                                     CONTENTS
             5.6.4  Gas preprocessing and energy conversion equipment	68
             5.6.5  Performance and availability issues	69
             5.6.6  Environmental/emissions	.71
             5.6.7  Operation and maintenance	71
             5.6.8  Economics	71
             5.6.9  Discussion	71

         5.7 Other Relevant Case Studies and Information	72

         5.8 Other Supplemental Literature	75

      6. REVIEW, COMMENTARY, AND CONCLUSIONS	76

         6.1 Conclusions	76

         6.2 Further Needs	.77

         6.3 Facilitating Landfill Gas Energy Use	77

      REFERENCES	.79

      Appendices
            Appendix A   Estimating Gas Availability for Energy Uses	A-1
            Appendix B   Gas Extraction Systems	B-1
            Appendix C   Comments on Environmental and Conservation
                        Aspects of Landfill Gas Energy Use	C-1
            Appendix D   Regulatory Issues with Landfill Gas Use	D-1
            Appendix E   Gas Composition Analysis	E-1
            Appendix F   Cost, Revenue, and Other Economic Components	 .F-1
            Appendix G   Site Plan, Otay Electrical Generation Facility	G-1
            Appendix H   Equipment Specif icattons, Otay Generation Facility	H-1
            Appendix I    PG&E Power Purchase Rates, Marina	1-1
            Appendix J   Cleaver-Brooks Boiler Specifications	J-1
            Appendix K   United Kingdom Case Studies	K-1
            Appendix L   The Economics of Landfill Gas Projects in the
                        United States	L-1
           Appendix M   Waste Management of North America, Inc.
                        Landfill Gas Recovery Projects	M-1
           Appendix N   I-95 Landfill Gas to Electricity Project Utilizing
                        Caterpillar 3516 Engines	N-1
PJG G640101A.AOW
viii

-------
                                  ILLUSTRATIONS
       Figure                                                                   Paoe
       1    Cost Per Kilowatt Versus Size	.18
       2    Waukesha Engine - Generator Sets at Brown Station Road Landfill........ 20
       3    Energy Facility at Brown Station Road: Simplified Block Diagram	24
       4    Cooper-Superior Engine: day Landfill	32
       5    Electric Power Facility at Otay Landfill: Simplified
           Block Diagram	34
       6    Marina Landfill Electrical Generating Facility: Trailers Housing
           Gensets	39
       7    Electric Power Facility at Marina Landfill: Simplified
           Block Diagram	44
       8    Sycamore Canyon Electric Generating Facility: Genset Building	50
       9    Gas Turbine/Electric Power Facility at Sycamore Canyon:
           Simplified Block  Diagram	54
       10   Cleaver-Brooks Boiler at Plant of Ajinomoto. U.S.A	.".58
       11   Electrical Generation Facility at Yolo County Central Landfill	64
       12   Electrical Power Generation at Yolo County Central Landfill:
           Simplified Block  Diagram	67
PJG G640101A.AOW                         be

-------
                                       TABLES
      Table                                                                   Paoe
      1    Comparison of Component Concentrations and Other
           Properties: Pipeline ("Natural") Gas and Landfill Gas	3
      2    Landfill Gas Energy Applications	9
      3    Cost and Revenue Range for 1 MW Electrical Energy Project	16
      4    General Features: Brown Station Road Energy Facility	21
      5    Landfill and Landfill Gas System:  Brown Station Road	22
      6    Major Equipment Items: Brown Station Road Energy Facility	25
      7    Engine Operating Conditions on Landfill Gas:
           Brown Station Road	27
      8    Economic Data:  Brown Station Road Landfill Gas
           Energy Facility	29
      9    Power Generation and Revenue Calculations:  Brown
           Station Road	30
      10   Electric Generating Facility at Otay Landfill	31
      11   Landfill and Landfill Gas System Characteristics:
           Otay Landfill	33
      12   Details of Landfill Gas Pre-Processing Equipment at
           Otay Landfill	35
      13   Results of Source Test on Cooper-Superior Engine at
           Otay Landfill	37
      14   Revenue and Other Economic Data: Otay Energy Facility	38
      15   Electric Generation at the Marina Landfill	40
      16   Landfill and Gas System Characteristics: Marina	42
      17   Details of Landfill Gas Pre-Processing and Engine-Generator
           at Marina Landfill	.45
      18   Summary Results:  Emissions Tests on Marina Engines	46
      19   Economic Data for Marina Landfill Electrical Generating
           Facility	48
      20   General Information: Sycamore Canyon Landfill Gas Energy
           Facility	51
      21    Sycamore Canyon Landfill and Gas System Characteristics	52
      22   Gas Pre-Processing and Energy Equipment at Sycamore Canyon	53
      23   Some Emissions Test Results at Sycamore Canyon	55
      24   Economic Data: Sycamore Canyon Generating Facility.	56
      25   Steam Boiler Fueled by Landfill Gas: Basic Features	59
      26   Landfill and Gas System Characteristics: Witters Grove	60
      27   Summary of Energy Equipment Characteristics	 61
      28    Economic Data for Landfill Gas Fueled Boiler	62
PJG G640101A.AOW

-------
       29   Basic Features:  Electricity Generation at Yolo	£6
       30   Landfill and Landfill Gas System: Yolo	68
       31   Gas Preprocessing and Energy Conversion at Yolo	69
       32   Economic Data:  Energy Facility at Yolo County Central
            Landfill	72
       33   SWANA Landfill Gas Facility Tour Sites	74
PJG G640101A.AOW                         xi

-------
                                  ACKNOWLEDGEMENTS
 Many individuals contributed substantially to the development of information in this report. Assistance to
 the project came from guidance during the site visits, information provided, peer review, and in other
 areas. The authors would like to acknowledge the following, with their contributions:

 At the U.S. Environmental Protection Agency, Air and Energy Engineering Research Laboratory,  Global
 Emissions and Control Division:  Susan Thometoe provided guidance and encouragement as well as
 technical input, throughout all phases of this project. Robert Borgwardt reviewed the draft report.

 At the Environmental Protection Agency, Office of Air Quality Planning and Standards:  Mark Najarian
 reviewed the draft report.
 At the Brown Station Road Facility: Fred Castillo of the Maguire group arranged the site visit, provided
 information and reviewed the draft report. Tom Bryda of Maguire, Sheila Lanier and Fred Berry of  Prince
 George's County, and Richard Ay and Wayne Brashears of Curtis Engine all provided information  during
 and after the facility visit. Dave Leonard of Potomac Electric Power Company provided rate information.
 At the day Landfill: Alex  Roqueta and Frank Wong of Pacific Energy provided information on the  landfill
 and energy facility.  Stan Zison and Ed Cadwell of Pacific Energy also provided background information
 before the site visit.

 At the Marina Landfill:  David  Myers guided the facility tour. David Myers, Rick Shedden, and Michael
 Coulias provided information  on  the  facility at various  times: the engine operation  information was
 provided by Michael Coulias. All are employees of the Monterey Regional Waste Management District.
 At the Sycamore Canyon Landfill:  Robert Anuskiewicz and Peter Truman of Solar Turbines provided
 information on the site. Peter Truman guided the facility tour.
 At the Raleigh, N.C. boiler facility:  Bill Rowland of Natural Power, Inc.. guided the tour and provided
 information on the facility.  Ron Hoover and Gary Faw of Ajinomoto USA provided information on the
 boiler; Ron Hoover also reviewed the draft report. Jim Levitt of Palmer Capital also provided review of the
 site visit report.

 At the Yob County Central Landfill:  Jim Hiatt of Yolo County. Marshall Carpenter of  EMCON, Marvin
 Yadon, on-site facility  operator, Richard Ontiveros and  David Marquez of Palmer Capital, and Ted
 Landers of Perennial Energy all provided information on the landfill and energy facility. Philip Ziminsky of
 Stowe Engineering reviewed the draft report

 Waukesha Engine Division of  Dresser Industries:  Greg Sorge and Walter Pontell provided information
 during report preparation.
 Caterpillar Corporation, Engine Application Division: Curtis Chadwick provided information early in the
 project, and comments on the report.
 Browning-Ferris Industries: Richard Echols reviewed the draft report.
 George Jansen, of Laidlaw Gas Recovery Systems, provided the text of appendix L The Economics of
Gas Recovery Systems in  the United States," a presentation made on February 27,1992. in Melbourne,
Australia.
  PJG  G640101A.AOW                         xii

-------
Waste Management of North America, Inc. (WMNA):  Chuck Anderson, Phil Gagnard and others provided
helpful comments.  In addition, for this report, WMNA prepared appendix M. which describes the design
and operational philosophy of their 25 current landfill gas energy projects.

California integrated Waste Management Board (CIWMB):  Francisco Guterres and Pat Bennett reviewed
the draft report. They also circulated the draft report for review to Heather Raitt of the California Energy
Commission, and Renaldo Crooks of the  California  Air Resources Board. Heather Raitt's comments,
forwarded through the CIWMB, are appreciated.
Cambrian Energy Systems: Robert Hatch and Tudor Williams commented on tax credit and other issues.

Mike Miller, of Wayne Energy Recovery, Inc., reviewed the draft report.

Bill Owen, of Michigan Degeneration Systems, provided the write-up on the  recent landfill gas energy
project, which began operations in January 1992 (see appendix N).

Pat Lawson of the Energy Technology Support Unit (ETSU) of the United Kingdom Department of Energy
reviewed the draft report and provided information on U.K. landfill gas energy projects.
John Benemann, consultant,  provided numerous helpful comments.

Frederick Rice, F.C. Rice &  Company, provided  many helpful comments and suggestions on the draft
report.
 PJG G640101A.AOW                        xiii

-------
                                  CONVERSIONS
Readers more familiar with metric units may use the following to convert to that system.
Nonmetric
acre
Btu
ft
ft2
ft3
gal.
hp
in.
in. H2O (head)
in. Hg
Ib. mass
inch
mile
psi
U.S. ton
Temperature
Times
0.4047
252
0.3048
0.0929
28.32
3.785
0.748
2.54
248.9
3386
0.4536
2.54
1.609
6895
0.907

Yields Metric
hectares
Calories
meters
square meters
liters
liters
kilowatt
centimeters
Pascal
Pascal
kilogram
centimeter
kilometer
Pascal
metric ton

      Degrees Celsius - 0.556 (Degrees Fahrenheit - 32)
      Degrees Fahrenheit -1.8 (Degrees Celsius) * 32
PJG G640101A.AOW
xiv

-------
                             1. INTRODUCTION AND BACKGROUND
 This reports primary purpose is to provide information  on landfill gas energy uses.   The  report is
 addressed to a range of readers, presumed to include not only those familiar with landfills, landfill gas
 energy, and related issues, but also some who may have relatively little familiarity with these areas.

 A major report focus is case studies that document experience at representative U.S. sites where landfill
 gas has been used for energy. To accommodate needs of the expected range of readers, the report also
 presents background that should be useful to those developing knowledge of landfill gas energy uses,
 and helpful for understanding of the case studies.  Thus, the first section of this report provides general
 background relating to landfills and landfill gas energy uses. This is followed in the second section by a
 discussion of technical issues associated with landfill gas as a fuel—including the specific characteristics
 of landfill gas as a fuel,  and particular needs occurring with its use.  The third and fourth sections of the
 report cover equipment issues and economics. These are followed by case studies and conclusions.  It is
 hoped that this accommodates the needs of the anticipated range of readers.

 The following  section provides background primarily for the  benefit of those who  may have limited
 familiarity with solid  waste landfills,  landfill gas,  and landfill gas energy topics.  Some  of the basics
 pertinent to the use of landfill gas as a fuel include
       •  what landfill  gas is, and its origin
       •  its composition

       •  forecasting the quantity recoverable for fuel uses over time
       •  methodologies for its recovery

       •  environmental issues with landfill gas extraction and energy use

       •  regulatory demands and constraints regarding its use
 These are covered below to provide a context for further discussion of energy applications in  later
 sections.  Summary discussions of certain topics  are  supported with more detailed  information in
 appendices.

 1.1  Landfills and Landfill Gas:  General

 Sanitary landfilling  is the main method for disposal of municipal and household solid waste or refuse
 (•garbage") in the United States.  With current practice at landfills (no longer called 'dumps*), wastes
 received are spread, compacted, and covered daily with a soil cover to reduce blowing litter, manage bird
 and  rodent activity, and control odors. The process continues over a given area until a planned waste
 depth is reached; wastes are then covered with a final cover that has a relatively impermeable component
 (often clay) to limit surface-water infiltration.  Sanitary landfilling increased sharply in the U.S. in the early
 1970s as open dumping and incineration were restricted.  An estimated 145 million tons'  of wastes are
 currently landfilled annually in the  U.S. (Kakjjian. 1990).

 Most early practitioners of sanitary landfilling apparently trusted that waste decomposition would be of
 minor consequence.  However, even maintenance of an oxygen-free and relatively dry landfilled waste
   For readers more familiar with metric units, conversion factors are provided at the end of the front matter.
PJG G640101A.AOW

-------
  environment still permits certain biological reactions; these produce "landfill gas," and its generation can
  be significant.

  Landfill gas consists principally of a mix of two gases:  methane (chemical formula CH4) and carbon
  dioxide (chemical formula CO2).  It is generated through bacterial decomposition of organic refuse in the
  absence  of oxygen (anaerobic fermentation) (Geyer, 1972; EMCON, 1982, Gas Research Institute,
  1982).  It is produced by nearly all landfills in which refuse is buried such that oxygen is  effectively
  excluded. Although many reaction steps and intermediates can be involved, the basic biochemical
  reaction is exemplified  by the decomposition  of cellulose (the principal component of paper, and a
  constituent of much other refuse material):
                      n(C6H10O5)  +  nH2O	>3nCH4   +   3nCO2
                       cellulose     water    (bacteria)   methane    carbon dioxide

  Though this reaction scheme is simplified, It represents the overall process fairly well; most landfill gas is
  produced from decomposing cellulose, and most cellulose that decomposes yields methane and carbon
  dioxide.

  Because of its methane gas component (the same methane that makes up "natural* or pipeline gas),
  landfill gas is a fuel. With proper allowances for its properties, landfill gas can be used for fuel in many
  applications where other fuels, particularly natural gas, are used.  These fuel uses of landfill  gas are the
  major focus of this report.

  Landfill gas can  be a significant energy resource.  It is currently used at  more than 100 U.S. sites
  (Government Advisory Associates, 1991):  its use is continuing to expand.  Estimates of the ultimate
  energy potential of U.S. landfill gas vary, but information in various references (U.S. EPA, 1991; American
  Gas Association, 1980) suggest recoverable  energy potentials  ranging between 0.2 percent to over
  1 percent of the total of U.S. energy use. Though the expressed percentage of U.S. energy use might
  appear modest, the quantities are significant, given the total amount of energy the U.S. uses.

  1.2 Composition of Landfill Gas

 Characteristic  composition ranges  for landfill  gas are shown in table 1.  These  are typical for  "as
 extracted" gas as tt  is recovered. Also shown for comparison are the properties of "natural" or pipeline
 gas. As seen in table 1, landfill gas consists primarily of methane and carbon dioxide, usually in ctose-to-
 equal amounts. In contrast to pipeline gas, landfill gas also contains significant amounts of water vapor
 and traces of various organic compounds. Almost all of the organic compounds found in the gas (usually
 referred to as non-methane organic compounds [NMOCs] or sometimes reactive organic gases (ROGsJ)
 originate through evaporation into the gas of the man-made solvents, propellants, and similar materials
 discarded in the refuse stream; paint solvent vapors are one of many possible  examples in this category.
 Further discussion of these  landfill gas components is presented elsewhere (Gas  Research Institute,
 1982; Emerson and  Baker, 1991).  Landfill gas as extracted can contain nitrogen and, less frequently,
 oxygen from air entrained as  a consequence of extraction; the concentrations of these gases depend on
 the extraction objective and  approach (Augenstein and Pacey, 1991).  Landfills also contain a large
 amount of  soil and other paniculate material,  and the extracted gas can pick up  and carry with tt  a
 significant amount of that paniculate material.

 The landfill gas components  other than methane have effects that are often substantial  on its energy
 uses.  Carbon dioxide, nitrogen, and (to a slight extent) water vapor can result in dilution and other effects
 that moderately reduce energy equipment capacity.   The trace  organic components  (particularly the
 halogenated hydrocarbons) and particulates can cause serious energy equipment problems, including
corrosion and accelerated wear. These effects are discussed in more detail in the next section.
PJG G640101A.AOW

-------
     TABLE 1.  COMPARISON OF COMPONENT CONCENTRATIONS AND OTHER PROPERTIES:

                        PIPELINE ("NATURAL") GAS AND LANDFILL GAS
Component
Methane, CH4, percent
Ethane + Propane, percent
Water vapor, percent
CO2, percent
Nitrogen, other inerts, percent
Trace condensible hydrocarbons
(NMOC's; ppmv as hexane)
Chlorine in organic compounds
(micrograms per liter)
Hydrogen sulfide
(parts per million)
Higher Heating Value, Btu/ft3
Pipeline Gas
90-99
1-5
<0.01
0-5
0-2 (typical)
•0-
•0-
upto15
950-1050
Landfill Gas
(as extracted)
40-55
-0-
1-10 (typicaO
35-50
0-20
250-3,000 (typical)
30-300
to 200
400-550
 Information from sources including references (Gas Engineers Handbook, 1965; EMCON, 1982).  Units
 are those most commonly used for the stated component.
 1.3 Estimating the Gas Recoverable for Energy Uses

 Energy users have a critical need to know the gas quantity potentially recoverable over time from a landfill
 for energy use. The approaches that can be used to estimate this include modeling and field extraction
 tests. This topic is important because misestimates of gas availability are among the common causes of
 problems with  energy applications.  For readers interested in forecasting gas availability for end uses,
 further discussion is presented in appendix A.

 1.4 Gas Extraction Systems

 The landfill gas extraction system collects gas generated by the landfilled refuse, and delivers it to the
 energy application. The overall concern of the gas energy user is that the system will continue to provide
 a reliable supply of gas in the necessary quantity. Collection efficiency may also be a concern; it depends
 on design and operational factors and may range between 50 and 95 percent.  Further discussion of gas
 collection is presented in appendix B.
 The topics  of gas recovery systems, and extraction practice are important because difficulties with
collection systems  are also among the common causes of problems with energy facilities.
PJG G640101A.AOW

-------
  1.5 Environmental and Conservation Aspects of Landfill Gas Energy Use

  The energy uses of landfill gas have significant environmental consequences that are considered to be
  predominantly beneficial.  The gas extraction process helps abate both gas migration hazards and the
  emission of reactive organic gases that  contribute to air pollution.  A particular current concern is the
  contribution of landfill  methane emissions to  atmospheric  methane buildup, "radiative  forcing," and
  resulting climatic effects ("greenhouse effect").  Extraction and use mitigates these.  The energy use of
  landfill methane also "offsets* fossil  fuel use elsewhere, and reduces secondary pollution and the
  consequences of carbon dioxide emission that could otherwise be produced by use of that fossil fuel.  Its
  energy use also comprises  conservation.  These issues are  discussed elsewhere (U.S. EPA, 1991,
  Thometoe and Peer, 1991; Augenstein,  1990); a further description of these issues with  references to
  relevant literature is presented in appendix C.

  1.6 Regulatory Issues

  Those who become involved  with using landfill gas for energy will generally be affected by many
  regulations that pertain to landfill gas energy use. Among the most important of these are

       •  Proposed federal regulations associated with the recently amended Clean Air Act.
         These propose limits  above which NMOC/ROG emissions must be controlled, and
         specify the required degree of abatement. As one consequence of these regulations,
         most larger landfills now without energy systems,  but which would be  capable of
         supporting them, will probably be required to install gas extraction systems.
       •  Regulations applicable to landfill gas management, which vary locally across the U.S.,
         and that define the performance of gas systems based on factors such as prevention
         of off-site migration and reduction of atmospheric NMOC/ROG emissions.

       •  Regulations associated with the Public Utility Regulatory Policy Act  (PURPA).  These
         facilitate the sale of electric power produced from landfill gas to utility grids.

       •  Federal tax credit incentives that significantly improve the economics of the gas
         recovery process and of energy uses.

       •  State regulations that provide incentives to energy production.

       •  Emission restrictions that apply to energy equipment.

 An overview of regulations, regulatory issues,  and their consequences is presented in more detail  in
 appendix 0.
PJG G640101A.AOW

-------
                   2. USE OF LANDFILL GAS AS A FUEL—TECHNICAL ISSUES
 This section describes the technical issues regarding use of landfill gas as a fuel.  Noted as background is
 that a very large body of information on energy and equipment fundamentals is available from a variety of
 sources, such as standard texts, and equipment manufacturers.  As such information is widely available
 elsewhere, discussion of such standard energy technology aspects will be limited below.  This and later
 sections concentrate on the unique aspects of landfill gas, compared to conventional fuels, for which
 different approaches are needed and from which performance differences, surprises, and problems, may
 arise.   These  aspects would normally  be of greatest concern to energy users.  Discussion  also
 concentrates  more on  applications (detailed further in section 3)  that  appear the greater near-term
 opportunities.   Thus electrical and boiler use issues are emphasized  over, for example, those  with
 pipeline gas preparation.

 Some major issues that must be recognized and dealt with in energy use are

       • determining the composition and characteristics of the gas
       • potential corrosion effects caused by gas components
       • effects of particuiates
       • gas cleanup
       • dilution and other performance reduction effects
       • toad factor

 These  are addressed briefly below.  In addressing these issues it is assumed that readers have  at least
 some understanding of energy technology.

 2.1  Gas Composition Analysis

 In contrast to the case with more "conventional" fuels, users of landfill gas for energy may need to check
 their fuel composition fairly regularly. Landfill gas composition and energy content can  change because
 of extraction procedures, leaks, or other factors. Gas systems often need to be "tuned" to provide a gas
 stream of appropriate quality to keep energy equipment running, and this tuning can require frequent well-
 by-well analysis. The gas will also contain a range of contaminants, whose level varies by landfill and
 over time.   Since  gas composition can have  important energy consequences, composition analysis is
 reviewed briefly  in appendix E.

 2.2 Corrosion Effects

 Serious equipment corrosion can be associated with landfill gas energy use. Corrosion is generally due
 to hydrogen chloride and fluoride resulting from combustion of halocarbons (chlorine- and fluorine-
 containing or hatogenated, organic compounds) that are present in the gas. These  compounds  include,
 for example, the  chlorofluorocarbons (CFCs) that were widely used in the past as refrigerants and aerosol
 propellants. Though CFCs are now being phased out because  of  environmental effects, they  are still
 found in landfill gas (as old aerosol containers in the landfills release their contents over time). Other
 chlorinated compounds (such as industrial degreasing and dry cleaning solvents) also find their way into
 landfills and then into the gas.
Though levels of hydrogen chloride in combustion product gases are  tow, the hydrogen chloride is readily
reactive with, for example,  the metal in reciprocating internal combustion (1C) engines.  Damage can
result when metal in 1C engine cylinder walls and other engine parts (including exhaust valves) reacts and
PJG G640101A.AOW

-------
  is removed.  Hydrogen chloride and fluoride can also react with metal in other equipment such as the
  tubes of boilers.  Secondary damage can result  from the  buildup of solid corrosion products on the
  surfaces of moving engine parts.  For example, deposits can reduce piston/cylinder or other lubricated
  surface clearances to zero, at which point the engine seizes and will be severely damaged. Case studies
  presented later in this report document such damage.
  One engine  manufacturer reports, based  on many tests, that the content of chlorine  in landfill gas,
  chemically bound in volatile compounds, is typically between 60 and 200 micrograms per liter of gas1.
  Because of corrosion effects, all engine manufacturers recommend that landfill gas be analyzed for its
  content of chlorine in chlorinated compounds (Chadwtek, 1989).  Various operating modifications (to be
  discussed later) are also recommended to prevent engine wear. The measures taken are generally, but
  not uniformly or completely, successful in limiting corrosion effects.

  The gas can also contain other potentially troublesome chemical contaminants; for example acetic and
  other organic acids in the landfill gas condensate can  react  with steel.  Problems from this source are,
  however, relatively minor.

  2.3  Particulates and Their Effects

  Experience has shown that paniculate  contaminants entering with the gas can build up in the oil used  in
  many landfill gas engines, accumulating until they present problems.   Paniculate contaminants are of
  various types, including silica (a common soil component), iron salts (where steel is used in collection
  systems), and other normal soil components.  (One interesting source of paniculate contaminants in oil is
  a gaseous silicon compound, dimethyl  siloxane, which will combust to products including silica.   It is not
  removable by normal gas cleaning methods.)

  Discussion of these compounds, and their  effects on 1C engines, are presented in references including
  Vaglia, 1989,  Buildup of these components in oil above certain levels can contribute to wear.  The
  materials can damage cylinder linings and  rings; heavy deposits can also form on combustion chamber
  surfaces.  The  potential deleterious effects of paniculate contaminants, as well as gaseous and liquid
  contaminants discussed earlier, make gas cleanup extremely important, as discussed next.

  2.4 Gas Cleanup

  Users of landfill gas for energy have often practiced what could be considered relatively limited cleanup
 (this excepts pipeline gas preparation,  discussed later).   Limited  cleanup  has  provided satisfactory
 operating results at may sites  including one case study site of this report.  In other cases, however, the
 application of more apparently thorough cleanup, which for landfill gas can be considered 'state-of-the-
 art,' has not prevented frozen' engines, or corroded equipment, and similar mishaps.

 The primary "generic* cleanup  approaches are filtration and condensate knockout. These are sometimes
 augmented by refrigeration, and less often by desiccation and other approaches.

 Landfill gas filtration can employ the same type of equipment as used (for example) in large-volume air
 cleaning for internal combustion engines and combustion gas turbines. Filters may include simple particle
 size  cutoff  or coalescing models.   Some  description  of  these  is  included in the  case  studies.
 Refrigeration, to remove gas steam contaminants by condensation, is now practiced at a number of sites.
 Typically the gas stream may exit a landfill wellhead at a temperature  exceeding 100*F, saturated with
 water vapor; cool (with condensate removal) to near ambient temperature on its way to the energy facility;
 and then be refrigerated further, for contaminant removal to a dew point (typically) of 1*C or about 34'F.
 This  cooling  will typically  remove between 80 to 95 percent of the  water and a  fraction of other
   Personal communication, Greg Serge. WauKesha Engine Division of Dresser Industries. WauKesha. Wisconsin, June 1991.
PJG G640101A.AOW

-------
 condensible  contaminants  (which  is a  function  of the  specific contaminant's vapor pressure,
 concentration, and other factors).
 Where refrigeration is practiced, icing and high parasitic energy consumption normally limit gas cooling for
 cleanup purposes to a lower temperature slightly above the freezing point of water. The problem with this
 limit  is that gas compounds  that may  cause corrosion problems, in particular the  lower-boiling
 halogenated compounds that are a major part of the threat to equipment are not removed.   Where
 prevention of condensate (ice or liquid) in the treated gas is a must—for example where compressed
 landfill gas is to be pipelined in cold climates—chemical desiccation may be applied to reduce dew points
 to well below the freezing point of water.

 Approaches to more completely remove contaminants from landfill gas (but that still leave  C02 in) have
 been applied; on a commercial scale, the  Olinda site (Vaglia; 1989, GRCDA, 1986) uses  the Selexol®
 process to remove  contaminants.  Other approaches, including absorption  of gas components on
 activated carbon, have been demonstrated but only on a pilot scale (Watson, 1990).

 As a summary observation, the cost-effective cleanup  methods to date (except those for purification of
 gas to pipeline  standards)  all leave some  fraction  of  contaminants,  and particularly halocarbon
 components, in the gas.  These contaminants are difficult to remove because of their low boiling points,
 concentrations, poor affinity for traditional  solvents or a combination of these factors.  The economic
 tradeoffs between more complete removal  of various contaminants, and simply  dealing with their effects
 when the gas is used for energy (by such means as more frequent engine oil changes) and other engine
 design and operational modifications, are not completely evaluated. The correlation between degrees of
 cleanup, observed levels of energy equipment corrosion, and performance needs further analysis.
 These observations about cleanup pertain to most energy applications, except purification  to pipeline
 quality gas, where far more thorough cleanup is applied  to remove nearly all compounds  except the
 methane component from the gas. Pipeline gas cleanup will be discussed further below.

 2.5  Dilution and Other Performance Reduction Effects With Landfill Gas

 Because landfill gas contains inert components—close to half carbon dioxide,  and smaller amounts of
 nitrogen .and water vapor—{he performance of energy equipment is typically reduced compared to its
 performance with more "conventional" fuels such as pipeline gas.  The equipment rating  does not (as
 might  first  be thought) decrease proportionally to the gas energy-content reduction  (i. e.,  the rating of
 equipment on 500 Btu per cubic foot [Btu/ft3] landfill gas does not decrease to half the rating  of equipment
 on 1,000 Btu/ft3 pipeline gas). The fractional loss of rating (derating) instead depends in a  complex way
 on fuel-air  mix  heating value and the  combustion characteristics of  the landfill gas used in the energy
 application. For naturally aspirated 1C engines, the dilution effect of C02 at equal input flow rates o1 fuel-
 air mix can reduce the energy content of the gas in the cylinder's combustion chamber by  about 8 to
 10 percent, which will  reduce  the power output by this  amount  based  on  energy throughput
 considerations alone.  The inert components can also have slight secondary effects in reducing  flame-
 front velocity and combustion temperature,  which reduce efficiency by a slight additional amount, so that
 the engine  rating is reduced, overall, by 10 to 12 percent.
 For energy equipment that bums pressurized nonstoichiometric fuel mixes, such as lean-bum 1C engines
 and  gas turbines, energy efficiency losses  occur from another  source:  landfill gas  at atmospheric
 pressure requires compression work that is a parasitic toad. This is in comparison to pipeline gas, which
 is typically available at the required pressures. This tends to reduce efficiency (which can vary somewhat
 independently of output) by 5 to 15 percent for lean-bum engines on landfill gas.

 In boilers and process and space heating applications where landfill gas is used in burners, heat output
 reduction at constant total fuel-air volumetric throughput is about  12 percent.  About 10 percent of the
reduction is because of inert gas dilution, with the remaining 2 percent because of increased stack heat
losses. Refrigeratton, if practiced for cleanup, can reduce efficiency by (very roughly) another 5 percent.
PJG G640101A.AOW

-------
  Overall,  landfill gas  energy users should be prepared for energy equipment rating  tosses that range
  between 5 and 20 percent, depending on the application.

  2.6  Load Factor ("Use H or lose HN)

  One consideration regarding landfill gas is that there is currently no well-established way of storing it  It
  must be used essentially as it is generated, or it is tost.  This means that it is most suitable for energy
  applications that  are constant and continuous such as electric power generation, pipeline use  (with
  purification),   or continuous or near-continuous plant process use.  Intermittent uses such as space
  heating can be practical, but are more efficient if combined with other energy applications, such as
  absorption cooling, that can assure higher year-round gas  use.   Some of the difficulty can  also be
  overcome by using landfill gas to supply that part of the energy demand that is continuous, and other
  fuels to meet that part that may be variable.
PJG G640101A.AOW

-------
                         3. ENERGY APPLICATIONS AND EQUIPMENT
 Table 2 presents some of the more common and important current landfill gas energy applications and
 potential future applications.  Considerations regarding their use are presented in the text.  A brief
 discussion of applications, in order of increasing complexity, is presented next.

 3.1  Current Applications and Equipment

 3.1.1  Space heating (and cooling)
 Normal gas-fired  space heating  equipment in widespread use can, with moderate burner and other
 modifications, use landfill gas.  Such use has been limited to date because appropriately sized users of
 space heat  are only infrequently located near  landfills, and piping costs to  more distant users can be
 prohibitive.  Depending on climate and other factors, heat energy supplied by 500,000 cubic feet per day
 (cfd) landfill gas could correspond to heating needs of a 200,000- to 1,000,000-square-foot (or several
 acres of floor space) complex, large by normal standards.  Space heating loads also vary undesirably
 over time, both during the day and by season; a higher overall load factor for the gas use can, however,
 be obtained by combining absorption chilling with space heating in temperate climate zones.  Condensate
                       TABLE 2.  LANDFILL GAS ENERGY APPLICATIONS

 Current Applications1                      Degree of Use2
 Space Heating (and cooling)                  Limited

 Industrial Process Heat                      Limited

 Boiler fuel                                  Moderate

 Electrical Generation: 1C engines              Most common

 Electrical Generation: Gas turbines            Common

 Electrical Generation: Steam Turbine          Limited

 Purification for pipeline use                   Moderate


 Potential Future Applications

 Electric generation using fuel cells

Compressed methane vehicle fuel

Synfuel or chemical feedstock
1.   Most significant actual or potential uses.
2.   Statistics on use (such as in Government Advisory Associates, 1991) have included most, but not all,
    facilities. In defining degree of use in terms of the fraction of the total landfill gas recovered and used
    for energy in the U.S., limited- is about 5 percent, 'moderate' te 5 to 20 percent, 'common- is 20 or
    more percent, and 'most common' is about 50 percent. A recent, more comprehensive update on
    use has been presented (Thometoe, 1992).
PJG G640101A.AOW                           9

-------
 in equipment can be troublesome in space heating applications and poses a corrosion potential; gas
 cleanup and construction materials are important. Despite these limitations space heating can work well;
 one of the case study sites uses  it.  The equipment is also economical and available even on a small
 scale.

 3.1.2   Process heating and coflrlng applications
 Several industrial applications, such as lumber drying, kiln operations, and cement manufacturing, can be
 attractive  applications for landfill  gas.  An advantage of many industrial processes, including drying
 processes, is that fuel  is required continuously, 24 hours a day.  Landfill gas can be also used  as a
 supplemental fuel that meets a portion of the total demand.  Many industrial processes such as cement
 manufacturing may be relatively insensitive to  the contaminant components resulting from landfill gas
 combustion, and their gas cleanup costs may be quite low in such applications.
 One application that can be attractive because of absence of gas cleanup needs, and frequently plant
 proximity, is co-firing of the gas as  supplemental fuel in a waste-to-energy plant.

 3.1.3   Boiler fuel

 This is an attractive use, particularly tor large industrial boilers with constant demand, or where landfill gas
 can be used as a  supplemental fuel.  Conventional equipment can use landfill gas with relatively little
 modification.  One case study of this report, in section 5, describes a boiler application. To the extent that
 sensitivity to gas contaminants can be determined, boilers may be less sensitive  and their gas cleanup
 needs  less than, for example. 1C engine applications. The capital costs of boilers, discussed later, are
 also attractive.  Although steam users are not frequently located near landfills, the siting of boilers, or for
 that matter other uses of 3.1.2, near landfills can be an alternative worth consideration.

 3.1.4   Reciprocating Internal combustion engines with electric power generation

 Reciprocating internal combustion engines, almost all driving electrical generators to produce electrical
 power, are the most widely used  landfill  gas fueled energy equipment.   Electrical generation occurs
 because the output can be accepted (if not always at a high price) by the electric utility grid 24 hours a
 day, and the power sale may be facilitated by provisions of PURPA.  Although available statistics are far
 from complete,  data in the 1991 GAA yearbook (Government Advisory Associates, 1991) suggest that
 electrical generation using reciprocating internal combustion engines is practiced at about 50 percent of
 the landfill gas energy sites in the  U.S., and electrical generation using gas turbines is practiced at an
 additional (approximately) 15 percent, so that electrical generation is practiced at about 65 percent of the
 total sites.

 Almost all larger engines used in this application are made by three manufacturers—Caterpillar, Cooper-
 Superior, and Waukesha. Each has in place more than 20 engines at landfill sites in the U.S. Lists of the
 sites where the various models of the three  manufacturers' engines are in place are presented  in
 GRCDA/SWANA, 1989.

 The engine-generator set (genset)  equipment is well developed and is used not only with  landfill gas but
 for numerous other applications; the landfill gas  sets sold by the three manufacturers are largely identical
 to those of the complete 'stand alone" package sets sold for use at remote sites such as offshore  oil
 platforms and other remote sites requiring electric power.  Currently increasing degrees of automated
 engine monitoring and control reduce the need  for on-site operator attention.  Genset electrical capacity
 with landfill gas is typically 100 kW and up, with  capacities between 1  to 10 megawatts (MW) being most
 common because of economics.  Multiple gensets are used to obtain the higher outputs.
 The reciprocating engines are most commonly "lean bum" turbocharged designs that  bum fuel  with
 excess air. Less commonly, they may be "naturally aspirated" without turbocharging (which as the term is
used also implies stoichiometrically carbureted, with air in the fuel-air mix just sufficient to bum the fuel).
The naturally aspirated  engines are easier to operate because  they are less complex,  but they have
PJG G640101A.AOW                           10

-------
reduced power output and unresolved emissions issues. When operated on landfill gas, reciprocating
engine power ratings are commonly reduced by 5 to 15 percent compared to operation on natural gas.
This derating is caused by different factors,  depending on  engine type: dilution effects in naturally
aspirated engines and parasitic load in lean-bum engines. The overall heat rate for electrical generation
with the more commonly used lean-bum engines (after all parasitic toads are deducted), is about 11.000
to 14,000 Btus of landfill gas higher heating value per kilowatt hour. For smaller scale electric generation,
this efficiency is quite good; this is one reason these engines are popular.
Landfill-gas-fueled generation comprises a rather small portion of the total use of such engines.  Despite
this, the three manufacturers of these engines have modified both design and operating procedures so
that they can be said to have "landfill-gas-adapted" engines.   With turbocharged engines, the  need to
compress landfill gas initially at ctose-to-atmospheric pressure normally poses added capital and energy
costs compared to pipeline gas fueling. Compression of the fuel-air mix post-carburetion avoids some of
these costs and (along with other landfill-gas-specific adaptations) is now being applied by Caterpillar in
their 3516 series engines (Chadwick, 1990).  Various design modifications, by all manufacturers, include
parts modifications for corrosion resistance, such as chrome valve stems and modified piston rings; pro-
prietary  modifications are frequently involved2.  One of the  important operating modifications relates to
engine oil as recommended by the engine makers (Chadwick.1989). Oil is checked  much more often
than is usual in other applications, sometimes as often as every 50 hours. Oil is changed frequently, as
often as every few hundred hours or when relatively low contaminant  limits for chloride (chloride can
indicate  corrosion as discussed earlier) or metal content are observed, according to manufacturer's guide-
lines. Specialized lubricating oils with high total base numbers (TBN; for discussion see Gonzalez, 1987)
are now recommended for landfill gas use. Chemically, the bases in these oils give the acidic combustion
products something to react with before they react with the metal of the engine. These can be thought of
as helping engines the same way that antacids help people (and by neutralizing the same acid).
With the design and operating modifications that have been  made for  landfill gas engines they can
generally be operated successfully at landfills.  Yet, for reasons that  are still not completely understood.
(but that may relate to presence or absence of various landfill gas operational and design adaptations)
some engines at some landfills encounter serious operating problems.  They are most frequent during
initial operation..

3.1.5  Gas turbines
Combustion  gas turbines are  also widely used as landfill-gas-fueled  prime movers  (i.e., sources of
mechanical power) at landfills to drive generators.  The justifications for their use  in  electric power
generation are the same as those for reciprocating internal combustion engines.

The gas turbines used at nearly all U.S.  landfill sites are either Saturn or Centaur models made by the
Solar turbine division  of Caterpillar.  As of 1989, more than 30 Saturn or Centaur turbines were in use at
more than 20 landfills: lists of their applications are presented in Esbeck, 1989, and Maxwell, 1989.

The principal power-rating consequence  of using,landfill gas as opposed  to pipeline  natural gas in
turbines  is a decrease of 10 to 15 percent in the power rating, due to the parasitic toad associated with
compression of the landfill gas fuel to the turbine.   When all factors are considered, a turbine has a
somewhat tower net efficiency in typical landfill gas applications than a reciprocating internal combustion
engine.   The heat rate of smaller turbines is typically about  16,000 Btus landfill gas higher heating value
per kilowatt hour generated when parasitics are accounted for.
A factor to be considered in turbine operation is that turndown performance is poor-^hat is, turbines do
best at  full load, and poorly  if gas supplies are less than  needed to supply full toad operation.  Gas
contaminants  have also apparently caused serious  problems for some landfill-gas-fueled gas turbines.
These  have  included  combustion chamber erosion and deposits on blades, resulting  in severe  and
2  Personal communication. Curtis Chriwick, CaMrpiRar Corporation. MossviHa. Illinois. September 1991.
PJG G640101A.AOW                           11

-------
 unanticipated damage in a tew cases. A well-documented instance of turbine damage and associated
 cost is presented in Schtotthauer, 1991. The use of improved coalescing type filters (in combination with
 other  modifications) has apparently solved or forestalled problems at sites described in Schtotthauer,
 1991. One danger of severe damage to turbines that does not exist with conventional fuels is that a large
 "slug" of landfill gas condensate  in the piping system could  mobilize  and reach the turbine  (it is  a
 consideration with 1C engines as well). Methods for intercepting such slugs are required when this danger
 exists at turbine sites.
 Although problems are seen at  some turbine sites, they appear to have solutions. Turbines have the
 advantages of tow operator attention and maintenance needs.

 3.1.6  Steam-electric
 Steam-electric generation bums landfill gas in a boiler to produce high-pressure steam, which then drives
 a steam  turbine to generate electricity.  A large  amount of gas is needed for economic and efficient
 operation; the result is that only a few U.S. sites use this approach, with few additional candidate sites
 apparent where a stand-alone plant might be attractive.  The economic difficulties of scale are a lesser
 problem,  however, if landfill gas can be delivered  to supplement the conventional fuel at a conventional
 steam-electric power plant: limitations here can  be either piping costs or the on-stream time of the
 conventional electric plant.

 3.1.7  Purification to pipeline quality methane
 Very stringent cleanup technology is applied to remove all components except the desired methane at a
 small  number (under  10) of the larger U.S. landfills  to produce gas for pipeline use.  The principal
 objective not required of other cleanup approaches is neatly complete COg removal, but the criteria are
 also stringent for the removal of other contaminants.  The technology for cleanup to pipeline standards
 (with needed gas compression to pipeline pressure) is expensive; most such projects were initiated in the
 U.S. at larger landfills, where the  economics of scale are  attainable, during the early 1980s when gas
 prices were high. Projects operating today all have favorable long-term contracts.

 Several technologies are available for the necessary cleanup. Many of these originated as C02 removal
 approaches applied first in the natural gas industry, through further adaptations for landfill gas appear to
 have been major. Details of these can be found in several  sources, including a  rather comprehensive
 review by Koch. 1986.  The largest operator of facilities producing pipeline methane from landfill gas is Air
 Products and Chemicals, Inc. (APCI) and the process in use by APCI is the Gemini® process; provisions
 for this process's contaminant removal and destruction are interesting  and discussed  in Koch, 1986.
 Because of recently falling natural gas prices,  and because the largest landfills with best economics of
 scale already have energy projects, additions to pipeline quality gas production from landfill gas in the
 near future may be limited.

 3.2  Potential Future Technologies

 Landfill gas may be applicable  to several technologies under development; these include  fuel cells,
 compressed gas vehicle fuel, and possibly synfuels production. A brief review follows.

 3.2.1  Fuel cells
 Fuel cells are essentially  electrochemical  batteries.   They  can operate on various primary  fuels
 (feedstocks) such as oil, natural gas, or coal.   The potential primary fuels include landfill gas.  As an
 intermediate step the primary fuel is converted  at high temperature to 'synthesis gas,'  which is a mix of
 hydrogen, carbon monoxide and dioxide, and other gases. This synthesis gas is what feeds the fuel cell.

 Further discussion of fuel cell operation on landfill gas is presented in Leeper, 1986.  Advantages  include
tow emissions and quite high thermal efficiency (near 40 percent).  It is a technology that has particular
PJQ G640101A.AOW                           12

-------
 promise for economical electric power generation on a smaller scale.  The technology is considered
 sufficiently interesting that the U.S. EPA will be funding further trials (Sandelli. 1992).

 3.2.2  Compressed gas vehicle fuels
 Vehicle fueling with compressed methane is of high interest for environmental and other reasons, and
 technology  for such fueling is advanced. It was reported that in 1990 at least 700,000 vehicles operating
 worldwide were fueled by natural gas (Rosen, 1990); such fueling is economically competitive  in several
 situations, and expanding.  Digester gas has also been used at sites including Modesto and Los Angeles,
 California (EMCON, et al., 1981).  Using landfill gas would involve some purification, possibly to near
 pipeline quality, then compression of the purified gas for reduced-volume storage and use  on board
 vehicles equipped with conversion kits. Although landfill gas applications have apparently been few, an
 early study (EMCON,  et al.,  1981) projected favorable economics.  The most attractive use is for fleet
 vehicles, and in particular refuse trucks, which would need to return frequently to the landfill where the
 gas would  be available.  Gas availability and economics both dictate that the vehicle fleets should be
 large.

 3.2.3  Synthetic liquid fuels and chemicals

 Various  technologies  are available  that could convert landfill gas  to  liquid  fuels.  These  include
 hydrocarbon production by Fischer-Tropsch, methanol synthesis by various routes, including  chemical
 catalysis at high pressures (Ham et al., 1979), or by partial biological oxidation.  Most of these synfuels
 approaches have been examined for large-scale feasibility using feedstocks such as gas from coal.
 Synthesis gas-based  chemical  processes (for example,  acetic acid  manufacture) are  also  possible.
 These technologies are projected to produce expensive products, even at the larger scales. The principal
 difficulty with any of these, particularly fuels, would be that landfill gas generation can support a plant size
 that is generally only 1 to 10 percent of the plant size normally contemplated for these technologies. The
 small scale  required with using landfill gas would appear to imply very high costs.
PJG G640101A.AOW                           13

-------
                             4. COST AND REVENUE COMPONENTS
 This section addresses cost and revenue components and particularly issues such as site specificity and
 cost variability that are considered to be important to energy users. It is not intended to provide extensive
 cost detail here, although some examples of costs  and  cost  ranges are provided for illustration.
 Comment is also presented on issues including electric revenue requirements, initial cost estimating, and
 economics as barriers to landfill gas energy applications.

 4.1 Components of Cost and Income

 The cost and  revenue  factors to be  considered consist of  (1) capital costs,  (2) operations and
 maintenance costs. (3) royalty payments, (4) tax and other credits, and (5) energy-related revenues.
       • Capital costs include costs associated with energy  conversion and sometimes other
         associated equipment such as that for gas extraction. They normally include the "up
         fronr costs of implementing the project and plant, and may include other large lump
         sum costs incurred during  the project, such as for equipment  replacement.  Some
         examples of  capital costs  include  those for  initial  site  improvements,  energy
         equipment, buildings, and pollution abatement equipment. They can also include initial  .
         legal costs, commissions, rights to gas. permits, and the like.  They can vary widely as
         discussed shortly.
       • Operating and maintenance costs include costs  associated with operating and
         maintaining the capital plant.  Items such as labor, equipment maintenance, materials,
         debt service, and relevant taxes fall in this category.  Operating and maintenance costs
         can  vary substantially  and  depend on  factors  including  the  end   use, landfill
         characteristics and configuration, gas composition,  local rules and regulations, and
         many others.

       • Royalty payments are continuing costs that are usually proportional to energy revenue.
         Royalties are negotiated and  are occasionally changed as the marketplace, or other
         factors,  change.  Royalties may be  paid to the landfill owner, owner of the gas
         extraction or delivery rights,  or initial project developer. When they exist (a fair fraction
         of projects have none) they are usually in the range of 5 to 20 percent of gross energy
         sales.

       •  Federal tax credits are benefits proportional to gas energy delivery that were legislated
         by Congress (Section 29 of  the IRS code).  These credits are a direct dollar-lor-dollar
         offset to federal tax that would otherwise be payable by the business entity providing
         the gas.  The tax credits are allowable for extraction systems installed before the end
         of the year 1992 and will extend through the year 2002.  They have had ± significant
         effect on  improving economics and viability of projects that might otherwise not have
         been implemented.

      •  Revenues for energy sales are most frequently  based on prices of competing fuel or
         energy. They can be based on costs of the equivalent in heating value of a fuel grade
         petroleum product, on electricity sales (where cost is  fixed by provisions of PURPA), or
         on other energy commodities. Energy market  price fluctuations can materially and
         often adversely affect economics. Long-term contracts can often be executed, that fix
         prices per unit of output and  provide a substantial degree of security to developers.
PJG G640101A.AOW                           14

-------
 Possibly the most important aspect of costs, revenues and other benefits is their specificity to site and
 situation; the site-to-site variation, even with the same application and scale, is far greater than is usual
 with other energy technologies. The reasons include
       •  Component capital cost variations:   Key components such as  gas cleanup, utility
         provisions (e.g., on-site water supply), and utility interconnects can vary in cost by at
         least an order of magnitude.  Other capital costs, such as those for gas and power sale
         contract rights and pipelining, can be zero for many projects but may add substantial
         percentages (up to 25 percent or more  of the costs)  to others.  Energy equipment
         costs can vary depending on details and whether the equipment is new or used.  Fixed
         costs, which are proportional to capital costs, vary correspondingly.

       •  Operating cost  variations:   As  an example,  landfill-gas-specific maintenance costs
         relating to gas contaminants can vary by up to an order of magnitude.  Other costs
         such as royalties (where they exist) and operator cost can vary several fold.
       •  Benefits accruing per unit of energy delivered can vary (by about a factor of five for the
         example of electric power), and also depend on whether the energy is sold to the utility
         transmission system or avoids utility retail cost.  Nonenergy credits  allocated for
         benefits such as for gas system maintenance  and adjustment, and  emission control
         vary widely.

 Development of detailed economics regarding application, scale, and the host  of site-specific factors that
 can exist is, as noted, beyond the scope of  this report.  (Also it should be noted that costs may be
 expressed  in several  different ways in literature sources, with many data appearing contradictory).
 Further  discussion of various categories  of  costs—capital and capital-related, operating costs, and
 revenue and benefit components—is presented in appendix F.  Examples of cost data, presented next,
 illustrate some typical costs and their levels of variation.

 4.2  Cost Data: Examples

 4.2.1  Hypothetical generating facility example: Cost component ranges

 Table 3 presents example ranges for cost and benefit  components that  might be experienced for the
 hypothetical case of a 1  MW electrical generating facility.  (As stated earlier about 65 percent of  landfill
 gas  energy facilities involve  electrical  generation).   Note  that capital  costs  are  installed, that is,
 engineering, design, permitting, and other costs are factored  into the costs; ranges  given are "best
 estimates" generated by the authors for this report.  The ranges suggest the potential for cost variability,
 even where (as in this example) the  application (electrical generation) and scale (1,000 kW) are fixed.
 Note that electric sale price and other benefits per unit output may vary over  an even greater ratio than
 cost factors. Economic factors may impede the energy use of much of the landfill gas that is generated,
 as discussed in more detail below.

4.2.2  Reported electric facility capital costs: GAA Yearbook

Some reported data on capital costs for electrical generation, are also illustrative.  In the Government
Advisory Associates'  1988-1989 Methane Recovery from Landfill Yearbook, 38 electrical  generating
facilities report information (capital cost and nominal electrical generating capacity) from which costs per
kilowatt of capacity may be calculated. The figures are for both current and projected facilities, including
intemal-combustion-engine-based facilities, gas turbine facilities, boiler/steam turbine electric facilities,
and in some cases facilities using unspecified generating methods. The capital cost per kilowatt for each
of these individual facilities, coded by facility type, is plotted against plant capacity in figure 1.  All costs
have been adjusted to 1991 dollars. The data probably have imprecisions for several reasons (additional
plant costs experienced for postconstruction modifications may  be omitted, experienced output may not
PJG G640101A.AOW

-------
        TABLE 3. COST AND REVENUE RANGE FOR 1 MW ELECTRICAL ENERGY PROJECT
  Capital Cost Ranges (Basis: 1 MW capacity)
                          Range of Capital Cost
                                 (thousands)
        Administration, Development and other1
        Extraction system
        Pre-treatment system
        Energy conversion equipment
        Typical Range2
                                  30 -1,000
                                 200 -1.000
                                  10 -500
                                 500 -2.000
                                 850 -4.500
 Typical Operating Cost Components
        Operations and Maintenance
        Debt Service (interest and amortization)3
        Return on Investment (ROI)3
        Other (royalties, etc.)
        Typical Range2
                                 $/kWh
                          0.01
                          0
                          0.01
                          0
                          0.03
0.03
0.04
0.04
0.02
0.09
 Typical Revenue Components
        Tax Credits (where applicable)
        Other benefits (see text)
        Electric Power Sales

        Typical Range2
                          0
                          0
                          0.02

                          0.03
0.011
0.01
0.104

0.11
 Notes:
 1. Costs could include payment for the rights to the gas, or for the power sales contract, or to obtain an
 equity position in the project: see section 4.1 tor more detail.
 2. All extremes are unlikely simultaneously within the same project, so typical ranges are less than
 possible span through adding components.
 3. ROI may substitute for debt service - one will increase as the other decreases.
 4. May include capacity payments as well as payments for kWh delivered.
PJG G640101A.AOW
16

-------
 equal nominal,  and so forth).  However; the figure illustrates the variability (and, the lack of obvious
 pattern) of landfill gas  electrical generating facility capital  costs, even allowing  for the  databases'
 imperfections.  The cost data and their scatter are undoubtedly explainable on the basis of site features
 and variables discussed above but detailed analysis is necessarily outside the scope of this report.

 4.3 Other Economic Issues

 In  addition to cost ranges, of interest to many energy users will be the range of required revenues, the
 uncertainties of initial cost estimating, and constraints of economics  on energy uses.  Each of these
 issues are discussed as follows.

 4.3.1  Revenue requirement for electric power generation
 The  average power revenue required to justify an  electric generation  facility at a scale of I.OOOkW
 (1  MW) or greater is regarded as being most typically about 5 to 8 or more cents per kWh3. Caveats are
 that the equipment must operate with an acceptably low down time and few problems due to factors such
 as energy equipment breakdowns or gas supply problems. There are obviously also sites where costs
 combined with return criteria can result in sale prices both above and below this range.

 4.3.2  Initial cost estimating

 Accurate initial cost projections are difficult to develop, and initial cost underestimates—leading to unwise
 projects—are frequently  made (this problem is exacerbated when additional costs, such as for improved
 gas cleanup, or equipment modifications, are found to be necessary as the project proceeds).  Those
 interested in developing economics for applications may wish to develop their initial data working with
 others experienced with  landfill gas energy applications. The intricacies of costing and implementing an
 energy application are such  that many—possibly most—of the smaller landfill owner/operators tend to
 form partnerships and participate with entities already experienced in landfill gas energy applications, who
 can provide help  in  stages throughout a project:  examining use options,  projecting economics, and
 continuing through selecting and implementing the (presumably) best option.

 4.3.3  Economic Impediments to energy applications

 Landfill gas energy projects, including some of those to be described later in this report, can do well
 economically.  However, as  can  be inferred from tables and  figure  1, low energy sale prices can
 combine with high capital and operating costs at many sites. Individual landfills with substantial methane
 generation often cannot find economic energy applications for the gas, and their  energy potential is
 wasted.  Well-developed options for energy applications for smaller landfills and generation rates are also
 lacking.  Precise figures are not available but based on GAA (1988), a very small percentage (well under
 10 percent) of landfills with outputs less than 200 cfm output (that could support 500 kW) appear to have
 energy systems. Those means suggested for barrier reduction and facilitation of energy uses under less
 than favorable circumstances are referred to in Section 6.
3  Authors' estimates; also discussed with Christine Nokn. Cogeneration and Independent Power Producer* Coalition, Washington,
   D.C.
PJG G640101A.AOW                           17

-------
                                        Q (5000/kw)
        3000
        2600
       a
       "3
        2000
00
      CD
      0)
£
O
         1000
      III
      a.
         1000
      O
      o
         900


1























T



•











1


























1












































1
i

1
X

1



1

1

Q

1
1

X








1











X







X
1
t











>


Q











































1
8


•


1



'
|











.




































LEGEND
1 - Internal combustion engine
_ 8 - Steam turbine electric
Q - Gas turbine
X - Equ
in y
ipment
earboc
not
•k
ape
cifl
ed














           100
             200
600
20.000
                  1000     2000        6000      lOjQGO
                     SIZE OP FACILITY (Kilowatts)
                          Figure T
         COSTS PER KILOWATT VERSUS SIZE
For 38 facilities reporting capital costs in 1988 "Methane Recovery
           From Landfill Yearbook* published by GAA
60.000
                                                                 100.000

-------
                                     5.  CASE STUDIES
 This section describes experiences with projects where landfill gas has been used in energy applications.
 These  include sjx projects in the U.S.,  references to four case  studies in the U.K. (provided as
 appendix K) and  a discussion  of  other  relevant literature.   The  case studies provide information
 considered of most interest to readers (including, in. particular, potential energy users) such as how the
 decision to implement the project was made, facility details, and particularly the energy equipment, and its
 experienced performance and economics.

 It should be recognized that limits exist on the amount of detail that can be presented for each case.
 Information presented in various areas is intended to be illustrative and representative (rather than
 comprehensive): it is hoped that It will nonetheless provide readers with useful overviews of each project's
 experience.

 5.1  Electric Power Generation and Space Heating Using Landfill Gas: Prince
     George's County, Maryland

 5.1.1  Introduction and general overview

 The Brown Station Road Landfill is  located in Prince George's County about 15 miles east-southeast of
 downtown Washington, D.C.  Gas from the landfill is used to supply  both the electrical and the heating
 needs of a County building complex and also electricity for export sale to the local utility. The energy
 equipment  comprises  a landfill gas cleanup and pumping station, a 2-mile pipeline, three engine-
 generators, and a boiler that  supports the heating and hot water system of the 235,000-square-foot
 County Correctional Complex (jail).   The facility was engineered by  the Maguire Group, Inc., of
 Foxborough, Massachusetts.  Curtis  Engine of Baltimore, Maryland,  the regional Waukesha Engine
 distributor, was also heavily involved in subsequent operation of the project. A photograph of the engine-
 generator set at the site (discussed later) is shown in figure 2.

 General site and facility  information is shown in table 4.  The facility  was wholly financed and is wholly
 owned by Prince George's County.  The County also receives all benefits; these  include the  operation
 and management of the landfill gas extraction system, avoided costs for electrical power and heat for the
 correctional facility, and revenues from power sales to the local utility, Potomac Electric Power Company
 (PEPCO).  The energy facility  met more than 99 percent of the heat and electrical  needs for the
 correctional facility in the County's most recently ended fiscal year.  The gross benefits to the County are
 calculated to currently be running about $1.2 million per year.

 5.1.2  History of project Implementation

 Initial impetus for the Brown Station Road landfill energy  project came from Prince George's County.
 County staff recognized  in the early 1980s that landfill gas emissions would need to be abated by a
 landfill gas system and, that the gas would also represent an energy resource. Help from the Applied
 Physics Laboratory at Johns Hopkins University, which was conducting landfill gas  related investigations,
was obtained  in 1982.   The Laboratory used Brown Station Road  waste placement data to develop
 methane generation projections, and carried out preliminary economic projections; results showed that
sufficient gas would be available to support an  energy recovery system, and that energy recovery had
favorable economics.
  PJG G640101A.AOW                         19

-------
'O
                       Figure 2       Waukesha Engine-Generator Sets at Brown Station Road Landfill.  These engine generator sets
                                     furnish nearly aN electrical needs of nearby correctional complex.

-------
           TABLE 4. GENERAL FEATURES: BROWN STATION ROAD ENERGY FACILITY

 Location: Brown Station Road, near Upper Marlboro, Prince George's County, Maryland (15 miles east of
 Washington, D. C.)
 Application: Electric generation and space heat.  Electric and gas utilities are supplied to a 235,000-
 square-fool County Correctional Complex; surplus electricity is sold to the utility company.

 Energy equipment: Pumping station, 2-mile pipeline, three Waukesha engine-powered generators,
 correctional complex space heating and hot water system

 Equipment owned by:  Prince Georges County

 Equipment operated by: Curtis Engine
 System design: Maguire Group
 Landfill owner and operator: Prince George's County
 Current tonnage in landfill:  Approximately 4 million tons

 Gas collection:  County owned, operated by Curtis Engine

 Maguire Group Inc., an architectural/engineering and planning firm (then known as CE Maguire)  of
 Foxboro, Massachusetts, was retained by the County to evaluate the technical and economic feasibility of
 potential landfill gas uses.  This study used the sustainable extraction rates established in the John
 Hopkins report. Maguire's analysis examined the County energy demands and use options.

 Based on  probable methane availability, Maguire developed several different energy  system options
 involving variations on both equipment and timing of installation.  In order of complexity and also rates of
 methane use (increasing from A to F below) the options were

     A.  Heat and hot water to correctional complex
     B.  Heat, hot water and steam absorbtton air conditioning to correctional complex

     C.  Heat, hot water and power to correctional complex.
         (Three generators, surplus power to PEPCO)

     D.  Heat, hot water and power to correctional complex
         (Four generators, surplus power to PEPCO)

     E.  Heat, hot water and power to correctional complex
         Heat, hot water to Upper Marlboro County Building Complex (UMC)
         (Three generators, surplus power to PEPCO)
     F.  Heat, hot water and power to correctional complex
        Heat, hot water and power to UMC
        (Four generators, surplus power to PEPCO)
Comparison was on life cycle costs, revenue, and  other bases.   From these, the County selected
option C: to use landfill gas to directly supply the heating system of the correctional complex, and to fuel
gensets to provide power to the correctional complex and  for export.  The possible financing and
ownership options were also evaluated, and county ownership with  municipal  bond financing was
selected.
The energy system was implemented in a phased program beginning with initial design, and construction
of the landfill  gas wells.  This was followed by installation of the compressor building, gas transmission
  PJG  G640101A.AOW                        21

-------
 line, and engines. The energy system was completed concurrently with the County Correctional Complex,
 the needs of which it was to supply. The first electricity was produced by the facility in July 1987.
 Note that the negotiations with PEPCO, regarding sales price for cogenerated power and cost recovery
 mechanisms for the two-way interconnect, were quite extensive (and were not completed until June 1990,
 almost 3 years after the first power production).

      TABLE 5. LANDFILL AND GAS SYSTEM CHARACTERISTICS: BROWN STATION ROAD

 Landfill
       Location: Off Brown Station Road, Prince George's County, 15 miles east of Washington, D.C.
       Type:  Mound Rll
       Date Opened: 1960
       Waste in Place: Approximately 4 million tons
       Current Waste Fill Rate: 450,000 tons per year
       Total Fill Area: 100 acres
       Area Now Riled:  40 acres
       Area of Extraction: 20 acres
       Climate: Temperate, seasonal
       Annual Rainfall: 45 inches
       Daily and Intermediate Cover Soil: Various, as available
       Rnal Cover Soil:  2 feet of day
       Depth of Waste: Approximately 100 feet
Gas Extraction System
       Type: Vertical wells—currently 29 active
       Collection Unit Pipe Material: PVC
       Lateral/Main Header Pipe Materials: HOPE and PVC
       Location of Piping: Laterals and main header about 1 foot below surface
       Collection System Details:  Spacing between wells at 200 feet.  Depths are 60 to 80 feet (or 60 to
       80 percent of the waste depth)
       Current Collection Rate:  695 cfm, or 1,000,000 cfd
       Well Adjustment Protocol: Wells below 50 percent methane throttled, over 50 percent opened, as
       required
       Gas Analysis: 55 percent methane by volume
       Gas Analysis  Frequency: Six times per month
 PJG G640101A.AOW                        22

-------
 5.1.3  Landfill and landfill gas system

 Details of the landfill and landfill gas system are shown in table 5. The Brown Station Road Landfill is a
 "mound fill," that is, it lies over the original soil surface in its "footprint."  The landfill generates methane at
 a rate in excess of current energy conversion needs; generation is expected to increase still further as the
 filling continues at the current rate over the next 10 or more years.
 One noteworthy aspect of the landfill's gas is Its content of halogenated organics. These are indicated by
 a total chlorine content measured (in early tests by Waukesha, provided through Curtis Engine) at 200
 micrograms per liter (jig/I).   Waukesha states that these  measured concentrations were  among the
 highest in Waukesha's experience and certainly are related to some initial engine problems (discussed
 later).

 Also worth mentioning are the gas system's past problems of a not-uncommon  type associated with
 differential landfill settlement which resulted in pipeline blockages from condensate  pooling at low points.
 Gas supply limitations due to blockage became so severe  that much of the original system had to be
 replaced in 1990; the extraction system has worked well since the 1990 repairs.

 With the initial problems now corrected,  methane and gas field monitoring and adjustment by Curtis
 Engine, a gas stream of good quality (55+ percent methane) at a rate of up to 800 cfm is provided to the
 energy facility with standard monitoring and adjustment procedures.

 5.1.4  Energy facility and equipment

 A schematic/block diagram of the facility's landfill gas processing  and energy equipment is shown in
 figure 3.  For convenience, the energy system discussion covers (sequentially) the components of the
 compressor station, the pipeline, the electrical generating station, and the heating  and boiler system of
 the correctional complex. A list of significant equipment items in each of these categories is presented in
 table 6.

 Compression station  and  Initial  gas pretreatment.   The  current configuration has been  modified
 somewhat from its initial design (further discussion later). Gas from the collection system arrives at the
 compression station at a pressure, determined by rate of energy usage, that at high gas use rates is
 about -20 inches water gauge. A 1.500 gallon inline tank is used to intercept and collect condensate.
 Gas then  passes through moisture separators and a coalescing fitter. Gas pumping is by four oil-
 lubricated  compressors,  located after the coalescing filters.  These compressors are driven by smaller,
 dedicated  1C engines, fueled by the processed landfill gas. Gas, pressurized to 100 psi, is then cooled to
 36*F in an aftercooler from which further condensate is drained; the gas is then sent through  a  demister
 and several further steps including fittrations and a desiccation step, to a dewpoint of approximately 20T
 (see figure 3).  After desiccation,  gas is odorized for safety, using conventional natural gas odorant.  A
 stream of gas is extracted to fuel the compressor engines  (described above), with the balance of the gas
 being  pumped through the  pipeline (specifications shown in table 6) to the gensets and correctional
 complex.

 Engine-generator building. At the engine-generator building, after passing through further fitters, the
 gas  fuels a set of three Waukesha lean-bum engine powered gensets (table 6).   These gensets are
 providing almost all of the correctional complex's electrical  needs (99 + percent, discussed later).  To
 reduce noise to the adjacent correctional complex and the  surrounding area (which is populated), the
 engine-generator building is double-walled.

 Correctional complex heating and cooling. The rest of the landfill gas from the  pipeline goes to fuel
the heating and hot water system of the correctional complex. This  is a system based on two  Cleaver-
Brooks 350 hp package boiler units of largely conventional design capable of operating on Number 2 fuel
oil, or pipeline natural gas.  Adaptations enable operation on, and  easy switchovers among, the fuels.
When operated on Number 2 oil, County records show that it would consume about 650,000 to 700,000
gallons annually.
  PJG G640101A.AOW                         23

-------
                                     J
EXPORT TD
 UTILITY
          ELECTRIC
         V
           POWER
                  GENERATORS
                 \ EXHAUST TD
                   ATMOSPHERE
               WAUKESHA
                ENGINES
                  (3)
    CORRECTIONAL COMPLEX:
    HEATING, HOT  WATER  AND
    ELECTRICAL NEEDS
           CLEAN GAS FOR
                                         PIPELINE
                                          2  MILES
         HEAT AND BOILERS

                 GAS FOR COMPRESSOR
LANDFILL GAS (LFG)
FROM COLLECTION
   SYSTEM
                       CLFG),
1
             CONDENSATE
             COLLECTION
                TANK
           V\
                                          ENGINES
                              FILTERS
                                IN
                              SERIES<2>
                                                                               FILTERS
                                                                                 IN
                                                                               SER1ESC2)
                                                             A
ENGINE POWERED
COMPRESSORS ON
SKIDS (4 SKIDS)
                                                  AFTERCOOLER
                                                             (LFG)
                                              FILTER
DESICCATOR
                                            CONDENSATE
                                        Figure  3
                Energy  Facility At  Brown Station Road Landfill
              Simplified  Block  Diagram  Showing Major  Components

-------
         TABLE 6. MAJOR EQUIPMENT ITEMS: BROWN STATION ROAD ENERGY FACILITY


  Plant Inlet Section (Through Compressor)

       Condensate collection on inlet header from gas collection system: 1,500-gallon fiberglass tank,
       unbaffled

       Compressor building (at landfill)

       • Moisture separation: Mist pads manufactured by NECO Industrial Plastics

       • Compressor skids (four in parallel):  Sullaire screw compressors, model  SA-581,
         550dm; Waukesha F1197 GU  engines (215hp) to drive compressors; Waukesha
         model 04M heat exchanger for gas cooling

       • Desiccator   Henderson Engineering  Model HP-2400  (uses Mrty-Dry  proprietary
         desiccant, dewpoint -20*F)

       • nitration:  Four finite element filters, 0.3 micron nominal cutoff, one before and three
         after desiccator

       • Further gas filtration for compressor engines: Nelson and Pall well filters, 0.3 micron
         absolute cutoff

  Pipeline and Energy Equipment

       Pipeline: 2 miles long, 8-inch diameter, schedule 80, carbon steel, polyethylene coated and
       cathodteally protected

       Engine-generator building (double walled for sound suppression)

       • Landfill gas prefiltratton before gensets: One Pall well 0.3 micron absolute cutoff, three
         Nelson models 95802A

       • Three Waukesha 5970 GL gensets,  nominal rating 850 kW each.  Engines modified
         with chrome valve stems and guides, modified piston rings.
      Correctional Complex Energy Equipment

      •  Heating System: Two Cleaver-Brooks fire tube package boilers, 350 hp rating.  Heat
         provided by hot water through coils; domestic hot water also provided.
 While the landfill-gas-fueled energy facility meets most correctional complex needs, uninterrupted utility
 supplies are obviously of utmost importance and the complex also has conventional utility hookups.
 Performance and availability, Initial experience.  This system was one of many landfill gas energy
 projects that have encountered serious (but not insurmountable) problems, in this case on start-up. One
 of the lean-bum Waukesha engines had operated for less than 500 hours in 1987 when, before the first
 scheduled oil change, the engine seized. Examination of the seized engine showed evidence of serious
 corrosion (paint peeled from interior crankcase parts, discoloration and serious deposit buildup on metal
 surfaces). The engine had seized because deposit buildups had reduced piston clearances to zero; high
 levels of oil contaminants were found.

The situation was reviewed by Curtis, Waukesha, and others.  Landfill gas from the Brown Station Road
Landfill was confirmed to contain high levels of chlorinated organics (which as reviewed earlier, combust
to acid products that in turn cause damage).  The facility's gas cleanup system (which  had an  initial
  PJG G640101A.AOW                        25

-------
 design that appeared relatively conservative by standards of successful energy systems elsewhere) was
 modified.   The modifications, made with major input from Curtis, Waukesha  and Maguire included
 additional filtration and substitution of stainless for carbon steel piping  in the plant  sections before
 desiccation, resulting in the current configuration.
 Waukesha, through Curtis, also applied engine modifications developed to address landfill-gas-related
 problems.  These included hardened valve guides, chrome valve  stems,  modified piston rings and
 elevated coolant temperatures. Operations were also modified, including more frequent oil checks and
 changes.
 Although satisfactory engine operation was obtained with  these  modifications, gas recovery system
 problems associated with landfill subsidence also occurred during and after the initial engine problems; as
 noted, gas supply inadequacies restricted operation and were only fully resolved with replacement of part
 of the gas system in 1990.

 Brown  Station  Road experience provides a good  example of the severity  of problems  sometimes
 encountered in energy conversion projects. Between July 1987 (when electricity was first generated) and
 the present, losses of generated electric power, due to corrosion problems and associated retrofits, and
 gas supply system problems,  probably amounted to between one and two years of production at the
 capacity that would have been expected without the problems. The Brown Station Road problems might
 be considered "shakedown" in nature; such problems are generally most frequent in projects early on.
 Performance after modifications.  The  combination of modifications to the gas  cleanup train, the
 engines, and the gas collection system resulted in an integrated system that has subsequently worked
 very well.

 Regarding electrical production, the engine-generators at full power produce a combined electrical power
 output of approximately 2,300 kW (nameplate rating of 2,550 kW, less a 10 percent reduction for CO2
 dilution with landfill gas).  Averaged on-line availability of the three engines—when  not limited by gas
 recovery system problems—is  estimated by Curtis to be about 92 percent.  Power purchase records for
 portions of  1988 (when the just-operational correctional complex was fully supplied by PEPCO utility
 power during the  cited engine and other difficulties) indicate that caseload demand at that time  was
 800 kW, increasing to an averaged rate of 1,400 kW in midsummer in the daytime peak hours (defined by
 PEPCO as  8 hours per day).  Available records are not in a form that permits  precise determination of
 ongoing electrical  use by the correctional complex; indirect evidence  (see 5.1.9) suggests it is 1,000 or
 more kW caseload, and 1.700KW  summertime  peak (peak use period defined by PEPCO utility as
 860 hours per year).  Whatever the exact  use, County electric billing records show that the complex's
 power purchase from PEPCO was so low that the gensets unquestionably  met  more than 99 percent of
 the complex's needs (the County calculates 99.9 percent tor the fiscal year ended June 30.1990; PEPCO
 indicates the facility had purchased no power from  October 1990 through June 1991 )4.  The current
 power supplv reliability (with corrosion and other problems now under control) would appear in large part
 a function o! conservative design, for  example, the high redundancy inherent  in three parallel engine-
 generators, tne four engine-compressor units at the compressor station, and the high degree of parallel
 processing elsewhere in the system.  The high level of on-line availability and reliability is also obviously a
 function of the efforts of Curtis, the operating contractor.
 Regarding the heating system, the County reports advantages with running the heating and boiler system
 on landfill gas.  The landfill-gas-fueled boilers are observed to be cleaner than oil-fueled boilers. Boilers
 are inspected once a year; maintenance is by contract to Professional Boiler Works, Inc., and to date
 very little maintenance has been needed. External fuel purchases are extremely tow; based on outside
fuel purchases and assumed annual displacement of the alternative use of 650,000 to 700.000 gallons of
Number 2 fuel oil (see 5.1.9). the County calculates that landfill gas provided 99.3 percent of the fuel for
heating and hot water needs in the fiscal year ending on June 30.1990.
   Personal communication, David Leonard. PEPCO. July 1991.
  PJG  G640101A.AOW                         26

-------
 5.1.5 Environmental/emissions

 The County reports only that the facility complies with all federal, state, and local emissions regulations.
 The Brown Station Road landfill gas emissions that would otherwise occur through the surface of the fill
 are also being abated satisfactorily. Note that the Brown Station Road landfill is 15 miles from downtown
 Washington, D.C.; although the surrounding area is densely populated compared to most landfill sites, the
 County reports no odor complaints.

 5.1.6 Operation and maintenance

 The Prince George's County Brown Station Road facility, with multiple gas end uses, is one of the more
 complex U.S. facilities.  The facility also has a more comprehensive maintenance contract than most,
 through Curtis Engine.  The County has four separate contracts with Curtis; contract components cover
 maintenance of engine-generator sets, maintenance of the compressor station, overall operations, and
 compressor building maintenance.  (Certain of the  contract payments to Curtis are tied to attaining
 performance standards for the gensets.)

 On-site energy equipment  repairs and routine maintenance are performed by an on-site employee of
 Curtis Engine. Additional support is given as needed; Curtis estimates that 16 labor hours per week are
 spent on the energy equipment routine maintenance.  Additional time and maintenance is spent on more
 significant repairs including parts replacements and overhauls.   Curtis not only operates and maintains
 the  energy equipment but also monitors and adjusts the gas field under existing  contracts.  Economic
 aspects of operation and maintenance are discussed in section 5.1.7.

 Some of the engine  operation and maintenance modifications  by Waukesha  and  Curtis for landfill gas
 fueling are shown in table 7. These include higher oil and jacket water temperatures, frequent oil checks
 for contaminants and  metal content as an indicator of wear, and  others as shown.  (Engine part
 modifications for landfill gas operation were discussed in 5.1.4.) Oil  changes require two labor hours.
 Some of the other maintenance tasks are destecant replacement and yearly replacement of the first finite
 filter element. The elements of other landfill gas fuel filters have been analyzed by their manufacturers
 but none have shown appreciable contamination in 2 years of operation.

 To date, the gas transmission pipeline has needed no maintenance, which is  a normal expectation with
 pipelines but also would appear to attest to  the effectiveness of  gas moisture removal and cleanup in the
 compressor station.  One ongoing operational requirement for the pipeline is the flagging* and location
 service to delineate the  pipeline's location  and prevent damage by  excavation. This  is a modest effort
 performed by an organization specializing in such work.

 The  prison  heating system is  reported to  require  no more maintenance  than a  system operating on
 pipeline gas. The operating history on landfill gas  (since 1987) has, however, been relatively short; no
 further information is available.


    TABLE 7.  ENGINE OPERATING CONDITIONS ON LANDFILL GAS: BROWN STATION ROAD

Jacket temperature range: 220 to  230T (104 to 110*C)

Oil temperature range: 190 to 195T (87 to 90*C)

Oil used: Mobil Pegasus 446, TBN over 7.0

Oil Analyses: Every 350 hours
Maximum oil change interval: 350 hours for 5790GL (Genset engines) and 500 hours for 1197
(compressor engines)
                 AOW

-------
 5.1.7  Economics
 A summary of the economic data is shown in table 5.6.5. and derivations (or origins) are discussed next.

 Capital  cost.   The value which should be assigned  to the capital cost of  the facility is difficult to
 determine.  The proceeds of a $6.1 million County bond  issue were used in financing but what part of the
 bond proceeds was allocated to the initial construction is not dear (and how subsequent repair costs
 should be treated is an additional issue for capital costs). An estimate of $6.1 million for capital cost is
 used below; recognize, however, that this value is not certain.
 Benefits.   The gross cash  benefits to Prince George's County consist of several components: the
 avoided costs  of electric power and oil that would otherwise be  required for the correctional complex,
 cash revenues from electric power export sales to PEPCO, and benefits from abatement of landfill gas
 emissions that would otherwise be experienced without  the landfill gas energy use. These benefits are
 discussed next.
 Although correctional facility power-use figures  are not precise, available information does allow avoided
 electric power costs to be estimated, as set forth later in section 5.1.9.  Calculations suggest correctional
 complex electrical savings of about $450.000  to $600,000 per year.  An additional oil  cost savings of
 another $450,000 to $500,000 per year is implied by the avoidance of an estimated oil use of 650,000 to
 700,000 gallons per year (see 5.1.9). Through the contracts with Curtis, the County also avoids the costs
 it would otherwise  experience for monitoring,  adjustment, and repairs to the gas system, and blower
 operations  and maintenance.  These  gas system costs are  estimated based on  similar operations
 elsewhere at about $50,000 per year.
 Regarding sales to PEPCO  note that, until 1990, power sales to the utility were based on fuel cost
 avoidance only, which resulted in very low revenues to the County from the electric power sales. With the
 improved generation reliability, and the resolution of other contractual issues (including  mechanisms of
 PEPCO's cost  recovery for the two-way interconnect), the terms of the facility's cogenerated power sale
 to PEPCO are  much more favorable to the County; one improvement is a capacity payment (in addition to
 the normal payments per kWh) for summer peak hour exports that runs near $0.lO/kWh. Data from the
 County5 show sales of power to PEPCO in the range of $5,000 to $10,000 per month in early 1990 (until
.gas system problems were fully solved), but that are now increasing and closer to $20,000 per month.
 These figures would suggest power revenue from power export sales  at a present annual rate between
 $200,000 to $300.000 per year.

 As shown in table 8, the sum of the gross benefits, including both cash and "revenue equivalents'' to the
 County, derived as above (without  considering costs),  would  appear to be currently running between
 $1,150,000 and $1,450,000 per year.
 Costs and debits.  The operating costs and debits comprise various service contracts with Curtis Engine,
 a modest expense  relating to the pipeline, and payments on bonds used to finance the facility.  AH of
 these expenses are discussed next.
 Operating contract costs.   As  shown  in tables, the operating contract costs are  currently  about
 $400.000 per year (components were discussed briefly in section 5.1.6).

 Pipeline Costs. The flagging1' service discussed earlier is stated to cost the County about $3,000 per
 year.
5  Power sale and related records forwarded by Sheila Lanier. Prince George's County, to Don Augensttin. EMCON. June 1901.

-------
      TABLE 8. ECONOMIC DATA:  BROWN STATION ROAD LANDFILL GAS ENERGY FACILITY


 Estimated capital investment: $6.1 million

 Revenue, and avoided cost credits (thousands/year)

 Electrical costs avoided                    $450-600

 Heating fuel costs avoided                  $450-500

 Electric sales to PEPCO                   $200-300

 Gas System Credit                      	JSP.
 Total credits (approximate range)         $1,150-1,450


 Costs:

 Contracts, Curtis Engine                        $399
 Interest expense estimate (see text)            375-475
 Pipeline-related (delineation)              	3
 Cost (approximate range)                  $800-900

 Lower bound, operating cash flow - $1,150-900 « $250,000/yr
 Upper bound, operating cash flow - $1.450-800 « $650,000/yr


 Bond Interest costs.  The facility was financed principally by a $6.1 million bond issue, marketed at the
 extremely favorable interest rate of 5.4 percent. To reflect bond retirement and rollover to refinancing at
 current rates, which could be 7 to 8 percent, and to reflect uncertainties in capital costs, interest charges
 would more realistically be  expected to be about $375,000 to $475,000 per year. Further discussion is
 given in note 5.1.9.

 Operating cash flow.  The income less operating costs calculated and defined as above give rise to one
 possible definition of "operating cash flow," which (as shown in table 8) might be between $250,000 and
 $650,000 per year.  A profit/loss calculation would require further assumptions in several areas, such as
 depredation, and will not be attempted here;  however,  the current cash  flow situation would  appear
 favorable  for the County. If repairs and equipment .replacement costs do not exceed the operating cash
 flow, the long-term cash flow and profit situation will remain favorable.

 5.1.8 Discussion

 General performance.  After the "shakedown" phase in which problems with the gas system and engine
 operation  were resolved, the  entire energy facility associated with the  Brown Station Road  landfill,
 including a Degeneration facility and space heating, has  been functioning well.  The energy equipment
 provides essentially  all  heat  and power for  the  correctional complex,  as  was originally  intended.
 Increasing operating  experience and use of preventive maintenance, such as more frequent oil checks
 and changes, are reducing engine down time.  The system is generating a positive cash flow, and the
 long-term  prospects appear favorable.
 Plans. The County's capital improvement budget is currently extremely limited; however, with increasing
waste entering the landfill and expansion of the landfill gas system, more gas win become available. The
County is  beginning to consider options for which incremental cost may be acceptable and the return to
  PJG RR40101A AOW

-------
 the County favorable.  These include installing three more gensets, in extending the pipeline to serve
 another County building complex, or both.

 5.1.9  Calculation bases—energy use and financing
 As  stated in 5.1.4  and 5.1.6, available records do not allow correctional complex use rates to be
 determined directly.  It has been necessary to estimate various energy use and economic parameters
 indirectly, and the estimates and their bases are set forth below.
 Electrical power use and cost calculations.  Regarding electrical power use, electrical billings over
 intervals when the correctional complex was wholly supplied by PEPCO (in 1988) showed power use
 shortly after startup to be about 800 kW caseload, up to a peak (noon to 8 p.m. weekdays) of 1,200 kW in
 winter and 1,400 kW in summer. The estimated output of the gensets, based on discussions with Curtis
 and other information, is 2,550 kW (nameplate) x 0.9 (correction for CO2 dilution, landfill gas operation) x
 0.90 (service factor), which for a 730-hour average month gives an estimated total production of
 1,500+MWh per month.   The metering of correctional complex power  use  is not  directly available:
 however, the evidence suggests that its power use is substantially above 1988 rates. Power export sales
 at full capacity by the facility of 300 to 600 MWh per month shown by  1990 records, combined with
 generation of 1,500+MWh  per month suggests time  average  correctional complex power  use of
 1,250+ kW in winter and 1,600+ kW in summer, and an annual time average near 1,400 kW. A possible
 conservative minimum schedule for power use and cost is shown in table 9.
 This reflects, however, an  annual time average power use of only 1,150 kW.   Power  use estimates (by
 the  difference method above) suggest a possible annual time average use of as much as 1,400 kW and
 power costs nearer $600,000 per year. A range of $450,000 to $600,000 for avoided electric power costs
 has accordingly been used.

   TABLE 9.  POWER GENERATION AND REVENUE CALCULATIONS: BROWN STATION ROAD1

 Summer Averages
 Interval Duration       hr/yr           Use, kW      $/kWh        $/yr

        Peak          860           1,600         $0.04918      $67,671

        Int. Peak       860           1.400         $0.04286      $51,603

       Off Peak       1,880         1,000         $0.02790      $52,452

Winter Averages
       Peak           1,200         1.400         $0.04105      $68.964

       Int. peak       1,200         1.200         $0.03576      $51,494

       Off peak       2,760          900         $0.02322      $57,678

Demand charges
Summer $9£0/kW x estimated 1,700 kW peak use x 5 months • $80.750

Winter: $3.90/kW x estimated 1.500 kW peak use x 7 months - $40,950


Total annual estimated cost •  $471,562
1.  All rate information was provided by Fred Leonard of PEPCO.

-------
 Heating oil use. The correctional complex's potential annual oil use would appear to be about 650,000
 to 700,000 gallons per year (based on use rates while the landfill  gas pipeline was not in operation).
 Aside from price jumps occurring because of the Persian Gulf situation, before early 1991 the County had
 been paying a price (with vendor markup) of about $0.60 per gallon in  low-oil-use summer months,
 ranging up to about $0.80 per gallon in winter.  About 2/3 of the oil would be used in the winter.  An
 averaged overall cost of $0.70 per gallon multiplied by an estimated use of 650,000 to 700,000 gallons
 per year leads to an estimated cost saving of $450,000 to 500,000 per year, as stated in the text.
 Bond financing. The cost component for bond financing can be calculated in different ways that result in
 different values for this cost. Based on an assumed capital cost of $6.1 million and a repayment schedule
 with provisions for full bond retirement in 10 years, the cost of a $6.1 million  bond issue is about $805.000
 annually (Watts, 1987). This includes complete amortization of the bond principal over 10 years, which is
 a higher than appropriate cost to include, since the energy facility's life will be much longer than the bond
 term.  Interest charges on $6.1 million at 5.4 percent would be $329,000 per year; however if initial bonds
 at 5.4 percent are retired and refinanced ("rolled over) at a cost of 7 to 8 percent, bond interest cost will
 be $375,000 to 475,000 per year as stated; the range is rather wide to also  reflect uncertainties attaching
 to the tiue capital cost.

 5.2  Electricity Generation Using Cooper-Superior Engine at the Otay Landfill

 5.2.1  Introduction and general overview
 The Otay Landfill is located in Chula Vista, about  10 miles southeast of San Diego in San Diego County.
 California. The  energy facility at this site is owned by Pacific Energy (PEn).  It uses a Cooper-Superior
 engine-powered genset to generate electricity for sale to the San Diego Gas and Electric (SDG&E) grid.
 The facility exports a net  output of about 1.700 kW  at an averaged sale price with all utility payments,
 including capacity factored in,  of around $0.09 cents/kWh, and typically obtains more than $1 million per
 year in gross power sale  revenue. General information on the site  and facility is shown in table 10.  A
 photograph of the  Cooper-Superior engine at the site (discussed  in further detail  later)  is shown  in
 figure 4.

 5.2.2  Otay landfill and landfill gas system

 Details of the landfill and landfill gas collection system are listed in table 11. The Otay landfill is a large
 canyon type fill, opened in 1966.  PEn estimates that the landfill generates methane at a rate well beyond
 the needs of a single genset.   The fill is currently  served by wells extracting from only part of its volume.
                TABLE 10. ELECTRIC GENERATING FACILITY AT OTAY LANDFILL

Location:  Off day Valley road, 10 miles southeast of San Diego, California

Nature of Application: Electric power generation and sale to San Diego Gas and Electric Grid

Energy Equipment:  Single engine-generator set, net output range 1,700 to 1,750 kW, powered by
Cooper-Superior engine

Owner and operator of genset and auxiliary equipment: Pacific Energy

Landfill owner: San Diego County

Landfill operator: Herzog Contracting

Current tonnage in landfill: 6+ million tons

Gas collection system: Designed, owned, and operated by Pacific Energy
  PJG G640101A.AOW

-------
Figure 4      Cooper-Superior Engine: Otay Landfill Electrical Generating Facility

-------
               TABLE 11. LANDFILL AND GAS SYSTEM CHARACTERISTICS: OTAY


 Landfill
        Type: Canyon Fill
        Date Opened: 1966
        Waste in Place:  6 million + tons

        Waste Rll Rate: 500,000 tons per year

        Climate: Arid
        Annual Rainfall:  10 inches
        Final Cover Soil: Clay

 Gas Extraction System

        Type: Vertical wells
        Number Active:  32 wells (early 1991)
        Lateral/Main Header Pipe: Aboveground
        Waste and Well  Depth: Waste depth 90 to 150 feet; well depths approximately 75 percent of
        waste depths. Extraction zone: Bottom 40 feet.
        Current Collection Rate: 650-700 dm; 1,000,000 cfd (LFG)

        Well Adjustment Protocol: To maximize Btu delivery to engine. Flow of wells over 50 percent
        CH4 increased as needed; wells showing less than 50 percent ChU throttled.
        Gas Analysis: 49-52 percent CH4 by volume (gas entering plant is analyzed by Daniels
        automated gas chromatography system).  Managed to maximize Btu extraction.

 (PEn is now expanding the well system with the planned expansion of the energy conversion system to
 two gensets.)  As the gas  system was configured as of March 1991  it was reported to function well with
 standard well adjustment  procedures  to maximize total  Btu delivery to the engine;  these operating
 procedures resulted in a methane content reported at 49 to 52 percent with a gas flow of 980,000 cubic
 feet per day.

 5.2.3  Gas preprocessing and energy plant equipment

 A  simplified block diagram of the facility's  landfill  gas processing and energy equipment is  shown in
 figure 5. A list of gas preprocessing equipment and energy equipment is presented in table 12.  PEn has
 also made available additional information on the Otay site; an energy equipment  site plan is shown in
 appendix G and further equipment details are listed in appendix H.  (This additional information was kindly
 provided when PEn made Otay available as a tour site for the Solid Waste Association of North America
 Landfill Gas Meeting, San Diego, March 1991.)
 Landfill gas handling and preprocessing.  Gas enters the plant from the collection system at a
pressure of about -26 inches water gauge.   It  is initially cleansed of  aerosols and particulates in a
knockout tank, which is followed by a demister. Motive power for gas extraction and  its further pumping
through processing is provided by a two-stage, interceded reciprocating compressor, located  after the
demister, which raises gas from the plant  inlet  pressure to about 90 psi, at the second stage outlet

-------
                               EXHAUST TO
                             A ATMOSPHERE
POWER
TD GRID
          GENERATOR
                                                                   ~l
                                                    SENSOR
                                                    OUTPUT
                                                     COMPUTER)
                                                     ENGINE MONITORING
                                                     AND CONTROL
           COOPER-SUPERIOR
               ENGINE
                                                             SENSOR
                                                             OUTPUT
                                       COMPUTER"
                                       METHANE  FLOW
                                       DETERMINATION
                                                                     L_
                                                      ORIFICE
                                                      ASSEMBLY
LANDFILL GAS
FROM COLLECTION
   SYSTEM
KNOCKOUT
  DRUM
                               -
DEMISTER
 2 - STAGE
RECIPROCATING
 COMPRESSOR
                                                                     COALESING
                                                                     FILTER
                                        A
           CONDENSATE
                                                                    GAS
                                                                CHROMATOGRAPH
                                         Figure  5
                            Electric  Power  Facility  Based  Dn
                      Cooper-Superior  Engine  At  Dtay Landfill
                Simplified  Block  Diagram Showing  Major  Components

-------
       TABLE 12. DETAILS OF LANDFILL GAS PREPROCESSING EQUIPMENT AND ENGINE-

                               GENERATOR AT OTAY LANDFILL

 Gas handling and preprocessing

         Condensate knockout tanks: Before first stage compression, and interstage

         Demister: Model SWRT-3, fabricated by MPF, Inc.

         Compressor: Ariel two-stage reciprocating compressor; inlet -20 to -40 inches w.g.,
         outlet90tolOOpsig

         Filtration of compressed gas by King Tool model WW73T coalescing filter

 Energy Equipment

         Engine:  Cooper-Superior 16SGTA, 16 cylinder, 900 rpm, turbocharged at 85-90 psig,
         lean-bum, gross shaft power rating 1,900 kW

         Generator: Kato model A23277000 1,875 kW; 4,160 volt; 3-phase

         Substation:  Transformer stepup from 4,160 to 12,000 volts; owned by PEn
 Monitoring

         Gas flow rate by orifice meter

         Gas composition by Daniels gas chromatograph system

         Methane flow to engine computed by Kaye data computer

         Engine condition and output by appropriate sensors

         Over-all monitoring system vended by FLW, Costa Mesa, California
(suitable for carburetion into the engine).  Compressed gas at 90 psi then passes through a coalescing
fitter, and through a measuring station consisting of an orifice plate and appropriate pressure and other
sensors. The measuring station sensor outputs connect to a flow computing system, discussed below.  A
small sidestream is withdrawn periodically, conditioned, and analyzed for methane content in a gas
chromatograph, also discussed below.

Engine.  The engine is a Cooper-Superior lean-burn model 16SGTA.  Other engine characteristics are
shown in table 12.   The Superior engines were  initially selected for earlier PEn  sites because the
manufacturer,  Superior  Engine  Division  of  Afax Industries,  was  willing to  guarantee   emission
performance.   Satisfactory initial operation, spare  parts  inventory considerations, and increasing
familiarity with versions of the Superior engine led to their selection by PEn at subsequent sites including
Otay.
The engine is housed in a building with much of the auxiliary equipment (layout  shown in appendix G).
Heat dissipation is a concern with such an engine enclosure;  a large blower is used to circulate air
through the section of the building containing the engine to dissipate heat within the building and help cool
the engine.  (The Otay site gets very hot in the summertime, increasing the heat dissipation concern.)
Other features  of the engine and associated  equipment are shown in table 12 and  presented  in
appendices G and H. The principal contractor involved in installing the facility was Equipment Associates
Company (EACO). EACO packaged the genset. Installation and construction was by Modular Products,
Inc., a former PEn subsidiary.
  p irt  rtf

-------
 Monitoring and Control. A feature of interest at Otay (as well as other PEn sites) is the automated
 system that performs various monitoring and control functions.  This monitoring and control system is
 similar to those  often used at remote engine sites but has additional features specific to landfill gas
 operation.  Landfill gas composition, as was noted earlier, is monitored by an automated gas sampling
 and chromatography system (Daniels Corp), which samples and measures gas  stream component
 concentrations at predetermined intervals.  Landfill gas flow is determined based  on an orifice  plate
 system (PEn  indicates that orifice meters are preferable to turbine-type meters, which tend to foul and
 lose calibration frequently). The orifice system measures temperature, absolute pressure of the flowing
 gas, and pressure drop  across the orifice  and delivers these data to  a computer  (Kaye  Data); the
 computer uses these and the gas composition data to calculate methane flows under standard conditions.
 In addition to  giving methane ftowrate information (which with power output allows engine efficiency to be
 calculated) this sampling procedure detects changes that may indicate problems (such as oxygen in the
 gas. which could indicate line leaks).
 The system obtains  indications of the  "health" of the Cooper-Superior  engine  by  measuring several
 parameters; for example,  it measures the cylinder head temperature of each cylinder (a tow temperature
 would suggest that a cylinder was misfiring). Engine-threatening or other serious malfunctions activate an
 automated shutdown sequence.

 Data logging and processing for all of the above are performed by a minicomputer (Kaye Data), capable
 of a range of processing and logging options.  As an example of the system's capabilities, it can  be
 programmed  to provide a readout of the previous 32  hours of engine performance based on  engine
 power output  and other key operating parameters.  This monitoring ability  is one feature that allows PEn
 to operate the system with low operator labor.

 Performance/availability. Overall performance and availability have been excellent since the system's
 startup in 1986. PEn states that the engine has typically been on-line more than 90 percent of the time in
 years since startup in 1986.  The down time, or the remainder of the time, is stated to be principally for
 scheduled maintenance.  Production was 93 percent and 97 percent of full rated capacity  in 1989 and
 1990, respectively.

 The gross output of the genset, without considering parasitic loads, runs around 1,875 to 1.900 kW.  The
 parasitic toads, most notably the compressorAurbocharger at about 100 kW, but also blowers, lights, and
 other uses, reduce  output so that a net of 1.700 to 1.750 kW is exported  to the grid.  This net exported
 output still represents a heat rate  range stated by  PEn to be between 12,000 and 14,000 Btus  (higher
 heating value) of landfill gas per kWh exported.

 5.2.4  Environmental/emissions

 Source tests are conducted on the engine consistent with the requirements set by the San Diego County
 Air Pollution Control District  The results of one such test are shown  in table 13.  The emissions of the
 engine are within the limits set by the permit, also shown in table 13. A second engine would also be
 permitted at its expected emission level and is being installed.  The current air regulations do not allow a
 third engine to be installed at this time.

 5.2.5 Operation and maintenance
 PEn's automated  system for monitoring and controlling the engine and other key parameters (e.g., gas
 flow, composition) typically allows the plant to be operated with one operator for a standard work week of
 40 hours.  The operators duties  also include monitoring and adjusting the gas field.  Additional staff
 support may also be given as needed.
 Maintenance items for the  engine include weekly monitoring of oil for contaminants. The gas compressor
 is  inspected every 6 months.  Oil is changed approximately every 2,000 engine operating hours, a task
that  takes about 4 hours.  Engine overhauls, consisting of upper and tower end,  are  performed

-------
   TABLE 13.  RESULTS OF SOURCE TEST ON COOPER-SUPERIOR ENGINE AT OTAY LANDFILL

 Tests conducted by volatile organic compound testing, San Diego, California, October 20 to 27,1987.
 Standard operating conditions, full load. Stack gas flow 5,680 scfm.  Several runs averaged.
 For reference: Exhaust O2 - 6.8 percent by volume, CO2 -13.4 percent by volume
        Component           Concentration in exhaust gas, ppm

        NOx                        370

        CO                         448

 Non-Methane Hydrocarbons: 0.0769 to/bhp.hr

 Allowable engine emissions limits, Otay landfill:
        Component           One engine           Two enoines
        NOx, Ib/yr              93,195               179,887
        CO, Ib/yr              154,413               288,306
        NMOC, Ib/yr            39.925                79,850

 approximately every 8.000 hours.   Other significant plant maintenance  items  are  gas compressor
 maintenance once per year, and various degrees of engine servicing at 500,1.000. and 5,000 hours, and
 annually.

 5.2.6  Revenue and cost Hems
 Economic data made available for the Otay facility are summarized in table 14. The power sale contract
 (under terms of a variant of the California Public Utility Commission's Interim Standard Offer Number 4)
 with SDG&E is favorable.  Although power sale payments actually vary with time and other factors, the
 contract's features are such that when all utility payments are considered, the averaged per-kilowatt hour
 price paid for a continuous, constant power stream sold to SDG&E would  be about $0.09 cents per kWh.
 This energy revenue includes capacity payments that are received by PEn in addition to the per kWh
 payments (note  that these contract  terms were finalized in the  mid-1980s and contracts  available
 currently would be less favorable).  Thus, with  power production typically over 90 percent of full-rated
 capacity, the Otay facility revenue at an output of 1,700+ kW is high. Gross electric power sale revenues
 in 1989 and 1990 were $1.2 million and $13 million, respectively. This revenue is distributed to several
 participants; its allocation is not available but is distributed to royalty recipients, as well as PEn.

5.2.7  Discussion

Performance effects attributable to landfill gas.  Engine power output is somewhat reduced compared
to nameplate rating or pipeline natural gas. The compression of landfill gas from atmospheric pressure to
the carburetton pressure  of the lean-bum turbocharged engine (an energy demand not present with
pipeline gas) is a parasitic load probably reducing the net efficiency of the genset by several percentage
points.
Regarding engine  life and wear. PEn maintenance precautions involving frequent oil  checks, other
monitoring, other engine maintenance, and engine overhauls every 8,000 hours appear to prevent any
landfill-gas-contaminant problems from becoming severe.
  PJG  G640101A AOW

-------
          TABLE 14. REVENUE AND OTHER ECONOMIC DATA: OTAY ENERGY FACILITY

  Averaged payments per kWh, 1990: $0.09

  Total capacity payments, 1990: $240,000
  Total gross electric revenue, 1990: $1.3 million

  Averaged payments per kWh, 1989: $0.089

  Total capacity payments, 1989: $240,000

  Total gross electric revenue, 1989: $1.2 million

  Gas system capital investment (excluding energy plant): $300,000

  Estimated capital investment for energy equipment: Not available (confidential)


  Lessons (earned and other comments.  PEn did not identify any issues that could be categorized as
  "lessons learned" from its Otay site. This is not unexpected since lessons learned from PEn's operation
  at other sites were presumably applied at Otay to forestall problems.  PEn staff did point out, however,
  that emission standards changes, including those occurring "after the fact" of permitting and start-up, are
  posing serious uncertainties and cost impediments to projects such as Otay; such costs must be borne by
  cogenerators like PEn since there are no means for passing them through to power purchasers.
  Plans. Because landfill gas is available and the permit allows for it, PEn is installing a second genset at
 Otay. (Note added as of September 1991: the installation has now been completed.) It would consider a
 third, H gas proved available and the permit could be modified to allow it.

 Summary.  PEn is a significant operator of landfill-gas-fueled electrical generating facilities.   It has
 developed site  selection criteria and operational practices  that appear to  serve  well.   Economic
 performance appears to have been good.

 5.3 Electric Power Generation Using Waukesha Engines at the Marina Landfill

 5.3.1  Introduction and general overview

 The Marina Landfill is on Del Monte Road 1 mile south of California State Highway 1 in Marina, California.
 The facility at the site employs two Waukesha-engine-powered gensets for electric power generation and
 sale to the  Pacific Gas and Electric Company (PG&E) grid.  The  gensets  generate a net total of
 approximately 1,150 kW for export to PG&E  A photograph of the trailers housing the gensets is shown in
 figure 6.

 With initial genset startup in 1983, this was one of the first landfill gas-to-energy projects to operate In the
 United States.  General information on the site is summarized in table 15. The initial capital investment in
the system, exclusive of the extraction system was about $1.3 million in 1983 dollars.  Gross revenue
from electric power sales within the past few years, including capacity payments, has typically been about
$360,000 per year.

Current  operating arrangements  are also indicated  in table 15.   The Monterey Regional  Waste
Management District (MRWMD) owns and operates the engines, receiving the profit (or  any potential
toss) from engine operation.  The Monterey Landfill Gas Corporation  (MLGC) operates the gas system,
  p irz  r5

-------
Figures
Marina Landf HI
                                                    . Each trailer

                                                                                              bed.

-------
                 TABLE 15. ELECTRIC GENERATION AT THE MARINA LANDFILL
 Site: Marina, Monterey County, California
 Nature of application: Electric power generation and sale to grid.
 Energy equipment: Engine-generator sets powered by Waukesha Engines, system designed by
 Perennial Energy

 Owner and operator of Energy Equipment: Monterey Regional Waste Management District

 Startup dates of gensets: December 1983 (first) and February 1984 (second)

 Landfill Owner: Monterey Regional Waste Management District
 Current tonnage in landfill: 4 million tons in early 1991
 Rll rate:  850 tons/day.

 Gas collection system: Designed by EMCON; owned by and operation/monitoring by Monterey Landfill
 Gas Corporation (MLGC), a subsidiary of EMCON Associates


 with additional gas  system operating  assistance being provided by MRWMD staff.  The  MRWMD's
 benefits come from  power revenue, landfill gas collection, and consequent emission abatement. The
 MLGC's benefits come from a royalty on net power sales of $0.00667 per kWh and tax credits on the
 delivered gas.

 5.3.2 History of project

 Two factors were particularly helpful in initiating this project. The MRWMD directors and staff were aware
 early that landfill gas represented a potential source of energy and revenue for the district.  EMCON
 Associates  (EMCON), the districts consultant, also had early involvement and background in landfill gas
 energy issues.  A complete project history is available because of the principals' documentation of the
project in the technical literature.  Two references (Myers, 1987, and Van Heuit and Pacey, 1986) present
the MRWMD and EMCON's perspective on details of the project's implementation and subsequent
experience to 1987. The major steps in the implementation of the project included the following.

Initial steps:

     1. An initial  feasibility study was commissioned  by the  MRWMD  and carried out by
       EMCON in 1981. This study (in conjunction with gas extraction tests discussed next)
       showed that landfill gas energy recovery was likely to be feasible and profitable. This
       study was supported by the MRWMD (67 percent) and PG&E (33 percent). The PG&E
       utility was interested at the time in augmenting electric generating capacity in its
       service area (whether by itself or through independent suppliers).

    2. Gas extraction tests were conducted,  the major ones being a two-well test that had
       been conducted in 1977 (preceding the study discussed above) and another two-wen
       test completed between September 9 and October 16,1981. These tests, as well as
       the projections of a gas generation model  (see Van Heuit, 1987; similar to models
       discussed in EMCON, 1982) indicated  that sufficient gas was available to allow
       economic electric  power  generation.   All extraction  tests  and gas generation
       projections were performed by EMCON.
    3. EMCON suggested—with concurrence from PG&E—that using the gas to fuel electric
       power generation for sale to PG&E was the best alternative.
                anw

-------
 (Note: The  further negotiating steps,  with  engine suppliers,  exemplify  complexities that  can  be
 encountered in attempts to implement an energy system.  The brief summaries presented below that
 suggest their complexity, and additional detail can be found in Myers, 1987.)

      4.  Negotiations for an energy conversion system proceeded initially with Engine Power
         Company  of Stockton, a large, well-established, and experienced vendor of engine-
         generator  sets.   Engine  Power considered including financing with the complete
         package.  In 1982, however, Engine Power elected to terminate negotiation due to
         financing considerations.

      5.  American  Mobile Power was the next  potential vendor of  a complete package.  It
         obtained an Authority to Construct from the local air quality district, and a power sales
         contract from  PG&E during  this negotiation.  American  Mobile Power could  not,
         however, obtain the required financing. It terminated negotiations shortly thereafter.

      6.  The next step, undertaken to reconfirm the basis for the project and reassure potential
         participants,  including those providing project financing, was  a longer term gas test
         performed by EMCON  in 1983, with sixteen 50-foot-deep wells to fuel  a portable
         engine. These tests again showed the availability of adequate gas.

      7.  Proposals  to the MRWMD were concurrently considered for energy packages  and
         financing, which were made by Cambrian Energy Systems (Pacific Lighting) and Gas
         Recovery  Systems (Genstar).  A  proposal  including financing was also made by
         Palmer Capital (Palmer).

      8.  After extended negotiation, Palmer was selected as a partner.  Perennial Energy, now
         of West Plains, Missouri, also offered the package judged best, to design, install, and
         maintain two trailer-mounted gensets powered by Waukesha 12-cylinder. 7,040 cubic-
         inch engines, for an initial cost of $1,300,000.

      9.  Financing for the energy facility was arranged by Palmer, in part through the formation
         by individual investors of  the Marina Landfill Gas Corporation (MLGC), and in  part
         through a loan from the  Bank of New England. The MRWMD leased the gas rights to
         MLGC in exchange for royalties of at least 12.5 percent of gross power sales to PG&E.

    10.  Further emission-related issues were resolved in order to obtain  a permit to operate
         from the Monterey Bay Unified Air Pollution Control District.

 Steps 1 through 10 resulted in the installation and operation of the first genset in December 1983, and the
 second in February 1984.  The  installation can  be  considered the result of persistence by technically
 aware participants (though H cannot be said to be the result of experience, since no one had experience
 at that time).

 Further occurrences after startup are of historical Interest, and will be  referred to in the later economic
 discussion:

    11. In 1986, largely due to a decline in PG&E power payments, but also because of tax law
        changes, Palmer Capital donated Its stock  and sold the gensets to the MRWMD for
        $500,000.  MLGC retained ownership of the gas and gas system  (through 2001). As
        owner of the gensets and PG&E power-sales  contract, the MRWMD now receives
        revenue from the sale  of electricity: royalties are paid "to  MLGC.  As a further
        informational note to the sequence of steps above,  MLGC was purchased by EMCON
        in 1988 (for $200,000).

5.3.3   Landfill and  landfill gas extraction system

Details of the landfill and landfill gas system are given in table 16. The Marina Landfill is a large landfill,
termed an "area fill"  type by the MRWMD (it could also be termed a cut and fill), in operation since 1966.
  PIR

-------
 It had received about 4 million tons of predominantly residential municipal waste by early 1991.  The
 depth of fill in areas from which gas is extracted ranges up to 90 feet.

             TABLE 16. LANDFILL AND GAS SYSTEM CHARACTERISTICS: MARINA

 Landfill
      Location:  North of Marina,  in Monterey County, California; on Del Monte Road, 1 mile
      south of California Highway 1
      Type: Area Fill
      Date Opened:  1966
      Waste in Place: 4 million tons
      Waste Fill Rate: 260,000 tons per year
      Total Fill Area: 490 acres
      Area Now Filled: 90 acres
      Climate: Mediterranean
      Annual Rainfall: 11 inches
      Daily Cover Soil: Sand/silt
      Intermediate Cover Soil: Sand/silt
      Rnal Cover Soil: Sand/silt with 1 foot of clay
Gas Extraction System
      Type: Module 1 - vertical wells. Module 2 - horizontal trenches
      Number Active Collection Units:  Module 1-12 vertical wells; Module 2 - 7 horizontal
      trenches, Module 3 - none
      Collection Unit Piping: PVC
      Lateral/Main Header Pipe Material: PVC, aboveground
      Collection System Details:
                Vertical wells:  18-inch diameter, 40-50 feet deep, permeable material and
                slotted pipe below 20 feet, bentonite seal at top of permeable material and at
                surface
                Horizontal  trenches:  2 feet deep  by 3 feet wide  backfilled with  11/2 inch
                gravel, embedding 6 inches PVC solid pipe, no seal at Joint (gas enters loose
                Joint), 6-ounce geotextile cap over gravel.
           •    Pipe slope  at minimum of 2 percent
     Current Collection Rate: 580 cfm (LFG), or 850,000 cfd (LFG)
     Adjustment Protocol: Keep methane concentration at 55 percent + since only  about half
     of estimated gas availability is extracted.
     Gas Analysis: Methane analysis by portable thermal conductivity based gas analyzer

-------
 The initially installed portion of the landfill gas system consists of 16 vertical extraction wells (first used for
 tests as described in Van Heuit and Pacey, 1987).  Horizontal trenches have been installed subsequently
 as newer areas are constructed. The MRWMD has installed seven horizontal trenches in Module 2 and
 two horizontal trenches in the lower portion of Module 3.  The extraction well system is maintained by
 MLGC, with assistance from the MRWMD.
 The Marina landfill generates methane at a rate in excess of genset needs.  Extant wells and connected
 horizontal trenches could provide significantly more gas than is required for the engines; in general, the
 field  functions  well, with few adjustments.   Some wells  are  ten wide open; wells yielding less than
 50 percent methane, as occurs occasionally, are throttled back.  The few other adjustments include
 periodic replacement of flex hoses and resloping  of aboveground gas lines so that condensate drains
 properly.  Condensate accumulation problems have occurred from time to time, and further condensate
 traps are being installed in response to needs.

 5.3.4  Gas preprocessing and energy plant equipment

 A simplified block diagram for the energy facility is shown in figure 7. Major gas preprocessing equipment
 and energy equipment items are listed in table 17.
 Landfill gas handling and preprocessing.  The features of the gas collection system were noted above.
 The equipment for landfill gas  handling and preprocessing at Marina consists  solely of a fiber filter
 medium (size cutoff not available) in a small housing, and two small Hauck blowers, one for each engine.
 The blowers and filter were engineered  by Perennial Energy. This is considered very limited processing,
 based on practices elsewhere.
 Engines. Each of the two gensets is powered by a Waukesha  model L7042GU 12-cylinder engine. The
 noteworthy feature of this engine model is that it is naturally aspirated. As discussed in section 3, this
 means that the engine is carbureted at a near stoichiometric fuel-to-air ratio (the mix can be very slightly
 fuel rich) and that the fuel-air mix enters engine cylinders at near atmospheric pressure. This contrasts
 with the use  of lean-bum engines, which are  turbocharged, at most other U.S. sites where landfill gas is
 used to power 1C engines. Further characteristics of the engines are shown in table 17.
 The gensets  are housed in two trailers, as originally designed by Perennial Energy. The trailer roofs were
 designed to  be removable for maintenance. The  trailers were originally mounted on railroad ties,  but
 these were replaced in 1985 with a steel frame after vibration and settlement problems attributable to the
 railroad tie mounting occurred.

 A catalytic converter, mounted on the outside  of the trailer, is used to reduce NOX, CO, and NMOCs in the
 engine exhaust. This catalyst (performance is discussed later), is a 3-way type very similar to that used
 for automotive exhaust purification.  After trials with various forms of catalyst, the MRWMD has settled on
 a Riley-Beard catalyst on a bead-type support.

 Performance/availability Issues.  Over-all performance and availability have been good since the first
genset was installed in 1983. The MRWMD  states that an average availability of more than 80 percent
was obtained for the first 3 years of operation (Myers, 1987). One way in which the genset service factor
may be calculated is to divide the actual yearly power output sold to PG&E by the number of kilowatts
that could potentially be obtained at 1,150 kW with no downtime in a full year. Service factors calculated
on this basis  (for this report) from yearly kilowatt totals were 81 percent in 1987,89 percent in 1988, and
82 percent in 1989 (the service factors might be slightly different if calculated on run time). The  MRWMD
 has calculated a service factor, based on run time, of 80.4 percent for 1990. The most serious outages
were a bearing failure in 1985, believed to be caused by the inadequacies of the railroad tie supports for
the genset trailers, and an outage in 1990, not related to any fundamental genset problem in 1990, due to
a supplier shipment of the wrong  maintenance replacement parts.
  PJG G640101A.AOW

-------
 POWER
 TO
 GRID
GENERATOR
                                   CA1ALYTIC
                                   CONVERTER
                                               EXHAUST
                                               TO
                                               ATMOSPHERE
VAUKESHA
ENGINECS)
        LANDFH L
        GAS FKJM
        COLLECTION
        SYSTEM
                                             BLOWER
                    CONDENSATE
                         Figure  7
          Electric Facility  At Marina Landfill
Simplified Block  Diagram  Showing Major  Components

-------
       TABLE 17.  DETAILS OF LANDFILL GAS PREPROCESSING EQUIPMENT AND ENGINE-

                           GENERATOR SETS AT MARINA LANDFILL


 Gas Preprocessing

        Blowers: Two Hauck, 4 hp, model TBA-16-3-T-1 (one per engine)

        Custom filter unit: Cartridges in 2-foot diameter by 4-foot high housing; designed by Perennial
        Energy, West Plains, Missouri

 Energy Equipment

         Engines:  Waukesha L7042 GU engines, naturally aspirated

         Generators:  Reliance model VHP 7100G.  Approximate maximum output 650 kW,
         normal output range 560 to 600 kW

       Engine operation and maintenance data:

              • Oil used is Mobil  Pegasus 446 high alkalinity, 850 hours between changes

              • Maintained 1983-88 by outside contractors, 1988 on by MRWMD
              • Catalyst system:  Riley-Beard catalyst. Catalyst in annular bed between inner
                and  out cylinders; 4 inch  catalyst  bed  depth,  area of  catalyst bed
                approximately 12 square feet
 Other than bearing failure and spare parts problems, the 15 to 20 percent downtime has been for routine
 maintenance and a variety of other causes worth noting briefly. The engines have tended to overheat
 when ambient temperatures are over 70*F and winds  are blowing from east to west (counter to the
 prevailing wind direction, which means the radiator is on the lee side).  Some fatigue-related engine
 problems are said by Marina staff to be developing. The closeness of a hot exhaust pipe to the cylinder
 head was at one point a source of problems, as was the noted original mounting of the trailer enclosures
 on support beds of railroad ties.  Some of the problems, as well as repair difficulties, appear to be the
 result of the deliberate decision to save money on the genset design.  Given the reasonable on-line
 performance to date, however, it is not clear  that spending more  money initially on the gensets would
 have been highly cost effective.
 Fuel efficiency. The calculation of engine fuel efficiency at Marina presents some uncertainties. (With a
 more than adequate gas supply—and a facility that is generator limited—there is currently no incentive to
 maximize, or even closely determine, the fuel efficiency of the engines, which are running at less than
their greatest possible output.)  One uncertainty that can be mentioned is just how much fuel is actually
entering the cylinder on each stroke. Waukesha expects that the heat rate of this particular engine on
pipeline natural gas at full power would be near 10,745 Btu/kWh shaft power6.  It can only be said that, by
various  indicators (which are approximate),  the Marina engines' fuel use would appear to  be very
substantially higher, when expressed as Btu/kWh sold to PG&E. This would in part reflect the expected
generator inefficiency in converting engine shaft power to electric power.
Catalyst.  Catalyst We, even with frequent dust removal  and washing, has, until recently been short,
about 3 months;  catalyst replacement • has  therefore  represented a  significant  expense.   Catalyst
6  Ptnoral communication, Water PonM, Wautosha Engine Division, Wauta ha. Wl. June 1M1.
  PJG G640101A.AOW

-------
  problems are considered to be landfill-gas specific, and generally due to attack from small quantities of
  HCI and HF formed during combustion (section 2).  Recent changes to a higher alkalinity engine oil
  appear to be substantially  increasing catalyst life.   One additional problem identified by the operator is
  that under certain operating conditions, the catalyst temperature can increase, inactivating the catalyst
  (apparently  by sintering).   The operator  states that, with the existing catalyst temperature sensing
  arrangement, damage appears to be done by the time the temperature rise is noted.
  Specifics of catalyst performance in reducing emissions are presented next.

  5.3.5  Environmental/emissions

  The genset engines are emission tested consistent with requirements set by the Monterey Bay Unified Air
  Pollution Control District.  Available results from three exhaust emissions tests are shown in table 18;
  these test results illustrate aspects of catalyst performance.

  The emissions of an engine with an exhaust catalyst are a function of (1) the functional ability of the
  catalyst to reduce  NOX and oxidize other  exhaust  gas components and (2) the operating parameters,
  particularly carburetion, of the engine.  Ideally, the engine carburetion will be close to stoichtometric, with
  just  enough  air to bum the fuel.  The catalyst will cause the reducing gases (CO and NMHCs) in the
  exhaust to reduce  NOX to  N2, leading to substantial  reduction of the reducing gases and NOX in the
  exhaust gas.  The  emission performance of the  engine in  this (rather ideal) case can be good; without
  going into detail, note that  the results  (shown in table 18) of the first engine test (September 12,1989)
  show pollutant emissions below any existing California or U.S. standards. On the other hand, deviation of
 the air/fuel mix from stotehtometric can lead to  formation  of more  NOX than can be reduced or more
 reducing compounds than can be oxidized; any  of these conditions, or catalyst inactivation (which has
            TABLE 18.  SUMMARY RESULTS: EMISSIONS TESTS ON MARINA ENGINES

 (Output at 560 kW, average of three 1-hour tests for each date shown)

                      Exhaust component ppmv      GnV           Measured     Permitted
                      (as emitted)                  bhphr         to/hr          Ib/hr1

 September 12.1989. engine M2

 NOx                                 10            0.04           0.07          3.12

 CO                                 78            0.21           0.34          11.45

 TNMHC                              <10           <0.01          0.02          3.12

 September 20.1990. engine M2

 NOx                                 2.5            0.01           0.02          3.12

 CO                                  518           0.6            2.52          11.45

TNMHC                              <10           <0.01          <0.01         3.12

October 20.1990. engine M1
NOx
CO
TNMHC
25
2211
0.02
0.13
7.31
0.01
0.22
12.10
0.02
3.12
11.45
3.12
1.  Assumed as half of total permitted emission limits for two engines operating simultaneously
  PJG  GR40101A AOW

-------
 been  a major problem at Marina), can cause the emissions to rise to unacceptable  levels.  This is
 illustrated by the last test of engine M1 on October 20,1990, which shows elevated CO levels that might
 be due to an overly fuel-rich carburetion condition. (Note that only one tested emission level in table 18
 can be considered to exceed permit condition, and that only slightly: October 20,1990, for CO.)
 As engine loads increase, at generator outputs above 600 kW, tests have also shown (detail omitted) that
 emission levels  tend to increase significantly, even with the catalyst.  Thus emissions have sometimes
 been limiting facility electric output; the degree of limitation will decrease if catalyst performance can be
 improved.  The permit to operate currently limits each generator's output to 640 kW.

 5.3.6  Economics

 As a preface to a discussion of economics, some background on ownership should be noted.   At the
 original purchase price of $1.3 million and with initial financial arrangements, MLGC's break-even level for
 power sale to PG&E was about 4 cents per kWh (total of all utility payments including those for capacity,
 averaged per kWh).   The power sale contract  (which had, among other  features, a variable price
 component relating to the purchase price PG&E must pay for oil/gas fuel) was such that power purchase
 prices could and did fall below this in 1986. The system was at that point transferred to the MRWMD for
 $500,000 (Myers, 1987). With this transition, the arrangement changed from one in which the MRWMD
 received a royalty of 12.5 percent on gross power sales, with minimal risk, to one in which the MRWMO
 operated the system and bore the entire responsibility for profit and loss.  The power sale royalties to the
 MRWMD, by years before the sale, were $33,084 in 1983 to 1984; $93,989 in 1984 to 1985; and $44,672
 in 1986. The revenues beginning in 1987 (which are best expressed as net of various expenses, and with
 qualifiers), after the sale, are discussed below.

 Revenues from sale of electric power to PG&E consist of payments that vary on a price schedule by time
 of day for kilowatt hours delivered, and also a capacity payment with this particular contract (the capacity
 payment reflecting, in essence, savings relating to generating capacity the utility does not need to build).
 Appendix I shows a typical schedule of sale prices per kilowatt hour for specified time periods, ranging
 from $0.028 to $0.034 per kilowatt hour in mid-1990.  One feature of the contract to note is that  PG&E
 may elect not to  buy power for up to 600 hours within any given year.  The MRWMD continues, however,
 to operate the engines and provides power to the PG&E grid, because of the environmental benefits at
 Marina, even when PG&E elects not to pay.  The capacity payment, which reflects the higher value of
 generated power in meeting needs at times of high demand, is important and normally provides  a large
 portion (about 35 percent) of the total gross electric revenue; it amounts to additional  revenue in the
 range  of $0.015/kWh.  Capacity payments (by calendar year) at Marina were $138,000; $140,000;
 $130,000; and $13,700 in 1987 through 1990.

 A problem with  maintenance spare parts and down time in 1990 caused most of the 1990 capacity
 payment to be  deferred until certain probationary,  conditions  imposed  by  PG&E were  met; these
 conditions were  in fact met and the 1990 capacity payment was collected in 1991  (in addition to the
 normal 1991 capacity payment that was earned in 1991).

 Table 19, derived from figures provided  by  Marina, shows gross electric revenues and operating
 expenses for the three Marina fiscal years beginning In the year July 1,1987, to June 30,1988. (1990 to
 1991 figures are  not available; the 1990 to 1991 revenue would be low as noted  because of the deferral
of capacity payment; this is not a permanent problem). The operating expenses  include factors such as
operating labor, maintenance, and royalties, but exclude capital-related charges such as interest on debt
and depreciation. The table does not include  a one-time tax payment of $82,000 that was peculiar to
Marina's  circumstances and would not be a normal expense.  The operating revenue for the MRWMD is
calculated in table 19 as the difference between the gross revenue and operating expenses.  The average
operating revenue, as defined above for the three typical MRWMD fiscal years  1987 to 1988,1988 to
1989, and 1989 to 1990, has been near $166,000 per year. It is very important to note that this operating
revenue  specifically excludes the debits  that would be due to financing charges,  and depreciation
necessary to reflect the eventual need for equipment replacement.
  PJG G640101A.AOW
                                              A-l

-------
   TABLE 19. ECONOMIC DATA FOR MARINA LANDFILL GAS ELECTRIC GENERATION FACILITY

 Initial capital cost of facility (1983): $1,300,000

 Purchase price paid for facility by MRWMD in 1986: $500,000

 Typical" per kWh price schedule for power sale: See appendix I

 Calculation of operating revenue (see text) by year of operation:
Year
Gross revenue
Less:
GASCO royalties
Repairs, maintenance
Salaries/fringes
Misc outlays
Net Operating Income
1987-88
$369,328

$56,125
$126,909
$6,000
$4.081
$176,213
1988-89
$360,825

$55,349
$85,672
$36,000
$13.407
$170,468
1989-90
$360,927

$50,755
$87,080
$45,000
$25.265
$152,827
 MRWMD has paid off all capital costs with revenues, and now owns the system free and clear.  It
 receives the benefit of landfill methane emission abatement in those areas where gas is being extracted.
 While the benefits are obvious and the MRWMD nets income, its capital cost has been well below the
 typical capital cost for similar equipment.  Revenues would need to be higher than at Marina to assure
 acceptable economics if the equipment cost were more typical. Some further discussion of economic
 issues is presented in 5.3.8.

 5.3.7  Operation and maintenance
 Supply  and other costs were  listed above.  The  naturally aspirated engines can operate with only
 moderate attention. Operation and maintenance labor-hours are estimated at about 40 hours per week.
 These labor needs actually vary, given that a team of maintenance workers may be needed on occasion,
 while at other times very little operator attention  may be needed.  Parts cited as routine maintenance
 needs are head gaskets and cylinder heads. Marina staff rebuild the cylinder heads on site.

 5.3.8 Discussion
 Performance effects attributable to landfill gas. The impact of using landfill gas on the performance of
 the system, compared to what might be expected with the same system's performance on natural gas,
 seems minor.  The Waukesha  L7042GU  engines would be expected to produce  1,173 horsepower, or
 875 kW on pipeline gas.7  Even allowing for an engine shaft power toss of 10 percent, due to dilution by
 C02, maximum engine shaft power output on landfill gas could still be expected to be about 790 kW.  The
 generators however limit each gensefs output to 600 kW, so COa dilution is not the limiting factor on
 power.
 Given the problems encountered at other sites, and the very limited gas preprocessing at Marina, the
 absence of engine problems attributable to landfill gas contaminants at  Marina over an 8-year period is
 notable.   None  of the  problems mentioned  earlier with the engines/gensets  relate specifically  to
contaminants.  The Waukesha factory representative indicates that operation and maintenance of the
   Personal communication. Waltor PonM, WaukMha Engint Division. Waukasha, Wl. June 1901
  o ir; r5(

-------
 engines should be close to identical at their somewhat reduced load compared to full toad operation,
 other things being equal7.   It can be speculated that  the lack of  problems could be attributable to
 cleanliness of gas at the Marina she, or possibly some feature of stoichiometric-bum naturally aspirated
 engines that renders them less susceptible to landfill-gas-contaminant  related problems.
 Catalyst performance Issues.  Catalysts' performance has in general been poor when they have been
 used with landfill gas fueled stotehtometric bum 1C engines in the past (Jansen, 1986). Low levels of HCI
 and  HF combustion products typically attack catalysts and support, causing malfunction.  This was the
 case until recently  at Marina, as the catalyst bed had to be cleaned about once each month, and the
 catalyst had an extremely short service life (very rapid breakdown) versus that with normal natural gas
 applications. The adoption of a high-alkalinity oil whose ash is reported to coat the catalyst appears to be
 benefitting catalyst life (as  might be expected chemically).  As of the site visit, the most recent batch of
 catalyst had been performing well, with only  limited  dust removal, for  more than  7 months.   This
 performance, if sustainable,  would reduce catalyst related costs and  help  make  stofchiometric  bum
 approaches such as are used at Marina more attractive.
 As a summary comment on the potential of catalysts, the Marina results suggest promise for their use in
 reducing emissions of naturally aspirated stoichiometric bum engines.  Their successful application would
 enable greater use of these naturally aspirated engines with their attendant operating simplicity. As seen
 at Marina, however, the various problems with catalyst attack, mixture control, and other areas are not yet
 completely solved.

 Economic Issues.  As noted in 5.3.6 the  Marina facility generates a positive cash flow, but It was
 acquired by the MRWMD for $500,000, a capital cost that was about 40 percent of the initial market cost.
 By way of comparison, costs of a brand-new .facility with characteristics similar to the Marina facility can
 be roughly estimated to be between $1.5 and $2.5 million, or roughly $1,000 to 2,000/kW (excluding gas
 extraction). Depending on depreciation figures and financing costs (which are to some extent a matter of
 judgement), a  new facility  in this cost  range would be  losing  a moderate amount of money by selling
 power to the grid with the actual power sale arrangement. The basic, overall  import is that Marina, with
 its existing revenue structure, would not be implemented today because of economics. Facility expansion
 is precluded by economics and also emission constraints although the  gas is available.
 Lessons learned and other observations.  Marina staff note that access to the current trailer is difficult
 for certain types of repair and maintenance. The lack of "as-built" drawings has also posed a problem in
 some areas, notably generator repair.  Relating to overheating problems,  Marina staff have suggested
 that these could have been  reduced M roof-mounted radiators had been used.

 Plans. With recent improvements in catalyst performance, a third engine installation might be  permitted
 by the Air Pollution Control  District; the gas is available and the MRWMD would attempt to install a third
 engine if it could obtain a satisfactory power sale agreement.  PG&E now has  a surplus of generating
 capacity, however,  as  well as low-cost power  being vended to its grid. The chances of obtaining an
 agreement providing satisfactorily high power revenue in the near term appear small. (The PG&E utility
 does, however, anticipate a need for additional capacity later in the 1990s,)

 5.4 Electric Power Generation Using  Gas Turbines at Sycamore Canyon Landfill
                                                             4
 5.4.1   Introduction and general overview

 Sycamore Canyon landfill is located near San Diego, California.  The facility at this site uses  two Solar
 Saturn recuperated gas turbines to generate a total of slightly more than 1,300 kW (net) for export sale to
the San Diego Gas and Electric grid.   As of  the site visit (March  1991) the facility was owned and
operated by Solar Turbines  (Solar). A photograph of the building housing the turbine generators is shown
as figure 8.
  PJG G640101A.AOW

-------
Figure 8      Sycamore Canyon Electrical Generation FadMy: Building Houses two solar gas turbines, and
             associated generators.

-------
 General site information is summarized in table 20.  The turbine generating system has been operating
 since 1989.  Solar states that capital investment for this system was about $4 million; gross revenues
 from electric sales  are currently  running  at  about $650,000  per year.  Solar operates and has
 maintenance and profit-and-toss responsibility for the generating plant.  Solar also operates the landfill
 gas system. San Diego County has overall responsibility for operation of the landfill.

 Further specifications and details on the energy application and operations at this site follow, beginning
 with the history of implementation.

 5.4.2  History of system Implementation

 Solar staff indicated that motivating forces to embark on this project included (1) an acceptable projected
 return (2) a desire to sell Solar equipment (3) a desire to further expand their operating experience base
 on landfill gas (4) ample gas supply projected based on the tonnage of waste in place, and expected at
 closure, and (5) the project's contract to sell power at a favorable rate to the local utility under California's
 Standard Offer number 4.  The convenience of the site's location to Solar's manufacturing facility in San
 Diego also appears to have played a part in the decision.

 Solar was able to negotiate mutually  agreeable terms with the owner of the landfill, San Diego County.
 The County was willing to have the energy system installed under terms where Solar operated the energy
 system, was responsible for maintenance of the gas collection system, and the operator and the County
 were provided a royalty from electrical sales of approximately 8 percent of net.

 5.4.3  Landfill and landfill gas system

 Details of the landfill and landfill gas system are given in table 21.  The  initial landfill gas system was
 designed and installed by GSF  Energy.  Current vertical well pipe is carbon steel, rather than the usual
 plastic; steel well pipe was selected based on its ability to better withstand  compressive and shear forces
 from waste subsidence in this deep landfill. Wells are equipped with zinc anodes for corrosion protection.
 Collection well laterals are  both below and  aboveground, and the main header is aboveground.  Solar
 states the length of the collection well lateral piping is  about equally divided between above and below
 ground piping.
 The 9 million tons of waste in place are expected to generate methane at a rate exceeding the gas needs
 for the two turbines operating at  full power (which would together be expected to consume about
 450,000 scf of methane per day).  Despite  cover soil that is reportedly relatively porous,  standard well
 adjustment procedures produce an acceptable gas  supply for the facility.  The system has experienced


  TABLE 20.  GENERAL INFORMATION: SYCAMORE CANYON LANDFILL GAS ENERGY FACILITY

Location:  15 miles northeast of the City of San Diego, in San Diego County, California

General description of energy application: Electric power generation, sale to utility  grid

Generating plant: Based on two Solar Saturn recuperated gas turbines, nameplate rated at 933 kW each,
with other standard Solar components

Startup date:  Early 1989
Owner and operator of energy equipment: Solar Turbines

Landfill owner and overall operator  San Diego County

Current and projected tonnage in place: 9 million tons In 1991,30 million tons at closure in 1998

Landfill gas collection system: Vertical well, operated by Landfill Energy Partners	
  PJG G640101A.AOW

-------
         TABLE 21. SYCAMORE CANYON LANDFILL AND GAS SYSTEM CHARACTERISTICS

  Landfill
          Location of landfill: Mission Gorge Road, San Diego County
          Type of landfill: Municipal waste, largely canyon fill
          Date opened:  1962
          Tonnage in place (earty 1991): Approximately 9 million
          Scheduled tonnage at closure: 30 million in 1998
          Climate: Semi-arid, rainfall about 10 inches per year
          Cover soil material: "porous," permeability not stated
          Acres/Acres filled: 530/390
  Gas System Characteristics
          Designed and installed by:  GSF Energy
          Operated and monitored by: Landfill Energy
          Number of vertical wells: 50
          Depth of wells: Approximately 80 feet (variable)
         Depth of permeable zones in wells: Bottom third to two thirds
         Current gas collection rate:  12. million cubic feet of landfill gas per day
         Gas analysis: Three times weekly by gas chromatograph for methane
         Procedure for well adjustment: Wells below 50 percent methane, throttled; flow rate of
         those above 50 percent, increased as appropriate.
 few problems from "overdrawing"  (air infiltration through the surface associated with a high rate of
 extraction),  although it has had some problems associated with piping  leaks.  Leaks can  result in
 problems caused by gas being diluted with air. To forestall such problems, an oxygen sensor at the plant
 triggers an alarm when the oxygen concentration exceeds  1.8 percent, and a system shutdown when
 oxygen concentration exceeds 3.6 percent
 5.4.4  Plant equipment: Gas preprocessing and energy
 A simplified schematic of the energy equipment is shown in figure 9.  Gas preprocessing equipment and
 energy equipment characteristics are shown in table 22.
 Landfill gas handling and preprocessing. The features of the gas collection system were noted above.
 The equipment for further landfill gas handling and preprocessing within the plant was engineered by
 Solar.  Gas  enters the plant through the gas system main header.  A vacuum of 2 inches  mercury, or
 about 25 to 30 inches water column, is typically maintained at the point where the main header enters the
 plant.  Vacuum for gas extraction from the landfill, and motive  power for initial  pumping of landfill gas
within the plant, is provided by an oil-flooded screw compressor within the plant (see flow schematic and
table 22). Immediately on entering the plant, and  before the  compressor, this raw gas passes through a
  PJG  GW0101A Anw

-------
      TABLE 22. GAS PREPROCESSING AND ENERGY EQUIPMENT AT SYCAMORE CANYON


 Landfill Gas Preprocessing Equipment
       In-line liquid removal by "slug catcher: Modified tank (see text)
       Landfill gas flow monitoring: Daniels orifice
       Landfill gas oxygen content measurement (see text):  Teledyne fuel-cell based oxygen
       meter
       Gas filtration for paniculate and  water removal: Peco coalescing filter (4 inches w.g.
       pressure drop), 10 micron cutoff, and vane-type coalescer
       Landfill gas compressor Solar/Howden oil-flooded two-stage, -28 inches w.g. to 150 psi

 Energy Equipment

       Overall generator set description:  Saturn T-1300
       Turbine subcomponent of  generator system: Solar Saturn, Model  GSC  1200R, 1988
       model year.
       Generator subcomponent: Marathon, 950 kW
       Other electrical power system components: Standard Solar engineered package


 device to intercept free liquids ("slug catcher*)-  This is essentially a baffled tank designed to intercept
 quantities of condensate  liquid that build up or pool at low points In the gas system and may "very
 occasionally* mobilize in the gas system and move with the flowing gas as a large "slug" to the plant. Any
 such liquid must be intercepted to prevent damage to plant equipment.  After the slug  catcher, the gas
 passes consecutively through a coalescing filter and vane scrubber, where aerosols  and particulates
 down to 10 microns are removed.  The volumetric flow rate of the gas is measured by  a Daniels orifice
 flow meter.  The scrubbed landfill gas  undergoes two stages of  compression in an oil-flooded screw
 compressor (see block diagram in 9); gas exits the first compressor stage at about 50 psig and the
 second stage at about 150 psig.  The compressed gas temperature when  it leaves the second stage is
 about 200'F. The gas contains entrained oil from the screw compressor, which is then removed by a
 knockout vessel and coalescing filter.  Gas then passes to a cooler, where water is condensed out. The
 gas Is then reheated to 35 to 40'F above the dewpoint before passing through a gas pressure regulator
 and then to the turbine.  This final reheat  is needed to produce  the dry  gas required for trouble-free
 operation of the gas turbine fuel metering system.

 Turbomachlnery. The two Saturn turbine powered gensets (table 22) are adaptations of standard Solar
 designs for power generation at sites such as offshore gas  platforms.  Plant  thermal-to-mechanical
 efficiency and electric power generating efficiency are improved through  recuperation of inlet air with
 turbine exhaust, as is commonly practiced.  The need for operator attention is kept fairly tow by using a
 process monitoring  and control system developed by Solar.  This  system acquires,  conditions, and
 processes data and has capabilities including process control, operational data logging, and remote data
 acquisition.  The remaining equipment is also standard.  Other specifications and characteristics of the
 turbines and generating equipment are presented in table 22.
 Performance/availability Issues. Solar states the net heat rate for power generation by the facility to be
 about 14,500 Btus/kWh based on gas tower heating value, which translates to about 16,000 Btus/kWh
 based on the landfill methane's higher heating value. The overall plant generating efficiency with this gas
turbine is tower than would be obtained on "normal" pipeline natural gas fuel; this is mostly attributable to
  PJG G640101A.AOW

-------
HOT TURBINE I
EXHAUST
    POWER
   TU GRID
         GENERATOR
                       HEATED'
                       COMPRESSED
                       AIR TO
                       CDMBUSTOR
                                     RECUPERATOR
V
                             A
                                                          A
                           TURBINE EXHAUST
                           TO ATMOSPHERE
                                AIR FROM
                                TURBINE
                                COMPRESSOR
                                      I
                                          AIR TD TURBINE
                                          COMPRESSOR
in
-f*
                                                                           FUEL GAS
                                                                           HEAT EXCHANGER
LANDFILL GAS FROM
COLLECTION SYSYTEM
            VANE TYPE
            SCRUBBER
                                              SCREW
                                              COMPRESSOR
                                              SKID
                            CONDENSATE
     Y
CDNDENSATE
                                        Figure 9
          Gas Turbine  /  Electric Power Facility  At  Sycamore  Canyon
               Simplified  Block  Diagram  Showing Major  Components

-------
 parasitic compression work required for landfill  gas.   (Pipeline gas fuel is normally  available  under
 pressure, and requires no further compression when used as a turbine fuel; however, landfill gas at
 atmospheric pressure requires additional work to  compress to 200 psi, as discussed in earlier sections.)
 Efficiency may be slightly further reduced because less  air recuperation can  be practiced; air subject to
 recuperation is a lower fraction of the total feed  gas entering the turbine than would be the case with
 natural gas fuel.  (The carbon dioxide portion of the landfill gas makes up a greater portion of the diluent
 gas and, with current practice, it is not recuperated.)
 These factors (predominantly gas compression) add to the parasitic toad  (200 kW) and  reduce the
 efficiency, resulting in a net output of 1.325 kW.
 As normally constrained by blade temperature limits, the turbine's maximum power output increases with
 the mass of gas that the turbine can take in; this mass and thus the power output increases as the
 temperature of the gas intake decreases.  The entering combustion air is therefore precooled on hotter
 days by passing it through an  evaporative cooler.  Necessary on-site makeup water for  this cooler is
 being provided by Culligan Water until permanent city water lines are installed.

 Availability. Turbine availability may be expressed as hours of on-line availability in response to need. It
 can also be compared to that for  the same turbine operating on a normal 100 percent available natural
 gas supply. Solar states that an availability of 90 to 93 percent with landfill gas would be expected.  Such
 availability with normal natural gas is stated by Solar to be 98 percent, since downtime for gas turbine
 maintenance is typically tow.  The additional downtime with landfill gas is attributable to  landfill gas field
 supply problems and modifications of that part of the plant specific to landfill gas processing.

 5.4.5  Environmental

 Source test of generating facilities are required under rules of the San Diego Air Pollution Control District.
 Two source tests have given actual exhaust gas composition results as shown in table 23.
 Permitted emission levels were not obtainable. Solar states "Emission levels were consistent with current
 production gas turbines.  This has  not limited energy recovery.*

 5.4.6  Economics

 Economic factors are summarized in table 24.  From limited data provided  by Solar, economic return
 appears to have been lower than desirable to date. It must be emphasized that these economic indices
 are for a limited term, and specific to this site and situation. The continuing installation of such turbines at
 landfills by others (particularly  Waste  Management, Incorporated)  attests  that  such turbines  can be
 economically attractive.

              TABLE 23. SOME  EMISSION TEST RESULTS AT SYCAMORE CANYON

                                     	Test date	
                                     Feb. 2.1989          Feb. 3.1989

Percent O2 (for reference):             1751 percent         17.56 percent

NOX:                                 49.07 ppm            40.70 ppm

CO:                                   4.71 ppm             4.68 ppm

NMHC:                               3.5 ppm              1.7 ppm

S02:                                  Oppm               Oppm
  PJG G640101A AOW

-------
            TABLE 24. ECONOMIC DATA: SYCAMORE CANYON GENERATING FACILITY1
      1. Capital investment for energy facility: $4,000,000
      2. Gross revenues from electric sales (as operated)
         1989:         Sales                $400,000
                       Capacity payment     $150,000
                       Total                 $550,000

         1990          Sales                $500,000
                       Capacity payment     $150,000
                       Total                 $650.000
      3. Standard Offer number 4 electric sales contract—80 percent fixed, 20 percent floating.
         Further details not available from Solar.
      4. Typical operating and maintenance (not including gas): $400,000/year
        Operator 40 to 48 hours/week (cost included as component of above)
      5. Total gas cost (includes royalties and other costs): $350,000/year
      6. Gas royalties to County: Approximately 2.5 percent of net electrical sales
      7. Landfill gas system operation  and maintenance costs of approximately $15,000 per
         month
 1. AN figures provided by Solar

 5.4.7   Operation and maintenance
 Day-to-day operations of the generating plant (excluding service visits and operation of the gas collection
 system) are carried  out by one site operator, and Solar reports an operator labor requirement of 5 to
 6 days  per week.  The principal maintenance Items were stated to be lubricating oil, spare parts usage
 and overhauls.
 5.43  Discussion
 Performance differences attributable to landfill gas.  Solar reports  that efficiency  is reduced by
 13 percent from the efficiency that would be obtained with  the same turbine on more conventional pipeline
 gas or distillate fuels. This toss is almost entirely due to  the greater parasitic toad posed by landfill gas
 compression.
 Other problems or malfunctions  of the energy equipment,  specifically attributable to landfill gas, have not
 been seen. (Such problems have been seen and addressed with similar turbines at other sites and were
 discussed  in 3.1.5.  The gas preprocessing system  at Sycamore as designed by Solar appears to be
 adequate to prevent these problems). One problem that can be considered landfill-gas specific is posed
 in gas preprocessing by the "slugs" of liquid, which occasionally mobilize and reach the slug catcher at
the plant.
Plans.  A larger "slug catcher* is planned to further reduce the possibility of damage due to liquid entering
the plant.   (While this modification is judged desirable by  Solar, it also  must be  noted that this plant has

-------
 suffered no damage from this source to date.) As of the site visit, Solar stated that there were no plans
 for facility expansion.
 Lesson learned.  Other than the need to protect the plant with a larger 'slug catcher," Solar did not
 identify any lessons learned regarding the energy plant itself.
 Note added:  In 1992, the facility was reported by Solar as sold to Laidlaw Gas Recovery Systems,
 Incorporated8.

 5.5 Landfill Gas Fueled Boiler: Raleigh, North Carolina

 5.5.1   Introduction and general overview
 In Raleigh, North Carolina, a boiler fueled by about 900 cfm (1,300,000 cfd) of landfill gas generates
 steam at a rate typically near 24,000 pounds per hour to meet the needs of a pharmaceutical plant.  The
 energy conversion system uses gas collected from a municipal landfill (Wilder^ Grove).  It consists of a
 pipeline transmission system, a boiler (Cleaver-Brooks), and the building housing it at the pharmaceutical
 plant  (Ajinomoto).  Basic features of the facility are  listed in table 25.  A photograph of the boiler (more
 details are presented later) is shown in figure 10.  Capital investment for the pipeline, pumping station,
 and boiler totals approximately $900,000.  Gross revenue from steam sales is running in the range of
 $450,000 to $500,000 per year.
 Participants in the project include Natural Power. Inc. (Natural Power), which had major responsibility for
 implementing the project; Raleigh Landfill Gas Corporation (RLGC), an affiliate of Palmer Capital, which
 installed the gas collection system and provide gas to the facility; Ajinomoto USA (Ajinomoto); and the
 City of  Raleigh (City), which owns the landfill.  The ownership and operational arrangements are  also
 summarized in table 25.  Natural Power  revenues are derived  from the sale of steam to Ajinomoto.
 Royalties from the steam sale revenues are paid to the  City of  Raleigh.  Landfill gas used in making
 steam is purchased by Natural Power from  RLGC. The CHy also gains environmental benefits from
 operating a gas system at its landfill, and RLGC benefits from  tax credits on the landfill gas sold to
 Natural Power.  Ajinomoto is supplied steam for its pharmaceutical plant operations at a competitive cost.
 System performance to date appears satisfactory for all partidpams.

 5.5.2   History of project Implementation

 The history of this project provides another example of complexities that can be encountered in attempts
 to find appropriate landfill gas energy uses, and then to implement a system. Securing needed landfill
 gas rights was difficult; much further analysis and investigation was also involved in the selection of an
 energy application and user. Events that occurred along the way to Implementation of the current energy
 system included the following.

 Negotiation for landfill gas rights.  The City initially recognized the energy and income potential of gas
 from Its landfills, and offered gas rights to  Its landfills by auction In  1984.  Natural Power was one of six
 bidders for these rights.  The award of rights was  based largely on the royalty offered by bidders on
 landfill-gas-derived energy income, and rights were awarded to another bidder, promising  the highest
 royalty.  About 2 years were required to establish that the bid winner (now out .of business) did not have
 the necessary resources to implement an energy system; the total delay engendered by these events
 was well over 2 years.
8  Ptnonal communication. R. AucsWmricz, Solar to D. Augenstoin. EMCON. February 1892.
  PJG G640101A ArtW

-------
Figure 10     Cleaver-Brooks Boiler at Plant of Ajinomolo, USA.  LandliH gas fueled boiler generates up to
             24,000 pounds per hour of steam for plant process use.

-------
            TABLE 25. STEAM BOILER FUELED BY LANDFILL GAS:  BASIC FEATURES	

 Location: Approximately 5 miles east of Raleigh, North Carolina
 Nature of application: Landfill gas is extracted, piped 3/4 mile and used to fuel a boiler.  The boiler
 supplies the steam needs of a pharmaceutical plant.
 Project start date:  December 1989

 Participants: Natural Power, Inc. (Natural Power), Raleigh Landfill Gas Corporation (RLGC), Ajinomoto.
 Inc. (Ajinomoto), and City of Raleigh (City)
 	Component	Owned bv	Operated bv	

        Landfill                       City                  City

        Landfill gas system            RLGC                Natural Power
        Pipeline                      Natural Power         Natural Power

        Boiler (Cleaver-Brooks)        Natural Power         Ajinomoto/Natural Power
        Boiler facility                  Natural Power         Ajinomoto/Natural Power

 Natural Power continued its efforts and the City Council ultimately awarded Natural Power the gas rights
 to Wildefs Grove landfill. It was known that the amount of waste in place was likely to  produce sufficient
 gas. Gas availability was confirmed with a 12-well test program in 1987. Natural Power had meanwhile
 been examining energy options;  the experience and interests  of  Bill Rowland  of Natural Power, had
 included the use of two small (85 kW) landfill-gas-fueled Caterpillar engines at  the Rowland landfill in
 Raleigh beginning in 1983.  In the mid-1980s, Natural Power had begun to look at generating units based
 on Caterpillar. Cooper-Superior, and Waukesha 1C engines and Solar Gas turbines, and investigated
 these  more intensively with the acquisition of gas rights.   Boilers .were also investigated; they  were
 determined to be among the most fundamentally attractive of the options based on return on investment,
 and specifically in  light of revenue based on avoided costs  of natural gas or oil,  which landfill gas could
 displace.

 In 1987,  Ajinomoto, under  a mile  from the landfill, was found to be a potential customer for boiler steam
 fueled by landfill gas from Wilder* Grove.  After further evaluation it was determined that the Ajinomoto
 boiler option was the best of the alternatives.  Palmer Capital (through RLGC) established a development
 relationship with Natural Power and the arrangement that currently exists was implemented.

 Natural Power notes that the present arrangement only came about after many years of work on the
 project during which there  was no financial return. The project came to fruition only because of the
 continued interest,  knowledge, and persistence of the participants.

 5.5.3  Landfill and landfill gas system

 Details of the landfill and landfill gas system are shown in table 26.  Wilder* Grove is a large "cut and fill"
 landfill that has been in operation since 1972. The landfill receives 1,200 to 1,400 tons per day of waste,
 5 days per week, and is expected to contain approximately 6 million tons of waste at closure. The landfill
 gas system was adapted by Natural Power from an initial design by SCS Engineers and, as of early 1991,
 had 70 wells. Other characteristics are as noted in the table.
 By indicators including waste in place, the 1987 12-well test, and operational experience, the  Wilder*
Grove  landfill generates methane  at a rate probably greatly exceeding  conversion needs.  A good clay
cover undoubtedly helps maximize methane recoverability and prevent air entrainment. Satisfactory gas
  P.?G

-------
           TABLE 26. LANDFILL AND GAS SYSTEM CHARACTERISTICS:  WILDER'S GROVE

   Landfill
         Location: Raleigh, North Carolina
         Type: Cut and Fill
         Date Opened:  1972
         Waste in Place (1991): 3.3 million tons
         Waste Rll Rate: 325,000 tons/year
         Total Fill Area: 125 acres
         Area Now Filled: 65 acres
         Climate: Temperate, warm, wet
         Annual Rainfall: 50 inches
         Daily, Intermediate, and Rnal Cover Soils: Clay
  Gas Extraction System
         Type:  Vertical Well
         Pipe Material: HDPE
         Lateral/Main Header Piping: Below ground
         System Details: Waste depth 40 to 100 feet. Well depth typically 80 percent of waste depth.
         Laterals and headers typically 3 feet below surface.
         Current Landfill Gas Collection Rate: 900 cfm (1.3 million cfd)
         Well Adjustment Protocol: GasTechtt meters used to analyze for methane.  Wells with flow
         below 50 percent throttled: flow of wells above 50 percent maintained and metered as needed.
         Gas Composition: Near 51  percent methane
        Gas Analysis Frequency: 12 times each month

 quality of about 51 percent methane is obtained with a three-times per week monitoring and adjustment
 schedule.  (Some problems have occurred with leaks and their detection in below-grade lines but these
 have not been serious enough to impede energy operations.)
 5.5.4  Energy equipment:  Blower station, pipeline and boiler
 Equipment characteristics are summarized in table 27.
 Blower/pumping station.  Motive  power for gas extraction and.gas pumping through the pipeline is
 provided by a blower as shown in table 27, which receives gas at up to 40 inches of water vacuum and
 discharges it at approximately 12 psig.  A filter system, with particle size cutoff of 1 micron, removes
 particles and aerosols from  the gas. The pumping station with blower  and  filter was engineered by
 Perennial Energy, Inc., of West Plains, Missouri.
 Pipeline. The pipeline extending from the pumping station at the Wilder* Grove Landfill to the boiler at
the Ajinomoto factory is a 12-inch outer diameter HDPE pipe. The pipeline slopes from each end toward
                 «niv

-------
                TABLE 27.  SUMMARY OF ENERGY EQUIPMENT CHARACTERISTICS

  Blower station
       Blower Hoffman 9 stage with GE motor
       Filter: Dual paniculate (custom design, Perennial Energy)

  Pipeline

       12-inch outer diameter HOPE, length 3/4 mile

  Energy Equipment

       Boiler. Cleaver-Brooks CB 800 hp; normal rating 26,800 Ib/hr steam on natural gas or oil

       Building housing boiler: Standard rectangular, 25-foot by 52-foot; dimensions adequate to allow
       access, tube removal, and other maintenance work

  the center so that all condensate can be collected at a single low point, located at a city sewer line near
  the midpoint of the pipe.  The pipeline is sized for greater than the current gas flow to allow for possible
  increased landfill gas consumption by the end user (Ajinomoto, see later).

  Boiler and building.  The Cleaver-Brooks boiler is nominally rated at 26,800 pounds per hour of steam
 on natural gas.  Landfill gas is fed to the boiler at 8 to 9 psi.  Other characteristics of the boiler are listed in
 table 27 and presented in appendix J.  This is a standard industrial boiler; its load varies as plant steam
 demand (for steam sterilization and other purposes) varies over the day.  It is housed in a building
 specifically designed for it (as noted in the table), furnished by Natural Power.

 One important boiler feature is its ability to operate on several different fuels:  pipeline natural gas.
 number six fuel oil, and landfill gas., This provides insurance against steam supply interruptions because
 of a lack of landfill gas fuel. The principal modification to the boiler to adapt it to  landfill gas use was
 (according to Ajinomoto factory staff) an increase in the number of gas injection ports (to accommodate
 the greater flow of landfill gas that must be introduced into the burner) and "minor modifications to the air
 supply. Some fine-tuning was required after boiler installation.

 5.5.5  Performance

 Boiler.  Over-all boiler availability and performance, has been very good.  The Cleaver-Brooks boiler
 normally supplies about 75 percent of the pharmaceutical plant's steam needs as the "primary* and
 lowest cost steam source; other backup boilers at Ajinomoto can fill in when it is not available. Natural
 Power reports  that the boiler's availability to meet its  share of plant steam needs when  its steam
 production could be used has been near 97 percent since installation. Much of the  initial down time has
 been shutdown for normal  preventive  maintenance and adjustments; a boiler gasket also had to be
 replaced.  No operating problems that would be attributable to operation on landfill gas, such as unusual
 corrosion, have been observed.

 The  thermal efficiency of the boiler, as measured by Cleaver-Brooks at the Ajinomoto  plant, has  been
 81.5 percent.  This is close to the efficiency expected with pipeline gas  and above the  80 percent
 efficiency Cleaver-Brooks guarantees with pipeline gas. At full output the steam generation rate has been
 near 24,000 pounds per hour, compared to an expected  rate with pipeline gas of 27,600 Ib/hr.  This
decrement In steam output of about 10 percent is expected as a normal consequence of the C02 dilution
effects with landfill gas. The controls, which balance the air and gas feeds based on exhaust oxygen
levels to tune the boiler, function well.
  P.in RftdnmiA Anw

-------
 Other. The pipeline blower station, and blower and filter provided with it, have been performing well with
 no unexpected problems.  Natural Power reports that no modifications have been necessary.

 5.5.6  Emissions

 Ajinomoto notes that the emissions have been standard for a boiler of this type, and satisfactory based on
 regulations.

 5.5.7  Operation and maintenance

 To date  Ajinomoto reports that  operating and maintenance needs for the  boiler are 'as normally
 experienced" for boilers of this size and type. The impact of minor maintenance work on boiler service
 was mentioned above.  Automated controls allow the boiler to be operated with very little attention. The
 boiler  incurs charges for electricity,  inspections, fees, and  insurance,  which are discussed under
 "Economics" (section 5.5.8).

 The filter in the automated condensate drain of the landfill gas pipeline requires cleaning, a minor job that
 is reported to take about 2 hours once a year. The filter in the pumping station has to be replaced when
 pressure  drop increases significantly (from 2 inches w.g. to, say, 3 inches).

 Note that much of the system has not operated long enough for indicative operation and maintenance
 histories to be developed.

 TABLE 28. ECONOMIC DATA FOR LANDFILL-GAS-FUELED BOILER: RALEIGH, NORTH CAROLINA
Approximate system capital costs:
Item Cost
Landfill gas system
Blower station
Pipeline
Boiler and Building
$500,000
$100.000
$200,000
$600,000
Owner
RLGC
RLGC
Natural Power
Natural Power
Financed bv
RLGC
RLGC
Natural
Natural


Power/First Citizens Bank
Power/First Citizens Bank
 Price paid for steam: Typically near $3.00/1,000 bs.

 Gross steam revenue, December 1989 (installation) to February 1991: $458,371

 Current gross steam revenue, annualized: $450,000 to 500,000
 Gross steam revenue distribution: Net proceeds to Natural Power, after royalties and gas purchase, are
 approximately 40 to 45 percent of gross revenue, approximately 40 percent of gross revenue goes to
 RLGC and approximately 15 percent to the City

Tax credits (to RLGC): Approximately $0.85/mmBtu sold in 1990 (this will fluctuate based on inflation
factor)

Natural Power payments relating to boiler: Electricity, $12,500 per year; insurance, $26,400 per yean
inspections/fees, $3,000 per year
Payments by RLGC to Natural Power for gas system operation and maintenance: Approximately
$42,000 per year

-------
 5.5.8  Economics

 Economic data are shown in table 28. The source of revenue is steam sales to Ajinomoto; the steam
 price is tied to the lowest cost fuel that is a reasonable alternative to landfill gas, usually natural gas from
 the local utility.  This results in a steam revenue, as stated by Natural Power near $3 per 1000 IDS. Gross
 revenue figures from inception to February 1991 are as shown in table 28.  Natural Power states that,
 based  on  current experience, annual revenue will continue to be $450,000 to $500,000.  Gross steam
 revenue, paid to Natural Power, is used to pay royalties to the City of Raleigh and to purchase landfill gas
 from RLGC.

 RLGC, owner of the landfill gas system and provider of the gas, also receives tax credits.  The specifics
 were not available but are at a rate based on the Wilder's Grove gas recovery rate and should exceed
 $150,000 per year.

 Other payment arrangements are as shown in the table, by Natural Power for boiler maintenance,  and by
 RLGC to Natural Power for operation of the gas field.

 Translating these figures into a return to the participants would need more detailed information in various
 areas such  as financing arrangements and depreciation schedules and  is  not attempted here.  All
 participants do appear to be satisfied with the economics.

 5.5.9  Discussion

 Performance effects attributable to landfill gas.  The significant difference in energy equipment
 performance due  to using landfill gas is the reduced boiler steam output, (approximately 10 percent).
 This is an expected consequence of the CO* dilution of the methane when landfill gas is used.  In all
 other respects, performance appears to be comparable to that expected with more conventional fuels.

 Other Issues.  The performance of other equipment has been as expected, and the parties contacted
 (Natural Power and Ajinomoto) appear to be pleased. Economic performance has been satisfactory.
 Lessons learned. The principal lesson learned to date  appears to be that the system can function as
 planned and, more generally, that boiler fueling with landfill gas can be an attractive application.

 Plans.  In  view of the availability of gas, additional pipeline capacity, and performance of the system to
 date, Ajinomoto and  Natural Power  are considering various additional gas uses including absorption
 chillers  and steam turbines.

 5.6  Electrical Power Generation Using Caterpillar Engines at the Central Landfill,
     Yolo County, California

 5.6.1 Introduction and general overview

 The Yolo County Central Landfill is about five miles northeast of the town of Davis, California. Gas from
the landfill  fuels an energy conversion system consisting of three Caterpillar engine powered gensets,
whose collective output totals near 1,500 kW. The generated power is delivered via an interconnect 3/4
mile to nearby PG&E high voltage power lines. A photograph of the facility is shown in figure 11.

General site  and  equipment information is shown  in table 29.  The various  participants and  their
responsibilities in the project are:

      •  Yolo Gas Recovery Corporation, a  partnership  between Palmer Capital and  Hazox,
        has until recently owned and had overall managerial responsibilities for the  energy
        equipment, that is, the  gensets, gas cleanup train, interconnect and other associated
        equipment.
  PJG GB40101A AOW                         e->

-------
Figure 11     Electrical Generating Facility at Yolo County Central Landfill.  Trailers each house engine-
              generatonj driven by Caterpillar G399 engines.  Gas pretreatment equipment Is to ten of picture.

-------
       •  Stowe Engineering has most recently been managing the day-to-day operation of the
         energy equipment.
       •  Operation, maintenance, and management of the landfill gas system and delivery of
         collected gas to the gensets has been the continuing responsibility of Monterey Landfill
         Gas Corporation, a subsidiary of EMCON Associates.
       •  Yoto County, the owner of the landfill, receives royalties based on net power revenue
         but has no managerial involvement.
 YGRC has until  recently received its benefits in the form of a portion of the gross  electrical power
 revenue.  Stowe and other equipment operators (see below)  have received contract  payments for
 operating the equipment, which are in part tied to performance.  MLGC receives benefits in terms of tax
 credits, and a royalty on net electric sales.
 This project has been marked by  several difficulties, posed both by site conditions and  equipment
 problems.   Although some of the problems have been resolved, the problems and  consequent falling
 revenue have been severe recently. These are discussed below. It must be recognized that records are
 in some cases incomplete because of recent changes and events that have occurred.

 5.6.2  History of project Implementation
 The County initially commissioned a landfill gas recovery study in 1983, conducted by EMCON. Test well
 extractions were run in 1983 (and subsequently). The recoverable gas was also forecast at several times
 using various assumptions and an EMCON model. One set of the model projections for this landfill  have
 been published (Augenstein and Pacey, 1991); the well tests indicated somewhat higher availability than
 did the model projections. Based on a combination of model and test well results, as well as assumptions
 about future waste placement rates,  gas availability was judged sufficient to support the three gensets
 actually installed (if not immediately on installation, then within a reasonably short time thereafter as gas
 recovery would continue to rise over time).

 In 1987, the county commissioned additional work with EMCON to develop a bid package to enable the
 selection of a developer for a gas recovery project. Several factors were helpful to implementation of this
 project: a favorable electrical energy pricing schedule, a significant and growing waste repository, and an
 enthusiastic and  progressive  County administration.   This  project was difficult to  implement as the
 competition for the project involved a number of bidders and an extended bid process.  Near the end of
 the bidding process, the local utility terminated the offering of its most favorable energy pricing contract (A
 California Standard Offer Number Four), which was one key to project viability.  Palmer Capital had
 secured such a favorable standard offer contract from the utility just before the deadline, but no  other
 bidder did  so.  Subsequent to Palmer's securing the standard  offer, the  County awarded  Hazox the
 contract to develop the project. Hazox was unable to secure a contract as favorable as Palmer's from
 PG&E; however Hazox and Palmer recognized that each held a necessary ingredient for a successful
 project. They were able to jointly able to agree on a partnership approach  which led to the formation of
 YGRC.  •
 YGRC, which had responsibility  for the energy equipment (excluding landfill gas recovery) invited
 EMCON to acquire the landfill gas rights and to undertake the collection system installation, operations
 and management.  EMCON placed this project into Its gas recovery subsidiary, MLGC.
 Gensets driven by three Caterpillar G399 engines were secured by YGRC from Tenco Corporation, of
 Sacramento, California.  This acquisition was possible at a favorable price, because this line of engines
was being discontinued by Caterpillar and two of these engines were surplus  to other needs that had
been  anticipated  earlier;  the  third  engine  was  reconditioned.   This engine  model  has been  used
extensively as a naturally aspirated landfill gas engine (see GRCDA/SWANA, 1989). However, Yoto
represented its first use in a lean-bum operating mode.
  o irs rs

-------
    TABLE 29. BASIC FEATURES: ELECTRICITY GENERATION AT THE YOLO COUNTY CENTRAL

                                           LANDFILL

  General Nature of Application: Electric power generation and sale to grid

  Location:  Five miles northeast of Davis, CA. (also, 12 miles northwest of Sacramento, CA)

  Energy equipment: Gensets powered by three Caterpillar G399 Engines, with auxiliaries including gas
  processing skid and interconnect

  Energy equipment owner Yolo Gas Recovery Corporation (YGRC)
  Gas extraction system design: EMCON Associates

  Gas system operation: Monterey Landfill Gas Corporation (MLGC)
  Landfill owner: Yolo County

  Landfill operating contractor:  Earthco


  A compression/refrigeration approach to gas cleanup was selected, based on availability of a low-cost
  reconditioned unit that was obtained from Southern California where  is had been previously used for
  landfill gas treatment. The possible significance of this choice to project problems is also discussed later.
  Design and construction of the facility was carried out by Wellhead Electric Corporation of Sacramento,
 California. The first electricity production was in October 1989.

 Of note as part of this implementation process is that a number of operators have been employed since
 startup. Wellhead Electric was the initial operator of the system from October 1989 to July 1990.  EOS,
 Inc.,  was operator from July 1990 to February  1991.  From February 1991 to May 1991, the system
 operation was supported by the efforts of Richard Ontiveros of Palmer Capital.   From May 1991 to
 November 1991. Perennial Energy headquartered in West Plains, Missouri, was the operator subsequent
 to withdrawal of YGRC and Perennial from the project (in November 1991) Stowe Engineering of Quincy,
 MA has been responsible for operations, as well as certain other  managerial duties related  to energy
 equipment.

 5.6.3  Landfill and landfill gas extraction system

 Details of the landfill and landfill gas extraction system are presented in table 30.  The Central Landfill is a
 large landfill of the "area fir type, begun in 1976. Fill rate is about 1,000 tons per day of mostly municipal
 waste: slightly over 3 million tons had been  placed as of early 1991.  Depth of fill ranges from 30 to
 70 feet in the areas where gas is currently extracted.

 The landfill is managed to maximize landfill gas recovery while maintaining a relatively  high level of
 methane concentration (generally 49 to 51 percent).  Modules are of variable size and depth; each
 module is monitored at least twice weekly and appropriate weP and header adjustments in flow are made
to achieve the desired control.  There is relatively small fluctuation in gas quality and quantity on a short-
term basis.  Occasional problems occur in the gas collection system delivery, generally attributable to
pipe joint failure, or flexible coupling failure.  These conditions are usually repaired within a few hours of
their occurrence. All piping is PVC and, with exception of the vertical wells, is above ground.

Landfill gas quantity should increase gradually as the waste resource expands over the coming decades.

-------
                              ENGINE
                              EXHAUST
                              TO
                              ATMOSPHERE
 INTERCONNECT
 TO GRID
                  GENERATORS
LANDFILL GAS FROM
COLLECTION SYSTEM
  CATERPILLAR
   ENGINE(S)
     (3)
  2-STAGE
 COMPRESSOR
1 PSI  TO 60 PSI
                AFTERCODLER
                                           CONDENSATE
        TURBOCHARGER
COALESCING
  FILTER
                                             AIR
— -^
*-~^
PROPANE
CHILLER
(TO 35 F)

•— . .»,
~— =*
MOISTURE
KNOCKOUT
\
/
                                                                            CONDENSATE
                                       Figure 12
             Electric  Power  Generation  Based Dn  Caterpillar Engines
                           At  Yolo  County  Central  Landfill
                Simplified Block Diagram  Showing  Major Components

-------
      TABLE 30. LANDFILL AND LANDFILL GAS SYSTEM: YOLO COUNTY CENTRAL LANDFILL


 Landfill
       Landfill type: Area fill
       Location:   Yoto  County, 5 miles northeast  of  Davis. CA (12  miles  northwest of
       Sacramento, California)
       Waste type: Residential municipal

       Waste depth: To more than  70 feet
       Rl rate: 280,000 tons/year (in 1991)

       Climate: Semi-arid (rainfall:  15 inches per year)
       Final cover: 4 feet of clay

 Gas extraction System
       Type: vertical well
       Number of active vertical wells:  80
       Laterals and main header: PVC, above ground
       Permeable zone of wells: Extending from 20 feet below landfill cover to bottom of well.

       Current collection rate: 900 to 950 dm
       Well adjustment objective:  To maximize Btu delivery to gertsets, while maintaining gas
       concentrations over 52 percent
       Adjustment protocol: Flow  of wells showing over 52 percent methane increased until
       concentration begins to fall; wells under 52 percent throttled.  Wellhead composition
       monitored and well flows adjusted approximately once per month.
       Gas analysis method: Wells and main header by GasTech® thermal conductivity based methane
       meters.


5.6.4  Gas preprocessing and energy conversion equipment
A simplified  block diagram for the energy conversion system is shown in figure 12. A listing  of the gas
pre-processing and energy conversion equipment is presented in table 31.
Landfill gas handling and pre-processing.  A variable-speed Hauck centrifugal blower normally
provides the vacuum  used to extract the gas from  the  landfill.  The gas is delivered to  a 2-stage
compressor.  The first stage compresses the gas to 15 psig, and the second stage further compresses
the gas to a discharge pressure of 60 psig.  (The blower may also be bypassed, and the field vacuum
provided by  the compressor.)  Pre-treatment occurs initially by passage of the gas through 2 knockout
pots before the gas enters the compressor. The gas  entrains some  oil and is  heated to about 275'F in
the compression cycle.  The gas is  then cooled to 78T as It passes through oil knockout and an
aftercooler.  It then passes through  a refrigeration  unit  to tower the temperature to 35'F; resulting
condensate is bled at  several takeoff points from the  aftercooler and in refrigeration steps.  The gas is
reheated to 80 to 90°F as it leaves the refrigeration unit and passes through a coalescing filter just prior to
being delivered into the internal combustion engines.
                 anw

-------
 Electrical genset equipment. The internal combustion engines are Caterpillar units, Model Cat G-399,
 each rated nominally at 650 kW on pipeline natural gas. These are an earlier line of Caterpillar natural-
 gas-adapted engines.  They are stated to be without certain landfill gas adaptations incorporated by
 Caterpillar0 engines of more recent manufacture. Cooling water at the site has been provided by on-sfte
 wells; other options are under consideration because of water quality.  An evaporative cooling tower is
 provided in association with each engine to cool air for carburetion.

 The YGRC facility includes an interconnect that steps up voltage from that of the generator to power lines
 3/4 mile away. The contract for power sale by the facility would permit the sale of up to 12 MW of power
 to the  grid.   Since the facility can typically generate  near  1.5MW,  more than 10 MW of additional
 generating capacity could be accepted.

 5.6.5  Performance and availability Issues

 Net engine output. The gross capacity of the gensets—if operated on natural gas—would be around
 1.950KW.  The net power output  has  been experienced, however, at between 1,300 and 1,500 kW
 depending on operating factors. Factors leading to the lower power output include a normally expected
 decrement of about 200 kW due to the use of landfill gas, as opposed to pipeline or natural gas.  An
 additional  loss is  due to  about 200 kW  of parasttics  (including about 80 kW  of  power used by the
 refrigeration equipment on the skid). These two  factors would atone reduce output from 1,950 to about
 1,550 kW.  Other problems including engine landfill gas compressor inefficiency (due to corrosion and
 suspected piston btowby), reduce output still further.  An additional consideration is that less gas has
 been extractable in summer,  when the landfill clay cover dries and is more permeable, than in winter.
 Gas does not limit output during the winter (the California rains seal the cover) but does slightly in
 summer, the  result of all of these factors is that output  is in  the 1,300 to 1,500 kW range. (The
 expectations of YGRC were, apparently, that 1,700 kW of  net output would instead be obtained at
 optimum operating conditions)


    TABLE 31.  GAS PRE-PROCESSING AND ENERGY CONVERSION EQUIPMENT AT THE YOLO

                                 COUNTY CENTRAL LANDFILL

 Gas Handling and Processing

      Blower: Hauck 25 HP. (at maximum power) model TBG-9-071-271-FX-1

      Compressor: Joy Manufacturing, appx. 1 psig to 60 psig. (model WBF72XHD)

      Chiller:  York, propane working fluid, cools  gas from ambient to 34-36T (model not
      available)

      Moisture knockouts and demisters:  Custom fabricated

      Final gas filtration, just prior to engine: Coalescing, model not available

Energy Equipment

      Gensets:  Three Caterpillar G-399  16 cylinder engines, driving generators.  650 kW
      (gross nameplate capacity on pipeline natural gas)

      Cooler for engine intake air: Custom design, evaporative

      On-site water supply: Wells
   Personal communication, Curt* Chadwick. Caterpillar Corporation, Mossvite, IKnois. September 1091.
  PJG  G640101A AOW

-------
  Regarding efficiency, YGRC reports that the heat rate of the engine, when operating optimally, has been
  near 12,500 Btu/kWh (which is good).  Note, however, that this value is somewhat uncertain given some
  gas flow measurement uncertainties.

  As an introduction to further discussion of performance and availability issues, note that these have been
  poor because of both equipment and site-specific problems. These have included, but are not limited to,
  the following:

        •  Engines damaged by liquid landfill gas condensate entering the engine intake manifold
          with the landfill gas.   (This  is shown in site  operating logs.)   This has apparently
          occurred despite the existence of knockout  pots and other  equipment that were
          designed to prevent such occurrences.

        •  Corrosion of  all engines, typical of engine attack by acidic combustion products as
          outlined in section 2.   The most serious problem began with valve and valve guide
          erosion, which occurred to such an extent that valve play resulted in valves hitting and
          scoring cylinder liners, damaging them.

        •  Problems relating to well water hardness.   As noted, the well water, which has been
          used for cooling is extremely hard (hardness reportedly increased sharply in 1989 after
         the major October earthquake, which may have cracked the well casing). This has led
         to deposit buildups in the engine block and oil cooler ports, through which the water
         circulates.  Such ports had to be manually cleaned frequently, or else engines and oil
         overheated.  Solids buildup and btowdown also posed a problem with evaporative
         coolers.

       • Limitations  posed by landfill  gas supply.  For reasons identified earlier, landfill  gas
         supplies have been adequate  during wet seasons when the moist clay final cover
         sealed well, but may have been slightly limiting (reducing power by up to 10 percent
         relative to that otherwise attainable) when the cover dried in the summer.
 In addition to an of the above, less serious mishaps have occurred, such as Hauck blower breakdowns
 causing limited shutdowns, refrigeration equipment breakdowns, and electrical panel shutdowns because
 of overheating.  There was also an extremely hard freeze in December 1990 that damaged water lines
 (by freezing and bursting), evaporative coolers, and other equipment.

 Engine corrosion/wear problems might  be considered  among the most serious problems at the site.
 These are exemplified by recent experiences with the three genset engines, after an earlier overhaul that
 left cylinders in good condition.  The findings were by borescope (a process allowing the interior of the
 cylinder to be inspected visually for damage). Engine 1 had run about 1,200 hours, engine 2 about  2,400
 and engine 3 slightly over 3,000 hours. Borescope inspection showed that the cylinder liners of engines 2
 and 3 were severely damaged. The damage apparently resulted from a sequence in which wearing valve
 guides allowed valve stems to wobble, the wobbling valves wore the seats, and this wear also allowed the
 valves to  hit, score,  and seriously damage the cylinder liners. The damage to engines 2 and 3 was
 serious enough that they were shut down. Engines 1 and 2 were renovated and put back into operations
 as of December 1991.

The  problems above have  resulted in service factors (output in relation to a selected  standard of fuD
continuous power production) which are low. Net kilowatt hour sales for 1989,1990, and 1991 are shown
in table 32.  If service factor is defined as output in relation to continuous output at a power operation  of
 1,400 kW, the service factors for 1989 would be less  than 50 percent, and for 1990 68 percent. YGRC*s
preliminary projection for 1991 (see further discussion below) was for power production which translates
to a service factor of 47 percent

-------
 5.6.6  Environmental/emissions
 YGRC states only that the facility has been in compliance with all permit requirements, and that no
 problems have been experienced.

 5.6.7  Operation and maintenance
 The normal day-to-day operations at the site are carried out by a single operator. Additional maintenance
 is earned out such that YGRC has reported a total labor requirement at the site of about 60 hours/week.10
 Engine oil was initially Hydrotech, changed at approximately 1,000-hour intervals, but was recently
 switched to Mobil Pegasus 446.  Intervals between changes are currently around 850 hours. YGRC,
 while  not reporting exact intervals between engine rebuild, maintenance steps, and so on, reports (as
 could  be expected)  that these have been far more frequent than desirable10.  The range of other
 operating difficulties described in 5.6.5 has been very much outside of routine; such information as was
 available on those problems was presented in that section.

 5.6.8  Economics

 Table  32 shows that  economic information available when this report was prepared.  A portion of the
 energy equipment capital investment was provided by  a loan from the State Street Bank and Trust
 Corporation  of Boston, Massachusetts.   Gas rights  were  purchased  by  EMCON associates for
 $1.4 million dollars, and EMCON also furnished the gas  system construction for an additional $300,000
 as shown.  The power  purchase contract is a variation  of California's Standard Offer Number 4.  The
 contract allows PG&E to curtail (not pay) the vendor, YGRC, for up to 1000 hours per year. The gross
 revenues for 1989 and  1990, as well as YGRC's estimates for 1991 revenue are shown.  It should be
 emphasized that 1991 revenues are only estimates; exact 1991  revenue and its allocation to participants
 is not currently available.

 The economic situation has been quite evidently bleak.  To  summarize, the combination  of lower than
 expected revenues, combined with high repair costs, caused default on the loan from State Street Bank in
 November 1991. Perennial Energy withdrew from the project in November. Stowe Engineering of Quincy,
 Massachusetts has taken over management of the energy  equipment operations from YGRC and
 Perennial; MLGC (EMCON's) role remains unchanged and it is continuing to operate the gas system.

 Despite these serious problems, these are positive factors from economic and other standpoints. The
 site has a good power contract, interconnect, and other features.  With  successful operation of the
 gensets at service factors comparable to Brown Station Road, Otay, or Marina as discussed in this report,
 Yoto is judged to have the potential tor an acceptable return.

 5.6.9  Discussion

 The energy facility at the Yoto County Central Landfill has experienced problems that have been serious
 by normal standards of landfill gas energy projects, which often  experience problems. The causes of the
 problems remain to some extent speculative, but it is worth offering speculation both as to cause and the
potential remedies.

The corrosion problems  seen with the gensets seem attributable to the combination of (1) reliance on a
compression/refrigeration system tor gas cleanup, with (2) engines whose  conventional construction of
earlier  design may have  imparted little  resistance  to  acid gas  corrosion.   As noted  in section 2.
refrigeration  will  not  be  particularly effective in removing tower molecular  weight  halocarbons,
10
   Personal communication. David Marquaz. Palmar Capital Corporation. San Frandsoo. CA. September. 1M1.
  PJG

-------
      TABLE 32.  ECONOMIC DATA: ENERGY FACILITY AT YOLO COUNTY CENTRAL LANDFILL

  Capital investment for energy equipment: $1.8 million

  Payment for gas rights, by EMCON: $1.4 million
  Cost of gas extraction system (paid by EMCON): $300.000

  Kilowatt sales and power revenue by yean

  year          kWn output                  PG&E power payments

  1989           900,720                    $70,844

  1990          8,366,190                   $877,518
  1991 (est).      5,800,000                   $700,000

  Tax credits realized by EMCON: 1989 « $215.900,1990 • $198,920

  Power Contract:  Variant of California Standard Offer 4.

  Terms of Perennial Energy Contract: Payments based on kWh output-further detail not available

  Distribution of power revenue to participants: Not currently available
  Operating costs: Not currently available


 particularly  the CFCs.   Hatocarbons have evidently entered the engines and  acid gas combustion
 products have been produced. Information is not available on how, specifically, the existing Caterpillar
 G399 engines that are not landfill-gas adapted differ from later models that are.  It is, however, clear that
 corrosion susceptbilHy has been a major cause of problems at the site.  (Also note that the G399 engine
 in stoichiometric-bum mode has served extensively in earlier landfill gas applications.  See Chadwick,
 1989).

 The  problem  of condensate entering the engine  appears, in retrospect, to be due  to an unanticipated
 sequence of events that occur when one or more engines are idle.  Line layout and design were such that
 with one or two engines operating, condensate would pool in the gas lines entering the idle engine(s) and
 on restart would be entrained into the engine being re-started in spite of traps.

 Other problems at the site  have already been discussed in some detail in 5.6.5.

 Potential mitigating steps.  It  is  not clear that the  landfill gas refrigeration  skid provides engine
 protection commensurate to its cost or energy consumption (80 kW).  It is possible that effectiveness in
 removing the  halocarbon  components is minimal.   Stowe Engineering, now in charge of the energy
 equipment (on behalf of State Street  Bank) is considering eliminating ft entirely. Stowe is also considering
 the replacement of certain key engine parts, currently corrosion susceptible, such as valve guides, with
 parts made  of more  corrosion resistant materials.  This is in planning stages.  Other problems have
 straightforward solutions: condensate entry into the engines can be eliminated through proper redesign.
 A soft water supply can be obtained  by several possible routes now under consideration such as reverse
 osmosis.  Gas  supply problems to  the extent seen could be readily eliminated by  pipeline gas
 supplementation.  Analysis and planning for a combination of such mitigating steps are underway.

5.7 Other Relevant Case Studies and Information

The  preceding case studies presented recent information  on six representative  landfill gas  energy
applications  in the U.S.  Many additional descriptions and studies of past and current landfill gas energy

-------
 applications, with varying amounts of detail, can also be found in the literature.  Some further information
 sources are as follows.
 Methane  Recovery from Landfill Yearbook.  The  Government  Advisory Associates,  Inc. (GAA)  has
 published (in 1986,1988, and 1991) the Methane Recovery from Landfill Yearbook. GAA circulates a
 questionnaire to all U.S. landfills identifiable as delivering their gas to energy applications.  The yearbook
 publishes data based on all responses obtained, which includes summary information on landfill features,
 gas recovery, type and capacity of energy application, owners/operators, contacts, and other information.
 Statistical analyses of  collected data are  also performed to develop overviews  of  issues such as
 economics (some of the statistics have been cited in this report). Although data in some areas are not as
 complete as the case study data in this report the yearbook contains a wealth of information and is by far
 the most complete available reference in terms of numbers of sites covered in the U.S.; it is available
 from GAA, 177 East 87th Street, New York, New York 10128.
 SWANA/GRCDA Landfill Gas Conference Proceedings.  Descriptions of landfill gas energy applications
 are found in past proceedings of landfill gas symposia sponsored by SWANA (Solid Waste Association of
 North America; formerly the GRCDA), as follows:
 Tour Sites.  In many instances the SWANA annual landfill gas conferences were held near the sites of
 landfill gas energy applications.  These were generally available to be toured by conference attendees,
 and fact sheets including site description, application, and other data are published in the conference
 proceedings.  A list  of the descriptions of specific  tour sites  is presented, arranged by year  and
 proceedings issue, in table 33. (Note that, as published in the conference proceedings, the data on many
 tour sites may be rather limited.)
 Some of the more detailed case histories  In past SWANA proceedings (in many cases listed under
 GRCOA), providing information somewhat similar to the case studies of this report, include the following:

      • A discussion in the 1989 proceedings by major engine  manufacturers (Caterpillar,
        Cooper  Superior,  Waukesha,  Solar Gas Turbines)  of experience  on landfill gas
        (articles beginning on page 187).  Discussions of corrosion effects are included.
      • A discussion in the 1986  proceedings (page 158) on  the  selection of the energy
        conversion process and project implementation, for a landfill  gas fueled boiler project
        for a Goodyear plant in Lansing, Michigan (Guter and Nuerenberg, 1986).

      • A discussion in the 1986 proceedings of several electrical energy projects (Jansen,
        1986, page 135, and Cortopassi, Toth, and Williams, 1986, page 185).

      • A case  study in the 1984 proceedings  on the collection and use of landfill gas at a
        wastewater treatment plant (McDonald, 1984, page 109).

      • A discussion in the 1984 proceedings on three  small electric projects (Nielsen, 1984,
        page 135).

      • A discussion in the 1984 proceedings on the planning  of a medium Btu plant in
        Cinnaminson, New Jersey (Yeung, 1984, page 238).

SWANA, from whom past proceedings are  available, is located  at 8750 Georgia Avenue,  Suite E-140,
Silver Spring, Maryland, 20910.
U.K. Program. After the United States effort, the United Kingdom's (U.K.) effort is perhaps the largest.
The documentation of energy uses in the U.K.  has been  extensive;  a wealth of information has been
compiled with active government support.  Some brief fact sheets  on two electrical generating projects
and two boiler projects  are  included for reference in appendix K.. Lengthier case studies of interest
include the following:

      •  A description of the electrical generating project  at  Stewartby, U.  K., (ETSU, 1989)
        amplifying the summary description of this site in appendix K.
  PJG G640101A AOW

-------
              TABLE 33. SWANA LANDFILL GAS ENERGY FACILITY TOUR SITES
SWANA/GRCDA
Proceedings Year
1991
                      Tour site
                      Described
                      Otay2, San Diego, CA
                      Sycamore Canyon2, San Diego, CA
  1989                Crazy Horse, Salinas, CA
                      Santa Cruz, CA
                      Marina2, CA
  1986                Mountaingate, Los Angeles
                      Olinda. Brea CA
                      Toyon, Los Angeles CA
                      Penrose, Sun Valley CA
                      Bradley, Sun Valley CA
                      Industry Hills, Industry CA
                      Puente Hills. WhfttierCA
 1984                 Cinnaminson, NJ3
 1983                 Azusa, CA
                      SchoD Canyon. CA
                      Duarte, CA
                      Sheldon-Arteta, CA9
                      North Valley. CA3
                      Monterey Park. CA3
 1. Notation and abbreviations:
       MW • Megawatts electrical capacity
       IC • Reciprocating internal combustion engine application
       GT • Gas turbine application
       ST - Steam turbine/electric
       SH - Space heat application
       PH - Process heat application
       HBtu - High Btu for pipeline use
       mmcfd - Nominal extraction rate of landfill gas, million cubic feet per day
2. Also described in more detail in this report
3. Facility currently shut down
 Capacity and
 ADDlicatlonl
 1.7MW.IC
 1.3 MW, GT
 1.3MW, IC
 0.9 MW, GT
 1.3 MW, IC
 4 mmcfd, SH
 5 MW, IC
 9 MW. IC
 8 MW, IC
 3 mmcfd, PH
 SH
 50MW.ST + 3MW, GT
 PH
 PH
 IC
2 MW, IC

 1.1 mmcfd
HBtu
p irt ft

-------
      •  A description of gas extraction from the Stone 1 Landfill and its uses. Uses include
        fueling a cement kiln, process heat for metals refining, process drying of chalk powder,
        and fueling Degeneration by an 1C engine. Information is contained in Robinson, 1990.

Reports on these and many other British landfill gas projects are found in the U.K. Landfill Gas Energy
Users Bibliography (British Library Document Supply Center).

5.8 Other Supplemental Literature

Three supplemental texts are included in appendices L, M and N. These became available too late to
include them in preceding sections of the report.
The text The Economics of Gas Recovery Systems in the United States" by George Jansen, is included
as appendix L.  (This work was presented in Melbourne, Australia on February 27, 1992.)  It provides
information and perspective  on many issues covered earlier in this report from the viewpoint  of a
significant developer of landfill gas systems (Laidlaw Gas Systems).  In particular, additional information
is provided on internal combustion engine system economics, rate  of return criteria, recovery project
histories, and  energy  and  economic trends.  Appendix M presents the text  of "Waste Management of
North America, Inc. Landfill Gas Recovery Projects" by Michael Markham. This work was presented at
the SWANA 15th Annual International  Landfill Gas Symposium, March 24 to 26,  1992.  It documents
experience and operating philosophies of Waste Management of North America, Inc. (WMNA), the largest
U.S. operator of landfill gas energy systems, at its 25 U.S. energy projects.  Appendix N, "I-95 Landfill
Gas to Electricity Project Utilizing Caterpillar 3516 Engines" describes  a recently constructed facility using
Caterpillar 3516 engines, which are engines adapted for low-pressure gas, and particularly landfill gas,
use.
 PJG G640101A AOW

-------
                    6.  REVIEW, COMMENTARY, AND CONCLUSIONS
  This report  has presented case  studies of projects where landfill gas  has been  used, generally
  successfully, in energy applications. It has also attempted to present an overview of the  important issues
  regarding landfill gas energy uses, and (within existing constraints)  a brief review of  costs and other
  economic aspects.  Some major conclusions can be offered based on this report's review and case study
  work. Technical areas can be identified where work on obstacles appears most likely to advance landfill
  gas energy use. The findings of this report  also provide a context in which to review  suggestions (by
  others) for facilitating landfill gas energy use by addressing nontechnical barriers.

  6.1  Conclusions

  Major conclusions from this report are as follows:

       •  Landfill gas can be a satisfactory fuel for a wide variety of applications, and its  use in
          these applications provides environmental and conservation benefits.  Many types of
          energy equipment that  operate on  more "conventional" fuels can also operate on
          landfill gas.

       •  Some  reduction in the  energy output of conventional  equipment, of about 5  to 20
          percent compared to Hs output on  conventional fuels, is normally associated with
          landfill gas use.

       •  When landfill gas is used as a fuel,  its properties, unique nature, and particularly its
          contaminants, must be considered.  Many pitfalls are possible in landfill gas energy
          applications.  Especially  important are equipment damage from the gas contaminants,
          and gas supply problems such as shortages resulting from incorrectly estimating the
          availability of the gas.

       •   Cleanup stringency and  methods vary widely.  The necessary degree of landfill  gas
         cleanup has not been well established. Cleanup by methods such as refrigeration can
         be expensive, both economically and  in energy requirements.

       •  The optimum tradeoffs between cleanup stringency and the frequency of maintenance,
         such as oil changes, are  not well established.

       •  Collection technologies are developed but probably could be further improved.

       •  Methods of forecasting  gas availability  for new sites  are available  but could   be
         improved.

       •  Economics  vary greatly;  at some sites,  economics may be  excellent but at others,
         economics are a major limitation.  Economics now tend to preclude smaller scale uses
         and remote site uses where electric power sale prices are tow and there are no other
         convenient energy applications.

      •  Emission limits in some U.S. locations may also inhibit landfill gas energy uses despite
         an environmental balance sheet that would generally appear to be strongly positive.

The case studies of this report, comprising three reciprocating internal combustion engine sites, one gas
turbine site, a site combining interval combustion engines and space heating, and one boiler site, have
illustrated some  of the possible  applications  of landfill gas.  Recognize that these studies are only
•snapshots," representing a small  part of the total number of landfill gas energy projects and experience.
Nonetheless the  case studies illustrate some of the particular considerations regarding landfill gas. and
support the conclusions presented above.
  PJG

-------
  6.2  Further Needs

  Based on the above case studies and cited literature, further needs for landfill gas energy use appear to
  include (as a partial list)

       •  Examining ways to improve and standardize gas cleanup for specific applications.
       •  Examining further the tradeoffs  between approaches such  as  more stringent gas
          cleanup and maintenance measures such as more frequent oil changes.

       •  Examining further the optimum operating parameters, such as the best oil, coolant,
          and exhaust gas temperature for 1C engines.

       •  Examining and  documenting further the appropriate engine and other equipment
          design modifications to reduce current contaminant-related problems experienced with
          landfill gas use.

       •  Improving technology in ancillary areas that relate to energy uses, such as forecasting
          gas recoverability and improving gas collection efficiency and reliability.
       •  Developing and improving economic small-scale uses for the landfill gas.

       •  Developing further detailed documentation of  experienced problems, and attempted
          and successful solutions to them, to  benefit  the community of  present and future
          landfill gas users.

       •  Examining ways to reduce economic (and institutional) barriers to landfill gas energy
          applications. Further discussion of this issue is  presented below.

 6.3 Facilitating Landfill Gas Energy UM

 Increasing collection and energy use of landfill gas would have consequences considered positive, as
 outlined in earlier sections (this is also reflected in the  various regulations cited in this report  regarding
 landfill gas). Technical obstacles remain, and technical improvements as outlined above should obviously
 help  advance landfill gas uses.  Nontechnical barriers appear, however, to be as important as the
 technical. As illustrated in section 4, high costs can combine with low energy sale prices at specific sites
 to make energy applications of much landfill gas that is generated uneconomical.  Barriers can also be
 posed by other factors such as  local emissions limits.  Most gas generated by landfills is probably not yet
 being used for energy because  of such  reasons (although precise  statistics are not  available) with
 economics the dominant barrier.  Incentives have therefore been recently recommended (as opposed to
 approaches  such  as mandated  energy use).   They  were favored  by  expert groups such  as the
 participants in  the U.S.  Environmental Protection Agency/Japan Environment Agency Workshop on
 Methane  Emissions and Opportunities for Control (U.S.  EPA/JEA, 1991) and an earlier workshop by the
 U.S. Environmental Protection Agency and the U.S. Department of Agriculture (U.S. EPA/USDA, 1989).

Some regulatory incentives now exist; federal facilitation  is provided by tax credits under section 29 of the
Code of Federal  Regulations.  The examples of policies in Michigan and Illinois that result in  more
favorable prices to landfill gas fueled electric generation are mentioned in appendix D.  Some of the other
suggestions worth  noting that have been made for overcoming economic and other nontechnical barriers
are as follows:

      • Improving current federal tax credits and furthering state regulations benefitting landfill
        gas energy users (Workshop participant conclusions, U.S. EPA/JEA. 1991).

      •  Allowing greenhouse gas and NMOC emissions  "offsets'  for landfill gas energy use.
        (Conclusions of workshop participants, U.S. EPA/JEA, 1991).
  PJC3

-------
      •  Using environmental "balance sheets" for landfill gas energy conversion that consider
         the total picture: not only the secondary emissions that tend to be the current focus of
         local and other regulations, but also the wider benefits to the environment by reducing
         radiath/ely forcing gas and other emissions and conserving other energy resources.
         Workshop conclusions in U.S. EPA/JEA (1991), state that "incentives should reflect the
         environmental benefits that will accrue from the implementation of the technologies
         and practices.*
      •  Imposing a "methane tax" on decomposable waste that is  landfilled, as suggested in
         Augenstein (1990).  This would provide funding toward methane abatement, and could
         be  preferentially collectible if the methane were abated through energy  use.   This
         option is akin to the "carbon tax" that is suggested on fossil  fuels as a way of reducing
         their use and greenhouse CO2 emissions.

      •  Supporting landfill gas  energy uses  with a levy on  fossil fuel use (reflecting the
         emission consequences of fossil fuel  use) similar to the  British non-fossil-fuel-
         obligation (NFFO) (Richards and Aitchison, 1990)

      •  Creating goals for  nonfossil energy production (Workshop Participant  Conclusions,
         U.S. EPA/JEA, 1991).

Implementing any of these suggestions involves judgements on the valuation of various environmental
benefits, relative to costs, and policy decisions, that must be made elsewhere.  The pertinent factor to
note is  simply that  these approaches would appear appropriate as means for facilitating landfill gas
energy uses in the context of this report's findings.

-------
                                     REFERENCES
 American Gas Association (AGA).  1980.  Recovering Gas  from  Landfills:   Resale  Potential and
      Institutional Barriers. American Gas Association. Arlington, Virginia.
 Augenstein, D. 1990. Greenhouse Effect Contributions of United States Landfill Methane. Proceedings
      from the GRCDA 13th Annual  International Landfill Gas Symposium.  GRCDA/SWANA, Silver
      Spring, Maryland.
 Augenstein, D. and J. Pacey. 1991. Landfill Methane Models. Proceedings from the Technical Sessions
      of SWANA's 29th Annual International Solid Waste Exposition, Cincinnati *91.  SWANA, Silver
      Spring, Maryland. September.
 British Library Document Supply Center. Boston Spa, U.K. (undated) Biofuels. BRL 7. A bibliography.
      B. Series.
 Chadwick, C.E.  1989.  Application of Caterpillar Spark-Ignited Engines for  Landfill Gas.  Proceedings
      from the GRCDA 12th Annual  International Landfill Gas Symposium.  GRCDA/SWANA, Silver
      Spring, Maryland.
 Chadwick, C.E.  1990.  Reduced Power Requirements of Low Pressure Gas Reciprocating  Engines. Pre-
      Treatment of Landfill Gas.  Proceedings from the GRCDA 13th Annual International Landfill Gas
      Symposium. SWANA, Silver Spring, Maryland.
 Cortopassi, T., L. Toth, and T. Williams.   1986.  State-of-the-art in Landfill Gas Power Conversion.
      Proceedings from the GRCDA 9th International Landfill Gas Symposium.  SWANA, Silver Spring,
      Maryland.
 EMCON Associates, Cal Recovery Systems, and Gas Recovery Systems,  Inc.  1981.  Feasibility Study:
      Utilization of Landfill Gas for a Vehicle Fuel System. U.S. Department of Energy.  DE 83010622.
      January.
 EMCON Associates.  1982.  Methane Generation and Recovery From Landfills.  Second Edition, Ann
      Arbor Science. Ann Arbor, Michigan.
 Emerson, C.W. and L.W. Baker. 1991.  The California Landfill Gas Testing Program:  Summary and
      Evaluation of Results, and a Suggested Control Measure. Proceedings from the GRCDA/SWANA
      14th Annual International Landfill Gas Symposium. SWANA, Silver Spring, Maryland.
 Esbeck, D.W. 1989. Engine and Turbine Panel Presentation, Solar Turbines Incorporated. Proceedings
      from the GRCDA 12th Annual International Landfill Gas Symposium.  SWANA,  Silver Spring,
      Maryland.
 ETSU (Energy Technology Support Unit).  1989.  Landfill Gas Research  and Development Studies;
      Catvert and Stewartby Landfill Sites.  ETSU, United Kingdom Department of Energy, Oxfordshire,
      0X11, United Kingdom.
Gas Engineers Handbook. 1965. Industrial Press, New York.
Gas Research Institute (GRI): Landfill Methane Recovery. Part II: Gas Characterization. Final Report
      (1982). Gas Research Institute, Chicago.
Geyer, J.A.  1972.  Landfill  Decomposition Gases.  An  Annotated Bibliography.  U.S.  Environmental
      Protection  Agency,  Office of  Research and Monitoring.   Solid Waste  Research Laboratory,
      Cincinnati.  EPA SW 72-1-1 (NTIS PB 213487). June.
  PJG  GW0101A AOW

-------
 Gonzalez, J.G.  1987.  Selecting the Best Lubricant for Optimum Equipment Performance.  Papers and
      abstracts for the GRCOA 10th International Landfill Gas Symposium.  GRCDA/SWANA.  Silver
      Spring, Maryland.
 Government Advisory Associates.  1991-92 Methane Recovery From Landfill Yearbook.  Government
      Advisory Associates. New York, New York.
 Government  Advisory Associates (GAA).   1988-89 Methane  Recovery  from Landfill  Yearbook.
      Government Advisory Associates.  New York, New York.
 GRCDA.  1986.  Description of Olinda Facility. Proceedings from the GRCDA 9th International Landfill
      Gas Symposium, pages 212-214. SWANA. Silver Spring, Maryland.
 GRCDA/SWANA. 1989.   Engine and Turbine Panel Presentations.  Page 187 in Proceedings from the
      GRCDA 12th Annual International Landfill Gas Symposium. SWANA. Silver Spring, Maryland.
 Guter, K.J. and R.L. Neurenburg.  1986.  Michigan's Second Medium Btu Operation:  From Concept to
      implementation.   Proceedings from the GRCDA  9th  International  Landfill  Gas  Symposium.
      SWANA, Silver Spring, Maryland.
 Ham, R.K., K.K Heklmian, SI. Katten, W.J. Lockman and RJ. Lofy.  1979.  Recovery, Processing and
      Utilization of Gas from Sanitary Landfills (methanol, ammonia and area syntheses are discussed),
      EPA-600/2-79-001 (NTIS PB293165). February.
 Jansen, G.R.  1986.  The Economics of Landfill Gas Projects.   Proceedings from the  GRCDA 9th
      International Landfill Gas Symposium. SWANA.  Silver Spring, Maryland.
 Kakjjtan, P.  1990.  A Characterization of Municipal Solid Waste in the United States: 1990  Update.
      EPA-530-SW-90-042(NTISPB90-215112). June.
 Koch, W.R.  1986. A New Process for the Production of High-Btu gas.  Proceedings from the GRCDA
      9th Annual International Landfill Gas Symposium. GRCDA/SWANA. Silver Spring, Maryland.
 Leeper, J.  1986.  40 kW Fuel Cell Experiment  at Industry Hills.  Proceedings  from  the GRCDA
      9th International Landfill Gas Symposium. GRCDA/SWANA. Silver Spring, Maryland.
 Maxwell, G.  1989.  Reduced NOX Emissions from Waste Management's Landfill Gas Solar  Centaur
      Turbines.   Proceedings, Air and Waste Management Association's 82nd  Annual Meeting.
      Anaheim, California. June.
 McDonald, S. 1984. Medium Btu Landfill Gas Utilization at a Wastewater Treatment Plant.  Proceedings
      from the GRCDA 7th International Landfill Gas Symposium. SWANA. Silver Spring, Maryland.
 Myers, J.D. 1987. The Marina, California Landfill Gas Fueled Electric Power Project.  Proceedings of the
      GRCDA Annual International Solid Waste Symposium. SWANA.  Silver Spring, Maryland.

 Nielsen, D. 1984. Small Electric Generation Projects. Proceedings from the GRCDA 7th International
      Landfill Gas Symposium. SWANA. Silver Spring, Maryland.
 Piccot, S. and M. Saeger.  1990. National- and State-level Emissions Estimates of Radiatively Important
     Trace  Gases (RITGs) from Anthropogenic Sources.  EPA-600/8-90-073 (NTIS  PB91-103572).
     October.
 Richards, K.  and  E.M. Artchlson.  1990.  Landfill Gas:  Energy and Environmental Issues.  Conference
     Proceedings, Landfill Gas:  Energy and Environment *90. United Kingdom Department of Energy
     and United Kingdom Department of Environment. Oxfordshire, United Kingdom.
Robinson,  M.G.   1990.   Landfill Gas; Its use as  a  Fuel for Process  Firing and Power Generation.
     Conference Proceedings, Landfill Gas:  Energy and Environment "90. United Kingdom Department
     of Energy and United Kingdom Department of Environment. Oxfordshire, United Kingdom.
  PJG GM0101A AOW

-------
 Rosen, J. 1990. Running on Methane. Mechanical Engineering Magazine. May.

 Sandelli, G.J. 1992. Demonstration of Fuel Cells to Recover Energy from Landfill Gas, Phase I Final
       Report: Conceptual Study, EPA-600/R-92-007 (NTIS PB92-137520). January.

 Schlotthauer, M. 1991.  Gas Conditioning Key to Success in Turbine Combustion Systems Using Landfill
       Gas Fuels.  GRCDA/SWANA's 14th Annual Landfill Gas Symposium.  SWANA, Silver Spring,
       Maryland.

 Thometoe, S.A.  1992.   Landfill Gas Recovery/Utilization—Options and  Economics.  Sixteenth Annual
       Symposium on Energy from Btomass and Wastes. Institute of Gas Technology, Chicago.

 Thometoe, S.A. and R.L Peer. 1991. EPA's Global Climate Change Program—Global Landfill Methane.
       Air and Waste Management Association Annual Meeting. Vancouver, B.C. June.

 U.S. EPA.  1991.  Office of Air Quality Planning and Standards.  Air Emissions from Municipal Solid
       Waste   Landfills—Background   Information  for  Proposed   Standards   and   Guidelines
       EPA-450/3-90-011 a (NTIS PB91-197061). March.

 U.S. EPA/JEA.  1991.  (U.S. Environmental Protection Agency in cooperation with Japan Environmental
       Agency).    Methane  Emissions  and  Opportunities  for  Control.   Workshop  results  of
       Intergovernmental Panel on Climate Change.  U.S. Environmental Protection Agency, Washington
       D.C. EPA/400/9-90/007.

 U.S. EPA/USDA.  1989.  (United States Environmental Protection Agency in cooperation with the U.S.
       Department of Agriculture).   Workshop held on greenhouse  gas emissions  from  agriculture.
       December 12-14.  U.S. Environmental Protection Agency, Washington, D.C.

 Vaglia, R.  1989.  Operating Experience with Superior Gas Engines on Landfill Gas. Proceedings from
      the GRCDA 12th Annual International Landfill Gas Symposium. SWANA. Silver Spring, Maryland.
      June.

 Van HeuH. R. and  J.  Pacey.   1987.   The Gas Field Test:  Design,  Installation and  Maintenance.
      Proceedings of the GRCDA Annual International Solid Waste Symposium. SWANA.  Silver Spring,
      Maryland.

 Watson, J.R.   1990.  Pre-Treatment of Landfill Gas.  Proceedings from  the GRCDA 13th Annual
      International Landfill Gas Symposium. SWANA. Silver Spring, Maryland.

Wans.  R.A. 1987. The Justification of Landfill Gas Recovery for Electric Generation. Submitted Papers
     and Abstracts for the GRCDA 10th International Landfill Gas Symposium. SWANA.  Silver Spring,
     Maryland.

Yeung, D.C. 1984. Small-scale Medium Btu Project, Cinnaminson, New  Jersey.  Proceedings from the
     GRCDA 7th International  Landfill Gas Symposium. SWANA. Silver Spring, Maryland.
 PJG G640101A AOW

-------
                                        APPENDIX A
                 ESTIMATING GAS AVAILABILITY FOR ENERGY USES
 Knowledge of the gas quantity likely to be available over time is critical for determining possible and
 appropriate energy uses and sizing equipment; this appendix presents a limited discussion of approaches
 to prediction.  Note that the  available gas is the generated gas, multiplied by the recovery efficiency
 (confusion often exists on this issue, or at least with the terminology).

 Although existing knowledge is far from complete, for much of the waste in the U.S. the methane
 generation potential has been estimated as likely to be between 1 and 2 cubic feet per pound of total
 waste on a dry basis (in metric terms, 62 to 125 liters/kilogram, [I/Kg]) as stated in Augenstein and Pacey
 (1991).  Similar estimates are given by Bariaz and Ham (1990) and Bariaz et al.  (1990).  Most of this gas
 will be generated over a period of 10 to 40 years after filling; this also corresponds to various rules of
 thumb that methane generation rates from wastes during the decade or so after placement may range
 from 0.04 to 0.2 cubic feet per pound of dry waste per year (EMCON, 1982;  Van Heuit, 1986). The
 recoverability of this generated methane for energy use is most likely to lie between 50 and 90 percent.

 Generalizations such as  above leave wide bounds on possible gas availability,  and are of little value in
 sizing energy equipment, but the gas availability can be determined more precisely (and more usefully) by
 modeling, field  pilot tests, or  a combination of these.  Without an in-place extraction system, or
 information from sources such as pilot  tests, modeling techniques using  waste placement and other
 appropriate data can still be used to develop de  novo estimates of gas generation over time. The
 advantage of model projections is a cost typically less than 10 percent of field testing approaches. Work
 by various investigators has resulted in the development of several such models for predicting methane
 recoverability (EMCON, 1982; Van Heutt, 1986; Zison, 1990; and Augenstein and Pacey, 1991). Gas
 generation does appear to be predictable,  within limits, by the models but, unfortunately the error limits
 are large; generation predictions  are consequently often expressed as a range (commonly upper and
 lower bounds are separated by  a factor of two).  The imprecisions that affect forecasts of gas availability
 come from several sources, including the difficulties in assessing the  types and quantities of waste that
 were initially landfilled, temperature,  moisture content, and many other critical variables (as listed in
 Augenstein and Pacey, 1991). Work to refine available models does not appear to have been extensive,
 although such work is now being undertaken as described in Thomeloe and Peer, 1991.

 In addition to assessing the likely gas generation by modeling, pilot extraction tests may also be
 conducted over a limited portion of the landfill area (EMCON [1982], Biezer et al. [1985], and Woodfill and
 Bamum [1985]).  Such tests are also inherently and sometimes seriously imprecise H extrapolations for
the total landfill are made based on a few wells.  Sources of error include, for example, inability to readily
determine the volume from which a well, or groups of wells, is actually extracting, and the variabilities of
gas generation over an inherently heterogeneous  fill. Interpretations of models  and small-scale  field
extraction tests  require  correction factors that  tend to  be site-specific  and often have judgement
components.
Once a gas extraction system has been  installed (see next) and has been functioning long enough for a
steady-state near-maximum recovery rate to be reached (depending on tuning  and other factors, this is
usually a few months),  gas  recoverability information will  be reasonably precise and the available
recovery results can be  used to  refine  model predictions into the future.  Models can be refined as
discussed in Zison (1990) and Augenstein and Pacey (1991).

-------
                            REFERENCES TO APPENDIX A
 Augenstein, 0. and J. Pacey. 1991. Landfill Methane Models. Proceedings from the Technical Sessions
      of SWANA's 29th Annual International Solid Waste Exposition, Cincinnati 91. SWANA. Silver
      Spring, Maryland. September.

 Bartaz, M.A. and R.K. Ham. 1990.  The Use of Mass Balances for Calculation of the Methane Potential of
      Fresh and Anaerobically  Decomposed Refuse.   Proceedings from the  GRCDA 13th  Annual
      International Landfill Gas Symposium. SWANA. Silver Spring. Maryland.

 Barlaz,  MA,  R.K. Ham, and D.M. Schaefer.  1990.  Methane  Production from Municipal Refuse:  A
      Review of Enhancement Techniques and Microbial Dynamics.  Critical Reviews in  Environmental
      Control, 19. (This paper points out laboratory support for a yield near 2 cubic feet of methane per
      pound,  but that the maximum measured methane recovery from a landfill is, to date, near 1 cubic
      foot per pound.)
 Biezer, M.B., T.D. Wright, and D.E. Weaver.  1985. A Field Test Program for Determining Landfill Gas
      Recovery Feasibility. Proceedings From  the GRCDA 8th International Landfill Gas Symposium.
      GRCDA/SWANA. Silver Spring, Maryland.
 EMCON Associates. 1982.  Methane Generation and Recovery From Landfills.  Second Edition, Ann
      Arbor Science. Ann Arbor, Michigan.
 Thometoe, S.A. and R.L Peer. 1991.  EPA's Global Climate Change Program—Global Landfill Methane.
      Air and Waste Management Association Annual Meeting. Vancouver, B.C.  June.

 Van Heuit, R.  1986.   Estimating Landfill Gas Yields.  Proceedings from the GRCDA 9th Annual
      International Landfill Gas Symposium. GRCDA/SWANA. 1986.
 Woodfill, PA and M.F.  Bamum.  1985. Management of Gas Extraction Systems. Proceedings from the
      GRCDA 8th International LandfiO Gas Symposium.  GRCDA/SWANA. Silver Spring, Maryland.
Zison. S.  1990.  Landfill Gas Production Curves:  Myth vs. Reality.  Presentation at SWANA Annual
      Meeting. Vancouver, B.C.  SWANA, Silver Spring, Maryland.

-------
                                         APPENDIX B
                                GAS EXTRACTION SYSTEMS
  Gas extraction systems are a complex topic; only a brief overview is given in this appendix.  Much
  literature is available and ample detail can be found elsewhere (some starting points can be found in
  EMCON, 1982, and Poland, 1987).

  The overall concern of the gas energy user is that the gas system will continue to deliver a reliable supply
  of gas, in the needed quantity, and that problems with the gas system will not reduce the output of, nor
  shut down the energy equipment.  Collection efficiency is also a concern.

  As an overview, gas extraction systems suitable for energy applications typically employ vertical wells or
  horizontal trenches to collect the  gas from the mass of the landfilled waste.  These are connected by
  laterals to  a main header that ultimately carries the gas to the energy equipment.  Vacuum is nearly
  always used to extract the gas.   Several design considerations are important in assuring that  the gas
  system functions correctly, including the  most basic one of sizing pipes adequately for gas flow, and
  allowing for subsidence effects, draining condensate from lines to prevent its buildup, and allowance for
  accessibility to the system for leak detection and repairing breaks.

  The overall extraction efficiency is typically affected by well spacing, and the permeability of the cover
  layer, typically the final cover.  Collection  efficiency is variously increased by reducing well spacing, and
  decreasing the permeability of the cover layers. It must be emphasized, however, that if the cover is at all
  permeable (and It almost always is), collection efficiency cannot, even in theory, be 100 percent with well
  systems as currently designed: economic limits on well spacing and other factors limit collection efficiency
 to levels that are  more typically between 50 and 90 percent.  Well spacing and depth are important
 issues; readers reviewing literature win  note that the concept of "radius of influence' is often cited with
 respect to spacing wells.  Within this radius,  gas  is  assumed to be extracted by the well: outside this
 radius gas is assumed to be not extracted. However, problems with this concept have also been pointed
 out, in that  the pressure influence  of extraction changes gradually with the radius, and that the radius of
 influence is therefore difficult to define and apply (EMCON, 1982).  (This comment is presented so that
 readers will be aware that differing opinions exist on both the radius of influence topic and others.)

 Once the gas system Is installed. It is adjusted (tuned") to maximize recovery.  Typical tuning involves
 gradually increasing extraction rates from wells over time, until falling wellhead methane levels  indicate
 that air entrainment through the landfill surface, and into the collected gas, is significant.  (Too much air
 entrainment limits  gas extraction since  it  can alter  methane  generation rates unpredictabty  and
 undesirably, reduce gas usability for energy because of dilution, or even cause the landfill to ignite.) If
 methane  production falls  too far,  the well must be throttled.   The lag time between adjustment and
 attainment of the final equilibrium composition is significant,  and overshoots and undershoots  are
 common  enough that tuning must  often continue until several interstitial void volumes of gas  are
 extracted, or for several months.

 A more recent approach, which has only had limited application, uses the pressure drop across the cover
 as an indicator of extraction efficiency and to enable adjustments (Zison, 1990).  This has the advantage
 in principle of enabling more accurate and rapid adjustments.

 Oversizing the energy equipment because of too-optimistic gas availability estimates is one of the more
 common problems in landfill gas energy projects: gas estimates in  such cases usually come from
 modeling or field pilot tests made without a full gas recovery system in place.  When energy equipment is
then installed (concurrently with the necessary gas system) the gas supply is found to be less than is
  PJG G640101A.AOW

-------
 needed. Installing the gas recovery system, determining availability as outlined above, and then installing
 the energy equipment would appear to be a preferred course to avoid such problems.

 This has been very limited summary of gas extraction equipment, practice, and associated issues; the
 reader is referred to EMCON (1982), Poland (1987), and U.S. EPA (1991) for more detailed descriptions
 of extraction systems.  The topic of collection systems and practice is important because difficulties with
 collection systems are also among the most common causes of problems with energy facilities.
                            REFERENCES TO APPENDIX B
 EMCON Associates.  1982. Methane Generation and Recovery From Landfills.  Second Edition. Ann
      Arbor Science.  Ann Arbor, Michigan.

 Poland, R.J. 1987. Collection Systems for Landfill Gas Recovery and Control—One Size May Not Fit All.
      Submitted  Papers and Abstracts for the GRCDA 10th International  Landfill  Gas Symposium.
      SWANA. Silver Spring, Maryland.

 U.S. EPA.  1991. Office of Air Quality Planning and Standards.  Air Emissions from Municipal Solid
      Waste   Landfills—Background   Information   for   Proposed   Standards   and  Guidelines.
      EPA 450/3-90-011a (NTIS PB91-197061).  March.
Zison, S.  1990.  Landfill Gas Production Curves:  Myth vs. Reality.  Presentation at SWANA Annual
      Meeting. Vancouver, B.C. SWANA. Silver Spring, Maryland.
PJG G640101A.AOW                       B - 2

-------
                                        APPENDIX C
        COMMENTS ON ENVIRONMENTAL AND CONSERVATION ASPECTS OF
                               LANDFILL GAS ENERGY USE
  Landfill gas energy use clearly has economic consequences, which in successful cases will include
  benefits to both energy producers and recipients of the energy.  Using landfill gas for energy is also
  associated with significant environmental consequences, considered predominantly beneficial; these are
  best seen from the standpoint of the consequences if landfill gas emissions are not controlled.

  If control is not attempted, the generation/emission of landfill gas poses some immediate hazards.  Risks
  include fire and explosion from migrating gas, at the landfill itself, or In structures on adjacent properties,
  as well documented in Geyer, 1972 and U.S. EPA, 1991. The gas poses asphyxiation risks, since it may
  enter culverts, or other enclosed spaces.  Concerns about these hazards were the impetus for many of
  the eariy gas control systems; many were simply barriers, such as trenches, to prevent gas migration,
  although some included extraction.

  The next concerns that developed, first in areas of the country with air quality problems (such as the Los
  Angeles Basin), were those regarding emissions  of the nonmethane organic  compounds (NMOCs),
  reactive organic gases (ROGs), or ozone precursors contained in  the landfill gas. Various estimates of
  the magnitude of these emissions have been presented, but at whatever magnitude may be correct, they
  are significant (U.S. EPA.  1991).  Concern over these has risen steadily  to the present  and further
 discussion of air quality impacts and regulations is presented elsewhere in this report.
 The final concern regarding landfill  gas, from a global standpoint and over larger time periods, is its
 potential contribution to changes in the earth's climate (Thometoe and  Peer, 1990; Augenstein. 1990).
 Interest in this issue has increased sharply over the  last few years.  This interest relates to the continuing
 atmospheric buildup  of 'greenhouse' gases, of which one of the most important is methane. Whatever
 the  details, tt  is expected that if current trends continue some climate  change  should occur (although
 timing and magnitude are uncertain) and some consequences could ultimately be serious (Houghton and
 Woodwell, 1989).

 Landfill methane's significance to climate change arises because the radiative forcing ("heat blanketing")
 effect of methane, as a greenhouse gas, is about  25 times that of an equal volume of CC^.  Enough
 waste is landfilled annually in the U.S. that conversion of even a modest fraction of the landfilled organic
 material to methane in landfill gas, which is then evolved to the atmosphere, contributes significantly to
 the ongoing increase of global  'heat blanketing" or radiative forcing that  is due to greenhouse gas
 buildup.   Estimated landfill methane emissions in references  that include  U.S.  EPA (1991) and
 Augenstein (1990) typically  range from 3 to 20 teragrams per year (Tg/year) for U.S. landfill methane
 emissions to the atmosphere.  Based on atmospheric modeling,  even  a tower estimated range of
 emissions of U.S. landfill methane of 3 to 8 Tg/year  could be making a difference of 1 to 2 percent  in the
 earth's annual increase in total greenhouse gas radiative forcing (Augenstein,  1990).

 The  collection and destruction  of landfill methane, whether through energy use or other routes,
 ameliorates  hazards  and nuisances mentioned earlier and obviously  prevents its emission into the
 atmosphere; it results in a reduction in NMOC emissions, and any global warming consequence that
would otherwise  occur from that methane.  Emitted methane's greenhouse  potency—compared to the
C02 that would result from burning that same  methane—depends on atmospheric residence time, and
other factors.  Considered from  the  standpoint of time  intervals of up to 40 years, the combustion of
methane to CO2 has been  calculated to reduce the greenhouse  impact (radiative forcing) that would
  PJG

-------
 otherwise occur from it by over 90 percent (Augenstein, 1990).  In that work the economics of landfill
 methane abatement (without necessarily using the gas for energy) were found quite attractive (1 to
 10 percent as expensive per unit radiative forcing benefit) compared to other approaches—photovoltaic or
 nuclear for coat—whose costs could be identified (Augenstein, 1990).  Similar conclusions, that landfill
 methane abatement is one  of the tower cost United States approaches to address potential climate
 change problems, have been reached by a recent study by the National Academy of Sciences (1991).

 While landfill methane extraction and abatement appears attractive as an approach to global warming to
 the extent that it can be  practiced—an economic "fix" to the landfill methane component of the
 problem—using methane for energy has additional benefits.  The  energy use itsetf will typically offset
 fossil fuel use elsewhere,  reducing net CO2 emissions to the atmosphere (fossil fuels, usually oil, are the
 "swing" fuels whose use is most typically displaced).  When energy and other methane recovery-related
 revenue depend on efficient collection of  the gas that is generated, it is also reasonable to assume that
 recipients of the resulting revenue will make efforts to maximize collection efficiency.  The economic
 incentives likely facilitate the attainment of environmental benefits (as reduced methane emissions).

 Using landfill gas for energy also uses an asset that would otherwise be wasted, and the beneficial
 energy use therefore represents conservation. Although estimates of landfill gas energy potential cited in
 section 1 were "only" about 0.2 to 1 percent of the energy total used in the U.S., this quantity of energy is
 still highly significant by most standards—equivalent to the total energy requirement of half a million to
 possibly well over a million U.S. citizens.

 Although the results of using landfill gas for energy can be considered primarily beneficial, some negative
 consequences can be of concern. These are principally the emissions from the energy uses; the most
 significant negative impacts (affected by regulations) are oxides of nitrogen (NOx) and carbon monoxide
 (CO); NOx  is the most important and can be a limiting factor. On balance, however, the benefits of landfill
 gas energy use do  appear  to outweigh the negatives.  Emissions and other regulatory issues are
 addressed in elsewhere in this report.
                             REFERENCES TO APPENDIX C
Augenstein, D. 1990. Greenhouse Effect Contributions of United States Landfill Methane. Proceedings
      from the GRCDA 13th Annual International Landfill Gas Symposium.  GRCDA/SWANA, Silver
      Spring, Maryland.
Geyer, JA  1972.  Landfill Decomposition Gases.  An Annotated Bibliography.  US.  Environmental
      Protection Agency,  Office of Research and  Monitoring.   Solid Waste Research Laboratory,
      Cincinnati. EPA SW 72-1 -1 (NTISPB 213487). June.

Houghton, RA and G.M. Woodwell.  1989. Global Climatic Change. Scientific American.  April.

National Academy  of Sciences. 1991.  Policy Implications of Global Wanning. National Academy of
      Sciences. Washington, O.C.  April.
Thomeloe, SA and R.L Peer.  1990.  Landfill Gas and the Greenhouse  Effect.  Text in Landfill Gas,
      Energy and  Environment "90.  U.K. Department of Energy and Department of the Environment.
      Harwell, Oxfordshire.

U.S. EPA  1991.  Office of Air Quality Planning and Standards.  Air Emissions from Municipal Solid
      Waste   Landfills—Background   Information  for  Proposed  Standards   and  Guidelines.
      EPA-450/3-90-011 a (NTIS PB91 -197061). March.
 PJG G640101A.AOW                       C-2

-------
                                         APPENDIX D
                    REGULATORY ISSUES WITH LANDFILL GAS USE
 Regulations are another area of  complexity,  for which this appendix presents a brief overview with
 historical notes.  Regulations in several areas significantly affect landfill gas energy use. Some of these
 regulations concern hazard and nuisance  abatement, and air pollutant emissions reduction.  Another
 pertinent set of regulations are statutes, both state and federal, providing incentives to facilitate energy
 applications and outlets for the produced energy.

 In the history of landfill gas  control regulations,  regulations initially addressed the landfill-gas-related
 dangers and nuisances (discussed in appendix C).  These were followed by regulation, primarily local,
 that addressed ROGs.  (Earliest federal regulations did not normally directly affect landfills, except, for
 example, as they favored landfilling over previous disposal methods for health and safety).

 Some of  the most  pertinent current legislation on the  national level is  that  of recently  enacted
 amendments to the federal Clean Air Act. Details  of the proposed regulations,  which as applied to
 landfills are being finalized, are documented (Federal Register. May 30,1991).  The primary purpose of
 this legislation is to reduce emissions of NMOCs (ozone precursors), although other important objectives
 exist (U.S. EPA, 1991).  It is expected as a consequence of the proposed regulations that most of those
 landfills capable of supporting energy systems, but that are now without any controls, will be required to
 install gas recovery systems.

 The proposed regulations prescribe the methods for determining whether landfill gas recovery is required
 at specific sites, and the degree of NMOC abatement to be obtained with the recovered landfill gas. In
 very brief overview, landfills established to emit 150 Mg or more a year of NMOC's are required to install
 controls.  Energy conversion  equipment such as gas turbines, 1C engines, and boilers may serve for
 control H equipment accomplishes 98 percent destruction of NMOC's or has 20 ppm  or less of NMOC's at
 the outlet. Performance testing is  required to verify the degree of control. These are but summaries of
 some key points; readers should consult U.S. EPA (1991) for full detail.

 Many  other  state  and  local  regulations  exist  regarding other landfill-gas-related issues,  including
 condensate disposal, effectiveness of gas migration control, and so on (Maxwell, 1989; Peterson, 1991).
 Discussion cannot be presented here; the reader should simply be aware that such  regulations exist and
 are very likely to have significant impact on energy applications.

 Some  local emission  regulations and  regulatory guidelines are tending toward greater stringency than
 federal standards, as exemplified by California's  recent proposed guidelines (California Air Resources
 Board, 1991).  California's draft guidelines propose that energy conversion approaches must meet that
 state's definition of best available control technology (BACT).  Further discussion is omitted here except
to. note that such stringency may limit equipment and approaches (and  could tend to reduce the amount
of landfill gas energy use).

The benefits of landfill gas energy use (see appendix C), in combination with a general congressional and
state intent to facilitate small-scale energy use, have resulted in legislation that helps facilitate market
acceptance for electricity produced from landfill gas (and similar sources) as well as legislation providing
credits and various incentives.

The provisions of the Public Utility Regulatory Policies Act (PURPA) are very important to those producing
electricity from landfill gas.  PURPA allows producers of landfill-gas-fueled electricity in the U.S. to sell to
utilities at the utility's •avoided' cost, that is the sum of costs the utility would otherwise experience in
  PJG GB40101A AOW

-------
 terms of fuel, new plant construction, and other categories to produce the power.  Provisions of federal
 law are  somewhat general with numerous accounting and costing methods possible;  states such as
 California have somewhat standardized the purchase agreements with "standard offers" (Hale, 1989) that
 simplify the negotiation process.

 The congressional wish to encourage alternative energy has also resulted in federal tax credit legislation
 (Hatch 1991).  This legislation provides a variable U.S. income tax abatement, or offset, credit with a
 current (in 1991) value near 0.85/MMBtu for gas collected and sold for energy applications.  The energy
 application must be profitable for the credits to be realized, and there are other constraints.

 Some state legislation to facilitate landfill gas energy use also exists.  Michigan  law. for example,
 specifies an avoided cost formula for sale of electric power by a landfill gas facility to  a public utility that
 gives a favorably high price; Illinois specifies that a utility must buy electricity generated from landfill gas
 in a county at the same average rate at which it sells it to customers in the county (Greenberg, 1990).
 Regarding the impact on landfill gas energy use, the control regulations, and in particular the Clean Air
 Act regulations, will probably result in the installation of gas recovery systems at many  landfills that could
 support energy systems.  The gas system required for energy could  thus be regarded as a "given" and in
 the energy economics would  not  necessarily need to be accounted for as an  expense against energy
 production.  The emission limits under the federal Clean Air Act were based on a review  of currently
 attainable equipment performance.

 Regarding legislation that facilitates landfill gas energy use.  the energy use tax credits provide a benefit
 that can  favor various energy applications, for example by offsetting gas collection  expenses.  State
 provisions are also obviously beneficial where they exist.  PURPA provisions facilitate sale acceptance by
 grids of the output of electrical cogenerators (note, however, that the sale price now available for landfill-
 gas-cogenerated electricity has tended to  fall for reasons including falling  avoided fuel costs, utility
 generating overcapacity, and a hotly competitive auction market in which other cogeneratten  sources bid
 to sell power to utility grids).

 The restrictions on energy equipment emissions, on the other hand, as applied or developing  in many
 areas in the U.S.,  imply significant additional expenses on landfill  gas energy  uses.  These  emission
 restrictions characteristically treat the landfill gas emissions as a tie novo source.  This does not consider.
 as part of an overall assessment, the environmental benefits such as more efficient NMOC  emission
 control and other  consequences  that  occur due to  energy applications.   In particular,  the energy
 conservation, and also the offset effect of landfill gas energy use in reducing net emission of radiatively
forcing gases, is typically not now considered by state or local regulators.

-------
                            REFERENCES TO APPENDIX D
California Air Resources Board.  1991.  Air Pollution Control at Resource Recovery Facilities.  1991
      Update (Draft Document as of May 1991, contains proposed guidelines.  Final expected in early
      1992).

Federal Register,  Vol.56, No. 104, Thursday, May30, 1991.   Standards of  Performance  for New
      Stationary Sources and Guidelines for Control of Existing  Sources:   Municipal Solid Waste
      Landfills. Part III, p. 24468.

Greenberg, F.  1990.  Selling Electricity to Utilities.  Proceedings from the GRCOA 13th Annual
      International Landfill Gas Symposium. SWANA, Silver Spring. Maryland.

Hale, B.   1989.   California's Alternative Energy Program and  Landfill Gas to  Energy  Projects.
      Proceedings from the 12th GRCDA Annual International Landfill on Symposium.  SWANA, Silver
      Spring, Maryland.

Hatch, R.  1991. The Federal Tax Credit for Non-conventional Fuels: Its Status and Role in the Landfill
      Gas Industry.  GRCDA/SWANA's 14th  Annual International Landfill Gas Symposium.  SWANA,
      Silver Spring, Maryland.

Maxwell, G.  1989. Disposal Options for Landfill Gas Condensate.  Proceedings from the 12th Annual
      International Landfill Gas Symposium. SWANA.  Silver Spring, Maryland.

Peterson, E. 1991.  Pending Subtitle D Regulations and Their Effect on Landfill Gas Issues. Proceedings
      from  SWANA's 14th Annual International Landfill Gas Symposium.  SWANA,  Silver Spring,
      Maryland.

U.S. EPA.   1991.  Office of Air Quality Planning and Standards.  Air Emissions from Municipal  Solid
      Waste   Landfills—Background   Information   for  Proposed  Standards  and  Guidelines.
      EPA-450/3-90-011a(NTISPB91-197061).  March.
 PJG G6401P1A AOW

-------
                                       APPENDIX E
                             GAS COMPOSITION ANALYSIS
 In contrast to the case with more "conventtonar energy sources, landfill gas users may need to check the
 composition of their fuel more or less regularly.  Methane and energy content can change as the
 consequence of extraction procedure, or other factors. Oxygen in the gas can indicate leaks that need
 repair.  Gas system tuning" is often needed to provide a gas stream of appropriate quality to keep energy
 equipment running, and this tuning can require frequent well-by-well analysis.  In addition the gas will
 contain a range of contaminants, whose level varies with landfill, and over time. As composition can have
 important energy consequences, gas composition analysis is reviewed briefly here.

 Methane and oxygen content can be determined by various techniques of which the most common is a
 portable meter combining thermal-conductivity-based methane analysis with electrochemical-cell oxygen
 analysis (manufacturers include GasTech and MSA).  This equipment has the advantage  of speed and
 portability.  Greater precision is available through gas chromatography techniques.  This equipment  is
 less portable and less frequently used, most often to sample the total gas stream supplied to the energy
 application. A discussion of methodologies for methane and oxygen content analysis is presented in Van
 Heuit, 1983.  One "bottom-line' indication of gas quality is of heat  of combustion, which may be checked
 by on-line calorimetry.

 Compositional analyses for gas trace components (all components other than methane, carbon dioxide,
 nitrogen and oxygen) down to extremely low levels can be accomplished by a variety of  methods
 including gas chromatography/mass spectroscopy (for example as described in Gas Research Institute,
 1982).  Chlorinated hydrocarbons are usually the greatest concern because of  equipment corrosion
 potential (discussed elsewhere in this report); techniques for analyzing for these with portable equipment
 are described in Zimmerman et al. (1985) and independent outside laboratories recommended by engine
 manufacturers for chlorine content analyses are given in Chadwick (1989).

This is largely presented to provide awareness that  analysis may be required to assure performance.
 Interested readers should seek further information  from literature, equipment manufacturers and/or
contact others with expertise on this issue.
 PJG GWomiA anw

-------
                           REFERENCES TO APPENDIX E
Chadwick, C.E.  1989.  Application of Caterpillar Spark-Ignited Engines for Landfill Gas.  Proceedings
     from the GRCDA 12th Annual International Landfill Gas Symposium.  GRCOA/SWANA, Silver
     Spring, Maryland.

Gas Research Institute (GRI): Landfill Methane Recovery.  Part II: Gas Characterization.  Final Report
     (1982). Gas Research Institute, Chicago.

Van HeuH, R.  1983.  Extraction, Metering, and  Monitoring Equipment.  Proceedings of the GRCDA 6th
     International Landfill Gas Symposium. SWANA. Silver Spring. Maryland.

Zimmerman, R.E., R. Stetter. L. Alpeter, and N. Flynn.  1985. On-line Monitoring for Trace Compounds in
     High Btu Gas Streams. Proceedings from the GRCDA 8th International Landfill Gas Symposium.
     SWANA, Silver Spring, Maryland.

-------
                                        APPENDIX F
      COST, REVENUE, AND OTHER ECONOMIC COMPONENTS: DISCUSSION
 Readers must recognize how site-and-situation specific landfill gas energy economics can be; the site-to-
 site variation in capital and operating cost were reviewed in the main text.  Development or presentation
 of detailed process economics are beyond this report's scope.  It is possible, and can be helpful, however,
 to review some more commonly encountered components of energy systems (whether electrical or other)
 with some discussion, where possible, of cost basis and reasons for variation over typically experienced
 ranges. The discussion to follow addresses, in turn, capital and related costs, operating and maintenance
 costs, and revenues and other benefits.

 Capital cost Hems
 •Capital cost" for equipment can have various definitions.  It is convenient here to use the installed cost,
 defined as including the total burden of engineering, installation, and permitting as well as other cost (as
 well as these can be estimated and allocated) to arrive at the total cost for a functional plant equipment
 component.  Capital cost will be expressed either for the total for a site, or in terms of the normal capacity
 units of the equipment, such as cost per kW or Btu/hr. (For interested readers wishing to translate cost
 components from one basis to another, note that 1 dm of  landfill gas corresponds to about 2  to 3
 kilowatts, 20 to 25 pounds per hour of steam, or about 500,000 to 650,000 Btu per day of space heat.)
 Capital costs for frequently encountered items or categories using the definition above are as follows:
 Gas system. Gas system costs will be likely to lie between $200 and $2,000 per standard cubic foot per
 minute (scfm) of landfill gas, based on recent SWANA and U.S. EPA cost data (SWANA, 1991; U.S. EPA,
 1991).  ($1.00/scfm landfill gas will correspond to about $0.40 to 050 per kW of electrical capacity  or
 $0.035 to $0.05 per pound per hour of steam, or $1.30 to $1.50 per million Btus per day of process heat
 when energy equipment is continuously on-line.  Thus for the cited figures it may be worked out that the
 gas system costs may lie roughly at $80 to $lOOO/kW electric capacity, $7,000 to $100,000 per pound per
 hour of process steam, or $250 to $3,000 per million Btu per hour of peak space heating capacity.) The
 costs tend to rise relatively slowly with size, that is, gas systems become more economic per unit
 throughput as scale  increases.
 This cost might or might not be allocated to the energy application, depending on whether the system
 would be required in any event without the energy system (see discussion in appendix 0 for Clean Air Act
 implications).

 Gas cleanup.  Landfill gas cleanup system costs can be extremely variable and, based on experienced
 costs, would appear to range from as low as $5 to well over $100 per cubic foot of landfill gas flow per
 minute (corresponding roughly to $10  to $500/kW for electrical applications).  Part of the reason for this
 variability Is that needs vary by site.  Also, in the  absence of knowledge about what type or degree of
 cleanup is most cost-effective, a wide range of equipment is applied.
 Condensate removal and treatment.  The costs for this,  on an  incremental basis, can be small if the
condensate can  be  returned to the landfill or combined with leachate flow, to which it adds a  minor
volumetric increment. However handling costs may be higher in many areas where separate condensate
 handling and treatment is required. No figures are  immediately available but discussions of the issue are
presented in  Maxwell  (1989) and it is well for  potential energy users to recognize this as a potential
expense; It  is a cost component incurred if gas recovery is mandated, whether or not energy recovery is
  PJG GB40101A AOW

-------
  practiced.  Like the cost of the gas system itself, is a cost that might be a "given" and not necessarily
  expensed against conversion.

  Energy equipment
  Electric generation-reciprocating internal combustion (1C) engines.  Electrical generation using these
  engines  has been to date the application for the majority of U.S. sites.  Costs for complete,  new
  reciprocating 1C engine-generator sets would appear to lie in the range of $1000-2500/kW.  This includes
  the basic genset package (engine, turbocharger if used, and control systems) but excludes costs such as
  those for interconnects presented elsewhere in this capital cost summary. Costs per kW fall with size, or
  can be reduced if equipment is acquired used,  as it has been for many sites.

  Electrical generation using gas turbines. For combustion gas turbine-generator sets costs would appear
  to lie between $2,000 and $3,000 per kilowatt.
  Fuel cells future technologies." As a potential electrical generation technology, fuel cells come off wed in
  terms of  capital costs, with cost estimated to be under $2000/kW.  However attainment of this will require
  further manufacturing cost reduction from current levels,  and validation of  operation characteristics on
  landfill gas, which is planned (Sandelli, 1992).

  Interconnects with electrical utility grids (specific to electrical generation). These are another item whose
  costs can vary widely; the range of variation within this report's case studies is from about $20/kW
  (reported for Marina) to $500/kW  (reported for Prince George's County).  The  reasons for variation
  include whether the interconnect is one or two-way, the voltage step-up needed for power sale, the scale,
  and of particular importance as many landfill sites are remote, the distance power lines must be run from
 the generation site.

  Boilers.   Capital cost of boilers, where they  are used, win vary with size, steam pressure and other
 factors.  Full cost data for boilers are not available, and landfill gas boiler applications are few, but for one
 example  (a case study described in this report), capital costs  are about $25,000 per  1,000 pounds of
 steam per hour, including all ancillary  control  equipment.  This  is but a  single case, and it is likely that
 boiler costs per unit capacity wilt vary substantially with circumstances. Qualifiers to cost issues are that
 the case study cost included a building (not always a needed component) and that pipelining costs will be
 extra (they are an additional $6,000 per 1,000 pounds of steam per hour for the case study site, on top of
 the cited $25,000  per 1,000 pounds of steam per hour).  Pipelining costs will probably be  significant
 because appropriate users of steam, If available, will often be some distance from the landfill.

 As an overview, the capital cost of a boiler will be 10 to 20 percent of an engine-generator set that uses
 landfill gas at the same rate, and with  appropriate situations very attractive returns are posstote on their
 relatively  low capital investment.   Specific capital  cost information on boilers will be available from
 vendors.
 Capital costs of other energy technologies. Numerous other applications are possible for landfill gas (for
 example process and space heating, vehicle  fueling, and other applications as mentioned above) but
 capital costs are so situation-specific that cost estimates wDI not  be attempted here. The capital costs for
 many of these technologies fueled by conventional fuels are available from  manufacturers  and other
 sources. The recommended approach would be to obtain these costs on more conventional fuel sources
 and then add to them the additional costs estimated as specific to landfill gas fueling.

 Other capital cost categories. There are, in addition to cost items above, other situation specific and quite
 frequently major capital costs.  These can include rights to the  landfill gas, or rights to  favorable power
 contracts. Other cost categories include pipeline costs and the costs for providing on-site utilities such as
water at remote  sites. Power contracts and landfill gas rights can be evaluated  in a present worth type of
evaluation, in terms of the extra return component over time expected from gas production or contract
Other comment  will be omitted on these costs because of their variability except to note that such  cost
components may exist and comprise large fractions of total capital cost.
                                              r  "

-------
 Capital-related fixed costs
 The capital-related fixed costs are charges related to the investment which can include interest on debt,
 taxes, insurance, depreciation, and the like.  They are the part of the energy cost that results directly from
 the capital investment, and are proportional  to  the  capital investment (which  is why lower capital
 investment is desirable). As capital costs are highly variable, fixed costs are likewise variable; in fact on a
 percentage or ratio  basis the fixed  costs will be even more variable than capital costs (the greater
 variability relating to interest rate variation and other factors).

 (Note that fixed costs continue whether the facility is producing energy or not.  Problems such as energy
 equipment or gas system breakdown or other factors that result in lowered energy revenue can result in
 failure to cover fixed costs, and serious financial problems.  These can include, if not loss of investment,
 loan defaults or worse.)

 Operating costs
 Only brief comment on operating costs  will be given here.  Detailed, publicly available data are limited
 (and the case studies of  this report may add somewhat to the existing  body of publicly available
 information).

 Operating and maintenance costs can either be viewed against a baseline of operation of a similar energy
 application on more conventional fuels, or as the cost of operation reported by the equipment operators in
 terms of units  of output. In contrast to capital costs, which can be broken out to a fair level of detail,
 lumped  operating costs are frequently reported for all of the equipment in the aggregate in an energy
 application. They tend to be closely proportional to the energy production.

 Gas system.  Some of the factors in operation of gas systems are discussed in Augenstein and Pacey
 (1991).  Variables include landfill size, porosity of cover, frequency of tuning required, and objectives (i.e.
 pipeline  or low Btu gas extraction).  Operation and maintenance costs will  range from  a low value of
 around $30,000 per year to well over $200,000 per year.
 Engine operation costs. The cost of operation and  maintenance of reciprocating  1C engines on landfill
 gas, compared to operation on more conventional fuels, is of interest because of the extent to which such
 engines  are used.

 One industry observer has commented1 that the operating and maintenance costs of landfill gas fueled
 engines  increase very roughly by 25 percent compared to more conventional fuels.  Clearly, the  extra
 cost will  vary from engine to engine and site to she, (as It obviously does for engines operated by that
 organization  as  documented  in Vaglia,  1989).   In  addition  relative cost  will differ with cleanup
 effectiveness.  Nonetheless this number is one useful guideline estimated  by  an organization with
 extensive experience in such operation.
 The operation and maintenance costs of engines have also been reported as cents per kWh of electrical
 output.   One reference (Jansen, 1986)  presents an averaged cost ol 133 cents per kilowatt hour for
 generation scales of  500 to 1000 kW  based on Gas Recovery  Systems'  (now part of Laidlaw Gas
 Systems) experience, of which 0.0035/kWh is labor and the rest cost of an on-slte operator. This cost,
 updated  to the  present, would imply a cost of about $0.02/kWh.  One engine manufacturer has recently
detailed estimated life-cycle maintenance costs for an engine (its G7042GSI) on natural gas in deriving
 1.1 megawatts  of  generation under "severe" operating conditions, defined as operating at  maximum
continuous recommended load2.  These costs, amounting to $0.0045 per kWh, do not include on-site
operator  labor, or costs for maintenance of other aspects such as gas cleanup, that would be required at
a landfill  gas facility.  Operator labor at an assumed  burdened cost of $50/hr full time  and an engine
service factor of 80% would add $0.013/kWh  to give a total of $O.Ol75/kWh.  The gross totals of the
1  Personal communication, Stan Zson. Padfc Energy, to Susan Thometoe and Don Augenstein, March 1991.
2  Personal communication. Jeff Bafis. Waukesha. June 1991.
  PJG GM0101A AOW

-------
  Waukesha estimate and Jansen (1986) both imply current costs near 2 cents per kilowatt hour, which
  would seem a representative benchmark for a scale near one megawatt.  However variability in such
  estimates is illustrated in that, between the estimates, both the labor and  equipment  maintenance
  components vary threefold and are reversed.
  Even for smaller electrical operations, it has been found to date that full-time on-site operators are stHI
  required. Labor costs for such smaller scale operation are such that few electrical projects at 500 kW or
  less can presently be viable.
  Interconnect  Often associated with electric power generation is the cost for an interconnect.  If the
  interconnect is utility financed, charges are levied for both  operation  and maintenance, and the utility's
  fixed charges and return may be a total of about 2 percent of the capital cost per month.
  Operation and maintenance costs for other equipment.  There have been relatively few reported data for
  landfill gas fueling of boilers, kilns, process heat applications and the like.  In several cases for which
  information is available (which include a boiler and space heating application presented in this report) no
  operation and maintenance differences or cost associated with them could be identified.  Operation and
  maintenance costs for such specialty applications should in any case be derivable from the equipment on
  conventional fuel with add-ons if established as necessary for operation on landfill gas.
  In general, operation and maintenance costs are specific to scale, equipment, and site, and factors such
  as gas contamination.   They are dependent on the diligence with which  maintenance is performed.
  Compared to  a basis of trouble-free  operation on "clean" or pipeline  gas, these costs will obviously
  escalate sharply on a unit energy output basis when operating problems as  described earlier  are
  encountered, which both increase costs and reduce output.
  Royalties. Royalties are  typically a variable cost levied as a fraction of the total gross energy revenue.
 they are often zero and otherwise most typically in the range of 5 to 20 percent.
 In theory, for a viable project, the sum of costs above should be below revenue, discussed next.

 Revenue Components
 Benefits that a project accrues can include cash sales of energy, costs avoided through displacement of
 energy purchases, as well as ancillary benefits such as gas abatement and tax credits.  A brief discussion
 of these follows.
 Cash sales of energy: electric power. Although electric power sales to the grid will be possible at the
 majority of  sites, the revenue  for power sold varies widely.  The "averaged* power sale rate for
 continuous, constant-rate  production that would occur uninterrupted over a year varies over the U.S. from
 a low of approximately 2 cents per kWh (areas such as the Pacific Northwest), to over 10 cents (Hawaii).
 Avoided costs: electric power. When landfill-gas-generated electricity is used in lieu of utility power from
 the grid, electric utility retail costs are avoided. These "avoided cost' benefits are almost invariably higher
 than the price for which the power could be sold to the utility.  Avoided costs may be from 25 percent to
 more than twice the price for direct sale of power to the utility depending on whether the utility requires
 capacity or has  a large  amount  of expensive generation operating.  Averaged avoided costs for a
 continuously  generated electrical power stream consumed by a large user, depending on U.S. location,
 will typically lie between 4 and somewhat over 10 cents per kWh. In any case, the benefit wPI typically be
 greater than for sale to the grid.
 Other energy sale prices.  The sale price received for forms of energy other than electricity Is typically set
 by the price  of competing fuels.  For example, at a current oil price of $20/barrel, or  the equivalent
 pipeline gas cost of slightly over $3/1,000 cubic feet, the sale price realized for landfill gas might be near
$3/1.000 cubic feet of methane content.  In practice the sale price will vary depending on local price of
competing pipeline gas. and other additional costs or effects specific  to landfill gas, but the percentage
variation in gas sale price across the U.S. would typically  be much less than Is true of electricity.  If a
  o ift ft

-------
 product such as steam or hot water is sold, the price might be 20 to 50 percent higher on a Btu basis than
 the local price of competing fuels to reflect efficiency and cost of conversion.
 Tax credit benefits.  The Federal alternative energy tax credit is a benefit that may be available to an
 independent entity ("provider) owning and operating the gas system, and providing the energy to a user
 (user).  The provider must be less than half owned by the gas user.  A reduction of the provider's federal
 income tax, up to the provider's tax total, is obtained under a formula based on the price of oil. The credit
 is currently close to  $0.85 per million  Btus.  Its effect on energy economics may be realized in various
 ways; it is most often realized through the provider's subsidy  of costs for gas system construction and
 operation that would otherwise be a component of the energy cost. This is a major benefit, amounting to
 slightly  over $O.Oi/kWh for electrical generation.  It would appear to have facilitated a large number of
 projects.

 Other miscellaneous benefits: gas  system.  Although  the  gas control system  may be mandated by
 regulations whether or not the energy is used, it is often convenient for the entity operating the energy
 system  to also participate in operating the gas system. This is because staff are  available, and gas flow
 and composition need to be analyzed  for both gas system and energy equipment operation.  When this
 occurs,  a major fraction of gas system operation costs that would otherwise be experienced (see above)
 can be avoided; the allocation of  such  savings is typically a  matter of  negotiation  among  project
 participants.

 Total costs and overall economics

 Total costs of a project  including all components would be determined by summing capital, operating, and
 maintenance costs in categories above.  Economics would be determined by comparing the total of these
costs to the sum of the benefits.  This  report generally avoids presenting "the" economics by application,
because of wide variation  and also partly for lack of data; the specific case of reported capital costs of
electric power facilities versus capacity has been addressed in the main text.
 PJG GM0101A AOW
                                             r  r

-------
                            REFERENCES TO APPENDIX F
 Augenstein, D. and J. Pacey. 1991. Landfill Methane Models. Proceedings from the Technical Sessions
      of SWANA's 29th Annual International Solid  Waste Exposition, Cincinnati <91.  SWANA, Silver
      Spring, Maryland. September.

 Jansen, G.R.  1986.  The Economics of Landfill Gas Projects.  Proceedings from the GRCDA 9th
      International Landfill Gas Symposium. SWANA. Silver Spring, Maryland.

 Maxwell, G.  1989.  Disposal Options for Landfill Gas Condensate.  Proceedings from the 12th Annual
      International Landfill Gas Symposium. SWANA. Silver Spring, Maryland.

 Sandelfi, G.J. 1992.  Demonstration of Fuel Cells to Recover Energy From Landfill Gas, Phase I Final
      Report: Conceptual Study.  EPA-600-R-92-007. (NTIS PB92-137520). January.

 SWANA (Solid Waste Association of North America). 1991.  Comments Submitted August 1991.  The
      Local Government Solid Waste Action Coalition (SWAC):  The National League of Cities (NLC),
      The National Association of Counties (NACo), The Solid Waste Association of North America
      (SWANA).   On  the  U.S. EPA's  Standards of Performance for New  Stationary  Sources and
      Guidelines  for Control  of Existing Sources—Municipal Solid Waste Landfills.  Available from
      SWANA, Silver Spring, Maryland.

 U.S. EPA.  1991.  Office of Air Quality Planning  and Standards.  Air Emissions from Municipal Solid
      Waste  Landfills—Background  Information   for   Proposed   Standards   and  Guidelines.
      EPA-45(K3-90-011a (NTIS PB91-197061). March.
Vaglia, R.  1989.  Operating Experience with Superior Gas Engines on Landfill Gas.  Proceedings from
      the GRCDA 12th Annual International Landfill Gas Symposium. SWANA. Silver Spring, Maryland.
      June.

-------
                                                                           X	X	X	X	X
                                                                                                                                 1


                                                                                                                                 m
                                                                                                                                 p~
                                                                                                                                 m
                                                                                                                                 o

                                                                                                                                 so
                                                                                                                                 •—«
                                                                                                                                 o
                                                                                                                                    CT
N
                                                                                                        PACIFIC  ENERGY

                                                                                                          t. IM>»«1CICM


                                                                                                           uniMo not run
                                                                                                              OUT ruNT
                                                                                                          OUT. SAMIMT UMOnu.
                                                                                                                        or

-------
                                  APPENDIX H
     • c i r i«  i • * • a r
                  EQUIPMENT DETAILS, OTAY FACILITY, PACIFIC ENERGY
NAME OF PROJECT:   Otay Power Station

OWNER:             Pacific Energy

BRIEF DESCRIPTION:

The  Otay Power Station,  located  in Southern California on the County of San
Diego's Otay  landfill  in Chula Vista,  generates electric power using gas
recovered from the  landfill.  The landfill  gas (containing about 47%
methane)  fuels a  single  internal combustion engine/generator to produce up
to 1.7  megawatts  (MW)  of net power which  is sold to San Diego Gas &
Electric.  The plant began operation in December 1986 and has a typical
availability  factor (on  line time)  of  over  90% including scheduled
maintenance.


KEY PROJECT DATA

     Project  Location	Otay, California
     Landfill Name   	Otay Sanitary Landfill
     Landfill Owner   	County  of San Diego
     Gross Power	1,900 KW
     On site  Power  Use	51 to 10%
     Net Power to Grid	1,700 KW
     Power Purchaser	San  Diego Gas  t Electric
     Eguiv. Homes Served	1,700 (maximum)
     Barrels of Oil Saved/yr	22,000  Barrels  (maximum)
     Fuel Used	Landfill  Gas
     Landfill Size	525 Acres
     Landfill Depth	90 feet (current  average)
     Landfill Fill Rate    	500,000 tons per  yr.
     Landfill Opened	1966
     Landfill Closure	beyond year 2000
     Number of Gas Wells	Thirty-two
     Number of Engine-Generators..One
     Type of  Engine   	Gas fired, internal combustion,  16 Cyl
     Type of  Generator    	1,875 XW  4,160 Volt, synchronous
     Type of Transformer	4,160 Volt to 12,000 Volt,  step-up
     Project Start-Up	December,  1986
    Project Life  (Estimated)	20 years
    Project Operator/Owner	Pacific Energy
    Project Employees  Total	One
    Project Employees  1st Shift..One
    Project Employees  2nd Shift..Not required, automated operation
    Project Employees  3rd Shift..Not required,'automated operation


XPANSION PLANS:

ne Plant will  be  expanded to incorporate  an additional engine-generator
nd related equipment to  double power output.  Construction is to begin
3°ut April 1st.   Start-up is scheduled for  summer 1991.


                 m BcuJ»»on*. Cemn»rc». Calilomia 90040.1213) 7K-I133 FAXBi3;72*47T2

-------
Jlflfflsfc
     r*c t r,c r • c • • r
                             OTA* POWER STATION (Key Components)


       MOTOR CONTROL CENTER  fMCC)
       Contain* starter* and controls for all electrical actors at the power plant.
       Including:  Gas compressor, air compressor,  gas cooler,  water cooler, building
       fan, etc.

       GENERATOR SWITCH GEAR PANEL
       Houses instruments and controls for the plant's generator (4160 Volt, 3 phase,
       60  Hz).

       AUTOMATIC DIALER
       Provides automatic "dial-up" or page alert notification  to plant operators in
       the event of a plant shut-down.  The system  is  programmed to provide a voice
       synthesized message alerting the operator which component initiated the shut-
       down.

       DATA COLLECTION COMPUTER
       Receives and stores information from the plant's gas  chroma tograph,  as well as
       various transducers and thermocouples located throughout the plant.   Computer
       compiles various information and reports on plant production.   All  data and
       reports produced at the plant can be accessed via a phone line  link up to
       Pacific Energy's headquarters office.

       AIR COMPRESSORS f?\
       Provides compressed air to operate plant instruments, pneumatic valves,
       pneumatic pumps and for engine start-up.

       GAS COMPRESSOR
       Draws gas from landfill at a typical vacuum of  10" to 20"  water column and
       discharges gas at 100 psig to the engine.  Electrical motor driven.   150
       horsepower.  Two stage reciprocating.

       ENGINE
       Internal combustion.   16 cylinders.   Turbo-charged.  2650 Brake  horsepower.
       13,194 cubic inch displacement.  900 RPH.  85-90  psig inlet gas pressure.

       ENGINE CONTROL PANEL
       Houses instrumentation and controls for Cooper  superior  "Clean  Burn*  engine.

       GENERATOR
       Produces 1875 Kilowatts at 4160 Volts.  3 phase.   Single Bearing.
       Synchronous.   900 RPM.

       CAS  CYLINDERS
       Contains Helium (Carrier gas)  and reference gas mixture  (Span gas) ,  for
       calibrating the plant's gas chromatograph which measures and records  the
       percent of Methane (CH4),  Carbon Dioxide (CO2), Nitrogen (N2) ,  Oxygen (02);
       also calculates heating value  (BTU/CF) .

       CAS  FILTER — INLET
       Removes particulate and water  from inlet gas to compressor.

       ENGINE OIL FILTERS  f21
       Filters designed to remove oil particulate down to 10 to 15 microns.
                                     of fresh oil for the plant's int.rnal combustion
      engine.  1600 gallon.  Manually operated.


      KS^SgyStSS  caused oil from the plant '. internal combustion
      engine.  1600 gallon.  Manually operated.

      WATER STORAGE TANK
      5000 gallon capacity.

      SUBSTATION                                           ,.    -    _   ...
      owned and maintained by Pacific Energy.   Steps-up voltage from Pacific
      Sn!rgy*»pS!ir Plant from 4160 Volt, to 12.000 Volt, to match SDCtE's
      transmission lines receiving  the power.   Station contains main transformer,
      auxiliary transformer, air switches, and power measurement meters.

   p __ , , rne.-v- OSS for Wo»hi-.7»r Boulevard Commerce CoWormo 90040 r2J*"2S-J/3S TAJf f?J3) 725-977?

-------
                                        APPENDIX I

                        PG&E  POWER  PURCHASE  RATES, MARINA-
    Pacific tosBRdBtetrteCoapaay       TTBeaieStreet
                                       San Fnncsco.CA 94106
                                       415/972-7000
             ENERGY PRICES FOR QUALIFYING FACILITIES EFFECTIVE MAT I. 1990 - JULY 31.  1190
 Th« energy price* applicable to purchases by PGIE from qualifying facilities «re shown belo*.  They
 ere the product of the weighted-average utility electric generation (UEG) natural gas rate and the
 Incremental Energy Ratt* plus an adjustment for the revenue requirement for Cash Working Capital, tne
 (eotnermal Adder and the Variable DIM Adder.  The Incremental Energy Rates and the Variable OIK Adder
 •ere adopted by the California Public Utilities Commission in Decision 89-12-015.  The Geothermal
 Adder was adopted In Resolution No. E-3139. dated July 19. 1989.   The revenue requirement for Cain
 Working Capital is calculated in accordance Kith Decision S9-12-057.  The average UEG gas rate '»
 based on the most recently adopted forecast of UEG volumes in Decision 90-04-021. the current uEC
 transportation tariff as filed In Advice Ne. 1586-6 and the) natural gas commodity charge to core-elect
 customers on the date of posting.
                                              REVENUE
                                            REQUIREMENT
                                             FOR CASH
                                              WORKING
                                              CAPITAL
INCREMENTAL
ENERGY »ATE
   ii/kH
 WITH JlMf.QF.
 DELIVEBT ne-»IM;»

   •oak
   Partial-Peak
   Off-Peak
  •Super Off-Peak

 WITHOUT TIMF-OF-
 DELIVERY METERTN6:

   Seasonal Average
   (Period A)

 FOOTNOTES:
                      Blu/kWh*
                         (1)
   9.290
   1.04$
   8.542
   7.747
   1.141
AVERAGE
U!6 MTE
S/MMBtu
   (2)
 3.3532
 3.3532
 3.3S32
 3.3532
 J/kWh
  (3)
0.00012
0.00012
0.00011
0.00010
GEOTHERMAL  VARIABLE
  ADDER"" QtM ADDER
  J/kWh       S/kWh
   (4)         (5)
                                          ENERGY
                                          PURCHASE
                                          PRICE'"
                S/kWh
0.0004117
0.0004187
0.0004187
0.0004187
O.OOZ328
0.002328
0.002328
0.002328
 3.3S32     0.00011     0.0004187    0.002328
0.034013
0.033189
0.031495
0.028819
                                                                 0.031852
           FEBIOP

              PEAK:

      PARTIAL-PEAK:


         OFF-PEAR:
                       NAT
      1  -  OCTOBER  31
      fPeriod Al
Noon

8:30 a.
8:00 p.

9:30 p.
5:00 a.
5:00 a.
1:00 p.m.

Noon
9:30 p.m.

1:00 a.m.
8:30 a.m.
1:00 a.m.
  NOVEMBER 1 • APRIL 30
       (Period 81

           Rone
  8:30 a.m.  • 9:30 p.m.

  9:30 p.m.  - 1:00 a.m.
  5:00 a.m.  - 8:30 a.m.
  5:00 a.m.  - 1:00 a.m.
               Monday • Friday, eicept holidays

               Monday • Friday, except holidays
               Monday - Friday, except holidays

               Monday • Friday, exceot nolieays
               Monday • Friday, except holidays
               Saturday. Sunday and nolioays
   SUPER OFF-PEAK:    1:00 a.m.  • 5:00 a.m.     1:00 a.m.  -  5:00 a.m.    All days

(Holidays  include New Tear's Day. Washington's Birthday,  "eswrtal  Day.  Independence Day. Labor Day.
Veterans Day. Thanksgiving Day.  and Christmas Day.)

  ••Incremental Energy Rate? are derived from PGIE's marg-nal  energy  costs.

 •••The energy purchase price excludes the  applicable ene-;y  line  loss  adjustment factors.  As ordered
    by Ordering Paragraph Ne. 12(j) of Decision No. 82-12-:20.  this figure is  currently 1.0 for
    transmission and  primary Interconnection voltage lane's, and for  secondary distribution is as
    follows:
                                          Period A          Period  8
              Peak
              Partial-Peak
              Off-Peak
              Super Off-Peak
                      1.0140
                      1.0131
                      1.0093
                      1.0093
                           1.0119
                           1.0087
                           1.0087
••••On April 10. 1990.  PSIE  submitted Advice No. 1282-E-A  to  supersede  Advice  No. 1282-E and to
    propose a Gee thermal  Adder of $0.0004S!9/kWh.  Advice  No.  1282-E-A  has  yet  to be approved by tne
    CPUC.  PG&E has requested specific CPUC authorization  to  apply  the  S0.0004519/ktfh aooer to en*-;,
    payments for variable-priced energy purchased en and a'ter May  1.  1990.
TAR AOS40S p. 1

-------
                                APPENDIX J

                  SPECIFICATIONS FOR CLEAVER-BROOKS BOILER
rooks
     Cleav
                           Packaged Boiler
                         . STEAM  OR HOT WATER
                           OIL, GAS OR COMBINATION FIRED
     COMPACT
     EFFICIENT
     PERFORMANCE PROVED
 UNEOUALED  FUEL ECONOMY:  Four
 pass, forced draft construction: efficient
 burner design:
  Guaranteed  minimum  80%  fueUo-
  steam  efficiency from 25 to  100% of
  rating on either gas or oil fuels.
  Guaranteed  minimum  fueMo«steam
  efficiency at 100% of rating is 82.0%
  with gas firing and 83.0% with oil firing.

EASY MAINTENANCE: Hinged or davited
doors; modular control panel, retractable
burner nozzle.

QUIET: Sound levels are lower than strict
hospital and  school standards  due to
unique caseless fan design. Less than 68
db in high fire — less than 85 db in  low
fire when measured  on the "A" scale.

HEATING SURFACE: 3500 sq. ft. on the
fireside — 3800 sq. ft. on the waterside.
        AUTOMATIC,  SAFE:  Eye level control
        panel: centralized combustion  controls;
        modulated firing;  electronic  flame
        safeguards.

        FUEL CONTROL: Precise metering  of
        fuel via special metering cam.

        AIR CONTROL: Unique rotary damper for
        accurate metering of combustion air.

        CLEAN  FIRING: Accurate air-fuel ratios
        throughout  the modulating  range.  CB
        designed air compressor, and efficient oil
        or gas burner  design.

        PACKAGED: A  complete unit  from a
        single  source. Cleaver-Brooks  designs.
        builds, tests and ships to your job site
        ready for quick hook-up. Starting service
        assures peak on-the-job  performance.

-------
STEAM  BOILERS  DIMENSIONS  AND  RATINGS
                                 (15  LB.  AND 150 LB.  STEAM)
                                                                  Rfl-ftF-RD

                                             U^	=-*..
      LENGTH
                                   ELECTRICAL
                                   SERVICE
                                   CONNECTIONS
                 NOTE:  DIMENSIONS MUST BE
                 CONFIRMED FOR CONSTRUCTION
                                                                                             W
     83?" ........................... A...25--11"
     "***" '••••••••••••••»•            B   21 *• 3**
     SjUiSTI? «*.••••• ..... ";;;;;;;;;;; c .'.'.' 2i'- 2"
     Front Head Extension ......         n      99"
     Rear Head Extension ............ ! ! " C " '    27"
     Front Ring Fig. to Nozzle (15& ISO Ib.).. f '.'.'.   128"
     WIDTHS
     Overall .............             I   118»
     Base. Inside .........
     c.m.r to outside Hinge....;;;;;;;;; G;;
     HEIGHTS
                                                   MINIMUM CLEARANCES
                                                   Rear Door Swing	oo   «.. 5..
                                                   Front Door Swing ...              EE    «• n«>
                                                   Tube Remove). Rear	"	& " tg.",0,..
                                                   Tube Removal. Front	i.^GG".' 18'- 4"

                                                   ""NIMUM BOILER ROOM LENGTH
                                                   DOOR SWING AND TUBE RBMOVAL
                                                   Rear of Boiler	             •*   en. ...
                                                   Front of Boiler	i].'.";	Up"' AA'ln"
                                                   Thru Window or Doorway	\', | ;no' |; 34'-8"

                                                   WEIGHT IN POUNDS
                                                   Normal Water Capacity	27.790
                                                  Approx. Ship. Wgt. 15 Ib	82 000
                                                  Approx. Ship. Wgt. ISO Ib	'.'.'. 53*600
                                                  Approx. Ship. Wgt. 200 Ib	 f* ™
 Base to Steam Outlet".'.'.'.'.'.'.'.'.'.'.'.'.'.'f'" *v'iv'
 Height of Base	'. Q." ;;    ig«

 BOILER CONNECTIONS
 Feedwater. Right end Left 	8 ... 2H"
 Auxiliary Connection	2... 114"
 Low Pressure (IS Ib. only|
 Steam Nozzle	u   12"FLt
 Drain. Front and Rear	fl!;; 2"

 High Pressure (ISO Ib. only)
 Surface Biowofr, Top C	T... 1"
 Steam Nozzle	;	Y ... 8"FL ft
 Slowdown. Front and Rear 	W... 2"
  Connections threaded unless
  indicated - Fig. 1  - ISO Ib. ANSI
            Fig. tt - 300 Ib. ANSI

VENT STACK
Diameter (flanged connection)	88... 24"
                                                     CAPACITY
                                                     Rated capacity in Ib*. etaam/hr. (212 F)   27 600
                                                     BTU output 1 1 000 BTU/hr.) ...... .....   26 780
                                                     EDR steam gross ...................  11l!eOO
                                                     FUa  CONSUMPTION
                                                     GasCFH
                                                       1000 ITU-natural ................. 33 BOO
                                                     Gas (therms per hr.|
                                                     Light Oil GPH
                                                     Heavy Oil GPH
                                                    POWER REQUIREMENTS
                                                    Blower motor ...................... 50 HP
                                                    Oil Pump - Light Oil  ...............  i HP
                                                    Oil Pump - Heavy Oil .............. * HP
                                                    Air Compressor (Oil Firing Only) ..... 7h HP

                                                    MINIMUM REGULATED GAS PRESSURE
                                                    Standard Train .............. . ...... 73" ivc
                                                    ltd Train (Former FIA) .............. 73" WC
                                                    FM Train ......... . ................ jy ^g
                                    GUARANTEES AND TESTS
 :FICIENCY - The CB 800 HP packaged boiler is goer-
 d to operate et e minimum fueMo-steam efficiency of
 -r greater over the ooereting renge.

 OP TESTS - The packeged boiler shall receive factory
  by the manufacturer  to cheek  construction
 ion.
   All  tests may be witnessed by purchaser at his
   own expense and upon sufficient notice.
                                                 3. STARTING SERVICE - After boiler installnion  is com-
                                                 plated, e field representative will start the boiler and train
                                                 the operator.  This service is not to exceed two consecutive
                                                 days. Any additional starting instruction or service required
                                                 by the purchaser or ultimate owner will be charged at pre-
                                                 vailing rates.

                                                 Extra service time requested by the purchaser or caused by
                                                 incomplete  installation work or other factors not a pert of
                                                 the Company's responsibility will  be charged to the pur.
                                                 chaser at prevailing rates for labor and expense.

-------
August 1990
            APPENDIX K

UNITED KINGDOM CASE STUDIES
BEST  PRACTICE  PROGRAMME
New   Practice  —Final   Profile
Protect Obfectiv*
To demonsirale (he feasibility energy saving and
commercial advantages ot using landlill-gas-
lueiied spark igmiion  engines to  generate
electricity in parallel with the national distribution
network

Potential UMTI
Remote or rural landfill sites witnoul easy access
to direct consumers ot landliii gas

Investment Cost
Stewartbv C418.500
Replicators £464.000
(1987 prices)

Savings Achieved
Stewartby C15B.OOO/year
Replicators C99 400 - C118 900
(1987 prices)

Payback Period
Slewartby: 24 years
Replicators 3.2-4.7 years

Project Summary
in this protect, three 275 kW spark ignition engines
fuelled by landfill gas were installed at a landfill site
ai Slewartby in Bedfordshire They are used to
generate over 66 million kWh/year ot electricity
the power generated being sold at peak periods to
the London Brick Company system and at other
times to Eastern Electricity. A small proportion of
the power was used m-house The protect was
prompted both by the incentive to harness the
      energy in the environmentally controlled landfill
      gas at the site and by the success ot early on-site
      experiments with the use ot landfill gas for power
      generation

      Host Organisation
      Shanks & McEwan (Southern) Ltd
      Woodside House
      Church Road
      Woburn Sands
      Milton Keynes
      MK17 8TA

      Monitoring Contractor
      Ewbank Preece Ltd
      Prudential House
      North Street
      Brighton
      Sussex
      BN1 1RZ
      Tel No: 0273 724533
      Telex No: 878102
      Mr MR Homsby

      Equipment Manufacturer
      Dorman Diesels Lid
      TixaliRoad
      Stafford
      ST16 3UB
      Tel No: 0785 223141
      Telex No: 31656
      Fax No: 0785 215110
      Mr OL Jones
      Mr JJLusby
ELECTRICITY


GENERATION


USING


LANDFILL  GAS
                                                                                        .>      '
                                                                                        •»....»  *•
                                                                                       •* . . ./.  f
                                                                                  fc'firw Ktflrlrnr* Offlrr
Landfill gas power generation facility and abstraction plant

-------
 Th« Stewartby Site
 The  Siewartby  site of  Shanks  & McEwan
 (Southern) Ltd (SMS) occupies a total o( 74 ha and
 had an original void volume of  10  million m3. It
 receives approximately 1.000 tonnes of waste per
 day transported by rail trom London, together witrt
 some local waste. Adjacent  to the  site is the
 London   Brick   Company   (LBC)  Siewartby
 brickworks  which  produced about  12 million
 bncks/week in 1987
 SMS s initial involvement m the development of
 landfill gas extraction m 1979 led to  gas from five
 wells being used to tire bricks in a nearby LBC kiln
 This  was  followed  by  an earty  study of the
 feasibility of electricity  generation  based  on a
 Rolls-Royce B81G 8-cytinder gas engine driving a
 75 kVHV generator.

 Deployment
 The success of  the initial electricity generation
 trials lea to the installation of three  Oorman type
 12STCWG  spark ignition engines coupled to
 ail-cooed generators.
 Bom vertical  ana  horizontal wells have  been
 installed to  extract the landfill gas. and more are
 planned for me tulure. Knock-out drums tor  water
 removal are located in each of the polyethylene
 lines trom  the  landfill site,  two on  the longer
 (500m) line ana one on each of the other lines The
 gas  is  passed  through  pre-lilters pnor  to
 compression.
 The compressor, a single, constant  displacement
 vane-type   unit  manufactured by  Hammond
 Engineering Ltd. is driven by a 45 kW electric
Control pan*
motor It is rated to supply 680 mVh against 1.3
bar g. The compressed gas passes through an
altercooler. baffle water separator, chiller and fine
litters before being  supplied  to  the  adjacent
engine house Any surplus gas is flared.
Each   turbo-charged.   4-stroke.    12-cytinder.
Vee-torm engine unit s rated at 275 kW output at
1000 rpm when running on landfill gas Because of
(he lower calorific  value of this fuel, the  rating
quoted is some 11% below the engines normal
rating when operating on natural gas  The units are
cooled  by   radiators  mounted on me  same
DM
framework as the engines, and the air used is
drawn trom outside the engine room  Twin, paper
element air filters are provided tor each cylinder
bank, and each engine is fitted with a single
exhaust ducted horizontally to exit  through  the
engine-room wall.
The  engines are directly coupled  to Newage
Stamford air-cooled generators These are rated
at 350 kVKV and generate at  415 V The entire
generation plant is housed m a  single-roomed
engine house which also contains control panels
and the lubricating oil tank. The units are designed
to  operate   unattended,   so  comprehensive
interlocks are provided to trip the units in the event
of low gas pressure, spit-back m  the carburettor.
low  oil  pressure, high engine  temperature or
engine  overspeed.  All engine trip  circuits  are
linked by telephone to a 24-nour call-out system
Electricity is supplied at 415 V tor m- house use and
a  small proportion ot the power   exported  is
supplied at the same voltage  to LBC  The main
export power is. however stepped up to 6 6 kv via
a single transformer. During the  daytime all this
power s taken by the LBC system  LBC have a
peak power consumption of about 56 MVA during
the daytime when the brickworks are in operation
Overnight and at weekends however, their  load
talts to a minimum of about 300 kW As landfill gas
cannot  be stored  economically,  the generating
plant at SMS is operated continuously,  and the
balance of power generated dunng periods ot tow
demand s exported 10 Eastern Electricity at 33 kV

Ptont Performance
The  gas  compressor  has   operated almost
continuously since February 1987 During that time
there has been a failure in me oil supply, requiring a
new electric oil pump, and  three compressor
failures resulting from water getting through the
water separation systems. These laiiures required
compressor replacement or rebuild m each  case
and  action has been taken  to   prevent   any
recurrence.  Three  subsequent  failures   {lor
different reasons) were  also rectified  and me
compressor has operated without maior problems
since the last quarter of 1988.
The generators nave run almost  continuously
apart from mator service shutdowns and minor
faults  Most ot the faults were etectncai and  were
rectified by adiustments 10 equipment There nave

-------
been few problems with me use ol landfill gas as a
fuel,  although  low  methane  content  has
occasionally caused the units to trip  A  typical
methane content in the gas during the early stages
ol monitoring was 50%. This has since increased
to 58% after rectification of air leakages in the gas
collection pipework.
The generation units  have  shown  consistently
high service factors (94-95% for Units 1 and 3 and
93% for Unit 2V The  engine service  at 22.000
hours snowed the engines to be in generally good
condition with only minor problems of wear.

Annual Power Generation and Distribution
Based on operation to date and an annual capacity
factor of about 91.5%. annual power generation is
assessed at 6.612.705 kWh year.
This total comprises
•  exports to LBC:  4.827.275 kWh/year (73%);
•  exports to  Eastern  Elecuiaty;  925.779
    kWh/year (14%);
•  internal consumption:  859.652  kWh/year
    (13%).
Approximately  23%  ol  internal  consumption
(198.381 kWh/yeari  is used in SMS s own offices
on  site and represents a saving to SMS who no
longer have to import from Eastern Electricity

Income from Electricity Sales
Sales  to  LBC  at  a  rate  ol  2.93p/unu  total
C!4l.439/year
Sales to Eastern Elecinoty at a rate of 2 36p/unii
total E21.BdB.yeai
The additional  money available  to  SMS from
savings on imported electricity amounts  to
£6.467/year   giving   a   total   income   ol
£169.754/vear
A further loentitiabie saving derives from the tact
that if SMS did  not have  a power generation
protect  tnev would  sun need to Hare the landfill
gas This would involve a compressor and the
power to onve it wnicn m tms particular location
would cosi  aooul C48 000/year
Allowing let operating ana maintenance costs ol
£59.800'year total net income and savings it the
Siewartby sue  amount to £157954/year
The capital  cost of the protect was £418.470 For
the purposes ot this  analysis, the cost of the
compressor i £36.650) has been exciuoeo from
the  total cost as this would be required anyway to
flare the gas Based on me resulting investment
cost of £381820 the simple payback is 24 years.
CM abstraction plant

Financial Benefits to Replicator*
Assuming that  90%  of  the units  generated
(5.951.435 kWh/year) are exported at an average
tariff ol 2.75p/umt. the annual income would be
£163 664/yeai Additional savings made against
the hire and operation of a portable generator for
the compressor amount to £15.000/year in the
case of a  replication site with a suitable power
supply Operating and maintenance costs remain
at £59.800/year. Net annual income is therefore
£l18.864/year. giving  a  payback period  on a
£381.820 capital cost ol 3.2 years
For a replicator for whom gas control is  not a
prerequisite, no allowance can be made against
the portable generator lor the compressor, ana an
additional figure of £4 500/ year must be added tor
operation  and maintenance. This gives  a  net



Annual OO'.ve-
Generation mWh vean
Exports IkWh vean
internal consumption ikWh/vean
income from power sales
Operating ana maintenance costs
Savings on portable Generator tor
compressor
Net annual income
Capita! cost
Simp* payback
Stewartby



6612.705
5.753.053
859 652
£169754
£(59.800)

£48.000
C157.954
£381 MO
2.4 years
Replication
site without
gas system

6.612705
5.951 435
661.270
£163.664
£(59.800)

£15.000
C1 18.864
C381.B20
3.2 years
Replication
site with
gas system

6.612705
5.951 435
661.270
£163.664
£(64.300)


£99.364
C483.970
4.7 year*
annual income of £99.364/year SMS estimate
that, prior to the start of this protect £45.500 had
already been spent on the gas collection system
and associated wells  it this figure and the cost of
the compressor is charged to me protect then the
capital cost 10 the replicator would be £463.970
giving a payback penoo ot 4.7 years

Combined  Heat  and   Power  Generation
Potential
The engines at Stewartby operate pureiv as power
generation units However, the potential does exist
for heat recovery from the plant  ootn as steam
from waste heat boilers on the exhaust and as not
water from the cooling water circuits
Estimates trom Dor man indicate that at full load
and allowing for losses, about 110 kW could oe
recovered from each engines exhaust  Using an
85% capacity factor the total heat energy available
from  the three engines would amount to  8 850
GJ/year
A further  260 kW would be available  from me
coding circuit equivalent to 20 900 GJ-vear  Tne
recovery ol this  low-grace neai iat annul  70"Ci
would depeno on an appropriate aemana  oemg
available
The cost ot generating the 29.750 GJ m either gas
or gas oil-fired boilers operating at 75°0 efficiency
would be  £2 50/GJ A combined heat and powei
generation system would therefore save a further
ClOO.OOO/yeai  (£30.000/year  it heat  trom me
exhaust systems only was recovered) and  would
reduce the payoack period to 1.5 years (20 years i
These figures make no allowance lor me capital
operating and maintenance costs of waste heat
boilers

-------
 Comments Inxn Shanks 4 McEwan
 Environmental landfill gas abstraction is the duty ot
 every company disposing of wastes. The gas
 which  is collected must be used  usefully or
 deposed of to render it as harmless as possible.
 Shanks & McEwan have been in the  forefront of
 the commeraal use of landfill gas. starling with
 bnck kiln firing m 1981 and electricity generation m
 1964.
 The development of the landfill she at Stewartby
 required the installation of equipment to flare large
 quantities of landfill gas. There was no adequate
 electrical  supply  available  and.  at  first  a
 diesel-powered generator was used  to produce
 the etectncrty When larger quantities of etoctncrty
 were  required,  the  current protect  became
 financially feasible because of savings made by
 substitution of the diesel generator  as well as
 income secured from the sale of etectncrty
 This protect which generates 1.10OW using spark
 ignition  engines,  is the second stage m the
 company's strategy for the conversion of landfill
 gas to electricity It has shown that a number of
 engines can be  operated w parallel and run
 unattended tor 24 hours a day but sbli operate to a
 high level  of  efficiency With  over  100.000
 operating hours achieved we are conftdeiH m
 pressing forward with plans to generate electricity
 at all company landfill sites which have commercial
 quantities of landfill gas available.
                                              Woodekte HOUM
                                              Shanks* McEwen (Southern) Ltd
                                              Shanks  &  McEwan (Southern) Ltd (formerly
                                              London Bnck Landfill) operate a number of landfill
                                              sites in  former quarries of the London  Bnck
                                              Company. These sites cover a total area of some
                                              1.300 ha with a nominal volume of 130 million m1.
                                              The company has been closely involved in the
                                              development of landfill gas extraction smce 1979
                                              and has conducted a number of protects both with
                                              the Department of Energy and the Department of
                                              the Environment.
MrHDTMoss
nchrvcdl Director
Shanks & McEwan (Southern) Ltd.
 The work described here was earned out under me Energy Efficiency Demonstration Scheme.  The Energy Efficiency Office nas replaced the
Demonstration Scheme oy the Best Practice programme which is aimed at advancing mO disseminating impartial information to help improve energy
efficiency Results torn the Demonstration Scheme will continue to te promoted  However, new protects can only be considered for support under the
Best Practice programme
More detailed information on the Shams A McEwan protect a contained ei the final report NP/19.
For cooies of reports and further Mormatton on tttfa or other Industrial piD^elK,pleaMeonlattEfwgyEfflcleneyEnqulrfMBurMu, Energy
lechr-ogy SupfMrt Unit (ETSU), BuHding 156, Hm^
(BRECSU),
tnformirtKvi iw !•>»** "••'-
                                         s, p«eea«coTrtact
                                         t Garaton, Watford WD2 7JR. Tel No: 0923 664258


-------
Energy Efficiency Office
DEPARTMENT  OF  ENERGY
Energy Efficiency Enauines Bureau
Energy Tecnnology Suooort Unit lETSU)
Building 156 Harwell Laboratory. Didcot. Oxon 0X11 ORA
Tel NO: 0235 436747 Telex No: 83135 Fax NO: 0235 432923
 FEBRUARY 1991
Energy Efficiency Demonstration Scheme      Electricity From Landfill Gas
Expanded Project Profile 249      using Gas Turbines
A demonstration of the use of gas turbines to generate power In the waste disposal Industry
Potential users
Medium-large scale landfill waste disposal operations.

Investment cost
C1.946.00011986 crices!

Payback period
11 years.

Savings achieved
57.795 GJ per year valued at £176.780 per year

Host company
BFI Packington Ltd
Packington Hall
Packington Park
Menden
Coventry
CV77HF
Tel No: 0676 22155

Monitoring contractor
Ewbank Preece Ltd
Prudential House
North Street
Brighton
BN11RZ
Tel No: 0273 724533
Mr M Hornsoy
Equipment suppliers
(Gas turbine generator set)
Centrax Ltd
Gas Turbine Division
Shaldon Road
Newton Abbott
Devon
TQ124SQ
Tel No: 0626 52251  Telex No: 42935
MrARStallard
(Compressors)
Belliss and Morcom
ickmeid Square
Birmingham
B161QL
Tel No: 021 454 3531  Telex No: 337507
Mr B Lamb
The aim of the project
Most of Bntam's waste is disposed of in landfill operations. As
the organic waste contained in a landfill site decomposes.
landfill gas. mainly a mixture of methane and carbon dioxide, is
produced. This gas is noxious, inflammable and can be
explosive, and it is recommended that the gas is collected and
burnt. The aim of the protect was to demonstrate the
commercial viability ol burning landfill gas in a gas turbine, which
could be used to generate electricity  The protect also
investigated the requirements to pre-treat the gas prior to
combustion in the gas turbine and the extent of any
environmental impact from such a proiect
      Centrax turbine

-------
 How energy was saved
 Approximately one million tonnes of waste from Birmingham
 and Solihull is disposed of ever/ year in the Little Packington
 landfill site, midway between Birmingham and Coventry. The
 landfill site is 380 acres m area, and by 1987 contained about six
 million tonnes of controlled waste. Landfill gas seepage was a
 nuisance anc as initial boreholes produced gas with a methane
 content of 60%. it was decided to install a 3.65 MW gas turbine
 to generate electricity for direct export to the Midland Electncity
 Board (MEB). The project was supported under the Energy
 Efficiency Demonstration Scheme.
 Landfill gas is supplied to the generation plant compound via
 1.500 metres of buned pipe. The gas is scrubbed and passes
 through a centrifugal blower before being compressed in two
 Bellas and Morcom WH56N compressors. Each compressor is
 rated at 55% duty, although each is capable of delivering 70% of
 the total gas requirement when operated with the blower.
 Before delivery to the turbine, the gas is cooled and superheated
 to control condensation of hydrocarbons. The 3.65 MW
 generator set is a Centrax model CX 350 KB5 powered by a
 General Motors Allison 501 KB5 single-shaft gas turbine which
 runs at 14.250 rpm. The drive to the Brush 6.125 MVA generator
 is taken through a step-down gearbox to 1.500 rpm. The
 generator output is exported to the MEB at 11 kV via a 1.8 km
 long underground cable.
 The turbine first ran on landfill gas on 23rd September 1987.
 Dunng the plant acceptance trials the automatic condensate
 return valves were not functioning. The valves were removed
 and cleaned and. after reinstallation. functioned correctly. During
 commissioning, the No 2 compressor failed and the
 replacement unit also failed. With this compressor out of
 service, most of the operation during the period to January 1988
 was undertaken using No 1 compressor supplemented by the
 gas blower. Under these conditions, it was possible to raise the
 turbine output to about 2.7 MW.
During early running of the compressor, the cylinder head and
valves suffered fouling by chlonde salts and hydrocarbons. In
late December 1987 heavy corrosion was noticed in the
stainless steel flexibles connecting to the compressor. The
fouling and the corrosion were traced to the scrubber liquor
which was being dosed with sodium hypochtonte and sodium
hydroxide. The dosing was thought necessary to remove any
hydrogen sulphide present m the landfill gas. Unfortunately, it is
likely that the sodium hypochtonte also reacted with
hydrocarbons to produce hydrogen chloride. Following advice
from the manufacturers, dosing with sodium hypochlome was
stopped.
In November 1987, to prevent belling which had been reported
on similar plant in the USA. replacement ends of the turbine fuel
manifold were manufactured. Three senous failures occurred on
the gas turbine, all involving the fracture of one of the gas
injection nozzles. All six nozzles were replaced in October 1988
and a further redesign is in hand. Spurious tnps of the turbine
occurred towards the end of 1987 and into earty 1988 which
were mainly caused by the scrubber control panel, which has
since been replaced.
As a consequence of these initial problems the system operated
with an availability of 85% and at a reduced average output of
58%. However, since earty 1988 the system has proved reliable
and has achieved near continuous running. In the period June
1989 - May 1990 the system has been running with an
availability of 95% while operating at 79% of rated output.
All the monitored exhaust emissions have been tower than the
limits allowed for municipal waste incinerators, except in one
instance when the HCI level emitted would have marginally
failed to comply with the EC limit allowed. The noise level
measurements taken at the site have indicated that, at a
distance of 50 m. the noise was inaudible above the total
background noise, even at night.
   Switchgear Room
          1 Transformer
          2 MEB metering panels
          3 Mains circuit breaker
          4 Auxiliary C/BfTran)
          5 Generator OB (Gen)
          6 Generator IIC/B (Future!
          7 MEB tnp circuit power supply
          8 Switchgear (48V) power supply
          9 Batteries (24V)
         10 Battery charger panel (24V)
         11 Turbine control panel
         12 Generator control panel
         13 Gas compressor pane)
         14 Motor control centre
         IS Neutral earthing transformer and contactor
         16 Demountable engme removal beam
         17 Air compressor
         18 Gas receiver
    19 Gas compressor
    20 High pressure natural gas bottles (for starting only)
    21 Gas scrubber
    22 Scrubber dosing tanks
    23 Cooler-gas compressor
    24 Booster
    25 CX350KB5 generator set
    26 Turbine exhaust system
    27 Turbine air mtake system
    28 Oil cooler vent system
    29 Alternator vent system
    30 Turbine enclosure vent system
    31 Generator room vent system
    32 Compressor room vent system
    33 Main cables terminal box
    34 Neutral cable terminal box
    35 Scrubber control panel
    36 Haion bottles                        	
Gas turbine plant layout

-------
 Energy and cost savings
 The total capital cost of the protect at October 1986 pnces was
 £1.946.000. In addition to this amount, expenditure was
 required for the installation of the gas collection system. Since
 this expenditure was necessary to control the gas hazard, the
 cost of these items has not been considered for this particular
 protect. On replica sites, a gas collection system may be
 installed solely for the purpose of collecting gas for the
 generation of electricity Therefore, in the following analysis two
 alternative cases have been considered: one with the additional
 figure of £300.000 has been allowed to cover the cost of
 collection equipment.

 If the proiect had not been undertaken, costs of £55.500
 involved in controlling the landfill gas would still have been
 incurred This is displaced expenditure and may be considered
 as income for the Packmgton site. Considenng these points, the
 table compares the economics of the Packmgton site with a
 replica site without a gas collection system

 The figures in the table are based on the measurements taken
 curing tne monitoring period October 1987 - May 1989 which
 includes the early operation of the plant when availability was
 relatively low. From June 1989 to May 1990 a further 8.760
 hours of operation were completed at improved efficiencies  If
 the plant had achieved target generation with the original
 electricity tanff. this payback would be reduced to 4.5 years
 Centrax has since sold another unit to operate solely on landfill
 gas. This installation enioys a Comprehensive Maintenance
 Contract with guaranteed availability. The cost of the contract is
 significantly less than the O&M figures quoted in this profile
 The use of landfill gas as a fuel to generate electricity is of
 considerable benefit to the nation Not only does it contribute to
 the security and diversity of supply within the Non-Fossil Fuel
 Obligation, but also helps towards environmental control of
 landfill sues
                                                             Gas scrubber
                                                              Paeklngton
                                          Replica site
                                          wttti no gas
                                          collection
                                          system
Income from electricity sales

Displaced expenditure

0 & M costs

Net annual income

Capital costs

Simple payback
  380.280

   55.500

  (259.000)

  176.780

 1.946.000

11.0 years
   380.280



  (259.000)

   121.280

 2.246.000

18.5 years

-------
  BFI Packlngton Ltd
  BFI Packingion Ltd is an American-owned company operating a
  landfill site at Little Packingion. between Birmingham and
  Coventry on part of the estate of the Earl of Aylesford.


  Comments from BFI Packlngton Ltd
  The primary objective of this protect was 10 control the potential
  hazard of landfill gas. Initial investigations were carried out on
  site to determine the extent to which landfill gas was being
  produced. This investigation proved that there would be
  substantial volumes of gas to handle. It was decided at this
  stage that there would be sufficient gas to support the operation
  of a gas turbine. The company's preference lay with a gas
  turbine due to the good combustion that a gas turbine produces
  and hence low exhaust emission levels.
  The initial operation of the generating station proved
  troublesome. These teething problems resulted in relatively low
  plant availability during the early days. Once these problems
  were resolved, the plant managed to give a high level of
  availability The plant is now capable ot giving 97% availability
  and is burning 2.5 million cubic feet of gas per day This high
  availability coupled with benefits under the Non-Fossil Fuel
  Obligation have served to improve the economic results of the
  protect The economics are now more favourable than original
  estimates.
  At the end of the day. this project has proved to be a resounding
  success and we are all very pleased with what has been
  achieved.
                                                                                            Mr T Uncles
                                                                                            Consultant Gas Engineer to
                                                                                            BFI Packlngton Limited
Further Information
The work oescnbeo here was earned out under the Energy
Efficiency Demonstration Scheme More detailed information
on this croiect is contained in the final report ED/296/249 The
Energy Efficiency Office has replaced the Demonstration
Scheme oy tne Best Practice programme wnich is aimed at
advancing and disseminating impartial information to help
improve energy efficiency. Results from the Demonstration
Scheme will continue to be promoted However, new projects
can only be considered for support under tne Best Practice
programme
For copies of reports and further information on this or other
protects, oiease contact tne Energy Efficiency Enquiries Bureaux
aienntr
Energy Technology Support Unit (ETSU)
Building 156
Harwell Laboratory. Oxon 0X11 ORA
Tel No 0235 436747  Telex No 83135
Fax No 0235432923
or the
Building Research Energy Conservation Support Unit (BRECSU)
Building Research Establishment
Garston. Watford WD2 7JR
Tel No 0923 664256  Telex No 923220
Fax: 0923 664097
information on participation in the Best Practice programme ano
on energy efficiency generally is also availaoie from your
Regional Energy Efficiency Office

-------
 Energy Efficiency Office
For furttier information contact
Energy Efficiency Enauines Bureau
Energy Technology SuDDOrt unit (ETSU)
 DEPARTMENT  OF  ENERGY  Building 1S6. Harwell Laboratory. Diacot. Oxon 0X11ORA
                                 cfwcnwt
 JANUARY 1988
 Energy Efficiency Demonstration Scheme
 Expanded Project Profile 217
The use of Landfill Gas as a
Replacement Fuel in a Shell
Boiler
 A demonstration of reduced conventional fuel consumption In the food Industry
 Potential users
 Shell boiler operators within a 10 km radius of a landfill site

 investment cost
 C140.743 (including boiler replacement)
 £50.000 aoproximaiely (burner replacement only)

 Payback period
 3.0-6.6 years (including trailer replacement)
 1 1-2.3 years (burner replacement only)
 (both dependent on the fuel discount rate)

 Savings achieved
 C21.464-C47.170/year (dependent on the fuel discount rate)
 (1986 prices)

 Host company
 Premier Brands UK Ltd
 Pasture Road
 Moreton
 Wirrall
 Merseyside L46 8SE

 The aim of the project
 In this demonstration, landfill gas produced at a landfill site on
 the outskirts of Birkenhead was piped some 2 75 km to a
 Premier Brands factory producing biscuits and other food
 products The gas was used in conjunction with natural gas and
 heavy fuel oil to fire a new shell boiler to provide steam for
 central heating and process use. The aims were to show that
 unrefined landfill gas could be used to fire a shell boiler, to
 determine whether it would increase the nsk of chemical
 corrosion and to assess the environmental acceptability of flue
gas emissions. The consumer benefited financially from the
lower pnce of landfill gas compared with natural gas.

Monitoring contractor
NIFES
NIFES House
Smderiand Road
Broadheath
Altnncham
Cheshire WA145HQ
Tel No: 061 928 5791
Telex No: 669069
Mr G Davies

Equipment manufacturers
BURNERS
Hamworthy Engineering Ltd
Combustion Division
Fleets Comer
Poole
Dorset BH17 TLA
Tel No: 0202 675123
Telex No: 41226
MrAGParrott
BOILER
Wallsend Boilers Ltd
PO Box 38
CalderValeRd
Wakefield
West Yorkshire WF15PF
Tel No: 0924 378211
Telex No 55368
Mr A E Chadwick
 Installation contractor
 Bayliss Kenton installations Ltd
 Harwood Street
 Blackburn
 Lancashire BB130W
 Tel No: 0254 60011
Landfill gas shell boiler
 Landfill g«» firing the boiler

-------
  How landfill oas reduced conventional fuel
  consumption at Premier Brands
  Premier Brands UK Ltd manufactures biscuits and other food
  products at Its factory in Moreton. Merseyside. Steam is raised
  in a central boiler plant for space heating and process use. The
  base steam load is in excess of 1.250.000 therms/year.
  Originally, the central boiler plant consisted of two duel-fuelled
  'Maxecon' single furnace boilers rated at 18,000 and 30,000
  to/hour, a disused 8.000 to/hour Towler water-tube boiler and a
  40.000 Ib/hour water-tube boiler which had recently suffered
  from superheater tube failure. The serviceable boilers are now
  retained as stand-by capacity.
  Bidston Methane Ltd (BM) was formed to exploit the
  commercial potential of landfill gas extracted from a major
  waste disposal site. In 1984. Premier Brands (then Cadbury
  Typhoo Ltd) was approached by BM regarding the possibility of
  using landfill gas from a site some 2.75 km away. A survey of
  companies within an 8 km radius of the waste disposal site had
  identified Premier Brands as a suitable potential customer. A gas
  sale agreement was signed earry in 1985.
  A multi-fired Maxecon unit rated at 30.000 Ib/hour with a
 working pressure of 150 psig was installed on the site of the
 previously scrapped water-tube boiler plant. The new unit was
 capable of f mng on unrefined landfill gas and was fitted with
 fire-tubes and twin burners. Because this was the first scheme in
 the UK to fire unrefined landfill gas in a shell-type boiler, the
 protect was supported by a grant from the Energy Efficiency
 Office's Energy Efficiency Demonstration Scheme (EEDS). As
 pan of this support the National Industrial Fuel Efficiency
 Service (NIFES) was contracted to monitor the contract. The
 landfill gas extraction project also received support under the
 Scheme and this is described in a separate Expanded Project
 Profile (216).
 The new boiler was a conventional thre»pass wetback
 economic unit as normally supplied for natural gas or fuel oil
 firirxj. Each furnace tube was fined with a Hamworthy multi-fuel
 burner designed to bum heavy fuel oi. natural gas or landfill gas.
 In addition, the burners were capable of firing landfill and natural
 gas simultaneously. The Maxecon boiler was considered to be
 particularly well-suited to the project as the reversal chamber
 design enabled the user to operate on one furnace for indefinite
 penods.
 The boiler was arranged so that, during periods of tow steam
 demand, the unit fired landfill gas on one fratube. The second
 burner was either off or was used as a 'top up' using natural gas.
 The two gases were fed into a gas train consisting of an
 upstream manual isolating varve fitted with a rrucroswitch. two
 Clan 1 automatic shut-off varves, j butwrfly control waive and a
dowrwreamffujfHjaJisofcrtingvalvtfrnedtotfwgasinarMfold
Mat flange. High and low gas pressure switches were fitted
wrma third pressure switch fortnevarva proving system.
                                                      Monitoring of the project during the first year of operation
                                                      showed that the shell boiler could be fired successfully with
                                                      landfill gas. One difficulty encountered was with first-time
                                                      ignition of landfill gas which was not always successful. On
                                                      some occasions, it was necessary to intervene manually.
                                                      Subsequent to the monitoring period this has been rectified
                                                      An oxygen-trim system was installed to overcome the problems
                                                      associated with variations in the calorific value of the landfill gas
                                                      and hence the excess air levels. The input of landfill gas was
                                                      established at 33.000 fH/hour as a more consistent calorific
                                                      value could be maintained at this rate. Excess air levels could
                                                      then be set more accurately and any slight deviations could be
                                                      handled by the oxygen-trim system.
                                                      During the first year of operation, plant stoppages were minimal
                                                      and the overall availability of the gas was 98%. Over 60% of the
                                                      consumer's natural gas consumption was replaced by landfill
                                                      gas. The average thermal efficiency of the boiler plant fired with
                                                      landfill gas was 77.1 % compared with 78.4% for natural gas
                                                      firing. The quality of the landfill gas was consistent and no
                                                      noxious emissions were detected in the flue gases. There was
                                                      no evidence of intensified boiler fireside corrosion during the
                                                      monitoring period and fouling was not a problem.
                                                      Boiler replacement, which was one of the major expenditures
                                                      for this project, is unlikely to be considered necessary in the
                                                      majority of future applications of landfill gas. A typical site will
                                                      only require burner replacement. Landfill gas therefore can
                                                      provide an even more cost-effective option, with an associated
                                                      reduced payback penod of less than three years.
                                                                                              Atomising Cup
                                                                »bur
ft*'e*«
                                                Davis Road
                                       School            \
                                                                      260 mm O.D. Polyethylene
                                                                      LandfiN Gas Main
                                                                                                    Bidston Trading
                                                                                                    Estate
                                                                                                     v Bidston Moss
                                                                                                       Landfill Site
                                                                                             Plant ftSwitchroom

                                                                                             River Birket Crosimq
Route of the tandHII ga» mafti

-------
Conventional fuel and cost savings
During the 12-month monitoring period. 1.048.282 therms were
supplied by landfill gas. 460.120 by natural gas and 205.312 by
fuel oil. Theprice of natural gas fell during the period which in
turn affected the pnce of the landfill gas. Fuel costs for the year
were: natural gas £121.615; fuel oil £45.867. The accompanying
table shows the cost of landfill gas tor 10%. 15% and 20%
discount rates (per therm).
To determine the financial savings made as a result of changing
to landfill gas. it is necessary to take acount of the difference in
the thermal efficiency of the boiler for natural and landfill gas and
to calculate how much natural gas would have been required to
give the same thermal output achieved with landfill gas firing.
The landfill gas consumption of 1.048,282 therms was adjusted
to give an equivalent natural gas input of 1.030.900 therms
(4.124 tee) costing £252.811. Annual fuel cost savings for 10%.
15% and 20% discounts of landfill gas over the equivalent
natural gas requirement are £21.464. £34.317 and £47,170
giving simple payback periods of 6.6.4.1 and 3.0 years for the
capital cost investment of £140.743.
A potential landfill gas user with a suitable existing boiler would
only need to install a triple fuel burner and ancillary equipment
which would probably cost about £50.000. Assuming the same
levels of saving apply this results in payback periods of 2.3.1.5
and 1.1 years respectively.
Replication
In the UK. approximately 25 M tonnes of biodegradable waste
is deposited each year throughout 669 landfill sites. Of these
approximately 300-350 contain sufficient quantities of refuse to
produce commercial quantities of landfill gas. In the main.
potential customers will be those large energy consumers
within a reasonable distance of a suitable landfill site (say 10 km)
and who have a continuous non-fluctuating base energy load in
excess of or dose to the anticipated site yield. However, this
does not preclude the smaller, non-continuous energy user
being able to make full use of landfill gas facilities. A landfill site
is not restricted to a single user and there is no fundamental
reason why it could not be used by a consortium. The application
of landfill gas would be ideal for the chemicals, paper, textiles
and food industries.
Multi-boiler plants and/or multi-burner boilers of the water-tube
or fire-tube type would be most suited to burning landfill gas in
commercial quantities. Most replicators would only require new
burners for existing boilers and this would improve the
economics of such schemes and reduce considerably the
simple payback penod.
                              Cost savings from using landfill gas

                                                              Landfill gas discount
                                                           10%      15%      20%

                              Landfill gas                £231.347 £218.494 £205.641
                              Natural gas used instead     £252.811 £252.811 £252.811
                              of landfill gas*
                              Savings                    £ 21.464 £ 34.317 £ 47.170
                              Payback penod             6.6 years 4.1 years 3.0 years
                              (including boiler replacement)
                              Payback penod             2.3 years 1.5 years 1.1 years
                              (burner replacement only)
                              •corrected for boiler efficiency when firing landfill gas

6_
•s
S t.
§. 5-
1 4
g 4-
u
5 3-
to
a
a>
f5
2-


















.

X
X
Costs ai >
beginning of 1986











•*•»*,
Costsat*'
beginning of




X
X
N.

— • ^
*- 	
1986^



Co
«
«
Co
-— -.
—• —



sts for
•^
^-
stsfor
•* ~.
•*• —



986

.^
1986
— —
1=9






•• -
m^mm.




~~
"— •
• .
••w




» ^
•--
^
1 New boiler
J installations
_ Original boiler
J with new
burners)
0 10 15 20
Landfill gas discount on mterruptibte natural gas costs (%)
Simple payback periods for landfill gaa installations

-------
  Premier Brands UK Ltd
  Premier Brands is a maior UK manufacturer of biscuits and food
  products. It is therefore a large consumer of energy. The
  Merseyside factory at Moreton raises steam in a central boiler
  plant to provide space and process heating. The factory base
  steam load is in excess of 1.25 million therms/year.

  Premier Brands' experience
  During the early 1980s, site management faced a number of
  difficult decisions regarding steam generation. The demand for
  process steam had dropped dramatically as both confectionary
  manufacture and corrugated paper making had ceased on site.
  At the same time the generator and boilers were neanng the
  end of their useful lives. During this period the site operated on
  mterruptible gas with heavy fuel oil as stand-by. The first
  attempt to reduce fuel costs involved the installation of a waste
  fired boiler to be fuelled by combustible waste generated on
  site. The proiect was unsuccessful and expensive. As a result.
  the Company was hesitant when approached by National
  Smokeless Fuels (NSF) with an outline proposal for the use of
  landfill gas from the nearby Bidston landfill site  However, it did
  offer the opportunity to complete the renewal of the boilers.
  Price relativities between landfill gas. interruptible gas and heavy
  fuel oil were carefully monitored as the oil once varied. As a
  result, it can be seen that the reduction in fuel costs assumed
  for this protect have, in fact materialised. Landfill gas provides a
  considerable proportion of our total fuel requirement The
  technical risks thought to be associated with combustion and
  corrosion were imagined, rather than real. Unfortunately the
  installation does not allow for every permutation of landfill gas.
  interruptible gas and heavy fuel oil and there continues to be
  some difficulties experienced balancing landfill gas volume
 against calorific value.
 Close cooperation with all panics concerned and the setting of
 tight deadlines for implementation have assisted with the
 prefect's overall success. The protect has proved the
 acceptibility of landfill gas as a replacement fuel in shell boilers
 and achieved the cost reductions sought by the Company
 Commitment to the protect is enthusiastic and it has been the
 Company s most effective innovation in utilities.
                                             Bob Mottram
                                             (Site Director)
Further information
Tne worn aescrioea nere was carries out under the Energy
Efficiency Demonstration Scheme
Tne Energy Efficiency Office has replaced the Demonstration
Scneme by tne Best Practice programme which is aimed at
advancing and disseminating impartial information to help
improve energy efficiency. Results from the Demonstration
Scheme will continue to be promoted However, new protects
can only be considered lor support under the Best Practice
programme
More detailed information on this protect is contained in tne final
reoortED'19V217
For copies ot reports and further information on this or otner
protects please contact the
Energy Efficiency Enquiries Bureau
Energy Technology Support Unit (ETSU)
Building 156
Harwell Laboratory
Oxon OX11 ORA
Tel No  0235436747
Telex No 83135
Fax No 0235432923
Information on participation m the Best Practice programme ana
on energy efficiency generally is also available from your
Regional Energy Efficiency Office

-------
Energy Efficiency Office
         ^^		^	   Energy Technology SuDDort unit (ETSU>
   DCOADTKMFNT   Of  F N E P G Y   Building 156. Harwell LaDoratory. Didcot. Oxon 0X110RA
   EP ART MB I* 1   Or  c               Te| No ^235 456747 Te(ex N0:83135 Fax No 0255 4J2925
DECEMBER 1986
Energy Efficiency Demonstration scheme
Expanded Project Profile 153
Landfill Gas used
as a Fuel In a
water Tube Boiler
A demonstration of conventional fuel savings In the paper board Industry.
Potential users
Operators of water-tube boilers within 1 0km of appropriate
landfill sites
 Investm
 C267.000
 Payback period
 Between 1 and 2 years
 Savings achieved
 C160.75Q/vr assuming a natural gas cost of 2Bp/therm and a
 landfill gas supply discount rate of 15%
 Host company
 Purlieet Board Mills
 London Road
 Purfleet
 Essex RM161RD
The aim of the project
Every year about 25 million tonnes of waste are buned in
landfill sites in the UK. Organic material in the waste disposed
of in this way decomposes under anaerobic* conditions and
often produces a methane-nch gas. This gas can give nse to
local environmental problems at some sites where the gas
must be collected and flared. In some cases, the amount of
gas produced is sufficient to be attractive commercially as an
alternative fuel to nearby industry.
In this demonstration, landfill gas produced at a large landfill
site at Aveley in Essex was piped to Purfleet Board Mills and
used as the base fuel on a steam-raising boiler. The aim was to
show that the gas could be used successfully in conjunction
with either natural gas or heavy fuel oil and that it would be a
safe and reliable source of energy The consumer benefited
from the lower pnce of landfill gas compared with natural gas.
It was anticipated that landfill gas would contribute about
5.000.000 therms (20.000 tee) to the 14.000.000 therms
(56.000 tee) consumed by the plant annually.
•in the absence of oxygen.

MonltorlnQ conti jctur
NIFES Consulting Engineers
Chamngtons House North
The Causeway. Bishops Stortford
Herts CM232ER
Tel No: 0279 58412
Mr A E Wright

Equipment manufacturer/Installer
COMPUTER. CONTROLS AND COMMISSIONING
Babcock Bristol Ltd
218PuneyWav
Crovdon
Surrey
Tel No: 01-686 0400
MrJTBoswell

BURNERS AND BURNER MANAGEMENT
Babcock Power Ltd
Combustion Equipment Department
165 Great Dover Street
London SE14YB
Tel No: 01-407 8383
Mr D L McLachtan
I 3 see Potential users

-------
 How landfill gas reduced conventional
 fuel consumption at Purfleet Board Mills
 The waste disposal site at Aveley in Essex covers 66 acres
 and receives large quantities of domestic refuse each year.
 In 1979 the Greater London Council (GLC). who owned the
 site, called in National Smokeless Fuels Ltd (NSR to
 investigate the release of gas and to make recommendations
 for its treatment. It was determined that decaying refuse
 was generating a methane-rich gas in commercial
 quantities which could be useful as a fuel to local industry.
 One of the large fuel users in the area. Purfleet Board Mills.
 agreed to buy landfill gas from Aveley and to use it to augment
 the conventional fuels used on a Babcock water tube boiler at
 its paper board mill  The boiler, which was rated at 200.000
 Ib/hour and fired by four natura^gas burners (with heavy fuel oil
 as standby),  raised steam for electricity generation Purfleet
 Board Mills decided to change to landfill gas burning on one of
 the burners.  This involved installing a new 500m-long gas main
 from the Purileet Board Mills boundary to the boiler plant.
 replacing one of the old burners by a new burner designed
 especially to bum landfill gas. and installing a computer control
 system to optimise combustion conditions and control general
 plant performance All these changes were maoe as part of
 the Energy Efficiency Office's Energy Efficiency
 Demonstration Scheme The laying of an underground pipeline
 from Aveley to Purfleet - a distance of some 2Vz miles - was
 undertaken jointly by the GLC and NSF.
 Special consideration had to be given to the nature of landfill
 gas in making the modifications. For example, the gas has a
 higher moisture content and is a mixture of methane and
 other, mainly inert, gases. It also has a lower calorific value
 than natural gas and this value tends to vary with the rate of
 use and the prevailing weather conditions at the landfill site.
 The cross-sectional area of the gas main was made twice as
 large to allow an increased rate of flow and so compensate
 for the lower calorific value of the gas: the discharge area of
 the holes in the burner were increased for the same reason.
 At the Aveley site, the gas was chilled pnor to transport to
 remove the mapnty of the water while, at the consumer
 end of the pipeline, water traps and fine mesh filters were
 incorporated to reduce still further the water content and
 any entrained debns. The landfill gas was used as the base
 fuel on the boiler so that the other conventionally fuelled
 burners could compensate for any variations in supply. An
 automatic computer control system regulated fuel and air
 supplies to the three original burners according to steam
demand
 The plant has now been operating in its new mode since
April 1983 and the performance has been sufficiently
encouraging for Purfleet Board Mitts to modify another
                                    burner entirely at their own expense. Detailed monitoring
                                    was earned out as pan of the demonstration from May 1983
                                    to Apnl 1984. This recorded the consumption of all fuels
                                    used, the thermal efficiency of the boiler and the calonf ic
                                    value of the landfill gas. In addition, tests were made to
                                    check whether corrosion within the boiler was increased by
                                    using trie new fuel.
                                    Results indicate that landfill gas has reduced the use of
                                    conventional fuels by slightly less than was expected.
                                    mainly because of a limited production rate at the well.
                                    Improvements have now been made which should increase
                                    the amount of gas available from the site and more than
                                    match the original requirements. Filters have had  to be
                                    cleaned about every two months to remove a deposit of
                                    sludge and occasionally the gas supply has been shut down
                                    by the supplier for about an hour to allow maintenance to be
                                    earned out. This process usually results in a higher calorific
                                    value on return of supply. Regular checks on the calorific
                                    value of the gas have revealed that it tends to be above
                                    average after a holiday shut-down and below average
                                    dunng periods without any appreciable rainfall.
                                    Burning landfill gas has presented few problems at the
                                    burner or in the boiler. By making it the base fuel, variations
                                    in supply and the occasional shut-down have been
                                    accommodated without any trouble. Initially,  there was a
                                    problem of flame instability with the new burner which was
                                    caused by the gas discharge velocity being too high:
                                    because of the high men content (CO}), landfill gas has a
                                    much lower flame speed than natural gas. The holes in the
                                    burner were opened up further to give a lower velocity and
                                    no more problems have been expenenced. The general
                                    appearance, shape and colour of the landfill gas flame is
                                    virtually identical to that produced by a natural gas burner
                                    Tests have shown that there has been no increase in the
                                    incidence of corrosion in the boiler with landfill gas burning
         Landfill
         Gas
         PT eline
      Filters
   Water Traps
           J.
                                                  Forced
                                               Draught Fan
                                                      High Pressure
                                                      Steam
   J
   From Aveley
   (2'/j mnes)
-*-D-e
                  Purfleet Board Mills
                                                 C___—-j
                                                 rorceo
                                               Draught Fan

-------
Conventional fuel and cost savings
Details of the consumption of fuels in the water tube boiler
before and after modification are given in the accompanying
table. Data for 1982 are taken from records kept by Purftoet
Board Mills and refer to the period 1 January-31 December.
while the 1983-84 figures come from the demonstration
monitoring exercise between May and April. As can be
seen, the average measured efficiency of the boiler
dropped between these two periods. If the boiler had
operated at its original efficiency throughout and the thermal
output for 1983-84 had remained unchanged, the total
thermal input for the period would have been 14.137.974
therms. Subtracting the contributions of natural gas and oil
from this figure gives the consumption of landfill gas as
3.827.184 therms (15.310 tee) corrected for the difference in
boiler efficiency.
The installation at Purfleet Board Mills cost a total of £267.000.
Financial savings in this demonstration resulted from the
lower price paid for landfill gas compared with natural gas.
Assuming that natural gas costs 28p/therm and that landfill
gas is supplied at a 15% discount, financial savings of nearly
£160.750 are made each year in an installation like this
giving a simple payback period of just over one and a half
years. The graph shows how the payback penod is affected
by different discount rates.

THERMAL INPUT:
Natural gas. therms
Fuel oil. therms
Landfill gas. therms
Total, therms
BOILER EFFICIENCY
THERMAL OUTPUT.
therms
.Before
modification
1982
12.943.703
691,346
13.635.049
79.5%
10.844.185
After
modification
1983-84
10.217.227
93.563
4.099.251 •
3.827.184"
14.41 0.041 •
14.137.974"
78%
11 244170
                 •Recorded data
                ••Calculated at 79.5% efficiency
          30-
          25-
          15-
          10-
           5-
10.99 years
                                                 1.25 years
                    1.66 years
                                                                                12.49 years
                                                   Simple Payback Period. Years

-------
 Purfleet Board Mills' experience
E Charles Smith
Chief Engineer
 "In 1980/81, Purfleet Board Mills had been conducting a senes
 of investigations into alternative energy sources: during these
 we learned from NSF -with whom we had previous
 assoaaton-of the possibility of a supply of LF Gas suitable
 for use as a fuel from a landfill site near the Purfleet Mill.
 Energy was becoming a major proportion of production
 costs, and had doubled in recent years. This possibility of
 using LF Gas as a boiler fuel was examined in some detail
 and its feasibility was confirmed.
 There was in service at Purfleet a water-tube boiler with
 spare capacity which could be converted, and in 1982
 authority was given to proceed with the project.
 It was anticipated that flame stability could be a problem.
 and a low pressure burner was obtained to fit in place of one
 of the four existing burners so that the boiler could be dual
 fuel fired. Rue gas analysis and computer control was
 installed to provide precise regulation and maintain
 eff iaency. although some loss of eff iciency was anticipated
 due to the higher non-combustible content of LF Gas.
 Problems with the installation were few, and first f inng of
 LF Gas took place in Apnl '83, one year after the proiect
 started.
 LF Gas provides some 30% of total fuel requirements, the
 improved boiler control has compensated for losses due to
 LF Gas and there has been no appreciable loss of operating
 efficiency.
 It was anticipated that some boiler gas-side corrosion
 could occur due to LF Gas. but  monitoring tests have shown
 no measurable effect dunng the first year of operation
There were initially a number of boiler shutdowns due to
combustion disturbances; these were of short
duration and had been anticipated and allowed for in the
protect assessment. The protect is providing the anticipated
 return with 4M therms being supplied in the first year of
operation.
The target of 5M therms was not achieved, but
arrangements have been made to extend the use of LF Gas
by converting a second burner.
The proiect has been successful It would have been more
convenient if this had been developed as part of a complete
new installation, or used in a separate base load boiler, since
the present installation seriously restricts any controlled
trials to determine optimum conditions. There is every
indication that this project will be developed and continue to
make a major contribution to energy cost reduction!'
Furttier Information
The work described nere was carried out under the Energy
Efficiency Demonstration Scheme.
The Energy Efficiency Office has replaced the Demonstration
Scheme by the Best Practice programme which is aimed at
advancing and disseminating impartial information to help
improve energy efficiency. Results from the Demonstration
Scheme will continue to be promoted. However, new protects
can only be considered tor support under the Best Practice
programme
More detailed information on this protect is contained in the final
report ED/060/153
For copies of reports and further information on this or other
 protects, please contact the
 Energy Efficiency Enquiries Bureau
 Energy Technology Support Unit (ETSU)
 Building  156
 Harwell Laboratory
 Oxon 0X11 ORA
 Tel No: 0235 436747
 Telex No: 83135
 Fax No: 0235 432923
 Information on participation in the Best Practice programme and
 on energy efficiency generally is also available from your
 Regional Energy Efficiency Office

-------
                                 APPENDIX L
                  The Econonlcs of Landfill Gas Projects
                           in the United States1

       By G.R.  Jansen, Vice President, Laidlav Gas  Recovery Systems


 This paper is  based on the experience of Laidlav Gas  Recovery Systems in
 developing,  owning and operating landfill gas projects since the early
 1980's.

 Although GRS is currently operating 12 landfill gas projects,  only one
 of these, is a medium BTU project.   This project is located in
 Sacramento,  California and sends over 1 M4 cubic ft./day to a  Biomass
 plant burning  almond shells.  The rest of the GRS projects are landfill
 gas to electrical energy projects ranging in  size from 650 Jew  to 20,000
 kw.  The projects are located mostly in Northern and Southern
 California.

 The information in this paper including the capital costs,  pricing of
 electrical energy, and operating costs comes  from the  GRS electrical
 projects. Although the overall economic analysis contained in this
 paper is for a small electrical generating project, much of the same
 type of  analysis and evaluation of  the same factors would have to be
 carried  out  for a medium or a high  BTU landfill gas project.

 Medium BTU

 The GRS  Sacramento plant is a medium BTU project which began operation
 in  1991  at a level of a little over 1.0 million cubic  feet of  landfill
 gas per  day.   The landfill at Sacramento has  continued to be filled
 during the operation of the GRS facility which will eventually allow
 more landfill  gas to be generated.   The capacity of the plant  is
 estimated to be between 1 and 2 million cubic feet per day with some
 minor modification.

 The gas  is collected,  filtered, compressed to about 6  psi and  then piped
 to  the Generating Plant where it is used as a fuel in  a steam  power
 plant supplementing natural gas.

 Electrical

GRS began generating electrical energy in Northern California  in 1983
with the 1 MW plant.   By 1991 (figure l).  approximately 44.5 MW were  on
 line selling power to  the various utilities.   The plant locations,
capacities and  amount  of gas processed per day are:
  1This  paper was  presented in Melbourne,  Australia,  on  February 27,  1992
                                 L-l

-------
 Location                        Capacity          Gas Processed
                                   MW           MM cub. Ft. per day

 Menlo Park, CA                    2.0                  1.5
 Guadalupe, CA                     2.5                  1.9
 Nevby Island, CA                  5.0                  3.8
 American Canyon, CA               1.5                  1.0
 Mountain View, CA                 3.5                  2.5
 Coyote Canyon, Orange Co., CA   20.0                 14.0
 Sycamore, San Diego, CA           1.5                  1.0
 San Marcos, San Diego, CA         1.5                  1.0
 Orange, New York                  3.0                  2.0
 Kapaa, Hawaii                     3.0                  2.0
 Santa Cruz, CA                    i.o                	J_
                      Total      44.5                31.4

 GRS generates electricity front  landfill  gas using many different  types
 of generating equipment ranging from small multi  unit  reciprocating
 engines, to gas turbines, and ultimately a steam  turbine.   (Figure 2)
 In general, the technology was  tailored  to each particular application.

 The first group of projects tended to use small 500 kv naturally
 aspirated internal combustion engines.   Since there were  no similar
 projects on the west coast when we began operating in  early 1982,
 engines were selected based on  their simplicity and operating histories
 in the closest similar environment.   These were the Cooper Superior
 straight 8's which had an excellent operating history  in remote oil
 pumping stations,  drilling platforms, and many  applications using  fuels
 with heat rates less than natural  gas.   The operating  philosophy was
 than many small units would be much more reliable in terms of
 maintaining productivity, than one or two larger ones.  Also, our  first
 landfill  gas project at Menlo Park had been tested by  one  of our
 competitors and found to not  contain enough gas for economic production.
 Cur concept was that if the gas  supply decreased over  time we could
 reduce the number  of units to correspond to the gas supply.

 Finally, as our experience in estimating the volume of landfill gas
 improved, we began to take greater risks in the number and type of prime
 movers.  The air quality and  other environmental considerations also
 began  to play a larger and larger  part in the selection of equipment.
 Our largest project,  the 20 MW steam turbine in Orange County,
 California was built in the most restrictive air quality basin in  the
 U.S., and subject  to all of the  rules and regulations  of the South Coast
Air Quality Management District.
                                                ^
The project was originally planned as 5  Solar Centaur  gas  turbines
 generating approximately 15 MW.  Air quality permitting quickly rejected
 this technology as  being too high  in NOx emissions.  The resulting
boiler and steam turbine was several magnitudes cleaner with NOx
emissions in the 15 to 20 parts  per million.
                                  1-2

-------
               Figure 1
MW
          GRS POWER OUTPUT
                   MW
                                  1991
              L-3

-------
                                FIGURE 2


                                   GRS

                           TECHNOLOGIES
NUMBER


 11


  2


  4


  2


  1

  5

  2
             TYPE
 8 CYLINDER NATURALLY ASPIRATED
 COCPER SUPERIOR RECIPROCATING ENGINES

 8 CYLINDER TURBOCHARGED COOPER SUPERIOR
 LEAN BURN RECIPROCATING ENGINES

 12 CYLINDER TURBOCHARGED WAUKESHA. LEAN
 BURN ENGINES
   OUTPUT


 500 KW EACH


 750 KW EACH


1100 KW EACH
16 CYLINDER TURBOCHARGED COOPER SUPERIOR  1750 KW EACH
LEAN BURN ENGINES
        ELECTRIC STEAM TURBINE

SCLAR SATURN GAS TURBINES

SCLAR CENTAUR GAS TURBINES
    20 MW

1000 KW EACH

3000 KW EACH
                                   L-4

-------
 Factors which we consider in developing a project

  . Landfill Characteristics
  •Markets
  - Technology
  • Environmental
 1.  Landfill Characteristics

 Figure 3 lists the factors  that should be considered in deciding whether
 or not a landfill is  worth  developing.  A landfill gas study is always
 useful especially during later financing  by banks and other
 institutions.  The issue of whether  there is gas in the landfill and the
 credibility of the engineer making the estimate becomes a very major
 factor in determining now or  if the  project is financed.  We have had
 limited success in predicting gas and have  tended to become more and
 more conservative.

 A beginning and relatively  safe rule of thumb is to use the gas
 generating factor of  0.1 cubic feet  of gas  per year from each pound  of
 refuse placed in the  landfill.  This only applies to landfills that
 contain household refuse and  are somewhat wet.   Moisture content of  the
 refuse does play seme part  in the volume  of gas generated, although  it
 is unclear at this point just how important this is in the long run.

 2.   Markets

 This factor probably more than any other  determines if the project will
 go forward,   if there  are no  customers for  the medium or high BTU fuel.
 or the electricity produced by the project,  nothing will happen.
 Further, not only  trust there  by buyers for  the product, but they must be
 prepared to take as much as the landfill  can produce.  Purchase
 contracts must  be  "take  or pay" contracts.

 The contract negotiation for  the landfill gas or electricity produced
 should be carried  out  immediately following the gas test of the
 landfill.  At this  point, electrical generating capacity in KW, or
 volume of cubic feet per day can be estimated.   Curtailment provisions.
base energy rates,  and escalators should  be worked out since these will
be required by the  financiers.  Signed contracts are essential.  Verbal
agreements are great, but signed contracts  are bankable.  Use of a good
energy contract attorney  is highly reconmended.  There is nothing worse
than trying to renegotiate terms and conditions the second and third
times.  This creates time delays and more importantly, developer
credibility suffers.
                                L-5

-------
                   FIGURE 3

          LANDFILL CHARACTERISTICS
MINIMUM GAS REQUIREMENTS FOR RECOVERY PROJECT

 - In place tonnage:  2 million plus
 - Depth of Refuse:  35 feet or more
 * Type of Refuse
 - Acreage:  35 plus acres
 - Continued landfill operation for several years.
 - Seal/cap material on landfill
 - If the landfill  is closed, how long did it operate
   and when was it closed.
                     L-6

-------
 Electrical projects in California and a number of other states have been
 made much easier by the adoption of so called "Standard Offers" which
 require utilities to purchase  power from small cogenerators.  Not only
 are the terms and conditions set by the Public Utility Commission,
 (PUC),  but in sane cases the prices of electrical energy as well.  The
 contracts are usually "take or pay" and are relatively easy to
 understand by the developer and the financier.

 To foster the growth of cogenerators,  in the mid 80's utilities offered
 so called firm price offers or contracts.  This fixed the price the
 developer will be paid for this energy for a relatively long period of
 time (10 years) and took away  one of the major uncertainties in
 financing landfill gas projects.   In some contracts the developer has
 the option of selecting either a fixed price per kwhr or a floating
 price per kwhr contract, or a  combination of both.   In California,  this
 type of contract was called Standard Offer No. 4.  The original S.O.
 §4's created a gold rush of "blue suede shoe" developers.  By the time
 the PUC's/utilities realized their mistake, over 10.000 MW were signed
 up.

 Figure  4 shows the historic growth in  both natural  gas rates and
 electrical rates since the 1970's.   Although the figure shows the retail
 price of energy it does serve  to illustrate that in the case of
 electrical energy, the price is projected to remain relatively level.
 All of  the statistics are fron PG&E which is one of the largest
 utilities in the U.S.

 The price of energy paid to the landfill gas developer is not however,
 the retail price of energy.  The cogenerator price, the so called
 "avoided cost" is shown in figure 5.   Simply, the avoided cost is the
 cost the utility "avoids" by buying power from a cogenerator rather than
 building its own facilities.   It is defined as the  product of the
 utility's incremental heat rate and the marginal cost of the utility's
 fuel.

 This marginal fuel in the case of PG&E is either natural gas or oil or a
 combination  of both.  Figure 5 also shows the fluctuations in the
 avoided cost that have taken place  since 1980.  Not only does the
 falling price of natural gas or world  oil pricing effect the avoided
 cost but  also the utility's own heat rate.  When PG&E started up their
 nuclear powered generator (Diablo 1).  in 1985, there was a significant
 drop in the  avoided cost primarily  due to the decrease in the heat  rate.
 In effect, PG&E was able to shut  down  sore of the more inefficient  power
plants in their system.
                                  L-7

-------
             Figure 4
          Gas Rates (Real)
8
6
  Dollars per DTh
 PG&E    CEC
  1970 1975 1980 1985 1990 1995 2000 2005
       Electric Rates (Real)
  Cents per kWh
PG&E    CEC
 1970 1975 1980 1985 1990 1995 2000 2005
       L-8

-------
                         Figure 5
c/kwhr
              UTILITY AVOIDED COSTS
                           CKWHR
                  i:i!'ls I  n
            I'M SAO i i I '   '-all/I'
         1980  -  1982  •  1984  i  1986  i  1988  :  1990  I  1992
            1981    1983     1985..   1987    1989    1991
                          L-9

-------
 In addition to paying a price for the generated Jcwhrs.  seme utilities
 alsr pay a capacity payment.  Very singly,  this is a payment (based on a
 generating turbine), paid to a cogenerator  for having a reliable power
 plant capable of delivering power at least  80% of  the time  during the
 utilities' peak months.  The capacity payment  can  be levelized depending
 on the term of the contract and depending on how long the developer
 thinks landfill gas in his project will last.   Rates varied but were
 generally between S100 to S200/kvyr.

 In seme States, the capacity payment is simply added into the  price of
 electrical energy and is paid on a cent per kwhr basis.  In  California,
 the capacity impact is approximately 1.5 to 1.8 cents per kvhr.

 By the late 1980's even this vent away as utilities decided  they had too
 much capacity.  Figure 6 is a comparison in between the fixed price of
 Standard offer No. 4 and Standard Offer No. 2  in which there is no fixed
 pricing but is based rather on the actual avoided costs that the utility
 experiences.  In 1985, in PG&E's area, the actual avoided cost of
 Standard Offer No. 2 was consistently higher than Standard Offer No. 4.
 By the time the world oil glut was felt in the marginal fuel pricing in
 early 1986 this had reversed.  As shown in figure 6,  the current
 estimates are that the actual avoided costs of Standard Offer No. 2 will
 be below the higher rates of Standard Offer No. 4 for the foreseeable
 future.

 3.  Technology

       Type of gas collection system

 There are many types of gas collection systems.  The  most conventional
 is a system with vertical wells and horizontal collection headers spread
 out over the surface of the landfill.   The most effective and least
 costly to repair are those in which the headers are on the top of the
 landfill  and are exposed.   Many owners of landfills require  that the
 header system is placed underground.   The cost of the gas collection
 system significantly increases in this case since settlement in the
 landfill  causes collection system breakage which in turn results in
 expensive excavation to gain access to laterals.  In  some cases it's
 cheaper to just replace parts of the system altogether.

 Trench collection systems  have been shown to be effective in certain
 instances as have pipe systems installed in refuse while it  is placed in
 the landfill.   In many cases where we have tried horizontal  systems.
breakages of the lines occurred and  the lines were ultimately abandoned.
The quality and quantity of  the gas generated using these systems was
also less than was observed with  vertical  systems.
                                   L-10

-------
                       Figure  6
     AVERAGE PURCHASE PRICE FROM QFs
(V
a
C
0/
U
                     Standard offer
                                  Standard offer *2
    May-79    Nov-84    May-90    Oct-95   Apr-2001

-------
 If the landfill is open, additional problems have to be resolved  in
 designing gas collection systems that are compatible with the on  going
 refuse filling operation.  How expensive this is ultimately is a
 function of the attitude of the landfill operator.  Lateral collectors
 often cross roads which requires culverts and other types of
 reinforcing.

 On the basis of GRS's experience, the cost of the gas collecting system
 is not the major expense in developing a landfill gas project.  In
 general, we have found that the cost of the collection system varies
 between 10% and 20% of the total capital cost of the project.

 The materials used for gas collection systems and their location on the
 landfill are shown in Figures 7 ft 8.  These statistics were developed
 from a survey of most of the landfill gas projects in the whole U.S.
 (Ref. 1)  Most of our installations, similar to the national statistics
 use pvc. and polyethylene in the gas collection systems.   Over the last
 several projects however, we have begun using High Density Polyethylene
 which is stronger and less brittle than the other materials.   Similar to
 the national statistics, most of our collection systems are underground.

       Gas Processing

 The type of gas processing equipment is dependent on the product end
 use.   Variables such as hourly gas volume,  pressure,  filtration,
 condensate removal equipment have to be determined for each landfill.
 Volume of gas is simply the amount of gas that the collection system
 removes from the landfill.   All of the other variables are determined by
 the requirements of the end user of the medium or high BTU fuel or the
 engines used in generating electricity.   Specific examples of the  cost
 of gas processing as the volumes and pressures increase are included
 later in this paper.

       Electrical generating equipment

 The technology of electrical generating equipment is to a  great extent
 determined by the volume of gas available and the air  pollution
 requirements  of the area in which the project is located.   Internal
 combustion engines begin at approximately 500 KW and go up to well over
 3000 KW.  A rule of thumb is that 1 million cubic feet of  landfill gas
per day at 450 BTU per cubic ft.  will generate from between 1250 to 1600
KW per hour.

 "Clean burn" or  "lean bum" technology is generally required by air
quality districts  as  being  the most efficient in terns  of  reducing NOx
and CO pollution.   The down side  is that these engines  also require over
90 psi in fuel pressure and increased maintenance to operate them.
                                   L-12

-------
                                Figure 7
                 MMERIALS T1SF7) IN LATERAL/HEADER FIFES4
                                            Status
Tvne of Material
Polyethylene (PE)
Polyvinyl Chloride (PVC)
High Density
Polyethylene (HDFE)
PE and PVC
Other Material
Total %
(Total f)
pi aj^nffi
38.9%**
22.2
33.3
0.0
9.6
100.0
(18)
Existing
48.0%
31.0
6.0
13.0
2.0
100.0
(100)
All Facilities
46.6%
(55)
29.7
(35)
10.2
(12)
11.0
(13)
2.5
(3)
100.0
(118)
*Survey based on average of 170 projects.
 No information was available from 39 projects with respect to lateral/
 header piping materials.
**Percentage of column.
                                L-13

-------
                                Figure 8
                             OF LATERAL/HEADER PIPES*
Tvoe of M3terial
Above Ground
Below Ground
Above and Below
Ground
Total %
Planned
11.8%**
82.4
5.9
100.0
(17)
Existing
23.5%
66.7
9.8
100.0
(102)
All Facilities
21.9%
(26)
68.9
(82)
9.2
(11)
100.0
(119)
'Survey based on a sunroary of 170 projects.
 No information was available from 38 projects with respect  to location
 of lateral/header pipes.
"Percentage of column
                                    L-14

-------
 Gas turbines tend to be smaller than the corparable sized Internal
 combustion reciprocating engines and have better emission
 characteristics.  A negative is that the gas inlet pressure requirement
 can be well in excess of 100 psi.  Consequently, turbine installation
 have high parasitic loads.   Historic operating statistics indicate that
 while the turbines are trouble free, the gas processing and filtering
 equipment is the high maintenance item.

       Interconnect

 The electrical interconnection between the utility and the project can
 be quite expensive especially if the utility has to make modifications
 to its substation.  As much of the interconnect should be built by the
 landfill gas developer as possible.   This saves tine and is generally
 much less expensive than if the utility does it.  Lead times for
 California utilities tend to be well over 6 months from beginning
 planning to final construction.   This should be included in the
 development schedule.

 4.  Environmental concerns

 The environmental concerns  for project development of a landfill gas
 project are listed in  figure 9.   Project development  begins  with land
 use permitting,  air quality permits  and water quality permits.   Each  of
 these  need specific information  on the project  such as the number and
 type of engines  proposed, type of gas processing,  emission levels of  all
 pollutants and volumes  of condensate generated.  Detailed engineering is
 not required until after all of  these permits are  obtained.

 Once the above three types  of permits are received, detailed plans and
 specifications can be prepared and submitted to the local building
 departments for  review.  Although this can  be time consuming, permits
 are generally  given for projects that are considered environmentally
 sound.   If the permit and detailed engineering  phases  are done
 sequentially,  the project can take well over a  year for these two phases
 alone prior to construction.   GRS has generally submitted all of the
 permit applications and at  the same  time has continued with  detailed
 engineering.  The  ideal .is  to receive the water quality and  emission
 permits at the same time as the  building permit.  A risk in  trying to
 carry out  several functions concurrently is  that detailed engineering
may have to be redone several  times  to comply with  the requirements of
 the local  jurisdictions reviewing the submittals.
                                   L-15

-------
                                Figure 9
                                       CONCERNS
                         PCR PROJECT DEVELOPMENT
- LAND USE PERMIT
       - Corrpatibility with land use on and around landfill
       - Noise
       - Fire  Protection
       - Flooding/Drainage
       - Foundations
       - Other Environmental Inpacts

- AIR QUALITY

       - Landfill Emissions
       - Migration Control
       - Emissions of NOx, CO from LTO Project itself

- WATER  QUALITY

       - Disposal of Condensate

- BUILDING PERMITS

       - Foundations
       - Building Type, Appearance
       - Noise  Insulation
       - Fire Protection
       - Security
       — Landscaping
                                   L-16

-------
 5.  Lggg^/ciiiiiitfujlal concerns
 A list of these factors is shown in figure 10.  The gas lease agreements
 and power purchase agreements will determine how easy the project will
 be to finance later on.  An  important issue is the assignability of the
 contracts.  If limited partnerships are set up, the contracts must rake
 provisions to allow a new legal  entity to step in and take over all of
 the obligations of the primary developer.  Utilities are generally
 nervous when this happens and require in sore instances recourse to the
 original developer in the event  that the partnership has a problem.
 This is especially true in levelized capacity contracts which include
 penalties for non performance.

 Another issue includes the term  of the contract.   The gas lease and the
 power purchase agreement should  have the same time period.

 As regulations relative to the migration of landfill gas become more and
 more stringent,  the liability and who assumes it  can become a major
 negotiating point.  If possible,  landfill gas developers should attempt
 to mitigate against gas migration and the emissions from the  landfill
 but the ultimate responsibility  should remain with the owner  of the
 landfill.  Who ultimately has the responsibility  will affect  the
 financing of projects.  Long term environmental impairment insurance is
 either very expensive or not available.  Bankers  tend to view this
 negatively.

 The tax issues,  such as who takes the Production  Tax Credits  (PTC),  can
 affect the financial attractiveness of a project.   The internal rate of
 return of a project which takes  these tax credits can be significantly
 increased.   For private landfills,  the Production Tax Credits could be
 used in lieu of royalty and can  be worth much more than the royalty
 income.   Whether these credits will continue past the year 2000 remains
 to be seen as the U.S. Congress  reviews the whole question.   Currently.
 a  landfill generating 1 million  cubic ft.  of landfill gas per day would
 yield over Siso.ooo per year in  Production Tax Credits.

 The issue of PTC's has had a significant impact on the development  of
 landfill  gas projects especially by those company's that had  an
 appropriate tax appetite.  In fact, projects that had normally  negative
 cash flows  could become profitable primarily due  to the PTC's.

 Capital Costs

GRS's historical cost of electrical generating plants while originally
decreasing  started to increase from 1985 on steadily decreasing per
 installed KW as shown in Figure  11.  In 1983, when GRS's first
electrical  generating project was built at Menlo  Park, California,  the
total cost  of the project was a  little over $1.25 million per MW output.
This  included the gas processing,  filtration equipment,  gas collection
system  (50+ wells),  electrical interconnect, all  internal combustion
engines, generators, all switchgear and building  to house all of the
equipment.
                                   L-17

-------
                          Figure 10
                  EEGAL/CQWERCIAL CONCERNS
                   FOR PROJECT DEVELOPMENT
 - GAS LEASE AGREEMENTS

       - Term of Agreement
       - Royalties
       - Assignability
       - Environmental Liabilities

 - POWER PURCHASE AGREEMENTS

       - Following Interconnect Priority Procedures
       - Curtailment Provisions
       - Pricing
       - Penalties - Long Term
       - Assignability
                         TAX ISSUES


- PRODUCTION TAX CREDITS
                           L-18

-------
 In 1984. when two additional projects were built, at Guadalupe, Santa
 Clara County. Ca and Newby Island, San Jose, Ca, the total installed
 cost was over $1.15 million per KW output.  This cost was further
 reduced to SI.07 million per MW in 1985 when two more plants were put on
 line at American Canyon. Napa,  Ca, and Mountain View. Ca.

 In 1988, the 20 MW Coyote canyon steam generating plant cost $1.3
 million/MW.  Again, this Includes a fully operational power plant with
 all buildings and landfill gas  collection system as veil as all of the
 changes that occurred due to plant modifications resulting from air
 quality issues.

       Gas Processing costs

 Figures 12 and 13 show our experience in gas processing.  The primary
 determinant in gas processing equipment is the volume of gas that is
 processed per day.  A secondary variable is the processing pressure.  A
 plant handling 5 million cubic  feet of landfill gas per day at 70 psi is
 5 times as expensive as  one handling 1 to 1.5 million cubic feet per
 day.

       Operating Costs

 Figure 14 shows our operation cost experience over the last 8 years.
 When  we began operations with new equipment in 1982,  operating costs
 were  a little less than  2 cAwhr;  last year (1991),  they had increased
 to about 2.7 c/kwhr,  which  represents about a 4% per year compounded
 growth rate, or a growth rate consistent with inflation.   These  figures
 include all of the reciprocating  projects.   Additionally,  the overall
 operating costs have been increasing steadily over the last 4 years or
 so following a buildup of a maintenance  organization capable of  carrying*
 out more and more of the engine maintenance and operations functions.
 Additionally,  the 2.7 cAwnr  includes all of the field maintenance.
 operations and monitoring required to operate the projects.

 We have found that there is no such thing as an unmanned plant.  The
 only way that 80 to 85*  capacity  factors can be maintained is by having
 a  plant operator present at least 8 hours per day.   (An 80% capacity
 factor  as we define it, means that the plant is producing at its rated
 output  during 80% of  the total number of hours in a year.)   The  function
 of the  operator is to assist  in general  maintenance of the engines and
 to repair the gas collection system.  .

The steam generating project has not been included in these statistics
since it   is manned 24 hours per day,  7  days per week and uses a
different  technology.  Its operating costs  have tended to be about 15%
 less than  the small reciprocating plants.   Although GRS has 5 gas
 turbine projects,  the total operating time  has not been long enough to
establish any kind of history.  Thus far however,  we believe that the
gas turbine plant operating costs will be conparable to the
reciprocating projects.
                                    L-19

-------
                                 Figure 11
  $/MW
(MILLIONS)
1.5
1.4
1J
1-2
1.1
 1
0.9
08
0.7
06
0-3
04
03
0.2
01
 0
                    ELECTRICAL PROJECT
                               COST PER MW
                                                      SSfiSSg.X
                                                      r-xvxwx-
                                                      •vBfiffiH'.v
                                                      • •%%%••••
                                                      :2xix&

                        ss-m
                        x-x<-x°2
                Ml
                  1983
              1984
.•-•.-.• -.-.NV
>>:•:•-S:::::
^« • • • • • • i
SSSS:
        %¥fe^«
        i§E§fe"®

                                                1988
         1990
                                L-20

-------
                          Figure 12
                       GAS PROCESSING COSTS
                  VERSOS PRESSURE. VOLUME OF GAS
Project
Bradley*
Menlo Park
Guadalupe
Newby Island I
American Canyon
Mountain View
Nevby Island II
Madiura BID
Rotary Lobe
Reciprocating Conp.
Dollar Cost
(1,000's)
1.000.000
25.000
150.000
80.000
222.000
372.000
300.000

220.000
250.000
Pressure
(psi)
70
2
25
8
90
90
45

14
20
W Cu ft/day
Gas Vol.
5.0
1.4
1.1
1.4
1.0
2.3
2.0

1.89
1.89
   *Built by GRS but sold in 1990,
                          Figure 13

                  GAS  COMPRESSION COST
                                VS PRESSURE
S (MILLIONS}
                                                                  Vol: 5 MM

                                                                  cu ft/day
                                                                 Vol: 1.5-2.0

                                                                MM QJ ft/day



                                                                  Vol: 1-1.5
                                                               j  MM cu ft/day
                           -30	40	SO  SO  70  60

                             PRESSURE OUTPUT (PSG)



                              L-21

-------
                                  Figure 14
C/KWHR
  3
2.8
2.6
2.4
2.2
  2
1.8
1.6
1.4
1.2
  1
0.8
0.6
0.4
0.2
 0
               1984
                          OPERATING COSTS
                                  AUL PROJECTS
                                      I
            1965
1986
1988
1989
                      1987
                       YEAR
LABOR  -  MAINT& REPAIR    o  MISC/ECUIP. LEASE
1990
1991
                                                              TOTAL
                                      L-22

-------
 When we began operating, ve believed that given the requirement of an
 operator  at each plant, as  the size of the plant increased, labor costs
 would tend to decrease as a percentage of total operating costs.  This
 did not happen because as the size and complexity of the plant increased
 so did the size of the gas  fields, engines, and gas compressor/
 refrigeration systems required to fuel the engines which in turn
 required  considerably more  labor to operate them.  As emission
 requirements became more and more restrictive, low compression systems
 changed to high compression systems,  and naturally aspirated engines
 changed to high compression turbocharged engines.

 The three major components  of operating costs include labor,
 maintenance/repair (this includes parts,  consumables such as oil.  and
 any work  done by outside contractors),  and miscellaneous equipment
 leases.   The last category  includes leasing and rental of equipment  such
 as backhoes, pipe welding machines and any other type of specialized
 equipment.  Other cost components that make up the total operating costs
 include site specific variables such as property taxes,  utilities.
 insurance and other miscellaneous costs.

       Total Capital Cost

 For the purpose of evaluating a hypothetical 1.000 kv project, a capital
 cost distribution shown in  figure 15  was assumed.  Further,  the  assumed
 project total cost is $1.5  million per MW output.  Based on  GRS
 experience,  the breakdown of the cost is fairly accurate and represents
 how the $1.5 million would  be allocated.   The gas collection system  is
 approximately 13% of the total project cost; 80% is the  cost of  the
 equipment and building.  This includes all gas processing equipment,
 engines,  generators, switchgear and building to house the equipment on a
 fenced half acre site.  The balance or 7% of the project cost is for
 interconnect,  legal and environmental fees.

 Income statgnent/operatlng  cash flow

 The  income statement for a  typical operating year for the hypothetical
 1.000 kv  plant is shown in  Figure 16.   Also listed are the assumptions
 including the electrical sales rate (7.0  cents/kvhr). and royalty  (10%).
 and on line  time. (80%)

The net income after tax (at  50%)  is, approximately $61.000.   The
operating cash flow,  once depreciation  is added back to  net  income,  is
almost $211,000.

The Internal Rate of Return.  (IRR)  as defined in this paper  is the rate
of return  in which the discounted operating cash flow over the first 10
years of  the project is exactly equal to the original investment.
                                 L-23

-------
                                Figure 15
                         CAPITAL
                      HYPOTHETICAL 1.000 KW PLANT
Item                                     Cost               %

COLLECTION SYSTEM                  $  200,000             13.3
FEES-PLANNING/ENVIRONMENrAL            15.000              1.0
LOCAL FEES                             15,000              1.0
INTERCONNECT COST                      75,000              5.0
GENERATING EQUIPMENT                  970.000             64.7
CONTINGENCY                           225,000             15.0

TOTAL                              51,500,000           100.0
                                   L-24

-------
                                Figure 16

           ECONOMICS OF 1,000 KW ELECTRICAL GENERATING PROJECT
 ASSUMPTIONS

 KW OUTPUT (NET)                      1,000
 CAPITAL COST                    1,500.000
 GAS REQUIREMENT  CFT/DAY           700,000
 ON LINE TIME                           60%
 OPERATING COSTS  C/KWHR                2.0

 ELECTRIC RATE C/KWHR                  7.0
 KWHRS/YR                        7,446.000
 ROYALTY                              10.0%
 DEPRECIATION (YEARS)                    10

                        TYPICAL  INCOME STATEMENT

 REVENUES                         $490,560      100.0%

 EXPENSES
          OPERATING COST           140,160       28.6%
          ROYALTY                   49,056       10.0%
                     SUBTOTAL      189,216       38.6%

 GROSS MARGIN                      301,344       61.4%

          SG&A (6%)                  29.434        6.0%
          DEPRECIATION              150.000       30.6%

 OPERATING PROFIT                  121,910       24.9%
 TAX  (50%)                           60,955       12.4%
 NET AFTER TAX                      60.955       12.4%

         DEPRECIATION              150.000       30.6%

OPERATING CASH FLOW                210,955       43.0%
                                   L-25

-------
 In computing the IRR, a number of additional assumptions  have been
 incorporated.  The assumed operating costs do not include major capital
 investments in the project that will be required over its operating
 life, vhich in this case has been assumed to be 10 years.  These
 investments include major engine overhauls, and major repairs to the gas
 field such as additional gas wells and/or major replacement of  a
 significant portion of the field.

 Our experience has been that a 1 Miff plant would cost about $80,000  to
 carry out a complete major engine overhaul after 3 years of operation.
 Typically, major gas field investment tends to occur about 4-5 years
 following the original installation.  Consequently, in evaluating the
 financial feasibility of a project we capitalize the investment in
 carrying out both the engine overhaul and gas field repair and
 depreciate each of these investments over 3 and 5 years respectively.

 Finally, in evaluating the effect of various parameters on the internal
 rate of return, and return on net assets, the effect of financing has
 been neglected.  Throughout the analyses I have assumed that 100%
 equity.

 Factors Influencing Tntetnal Rate yf Rgturn

 Figures 17 to 20 illustrate the effect of various assumptions on the IRR
 of projects.

 Enerov pricing (figure 17) is by far the greatest influence on the  IRR.
 At 7 c/kwhr each 1% increase in the price of electrical  energy per  year
 results in about a 10% increase in the TRR.   Operating costs,  (figure
 18) effect the return to a much lesser extent.  A 10% decrease in the
 operating cost results in approximately 8% increase  in the TRR.
 Decreasing capital costs (figure 19) has a similar effect.  A 10%
 decrease in capital expenditure at the beginning  of  the  project  results
 in improving  the TRR by 20%.

 Improving operating on line time has somewhat greater impact on  TRR. A
 10% change in operating on line time results in approximately a  20%
 change  in TRR.

 Finally,  taking advantage of the Production Tax Credits  can also have a
 significant impact on the TRR since the credits can  be worth several
 million dollars over the life of the project.

                        o&s
The future of landfill gas projects is very dependent,  as it has always
been on the sales price of the  product whether that  is  electricity or
medium BIU fuel.  Based on GRS's experience, landfill gas projects need
to be over 1 MW. and have an electrical price of at  least 6 to 7 cents
per Jcwhr including any capacity payments.  Royalties, at this energy
pricing should not be higher than  12.5%.  If higher  royalties are
offered, the percentage should  be  a function of energy  pricing. over and
above the b^g* energy rate as inflation takes place.
                                    L-26

-------
                            Figure 17
       30%
       28%
IRR%
                     ENERGY PRICING
                            EFFECT ON OW
                                                             8c/kwhr
                                                             7c/kwhr
                                                             6c/kwhr
                                                        10%
           At 7c/kwhr. each 1% annual increase in energy revenues results in
                       about 10% increase in the IRR.
                            1-27

-------
                           Figure  18
       30%
       28%
       26%
IRR%
            •zn
                     OPERATING COST
                              ErFcCTCNIfW
                    0%         10%
               % CHANGE
At 7 c/kwhr energy, a 10% decrease in operating costs
        results in an 8% increase in IRR
20%
                                                                 8 c/kwhr
                                                                 7 c/kwhr
                                                                 6 c/kwhr
                             L-28

-------
                   Figure 19
-20%
             CAPITAL COST
                 EFFECT ON IRR
-10%
                                                    Sc/kwhr
                                                    7cykwhr
                                                    6c/kwhr
10%
                  0%
             % CHANGE
At 7 c/kwhr energy, a 10 % decrease in the capital cost
  results in approximately a 20% increase in the IRR
20%
                  L-29

-------
                                 Figure  20
IRR%
        2% I
        0%
             -2C%
                          ON LINE TIME
                                EFFECT CNIRR
05%
                                                I
0%
5%
          ->C%      -5%
             % CHANGE
At 7 c;kwhr energy, a >0% decrease in On Une time
    results in an over 20% decrease in the IRR
                                                                     8c/kwhr
                                                                     7c/kwhr
                                                                     6c/kwhr
10%
                                    L-30

-------
Projects  should make economic sense without  the tax credits.   Further,
evaluation and economic analysis  should be done over a 10 year period.
The  IRR of projects should be as  high as possible excluding the cost of
money,  if all of these conditions are met the  project has a  fairly good
chance  of succeeding, provided however that  the on  line time  is over 80%
per  year.

Future  problems for landfill  gas  projects which will add to the capital
costs are all  of the environmental concerns  that have to be satisfied.
The  reduction  of emissions frcm the projects and the treatment of
condensate all cost a great deal  of money but add nothing to  the
revenues.

Operating costs must be controlled.  We have found  that the only way
that this can  be done is to develop a maintenance staff and carry out
all  of  the equipment repairs  in house.  Unless plant operations
personnel  are  available 24 hours  per day to  respond to  problems, the
capacity  factor cannot  be  kept over 80%.  A  kvhr not produced is lost
forever.   The  plant cannot be run to catch up.

In summary, gas recovery projects can be developed  and  developed
profitably, not only for the  developer, but also the landfill owner if
some of the basic economic realities are kept in mind and both are
willing to work together.
                                     L-31

-------
References
Berenyi, Eileen.. Gould Robert.,  1991—92 Methane Recovery Fran
YftfUt'9Qlc- published by Governmental Advisory Associates* 1991
                                 L-32

-------
                                     APPENDIX M

                  WASTE MANAGEMENT OF NORTH AMERICA, INC.
                        LANDFILL GAS RECOVERY PROJECTSi

                                   Michael A. Markham
                               SEC Donohue - Oakbrook Division
                                   Lombard, Illinois
 INTRODUCTION

 Organic materials contained in garbage that is disposed of in sanitary landfills throughout
 the U.S. decomposes by an anaerobic (oxygen deficient) bacterial process which emits gas
 as a byproduct.  This gas, commonly known as landfill gas (LFG), is composed primarily of
 methane (45-60%), carbon dioxide (35-50%), nitrogen (0-10%), and oxygen (0-2%).  In
 addition there are many minor volatile and sulfur bearing constituent compounds found in
 LFG.  Landfill gas is colorless, however, it does possess a pungent odor.  The specific gravity
 of LFG is very close to that of air, therefore it does not readily rise  or sink when released to
 atmosphere.

 LFG does not pose a threat to society as long as it remains within the landfill or is controlled
 properly.  If LFG should leak through the landfill surface, or through  a break in the landfill
 ground liner, it could seep through surrounding soil formations and  accumulate in pockets
 creating the potential for an explosion.  In addition, EPA has  determined that LFG contributes
 significant quantities of methane to the atmosphere which  increases the global warming
 effect.

 A positive aspect of LFG is its content of methane which Is also found in natural gas.  The
 heat content of LFG, by direct relationship of its methane  percentage, is about half that of
 natural gas.  However, there are many applications where natural gas as the traditional fuel
 can be substituted directly with LFG.  Waste Management  of North  America, Inc. (WMNA)
 has committed itself to utilizing LFG to produce usable energy from what was once a
wasted resource.  WMNA is committed to the development of LFG recovery plants wherever
they are economically feasible. WMNA uses landfill gas primarily for the production of electric
energy, and in a few cases, for direct sale of medium BTU gas for boiler or process fuel.
Where  the  project economics prohibit a positive  return, most sites resort to collecting and
burning the LFG in a flare.
         iThis paper was presented at SWANA's Fifteenth Annual Landfill Gas
   Symposium held in Arlington, Virginia on March 24-26, 1992.

-------
  LANDFILL GAS ASSESSMENT

  Prior to developing any LFG recovery project, the volume of gas available must be quantified,
  or a reasonable estimate established, in order to size the plant and choose the necessary
  equipment. This estimate will also be required when negotiating a power or gas sales
  contract with an electric utility or end user.

  There are three ways to estimate the quantity of gas that  can be generated within and
  recovered from a landfill: (1) model theoretical gas production, (2) conduct an active LFG
  flow test, and (3) install and maximize gas from a full LFG  collection system. The first
  method involves using known  information about the tonnage and make-up of the refuse
  material placed in the landfill over its life. Other factors include the integrity  of the landfill
  cover material and the moisture content of the refuse.  Information can be  estimated for
  past data if unrecorded, and for  future  data, to establish a gas generation  curve over thirty
  (30) years.  Obviously, materials  that are readily decomposable, such as residential trash,
  paper pulp and sewage sludge, will decompose faster and  generate gas  at a quicker rate
  than other materials such as industrial waste, plastics and  construction debris.  Landfills
  containing more of the  rapidly biodegradable materials will tend to have  faster gas
  generation rates and, therefore, gas generation curves that rise quickly, peek early and drop
 off rather steeply.  Other landfills with materials which will decompose more slowly will have
 lower gas generation rates and generate less gas early, but extend usable gas production
 for many  more years.

 The moisture content of the buried refuse and landfill surface integrity will also  greatly affect
 the  rate of decomposition,  and thus gas generation, and must be considered  a major  factor
 when estimating LFG generation rates.   Very moist, saturated materials tend to provide an
 ideal environment for the microbes  that carry out the bacterial process that change
 complex organic compounds into methane and carbon dioxide.  Dry refuse will be slow  to
 decompose and generate methane.  Modem landfills, by virtue of design, are liquid tight due
 to the principal of "the less liquids in. the  less chance of liquids out.' This is primarily a
 response to older, poorly designed landfills whose liner and  surface cover  allowed landfill
 liquids to escape into the soils and underground water table.  Because of their inherent
 design, state of the technology landfills have been likened  to tombs'  of garbage, that
without liquids will never decompose, reduce in volume, and remain monuments of our
society. 2

For LFG generation, liquids are  essential.  However, for LFG  collection, liquids  can be a
detriment and therefore should be studied closely when  determining the recoverability of the
         2New sites with the composite liners as required by Subtitle D of RCRA can
   enhance landfill gas production through leachate recirculation and other landfill gas
   enhancement approaches.   However, the majority of existing sites do not have
   composite liners.

-------
  LFG generated within the landfill.  High liquid levels within a landfill will reduce the amount of
  slot line which can be designed into LFG wells and thereby reduce the available area that can
  be influenced under vacuum. In a new well with low liquid levels, the suction of gas to the well
  can draw landfill liquids to the well that not only drown slot line, but also carry silt and debris
  to the well and infiltrate its gravel pack, thus reducing the well's effectiveness  even if liquid
  levels can later be lowered.  For WMNA LFG recovery, landfill liquid levels have been the major
  difference for many projects between efficient gas recovery and a continual struggle of
  replacing  watered out wells.

  The WMNA LFG program started in 1982 with one test crew dedicated to determining the
  amount of LFG at WMNA sites.  During the period of 1986 through 1988 when WMNA
  employed three LFG  test  crews to travel the U.S. and conduct LFG flow tests to support or
  contrast existing theoretical gas generation curves.  Typically, a series of three to  four wells
  and four to five shallow probes per well were drilled in the landfill in a triangular or diamond
  pattern.  Gas was then extracted from the wells for several weeks  or  months at varying
  vacuum levels while taking gas samples, temperature and flow readings at each well, and
  pressure readings at  each probe.  From this data, as well as an examination  of  the material
  that was removed during the drilling of each well, a gas generation  model for the entire
  landfill was  extrapolated.

  WMNA soon discovered that good collection system considerations  were as critical as good
  estimates  of gas production in Veal world" experiences.  Inconsistent designs and improper
  installation of gas collection systems,  as well as changing landfill  operating  patterns, caused
 some  recoverable gas estimates to fall short and facilities to be oversized.  This  lead WMNA
 to realize  that the best  estimate of available gas could be obtained with the installation of  a
 complete LFG well field, collection system and flare.  The flare blower pulls a vacuum on the
 well field and the gas flow to the flare is measured using either orifice plate differential
 pressure readings or a Pitot tube pressure measurement.  From this actual flow,  the LFG
 recovery plant can be sized to accurately reflect the condition of the gas collection system.
 This method of determining available LFG, though definitely more accurate, takes much longer
 and requires more up-front resources (i.e. design and installation of well field,  gas collection
 system and flare).
 LFG PROJECT DEVELOPMENT

 Economics

The economics of all  potential WMNA gas recovery projects are examined closely over the
life of the pending electric or gas sales contract, typically ten years.  Using estimates for
initial capital expenditures, electric sales revenue, income tax credits for renewable  energy
usage,  and predicted costs and schedules for equipment maintenance, a complete project
"proforma"  is developed  to determine the financial  return.  A discounted cash flow payback
period  of ten years or less is desired for project development.   However, intangible benefits,
such as positive public relations and environmental image, are always considered.

-------
  Electric Power Plants

  To date, WMNA has twenty-one (21) landfill gas to electric energy plants and four (4)
  medium BTU LFG sales facilities. Electric generation plants have been the most attractive to
  develop, however not without drawbacks.  Electric utilities are located everywhere, so finding
  a reliable customer for the electric energy is not difficult.  Most landfill gas projects hinge on
  the price of the  electric sales to the  local electric utility, which can vary widely across the U.S.
  The electric energy is sold to the utility in the service area of the  landfill.  By virtue of being a
  small power production "qualifying facility", utilities are  required to buy the electricity as
  mandated under the Public Utilities Regulatory Policies Act (PURPA). However, the Federal
  Energy Regulatory Commission (FERC) rulings have stipulated that the utilities only have to
  pay the "avoided cost"  of energy they currently produce, (i.e. the cost of their displaced
  fuel) or new capacity. As a result,  not all utilities offer buy-back rates that can make a
  project viable.   Buy-back rates can  be flat rates throughout the year,  may have on-peak and
  off-peak time variations, or may have seasonal variations.  When the utility company is
  facing  the  need for  added generating capacity, a capacity payment may be obtained for the
  reliable delivery  of a committed power level.  In some cases, the  electricity can be
 transported through  one utility's system  and sold  to a second utility, otherwise known as
 "wheeling"  power.  For  most project development, the lowest allowable average levelized buy-
 back electric rate is approximately $0.025 per kilowatt-hour  (kW-hr).  If a reasonable
 electric rate can not be found in the area, most projects are not developed.

 Gas Sales Plants

 The second alternative pursued by WMNA for utilizing LFG as a renewable energy source is
 the sale of the gas to an end user for fuel in  a boiler or other process stream.  The primary
 hurdle to developing a LFG sales facility  is locating a consistent user of the gas within a
 reasonable distance of the landfill. Finding a customer that will be willing to take all of the
 LFG that the landfill can  deliver, twenty-four hours a day, year round, is  a major difficulty.  If
 the customer is  intermittent or cannot use all  of the recoverable  gas. then the gas must be
 collected and flared in order to control gas migration.  The landfill's cost to collect and flare
 the gas for control is basically the same  as for gas recovery, however, no sales revenue is
 being generated. Large  industries such  as automobile  and chemical plants that operate
 around  the  clock are good potential  customers. However, the landfills must be located
 within a few miles of such facilities.  Other potential users of LFG are trash burning power
 plants and incinerators that can utilize LFG as a base  fuel to perpetuate and stabilize the
 burning of the waste materials.  For most projects, a reasonable LFG price for both the
 landfill and the customer can be reached; as with most cases, the LFG would displace
 another fossil fuel such as coal or natural gas. The price of the  gas would reflect the
 landfill's need to  offset the cost of installing and maintaining the LFG well field/gas collection
system, gas compression/cleanup system, and gas delivery pipeline depending on how the
agreement is structured.   In the final  analysis, the location of a reliable user of the LFG within

-------
 a fairly close proximity to the landfill is the major obstacle for developing a medium BTU gas
 sales plant.

 Production Tax Credits

 Another principle factor that has enhanced the potential for developing LFG projects is the
 U.S. Federal Government Production Tax Credits (PTC) for renewable energy sources such as
 landfill and bio gases, and waste gases from oil wells,  natural gas wells, and coal mines.
 These PTC's are based on the "barrel of oil equivalent" (BOE) of energy that is produced.  A
 typical 3 megawatt (MW) turbine/generator using  2.0  million standard cubic feet per day
 (MMSCFD) can generate close to $325,000 in PTC's per year. Because the PTC's are applied
 on an after-tax basis, their equivalent value on a pre-tax income basis are much greater.
 PTC's account for approximately one-third of the revenue stream for a typical LFG project.

 By current law, there are three principle rules that must be adhered to in order for a landfill
 to qualify  for the PTC's through the year 2002:

       1)    The gas collection system must be substantially complete by the end of  1992.
             Most landfill gas collection  systems that will be designed and installed strictly as
             a result of the new U.S. EPA Clean Air Act regulations, will not qualify for PTC's
             unless the qualification date is extended.

       2)    The landfill gas must be  utilized for a beneficial purpose (i.e. power, steam or
             heat production that would otherwise require another source of energy).

       3)    The benefit from the use of the landfill gas must be gained by others beyond
             the recipient of the PTC's (i.e.  landfills cannot generate power for their own
             operations and claim PTC's for the gas).  Primarily, landfills must sell the gas, or
             the rights to the gas, to an unrelated third party.

WMNA takes advantage of the PTC's at  LFG fueled electric power  plants by selling the gas to
a third party* joint venture  between WMNA and Caterpillar Financial Corporation (CAT
Financial) called Bio-Energy Partners (BEP). WMNA develops the project and builds the plant.
Soon after the plant is operating, CAT Financial acquires all of the equipment and the power
producing portion of the facility from WMNA. WMNA .then sells LFG to BEP, who in turn
produces the electric energy and sells  it to the utility.  BEP also make lease payments for the
use of the  equipment to CAT Financial. WMNA maintains the role  of managing partner by
operating and maintaining the facility and LFG well field/collection system.

Lobbying efforts are being made to convince U.S. Congress to extend the qualification
deadline for the  PTC beyond 1992 and to extend the tax credit period beyond the year
2002.  If the PTC's are not  extended or replaced by other incentives many of the potential
LFG  recovery projects, at WMNA sites and otherwise, will probably not be developed  for

-------
 energy production.  The landfills required by the proposed EPA Clean Air Act regulations to
 collect and control LFG emissions may opt to install the much less expensive equipment
 necessary only to dispose of the gas by flaring.  This would be a  great loss of a relatively
 untapped alternative energy source.
 LFG RECOVERY PLANT EQUIPMENT

 Standard Designs

 In 1987, the WMNA landfill gas recovery program had estimated the potential for up to
 eighty (80) gas recovery plants by the early 1990's.  To better prepare, WMNA adopted a
 philosophy of  using  a "standard plant" design to offset repetitive  architectural and
 engineering costs associated with the design of such a large number of facilities.  The
 "standard design"  primarily incorporates separate fuel gas collection/compression
 system(s) room, gas turbine or engine/generator(s) room, a viewing room and/or control
 room, all enclosed in a concrete block building.  Located outside would be the utility
 interconnect with high voltage transformer and switchgear, as well as some of the ancillary
 equipment such as turbine air intake filters, engine radiators, exhaust silencers, gas aerial
 coolers, and waste liquid holding tanks. The fuel gas  compressor  room is designed to meet
 National Electric Code (NEC)  Class 1, Division  2 requirements for hazardous environments.
 The motive for the use of the concrete block is two fold; first, to provide maximum noise
 attenuation from the operating equipment, and secondly, to provide  an aesthetically  pleasing
 image for public relations  purposes.  Some of the more recently built facilities, mostly the
 smaller plants, have modified  the "standard design" to reduce project capital costs in order
 to generate  a  more  attractive financial payback over  the project life.

 WMNA's twenty-three LFG fueled electric power plants all use  combustion engine technology
 developed by either Solar  Turbines,  Inc. of San Diego, California (gas combustion turbines),
 or by Caterpillar Inc. of Peoria, Illinois (internal combustion reciprocating engines). At these
 twenty-three sites,  WMNA has twenty-five (25) Solar Centaur turbines (4500 hp, each),  two
 (2) Solar Saturn turbines (1200 hp, each), and twenty-four (24) Caterpillar 3516  SITA
 engines (1138  hp, each).  The installed capacity of these electric  generators is  approximately
 96 MW of power.  Through the end  of January 1992, this equipment had accumulated nearly
 750,000 hours of operation.

 After the initial  turbine plants were installed in Wisconsin in 1985 (Omega Hills and Metro)
 and the initial engine/generator plant was installed in Colorado in 1986 (County Line),
 Caterpillar and  Solar Turbines  continued to improve the technology that had been developed
 for LFG fuel service.  Caterpillar continued to make adjustments to the engines to  ensure
 necessary maintenance and overhaul intervals would be cost effective.  Solar continued their
 development of the Saturn turbine that allowed WMNA the  option of a smaller LFG fueled
turbine/generator unit.  Based primarily on the commitment of these two companies to

-------
 WMNA's LFG recovery program, the Solar Centaur turbine and the CAT 3516 engine were
 chosen as the standard equipment for future LFG fueled power generating facilities.

 Utilizing standard model equipment at the plants allows for shared experience to minimize
 duplication of the learning curve, allows holding joint training seminars for plant operators
 from around the country, and makes possible common stocking of major spare parts.  All
 equipment operating problem details from the WMNA  plant monthly operating reports can
 be pooled to determine if a particular problem experienced is identical among all units and, if
 so, a common solution can be engineered to resolve the matter.  WMNA also holds annual
 seminars for their plants operators to provide training  and information on subjects  such  as
 turbine, engine, and compressor operations and maintenance, electrical system trouble
 shooting, plant safety, lubricating oil analysis, and environmental  policies and procedures.  In
 addition, open round table discussions are encouraged to have operators share new ideas,
 air common grievances, and promote  cooperative relationships between facilities.  Lastly,
 WMNA stocks a spare turbine  engine and gearbox,  spare blowers, compressors, large
 compressor electric motors, and a spare reciprocating engine in order to reduce downtime
 resulting from major equipment failures.   If the equipment at each plant were different, each
 site could not afford to stock their own spares.  Awaiting equipment repairs or new
 equipment from the factory at the  time of a failure could cost the program hundreds of
 thousands of dollars in lost electric revenue and tax credits each year.

 Turbine/Generator Standard Equipment

 The most widely used turbine/generator at WMNA plants is a Solar Centaur GSC4500 LFG
 fueled  turbine/generator set. The turbine is  a slightly modified natural gas, simple cycle,
 single shaft, industrial turbine engine; the only major modification made to the natural gas
 version turbine was to double the fuel gas control system components and fuel injectors and
 to enlarge the fuel gas manifold in  order to  account for the LFG  fuel having approximately
 one half the heat value of natural  gas. The turbine/generator set is rated at  4500
 horsepower (hp), and is supplied with a 3000 kW generator, 4,160 volts, 60  hertz,  0.8
 power factor.   The turbine  at rated output  and standard  conditions (600 feet above sea
 level, 50 degrees  Fahrenheit (°F) ambient air temperature and standard inlet and exhaust
 duct losses) requires approximately 40 million BTU's per hour (MMBTU/hr), lower heating
 value (LHV), or about 2 MMSCFD of landfill gas at 480  BTU/SCF.

 The other turbine/generator set in use by WMNA sites is a Solar Saturn GSC1200R LFG
 fueled turbine/generator.  This turbine  model is an exhaust heat recuperated  cycle turbine
 rated at 1200 hp.  Again, the turbine is basically a natural gas turbine with a modified fuel
 system  to account for the lower heat value of the LFG fuel.  The electrical generator is rated
,at 950  kW. The Saturn typically requires approximately 11  MMBTU/hr (LHV) at rated
output and standard conditions.   Both Saturn turbines  at WMNA plants are installed as the
Second turbine/generator unit at the site.

-------
 Engine/Generator Standard Equipment

 As mentioned previously, WMNA uses the Caterpillar 3516 SITA engine at facilities where
 reciprocating engines are installed. This engine is a slightly modified spark-ignited natural gas
 engine, four stroke cycle, V-16 cylinder configuration, turbocharged aspirated, and after
 cooled. The engine is rated at  1138 brake horsepower (bhp), operates at 1200 rpm
 synchronous speed, and is supplied with an 800 kW generator, either 480 or 4160 volts.
 Two versions of the CAT 3516 SITA engine  are currently available. One version, the "high
 pressure" model, requires 35 pounds per square inch gauge (psig) fuel  pressure to the
 engine where a standard type carburetor mixes the fuel and combustion air.  The second
 version, a "low pressure" model,  requires only 2 psig fuel pressure at the engine where the
 fuel/air ratio is controlled in a special mixing valve at the air intake  prior to the
 turbocharger.  This "low  pressure" model retains the  full power rating of the standard engine
 and actually uses slightly less fuel.  However, the  primary advantage of the "low pressure"
 model is the lower power consumption of the landfill  gas collection/compression system that
 must compress the gas to only 2 psig verses 35 psig for the standard  "high pressure"
 model.

 The exhaust from the CAT 3516 engines is  not cataliticly treated, however,  the engines do
 utilize lean-burn technology that allow nitrous oxide (NOX) emissions to  approach  Caterpillar
 quoted levels of 2 grams per brake horsepower-hour (g/bhp/hr)  for the "high pressure"
 engines.  Field exhaust emission tests on "low pressure" engines have shown that NOX levels
 of 4 g/bhp/hr are easily achievable. The engine emission levels are a function of the engine
 timing,  air/fuel ratio, and the specific fuel gas composition.  WMNA projects permit air
 emissions based on the EPA New Source Performance Standards (NSPS) for stationary
 equipment that limit any one pollutant to 250 tons per year.  For reciprocating engines,  the
 limiting pollutant is NOX.  For most areas, this limits the number of engines at a facility to
 four high pressure engines or three low pressure engines in order to stay below 250 tons
 per year NOX.  Beyond  these limits, the permit application would require a fairly elaborate,
 extensive, and often expensive, review under the Prevention of Significant Deterioration (PSD)
 program.  For this reason, planned facilities with enough available gas to support more  than
four engines often decide to use combustion turbine technology, which emits much less NOX
and slightly less carbon monoxide (CO) at  comparable horsepower than reciprocating
engines, rather than submit to the PSD review.

Fuel Gas Compressor Systems

The required fuel  pressure at the  Centaur turbine is typically 175 psig which is delivered
jsually by a dedicated fuel gas compressor  (FGC)  system.  Most  Centaur FGC's are rated
 or 1800 standard cubic feet per minute (SCFM) at an inlet gas pressure of 6 inches of
 nercury vacuum and a  final discharge pressure of 185 psig.  Except for the first four
 -.ystems built, WMNA's Centaur FGC's utilize a two stage compression process using a

-------
 positive displacement, rotary lobe blower first stage and an oil injected,  screw type
 compressor second stage.  Prior to the plant, each gas collection system has an
 underground liquid knockout tank to collect the major portion of liquids that are carried off
 the landfill with the gas.  Inside the plant, an inlet scrubber vessel, primarily a large vessel for
 velocity reduction with a stainless steel wire mesh pad, removes additional liquids and
 paniculate (dirt and debris).  After each  stage of compression, the gas is cooled in an aerial
 heat  exchanger to  further remove moisture  from the gas. Injected oil  and gas are
 separated after the second compression stage and  prior to cooling.  Liquids and  paniculate
 are removed again from the gas  in a gas filter after cooling.  Prior to exiting the FGC
 system, the gas is reheated in a gas-to-gas heat exchanger by hot gas  exiting the oil/gas
 separator vessel.   This raises the gas temperature 20 to 40°F above the gas dew point to
 ensure that no liquids form prior to reaching the turbine.  Finally, a final gas filter (0.3 micron
 absolute) mounted just  prior to  the turbine/generator acts  as the last barrier for
 paniculate and water remaining in the gas.  No additional gas treatment other than
 compression, cooling, filtration, and reheating are performed.

 Of the twenty-five Centaur FGC systems, seventeen use Sutorbilt blowers for the first stage
 of compression and Howden compressors for the second. Another three FGC's use Roots
 blowers for the first stage, and again, Howden compressors for the second stage.  The
 most recent  FGC system installed for a Centaur turbine utilizes a Roots  blower first stage
 and a Dresser-Rand  TVC, an oil  injected, screw type compressor, for the second stage.
 Additionally,  WMNA's first four Centaur turbine power systems used a Roots blower for the
 first stage of compression,  and Hall reciprocating compressors for second and third stages
 of gas compression,  yielding the  same rated discharge pressure and flow.

 Reciprocating engine  FGC systems are very similar to the turbine fuel compressors in design
 philosophy, however,  the engines require much less fuel at much lower delivered gas
 pressures. Because  of this/most engine/generator facilities  utilize a single FGC system for all
 of the engines installed at the site. For the "high pressure"  engines, two different systems
 are in use: (1) a two stage,  rotary lobe  Roots  blower system rated for 400 SCFM  at one
 site, and (2)  a single  stage system with two Dresser-Rand TVC oil injected, screw
 compressors in parallel rated for 1600 SCFM at two sites.  The first system supplies gas for
 a single 3516 engine, whereas the second supplies fuel gas for four 3516's.  Both deliver the
 gas at 35 psig to the engine and utilize the same compression/cooling/reheat philosophy as
the turbine FGC's.  In 1991, however, the engine facilities did not utilize the final gas, 0.3
 micron filter as the turbines do.

The "low pressure"  engine plants also use a  single FGC system for all of the installed engines.
 However,  because the required fuel pressure is only 2 psig, a single stage rotary lobe blower
 is used.  The single blower FGC  system takes the gas from a vacuum  and boosts  it to
approximately 7 psig, cools, filters and reheats the gas and delivers it to the engines at 2
 psig.  All of the "low pressure" FGC systems have been built using Roots  blowers.  Vessel and
cooler sizes have been adjusted  to two  standard systems rated at 800  and 1200 SCFM.

-------
 The 800 SCFM system can supply fuel gas for 2 to 3 engines at full load depending on the
 BTU value of the gas.  The 1200 SCFM system  is sized for 3 to 4 engine facilities.

 Plant Operations

 In budgeting operations at WMNA's LFG recovery plants, two operating criteria are reviewed
 annually to predict plant output for the approaching year: (1) equipment on-line time, and
 (2) plant capacity.   Plants are required to anticipate equipment  routine maintenance,
 operational problems, major overhauls and gas  well field changes in order to estimate
 energy delivered to the utility or gas sales to the end customer.  These energy delivery
 projections are used to budget revenue.  In addition, each plant must submit a budget for
 expenses required to operate and maintain the  facility.

 Equipment on-line time is a determination of equipment availability taking into account
 equipment maintenance, potential operating problems, and any planned changes to the
 system (i.e.  installation of a new generating unit that would require downtime to make the
 electrical tie-in). WMNA's equipment is typically budgeted to operate ninety-three percent
 (93%) of the time.  This 7% of equipment in operation, or downtime, includes all equipment
 and facility maintenance, and all  potential operating problems. To reiterate, 93% on-line is
 0£l the budgeted plant availability, but is a budgeted time for each individual turbine or
 engine/generator to be producing power.  For facilities in their first year of operation,  the
 expected on-line time is reduced to 85% to allow for completion of start-up related
 problems or  changes, and also to allow the plant operator to build experience and
 confidence in his job without undo pressure.

 Even though the budgeted on-line times are 93%, many of WMNA's facilities have exhibited
 that better performance is possible.  Nine of WMNA's nineteen facilities in operation for the
 full year in 1991 operated above the budgeted level.  One facility,  the DFW turbine/generator
 plant in Lewisville, TX, operated at an equipment on-line time of 98.5% for the year.  Overall,
 turbine/generator equipment averaged 93.9% on-line time excluding well field/gas collection
 system problems, and 86.0% including them.  Engine/generator  equipment for 1991
 averaged 95.5% and 89.6% on-line times excluding and including, LFG well field problems,
 respectively.

 Budgeted plant capacity, as well as plant on-line time to some degree, is in direct relationship
to  the volume of LFG fuel that can be recovered.  LFG, as the fuel, is the singular factor that
 determines the power output level that the plant can sustain.  For facilities with power
 capacity greater than the available gas volume,  this results in operating the generating
equipment at some partial load below full rating.  If the gas shortage is even more severe,
shutting down individual generating units  may be required. This must be considered when
budgeting plant  performance  and equipment on-line time.

-------
  For facilities with LFG supplies that are ample enough for full plant output, budgeting power
  output, and therefore energy sales, should be more predictable.  For reciprocating engine
  driven generators, power output is primarily fixed by the rating of the equipment, and
  ambient conditions play little role affecting capacity. However,  because the first step in the
  thermodynamic process of a gas turbine is to compress the combustion air prior to ignition,
  cooler air which  is more dense and less humid requires less compression work to be
  performed by the turbine,  and allows more work to be converted into electrical energy
  output.  Therefore, ambient temperatures affect gas turbine driven  generator outputs
  dramatically from season to season, and from geographical location to location.  In summer,
  with ambient temperatures averaging 80 to 90°F in the daytime,  and 60  to 70°F at
  nighttime, average expected Centaur turbine power output would  be  2800 to 2900 kW.  In
  winter with much colder ambient temperatures, WMNA has experienced Centaur turbine
  output improvements by as much as 600 kW.  At the DFW plant in Texas, and an inlet air
  evaporative cooler is used in  late Spring and Summer to lower inlet  air temperatures to
  60°F. (Because of the principles evaporative  coolers work under,  dry, warm air conditions
  create the most  efficient conditions for their use.)  Budgeted power capacities assume
  average climatic conditions for each facility, however, nature does not operate on averages.
  As a  result, weather conditions can affect plant performance, but over the year, the
  conditions  average out.
                   •
  Other operator controlled factors may also improve plant  performance.  On  average WMNA
  knows that the plant parasitic loss, that is the power to operate the  FGC and facility lights,
 heat,  etc.,  for a  turbine/generator facility is about 17%, for  "high pressure"
 engine/generator facilities, about 13%, and for "low pressure" engine/generator facilities,
 less than 10%. Some turbine facilities with multiple generating units and FGC's, have
 manifolded the FGC systems together with cross-over valves. This allows the facility in
 conditions of LFG shortages to operate all generating units from fewer FGC's, thus reducing
 parasitic load.  Additionally, the cross-over valves allow maintenance on one FGC system,
 typically required more  often than turbine maintenance, to be performed while  operating the
 associated turbine off of excess capacity from the other FGC systems.  At other facilities
 that operate under day to  night on-peak and off-peak  utility rate  changes, lost electric sales
 due to planned maintenance outages can be minimized by performing work at night when
 rates are  lower.  Each of these operational variations  improves plant net performance and
 maximizes energy output sales to the utility.

 OPERATIONAL PROBLEMS

 Since WMNA projects began operating in 1986, much experience has been gained through
 experience regarding problems with operating and maintaining LFG recovery equipment.
 Three  (3)  operational problems that have been encountered  by  WMNA, two which remain a
 continual struggle, greatly affect plant capacity,  equipment maintenance costs, and
equipment on-line time.

-------
  Fuel Gas Compressor Oil Carryover

  In April 1988, WMNA learned through experience, the effects of oil and liquid carryover into a
  turbine engine.  It was discovered after a turbine failed at the Omega Hills gas recovery
  plant in Menomonee Falls, Wl, that a black, carbon buildup was developing at the turbine fuel
  injector tips.  The turbine had 21,000 hours of operation  and had been inspected by Solar
  field service personnel four months previously.  It was determined that the cause of failure
  had been carbon deposits at one  injector tip sufficient enough to divert the  fuel gas path to
  the area between the inner combustion chamber and the outer turbine liner.   This diverted
  gas acted as a torch and eventually burned a hole in the side of the turbine.  As a result of
  the failure, precautionary measures, primarily removal, inspection and cleaning of all fuel
  injectors at quarterly maintenance  intervals, were established.  This maintenance, added
  significant equipment downtime which  in turn reduced electric sales revenues.

  An equipment evaluation at Omega Hills was also made.  It was determined that the FGC
  process, which utilized reciprocating compressors with oil drip lubricators, was at fault and
 that modifications could be made without changing the major system  components which
 would improve liquid and oil removal from the gas prior to reaching the turbine.

 Before the new modifications could be thoroughly tested, another turbine experienced a
 failure from the same cause.  This turbine, located at the GROWS facility outside Philadelphia.
 failed with a little more than 17,000 hours of operation and incorporated a FGC system with
 an oil injected, rotary screw compressor, rather than  a reciprocating  compressor.  Turbine
 fuel injectors  had been inspected and cleaned quarterly; this indicated that sufficient carbon
 deposits to cause a failure could accumulate faster than the operator was  removing them.

 By the time a complete failure analysis could be performed, the results of the FGC changes
 at Omega Hills were apparent; the oil and liquid carryover to the turbine had been reduced
 almost 100%.  The principle component achieving these results was a  final fuel gas filter
 manufactured by Pall Well, that was installed in the turbine room just  prior to where the gas
 enters the fuel control system on the turbine skid.  It  was immediately decided to retrofit all
 of the existing turbine systems with the filter to prevent future turbine failures.

 Most of the filters have now been in service  at least one  year and all  indications are that
 they are performing very well. Turbine fuel injectors remain so  clean that only semiannual
 spot checks are made for fuel injector carbon buildup.  The final analysis is that WMNA
 turbine facilities have removed a potential failure mode and reduced the amount of
 necessary maintenance downtime.
Reciprocating Engine Ash Deposits

Through the experience of Caterpillar and WMNA, the choice of lubricating oil for the CAT

-------
 3516 landfill gas engines has been primarily standardized to a modified natural gas engine
 oil.  The oil has extra additives to prevent attack from corrosive chlorine, fluorine and sulphur
 bearing compounds found within the landfill gas fuel.  An oil consisting of a total sulphated
 ash content of approximately 1% and with a nominal total base number (IBM) of 10 has
 been found to be ideal for combating engine acids formed by these compounds.  Oils with
 higher  TBN and ash content will maintain their acid neutralizing effects longer and thus
 lengthen oil change intervals.  However, experience has shown that excessive  ash in high TBN
 oils can have a detrimental effect to the cylinder heads over time.  Oils with low TBN and
 ash, similar to standard natural gas engine oils, tend to be depleted of their  neutralizing
 agents within several hundred hours and therefore make oil changes frequent and cost
 prohibitive. Most WMNA engines are on 750 hour oil change intervals, but are modified
 depending on the makeup of the landfill gas fuel.  Oil analysis for metals, TBN, oxidation,
 nitration, viscosity, and water content  taken at several intervals between oil changes also
 benefit the plant operators in deciding when to change oil and filters.

 Even the 1% total sulphated ash oil that is in current use leaves hard, white deposits on the
 cylinder heads,  piston crowns, inside the  exhaust manifold  and on turbocharger wheels and
 housings.  The  deposit material has been tested and determined to be a combination of oil
 additives and silica.  The oil  is apparently "blowby* getting past the piston rings  and/or
 through wear in the intake and exhaust valve guides.  The silica contribution  to the formation
 of the deposits remains in debate.  Some people are convinced that the  silica is carried with
 the  LFG from the landfill  in gaseous form, and thus cannot be filter out.  Others argue that
 the  silica is brought in with the intake  combustion air.  However, oil analysis of off road
 vehicles in much worse service environments compared to oil analysis of stationary LFG
 engines inside an enclosed building do not support the air intake claim.

 Many theories have been proposed on how best to reduce the deposit buildup. Caterpillar
 believes that dehydration of the LFG fuel by refrigeration will remove the silica from the gas,
 and thereby reduce the deposit material strictly to oil ash which is common for all natural
 gas  engines.  WMNA has installed a gas dehydration unit at one facility which appears to
 have reduced maintenance levels. WMNA has recently installed a Pall Well filter at one engine
 site  similar to the  turbine fuel gas filters.  Not enough operating experience has occurred to
 make even a preliminary judgement  of the filter's performance. WMNA, in conjunction with
 Caterpillar  recommendations,  has also tried water injection into the engine cylinders to
steam clean the deposits from the heads and  pistons; preliminary conclusions suggest that
this might have some merit  if  starting with a new engine with minimal oil consumption and no
initial deposits.  In a final  case, WMNA has had a complete cylinder head and piston crown
coated  with a ceramic material that prevents the  deposits from adhering to the metal; to
date, this option seems to offer the most promise, however, the cost of the coating might
prove excessive for the benefit derived.

In the end, it  appears that the deposits accelerate the formation of even greater deposits.
As the engine breaks in and oil begins to blowby the  piston rings, and wear occurs in the

-------
 valve guides, silica begins to react with the oil to form deposits on the piston crown and
 head.  As the deposits increase, areas of deposits begin to flake off and exacerbate wear
 between the cylinder liner and piston rings, and between the valve stems and guides. As
 more wear occurs, more oil enters the piston chamber and  more deposits are formed, which
 in time create more wear; the cycle soon  becomes circular and deposits theoretically
 increase exponentially.

 Current maintenance schedules call for top end overhauls at 8,000 to 9,000 hours of
 operation.  Most cylinder heads, when removed at this time, are covered by deposits up to
 1/8 inch thick.  The cylinder heads are typically replaced with rebuilt heads, however deposits
 from the top of the piston must be removed.  The deposits are usually so hard that only a
 hand-held grinding wheel can remove them in a timely manner.

 Prior to planned maintenance, several operating problems can  result from the deposits.
 Pieces of flaked-off deposits get lodged between exhaust valve faces and seats and prevent
 full closure of the valves; this small opening provides a path for hot  gases and flames to
 escape during the combustion stroke and causes concentrated heat stress, or "guttering*,
 to occur.  Deposits on piston crowns as small as 1/8 inch can  change the effective
 compression ratio of a cylinder and cause detonation or pre-firing; this can have many
 negative mechanical effects on the engine.  Lastly, turbocharger wheels with several
 thousand hours of operation typically  exhibit grinding marks on the  blades from contacting
 deposits on the housing.  If grinding is severe, the turbo wheel may become unbalanced and
 wipe out the entire wheel and/or the bearings.   All of these resultants of the ash/silica
 deposit buildup cause increased downtime, equipment maintenance costs and lost electric
 revenues.  WMNA  continues to search for  the answer to these  problems.

 Gae Well field/Collection Systems

 As mentioned previously, LFG well field, collection system, and  gas shortfall problems are the
 primary factors that determine the relative success of the project.  However, because of the
 uncertainty of predicting future landfill  operations and volumes,  the complexity of designing
 gas well fields and  collection systems,  and  the difficulty in hiring, educating, and retaining
 proficient well field  technicians, many times this factor is the most difficult to control.  All of
the well field/gas collection system problems in  1991  combined to total nearly  100% of
WMNA plant output reductions and 56% of all equipment downtime.

Many landfills have installed gas control systems and flares to  prevent LFG migration from
 :he landfill property.  Under these circumstances, collection of nearly  all of the gas is
 Daramount to succeeding with the task.  Consequently, the "quality"  of the gas collected is
 )f  minimal importance to the operation of the flare.

 :or LFG recovery however, the quality of the gas, that is the content of the primary
 onstituents  i.e. methane, carbon dioxide, nitrogen, and oxygen, is of utmost importance to

-------
 prevent short term equipment malfunctions, to  promote long term equipment life, and finally,
 to ensure that LFG generation will continue and be productive for many years in  the future.
 WMNA LFG well field systems are typically tuned" to maintain 53 to 54% methane in the
 total gas "quality"  at the plant.  Lower methane concentrations  give rise to higher carbon
 dioxide, nitrogen and oxygen levels.  Oxygen in the plant can create risks due to  potential
 explosions if in high enough quantities, and can accelerate oxidation of the equipment from
 corrosive attack. Rise of carbon dioxide, nitrogen  and oxygen levels can  indicate breaks in
 the landfill cover material, breaks in the gas collection system, or more  importantly, stress
 of the  bacterial microorganisms within the landfill due to air intrusion.   If excessive, air
 intrusion into the landfill can slow or stagnate the gas generating bacteria for many years
 before they can regenerate and begin producing usable LFG  again. Air intrusion  in its worst
 extreme can also create underground oxidation, a landfill fire.

 Many LFG recovery and power plants are  installed to replace or substitute gas control  flare
 systems.  Certain  assumptions are made during the project  development of the  power
 facility regarding plant output over the life  of the pending utility  contract,  usually  for ten
 years.   However, LFG fuel quality or collection system limitations may not allow the power
 plant equipment to extract the necessary fuel to operate the plant at the expected level.  If
 so, economic expectations of the facility will not be met.  If ample fuel can be extracted from
 the landfill  to operate the facility at maximum output, the gas recovery plant may not be
 performing  its function to collect all of the gas being generated and thereby controlling LFG
 migration.

 At one WMNA  location it is necessary to operate both turbine/generator units at a partial
 load to control gas migration.  However, because  of the inefficiency of the turbines operating
 below full load and design flow restrictions  of the FGC systems which require operating  both
 FGC's  and therefore create higher plant parasitic loads, plant output levels are less than
 could be achieved  using only one turbine/generator.  As a  result, plant electric sales surfer to
 maintain gas migration control.

 Determining the  capacity of LFG electric generation facilities  is a delicate cooperative effort
 between estimating the volume of generated and recoverable  LFG, designing the gas well field
 and collection system,  and sizing the eventual LFG fueled power facility and equipment.  All of
 these factors will affect the operation and  performance of  the power plant once completed.
 Unfortunately, each of these three  factors may  be considered independently; 1)  by a gas
testing  or assessment group that estimates the volume of gas being generated, 2) by the
 collection system design engineer that  places the locations of the recovery wells  on the site
 plan and sizes the  collection system header, and 3)  by the project manager who decides the
size of the facility and what power generating equipment will be  installed.  If these parties do
not communicate effectively in the  early stages of the project, the results at times have been
a landfill with off-site gas migration problems, a gas collection system that is supplying
 100% of its design flow,  and a power  facility operating below the expected plant output
capacity;  no one benefits in this scenario.
                                         M-15

-------
 Another well field and collection system problem that affects LFG recovery is the continual
 battle of installing and maintaining gas wells and collection systems in active landfill areas.
 After gas  wells and collection header pipe are installed, many landfills are permitted vertical
 expansions that allow more refuse to be  deposited on  top of the existing collection system.
 Wells can be extended, but only with solid pipe, thus reducing the effective zone of the well to
 the lower  portion of the landfill.  Collection header pipe, however, usually  gets buried below
 twenty, thirty, even forty feet of new trash.  Pipe breaks or collapses due to settling of the
 new refuse  usually dictate new header systems to be installed because the total depth below
 the surface  is prohibitive.  Other times, a  section of landfill with gas wells that has been
 inactive for  a time will be reopened; the area around the well will be exposed creating
 potential for air  intrusion.  As a result of  these problems, power  plant equipment may be
 required to  shutdown or reduce output levels in  order to perform collection pipe repairs or
 prevent pulling oxygen into the landfill.
 Landfill gas, arguably, is a potential hazard, and less arguably, is a nuisance odor.  LFQ has
 also become a fuel for electric power generation.  However, LFG recovery must be able to
 co-exist with landfill operations, control gas emissions into the atmosphere, and provide
 usable fuel for power generation.  At WMNA facilities, as well as most other gas recovery
 operations, power generation sales account for only a fraction of the total landfill revenues.
 In addition,  odor and gas migration control may be part of operating permit requirements,
 and will definitely affect public relation efforts.  As a result, landfill operations and gas
 migration control will not be compromised to benefit  power generation.
Gas well field, collection system and gas shortfall problems pose the greatest challenge to
LFG recovery power generating facilities with  regard to equipment performance and overall
project success, as well as achieving the dual purpose of maintaining gas migration control
from the landfill site.  Gas recovery facilities will always walk a fine line between being
oversized for the volume of available LFG and operating below full output capacity, and being
undersized and not able to control  odors and gas migration from the landfill property.  A
delicate balance between these two goals must continually exist.
                                         M.ic

-------
                               APPENDIX N

            1-95  LANDFILL  GAS TO ELECTRICITY PROJECT
                  UTILIZING  CATERPILLAR 3516 ENGINES1

                               Bill  Owen
                     Michigan  Cogeneration Systems
                          San  Diego, California

 Introduction  and  General  Overview
 The I-95 Landfill is  operated by the County of Fairfax,  Virginia and  is
 located  approximately 25 miles  south of  the  nation's capital.  The  facility
 is owned and operated by Michigan Cogeneration Systems Inc. (MCS)  of
 Novi, Michigan.

 The facility began commercial operations  in January 1992  and consists of
 four (4)  Caterpillar 3516 spark  ignited engines, each capable of producing
 800 Kw.   The facility utilizes  landfill gas  (LFG) as  its only fuel source and
 produces 3200 Kw  gross. After internal  parasitic losses  the facility nets
 approximately  3050  Kw  for export to the local  utility, Virginia Power.
 The facility is operated and maintained by one full time  employee of  MCS.

 History   of   Project
 Since the  mid 1980's the County of Fairfax had attempted to work with
 several developers in an attempt to develop a LFG  to energy project  at the
 I-95 Landfill.

 In February 1990 the County  issued an RFP from which MCS was selected
 as the most qualified bidder.  In  December of 1990 MCS and the County
 executed an agreement giving MCS the gas rights to the landfill.  MCS
 began  engineering the project in late February and synchronized with the
 utility in  late November,  approximately 10 months.  The month of
 December was used to wring out the system, and MCS went into
commercial operations in January 1, 1992  selling firm  capacity and
energy to Virginia Power under  a 20  year contract at an average rate of
5.2 c/kWh.  The cost of the project was  approximately $3,200,000.
      iThis site  was featured  on the  landfill gas  tours as part of the Solid
Waste Association  of  North America's fifteenth  annual Landfill Gas
Symposium held in Arlington,  Virginia on  March 24-26, 1992.

-------
 Landfill  and  Landfill  Gas  System
 The 1-95  Landfill  is an active landfill which receives nearly 5,500 tons of
 refuse per day.   The landfill is adjacent to  Route 1 and Interstate 95 and
 is north of the Occoquan River.  The landfill is titled in  the  name of the
 United States with the District of Columbia as the "beneficial  owner".
 Fairfax County runs the landfill through  a Memorandum of Understanding
 between  the two  governments.

 The landfill was opened in 1972.  The landfill has  since expanded to 290
 acres with nearly 17.5 million tons  of refuse in place.

 An  Energy Resource Recovery Facility has been constructed at  the site and
 is currently burning 3,000 tons per day of the  refuse stream.  The plant
 currently produces 70  Mw of power for  sale to Virginia Power.

 The County operates  a perimeter collection system consisting  of
 approximately 50  wells.  This system is operated to provide off-site
 landfill gas  migration  protection  and  has extraction  wells  both within and
 outside the refuse.

 The  main  collection system  is operated and  maintained by the County
 under contract to  MCS.  The main collection system currently consists  of
 15 vertical wells  covering approximately  22  acres.  The wells  vary in
 depth from 50 to  100  ft.  Since  commercial operation  began (1/1/92) the
 collection  system has  provided 100%  of  the power generation  systems
 needs.  The power generation station  consumes 1150 cfm of landfill gas.
 For  the first three months of operation the gas continues to maintain its
 high  quality at approximately 55-58% methane.   As part of the County's
 closure plan for a  portion of the landfill, an additional 65  vertical wells
 covering 70 acres  will  be  installed later this  year.  MCS intends to use the
 additional gas  from these  wells in a second  3  MW facility.

 Gas  Preprocessing  and   Energy   Plant  Equipment
 MCS's spent considerable time examining the other landfill gas to
 electricity  projects in an effort to establish  a clear  design philosophy
from  which we would build our plant  The  result of our investigation was
that  many  of  the projects which  were encountering problems paid little or
no attention to the  proper selection of equipment for the application.  The
                                     N-2

-------
 utilization of used  outdated  equipment for the  sake of capital savings is
 the fundamental  reason for  project problems at a variety of sites.

 Based on the technical  review of the projects visited by MCS  coupled with
 MCS's own operational experience from our 6.6 MW landfill gas recovery
 project in  Michigan,  MCS developed a design philosophy for the project.
 MCS's philosophy was  to utilize equipment which was  of proven design and
 which was  specifically  adapted for use on landfill gas.  The following is
 the culmination  of our  effort.

 Landfill  Gas   Handling   and  Preprocessing
 The main consideration relative to the gas handling system  was to provide
 the Caterpillar engines gas  at a minimum of 2 psi,  filtered,  and free of
 liquids.   This meant  that other than  providing good  filtering  of the gas to
 remove silica and  participates, that no "processing"  of the gas was
 required.  A block  diagram describing the system is provided for ease of
 reference.   The  gas first enters a primary  filter separator which removes
 all free liquids as well  as particulates down to  1.0 microns.  The gas then
 enters the  100 hp  blower at approximately 90 °F and is compressed to 6
 psig.  The gas is then cooled in a forced air gas cooler. Any liquids which
 may drop out during the cooling process are removed by a trap and
 collected in a condensate storage  tank.  The gas then passes through a
 temperature control valve where  its temperature is maintained at a
 preset level for emissions control.  The gas  then enters the final gas
 coalescing  filter where  any free liquids are once again removed as well  as
 particulates  down to 0.3 microns.   The gas is then transported by a
 stainless steel  header to each of the four Cat engines.   Due to corrosion
 concerns, all gas piping in the plant is stainless steel.

 Engines
 The engines selected for the project were the  Caterpillar 3516 spark
 ignited engines.  The engines were selected based on their proven
operating  history on  landfill  gas and their low gas  pressure requirement
of only  2 psig.   The operating history from  sites utilizing the 3516
engines showed  that the engines were exceeding Caterpillar's major
maintenance intervals for top end overhauls.  The engines were getting
between  12,000 - 14,000 hours between  top end overhauls.  The engines
were  also operating at  greater than  90% availability for each of the sites
reviewed.   The low gas fuel pressure of  2 psig was an additional economic
benefit since comparable  engines require 30-40 psig  fuel pressure  which
                                       N-3

-------
Gas from
 Landfill
                 Primary
                  Filter
                       n
Drains
                        Condensate Tank
                                                     Blower
                                                     Recycle
                                                     Valve
                                                                                           Gas Temperature
                                                                                             Control Vafve
                                                               Gas Cooler
                                                                                    I   N>ain
                                                                              Final
                                                                              Fitter
                                                                                                                                  • To Engines
                                                                                                                               Drains
                                                                  1-95 Process Flow

-------
 creates greater  system complexity and  greater parasitic losses  due to gas
 compression.

 The Caterpillar 3516  has a nameplate rating of 1138  hp/unit with a
 corresponding output  of  800 kW  at the generator  terminals.

 The engines were approved by the local air pollution  control district  who
 generally  supported the  concept  of landfill gas utilization.

 Performance/Availability
 The overall  plant performance has been exceptional to  date and  has far
 exceeded our initial  target of 90% availability.   The first two months of
 operation  have produced overall system  availabilities of 93% and 98% for
 January and February. The engines have been exporting between 3050-
 3100 kW  net.

 The maintenance on the engines is being performed by  MCS according  to
 Cat's recommended maintenance procedures and intervals.  Oil change
 intervals are determined  by  measuring the TBN level in the oil.
 Caterpillar recommends changing  the oil  when the  TBN level reaches  half
 of its original level.  Oil  changes  have been performed at between 650-
 750  hours per engine for the first two months.

 Environmental/Emissions
 The  engines were permitted by the Virginia Department of Air Pollution
 Control.  The  engines are permitted for the following  limits:
      rCK        2.0   grams/hp hr
      00         2.04  grams/hp hr
      NMHC      0.461 grams/hp  hr

 in order to maintain the  engines emissions at a constant level,  it is
 necessary  to control the  combustion air to  fuel  ratio  to the engines at a
 constant level.  By maintaining the air to fuel ratio  at a fixed relationship
 the engines always see the  same fuel mixture and therefore produce  the
 same emissions.   This is accomplished  by  maintaining  both the  air inlet
 temperature and  the gas  inlet temperature  to the engine at constant
 preset levels.   These  preset temperatures are maintained by use of
temperature control valves.  By controlling  these parameters, the air to
fuel  ratio and therefore the  engine emissions remain constant regardless
of  ambient temperature changes.
                                     N-5

-------
 Facility   Expansion
 MCS is planning to expand the facility to produce an additional 3 MW of
 power.  The  development work  for phase II is  currently  underway with the
 second plant  scheduled for operations January 1993.  Based on the
 operating  history of the initial  15 wells,  MCS is very confident that the
 additional  65 wells planned by the will provide more  than enough fuel for
 the second phase.

 Discussion
 MCS believes that the formula for  success for landfill gas to  electricity
 projects involves two key factors or ingredients.

 The first is the  proper  sizing of  the  plant relative to  the  amount of
 landfill  gas the landfill is expected to produce.   A major  problem for many
 sites was the oversizing of their facilities  relative to the actual  landfill
 gas  volumes  recovered.  MCS has attempted to  avoid this pitfall by using
 actual gas recovery rates  from the collection system in  lieu  of theoretical
 calculations.  The use  of theoretical gas projections  without  any
 supporting data  from actual  well  tests is very risky.

 The  second is the selection of  the proper equipment and  material  for the
 application.  This  included the Caterpillar 3516  engine, stainless steel gas
 piping,  and high efficiency gas filters.  By utilizing these proven types of
 engineering equipment, it significantly  improves the  longterm success of
the project while reducing  annual maintenance costs.
                                  N-6

-------
TECHNICAL REPORT DATA
ffteae read Imttruetiotu on the reverse before com/tie tint)
1. REPORT NO. 2.
EPA-600/R-92-116
.. TITLE AND SUBTITLE
Landfill Gas Energy Utilization: Technology Options
and Case Studies
. AUTHORIS)
Don Augenstein and John Pacey
PERFORMING ORGANIZATION NAME AND ADDRESS
EMCON Associates
San Jose. California 95131
^SPONSORING AGENCY NAME AND ADDRESS
SPA. Office of Research and Development
Air and Energy Engineering Research Laboratory
Research Triangle Park. North Carolina 27711

6. REPORT DATE
June 1992
6. PERFORMING ORGANIZATION CODE
B. PERFORMING ORGANIZATION REPORT NO.
10. PROGRAM ELEMENT NO.
11. CONTRACT/GRANT NO.
68- Dl- 0146, Task 15
13. TYPE OF REPORT AND PERIOD COVERED
Task final: 3/91-3/92
14. SPONSORING AGENCY CODE
EPA/600/13
SUPPLEMENTARY NOTES AEERL projectofficeris SusanA> Thomeloe. MailDrop63. 919/
541-2709.
       The report discusses technical, environmental,  and other issues associated
with using landfill gas as fuel,  and presents case studies of projects in the U. S.
Illustrating some common energy uses. The full report begins by covering basic
.ssues such as gas origin,  composition,  and means of collection; environmental and
•egulatory background is presented. Properties of handfill gas as a fuel are review-
id; equipment that can utilize landfill gas is discussed. The report then describes
ucperience with six projects in the U. S.  where landfill gas has been used for ener-
y. It also references literature on other landfill'gas energy projects of interest.
Conclusions regarding uses of landfill gas for energy are presented.
KEY WORDS AND DOCUMENT ANALYSIS
DESCRIPTORS
Dilution
irth Fills
ises
tels
iergy
fuse
Decomposition
Methane
Carbon Dioxide



iase to Public
b.lDENTIFIERS/OPEN ENDED TERMS
Pollution Control
Stationary Sources



Unclassified
20. SECURITY CLASS (This pagt)
Unclassified
c. COSATI Field/Group
13B 11M
13C 07C
07D 07B
21D
14G

21. NO. OF PAGES
189
22. PRICE
  m 2220*1 <»-73)
N-7

-------