PART 270 SUBPART G - INTERIM STATUS
DOC: 9528.02(83)
Key Words: Interim Status, Post-Closure
Regulations: 40 CFR 270.70
Subject:
Addressee:
Trip Report: Region X - Procedures for Evaluating Proposed
Expansion at Interim Status Facilities
Kenneth A. Schuster, Chief, Land Disposal Branch, Office of
Solid Waste (WH-565-E)
Originator: Arthur Day, Acting Program Manager, Land Disposal Branch
Office of Solid Waste (WH-565-E)
Source Doc: See Miscellaneous (9560.09(83) Question #7]
Date:
Summary:
8-10-83
The procedures for evaluating a proposed expansion in capacity at an
interim status facility are under $270.70. An increase in design capacity
requires the approval of the Regional Administrator which oust be based on a
finding that there is a lack of available treatment, storage or disposal capacity
a majol
-------
e*3)
7. Khat aro^tho prr>ccc*ures £oc j?v? luatiny a proposed
nxpanslc;>in capac^y At an interim status facility?
Section £S0.72 (fccnerly 5122. 23(c)) contains these
procedure!*, An increase in design capacity requires
the in-roval of th« Regional AcVinistratcr. This nfprn
rust be bnsod on a finding that" there ifl a lack of
nvailablo treatront, storage', or rlisjyosal capacity at
hazardous waete nanavcn iC no liquid has pvep been collectPd
prnviousl^a. The Agency believe*? that a significant
propcrt icSjt of prohlers aseociated with scil-pcre liquii-f
ronltorinrj Novices (p^ir-arlly ly^inoters) result fron
rr ire til 1^ t irn ar^ oror^tlcn. If the syaten
to prortucp ^-"-flJis, tno inscailation and operation
cf the* sysf*" should he c/refiillv examined.
As part of litigation proceedings , we are evaluating th«
inherent limitations' of poll-pore liquid rcnitoring
device^; the outcone «£ thin evaluation ray be a variance
fron soil-pore liquid rcnircring In limited situations.
In the intfrtn, an
------- |