A	United States	Office of	December 1996
CvFPA	Environmental Protection	Administration and
Agency	Resources Management
Management Review
Innovative Regional Structures
A Preliminary Assessment of the FY'95 Regional Office Reorganizations
U.S. EPA Region 8
Technical Library 80C-L
999 18th Street, Suite 500
Denver, CO 80202-2466
pared by:
: Innovative Regional Structures Review Team
1 by Organization & Management Consulting Services
ice of Human Resources & Organizational Services
ember 13, 1996
Printed on Recycled Paper

-------
TEAM MEMBERS
This report was prepared by the following members of the Innovative Regional Structures Review
Team, who represent offices from all across the U.S. Environmental Protection Agency.
Office of Administration and Resources Management
Ruth Alene Soward, Project Director
Office of the Comptroller
Timothy Gonzales
Office of Enforcement and Compliance Assurance
Katrina Cherry
Office of the General Counsel
Craig Annear
Office of Regional Operations and State/Local Relations
Jim Wieber
Office of Water
Cynthia Puskar and Pat Bonner
Region I
Stephen Perkins
Region V
Jane Neumann and William Muno
Region VII
Richard Devoe
Region VIII
Wayne Anthofer, Jane Chadbourne, and Kerry Clough
Region IX
Mike Schulz
Region X
Barbara McAllister

-------
SPECIAL THANKS
	«»9990<*»i»	
The Review Team thanks the EPA managers and staff who gave time,
observations, perspectives and information during the course of this review, and
who offered constructive advice and feedback on the Agency's processes for
reorganizing.
Also, we thank the representatives from State, Tribal, industry, and
environmental groups across the United States who provided the Team their
observations and perspectiveson how the Regional reorganizations have affected
their programs and relationships with EPA's Regional Offices.
Finally, we thank the foil owing managers and staff who assisted the Review Team
during the course of this reviews:
Dave Alexander, OARM; Dennis Devoe, OECA; Justina Fugh,
OGC; Pam Ringhoff and Laurel Seneca, Region /; and Bill
Glasser and Catherine Krueger, Region X.

-------
Management Review: Innovative Regional Structures
December 13, 1996
TABLE OF CONTENTS
EXECUTIVE SUMMARY	 1
INTRODUCTION	11
CHAPTER 1: Analyses and Overarching Observations — Strategic Priorities 	17
CHAPTER 2: Analyses and Overarching Observations — Reinvention Priorities	33
CHAPTER 3: Analyses and Overarching Observations — Accountability And Integrity .... 47
CHAPTER 4: Analyses and Overarching Observations — Processes For Reorganizing	53
CHAPTER 5: Other Issues 	59
CHAPTER 6: Conclusions And Recommendations	65
APPENDICES	75
Appendix 1: Summary of Recommendations	77
Appendix 2: Region-Specific Observations	81
Appendix 2a: Region-Specific Observations: Region VIII 	83
Appendix 2b: Region-Specific Observations: Region VII	97
Appendix 2c: Region-Specific Observations: Region X 	Ill
Appendix 2d: Region-Specific Observations: Region V 	125
Appendix 2e: Region-Specific Observations: Region I 	137
Appendix 3: Concerns and Observations of Headquarters Offices 	157
Appendix 4: Glossary of Terms 	167
Table of Contents

-------
Management Review: Innovative Regional Structures	December 13, 1996
Table of Contents

-------
Management Review: Innovative Regional Structures
December 13, 1996
EXECUTIVE SUMMARY
PURPOSE:
Deputy Administrator Fred Hansen requested a preliminary assessment of the Regional
reorganizations implemented in FY 1995 to:
•	Identify the lessons we have already learned about what works, what does not.
•	Note what changes hold the most promise for the future work of the Agency.
•	Recommend what steps we might take to continue these innovations in other parts
of EPA.
A cross-Agency Review Team visited a sample of five of the seven Regions that reorganized in FY
1995.
OBSERVATIONS:
The Review Team focused its observations on programs, issues, and initiatives in three primary
areas: Strategic Priorities, Reinvention Priorities, and Accountability and Integrity. For each
of these three areas, this report includes a chapter that describes the Team's observations and
analysis in more detail. In addition, the Team made a number of observations about the Regional
Offices' processes for designing and implementing their reorganizations, which are included in a
chapter called Processes for Reorganizing. Finally, the Team made several other observations
which did not fit clearly into these four chapters. These observations are included in a chapter called
Other Issues. Highlights from these chapters are as follows:
STRATEGIC PRIORITIES:
•	Community Based Environmental Protection (CBEP) has found a home in each Region,
through specific structures (Regions I, VIII, X) and team approaches. Organizing around
CBEP may hold some advantages in promoting resource commitment to this priority.
•	Reorganizations generally consolidated Pollution Prevention activities, providing a home
and, in some cases, visibility, focus and increased resources.
•	Organizations with dedicated State and Tribal offices or units were perceived by States and
Tribes as being farther along in, and more committed to, building partnerships.
•	It is too early to tell which of the two enforcement reorganization options (i.e., central
coordinator/decentralized staff or enforcement division) is working better. However, both
Executive Summary
1

-------
Management Review Innovative Regional Structures
December 13 1996
options have demonstrated strengths and several implementation tools are worthy of special
note
•	Reorganizing for enforcement has had a significant impact on organization and delivery of
legal counseling services in the Regions There is no consensus as to which model works
better
REINVENTION PRIORITIES
•	Though all made efforts, none of the Regions reviewed was able to build strong
identification of a shared vision and values that drove the organizational change or explained
why it was necessary
•	Each of the five Regions mcreased customer focus on external partners and stakeholders,
such as States and Tnbes Reorganization disruptions, regardless of structure, caused short-
term, yet still-significant effects on customer service
•	There was little or no change in workforce diversity The hiring freeze and other budgetary
complications restricted the Regions' abilities to make changes in the workforce
demographics
•	To a significant extent, the five Regions eliminated the middle management layer
•	Tearns are viewed as the key to making many things work, yet establishing successful teams
has proven much harder than anticipated
•	Regions moved many staff and managers mto new jobs as they implemented their
reorganizations, resulting m significant disruptions Although there are early positive
indications, it is too soon to tell if the movement will yield the anticipated payoff in cross-
training, cross-fertilization and overall facilitation of new ways of thinking and operating
•	Regions reviewed met the mandate to reach the 1 11 supervisor to employee ratio There is
widespread dissatisfaction among staff and managers with the effect of going to 1 11
People are not seeing the changes in management roles and behavior, empowerment or
administrative requirements that were anticipated
•	Though flourishing in pockets, empowerment has not taken hold as a result of the
reorganizations
•	Not enough time has elapsed to tell if management roles and behaviors are significantly
changing Agency culture still fuels expectations that managers will be program experts
rather than coaches, mentors and facilitators
Executive Summary
2

-------
Management Review Innovative Regional Structures
December 13 1996
ACCOUNTABILITY AND INTEGRITY
•	The budget, finance, contracts and grants operations of the Regions were not significantly
impacted by the reorganizations
•	Reconciling the ever-increasing emphasis on multi-media work with the Agency's media-
specific budget structure is a continuing challenge for the Regions and the Headquarters
program offices
•	There is no question that there were short-term downturns in productivity due to
implementation of the reorganizations — as well as the FY 1996 Government shutdowns,
EPA's potential 34% budget reduction and RIF situation However, it is too soon to tell
whether the reorganizations have had a lasting affect on program efficiency, effectiveness
and accountability
PROCESSES FOR REORGANIZING
•	Defimng and clearly communicating the reorganization decision-making process makes a
difference m employee acceptance of the ultimate outcome Some Regions did this well,
others less well
•	All Regions used "design" teams in helping senior management with reorganization
planning The success of these teams was influenced by varying degrees of participation and
empowerment, and the team's relationship with senior management
•	Regions made significant efforts to reach out to external stakeholders and partners Less
attention was paid to reaching out to internal stakeholders in the Headquarters Offices
•	All Regions used some form of external organizational change consulting and most agreed
they would recommend it to others
•	All Regions underestimated the productivity downtime and the emotional reaction
accompanying major changes
OTHER ISSUES
•	Some Headquarters officials believe the SLC did not make tough choices about how to
organize the Agency as a whole, before allowing individual offices to reorganize
•	EPA's processes for designing, reviewing, and approvmg reorganization proposals are
flawed
•	Most of the five reviewed Regions underestimated infrastructure support costs (such as office
moves, phone changes, etc) associated with their reorganizations
Executive Summary
3

-------
Management Review: Innovative Regional Structures
December 13, 1996
•	Not only do Headquarters and State officials experience problems in communicating with
the reorganized Regions, so do other Regions.
•	The burden on managers from EPA' s cumbersome performance management system are felt
even more acutely now that the supervisor-to-staff ratio has widened to 1:11.
•	Some stakeholders in Headquarters, the States, and within the Regions themselves believe
that the positive changes made to improve the Regional delivery of programs could have
been achieved without reorganizing.
CONCLUSIONS AND RECOMMENDATIONS:
GENERAL: Overall, the Review Team concludes that Regions I, V, VII, VIII, and X have
implemented one or more significant changes from their traditional structures, and that more time
is needed before judging whether the reorganizations have been successful. Whether any of the
Regional reorganizations represents a model for the entire Agency should be carefully scrutinized,
but only after they have had a reasonable opportunity to demonstrate their advantages and
disadvantages.
Once the reorganizations have stabilized, and are ready for a more definitive analysis, a quantifiable
method to evaluate the changes the Regions made will be essential. We acknowledge that some of
the Agency's priorities are difficult to measure, either because they are qualitative, such as building
partnerships, or require years to implement fully and assess impact. The Review Team believes,
however, that a well-thought out evaluation process should provide data on the success of such
programs, as well as assess their weaknesses and recommend improvements.
INNOVATIONS HOLDING THE MOST PROMISE FOR THE FUTURE WORK OF EPA:
Because the Regional reorganizations have been in place only a short time, the Team does not
believe that enough time has elapsed to make a complete and fair assessment about what innovations
hold the most promise for other Agency offices. Nevertheless, the Team concludes that a number
of promising concepts and constructs implemented by the Regional Offices bear watching and
should be considered in future studies of the Regional reorganizations.
•	Region X's Definition of Core Processes: The Team was impressed that before
reorganizing, Region X examined the work it performs and identified seven core
processes around which to design its organizational structure. We found the Region
Office's overall approach to redesigning its organization to be logical and objective,
and are interested to see whether this organizational structure proves to be more
effective in achieving its intended results than those designed with less rigor.
•	Place-based Individuals. In its Organization, not only did Region X reaffirm the
need for its four State Operati°ns Offices (Alaska, Idaho, Oregon, and Washington),
but it physically placed more Regional staff in communities that need hands-on
assistance with their environmental protection efforts. The Region notes that
Executive Summary
4

-------
Management Review: Innovative Regional Structures
December 13, 1996
establishing these community-based offices is very expensive because of the
additional expenses for rent, furniture, equipment, and other infrastructure
necessities. However, the Team believes they may be worth the investment,
particularly given the limited amount of travel dollars and the large geographic
distances between the Regional Office and the states on the west coast.
•	Ecosystems Offices: Regions I, VIII, and X created central units to manage and
coordinate multi-media and geographic work, such as CBEP. Whether the rest of the
Region Office remained single media (Region X) or moved to a multi-media
structure (Regions I and VIII), establishment of these ecosystems offices has resulted
in dedicated resources to Agency priorities that may not have received much support
otherwise. If these offices live up to their potential, other Agency offices may want
to consider forming such an organization.
•	Regional Teams: Region V chose to keep its single-media structure in place, but
overlay a team structure to address strategic priorities, such as ecosystem protection
and pollution prevention. This team approach will require the Region Office to
become more adept at matrix management. If these teams live up to their potential,
they will serve as an alternative approach for those offices that want to pursue cross-
media work without a dramatic organizational change.
•	"Assignments, Not Positions" Concept: Region X, recognizing the reduced
opportunities for advancement into managerial positions, has developed a rotational
assignment concept. A key point of this concept is that managers do not "own" jobs
anymore, and that managers and staff rotate through a variety of experiences
throughout the years. The Team believes this is an intriguing concept that warrants
future evaluation to determine its applicability to the rest of EPA.
•	Resource Focusing: Region X hopes to try out its "resource focusing" effort during
FY 1997. Resource focusing attempts to answer questions such as determining
whether the Agency should take on specific projects, where to route them, and what
our role should be in these projects. In making such decisions, reliance will be
placed on such factors as risk analysis, resource considerations, and EPA's value-
added role. The Team believes this concept is promising and deserves watching to
see how it works.
LESSONS LEARNED: In addition to a number ofpromising concepts and constructs implemented
by the Regional Offices that bear watching, the Team concludes that there were a number of lessons
learned from the FY95 reorganizations that should be considered when planning and implementing
future Agency changes and reorganizations.
•	EPA State-based Offices: States reacted enthusiastically to the creation, or the
continuation, of focused, fully-authorized State-based offices. Region X maintained
good, comprehensive communications with the States by retaining their State
Operations Offices located in the State capitals. Region I located its State offices in
Executive Summary
5

-------
Management Review: Innovative Regional Structures
December 13, 1996
Boston, MA, but gave them full authority. In both cases, dedicated State offices
minimized the disruption to the States during the reorganization transition.
•	Enforcement and Compliance Assurance: There remains a high level of
inconsistency among the Regions, both in terms of how each balances enforcement
and compliance assurance efforts and the perceptions of Regional staff about what
levels of effort are appropriate. There are also grave concerns about how to integrate
and update data systems to allow tracking of multi-media and compliance assurance
activities.
•	1:11 Supervisor-to-staff Ratio: To achieve a Region-wide 1:11 ratio, most first-
level supervisors are managing more than 11 employees, in many cases 20-30, in
order to accommodate smaller immediate office staffs. The 1:11 ratio does not factor
in the non-Federal staff managed by supervisors, such as contract staff and Senior
Environmental Employees Program (SEEP) participants. EPA may not be well-
served by such a large span of control, given the technical nature of our work and the
need for program accountability.
•	Movement of Managers and Staff: In deciding to move many managers and staff
to new positions and programs, the Regions were not simply trying to reduce the
number of managers to reach the 1:11 supervisor-to-staff ratio. They also were
trying to foster cross-program knowledge and better support multi-media activities.
This movement of managers and staff was disruptive to program delivery and
customer service, partially due to the budget uncertainty of FY 1995.
•	Management Roles and Behaviors: EPA's avowed new role for managers and
supervisors is one of primarily coaching, mentoring, and empowering staff to handle
technical issues and resolve problems. While this approach is appealing, the Team
heard frustration from managers and staff regarding its practicality at EPA. Given
the variety and public nature of the issues EPA deals with, managers are expected by
internal and external stakeholders to attend to the resolution of environmental issues.
Therefore, they are finding it difficult to focus solely on coaching and mentoring
responsibilities.
•	Different HQ and Regional Perspectives and Priorities: Differences still exist
between Headquarters and Regional Offices related to Regional desire and need for
autonomy and flexibility in responding to local environmental needs, and
Headquarters' desire and need for the Regions to be held accountable for resources
and national environmental program delivery. These differences likely were
exacerbated during the FY 1995 reorganizations of both Headquarters and Regional
Offices.
•	Designing) Reviewing and Approving Reorganization Proposals. Several
Headquarters officials believe they were not adequately involved during the design
of the ne^ Regional structures. A number of Headquarters managers and staff also
Executive Summary
6

-------
Management Review: Innovative Regional Structures
December 13, 1996
commented that the procedure for reviewing and approving reorganization proposals
is flawed and should be revised.
OTHER ADVICE AND COMMENTS: The following comments did not fit easily into the
Innovations and Lessons Learned sections of this report, but are still worth noting.
•	Planning, Budgeting, and Accountability Functions. Regions I and V split up
their planning and resource management functions in their reorganizations, while
Regions VII, VIII, and X kept these functions together. The Tearn urges the soon-to-
be formed OCFO and Regions, regardless of structure, to watch these functions
carefully during the next 18 months to ensure that integration of the functions occurs.
•	Target EPA Efforts and Resources Better. Several Regional employees and
external stakeholders believe EPA has too many initiatives. They believe EPA
would be better off if it focused its efforts on three or four areas, rather than trying
to do something everywhere. Some Regional employees and State and industry
stakeholders suggested that EPA needs to target its efforts and resources better
toward areas where it can add the most value, and disinvest from those activities that
are not highly value-added.
RECOMMENDATIONS:
RECOMMENDATION
SUGGESTED LEAD
SUGGESTED
COMPLETION DATE
1. Give the Regions More Time: Senior Leadership
Council should announce to the Agency it is allowing the
Regional reorganizations an additional 18 months
(January 1997 - June 1998) of operational experience in
order to determine whether or not they produce longer-
term benefits in delivering public health and
environmental protection.
Senior Leadership
Council
January 1997
2. Develop a Systematic Method to Evaluate
Reorganizations: During 18-month period that the
Regions are gaining additional operational experience,
OARM should convene an Agency-wide workgroup to
develop a process for assessing the success of
reorganizations that includes both quantifiable and
qualitative data. The final evaluation process should
have Agency-wide consensus.
OARM
June 1998
3. Conduct an Analogous Preliminary Assessment of
Headquarters Office Reorganizations. OARM should
lead a review of the reorganizations which took place in
Headquarters during FY 1995, similar to this Innovative
Regional Structures Review, to identify lessons learned
about what works and what does not.
OARM
July 31,1997
Executive Summary
7

-------
Management Review: Innovative Regional Structures
December 13, 1996
RECOMMENDATION
SUGGESTED LEAD
SUGGESTED
COMPLETION DATE
4. Conduct a Follow-up Evaluation to this Review and
the Headquarters Review at the End of the 18
Months. In June 1998, OARM initiate/lead a follow-up
evaluation both to this Review and the HQ review
suggested in Recommendation 3 above, using the
systematic evaluation process (see Recommendation 2
above) agreed to by the Agency. The follow-up study
should have an Agency-wide perspective and include all
Headquarters and Regional Offices.
OARM
December 31, 1998
5. Assess Differences in Balancing Enforcement and
Compliance Assurance: OECA should analyze the
differences among the Regions in their balancing of
enforcement and compliance assurance activities and
continue its efforts to communicate the relative priority
and appropriate use of all enforcement and compliance
assurance tools.
OECA
June 31,1997
6. Improve Tracking Systems: OECA in concert with the
OCFO should lead an Agency-wide effort to improve
systems for tracking and crediting multi-media activities,
EJ efforts, compliance assurance activities, their related
environmental results, and sector-based approaches.
These systems need to start with clear definitions of
terms and break out of the media-specific focus on the
"legacy systems."
OECA
September 30, 2000
7. Study the Effect of the 1:11 Supervisor to Staff
Ratio: OARM should broadly assess the impact going to"
1:11 has had on EPA, considering how to either make
it more likely to work or provide more flexibility in its
application. This study should factor in non-Federal
staff managed by supervisors.
OARM
April 30,1997
8. Assess Cross-Media Expertise via Movement of
Managers and Staff: OARM should conduct a review of
cross-program experience within the ranks of EPA
management to determine to what extent tangible
benefits can be identified, and at what cost. Based on
the benefits and costs identified, the review should also
look at how frequent and to what extent the movement
of managers from program to program should be
encouraged within the Agency. This assessment should
factor in Region X's "Assignment, Not Positions"
concept for rotating managers and staff every few year.
OARM
December 31,1997
9. Find the Right Balance in Redefining Management
Roles and Behaviors: OARM should expand on the
management behavior guidelines in EPA's Reinvention
Guidance to address finding the right balance between
coaching/mentoring and more technical roles.
OARM
April 30,1997
Executive Summary
8

-------
Management Review: Innovative Regional Structures	December 13, 1996
RECOMMENDATION
SUGGESTED LEAD
SUGGESTED
COMPLETION DATE
10. Support the TeamEPA Project. OARM should provide
necessary resources to implement the recommended
national program activities; assess the extent of matrix
management operations across EPA; and implement
necessary activities and training to build this capacity.
The Team also recommends that OARM quickly
implement PERFORM (the new performance
management system) at EPA.
OARM
April 30, 1997
11. Dedicate Resources and Strong Support for
Processes, Training and Structures Needed to Build
Regional Capacity in Working in Teams. This
includes developing local programs to implement
TeamEPA recommendations, clarifying and
distinguishing interrelated roles and expectations of
supervisors and team leaders, and building expertise to
assist teams in successfully achieving goals.
Regional
Administrators
September 30, 1997
12. Clarify Goals for Agency Initiatives; EPA senior
leaders should develop Agency-wide agreement on
goals/objectives for Community-Based Environmental
Protection, Pollution Prevention, Environmental Justice,
and other Agency initiatives, and define "measures of
success" for tracking progress. The SLC should
sponsor this exercise, and require the NPMs staffing the
initiatives to lead development of the goals/objectives
and success measures for their respective initiatives.
SLC (NPMs with lead
for these individual
initiatives would staff
the SLC)
Before FY98 round of
MOAs.
13. Annually Evaluate Regional Performance under the
MOA Process, and later EPA's Planning, Budget,
and Accountability System: If Regions are not
meeting their commitments, determine the causes and
whether there is connection between delivering on
commitments and their organizational structures.
Office of the Chief
Financial Officer
(Agency lead with
involvement from NPMs
and Regions)
December 30,
Annually.
14. Better Coordinate EPA's MOA Process; In
establishing EPA's planning, budgeting and
accountability system, OCFO should bring the different
NPMs' MOA process onto the same time schedule.
Office of the Chief
Financial Officer
June 30,1997
15. Assess Small Programs in the Regions: Using
performance measures, evaluate whether small
programs — such as pesticides, toxics, UST, oil spills —
have lost program effectiveness and/or efficiency as a
result of the Regional reorganizations.
OPPTS/OSWER/OAR
June 30,1997.
16. Strengthen EPA's Clearance Process for
Reorganizations: OARM, in consultation with
Headquarters and Regional managers and staff, assess
the effectiveness of EPA's processes and procedures
for designing, reviewing, and approving reorganization
processes.
OARM
June 30,1997
Executive Summary
9

-------
Management Review: Innovative Regional Structures
December 13, 1996
ExeciJtive Summary
10

-------
Management Review: Innovative Regional Structures
December 13, 1996
INTRODUCTION
BACKGROUND AND CONTEXT OF THE REVIEW:
CLIMATE FOR CHANGE: During the past three years, the U.S. Environmental Protection
Agency (EPA) has undertaken cultural, programmatic, regulatory, organizational and structural
reinvention. Spurred in large part by Vice President A1 Gore's 1993 National Performance Review
(NPR), EPA set out to change the way the Agency works.
In June 1994, EPA Administrator Carol M. Browner reviewed the Final Report of the Regional
Enforcement Impacts Task Force and made a decision on how the Regions should reorganize their
enforcement and compliance assurance functions to ensure effective interaction with Headquarters
and effective cross-program coordination within the Region. She announced that the Agency's
Regional Offices had to implement, at a minimum, Option 2 of the Task Force's Final Report:
Creation of an Enforcement and Compliance Assurance Coordination Office and distinct
enforcement and compliance assurance units within the current regulatory media program division
to house all divisional enforcement and compliance assurance functions. The divisions themselves
would maintain all of their current media program responsibilities, including enforcement and
compliance assurance, and the Deputy Regional Administrator would remain the principal
accountable official.
Any Region could go beyond Option 2 to create a consolidated Enforcement and Compliance
Assurance Division, also known as Option 3. In keeping with the recommendation of the Task
Force, if a Regional Office elected to implement Option 3, the Superfund program was to be kept
separate from the Enforcement and Compliance Assurance Division; the Regions would have the
flexibility to determine whether inspection resources should be housed in the Enforcement and
Compliance Assurance Division, the Environmental Services Division, or both. The Administrator
allowed Regions to fold legal enforcement resources into the Enforcement and Compliance
Assurance Division, if in a given Region, a Regional Administrator, the Assistant Administrator for
Enforcement and Compliance Assurance, and the General Counsel agreed that the program's best
interest would be served by folding legal resources into that Division.
Not long after making her decision on Regional enforcement structures, Administrator Browner
issued two primary guidance documents. The guidance was designed to move the Agency away
from the traditional ways of thinking and operating, and toward ecosystem, sector-based, and cross-
media approaches with greater focus on customers and employee empowerment:
• EPA's FY 1995-99 Strategic Plan: In July 1994, the Administrator issued The New
Generation of Environmental Protection. The Plan's goals and guiding principles
center around working more effectively and innovatively with our partners (Federal,
State, local, Tribal, industry, and environmental) to anticipate and prevent pollution,
to ensure equal environmental protection for everyone, and to become a well-
Introduction
11

-------
Management Review: Innovative Regional Structures
December 13. 1996
managed Agency with efficient and effective programs. The Plan is intended to be
"a blueprint for change at EPA" that guides the Agency's planning, resource
allocation, and decision-making processes from FY 1995-1999.
• Reinvention Guidance: In August 1994, Administrator Browner announced her
decision to accelerate organizational and management change at EPA. To assist
Agency managers in this accelerated process, she issued Reinventing EPA —¦ Stpps
Toward a Stronger Workforce in September 1994. This reinvention guidance lays out
the Administrator's reinvention goals — shared vision/values, customer focus,
diversity, working collaboratively, and redesigned organizations (including
organizational attributes) — and a framework for organizational, management, and
cultural change.
In the reinvention guidance, the Administrator directed Assistant and Regional
Administrators to prepare Reinvention Implementation Plans by March 31,1995, and
implement those plans by September 30, 1996. These plans were to lay out how
each Headquarters and Regional Office would pursue the Agency's reinvention
goals. In a November 1994' revision to EPA's reinvention guidance, the
Administrator directed Assistant and Regional Administrators (AAs/RAs) to assess
how well their organizational structures fostered their ability to meet EPA's
reinvention goals and determine whether a reorganization was needed. Most
AAs/RAs did determine that they needed to reorganize their offices in order to meet
EPA's reinvention goals.
As EPA offices were planning and implementing reinvention and reorganization activities to meet
the spirit and intent of the Regional Enforcement Impacts Task Force report, the Strategic Plan, and
reinvention guidance, the National Academy of Public Administration (NAPA) released the results
of a study requested by Congress on EPA's resource allocation and priority-setting. This report,
Setting Priorities. Getting Results, was issued in April 1995 and contained themes consistent with
those of EPA, such as enhancing Federal/State partnerships, building State capacity, and exploring
alternatives to media-specific environmental protection.
FY 1995 REORGANIZATIONS: In August 1995, because of a potential 34% cut in EPA's FY
1996 budget, Deputy Administrator Fred Hansen decided to "freeze" the Agency's organizational
structure in anticipation of a Reduction-in-Force(RIF). He announced that those offices which had
submitted reorganization proposals which could be folly implemented by Fiscal Year-end
(September 30, 1995) were allowed to proceed with their reorganizations and any associated
reassignments. However, those offices with proposals that could not be implemented before
September 30 were not allowed to proceed with their reorganizations.
As a result, as of October 1, 1995, the following EPA Regional Offices had reorganized: Regions
I, III, V, VI, VII, VIII, and X. The following Regional Offices had not completed reorganizations:
Region II (.Received approval but delayed implementation)-, Region IV {Received approval but
delayed implementation)-, and Region IX.
Introduction
12

-------
Management Review: Innovative Regional Structures
December 13, 1996
In the spring of 1996, the Deputy Administrator Hansen lifted the freeze on reorganizations and
reassignments when it became apparent that EPA would not receive a severe budget cut. Regions
II and IV then implemented their reorganization proposals which had been approved in September
1995.
Of all the reorganization proposals submitted in FY95, the Regional proposals received the most
scrutiny by Agency managers and staff for two reasons:
•	Regions I and VIII Innovative— and Controversial— Proposals: Regions I and
VIII both designed their new organizations around the goals and guiding principles
outlined in the Agency's Strategic Plan. The NAPA report specifically noted that the
reorganizations proposed by Regions I and VIII, "if implemented successfully, could
work in tandem with efforts to change the oversight relationships with States.
Redirecting the energies of Regional staff toward cross-cutting issues would help
break down the narrow media focus and encourage more innovative approaches to
achieving environmental results." These proposals retained very little of EPA's
traditional structure wherein both Headquarters and the Regions have a single media
organizational structure. Not surprisingly, the proposals aggravated tensions between
Headquarters and the Regions related to Regional desire and need for autonomy and
flexibility in responding to local, environmental needs, and Headquarters' desire and
need for the Regions to be held accountable for resources and national environmental
program delivery.
•	HQ Concerns About National Program Delivery: TheNationalProgramManagers
were concerned about the impact the Regional reorganizations would have on the
Regions' ability to deliver national program priorities, such as implementing
statutory requirements. Many Headquarters managers and staff believed that Agency
offices could and should pursue strategic and reinvention priorities without changing
organizational structures, given the dynamic nature of priorities at EPA. Moreover,
they were concerned that Regional organizational structures which do not mirror the
Headquarters media-based structure would make it more difficult for Headquarters
both to hold the Regions accountable for achieving national environmental goals and
priorities, and to track resources for media programs, both dollars and Full-Time
Equivalents (FTEs).
On the other hand, the Regions believed that in order to be sensitive to State and
local community needs, they must have flexibility in how they organize to carry out
EPA's environmental programs. Regions I and VIII specifically believed that radical
change from single media organizational "stovepipes" is needed to truly advance
strategic and reinvention priorities, such as partnerships, customer service,
empowerment, and multi-media and cross-media environmental protection.
During the summer of 1995, the Administratorapproved the reorganization proposals submitted by
Regions I and VIII, as well as proposals from other Regions which retained the traditional single
media structure but added organizational units or Regional teams to foster strategic and reinvention
Introduction
13

-------
Management Review: Innovative Regional Structures
December 13, 1996
priorities. She had advised the Agency's Senior Leadership Council (SLC) — comprised of EPA
Assistant and Regional Administrators, their deputies, the Inspector General and General Counsel,
and their deputies — that she believed it was important to let the Regions experiment. She and the
SLC agreed, however, that approval of these proposals is not the end of the reorganization process;
Headquarters offices had raised important questions about whether multi-media structures can work
effectively in implementing national programs, and those questions should be pursued.
REQUEST FOR INNOVATIVE REGIONAL STRUCTURES REVIEW
On February 22, 1996, the Deputy Administrator asked the Acting Assistant Administrator for
Administration and Resources Management (AA/OARM) to commission a review of the FY95
Regional reorganizations. He stated that "...the review should examine all of the Regional
reorganizations, with a particular focus on those which broke with our traditional media-based
structure, such as Regions I and VIII." In his request to the AA/OARM, the Deputy Administrator
acknowledged that "...these reorganizations have only recently been set in place..." and that the
Review Team's observations and conclusions would be preliminary. He added that this review will
set the background for a more in-depth analysis in a subsequent Fiscal Year to allow offices that
reorganized enough time to stabilize under their new structures and to begin to collect data from
measurement and evaluation systems.
PURPOSE AND OBJECTIVES: Per the Deputy Administrator's request, the purpose of the
Review was to conduct a preliminary assessment of the Regional reorganizations implemented in
FY 1995 to:
•	Identify the lessons we have already learned about what works, what does not.
•	Note what changes hold the most promise for the future work of the Agency.
•	Recommend what steps we might take to continue these innovations in other parts
of EPA.
The Review Team's primary objectives included assessing how well the new organizational
structures have enabled the Regional offices to:
•	Pursue or achieve EPA's strategic and reinvention goals;
•	Establish and/or use Regional systems for measurement and evaluation outlined in
their reorganization proposals and reinvention plans;
•	Pursue or achieve NAPA recommendations related to enhancing Federal/State
partnerships, building State capacity, and exploring alternatives to media-specific
environmental protection;
Introduction
14

-------
Management Review: Innovative Regional Structures
December 13, 1996
•	Maintain or improve the integrity of resources management (contracts, grants,
cooperative agreement, and financial management; budget formulation/execution);
and
•	Maintain or improve the integrity of program management.
To achieve these objectives, some of which overlap, the Review Team organized its work around
three areas of study:
Strategic Priorities: This area focused on how well the Regional reorganizations have positioned
the Offices to carry out the broad, highest-priority areas/themes/goals/guiding principles, outlined
in the Agency' s FY95-99 Strategic Plan, for the current and future work of the Agency. The specific
strategic priorities the Team looked for in each Region included:
•	Community-Based Environmental Protection
•	Pollution Prevention
•	Partnerships
•	Enforcement, Compliance, Counseling, and, to a limited degree, Environmental
Justice
Reinvention Priorities: This area focused on how well the Regional reorganizations have
positioned the Offices to comply with EPA's reinvention guidance for new ways of operating and
to achieve the Agency's reinvention goals:
•	Shared Vision and Values
•	Customer Focus
•	Diversity
•	Working Collaboratively
•	Streamlined and Strengthened Organizational Designs
Accountability and Integrity: This area focused on whether the Regional reorganizations have
positioned the Offices to establish appropriate organizational structures, policies, and procedures to
provide reasonable assurance that the goals/objectives of Agency senior leaders are carried out
effectively, efficiently, and in compliance with applicable laws, regulations, and central agency
guidance. The specific priorities the Team looked for in each Region included:
•	Resource and Management Integrity
•	Program Accountability
In addition, the Team looked at the processes the Regions used to design, implement, and evaluate
their new organizational structures, and the processes the Regions used to move managers and staff
into new positions and/or new organizations resulting from the reorganization.
REVIEW PERIOD: March-November 1996
Introduction
15

-------
Management Review: Innovative Regional Structures
December 13. 1998
SCOPE: The scope of the review originally included all seven Regional reorganizations
implemented during FY95. However, in order to reduce the travel costs and minimize the travel
time required of the members of the Review Team, the Office of the Administrator and OARM
agreed to cut the number of Regions targeted for site visits to a sample of four.
In selecting the four Regions for site visits, the Review Team focused on those with innovative
structures: Regions I, VII, VIII, and X. The Team later added Region V to ensure that a large
Region — and the unique concerns that a large Region may have — was included in the sample.
The Tearn did not include Region II, IV, and IX in the sample because they did not reorganize during
FY95. Regions III and VI were the only two Regions which reorganized in FY95 that the Team did
not visit.
Of these five Regions selected for site visits, Regions I and VIII had the most innovative structures,
meaning they had moved away from the traditional media-based structures; Regions VII and X
maintained their media-specific offices, and supplemented them with multi-media offices to address
Agency strategic priorities; and Region V maintained its media-based structure and overlaid a
Regional cross-media and geographic team structure.
METHODOLOGY: The Review Team's study process involved the following four steps:
Background Review: The Team reviewed the programmatic, organizational, cultural, and
management goals and guidelines in the Administrator's reinvention guidance and the Agency
Strategic Plan; the reinvention plans and reorganization proposals submitted by the Regions during
FY 1995; Agency comments on the reorganization proposals; and the decision memoranda signed
by the Administratorapproving the Regional reorganizations. The Team also identified overarching
themes from the NAPA study.
Data Collection: The Team visited a sample of five Regions to collect data. Regional Team
members arranged a series of interviews with selected internal and external customers and
stakeholders of the Regions — including State, local, Tribal, industry, and environmental group
representatives — selected Regional managers and employees, and Headquarters managers and staff.
The Team gathered information on Regional communications, work flow, training or transitional
assistance, and where available, examined systems for measurement and evaluation, metrics, and
results measured to date.
Analysis: After conducting Regional site visits, the Team identified common and Region-specific
accomplishments, promising developments and early results, issues for resolution, and lessons
learned. From this analysis, the Team developed recommendations and next steps for the Deputy
Administrator's consideration.
Documentation and Reporting: Finally, the Team documented its observations and
recommendations in writing. This report serves as the written summary for the Innovative Regional
Structures Review.
Introduction
16

-------
Management Review: Innovative Regional Structures
December 13, 1996
CHAPTER 1
ANALYSES AND OVERARCHING OBSERVATIONS
STRATEGIC PRIORITIES
DESCRIPTION: This area focuses on how well the Regional reorganizations have
positioned the Offices to carry out the broad, highest-priorityareas/themes/goals/guiding
principles, outlined in the Agency's FY95-99 Strategic Plan, for the current andfuture
work of the Agency.
ABSTRACT:
•	Community Based Environmental Protection has found a home in each Region,
through specific structures (Regions I, VIII, X) and team approaches Organizing
around CBEP may hold some advantages in promoting resource commitment to
this priority.
•	Reorganizations generally consolidated Po 1 lution Prevention activities, providing
a home, visibility, focus and, in some cases, increased resources.
•	Organizations with dedicated State and Tribal offices or units were perceived by
States and Tribes as being more committed to building partnerships.
•	It is too early to tell which of the two enforcement reorganization options (i.e.,
central coordinator/decentralizedstaff or enforcement division) is working better.
However, both options have demonstrated strengths and several implementation
tools are worthy of special note.
•	Reorganizing for enforcement has had a significant impact on organization and
delivery of legal counseling services in the Regions. There is no consensus as to
which model works better.
Chapter 1, Analyses and Overarching Observations: Strategic Priorities
17

-------
Management Review: Innovative Regional Structures
December 13, 1996
COMMUNITY-BASED ENVIRONMENTAL PROTECTION (CBEP):
Regardless of organizational structure, this review confirms that CBEP has found a home and is
receiving attention in the five Regions. Countless projects, with scopes ranging from small sites to
multi-State ecosystems, are underway. This focus on CBEP is creating numerous opportunities for
partnerships with States, Local governments and communities. It is greatly improving Agency staff
experience in doing multi-media work. The Team found that CBEP projects are facilitating
significantly greater cooperation between EPA and other Federal agencies.
The Regions reviewed have taken varied approaches to CBEP. Regions I, VIII and X have created
major units or offices with a primary focus on place-based or ecosystem approaches. In Region I,
the Office of Ecosystem Protection encompasses the Air, Water, RCRA, Pesticides and Toxics
programs and has State units as an organizing approach to focusing on places and ecosystems.
Region VIII created an Ecosystems Protection and Remediation Office, with an Ecosystem
Protection Program subcomponent with multi-media staff and many teams. Region X created an
Office of Ecosystems and Communities to create and effect a strategy to identify, develop and
support ecosystem, geographic and place-based projects. Region V has taken a Regional team
approach to CBEP, with team leaders, reporting directly to the senior management team, and team
staff drawn from media program units. Region VII features a core ecosystem unit housed in the
Water, Wetlands and Pesticides Division and project teams drawn from across media-based offices.
Although it is too early to confirm with hard data, it seems likely that organizing around CBEP may
have some advantages in advancing this Agency priority. First is providing resources. Staff
working on cross-cutting initiatives are frequently serving multiple "bosses" and often feel the
strongest pull in the direction of their "regular job." Organizing people specifically into place or
ecosystem based units is more likely to align their primary pull with CBEP priorities. The Team
notes that both Regions I and VIII were unique in reporting that they had achieved the goal of having
20% of their resources working on CBEP. But some Regions are struggling to get commitment of
needed resources.
A second potential advantage is in signaling priorities. Having place or ecosystem-based offices
gives a clear signal about the priority of CBEP. At the same time, individual, cross-media CBEP
teams with strong senior management sponsorship, high visibility and dedicated resources
communicate a clear signal as well.
Third is in the area of integration. It may be that integration of CBEP approaches into the every day
work of more staff is easier to accomplish when it has a clear home base, rather than when it is
overlaid on traditional media approaches. It is also possible that CBEP planning is more thorough
when it is the basic work of an organization.
These potential advantages raise broader questions about the long-term role of CBEP at EPA. Is it
a tool, technique or approach to be used when deemed appropriate, or should it become a cardinal
approach to delivering environmental protection in the field? The fragmentation of CBEP at
Headquarters and the different approaches taken by the Regions seem symptomatic of the Agency' s
Chapter 1, Analyses and Overarching Observations: Strategic Priorities
18

-------
Management Review: Innovative Regional Structures
December 13, 1996
struggle to implement and evaluate CBEP. It may simply be too early in its evolution to decide how
central CBEP should be to our future.
The Regions are encountering some challenges in implementing CBEP, regardless of structural
approach. It will take larger Regional travel budgets, particularly in the West, to have the kind of
on-site presence that the Regions think is needed for CBEP work. Region X has assigned some
individuals to place-specific duty stations, with apparent success, but at significant cost. There is
also a need for access to more "seed money" for these projects. The Regions believe that more
dedicated funding or flexibility in use of current program funds should be considered. While CBEP
projects provide terrific partnership opportunities, Regions are experiencing a need to ensure that
States are in the loop at all the appropriate times to ensure State cooperation and avoid "turf' issues.
Some Regional staff also expressed concern about the drain on traditional program resources to
establish CBEP or other cross-media offices.
The Team noted a wide variety across the Regions in how CBEP is fitting in with Superfund. In
Region VIII, the CBEP organization is in the same office with the Superfund Program; the whole
office sharing a place-based orientation. In Region X, the Community Relations and Outreach Unit,
in the Office of Ecosystems and Communities, is working with all Regional programs to enhance
public involvement and use the Region's Superfund community relations program to develop new
public involvement strategies.
POLLUTION PREVENTION (P2):
All five Regions included in the review consolidated pollution prevention activities either in an
organizational unit and/or through the establishment of a P2 team. Regions I, VII, VIII and X
established P2 in an organizational unit. Region VII also established a team structure to assist the
unit. Only Region V addressed P2 through the establishment of a team only. The Region V
Pollution Prevention Team is headed by a full-time Regional Team Manager (RTM); the RTM
reports to the Senior Leadership Team (SLT) and has an SLT "sponsor." Region X's approach
differs somewhat from the other Regions that placed P2 in an organizational unit. Region X placed
P2 in its new Office for Innovation, which was designed to advocate for and support others in
exploring alternatives for improving environmental results and to identify opportunities to operate
more efficiently/effectively. The new office will tackle new Agency initiatives, like pollution
prevention, and "ready" them, as appropriate, for integration into the program offices. Region X
hopes that eventually P2 will wither as a separate program and be absorbed as an important
environmental tool by the various Regional media programs.
Overall, based on general perceptions, the consolidation of P2 activities in Regions I, V, VIII, and
X seems to be working, irrespective of the organizational structure. The reorganizations provided
P2 a home, visibility, focus, and in some cases increased resources in these four Regions. Industry
representatives and external stakeholders were very complimentary of Region I P2 activities and
believe the Region is moving in the right direction. Region V and X approaches appear to be
working and enabling the Regions to address pollution prevention. For instance, the Region V P2
Team appears to be sufficiently empowered and staffed with innovative people to be action-oriented
Chapter 1, Analyses and Overarching Observations: Strategic Priorities
19

-------
Management Review: Innovative Regional Structures
December 13, 1996
and creative. The P2 Team does policy coordination and is supported by senior management in its
efforts to encourage media offices to integrate P2 principles into their daily work. The head of the
P2 unit is also the P2 coordinator.
While the reorganization gave P2 a home, some Region VIII staff believe there is a duplication of
P2 efforts among the P2 Program, CBEP and the media programs. The Region is still sorting out
the P2 responsibilities. P2 staff feel that they are held accountable for the program where they do
not directly control it and must depend on the media programs for P2 results. Multiple program
offices are reporting on P2 activities and coordination with Headquarters and the States has initially
been more difficult. To help address this problem, OPPTS asked the Regional Office to identify a
single point of contact for them to work with and the Region has negotiated a P2 MO A with OPPTS
to help address the issue.
The Region VII Pollution Prevention Team is having difficulty obtaining broad Regional
involvement. A cross-Regional voluntary committee was set up to help coordinate P2 activities but
pollution prevention staff has seen little enthusiasm from Regional staff and managers. Committee
meetings are poorly attended. Some Region VII P2 staff think believe Regional placement of P2
(i.e., a voluntary team within a media office as opposed to the RA's office) may signal a lack of
Regional commitment to pollution prevention.
Headquarters OPPTS interviewees noted that consolidation of P2 efforts seems to work better than
fragmentation of P2 by media. OPPTS specifically recognized Region VIII's P2 program as
working well. OPPTS noted, however, that pollution prevention is a tool, but people do not know
exactly what it is or how to use it. They further noted that, with the exception of occasional small
"boutique" programs, the States are not really doing pollution prevention.
Overall, while there are some signs of success from some of the reorganizations, the Regional
Review Team believes it is too soon to tell which of the different Regional approaches to pollution
prevention will ultimately be the most successful. It will take more time to see if one organizational
structure is better than another and whether placement or senior management support plays a bigger
role in the success of pollution prevention. Success depends on the objective of the Pollution
Prevention Program/Initiative. A clear definition of success for pollution prevention needs to be
established before the reorganizations can be objectively evaluated.
PARTNERSHIPS:
COMMUNICATION DURING THE REORGANIZATIONPROCESS: The Senior Leadership
Council charged Agency offices with maintaining effective communication with external customers
and stakeholders during their reorganizations. The States and Tribes clearly indicated the five
Regions had made a serious effort to keep the States and Tribes informed about the progress of the
Regional reorganizations. The Regional Offices solicited comments from the States and Tribes, and
provided periodic updates as they implemented their reorganizations. According to the State and
Tribal officials, the Regions generally succeeded in their external communications related to the
Chapter 1, Analyses and Overarching Observations: Strategic Priorities
20

-------
Management Review: Innovative Regional Structures
December 13, 1996
reorganization. The officials were generally complimentary of the communication efforts, even
when they were doubtful about the success of the reorganizations themselves.
Many State officials indicated that they considered the reorganizations to be internal Regional
concerns and preferred not to offer comments. One State official was clear: he told the Region he
would not participate in its reorganizational process in order to avoid Regional interference in any
future reorganizationhe might make in his own department. Several other State officials mentioned
that they had offered suggestions but that those suggestions had not been used. They did not
complain that the Regions had not used their comments, but rather that if the comments were not
realistically going to be considered, they probably should not have been solicited.
Tribal officials were less concerned about the application of "reinvention" than they were to the
changes the Regions were undertaking that would affect their working relationships. These officials
stated that although they were kept informed, the Regions generally did not ask for their suggestions
or comments about the reorganizations.
STATE REACTIONS TO THE REGIONAL REORGANIZATIONS: Reorganizations that
involved significant management and staff shifts significantly disrupted the Regional Offices'
relationships with State partners. The more personnel shifts that were made, the more the disruption.
State officials were more resigned than angry, but emphasized that they had lost momentum in their
work due to losses in formerly well-known points of contact and institutional memory. The State
officials were frustrated by the lengthy downtime in Regional attention to routine business caused
by staff preoccupation with the potential effects of the changes on their own careers. Also, the
Regions' distraction from routine business was compounded by the threat of RIFs and by the
government shutdown that occurred during the first quarter of FY 1996. The physical moves in
some Regions exacerbated the disruption, with numerous phone numbers being changed, and
without updated phone directories to offset the resulting confiision.
The disruption to State working relationships was less in those Regions which had existing State
Liaison functions. This is not to say that they succeeded totally without complaint. However, States
which had a well-identified Regional program team to work with — including troubleshooting and
negotiating the new Performance Partnership program — attributed any absence of problems to the
State Liaison functions. The key to the success of the State Liaisons appears to be their well defined
roles and decision-making authority.
States especially appreciate the decisions of the two Regions with the strongest dedicated State
Offices to maintain or create those offices. The following two Regions were singled out by State
Officials as achieving a number of positive results, such as making the States' transition to the
Regions' new organizational structures easier:
• Region X: Region X established State Operations Offices in the State capitols
during the creation of the Region. When planning the reorganization, the Region
decided to maintain these offices. However, the staff in these offices now report
directly to the Director of each program office in Seattle. Formerly, the staff in each
Chapter 1, Analyses and Overarching Observations: Strategic Priorities
21

-------
Management Review: Innovative Regional Structures
December 13, 1996
State Operations Office reported to a Director of that office. One State official said
this has resulted in faster responses than when the State Operations staffer had to
work out problems internally before discussing them with Seattle.
The benefit of maintaining the State Operations Offices was clearly stated: EPA has
had much more visibility within the States because of the permanent presence of staff
in the capitals. EPA can better appreciate the views of its State partners, given the
enhanced ability to communicate. Also, EPA also can coordinate better with other
Federal agencies which also have offices in the capitals.
Region X expanded its network of State Operations Offices beyond the State
Capitols to locations such as Yakima and Spokane, Washington, and LaGrande,
Oregon, with the intention of building a place-based function in addition to their
well-established State operations.
It should be noted that the State officials are not necessarily pleased with the
Regional staff expanding beyond the State Operations Offices. The Review Team
heard concerns that as Region works more intensely with local governments, it is at
the expense of consultations with its State partners on community based projects.
The Region X State Operations and place-based staffs talked at some length about
the effects of limited travel money. Their concern was reiterated by a State official
who finds coordination difficult between the two Region X offices in his State.
Without flexibility to travel in the Western States, particularly those with wide
geographic distances and thinly spread populations, the Agency's ability to build
support for or to explain its complicated programs is significantly reduced.
• Region I: Region I's reorganization established State Units and Liaisons specifically
to improve delivery of their programs and services to the States. New England State
officials expressed a significant positive response to these Units and their
effectiveness. The State Officials in Region I were generally complimentary of the
State Units, both the people who head or staff them and the degree to which they are
empowered to address problems raised by the States. They appreciate having a clear
point of contact.
Region V did not reorganize specifically around their States. Region V's State Coordinators pre-date
the reorganization. However, the reorganization altered the Coordinators' responsibilities from an
active role in the Region's relationship with the States to becoming one member of a larger team
working with the States. Officials from four States were unenthusiastic when queried about the new
State Coordinators, stating their observations that the Coordinators are not yet providing much
difference in the level of service to the States. The Region's primary focus, in changing its delivery
of services to the States, is to concentrate more on Place-Based functions. The Region has
established an Outposting Regional Workgroup tasked with studying the feasibility of establishing
State (Liaison) Offices in the Midwestern States.
Chapter 1, Analyses and Overarching Observations: Strategic Priorities

-------
Management Review: Innovative Regional Structures
December 13, 1996
The multi-media structures of Regions I and VIII are making the negotiation and implementation
of the Performance Partnerships easier. Region VIII has a State Assistance Office reporting to a
multi-media division with State Program Managers for each of its six States. The Region I State
officials indicated their States traditionally had good relationships with the Region, but gave the
Boston office very high marks for its progress with the negotiations for performance partnership
agreements and grants (PPA/PPGs). With only one exception, all of the Region I State officials were
clear that the creation of the State Liaisons was the overriding reason that the Performance
Partnership negotiations are going so smoothly. The exception was the State official who sensed
Regional staff resistance to incorporating the full flexibility into the PPA/PPGs as he thought had
been promised.
Region V, which maintained its traditional media structure, set up a separate National Environmental
Performance Partnerships (NEPPS) team consisting of representatives from each program, to
negotiate between each of the States and the programs. The State officials indicated a cautious sense
of the progress of the Performance Partnerships in the Region. The Region V States are proceeding
with negotiations for all or part of the agreements and grants. Most talked about their sense of
Regional staff resistance to the program, and their overall sense of the Region's struggle to
implement the Partnerships. For example, one State official described the Regional staff as unable
to answer the State's questions on programmatic trade-offs, which he interpreted as a conflict with
the promise EPA made to change doing business as usual. A couple of the State officials discussed
their perception of Region V staff resistance to the program, and stressed the need for more Agency
training to implement the program properly.
State officials' perception of staff resistance was heard in several of the Regions. One official
indicated that he sees a good deal of support at the program manager level for Performance
Partnerships, but that it falls apart at the staff level with their placing the blame on their fear of being
"nailed" by the Inspector General for incorporating insufficient specificity. He suggested that the
staff seems generally uncomfortable with the new ways of doing business, and may be using the IG
as a scapegoat. One other participant conceded that he has noticed the same reluctance in his own
staff. This suggests that both Regional and State staffs are still feeling their way toward working
comfortably with a new and complicated program. Nonetheless, this issue appears to be an
important source of frustration for the States in observing EPA's initial steps in a program for which
they have waited with a great deal of optimism.
One State staff member echoed the concern of some EPA Headquarters staff over the breakup of
small programs. In this case, the State official referred to the breakup of the FIFRA program. This
comment was notable in that it confirmed comments Headquarters officials said had been made to
them by the States about how Regional reorganizations have affected the Region's ability to deliver
united and coherent services for small programs. The State official said the FIFRA program was
treated as a "poor stepchild" in both the Region and in Headquarters, and that the Region had taken
a well-operating program and totally dismantled it. The program which once featured "one-stop
shopping" now requires five or six separate calls to get a problem solved.
Chapter 1, Analyses and Overarching Observations: Strategic Priorities
23

-------
Management Review: Innovative Regional Structures
December 13, 1996
TRIBAL REACTIONS TO THE REGIONAL REORGANIZATIONS: Most of the Regions
increased their focus and visibility with Tribal programs.
Region X established a Tribal Program with two co-managers working closely, on site, with
Regional Tribal Coordinators. The co-managers report directly to the Regional Administrator. The
Tribes see this direct reporting relationship as an important boost in prestige. However, they are
watching to see how "bugs", such as the office's capacity to coordinate Tribal needs more effectively
with the program offices, are handled.
Region V has had a solid relationship with its Tribes for some time. They were complimented by
a Tribal leader for the effort that was made to consult with the Tribe during the reorganization
process. The Tribal leader indicated his appreciation for the Regional Administrator's commitment
to working on Tribal needs, as is evidenced by the Regional Tribal Liaisons that have been in place
for some time. The leader also said that from a Tribal point-of-view, the Regional recognition of
multi-media activities has been needed. The Tribes have always had to work on a multi-media basis
because of their inability to fund positions on an individual media basis.
ENFORCEMENT, COMPLIANCE, COUNSELING, AND ENVIRONMENTAL
JUSTICE:
REGIONAL ENFORCEMENT OPTIONS: In June 1994, the Administrator announced her
decisions about Regional reorganization of enforcement and compliance assurance activities and
related legal resources. First, Administrator Browner decided to allow Regional variation. She
recognized that each Region is unique, differing from all others in the nature of it relationships with
its States and in its size and its program characteristics. She also recognized that having different
Regional enforcement, compliance assurance, and legal structures would create some problems with
coordination and consistency. In part to limit those problems, she allowed only two basic
reorganizationoptions: create an Office of Enforcement Coordination or consolidate enforcement
activities. [Note: These two options were known as "Option 2" and "Option 3. There was not an
"Option 1" for the Regions to consider].
Enforcement Coordination Offices, known as "Option 2:" As one option, the Administrator
directed that each Region create an Enforcement and Compliance Assurance Coordinating Office
and structurally consolidate enforcement and compliance assurance functions within each existing
regulatory media program division. This option was identified as "Option 2" in the Final Report of
the Regional Enforcement Impacts Task Force. The coordinating office would report to the DRA
who would be ultimately accountable for the implementation of the enforcement and compliance
assurance programs. The media divisions would retain all of their existing media responsibilities
but would consolidate all of their divisional enforcement and compliance assurance functions into
single units. The Administrator accepted the coordination office option as the minimal
reorganization a Region could implement based on her conclusion that it would meet the
fundamental needs to ensure a) effective interaction with Headquarters and b) effective cross-
program coordination within each Region.
Chapter 1, Analyses and Overarching Observations: Strategic Priorities
24

-------
Management Review: Innovative Regional Structures
December 13, 1996
Enforcement Divisions, known as "Option 3:" The Administrator also offered, and encouraged,
another option for those Regions which decided they could go further. She authorized Regions to
create a consolidated Enforcement and Compliance Assurance Division, the Task Force's "Option
3." Under this option, the Regional Offices would structurally consolidate most programmatic
enforcement and compliance assurance functions into a single division. However, the Superfund
program was to be kept separate and the Regional Office would have flexibility in deciding whether
to place inspection resources in the new division, in an Environmental Services Division, or both.
The Administrator, recognizing the potential problems associated with separating legal resources,
nevertheless authorized the Regional Offices, in consultation with OECA and OGC, to move legal
enforcement resources into the consolidated divisions. The Administrator encouraged adoption of
the enforcement division option because of the support such a reorganization would give for the
promotion of integrated, cross-program approaches to environmental protection.
Of the five Regions the Review Team visited, three selected the coordination office option: Regions
V, VII, and X.
•	Region V: Region V considered, but rej ected, the consolidated enforcement division
option, mostly based on the Region's size and on input from its States favoring
media-based enforcement. Instead, Region V established an Office of Enforcement
and Compliance Assurance which has a small permanent staff and reports directly
to the DRA. The Office serves as the principal contact for enforcement matters with
Headquarters OECA and the States. Enforcement and compliance assurance
functions within each media division was usually, by not always, consolidated into
a single branch. Inspectors were moved into the media divisions from ESD. The
Office of Regional Counsel retained enforcement and counseling attorneys, but they
were reorganized on a multi-media basis. Perhaps the most significant aspect of
Region V's reorganization of enforcement and compliance assurance functions was
the creation of a well-supported, cross-divisional Enforcement and Compliance
Assurance Team, one of the 18 Region-wide teams. This team is headed by the
Enforcement Coordinator.
•	Region VII: Region VII also opted for the keeping enforcement capacity distributed
among the major program offices, leaving all the attorneys in the Office of Regional
Counsel, and creating an Enforcement Coordination Office. These decisions were
based on the small size of the Regional Office and the history of strong working
relationships within the Regional Office on enforcement matters. ORC reorganized
along multi-media lines, simultaneously improving its internal communications and
collegial management. The Regional Office maintained its Multi-Media
Enforcement Committee because of its prior effectiveness. Also of note, about 65%
of the field inspectors remain in ESD.
•	Region X: In selecting the coordination office option, the Region reaffirmed what
it essentially had in place already. "Ensuring Compliance with Environmental Laws"
was one of Region X's core processes identified prior to reorganizing, although
enforcement reorganization was not uniformly understood by Regional staff to be
Chapter 1, Analyses and Overarching Observations: Strategic Priorities
25

-------
Management Review: Innovative Regional Structures
December 13, 1996
one of the principal forces driving the Regional reorganization. Region X's Office
of Enforcement and Compliance Assurance has five employees to coordinate multi-
media and Federal facility enforcement, track enforcement activities, and negotiate
the Memorandum of Agreement (MOA) with Headquarters OECA. The Region's
media offices, with the exception of Air, have single consolidated enforcement
offices.
Two Regions, Regions I and VIII, chose the consolidated enforcement division option.
•	Region I: Region I consolidated most of the Region's enforcement and compliance
assistance resources in the new Office of Environmental Stewardship (OES). That
Office has an Enforcement Unit and an Assistance and Pollution Prevention Unit.
The Assistance and Pollution Prevention Unit is the largest organization of its type
in the country; the unit works to provide technical and regulatory assistance to both
industry and the public sector. OES has both attorneys and technical staff (although
the non-legal Superfund enforcement staff is in the Superfund Division). Non-
enforcement, counseling attorneys are now in the Office of Regional Counsel, and
therefore separated from the OES enforcement attorneys.
•	Region VIII: Enforcement reorganization was one of the principal drivers of the
structural changes in Region VIII. After deciding to consolidate enforcement and
compliance assistance resources, the Regional Office created a new Office of
Enforcement, Compliance, and Environmental Justice (ECEJ). Enforcement
attorneys were moved into ECEJ; counseling attorneys became part of a new Office
of Regional Counsel. ECEJ has a legal unit plus a Technical Enforcement Program.
That latter Program is organized by media, to promote communications with
Headquarters, but cross-media sector and State teams were created to support State
activities. Each case officer handles both compliance assurance and enforcement
responsibilities.
It is too soon to draw definitive conclusions about which of the two enforcement reorganization
options is working better. It will take many more months of experience with the various features
of the Regional enforcement reorganizations to fully evaluate them. However, the Review Team did
hear several comments worth noting.
•	Communications: Communications at the time of the planning of the
reorganizations were probably inadequate between the Regions and OECA, and
between OECA and other HQ offices.
•	Coordination: As a result of the Regions' selecting different enforcement
approaches, it is now more difficult for Headquarters offices, and in particular,
OECA and OGC, to coordinate effectively with the Regional Offices and for the
Regional Offices to coordinate among themselves on enforcement and counseling
matters.
Chapter 1 Analyses and Overarchina Observations: Strategic Priorities
26

-------
Management Review: Innovative Regional Structures
December 13, 1996
•	Multi-Media Enforcement: Regardless of the option selected, one Headquarters
office believes that multi-media enforcement efforts have improved. This suggests
that internal Regional coordination is better, and that efforts to break down media
barriers are showing results, under both available options.
•	Comments Related to Consolidated Enforcement Division Option (Option 3):
The Team heard several comments about how consolidation of enforcement and
compliance assurance functions should improve the consistency of enforcement
strategies across media programs. However, the comments seem to be more in the
nature of predictions without verified results. Similarly, there was no strong
evidence presented to support the general sense that those Regions with enforcement
divisions had the edge on promoting both enforcement and compliance assurance and
a slight lead on enforcement production; it still seems too soon to tell.
On the other hand, Headquarters offices expressed the concern, before the
reorganization, that separating enforcement staff from program staff might leave
small programs with less than critical mass, especially where the program was highly
technical. It was not clear from our discussions in the Regional Offices that this fear
was realized.
As noted above, the different Regional structures makes coordination with OECA
more difficult. However, from a Headquarters point of view, coordination seems
somewhat smoother now with Regions I and VIII (after initial, extensive disruption
of communications with Region VIII); there was speculation that this is true because
the Enforcement Coordinators may not have the same clout as the heads of the
enforcement divisions. Data collection, in particular, seems more difficult where
there is an ECO. From the Regional perspective, OECA seems not to have made all
the changes necessary to coordinate with the enforcement divisions. In particular,
we heard that OECA has not adjusted its reporting systems to fully track the progress
of multi-media efforts.
•	Comments Related to Coordination Office Option (Option 2): Several features
of this option deserve discussion, beginning with the enforcement coordinator's
offices and the cross-media enforcement teams. Notwithstanding the general sense
from Headquarters that coordination on enforcement matters is perhaps easier where
enforcement divisions exist, there was some evidence in Region V that the
establishment of enforcement coordinators still contributed to improved coordination
with Headquarters compared to what existed before the reorganization. The jury is
still out in Region VII about the benefits of creating an enforcement coordination
office.
For those Regions which picked the coordination office option, there seem to be at
least potential benefits from having a strong Region-wide team to manage or
coordinate enforcement. This was the maj<*rity sentiment in Regions V and VII,
both of which have well-resourced, active, engaged teams. In both cases, the
Chapter 1, Analyses and Overarching Observations: Strategic Priorities
27

-------
Management Review: Innovative Regional Structures
December 13. 1996
enforcement coordinator chairs the team, and the ECO staff supports the Team's
activities. The Multi-Media Enforcement Committee in Region VII was established
before the reorganization; it continues to be an effective group, acting as a board of
directors for enforcement policy, ensuring a fair measure of coordination even in the
absence of an enforcement division. It is harder to identify concrete
accomplishments of the new Regional Enforcement and Compliance Assurance
Team in Region V. However, the Regional Office expects the team to be successful
because the members represent a variety of Regional offices, they are typically
supervisors, and they are well-supported by the ECO staff.
The Review Team heard little about the impact of the decision where to place the
inspectors. Generally, in Region V, there was optimism that distributing the
inspectors to the media offices would make them more available to perform
inspections deemed necessary by the enforcement program. However, the Team
heard no negative reactions to the retention in ESD of most of the Region VII
inspectors.
COMPLIANCE ASSURANCE: The structuring of the compliance assurance function appears to
have a pronounced impact on how vigorously it is implemented, as evidenced by the comparison of
how Regions I, VII, and VIII addressed compliance assurance. In Region I, the Office of
Environmental Stewardship is divided into the Enforcement Unit and the Assistance and Pollution
Prevention Unit, the latter providing technical and regulatory assistance to industry and the public
sector. The Region's conscious effort to adjust the balance between enforcement and compliance
assurance was demonstrated by the creation of the separate unit. The staff of the unit, which is the
largest such Regional unit in EPA, works on compliance assurance activities full-time. The
organizational separation was designed, in part, to help build trust between EPA and the regulated
community. While that trust takes time to grow, it appeared to the Review Team that, partly as a
result of the restructuring and the efforts of the compliance assurance staff, industry has gotten the
message that Region I was trying to do business in a new way. The OES staff acknowledged that
they still need to be careful to coordinate enforcement and compliance assurance efforts, to improve
targeting.
In Region VII, the reorganization did not change the compliance assurance activities, although the
Regional Office is more focused on multi-media activities. The integration of the compliance tools
is time consuming and more difficult to measure. In Region VIII, each case officer in the Office of
Enforcement, Compliance, and Environmental Justice does both enforcement and compliance
assurance.
Topics which came up repeatedly in the Team's conversations about compliance assurance were
measurement systems and data integration. OECA generally finds information gathering adequate,
even with respect to getting information about compliance assurance and compliance rates by
industrial sectors. However, several Region X representatives complained that OECA's data
collection system remains too oriented t* media programs and fails to adequately measure
compliance assurance activities and the related environmental results. Region VIII staff, pointing
Chapter 1, Analyses and Overarching Observations: Strategic Priorities ~	~ "
28

-------
Management Review: Innovative Regional Structures
December 13, 1996
out that "you can only manage what you can measure," urged that the Headquarters systems be
modified to track multi-media, sector, and EJ activities, and better define the terms. This was an area
where the Regional Offices think that the Agency infrastructure clearly fails to support their needs.
Overall, problems with measurement systems and data integration limit the Agency's ability to tell
good stories about our work.
Representatives of several Regions complained that they had received mixed messages about the
relative priority of enforcement and compliance assurance. These messages, the Team was told,
came from the Administrator, OECA, and the senior leadership of the Regional Offices.
Considerable confusion still exists in most Regions, resulting, in the opinion of some, in inconsistent
approaches across the Regions on how to best balance enforcement and compliance assurance
efforts. This, in turn, results in confusion in the States and distrust in the regulated community.
This raises the question of whether the reorganizations produced lower enforcement numbers than
in previous years. Staff in all Regions the Team studied indicated there was reduced enforcement
in FY 1996. Few people pointed to the reorganizations as a significant contributing factor; rather,
the shut-downs, the mixed messages, and the other budgetary factors seem to conspire to drive down
production.
COUNSELING: As noted above, one of the features of the reorganization in Regions I and VIII,
the Regional Offices which consolidated their enforcement and compliance assistance functions, was
the organizational separation of the lawyers. In Regions I and VIII, the enforcement lawyers moved
into the Office of Environmental Stewardship and the Office of Enforcement, Compliance, and
Environmental Justice, respectively. The counseling attorneys went into reorganized Offices of
Regional Counsel. In Regions V, VII, and X, attorneys performing counseling activities remained
in consolidated Offices of Regional Counsel. In fact, most counseling attorneys are also
enforcement attorneys. [For purposes of this discussion, "counseling" is used to mean the activities
of the lawyers in the Regional Offices who provide advice to program clients about the media
programs and various general law areas such as grants, contracts, appropriations, information law,
employment law, cross-cutting statutes, property, and claims. The advice includes interpretations
of statutes and regulations; the assessment of legal risks; and counseling about defensive litigation
and related administrative adjudication. Such work is directly analogous to much of the work
performed by OGC.]
There was no consensus about which structure worked better, either among Regional or
Headquarters personnel. Generally, Regional attorneys preferred the structure their own Region
adopted. It is possible, however, to report on a number of observations the Review Team heard. In
Region VIII, some attorneys found that the separation of counseling and enforcement functions has
provided a clarification of roles for both the enforcement and the counseling attorneys, which the
Regional Office views as a positive thing for the program clients. There seemed to be general
satisfaction among the ORC staff with their counseling workload and their professional
opportunities.
Chapter 1, Analyses and Overarching Observations: Strategic Priorities
29

-------
Management Review: Innovative Regional Structures
December 13, 1996
In Region I, the attorneys in ORC noted that their organization now better reflects the split of
Headquarters lawyers between OGC and OECA. Like Region VIII's lawyers, the Region I ORC
attorneys saw some benefit in the separation because it tends to focus attention on the difference
between enforcement and counseling work. Superfund legal work seemed to be an exception: the
line between counseling and enforcement is more difficult to draw and the organizational separation
of the attorneys may have created more issues than it resolved. The attorneys perceive that their
program clients value having a central point of contact for counseling issues, where the counseling
work does not get pushed aside by higher priority enforcement legal work. In particular, the clients
appreciate having dedicated resources available to address general law issues. However, other ORC
attorneys expressed dissatisfaction with the separation of enforcement and counseling.
Some of the initial opposition to the Region I reorganization of lawyers was based on a concern that
the staff attorneys would have to limit their activity to just one specialty. To address this concern,
ORC and OES set up a program to permit "workload diversity," i.e., allowing attorneys to perform
both counseling and enforcement work and to perform legal services in a variety of media. While
a number of attorneys have welcomed the opportunity to have a diverse workload, Regional
managers acknowledge that the system is too complex. In particular, the Team heard complaints
about staff attorneys' having to report to two or even three different supervisors. This is causing
some confusion for the staff attorney, more work for the supervisors in managing a finely divided
workload, and objection from some clients, in particular the Superfund program. Some attorneys felt
pressured to work in multiple areas and feared losing the ability to become full experts in areas of
their greatest interest. Supervisors reportedly are having some difficulty in keeping track of their
staffs' work assignment. There are also issues about proper coordination in evaluating the work of
the staff.
The overall sense from the Regional Office was that there are important benefits, in particular with
respect to staff attorney morale, in allowing some degree of workload diversity. However, the
system needed to be simplified to avoid problems of over-complexity. Regional management
recognizes this need and plan to make some adjustments as part of its mid-course correction effort.
It is interesting to compare the experiences of the attorneys doing counseling work in Regions V,
VII, and X. Region V's ORC was reorganized into two multimedia subunits. The importance of
cross-media and multi-media capacity has been underscored by a new, random process for assigning
most work to staff attorneys, under which attorneys must work on enforcement in various media
areas and also are available to do counseling. Most attorney seem to like the diversity of their
workload and the opportunity to learn new areas. Their clients, however, sometimes complain about
the lack of continuity and the fact that assigned attorneys are often new to the media area.
In Region VII, as part of the internal reorganizationof the ORC, two new multi-media branches were
created and a system was established under which any attorney desiring assignments and cases in
different media areas, or in both counseling and enforcement, could get it. This experiment has been
successful, according to both managers and staff attorneys. Everyone who wanted the variety of
work has gotten it. Multi-media capacity has expanded, as a result, and the ORC gained flexibility.
These gains combined with the improved coordination and streamlined management of the ORC to
make the Office more effective and a more satisfying place to work. Some attorneys noted that their
Chapter 1, Analyses and Overarching Observations: Strategic Priorities
30

-------
Management Review: Innovative Regional Structures
December 13, 1996
effectiveness was enhanced by the opportunity to perform both counseling and enforcement; this
view was different from the general sense the Review Team got from Region VIII. It is interesting
to note, however, that while several attorneys in Region VII said there was no conflict in performing
both counseling and enforcement, they differed in how explicitly they notified their clients about
what role they are performing on each assignment. There was general agreement that staff and
managers in ORC rely heavily on subject matter experts to make the system work. As noted
elsewhere in this report, Region VII's expert system seems to be working better in ORC than other
parts of the Regional Office.
There is one final note about counseling. While most offices, if asked, would undoubtedly complain
about inadequate resources, the Review Team repeatedly heard specific comments, particularly in
Regions VIII and X, about the inadequacy of resources for the counseling function. In Region VIII,
this might have been due to the allocation process following the reorganization. The Team heard
the opinion expressed that stable and adequate counseling resources are particularly important at a
time of change, because of the continuity the counseling attorneys can provide. One Headquarters
representative noted that underfunding of counseling activities was a condition which predated the
reorganizations, but the structural changes did little to improve the situation.
ENVIRONMENTAL JUSTICE (EJ): The Review Team was able to gather very little information
about the placement of E J function and innovative approaches used to promote E J. The Tearn does
know that the Regional Offices wrestled with both issues. Region V created a Region-wide team
to address EJ activities. In Region VII, the placement decision was originally deferred. Ultimately,
it was placed in the Enforcement Coordination Office, partly because the ECO has good contact with
all the media offices. The goals of the placement were to underscore the importance of EJ and to
align their EJ structure with Headquarters. Region VIII set up a new organizational unit for EJ. In
Region X, EJ was placed in the Office for Innovation on the theory that the principles of EJ could
be more readily integrated into the major program offices.
OTHER OBSERVATIONS ABOUT STRATEGIC PRIORITIES:
Worth watching over the next few years are the varied approaches to nurturing and implementing
the Agency's strategic priorities taken by these Regions. Region VIII has explicitly structured its
organization around the guiding principles in the Agency's Strategic Plan. Though less explicitly
so, Region I's structure reflects the same approach. Region V has taken a matrix approach with
high profile, cross-cutting teams. The leaders of these teams are highly-graded and report directly
to senior management. Complimentingthese teams is an Office of Strategic Environmental Analysis
to help senior management analyze the forces acting on the Regions's environment and set the
strategic course for the organization. Taking yet a different tack, Region X has created separate
units, alongside but outside the traditional media units, to propel the strategic initiatives. The Office
for Innovation is meant to serve as the hot-house for new approaches and ideas, testing them out in
the Regional setting before transplanting them into the operations of the program divisions. Region
X has also established an Office of Ecosystems and Communities to act as a catalyst for CBEP
activities.
Chapter 1, Analyses and Overarching Observations: Strategic Priorities
31

-------
Management Review: Innovative Regional Structures
December 13, 1996
Chapter 1, Analyses and Overarching Observations: Strategic Priorities
32

-------
Management Review: Innovative Regional Structures
December 13, 1996
CHAPTER 2
ANALYSES AND OVERARCHING OBSERVATIONS
REINVENTION PRIORITIES
DESCRIPTION: This area focuses on how well the Regional reorganizations have
positioned the Offices to comply with EPA's reinvention guidance for new ways of
operating and to achieve the Agency's reinvention goals: Shared Vision and Values;
Customer Focus; Diversify; Working Collaboratively; and Streamlined and
Strengthened Organizational Design,
ABSTRACT:
•	Though ail made efforts, none of the Regions reviewed was able to build strong
identification of a shared vision and values that drove the organizational change
or explained why it was necessary.
•	Each Region reviewed increased customer focus on external partners and
stakeholders, such as States and Tribes. Reorganization disruptions, regardless
of structure, caused short-term, yet still-significant effects on customer service.
•	The hiring freeze and other budgetary complications contributed to little change
in workforce diversity
•	To a significant extent, the five Regions eliminated the middle management layer.
•	Teams are viewed as the key to making many things work, yet establishing
successful teams has proven much harder than anticipated.
•	Regions moved many staff and managers into new jobs as they implemented their
reorganizations, causing significant disruptions. Although there are early positive
indications, it is too soon to tell ifthemovement willyield the anticipated payoff
in cross-training, cross-fertilization and overall facilitation of new ways of
thinking and operating.
CONTINUED ON NEXT PAGE
Chapter 2, Analysis and Overarching Observations: Reinvention Priorities
33

-------
Management Review: Innovative Regional Structures
December 13. 1996
•	The five Regions met the mandate to reach the 1:11 supervisor to employee ratio.
There is widespread dissatisfaction among staff and managers with the effect of
going to 1:11. People are not seeing the changes in management roles and
behavior, empowerment or administrative requirements that were anticipated.
•	Though flourishing in pockets, empowerment has not taken hold as a result of the
reorganizations.
•	Not enough time has elapsed to tell if management roles and behaviors are
significantly changing. Agency culture still fuels expectations that managers will
be program experts rather than coaches, mentors and facilitators.
Overall, the Team observed that all five Regional Offices visited had all attempted to meet the spirit
and intent of some or all Agency reinvention goals, particularly the goal of Streamlined and
Strengthened Organizational Design. The component of the Organizational Design goal related to
achieving a 1:11 supervisor-to-employee ratio was a key driver in all five of the Regional
reorganizations assessed by this Team.
SHARED VISION AND VALUES:
EPA's Reinvention Guidance, Reinventing EPA - Steps Toward a Stronger Workforce, stated that
central features of a reinvented EPA would be the cooperative creation of a shared vision and a
commitment to common values. A vision — the ideal image of the future — was needed to show
how each restructuring organization fit into the Agency's scheme for protecting the environment.
The vision would be best created by group effort and was to be easily understood and continuously
evolving. It was not to be merely something created at the top and imposed on the organization.
Values, according to the Reinvention Guidance, are the broad principles describing ethical behavior,
the way we respond to others, and the commitment to personal and organizational goals. Values
form the basis for organization culture. When personal and organizational values align, there are
increased levels of organizational commitment and understanding about Agency goals.
The Regional Offices visited by the Review Team varied with respect to the attention they paid to
the collaborative creation and communication of a vision, for either the Agency or the Regional
Office, and the conscious identification of organizational values. The senior managers generally
had a fairly clear idea of the direction in which the Regional Office needed to move. Further,
Regions VIII and X, in particular, consciously developed a vision statement through a group effort.
Overall, however, the Team has concluded that the communication of the vision and values was
insufficient to produce all the potential benefits, even within the Regional Offices which made a
major effort. There was no Region where it was clear that everyone knew the vision and values.
While the Team recognizes that it has been a challenge for the entire Agency to define its vision and
Chapter 2, Analysis and Overarching Observations: Reinvention Priorities
34

-------
Management Review: Innovative Regional Structures
December 13, 1996
values with clarity and consistency, we conclude that the Regional Offices, for the most part, missed
an important opportunity to build commitment for their new structure and ways of doing business.
It is important to recognize that several Headquarters senior staff noted that the Agency's senior
leadership paid inadequate attention to articulating what they expected the Regional Offices to
become as a result of the reorganizations. As a result, EPA made it more difficult for each Region
to define its role in the overall effort to protect the environment.
CUSTOMER FOCUS:
Evidence of the Agency's emphasis on customer service can be found throughout the reinvention
efforts of all five Regions. It is manifest both in decisions about organizational structure and efforts
to change organizational culture.
Three of the Regional Offices studied now have State-focused organizational units which are being
very well received by the States. Noteworthy are the three different approaches being taken. Region
X, which historically has had Operations Offices in each of it States, decided to keep and strengthen
these offices, to elevate the role of the directors of each office and strengthen the Operations Office
staff reporting relationships with the media programs in Seattle. Region I established individual,
multi-program units for each State within its Office of Ecosystem Protection. Region VIII brought
together State liaison/project officers for each of its States in a State Assistance Unit. Similarly well
received are the newly formed Tribal assistance/coordinationunits, which in most cases have newly
added resources and report to higher levels of the organizationsthan in the past. Increasing use of
CBEP teams, clearly focused on working with stakeholders, represents yet another example of
greater emphasis on customer focus.
Focusing significantly more energy on external customers can have a downside. All Regions have
a broad array of customer sets, many interested in being the primary customer. Focus on one may
be at the expense of attention paid to another. In choosing to organize differently from Headquarters
programs, Regions I and VIII may have signaled to National Program Managers that they were no
longer seen as the dominant customer. Headquarters offices have found it harder to know who to
contact, who has the authority to speak for the Regional Office, and have a harder time getting all
the right players at national program meetings. These relationship strains and increased transaction
costs understandably do not appear customer focused to these Headquarters offices which see the
Regions as the implementation or service delivery arm for national programs.
The act of reorganizing, almost regardless of structure, had a short-term negative impact on customer
focus. Many old networks of contacts with States, Tribes, Headquarters and others were disrupted
as staff and managers changed positions and then took some time to adjust to new jobs. Many
external customers commented that the Regional Offices became very internally focused in the late
design stages and during implementation of reorganizations, leaving them out in the cold. For
customers dependent on one point of entry or relying heavily on trust developed over a long-term
relationship, this was a significant problem.
Chapter 2, Analysis and Overarching Observations: Reinvention Priorities
35

-------
Management Review: Innovative Regional Structures
December 13, 1996
f c	on an organization's operating approach and the attitude and
Ultimately, customer focu p	g this aspect Qf customer focus is improving too at EPA.
behaviors of employees, n y ^ Rg 'g are increasingly working to facilitate stakeholder
There is clear evidenc	External customers in Region I applauded a "new attitude"
involvement in projec s an	, _ environnlental initiative or focusing compliance assistance
whether it was in working n nro;ects in each Region are successfully demonstrating to many
supportto small businesses CBEP pro^s	^	ion
groups that EPA can be value-added partners
• u	annroach taken by Region X. At the outset they spent time
Of particular note is t e rei	ses discussing them with a broad array of external
identifying their core usinorganization with these core processes in mind. Two of the
stakeholders. They aii e g	red customer focus: Outreach and Environmental
seven core processes i	Qnd Capacity-Building. Improving customer service was
Information Exchange	R • x»sneW organization. An example of the outgrowth of this
a clear driver in giving s ap	ti of m Outreach Forum, where Regional staff with experience
^responSie^outreach from across the organization come to share and build skills.
When an organization	n^b^ho^e^TOlving^re^d^e^^ility^or Stated,
the same a. all levels.	EPA. State senior managers have been hearing clear
this is proving a S1gmf*c	Washington, D.C. and in the Regional Offices about a more
signals from senior Agen y	have d Qn outcomes. In some instances, that
flexible approach to h°w	by the Jtaff negotiating the details of work plans.
within EPA was 3150 reported in 46
enforcement and compliance assistance programs.
DIVERSITY:
As part of their reorganization/reinvention activities, EPA Offices were supposed to take into
consideration cultural diversity issues. The term cultural diversity encompasses not just race,
gender, and ethnicity, but also a variety of other characteristics such as age, functional and
educational backgrounds, organizational tenure, size acceptance, sexual orientation, other lifestyles,
and geographic origins. Having and valuing a diverse workforce can better help EPA achieve its
ipission to protect the environment by providing a wide-range of views and different ways of
approaching challenges than could otherwise be obtained by having employees who all possessed
similar characteristics.
The Team is unable to evaluate the impact the Regional Offices' reorganizations had on cultural
diversity. When we asked management and staff if their reorganizations had a positive or negative
influence on cultural diversity, their responses were based on traditional Equal Employment
Opportunity (EEO) measures rather than the broader characteristics encompassed by cultural
diversity. Part of the reason for this may be that cultural diversity is harder to measure than
traditional EEO characteristics. For example, it is much harder to create a data base that captures
the kind of qualities envisioned by cultural diversity as compared to EEO.
Chapter 2, Analysis and Overarching Observations: Reinvention Priorities
36

-------
Management Review: Innovative Regional Structures
December 13, 1996
However, the Team would like to point out that in our discussions with management and staff at all
five Regional Offices, it was clear that in developing and carrying out their reorganization plans all
of the Regions tried to at least maintain diversity at both the management/supervisorand staff levels.
Based on comments from management and staff, it appears they were largely successful in their
efforts, although some minority staff feel that more could have been done to broaden diversity in the
management ranks, particularly at the Senior Executive level.
STREAMLINED AND STRENGTHENED ORGANIZATIONAL DESIGN:
The Reinvention Guidance encourages Agency decision-makers to design flexible, flatter structures
that enable their organizations to better manage their programs, adapt to change, and respond to new
opportunities. New structures are to: have fewer organizational layers; redeploy administrative staff
to front-line customer service organizations; be more flexible; and satisfy six organizational
"attributes" developed by EPA's Senior Leadership Council.
REDUCED ORGANIZATIONAL LAYERS: In the process of reducing the size of management,
two impacts were noted. To a significant extent, the Regional Offices eliminated the middle
management layer. For instance, Region X eliminated all branch chief positions. The Regions
eliminated a fair number of deputy positions as well. The Team heard concerns that some functions
played by these eliminated layers are not being performed anymore, while others have fallen to first-
line supervisors, adding further to the demands and stress of these positions.
The Regional Offices all made a conscious effort to move as many of the former managers as
possible into front line positions, leading projects and working directly with customers. Whether
as project managers for important, high-visibility projects, or as technical experts, some of the
former managers are thriving. For many, however, the transition from managerial jobs to less clearly
defined roles has been difficult.
FLEXIBILITY: Each Region hoped to build more flexibility into its new structure with increased
use of teams operating across organizational boundaries. Some are oriented around specific
geographic areas, others around agency themes or initiatives, and still others around specific
projects. In theory the Regions will establish specific teams as the need arises, with the intention
of dissolving them when they complete their task. This early in the process, we have only seen the
proliferation of them. If this approach is to succeed in the long run, employees will need to be able
to work well on multiple teams and be able to balance working for more than one boss. So far, the
Regions are all finding it more difficult to get successful teams off the ground than they had hoped.
Not everyone has good team skills and building a successful team dynamic takes time. Successful
teams also need explicit goals and the resources and management support to accomplish them. It
is too soon to tell how much flexibility the teams approach will provide in the near term.
Chapter 2, Analysis and Overarching Observations: Reinvention Priorities
37

-------
, t.,rfs		December 13, 1996
Brfananftmenf Review:			T777- ~"i
	^ Zr ,994 the Senior Leadership Council .dent f.ed six organ,zational
ATTRIBUTES: InNovember 1W4, Administrators were to use m determining how best to
attributes that Assistant ™dfe%lon bili CommUnication and Coordination; Customer Focus;
structure their organizations: Accoum	' ^ Measurement and Evaluation; and Reinvention
Integrity, Efficiency and Effectiveness a CusfomerFocus^ als0 a reinvention goal, are described
and Streamlining. Specific observati	Measurement and Evaluation are described more fully
earlier in this Chapter. Accounta yrh2L„[tr2 essentially addresses Reinvention and Streamlining.
in Chapter 3 of this report.	^ ing attributes follows.
The Team's observations on the remaim K
Hination- The inconsistencies^ organizational structure
• Communication andCoora	&	^ problems. At the Agency
across the Regional Ottices "	d arter rogram offices to explain just how
level, it is increasingly difficul	^ defend this variation "on the Hill", i.e., to
their national program worK	ested in program consistency. There has been
Congress, or to national group	uarters and the Regions while trying to link
significant disruption between	eciflc HeadqUarters offices. This linkage
multi-media Regional units	^ ^ ^ States. Significant movement of staff
issue was also problematic I ^ disruptive. Program staff in Regions are
and managers into new jobs n	networks of people with similar expertise
also struggling to identify ^	caseS th still do not know who to call in
across the Regional Ottices.

other Regions.
Integrity, Efficiency, and Effectiveness'. In incorporating this attribute in their new
organizational designs, EPA managers were ensure that the new structures
maintained or improvedthe efficiency and effectivenessof EPA programs functions
and services. The Team has three major observations about the integrity of Regional
P •
programs:
Small Programs: The long-term health of some of EPA's small
programs (e.g., pesticides, toxics, underground storage tanks, oil
spills) is of serious concern to both Headquarters managers of these
programs and many Regional staff. Although all Regions were
conscious of the potential problems as they considered organizational
designs, most of the Regional Offices either broke up some small
programs or moved them into new groupings and under new
management. Pesticides staff in Regions I and VIII expressed
particular concern about critical mass and increased transaction costs.
These programs have encountered more-than-average disruption in
communications and changed transaction costs. It is too soon to tell
how readily these programs will revive in their new settings or
whether there will be a long-term loss in program efficiency and
effectiveness. EPA should pay close attention to the vital signs of
these programs over the next year or two.
Chapter 2, Analysis and Overarching Observations: Reinvention Priorities

-------
Management Review: Innovative Regional Structures
December 13, 1996
Superfund Program: Regions I, VII and VIII consolidated
Superfund remedial and removal programs as part of their
reorganizations,although none identified this as a driving influence.
In Regions V and X, the predecessor Waste Divisions were divided
to create a Superfund office. The Regions believe the consolidation
or focusing of the program under a single director has enhanced
program flexibility and strengthened Superfund overall.
One consequence of the Superfund consolidations has been that the
laboratories in Regions I and VII have returned to the more traditional
"ESD" organization of the pre-Superfund days, with laboratory and
field units. These offices now have environmental measurement and
analysis as their primary focus. At the other end of the continuum,
concerns about customer focus led Regions V and VIII to dissolve
their ESDs and move the functions into other offices. It is too soon
to tell whether the program offices will benefit from incorporating
these functions and whether these Regions will be able to maintain
the levels of technical expertise necessary to have a robust analytical
program.
Multi-Media Programs: Whether in new multi-media organizations
or through involvement in cross-media teams, it is clear that all the
Regional Offices are investing heavily in providing multi-media
experience for their employees. The learning curve challenges
presented to many staff have generated some down-time and
increased transaction costs in operating these programs, but all the
Regional Offices are making this investment quite consciously. It is
too soon to tell how quickly this investment will be repaid.
OTHER OBSERVATIONS ABOUT ORGANIZATIONAL DESIGN:
• Alignment with Headquarters: Though free to design their own structure, Regions
ultimately had to make a major choice between a structure that fundamentally
mirrored Headquarters or broke new ground. Regions I and VIII chose to make
alignment with Headquarters one factor among many. While alignment with
Headquarters did not turn out to drive the macro-structure in Regions I and VIII, it
is worth noting that the substructures within each Region's multi-media offices bear
a considerable resemblance to the Headquarters media-based programs. Regions V
and VII made conscious decisions early on to place a premium on retaining
alignment with the Headquarters' structure. After identifying core processes, Region
X's Design Team recommended, and the Region's senior managers agreed, that the
Region should retain its media-specific programs and supplement them with new
offices directly responsive to Agency strategic and reinvention goals.
Chapter 2, Analysis and Overarching Observations: Reinvention Priorities
39

-------
Management Review: Innovative Regional Structures
December 13, 1996
Lack of structural alignment with Headquarters offices is perceived by some in
Headquarters to be at the heart of inefficiencies in communication, coordination and
transaction costs. It raises questions about who to call, who has authority to speak
for the Regions, how many people have to attend national meetings.
NEW WAYS OF OPERATING:
Vice President Gore's 1993 NPR report recommended that Federal agencies double their supervisor-
to-staff ratio by the close of FY 1998. Doubling the supervisor-to-staff ratio was intended "to give
decision-making power to those who do the work, pruning layer upon layer of managerial
overgrowth." Increasing a manager's span of control was to have many results, including:
•	Empowering employees to be innovative and accountable for serving customers and
getting results.
•	Promoting a change in management behavior from "command-and-control" to
coaching and mentoring employees.
•	Promoting a change in the role of managers from technical experts to organizational
leaders.
•	Reducing organizational layers, where appropriate, to achieve flatter, more flexible
and less bureaucratic structures.
•	Fostering teamwork as a flexible and collaborative means for carrying out work.
•	Expediting the flow of information between frontline Federal workers and top agency
administrators.
To address the NPR recommendation, as well as a September 1993 Presidential Memorandum to
Department and Agency Heads, "Streamlining the Bureaucracy," EPA had to double its ratio from
1:5.5 in September 1993 to 1:11 by September 30, 1998. In September 1994, Administrator
Browner— in order to accelerate the process of organizational and management change at EPA —
decided to move up the deadline for EPA offices to reach 1:11 supervisor/staff ratio by two years.
In order to reach the 1:11 ratio by September 30,1996, most EPA offices reorganized in some form
or fashion.
In assessing the Regional reorganizations, the Review Team considered progress the Regional
Offices made in reaching the results envisioned by the NPR, particularly the 1:11
Supervisor/EmployeeRatio, Empowerment, Teams, and Redefined Management Behavior. The
Review Team also considered any training or transition assistance that the Regional Offices have
offered or are offering to help their managers and staff operate in a new way — one that is more
effective, flexible, and responsive in achieving the Agency's environmental mission and in
addressing the nation's environmental challenges.
Chapter 2, Analysis and Overarching Observations: Reinvention Priorities
40

-------
Management Review: Innovative Regional Structures
December 13, 1996
1:11 SUPERVISOR-TO-STAFF RATIO: All five of the Regional Offices visited by the Team
achieved the 1:11 supervisor-to-employeeratio during FY 1995, one year before the Administrator's
accelerated deadline. To reach the 1:11 ratio, the Regional Offices had to eliminate organizational
or management layers, which is consistent with the NPR. For instance, Region I reduced its number
of managers from 92 to 63 by eliminating many middle manager positions. Region VII went from
74 managers to 41 by eliminating a layer of supervisors Region-wide. Region VIII decreased its
number of managers from 88 to 46 and eliminated at least one layer of management, the Deputy
Director and, in some cases, the Section Chief. Region X reduced its number of supervisors from
76 to 46 by eliminating the second-level supervisor positions, the Branch Chiefs. To assess how the
1:11 ratio is affecting Regional operations, the Team talked with Regional senior managers,
supervisors, former supervisors who moved into nonsupervisory positions, and staff. The Team also
interviewed Headquarters managers and staff, and State and Tribal representatives.
For the most part, the Team heard incredibly negative comments about the effect of reaching 1:11,
even from senior managers in the Regional Offices. Most Regional managers and staff feel that the
mandate for agencies to double the existing span of control is not grounded in any analysis or critical
evaluation of the Agency. The Team heard "arbitrary" on more than one occasion to describe why
1:11 as opposed to any other ratio. They also believe that the one-size-fits-all mandate does not take
into account the different types of work performed, and the varying amounts of supervision that are
required depending on the work. A few argue that it does not recognize the special role that Federal
managers play in safeguarding the integrity of programs and activities funded with American tax
dollars. Nevertheless, managers and staff at all levels and in all five Regions are doing the best they
can to adjust to the wider span of control, but it has not been easy and they are struggling.
To achieve a Region-wide ratio of 1:11, many first-line supervisors are managing far more than 11
staff in order to accommodate smaller Immediate Office staffs. The 1:11 also does not account for
those people supervisors must manage who are not part of the EPA FTE count, such as Senior
Environmental Employee (SEE) program enrollees.
The wider spans of control in the Regional Offices are complicated by a variety of factors:
•	Managers of new multi-media offices have more programs to manage, in addition to
more people.
•	Some managers are new to supervision, having been promoted as a result of a
reorganization placement process.
•	Some managers and/or their staff, reassigned as a result of a reorganization
placement process, are working on programs with which they are unfamiliar and
having to learn.
•	Some managers with more people and more responsibilities are expected to "get out
to the field," so their staffs feel orphaned. We heard frustration about this from both
managers and their staffs.
Chapter 2, Analysis and Overarching Observations: Reinvention Priorities
41
!
[
i

-------
Management Review: Innovative Regional Structure^
December 13, 1996
. .. ¦ dually are contributing to a climate of frustration in the
These factors, collectively and in iv ' an
-------
Management Review: Innovative Regional Structures
December 13, 1996
spend as much time on the technical details of all ongoing activities, but may have
to spend more time with those employees who do not want to accept full
responsibility or accountability.
•	Some managers are not yet willing to "let go."
•	Many throughout Headquarters and some States expect Regional managers to know
the technical programmatic details and serve as the primary contact.
REDEFINED MANAGEMENT BEHAVIOR: The linkage of empowerment to redefined
management behavior is a strong one. If a manager does not trust capable employees, or does not
choose to give them the freedom, skills, authority, and accountability to get their jobs done,
empowerment will not happen. Key to fostering empowerment is successful redefinition of the
management role at EPA. The Team believes that not enough time has elapsed since the Regional
reorganizations were implemented for management behaviors to truly change. We also believe that
the disruption of the FY 1996 Government shutdowns and the resulting limits on training and
transition assistance during that critical time have delayed the change.
At the Senior Executive level in a few of the Regional Offices, there seems to be more emphasis on
working together as a management team to focus on bigger picture, strategic issues, and delegating
the technical matters to first-line supervisors and their staffs. For instance, the senior leaders in
Regions VII and VIII stated that they are trying to model the behaviors they would like those under
them to exhibit: acting as a team, consensus-building, and "corporate leadership." A few staff in
Region VIII did indicate that they had observed this new behavior. However, a number of staff in
Regions I, V, and VII commented on the fact that the SES managers seemed to "feel no pain" in
terms of having to change their behaviors.
A number of first-line supervisors the Team interviewed believe that the concept of managers as
coaches and facilitators is oversimplified. They believe that there should be a balance between the
"human resource" responsibilities of coaching and mentoring, and program management
responsibilities for which they are accountable. Part of their frustration is that in reorganizing, the
Regional Offices spent considerable time talking about the new behaviors that managers are
supposed to demonstrate, but did not effectively define the new roles of managers at all levels. For
instance, Region X senior managers clearly defined the new behaviors that managers are supposed
to exhibit, but did not effectively describe the resulting change in the roles and responsibilities of
Executive Team managers, first-line supervisors (i.e., the Region's "unit supervisors"), the senior
nonsupervisors (former managers), and staff. For instance, who has signature authority? Who
concurs? As another example, Region V emphasized the role of the Team Leader positions in
program management so much that the first-line supervisors believe their roles were devalued, that
their role now is merely "human resource managers" who sign time cards and leave slips.
Many supervisors are torn in attempting to empower their staff to perform the day-to-day program
management because their own managers, Headquarters, or even their State and Tribal customers,
expect them to know the details of the programs and serve as technical experts. Their empowerment
Chapter 2, Analysis and Overarching Observations: Reinvention Priorities
43

-------
Management Review: Innovative Regional Structures
December 13, 1996
me Headquarters and States preferences to deal only with
efforts are further complicated by som Headquarters managers and staff seemed to validate this
managers. The Team's discussions wi	al offices because they believe they themselves are
sentiment. Many sympathized with tne	with the Administrator's Office, Congress, and
expected to know the details in their discu
other parties.
tttment of some former managers whose supervisory positions
Another complicating factor is the rese. - zation. while the Team heard from a number of these
were eliminated as a result ofthe^reo g ^ bnger be supervisors, others did express a sense of
former managers that they are relieve , CQncems about their perceptions that certain former
"failure." Some managers and stall r esandRegionaleffortsto instill new patterns of behavior.
supervisors are weakeningthe new stru	noted that SQme former supervisors are flourishing.
Despite these perceptions, the Revtew Team
TEAMS: To move towards a more collaborative way of working together, and to increase flexibility
in program management, each of the Regions visited are making a real effort to work more in teams
They recognize that this does not happen overnight and are helping managers and staff learn how
to build the skills needed for successful team work.
Senior leadership is modeling more effective team work by working together on more corporate and
strategic leadership. As they strengthen in this way, they risk pulling away from the rest of the
organization. The Team heard first-level supervisors in Region X say that they felt a widening gap
between them and the senior leadership team. Region VIII's Regional Leadership Team, comprising
50 program and senior managers, shows promise for building better participative decision making
and better communications among the Region's managers.
Creating a team-based organization requires that structures and processes are in place to provide the
necessary support and training for teams. Region VIII's Change Team, and Region X's
Organizational Effectiveness Team and Teaming Cadre are positive examples of these kinds of
structures. Region VII is implementing a major team training effort. These supportive efforts will
be extremely important in addressing the findings of the Review Team regarding a lack of
understanding on what is a team, and when and how to use teams, as well as a lack of clarity in
definition, roles and responsibilities for teams, team leaders and team members. The Agency has
yet to put in place the national systems which will support and encourage team behavior (e.g
performance appraisal and recognition systems.)
Some major cross organizational teams (e.g., Region V's enforcement team, Region VII's multi-
media enforcement team) are working well. Key ingredients for success seem to be high visibility
having a well defined mission, senior leadership team support, and full time leadership. The Team
found that some organizations have set up matrix management structures as a way to work more
collaboratively through cross-organization teams, although they do not seem to have the necessary
knowledge or skills to do so effectively. The Review Team did not find much evidence that Regions
were providing support in terms of skills and training specifically geared toward managing in a
matrix environment or working in matrix teams.
Chapter 2, Analysis and Overarching Observations: Reinvention Priorities
44

-------
Management Review: Innovative Regional Structures
December 13, 1996
Some failures in using teams are giving the word a bad name, creating a perception that using teams
is a fad that will be dropped when the new "flavor of the month" comes along. The Team heard
comparisons to prior TQM programs. While not implying that Region V's Regional Tearns are not
working, we note that those teams are seen as "superstar" vehicles. There is also a perception that
some Regions are using teams as a way to address the issue of what to do with former supervisors,
by moving them into team leader positions.
TRANSITION ASSISTANCE: Each of the Regional Offices recognized the need to assist Regional
employees in learning to operate in a new, less hierarchical and bureaucratic way that fosters
empowerment, new management behaviors, and teamwork. For instance, Region I has offered
placement process counseling, and all the Regional Offices are exploring and offering training on
teams, mentoring, dealing with change, and career counseling.
The Review Team noted that transition assistance has been less available for staff in some Regions,
focusing more on the management level. In addition, there has not been adequate support for people
moving into new areas or new positions. The lack of training or transition assistance for this staff
is especially acute if their boss is new to the program or position as well.
Chapter 2, Analysis and Overarching Observations: Reinvention Priorities
45

-------
Management Review: Innovative Regional Structures
December 13, 1996
Chapter 2, Analysis and Overarching Observations: Reinvention Priorities
46

-------
Management Review: Innovative Regional Structures
December 13, 1996
CHAPTER 3
ANALYSES AND OVERARCHING OBSERVATIONS
ACCOUNTABILITY AND INTEGRITY
DESCRIPTION: This area focuses on whether the Regional reorganisations have
positioned the Offices to establish appropriate organizational structures, policies, and
procedures to provide reasonable assurance that the goals/objectives of Agency senior
leaders are carried out effectively, efficiently, and in compliance-with applicable laws,
regulations, and central agency guidance.
ABSTRACT:
•	The budget, finance, contracts and grants operations of the Regions were not
significantly impacted by the reorganizations,
•	Reconciling the ever-increasingemphasis on multi-media work with the Agency's
media-specific budget structure is a continuing challenge for the Regions.
•	Although there is no question that there were short-term downturns in
productivity due to implementation of the reorganizations — as well as the FY
1996 Government shutdowns, EPA's potential 34% budget reduction and R1F
situation — it is too soon to tell whether the reorganizations have had a lasting
affect on program efficiency, effectiveness and accountability.
NOTE: In reviewing this area, the Team was sensitive to the unique nature of the
fiscal climate in FY 1996. During the first quarter of FY 1996, and part of the
second quarter, EPA faced a potential 34% cut in its budget. During the entire Fiscal
Year, EPA operated under 14 Continuing Resolutions before finally receiving an
enacted Operating Budget. Two Government shutdowns and 14 Continuing
Resolutions in one Fiscal Year is unprecedented in EPA's history.
The Review Team looked at two issues related to Accountability and Integrity: Resource and
Management Integrity, and Program Accountability.
Chapter 3, Analyses and Observations: Accountability and Integrity
47

-------
Management Review: Innovative Regional Structures
December 13, 1996
RESOURCE AND MANAGEMENT INTEGRITY:
In the area of Resource and Management Integrity, the Review Team tried to get an idea of how the
Regional reorganizations have affected the Regions' budget, finance, contracts, and grants
operations. The Team sought answers to three basic questions:
•	Effect of Reorganizations on Resource Management Activities: What effects did
the Regional reorganizations have on both the structure and processes of the Regions'
budget, finance, contracts, and grants activities?
•	Charging of Activities to Appropriate Program Budget Elements: Are the
Regional Offices able to charge their activities to the appropriate program budget
elements, especially those Regions that made the most significant changes?
•	More Effective Use of Resources: As a result of the reorganizations, are the
Regional Offices more effectively allocating their resources?
EFFECT OF REORGANIZATIONSON RESOURCE MANAGEMENT ACTIVITIES: With
two exceptions, the budget, finance, contracts, and grants operations of the five Regional Offices
visited were not significantly affected by the reorganizations. Typically, only minor changes were
made to organizational structures in those areas to achieve the 1:11 supervisor-to-staff ratio. For
example, one Region consolidated contracts and small purchases, and another combined contracts
and facilities. More importantly, there was not much movement of people, especially the key people
such as the Budget Officer and the Financial Management Officer (FMO). As a result, these
organizations retained both their institutional memory, as well as many of their most experienced
and talented personnel. This was fortuitous given the problems the Agency had in obtaining its FY
1996 budget.
The two major changes involving resource management activities took place in Regions I and V,
which transferred their planning functions from the resources management organization to other
organizations. Region I placed the planning function in its Office of Ecosystems Protection, while
Region V placed the function in its Office of Strategic Environmental Analysis. Both Regions'
budget offices remain involved in the planning process, but no longer lead those efforts.
The splitting of the planning and resource management functions in Regions I and V is notable
because NAPA's report, Setting Priorities. Getting Results, includes a recommendation that EPA
merge the two Headquarters offices with leads for these functions—the Office of Policy, Planning
and Evaluation (OPPE) and the Office of Administrationand Resources Management (0ARM). The
intention behind this recommendation is to "give substance to the Agency's strategic planning
process, and the new office's control of the budget process would provide managers with a strong
incentive to heed the agency's policy and planning guidance more closely." EPA is responding to
this recommendation by transferring OARM's Office of the Comptroller, OPPE's planning and
evaluation functions, and a few other administrative functions from OARM to a new Office of the
Chief Financial Officer (OCFO).
Chapter 3, Analyses and Observations: Accountability and Integrity	~
48

-------
Management Review: Innovative Regional Structures
December 13, 1996
Given these organizational changes taking place in Headquarters, some Headquarters officials are
concerned that in splitting their planning and budgeting functions, Regions I and V will be heading
in a direction different from the rest of EPA. They also are concerned that splitting these functions
may diminish the authority of the Regions' Senior Resource Officials.
CHARGING OF ACTIVITIES TO APPROPRIATE PROGRAM BUDGET ELEMENTS:
EPA, as a whole, has always had difficulty tracking its activities back to the Agency's individual
program budget elements. This is especially true in recent years as EPA has taken on more
initiatives and moved towards a multi-media orientation, while its program and budget structure
remains largely media-specific. However, efforts are underway to incorporate more multi-media
program budget elements into the Agency's budget structure, which should help to alleviate this
concern. In addition, EPA has begun a Resource Accountability Project, with Regions I, III, and X
serving as the pilots. The purpose of the project is to improve the Agency's ability to reliably charge
its activities back to the appropriate program budget elements.
All five Regional Offices have given this matter a great deal of thought and expended a lot of effort
trying to make sure that they had appropriate policies and procedures for charging their activities to
the proper program budget elements. For example, in Region VIII, the budget staff interviewed all
the Regional office staff to find out what activities they work on, in order make sure that the staff s
efforts are properly charged. Consequently, these five Regional Offices believe they are able to
reliably charge their activities back to the appropriate program budget elements, although in some
cases the linkage is not always as clear as they would like.
During our interviews with the Headquarters program offices, all of them expressed concern over
the reorganized Regions' abilities to charge their activities to the proper program budget elements.
This was especially true for those Regions that departed the most from the traditional organizational
structure. However, the Tearn was unable to draw any definitive conclusions regarding the Regions'
abilities to charge their activities to the appropriate program budget elements because of the
difficulties the Agency had in obtaining an enacted FY 1996 budget — two furloughs and 14
Continuing Resolutions (CRs) — and the short time the reorganizations have been in effect.
This issue may take on greater significance in the future because, beginning in FY 1998, all Federal
agencies, subject to the Chief Financial Officers Act (CFO Act), will be required to prepare financial
statements that include their budgetary accounts. Consequently, all EPA budgetary accounts will
be subject to audit by the OIG. Thus, it is important that the Agency have adequate policies and
procedures in place to ensure that it can properly charge its activities back to the appropriate program
budget elements. Failure to do so could result in the OIG asserting that the Agency has not properly
accounted for its budgetary resources. Such claims could have an adverse effect on EPA's
operations and credibility.
MORE EFFECTIVE USE OF RESOURCES: Although many of the Regions'
reinvention/reorganization plans contained statements about better targeting their resources, the
Chapter 3, Analyses and Observations; Accountability and Integrity
49

-------
Management Review: Innovative Regional Structures
December 13, 1996
Review Team did not find any clear evidence that this was occurring. The Team did come across
some innovative approaches to resource management in Regions V and X.
Region V has created a Resources Management Committee (RMC), which consists of program
division directors and senior budget personnel. The RMC's role is to make the Region's day-to-da
resource management decisions, in order to provide the Region V Senior Leadership Team (SLT^
with more time to focus on strategic issues. In the past, the SLT was responsible for making these
day-to-day resource management decisions which distracted them from the bigger, more strategic
issues.
Region X, as part of their reinvention endeavors, identified "resource focusing" as one of its core
processes. Resource focusing is concerned with such questions as: determining whether the Agenc
should take on specific projects, where to route them, and what our role should be in these projects
In making such decisions, reliance will be placed on such factors as risk analysis, resource
considerations, and EPA's value-addedrole. Unfortunately,due to the budget problems the Regional
Office has not had an opportunity to try out this idea. However, it hopes to have the opportunity to
try it this year. The Team believes this concept is promising and deserves watching to see how it
works.
At all five Regional Offices that the Team visited, we heard from managers and staff alike that the
Agency has taken on more and more initiatives over the years, but has not truly disinvested from any
of its previous activities. As a result, management and staff perceive that the Agency has spread
itself too thin. They expressed the belief that the Agency could better accomplish its mission of
protecting the environment by focusing its efforts in those areas where the Agency can make the
most difference. It is also interesting to note that the Team heard the same comments from our
external stakeholders (States and the regulated communities) in one of the Regions the Team visited
PROGRAM ACCOUNTABILITY
Program accountability focuses on the mechanisms the Agency uses to ensure that its programs are
efficiently and effectively operated, and include such things as clear assignment of responsibilities
and effective coordination and communications.
As part of our review, the Review Team wanted to determine what effect, if any, the Regional
reorganizations have had on program accountability. However, the Review Team generally was
unable to do so because insufficienttime has elapsed since the Regional Offices reorganized to allow
enough evidence to accumulate to draw firm conclusions one way or another. Nevertheless the
Review Team does have a couple of preliminary observations which are noted below. In addition
the Team has noted comments about EPA's small programs and the Superfund program, related to
both program accountability and the Agency's reinvention goals, in Chapter 2 of this report, in the
Attributes section focusing on Integrity, Efficiency, and Effectiveness.
• Memorandum of Agreement (MOA): The MOA process needs fixing. In
discussions with both Headquarters program offices and Regional Offices, the Team
Chapter 3, Analyses and Observations: Accountability and Integrity
50

-------
Management Review: Innovative Regional Structures
December 13, 1996
was told that the Headquarters National Program Managers are negotiating MOAs
at different times of the year, that the MOAs have different time horizons, and in
some instances set unrealistic goals. As a result, the Regional Offices are unable to
make a coordinated and comprehensive review of the MOAs. This may result in the
Regional Offices agreeing to do more work than they have people to do it. Also, the
agreements may not provide the flexibility the Regional Offices need to manage their
responsibilities effectively.
HQ Assistance: There is a need for Headquarters to develop systems that can better
capture the Agency's multi-media, pollution prevention, and compliance assurance
successes. Three of the Regional Offices the Team visited (Regions I, VIII, and X)
are making efforts to develop such systems.
With the implementation of the Government Performance and Results Act (GPRA)
just around the bend, it is important for the Agency to have systems that allow it to
measure its successes at both the local and national levels.
Chapter 3, Analyses and Observations: Accountability and Integrity
51

-------
Management Review: Innovative Regional Structures	 December 13, 1996
Chapter 3, Analyses and Observations: Accountability and Integrity

-------
Management Review: Innovative Regional Structures
December 13, 1996
CHAPTER 4
ANALYSES AND OVERARCHING OBSERVATIONS
PROCESSES FOR REORGANIZING
DESCRIPTION: This chapter focuses on the processes the Regional Offices used to
design, implement, and evaluate their new organizational structures, and the processes
the Regional Offices used to move managers and staff into new positions and/or new
organizations resulting from the reorganization.
ABSTRACT:
•	Defining and clearly communicatingthe reorganization decision-making process
makes a difference in employee acceptance of the ultimate outcome. Some
Regions did this well, others less well.
•	All Regions used "design" teams in helping senior management with
reorganization planning. The success of these teams was influenced by varying
degrees of participation and empowerment, and the team's relationship with
senior management.
•	Regions made significant efforts to reach out to external stakeholders and
partners. Less attention was paid to reaching out to internal stakeholders in the
Headquarters Offices.
•	All Regions used some iorm oi external organizational cnange consulting and
most agreed they would recommend it to others.
•	All Regions underestimated the productivity downtime and the emotional reaction
accompanying major changes.
Chapter 4, Analyses and Observations: Processes for Reorganizing
53

-------
Management Review: Innovative Regional Structures
December 13, 1996
PROCESSES FOR REORGANIZING:
DESIGN: Each Region chose to use a Design Team to develop the new organizational design,
either using senior management's initial approach or building on a more participative model. These
Design Teams were used with varying degrees of success. One element of success was clarifying
and clearly communicating the process and accountability for making reorganization decisions up
front so that all members of the Regional Office understood them. Region X did a particularly good
job of clarifying these expectations up front. In Regions I, V and VII, the decision making processes
and empowerment levels were not clearly defined and communicated. This resulted in some
disenfranchised Design Teams and in lower overall morale, particularly in Region I.
Another factor for success in the design phase was senior management support for the Design Team,
and as well as their involvement and communications with staff. The Review Team noted the
partnership between the Senior Leadership Team and the Design Team in Region VIII was
particularly effective. In Regions VIII and X particularly, the RA and DRA actively solicited
comments and concerns from the staff. In Region X, the RA personally received and read over 400
LAN messages from employees, and in Region VIII the DRA held monthly sessions with the
Transition Monitoring Team, a subgroup of the local HRC to hear and respond to employee
concerns.
Region X's initial work on identifying and obtaining consensus around their core work processes
was a unique and thoughtful approach to designing the organization's structure. This provided a
strong framework for the structure and was a valid, convincing justification for the resultant
decisions.
The Regions each used the Senior Leadership Council to inform Headquarters of their proposed
reorganizations. However, they did not uniformly work with other Headquarters managers early in
the design phase. At least in Region VIII, had senior management consulted with the Headquarters
Program Office Directors earlier in the design process they could have avoided some resultant
questions and concerns. All of the Regions kept the States and Tribes informed of the reorganization
plans and allowed them opportunity to comment of the proposals.
IMPLEMENTATION: Each of the five Regions used external organizational change consultants
to some extent, and strongly recommended that others seeking to reorganize should bring in
consultants early in the process. Region X brought in a consultant on an appointment to the
Regional Office to assist in the reorganization planning, and kept that person on to assist with
transition issues. Other Regions used consultants for training in organizational change and career
planning for those impacted by the placement process. Region VIII's Senior Leadership Team and
Design Team relied on William Bridges' book Managing Transitions in planning specific activities
and in understanding the impacts of change on the organization. The Review Team notes that
transition assistance has been somewhat less available for staff in some Regions, which focused
more on the management levels. As prepared as they were for disruption from the changes, the
Regions, especially I, VIII and X, underestimated the amount of disruption that the reorganizations
would cause.
Chapter 4, Analyses and Observations: Processes for Reorganizing
54

-------
Management Review: Innovative Regional Structures
December 13, 1996
Most Regions also chose to use an Implementation Team to manage the logistics of implementing
the reorganization, from people placement to office moves. As in the use of Design Teams, they
varied in their success. For the Implementation Teams in particular, staffing them with the right
people was critical. For example, Region X managers now believe that the Regional Office would
have been more effective in making office moves had the facilities and infrastructure staff been on
the Infrastructure Team. The Review Team believes that several problems, such as multiple
advertisements for the same position, could have been avoided in Region V if the human resources
staff had been actively involved in the placement process.
Due in part to the short deadline for implementation, and in some cases the FY 1996 budget crisis,
there seemed to be insufficient planning for the necessary infrastructure changes (e.g., mail, phones,
moves) or insufficient time for those plans to be implemented carefully. All organizations felt that
the implementation phase was too rushed, but agreed that a deadline for completion was a needed
driver. Although some organizations could have used more time in implementation, they realized
that waiting meant that their reorganization would be delayed indefinitely by the uncertainties posed
by a potentially huge budget reduction, a possible RIF and a likely appropriations stalemate. Given
those uncertainties, they chose to move forward more quickly.
COMMUNICATIONS AND INVOLVEMENT: The Team noted that all five Regions focused
on internal communications throughout the reorganization process. However, the effectiveness and
quality of those communications varied. For example, Region VIII management believes they made
enormous efforts in making sure that employees had all available information during the process.
However, some employees were turned off by "information overload." This sentiment was shared
by staff in Regions VII and X as well.
The Review Team heard some staff complaints of a perception that senior managers knew in
advance what their reorganization should look like, thus freezing from the outset any staff concerns
or comments to the contrary. However, the Team heard from senior managers that they were
disappointed with what they perceived as staff s mostly parochial ideas about how the Offices should
organize to accomplish the work in new ways. Region VIII had the most inclusive design process
of the five Regions reviewed, and although it caused major disruption, the Regional staff felt that
their senior managers made an attempt to be open and fair. In Regions I and VII there is some
lingering dissatisfaction attributed to the rejection of the Design Team proposals in favor of those
developed by senior management.
Headquarters Offices, in general, were not satisfied with the levels of communication between the
reorganizing Regional Offices and Headquarters. They felt that the Regional Offices did not view
Headquarters as a client, but rather "as an afterthought." A perception articulated by a number of
Headquarters managers and staff was that the Regions "could do whatever they wanted" in
reorganizing, and Headquarters could comment but would be seen as an obstacle to change. Most
noted that they did receive the reorganization proposals for formal review and comment as part of
the Agency Directives Clearance Process. However, some indicated that "sending around a big
package for comment is not a way to say Headquarters was involved."
Chapter 4, Analyses and Observations: Processes for Reorganizing
55

-------
Management Review: Innovative Regional Structures
December 13, 1996
f UoaHnimrtprs interviewees was the desire for the reorganizing Regional
A recurring theme rom to_face communication with them. For instance, managers from three
°®ces t0^aV,e rtTrToffices said they would have appreciated it if the Regions had made more
different Headquarters Offices saia^tney	^^^	^	^ ^
of an effort to exp a	hplnful for the Regions which moved personnel to have brought
suggestedthat it	so they could meet and initiate face-to-fL
the new Regional prog	^ managers acknowledged that Regions made presentations
discussions.	structures being proposed, they felt that
to the Assistan m	the ^ meets the road ievei" __ the Office Director level and
communication was n q	those structures, how were they planning
below — about how the Regions were going w	,
ZZ with accountability, and how they were gang to del.ver results.
UNION INVOLVEMENT: Regions I, VII and VIII included union representatives in their
reorganization processes with differing results. Region V did not have union representation at the
time, but the issue did assert itself later when Regional employees voted to establish a bargaining
unit. Region X does not have a bargaining unit.
Region I has traditionally had a good relationship with its union representatives, and made them an
integral part of their reorganization process. The union remained a cooperative partner throughout
the design and implementationof the Region's new multi-media structure, and concluded the process
without complaints, filing of official grievances, or any other hindering actions.
Region VII also included a union representative during each step of the reorganization. Upon
implementation, the union was in agreement with senior management's proposal, and presented no
complaints with the plan.
Region VIII, as the other of two Regions deciding on a multi-media structure, implemented an
ambitious and complex reorganization. They too included a union representative on both the Design
and Implementation Teams. Although the Region maintained an open and cooperative relationship
with the union, the extent of the proposed changes to the Region's traditional programs presented
problems that apparently could not be resolved. The union submitted a demand to bargain on several
specific issues when very close to implementation, and after the contractual deadline. The Region
declined to bargain.
PEOPLE PLACEMENT: Most organizations took advantage of the opportunity to allow those
employees and managers who wanted to make a move to do so. Every Region tried to offer choices
or options to those who moved, and solicited their preferences. For the most part, staff and managers
were reassigned into new positions using an informal selection process. Some positions were
formally advertised and those interested could apply. In part to build diversity and -new blood into
the management corps, some Regions opened up a few of the new supervisory positions to non-
supervisors.
Chapter 4, Analyses and Observations: Processes for Reorganizing
56

-------
Management Review: Innovative Regional Structures
December 13, 1996
Most Regions gave existing managers the choice to stay in or move out of supervisory positions as
part of the process of reducing the number of supervisors. The development of some senior
technical/program expert positions eased the transitions for some former supervisors. These
positions were generally not available to everyone in the Regional Office. This has resulted in some
staff being resentful that those opportunities were closed off to them, and they believe that this will
have a negative impact on their career growth potential. The Team heard this comment frequently
in Regions VIII and X.
Despite generally successful staff and management placement processes in most organizations, the
Review Team did hear some concerns. Staff in every Region perceived that the SES managers held
themselves harmless during the placement process; that is, no SES manager was ever in danger of
losing a management position. Staff generally did not view this as a positive indication that the
Regional Office was serious about making significant changes. Also, employees in Regions I, V and
X viewed the staff placement process as very rushed. For example, the Team heard from some
Region X employees that they only had one day to make major career decisions about which
positions for which they wanted to be considered. The process for people placement in Region V
was unclear to employees, leading to unanticipated problems later. Some people were assigned to
positions in Region V that are now being competed.
In addition to shrinking the size of the management staff, Regional senior leaders decided to move
many managers around, assigning them to manage programs or functions which they may not have
worked in before. Similarly, to promote cross-fertilization of program knowledge and experience
across each Region, senior leaders in all five Regions gave staff the opportunity to work on new
programs or functions as well. All five Regions carried out their personnel moves all at one time.
It is too soon to tell whether the smaller size of the management staff and the movement of people
to different functions will have the anticipated payoffs of cross-training, program cross-fertilization,
and overall facilitation of new ways of thinking and operating. However, the Review Team did
observe that where the shifts in management and staff were the most dramatic — Regions VII, VIII
and X — there was tremendous disruption. Because a number of managers and staff are new to the
programs they are now running, and are just beginning to possess the knowledge, experience and
networks of contacts of their predecessors, they face a tremendous learning curve.
Managers and staff in both Headquarters and the Regional Offices, as well as customers in States
and Tribes, expressed frustration that work seemed to stop for weeks or months as the Regional
Offices were implementing their reorganizations and getting people into place. This was
complicated by the disruptions created by the government shutdowns and resulting furloughs. They
also commented that new managers and staff did not have the institutional memory to answer
questions or provide needed information.
The Team heard from managers and staff in more than one Region that the "stirring of the pot" of
Regional managers and staff is not a bad idea, but should be made in phases. Region X plans to
continue to implement this cross-fertilization by moving one-third of its senior experts and
supervisors every three years.
Chapter 4, Analyses and Observations: Processes for Reorganizing
57

-------
Management Review: Innovative Regional Structures
December 13. 19 9e
MEASUREMENT AND EVALUATION: Regions I, VIII and X have processes underway to
conduct mid-course assessments of the new organizations, and plan to conduct more in-deDth
assessments in the future. Region VIII seems to be particularly effective in identifying what is not
working in the new organization and has a plan for addressing those issues. Region X's mid-course
assessment team attended the interview sessions held by the Review Team as part of their internal
assessment. This attention to continuous improvement will be important to the success of the new
organizations.
Chapter 4, Analyses and Observati°ns: Processes for Reorganizing
58

-------
Management Review: Innovative Regional Structures
December 13, 1996
CHAPTER 5
OTHER ISSUES
DESCRIPTION: The Review Team, in assembling the report summary, had a number
of observations in areas that could not clearly be categorizedin any ofprevious chapters.
This Chapter includes these observations, which generally include: inter-Regional
communications; infrastructure costs; role of the Senior Leadership Council (SLC); and
assessments by several State officials.
ABSTRACT:
•	Some Headquarters officials believe the SLC did not make tough choices about
how to organize the Agency as a whole, before allowing individual offices to
reorganize.
•	The Agency's processes for designing, reviewing, and approving reorganization
proposals is flawed.
•	Most of the five reviewed Regions underestimated Infrastructure support costs
associated with their reorganizations.
•	Not only do Headquarters and State officials experience problems in
communicating with the reorganized Regions, so do other Regions.
•	The burden on managers from EPA's cumbersome performance management
system axe felt even more acutely now that the supervisor-to-staff ratio has
widened to 1:11.
•	Some stakeholdersin Headquarters, the States, and within the Regionsthemselves
believe that die positive changes made to improve the Regional delivery of
programs could have been achieved without reorganizing.
SENIOR LEADERSHIP COUNCIL (SLC) DECISION-MAKING: A few vocal Headquarters
managers suggested that before allowing any office to reorganize during FY 1995, EPA should have
Chapter 5, Other Issues
59

-------
Management Review: Innovative Regional Structures
December 13, 1996
examined its organizational structure — behemoth that it is — from an Agency-wide, big picture
perspective first. They expressed strong opinions that the Regions need to be organized in a way that
makes sense to both the States and Congress, especially in the ability to provide coherent and needed
data to both. They suggested that once those tough decisions were made about how to best organize
the 17,000 EPA staff and 40,000 State staff to perform the nation's environmental work, only then
should EPA have allowed offices to proceed with their individual reorganizational proposals.
Not surprisingly, a number of Headquarters managers and staff see no wisdom in the SLC's decision
to allow inconsistency across the Regions. Their major concerns are program consistency and
continuity. Several Headquarters managers expressed concern that the Regional Offices are now
organized differently and have their own Regional program priorities, in addition to national
program priorities. They fear that the Agency is losing program continuity flow from Headquarters
to the Regions to the States. They are concerned that national program consistency will be
negatively affected as the Regions focus more attention on their own priorities, at the expense of
national priorities.
EPA'S REVIEW AND APPROVAL PROCESS FOR REORGANIZATIONS: The Agency's
senior leadership — while open to innovative and wide-ranging changes — wanted to ensure that
appropriate review and discussion of AA/RA/Associate Administrator-level proposals took place.
Therefore, the SLC establisheda procedure, now part of the Agency's Directives Clearance Process,
for reviewing and approving FY 1995 AA/RA/Associate Administrator-level reorganizations. Key
components of this process, outlined in EPA's Reinvention Guidance, include:
•	Offices designing a reorganization are to conduct sufficient advance work with
customers and stakeholders — including other Headquarters and Regional Offices
— to resolve any issues or problems with a proposed structure prior to submitting a
proposal for formal review and approval.
•	Once issues are resolved, the reorganizing office prepares and submits a
reorganization proposal to OARM for formal Agency-wide review and comment.
Reorganization proposals are to reflect "analytical rigor," meaning they are to be
thorough and disciplined in assessing the issues and problems related to the current
organizational structure and how the proposed structure addresses those issues or
problems. A proposal with sufficient analytic rigor demonstrates how the continuity
of functions and operations will be maintained, and lays out a smooth transition from
the current structure to the proposed one.
•	OARM distributes the proposal to Headquarters and Regional Offices for an
expedited 10-day "exceptions only comments" review period.
The intention behind allowing the expedited 10-day review process was that if the
advance work was performed that commenting offices would not need more than 10
days to review the proposal and provide comments, if any.
Chapter 5, Other Issues
60

-------
Management Review: Innovative Regional Structures
December 13, 1996
•	After the 10-day review period, the reorganizing office had 5 days to work with
Agency offices in resolving the comments.
•	After being notified that comments have been received, OARM prepared a decision
memorandum for the Administrator or Deputy Administrator to approve or
disapprove the reorganization.
Headquarters program officials expressed unhappinessthat some Regional Offices did not complete
all the agreed-upon front-end analytical work that was expected for the proposals. The front-end
work not completed would have demonstrated, for example, how the Regional Offices would
integrate their new multi-media activities with the traditional national programs.
Headquarters Offices also noted conflicting tensions about their review of reorganization proposals
during FY 1995. Since some Regions did not conduct adequate advance work with Headquarters,
Headquarters officials often saw the basic components of a proposed reorganization for the first time
during the expedited 10-day review period. If the reorganization was complex, many Headquarters
managers and staff felt that they did not have enough time to develop a full understanding of the
proposal. These officials felt they had to review the reorganizations as quickly as possible to meet
the 10-day time frame, and still conduct thorough analyses to identify important issues and potential
problems in proposals they were seeing for the first time. Some Regional managers agree that they
should have done more up-front work with the Headquarters stakeholders in designing their new
organizational structures.
Several senior managers in Headquarters also expressed reservation about the quality of the central
organizational analysis from OARM. In particular, they felt that OARM analysis focused too much
on "small issues" such as organizational and position titling, and missed bigger issues such as a
reorganization's affect on the Agency's regulatory process. OARM managers acknowledged the
limited analysis. They offered a variety of comments about why this happened so that the Agency
could learn for the future. To make the September 30, 1995, deadline for reorganization
implementation, the Regional and Headquarters offices simultaneously submitted a large number
of proposals. The resulting volume of work to be done was too much for the OARM staff charged
with reviewing the plans. Moreover, the group responsible for reviewing the plans experienced
much staff turnover, and the new staff lacked sufficient knowledge of the Agency's organizational
structure, delegations of authority, program expertise, regulatory processes, and relationships with
the States to adequately review the proposals. Further, OARM usually expects the offices across
EPA which are responsible for Agency processes— such as OPPE for regulatory processes and OC
for resource allocation — to look at and comment on issues related to their processes.
REORGANIZATION-RELATED PROBLEM AREAS: The following are areas that seem to
have been overlooked during the reorganization process, but have important repercussions of which
others who reorganize should be aware. Although these areas do continue to present the Regional
Offices with difficulties, they are less unsuccessful aspects of the reorganizations than unanticipated
consequences. Regions and offices reorganizing in the future should factor these issues into their
planning process.
Chapter 5, Other Issues
61

-------
Management Review: Innovative Regional Structures
December 13. 199ft
• Infrastructure: The underestimation of infrastructure support costs represents the
most significant and common problem the Team observed in the reviewed Regions
resulting from the reorganizations. Although some of the underestimation can be
attributed to unanticipated expenses resulting from the Agency's FY 1996 budget
uncertainty and the government shutdown, a larger percentage appeared to result
from the need to physically move many employees more than once, because of
changes required resulting from the speed with which they were forced to move due
to the September 30 deadline. Region VIII, for example, in order to finally place all
staff in their appropriate locations, moved some people three different times.
In Region X the Team heard that the Regional Office had not completely estimated
the costs of establishing their place-based offices by not considering that the cost for
an individual is significantly higher than several employees whose costs can be
amortized, or may qualify for a volume discount (e.g., the Regional Office pays the
same travel costs to the phone company to set up one phone line as they would for
10 phone lines).
Because the Regional Offices needed to move the staff more than once, the
associated costs increased almost exponentially compared to their original budget
estimate which allowed for only one move per employee. With each workstation
move, support functions like phone and computer lines must also be moved - which
costs increase at the same rate as for the physical moves.
One cost most of the Regional Offices did not allow for was the printing updated
Regional telephone directories, with reprints scheduled after each significant shift of
employees. This complaint was heard during our interviews with a number of State
officials but especially those in Region VIII whose large scale reorganizationmoved
more people more times than the other Regions. The absence of an up-to-date phone
directory was commented on a couple of time by States. The officials suggested that
a current phone directory would have gone a long way to alleviating the confusion
arising from who was doing what in the Regional Office. Region I, by comparison,
who completed the other multi-media reorganization, was complimented by at least
one of their State officials who found their issuing an up to date directory very
helpful. It is crucial that Regions and Headquarters offices understand that
significant reorganizations cannot be done cheaply without an increase in disruption
the reorganization will already cause. Not only are these costs very expensive, but
not allowing for them results in substantial indirect costs in the disruption of
relationships with State and Local governments.
Inter-Regional Communications: One unanticipated consequence is the disruption
caused to inter-Regional communications, similar to the disruption caused with
Headquarters and the States, resulting from the Regional structures no longer looking
similar. Much of the Regional program staff is no more certain who their
counterparts are in the other reorganized Regions than are the States. This has
resulted in some unanticipated confusion and downtime as Regional staff with
Chapter 5, Other Issues
62

-------
Management Review: Innovative Regional Structures
December 13, 1996
longstanding professional relationships with their colleagues in other Regions must
re-establish their relationships, as must the Headquarters, State and Local employees.
• Performance Management: Another area of difficulty appears to be lack of
progress in streamlining administrative procedures, such as performance
management. Although all of the Regional Offices reviewed reached the 1:11
staff/supervisory ratio, none were able to streamline the cumbersome procedures
associated with performance management, a critical issue now that supervisors have
wider spans of control. It is worth noting that several Regions were proceeding
with pilot programs to streamline performance management, but EPA's Office of
Human Resources and Organizational Services asked them to put these efforts on
hold because of potential FY 1996 RIFs and pending of the Agency-wide
Performance Management Task Force. Region V was proceeding with two
performance management initiatives considered critical to the success of 1:11:
—	placing staff on a rotating appraisal basis so managers do not face a
block of appraisals at the same time, and
—	changing from the Agency's current appraisal system to a "pass-fail"
assessment.
Neither of these ideas had been implemented at the time of the Review Team's visit,
but both have the supervisors' attention and generally have given them a sense of
optimism about contending with their increased supervisory responsibilities. There
are additional unresolved questions for Regional staffs regarding time and attendance
policies that have become enormously complex as a result of matrix management,
and the vast number of staff shifts and supervisory changes. Some staff anxiety can
potentially be alleviated if the time and attendance issue were settled.
Finally, the Review Team heard an observation which requires no action, but has some merit to
consider in future reorganizations. The Team heard from several sources in Headquarters, the States,
and the Regional Offices that many of the major positive changes made to improve the Regional
Offices' delivery of program services to the States could have been accomplished without
reorganizing. For instance, one State official made this comment in the context of the major
disruption his State's environmental programs experienced as a result of the Regional reorganization.
While he liked an improvement to a specific program, he suggested the improvement could have
been achieved without reorganizing and disrupting his State's programs. This observation was made
by staff in other Regions who were unhappy with the disruption they experienced, as well.
Chapter 5, Other Issues
63

-------
Management Review: Innovative Regional Structures 	 December 13, 1996
Chapter 5, Other Issues
64

-------
Management Review: Innovative Regional Structures
December 13, 1996
CHAPTER 6
CONCLUSIONS AND RECOMMENDATIONS
CONCLUSIONS: GENERAL
The five reorganizations had been in place approximately a year at the time this review was
commenced, each having had an implementation deadline of September 30,1995. During our initial
meetings with most of the Regional and Deputy Regional Administrators, they were clear in voicing
their concerns that this review was premature, since it is an accepted management principle that
reorganizations require several years of experience to demonstrate their results fully. It is the
Review Team's conclusion that the reorganizations studied have each implemented one or more
significant changes from their traditional methods of business, and that in each case more time
should be allowed for them to operate in the new structures before judging whether their innovations
have been successful. Regions I and VIII, for example, each were restructured along multimedia
lines which are very different from Headquarters statutorily-drivenstructures and their own previous
single-media structures. Whether these multi-media designs represent a model for the entire Agency
should be carefully scrutinized, but only after they have had a reasonable opportunity to demonstrate
their advantages and disadvantages.
Once the reorganizations have stabilized, and are ready for a more definitive analysis, a quantifiable
method to evaluate the changes the Regions made will be essential. As noted in the methodology
section of this report, the Review Team collected much of its data by interviewing Regional
managers and staff, and selected State and Tribal officials. The interviews provided essential
information on stakeholder observations, perceptions, and anecdotes. This information, while
invaluable, does not replace more concrete data that also are needed to inform decision-makers about
the effectiveness of these Regional reorganizations in promoting and achieving Agency priorities.
Before any firm conclusions can be drawn, the Agency needs to develop a practical evaluation
process.
We acknowledge that some of the Agency's priorities are difficult to measure, either because they
are qualitative, such as building partnerships, or require years to implement fully and assess impact.
Community-Based Environmental Protection, for example, is an important area of focus in all five
of the reorganizations studied. CBEP has been growing slowly but steadily for a number of years,
but still does not provide much data on any resulting environmental benefits. Similarly, there is not
much information on how well Pollution Prevention, a critical concept in limiting damage to the
environment before it takes place, is being incorporated beyond a handful of "boutique" programs
at the State and local levels. The ReviewTeam believes, however, that a well-thought out evaluation
process should provide data on the success of such programs, as well as assess their weaknesses and
recommend improvements.
Chapter 6, Conclusions and Recommendations
65

-------
Management Review: Innovative Regional Structures
December 13. 19f)K
„	j	the Regions More Time: The Review Team recommends
1' ttaEPA's Semor Leadership Council announce to the Agency it is allowing the
Regional reorganizations an additional 18 months (Janua^ 1997 - June 1998) of
ssssssss^^
SssararrT^ ="cs
Completion Date: January 1997.
7 Recommendation- Develop a Systematic Method to Evaluate Reorganizations;
During the 18-month period that the Regional Offices are gammg additional
operational experience, OARM should convene an Agency-w.de workgroup to
develop an evaluation process for assessing the success of reorganizafons that
includes both quantifiable and qualitative data. The final evaluation process should
have Agency-wide consensus. Suggested Lead, OARM Suggested Completion
Date-. June 1998.
i Recommendation - Conduct an Analogous Preliminary Assessment of
Headauarters Office Reorganizations. The Team recommends that OARM lead
a review of the reorganizations which took place in Headquarters during FY 1995
similar to this Innovative Regional Structures Review, to identify lessons learned
about what works and what does not Suggested Lead: OARM. Suggested
Completion Date for the Preliminary Assessment. July 31,1997.
a Recommendation - Conduct a Follow-up Evaluation to this Review and the
Headquarters Review at the End of the 18 Months. At the conclusion of the 18-
month period for the Regions to gain operational experience (June 1998), the Team
recommends that OARM lead a follow-up evaluation both to this Innovative
Regional Structures Review and the Headquarters review suggested in
Recommendation 3 above, using the systematic evaluation process (see
Recommendation 2 above) agreed to by the Agency. The follow-up study should
have an Aeencv-wide perspective and include all Headquarters and Regional Offices.
Suggested Lead: OARM. Suggested Completion Date: December 30, 1998.
CONCLUSIONS: INNOVATIONS HOLDING THE MOST PROMISE FOR
THE FUTURE WORK OF EPA
Because the Regional reorganizations have been in place only a short time, the Team does not
believe that enough time has elapsed to make a complete and fair assessment about what innovations
hold the most promise for other Agency offices. Nevertheless, the Team concludes that a number
of promising concepts and constructs implemented by the Regional Offices bear watching and
recommend that these be considered in future studies of the Regional reorganizations.
Chapter 6, Conclusions and Recommendations
66

-------
Management Review: Innovative Regional Structures
December 13, 1996
•	REGION X's DEFINITION OF CORE PROCESSES: The Team was impressed
that before reorganizing, Region X examined the work it performs and identified six
core processes around which to design its organizational structure:
—	Direct Program Delivery;
—	Ensuring Compliance with Environmental Laws;
—	Assessment of the Condition of the Environment;
—	Outreach and Environmental Information Exchange;
—	Partnership and Capacity Building;
—	Innovative Environmental Protection Strategies.
After testing these core processes with external customers, the Region added a
seventh core process—Resource Focusing—to prioritize work in light of declining
resources. Based on these core processes, the Region decided to retain its media-
based program offices, but supplement them with cross-media divisions in response
to the Agency's reinvention and strategic goals. We found the Region Office's
overall approach to redesigning its organization to be logical and objective, and are
interested to see whether this organizational structure proves to be more effective in
achieving its intended results than those designed with less rigor.
•	PLACE-BASED INDIVIDUALS. In its reorganization, not only did Region X
reaffirm the need for its four State Operations Offices (Alaska, Idaho, Oregon, and
Washington), but it physically placed more Regional staff in communities that need
hands-on assistance with their environmental protection efforts. These features are
not new as a result of the reorganization, but reporting relationships were changed
to ensure more direct supervision by program managers in the main Region X office
in Seattle, WA. The Region notes that establishing these community-based offices
is very expensive because of the additional expenses for rent, furniture, equipment,
and other infrastructure necessities. However, the Team believes they may be worth
the investment, particularly given the limited amount of travel dollars and the large
geographic distances between the Regional Office and the states on the west coast.
•	ECOSYSTEMS OFFICES: Three Regions created central units to manage and
coordinate multi-media and geographic work, such as CBEP:
—	Region I' s Office of Ecosystems Protection,
—	Region VIII's Office of Ecosystems Protection and Remediation,
—	Region X's Office of Ecosystems and Communities.
Whether the rest of the Region Office remained single media (Region X) or moved
to a multi-media structure (Regions I and VIII), establishment of these ecosystems
offices has resulted in dedicated resources to Agency priorities that may not have
received much support otherwise. If these offices live up to their potential, other
Agency offices may want to consider forming such an organization.
Chapter 6, Conclusions and Recommendations
67

-------
Management Review: Innovative Regional Structures
December 13, 1996
•	REGIONAL TEAMS: Region V chose to keep its single-media structure in place,
but overlay a team structure to address strategic priorities, such as ecosystem
protection and pollution prevention. The leaders of these teams, Regional Team
Managers, are nonsupervisory and report to the Region's Senior Leadership Team
(SLT). Each Regional Team does have a "sponsor" on the SLT. Region V's team
approach for addressing strategic priorities is quite different than that of other
Regions which established formal organizational units (Regions I, VIII, and X). This
team approach will require the Region Office to become more adept at matrix
management. If successfully implemented, the teams could work in tandem with the
Region's single media offices to provide a wide range of environmental services. If
these teams live up to their potential, they will serve as an alternative approach for
those offices that want to pursue cross-media work without a dramatic organizational
change.
•	"ASSIGNMENTS, NOT POSITIONS" CONCEPT: Region X, recognizing the
reduced opportunities for advancement into managerial positions has developed a
rotational assignment concept. A key point of this concept is that managers do not
"own" jobs anymore, and that managers and staff rotate through a variety of
experiences throughout the years. For example, while one may have supervisory
responsibilities at present, in the future the person may rotate to a non-supervisory
assignment. The Team believes this is an intriguing concept that warrants future
evaluation to determine its applicability to the rest of EPA. Key considerations
include:
—	Development of non-supervisory assignments that are appropriate for
senior staff (grades 13, 14, and 15) and can be rotated without great
loss of efficiency and effectiveness.
—	Customer receptivity to routine changes in Regional contact points
and networks.
This last point is particularly important because some Headquarters and State
customers found the Regions' recent personnel changes confusing and Regional
responsiveness diminished, and are irritated at having to orient Regional managers
and staff who are new to their programs.
•	RESOURCE FOCUSING: Region X hopes to try out its "resource focusing" effort
during FY 1997. Resource focusing attempts to answer questions as: determining
whether the Agency should take on specific projects, where to route them, and what
our role should be in these projects. In making such decisions, reliance will be
placed on such factors as risk analysis, resource considerations, and EPA's value-
added role. The Team believes this concept is promising and deserves watching to
see how it works.
Chapter 6, Conclusions and Recommendations
68

-------
Management Review: Innovative Regional Structures
December 13, 1996
CONCLUSIONS: LESSONS LEARNED
In addition to a number of promising concepts and constructs implemented by the Regional Offices
that bear watching, the Team concludes that there were a number of lessons learned from the FY95
reorganizations that should be considered when planning and implementing future Agency changes
and reorganizations.
•	EPA STATE-BASED OFFICES: States reacted enthusiastically to the creation, or
the continuation, of focused, fully-authorized State-based offices. Region X
maintained good, comprehensive communications with the States by retaining their
State Operations Offices located in the State capitals. Region I located its State
offices in Boston, MA, but gave them full authority. In both cases, having dedicated
State offices helped minimize the disruption to the States during the reorganization
transition.
•	ENFORCEMENT AND COMPLIANCE ASSURANCE: There remains a high
level of inconsistency among the Regions, both in terms of how each balances
enforcement and compliance assurance efforts and the perceptions of Regional staff
about what levels of effort are appropriate. There are also grave concerns about how
to integrate and update data systems to allow tracking of multi-media and compliance
assurance activities.
5.	Recommendation - Assess Differences in Balancing Enforcement
and Compliance Assurance: The Team recommends OECA
analyze the differences among the Regions in their balancing of
enforcement and compliance assurance activities and continue its
efforts to communicate the relative priority and appropriate use of all
enforcement and compliance assurance tools. Suggested Lead:
OECA; Suggested Completion Date: June 30, 1997.
6.	Recommendation - Improve Tracking Systems: The Team
recommends OECA in concert with the OCFO lead an Agency-wide
effort to improve systems for tracking and crediting multi-media
activities, EJ efforts, compliance assurance activities, their related
environmental results, and sector-based approaches. These systems
need to start with clear definitions of terms and break out of the
media-specific focus on the "legacy systems." Suggested Lead:
OECA; Suggested Completion Date: September 30,2000.
•	1:11 SUPERVISOR-TO-STAFF RATIO: All of the Regions acknowledged that
the 1:11 supervisor-to-staff ratio was a major driver in leading them to reorganize.
To achieve a Region-wide 1:11 ratio, most first-level supervisors are managing more
than 11 employees, in many cases 20-30, in order to accommodate smaller immediate
office staffs. The 1:11 ratio does not factor in the non-Federal staff managed by
supervisors, such as contract staff and Senior Environmental Employees Program
Chapter 6, Conclusions and Recommendations
69

-------
Management Review: Innovative Regional Structures
December 13, 1996
(SEEP) participants. The Agency may not be well-served by such a large span of
control, given the technical nature of our work and the need for program
accountability.
7.	Recommendation - Study the Effect of the 1:11 Supervisor to
Staff Ratio: Broadly assess the impact going to 1:11 has had on the
Agency, considering how to either make it more likely to work or
provide more flexibility in its application. This study should factor
in non-Federal staff managed by supervisors, such as SEEP
participants. Suggested Lead. OARM; Suggested Completion Date.
April 30, 1997.
•	MOVEMENT OF MANAGERS AND STAFF: In deciding to move many
managers and staff to new positions and programs, the Regions were not simply
trying to reduce the number of managers to reach the 1:11 supervisor-to-staff ratio.
They also were trying to foster cross-program knowledge and better support multi-
media activities. This movement of managers and staff was disruptive to program
delivery and customer service, partially due to the budget uncertainty of FY 1995.
8.	Recommendation - Assess Cross-Media Expertise via Movement
of Managers and Staff: The Review Team recommends that OARM
conduct a review of cross-program experience within the ranks of
EPA management to determine to what extent tangible benefits can
be identified, and at what cost. Based on the benefits and costs
identified, the review should also look at how frequent and to what
extent the movement of managers from program to program should
be encouraged within the Agency. This assessment should factor in
Region X's "Assignment, Not Positions" concept for rotating
managers and staff every few years. Suggested Lead: OARM;
Suggested Completion Date: December 31,1997.
•	MANAGEMENT ROLES AND BEHAVIORS: The Agency's avowed new role
for managers and supervisors, especially with its goal of a 1:11 supervisor-to-staff
ratio, is one of primarily coaching, mentoring, and empowering staff to handle
technical issues and resolve problems. While this approach is appealing, the Team
heard frustration from managers and staff regarding its practicality at EPA. Given
the variety and public nature of the issues EPA deals with, managers are expected by
internal and external stakeholders to attend to the resolution of environmental issues.
Therefore, they are finding it difficult to focus solely on coaching and mentoring
responsibilities.
9.	Recommendation - Find the Right Balance in Redefining
Management Roles and Behaviors: The Review Team
recommends that OARM expand on the management behavior
guidelines in EPA's Reinvention Guidance to address finding the
Chapter 6 Conclusions and Recommendations
70

-------
Management Review: Innovative Regional Structures
December 13, 1996
right balance between coaching/mentoring and more technical roles.
Suggested Lead: OARM. Suggested Completion Date: April 30,
1997.
•	TEAMS: As EPA moves towards becoming a more team-based organization, the
Review Team has several recommendations to encourage and support that effort.
10.	Recommendation - Support the TeamEPA Project. The
TeamEPA serves as a way to develop an Agency-wide framework for
implementing teams that local organizations can customize for their
unique organizational needs. The Review Team recommends that
OARM provide necessary resources for implementing the
recommended national program activities; assess the extent of matrix
management operations across the Agency; and implement necessary
activities and training to build this capacity. The Team also
recommends that OARM quickly implement PERFORM (the new
performance management system) at EPA. Suggested Lead: OARM;
Suggested Completion Date: April 30,1997
11.	Recommendation - Dedicate Resources and Strong Support for
the Processes, Training and Structures Needed to Build Regional
Capacity in Working in Teams. This includes developing local
programs to implement TeamEPA recommendations, clarifying and
distinguishing the interrelated roles and expectations of supervisor
and team leader, and building internal expertise to assist teams in
successfully achieving their goals. Suggested Lead: Regional
Administrators; Suggested Completion Date: September 30, 1997
•	DIFFERENT HQ AND REGIONAL PERSPECTIVES AND PRIORITIES:
Differences still exist between Headquarters and Regional Offices related to Regional
desire and need for autonomy and flexibility in responding to local environmental
needs, and Headquarters' desire and need for the Regions to be held accountable for
resources and national environmental program delivery. These differences likely
were exacerbated during the FY 1995 reorganizations of both Headquarters and
Regional Offices.
12.	Recommendation - Clarify Goals for Agency Initiatives: The
Review Team recommends that EPA senior leaders develop
Agency-wide agreement on goals/objectives for Community-Based
Environmental Protection, Pollution Prevention, Environmental
Justice, and other Agency initiatives, and define "measures of
success" for tracking progress. The Senior Leadership Council
should sponsor this exercise, and require the National Program
Managers staffing Agency initiatives to lead development of the
goals/objectives and success measures for their respective initiatives.
Chapter 6, Conclusions and Recommendations
71

-------
Management Review: Innovative Regional Structures
December 13, 1996
Suggested Leads. SLC (NPMs with lead for these individual
initiatives would staff the SLC); Suggested Completion Date: Before
FY98 round of MOAs.
13.	Recommendation - Annually Evaluate Regional Performance
under the MO A Process, and later the Agency's
Planning/Budget/Accountability System: If Regions are not
meeting their commitments, determine what the causes are and
whether there is any discernable connection between delivering on
commitments and their organizational structures. Suggested Lead:
Office of the Chief Financial Office (Agency lead with involvement
from NPMs and Regions); Suggested Completion Date: December
30, Annually.
14.	Recommendation - Better Coordinate the Agency's MO A
Process: In establishing the Agency's planning, budgeting and
accountability system, bring the different NPMs' MOA process onto
the same time schedule. Suggested Lead: OCFO; Suggested
Completion Date: June 30, 1997.
15.	Recommendation - Assess Small Programs in the Regions: Using
performance measures, evaluate whether small programs — such as
pesticides, toxics, UST, oil spills — have lost program effectiveness
and/or efficiency as a result of the Regional reorganizations.
Suggested Leads: OPPTS/OSWER/OAR; Suggested Completion
Date: June 30,1997.
• DESIGNING, REVIEWING AND APPROVING REORGANIZATION
PROPOSALS. Several Headquarters officials believe they were not adequately
involved during the design of the new Regional structures. A number of
Headquarters managers and staff also commented that the procedure for reviewing
and approving reorganization proposals is flawed and should be revised.
16.	Recommendation - Strengthen EPA's Clearance Process for
Reorganizations: The Review Team recommends that OARM, in
consultation with Headquarters and Regional managers and staff,
assess the effectiveness of EPA's processes and procedures for
designing, reviewing, and approving reorganization processes.
Suggested Lead: OARM; Suggested Completion Date: June 30,
1997.
OTHER ADVICE AND COMMENTS
napter 6, Conclusions and Recommendations
72

-------
Management Review: Innovative Regional Structures
December 13, 1996
The following comments did not fit easily into the Innovations and Lessons Learned sections of this
report, but are still worth noting.
•	PLANNING, BUDGETING, AND ACCOUNTABILITY FUNCTIONS.
Regions I and V split up their planning and resource management functions in their
reorganizations, while Regions VII, VIII, and X kept these functions together. The
Team urges the soon-to-be formed OCFO and Regions, regardless of structure, to
watch these functions carefully during the next 18 months to ensure that integration
of the functions occurs.
•	TARGET EPA EFFORTS AND RESOURCES BETTER. The Review Team
heard from several Regional employees and external stakeholders that the Agency
has too many initiatives. They believe EPA would be better off if it focused its
efforts on three or four areas, rather than trying to do something everywhere. The
inability to disinvest from some activities in order to concentrate on more value-
added activities was mentioned as a problem in all five Regions visited. As one
individual characterized it, "EPA is a mile wide and an inch deep." A contributing
factor could be that EPA must continue its base programs because of statutory
requirements, while also pursuing other activities that it believes help it better protect
the environment. Whatever the case, some Regional employees and State and
industry stakeholders suggested that EPA needs to target its efforts and resources
better toward areas where it can add the most value, and disinvest from those
activities that are not highly value-added.
Chapter 6, Conclusions and Recommendations
73

-------
Management Review: Innovative Regional Structures
December 13, 1996
Chapter 6, Conclusions and Recommendations
74

-------
Management Review: Innovative Regional Structures
December 13, 1996
APPENDICES
l SUMMARY OF RECOMMENDATIONS
2 REGION-SPECIFIC OBSERVATIONS
The following appendices summarize the observations of
the Review Team's on-site visits to the Regional Offices.
2a
Region VIII
Denver, CO
2b
Region VII
Kansas City, KS
2c
Region X
Seattle, WA
2d
Region V
Chicago, IL
2e
Region I
Boston, MA
3 CONCERNS AND OBSERVATIONS OF
HEADQUARTERS OFFICES
This appendix summarizes the Team's interviews with
managers and staff from the following Headquarters
offices: OAR, OARM, Office of the Chief Financial
Officer, OECA, OGC, OPPE, OPPTS, OROSLR,
OSWER, and OW.
4 GLOSSARY OF TERMS
Appendices
75

-------
Management Review: Innovative Regional Structures		December 13, 1996
Appendices	^

-------
Management Review: Innovative Regional Structures
December 13, 1996
APPENDIX 1
SUMMARY OF RECOMMENDATIONS
RECOMMENDATIONS:
RECOMMENDATION
SUGGESTED LEAD
SUGGESTED
COMPLETION DATE
1. Give the Regions More Time: Senior Leadership
Council should announce to the Agency it is allowing the
Regional reorganizations an additional 18 months
(January 1997 - June 1998) of operational experience in
order to determine whether or not they produce longer-
term benefits in delivering public health and
environmental protection.
Senior Leadership
Council
January 1997
2. Develop a Systematic Method to Evaluate
Reorganizations: During 18-month period that the
Regions are gaining additional operational experience,
OARM should convene an Agency-wide workgroup to
develop a process for assessing the success of
reorganizations that includes both quantifiable and
qualitative data. The final evaluation process should
have Agency-wide consensus.
OARM
June 1998
3. Conduct an Analogous Preliminary Assessment of
Headquarters Office Reorganizations. OARM should
lead a review of the reorganizations which took place in
Headquarters during FY 1995, similar to this Innovative
Regional Structures Review, to identify lessons learned
about what works and what does not.
OARM
July 31,1997
4. Conduct a Follow-up Evaluation to this Review and
the Headquarters Review at the End of the 18
Months. In June 1998, OARM initiate/lead a follow-up
evaluation both to this Review and the HQ review
suggested in Recommendation 3 above, using the
systematic evaluation process (see Recommendation 2
above) agreed to by the Agency. The follow-up study
should have an Agency-wide perspective and include all
Headquarters and Regional Offices.
OARM
December 31,1998
5. Assess Differences in Balancing Enforcement and
Compliance Assurance: OECA should analyze the
differences among Regions in their balancing of
enforcement and compliance assurance activities and
continue its efforts to communicate the relative priority
and appropriate use of all enforcement and compliance
assurance tools.
OECA
June 31,1997
Appendix 1: Summary of Recommendations
77

-------
Management Review: Innovative Regional Structures
December 13, 1996
RECOMMENDATION
SUGGESTED LEAD
SUGGESTED
COMPLETION DATE
6. Improve Tracking Systems: OECA in concert with the
OCFO should lead an Agency-wide effort to improve
systems for tracking and crediting multi-media activities,
EJ efforts, compliance assurance activities, their related
environmental results, and sector-based approaches.
These systems need to start with clear definitions of
terms and break out of the media-specific focus on the
"legacy systems."
OECA
September 30, 2000
7. Study the Effect of the 1:11 Supervisorto Staff Ratio:
OARM should broadly assess the impact going to 1:11
has had on EPA, considering how to either make it more
likely to work or provide more flexibility in its application.
This study should factor in non-Federal staff managed
by supervisors.
OARM
April 30,1997
8. Assess Cross-Media Expertise via Movement of
Managers and Staff: OARM should conduct a review of
cross-program experience within the ranks of EPA
management to determine to what extent tangible
benefits can be identified, and at what cost. Based on
the benefits and costs identified, the review should also
look at how frequent and to what extent the movement
of managers from program to program should be
encouraged within the Agency. This assessment should
factor in Region X's "Assignment, Not Positions" concept
for rotating managers and staff every few year.
OARM
December 31,1997
9. Find the Right Balance in Redefining Management'
Roles and Behaviors: OARM should expand on the
management behavior guidelines in EPA's Reinvention
Guidance to address finding the right balance between
coaching/mentoring and more technical roles.
OARM
April 30, 1997
10. Support the TeamEPA Project. OARM should provide
necessary resources to implement the recommended
national program activities; assess the extent of matrix
management operations across EPA; and implement
necessary activities and training to build this capacity.
The Team also recommends that OARM quickly
implement PERFORM (the new performance
management system) at EPA.
OARM
April 30, 1997
11. Dedicate Resources and Strong Support for
Processes, Training and Structures Needed to Build
Regional Capacity in Working in Teams. This
includes developing local programs to implement
TeamEPA recommendations, clarifying and
distinguishing interrelated roles and expectations of
supervisors and team leaders, and building expertise to
assist teams in successfully achieving goals.
Regional
Administrators
September 30,1997
Appendix 1: Summary of Recommendations
78

-------
Management Review: Innovative Regional Structures
December 13, 1996
RECOMMENDATION
SUGGESTED LEAD
SUGGESTED
COMPLETION DATE
12. Clarify Goals for Agency Initiatives: EPA senior
leaders should develop Agency-wide agreement on
goals/objectives for Community-Based Environmental
Protection, Pollution Prevention, Environmental Justice,
and other Agency initiatives, and define "measures of
success" for tracking progress. The SLC should
sponsor this exercise, and require the NPMs staffing the
initiatives to lead development of the goals/objectives
and success measures for their respective initiatives.
SLC (NPMs with lead
for these individual
initiatives would staff
the SLC)
Before FY98 round of
MOAs.
13. Annually Evaluate Regional Performance under the
MOA Process, and later EPA's Planning, Budget,
and Accountability System: If Regions are not
meeting their commitments, determine the causes and
whether there is connection between delivering on
commitments and their organizational structures.
Office of the Chief
Financial Officer
(Agency lead with
involvement from NPMs
and Regions)
December 30,
Annually.
14. Better Coordinate EPA's MOA Process: In
establishing EPA's planning, budgeting and
accountability system, OCFO should bring the different
NPMs' MOA process onto the same time schedule.
Office of the Chief
Financial Officer
June 30,1997
15. Assess Small Programs in the Regions. Using
performance measures, evaluate whether small
programs — such as pesticides,toxics, UST, oil spills—
have lost program effectiveness and/or efficiency as a
result of the Regional reorganizations.
OPPTS/OSWER/OAR
June 30,1997.
16. Strengthen EPA's Clearance Process for
Reorganizations: OARM, in consultation with
Headquarters and Regional managers and staff, assess
the effectiveness of EPA's processes and procedures
for designing, reviewing, and approving reorganization
processes.
OARM
June 30,1997
Appendix 1: Summary of Recommendations
79

-------
Management Review: Innovative Regional Structures
December 13, 1996
Appendix 1: Summary of Recommendations
80

-------
Management Review: Innovative Regional Structures
December 13, 1996
APPENDIX 2
REGION-SPECIFIC OBSERVATIONS
The following Appendices summarize the observations of the Review Team's on-site visits to the
Regional Offices. The Appendices are in the order that they were visited by the Review Team.
Appendix 2a	Region VIII, Denver, CO
Appendix 2b	Region VII, Kansas City, KS
Appendix 2c	Region X, Seattle, WA
Appendix 2d	Region V, Chicago, IL
Appendix 2e	Region I, Boston, MA
Appendix 2: Region-Specific Observations
81

-------
Management Review: Innovative Regional Structures
December 13, 1996
Appendix 2: Region-Specific Observations
82

-------
Management Review: Innovative Regional Structures
December 13, 1996
APPENDIX 2a
Region VIII, Denver, CO
REGION-SPECIFIC OBSERVATIONS
Site Visit: August 12-13,1996
Organizational Structure Prior to October 1,1995
Current Organizational Structure
Appendix 2a: Region-Specific Observations: Region VIII, Denver, CO
83

-------
Management Review: Innovative Regional Structures		December 13, 1996
BRIEF DESCRIPTION OF THE REORGANIZATION, and STATED
INTENTIONS AND DRIVERS
In approaching reinvention and reorganization, Region VIII sought to evolve towards new
approaches to ecosystem protection and pollution prevention, as well as toward new partnerships
with States, Tribes, the regulatory community and the public. The following were identified as the
driving forces for change.
•	The new strategic vision embodied in EPA's Five Year Strategic Plan and its seven
guiding principles: ecosystem protection; environmental justice; pollution
prevention; strong science and data; partnerships; reinventing EPA management; and
environmental accountability.
•	Stakeholder involvement in decision-making - customer focus and communication.
•	The National Performance Review and resultant Executive Orders (e.g., establishing
a 1:11 supervisor to staff ratio).
•	The Administrator's decision to allow a choice between three options to reorganize
enforcement.
The following major changes are characteristic of this change in focus from current environmental
programs to future ecosystem and community based challenges.
•	Moving from a solely statutory organizational structure to a functional and strategic
principle structure in alignment with the agency's Five Year Strategic Plan.
•	Creating an organization that will more effectively establish partnerships with States,
Tribes and local communities.
•	Implementing the Regional component of the OEC A reorganizationby consolidating
enforcement and compliance programs into a central point of accountability to
provide one voice and one focus. This includes providing a point of accountability
for environmental justice.
The new organization comprises the following major offices.
•	Communications & Public Involvement
•	Pollution Prevention, State and Tribal Assistance - includes Air, Water, RCRA,
Pesticides Toxics, P2 assistance and State and Tribal Assistance
•	Ecosystems Protection and Remediation - includes all of Superfund, Federal
Facilities and Ecosystem Protection and parts of the old Water Division
Appendix 2a: Region-SpecificoSse^tions: Region VIII, Denver, CO
84

-------
Management Review: Innovative Regional Structures
December 13, 1996
•	Enforcement, Compliance and Environmental Justice - implements Option 3
•	Regional Counsel - counseling services
•	Technical & Management Services - includes OARM and OPPE functions plus
laboratory and quality assurance
STRATEGIC PRIORITIES
This section focuses on how well the reorganizationhas positioned Region VIII to achieve
the Agency's strategic priorities: Community-Based Environmental Protection;
Pollution Prevention; Partnerships; Enforcement, Compliance, and Counseling; and
Environmental Justice.
COMMUNITY-BASED ENVIRONMENTAL PROTECTION (CBEP): As part of its
reorganization, Region VIII gave CBEP an institutional home (the Ecosystem Protection Program,
in the Ecosystems Protection and Remediation Office), resources, and an advocate for geographically
targeted, cooperative approaches. There was general agreement within the Regional Office that
CBEP would not happen otherwise. Everyone had too much else to do before the reorganization.
The Regional Office has devoted 20% of its resources to CBEP and has written letters to the States
telling them they can do the same. Fifty-five geographic and sector teams have been established and
are developing working relationships and work plans for advancing CBEP in the Regional Office.
The Regional Office is trying to prioritize projects based on ecosystem resources and threats and has
developed factors for prioritizing projects. The factors they use in evaluating projects include
environmental/public health risks, whether EPA involvement/assistance is wanted, where the
Regional Office can be most effective as a partner, and potential socio-economic impact. The
Regional Office is involving other Federal agencies and State and local agencies, including County
Health Departments in the projects. Some in the Regional Office noted that CBEP revises the
perception that EPA is the "black hat" and has led to more effective coordination with these agencies
efforts. Relationships are much less adversarial and agencies with overlapping missions should be
able to marshall/coordinateresourcesmore efficiently/effectively. Team members have performance
standards incorporating common elements for success of the CBEP projects.
While CBEP has a home, an advocate, increased resources, and numerous projects underway in
Region VIII, some of the concerns raised in the Regional Office indicate that it is too soon to judge
the ultimate success of the Program. Everyone is still trying to determine their roles and
responsibilities. Staff in the Ecosystem Protection Program still need to coordinate or work in teams
with the media programs. They noted that it is difficult to get program staff to come to the table.
Program office staff noted that when the Regional Office increased the priority for CBEP and
pollution prevention, they did not anticipate the burden on the basic programs. The program offices
Appendix 2a: Region-Specific Observations: Region VIII, Denver, CO
85

-------
Management Review: Innovative Regional Structures
December 13, 1996
have shrunk but their traditional work has not gone away. The Regional Office has found it hard to
determine measures of success. While it has developed some measures, it does not have baseline
data for them. Team members have common performance standards, but managers are evaluating
staffs differently. Team start-up has proven to be expensive and some teams are more self-directed
than others. It was reported that numerous teams report to a single person, even though some teams
are led by staff from other offices and that the large span of control makes it difficult for the manager
to keep up. The Regional Office is still trying to identify its CBEP counterparts in other Regions
with whom to coordinate. Finally, the Regional Office noted that travel dollars may be a problem
and that it is going to need to bring "seed" money to the table to make CBEP work.
POLLUTION PREVENTION: The reorganization also gave Pollution Prevention (P2) priority
and an institutional home (the Pollution Prevention Program, in the Pollution Prevention, State and
Tribal Assistance Office). The reorganization gave P2 visibility, support, and resources.
While the reorganization gave P2 a home, some staff believe there is a duplication of P2 efforts
among the P2 Program, CBEP and the media programs. The Region is still sorting out the P2
responsibilities. P2 staff feel that they are held accountable for the program where they do not
directly control it and must depend on the media programs for P2 results. Multiple program offices
are reporting on P2 activities and coordination with Headquarters and the States has initially been
more difficult. To help address this problem, OPPTS asked the Regional Office to identify a single
point of contact for them to work with and the Region has negotiated a P2 MO A with OPPTS to help
address the issue.
PARTNERSHIPS: Region VIII set up a State Assistance Program and a Tribal Assistance Program
as part of the Pollution Prevention, State, and Tribal Assistance Office to help coordinate and
strengthen Regional partnerships with the States and Tribes. (The Region considered establishing
more State Offices like Regions I and X did, and similar to their own Montana Office, but decided
not to.) The Tribal Assistance Program has concentrated Tribal assistance in one office and
resources have been clearly designated for Tribal activities; Tribal resources have been increased.
The Tribes seemed pleased with the Region's increased presence, commitment, and advocacy and
that the Regional Office was beginning to implement the Indian Policy. They noted that the
Regional Office was moving in the right direction. States and Tribes like having a single point of
contact in the Regional Office. State representatives interviewed generally gave high marks to the
Regional Office for keeping them informed of what was going on and soliciting ideas regarding the
reorganization. State representatives generally thought PPGs offered a lot of promise, particularly
if they include more EPA responsibilitiesand if EPA is willing to invest and disinvest in programs
that work and do not work, respectively. States thought PPGs couldn't have been coordinated as
efficiently without the reorganization.
Generally States felt the significant amount of movement of staff, managers, and responsibilities
made State and Regional contacts and working relationships more difficult. They indicated that it
is hard to know who to call even with the organizational chart; staff kept moving and phone numbers
kept changing. It takes time to meet new people. Some State representatives were concerned the
Regional Office was focused inward trying to resolve its own problems. One State Director noted
Appendix 2a: Region-Specific Observations: Region VIII, Denver, CO
86

-------
Management Review: Innovative Regional Structures
December 13, 1996
that Regional staff are still trying to find their own way and appear more process than results
oriented.
It was reported that State Directors have expressed concern about having to work with GS-15's when
they have been used to dealing with SESers. Several State representatives noted that staff appear
either tentative or unable to make decisions, probably because so many of them are new to their
positions. Some staff were seen as more responsive/enthusiasticthan others; some were recognized
as good at coordinating PPGs but less effective on single media problems. One State representative
noted, however, the State could still count on a quick resolution and response to issues by Senior
Managers. State Directors end up calling the RA and DRA when they do not know who to deal with
and seem to elevate issues to the RA quickly. The Region reports that it and its counterparts are
settling in and becoming accustomed to each other.
Some State representatives expressed frustration with the reorganization veering from the original
media structure that's reflected in State and Headquarters organizations and the environmental
statutes. They noted that the reorganization was not likely to succeed without a similar Headquarters
reorganization. One State representative noted that his State was much in need of traditional hands-
on technical assistance (e.g., air and water permitting and modeling assistance) and fewer new
initiatives and another noted the need for training regarding the new Drinking Water Program.
Another State representative expressed concern about the Enforcement Division and two
representatives felt the Enforcement Division was too focused on enforcement and not enough on
compliance assistance. One State representative felt that a previously good, supportive Regional
FIFRA program had been dismantled. The State used to have one Regional contact to deal with
regarding FIFRA and now they have five or six; new FIFRA contacts need training. Some Tribal
representatives noted that there does not seem to be a clear chain of command between the Montana
and Denver offices (e.g., regarding some big NPDES issues) and others noted that program officers
and grant officers do not seem to known what the other is doing.
Tribal responses varied regarding the degree to which they were involved in the reorganization. Two
Tribal representatives noted they were informed what the Regional Office was going to do, but that
they were not really involved. They indicated they would like to be involved more in what remains
to be done. Tribal representativesnoted that knowing who to contact had been a problem during and
right after the reorganization and phone numbers kept changing, but that things were getting better
and responsiveness had improved.
ENFORCEMENT, COMPLIANCE, AND COUNSELING: Consolidation of enforcement
activities was one of the fundamental objectives of the reorganization. The Regional Office
separated enforcement and counseling, however. In the prior organization, there was poor
consultation and there were different enforcement policies for different statutes. Five options were
considered for how to organize the seventy people in the newly-consolidatedTechnical Enforcement
Program. Ultimately, it was left up to the new enforcement organization to decide how to organize
itself. The office decided to continue media groups to help with Headquarters communications and
to create cross-media sector and State teams to support State activities. Each case officer handles
both compliance assurance and enforcement.
Appendix 2a: Region-Specific Observations: Region VIII, Denver, CO
87

-------
Management Review: Innovative Regional Structures
December 13, 1996
The separation of counseling and enforcement functions has provided a clarification of roles for both
the enforcement and the counseling attorneys, which the Regional Office views as advantageous to
the program clients. The Regional Counsel staff, who originally resisted losing enforcement
responsibility, now seem to be happy with counseling and overall professional opportunities.
Enforcement attorneys are now able to work across media lines. While most enforcement attorneys
are developing multi-media capacity, there are still senior enforcement attorneys who are experts in
particular areas (e.g., media programs, mining, and multi-media).
The enforcement staff recognize the need to work harder to coordinate and acknowledge the need
for the Regional Office to speak with one voice. They also noted that about half of the technical
enforcement staff have new or modified jobs. The separation of enforcement and program staff has
created file system problems too. The consolidation of enforcement has made delegated program
issues more difficult and evident. States are willing to do compliance assurance, but they are not
committed to enforcement, thus making frequent interaction with the States more important.
Enforcement and Counseling staff were concerned that OECA has not made the administrative
adjustments necessary to accommodate and support the Regional reorganization. Particularly, there
is no Headquarters system to track multi-media activities. Headquarters still wants media specific
data. The Regional Office thinks Headquarters needs to adapt and that AAs' goals must include non-
media specific objectives. Even OECA remains media-specific. The Regional Office also thinks
there is a need to define the terms "multi-media,""sector," and "environmental justice" and to start
crediting activities in these areas. Like other offices, the Office of Regional Counsel did not get the
resources it was promised during the reorganization. The Regional Counsel and the Chief Legal
Enforcement Counsel are working to identify counseling matters in enforcement matters and vice-
versa.
REINVENTION PRIORITIES
This sectionfocuses on how well the reorganization has positioned Region VIIIto achieve
the Agency's reinvention goals: Shared Vistouand Values; Customer Focus; Diversity;
Working Collaboratively; and Streamlined and Strengthened Organizational Design.
Region VIII has made progress, at differing rates and to differing extent on all of these reinvention
priorities In most respects it is just too soon to tell how well things will ultimately turn out. Since
many of these priorities have significant "cultural" components, a two or three year horizon may be
more appropriate.
Based on the first year's experience, change has been as hard or harder than anticipated in many
cases. As with many attempts at major cultural and organizational change, Region VIII has
Appendix 2a: Region-Specific Observations: Region VIII, Denver, CO
88

-------
Management Review: Innovative Regional Structures
December 13, 1996
discovered numerous, previously uncharted, bumps in the road. The good news is that they are
moving in the right direction and are responding to problems as they present themselves.
PROCESS FOR REORGANIZING: The reorganization was led by the Regional Administrator
and the Region's Senior Leadership Team (SLT), composed of the Region's six SESers. Current
senior management noted that a dramatic change like that undertaken by the Regional Office requires
a strong political leader to be successful. The RA initiated the reorganization planning by putting
out an open call to all staff for design proposals and held a town meeting where anyone could present
proposals to the RA and members of the SLT. The SLT met off site in Peaceful Valley, where they
developed a hybrid design from the proposals staff had presented.
The SLT then established a Design Team, composed of a representative from each of the Region's
divisions to fill in the details of the design. Each Division Director selected the representative from
his/her division. The Design Team was composed of both staff and managers. The Regional Office
set aside a room called "The Think Tank" where all reorganization materials were posted for staff
to review. "The Think Tank" contained a comment/suggestion box for staff feedback and ideas.
Management indicated that hundreds of e-mail messages were sent to staff regarding reorganization
activities and the DRA had regular listening sessions where any employee could express concerns
about the development of the reorganization. Senior management noted that they involved the
Union every step of the way but had not involved the Assistant Administrators enough. The RA and
DRA provided Headquarters Offices a broad overview of the Region's reorganization proposal in
Senior Leadership Council meetings before decisions were made. Program Office Directors were
not uniformly consulted, however, until after the decisions were made.
As part of the placement process the Regional Office surveyed every employee to determine the
percent of their time spent on specific functions. If 100% of a employee's time was spent on a
particular function, the employee was placed wherever the function was located. Employees whose
jobs were split between functions participated in an all-day Job Fair where they could interview for
any of the new/vacant positions. Each existing supervisor had an opportunity to identify three
supervisory and three non-supervisory positions he or she was interested in. The SLT selected the
people to fill the various positions.
The Regional Office used consultants during its reorganization and relied heavily on a book by
William Bridges titled Managing Transitions - Making the Most of Change, as a guide for working
through the difficult challenges presented by a dramatic reorganization. The SLT used the book
throughout reorganization planning. The Design, Implementation, and Transition Teams also used
the book. The SLT and Team members considered the book an excellent resource.
While Senior Management and the Design Team designed a process to ensure staff involvement and
buy-in to the reorganization, some staff feel they were not meaningfully involved. Staff realized that
the SLT and the Design Team would probably feel like they had spent six to seven months trying
to get input, but some staff expressed concern that the efforts to involve them did not seem focused
and that the information wasn't always presented in a way that was useful to them. The goals for
the reorganization did not uniformly funnel down to all the troops. Different staff thought the
Appendix 2a: Region-Specific Observations: Region VIII, Denver, CO
89

-------
Management Review: Innovative Regional Structures			December 13, 1996
reorganizationhad occurred for different reasons (e.g., had to address enforcement reorganization;
had to move from stove pipe structure to themes).
Staff seemed to be overwhelmed with too much information and noted that "The Think Tank" had
papers all over the room. Many staff did not read the reorganization plan, because they did not
believe the it would happen. Other staff noted that it was their impression that it was a given that
the Regional Office was going to reorganize; there was no choice. Some staff felt as if the Region
had not analyzed what was and was not working before they reorganized, and wondered why not.
Staff said the SLT presented them the reorganization design and indicated that the details would be
filled in later. Some staff feel they still do not have the details.
The work of the Implementation Team was driven by the September 30, 1995, deadline and was
compressed/cut short. The Human Resources Office was busy developing PDs, advertising and
hiring Some of the Implementation Team found themselves new managers of key programs and
had to move on to managing the programs. The Implementation Team needed more time to train
and educate staff A lot of the ImplementationTeam's time was spent working with staff, answering
questions and explaining the reorganization. People started paying attention once they were in their
new jobs.
The SLT and Regional Leadership Team (RLT), made up of 45-50 Regional managers/program
directors continue to be active in the transition phase of the reorganization. RLT members are busy
learning their new program responsibilities and tracking the success of their programs and staff in
adapting to the new organization. Issues are brought back to the RLT for consideration. The
Transition Team distributed a survey to the SLT and staff regarding how well the work hand-off
went. The results will be gathered and analyzed.
Jane Chadbourneis responsible for leading the effort to measure the success of the reorganization.
Senior management considers Jane the conscience of the Regional Office. She is advising the SLT
on organizational issues. A cross-Regional effort has been initiated for the SLT to define what is
not working and identify ideas for fixing problems by the end of the year. Workgroups have been
established to address specific problems (e.g., workgroup re: files and records management) and
make recommendations to managers. The Region's Reinvention Process Re-engineering Expert
went on a detail. Some feel that the Regional Office needs to refill the position in order to revise
processes that need to be streamlined.
In spite of management efforts to reach out and involve staff and to develop buy-in for the
reorganization, the Regional Office underestimated the resistance to change and the emotional
impact of the reorganization. The reorganization, budget, and shutdown problems and the Region's
inability to relocate all new groups quickly together created morale problems. The reorganization
was hard for many, and especially for those who are no longer supervisors. A few of them expressed
a sense of failure and believed at the time of the interview that the Region had not done enough yet
to help them transition.
Some technical staff resent the fact that supervisors who lost their supervisory positions were moved
into technical expert positions. Some technical staff believe these moves cut out/reduced their
Appendix 2a: Region-Specific Observations: Region VIII, Denver, CO
90

-------
Management Review: Innovative Regional Structures
December 13, 1996
options for pursuing the technical career ladder. The technical experts do not believe they can
compete with former managers in spite of their education and expertise. Program technical experts
feel like they have to re-prove themselves as experts to new managers and find it demoralizing to
have to justify every decision they make/ recommend to every new manager in the management
chain. Staff are frustrated with the number of people they need to sign off on actions where roles
and responsibilities are not clearly defined yet. Staff were overwhelmed by the amount of change
all at once and the number of physical moves. Transaction costs have been tremendous.
SHARED VISION AND VALUES: Region VIII entered the reorganization process with an
explicit statement of vision, mission and values. Staff input to the process of developing these
statements included an all employee staff survey with 68% of staff responding. While few staff may
be able to recite the vision statement, many staff clearly identified the Agency's Five Year Strategic
Plan (July 1994), known to most as the "orange book," as the centerpiece of the vision for the new
organization. At the same time, some staff remain unclear as to why the Regional Office
reorganized. The "why" was also unclear to some of the State officials interviewed.
CUSTOMER FOCUS: Under the various banners of stakeholder involvement, partnerships and
customer focus, Region VIII sought process and cultural change in how they interact with their many
varied publics. Significant efforts were made to seek input from States, Tribes, environmental
groups and the regulated community during the organizational design process. States were
appreciative of this opportunity.
In shifting around many staff and managers, some customers lost their historical point of contact.
In some of these cases, relationships are of paramount concern to the customer. It will take time to
establish these new relationships and networks. There is still substantial confusion, internally and
externally, about who to call for what. In the months following the implementation of the
reorganization, some of the States perceive that Region VIII became very internally focused, as
people and programs got sorted into place.
Beyond cultural/behavioral changes, Region VIII made structural changes which provided greater
customer focus for some programs. Creation of State Assistance and Tribal Assistance Units have
provided those customers with very clear points of contact, dedicated to serving their concerns.
These customer sets are covered more efficiently. The new ORC has clarified the role of counseling
attorneys which has been advantageous for program clients.
Some NPMs do not agree that there is sufficient internal customer focus on national program
issues/concerns.
DIVERSITY: Due to the Agency's hiring freeze, the diversity of the Region VIII workforce is
basically unchanged over the past year. The supervisory positions in the new organization were
filled primarily from the existing supervisory pool. Therefore, not much change could take place
in the diversity profile. However, despite the loss of one Hispanic male supervisor, the Region
added one Hispanic male and one Native American female through merit promotion competition of
four supervisory vacancies.
Appendix 2a: Region-Specific Observations: Region VUI, Denver, CO
91

-------
Management Review: Innovative Regional Structures
December 13. 1996
ORGANIZATIONAL DESIGN: Region VIII's reorganized structure reduced the number of
layers, thought not necessarily consistently. They did eliminate the Deputy Director level across the
organization. It was noted that eliminating deputies hinders continuity in senior-level decision
making and meetings since the ARAs are out on the road a lot.
In most cases, the first-line supervisors report directly to the Assistant Regional Administrators,
effectively eliminating the middle management layer. In some cases there are teams operating
within these units. However, some parts of the organization have two management layers below the
ARAs, particularly where the number of people in a particular program area created untenable
structures. For managers with multi-program responsibilities, there are just too many national
meetings for some to be able to cover and Headquarters folks are not always accepting of attendance
at national program meetings by non-SES managers..
A major design objective of the reorganization was to build a dynamic organization, one that could
change with changing external forces. It is hoped that future changes would be small adaptations
rather that the wholesale change that occurred this time. It is far too early to evaluate this goal.
Between structural and personnel changes, there has been enormous strain on communication and
coordination, both within the Regional Office mid in its dealing with all external parties. Concerns
about "who do I call," "who can talk to whom and how many people have to be coordinated with
abound.
Many more people are talking with each other in the Regional Office, building a much greater
awareness of what the Region is doing. Some elements which previously had to coordinate across
the former organization were structurally consolidated and now communicate much more smoothly
and can speak with one voice (e.g-, enforcement, Tribal assistance, P2). Transaction costs for some
within-media business that is now located in multiple parts of the organization has significantly
increased (e.g., pesticides, RCRA).
Region VIII feels most designated contacts have the authority it needs to deal with Headquarters.
However, some external parties (e.g., States, Headquarters) would still rather talk with an SES-level
director than a "program leader."
Between new faces, new units and unclear titles for some units, some outside parties, including
Headquarters, do not know who to call or where to get information. Also, there are still people
within the organization who do not know where to refer outside calls. It took too long to update the
phone book after the move, compounding the confusion. In the absence of an updated phone book,
employees were asked to update their personal information as needed in an electronic LAN-based
phone book, but many employees did not follow through.
Proposals and action ideas for improving work processes and systems were featured prominently in
Region VIII's reinvention plan. Region VIII piloted the first "block" grant with North Dakota and
has been the fastest Region to develop and sign Performance Partnership Grants with its States.
Appendix 2a: Region-Specific Observations: Region VIII, Denver, CO
92

-------
Management Review: Innovative Regional Structures
December 13, 1996
Some staff feel that not enough attention was paid to reinventing or inventing basic processes needed
within the new organization. Some basic processes lacked vested owners until the new organization
was actually implemented. Then the need for efficient processes became a harsh reality overnight.
The need for definition and refining of many processes remains.
NEW WAYS OF OPERATING: The Regional Office met the required supervisory/employeeratio
as part of the reorganization, but there is general concern at all levels of the organization about going
to 1:11. It has been very hard for managers—many of whom have a huge span of control and many
of whom are assigned to a new substantive work area. Some noted it may be harder for staff not
ready for empowerment. Staff have come to expect frequent interaction with managers and now they
are often on their own.
Senior management designed the reorganization for greater empowerment. They wanted supervisors
to be supervisors, and not program managers. A large percent of supervisors (60-80%) are doing
program management. Managers in the new organization were envisioned as focusing more on
strategic priority setting, coaching and administrative resource needs and less on technical
management. However, some managers are struggling with their new roles and responsibilities as
they try to break the EPA culture of supervisors as technical experts. Regional management noted
that while the Administrator pushed empowerment for a while, the Regional Office has not heard
much about it from Headquarters in the last couple of years. The Regional Office believes that,
based on its behavior, Headquarters management still expects Regional managers to understand
program details. The Regional Office has provided training for managers on empowerment, but is
only beginning training for staff.
There is still confusion regarding the accountability part of empowerment. Some staff think
empowerment is license to do what they want, without accountability. Some staff are lost/not ready
for empowerment. Empowerment is particularly difficult for staff who have been moved into new
program areas and job responsibilities under new managers, many of whom are learning new jobs
as well and do not have as much time as they might like to work with staff.
Some Regional employees feel like program directors often have to wear too many hats. For
example, some are first line supervisors, second line supervisors, staffers, and members of the RLT.
Some managers lost their administrative help; many managers are now typing, Xeroxing, and taking
phone messages. The Agency needs to more clearly define the role of manager, i.e., managers of
programs v.s.. managers of people; what's the appropriate balance. There is still-confusion regarding
the differences in the roles and responsibilities of managers/supervisors and team leaders. Union
representatives consider the roles of team leaders ambiguous. The perception of the union
representatives is that some team leaders operate as supervisors, and, in their view, if team leaders
are supervisors, the Regional Office has not met its 1:11 goal.
Region VIII has strived to make cultural changes in the use of teams and the- role of managers.
Teams have been emphasized and continue to work within and across organizational boundaries to
provide emphasis on particular priorities. Teams, particularly in CBEP, are able to bring sharp focus
to specific environmental areas of concern. Region VIII also has in place a mechanism, the Change
Team, specifically designed to support teams and their establishment. Still, Region VIII has found
Appendix 2a: Region-Specific Observations: Region VIII, Denver, CO
93

-------
Management Review: Innovative Regional Structures
December 13. 199G
it much harder to get successful teams off the ground than had been hoped. It is a lot of hard work
and not everyone is cut out for teams.
There are two Regional management teams. The Ra, DRA and ARAs comprise the Senior
Leadership Team, which focuses on the big picture and a few individual sensitive issues The
Region also created a Regional Leadership Team comprised of all its Program Directors and some
non-supervisory managers, modeling the team approach in involving all of them in significant
Regional management decisions. The Regional Leadership Team has promoted great
understanding, buy-in and communication of management decisions they have worked on It is 61
without substantial challenges though as getting the 50 person team to consensus on issues is ve^
time consuming.	™
The Regional Office has suffered a significant loss of institutional memory due to the significant
movement of staff and managers and changes in their roles and responsibilities in the Regio 1
Office. About half of the new managers had no program experience in the jobs they were mov™d
into. In some cases, staff feel like they are continually educating the new managers, who frequent!
do not understand even the underlying statutes. Work slowed for a while, in some'programs unH
new managers were educated/trained.	'
ACCOUNTABILITY AND INTEGRITY
This section focuses on how well the reorganization has positioned Region VIII to
establish appropriate organizational structures, policies, and procedures to provide
reasonable assurance that the goals/objectives of Agency senior leaders are carried out
effectively, efficiently, and in compliance with applicable laws, regulations and central
agency guidance.
RESOURCE AND MANAGEMENT INTEGRITY: Improving or maintaining the integrity of
the resource management structure and the capacity of the Senior Resource Official (SRO) to ensure
resource management was a principle the Senior Leadership Team was guided by during the
reorganization. Though the structure was changed somewhat, the integrity of the key processes has
been preserved.
In an environment where many managers changed jobs, Region VIII kept key, seasoned managers
in charge of their critical resource operations. Region VIII eliminated the Comptroller position, after
very careful consideration, knowing that it would keep in place very competent and experienced
finance, human resources, and budget officers and would be bringing in an experienced grants
manager.
Appendix 2a: Region-Specific Observations: Region VIII, Denver, CO
94

-------
Management Review: Innovative Regional Structures
December 13, 1996
This stability helped them weather the budget crisis in early FY 1996 and allowed them to focus on
helping others, particularly the Administrative Officers (AOs) serving in new program offices.
Those AOs are now mostly up to speed. The SRO utilizes performance measures for SRO functions,
including review of the Agency's core financial measures monthly.
Region VIII's operating plan process was basically unaffected. The budget staff interviewed all
managers and went person-by-person through the organization to ensure that people were charged
to appropriate program elements. Even without the reorganization, there is a growing disconnect
between the increasing multi-media work being performed and the Agency's historical media-based
program element structure. Well over half the staff are now appropriately working on split fixed
account numbers.
The Regional Leadership Team has been involved in decisions on how to allocate dollars and
positions, strengthening their understanding of the decisions and attendant responsibilities. The
downside is the time it takes to work such decisions through a group of 50 people. There appear to
be clear lines of authority and understanding of the accountability of program directors for resource
management.
The State Assistance and Tribal Assistance units have designated contacts who serve as Project
Officer for each State or Tribe, bringing most assistance resources into focus. However on the grants
administrations side, while the structure was basically unchanged, the grants workload is
"exploding" without increasing resources. This was felt to not be directly related to the
reorganization.
The budget crisis had a tremendous effect on the reorganization. Region VIII had to delay its move,
could not travel to visit new customers and could not hire. It made things especially difficult in the
new initiative areas.
Changing the responsibilities of so many staff and managers did temporary damage to efficient
resource utilization as people struggled with exactly what they were responsible for and how to
properly charge it. This is viewed as a "one-time cost."
PROGRAM ACCOUNT ABILITY: One of Region VIII's aims was to incorporate a dynamic, on-
going evaluation process that would measure a combination of activity/ output measures,
outcome/result measures and some "temperature checks." In particular, they sought to develop
effective indicators for cross or multi-program initiatives. There is early evidence that geographic
teams are now more focused on results oriented problems.
Region VIII has built a network of senior planners and analysts (reporting to each ARA) who are
helping move toward more GPRA-type thinking. This group recently produced a Regional strategic
plan with each office responsible for measurements, dates and deliverables. Contained in the
Strategic Plan is the development of a new Integrated Environmental Data System.
Region VIII focused on and revised the most critical delegations of authority in advance of
implementing the reorganization, so all the needed authorities were in place when needed. In the
Appendix 2a: Region-Specific Observations: Region VIII, Denver, CO
95

-------
Management Review: Innovative Regional Structures
December 13, 1996
process, some authorities were delegated further down in the organization. It has taken much longer
than anticipated to revise or establish delegations within offices. This is attributed by some, at least
in part, to having many managers in new positions who were unable to rely on experience to tell
them the best level for delegation. The Regional Office has a delegations group now focused on
reviewing and revising delegations to the ARAs..
Some programs are experiencing higher transaction costs in the MOA process because they are
located in different parts or the organization. For example, basic responsibility for the MOA with
OPPTS rests with the manager of the Toxics Program. However, the MOA includes Pollution
Prevention activities, which are the responsibility of another manager. These two elements, which
operate independently, must merge their MOA pieces to feed to OPPTS. Others noted, however,
that this split of responsibility was even greater before the reorganization - now, at least both
pesticides, toxics and P2 functions are in the same Office. Also, there is no Headquarters system that
focuses on or tracks multi-media work. Even within OECA, accountability is media-specific.
OTHER RELATED ISSUES: This section captures information on other reorganization related
impacts not found in the preceding sections. Region VIII's reorganization had repercussions on
Regional infrastructure and labor-management relations as well.
Region VIII established a files management workgroup to deal with historical shortcomings issues
brought to a head by the reorganization. They are now making a real investment in files
management.
Agency-wide administrative systems that managers must rely on (e.g., time and attendance,
performance management) have yet to be simplified and automated to help managers deal with the
increased number of employees reporting to them.
Budget, battles with Congress, shutdowns, and other constraints postponed the physical relocation
of people into their new organizational groupings for months, sapping momentum for change.
These constraints kept people from moving their phone numbers with them, which added to internal
and external communication problems.
Despite what management felt was a very inclusive design process, AFGE Local 3607 requested
bargaining on 25 specific bargaining issues very close to the point of implementation and after the
deadlines for such requests required by the Collective Bargaining Agreement. Management did not
grant an extension of time. An Unfair Labor Practice was filed by the union over the refusal to
bargain and the deadline. The FLRA declined to issue a complaint. The tension spilt over into
bargaining over space and how the move was to be executed, contributing to the delay in
implementation.
The Agency's IRM infrastructure has not kept up with reinvention goals. There continues to be too
much reliance on "legacy" systems, and too little investment in systems to support more multi-media
work.
Appendix 2a: Region-Specific Observations: Region VIII, Denver, CO
96

-------
Management Review: Innovative Regional Structures
December 13, 1996
APPENDIX 2b
Region VII, Kansas City, KS
REGION-SPECIFIC OBSERVATIONS
Site Visit: August 14 -16.1996
Organizational Structure Prior to October 1, 1995
Current Organizational Structure
Appendix 2b: Region-Specific Observations: Region VII, Kansas City, KS
97

-------
Management Review: Innovative Regional Structures
December 13, 1996
BRIEF DESCRIPTION OF THE REORGANIZATION, and STATED
INTENTIONS AND DRIVERS
Region VII's reorganization was characterized by strong direction by senior management, moderate
structural change (see attached organization chart), and substantial organizational movement of
managers and staff. Senior management identified the principal drivers of the reorganization to be
the need to achieve and supervisory ratio of 1:11; a requirement to select one of the enforcement
options proposed by HQ; and the interests in minimizing the disruption to the existing relationships
with States and in maintaining links with HQ offices.
The senior leadership of Region VII played a particularly important role in planning and leading the
reorganization. They met early on to produce the "Rockhurst Consensus" the outline of the major
features of the Region-wide reorganization, the so-called "macro" changes. These structural changes
were put in place before each new division was invited to plan for its own internal organization
Staff participation had a much bigger effect on this second-round process. Senior management also
controlled the process of selecting supervisors and senior experts as well as the movement of staff.
Overall, the senior managers spent a considerable amount of time and energy on the reorganization
and its impact on staff.
The most significant changes were as follows.
•	The Region considered but rejected the option of consolidating enforcement into a
single division. Rather, they opted for the enforcement coordinator model of Option
2 with the creation of a new, small coordination office reporting to the DRA. The
reorganization left enforcement functions in the various media offices and in ORC,
which internally reorganized to stress a multi-media approach. The Region also
continued the successful Multimedia Enforcement Coordination Committee.
Selection of this option built on strong existing enforcement relationships within the
Region. The Region also acknowledged that a consolidated enforcement division
would have moved 40% of the entire Regional staff into a single office.
•	The Region created an Air, RCRA, and Toxics Division to address environmental
issues of the industrial sector. This was done over the objections of the RCRA staff
who resisted separation from Superfund, and the objectionsof OPPTS, which wanted
the toxics and pesticides programs to remain together. P2 was relocated to this new
Division. To focus on agricultural issues, the Region created the Water, Wetlands,
and Pesticides Division. This Division became the home to NEPA issues and took
the lead for the Region on CBEP matters. The Superfund Division combined the
remedial program, the removal program (formerly housed in the Environmental
Services Division), and enforcement. The Office of Policy and Management was
encouraged to become more customer focused. ESD now has responsibility for the
lab, field inspections, the GIS function, and QA/QC.
Appendix 2b: Region-Specific Observations: Region VII, Kansas City, KS
98

-------
Management Review: Innovative Regional Structures
December 13, 1996
•	The Region removed a layer of supervision to meet 1:11, reducing the number of
supervisors by approximately half. All supervisory jobs were competed, with senior
managers making consensus decisions about new placements in light of the skills
mix. In doing so, they first sought out the best managers. The results were then
examined to assess the impact on the diversity of the workforce; the diversity profile
apparently improved, in part, because the process was so open. They also stressed
cross-media movement; as a result, most new supervisors had different positions than
before the reorganization. The Region also tried to use the dual career track concept
in creating senior technical expert positions for some of the former supervisors.
•	States and tribes have ended up with many new contacts. The Region stressed the
importance of communications with the external partners about the reorganization,
in the interest of minimizing the disruption; senior management got directly
involved. As one plus of the reorganization, States now mostly deal with only two
senior managers, rather than four, on PPA/PPGs.
STRATEGIC PRIORITIES
This area ofstudyfocuses on how well the Regional reorganizationhas positioned Region
VII to carry out the broad, highest-priority areas/themes/goals/guiding principles
outlined in the Agency's FY 1995-96 Strategic Plan, for the current andfuture work of
the Agency.
COMMUNITY BASED ENVIRONMENTAL PROTECTION: The Region VII reorganization,
as noted above, was focused on the two major divisions addressing the environmental concerns
associated with the industrial and agricultural sectors of the Midwestern States. Because of this
focus, smaller program initiatives, such as Community Based Environmental Protection (CBEP) and
Pollution Prevention (P2), were not major players in the new organizational design. The new overall
Regional structure reflects the concerns of senior management, which directed the newly-located
divisions and branches to design their own new organizations.
The Region VII CBEP organization resulted from the internal division design process rather than
as a feature of the macro changes directed by senior management. CBEP is located within the water
program, but structured to function on a multi-media basis. The Region VII CBEP employees
expressed concern during the interview that this placement does not succeed in emphasizing the
multi-media functions of place-based activities that they consider important to the program. The
CBEP program in Region VII is focusing its efforts on working cooperatively with its States on the
projects. The Great Plains and the Platte River projects are the primary efforts the CBEP staff is
Appendix 2b: Region-Specific Observations: Region VII, Kansas City, KS
99

-------
Management Review: Innovative Regional Structures
December 13, 1996
coordinating State involvement is considered especially important as both of these projects have
multi-state dimensions, rendering them parncularly complex.
Although Region VII has not yet reached an allocation of 20% of its resources to CBEP projects, it
V • ~ tw thic Wei k nossible in the near term due to senior management's interest in the
anticipa es	Region outlined their current focus for the program as institutionalizing
^^Iwrtharfhnn^diatelyattemptingto reach a predeterminedresource allocation level. The CBEP
learn expressed its frustration with the number of conflicting messages sent from vanous EPA
Headquarters' offices regarding CBEP s urgency.
POLLUTION PREVENTION: Pollution Prevention in Region VII formerly was a one-person
operation in the Waste Management Division. When the Region was reorganizing, the senior
+ a int«=>aratp P2 into more of the Region s programs. Their initial inclination was
designation The P2 meeting participants, when asked, indicated they did not know why P2 was
nlaced in that Division The Region's operating philosophy of Pollution Prevention is as a line
nroeram rather than as a culture change in how businesses operate. The participants stated that they
U •' ~ rKffViiitv ohtainine broad Regional office involvement in the program; a cross-Regional
are havmg difficulty obt^nmg D	coordinate P2 activities, but the staff has seen little
voluntary committee was set up ^	...	,	.
enthusiasm from Regional staff and managers, with the committee meetings being poorly attended.
When the Review team looked at the Region VII Multimedia Enforcement Committee, we thought
P2 might have an increased chance for success if it were placed in the Regional Administrator's
office.
PARTNERSHIP WITH STATES AND TRIBES: In general, States and Tribes were in agreement
that there has been a fair amount of disruption in their relationship with the Regional office due to:
•	The reorganization'schanging around the Regional staff with whom they (and their
state colleagues) are used to doing business.
•	Region VII staff hesitancy resulting from new jobs in programs with which they had
little prior experience.
State Comments- There was agreement from the state officials' comments that the disruption is a
situation that should settle down over the short term.
The States were in agreement that the Region had kept them well informed as the reorganization
plans developed via meetings and faxed and mailed notices. Relationships have remained good
between the senior officials in the States with the Regional senior management; the major disruption
has primarily been at the staff level- The State officials had a noticeably mixed response to our
questions regarding NEPPS.
Appendix 2b: Region-Specific Observations. Region VII, Kansas City, KS
100

-------
Management Review: Innovative Regional Structures
December 13, 1996
One participant indicated that when the Region requested the State's comments on the
reorganization, the State purposely declined to comment, as a precedent in maintaining its own
State's reorganizing prerogatives without Regional interference. The participant stated that his
experience with the Region since their reorganization depended on the extent to which a specific
division was reorganized: e.g., his relationship with the water supply program was quickly
reestablished, but in the wastewater program, which was more drastically affected, the staff is still
learning and not particularly assertive or interested in learning about the environmental situation in
his State. He does see the water supply staffer in his State about once a month, which is new and
is working well. He provided an example on the lack of Regional responsiveness involving a
program delegation application (dating to 1994, before the reorganization), where Region VII never
acknowledged receipt of the package, nor gave a good response; he blames this on the reorganization
because the new people, he said, do not know the history of transactions or who to work with.
Another State official suggested that he thinks the reasons Region VII reorganized were because of
a Headquarters directive, including the need to reduce overall staff supervision to the 1:11 ratio, to
move the Region to a cross-media approach, and to provide staff rotations. The official went on to
say that he believes that the Region's management is heading in the right direction, and that the
reorganization has a good foundation. He expressed some concern regarding at least the short term
effect of the reorganization on the ability of the State to implement the Region's priorities in its
Memorandum of Agreement. This concern was based on the water program's developing its
national priorities without consulting the State; any new manager in the program as a result of the
reorganization will likely have little experience and expertise in the program to fully comprehend
the State's interests. The participant agreed he moves his staff around as well, but only as needed
to ensure program success not to provide his staff educational opportunities. He did indicate that
he likes the Region's multi-media approach; previously, with both the state and the Region
structured along media programs, his staff needed to be in contact with 12 different people. His
needs can now be covered with a good relationship with the Air, RCRA, and Toxics Division.
Overall, the state has had a good relationship with Region VII, which continues, and he feels it is
too soon to tell whether the reorganization will further improve communications between the two
organizations.
The last State participant stated that he thinks Region VII reorganized to change the alignment of
the office to base it on programmatic lines instead of bureaucratic lines. The realigned Superfund
program is now much like what his State had already done with its own Superfund program, which
he sees as a direct improvement resulting from the reorganization. He also sees an improvement in
the financial management relationship between the Region and his State. The State has had an open
relationship with the Region, and the two staffs are getting reacquainted since the reorganization.
This official stated he sees the biggest obstacle as his sense of Regional staff inertia, that the staff
is moving slowly in anticipation that life will return to the way it was before the reorganization in
a year or so.
Tribal Comments: The team spoke with one Tribal representative from Region VII; the
representative said that since he has only been in his position for two years, he does not have enough
experience to compare his relationship with the Region before and after the reorganization. He did
say that he has not noticed any changes in the relationship during his tenure. He said that although
Appendix 2b: Region-Specific Observations: Region VII, Kansas City, KS
101

-------
Management Review: Innovative Reqiona! Structures	„
												 December 13, 199a
he is not always able to reach the staffon his first try, he knows his contacts and gene II
his messages are promptly returned. He would prefer one point of contact rather thanthe^V"*)8 *
he currently works with. His Tribe has 7 grants (general assistance; radon; wetlands- EJ- C I 'H
water 104 (b), 106 and 319; and lead paint) which require his working with the grant sDec' rTf6'
each plus the Regional Tribal Coordinator. He prefers to deal only with the Tribal C 'd
which would simplify his grants paperwork process. The tribal participant also d' ^
differences in the roles of the Federal Government, the States, and the Tribes. Heco 1SCUSSe,
the States have substantial bureaucracies to deal with the Federal Government, but the'l^h0^
have the resources to establish such a relationship. The Tribes are very small which th % d ^
Government needs to consider in its relationship with the Tribes.	'	C ra*
Performance Partnerships: The Review Team asked the State participants question
Performance Partnership program during the interviews to get an idea of their confid*>nS ^ u
Regional offices' capacity to negotiate the PPA/PPGs in the context of the veoronn * ?
Additional opinions on the PPA/PPGs not particularly germane to the reorganizations vtcr*0]*'
offered which the team is providing as potentially useful information.
One participant stated that his boss is "not thrilled" about the PPGs; he feels that the
program in his state depends on the Region's "salesmanship", or convincing the aateth!*
program will enhance progress if they participate.	t"e
Another representative likes the concept of Performance Partnerships, but is not sure how th
work for his State. The promise of flexibility is appealing, but since the state has not had one
oversight from the Regionin the past, they do not see any problem'sthat PPGs will correct H fiS
concern, ironically, is the very flexibility the PPGs offer could interrupt other state envirom^Tf
funding. This State's environmental programs are funded by highly sensitive and n \
calculated user fees, which by law must be spent on those specific uses. The state's abT°
determine the programmatic uses of a PPG could, therefore, lead to a conflict with the^ t0
legislature. This participant also commented on Regional oversight of his programs- the state h
had its programs delegated for 10 - 20 years, with annual audits proving a histor/ of sue
Because of their history, they believe the Region should further reduce oversight without delay5*
The third representative we spoke with stated that although he likes the idea of the flexibility offe h
by the Partnerships, and he is currently in discussions with the Regional office for a limited PPr
his personal preference is to move slowly on all new initiatives.	'
ENFORCEMENT, COMPLIANCE, AND COUNSELING: As noted above, Region VII sele«,H
the enforcement option which provides for keeping enforcement capacity distributed amon^
'¦"? h at!TeyS in °RC; Md m Enforcement Coordinate
Office (ECO). The Region constdered creatmg a consolidated enforcement division, recognSn»
the importance of keeping enforcement numbers up and considering the small size of the Reei™
However, like other features of,he, ^reorganization, the Region opted for the less dramatic option'
The Region also decided to ream the Mult,media Enforcement Committee which was alreS' °n
place and had been effective. About 65% of the Region's inspectors remain in ESD.
Appendix 2b: Region-Specific Observations: Kdgion VII, Kansas City, KC		—			
102

-------
Management Review: Innovative Regional Structures
December 13, 1996
The decision process seemed relatively non-controversial. The programs never wanted the attorneys
to be integrated into their offices and there was little interest among the attorneys in reporting to non-
lawyers. There was also little talk about creating an enforcement division. Given the history of good
coordination and relationships between the programs and attorneys, the decision was made to pretty
much keep the structure as before.
•	Enforcement Coordination Office: The ECO was created to provide more focused
coordination with OECA; to coordinate XL; to track MOA commitments; to serve
as the EJ program manager; and to be responsible for Federal facility enforcement
coordination. The ECO sits in on RC conference calls with OECA.. The ECO has
a staff of two full-time staff and one part-time employee.
It is too early to assess the effect of creating the Enforcement Coordination Office.
To some of the attorneys, it is unclear what the ECO does, other than to help
coordinate multi-media enforcement. There was no indication that the relationship
with OECA has become fuller as a result of the creation of the ECO.
Implementation of Project XL may be enhanced with the ECO serving as focal point;
however, only one project is underway. (CSI is located in the Air, RCRA, and
Toxics Division).
One area which deserves attention is enforcement data collection. While the ECO
is the focal point for enforcement data, most Air and Water enforcement data is
inputted by the States. The quality of this data is suspect. Among the problems with
state-reported data is the fact that the Region was unable to get water enforcement
targets to the States and that pesticides production data has not been reported for
three years in some cases. As a result of these and other factors, data integration is
still problematic, making it difficult to respond to inquiries.
•	Multimedia Enforcement Committee: The Multimedia Enforcement Committee
(MMEC) serves as a board of directors in looking at overall enforcement policy. It
promotes coordination for enforcement activities as well as good communications.
Historically, the MMEC was composed of branch chiefs, ORC representatives, and
others. Forty people are now on the Committee, including the DRA, but only about
20 participate in the meetings. The MMEC deals with the Enforcement MOA, but
not with budget. The head of the MMEC used to rotate; now it is the ECO. The
MMEC performs a variety of functions including planning targeting for the
inspectors and preparing a multi-media inspection checklist. There is also a
Multimedia Inspection Team.
•	Compliance Assistance: The Region's compliance assistance activities did not
change much as a direct result of the reorganization although the use of a sector
approach has enhanced multi-media focus. The integration of compliance tools is
taking time. Also, measuring compliance is difficult. However, Region VII has had
some success in establishing a multi-media database of non-compliance which is
Appendix 2b: Region-Specific Observations: Region VII, Kansas City, KS
103

-------
Management Review: Innovative Regional Structures
December 13, 1996
used by the MMEC, as well as a manual tracking system for negotiated Supplemental
Environmental Projects.
•	Office of Regional Counsel: The reorganization process seems to have produced
important results with the Office of Regional Counsel. There was a vigorous process
involving staff to enhance the ORC's multi-media capacity and to address historic
problems relating to internal communications, the lack of empowerment. As a result
of the process, things are apparently running smoother, responsibilities have been
clarified management of ORC is more through a team of senior supervisory and non-
supervisory lawyers, and ORC has demonstrated that individual attorneys can
successfully work across media areas. Some staff within ORC view having a single
level of sign-offs as a big improvement.
ORC has tried to enhance its multi-media capacity and the morale of staff by
expanding the areas within which attorneys can work. There is now ample
opportunity for attorneys to perform legal work in more than one media area - anyone
who wants to, can. There are also ample opportunities to do both counseling and
enforcement and that is seen as a good development. Some in ORC believe that it
is important that the expert in an enforcement area also be able to draw on that
expertise to provide counseling. It was also noted that small Regions need the
flexibility. When asked whether there was any conflict between performing
enforcement and providing counseling, there were a variety of answers. One attorney
claimed she is never an enforcement advocate - that is the program's role. Another
sees herself as a prosecutor; she always wants to define her role up front. In
employment law, apparent conflicts may arise depending on whether the attorney is
acting as an advisor or participating in defensive litigation/adjudication.
Notwithstanding the range of these responses, the attorneys in ORC seem to welcome
the opportunities to work in a variety of legal areas.
The expert system implemented by the reorganization to reach the 1:11 supervisory
ratio seems to be working well in ORC, better than in the program offices. Legal
supervisors, especially a new supervisor, relies on the experts. It is a demanding job,
however. Experts must make themselves available and it is hard to keep up with
their own staff work. By contrast with ORC, in the programs, the former supervisors
are poorly treated; even when designated experts, and their roles are poorly
understood.
•	Environmental Justice: Senior management initially deferred a decision where to
place the environmental justice coordination function. Eventually senior
management decided that EJ should be with the ECO, in part, because the ECO has
contacts with all the media programs. This was to address the problem of
inconsistent levels of EJ activity among the Divisions. It was a goal of the
reorganization to underscore the importance of EJ, and to align the placement of EJ
with HQ, by placing it in the DRA's office (i.e., with the ECO). While there seem
to be some increased investment by senior management in EJ, it is too early to assess
Appendix 2b- Region-SpecificObservations: Region VII, Kansas City, KS
104

-------
Management Review: Innovative Regional Structures
December 13, 1996
the results of this placement decision. [Although vacant at the time of the Team's
visit to Kansas City, the EJ coordinator position has now been temporarily filled].
It was noted that waste management EJ issues have been lost in the new organization.
REINVENTION PRIORITIES
This sectionfocuses on how well the reorganizationhas positioned Region VII to achieve
the Agency's reinvention goals: Shared Vision and Values; Customer Roots; Diversity;
Working Collaboratively; and Streamlined and Strengthened Organizational Design.
PROCESS FOR REORGANIZING: Region VII began its design process by setting up a
Reinvention Council to develop the reorganization plan for the Kansas City office. The Council, in
consultation with their Regional colleagues, did not solicit ideas for rearranging office levels, but
instead focused on asking internal and external customers and partners about their needs. The
Council followed up with evaluating optional structures which would potentially meet those needs.
Most of their work was accomplished by manual surveys, as the appropriate automated systems were
not available. Reinvention guidance issued by Headquarters was deemed helpful, but arrived too
late to be of use. The Region did contract with a consultant who provided staff seminars on
organizational change, and emphasized the need for a vision to help ensure success.
Ultimately, the Regional Senior Management Team held a consensus meeting and set the macro-
organizational framework for the Divisions. The Senior Management Team also made the decisions
on the new managers and experts. The driving force for their plan was reaching the 1:11 ratio and
optimizing the Region's organization at the same time. Understanding that the Region's main job
is working with the States, the senior managers claimed that they worked to implement the
reorganization with as little disruption as possible to the Region's relationship with the States and
with Headquarters. However, as noted elsewhere, there was some disruption initially, at least, for
the States given the substantial turnover in managers and, to a lesser extent, staff.
Regional management, once they determined how the overall Regional structure would change by
moving the former branches and sections to new locations, encouraged staff collaboration and "buy-
in" to the new reorganization by giving the new organizations the responsibility of designing their
own structures.
The Region's senior managers told the Review Team about the effort they made to communicate
their reorganization plans to the staff to the point where they felt they had gone "overboard". Their
communications consisted of open meetings and constant LAN updates. The Team heard more of
a mixed message from the staff, however, on the effectiveness of internal communications regarding
the reorganization. By establishing the "Technical Experts" classification, for example, senior
Appendix 2b: Region-Specific Observations: Region VII, Kansas City, KS
105

-------
Management Review: Innovative Regional Structures
December 13, 1996
management succeeded in avoiding a potential class of highly-graded detractors, but created
confusion by not communicating to the staff how this new group would contribute or function.
Although the Team heard a number of other communications complaints, the confusion about the
role of the Technical Experts cropped up with some frequency. The States in Region VII were
largely complimentary of the effort made by the Regional office to keep them informed of how the
reorganization was progressing.
There was a sense expressed by the senior managers that the Regional administrative systems need
to be simplified, but that has not yet happened. There was an additional concern expressed by
quoting a consultant used during the reorganizing process, who warned the senior managers that
people are able to handle only a certain amount of change, and that between the reorganizations and
the government shutdown, the Agency might be on change overload".
The Regional managers continue to get feedback on the reorganization results, and plan to make
adjustments where they are necessary; they understand that to be effective, best results will be
obtained in a continuously improving organization. The senior managers are investigating methods
on how they can measure the success of the Region VII reorganization.
SHARED VISION AND VALUES: Region VII senior management, in a round table discussion
with the Team, indicated they had two primary goals they wanted to achieve in reorganizing:
1)	Avoid any action that would disrupt the relationship with the States, given the
importance the Region places on maintaining good Regional-state relations.
2)	Reduce its supervisor-to-staff ratio to 1.11.
According to the conversations we had with the Region VII staff, they understood the reorganization
goals principally to be streamlining, flattening, staff empowerment and customer service along with
reaching the 1:11 ratio.
The results of the discussions in the Regional office all indicate these goals as the primary focus of
the reorganization, with the intended result that the Region would function more effectively. The
parallel discussions with the Region VII States affirmed that the Region worked hard to both keep
them informed of their reorganization progress and to provide the opportunity to comment or make
suggestions; the States also pointed out that although they appreciated the information, they
generally declined to comment as they considered the process best maintained an internal Regional
concern.
CUSTOMER FOCUS: Customer focus, both internal and external, was clearly one of the goals
of the reorganization, especially at the divisional level. This was cited favorably in discussions
about the human resources functions. It should be noted, however, that Region VII' s Headquarters
"customers" identified a serious concern about the elimination of the Human Resources Officer
position. The functions are now shared by two individuals. The Region did not, apparently, work
closely with Headquarters on this issue and it remains unresolved.
Appendix 2b: Region-Specific Observations: Region VII, Kansas City, KS
106

-------
Management Review: Innovative Regional Structures	December 13, 1996
The reorganization of ESD was driven, in large part, by and with the input of internal customers,
apparently with positive results. However, we also heard that little attention has been paid to the
explaining how to improve customer focus in ways other than changing structures. For example,
there is apparently no common definition of customer service.
DIVERSITY: The internal process included a requirement for each Regional organization to
develop its own diversity plans. Although the reorganization resulted in an increase in the
percentage of women in the management ranks, any further improvement in diversity was affected
by the Agency's overall budget uncertainty including the threat of RIFs, the hiring and promotion
freeze, and the government shutdown. Senior management solicited applications for the new
management positions, allowing staff down to the GS-13 level to apply, with the plan of boosting
the Region's management diversity.
ORGANIZATIONAL DESIGN: As noted above, the Region selected a structure which was based
in large part on a sector approach, consolidating major programs by their relevance to industrial or
agricultural environmental issues. The Air, RCRA, Toxics and P2 programs were combined
(industrial sector) and Water, Wetlands, Pesticides, NEPA and CBEP programs became a single
division (agricultural focus). The Team considers this an interesting organizational approach.
However, even if the experiment proves useful in Region VII (it is too soon to tell), other Regions
would have to compare the size and geography of Region VII to their own Region before adopting
a similar approach. One Headquarters office responsible for a major program was complimentary
about how that program was being managed as a result of the reorganization; but two HQ offices
were very concerned about the breaking up of small programs under the reorganization.
Region VII also combined the removal and remedial programs into a single Superfund Division.
This move got generally favorable reviews, including by Headquarters. ESD was partially
redesigned, with help from a major internal customer outreach effort. ESD now has responsibility
for the lab, field inspections, the GIS function, and QA/QC. There was some evidence of improved
coordination and better integration of ESD and program activities, presumably as a result of the
customer focus, in part. This situation should continue to improve when ESD is collocated with the
Region in the future.
The Region met the requirement to achieve 1:11 by eliminating a layer of supervision. Where the
Region initially had a division/branch/section structure, there is now a division plus an additional
level, not necessarily identified as a branch. In the final analysis, senior management was fairly
stable although some executives took on new responsibilities. However, most first line supervisors
ended up with jobs which were significantly different than prior to reorganization (see below).
The Team did not identified significant organizational innovations designed to improve flexibility
to handle new directions in environmental protection. In fact, there we heard some concerns about
the placement of two functions which fit into that category, i.e., the CBEP and P2 programs.
However, the Region has emphasized the promotion of multi-media capacity by shifting the jobs of
most managers and it has stressed the importance of teams in addressing cross-cutting issues.
Appendix 2b: Region-Specific Observations: Region VII, Kansas City, KS
107

-------
Management Review: Innovative Regional Structures
December 13, 1996
However, the Regional staff had a fairly strong reaction to the senior management expectation that
teams would comprise a major feature of the Regional structure. In a staff session, a sense was
expressed that Regional management had made an incorrect assumption that everyone would know
how to use teams, but that the concept is overworked and was given no structure. The Region did
make an effort to plan and develop team training before and during the reorganization. Nevertheless,
according to at least some staff members, many team management issues have not been settled,
including: the role of team leaders; when a team leader is needed or not; and what a team leader's
authority is, or should be. [We understand that since the Review Team's visit, Region VII has
undertaken extensive team training for managers and staff].
NEW WAYS OF OPERATING: The requirement to move to a 1:11 supervisory ratio was the
initiator and one of the principal drivers of the reorganization. Management and staff all understood
this, although some staff members commented that senior management never communicated good
reasons for going to 1:11 nor the potential benefits. To reach the 1:11 supervisory ratio, the Region
needed to reduce the number of managers/supervisors by half. This was accomplished by
eliminating a layer of supervision and opening the remaining supervisory positions to Region-wide
competition. Senior management tried to select the individuals with the best managerial skills.
While it is too soon to draw firm conclusions, the move to 1:11 in Region VII is generally viewed
as positive. This is a surprising conclusion, given the negative feelings many other Regions and
Headquarters offices have expressed about 1:11. Some staff believe the reorganization to be a
"great experiment in empowerment;" there seems to be a willingness to give it a chance.
Having heard some positive things about 1:11 and empowerment, there are still a number of
remaining issues and reservations. Some units have a ratio of 1:17 or even 1:35; it is difficult to get
a manager's attention in such situations. Staff recognized that there is great pressure on the new
managers and the risk of supervisory burn-out seems high. This is especially true when supervisors
have trouble letting go of detailed control and when supervisors are expected to have detailed
command of technical areas. The opportunity for empowerment is also received by different staff
members with varying degrees of enthusiasm; some appear to just not be ready to take responsibility.
Also, empowerment does not work as effectively when both supervisors and staff are mostly new
to the area. There seems to be concern about lack of clarity about the "rules" for empowerment, e.g.,
what are the penalties for making mistakes?
Participants in our sessions identified some lessons learned about all of this and suggested things
the Region could still do to remedy continuing problems. First, more could have been done, and still
can be done, to change the way people think about supervision. In particular, supervisors need to
be allowed not to be technical experts, but rather to be mentors and managers. Second, the span of
control for some units could be adjusted to get closer to 1:11. Third, an improved performance
management system could be more realistic about how much managers can be expected to know
about the work of their staffs. Finally, easy access to a consultant might have avoided some
problems.
Region VII recognized that their employees holding managerial positions who would be losing that
designation had technical strengths, other than management, which the Region needed to seize upon.
Appendix 2b: Region-Specific Observations: Region VII, Kansas City, KS
108

-------
Management Review: Innovative Regional Structures
December 13, 1996
Former managers were typically reassigned to a new job classification identified as "Technical
Expert", without loss in grade. The Region thereby used the dual career tack concept effectively.
These experts are expected to be available to assist all Regional staff with difficult and technical
problems that occur. The role of the technical expert is inconsistently understood throughout the
Region. For example, in ORC, the experts are often recognized as major contributors and it is
understood that their jobs are particularly difficult, i.e., being available to help others while doing
their own staff work. In other parts of the Region, however, the role of the experts is not well
understood; some staff members even claim to not have heard of the experts systems. Apparently,
some experts feel poorly treated; this is a major factor explaining low morale in parts of the Region.
Overall, it is not yet clear to the Regional staff how they will work with the new technical experts.
It does appear that the Region has at least partly succeeded in finessing one of the most problematic
results in all of the Regions of reducing to the 1:11 ratio. Not only were the former managers not
simply renamed as "team leaders", preventing resulting shadow organizations to their former
responsibilities,but they filed no formal grievances. The union participated throughout the process
and was in basic agreement with the action.
As noted above, there was a conscious effort to move the remaining managers and supervisors into
different jobs. This was done partly in the name of increasing cross-media experience, a positive
goal. However, the Team heard from a variety of sources that the wholesale movement of managers
caused significant and at least temporary loss of progress. For example, representatives of the States
in Region VII complained about the disruption causes by there being so many new contacts in the
Region. The did express the hope that the interruptions in effective communication would diminish
over time.
Staff were also given the given the opportunity to change jobs, which was implemented by asking
them to express their job preferences. Many staff took advantage of the opportunity to change jobs
as well. This cross-divisionalmovement by staff and managers has resulted in a steep learning curve
that will take some time to settle down. Arguably, the high degree of movement among both
managers and staff has impeded progress toward true empowerment.
ACCOUNTABILITY AND INTEGRITY
litis section focuses on how well the reorganization has positioned Region VII to
establish appropriate organizational structures, policies, and procedures to provide
reasonable assurance that the goals/objectives of Agency senior leaders are carried out
effectively, efficiently, and in compliance with applicable laws, regulations and central
agency guidance.
Appendix 2b: Region-Specific Observations: Region VII, Kansas City, KS
109

-------
Management Review: Innovative Regional Structures
December 13. 199 ft
RESOURCES AND MANAGEMENT INTEGRITY: Resource management processes in
Region VII changed very little as a result of the reorganization. As a result, it appeared that
accounting for budgetary resources was not much more difficult than under the previous
organization. It is interesting to note, however, that the Region has eliminated the Comptroller
position. Primarily, the new organization set up identifiable points of contact for the maio
divisions to work with on their administrative needs. Monthly meetings that were initiated between
these groups to enable them to build a working relationship, instead resulted in this meeting groun
functioning as a resource management team addressing the broad resource questions of the Region
rather than only on division level needs. Additionally, an individual was assigned to focus on the
administrative requirements of the Performance Partnership Grants, which has allowed the Region's
grants management function more time to link with other Agency work. Assigning this "expert" the
responsibility for PPGs seems to have established a working level confidence with the States which
resulted in their increased interest in the PPG program with which they previously had been reluctant
to get involved.
Prior to the reorganization, the internal Regional delegations of authority were reviewed and
understood to be at the lowest level of authority that senior management was comfortable with
Upon completion of the reorganization, the delegations were reviewed again for appropriateness
At the time of the visit, the Team noted that the supervisor of the Administrative Management
Branch (AMBR) was directly managing contracts, grants, and finance, a total of thirty-three people
Our concern about an excessive span of control, however, was mitigated to some degree by some
novel approaches for focusing her attention on areas she thought were most vulnerable. An examnl
of this was setting up a peer review system under which staff members reviewed each other's wor^
Appendix 2b: Region-Specific Obsen/ation.	w,.„
110

-------
Management Review: Innovative Regional Structures
December 13, 1996
APPENDIX 2c
Region X, Seattle, WA
REGION-SPECIFIC OBSERVATIONS
Site Visit: September 9-10,1996
Organizational Structure Prior to October 1, 1995
Current Organizational Structure
Appendix 2c: Region-Specific Observations: Region X, Seattle, WA
111

-------
Management Review: Innovative Regional Structures
December 13, 1996
BRIEF DESCRIPTION OF THE REORGANIZATION, and STATED
INTENTIONS AND DRIVERS
The Region X reorganization retained a traditional Regional arrangement for media-based
components and created three new components, each designed to coordinate and integrate a
particular function: ecosystems and communities; innovation; and enforcement and compliance
The retention of the traditional media programs and single-point of contact managers in each of
four separate Offices (Air, Water, Waste and Chemicals, and Environmental Cleanup) maintains
the existing relationships with HQ and some other Regional programs.
Establishing two new offices, all primarily integrative in function and all directly responsive to
reinvention goals is a unique feature of this Region's approach.
•	Office of Ecosystems and Communities (OSC). Charged with the specific
purpose of implementing a "strategy ...for supporting ecosystem, geographic, and
place-based projects" like the Forest and Salmon Projects.
•	Office for Innovation (OI): Advocates and supports others in exploring
alternatives for improved environmental results. This Office also looks for
opportunities to do existing work better and more efficiently. It is the home for
many cross cutting programs such as pollution prevention, sustainable
communities, environmental justice, and other reinvention programs like Project
XL. The Organizational Effectiveness Team in OI exists to carry forward the
work of the Region's organizational change project.
Office of Enforcement and Compliance (OEC): In choosing enforcement Option 2, the Region
essentially retained what it had before the reorganization. The Region had the equivalent of
Option 2, but with a few more functions.
The Office of Environmental Assessment (OEA) keeps in place all former ESD functions As
a result of the reorganization, there is increased emphasis on "assessing the condition of the
environment" by placing responsibility for environmental indicators in OEA.
Finally, the Office of the Executive, headed by the RA, gathers functions considered critical to
the Region and gives them high visibility, including four ARAs — one for each state — and a
Tribal Operations staff.
Appendix 2c: Region-Specific Observations: Region X, Seattle, WA
112

-------
Management Review: Innovative Regional Structures
December 13, 1996
STRATEGIC PRIORITIES
This area ofstudyfocuses on how well the Regional reorgemizationhas positioned Region
X to carry out the broad, higkest-priorityareas/themes/goals/guidingprinciples outlined
in EPA's FY 1995-96 Strategic Plan, for the current andfuture work of the Agency.
COMMUNITY BASED ENVIRONMENTAL PROTECTION: Region X's community-based
program has been renamed "Geographic Based Environmental Projects" (GBEP), and is located
within the Office of Ecosystems and Communities. Some frustration was expressed with what
seems to be a continued focus on water programs, since the assigned staff mostly originated in the
water program, and defer to their program bias. In the discussion, it was clear that reorganization
intent for GBEP was for it to be a multi-media program. The staff discussion about the multi-media
prospects for GBEP turned decidedly more optimistic when a reference was made to an Ad Hoc
group they called "SWIF". SWIF - the Superfund Water Integration Forum - came about when a
longstanding watershed TMDL problem prompted coordination with Superfund. The Forum was
staff-created to coordinate the Superfund and watershed issues on a geographic basis. The GBEP
people identified with their seemingly accidental model to understand how the program would
function. Some of the struggle with clarifying the multi-media nature of GBEP may also be located
in the reorganizationestablishmentof the Office of Ecosystems, and the sifting out of the appropriate
responsibility division between the Office and GBEP. The staff also was clear that although they
like the Agency focus on geographic projects, they feel strongly that there is a time and place for
EPA's media specific programs and goals.
The Region set up a focus group with local governments to obtain a better understanding of how
they perceived this geographic program, and found the locals largely enthusiastic. Alternatively,
however, the potential Federal-local government partnership apparently created concern and
skepticism in the States, who indicated that they preferred that EPA work through them.
Additionally, the tribes want EPA participation on the geographic projects, as they are less trustful
of the States.
During this session, there was a lengthy discussion regarding the significant barrier that travel
represents for the GBEP staff in working on geographic projects. The Western States are large and
modestly populated with cities and the vast number of rural communities a long way away from each
other. The discussion was not about increases in travel allocations, but instead about addressing
bureaucratic barriers that prevent them from riding in state vehicles (perceived as potential conflict
of interest) and Regional resistance to issuing blanket travel orders which would allow staff to use
private autos to drive outside a 50-mile radius from their duty stations. No such "discretionary"
travel is possible at a time travel demands are higher because of the increased focus on GBEP. A
last question from the group was "If EPA is truly committed to community based environmental
protection, why is 50% of the staff working in Washington, D.C.?"
Appendix 2c: Region-Specific Observations: Region X, Seattle, WA
113

-------
Management Review: Innovative Regional Structures
December 13. 1996
POLLUTION PREVENTION: Region X placed the Pollution Prevention (P2) function in the
Office for Innovation as a result of the reorganization. The Region considered it important that^
not be placed in a program as a way to emphasize the cross-cutting nature of P2 Placing P2 '
one program would tend to identify it with that specific program; the intent is that eventually'Ih
perception that P2 as a program will wither, and the concept will be absorbed as an imDort
environmental tool by the various media programs. The placement of P2 in the Office for Inno
seems to be working well, and their appears to be increased interest in getting P2 better inte
into the Region's programs.
PARTNERSHIPS: Region X, uniquely, has had a significant number of Regional staff loc
on site in each of its States almost since the Regional office was created. The reorgan' r
focusing on community-based projects, has set up several place-based personnel in imDona0,
locations in addition to the State Operations Offices already in existence.
The Team's interview with the Region X States (Alaska, Idaho, Oregon and Washington)
conducted in a single conference call, rather than a series of calls with each of the States Ty?
group call was a dynamic conversation with the State participants, with a lively sense of th
common agreements and disagreements about the direction taken by the Region X office ^
The State officials were quite clear about how the Region X affected their activities On
expressed concern that the complete change in Regional personnel in the Air and Water progr C
has created confusion in the State, and made its work more difficult. His associated conce ^
that presumably due to the high transaction cost the Region will absorb, Region X may not be"!^8
to provide the support the States need, especially those with complicated projects He l
indicated that there has been a noticeable slowing in the Region's responsiveness- pressing
in voicemail frequently does not get you a staff member to provide assistance. This same offic'
stated that the slow response presents a problem for him since at times he needs a ou"v
turnaround, especially when he and his staff are working with the State Legislature
Another state official stated that the Region X Operations Offices, those located in each of th
States, are an essential asset, and he is pleased that they remain an integral piece of the Regi »
reorganization. He finds the EPA staff employed locally in his State to be much easier to wo v
with and more knowledgeable about his programs and people than those in the Regional offi
One State official, however, is concerned about the Region X Operations Office in his state which'
he says, appears to have dwindled in resources to the point where they cannot handle busine*
The roles of the Regional staff in the state offices seem confused; and need to be more function!
on serious issues in the state such as mining and pesticides. An adequate travel budget for th
Operations staff is essential to enable them to visit the sites where the local problems are TV
State has some of the largest mines in the world, and EPA employees need to be able to travi
there to see and experience them in person. The staff suffers something of a credibility proble
in the State when they are asked if they have actually seen the problems they are talking about and
have not. Travel in one of the Region X States is extra-critical since the state is so big and o
can really only get around by flying.	' ne
Appendix 2c: Region-Specific Observations: Region X, Seattle, WA
114

-------
Management Review: Innovative Regional Structures
December 13, 1996
Two of the State officials agreed that Region X did a good job of keeping them informed as their
reorganization plans developed. The reorganization presented problems in distracting the
Region's attention from environmental work for several months while being implemented, but the
situation has recently improved. One State official agreed that he had a lot of communication, and
said that he has a good relationship with the Operations staff. One result of the reorganization
is that the Operations staffs located in the States now report to Seattle program offices instead of
a local office manager. Another State official has noticed quicker responses to program-related
questions due to this reporting change, although there also has been some loss of project-level
focus.
We talked with representatives from Tribes in Alaska, Idaho and Washington. They were at least
vaguely aware of the reorganization and some of its attributes, but were largely bystanders. They
learned about the reorganization from their contacts in the State Operations Offices. They felt
well informed of the establishment of the Tribal Operations Office within the Office of the
Regional Administrator, an important symbolic location for them. The reprioritization of Indian
programs in the Region was more important to them than the reorganization itself.
The Tribal Operations Office itself is managed by two co-leads, both named Kathy, which the
Tribal officials found very confusing. They also find the contact points in Region X to be
confusing and are not sure if they should work with the Tribal Coordinator or the program. They
would like to feel free to work directly with the programs, however, they do not have those
relationships established, and feel like the program staff generally does not know how to work
with the tribes. This results in them working with the Tribal Coordinator. They see the Region
X staff generally as not understanding the Tribes, and relying on the Tribal Operations Office to
resolve problems. They believe the Regional staff could benefit from training to ensure across-
the-board awareness of tribal issues. The tribal representatives emphasized that their staff
relationships are very important; moving Regional staff around upsets those relationships and
requires them to spend scarce time and energy to begin a new education process with the staff
replacements. They emphasized, again, that it is essential that the Region maintain a level of
service, otherwise there is inconsistency and loss of credibility.
The Tribal officials we spoke with feel that The Tribal Operations Office is providing pretty
consistent service, which is less consistent in the rest of the Region. At the time of the interview,
the tribal representatives did not have a current phone numbers for their contacts. Overall, they
indicated that they saw little change in the Region to justify the amount of gridlock they
experienced during the reorganization. They saw a lot of inefficiency due to moving around so
many managers, with a steep learning curve for the staff that will prevent a speedy education on
Indian programs.
• Performance Partnerships One State official stated that he and his staff are
having a difficult time with their PPA. Their PPA was negotiated based on last
year's funding, but EPA support for their programs is not there, either Regionally
or nationally. The State is expecting grant reductions of about $750,OCX), but EPA
is not removing things from the PPA as needed to help the State absorb those cuts.
Another State official stated that Region X management has been very supportive
Appendix 2c: Region-Specific Observations: Region X, Seattle, WA
115

-------
	Reaional Structures		 December 13. 1996
Management Review. Innovativej^y—						
f pp a hut the support tends to evaporate at the program level, such as
^Tw^^sSio» 319. This person sees the Regional off as afraid of
. , Tr__r General findings; so with the staff so risk averse, n seems clear
thaUhe hurdles to changing the way the Agency does business with the PPAs have
ii wn rpmnved. He also finds the PPA process as far more painful than
not rea y	EpA Agreement process; the PPA is astronomically time-
t e previ	^ States generally indicated that they see the Ppa process
overalUoShave been beneficial, as it bonded the State's programs together. They
do not think Region X got the same benefit.
One State official commented that the Region X staff seems to be in need of a
d' shift" as they continue to micro-manage the State's achievement of its
ParV?f ' the IG as their scapegoat to justify their approach. An official
f J ^ Jsmte saM that the Agency needs a clear definition of flexibility. He
hasheard the Administrator and the Associate Administrator, OROSLR, talk about
the flexibility in the Performance Partnership program, but finds the PPAs to be
less flexible than the program grants were before. EPA needs to consider that
"one size does not fit all": that the eastern States have larger populations and tax
bases and are working on more sophisticated programs than the Western States,
which are still working on the basics.
• Tribal Environmental Agreements (TEAs): There was a varied response from
the tribes on the TEAs. One Tribal official sees them as being positive and
effective in ensuring a governmental relationship, but another official said he did
think the TEAs accomplished anything beyond current policy that required
signing an agreement over. He would like to see EPA prove it will implement
Indian policy, and that he is holding the Agency accountable for what is already
igned One representative suggested that he would like to see the EPA programs
n the same cycle. He still has not heard about the Environmental Education
grants- and it would be useful to hear about all the programs at the same time. He
wants Region X to push the block grant concept.
ENFORCEMENT, COMPLIANCE, COUNSELING AND ENVIRONMENTAL JUSTICE;
Reeion X choose' Enforcement Option 2 when reorganizing, maintaining an enforcement
coordination office and discrete enforcement units within the program offices. In the Air Office, the
enforcement function is further split among several units. The Office of Enforcement and
Compliance Coordination is responsible for coordinating multi-media enforcement activities,
tracking enforcement measures, negotiating MOA's with HQ. It is currently staffed with 5
emolovees and includes an enforcement strategic planner and Federal facilities program oversight
T wT Enforcement does not seem to be one of the driving forces behind the Region's
reorganization. In fact, some employees believed that the first reorganization proposal did not
include an enforcement office.
We heard numerous times that Regional leadership has given no clear and consistent message about
the priority and role of enforcement m the Region. This lack of clarity has created major confusion
Appendix 2c: Re9l^S^moB^ationS:	X, Seattle, WA
11ft

-------
Management Review: Innovative Regional Structures
December 13, 1996
among staff. There are many who believe that the Region has disinvested in enforcement, and the
number of FTE devoted to enforcement has been reduced since the reorganization. This belief was
echoed by a headquarters concern that resources are incrementally shifting from enforcement to new
program initiatives over time, and a concern that the Agency will not be able to explain this to
Congress.
The Region feels that they are making improvements in compliance to reduce non-compliance and
to improve environmental results. However, OECA's data collection and measurement systems do
not track these results, and therefore do not tell the Region's compliance and enforcement success
stories.
The Region is also experiencing conflict between enforcement and compliance assurance. Often the
inspectors see a problem as a violation, while the technical staff disagree. This may be the cause of
inconsistencies in enforcement practices, which are causing problems and confusion with the States,
and distrust among the regulated community. We also heard that Regional managers might be
inclined to not focus on enforcement in order to meet the Region's goal of improved partnerships
with the States.
Counseling: ORC resources, like enforcement resources in the programs, have been siphoned off
by new initiatives. Since the reorganization, ORC perceives that resources have been devoted to
fund initiatives, such as the Office for Innovation. At the same time these resources are declining,
the need for counseling resources is increasing. The ORC attorneys, since they maintained their
program expertise, are seen as a foundation of program knowledge for those programs who lost
expertise during the people placement process, and spend a great amount of time training new
program staff. This Region currently has the lowest attorney to client ratio of any Region.
Environmental Justice: The environmental justice program is located in the Office for Innovation
as part of the Region's intent to integrate this program into the major program offices in the long
term. Although we heard that there is a current focus primarily on large facilities, the program has
outreach efforts and EJ grants which target many small and rural communities, including some
tribes.
REINVENTION PRIORITIES
This section focuses on how well the reorganization has positioned Region X to achieve
the Agency's reinventiongoab: Shared Vision and Values; Customer Focus; Diversity;
Working Collaboratively: and Streamlined and Strengthened Organizational Design.
Appendix 2c: Region-Specific Observations: Region X, Seattle, WA
117

-------
Management Review: Innovative Regional Structures
December 13, 1996
Before reorganizing, the Region began by defining its core work processes. It then d '
organization to best address them. It was also driven by the need to achieve a supervi ff ^
of 1:11, and the Regional Administrator felt it was time to look at the role of the R ^ nfvr ^
given the changes occurring externally - with the States in particular. The Region does have
espoused value of partnership with the States and tribes, which is evident through th ^ StFOn^
of four State ARAs and two Tribal Office staff within the Office of the Regional AdminTstraT16111
The Region also sought to broaden its existing areas of excellence, especially a stro
community relations that it had developed in the Superfund program and wanted to extendR1^
wide. The Community Relations and Outreach Unit was created in the Office 0f p ^ e£10n"
extend the type of support the Superfund program enjoyed to the entire Region R ° ^ t0
created an Outreach Forum, a cross-organizational group tasked with finding and co 6 j'0" • a'S0
meaningful ways to work with and educate external customers.	on
Although the Regional managers and staff clearly understood these drivers, there was
articulated shared vision expressed and heard during our visit.	'	n° ° e ^
The Region also used the reorganization to increase diversity in the supervisory ranks add'
supervisors, and articulated this goal for the Executive Team as well.	'	nevv
• Processes for Reorganizing In January 1995, the Region formed an Organization
Design Team of about 15 cross-organizational staff. Assisted by an organizational
change consultant, the ODT examined the key functions, and "value added
activities". It then determined the Region's core processes through feedback from
surveys of customers and employees, a business inventory, strategic plan and a
Regional vision. Using these core processes, "the important categories of work that
produce desired environmental results", it designed an organizational structure that
incorporated these with other reinvention goals. To make this design a reality the
Region designated an Implementation Team to look at various activities associated
with implementing the reorganization^ Infrastructure Team to manage the logistics
of moving people and computers to be in alignment with the new structure and
People Placement Team to move people into new jobs.
We received consistent feedback that the Region was very open in communications
and that senior managers were honestly interested in feedback about the
organizational proposals during the process. The RA personally received and read
more than 400 LAN messages from employees about the reorganization The
reorganizationteams held panels, open houses, and scheduled one-on-one feedback
sessions to inform, educate, and hear feedback from staff on the proposals and final
design. They held training on change and transitions, held career management
sessions for supervisors who were making choices about the future jobs, and have
continued to ask the organizational change consultant (an intermittent EPA
employee) for on-going professional assistance in the transition.
Appendix 2c: Region-Specific Observations: Region X, Seattle, WA
118

-------
Management Review: Innovative Regional Structures
December 13, 1996
The infrastructure issues were underestimated by the Region initially. It recognizes
now that it should have been more clear about the time these activities would take,
the disruption they would cause, and the impact that these activities would have on
the on-going business activities. The logistical costs associated with establishing
place-based offices were astronomical and unanticipated by Regional management.
• "Assignments, Not Positions:" This motto was adopted by the People Placement
Process Team to create in staff a new paradigm of looking not at what position one
holds, but at what assignment you have at any point in time. The stated intention is
to rotate almost all senior staff and managers every three to six years.
The Process was designed to first reduce the number of managers and assign these
managers into the new Unit Manager positions or into other senior non-supervisory
positions. Each existing manager had the choice to design their own assignment in
the new organization, or to identify 3 positions from an identified list of Unit
Managers and other identified senior positions and apply for them. Once the Unit
Manager jobs were filled, any eligible staff person could compete for the remaining
positions. The existing supervisors could also compete for the Executive Team
positions.
The announcement of the September30,1995, deadline created a urgency that forced
the process to be conducted more quickly than some desired, although we heard that
this may have been positive in that it kept things moving. One drawback of the
deadline is that the placement process for staff was very rushed, with some
employees only having 24 hours to make a significant career decision.
As mentioned previously, the Region intends to rotate some of the managers and
senior staff employees every three years. Given the experiences we heard about the
impact of losing senior employee program expertise and the increased production
costs associated with many people learning new programs, that process should be
carefully planned and managed so as to make sure the Region maintains program
expertise and continuity within each program.
The Regional commitment to continuous improvement is clearly demonstrated. The
Office for Innovation is sponsoring a mid-course assessment of the reorganization
in keeping with the intent to periodically evaluate the major areas they invest in and
identify any mid-course corrections. This process had just begun at the time of our
visit. The Region has selected members of the assessment team specifically not to
include anyone who was part of the original design and reorganization process to
ensure objectivity and reflect a cross section of the organization. The Office for
Innovation is also working to develop long term measures of success for the Region's
organizational change process through a Workgroup called the "Organizational
Change Progress Indicators Project."
Appendix 2c: Region-Specific Observations: Region X, Seattle, WA
119

-------
Management Review: Innovative Regional Structures
December 13, 199R
•	Organizational Design: In designing the organization to meet the reduced
supervisory ratio, the Region chose to eliminate the Branch Chief level, and now has
iust one layer of supervisors (Unit Managers) below the Executive Team. Getting
to 111 has in effect meant the creation of organizations of 1:20 or 1:25 in most
cases They have a strong structural support for customer service, being the only
Region to have operations offices located in each State, and added several place-
based staff in other locations throughout the Region during the reorganization. Hiey
organized around their core processes, and are apparently working on 3-4 process
redesign activities right now.
Regional leadership's intent is for this organizational structure to be flexible and
dynamic to adjust to new initiatives as they come along. The Office for Innovation
seems to be an excellent structure to support that goal, providing a fertile ground for
new programs to be fleshed out and then integrated if appropriate into the program
organizations. Although the changes created by the transition and the movement of
staff into different program areas created higher transaction costs in the short term,
they expect higher efficiency and increased program effectiveness in the long term.
•	New Ways of Operating and Redefined Relationships The Region is also
committed to managing change effectively and developing that capacity. The Office
for Innovation includes an Organizational Effectiveness Team which has a network
of internal and external consultants available to assist in the continuing change
efforts.
As many of the Regions have found, the impact of the move to 1:11 has been
substantial Larger spans of control require an emphasis on empowerment, and the
Region is still working to define a common definition of empowerment and then
build managers' skills in coaching to support this new way of doing business. The
Region has developed a good Decision-Making Model to assist in the definition of
empowerment. They have also developed a statement of belief that "every employee
is a leader" to encourage staff to take on more of a leadership role and accountability
for the work they do.
The shift of employees and supervisors into new program areas means that
employees are at very different readiness levels for taking on empowerment as well.
Supervisors are so stretched that they are unable to spend enough time working with
employees, which is fine for those employees who stayed in familiar program areas,
but very difficult for those in new programs. The Unit Managers are having a
difficult time trying to balance the policy work and coordination with HQ that was
previously done by Branch Chiefs in addition to the "care and feeding of staff' and
the front line production work of first level supervisors.
The Executive Team has made great investment in working together as an effective
team. They have built their skills in teamwork, and have worked collaboratively on
resolving many of the issues that have resulted from this new organization.
Appendix 2c: Region-Specific Observations: Region X, Seattle, WA
120

-------
Management Review: Innovative Regional Structures
December 13, 1996
However, the staff and Unit Managers see a widening gap between the Executive
Team and the rest of the organization, and are concerned that they are doing more
policy development work than they see as appropriate at that level. It was suggested
that they may need to reach out more into the organization so as not to become too
isolated and out of touch. One skill area identified by the Executive Team to develop
is to better target disinvestments as the new programs and priorities continue to
increase.
Many of the former supervisors are currently in non-supervisory program
management positions. These positions have functional responsibility to work with
many others in the Region, yet they have no positional authority to direct the tasks
of others. We heard that matrix management is a cornerstone to the new
organization's success, however, there is confusion on how to operate in this
structure effectively. The Organizational Effectiveness Team has tools to assist with
that learning, yet they are not taken advantage of consistently.
Another concern raised about the senior positions is a resentment on the part of lower
graded staff that these positions have created a cap on any career growth, and that the
senior technical employees now have the "plum" assignments and projects. On the
other hand, there is also a sense on the part of some staff that those employees are not
performing up to grade level and that some of these jobs are "make work" positions.
Although the Region is making progress in moving to a more team-based
organization, the process is slow and deliberate. As one person said "it is hard to
impose our old timetable for accomplishing things on this new way of doing
business." The Region has demonstrated a resource commitment to teams. They
have created a teaming cadre which works to train and consult with teams, and are
investing up-front in design work to form or reform teams in a purposeful and
intentioned manner. The Organizational Effectiveness Team also provides conflict
management and facilitation support to teams. However, even with this support there
is still cynicism and a lack of a clear definition of teams in the Region.
ACCOUNTABILITY AND INTEGRITY
This section focuses on how well the reorganization haspositioned jRegionX to establish
appropriate organizational structures, policies, and procedures to provide reasonable
assurance that the goals/objectives of Agency senior leaders are carried out effectively,
efficiently, and in compliance with applicable laws, regvlatkms and central agency
guidance.
Appendix 2c: Region-Specific Observations: Region X, Seattle, WA
121

-------
Management Review: Innovative Regional Structures	 December 13, 1996
RESOURCE AND MANAGEMENTINTEGRITY: Resource Focusing was identifiedby Region
X as one core process during the analysis of core processes in the early stages of reorganization
planning. In doing so, they intend to emphasize more conscious resource and accountability choices
to program direction in the future, and intend to increase the focus on accountability in the
organization, starting with the RA. FMFIA leadership also resides in the Resource Focusing
function which should be a good fit with the increased focus on accountability. This focus will be
similar to the new PBA function in HQ, which should provide good linkage for those functions
They have designated one of the Region's priority hires for the PBA/Resource Focusing activity
This is one area that shows great promise for the Region.
In the reorganization effort, the Region has made some improvements in accountability for specific
financial programs. They have made system changes in the grants process so that Office Directors
and Unit Managers are more visibly accountable in the sign-off process.
The reorganization also had impacts on the structure of the budget, finance and grants functions
which were previously all located within the Comptroller's Office. The Comptroller position was
eliminated in the reorganization. Now, budget and finance functions are located within the Finance
Unit, and Grants is a separate Unit, both reporting directly to the ARA.
Although not directly attributable to the reorganization, the Finance Unit has operated down 30%
in staff this year, and the stress is starting to show. There is an apparent fierce level of pride within
the staff, they demonstrate good quality control and use the core financial measures to assess their
processes. However the lack of staff may be attributing to some quality issues, and little focus on
planning ahead and analysis.
Due to the highly unusual budget year, it is difficult to assess the other impacts. Most
reorganization-based concerns are seemingly minor and will be worked out with time. Because there
are several more units created by the changes, the Region has added 5 new responsibility centers
(RCs). This has created a need to spend more time training new staff in both budget and finance
program operations. Also, due to the change in reporting relationships with the Operations Offices
and the new place-based staff, time cards must be shuffled in Seattle to get them to the proper Rc'
PROGRAM ACCOUNTABILITY: Region X seems to be managing the charging of multi-media
program efforts to the correct program elements well. They make use of multiple FANs when
appropriate, and feel that they are more aligned with the approach that the IG has championed in
reviews of other Regions than most Regions. Multi-media work is mostly accomplished by having
multiple people - who are usually each a media specialist - on a team. Contract dollars are clearly
traceable to program accounts and they reprogram funds to BJ1 accounts when work is truly multi-
media in nature.
Ar inherent difficulty created by the reorganizationrelates to the tracking of costs for the Operations
Offices. The accounting set-up makes it nearly impossible to pull actual costs due to staff reporting
to different programs in Seattle. More than one RC may be supporting an individual - e.g., program
funds for salaries, operations office funds for travel and other expenses.
Appendix 2c: Region-Specific Observations: Region X, Seattle, WA
122

-------
Management Review: Innovative Regional Structures	December 13, 1996
Headquarters program office concerns about locating program specific resources should be
minimized due to the "hybrid" approach Region X took. Since there are media specific programs
within the Region in addition to the more multi-mediaprograms, the cross-walk for resources should
be less complex.
Appendix 2c: Region-Specific Observations: Region X, Seattle, WA
123

-------
Management Review: Innovative Regional Structures
December 13, 1996
Appendix 2c: Region-Specific Observations: Region X, Seattle, WA
124

-------
Management Review: Innovative Regional Structures
December 13, 1996
APPENDIX 2d
Region V, Chicago, IL
REGION-SPECIFIC OBSERVATIONS
Site Visit: September 17-19,1996
Organizational Structure Prior to October 1,1995
Current Organizational Structure
Appendix 2d: Region-Specific Observations: Region V, Chicago, IL
125

-------
Management Review: Innovative Regional Structures
December 13. 1996
BRIEF DESCRIPTION OF THE REORGANIZATION, and STATED
INTENTIONS AND DRIVERS
Region V retained a media-based structure in its reorganization. The primary driver or intention was
to maintain consistency with the Headquarters Offices. The other significant factors or drivers were
to meet the 1:11 supervisor/staff ratio and to address enforcement per the Administrator's guidance
The reorganization made a number of shifits/changes/modifications in terms of how media and
programs were arranged. The most significant changes include the following:
•	Eliminated the Planning and ManagementDivision (PMD) and created the Resources
Management Division (RMD), which incorporates most of the existing PMD
functions.
•	Eliminated Environmental Services Division (ESD) no longer exists. All of the
ESD's functions are incorporated into other Divisions or Offices. RMD specifically
incorporates ESD's Central Regional Laboratory, the Cleveland field office, and
"core" quality assurance monitoring and inspection functions. The project-level QA
functions are incorporated into each of the media divisions.
•	Waste Management Division was separated into two Divisions: Superfund Division
and Waste, Pesticides, and Toxics Division.
•	The reorganized Air and Radiation Division has enforcement responsibilities and
incorporates additional inspection and monitoring functions from ESD. The
Enforcement Branch has responsibility for all media and multimedia enforcement
and compliance functions.
•	The Water Division structure flattens the organization by eliminating two layers.
Most of the Division's enforcement functions are consolidated in the Enforcement
and Compliance Assurance Branch.
•	The Office of Regional Counsel's (ORC) new structure realigns ORC into two
multimedia branches and eight sections.
•	Since media-based Divisions were continued, the Region was able to maintain the
integrity of small programs by keeping them intact within the new structure.
Region V created new organizations that report directly to the Region's senior management. These
include:
•	The Office of Strategic Environmental Analysis (OSEA) serves the Region's Senior
Leadership Team (SLT) by providing information, analysis, and a wide range of
strategic planning support including risk assessment, peer review, development of
Appendix 2d: Region-Specific Observations: Region V, Chicago, IL
126

-------
Management Review: Innovative Regional Structures
December 13, 1996
environmental goals and indicators, and conduct of National Environmental Policy
Act (NEPA) analysis.
• Under the Regional Administrator's Office, the Office of Enforcement and
Compliance Assurance (OECA) provides an organized and centrally identifiable
enforcement coordination contact.
• Also under the Regional Administrator's Office, the Office of International Activities
(OIA) serves the Region in all matters that apply to internal activities except for the
relationships already established between the Great Lakes National Program Office
and the Canadian government.
The Region chose to address 18 multi-media, crosscutting strategic priorities and places by
establishing formal Regional Teams headed by a full-time Regional Team Manager (RTM). The
RTMs report to the SLT, with individual SLT members serving as "sponsors" for the teams. These
positions are the GS-14 level (with one exception—one RTM position is a GS-15).
Greater Chicago
Southeast Michigan
Common Sense Initiative
Sediments
Lake Superior
Enforcement & Compliance
Assurance.
Gateway (St. Louis area)
Northeast Ohio
Pollution Prevention
Lake Michigan
Tribal
Brownfields
Upper Mississippi
Northwest Indiana
Toxics
Lake Erie
Crandon
Environmental Justice
STRATEGIC PRIORITIES
This area of study focuses on how well the Regional reorganizationhas positioned Region
V to carry out the broad, highest-priority areas/themes/goals/guidingprincipUs, outlined
in the Agency's FY9S-99 Strategic Plan, for me curreru andfuture work of the Agency.
The Region chose to address multi-media, crosscutting strategic priorities by establishing Regional
Teams. In this section, the overall Regional Team approach to addressing strategic priorities is
discussed. The succeeding sections will focus specifically on four strategic priorities—CBEP,
Pollution Prevention, Partnerships, and Enforcement.
Appendix 2d: Region-Specific Observations: Region V, Chicago, IL
127

-------
Management Review: Innovative Regional Structures
December 13, 1996
The success of the Region V reorganization may rest on how well the Regional Teams with RTMs
approach works. If this approach works well, the Region will have succeeded in melding the dual
goals of a media based organization with the capability to address multi-media, cross-cutting Agency
and Regional priorities. The subject of these teams was raised by nearly all the various groups
interviewed. Overall, the most significant observations include the following:
•	Resources: Several RTMs expressed frustration over resource issues. The RTMs
were provided with Divisional point of contacts, called "windows", who work with
Divisional management and staff to provide support to the Regional Teams. The ad
hoc nature of this arrangement is not necessarily a problem if the RTM is creative at
corralling and procuring resources, and if the "windows" designated were strong
actors. Since these factors did not exist on all the Regional Teams, some teams are
struggling. The SLT is attempting to address this by recently asking for work plans
and resource needs from each Regional Team. These plans are currently under
review by the SLT and the Resources Management Committee.
Another resource issue concerns the demands on small offices with this regional team
approach. The review team received comments from offices such as the Great Lakes
National Program Office and the Office of Public Affairs in which they outlined the
difficulties with participating appropriately on all the various teams. Individuals in
these small offices, in a number of instances, are assigned to serve on several teams,
and they are concerned with how they balance their team work with their other
assignments.
•	Management Attention: The SLT wanted to increase the profile of Regional Teams
by having the RTMs report to the SLT rather than specific Division Directors. The
SLT clearly wanted RTMs to use self initiative and to feel empowered to go in
whichever direction was most appropriate and effective, and the SLT would be there
to support them. The SLT is still struggling and sorting out how they appropriately
support the Regional Teams. Some RTMs feel that they essentially report to their
SLT sponsor, rather than the Region-wide SLT. The SLT, through how it operates
vis-a-vis the RTMs and through its decisions regarding resources, will have a critical
impact in terms of how effective the Regional Teams become.
•	Internal Communications: There is a significant amount of uncertainly about the
Regional Teams, particularly among staff. Some of the "windows" believe their
team-related work is not fully taken into account, that their supervisors still only
appreciate their program-related work. It does not appear that the performance
appraisal process has been fully worked-out regarding team-related activities. Many
comments were received concerning uncertainty about how supervisors would take
team-related work into account in the performance appraisal process. Also, the
reason why this set of priorities was chosen to have Regional Teams and RTMs is
unclear to staff.
Appendix 2d: Region-Specific Observations: Region V, Chicago, IL
128

-------
Management Review: Innovative Regional Structures
December 13, 1996
The creation of Regional Teams, with RTMs, imposed a matrix management structure. The
relationships between the Teams and the media-specific Divisions have underlying tensions. The
SLT has committed to focus its attention to resolve these issues. Another, separate tension, is due
to the eventual upgrading of RTMs to grade 14.
COMMUNITY-BASED ENVIRONMENTAL PROTECTION (CBEP): The Region has a
CBEP Workgroup that developed the action plan for the Region's approach to CBEP. Prior to the
reorganization, the Workgroup had interviewed staff and managers within the Region to determine
how to get community-friendly tools in the hands of those who need them. With the reorganization,
the Workgroup is reevaluating the CBEP program's approach.
While the CBEP Workgroup is addressing overall issues, the Region through the reorganization
established ten place-based Regional Teams. This appears to be a substantial and significant effort
to implement CBEP. It is clearly too soon to tell how effective this approach will be. Regional staff
and State interviews included comments which indicate some of these new teams show promise
while others do not. A critical test of the concept is imminent, since the Resources Management
Committee (and perhaps ultimately the SLT) is reviewing proposed work plans, with resource
investment options, for each of the Regional Teams.
POLLUTION PREVENTION (P2): The Region is addressing pollution prevention through a
Pollution Prevention Regional Tearn. The RTM also serves as the pollution prevention coordinator.
The team manager has SLT sponsorship from the Director of the Waste, Pesticides and Toxics
Division.
This approach for addressing pollution prevention appears to be working, and is enabling the Region
to address this Agency strategic priority. The P2 Team is operational and has some
accomplishments to date.
PARTNERSHIPS: The strategic priority of partnerships is being addressed by Region V through
the following:
•	A team was created to address tribal issues. Additionally, the Region has three tribal
liaisons in the field.
•	During this past year, the Region established a NEPPS (National Environmental
Performance Partnership System) workgroup, with representatives from each
program and the Great Lakes program. Apparently, one outcome of this group's
work was to establish separate teams to negotiate PPAs and PPGs with the States.
Each Division has a State assignment and a team. The Office of Strategic
Environmental Analysis (OSEA) was designated as the overall point of coordination
for Regional efforts on PPAs/PPGs.
The States: Comments from one State indicate that the Region has not accomplished some of its
fundamental goals for reorganizing such as streamlining and becoming more cost-effective. In
particular the team approach and matrix management structure are causing concern relating to
Appendix 2d: Region-Specific Observations: Region V, Chicago, IL
129

-------
Management Review: Innovative Regional Structures
December 13, 1996
programs that have had a long history of being State delegated programs. The Regional Teams are
being viewed as interference. The participant stated that the State and governor liked the overall
concept of PPAs and PPGs however they were not planning to participate in 1997. Their
preliminary concerns were that the two concepts (PPAs and PPGs) would become intertwined and
that the PPAs create layers of additional requirements that the State can not afford to invest. PPAs
would require additional reporting requirements and new measures which would result in investing
additional human resources.
Another State suggested that the Region reorganized as a way to respond to the criticism the Regions
were receiving regarding their poor partnering with States. The official commented that their
relationships have been good with Region V and continue to be that way. He has noticed some
recent tension, but he thinks that it is simply a reaction to change and will dissipate over time. He
did express some concern about the Region's PPAs and PPGs. He stated that management had
committed to more flexibility in these programs, but that the staff exhibits little change. He
expressed concern regarding the Agency's concept that "one size fits all". He suggested training for
EPA staff as well as State personnel.
The last State participant commented that she thought the Region reorganized to facilitate a team
approach to doing business and improve its ability to handle cross-program issues. She thinks the
team approach provides her State with a point of contact for specific issues, which is important to
this State. She would like to see the Regional Office Public Outreach staff work better with the
State. Due to the lack of coordination with the Region's Public Outreach, the Region and the State
have released inconsistent messages to the public. She is concerned that these inconsistencies will
confuse the public and create distrust of the Government. She would like to see PPAs and PPGs
integrate programs and allow a more holistic approach to environmental protection rather than a
media-specific approach. However, the Region's reorganization has not demonstrated any change
in their approach.
It is not possible to determine or sort out very precisely which of the State concerns regarding PPAs
and PPGs are derived from the Region organizational structure, and which are part of the broader
difficulties faced by the entire Agency to move forward with these new approaches. Region V does
appear to take very seriously the area of PPAs/PPGs as a strategic priority, and is taking actions to
be more responsive and to have a more coordinated approach. It is too early to tell whether the
recent designation of OSE A to coordinate in this area will satisfactorily address the various concerns
ENFORCEMENT, COMPLIANCE, AND COUNSELING: The Region addressed the strategic
priority of enforcement by making a number of changes in the organization, and by creating several
new units and teams:
• Established an Office of Enforcement and Compliance Assurance (OECA), that
reports to the Deputy Regional Administrator. OECA serves as the principal contact
with the National Office of Enforcement and Compliance Assurance as well as the
Region V States and Tribes. OECA has the Regional Enforcement Coordinator and
3-4 staff members. The Coordinator chairs the Region's Civil and Criminal
Appendix 2d: Region-Specific Observations: Region V, Chicago, IL
130

-------
Management Review: Innovative Regional Structures
December 13, 1996
Enforcement Screening Committee, and serves as the Regional Team Manager
(RTM) for the Regional Enforcement Management Team.
•	Created the Regional Enforcement Management Team to handle policy, planning,
and cross-cutting issues;
•	Maintained and created enforcement branches in each media/program office;
•	Office of Regional Counsel (ORC) reorganized into multi-media units.
At a minimum, this new approach does seem to be offering better coordination and communications
with Headquarters. Also, the Regional Enforcement Management Team appears to be addressing
cross-cutting Regional enforcement issues (such as PPAs/PPGs) while prior to the reorganization
such issues were not consistently addressed. It was not possible to determine, however, the specific
and tangible benefits and/or new ways of doing business that could be attributable to the new Team.
While there may be better communications, no examples were provided of how the work of the
Team had given the Region stronger, more multi-media operations and results.
Two other points should be noted. First, there was some adjustment necessary to incorporate the
ESD inspectors into the media Divisions. But there is optimism that this change will result in more
persons available and capable of doing inspections. Second, the ORC moved away from having
attorneys specialize in a media to having a random assignment process. While most attorneys are
said to like this approach, the Regional clients are expressing frustration of having to work with
attorneys that are new to their media programs.
REINVENTION PRIORITIES
This area focuses on how well the Regional reorganizationJtas positioned Region ¥ 10
comply with EPA's reinvention guidance and achieve the Agency 's reinvention goals:
Skated Vision and Values; Customer Focus: Diversity; Working Collaboratively;and
Streamlined and Strengthened Organizational Designs.
• Processes for Reorganizing: The Region V approach started in 1993 when the
Regional Administrator chartered a Region-wide Streamlining Task Force. This
group's work resulted in the February, 1994, "ReinventingRegion V" plan submitted
to the Administrator. The plan recommended that the Region establish a workgroup
to evaluate what the optimal regional organization should be. In August, 1994, the
Regional Administrator convened the Optimization Task Force (OTF) to study and
recommend operational and organizational changes. In March, 1995, the Region's
Appendix 2d: Region-Specific Observations: Region V, Chicago, IL
131

-------
Management Review: Innovative Regional Structures
December 13, 1996
final organizational proposal was outlined in the Region V Reinvention
Implementation Plan.
Region V senior management described a process in which a lot of work went into getting
staff and stakeholder input. Internally, town hall type meetings were held. The States did
not raise any significant concerns with how the Region did or did not include them in the
process.
The implementation of the reorganization has faced some difficulties, much of which can be
attributed to the Agency deadline of September 30, 1995, to implement reorganizations.
—	The placement process was not clear. Staff and managers effected by
the reorganization could indicate preferences. A staff comment was
that "the intent was good, but their [management's] execution was
poor." Due to time constraints, only one round of preferences for
positions was done—when new openings after the first round
appeared, another preference process was not held.
—	Significant problems from filling Regional Team Managers positions.
Given the hiring and promotion freeze back in August-September,
1995, Region V management reassigned people into the RTM jobs,
using the preference survey process, at each persons existing grade
level. The Region is now upgrading all the RTM positions to GS
14s. These are being filled through the merit promotion process.
—	Problems with the placement process may have contributed a small
number of formal grievances and to the vote to establish a union in
the Region this past summer.
More generally, communications could have been stronger about why there was a
reorganization and why this approach was chosen, i.e., an overall vision. Interview
comments indicated that the only apparent driving force people felt was the 1:11
supervisor/staff ratio. It appears that there is still some confusion surrounding the
decision about the Regional Teams.
It appears that the SLT is discussing and working to address some of the lingering
and new problems with implementation of the reorganization such as resources for
Regional Teams and the placement/upgradingof RTMs. They are also working with
a management consultant to continue to monitor effects of the reorganization and to
understand areas needing adjustments. There are a number of issues that do not seem
to have a place to be resolved and addressed—further increasing of empowerment,
support for teams, span of control, new role of the supervisor, etc.
• Shared Vision and Values: The Region's Reinvention Plan addresses shared vision
and values as follows:
Appendix 2d: Region-Specific Observations: Region V, Chicago, IL	~~ '
132

-------
Management Review: Innovative Regional Structures
December 13, 1996
"The Region V vision, mission, and values will serve as our guideposts for the
reinventing work to come. Specifically, the Vision/Mission/Values statement will be
actively used by the SLT in establishing its yearly priorities, its cross-regional teams,
and its deployment of resources, as well as, being used on a daily basis to guide
important policy and implementation decisions."
No references were made to the Vision/... statement by management or staff It is
possible that the Vision/.... is being used as stated above, but nothing was noted to
the review team in that regard.
•	Customer Focus: In the Customer Focus area, comments were received that some
of the place-based Regional Teams were effectively serving as point of contacts for
those communities. Also, the Region has a Customer Service Workgroup, with
members from across the Region, and with sponsorship by the Director of the Waste,
Pesticides and Toxics Division. During FY 1996, that workgroup held four major
meetings between Region V and external customers (large industry, small businesses,
environmental groups, local governments) to listen to their needs and to gain their
input for improved customer service. The workgroup distilled the results of those
meetings and made 25 recommendations for action to the Regional Administrator.
•	Organizational Design: As noted earlier, the most significant organizational design
element in Region V was the decision to create regional teams with full-time, team
managers.
•	New Ways of Operating and Redefined Relationships: This section is intended
to describe efforts to achieve the 1:11 supervisor/staffratio, promote empowerment,
use teams, redefine management behavior, and bolster morale, and the effect —
cumulative or individual — of these new ways of operating.
In Region V, the strongest, and most consistent feedback and comments revolved
around the new Regional Teams and the fact that 1:11 supervisor/staff ratio was a
driving force for the reorganization. The Region's major initiative involved Regional
Teams. The issue of Regional Teams is discussed in a previous section of these
observations (II. Strategic Priorities). As has and will be noted elsewhere, from an
Organizational Design standpoint, the key elements to long-term success of the
reorganization will be how well the Regional Teams will work.
A significant observation in the Management Behavior area is that senior
management believes the SLT is evolving as intended. The SLT was created to help
senior management move from a Division focus to a Regional view, with attention
on the strategic environmental and organizational issues confronting Region V. The
Resources Management Committee (RMC) is intended to relieve the SLT of
operational issues.
Appendix 2d: Region-Specific Observations: Region V, Chicago, IL
133

-------
Management Review: Innovative Regional Structures
December 13, 1996
Another part of Management Behavior was a commitment to rotate two or three
Division/Office Directors. Senior management explained that they feel this was
achieved (through the splitting up of the old Superfund/RCRA Division, and filling
a Division Director position due to retirement). However, a number of staff noted
that it did not "feel" like the SLT fulfilled its commitment, in particular with the SLT
members.
In addition, there are other issues that were identified that relate to "new ways of
operating:"
—	There were some concerns expressed, by managers and staff, that the
span of control in some units as a result of the 1:11 supervisor/staff
ratio is too great.
—	The role of the supervisor is unclear, and there does not appear to be
a new vision shared and understood across the Region. In one sense,
supervisors felt the supervisory jobs were being devalued relative to
the new Regional Team Managers. Additionally, there was a feeling
expressed that the supervisory jobs were being described as
undesirable jobs (signers of timecards, etc.).
—	Progress on increasing "empowerment" is at best uneven. First, staff
and managers did not have any great sense that layers were reduced.
Rather, some felt that the new Regional Teams imposed an
additional, new layer onto the organization. Second, staff felt it was
the same as before—some managers are great at encouraging and
fostering empowerment, while others are not. Some staff noted they
thought things had gotten worse because some of the managers who
were good at empowering staff chose to successfully seek some of the
nonsupervisory RTM jobs.
The issue of "morale" is very difficult to assess. However, the comments received
do indicate there is an opportunity to strengthen morale. The open staff session
included many who wanted an opportunity to express their frustrations. In addition,
it was noted that a union is being established. Of course, it is impossible to
determine how much of this situation is due to the reorganization and how much is
due to EPA budget crisis and threat of RIFs earlier this year.
The reorganization apparently did not drastically impact expertise/institutional
memory/contacts/relationships. The States did not indicate any particular concern,
although some Regional managers felt the organization was vulnerable due to too
many people in new jobs.
Appendix 2d: Region-Specific Observations: Region V, Chicago, IL
134

-------
Management Review: Innovative Regional Structures
December 13, 1996
ACCOUNTABILITY AND INTEGRITY
This area focuses on whether the Regional reorganization has positioned Region V to
establish appropriate organizational structures, policies, and procedures to provide
reasonable assurance that the goals/objectives of Agency senior leaders are carried out
effectively, efficiently, and in compliance with applicable laws, regulations, and central
agency guidance.
• Resource and Management Integrity:
The most notable observation in this area is that the Resource Management Committee
(RMC) is showing promise. The RMC, primarily comprised of associate division directors,
is being used to discuss and come to consensus on various operational issues (resources,
personnel, space, etc.). These issues were previously addressed by the SLT, so the SLT is
now in a better position to focus as a body on more strategic, bigger picture issues.
One major change involving resource management activities is that the Region transferred
its planning functions from the resources management organization to its Office of Strategic
Environmental Analysis. Its budget office remains involved in the planning process, but no
longer leads those efforts. The splitting of the planning and resource management functions
is notable because NAPA's report, Setting Priorities. Getting Results, includes a
recommendation that EPA merge the two Headquarters offices with leads for these functions,
the Office of Policy Planning and Evaluation (OPPE) and the Office of Administration and
Resources Management (OARM). EPA is responding to this recommendation by
transferring OARM's Office of the Comptroller, OPPE's planning and evaluation functions,
and a few other administrative functions from OARM to a new Office of the Chief Financial
Officer (OCFO). Given these organizational changes taking place in Headquarters, some
Headquarters officials are concerned that in splitting its planning and budgeting functions,
Region V will be heading in a direction different from the rest of EPA. The are also
concerned that splitting these functions may diminish the authority of the Region's Senior
Resource Official.
OTHER RELATED ISSUES: A comment made by management and staff was that Headquarters
set the stage for how the reorganization would proceed. Since Headquarters did not change much
(in their opinion), it was considered too rash for the Region to consider a wholesale, fundamental
new organizational structure. Additionally, it was noted that not much guidance was available at key
times—the guidance that did come from Headquarters was too late.
Another overall comment received concerned Agency initiatives. While the Agency is trying to
reduce its layers of management, it is not reducing a major generator of more management, namely
Appendix 2d: Region-Specific Observations: Region V, Chicago, IL
135

-------
Management Review: Innovative Regional Structures		December 13, 1996
Agency initiatives and priorities. According to this comment, to maintain some consistency, the
reduction in management resources should have been accompanied by some reduction of initiatives.
Appendix 2d: Region-Specific Observations: Region V, Chicago, IL
136

-------
Management Review: Innovative Regional Structures
December 13, 1996
APPENDIX 2e
Region I, EPA New England, Boston, MA
REGION-SPECIFIC OBSERVATIONS
Site Visit: September 24-26,1996
Organizational Structure Prior to October 1, 1995
Current Organizational Structure
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
137

-------
Management Review: Innovative Regional Structures
December 13, 1996
BRIEF DESCRIPTION OF REORGANIZATION, and STATED
INTENTIONS AND DRIVERS
Region I reorganized from a traditional media-based structure to a multi media-based structure with
an emphasis on place and sector-based environmental protection. As part of its reorganization, the
Region also consolidated a number of like and complimentary activities into the new Offices it
formed. This included the consolidation of most of Region's enforcement resources into one office,
the one exception being its Superfund technical enforcement staff. Finally, as part of its
reorganization the Region took the opportunity to reassign a number of its supervisors/managersand
staff into new subject matter areas. This was done to promote cross-media expertise and provide
employees with an opportunity to change jobs.
As a result of the reorganization, the Region went from five divisions and three offices to six
organizational units it calls "Offices." Provided below, is a brief description of the new
organizational units.
•	Office of the Regional Administrator - includes the Regional Administrator, the Senior
Policy Advisors, the Offices of Regional Counsel, and Civil Rights and Urban Affairs. In
addition, this Office also includes the functions of Intergovernmental Relations, Public
Affairs, and Customer Relations and Marketing.
•	Office of Ecosystem Protection (OEP) - is designed to promote and implement integrated
place and community-based approaches to protect the environment. The Office incorporates
staff and functions from the air, pesticides and toxics, water, and RCRA programs. Its
mission is to establish environmental standards and goals and build State and community
capacity for meeting them.
•	Office of Environmental Stewardship (OES) - has two major functions, which are to carry
out most enforcement and compliance activities in the Region and provide assistance to the
regulated community to facilitate pollution prevention. Attorneys, scientific, engineering
and technical staff engaged in these activities, for all media, are located in OES.
•	Office of Site Remediation and Restoration (OSRR) - is responsible for restoring currently
contaminated properties as required under CERCLA, the RCRA corrective action program,
and the Underground Storage Tank Program.
•	Office of Environmental Measurement and Evaluation (OEME) - contains the Region's
laboratory, and its field and quality assurance functions, providing the infrastructure
necessary to measure the Region's success in the environment.
•	Office of Administration and Resources Management - provides advice and services
needed to maintain the operations of the Region and ensure the effective stewardship of the
public's funds. Responsibilities include providing finance, budget, human resources,
facilities management, and information resources management support to the Region's
program offices.
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
138

-------
Management Review: Innovative Regional Structures
December 13, 1996
In developing its reorganizationplan, Region I had several major goals. The most important of these
were to:
•	Create a placed-based and sector-based institution with an emphasis on approaching
environmental issues from a multi media perspective;
•	Better connect the Agency to the "real world";
•	Improve the Region's ability to better target its limited resources; and
•	Flatten the organization, and make it more efficient and effective, by having more
people doing program work and less management oversight.
These goals, rather than the need to reach the 11:1 employee to supervisory ratio were what drove
the reorganization.
STRATEGIC PRIORITIES
This area focuses on how well the Regional reorganization has positioned Region1 to
carry out the broad, highest-priority areas/themes/goals/guiding principles, outlined in
the Agency's FY95-99 Strategic Plan, for the current andfuture work of the Agency.
Region I's reorganization was designed to address the Agency's strategic priorities. As mentioned
above, they were the primary reasons why the Regional Office decided to reorganize. How the
Region has attempted to meet some of the more significant strategic priorities is discussed below.
COMMUNITY-BASED ENVIRONMENTAL PROTECTION (CBEP): The Region's
geographical and community-based environmental protection efforts are led by the Office of
Ecosystems Protection (OEP). This Office has a placed-based focus with a multi media orientation.
One of the main ideas behind its creation was to enhance the Region's ability to carry out
geographically and community place based environmental protection.
The Region has a number of significant ecosystem initiatives. One of these is the Resource
Protection Project, whose goal is to identify and protect important ecosystems throughout the New
England region. Working with States, local governments, other Federal agencies, associations, and
others the Region expects to be in a position to protect some of the most important, but threatened,
ecosystems in New England. As a pilot, OEP worked with the State of New Hampshire and other
outside organizations to identify those significant ecosystems requiring protection in the State, and
then worked with the State and these groups to develop plans to protect these ecosystems. The
Appendix 2e: Region-Specific Observatbns: Region I, Boston, MA
139

-------
Management Review: Innovative Regional Structures
December 13, 1996
Regional Office has started this process with the States of Connecticut and Rhode Island, and plans
to do the same for the other three New England states.
With its Urban Ecosystems Initiative, the Region is dedicating resources (dollars and FTEs) to
leverage development of sustainable public/private partnerships which is intended to build
community-based capacity to identify, assess and address urban environmental hazards and reduce
environmental degradation. This work is now underway in Boston, Providence and Hartford.
The Region is also pursuing a broad range of larger and smaller scope projects. National Estuary
Program type projects include Long Island Sound, Narragansett Bay, Massachusetts Bays (includes
Cape Cod Bay), Casco Bay and Lake Champlain. The Regional Administrator has also asked each
State to identify at least two or three places where the Region will be directly engaged in
community-based protection efforts.
POLLUTION PREVENTION: When Region I reorganized it placed its pollution prevention
activities within its Assistance & Pollution Prevention Unit, in the Office of Environmental
Stewardship (OES). This unit has two major purposes:
•	Support and promote technical and regulatory assistance programs for a wide range of
customers and to oversee development of an integrated assistance plan for the Region; and,
•	Serve as a regional resource center for developing innovative approaches to achieving
environmental goals through education and communication, for promoting pollution
prevention and environmental technologies, and for forming collaborative partnerships with
the regulated community, states, and other key partners.
The unit is organized around five separate but interrelated teams. These teams and a brief
description of their responsibilities are provided below.
•	New England Environmental AssistanceTeam (NEEAT): responsible for developingand
carrying out comprehensive sector-based assistance plans through such vehicles as the
Environmental Leadership Program and Project XL.
•	Environmental Leadership Team: Responsible for developing cooperative partnerships
with specific model companies to encourage them to promote innovative and comprehensive
environmental management systems.
•	Business and Innovative Technologies Team: Responsible for the Center for
Environmental Industry and Technology (CEIT) which is designed to foster the development
of environmental technologies, and industry outreach programs such as Green Lights.
•	Emergency Planning and Community Right to Know Team: Responsible for the Toxic
Release Inventory (TRI) program including outreach on compliance and training on data use
and interpretation.
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
140

-------
Management Review: Innovative Regional Structures
December 13, 1996
•	Solid and Hazardous Waste Work Group: Responsible for promoting pollution
prevention and waste reduction activities including recycling by offering assistance to states,
local governments, industry, and others.
During our discussions with industry representatives and external stakeholders they were very
complimentary about the Region's pollution prevention activities. They thought they were a move
in the right direction.
PARTNERSHIPS (STATES, TRIBES, IMPACT ON PPAs/PPGs): One of the key goals of the
Region I Reinvention Plan was to improve its relationships with its partners and stakeholders. These
changes involved both structural and cultural changes. The primary structural changes were as
follows:
•	Creation of State Units and State Liaisons in OEP; and
•	Increasing compliance assistance and pollution prevention staff and resources.
In addition, through its actions senior management has made it clear that it values strong
relationships with its partners and external stakeholders. This was made clear by comments we
received from these parties and also from Regional Office staff during our discussions with them.
•	States: We spoke with representatives from all the Region I states except Maine.
One facet of the reorganization that did seem to impress the representatives is the
commitment made by the Region to improving their service through new State Units
and Liaisons, which are designed to make business with the EPA as easy and
responsive as possible. The representatives largely indicated that they have not yet
seen much of an effect on their relationships with Region I because of the
reorganization. Considering some of the disruption the reorganizations have caused
in other regions, the seeming absence of disruption is interesting and perhaps may
be an early sign of some success. Although the representatives did have a couple of
complaints about occasional heavy-handedness and lack of consultation, these
appeared to be a fairly normal aspect of regional-state relationships, and not peculiar
to any aspect of the reorganization.
•	Tribes: As a result of the reorganization, the Tribes believe the Region is more
responsive and the Tribes have a better understanding of whom their Regional Office
contacts are. However, they felt that the Tribal Representatives should report directly
to the RA's Office.
•	External Stakeholders: The external stakeholders (industry, trade, and
environmental group representatives) had mixed reactions to the Region's
reorganization. Many thought that the Region's reorganization was a move in the
right direction. However, their reasons for believing this varied greatly, as the list
below demonstrates:
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
141

-------
Management Review: Innovative Regional Structures
December 13, 1996
—	Getting better environmental protection through more prevention.
—	Pollution Prevention support has made a difference.
	 More open to new ideas, initiatives.
—	Clear stewardship message coming from on high - although there
often is a disconnect at lower levels - resistance to change.
	 Making bold, results oriented decisions - making the change.
—	Proven commitment to CBEP and prepared to engage and devote
resources to urban issues. Seeing a transfer of responsibility to
empowered groups.
—	Compliance efforts are right on the money (Eg/Common Sense
Initiative, NEEAT, Environmental Leadership Program)
Despite thnr general support for the Region's efforts to reinvent the way they approach
environmental protection, some of the external stakeholders expressed concerns over various aspects
of the Region's operations. These concerns were as follows:
•	Clear stewardship message coming from on high - although there often is a
disconnect at lower levels - resistance to change.
•	Have not seen the efficiencies/streamlining yet.
•	Wary of less compliance monitoring and assuming all is well.
•	Skeptical that moving away from enforcement is right.
•	Need to deepen cooperation between assistance, enforcement and counsel so they
worl hand in hand and consistently (still, movement is in right direction).
Zillions of EPA incentive programs; relatively incoherent en mass.
ENFORCE MENT, COMPLIANCE, AND COUNSELING: As a result of the reorganization,
the vast majority of the Region's enforcement resources were placed within the OES, including
many of the Region's attorneys. Previously, the Region's technical enforcement staff and functions
had been disbursed among several organizational units, and the attomeyshad been part of the Office
of Regional Counsel (ORC). Counseling services remained with the ORC.
•	Enforcement & Compliance: OES is responsible for the Region's enforcement and
compliance assistance activities. It consists of two main programmatic units; the
Enforcement Unit and the Assistance and Pollution Prevention (P2) Unit. The
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
142

-------
Management Review: Innovative Regional Structures
December 13, 1996
Enforcement Unit is responsible for enforcing all the regulatory program
requirements under EPA's jurisdiction, while the A&P2 unit provides technical and
regulatory assistance to industry and the public sector. One reason for separating the
enforcement and compliance assistance units was to reassure the regulated
community that information obtained from compliance assistance activities would
not be used against them for enforcement purposes.
As part of its plan to reinvent itself, the Region has made a conscious effort to adjust
the balance between enforcement and compliance assistance/pollution prevention
activities. According to Region I management, the Region has the largest
compliance assistance staff in the country. While the regulated community seems
to support the Region's shift in emphasis, some Region I employees and
environmental groups expressed reservations about the Region's movement away
from enforcement toward compliance assistance. In conversations with Region I
employees we were told that the Region has put too much of its resources into
compliance assistance at the expense of enforcement.
The Region is also having some problems gaining the trust of the regulated
community. Region I staff stated that industry is fearful of getting involved with
compliance assistance activities because they still fear the hand of enforcement.
They attributed this to two factors. First, in the case of metal finishers, the Region's
pollution prevention, compliance assistance, and enforcement functions are all
targeting the same sector. Second, industry is getting a mixed message from various
segments of EPA. For example, enforcement staff tends to emphasize enforcement,
while compliance staff tends to emphasize compliance type activities. Consequently,
the regulated community is confused regarding EPA's stance on enforcement versus
compliance assistance.
•	Counseling: Counseling activities, both media specific and general legal issues such
as grants, contracts, etc. continue to be performed by the Office of Regional Counsel
(ORC). ORC staff stated that their clients liked having a central point with dedicated
resources to address general law issues.
Prior to the reorganization, a number of ORC staff had expressed a desire to work on
a greater variety of legal issues than they were being given an opportunity to work
on. Consequently, when the Region reorganized it made a conscious effort to allow
lawyers to work on a variety of legal issues (workload diversity).
As a result of the reorganization, two basic, but very important issues have surfaced
pertaining to the rendering of legal services in the Region. These two issues are the
splitting of enforcement and counseling staff, and the management of workload
diversity.
•	Splitting of Counseling and Enforcement Staff: Some ORC staff expressed
dissatisfaction with the splitting of enforcement and counseling staff. Several of
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
143

-------
Management Review: Innovative Regional Structures
December 13, 1996
them expressed the view that there is a lot of crossover between enforcement and
counseling issues. For example, one of the staff noted that the Superfund legal
support group within OES was having difficulties distinguishing enforcement from
counseling issues. Several staff also offered the view that they did not see those
counseling issues within enforcement issues were being better identified as a result
of the reorganization. On the other hand, some attorneys noted that perhaps the
organizational separation makes it easier to distinguish between legal enforcement
and counseling issues, except, perhaps, with respect to Superfund matters. This is
one reason why some ORC staff do not want counseling issues placed with
enforcement.
Also the manner in which the changes were implemented has caused management,
communication, and coordination problems. For example, a lawyer doing
enforcement work in Superfund and another area could have two supervisors rather
than one. This is because Superfund legal support is a separate organizational unit
with its own supervisor, within the legal support section of OES. Having two
supervisors has led to reporting relationship and work management problems. In
addition, because of the split between counseling and enforcement there is a greater
need to coordinate their efforts but it is not always clear who should talk to who.
Still, ORC staff did note that one advantage of having a separate counseling office
is that important counseling matters do not get pushed out by enforcement matters.
• Workload Diversity: Implementing workload diversity has not gone smoothly.
There appear to be three major issues requiring resolution.
—	First, we were told that some lawyers had an emotional reaction to the
workload diversity issue and view it negatively because they thought
they may be pressured to work in multiple areas even though they did
not want to.
—	Second, because staff are sometimes working in new and unfamiliar
areas, they lack the depth of expertise that a specialist would possess.
Consequently, they might not always provide the best advice and
make take longer to respond to inquiries. One device which ORC
uses to address this concern is the appointment of senior attorneys as
media lead liaisons with the enforcement staff. For example, one
works with both OES and Superfund staff on Superfund issues, others
work with OEP and, to a lesser extent, with OES, on water and air
issues. Last, the workload diversity issue has created a management
challenge because supervisors are not fully aware of what their staffs
are working on.
—	Third, because of workload diversity, staff are concurrently working
on multiple assignments in different areas. This makes it difficult for
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
144

-------
Management Review: Innovative Regional Structures
December 13, 1996
supervisors to evaluate employees' performance and to manage the
workload. One method that has been used to address this issue is to
have staff submit weekly reports describing what they are working on
and the status.
Region I management is aware of these issues, and is looking into ways of correcting
or ameliorating them, as part of its mid-course evaluation that is scheduled to be
completed in January 1997.
• Environmental Justice: The Review Team did not obtain enough data to form
observations or opinions on this issue.
REINVENTION PRIORITIES
This area focuses on how well the Regional reorganization has positioned Region I to
comply with EPA s reinvention guidance and achieve the Agency's reinvention goals
Shared Vision and Vdlites; Customer Focus; Diversity; Working Collaboratively; and
Streamlined and Strengthened Organizational Designs.
PROCESSES FOR REORGANIZING: For the most part, the Regional Administrator(RA) came
up with the basic reorganizationdesign. A Steering Committee consisting of management and non-
supervisory employees from various parts of the Region was formed to deal with issues related to
the reorganization, and also oversee the work of several subcommittees.
Based on comments received from various groups of Region I employees consisting of both
management and staff, it is clear that the reasons for reorganizing, the shared vision and values, and
the decision-making processes were never clearly communicated to employees. However, in
hindsight it is clear that the RA was the final arbiter of these decisions.
Many managers and staff expressed disenchantment with the way decisions were made. In large part,
this appears to stem from the fact that they were led to believe that their thoughts and ideas would
be considered in developing the reorganization plan. For example, the Region provided a number
of opportunities for employees to comment on the Region's reorganization proposal. Many
employees provided their comments and suggestions for improvement. However, the final plan
changed little from what was originally proposed. As a result, many people expressed frustration
over the entire reorganization process. They stated that the RA should have been candid up-front
about what decisions were on the table and those that were not.
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
145

-------
Management Review: Innovative Regional Structures
December 13, 1996
At the time of our visit, the staffs displeasure with the way the reorganization process was
conducted was still very high and was adversely affecting employee morale. People in a number of
different sessions felt the reorganization had lowered morale. It is important to note that many
employees were not upset so much about the final outcome of the reorganization^ they were about
the way it was accomplished. In the Team's view, it appears that the reorganization focused too
much on organizational issues (e.g., drawing boxes and lines) and not enough on people issues such
as communication, seeking and getting buy-in from employees, listening to others' views and
acknowledging the value of those views, and providing more transition support for dealing with
change. In any subsequent change efforts, the Region should more carefully balance organizational
and people issues.
Region I management acknowledged that the process could have been better managed. They
recognized that they did not effectively sell the reorganization internally, although a great deal of
time was spent trying to explain the reorganization to external parties and EPA headquarters. In
hindsight, if they had it to do over again, they stated they would mount a greater selling effort
internally. Also, they concluded that the process was overly inclusive and that the decision-making
process had not been clearly communicated to employees.
During the Team's exit briefing with senior management, we raised this subject since the Region is
in the process of conducting a mid-course evaluation. The Team recommended that the RA issue
a memorandum or hold meetings describing the purpose and scope of the mid-course evaluation, as
well as, a clear explanation of the decision-making process including what is negotiable and what
is not. The RA agreed to do this.
REINVENTION GOALS: As part of its reinvention endeavors, the Region was required to address
the following Agency Reinvention Priorities:
•	Shared Vision and Values
•	Customer Focus
•	Cultural Diversity
•	Working Collaboratively, and
•	A number of organizational design issues.
Shared Vision and Values: The Region lacks a common vision and set of values because its senior
management did not effectively communicate these to their employees. As a result, many regional
employees, including those in management, do not necessarily know what the Region's vision and
values are.
Customer Focus: The Region took a number of steps to improve their customer focus. Some of
the key actions it took are summarized below:
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
146

-------
Management Review: Innovative Regional Structures
December 13, 1996
•	Creation of State Units and State Liaisons in OEP. This provides States with "one
stop shopping" for their needs.
•	Placing an emphasis on place and sector-based environmental protection.
•	Working closer with the regulated community through programs such as compliance
assistance P2, CSI ,and XL.
•	Creating a Tribal Operations Unit within OEP.
Cultural Diversity: We are unable to judge whether the reorganization had an impact on the
Region's cultural diversity profile for both supervisors and non-supervisory personnel. This is
because when we asked both management and staff how the reorganization had affected the
Regions' s cultural diversity profile they both responded using traditional EEO measures of diversity,
rather than the more broad characteristics included under cultural diversity. In fairness to the
Region, all the other Regions we visited responded to our question regarding cultural diversity the
same way. This suggests that greater efforts are needed to educate employees about what is meant
by cultural diversity.
Using EEO measures as a proxy for cultural diversity, it appears that the reorganization had little to
no effect on the Region's diversity profile. One of the reasons for this is that the Region made a
conscious effort to ensure that the reorganization did not have a negative effect on diversity. One
of the ways it did this was to try to keep the proportion of minority and women supervisors at least
the same after the reorganization as before the reorganization. According to the Region's top
management, they thought that diversity had remained the same or improved slightly as a result of
the reorganization. However, during one of our staff discussions, some minority individuals
expressed concerns over the Region's diversity profile.
Working Collaboratively: As part of the reorganization, the Region took several actions intended
to enhance its ability for management and staff to work more collaboratively.
•	First, the Region made a conscious effort to make more use of teams, and factored
this idea into the design of its organizational structure. For example, the OES relies
heavily on a team structure for its success. Moreover, teams can also be found
throughout the rest of Region I Offices.
•	Second, the Region flattened its organizational structure and reduced the number of
supervisors. These two actions were intended to promote greater horizontal
interactions and strongly encourage supervisors to allow their staff to make more
decisions.
•	Finally, in selecting supervisors for the new organization, the Region tried to select
those individuals whom they thought possessed the characteristics of the new
management paradigm— individuals who would act more like coaches and mentors,
and who would empower their staff.
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
147

-------
Management Review: Innovative Regional Structures
December 13, 1996
Placement Process: As a result of the reorganization, approximately one-third of the managers and
10-20% of all staff were placed into new jobs outside their area of expertise. This has created a great
deal of disruption, and some discontent among staff. There were several reasons for the large
movement of people. First, the Region wanted to select, as supervisors, those individuals that best
fit the new supervisor paradigm. Second, new positions had to be found or created for displaced
supervisors. Third, the Region wanted to promote multi media expertise. One way found to
accomplish this goal was to move people from one media area to another. Last, a number of staff
expressed the desire to work in a different area and the placement process allowed the Region to
accommodate many of these individuals' requests.
The one employee group that was most hurt by the reorganization and resulting placement process
was the administrative support staff. According to senior management and staff, a number of these
employees were involved in upward mobility programs at the time of the reorganization. However
as a result of the reorganization, they all ended up doing clerical work again. This was unexpected
because management had promised them that their concerns would be addressed. Consequently, the
Region's administrative support staff is very demoralized.
In fairness to senior management they had intended to keep their promise, but the troubles
encountered in getting an enacted FY 1996 budget and the resultant furloughs and threats of
reductions in force (RJFs) prevented them from being able to do so. Senior management is well
aware of the issue, and is taking steps to see what they can do to improve the situation.
Organizational Design: In redesigning the Region's organizational structure, the Region took a
number of actions that have collectively enabled or positioned it to achieve the following objectives:
•	Reduce organizational layers;
•	Achieve 11:1 ratio;
•	Redeploy "HQ/Administrative" Staff;
•	Promote greater flexibility;
•	Improve communication and coordination; and
•	Enhance integrity, efficiency, and effectiveness.
First, the Region went from a media-based organizational structure to a multi media structure. In
moving to a multi media structure, the Region also took the opportunity to combine like and
complimentary activities into the same Office. For example, it combined the former Superfund
Division with Emergency Response activities (formerly housed in ESD) to form the Office of Site
Remediation and Restoration (OSRR). It also consolidated all of its enforcement resources
(including attorneys), except for Superfund and UST Technical Support staff, within the Office of
Environmental Stewardship.
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
148

-------
Management Review: Innovative Regional Structures
December 13, 1996
Second, prior to the reorganization, the Region had an employee to supervisory ratio of 6:1. In order
to reach the 11:1 employee to supervisory ratio, 36 of the 92 non-SES supervisors were placed into
non-supervisory jobs. These former supervisors have been reassigned to a variety of positions which
more directly support the programmatic work of the Agency, including positions of influence such
as Associate Directors and Team Leaders.
The above actions helped the Region reduce management and organizational layers; redeploy
"HQ/Administrative" employees; and achieve a supervisorto employee ratio of 11:1. These actions
were also intended to improve communications and coordination and enhance integrity, economy,
and efficiency.
Third, the Region is making greater use of teams and has a less hierarchial and detailed
organizational structure. In addition, the Region has tried to promote cross-media expertise by
moving staff to new areas. These changes should help the Region to be more flexible.
At the time of the Team's visit, the Region was in the process of evaluating the reorganization. This
process is expected to be completed in early January 1997. There were several areas where
adjustments in the organizational structure and personnel were being considered. These areas
included the OEP, OES, and the ORC. Also, the Region is aware that it is having problems
implementing the team concept, especially in OES.
NEW WAYS OF OPERATING: The Review Team was unable to reliably evaluate whether
Region I's reinvention activities have resulted in improved ways of operating. Changing the way
the Region accomplishes its work requires cultural or attitudinal shifts on the part of both
management and staff. Typically, such changes can take up to five years or more to work their way
through an organization. However, the Region's reorganization is barely a year old. Moreover, it
was anything but a normal year due to the difficulties the Agency had in obtaining an enacted FY
1996 budget. Nevertheless, we do have a number of observations to offer, which we believe are
valuable, based on comments we received from Region I management and staff.
The Team heard from both management and staff that the move to a 11:1 supervisor to employee
ratio was not working well for a variety of reasons. First, the move to 11:1 has created span of
control problems in terms of number of staff and programs under a single supervisor. In order to
achieve an overall employee to supervisor ratio of 11:1, some supervisors ended up with more than
11 employees to supervise. According to staff, some supervisors are supervising 20 or more
employees. Also, some supervisors have too many programs/different areas under them which is
taxing their abilities to adequately comprehend what they think they need to know to competently
perform their supervisory responsibilities. Second, the Agency's performance management system
requirements have not changed despite the increase span of control. Third, according to staff some
supervisors have not made the change to the new mode of managing. They are still largely behaving
as before. Fourth, as part of the reorganization a significant number of managers and staff were
assigned to areas outside their existing expertise. Also, as a result of the reorganization, new
relationships had to be developed due to the combination of organizational and staffing changes.
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
149

-------
Management Review: Innovative Regional Structures
December 13, 1996
We were told by staff in OSRR that in other parts of the organization, managers are quitting or
struggling because of the unfair burden of managing 22 people. They also said that those former
managers operating as Team Leaders are not operating differently, which the staff finds
demoralizing. Moreover, no money was saved because the Region now has more 14s and 15s than
before the reorganization. In some instances, taking away the first level of management has led to
some places where no one is really in charge. It has also put people in hopeless situations due to not
having enough time to keep up with everything. They are going from problem to problem.
Senior management acknowledged that the increased span of control is a problem for the Region.
They noted that two people have gone from supervisoiy to staff positions, and in one of those
instances span of control was a major contributing factor. Many managers are not accessible. The
problem goes beyond merely stretching the new supervisors; a basic behavioral change is required.
However, little work has been done on changing the definition of roles and most managers do not
accept the need to change. Also, the process of identifying experts has not been completed. The
managers who have changed their behavior have done so by delegating more, and by not insisting
on deciding or even hearing about every issue.
In terms of empowerment, most of the staff we talked to did not feel that they had been empowered
as a result of the reorganization. However, some did feel empowered. Whether staff felt empowered
or not, seemed to largely center around their supervisor's management style. If a supervisor was
one, who liked to empower his or her staff, then the staff felt empowered and vice versa. We were
also told that in some instances because supervisors were new to an area, and therefore lacked the
necessary technical expertise, they did not have much choice but to empower their staff.
The reorganization does not appear to have improved the economy and efficiency of the Regional
Office so far. In fact, based on management and staff perceptions, productivity, at least in the short-
term, has been hurt by the reorganization. There appear to be three principal reasons for this. First,
the reorganization process diverted staff away from their regular duties. Second, the actual
reorganization itself created disruption and required new working relationships to be formed both
within the Regional Office and with EPA stakeholders. Third, the new organizational design relies
more heavily on a matrix management structure. This structure requires more internal
communication and coordination between organizational units because their responsibilitiesare more
interrelated and overlap somewhat. This structure was chosen because of the need to maintain some
programmatic and media-specific focus, yet at the same time move forward with the Agency's
strategic priorities. As the Region gains experience with its new organizational structure and new
relationships are formed, many of these issues should conceivably lessen.
The Region is also experiencing difficulties implementing the team concept. The problem is
particularly acute in OES, which is organized around teams, and therefore, highly dependent on them
for their success. Part of the problem stems from the fact that the roles and responsibilities of teams
and their members have not been well-defined. Also, little training for how to work in teams has
been provided. Regional management is aware of the situation and is taking steps which they hope
will resolve the problems.
Appendix 2e: Region-Specific Observations: Region /, Boston, MA
150

-------
Management Review: Innovative Regional Structures
December 13, 1996
It should be noted that all five regions the review team visited were encountering problems
implementing teams. Part of the problem is that the Agency, as a whole, has not worked out all the
issues related to teams such as clearly defining roles and responsibilities, work assignment, and
performance management issues. The Agency currently has a project in process to try to address
implementation issues related to teams. The resolution of these issues should help improve the
Agency's success with teams.
In our conversations with Regional employees and with external stakeholders, we detected
indications that the Region is moving toward more results-oriented environmental protection and
away from a process orientation. We heard from external stakeholders that the Region was more
open to new ideas than it was before. For example, they mentioned the Region relieving strict clean
up standards for some Superfund sites. We also heard from Regional staff that there is a greater
focus on results than before. In our discussion with OEP staff they noted the ORC had been
approving some agreements which do not strictly comply with regulations, but do not result in any
harm to the environment. Previously, such agreements would not have been approved. Although,
we did not do enough work to reach any conclusive decisions on this issue, the signs look promising.
The Region appears to be well on its way toward developing environmental indicators and measures
for assessing how well its efforts are working. The Ecosystems Assessment Division within OEME
is responsible for developing environmental measures and indicators. Last year, the Division with
the help of a consultant worked to develop a set of measures that both EPA and the States could live
with. So far they have come up with eight or nine measures, which they plan to incorporate into the
PPGs. Some of these measures tie into EPA's National Environmental Goals. Examples of some
of the measures developed include miles of beaches open; days beaches were open; return of
indigenous species; and number of hospital admissions for asthma.
One of the problems the Region has encountered in developing measures acceptable to the States,
is that some States lack statutory authority over the areas where some of the measures have been
proposed. Consequently, even though they think the measure is good, the States find it unacceptable
because they have no control over the area.
Finally, both senior management and staff expressed concern over the potential for a loss of deep
media-specific and program specific technical expertise due to the move toward promoting cross-
program and multi media expertise. At this time, it does not appear that the Region has lost such
expertise. The fact that senior management and staff recognize this as a potential issue may prevent
it from occurring. Again, it is too soon to tell.
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
151

-------
Management Review: Innovative Regional Structures
December 13, 1996
ACCOUNTABILITY AND INTEGRITY
This area focuses on whether the Regional reorganization has positioned Region I to
establish appropriate organizational structures, policies, and procedures to provide
reasonable assurance that the goals/objectives of Agency senior leaders are carried out
effectively, efficiently, and in compliance with applicable laws, regulations, and central
agency guidance.
ACCOUNTABILITY AND INTEGRITY: Overall, it is too soon to tell whether accountability
and integrity have improved, lessened, or remained the same as a result of the reorganization. At
the time of our visit the reorganization had only been in place for about a year. Moreover, the
difficulties encountered in getting an enacted fiscal year 1996 budget severely disrupted the entire
Agency's operations during late 1995 through mid-1996, including Region I's.
In addition, the Region has not had enough operating history under its new structure for management
integrity reviews and outside audits to detect actual or potential program and management integrity
weaknesses. Nevertheless, as discussed below, some of the changes resulting from the
reorganization have the potential to improve accountability and integrity, while others have the
potential to lessen it.
RESOURCES AND MANAGEMENT INTEGRITY: Region I's decision to go to a multi media
structure has put it out of synch with the Agency's budget, program and management structures
which are still largely program and single-media based. As a result, questions have arisen regarding
the Region's ability to charge its activities back to the appropriate program budget elements. To
Region's I credit, during the reorganization it recognized this as an issue and took steps to develop
a crosswalk from the former organizational structure to the current organizational structure. The
Region believes that it is able to reliably charge its activities back to the appropriate program budget
elements, although in some cases the linkage is not always as clear as they would like.
It should be noted that the Agency, as a whole, has always had some difficulties tracking its
activities back to the Agency's individual program budget elements. This is especially true in recent
years as the Agency has moved more and more toward a multi media orientation. However, Region
I's reorganization seems to have exacerbated the problem. Finally, this issue may take on greater
significance in the future because all Federal Agencies subject to the Chief Financial Officers Act
(CFO Act) starting in fiscal year 1998 will be required to prepare financial statements that include
their budgetary accounts. In turn, the OIG or an independent public accountant (IPA) will be
required to audit the Agency's budgetary accounts and opine on their fairness. Should the OIG have
serious reservations about the way we account for our budgetary resources they may raise issues in
their audit report that will require the Agency to respond to Congress and OMB.
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
152

-------
Management Review: Innovative Regional Structures
December 13, 1996
One other issue which deserves mention pertains to the Region's ability to focus its efforts and
resources on those issues where it can add the most value. During our conversations with Region
I employees and external stakeholders (States and Industry) we were told that the Region has too
many initiatives. They thought the Region would be better off if it focused its efforts on three or
four areas, rather than trying to do something everywhere. This inability to disinvest from some
activities in order to concentrate on more value-added activities is not unique to Region I. All five
regions that we visited mentioned this as a problem. As one individual characterized it, "EPA is a
mile wide and an inch deep." Perhaps one of the factors contributing to this situation is that EPA
needs to continue its base programs because of statutory requirements while also desiring to pursue
other activities that it believes help it better fulfill its mission to protect the environment. Whatever
the case, EPA needs to better target its efforts and resources toward those areas where it can add the
most value, and to disinvest from those activities that are not high value added.
One major change involving resource management activities is that the Region transferred its
planning functions from the resources management organization to its Office of Ecosystem
Protection. Its budget office remains involved in the planning process, but no longer leads those
efforts. The splitting of the planning and resource management functions is notable because
NAPA's report, Setting Priorities. Getting Results, includes a recommendation that EPA merge the
two Headquarters offices with leads for these functions, the Office of Policy Planning and Evaluation
(OPPE) and the Office of Administrationand Resources Management (0 ARM). EPA is responding
to this recommendation by transferring 0 ARM's Office of the Comptroller, OPPE's planning and
evaluation functions, and a few other administrative functions from OARM to a new Office of the
Chief Financial Officer (OCFO). Given these organizational changes taking place in Headquarters,
some Headquarters officials are concerned that in splitting its planning and budgeting functions,
Region I will be heading in a direction different from the rest of EPA. The are also concerned that
splitting these functions may diminish the authority of the Region's Senior Resource Official.
PROGRAM ACCOUNTABILITY: For some programs, the reorganization may result in
improved program accountability. However, it is too soon to reach a conclusion. In many cases,
except for some small programs, the reorganization has resulted in the consolidation of like and
complimentary functions into a single office. For example, the OSRR combines Superfund and
emergency response activities. Previously, emergency response activities were included within the
Region's Environmental Services Division. Similarly, with the exception of Superfund and UST
technical staff, the Region's enforcement resources were consolidated into the OES. Previously, the
Region's enforcement activities were spread out between various program offices and the Office of
Regional Counsel. By consolidating these functions it should be easier to have clearer lines of
communications between HQ and the Region, and to identify responsible parties. It should also help
ensure that enforcement actions are consistent across programs.
For its multi media program office (OEP), Region I created four associate directors — one for air,
water quality, waste, and groundwater and water policy— and designated them as the sole single
senior managers (SSSMs) for their respective areas. The SSSM for pesticides is the Unit Chief,
Pesticides, Toxics, and Radiation. The creation of these positions should provide a focal point of
contact for Headquarters National Program Managers (NPMs).
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
153

-------
Management Review: Innovative Regional Structures
December 13, 1996
The one area of concern is small programs. Both HQ and Regional staff noted that the
reorganization broke up small programs such as pesticides. Although it is too soon to tell whether
these small programs have been adversely effected, the issue deserves close management attention.
If needed, consideration should be given to consolidating the Region's small programs into a single
office so that they have sufficient visibility and critical mass.
OTHER ISSUES: Four other issues deserve mentioning. They are transition assistance,
infrastructure planning and costs, and PPAs/PPGs/TEAs.
•	Transition Assistance: Transition assistance concerns the types and amount of
assistance, such as counseling and training, provided to employees before, during,
and after the reorganization. Although the Region did provide some transition
assistance to employees prior to the reorganization, most employees did not feel the
transition assistance was enough. Senior management is aware of this issue and is
taking steps to provide additional transition assistance to employees.
•	Infrastructure Support: Infrastructure is related to the basic support services
employees need to do their jobs such as physical office space, computers, telephone
service, and the like. The Region encountered some problems in this area, as did the
other four regional offices we visited. Due to the reorganization, a lot of people had
to physically move from where they were to their new locations. They also needed
to have their computers moved and their telephone service changed. This process
involves a lot of detailed logistical work and can be very expensive to do. Moreover,
the Region did not develop an implementation plan. As a result, the Region
encountered some unexpected problems in getting people situated in their new
positions. Part of this may have stemmed from the fact that the Region had planned
to phase-in its reorganization, but due to the budget situation had to rush everything
at the end.
•	PPAs/PPGs/TEAs: Most of the States appear to support the concepts behind
Performance Partnership Agreements (PPAs) and Performance Partnership Grants
(PPGs), but expressed a variety of concerns regarding their implementation. Some
of the States' more significant concerns were as follows:
—	PPGs are not broad enough and lack sufficient flexibility. For
example, Superfund programs are excluded from grants.
—	Developing systems to measure results will be tough and will take
time. Currently, almost all measurements are output related.
The Tribes we spoke to also generally supported the concepts behind Tribal
Environmental Agreements (TE As) and PPGs, but had several problems with them.
These included:
—	Lack of flexibility because they are too media specific;
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
154

-------
Management Review: Innovative Regional Structures
December 13, 1996
—	Lack of a holistic approach. The current process is too fragmented
and requires submitting paperwork over and over again.
—	Hard to get TEAs on paper and get started.
It is important to note that these issues are outside the Region's control, and
therefore, not reflective of its management of PPA, PPG, and TEA issues.
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
155

-------
Management Review: Innovative Regional Structures
December 13, 1996
Appendix 2e: Region-Specific Observations: Region I, Boston, MA
156

-------
Management Review: Innovative Regional Structures
December 13, 1996
APPENDIX 3
CONCERNS AND OBSERVATIONS OF
HEADQUARTERS OFFICES
The following appendix summarize the results of the Review Team's interviews with managers and
staff in the following Headquarters Offices:
•	Office of Air and Radiation;
•	Office of Administration and Resources Management;
•	Office of the Chief Financial Officer;
•	Office of Enforcement and Compliance Assurance;
•	Office of the General Counsel;
•	Office Policy, Planning, and Evaluation;
•	Office of Prevention, Pesticides, and Toxic Substances;
•	Office Regional Operations and State/Local Relations;
•	Office of Solid Waste and Emergency Response; and
•	Office of Water.
STRATEGIC PRIORITIES
This area focuses on how well the Regional reorganizations have positioned the Offices
to carry out the broad, highest-priority areas/themes/goals/guiding principles, outlined
in the Agency's FY95-99 Strategic Plan, for the current and future work of the Agency.
COMMUNITY-BASED ENVIRONMENTALPROTECTION: The Team gathered perspectives
about the handling of CBEP in Regional reorganizations primarily from two Headquarters offices,
OPPE and OW. The Team drew three broad conclusions from these discussions:
•	The Regions came up with a number of different structures to address CBEP;
•	There are several factors which can help CBEP staff to be successful; and
•	While there may have been extended down time during the reorganization process,
the Regions are now all doing CBEP.
Appendix 3: Concerns and Observations of Headquarters Offices
157

-------
Management Review: Innovative Regional Structures
December 13, 1996
Some Headquarters input was provided on CBEP during the reorganization, especially by OPPE
but the Regions did not respond to the suggestions, apparently. The Regions, nevertheless, seemed
to give considerable thought to the best ways to organize CBEP. A couple Regions ended up with
a management-level steering committee and a staff-level core group addressing CBEP. Another
Region uses a team approach, in addition to the core group. Other Regions have assigned
responsibility to a particular division.
The Headquarters view is that CBEP is a tool, not a program. Therefore, while it is too soon to tell,
any structure could be successful if there is adequate support from senior management. Success is
likely to also depend on clearly defining CBEP objectives and the responsibilities of CBEP staff,
where ever they are located, and providing them adequate resources and clout. OW stressed the
importance of an agreement between the Regions and their States about which are the most
important places to protect. OPPE suggested that, if the decision were to place CBEP in a media
office, it not be the Water office for fear that the effort would be limited to Water issues. OPPE also
suggested that the contributions of the Superfiind program in the community relations arena need
to be recognized by other parts of the Regions.
There were two other interesting observations.
•	OPPE thinks that place-based offices tend to improve familiarity with local
conditions and often promotes good communications with other Federal agencies,
States, and local governments.
•	The "20% for CBEP" principle has been misunderstood. Rather than requiring a
strict accounting, the Deputy Administrator apparently intended to send a signal to
the Regions that they needed to devote more of their staff to non-media specific
activities.
POLLUTION PREVENTION: Headquarters OPPTS interviewees noted that consolidation of
P2 efforts seems to work better than fragmentation of P2 by media. OPPTS specifically recognized
Region VIII's P2 program as working well. OPPTS noted, however, that pollution prevention is
a tool, but people do not know exactly what it is or how to use it. They further noted that, with the
exception of occasional small "boutique" programs, the States are not really doing pollution
prevention. The Review Team did not receive other significant comments from Headquarters
officials regarding to the impact of the Regional reorganizations on P2 efforts.
PARTNERSHIPS: Overall, Headquarters offices noted little concern about the effect of the
Regional reorganizations on the relationship of the programs or their goals with the States and
Tribes. Comments from Headquarters managers and staff related to the reorganizations' effect on
State partnerships were as diverse as the programs they manage. A number of managers from
different program offices advised the Review Team that they had heard directly from State Officials
about the confusion in the States resulting from the Regional reorganizations. They cited the
tendency of some States to jump over their Regions directly to Headquarters with their calls. The
Environmental Commissioners from the Northeastern States were given as an example of a group
Appendix 3: Concerns and Observations of Headquarters Offices
158

-------
Management Review: Innovative Regional Structures
December 13, 1996
with a strong tendency to call Washington. The State officials also complained that they do not
know who is doing what in the Regions anymore.
ENFORCEMENT, COMPLIANCE, COUNSELING, AND ENVIRONMENTAL JUSTICE:
Regions were given options for reorganizing their enforcement and compliance assurance function.
There has been a roughly even split among the Regions with some choosing an enforcement
division model and others opting for an Enforcement Coordination Office. It is interesting to note
that at least initially, one Headquarters office advocated for the creation of consolidated enforcement
offices. However, they also had a concern about whether the program staff remaining in the
Regional program office had "critical mass" after the removal of enforcement personnel. Another
Headquarters office manager made a similar complaint - that it is difficult to maintain technical
competence in small technical programs when the enforcement staffs and program staffs are
separated.
According to OECA, early results indicate that the enforcement division option may be more
effective in promoting enforcement and compliance assurance, although the results have been a
mixed bag. Also, coordination between OECA and the Regions seems more difficult with those
Regions which selected the Enforcement Coordination Office option; ECOs seem to have less clout.
On the other hand, coordination was initially more difficult with the reorganized Region VIII
because it was difficult to identify Regional contacts. Coordination is also complicated by the
existence of two different structures in the Regions.
However, again according to OECA, it is certainly too soon to tell. From OECA's experience, even
two years may not be sufficient time for all aspects of the reorganization to take hold and for it to
be fair to make judgements about the success or failure of elements of the reorganizations. It does
seem, however, that multimedia enforcement is profiting from all the reorganizations.
It is difficult to tie reorganizations to enforcement output. Overall, FY95 has been much weaker
than FY94, an enforcement banner year. Compared to the year before, only 50% of the judicial cases
were filed in FY95 and the administrative cases were down 25%. While it is too soon to tell, there
are some indications that those Regions with enforcement divisions may have an edge in case
production.
There is a belief that enforcement resources are being tapped for other purposes. As with some other
programs, enforcement resources are frequently tapped for new initiatives; this continuing practice
has significant impact over time. For example, Region X should have 98 FTE coming from OECA;
however, only 70 can be accounted for, according to a Regional pilot study.
OECA thinks that the Regions are collecting adequate information. They are getting compliance
assistance statistics and compliance rate information by industrial sectors, in addition to enforcement
figures. However, it has been more difficult gathering needed information in Regions with ECOs.
Without the DRA's active support, the ECOs may not have enough influence within the Regional
Office to consistently get needed information. It is probably also too early to determine whether the
negotiation of the MO A is easier with one organizational plan than another, once again, the ECOs
seem to have a tougher time effectively coordinating with the program offices.
Appendix 3: Concerns and Observations of Headquarters Offices
159

-------
Management Review: Innovative Regional Structures
December 13, 1996
A representativeof another Headquarters office said it was too soon to tell about the success of the
different enforcement organizations, although the drop in enforcement numbers is not promising.
He also complained the OECA did not coordinate well with other Headquarters offices m planning
the Regional reorganization effort.
Counseling- In our early discussion with representativesof the Office of General Counsel, the Team
learned that they were interested in the outcomeof our study because they did not yet have a strong
sense of the results of the reorganizations as they affected counseling activities. ("Counseling" is
used here to mean the activities of lawyers in the Regions who provide advice to program clients
about the media programs and various general law areas such as grants, contracts, appropriations,
information law, employmentlaw, cross-cutting statutes,ptoperty,and claims. Tlie advice includes
interpretations of statutes and regulations; the assessment of legal risks; and counseling about
defensive litigationand related administrativeadjudication. Such work is directly analogous to the
much of the work performed by OGC).
The participantsdid note that the resolutionof management issues concerning the Agency''s lawyers
is made more difficult by some Regional lawyers' working in two or three different offices. Also,
it is advantageous to OGC when its attorneys can call a single Regional legal expert who is able to
speak authoritatively about both counseling and enforcement matters. However, they thought that
the Team might find that legal counseling advice may be more objective, generally speaking, when
enforcement and counseling functions are separated.
It has been difficult for OGC to assess the impact of various reorganizations on Regional XL, CS1,
CBEP or other important strategic initiatives. However, it does appear that the Regions where
counse'ling and enforcement legal functions have been separated there is less flexibility than before
in •n.n./no legal issues. In particular, in Regions I, VI, and VIII, the pool of lawyers available to
do counseling work is more limited, and generally inadequate. There is inadequate depth of
available expertise in many counseling areas.
Another Headquarters office representative considers counseling the "soft underbelly" in all ten
Regions - it needs to be stronger. However, this was a condition which predated the reorganizations.
Instice: No one at Headquarters was interviewed specifically to gather Headquarters
perspectives about EJ in reorganized Regions.
Appendix 3: Concerns and Observations of Headquarters Offices
160

-------
Management Review: Innovative Regional Structures	December 13, 1996
REINVENTION PRIORITIES
This area focuses on how well the Regional reorganizations have positioned the Offices
to comply with EPA's reinvention guidance and achieve the Agency's reinvention goals:
Shared Vision and Values; Customer Focus; Diversity; Working Collaboratively; and
Streamlined and Strengthened Organizational Designs.
Headquarters managers and staff did not have much feedback on how the Regional reorganizations
have positioned to achieve EPA's reinvention goals, with the exception of Streamlined and
Strengthened Organizational Design. Related to Organizational Design, their comments and
concerns centered mainly around those issues embodied in three of EPA's organizational attributes:
Accountability; Communication and Coordination; and Integrity, Efficiency and Effectiveness.
ACCOUNTABILITY: Many of Headquarters managers and staff are concerned that accountability
has been weakened as a result of the Regional reorganizations. Even nearly a year after the
reorganizations have been in place, they still are not sure who in the Regions are responsible and
accountable for the various programs, functions, and activities. In the Regions which moved away
from the traditional single-media structure, Headquarters managers are concerned about their ability
to track resources and ensure program results.
COMMUNICATION AND COORDINATION: Many Headquarterscommenters expressed great
frustration with communication and coordination: Who do they call for information? Who does
what in the Regions? One AA commented that he has received complaints from State officials that
they do not know who is doing what in the Regional Offices anymore. While some acknowledged
that this confusion will diminish over time, they also noted that the short-term disruption to program
delivery has been enormous.
INTEGRITY, EFFICIENCY, AND EFFECTIVENESS: Transaction costs are of enormous
concerns to Headquarters. Almost every National Program Manager cited the greater difficulty in
scheduling national meetings since the Regional reorganizations. Most indicated that the number
of Regional attendees at these meetings has tripled, since programs have been broken up and require
multiple representatives now. This makes the meetings not only more expensive, but more difficult
to manage as well. One AA expressed frustration that he has not seen the same person from Region
VIII at any of the national meetings.
Headquarters managers are also gravely concerned about the integrity of small programs in the
Regions. Small programs, such as pesticides, LUST, CEPP, and Oil Spills, were broken up in some
of the Regional reorganizations. As a result, Headquarters is concerned that these programs may
have lost their critical mass for operating effectively. The Regional reorganizations may have
exacerbated long-standing problems associated with the management of small programs.
Appendix 3: Concerns and Observations of Headquarters Offices
161

-------
Management Review: Innovative Regional Structures
December 13, 1996
Historically, because of the limited resources devoted to small programs, they programs have lacked
a separate identity. By splitting up these programs, Headquarters contends that it is hard to identify
who to contact, and the programs do not get the attention they deserve. It is worth noting that some
Regional staff and State representatives who work on small programs raised this concern as well.
ACCOUNTABILITY AND INTEGRITY
This area focuses on whether the Regional reorganizations have positioned the Offices
to establish appropriate organizational structures, policies, and procedures to provide
reasonable assurance that the goals/objectives of Agency senior leaders are carried out
effectively, efficiently, and in compliance with applicable laws, regulations, and central
agency guidance.
In our discussions with Headquarters Offices, almost all of them vo.ced concerns about the effects
the Regional reorganizations might have or were having on resources management, management
integrity or program accountability. However, all the Offices noted that it was too soon to draw any
definitive conclusions at this time. This was primarily because the reorgan.zat.ons have only been
in place for about one year, and therefore, information on how well they were working was scant.
RESOURCE MANAGEMENT: The Headquarters Offices the Team spoke to raised two major
concerns. These were accounting for budgeta^ resources and the splitting of planning and
budgeting functions.
Almost all of the Headquarters Offices expressed concerns about the ability of the Regions to
properly charge their activities to the appropriate program budget elements. This was especially true
for those Regional Offices that went to a more multi-mediaorgamzational structure. Their concerns
were twofold. First, the Government Performance and Results Act (GPRA), which requires Fed^ai
Agencies to report on program performanceby developingappopnateperformancemeasures, is due
tobe implementedbeginningwith fiscal year 1999. This will reqrnre that th*, Agency have reliable
cost information for programs. Second, the Assistant Administrators (AAs) feel tha they need to
have good budget and program information when they have to go to Congress to testify regarding
their programs.
OCFO representatives told us that they thought it was too soon to evaluatehow well the Regions are
accounting for their budgetary resources. They noted that they had not yet received the results from
the financial statements audit, nor had they received the^integrity reports for fiscal year 1996.
Furthermore, they stated that the chaotic budget process that EPA went toough this year - two
shutdowns and 14 Continuing Resolutions (CRs) - only makes the situation even more murky.
Appendix 3: Concerns and Observations of Headquarters Offices
162

-------
Management Review: Innovative Regional Structures
December 13, 1996
In our discussion with Office of the Chief Financial Officer, we were told the Agency has always
had activities that fall outside of the program element structure, but that EP A seems to be engaging
in more such activities. For sometime now, Agency management has been aware of the difficulties
of trying to trace the Agency's activities, especially initiatives, back to individual program budget
elements. Thus, properly accounting for budgetary resources is not solely a Regional office issue;
it is an Agency-wide issue.
One step OCFO is taking to address the issue is to have a program element structure that can better
accommodate multi-media type activities. In addition, the Agency currently has a Truth in
Budgeting pilot going on in Regions I, III, and X. The objective of this pilot is to improve the
Agency's capabilities to properly account for budgetary resources.
A few Headquarters Offices also voiced concern that some Regions had split their planning and
budgeting functions as part of their reorganizations. This is contrary to the direction the Agency is
currently going, which is to better integrate planning and budgeting. The Tearn heard that this action
has had the effect of diminishing the affected Senior Resource Official's (SRO) authority. EPA
created the SRO position in order to consolidate all resources management responsibilities under a
single senior agency manager for each AAship/Regional Office so that these issues received the
attention the deserve. By moving the budget formulation functions outside the SRO's direct
authority, which these actions have done, the SRO's authority has been weakened.
MANAGEMENT INTEGRITY: Several Headquarters Offices raised some management integrity
issues related to the Regional offices' reorganizations. Their concerns pertained to new managers
and staff that do not understand the programs they have been assigned to, span of control problems,
and inadequate segregation of duties.
As part of their reorganizations, all the Regional Offices the Team visited had reassigned staff to
programs/areas outside their sphere of competence. For some Regional Offices and for some
programs/areas a significant amount of staff, including supervisors, were reassigned. For some
areas, both the supervisors and many of the staff were new to the area. As a result, they lack the
institutional memory and expertise to conduct the needed work in a competent fashion. These
conditions increase the likelihood that mistakes may be made.
The Team also heard that some staff were not being adequately supervised because the supervisors
had too many staff and/or too many programs/areas for them to be effectively managed. This
condition is largely attributable to the requirement to have only one supervisor for every 11
employees. In order to meet these requirement some supervisors, especially first line supervisors,
ended up with more than 11 employees. For example, during our visits we were often told that first
line managers had at least 15 to 20 people to supervise, and we heard of several instances where the
ratio was 35 or 40 to 1. In addition, the Team was also told that some supervisors had too many
programs under their control for them to have sufficient knowledge to make informed decisions. As
a consequence, staff were not always being effectively supervised.
The Team were also told that some Regional Offices in their quest to streamline and reinvent their
processes, may have gone too far. As a result, there may be situations where there is an inadequate
Appendix 3: Concerns and Observations of Headquarters Offices
163

-------
Management Review: Innovative Regional Structures
December 13, 1996
separation of duties, or to put it another, way a person may be performing incompatible functions.
One of the fundamental principles of internal control is to divide up tasks among individuals so that
no one performs a task from beginning to end. The thinking behind this concept is that by dividing
tasks up among two or more people, the probability that errors, abuses, and fraud will occur is
reduced. Furthermore, should they occur they are more likely to be detected. For example, one of
the Regions combined their procurement and facilities functions into one office.
PROGRAM ACCOUNTABILITY: From the Headquarters program offices' perspective, program
accountability primarily concerns the duties or obligations the Regional Offices have to the NPMs,
and includes such subjects as:
•	Who in the Regional Office is accountable to the NPM?
•	Who in the Regional Office should the NPM contact for information?
•	Are resources that were provided being used consistent with the Memorandum of
Agreement (MOA)?
•	Are Agency program policies being consistently applied within and between
Regional Offices?
The basic concern the Headquarters program offices expressed to us is that there is no clear Agency
accountability structure to ensure that the above issues are being adequately addressed. EPA has
never clearly defined what duties or obligations the Regions have to the NPMs. The Team was told
by several Headquarters program offices that the AAs have to go to Congress and defend the
programs. Yet, no one asked what do they need for Regional accountability?
In the opinion of the Headquarters program offices the Regional reorganizations have exacerbated
the situation because, in reorganizing, the Regions split some programs between two or more
organizational units. As a result, all of the Headquarters program offices the Tearn spoke to said that
it was not always clear who in the Regional Office was accountable to them for their programs.
Also, because the Regions spread out the resources they receive from a given NPM among several
organizational units, it makes it harder for the NPMs to know where their resources are going.
To deal with the situation, one Headquarters program office stated that they were using management
agreements with the Regional Administrators regarding what they wanted to accomplish annually.
However, using management agreements is not a panacea because all of the Assistant Administrators
are negotiating them at different times of the year and they ave different time horizons. As a result,
the Regions cannot balance them. If the management agreements were subjected to technical
analysis, the work would add up to more than we have people in the Regions to do. They are never
realistic. Moreover, management agreements should not tie up more than 90% of the Regions
resources to allow 10% flexibility.
In addition to the issues mentioned above, all the Headquarters program offices mentioned that the
Regional reorganizations had caused an increase in transaction costs. This is because programs were
Appendix 3: Concerns and Observations of Headquarters Offices
164

-------
Management Review: Innovative Regional Structures
December 13, 1996
split between more than one organizational unit in the Regions. As a consequence, instead of talking
to one person, the Headquarters Offices have to talk to two or more persons. The Team heard from
at least two program offices that for their national meetings they have to invite 3 people from each
Regional office, or a total of 30 people. Before the reorganizations they only had to invite 10 people
or one from each Regional office. This makes it harder to coordinate national meetings and
increases their costs.
PROCESSES FOR REORGANIZING
DESCRIPTION: This section focuses on the processes the Regional Offices used to
design, implement, and evaluate their new organizational structures, and the processes
the Regional Offices used to move managers and staff into new positions and/or new
organizations resulting from the reorganization.
Headquarters managers and staff had extensive comments on the Region's processes for
reorganizing. Most of their comments were highly critical of the Region's processes for
reorganizing. Most AAs generally felt that the Regions had been kept them adequately informed
about what they were doing. Below the AA level, however, Headquarters managers and staff felt
that more communication from the Region would have been helpful. One Headquarters manager
best summed up this point: "Communication was not adequate at the 'tire meets the road level' in
terms of how the Regions were going to work under these structures
They felt that when the Regional Offices were reorganizing, Headquarters Offices were not
considered "customers," and were not involved during the early design stages. Although the
Agency's reinvention guidance advised reorganizing offices to "consult early on with other affected
Headquarters and Regional Offices...," a number of Headquarters managers and staff felt that
Headquarters was viewed as an afterthought. In fact, several opined, by the time they saw the
reorganization proposals, the designs were "a done deal" and any concerns raised by Headquarters
— legitimate or not — were seen as obstacles to get around.
Further, Headquarters program officials expressed unhappiness that some Regional Offices did not
complete all the agreed-upon front-end analytical work that was expected for the proposals. The
front-end work would have demonstrated, for example, how the Regional Offices would integrate
their new multi-media activities with the traditional national programs.
Many in Headquarters felt that because of the rush to reorganize by the Deputy Administrator's
September 30,1995, deadline, some reorganization proposals were not well thought out. This has
led to a rough transition during implementation of the reorganizations.
Appendix 3: Concerns and Observations of Headquarters Offices
165

-------
Management Review: Innovative Regional Structures
December 13, 1996
Some staff, and a few managers, in Headquarters noted that morale has been affected in the Regions
since the reorganizations, and that it seems to be quite poor. Two Headquarters managers advised
that they were requested to visit Regions I and VIII to "be a cheerleader" and boost the morale of
staff.
Headquarters commenters felt that the Region's decisions to move managers and staff to new
programs and positions was not necessarily a bad idea, but the changes should have been phased in.
They believe phasing the changes in would help the new people who lack program-specific
knowledge and experience, ensure continued program delivery, and ease the transition difficulties.
In fact, they could not stress enough that for any office which plans to make radical changes in
personnel to pay more attention to transition than the Regions did in FY 1995.
AGENCY REVIEW/COMMENT PROCESS: Headquarters managers and staff also had
concerns about the Agency's review and comment process on reorganization proposals. They
expressed unhappiness with some of the Regional Offices for not completing all the agreed-upon
front-end analytical work that was expected for the proposals. In addition, they noted conflicting
tensions about their review of reorganization proposals during FY 1995. Since many Regions did
not conduct adequate advance work, many Headquarters officials were seeing the basic components
of the proposed reorganization for the first time during the expedited 10-day review period. These
officials felt they had to review the reorganizations as quickly as possible to meet the 10-day time
frame, and still conduct thorough analyses to identify important issues and potential problems in
proposals they were seeing for the first time. Most agree that this review process is flawed (both the
process and the time frames) and should be revised, based on their experiences during FY 1995.
Several senior managers in Headquarters also expressed reservation about the quality of the central
organizational analysis from O ARM. In particular, they felt that OARM analysis focused too much
on "small issues" such as organizational and position titling, and missed bigger issues such as a
reorganization's affect on the Agency's regulatory process. OARM managers acknowledged the
limited analysis. They offered a variety of possible explanations about why this happened so that
the Agency could learn for the future: The volume of work to be done was too much for the OARM
staff charged with reviewing the plans. Moreover, the group responsible for reviewing the plans
experienced much staff turnover, and the new staff lacked sufficient knowledge of the Agency's
organizational structure, delegations of authority, program expertise, regulatory processes, and
relationships with the States to adequately review the proposals. Further, OARM usually trusts the
offices across EPA which are responsible for Agency processes — such as OPPE for regulatory
processes and OC for resource allocation — to look at and comment on issues related to their
processes.
Appendix 3: Concerns and Observations of Headquarters Offices
166

-------
Management Review: Innovative Regional Structures
December 13, 1996
APPENDIX 4
GLOSSARY OF TERMS
COMMUNITY-BASED ENVIRONMENTAL PROTECTION (CBEP)
CBEP is an approach that EPA is taking to improve the effectiveness of its nation-wide regulations
and other environmental programs. With CBEP, the Agency's goals are to assess and manage the
quality of air, water, land and living resources in a place as a whole, to better reflect Regional and
local conditions, and to work more effectively with our many partners in environmental protection
— public and private. The CBEP approach tailors environmental programs to address the problems
of a particular watershed, ecosystem, or other place. CBEP is designed to maximize the use of
scarce resources, encourage local support, and consider the economic well-being of communities.
The three components of CBEP are:
1)	GEOGRAPHIC FOCUS: allows for a more comprehensive approach to
environmental protection.
2)	FOCUS ON ENVIRONMENTAL RESULTS: to measure environmental
improvement in the area of concern.
3)	PARTNERSHIPS AND STAKEHOLDER INVOLVEMENT: from all levels of
government, public interest groups, industry, academic institutions, private
landowners, concerned citizens, and others.
CBEP is the latest iteration of Ecosystems Protection, which is one of the guiding principles in
EPA's FY 1995-99 Strategic Plan.
COUNSELING
For purposes of the Innovative Regional Structures Review, "counseling" is used to mean the
activities of the lawyers in the Regional Offices who provide advice to program clients about the
media programs and various general law areas such as grants, contracts, appropriations, information
law, employment law, cross-cutting statutes, property, and claims. The advice includes
interpretations of statutes and regulations; the assessment of legal risks; and counseling about
defensive litigation and related administrative adjudication.
ENVIRONMENTAL JUSTICE (Formerly Environmental Equity)
Environmental Justice is the principle that individuals and communities will be treated equitably
under environmental laws, policies, and regulations, and that the benefits of environmental
Appendix 4: Glossary of Terms
167

-------
Management Review: Innovative Regional Structures
December 13, 1996
protection are shared by everyone. In its FY95-99 Strategic Plan, EPA includes Environmental
Justice as one of its "guiding principles" because of concern that the remedies the Agency adopted
to upgrade environmental quality during the past two decades did not always benefit all communities
or all populations within a community. Many minority, low-income, or Native American
communities raised concerns that they suffer a disproportionate burden of health consequences due
to the siting of industrial plants and waste dumps, and from exposures to pesticides or other toxic
chemicals at home and on the job, and that environmental programs do not adequately address these
disproportionate exposures.
REINVENTION GOALS:
EPA's reinvention guidance. Reinventing EPA — Steps Toward a Stronger Workforce iayS out five
"reinvention goals" for the Agency to achieve in order to affect organizational, management, and
cultural change. These goals are:
•	SHARED VISION AND VALUES: A shared picture of the organization's desired future
(vision), and the operating principles that are important for working within the organization
(organizational values and behaviors).
•	CUSTOMER FOCUS: Conducting business so that everything done supports the ability
of front-line workers, inside and outside EPA, to deliver improved environmental results to
stakeholders. [Customer focus applies in all reinvention activities, including determining the
organizational vision and values, working collaboratively, teamwork, organizational design
process re-engineering.]
•	DIVERSITY: Having, utilizing, and valuing diversity throughout the organization at all
levels and in all program activities.
•	WORKING COLLABORATIVELY: Managers and staff working trusting each other to
work toward a shared vision.
1.	Empowerment: Providing employees with the knowledge, skills, authority,
accountability, and capacity to achieve quality results.
2.	Teams: Working collaboratively within the organization and across
organizations, using groups of people with complementary skills who hold
themselves mutually accountable for their performance.
3.	Management Behavior: Redefining the roles and skills of managers so they
are coaches and facilitators who remove barriers to employee productivity
and creativity.
Appendix 4: Glossary of Terms
168

-------
Management Review: Innovative Regional Structures
December 13, 1996
•	ORGANIZATIONAL DESIGN: Achieving flexible, flatter structures that enable the
organization to better adapt to change and respond to new opportunities more effectively than
the ones which are compartmentalized and rigid. Required components of this goal are:
1.	Reduced Organizational Layers—Minimizing the number of management
layers between the people doing the work and the decision-makers.
2.	1:11 Supervisor-to-Emplovee Ratio—Having an average supervisor to
employee ratio of 1:11 in each AA/RAship by 9/30/96.
3.	"Headquarters'YAdministrative Staff Redeployment—Where appropriate,
redeploying current supervisors and OMB-designated administrative and
"Headquarters" personnel to positions directly impacting customer service by
1999. In this sense, "Headquarters" does not necessarily refer to functions
performed at EPA Headquarters in Washington, D.C., but rather to those
functions performed by central administrative or oversight units, or
"immediate offices."
4.	Flexibility—An organizational structure that readily accommodates the need
for changes in the mission, number, and composition of teams.
5.	Attributes—EPA senior leadership is giving special emphasis to the
following characteristics, which apply to the way the Agency conducts its
business and structures its organizations: Accountability; Communication
and Coordination; Customer Focus; Integrity, Efficiency and Effectiveness;
Measurement and Evaluation; and Reinvention and Streamlining.
STRATEGIC GOALS AND GUIDING PRINCIPLES:
EPA's FY 1995-99 Strategic Plan, The New Generation of Environmental Protection, lays out 13
draft national environmental goals developed by EPA's National Environmental Goals Project and
seven "guiding principles" developed by EPA senior management for guiding how EPA will achieve
its goals.
NATIONAL ENVIRONMENTAL GOAL AREAS: These goals, which have since been updated,
were a preliminary list of goal areas (presented in alphabetical order) which encompass a range of
environmental concerns critical to EPA and the country:
•	Clean Air
•	Clean Surface Water
•	Cleanup of Contaminated Sites
•	Climate Change
•	Ecological Protection
•	Improved Understanding of the Environment
Appendix 4: Glossary of Terms
169

-------
Management Review: Innovative Regional Structures
December 13. 1996
•	Prevention of Oil Spills and Chemical Accidents
•	Prevention of Wastes and Harmful Chemical Releases
•	Safe Drinking Water
•	Safe Food
•	Safe Indoor Environments
•	Stratospheric Ozone Layer Protection
•	Worker Safety
GUIDING PRINCIPLES: EPA senior management identified the seven principles for how the
Agency will achieve its national environmental goals. Because the goals were in draft at the time
the Strategic Plan went to press, the Plan devotes more detail to the guiding principles. The
principles are not listed in order of priority, i.e., principle 7 is as high a priority as principle I.
1.	ECOSYSTEM PROTECTION: EPA will encourage ecosystem management and
economic development that promotes the health and productivity of natural systems.
The long-term mutual interdependence of human and ecosystem health, as well as
economic prosperity, will be a major premise of EPA's commitment in this area.
2.	ENVIRONMENTAL JUSTICE: EPA will work to ensure that individuals and
communities are treated equitably under environmental laws, policies, and
regulations, and that the benefits of environmental protection are shared by everyone.
3.	POLLUTION PREVENTION: EPA will work to prevent pollution by:
incorporating prevention into the Agency's mainstream environmental programs;
strengthening partnerships with State, Tribal, and local governments; the private
sector, and other Federal agencies; providing information to the public; encouraging
technology innovation and diffusion; and, where necessary, working to change
existing environmental legislation. The Agency will anticipate and address future
environmental issues before they become problems.
4.	STRONG SCIENCE AND DATA: EPA will employ the best possible science,
invest strategically in research and development for the future, foster a productive
dialogue with the public about science and risk, and ensure that data are integrated
and information is available to support comprehensive environmental protection. To
be credible and effective, EPA policies, programs, and actions will be based on sound
data and research from physical, biological, and social sciences.
5.	PARTNERSHIPS: EPA will work in partnership with its stakeholders — Federal,
Tribal, State and local agencies, Congress, private industry, public interest groups,
and citizens — to develop the technology and capacity for carrying out
environmental programs and policies that are sensible, innovative, and flexible.
6.	REINVENTING EPA MANAGEMENT: EPA will strive to make itself known as
one of the best-managed agencies in the Federal Government. In an era of rapid
technological change and tight budgets, the public expects EPA to manage its
Appendix 4: Glossary of Terms
170

-------
Management Review: Innovative Regional Structures
December 13, 1996
resources, infrastructure, and processes with integrity and maximum effectiveness.
EPA will seek to manage for better results, streamline its programs, and use savings
to strengthen existing programs and invest resources in emerging high risk areas.
EPA will emphasize employee development, empowerment, and diversity.
7. ENVIRONMENTAL ACCOUNTABILITY: EPA will stress that everyone in
society is accountable for protecting and enhancing the environment. The
cornerstone of EPA's effort will be a strong compliance and enforcement program.
The Agency will promote responsible environmental behavior by: setting out clear
compliance requirements for the regulated community and communicating them
through comprehensive guidelines and technical assistance; aggressively responding
to noncompliance so that violators are penalized; and encouraging others in the
regulated community to meet their obligations. In addition, the Agency will provide
information, education, and environmental data that inform the public, and thereby
the regulated community, and promote the kind of responsible behavior that leads to
and beyond compliance with the nation's environmental laws.
Appendix 4: Glossary of Terms
171

-------