REMEDIATION SYSTEM EVALUATION

   SAVAGE MUNICIPAL WATER SUPPLY SUPERFUND SITE
               MILFORD, NEW HAMPSHIRE
          Report of the Remediation System Evaluation,
Site Visit Conducted at the Savage Municipal Water Supply Superfund Site
                    March 22-23, 2001
            Final Report Submitted to Region 1
                   September 17, 2001
I
5
V
                                LLJ
                                C3

-------
                                        NOTICE
Work described herein was performed by GeoTrans, Inc. (GeoTrans) and the United States Army Corps
of Engineers (USAGE) for the U.S. Environmental Protection Agency (U.S. EPA). Work conducted by
GeoTrans, including preparation of this report, was performed under Dynamac Contract No. 68-C-99-
256, Subcontract No. 91517.  Mention of trade names or commercial products does not constitute
endorsement or recommendation for use.

This document (EPA 542-R-02-008h) may be downloaded from EPA's Technology Innovation Office
website at www.epa.gov/tio or www.cluin.org/rse.

-------
                              EXECUTIVE SUMMARY
The Savage Municipal Water Supply Superfund Site, located on the western edge of Milford, New
Hampshire, consists of a source area and an extended plume that is approximately 6,000 feet long
and 2,500 feet wide. The remedy was divided into two operable units (OUs) based on the 1991
plume. OU1, also referred to as the OK Tool Source Area, is the portion of hte plume that had the
highest levels of groundwater contamination. OU2 is the remaining portion of the concentrated
plume and the dissolved plume.  OU1 is a State-lead site with 90% of the funding provided by the
Superfund program, and OU2 is a responsible-party site. This RSE pertains only to OU1.

The contamination of the  extended plume stems from the operation of four industrial facilities, but
the contamination from OU1 stems mostly from the former OK Tool  Company that discharged into
the subsurface volatile organic compounds (VOCs) including tetrachloroethylene (PCE),
trichloroethylene (TCE), 1,1,1 trichloroethane,  and various trade name oils and solvents. The source
material in OU1 consists of dissolved phase and possible free-phase VOCs.

Remediation in OU1 began in 1998 with the installation of an extraction and treatment system and
construction of a slurry wall that completely surrounds the source area.  The extraction and treatment
system consists of air sparging wells, a soil vapor extraction (SVE) system, four extraction wells
(two located inside of the wall and two located outside of the wall), and a treatment plant that began
full operation in May 1999.  Treated water is returned to the aquifer through three injection  wells and
one recharge chamber.  The plant has operated  almost continuously since then with a six month
hiatus in the SVE and air sparging systems in the Fall of 2000 due to a pilot study for surfactant use.
During the RSE site visit it was discovered that in December 2000 there was an accidental discharge
to the recharge chamber of an unknown amount of PCE that had been recovered and stored on site.
The contractor is working to characterize  this problem with the EPA and State overseeing that work.

Recommendations to improve system effectiveness include the following:

       reconfiguring the system such that recovered solvent is disposed of offsite thereby reducing
       the potential for accidental releases in the future;

       evaluating the  effectiveness of capture provided by the extraction wells located outside of
       the slurry wall and reporting the results;

       relocating the recharge points beyond the influence of the extraction wells;

•      verifying containment offered by  the slurry wall;

       analyzing monthly the operations  data.

These recommendations will likely require over $65,000 in capital costs and $6,000 in annual costs.

-------
Recommendations to reduce life-cycle costs include the following:

       discontinuing the steam regeneration of the carbon system and replacing the carbon when it
       is spent would require capital costs of $25,000 but would save approximately $20,000 per
       year;

       reducing operator labor from 40 hours per week to 16 hours per week would save
       approximately $99,000 per year; and

       replacing the existing blower for the SVE system with a smaller more efficient one would
       cost $15,000 up front but may reduce electrical costs by $30,000 per year.

These savings could more than offset the extra costs associated with recommendations to improve
the system effectiveness.

Finally, the RSE revealed the need to clarify an exit strategy for the OU1 system, and the RSE team
recommends more aggressive  source removal possibly through pumping from additional extraction
wells.

A summary of recommendations, including estimated costs and/or savings associated with those
recommendations is presented in Section 7.0 of the report.

-------
                                     PREFACE
This report was prepared as part of a project conducted by the United States Environmental
Protection Agency (USEPA) Technology Innovation Office (TIO) and Office of Emergency and
Remedial Response (OERR). The objective of this project is to conduct Remediation System
Evaluations (RSEs) of pump-and-treat systems at Superfund sites that are "Fund-lead" (i.e., financed
by USEPA). RSEs are to be conducted for up to two systems in each EPA Region with the
exception of Regions 4 and 5, which already had similar evaluations in a pilot project.

The following organizations are implementing this project.
           Organization
   Key Contact
        Contact Information
 USEPA Technology Innovation
 Office
 (USEPA TIO)
Kathy Yager
2890 Woodbridge Ave. Bldg. 18
Edison, NJ 08837
(732)321-6738
Fax: (732) 321-4484
yager.kathleen@epa.gov
 USEPA Office of Emergency and
 Remedial Response
 (OERR)
Paul Nadeau
1200 Pennsylvania Avenue, NW
Washington, DC 20460
Mail Code 5201G
phone: 703-603-8794
fax:703-603-9112
nadeau.paul@epa.gov
 GeoTrans, Inc.
 (Contractor to USEPA TIO)
Rob Greenwald
GeoTrans, Inc.
2 Paragon Way
Freehold, NJ 07728
(732) 409-0344
Fax: (732) 409-3020
rgreenwald@geotransinc.com
 Army Corp of Engineers:
 Hazardous, Toxic, and Radioactive
 Waste Center of Expertise
 (USAGE HTRW CX)
Dave Becker
12565 W. Center Road
Omaha, NE 68144-3869
(402) 697-2655
Fax: (402) 691-2673
dave.j.becker@nwd02.usace.army.mil
                                          in

-------
The project team is grateful for the help provided by the following EPA Project Liaisons.
 Region 1    Darryl Luce and Larry Brill
 Region 2    Diana Curt
 Region 3    Kathy Davies
 Region 4    Kay Wischkaemper
 Region 5    Dion Novak
Region 6    Vincent Malott
Region 7    Mary Peterson
Region 8    Armando Saenz and Richard Muza
Region 9    Herb Levine
Region 10   Bernie Zavala
They were vital in selecting the Fund-lead P&T systems to be evaluated and facilitating
communication between the project team and the Remedial Project Managers (RPM's).
                                            IV

-------
                             TABLE OF CONTENTS
EXECUTIVE SUMMARY	i

PREFACE	iii

TABLE OF CONTENTS 	 v

1.0 INTRODUCTION 	 1
       1.1     PURPOSE 	 1
       1.2     TEAM COMPOSITION 	 2
       1.3     DOCUMENTS REVIEWED 	 2
       1.4     PERSONS CONTACTED	 2
       1.5     SITELOCATION, HISTORY, AND CHARACTERISTICS	 3
              1.5.1    LOCATION	 3
              1.5.2    POTENTIAL SOURCES	 3
              1.5.3    HYDROGEOLOGIC SETTING	 3
              1.5.4    DESCRIPTION OF GROUND WATERPLUME	 4

2.0  SYSTEM DESCRIPTION	 5
       2.1     SYSTEM OVERVIEW 	 5
       2.2     EXTRACTION SYSTEM	 5
       2.3     TREATMENT SYSTEM 	 5
       2.4     REINJECTION SYSTEM 	 5
       2.5     MONITORING SYSTEM 	 6

3.0  SYSTEM OBJECTIVES, PERFORMANCE AND CLOSURE CRITERIA 	 7
       3.1     CURRENT SYSTEM OBJECTIVES AND CLOSURE CRITERIA	 7
       3.2     TREATMENT PLANT OPERATION GOALS 	 8
       3.3     ACTIONLEVELS  	 8

4.0  FINDINGS AND OBSERVATIONS FROM THE RSE SITE VISIT	 9
       4.1     FINDINGS 	 9
       4.2     SUBSURFACE PERFORMANCE AND RESPONSE	 9
              4.2.1    WATERLEVELS	 9
              4.2.2    CAPTUREZONES	 9
              4.2.3    CONTAMINANT LEVELS	 10
       4.3     COMPONENT PERFORMANCE	 10
              4.3.1    WELL PUMPS	 10
              4.3.2    AIR COMPRESSORS/BLOWERS 	 10
              4.3.3    EQUALIZATION TANKS	 11
              4.3.4    TRAY AERATORS	 11
              4.3.5    VAPOR PHASE GRANULAR ACTIVATED CARBON UNITS	 11
              4.3.6    CARBON REGENERATION SYSTEM  	 11
              4.3.7    CONTROLS	 12
       4.4     COMPONENTS OR PROCESSES THAT ACCOUNT FOR MAJORITY OF COSTS	 12
              4.4.1    UTILITIES	 12
              4.4.2    NON-UTILITY CONSUMABLES AND DISPOSAL COSTS	 13
              4.4.3    LABOR	 13
              4.4.4    CHEMICAL ANALYSIS  	 13
              4.4.5    OTHERCOSTS 	 13
       4.5     RECURRING PROBLEMS ORISSUES 	 13

                                           v

-------
       4.6     REGULATORY COMPLIANCE  	 13
       4.7     TREATMENT PROCESS EXCURSIONS AND UPSETS, ACCIDENTAL CONTAMINANT/REAGENT
              RELEASES	 14
       4.8     SAFETY RECORD	 14

5.0  EFFECTIVENESS OF THE SYSTEM TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT
        	 15
       5.1     GROUND WATER	 15
       5.2     SURFACE WATER	 15
       5.3     AIR	 15
       5.4     SOILS 	 16
       5.5     WETLANDS AND SEDIMENTS  	 16

6.0  RECOMMENDATIONS	 17
       6.1     RECOMMENDED STUDIES TO ENSURE EFFECTIVENESS	 17
              6.  .1   DISPOSE OF ALL RECOVERED SOLVENT OFFSITE 	 17
              6.  .2   DETERMINE CAPTURE ZONE OF EXTRACTION WELLS 	 17
              6.  .3   MOVE RECHARGE POINTS BEYOND INFLUENCE OF EXTRACTION WELLS	 18
              6.  .4   VERIFY EFFECTIVENESS OF SLURRY WALL 	 18
              6.  .5   INTERPRET MONTHLY AQUIFER AND TREATMENT SYSTEM DATA	 19
       6.2     RECOMMENDED CHANGES TO REDUCE COSTS	 19
              6.2.1   DISCONTINUE ONSITE STEAM REGENERATION OF CARBON SYSTEM	 19
              6.2.2   REDUCEOPERATORLABOR 	 20
              6.2.3   REPLACE THE BLOWER WITH A SMALLER, MORE EFFICIENT MODEL	 20
              6.2.4   REQUEST A SURVEY OF ELECTRICITY USAGE	 20
       6.3     MODIFICATIONS INTENDED FOR TECHNICAL IMPROVEMENT 	 21
              6.3.1   IMPROVE INVOICING AT STATE LEVEL TO ENSURE TIMELY DELIVERY OF MONTHLY
                     UPDATES	 21
              6.3.2   REPAIR OR REPLACE AIR COMPRESSOR FOR AIR SPARGING SYSTEM	 21
       6.4     MODIFICATIONS INTENDED TO GAIN SITE CLOSE-OUT	 21
              6.4.1   CLARIFY EXIT STRATEGY AND CLOSURE CRITERIA	 21
              6.4.2   AGGRESSIVE MASS REMOVAL 	 22
                     6.4.2.1 STRATEGY #1: PUMPING FROM THE "HOT-SPOT" WELLS	 22
                     6.4.2.2 STRATEGY #2: CHEMICAL OXIDATION OF "HOT-SPOT"  	 23
       6.5     UNUSED GOVERNMENT-OWNED EQUIPMENT	 24
       6.6     SUGGESTED APPROACH TO IMPLEMENTATION  	 24

7.0  SUMMARY 	 25
List of Tables

Table 7-1.      Cost summary table
List of Figures

Figure 1-1.
Figure 2-1.
Site layout showing OU1, OU2, and the 1990 contaminant plume
The slurry wall and components of the OU1 remediation and monitoring systems
                                           VI

-------
                                1.0 INTRODUCTION
1.1        PURPOSE

In the OSWER Directive No. 9200.0-33, Transmittal of Final FYOO - FY01 Superfund Reforms
Strategy, dated July 7,2000, the Office of Solid Waste and Emergency Response outlined a
commitment to optimize Fund-lead pump-and-treat systems. To fulfill this commitment, the US
Environmental Protection Agency (USEPA) Technology Innovation Office (TIO) and Office of
Emergency and Remedial Response (OERR), through a nationwide project, is assisting the ten EPA
Regions in evaluating their Fund-lead operating pump-and-treat systems.  This nationwide project is
a continuation of a demonstration project in which the Fund-lead pump-and-treat systems in
Regions 4 and 5 were screened and two sites from each of the two Regions were evaluated.  It  is
also part of a larger effort by TIO to provide USEPA Regions with various means for optimization,
including screening tools for identifying sites likely to benefit from optimization and computer
modeling optimization tools for pump and treat systems.

This nationwide project identifies all Fund-lead pump-and-treat systems in EPA Regions 1 through 3
and 6 through 10, collects  and reports baseline cost and performance data, and evaluates up to two
sites per Region. The site  evaluations are conducted by EPA-TIO contractors, GeoTrans, Inc. and
the United States Army Corps of Engineers (USAGE), using a process called a Remediation System
Evaluation (RSE), which was developed by USAGE. The RSE process is  meant to evaluate
performance and effectiveness (as required under the NCP, i.e., and "five-year" review), identify
cost savings through changes in operation and technology, assure clear and realistic remediation
goals and an exit strategy,  and verify adequate  maintenance of Government owned equipment.

The Savage Municipal Water Supply Superfund Site was chosen based on initial screening of the
pump-and-treat systems managed by USEPA Region 1 as well as discussions with the EPA Remedal
Project Manager for the site and the Superfund Reform Initiative Project Liaison for that Region.
This site has relatively high operation cost and a long projected operating  life.  This report provides
a brief background on the  site and current operations, a summary of the observations made during a
site visit, and recommendations for changes and additional studies. The cost impacts of the
recommendations are also discussed.

A report on the overall results from the RSEs conducted for this system and other Fund-lead P&T
systems throughout the nation will also be prepared and will identify lessons learned and typical
costs savings.

-------
1.2       TEAM COMPOSITION

The team conducting the RSE consisted of the following individuals:

       Frank Bales, Chemical Engineer, USAGE, Kansas City District
       Rob Greenwald, Hydrogeologist, GeoTrans, Inc. (EPA TIO's contractor)
       Peter Rich, Civil and Environmental Engineer, GeoTrans, Inc.
       Doug Sutton, Water Resources Engineer, GeoTrans, Inc.
1.3
DOCUMENTS REVIEWED
Author
US EPA
COM
US EPA
COM
USGS,
Philip T. Harte, et al.
COM
USGS
Date
9/27/1991
6/96
12/19/1996
3/23/2000 -
1/16/2001
2001
2001
2001
Title/Description
Record of Decision, Savage Municipal Water Supply
Superfund Site, Milford, NH, September 27, 1991
OK Tool Source Area Savage Superfund Site - OU1,
Municipal Water Supply Well, Milford, New
Hampshire, Conceptual Remediation Design Report
Volume 1
Explanation of Significant Differences
Progress Reports 26 - 38 (9/1999 - 9/2000) for the OK
Tool Source Area Remedial Construction and
Operations project.
Testing and Application of Water-Diffusion Samplers
to Identify Temporal Trends in Volatile-Organic
Compounds, USGS Open-File Report 00-196
Plant operation data for the Savage Superfund Site
Aquifer sampling data for the Savage Superfund Site
1.4
PERSONS CONTACTED
The following individuals were present for the site visit:

       Thomas C. Andrews, P.E., New Hampshire Department of Environmental Services
       Richard Goehlert, RPM, EPA Region 1
       Darryl Luce, Project Liaison, EPA Region 1
       Joe Newton, Plant Operator, COM, Inc.

-------
1.5        SITE LOCATION, HISTORY, AND CHARACTERISTICS

1.5.1       LOCATION

The site is located at the western edge of Milford, New Hampshire, which is approximately 30 miles
from Manchester, New Hampshire. The site includes a plume of tetrachlorethylene (PCE) and other
contaminants that stretches approximately 6,000 feet east from the intersection of Route 101 and Elm
Street. The plume is bordered to the north and east by the Souhegan river, flows generally to the
east in an alluvial aquifer, and has a plume width of approximately 2,000 at the widest point. The
site consists of two operable units.  Operable Unit 1 (OU1) is State-lead with Superfund money and
consists of pump-and-treat, soil vapor extraction, and air sparging systems as well as a slurry wall to
address a source area located at the former OK Tool Property. OU2 addresses the extended portion
of the plume and is led by the responsible parties. The site layout outlining the plume, OU1, and
OU2 is shown on Figure 1-1. The land surrounding the site is a mix of residential, commercial,
agricultural, and industrial. This RSE only pertains to OU1.

1.5.2       POTENTIAL SOURCES

Four industrial plants (Hendrix Wire and Cable Corporation, Hitchiner Manufacturing Company, OK
Tool Company, and New England Steel Fabricators, Inc.) contributed to the subsurface
contamination from the  1940s to the 1980s. Hendrix and Hitchiner remain the only two viable
responsible parties and therefore will lead the remediation of OU2. Although chromium, arsenic,
polychlorinated biphenyls (PCBs), tetrachloroethylene (PCE), and other volatile organic compounds
(VOCs) were used by these manufacturers, PCE  remains the contaminant with the highest
concentrations and most significant extent. The primary contributor to the PCE contamination
appears to have been the OK Tool Company where drains connected solvent tanks to the
subsurface. The  SVE and pump-and-treat systems of OU1 extract contaminated vapor and
groundwater underlying the property. High dissolved concentrations of PCE suggest the presence of
freephase PCE in the groundwater in OU1.

1.5.3       HYDROGEOLOGIC SETTING

The site is relatively flat at approximately 275 feet above sea level and lies in the 100-year flood plain
of the Souhegan River.  The subsurface consists  of approximately 5 feet of rich loam that overlies 60
to 120 feet of glacial outwash, which consists primarily of coarse sands and gravel.  Fractured
bedrock underlies the outwash and slopes from an approximate elevation of 210 feet in the western
portion of the site to 160 feet in eastern portion.  The weathered and fractured zones of this bedrock
are 30 to 40 feet deep in the western portion and  10 feet deep in the eastern portion.  An intermittent
layer of glacial till, which is thicker in the west and thinner in the east, lays between the outwash and
bedrock.

Groundwater elevations are typically 10 feet below land surface, and typical groundwater velocities
range from 1.5 to 2.5 feet per day. Both the  Souhegan River and water supply wells significantly
affect groundwater flow directions and velocities. The Souhegan  River is a losing river in the
western portion of the site and becomes a gaining river approximately 1500 feet east of the former
OK Tool Property.  Local water usage from this aquifer is approximately 2,900,000 gallons per day
with the majority of the pumping occurring at fish hatcheries to the north of the Souhegan River.

-------
One of the fish hatchery wells has had concentrations of PCE at 2 ppb suggesting the pumping may
be drawing contaminants under the river.

1.5.4       DESCRIPTION OF GROUND WATER PLUME

The PCE plume extends from the former OK Tool property 6,000 feet east with a maximum width of
approximately 2,000 feet (see Figure 1-1). Vertical profiling within the slurry wall at OK Tool source
area in 1997 revealed dissolved PCE concentrations exceeding 100,000 ppb suggesting the presence
of PCE  in the form of dense non-aqueous phase liquid (DNAPL). Concentrations outside of the
slurry wall were as high as 5,000 ppb before pumping began. In portions inside and outside of the
slurry wall dissolved PCE reaches from the water table into the bedrock.  In addition, DNAPL may
exist in the fractures, especially within the area encircled by the slurry wall. Potential fractures
below this encircled area may provide conduit for DNAPL migration outside of the slurry wall
regardless of hydraulic containment.

The PCE plume is shown in Figure 1-1.  While PCE is the most extensive contaminant of concern,
high concentrations of trichlorethylene (TCE) and 1,2  c/s-dichloroethylene (DCE) are also present.

-------
                          2.0  SYSTEM DESCRIPTION
2.1        SYSTEM OVERVIEW

The remedy includes a slurry wall for containment of the onsite source area, a groundwater
extraction system (2 wells inside slurry wall and 2 outside the wall), a soil vapor extraction system
(within the slurry wall), an air sparging system, and a groundwater treatment plant with an associated
air exhaust treatment system.  The treated ground water can be reinjected inside of the slurry wall
through two injection wells or outside of the slurry wall through an injection well and/or an
infiltration gallery. The components of the remediation, including the slurry wall, are shown in
Figure 2-1.
2.2        EXTRACTION SYSTEM

Two extraction systems were constructed, one for soil vapor and the other for groundwater. The
soil vapor extraction system includes an air sparging system to enhance recovery from the SVE
system and to help lower ground water concentrations in the source area. Two deep wells, IW-1 and
IW-2, extract groundwater from within the slurry wall to maintain an inward gradient from the
surrounding river and prolific aquifer.  Each of these wells is pumped at 17 gallons per minute. The
operator has noted that pumping from IW wells could be significantly increased without exhausting
the available water but that these wells are currently limited by their pumps to 25 gpm each. Two
extraction wells, EW-1 and EW-2, are outside the slurry wall on the east and are pumped at 25 gpm
each in an attempt to remediate the portion of the aquifer in OU1 outside of the slurry wall.
2.3        TREATMENT SYSTEM

The treatment system consists of two equalization tanks, two air stripping units with capacities of
150 gpm each, and a vapor phase carbon unit for treating the off gas of the air stripper and the air
recovered from the SVE system.  Two boilers are maintained daily to provide steam that can be used
to heat the influent into the carbon unit, to regenerate the carbon onsite, and to use steam in the air
sparging system.  Steam has not been used in the air sparing system to date.
2.4        REINJECTION SYSTEM

There are three injection wells and one recharge gallery. Reinjection within the slurry wall was only
done for the first few months of operation. Since then, and at the time of the RSE, reinjection was
accomplished through the recharge gallery.

-------
2.5        MONITORING SYSTEM

Groundwater is sampled at least twice per year from approximately 50 sampling points that include
piezometers and monitoring wells installed at various depths and locations.  The samples are
analyzed for VOCs by NHDES, and the cost of these analyses is not included in the project costs for
EPA. The extraction wells, plant influent, and plant effluent are sampled monthly and analyzed for
VOCs. The costs of these analyses, however, are included in the EPA project costs. The air influent
and effluent of the vapor phase carbon are sampled one to two times per month by the plant
operator, and the plant operator analyzes the samples onsite for VOCs via gas chromatography.
Water levels are measured monthly from approximately 45 locations and daily from the INEEL well
located near the center of the area enclosed by the slurry wall.

The locations of the piezometer and monitoring-we 11 clusters mentioned in this report are indicated
in Figure 1-2.

-------
      3.0  SYSTEM OBJECTIVES, PERFORMANCE AND CLOSURE
                                     CRITERIA
3.1        CURRENT SYSTEM OBJECTIVES AND CLOSURE CRITERIA

For the selected remedy, the ROD stipulates a pump-and-treat system extracting 250 gallons per
minute (gpm) to contain the migration of contaminants from the source area of the former OK Tool
property and an additional 150 gpm from the source area on the Hitchiner property. Groundwater
treatment would include metals removal and UV oxidation for contamination at the OK Tool
Property, and the treated groundwater would be discharged to the Souhegan River or reinjected into
the aquifer.

The ROD also stipulates a pump-and-treat system to address the extended plume. As the extended
plume is addressed by the responsible parties, this report does not consider it further.  This RSE only
pertains to OU1.

An Explanation of Significant Differences (BSD) signed in December 1996 notes that the remedy for
the OK Tool source area includes purchase of the property, installation of a slurry wall surrounding
a source of contamination, a total of four extraction wells with a cumulative pumping rate of 70
gpm, and installation of a soil vapor extraction system with air sparging. The BSD  stipulates that the
extracted water would be treated with air stripping and carbon adsorption and would be discharged
to the ground through a recharge gallery and injection wells. Thus, the maximum contaminant levels
(MCLs) would be the primary, but not the sole, criteria for ground water discharge.

Both the ROD and the BSD make clear that the stated cleanup levels are interim goals until more
detailed information is gained through system operation.

Additional objectives for the  OU1 pump-and-treat system result from a Consent Decree between the
EPA, New Hampshire,  and the responsible parties. This decree states that after 20 years of operation
of the OU1 pump-and-treat system, the responsible parties may sample for a period of 10 years the
portion of OU1 that lies outside of the slurry wall. If contaminant concentrations from this sampling
suggest that OU1 will continue to provide a source of contamination to OU2, the responsible parties
can abandon remediation efforts in OU2. Thus, the managers of the OU1  system have  incentive to
restore the aquifer to levels below the maximum contaminant levels (MCLs) in less than 20 years or
ensure containment of the contamination.

EPA Region 1 policy does not allow direct release of PCE into the air from the treatment plant. Thus,
the site managers maintain an objective to minimize discharge of PCE into the air through the use of
a vapor phase carbon adsorption system.

-------
3.2       TREATMENT PLANT OPERATION GOALS

The current contract for operations calls for the plant to operate 24 hours per day, seven days a week
while treating water from the four extraction wells. A plant operator attends the site four days per
week for a total of 40 hours per week.
3.3       ACTION LEVELS

The groundwater cleanup levels and the discharge limits for treatment plant effluent are the MCLs as
established by the Safe Drinking Water Act.  For PCE and TCE, the cleanup and discharge limit is 5
ug/L.

-------
   4.0  FINDINGS AND OBSERVATIONS FROM THE RSE SITE VISIT
4.1        FINDINGS

In general, the RSE team found a well-maintained site with involvement of both the EPA RPM and a
manager from the New Hampshire Department of Environmental Services. The observations and
recommendations given below are not intended to imply a deficiency in the work of the designers,
operators, or site managers but are offered as constructive suggestions in the best  interest of the EPA
and the public. These recommendations obviously have the benefit of the operational data
unavailable to the original designers.
4.2        SUBSURFACE PERFORMANCE AND RESPONSE

The groundwater extraction system operates smoothly with infrequent shutdowns. The site operator
sets the variable rate pumps in IW-1 and IW-2 to extract water at approximately 17 to 20 gpm each
and has throttled back significantly the constant rate pumps in EW-1 and EW-2 so that they pump
approximately 25 gpm each. Thus, the groundwater extraction system pumps approximately 85
gpm despite a treatment plant capacity of nearly 300 gpm.

The soil vapor extraction (SVE) system has been running less frequently than the groundwater
extraction system due a pilot study conducted inside the slurry wall to test the use of surfactants in
removing DNAPL at neutral buoyancy.  The SVE system and the associated air sparging system were
shut down during the fall of 2000 for this study. While the SVE system has been running since the
beginning of January, the air sparging system is shut down due to problems with the air compressor.

The entire system was shut down for 10 days at the end of December for the holidays.

4.2.1       WATER LEVELS

Rainfall in the area exceeds 25 inches per year and without pumping from IW-1 and IW-2
groundwater would likely mound within the area enclosed by the slurry wall thereby reducing the
wall's effectiveness.  The plant operator measures the water levels in all of the monitoring wells
(inside and outside of the wall) on a monthly basis and the levels in the INEEL well on a daily basis.
He uses those daily measurements from the INEEL alone to adjust the pumping rates of IW-1 and
IW-2 and reduce the mounding of groundwater. The  USGS monitors PW-8 and PW-9 daily, but
these measurements are not reviewed by the plant operator.

4.2.2       CAPTURE ZONES

Potentiometric surfaces have not been plotted to determine the capture zones associated with the
slurry wall and the extraction wells or to validate the containment offered by the wall. During the
RSE visit the operator mentioned water elevation within the slurry wall varies directly with the
elevation of the river.  He and the site managers assume this water is seeping in through the bedrock
or till below the wall.  Pumping tests across the wall have not been conducted.

-------
A calculation of approximate recharge to the area enclosed by the slurry wall compared to the
pumping rate within the slurry wall suggests a hydraulic connection between the area enclosed by
the wall and the rest of the subsurface. The wall encloses an area of approximately 125,000 square
feet, and the Milford area receives approximately 2.5 feet of recharge per year, for a total recharge
within the wall from precipitation of 312,500 cubic feet per year or approximately 2.3 million gallons
per year (7.481 gallons per cubic foot).  Groundwater extraction from within the wall totals
approximately 35 gallons per minute or 18 million gallons per year. Thus, groundwater extraction
from via pumping exceeds atmospheric recharge by almost an order of magnitude. Given that water
levels do not drop significantly within the wall due to pumping at this rate, water is likely entering
the enclosed area from the rest of the subsurface suggesting a hydraulic connection either through or
under the wall.

4.2.3       CONTAMINANT LEVELS

Vertical profiling in 1997 showed that PCE concentrations in the contaminant "hot spot" (located
approximately 100 feet southwest of the center of the area now enclosed by the slurry wall) ranged
from 0 to 100,000 ug/L from the water table to the bedrock. When plant operation began in early
1999 concentrations extracted by the IW-1 and IW-2 were 900 and 2000 ug/L, respectively.  In EW-1
and EW-2 they were 1400 and 750 ug/L, respectively.  Concentrations in these wells at the time of
the RSE were much lower: 650 ug/L, 950 ug/L,  400 ug/L, and 150 ug/L, for IW-1, IW-2, EW-1, and
EW-2, respectively. Concentrations in a majority of the monitoring wells  have also decreased.
However, the PCE concentrations in the PW-6 cluster have significantly increased since operation,
which is consistent with its location- midway between the hot spot and the interior extraction wells,
IW-1  and IW-2. The concentrations at the PW-10 cluster of wells (located on the interior of the
slurry wall on the downgradient side) have also  increased.  Finally, PCE concentrations at PW-14
(located on the eastern edge  of OU1) have not significantly increased or decreased since operation.

While concentrations in EW-1 and EW-2 consistently decreased between the beginning of operation
and January  2001, the RSE team expects them to rise due to an inadvertent release of PCE above
discharge limits into the recharge gallery in November 2000. Already, the effects are noticeable in
EW-1 and EW-2, which have shown significant increases in concentration since January 2001.
4.3        COMPONENT PERFORMANCE

4.3.1       WELL PUMPS

The pumps in IW-1 and IW-2 are both capable of pumping up to 25 gpm rather than the current 17
gpm, and the wells would yield significantly more than 25 gpm with stronger pumps.  The pumps in
EW-1 and EW-2 are throttled back and are capable of producing much more water than their current
total of 50 gpm. The pumps are throttled back to minimize the water from each well to the levels
necessary for capture as specified in the Explanation of Significant Differences and the design
report. No maintenance issues or problems with pumps were identified.

4.3.2       AIR COMPRESSORS/BLOWERS

The SVE system uses a 50-horsepower blower.  This is larger than necessary for extracting 300 to
500 standard cubic feet per minute  from the SVE wells at a pressure drop of 40 inches of water. The
                                            10

-------
fans on the tray aerators are of adequate power and have functioned with little or no operation
problems. The air compressor for the air sparging system, however, was not operational and was in
need of repair or replacement at the time of the RSE.

4.3.3       EQUALIZATION TANKS

There are two equalization tanks. As the system runs nearly continuously at a constant flow rate,
these equalization tanks are unnecessary. However, little or no sediment has been found in them,
and they do not require frequent cleaning.

4.3.4        TRAY AERATORS

Two tray aerators, each with four trays, are installed at the plant. These aerators were designed to
cumulatively treat 300 gpm with solvent concentrations of 29 mg/1. The  aerators discharge treated
water to the building sump, and gravity carries the water to the recharge gallery. There are no
carbon polishing filters on this plant as typical operation does not require polishing to meet the
discharge requirements. The air discharge is routed to a preheater and then on to a vapor phase
carbon unit. Currently, the plant utilizes only one of the  tray aerators due to the flow rates and
concentrations that are below the design parameters.

4.3.5       VAPOR PHASE GRANULAR ACTIVATED CARBON UNITS

Two vapor phase carbon units are used to treat the off gas from the tray aerators. The influent to
these carbon units is heated with a preheater to lower humidity and maximize carbon adsorption
efficiency.  The carbon units are regenerated approximately once per day by a steam regeneration
unit which disposes of the condensed steam and recovered solvent in an onsite storage tank.  The
discharge from the carbon units is monitored one or two times per month for breakthrough using the
onsite GC.

4.3.6       CARBON REGENERATION SYSTEM

The carbon regeneration system includes two boilers, a dual phase separator, and a solvent recovery
tank. The regeneration system is designed based on the expected recovery rate of 25 pounds of
PCE per day; therefore, the system is currently set to automatically regenerate the active carbon unit
each 24 hours of operation. The SVE and groundwater extraction system, however, cumulatively
extract only 0.5 to 1 pound of PCE per day suggesting that onsite carbon regeneration may not be
necessary or cost-effective.  The boilers require a water softening system and monthly service. In
addition, the operator blows them down twice per day.   In addition to steam regeneration and
preheating of the carbon influent, the boilers also provide heat for the building.

Problems with this system stem from disruptions in the steam cycle  arising from boiler blow downs.
This occasionally results in the steam regeneration system running continuously over an extended
weekend and filling the solvent recovery tank with water. Wiring has been altered to prevent this
from occurring again.   In an attempt to remove the water from the storage tank, the plant operator
has recycled the  contents of the solvent recovery tank into the equalization tanks and back through
the treatment system. This has led to inadvertent releases of dissolved and possibly freephase PCE
into the recharge gallery.  This is discussed further in  Sections  4.7 and 6.1.5.
                                             11

-------
4.3.7       CONTROLS

The plant is competently controlled.  The system can operate with little operator attention needed
except for process monitoring (sampling and GC analysis).  The controls are set up with 14 alarms
that result in shutdown of the extraction and treatment systems and a call through an autodialer to the
plant operator. The automation of the plant is sufficient for remote operation.
4.4        COMPONENTS OR PROCESSES THAT ACCOUNT FOR MAJORITY OF
           COSTS

Current monthly invoices range from $26,000 to $30,000 for an annual cost of over $350,000 per
year. The budget for the next operating year is $517,000 but this is expected to be reduced. Despite
plant operation for two years, the contract specifies both construction and operation and
maintenance (O&M) costs. Therefore, monthly costs include both O&M and construction related
tasks including providing as-built and record drawings.  The most significant costs associated with
the site are utilities and labor associated with plant operation.

The following chart provides a breakdown of regular monthly costs. Approximate upper limits are
shown for gas and electric costs.

 operator labor (40 hours per week)                              $15,000

 operator per diem                                              $1,500

 Proj ect Management (for O&M only)                             $2,5 00

 Boiler chemistry testing and servicing                               $150

 Analytical (treatment-system water only)                            $450

 Landscaping                                                     $350

 Computer maintenance                                            $200

 Control support                                                  $250

 Electric                                                       $4,000

 Gas                                                           $2,500

 Water                                                           $250

 Phone and cell phone                                             $100
 Approximate total monthly costs                                $27,750

4.4.1       UTILITIES

The utility costs are summarized in Section 4.4. Gas expenses appear to fluctuate significantly, ranging
from under $1,000 to over $2,500. These fluctuations correspond to seasonal changes but are also


                                            12

-------
influenced by rising gas prices. Gas usage during the summer months appears to be approximately 33%
less than gas usage during the winter months indicating that the boilers for steam generation account for
the majority of gas usage in the winter and nearly all of the gas usage in the summer.

Electrical expenses in the year 2000 ranged from just over $1,000 to over $4,000.  This range is likely
due to air conditioning in the summer months and varying use of the  SVE and air sparging systems.

4.4.2       NON-UTILITY CONSUMABLES AND DISPOSAL COSTS

The only consumables at the plant are those associated with conditioning the water for the boiler.
As demonstrated in Section 4.4, these costs are minimal. As of yet, the plant has not disposed of
PCE off site.

4.4.3       LABOR

Currently, the plant operator works four days per week for a total of 40 hours per week and stays
locally in a hotel. Project management includes approximately one site visit per month and minimal
work on monthly reports. Additionally, there are likely costs associated with construction that are
not included in Section 4.4.

4.4.4       CHEMICAL ANALYSIS

Because NHDES does the analysis for the aquifer sampling and the operator uses onsite gas
chromatography for air sampling the  only analytical costs are for plant influent and effluent.

4.4.5       OTHER COSTS

Since installation of the wall and the  pump-and-treat system, EPA has funded modeling efforts
conducted by the USGS. These modeling results have been used by the RPM to analyze remediation
strategy with respect to the Consent Decree governing the remediation in OU2.  These costs are
currently about $10,000 per year. In addition, significant funding from EPA has been made
available for assistance in the surfactant pilot study. These costs have been as high as $5,000 per
month.
4.5        RECURRING PROBLEMS OR ISSUES

The notable recurring problems are 1) occasional extended, unattended steam regeneration that fills
the storage tank with water and 2) the broken air compressor for the air sparging system.  The first
of these problems is discussed further in Sections 4.7, 6.1.5, and 6.2.1. The second problem is
discussed in Section 6.3.2.
4.6        REGULATORY COMPLIANCE

Since the operation began in early 1999, the plant has generally met the discharge criteria set by the
ROD. However from April through July 2000 and October 2000 through January 2001, the
discharge level of 5 ug/L for PCE was exceeded and is being investigated by the New Hampshire
                                           13

-------
Department of Environmental Services.
4.7       TREATMENT PROCESS EXCURSIONS AND UPSETS, ACCIDENTAL
          CONTAMINANT/REAGENT RELEASES

The RSE team determined that the high PCE concentrations that were observed in the effluent result
from recycling of solvent through the treatment system. Multiple times the steam regeneration unit
has operated unattended over the weekend and filled the remainder of the 1,000-gallon solvent-
storage tank, which had over 100 gallons of freephase PCE.  In an attempt to remove the excess
water, the plant operators recycled the contents of the solvent storage tank through the treatment
system.  Given that the air stripper is unable to treat water at such high concentrations, significant
masses of PCE (likely including freephase PCE) were discharged from the plant through the
recharge gallery.  In one instance, the contents of the tank were "trickled" into the equalization tanks
that precede the air strippers, and in another event the contents were  "dumped" into the equalization
tanks.

These high effluent concentrations were reported in tables within the monthly reports,  as is typically
done for all effluent concentrations, but no special notice or mention accompanied the results.
4.8       SAFETY RECORD

The plant appears to have had an excellent safety record.
                                          14

-------
     5.0  EFFECTIVENESS OF THE SYSTEM TO PROTECT HUMAN
                     HEALTH AND THE ENVIRONMENT
The ROD stipulates restriction of groundwater use and monitoring of soils, sediments, and surface
water in the area in an attempt to protect the public.
5.1        GROUNDWATER

The area overlying and surrounding the PCE plume is a mix of residential, commercial, agricultural,
and industrial property with heavy water usage.  Groundwater usage in the area at the time of the
ROD was approximately 2,900,000 gallons per day with the heaviest usage coming from the fish
hatcheries to the north of the Souhegan River. PCE has been detected in fish hatchery wells at
concentrations up to 2 ug/L.  The Savage Municipal Water Supply Well is currently owned by the
State and is not currently used as it does not have well-head treatment. While well-head treatment
has been suggested for this well, local authorities are  not interested in pursuing it.

Residences in the area, including the mobile home park downgradient of the source area, have been
on city water since before plant operation.  This city water is obtained from wells unaffected by the
site contamination.

Although pumping continues in OU1 both inside and outside of the slurry wall, containment of
contaminants within the slurry wall or within OU1 in general, has not been verified.
5.2        SURFACE WATER

Surface water in the area consists primarily of the Souhegan River which is a gaining river on the
downgradient side of the contamination. It is therefore impacted by the contaminated groundwater
but to an unqualified level as shown by sampling records for the site that do not indicate current
detectable contamination of the river. Other surface water in the area consists of a drainage channel
used by the Hendrix and Hitchiner facilities on the other side of Elm Street. This drainage channel is
not influenced by contamination in OU1.  A surface water body southwest of the Savage well,
termed the Savage Pond in the ROD, is recharged from the groundwater and had detectable levels of
PCE, TCE, and 1,2 DCE at the time of the Remedial Investigation.
5.3        AIR

Air discharged from the treatment system is the only potential source of contaminants in the air from
this site. However, the plant treats less than one pound of PCE per day and removes this from the
air discharge with carbon adsorption.  Thus, air from the treatment plant does not pose a threat to the
public. Even if the air discharge were not treated with carbon the release of one pound per day
through the air discharge would be insignificant compared to typically permitted discharges.
                                           15

-------
According to the site managers, there were reports of detectable PCE concentrations at the nearby
police station to the west of the site. The SVE system may be required to prevent PCE vapors from
migrating to the building.
5.4        SOILS

Contaminated surface soils are not present at the site.  In addition, a fence surrounds the site to
prevent access by the public.
5.5        WETLANDS AND SEDIMENTS

PCE and other VOCs were detected in the sediments of the Savage Pond at the time of the Remedial
Investigation. VOC contamination of sediments near the permitted outfall of the Hitchiner facility
were also detected during the Remedial Investigation.  The RSE team is unaware of any recent
samples taken from either of these two locations.
                                           16

-------
                           6.0   RECOMMENDATIONS
6.1        RECOMMENDED STUDIES TO ENSURE EFFECTIVENESS

6.1.1       DISPOSE OF ALL RECOVERED SOLVENT OFFSITE

In at least two episodes throughout 2000, the operator (or substitute operators) recycled recovered
solvent through the treatment system because the storage tank, which contained solvent, had filled
up with water from the steam regeneration unit.  Because the treatment system is not designed to
remove free product from the influent water, the contents of the solvent tank should not be recycled
through the system. Recommendation 6.2.1, which suggests removal of the steam regeneration unit
and off-site disposal of carbon, would eliminate the necessity of an onsite storage tank and therefore
remove the potential hazard of releasing its contents into the subsurface.

6.1.2       DETERMINE CAPTURE ZONE OF EXTRACTION WELLS

The capture zones of EW-1 and EW-2 should be evaluated to ensure their operation meets the
requirements of the remedy in the most efficient manner possible. Additional investigation and
evaluation of the present contaminant masses and the recovery hydraulics is necessary to attain the
maximum effect of the recovery and recharge system.

To evaluate the capture zones of EW-1 and EW-2, plume maps should be generated semi-annually as
aquifer VOC samples are collected and potentiometric surface maps should be generated monthly as
water levels are measured. Each quarter, the most recent plume map should be compared to the
potentiometric  surface maps generated during that quarter.  For capture of the plume, hydraulic
gradients should indicate flow toward the extraction wells for all areas of the plume. An initial cost
of $15,000 may be required to generate CADD site maps and previous plume  and potentiometric
surface maps.  Generating these maps with data collected in the future and interpreting them in a
quarterly report may increase annual costs by approximately $4,000 per year.  It should be noted that
if the potentiometric surface maps are not sufficiently resolved to determine the capture zone, the
USGS model of the site may be helpful in capture zone analysis.

In addition to measuring and interpreting the water levels, the PCE concentrations from the PW-12,
PW-13, PW-14, and MW-16 clusters should be tracked over time. If the capture offered by EW-1
and EW-2 is sufficient, then concentrations in these sampling points should decrease. Previous PCE
concentration trends in these sampling points indicate at least partial capture.

•      Analysis of the PCE concentration from NHDES sampling of PW-12s shows an order of
       magnitude increase in PCE concentration in November 2000. This increase could be
       correlated with releases of PCE into the recharge gallery located on the surface
       approximately 150 feet to the west. If sampling from this well  continues to show a rise, it is
       likely that the contamination is coming from the recharge gallery and  is not captured by the
       extraction wells.

       The rest of the PW-12 wells, which are located deeper in the aquifer, have shown a decrease

                                           17

-------
       in PCE concentration from July 1998 through November 2000.

•      Over the same time period, PCE concentrations in PW-13S and PW-13M have also
       decreased, but the PCE concentrations in PW-13D have remained relatively high.

       Concentrations in the PW-14 cluster have not changed significantly between July 1998 and
       November 2000.

       Concentrations in the MW-16 cluster have decreased over the same time frame.

Thus, the extraction wells appear to prevent PCE from migrating downgradient through the deeper
portions of the glacial outwash; however, they may not provide capture in the bedrock (PW-13R) or
in the shallow portions of the aquifer near the recharge gallery.  Because sampling and analysis is
conducted by the NHDES, no costs are expected from this recommendation.  However, if it becomes
evident that freephase PCE in the recharge gallery provides a contaminant source, a new extraction
well may be  required approximately  150 feet to the north of EW-1. Tracking of the contaminant
trends in the  extraction wells, analyzing the trends quarterly, and reporting the results could increase
annual costs  by $2,000 per year.

6.1.3      MOVE RECHARGE POINTS BEYOND INFLUENCE OF EXTRACTION WELLS

The current location of the recharge gallery provides a significant source of water and, in the future,
may feed clean water toward the extraction wells.  Moving the recharge from the current gallery to a
new one closer to the river will reduce the amount of clean water collected by the extraction system.
The associated piping is expected to cost approximately $20,000. Internal costs to EPA for scoping
and contracting the work will also be incurred.

6.1.4      VERIFY EFFECTIVENESS OF SLURRY WALL

Currently, the operator is using only the INEEL well to gauge the containment offered by the slurry
wall.  While  this offers a method of determining the water level at one point within the wall, it does
not accurately determine the hydraulic gradient across the wall boundary. Rather, containment
should be determined from the hydraulic gradients obtained from measuring water levels weekly in
the following piezometer pairs: PW-10M and PW-11M, PW-5M and PW-2M. Extraction rates from
IW-1  and IW-2 should be adjusted weekly such that the hydraulic gradients evaluated from these
water-level measurements ensure flow directed into the area enclosed by the wall.

Water levels measured from these piezometers on September 6, 2000 suggest containment at these
locations with the exception of the deep portion of the glacial outwash and bedrock screened by
PW-5(D and R) and PW-2(D and R). This may present an avenue for contamination to be
transported beyond the source area enclosed by the slurry wall.

Additionally, to determine the effectiveness of the slurry wall, a pumping test should be conducted
by extracting water from IW-1 and IW-2 at 25 gpm for 48 hours and measuring the time-varying
response of the water levels in the  following piezometers: PW-8M, PW-9M, PW-10(M and D), PW-
11(M and D), PW-5(S, M, D, and R), PW-2(S, M, D, and R). The wall is effective if water levels in
piezometers PW-9M, PW-11(M and D), and PW-2(S, M, D, and R) have a significantly reduced
response compared to the water levels in piezometers PW-8M, PW-10(M and D), and PW-5(S, M, D,
and R). The cost of conducting and analyzing this pumping test is approximately $30,000.

                                            18

-------
6.1.5       INTERPRET MONTHLY AQUIFER AND TREATMENT SYSTEM DATA

The monthly reports, jointly written by the plant operator and the contractor's project manager
include little or no analysis of the data. This is especially evident in four of the monthly reports
reviewed by the RSE team during the site visit.  These four reports showed that plant effluent
exceeded the MCLs for PCE established by the Safe Drinking Water Act, but these effluent
concentrations only appeared in a table. They were not highlighted or described in the text.  While
no specific discharge permit from the State of New Hampshire applies to this site, these effluent
concentrations were in violation of the ROD.

Aquifer contaminant sampling data and water level measurements should also be analyzed to ensure
the effectiveness of the slurry wall and the containment of the plume outside of the wall by EW-1
and EW-2. The monthly interpretation of operations and aquifer data should be summarized by the
contractor in a section  of the monthly report and then reviewed independently and in a timely
manner by the EPA RPM and state manager.  The cost of these monthly analyses by the contractor
should be covered by the present costs of project management.
6.2        RECOMMENDED CHANGES TO REDUCE COSTS

The large deviation between current operating conditions and the design values (i.e., pumping rates
and influent concentrations) impacts the cost effectiveness of the system operation. The following
recommendations suggest opportunities to reduce costs without reducing system effectiveness.

6.2.1       DISCONTINUE ONSITE STEAM REGENERATION OF CARBON SYSTEM

The actual VOC removal rate from the groundwater and SVE systems combined is about 0.75
pounds per day, or 50 times less than the design rate.  The continued operation of the steam
regeneration unit is costly and not required given the actual VOC loading. The most recent gas bill
reviewed by the RSE team was dated March 29, 2001  and suggested delivery charges of
$0.3741/therm for the first 400 therms and $0.3191/therm for the remaining therms. In addition, the
cost of the gas was $0.9428/therm.  Assuming the gas usage from the summer months when no
heating of the plant was required, it appears that the boilers require approximately 1,500 therms per
month for steam regeneration. Calculating the monthly cost for natural gas with these figures results
in expenditures of nearly $2,000 per month.  At a conservative granular-activated-carbon (GAC)
usage of 5 pounds of GAC  to 1 pound of VOC and $3 per pound of GAC, about $4,000 would be
required annually for GAC  replacement.  Thus, discontinuing use of the steam regeneration unit
would save approximately $20,000 per year. Additionally, the steam regeneration unit requires much
of the operator's time. Thus, removal of this system would allow for a reduction in labor costs.
Purchase and installation of the necessary liquid phase carbon units would likely cost approximately
$25,000 excluding costs for scoping and contracting the work; however, savings in natural-gas costs,
after accounting for carbon replacement,  should pay for this capital expenditure in less than a year.
The cost for removal of the equipment for the current steam regeneration system would likely cost
an additional $10,000, but this removal is not necessary to implement the recommendation.

Although the boilers are also currently used for heating the air stream entering the carbon and the


                                            19

-------
building, smaller, more efficient heating sources can be used instead. The cost of heating the air
system should be weighed against the cost of GAC efficiency. Without heating, the GAC costs could
increase to $8,000 per year.  Heating of the building could be reduced due to a reduction in time
spent by the operator at the plant.

6.2.2      REDUCE OPERATOR LABOR

Over half of the system expense is associated with the onsite full-time operator.  The operator
spends a significant portion of time 1) checking and adjusting the boilers so that steam can be
available for vapor heating and  GAC regeneration and 2) performing air analysis via gas
chromatography on 4 samples approximately every 2 weeks. As stated above, the steam
regeneration system is not necessary and its removal would significantly reduce onsite labor. The air
analysis is also not necessary and its removal would further reduce onsite labor.  To maintain the
current level of effectiveness, a PID (photo-ionization detector) could be used to determine GAC
breakthrough. The required operator time after removing these unnecessary processes, but
including the  water level measurements discussed in Section 6.1.2, is 16 hours per week or less.
This reduction in labor potentially could result in approximate savings of $7,500 per month in labor
and an additional $750 per month in operator travel expenses. These monthly savings translate to
approximate annual savings of $99,000. The system operator should be located within 1 hour
driving time from the site for cost-effectiveness and timely response to any alarm conditions.

6.2.3      REPLACE THE BLOWER WITH A SMALLER, MORE EFFICIENT MODEL

The existing 50 horsepower blower accounts for more than half of the electrical costs and is not
necessary to extract up to 500 cubic feet per minute of soil vapor at a head of about 40 inches of
water.  An EG&G Rotron model DR909 of 15 horsepower can provide the current extraction rate
with significantly less power consumption.  Replacing this blower would cost approximately
$15,000, including  installation, but would result in substantial savings in electrical costs. The rates
for electricity at the Savage site are "stepped" and have varied over the past year. The first 500 KWh
are generally charged around $0.14/KWh, the next 1,000 KWh are generally charged at $0.10/KWh,
and the remainder is charged around $0.09/KWh. There is also a demand charge of approximately
$8.50/KW. Operating a 50-horsepower blower instead of a 15-horsepower blower requires an extra
35 horsepower.  Assuming a motor efficiency of approximately 75%, this translates to approximately
35 KW. Over the course of a 30-day month, this approximately translates to an extra 25,000 KWh.
At the lowest step rate, this would translate to over $2,200 per month.  In addition, the reduction in
required power will yield a decrease in the demand charge of approximately 35KW x $8.50/KW =
$298. Thus, total savings of $2,500 per month or $30,000 per year could result from  replacing the
50- horsepower blower with a 15-horsepower blower. These cost savings will pay for the new
blower within one year.

6.2.4      REQUEST A SURVEY OF ELECTRICITY USAGE

Request that the local electric utility conduct a free, onsite survey of electricity usage with
suggestions for further reductions.
                                            20

-------
6.3        MODIFICATIONS INTENDED FOR TECHNICAL IMPROVEMENT

6.3.1       IMPROVE INVOICING AT STATE LEVEL TO ENSURE TIMELY DELIVERY OF MONTHLY
           UPDATES

Over the past year, there has been consistent delay of approximately 6 months between an
operational month and submission of the monthly report to the state manager. During the RSE, it
was suggested that the contractor was postponing submission of the monthly reports to NHDES
because of delays in NHDES processing the invoices from the contractor. Efforts should be made
on both the state and contractor ends to accelerate the transfer of monthly reports to the state
manager and the EPA RPM. This will result in a more timely analysis of the data by the RPM and
state manager allowing them to potentially identify any problems or developments.

6.3.2       REPAIR OR REPLACE AIR COMPRESSOR FOR AIR SPARGING SYSTEM

The air sparging system has not operated for approximately six months or more. A majority of this
downtime results from required shutdown during a pilot study conducted onsite in association with
EPA Headquarters.  However, the last two months of downtime results from mechanical problems
with the air compressor. The air compressor should be replaced or repaired so that the air sparging
system can operate. The costs of repair are unknown; however, a new system could likely be
purchased for approximately $15,000.
6.4        MODIFICATIONS INTENDED TO GAIN SITE CLOSE-OUT

6.4.1       CLARIFY EXIT STRATEGY AND CLOSURE CRITERIA

A clear exit strategy should be determined for the site that adheres to both the ROD and the Consent
Decree discussed in Section 3.1. Based on interviews during the RSE site visit, the state is
anticipating shutting the extraction system down or significantly reducing the extraction rate in
March 2009 when the site is transferred from EPA to the New Hampshire Department of
Environmental Services. The slurry wall installed at the site may justify reduced operation at this
time but only if it is demonstrated to effectively contain the VOC source area. Currently, the
effectiveness of the wall is not well established. As the plant operator mentioned, the water levels
inside the wall change with the stage of the river suggesting the river and aquifer outside of the wall
are hydraulically connected to the area inside of the wall. Even without the influence of the river,
recharge from rain will provide a continuing source of approximately 2 million gallons of water per
year within the wall that must be removed.  The pumping tests and water level measurements
suggested in Recommendation 6.1.4 will more clearly demonstrate the effectiveness of this slurry
wall. If the wall is effective, the exit strategy can be based on the concentrations outside of the wall.
However, if the wall is ineffective, the exit strategy should account for DNAPL within the wall that
may act as a continuing source of VOCs.

A further need for clarification of the present exit  strategy is that the ROD stipulates only interim
cleanup levels until more data is collected from the site.  Additionally, according to the RPM, the
Consent Decree stipulates that the responsible parties from OU2 can abandon cleanup duties after 30
years if at that time  OU1 can still potentially act as a continuing source of contamination that
prevents OU2 from reaching cleanup levels.


                                           21

-------
6.4.2      AGGRESSIVE MASS REMOVAL

DNAPL within the slurry wall would provide a continuing source of dissolved phase VOCs. Given
that groundwater likely travels beneath the slurry wall, other methods of source control or source
removal should be investigated. Once the treatment system operation and associated costs are at a
suitable level with a clear schedule of operation and maintenance requirements, additional mass
removal efforts from within the wall (and potentially near the recharge gallery) should be
considered.  Various strategies are suggested in the following two subsections.

6.4.2.1     STRATEGY #1: PUMPING FROM THE "HOT-SPOT" WELLS

The most logical and least costly option is to pump groundwater from one to five of the 17 wells
installed in the source area during the surfactant pilot study and to treat this water in the air stripper,
which has a capacity of 150 gpm. Putting the other air stripper into service would allow for a total
capacity of 300 gpm, allowing significant pumping through both these new wells and the existing
extraction wells.  Due to the large number of possible pumping configurations, this new extraction
system should be flexible, allowing pumping configurations to change to maximize mass removal.
This flexibility can be achieved by laying pipe underground from the equalization tanks to a location
central to all of "hot-spot" wells.  Fittings should be installed on the well-end of this piping to allow
pumps to be connected  via hoses. The light weight and flexible nature of the hoses will allow the
pumps to be moved from one well to another.  The cost of purchasing and installing single-wall
permanent piping along with the hoses and fittings is approximately $6,000. This cost estimate does
not include costs internal to EPA for scoping and contracting the work.

It is important to note that pumping from the "hot spot" may result in extraction of freephase PCE
from the subsurface. Therefore, the equalization tanks in the treatment plant should be replaced
with a single tank that will prevent freephase PCE from passing through the rest of the treatment
system. This is required because the tray aerators are not capable of removing freephase PCE and
from the process water, and discharge excursions could result if freephase PCE is extracted from the
subsurface and not separated from the process water.  A replacement tank that can be pumped from
the top (rather than drained from the bottom) or that can have baffles installed will suffice. The
approximate capital costs for installing a new tank is approximately $10,000.  Once again, this cost
estimate does not include costs internal to EPA for scoping and contracting the work.

Annual costs also are likely to increase.  For example, continuous operation of five additional 5-
horsepower pumps and the blower for the second tray aerator would increase the cost of utilities by
approximately  $3,000 per month.  Thus, at a minimum, if this pumping strategy is employed from
May through October annual costs are likely to increase by $18,000 per year.

This pumping strategy would be augmented by the air sparging system once the compressor is
repaired.  Additionally, the onsite boilers would allow the potential use of steam injection to enhance
source  removal, albeit at a higher cost due to the use of natural gas.

Preliminary estimates suggest that the recommendation to replace onsite steam regeneration of the
carbon with offsite regeneration is still valid  and cost effective despite increase pumping and
chemical loading. The  extraction system currently pump water with a blended concentration of
approximately 750 ug/L at  84 gpm to the treatment plant. This corresponds to a daily chemical
loading of approximately 0.75 pounds of PCE per day.  Pumping from the hot spot wells or
increasing the flow from EW-1 and EW-2 could double or even triple this flow rate.  In addition, an

                                            22

-------
increase in the concentration of the plant influent would be expected with pumping from the hot
spot wells. This increase would likely be significant at first but water from EW-1 and EW-2 would
continue to dilute the influent and high concentrations would decrease shortly after pumping
commenced.

Assuming pumping from the hot spot wells brings the total flow rate to 150 gpm (the capacity of one
of the air strippers) and the influent concentration increases by a factor of three, the chemical
loading to the vapor phase carbon would be approximately 4 pounds of PCE per day or
approximately 1,500 pounds of PCE  per year.  Conservatively, this would translate to 7,500 pounds
of carbon per year at an annual cost of $22,500. This is lower than the annual cost of $24,000 due to
the natural gas used for steam regeneration although the cost savings is substantially less.  However,
further benefits arise from discontinuing steam regeneration.  First, regenerating carbon offsite
eliminates the hazards associated with storing recovered PCE onsite.  Second,  eliminating the steam
regeneration system allows for a decrease in operator labor that could save as much as $99,000 per
year.

As an initial step in planning to pump from the hot spot wells, a select number of them should be
sampled for VOCs to determine the concentration.  The results from this  sampling could then be
used to project the  influent concentrations when pumping from these wells. Such projections
should include dilution by water from the other wells and decreases in concentrations within the hot
spot wells as pumping progresses. Including labor, these wells could be sampled and the  analyzed at
an independent laboratory for approximately $3,000.

6.4.2.2     STRATEGY #2: CHEMICAL OXIDATION OF "HOT-SPOT"

Another possibility for source removal is in situ chemical oxidation.  A September 1998 EPA
publication titled Field Applications of In Situ Remediation Technologies, Chemical Oxidation (EPA
542-R-98-008) documents the use of in situ chemical oxidation at other sites contaminated with PCE
and other VOCs. The following table provides three particular sites discussed in this document and
the chemical technology used to address PCE contamination.
Site
Westinghouse Savannah River Site, Aiken, SC
Canadian Forces Base Borden, Ontario, Canada
Dry Cleaning Facilities, Hutchinson, KS
Technology
Fenton's Reagent (Geo-Cleanse®)*
Potassium permanganate
Ozone (C-Sparge™)
*It should be noted that Fenton's Reagent could adversely affect the slurry wall.

The facility at the site already has many of the elements necessary for delivering the oxidizing agents.
For example, the reinjection wells RW-1 and RW-2 and extraction wells IW-1 and IW-2 are in good
locations for addressing the "hot spot" with Fenton's reagent or potassium permanganate.
According to the design proposal these wells are made of carbon steel with stainless steel well
screens.  Similarly, the  air sparging wells are in a good location for addressing the "hot spot" with
ozone. This existing infrastructure would significantly reduce the cost of treating the  source area
"hot spot" with chemical oxidation. The first step in addressing this strategy is to conduct an initial
investigation which may include developing a site profile and supplying it to vendors of the
technology.  This initial investigation should be used primarily to determine the cost effectiveness of
                                             23

-------
the approach and should cost approximately $25,000. The costs of implementing the strategy likely
would be significantly higher and would depend on the extent of treatment.  It should be noted that
because DNAPL PCE may have spread to the bedrock, effective delivery of oxidants may be
difficult, which would limit the success of this more expensive process.
6.5        UNUSED GOVERNMENT-OWNED EQUIPMENT

If the recommendation suggested in Section 6.2.1 is implemented, a vapor phase carbon system with
steam regeneration will no longer be used. This equipment could be used at future Fund-lead sites
or at current Fund-lead sites where contaminant loading has changed since the original design. If the
recommendations suggested in Sections 6.2.2 and 6.2.3 are implemented, a gas chromatograph and a
50-horsepower blower also would be unused.
6.6        SUGGESTED APPROACH TO IMPLEMENTATION

The suggested recommendations could be implemented in the following manner. With the exception
Recommendations 6.2.2, 6.4.2.1, and 6.4.2.2, all Recommendations can be implemented immediately
and concurrently. Initial efforts should focus on 6.1.1, 6.1.2, 6.1.3, 6.1.4, 6.1.5, and 6.3.1 as they
pertain to protection of human health and the environment.  Efforts should then focus on
recommendations 6.2.1, 6.2.3, and 6.2.4 which involve cost reductions. Work associated with 6.2.1,
installing new vapor phase carbon units to replace the existing steam regeneration carbon system,
may include sampling of the "hot spot" wells (part of Recommendation 6.4.2.1) as future operations
may include extracting groundwater from these wells.  Once onsite steam regeneration is eliminated
the boilers are no longer necessary as heating for the building can be provided by unit heaters.  With
the removal of the boilers, the operator labor can be reduced (6.2.2).  Finally, once the above
recommendations have been implemented and the system has reached steady-state operation, efforts
can be focused on the Recommendations 6.3.1, 6.4.1, 6.4.2.1 and 6.4.2.2, which focus on exit
strategy and aggressive mass removal.
                                           24

-------
                                   7.0  SUMMARY
In general, the RSE team found a smoothly running treatment system and well-maintained site. The
observations and recommendations mentioned are not intended to imply a deficiency in the work of
either the designers or operators but are offered as constructive suggestions in the best interest of the
EPA and the public. These recommendations have the obvious benefit of the operational data
unavailable to the original designers.

Several recommendations are made to enhance system effectiveness, reduce future operations and
maintenance costs, improve technical operation, and gain site close out.  The recommendations to
enhance effectiveness include an improved sampling program to determine the extent of a new
source area and to determine the containment offered by the extraction wells and the slurry wall.
Recommendations to reduce costs include discontinuing steam regeneration of carbon and replacing
used carbon, replacing the existing blower for the soil vapor extraction system with a smaller unit,
and reducing  operator labor.  Finally, recommendations promoting site closure include developing a
clear exit strategy that ensures human and ecological protection and considering more aggressive
source removal. Table  7-1 itemizes all of the recommendations as well as the cost (or cost savings)
and reason for each one.
                              Table 7-1. Cost Summary Table
Recommendation
6.1.1 Dispose of recovered
solvent offsite
6.1.2 Evaluate capture zones
through data analysis
6.1.3 Move recharge points
beyond influence of extraction
wells
6.1.4 Verify effectiveness of
slurry wall
6.1.5 Interpret treatment
system data
6.2.1 Discontinue steam
regeneration of carbon system
6.2.2 Reduce operator labor
Reason
Effectiveness
& Simplicity
Effectiveness
Effectiveness
Effectiveness
Effectiveness
Cost
Reduction
Cost
Reduction
Estimated Change in
Capital
Costs
$0
$15,000
$20,000
$30,000
$0
$25,000
$0
Annual
Costs
$0
$6,000
$0
$0
$0
($20,000)
($99,000)
Lifecycle
Costs *
$0
$195,000
$20,000
$30,000
$0
($575,000)
($2,970,000)
Lifecycle
Costs**
$0
$112,000
$20,000
$30,000
$0
($297,000)
($1,600,000)
                                            25

-------
Recommendation
6.2.3 Replace the blower with
a smaller, more efficient
model
6.2.4 Request survey of
electricity usage
6.3.1 Improve invoicing at
State level to ensure timely
delivery of monthly updates
6.3.2 Repair or replace air
compressor for air sparging
system
6.4. 1 Clarify exit strategy and
closure criteria
6.4.2. 1 Pumping from "hot-
spot" wells
6. 4.2.2 Conduct initial
investigation for aggressive
mass removal
Reason
Cost
Reduction
Cost
Reduction
Technical
Improvement
Technical
Improvement
Gain Site
Close Out
Gain Site
Close Out
Gain Site
Close Out
Estimated Change in
Capital
Costs
$15,000
$0
$0
$15,000
$0
$16,000
$25,000
Annual
Costs
($30,000)
$0
$0
$0
$0
$18,000
$0
Lifecycle
Costs *
($885,000)
$0
$0
$15,000
$0
$556,000
$25,000
Lifecycle
Costs**
($469,000)
$0
$0
$15,000
$0
$306,000
$25,000
Costs in parentheses imply cost reductions.
* assumes 30 years of operation with a discount rate of 0% (i.e., no discount)
** assumes 30 years of operation with a discount rate of 5% and no discounting in the first year
                                                 26

-------
FIGURES

-------
                        FIGURE 1-1. SITE LAYOUT SHOWING OU1, OU2, AND THE 1990 PCE PLUME (concentrations are in ug/L)
-N-
                                                    (Figure compiled from Figures 1-1 and 1-2 in the OK Tool Source Area. Savage Superfund Site - OU1,
                                                    Municipal Water Supply Well. Milford, New Hampshire, Conceptual Design Report. VOL 1, CDM, Inc.
                                                    June 1996).

-------
                  FIGURE 1-2. THE SLURRY WALL AND COMPONENTS OF THE OU1 REMEDIATION AND MONITORING SYSTEMS
           -N
                                                                                                               EW-1
                       LEGEND
©
        SLURRY  WALL
        EXTRACTION WELL
        REINJECTION  WELL
A  AIR  SPARGING  WELL

D  SVE WELL

m  PIEZOMETER  OR MONITORING-WELL CLUSTER
"*  REFERENCED IN THE  RSE REPORT
                                                                                                                          PW-13
                                                                                                                             -16
(Figure compiled from data and figures in the OK Tool Source Area. Savage Superfund Site - OU1,
Municipal Water Supply Well, Milford, New Hampshire, Conceptual Design Report, V01. 1, CDM, Inc.,
June 1996).
                                                                                                                   50
                                                                                                          SCALE IN EEET
                                                                                                                            300'

-------
                                                             Solid Waste and
                                                             Emergency Response