EPA542-R-07-017
                                       September 2007
              Pr*C1*"                   www.epa.gov/tio
                                www.clu-in.org/optimization
REMEDIATION SYSTEM EVALUATION (RSE)
     ACE SERVICES SUPERFUND SITE
             COLBY, KANSAS
  Report of the Remediation System Evaluation

      Site Visit Conducted April 24, 2007
               Final Report

              September 2007

-------
                                        NOTICE
Work described herein was performed by GeoTrans, Inc. (GeoTrans) for the U.S. Environmental
Protection Agency (U.S. E.P.A). Work conducted by GeoTrans, including preparation of this report, was
performed under EPA contract 68-C-02-092 to Dynamac Corporation, Ada, Oklahoma. Mention of trade
names or commercial products does not constitute endorsement or recommendation for use.

-------
                               EXECUTIVE SUMMARY
A Remediation System Evaluation (RSE) involves a team of expert hydrogeologists and engineers,
independent of the site, conducting a third-party evaluation of site operations. It is a broad evaluation that
considers the goals of the remedy, site conceptual model, above-ground and subsurface performance, and
site closure strategy. The evaluation includes reviewing site documents, visiting the site for up to 1.5
days, and compiling a report that includes recommendations to improve the system. Recommendations
with cost and cost savings estimates  are provided in the following four categories:

    •  Improvements in remedy effectiveness
    •  Reductions in operation and maintenance  costs
    •  Technical improvements
    •  Gaining site closeout

The recommendations are intended to help the site team identify opportunities for improvements. In
many cases, further analysis of a recommendation, beyond that provided in this report, may be needed
prior to implementation of the recommendation. Note that the recommendations are based on an
independent evaluation by the RSE team, and represent the opinions of the RSE team. These
recommendations do not constitute requirements for future action, but rather are provided for the
consideration of all stakeholders.

The Ace Services Superfund Site is located near the east edge of the city of Colby in Thomas County,
Kansas. The site is a former plating  facility that was operated between 1954  and 1969 by Northwest
Manufacturing Facility and between 1969 and 1989 by ACE Services. The site soils were impacted by
chromium and lead compounds and ground water was impacted with hexavalent chromium as a result of
these historical activities.  The site contamination  has been divided into two Operable Units (OUs). The
OU1 remedy, which was completed  in 2000, addressed existing buildings. The OU2 remedy utilizes a
pump and treat (P&T) system to address ground water contamination of a sole source aquifer. The treated
ground water from the P&T system is beneficially reused by the City of Colby, Kansas public water
supply system. In 2006, the P&T system satisfied 51% of the demand for potable water to the City of
Colby. This RSE focuses on the OU2 remedy, which is now entering the fifth year of a  10-year Long-
Term Remedial Action (LTRA) before being transferred to the State of Kansas for operation and
maintenance (O&M). A granular activated carbon (GAC) pre-treatment system pre-treats the treatment
system influent for volatile organic compounds from an upgradient leaking underground storage tank site.
This pre-treatment system is managed under the KDHE Petroleum Storage Tank Release Program, and
direct review of that pre-treatment system was not included in this RSE.

In general, the RSE team found a well-operated system. The observations and recommendations
contained in this report are not intended to imply a deficiency in the work of either the system designers
or operators, but are offered as constructive suggestions in the best interest of the EPA, the public, and the
facility. These recommendations have the benefit of being formulated based on operational data
unavailable to the original designers.

Recommendations are provided in all four of the categories: effectiveness, cost reduction, technical
improvement, and site closure. The  recommendations for improving system  effectiveness are as follows:

-------
    •   The site team should revise their methods of evaluating capture. This should involve a revised
       potentiometric map that does not include water levels from actively pumping extraction wells.
       Additionally, the capture zone evaluations should consider other lines of evidence including a
       comparison of extraction rates to calculated ground water flow through the plume and
       concentration trends in downgradient monitoring wells.

    •   The site team should pump for six months at extraction wells where extraction has been
       temporarily discontinued and concentrations have risen substantially or have risen above cleanup
       standards.  This includes EX-5I/D, which increased above cleanup standards as of the Spring
       2007 sampling event.  This pumping would result in an estimated cost of $43,000 for 2007
       assuming a flow rate of 100 gpm maintained over 6 months. The  site team will then need to
       decide if pumping should continue until concentrations are consistently below cleanup standards
       or consistently undetectable. This decision has larger implications for operation of the P&T
       system in general.  Continuing to operate extraction wells until concentrations are undetectable as
       voiced during the RSE process (rather than until cleanup standards are met) could extend the
       duration of the remedy by several years.

Recommendations  for cost reduction include the following:

    •   It is suggested that extraction rates be modified to reduce the cost of resin without sacrificing
       protectiveness.  It is recommended that extraction from EX-ID and EX-2D can be discontinued
       since extraction from these deeper wells may be contributing to the downward migration of
       contaminants and concentrations at these wells have been below cleanup standards for the past
       four sampling events.  Additionally, pumping could be discontinued at EX-4I/D since
       concentrations at wells and upgradient of this  well are below cleanup standards. The site team
       reported a cost of resin at 0.164 cents per gallon of water treated. Discontinuing pumping at EX-
       ID and EX-2D will result in savings of approximately $156,000 annually.  If the site team
       chooses to  discontinue pumping from EX-4I/D, an additional savings of $86,000 annually could
       be realized.

    •   The RSE team suggests revising the ground water monitoring program from 71 wells sampled
       semi-annually (excluding residential sampling) to 56 wells sampled annually and 44 wells
       sampled semi-annually (also excluding residential sampling). This modification would result in
       annual savings of approximately $25,000.

    •   The total project management costs are high relative to other Fund-lead P&T systems. The RSE
       team believes that sufficient project management, technical support, and routine audits could be
       performed  for approximately $108,000 per year. This would result in an annual savings of
       approximately $34,000. Some of the savings  might be achieved by using vendor assistance and
       local expertise as technical resources to offset some of the involvement by the design engineer.
       Savings may also be realized by modifying the reporting format for the quarterly audit process.

In total, the RSE team identifies approximately $215,000 per year in potential savings. Recommendations
for technical improvement and gaining site closure include the following:

    •   Because the remedy may achieve cleanup standards in a reasonable time frame, the  site team
       should continue to look for ways to reuse equipment and simplify operations rather than paying
       for replacement of expensive automation controls and equipment.
                                           in

-------
    •  The site team should prepare a map to illustrate the results of previous soil investigations and
       excavations to help understand the potential for future leaching of soil contamination to ground
       water.

    •  An initial increase followed by a decrease in contamination at a well immediately downgradient
       of the source area has raised concern that soil contamination may continue to act as a potential
       source to ground water contamination. The increase and subsequent decrease might also be
       explained by a redistribution of existing ground water contamination when the P&T system began
       operation.  The RSE team recommends continuing to operate the P&T system and monitoring for
       potential future concentration increases to see if soil is acting as a continuing source. However, if
       the site team is concerned about the soil contamination and would like to take a more proactive
       approach, the RSE team has provided an approach for the site team's consideration. It consists of
       two steps: a preliminary investigation followed by a follow-up investigation and soil flushing.
       The soil flushing would include improved ground water capture in the immediate source area.
       The estimated cost for the preliminary investigation is approximately $55,000, and the estimated
       cost for the follow-up investigation and remediation is approximately $400,000, including two
       years of operation.

A table summarizing the recommendations, including estimated  costs and/or savings associated with
those recommendations, is presented in Section 7.0 of this report.
                                            IV

-------
                                       PREFACE
This report was prepared as part of a project conducted by the United States Environmental Protection
Agency Office of Superfund Remediation and Technology Innovation (U.S. EPA OSRTI) in support of
the "Action Plan for Ground Water Remedy Optimization" (OSWER 9283.1-25, August 25, 2004). The
objective of this project is to conduct Remediation System Evaluations (RSEs) at selected pump and treat
(P&T) systems that are jointly funded by EPA and the associated State agency. The project contacts are
as follows:
           Organization
    Key Contact
       Contact Information
U.S. EPA Office of Superfund
Remediation and Technology
Innovation
(OSRTI)
Charles Sands
2777 South Crystal Drive
5th Floor
Mail Code 5204P
Arlington, VA 22202
phone: 703-603-8857
sands.charles@epa.gov
Dynamac Corporation
(Contractor to U.S. EPA)
Daniel F. Pope
Dynamac Corporation
3601 Oakridge Boulevard
Ada, OK 74820
phone: 580-436-5740
fax: 580-436-6496
dpope@dynamac.com
GeoTrans, Inc.
(Contractor to Dynamac)
Doug Sutton
GeoTrans, Inc.
2 Paragon Way
Freehold, NJ 07728
phone: 732-409-0344
fax: 732-409-3020
dsutton@geotransinc .com

-------
                         TABLE OF CONTENTS
NOTICE	i
EXECUTIVE SUMMARY	ii
PREFACE	v
TABLE OF CONTENTS	vi
1.0  INTRODUCTION	1
    1.1 PURPOSE	1
    1.2 TEAM COMPOSITION	2
    1.3 DOCUMENTS REVIEWED	2
    1.4 PERSONS CONTACTED	2
    1.5 SITE LOCATION, HISTORY, AND CHARACTERISTICS	3
       1.5.1    LOCATION	3
       1.5.2   HISTORICAL PERSPECTIVE	3
       1.5.3    POTENTIAL SOURCES	4
       1.5.4   HYDROGEOLOGIC SETTING	4
       1.5.5    POTENTIAL RECEPTORS	5
       1.5.6   DESCRIPTION OF GROUND WATER PLUME	5
2.0  SYSTEM DESCRIPTION	7
    2.1 SYSTEM OVERVIEW	7
    2.2 EXTRACTION SYSTEM	7
    2.3 TREATMENT SYSTEM	8
    2.4 MONITORING PROGRAM	8
3.0  SYSTEM OBJECTIVES, PERFORMANCE, AND CLOSURE CRITERIA	9
    3.1 CURRENT SYSTEM OBJECTIVES AND CLOSURE CRITERIA	9
    3.2 TREATMENT PLANT OPERATION STANDARDS	9
4.0  FINDINGS AND OBSERVATIONS FROM THE RSE SITE VISIT	10
    4.1 FINDINGS	10
    4.2 SUBSURFACE PERFORMANCE AND RESPONSE	10
       4.2.1    WATERLEVELS	10
       4.2.2   CAPTURE ZONES	10
       4.2.3    CONTAMINANT LEVELS	12
    4.3 COMPONENT PERFORMANCE	13
       4.3.1    EXTRACTION SYSTEM	13
       4.3.2   EQUALIZATION TANKS	13
       4.3.3    BAG FILTERS	13
       4.3.4   ION EXCHANGE	14
       4.3.5    CHLORINATION SYSTEM	14
    4.4 COMPONENTS OR PROCESSES THAT ACCOUNT FORMAJORITY OF ANNUAL COSTS	14
                                 VI

-------
       4.4.1   UTILITIES	14
       4.4.2   NON-UTILITY CONSUMABLES AND DISPOSAL COSTS	14
       4.4.3   LABOR	15
       4.4.4   CHEMICAL ANALYSIS	15
    4.5 RECURRING PROBLEMS OR ISSUES	15
    4.6 REGULATORY COMPLIANCE	15
    4.7 TREATMENT PROCESS EXCURSIONS AND UPSETS, ACCIDENTAL CONTAMINANT/REAGENT
       RELEASES	15
    4.8 SAFETY RECORD	15
5.0  EFFECTIVENESS OF THE SYSTEM TO PROTECT HUMAN HEALTH AND THE
    ENVIRONMENT	16
    5.1 GROUND WATER	16
    5.2 SURF ACE WATER	16
    5.3 AIR 	16
    5.4 SOIL	16
    5.5 WETLANDS AND SEDIMENTS	17
6.0  RECOMMENDATIONS	18
    6.1 RECOMMENDATIONS TO IMPROVE EFFECTIVENESS	18
       6.1.1   MODIFY METHODS OF EVALUATING CAPTURE ZONE	18
       6.1.2   RE-START PUMPING AT EXTRACTION WELLS WHERE CONCENTRATIONS HAVE
              INCREASED ABOVE STANDARDS	19
    6.2 RECOMMENDATIONS TO REDUCE COSTS	19
       6.2.1   REVISE EXTRACTION WELL PUMPING	19
       6.2.2   SUGGESTIONS FOR GROUND WATER MONITORING	20
       6.2.3   REDUCTIONS IN PROJECT MANAGEMENT CONSISTENT WITH STEADY STATE
              SYSTEM OPERATION	21
    6.3 RECOMMENDATIONS FOR TECHNICAL IMPROVEMENT	22
       6.3.1   CONTINUE RE-USING ON-SITE EQUIPMENT RATHER THAN PURCHASE NEW
              EQUIPMENT	22
       6.3.2   PREPARE MAP ILLUSTRATING RESULTS OF SOIL EXCAVATIONS	22
    6.4 CONSIDERATIONS FOR GAINING SITE CLOSE Our	22
       6.4.1   POSSIBLE APPROACH TO EVALUATING AND ADDRESSING REMAINING SOIL
              CONTAMINATION THAT MAY SERVE AS A CONTINUING SOURCE OF GROUND
              WATER CONTAMINATION	22
7.0  SUMMARY	24
Figure 1-1     Location of Shallow Monitoring Wells
Figure 1-2     Location of Intermediate Monitoring Wells
Figure 1-3     Location of Deep Monitoring Wells

Appendix:     Report Comments and Responses
                                  vn

-------
                                1.0    INTRODUCTION
1.1     PURPOSE

During fiscal years 2000 and 2001 Remediation System Evaluations (RSEs) were conducted at 20 Fund-
lead pump and treat (P&T) sites (i.e., those sites with pump and treat systems funded and managed by
Superfund and the States). Due to the opportunities for system optimization that arose from those RSEs,
EPA OSRTI has incorporated RSEs into a larger post-construction complete strategy for Fund-lead
remedies as documented in OSWER Directive No. 9283.1-25, Action Plan for Ground Water Remedy
Optimization. OSRTI has since commissioned RSEs at additional Fund-lead sites with P&T systems. An
independent EPA contractor is conducting these RSEs, and representatives from EPA OSRTI are
participating as observers.

The RSE process was developed by the US Army Corps of Engineers (USAGE) and is documented on the
following website:

              http://www.environmental.usace.army.mil/library/guide/rsechk/rsechk.html

An RSE involves a team of expert hydrogeologists and engineers, independent of the site, conducting a
third-party evaluation of site operations. It is a broad evaluation that considers the goals of the remedy,
site conceptual model, above-ground and subsurface performance, and site closure strategy.  The
evaluation includes reviewing site documents, visiting the site for up to 1.5  days, and compiling a report
that includes recommendations to improve the system.  Recommendations with cost and cost savings
estimates are provided in the following four categories:

   •   Improvements in remedy effectiveness
   •   Reductions in operation and maintenance costs
   •   Technical  improvements
   •   Gaining site closeout

The recommendations are intended to help the site team (the responsible party and the regulators) identify
opportunities for improvements. In many cases, further analysis of a recommendation, beyond that
provided in this report, may be needed prior to implementation of the recommendation.  Note that the
recommendations are based on an independent evaluation by the RSE team, and represent the opinions of
the RSE team. These recommendations do not constitute requirements for future action, but rather are
provided for the consideration of all site stakeholders.

The Ace Services Superfund Site (the Site) was selected by EPA OSRTI based on a recommendation
from EPA Region  7.  The Kansas Department of Environmental Health (KDEH) has expressed concern
over a recent spike in chromium levels in the Ace Recovery Wells that may indicate leaching of source
area contamination. Additionally the site team is looking for cost-reduction strategies that will allow the
system to more cost-effectively maintain its designed level of protectiveness. This report provides a brief
background on the site and current operations, a summary of observations made during a site visit, and
recommendations regarding the remedial approach. The cost impacts of the recommendations are also
discussed.

-------
1.2    TEAM COMPOSITION

The team conducting the RSE consisted of the following individuals:

       Peter Rich, Civil and Environmental Engineer, GeoTrans, Inc.
       Doug Sutton, Water Resources Engineer, GeoTrans, Inc.
       Erin Pettypiece, Geologist, GeoTrans, Inc.

The RSE team was also accompanied by the following observers:

       Chuck Sands from EPA OSRTI
       Glynis Hill from EPA OSRTI
       Ashley Allen from KDHE
       Leo Henning from KDHE
1.3    DOCUMENTS REVIEWED
Author
U.S. EPA
U.S. EPA
BVSPC
BVSPC
BVSPC
U.S. EPA
BVSPC
BVSPC
BVSPC
U.S. EPA
BVSPC
BVSPC
BVSPC
U.S. EPA
MILCO
BVSPC
Date
10/1998
05/05/1999
11/13/2000
12/14/2000
07/06/2001
09/13/2001
9/2003
10/2003
9/2003
9/2003
2006
2006
3/2006
1 1/2006
8-11/2006
6/2007
Title
Remedial Investigation Report
Record of Decision
Technical Memorandum - Pump Test Results
Technical Memorandum - Groundwater Modeling Activities
Technical Memorandum - Groundwater Modeling Activities
Record of Decision Amendment
Interim Remedial Action Report
Remedial Action Report
Remedial Action Report Demolition Summary
Preliminary Close Out Report
Long Term Response Action, Cleanup Status Reports,
1/04/2006 and 6/08/2006
Long Term Response Action, Audit Reports, 1 1/29/2006,
7/28/2006, 5/24/2006, and 3/03/2006
General System O&M Manual, Ground Water Treatment
Plant Volume I & II
Annual O&M / Remedy Evaluation Checklist
Quarterly O&M and Monitoring Report, Hi-Plains Coop and
Granular Activated Carbon System
Spring 2007 Ground Water Sampling Data
1.4    PERSONS CONTACTED
The following individuals associated with the site were present for the visit:

       Rob Weber, PG, Environmental Scientist/Remedial Project Manager, EPA Region 7
       Gary Felkner, Senior Geologist, Black & Veatch
       Curt McCoy, Construction Manager, Black & Veatch

-------
       Ken Wyatt, Project Manager, Black & Veatch
       Jim Helus, Plant Operator, City of Colby


1.5     SITE LOCATION, HISTORY, AND CHARACTERISTICS

1.5.1         LOCATION

The Ace Services Superfund Site is located in a light commercial/industrial area near the east edge of the
city of Colby, Thomas County, Kansas. The site address is 500 East Fourth Street. To the north, the site
is bordered by Fourth Street. A church and a hardware store are located to the east and west, respectively.
Vacant land is located to the south of the site. For the purposes of this RSE report, the site refers to the
Ace Services Property unless otherwise noted.

Site characterization and remediation has been divided into two operable units (OUs): OU1 addressed
buildings associated with historic facility operations and OU2 addresses contaminated ground water. The
OU1 remedy consisted of the removal and disposal of hazardous wastes from the interior of the buildings.
The OU1 remedy was completed in February 2000 (seven years prior to the RSE). The OU2 remedy
consists of the extraction of contaminated ground water from a sole source aquifer, ground water
treatment using ion exchange resins, and discharge of treated ground water to the Prairie Dog Creek
Tributary or to the City of Colby drinking water supply. To date, the treated ground water from the P&T
system has beneficially reused by the City of Colby, Kansas public water supply system, satisfying 51%
of the demand for potable water to the City of Colby in 2006. During the demolition and excavation of
the Ace Services facility, chromium contaminated soil was discovered. The contaminated soil was
excavated to 15 feet then backfilled with clean fill. This RSE focuses on the OU2 ground water remedy,
but considers residual soil contamination that could potentially serve as a continuing source of ground
water contamination. A granular activated carbon (GAC) pre-treatment system  pre-treats the Ace
Services treatment system influent for volatile organic compounds from the upgradient Hi-Plains Co-Op
leaking underground storage tank site.  Although this  pre-treatment system is managed under the KDHE
Petroleum Storage Tank Release Program, the Ace Services system operators monitor the GAC system
through sample log sheets and  by observing electronic critical flow and pressure data from the GAC
system.  Direct review of Hi-Plains Co-Op pre-treatment system is not included in this RSE.


1.5.2         HISTORICAL PERSPECTIVE

The Ace Services property was operated as a plating facility between 1954 and  1989. Northwest
Manufacturing Facility operated the facility from 1954 to  1969 when Ace Services took over the
operations. Ace Services terminated operations at the site in 1989 after losing corporate  status due to
failure to pay taxes and fees. During operation, parts  were transferred to and from plating vats.
Contaminants reportedly entered the environment from the plating vats, spills that occurred during the
transfer of parts, and as a result of a faulty waste water treatment plant.

    •  The site was added to the National Priorities List in September 1995.

    •  The Remedial Investigation and Risk Assessment occurred in October 1998.

    •  The Record of Decision for both OU1 and OU2 was issued in May 1999.

    •  The OU1 Remedial Design was completed in December 1999.

-------
    •  The OU1 Remedial Action was completed in February 2000.

    •  The Record of Decision was amended in September 2001.

    •  The OU2 Remedial Design was completed in 2002.

    •  The construction of the OU2 P&T system was completed August 12, 2003.

    •  The OU2 remedy operated for several months beginning in August 2003 before it was
       temporarily shut down in October 2003, due to VOC contamination detected in site monitoring
       and extraction wells from an upgradient source.

    •  Long-Term Remedial Action (LTRA) officially began in September 2003.

    •  The responsible party for the upgradient VOC contamination installed a GAC treatment unit and
       began operation of that unit in August 2004 to treat the extracted water prior to treatment by the
       Ace Services treatment plant.  The Ace Services treatment plant resumed operation on August 24,
       2004.

1.5.3          POTENTIAL SOURCES

The contaminants were reportedly released as a result of poor maintenance during chromium
electroplating operations, waste water discharge to the surface, and a faulty waste water treatment facility.
The source of chromium was the chromic acid solution used in the plating vats. Removal actions were
preformed between 1981 and 1994 to remove contaminated sludge, building debris,  soils and remaining
wastes. During the construction phase of OU2 in 2002 additional contaminated soils were discovered
beneath the Ace Services facility. Contaminated soils were excavated to a depth of 15 feet. Contaminated
soils remained in one area but were deemed not a threat to human health because they would be covered
with clean backfill and the treatment system.  Primary site-related compounds of concern are as follows:

    •  Hexavalent Chromium
    •  Total Chromium

Volatile organic compounds (VOCs) attributed to other contaminated sites (the High Plains Co-Op Site
upgradient of the Ace Services Site) are also present in ground water underlying the Site.  The High
Plains Co-Op Site is located across Fourth Street near the intersection of Nashville and Fifth Street, and
the ground water remedy at that site includes an air sparge system.  Contaminants associated with the
High Plains Co-Op Site  include 1,2-dichloroethane (1,2-DCA). The High Plains Co-Op Site has installed
a GAC unit east of the Site that pre-treats extracted water to remove VOCs prior to entering the Ace
Services site treatment plant.

1.5.4          HYDROGEOLOGIC SETTING

The Site is underlain by fill in some areas that is associated with excavation and demolition events
associated with OU2 construction activities.  Typically, the fill is approximately 2 to 3 feet thick, but in
some areas it is approximately 15 feet deep.

Underlying the site are unconsolidated deposits of quaternary age. These deposits consist of gravel, sand,
silt, and clay. These deposits are overlain by deposits of loess in  some areas, which are wind blown silt
deposits. The quaternary age deposits are underlain by unconsolidated sediments which are Miocene in

-------
age and are referred to as the Ogallala Formation. The unit is highly stratified and consists of sand,
gravelly sand, silt, and clay. This unit also contains thin interbedded caliche layers. Bedrock from the
Cretaceous Pierre Shale Formation underlies the unconsolidated formation. The site team has divided the
unconsolidated formation into three zones: the shallow, intermediate, and deep zones.

The shallow zone begins at 105 feet below ground surface (bgs) and is generally sand with gravel and
clay. It is approximately 40 feet thick. The intermediate monitoring and extraction wells at the site screen
regional ground water in the intermediate zone approximately 145 to 190 feet bgs. These sediments
consist of gravelly sand with thin clay lenses. At approximately 190 feet, there is a semi-confining layer
of clay and silty clay. This unit is approximately 17 feet thick. Underlying the semi-confining unit is the
deep zone, which consists of gravelly sand with thin clay lenses. The gravely sand is approximately 23
feet in thickness. Bedrock is encountered at approximately 230 feet bgs.  Site maps with well locations
for the shallow, intermediate, and deep zones are provided on Figures 1-1, 1-2, and 1-3.

The depth to the regional water table is approximately 90 feet bgs, but this depth has been increasing as a
result of decreasing water elevation in the Ogallala Formation. Locally, flow in the intermediate and deep
zones is to the east-southeast. The  hydraulic gradient is approximately 0.0022 to 0.0032 feet per foot.
Hydraulic conductivity has been calculated to range from 53.1 feet per day to 71.7 feet per day in the
intermediate zone and 10.4 feet per day to 153.4 feet per day in the deep zone based on pump tests
conducted during the pre-design phase.

1.5.5          POTENTIAL RECEPTORS

The potential receptors for the  site are residential wells located downgradient of the site.  The city has
made city water hook up available to affected residents. Most residents have hooked up to city water but
have not abandoned their wells, making those residents potential receptors. Two residents have refused to
pay for city water and therefore still use their private wells as a drinking water source. All downgradient
residential wells are sampled semi-annually and residents receive a report summarizing the sample
results.

1.5.6          DESCRIPTION OF GROUND WATER PLUME

The site team tracks concentrations of hexavalent chromium. Concentrations are highest in the area
immediately downgradient of the original soil source area. The April 2003 baseline sampling event
provides information regarding contaminant transport in ground water after the soil contamination had
been removed during the demolition and excavation of existing site buildings but before the P&T system
began operation. In the shallow zone, the April 2003 results indicated that ground water with
concentrations above cleanup standards for chromium compounds had migrated approximately 1.4 miles
east of the former facility (e.g., east of the current treatment plant). Chromium concentrations above
cleanup standards were detected in MW-8S, MW-9S, MW-11S, MW-13S, MW-14S, MW-15S, OB-IS,
and OB-2S.

In the intermediate zone, April 2003 sampling suggested that contaminant migration was more extensive.
Chromium concentrations above cleanup standards were detected in MW-2I, MW-8I, MW-9I, MW-1II,
MW-12I, MW-13I, MW-14I, OB-1I, and OB-2I.

In the deep zone, April 2003 sampling suggests that contaminant migration was even more extensive.
Chromium concentrations above cleanup standards were detected in MW-2D, MW-6D, MW-9D, MW-
11D, MW-13D, MW-15D,  MW-18D, OB-ID, and OB-2D.

-------
With respect to vertical plume delineation the bedrock is considered the confining unit and it is located at
230 feet bgs. No sampling of the bedrock has been conducted at the site.

-------
                           2.0    SYSTEM DESCRIPTION
2.1     SYSTEM OVERVIEW

The P&T system has an Operational and Functional date of September 2003 and consists of an extraction
system, a treatment plant, and discharge to the City of Colby drinking water supply or to the Prairie Dog
Creek Tributary. The system is designed to contain site-related contamination and remove contaminant
mass. A GAC treatment unit was also installed offsite for pretreatment of VOCs associated with the Hi-
Plains Co-op Leaking Underground Storage Tanks Site.  The GAC is maintained by that group.
2.2     EXTRACTION SYSTEM

The extraction system includes 13 extraction wells, which are listed in the table below. There are four
shallow extraction wells, but none of those wells are currently operating. Due to low water levels, EX-2S
is not operating. EX-4S and EX-5S were turned off in October 2005 due to reduced contaminant
concentrations, and EX-3S was turned off in January 2007 due to reduced chromium concentrations.
There are five intermediate extraction wells. In October 2005, EX-5-I/D was turned off because the
detected chromium concentration was below the Maximum Contaminant Level (MCL) of 100 ug/L.
There are three deep extraction wells. EX-3D was shut down in January 2007 because the detected
chromium concentration was below the MCL. Additionally there is a public water supply well (PSW-8),
which has been converted into an extraction well that is currently operating. Each well head is enclosed in
a small heated and ventilated well house building and is piped to the treatment plant through a common
HOPE header pipe.  Flow from each well is controlled by actuated valves that are in turn controlled from
a programmable logic controller at the treatment plant. Isolation valves are included to allow the wells to
be taken offline. The following table summarizes the October 2006 extraction rates and contaminant
concentrations for each of those wells based on sampling data. The site team reports a total chromium
mass of 1,052 kg removed from the  site between June 2003 and October 2006.
Extraction Well
EX-l-I
EX-l-D
EX-2-S
EX-2-I
EX-2-D
EX-3-S
EX-3-I
EX-3-D
EX-4-S
EX-4-I/D
EX-5-S
EX-5-I/D
PSW-8
Total
Flow Rate
October 2006
(gpm)
70
70
0
100
100
0
50
0
0
100
0
0
125
615
Hexavalent Concentration
October 2006
(ug/L)
500
<10
—
80
21.6
12.2
72
12.3
<10
36.5
<10
67.5
190


-------
2.3     TREATMENT SYSTEM

The treatment system consists of the following treatment components:

    •  One 250,000-gallon influent water storage tank
    •  Two lines of bag filters each consisting of four 5 micron bag filters
    •  Two ion exchange process trains, each consisting of three 600 cubic foot ion exchange beds
       arranged in a lead/lag/spare configuration
    •  One 250,000-gallon effluent water storage tank
    •  Chlorination system
    •  600 cubic foot resin transfer vessel
    •  Associated gauges, meters, mixers, pumps, and controls

The system was designed for a capacity of 1,000 gpm with redundant features to prevent downtime.


2.4     MONITORING PROGRAM

Ground Water Monitoring

A semi-annual ground water monitoring program that includes sampling all wells has been established for
the site. The most recent sampling event occurred in October 2006 and consisted of sampling 48
monitoring wells,  six observation wells, nine residential wells, two Hi-Plain Co-op monitoring wells, the
Ace Recovery Well (at three intervals), 12 extraction wells (three not operating), and PWS-8 (the former
public water supply well) for total chromium and field parameters including temperature, specific
conductivity, pH, turbidity, dissolved oxygen, and oxidation-reduction potential. Monitoring wells were
sampled using a conventional purge (three volumes or more) and sample method and extraction wells
were sampled through a sample port.  Laboratory analyses are provided by the Region 7 Laboratory at no
cost to the site. Ground water elevations were measured in all monitoring wells, including all extraction
wells. The results of the event were summarized in a concise report that provided potentiometric surface
maps for the intermediate and deep zones and contaminant concentration maps for total chromium.
Another sampling event took place in April 2007 at the time of the RSE site visit.

Process Monitoring

Process monitoring is conducted twice daily (morning and afternoon) at three locations: plant influent,
plant effluent, and the effluent to the city.  In the morning, an additional seven samples are collected:
downstream of the influent tank, downstream of bag filter BF-1, downstream of bag filter BF-2,
downstream of ion exchange train A lead vessel, downstream of ion exchange train A lag vessel,
downstream of ion exchange train B lead vessel, and downstream of ion exchange train B lag vessel. All
samples are analyzed for hexavalent chromium and pH. In addition, influent and effluent samples are
analyzed for total chromium. The daily analysis of the samples is performed at  the GWTP with a Hach
kit. Once a week, the morning samples are split and sent to an independent laboratory contracted through
an EPA cooperative  agreement with the City of Colby, Kansas.

-------
            3.0   SYSTEM OBJECTIVES, PERFORMANCE, AND
                               CLOSURE CRITERIA
3.1    CURRENT SYSTEM OBJECTIVES AND CLOSURE CRITERIA

The ROD stated the following language regarding the goals for the ground water remedy.

    •   Prevent ingestion, inhalation, or direct contact with ground water having chromium concentration
       in excess of current regulatory drinking water standards.

    •   Prevent further migration of chromium to prevent further degradation of natural resources.
The cleanup criteria established by the ROD for site-related contaminants are summarized in the
following table.
Contaminant of Concern
Chromium, Total
Cleanup Criteria
(ug/L)
100
3.2    TREATMENT PLANT OPERATION STANDARDS

Treated ground water is discharged to the Prairie Dog Tributary or to the City of Colby drinking water
supply. Discharge to the City of Colby drinking water supply is coordinated with the City of Colby.
Selected discharge criteria are provided in the following table.
Constituent
Chromium, Hexavalent
Chromium, Total
Discharge Criteria
(ug/L)
17
100
The effluent treatment plant routinely has undetectable levels of chromium, with the detection limit below
the discharge criteria.

-------
              4.0    FINDINGS AND OBSERVATIONS FROM THE
                                      RSE SITE VISIT
4.1     FINDINGS

The observations provided below are not intended to imply a deficiency in the work of the system
designers, system operators, or site managers but are offered as constructive suggestions in the best
interest of the EPA and the public. These observations have the benefit of being formulated based upon
operational data unavailable to the original designers. Furthermore, it is likely that site conditions and
general knowledge of ground water remediation have changed overtime.


4.2     SUBSURFACE PERFORMANCE AND RESPONSE

4.2.1         WATER LEVELS

Water levels collected from 58 monitoring wells along the plume confirm regional ground water flow to
the east-southeast and show influence from ground water extraction. Potentiometric surface maps
prepared by the site team and incorporated into the Cleanup Status Reports, however, include water levels
from active pumping wells, which tend to overestimate the influence of pumping. A more accurate
representation of the influence of pumping is to prepare the potentiometric surface map without water
levels from operating extraction wells and rely on water levels from monitoring wells that are near
operating extraction wells. Fortunately, at this site, most of the extraction wells have nearby monitoring
wells.

Water levels from monitoring wells indicate a downward vertical gradient that has been intensified by
higher extraction rates from deeper wells than from shallow wells.  This is evident by reviewing water
levels from the October 2006 sampling event at the MW-1 and MW-2 clusters. MW-1 is located
upgradient of the site and is approximately 500 feet up/sidegradient from the nearest extraction well.
Based on this event, the downward gradient at the MW-1  cluster is 0.0016 feet per foot (a difference in
water levels of 0.15 feet over 95 feet).  The MW-2 cluster is located near the EX-1 cluster where pumping
occurs from the intermediate and deep extraction wells. The downward vertical gradient at this location
is 0.037, which is more than a factor of 20 higher than in non-pumping locations. This high gradient
indicates that extraction from intermediate and deep wells pulls water from the shallow zone and
contributes to capture of shallow ground water contamination. It also, however, increases the vertical
gradient, which likely draws contamination into the deep zone and perpetuates pumping  from deep
extraction wells.

4.2.2         CAPTURE ZONES

Four different lines of evidence are typically appropriate for evaluating capture at a site like this:

    •  A comparison of ground water flowing through the contaminated area with the amount of ground
       water being extracted
    •  Evaluation of potentiometric surface maps
    •  Evaluation of trends in contaminant concentrations
    •  Ground water modeling with particle tracking
                                          10

-------
The following equation is useful for evaluating the first line of evidence.

                                      Q>WxCxBxKxixf

    Q - Extraction rate
    W- Width of capture zone
    B - Saturated thickness
    K - Hydraulic conductivity
    / - Hydraulic gradient
   /- Safety factor of 2 to account for heterogeneity and other factors
    C - Conversion factor - 0.00518 gpm/ft3/day

Typically, for adequate capture, the extraction rate (left-hand side of the equation) is two or more times
higher than the amount of water flowing through the contaminated zone. The right-hand side of the
equation represents this flow rate and the factor of safety (/). The following table summarizes the input
data for this equation and indicates if capture appears to be adequate based on this line of evidence. The
analysis is done for current site conditions. Therefore, a relatively narrow plume is considered as is
extraction from EX-1, PSW-8, and EX-2.
Zone
Shallow
Intermediate
Deep
Actual
Q1
(gpm)
25
245
195
Width2
(feet)
400
400
400
Hydraulic
Gradient3
(feet/foot)
0.0032
0.0032
0.0032
Saturated
Thickness4
(feet)
35
65
25
Hydraulic
Conductivity3
(feet/day)
37
62
43
Right-Hand
Side of
Equation
(gpm)
17
53
14
 Extraction from PSW-8 is apportioned as follows 20% shallow, 60% intermediate, and 20% deep.
2 Conservative based on contaminant contours presented by site contractor, which are interpreted based on relatively sparse
data for delineating the plume width.
3 As reported in modeling report prepared by site contractor
4 Interpreted from cross-section in Cleanup Status Report

Capture appears to be adequate in each of the three intervals based on this simple calculation because the
actual pumping rate (Q) is greater than the right hand side of the equation.  It is noted, however, that such
simple calculations require simplifying assumptions such as homogeneous, isotropic, confined aquifer
with infinite extent, uniform aquifer thickness, fully penetrating wells, uniform regional horizontal
hydraulic gradient, steady-state flow, negligible vertical gradient, no net recharge, and no other water
sources introduced to  aquifer due to extraction.  Most of the assumptions are not satisfied at this site.
However, based on the much greater calculated capture widths compared to the actual plume widths,
especially in the intermediate and deep zones, it appears that the analysis is conservative and error
associated with the assumptions would likely not change the conclusions from this line  of evidence.

The use of water levels from operating extraction wells biases the potentiometric surface maps in favor of
capture.  Therefore, the potentiometric surface maps from the existing Cleanup Status Reports are not
reliable for evaluating plume capture.  The potentiometric surface maps could be prepared without the use
of water levels from operating extraction wells, and then used for evaluating capture along with the other
lines of evidence presented here.

Using concentration trends at monitoring wells downgradient of extraction wells can provide evidence of
capture; however, the analysis will take several rounds of monitoring data to obtain useful results. The
peak in chromium contamination, which was in the ARW well in April 2005, can be used in conjunction
                                             11

-------
with concentrations measured in subsequent events at downgradient wells over the next several
monitoring events. The flow parameters used above and an effective porosity of 0.25 suggest that
contaminant transport velocities are approximately 0.5 feet per day for the shallow and deep zones and
approximately 1 foot per day for the intermediate zone. PSW-8 and the MW-8 cluster are located
approximately 1,000 feet downgradient of the ARW well. If capture provided by EX-1 is adequate, then
concentrations at PSW-8 should decrease and the concentrations at MW-8 should remain low or
undetectable.  If capture provided by EX-1 is not adequate, the concentrations at PSW-8 and MW-8 will
likely increase within approximately 3 to 6 years (e.g., between 2008 and 2011) assuming the parameters
above are accurate. It should be noted that pumping downgradient of EX-1, such as extraction from
PSW-8, might actually compromise capture provided by EX-1.

Numerical modeling is beyond the  scope of this RSE, but the numerical modeling conducted by the site
team during design appears adequate.  It was calibrated based  on pumping and non-pumping conditions,
simulated and observed heads compared relatively well, and a sensitivity analysis was performed.
Current pumping rates from EX-1,  PSW-8, and EX-2 appear to be comparable to or exceed what was
simulated with the modeling.

Based on the above analysis, capture of the existing plume by  EX-1, PSW-8, and EX-2 appears to be
adequate at this site. However, this evaluation is heavily dependent on pump test data that was difficult to
interpret. Additional review of revised potentiometric surface maps and continued monitoring of
concentration trends at PSW-8 and the MW-8 cluster should provide  further evidence of capture.

4.2.3         CONTAMINANT LEVELS

Based on the October 2006 sampling event, the area of the plume has substantially decreased since
pumping began approximately 3.5 years prior to  the event. This suggests that upgradient extraction is
preventing contamination from  migrating to downgradient locations and that downgradient extraction has
effectively removed contamination. If the EX-1  cluster effectively captures the increase and subsequent
decrease in concentrations noticed at the ARW cluster, the plume will maintain its substantially reduced
size. Concentrations at the deep extraction wells have also substantially decreased. ARW-D is the only
deep sampling location with chromium contamination above the cleanup criteria (given that the
concentration reported for MW-4D on the 2006 Quarterly Clean Status Report Number 7, Figure 2-3 is  an
error based on historic sampling and the results of the Spring 2007 sampling event). The relatively low
concentrations in the deep aquifer suggest that deep extraction has effectively remediated the deeper
aquifer and that any sustained deep pumping may only serve to pull additional contamination deeper.

Contaminant concentrations in the ARW sampling locations indicated an increase during the first two
years of pumping  (April 2003 to April 2005) followed by a consistent decrease since April 2005. The
increase and subsequent decrease raises questions as to the cause of this concentration trend. Reasonable
suggestions are that it 1) represents movement of contaminants under a new pumping regime (i.e., the
start-up of the P&T system) or 2) represents contaminant mass that leached from the soil to the ground
water.  The horizontal transport time between the source area and the ARW sampling locations is on the
order of one to two years. Additional time would be needed for vertical migration to the ARW-I and
ARW-D locations, especially given the low-permeability units that separate the  shallow, intermediate,
and deep zones. Therefore, if the latter explanation is used, the contamination likely leached from the soil
around the time of soil removal and the treatment plant construction.
                                           12

-------
4.3     COMPONENT PERFORMANCE

4.3.1         EXTRACTION SYSTEM

The extraction wells are equipped with a high capacity stainless steel submersible centrifugal pumps. The
water is pumped through a buried HDPE collection piping system to the Hi-Plains Co-Op GAC pre-
treatment unit, which operates on the water pressure provided by the extraction pumps.  Water pre-treated
by the GAC system is then pumped to an influent holding tank at the treatment plant. The extraction well
pumps are intended to run continuously, however, a pressure transmitting type level sensor is mounted
inside the well casing to turn off the motor if water levels fall below the low level set point and to turn on
the motor when the high level set point is reached. If an extraction well experiences cycling due to
fluctuating water levels the average flow rate may be decreased. The flow rate for each well is controlled
automatically to a specified set point by the PLC through an actuated valve and flow meter located at each
well. Fiber optic wiring (rather than copper wiring) connects the actuated valves and flow meters to the
PLC to reduce potential equipment damage from lightning strikes. The extraction wells also have a
butterfly valve which isolates the extraction well piping for maintenance and two tee and ball valve
combinations which are used as a sampling port. The extraction well piping, valves, and controls are
housed in a heated and ventilated well house above each well.

4.3.2         EQUALIZATION TANKS

Prior to entering the equalization tank, ground water is pumped through the off-site GAC system to
remove VOCs associated with the upgradient Hi-Plains Co-Op leaking underground storage tank site.
The effluent from the GAC system is pumped to the 250,000-gallon equalization tank located at the
treatment plant, which also receives flow from the process sump and the recycle line. Water from the
influent tank enters the ground water treatment plant.

The effluent equalization tank accumulates water after it has been run through either ion exchange train,
but prior to entering the chlorination system. Water from the effluent tank is either sent to the chlorination
system and then to the  city of Colby water supply, or is discharged directly to the Prairie Dog Creek
tributary.

Each equalization tank contains a low level sensor which triggers an alarm when the tank is at 12%
capacity. When the tanks are at 8% capacity a low-low level sensor shuts down the pumps removing
water from the tank. After a low-low alarm has been triggered a low-maintain level control automatically
restarts the pumps when the tank reaches 33% capacity. Each tank also contains a high level sensor which
triggers an alarm when the tank is at 85% capacity. When the tanks are at 90% capacity a high-high level
sensor shuts down pumps pumping water to the tank. When a tank returns to 67% capacity after a high-
high level  alarm a high-maintain level control automatically restarts the pumps.

4.3.3         BAG FILTERS

Bag filters are provided in two trains each containing four parallel bag filters. The bag filter housings
contain a 5 micron bag. The bag filters are located in between the raw water pumps and the ion exchange
vessels. Bag filter change outs are infrequent, typically on the order of every two months.  Only three bag
filters in each train are needed to operate the system, and valves are in place to allow the system to
operate continuously while one of the four bags in each train is replaced. The bag filters have been
effective at removing carbon fines that enter the process stream from the GAC pre-treatment unit.
                                          13

-------
4.3.4
ION EXCHANGE
The ion exchange vessels are grouped into two trains each containing three vessels: a lead vessel, a lag
vessel, and a standby vessel. As the process water passes though both the vessels the hexavalent
chromium is exchanged for chloride. When chromium break though begins to occur, the lag vessel is
moved into the lead position and the standby unit is moved into the lag position. Each vessel is capable of
being isolated and assigned to any position in the process train. This rotation of resin allows the spent
resin to be replaced without shutting down the system. Resin is delivered to the site in a 600 cubic foot
tanker which is able to park in the building. The virgin resin is sluiced into a resin transfer vessel to be
held while the spent resin is removed. The virgin resin is then sluiced into the empty vessel, which
becomes the standby vessel. Spent resin is removed from the site and disposed of at an offsite facility.
4.3.5
CHLORINATION SYSTEM
The chlorination system is housed in a Chlorination Shelter located outside the ground water treatment
building between the influent and effluent tanks.  Water enters the chlorination system from the effluent
equalization tank.  Chlorine is stored in pressurized cylinders with regulators which control the amount of
chlorine being added. Disinfected water is discharged from the chlorination system into the city water
distribution system.

4.4     COMPONENTS OR PROCESSES THAT ACCOUNT FOR MAJORITY OF
            ANNUAL COSTS

Annual O&M costs are approximately $1,050,000 per year as summarized below.
Item Description
Labor: BVSPC oversight and project management
Labor: System operation
Ground water sampling and reporting (labor and analytical)
Utilities: Electricity
Non-electric utilities and other services
Non-utility consumables, disposal, and small repairs
Treatment plant analytical costs
Total Estimated Annual Cost
Estimated Annual Cost
$142,000
$50,000
$110,000
$120,000
$60,000
$540,000
$28,000
$1,050,000
4.4.1
UTILITIES
Utilities costs are divided between electricity and non-electricity services.  The electricity cost from the
utility is estimated by the site contractor as $120,000 per year.

Non-electric utilities and other services include potable water, garbage collection, cell phones, telephone,
portable toilets, cable internet service, repairs, and shipping. The cost estimate for these non-electric
utilities is approximately $60,000 per year.
4.4.2
NON-UTILITY CONSUMABLES AND DISPOSAL COSTS
The consumables category includes chemicals and resin.  Chemical usage is negligible relative to resin
usage; therefore these costs represent resin usage. The main system cost, over half, is due to resin usage,
which is directly related to system flow rates. Recent resin usage has been about 40 million gallons per
                                          14

-------
resin vessel. Resin usage, for FY2007, at the current 615 gpm flow rate, is projected at four changeouts
of two 600 cubic foot vessels (one in each train) at a cost of $135,000 per changeout or $540,000
annually, which represents a decrease from the $798,000 budgeted in previous years.

4.4.3         LABOR

There are three general areas involving labor: contractor project management, operator labor, and ground
water sampling. The contractor project management is approximately $142,000 per year. The operator
labor is approximately $50,000 per year.  The ground water sampling labor (and associated equipment
and analytical) is approximately $110,000 per year.

4.4.4         CHEMICAL ANALYSIS

The chemical analysis costs represent costs for analyzing treatment plant compliance samples.  Chemical
analysis for the ground water sampling is provided by the Region 7 Laboratory at no cost to the site
budget.


4.5     RECURRING PROBLEMS OR ISSUES

The site team reported recurring problems power outages occurring in two of the extraction wells. Due to
their distance from the treatment plant the power for these wells is supplied by a different provider.


4.6     REGULATORY COMPLIANCE

The treatment plant has routinely met discharge standards since operations began in October 2003.


4.7     TREATMENT PROCESS EXCURSIONS AND UPSETS, ACCIDENTAL
            CONTAMINANT/REAGENT RELEASES

There have been no reported major upsets or accidents since the plant began operations in October 2003.


4.8     SAFETY RECORD

The site team reports no health and safety reportable incidents for the treatment plant.  The site team had
no unaddressed concerns for potential safety issues.
                                        15

-------
     5.0    EFFECTIVENESS OF THE SYSTEM TO PROTECT HUMAN
                         HEALTH AND THE ENVIRONMENT
5.1     GROUND WATER

The ground water potential points of exposure are residential wells located approximately 1.5 miles from
the site. Data to date suggest that the contamination in this area has been remediated and is no longer
present. All residential wells have reported levels of chromium concentrations below the MCL since April
2003. In addition, the treatment plant routinely discharges water with undetectable chromium
concentrations and adequate chlorine residual to the city water supply. As a result, the RSE team believes
that the current remedy is likely protective of human health with respect to preventing contamination of
the residential wells.


5.2     SURFACE WATER

The contaminated ground water is captured or attenuates prior to discharging to surface water, and the
effluent from the treatment plant consistently meets the discharge criteria. As a result, the RSE team
believes that the current remedy is likely protective of human health and the environment with respect to
surface water.


5.3     AIR

Chromium and lead dust were addressed as part of OU1. Hexavalent chromium has been identified as a
threat to human health through inhalation when associated with plating operations. The OU1 remedy has
reportedly covered remaining chromium contamination in the soil, and the RSE team did not further
evaluate the OU1 remedy as part of the RSE.


5.4     SOIL

In 1992, contaminated soils were identified in the lagoon soils east of the Ace Services facility and
beneath the troughs within the facility. In 1994, as part of a remediation effort conducted by the USEPA,
contaminated soils, concrete, and structures were removed from the site. Cleanup goals for soils were
1,500 mg/kg total chrome and 500 mg/kg total lead. Contaminated soil was left in place due to limitations
of the excavation equipment. Samples of the soils left in these location indicated chrome concentrations
of 1,900 mg/kg to 2,400 mg/kg. The bottom of the  excavation was covered with sodium metabisulfite and
backfilled with clean soil and topped with concrete. Approximately 500 tons of soil was excavated from
the lagoon and verification samples indicated that lagoon soils no longer exceeded the action levels.
During OU1 demolition and construction activities chromium contaminated soils were encountered
beneath the Ace Services building slab. Soil was excavated to a depth of up to 15 feet in some locations.
Remaining contamination was backfilled over with clean fill and deemed not a threat to human health
because the ground water treatment plant would serve as a cap.
                                          16

-------
5.5    WETLANDS AND SEDIMENTS



Wetlands and sediments are not potential receptors of the ground water contamination of this site.
                                     17

-------
                            6.0    RECOMMENDATIONS
Cost estimates provided herein have levels of certainty comparable to those done for CERCLA Feasibility
Studies (-30%/+50%), and these cost estimates have been prepared in a manner consistent with EPA 540-
R-00-002, A Guide to Developing and Documenting Cost Estimates During the Feasibility Study, July,
2000.


6.1     RECOMMENDATIONS TO IMPROVE EFFECTIVENESS

6.1.1        MODIFY METHODS OF EVALUATING CAPTURE ZONE

Four different lines of evidence are typically appropriate for evaluating capture at a site like this:

    •  A comparison of ground water flowing through the contaminated area with the amount of ground
       water being extracted
    •  Evaluation of potentiometric surface maps
    •  Evaluation of trends in contaminant concentrations
    •  Ground water modeling with particle tracking

As demonstrated in Section 4.2.2, the  first line of evidence suggests that capture of the current plume is
adequate. The second line of evidence, however, is inconclusive because the site team currently prepares
potentiometric surface maps using water levels from active extraction wells, which biases the
potentiometric surface map in favor of capture. The third line of evidence will take additional time as the
site team continues to monitor decreasing concentrations in downgradient monitoring wells.  The fourth
line of evidence is numerical modeling. The design extraction rates determined by the modeling are
consistent with the ground water extraction rates that are evaluated as part of the first line of evidence.

The RSE team recommends that the site team prepare future potentiometric surface maps without using
water levels from operating extraction wells. There are monitoring wells near  some of the extraction  wells
that will be more representative of the influence that extraction has on water levels in the aquifer.
Although this potentiometric surface map may be more difficult to prepare, it will likely still demonstrate
capture and will be a more reliable indicator of capture than the current potentiometric surface maps.

The RSE team also recommends continuing to monitor PSW-8 and the MW-8 cluster and evaluate
concentration trends.  PSW-8 and the MW-8 cluster are located approximately 1,000 feet downgradient
of the ARW well.  If capture provided by EX-1 is adequate, then concentrations at PSW-8 should
continue to decrease and MW-8 should remain low/undetectable. If capture provided by EX-1 is not
adequate, the 2003 to 2005 increases at the ARW well will lead to concentration increases at PSW-8  and
MW-8 within approximately 3  to 6 years (e.g., between 2008 and 2011).

This evaluation of capture should require the same level of effort as the current data analysis and
presentation and should therefore not increase annual  costs.
                                          18

-------
6.1.2        RE-START PUMPING AT EXTRACTION WELLS WHERE CONCENTRATIONS HAVE
             INCREASED ABOVE STANDARDS

Due to the high cost of water treatment, the site team experiments with discontinuing pumping from
extraction wells where concentrations have decreased below standards. The RSE team agrees with this
approach and suggests discontinuing pumping from additional extraction wells (see Recommendation
6.2.1). If the concentrations increase above standards in an extraction well where pumping was recently
discontinued, then the site team should consider restarting pumping from that extraction well (e.g., EX-
5I/D based on the Spring 2007 sampling data).  Extraction should likely continue for the 6-month period
until the next sampling results are available and  reevaluated at that time. The cost of treating the water
from EX-5I/D for a six month period is approximately $43,000 based on an extraction rate of 100 gpm
and a resin usage cost of 0.164 cents per gallon treated.

The site team will then need to decide if pumping should continue until concentrations are consistently
below cleanup standards or consistently undetectable. This decision represents a larger issue. The site
team will need to determine if P&T operation in general will continue until cleanup standards are
uniformly met or until concentrations are undetectable. The decision for operating the system until
concentrations are undetectable could extend the life of the remedy by several years.
6.2     RECOMMENDATIONS TO REDUCE COSTS

6.2.1        REVISE EXTRACTION WELL PUMPING

The review of the water levels in Section 4.2.1 suggests that in the absence of pumping, the vertical
hydraulic gradient is similar in magnitude to the horizontal hydraulic gradient (0.0016 feet per foot for the
vertical gradient compared to 0.0022 to 0.0032 feet per foot for the horizontal gradient). In addition, it is
commonly assumed that the horizontal hydraulic conductivity is an order of magnitude higher than the
vertical hydraulic conductivity due to layering of sediments and possible lenses of lower permeability
material. As a result, under non-pumping conditions, it would take approximately 1,000 feet of horizontal
distance for contamination to migrate from the water table to the bottom of the aquifer, which is 100 feet
deeper.  However, contamination has been present in the MW-2D and ARW-D sampling locations. This
is likely the result of regional pumping, and more specifically historic pumping from PSW-8 and
remediation pumping from ARW-D. Although these wells extract water from multiple intervals,
extraction rates from the lower intervals may be higher than extraction rates in the shallower intervals,
which would increase downward ground water flow and downward contaminant transport. Continued
pumping from PSW-8 and other deeper wells will only perpetuate this accelerated downward contaminant
transport.

Given that contaminant concentrations are generally below cleanup levels in the deep aquifer, with the
exception of the ARW-D sampling location and PSW-8 (depending on the PSW-8 interval that provides
the majority of the contamination), it is suggested that extraction from EX-ID and EX-2D be
discontinued.  Discontinuing extraction from EX-4I/D (100 gpm) could also be considered given that the
contaminant concentration in this well has been below cleanup standards for four consecutive semi-
annual sampling events. The site team may be prefer, however, to continue pumping at this well until
contaminant concentrations are undetectable for several consecutive sampling events. Monitoring can
continue at these and other downgradient wells, and pumping can be restarted at select deep wells if
concentrations increase over two consecutive sampling events. Although PSW-8 may have historically
been responsible for pulling contamination downward, the advantages of pumping from PSW-8 until
cleanup standards are met would likely outweigh the disadvantages.
                                          19

-------
Eliminating extraction from EX-ID and EX-2D will decrease the overall system extraction rate by 170
gpm (70 gpm for EX-ID and 100 gpm for EX-2D). These modifications will decrease the system
extraction rate from 615 gpm to 445 gpm (or 715 gpm to 545 gpm if EX-5I/D is restarted). Cleanup
Status Report Number Seven gives the cost of resin as 0.164 cents per gallon of water treated. At 445
gpm, we estimate an annual resin cost of approximately $384,000 per year. This is an annual savings of
approximately $156,000 per year for resin. There would be other minor cost savings associated with
decreased electrical usage.  When pumping from EX-4I/D is discontinued, resin costs should decrease by
another $86,000 per year.

When pumping from both EX-4I/D  and EX-5I/D is discontinued, the total system pumping rate will allow
the plant to operate one resin train at a time. This will result in a reduction of analytical costs, decrease
operator labor, and allow easier scheduling of maintenance and resin change outs.
6.2.2
SUGGESTIONS FOR GROUND WATER MONITORING
The sampling protocol and costs are reasonable given the construction of the monitoring wells and area of
the monitoring network relative to the appropriate sampling teams. However, with the decrease in plume
extent and concentration, sampling at many monitoring wells could be suspended and sampling from
some other locations could be reduced to annual.  Sampling at the MW-1, MW-6, MW-16, OB-1, OB-2
and HPMW-6 locations at all depths  (16 locations total) could be suspended until confirmation sampling
is needed to reach site closure or reduced in frequency to occur along with each Five Year Review. These
wells are redundant with other existing wells. In addition, the following monitoring wells have routinely
had low or undetectable chromium concentrations and appear to  be consistently side gradient of the
plume.
       •   HPMW-9S, MW-4S, MW-5S, MW-7S
       •   MW-4I, MW-5I, MW-7I, MW-171, MW-181
       •   MW-4D, MW-17D,MW-18D

Based on the above suggestions, the revised ground water monitoring program would be as follows
Annual Sampling
12 Locations
HPMW-9S
MW-4S
MW-5S
MW-7S









MW-4I
MW-5I
MW-7I
MW-1 71
MW-1 81








MW-4D
MW-17D
MW-18D










Semi-Annual Sampling*
44 Locations
MW-2S
MW-8S
MW-9S
MW-1 IS
MW-12S
MW-13S
MW-14S
MW-15S
MW-17S
MW-18S
ARW-S


MW-2I
MW-8I
MW-9I
MW-1 11
MW-1 21
MW-1 31
MW-1 41
MW-1 51
ARW-I




MW-2D
MW-3D
MW-5D
MW-7D
MW-8D
MW-9D
MW-1 ID
MW-12D
MW-1 3D
MW-15D
ARW-D


EX-2S
EX-3S
EX-4S
EX-5S
EX- 11
EX-2I
EX-3I
EX-4I/D
EX-5I/D
EX- ID
EX-2D
EX-3D
PWS-8
* Sampling at residential wells would also continue on a semi-annual basis
                                          20

-------
The above sampling program results in one event with 56 sampling locations and another event with 44
sampling locations in addition to the residential well sampling. This compares to the current program that
includes two events, each with over 70 non-residential sampling locations. This RSE team estimates that
these reductions should yield approximately $25,000 in savings. This estimate is based on reducing the
number of "man/crew-days" from 12 to nine for one event and from 12 to seven for the other event and
assuming a man/crew day costs approximately $3,200 for the site contractor, per diem, equipment, and
subcontractor.
6.2.3        REDUCTIONS IN PROJECT MANAGEMENT CONSISTENT WITH STEADY STATE
             SYSTEM OPERATION
The total contractor project management and technical support costs at $142,000 per year for this site are
higher than the typical Fund-lead P&T site, but additional attention is merited given that the system
provides potable water to the city. Labor rates and level of effort were not provided by the site team for
this cost category, but the following table provides the RSE team's estimate for level of effort per quarter
and typical unit rates to accomplish the project management and technical support scope of work that the
site team presented.
Item per Quarter
project management (senior)
project management (support)
on-demand engineering support
quarterly audit with memo
travel costs to site (excluding labor)
meeting
non-routine support budget

Units
hrs
hrs
hrs
hrs
visit
job
hrs

# of Units
12
52
52
50
2
0.5
20

Unit Cost
$150
$75
$150
$150
$500
$4,000
$150

Cost per
Quarter
$1,800
$3,900
$7,800
$7,500
$1,000
$2,000
$3,000
$27,000
       Note: 0.5 meetings per quarter represents an average of two meetings per year.  Cost assumes two staff for
       one full day meeting near office plus a half day of preparation.

Applying this average quarterly cost over the course of the year would yield $108,000, representing a
$34,000 difference between the RSE team's cost estimate and the project team's costs. As technical
issues arise, the site team might be able to more cost-effectively address items by using its vendors (or
even competing vendors) as technical resources. For issues related to some specific system components,
the site team might also identify local resources that could provide support and help reduce the level of
effort by the senior site engineer.  It is noted that these resources would not completely replace the role of
the senior engineer but could help reduce the time commitment and cost of the senior engineer when
addressing some technical issues. In addition, given that system O&M is becoming more routine, an
effective audit of the system by the engineer who designed it, has provided technical support for several
years, and is also responsible for ongoing management could be done for less, especially if less formal
reporting is used.  It may be more appropriate to use less formal memos to document the findings for each
audit and then summarize the audit findings and resolved issues in a report on an annual basis. Therefore,
a cost of approximately $108,000 may be more appropriate for project management technical assistance
at this site.
                                           21

-------
6.3     RECOMMENDATIONS FOR TECHNICAL IMPROVEMENT

6.3.1        CONTINUE RE-USING ON-SITE EQUIPMENT RATHER THAN PURCHASE NEW
            EQUIPMENT

The remedy will likely achieve its goals in a timely manner. As such, new equipment should not be
purchased if a viable substitute is already available at the site. Primary examples include the controls,
valves, and pumps associated with each extraction well. As extraction wells are shut down, these parts
can be used to replace similar parts from other extraction wells when they fail as has been the practice of
the site team.

6.3.2        PREPARE MAP ILLUSTRATING RESULTS OF SOIL EXCAVATIONS

Based on discussions during the site visit, it appears that a comprehensive map of the soil investigations
and excavations have not been prepared.  Such a map would be helpful, especially given the stated
concern of potential for remaining soil contamination to leach to ground water. It may also be helpful if
the activities described in Recommendation 6.4.1 are implemented. Preparation of this map will required
review previous records and analytical results for both chromium and lead.  The RSE team estimates that
the map could be produced for $7,500.


6.4     CONSIDERATIONS FOR GAINING SITE CLOSE OUT

6.4.1        POSSIBLE APPROACH TO EVALUATING AND ADDRESSING REMAINING SOIL
            CONTAMINATION THAT MAY SERVE AS A CONTINUING SOURCE OF GROUND
            WATER CONTAMINATION

The cause of the initial increase and then decrease in the ARW sampling locations is not certain.
Reasonable suggestions are that it 1) represents the redistribution of existing ground water contamination
under a new pumping regime (i.e., the start-up of the P&T system) or 2) represents contaminant mass that
leached from the soil to the ground water and then migrated to the ARW location. If the first case is true,
then concentrations will likely decrease over time, and MCLs will likely be achieved in a timely manner
(e.g., five to 10 years). However, if the second case is true and soil contamination remains in sufficient
magnitude, then contamination will continue to leach from the soil, causing continued ground water
contamination and delaying the achievement of MCLs. Higher than average rainfall overtime or future
construction at the site might mobilize this contamination.

Continued decreases in the ARW sampling locations since April 2005 suggest that residual soil
contamination is not contributing significantly to ground water contamination, and it is noted that 2003,
2004, 2005, and 2006 were either near normal or above normal for precipitation in Kansas according to
the National Climatic Data Center.  These relatively short term data are not conclusive, but given the
trend, the RSE team would suggest revised pumping as per Recommendation 6.2.1 and continued
monitoring of the ARW locations unless or until concentrations in the ARW locations increase again. If
concentrations continue with the current trend, then aquifer restoration will likely be timely. If
concentrations increase, then it suggests that soil is continuing to contribute to ground water
contamination.

It is recognized that at the end of LTRA in 2013 that the State will inherit this site and that the State
would like some assurance that soil will not cause continuing ground water contamination and prolong
the remedy. If the site team agrees that it is worth further investigation and potential remediation of the
                                         22

-------
soil, the RSE team agrees that soil flushing with some of the treated water would be the most appropriate
remedy. However, the RSE team strongly suggests that capture in the immediate area of the soil flushing
be improved, if flushing is implemented. Currently, flushed contamination (if any) would need to migrate
over 1,000 feet downgradient and over 40 feet down to be extracted by EX-1I. This migration would take
approximately 3 years or more and require a higher extraction rate than more localized capture. A cost
effective approach to this  initial investigation of the soil and improving localized capture would be to
install a shallow extraction well in the middle of what is expected to be the most contaminated area.  It
was suggested to the RSE team that this area was beneath the northeast corner of the treatment plant.
During well installation, soil samples could be collected every 5 feet to determine the vertical profile of
chromium and lead soil contamination in this one area, and a ground water sample could be collected
from the new well. The well should be constructed in the shallow zone but should likely include a "sump"
below the  screen to allow the pump to continue operating at relatively low water levels in the well. If
substantial contamination is observed throughout the profile, and the site team is collectively concerned
about future leaching of this contamination, then modeling with software  such as CHEMFLO or
VLEACH could be conducted to help determine if flushing is appropriate.

If the site team determines that flushing is appropriate, capital costs would likely be relatively substantial.
Additional vertical profiling would likely be merited so that the soil flushing remedy would address the
whole extent of the problem rather than one focused area.  The RSE team estimates that five additional
profiling locations might be appropriate in areas of expected high soil  contamination.  Permanent
monitoring wells would be installed in each of these locations to assist with monitoring the flushing. In
addition, injection points would also be installed for the flushing.  The injection points  should be
sufficiently deep to avoid compromising the integrity of the treatment plant foundation, and the plan
should be reviewed by a qualified geotechnical engineer. The estimated extraction rate from the new,
shallow extraction well would be approximately 25 gpm, and the reinjection rate should be about half of
this (e.g., less than 12.5 gpm). The number and spacing of the reinjection wells would depend on the
depth of the contamination to be flushed and characteristics of the subsurface. For the purposes of this
exercise, the RSE team would assume 10 injection points to a depth of 25 feet each. The extracted water
from the new well would  likely need to be piped to the GAC treatment facility before being treated at the
treatment plant.

The RSE team estimates that the initial vertical profiling from one location, well construction (no pump
or controls at the investigation stage),  associated ground water sampling, and soil leaching modeling
would cost approximately $55,000, including work plans and contractor oversight. If the site team
decides to move ahead with additional profiling and soil flushing according to the above scope of work,
the RSE team estimates that additional capital costs would be on the order of $300,000. Operating the
soil flushing remedy for two years may add an additional $100,000 (i.e., $50,000 per year) for increased
resin usage, technical support, monitoring, and reporting. The RSE team  will defer to the site team to
determine if it is appropriate to make this capital investment or to continue operating the P&T system and
monitoring for potential increases at the ARW well.
                                           23

-------
                                     7.0    SUMMARY
The observations and recommendations contained in this report are not intended to imply a deficiency in
the work of either the system designers or operators, but are offered as constructive suggestions in the
best interest of the EPA and the public. These recommendations have the benefit of being formulated
based upon operational data unavailable to the original designers.

Recommendations are provided in all four categories: effectiveness, cost reduction, technical
improvement, and gaining site closure. The effectiveness recommendations include modifying the
capture zone analysis and to resume pumping in extraction wells where concentrations have increased
above cleanup standards.  The recommendations for cost reduction offer potential cost savings of over
$302,000 per year. Recommendations include changes to ground water extraction well pumping rates,
which will decrease resin usage. The recommendations also include suggested changes to the ground
water monitoring program and a reevaluation of project management costs and reporting frequency.  The
recommendations for technical improvement include continuing to reuse parts from on-site rather than
purchasing new parts and preparing a map to summarize the previous soil excavations. The site closure
recommendation provides considerations for soil investigation and soil flushing if the site team
determines that this is appropriate given the eventual transfer of the site from EPA to the State.

Table 7-1 summarizes the costs and cost savings associated with each recommendation.  Capital costs,
the change  in annual costs, and the change in life-cycle costs are presented for each recommendation.
                                           24

-------
                                   Table 7-1. Cost Summary Table

Recommendation

6.1.1 Modify Methods of
Evaluating Capture Zone
6. 1.2 Re-Start Pumping
at Extraction Wells
where Concentrations
Have Increased above
Standards
6.2.1 Evaluate Extraction
Pumping
6.2.2 Suggestions for
Ground Water
Monitoring
6.2.3 Reductions in
Project Management
Costs
6.3.1 Continue Re-Using
On-Site Equipment
Rather than Purchase
New Equipment
6.3.2 Prepared Map
Illustrating Results of
Soil Excavations
6.4 Consideration for
Gaining Site Closure

Reason

Effectiveness


Effectiveness


Cost Reduction

Cost Reduction


Cost Reduction


Technical
Improvement

Technical
Improvement
Gaining Site
Closure

Additional
Capital
Costs ($)

$0


$0


$0

$0


$0


Not
Estimated

$7,500
$55,000
To
$400,000

Estimated
Change in
Annual Costs
($/yr)

$0


$43,000


($156,000)

($25,000)


($34,000)


Not
Estimated

$0
$0

Estimated
Change in
Life-Cycle
Costs
$*

$0


$0


($780,000)

($125,000)


($170,000)


Not
Estimated

$7,500
$55,000
To
$400,000
Estimated
Change in
Life-Cycle
Costs (net
present
value)
$**
$0


$0


($710,000)

($114,000)


($156,000)


Not
Estimated

$7,500
$55,000
To
$400,000
Costs in parentheses imply cost reductions
* assumes 5 years of operation with a discount rate of 0% (i.e., no discounting)
** assumes 5 years of operation with a discount rate of 5% and no discounting in the first year
                                              25

-------
FIGURES

-------
                              APPENDIX
                REPORT COMMENTS AND RESPONSES
•  EPA Region 7 Comments to Draft RSE Report, July 25, 2007
•  KDPH Comments to Draft RSE Report, June 25, 2007
•  RSE Team Response to Comments, August 31, 2007
•  EPA Region 7 Email Response, September 10, 2007

-------
                                 FIGURE 1-2. LOCATION OF BVTERMEDAITE MONITORING WELLS.
CHICAGO  ROCK ISLAND  &
   TREATMENT	-\

   BUILDING      L_!


            MW-151



 MW_16,    MW-171®
                                             0
900
                                                     SCALE IN  FEET
1800
                                                                                          s
                                                                                       MW-181
   LEGEND


®  MONITORING  WELL


A  RESIDENTIAL WELL


©  EXTRACTION  WELL
             (Note: Reproduced from Long Term Response Action Cleanup Status Report Number 7, Black & Veatch, 2006.)

-------
                                    FIGURE 1-3. LOCATION OF DEEP MONITORING WELLS.
CHICAGO  ROCK ISLAND  &
   TREATMENT	-^
   BUILDING
0           900
                                                     SCALE IN  FEET
                                                                      1800
   LEGEND
9  MONITORING  WELL
A  RESIDENTIAL WELL
©  EXTRACTION  WELL
             (Note: Reproduced from Long Term Response Action Cleanup Status Report Number 7, Black & Veatch, 2006.)

-------
                              APPENDIX
                REPORT COMMENTS AND RESPONSES
•  EPA Region 7 Comments to Draft RSE Report, July 25, 2007
•  KDPH Comments to Draft RSE Report, June 25, 2007
•  RSE Team Response to Comments, August 31, 2007
•  EPA Region 7 Email Response, September 10, 2007

-------
                                      •  REGION YilV  •
                                  901 NORTH 5TH STREET
                                        CITY,        66101
                                      rJUL *  5 208?
TO:          Charles Sands, EPA Headquarters, OSWER/OSRTI

THRU:   !    Glenn Curtis. Branch Chief, EPA Region 7, SUPR/IANE/^
                        '•                                    Cx
FROM:       Robert Weber, Remedial Project Manager, EPA Region 7. 8UPR/IANB

SUBJECT:   Draft Remediation System Evaluation,
             Ace Services Superfund Site, Colby. Kansas

      The US. Environmental Protection Agency (EPA), Region 7 received a copy of the
above-referenced document via e-mail on June 15, 2007, from GeoTrans, Inc., EPA
Headquarters contractor, EPA Region 7 appreciates the opportunity to participate in this remedy
optimization study and looks forward to the final document incorporating the comments
provided below. Additionally, a comment provided via e-mail by Glynis Hill of EPA
Headquarters is attached to this memorandum.

        Comments

      For background and clarification, it should be noted that the aquifer being remediated for
dissolved chromium contamination by the Ace Services Groundwater Treatment System under
EPA Long-Term Remedial Action is a sole source aquifer that supplies drinking water to the
region.  Treated ground-water from the Ace Services remediation system is beneficially reused by
the city  of Colby, Kansas public water supply system.  In 2006, the ground water
system satisfied 51 percent of the demand for potable water to the city of Colby.

       For further background and clarification, a nearby leaking petroleum underground
storage tank site, the Hi-Plains Co-Op, impacts the Ace Services site with petroleum compounds
including 1,2-dichloroethane, Groundwater extracted by the Ace Services system is pumped east
to a       Department of Health and Environment (KDHE) Petroleum Storage Tank Release
Trust Fund site. Granular Activated Carbon (GAG) treatment system.. The GAC system,  is a
petroleum-compounds pretreatment system that operates on the water pressure provided  by the
Aee Services system.. Treated water from the GAC system is then pumped west to the Aee
Services system for chromium treatment. The Ace Services  system operators monitor the GAC
system through       log       and by observing electronic critical flow aad pressure  data for
the GAC system. Effects from, the GAC system on the Ace Services system have been      in
          pumping     pressure and additional loading of carbon     in. bag filters.

-------
 1.   Page ii, Executive Summary.  The executive summary should be modified based oil the
    general comments provided above and the section-specific comments provided below,

 2.   Page ?, Process Monitoring. The last sentence of the paragraph should be modified as
    follows "Once a week, the morning samples are split and sent to an independent
    laboratory contracted through an EPA cooperative agreement with the City of Colby,
    Kansas."

 3.   Page 9, Section 4,2.1.  Water levels measured in active pumping wells will be corrected
    for well efficiency to allow use in constructing ground water contours of the site.

 4.   Page 17, Section 6.1.1. Water levels measured in active pumping wells will be corrected
    for well efficiency to allow use in constructing groundwater contours of the site. It is
    agreed that calculated  water flow, evaluation of contaminant trends, and groundwater
    modeling       indicate adequate capture of the plume.  In addition, to well PSW-8 and
    well cluster MW-8. the site team has been, and will continue to monitor and evaluate
    concentrations in all. wells and make system adjustments to optimize remedial action'
    efforts. This has been evident in recent and historical adjustments to the system.

 5.   Page 18, Section 6.1.2. Extraction well EX-5-I/D will be returned to service at 100
    gallons per minute given that the recent sample data, collected  in April 2007, collected at
    the time the RSE field visit was being conducted (April 2007), indicates rebound of
    hexavalent chromium  in Well EX-5-I/D to a concentration above the cleanup goal.

 6,   Page 18. Section 6.2.1.

       a)  Pumping should be discontinued, for the time being, at  wells EX-l-D and EX-2-
          D. However, pumping should continue at well EX-4-I/D to continue plume
          capture from the intermediate zone in the area of the well.  Contaminants are still
          being detected  in the intermediate zone in this area.  Although detected
          concentrations  of hexavalent chromium are below the cleanup goal, it is unlikely
          that the monitoring wells are located in the area that is the most contaminated.

       b)  By including flow from wells EX-4-I/D and EX-5-I/D,  the total influent would be
          545 gallons per minute which exceeds the maximum influent rate for one
          treatment train. Future consideration for operating one  treatment train will be
          given as the total influent rate allows.

7.   Page 19, Section 6.2.2. A more appropriate approach to developing an optimized
    monitoring     will be to use a statistical software program in conjunction with best-
    professional-judgment at the site. The use of Monitoring and Remediation Optimization
    System (MAROS) will be beneficial in evaluating future monitoring locations. Further
    information on the MAROS software can be found at ^ivw^ijJrilkQIg- Results of the
              optimization evaluation are presented in a technical memorandum dated

-------
 8.       20, Section 6.23.

       a)  It is stated that the total contractor project management and support costs for this
           site are higher than the typical fund-lead pump and treat site. It was recognized in
•  :         the draft RSE that this system supplies potable water. How many of the other
           pump-and-treat systems used for comparison offered a potable water supply
           component where almost 100 percent of the treated water was supplied to a
           municipality in the quantities that the Ace Service treatment system provides?
           Were their costs similar in scope based on the type and concentrations of
           contaminants and quantities of water treated? Were these systems located in rural
           areas or highly populated metropolitan areas?

       b)  It is stated that to reduce the project management costs, as technical issues arise,
           vendors should be worked, with more closely and local expertise should be relied
           on instead of a "high-level" design engineer. These specific suggestions present
                concern.  Vendors may not necessarily have the best interest of the site in
           mind when providing suggestions for replacement or repair of components.  Local
           expertise is limited in the rural area of western. Kansas given that very  few pump-
           and-treat systems are operated in the immediate area.  The term "high-level" for
           design engineer may not be an appropriate term.  EPA's contractors perform
           quality work at negotiated prices under the oversight of EPA personnel.

                  In 2005. the system experienced poor resin quality from a vendor which
           allowed a pH shift and resulted in "fizzing water" at the taps of potable water
           recipients. Much effort went into review and diagnosis of the issue.  The vendors
           of the resin did not notify the site team of the change in the resips ^source until
           after the problems occurred and then attempted to place the failure of the resin on.
           the system    operators.  The design engineer diagnosed the problem
           immediately  (poor quality resin)     provided valuable assistance in rectifying the
           problem.  This is one site-specific example where relying solely on vendors for
           technical trouble shooting may not  be in the best interest of a system that provides
           potable water to the public.

                 Region 7 will continue to use the level of project management necessary
           to ensure that the treatment system  is well-operated and managed both efficiently
           and cost-effectively.  However, relying on. vendors    local expertise  does not
                 to be an option at this time.

       c)  The level  of detail in the audit reports is appropriate for the site. At this time, no
                 is  planned in the reporting formats. However, consideration will be
           whether or not to consolidate the LTRA Cleanup status report and audit reports
           into an       document with periodic technical memorandums reporting audit
           and          results.  The audit period was recently changed from quarterly to
           semi-annually. However, if significant LTRA treatment system concerns are
                    in. the next  or subsequent      periods, the frequency of audits and
                       may be increased.

-------
; 9.  Page 20, Section 6,3.1.'- The practice of sal vaging;uhused on-site equ ipmenl when
    maintaining operating              always :feea;implemented - especially concerning
    extraction wells. Where'extraction wells'hav&'been shut down, parts have been used
    from the inactive wells to repair the remaining active wells.

•• 10.      20, Section 6.3.2. A site     showing soil concentrations and excavafiotflocations
    to      in the evaluation of groundwater treatment system performance will 'be-prepared.

 11. Page 21, Section 6.4.1. It is      that "Continued decrease in the ARW sampling
    locations since April 2005 suggest that residual soil contamination is not contributing
    significantly to groundwater contamination, and it is noted that 2003, 2004,2005, and
    2006 were either near normal or above normal for precipitation in Kansas according to
    the National Climatic Data Center. These relatively short term     are not conclusive,
    but given the trend, the RSE would suggest revised pumping as per Recommendation
    6.2.1 and continued monitoring of ARW locations unless or until concentrations in the
    ARW increase again. If concentrations continue with the current trend, then aquifer
    restoration will likely be timely. If concentrations increase, then it suggests    soil in
    continuing to contribute to groundwater contamination."

           Based on EPA Region 7 knowledge of the site and RSE Recommendation 6.3.2
    and 6.4.1, the following approach will be considered. The timing of this approach will
    depend on site-specific    and available funding for any additional activities.

    Phase!

    a) Prepare a map to show existing soil concentrations and excavatioIv|eea.tionB-in
       relation to existing site structures per RSE Recommendation 6.3.2.

    b) Monitor groundwater data to determine  if increasing or decreasing trends are
       occurring - especially in relation to the ARW wells.

    c) Proceed to Phase 2 if it is determined  that additional characterization is required
       based on the soil concentrations          ongoing groundwater data collection.

              -

    a) Collect additional soil     to determine the remaining nature and extent of soil
       contamination, if any. Vertical profiling (samples every five feet) from  one location
       with installation of a single well (no pump or controls at the investigation stage),
       associated groundwater sampling, and soil leaching modeling will be conducted,

    b) Evaluate the     to determine if a soil source remains     if it will adversely affect
       groundwater in the future.

    c)  If it is determined that a soil source either does not remain or will not adversely affect
       groundwater in the future, no additional  activities will be necessary.  However, if it is
                     a soil source remains and that it will adversely affect groundwater,
       additional investigation    remediation as generally outlined in Phase 3 may be
       considered.

-------
   a) Conduct additional vertical profiling to further define the extent of the soil source
      area.  Approximately 5 soil borings converted to permanent monitoring wells may be
      installed.

   b) Install a treated-water soil-flushing infiltration gallery (approximately 10 injection
      points to an approximate depth of 25 feet below ground surface) with a potential
      design capacity of up to 12.5 gallons per minute,

   c) Modify  the existing treatment system to facilitate treated water injection, a single
      shallow extraction well (approximately 25 gallons per minute), and additional water
      transmission piping leading to the KDHE GAC facility arid associated manual and
      electronic controls,

   d) Operation    maintain the soil flushing    extraction component for approximately
      two years  in conjunction with existing LTRA activities,

12. In summary, the Ace Services LTRA groundwater treatment system, as it currently
   operates without any additional modifications, is protective of human health and the
   environment,  Groundwater hexavalent chromium concentrations are declining.  The
   overall, mass of hexavalent chromium in groundwater from the site continues to  reduce.
   The system has removed over one ton. of chromium from the aquifer and provides
   51 percent of the annual demand for water to the city of Colby public water supply
   system.                    ^v^-:^.:-:W^:;-:-.-.-:^-.;-. •.-.• •

          Of the $302,000 identified in cost savings in the draft RSE, $243,000 is for resin
   annually. The site team continues its ongoing system optimization and prior to the RSE
   reduced pumping to effectively eliminate one resin, change out per year. The remaining
   costs savings in the draft RSE are identified as project management ($34,000 annually).
   and reduced sampling ($25.000 annually).  Project management savings will be  realized
   to the extent possible as the system continues its successful performance.  However,
   utilizing vendors and local support as mentioned earlier, does not appear to be an
   appropriate  option at this time, A technical memorandum is attached that outlines the
          reduced sampling protocol through April 2009.

          In the absence of any additional, site work, the Ace Services LTRA is currently  on
   track to meet the remedial action objectives (RAOs) for the site within an approximate
   10-year time period. In 2013 at the end of the LTRA period and if RAOs are not met, the
        of Kansas will acquire the system for continued operation and maintenance.
   Concerns from KDHE regarding acquisition of the site after the 10-year LTRA period
   have renewed interest in the potential soil source materials remaining onsite.
         Glynis Hill EPA
         Daniel Pope. Dynamae
         Douglas Sutton, GeoTrans
         Ashley Allen,
         Gary Felkner, BVSPC

-------
                                                            Kathleen Setbelius, Governor
                                                           Roderick i. Bremby, Secretary

 DEPARTMENT OF HEALTH
 AND ENVIRONMENT        	:	         www.kdheks.gov
 Division of Environment

                                      June25,2007                 RECEIVED

Mr. Rob Weber                                                   M 2 C W
EPA Region 7                                         .         SUPERFUNO
SUPR/IANE
901 North 5th Street-
Kansas City, Kansas 66101
SUBJECT:   Draft  Remedial System Evaluation, Ace  Services Superfund  Site,  Colby,
             Kansas, dated June 15,2007

Dear Mr, Weber;

The  Kansas Department  of Health and Environment/Bureau of Environmental Remediation
(KDHE/BER) has reviewed the subject document prepared by GeoTrans, Inc.  for the U.S.
Environmental Protection Agency (EPA), received via e-mail on June 15, 2007. Based on our
review of the  document, we have not generated any comments. KDHE/BER looks forward to
working EPA on implementing the recommendations provided in the document.

If you have any questions, please call me at (785) 291-3089.

                                      Sincerely,
                                      Ashley Allen, LGV
                                      Professional Geologist
                                      Superfund Unit/Assessment and Restoration Section
cc:    Fred Molloy -> Leo Henning -» C6 097 00001-1 (Ace Services)
       Bill Heimann, KDHE/NWDO
                      BUREAU OF ENVIRONMENTAL REMEDIATION
     CURTIS STATE OFFICE BUILDING, 1000 SW JACKSON ST., STE. 410, TOPEKA, KS 66612-1367
              Voice 785-291-3089   Fax 785-296-4823   E-Mail: aallen@kdhe.state.ks.us

-------
MEMORANDUM

TO:          Chuck Sands, EPA OSRTI
             Glynnis Hill, EPA OSRTI
             Robert Weber, EPA Region 7

FROM:       Doug Sutton, GeoTrans, Inc. (RSE team coordinator)

SUBJECT:    Response to Comments on the Draft Remediation System Evaluation, Ace
             Services Superfund Site, Colby, Kansas

DATE:       August 31,2007
The Remediation System Evaluation (RSE) team has reviewed comments provided by
the EPA Office of Superfund Remediation and Technology Innovation (OSRTI) and EPA
Region 7. The Kansas Department of Health and Environment (KDHE) forwarded a
letter acknowledging the draft report and generally supporting the report content. KDHE
did not provide any specific comments.

We appreciate the communication provided by the reviewers.  We have provided
responses to each of the comments provided and have revised the RSE report
accordingly.

Comments Provided by EPA OSRTI

1.      Please address the in the RSE report the lead soil contamination that was
       discussed during the RSE site visit.

       Response: Recommendations 6.3.2 and 6.4.1 of the RSE report were intended to
       address both lead and chromium soil  contamination. Given that the site has been
       covered and direct exposure pathways have been eliminated or can be controlled
       by institutional controls at the property, the remaining concern regarding soil
       contamination is the potential for it to act as a continuing source of ground water
       contamination. As indicated by the ground water data, chromium is the
       predominant concern regarding leaching from soil to ground water. Nevertheless,
       Recommendation 6.3.2 has been updated to include mapping of both chromium
       and lead, and Recommendation 6.4.1 has been updated to include sampling of
       both chromium and lead.
Comments Provided by EPA Region 7

EPA Region 7 comments were provided in hard copy format and are included as an
attachment to this response to comments memorandum.  A response to each comment is

-------
provided below.  The number of the response corresponds to the comment number in the
attachment.

Response to General Comment: The information contained in the general comment has
been added to the introduction section and component performance section of the RSE
report and has been summarized in the executive summary of the RSE report.

1.      As requested, the executive summary has been modified to reflect other
       modifications to the report that have been made in response to the other
       comments.

2.      The report has been modified accordingly.

3.      No response required.

4.      No response required.

5.      Restarting EX-5I/D is consistent with Recommendation 6.1.2. It has been general
       practice for the RSE reports to reflect site activities at the time of the RSE site
       visit. Therefore, the RSE report has not been modified.  Restarting of the EX-
       5I/D can be positively reflected in the annual RSE follow-up process to document
       that the RSE Recommendation has been implemented.

6a.     The preference to operate EX-4I/D until concentrations are "non-detect"  for
       several quarters is acknowledged. However, we note that this appears to be a
       different practice than was applied at EX-5I/D, where pumping was discontinued
       despite detectable chromium concentrations. The report has been modified to
       reflect a preference to continue operating EX-4I/D until concentrations are
       undetectable.  However, the RSE team notes that the site team will need to decide
       what standard they are working towards? If pumping at EX-4I/D will continue
       until concentrations are undetectable, does this imply that the site team will
       continue operating the P&T system in general until concentrations are uniformly
       undetectable? If the site team works toward undetectable concentrations, the life
       of the remedy may be extended by several years despite meeting the goals stated
       in the Record of Decision.

6b.     The text has been modified to be consistent with our response to comment 6a.

7.      The MAROS  analysis provided relatively similar results in terms of the number of
       samples collected during semi-annual and annual sampling events. Excluding
       residential well sampling, the RSE report suggests that 44 wells be sampled semi-
       annually,  and an additional 12 wells be sampled annually. Twelve wells are
       selected for less frequent sampling.  Excluding residential well sampling, the
       MAROS analysis suggests 20 wells be sampled semi-annually and an additional
       38 wells be sampled annually.  Fourteen wells were selected for less frequent
       sampling. The RSE recommendation for semi-annual sampling includes the same

-------
       20 wells as the MAROS semi-annual sampling but includes an additional 18 wells
       that the MAROS recommendation suggests for annual or less frequent
       monitoring. There are at least two examples of where the RSE team would choose
       semi-annual sampling where the MAROS analysis suggested annual sampling.
       MAROS suggested MW-18S and MW-15S for annual sampling, and the RSE
       team suggested continuing semi-annual sampling at these two locations.  MW-
       18S is located on the downgradient plume fringe and has concentrations that
       border detectable  and undetectable values.  This well could serve as a valuable
       downgradient performance monitoring well to evaluate capture, especially if the
       site team is considering temporarily discontinuing pumping at some extraction
       wells. MAROS does not have the capacity to determine the value of such
       downgradient performance monitoring wells or the potential changes that may
       occur with changes in pumping rates.  MW-15S is one of the few wells with
       recent concentrations above cleanup standards, and given the expected relatively
       short timeframe for this remedy, the site may prefer more frequent updates (semi-
       annual rather than annual) regarding concentrations in this well to document its
       status with respect to cleanup. The RSE team will  maintain its recommended
       sampling program, which appears more conservative than the MAROS
       recommended sampling program.  The MAROS evaluation and the site team's
       ultimate decision on  a revised monitoring program can be positively noted during
       the annual RSE follow-up process. We note that one well (MW-16D) was
       erroneously included in our table for semi-annual sampling. This has been
       removed, reducing the number of semi-annual samples from 45 (as stated in the
       draft report) to 44 as  stated above.

8a.     To date, none of the other P&T systems that have been reviewed by the RSE team
       provide potable water to municipalities at a magnitude of that at the Ace  Services
       site, but the other P&T systems have varied substantially in terms of contaminants
       treated, volume treated, and location.  In our experience, the factors that generally
       lead to increased project management are complicated treatment  processes that
       involve many vendors and subcontractors to maintain operations, poorly  designed
       systems that require substantial modifications or attention during operation, old
       systems (10+ years old) that require substantial repairs, systems where there are
       frequent meetings to  address community  or political concerns, and systems that
       are being managed alongside several other site activities. The Ace Services site is
       unique. The system is relatively new and appears  well designed such that day to
       day operations are generally  straightforward.  The flow rate treated is relatively
       high, but the treatment train is relatively simple. The community appears very
       supportive of the remedy and the water it provides. There are very few other
       activities at the site other than P&T operation and  routine ground water monitoring.
       All of these factors would generally lead to lower than average project
       management and engineering support costs.  One factor that contributes to
       increased project management costs is the distance of the site from the site
       contractor's office, which increases time and cost for engineering audits and site
       meetings. We included what we believe is a reasonable scope/cost for project
       management and technical support for this site based on what we learned during

-------
       the document review and site visit. Additional services/items that are provided
       but not included in this scope would contribute to higher costs.

8b.     The report text was not intended to suggest that vendors and local expertise
       should be "solely" relied on. Rather, it was intended to suggest that they can be
       valuable resources that can provide use information and analysis as part of the
       product they sell. Involvement by the  site engineer is still needed to request the
       correct analysis and ensure that the interests of EPA and the public are
       represented.  The example provided in the comment is noted.  The RSE report has
       been modified to more clearly  state this intent.  The RSE team encourages the  site
       team to use vendors as valuable sources of information, and supports the Region's
       objection to relying solely on them.

8c.     The comment is noted. The RSE team stands by its suggestion that the report
       format can be simplified, but understands the site team's preference to maintain
       the current format.  The RSE report has not been modified with respect to this
       comment.  The Region's decision on how to address this recommendation can be
       positively noted during the annual RSE follow-up process.

9.      The RSE report has been modified to include "as has been the practice at the site."

10.     No response required.

11.     The process suggested in the comment is consistent with the RSE
       recommendation and no modifications will be made to the report.

12.     Please refer to the above responses.

-------
                                      •  REGION YilV  •
                                  901 NORTH 5TH STREET
                                        CITY,        66101
                                      rJUL *  5 208?
TO:          Charles Sands, EPA Headquarters, OSWER/OSRTI

THRU:   !    Glenn Curtis. Branch Chief, EPA Region 7, SUPR/IANE/^
                        '•                                    Cx
FROM:       Robert Weber, Remedial Project Manager, EPA Region 7. 8UPR/IANB

SUBJECT:   Draft Remediation System Evaluation,
             Ace Services Superfund Site, Colby. Kansas

      The US. Environmental Protection Agency (EPA), Region 7 received a copy of the
above-referenced document via e-mail on June 15, 2007, from GeoTrans, Inc., EPA
Headquarters contractor, EPA Region 7 appreciates the opportunity to participate in this remedy
optimization study and looks forward to the final document incorporating the comments
provided below. Additionally, a comment provided via e-mail by Glynis Hill of EPA
Headquarters is attached to this memorandum.

        Comments

      For background and clarification, it should be noted that the aquifer being remediated for
dissolved chromium contamination by the Ace Services Groundwater Treatment System under
EPA Long-Term Remedial Action is a sole source aquifer that supplies drinking water to the
region.  Treated ground-water from the Ace Services remediation system is beneficially reused by
the city  of Colby, Kansas public water supply system.  In 2006, the ground water
system satisfied 51 percent of the demand for potable water to the city of Colby.

       For further background and clarification, a nearby leaking petroleum underground
storage tank site, the Hi-Plains Co-Op, impacts the Ace Services site with petroleum compounds
including 1,2-dichloroethane, Groundwater extracted by the Ace Services system is pumped east
to a       Department of Health and Environment (KDHE) Petroleum Storage Tank Release
Trust Fund site. Granular Activated Carbon (GAG) treatment system.. The GAC system,  is a
petroleum-compounds pretreatment system that operates on the water pressure provided  by the
Aee Services system.. Treated water from the GAC system is then pumped west to the Aee
Services system for chromium treatment. The Ace Services  system operators monitor the GAC
system through       log       and by observing electronic critical flow aad pressure  data for
the GAC system. Effects from, the GAC system on the Ace Services system have been      in
          pumping     pressure and additional loading of carbon     in. bag filters.

-------
 1.   Page ii, Executive Summary.  The executive summary should be modified based oil the
    general comments provided above and the section-specific comments provided below,

 2.   Page ?, Process Monitoring. The last sentence of the paragraph should be modified as
    follows "Once a week, the morning samples are split and sent to an independent
    laboratory contracted through an EPA cooperative agreement with the City of Colby,
    Kansas."

 3.   Page 9, Section 4,2.1.  Water levels measured in active pumping wells will be corrected
    for well efficiency to allow use in constructing ground water contours of the site.

 4.   Page 17, Section 6.1.1. Water levels measured in active pumping wells will be corrected
    for well efficiency to allow use in constructing groundwater contours of the site. It is
    agreed that calculated  water flow, evaluation of contaminant trends, and groundwater
    modeling       indicate adequate capture of the plume.  In addition, to well PSW-8 and
    well cluster MW-8. the site team has been, and will continue to monitor and evaluate
    concentrations in all. wells and make system adjustments to optimize remedial action'
    efforts. This has been evident in recent and historical adjustments to the system.

 5.   Page 18, Section 6.1.2. Extraction well EX-5-I/D will be returned to service at 100
    gallons per minute given that the recent sample data, collected  in April 2007, collected at
    the time the RSE field visit was being conducted (April 2007), indicates rebound of
    hexavalent chromium  in Well EX-5-I/D to a concentration above the cleanup goal.

 6,   Page 18. Section 6.2.1.

       a)  Pumping should be discontinued, for the time being, at  wells EX-l-D and EX-2-
          D. However, pumping should continue at well EX-4-I/D to continue plume
          capture from the intermediate zone in the area of the well.  Contaminants are still
          being detected  in the intermediate zone in this area.  Although detected
          concentrations  of hexavalent chromium are below the cleanup goal, it is unlikely
          that the monitoring wells are located in the area that is the most contaminated.

       b)  By including flow from wells EX-4-I/D and EX-5-I/D,  the total influent would be
          545 gallons per minute which exceeds the maximum influent rate for one
          treatment train. Future consideration for operating one  treatment train will be
          given as the total influent rate allows.

7.   Page 19, Section 6.2.2. A more appropriate approach to developing an optimized
    monitoring     will be to use a statistical software program in conjunction with best-
    professional-judgment at the site. The use of Monitoring and Remediation Optimization
    System (MAROS) will be beneficial in evaluating future monitoring locations. Further
    information on the MAROS software can be found at ^ivw^ijJrilkQIg- Results of the
              optimization evaluation are presented in a technical memorandum dated

-------
 8.       20, Section 6.23.

       a)  It is stated that the total contractor project management and support costs for this
           site are higher than the typical fund-lead pump and treat site. It was recognized in
•  :         the draft RSE that this system supplies potable water. How many of the other
           pump-and-treat systems used for comparison offered a potable water supply
           component where almost 100 percent of the treated water was supplied to a
           municipality in the quantities that the Ace Service treatment system provides?
           Were their costs similar in scope based on the type and concentrations of
           contaminants and quantities of water treated? Were these systems located in rural
           areas or highly populated metropolitan areas?

       b)  It is stated that to reduce the project management costs, as technical issues arise,
           vendors should be worked, with more closely and local expertise should be relied
           on instead of a "high-level" design engineer. These specific suggestions present
                concern.  Vendors may not necessarily have the best interest of the site in
           mind when providing suggestions for replacement or repair of components.  Local
           expertise is limited in the rural area of western. Kansas given that very  few pump-
           and-treat systems are operated in the immediate area.  The term "high-level" for
           design engineer may not be an appropriate term.  EPA's contractors perform
           quality work at negotiated prices under the oversight of EPA personnel.

                  In 2005. the system experienced poor resin quality from a vendor which
           allowed a pH shift and resulted in "fizzing water" at the taps of potable water
           recipients. Much effort went into review and diagnosis of the issue.  The vendors
           of the resin did not notify the site team of the change in the resips ^source until
           after the problems occurred and then attempted to place the failure of the resin on.
           the system    operators.  The design engineer diagnosed the problem
           immediately  (poor quality resin)     provided valuable assistance in rectifying the
           problem.  This is one site-specific example where relying solely on vendors for
           technical trouble shooting may not  be in the best interest of a system that provides
           potable water to the public.

                 Region 7 will continue to use the level of project management necessary
           to ensure that the treatment system  is well-operated and managed both efficiently
           and cost-effectively.  However, relying on. vendors    local expertise  does not
                 to be an option at this time.

       c)  The level  of detail in the audit reports is appropriate for the site. At this time, no
                 is  planned in the reporting formats. However, consideration will be
           whether or not to consolidate the LTRA Cleanup status report and audit reports
           into an       document with periodic technical memorandums reporting audit
           and          results.  The audit period was recently changed from quarterly to
           semi-annually. However, if significant LTRA treatment system concerns are
                    in. the next  or subsequent      periods, the frequency of audits and
                       may be increased.

-------
; 9.  Page 20, Section 6,3.1.'- The practice of sal vaging;uhused on-site equ ipmenl when
    maintaining operating              always :feea;implemented - especially concerning
    extraction wells. Where'extraction wells'hav&'been shut down, parts have been used
    from the inactive wells to repair the remaining active wells.

•• 10.      20, Section 6.3.2. A site     showing soil concentrations and excavafiotflocations
    to      in the evaluation of groundwater treatment system performance will 'be-prepared.

 11. Page 21, Section 6.4.1. It is      that "Continued decrease in the ARW sampling
    locations since April 2005 suggest that residual soil contamination is not contributing
    significantly to groundwater contamination, and it is noted that 2003, 2004,2005, and
    2006 were either near normal or above normal for precipitation in Kansas according to
    the National Climatic Data Center. These relatively short term     are not conclusive,
    but given the trend, the RSE would suggest revised pumping as per Recommendation
    6.2.1 and continued monitoring of ARW locations unless or until concentrations in the
    ARW increase again. If concentrations continue with the current trend, then aquifer
    restoration will likely be timely. If concentrations increase, then it suggests    soil in
    continuing to contribute to groundwater contamination."

           Based on EPA Region 7 knowledge of the site and RSE Recommendation 6.3.2
    and 6.4.1, the following approach will be considered. The timing of this approach will
    depend on site-specific    and available funding for any additional activities.

    Phase!

    a) Prepare a map to show existing soil concentrations and excavatioIv|eea.tionB-in
       relation to existing site structures per RSE Recommendation 6.3.2.

    b) Monitor groundwater data to determine  if increasing or decreasing trends are
       occurring - especially in relation to the ARW wells.

    c) Proceed to Phase 2 if it is determined  that additional characterization is required
       based on the soil concentrations          ongoing groundwater data collection.

              -

    a) Collect additional soil     to determine the remaining nature and extent of soil
       contamination, if any. Vertical profiling (samples every five feet) from  one location
       with installation of a single well (no pump or controls at the investigation stage),
       associated groundwater sampling, and soil leaching modeling will be conducted,

    b) Evaluate the     to determine if a soil source remains     if it will adversely affect
       groundwater in the future.

    c)  If it is determined that a soil source either does not remain or will not adversely affect
       groundwater in the future, no additional  activities will be necessary.  However, if it is
                     a soil source remains and that it will adversely affect groundwater,
       additional investigation    remediation as generally outlined in Phase 3 may be
       considered.

-------
   a) Conduct additional vertical profiling to further define the extent of the soil source
      area.  Approximately 5 soil borings converted to permanent monitoring wells may be
      installed.

   b) Install a treated-water soil-flushing infiltration gallery (approximately 10 injection
      points to an approximate depth of 25 feet below ground surface) with a potential
      design capacity of up to 12.5 gallons per minute,

   c) Modify  the existing treatment system to facilitate treated water injection, a single
      shallow extraction well (approximately 25 gallons per minute), and additional water
      transmission piping leading to the KDHE GAC facility arid associated manual and
      electronic controls,

   d) Operation    maintain the soil flushing    extraction component for approximately
      two years  in conjunction with existing LTRA activities,

12. In summary, the Ace Services LTRA groundwater treatment system, as it currently
   operates without any additional modifications, is protective of human health and the
   environment,  Groundwater hexavalent chromium concentrations are declining.  The
   overall, mass of hexavalent chromium in groundwater from the site continues to  reduce.
   The system has removed over one ton. of chromium from the aquifer and provides
   51 percent of the annual demand for water to the city of Colby public water supply
   system.                    ^v^-:^.:-:W^:;-:-.-.-:^-.;-. •.-.• •

          Of the $302,000 identified in cost savings in the draft RSE, $243,000 is for resin
   annually. The site team continues its ongoing system optimization and prior to the RSE
   reduced pumping to effectively eliminate one resin, change out per year. The remaining
   costs savings in the draft RSE are identified as project management ($34,000 annually).
   and reduced sampling ($25.000 annually).  Project management savings will be  realized
   to the extent possible as the system continues its successful performance.  However,
   utilizing vendors and local support as mentioned earlier, does not appear to be an
   appropriate  option at this time, A technical memorandum is attached that outlines the
          reduced sampling protocol through April 2009.

          In the absence of any additional, site work, the Ace Services LTRA is currently  on
   track to meet the remedial action objectives (RAOs) for the site within an approximate
   10-year time period. In 2013 at the end of the LTRA period and if RAOs are not met, the
        of Kansas will acquire the system for continued operation and maintenance.
   Concerns from KDHE regarding acquisition of the site after the 10-year LTRA period
   have renewed interest in the potential soil source materials remaining onsite.
         Glynis Hill EPA
         Daniel Pope. Dynamae
         Douglas Sutton, GeoTrans
         Ashley Allen,
         Gary Felkner, BVSPC

-------
Print View                                                                                    Page 1 of 2


  From:     "Pope, Dan" 
  To:       Doug Sutton
  Date:      Monday - September 10, 2007
  Subject:   FW: Revised Ace Services RSE and Response To Comments


  FYI	
  From: Weber.Robert@epamail.epa.gov [mailto:Weber.Robert@epamail.epa.gov]

  Sent: Monday, September 10, 2007 12:13 PM
  To: Pope, Dan
  Cc: sands.charles@epa.gov; Hovis.Jennifer@epamail.epa.gov;
  Hill.Glynis@epamail.epa.gov; aallen@kdhe.state.ks.us
  Subject: Re: Revised Ace Services RSE and Response To Comments
  Dan,

  Regarding comment nos. 6A and 6B, I'm not sure how the interpretation
  was drawn of a preference by the site team for a "non-detect" cleanup
  goal from the original comment provided by EPA Region 7 (comment no.
  6A).   We do not have a preference for a "non-detect" cleanup goal.
  The original comment provided by EPA Region 7 discusses continued
  pumping of well EX-4-I/D to continue capture of the chromium plume in
  support of attaining the cleanup goal of 100 ug/L chromium. The nearest
  monitoring well to well EX-4-I/D (MW-15-S) was only recently found at
  concentrations below the cleanup goal of 100  ug/L chromium during the
  last sample round (April 2007). We would prefer to see a consistent
  downward trend in chromium in the area before relaxing hydraulic control
  in that area.

  Regarding comment no. 7, the RSE team makes valid points for including
  wells MW-18-S and MW-15-S to the list for semi-annual sampling. We agree
  that these two wells should be added to the semi-annual sampling list.
  We believe the remaining schedule developed using the MAROS  software is
  valid and requires no other revision at this time.

  Thanks,
  Rob Weber

  Rob Weber, PG
  Remedial Project Manager