EPA/ROD/R05-00/088
                                    2000
EPA Superfund
     Record of Decision:
     MIG/DEWANE LANDFILL
     EPA ID: ILD980497788
     OU01
     BELVIDERE, IL
     03/31/2000

-------
                   UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                                         REGION 5
                               77 WEST JACKSON BOULEVARD
                                   CHICAGO, IL 60604-3590
                                          MAR  31,  2000
                                                                         REPLY TO THE ATTENTION OF

                                                                                    SR-6J

Thomas V. Skinner, Director
Illinois Environmental Protection Agency
1021 North Grand Avenue East
P.O. Box 19276
Springfield, IL 62794-9276

       Re:  MIG/DeWane Landfill Superfund Site - Belvidere, Illinois
            Region V Concurrence on Record of Decision

Dear Mr. Skinner:

The U. S. Environmental  Protection Agency (U. S. EPA) has reviewed the Record of Decision (ROD)
prepared by the Illinois Environmental Protection Agency (IEPA) for the subject site. Region V hereby
concurs with the IEPA that the selection of Alternative 4A,  a multi-layer cap, with active and passive
management  of landfill gas, the installation of a localized leachate collection system, the removal of
leachate and sediments from the leachate surface impoundment, institutional controls, and the monitored
natural attenuation of groundwater, is the most appropriate remedy for the MIG/DeWane Landfill
Superfund Site in Belvidere, Illinois.

U S. EPA appreciates the efforts of Rick Lanham of your staff in preparing this ROD. Please feel free to
contact me if you have any questions.


 Sincerely,
 William E. Muno, Director
 Superfund Division

-------
bcc:    Richard Clarizio, ORC

-------
                                 Administrative Record Index
                                           for the
                               MIG/DeWane Landfill NPL Site
                                         Update #1

The Comprehensive Environmental Response, Compensation, and Liability Act of 1980 ("CERCLA"), as
amended by the Superfund Amendments and Reauthorization Act of 1986 ("SARA"), requires the
establishment of an Administrative Record upon which the Agency shall base the selection of a response
action (SARA; Section 113(k)(l)).

The Illinois Environmental Protection Agency ("IEPA") has compiled the following official Administrative
Record Index for the MIG/DeWane NPL Site located in Boone County, Illinois. This index as well as the
Administrative Record itself will be updated when necessary by the IEPA.

Please contact Mark Britton (P.O. Box 19276; 1021 North Grand Avenue East; Springfield, Illinois
62794-9276;  217/524-7342) for more information or who and where to direct questions concerning this
Index.
 NO.   DOCUMENT TITLE

 1.      IEPA Rockford Regional Office Field
        Operations Section Inspection
        photographs of MIG/DeWane Landfill

 2.      IEPA Rockford Regional Office
        Inspection Report

 3.      Letter Re:  Potentially Responsible
        Parties and Sampling Results
 4.      Section 122(e) Letters (SARA)

 5.      Field Sample Laboratory Results
 6.      Monthly Progress Report for Field Work
        for the month of December 1990

 7.      Administrative Order on Consent
        ("AOC") for the RI/FS

 8.      Letter to the U.S. EPA: lEPA's review
        comments of the 2nd Revised Workplan
        for Monitoring and Pumping of the
        Surface Impoundment (dated April
        1991)
ISSUE
DATE           AUTHOR
6/27/89     K. Keller, IEPA
1/23/90     K. Keller, IEPA


7/13/90     V. Simmon, U.S. EPA

12/17/90    J. Kelley

12/21/90    J. Barnette
1/07/91     P. Michael Ferrigan
           Gold Associates

4/04/91     U.S. EPA


5/05/91     R. Lanham, IEPA
NO. OF
PAGES
   39


    3

   10

    5


   90


   87

-------
Page 2
 NO.  DOCUMENT TITLE

 9.     Final Scoping Technical Memorandum


 10.    Technical Memorandum on Interim
       Response Measures

 11.    On-Sceen Coordinator's Report for
       the Removal Action

 12.    L.A.E., Inc. Access Agreement
 13.    Letter Re:  IEPA Review Comments
       of the Revised Final Scoping Technical
       Memorandum

 14.    IEPA Review Comments for the
       Revised Technical Memorandum on
       Interim Response Measures

 15.    lEPA's Review Comments on Draft
       RI/FS Work Plan

 16.    List of MIG/DeWane Landfill
       Task Force (MLTF)

 17.    Letter of Audrey L. DeWane
       Re: Property Access

 18.    Letter to Benjamin Farina
       Re: Property Access

 19.    Letter to Steve Lemon Access Issues

 20.    Letter to Steven Lemon with
       Administrative Order

 21.    Letter to R. Williams (Colder Associates)
       Re: IEPA/U.S. EPA Review Comments
       on the Revised RI/FS Work Plan
ISSUE
DATE    AUTHOR
NO. OF
PAGES
8/09/91    R. Petterson,               234
          Colder Associates

10/14/91   R. Williams,                155
          Colder Associates

9/26/91    B. Benning and             14
          V. Simmon, U.S. EPA

11/11/91   W. Buettner,                6
          Colder Associates

11/13/91   R. Lanham, IEPA            7
11/27/91   R. Lanham, IEPA           3



3/31/92    R. Lanham, IEPA          22


6/22/92    D. Vallance, BFI            2


7/24/92    W. Harris, J. Traub          2
          U.S. EPA

7/24/92    W. Harris, J. Traub          2
          U.S. EPA

8/4/92     F. Andes, MLTF           95

9/8/92     T. Jacob, U.S. EPA         11


9/16/92    R. Lanham, IEPA          19

-------
Page 3
 NO.  DOCUMENT TITLE

 22.   Letter to R. Williams (Colder Associates)
       Re:  IEPA Review Comments on 2nd
       Revised Draft RI/FS Work Plan

 23.   Letter to Derrick Vallace (BFI)
       Re:  Review Comments on 2nd
       Revised Draft RI/FS Work Plan

 24.   U.S. EPA Memorandum
       Re:  RI/FS Work Plan Approval

 25.   Letter to IEPA Re:  Qualifications for
       the PRP's New Contractor

 26.   Final Construction Report
       Re:  Construction Activities,
       Interim Remedial Measures,
       Vol. I and Vol II

 27.   U.S. EPA Memorandum
       Re:  Approval of the RI/FS Work Plan

 28.   Letter to C. Hesse (MLTF)
       Re:  Approval of the RI/FS Work Plan

 29.   Letter to C. Hesse (MLTF)
       Re:  Replacement of Colder Associates
       With Mittelhauser Corp.

 30.   Letter Re: Data Validation Forms,
       Field Equipment, Substitutions, and
       Geotechnical Laboratory

 31.   Letter Re: Planned RI/FS Field
       Activities

 32.   Mittelhauser's Modification to the
       RI/FS Project Plans
ISSUE
DATE
AUTHOR
NO. OF
PAGES
11/10/92    R. Lanham, IEPA



11/12/92    W. Hartwick, U.S. EPA



11/24/92    W. Hartwick, U.S. EPA


1/28/93     C. Hesse, MLTF


3/9/93      R. Williams,
           Colder Associates



3/11/93     W. Hartwick, U.S. EPA


3/11/93     R. Lanham, IEPA


3/1193     R. Lanham, IEPA
3/22/93     G Perkowitz,
           D. Heidlauf,
           Mittelhauser

4/5/93      D. Heidlauf
           Mittelhauser

4/8/93      D. Heidlauf,
           Mittelhauser
                            575
                            314
                             78
                            27

-------
Page 4
 NO.   DOCUMENT TITLE

 33.    Letter to Mittelhauser Re: QAPP
        Modifications and Proposed PJ/FS
        Field Activities and Work Plan Changes

 34.    Notification Letter Re:  Pumping
        Leachate from the Surface
        Impoundment

 35.    Work Plans for the RI/FS, Vols. I-VI

 36.    Letter Re:  Adding Respondents to the
        Consents Order

 37.    Letter Re:  Ground Penetrating Radar
        Survey

 38.    Letter Re:  Recent Submittals to IEPA

 39.    Letter Re:  Unresolved RI/FS Field
        Activities Issues

 40.    Letter Response to IEPA
        Re:  RI/FS  Field Activities

 41.    Letter and Document Re: Existing
        Monitoring Well Integrity Survey
        Technical Memorandum

 42.    Letter Re:  Response to Mittelhauser's
        June 14, 1993 Letter

 43.    Letter Re:  Review Comments on
        Existing Monitoring Well Integrity
        Survey Technical Memorandum

 44.    Letter Re:  PACE Laboratory's
        Organic Analysis of Residential
        Well Samples (Attachments)
ISSUE
DATE

4/12/93
4/2193
AUTHOR

R. Lanham, IEPA
W. Gierke,
Colder Associates
NO. OF
PAGES
4/93
5/7/93
5/17/93
6/1/93
6/8/93
6/14/93
6/18/93
6/30/93
7/13/93
Mittelhauser Corp.
W. Muno, U.S. EPA
M. Gade, IEPA
M. Nienkerk,
Mittelhauser
R. Lanham, IEPA
R. Lanham, IEPA
D. Heidlauf,
Mittelhauser
M. Susie,
Mittelhauser
R. Lanham, IEPA
R. Lanham, IEPA
1361
3
3
4
7
21
68
5
2
7/16/93     D. Heidlauf,
                            21

-------
Page 5
                                               ISSUE
 NO.   DOCUMENT TITLE                  DATE

 45.    Letter Re: Force Majeure                7/22/93
        (weather delays)

 46.    Letter Re:  de Minimis Settlement         8/5/93
        with City of Belvedere

 47.    Letter Re: Leachate Surface             8/13/93
        Impoundment and Waste Manifests

 48.    Letter Re: Recent Submittals to IEPA     8/20/93

 49.    Letter Re: Response to IEPA's          9/13/93
        August 20, 1993 Letter

 50.    Data Validation Report for 6 Field         9/14/93
        Samples and Attached Letter dated
        July 8, 1993

 51.    Data Validation Report                   9/23/93
        for 8 Soil Samples and 2 Water
        Samples and Letter

 52.    Data Validation Report                   9/23/93
        for 4 Soil Samples and 2 Water
        Samples and Letter

 53.    Data Validation Report                   9/23/93
        for 6 Soil Samples and 3 Water
        Samples

 54.    Letter and Leachate Surface             9/14/93
        Impoundment Monthly Progress
        Report for August 1993 and Attachment
        from Rock River Reclamation District

 55.    IEPA (Laboratory) Analysis for 2         9/16/93
        Samples

 56.    Data Validation Report for 9              10/4/93
        Soil Samples
AUTHOR

D. Heidlauf,
Mittelhauser

T. Jacobs, U.S. EPA
D. Heidlauf,
Mittelhauser

R. Lanham, IEPA

M. Nienkerk,
Mittelhauser

Heartland Environ.
Service, Inc.
Heartland Environ.
Services, Inc.
Heartland Environ.
Services, Inc.


Heartland Environ.
Services, Inc.
M. Nienkerk,
Mittelhauser
D. Smith, IEA
Heartland Environ.
Services, Inc.
NO. OF
PAGES
   38


    4

    3


   195



   288



   280



   342
   41
   24

-------
Page 6
 NO.   DOCUMENT TITLE

 57.    IEA Analysis on 2 Samples

 58.    Letter Re: Proposed Residential
        Development

 59.    Letter Re: Permit Renewal for
        Leachate from MIG's Surface
         Impoundment and Attached Round
         1 Analytical Results

 60.    RI/FS Progress Report for December
        1993 with Attachments: Analytical
        Data Summary Tables, Round 1 RI/FS
        Samples

 61.    Waste Generation and Volumetric
        Ranking Table

 62.    Letter Response to Gordon Nelson
        Re: Proposed Residential Developement

 63.    Cover Letter and  Attached Soil Borings/
        Monitoring Well Logs; Monitoring Well
        Installation Logs;  and Well Development
        Logs for Summer 1993

 64.    Letter Re: Round 1 RI/FS
        Sample Results of 1993 and Reducing
        Technical Parameters for Rounds 2 and
        3

 65.    Letter Re: Review Comments on
        Mittelhauser's Reduced Parameter List
        Technical Memorandum

 66.    Letter Re: lEPA's Response Letter
        to Proposed Reduced Parameters

 67.    Letter Re: U.S. EPA's Proposed
        de Minimis Settlement
ISSUE
DATE

12/01/93

12/22/93


12/28/93
1/17/94
1/18/94
1/28/94
2/4/94
3/03/94
6/10/94



6/14/94


7/8/94
AUTHOR

L. Mitchell, IEA

R. Peterson


M. Nienkerk,
Mittelhauser
M. Nienkerk,
Mittelhauser
T. Jacobs, U.S.
EPA

R. Lanham, IEPA
M. Nienkerk,
Mittelhauser
M. Nienkerk,
Mittelhauser
R. Lanham, IEPA
M. Nienkerk,
Mittelhauser

T. Jacob, U.S. EPA
NO. OF
PAGES

   26

    1


   36
   229
   179
   206
    19

-------
Page?
 NO.   DOCUMENT TITLE

 68.    Letter Re: Delay to Completion of
        Round 2 RI/FS Sampling

 69.    Leachate Surface Impoundment
        June 1994 Monthly Progress Report
        with Attachment Re: Reinforcing East
        Berm Leachate Surface Impoundment

 70.    Letter Re: Response to Round 2
        Pertinent Comments

 71.    IEPA Referral to Illinois Attorney
        General's Office

 72.    United States Geological Survey
        Letter Re: Response to Round 2
        Pertinent Comments

 73.    General Notice of Potential Liability
        Offer to deMinimis Settlement MIG/
        DeWane Landfill Letter and Attached
        Administrative Order on Consent

 74.    Letter Re: Response to MLTF Letter
        to do Baseline Risk Assessment

 75.    USGS Letter Re: Hydrogeologic and
        Water Quality Data Round 1 RI/FS
        Sampling

 76.    Letter Re: Enforcement Referral of
        October 29, 1990

 77.    Letter Re: Round 2 RI/FS Sampling,
        Response to Mittelhauser's July 15, 1994
        document.

 78.    Letter Re: Review Comments on
        Round 2 Sampling July  15, 1994
        Letter and Document
ISSUE
DATE

7/13/94
7/14/94
7/15/94
7/18/94
7/22/94
7/28/94
8/08/94


9/09/94



9/14/94


9/26/94



9/30/94
AUTHOR

M. Nienkerk,
Mittelhauser

M. Nienkerk,
Mittelhauser
M. Nienkerk,
Mittelhauser

P. Jagiello, IEPA


P. Mills, USGS



J. Traub, U.S. EPA
NO. OF
PAGES
    11
   263
    19
   41
R. Lanham, IEPA
P. Mills, USGS             21
M. Dunn, IAGO
M. Tierney, U.S. EPA      6
R. Lanham, IEPA
    16

-------
PageS
 NO.

 79.
 80.
 81.
 82.
 83.
 84.
 85.
 86.
 87.
DOCUMENT TITLE

Letter Re: Response to U.S. EPA's
Letter Re: Round2RI/FS
Proposed Sampling Locations
on Kishwaukee River
ISSUE
DATE
10/07/94
AUTHOR
M. Nienkerk,
Mittelhauser
NO. OF
PAGES
2
                                      10/11/94
on Proposed Revised Addendum 1
for RI field Sampling Plan

Letter Re:  Revised Conditional           11/14/94
Approval of Addendum 1 to
RI/FS FSP

Letter Re:  Proposed for Hydro           11/23/94
Punch Hydrogeological Field
Investigation Work

Letter Re:  Draft Revised               12/05/94
Addendum 1 FS Plan
U.S. EPA
Settlement and Amendments to
Consent Order
Letter Re: Revised Schedule for
Additional RI/FS Sampling
Letter Re: Round 2 RI/FS
Sampling Revised Schedule
Letter Re: Round 2 RI/FS
Sampling Issues
Letter Re: Significant Task
Completed for Pre-RI/FS and
RI/FS Field Work
Letter and Document Re: Addendum 1
to RI Field Sampling Plan
Letter Re: Response to IEPA
and U.S. EPA Comments Letter

10/14/94
10/14/94
10/21/94
11/02/94
11/4/94
11/11/94

M. Tierney, U.S. EPA
M. Nienkerk,
Mittelhauser
M. Nienkerk,
Mittelhauser
R. Lanham, IEPA
M. Nienkerk,
Mittelhauser
M. Nienkerk,
Mittelhauser
M. Tierney, U.S. EPA
                                                             M. Tierney, U.S. EPA
                                                             M. Nienkerk,
                                                             Mittelhauser
                                                                              11
                                                                              43
                          22

-------
Page 9
 NO.   DOCUMENT TITLE

 90.     Letter and Attachment Re:
        November 1994 Monthly Progress
        Report for RI/FS, Monitoring Well
        Development Summary

 91.     Letter and Document for Revised
        Addendum 1 to FSP for RI/FS

 92.     Monitoring Well Redevelopment
        Tables and Field Forms

 93.     Letter:  RI Round 2 Non-Groundwater
        Analytical Data Summary Tables
        and Hydraulic Probe Soil Boring Logs
        Document: Soil Boring Logs

 94.     Letter, Errata Sheet for RI
        Round 2 Non-Groundwater
        Analytical Data Summary Tables

 95.     Letter Re: RI Round 2 Groundwater
        Analytical Data Summary Tables
        Document: RI Round 2 Groundwater
        Analytical Data Summary Tables

 96.     Letter and Document:  RI Round 2
        Technical Memorandum

 97.     Letter Re: Groundwater Sample
        Results and Upcoming Activities

 98.     Letter Re: U.S. EPA Review
        Comments on RI Round 2 Technical
         Memorandum

 99.     Letter Re: USGS Review Comments
        on (1) RI Round 2 Technical
        Memorandum, (2) Non-Groundwater
        Analytical Data Summary Tables, and
        (3) RI Round 2 Groundwater Analytical
        Summary Tables
ISSUE
DATE

12/16/94
1/11/95


1/17/95


2/15/95
3/13/95
3/15/95
3/17/95


4/4/95


5/3/95



5/8/95
AUTHOR

M. Nienkerk
M. Nienkerk,
Mittelhauser

M. Nienkerk,
Mittelhauser

M. Nienkerk,
Mittelhauser
M. Nienkerk,
Mittelhauser


M. Nienkerk,
Mittelhauser
Mittelhauser
M. Tierney,
U.S. EPA

M. Tierney,
U.S. EPA
P. Mills, USGS
NO. OF
PAGES

    37
   44
   29
   190
   83
   222
   20

-------
Page 10
 NO.   DOCUMENT TITLE

 100.    Letter Re:  RI Round 2 Technical
        Memorandum Review Comments

 101.    Letter Re:  May 19, 1995 meeting
        on the RI Round 2 Technical
        Memorandum Review Comments

 102.    Letter Re:  Location and Installation
        of Additional Groundwater Monitoring
        Wells

 103.    Documents: RI Round 1  and Round 2
        Groundwater Sampling Data Sheets

 104.    Letter Re:  RI Round 2 Technical
        Memorandum and Round 3 Sampling

 105.    Letter Re:  Response to IEPA Letters
        of May 12, 1995 and June 8, 1995
        for Addendum to RI Round 2 Sampling
        Technical Memorandum

 106.    Letter: IEPA Review Comments, Re:
        Mittelhauser Letter of June 14, 1995

 107.    Letter Re:  Addendum to Respondent
        List for RI/FS Administrative Order

 108.    Document Re: Addendum II to Field
        Sampling Plan for the RI/FS

 109.    Fax Letter Re: Summary of Telephone
        Conference (Aug. 24, 1995) Issues
        Pertaining to the Scope of the Baseline
        Risk Assessment

 110.    Memorandum Re: Summary of
        Telephone Conference Call of
        September 6, 1995
ISSUE
DATE

5/12/95
5/22/95
5/23/95
9/7/95
AUTHOR

 R. Lanham, IEPA
 M. Nienkerk,
 Mittelhauser
 P. Mills, USGS
5/25/95
6/08/95
6/14/95
6/20/95
6/22/95
6/23/95
9/1/95
M. Nienkerk,
Mittelhauser
R. Lanham, IEPA
M. Nienkerk,
R. Lanham, IEPA
M. Tierney, U.S.
EPA
M. Nienkerk,
Mittelhauser
W. Dewar, COM
 W. Dewar, COM
NO. OF
PAGES

   25
                                       50
                                       11
                                      109
                                       41

-------
Page 11
 NO.   DOCUMENT TITLE

 111.   Letter Re: 7 New Groundwater
        Monitoring Wells, RI Round 2 Sampling

 112.   Reply to IEPA letter of September 12,
        1995, for 7 New Monitoring Wells
        and RI Round 2 Sampling

 113.   Letter Re: Additional of Respondents
        to RI/FS Administrative Order and
        Attachment List of Potentially
        Responsible Parties

 114.   Letter Re: Wetland Delineation and
        Land Use with Maps and Attachments

 115.   Letter Re: Site Visit for RI Round 3
        Sampling

 116.   Letter Re: Review Comments on Work
        Plan for Baseline Risk Assessment

 117.   Documents Re:  Technical Information
        for Summary 1995 RI Field Activities
        (Soil Boring/Well Logs, Groundwater
        Monitoring Well Installation Logs and
        Monitoring Well Development Logs)

 118.   Letter Re: November 1995 Field
        Sampling

 119.   Document Re: RI Round 3
        Groundwater Analytical Data
        Summary Table

 120.   Document Re: Site Characterization
        Memorandum (Vols. 1-6)

 121.   Document Re: RI Round 4 Analytical
        Data Summary Tables
ISSUE
DATE

9/12/95


9/25/95



9/27/95
9/28/95


9/29/95


10/27/95


10/31/95
10/31/95


12/95



2/20/96


2/96
AUTHOR

R. Lanham, IEPA


M. Nienkerk,
W. Muno, U.S. EPA
M. Gade, IEPA
Clayton, Mittelhauser
M. Nienkerk

P. Mills, USGS
M. Tierney, USGS
Clayton, Mittelhauser
M. Nienkerk
NO. OF
PAGES
M. Nienkerk,
Mittelhauser

Clayton, Mittelhauser
Clayton, Mittelhauser
Clayton
    18
   63
   123
   1153
   71

-------
Page 12
 NO.   DOCUMENT TITLE

 122.   Letter Re: Feasibility Study and
        Risk Assessment

 123.   Letter Re: Site Characterization
        Memorandum, Correction

 124.   Document: Technical Review of the
        Site Characterization Memorandum

 125.   Letter Re: Review Comments on the
        Site Characterization Memorandum

 126.   Letter Re: RI/FS Expedited Schedule

 127.   Letter Re: Draft Review Comments
        on the Site Characterization
        Memorandum

 128.   Letter Re: Revised RI/FS
        Schedule

 129.   Letter Re: Scoping Memorandum for
        the Ecological Risk Assessment

 130.   Letter Re: Revised Expedited RI/FS
        Work Plan Schedule

 131.   Letter Re: Scoping Memorandum
        for the Human Health Assessment

 132.   Letter Re: Response to Revised
        RI/FS Schedule

 133.   Fax Letter Re:  Proposed Meeting
        Agenda for the MIG/DeWane
        Coordinating Committees

 134.   Letter Re: Review Comments on the
        Site Characterization Technical
        Memorandum/Draft RI Report
ISSUE
DATE
3/12/96
3/22/96
3/25/96
3/29/96
4/01/96
4/1/96
4/9/96
4/23/96
4/25/96
4/26/96
5/3/96
5/7/96
AUTHOR
M. Tierney, U.S. EPA
M. Nienkerk, Clayton
V. Becker
P. Mills, USGS
R. Lanham, IEPA
S. Killip, COM
M. Nienkerk
Clayton
S. Killip, CDM
R. Lanham, IEPA
C. Rioux, CDM
M. Nienkerk,
Clayton
M. Britton, IEPA
NO. OF
PAGES
2
2
45
2
4
4
4
3
5
4
3
3
5/8/96
M. Tierney, U.S. EPA
50

-------
Page 13
 NO.   DOCUMENT TITLE

 135.   Letter Re: May 7, 1996 Site Inspection
        for Baseline Risk Assessment

 136.   Letter Re: Revised Scoping Technical
        Memorandum for Human Health Risk
        Assessment

 137.   Letters Re:  Review Comments on the
        Site Characterization Memorandum
        Draft RI Report

 138.   Letter Re: Response to IEPA's
        May 22, 1996 Review Comments Letter
        on the Draft RI Report

 139.   Letter Re: Approach to Selecting
        Chemical of Concern and Exposure
        Point Concentrations for Human
        Health and Ecological Risk Assessment

 140.   Letter Re: Selection of Chemicals of
        Concern for MIG Risk Assessment

 141.   Letter Re: Changes to Screening
        Criteria for Chemical of Concern

 142.   Letter Re: Preliminary Documents
        for the Development of the Baseline
        Risk Assessment

 143.   Letter Re: U.S. EPA Comments on
        Risk Baseline Assessment

 144.   Letter Re: Proposed Changes to the
        Draft RI Report

 145.   Letter Re: Waste Delineation
        Confirmation
ISSUE
DATE

5/9/96


5/13/96



5/22/96



6/17/96



6/26/96
7/3/96


7/15/96


8/9/99



8/16/96


9/10/96


9/11/96
AUTHOR

D. Heidlauf, Clayton


C. Rioux, COM



R. Lanham, IEPA



M. Nienkerk,



C. Rioux, COM
NO. OF
PAGES
C. Rioux, COM


C. Rioux, COM


R. Lanham, IEPA
J. Peterson, U.S.
EPA

M. Nienkerk
Clayton

M. Nienkerk
Clayton
   34
   54
   24

-------
Page 14
 NO.   DOCUMENT TITLE

 146.   Document Re:  Alternative Arrays
        Technical Memorandum

 147.   Letter Re:  Alternative Arrays
        Technical Memorandum Format

 148.   Letter Re:  Alternative Array Format

 149.   Letter Re:  Supplemental Waste
        Delineation Activities

 150.   Document Re:  Revised Draft RI
        Report

 151.   Letter Re:  Supplemental Waste
        Delineation Activities, RI Report
        Addendum

 152.   Document Re:  Comments on Draft
        Human Health and Ecological Risk
        Assessment for MIG/DeWane Landfill

 153.   Letter Re:  Response to Comments
        on the Risk Assessment

 154.   Letter Re:  Response to IEPA's
        December 9, 1996 and December 17,
        1996 Letters

 155.   Letter Re:  Conestoga-Rovers
        and Clayton's Review Comments
        on the Draft Risk Assessment

 156.   Letter Re:  Accelerated Schedule

 157.   Letter Re:  Review Comments on
        The Revised Draft Report
ISSUE
DATE
9/20/96
10/17/96
11/08/96
11/15/96
12/09/96
12/17/96
AUTHOR
M. Nienkerk,
Clayton
M. Nienkerk,
Clayton
R. Lanham, IEPA
M. Nienkerk,
Clayton
R. Lanham, IEPA
R. Lanham, IEPA
NO. OF
PAGES
6
2
12
43
7
4
12/17/96     Conestoga-Rovers          217
            and Clayton
1/17/97      C. Rioux                   10
            COM

1/22/97      M. Nienkerk,               94
            Clayton


2/11/97      C. Rioux, COM             13
            and R. Lanham, IEPA
3/14/97      M. Nienkerk, Clayton        4

3/20/97      R. Lanham, IEPA           11

-------
Page 15
 NO.   DOCUMENT TITLE

 158.   Documents Re: Final Report Human
        Health and Ecological Risk Assessment
        (3 Vols.)

 159.   Letter Re: Revised Language for
        Final RI Report

 160.   Letter Re: Reply to Revised Language
        for Final RI Report Letter

 161.   Letter Re: Review Comments on
        Final RI Report and Draft
        Feasibility Study

 162.   Letter Re: Revised RI Report Language
        and Draft FS Report

 163.   Letter Re: Confirmation of
        Meeting to Discuss the lEPA's
        Letter of June 4, 1997

 164.   Fax Re:  Suggested Changes to Section
        6 (Risk Assessment) of the Draft
        Final RI Report

 165.   Memorandum Re: Summary of
        Reviews Meeting for the Draft
         Feasibility Study

 166.   Letter Re: Revised Draft Final RI

 167.   Document Re:  Final RI Report (5 Vols.)
        Report and Draft FS Report Language

 168.   Letter Re: Focused Feasibility Study
        (FFS) Schedule

 169.   Letter Re: Appendix G to the Proposed
        Changes to the Draft Focused Feasibility
        Study
ISSUE
DATE
4/31/97
AUTHOR
COM
NO. OF
PAGES
958
5/13/97        R Lanham, IEPA
5/17/97        M. Nienkerk,
5/21/97        C. Rioux, COM
6/4/97         R. Lanham, IEPA
6/13/97        M. Nienkerk,
              Clayton
7/01/97        M. Nienkerk,
              Clayton


7/03/97        D. Knox,
              C. Kaslick, COM
7/10/97        R. Lanham, IEPA

7/11/97        Clayton
7/16/97        M. Nienkerk,
              Clayton

8/19/97        M. Nienkerk,
              Clayton
 13
 15
 5

1801
 14

-------
Page 16
 NO.   DOCUMENT TITLE

 170.    Letter and Document Pages Re: Errata
        to the Final PJ Report

 171.    Letter Re: MIG/DeWane Landfill

 172.    Document Re:  Draft Proposed Changes
        to the Redline/Strikeout Changes to
        the Draft FFS

 173.    Letter Re: Revised Draft and FFS
        Document, IEPA Review Comments

 174.    Letter Re: Proposed Changes to
        the Draft FFS

 175.    Letter/Document Re: Remedial Action
        Alternative Selection

 176.    Letter Re: Reply to IEPA Review
        Comments on Proposed Changes
        to the Draft FFS

 177.    Letter Re: Proposed Changes to
        the Draft FFS

 178.    Letter Re: Comments on the
        Remedial Action Alternative and
        Proposed Changes to the Draft FFS.

 179.    Document Re:  IEPA's Draft Proposed
        Plan

 180.    Letter Re: FS Schedule
 181.    Letter Re:  FFS Revision
ISSUE
DATE
9/5/97
9/16/97
10/10/97
10/23/97
11/19/97
12/15/97
12/16/97
1/12/98
1/28/98
3/02/98
3/26/98
5/15/98
AUTHOR
M. Nienkerk,
Clayton
R Boice, U.S. EPA
Clayton
R. Lanham, IEPA
R. Lanham, IEPA
Clayton
M. Nienkerk
Clayton
M. Nienkerk,
Clayton
C. Kaslick, and
S. Bhagat, COM
M. Nienkerk,
Clayton
M. Nienkerk,
Clayton
M. Nienkerk,
Clayton
NO. OF
PAGES
44
4
120
6
5
21
72
2
2
101
2
2

-------
Page 17
 NO.   DOCUMENT TITLE

 182.   Document Re: Draft Final Focused
        Feasibility Study 3 Volumes

 183.   Letter Re: Draft and Final FFS
        Revision

 184.   Letter Re: Finalization of the FFS
 185.   Letter Re: FSS Revisions

 186.   Letter and Document Pages
        Re: Revised Pages for Finalization
        of the FFS

 187.   Letter Re: Notification of Gas Probe
        Installation and Monitoring Activities

 188.   Letter Re: Gas Probe Installation
        Start Date

 189.   Letter Re: Landfill Gas Monitoring
        Probe Analytical Results

 190.   Letter Re: Landfill Gas Meeting,
        Agenda, Analytical Sample Results,
        Diagrams and Photos

 191.   Letter Re: Removal Action Work
        for MIG/DeWane

 192.   Letter Re: Conditional Acceptance
        of the Final Focused Feasibility Study

 193.   Letter Re: Subdivision Gas Probe
        Installation for System Performance
        Verification for Gas Extraction System
ISSUE
DATE     AUTHOR

6/30/98     M. Nienkerk,
           Clayton

11/05/98    R Lanham, IEPA
12/15/98    M. Nienkerk,
           Clayton

1/15/98     R. Lanham, IEPA

2/01/99     M. Nienkerk,
           Clayton
NO. OF
PAGES
3/08/99
3/15/99
4/16/99
4/16/99
M. Nienkerk,
Clayton
M. Nienkerk,
Clayton
M. Nienkerk,
Clayton
Clayton
5/03/99     R. Lanham, IEPA


5/03/99     R. Lanham, IEPA


5/04/99     M. Nienkerk,
           Clayton
    2

    18
                                     20
                                     15

-------
Page 18
 NO.   DOCUMENT TITLE

 194.   Letter Re: Installation of Gas Probes
        in Wycliffe Subdivision and other Issues.

 195.   Letter Re: Installation of Gas and
        Groundwater Monitoring Wells in
        Wycliffe Subdivision

 196.   Letter Re: Concerned Citizens Question
        Relating to Gas Migration and Other
        Issues Associated with the MIG/DeWane
        Landfill

 197.   Fax Re: Gas Extraction System
        Performance Data Results (Maps,
        Tables and Graphs).

 198.   Fax Re: Landfill Gas Interceptor
        Trench Performance Data

 199.   Letter Re: Additional Information
        In Reply to lEPA's 5/3/99 letter

 200.   Letter Re: Response to Comments
        From May 20,  1999 Public Meeting

 201.   Letter Re: Response to Comments
        From May 20,  1999 Public Meeting

 202.   Notice of Public Hearing

 203.   Letter Re: Landfill Gas Extraction
        System

 204.   Letter and Tables Re:  Gas Extraction
        System Status Update

 205.   Proposed Plan Report

 206.   Report Re: Gas Extraction System
        Construction Completion
ISSUE
DATE

5/7/99


5/10/99



5/21/99
AUTHOR

R. Lanham, IEPA


T. Ayers, IEPA



J. Blaesar
NO. OF
PAGES
6/02/99
6/7/99
6/8/99
6/10/99
6/11/99
6/11/99
6/17/99
M. Nienkerk,
Clayton
Monte Nienkerk
Monte Nienkerk
Mark Britton
Clarence Smith
Mark Britton
Monte Nienkerk
6
3
7
7
2
3
2
7/2/99        Monte Nienkerk


7/13/99       Rick Lanham

7/30/99       Monte Nienkerk
                         14


                         45

                         229

-------
Page 19
 NO.   DOCUMENT TITLE

 207.   Letter Re:  Additional Sampling

 208.   Letter Re:  Comments to lEPA's
        Proposed Plan MIG/DeWane

 209.   Letter Re:  Response to IEPA Request
        For Additional Work

 210.   Letter Re:  Gas Extraction System
        Update

 211.   Letter Re:  Additional Information
        On lEPA's Proposed Plan

 212.   Letter Re:  IEPA Request for Additional
        Work, Clayton's Sept. 3, 1999 Response

 213.   Letter Re:  Landfill Gas Emergency
        Response Actions Discontinuance
        Implementation Plan Gas Extraction
        Wells

 214.   Letter Re:  VOC Sampling

 215.   Letter Re:  Landfill Gas Emergency
        Response Actions Discontinuance
        Implementation Gas Extraction Wells

 216.   Community Relations Plan

 217.   Letter Re:  VOC Sampling

 218.   Letter Re:  Landfill Gas Emergency
        Response Actions Discontinuance
        Implementation Plan

 219.   Letter Re:  Shutdown of Gas Extraction
        Well System
ISSUE
DATE
8/13/99
8/25/99
9/3/99
10/12/99
10/25/99
11/9/99
11/9/99
11/30/99
12/3/99
3/93
12/7/99
12/10/99
AUTHOR
Rick Lanham
Clifton Lake
Monte Nienkerk
Monte Nienkerk
Rudy Bonaparte
Rick Lanham
Monte Nienkerk
Rick Lanham
Rick Lanham
Mike Orloff
Monte Nienkerk
Monte Nienkerk
NO. OF
PAGES
5
33
5
14
14
2
21
2
4
18
2
4
1/3/00
Monte Nienkerk
RL\mls\992051S.WPD

-------
       DECLARATION FOR THE RECORD OF DECISION
SITE NAME AND LOCATION

MIG/DeWane Landfill
Belvidere, Illinois

STATEMENT OF BASIS AND PURPOSE

This decision document presents the selected remedial action for the MIG/DeWane Landfill ("the
Site") in Boone County, Illinois. This remedial action was chosen in accordance with the Illinois
Environmental Protection Act, 415 ILCS 5/1 et seq.: the Comprehensive Environmental
Response, Compensation, and Liability Act of 1980 ("CERCLA"), as amended, 42 U.S.C. 9601
et seq. by the Superfund Amendments and Reauthorization Act of 1986 ("SARA"); and the
National Oil and Hazardous Substances Pollution Contingency Plan ("NCP"), 40 C.F.R. Part 300.
This decision document explains the factual and legal basis for selecting the final remedy for this
Site. The decisions contained herein are based on information contained in the Administrative
Record for this Site. The United States Environmental Protection Agency ("U.S. EPA") has
expressed a  willingness to concur with the selected remedy. The letter of concurrence will be
added to the Administrative Record.

ASSESSMENT OF THE SITE

Actual or threatened releases of hazardous substances from the site, if not addressed by
implementing the response action selected in this Record of Decision ("ROD"), may present an
imminent and substantial endangerment to the public health, welfare, or the environment.

DESCRIPTION OF THE REMEDY

The remedial action contained in the ROD will be a final Site-wide remedy. The  selected remedial
action addresses  the major threats posed by the Site. The remedial actions include the containment
of the landfill wastes by the installation of a multi-layer cap, the active and passive management of
landfill gas,  the installation of a localized leachate collection system, the removal of leachate and
sediments from the leachate  surface impoundment, and the monitored natural attenuation of
groundwater. The final remedy builds on previously implemented interim response

-------
actions, and emergency response and removal actions. These actions include: an interim cap,
pumping down of the leachate surface impoundment liquids, and the recent installation of a
landfill gas interceptor trench and gas extraction system in the area adjacent to the west side of
the landfill. The final remedy selected for the Site incorporates both the long-term monitoring and
operation and maintenance of these components, as well as other response actions. The function
of these actions is to properly close the landfill and surface impoundment, to control the migration
of landfill contaminants to the groundwater and other media (especially landfill gas emissions),
and to reduce the risks associated with any possible exposure to contaminated materials. This
remedy is intended to be the final action for the site, and addresses all contaminated media:
contaminated soil, sediment, groundwater, landfill wastes, leachate generation, and the emission
of landfill gases.

Specifically the Illinois Environmental Protection Agency ("Illinois EPA") has determined that the
following measures should be implemented as the long-term remedy in order to fully address all
threats to human health and the environment posed by contamination at the Site:

•      Institutional controls in the form of future land-use and groundwater use restrictions for
       the landfill  Site and areas west and north of the Site;

       Closure of the surface impoundment through the removal of all leachate liquids for off-site
       treatment and disposal;

       Excavation and consolidation of leachate surface impoundment sediments under a new
       multi-layer landfill cap;

•      Construction of a new multi-layer landfill cap to cover and contain landfill wastes,
       minimizing the infiltration of precipitation to reduce leachate generation;

       Monitored natural attenuation of groundwater to attain groundwater  chemical-specific
       ARARs (i.e., Illinois Class I groundwater quality criteria) and long-term groundwater
       monitoring;

•      Leachate monitoring of hydrostatic conditions within the landfill interior and off-site
       landfill gas monitoring to the west of the Site;

       The continued operation, maintenance, monitoring and evaluation of the gas collection
       system. This system is comprised of extraction wells and a gas interceptor trench (installed
       and operating since May 1999), located west of the landfill and designed to meet the
       ARAR standards and be protective of the residential homes located west of the soil
       borrow pit area. This portion of the remedy will be operated in the active mode until  such
       time as it can be demonstrated by offsite monitoring and data evaluation efforts that
       landfill gas migration no longer poses a concern to potential residential exposure points

-------
       or an exceedence of ARAR standards;

       Enhancement of the present gas collection system with passive gas extraction wells to be
       located within the interior of the landfill;

•      Active leachate removal using the existing leachate removal system that underlies the
       eastern portion of the landfill Site and a system of either permeable bed layers or side
       slope drainage trenches, with the potential for contingent leachate removal upgrade
       options, constructed in major seep areas along the northern and western portions of the
       landfill, will occur and be subject to further study, and evaluation of hydrostatic conditions
       during the Pre-Design phase;

       Off-site treatment of collected  leachate by direct discharge to POTW or alternative
       commercial disposal facility (on-site pretreatment may be required to meet applicable
       POTW effluent criteria);

•      Construction of a surface water diversion system along the landfill side slopes, which may
       include drainage ditches around portions of the toe of the landfill, where feasible, and
       corresponding discharge routes (including necessary erosion control measures, structures,
       etc.).

DECLARATION of STATUTORY DETERMINATIONS

The Selected Remedy is protective of human health and the environment, complies with Federal
and State requirements that are applicable or relevant and appropriate to the remedial action
(unless justified by a waiver), is cost effective, and utilizes permanent solutions and alternative
treatment (or resource recovery) technologies to the maximum extent practicable. The remedy
partially satisfies the statutory preference for treatment as a principal element of the remedy.
Treatment is not considered to be practicable for all the  landfill waste due to the large volume and
heterogeneous distribution of waste at  the Site. Leachate, however, will be treated.

Because this remedy will result in hazardous substances, pollutants, or contaminants remaining
on-site above levels that allow for unlimited use and unrestricted exposure, a statutory review will
be conducted within five years after initiation of remedial action to ensure that the remedy is, or
will be, protective of human health and the environment.

It is the considered opinion of the Illinois Environmental Protection Agency (Illinois EPA), in
consultation with USEPA Region V, that the selected remedy is protective of human health and
the environment, attains Federal and State requirements that are applicable or relevant and
appropriate for this remedial action (or invokes an appropriate waiver), is cost-effective, and
utilizes permanent solutions and alternative treatment technologies (or resource recovery) to the
maximum extent practicable and satisfies the statutory preference for remedies that employ

-------
treatment that reduces toxicity, mobility, or volume as a principal element. Because this remedy
will result in hazardous substances remaining on-site above levels that will allow for unlimited use
and unrestricted-exposure, a statutory review will be conducted within five years after initiation of
remedial action to ensure that the remedy is, or will be protective of human health and the
environment.

ROD DATA CERTIFICATION CHECK LIST

The following information is included in the Decision Summary section of this Record of
Decision. Additional information can be found in the Administrative Record for this site.

       Chemicals of concern and their respective concentrations.
•      Baseline risk represented by the chemicals of concern.
       Cleanup levels established for chemicals of concern and the basis for these levels.
       How sources materials constituting principal threats are addressed.
•      Current and reasonably anticipated future land use assumptions and current and potential
       future beneficial uses of groundwater used in the baseline risk assessment and ROD.
       Potential land and groundwater use that will be available at the site as a result of the
       Selected Remedy.
•      Estimated capital, annual operation and maintenance (O&M), and total present worth
       costs, discount rate, and the number of years over which the remedy cost estimates are
       projected.
•      Key factor(s) that led to selecting the remedy (i.e., describe how the Selected Remedy
       provides the best balance of tradeoffs with respect to the balancing and modifying criteria,
       highlighting criteria key to the decision.)
                                                                        16/00
Thomas V. Skinner, Director                                    Date
Illinois Environmental Protection Agency

-------
RECORD OF DECISION





         for





  MIG/DeWane Landfill

-------
I. Site Name, Location and Description
The MIG/DeWane Landfill, also known as Boone Landfill, Bonus Landfill, or Remedy Landfill is
located in Boone County, Illinois approximately 0.25 miles east of the City of Belvidere and 0.5
miles north of Business United States (U.S.) Route 20. The landfill is located primarily in the
south half of the southeastern quarter of Section 30, Township 44 North, Range 4 East. A map is
provided below for reference.

-------
                                           01
175

-------
The MIG/DeWane Landfill Site occupies an area of approximately 47 acres and rises to a height
of approximately 50 to 55 feet above the surrounding terrain. The Site consists of a landfill and a
leachate surface impoundment. The surface impoundment was constructed to receive leachate
from the landfill's gravity flow, leachate collection system. The Site is bounded on the north by
the  Chicago and Northwestern railroad tracks and the Commonwealth Edison right-of-way.
Agricultural and commercial properties are located to the east and south of the landfill. A soil
borrow pit, used to provide soil for the landfill's interim cap, is immediately adjacent to the west
of the landfill. Further west of the landfill is a housing development. North of the railroad tracks is
an agricultural field that extends to the Kishwaukee River.

The Site contains a municipal landfill that received residential, municipal, commercial, and
industrial wastes for disposal. The MIG/DeWane landfill is classified as a Type I landfill. A Type I
landfill is a co-disposal facility where hazardous wastes were disposed of with municipal solid
wastes. At these types of landfills, discrete "hot spots" are neither known nor suspected to be
present. Hot spots consist of highly toxic and/or highly mobile material, and present a potential
principal threat to human health and the environment. There are no known or suspected hot spots
at the MIG/Wane landfill. A type I landfill also has the presence of hazardous constituents in the
groundwater.

A Remedial Investigation and Feasibility Study ("RI/FS") was conducted at the MIG/DeWane
Landfill site ("Site") under an Administrative Order by Consent ("AOC" or Consent Order")
which was signed on May 29, 1991. This  Consent Order was signed by the United States
Environmental Protection Agency ("U.S. EPA"), the Illinois Environmental Protection Agency
("Illinois EPA"), and numerous Potentially Responsible Parties ("PRPs"). The RI/FS was
conducted by the PRPs, with oversight by the Illinois EPA and U.S. EPA, and was completed in
February 1999.  During the RI/FS, the U.S. EPA was the lead agency for the enforcement related
activities associated with the Site and the Illinois EPA was lead agency for overseeing the
technical activities.

It is anticipated that the PRPs will be conducting and funding the remedial actions. They have
already undertaken interim remedial actions prior to the RI. Also, after the completion of the
RI/FS, due to emergency situation resulting from off-site landfill gas migration, they installed an
active landfill gas interceptor trench and gas extraction system. The Illinois EPA provided
oversight of all previous remedial action activities, and will continue to do so for the future Final
remediation activities.

The objectives of the RI and FS were to determine what contamination may be occurring due to
the  landfill wastes, to evaluate alternatives for addressing the threats or potential threats posed by
the  Site's contamination, and to identify, develop, and evaluate cleanup alternatives appropriate
for the Site. The preferred remedial alternative for this Site is alternative 4A, which in general is a
compromise between alternative 4 and 5. The 4A alternative was chosen because it is the best
alternative that meets the CERCLA requirements. It is protective of human health and the
environment, complies with the applicable requirements as well as the relevant and appropriate

-------
requirements (ARARs), and is considered to be the best balance of the 9 evaluation criteria for the
remedial alternatives.
II. Site History and Enforcement Activities	

Site History

The MIG/DeWane (MIG) Landfill operated from 1969 until 1988. The landfill was permitted to
receive residential, municipal, commercial and industrial wastes. With the enactment of the
Resource Conservation and Recovery Act (RCRA) regulations in 1980/82, however, the wastes
received by the landfill were later restricted to nonhazardous. The landfill activities (or lack
thereof) that lead to the current problems at the landfill include the disposal of various types of
wastes as well as the improper covering of the landfill wastes.

From at least 1968 to 1983, the landfill property was owned by Mr. Raymond DeWane and Ms.
Jean Farina (and, until his death, Mr. John L. DeWane). In 1983, the property ownership was
transferred to a Trust. In 1991, ownership of the property was transferred to L.A.E., directly.
Raymond E. DeWane and Jean A. Farina are the sole L. A.E. shareholders.

Prior to 1969 and until the early 1970's, a gravel pit operated out of the northeastern part of the
landfill site, in an area of from 5 to 10 acres. A 1966 aerial photograph documents that the
northwest and southern portions of the landfill site consisted of agricultural fields, while the
northeast quarter of the landfill contained generally disturbed soil with pockets of excavated soil
due to a gravel pit operation. The USGS 7.5 minute series 1970 topographical map of Belvidere
North Quadrangle (USGS, 1970) indicates that the northwest and southern portions of the landfill
consisted of agricultural fields, while the northeast quarter of the landfill consisted of a gravel pit.
The topographical contours suggest that the gravel pit covered approximately 5 to 10 acres with a
minimum basal elevation of somewhere between 770 to 780 feet mean sea level
(msl).

From 1969 to 1988, the landfill site property  was leased by various individuals and companies,
including: Mr. Jerome Kennedy, Mr. J.D. Mollendorf; Boone Landfill, Inc.; Boone Disposal Co.;
Bonus Landfill Co.; Rockford Disposal Service, Inc.; National Disposal Service; Browning-Ferris
Industries of Rockford, Inc.; Browning-Ferris Industries of Illinois;  and M.I.G. Investments. In
that time the property was operated as a landfill by these entities.

In February 1969, the landfill was registered with the State of Illinois and disposal  operations
began in the gravel pit. The State of Illinois landfill permits required the placement of a five-foot
compacted clay liner across the bottom of the pit, and vertically along the sidewalk Wastes
received were to be disposed of into the clay lined area, compacted, and covered with soil to form
a cell. Each daily cell was to be covered by six inches of soil. These and other permit

-------
requirements were required in an effort to protect the underlying groundwater from contamination
by the waste disposal. Groundwater monitoring wells were installed at various times and
locations.

In 1975, a gravitational flow leachate collection system was completed in the area that now
comprises the eastern 1/3 of the landfill. The system allowed landfill leachate to be collected and
drained through gravitational flow into a clay lined leachate collection lagoon or impoundment
which measured approximately 130 ft, by 130 ft, by 10 ft deep.

In 1984, an U.S. EPA contractor conducted a sampling inspection of the landfill. The sampling
inspection was conducted to provide information for evaluating the site for Superfund
consideration.

In 1985, the State of Illinois filed a complaint against the landfill operating company, M.I.G.
Investments, for violating their landfill-operating permit. The complaint alleged that the landfill
operators had violated their permit by allowing the top of the landfill to exceed, by more than 20
feet, the maximum elevation allowed in the operating permit.

The results of the 1984 sampling were used in the U.S. EPA's November 20, 1986 final report
evaluation and Hazardous Ranking Scoring (HRS) of the landfill. The evaluation, based on the
sampling inspection results and Site history, determined that the landfill leachate was apparently
contaminating  groundwater, soil, sediments, and noted potential exposure pathways for the
contaminants via direct contact, surface water, and groundwater.

In June 1988, a court ordered injunction was issued against M.I.G. Investments for being in
violation of the requirements of their landfill operating permit. The injunction required the landfill
operators to cease landfill operations. However, the injunction did not affect the need for the
owners to meet all the other numerous permit requirements and landfill regulations, such as
providing adequate landfill cover material, nor did it affect any necessary landfill  closure
requirements. The landfill ceased operations in June 1988. However, the landfill operators
abandoned it in July 1988 instead of closing the landfill as required by the State of Illinois
regulations.

In 1989, based upon the 1984 sampling inspection results, the 1986 evaluation and the HRS, the
Site was proposed for inclusion on the National Priorities List (NPL). This is a list identifying
sites throughout the U.S. that are eligible for study and cleanup, if necessary,  under the Superfund
program.

On August 30, 1990 the landfill site was placed on the NPL. Also, on October 29, 1990 the U.S.
EPA and a previous operator, Browning-Ferris, Inc. (BFI) entered into a Administrative Order on
Consent (Consent Order) for BFI to properly maintain the leachate surface impoundment by
repairing and raising the height of the earthen berms, and reducing the level of leachate waters to
insure that they do not over flow the impoundment.
                                             10

-------
In October 1990, the U.S. EPA began sending out Informational Request Letters pursuant to
Section 104 (e) of the Comprehensive Environmental Response, Compensation, and Liability Act
(CERCLA) to potentially responsible parties.

On December 19, 1990, the U.S. EPA sent out special notice letters to numerous parties
informing them of their potential liability with respect to the MIG/DeWane Site and offering them
the opportunity to perform a Remedial Investigation/Feasibility Study (RI/FS). The responding
parties formed a potentially responsible party group called "The MIG/DeWane Landfill Task
Force" (MLTF). These PRPs are the respondents in the Administrative Order on Consent
(Consent Order) dated March 29, 1991. The Consent Order was signed by the various
respondents, the Illinois EPA, and the U.S. EPA. These PRPs agreed to conduct a RI/FS.
Additional respondents signed onto the Consent Order at later dates. The dates when additional
PRPs signed onto the Consent Order include December 18, 1991, April 28, 1993, and August 2,
1995.

During March 1997, the final Baseline Risk Assessment report was completed. The final RI
Report was completed in July 1997.

In February 1999, the final FS that discusses and compares the potential clean-up remedial
alternatives was completed. Early in 1999 gas probes were installed along the western soil borrow
pit area boundary. In late April and early May  1999, extraction wells and an interceptor trench
were installed and activated to remove landfill gas migrating offsite. Also, gas and groundwater
sampling probes were installed in the Wycliffe  subdivision. Gas extraction system and gas probe
sampling continued throughout 1999,  and continues today.

Sampling for VOCs in groundwater from the soil borrow pit and within the subdivision occurred
in February 2000. An addendum to the baseline risk assessment will be based on the sampling
results from 1999 and 2000. If the baseline risk assessment addendum determines that an
unacceptable risk exists for the residents within the Wycliffe subdivision, then the remediation
upgrade contingencies will be re-evaluated to insure that human health and the environment will
be adequately protected.
III. Community Participation	

The Illinois EPA has taken the lead role in conducting a community relations program for the site.
At times the U.S. EPA had provided assistance. Concern about the site has remained somewhat
high, with public concern directed mainly to the presence of landfill gas in the proximity of their
homes on site rather than the presence of on-site chemical contaminants. A Community Relations
Plan (CRP) was developed and issued in March 1993, and a public information meeting was held
at the Ida Public Library to address community concerns at the
                                             11

-------
site.

The Illinois EPA has established an information repository for the MIG/DeWane Landfill at the
Ida Public Library in Belvidere, Illinois. Site investigation documents, site related decision
documents, the Administrative Record, and the Proposed Plan were placed in the repository.
Copies of the Proposed Plan were mailed to interested citizens and groups and were available at
the public hearing.

It was determined in late March 1999, that landfill gas had migrated over 750 ft. into a newly
developing subdivision. Methane gas was infiltrating homes through basement sump pits and
resulted in the recommended the evacuation of several homes. A series of public meetings were
held to inform the public of the situation.

A public comment period for the Proposed Plan was held from June  10, 1999 through August 13,
1999 to encourage public participation in the overall remedy selection process. Several requests
were received from individuals or groups for an extension. All requested extensions were granted
and comments from those parties were due August 27, 1999. The Proposed Plan was released on
July 13, 1999. Also, a public hearing for the Proposed Plan was held on July 13, 1999. At this
meeting, representatives from the Illinois EPA answered questions about problems at the site and
the remedial alternatives under consideration. Several requests were received from individuals or
groups for an extension. All requested extensions were granted and comments from those parties
were due Friday, August 27, 1999. A response to the comments received during this comment
period is included in the Responsiveness Summary, which is part of this Record of Decision.
IV. Scope and Role of Response Action	

Presumptive Remedies for CERLCA Municipal Landfills

Since CERCLA/Superfund's inception in 1980, the removal and remedial programs have found
that certain categories of sites have similar characteristics, such as types of contaminants present,
past industrial use, or environmental media affected. Based on a wealth of information acquired
from evaluating and cleaning these sites, Superfund undertook the presumptive remedy initiative
to develop remedies that are appropriate for specific site types and/or contaminants. One site
category for which the U.S. EPA developed a presumptive remedy is municipal landfills. The U.S.
EPA established containment as the presumptive remedy for landfills in September 1993. The
containment presumptive remedy includes the following components, as appropriate in a
site-specific basis:

       Landfill cap;

•      Source area ground-water control to contain plume;
                                             12

-------
       Leachate collection and treatment;

       Landfill gas collection and treatment;

•      Institutional controls to supplement engineering controls.

The overall strategy for cleaning up this Site included a combination of early emergency removal
actions conducted under the 1990 AOC, along with interim remedial measures conducted under
the 1991 AOC, the recent 1999 emergency response actions, coupled with the final, long-term
actions described in this ROD. This strategy is consistent with the presumptive remedies approach
identified by the U.S. EPA for municipal landfills.

Early Emergency Removal Actions

In May 1989, the Illinois EPA directed the emergency removal of approximately 80,000 gallons
of leachate from the leachate surface impoundment. This action was implemented under State
removal authority. This action and later leachate removal actions stopped the leachate from
overflowing the impoundment and contaminating property both on-site and off-site. These actions
also stopped the leachate from potentially contaminating adjacent intermittent streams and the
Kishwaukee River.

In June 1990, the USEPA, after a request from the Illinois EPA, undertook the removal of
approximately 75,000 additional gallons of leachate from the surface impoundment. This action
was implemented under Federal removal authority.

The leachate surface impoundment berms were repaired and increased in height in November
1990, as was  required by the October 29, 1990 Consent Order. This action was undertaken to
insure the leachate did not overflow the impoundment and contaminate soil and surface waters.

Interim Remedial Measures

During 1991,  the PRPs conducted interim remedial measures to stabilize the Site and mitigate the
more than  100 leachate flows coming from the landfill. The measures included:

(1)    Backfill and rough grading of the top and side slopes of the landfill to cover exposed
       refuse and allow for precipitation runoff;

(2)    Placement of topsoil (approximately 25,000 cu. yd.) over 90% of the side slopes;

(3)    Placement and compaction of soil (approximately 78,000 cu. yd.) onto the top of the
       landfill for the grading layer, and as an interim compacted 2-foot clay cover;

(4)    Placement of 17 settlement plates to monitor landfill settlement;
                                             13

-------
(5)    Sampling of ponded water and sediment located on northern most edge of landfill site;

(6)    Removal and sampling of one crushed 55 gallon drum, and adjacent soil from the
       northern edge of the landfill;

(7)    Soil sampling of the agricultural field (later to become the borrow pit soil) west of the
       landfill; and,

(8)    The extension of two gas vents on top of the landfill.

From 1992 to February 1993, the Interim Remedial Measures continued with

(1)    Placement and compaction of soil (approx. 90,500 cu. yd.) onto the top of the landfill to
       complete the grading layer;

(2)    Excavation of soil (3,463 cu. yd.) from the leachate contaminated storm water drainage
       channels on agricultural land adjacent to and north of the site, and backfilling of these
       areas with soil and topsoil (5,063 cu. yd.);

(3)    Removal of approximately 50,000 gals, of ponded storm water from the
       convergence/confluence of the  drainage channels;

(4)    Construction of a low permeability, 2-foot clay soil layer on the landfill crest;

(5)    Construction of a 6-inch vegetation soil layer of topsoil (38,000 cu. yd.);

(6)    Removal of ponded storm water and excavation of sediments from the northern most area
       of the site and backfilling of the area with soil;

(7)    Installation of a site security chain linked fence around the landfill site;

(8)    Property boundary site survey;

(9)    Rip-rap erosion control installation for storm water runoff north of the site;

(10)   Seeding, mulching, and erosion control measures for the interim cap/soil cover; and

(11)   Relocation of the  C&NW (Railroad) Transportation Company communication utility line
       from overhead to below ground on the north side of the tracks at the northern edge of the
       landfill site.

These capping actions were undertaken to provide additional cover for the landfill wastes. In
                                              14

-------
addition, the actions reduced the infiltration of precipitation into the landfill thus reducing leachate
generation and groundwater contamination. These interim actions were implemented under the
authority of the March 29, 1991 Consent Order.

During April 1993, to maintain the required freeboard or safe level  of leachate liquids within the
surface impoundment, the MLTF removed approximately 181,000 gallons of liquid from the
impoundment in April 1993. An additional 78,000 gallons of liquids were removed from the
leachate surface impoundment in July 1993. These interim remedial actions occurred under the
authority of both the  1990 and 1991 Consent Orders.

Recent Emergency  Response Actions

In mid-May 1999, the interception and emergency removal of landfill gas began in the area
adjacent to and west of the landfill, and within the subdivision. It was initially determined by the
PRPs in late March 1999 that the landfill gas had migrated over 700 ft. into the western most area
of the soil borrow pit. The soil borrow pit bordered the eastern boundary of the new Wycliffe
Estates subdivision, which was still under going development. In mid-April 1999 the PRPs
confirmed the presence of landfill gas and informed the Illinois EPA. The Illinois EPA responded
to the potential emergency situation by sampling homes within the subdivision for landfill gas and
VOCs. This emergency response action was implemented under the authority of the March 29,
1991 Consent Order.

The Illinois EPA response determined that there was methane gas in the basements and sumps of
some of the houses. A short-term evacuation was recommended for a few of the residences, due
to flammability conditions that existed in a few of the basement sumps. The Illinois EPA
responded with the assistance of the City of Belvidere and Boone County personnel. During the
initial emergency the PRPs representatives observed the sampling process. The PRPs and their
representatives, at the request of the Illinois EPA, installed landfill gas extractions wells east of
the subdivision, a gas  interceptor trench immediately West of the landfill, home gas monitors,
sump gas evacuation systems, and additional gas/groundwater sampling probes within the
subdivision. The landfill gas extraction system was installed and became operation less than one
month of the Illinois EPA determining that there was a gas migration problem. Within days of the
gas extractions system becoming operational, gas levels began to decline.

Planned Actions

•      Construction and operation of a leachate collection, removal and monitoring system.

•      Construction and operation of an active and passive landfill gas collection system and
       monitoring program.

       Leachate surface  impoundment closure.
                                             15

-------
       Surface water diversion system.

•      Implementation of access restrictions and institutional controls.

       Natural attenuation of groundwater.

•      Long-term groundwater monitoring.

•      Construction of a new cap over the entire landfill to minimize the infiltration of
       precipitation into the landfill.

       Prepare Risk Assessment addendum to address potential risk to Wycliffe subdivision.

The capping of the landfill will effectively reduce groundwater infiltration through the landfill
waste, thus reducing the generation of landfill leachate and gas. The landfill gas is presently being
actively remediated as mentioned above. Passive gas vents will be placed throughout the landfill
crest. Access restrictions and institutional controls will prevent access and exposure to
contaminants. The landfill cap and a leachate collection system will result in dramatically reduced
contamination to groundwater by contaminants such as VOCs. Contaminants presently in the
groundwater and soil are undergoing natural attenuation or intrinsic remediation due to the
composition and chemistry of the soil. Cleanup objectives for the Contaminants of Concern in the
groundwater will be the Maximum Contaminant Level (MCL) for Class I ground water. These
actions will be implemented under the authority of the March 29, 1991 Consent Order.


V. Site Characteristics

The organic  and inorganic contaminants identified at the landfill during the RI have several
potential pathways by which people may be exposed, if no further remedial action would occur.
The most pertinent pathways include direct contact, volatilization and wind dispersal, landfill gas,
erosion and runoff, surface water, and groundwater. These pathways are represented graphically
below as the site conceptual model.
                                              16

-------
                                         >  Z
                                         co  0
                                                              o
                                                              c
                                                              33
                                                              O
                                                              m
                                           o
                                                                    o
                                                                    I
>  S
2
m

H

                                                    GO
                                                    m
                                                    g
                                                    2
                                                    m
                                                    z
                                                                                   -o
                                                                                   03
                                                             C H
                                                             33 33
                                                             m >
                                                                                S  o
                                                                                >  3
                                                                                   GO
                                                                                   m
                                                                                   o
                                                                                m  o
                                                                                x  z
                                                                                -o  o
                                                                                O  >
                                                                                33  H
                                                                                m  33

                                                                                si
                                                                                g
                                                                                >
                  o
                  z
                                            8
                                            O
                                                  z
                                                  Q
                                                  m
                                                                     O
                                                                  m

                                                               33 5
                                                               °o
                                                               H «
                                                               m c
                                                               GO 33
                                                                  m
m TI

6 co


H m
                                                              33
                                                              m
                                                              GO
                                                              CO
                                                              m
                                                              33
                                                              CO
                                                               33
                                                               m
                                                               o

                                                               S
                                                               o
                                                               33
                                                               in
                                      17

-------
There is a potential for exposure to the contaminants onsite via direct contact with the landfill
surface soil, landfill leachate via seeps and sediment, and surface impoundment liquid and
sediment. There is also a potential for exposure to contaminants via direct contact with liquid
and soil associated with the two intermittent drainage channels in the field located north of the
landfill and the intermittent stream sediment and water. As noted in the baseline risk assessment,
direct or dermal contact with the soil and water is not expected to be significant and was not
evaluated at the site.

There is a potential for exposure to the contaminants in landfill gas, soils, and sediments via the
volatilization and wind pathway to individuals onsite and downwind.

There is a potential for exposure to the contaminants via the landfill gas pathway to onsite
workers who conduct subsurface activities and to offsite areas.

Erosion and runoff comprise an intermediate transport pathway for contaminants to migrate
from the landfill to the two intermittent drainage channels in the field located to the north of the
landfill, to the former landfill borrow area south of the landfill, to the intermittent stream east of
the landfill; and finally, to the Kishwaukee River.

There is a potential for exposure to the contaminants via the surface water pathway. Since the
Kishwaukee River is not used as a potable water source, the primary receptors for the surface
water pathway are aquatic and terrestrial wildlife that come into  contact with the waterway. The
RI determined that the surface water pathway does not currently serve as an exposure pathway
for landfill derived contaminants being transported to surface water receptors.

The RI had identified two primary groundwater pathways. These groundwater pathways are
referred to as the West Glacial Drift Pathway and the North Interface Pathway. Both of these
groundwater pathways have no direct receptors since there are no current users of the
impacted groundwater downgradient from the landfill and there is no realistic future potential for
groundwater use due to institutional  controls. Institutional controls such as zoning and health
code regulations, do not allow for building houses in the flood plain nor the placement of
drinking water wells. Additional institutional controls, such as dede restrictions on the use of this
property, will be implemented, if needed to supplement the zoning and health code regulations.
The groundwater pathways do comprise an intermediate transport pathway for contaminants to
migrate from the landfill  to surface water pathways and to future residential indoor air pathways.
An examination of the impact of Volatile Organic Compounds (VOCs) migrating along the
Western Glacial Drift pathway and then offgassing to future residential basement air was
evaluated as part of the baseline risk assessment using conservative contaminant migration and
attenuation assumptions.  The baseline risk assessment estimated that there might be low part
per
                                      18

-------
        billion concentrations of VOCs offgassing from the Western Glacial Drift groundwater that has
        the potential of posing a risk when coupled with gas migration. The potential exposure to landfill
        gases and VOCs is being addressed by the installation and start up of the landfill gas interceptor
        trench and gas extraction using withdraw wells. The baseline risk assessment determined that
        there may be a potential significant risk of future chronic exposures to residents with homes in or
        possibly near the soil borrow pit, if no further remedial actions occur. Additional sampling
        occurred February 2000 to provide updated information for an addendum to the original baseline
        risk assessment.

 Site Size

 The MIG/DeWane Landfill occupies an area of approximately 47 acres including an adjacent leachate
 surface impoundment near the eastern  slope of the landfill. The Site and surrounding area lies within the
 Rock River Hill Country physiographic province of Illinois and the Kishwaukee River Basin. The Rock
 River Hill Country is physiographic province as characterized by gently rolling topography, which is a
 result of Pleistocene glaciation that eroded, reshaped, and modified the landscape. The Kishwaukee River
 is located approximately 1,000 feet north of the landfill. The westward flowing Kishwaukee River and its
 tributaries drain most of Boone County. The Kishwaukee River is a major tributary to the Rock River,
 which is, located about 15 miles west of the city of Belvidere.

The regional topography is controlled mainly by bedrock, which is generally within 50 feet of the
 ground surface. Regionally, ground surface elevations in Boone County range from about 1,000 feet
 above Mean Sea Level (MSL) in northern Boone County to just below 700 feet above MSL along the
 Kishwaukee River in the south. The maximum ground surface elevation in the study area is approximately
 850 feet MSL. The minimum ground surface elevation  in the borrow pit west of the landfill is
 approximately 790 feet above MSL.

The landfill rises to a height of approximately 50 to 55 feet above the surrounding terrain. The landfill
 is bounded on the north by the Chicago and Northwestern railroad tracks and the  Commonwealth Edison
 right-of-way. Agricultural and commercial properties are located to the east and south of the landfill. A
 soil  borrow pit, used to provide soil for the interim landfill cap, abuts the west side of the landfill.
 Approximately 750 feet west of the landfill is a residential housing development.

 Surface and Subsurface Features

 As stated above, the 47-acre landfill rises to a height of approximately 50 to 55 feet above the  adjacent
 land surface and even higher above the adjacent soil borrow pit to the west. The estimated volume of
 waste within the landfill is approximately 3,715,200 cubic yards.

 There are no known "hot spots" areas  of highly toxic and/or mobile source material that represent
 principal threat waste). Historical records and physical evidence do not document any
                                                19

-------
discrete subsurface disposal areas. The existing leachate collection system was designed to allow gravity
drainage of leachate from the landfill to a single leachate lagoon (surface impoundment). The majority of
the leachate collection drain system was installed in the clay lined former gravel pit. The base of fill / top
of sandy till in areas located west of the former gravel pit were designed to slope at a 1 % grade from
west to east towards the leachate collection system.

Remedial Investigation Sampling Strategy

The primary objective of the RI is to evaluate the presence, nature, and extent of landfill contaminants in
various media in the Site study area. RI field activities were conducted during the following investigation
events: Round 1  (May 1993 to November 1993), Round 2 (October 1994 to January 1995, Round 3 (July
1995 to September 1995), Round 4 (November 1995), and the Supplemental Waste Delineation Survey
(September 1996 to October 1996). RI field efforts included the following tasks:

•       Installation of landfill leachate wells and gas probes.

•       Geophysical and soil boring delineation survey and a supplemental waste delineation survey to
        define the limits of the refuse disposal.

•       Surface impoundment geotechnical survey to evaluate its structural integrity.

•       Ambient air survey to evaluate the landfill's emission of volatile organic  compounds (VOCs) and
        methane.

•       Collection of leachate well liquid, leachate seep liquid and sediment, surface impoundment liquid
        and sediment, and gas probe vapor samples.

•       Advancement of 53 soil borings and installation of 27 monitoring wells.

•       Characterization of study area meteorology, surface water, soil, geology, and hydrogeology.

•       Ecological investigation that included a wetland delineation survey, ecological field survey,
        demographic survey, and a land use survey.

•       Collection of surface soil, vadose zone soil, and phreatic zone soil samples.

•       Collection of groundwater samples  from four residential well and 27 monitoring wells.

•       Collection of surface water and sediment samples from the intermittent stream and the
        Kishwaukee River.
                                               20

-------
Nature and Extent of Contamination

During the RI, samples were taken from the potential source areas and the potential migration pathways
at the Site.  The sources include the landfill, landfill gas, leachate surface impoundment, leachate, and the
media include groundwater, surface water, soil, leachate, gas/air and sediments. Additionally, groundwater
from four, off-site private supply wells were sampled to assess potential impacts from the Site related
wastes.

The inorganic and organic contaminants identified during the RI have several potential fate and transport
pathways. The propensity for migration of inorganics from the source areas is more limited than for the
organics. Migration of inorganics is limited because the contaminants is likely to undergo reactions such as
bonding with clay through adsorption or ion exchange; or bonding with organic materials by complex
reactions. Semi-Volatile Organic Contaminants (SVOCs) migrate more readily than inorganics; however,
their relatively low  solubilities inhibit their transport rate. VOC contaminants are typically the most mobile
and have the potential to migrate as a liquid and a gas. Various migration pathways are possible; however,
some pathways are more probable based on the physical characteristics and analytical data collected
during the RI. The most pertinent pathways are direct contact, volatilization and wind, landfill gas, erosion
and runoff, surface water, and groundwater.

Contaminant Source

The major source of contamination is the 47-acre landfill itself and, to a lesser extent, the leachate surface
impoundment. An estimated 3,700,000  cubic yards of waste is in currently occupying the landfill. The
main COCs for the site include organic compounds vinyl chloride, methylene chloride, 1,1-dichloroethene,
1,2-dicholopropane, tricholorethene, benzene and tetrachloroethene. In addition, the following inorganic
compounds are antimony, arsenic, chromium, iron, lead, manganese, mercury, nickel and boron. These
compounds were detected in groundwater monitoring wells, during the RI, at levels that meet or exceed
regulatory groundwater standards.

Groundwater flows predominately to the north and to a lesser extent northwest. Two principal horizontal
groundwater flow paths exist within the Glacial Drift aquifer. One path is north of the Kishwaukee River
and one path is south of river and west of the landfill. South of the Kishwaukee River in the immediate
vicinity of the landfill, groundwater flow in the Glacial Drift aquifer occurs predominantly west of the
landfill in the sand and gravel lens encountered at boring locations MW03, MW13, and MW14 (Till/Sand
Lens Zone). Groundwater flows through this sand and gravel lens in a northwesterly direction. Based on
the RI data, the Glacial Drift aquifer located along the north flank of the landfill does not appear to serve
as a principal groundwater flow pathway.
                                               21

-------
Contaminated Media

Media of concern include leachate, leachate sediments, soil, landfill gas, surface water, and ground-water.
Landfill leachate containing various chemicals is generated from the infiltration of precipitation into the
landfill.  It is the landfill leachate that appears to be responsible for the contamination of the other media.
The landfill gas contains many of the COCs designated as VOCs. All of the COCs identified by the
baseline risk assessment, both those that exceed and those that do not exceed the MCL include:

   VOCs:  Acetone, Benzene,  Chlorobenzene, Chloroethane; 1,1-Dichloroethane; 1,1-Dichloroethene;
    1,2-Dichloropropane, Ethybenzene, Methane,  Methylene Chloride, Tetrachloroethene, Toluene;
    1,1,2-Trichlorethane, Tricholoethene, and Vinyl Chloride.

    SVOCs: Benzo(A)Pyrene and 4-Methylphenol.

   Pesticides/PCBs: Dieldrin and Endrin Aldehyde.

   Inorganics:  Antimony, Arsenic, Beryllium, Iron, Lead, and Manganese.

Landfill Gas

Six gas probes were installed atop the landfill during the RI (since then another 12 probes have been
installed within or near the Wycliffe subdivision).  The results of two RI rounds of gas probe vapor
sampling indicated the presence of numerous VOCs at concentrations greater than 1,000 part per billion
volume (ppbv). These VOCs include: chloroethane (6,500 ppbv), acetone (1,600 ppbv),
1,1-Dichloroethane (2,800 ppbv), 2-Butanone (1,200 ppbv), Toluene (20,000 ppbv), ethylebenzene (5,500
ppbv), xylenes (13,000 ppbv). Also, the following contaminants were detected at concentrations between
50 and 1,000 ppbv:  methylene chloride (640 ppbv), benzene (330 ppbv), tetrachloroethene (89 ppbv), vinyl
chloride (700 ppbv), 1,1,1-trichloroethane (841 ppbv), trichloroethene (360 ppbv), and chlorobenzene (640
ppbv). Methane was detected in gas probe vapor at concentrations ranging from 10 to 50%.

Leachate

Leachate liquid sample were collected during two RI sampling rounds from two leachate wells atop the
landfill, 25 major leachate seep  locations around the perimeter of the  landfill, and the surface
impoundment. Leachate sediment samples were collected during two RI sampling rounds from 27 major
leachate seep locations around the perimeter of the landfill and from the bottom of the surface
impoundment. The analytical results from leachate liquid and sediment samples indicate the presence of
eight VOCs and five semi-volatile organic compounds (SVOCs) at concentrations above 1 part per million
(1 ppm).

Analytical results for leachate liquid samples indicate the presence of 11 inorganic analytes
                                              22

-------
detected in concentrations above background surface water and ground-water quality levels. Analytical
results from leachate sediment samples indicate the presence of inorganic analytes in leachate seep
sediment and surface impoundment sediment samples; however, the concentrations detected are less than
the U.S. EPA's Generic Soil Screening Levels (SSLs).

Soil

Surface and shallow subsurface soil sample were collected once during the IRM activities from  10
locations along the two intermittent drainage channels located in the field directly north of the landfill.
Surface soil, vadose zone soil, and phreatic zone soil samples were collected during one RI sampling
round. Surface soil samples were collected from 10 locations inside the perimeter of the landfill fence and
from nine locations outside the perimeter fence. At total of 14 vadose zone soil samples were collected
from eight soil borings located south of the Kishwaukee River. Phreatic zone soil samples were  collected
from nine soil borings located south of the Kishwaukee River and from one soil boring north of the river.

The analytical results for soil samples collected inside the perimeter of the landfill fence indicate the
presence of VOCs, SVOCs, pesticides, poly chlorinated biphenyls (PBCs), and inorganic analytes. All of
the VOCs detected in soil were also detected in leachate seep sediment samples; however,
concentrations in the soil were much lower than those detected in the sediment. Several VOCs were
detected in the sediment, but not detected in the soil. Many of the same SVOCs were detected in both
surface soil and sediment. The concentrations were similar in both surface soil and sediment except for
4-methylphenol, which was detected at higher concentrations in sediment. Trace to low concentrations of
organic and inorganic constituents  were detected in soil samples collected outside the fenced landfill
perimeter. The presence of low level pesticide concentrations detected outside of the landfill perimeter
fence is not attributed to  the landfill, but to the surrounding agricultural land use.

Analytical results from the IRM and RI soil sampling activities indicate that the soil outside the fenced
landfill source area has not been impacted by landfill source area constituents.

Residential Well Groundwater

Residential well groundwater samples were collected twice during the RI from four locations. Residential
well groundwater samples had no  detectable concentrations of VOCs, SVOCs, pesticides, and PCBs.
Except for nitrate+nitrite, the detected concentrations of inorganic analytes  in residential well samples are
typical of regional groundwater and were not above any regulatory groundwater standards. Tow of the
residential well samples  contained concentrations of nitrate+nitrite that were above its regulatory
groundwater standard. The presence of nitrate+nitrite can be attributed to the application of fertilizers and
the long history of farming activities that have occurred at these locations.

Monitoring Well Groundwater
                                               23

-------
Monitoring well groundwater samples were collected during four RI sampling rounds from 27 monitoring
wells. VOC, SVOC, and levels of inorganic analyte and wet chemistry parameter constituents above
background quality have been identified in the groundwater on the north and west sides of the landfill.
Concentrations of six VOCs, six inorganic analytes, and two wet chemistry parameters that may be
attributable to the landfill are above Class I groundwater quality criteria.

Surface Water and Sediments

Surface water and sediment samples were collected from the intermittent stream system and the
Kishwaukee River on during three RI field sampling events to characterize the chemical composition of
surface water and associated sediment in the study area. Surface water and sediment sampling took place
during Rounds 1, 2, and 4 field activities. The surface water and sediment sample were collected from
four locations along the intermittent stream. Two VOCs were detected in one intermittent stream surface
water sample. Carbon disulfide and toluene were detected at respective concentrations of approximately
3 J ug/L and 2 J ug/L. Three SVOCs were detected in intermittent stream water samples.
Di-n-butylphthalate, 4-methylphenol, and bis(2-ethlyhexyl)phthalate were detected a concentration of 2 J
ug/L, 3 J ug/L, and  4 J ug/L, respectively. Three VOCs and seventeen SVOCs were detected in
intermittent stream sediment samples. The three VOCs acetone, 2-butanone, and toluene were detected
at the respective concentrations of 9 and 100 J ug/kg, 33 ug/kg, and 2 J ug/kg. Seventeen SVOCs  were
detected in intermittent stream sediment samples. The seventeen detected SVOCs consisted of 4-
methylphenol, two phthalates, and fourteen PAHs. The detection levels for the seventeen chemicals
varied at four sample locations. Also detected were nine pesticide compounds at relatively low
concentrations. The intermittent stream receives runoff from agricultural fields. The pesticides are
indicative of past and current agricultural land use in the area. Two PCB compounds were detected at
low concentrations in intermittent stream sediment samples.

Surface water and sediment samples were collected from fifteen locations along the Kishwaukee River.
A few VOCs were detected in Kishwaukee River sediment samples. Three SVOCs were detected in
Kishwaukee River sediment samples. No pesticides were detected in Kishwaukee River sediment
samples. Three VOCs were detected in Kishwaukee River surface water samples.  Two SVOCs were
detected in Kishwaukee River surface water samples. No pesticides or PCBs were  detected in the
Kishwaukee River surface water samples.
VI. Current and Potential Future Site and Resource Uses

Land Uses:
                                             24

-------
The current on-site land use, is now and has been for the past 30 years, that of a landfill. The present
landfill, however, has not been in operation since 1988. Access to the landfill has already been restricted
through construction of a security fence around the entire perimeter of the Landfill with locking gates.
Institutional controls at the local level will be needed to prevent human exposure to risks associated with
the buried refuse at the Site and leachate constituents present in groundwater.

Offsite groundwater is also impacted by migration of contaminants from the site. Institutional controls are
already in place to restrict the use of offsite groundwater by current residential homes to the west of the
Landfill. On February 7, 1994, the City of Belvidere (City) annexed the residential development property
west of the IRM borrow pit. The IRM borrow pit is located west of the Landfill, and was identified as a
potential downgradient  receptor point for both impacted groundwater and landfill gas migration to the
west. As part of the annexation agreement (Agreement Numbers 5 and 6), the City agreed to provide
sanitary and water service to the annexed property. Consequently, water supply wells have not been, and
will not be, installed within the residential area to the west, thus removing offsite groundwater as a current
human exposure pathway. The landfill property will require deed restrictions. Although groundwater use
in the agricultural field north of the landfill is limited by flood plain zoning restrictions and Boone County
Health Department, the need for deed restrictions will be considered. Baseline sampling during the
Remedial Design/ Remedial Action activities will be used to evaluate the need for more specific
institutional controls.

The property to the north of the Site is identified on the Boone County Zoning Map as a floodplain and has
a special use land use designation. Given the identification of this property as a floodplain on the county's
zoning map, as well as  its lack of access to existing roads, it is not feasible that the property north of the
Site can be developed for residential purposes. This property has  been used for agricultural purposes in
the past.

Adjacent and surrounding land use off-site include the adjacent soil borrow pit, two residential
developments, a few small businesses, and agricultural fields.  Immediately to the west and adjacent to the
landfill is a soil borrow pit. Approximately 700 feet to the west is a residential development. To the north,
east, and south of the Site are agricultural fields. There are twelve water wells within one-half mile of the
Site. There are no wells being impacted by the landfill, downgradient of Site. Broken down into
percentages, the land use in this one-half mile radius of the Site is:

•   47% Agricultural

•   19% Developed (commercial and residential)

•   10% Wooded
                                               25

-------
•   5% Landfill

•   5% Wetlands

•   4% Planned future development (presently agricultural)

•   4% Commercial waste water discharge field

•   2% Waste fields and roadsides

•   2% Borrow field

•   2% Kishwaukee River and tributaries

Groundwater and Surface Water Uses:

Current ground/surface water use on the Site and the vicinity is limited to the use of the Kishwaukee
River for recreation and fishing. The groundwater in the vicinity of the Site is classified as a Class I
aquifer. Potential and future use of groundwater is restricted at and in the area of the Site due to local
zoning and health department restrictions, and to the extent further restrictions may be needed they will be
addressed after completion of the RD/RA baseline sampling.

Institutional controls are already in place to restrict the use of offsite groundwater by current residential
homes to the west of the Landfill. On February 7,  1994, the City of Belvidere (City) annexed property
west of the IRM borrow pit for residential development. The IRM borrow pit is located west of the
Landfill, and was identified as a potential downgradient receptor point for both impacted groundwater and
landfill gas migration to the west. As part of the annexation agreement, the City agreed to provide sanitary
and water service to the annexed property. Consequently, water supply wells have not been, and will not
be, installed within the residential area to the west, thus removing offsite groundwater (drinking water) as
a current human exposure pathway. Per the Boone County Health Department, a permit to install a
water-well will not be issued if municipal water is provided by the City. A deed restriction has been
placed on the IRM borrow pit property, which restricts the use of this property. This restriction prohibits
future residential development.

The groundwater at the Site and in the areas immediately  adjacent to the Site is not used as a drinking
water source. Private, drinking wells do exist north of the Kishwaukee River, but groundwater flow north
of the river is south towards the river.

Groundwater batch flushing model analysis and the groundwater flow path analysis were  integrated to
develop time frame estimates for monitored natural attenuation to attain Illinois

                                                26

-------
Class I ground-water quality criteria for the various scenarios that were evaluated. It should be noted that
alternative ground-water pump and treat or containment approaches, the other remedial actions that can be
considered for offsite ground-water, would not be any more effective as monitored natural attenuation for
the Site. The time frame required for monitored natural attenuation to reach Illinois Class I groundwater
quality criteria for the West Glacial  Pathway is estimated to range from 13 to 26 years. This groundwater
pathway is west-northwest under the soil borrow pit and part of the Wycliffe subdivision and then
northwest towards the Kishwaukee River. Residents within the subdivision are connecting to Belvidere
city water. The time frame is the same for the contingent leachate removal scenario.

The time frame required for natural  attenuation to reach Illinois Class I groundwater quality criteria of the
North Interface Pathway under the planned leachate removal scenario is estimated to range from 81 to
108 years. Whereas the time frame under the contingent leachate removal scenario with active
groundwater withdraw is estimated  to range from 54 to 81 years. The North Interface Pathway for
groundwater is directly north from the landfill towards the river.

The groundwater for this pathway runs under an agricultural field that is within the Kishwaukee flood
plain. The property to the north of the Site is identified on the Boone County Zoning Map as a floodplain
and has a special use land use designation. In accordance with Section 17.12 of the Boone County Zoning
Ordinance, no development can be allowed below the base flood elevation for the "Special Flood Hazard
Area" (SFHA) that would create a damaging or potentially damaging increase in flood heights or velocity
or threat to public health and safety. Section 17.3 of the Boone County Zoning Ordinance defines the base
flood elevation for the SFHA of the  Kishwaukee River as the 100-year floodplain. Given the identification
of this property as a floodplain on the county's zoning map, as well as its lack of access to existing roads,
it is not feasible that the property north of the Site can be developed for residential purposes.

A total of eight municipal wells provide potable water to the City of Belvidere. The closest municipal well
to the landfill is municipal well No. 7. This well is located approximately 4,000 feet southwest of the
landfill. The residential subdivisions on the west and south side of the study area are connected to the City
of Belvidere municipal water supply system.  The closest residential well to the landfill is located about
1,500 feet to the north of the landfill. The well is located north of the Kishwaukee River where
groundwater flow is southward, towards the river. Currently, there are no municipal, domestic, or
commercial wells located downgradient of the landfill (between the landfill and the Kishwaukee River).
Future land use analysis indicates that there is no potential for a municipal, domestic, or commercial well
to be installed in the area.

VII.  Summary of Site Risks

Baseline  Risk Assessment (Human  Health and Ecological Assessments)
                                               27

-------
The response action selected in this Record of Decision is necessary to protect the public health or
welfare or the environment from actual or threatened releases of hazardous substances into the
environment. Some remedial action is therefore warranted.

The baseline risk assessment contains both baseline human health and ecological risk assessments. The
risk assessments have been prepared to evaluate the potential for adverse effects and significant risks to
human and ecological receptors at and in the vicinity of the MIG/DeWane Landfill in Belvidere, Illinois.
The baseline risk assessment occurred after the interim response actions were completed, and during and
after the RI was completed. Information from the RI was used to complete the RI Report and the
baseline risk assessment. The possible risks associated with the site are those that are present or may
occur even though an interim cap is in place, and no further action occurs to remediate the site. The
baseline risk assessment for MIG/DeWane is a document titled,  Final Report Human Health and
Ecological Risk Assessment for the MIG/DeWane Landfill (March 1997). Both assessments use
site-related chemical  concentrations, exposure potential, and toxicity information to characterize potential
risks to human health and the environment.

Summary of Human Health Assessment

The baseline risk assessment estimates what risks the site poses if no action were taken. It provides the
basis for taking action and identifies the contaminants and exposure pathways that need to be addressed
by the remedial action. This section of the ROD summarizes the results of the baseline risk assessment
for this site.

The human health assessment portion of the baseline risk assessment evaluated both current and future
risks to trespassers and offsite residents associated with exposure to soil  sediment,  surface water, and
landfill gas via indoor and outside air. The risk assessment characterized contaminants and the potential
exposures in the absence of remediation in order to determine which risks need to be reduced or
eliminated.

The baseline risk assessment concluded that if no remediation occurs at the site a potential significant risk
to human health may exist at the site associated with the following exposure pathways: (1) acute
exposures to the surface impoundment; and  (2) future chronic exposure to residents with homes near the
borrow pit to the west of the landfill. Acute exposures are generally those that occur from high levels of
contaminant exposure over a short period of time. Chronic exposure are generally those that occur from
low levels of contaminant exposure over a long period of time.

The baseline risk assessment included both qualitative and quantitative evaluations of risk. Three human
health exposure scenarios were evaluated quantitatively: (1) child trespasser; (2) a current residential
scenario; and (3) a future residential scenario. Chronic exposures were evaluated for all three receptors,
while an acute exposure scenario was investigated for the child trespasser accidentally falling into the
surface impoundment.
                                               28

-------
The U.S. EPA has established a target risk range of 1 x 10~4 (one in ten thousand) to 1 x 10~6 (one in a
million) excess-lifetime Cancer Risk. For noncarcinogens, a Hazard Index is calculated. Remedial action
is considered warranted for environmental media having a lifetime cancer risk greater than 10~4 or a
hazardous index greater than 1.

One critical exposure pathway for the trespasser is an acute ingestion exposure of water and sediment
during an accidental fall into the leachate water surface impoundment. Iron in the impoundment sediment
is the chemical that drives the risk for the pathway for the trespasser. The hazardous index for the
sediment is 1.0. Iron also drives the risk above the threshold level in the incidental ingestion pathway of
leachate surface impoundment water. The hazardous index for the leachate surface impoundment
sediment is 5.8.

Indoor air exposures by inhalation of landfill gas and groundwater volatiles pose a potential significant risk
to future residents if they were to build in or near the soil borrow pit area to the west of the landfill site,
and no further remediation occurs. The cancer risk for future residents is  1.1 x 1O3. Chlorobenzene and
toluene are the chemicals that drive the noncarcinogenic risk in this scenario. Benzene and vinyl chloride
drive the carcinogenic risk. This scenario is considered reasonable given the proximity of some residences
to the western boundary of the soil borrow pit area. Additional sampling of for landfill gas, and for VOCs
has recently occurred in February 2000. The new sampling information will be used to update the baseline
risk assessment.

In addition to the above mentioned risks, landfill methane concentrations were previously determined by
the  baseline risk assessment to being a risk to public safety, due to flammability, should development occur
in soil borrow pit which is located adjacent to and west of the landfill. Recent new information from April
1999, also determined that methane gas presented a possible flammability risk for those individuals living
in the eastern area of the subdivision. The methane and landfill gas risks have been greatly reduced due to
the  installation and startup in May 1999 of a landfill gas extraction system and interceptor trench within
the  soil borrow pit area.

Groundwater, although contaminated, was eliminated as a complete critical contaminant pathway due to
institutional controls (i.e., zoning and health regulations) there should not be  any contact with or
consumption of the contaminated groundwater. Local residents use water supplied by the city. Local
regulations and zoning prohibited the installation of private drinking wells.  These institutional controls are
necessary to prevent human contact with the contaminated groundwater, thus eliminating the current
human groundwater risk. The Illinois EPA, and the PRPs determined that zoning laws and other
regulations would not allow for the  installation of private drinking wells on-site or areas off-site that were
contaminated. The installation of a new landfill cap will further protect the groundwater from infiltration
and precipitation-generated leachate. There is not a current completed pathway. However, the
groundwater path is considered a potential drinking water source and there is the potential for future
migration of contaminants through  groundwater to surface water. The groundwater will therefore need to
be remediated.
                                                29

-------
Section 1:  Chemicals of Concern (COCs)for the Human Health Assessment

The main COCs for the site include organic compounds vinyl chloride, methylene chloride, 1,1-
dichloroethene, 1,2-dichloropropane, tricholorethene, benzene and tetrachloroethene. In addition, the
following inorganic compounds are included: antimony, arsenic, chromium, iron, lead, manganese,
mercury, nickel and boron. These compounds were detected in groundwater monitoring wells, during the
RI, at levels that meet or exceed regulatory groundwater standards. The tables below show the maximum
concentrations detected of VOCs and SVOCs in the leachate and groundwater monitoring wells.
                                              30

-------
TABLE 4-1
MAXIMUM CONCENTRATION OF VOCS DETECTED
IN SOURCE AREA MEDIA
MIG/DeWane Landfill
Belvidere, Illinois
SOURCE AREA MEDIA
VOCS WITH MAXIMUM
DETECTED
CONCENTRATIONS
X > 1,000 ug/L, ug/kg, or ppbv
004.
005.
006.
009.
013.
022.
027.
029.
031.
033.
Chloroethane
Methylenechloride
Acetone
1 , 1 -Dichloroethane
2-Butanone
Benzene*
Tetrachloroethene*
Toluene
Ethylbenzene
Xylenes (Total)
Leachate
Well
Liquid
ug/L
U
U
17,000
U
46,000
11 J
U
1,000
190
660
Leachate
Seep
Sediment
ug/kg
U
12,000
13,000
720 J
22,000
1,500
2,100 J
5,200 J
4,500
36,000
Leachate
Seep
Liquid
ug/L
64
3,200
17,000 J
190 J
39,000 J
17 J
420 J
1,200
110
380
Surface
Impoundment
Liquid
Ug/L
U
53 J
6,600
U
3,700
U
U
210 J
U
120 J
Surface
Probe
Sediment
ug/kg
U
U
1,400 J
U
U
U
U
70 J
980 J
5,000
Gas
Vapor
Ppbv
6,500
640
1,600
2,800
1,200
330
89
20,000 E
5,500
13,000

SOURCE AREA MEDIA
VOCS WITH MAXIMUM
| DETECTED
CONCENTRATIONS
10 < X< 1,000 ug/L, ug/kg, or ppbv
003.
007.
014.
019.
025.
026.
030.
Vinylchloride*
Carbondisulfide
1,1, 1 -Trichloroethane
Trichloroethene*
4-Methyl-2-Pentanone
2-Hexanone
Chlorobenzene
Leachate
Well
Liquid
ug/L
6 J
U
U
U
430
39 J
U
Leachate
Seep
Sediment
ug/kg
U
U
U
350 J
250 B
870
U
Leachate
Seep
Liquid
ug/L
U
U
U
340 J
160 J
U
11 J
Surface
Impoundment
Liquid
ug/L
U
U
U
U
340 J
U
U
Surface
Probe
Sediment
ug/kg
U
19 J
U
U
U
U
U
Gas
Vapor
Ppbv
700
U
841
360
U
U
640
—bNOTES:   ug/L = microgram per liter or part per billion (ppb).
              ug/kg = microgram per kilogram or part per billion (ppb).
              ppbv = part per billion volume (ppbv).
              * = This VOC was detected in monitoring well groundwater samples at concentrations above
                 above regulatory groundwater standards.
              J = Reported result is quantitatively estimated.
              U = Not detected.
              B = Constituent also present in laboratory blank.
              E = Constituent concentration exceeds the value listed.
                                                          31

-------
TABLE 4-2
MAXIMUM CONCENTRATION OF SVOCS DETECTED
IN SOURCE AREA MEDIA
MIG/DeWane Landfill
Belvidere, Illinois
SOURCE AREA MEDIA
SVOCS WITH MAXIMUM
DETECTED
CONCENTRATIONS
X > 1,000 ug/L, or ug/kg
034.
042.
052.
080.
090.
Phenol
4-Methylphenol
Napthalene
Phenanthrene
Bis(2-ethylhexyl)phthalate
Leachate
Well
Liquid
ug/L
3,400J
20,OOOJ
48J
U
12J
Leachate
Seep
Sediment
ug/kg
12,OOOJ
76,000
1,200 J
2,700 J
320J
Leachate
Seep
Liquid
ug/L
7,100J
12,OOOJ
20J
4J
U
Surface
Impoundment
Liquid
Ug/L
2,400J
4,200J
U
U
u
Surface
Impoundment
Sediment
ug/kg
U
2,100J
660J
200J
3,900
SOURCE AREA MEDIA
SVOCS WITH MAXIMUM
DETECTED
CONCENTRATIONS
10 < X< 1,000 ug/L or ug/kg
038.
040.
046.
048.
055.
056.
066.
071.
073.
076.
079.
082.
083.
084.
085.
086.
088.
089.
091.
092.
093.
094.
095.
097.
1,4-Dichlorobenzene
2-Methylphenol
Isophorone
2,4-Dimethylphenol
4-Chloro-3-methylphenol
2-Methylnaphthalene
Acenaphthene
Diethylphthalate
Fluorene
N-Nitrosodiphenylamine
Pentachlorophenol
Carbazole
Di-n-butylphthalate
Fluoranthene
Pyrene
Butylbenzylphthalate
Benzo(a)anthracene
Chrysene
Di-n-octylphthalate
Benzo(b)fluoranthene
Benzo(k)fluoranthene
Benzo(a)pyrene
Indeno(l,2,3-c,d)pyrene
Benzo(g,h,i)perylene
Leachate
Well
Liquid
ug/L
32J
11J
11J
55J
U
300
U
35J
U
U
U
79J
U
10J
in
u
U
u
u
u
u
u
u
u
Leachate
Seep
Sediment
ug/kg
U
U
U
u
u
u
58J
530J
70J
U
190J
53J
U
120J
91J
U
U
u
u
44J
U
U
u
u
Leachate
Seep
Liquid
ug/L
7J
U
U
14J
42J
22J
U
22
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
Surface
Impoundment
Liquid
ug/L
U
U
U
u
u
u
u
160J
U
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
Surface
Impoundment
Sediment
ug/kg
U
76J
U
U
U
u
u
96J
180J
120J
U
160J
88J
470J
370J
180J
190J
220J
460J
170J
190J
180J
110J
82J
32

-------
 NOTES:         ug/L =  microgram per liter or part per billion (ppb).

                ug/kg = microgram per kilogram or part per billion (ppb).

                J = Reported result is quantitatively estimated.

                U = Not detected.
The RI investigation involved sampling soil, leachate, landfill gas, surface water and surface sediments.
RI sampling determined that some contaminants in groundwater and leachate exceeded Maximum
Contaminant Levels (MCLs). VOCs, SVOCs and inorganic chemical compounds were detected.
Because of the presence of these chemicals, an assessment was conducted to estimate the possible
health and environmental risks that could result if the contamination in the soil, leachate, sediments,
landfill gas, surface water and groundwater were not addressed. The assessment, commonly referred to
as the baseline risk assessment, evaluated current and future potential human health and environmental
risks from exposure to chemicals associated with the site at the time of the remedial investigation. Other
contaminants were identified, but at levels below regulatory standards.

VOCs:  Acetone, Benzene, Chlorobenzene, Chloroethane; 1,1-Dichloroethane;  1,1-Dichloroethene;
1,2-Dichloropropane, Ethybenzene, Methane, Methylene Chloride, Tetrachloroethene, Toluene;
1,1,2-Trichlorethane, Tricholoethene, and Vinyl Chloride.

SVOCs: Benzo(A)Pyrene and 4-Methylphenol.

Pesticides/PCBs: Dieldrin and Endrin Aldehyde.

Inorganics: Antimony, Arsenic, Beryllium, Iron, Lead, and Manganese.

Contaminated Media

Media of concern includes leachate, leachate sediments, soil, landfill gas, surface water, and
groundwater. Landfill leachate containing various chemicals is generated from the infiltration of
precipitation into the landfill. It is the landfill leachate that appears to be responsible for the
contamination of the other media. The landfill gas contains many of the COCs designated as VOCs.

Data Usability:

Data usability is the process of determining whether or not the quality of the data generated during the
sampling program meets the intended use, in this case for the risk assessment purposes. Important data
usability issues evaluated in a risk assessment include: (1)  data sources; (2) sampling procedures; (3)
analytical methods  and detection limits; (4) data quality
                                              33

-------
indicators; and (5) data review and validation.

Uncertainty Analysis:

Certain assumptions underlying any human health risk assessment introduce uncertainty into the results
and conclusions. To compensate for uncertainty surrounding input varibles, conservative assumptions
are often made which tend to overestimate rather than underestimate risk. In general, assumptions made
throughout the risk assessment for this site are conservative in that they do tend to overestimate
exposure and resultant health risks rather than underestimate them.

Three sources of uncertainty were identified in pursuit of the Human Health Risk Assessment:

     Scenario uncertainty- This category includes errors resulting from missing or incomplete
     information needed to fully define exposure and dose. This may include errors in site information,
     professional judgement, assumptions regarding exposed populations, and steady-state conditions.

     Parameter uncertainty—Sources of parameter uncertainty include measurement and sampling
     errors, inherent variability in environmental and exposure-related parameters, and the use of
     generic surrogate data when site-specific data are not available.

     Model uncertainty—Model uncertainty is often an outgrowth of parameter uncertainty. One
     source of modeling uncertainty is relationship errors, such as errors in correlations between
     chemical properties. Errors due to the use of mathematical or conceptual models as simplified
     representations of reality are also sources of modeling uncertainty.

The uncertainties are presented in the following table.
                                               34

-------
ASSUMPTION
1. Chemical Data Base
Representativeness of
characterization data base
Treatment of nondetect values
Exclusion from risk assessment
of compounds detected at less
than 5% frequency of detection
Exclusion from risk assessment
of compounds detected at less
than naturally occurring
background concentrations
Exclusion from risk assessment
of compounds detected that are
essential nutrients
Use of unfiltered, not filtered
intermittent stream sampling
results
II. Toxicity Assessment
Exclusion from risk assessment
of compounds with no toxicity
information available
Use of provisional chronic
reference dose for iron
Substituting chronic toxicity values
for acute values when no acute
values exist
Use of upper-bound cancer slope
factors to evaluate risks
Use of RfDs which incorporate
uncertainty factors
evaluate risks
POTENTIAL MAGNITUDE
FOR OVER-ESTIMATION
OF RISK






Low



Medium
Medium
Medium
POTENTIAL MAGNITUDE
FOR UNDER-ESTIMATION
OF RISK



Medium
Low
Low


Low




POTENTIAL MAGNITUDE
FOR OVER OR UNDER
ESTIMATION OF RISK

Low
Medium






Medium



35

-------
ASSUMPTION
Frequency of exposure to each
medium
Duration of exposure
Soil ingestion rate
Exposure to contaminants
remaining constant over exposure
period
Exclusion of dermal exposure from
Evaluation
Substituting maximum
concentration as EPC
Use of models to eliminate air
exposure point concentrations
Body weight
IV. Risk Characterization
Risk add itivity
Carcinogens
non-carcinogens
POTENTIAL MAGNITUDE
FOR OVER-ESTIMATION
OF RISK
Medium
Medium

Medium

Medium




POTENTIAL MAGNITUDE
FOR UNDER-ESTIMATION
OF RISK




Low





POTENTIAL MAGNITUDE
FOR OVER OR UNDER
ESTIMATION OF RISK


Low



Medium
Low

Medium
Medium
Nature and Extent of Contamination

The contaminants of concern in the various media at the MIG/DeWane landfill RI study area are as
follows:

•     Ambient air survey data indicate that VOCs and methane have been detected across the landfill
      surface at relatively low but variable concentrations.

•     Gas probe results indicate the presence of 7 VOCs, in landfill gas at the landfill, at
                                               36

-------
concentrations greater than 1 ppmv, but less than 21 ppmv. The VOCS included chloroethane, acetone,
1,1-dichloroethane, 2-butanone, toluene, ethylbenzene, and xylenes. Eight other VOCs were detected in
the gas at maximum concentrations between 0.5 ppmv and 1 ppmv. The 8 VOCs were vinyl chloride,
methylene chloride, 1,1,1-trichloroethane, trichloroethene, benzene, tetrachloroethene, chlorobenzene, and
cis-l,2-dichloroethene. Methane was detected in gas probe vapors at concentrations ranging from 10
percent to 50 percent of the total volume of landfill gas.

Gas probe results for the 6 gas probes installed in March 1999 along the western edge of the landfill
soil borrow pit indicate the presence of methane gas in 5 of the 6 gas probes. Readings from the 6
gas probes installed in the nearby subdivision ranged from 0 percent to 54 percent of the total
volume of gas.

Results from the leachate seep sediment sampling detected the presence of 8 VOCs and 13
Semi-VOCs (SVOCs). The VOCs include acetone, 2-butanone, toluene, and xylene with respective
maximum concentrations of 13 ppm, 22 ppm, 5.2 ppm and 36 ppm. Also, the VOCs included
methylene chloride, benzene, tetrachloroethene, and ethylbenzene which were detected with
respective maximum concentrations of 12 ppm, 1.5 ppm, 2.1 ppm, and 4.5 ppm. The 13 SVOCs
were detected in leachate seep sediment. Phenol and 4-methylphenol had respective maximum
concentrations of 12 ppm and 76 ppm. Napthalene and phenanthrene were detected at
concentrations of 1.2 ppm and 2.7 ppm, respectively. Nine other SVOCs were detected at
concentrations below 1.0 ppm.

Nine pesticides were detected at low concentrations in leachate seep sediment samples. Only two
pesticides were detected at concentrations above .001  ppm or 10 ppb. Dieldrin was detected at a
concentration of 11 ppb and methoxychlor was detected at 12 ppb.

Four PCB compounds were detected at low concentrations in the leachate seep sediment samples.
The maximum concentration of the detected PCBs was 180 ppb.

The sample results from the RI detected in the leachate the presence of 13 inorganic compounds at
concentrations above background surface water levels and regulatory groundwater standards.

Soil sample results from the landfill area detected the presence of VOCs, Semi-VOCS, pesticides,
PCBs, and inorganic compounds. All the VOCs detected in soil were also detected in leachate seep
sediments; however, the concentrations in the soil were much lower than those detected in the
sediment. Several VOCs were detected in soil that were not detected in sediment. Trace to low
concentrations of organic and inorganic chemicals were detected in soil samples collected outside,
but nearby, the landfill fence perimeter. The presence of low level pesticide concentrations detected
outside the fenced perimeter are not attributed to the landfill, but to the surrounding agricultural land
use.
                                         37

-------
•     Residential well ground-water samples had no detectable concentrations of VOCs, Semi-VOCs,
      pesticides, or PCBs. The detected concentrations of inorganic chemicals in the residential well
      samples are typical of native groundwater and were not above any regulatory groundwater
      standards. Two of the residential wells did contain concentrations of nitrate/nitrite that were slightly
      above regulatory standard. The presence of nitrate/nitrite can be attributed to the application of
      fertilizers and the long history of farming activities that have occurred at these locations.

•     Groundwater monitoring well samples detected concentrations of 6 VOCs, and 9 inorganic
      compounds that are believed to be attributable to the landfill and are at or above regulatory
      groundwater standards (see contaminants of concern, above). The VOCs are vinyl chloride,
      methylene chloride, 1,1-dichloroethene, 1,2-dichloropropane, trichloroethene, benzene, and
      tetrachloroethene. The inorganics are antimony, arsenic, chromium, iron, lead, manganese, mercury,
      nickel and boron.

•     Surface water and surface water sediments samples were collected during three RI sampling
      rounds from four locations along the intermittent stream and from fifteen locations along the
      Kishwaukee River. There are no detected differences between surface water samples collected
      from the Kishwaukee River upstream, closest to, or downstream of the landfill.

Section 2: Exposure Assessment

The organic and inorganic contaminants identified at the landfill during the RI have several potential
pathways by which people may be exposed, if no further remedial action would occur. The most pertinent
pathways include direct contact, volatilization and wind dispersal, landfill gas, erosion  and runoff, surface
water, and groundwater.

•     There is a potential for exposure to the contaminants onsite  via direct contact with the landfill
      surface soil, landfill leachate via seeps and sediment, and surface impoundment  liquid and sediment.
      There is also a potential for exposure to contaminants via direct contact with liquid and soil
      associated with the two intermittent drainage channels in the field located north  of the landfill and
      the intermittent stream sediment and water. As noted in the baseline risk assessment, direct or
      dermal contact with the soil and water is not expected to be significant and was not evaluated at the
      site.

•     There is a potential for exposure to the contaminants in landfill gas, soils, and sediments via the
      volatilization and wind pathway to individuals onsite and downwind.

•     There is a potential for exposure to the contaminants via the landfill gas pathway to onsite workers
      who conduct subsurface activities and to offsite areas.
                                                38

-------
•     Erosion and runoff comprise an intermediate transport pathway for contaminants to migrate from
      the landfill to the two intermittent drainage channels in the field located to the north of the landfill, to
      the former landfill borrow area south of the landfill, to the intermittent stream east of the landfill;
      and finally, to the Kishwaukee River.

•     There is a potential for exposure to the contaminants via the surface water pathway. Since the
      Kishwaukee River is not used as a potable water source, the primary receptors for the surface
      water pathway are aquatic and terrestrial wildlife that come into contact with the waterway. The
      RI determined that the surface water pathway does not currently serve as an exposure pathway for
      landfill derived contaminants being transported to surface water receptors.

•     The RI had identified two primary groundwater pathways.  These groundwater pathways are
      referred to as the West Glacial Drift Pathway and the North Interface Pathway. Both of these
      groundwater pathways have no direct receptors since there are no current users of the impacted
      groundwater downgradient from the landfill and there is no realistic future potential for groundwater
      use due to institutional controls. Institutional controls such as zoning and health code regulations do
      not allow for building houses in the flood plain nor the placement of drinking water wells.  The
      groundwater pathways do comprise an intermediate transport pathway for contaminants to migrate
      from the landfill to surface water pathways and to future residential indoor air pathways.  An
      examination of the impact of VOCs migrating along the Western Glacial Drift pathway and then
      offgassing to future residential basement air was evaluated as  part of the baseline risk assessment
      using conservative contaminant migration and attenuation assumptions.  The baseline risk
      assessment estimated that there may be low part per billion concentrations of VOCs offgassing
      from the Western Glacial Drift groundwater.

The potential exposure to landfill gases has been addressed to an extent by the installation and start up of
the landfill gas interceptor trench and gas extractions system.

Current and Potential Site Risks;

The baseline risk assessment characterizes contaminants and potential  exposures in the absence of
remediation in order to determine which risks need to be reduced or eliminated. Three human health
exposure scenarios were evaluated:  (1) child trespasser; (2) a current residential scenario, and (3) future
residential scenario.  Based on the exposure pathways evaluated in the baseline risk assessment, a
significant risk to human health does exist at the site associated with following pathways:  (1) acute
exposures to the leachate surface impoundment; and (2) future  chronic exposure to residents with homes
near the borrow pit. These risks will be eliminated or severely minimized with the implementation of the
remedial alternatives.

A critical exposure pathway for the trespasser is acute ingestion exposure of liquid and sediment
                                               39

-------
during an accidental fall into the surface impoundment. Iron is the chemical of concern for the risk to
trespassers. The incidental ingestion of iron from leachate seep water, also drives the risk to trespassers.

The baseline risk assessment determined that indoor air exposures by inhalation of landfill gas and
groundwater volatiles pose a significant risk via chronic exposure to future residents living in the soil
borrow pit area, adjacent to the western edge of the landfill site. The contaminants of concern that drive
the noncarcinogenic risk include chlorobenzene and toluene. Benzene and vinyl chloride drive the
carcinogenic risk.

A number of quantitative assumptions were made in the risk assessment, which resulted in uncertainty
associated with the presumed exposure conditions. Among these is the use of maximum detected
concentrations for some chemicals and some media for which data sets were limited.

Methane gas concentrations, as determined during the Rl, may present a risk to public safety should
housing development occur within the soil borrow pit. Levels of methane were detected in the pit area in
excess of the lower explosive limit for methane.

The analysis of risk associated with the landfill site included using the data collected during the RI,
computer modeling, and scientific literature reviews. Certain assumptions underlying any human health
risk assessment introduce some uncertainty into the results and conclusions. This uncertainty is generally
due to numerous variables  associated with individuals. To compensate for uncertainty, conservative
assumptions are often made which tend to overestimate rather than underestimate risk. Overall, the
conservative assumptions in this baseline risk assessment are thought to result in a risk estimate that
exceeds the actual site-specific risk. In other words, due to the conservative assumption, the actual risk
from the site may be less than estimated. The contamination or chemicals of concern associated with the
landfill site, although possessing a risk to human health and the environment, can be adequately
remediated.

Groundwater was not identified in the Baseline Risk Assessment as a primary media of concern for
human health or ecological pathways. The groundwater between the landfill and the Kishwaukee River is
not presently, and is not likely in the future (due to institutional controls and property access restrictions),
to be used as a potable water supply. As documented by data collected during the RI, the groundwater
downgradient of the landfill Site discharges to the Kishwaukee River. However, the RI groundwater
sampling determined that contaminated groundwater from the landfill is not currently impacting the river.
The potential does exist, however,  for contaminated groundwater impacting the surface water quality of
the river. It should be noted that the Kishwaukee River is not a source of potable water supplies.
Therefore, the  potential human health concern is related only  to the consumption of aquatic species (i.e.,
fish) from the river.  Given the above, the protection of the surface water quality and the ecology of the
Kishwaukee River is the primary concern with respect to groundwater remediation. Therefore,
groundwater action levels have been established to be protective of surface water
                                               40

-------
quality.

Section 3:  Toxicity Assessment

The purpose of the toxicity assessment is to review toxicity and carcinogenicity data for the Chemicals of
Potential Concern ("COPCs"), and to provide an estimate of the relationship between the extent of
exposure to these contaminants and the likelihood and/or severity of adverse effects. The toxicity
assessment is accomplished in two steps: hazard identification and dose-response assessment.

The hazard identification is a qualitative description of the potential toxic effects of the  COPC.

Carcinogens

The U.S. EPA has developed a qualitative weight-of-evidence classification system to define a chemical's
potential to cause carcinogenic effects. This classification is based on carcinogenicity results from
long-term animal tests, epidemiological studies, and other supportive data. The U.S. EPA separates
chemicals into five distinct categories, ranging from Group A, chemicals for which there is sufficient
evidence to consider the chemical carcinogenic to humans, to Group E, chemicals for which there is
evidence of noncarcinogenicity in humans. Chemicals which have been classified in Group A through
Group C were included in the quantitative  risk assessment. Slope factors and unit risk values are
calculated by the U.S. EPA's Carcinogen Assessment Group (CAG) and verified by the Carcinogen Risk
Assessment Verification Endeavor Workgroup (CRAVE). The slope factor is 95% upper bound estimate
of the slope of the dose/response curve for a particular study or group of studies involving the exposure of
humans or animals.  These slope factors are used to estimate the risks associated with oral exposure to
potential carcinogens. Unit risks, or the risk associated with lifetime exposure to 1 ug/m3 of a chemical in
air, were used to evaluate inhalation exposures.

Noncarcinogens

The determination of the health hazards associated with exposure to noncarcinogens is made by
comparing the estimated chronic intake of a compound with the reference dose (RfD) for oral exposures
or the reference concentration (RfC) for inhalation exposures. For the MIG/DeWane risk assessment,
chronic RfDs and RfCs were used for the determination.

A chronic RfD is defined as an estimate of a daily exposure level, or in the case of RfCs, a daily exposure
concentration, for the human population, including sensitive subpopulations,  that is  likely to be without an
appreciable risk of harmful effects during a lifetime exposure. The RfDs and RfCs are specifically
developed to be protective of long term exposure to a compound. A RfD or RfC is typically derived by
applying a safety factor on of one or more orders of magnitude to  a dose thought  to represent a no
observed adverse effect level (NOAEL) in humans. The magnitude of the  uncertainty factors that are
applied when developing and RfD or RfC is
                                               41

-------
dependent on the quality and applicability of the available animal and human toxicity studies.

Subchronic RfDs and RfCs have been developed for some chemicals to assess exposures between two
weeks and seven years. Acute RfDs and RfCs are developed on a case by case basis for even shorter
exposure durations, such as those associated with an accidental fall into the leachate surface
impoundment.

An acute RFD was developed from the one-day health advisories published by the U.S. EPA (EPA,
1992). For the chemicals of concern detected in the surface impoundment, one-day health advisories
were available for antimony and beryllium. A minimum risk level ("MRL") was developed by the Agency
of Toxic Substances and Disease Registry ("ASDDR"). This MRL is based on a NOAEL of 5mg/kg
(day and a Lowest Observed Adverse Effects Level ("LOAEL") of 50 mg/kg/day associated with
neurological effects in rabbits (ATSDR, 1991). These values were used in the assessment of surface
impoundment exposures. An acute RFD was not available for iron. The chronic RFD used in the risk
assessment is a provisional value developed by the U.S. EPA Superfund Health Risk Technical Support
Center.

Section 4: Risk Characterization

Potential cancer risks are assessed by multiplying the estimated lifetime average daily intake (LADI) of a
carcinogen by its slope factor ("SF"). This calculated risk is expressed as the probability of an individual
developing cancer over a lifetime and is an estimated upper-bound incremental probability. Cancer risks
initially are estimated separately for exposure to each chemical for each exposure pathway and receptor
category (i.e., adult or child). Separate cancer risk estimates then are summed across chemicals,
receptors, and all exposure pathways applicable to the same population to obtain the total excess lifetime
cancer risk for that population. Cancer risk estimates are provided in scientific notation; 1 x 10~6 is
equivalent to 1E-6, which equals 0.000001.

The potential for adverse effects resulting from exposure to a noncarcinogen is assessed by comparing
the estimated chronic daily intake ("GDI") or Subchronic Daily Intake ("SDI") of a substance to its
chronic  or Subchronic RfD. This comparison is made by calculating the ratio  of the estimated GDI or SDI
to the corresponding RfD to yield a hazard quotient ("HQ"). HQs that are associated with similar critical
effects (e.g., liver damage) should be summed together to obtain a hazard index ("HI") for that effect,
whereas HQs for different critical effects should be kept separate. However, for screening purposes,
HQs are commonly summed across all chemicals, exposure routes, and pathways applicable  to a given
population to obtain an HI for that population.

For evaluating noncarcinogenic effects, U.S. EPA defines acceptable exposure levels as those to which
the human population, including sensitive subgroups, may be exposed without adverse effects during a
lifetime or part of a lifetime, incorporating an adequate margin of safety (EPA 1989). This acceptable
exposure level is approximated by a HI less than or equal to 1.0.
                                               42

-------
Non-cancer risks are usually assessed by calculating a hazard quotient, which is the ratio of the estimated
exposure to the RfD as follows:
 where:
           HQ    =    Hazard quotient;
           GDI   =    Chronic daily intake (exposure); and
           RfD   =    Reference dose (acceptable daily intake).
 These risks are summarized in the following table
                      Summary of Carcinogenic and Noncarcinogenic Risks

                                       MIG/DeWane Landfill
                                         Belvidere, Illinois
RECEPTOR

TRESPASSER
Soil/Sediment
Onsite Soil
Offsite Soil
Drainage Channel Soil
Intermittent Stream Sediment
Leachate Seep Sediment


Surface Water
Intermittent Stream Water
Leachate Seep Water


Acute Exposure
Surface Water Impoundment Water
Surface Water Impoundment


MEDIA-
SPECIFIC
HAZARD INDEX
(unitless)



1 .2E-05
4.6E-03
2.6E-05
0
5.9E-03



1.8E-01
7.8E-01



1 .OE+00
5.8E+00


DISTRIBUTION OF
NONCARCINOGENIC
RISK BY MEDIA
(%)



0%
0%
0%
0%
0%



2%
10%



13%
75%


MEDIA
SPECFIC
CANCER RISK
(unitless)



5.1E-08
2.7E-08
3.0E-09
1 .2E-08
0



2.2E-06
1.1E-06



9.7E-10
2.5E-09


DISTRIBUTION
OF
CARCINOGENIC
RISK BY MEDIA
(%)



1%
1%
0%
0%
0%



64%
31%



0%
0%


                                               43

-------
Air
Onsite Ambient Air
Offsite Ambient Air

Totals=


CURRENT RESIDENT
Air
Ambient Air

Totals=


FUTURE RESIDENT
Air
Indoor Air from landfill
gas/groundwater
Ambient Air

Totals=

6.7E-04
5.5E-04

7.8+00




1.1E-03

1.1E-03




4.1E+00
1 .5E-03

4.1E+00

0%
0%

100%




100%

100%




100%
0%

100%





















5.3E-08
4.7E-08

3.5E-06




2.8E-07

2.8E-07




1.1E-03
3.6E-07

1.1E-03

2%
1%

100%




100%

100%




100%
0%

100%
               Source:
Illinois EPA's Baseline Risk Assessment (COM, 1997)
Ecological Assessment

The Ecological Risk Assessment ("ERA") evaluates the likelihood that adverse ecological effects may
occur or are occurring at a site as a result of exposure to single or multiple chemical or physical stressors.
Risks result from contact between ecological receptors (i.e., plants, animals, fish) and stressors (i.e.,
chemicals) that are of sufficiently long duration and of sufficient intensity to elicit adverse effects. The
primary purpose of the ERA is to identify and describe actual or potential onsite conditions that can result
in adverse effects to present or future ecological receptors.

The ERA focused on primary ecological stressors and exposure pathways identified as being associated
with the site. The primary stressors were identified as having potential to cause ecological stress include
many inorganic and organic chemicals in (1) onsite surface water, (2) leachate surface impoundment and
intermittent stream sediments, and (3) leachate seep, drainage channel, and onsite and offsite surface
soils. Preliminarily identified potential chemical stressors
                                                44

-------
include a wide variety of chemicals including inorganics (metals), volatile organic compounds, and
semi-volatile organic compounds, such as polychlorinated biphenyls ("PCBs"), polycyclic aromatic
hydrocarbons ("PAHs"), and pesticides.

The final baseline ERA identified risks to representative ecological receptors from exposure to selected
chemicals of concern as follows.
    Aquatic biota such as aquatic plants (algae), zooplankton (daphnids), sensitive bethic invertebrates,
    and sensitive fish species are likely to be adversely impacted by: (1) copper and cyanide, and to a
    lesser degree, 4-methylphenol cobalt, lead, nickel, vanadium, and zinc in surface water of the
    intermittent stream; and (2) cadmium and cyanide, and to a lesser degree, bis(2-ethylhexyl)phthalate,
    pyrene, nickel and zinc in sediment of the intermittent stream and possibly Kishwaukee River
    sediments. These effects are likely to include mortality, reproductive effects, and growth effects for
    sensitive species.

    Terrestrial plants may be at risk from:  (1) direct contact with drainage channel surface soil due to
    elevated (phytotoxic) concentrations of cadmium, lead, vanadium, and to a lesser extent, nickel  and
    zinc; (2) direct contact with leachate surface soils due to elevated (phytotoxic) concentrations of
    vanadium and zinc, and to a lesser extent, cadmium, lead and nickel; and (3) direct contact with onsite
    and offsite surface  soils due to elevated (phytotoxic) concentrations  of vanadiumand zinc, and to a
    lesser extent, cadmium, lead, and nickel. These effects are likely to include reduced growth,
    germination, or reproductive success.

    Terrestrial soil-dwelling animals (e.g., soil invertebrates, reptiles, small burrowing mammals,  songbirds,
    and carnivorous birds and mammals) are expected to be at low risk from exposure to surface soil in
    the drainage channels, leachate areas, offsite and onsite. Risks are location-dependent and influenced
    by variables  such as diet, season, foraging area, and mobility of consumers, and by the level of
    contamination in surface soil and food items. Ecologically significant exposure through ingestion of
    contaminated food  items is considered to be unlikely because the primary COCs in surface soil  do not
    bioaccumulate to a great degree.
                                                45

-------
                                            Summary of Chemical Properties for Final Chemicals of Concern (COCs)
   Chemical or Class of
        Chemical
             Bioaccumulation Potential
        Bioavailabilitly and Toxicity
           Environmenta Persistence
Polychlorinated Biphenyls
(PCBs)
Variable, but most highly chlorinated PCBs (e.g., Aroclor
1254,1260) accumulate to a very high degree in
biological tissues. Primarily stored in fatty tissues of
animals. Terrestrial plants take up less chlorinated PCBs
more rapidly than highly chlorinated PCBs (Eisler, 1986)
For aquatic biota, low solubility decreases
bioavailability andtoxicity of highly chlorinated
PCBs.
Persistence increases with chlorination. Highly
chlorinated PCBs very resistant to bacterial
degradation and are very persistent in the
environment
Polycyclic Aromatic
Hydrocarbons (PAHs)
Variable, but most animals and microorganisms can
metabolize PAHs to products that ultimately experience
complete degradation (Eisler 1987). Rapid uptake and
rapid metabolism/elimination is expected in most cases.
Toxicity increases with molecular weight (MW)
in most cases. Low solubility decreases
bioavailability of high MW PAHs.
Bioavailability in sediments is generally low.
Some PAHs are carcinogenic to mammals.
Generally persistent. Primarily degraded by
photolysis and microbial degradation. Degradation
slow in sediments that are anoxic with little light
penetration.
Pesticides/Herbicides
Variable but many, especially chlorinated hydrocarbons
(e.g., aldrin, dieldrin) accumulate to a very high degree in
biological tissues. Organochlorine compounds (e.g.,
chlordane) are readily taken up but more easily
metabolized. Most are stored in fatty tissues of animals.
Most highly toxic an readily bioavailable to
aquatic and terrestrial biota.
Most chlorinated hydrocarbons are persistent in the
environment because they are resistant to
degradation. Organochlorines such as chlordane are
generally short-lived in water but may persist in
soils.
Volatile Organic Compounds
Low bioaccumulation potential.
Generally low toxicity. Several are common
laboratory contaminants. Detections in surface
medial should be viewed with caution due to
expected volatilization and rapid degradation.
Not persistent. Easily degraded.
Inorganics
Highly variable. Mercury only metal that is expected to
bioaccumulate to a high degree. Others, such as copper
and zinc, can accumulate to a moderate degree in aquatic
biota. Terrestrial biota less likely to accumulate most
metals. No reported bioaccumulation for cyanide.
Variable toxicity. Mercury and cadmium highly
toxic. Copper, silver, zinc and several others
moderately to highly toxic, depending on
receptor. Bioavailability in aquatic systems
decreased with increasing water hardness and
dissolved organic carbon. Acid volatile sulfides
mitigate toxicity in sediments for some metals.
Cyanide highly acutely toxic—rapid degradation
minimized chronic toxicity potential.
Metals highly persistent, not degraded. Cyanide not
persistent in surface water but may persist in
groundwater (Eisler 1991).
                                                                                       46

-------
Basis for Action

The response action selected in this Record of Decision is necessary to protect the public health or
welfare or the environment from actual or threatened releases of pollutants or contaminants or hazardous
substances from this Site into the environment and which may present an imminent and substantial
endangerment to public health or welfare and/or the environment.
VIII. Remedial Action Objectives

To address the problems identified in the RI and the remedial response actions needed for each Superfund
site, the remedial action objectives must be identified first. The remedial response objectives for the
MIG/DeWane Landfill Site are based on the exposure levels and risks associated with contamination from
the landfill and the leachate surface impoundment. The remedial response objectives consider:

•      Site Characteristics that delineate the fate and transport of contaminants and pathways of
       exposure;

•      Human and environmental receptors; and

•      The associated short-term and long-term human health and environmental effects.

To meet these broad goals, more focused remedial actions objectives must be identified and then the
various possible remedial actions to meet these objectives must be evaluated, as occurred in the FS.

The remedial  action objectives identify the problems associated with the site such as: site-specific
chemicals of concern, media of concern, potential exposure pathways, and remediation goals. The
remedial  action objectives are based on the RI and baseline risk assessment results, as well as the
appropriate state and federal environmental regulations. The remedial action objectives will be achieved
through specific remedial response actions. Further details on the remedial action objectives are included
in the FS document.

The following remedial action objectives, based on the findings of the RI, have been identified for the
MIG/DeWane Landfill Site:

•      Mitigate potential human and ecological risks associated with leachate seeps, including leachate
       waters, sediments, and corresponding offsite precipitation

•      Mitigate potential human exposure risks  associated with the surface  impoundment liquids and
       sediments.
                                              47

-------
•       Minimize the impacts of precipitation runoff on the surface water and sediment quality of the
        drainage channels and intermittent stream.

•       Minimize leachate migration potential to groundwater.

•       Mitigate potential human risk associated with the offsite migration of landfill gas towards
        residential homes west of the landfill.

•       Restrict future development on the landfill, as well as in the soil borrow pit west of the landfill.

•       Groundwater will be returned to drinking water quality through landfill containment/control
        measures and natural attenuation, and will comply with water quality criteria for Class I aquifers
        established under Illinois 35 IAC Part 620 (Groundwater Standards).

•       Address potential future impacts to surface water from migration of contaminated groundwater.

•       Address potential ecological risks associated with leachate seeps runoff to the intermittent stream,
        drainage channels to the north, and the Kishwaukee River.

The remedial action objectives, as indicated immediately above, will result in response actions that provide
for waste containment, leachate generation reduction, reduction and control of landfill gas, and the
minimization of contaminant migration to groundwater and surface waters through landfill capping. The
necessary response actions were considered through the development of various remedial alternatives.
The response actions and aspects of the remedial alternatives are included below.

Landfill Source Waste Containment

The landfill capping/containment remedial response action will address the remedial action objectives
associated with both prevention of direct contact with refuse and control of leachate. In addition, any
leachate contaminated surface soils, as well as contaminated surface impoundment sediments will be
placed under the cap. Capping reduces the migration of leachate constituent from the buried waste to
groundwater, surface water, and air resulting from leachate surface seeps or downward percolation. It is
an effective containment technology that prevents direct human contact and reduces surface infiltration
and the volume of corresponding leachate generation. Leachate seep sediment will be covered/capped as
part of the final remedy. Surface water runoff controls to enhance capping integrity and minimize
potential refuse and seep contact with precipitation will also be implement as part of the landfill capping.
                                               48

-------
The Illinois EPA is recommending a multi-component cap system composed of a vegetative layer, a soil
protective layer, drainage layer, and a geosynthetic clay cover with a geomembrane be installed over the
entire landfill landfill. The engineering specifications for the selected material will be based on U.S. EPA
guidance.

Leachate Removal

The leachate seeps that were historically observed coming from the landfill have been significantly reduce
by the placement of the interim cap during the Interim Response Measures activities in the early 1990s.
However the interim cap was only a partial cap that does not meet the requirements of Part 811 of 35
Illinois Administrative Code for landfill cover systems. Observed leachate seep conditions are believed to
be a result of the localized accumulation of leachate in combination with an inadequate depth of soil
cover. It is believed that the installation of an adequate cap system over the landfill would prevent the
future accumulation of leachate (i.e., the permeability of the landfill base would be greater than the cap),
which would result in the gradual dissipation of the current leachate accumulation and mitigate long-term
seep problems.

The planned active leachate removal scenario includes continued operation of the existing system located
within the eastern portion of the landfill, in combination with the construction of a complementary drainage
system within the major seep areas along the western portion of the landfill. The existing leachate removal
system would continue to be operated as is within the eastern portion of the Landfill. A leachate holding
tank system would have to be installed as a replacement for the closure of the surface impoundment.

Landfill Gas Generation and Migration

The remedial action objectives will also result in remedial response actions that will reduce and intercept
gas mitigation from the landfill. According to the baseline risk assessment, landfill gas migration poses an
exposure concern for the future residents scenario if residential homes are constructed in the IRM soil
borrow pit area west of the landfill, and possibly pose a risk of chronic exposure to homes built near the
borrow pit. Horizontal landfill gas migration away from the landfill is also believed to have contributed to
the low-level groundwater impacts to the west, northwest of the landfill. The gas extraction remedial
alternatives include passive and active venting systems.

Offsite landfill gas migration to the west was identified as a migration pathway of concern in the baseline
risk assessment in the event future residential development occurs within the IRM borrow pit area to the
west (not feasible given the current deed restriction). Since residential homes located further west of the
IRM borrow pit area may still represent a potential exposure pathway of concern, a landfill perimeter gas
monitoring system (proximate to and/or outside of the landfill perimeter fence) was installed along the
western boundary of the refuse burial. The
                                               49

-------
monitoring system was installed in order to provide additional data to evaluate the extent of offsite gas
migration. Presently, the monitoring system is being used to assess the effectiveness of the collection
system in the active mode at controlling landfill gas migration to the west. It will continue to provide
effectiveness information during the Remedial Action ("RA") phase.

Passive gas venting systems are specifically designed to collect and direct the subsurface movement of
landfill gases using vertical pipe vents or trenches. Passive venting systems can be installed either within
the interior or around the perimeter of a landfill. Individual pipe vents are limited in their area of influence,
but can be an effective and inexpensive means of reducing localized landfill gas pressures within and
around the  perimeter of a landfill when installed as a system of multiple vents. Trench collection vents  are
typically  more effective in controlling the lateral movement of landfill gas if keyed into low permeability
materials or extended to the water table. Both vertical wells and a trench, or a combination, can be
applied for venting in the vicinity of the landfill site. Passive gas vents to be installed within the landfill can
be upgraded to active gas extraction.

The baseline risk assessment defines the potential future residential  exposure scenario associated with
landfill gas migration to the west. Landfill gas sampling near and in the subdivision during early 1999
determined that methane gas posed a possible hazard of flammability in some homes. To address this
problem, an active gas collection trench was installed along the western boundary of the landfill. The
trench was constructed down to near the water table and intersected the permeable vadose zone sand
seams that have been identified as extending to the west of the landfill site. The permeable vadose zone
sand seams represent the expected pathway of landfill gas migration (i.e., conceptual model for the Site).
As previously mentioned, the function of the active gas collection trench is to intercept the pathway of
offsite landfill gas migration to the west towards the residential homes.

In addition to the gas collection/interceptor trench, six vertical gas extraction were installed near the
eastern boundary of the subdivision and the western boundary of the borrow pit.  These gas extraction
wells are being used to remove landfill gas from underneath the subdivision.

The two  mechanisms for offsite migration include convection and diffusion. Gas flow due to convection
(i.e.. based on subsurface pressure gradients) represents the primary mechanism  for offsite gas migration.
Diffusion migration, which results from the movement of gases from areas of higher to lower
concentrations (i.e., based on subsurface concentration gradients) is limited in the distance that it will
propagate. Horizontal gas migration due to diffusion is typically limited to less than 100 feet.

Groundwater Remediation via Monitored Natural Attenuation

Groundwater has not been identified in either the RI or the baseline risk assessment as a media of
concern from a human or ecological exposure perspective for purposes of screening general response
actions and corresponding remedial technologies. Low levels of various leachate
                                                50

-------
constituents were measured in groundwater downgradient of the landfill. A small number of VOCs
(primarily vinyl chloride and benzene), inorganic compounds (primarily iron and manganese), and total
chlorides are in marginal exceedence of their respective Illinois Class I groundwater quality criteria.
Although groundwater was not identified as a media of concern, this ROD requires a reassessment of the
risk of VOCs in groundwater and the possible volitalization of VOCs into residential basements.

It should also be noted that alternative groundwater pump and treat or containment approaches, the other
general response actions that can be considered for offsite groundwater, would not be any more effective
as monitored natural attenuation for the site. It is well documented that pump and treat approaches are not
effective at meeting groundwater ARARs or achieving full aquifer restoration that involve meeting
cleanup criteria in the low ppb range.  In addition, there is ultimately a mass transfer barrier (e.g.,
desorption) that limits the final groundwater concentrations that can be achieved either by natural aquifer
flushing or pump and treat.

U.S. EPA guidance document titled Presumptive Response Strategy and Ex-Situ Treatment
Technologies for Contaminated Groundwater at CERCLA Sites (1996) identifies monitored natural
attenuation as a viable remedy for groundwater, if sufficient information exists that natural processes can
achieve the remediation  objectives with the implementation of adequate source control measures,
monitoring and institutional controls. A more recent U.S. EPA document Use of Monitored Natural
Attenuation at Superfund, RCRA Corrective Action, and Underground Storage Tank Sites (1997)
identifies monitored natural attenuation as a viable approach for lower concentration groundwater impact
conditions, and in instances where the remediation time frame to achieve groundwater ARARs would be
comparable to existing pump and treat or in-situ treatment technologies.

The groundwater contaminant plume will be addressed using a monitored natural attenuation approach.
Source control (i.e., landfill capping) and performance monitoring are fundamental  components of any
monitored natural attenuation remedy. A network of groundwater monitoring  wells will be sampled on a
regular schedule to determine the effectiveness of natural attenuation.

The term "monitored natural attenuation" refers to the  reliance on natural attenuation processes (within
the context of a carefully controlled and monitored site cleanup approach) to  achieve site specific
remedial objectives within a time frame that is reasonable compared to that offered by other more active
methods. The "natural attenuation processes" that are at work in such a remediation approach include
physical, chemical, or biological processes that, under favorable conditions, act without human intervention
to reduce the mass, toxicity, mobility,  volume, or concentration of contaminants in soil or groundwater.
Natural attenuation processes may reduce the potential risk posed by site contaminants in three ways:

1.  The contaminant may be converted to a less toxic  form through destructive processes such as
    biodegradation or abiotic transformations;
                                               51

-------
2.  Potential exposure levels may be reduced by lowering of concentration levels (through the destructive
    processes, or by dilution or dispersion); and

3.  Contaminant mobility and bioavailability may be reduced by sorption to the soil or rock matrix.

Natural attenuation is being provided in a complementary manner at the site by the combination of the
interior landfill environment and the lower permeability glacial till zone present beneath the refuse burial,
as well as the higher permeability of the Interface Hydrostratigraphic Unit. This is evidenced by the much
lower concentrations of VOCs and chlorides measured in groundwater at the site, versus what was
measured in the leachate well samples and what can be considered typical for uncontrolled municipal
landfills. Primary natural attenuation mechanisms include the following: adsorption to natural organic
carbon content in the unsaturated zone glacial till soils; biodegradation in the vapor and adsorbed soil
phases in the unsaturated zone and dissolved aqueous phase in the saturated zone; dispersion of the
dissolved phase in the saturated zone; and immobilization/precipitation of metals present in the dissolved
phase in the saturated zone resulting from changes in subsurface oxidation/reduction valence states as
constituents migrate away from the presence and influence of landfill leachate. Given the existence of
monitoring well data from the landfill interior to the Kishwaukee River, the ultimate groundwater receptor,
the RI data demonstrate the magnitude of the natural attenuation process.

The RI data support the following conceptual model for the site and what is commonly known about
landfill fate and transport mechanisms:

 !   The fine-grained, low permeability materials underlying the landfill  are believed to be impeding the
    migration of leachate constituents of the Interface and Galena-Platteville Hydrostratigraphic Units. A
    large portion of the refuse burial occurred above grade and, therefore, neither the refuse nor
    corresponding leachate is in direct contact with groundwater.  Approximately 10 to 25 feet of lower
    permeability till exist between the base of the landfill and the Interface Hydrostratigraphic Unit. The
    hydraulic conductivity of the till unit, based on laboratory testing of soil samples collected from natural
    till soils analogous to what is present at the base of the landfill, is on the order of 10~6 to  10~7 cm/sec.

 !   The leachate versus monitoring well data demonstrate that downward leachate migration through the
    till base soils of the landfill is being impeded and natural attenuation is occurring. Natural attenuation
    mechanisms (e.g., retardation, adsorption, biological degradation) known to be associated with landfill
    environments (i.e., interior boundaries of refuse burial) and the low permeability till soils beneath the
    refuse burial are responsible for minimizing the groundwater impacts immediately downgradient of the
    landfill.

 !   The downgradient monitoring well data (total chlorides, in particular, which are not subject to any
    degradation mechanisms) demonstrate the complementary natural attenuation capacity of the shallow
    groundwater zones as migration of groundwater leachate constituents occurs
                                                52

-------
   away from the landfill and towards the Kishwaukee River. The primary natural attenuation
   mechanisms associated with the shallow groundwater zones appear to be dilution, dispersion, and
   metals precipitation into the native soil matrix.

!   The low-level constituents in groundwater have not adversely impacted the water or sediment quality
   of the Kishwaukee River.

!   The following RI findings and conclusions support the conclusion that the site conditions are providing
   a significant level of natural attenuation capacity and are capable of limiting leachate constituent
   migration even, possibly,  in the absence of additional landfill control measures:

!   The reduction in total chloride concentration between the leachate and groundwater demonstrates the
   natural attenuation mechanism provided by the dilution and dispersion mechanisms of groundwater
   flow. Average total chloride concentrations decreased from approximately 4,000 mg/L in the leachate
   to between 160 and 640 mg/L in groundwater around the perimeter of the landfill and 25 to 200 mg/L
   in downgradient groundwater.

!   The primary leachate constituents (e.g., various ketones, aromatic hydrocarbons,  and phenols) are
   virtually absent in the offsite groundwater samples. Most of these compound are considered  relatively
   soluble and mobile in groundwater and, thus, are not typically as prone to subsurface
   retardation/attenuation mechanisms.  The virtual absence of these compounds in offsite  monitoring
   well samples mean downward leachate migration is being impeded, and/or these compounds are being
   naturally biodegraded or dispersed within  the unsaturated or saturated zones beneath the landfill prior
   to migrating offsite. Biodegradation  of ketones and phenols, principal leachate constituents, is a natural
   attenuation mechanism within the  landfill  interior and the base till soils beneath the refuse burial, based
   on their known  susceptibility to aerobic biological degradation (and possibly anaerobic biological
   degradation).

!   Mobile organic leachate constituents concentrations in groundwater are low in comparison to
   corresponding concentrations measured in leachate samples, an indicator that natural attenuation is
   occurring for these compounds. Only the most mobile and persistent of the organic leachate
   constituents (e.g., vinyl chloride and benzene) were found at low ppb concentrations in groundwater.
   At a minimum,  the natural attenuation of these compounds in occurring by the dilution and dispersion
   mechanisms.  A level of retardation also likely occurs within the till base soils beneath the refuse
   burial. The presence of VOCs constituents in groundwater could also be a result of horizontal landfill
   gas migration, as opposed to vertical leachate percolation, or a combination of both.

!   Natural precipitation of metals present in the leachate (e.g., iron and manganese)  back  into the native
   soil matrix, due to a shift  from an anaerobic environment inside of the landfill to an oxidized state
   away from the influence of the refuse burial, is a natural attenuation
                                               53

-------
    mechanism between the landfill interior and perimeter groundwater monitoring wells. Inorganic metals
    appear to be returning to near natural background levels prior to reaching the Kishwaukee River.

 !   The low concentrations of daughter products cis-l,2-dichlorothene and vinyl chloride in offsite
    monitoring wells, versus the relative absence of the parent compounds trichloroethene and
    tetrachloroethene, suggests these leachate constituents compounds are being biodegraded via a
    reductive dehalogenation mechanism within the landfill interior, probably within the base soils beneath
    the refuse burial, and possibly within the Glacial Drift and Interface Hlydrostratigraphic units.

The time frame required for monitored natural attenuation to reach Illinois Class I groundwater quality
criteria or the cleanup objective for the groundwater migrating to the west-northwest of the landfill
through the West Glacial Pathway is estimated to range from 13 to 26 years. This time frame is the same
if various additional contingent leachate removal scenarios are implemented. The time frame required for
natural attenuation to reach Class I groundwater criteria or the cleanup objectives for the groundwater
migrating north of the landfill through the North Interface Pathway under the planned leachate removal
scenario and natural attenuation is from 81 to 108 years. When this approach is combined with the
contingent leachate removal scenario, the time frame is estimated to range from 54 to 81 years. The
difference between the two leachate removal/natural attenuation remediation scenarios meets the criteria
of U.S. EPA guidance document on monitored natural attenuation.

As stated earlier in this document, institutional controls are already in place  to restrict the use of offsite
groundwater by current residential homes to the west of the Landfill. Consequently, water supply wells
have not been, and will not be, installed within the residential area to the west, thus removing offsite
groundwater as a current human exposure pathway. Per the Boone County  Health Department, a permit
to install a water-well will not be issued if municipal water is provided by the city.

The groundwater at the site and groundwater in the areas immediately adjacent to the site are not used as
a drinking water source. Private drinking wells do exist north of the Kishwaukee River, but groundwater
flow north of the river is south towards the river.

The human health risks are effectively addressed by the remediation goals, some of which are now
presently being addressed through the landfill gas extraction and interception system. The capping of the
landfill will effectively reduce groundwater infiltration through the landfill waste, thus reducing the
generation of landfill leachate and gas. The landfill gas is presently being remediated as mentioned above.
The landfill cap and a leachate collection system will result in dramatically reduced contamination to
groundwater by contaminants such as VOCs. Contaminants presently  in the groundwater and soil are
apparently undergoing natural attenuation or intrinsic remediation due to the  composition and chemistry of
the soil.
                                               54

-------
IX. Description-of Alternatives
The general response actions that were developed for the MIG/DeWane Site were developed to address
the various media of concern and the remedial action objectives. The details of how the response actions
were developed are included in the FS document. Both the media of concern and the remedial action
objectives that were developed and included in the FS are based on the results of the RI and the baseline
risk assessment. For all remedial alternatives, the state and federal regulations and ARARs will be
complied with and the appropriate U.S. EPA guidance will be followed.

The site area and media (i.e., soil, groundwater) to be addressed by the remedial actions at the
MIG/DeWane Landfill include the following:

1.  The landfill, which is approximately 47 acres in size, measuring approximately 50 to 55 feet in height,
   containing an estimated 3,715,200 cubic yards of waste, with an indeterminate volume of leachate and
   landfill generated gas; and
2.  The leachate surface impoundment, which measures approximately 130 feet wide by 130 feet long by
    10 feet deep.

The media to  be addressed include leachate, landfill gas (methane), groundwater, and leachate soil
sediments. In  addition, VOCs that may volatilize from the groundwater must be remediated from under
the western soil borrow pit. The soil borrow pit is approximately 19 acres in size. The landfill cap,
leachate removal, and gas extractions system should reduce the VOC migration to groundwater.

The general response action categories to be addressed are included below and are addressed by the
various possible remedial alternatives. It is remedial alternative 4A that is believed to provide for the best
over all set of response actions for the following:

•      Groundwater

•      Buried Refuse/Surface Soils

       Landfill Gas

•      Leachate

Capping Alternatives

The capping remedy
                                               55

-------
There are five (5) main capping remedial alternatives that are included in the FS document. In addition,
two of the five main alternatives have sub-alternatives. The Illinois EPA has proposed a 6th capping
alternative, designated as Alternative 4A. Alternative 4A is different from Alternative 4 in that it requires
that more soil be used in the landfill cap, but not as much soil as proposed by Alternative 5.

Alternative 4 does not meet the Illinois EPA Applicable or Relevant and Appropriate Requirements
("ARARs") for and adequate depth of cover soil. Alternative 5 does meet ARARs but
construction/engineering problems apparently  do not make this alternative possible. Alternative 4A is a
comprise design between the alternatives.

Except for Alternative 1, the remedial alternatives all include additional landfill capping requirements. The
landfill cap alternatives are different from each other. Alternative 1, the No Action Alternative, is a
baseline for comparison to other alternatives.  SARA mandates the inclusion of the No Action alternative.

The following capping options have been developed and are presented by their respective remedial
alternative designations:

 !   Alternative 1  - Alternative 1 represents no additional action, beyond the  previous interim remedial
    measures of 1992/3. The no additional action alternative will be used as  a basis for evaluating
    remedial alternatives against the results of the Baseline Risk Assessment.

 !   Alternatives 2A and 2B - Alternative 2A would leave the interim remedial  measures cap in place and
    construct an analogous 2-foot compacted  clay cap over the side slopes of the landfill. An optional
    drainage layer could also be installed. Alternative 2B includes all of 2A,  plus the addition of a 3-foot
    protective soil layer over the compacted clay layer.

 !   Alternative 3A and 3B  - Alternative 3A involves the installation of a geosynthetic clay cap (GCL)
    over the landfill crest to further reduce precipitation infiltration and protect the older interim response
    measures cap, and 2 feet of compacted soil on the landfill side slopes, with  an optional drainage layer.
    Alternative 3B includes all of 3A, plus the addition of a 3-foot protective soil layer over the GCL.

 !   Alternative 4  - Alternative 4 involves the installation of a grading layer of no specific depth, over the
    landfill side slopes, a GCL cap over the entire landfill, a drainage layer over the entire landfill, and 1
    !^-foot protective soil layer over the GCL and drainage layer.

 !   Alternative 4A - Alternative 4A is an option not included in the FS, but an option proposed by the
    Illinois EPA.  This option includes all of Alternative 4, but requires the grading layer to be of a
    minimum depth of l-VA feet and the final protective soil layer to be 30 inches  on the crest of the
    landfill and top of the landfill side slopes, with a minimum of 2 feet of
                                                56

-------
    protective soil layer at the bottom of the side slopes.

 !   Alternative 5 - Alternative 5 includes all of Alternative 4, but instead of a 1 1A -foot protective soil
    layer, it includes a 3-foot protective soil layer.
Common Non-Cap Components of Remedial Alternatives 2-5

The Superfund program requires that the "no-action" alternative be evaluated at every site to establish a
baseline for comparison. Under this alternative the Illinois EPA and USEPA would take no further action
at the site to prevent exposure to the soil and ground-water contamination. This alternative is applicable to
each of the media addressed by the RI/FS.

The common, non-cap, components for Alternatives 2-5 include the following:

•      Institutional controls for the Landfill and the Soil Borrow Pit area, west of the landfill. Institutional
       controls such as zoning restrictions, deed restrictions, and public health regulations restrict
       development in these areas and not allow for the installation of drinking water wells.

•      Removal of all leachate surface impoundment liquids and sediments.

•      Natural attenuation/intrinsic remediation of groundwater and institutional controls to meet Illinois
       and Federal groundwater and surface water regulations.

•      Leachate collection system to minimize leachate flow to groundwater.

•      Offsite leachate treatment and disposal.

•      Landfill gas collection system.

•      Leachate and landfill gas monitoring.

•      Long-term groundwater monitoring.

•      Construction of a landfill surface water diversion system.
Summary of Non-Cap Components Common to Alternatives 2-5
NOTE:  Additional specific details of the Common Non-Cap Components for Remedial Alternatives were
included above in the Remedial Action Objective section. Details for the the Remedial Alternatives were
included above in an attempt to explain how the Remedial Action
                                               57

-------
Objectives will be met by implementing the Remedial Alternatives.

Construction and operation of a leachate collection and monitoring system:  Because leachate
has been migrating to and contaminating groundwater and a contaminant plume was detected moving
towards the Kishwaukee River, an enhanced leachate collection system will be installed. The leachate
collection system will be  composed of the present gravity controlled leachate collection system and a few
collection trenches located on the landfill in the area of major leachate seeps. The gravity controlled
leachate collection system located in the eastern third of the landfill was installed during the original
construction of the landfill. The enhanced leachate collection system will mitigate leachate surface
leachate seeps, reduce hydrostatic pressure within the landfill, and reduce leachate contamination into
groundwater. A localized leachate gravity collection and drainage system will use a system of either
permeable bed layers, or  passive trenches, and if necessary vertical wells, for the major leachate seep
areas.

In general the major seep areas are located on the north and northwestern slopes of the landfill. To
intersect major leachate flow areas, passive collection trenches and/or a permeable bed layer consisting
of perforated pipe surrounded by highly permeable coarse stone aggregate will be installed across the
face of the major leachate seep areas. Also, interior vertical leachate extraction wells  used to mitigate the
future occurrence of seeps, will be installed in areas where there is a need based on the internal
hydrostatic pressure measurements and engineering determinations.

The vertical leachate collection wells will be operated under gravity or artesian conditions for a period of
time necessary to reduce localized leachate head buildups to sufficient levels that minimize and stop the
seeps. If, however, leachate must be removed in a shorter time frame than can be achieved by gravity
operation to mitigate future seeps, or active interior leachate extraction must be implemented as a
contingent remedial action measure to address groundwater contamination, surface water (Kishwaukee
River)  regulations or other ARARs, then vertical leachate extraction wells will be fitted with submersible
pumps to perform active extraction for a limited  duration until the remedial objectives  are met. The
conditions that would result in the additional enhancement of the leachate collection system are those that
would  result in a sustained increase in groundwater contamination, or those that indicate no decrease in
groundwater contamination over a specific time interval. The collected leachate will be treated onsite or
transported offsite for treatment and disposal. Also, there are additional possible contingent leachate
removal options identified in  the FS. These options include the following:

•   A perimeter trench system can be constructed along key lengths proximate to identified areas of
    leachate accumulation;
•   Horizontal well laterals can be installed along the base of the western portion of the refuse burial
    area;
•   Passive gas vent wells located in identified areas of leachate accumulation can be retrofitted to
    operate as leachate extraction wells; and
•   Any combination of the three leachate removal alternatives described above can be
                                                58

-------
    implemented if the combination is more cost effective than implementing each of alternatives
    separately.

The additional leachate removal options would be used if either of the following scenarios occurred:  (1)
design analysis based on the pre-design leachate monitoring data indicates that leachate removal must be
accomplished in a shorter time frame to mitigate the seep conditions; or (2) in the event that the
corresponding trigger mechanism criteria described below in the Groundwater Monitoring Plan part of this
section are exceeded.

The extent of passive leachate collection trenches, permeable interceptor beds, or other contingent
leachate removal components as described in the FS will be established as part of the remedial design
using additional data obtained during pre-design sampling investigation and study. An engineering
evaluation of future seep potential and a leachate head drawdown analysis will occur. The extent of these
leachate removal component of the remedial action will be sufficient to collect and convey leachate that
flows to the trench, bed, or other leachate management component, mitigate seep potential, dissipate high
leachate heads, and work effectively with the cap to meet the remedial action objectives.

The contingent leachate removal  scenarios  are provided as a contingent response measure that may be
performed, based on an exceedance of trigger mechanism criteria. These contingent leachate removal
scenarios, if triggered, would continue until piezometer data indicate internal hydrostatic pressures have
been sufficiently  relieved to either prevent future leachate seep problems or prevent continued migration
of leachate constituents to groundwater, with a corresponding reduction in groundwater and soil gas
contaminants being observed.

Construction and operation of an active and passive perimeter landfill gas collection,  treatment
and monitoring program: The  landfill gas and treatment collection system will reduce interior landfill
pressures which serve as a driving force for gas migration. This system will protect residential  homes
west of the landfill from potential uncontrolled offsite gas migration, as well as reduce landfill gas pressure
within the interior of the landfill, thus protecting the integrity of the landfill cap.

The gas  collection system will include a combination of passive vents in the landfill interior and include a
gas collection trench along the western edge of the refuse burial boundary. If necessary the passive gas
vent wells can become active vents. The western-perimeter gas collection system will initially  be operated
in an active mode, as is necessary. The gas extraction trench and  gas extraction wells have been installed.
Gas vapor probes have been installed to monitor gas migration, especially to the area west of the landfill.

Leachate surface impoundment closure:  All surface impoundment liquids and a minimum of two feet
of sediments will be removed, as  was  determined to be necessary  by the RI sampling. The impoundment
liquids will be treated and disposed of offsite. The contaminated sediments will be excavated and
consolidated beneath the landfill cap. The surface impoundment will then
                                               59

-------
be filled with clean soil.

Surface water diversion system: A surface water diversion system will be installed along the landfill
side slopes. This system will include drainage ditches around portions of the toe of the landfill, where
feasible, and corresponding discharge lines/routing. Erosion control measures, and structures will be
implemented where necessary.

Implementation of access restrictions and institutional controls:  Institutional controls such its site
security fences, zoning restrictions, deed restrictions, and adherence to local ordinances restricting
groundwater use will be used to restrict access to the site and contaminated groundwater. Institutional
controls including no development on the landfill site, or in the soil borrow pit west of and adjacent landfill
will be implemented.

The areas to the north and northwest of the landfill will be designated as a Groundwater Management
Zone ("GMZ"). A GMZ is a three dimensional region in which the groundwater must be managed to
mitigate impairment caused by the release of contaminants from a site. Groundwater management to
mitigate impairment can use various combinations of technology. The groundwater management measures
need to be direct measures that contain and remediate groundwater. 35 IAC Code 620.250 allows for the
establishment of GMZs within any class of groundwater.

The agricultural field north of the landfill and railroad tracks is located within the Kishwaukee River flood
plain. Residential development is restricted and drinking water wells can not be installed. The local/county
zoning ordinances and Boone  County Health Department regulations can also be used to restrict
groundwater drinking well installation. The IRM soil borrow pit property has development deed
restrictions.

Natural attenuation/intrinsic remediation of groundwater:  To remediate groundwater
contamination and insure  compliance with Illinois EPA and U.S. EPA groundwater and surface water
regulations, numerous remediation components will be implemented. These components include, capping
the landfill, reducing gas pressure within the landfill, the removal of leachate, and natural attenuation
through the establishment of a GMZ north, northwest of the landfill. The establishment of a GMZ will
allow for the natural attenuation of the contaminated groundwater by  the natural organic content of
groundwater as it flows through the GMZ towards the Kishwaukee River. The natural attenuation occurs
when a variety of physical, chemical, or biological processes occur within the soil and groundwater to
reduce the mass, toxicity, mobility, volume or concentration of contaminants in the soil or groundwater.

Natural attenuation is being provided at the Site by the combination of the interior Landfill environment
and the lower permeability glacial till zone present beneath the refuse burial, as well as the higher
permeability of the Interface Hydrostratigraphic Unit. This is  evidenced by the much lower concentrations
of VOCs and chlorides measured in groundwater at the Site,  versus what was measured in the leachate
well samples and what can be  considered typical for
                                               60

-------
uncontrolled municipal landfills (USEPA, 1987b). Primary natural attenuation mechanisms include the
following: adsorption to natural organic carbon content in the unsaturated zone glacial till soils;
biodegradation in the vapor and adsorbed soil phases in the unsaturated zone and dissolved aqueous phase
in the saturated zone; dispersion of the dissolved phase in the saturated zone; and
immobilization/precipitation of metals present in the dissolved phase in the saturated zone resulting from
changes in subsurface oxidation/reduction valence states as constituents migrate away from the presence
and influence of landfill leachate. Given the existence of monitoring well data from the Landfill interior to
the Kishwaukee River, the ultimate groundwater receptor, the RI data demonstrate the magnitude of the
natural attenuation process.

To insure that effective natural attenuation occurs, source control (i.e., landfill capping, leachate surface
impoundment leachate and sediment removal) and long-term performance monitoring of the groundwater
will be performed. In addition, contingency measures requiring that additional remediation technologies be
implemented are incorporated into the remediation process, in case natural attenuation and landfill capping
do not result in the remediation objectives being met. For MIG/DeWane, the contingency plan will include
an additional leachate withdrawal measure triggered by the exceedence of Groundwater Action Levels
included in the Groundwater Monitoring Program part. The contingency plan includes the implementation
of one or all of the following:  (1) a landfill perimeter trench leachate extraction system, (2) horizontal
leachate withdraw wells along the landfill perimeter, and (3) vertical leachate extraction wells within the
landfill interior.

Groundwater Action Levels, Target Compounds for Natural Attenuation, and Contingent
Leachate Removal:  As was stated above in the Baseline Risk Assessment Section, groundwater
action levels have been established to trigger a contingency plan for additional leachate removal, if natural
attenuation is not effectively occurring. Sampling results from monitoring wells located immediately
downgradient of the landfill perimeter will serve as the basis for determining the exceedence of an action
level for purposes of triggering the contingent leachate removal plan. Groundwater action levels  are
specific levels of contaminant concentrations for specific contaminant target compounds. The target
compound action levels have been designated as triggers for additional remediation if the action levels are
met or exceeded, as  determined by groundwater monitoring (see Long-term Groundwater Monitoring
below for more details).

The initial groundwater action levels have been established to be protective of surface water, mainly to
protect the Kishwaukee River. The baseline risk assessment did not find the groundwater media to
represent a completed pathway for contaminants because the groundwater use is restricted. VOCs in
groundwater, however, may constitute a potential risk component due to volatilization. An addendum to
the baseline risk assessment is being developed to re-examine the VOCs as a potential risk component.
Results from the  addendum to the baseline risk assessment will be taken into consideration during the
remedial design stage, to insure that the any potential risk is adequately addressed by the remedial
alternatives.
                                               61

-------
The ground-water action levels include a 7 VOC target compounds, and each compound has two different
ground-water action levels. There are separate ground-water action levels for the north ground-water
pathway and for the west pathway. The action levels are based on surface water quality criteria. These
target compounds and their respective action levels are presented in the table below.

                          SURFACE WATER QUALITY CRITERIA
Contaminant
of Concern

Benzene
1 ,1-Dichloroethylene
1 ,2-Dichloropropane
Methylene Chloride
Tetrachloroethylene
Trichloroethylene
Vinyl Chloride
Acute

5.2 mg/L
3.03 mg/L
4.8 mg/L
17 mg/L
1 .2 mg/L
12 mg/L
NCE
Chronic

0.42 mg/L
0.242
mg/L
0.38 mg/L
1 .4 mg/L
0.1 5 mg/L
0.94 mg/L
NCE
Human Health
(Organisms)

"0.071 mg/L
"0.0032 mg/L
"0.039 mg/L
0.34 mg/L
"0.00885 mg/L
"0.081 mg/L
"0.525 mg/L
Max. Detected
West Pathway

0.011 mg/L
<0.001mg/L
0.01 mg/L
0.01 mg/L
0.007 mg/L
0.01 mg/L
0.01 2 mg/L
Action Levels
West Pathway

6.3 mg/L
135 mg/L
0.85 mg/L
13000 mg/L
0.88 mg/L
2.53 mg/L
10.58 mg/L
Max. Detected
North Pathway

0.01 2 mg/L
0.001 mg/L
0.006 mg/L
<0.001 mg/L
0.002 mg/L
0.006 mg/L
0.028 mg/L
Action Level
North Pathway

1 .37 mg/L
2.3 mg/L
0.37 mg/L
10333 mg/L
0.1 8 mg/L
0.91 mg/L
4.77 mg/L
* = Value obtained from the December 22, 1992 Federal Register (Vol. 57, No. 246) pages 60890, 60911, and 60912.

NCE = No Criterion Established

If the concentration level of any of the above target leachate constituents (compounds) meet or exceed
the above listed levels, for two quarterly groundwater sampling events within any 4 consecutive quarters,
then the exceedance will trigger the contingency leachate removal process that requires that alternative
remediation measures be implemented. An evaluation of the situation will determine which elements of
the contingency plan will be implemented. The contingency leachate removal would continue until
groundwater contaminate levels  return to the previous or lower levels.

It should be noted that in addition to the groundwater action levels based on surface water criteria, the
Illinois EPA believes that the use of additional groundwater action levels based on the MCLs for COCs
identified in the RI,  baseline risk assessment, and the baseline risk assessment addendum results should be
considered during any pre-remedial design study, and/or the remedial design stage. This issue has been
raised based on concerns relative to the nearby subdivision and the Class I groundwater requirements.
The groundwater action levels above are based on surface water criteria that are two to six orders of
magnitude greater than the maximum detected levels for the seven listed compounds. It would also appear
that it may  be more  appropriate for additional action levels to be set at the level that would clearly indicate
that the monitored natural attenuation remedy is showing a decrease in contaminant concentration after a
certain period of time. Using these criteria the action levels for the COCs should be closer to the
                                               62

-------
maximum detected levels detected. Any changes to the appropriate target levels will be specified after
completion of the baseline risk assessment addendum. Additionally if a decrease in COC concentrations
are not detected within the specific time frame, then additional leachate withdraw methods should be
instituted.

Contingent leachate removal options identified in the FS include:

•   A perimeter trench system could be constructed along key lengths proximate to identified areas of
    leachate contamination.

•   Horizontal well laterals could be installed along the base of the western portion of the refuse burial.

•   Passive gas vent wells located in identified areas of leachate accumulation could be retrofitted to
    operate as leachate extraction wells.

•   Any combination of the three leachate removal alternatives described above could be implemented if
    the it is more cost effective than each of them separately.

Long-term groundwater monitoring:  The long-term groundwater monitoring program will provide
information on natural attenuation's progress towards achieving the clean-up objectives. The 7 chemicals
of concern to be included in the groundwater monitoring program, as noted immediately above in the
natural attenuation section, include:  benzene: 1,1- Dichloroethylene;  1,2-Dichloropropane; methylene
chloride; tetrachloroethylene; and vinyl chloride. The groundwater monitoring program would determine
the effectiveness of the landfill cap, and the leachate and gas collection systems for the mitigation of
leachate migration from the landfill interior. The plan to initiate additional leachate extraction from the
landfill interior and/or perimeter would be triggered if target groundwater contaminants meet or exceed
the groundwater action levels under the circumstances described above.

Because the extent of groundwater contamination is limited, it is believed that the groundwater cleanup
objectives can be attained through these containment, removal, and natural remediation measures without
directly treating the groundwater, within a time frame that is reasonable as compared to active measures.

The Groundwater Monitoring Program details will be refined during the Remedial Design stage. The
groundwater monitoring program is based on the ARAR requirements of 35 IAC Parts 620 and 811/814.
The objective of the monitoring program would be to assess progress toward the attainment of
groundwater ARARs by monitored natural attainment.

Groundwater monitoring will be performed on a quarterly basis for at least the first 2 years in order to
develop a data base of baseline conditions for comparative purposes and to observe any seasonal
variations that may occur. The first 2 years of sampling and follow years of quarterly
                                               63

-------
sampling will be performed to evaluate monitored natural attenuation progress. Monitoring parameter will
include VOCs, target inorganics, relevant water quality and natural attenuation evaluation parameters, and
other parameters as approved by the Illinois EPA and U.S. EPA. The evaluation or "indicator"
parameters will be monitored in addition to the chemicals of concern.

In general these parameters depend on the attenuation mechanisms that are being relied on to cleanup the
groundwater (see Remediation Objectives section). For reductive dechlorination the indicator parameters
should include dissolved oxygen, nitrate, iron (II), sulfate, methane, oxidation/reduction potential, and
chloride as well as the expected degradation products (e.g., cis-DCE, vinyl chloride, etc.).

As discussed above, baseline groundwater concentrations at each of the monitoring wells would be
determined using sampling results from eight consecutive quarterly monitoring events performed over the
initial 2-year period following completion of the Remedial Action construction activities. The objective of
this initial sampling over a 2-year period would be to gather sufficient level of data to develop a statistical
representation  of baseline groundwater quality and potential variations.  The initial target constituent list for
statistical baseline analysis would include organic and inorganic parameters that exceed Class I
groundwater quality criteria for at least one baseline sampling event. However, as discussed above, the
monitoring parameters from the initial  baseline sampling events would include a more exhaustive list of
organic, inorganic, and water quality and natural attenuation evaluation parameters as proved by the
Illinois EPA and U.S. EPA. The target constituent list can be amended, as appropriate by the Illinois EPA
and U.S. EPA based on continued long-term monitoring program results.

The long-term monitoring groundwater program would focus on the evaluation of monitored natural
attenuation progress towards achieving identified chemical-specific ARARs (i.e.,  Class I groundwater
quality criteria), as well as the effectiveness of the source control measures toward the mitigation of
continued leachate migration from the landfill interior. The source control measures and monitored natural
attenuation would be considered effective if groundwater contaminant levels and leachate levels within
the landfill interior gradually decrease at a predetermined rate without resulting in a further degradation of
overall groundwater quality.

Leachate piezometers would be installed within the interior of the landfill during the Pre-Design phase.
Leachate potentiometric levels would be monitored during this phase to determine the baseline hydraulic
conditions. These piezometers would continue to be monitored  after the implementation of the remedy
(i.e., completion of the landfill cap) to determine the dissipation rate of the accumulated leachate within
the landfill interior. The monitoring frequency and the criteria for evaluating the dissipation rate would be
established as  part of the Remedial Design.

The chosen remedial alternative meet the remedial action objectives by combining active leachate
removal and landfill capping to mitigate the leachate seep conditions and reduce future infiltration into the
landfill. The reduction in infiltration rates would serve to both prevent  the recurrence of future seep
conditions by dissipating the accumulation of leachate levels within the
                                                64

-------
interior of the landfill, as well as enhance the natural attenuation capacity of the site hydrogeology. As
previously mentioned, the current natural attenuation capacity for the landfill has already prevented more
significant impacts to groundwater from occurring. A reduction in future infiltration rates would
accelerate the monitored natural attenuation remediation process for groundwater towards attaining
groundwater chemical-specific ARARs (i.e., Class I groundwater quality criteria).  The landfill gas control
system would address the potential future residents scenario described in the baseline risk assessment
associated with uncontrolled landfill gas migration.

Summary of Landfill Capping Alternatives

Construction of a new cover/cap over the entire landfill will minimize the infiltration of precipitation into
the landfill. The covering or capping of the landfill is a general remedial response action that is also
described as a containment option. State and Federal regulations and ARARs (i.e., 35 IAC 811/814 and
40 CFR 258) require municipal landfills to be adequately covered. The required, relevant and appropriate
environmental regulatory standards for the landfill capping action can be used to address the remedial
action  objectives associated with both the prevention of direct contact with refuse and the control of
leachate. Landfill  capping reduces the generation of leachate and migration of leachate, contaminants
from the leachate and buried landfill refuse to the groundwater and surface waters, such as the
Kishwaukee River. By minimizing the downward infiltration of precipitation into the landfill, landfill
capping is an effective containment technology that prevents direct human contact with the landfill waste
and reduces the infiltration of precipitation (i.e., snow, rain) and thus the corresponding leachate
generation.

Each of the alternatives is listed and discussed in greater detail below:

Alternative 1 - No Action

Estimated Cost: none                       Operation & Maintenance Activities:  none

As stated previously, the No-Action Alternative is required by the National  Oil and Hazardous Substance
Pollution Contingency Plan (NCP). Its purpose is to allow comparison of this alternative to other
alternatives and to conditions that currently exist and that will likely exist in the future. No active remedial
response actions would occur beyond those that presently exist at the site. This  alternative  would include
leaving the interim response cap in place without the implementation of additional capping  or control
technologies (e.g., gas extraction or leachate collection). The current institutional controls include such
items as fencing for site security, zoning and health ordinances that restrict land and groundwater usage
would  continue. Deed restrictions for land use are already in place for the soil  borrow area west of and
adjacent to the landfill. The soil borrow area is also part of the Groundwater Management Zone for site
remediation.
                                               65

-------
The No Action Alternative would allow for the continuation of groundwater contamination for an
indefinite period of time, leachate seeps, exposed refuse, surface water contamination, landfill gas
generation and migration, and allow the leachate surface impoundment to remain.

The No-Action Alternative would not directly reduce the current and possible future levels of leachate
within the landfill. The partial interim cap was previously constructed as a short term emergency
procedure has not been protected from the effects of numerous rounds of freezing and thawing,
desiccation, burrowing animals, plant root penetration, and erosion due to the absence of additional
protective layers. Continual unprotected exposure of the partial landfill cap to the natural elements will
allow, and may already have allowed, the  infiltration of precipitation into the interior of the landfill,
resulting in the generation of additional leachate.  The present absence of an adequate cap on the landfill
crest and the side slopes can and has resulted in the localized accumulation and seeping of leachate. The
absence of adequate soil cover and improper grading to address surface water run-off does pose a
long-term damage problem for the side slopes. Isolated  areas of exposed refuse and erosion gullies have
been observed. The uncontrolled release of landfill gas through the inadequately covered side slopes, and
possibly through the weakened areas of interim cap, can cause stress to the current vegetative cover on
the landfill. The stress to the vegetative cover could further exacerbate the erosion and cause further
deterioration of the present soil cover.

The No-Action alternative, as described above for the present partial landfill cap does not comply with 35
Illinois Administrative Code ARAR requirements 811 and 814, and it does  not meet the more limited and
less protective requirements of 807, in that soil cover depth does not meet the minimum requirement of
two feet of soil on all areas of the landfill, in that only the landfill crest 17 acres is covered with two feet
of soil. Some areas on the side slopes  of only 6 inches of soil or less. As a result of the present cap
inadequacies, source control of contaminants located within the landfill would not occur because the
landfill side slopes do not have an adequate depth of soil cover. The inadequate soil depth would allow for
precipitation to filter through the landfill, thus generating more leachate and causing additional
groundwater contamination, In general, this alternative is not protective of human health and the
environment to the extent required by the regulations.

Alternatives 2A and 2B

Alternative 2A Landfill Cap Details

                          Total Alternative 2A Costs include:
Cap Construction
Leachate Piezometer and Gas Probe Installation
Leachate Bed Construction
Gas Collection System
$4,545,600
$88,600
$1,220,000
$419,000
                                               66

-------
Closure of Surface Impoundment
Engineering and Construction
Operation and Maintenance
Total 2 A Costs
$163,250
$4,222,311
$3,089,862
$13,748,624
Alternative 2A involves leaving the older interim cap in place as is on the crest of the landfill, but
extending the original cap to include the side slopes in order to provide adequate soil cover to mitigate
leachate seeps. This would require that the side slopes would first be graded to provide a more uniform
slope and run-off control to minimize future erosion damage to the cap. After grading, a two-foot
compacted clay cap would be constructed over the graded landfill side slopes to cover the horizontal
extent of buried refuse. A geosynthetic drainage layer would be installed on the side slopes only. Next a
minimum of six inches of top-soil would be placed over the compacted clay to support vegetative growth
to minimize erosion.
                                                67

-------
Alternative 2B Landfill Cap Details:
                                  Total Alternative 2B Costs include:
Cap Construction
Leachate Piezometer and Gas Probe Installation
Leachate Bed Construction
Gas Collection System
Closure of Surface Impoundment
Engineering and Construction
Operation and Maintenance
Total 2B Costs
$8,866,250
$88,600
$1,220,000
$419,000
$163,250
$4,222.311
$3,089,862
$20,387,108
Alternative 2B is a variation that includes all of 2A plus the inclusion of a thirty-inch soil freeze-thaw
protection layer (plus the minimum of six inches of topsoil vegetative layer) over the landfill crest and side
slopes. The three-foot frost protection layer would protect the two-foot compacted clay cap layer from
the effects of freezing and thawing that over time may damage the underlying two-foot compacted clay
layer. The average soil frost/freeze depth for winters in northern Illinois is three feet. The State of Illinois
requires the three-foot freeze protection later for municipal landfills, as per 35 IAC Part 811. The 811
regulations were instituted to replace inadequacies found in the older 807 regulations. In addition to the
additional depth of soil, between the two soil layers a geosynthetic drainage net layer would be installed on
both the top and side slopes of the landfill. The drainage layer would allow for precipitation that
accumulates in the freeze protection layer to drain away from the underlying clay layer. Under the
appropriate circumstances, a one-foot sand drainage layer could be substituted for the geosynthetic net.

Alternatives 3A and 3B

Alternative 3A Landfill Cap Details
                                  Total Alternative 3A Costs include:
Cap Construction
Leachate Piezometer and Gas Probe Installation
Leachate Bed Construction
Gas Collection System
Closure of Surface Impoundment
Engineering and Construction
Operation and Maintenance
Total Alternative 3A Costs
$7,277,650
$88,600
$1,220,000
$419,000
$163,250
$4,222,311
$3,089,862
$18,277,056
                                                68

-------
In addition to the non-cap remedial action components for landfill gas and leachate remediation, noted
above, Alternatives 3A and 3B include the following additional landfill cap options.

Alternative 3 A involves extending the interim cap (2ft. of compacted clay) from the top of the landfill
onto the side slopes in order to provide adequate soil cover to mitigate leachate seeps. The side slopes
would be graded to provide a more uniform slope and to control storm water runoff to minimize future
erosion damage to the cap. A two-foot compacted layer of clay soil would be constructed to form a cap
over the landfill side slopes to insure adequate cover of the buried refuse. On top of the two-foot side
slope cap a six-inch top-soil layer for vegetation would be placed.  The vegetative layer will minimize the
absorption of precipitation, thus reducing the generation of leachate within the landfill. A thin geosynthetic
net drainage layer would be placed only on the side  slopes. These components  are common  to Alternative
2A.

In addition, over the top of the two-foot thick compacted clay interim cap, a second layer would be
placed. This second layer is a Geosynthetic Clay Layer (GCL). The GCL is a relatively thin layer of
processed clay (typically bentonite) either bonded to geomembrane or fixed between two sheets of
geotextile or geotextile and a geosynthetic geomembrane called a flexible membrane liner (FML). A
geomembrane is a polymeric sheet material that is impervious to liquid as long as it maintains its integrity.
A geotextile is a woven or non-woven sheet of material less impervious to liquid than a geomembrane, but
more resistant to penetration damage.

The inclusion of a GCL secondary barrier over the two-foot compacted interim cap would reduce the
infiltration of precipitation (snow melt and rain water) into the underlying clay cap, thus protecting the
integrity of the interim cap layer from moisture damage, and resulting in the reduction of leachate
generation and groundwater contamination. Alternative 3A includes all of Alternative 2A plus the GCL
barrier.

Alternative 3B Landfill Cap Details

                                 Total Alternative 3B Costs include:
Cap Construction
Leachate Piezometer and Gas Probe Installation
Leachate Bed Construction
Gas Collection System
Closure of Surface Impoundment
Engineering and Construction
Operation and Maintenance
Total Alternative 3B Costs
$9,687,250
$88,600
$1,220,000
$419,000
$163,250
$4,222,311
$3,089,862
$21,719,025
                                               69

-------
Alternative 3B includes all of Alternative 3A plus a thirty-inch freeze protection soil layer with a six-inch
top soil vegetative layer on top of the two-foot compacted clay interim cap layer, the geonet drainage
layer, and the GCL barrier layer. The details of the thirty-inch freeze protection soil layer with the six-inch
vegetative layer are included above in Alternative 2B. The GCL layer would not be extended over the
landfill side slopes.

Alternative 4

Alternative 4 Landfill Cap Details


                                   Total Alternative 4 Costs include:
Cap Construction
Leachate Piezometer and Gas Probe Installation
Leachate Bed Construction
Gas Collection System
Closure of Surface Impoundment
Engineering and Construction
Operation and Maintenance
Total Alternative 4 Costs
$6,815,950
$88,600
$1,220,000
$419,000
$163,250
$4,222,311
$3,089,862
$16,829,193
This option includes the previously installed interim cap (two-feet of compacted clay), located only on the
top of the landfill, and not on the slopes. The side slopes would be graded to provide a more uniform slope
and run-off control to minimize future erosion damage and provide a proper surface for the installation of
the Geosynthetic-Clay Layer (GCL). The GCL used will contain a treated bentonite (clay) layer
sandwiched between a woven, geotextile fabric component layer and a geomembrane component on top.
A geosynthetic drainage net layer would be installed over the GCL and the entire landfill. The geo-net
layer would provide drainage for precipitation that would infiltrate the landfill from snow or rain, thus
further reducing leachate generation and groundwater contamination. Because the GCL would not
provide sufficient counterweight to prevent leachate seeps from leachate already accumulated within the
landfill, an additional soil layer consisting of a minimum soil depth of 18 inches will be used to cover the
GCL. The leachate monitoring data collected during the Pre-Design phase would be used to specify the
soil  types, thickness, and any compaction requirements for the cover layer in order to provide adequate
protection against the recurrence of leachate seeps. The eighteen (18) inch soil cover protective layer will
include a twelve layer soil layer combined with six inches of topsoil as a vegetative layer.

Alternative 4A
                                               70

-------
Alternative 4A Landfill Cap Details
                                 Total Alternative 4A Costs include:
Cap Construction
Leachate Piezometer and Gas Probe Installation
Leachate Bed Construction
Gas Collection System
Closure of Surface Impoundment
Engineering and Construction
Operation and Maintenance
Total Alternative 4A Costs
$7,461,950
$88,600
$1,220,000
$419,000
$163,250
$4,222,311
$3,089,862
$17,475,193
Alternative 4A is an option not included in the FS. This option is proposed by the Illinois EPA as a
modification to Alternative 4 to assure that the detailed design for the site remedy is developed to satisfy
ARARs, remedial action objectives, and Illinois EPA performance criteria, so that the performance,
implementability, and cost-effectiveness of the remedy can be optimized. Alternative 4A is a compromise
between Alternatives 4 and 5, with the difference being that the soil cover be a minimum of 30 inches in
depth on top of the landfill and be allowed to taper to 24 inches minimum at the toe of the landfill. The 24
inches at the toe of the landfill will be allowed due to slope restrictions caused by the landfill cap's
proximity to the property boundaries and physical barriers such  as railroad tracks and fiber optic
underground cables. The geomembrane, as the top component of the Geosynthetic Clay Layer ("GCL"),
will protect the bentonite layer of the GCL from root penetration, desiccation, erosion impacts, and
burrowing animals. The proposed soil protective layer depths are expected to provide a safeguard against
long-term environmental degradation of the GCL, provide the necessary depth for good vegetative root
growth,  minimizing erosion and thus protecting the GCL. Good vegetative growth is necessary to minimize
soil erosion of the cap. Before the GCL is placed, the old interim cap, consisting of two feet of compacted
clay on the crest of the landfill will be repaired where necessary, and the side slopes will be backfilled and
covered with a minimum of 12 inches of compacted soil for the cap's subsoil/grading (foundation) layer.
Up to six inches maximum depth of soil may be removed from the two feet of clay crest, to be used on
the sideslopes. This work will be undertaken to insure adequate cover soils over areas that have eroded,
and/or contain leachate seeps or have exposed refuse. The subsoil/grading layer will be properly prepared
to protect the GCL from the landfill contents and items in the soil such as large dirt clods, rocks, and roots.
Alternative 4 A will substantively meet the Illinois EPA regulations and ARARs requirement for 35 I AC,
Subpart C,  Section 811.314(c)(2).
                                               71

-------
Alternative 5

Alternative 5 Landfill Cap Details
                                  Total Alternative 5 Costs include:
Cap Construction
Leachate Piezometer and Gas Probe Installation
Leachate Bed Construction
Gas Collection System
Closure of Surface Impoundment
Engineering and Construction
Operation and Maintenance
Total Alternative 5 Costs
$8,142,750
$88,600
$1,220,000
$419,000
$163,250
$4,222,311
$3,089,862
$18,792,446
Alternative 5 is technically identical to both 4 and 4A, in all aspects except it includes a protective soil
cover of 36 inches in depth over the top of the GCL, and does not require a minimum 12 inches of subsoil.
Alternative does include a grading/subsoil layer of about 6 inches in depth. This alternative complies with
Illinois regulations and ARARs. It differs from Alternative 4 which requires a soil cover of only 18 inches
and Alternative 4A which requires a soil cover of only 30  inches on top of the landfill, with a decrease to
a 24 inches at the bottom of the landfill slopes.
X. Comparative Evaluation of Alternatives

This section represents an analysis of the remedial alternatives listed above. The analysis provides
information to compare alternatives and demonstrate satisfaction with the CERCLA remedy selection
requirements and the nine evaluation criteria. Capping Alternative 4A, in combination with common
non-cap components of the Remedial Action, meets the nine criteria better than any other capping options
that were combined with the common remedial components.

The common non-cap  components of the Remedial Action, in combination with the respective capping
options, address the remedial action objectives by mitigating the leachate seep conditions, preventing
direct contact with buried refuse and impacted liquids and sediments, providing institutional controls that
would not allow future development of the landfill and in the IRM soil borrow pit on the west because of
the contaminated groundwater, intercepting uncontrolled gas migration towards the residential homes to
the west, and minimizing future migration potential of leachate constituents to groundwater.

                                               72

-------
For the common non-cap components of the remediation there is no comparative analysis since all of the
non-cap components of remediation are used in conjunction with each of the capping options. The
common non-cap components of the remediation are considered to be a shared or common component of
each capping option, and it is the combined remedial components of each capping remedial alternative that
are evaluated using the nine criteria.

Analysis

Overall Protection of Human Health and the Environment
Overall  protection of human health and the environment addresses whether each alternative provides
adequate protection of human health and the environment and describes how risks posed through each
exposure pathway are  eliminated, reduced, or controlled, through treatment, engineering controls, and/or
institutional controls.

Alternative 1:  Alternative 1 (No Action Alternative) would not be protective of human health and the
environment because the alternative would not prevent exposure to site contaminants both on-site and
off-site.  Alternative  1 only includes leaving the IRM cap in place, institutional controls , and monitored
natural attenuation. Even though Alternative 1 would provide some level of overall protectiveness, it
would not address leachate seeps or completely control landfill gas migration even though the active  gas
system has already been installed.  Gas can migrate through the landfill sideslopes where there is
inadequate soil cover.  The present cap is inadequate to reduce the infiltration of precipitation to the
interior of the landfill and would not further reduce the migration of potential contaminants to
groundwater. The contaminated groundwater could pose a risk to the Kishwaukee River ecosystem.
Leachate seeps can still be observed at the landfill. In addition, areas of exposed refuse, and leachate
contaminated soils are evident along the landfill side slopes where insufficient soil cover  presently exists.
Trespassers could be at risk due to the surface impoundment. Leachate that could flow off-site could also
pose a risk.

Alternative 2A:  Alternative 2A would not be protective of human health and the environment since it may
not provide a reliable means of preventing exposure to site contaminants over time. It would not allow for
adequate protection of the landfill  cap's compacted clay layer from various types of damage including
freeze-thaw cycles, desiccation, animal burrowing, plant root penetration, and erosion. The integrity of the
landfill cap would be a problem. Also, this alternative does not provide for adequate storm water drainage,
nor adequately reduce  precipitation infiltration that could result in additional leachate contaminants moving
into the  groundwater. It would, however, be expected to reduce infiltration rates versus the initial
uncontrolled conditions by 74% to 95%. Localized areas of leachate seeps may continue to be a potential
problem. Gas migration could be a potential problem due to the inadequate depth of the soil cover and the
porous nature of soils.  Alternative  2A is a single barrier cap. Also, this cap may not be able to eventually
meet the Class I groundwater criteria, nor-prevent leachate seeps.

Alternative 2B :  The Alternative 2B landfill cap would be expected to be provide more protection than
alternative 2A, because it is a two barrier cap that includes a protective soil layer to  cover

                                                73

-------
the compacted clay layer. However, the cap may not be overall protective. Alternative 2B would be
expected to reduce infiltration rates by only approximately 89%. This level of expected infiltration
reduction is one of lowest, and therefore one of the least protective rates. This infiltration rate level of
reduction would not meet the MCL for vinyl chloride. Also, alternative 2B Would result in
implementability problems because the cap would extend offsite.

Alternatives 3A and 3B:  Alternatives 3A and 3B and their capping approaches would be more
protective of human health and the environment than Alternative 1, in that both considerably reduce
infiltration of water into the landfill, and offer some improvement over the single barrier clay cap system
of Alternative 2A. It is estimated that Alternative 3 A would reduce infiltration from between 90% to 99%
under optimum conditions. It should be feasible to ultimately attain Class I groundwater quality criteria for
either cap options. However, 3A would  not meet the Class I groundwater criteria for vinyl chloride that
requires at least a 93% reduction in infiltration rates, therefore it may not be adequately protective of
human health and the environment. Alternative  3A, however does not include a protective soil layer over
the GCL on the landfill crest, nor for the compacted clay soil on the landfill sideslopes. Alternative 3A is
subject to degradation from freeze-thaw cycles, and erosion, leachate seeps and burrowing animals on the
sideslopes. With only 6 inches of soil over the GCL, it would not allow for adequate vegetative growth to
hold the soil in place, thus resulting in erosion problems and exposing of the GCL. Without an adequate
protective soil layer, the long-term integrity of the cap may be in question. Also, the cap would not provide
sufficient counterweight to prevent leachate seeps. Alternative 3B could result in a precipitation reduction
of only about 94%, which is borderline for eventually in meeting the vinyl chloride MCLs . This is in the
mid-range for precipitation reduction. The cost for Alternative 3B is the highest of all capping options.

Alternative 4:  Alternative 4 may be protective of human health and the environment. The reduction of
infiltration into the landfill is expected to be 97% to 99%. It should be feasible to ultimately obtain Class I
groundwater criteria with this cap, if cap integrity can be maintained. There is concern, however, that the
proposed 18 inch protective soil layer will  be inadequate to maintain the long-term integrity of the GCL
and protect it from freeze-thaw cycles. There also is some concern that the cap may not provide
sufficient counterweight to prevent leachate seeps. This capping  option is the second least expensive.

Alternative 4A:  Alternative 4A would be protective of human health and the environment; and possibly
the most protective. The reduction of precipitation into the landfill would be expected to be between 97%
and 99%. The cap would  be protective of human health and the environment and play a major role in
cleaning the groundwater ultimately to Class I groundwater criteria levels, by effectively reducing
leachate generation and contaminate migration.  This cap option provides an adequate protective soil layer
depth for the GCL component of the cap against the effects of freeze-thaw cycles, thus maintaining cap
integrity. The cost of this  capping option falls within the mid-range of costs.

Alternative 5:  Alternative 5 would be protective of human health and the environment.  The
                                               74

-------
reduction of water infiltration into the landfill is expected to be 99% . This cap option provides an
adequate protective soil layer depth for the GCL component of the cap against the effects of freeze-thaw
cycles, thus maintaining cap integrity. However, there would be technical  difficulties in constructing this
cap due to landfill boundaries and physical barriers. The cost is estimated to be more expensive than
Alternative 4A.

Compliance tvith Applicable or Relevant and Appropriate Requirements
Section 121(d) of CERCLA andNCP Section 300.430(f)(l)(ii)(B) require that remedial actions at
CERCLA sites at least attain legally applicable or relevant and appropriate Federal and State
requirements, standards, criteria, and limitations which are collectively referred to as "ARARs," unless
such ARARs are waived under CERCLA section 121(d)(4).

ARARs can be chemical-specific, action-specific and location-specific. In addition to the
chemical-specific ARARs for soil/sediment, groundwater and surface water, the action-specific ARAR
for landfill closure requirements have a significant role for this Site. This is especially due to the history of
the Site. The interim cap did not meet 35 IAC, Part 807 for the landfill side slopes, nor did it meet any of
the requirements for 35 IAC, Part 811/814.

Illinois' 35 IAC Part 807 requirements were effectively replaced by more stringent landfill requirements
under 35 IAC Parts 810-815, effective on September 18, 1990. The new Illinois landfill regulations were
passed, in large part, to address landfill cap failures under the old Part 807 standards. In general, the new
Illinois regulations were more extensive and more stringent than the federal RCRA Subtitle D landfill
standards (which were effective October 9, 1991). The Illinois regulations were revised to incorporate the
aspects of RCRA Subtitle D that were not already covered by Illinois law, and allowed Illinois to
implement Subtitle D.

The new Illinois standards had certain grandfather provisions. In particular, Part 814, Subpart E of the
1990 regulations  allowed existing facilities to close under the old regulations (35 IAC 807) if closure was
initiated by September 18, 1992.

Although the operators of the MIG/DeWane landfill did not initiate closure prior to the landfill being
abandoned in 1988, the landfill did stop receiving wastes prior to 1992. Originally, the landfill  may have
been entitled under state law to close under the old  807 closure standards. However, federal law provides
that when hazardous wastes will be left at a site, state and federal requirements that may not be directly
applicable, may still  be relevant and appropriate to the circumstances  of the release. Apparently the
landfill, although permitted to do so at the time, received wastes containing hazardous constituents. This
same situation occurred at many Municipal landfills prior to the enactment of the RCRA regulations of
1980.

If a standard, or a portion of a standard, is relevant and appropriate, then  that standard (or portion thereof)
must be attained by the remedy just as if the standard were directly applicable, The 111. EPA and the U.S.
EPA determined that the landfill cap and other provisions of Part 35 IAC 811/814 are relevant and
appropriate due to the circumstances of the release of chemical
                                              75

-------
contaminants.

Due to the dates during which waste was disposed of within the landfill, 35 IAC 807 may be considered
the only directly applicable regulations. However, it is entirely appropriate to follow the detailed
requirements specified in the 35 IAC 811/814 regulations in order to comply with the general
requirements of the older 807 regulations that lack details. For example, the old regulations only have
general provisions prohibiting threats of air pollution (807.312) and water pollution (807.313 & 870.315).
Specific requirements describing details for gas collection, leachate collection and monitoring of air and
groundwater are lacking. Yet, those systems may be necessary to comply with the old general provisions.
It is both relevant and appropriate to follow the more detailed standards found in 34 IAC  811/814 to
provide for a more environmentally sound landfill system.

The Illinois EPA and the U.S. EPA believe that 35 IAC 807 is applicable and that 35 IAC 811/814 are
relevant and appropriate. The Site was abandoned and presented a sufficient hazard to human health and
the environment to be placed on Superfund's list of national priorities. At the time of its listing on the NPL
the site did not have a landfill bottom liner, adequate landfill gas controls, any significant long-term
maintenance, nor capping materials impermeable enough to protect groundwater, or protection of the cap
from freeze-thaw or wet-dry cycle (which would ultimately impact cap integrity). Groundwater at the Site
became contaminated at levels exceeding federal and state action limits. Although interim measures were
initiated in 1991 to stabilize the site  and reduce infiltration of water,  only a partial cap was placed on the
landfill and it did not fully meet the 807 requirements for the landfill side slopes, but only for the landfill
crest or about 1/3 of the landfill area. The existing partial cover, or interim cap has been subjected to
repeated  freeze-thaw and wet-dry cycles and needs to be repaired and reconstructed to meet the 811
standards.

Alternative 1:  Alternative 1 does not comply with the 35 I AC 807 requirements nor with the 35 I AC
811 ARARs for landfills. Even after the interim cap work of 1992/3, the landfill does not  comply with
Section 807.305 (Cover), Section 807.312 (Air Pollution), Section 807.313  (Water Pollution), and Section
807.315 (Protection of Waters of the State).  Until contaminant concentrations are reduced to acceptable
levels through gas removal, leachate removal, landfill capping, waste containment, and the natural
attenuation mechanisms for groundwater, the requirements of 35 I AC Parts 811/814,  as well as various
other regulations would not be met.  This  alternative also  would not meet the 35 IAC 620 groundwater
regulation ARARs.

Alternatives 2A and 2B:  Alternative 2A does not comply with ARARs for remediating the landfill until
contaminant concentrations are reduced to acceptable levels. The proposed cap does not meet the
requirements of 35 IAC Parts 811/814. Alternative 2B may meet the 620 ARARs for the upper range for
infiltration rate reduction, but the low range of the infiltration rate reduction estimated would not meet the
MCLs for vinyl chloride, thus it would not comply with the 620 ARAR. The cap would not be adequate to
effectively reduce the generation of leachate, and thus groundwater contamination. Alternative 2B would
not comply with the requirements of
                                               76

-------
35 IAC Parts 811/814.

Alternatives 3A arid-SB:  Alternatives 3A do not comply with 35 IAC Parts 811/814. Alternative 3A does
not provide adequate protection from the affects of freeze and thaw, thus the cap integrity would not meet
the regulations required by 811. The range estimated for the infiltration rate is too low and that low end of
the range to effectively remediate vinyl chloride and meet the groundwater regulations, 35 IAC 620.
Alternative 3B meets the  811 requirements, put would not meet the 620 ARARs.

Alternative 4:  Alternative 4 does not comply with 35 IAC Parts 811/814, in that the depth of the
protective soil layer cover over the GCL would be inadequate, and may result in the failure to eventually
comply with 620 ARARs.

Alternative 4A: Alternative 4A does more fully comply with 35 IAC Parts 811/814, in that the depth of
protective soil layer cover in combination with the GCL would be adequate to meet the 620 ARARs.

Alternative 5:  Alternative 5 does comply with 35 IAC Parts 811/814 and would be expected to meet the
620 ARAR.

Long-Term Effectiveness and Permanence
Long-term effectiveness and permanence refers to expected residual risk and the ability of a remedy to
maintain reliable protection of human health and the environment over time, once clean-up levels have
been met.  This criterion includes the consideration of residual risk that will remain onsite following
remediation and the adequacy  and reliability of controls.

Alternatives 1. 2A and 3A:  Alternative 1 would not provide the required long-term effectiveness and
permanence due to inadequate depth of soil cover, inadequate protection from freeze-thaw cycles,
etc.,(see details above in the Overall Protection of Human Health and the Environment section). For 2A
and 3 A, the long-term integrity of the cap design is also doubtful. The lack of adequate cap integrity
would result in continued exposure of refuse, excessive leachate generation, and the continuing
contamination of groundwater above the  MCLs.

Alternatives 2B and 3B:  These two alternative would provide better containment of the contaminants,
then alternatives 1, 2A and 3 A, and reduce the generation of leachate. However, the long-term
effectiveness and  permanence may not be adequate since they do not meet the recommended minimum
cap design requirements to adequately reduce groundwater infiltration to allow for a reduction in leachate
generation levels.  Without an adequate  reduction in leachate generation, natural attenuation would not be
able to reduce all  groundwater contaminants to eventually meet the MCLs.

Alternative 4:  This alternative may not provide for adequate long-term protection of the critical
component of its cap design, the GCL;  therefore it would not appear to meet this criterion. The
                                               77

-------
inadequate depth of protective soil cover may result in damage to the GCL layer, resulting in the
excessive infiltration of precipitation into the landfill. The excess infiltration of precipitation would result in
leachate being generated and contaminating the ground-water.

Alternative 4A:  The selection of this alternative will incorporate a more protective cap by providing a
thicker or deeper protective layer soil layer, resulting in better vegetative rooting, thus less precipitation
infiltration into the landfill. Freeze-thaw protection of the GCL layer would also be enhanced. This option
is expected to provide for the necessary long-term effectiveness and permanence required by the nine
evaluation criteria.

Alternative 5: This cap design would comply with the required regulations for landfill cap design that are
designed to achieve  long-term effectiveness and permanence.

Reduction ofToxicity, Mobility, or Volume through Treatment
Reduction of toxicity, mobility, or volume through treatment refers to the anticipated performance of the
treatment technologies that may be included as part of a remedy.

The leachate collected at the landfill via gravity flow wells will be either treated onsite or transported
offsite for treatment at a permitted wastewater treatment facility.  Landfill gas can be treated by both
venting and flaring (combustion) on site:

The natural treatment involved in all the alternatives is the capacity of the soils in the GMZ north of the
landfill to effectively naturally attenuate the groundwater contamination before contamination, above
regulated levels, reaches the Kishwaukee River. For natural attenuation to effectively occur, not only
must the soil be  capable to do the work, but also the source of the contamination must be effectively
contained, such as through the construction of an appropriate landfill cap. The appropriate landfill cap
would limit water (i.e., rain, snow) infiltration into the landfill, thus reducing leachate generation to
manageable levels. In addition, all alternatives, except for Alternative 1, include the installation of
additional leachate and gas removal. With the appropriate cap coupled with leachate and gas removal
technologies, the volume and mobility of leachate and gas should be reduced, thus  also reducing the
migration of contaminants to groundwater.

Alternatives 1. 2A and 3A: Alternative 1 would not meet this criterion. Alternatives 2A and 3A would not
be able to meet this criterion if the thickness, permeability and long-term integrity  of the cap are
questionable  as to their adequacy.

Alternatives 2B. and 3B:  Alternatives 2B and 3B would probably meet this criterion in the short-term, but
may be not in the long-term if there is cap integrity problems.

Alternative 4: Alternative 4 would most likely meet this criterion, if the long-term integrity of the landfill
cap can be maintained.
                                                 78

-------
Alternative 4A:  Alternative 4A would meet this criterion, since it would reduce the infiltration of
precipitation through the use of a cap which offers greater long-term effectiveness and permanence.

Alternative 5:  Alternative 5 should meet this criterion, as described above.

Short-Term Effectiveness
Short-term effectiveness addresses the period of time needed to implement the remedy and any adverse
impacts that may be posed to workers, the community and the environment during construction and
operation of the remedy until cleanup levels are achieved.

Alternative  1:  Since no additional remedial actions would be performed, short-term risks could occur to
trespassers if they entered the surface impoundment. Therefore this alternative does not provide adequate
short-term effectiveness.

Alternatives 2A-5: Construction of the final cover system, including leachate and gas withdraw scenarios,
include the potential for exposure of waste and direct contact by construction workers on-site. There is
also the potential for the limited release of landfill gas and volatilization of organic compounds into the
atmosphere, which could potentially affect downwind residences. Possible exposures would be minimal
and monitored. Alternatives 2A-5 should met the short-term effectiveness criterion. Generally all of the
alternatives could be constructed in 9 months or less, if started early in the construction  season (Spring)
and no weather related problems occurred.

Implementability
Implementability addresses the technical and administrative feasibility of a remedy from design through
construction and operation. Factors such as availability of services and materials, administrative feasibility,
and coordination with other governmental entities are also considered.

Alternatives 2-5 for capping and the other common components for site remediation all involve commonly
used construction materials and techniques for Superfund landfills. There are issues associated with the
construction of Alternatives 2A-5 for the side slope cap construction due to the close proximity of the
adjoining property boundaries and railroad and utility right-of-ways.  In order to completely cover the
delineated extent of buried refuse and maintain the required grading contours to properly promote surface
water runoff, the final cover would have to extend very close, or into, the railroad and utility right of ways
for all alternatives. For those alternatives without a final protective soil layer (2A, 3A, and 4) the
perimeter of the  cap would not extend as far as Alternatives 2B, 3B, or 5. Alternative 4A will be designed
to include an adequate protective soil layer with a final cover that stays within the property boundaries.
For the northern  landfill slope and property boundary where the cap  would extend up to  on into the
railroad and utility right-of-ways, if these constraints cannot be resolved,  the following options to
completing the cap construction are available:
                                                79

-------
•       Construction of a retaining wall or use of sheet piling to a height sufficient to contain the extended
        cap layers at the  property boundaries.

•       Contour the cap construction in such a manner that it terminates at the property boundary, and
        place a GCL and a lesser amount of soil cover over any portions of delineated refuse not directly
        covered by the final cap.

•       Excavate a sufficient amount of refuse along the northern side of the landfill to allow the final cap
        perimeter and necessary surface water diversion ditches to be constructed within the property
        boundary, and reconsolidate the excavated refuse beneath the final cap along flatter side slopes
        within other portions of the landfill.

Cost
The costs for the various  alternatives are given along with the descriptions of each individual alternative.
There are considerable differences in the prices for the alternatives within each operable unit. Note that
some of the alternatives may have a relatively large capital (initial) cost  but a small yearly operating cost;
or an alternative may have a small capital cost but a relatively large operating cost. The most effective
way  of evaluating these costs is to use the alternatives' "Net Present Value."

The Net Present Value Costs estimates range from  $13,748,624 for Alternative 2A to $21,719,025 for
Alternative 5. These costs include Cap Construction Cost, Total Capital Cost, and Net Present Value of
Operation and Maintenance Cost. Included in the Total Capital Cost are  the following: installation of
monitoring systems, leachate collection beds, and gas collection system, as well as surface impoundment
closure.

Alternative 1:  Cost would be limited to the remedial working already performed on and near the site.

Alternative 2A:  The estimated total cost is $13,748,624. The lowest except for Alternative 1.

Alternative 2B:  The estimated total cost is $20,387,108. The cost associated with this alternative is the
second highest overall.

Alternative 3 A:  The estimated total cost is $18,227,056. This cost falls within the high end of the
mid-range of costs.

Alternative 3B:  The estimated total cost is $21,719,025. This cost is the highest cost of all the available
options.

Alternative 4:  The estimated total cost is $16,829,193. This cost is at the high end of the low range for the
options.
                                                80

-------
Alternative 4A: The estimated total cost is $17,475,193. This cost is approximately within the middle of all
estimated costs for the available options.

Alternative 5:  The estimated total cost is $18,792,446. This cost is at the low end of the high range for the
options.

Support Agency Acceptance
The United States Environmental Protection Agency concur with the selected remedy. Illinois EPA
presently has the technical lead role, with the federal government providing the enforcement lead role
during the RI/FS, PP and ROD process. Starting with the RD/RA, the Illinois EPA will have both the
technical and enforcement leads.

Community Acceptance
The surrounding community accepts the remedy selected. The reaction to the remedy is further described
in the Responsiveness Summary at the end of this Record of Decision.
XL Principal Threat Wastes

The NCP establishes an expectation that USEPA will use treatment to address the principal threats posed
by a site wherever practicable (NCP Section 300.430(a)(l)(iii)(A)). Identifying principal threat wastes
combines concepts of both hazard and risk. In general, principal threat wastes are those source materials
considered to be highly toxic or highly mobile which generally cannot be contained in a reliable manner or
would present a significant risk to human health or the environment should exposure occur. Conversely,
non-principal threat wastes are those source materials that generally can be reliably contained and that
would present only a low risk in the event of exposure. The MIG/DeWane landfill does not contain
principal threat wastes.

Wastes that generally will be considered to constitute principal threats include, but are not limited to, the
following:

        Liquid source material - waste contained in drums, lagoons or tanks, free product in the
        subsurface (i.e., NAPLs) containing contaminants of concern (generally excluding groundwater).

        Mobile source material - surface soil or subsurface soil containing high concentrations of
        chemicals of concern that are (or potentially are) mobile due to wind entrainment, volatilization
        (e.g., VOCs), surface runoff,  or subsurface transport.

        Highly-toxic source material  - buried drummed non-liquid wastes, buried tanks

                                               81

-------
       containing non-liquid wastes, or soils containing significant concentrations of highly toxic
       materials.

Wastes that generally will not constitute principal threats include, but are not limited to, the following:

        Non-mobile contaminated source material  of low to moderate toxicity - surface soil
       containing chemicals of concern that generally are relatively immobile in air or ground water (i.e.,
       non-liquid, low volatility, low teachability contaminants such as high molecular weight compounds)
       in the specific environmental setting.

        Low toxicity source material - soil and subsurface soil concentrations not greatly above
       reference dose levels or that present an excess  cancer risk near the acceptable risk range were
       exposure to occur.

The MIG/DeWane landfill site does not contain principal threat wastes. This landfill is a Type I landfill as
is described in the U.S. EPA guidance document, Conducting Remedial Investigations/Feasibility
Studies for CERCLA Municipal Landfill Sites (EPA/540/p-91/001,February 1991).


XII. Summary of Selected Remedy


Summary of Rationale for the Selected Remedy

As stated previously, the selected remedy uses numerous common remedial components for the leachate
collection and monitoring system, for the landfill gas collection and monitoring system, for the leachate
surface impoundment closure, the site surface water diversion system, the implementation of access
restrictions and institutional controls, the natural attenuation of groundwater, and long-term groundwater
monitoring. The nine criteria served as the basis for conducting the alternative screening and detailed
analysis. The chosen remedy provides the best balance of tradeoffs with respect to the balancing and
modifying criteria. The chosen landfill cap alternative, 4A, along with the identified common non-cap
remedial action components  provide the best option for providing an appropriate level of containment and
long-term overall protection  of human health and the  environment.

Description of the Selected Remedy

The selected remedy is the common non-cap remedial action components and the Alternative 4A cap.
The non-cap and cap Alternative 4A remedial actions include the following:

•      Construction and operation of a leachate collection and monitoring system.
                                               82

-------
•       Construction and operation of an active and passive landfill gas collection system and monitoring
        program.

•       Leachate surface impoundment closure.

•       Surface water diversion system.

•       Implementation of access restrictions and institutional controls.

•       Natural attenuation of ground-water.

•       Long-term groundwater monitoring.

•       Construction of a new cap over the entire landfill to minimize the infiltration of precipitation into
        the landfill.

This remedy is an improvement over Alternative 4  due to the following two differences:

(1)  Alternative 4A provides for an increase in the overall soil cover depth from the eighteen inches to
    thirty inches on the landfill crest and a tapering of the soil depth from thirty inches at the top of the
    side slopes, down to twenty-four inches at the landfill toe; and

(2)  The backfilling  and covering of the side slopes  with a twelve-inch minimum depth compacted
    subsoil/grading layer.

Although Alternative 4 does specify that a grading layer will be placed, it provides for neither a minimum
soil depth, nor compaction requirements. The components of Alternatives 4A, with the identified soil depth
modifications, are described below, along with a brief explanation of the advantages over the other listed
alternatives.

The Alternative 4A landfill cover alternative, with its soil depth modifications, was chosen, in part, to
insure adequate reduction of groundwater infiltration into the landfill, thus reducing leachate and landfill
gas generation, and reducing the contamination of  groundwater by leachate. It was also chosen because
Alternative 4A is more protective of the GCL than  Alternative 4, while not being as costly as the
Alternative 5 landfill cover. The Alternative 4A landfill cap comprises a 2 1/2-foot soil protection and
vegetative layer on the crest of the landfill with a taper to a 2-foot protection layer at the toe of the slope.
In addition, a geosynthetic (geonet and geotextile) drainage layer, a composite barrier layer consisting of a
geosynthetic clay liner between a geosynthetic flexible membrane and a geotextile layer will be required.
These layers will be placed over the older interim two feet thick soil cover that already exists on the
landfill  crest and a subsoil/grading layer for a subgrade to be placed on the side-slopes.

                                                83

-------
Up to six inches of the cover clay from the existing cap will be removed and stockpiled for use as material
for the final capping of the landfill side-slopes. The remainder of the older interim two feet compacted soil
cover will be regraded and repaired as is necessary to provide a proper base for and the protection of the
other cover layers to be included in the cover system. The landfill slide-slopes will be backfilled as
necessary to cover exposed refuse, repair erosion gullies, and to mitigate leachate seeps. A compacted
soil layer, with a minimum depth of twelve inches will comprise the subsoil/grading layer to establish a
protective base or foundation for the GCL components. The existing interim cap on the crest of the landfill
will be recompacted.

A soil foundation layer will be constructed across the landfill at a level immediately beneath the cover
system hydraulic barrier layer. The functions of this layer are to cover exposed waste, achieve required
final grades, provide a smooth, firm foundation for overlying cover system components, protect cover
system components from buried waste, and support construction equipment with minimal rutting. Required
foundation material property, layer thickness, and compaction requirements, subgrade proofrolling,
requirements, required grades and construction tolerances and other necessary design criteria to
demonstrate acceptable layer performance will be established through the use of guidance documents,
pre-design studies and the remedial design process. This will be done in order to provide a firm soil
foundation suitable for installing the final landfill cover, which will consist of the GCL, drainage layer,
protective layer and vegetative layer.

As part of the remedial design, Interim Remedial Measures (IRM) cap material or underlying grading fill
may be considered for use as foundation layer material for the landfill side slopes.  Soil material from the
top of the landfill will  only be used for this purpose to the extent that the remaining cap material thickness
satisfies all applicable design criteria including all foundation layer criteria, permeability criteria as
appropriate, and final grading criteria. In no case will the post-excavation IRM cap material thickness on
top of the landfill be less than twelve inches. After soil removal, the surface of the remaining soil will be
graded, scarified, moisture conditioned if necessary, and compacted to satisfy the engineering
specifications developed during the remedial design.

The side slope soil cover and grading layer will protect the other cover layers from possible damage from
the landfill's contents,  freeze-thaw, intrusion (animal and human), root penetration, and vegetative growth.
The cover will also serve to provide slope stability. ARARs pertaining to the 35 111. Adm. Code require a
minimum of two feet compacted soil on side slopes (807)  and more for 811.314 (c). The final grading of
the total cover system  will result in a slope no  less than 3.0%.

Summary of Estimated Remedy Costs

The cost for the selected alternative is reproduced below primarily from the Feasibility Study. The only
changes from the original table is the amount of topsoil needed for cap construction.
                                               84

-------
    Feasibility Study Cost Estimate
       Alternative Number 4A
MIG/DeWane Landfill / Belvidere, Illinois
Remedial Task
A. Leachate Piezometer and Gas
Probe
Installation

Mobilization
Leachate Piezometer Installation
Landfill Gas Monitoring Well Nests
(two each)
Decontamination Equipment
Geologist Oversight
Total Cost for Monitoring
Systems

B. Cap Construction

Surface Water Diversion Ditches
Erosion Controls
Pipe Surface Water Runoff to
Kishwaukee River
Discharge Structure
Side Slope Grading
Geodrainage Net
Geosynthetic Clay Liner
Geotextile Fabric
Topsoil (2.5 feet)
Seeding
Total Cost for Cap Construction

C. Leachate Bed Construction

Leachate Drain Beds
Leachate Drainage Piping
Quantity



1
8
6
12
15




2,500
1
1,500
1
40,000
2,041 ,000
2,041 ,000
2,041 ,000
166,067
52




50,000
3,000
Unit



lump sum
each
each
days
mandays




linear feet
lump sum
linear feet
lump sum
cubic yards
square feet
square feet
square feet
cubic yards
acres




square feet
linear feet
Unit
Cost



$1 ,500
$5,000
$3,500
$300
$1 ,500




$25
$15,000
$60
$25,000
$12
$0.70
$0.90
$0.45
$15
$2,200




$6
$12
Total
Cost



$1 ,500
$40,000
$21 ,000
$3,600
$22,500




$62,500
$15,000
$90,000
$25,000
$480,000
$1 ,428,700
$1 ,836,900
$918,450
$2,491 ,000
$114,000




$300,000
$36,000
Subtotal








$88,600













$7,461,950





Cost
Basis



Two mobilizations
required
Approx. 50 ft in depth
Approx. 15 and 25ft in
depth






Along RR track and
borrow pit
Primarily silt fencing
required
Assumes direct routing
to north

Assumes uniform runoff
Side slopes and crest
Covers delineated
refuse
Side slopes and crest
Side slopes and crest





Upper portions of major
seeps
Routed to sumps
                85

-------
Sump Stations
Force Main Piping to Belvidere
POTW (Motel)
Sewer Tie-In
Leachate Storage Tanks (30,000
gals)
Leachate Disposal
(Motel)
Total Cost for Leachate Beds

D. Gas Collection System

Passive Vent Wells
Wellhead Completion
Passive Trench
Total Cost for Gas Collection

E. Closure of Surface
Impoundment

Removal and Disposal of Liquids
Excavation of
Sediments/Consolidation
Backfill to Grade
Total Cost for Impoundment
Closure

F. Engineering and
Construction Costs

Permitting and Legal Fees (1%)
(Note 2)
Mobilization / Demobilization (2%)
Engineering Design (10%)
Health and Safety (3%)
Engineering Oversight (5%)
Bonding and Insurance (3%)
Construction Management (7%)
Cap Construction QA/QC (1 .5%)
Construction Overhead and Profit
(15%)
Contingency (10%)
(Note 3)
Total Indirect Capital Costs

G. Annual Operation and
Maintenance
3
5,000
1
2
1 ,200,000




17
17
1,500




300,00
650
6,000

















each
linear feet
lump sum
each
gallons




each
each
linear feet




gallons
cubic yards
cubic yards

















$1 1 ,000
$17
$10,000
$78,000
$0.50




$5,000
$2,000
$200




$0.25
$25
$12

















$33,000
$85,000
$10,000
$156,000
$600,000




$85,000
$34,000
$300,000




$75,000
$16,250
$72,000




$113,188
$174,136
$957,748
$261 ,204
$348,272
$261 ,204
$609,476
$130,602
$1 ,306,020
$870,680








$1,220,000






$419,000






$163,250













$5,032,530


Located at toe of landfill
Tie-in along BR US20
Includes sampling
manhole
Includes automated
monitoring
1 20,000 gals/yravg for
10yrs




Approx. 50 ft depth

Approx 25 ft depth





Approx. 1 to 2 ft depth
Native soils backfilled to
grade

















86

-------

Groundwater, Leachate, Gas
Monitoring (Note 4)
Well Replacement, Repairs,
Redevelopment
General Facility Maintenance
Cap Inspection and Maintenance
Passive Gas Vents
Inspections/Repairs (Note 5)
Passive Trench
Inspections/Repairs
Landscaping
Reporting/Project Management
Total Annual O&M Cost
Net Present Value for Annual
O&M

TOTAL NET PRESENT VALUE
COST FOR ALTERNATIVE 4

1
1
4
4
1
1
100
1





annual
lump sum
quarters
quarters
lump sum
lump sum
acres
lump sum





$40,000
$15,000
$3,000
$6,000
$20,000
$15,000
$150
$60,000





$40,000
$15,000
$12,000
$24,000
$20,000
$15,000
$15,000
$60,000













$201,000
$3,089,862

$17,475,193

Annual sampling of each well
10 yr life cycle for each well
Basic road, fencing repairs, etc
Major repairs will not be required
10 yr life cycle for each well
10 yr life cycle for each trench
Mowing, fertilizing, etc.


5% discounted over 30 years


NOTES:

(1)   The leachate disposal cost estimates are based on continuing transportation to the Rockford POTW. Pretreatment costs are not included, since a
permit is already in place to transport leachate to the Rockford POTW, and pretreatment has not historically been required (i.e., leachate constituents did
not exceed applicable pretreatment criteria). The cost for a forcemain to the Belvidere POTW was also included in the event approval can be obtained to
directly discharge leachate to that treatment plant for a comparable unit cost without pretreatment.

(2)   The actual percentages used to determine the "Permitting and Legal Fees" and "Engineering Design" line items were adjusted slightly upward, and the
actual percentage used for the "Engineering Oversight" line item adjusted slightly downward, from the indicated percentages to allow for proper
comparison versus the other remedial alternatives.

(3)   A contingency of only 10% has  been used given the conservative unit costs used for each line item.

(4)   For simplicity in determining net present value, the monitoring costs are based on the annual sampling of up to 20 groundwater monitoring wells and
the existing leachate and gas monitoring wells. The FFS text describes quarterly monitoring  for the first two years and annual sampling thereafter. The
costs associated with the six extra sampling events over the first two years were distributed over the 30-year discounting period and then added to the
annual cost. In actuality, the annual monitoring cost is comprised of $32,000 for the annual  monitoring requirements, and an additional $8,000
distribution from the extra six monitoring events to be performed during the first two years.  The annual monitoring costs include the following:  a
two-person sampling crew in the field for three days; an extra three field days throughout the year to take quarterly water level measurements; analysis of
the 22 groundwater and leachate samples for VOCs, metals, and water quality parameters according to RI protocol; analysis of both gas samples for VOCs.
Reporting costs are included in the "Reporting/Project Management" line item.

(5)   Quarterly monitoring costs for the landfill gas collection system are included in this line item. Gas probes will be monitored using field
instrumentation for % LEL, % methane, % oxygen, % carbon dioxide, and total VOCs using a PID or FID.


Expected Outcomes of the  Selected Remedy


Land use for the site during the last thirty years has been for  refuse disposal. Prior to the site becoming a landfill it was
used to extract sand and gravel, and for agricultural purposes. The expected future land use  will be restricted with  no
development because the site is a landfill, and because of the type of final cap to be installed. Land use for the soil
borrow-pit to  the west  will  continue to be restricted. Its present use is already restricted due to the fact that it is a soil
borrow
                                                                   87

-------
area pit. Deed restrictions prohibit all residential development of the site and all uses of ground-water. The soil borrow pit
area also presently contains the landfill gas interceptor trench, gas extraction wells, gas probes and groundwater
monitoring wells. The agriculture field to the north is part of a planned GMZ for contaminated groundwater. Boone
County Department of Health ordinances prohibit installation of groundwater drinking wells in the flood plain. The
agricultural field presently has use restrictions because it is within the flood plain of the Kishwaukee River and Boone
County zoning ordinances restricts development. City water is provided to the residential development downgradient and
west of the landfill.

Groundwater use offsite is restricted as is mentioned above. If further restrictions are needed they will be required as part
of the final remedy. The time frame to achieve cleanup for offsite groundwater to Class I groundwater quality criteria
ARARs is expected to range from 13 to 26 years for West Glacial Pathway for both the planned and contingent leachate
removal scenarios, and using natural attenuation. For the North Interface Pathway the time for cleanup ranges from 54 to
108 years, depending on the leachate removal scenarios. For the planned leachate removal scenario, it is estimated that
groundwater remediation will occur in a range from 81 to 108 years. However, under the contingent leachate removal
scenario groundwater remediation is estimated to range from 54 to 81 years. Upon achieving cleanup levels to Class I
criteria, groundwater use may continue to be restricted to agricultural and industrial use, depending on local ordinances. The
use of onsite groundwater, and as necessary, offsite groundwater will be prohibited by deed restrictions. The time frame
to remove and reduce methane gas to safe and ARAR (35 IAC 811) compliant levels from the area of the subdivision
was estimated to be less than one year during the 1999 emergency response action. The time frame estimated for
reducing landfill gas migrating from the landfill down to acceptable ARAR levels is not certain, but landfill gas generation
rates have been declining since 1988.

The final cleanup level for each identified medium of concern that are expected to occur based on the chosen remedial
alternative and its various components is described below.  Although groundwater had not been identified in either the RI
or baseline risk assessment as a media of concern, low levels of various constitutents and some VOCs were detected in
down gradient groundwater. The final clean up levels for each contaminant in offsite groundwater will be the appropriate
MCLs, ARAR, or similar mandated or recommended level for each COC. The offsite migration of landfill gas has been
undergoing emergency response remediation since  early May 1999. Since that time, the offsite migration of landfill gas to
the west towards the subdivision has  been significantly reduced. Gas remediation will continue until as long as necessary
to be protective of human health, and the environment. In general, compliance with the groundwater and solid waste
ARARs that relate to landfill gas will meet this requirement.

The anticipated socio-economic and community revitalization impacts of the selected remedy is unknown at this time. The
anticipated environmental and ecological benefits are the cleaning up of groundwater to Class I criteria and the protection
of surface waters such as the Kishwaukee River, as well as the adjacent wetlands.

-------
Xin. Statutory Determinations
Under CERCLA Section 121 and the NCP, the lead agency must select remedies that are protective of
human health and the environment, attain Federal and State requirements that are applicable or relevant
and appropriate for this remedial action (or invoke an appropriate waiver), are cost-effective, and utilize
permanent solutions and alternative treatment technologies (or resource recovery) to the maximum extent
practicable. In addition, CERCLA includes a preference for remedies that employ treatment that
permanently and significantly reduces the volume, toxicity, or mobility of hazardous wastes as a principal
element and a bias against off-site disposal of untreated wastes.

Protection of Human Health and the Environment
Alternative 4A will be protective of human health and the environment. The reduction of precipitation into
the landfill would be expected to be between 97% and 99%. The cap will be protective of human health
and the environment and play a major role in cleaning the groundwater ultimately to Class I groundwater
criteria levels,  by effectively reducing leachate generation and contaminant migration. This cap option
provides an adequate protective soil layer depth for the GCL component of the cap  against the effects of
freeze-thaw cycles, thus maintaining cap  integrity.

Compliance with Applicable or Relevant and Appropriate Requirements
The selected remedy is comprised of a variety of ongoing actions including leachate collection and
treatment, landfill gas collection, residential gas collection, installation of a permanent protective landfill
cap, and treatment of groundwater through  monitored natural attenuation. These actions will comply with
all ARARs. The ARARs identified in the Feasibility Study are reproduced below.

                                            TABLE 4-1

                              Initial Screening of Potential ARARs & TBCs

                   State and Federal Requirements and Prerequisites for Applicability
                                MIG/DeWane Landfill / Belvidere, Illinois
    DESCRIPTION
         REQUIREMENTS AND PREREQUISITES
                 FOR APPLICABILITY
       CITATION
                                LOCATION-SPECIFIC ARARs & TBCs
 Within Flood plain
Actions to avoid adverse effects, minimize potential harm, or
restore and preserve natural and beneficial values in the event
remedial construction activities impact and identified floodplain
area. The actions will occur
Protection of floodplains (40
CFR 6, Appendix A); Fish
and Wildlife Coordination Act
(16 USC 661 etseq.);40
                                               89

-------

General Use Water
Quality Standards
Air Quality Standards
Air Emissions from
Landfill Gas Collection
Operations
Area Affecting Stream or
River
Wetlands
Endangered Species
in a floodplain including lowlands, relatively flat areas adjoining
inland and coastal waters, and other flood prone areas. The
landfill construction shall not restrict the flow of a 100-year
flood, result in washout of
solid waste from a 100-year flood, or reduce the temporary wate
1 00-year floodplain.
General use standards protect the waters of the State for
aquatic life, agricultural use, primary and secondary contact
use, most industrial use, as well as ensure the aesthetic quality
of the State's aquatic environment.
Ambient air quality standards to be maintained at all times.
National primary and secondary ambient air quality standards
(NAAQS) for sulfur dioxide, particulate matter, carbon
monoxide, volatile organic compounds (ozone), and nitrogen
dioxide. Air emissions of these
Parameters shall not cause an exceedance of these standards.
Actions to protect fish or wildlife. Applies when diversion,
channeling, or other activity that modifies a stream or river
affects fish or wildlife.
Site-specific operating permit requirements for activities which
impact wetlands.
Requires actions to conserve endangered species within
critical habitats upon which endangered species depend.
Includes consultation with the Department of the Interior.
CFR 6.302; Exec. Order
No. 11 988; 93 IAC 708, I L
Rev. Stat., CH19;35IAC
811; Boone Co. Ordinance
No. 88-02
r storage capacity of the
35 IAC 302.208
35 IAC 243
40 CFR 50, 60; 35 IAC
214,215,216,217
Fish and Wildlife
Coordination Act; 40 CFR
6.302
U.S. Army Corps of
Engineers permit
16 USC 1531; 50 CFR 200
ACTION-SPECIFIC ARARs & TBCs
A. REMEDIAL
CONSTRUCTION
RELATED
Occupational Safety and
Health Act
American Council of
Governmental Industrial
Hygienists (ACGIH)
Visual Emission
Standards and
Limitations
The following are requirements related to remedial
action construction activities.
Regulates worker health and safety during remedial
construction activities.
Establishes safety and allowable worker exposure standards
for use in remedial construction activities.
Emission standards for stationary sources and fuel combustion
emission systems.

29 U.S.C. 651-678; 29
CFR 191 0,1926
Threshold Limit Values
35 IAC 21 2
90

-------
Mobile Air Pollution
Standards
Motor vehicle air emission standards.
35 IAC 240
Particulate Criteria for
Stationary Sources
Particulate matter is not to be emitted into the atmosphere which
exceeds allowable emission levels. Fugitive particulate matter
from any storage or material handling process including truck
loading, conveyors,
Stockpiles, etc. during construction must be controlled.
35 IAC 212
Noise Limitations for
Motor Vehicles
Regulation applicable to all motor vehicles in Illinois.
35 IAC 902
Stormwater
Management
Stormwater management during construction activities.
40 CFR 122.44; 35 IAC 811
Monitoring Well
Construction
Establishes the minimum requirements for the construction of
monitoring wells.
77 IAC 920
Sealing of Drilling
Boreholes
Establishes minimum requirements for plugging and sealing of
boreholes.
35 IAC 811
    B. AIR MISSIONS
       RELATED
The following are requirements related to air emissions during long-term
operation of the landfill gas collection system.
National Emission
Standards for
Hazardous Air
Pollutants (NESHAPs)
and (HAPs)
Identifies HAPs and sets NESHAPs on an industry, process, or
chemical-specific basis. Includes monitoring, testing, reporting,
and recordkeeping requirements for each.
40 CFR 61, 63, 70; 35 IAC
243
Landfill Gas
Management
Design gas collection system for odor free operation.

Control of emissions from equipment, including particulate
matter, sulfur, organic material, carbon monoxide, and nitrogen
oxides.

File an Air Pollution Emission Notice (APEN) with State to include
estimation of emission rates for each pollutant expected.

Establishes odor criteria to identify odorous offsite emissions
which must be controlled.
40 CFR 52

35 IAC 211,212, 214, 215,
216,217
                                                                                   40 CFR 52
                                                                                   35 IAC 245
Construction and
Operating Permit
Requirements for
Emission Sources
Persons shall not discharge any contaminant into the
environment causing air pollution in Illinois. A construction and
operations permit is required for construction or modification of
any emission source.
35 IAC 201
     C. RESIDUALS
  DISPOSAL RELATED
The following are requirements related to the disposal of residual material from
soil and sediment excavation, or sludges or other residuals generated from
leachate pretreatment system operations.
                                                    91

-------
Identification and
Listing of Hazardous
Waste
Defines those solid wastes which are subject to regulation as
hazardous wastes.
40 CFR 261; 35 IAC 721
Hazardous Waste
Generation, Storage
and Disposal
Site must obtain a USEPA identification number.
                         Generator use and management of hazardous waste containers
                         must meet treatment facility requirements.

                         Generator tank storage of hazardous waste must meet design
                         and storage requirements for treatment facilities, excluding
                         closure requirements.

                         Temporary onsite storage of hazardous waste for offsite
                         disposal.

                         Temporary storage of excavated soils and sediments in surface
                         waste piles must meet requirements for treatment facilities.
                         Ensure that hazardous constituents are contained or immobilized
                         within the waste pile.
40 CFR 262; 35 IAC 722
                                                          40CFR264Subpartl;35
                                                          IAC 724

                                                          40CFR264SubpartJ:35
                                                          IAC 724
                                                          35 IAC 722
                                                          40 CFR 264 Subpart L; 35
                                                          IAC 724
Hazardous Materials
Transportation
Regulations
Regulates transportation of hazardous materials under DOT
regulations, hazardous wastes under EPA regulations, and
special wastes under Illinois EPA regulations.
49 CFR 107, 171-177 and
40 CFR 263; 35 IAC 722,
723, 724
Transportation of
Hazardous Substances
IDOT requirements for transportation over Illinois highways.
92 IAC 171, 172, 173
Special Waste Hauling
Applies to all hauling of special wastes under Illinois EPA
regulations.
35 IAC 808, 809
Haulage Limitations on
Roadways
Oversized vehicles need a permit to travel on roadways.
IDOT Dir. of Highways Sec.
15 III. Vehicle Code based
on Federal Bridge Formulas
Placement of
Hazardous Waste in
Land Disposal Unit
Specific land disposal restrictions associated with the placement
of RCRA hazardous waste in a landfill, surface impoundment,
waste pile, injection well, land treatment facility, salt dome
formation, or underground mine or cave.
40 CFR 268 (Subpart D)
   D. SOLID WASTE/
 LANDFILL DISPOSAL
The following requirements apply to the implementation of a final remedy, as well
as the individual components of the remedial action. Potentially applicable Illinois
solid waste/landfill regulations are noted.
Previously Closed
Landfills
Provides requirements for solid waste permits, sanitary landfill
requirements, closure and post closure care, and financial
assurance for Municipal Solid Waste Landfills (MSWLFs) closed
prior to 1990.
35 IAC 807
Existing Landfills Still
Operating
Provides requirements for solid waste permits, sanitary landfill
requirements, closure and post closure care, and financial
assurance for existing  MSWLFs prior to 1990 which are still
operating.
35 IAC 814
                                                    92

-------
New Landfills
E. LEACH ATE
DISCHARGE RELA TED
Permit for the
Construction and
Operation of Treatment
Works
Discharge to Publicly
Owned Treatment Works
(POTW)
Leachate Storage
Provides requirements for solid waste permits, sanitary landfill
requirements, closure and post closure care, and financial
assurance for new MSWLFs after 1990.
The following are requirements related to the treatment
and discharge of leachate.
Illinois EPA permit requirements for construction and operation of
treatment and pretreatment systems and the corresponding
discharge authorization.
Pretreatment standards for discharge; includes prohibitions on the
discharge of pollutants that pass through the POTW without
treatment, interfere with POTW operation, contaminate POTW
sludge, or
Endanger health/safety of POTW workers.
Criteria for monitoring of treated water at a POTW.
City of Belvidere and Rockford POTW pretreatment requirements.
Underground storage tank design, construction, installation, and
operational requirements.
40 CFR 258; 35 IAC
811

35 IAC 309
40 CFR 403; 35 IAC
307,310
35 IAC 304
Local POTW
regulations
40 CFR 280; 35 IAC
170
CHEMICAL-SPECIFIC ARARs & TBCs
Safe Drinking Water Act
Maximum Contaminant
Level Goals
Illinois Groundwater
Quality Standards
General Use Water
Quality Standards
Ambient Water Quality
Criteria
Establishes primary and secondary maximum contaminant levels
(MCLs), which are enforceable standards of maximum permissible
levels of contaminants in drinking water from a public water
source.
Establishes drinking water quality goals set at levels of no known
or anticipated adverse health effects, with an adequate margin of
safety.
Establishes groundwater classes and chemical-specific water
quality standards for the State of Illinois. Also provides for
determination of a health advisory for other chemicals and
mixtures.
General use standards protect the waters of the State for aquatic
life, agricultural use, primary and secondary contact use, most
industrial use, as well as ensure the aesthetic quality of the State's
aquatic environment.
Sets criteria for water quality based on toxicity to aquatic
organisms and human health.
40 U.S.C. 300; 40 CFR
141,143
Pul.L. No. 99-339, 100
Stat. 642 (1986); 40
CFR 141
35 IAC 620
35 IAC 302
40 CFR 131; Quality
Criteria for Water,
1976, 1980, 1986
93

-------
Cost-Effectiveness
In the judgement of Illinois EPA, the selected remedy is the most cost-effective. In making this
determination, the following definition was used: "A remedy shall be cost effective if its costs are
proportional to its overall effectiveness." (NCP Section 300.430(f)(l)(ii)(D)). This was accomplished by
evaluation the "overall effectiveness" of those alternatives that satisfied the threshold criteria (i.e., were
both protective of human health and the environment and ARAR compliant). Overall effectiveness was
evaluated by assessing three of the five balancing criteria in combination (long-term effectiveness and
permanence; reduction in toxicity, mobility, and volume through treatment; and short-term effectiveness).
Overall effectiveness was then compared to costs to determine cost-effectiveness. The relationship of the
overall effectiveness of this remedial alternative was determined to be proportional to its costs and hence
this alternative represents a reasonable value for the money to be spent. Alternative  4A meets the nine
criteria, complies with ARARs, and with a cost that is in the mid-range of the various remedial options.

The total estimated cost for the project is approximatley $17,475,193.00.

Utilization of Permanent Solutions and Alternative Treatment Technologies (or Resource
Recovery Technologies) to the Maximum Extent Practicable
Illinois EPA has determined that the selected remedy represents the maximum extent to which permanent
solutions and treatment technologies can be utilized in a practicable manner at the site. Of those
alternatives that are protective of human health  and the environment and comply with ARARs, Illinois
EPA has determined that the selected remedy provides the best balance of trade-offs in terms of the five
balancing criteria, while also considering the statutory preference for treatment as a principal element,
bias against off-site treatment and disposal, and considering community acceptance.

The Selected Remedy effectively meets  landfill  containment requirements by limiting infiltration of
surface water into the landfill and thus achieving significant reductions in COC volumes leaving the
landfill, and the COC concentrations in the groundwater. The selected remedy does not present
short-term risks different from the other treatment alternatives. There are no special implementability
issues that set the selected remedy apart from any of the other alternatives evaluated.

Preference for Treatment as a Principal Element
Part of the selected remedy involves collecting  the leachate and treating it offsite. By utilizing treatment
as part of the remedy, the statutory preference for remedies that employ treatment as a principal element
is satisfied.

Five-Year Review Requirements
Because this remedy will result in hazardous substances, pollutants, or contaminants remaining on-site
above levels that allow for unlimited use and unrestricted exposure, a statutory review will be conducted
within five years after initiation of remedial action to ensure that the remedy
                                               94

-------
continues to be protective of human health and the environment.

XIV. Documentation of Significant Changes
The Proposed Plan was released for public comment in July, 1999. It identified Alternative 4A as the
preferred alternative. The Alternative 4A landfill cover alternative, with its soil depth modifications, was
chosen, in part, to ensure an adequate reduction of groundwater infiltration into the landfill, thus reducing
leachate and landfill gas generation, and reducing the contamination of groundwater by leachate.

The original Alternative 4A provided for thirty inches of protective soil cover over the GCL layer on the
landfill crest and tapering to twenty-four inches at the toe of the landfill slope.  Presently on the landfill the
interim cap is twenty-four inches of compacted soil cover on the crest and approximately six inches of
noncompacted soil on the slopes. The Illinois EPA originally was requiring a grading/foundation layer of
eighteen inches of compacted soil on the side slopes. After additional Illinois EPA evaluation, it was
determined that a minor modification to the technical aspects of the remedy could be effected without
sacrificing overall protection of human health and the environment, or ARAR  compliance. The
twenty-four inch interim cap on the landfill crest will be used as the foundation layer. A maximum of six
inches of soil from the existing cap will be removed from the crest to add to the side slopes to bring the
side slope foundation layer depth up to a minimum total of twelve inches compacted soil prior to the
placement of the remaining components of the cap (i.e., geosynthetics and soil).

The contingent remedies for groundwater, depending on the baseline risk assessment addendum, may
result in a significant change. The  addendum's impact on the potential risks's associated with the COCs
concentrations in groundwater west of the landfill will not be more fully known (and thus its significance)
until after the document is completed later in 2000.
                                               95

-------
96

-------
MIG/DeWane Landfill
    Superfund Site
   Belvidere, Illinois
 Responsiveness Summary
         for the
Proposed Remedial Alternative
  Illinois Environmental
    Protection Agency
        March 2000

-------
                                TABLE OF CONTENTS







Agency Decision	2



History/Background	2



Public Notice And Public Hearing	2



Responsiveness Summary	3



Future Activities	9



Illinois EPA Preferred Alternative	9



Public Repository	10



Distribution of Responsiveness Summary 	11



Illinois EPA Staff Who Can Answer Your Questions	11



Hearing Record Availability	11

-------
                                     AGENCY DECISION

The Illinois Environmental Protection Agency (Illinois EPA) prefers remedial alternative 4A which is
detailed on page 9.

                                  HISTORY BACKGROUND

The MIG/DeWane Superfund site (also known as Boone County landfill, Bonus landfill, or Kennedy
landfill) is located in Boone County approximately 0.25 miles east of the city of Belvidere, Illinois and 0.5
miles north of Business U.S.  Route 20. Primarily located in the south half of the southeastern quarter of
Section 30, Township 44 North, Range 4 East of the Third Principal Meridian. The landfill covers an area
of approximately 47 acres.

From 1969 through 1988, the landfill  accepted approximately 3.7 million cubic yards of household or
residential, municipal, commercial, and industrial waste. In 1984, the United States Environmental
Protection Agency (U.S.EPA) conducted a sampling inspection of the landfill to evaluate it for Superfund
consideration. In 1985, the State of Illinois filed a complaint against the landfill for violating their landfill
operating permit by exceeding the maximum height restriction by 20 feet or more. A court injunction
ordered the landfill to cease operations and it closed in June  1988. Instead of properly covering the waste
and closing the site, the owners abandoned it in July 1988. The landfill was placed on the National
Priorities List (NPL) on August 30, 1990.

There was a problem at the landfill associated with inadequate soil cover, exposed refuse, and multiple
leachate flows in the  early  1990's that was addressed by the interim response actions in late 1991 through
early 1993. Groundwater contamination has also been detected and investigated to determine the extent
and remedy necessary to manage any identified  risks associated with  the groundwater conditions. In early
1999, a landfill gas migration problem was identified. A gas extraction system was installed within a month
and the gas levels decreased when the system was activated.

                         PUBLIC NOTICE AND PUBLIC HEARING

The public hearing notice was published thrice (June 10, 17 and 24) in the Boone County Journal
newspaper. The public hearing notice was published thrice (June 11,18 and 25) in the Belvidere Daily
Republican and in the Rockford Register Star newspapers. The public hearing notice was posted on the
Illinois EPA's web site home page (http://www.epa. state.il.us) on June 18, 1999. Notice of the hearing
was sent to legislators, local officials, neighbors and interested citizens on June 14, 1999.

In accordance with the Comprehensive Environmental Response, Compensation, and Liability

-------
Act (CERCLA) of 1988 Section 117, 42 U.S.C. Section 9617 and pursuant to the Illinois EPA's
Procedures or Information and Quasi-Legislative Public Hearings 35 Illinois Administrative Code
(IAC) 164, the Illinois EPA held a public hearing on Tuesday, July 13, 1999. The public hearing began at 7
p.m. in the Boone County Community Building, 111 West 1st  Street, Belvidere, Illinois. Twenty-eight
persons attended the hearing with a court-reporter recording the proceedings. The Illinois EPA proposed
placing a multi-component cap over the MIG/DeWane landfill according to the provisions of remedial
alternative 4A. A transcript of the public hearing was prepared and is available for review at the public
repository.

The Illinois EPA received written and oral public comments on the proposed landfill cap. The public
comment period began on Friday, June 11, 1999 and ended on Friday, August 13, 1999. Several requests
were received from individuals or groups for an extension. All requested extensions were granted and
comments from those parties were due Friday, August 27, 1999.

Before determining which remedy would be most effective for the site, the Agency considered written
and oral comments on any of the proposed alternatives. The final Agency decision includes this summary
of questions and comments received along with Agency responses.

                              RESPONSIVENESS SUMMARY

The hearing record opened on Thursday, June 10, 1999, and closed on Friday, August 27, 1999.
Comments postmarked by midnight August 27, 1999, were included in the hearing record. This
responsiveness summary responds to questions and comments received from June 10, 1999, through
August 27 (postmark), 1999,  and comments from the public hearing.

Comments are a combination of direct quotes and summarized ideas (if several comments were similar)
and they appear in regular type.  The Illinois EPA  responses are in bold type.

1.    According to the Baseline Risk Assessment (March 1997) that evaluated the current and possible
     future risks associated  with the site, a conclusion was made that there would be an unacceptable
     level of risk for "future residents" from the leachate, groundwater, and landfill gases that could flow
     off-site and/or under the subdivision. Since the "future residents" of 1997 are now the current
     residents of 1999,  what actions are being taken to address and reduce the risk level to within
     acceptable boundaries  which  is necessary to protect the health of the residents?

     According to the risk assessment definitions, the future residents were occupants of
     homes built as close as 60-100 meters (200-300 feet) from the landfill. The risk
     assessment also assumed chronic long term exposure  from a site with no remediation.
     The closest home is more than  700 feet away and the site has already had some
     remediation with more planned, so the risk would be lower than what the 1997 risk
     assessment showed but the Illinois EPA agrees with the spirit of this comment that

-------
     request them to be removed at no cost to the residents. This issue will be handled by
     representatives of the MLTF.
     In addition, the Illinois EPA has initiated a contract with the same consultant that
     performed the 1997 baseline risk assessment to provide an current assessment using the
     most recent information and sampling results so that an updated account can be made
     about potential health risks that may affect the residents. U.S.EPA has also provided
     updated comments and a re-review of the 1997 baseline risk assessment regarding
     whether the current conditions have significantly altered the "future residents" findings of
     the 1997 risk assessment. USEPA and Illinois EPA have both concluded that new sample
     data is needed to calculate an updated risk assessment characterizing the current
     conditions at the site and within the Wycliffe Estates Subdivision. Samples for this
     purpose were taken in February and March with results expected back within one month.

2.    The area around the landfill needs to be fully and completely surveyed to  determine exactly where
     the sand/gravel seam is present so that it can be  determined which homes could be affected by the
     methane or any other contaminants (including chlorinated solvents)that may migrate. (This would
     also provide some assurance for homes that could not be affected due to an identified barrier.)

     The Illinois EPA believes that the proposed remedy's provision of both an intercept
     trench and regular monitoring of the various gas probes and wells provides a protective
     barrier to gases or other contaminants (including chlorinated solvents) that could attempt
     to migrate into the subdivision undetected. Although a geologic survey would provide
     some comfort to residents, it is very costly,  the drill rig itself could have trouble accessing
     some areas with all the homes that are now  present, possibly damaging yards or
     structures. Operating the rig so close  to homes and people presents safety concerns, and
     the findings may still not offer the assurance which the residents desire. We believe it is
     better to address any problems at the landfill source and prevent them from migrating
     rather than speculating where a problem would or would not occur if the contaminants
     were allowed to migrate.

3.    There should be more monitoring wells installed, along with a 30 to 50 year monitoring plan that has
     frequent monitoring of all contaminants, not just  methane.

     The proposed remedy provides for groundwater and soil-gas samples to be taken on a
     long-term basis. The analysis performed on the samples would detect methane and other
     contaminants associated with a landfill if present. Those sample results will be available to
     the public for examination. If contaminant levels exceeded the regulatory standards,
     actions  could be taken to address a problem until the levels were once again protective of
     human health and the environment. After an initial period of

-------
any risk above acceptable levels must be fully addressed by the proposed plan to provide
a level of protection that is both acceptable by design and by actual performance. Simply
stated, the current residents of Wycliffe Estates and the surrounding area need to be
protected from any adverse effect the landfill wastes may present that violates acceptable
standards. The proposed remedy will provide the following actions specifically tailored to
the protection of Wycliffe Estates and other area residents:

The landfill gas interceptor trench that extends along the West side of the landfill will
continue to operate as a barrier to any landfill gases trying to migrate West into the
borrow  pit area. The gas extraction wells behind the Bethany Drive homes will also
continue to operate until the presence of landfill gas has been reduced to levels that do
not pose health or flammability threats to the residents. (Note: Although the methane
levels may be reduced to 0 while the extraction wells are operating, since methane is a
naturally occurring gas in the ground it is expected return to very low levels. Regulatory
standards protect residents from the higher unacceptable levels.) Even when the
extraction wells behind the homes have completed the removal of the gases, the
interceptor trench  over at the landfill will continue to operate as a barrier designed to
prevent any recharge from the landfill. Monitoring of the systems will be required to
demonstrate their initial and continued success.

The extraction wells have performed better than anticipated for removing the methane
gas from the ground but it will require some time to remove the very last bit that is held
within some of the more tightly packed clay soils. It will also take time once the system is
shut off to demonstrate that even without the system running, homes remain protected.
As of March 2000, six weeks worth of monitoring data had been collected and it indicates
that the methane levels in both the borrow pit and the Wycliffe Estates area have been
reduced below levels of concern. The monitoring data will continue to be collected into
mid-April before a determination is made of whether the gas migration problem has been
adequately addressed. Additional monitoring will also continue to demonstrate continued
compliance and protection.

The homes that had a venting system installed on their sump pumps have been advised to
contact the MIG/DeWane landfill task force (MLTF) to settle any issues related to costs
or maintenance matters. Any issues outside the regulatory jurisdiction of the Agency's at
this site should contact the MLTF or consult with counsel about how to best resolve the
issue.

All the homes with the methane monitors/alarms will either be provided with the
necessary maintenance and calibration service to maintain those units or will be provided
with an  "all clear" statement when it is issued for the area. It is our understanding that
the Wycliffe home owners may either keep the detectors or

-------
     between two and five years, monitoring data is formally evaluated to determine if changes
     need to be made to ensure the site is in compliance. The proposed remedy also calls for
     site monitoring activities over a minimum of 30 years with a formal regulatory review at
     least every five years throughout that period. During the review process the frequency of
     sampling could be reduced but only if the review showed no need to continue the more
     frequent monitoring schedule.

4.    There should be an active gas collection system and/or numerous more passive vents installed at the
     landfill to reduce any gas that could accumulate under the proposed full cap.

     The proposed remedy mandates a system of passive vents throughout the surface of the
     landfill. The actual number of vents installed will need to satisfy an engineering design
     that shows the capability of properly venting the landfill so as to eliminate any gases from
     building up under the cap. If the  passive vents do not relieve the gases as designed, they
     can be upgraded to active vents to provide the proper collection of gases. The interceptor
     trench and six gas extraction wells behind the Bethany Drive homes are already an active
     collection system  and will be operated for as long as is necessary.

5.    Gas probes should be installed throughout the entire subdivision.

     There are currently 6 gas probes directly behind the homes along Bethany Drive and 6
     additional gas probes located in the subdivision between Bethany and Jamestown
     Avenue. The current results indicate that additional gas probes are not necessary.

6.    How do the residents know that there will not be another more serious incident?

     The mandated provisions of the proposed remedy are environmentally sound enough to
     detect an approaching problem and binding enough to provide action to be taken in a
     timely manner to  maintain the continual protection of the residents. The final remedy,
     especially for a site like MIG/DeWane landfill that has experienced a documented
     methane migration in the past, will be subject to  even closer scrutiny than a landfill that
     has not revealed such a potential to influence off-site property.

7.    Since the PRP's did not implement the gas removal system as proposed, but implemented a
     cheaper, more obtrusive system, how do we know they will implement the recommendations in the
     proposed plan?

     During the April  emergency response, the goal was to get the protective systems

-------
     operating as soon as possible. The final remedy will be outlined in a legally binding
     document that the PRP's sign called an Administrative Order by Consent (AOC). The
     PRP's must strictly adhere to the provisions of the Record of Decision (ROD) and the
     AOC or they could be subject to enforcement actions by the Illinois EPA and/or the
     U.S.EPA. During the April emergency the PRP's cooperated on a voluntarily basis and
     much of the strict authority available to the Agencies was not used.

8.    What will the Illinois EPA and U.S.EPA do to ensure that the collection system will be maintained
     until it is absolutely 100% certain that there will not be another methane or toxic gas exposure to the
     residents?

     It is not possible to provide a 100% assurance even with the system operating, but the
     highest level of certainty, safety, and precaution will be maintained on the citizens behalf
     by this Agency. We will use any provision available to us by the law to ensure complete
     and full compliance by the PRP's to maintain a system that is protective of human health
     and the environment. If for some reason the PRP's were not providing the necessary
     actions to ensure public safety according to the provisions of the proposed remedy and
     the subsequent legal documents, both the U.S.EPA and the Illinois EPA could act to
     maintain the protectiveness necessary.

9.    Can't the blower and flare that are venting the landfill gases be relocated to somewhere that the
     residents won't see, hear, or smell  any affects of it?

     The blower and flare are currently located on the Northwest corner of the landfill,
     approximately 800 feet away from the closest residence. The flare is partially obstructed
     from view by a stand of trees and since prevailing winds are to the East, it does not pose
     an odor nuisance except for a very few times each year, and those few days would not
     pose a health exposure problem. The flare is at the location that best suits the operation
     of the interceptor trench system. The noise factor will be looked into to see if the flare
     could be maintained at its current location without causing a nuisance noise problem.

10.   Given the past events where data showed a potential problem years before the emergency
     occurred, please report the status of the site's soil, gas, or water issues and all monitoring data to the
     citizens in the area on a regular basis, including any increases, decreases, spikes or trends that may
     or may not affect the residents of Wycliffe Estates.

     The Illinois EPA will commit to providing updates  of the site through the use of fact
     sheets and if requested, we can  hold public information sessions to explain and answer
     questions about the data. These could be scheduled on a regular basis as the citizens
     desire (quarterly, bi-annually, annually, etc). If the status of something changed

-------
     quickly, an urgent message about a spike or condition could be relayed through these
     same channels on an even more immediate basis.
11.   Can the final remedy be implemented on an expedited basis to provide for the immediate protection
     of the residents?

     The Illinois EPA plans to sign the Record of Decision for this site in Spring 2000.
     Following that, an Administrative Order by Consent (AOC) will be issued to ensure the
     PRP's comply by developing construction plans in 2000 with actual construction of the cap
     and remediation systems starting in 2001. The gas emergency systems that have been
     operating since April  1999  are adequately reducing the identified risks and providing for
     the protection of the residents. Those systems will continue to operate until the additional
     permanent solutions are in place or until the need for the system has been demonstrated
     not to be necessary.

12.   Since the preferred alternative is a combination of Alternatives 4 and 5 from the FFS document and
     it was not actually evaluated in the FFS document as the other alternatives were, it has been
     proposed that the preferred alternative 4A of the proposed plan be modified in the following
     manner:

       i) There should be a performance basis established for each design component of Alternative 4A.
       ii) Alternative 4A should exclude any new detailed design specifications not included in
          Alternative 4 of the FFS.
       iii) Alternative 4A should require pre-design investigations and remedial design analysis that will
          produce detailed design specifications that fully satisfy the performance basis concerns.
       iv) Alternative 4A should provide flexibility with respect to the development of the detailed design
          specifications so that the pre-design/design process can be used to optimize the performance,
          implementability, and cost effectiveness of the project.

       As an overall response to the entire comment, the Illinois EPA and the U.S.EPA agree
       that any criteria followed in the FFS to provide proper design and remedy
       implementation should also be performed on Alternative 4A. The proper steps will be
       taken to ensure that Alternative 4A is the most adequate and efficient final remedy and
       that will be documented in the same way as any of the selected remedies.

       Now, specifically responding to the individual comments.

          The Agencies agree with comment (i) and a performance based criteria may be
          incorporated were applicable  in the design component of Alternative 4A.  However,
          specific minimum  design criteria and specifications must also be incorporated into
          each component.

-------
       Comment (ii) will be considered but the request to exclude any new detailed design
       specifications not in Alternative 4 is denied. There may be the need to include these
       specifications due to performance based design parameters but they will need to meet
       the FFS criteria for evaluation if they are to be included.

       Comment (iii) will be considered but it should be noted that all aspects of this final
       remedial action will be considered time sensitive and although a proper evaluation of
       the intended remedy is necessary, the pre-design investigations and design analyses
       will have very appropriate expectations for expeditious progress.

       The goal of the Agencies is also to optimize the performance, implementability, and cost
       effectiveness of the project as mentioned in comment (iv). In that spirit, the flexibility
       realized toward that goal will be the greatest available under the law and our ability as
       Agency's  to work cooperatively with the PRP's.
                                  FUTURE ACTIVITIES

After the close of the hearing record, the Illinois EPA evaluated all comments received before
considering revisions to the proposed remedy. The remedy chosen by the Agency will be described in a
document called the Record of Decision (ROD). The ROD is signed by both the Illinois EPA and the
U.S. EPA. It is anticipated that the office of the Illinois Attorney General will negotiate a written legal
agreement called an Administrative Order by Consent (AOC) with the owners and potentially responsible
parties (PRP's) of the MIG/DeWane landfill. Besides requiring the PRP's to implement the remedy as
chosen in the ROD, the AOC will address many of the legal issues specifying the applicable state and
federal regulations the PRP's will follow when capping the landfill.

                       ILLINOIS EPA PREFERRED ALTERNATIVE

Based on the evaluation of available information, the Illinois EPA recommends Alternative 4A.

Alternative 4A;      Estimated  Cost;  $17.5 million.

Alternative 4A was not proposed directly in the FFS. It is a modification and refinement of alternative 4.
Alternative 4A involves the installation of a grading layer over the landfill side slopes, a Geosynthetic Clay
Layer (GCL) cap over the entire landfill,  a drainage layer over the entire landfill, and a I'/^-foot protective
soil layer over the GCL and drainage layer. This alternative requires the grading layer to be a minimum of
1 '/2-feet in depth, with a final protective soil layer to be 2!^-feet in depth on the crest and top of the
landfill, with a minimum layer of 2-feet of protective soil at the bottom of the side slopes.

-------
The landfill cap will conform to the Resource Conservation and Recovery Act (RCRA) requirements
which include a double barrier designed to prevent infiltration of precipitation into the waste. The major
differences between the use of clay or synthetic materials are availability, installation and cost. Material
above the double barrier (topsoil, vegetation/rooting layer, drainage layer) and below (foundation layer)
are common to all capping alternatives.

The components of storm water management, operations and maintenance, monitoring and passive gas
venting are also included in the preferred alternative. The cap design would include surface water
management features (e.g. berms, ditches,  etc.) to direct runoff away from the landfill while minimizing
erosion. The loss of soil overlying the barrier via erosion would potentially result in increased infiltration
over time. Maintenance of the cap primarily focuses on repairing damage from erosion and cap
settlement, and promoting an even growth of vegetation to stabilize the soil layers and prevent soil erosion.
A program for long-term maintenance and monitoring would be implemented as part of this alternative.
Maintenance would include regular inspections of the landfill area, repair of any damage to structures or
the soil vegetation cover, and removal of sediment from ditches  and other areas.

A system of passive vents to allow the release of gas vapors from the landfill waste would be constructed
as a part of the landfill cap and would complement the existing active ventilation systems operating at the
site.

The effectiveness of the current leachate system on the Northeastern third of the landfill has been
successful and a leachate collection system for the other two thirds of the landfill will be installed. Monitor
wells will be placed down-gradient of the landfill to monitor any leachate that is not being captured as well
as groundwater conditions.

The FFS document includes a detailed analysis of all the remedial alternatives. The evaluation process
was developed on the basis of the U.S.EPA Interim Final document "Guidance for Conducting Remedial
Investigations and Feasibility Studies" under the Comprehensive Environmental Response, Compensation,
and Liability Act (CERCLA) of 1988. That guidance document  was developed based on the statutory
requirements of CERCLA, program initiatives promulgated under the National Contingency Plan (NCP),
and experience gained in the Superfund program. This proposed remedial alternative is consistent with the
National Oil and Hazardous Substances Pollution Contingency Plan and the Comprehensive
Environmental Response, Compensation, and Liability Act.
                                    PUBLIC REPOSITORY


 All documents are currently available for viewing at:       Ida Public Library
                                                        320 North State Street
                                                        Belvidere, IL 61008

-------
Please ask for the "MIG/DeWane" repository. The library is handicap accessible and has photo copiers
available for cost.

                    DISTRIBUTION OF RESPONSIVENESS SUMMARY

Copies of this responsiveness summary will be mailed to all who registered at the July 13, 1999 hearing
and to all who submitted written comments. Additional copies of this responsiveness summary are
available from Mark Britton of the Illinois EPA-Office of Community Relations. (See below for address)
              ILLINOIS EPA STAFF WHO CAN ANSWER YOUR QUESTIONS

Please contact the following individuals if you have any questions or concerns about this site.

 Rick Lanham, Project Manager	  . Mark Britton, Community Relations Coordinator
 Illinois EPA - Bureau of Land	  . Illinois EPA - Director's Office
 1021 North Grand Avenue East	  .  1021 North Grand Avenue East
 Springfield, Illinois 62794-9276	  . Springfield, Illinois 62794-9276
 217/782-9881 	217/524-7342
                                                   E-mail: epa8134@epa.state.il.us


                            HEARING RECORD AVAILABILITY

The following items are available from the Illinois EPA hearing officer for examination and review:

    1.    Public hearing notice.
    2.    Transcript of the July 13, 1999, public hearing.
    3.    Public hearing attendance record and authors of exhibits.
    4.    Hearing record exhibit list of letters, documents and notices.
    5.    Letters, documents and notices contained in the hearing record.

             Illinois Environmental Protection Agency - Hearing officer
             1021 North Grand Avenue East
             Post Office Box 19276
             Springfield, Illinois 62794-9276

-------