EPA/ROD/R03-98/013
                                    1998
EPA Superfund
     Record of Decision:
     MW MANUFACTURING
     EPA ID: PAD980691372
     OU05
     VALLEY TOWNSHIP, PA
     12/22/1997

-------
EPA 541-R98-013

                              RECORD OF DECISION
                             MW MANUFACTURING SITE
                                  DECLARATION

    SITE NAME AND LOCATION

    MW Manufacturing Superfund Site
    Operable Unit 5
    Valley Township, Pennsylvania

    STATEMENT OF BASIS AND PURPOSE

    This Record of Decision (ROD) presents the selected remedial action for the MW Manufacturing
    Site located in Valley Township, Montour County, Pennsylvania (the Site),  developed in
    accordance with the Comprehensive Environmental Response, Compensation, and Liability act
    of 1980 as amended by the Superfund Amendments and Reauthorization Act, (CERCLA),  42
    U.S.C. °°9601 et. seg. and is consistent, to the extent practicable, with the National Oil and
    Hazardous Substances Pollution Contingency Plan (NCP),  40 CFR Part 300. This decision is
    based upon the contents of the Administrative Record for the MW Manufacturing Site.

    The Commonwealth of Pennsylvania has concurred with the selected remedy. A copy of the
    letter of concurrence is attached.

    ASSESSMENT OF THE SITE

    Pursuant to duly delegated authority, I hereby determine, in accordance with Section 106 of
    CERCLA, 42 U.S.C. °9606, that actual or threatened releases of hazardous substances from this
    Site, as discussed in Section VI  (Summary of Site Risks), if not addressed by implementing the
    response action selected in this ROD, may present an imminent and substantial endangerment to
    public health, welfare or the environment.

    DESCRIPTION OF THE SELECTED REMEDY

    The following remedy, as subseguently described, is one of five operable units that comprise a
    comprehensive remedy for the Site. Operable Unit 1 (OU-1),  completed in March 1992
    addressed carbon waste at the Site. Operable Unit 2 (OU-2)  addressed the chopped and shredded
    pieces of wire insulation (referred to as "Fluff") resulting from the copper reclamation process; it
    also addressed contaminated soils, lagoon water and containerized material on-site. OU-2 called
    for the use of on-site incineration; the remedy for OU-2 is reevaluated in this ROD. Operable
    Unit 3 (OU-3) addresses long-term contaminated groundwater impacts from the Site.  OU-3 is
    currently in design phase. Operable Unit 4 (OU-4)  consisted of the design and installation of a
    public water supply for certain residences and businesses.  OU-4 was completed in August 1996.
    The Remedial Design  (RD) for OU-2 included a series of treatability studies which were
    completed in November 1995.  The treatability studies revealed that the selected remedy for OU-
    2 has the potential for adverse impacts on human health and the environment. Operable Unit
     (OU-5) was undertaken to reevaluate the remedy for the Site contaminants previously addressed
    under OU-2. The original selected remedy  (OU-2) included the following major components:

       •      on-site incineration of Fluff,  stabilization  of ash,  and disposal of ash in an off-site
              landfill permitted pursuant to the  Resource Conservation and Recovery Act of 1976 (42  U.S.C.
              00 6901-6986)(RCRA);

       •      on-site incineration of impacted soils for  organics removal,  stabilization of metals in ash
              where necessary and, disposal of ash in an off-site RCRA landfill;

       •      on-site treatment  of lagoon water for organics  and metals and discharge  in accordance
              with Federal National Pollution Discharge Elimination System (NPDES)  and the
              Commonwealth of Pennsylvania reguirements;

       •      on-site incineration of the contents of  tanks and drums,  stabilization of the ash,  and
              disposal of the ash in an off-site RCRA landfill  and;

-------
       •       covering of the soils  under the Fluff once the Fluff has  been removed in accordance with
              RCRA Subtitle C requirements.

    The selected remedy in this ROD, referred to as OU-5, will protect the public from exposure to
    impacted soil, Fluff, lagoon sediments and water, the contents of tanks and drums located on-
    site.  In addition, the selected remedy will provide both short-term and long-term protection of
    human health and the environment.

    The elements of the selected remedy for this amended ROD (OU-5) are:

       •       Site preparation which includes temporary sedimentation and erosion control  and the
              clearing of vegetation around the Fluff and lagoon;

       •       Treatment/containment  of contaminants in Fluff,  lagoon sediment,  and surface soils
              through ex-situ stabilization and backfilling excavated areas with the stabilized material;

       •       Treatment of soil containing Non Agueous Phase Liguids (NAPLs)  utilizing low
              temperature thermal desorption;

       •       Covering the stabilized material and any other areas of concern with an EPA  and PADEP
              approved two-foot soil cover.  The cover will be graded and vegetated to prevent ponding
              and to control erosion.

       •       Site restoration by removing all debris from the  Site;

       •       Off-site transport of  materials in tanks and drums  at the Site to an appropriate facility;

       •       Draining of lagoon water,  treatment of the water  in a physical/chemical treatment process
              (if needed), and discharge of the treated water to  an unnamed tributary of Mauses Creek
              adjacent to the Site and/or to an industrial process;

       •       Implementation/enforcement of institutional controls at the Site (such as deed
              restrictions);

       •       Long-term operation and maintenance (O&M)  activities including Site security through
              the maintenance of existing Site fence.

    DECLARATION OF STATUTORY DETERMINATIONS

    The selected remedy is protective of human health and the environment, complies with Federal
    and State requirements that are legally applicable or relevant and appropriate to the  Remedial
    Action and is cost-effective. This remedy utilizes permanent  solutions and alternative treatment
    technologies to the maximum extent practicable and satisfies  the statutory preference  for
    remedies that employ treatment that reduces toxicity, mobility or volume.

    The components of the selected remedy, in conjunction with the OU-1, OU-3, and OU-4
    remedies, represent the maximum extent to which a permanent solution and treatment
    technology can be utilized in a cost-effective manner for the Site.

    Pursuant to CERCLA Section 121(c), 42 U.S.C. °9621(c), the 5-year Site reviews will apply to
    the remedial action, because this remedy will result in hazardous substances remaining on-site at
    levels that would not allow for unrestricted use of the Site.  The 5-year Site reviews  will ensure
    that the remedy continues to provide adequate protection to human health and the environment.



-------
                               RECORD OF DECISION

                          MW MANUFACTURING SITE, OU-5
                VALLEY TOWNSHIP, MONTOUR COUNTY, PENNSYLVANIA

                                DECISION SUMMARY

I.   SITE NAME, LOCATION, AND DESCRIPTION

The approximately 15-acre MW Manufacturing Superfund Site (the Site) is located in Valley
Township, Montour County, Pennsylvania, 2 miles north of Danville, 700 feet west of State
Route 54, and about E mile south of Interstate 80 (see Figure 1 for the Site location map).  The
Site is located on the Riverside USGS guadrangle map. The Pennsylvania Department of
Transportation  (PennDOT) maintains a storage area immediately north of the Site. Farmlands
and wooded lots are adjacent to the Site to the west and south. Mauses Creek flows in a
southerly direction past the Site on the west side of Route 54.

Mausdale, a residential area with approximately 24 homes, is located approximately 1/4 mile
southeast of the Site, and Danville (estimated population 5,200)  is located 2 miles south. At the
intersection of Routes 54 and 1-80, there are a number of private residences, three motels,  three
gas stations, and several restaurants. These properties, as well as a Head Start school located just
north of the PennDOT storage area, have been provided with a public water supply as their
source of potable water. The public water supply was provided as part of the remedial action for
OU-4 for the Site.

The Site is surrounded by a fence eguipped with a locked gate. Facilities located on the Site
consist of one large, inactive building which occupies approximately one acre of the property. In
addition, there is a smaller building which occupies approximately 3,350 sguare feet to the south
of the main building. The rear portion of the main building is partially collapsed. The remainder
of the Site consists of open land, above ground storage tanks, underground storage tanks,
miscellaneous drums, piles of Fluff, and a lagoon containing surface water.

II.  SITE HISTORY AND ENFORCEMENT ACTIVITIES

The Site is inactive, in part due to legal actions by the Pennsylvania Department of
Environmental Protection (PADEP).  PADEP records indicate that Mr. Allan Levin of
Doylestown, Pennsylvania, proprietor of MW Manufacturing Corporation, owned the property
from about 1966 to 1972. MW Manufacturing engaged in secondary copper recovery from scrap
wire, using both mechanical and chemical processes,  until it ceased operations. In 1972, MW
Manufacturing filed for protection under Chapter 11 of the United States Bankruptcy Code, and
the Philadelphia National Bank acguired the property.

Warehouse 81 Inc. acguired the Site in 1976. Subseguently, Warehouse 81 Inc. and Domino
Salvage, Inc. formed a limited partnership to recover wire at the Site. Records indicate that the
only activities conducted by the Warehouse 81/Domino Salvage partnership were mechanical
recovery operations. While the mechanical processes generated the largest waste piles of Fluff,
the chemical process used by MW Manufacturing generated the largest environmental impact
(the carbon waste material and the lagoons, see Figure 2).

The chemical process used a hot bath to melt the polyvinyl chloride  (PVC) plastic insulation
away from the the scrap copper wire. The high temperatures decomposed plastic insulation into
carbon, which separated out as a granular black material, and also enhanced the dissolution of
lead from the plastic insulation and copper from the metal wire.  The chlorinated solvent
tetrachloroethene (PCE) was then used to remove the residual oil from the separated copper.
These inorganic and organic compounds have been identified throughout the Site.

The mechanical process generated the Fluff waste. The Fluff waste consists of fibrous insulation
material mixed with bits of plastic and copper. Phthalate esters, copper, lead and chlorinated
solvents are all present in this Fluff waste. The source of the low levels of chlorinated solvents
in the Fluff is not clear as no solvents were used during the mechanical stripping operations.

A Potentially Responsible Party (PRP)  search was conducted for the Site. As a result of this
search, EPA determined that the previous owners and operators of the Site had gone out of

-------
business. EPA notified current owners of the Site, Michael G. Sabia and Michael G. Sabia, Jr.,
doing business as Warehouse 81 Limited Partnership, of their potential liability at the Site and
offered them the opportunity to conduct the Remedial Investigation/Feasibility Study (RI/FS),
but they elected not to participate. EPA conducted the RI/FS beginning in August 1988.
Following the completion of the RI/FS, EPA divided response actions at the Site into 5  Operable
Units. OU-1 addresses the carbon waste that has been left on-site from the copper recovery
process. In March 1989, EPA issued a ROD which selected off site incineration for the carbon
waste as the remedy for OU-1. A Special Notice Letter to conduct the Remedial Design and
Remedial Action  (RD/RA) for OU-1 was sent to Warehouse 81 on March 6, 1989. Again,
Warehouse 81 declined to participate. The excavation and off-site incineration of the carbon
waste were completed by EPA in March 1992.

Additional PRP investigations in 1992 discovered records that led to the identification of AT&T
Nassau Metals (Nassau)  and Pennsylvania Power and Light (PP&L) as additional PRPs. A
general notice letter regarding their Potential liability for the Site was sent to Nassua and PP&L
on May 19, 1992.

EPA issued the ROD for OU-2 in June 1990, this ROD addressed the Fluff, impacted soils  and
impacted lagoon water at the Site. In December 1992, Nassau petitioned EPA to reopen the
OU-2 ROD. EPA reopened the public comment period and Nassau submitted comments to
supplement their petition to reopen the ROD in October 1993. In March, 1994 EPA agreed to
consider alternatives proposed by Nassua provided that Nassua conducted a treatability study
and a Focus Feasibility Study (FFS) to reevaluate the remedial alternatives. Between 1993-
1995, Nassau undertook a series of studies to evaluate an alternate remedy for the Site. These
studies are summarized in Section IV.B of this ROD.

On June 30, 1992 EPA issued the ROD for OU-3 which addresses groundwater contamination.
By letter dated September 30, 1992, EPA sent Special Notice to Nassau, PP&L and Warehouse
81 and its general partner, Michael G  Sabia, Sr. which informed those PRPs that the EPA was
willing to enter into a federal consent decree with them to conduct the Remedial
Design/Remedial Action (RD/RA) contemplated by the OU-3 ROD. Nassua and PP&L
responded, but failed to make an acceptable good faith offer to the Agency in regard to OU-3.
Warehouse 81 and Michael G. Sabia, Sr. did not respond to the Special Notice letter. On March
31, 1993, a Unilateral Administrative Order was issued to the each PRP to conduct the RD/RA
for OU-3. Nassua and PP&L agreed to conduct the RD/RA for OU-3. During the design phase,
EPA decided to split OU-3 in to two operable units:  OU-3 and OU4.  OU-3 addresses the long-
term groundwater cleanup, and OU-4 provides public water to affected residences. The
construction of a public water supply was completed in August 1996.

III. HIGHLIGHTS OF COMMUNITY PARTICIPATION

Most of the residents who were interviewed in the Danville and Valley Township areas said that
they first became aware of the problem at the MW Manufacturing Site in March 1986. At that
time, EPA discovered lead contamination in a well near the Site. EPA noted that discovery in a
news release which was carried in the local papers. EPA also hosted a public meeting on March
11, 1986, to discuss the water situation with residents and officials. Approximately 50 people
attended the meeting. EPA supplied bottled water to the users of the well until later samples
revealed safe levels of lead in the well water. The original levels of lead have not been observed
since then and the EPA believes that any lead in the original sample may have been from lead
solder in the plumbing. Lead above the action levels has not been detected in any of the later
samples taken after the water had been run for a few minutes to flush the lines (see OU-3 ROD
section III). A continuous "Plume" of lead could not be identified as emanating from the Site to
the residential wells tested. Additionally, as part of the implementation of the OU-4 remedy,  a
public water supply has been provided to certain local residents and businesses. The existence of
these safeguards contributes to reducing concern about the Site on the part of local hotel and
restaurant owners and employees who comprise a large segment of the local business
community. The provision of a public water supply has also mitigated the concern of local
residents associated with utilizing potentially impacted private wells.

The Proposed Plan for the carbon pile remedial action (OU-1) was placed in the designated
information repository on February 24, 1989. Concurrently, a public comment period, which ran
until March 27,  1989, was announced in a newspaper advertisement. A public meeting was  held
on February 28,  1989, to present the Proposed Plan and preferred alternative for removing the

-------
carbon waste pile. Approximately twenty citizens attended as well as local township and county
officials and the media. A ROD for the carbon waste pile was signed on March 30, 1989. EPA
completed the excavation and off-site incineration of the carbon waste in March 1992.

On April 16, 1992, EPA released the Focused Feasibility Study and Proposed Plan for OU-3 for
public comment. EPA placed the Administrative Record in the Docket Room in EPA Region III
(Philadelphia)  as well as the Thomas Beaver Library in Danville, PA. EPA placed an
advertisement in three local newspapers announcing public comment period on the Proposed
Plan that ran from April 16, 1992 to May 16, 1992. EPA subseguently extended the public
comment period 30 days. A notice of the extension was advertised in two newspapers on May 29, 1992.

EPA held a public meeting on May 7, 1992 at the Montour County Court House to present the
Proposed Plan for OU-3. Approximately 60 people attended the public meeting. Comments
obtained throughout the public comment period, including the public meeting, were addressed in
the Responsiveness Summary of the ROD for OU-3. This ROD was subseguently divided in to
two operable units:  OU-3 (addressing groundwater cleanup)  and OU-4 (addressing provision for
public water supply).

As part of the design and construction activities related to the implementation of OU-3 and OU-
4, particularly the installation of a public water supply,  local officials and interested members of
the public were apprised of the status of OU-2 and OU-5.  The installation of the waterline has
facilitated the participation and cooper-ation of local officials, residents, Nassau,  EPA and
PADEP. A public ceremony was held to initiate waterline construction on October 31, 1995 and
periodic Fact Sheets have been transmitted to local businesses and residents regarding the overall
Site and particularly, the installation of the waterline.

The Remedial Investigation Report, Risk Assessment Report,  Feasibility Study Report and
Proposed Plan for OU-2 were placed in the information repository on February 19, 1990. A
public comment period was announced in newspaper advertisements on February 24, and 25,
1990. A public meeting was held on February 27, 1990, to present the Proposed Plan and
preferred alternative for remediating on-site wastes and soils. One private citizen attended, as
well as local township and county officials and the media.  In December 1992, AT&T Nassau
Metals Corp. (Nassau)  petitioned EPA to reopen the ROD for OU-2. EPA reopened the public
comment period and Nassau submitted comments to supplement the petition to reopen the ROD
in October 1993. Between 1993 and 1995, Nassau undertook a series of studies to evaluate an
alternate remedy for the Site. These studies included a Reevaluation of the Risk Assessment and
a Focused Feasibility Study which were performed and submitted to EPA on May 22, 1995.
These documents supported an alternate remedy for the Site designated as OU-5.

The Focused Feasibility Study Report, Treatability Study Report, Reevaluation of the Risk
Assessment Report, Proposed Plan and other documents prepared to support the remedial action
for OU-5 were placed in the information repository on August 8, 1997.  A public comment
period was announced in a newspaper advertisement on August 11, 1997.  A public meeting was
held on August 20, 1997 to discuss the proposed remedial action. Approximately 20 people
attended the public meeting. Response to public comment can be found in the Responsiveness
Summary at the end of this document.

Based on the aforementioned community relations activities EPA has met the public
participation reguirements of Sections 113(k)(2)(b)(iv) and 117 of CERCLA.


IV.  SUMMARY OF SITE CHARACTERISTICS

A.   Site Geology and Hydrogeology

1.   Site Geology

The Site lies within the Valley and Ridge physiographic province of the Appalachian region.
The province is dominated by tightly folded mountains that create alternating valleys and ridges.
While valley floors and ridge tops may be flat locally, bedrock generally consists of layered
seguences of sedimentary rock dipping at angles up to 40 degrees. Late Pleistocene glacial
events have covered the bedrock in some areas with till that ranges in thickness from zero to 40 feet.

-------
At the Site, 8 to 26 feet of unconsolidated clay, silt, sand, gravel and boulders overlie a
predominantly shale and limestone bedrock. Bedrock in the region of the Site consists of mainly
silt, shale and limestone units of Upper Silurian/Lower Devonian age. In descending order (top
to bottom) the bedrock units are the Tonoloway Formation, the Wills Creek Formation, and the
Bloomsburg Formation. The contact between the Tonoloway Formation and the Wills Creek
Formation is reported to occur in the northern portion of the Site over a transition interval greater
than 200 feet. In the southern portion of the Site,  bedrock comprises the Upper and Lower Wills
Creek Formations. These units are dominated by alternating beds of limestone and clastic and
calcareous shale.

Bedrock underlying the Site is moderately fractured, with prominent fractures present in the
bedrock at depths less than 100 feet. Fractures occur less freguently with increasing depth, which
is indicative of decreasing permeability with depth. Fractures are generally oriented parallel to
bedding and dip to the northwest.

2.   Site Hydrogeology

In the overburden deposits at the Site, groundwater is generally present at depths ranging from
10 to 20 feet below ground surface. Groundwater flow in the overburden is generally eastward,
toward Mauses Creek.

In the bedrock aquifer, groundwater occurs primarily in secondary porosity structures such as
fractures and bedding planes. Groundwater flow in the shallow, intermediate and deep bedrock is
generally eastward, toward Mauses Creek. Data indicate that the different geologic formations
that compose the bedrock behave as one hydrastratigraphic unit.

Groundwater flow at the Site is naturally constrained to a narrow flow path discharging into
Mauses Creek rather than dispersing over a large area off-site. Along the southern boundary of
the Site, groundwater flow has a northern component, and then flows northeast and east toward
Mauses Creek. Groundwater across the north Site boundary flows to the east, toward the
discharge point at Mauses Creek. Vertical gradients are generally downward in the overburden
and upward in the deep bedrock, creating a natural hydraulic barrier at depth.

B.   Summary of the Previous Investigations and Findings

A number of environmental activities have been performed at the Site by EPA and Nassua in
connection with OU-2 and OU-5, including:

          OU-2 Remedial Investigation/Feasibility Study (EPA) ;
   •      OU-2 Pre-Design Investigations (performed  by Weston for EPA under a contract with
               US Army Corps of Engineers (ACOE));
          OU-2 Remedial Design activities (EPA/ACOE);
   •      OU-5 Fluff Leachability testing (Nassau);  and
   •      OU-5 Supplemental Site Characterization (Nassau);
   •      OU-5 Re-Evaluation of Risk Assessment (Nassau);  and
   •      OU-5 Focused Feasibility Study including two supplements (Nassau);   and
          OU-5 Treatability Study (Nassau).

1.   Remedial Investigation

EBASCO (and its subcontractor NUS) conducted the RI for OU-2 at the Site on behalf of EPA.
RI field sampling activities began in May 1988. In addition to the field sampling and analyses, a
risk assessment was also conducted by NUS as part of the RI. The RI results were presented in
the Final Remedial Investigation Report dated July 1989;  this was subsequently amended as the
Revised Final RI Report dated April 1990.

The results of the RI are summarized below:

   •      During the course of the RI,  a number of areas were identified and sampled to determine
          whether they were sources of chemical constituents detected in the environment and/or
          presented a potential risk to human health.  These areas included several piles of  Fluff,
          eighteen (18) drums and barrels at various locations throughout the Site,  three storage
          tanks, a lagoon,  and a pile of carbon waste. These areas are shown in Figure 2.

-------
   •       The primary chemicals  of interest (COIs)  detected in water at the Site were volatile
          organic compounds (VOCs)  (primarily PCE),  while bis(2-ethylhexyl) phthalate (BEHP),
          polychlorinated biphenyls (PCBs), copper,  lead and di-n-octyl phthalate were the primary
          COIs in the Fluff.

   •       The Fluff contains  high levels  of BEHP,  di-n-octyl phthalate,  copper,  antimony and  lead;
          moderate levels of  PCBs;  and low levels  of VOCs.  The carbon waste contained numerous
          VOCs at high levels.  In light of these findings,  the Fluff was determined to be a source of
          the BEHP, di-n-octyl  phthalate,  copper,  antimony and lead detected in soils, and the
          carbon waste was interpreted to be a source of the VOCs in groundwater at the Site.

          Materials in drums  present at the Site were similar in composition to the carbon waste,
          but the volume of drummed material was small in comparison to the total volume of
          carbon waste. Carbon  waste was  addressed as a separate operable unit  (OU-1) and was
          been removed from the Site in a remedial action performed by EPA.

   •       The surface soil samples  collected near  the Fluff and carbon waste piles generally
          contained higher concentrations of contaminants than soil samples collected elsewhere at
          the Site. Surface soils throughout the Site contained BEHP,  PCE,  lead, antimony and
          copper. The presence  of these constituents is considered to be indicative of on-site
          erosion of the Fluff/carbon waste, or of prior bulk movement of the wastes. Soils beneath
          the Fluff/carbon waste piles were not sampled.

   •       Subsurface soil samples collected in the northern portion of the  Site (in the Fluff/carbon
          waste/lagoon area)  contained the same COIs. In some borings, Fluff was reported to
          constitute the upper  few feet of the sampled column.  In general,  evidence of Fluff
          presence in the samples collected below  two feet decreased significantly. One boring,
          located near the northwestern comer of the building,  apparently penetrated a former
          lagoon. Elevated concentrations of PCE were reported throughout the soil column in  that  area.

   •       Soil contamination  from VOCs and inorganic constituents is randomly scattered
          throughout the southern portion of the Site. In some areas of the Site,  soils containing
          elevated concentrations of VOCs were observed only in the lower intervals of the soil
          borings,  at the water table. In these cases, the presence of VOCs was attributed to
          groundwater transport from a source area,  rather than indicating downward migration of
          VOCs from the ground  surface in the immediate vicinity of the sampling location.

   •       The on-site monitoring wells downgradient of the  identified source areas contained
          elevated concentrations of VOCs.  The well cluster closest to the carbon waste pile
          displayed the highest VOC concentrations.  Well monitoring of both the overburden and
          the bedrock units displayed VOC concentrations in this area.

2.    OU-2 Feasibility Study

The Feasibility Study for OU-2  was completed by NUS on behalf of EPA in November, 1989.

The alternatives evaluated by the EPA, as presented in the Feasibility Study, include:

   •       No action;

   •       On-site disposal of Fluff waste in a RCRA hazardous waste landfill,  on-site
          physical/chemical treatment of  soils with on-site landfill disposal, cap closure over
          RCRA units;

   •       Off-site disposal of  Fluff waste in a RCRA hazardous  waste landfill, on-site
          physical/chemical treatment of  soils with off-site landfill disposal,  cap closure over
          RCRA units;

   •       On-site incineration,  cap closure over RCRA units;

   •       Off-site incineration,  cap closure over  RCRA units; and,

-------
   •       Off-site incineration of Fluff waste,  on-site physical/chemical treatment of soils with off-
          site landfill disposal,  cap closure over RCRA units.

Based on the results of the RI/FS, EPA selected the following remedy for the Site as documented
in the ROD issued June 29, 1990:

   •       on-site incineration of  Fluff and stabilization of ash and disposal in an off-site RCRA
          landfill;

   •       on-site incineration of  impacted soils for organics removal,  stabilization of metals where
          necessary and,  disposal  in an off-site RCRA landfill;

   •       on-site treatment of lagoon water for organics and metals and discharge in accordance
          with Federal NPDES and the Commonwealth of Pennsylvania reguirements;

   •       on-site incineration of  the contents of tanks and drums and,  stabilization of the ash and
          disposal in an off-site  RCRA landfill and/

   •       covering of the soils under the Fluff once the Fluff has been removed in accordance with
          RCRA Subtitle C reguirements.

3.   OU-2 Pre-Design Investigations

Several predesign investigation efforts have been conducted for OU-2 at the Site. These
activities and the results are summarized in the following sections.

a.   Weston Pre-Design Investigation

Weston was contracted by ACOE to conduct predesign activities on behalf of EPA. Predesign
activities included field investigations such as treatability study sampling, surveying, and
geochemical and geotechnical subsurface soil sampling. In addition, two treatability tests were
completed, including a muffle furnace test and a rotary kiln simulator pilot-scale test. Weston
completed the following field activities in October, 1991:  installation of 19 geochemical soil
borings and the collection of 50 soil samples; installation of 13 geotechnical soil borings and the
collection of 14 treatability study samples; and surveying of surface and subsurface features.

The Weston predesign field investigation was used to provide data on the characteristics of Fluff
and Site soils for muffle furnace and pilot-scale rotary kiln studies.  Through the predesign
investigations, Weston identified similar constituents in the Fluff, and surface and subsurface
soils at the Site. However, the Fluff contained PCE and BEHP concentrations which were an
order of magnitude less than the respective average concentrations of these constituents
identified in the Fluff during the RI. In addition, concentrations of di-n-octyl phthalate and
copper were approximately three times less than the average concentrations of these constituents
identified during the RI.

The results of the pilot-scale rotary kiln treatability study detected dioxins and furans in bottom
ash,  flue ash, and flue gas samples. Weston indicated that increased operating temperatures in
the kiln and secondary combustion chamber might be necessary to prevent the formulation of
dioxins/furans in the bottom and flue ash. In addition, the rotary kiln simulator testing indicated
that the baghouse filter capture efficiencies for particulates and inorganic constituents were
lower than expected due to the high fraction of small particles in the waste streams.

b.   EPA Pilot-Scale Incineration Testing

EPA and ACOE reguested that a pilot-scale test program be conducted at the EPA' s Incineration
Research Facility in Jefferson, Arkansas to support evaluation to the suitability of incineration at
the Site. The objective of the additional pilot-scale testing was to conduct testing on a larger
scale, which would be more representative of the size of incinerator proposed to be used at the
Site, in order to provide flue gas emission and ash residue characteristic data. The data from this
study confirmed the formation of dioxin.

The major conclusions of the pilot-scale incineration testing include the following:

-------
   •       kiln-ash discharge from the incineration of both Fluff and soils is dioxin-contaminated
          and requires management as a dioxin-contaminated material;

   •       flue gas particulate collected as baghouse ash is a cadmium and lead-contaminated
          toxicity characteristic hazardous waste and requires management as a hazardous waste; and

   •       Dioxins were generated during the incineration of Fluff and may pose a human health risk.

C.   Synthetic Precipitation Leaching Procedure  (SPLP) Testing for Fluff

McLaren/Hart on behalf of Nassau conducted SPLP testing on the Fluff for Semi-VOCs
(SVOCs),   (particularly BEHP). This was done because during the RI concentrations of BEHP in
the Fluff were measured in the percent range. Given the extremely high concentrations of BEHP
measured in the Fluff and the relatively high levels of BEHP in plastic when used as plasticizers,
it was hypothesized that BEHP detected in the Site soil is simply a constituent of the original
plastic portion of the cable product contained in the Fluff rather than leaching of BEHP. The
leaching test data are presented in the Fluff Leachability Testing Summary Report dated August
1994 submitted to EPA and PADEP.

The findings of the leaching test indicate that the amount of phthalate compounds released to the
environment from the plastic portion of the Fluff under Site conditions is likely to be extremely
low.  The Fluff primarily consists of plastic, and the plastic contains high concentrations of
BEHP, and other phthalates. However, under normal site degradation and weathering
conditions, as simulated in the leaching test, the phthalate compounds do not readily leach from
the Fluff. This testing indicated that the leaching of SVOCs from the Fluff is apparently not
occurring under normal Site weathering conditions. The groundwater monitoring results
confirmed this hypothesis. The phthalate were not found in appreciable amount in the
groundwater samples (see table 2 of OU-3 ROD). In conclusion although the phthalates are
present in percentage range in the Fluff, they do not leach to the groundwater from the Fluff.

4.   OU-5 Supplemental Site Characterization

McLaren/Hart conducted a field investigation of the Site on behalf of Nassau to obtain additional
data for the re-evaluation of the remedial alternatives considered in OU-2. The field work was
completed in July 1994. The purpose of the supplemental sampling and characterization was to
obtain additional data to design treatability studies and reevaluate alternatives. The supplemental
characterization also provided more recent data on COI and an updated estimate of the Fluff
volume. Details regarding the Supplemental Site Characterization work are provided in the
Supplemental Site Characterization Report dated October 1994 submitted to EPA and PADEP.

The configuration of one of the Fluff piles had changed between topographic surveys conducted
in 1986 and 1992. This Fluff pile appeared to have been reworked into two mounds, with some
material located between the mounds in a relatively level area. However, it did not appear that
there was any mixing of Fluff and the underlying soils prior to the reworking of the pile.
McLaren/Hart estimated the Fluff volume on-site to be approximately 30,000 cubic yards, which
was comparable with the 32,000 cubic yard estimate presented in the OU-2 RI report.

The Fluff contained similar VOCs to those identified during the OU-2 RI. The maximum PCE
concentration detected during the Supplemental Site Characterization investigation (146.5
mg/kg) was almost an order of magnitude higher than the maximum PCE concentration detected
in the Fluff during the RI  (18 mg/kg). The average PCE concentration detected was 17.2 mg/kg.
The concentrations of VOCs in the Fluff varied a great deal both vertically and laterally in each
of the Fluff piles. There was no obvious pattern to the distribution of VOCs; either by depth or
location. The source of VOCs in Fluff is unknown.

The Fluff was also analyzed for PCBs. Four PCB Aroclors were identified in the Fluff samples:
Aroclors 1242,1254,1260, and 1268. The concentration of total PCBs in the Fluff samples
ranged from 1.2 to 162 mg/kg, with an average of approximately 49 mg/kg. The maximum PCB
(total) concentration detected during the Supplemental Site Characterization exceeded the
maximum concentration detected in the Fluff during the RI.

The soils beneath and adjacent to the Fluff piles were sampled and were found to contain
primarily PCE and TCE. The presence of these VOCs was not laterally continuous across the

-------
Fluff pile area.

Subsurface soils in areas of the Site with no visible Fluff were also sampled and analyzed for
VOCs. The most frequently detected VOC in these locations was PCE, at concentrations
ranging from 4 to 180,000 ug/kg, with an average of approximately 11,000 ug/kg.

5.   OU-5 Focused Feasibility Study  (FFS) and FFS Supplement

A Focused Feasibility Study was completed by McLaren/Hart on behalf of Nassau in May, 1995.

The alternatives evaluated, as presented in the Focused Feasibility Study, include:

1.   No Action;
2.   Surface Capping;
3.   Ex-Situ Stabilization/Vapor Phase Carbon Treatment, Low Temperature Thermal
      Desorption (LTTD)  of NAPLs and a Soil cover;
4.   Soil Vapor Extraction/Bioventing, Surface Capping;
5.   Soil Vapor Extraction/Bioventing, Ex-Situ Stabilization, Surface Capping;
6.   LTTD, Surface Capping;
7.   On-Site Incineration, Stabilization and Off-Site Disposal of Ash, Surface Capping;
8.   Off-Site Incineration, Surface Capping.

Alternatives given in bullets 2 to 8 above have common elements as follows:

   •      Site preparation which includes temporary sedimentation and erosion control and the
          clearing of vegetation around the Fluff and lagoon;

   •      Off-site  transport of materials in tanks and drums at the Site to an appropriate facility;
   •      Draining  of lagoon water,  treatment of the water in a physical/chemical treatment process
          (if needed),  and discharge of the treated water to an unnamed tributary of Mauses Creek,
          adjacent  to the Site and/or to an industrial process;

   •      Long-term operation and maintenance (O&M)  activities,  including Site security through
          the maintenance of existing Site fence; and

   •      Implementation/enforcement of institutional controls at the Site (such as deed
          restrictions).

The results of the FFS evaluation are summarized in Section VII of the ROD.

In June 1996, as part of the Pre-Design Investigation for OU-3, a GeoProbe Investigation was
conducted at the Site.  The objective of the GeoProbe Investigation was to collect groundwater
quality data in the overburden to evaluate the nature and extent of impacts from potential source
areas.

Field observations for soil indicated the presence of residual and pooled non-aqueous phase
liquid  (NAPL). Although these areas of pooled NAPL were primarily identified below the water
table (and therefore, are subject to OU-3), one area immediately south of the main building
NAPL in overburden soils. This area  (approximately 225 cubic yards (CY)) was identified as
appropriate for inclusion in the OU-5 remedial action due to finding of NAPL. The presence of
NAPLs in soil poses a principle threat to the groundwater.

The results of the FFS Supplement evaluation are summarized in Section VII of the ROD.

6.   OU-5 Treatability Study Report

A Treatability Study was conducted to evaluate the potential feasibility of ex-situ stabilization of
Fluff and impacted soils.

The primary objectives of the Treatability Study were as follows:

   •      Identify  the  appropriate ratio of solidification/stabilization mixing reagents that meet  the
          analytical and physical treatability test objectives;

-------
   •      Identify key process parameters such as mix/cure time,  critical analytes that may exhibit
          limitations during solidification/stabilization handling and procedures;

   •      Provide data necessary to scope,  cost and implement full-scale treatment using the
          solidification/stabilization technology; and,

   •      Provide additional leaching data on untreated and treated Site materials using the
          Synthetic Precipitation Leaching Procedure (SPLP) and using Toxic Chemical Leaching
          Procedure (TCLP).

The results of the treatability study are reported in the Treatability Study Report submitted to the
EPA in May 1996. The results of this Treatability Study indicate that the use of a 10% Type I
Portland Cement mix design on a combined soil and Fluff matrix will provide a physically strong
and relatively impermeable matrix which would be a viable remedial action for the Site.

V.  SCOPE AND ROLE OF RESPONSE ACTIONS

The remedial action at this Site has been divided into five operable units; OU-1  (carbon waste
pile remediation), OU-2  (on-site incineration of wastes and impacted soils),  OU-3  (groundwater
remediation) OU-4  (installation of a public water supply) and OU-5 (re-evaluation of OU-2 remedy).
The principal threat to human health and the environment at the Site addressed in OU-5 is from
the direct contact with PCE, BEHP, PCBs, and metals including lead, antimony and copper. The
principle threat to groundwater is from presence of NAPLs in soils. The remedy which is the
subject of this ROD is being implemented to protect human health and the environment by
preventing direct contact with Fluff and impacted soils and reducing further migration of
contaminants into the groundwater. In addition the remedy will address the principle threat to the
groundwater. This remedy addresses the following areas: four wire-Fluff waste piles, impacted
soils, lagoon water and sediments, soils with NAPLs, drums and storage tanks. The remedy is
consistent with Section 300.430(a)(1) of the National Contingency Plan  (NCP).

VI.  SUMMARY OF SITE RISKS

This section of the ROD summarizes the results of the human health risk assessment which was
performed during the RI/FS.  The baseline risk assessment provides the basis for taking a
response action and indicates the exposure pathway(s) that need to be addressed by the remedial
action. It also details the potential risks related to the no-action scenario.

A.   Baseline Risk Assessment

As part of the comprehensive assessment of the remedy for OU-2, a human health risk
assessment was performed during the RI/FS. MacLaren and Hart on behalf of Nassau performed
a re-evaluation of the risk assessment. The re-evaluation of the risk assessment incorporated
certain site-specific exposure and environmental guality data, as well as current chemical-
specific toxicity information, scientific approaches, and EPA guidance. The risk assessment
included several tasks for the media of interest at the Site including: 1) identification and
quantification of chemicals which could potentially impact human health; 2) comparison of these
chemical concentrations to background levels and to risk-based screening concentrations to
determine the COIs on-site,  3) identification and guantification of the potentially exposed
populations; 4) identification of complete exposure pathways; 5)  derivation of potential
contaminant intakes for each exposure pathway; and 6) comparison of predicted chemical
exposures to available toxicological information, in order to derive estimates of noncarcinogenic
hazards and carcinogenic risks potentially posed to each population group.

EPA requires a remedial action at a site when the carcinogenic risk level exceeds 1 x 10 -4, or in
other words, when there is a probability of one additional case of cancer in a population of
10,000 exposed to Site contaminations. The potential for health effects resulting from exposure
to noncarcinogenic compounds is evaluated by comparing an estimated daily dose presented by
Site conditions to an acceptable level. If this ratio exceeds 1.0, there is a potential for impact
based on hazards from that particular compound. These ratios can be added for exposure to
multiple contaminants. The sum, known as the Hazard Index  (HI), is not a mathematical
prediction for the severity of toxic effects, but rather a numerical indicator of the transition from
acceptable to unacceptable levels. Higher HI generally indicates greater adverse health effect.

-------
The conclusions of the Risk Assessment related to human health and the environment are
presented below.

Current Land Use - Currently the Site is vacant. Individuals who could currently be exposed to
contaminants at the Site include:  trespassers and residential communities downwind of the Site.
The baseline risk assessment found that Site contaminants currently do not pose an unacceptable
health risk to any of these individuals.

Future Land Use - A Re-Evaluation of Risk (April 1996) was performed for this Site. In this re-
evaluation new toxicity information was incorporated into the risk analysis. However,  the Site
risk was determined for a potential resident, while in fact, the Site has been classified and zoned
for industrial use only. Therefore, Site risks and cleanup levels were recalculated by EPA using
an industrial worker scenario. The contaminant concentration data used in these analyses can be
found in the RI (July 1989).  The analytical data found in the Revised Final Remedial
Investigation Report (1990) may differ from that found in the Supplemental Site
Characterization report. Generally, the contaminants levels found during the Supplemental Site
Characterization activities are higher than the levels found during the RI. Table 1 summarizes
the potential carcinogenic and noncarcinogenic risk to future industrial use of the Site and
exposed to the Fluff pile and soil.

                                  Table 1
              Summary of Site Risks to Future Industrial Workers
 Media

 Fluff Waste

 Soil

 Total Risk
Carcinogenic Risk

   7.8 x 10 -3

   6.3 x 10 -5

   7.8 x 10 -3
Noncarcinogenic Risk (HI)

          87.0

           1.2

          88.2
B.   Remedial Cleanup Action Levels

It should be noted that seventeen PCBs samples of Fluff collected during the RI yielded a PCB
concentration range of 1 to 18 mg/kg with an average of 9 mg/kg. Six PCBs samples of Fluff
collected during the Supplemental Site Characterization revealed a PCB concentration range of
1.2 to 162 mg/kg with an average of 49 mg/kg. The combined weighted average based on the
number of samples collected during the RI and Supplemental Site Characterization is 19 mg/kg
which is less than Toxic Substance Control Act (TSCA) regulated level of 50 mg/kg and,
therefore, TSCA reguirements do not apply. Also,  the EPA Office of Solid Waste and
Emergency Response (OSWER)  directive 9355.4-01 states that, for an industrial setting, material
containing PCBs two to three order of magnitude above site specific action levels constitutes a
"principle threats" and must be addressed as such. For this Site, this translates into PCBs levels
above 1000 mg/kg. The concentration of PCBs found at this Site are an order of magnitude less
than 1000 mg/kg, and, therefore, there is no "principle threat" at the Site due to PCBs. PCBs
were used as plasticizer in the wire insulation material and they are imbedded in the plastic
matrix of the Fluff.  The groundwater does not have detectable levels of PCBs indicating that
PCBs in the Fluff are not leaching to the groundwater. Also,  the leachability test on Fluff did not
show any leachable PCBs. The following table gives remedial action levels based on the future
industrial land use scenario considering three pathways i.e., dermal, inhalation and ingestion.

-------
                               Table 2
                     Remedial Actions Levels  (RALs)

   Contaminants                    Soil, Fluff and Lagoon Sediments

                                RALs based on             RALs based on      RALs based on
                              Carcinogenic Risk          Noncarcinogenic     EPA Directives

                             10 -4           10 -6             (HI)
         BEHP            34,800 mg/kg      348 mg/kg
        PCBs 1                                                                  10 mg/kg
        Lead 2                 -                                               1000 mg/kg
       Antimony                -               -            65 mg/kg
        Copper                 -               -          27,684 mg/kg
 di-n-octyl phthalate          -               -           1828 mg/kg
         PCE               375 mg/kg       3.75 mg/kg
1 Recommended cleanup levels for PCBs are 10 mg/kg for an industrial use (OSWER Directive 83554-01)
2 Recommended screening levels is level of 1000 mg/kg for an industrial use  (OSWER Directive #
  9355.4-12)

Based on information collected at the Site and the recommended cleanup levels, estimates of the
volume of materials which need to be addressed under OU-5 are as follows:

   •      Lagoon water - 301,000 gallons

   •      Tanks and drums - 40 cubic yards

          Fluff waste - 32,000 cubic yards

   •      Soils and sediments - 6,895 cubic yards

   •      Soils containing NAPL - 225 cubic yards.


VII. DESCRIPTION OF ALTERNATIVES

The Superfund process requires that the alternatives selected to address a site meet several
criteria. The alternative must be protective of human health and the environment and comply
with ARARs. Permanent solutions to environmental problems should be developed whenever
possible. The solutions should also reduce the volume, toxicity and mobility of the
contaminants.

The FFS identified and evaluated a variety of technologies and alternatives to determine if they
were capable of being protective of human health and the environment and complying with ARARs.

All costs and other considerations specified below are scoping estimates based on best available
information. Present-worth is defined as the total cost of implementing the remedy including
capital costs, and operation and maintenance costs of the remedial action for a period of 30 years.

Subsection A,  below, discusses a Baseline No Action Alternative. Then, seven other alternatives
are discussed  (Subsection B). As certain elements are common to all seven alternatives, these
common alternatives are discussed first. The alternative originally contemplated in the June 29,
1990 ROD for OU-2 is also evaluated.

A.   Baseline Alternative No Action

Estimated Capital Cost:                       $0
Estimated Annual O&M Cost:                 $55,000
Estimated Present-Worth Cost:             $845,460

The No Action alternative is considered in the detailed analysis to provide a baseline against
which the other remedial alternatives can be compared. This alternative involves taking no
further action at the Site to remove, remediate, or contain the Fluff, impacted soils or lagoon

-------
water associated with OU-5.

Implementation of this alternative would not achieve remedial action objectives and would not
reduce the migration of COIs into the groundwater. There are no major implementability
considerations associated with this alternative. Since this alternative would result in wastes
remaining on-site, five year site reviews would be reguired to monitor the effectiveness of this
alternative.

The costs associated with this alternative are Site maintenance and repair costs.


B.   Elements Common to the Remaining Alternatives

Estimated Capital Cost:                     $166,802
Estimated Annual O&M Cost:                   $55,000
Estimated Present-Worth Cost:               $1,012,262

The following common elements are included in each of the subseguent remedial alternatives
that were evaluated:

   •      Site preparation which includes temporary sedimentation and erosion control  and the
          clearing of vegetation around the Fluff and lagoon;

   •      Off-site transport of materials in tanks and drums at the Site to an appropriate facility;

   •      Draining of lagoon water,  treatment of the water in a physical/chemical treatment process
          (if needed),  and discharge of the treated water to an unnamed tributary of Mauses Creek,
          adjacent to the Site and/or to an industrial process;

   •      Long-term operation and maintenance (O&M)  activities,  including Site security through
          the maintenance of existing Site fence; and

   •      Implementation/enforcement of institutional controls at the Site (such as deed restrictions)

B.I   Alternative 1 - Surface Capping

 Estimated Capital Cost:                    $1,596,354
 Estimated Annual O&M Cost:                    $12,000
 Estimated Present-Worth Cost*              $2,793,080

* Cost includes common elements

This alternative consists of the consolidation and regrading of lagoon sediment, Fluff and surface
soil, and the installation of a surface cap meeting RCRA Subtitle C reguirements over the
regraded material. The common elements previously described would also be implemented.

For this alternative, the lagoon sediment would be excavated and consolidated with the Fluff
piles. The Fluff piles would be regraded and compacted to form a stable surface with suitable
slopes, and a RCRA Subtitle C cap would be installed over the Fluff/sediment/soils. The cap
would cover an area of approximately 8 acres.

The deed restrictions included in the common elements would serve to prohibit future use of the
property which might compromise the integrity of the cap. Site security measures (also a
common element) would be maintained to prevent inadvertent damage to the cap by trespassers.

Implementation of this alternative would result in effectively reducing the infiltration of
precipitation, thus mitigating the potential for the migration of COIs to the groundwater. In
addition, placement of the cap would eliminate potential exposure pathways including dermal
contact, runoff, and wind dispersion.

B.2   Alternative 2 - Ex-Situ Stabilization/Vapor Phase Carbon Treatment/Low
      Temperature Thermal Desorption

-------
Estimated Capital Cost:                    $6,924,062
Estimated Annual O&M Cost (Years 1-2):      $346,203
Estimated O&M Cost (Years 3-30):            $ 12,000
Estimated Present-Worth Cost*:             $8,752,530

* Cost includes common elements

This alternative involves the treatment/containment of COIs in Fluff,  lagoon sediment,  and
surface soils through ex-situ stabilization,  followed by Site restoration and placement of a two-
foot soil cover. The RCRA Subtitle C cap need not to be placed over the backfilled area as the
stabilized waste will provide eguivalent performance. Fluff was reported to constitute the upper
few feet of the soil column underneath the Fluff, this remedy calls for excavating down to two
feet of the soil underneath the Fluff. The common elements would also be implemented

Site preparation would involve the leveling of the Fluff area and spreading the Fluff to a uniform
depth. Fluff, lagoon sediments, and two feet of soils underneath the Fluff would be excavated
and stockpiled for subsequent stabilization.

The excavation activities would occur inside a temporary, moveable structure intended to
prevent the introduction of precipitation into the excavation and to control dust and VOC
emissions. All material would be stockpiled and treated in a staged treatment area. The
structures would be operated under slight negative pressure, and the exhaust air flow would be
routed through a vapor-phase carbon adsorption unit.

Excavation would be performed at a rate necessary to provide a stockpile of materials sufficient
to support three to five days of treatment (approximately 750 to 1,250 cubic yards).  Based on
the treatability study results, stabilization would be performed by mixing the materials with 10%
Type I Portland Cement. Following mixing, the resulting slurry would be placed into the
excavation and allowed to cure. Excavation activities would continue on the remaining trenches
within the excavation structure. Once all materials are treated within the excavation structure,
the structure would be moved to the next excavation area.

The excavated areas would be backfilled with the stabilized material in a manner intended to
promote drainage following curing of the stabilized materials. ITic surface soil inside the current
fenced area will be covered, with a two foot layer of soil and vegetated to prevent ponding of
liquids and to minimize erosion. All the surface soils having contaminants levels above the
RALs in the excavated area will be covered to eliminate the direct contact threat.

The resulting fixed/stabilized solid matrix will minimize the potential migration of COIs to
groundwater; the stabilization process and subsequent soil cover also would prevent direct
contact. The potential for uncontrolled volatile and dust emissions would be mitigated through
the use of the temporary structures covering the excavation and stockpile/process areas.

The presence of NAPLs in overburden soils would be treated through the use of low temperature
thermal desorption (LTTD).  The area identified contains approximately 225CY of soil
containing NAPL. The extent of this area and the total volume of soil treated with LTTD would
be subject to change if new discoveries of NAPLs in soil are made during the implementation of
the remedial action.

LTTD can effectively remove NAPL from the soil by heating the soil under vacuum conditions
to induce volatization. The optimal temperature and pressure will be determined during a pre-
design treatability study.  The soils treated by LTTD will be backfilled into the excavations (with
prior stabilization,  if necessary).

B.3  Alternative 3 - Soil Vapor Extraction/Bioventing, Surface Capping


 Estimated Capital Cost:                     $8,697,147
 Estimated Annual O&M Cost  (Years 1-2):      $ 175,000
 Estimated O&M Cost (Years 3-30):             $ 12,000
 Estimated Present-Worth Cost*              $10,210,034

*Cost includes common elements

-------
This alternative consists of the installation of an SVE/bioventing system in the targeted soil and
Fluff areas for remediation of volatile and some semi-volatile COIs through vapor extraction
and biological treatment. Lagoon sediments would be excavated and consolidated with soils and
Fluff in the area of the SVE/bioventing system. The common elements would also be implemented.

Soil and Fluff would be graded to a level surface.  Extraction/injection wells and the associated
piping for the vapor extraction and air/nutrient addition systems would be installed following
grading activities. The area to be addressed by the SVE/bioventing system would be
approximately 4.5 acres. Assuming a 10 foot radius  of influence for soils, the number of
extraction wells is estimated to be 90. Therefore,  a total of 90 extraction wells are assumed for
this remedial alternative. The final configuration of the SVE/bioventing system would be
determined during the remedial design phase. Injection of oxygen into the soils would be
accomplished by closing specific extraction wells to allow for a passive injection system. A 10-
mil High Density Polyethylene (HDPE) cover would be installed and secured over the area to be
treated to prevent "short-circuiting" of the air flow. Portable blowers would be installed, and
off-gas would be passed through vapor-phase activated carbon canisters.

Following completion of the SVE/bioventing organic constituent treatment cycle (assumed to be
two years), the synthetic cover and process unit components (e.g., wells, piping, etc.)  would be
removed, and the treated materials would be regraded and compacted to form a stable surface
with suitable slopes. A RCRA Subtitle C cap would then be installed over the area to prevent
surface water infiltration. The cap would cover approximately 8 acres.

Through the combination of the treatment of organic constituents and the use of surface capping
to address residual COIs not treated through the SVE/bioventing process  (i.e. metals),  this
alternative would be effective by eliminating the direct contact pathway, as well as mitigating
the potential for migration of COIs from soils to groundwater. With proper routine maintenance,
the cap would remain reliable and effective in the  long-term.  Excavation/grading activities
would increase the short-term potential for exposure, as well as the potential for exposure, as
well as the potential for migration of COIs from these areas.  These short-term exposures from
COIs could be mitigated during excavation/grading activities through the implementation of
conventional health and safety technigues, as well  as dust and erosion/runoff controls.

B.4   Alternative 4 - Soil Vapor Extraction/Bioventing,  Ex-Situ Stabilization, Surface Capping

Estimated Capital Cost:                     $12,030,443
Estimated Annual O&M Cost  (Years 1-2):      $   175,000
Estimated O&M Cost (Years 3-30):            $    12,000
Estimated Present-Worth Cost*:              $13,543,330

*Cost includes common elements

This alternative represents a combination of Alternatives 2 and 3. The ex-situ stabilization
technology of Alternative 2 would be employed following the completion of the SVE/bioventing
organic constituent treatment cycle of Alternative  3, in order to address any residual COIs. The
RCRA Subtitle C cap need not to be placed over the  backfilled area as the stabilized waste will
provide eguivalent performance.  Fluff was reported to constitute the upper few feet of soil
column underneath the Fluff. This remedy calls for excavating two feet of soil underneath the
Fluff. The common elements would also be implemented.

The deed restrictions included in the common elements would serve to prohibit future use of the
property which might compromise the integrity of the cap. Site security measures (also a
common element)  would be maintained to prevent inadvertent damage to the cap by trespassers.

Through the combination of the treatment of organic constituents and the use of stabilization and
surface capping to address residual constituents not treated through the SVE/bioventing process
(i.e., metals) this alternative would be effective  by eliminating the direct contact pathway, as
well as reducing the potential for migration of COIs from soils to groundwater. With proper
routine maintenance,  the cap would remain reliable  and effective in the long-term.

Excavation/grading activities for both the SVE/bioventing and the ex-situ stabilization element
of the alternative would increase the short-term potential for exposure, as well as the potential

-------
for migration of COIs from these areas. The potential short-term exposure of COIs can be
mitigated during excavation/grading activities through the implementation of conventional
health and safety techniques, as well as dust and erosion/runoff controls. The temporary
structures employed during the stabilization process would also serve to reduce the short-term
potential for exposure to dust and VOCs.

B.5  Alternative 5 - Low Temperature Thermal Desorption,  Surface Capping

Estimated Capital Cost:                     $10,499,000
Estimated Annual O&M Cost:                  $    12,000
Estimated Present-Worth Cost*:              $11,712,262

*Cost includes common elements

The LTTD alternative consists of the excavation of Fluff, lagoon sediment, and surface soil
treatment of these materials using LTTD, backfilling of the treated materials into the excavated
area, regrading and compacting the backfilled area,  and constructing a RCRA Subtitle C cap
over the backfilled area to prevent surface water infiltration. The common elements would also
be implemented.

Targeted materials would be excavated and stockpiled in a temporary structure that would
prevent precipitation or inclement weather conditions from increasing the material moisture
content or otherwise affecting remedial activities.  Excavation of targeted material would be
performed at a rate necessary to provide a stockpile of materials sufficient to support tree to five
days of treatment (approximately 750 to 1250 cubic yards). Any precipitation collected in the
excavation treatment would be routed to the lagoon water treatment system and ultimately
discharged to surface water  (discussed as a common element).

Materials to be treated would be moved from the temporary structure and loaded into the LTTD
treatment unit. The unit would be a continuous system in which contaminants would be
removed from the soil through volatilization. Volatilization would be accomplished through
agitation of the soil in the presence of heat and vacuum pressure.

Following the LTTD treatment cycle, the materials would be removed from the treatment unit
via a conveyor belt system and placed in a temporary stockpile for cooling and confirmatory sampling.

Upon verification that treatment objectives have been achieved, the treated materials would be
used as backfill for the excavations. Following the completion of the treatment activities, the
excavated/backfilled area would be graded and compacted to form a stable surface with suitable
slopes, and a RCRA Subtitle C cap would be installed over the backfilled area to prevent
infiltration of surface water and to prevent subsequent leaching of metal and non volatile organic
contamination . The cap would cover an area of approximately 8 acres. The surface of the cap
would be vegetated and maintained for a period of 30 years.

The deed restrictions included in the common elements would serve to prohibit future use of the
property which might compromise the integrity of the cap. Site security measures  (also a
common element) would be maintained to prevent inadvertent damage to the cap by trespassers.

Through the combination of the treatment of organic constituents and the use of surface capping
to address residual constituents not treated through the LTTD process (i.e., metals), this
alternative would be effective by eliminating the direct contact pathway, as well as mitigating
the potential for migration of COIs from soils to groundwater. With proper routine maintenance,
the cap would remain reliable and effective in the long-term.

Excavation/grading activities for both the LTTD element of the alternative as well as the surface
capping element of the alternative would increase the short-term potential for exposure, as well
as the potential for migration of COIs from these areas.  These potential short-term exposures
can be mitigated during excavation/grading activities through the implementation of
conventional health and safety techniques, as well as dust and erosion/runoff controls. The
temporary structures employed during the LTTD stockpiling activities would also serve to
reduce the short-term potential for exposure from dust and VOCs.

B.6.  Alternative 6 - On-site Incineration, Stabilization and Off-site Disposal of Ash,

-------
       Surface Capping

This alternative is the remedy selected in the June 29, 1990 Record of Decision  (ROD) for OU-2.

Estimated Capital Cost:                    $35,556,000
Estimated Annual O&M Cost (Years 1-2):      $175,000
Estimated Present-Worth Cost*:             $36,889,405

*Cost includes common elements

Based on the Final Feasibility Study  (November, 1989), capital costs for on-site incineration is
$34,329,000. However, based on the new volume calculation, the estimated capital cost of
Alternative 6 is $35,556,000.

This remedy which is defined in the June 29,  1990 ROD for OU-2, consists of the following elements:

   •      On-site incineration of the Fluff,  stabilization of ash and disposal of stabilized ash in an
          off-site RCRA landfill;

   •      On-site incineration of the contaminated soils  for organics removal, stabilization of  the
          metals where necessary, and disposal in an off-site RCRA landfill;

   •      On-site treatment  of the lagoon water for organics treatment and metals removal and
          discharge in accordance with Federal NPDES and Pennsylvania reguirements (discussed
          as a common element);

   •      Covering of the soils under the Fluff piles,  after the Fluff has been removed,  in
          accordance with RCRA Subtitle C closure reguirements.

The common elements would also be implemented.

A transportable rotary kiln incineration system would be used to implement this alternative.
Fluff would be graded to form a level surface, excavated, and stockpiled in a temporary
structure. Excavation would be performed at a rate necessary to provide a stockpile of materials
sufficient to support three to five days of treatment. Stormwater collected in the excavation
would be routed to the lagoon water treatment system and discharged to Mauses Creek  (common element).

Following incineration, combined bottom and fly ash would be stabilized on-site as needed using
a cement-based or other suitable stabilizing agent and placed in a temporary  stockpile for
hardening and confirmatory sampling. Upon verification that the treatment goals/disposal
reguirements have been achieved, the stabilized ash would be loaded onto trucks for transport to
a permitted off-site hazardous waste disposal facility.

Quench water and other fluids generated during the incineration/stabilization processes would be
collected and treated on-site using a physical/chemical process, and discharges to Mauses Creek.

The excavated area would be backfilled and graded to promoted drainage, and covered with a
RCRA Subtitle C cap to prevent infiltration of surface water.

The deed restrictions included in the common elements would serve to prohibit future use of the
property which might compromise the integrity of the cap. Site security measures  (also a
common element)  would be maintained to prevent inadvertent damage to the cap by trespassers.

Through the combination of the treatment of organic constituents, the use of  stabilization and
off-site disposal to address residual constituents not treated through the incineration process, and
the use of surface capping to address any residual constituent concentrations remaining in the
excavated area followed by backfilling, this alternative would be effective in meeting the
remedial action objectives by eliminating the direct contact pathway, as well as reducing the
potential for migration of COIs from soils to groundwater. With proper routine maintenance, the
cap would remain reliable and effective in the long-term.

Excavation, material handling, and off-site transportation activities would increase the short-term
potential for exposure, as well as the potential for migration of COIs from these areas. These

-------
potential short-term exposures can be mitigated during these activities through the
implementation of conventional health and safety technigues, as well as dust and erosion/runoff
controls. The temporary structure employed during the stockpiling activities would also serve to
reduce the short-term potential for exposure. Emissions control on the incineration unit would
serve to reduce the short-term potential for exposure to constituents released during the
incineration process, but there may be an increased risk, based on pilot-scale tests, to on- and
off-site receptors to dioxin and furan emissions.

B.7  Alternative 7 - Off-site Incineration, Surface Capping

Estimated Capital Cost:                         $49,928,000
Estimated Annual O&M Cost:                        $12,000
Estimated Present-Worth Cost*:                  $51,124,702
    *Cost includes common elements

This alternative involves the incineration of the Fluff, lagoon sediment, surface and subsurface
soil in an off-site rotary kiln incinerator. This alternative includes the excavation and off-site
transport of Fluff/sediment/soils to a permitted incineration facility for treatment and subseguent
disposal of the resultant ash, the backfilling of the excavated area, and the construction of a
RCRA Subtitle C cap over the backfilled area to prevent infiltration of surface water. The cap
would cover approximately 8 acres. The common elements would also be implemented.

The deed restrictions included in the common elements would serve to prohibit future use of the
property which might compromise the integrity of the cap. Site security measures (also a
common element) would be maintained to prevent inadvertent damage to the cap by trespassers.

Through the combination of the off-site transport and treatment/disposal actions, and the use of
surface capping to address any residual constituent concentrations remaining in the excavated
area following backfilling, this alternative would be effective by eliminating the direct contact
pathway, as well as reducing the potential for migration of COIs from soils to the groundwater.
With proper routine maintenance, the cap would remain reliable and effective in the long term.

Excavation, material handling, and off-site transportation activities would increase the short-term
potential for exposure, as well as the potential for migration of COIs from these areas. These can
be mitigated during construction activities through the implementation of conventional health
and safety technigues, as well as dust and erosion/runoff controls.

VIII. COMPARATIVE EVALUATION OF ALTERNATIVES

Each of the remedial alternatives summarized in this plan has been evaluated with respect to the
nine (9) evaluation criteria set forth in the NCP, 40 C.F.R. Section 300.430(e) (9). These nine
criteria can be categorized into three groups:  threshold criteria, primary balancing criteria, and
modifying criteria. A description of the evaluation criteria is presented below:

Threshold Criteria:

 1. Overall Protection of Human Health and the Environment addresses whether a remedy
     provides adeguate protection and describes how risks are eliminated, reduced,  or
     controlled.

 2. Compliance with Applicable or Relevant and Appropriate Reguirements  (ARARs)
     addresses whether a remedy will meet all of the applicable, or relevant and appropriate
     reguirements of environmental statutes.

Primary Balancing Criteria:

 3. Long-term Effectiveness refers to the ability of a remedy to maintain reliable protection
    of human health and the environment over time once cleanup goals are achieved.

 4. Reduction of Toxicity, Mobility, or Volume through Treatment addresses the degree to
     which alternatives employ recycling or treatment that reduces toxicity, mobility, or
     volume of contaminants.

-------
 5. Short-term Effectiveness addresses the period of time needed to achieve protection and
     any adverse impacts on human health and environment that may be posed during the
     construction and implementation period until cleanup goals are achieved.

 6. Implementability addresses the technical and administrative feasibility of a remedy,
     including the availability of materials and services needed to implement a particular
     option.

 7. Cost includes estimated capital, operation and maintenance costs, and present worth costs.

Modifying Criteria:

 8. State Acceptance indicates whether, based on its review of backup documents and the
     Proposed Plan, the State concurs with, opposes, or has no comment on the preferred alternative.

 9. Community Acceptance includes assessments of issues and concerns the public may have
     regarding each alternative based on a review of public comments received on the
     Administrative Record and the Proposed Plan.

The comparison of the remedial alternatives based on these criteria is presented below.

1.  Overall Protection of Human Health and the Environment

The implementation of the No Action Alternative would not provide protection of human health
and the environment. Exposure to contaminants in the Fluff waste and Site soils would pose a
health threat to individuals who come in contact with these materials, particularly if exposure
occurs regularly. Because this alternative does no meet this threshold criterion, it will not be
further evaluated under the remaining criteria.

Alternatives 1-7 provide overall protection of human health and the environment by either
removing contaminants in the Fluff, soil, and sediment and/or isolating them to prevent direct
contact and the potential for further migration. Alternative 1 (Multilayer Cap) prevents direct
contact with contaminants in the Fluff waste, soils, and sediments and reduces the potential for
contaminant migration by consolidating the material and covering it with an impermeable cap.

Alternative 2 (Stabilization with Soil Cover) immobilizes contaminants by mixing the Fluff, soil,
and sediment with cement-like material prior to covering with soil. Stabilization of the Fluff
material and soil reduces both the potential for individuals to come in direct contact with the
contaminants and the potential for contaminants to migrate to the groundwater. The soil cover
provides additional protection against direct contact with the stabilized contaminants. The
treatment of the NAPLs provides additional protection against migration of contaminants in the
soil to groundwater. Protection from the release of VOCs into the environment during the
stabilization process is achieved through the utilization of a temporary enclosed structure
capable of capturing and treating VOC emissions. Such emissions would be treated through a
vapor phase carbon adsorption unit.

Alternatives 3,  4, and 5 each use a combination of treatment and an impermeable cap to prevent
direct contact with contaminants in the Fluff, soil and sediment and to reduce the potential for
contaminant migration to groundwater. Alternatives 3 and 5 remove organic contaminants in the
Fluff and soil through SVE/bioventing prior and LTTD, respectively, prior to capping.

Alternative 4 includes the components of Alternative 3 and adds stabilization to further
immobilize the inorganic contaminants prior to capping.

Alternatives 6 and 7 also use a combination of treatment and an impermeable cap to prevent
direct contact with contaminants and to reduce the potential for contaminant migration to
groundwater. These alternatives destroy the organic contaminants through on- or off-site
incineration. Residual contamination in the ash is stabilized (if necessary) and disposed off-site.
Therefore, the amount of contamination remaining on-site and capped is reduced.

2.   Compliance with ARARs

Any cleanup alternative considered by EPA must comply with all applicable or relevant and

-------
appropriate federal and state environmental requirements. Applicable requirements are those
substantive environmental standards, requirements, criteria, or limitations promulqated under
federal or state law that are legally applicable to the remedial action to be implemented at the
Site. Relevant and appropriate requirements, while not being directly applicable, address
problems or situations sufficiently similar to those encountered at the Site that their use is well-
suited to the particular site. All the alternatives comply with the following ARARs, as appropriate:

Chemical-Specific ARARs

The Pennsylvania Land Recycling Program Regulations at 25 Pa. Code 250.305 identify soil
remedial standards which are applicable to the implementation of the remedy.

Action-Specific ARARs

Multilayer Cap: The following provisions of the Pennsylvania Residual Waste Management
Regulations, 25 Pa. Code Chapter 288, Subchapter C, regarding the closure of landfills are
relevant and appropriate to the covering or capping of the landfilled industrial waste materials in
Alternatives 2, 3, and 4: (1) access to the Site shall be controlled as set forth in 25 Pa. Code
°288.212 (a);  (2)  the cover shall be constructed in conformance with the requirements of 25 Pa.
Code °288.234; (3) revegetation of the cover shall be established in accordance with the
requirements of 25 Pa. Code °288.236, and shall meet the standard for successful revegetation as
set forth in 25 Pa. Code °288.237;  and (4) soil erosion and sediment control shall be conducted
in accordance with the requirements of 25 Pa. Code °288.242. The following provisions of the
Pennsylvania Hazardous Waste Regulations,  25 Pa. Code Chapter 264, regarding the
maintenance of landfill caps are relevant and appropriate to the maintenance of the capped area
of the Site in Alternatives 1, 3, 4, 5, 6 and 7:   (1) closure performance standards shall be achieved
as set forth in 25 Pa. Code ° 264.111; (2)  post closure care and use of the Site shall be carried
out in accordance with the requirements of 25 Pa. Code ° 264.117;  (3) the final cover shall meet
the requirements of 25 Pa. Code ° 264.3 10(1 );   (4)  vegetation of the cover shall meet the
requirements of 25 Pa. Code ° 264.310(4);   and  (5) the closure shall meet the performance
objectives of 25 Pa. Code ° 264.310(5).

Excavation:  The provisions of Pennsylvania's Erosion and Sedimentation Control and
Restoration Regulations set forth in 25 Pa.  Code °° 102.4-24 are applicable to earth-moving
activities associated with the multilayer cap to be installed in Alternatives 2, 3 and 4. In
addition, Pennsylvania regulations regarding the Prohibition of Certain Fugitive Emissions and
Particulate Matter set forth at 25 Pa. Code °° 123.1 and 123.2 are applicable to the dust
suppression controls required to be used in conjunction with these earth-moving activities.

Discharge of Treated Lagoon Water:  A common element under all the alternatives is treating the
water in the lagoons, if necessary, in a physical/chemical treatment process and discharging the
treated water to an unnamed tributary of Mauses Creek or to an industrial process. The
following substanitive requirements of the National Pollutant Discharge Elimination System are
applicable to these discharges:  40 C.F.R.  °° 122.2,  122.4, 122.5, 122.21, 122.26, 122.29, 122.41,
122.43-45,  122.47, 122.48, and 25 Pa. Code °° 92.1, 92.3, 92.31, 92.41, 92.51, 92.55, 92.57, and
92.73. The following requirements of the Pennsylvania Drinking Water standards are relevant
and appropriate to all discharges to an industrial process:  25 Pa. Code °° 109.201-203. The
following water quality standards are applicable to all discharges (regardless of where
discharged):  40 C.F.R. ° 131.32 and 25 Pa. Code °° 93.1-9z. The following requirements for
controlling the discharge of toxic substances are applicable to all discharges  (regardless of where
discharged):  25 Pa. Code °° 16.1, 16.24,  16.31-51, 16.101-102.

Hazardous Waste Generation:   The alternatives involving on-site treatment  (Alternatives 2
through 6)  may result in the generation of wastes that would be regulated under current
hazardous waste regulations. Any hazardous waste generated shall be analyzed and
characterized according to the requirements of 25 Pa. Code ° 262.11 and identified pursuant to
the requirements of 25 Pa. Code ° 262.12.  Authorization for shipment of hazardous waste shall
be obtained pursuant to 25 Pa. Code ° 262.13. All shipments of hazardous waste for treatment at
a separate location on the Site shall be manifested according to the requirements of 25 Pa. Code
00 262.20,  262.22, 262.23, and shall meet all of the packing, placarding and labeling
requirements of 25 Pa. Code °° 262.30, 262.33. If hazardous waste is accumulated on the Site,
it shall be done so in accordance with all of the requirements of 25 Pa. Code ° 262.34.
Transportation of hazardous waste for treatment on the Site shall comply with all the

-------
requirements of 25 Pa. Code Part 263. Hazardous wastes shall be stored in accordance with the
requirements of 25 Pa. Code Part 264 subparts I and J.

3.   Lonq-Term Effectiveness and Permanence

Alternative 1 (Multilayer Cap)  will provide an effective remedy in the lonq term provided that
the cap is properly maintained. Permanence of the remedy is also dependent on proper
maintenance. Althouqh 30 years of maintenance has been included for cost-estimatinq purposes,
maintenance will be required for an indefinite period and components of the cap could
eventually require replacement.

Alternative 2 (Stabilization with Soil Cover) provides a qreater level of lonq-term effectiveness
and permanence than Alternative 1 because it relies less on maintenance. Stabilization of the
Fluff material and soil will immobilize the contaminants and reduce the potential for leachinq
into the qroundwater. Additionally, the two-foot soil cover will prevent direct contact with the
stabilized mass. The soil cover over the stabilized mass is expected to provide equivalent
performance to a RCRA Subtitle C Cap. Maintenance of the soil cover and institutional controls
to prevent its disturbance would be required to ensure permanence.

Alternative 3 (SVE/Bioventinq and Cap) and Alternative 5 (LTTD and Cap) will both provide
qreater lonq-term effectiveness and permanence than the multilayer cap alone (Alternative 1),
but may be less effective than Alternative 2 since neither SVE/Bioventinq or LTTD will
immobilize the inorqanic contaminants. Therefore, Alternatives 3 and 5, like Alternative 1,
requires qreater reliance on proper maintenance of the cap to achieve lonq-term effectiveness
and permanence.

Alternatives 4,  6, and 7 provide the qreatest deqree of lonq-term effectiveness and permanence.
Alternative 4 reduces the level of orqanic contamination to be capped throuqh SVE/bioventinq
and immobilizes the inorqanic contaminants throuqh stabilization, thus reducinq reliance of
proper cap maintenance. Alternatives 6 and 7 reduce the level of both orqanic and inorqanic
contaminants to be capped. Orqanic contaminants are destroyed in the incineration process and
inorqanic contaminants which remain in the ash are stabilized, if necessary, and disposed off-
site. Use of a multilayer cap in Alternatives 4, 6, and 7 may also provide somewhat qreater lonq-
term effectiveness and permanence that use of a soil cover (Alternative 2).

4.   Reduction of the Toxicity, Mobility or Volume of Contaminants Throuqh Treatment

Alternative 1 does not provide any reduction in the toxicity, mobility or volume of Site
contaminants throuqh treatment. The use of a multilayer cap does, however, reduce the mobility
of contaminants by preventinq rain from movinq throuqh the contaminated material and
transportinq contaminants to the qroundwater.

The use of stabilization in Alternatives 2 and 4 primarily reduces the mobility of Site
contaminants. This treatment process may, however, increase the volume of material due to the
addition of the curinq aqents.  While the mobility of orqanic contaminants may increase durinq
the treatment process, particularly VOCs, the treatment area would be covered to capture
volatilized contaminants. In addition, the process of stabilization facilities volatilization of
volatile orqanics due to heat qeneration and mixinq. Thus alternatives 2 and 4 reduce the
volume of orqanics in the stabilized waste. The SVE/bioventinq treatment in Alternatives 3 and
4 reduce the toxicity and volume of Site orqanic contaminants by encouraqinq bioloqical
deqradation and extraction of volatile orqanics.

Alternative 5 (and Alternative 2 in the NAPL areas) reduces the toxicity, mobility and volume of
primarily volatile orqanic contaminants by volatilizinq and capturinq the contaminants throuqh
the LTTD process. Inorqanic contaminants would remain in the treated material and would be
capped on-site.  Alternatives 6 and 7 reduce the toxicity, mobility and volume of orqanic
contaminants by destroyinq them throuqh incineration. However, incineration has the potential
create and release contaminants throuqh air emissions which are more toxic than those enterinq
the process. Controls measures must be properly implemented to ensure unacceptable releases
do not occur. Inorqanic contaminants that cannot be destroyed will remain in the ash and may be
immobilized throuqh stabilization if required prior to landfillinq at an off-site facility.

5.   Short-Term Effectiveness

-------
Alternative 1  (Multilayer Cap) provides short-term effectiveness because it requires minimal
disturbance of the contaminated material and can be implemented relatively quickly. Relatively
few controls are needed durinq construction to ensure safety.

Alternatives 2, 4, and 5 also provide short-term effectiveness, but require use of air emission
controls (e.g., temporary enclosed structures over excavation) and monitorinq devices durinq
excavation to ensure the safety of on-site workers and others in close proximity of the Site.
These measures can be readily implemented thouqh the required Site health and safety proqram.

Alternative 3 does not require excavation, but similar air emission controls and monitorinq
devises are required to ensure that contaminants volatilized throuqh the SVE/bioventinq process
are not released from the Site. Alternatives 4 and 5 also require such measures to volatilized
emissions.

Alternative 6 can provide short-term effectiveness, but this effectiveness is hiqhly dependent on
proper control measures. Alternative 6 has the potential to release toxic air emissions (ie.,
furans and dioxins) from the on-site incinerator based on the results of pilot-scale tests. The
chlorine content of Fluff waste is very hiqh because of the polyvinyl chloride insulation used.
Alonq with the presence of polyvinyl chloride, the presence of copper as a catalyst makes an
ideal condition for the formation of dioxins durinq the incineration. Short-term effectiveness of
this alternative depends on proper implementation of air emission control devices for the
incinerator stacks to monitor and control these emissions. Flue qas particulate collected as
baqhouse ash is cadmium and lead-contaminated and would require manaqement as a
hazardous waste. Proper handlinq of the kiln ash discharqe and baqhouse ash is required to
ensure that these materials do not pose a health threat to on-site workers. Alternative 6 also
involves off-site transportation of the incinerator ash, thus requirinq additional measures to
ensure safety.

The short-term effectiveness of Alternative 7 depends on the use of proper controls durinq
excavation as described for Alternatives 2, 4, and 5 and on proper precautions durinq
transportation of the excavated material off-site. These controls can be readily implemented
throuqh the required Site health and safety proqram.

6.   Implementabilily

The technoloqy and materials required to construct the multilayer cap in Alternative 1 (also a
component of Alternatives 3 throuqh 7)  are readily available, so this alternative can be easily
implemented. The soil cover in Alternative 2 can also be readily constructed.

The stabilization process in Alternatives 2 and 4 would not be difficult to implement since 10%
Type I Portland Cement is readily available. The SVE/bioventinq processes in Alternatives 3
and 4 have been demonstrated to work effectively at other sites and are commercially available
technoloqies. However, performance of SVE/bioventinq is dependent on Site-specific
characteristics of the material beinq treated (e.g., temperature, moisture, pH, nutrient content)
and the success and duration of treatment is difficult to predict. SVE/bioventinq is expected to
require a lonqer time frame to implement than stabilization.

The LTTD treatment process of Alternatives 2 and 5 has been demonstrated to be effective for
volatile orqanics at other sites and is a commercially available technoloqy. Successful
implementation of LTTD is less dependent on Site-specific factors than SVE/bioventinq and can
be readily implemented. LTTD requires controls to ensure that contaminants volatilized durinq
the process are not released to the air at unacceptable levels.

On-site incineration in Alternative 6 is a demonstrated and commercially available treatment
technoloqy. However, optimization of the system for the Site-specific characteristics of the
material to be incinerated may be difficult. Incineration must comply with strinqent RCRA
incinerator operatinq requlations and standards. The close proximity of residences and a school
may make implementation difficult, and the public has historically opposed on-site incineration.

Alternative 7 requires no on-site treatment and can be readily implemented. Off-site incineration
facilities are commercially available to handle the materials from the Site. The equipment and
materials needed to safely excavate and transport the contaminated Fluff, soil, and sediment are

-------
readily available.


7.   Cost

Table 3 presents a comparative cost summary of the alternatives discussed in this Proposed Plan.

                                  Table 3
                     Remedial Alternatives Cost Summary

                                      Annual O&M Cost
Alternative
1
2
3
4
5
6
7
Capital
$1,
$6,
$8,
$12,
$10,
$35,
$49,
596,
924,
697,
030,
499,
556,
928,
Cost
354
062
147
443
000
000
000
1-2 Years
$12,
$346,
$175,
$175,
$12,
$175,
$12,
000
203
000
000
000
000
000
3-30 Years
$12,
$12,
$12,
$12,
$12,

$12,
000
000
000
000
000
$0
000
Present Worth
$2,
$8,
$10,
$13,
$11,
$36,
$51
793,080
752,530
210,034
543,330
712,262
889,405
,124302
8.   State Acceptance

The Commonwealth of Pennsylvania has concurred with the selected remedy, Alternative 2.

9.   Community Acceptance

In general, the community has accepted the selected Fluff, soil, the lagoon water and the on-site
tanks & drums remedy for the OU-5. The Responsive Summary, attached, provides a through
review of guestions and comments received during the Public Comment Period including EPA's
responses.

IX.  SELECTED REMEDY

A.   General Description of Selected Remedy

The selected remedy for OU-5 - surface soil,  lagoon water and sediment, Fluff (chopped and
shredded wire insulation material mixed with bits of plastic and copper),  and waste materials
contained in tanks and drums, is Alternative 2 - Ex-Situ Stabilization/Low Temperature Thermal
Desorption. This alternative involves the following components:

   •       Site preparation which includes temporary sedimentation and erosion control and the
          clearing of vegetation around the Fluff and lagoon;

   •       Treatment/containment of contaminants of interest in Fluff,  lagoon sediment, and surface
          soils through ex-situ stabilization and backfilling excavated areas with the stabilized
          material;.

   •       Treatment of soil containing Non-Agueous Phase Liguids utilizing Low Temperature
          Thermal Desorption desorption to reduce tetrachloroethene (PCE)  levels below the level
          that constitutes a principle threat;

   •       Covering the areas on the Site within the fenced area shown in Figure  2  with two-foot of
          EPA and PADEP approved soil layer and vegetation contour to prevent ponding and to
          control erosion;

   •       Site restoration by removing all the debris;

   •       Off-site transport of materials in  tanks and drums at the Site to an appropriate facility;

   •       Excavation and off-site disposal to an appropriate facility of drums,  tanks and
          contaminated soil due to any leaking drums and/or tanks.

-------
   •       Draining of lagoon water,  treatment of the water in a physical/chemical treatment process
          (if needed),  and discharge of the treated water to an unnamed tributary of Mauses Creek,
          adjacent to the Site and/or to an industrial process;

   •       Implementation/enforcement of institutional controls at the Site,  including but not limited
          to, deed restrictions;

   •       Long-term operation and maintenance (O&M)  activities including Site security through
          the maintenance of existing Site fence.

Site preparation shall include the leveling of the Fluff piles and spreading the stabilized Fluff to a
uniform depth. All Fluff, minimum of two feet of lagoon sediments, and minimum of two feet
of soils underneath the Fluff piles shall be excavated and stockpiled for subseguent stabilization.
The extent of the sediments and the soils excavation beyond the minimum shall be determined
by field observations for the presence of visible Fluff. The excavation activities shall occur
inside a temporary, moveable structure intended to prevent the introduction of precipitation into
the excavation and to control dust and volatile organic compound  (VOC) emissions. All material
shall be stockpiled and treated in a staged treatment area. The structures shall be operated under
slight negative pressure, and the exhaust air flow shall be routed through a vapor-phase carbon
adsorption unit to treat VOC emissions.

Excavation shall be performed at a rate necessary to provide a stockpile of materials sufficient to
support three to five days of treatment  (750 to 1,250 cubic yards). Stabilization shall be
performed by mixing the materials with 10% or greater Type I Portland Cement. Following
mixing, the resulting slurry shall be placed into the excavation and allowed to cure. Excavation
activities shall continue on the remaining trenches within the excavation structure. Once all
materials are treated within the excavation structure, the structure shall be moved to the next area
of excavation.

The excavated areas shall be backfilled with the stabilized material in a manner intended to
promote drainage following curing of the stabilized materials. The fenced area shown in Figure
2 shall be covered with a two-foot topsoil layer and vegetated to prevent ponding of liguids and
minimize erosion.

The presence of Non-Agueous Phase Liguids in overburden soils shall be treated through the use
of Low Temperature Thermal Desorption. The extent of this area and the total volume of soil
treated with Low Temperature Thermal Desorption may be subject to change based on the
results of the investigation for the presence of Non-Agueous Phase Liguids in soil to be
conducted during the implementation of the remedial action.

Low Temperature Thermal Desorption can effectively remove Non-Agueous Phase Liguids from
the soil by heating the soil under vacuum conditions to induce volatization. The optimal
temperature and pressure shall be determined during a pre-design treatability study. The soils
treated by Low Temperature Thermal Desorption shall be backfilled into the excavations (with
prior stabilization if the treated soil demonstrates the characteristic of a hazardous waste based
upon the results of a Toxicity Characteristic Leaching Procedure test. 40 C.F.R. °261.24.).

The resulting fixed/stabilized solid matrix minimizes the potential migration of contaminants of
interest to groundwater; the stabilization process and subseguent soil cover also prevent direct
contact. The potential for exposure to volatile and dust emissions is mitigated through the use of
the temporary structures covering the excavation and stockpile/process areas and treatment of
VOCs through vapor-phase carbon adsorption.

The South West area  (as shown in the Figure 2) of the Site shall be investigated for any buried
drums and if the drums are found excavation of the subsurface soil shall be performed. If the
drums or tanks are discovered, they shall be excavated and removed. If characterization testing
of the drum contents indicates the presence of listed waste  (40 C.F.R. Part 261, Subpart D) or if
the contents exhibit a characteristic of hazardous waste  (40 C.F.R. 261, Subpart C), they shall be
managed in accordance with the federal land disposal restrictions  (40 C.F.R. Part 268). The
drum debris shall be managed in similar manner. Subsurface soil in the area surrounding the
drums shall be tested for the presence of Non-Agueous Phase Liguids. If Non-Agueous Phase
Liguids are discovered, the Non-Agueous Phase Liguid containing soils shall be treated, with
Low Temperature Thermal Desorption as discussed more fully in subsection B. 10 below.

-------
B.   Performance Standards/Cleanup Criteria

To reduce the risk to human health and the environment, impacted surface and subsurface soils,
lagoon water and sediment, Fluff, and waste materials contained in tanks and drums, shall be
remediated as described in Section IX, Description of Selected Remedy. Remediation shall be
performed for materials which exceed the Remedial Action Levels presented in the table 2, in
accordance with the ARARs; and other criteria listed in Section X,  Statutory Determinations. All
components of the selected remedy, Alternative 2, shall be implemented in accordance with the
performance standards detailed herein and ARARs; listed in Section X, Statutory Determinations.

1.   Erosion Control

Erosion and sediment control measures shall be installed in accordance with the substantive
requirements of the Commonwealth Pennsylvania Clean Stream Law and in accordance with any
related local regulations. Prior to commencement of excavation or soil disturbance work, an
erosion and sedimentation control plan shall be developed and implemented to address control
measures for all activities that potentially transport soil or sediment. The plan shall be developed
and submitted to EPA for acceptance and to PADEP and the local goveriunent for approval.

2.   Pilot Testing of Stabilization Process

During the remedial design phase, field pilot testings of the stabilization process shall be
performed to obtain optimal stabilization process parameters as set forth in
"Solidification/Stabilization and its Application to Waste Material  (EPA/530/R-93/012 June 1993)."

3.   Stabilization of Fluff and Two Feet of Soil underneath the Fluff.

The Fluff and soil shall be screened and separated before stabilization to achieve the parameters
developed during the field pilot testings. The proper ratio of Fluff and soil shall be mixed with
appropriate amount of binding material to achieve the standards developed during the field pilot
testings. The stabilized waste shall be checked in accordance with "Stabilization/Solidification
of CERCLA and RCRA Wastes, Physical Tests, Chemical Testing Procedures, Technology
Screening, and Field Activities  (EPA 625/6-89/022 May 1989)." Soil beneath the Fluff piles
shall be excavated to a minimum of two feet. The extent of excavation of soil beyond two feet
underneath Fluff piles shall be determined by visual observation of Fluff presence. The
stabilized mass shall pass the SPLP leachability test.

4.   Backfilling of the Excavated Areas

The excavated areas shall be backfilled with the stabilized material.

5.   Placing of Two Feet of Soil Cover within the Fence Area shown in the Figure 2.

a.   The two feet of soil cover shall be placed over the entire area of the Site within the
      fenced area shown in Figure 2.

b.   The soil cover shall be covered with vegetation to control air and water erosion of the soil
      and to maintain aesthetic value of the area.

C.   The soil cover shall protect Site users from being exposed to the soil contaminants either
      by the direct contact with contaminated waste/soil or by inhalation/ingestion of soil
      and/or Fluff dust.

d.   The final soil cover shall be designed and constructed in accordance with the
      Pennsylvania Residual Waste Management Regulations, 25 Pa. Code Chapter 288,
      Subchapter C, regarding closure of landfills. Relevant provisions include, but are not
      limited to, 288.212 (access control), 288.234 (final cover and grading), 288.236
      (revegetation), 288.237 (standards for successful revegetation), and 288.242 (soil erosion
      and sedimentation control).

6.   Monitoring Program

-------
The groundwater and surface water monitoring reguirements for OU-5 are covered under the
OU-3 groundwater monitoring program. Perimeter air monitoring shall be performed at a
minimum of four locations at each of the four compass points at the perimeter of the Site for the
contaminants identified in table 2. The fugitive emissions control actions levels shall be set
according to Occupational Safety & Health Act (OSHA) permissible exposure levels (PELs) if
available or according to adverse human health effect threshold. Fugitive emissions shall be
controlled in accordance with applicable Pennsylvania Air Resources Rules and Regulations.
The monitoring for VOCs and total dust shall be performed using on-site monitors to obtain real
time readings. A fugitive emissions control plan shall be developed based on the fugitive
emissions control action levels and submitted to EPA for acceptance and to PADEP for their
review and approval if reguired by the law.

7.   Storm Water Control

A storm water control plan shall be developed to minimize runoff and erosion from all areas of
soil/Fluff disturbance associated with Site remediation activities and to prevent migration of
Fluff off Site. The plan shall be submitted to EPA for acceptance. The plan shall be submitted to
PADEP, the local county and the local government for their approval.

8.   Surface Water Discharge

Any surface water discharge to Mauses Creek shall comply with substantive reguirements of the
Commonwealth of Pennsylvania National Pollution Discharge Elimination System regulations,
25 Pa. Code Chapter 92. A plan to comply with those reguirements shall be submitted to EPA
and PADEP for review and approval.

9.   Use of Treated Water

If the treated water is used for an industrial purpose, it shall meet PADEP drinking water
standards set forth at 25 Pa. Code Subchapter 109.13.

10. Investigation of Presence of Non-Agueous Phase Liguids in the soil

Areas identified as the former carbon pile area, buried lagoon area and the area adjacent to the
west side of the plant building (see figure 2) shall be sampled using a geoprobe and checked for
Non-Agueous Phase Liguids presence using soil water shake test as described in the document
EPA/600/R-93/022. A sampling and analysis plan for Non-Agueous Phase Liguid testing shall
be submitted to EPA and PADEP for their approval.

11. Thermal Desorption

The soils with Non-Agueous Phase Liguids shall be treated with the Low Temperature Thermal
Desorption to drive off Non-Agueous Phase Liguids and to achieve PCE cleanup levels of 375
mg/kg. The low temperature thermal desorption system shall have air pollution control measures
as needed to meet Commonwealth of Pennsylvania Control and Abatement of Air Pollution
reguirements and specifically shall meet federal and Commonwealth of Pennsylvania air
emissions standards. Any residual carbon waste generated during the treatment shall be disposed
off-site at an approved RCRA Subtitle C facility. If the thermal treatment is not successful in
achieving the cleanup levels for PCE, soils with Non-Agueous Phase Liguids shall be sent off-
site for the treatment and disposal at RCRA Subtitle C approved facility.

12. Investigation of Possible Buried Drums

The South West area (as shown in the figure 2) of the Site shall be investigated for any buried
drums or tanks by using geophysical screening technigue. If evidence of drums or tanks is
indicated, excavation of the subsurface soil shall be performed. If the drums or tanks are
discovered, they shall be excavated and removed. If characterization testing of the drum
contents indicates the precence of a listed waste (40 C.F.R. Part 261, Subpart D) or if the
contents exhibit a characteristic of a hazardous waste  (40 C.F.R. 261, Subpart C),  they shall be
managed in accordance with the federal land disposal restrictions (40 C.F.R. Part 268). The
drum debris shall be managed in similar manner.  Subsurface soil in the area surrounding the
drums shall be tested for the presence of Non-Agueous Phase Liguids. If Non-Agueous Phase
Liguids are discovered, the Non-Agueous Phase Liguid containing soils shall be treated with

-------
Low Temperature Thermal Desorption as discussed more fully in subsection B.10 above.

13.  Removal of Above Ground Drums and Above Ground Tanks

If the contents of the above ground drums and above ground tanks are listed wastes  (40 C.F.R.
Part 261, Subpart D),  they shall be managed in accordance with the federal land disposal
restrictions  (40 C.F.R. Part 268). The drum debris shall be managed in a similar manner.

14.   Removal Plans for the Drums and Tanks

A removal plan shall be submitted to EPA and PADEP for their review and acceptance detailing
the assessment and removal of all drums and tanks.

15.   Removal of Non Hazardous Contents and Debris

The Site shall be cleared of all debris and non hazardous waste in accordance with Pennsylvania
Municipal Waste Landfill Regulations, specifically those regulations applicable for construction
debris landfills, Pennsylvania Code Title 25, Chapter 277, and those relating to residual waste
management, Pennsylvania Code Title 25, Chapter 287.

16.   Institutional Control

Institution controls,  including but not limited to deed restrictions, shall be implemented to
restrict land and groundwater use at the Site and reduce the potential for human exposure to
contamination by prohibiting residential development and any use that would decrease the
performance of the soil cover, and/or involve the use of groundwater at the Site.

17.  Operation and Maintenance

The stabilized waste and the soil cover shall be maintained in accordance with the reguirements
set forth in 25 Pa. Code Section 264.111, 264.117, and 264.310(1), (4) and (5).

18.   Quality Control Monitoring

Quality control monitoring shall be performed to evaluate the stabilized waste and the cover. The
freguency and the nature of guality control monitoring shall be determined during the Remedial
Design and shall be approved by EPA in consultation with PADEP prior to implementation.

X.   STATUTORY DETERMINATIONS

EPA's primary responsibility at Superfund sites is to undertake remedial actions that are
protective of human health and the environment. In addition, 121  (b)  of CERCLA, 42 U.S.C
9621, established several other statutory reguirements and preferences. These reguirements
specify that upon completion, the selected remedial action for each site must comply with
applicable or relevant and appropriate ("ARARs") environmental standards established under
federal and state environmental laws unless a statutory waiver is invoked. The selected remedy
must also be cost effective and must utilize treatment technologies to the maximum extent
practicable. Finally,  the statute includes a preference for remedies that permanently and
significantly reduces the volume, toxicity, or mobility of hazardous substances. The following
sections discuss how the selected remedy for this Site meets these statutory reguirements.

A.   Protection of Human Health and the Environment

The selected remedy for Fluff, soil, lagoon water and sediments is protective of human health
and the environment and eliminates the potential for a direct contact with contaminants by
placing of a vegetated soil cover over the stabilized waste. The remediation will also minimize
soil, Fluff and sediment as a continuing sources of impacts to groundwater, and surface water,
and subsurface soils.  In addition, the contaminated groundwater under the Site shall be extracted
and contained under the OU-3.

Air monitoring shall be performed during the excavation phase to monitor air emissions and to
provide information for control measures and worker's exposure. Appropriate safety eguipment
shall be worn by Site workers to protect against exposure during the remediation effort. With the

-------
addition of long-term monitoring and institutional controls, this remedy is protective of human
health and the environment.

B.   Compliance with Applicable or Relevant and Appropriate Reguirements (ARARs)

The selected remedy includes excavation and ex-situ stabilization of soils, sediment, and Fluff in
exceedance of specified action levels for the Site. The remedy will comply with ARARs and To
Be Considered (TBC) Material detailed in this section.

Chemical-specific ARARs and TBCs:

Pennsylvania Water Quality Standards, Pennsylvania Code Title 25, Sections 93.1-9z which
identify surface water guality standards and protected uses of surface water. This Act is
applicable to the discharges of lagoon water to Mauses Creek.

Administration of the Land Recycling Program, 25 Pa. Code, Section 250.305 which identifies
soil cleanup levels. This Act is applicable to determine the soil remediation standards.

Location-specific ARARs and TBCs

The Fish and Wildlife Coordination Act, 16 USC 661, which provides for consideration of the
impacts on wetlands and protected habitats. The Act is applicable to the treatment of the lagoon
water and sediment.

The Fish and Wildlife Improvement Act of 1978 and the Fish and Wildlife Conservation Act of
1980, 16 USC 742a and 16 USC 2901, which provide for consideration of the impacts on
wetlands and protected habitats. The Acts are applicable to the treatment of the lagoon water
and sediment.

Pennsylvania Dam Safety and Encroachment Act, Act of 1978, 25 Pa. Code, Sections 105 et seg.
This Act, and the regulations promulgated thereto, are applicable to any response actions
conducted in or near wetlands areas.

Action specific ARARs:

Toxic Substances Control Act (TSCA) of 1976, 40 CFR Part 761, which pertains to the
regulation and enforcement for testing of commercial chemical substances entering the
environment. This Act is applicable to PCB testing.

Pennsylvania Hazardous Waste Regulations, Pennsylvania Code Title 25, Sections 262.11-13,
262.20-23, 262.30, 262.33, 262.34,264.111, 264.117, 264.310 (1),264.310(4),  264.310(5), as
well as Part 263 and Subparts 264 I and J which are applicable to the on-site hazardous waste
treatment, storage and disposal alternatives.

Pennsylvania Hazardous Waste Activity Rules, Pennsylvania Code Title 25, Sections 266.20-24,
which pertains to the standards for recycled material used in a manner consistent with disposal.
These rules are applicable to on-site stabilization and disposal of Fluff waste as well as reuse of
treated water for any industrial purpose.

Pennsylvania Municipal Waste Landfill Regulations, Pennsylvania Code Title 25, Sections
277.132-151, 277.217, 277.218,  277.220, 277.234, 277.235 which pertain to the construction of
debris landfills. These rules are relevant and appropriate to on-site stabilization and disposal of
Fluff waste.

Clean Water Act's National Pollution Discharge Elimination System (NPDES) Regulations, 40
CFR Sections 122.2, 122.4, 122.5, 122.21, 122.26, 122.29, 122.41, 122.43-45, 122.47, 122.48,
which regulate discharge of pollutants into navigable waters. These regulations are applicable to
the discharge of lagoon water to Mauses Creek.

Pennsylvania Clean Streams Law, Pennsylvania Code Title 25, Sections 16.1,  16.24, 16.31-5 1,
16.101-102, which provide protection for the protection of streams and water guality control.
This Act and regulations are applicable to the discharge of lagoon water to Mauses Creek.

-------
Pennsylvania NPDES Rules, Pennsylvania Code Title 25, Sections 92.1, 92.3, 92.31, 92.41,
92.51, 92.55, 92.57, and 92.73, which provides regulations which govern point-source
discharges to Pennsylvania waters. These rules are applicable to the discharge of lagoon water to
Mauses Creek.

Pennsylvania Wastewater Treatment Regulations, Pennsylvania Code Title 25, Sections 95.1-3,
95.7, 95.9, outline regulations which govern wastewater treatment. These regulations are
applicable to the discharge of lagoon water to Mauses Creek and industrial reuse of the treated
water.

Pennsylvania Industrial Waste Treatment Regulations, Pennsylvania Code Title 25, Sections
97.1, 97.2, 97.14, 97.15, 97.81-83, outline regulations which provides reguirements and
standards for the treatment of industrial waste discharges to surface water. These regulations are
relevant and appropriate to the discharge of lagoon water to Mauses Creek.

Pennsylvania Special Water Pollution Control Regulations, Pennsylvania Code Title 25, Sections
101.1-2, which outlines regulations reguiring notification of downstream users in the event of a
release of toxic substances. These regulations are relevant and appropriate to the discharge of
lagoon water to Mauses Creek.

Pennsylvania Safe Drinking Water Regulations, Pennsylvania Code Title 25, Sections 109.201 -
203, which provide the reguired contaminant levels that must be met if water is to be used for
drinking water. These regulations are relevant and appropriate if the lagoon water is used for an
industrial purpose.

Pennsylvania Storm Water Management Act reguires that measures be taken to control
stormwater runoff during alterations or development of land. This Act is applicable to the
excavation and regrading that will take place on the Site.

Pennsylvania Erosion Control Regulations, Pennsylvania Code Title 25, Sections 102.4-24,
which outline reguirements that measures should be taken to control erosion and sedimentation
during remedial activities. These regulations are applicable to the excavation and regrading that
will take place at the Site.

Air Resources, Pennsylvania Code, Title 25, Sections 123.1, 123.2 and 127.1 which are
applicable to fugitive dust control and Best Available Technology (BAT). These regulations are
applicable to the air pollution control measures to be employed during the excavation and ex-situ
stabilization process as well as the LTTD operation.

C.   Cost-Effectiveness

The NCP reguires EPA to evaluate cost-effectiveness after first determining if the alternative
satisfies the threshold criteria:  Protection of human health and the environment and compliance
with ARARS. As indicated above the selected remedy meets the threshold criteria;  therefore the
cost effectiveness of the remedy is discussed below.

The selected remedy is considered cost-effective because the total costs are proportional its
overall effectiveness. The estimated present-worth cost for the selected remedy, including a
thirty year operation and maintenance cost, is $8,752,530. While the No Action Alterative and
Alternative 1 would be less costly to implement than the selected alternative  (Alternative 2), they
are less protective of human health and the environment and do not satisfy ARARS in some
cases. Also, alternative 1 in long term may not provide as much physical strength as alternative
2 which incorporates stabilization of Fluff waste. The increased compressive strength provided
by the stabilized Fluff will increase cap performance and life. The use of Alternatives 3,4, and 5
would potentially provide the same level of protection to human health and the environment as
Alternative 2, however, these alternatives are more costly and more difficult to implement than
the selected remedy. Implementation of Alternatives 6 and 7 would result in reducing the
potential for leaching of COIs to the groundwater through destructive removal at a much higher
cost than Alternative 2,3,4 and 5, but would pose a risk to on- and off- site receptors due to the
potential generation of dioxin contaminated material and cadmium/lead contaminated baghouse
ash, a characteristic hazardous waste.

-------
D.   Utilization of Permanent Solutions and Alternative Treatment Technologies to the
      Maximum Extent Practicable

EPA has determined that the selected remedy represents the maximum extent to which
permanent solutions and treatment technologies can be utilized while providing the best balance
among the other evaluation criteria. Of the alternatives that are protective of human health and
the environment and meet ARARs,  EPA has determined that the selected remedy provides the
best balance in terms of long-term effectiveness and permanence, reduction of toxicity, mobility,
or volume,  short-term effectiveness, implementability, cost, state and community acceptance.

The selected remedy addressed threats posed by the impacts at the Site. The remedy is protective
of human health and the environment, meets ARARs, and is cost effective.

E.   Preference for Treatment as a Principal Element

EPA has determined that the selected remedy represents the maximum extent to which
permanent solutions and treatment technologies can be utilized while providing the best balance
among the other evaluation criteria.

-------
                      MW Manufacturing Superfund Site
               Valley Township, Montour County, Pennsylvania
                          Responsiveness Summary

This community relations responsiveness summary is divided into the following
sections:

Overview:       A summary of EPA's selected remedy for Operable Unit
               5 (OU-5) at the Site.

Background:    A brief history of community interest and involvement during
               remedial activities at the Site.

Comments and   A summary of the comments, guestions, issues, and concerns
Responses:     received by EPA during the public comment period and EPA's
               responses to those comments, guestions, issues and concerns.

Overview

In order to better address the complex conditions at the MW Manufacturing Site, EPA
divided the Site into five separate areas called operable units (OUs).  Each OU,
described below, represents a different area of concern at the Site.

OU-1 - carbon waste sludge;
OU-2 - fluff waste, soils, storage tanks, lagoon water, and sediments;
OU-3 - contaminated ground water;
OU-4 - public water supply; and
OU-5 - fluff waste, soils, storage tanks, lagoon water, and sediments.

EPA completed the cleanup of OU-1 in 1992 and issued a Record of Decision  (ROD)
for OU-3 and OU-4 in 1993. In addition, after evaluating several clean-up alternatives
for OU-2,  EPA conducted a Focused Feasibility Study 1995, and chose to reevaluate
the remedy chosen for OU-2 in the ROD for OU-5.

In connection with the remedies considered for OU-5, EPA issued a Proposed
Remedial Action Plan (Proposed Plan) on August 12, 1997. The Proposed Plan
outlined several clean-up alternatives including EPA's preferred alternative. EPA's
preferred clean-up alternative includes:

   •      Excavating,  stabilizing,  and backfilling the fluff waste,  lagoon sediment,  and the
          surface soil;

   •      Treating  soils containing visible oil/solvent with low temperature thermal  desorption;

   •      Disposing of  tanks and drums off-site;

   •      Draining,  treating,  and discharging lagoon water to a tributary next to the Site;

   •      Covering  the  backfilled area with two feet of top soil and seeding;  and

   •      Limiting  future use of the area through controls such as deed restrictions.

After considering information received during the public comment period, EPA
selected this clean-up alternative for OU-5 and presented this in the Record of
Decision.  EPA believes that the selected remedy best meets EPA's evaluation criteria,
is protective of human health and the environment, and is cost effective.

Background

After releasing the Proposed Plan, EPA held a 30-day public comment period from
August 12, 1997, to September 11, 1997. During the public comment period, EPA
accepted written comments on the clean-up alternatives and held a public meeting on
August 27, 1997 to present the Proposed Plan for OU-5 to the community. The public

-------
meeting also provided an opportunity for community members to have their questions
and comments answered and documented in the public meeting transcript. EPA
announced the public meeting in the Press Enterprise and the Danville News on
August 12, 1997, and in a fact sheet mailed to the entire site mailing list. During the
meeting, EPA addressed citizen's comments and answered guestions on the clean-up
alternatives and future Site work.

Before selecting its preferred alternative as the final clean-up alternative for OU-5,
EPA considered all comments received during the public comment period, as well as
those voiced at the August 27, 1997 public meeting.

Community involvement and interest in the MW Manufacturing Site is extensive.
Although the potentially responsible parties  (PRPs) for the Site installed a waterline to
connect residents to the public water supply in 1996, the community is still very
concerned about contaminated ground water and the economic impact of the Site on
the community. In addition, EPA interviewed several community members in May
1997 to gather information about current community concerns regarding the Site and
its cleanup. EPA will use this information to revise the Community Relations Plan for
the Site and to better address the community's needs and concerns.

Comments and Responses

Comments Received During the Public Meeting

This section provides a summary of the comments, guestions, issues, and concerns
received by EPA during the August 20, 1997 public meeting. The comments and
guestions are grouped in the following categories:

1. Cleanup Schedule
2. Soil and Fluff Waste Cleanup/Stabilization Process
3. Ground Water and Lagoon Cleanup
4. Economic Impacts and Future Site Development
5. Technical and Potential Responsible Parties Comments

1. Cleanup Schedule

A few citizens expressed concern about the planned time table for Site cleanup.

EPA Response:  After receiving public comments, EPA will officially document a
clean-up decision in a Record of Decision (ROD) for OU-5. The ROD is a formal
document that describes the clean-up plan EPA will use to address contamination at
the Site. After issuing the ROD, EPA will reguire that the PRPs prepare a work plan
and implement the clean-up actions. EPA expects the soil stabilization and
construction of a ground water treatment system to be complete by the year 2000.
However, the ground water treatment system will operate for 30 years or until EPA's
clean-up standards are achieved.

A citizen asked if EPA will inspect the Site following clean-up activities
to determine whether the actions outlined in the ROD are working.

EPA Response:  When the design plan is finalized it will include a guality assurance
plan. The guality assurance plan is a schedule of routine testing and monitoring that
evaluates the success of the clean-up actions implemented. EPA will also conduct
long-term monitoring during the operation and maintenance of the clean-up actions to
ensure that clean-up goals EPA identified in the ROD are achieved.

2. Soil and Fluff Waste Cleanup/Stabilization Process

   •      A citizen asked if stabilization is a proven process;   if it has been tried with
          the same materials found at the Site;  and if it was successful.

EPA Response:  Stabilization is an established process that involves mixing waste
material with another substance to solidify and immobilize the chemicals in the waste.

-------
Once the waste is solidified, water infiltration is reduced significantly reducing the
ability of contaminants to leach out. The stabilization process has been implemented
using different kinds of materials with different characteristics, and it has worked very
well. Although the process has not been implemented with the exact waste material
found at the MW Manufacturing Site, fluff and contaminated soil from the site have
been successfully stabilized in lab testing.

The stabilization process is often based on site-specific material. For example,
contaminated soil can be stabilized using plain lime. The lime naturally stabilizes the
soil and prevents chemicals from moving through the soil into the ground water.
Cement is being used to stabilize the waste material at the MW Manufacturing Site
because the material contains small pieces of hard copper wire. Studies showed that
the cement mixture has low permeability, good strength, and longevity which will
stabilize the waste and prevent it from causing further contamination.

   •      A citizen asked what happens to the stabilized material.

EPA Response:  Once the material is stabilized it will be put back into the ground
and covered by two feet of clean soil.

   •      A citizen asked if contaminants will travel through the stabilized fluff,  and
          if so,  does that mean that the contaminants are undetectable,  or that they
          are below EPA standards.

EPA Response:  The stabilized soil and fluff will be impermeable, like a rock,
therefore immobilizing the contaminants, However, like a rock, the stabilized material
may crack if it is exposed to corrosive material. EPA will monitor the area to make
sure this doesn't happen.

Of the principal contaminants found in the fluff (lead, bis(2-ethylhexyl)  phthalate
(BEHP),  di-n-octyl phthalate and copper) only copper, which is relatively less toxic,
has been detected the ground water in appreciable amount. Therefore,  even prior to
stabilization, the leaching of the principal toxic compounds from the fluff material is
not occurring.

   •      A citizen asked how long the finished product (stabilization)  will retain
          its guality of impermeability.

EPA Response:  Combining the contaminated soil and fluff with cement solidifies the
materials into a rock-like substance. This substance may crack, but it will still remain
impermeable. EPA will continue to monitor the stabilized materials and perform
routine tests to ensure the clean-up plan's long-term effectiveness.

   •      A citizen asked why EPA doesn't transport the stabilized material to a
          landfill or some other location.

EPA Response:  EPA considered moving the material off-site, however,  several
factors made it unfeasible:

   •      Heavy truck traffic involved in transporting the contaminated materials creates the
          possibility of spills or accidents;

   •      The ground water at the site is already contaminated.  Therefore,  moving the
          stabilized material would not enhance the use of the Site because there will still be
          restrictions imposed regarding future development on the site as a result of the
          ground water contamination; and

   •      The material would present the same issues to the community where it was moved.
          A citizen asked whether EPA will consider and address the aerosols
          particles)  that might be generated during the soil removal and

-------
          stabilization process.

EPA Response:  The actual stabilization will be done in a portable enclosed structure
on the site. The contaminated soil and fluff will be transported into the enclosed
structure and mixed with the cement inside. The air inside the enclosed structure will
then be treated through a ventilation system before it is released to the environment.
The only time dust will be generated from the soil and fluff will be during the
transportation into the enclosed structure. In order to control this dust,  the material
will be sprayed with water. In addition, there will be constant real-time air monitoring
performed during all clean-up actions at the Site. If elevated levels of contamination
are detected in the air, all operations will cease.

The stabilization process is designed to provide three layers of protection to both
residents and on-site workers. First, the process will be conducted in an enclosed
structure;  second, the workers will wear protective clothing inside the structure and the
air coming out of the structure will be cleaned;  and third, the air outside the work area
will be constantly monitored to ensure safe levels. These procedures will be
implemented the entire time the stabilization process is being implemented.

   •      A citizen asked how water runoff will be handled once the soil and fluff
          are stabilized and the area is re-capped.

EPA Response:  Prior to designing the actual stabilization plan, engineers will
consider the annual rainfall and expected runoff for the Site. It is probable that
drainage pipes will be built on the Site to discharge the runoff into a nearby creek.
The runoff water from the Site will not become contaminated because it will not pass
through the stabilized contamination.

   •      A citizen summarized the current plan,  noting that the previous plan to
          use incineration is no longer an option:  EPA will excavate contaminated
          soil,  combine the soil with the fluff material,  mix both with Portland
          cement,  put the mixture under the ground, cover the mixture with soil and
          vegetation,  and then install a drainage system so the water flows away
          from the Site.

EPA Response:  EPA agrees that this is an accurate assessment.

3. Ground Water and Lagoon Cleanup

   •      A citizen asked what will happen to the contaminated water in the lagoon on the  Site.

EPA Response:  First the water in the lagoon will be analyzed to determine if it is
contaminated. If the water is not contaminated, then it will be legally discharged into
a nearby stream or creek, probably Mauses Creek or Mahoning Creek. If the water is
contaminated, it will be pumped to a water treatment system where it will be cleaned
to Clean Water Act and Clean Streams Law standards and then discharged into a
nearby stream or creek.

   •      A few citizens asked if there is going to be a water treatment system
          installed at the Site and if the water pumped up from the ground will go
          through some type of treatment process before it is discharged into a
          stream or creek. And if so, how many wells have been or will be drilled.

EPA Response:  EPA has determined that the ground water at the Site is
contaminated and that it is likely that a water treatment system will be used to treat the
groundwater and possibly the water in the lagoon. However, a ground water treatment
system has not yet been designed, so no extraction wells have been drilled and the
total number of wells needed will not be determined until a system is designed.

   •      A citizen asked where the ground water system will be built.

EPA Response:  The exact location of the ground water system cannot be determined
until the system is designed; however, the system will likely be built in an area of the

-------
site where future development is restricted. Once the ground water treatment system is
built, a fence will be erected around the system to restrict access.

   •      A few citizens  expressed concern about the amount of water that will  be
          pumped from the ground and how this will affect the wells in the area.

EPA Response:  According to a recent study conducted by the PRPs, pump tests
showed that an estimated volume of 12 to 20 gallons per minute can be pumped out of
extraction wells without adversely affecting other wells in the area. This amounts to
about 25,000 gallons per day. The alternative outlined in the ROD is a conceptual
design based on site investigations and studies. During the Remedial Design, EPA
will determine specifications for each clean-up action and make sure that they do not
adversely impact the community.

Before a ground water treatment system is constructed, there are additional tests and
studies needed to determine how the system is affecting the ground water level. These
studies can determine even the slightest drop in the ground water level. The wells
outside the area where the pumping will be occurring will be monitored to ensure that
the extraction wells are not adversely affecting the water level in these wells.  Also,
the actual ground water system will be routinely monitored.

   •      A citizen asked if EPA can project how long the ground water remediation will last.

EPA Response:  It is hard to predict how long the ground water remediation will last
until the system is operating. Once the groundwater treatment system is operating,
sampling results will provide data that can be analyzed to determine the rate at which
the groundwater is being cleaned. This data will also provide an estimate of how long
the groundwater system will need to operate to reach EPA's clean-up levels.

It is also hard to predict the length of the groundwater cleanup because the solvents
that are contaminating the groundwater are dense non-agueous phase liguids  (DNAPL).
DNAPLs are not easy to capture during a pump and treat cleanup because the
DNAPLs enter fractures in the bedrock and are difficult to extract. Once in the
bedrock fractures, the DNAPLs serve as a constant source of continued contamination.
This makes it hard to predict how long groundwater remediation will last.

4. Economic Impact and Future Site Development

   •      A few citizens  expressed concern about the future development of the  site.
          One citizen compared it to a nuclear waste dump and commented that
          stabilization seems like the cheapest or easiest alternative.

EPA Response:  EPA will place restrictions on the property that will limit the future
use of the property. Such restrictions will include fencing the 8-acre area of
stabilization. Because the ground water at the site is contaminated, and the ground
water clean up process will be on-going for some time. EPA chose this alternative
because it best satisfies EPA's cleanup standards including:

Threshold Criteria
Overall protection of human health and the environment
Compliance with applicable laws

Balancing Criteria
Long-term effectiveness and performance
Reduction of toxicity, mobility, and volume through treatment
Short-term effectiveness
Ability to implement
Cost

Modifying Criteria
State acceptance
Community acceptance.

-------
    •      A citizen expressed concern over  the  economic  impact  caused  by  the
           appearance of the Site,  and asked when the building located  on  the  site
           will be demolished.

 EPA Response:   EPA is in the process of issuing an Administrative Order to the Site
 owner regarding the building. The Administrative Order reguires the Site  owner to
 demolish and remove the building.  Once EPA issues the Administrative Order,  the
 Site owner will have a 60-day period to respond to the Order or negotiate with EPA.
 EPA expects the building to be demolished by Spring 1998.

        Written Comments Received During the Comment Period

 1.     It should be clarified that the dioxins and furans [are]  formed (and unable
        to be destroyed) as part of the incineration process,  rather than  being
        contained in the fluff material that is  subject to stabilization.

 EPA Response:   EPA agrees that detections of the Dioxins and Furans in the pilot
 incineration testing were due to formation of dioxins and furans as by products of the
 combustion. EPA has modified texts in the ROD in Section IV B3 b on page  12.

 2.     Combining Portland cement, which contains lime, with the elements of
        cooper and lead could lead to precipitation of these metals and promote
        leaching of the metals to the groundwater.

 EPA Response:   Alkaline compounds such as lime  (calcium oxide)  and cement
 (anhydrous calcium silicate)  act as binders and immobilize many inorganic compounds
 including lead and copper. Alkaline compounds keep pH levels high in the  solidified
 waste which prevents leaching by converting metals into insoluble metal hydroxides.
 EPA has identified solidification and stabilization using cement as a Best
 Demonstrated Available Treatment Technology (BOAT)  for metal containing waste.
 (EPA/530/R-93/012 June 1993.)

3.     The removal of junk and debris from the Site is appropriate but the
       responsibility for this activity should be with the Site owner.

 EPA Response:   The Record of Decision is a decision document that is intended to set
 forth EPA's chosen remedial action to be implemented at a site. Discussions of
 individual parties' liability is not appropriate in the Record of Decision.  The
 Superfund statute defines liability for various classes of parties, and EPA will negotiate
 with potentially responsible or consider other  appropriate enforcement actions in  the
 context of its enforcement process.

4.     The description of preferred alternative includes placement of a cover that
       meets PADEP Residual Waste cover reguirements. It is Nassau
       understanding that the stabilized material will have two-foot soil  cover
       placed over it that is vegetated to prevent the ponding of liguids  and
       minimize erosion. Although the estimated  area of the two-foot cover is  8
       acres, the final configuration of the area subject to soil cover will be
       determined during the remedial design phase of the project.

 EPA Response:   During the prepublic meeting with Nassau, the Commonwealth of
 Pennsylvania and local township representatives,  it was determined that the most
 environmentally sound approach would be to extend the soil cover over the entire area
 inside the MW Manufacturing fence to make certain no area is left exposed which
 could pose any public health threat. In addition, the full soil cover would maintain the
 aesthetics of the land. This position was discussed at the public meeting,  and was
 depicted in a graphic prepared by Nassau.

 5.     The total risks presented in the Proposed Plan Table 1 represent EPA's
        assessment of the cumulative risk or hazard indices for chemicals  of
        concern in fluff material and surface soil based upon the worst case
        residential; exposure scenarios presented in Appendix D of the  Re-
        Evaluation of the Risk Assessment dated  May 1995. However, the  non-

-------
       carcinogenic risk estimates of 1.42  (adult plus child) and 4.63  (child) for
       exposure to soil is not equal to the total cumulative non-cancer risk, and it
       is unclear what this number represents. The risk estimates in the Re-
       Evaluation of the Risk Assessment dated May 1995 were representative of
       exposure scenarios that were considered to be "reasonable exposures" for a
       residential receptor rather that a "worst case". Evaluating risks related to
       reasonable exposure scenarios is considered to be more appropriate than
       estimating the potential risk for a hypothetical resident considering the low
       potential for future land use to be residential.

EPA Response:  There are three issues as follows to address in this statement:
(1) As stated in the Proposed Plan, Table 1 is a representation of the total risk for
Chemicals of Concern (COCs) in fluff material and surface soil based on a future
residential land use scenario. Residential areas exist near the MW Manufacturing Site,
therefore, the evaluation of risk to future potential residents was warranted. The total
non-cancer risk for the residential scenario is a summation of the risks associated with
those COCs that possess non-cancer risks in fluff material  (polychlorinated biphenyls
(PCBs),  antimony, and copper)  and in the surface soil  (PCBs and copper). It should be
noted that the non-cancer risks identified as "Total Estimated Hazard" found in
Appendix D of the Re-Evaluation of Risk Report (1996) are not correct. The "Total
Estimated Hazard" for surface soil and fluff material as reported in Appendix D is
actually the risk associated solely with PCBs and copper, respectively.

(2) To address the issue of "reasonable" versus "worst case" exposure scenarios it is
important to understand the definitions of these scenarios as presented in the Re-
Evaluation of Risk Report and in EPA Guidance. The "reasonable" exposure in the
Report corresponds to a "central tendency" estimate of the risk as defined by EPA.
This estimate can be defined as the average risk. The "worst case" exposure in the
Report corresponds to a "reasonable maximum exposure (RME)" estimate of the risk
as defined by EPA. The RME estimate is defined as the highest exposure that is
reasonably expected to occur at a site [Risk Assessment Guidance for Superfund
(RAGS):   Human Health Evaluation Manual (Part A)/EPA/1989] and, therefore,
corresponds to the potential risk to sensitive subgroups or populations. EPA
recommends that both the central tendency risk estimate and the RME risk estimate be
determined for Superfund sites (Guidance on Risk Characterization for Risk Managers
and Risk Assessors/EPA/1992).  The RME exposure scenario is the preferred risk
scenario for the determination of human health risk  (RAGS/1989).

(3) It should be noted that both future residential and future Industrial exposure
scenarios should have been evaluated in Appendix D of the Re-Evaluation of Risk
Report.  Unfortunately,  the future industrial exposure was not calculated in the Re-
Evaluation of Risk Report. For this reason, EPA,  in the Proposed Plan, made a
determination of the potential risk to a future industrial worker exposed to current Site
conditions.

6.  The cleanup goals in the Focused Feasibility Study dated May 1995 were
    developed for those chemicals of concern demonstrating carcinogenic risk
    estimated in excess of 10 -6 or non-cancer hazard quotients greater than 1
    for future residential exposure. The Proposed Plan states that cleanup
    levels for fluff and surface soil were developed for the Site contaminants
    (BEHP[bis(ethylhexyl)phthalate], PCBs[polychlorinated biphenyls], copper
    and antimony) that present unacceptable risk estimates for routine
    exposure under an industrial land use scenario. However, the Proposed
    Plan uses EPA Region III risk-based Remedial Action Levels. Based on a
    site-specific industrial use scenario,  the only chemicals of concern in
    surface soil that would warrant development of risk based cleanup levels
    are BEHP, and perchloroehtylene (PCE).  However, BEHP is not
    considered a chemical of concern since it appears at the Site in an inert
    form  (plastic) and was found to be immobile in the leachability studies as
    presented in the Fluff Leacability Testing Summary Report dated August 1994.

EPA Response:  The COCs in surface soil were determined by EPA based on the
RME scenario for a potential industrial worker as explained in the response to

-------
    Statement 5. The COCs are tetrachloroethylene (PCE),  PCBs,  BEHP, antimony,  and
    copper. The cleanup level for PCE was omitted from the Proposed Plan. Site-specific
    cleanup levels for these compounds will appear in the Record of Decision. BEHP is