Lean in Government
Starter Kit ver
How to Implement Successful Lean Initiatives at
Environmental Agencies
llppsff^
^feiMJ.
^
-------
THE LEAN
Working Smart for Environmental Protection: Improving State Agency Processes with Lean
and Six Sigma
Lean in Air Permitting Guide: A Supplement to the Lean in Government Starter Kit.
Case studies and other information about EPA and State Lean activities can be found at
EPA's Lean and Environment website (www.epa.gov/lean).
NCE1
Lean in Government Starter Kit
-------
We are pleased to announce the release of version 2.0 of the Lean in Government Starter Kit. In
the spirit of Lean and continuous improvement, version 2.0 (released May 2009) builds on the
information, guidance, and resources included in the original Starter Kit published in 2007. In
particular, version 2.0 includes new and expanded sections and resources on metrics, Lean event
follow-up, and strategic deployment of Lean within an agency.
This Starter Kit was developed through a collaborative process involving representatives from
five States—Delaware, Iowa, Michigan, Minnesota, and Nebraska, the Environmental Council of
the States (www.ecos.org), and the U.S. Environmental Protection Agency (www.epa.gov).
EPA's National Center for Environmental Innovation (NCEI) provided advisory and contractor
support to this effort. Ross & Associates Environmental Consulting, Ltd. (www.ross-assoc.com)
prepared this Starter Kit under subcontract to Industrial Economics, Inc. (EPA Contract # EP-W-
04-023 and EP-W-04-093).
The EPA-state workgroup coordinating the development of this Starter Kit included the
following agencies:
• Delaware Department of Natural Resources and Environmental Control
(www.dnrec.delaware.gov)
• Iowa Department of Management (www.dom.state.ia.us)
• Michigan Department of Environmental Quality (www.michigan.gov/deq)
• Minnesota Pollution Control Agency (www.pca.state.mn.us)
• Nebraska Department of Environmental Quality (www.deq.state.ne.us)
Special recognition should be given to the Iowa Department of Management's Office of Lean
Enterprise. Many of the resources in this Starter Kit are based on resources that have been
prepared for agency managers in Iowa (these resources are available at http://lean.iowa.gov).
Version 2.0 of this Starter Kit includes more recent input from the Environmental Council of the
States (ECOS) and state environmental agencies. Additionally, this version draws on experience
and lessons with Lean implementation shared by representatives at EPA and other federal
agencies who have used Lean.
Lean in Government Starter Kit
-------
-------
T:
Chapter 1. Introduction 1
Getting Started with Lean 2
Implementing Lean Events 2
Sustaining and Diffusing Lean Activity 3
Chapter 2. Getting Started with Lean 5
What Is Lean? 5
Why Do Lean? 8
How to Select a Lean Project 11
How to Find Technical Assistance for Lean Efforts 14
Chapter 3. Implementing Lean Events 15
Lean Event Planning 15
Lean Event Implementation 29
Lean Event Follow Up 34
Chapter 4. Sustaining and Diffusing Lean Activity 41
Sustaining Lean Improvements 41
Understanding the Lean Journey 42
Getting Started with Lean Diffusion 44
Four Deployment Models for Lean Diffusion 48
Future Directions—Building a Lean Continual Improvement Agency 49
Concluding Thoughts 51
Appendix A. Bibliography of Lean References 53
Lean Government Resources 53
Appendix B. Resources 57
Lean in Government Starter Kit
-------
GUIDE TO RESOURCES IN THE LEAN IN GOVERNMENT STARTER KIT
This Starter Kit contains three types of resources:
*=> Practical guidance and background information on how to use Lean
methods to improve agency processes (Chapters 1-4)
o Look for "Resources" textboxes throughout the document for links
to supporting tools in the Appendices
•=> Bibliography of Lean References (Appendix A)
•=> Resources, tools, and templates to support agency Lean
implementation efforts (Appendix B), covering the following topics:
o Getting started with Lean
o Event planning
o Lean event implementation
o Lean event follow-up
o Sustaining and diffusing Lean activity
This website version of the Lean in Government Starter Kit contains
downloadable versions of all the resources in Appendix B. You may access the
Starter Kit webpage through EPA's Lean and Environment website
(www. epa. gov/lean) and through the website of the Environmental Council of the
States (http://www.ecos.org/content/project/detail/2292/).
Lean in Government Starter Kit
-------
Since 2003, several state environmental agencies and the U.S. Environmental Protection Agency
(EPA) have achieved impressive results improving government processes using Lean methods.
Numerous other federal, state, and local government agencies have also turned to Lean to
improve the effectiveness, efficiency, and transparency of government programs and services.
Environmental agencies have used Lean methods to advance their mission—protecting human
health and the environment—in better, faster and cheaper ways. This Lean in Government
Starter Kit- Version 2.0 is designed to assist interested government agencies in planning and
implementing successful Lean improvement events. The Starter Kit builds on ideas presented in
Volume 1 of EPA and EGOS' Lean in Government Series, Working Smart for Environmental
Protection: Improving State Agency Processes with Lean and Six Sigma.
The Starter Kit contains practical tools, resources, and tips for:
• How to get started with Lean;
• How to implement and manage the phases of a Lean event; and
• How to sustain and diffuse Lean activity within an organization.
The Starter Kit answers questions to help agency managers determine whether Lean is right for
their agency, and presents ideas for agencies interested in expanding their Lean initiatives. Each
section includes a set of downloadable resources that can be tailored to meet the specific needs of
an agency.
Conducting a Lean improvement event is an eye-opening experience for agencies just getting
started as well as agencies with significant experience implementing Lean. The rapid, dramatic,
and transformative improvements that several public environmental agencies have achieved in
recent years using Lean has piqued the interest of many more agency managers—even in large
governmental agencies. At the same time, this excitement raises important questions:
How can we get started with Lean?
How do we implement Lean events?
How can we sustain and diffuse the successes of our initial Lean activity?
Organized around three topics—getting started with Lean, implementing Lean events, and
sustaining and diffusing Lean activity within an agency—this Starter Kit provides practical
answers to questions that are likely on the minds of government agency managers. The Starter
Kit focuses on ways to ensure that initial time and resource investments in Lean are highly
successful. As some agencies are painfully aware, one or two poorly planned and executed Lean
events can sour the agency on Lean and undo past progress. Conversely, a few well-executed
Lean in Government Starter Kit | Page 1
-------
Lean events can transform how agency personnel think about what is possible to achieve in
terms of excellence in government.
Chapter 2 introduces Lean methods, explains how Lean is different from other initiatives, and
helps agency decision makers consider whether Lean is right for their agencies. Key topics
include:
• What Is Lean?: Lean is a process improvement approach and set of methods that seek to
eliminate non-valued added activities or waste. Lean kaizen events enable rapid,
breakthrough improvements in as little as a few days, while creating a continual
improvement culture. Kaizen means "to change for the good of all" in Japanese.
• Why Do Lean?: Lean can dramatically improve the performance and effectiveness of
agency processes in a relatively rapid time frame. Lean increases transparency and
actively engages employees in finding ways to work better and smarter.
• How to Select a Lean Project: Focus Lean improvement efforts on processes with the
most "pain" or the greatest perceived problems or in areas where there are supportive
champions.
• How to Find Technical Assistance for Lean Efforts: There are a variety of technical
assistance providers that exist to assist agencies through Lean implementation.
Lean event implementation consists of three phases: event planning, event implementation, and
event follow-up. Chapter 3 provides guidance, resources, and tips for conducting a Lean event
from start to finish, including:
• Event Planning: This phase ensures that a Lean event is well scoped and planned. From
team selection to logistics to communication, preparation is essential for a productive
Lean event.
• Event Implementation: Each Lean event is a journey that requires skilled facilitation and
guidance as well as hard work from a committed team.
• Event Follow-up: Once the event has ended, effective follow-up is essential to complete
remaining action items, to prevent backsliding, and to sustain the team-based focus on
continuous improvement.
Lean in Government Starter Kit | Page 2
-------
Once your agency has completed a Lean event, it is important to think strategically about how to
sustain the improvements and, if desired, diffuse Lean throughout your agency. Chapter 4
discusses four models for deploying Lean in an organization, along with specific steps to
sustaining and diffusing Lean activity. The chapter also discusses key strategies for getting more
value out of Lean and for building a strong continual improvement culture across an agency.
The possibilities are exciting, whether you plan to use Lean for targeted problem-solving or to
transform the culture of your agency. Whatever your path, this Starter Kit will help you get the
most out of your Lean events and activities.
Lean in Government Starter Kit | Page 3
-------
-------
2. with
As your agency considers getting started with Lean or begins its Lean journey, you will likely
encounter questions from managers and staff. This chapter discusses some of these common
questions and topics, including:
What is Lean?
Why do Lean?
How to select a Lean project
How to find technical assistance for Lean efforts
Is
Lean refers to a collection of principles and
methods that focus on the identification and
elimination of non-value added activity
(waste) involved in producing a product or
delivering a service to customers.1 While
Lean process improvement approaches were
developed originally for use in the private
sector to target manufacturing processes,
there has been steady progress towards
adapting these approaches for use on service
and administrative processes. The adjacent
textbox lists examples of Lean wastes
relevant to administrative processes. Public
sector interest in Lean is increasing rapidly,
fueled by strong improvement results and in
some cases, economic hardship. Lean
methods include value stream mapping and
kaizen events; Six Sigma refers to a set of
tools that is increasingly used in
conjunction with Lean. It is often said that
Lean is "common sense uncommonly
applied."
Inventory
Overproduction
Complexity
Backlog of work (permits, plan approvals),
excess materials/info, obsolete
databases/files/folders
Data errors, missing info, errors in
documents, confusing instructions or
requirements, typos
Unneeded reports and copies, excess e-
mail messages, doing work not requested
Unnecessary process steps, too many
signature levels, unclear job descriptions
Time for approval cycles, waiting for
information or decisions, waiting for
people in meetings
Trips to printer and copier, unnecessary
movement to find files or supplies, travel
to meetings
Report routing, transport of documents,
document storage
Value Stream Mapping (VSM). Value stream mapping refers to the activity of developing a
high-level visual representation, from start to finish, of the process flow involved in delivering a
1 James Womack, Daniel Jones, and Daniel Roos coined the term "lean" in their 1990 book The Machine that Changed the World
to describe the manufacturing paradigm (often referred to as the Toyota Production System) developed by the Toyota Motor
Company based on principles pioneered by Henry Ford.
Lean in Government Starter Kit | Page 5
-------
desired outcome, service, or product (a "value stream") to customers. In the context of
environmental agencies, a value stream could be the process of enabling redevelopment of
brownfield sites or attracting and hiring new agency staff. The typical products of a two to five
day VSM event are two maps—a "current state" map of the targeted processes (see photo below)
and a "future state" map of the desired process flow—and an implementation plan for future
process-improvement activities. Because value stream maps help people see not only waste but
the source of the waste, they enable an agency to target future kaizen improvement events on
specific processes or process steps in the value stream to help move the agency towards its
desired "future state" value stream map.
Kaizen Events. Kaizen is a combination of two
Japanese words: kai meaning "to change" and zen
meaning "for the good of all." Kaizen is founded on
the belief that small, incremental changes routinely
applied and sustained over a long period result in
significant performance improvements. Kaizen
events—also called rapid process improvement events
or kaizen blitz events—focus on eliminating waste in a targeted system or process, improving
productivity, and achieving sustained improvement. Though sometimes kaizen events are as
short as two days, they often last about five days. Whereas VSM events focus on the big picture
and future directions, kaizen events dig deep into the specific steps of a process to identify
sources of waste and implement process changes.
Current State Ma
Lean Overview Presentation
Lean in Government Starter Kit | Page 6
-------
Six Sigma. Six Sigma is often used in conjunction with Lean, but is a distinct process-
improvement methodology that uses a collection of statistical tools to analyze causes of variation
in a process and to identify and test improvements. Trained Six Sigma experts, called "black
belts" and "green belts," typically support teams in using Six Sigma tools in a project context.
While this Starter Kit does not focus much on Six Sigma, Lean and Six Sigma methods can be
effectively combined (often called "Lean Six Sigma"). Lean eliminates unnecessary time and
process wastes, while Six Sigma targets quality improvements and variation.
What Other Tools Are in the Lean Toolbox?
Along with value stream mapping, kaizen events, and Six Sigma, agencies are using a variety of
other Lean tools, such as the following.
• 5S: 5S is an improvement process involving five steps (Sort, Set in order, Shine,
Standardize, and Sustain) to create and maintain a clean, neat, and high-performance
workplace. 5S is often used to ready the workplace for future kaizen events and
continual improvement efforts. Some organizations add a sixth "S" for Safety.
• Standard Work: Standard work represents the sequence of activities needed to perform
a given operation. Improvements made during kaizen events are immediately
documented as standard work to ensure that all employees understand and consistently
implement the new process.
• Visual Controls: Visual controls are used to reinforce standardized procedures and to
display the status of an activity so every employee can see it and take appropriate action.
Visual controls are frequently implemented during kaizen events to simplify the
workplace and provide visual feedback on process performance.
HOW TO LEARN ABOUT LEAN
• Read Working Smart for Environmental Protection, which provides additional information on Lean methods,
describes the activities and lessons learned from several state Lean efforts, and includes contact information
for staff involved in those efforts. You can find this publication and additional information on public agencies
and companies implementing Lean at EPA's Lean and Environment website (www.epa.gov/lean) and on Lean
Project page of the Environmental Council of the States' website
(http://www.ecos.org/content/proiect/detail/2292/).
• Consult the bibliography (Appendix A) of this Starter Kit for a list of resources and websites geared towards
agencies interested in learning more about Lean principles and methods.
• Go to EPA's Lean Government website for more information and case studies on federal and state
environmental agencies using Lean (www.epa.gov/lean/admin.htm), including a Lean in Air Permitting Guide
focusing on air permitting examples.
1 Talk to other agencies implementing Lean. Agencies are generally excited to share their experiences and can
be helpful resources for agencies considering Lean.
Lean in Government Starter Kit | Page 7
-------
Lean can dramatically improve the performance and effectiveness of agency processes in a
relatively short timeframe (see textbox for a list of typical benefits from Lean). The impressive
results from environmental agency Lean efforts also speak for themselves. Here are a few
examples:
• EPA's Office of Water, EPA Region 7, and four States (Iowa, Kansas, Missouri, and
Nebraska) are using Lean to significantly improve water quality standard (WQS) setting
and NPDES processes, reducing WQS process steps from 50 to 26 (a 48 percent
reduction), cutting the length of the process from a few years to several months.
• Delaware Department of Natural Resources and Environmental Control lowered a
backlog of air construction permits from 199 to 25, while reducing the average permit
processing time to less than 76 days.
• Iowa Department of Natural Resources streamlined the corrective action process
activities in the Leaking Underground Storage Tank program, reducing the number of
decisions by 80 percent and the total number of process steps from 43 to 26 (a 40 percent
reduction). This dropped the average decision-making timeframe in the program from 38
months to 3 months.
• Michigan Department of Environmental Quality decreased the time needed to process
major air construction permits from 422 days to 98 days. Quality also improved, with
initial application administrative completeness rising from 82 to 95 percent.
• Vermont Agency of Natural Resources decreased the time needed to process an on-site
wastewater permit from as high as 542 days to 34 days (a 94 percent reduction) and cut
the number of steps in the permitting process from 150 to 38.
States achieved these results by using value stream mapping, kaizen events, and other Lean
methods. Because of their initial success with Lean, these agencies have also conducted Lean
events on a range of other processes.
By using Lean tools, an agency can expect to:
• Eliminate or dramatically reduce backlogs
• Reduce lead times by more than 50%
• Decrease the complexity of processes and eliminate unneeded process steps
• Improve the quality and consistency of work products and activities
• Allocate more staff time to "mission critical" work
• Improve staff morale
• Enhance process transparency to internal and external audiences
Lean in Government Starter Kit | Page 8
-------
Example Improvements in Air Permitting Timeframes Resulting from Lean Events
Idaho Department of
Environmental Quality
Indiana Department of
Environmental
Management
Iowa Department of
Natural Resources
Iowa Department of
Natural Resources
Michigan Department
of Environmental
Quality
Michigan Department
of Environmental
Quality
Permit to construct
Title V permit
modifications
Standard air quality
construction permits
Air quality complex
permits
Major air
construction permits
Minor air
construction permits
270
164
62
214
422
143
97
144
6
180
98
50
173
20
56
34
324
93
Lean is different from past improvement efforts in several key ways. Lean:
• Takes a "customer service" perspective that seeks to optimize value delivered to the
environment, the public, and the regulated community;
• Involves employees and external stakeholders in continual improvements and problem-
solving activities;
• Deploys a rapid continual improvement framework that emphasizes implementation
rather than prolonged planning;
• Seeks to reduce the complexity of processes; and
• Uses metrics and visual controls to provide rapid feedback to improve real-time decision-
making and problem-solving.
By eliminating non-value added activities, environmental agencies can redirect staff time to
higher-priority activities related to their core mission of environmental protection.
Lean in Government Starter Kit | Page 9
-------
Resources
Lean Inventory
Using Lean to achieve process excellence is a growing
trend among state and federal government agencies,
including those focused on environmental protection.
The 2006 Working Smart for Environmental
Protection primer looked in depth at the Lean
experiences of five state environmental agencies, all of
which have continued with Lean implementation
efforts. In addition, as of May 2009, there are about 20 state environmental agencies that have
conducted Lean events or are planning Lean events in the near future (See "Inventory of State
Lean Events" at ECOS website: http://www.ecos.org/content/project/detail/2292/). The map
below displays state environmental agencies that have conducted Lean events or shown interest
in using Lean methods to improve government processes as of May 2009.
Lean and State Environmental Agencies
State Lean Eventa Compiled' Stale Interested in Lean
Ki
MO KY
NC
Events EPA is aware of as of May 2009.
Lean in Government Starter Kit | Page 10
-------
ISN'T LEAN JUST THE OF THE
If your agency is typical, most management trends that have come around in the last fifteen years have been
tried. Total Quality Management? Continuous Quality Improvement? What makes Lean any different? Isn't this
just the latest way for consultants to line their pockets? There are some key differences.
Remember TQM? After several days of training on what seemed like obtuse principles, staff were sent back to
their regular duties and told to improve the quality of their work process. No one typically thought their process
was broken so there wasn't a lot of incentive to change anything and besides, they were already behind from all
those days in training. Once a TQM team was formed, they likely met once a week for six months or until they
forgot why they were meeting. If the team ran into conflict about what the "problem" was or how it might be
solved, there was a good chance team members started dropping out and the team dissolved. Kaizen teams
receive a half-day of just-in-time training and learn how to improve their process by actually making changes
directly to the process. Events never last for more than five days (including the training time) and kaizen events
can be as short as one or two days. Kaizen team leaders push the team through the cycle of change, and
conflict if it arises, to ensure a successful conclusion.
TQM teams developed a list of recommendations and sent them up the chain of command. If they were lucky,
they heard back from the powers that be and some of their recommendations might be implemented—eventually.
Kaizen teams are empowered and actually change the process during the course of the event. Management is
kept abreast of what is happening in the event but the team has the authority, and the expectation, to change the
process. (Sound scary? Letting a team change things on their own? Remember, the team is changing process,
not policy.)
Another significant difference is that TQM focused exclusively on quality while Lean addresses quality, cost, and
delivery simultaneously and all in the context of time. All of these components play a crucial role in the success
of our work and are inextricably linked. Additional distinctions include kaizen team composition (ensuring that the
customer is part of the team), standardized follow-up to the event at 30, 60 and 90 day intervals, and gathering
data as pre-work rather than during the improvement process.
TQM wasn't bad in theory but it lacked in execution. Lean is all about execution—getting good improvement
ideas implemented in a rapid timeframe and then making adjustments to continually improve. The
implementation results experienced by government organizations using Lean suggests that Lean will become a
core improvement strategy for many agencies.
to a
Most agencies begin their Lean implementation efforts with a pilot project (a kaizen event or
value stream mapping event) to improve an existing agency process. If this is your agency's first
event, it may be useful to start with a relatively simple permitting process (e.g., air construction
permitting for minor sources or a permit modification process) or even an internal process (e.g.,
audit action tracking), to get a feel for Lean methods. The selected process should be sufficiently
important to capture organizational attention. It is critical to start with a process area where there
is a high level of management support and commitment to ensuring a successful Lean event.
However, other circumstances may dictate which process is the best candidate for a Lean event.
For example, it may make sense to hold the Lean event in conjunction with another major
change within the agency during the implementation of a new rule or major staffing changes.
Lean in Government Starter Kit | Page 11
-------
Although each agency weighs its own criteria to select a target process for a Lean event,
agencies often focus initial Lean events on processes that have the most "pain," that is, the
greatest perceived problems. Problems could include backlogs, bottlenecks, complaints, funding
constraints, and quality and performance concerns. It is also important to consider improvement
projects that could free staff capacity to address mission-critical work, address stakeholder
concerns, or alleviate budget or fiscal pressures. Once an agency has conducted several events, it
often makes sense to take a more strategic approach to selecting events that is linked to the
agency's strategic plan and workforce development goals.
Potential criteria for project and process selection include:
' Funding concerns . Administrative bottlenecks and
• Degree of criticality to agency delays
mission • Existence of a project "champion"
• Number of customer and staff c, ff •,,• ,
, . • Staff willingness and energy
complaints
.... • Process type (frequency and
' Productivity problems variation)
• Backlogs and amount of work in
progress (WIP)
When selecting areas to target with Lean, it is also important to keep in mind that there are
different types of government processes. While all processes can benefit from Lean
implementation, the types of Lean results—time, quality, and cost—can vary depending on the
type of government process that is targeted. Quick, impressive process improvement results are
often important for building organizational support and momentum, while freeing resources and
time to focus on more mission-critical work. While applying Lean to more complex processes
may not yield quick time and cost savings, sustained focus on Leaning complex processes may
yield dramatic improvements in the agency's ability to achieve its mission. The textbox below
discusses how different government process types can affect Lean results.
Lean in Government Starter Kit | Page 12
-------
GOVERNMENT PROCESS TYPES AND IMPLICATIONS FOR LEAN RESULTS
Government processes can vary both by frequency and variation. Process frequency refers to how often a
process is executed. Process variation refers to the degree of change or difference among outcomes or products
produced by a process. These attributes can have important implications for the types of results—time, quality,
and cost—that can be achieved and should be expected from Lean implementation. For example:
High frequency-low variation processes. Lean
results can be particularly compelling for high
frequency-low variation processes, particularly in
terms of time and cost savings. The benefits from
Lean improvements accrue each time a high
frequency process is executed. For example,
Lean improvements to a travel authorization/travel
voucher process or a procurement/purchase card
process can save time and money every time the
process is executed. When these processes are
exercised thousands of times per year, benefits
add up quickly. Low variation processes are often
less complex, making is easier to use Lean tools
to drive out non-value added activity. Think about
opportunities for building momentum with Lean
success on high frequency, low variation
processes.
High Frequency
Low Variation
Travel vouchers
Procurement requests
Small source permitting
Low Frequency
Low Variation
Mission contract bid
Annual budgeting
quency
riation
quency
riation
• Low frequency-high variation processes. It can take
longer to realize impressive Lean results with low frequency-high variation processes. These processes are
typically more complex and do not occur as often as high frequency processes. While the initial time and
cost savings can be less dramatic than for high frequency-low variation processes, Lean methods can be
highly effective for improving the quality and effectiveness of low frequency-high variation processes. For
example, applying Lean to a periodic strategic plan development process or a rulemaking process can
produce meaningful time and cost savings, but the real value may lie in improvements to the quality,
effectiveness, and transparency of these processes. Value stream mapping and other Lean methods are
powerful tools for reducing the complexity of high variation processes. Lean also creates more robust
institutional memory of the process that avoids reinventing the wheel in the future.
Another Dimension that Can Affect Lean Results: Multi-Agency Processes
Processes that involve hand-offs among multiple government agencies or offices pose unique challenges and
opportunities. Each agency has its own internal process that interfaces with other agencies' processes. These
agency-specific processes may not be well-aligned and process "ownership" boundaries may not be clear. Value
stream mapping can be a powerful tool for building cross-agency understanding, trust, and alignment. Kaizen
improvement events can help improve internal agency processes that interface with the multi-agency process.
Leadership and political will across the participating agencies is typically needed to navigate obstacles arising
from differences in agencies' missions, goals, and organizational cultures.
Think carefully about which processes types you want to target first and set realistic expectations for results.
Lean in Government Starter Kit | Page 13
-------
All Lean events are led by a Lean facilitator who organizes and manages the discussions. Most
agencies have sought outside technical assistance for their initial Lean implementation efforts;
even agencies that have developed in-house capacity for lean training and facilitation
occasionally seek additional assistance, especially for larger or more complex projects. There
are a range of technical assistance providers that facilitate Lean events, including private
consultants, non-profit National Institute of Standards and Technology (NIST) Manufacturing
Extension Partnership (MEP) centers, and university-based training programs.2 Private sector
companies who are using Lean have also provided technical support to agencies by allowing
agency staff to attend industry trainings and providing Lean facilitators for agency events.
When evaluating a potential Lean facilitator, it is important to consider the facilitator's past
experience, areas of expertise (e.g., supporting Lean in government and office settings), price,
and availability. In general, the cost of an experienced Lean facilitator ranges from
approximately $2,000 to $3,400 per day. The cost of having an experienced facilitator is
typically well worth it to ensure a successful Lean event. The next chapter provides additional
guidance on how to select a Lean facilitator.
2 A directory of NIST MEP centers is available at: www.mep.nist.gov/about-mep/center-info.html.
Lean in Government Starter Kit | Page 14
-------
This chapter assumes that your agency has chosen a Lean project focus and outlines the three
main phases for conducting a successful Lean event: event planning, event implementation, and
event follow-up. A Lean event is a highly structured, two to five day facilitated event involving
a team of agency staff and stakeholders that is designed to rapidly make progress in identifying
and implementing improvements to a process.
STARTER KIT RESOURCES SUPPORT KAIZEN AND OTHER LEAN EVENTS
While most guidance and resources in this Starter Kit were developed to support kaizen events, the information
and resources are also useful for planning and implementing other types of Lean events, including value stream
mapping (VSM) events and 5S events.
Lean Event Planning
Once you have decided to conduct a Lean event, effective planning and scoping are essential for
success. There are three major phases of activity prior to conducting a successful Lean event.
These phases are outlined below, along with key activities associated with each phase. It is
important to note that some activities in each phase should occur concurrently, rather than in
sequence. For example, it may be necessary to address some logistics, such as setting event
dates or securing a conference room, well in advance of the pre-event meeting.
PHASES IN PLANNING FOR A LEAN EVENT
Phase 1: Initial Planning and Scoping
>=> Secure a Lean facilitator
^> Scope the event
^> Identify the Lean method to use
>=> Identify the Lean event sponsor and team leader
Phase 2: Pre-event Meeting
>=> Refine the event scope and objectives
>=> Set clear boundaries for the event
>=> Identify performance metrics and pre-work needed
^> Select participants and determine roles
Phase 3: Event Preparation and Logistics
^> Prepare the event agenda
>=> Arrange logistics
>=> Collect needed data and information
>=> Communicate about the event
Lean in Government Starter Kit | Page 15
-------
•', i I mini ..I ! II ..i in nil I-? ..H": •'.
The importance of securing an experienced Lean facilitator cannot be overstated. The Lean
facilitator serves as a team's guide throughout the Lean process, helping to scope the Lean event,
facilitate the event, and advise on follow-up activities. Sometimes the Lean facilitator is referred
to by the Japanese term sensei (SEN-SAY), meaning teacher or "one who has gone before."
While it is possible to cultivate experienced Lean facilitators within an organization, most
organizations seek the external consulting services of a Lean facilitator, at least for the first few
years of Lean implementation. It should be noted, however, that even experienced Lean
organizations retain outside senseis to bring fresh perspectives to their Lean implementation
efforts, help facilitate larger or more complex events, and push them to make more progress than
they otherwise would.
Several helpful tips for securing a Lean facilitator
include:
• Talk with representatives from other
government agencies to ask for • Event Preparation Checklist |
recommendations for potential Lean . Lean Facilitator Request for I
facilitators. Proposal I
• Consider issuing a request for proposal to help
with the selection of an experienced Lean
facilitator. The sample Lean Facilitator Request for Proposal resource document in this
Starter Kit should give you some ideas of the types of information to request.
• When evaluating potential Lean facilitators, take into consideration the facilitator's past
experience, areas of expertise (e.g., supporting Lean in government and office settings),
references, price, and availability.
• Remember that securing a talented facilitator is not the same as getting a talented
facilitator who has experience running Lean events.
Additional roles that you will want to identify for a Lean event are defined in the following table.
These common Lean roles and responsibilities are described in more detail further in this chapter
and in Chapter 4.
Lean in Government Starter Kit | Page 16
-------
LEAN
Lean Facilitator The Lean facilitator runs the pre-event meeting, the Lean event, and certain follow-up
meetings (e.g., 30-day follow-up meeting). The Lean facilitator has training and experience
in Lean facilitation.
Sponsor The sponsor provides resources and senior leadership support for the Lean event and has
the authority to remove obstacles to implementation of the new process. This person should
be a senior leader of the division within which the Lean event is taking place.
Team Leader The team leader is responsible for helping to plan the event, including the logistics, and
assisting the facilitator during the event.
Implementation The implementation manager is responsible for ensuring that a clear and effective event
Manager follow-up process is established and conducted. This person should have sufficient authority
to lead follow-up activities, remove barriers, and drive accountability.
the
Early on in the planning process, it is important to answer three key questions:
• What is the purpose of the event?
• What value stream or process will be targeted in the Lean event?
• What are the desired outcomes?
The answers to these questions will guide initial planning activities, such as making sure the
right people participate in the pre-event meeting (Phase 2). During the pre-event meeting, the
scope, goals, objectives, and boundaries for the event will be further refined and documented.
Making sure the scale and scope of the Lean project is manageable and will allow for a
successful event is crucial. In particular, managers should consider the breadth and complexity
of the process and be realistic about how much of the process can be tackled in four or five days.
the to
Once the initial scope of the event has been
determined, consider which Lean methods to use. As
discussed in Chapter 2, there are a variety of methods
to choose from for your event. Two common Lean
methods are value stream mapping and kaizen events.
Six Sigma is also used by some agencies to drive
improvement projects, but organizations are
increasingly viewing Six Sigma as a powerful
collection of statistical analysis tools and methods that can be used during or in conjunction with
a kaizen event. Your Lean facilitator can guide you in choosing the methods that are right for
your agency and process.
Pre-Screening Application for
Value Stream Mapping Events
Lean in Government Starter Kit | Page 17
-------
Agencies just starting out with Lean often use kaizen events to quickly achieve the results that
have interested many in Lean. Conducting one or a few kaizen events can help build momentum
for a Lean initiative. Some agencies choose value stream mapping (or simplified process
mapping) for their first event, since this method can help an agency clearly understand its
process and identify areas of waste that can be targeted through future kaizen events. Other
agencies have integrated value stream mapping and kaizen rapid implementation techniques in
the same event.
the and
Sponsor
Identifying a Lean event sponsor is critical to success. Ideally, the sponsor is a director or leader
of a division within which the Lean event is taking place. Having a sponsor for an event can also
increase buy-in within the agency and among upper management, and assist with removing any
obstacles in getting the event planned and implemented. This role is especially useful when
trying to ensure that team members can get two to five days worth of time away from their
regular duties and responsibilities to participate in the event. The sponsor participates at key
times during the event and helps with follow up.
The sponsor should be enthusiastic, committed to the process, willing to take risks, and be open-
minded and communicate this spirit to the team members. At times it can be difficult to sustain
creative thinking and risk taking. The sponsor's role is to help infuse the team with energy and
direction, and to encourage openness to out-of-the-box thinking. Specific responsibilities of the
Lean event sponsor include:
• Provide the necessary financial resources for the event.
• At the event kick off, communicate expectations to the team and set the direction of the
Lean event.
• Clearly state that the process that the Lean team develops during the event will be the
new process—the team is not making recommendations.
• State that the sponsor will do everything possible to support the new process developed
by the team.
• Challenge the team to develop innovative solutions and ideas without introducing pre-
conceived ideas.
• Be visible during the event and provide enthusiastic support of the participants.
• Attend team leader meetings and daily management briefings and provide redirection if
needed.
• Assist in removing obstacles.
• Be strategic: use the event to advance agency objectives by improving the performance of
the targeted process while being aware of the impact to the total system.
• Attend the report-out session for the event to show support and congratulate team
members on a job well done.
Lean in Government Starter Kit | Page 18
-------
• Track the status of implementation efforts following the event to make sure the team
continues to make progress and does not
backtrack.
A Lean event sponsor contract can be used to affirm a
sponsor's responsibilities and to demonstrate his or
her commitment of support. . Lean Event Sponsor Contract
Team
The team leader is usually determined after the initial event focus and scope have been decided.
The team leader assists the Lean event facilitator in setting the stage for a productive event.
There are differing opinions on whether the team leader should work in the area of the event's
focus. On one hand, an outsider can sometimes help the team navigate entrenched perspectives,
creating a more open and transparent environment for team members to be creative. On the
other hand, it can be useful to have a well-respected individual from the work area that can help
drive and sustain commitment to improvements made by the team through assistance with
follow-up activities. Think about what makes most sense for your organization. It is common
for the team leader to have participated previously in one or more Lean events. Often the team
leader helps coordinate event logistics, including securing the event space, arranging for meals,
and purchasing supplies. Ideally, the team leader has an assistant who can help support them
with administrative tasks that need to be accomplished prior to and during a Lean event.
Specific roles and expectations of the team leader include:
• Support the team members in finding solutions.
• Help facilitate an open exchange of ideas.
• Encourage creative thinking and problem-solving.
• Support the team during event implementation.
• Ensure that all event objectives are met.
• Help prepare for the event.
• Assist in selecting team members.
• Prepare the schedule and agenda.
• Gather needed materials and tools.
• Keep up to date on all aspects of the event.
• Assist with documentation and reporting.
• Secure external consulting services of Lean facilitators.
• Arrange a site visit for the Lean team to talk with the workers and see the process in
action.
When the team leader is from outside the specific content area in which the event is occurring,
good communication is crucial. Team leaders will need to know the goals and objectives of the
event, any process requirements, and the expectations of the team members. Any contextual
Lean in Government Starter Kit | Page 19
-------
information, such as past problems encountered and gains achieved should be shared with the
team leader.
Ptw.'- 1:: I
The pre-event meeting occurs between three and six 7: M'i ~^. ^^,
weeks prior to the Lean event. It is probably the most . , , • • i ! ! ! ! ! ! ! 1 •' • . •"•'•.•' ;| !;" .-,:• H!! 111111111111
crucial step in planning and preparing for a successful : <\ H[[[ I
Lean event. The pre-event meeting is commonly held
in the venue in which the Lean event training will • Pre-event Meeting Agenda I
take place. The pre-event meeting should involve the _ _. . I
Lean facilitator, the event sponsor, the team leader, * |
and key managers and staff who oversee or are • Example Team Charter j
involved in the process to be targeted by the Lean '
event. Pre-event meetings typically last between two
and four hours, depending on the complexity of the process and event and the Lean experience of
the participants. The following topics should be addressed and finalized during the pre-event
meeting:
• Refine the event scope and objectives
• Set clear boundaries for the event and establish ground rules.
• Identify performance metrics and pre-work.
• Select participants and determine roles.
Document decisions made at the pre-event meeting in a team charter. The team charter sets out
the scope of the process that will be addressed in the event, establishes the goals and objectives
of the event, identifies any work that must be completed prior to the event, and identifies the
team members.
the
The sample team charter referenced above includes examples of how the event scope and key
goals and objectives can be clearly and concisely documented. Key tips from Lean practitioners
include:
• Once a production process, administrative process, or area is selected, choose the specific
"waste elimination" problem within that area to focus the Lean event. Consider which
metrics you'll use to measure the results from the event (see the metrics section below).It
is important to select an event scale (breadth and complexity) that can be accomplished
within the timeframe allotted for the event.
• Ask your Lean event facilitator for help with appropriately scoping a Lean event.
Additionally, talk with other environmental agencies that have targeted similar processes
using Lean. Staff at these agencies may be able to offer suggestions for scoping and
planning your Lean event.
-------
Set Ground for the
L,/\t
Setting ground rules for the event helps ensure that
all participants respect and hear all ideas and .. . ,, ,
. . 5 j j • ..u ^ r- j • Keep an open mind to change
viewpoints expressed during the event. Ground
rules also remind participants to keep an open mind
and to "think outside of the box." Ground rules are
reviewed during the kick-off meeting and are
prominently posted for all participants to see. _, L.
r i j i • i j j • .u j- 4. • Practice mutual respect everyday
Example ground rules are included in the adjacent r ' '
resources box.
Set for the
_ . , ...... . , - There is no such thing as a dumb question
During the event scoping discussions, it is crucial
Maintain a positive attitude
Never leave in silent disagreement
Create a blameless environment
Treat others as you want to be treated
One person-one voice, regardless of
position or rank
that the event sponsor, possibly in coordination with
other key agency managers, set clear boundaries for the Lean event. Setting boundaries in
advance helps enable a Lean team to keep its focus on those aspects of the process and potential
solutions it has reasonable control over. It is important that the scope for the event include areas
to which the Lean team is empowered to make changes and decisions. There are two key types
of boundaries:
• Process-scope boundaries. It is important to clearly identify where the process starts and
ends, at least insofar as which parts of the process will be discussed during the Lean
event. It may also be necessary to draw clear lines where hand-offs are made to other
processes. For example, it may be appropriate for a state Lean event to set an external
review process (e.g., EPA review, public comment process) as a part of the broader value
stream or process that is "out of bounds" during the Lean event.
• Solution-scope boundaries. It may also be important to set limits on the types of changes
that are allowed as part of the Lean event. For example, it is typically appropriate to say
that policy changes are off-limits.
Establishing clear boundary conditions for the Lean event can address potential concerns that
some agency staffer stakeholders may have while also clarifying team expectations about
aspects that are fair game for improvement. Key examples include:
• Clear boundary conditions ensure that agency objectives—such as environmental
protection and public participation—are not undermined. For example, changes that
would require rulemaking action are generally considered out of bounds during a Lean
event, although these ideas could be held in a "parking lot" for future consideration.
• Boundary conditions can be helpful in addressing key stakeholder concerns up front. For
example, when conducting a Lean event on a permitting process it may be necessary to
clearly state that public comment and participation opportunities will not be lessened, or
that the time for substantive analysis and review by permit engineers will not be lessened.
• Boundary conditions can help set clear expectations about the availability of resources.
Lean events are designed to strongly encourage creativity to find ways to reduce costs
rather than to increase capital expenditures.
Lean in Government Starter Kit | Page 21
-------
EXAMPLE BOUNDARY CONDITIONS FOR A STATE AIR PERMITTING EVENTS
In Scope
• Interpretation of agency rules, policies, and
guidance documents
• Internal organizational structure
• Internal permit process and timing
• Applicant interaction and timing
• Electronic submittals
• Application content and format
• Permit and technical memo format
• Special condition content
• Communication (internal/external)
Out of Scope
• EPA regulations
• Interpretation of EPA rules, policies, and guidance
documents
• Modifying existing agency rules
• Additional resources
• Permit appeal process
• Mandated public participation requirements
• Permit involving enforcement action
• Public hearing process/officer
While it is okay to allow teams to set some boundary conditions during the event, it is important
to identify which boundary conditions must be set in advance.
Identify Pre-Work and Metrics
Pre-work and collecting data on baseline metrics are important for effectively using your time in
a Lean event. Collecting data on the current state of a process enables a Lean team to understand
the process, to identify areas for improvement, and to assess the effectiveness of potential
changes to the process. Often, pulling together information at the sub-process level can help
inform the team's understanding of the current state of the targeted process. It is not enough to
know the overall process performance, it is also necessary to understand how things work at the
process step level. In addition, there may be other materials to assemble before the event and
other tasks that need to be completed ahead of time, such as getting approvals for making certain
types of changes during the event.
Pre-work
In many cases, it may be helpful to assign responsibility for "pre-work," the tasks that need to be
completed before the Lean event. Pre-work can include collecting data prior to the event that is
needed to establish baseline metrics and gathering background documents that are likely to be
useful during the Lean event, such as existing process maps, procedures, or examples of process
outputs (e.g., recurring reports). Although Lean events usually include some time to collect
baseline data, it can be quite valuable to gather these data in advance, if possible, so that the
Lean event team can spend more time working on solutions to eliminate waste in the process.
Sometimes it can also be helpful to have information on how key "customers" or stakeholders
perceive the targeted process and its outputs. Getting a sense of the "customer's voice" prior to
the Lean event can be helpful, particularly if key customer groups will not be represented on the
' Example "In Scope, Out of Scope" list based on a presentation of the Delaware DNREC.
Lean in Government Starter Kit | Page 22
-------
Lean event team. It may take some time to get customer input, through interviews or surveys, so
plan for and collect this information in advance of the Lean event.
Metrics
Current state metrics establish the baseline by which to measure the outcome of a Lean event.
Metrics should be quantified before, during, and after Lean events. The Lean Government
Metrics Guide (see resource) provides definitions and examples of metrics often used in Lean
government efforts. There are several categories of metrics for evaluating improvements to
specific processes, as follows.
• Time metrics. What is the total lead time for the process (e.g., start-to-finish time for a
permit application review)? What percentage of that time adds value from the customer's
perspective? How long does it take to complete a cycle or transaction within the process?
What percent of products (e.g., permits and travel authorizations) are delivered on time?
• Cost metrics. How much does the process cost to operate (e.g., the number of full time
equivalent employees)? What cost savings did the team identify in the Lean event?
• Quality metrics. How often does the process lead to mistakes (e.g., incomplete or
inaccurate forms) that require rework? How do customers view the effectiveness and
efficiency of the process?
• Output metrics. How many products (e.g.,
permits) are completed or processed each
month or year? What backlogs exist in the
process?
- Process complexity metrics. lto» many * Pre-event Data Collection Guide
steps are in the process? How many of • Lean Government Metrics Guide
those steps add value, from the customer's
perspective? How many times is a
document handed off between individuals, offices, or departments in the process?
LE'-j" .:.OVEi":NMENT FixXE. .
Time Metrics Cost Metrics Quality Metrics
<=> Lead Time >=> Labor Savings >=> Customer Satisfaction
O Best and Worst Completion >=> Cost Savings >=> Rework
Time i=> Cost per Product >=> Percent Complete and
O Percent On-Time Delivery Accurate
<=> Processing Time >=> Rolling First Pass Yield
O Activity Ratio
<=> Value Added Time
O Non-Value Added Time
<=> Non-Value Added but
Necessary Time
<=> Percent Value Added Time
Lean in Government Starter Kit | Page 23
-------
Output Metrics Process Complexity Metrics
<=> Production >=> Process Steps
O Backlog >=> Value Added Process Steps
<=> Work in Process >=> Decisions
O Inventory >=> Delays
O Handoffs
0 Loops
O Black Holes
ultimate goal of using Lean and Six Sigma in environmental agencies is to improve
• environmental outcomes more efficiently and effectively. The metrics listed in this Starter Kit
: provide a number of ways to track and evaluate the efficiency of government processes and the
: operational benefits from process improvement efforts; however, making the connection
; between process efficiency improvements and environmental outcomes is more challenging.
; Measuring the contributions of specific Lean events or Six Sigma projects to environmental
; outcomes—such as drinking water quality, human exposure to air pollutants, changes in
; greenhouse gas emissions, and habitat condition—is difficult, given the variety of variables
'• that influence environmental outcomes. In most cases, administrative processes targeted by
• Lean (e.g., a permitting process or grant distribution process) are removed from having direct
• impacts on environmental outcomes. Occasionally, the process targeted by a Lean event can
have a more direct impact on environmental outcomes. In such cases, the project team should
consider whether it is appropriate to set a baseline environmental outcome measure and
evaluate the changes to the measure as a result of the improvements made to the process.
; Consider asking the question: "How does the targeted process affect environmental outcomes?"
In addition to measuring the results of individual Lean events, environmental agencies may also
want to track the progress and results of Lean implementation at an organizational level. Types
of metrics relevant in this context include the following.
• Lean deployment metrics. How many Lean events have we completed this year? How
many employees have participated in at least one Lean event? How many employees
have participated in Lean training classes or certification programs?
• Morale metrics. How satisfied are employees with the agency or office? What is the staff
turnover rate and how does it compare to the average for government agencies?
Lean in Government Starter Kit | Page 24
-------
FOR LEAN
Lean Deployment Metrics \ Morale Metrics
O Lean Events Conducted I O Employee Satisfaction
<=> Lean Event Participation | >=> Turnover
<=> Lean Training I
Consider these points when identifying key metrics:
• Determine the purpose of the metrics. Measuring the wrong things can waste people's
time or, in the worst cases, reinforce undesirable behaviors. In selecting metrics,
consider questions such as:
o What is the purpose of the metric? What wastes are we trying to eliminate? What
behaviors are we trying to reinforce?
o Who are the key audiences for the metric?
o How will we use the measurement data?
• Just use a few metrics. No more than a few metrics per category are needed. Having too
many metrics dilutes the focus of the improvement efforts and can create unnecessary
work.
• Use only the appropriate metrics. Ask whether there is something important about a
targeted process related to each category of process metrics, and do not worry if the
answer is "no." Also consider which metrics would be useful to evaluate across the
agency, depending on the status and goals of the Lean or Six Sigma initiative.
• Focus on customers and agency leadership needs. While many metrics can show
improvements made during Lean events (e.g., reductions in the number of process steps),
only a few metrics matter to customers, including the time it takes to receive a service or
product (lead time) and the quality of the service or product. Make sure to include some
metrics that reflect key interests of customers, along with metrics that will resonate with
agency leaders and support the agency's strategic goals.
• Engage data users in the design of the metrics. It is important to engage people who are
familiar with the process in the design of metrics and the development of a system for
collecting and reporting performance data. Without consulting front-line employees,
agencies risk choosing metrics that are poorly understood, irrelevant, or inconsistently
used by the people who do the work.
and
Thoughtful participant selection can ensure a successful and productive event, making it
important to carefully select external stakeholders and agency staff participants. Team members
are expected to attend the entire event and fully participate by providing input and ideas. Team
members are also expected to complete assignments identified during the meeting or tasks that
may be defined after the event. Here are some things to consider when selecting participants and
determining roles:
Lean in Government Starter Kit | Page 25
-------
Ensure the team has cross-functional
representation. The "thirds rule" provides a
good guide for structuring the Lean team
composition (see textbox). It is important that
members of the team are empowered to make
commitments about process improvement
ideas that are within the scope of the event.
It is often helpful to have a representative ' 1/3 of P**f*«B who manage or
,, , , • r. -11 supervise the process
from the agency s information technology . .„ , .. . . , . ,. .,
. , , • 1/3 of participants who are not directly
group, since most processes have some r r '
important relationship to agency databases or
information systems. It may also be useful to
The "thirds rule" provides a guide for
structuring the Lean Team. Include:
• 1/3 of participants who work directly in
the process
involved in the process (e.g., people
from the agency, external stakeholders,
customers)
consider whether people from the agency who
are indirectly affected by the process or
representatives from other support functions, such as accounting, legal, or human
resources would be helpful to involve.
Participant selection can help secure buy-in from all levels of an agency for the process
improvement efforts. Most importantly, you should include staff and managers on the
team that can continue implementation beyond the event itself. Consider involving
informal as well as formal leaders on your Lean event team.
Lean event teams are typically comprised of 12-18 members. However, some processes
are extremely complex and it may take additional participants to get all the right players
at the table. If additional participants are required, the largest size recommended is 20.
Once the group size gets beyond the mid-twenties, it can become very challenging to
manage, especially for the facilitator.
If you cannot pare down your list of critical participants for an event below 20, another
option to consider is to convene off-site meetings on specific topics, such as holding a
meeting that deals exclusively with a specific aspect of the process that some participants
may care most about, such as legal review. This approach is suggested for highly
complex processes or issues.
One strategy for getting more people into the room during a Lean event is to distinguish
between observers and participants. Observers should be limited in number and should
not outnumber team members as too many observers may cause team members to be
uncomfortable or hesitant to express their viewpoints. While observers are welcome, it is
critical to communicate that they are observers only.
Team members are expected to shed all of their operational responsibilities during the
course of the event, thereby allowing them to completely focus on the event. It is highly
disruptive and disrespectful to the team if a senior manager is routinely taking calls,
checking email, or leaving the room for other meetings. Ensure that each team member's
responsibilities are delegated to other staff during the event and communicate the
expectation that team members should not be doing other work during the event.
If you are having trouble selecting team members, it may be useful to hold a pre-event
meeting with a small group of staff to identify all the activities included in the event
Lean in Government Starter Kit | Page 26
-------
scope and which staff members are connected to these activities. In addition, the Lean
facilitator can provide advice on how to select participants (e.g., qualities/characteristics
to look for).
' .y ' -..:;,
the
Prior to the Lean event, prepare an event agenda that
clearly articulates the objectives and timing for the ;
event. An effective agenda ensures that the objectives
and goals of the event match the given timeframe.
The Lean facilitator is typically responsible for
preparing the agenda, or at least reviewing it prior to • Kaizen Event Agenda
sharing it with participants. It is important to
distribute the agenda to participants before the event.
All events require a certain amount of logistical planning, such as selecting a date, reserving
meeting space, re-distributing staff workloads, and securing meals during the event. Addressing
these logistical questions before the event helps to ensure smooth implementation and create a
comfortable, stress-free environment for participants.
• Schedule the event. The typical duration for a
kaizen or value stream mapping event is 3-5
days. Thus, it is important to consider these \
timeframes when scheduling a Lean event, as
holidays or staff vacations could interfere with , |_ean Event Supplies List
event timing. If you have opted to hire a Lean , _ . , ... «.,,..
facilitator, keep the same scheduling | * Lean Event Log.st.cs Checklist
considerations in mind.
• Reserve sufficient meeting space. During
some Lean events, participants may need to break out into smaller groups for part of the
event, so it is important to ensure that there is space and materials available for breakout
sessions and the group as a whole. Furthermore, it may be helpful to reserve additional
space for the initial training session and/or final report-out presentation.
• Finalize logistics and schedules. Logistical preparations such as setting aside space for
the Lean event team or meal orders and the finalization of the agenda should be
addressed or completed prior to the event.
• Send reminder e-mail. It is helpful to send a reminder e-mail or calendar invitation to
ensure that team members have the correct dates and times blocked on their calendars.
Lean in Government Starter Kit | Page 27
-------
Prior to the event, collect background materials and data about the current state of the process,
based on the performance metrics and pre-work identified during the pre-event meeting.
the
Communicating proactively is critical to building organizational buy-in to process improvement
efforts. Transparent communications, particularly with employees whose work may be affected
by the Lean event is vital to ensuring success.
• Schedule a briefing with senior management once the scope and objectives of the Lean
event has been set. Top management support is crucial for a successful Lean event, in
part because it can affect budget and staff availability. It is also important for senior
management to approve many of the aspects of a Lean event, including:
o The process that will be addressed;
o The decision to hire an external Lean facilitator;
o The anticipated timeframe, products, and results; and
o How the event will affect staff availability and workload.
• Inform staff about the Lean event. Notifying
internal staff that a Lean event will occur
provides transparency to the process and is a
great opportunity to solicit feedback and ideas
on event scope or "areas of pain" in the . Frequently Asked Questions
targeted process. Communications with staff About Lean
should include information on the Lean event
as well as background information on Lean
methods and how the Lean event could affect staff. It may be helpful to directly address
potential concerns that some employees may have about Lean or the focus of a particular
event. For example, it may be helpful to clearly indicate that no staff will lose their jobs
as a result of improvements made from the Lean effort. The "Frequently Asked
Questions about Lean" resource contains information that is often helpful to
communicate to others in the organization.
Lean in Government Starter Kit | Page 28
-------
Lean Event Implementation
This section addresses key activities and steps involved in conducting a successful Lean event,
including the following:
LEAN EVENT IMPLEMENTATION STEPS
^> Lean Event Overview
^> Kick off a Lean Event
>=> Manage the Phases of a Lean Event
^> Manage Change During a Lean Event
^> Identify Follow-Up Action Items from the Event
^> Report Out at the End of the Event
^> Celebrate a Successful Event
Lean Event Overview
The diagrams below lay out the main phases of a kaizen event and VSM event. Kaizen and
VSM events often take place over a 5-day period. They can be shorter, however, if the scope of
the process being addressed is more limited. Some organizations conduct one-day "point
kaizen" events that focus on a very specific area for improvement. Most events follow the steps
outlined below. Lean leaders highly discourage efforts to short cut the kaizen or VSM process,
since much of the power of Lean lies in following the methods closely.
Kaizen Event Overview
Davl
Training Day
Lean training;
begin mapping
and measuring
current work
process
Dav2
Discovery Day
Measure and
analyze current
work process
Dav3
Do Day
Create and map
new process
Dav4
Do, Re-Do,
Document Day
Evaluate
improvements,
operate using new
process, finalize
DavS
Celebration
Day
Present results
and celebrate
Some Lean facilitators describe the flow of a kaizen event as (!) measure, (2) analyze, (3)
improve, (4) control, and (5) report and celebrate. While the terminology may vary slightly, the
steps and flow of a kaizen event tends to vary little whether it is being applied to a manufacturing
workshop or an office administrative environment.
Lean in Government Starter Kit | Page 29
-------
,; [/• jnt
One of the main differences between a VSM event and a kaizen event is that a VSM event
typically focuses at a higher level, mapping the entire chain of processes that create and deliver
something of value to a customer. While the general structure of a VSM event is similar to that
of a kaizen event, the VSM event is typically designed to develop a roadmap to guide future
kaizen events that target specific areas where improvement is needed. VSM events emphasize
planning and prioritization of future activities, while kaizen events focus on implementing
process changes.
Day 1
Training Day
Training on
VSM tools and
how to draw a
VSM map
Day 2
Current State
Draw a map of
the current state
and identify
problems
Day 3
Future State
Map the shared
vision of the
new process
Day 4
Planning
Evaluate how to
implement the
future state map and
create a plan
Day 5
Celebration
Day
Present results
and celebrate
In addition to the event agenda prepared prior to the
Lean event (see section under Phase 1 above), it is
also important to prepare a team leader daily agenda.
This detailed agenda is essential for identifying the
team leader's responsibilities and actions throughout
the event. This agenda also ensures that the flow
between the main phases of a Lean event is smooth
and that all activities are well executed.
• Team Leader Daily Agenda
Planning for the kick-off of your Lean event is essential for success. The kick-off session is
typically introduced by the Lean event sponsor and the Lean team leader, and then handed off to
the Lean facilitator. The kick-off session should include the following activities.
• Introduce all team members and observers. Ask each team member to briefly address a
few key questions:
(1) Who are you and where do you work?
(2) What are your goals for this event?
(3) What do you like to do when you are not at work?
• Capture team members' goals on aflipchart and post them on the wall. By
understanding participants' goals, it is often possible to create improvements in a form
and manner that meet diverse needs.
Lean in Government Starter Kit | Page 30
-------
Have the event sponsor say some opening words. This can be helpful to clearly articulate
the event scope and boundaries, while encouraging (or even inspiring) team members to
work towards the desired outcomes and event goals.
Review ground rules for the event. It is important to review the ground rules that were
established during the pre-event meeting and post them prominently for all participants to
see.
Briefly review key performance data and background materials that have been
assembled. This can help anchor the team around desired outcomes and key reasons for
working creatively to improve the process.
Set a tone for having fun! Team engagement is key to success. Make the event fun for
everyone, including staff and support personnel. If the event facilitator and team leader
are fully engaged and show enthusiasm, it will be contagious.
Lean training is typically a core part of the first day of a Lean event. For many people this may
be their first event and it is important that all participants be on the same page about how the
Lean event will work. Think of this as just-in-time training—where participants learn about
Lean immediately prior to implementation. Most organizations continue to have training as part
of the kick-off for every Lean event, even if most or all team members have previously
participated in a Lean event. Most organizations find that the just-in-time training provides
invaluable reminders, gets everyone on the same page, and serves as an icebreaker to get the
team warmed up for several days of intensive activity. Training is also discussed in Chapter 4.
While much of the success of a Lean event rests on careful planning and preparation, managing
the event phases is also a significant responsibility. During the Lean event it is easy for the
process and participants to get off track. While your Lean facilitator will help keep discussions
on track, it is important for the team leader to maintain the focus on the event's objectives. A
few tips include:
• Develop and adjust the agenda daily and post it in a high traffic area for all participants
to see. The agenda should be accessible to all participants as a reminder of the day's
events.
• Ensure that the team members understand Lean terms conceptually and in practice. One
of the underlying goals of an event is to identify waste or non-value added activity in a
process. While some terminology can sound negative, waste in Lean terminology refers
to anything that adds cost or time without adding value from the perspective of the
customer.
• Promote and encourage creative problem-solving. It is critical to the success of Lean
that the event fosters creative thinking. The facilitator and team leader must work to
create space in which all team members feel safe to bring up ideas, even if the ideas seem
non-conventional.
Lean in Government Starter Kit | Page 31
-------
• End each day at a reasonable hour. Working late into the evening is not necessary and
can hurt team morale. If the work is complete, don't hesitate to end early. If longer
hours are needed, all participants must agree to this schedule.
• Assign homework during the event to track
actions and the work completed. Homework
often includes ideas that participants did not
have the time or resources to complete and can
be used to track actions for event follow-up
(see the "Lean Event Homework" form * Lean Event Homework
included as a resource).
A few method-specific tips include:
• When doing process mapping in a Lean event, don't assume that the process works as it
is intended to work. Develop the current state map based on actual data and observations
about how the process works in practice, even if that makes the map messy.
• Techniques for helping people get to the root cause of an issue or problem. When people
are stuck on something there are a variety of techniques that a team leader with some
Lean facilitation experience can use.
o One approach is the 5 Whys method. The approach of asking "why" five times is
used to identify the root causes of problems in a process or value stream. By
applying the 5 Whys method an agency can identify waste and improvement
opportunities. You may find that there no longer are good reasons why a process is
implemented a certain way.
o Another common technique is Cause-and-Effect (aka fishbone) Diagram: This is a
useful technique that is used to trigger ideas and promote a balanced approach in
group brainstorming sessions where individuals list the causes and effects of
problems.
'M • • o .- ".•" '" '?nt
Real change is difficult. There are often a thousand reasons to maintain the status quo. Yet it is
vital to trust the insights and ideas that emerge during the Lean event. Lean methods are
specifically designed to help people see processes in a new light, making it painfully clear where
improvement is needed and opening paths for change that were not previously evident.
Diverse emotions are often stirred when individuals involved in the targeted process watch the
Lean team rip into the work they do on a daily basis and highlight large amounts of non-value
added activity. Be sensitive to this, remembering that the focus is on the process, not on the
performance or accomplishments of individuals. The team goal is to forge a process that
increases all participants' ability to add value and to perform meaningful work. Note that these
emotions can be magnified for those who are involved in the targeted process but who may not
be participating on the Lean team.
Lean in Government Starter Kit | Page 32
-------
Give some thought to how to best reach out during and after the Lean event to others whose jobs
may be directly affected by changes made during the event.
A few tips include:
• Brainstorm new ways to eliminate waste and/or to re-conceptualize a process or an
entire value stream. Stay innovative. Don't be limited by what has been tried before.
• Be flexible and willing to try new things. Keep testing new ideas during kaizen events
but avoid the paralysis of over-analysis. Create value stream maps using sticky notes on
white boards or butcher paper, so that they can be easily adjusted during the event.
Expect to revisit and revise "future state" implementation plans.
• Test improvement ideas as much as possible in an event before changing the layout or
order of a process. Afterwards, implement the new plan. Lean encourages testing new
improvement ideas and utilizing creative thinking. In VSM events, it is common to
develop several iterations of your future process map before settling on one that the team
agrees on.
• Communicate with management. Immediate supervisors should to be kept informed
about changes to the process. One way to do this is to hold a 15—20 minute daily
briefing for the event sponsor and other key managers and supervisors each afternoon of
the event. These brief meetings can help ensure management buy-in and tap help in
removing any obstacles the team may be facing.
• Hold trainings for staff about process changes and future plans. Explain to workers not
involved in the event how the new process will make their jobs easier and more
rewarding. Let them know how to get involved in future process improvement efforts.
Fo'iow-yp the
While conducting your Lean event, you may discover other areas or processes that would benefit
from Lean. While common, it is important to maintain the group's concentration on the focus of
the current Lean event. For tracking purposes, make note of these opportunity areas for future
projects. On the final day of the event document action items your team was not able to
complete in the event, assign responsibilities and due dates for individual tasks, and select one
person to serve as an overall implementation manager to track follow-up efforts.
' ;'.. >,' 'Ut It tf'-T : "ir1- ;:•'" OH
Participants give a report-out presentation at the end j j'T|
of the Lean event. The event sponsor and other senior '
managers who did not participate in the Lean event
often attend the report-out presentation. The report-
out serves as a forum for exchanging ideas and * Report-Out Summary
informing others of the team's accomplishments. It • Event Report-Out Presentation
also helps to solidify the shared experience during the % Event Eva|uatjon Form
event.
Lean in Government Starter Kit | Page 33
-------
Generally, the presentation includes an overview of the event objectives, activities, and results.
A few tips include:
• Assign individual team members with presenting part of the presentation. It is helpful to
involve all team members if possible.
• Conduct a "dry run" presentation so team members are comfortable with their roles.
• Focus on the highlights of participants' experience rather than presenting a verbatim
recap of the entire event.
• Keep the presentation to less than 45 minutes, leaving approximately 10 minutes for
questions and comments by the audience.
• Hand-out an event evaluation form prior to the presentation. This allows participants to
share their experiences confidentially and can be used to identify possible process
candidates for future Lean events.
a
Upon completing the Lean event, it is important to celebrate the achievements and hard work of
the event. An event celebration is a great way to extend thanks to participants, planners, and
managers, and to recognize the team's contributions.
• Coordinate with the event sponsor or staff support to plan the celebration.
• Consider providing each team member with a certificate or a small token of appreciation
to commemorate the event.
• Take a team photo and make copies for all team members.
• Consider sharing the results of the event through an agency newsletter, a posting on a
bulletin board, or in a press release. (See additional ideas in the next section).
• Give credit to support personnel, other staff in the area, and the team members for
making the gains possible.
Now that you have completed your Lean event, effective follow-up is vital to realizing and
sustaining the benefits.
Track and Implement Event Follow-up Actions
Document the New Process and Communicate Internally
Evaluate Performance
Communicate Externally
Lean in Government Starter Kit | Page 34
-------
and
Follow-up is necessary to reap the full benefit of your Lean event. One of the most important
products of a value stream mapping event is the "future state" implementation plan, yet that only
delivers value to the extent it results in future process improvements. In addition, while kaizen
events encourage implementation of many process changes during the event, there is often a list
of follow-up actions that the team was not able to make during the event. Effective follow-up is
also vital to sustaining the team-based culture that is often created during Lean events.
Action items should be clearly documented and tracked carefully to ensure completion by target
dates. Prompt follow-through on incomplete actions is vital to overcome inertia that can cause an
organization to revert to the old process. Move forward with implementation on the Monday
following your Lean event.
Implementation
One of the most essential steps to ensure effective follow-up is to identify an "implementation
manager." The implementation manager (could also be called the "process champion," among
other titles) is responsible for ensuring that a clear and effective event follow-up process is
established and conducted. Specific responsibilities of the implementation manager include:
• Schedule and run event follow-up |
meetings; |
• Lead efforts to identify and remove |
obstacles to effective follow-up; |
• Hold the team accountable for follow- |
through on actions; |
• Ensure that progress is periodically |
evaluated and corrective actions are |
implemented, as needed; and |
• Ensure that post-event communication |
plans are executed. |
Monitoring follow-up requires a lot of effort.
This effort can get lost if it is not an assigned
part of an individual's day-to-day work.
Coordinating follow-up solely by email has
pitfalls, as it is easy for people to ignore,
neglect, or misinterpret email messages.
If the implementation manager is off site
and/or does not work directly within the
implementation team, it is harder to play a
motivational role on follow-up activities.
Carefully select the implementation manager. This role can be filled by the Lean event team
leader or another qualified person in the agency. The individual should have sufficient stature,
authority, and connection to the process to lead follow-up activities, remove barriers, and drive
accountability. The individual must also be able to make sufficient time available to ensure
follow-up activities happen. It can be helpful to select an implementation manager who is
somewhat familiar with Lean and who is co-located with other team members.
Lean in Government Starter Kit | Page 35
-------
Tracking Follow-Up Actions
Another important step is to establish an
effective system to document and track
follow-up actions to ensure their completion.
In particular, make sure there is a person
responsible (an "owner") and a deadline
associated with each action item.
When tracking actions and results, keep in
mind the following tips:
• Stretch, but be realistic. While it is important to keep pressure on to quickly address Lean
event follow-up actions, try to set the team up for success. Discuss potential obstacles
that could derail efforts to complete actions within the first 30 days and brainstorm ways
("countermeasures") to navigate around these obstacles.
EXAMPLE AGENDA FOR WEEKLY
MEETINGS
• Review progress in addressing action items
• Identify obstacles to follow-up
• Agree on a plan to address the obstacles
• Update action item list as needed
Resources
Lean Event Follow-Up Action
Tracking Form
Track follow-up actions in a centralized place.
Consider using the Lean event follow-up
action tracking template provided in the Starter
Kit. Someone on the team should be tasked
with keeping track of the status of follow-up
actions. Post follow-up action lists in a shared
place onsite. If some team members are
offsite, an online collaboration website may be
a useful place to track actions and post relevant post-event resources and information.
Using color codes on an action list can make it easier to quickly assess follow-up status,
particularly when there are numerous open actions.
Color Coded Signals on Action Item Tracking List
Green = On track
Yellow = Needs attention to keep on track
Red = Off track; needs urgent attention
Conduct daily or weekly implementation check-in meetings with the core members of the
Lean team. Set up brief daily or weekly meetings with a small implementation team
comprised of team members with event follow-up responsibilities. In some cases, the
check-in meetings can be piggybacked on another project or staff meeting, if the
appropriate team members are present. The meetings can be quick (e.g., 5-15 minutes)
and even held standing up—some organizations try to make these check-ins have a
distinct feeling and energy that differentiates them from conventional meetings. The tone
of these check-in meetings should be one of team-based problem solving. If an
individual's follow-up actions are not getting completed, have the team explore ways to
free the individual's time or consider alternatives for getting the actions completed.
Lean in Government Starter Kit | Page 36
-------
The weekly check-in meetings should take place until all follow-up actions have been
completed. If possible, hold these meetings where the work is actually performed to
provide an opportunity for the implementation team to talk with workers, see the process
in action, and hear firsthand what is going well and where there are obstacles. See the
textbox above for an example weekly check-in agenda.
While it may sound like an unnecessary hassle, holding a 5-15 minute daily or weekly
stand-up team check-in meeting can do a lot to both ensure effective event follow-up and
to sustain a sense of teamwork. These quick check-ins can play a major role in
reinforcing a collaborative, team-centered organizational culture.
Walk the process. Implementation managers and other team members should
periodically walk around the office, following the flow of the process work and checking
in with staff involved in the process. Too often, managers do not leave their offices.
Checking in with staff involved in the process sends a message that their work, and the
changes made and planned through the Lean event, are important and valued. These
interactions can also provide real-time feedback on process performance and follow-up
action status, allowing for quick troubleshooting where needed.
Conduct monthly report-out meetings. Most organizations conduct 30-, 60-, and 90-day
report-out meetings to supplement the weekly check-in meetings. Six- and 12-month
report-out meetings are also important to ensure that improvement results are sustained
and to identify the need and scope for potential Lean events in the future.
These meetings are typically more formal than the weekly check-ins and provide an
opportunity to measure process performance and drive ongoing improvement (see the
section below on "Evaluating Performance" for more discussion of the monthly report-
out meetings). The focus of weekly meetings described above is more tactical—to ensure
that event follow-up actions are being completed. In the monthly report-out meetings,
the Lean team can think more strategically about the new process and evaluate the
process performance using key metrics identified during the event.
It is best if the full Lean event team, including consultant support, members from outside
the process, and management sponsors, can attend (in-person or via teleconference) the
monthly report-outs. These meetings give team members a chance to see the results of
their labor, assist with identifying and removing obstacles to improvement, and
strenghten their ownership of the improved process. Many agencies endeavor to make
these meetings fun, which helps keep enthusiasm high among all particpants.
The new work process resulting from a Lean event needs to be clearly documented and
communicated to all involved in the process. Transparency is vital to ensuring that changes are
understood and executed. When documenting the new process, keep in mind the following tips:
• Prepare and post a clear map of the new process. A concise, visual map of the new
process can be a powerful tool for communicating key steps and elements of the process.
Think creatively about where to post the map to ensure that it is seen by those who have a
Lean in Government Starter Kit | Page 37
-------
role in the process. For example, process maps can be displayed on bulletin boards or
white boards in hallways or conference rooms, and/or on a web page on the agency's
intranet. Placemat-sized maps can even be developed (with color and graphics) and
laminated for hanging in employees' work stations.
• Develop "standard work" procedures. Standard work procedures are highly-effective
Lean tools for ensuring that a new process is implemented in a clear and consistent
manner. Standard work procedures should be clear and concise and use consistent
formatting. They should be prominently displayed where the work is actually performed;
procedures that sit in binders on shelves typically do little to influence behavior.
Involving employees who perform the process step to assist with developing the standard
work documentation can both increase ownership and capture valuable knowledge.
Standard work documentation can help ensure expectations are clear regarding desired
work approaches under the new process. Standard work can also help an agency prevent
backsliding when staffing transitions occur.
• Boldly express management support for the new process. Managers can play a key role
in event follow-up by expressing unambiguous support for the new process developed
during the Lean event. Managers can also allay employee concerns. For example, some
employees may fear that development of "standard work" procedures and a more
transparent process may affect their job security or eliminate room for employee
creativity within the process. Managers can make it clear that the goal is to free
employees to have the time and space to add more value to the process and other
activities for which they have responsibility.
In addition to documenting and communicating about the new process, it is important to consider
implementing other communication activities that can generate momentum for success.
• Send thank-you letters to all internal and external participants.
• Present event results at a department or division meeting or retreat.
• Post results on bulletin boards or "exhibit areas" in the agency lobby or common spaces.
• Acknowledge Lean event results or activity at a staff meeting or an agency awards
ceremony.
• Write an article in your agency's internal newsletter that outlines your Lean
implementation experience.
• Post information and photos of the Lean event, as well as follow-up information, on the
agency's intranet/internet.
Regularly evaluating performance and analyzing
results is a critical component of Lean. Lean's
continual improvement focus means that the Lean
event marks the beginning of improvement efforts.
Continue to monitor the performance of the process . Lean Govemment Metrjcs Gujde
over time, and be on the lookout for countermeasures
Lean in Government Starter Kit | Page 38
-------
needed to address problems as well as additional process improvement opportunities. It is
important to both evaluate performance based on the key metrics identified during the pre-event
meeting and to track the extent to which the event achieved the goals and objectives set for the
event. For more information on metrics, see the Lean Event Planning section in Chapter 3 or the
Lean Government Metrics Guide resource available on EPA's Lean Government website.
Keep the following tips in mind when evaluating post-event process performance:
• Discuss process performance at the monthly report-out meetings. A key focus of the 30,
60, and 90 day report-out meetings is to assess the post-event performance of the process
and to make adjustments to sustain or improve results. Consider using the questions in
the box below as a guide for these meetings.
KEY TO
Are all employees following the process as designed in the event (or as modified since the event)?
Is there evidence that all employees, including those new to the area, have been trained on the new
process?
Is process performance being measured and reported as set forth in the kaizen event?
Is the implementation manager monitoring and supporting compliance to the new process?
Is the appropriate leadership informed of and engaged in the process?
Are consequences for not following the new process design in place?
Have any unintended consequences (positive or negative) arisen? Check with downstream customers.
Are workers pleased with the improvements? Do they feel their work has been simplified?
Use the event objectives as targets for monitoring the performance of the process.
Referring back to the team charter and other early documents can help ground the results.
It also may be useful to identify milestones that represent interim steps to reaching the
final performance objectives.
Consider using visual displays or dashboards to show progress towards the performance
objectives and to motivate additional improvement efforts. Visual displays can be
powerful communication and motivational tools. It is important to keep them simple, so
that they are easy to understand and do not become a time-consuming task to create and
update. Many organizations use a whiteboard or color-coded wall chart to track how the
process is performing. If updated for the weekly meetings, the chart can serve as a focal
point and motivational tool.
Consider adjusting key performance metrics to ensure that you have a clear dashboard to
monitor the future performance of the process. For example, in value stream mapping
events, you should rely on the initial metrics identified in the current state map and future
state maps as indicators of success. These metrics should be reported on at 30, 60, and 90
day events. Having a few good measures can help identify potential backsliding and spur
action to sustain momentum for improvement. This information can also help identify
appropriate timing for a follow-up Lean event, if warranted.
Lean in Government Starter Kit | Page 39
-------
Making process description and performance information available to key stakeholders and the
public can be a powerful means for improving transparency and participation in government
processes. External communications can also be important to ensure that external parties
involved in or affected by a process are sufficiently aware of changes made. It may be useful to
solicit feedback from affected parties to ensure that process improvements are having their
intended effects.
Consider developing an external communication plan related to the Lean event. A
communication plan can help ensure that your agency proactively publicizes the improvements
and addresses any potential stakeholder concerns that may arise around process changes.
Potential communication activities include:
• Reach out to your customers and key stakeholders to identify any changes to the process
that affect their involvement.
• Write an article for your agency' s website or public newsletter that outlines your Lean
implementation activities.
• Conduct a webinar to brief key stakeholders and interested members of the public on
process changes and improvement results.
• Post information on your Lean events, including results, on your agency's website.
Consider including the following types of information in communication materials:
• Brief description of the process and the problem (What was not working well?)
• Basic information on the event (What? When? Who?)
• Key results related to time, cost, quality, and other outcomes
• Key differences between the old process and the new process (What has changed or will
change? What types of improvements were made?)
• Brief statements on the significance of the improvements
• Outline of future improvement plans
Follow-up is an integral component of a successful Lean event. It is hard work and requires a lot
of effort, but is key to maintaining the momentum of fast-paced improvement inspired during the
Lean event. In addition, conscientious follow-up activities help people to develop a continuous
improvement mindset.
The next chapter describes how to sustain and diffuse Lean within a government agency.
Lean in Government Starter Kit | Page 40
-------
Doing one (or a few) Lean events at a government agency can be an eye-opening and exciting
experience. Observing rapid and dramatic improvements in an agency process can offer a
glimpse into what is possible to accomplish—even in a large government bureaucracy. Yet
running a few successful Lean events may not sustain the benefits. It is important to remember
that sustaining and diffusing Lean into an agency is a critical part of the overall Lean work.
After the first few Lean events, inevitable questions arise:
How can we sustain and diffuse the successes of our initial Lean activity?
What does Lean mean for our agency for the long term?
Responses to these questions can range significantly, from "we are done with Lean" to "let each
part of the agency pursue use of Lean on its own" to "we are going to incorporate Lean into how
our agency does its business." Each agency must decide whether it sees sufficient value to
continue using Lean. If the agency decides to continue with Lean, then it must decide how.
There is no right answer to this question, but failure to strategically consider it can be disastrous.
At best, failure to think strategically about sustaining and diffusing Lean activity will increase
the cost of capacity building, Lean training and facilitation, and Lean tool development. Far
worse, one or two poorly planned and executed Lean events can sour the agency on Lean and
undo past progress. Furthermore, given the frequency of changes in agency leadership,
initiatives that are not well-planned or entrenched in the agency can be vulnerable to elimination.
This chapter is designed to help you think strategically about how your agency can sustain and
diffuse Lean continual improvement activity. The topics covered in this chapter include:
• Sustaining Lean Improvements
• Understanding the Lean Journey
• Getting Started with Lean Diffusion
• Four Deployment Models for Lean Diffusion
• Future Directions—Building a Lean Continual Improvement Agency
While Lean methods can be used for one-time, one-shot improvement efforts, the real value of
Lean lies in its focus on continual improvement. Follow-up from Lean events is critical to
sustaining success and preventing back-sliding in process execution and performance. Three
activities are vital for sustaining Lean improvements: champion event follow-up, revisit
processes with future Lean events, and cultivate employee ownership of process improvement.
Lean in Government Starter Kit | Page 41
-------
Champion Event Follow-up
The event follow-up activities discussed in Chapter 3 directly prevent back-sliding by focusing
attention on completing open action items and addressing challenges that may have arisen after
the Lean event. Someone with sufficient authority must champion the event follow-up, help
remove obstacles, and hold team members accountable for closing out action items. Chapter 3
discusses this important role for an "implementation manager" or "process champion." The brief
weekly check-in meetings, coupled with 30-, 60-, and 90-day report-out meetings, are essential
investments to ensure that the results from Lean events are sustained and enhanced.
Revisit Processes with Future Lean Events
Lean is not a one-time event. First, follow-up is essential to ensure that the new process takes
hold, runs smoothly, and achieves the desired results. Second, significant improvements can
result from conducting periodic improvement events on the same process every one to five years
or more frequently. World-class Lean organizations are often amazed at the magnitude of
process improvement results that can be achieved when processes are targeted multiple times
over a few years. Fresh thinking and perspectives often unleash time, quality, and cost
improvement ideas that could not have been imagined during the first Lean event. Third, other
Lean methods, such as 5S and visual controls, focus on sustaining Lean improvements by
keeping workspaces well organized and making potential problems visible so they can be
quickly addressed.
Cultivate Employee Ownership of Process Improvement
Empower employees involved in a process to become active stewards of the process. By
actively engaging those involved in a process to "own" its activities and performance, it is
possible to identify and address improvement opportunities "on the fly." Managers should
routinely ask employees for their improvement ideas and process "malfunctions" should be
examined for lessons and improvement options. Another way to get fresh ideas is to give
employees the opportunity to exchange roles for a few hours and learn how different parts of a
process work. The new vantage points can help team members see the process—and
improvement opportunities—in a new light. Consider developing formal or informal systems for
collecting improvement suggestions from employees (such as idea boards) and make sure to
recognize employees for their suggestions and initiatives.
Understanding the Lean Journey
Achieving the desired Lean approach to expand Lean activity, a deployment model, does not
happen overnight. Lean organizations often describe their efforts as a "journey," consisting of
various phases of Lean activity and culture change. The figure below describes three key stages
that typically occur as an organization matures in its use of Lean: improving, optimizing and
transforming.
Lean in Government Starter Kit | Page 42
-------
o> • Continuous improvement is everyone's job
•p • Improvement is driven by strategy and
J5 Scoreboard
IS • Lean is "the way we work"
j5 • Result: value delivered to taxpayers and
l~~ customers
Management team leads process improvement
Opportunity-focused clusters
Managers applying the Lean methodology
Result: better strategy execution and expertise
established
en * Lean teams drive deployment
•p • Ad hoc projects focused on financial benefits
P • Learning the Lean and Six Sigma tools
C" • Result: identify and eliminate waste and
•" process variation
Three to Five Years to a Lean Culture
The road is not always smooth and many organizations implementing Lean experience a greater
chance of failure between 6 and 18 months into their Lean journey. This often occurs due to a
lack of strategic focus to the Lean activities, a lack of management passion and commitment to
successful Lean implementation, and a lack of staff time and money devoted to support the
journey. During this period, initial excitement and momentum from the first few Lean events
can subside, especially without active leadership or a clear plan for continuing and diffusing
Lean activity.
It is common for organizations to conduct one or more Lean events that are not viewed as a
success. The text box below lists several factors that can lead to a Lean event being viewed as
unsuccessful. It is important to remember that such "failures" do not mean that Lean cannot
work in your agency. Leader organizations use these "failures" as teaching moments. Diagnose
the event and make a follow-up plan that directly addresses the key factors that undermined past
success.
Lean in Government Starter Kit | Page 43
-------
WHY DO SOME LEAN EVENTS "FAIL"
Unclear Scope: Event scale or scope was too large—it was too much to address in a 4-5 day event. The
size and complexity of the process really needed a value stream mapping event followed by a series of
kaizen improvement events.
Lack of Visible Management Commitment. Unless managers visibly commit to and actively support the
improvements and process changes, it is easy to backslide to business as usual.
Poor Event Facilitation or Support. Failure to adequately prepare for a Lean event limits what can be
accomplished; similarly, lack of a skilled facilitator can inhibit progress during a Lean event.
Inadequate Follow-up: Insufficient attention, resources, and accountability can prevent the new process from
being successfully implemented in a reasonable timeframe.
Strategic Misalignment. When multiple autonomous departments or agencies are involved in an event,
conflicts can emerge due to differences in mission and strategic direction. This misalignment can undermine
management support for follow-up and implementation activities.
Unrealistic Expectations: Expectations for what the event could achieve were not realistic given the process
type, complexity, or other factors.
Getting Started with Lean Diffusion
While a hands-off, grassroots approach to Lean may be appealing in some agencies, some cross-
agency coordination and planning is invaluable for effective Lean implementation. Lean leaders
in the public and private sectors have found strategic ways to expand Lean activity at a lower
cost and with better consistency and results. There are six important steps for diffusing Lean
within an agency.
Lean Diffusion Steps
1. Implement Lean in several areas and share results
2. Send clear and consistent supportive messages from agency leadership
3. Establish an agency Lean coordinator
4. Build a core Lean team and expand staff capacity through cross-training
5. Develop a consistent approach and tools for implementing Lean
6. Keep at Lean to sustain momentum, but do not push too hard too fast
1. Implement Lean in Several Areas and Share Results
The best way to sustain and expand Lean activity is to achieve results and to share them
throughout the agency. Identify several departments or programs in the larger agency that may
be good places to conduct Lean events and to build staff experience with Lean. Conducting
single events throughout an agency can yield good improvement results and expose many
Lean in Government Starter Kit | Page 44
-------
personnel to Lean, but this approach will not necessarily build centers of Lean experience that
are sufficient to sustain organizational interest and attention and to champion Lean activity.
After your first Lean event, consider these four factors when selecting areas for Lean activity:
• One or more processes in the area have significant improvement needs and/or
opportunities for impressive results
• Managers and/or key personnel in the area are highly receptive to using Lean
• Managers and/or key personnel in the area are well respected throughout the agency and
could become an effective champion and/or advocate for Lean within the agency
• Personnel in the area have previous experience using Lean methods
After completing Lean events, share the results and let them speak for themselves. Chapter 3
includes information on measuring and communicating Lean results. Prepare a brief, attractive
presentation that shares key information on Lean events conducted throughout the agency.
Involve key personnel from other departments and divisions in Lean events to help introduce key
personnel and "idea leaders" within the agency to Lean.
2. Send Clear and Consistent Supportive Messages from Agency
Leadership
Strong support from agency leaders is critical to both effective implementation and diffusion of
Lean. Without the personal and visible support of senior managers, the effectiveness of Lean
events can be undermined. Effective Lean implementation requires sustained attention and
resources, along with an openness to change. Visible leadership commitment and support are
also vital to encourage other parts of an organization to step forward and try Lean. Leadership
commitment is crucial to ensuring that the agency will back and support the work of Lean
practitioners, both during specific Lean events and in broader organizational deployment of
Lean. Several actions that Lean leaders must take are outlined in the box below.
KEY ACTIONS FOR LEAN LEADERS
Create a clear and compelling case for change.
• Communicate continually with internal and external constituents
• Address employees' questions about "what's in it for me?"
• Define success - and celebrate when it occurs
Build the infrastructure for change.
• Align employee rewards and compensation to support process improvement efforts
• Clear obstacles to change and improvement as they arise
• Identify and nurture leaders who emerge during Lean implementation
Establish metrics and reinforce accountability.
• Expect follow-through and track open actions
• Encourage the use of visual management approaches to share results
Lean in Government Starter Kit | Page 45
-------
Visible leadership is also critical to help many managers who are new to Lean overcome the
perceived risk of trying a new and unfamiliar process improvement method.
TO LEAN
S We've already tried that.
^ We're too busy to take time out for an improvement event.
S We don't have time to focus on process improvement.
^ It will cost too much to do a Lean improvement event.
S It will never work in our area or department.
^ Nothing's broken, so why fix it.
S We're not like a manufacturing company; those concepts and tools don't apply to us.
Most organizations that embark on a Lean journey soon discover that the excuses for not trying
Lean are unfounded and that the payback from Lean implementation can be quick and dramatic.
(Also see the textbox, "Isn't Lean Just the Latest "Flavor of the Month"?" on page 10.)
3. art
Once your agency has committed to implementing multiple Lean events, it is critical to identify
an agency Lean coordinator to help guide and keep track of Lean activity throughout the agency.
An agency Lean coordinator can help prevent unnecessary rework by linking those interested in
using Lean with potential consultants or event facilitators, training resources, and lessons learned
and other helpful information. Some government agencies have found it useful to task the Lean
coordinator with leading the development of an
organizational Lean deployment strategy. Such a y^f ^ ;j:^ ?^>.
strategy can support organization-wide Lean activity 1' : i; ' ,:! ; v
and ensure that it is connected to the organization's
overall mission, strategic plan and other priorities. An
agency Lean coordinator can also track the use of • Sample Lean Coordinator Job
Lean across other government agencies and look for Description
benchmarking and information sharing opportunities.
4. a
Begin to build Lean expertise in your organization by having a few employees participate in
multiple Lean events across your agency (or at other public agencies). The best way to learn
about Lean and become skilled as a Lean practitioner is by observing and participating in Lean
events. While training courses can be useful, they are no substitute for time spent in Lean
events, even if the events are focused on processes different than those an individual works on.
Many organizations report that assistance with Lean event facilitation and deployment from
experienced Lean consultants is essential until an organization has developed sufficient internal
capacity. Leverage consultant support for Lean events to advance broader capacity building and
Lean in Government Starter Kit | Page 46
-------
deployment goals. Over time, this can reduce dependence on Lean consultants for event
facilitation services, which can be costly. Many experienced Lean organizations retain some
level of strategic advising and support on Lean deployment from Lean consultants. Another
strategy that some organizations take is to hire Lean expertise by bringing in one or more
experienced Lean practitioners who have successfully led Lean events or deployment efforts on
administrative processes elsewhere in public or private sector organizations.
Invest in several employee team members who demonstrate interest and skills with Lean. Get
these team members to participate in as many Lean events as possible. Give them increasing
responsibility for leading Lean teams and facilitating Lean events (sometimes with consultant
help). While it may take 3-4 years of practice to independently lead Lean efforts, these team
members can assume significant responsibility for Lean implementation quite quickly, reducing
the need for consultant time. As discussed below, it may be useful to build a Lean training
program within your organization to speed capacity-building efforts and ensure the use of
consistent methods and tools.
5. Develop a Consistent Approach and Tools for Implementing Lean
As lean is diffused across the organization, avoid having each office or department reinvent
existing Lean tools or processes. This Starter Kit provides a variety of templates that can be
adapted to meet your agency's needs. Experienced Lean government practitioners report that
without a consistent organization-wide approach, it is difficult to replicate performance
improvements from one department to another. Many organizations have found that a consistent
approach to implementing Lean methods and tools can still accommodate sufficient flexibility to
meet the needs of diverse offices, programs, and processes.
Government organizations should consider employing a common approach for selecting and
contracting with a Lean facilitator. This can be an important way to ensure that each project or
event uses a common approach to Lean. Agencies also may find that a standardized approach
may reduce transaction costs associated with hiring and retaining Lean consultants. When an
organization is ready to build internal capacity for Lean facilitation through training and
certification, a single Lean training curriculum will enable internal Lean event facilitators to
implement Lean events throughout the agency.
6. Keep At It to Sustain Momentum, But Do Not Push Too Hard Too Fast
Successful Lean implementation requires a lot of hard work, but the results are often well worth
the effort. Consider holding at least three to four Lean events per year at your agency to sustain
interest and momentum. Many Lean leader organizations report that a good general rule of
thumb is to hold at least one kaizen event per month per 100 employees, once an organization
has matured on its Lean journey. While it is not uncommon for leading Lean organizations in
the public and private sector to run numerous Lean events each year, remember to pace yourself.
Moving too aggressively with Lean implementation when the agency is not ready can quickly
turn people off and make it seem like too much attention has shifted to Lean efforts, at the
expense of the agency's core mission.
Lean in Government Starter Kit | Page 47
-------
in I cm
Once an agency decides to expand its use of Lean, the challenge shifts to how to effectively and
efficiently proceed. There are four main models for deploying Lean in an organization,
including: Agency-Wide, Department/Division, Targeted, and Grass Roots .
Agency-Wide
Model
Of* PI
Characteristics:
•=> Top down driven
•=> Comprehensive
•=> Major culture change
•=> Rapid, highly visible
deployment
Deployment Considerations:
•=> Solid leadership from the top management is
essential
•=> Large infrastructure and full-time staff
•=> Significant planning and management
•=> Integration with other management systems
•=> Need for common language and problem-solving
methodology
•=> Need to address cross-agency processes
•=> 5+ years to achieve lasting culture change
Department/
Division Model
Targeted Model
Grass Roots Model
•=> Department leadership
but agency management
support
•=> Department pilot for
agency
•=> Comprehensive at the
department level
•=> Culture change
•=> Top management
leadership
•=> Focused on a few specific
agency problems
•=> Driven by a desire for
strategic impact
•=> Culture change is not a
deployment objective
•=> Originates at the bottom
of the agency
•=> Highly motivated
individuals lead the effort
•=> Project or problem
specific
•=> Culture change is not an
objective
•=> Easier to start due to smaller scale
•=> Slower pace is possible; scale up after initial
success
•=> Greater use of consultants and outside training
•=> Less integration with management systems
•=> Similar to agency-wide model but on a smaller scale
•=> Risk of not getting beyond the department level
•=> Easy to get started
•=> Can work in smaller agencies
•=> Quick results because problems are identified
ahead of time
•=> Infrastructure needs are small; use contracted
resources
•=> Risk of not sustaining the gains
•=> Relatively easy to do but difficult to sustain over
time
•=> Track record for sustainable improvement is not
good
•=> Very vulnerable to changes affecting staffing
•=> Few if any infrastructure needs
Lean in Government Starter Kit | Page 48
-------
Most world-class organizations in the public and private sectors have found that having a guiding
vision and clear goals is critical for effective change management. Long-term agency goals,
resources, and leadership commitment should drive which model is selected. Key goals to
consider include:
• Organizational culture and transformation
• Strategic improvement
• Problem-solving
• Cost reduction
• Image
When selecting a model for diffusion, careful thought should be given to three factors: desired
impact, implementation scale, and organizational readiness (see table below).
DIFFUSION MODEL SELECTION FACTORS
Desired Impact
Implementation Scale
Organizational Readiness
Factors
Business Transformation
• Agency-wide deployment
• Major culture change
Strategic Improvement
• Targeted deployment on critical
problems
• Projects necessary for success or
survival
Problem-solving
• Specific operational problems
• Incremental improvements in agency
performance
<=>
Entire agency
Department/division
Project/Section/Team
<=>
0
Culture
Past process experience
Management team
Stability
There is no one "right" Lean deployment model, although many Lean leader organizations voice
strong support for the agency-wide model. Regardless which model is selected, management
support and commitment is an essential ingredient for long term success. Select a deployment
model and adapt it to best fit your agency's situation.
Future Directions—Building a Lean Continual Improvement Agency
The experiences of world-class companies show us that Lean can be much more than a process
improvement tool to be used only when a process seems broken. There are many opportunities
for environmental agencies to implement Lean to improve existing programs and processes or to
efficiently create new ones.
Lean in Government Starter Kit | Page 49
-------
Develop New Programs, Regulations, and Initiatives Using Lean
While improving existing processes is important, environmental agencies can realize significant
value by designing new programs and processes to be efficient and effective from the start.
Methods such as Design for Lean Six Sigma and Production Preparation Process (3P) offer
powerful approaches and tools for designing new processes to be highly effective and efficient.
These methods can also be used to design or redesign products, processes, and programs. (See
Appendix A for a Bibliography of Lean Resources.)
Improve and Manage Agency Value Streams
Most world-class Lean organizations work to manage and improve key value streams—the full
chain of processes and activities that deliver value to customers or stakeholders. For an
environmental agency, this could be the services the agency provides to society and to key
constituents and working to optimize these flows of value. This may lead to more holistic
approaches to environmental management that go beyond the traditional air, water, and waste
silos. For example, a state or local environmental agency could look comprehensively at how it
delivers all environmental protection services (permitting for air, wastewater, and hazardous
waste impacts, as well as technical assistance with pollution prevention and sustainability
initiatives) to businesses seeking to locate in the state, rather than focusing on optimizing just air
permitting or another specific part of that value stream.
Lean approaches offer some useful lessons in how to effectively plan, organize, and manage
organizations to optimize their value streams. Such lessons may open up exciting possibilities
for environmental agencies.
Link Lean Improvement Events to Agency Mission and Strategy
World-class Lean organizations are increasingly linking their improvement activities to their
strategic planning and goal-setting processes. A powerful method known as "strategy
deployment" (also known as hoshin kanri, hoshin planning, and policy deployment) elegantly
links the strategic goals of an organization with a cascade of increasingly specific programs and
activities that support those goals. Strategy deployment typically has a one to five year focus
(updated annually), taking longer-term strategic planning goals and objectives and honing in on
what needs to be accomplished in the coming year. A3 is a powerful Lean method that
complements strategy deployment by clearly displaying the connections between an
organization's priorities and tactical Lean implementation efforts on a single piece of paper. (A3
refers to the paper size.)
The visual presentation of this highly interactive strategy deployment planning process using the
A3 method incorporates key performance measures and assigns specific responsibilities for
achieving the goals to individuals at all levels of the organization. This creates a powerful means
for connecting Lean initiatives with an organization's mission and strategy. The end result is a
living, dynamic strategic planning process that is intrinsically linked to the activities and
improvement efforts that are planned and executed in the organization.
Lean in Government Starter Kit | Page 50
-------
•w %#
While the Lean journey takes hard work and perseverance, the power of harnessing the hearts
and minds of employees for achieving excellence can be transformative. World-class Lean
organizations find that freeing employees to focus more time on value-added mission-critical
work dramatically improves performance outcomes, customer and stakeholder satisfaction, and
employee morale. The Lean journey can lead to satisfied constituents, empowered and engaged
employees, passionate leaders, and better environmental quality. Best wishes for a productive
and successful Lean effort.
Lean in Government Starter Kit | Page 51
-------
-------
Appendix A. Bibliography of Lean References
Lean Government Resources
Articles, Reports, and Presentations
U.S. Environmental Protection Agency and the Environmental Council of the States (ECOS).
Working Smart for Environmental Protection: Improving State Agency Processes with Lean
and Six Sigma, www.epa.gov/lean/primer.pdf.
—. "Working Smart for Environmental Protection: State Efforts to Improve Permitting
Processes Using Lean and Six Sigma." Presentations from the ECOS Annual Meeting on 27
August 2006 in Portland, Oregon, www.ecos.org/content/project/detail/2292. (Presentations
include an overview of the Working Smart for Environmental Protection primer and case
studies of agency process improvement efforts in Iowa, Delaware, Michigan, and Virginia.)
—. Lean in Air Permitting Guide: A Supplement to the Lean in Government Starter Kit.
http://www.epa.gov/lean/airpermitting/Lean-in-Air-Permitting-Guide.pdf.
Chew, Jian Chieh. "Eight Workable Strategies for Creating Lean Government." iSixSigma.com.
(Mar 22 2006). http://europe.isixsigma.com/library/content/c060322b.asp.
Maleyeff, John. Improving Service Delivery in Government with Lean and Six Sigma. Strategy
and Transformation Series, IBM Center for the Business of Government.
www.businessofgovernment.org/pdfs/MaleyeffReport.pdf
Stiles Associates, LLC. "Lean in Iowa State Government: An Interview with Teresa Hay
McMahon." Future State: The Journal of Competitive Lean Thinking. (July 2008).
http://www.leanexecs.com/digest/pdf/FutureState_Jul08.pdf.
Books
Association for Manufacturing Excellence. Lean Administration: Case Studies in Leadership
and Improvement. New York: Productivity Press, 2007.
George, Michael L. Lean Six Sigma for Service: How to Use Lean Speed & Six Sigma Quality to
Improve Services and Transactions. New York: McGraw-Hill, 2003.
Fabrizio, Tom and Don Tapping. SSfor the Office: Organizing the Workplace to Eliminate
Waste. New York: Productivity Press, 2006.
Flinchbaugh, Jamie and Andy Carlino. The Hitchhiker's Guide to Lean: Lessons from the Road.
Dearborn, MI: Society for Manufacturing Engineers, 2006.
Lean in Government Starter Kit | Page 53
-------
Keyte, Beau and Drew Locher. The Complete Lean Enterprise: Value Stream Mapping for
Administrative and Office Processes. New York: Productivity Press, 2004.
Martin, James William. Lean Six Sigma for the Office. Boca Raton: CRC Press, 2009.
Martin, Karen. Kaizen Event Planner: Achieving Rapid Improvement in Office, Service, and
Technical Environments. New York: Productivity Press, 2007.
Miller, Ken. We Don 'tMake Widgets: Overcoming the Barriers that Keep Government from
Radically Improving. Washington DC: Governing, 2006.
Productivity Press Development Team. Kaizen for the Shopfloor. Portland: Productivity Press,
2002.
Productivity Press Development Team. The Lean Office: Collected Practices and Cases. New
York: Productivity Press, 2005.
Productivity Press Development Team. Standard Work for the Shopfloor. New York:
Productivity Press, 2002.
Rajesh, Jugulum and Phillip Samuel. Design for Lean Six Sigma: A Holistic Approach to Design
and Innovation. Hoboken: John Wiley & Sons, Inc., 2008.
Richard, Graham. Performance is the Best Politics: How to Create High-Performance
Government Using Lean Six Sigma. Fort Wayne: FIPG Press, 2006.
Sharma, Anand and Gary Hourselt. The Antidote: How to Transform Your Business for the
Extreme Challenges of the 21st Century. Durham: Managing Times Press, 2006.
Tapping, Don. The Lean Office Pocket Guide XL: Tools for Elimination of Waste in
Administrative Areas! New York: MCS Media, 2006.
Tapping, Don and Tom Shuker. Value Stream Management for the Lean Office: Eight Steps to
Planning, Mapping, and Sustaining Lean Improvements in Administrative Areas. New York:
Productivity Press, 2003.
Thompson, Jim. Lean Production for the Office: Common Sense Ideas to Help Your Office
Continuously Improve. Toronto: Productive Publications, 2009.
Venegas, Carlos. Flow in the Office: Implementing and Sustaining Lean Improvements. New
York: Productivity Press, 2007.
Womack, James P. and Daniel T. Jones. Lean Solutions: How Companies and Customers Can
Create Value and Wealth Together. New York: Free Press, 2005.
Lean in Government Starter Kit | Page 54
-------
—. Lean Thinking: Banish Waste and Create Wealth in Your Corporation. New York: Simon &
Schuster, 1996.
Websites
Environmental Council of the States (ECOS), http://www.ecos.org/content/proj ect/detail/2292/.
(ECOS is an organization that supports strategic initiatives for state environmental agencies.)
U.S. Environmental Protection Agency, Lean and Environment website, www.epa.gov/lean.
(This is an EPA website providing resources and information on Lean and the environment
for the private and public sector. This website includes Lean Government tools, methods,
and resources as well as information on Lean initiatives at state environmental agencies,
EPA, and other federal agencies.)
State of Iowa, Office of Lean Enterprise website, http://Iean.iowa.gov. (This website provides
background information on Lean concepts and tools, a series of downloadable resources for
Lean events, and information about Iowa agency Lean efforts.)
State of Minnesota, Enterprise Lean website, http://www.lean.state.mn.us/. (This website
provides information on Lean tools, resources, training opportunities, and Minnesota agency
Lean efforts.)
Lean Enterprise Institute, www.lean.org. (LEI is a non-profit research and training organization
focused on value stream mapping and Lean principles. Check out LEI's "Lean Government"
forum at http://www.lean.org/FuseTalk/Forum/.)
National Institute of Standards and Technology, Manufacturing Extension Partnership,
www.mep.nist.gov. (NIST MEP centers are non-profit Lean technical assistance providers.)
Productivity Press, www.productivitypress.com. (Productivity Press is a private Lean publishing
company.)
Weblogs that discuss Lean government topics:
• Benchmarking & Evaluation weblog: www.bmkcop.com/
• Curious Cat Management Improvement: http://evop.blogspot.com/2005/ll/government-
lean-six-sigma.html
• Evolving Excellence: www.evolvingexcellence.com/blog/2007/04/lean_government.html
• Gemba Panta Rei: www.gembapantarei.com/lean government
• iSixSigma: http://blogs.isixsigma.com/archive/introduction_to_lean_government.html
• Training Within Industry: http://trainingwithinindustrv.blogspot.com/2009/01/obamas-
lean-government.html
Lean in Government Starter Kit | Page 55
-------
-------
This appendix includes practical tools and resources for (1) how to get started with Lean,
(2) how to implement and manage the phases of a Lean event, and (3) how to sustain and
diffuse Lean activity across an agency. A summary description of each resource is
below. The resources are organized according to the chapter and section in which the
Starter Kit references them. All of the resources are available for download from EPA 's
Lean and Environment website, www. epa. gov/lean.
Chapter 2: Tools and Resources for Getting Started with Lean
Lean Overview Presentation
Lean Inventory
Chapter 3 (A): Tools and Resources for Lean Event Planning
Event Preparation Checklist
Lean Facilitator Request for Proposal
Pre-Screening Application for Value Stream Mapping Events
Lean Event Sponsor Contract
Pre-event Meeting Agenda
Team Charter
Example Team Charter
Pre-event Data Collection Guide
Kaizen Event Agenda
Lean Event Supplies List
Lean Event Logistics Checklist
Frequently Asked Questions about Lean
Chapter 3 (B): Tools and Resources for Lean Event Implementation
Team Leader Daily Agenda
Lean Event Homework
Report-out Summary
Event Report-out Presentation
Event Evaluation Form
Chapter 3 (C): Tools and Resources for Event Follow-up
Lean Event Follow-up Action Tracking Form
Lean in Government Starter Kit Page 57
-------
Chapter 4: Tools and Resources for Sustaining and Diffusing Lean Activity
Agency Lean Coordinator Job Description
Lean Deployment Presentation
1. Lean Overview Presentation. This presentation introduces senior agency
management to Lean principles, methods, and key success criteria, and offers
example results from past agency improvement efforts.
2. Lean Inventory. This inventory summarizes Lean implementation efforts at state
environmental agencies. It can be used with managers and staff to provide context
for your agency's Lean initiative.
1. Event Preparation Checklist. This event preparation checklist provides a summary
of key actions needed across the phases of Lean event planning and implementation.
2. Lean Facilitator Request for Proposal. This sample request for proposal describes
potential qualifications to look for in a Lean facilitator and how to rank candidates.
3. Pre-Screening Application for Value Stream Mapping Events. Once an agency
has conducted its first Lean event, it is helpful to have a standard form for evaluating
and prioritizing potential future events. This application outlines questions for
agency managers and staff to answer about potential value stream mapping projects.
4. Lean Event Sponsor Contract. This contract is signed by the team sponsor and
team leader to ensure that the sponsor understands the event's focus and the critical
role that the sponsor plays.
5. Pre-event Meeting Agenda. This agenda includes a set of objectives and guiding
questions to discuss with the event team during the pre-event meeting.
6. Team Charter. This team charter allows an agency to articulate the scope, goals,
and objectives of the event, along with follow-up dates to ensure that the process will
move forward after the event.
7. Example Team Charter. This is an example of a completed team charter.
8. Pre-event Data Collection Guide. This guide outlines critical steps and questions
associated with gathering baseline or "current state " data before a Lean event.
9. Kaizen Event Agenda. This kaizen event agenda provides an example of time
allocation over a five-day kaizen event. The agenda is a high-level guide and can be
easily modified to be more event-specific.
10. Lean Event Supplies List. This supplies list includes materials frequently used at
Lean events. To help ensure smooth event functioning, come prepared with the right
supplies on hand.
Lean in Government Starter Kit Page 58
-------
11. Lean Event Logistics Checklist. This checklist provides a chronological guide for
making food and logistical arrangements for a Lean event. While food and logistics
preparation may seem like minor issues, they ensure that an event junctions smoothly
and allow participants to focus on the process.
12. Frequently Asked Questions about Lean. This sample Question and Answer
document answers many of the key questions that get raised about Lean events. The
document can be distributed to agency staff prior to an event.
1. Team Leader Daily Agenda. This detailed agenda outlines specific roles and
responsibilities of a team leader over a five-day Lean event.
2. Lean Event Homework. This homework sheet is a useful way to track action items
and assignments identified during a Lean event.
3. Report-Out Summary. The event report-out summary is a one-page "snapshot" of
the event results. The summary includes the event scope, objectives, goals, a tabular
representation of improvements, and a list of actions implemented.
4. Event Report-Out Presentation. This presentation provides an example of the type
of information shared in a Lean event report-out presentation.
5. Event Evaluation Form. This form is used to evaluate and solicit feedback from
event participants. It is important to listen to participant's perspectives since their
responses can inform the success of future events.
1. Lean Event Follow-up Action Tracking Form. This tracking sheet is a useful way
to track action items assigned during the event report-out. The sheet identifies who is
responsible for completing an action item and when the item is due.
1. Agency Lean Coordinator Job Description. This job description outlines the roles
and responsibilities of an agency Lean coordinator; it can be used by agencies
interested in expanding their Lean efforts.
2. Lean Deployment Presentation. This presentation outlines several options as well
as key considerations for broader agency Lean deployment.
Lean in Government Starter Kit Page 59
-------
Event Preparation Checklist
a Scope of event
a High level process steps
a Data available (time, quantity, frequency)
a Budget (cost center)
a Potential internal and external team members
a Identify support staff (refer to support staff role)
a Identify communication staff (prints team certificate, communicates with other
employees)
a Identify staff with Microsoft Visio software (installed on laptop)
a Reserve room for pre-event, event, and report-out presentation
a Reserve laptop, projector and speakers
a Send invitation/email to team members about pre-event and event date, time, and
location
a Setup room
a Setup projector and laptop (for Lean overview)
a Setup 1 easel stand and pad, provide easel markers
a Develop scope, goals, and objectives for event
a Identify pre-work
a Finalize team member selection
a Identify sub-team leader
a Finalize team members meal selection
a Order meals, snacks and drinks
a Order supplies (refer to supplies List)
a Print/order training manuals
a Prepare folder and nametag (include training manual, agenda, scope, goals, and
objective)
a Invite management to daily report (e.g., Tuesday and Wednesday from 4:00 to
4:30 p.m.)
a Invite interested parties and employees to report-out (e.g., Friday from 10:00 to
11:00 a.m.)
a Arrange a site visit for the Lean team to talk with the workers and see the process
in action during the event.
Lean in Government Starter Kit Page 60
-------
a Setup room and layout folders and nametags
a Setup projector, laptop and speakers
a Setup 2 easel stands and pads, provide easel markers
a Event supplies available in the room
a Provide meals, snacks, and drinks
a Take team picture on Tuesday morning (for team certificate)
a Setup room with 2-3 computer/laptop on Wednesday and Thursday (connected to
network for accessing files if possible)
a Print and distribute team certificate on Friday
a Communicate with other staff via website or email on progress of team
a Email team member report-out presentation and other relevant files to event
participants
a Fill out travel payment form
a Send thank-you letters to team members
a Setup 30-day follow-up date, time, and location
a Develop communication plan (e.g. update website with event results, inform
stakeholder groups)
Lean in Government Starter Kit Page 61
-------
Lean Facilitator Request for Proposal
Please describe in detail how you will meet each requirement. The successful Vendor
will work the [insert Agency name] (the Agency) to facilitate the expansion of lean
process improvement methodology in executive branch agencies. Such services shall
include, but are not limited to, the following:
A. Lead department Kaizen events, Design for Lean Six Sigma events, value stream
mapping events, conduct 5S training and audits, and consult with the Agency on other
relevant Lean tools and methodologies. While serving as the lead consultant, the
service provider will also coach and mentor state employees, serving in the capacity
of team lead, to build the Agency's capacity to successfully lead Lean events.
B. Meet with Agency leadership to identify potential Lean projects. Conduct pre-work
events that result in the identification of project scope, objectives, goals and data
compilation. The consultant will also guide the Agency in team member selection for
participation in Lean events.
C. Provide follow-up services, on an as needed basis, to ensure sustainability of Lean
process improvement efforts.
D. Work with department leadership to implement policy deployment so that Agency
improvement efforts are linked to strategic goals.
If a Vendor's proposal does not meet the required services, the proposal will be rejected.
3.2 QUALIFICATIONS AND INFORMATION
Vendors should offer detailed answers to the questions in this section.
A. Please describe your experience facilitating and consulting on Lean in a public
sector organization.
B. Please describe the methodology used to implement Lean in an organization.
Please outline basic methodology as well as tools.
C. Please describe in detail any additional services that you believe would assist
the Agency in this project. The benefit that is provided to the Agency should
be specifically addressed.
3.5 VENDOR INFORMATION
The following information is required of prospective Vendors and will be used to
evaluate their qualifications:
Lean in Government Starter Kit Page 62
-------
A. Name of Vendor
B. Form of business entity (e.g. corporation, partnership, etc.).
C. State of incorporation (if a corporation).
D. Home office address and telephone number.
E. List of branch locations.
F. Provide a description of your background, organizational history, size and
years in business.
G. Specialized services, if any, and years of experience in each such area.
H. Minimum of three (3) business references from companies or government
agencies that use services within the scope of this RFP.
4.4 SELECTION PROCESS
B. Evaluation criteria and assigned point values:
• Credentials and Qualifications 35points
• Demonstration of vendor's qualifications and expertise
• Number of years experience in providing service sought
by RFP
• Level of experience providing types of services sought
in RFP in a public sector organization
• List of services similar to those sought by RFP that vendor
has provided to other organizations.
• Proposal Meets Mandatory Requirements 35 points
• References 10 points
• Completeness and Organization of Bid 10 points
• Costs 10 points
Total 100 points
The cost will be used in the cost formula below to compute the relative number of
cost points awarded to each proposal. The lowest cost will receive the maximum
number of cost points.
Lowest Cost
X Available Points = Points
Vendor Cost
Lean in Government Starter Kit Page 63
-------
Pre-Screening for Application for
Value Stream Mapping Events
Identify the area of study:
Is the anticipated field of view manageable?
What are the current problems with the "value stream" for this area of study (from the
organization's perspective and from the customer's perspective)?
What is the extent of variation in the area of study?
What data is currently collected to measure activities in/about the area of study?
Who touches the "value stream"?
What is in and out of scope for the proposed value stream mapping workshop?
Who is directing the process?
What do your customers want that you are currently not able to supply?
Is there senior executive leadership support for this area of study?
Is there sufficient funding available to support the VSM for this area of study?
What is the anticipated schedule for the workshop(s)?
Lean in Government Starter Kit Page 64
-------
Lean Event Sponsor Contract
The purpose of this contract is to help you and your team achieve successful event
outcomes. Critical behaviors to help ensure your team's success include:
Passionate—Enthusiastic support of the team to ensure team success.
Strategic—Using the event activity to advance a business objective by improving the
performance of the targeted process while being aware of the impact to the total system.
Committed—Engaged from pre-event planning through sustainment.
Risk Taking—Encourage creative thinking to drive paradigm-breaking results.
Open Minded—Influence the team to develop the best solution without introducing pre-
conceived ideas.
It is the responsibility of the team sponsor to ensure clarity regarding the coverage
of event expenses including team members coming in from other locations. It is
suggested that the team sponsor review with the team leader, as well as parties who
may be covering the event expenses, early in the planning stages of the event
activity.
I have read and support the position paper for this event and understand the critical role
that I play within the event process. As a team sponsor, I will follow the event-planning
checklist to ensure my role to support the overall success of the team.
Event Sponsor Signature:
Team Leader Signature:
Date:
Team leader is to retain the signed contract along with all other event documentation.
Lean in Government Starter Kit Page 65
-------
Pre-event Meeting Agenda
[Date, Time]
[Location]
I. Understand critical issues
o What is the purpose of this event?
o Why is it taking place?
o What is the desired outcome?
o What are the boundaries of the activity?
II. Understand and discuss high-level process steps
III. Develop scope statement based upon agreement of critical issue focus
IV. Define goals and objectives for the event
V. Identify pre-work for event: what, who to complete, etc.
VI. Which resources must/can be utilized?
Lean in Government Starter Kit Page 66
-------
Team Charter
[Agency]
[Division/Bureau of event and event name]
[Event Date]
SCOPE
The breadth, or area, of opportunity to change and improve [e.g., this event will address
the process from /of to .]
OBJECTIVES
[A narrower version of the scope of the improvement event.]
GOALS
Specific numbers or percentages
For example:
1. Reduce lead-time by XX%, from to .
PARTICIPANTS
Team leader Team Leader Name, Agency, bureau
Sub-team leader Sub-team leader Name, Agency, bureau
Consultant Consultant Name
Members Name, Agency, bureau
Name, Agency, bureau
Name, Agency, bureau
Name, Company Name
(No more than 20 people/event)
PRE-WORK
1. [e.g., determine average lead time] (name person responsible)
2.
FOLLOW-UP DATES
Month, day, year - 30 day
Month, day, year - 60 day
Month, day, year - 90 day
Month, day, year - 6 month
Month, day, year - 1 year
Lean in Government Starter Kit Page 67
-------
Example Team Charter
This event will address the Iowa DNR's Air Quality Bureau - Construction Permits
section, and the process for reviewing and issuing Complex Construction Projects.
Complex construction projects are generally those that involve Prevention of
Significant Deterioration (PSD) permitting, Air Toxics review under 112g of the
federal Clean Air Act, Netting evaluations for PSD credit, Non-attainment State
Implementation Plan (SIP) permitting, and other permitting that involves establishing
facility-wide or extensive permitting to limit potential emissions to reduce the
facility's regulatory burden.
1. Streamline the process to review and issue Complex Construction Projects and
reduce variability.
2. Develop a standard operating procedures guide for project reviewers and project
applicants.
3.
4.
Issue 100% of Complex PSD permits in a maximum of 180 calendar days (132
work days) from the application received date.
Reduce lead time for processing projects from 210 days (including 40-day
comment period) to 125 days (including 40-day comment period). (Reduction of
50% not including comment period).
Reduce requests for additional information by 50%.
Reduce the number of unanticipated comments in the comment period by 50%.
Team
Consultant:
Team leader: [Insert name here]
[Insert name here]
Daily Briefing Participants:
[Insert name here]
[Insert name here]
[Insert name here]
Process Mapping
Matrix Construction
Data Collection
Guide Materials
([Insert name here]) - Completed draft 8/16/04
([Insert name here])
([Insert name here])
([Insert name here])
Lean in Government Starter Kit Page 68
-------
Monday, Noon to 6:00 PM, Tuesday through Thursday, 7:30 AM to 7:00 PM,
Friday, 7:30 AM to Noon
Some additional after hours work may be required during the week.
Location: Air Quality Bureau, 7900, Suite 1, Hickman Road, Urbandale
Pre Event Meeting will be held at the Air Quality Bureau - October 5, 1:30-3:00
Lean in Government Starter Kit Page 69
-------
Pre-event Data Collection Guide
Pre-event Data Collection Steps
1) Initial map of the current process developed by the area that is going through the
kaizen event.
2) Determine from the map steps that can and cannot be changed, i.e., identify those
steps that are mandatory by rule.
3) Outline what items are currently tracked for time.
4) For those items currently tracked for time, determine longest item, quickest item and
an average of the items. Do not try to gather data here that you do not already know.
5) Have the staff write down what they do for a week. This includes the projects, as
well as meetings, site visits, telephone calls, regular meetings, etc.
The "Voice of the Customer" Data Considerations
Some questions to ask as part of the "voice of the customer" are the following:
1. What do they want?
2. When do they want it?
3. Why do they want it?
4. How do they use the product and how much of it do they use?
These questions will ultimately help in determining the "value-added" steps in the
process, as well as provide potential design criteria for the final "product." The best
approach would be to ask our customers (select a few), or at least think through these
questions from their perspective. If the process has different customer segments, the
questions could be asked for each one. As above, this information would be useful for
goal setting purposes.
Bench marking would also be helpful in establishing goals for the event. Additionally, it
could equip the team with example strategies for achieving the goals for the event.
!:\yi r i-nkt ^V'TLML ur i;.t ••: w LJJDL:
Number of process steps
Total lead time
Data on staffing needs
Data on staff time
Cycle time
Data on transaction volume in process (e.g., number of applications)
Number of handoffs
Amount of backlog
Rework percentage (e.g., percent of permits needing rework)
Lean in Government Starter Kit Page 70
-------
Kaizen Event Agenda
[Date]
[Location]
Monday: Training Day
1:30 P.M. Team member introduction.
1:45 P.M. Training.
4:30 P.M. Adjourn for the day.
Tuesday: Day of Discovery
8:00 A.M Work on process mapping, data needs, opportunities for waste
elimination, and review ideas against scope and objectives.
12:00 P.M. Working lunch.
12:30 P.M. Continue with previous work. Create implementation plan.
5:00 P.M. Draft Wednesday assignment.
5:3 0 or later Adj ourn for the day.
Wednesday: Do Day
8:00 A.M. Review Tuesday work. Begin working on selected projects.
Sub-teams report progress.
12:00 P.M. Working lunch.
12:30 P.M. Continue with previous work. Sub-teams report progress.
5:00 P.M. Sub-teams report-out. Make Thursday assignments.
5:3 0 or later Adj ourn for the day.
Thursday: Do, Re-Do, Document Day
8:00 A.M. Review Wednesday work. Continue Wednesday's work.
Sub-teams complete specific opportunities for improvement and report-
out. Implement new process operation procedures, forms, process map,
and baseline data.
12:00 A.M. Working lunch.
12:30 P.M. Continue with previous work. Document changes and complete the new
process. Report out from sub-teams and review all work to ensure
everything is complete.
5:00 P.M. Prepare for Friday's presentation.
5:3 0 or later Adj ourn for the day.
Friday: Day of Celebration
7:30 A.M. Finish work on presentation.
10:00 A.M. Team presentation.
11:00 A.M. Adjourn event. Thank you!
Lean in Government Starter Kit Page 71
-------
Lean Event Supplies List
Note: Supplies quantities are for an event with approximately 18 people.
Description
Perforated Note Pads (White)
Butcher Paper Roll 36" W X 150' L
Self Stick Easel Pads
Construction Paper (assorted)
Sticky Notes (pastel color) 3"X5"
Sticky Notes (florescent color) 3"X5"
Ballpoint pens (Black or Blue)
Permanent Markers (Black)
Flip Chart Markers (4 color)
Removable Glue Stick
Adhesive Spray
Masking Tape 1"X 60yards
Scissors
Twin Pocket Portfolios 25 per box
Hang Name Badges 50 per box
Easels for easel pads
GRAND TOTAL
Qty
2
1
2
4
3
1
20
6
4
4
2
2
8
1
1
4
Estimated List
Price
$12.73 DZ
$13.04 RL
$25.26PK
$1.36 PK
$5.05 PK
$5.91 PK
$.60 EA
$.75 EA
$1.95 ST
$.84 EA
$8.12
$5.71 RL
S1.45EA
$4.21 BX
$10.95 BX
$14.12 EA
Estimated Total
Cost
$25.46
$13.04
$46.52
$5.44
$15.15
$5.91
$12.00
$4.50
$7.80
$3.36
$16.24
$11.42
$11.60
$4.21
$10.95
$56.48
$250.08
Lean in Government Starter Kit Page 72
-------
Lean Event Logistics Checklist
6 weeks before event
a Aid in finding meeting rooms
- Monday 1:30-4:30 - T-TH8-5:30 - F 7:30-noon
° Fridays - Reserve the report-out location
a Order supplies
2 weeks before event
a Order meals
a Make nametags (get list from team leader)
a Prepare team member folder (agenda, charter, nametags)
1st Day of event
a Help team leader setup room
a Make coffee, setup all coffee supply (1 hour before start of event)
a Set out team member folder
a End of day disconnect coffee pot
2nd, 3rd, and 4th Day of event
a Make coffee
a Bring breakfast into room
a Fill cooler with pop, juice and water
a Bring lunch into room
a Bring snacks into room
a Order dinner (if necessary)
a Assist in clean up at the end of the day
5th Day of event
a Make coffee
a Bring breakfast into room
a Setup snack/coffee/drink to the report-out location (if necessary)
a Assist in clean up at the end of report
a Collect and store all extra meal supplies
After the event
a Gather all receipts
a Fill out Travel Payment to pay vendors
a Summarize event evaluations
Lean in Government Starter Kit Page 73
-------
Frequently Asked Questions about Lean
1. Are we compromising environmental protection?
This is not about loosening environmental regulations or our agency's
commitment to environmental protection. We are looking for efficiencies in
workflow, paper processing, number of steps in our process, etc. In fact, our
goals are to enhance our ability to protect the environment by being able shift
more time and resources on environmental protection activities.
2. Will anyone lose his or her job by making this process so efficient?
Our people are very important and will continue to be part of this agency.
Some people's job duties may change and some may have different office
locations or configurations. But all staff will remain part of this agency.
3 Municipalities, consulting engineers, and other external entities slow
down the permitting process. How are they involved, and who will make
them more efficient?
Outside stakeholders will take part in the event to help identify opportunities
and concerns. However, this is not about how other organizations conduct
processes, which we cannot control. Rather, we are focusing on what we can
control, and that is how we move a permit through the approval process.
4 What guarantees do we have that this will actually help the process?
Lean is a proven methodology used to break through barriers and cut through
bureaucracy, helping teams reach their goals.
5. Why are we doing this on [Event Name]? Why not another issue?
First, [Event Name] meets the three criteria for undertaking a Lean event: it
should be a large-volume process; it should use the same steps every time; and
it should be a core business activity. Second, we see this issue as an integral
step to improving the water quality in the State.
6 Have we messed up? Have we done something wrong?
The [Agency] is proud of the professionalism and performance of this staff.
Conducting a Lean event is a way to enhance that performance. The goal is to
give people the tools to do their jobs better. Each of us, in our own work
areas, could benefit from that type of assistance.
7 Is this a test of my job performance? Will I get in trouble for not doing
well in my job?
These events are performed under the assumption that everyone involved is
already doing their best—but that with some assistance, efforts can be altered
to lessen steps, delays, and time, with no loss of performance or quality.
Improvements will focus on reducing the time that no one is working on a
project. The time it sits in someone's in-box or is waiting for a reply is waste
that can be reduced.
Lean in Government Starter Kit Page 74
-------
8 How can you expect to get meaningful change in one week?
These events are specifically engineered to achieve results in an intense, one-
week work session. Additionally, preparation has taken place prior to the
actual event.
9. How can they understand something as complex as [Event Name or
Process] in a week?
The participants will learn the steps in the process, not how to conduct the
process. The process will be laid out in graphical form to make it easier to
understand the sequence and how steps are interrelated.
10. Who is involved and why?
The team that will be designing the new process is composed of [Team
Members], other Agency employees involved in the [Event Name], and some
of the people who are impacted by the process or who impact the process. All
of these different viewpoints are important in designing a better process.
11 Even if I'm not directly involved on the team, what will I need to do
during that week?
You may be asked questions by the team members to clarify your part in the
process. Please take the time to answer their questions completely. Team
members may also ask to observe and time you while you complete a step in
the process or discuss the time necessary to complete a step.
12 Will people be in my office? Will they observe us talking about
confidential issues, sensitive operations, controversial issues, sensitive
policy issue debates, and phone calls that all occur each week?
The team is not interested in specific projects, but how the process works in
general.
13. What happens if I have to leave during the week?
If you are a member of the team, please coordinate your absence with the
team leader, [team leader name]. If you are not on the team, you only need to
coordinate your absence with your supervisor, as usual.
14 Will the recommendations be rigid or able to change in the future if they
fail or cause unintended consequences?
The team will not be making recommendation—they will design an improved
process that will be implemented immediately. The new process will be
tested during the event, but if adjustments need to be made later, they will be
made.
15 How is this process to be judged a success or failure?
Data are being gathered on how well the process performs before the event
and data will be collected after the event for comparison.
Lean in Government Starter Kit Page 75
-------
Team Leader Daily Agenda
Morning
a Arrange the room in the picture shown (get someone to help)
a Get the supplies, easel and easel pad
a Setup 1 easel and easel pad
a Setup the laptop, projector and speakers
a Set out the folder, training manual and nametag
Afternoon
a Greet everyone when they arrive
a Start promptly at 1:30 p.m.
a Welcome everyone and introduce yourself
a Go through logistics (parking, building access, cell phones, restrooms, meals, etc.)
a Go through agenda (warn team of potential late nights on Tuesday, Wednesday,
and Thursday)
a Go through ground rules
a Have everyone introduce themselves
1. Who are you? Where do you work?
2. What are your goals this week?
3. What you like to do when you are not at work?
a On the easel pad, write "Goals of Team Members" and capture the team member
goals
a Post "Goals of Team Members" on the wall
a Introduction from senior manager
a Introduce consultant and/or trainer (begin training)
a Review the goals and objectives
a Discuss pre-event data collected
a Let team know they can leave folder in the room
a Remind team of start time tomorrow
Evening
a Disconnect laptop and projector (store in save location overnight)
a Tape roll paper on the East and West wall (get 1-2 people to help)
a Spray paper with adhesive glue
a Setup 2 easels and easel pad
a Write on easel pad and post on the wall "Parking Lot/Bike Rack" and
"Homework"
Lean in Government Starter Kit Page 76
-------
a Layout scissors, color pad, and markers for team member to volunteer for flow
mapping
a Tidy up the room (unplug the coffee pot, pick up bottles and cups)
Morning
a Start on time
a Ask if anyone have question about yesterday' s training
a Start training on flow mapping
a Ask for volunteer for each flow mapping task
a Review the goals and objectives
a Start mapping current state (Identify functions, steps, handoffs)
a Visit process site for walk through of process.
a Identify value-added activities and delays on map
a Estimate lead time (best case, worst case, and average) based on data collected
Afternoon
a Count the number of steps, handoffs, loops, delay, value add, delay
a Calculate lead time (best case, worst case, and average)
a Make arrangements for dinner by 3 p.m. if it is needed
a Attend 4 p.m. daily report out to management
a Remind team of start time tomorrow
Evening
a Setup 3 easels and easel pad
a Tidy up the room (unplug the coffee pot, pick up bottles and cups, markers and
note pads)
Morning
a Start on time
a Communication staff takes team pictures
a Ask if anyone have questions or comments about the current process
a Give the team 20 minutes to write down what they think the ideal state should be
individually
a Capture the team members ideas on easel pad
a Break up team into groups (5-6 people per group)
a Give each group some of the ideas and ask them to apply it to de-selection matrix
Lean in Government Starter Kit Page 77
-------
a Ask group to write down on easel pads 7 ways of implementing the ideas in the
High Impact and Low Difficulty quadrant
a Have each group report to the team
Afternoon
a Start to map the ideal/future process
a Capture Parking Lot/Bike Rack and Homework items on easel pad
a Identify value-added activities and delays on new process map
a Estimate lead time (best case, worst case, and average) based on data collected
a Count the number of steps, handoffs, loops, delay, value add, delay
a Calculate lead time (best case, worst case, and average)
a Make arrangements for dinner by 3 p.m. if it is needed
a Attend 4 p.m. daily report out to management
a Remind team of start time tomorrow
Evening
a Setup 3 easels and easel pad
a Tidy up the room (unplug the coffee pot, pick up bottles and cups, markers and
note pads)
Morning
a Setup laptop and projector
a Ask if anyone have concerns or comments about the new process map
a Review the goals and objectives
a Review the parking lot and homework items
a Ask team to volunteer to work on homework items
a Collect the completed homework items from each group
Afternoon
a Assign/Volunteer team member to homework items that are incomplete
a Review "Goals of Team Members"
a Prepare report-out presentation
a Inform team about flow of report-out presentation (where to stand, introduce next
speaker, what to expect, who answer questions from audience)
a Assign/Volunteer team member to different slides in the presentation
a Vote on team name
a Send team name to communication staff
a Prepare report-out summary
a Make 50 copies of report-out summary
Lean in Government Starter Kit Page 78
-------
a Attend 4 p.m. daily report out to management
a Remind team of start time tomorrow
Evening
a Disconnect laptop and projector (store in save location overnight)
a Tidy up the room (unplug the coffee pot, pick up bottles and cups, markers and
note pads)
Morning
a Setup laptop, projector and speaker
a Show " Staff Motivation" video
a Distribute "Kaizen Event Evaluation" to team members
a Collect filled out "Kaizen Event Evaluation"
a Setup laptop and projector in the auditorium
a Practice report-out presentation
a Collect team participation certificate from communication staff
a Distribute report-out summary to audience
a Report-out presentation
a Return supplies to team leader
a Put the room back in order (get 1-2 people to help)
Afternoon
a Give kaizen event evaluation to team leader
a Place all files for event on computer server
Lean in Government Starter Kit Page 79
-------
Lean Event Homework
As of:
Event #:
Event Name:
Owner:
1
2
3
4
5
6
7
8
Hold Meeting to Standardize "Front
End" Documents With Other
Funders/ Agencies
Gabe
02/17/06
Notes:
Lean in Government Starter Kit Page 80
-------
Report-out Summary
DATE:
SCOPE:
OBJECTIVE:
GOALS:
RESULTS:
Steps
Value Added Steps
Decisions
Loop Back
Handoffs
Delays
Functions in Process
Old
New
% Change
1 - (new # / old #)
IMPLEMENTED
[List actions implemented]
Lean in Government Starter Kit Page 81
-------
Event Evaluation Form
Event:
Date:
Facilitator:
You have just completed an event to improve one of your processes. We are interested in
your opinion on how things went during the event. We are continuously trying to
improve the effectiveness of the events. Below is a list of questions that will help us
improve future events. Please be open and honest with your ratings and comments.
Thank you.
On a scale of 1 to 5 please rate the questions below.
1 - Strongly Disagree 2 - Disagree 3 - Neutral 4 - Agree 5 - Strongly Agree
Rating
Questions
I was given at least 2 weeks notice prior to the event.
The training on Day 1 was effective and prepared me for the event.
The consultant was effective teaching and guiding the team through the
event.
The consultant listened to my ideas and suggestions.
The team leader was effective and helpful through the event.
When my ideas or suggestions were not used, the reasons were explained
me.
to
Management support and direction was adequate.
The time spent this week was productive.
I have increased my understanding of the value of continuous improvement.
The material provided was useful.
The food and beverages provided were adequate.
What did you find most useful during the event?
What suggestions or comments do you have that could help us improve future events?
Lean in Government Starter Kit Page 82
-------
Lean Event Follow-up Action Tracking Form
As of:
Event #:
Event Name:
Owner:
Hold Meeting to
Standardize "Front
End" Documents With
Other Funders/ Agencies
Gabe
02/17/06
Notes:
Parking Lot Issues:
o [Add outstanding parking lot issues here]
Lean in Government Starter Kit | Page 83
-------
Agency Lean Coordinator Job Description
This position is located in the Director's Office under the immediate supervision of the
Deputy Director and functions as a program manager for the Agency's process
improvement program. The person in this position is responsible for implementing and
managing the department's Lean process improvement program, including the
deployment of training and other duties that will enhance organizational efficiency and
support a culture of continuous improvement and customer satisfaction.
Lean Deployment and Facilitation: Develop and implement an action plan for the
deployment of all aspects of the Department's Lean process improvement program,
including, but not limited to kaizen, 5S and Design for Lean Six Sigma Events.
Responsible for working with department managers in identifying areas for process
improvement events, establishing objectives for each project, and selecting cross-
functional team members and leaders. Act in the capacity of the facilitator for each
event. Coordinate each project/event phase and ensure that participants and stakeholders
have the tools and resources they need, necessary information, and guidance to enable
them to fully engage in the process and maximize the potential outcome of each event.
Tracking Progress: Develop and implement an action plan for tracking, analyzing and
reporting return on investment of departmental programs that have undergone process
improvement initiatives. Monitor the progress of projects, including ongoing status
reviews. Ensure that the database is current relative to process improvement activities.
Responsible for coordinating and participating in 30 day, 60 day, 90 day, 6 month, and 1
year follow-up meetings for each event to ensure follow-up activities are completed and
improvements are realized and maintained. Develop a comprehensive report which
delineates the status and outcomes of each event, including, but not limited to efficiencies
gained, increased customer satisfaction and or reduced costs or savings realized. Conduct
formal reviews with the management team on a quarterly basis to review
accomplishments, identify areas for improvement, and respond to questions.
Training: Coordinate the training of Agency staff on Lean process improvement
techniques, including a plan for deployment of training to all departmental staff. Ensure
that tools, resources and instructional materials are developed, updated as necessary and
maintained to meet ongoing needs. Responsible for tracking participation and associated
costs of time and materials for training deployment. Establish a library of learning
materials, both electronic and paper that can be made available to interested staff.
Conduct research focused on benchmarking world-class business process performance
and utilize findings to assist supervisors in establishing tangible measures of time, cost,
and quality.
Communications: Develop and implement an effective strategy for communicating the
status and results of the Agency improvement efforts to department partners, customers
and staff. This includes, but is not limited to the development of an Internet presence to
showcase departmental activities. Keep staff informed of revised procedures and
methods and related work changes as implemented.
Lean in Government Starter Kit Page 84
-------
United States Environmental Protection Agency
www.epa.gov/lean
May 2009
EPA-100-K-09-007
------- |