Publication Numbers:
                                            EPA: EPA-505-B-04-900C
                                            DoD: DTIC ADA 427486
         Intergovernmental Data Quality Task Force

                     Workbook for
  Uniform Federal Policy for Quality Assurance
                      Project Plans

Evaluating, Assessing, and Documenting Environmental Data
               Collection and Use Programs

              Part 2A: UFP-QAPP Workbook
                                ^

               This Workbook supplements Part 1 of the UFP-
               QAPP, the  UFP-QAPP Manual.  Proper
               completion of these worksheets  requires
               knowledge of the QAPP elements explained in the
               Manual.
                           Final
                         Version 1
                        March 2005

-------
This page intentionally left blank.

-------
                              TABLE OF CONTENTS

INTRODUCTION
QAPP Worksheet #1.   Title and Approval Page  	1
QAPP Worksheet #2.   QAPP Identifying Information 	2
QAPP Worksheet #3.   Distribution List  	7
QAPP Worksheet #4.   Project Personnel  Sign-Off Sheet	8
QAPP Worksheet #5.   Project Organizational Chart	9
QAPP Worksheet #6.   Communication Pathways	10
QAPP Worksheet #7.   Personnel Responsibilities and Qualifications Table 	11
QAPP Worksheet #8.   Special Personnel  Training Requirements Table  	12
QAPP Worksheet #9.   Project Scoping Session Participants Sheet  	13
QAPP Worksheet #10.  Problem Definition  	14
QAPP Worksheet #11.  Project Quality Objectives/Systematic Planning Process Statements . . 15
QAPP Worksheet #12.  Measurement Performance Criteria Table  	16
QAPP Worksheet #13.  Secondary Data Criteria and Limitations Table 	17
QAPP Worksheet #14.  Summary of Project Tasks  	18
QAPP Worksheet #15.  Reference Limits and Evaluation Table  	19
QAPP Worksheet #16.  Project Schedule/Timeline Table 	20
QAPP Worksheet #17.  Sampling Design and Rationale  	21
QAPP Worksheet #18.  Sampling Locations and Methods/SOP Requirements Table	22
QAPP Worksheet #19.  Analytical SOP Requirements Table	23
QAPP Worksheet #20.  Field Quality  Control Sample Summary Table	24
QAPP Worksheet #21.  Project Sampling SOP Reference Table	25
QAPP Worksheet #22.  Field Equipment Calibration, Maintenance, Testing, and Inspection
                     Table	26
QAPP Worksheet #23.  Analytical SOP Reference Table	27
QAPP Worksheet #24.  Analytical Instrument Calibration Table	28
QAPP Worksheet #25.  Analytical Instrument and Equipment Maintenance, Testing, and
                     Inspection Table	29
QAPP Worksheet #26  Sample Handling System  	30
QAPP Worksheet #27.  Sample Custody Requirements	31
QAPP Worksheet #28.  QC Samples Table	32
QAPP Worksheet #29.  Project Documents and Records Table	33
QAPP Worksheet #30.  Analytical Services Table	34
QAPP Worksheet #31.  Planned Project Assessment Table 	35
QAPP Worksheet #32.  Assessment Findings and Response Actions	36
QAPP Worksheet #33.  QA Management Reports Table 	37
QAPP Worksheet #34.  Sampling and Analysis Verification (Step I) Process Table	38
QAPP Worksheet #35.  Sampling and Analysis Validation (Steps Ha and lib) Process Table  . 39
QAPP Worksheet #36.  Sampling and Analysis Validation (Steps Ha and lib) Summary Table 40
QAPP Worksheet #37.  Data Usability Assessment 	41
IDQTF, UFP-QAPP Workbook VI, March 2005
                                                                             Final

-------
   WORKBOOK FOR UNIFORM FEDERAL POLICY FOR QUALITY ASSURANCE
                                  PROJECT PLANS

                                  INTRODUCTION
This Workbook for Uniform Federal Policy for Quality Assurance Project Plans is Part 2 A of the
Uniform Federal Policy for Quality Assurance Project Plans (UFP-QAPP). It provides examples
of worksheets to assist with the preparation of QAPPs in accordance with Part  1 of the UFP-QAPP
(the UFP-QAPP Manual) and Section 6 (Part B) of Quality Systems for Environmental Data  and
Technology Programs -Requirements with guidance for use, ANSI/ASQ E4 (February 2004). This
Workbook may be used by the lead organization and its contractors to assist with the preparation
of QAPPs for environmental data gathering activities.

Each worksheet addresses specific requirements of the UFP-QAPP.  Both the UFP-QAPP Manual
and the Workbook are intended to be comprehensive and are not intended to be program-specific.
Since the content and level of detail in a specific QAPP will  vary by program, by the work being
performed, and by the intended use of the data, specific worksheets may not be applicable to all
projects.

The  ultimate success of an environmental program or project depends on the quality of the
environmental data collected and used in decision-making, and this may depend significantly on the
adequacy of the QAPP  and its effective implementation.  It is recommended that the individual
worksheets included in this Workbook be taken to the project scoping and planning sessions.  The
use of the worksheets will aid in identifying the critical project information that will ensure that the
right type, quality, and quantity of data are collected to meet all of the project's quality objectives.
Though the format of each worksheet is not mandatory, the information required on the worksheets
must still be presented in the QAPP, as appropriate to the project. In addition,  QAPP preparers are
encouraged to develop additional tables, as appropriate to the project.  Sufficient written discussion
in text format  should accompany all tables.  Certain sections,  by their nature, will require more
written discussion than others. In particular, Section 3.1.1 should provide an in-depth explanation
of the sampling design rationale, and Section 5.2 should describe the procedures and criteria that
will be used for data review.
IDQTF, UFP-QAPP Workbook V1, March 2005                                          Final

-------
Site Name/Project Name:
Site Location:
                                  QAPP Worksheet #1
                             (UFP-QAPP Manual Section 2.1)
                                 Title and Approval Page
Title:
Revision Number:
Revision Date:
Page	of	
Document Title
Lead Organization
Preparer's Name and Organizational Affiliation
Preparer's Address, Telephone Number, and E-mail Address


Preparation Date (Day/Month/Year)

Investigative Organization's Project Manager:	
                                                           Signature
Printed Name/Organization/Date

Investigative Organization's Project QA Officer:
                                                           Signature
Printed Name/Organization/Date

Lead Organization's Project Manager:
                                                           Signature
Printed Name/Organization/Date
Approval Signatures:
                                                           Signature
                                                   Printed Name/Title/Date
Approval Authority

Other Approval Signatures:
                                                           Signature
                                                  Printed Name/Title/Date
Document Control Number:

-------
                                  QAPP Worksheet #2
                           (UFP-QAPP Manual Section 2.2.4)
                             QAPP Identifying Information

Site Name/Project Name:                                   Title:
Site Location:                                              Revision Number:
Site Number/Code:                                         Revision Date:
Operable Unit:                                             Page	of	
Contractor Name:
Contractor Number:
Contract Title:
Work Assignment Number:

1.  Identify guidance used to prepare QAPP:
2.  Identify regulatory program:

3.  Identify approval entity:	
4.  Indicate whether the QAPP is a generic or a project-specific QAPP. (circle one)

5.  List dates of scoping sessions that were held:	
6.  List dates and titles of QAPP documents written for previous site work, if applicable:

   Title                                                                 Approval Date
7.  List organizational partners (stakeholders) and connection with lead organization:
8.  List data users:
9.  If any required QAPP elements and required information are not applicable to the project, then
   circle the omitted QAPP elements and required information on the attached table. Provide an
   explanation for their exclusion below:	

-------
                                 QAPP Worksheet #2
                            QAPP Identifying Information
                                     (continued)
Title:
Revision Number:
Revision Date:
Page	of	
Identify where each required QAPP element is located in the QAPP (provide section, worksheet,
table, or figure number) or other project planning documents (provide complete document title,
date, section number, page numbers, and location of the information in the document). Circle
QAPP elements and required information that are not applicable to the project. Provide an
explanation in the QAPP.
Required QAPP Element(s) and
Corresponding QAPP Section(s)
Required Information
Crosswalk to Related
Documents
Project Management and Objectives
2. 1 Title and Approval Page
2.2 Document Format and Table of Contents
2.2.1 Document Control Format
2.2.2 Document Control Numbering System
2.2.3 Table of Contents
2.2.4 QAPP Identifying Information
2.3 Distribution List and Project Personnel Sign-
Off Sheet
2.3.1 Distribution List
2.3.2 Project Personnel Sign-Off Sheet
2.4 Project Organization
2.4.1 Project Organizational Chart
2.4.2 Communication Pathways
2.4.3 Personnel Responsibilities and
Qualifications
2.4.4 Special Training Requirements and
Certification
2.5 Project Planning/Problem Definition
2.5.1 Project Planning (Scoping)
2.5.2 Problem Definition, Site History, and
Background
2.6 Project Quality Objectives and Measurement
Performance Criteria
2.6.1 Development of Project Quality
Objectives Using the Systematic
Planning Process
2.6.2 Measurement Performance Criteria
- Title and Approval Page
- Table of Contents
- QAPP Identifying
Information
- Distribution List
- Project Personnel Sign-Off
Sheet
- Project Organizational
Chart
- Communication Pathways
- Personnel Responsibilities
and Qualifications Table
- Special Personnel Training
Requirements Table
- Project Planning Session
Documentation (including
Data Needs tables)
- Project Scoping Session
Participants Sheet
- Problem Definition, Site
History, and Background
- Site Maps (historical and
present)
- Site-Specific PQOs
- Measurement Performance
Criteria Table







-------
                                     QAPP Worksheet #2
                               QAPP Identifying Information
                                          (continued)
                             Title:
                             Revision Number:
                             Revision Date:
                             Page	of	
       Required QAPP Element(s) and
       Corresponding QAPP Section(s)
   Required Information
Crosswalk to Related
     Documents
  2.7  Secondary Data Evaluation
  Sources of Secondary Data
  and Information
  Secondary Data Criteria
  and Limitations Table
2.8  Project Overview and Schedule
  2.8.1  Proj ect Overview
  2.8.2  Project Schedule
- Summary of Project Tasks
- Reference Limits and
  Evaluation Table
- Project Schedule/Timeline
  Table
                                  Measurement/Data Acquisition
3.1   Sampling Tasks
  3.1.1  Sampling Process Design and Rationale
  3.1.2  Sampling Procedures and Requirements
     3.1.2.1   Sampling Collection Procedures
     3.1.2.2   Sample Containers, Volume, and
             Preservation
     3.1.2.3   Equipment/Sample Containers
             Cleaning and Decontamination
             Procedures
     3.1.2.4   Field Equipment Calibration,
             Maintenance, Testing, and
             Inspection Procedures
     3.1.2.5   Supply Inspection and Acceptance
             Procedures
     3.1.2.6   Field Documentation Procedures
- Sampling Design and
  Rationale
- Sample Location Map
- Sampling Locations and
  Methods/ SOP
  Requirements Table
- Analytical Methods/SOP
  Requirements Table
- Field Quality Control
  Sample Summary Table
- Sampling SOPs
- Project Sampling SOP
  References Table
- Field Equipment
  Calibration, Maintenance,
  Testing, and Inspection
  Table
3.2  Analytical Tasks
  3.2.1  Analytical SOPs
  3.2.2  Analytical Instrument Calibration
        Procedures
  3.2.3  Analytical Instrument and Equipment
        Maintenance, Testing, and Inspection
        Procedures
  3.2.4  Analytical Supply Inspection and
        Acceptance Procedures
- Analytical SOPs
- Analytical SOP References
  Table
- Analytical Instrument
  Calibration Table
- Analytical Instrument and
  Equipment Maintenance,
  Testing, and Inspection
  Table

-------
     QAPP Worksheet #2
QAPP Identifying Information
        (continued)
Title:
Revision Number:
Revision Date:
Page	of	
Required QAPP Element(s) and
Corresponding QAPP Section(s)
3.3 Sample Collection Documentation,
Handling, Tracking, and Custody Procedures
3.3.1 Sample Collection Documentation
3.3.2 Sample Handling and Tracking System
3.3.3 Sample Custody
3.4 Quality Control Samples
3.4. 1 Sampling Quality Control Samples
3.4.2 Analytical Quality Control Samples
3.5 Data Management Tasks
3.5.1 Project Documentation and Records
3.5.2 Data Package Deliverables
3.5.3 Data Reporting Formats
3.5.4 Data Handling and Management
3.5.5 Data Tracking and Control
Required Information
- Sample Collection
Documentation Handling,
Tracking, and Custody
SOPs
- Sample Container
Identification
- Sample Handling Flow
Diagram
- Example Chain-of-Custody
Form and Seal
- QC Samples Table
- Screening/Confirmatory
Analysis Decision Tree
- Project Documents and
Records Table
- Analytical Services Table
- Data Management SOPs
Crosswalk to Related
Documents



Assessment/Oversight
4. 1 Assessments and Response Actions
4.1.1 Planned Assessments
4.1.2 Assessment Findings and Corrective
Action Responses
4.2 QA Management Reports
- Assessments and Response
Actions
- Planned Project
Assessments Table
- Audit Checklists
- Assessment Findings and
Corrective
Action Responses Table
- QA Management Reports
Table
4 . 3 Final Proj ect Report




-------
     QAPP Worksheet #2
QAPP Identifying Information
        (continued)
Title:
Revision Number:
Revision Date:
Page	of	
Required QAPP Element(s) and
Corresponding QAPP Section(s)
Required Information
Crosswalk to Related
Documents
Data Review
5.1 Overview
5.2 Data Review Steps
5.2.1 Step I : Verification
5.2.2 Step II: Validation
5.2.2. 1 Step Ha Validation Activities
5.2.2.2 Step lib Validation Activities
5.2.3 Step III: Usability Assessment
5.2.3.1 Data Limitations and Actions from
Usability Assessment
5.2.3.2 Activities
5 . 3 Streamlining Data Review
5.3. 1 Data Review Steps To Be Streamlined
5.3.2 Criteria for Streamlining Data Review
5.3.3 Amounts and Types of Data Appropriate
for Streamlining

- Verification (Step I)
Process Table
- Validation (Steps Ha and
lib) Process Table
- Validation (Steps Ha and
lib) Summary Table
- Usability Assessment





-------
QAPP Worksheet #3
(UFP-QAPP Manual Section 2.3.1)
List those entities to whom copies of the approved
QAPP, subsequent QAPP revisions, addenda, and amendments.
Title:
Revision Number:
Revision Date:
Page	of	
                                                       Distribution List
QAPP Recipients












Title












Organization












Telephone Number












Fax Number












E-mail Address












Document Control
Number













-------
QAPP Worksheet #4
(UFP-QAPP Manual Section 2.3.2)
Have copies of this form signed by key project personnel from each organization
to indicate that they have read the applicable sections of the QAPP and will
perform the tasks as described.  Ask each organization to forward signed sheets to
the central project file.
Title:
Revision Number:
Revision Date:
Page	of	
                                                   Project Personnel Sign-Off Sheet
Organization:
Project Personnel










Title










Telephone Number










Signature










Date QAPP Read











-------
QAPP Worksheet #5
(UFP-QAPP Manual Section 2.4.1)
Identify reporting relationships between all organizations
involved in the project, including the lead organization and all contractor and subcontractor
organizations. Identify the organizations providing field sampling, on-site and off-site analysis,
and data review services, including the names and telephone numbers of all project managers,
project team members, and/or project contacts for each organization.
                                                                                                    Title:
                                                                                                    Revision Number:
                                                                                                    Revision Date:
                                                                                                    Page	of	
                                                              Project Organizational Chart
                      C 'on tractor Organization:
                      Role:
                      Project Manager
                                                                       Approvul Authonty:
                                                                        Lead Organization:
                                                                 Lead Organization Project Manager:
                                            C Contractor Organization:
                                                                Project \Ianager
                                                                                                              1 ,end Orgatii/ation
                                                                                                              OA Officer:
                                              C 'on tractor Organization:
                                                                                                           Role
                                                                                                           Project Manager
Subcon tractors:
Organization:
                    Project Contact: -

                    Organization:	
                    Project Contact: .
                    Orgarii/ation:	
                        t < 'nntitct:
Su bcon t r actc > rs:
Organization: _
Role: 	
                                         Project Contact

                                         Organisation: .....
                                         Role: ^^_^^
                                         Project Contact:
                                         Organization:	
                                         Role: 	
                                                             Project Contact:
                                                                                                         Subcoti tractors
                                                                                                         Organization; ..
                                            Project Contact:

                                            Organization: 	
                                            Role: ^^_^^_
                                            Project C 'ontact:
                                            Organization:	
                                                                                     Project Contact: -

-------
QAPP Worksheet #6
(UFP-QAPP Manual Section 2.4.2)
Describe the communication pathways and modes of communication that will
be used during the project, after the QAPP has been approved. Describe the procedures
for soliciting and/or obtaining approval between project personnel, between different
contractors, and between samplers and laboratory staff.  Describe the procedure that
will be followed when any project activity originally documented in an approved QAPP
requires real-time modification to achieve project goals or a QAPP amendment is required.
Describe the procedures for stopping work and identify who is responsible.

                                                  Communication Pathways
Title:
Revision Number:
Revision Date:
Page	of	
Communication Drivers








Responsible Entity








Name








Phone Number








Procedure (Timing, Pathways, etc.)








                                                              10

-------
QAPP Worksheet #7
(UFP-QAPP Manual Section 2.4.3)
Identify project personnel associated with each organization, contractor,
and subcontractor participating in responsible roles.  Include data users,
decision-makers, project managers, QA officers, project contacts for
organizations involved in the project, project health and safety officers,
geotechnical engineers and hydrogeologists, field operation personnel,
analytical services, and data  reviewers. Identify project team members
with an asterisk (*). Attach resumes to this worksheet or note the location
of the resumes.
Title:
Revision Number:
Revision Date:
Page	of	
                                        Personnel Responsibilities and Qualifications Table
Name










Title










Organizational Affiliation










Responsibilities










Education and Experience
Qualifications










                                                                11

-------
QAPP Worksheet #8
(UFP-QAPP Manual Section 2.4.4)
Provide the following information for those projects requiring personnel
with specialized training. Attach training records and/or certificates to
the QAPP or note their location.
Title:
Revision Number:
Revision Date:
Page	of	
                                          Special Personnel Training Requirements Table
Project
Function





Specialized Training -
Title or Description of
Course





Training
Provider





Training
Date





Personnel/Groups
Receiving
Training





Personnel
Titles/
Organizational
Affiliation





Location of Training
Records/Certificates1





JIf training records and/or certificates are on file elsewhere, document their location in this column. If training records and/or certificates do
not exist or are not available, then this should be noted.
                                                                12

-------
QAPP Worksheet #9
(UFP-QAPP Manual Section 2.5.1)
Complete this worksheet for each project scoping session held.
Identify project team members who are responsible for planning
the project.

                              Project Scoping Session Participants Sheet
Title:
Revision Number:
Revision Date:
Page	of	
Project Name
Projected Date(s) of Sampling
Project Manager

Date of Session:
Scoping Session Purpose:
Name



















Title














Site Name
Site Location



Affiliation



















Phone #



















E-mail Address



















Project Role














Comments/Decisions:
Action Items:
Consensus Decisions:
                                                 13

-------
QAPP Worksheet #10                                                                           Title:
(UFP-QAPP Manual Section 2.5.2)                                                                Revision Number:
Clearly define the problem and the environmental questions that should                               Revision Date:
be answered for the current investigation and develop the project                                     Page	of	
decision "If.., then..." statements in the QAPP, linking data results with
possible actions. The prompts below are meant to help the project team
define the problem.  They are not comprehensive.

                                                    Problem Definition
 The problem to be addressed by the project:


 The environmental questions being asked:


 Observations from  any site reconnaissance reports:


 A synopsis of secondary data or information from site reports:


 The possible classes of contaminants and the affected matrices:


 The rationale for inclusion of chemical and nonchemical analyses:


 Information concerning various environmental indicators:


 Project decision conditions ("If..., then..." statements):
                                                             14

-------
QAPP Worksheet #11                                                                            Title:
(UFP-QAPP Manual Section 2.6.1)                                                                 Revision Number:
Use this worksheet to develop project quality objectives (PQOs) in terms of type, quantity, and          Revision Date:
quality of data determined using a systematic planning process. Provide a detailed discussion            Page	of	
of PQOs in the QAPP.  List the PQOs in the form of qualitative and quantitative statements.
These statements should answer questions such as those listed below. These questions are
examples only, however; they are neither inclusive nor appropriate for all projects.


                               Project Quality Objectives/Systematic Planning Process Statements
 Who will use the data?

 What will the data be used for?

 What type of data are needed? (target analytes, analytical groups, field screening, on-site analytical or off-site laboratory techniques,
 sampling techniques)

 How "good" do the data need to be in order to support the environmental decision?

 How much data are needed? (number of samples for each analytical group, matrix, and concentration)

 Where, when, and how should the data be collected/generated?

 Who will collect and generate the data?

 How will the data be reported?

 How will the data be archived?
                                                             15

-------
QAPP Worksheet #12
(UFP-QAPP Manual Section 2.6.2)
Complete this worksheet for each matrix, analytical group, and concentration level.
Identify the data quality indicators (DQIs), measurement performance criteria (MFC),
and QC sample and/or activity used to assess the measurement performance for both the
sampling and analytical  measurement systems. Use additional worksheets
if necessary.  If MFC for a specific DQI vary within an analytical parameter, i.e., MFC
are analyte-specific, then provide analyte-specific MFC on an additional worksheet.

                                              Measurement Performance Criteria Table
Title:
Revision Number:
Revision Date:
Page	of	
Matrix
Analytical Group1
Concentration Level
Sampling Procedure2









Analytical
Method/SOP3







Data Quality Indicators (DQIs)






Measurement Performance Criteria






QC Sample and/or Activity Used to
Assess Measurement Performance






QC Sample Assesses Error
for Sampling (S),
Analytical (A) or both
(S&A)






'If information varies within an analytical group, separate by individual analyte.
2Reference number from QAPP Worksheet #21 (see Section 3.1.2).
Reference number from QAPP Worksheet #23 (see Section 3.2).
                                                                  16

-------
QAPP Worksheet #13
(UFP-QAPP Manual Section 2.7)
Identify all secondary data and information that will be used for
the project and their originating sources. Specify how the secondary data
will be used and the limitations on their use.
Title:
Revision Number:
Revision Date:
Page	of	
                                    Secondary Data Criteria and Limitations Table
Secondary Data






Data Source
(Originating Organization,
Report Title, and Date)






Data Generator(s)
(Originating Org., Data
Types, Data
Generation/Collection Dates)






How Data Will Be Used






Limitations on Data Use






                                                          17

-------
QAPP Worksheet #14                                                                     Title:
(UFP-QAPP Manual Section 2.8.1)                                                           Revision Number:
Provide a brief overview of the listed project activities.                                           Revision Date:
                                                                                         Page	of	

                                             Summary of Project Tasks
   Sampling Tasks:
   Analysis Tasks:
   Quality Control Tasks:
   Secondary Data:
   Data Management Tasks:
   Documentation and Records:
   Assessment/Audit Tasks:
   Data Review Tasks:
                                                        18

-------
QAPP Worksheet #15
(UFP-QAPP Manual Section 2.8.1)
Complete this worksheet for each matrix, analytical group, and concentration
level. Identify the target analytes/contaminants of concern and project-required
action limits. Next, determine the quantitation limits (QLs) that must be met to
achieve the project quality objectives. Finally, list the published and achievable
detection and quantitation limits for each analyte.
Title:
Revision Number:
Revision Date:
Page	of	
                                           Reference Limits and Evaluation Table
Matrix:
Analytical Group:
Concentration Level:
Analyte







CAS Number







Project Action
Limit
(applicable units)







Project
Quantitation Limit
(applicable units)







Analytical Method1
MDLs







Method QLs







Achievable Laboratory Limits2
MDLs







QLs







'Analytical MDLs and QLs are those documented invalidated methods.
2Achievable MDLs and QLs are limits that an individual laboratory can achieve when performing a specific analytical method.
                                                              19

-------
QAPP Worksheet #16
(UFP-QAPP Manual Section 2.8.2)
List all project activities as well as the QA assessments that will be
performed during the course of the project. Include the anticipated start and
completion dates.
Title:
Revision Number:
Revision Date:
Page	of	
                                            Project Schedule/Timeline Table
Activities










Organization










Dates (MM/DD/YY)
Anticipated Date(s)
of Initiation










Anticipated Date of
Completion










Deliverable










Deliverable Due Date










                                                           20

-------
QAPP Worksheet #17                                                                     Title:
(UFP-QAPP Manual Section 3.1.1)                                                          Revision Number:
Describe the project sampling approach.  Provide the rationale                                 Revision Date:
for selecting sample locations and matrices for each                                           Page	of	
analytical group and concentration level.

                                              Sampling Design and Rationale
 Describe and provide a rationale for choosing the sampling approach (e.g., grid system, biased statistical approach):
 Describe the sampling design and rationale in terms of what matrices will be sampled, what analytical groups will be analyzed and at
 what concentration levels, the sampling locations (including QC, critical, and background samples), the number of samples to be taken,
 and the sampling frequency (including seasonal considerations) [May refer to map or Worksheet #18 for details]:
                                                            21

-------
QAPP Worksheet #18
(UFP-QAPP Manual Section 3.1.1)
List all site locations that will be sampled and include sample/ ID number,
if available. (Provide a range of sampling locations of ID numbers if a site
has a large number.) Specify matrix and, if applicable, depth at which samples
will be taken. Only a short reference for the sampling location
rationale is necessary for the table. The text of the QAPP should clearly
identify the detailed rationale associated with each reference. Complete all
required information, using additional worksheets if necessary.
Title:
Revision Number:
Revision Date:
Page	of	
                                   Sampling Locations and Methods/SOP Requirements Table
Sampling
Location/ID
Number











Matrix











Depth
(units)











Analytical Group











Concentration
Level











Number of
Samples (identify
field duplicates)











Sampling SOP
Reference1











Rationale for
Sampling
Location











 Specify the appropriate letter or number from the Project Sampling SOP References table (Worksheet #21).
                                                            22

-------
QAPP Worksheet #19
(UFP-QAPP Manual Section 3.1.1)
For each matrix, analytical group, and concentration level, list the analytical
and preparation method/SOP and associated sample volume, container
specifications, preservation requirements, and maximum holding time.
Title:
Revision Number:
Revision Date:
Page	of	
                                           Analytical SOP Requirements Table
Matrix










Analytical Group










Concentration
Level










Analytical and
Preparation
Method/SOP
Reference1










Sample Volume










Containers
(number, size,
and type)










Preservation
Requirements
(chemical,
temperature,
light protected)










Maximum
Holding Time
(preparation/
analysis)










 Specify the appropriate reference letter or number from the Analytical SOP References table (Worksheet #23).
                                                            23

-------
QAPP Worksheet #20
(UFP-QAPP Manual Section 3.1.1)
Summarize by matrix, analytical group, and concentration level
the number of field QC samples that will be collected and sent to
the laboratory.
Title:
Revision Number:
Revision Date:
Page	of	
                                                  Field Quality Control Sample Summary Table
Matrix













Analytical
Group













Concentration
Level













Analytical
and
Preparation
SOP
Reference1













No. of
Sampling
Locations2













No. of Field
Duplicate
Pairs













Inorganic
No. of MS













No. of Field
Blanks













No. of
Equip.
Blanks













No. ofPT
Samples













Total No. of
Samples to
Lab













'Specify the appropriate reference letter or number from the Analytical SOP References table (Worksheet #23).
2If samples will be collected at different depths at the same location, count each discrete sampling depth as a separate sampling location or station.
                                                                         24

-------
QAPP Worksheet #21
(UFP-QAPP Manual Section 3.1.2)
List all SOPs associated with project sampling including, but not limited to,
sample collection, sample preservation, equipment cleaning and decontamination,
equipment testing, inspection and maintenance, supply inspection and acceptance, and
sample handling and custody.  Include copies of the SOPs as attachments or reference all
in the QAPP.  Sequentially number sampling SOP references in the Reference Number column.
The reference number can be used throughout the QAPP to refer to a specific SOP.

                                              Project Sampling SOP References Table
Title:
Revision Number:
Revision Date:
Page	of	
Reference
Number







Title, Revision Date and/or Number







Originating Organization







Equipment Type







Modified for
Project Work?
(Y/N)







Comments







                                                                25

-------
QAPP Worksheet #22
(UFP-QAPP Manual Section 3.1.2.4)
Identify all field equipment and instruments (other than analytical instrumentation)
that require calibration, maintenance, testing, or inspection and provide the SOP
reference number for each type of equipment.  In addition, document the frequency
of activity, acceptance criteria, and corrective action requirements on the worksheet.
Title:
Revision Number:
Revision Date:
Page	of	
                               Field Equipment Calibration, Maintenance, Testing, and Inspection Table
Field
Equipment











Calibration
Activity











Maintenance
Activity











Testing
Activity











Inspection
Activity











Frequency











Acceptance
Criteria











Corrective
Action











Responsible
Person











SOP
Reference1











 Specify the appropriate reference letter or number from the Project Sampling SOP References table (Worksheet #21).
                                                                  26

-------
QAPP Worksheet #23
(UFP-QAPP Manual Section 3.2.1)
List all SOPs that will be used to perform on-site or off-site analysis.  Indicate
whether the procedure produces screening or definitive data.  Sequentially number
analytical SOP references in the Reference Number column.  Include copies of the
SOPs as attachments or reference in the QAPP. The reference number can be used
throughout the QAPP to refer to a specific SOP.

                                           Analytical  SOP References Table
Title:
Revision Number:
Revision Date:
Page	of	
Reference
Number






Title, Revision
Date, and/or
Number






Definitive or
Screening Data






Analytical Group






Instrument






Organization
Performing
Analysis






Modified for
Project Work?
(Y/N)






                                                          27

-------
QAPP Worksheet #24
(UFP-QAPP Manual Section 3.2.2)
Identify all analytical instrumentation that requires calibration and provide
the SOP reference number for each.  In addition, document the frequency,
acceptance criteria, and corrective action requirements on the worksheet.

                                          Analytical Instrument Calibration Table
Title:
Revision Number:
Revision Date:
Page	of	
Instrument






Calibration
Procedure






Frequency of
Calibration






Acceptance
Criteria






Corrective Action
(CA)






Person
Responsible for
CA






SOP Reference1






 Specify the appropriate reference letter or number from the Analytical SOP References table (Worksheet #23).
                                                             28

-------
QAPP Worksheet #25
(UFP-QAPP Manual Section 3.2.3)
Identify all analytical instrumentation that requires maintenance, testing, or inspection
and provide the SOP reference number for each.  In addition, document the
frequency, acceptance criteria, and corrective action requirements on the worksheet.
Title:
Revision Number:
Revision Date:
Page	of	
                     Analytical Instrument and Equipment Maintenance, Testing, and Inspection Table
Instrument/
Equipment





Maintenance
Activity





Testing
Activity





Inspection
Activity





Frequency





Acceptance
Criteria





Corrective
Action





Responsible
Person





SOP
Reference1





 Specify the appropriate reference letter or number from the Analytical SOP References table (Worksheet #23).
                                                            29

-------
QAPP Worksheet #26                                                                               Title:
(UFP-QAPP Manual Appendix A)                                                                    Revision Number:
Use this worksheet to identify components of the project-specific sample handling system.               Revision Date:
Record personnel, and their organizational affiliations, who are primarily responsible for                 Page	of	
ensuring proper handling, custody, and storage of field samples from the time of collection,
to laboratory delivery, to final sample disposal. Indicate the number of days field samples
and their extracts/digestates will be archived prior to disposal.

                                                    Sample Handling System
 SAMPLE COLLECTION, PACKAGING, AND SHIPMENT
 Sample Collection (Personnel/Organization'):
 Sample Packaging (Personnel/Organization'):
 Coordination of Shipment (Personnel/Organization):
 Type of Shipment/Carrier:
 SAMPLE RECEIPT AND ANALYSIS
 Sample Receipt (Personnel/Organization):
 Sample Custody and Storage (Personnel/Organization'):
 Sample Preparation (Personnel/Organization'):
 Sample Determinative Analysis (Personnel/Organization'):
 SAMPLE ARCHIVING
 Field Sample Storage (No. of days from sample collection):
 Sample Extract/Digestate Storage (No. of days from extraction/digestion):
 Biological Sample Storage (No. of days from sample collection):
 SAMPLE DISPOSAL
 Personnel/Organization:
 Number of Days from Analysis
                                                               30

-------
QAPP Worksheet #27                                                                    Title:
(UFP-QAPP Manual Section 3.3.3)                                                         Revision Number:
Describe the procedures that will be used to maintain sample custody and                       Revision Date:
integrity. Include examples of chain-of-custody forms, traffic reports, sample                    Page	of	
identification, custody seals, laboratory sample receipt forms, and laboratory
sample transfer forms. Attach or reference applicable SOPs.

                                              Sample Custody Requirements
 Field Sample Custody Procedures (sample collection, packaging, shipment, and delivery to laboratory):
 Laboratory Sample Custody Procedures (receipt of samples, archiving, disposal):
 Sample Identification Procedures:
 Chain-of-custody Procedures:
                                                            31

-------
QAPP Worksheet #28
(UFP-QAPP Manual Section 3.4)
Complete a separate worksheet for each sampling technique, analytical method/SOP,
matrix, analytical group, and concentration level. If method/SOP QC acceptance
limits exceed the measurement performance criteria, the data obtained may be
unusable for making project decisions.
                                                                           Title:
                                                                           Revision Number:
                                                                           Revision Date:
                                                                           Page	of	
                                                       QC Samples Table
 Matrix
 Analytical Group
 Concentration Level
 Sampling SOP
 Analytical Method/
 SOP Reference
 Sampler's Name
 Field Sampling
 Organization
 Analytical
 Organization
 No. of Sample
 Locations
 QC Sample:
Frequency/Number
 Method/SOP QC
Acceptance Limits
Corrective Action
   Person(s)
 Responsible for
Corrective Action
 Data Quality
Indicator (DQj)
Measurement Performance
       Criteria
                                                                32

-------
QAPP Worksheet #29
(UFP-QAPP Manual Section 3.5.1)
Identify the documents and records that will be generated for all aspects of the
project including, but not limited to, sample collection and field measurement,
on-site and off-site analysis, and data assessment.
                                                             Title:
                                                             Revision Number:
                                                             Revision Date:
                                                             Page	of	
                                          Project Documents and Records Table
     Sample Collection
  Documents and Records
   On-site Analysis
Documents and Records
   Off-site Analysis
Documents and Records
   Data Assessment
Documents and Records
Other
                                                            33

-------
QAPP Worksheet #30
(UFP-QAPP Manual Section 3.5.2.3)
Identify all laboratories or organizations that will provide analytical services
for the project, including on-site screening, on-site definitive, and off-site
laboratory analytical work. Group by matrix, analytical group, concentration,
and sample location or ID  number. If applicable, identify the subcontractor
laboratories and backup laboratory or organization that will be used if the
primary laboratory or organization cannot be used.

                                                 Analytical Services Table
Title:
Revision Number:
Revision Date:
Page	of	
Matrix










Analytical
Group










Concentration
Level










Sample
Locations/ID
Numbers










Analytical SOP










Data Package
Turnaround
Time










Laboratory/Organization
(Name and Address,
Contact Person and
Telephone Number)










Backup
Labo r ato ry/Organiz ation
(Name and Address,
Contact Person and
Telephone Number)










                                                             34

-------
QAPP Worksheet #31
(UFP-QAPP Manual Section 4.1.1)
Identify the type, frequency, and responsible parties of
planned assessment activities that will be performed for the project.
Title:
Revision Number:
Revision Date:
Page	of	
                                           Planned Project Assessments Table
Assessment
Type





Frequency





Internal or
External





Organization
Performing
Assessment





Person(s) Responsible
for
Performing Assessment
(Title and Organizational
Affiliation)





Person(s) Responsible
for Responding to
Assessment Findings
(Title and Organizational
Affiliation)





Person(s) Responsible
for Identifying
and Implementing
Corrective Actions (CA)
(Title and Organizational
Affiliation)





Person(s)
Responsible for
Monitoring
Effectiveness of
CA (Title and
Organizational
Affiliation)





                                                          35

-------
QAPP Worksheet #32
(UFP-QAPP Manual Section 4.1.2)
For each type of assessment describe procedures for handling
QAPP and project deviations encountered during the planned
project assessments.
Title:
Revision Number:
Revision Date:
Page	of	
                                 Assessment Findings and Corrective Action Responses
Assessment
Type








Nature of
Deficiencies
Documentation








Individual(s)
Notified of Findings
(Name, Title,
Organization)








Timeframe of
Notification








Nature of
Corrective Action
Response
Documentation








Individual(s)
Receiving Corrective
Action Response
(Name, Title, Org.)








Timeframe for
Response








                                                         36

-------
QAPP Worksheet #33
(UFP QAPP Manual Section 4.2)
Identify the frequency and type of planned QA Management
Reports, the project delivery dates, the personnel responsible
for report preparation, and the report recipients.
Title:
Revision Number:
Revision Date:
Page	of	
                                            QA Management Reports Table
Type of Report








Frequency (daily, weekly
monthly, quarterly,
annually, etc.)








Projected Delivery Date(s)








Person(s) Responsible for
Report Preparation (Title
and Organizational
Affiliation)








Report Recipient(s) (Title
and Organizational
Affiliation)








                                                          37

-------
QAPP Worksheet #34
(UFP-QAPP Manual Section 5.2.1)
Describe the processes that will be followed to verify project data.
Manual (Section 5.1). Describe how each item will be verified, when
the activity will occur, and what documentation is necessary, and identify
the person responsible.  Internal or external is in relation to the data generator.

                                            Verification (Step I) Process Table
Title:
Revision Number:
Revision Date:
Page	of	
Verification Input





Description





Internal/
External





Responsible for Verification
(Name, Organization)





                                                            38

-------
QAPP Worksheet #35
(UFP-QAPP Manual Section 5.2.2)
Describe the processes that will be followed to validate project data.
Validation inputs include items such as those listed in Table 9
of the UFP-QAPP Manual (Section 5.1). Describe how each item will be
validated, when the activity will occur, and what documentation is necessary and
identify the person responsible. Differentiate between steps Ha and lib of validation.

                                        Validation (Steps Ha and lib) Process Table
                                                                         Title:
                                                                         Revision Number:
                                                                         Revision Date:
                                                                         Page	of	
  Step Ila/IIb
Validation Input
Description
Responsible for Validation
  (Name, Organization)
                                                           39

-------
QAPP Worksheet #36
(UFP-QAPP Manual Section 5.2.2)
Identify the matrices, analytical groups, and concentration levels that each
entity performing validation will be responsible for, as well as criteria
that will be used to validate those data.
Title:
Revision Number:
Revision Date:
Page	of	
                                      Validation (Steps Ha and lib) Summary Table
Step Ila/IIb






Matrix






Analytical Group






Concentration
Level






Validation Criteria






Data Validator (title
and organizational
affiliation)






                                                           40

-------
QAPP Worksheet #37                                                                     Title:
(UFP-QAPP Manual Section 5.2.3)                                                          Revision Number:
Describe the procedures/methods/activities that will be used to                                 Revision Date:
determine whether data are of the right type, quality, and quantity                              Page	of	
to support environmental decision-making for the project. Describe
how data quality issues will be addressed and how limitations on the
use of the data will be handled.

                                                    Usability Assessment
 Summarize the usability assessment process and all procedures, including interim steps and any statistics, equations, and computer
 algorithms that will be used:
 Describe the evaluative procedures used to assess overall measurement error associated with the project:
 Identify the personnel responsible for performing the usability assessment:
 Describe the documentation that will be generated during usability assessment and how usability assessment results will be presented
 so that they identify trends, relationships (correlations), and anomalies:
                                                             41

-------