EPA 910-B-00-001
 Region 8  Region 9     Region 10
 Denver, CO San Francisco, CA  Seattle, WA
                            August 2000
      ABANDONED MINE SITE
      CHARACTERIZATION and
      CLEANUP HANDBOOK
                  -
- '
                          ^
                   "^ - • - * . "
                 . . - •   _ - -

-------
              UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                              REGION 10
                            1200 Sixth Avenue
                            Seattle, WA 98101
Reply To
Attn Of:    ECL-117
Handbook Users:

The Abandoned Mine Site Characterization and Cleanup Handbook
(Handbook) is the result of the collective efforts and contributions of a
number of individuals. During the earliest days of Handbook development,
Mike Bishop of EPA Region 8 lead the effort to develop a Superfund Mine
Waste Reference Document for EPA project managers working on mine
site cleanup.  That effort evolved into the Handbook in recognition of the
many regulatory and non-regulatory mechanisms that are used today to
manage the characterization and cleanup of mines sites.

Users are encouraged  to consider the information presented in the
Handbook against the backdrop of site specific environmental and
regulatory factors. The Handbook has been developed as a source of
information and ideas for project managers involved in the characterization
and cleanup of inactive mine sites. It is not guidance  or policy.

The list that follows acknowledges the efforts of writers, reviewers,  editors,
and other contributors that made development of the Handbook possible. It
is always a bit risky to develop a list of contributors because it is inevitable
that someone gets left out; to those we have neglected to acknowledge
here we apologize.

Nick Ceto
Regional Mining Coordinator
EPA Region 10
Seattle, Washington

Shahid Mahmud
OSWER
EPAHQ
Washington,  D.C.
                                                             Printed on Recycled Paper

-------
Abandoned Mine Site Characterization and Cleanup Handbook Contributors
Fred Macmillan
Brad Bradley
Shawn Ghose
Mark Doolan
Mike Bishop
Matt Cohn
Carol Russ
Jim Dunn
Elisabeth Evans
Holly Fliniau
Eva Hoffman
Victor Kettelapper
Sonya Pennock
Mike Holmes
Andy Lensink
Ken Wangerud
Sara Weinstock
Chris Weis
Patti Collins
Ken Green berg
Mike Hingerty
Nick Ceto
Bruce  Duncan
Earl Liverman
Roseanne Lorenzana
Patty McGrath
Don Metheny
Michelle Pirzadeh
Judy Schwarz
Sean Sheldrake
Bill Riley
Dave Tomten
Shahid Mahmud
Joe Tieger
Steve Hoffman
David Cooper
Steve Ells
Mike Goldstein
Sheila Igoe
Leslie  Leahy
Andrea Mclaughlin
Tom Sheckells
Gary Lynch
Dave Norman
EPA Region III
EPA Region V
EPA Region VI
EPA Region VII
EPA Region VIM
EPA Region VIM
EPA Region VIM
EPA Region VIM
EPA Region VIM
EPA Region VIM
EPA Region VIM
EPA Region VIM
EPA Region VIM
EPA Region VIM
EPA Region VIM
EPA Region VIM
EPA Region VIM
EPA Region VIM
EPA Region IX
EPA Region IX
EPA Region IX
EPA Region X
EPA Region X
EPA Region X
EPA Region X
EPA Region X
EPA Region X
EPA Region X
EPA Region X
EPA Region X
EPA Region X
EPA Region X
EPA OERR
EPA OSRE
EPA OSW
EPA OERR
EPA OERR
EPA OERR
EPA OGC
EPA OERR
EPA OERR
EPA OERR
State of Oregon
State of Washington

-------
                               Table of Contents
Chapter 1 Introduction

       1.1 Introduction	1-1
       1.2 Contents of Handbook	1-2
Chapter 2 Overview of Mining and Mineral Processing Operations

      2. 1  Introduction	2-1
      2. 2  Mining 	2-1
             2. 2. 1 Types of Mining Processes  	2-2
             2. 2. 2 Mining Wastes and Hazardous Materials	2-3
      2. 3  Beneficiation:  Milling 	2-5
             2. 3. 1 Types of Beneficiation (Milling) Processes	2-5
             2. 3. 2 Beneficiation (Milling) Wastes and Hazardous Materials 	2-7
      2. 4  Beneficiation:  Leaching	2-9
             2. 4. 1 Types of Processes Associated with Leaching	2-9
             2. 4. 2 Leaching Wastes and Hazardous Materials 	2-12
      2. 5  Mineral Processing 	2-12
             2. 5. 1 Types of Mineral Processing Operations 	2-13
             2. 5. 2 Types of Mineral Processing Wastes and Hazardous Materials .... 2-14
      2. 6  Additional Sources of Information  	2-16
Chapter 3  Environmental Impacts from Mining

       3.1  Introduction	3-1
       3.2  Acid Drainage	3-1
       3.3  Metal Contamination of Ground and Surface Water, and Associated Sediments 3-3
       3.4  Sedimentation of Surface Waters	3-5
       3.5  Cyanide 	3-6
       3.6  Air Emission and Downwind Deposition 	3-8
       3.7  Physical Impacts from Mine and Waste Management Units	3-9
       3.8  Sources of Additional Information	3-11
Chapter 4  Setting Goals and Measuring Success

       4.1  Introduction	4-1
       4.2  National and Regional Goals 	4-1
       4.3  State and Local Goals  	4-2
             4.3.1 Human Health Impacts	4-2
             4.3.2 Environmental Impacts	4-3
             4.3.3 Getting it Done 	4-3
             4.3.4 Values and Choices 	4-4
       4.4  Measuring Success  	4-4
       4.5 Sources of Additional Information  	4-5

-------
ii Table of Conten ts
Chapter 5  Community Involvement at Mining Waste Sites

       5.1  Introduction	5-1
       5.2  Considerations for Community Involvement at Mine Waste Sites	5-1
             5.2.1 Community Values and Culture	5-1
       5.3  Risk Perception 	5-3
       5.4  Liability	5-4
       5.5  Economic Impacts 	5-5
       5.6  Fiscal Impacts on Local Government	5-6
       5.7  Federal Land Managers	5-7
       5.8  Uncertainty  	5-7
       5.9 Additional Sources of Information 	5-8
Chapter 6  Scoping Studies of Mining and Mineral Processing Impact Areas

       6.1  Introduction	6-1
       6.2  Scoping 	6-1
       6.3  Difficulties  in Scoping Abandoned Mine Sites	6-3
       6.4  Scoping Issues Associated with Mining and Mineral Processing Sites	6-4
             6.4.1 Operable Units 	6-4
             6.4.2 Interim Actions	6-6
             6.4.3 Unusual Requirements	6-6
       6.5 Sources of  Additional Information 	6-7
Chapter 7  Sampling & Analysis of Impacted Areas

       7.1  Introduction	7-1
       7.2  Sampling and Analysis	7-1
       7.3  Issues for Sampling at Mining and Mineral Processing Sites 	7-2
             7.3.1  Defining Analytical Data Needs 	7-2
             7.3.2  Understanding Pre-Mining Conditions	7-2
             7.3.3  The Importance of Site Characterization  	7-4
             7.3.4  Calculating  Preliminary Remediation Goals	7-4
             7.3.5  Selecting a Qualified Analytical Laboratory  	7-5
             7.3.6. Determining the Leachability of Contaminants	7-5
             7.3.7  Selecting Analytical Methods	7-6
Chapters  Scoping and Conducting Ecological and Human Health Risk Assessments At
Superfund Mine Waste Sites

       8.1  Introduction	8-1
       8.2  Supporting Guidance Documents	8-1
       8.3  Overview of Mine Waste Site Risk Assessment Features  	8-2
             8.3.1 Site Characteristics 	8-2
             8.3.2 Comprehensive Risk Assessment Considerations	8-3
       8.4  Ecological Risk Assessment	8-4
             8.4.1 Identification of Potential Chemical and Physical Stressors	8-5
             8.4.2 Problem Formulation	8-5
             8.4.3 Characterization of Ecological Effects 	8-6

-------
                                                                   Table of Contents iii
Chapters Scoping and Conducting Ecological and Human Health Risk Assessments At
Superfund Mine Waste Sites (continued)
       8.5  Human Health Risk Assessment  	8-7
             8.5.1  Contaminants of Potential Concern  	8-7
             8.5.2  Exposure Assessment	8-9
             8.5.3  Toxicity Assessment 	8-10
             8.5.4  Health Studies	8-10
       8.6  Probabilistic Analysis  	8-11
       8.7  Risk Characterization	8-11
       8.8  Risk Communication	8-12
       8.9  Removal Actions	8-12
             8.9.1  Health Effects  	8-12
             8.9.2  Risk Management Considerations	8-13
       8.10 Sources of Additional Information  	8-13
Chapter 9  Site Management Strategies

       9.1  Introduction	9-1
       9.2  Managing for Risk Reduction 	9-1
       9.3  Categories of Activities that Address Risk Elements	9-2
       9.4  Time-Based Responses	9-3
             9.4.1 Time-Critical Actions	9-4
             9.4.2 Interim Responses  	9-5
             9.4.3 Long-Term Responses	9-7
       9.5  Strategic Planning Considerations 	9-8
             9.5.1 ARARs  	9-8
             9.5.2  State and Other Agencies 	9-9
             9.5.3  Brownfield Initiative 	9-10
             9.5.4 Enforcement Considerations	9-10
       9.6. Additional Sources of Information 	9-11
Chapter 10  Remediation and Cleanup Options

       10.1  Introduction	10-1
       10.2 Background	10-1
       10.3 Conventional Technologies	10-3
             10.3.1  Treatment Technologies 	10-3
             10.3.2 Collection, Diversion, and Containment Technologies 	10-5
             10.3.3 Reuse, Recycle, Reclaim 	10-9
       10.4 Innovative/Emerging Technologies 	10-9
       10.5 Institutional Controls  	  10.10
       10.6 Sources of Information and Means of Accessing Information
              Regarding Available Technologies  	10-12

-------
iv Table of Co ntents
Chapter 11  The Regulatory "Toolbox"

       11.1  Introduction	11-1
       11.2  Background  	11-1
       11.3  CERCLA Jurisdiction/Applicability	11-2
             11.3.1  Jurisdictional Conditions	11-2
             11.3.2  Media	11-2
             11.3.3  Constituents	11-2
       11.4  Implementation Mechanisms	11-2
             11.4.1  Permits	11-2
             11.4.2  Review/Approval  	11-3
             11.4.3  Response Authorities	11-3
             11.4.4  Standard Setting  	11-4
             11.4.5  Applicable or Relevant and Appropriate Requirements	11-4
       11.5  Compliance/Enforcement	11-5
             11.5.1  Administrative and Injunctive Authorities 	 11-5
             11.5.2  Cost Recovery	 11-5
             11.5.3  Civil Penalties	 11-6
             11.5.4  Criminal Penalties 	11-6
             11.5.5  Information Collection  	11-6
       11.6  Other Superfund "Tools"	 11-7
             11.6.1  Funding 	11-7
             11.6.2  Natural  Resource Damage Provisions	 11-7
             11.6.3  Good Samaritan Provisions	11-7
             11.6.4  Native American Tribes 	11-8
       11.7  Limitations 	11-8
             11.7.1  Federally  Permitted Release 	11-8
             11.7.2 Pollutants and Contaminants	11-8
       11.8  Ability to Integrate with Other Statutes	11-8
       11.9  Federal  Facilities and Other Federal Issues	11-9
       11.10 Other Regulatory Tools	11.10
             11.10.1  Clean  Water Act	11-10
             11.10.2  Resource Conservation and Recovery Act	11-10
             11.10.3  Toxic Substances Control Act  	 11-11
             11.10.4  Miscellaneous Requirements	11-11
       11.11 Non-Regulatory Tools  	 11-12
             11.11.1 Key Characteristics of Non-Regulatory Tools  	11-13
                    11.11.1.1  Financial	11-13
                    11.11.1.2  Institutional	11-13
                    11.11.1.3 Technical  	11-14
             11.11.2 Other Characteristics  	11-14
             11.11.3 Limits  	 11-15

-------
                                                                  Table of Contents v
                                  APPENDICES


Appendix A:   Acronym List and Glossary of Mining Terms

Appendix B:   Acid Mine Drainage

Appendix C:   Mining Sites on the NPL

Appendix D:   General Discussion of Applicable or Relevant and
             Appropriate Requirements at Superfund Mining Sites

Appendix E:   X-Ray Florescence

Appendix F:   Risk Assessment Scoping,  Problem Formulation, and Additional
             Risk Assessment Guidance

Appendix G:   Detailed Information on Mine Remediation Technologies

Appendix H:   Innovative Technologies

Appendix I:    EPA Mining Contacts

Appendix J:   Internet Resources

Appendix K:   Land Disposal Restrictions  Overview and Bibliography

Appendix L:   Mine Waste Technology Program

Appendix M:   Remediation  References

-------
vi Table of Co ntents
                                Disclaimer

Mention of trade names or company products does not constitute endorsement or
recommendation for use by the U.S. Government or by the Environmental Protection
Agency.

-------
                                     Chapter 1
                                   Introduction
                                        NOTICE

This document provides a reference resource to EPA and other staff addressing characterization
and cleanup of abandoned mine sites. The document does not, however, substitute for EPA
statutes, regulations and guidance, nor is it a regulation itself.  Thus it cannot impose legally-
binding requirements on EPA, States, or the regulated community, and may not apply to a
particular situation based on the circumstances.  EPA may change this reference document in
the future, as appropriate.

1.1   Introduction

The Abandoned Mine Site Characterization and Cleanup Handbook (Handbook) has been
developed by the Environmental Protection Agency as a resource for project managers working
on addressing the environmental concerns posed by inactive mines and mineral processing
sites.  The information contained in the Handbook is not policy or guidance, rather it a
compendium of information gained during many years of experience on mine site cleanup
projects. This information was developed primarily for EPA staff, but may also prove useful to
others working on mine site characterization and cleanup projects, including: states, other federal
agencies, tribes, local government, public interest groups, and private industry. Handbook users
are encouraged to refer to appropriate agency guidance and/or policy during development of site
specific mine site investigation and cleanup projects.

Earlier drafts of this document focused on the tools available for mine site cleanup under the
authorities of the Comprehensive Environmental Response, Compensation, and Liability Act
(CERCLA).  However, with the recent release of EPA's  National Hardrock Mining Framework, the
agency has stated its preference that a broad range of  regulatory and non-regulatory tools be
considered in implementing inactive mine site cleanup projects. Consistent with the recognition
of the need fora more flexible approach, the title Superfund Mine Waste Reference Document,
has been replaced.

This handbook focuses on environmental  hazards at abandoned mining sites.  At many sites,
however, physical hazards (e.g., open shafts or adits, unstable buildings, unstable slopes, etc.)
present a safety hazard to the investigators and/or general public.  These safety hazards also
deserve careful consideration in developing site management strategies but are not considered
in this document.

EPA's National Hardrock Mining Framework emphasizes the need for developing partnerships in
addressing the environmental concerns posed by inactive mines.  This manual reflects the same
philosophy.  Effective partnerships will assist in dealing with the difficult issues often posed by
mine sites, including: extensive areas of contamination, complex land ownership patterns, liability
issues, overlapping jurisdictions, and long term management considerations. Often in evaluating
cleanup options at mine sites, a watershed approach to assessing environmental impacts will  be
required to understand the scope of potential problems and design appropriate solutions.
Partnerships can facilitate the design of cleanup strategies that address multiple interests within
a watershed. Collaborative efforts to set priorities for mine site cleanup, coupled with utilization
of the appropriate mix of regulatory and non-regulatory tools for getting the work done, should
result in successful projects.
Because this handbook was originally written for use by CERCLA program staff there are

-------
1-2 Chapter 1: Introduction
frequent references to guidance or other references developed under the auspices of Superfund.
This does not suggest that CERCLA authorities are to be applied at each abandoned mine site.
Rather, these references are provided to the reader as resources to be considered in developing
site characterization and cleanup strategies under whatever regulatory or non-regulatory
approach that is appropriate at a particular site.  Experience has demonstrated that the
conceptual framework utilized in the CERCLA process is effective in investigating environmental
concerns and identifying appropriate cleanup actions; however users of this Handbook are
encouraged to consider the information provided here in the context of site specific
considerations.

1.2    Contents of Handbook

The Abandoned Mine Site Impact Characterization and Cleanup Handbook is divided into several
chapters, each dealing with an issue that is important in either site investigation, cleanup, or
long-term  management.

Chapter 1: Introduction, this chapter, introduces the Handbook to readers.

Chapter 2: Overview of Mining and Mineral Processing Operations introduces users to the
types of operations, related wastes, and waste management practices typical of mine sites and
mineral processing facilities.  Knowledge of the historical operations that took place on the site
will aid the project manager during site scoping, site characterization, and the cleanup alternative
selection process.

Chapter 3: Environmental Impacts from Mining introduces site managers to the types of
impacts abandoned mining operations can have on the environment. Knowledge of these
impacts will be important during site scoping, characterization, and cleanup alternative selection.
This background information  provides  valuable insight into the contaminants  that maybe
present, potential threats to human health and the  environment, and feasibility of response
actions.

Chapter 4: Setting Goals and Measuring Success outlines considerations in setting goals for
mine site cleanup and in assessing the success of mine site cleanup initiatives.  The  chapter
covers the coordination  among federal and state agencies in determining the goals that  need to
be met and resolving  conflicts between different goals in different agencies.  The chapter further
discusses how a site manager can "measure" the success of meeting the goals that were set for
the site.

Chapter 5: Community Involvement at Mining Waste Sites provides information regarding
community involvement planning for site investigation and cleanup work at mining waste sites.
Community involvement planning should parallel all aspects of the site cleanup process  from the
onset of scoping to conclusion of site work. While the relevant public participation requirements
of the statutes under which the cleanup is taking place must be met, these activities represent
only a starting point for  community involvement at many sites. Additional guidance on Superfund
community involvement requirements and other community involvement activities can be found in
Superfund Community Involvement Handbook & Toolkit.

Chapter 6: Scoping Studies of Mining and Mineral Processing Impact Areas provides an
overview of the scoping process at abandoned mining and mineral processing sites. The first
section  of the chapter presents background information on the scoping  process in general. The
individual tasks associated with the scoping process can be found in Chapter 2 of the Guidance
for Conducting Remedial Investigations and Feasibility Studies Under CERCLA.  The remainder
of the chapter addresses the problems and issues the site manager should consider when
scoping an abandoned  mining or mineral processing site.

-------
                                                              Chapter 1: Introdu ction 1 -3
Chapter 7: Sampling and Analysis of Impacted Areas outlines concepts and issues related to
designing and implementing a sampling and analysis program for characterizing mining and
mineral processing site waste management areas. The chapter presents general information
about the sampling and analysis process. The individual tasks associated with sampling and
analysis can be found in Chapters 3 and 4 of the Guidance for Conducting Remedial
Investigatbns and Feasibility Studies Under CERCLA. Mining and mineral processing sites
present many problems and issues that are not characteristic of other sites. The chapter
presents unique characteristics  of mining and mineral processing sites and briefly discuss how
these characteristics can affect  the sampling  and analysis program. The remainder of the
chapter addresses  issues associated with sampling and analysis at abandoned mining and
mineral processing sites.

Chapter 8: Scoping and Conducting Ecological and Human Health Risk Assessments at
Superfund Mine Waste Sites discusses environmental and human health considerations in risk
assessment development. While not all  mine sites will require that a risk assessment be
completed, the process to determine risk will  be similar to the CERCLA process that is presented
here.  The chapter  highlights some of the unique issues related to risk assessments at mine
waste sites and provides some guidance to help address these issues. This chapter furnishes
Remedial Project Managers (RPMs), Site Assessment Managers (SAMs), Removal Managers,
and other federal and state authorities with a summary of key issues relevant to mine  waste site
risk assessments as well as a compilation of references to other helpful resources.

Chapter 9: Site Management Strategies discusses options that a site manager may consider
for managing risk at abandoned mining and mineral  processing sites.  The site manager can be
a state, federal, tribal or local authority,  or private landowner and be managing the site under a
number of regulatory or non-regulatory programs. The characterization of the site and the risk
assessment are used to identify the risks at the site.  While these risks can be both
environmental or physical, this discussion will focus on the environmental risk. As with any
remediation project, strategic planning is critical in abandoned mine characterization initiatives as
well as clean-up activities.

Chapter 10: Remediation and  Cleanup Options identifies remediation and cleanup  options to
be considered in designing and  implementing inactive mine site cleanup projects. The chapter
will assist the user with a basic understanding of the types and availability of cleanup
technologies for typical mining and mineral processing sites.

This chapter consists of three general sections. The first discusses technologies with
demonstrated effectiveness at mine sites. The second section focuses on emerging or
innovative technologies.  The third section addresses institutional controls. Finally the last
section identifies sources of information regarding available technologies and means of
accessing this information

Chapter 11: The Regulatory "Toolbox" discusses  the tools available to project managers in
developing strategies for an abandoned  mine site cleanup. Regulation of mining activities occurs
via a complex web  of sometimes overlapping jurisdictions, laws, and regulations covering several
environmental media. Land ownership and tenancy issues further complicate regulatory
considerations.  Each abandoned  mine site faces a somewhat unique set of regulatory
requirements, depending on statute or regulation; whether it is on State, Federal, Tribal, or
private land; local regulations; and the specific environmental considerations unique to the site.

-------
1-4 Chapter 1: Introduction
The chapter begins with a general discussion of the use of CERCLA for remediating mining and
mineral processing sites, then discusses applicability; implementation; enforcement; other
Superfund tools; limitations; ability to interact with other statutes, and interaction with federal
facilities. Finally, this chapter will discuss tools other than CERCLA that may be used at mining
sites, including non-regulatory programs and initiatives.

The appendices provide additional information and references of selected topics.

Users of the Handbook are reminded that mine site cleanup projects are conducted against a
complex backdrop of federal, state, tribal, and local regulations and policies.  These often
change. Similarly, considerable effort is now being devoted to developing more cost effective
cleanup technologies for inactive mine sites.  Therefore, readers are advised to refer to sources
listed in the references in conjunction with using this manual to be certain to have the most up to
date information available in designing site characterization and cleanup projects.  Other sources
of information are Internet web pages, including those that can  be reached through the EPA
home page at  http://www.epa.gov.

-------
                                     Chapter 2
       Overview of Mining and  Mineral Processing Operations
2. 1    Introduction

This chapter introduces users to the types of operations, waste streams, and waste
management practices typical of historic mine sites and mineral processing facilities.
Knowledge of the operating history of the site will be valuable during site scoping, site
characterization, and the cleanup alternative selection process. In addition, this knowledge will
assist in locating potential physical hazards, such as mine openings that may have become
obscured. Knowledge of the wastes and waste management practices will provide additional
insight into the potential threats to human health and the environment, as well as feasibility of
response actions.

The production  of minerals for economic use involves a series of physical and chemical
processes. These may occur at any time from  excavation of the ore that contains the metal in
mineral form through production of the metal in marketable form. Users should be aware that
mining terms have not been used consistently  over the years.  This can complicate the process
of identifying site histories and operations. Some particularly noteworthy instances where this
can occur are explained in the text.

The chapter is divided into sections addressing Mining (or "extraction"), Beneficiation (e. g. ,
milling and leaching), and Mineral Processing (e.g., smelting and refining). Each section in this
chapter begins with  a discussion of processes followed by a discussion of wastes generated.  It
is worthwhile to note that the three types of operations may or may not be co-located.  For
example, in many mining districts, the beneficiation plant is located at a central location to serve
a number of individual mines with the concentrate being further transported to a remote
smelter.  In contrast, other sites,  such  as Bunker Hill in Northern Idaho, had  the mine,
concentrator, and smelter all located together.  When mineral processing operations are co-
located with extraction and beneficiation operations, comingling of relatively small quantities of
mineral processing waste with beneficiation waste often has occurred. This is important due to
the physical characteristics of the waste , as well as the applicable waste  management
regulations.

The definition of a mine site may be broad. EPA, in its Clean Water Act effluent limitation
guidelines for discharges from mines, has defined a mine as an area of land  upon or under
which minerals  or metal ores are extracted from natural deposits in the earth by any methods,
including the total area upon which such activities occur or where such activities disturb the
natural land surface. A mine, underthis definition, also includes land affected by ancillary
operations that  disturb the natural land surface, and can include adjacent land whose use is
more incidental to mining activities (e. g. ,  roads, workings, impoundments, dams, ventilation
shafts, drainage tunnels, refuse banks, dumps, stockpiles, overburden piles,  spoil banks,
tailings, holes or depressions, structures, or facilities).
2.2   Mining

The initial step of the mining and mineral processing operations is the actual removal of the
mineral value in ore from the host rock or matrix Minerals may be extracted from the earth
using a variety of techniques (note that the term extraction also may be used within the industry
to describe pyrometallurgical and metallurgical processes-that is outside this mining definition).
Most extraction processes result in the removal of ore and associated rock or matrix in bulk

-------
2-2 Chapter 2: Overview of Mining and Mineral Processing Operations	

form from the deposit, using blasting and various mechanical means to break the ore into
pieces of manageable size or to separate the ore minerals from unwanted material.

In the interest of economic efficiency, the extraction process is designed to remove ore of a
predetermined grade or higher, leaving behind as much of the lower grade ore and barren rock
as possible. Because this ideal separation is not always possible in practice, some lower grade
rock is mined while some higher grade ore is left behind. It is important to note that the term
"ore" is an economic one. In general, ore is earthen material that contains  minerals of sufficient
value to be extracted economically.  Because the value of a mineral can change rapidly and
substantially, the distinction between "ore" and other mined materials (which generally contain
mined  values that cannot be economically extracted at the time) is also variable, both from
mine to mine and, for any specific mine, over time.

2. 2. 1  Types of Mining Processes

Mining can be categorized as surface mining, underground mining, and in situ mining. Surface
mining is used to excavate ores at or close to the earth's surface; included  in surface mining
are open pit mining, highwall or strip mining used to excavate coal or other deposits
(abandoned coal mines are not addressed  in this handbook), and dredging to excavate placer
deposits.  Underground and in situ mining both remove minerals from deeper deposits, the
former by extracting under the surface and removing the ore and the latter by sinking injection,
and extraction wells and leaching the ore in place.

Open Pit Mining. Surface  mining with open pits has become the  primary type of mining
operation for most of the major metallic ores in the United States.  It is the method of choice
when the characteristics of the ore deposit (e. g. grade, size, location) make removing
overburden (i. e. , host rock overlying the mineral laden ore) cost effective. At present, this is
the most economical way of mining highly disseminated (i. e. , lower-grade) ores. Open pit
mining involves excavation of an  area of overburden and removal of the ore exposed in the
resulting pit. Depending on the thickness of the orebody, it may be removed as a single vertical
interval or in successive intervals or benches. With the larger orebodies common to metals
mining, the orebody typically is mined in benches either by drilling vertical  holes from the top  of
the bench and blasting the ore onto the adjacent lower level or, in  less resistant materials, by
excavating with digging/scraping machinery without the use of explosives.

Explosives typically used in open pit mining are comprised of chemicals which, when combined,
contain all the requirements for complete combustion without oxygen supply. Early explosives
consisted chiefly of nitroglycerine, carbonaceous material and an oxidizing  agent. These
mixtures were packaged into cartridges for convenience in handling and loading into drill holes.
In recent years, fertilizer-grade ammonium nitrate mixed with about six percent fuel oil was
recognized as an explosive capable of being detonated with a high explosive primer.  This
application has spread to the point where virtually all open-pit mines use this mixture (called
ANFO) for primary blasting.

Dredging. Dredging is another method of surface mining that has been used to mine placer
deposits, which are concentrations of heavy metallic minerals that occur in sedimentary
deposits associated with current or ancient watercourses. In some mining districts, widespread
stream disturbance by placer mining or dredging may be present alongside the  other
disturbances from underground mining, beneficiation,  and/or mineral processing. Commercial
dredging has not been widely practiced in the United States in the 1990's, although placer
mining is still an important industry in Alaska. Some abandoned large-scale dredge operations
remain in the western United States, and in some cases the dredges are still present in the
dredge ponds created as part of the operation.

-------
	Chapter 2: Overview of Mining and Mineral Processing Operations 2-3

Underground Mining.  Underground mining has been the major method for the production of
certain metals but in recent years has been increasingly less common in the United States.
The mid-1990's have seen a mild resurgence of underground mining as the depths of several
major open pit mines have reached their economic limit.  Underground mining typically has
significantly less impact on the surface environment than do surface methods. This is primarily
the result of reduced surface disturbance (i.e., a smaller facility "footprint") and the much lower
quantities of non-ore materials that must be removed and disposed as waste.  Large
underground workings, when abandoned, have sometimes caused subsidence or caving at the
surface, resulting in disturbance to structures, roads, and surface water drainages. In addition,
drainage from underground mines may cause significant alteration to the quality of ground
water and can affect surface water as well.  Mine drainage water quality is highly dependent on
the characteristics of host rock and can vary widely.

In Situ Solution Mining. In situ mining is a method of extracting minerals from an orebody
that is left in place rather than being broken up and removed.  (Ex situ leaching operations,
discussed as beneficiation in Section 2. 4, operate on the same principal but with excavated
ore.)  In general, a series of wells are drilled  into the  orebody and a solvent circulated through
the formation by injection through certain wells and withdrawal through others. Although in situ
solution mining is not commonly used, it has been applied to uranium and copper deposits in
suitable hydrogeologic settings.  Although there is little disturbance of the surface and
underground at an in situ operation, the effect of the operation on the groundwater quality can
be significant as the chemistry of the ground water must be drastically altered  by the introduced
solvents and the pumping operation.  Furthermore, other materials in addition  to the target
minerals may be dissolved with the potential for affecting the local ground water, and,
depending on their mobility, surrounding areas.

Surface operations include management of barren solution (i.e., leachate prior to injection) and
pregnant leachate (leachate withdrawn and containing  the mineral value) in surface
impoundments or, more  recently, tanks.

2. 2. 2 Mining Wastes and Hazardous Materials

The largest quantity of wastes generated by extraction operations are mine water and waste
rock.  A third waste material, overburden, is generated at surface mines. Note that the use of
the terms "mining waste" and "waste management unit" in this document do not imply that all
the materials  in question are solid wastes as defined by the Resource Conservation and
Recovery Act (RCRA). Wastes from extraction and beneficiation continue to be excluded
broadly from regulation as hazardous waste, although they are regarded as solid waste;
overburden, as noted below, has an additional exclusion.

Overburden.  Overburden is the surface material (i.e., topsoil  and rock) removed during
surface mining operations to expose the ore beneath.  In recent years, mine management
plans required by States and by Federal land management agencies require that topsoil  be
salvaged and stockpiled  for use in reclamation during closure or decommissioning.
Overburden is specifically exempted from being regulated as a RCRA hazardous waste when it
is "returned to the mine site" (40 CFR 26I. 4(b)(3)).

Mine Water.  Water entering a surface or underground mine is referred to as mine water.
Sources of this water are groundwater seepage, surface water inflow, or direct precipitation. In
the absence of a natural  or manmade drainage, active mine operations below  the water table
must pump out mine water to access the orebody. Depending on the hydrogeology of the mine
this can be accomplished as simply pumping the water from the mine to grouting the rock in the
mine to prevent inflow to using a series of extraction  wells around a mine to create a cone of

-------
2-4 Chapter 2: Overview of Mining and Mineral Processing Operations	

depression in the ground water table, thereby reducing infiltration.  At some mines enormous
quantities may have to be pumped continuously from the mine during operations. Active mines
may use mine water for dust control and as process water in the mill circuit; otherwise they
typically discharge the flow to surface water under a National Pollutant Discharge Elimination
System (NPDES) permit or similar state permit.  Mine water discharge from operating mines is
typically regulated and often does not have the residence time in the ore or mine needed to
create highly acidic waters or waters highly-loaded with dissolved metals.  However, the need
to treat mine water prior to discharge is highly site specific.

When a mine closes, dewatering the mine generally ceases.  Underground mines often fill;
mine water may be released through openings such as adits, or through fractures and fissures
that  reach the surface.  If present, man-made gravity drains will continue to flow. Surface
mines that extend below the water table will return to that level when pumping ceases, either
forming a lake in the pit or inundating and saturating fill material.  Recovery of ground water to
or near pre-mining levels following the  cessation of pumping can take substantial amounts of
time, however, and the effects resulting from ground water drawdown may continue to be felt
for decades.

Water from abandoned mines may contain significant concentrations of heavy metals and total
dissolved solids and may have elevated temperatures and altered pH, depending on the  nature
of the orebody and local geochemical conditions. These waters may become acidic over time
when exposed to oxygen and, if present, pyrites or other sulfide minerals.  The acidic water
may also solubilize metals contained in the mine and mined materials, creating high
concentrations of metals in solution.  These acidic metal-laden waters may contaminate down-
gradient ground-water and surface water resources. Neutral and alkaline mine waters may also
contain metals in excess of water quality standards and be of significant concern to human
health and the environment.

Waste Rock. Waste rock consists of non-mineralized and low-grade mineralized rock removed
from, around, or within the orebody during extraction activities.  The cutoff grade that
differentiates low-grade waste rock from useable ore is an economic distinction  and may vary
over time (see above).  Therefore, what may have been disposed as waste rock (or stored as
"sub-ore", "proto-ore" or "low grade ore") in the past may be ore at another time.

Waste rock includes granular, broken rock and soils ranging in  size from fine sand  to large
boulders, with the content of fine material largely dependent on the nature of the formation and
the extraction methods employed during mining. Waste rock is typically disposed in large piles
or dumps adjacent to and/or down-slope of the point of extraction; waste rock frequently  can be
seen in close proximity to old mine shafts and openings. These sites historically were in
locations of natural drainage;  surface water run-on and infiltration have caused natural
leaching from the waste rock piles. Waste rock has often been used on the mine site for fill,
tailings dams, or other construction purposes.  Current operations frequently use engineering
controls to prevent run-on (e. g. , diversion systems) or run-off (drainage systems installed
during construction);  retrofitting waste rock sites at abandoned mines with surface water
controls is often necessary for controlling waste rock impacts at abandoned mines.

Waste rock geochemistry varies widely from mine to mine and may vary significantly at
individual mines over time as differing lithologic strata are exposed and geochemical processes
alter characteristics of the waste. Waste rock at metal mines will contain some concentration of
the target mineral along with other metals.  The mobility of any particular constituent of waste
rock is highly dependent on site specific conditions, such as climate, hydrology, geochemistry
of the disposal unit and its foundation,  mineralogy, and particle size. Waste rock from metal
mines often contains sulfitic materials as components of the host rock.  The concentration of

-------
	Chapter 2: Overview of Mining and Mineral Processing Operations 2-5

sulfide minerals and of neutralizing minerals is an important factor in the potential for waste
rock to generate acid drainage.

If prone to acid generation, such uses can lead to concern about widespread contamination,
acid generation, or other long-term problems.  Site scoping  activities often includes identifying
and mapping locations where these uses occurred.
2. 3   Beneficiation: Milling

Following the initial mining step, ore is reduced in size by the crushing and/or grinding drcuit,
and the target mineral is concentrated by various methods.  These widely varying concentration
processes are collectively referred to as beneficiation. Ore dressing and milling typically refer
to a specific subset of operations  under beneficiation and are the focus of this section.
Leaching, also considered by EPA (under the RCRA program) to be beneficiation, is discussed
separately in Section 2.  4.

In general, the criteria established by EPA (underthe RCRA program) describe beneficiation as
activities that serve to separate and  concentrate the mineral values  from waste material,
remove impurities, or  prepare the  ores for further refinement. Beneficiation activities generally
do not change the mineral values  themselves other than by reducing (e. g.  , crushing or
grinding) or enlarging (e. g., pelletizing or briquetting) particle size to facilitate processing.
Generally, no chemical changes occur in the mineral value during beneficiation. (Beneficiation
operations may be referred to as "processing" in the older literature and occasionally by
industry today.)

2. 3. 1 Types of Beneficiation (Milling) Processes

Most ores contain  the valuable metals disseminated in a matrix of less valuable rock called
gangue. The purpose of ore beneficiation is the separation of valuable minerals from the
gangue to yield a product that has a much higher content of the valued material.  Beneficiation
milling operations are functionally  categorized as either comminution, in which the mined ore is
crushed and ground to physically  liberate the target mineral, or concentration. Concentration is
the separation of the mineral values liberated by comminution from  the rest of the ore.  These
separation steps, often conducted in series, utilize the physical differences  between the
valuable mineral and the host rock to achieve separation and produce a concentrate containing
the valuable minerals and a tailing containing the waste material and reagents.  Many physical
properties, including the following, are used as the basis for separating valuable minerals from
gangue: specific gravity, conductivity, magnetic permeability, affinity for certain chemicals, and
solubility in a leachate (leaching is discussed in Section 2. 4).  Types of processes that affect
separation include gravity concentration, magnetic separation, electrostatic separation, and
flotation.

Gravity Concentration. Gravity-concentration processes exploit differences in density to
separate ore minerals from gangue.  Selection of a particular gravity-based process for a given
ore will be strongly influenced by the size to which the ore must be crushed or ground to
separate values from  gangue, as  well as by the density difference and other factors. In
general, the first two methods were historically used in the recovery of gold.

       Coarse/Fine Concentration. Separation in this step involves particle density rather
       than size.  Sluices are commonly used in this step, although jigs and screens may also
       be employed.  The heavy  minerals settle within the lining material of the sluice,  while the
       lighter material is washed  through. Most of the material that enters  the sluice exits as

-------
2-6 Chapter 2: Overview of Mining and Mineral Processing Operations	

       slurry waste that is discharged to a tailings pond or undergoes further concentration.
       After coarse concentration, most waste material has been removed, leaving a
       concentrate.  The concentrate may then be subjected to fine concentration methods,
       including jigs, spiral classifiers, shaking tables,  and pinched sluices. The waste at this
       stage is a slurry. Amalgamation sometimes followed fine concentration.
                                                             Highlight 2-1
                                                         Carson River Mercury

                                              The Carson River Mercury Site consists of a 50-mile
                                              stretch of the Carson River, downstream of Carson
                                              City, Nevada. The site has been contaminated by
                                              mercury used in the amalgamation of gold and silver.
                                              In the late 1800s, large amounts of mercury were
                                              used during the milling of the Comstock Lode near
                                              Virginia City. Gold mining and processing began in
                                              the late 1880's. An estimated 7,500 tons of mercury
                                              were lost during the processing. Mercury has
                                              contaminated the hundreds of tailings piles and the
                                              Carson River sediments.
       Amalgamation.  Native gold or free
       gold can be extracted by using liquid
       mercury to form an amalgam. The
       gold is then recovered by filtering the
       amalgam through a canvas cone to
       drain off the excess mercury.
       Although the amalgamation process
       has, in the past, been used
       extensively for the extraction of gold
       from pulverized ores and placer
       gravels, it has largely been
       superseded in recent years by
       cyanidation processes (i.e. leaching).
       The current practice of amalgamation
       in the  United States is limited to small-scale barrel amalgamation of a relatively small
       quantity of high-grade, gravity-concentrated gold ore.  The amalgam is then retorted to
       separate the gold and mercury.  Historically, the methods used to obtain the amalgam
       allowed some of the mercury/amalgam to escape the process. Several Superfund sites
       (notably Carson River, see Highlight 2-1) have experienced severe mercury
       contamination from amalgamation.

       Sink/Float Separation.  Sink/float separation, also known as heavy media separation,
       uses buoyancy forces to separate the various minerals on the basis of density. The ore
       is fed  to a tank containing  a medium whose density is higher than that of the gangue
       and less than that of the valuable ore minerals. As a result, the gangue floats and
       overflows the separation chamber, and the denser values sink and are drawn off at the
       bottom.  Media commonly  used for sink/float separation in the ore milling industry are
       suspensions of very fineferrosilicon or galena (PbS) particles. The float material
       (waste) may be used for other applications, such as aggregate, since it is already
       crushed.

Magnetic Separation. Magnetic  separation is applied in the ore milling  industry, especially the
beneficiating  ores of iron, columbium and tantalum, and tungsten, both for extraction of values
from ore and  for separation of different valuable minerals recovered from complex ores.
Separation is based on differences in magnetic permeability (which, although small, is
measurable for almost all materials) and is effective in handling materials not normally
considered magnetic. The basic process involves transport of ore through a region of high
magnetic-field gradient where the  most magnetically permeable particles are attracted to a
moving surface, behind which is the pole of a large electromagnet. These particles are carried
out of the main stream of ore and  released into a conveyance leading to further processing.
Although dry  separators are used  for rough separations, drum separators are most often run
wet on the slurry ground in the mill.

Electrostatic Separation. Electrostatic separation is used to separate minerals on the basis of
their conductivity. This process is inherently dry and uses very  high voltages.  In a typical
application, ore is charged at 20,000 to 40,000 volts, and the charged particles are dropped
onto a conductive rotating drum. The conductive particles lose their attractive charge very

-------
	Chapter 2: Overview of Mining and Mineral Processing Operations 2-7

rapidly and are thrown off and collected, while the non-conductive particles keep their charge
and adhere by electrostatic attraction.  They may then be removed from the drum separately.

Flotation.  Flotation is a process by which the addition of chemicals to a crushed ore-water
slurry causes particles of one mineral or group of minerals to adhere to air bubbles. When air
is forced through the slurry, the rising bubbles carry with them the particles of the mineral(s) to
be separated from the matrix. A foaming agent is added that prevents the bubbles from
bursting when they reach the surface; a layer of mineral-laden foam is built up at the surface of
the flotation cell and this is removed to recover the mineral.

Flotation concentration has become a mainstay of the metal ore milling industry because it is
adaptable to very fine particle sizes. It also allows for high rates of recovery from slimes, which
are generated in crushing and grinding and which are not generally amenable to physical
processing. As a physical- chemical surface phenomenon, this  process can often be made
highly specific, thereby allowing  production of high-grade concentrates from very low-grade ore
(e. g. , more than 95 percent MoS2 concentrate from 0. 3 percent ore). Its specificity also
allows separation of different ore minerals (e. g.  , CuS, PbS, and ZnS) where desired, as well
as operation with minimum reagent consumption because reagent interaction typically occurs
only with the particular materials to be floated or depressed.

Details of the flotation process (e. g. , exact type and dosage of reagents, fineness of grinds,
number of regrinds, cleaner-flotation steps) differ at each operation where it is practiced and
may often vary with time at a given mill. A complex system of reagents is generally used,
including five basic types of compounds: pH conditioners (regulators, modifiers), collectors,
frothers,  activators, and depressants. At large-capacity mills, the total reagent usage can be
high even though only small  quantities are needed per ton of ore, since tens of thousands of
tons of ore per day may be beneficiated. The reagents often remain in the waste water,
allowing the usage to be lowered by recycling the water.  The reagents in the waste water may
however impact some of the other steps in the process, prohibiting the water from being
recycled.

Sulfide minerals are all readily recovered by flotation using similar reagents in small doses,
although reagent requirements and ease of flotation do vary throughout the class.  Sulfide
flotation is most often carried out at alkaline pH. Sulfide minerals of copper, lead, zinc,
molybdenum, silver, nickel, and  cobalt are commonly recovered by flotation. Non-sulfitic ores
also may be recovered by flotation, including oxidized ores of iron, copper, manganese, the
rare  earths, tungsten, titanium, and columbium  and tantalum. Generally, the flotation
processes for oxides are more sensitive to feed-water conditions than sulfide floats;
consequently, oxidized ores  can run less frequently with recycled water.  Flotation of these ores
involves very different reagents from sulfide flotation.  The reagents used  include fatty acids
(such as oleic acid or soap skimmings), fuel oil, and various amines as collectors, as well as
compounds (such as copper sulfate, add dichromate, and sulfur dioxide) as conditioners.

2. 3. 2 Beneficiation (Milling) Wastes and Hazardous Materials

The wastes generated by beneficiation milling operations are collectively known as tailings.
Readers should also be aware that unused or discarded chemicals assodated with these
beneficiation operations at historic mining sites also may remain onsite and need to be
managed during remediation. These could include: mercury at sites that have used
amalgamation and chemicals used in flotation such as copper sulfate, various amines, and
sodium cyanide.

-------
2-8 Chapter 2: Overview of Mining and Mineral Processing Operations
Tailings.  Tailings are the waste portions of mined material that are separated from the target
mineral(s) during benefidation. By far the larger proportion of ore mined in most industry
sectors ultimately becomes tailings that must be disposed. In the gold industry, for example,
only a few hundredthsof an ounce of gold may be produced for every ton of dry tailings
generated. Similarly, the copper industry typically mines relatively low-grade ores that contain
less than a few percent of metal values; the residue becomes tailings. Thus, tailings disposal is
a significant portion of the overall waste management practice at mining and milling operations.

The physical and chemical nature of tailings is a function of the ore being milled and the milling
operations used to beneficiate the  ore. The method of tailings disposal is largely controlled by
the water content of the tailings. Generally, three types of tailings may be identified based on
their water content:  wet, thickened, and dry. The type of tailing is less important from a
remediation perspective than from an active management perspective, although knowledge of
the type of tailings may help site managers characterize the material and better understand the
potential remediation alternatives.

Although the tailings have much lower concentrations of the target mineral(s) than in the mined
ore, they may be a source of contamination at the site due to the presence of sulfides such as
pyrite (acid generation), metals (available for mobilization in ground or surface waters), and
reagents added during beneficiation.  Tailings that are fine grained and managed under drier
conditions are especially prone to producing dust. Sulfide tailings oxidized by weathering are
potential generators of addic runoff.

In the past, and at present in some other countries, tailings often were disposed where
convenient. The tailings were discharged into rivers if flow was sufficient, held behind dams if
necessary, or placed on land. In the U.S., tailings now are managed, wet or thickened, in
tailings impoundments or dry in disposal piles. In  addition to placement  in management units,
certain tailings may beslurried as backfill into underground mines.

Tailings Impoundments. Wet tailings are slurried to tailings and settling ponds, where excess
liquid is evaporated or drained and the tailings allowed to dry. These impoundments  may range
in size from under an acre to up to a thousand acres. While the thickness (I. e.  , depth or
height) of these tailings impoundments may in some extreme cases be as much as 1,000 feet,
the thickness most commonly ranges from ten to fifty feet.

Four main types of slurry  impoundment layouts are employed: valley impoundments,  ring dikes,
in-pit impoundments, and specially dug pits (See Appendix A for Glossary terms). The stability
of tailing dams at abandoned mines represents a  remediation concern.  Historic methods of
tailings management included disposal into topographically low areas, often streams and
wetlands.  To the extent that these areas became diked incidentally by the nature of their
deposition they are  considered inactive impoundments for remediation planning.

Tailings Piles. Tailings may be dewatered or dried prior to disposal, thus reducing seepage
volume and the area needed for an impoundment or pile. Dry tailings piles are considerably
different from tailings piles created as a result of thickened tailings disposal.  Dry tailings may
be disposed in a variety of pile configurations, including a valley-fill (I. e.  , discharged  to in-fill a
valley), side hill (disposed of on a side of a hill in a series of piles), and level pile deposition in
lifts that are continually added.

-------
	Chapter 2: Overview of Mining and Mineral Processing Operations 2-9

Mine Backfilling.  Slurried tailings may be disposed in underground mines as backfill to
provide ground or wall support, thereby decreasing the above-ground surface disturbance and
stabilizing mined-out areas.  (Waste management economics may also drive deposition in
underground mines.)  For stability reasons, underground backfilling generally requires tailings
that have a high permeability, low compressibility, and the ability to rapidly dewater (I. e. , a
large sand fraction). As a result, often only the sand fraction of tailings is used as backfill.
Tailings may be cycloned to separate out the coarse sand fraction for backfilling, leaving only
the slimes to be disposed of in an impoundment. To increase structural competence, cement
may be added to the sand fraction before backfilling.  In the proper geologic setting, this
practice may have significant value  to remediation teams looking to fill underground mines and
fissures to stop acidic mine water release while redudng tailings volume on the surface. In
other cases efforts to backfill or seal the mine could increase the risk of generating AMD.

Subaqueous Disposal. Underwater disposal in a permanent body of water, such as a lake,
ocean, or an engineered structure (e. g., a pit or impoundment), has been an historical
management practice and is still practiced in some other countries (e. g., Canada). The
potential advantage to underwater disposal is the inhibition of oxidation of sulfide minerals in
tailings, thus preventing or slowing acid generation. Substantial uncertainty exists regarding
other short- and long-term effects on the water body into which the tailings may be disposed.
Regulations under the Clean Water Act (e. g. , the  effluent limitation guidelines for mills that
beneficiate base and precious metal ores) effectively prohibit subaqueous disposal of tailings in
natural water bodies (i.e., any discharge to "waters of the U. S.").
2. 4   Beneficiation: Leaching

Leaching is the process of extracting a soluble metallic compound from an ore by selectively
dissolving it in a suitable solvent, such as water, sulfuric acid, or sodium cyanide solution. The
target metal is then removed from the "pregnant" leach solution by one of several
electrochemical or chemical means.  (Note that digestion, where the ore concentrate is
digested completely or significantly by a strong liquor, is not considered  leaching under RCRA.
The significance of this difference is that wastes from digestion are not excluded from
management as hazardous waste, while wastes from leaching operations are excluded.)

Specific solvents attack only one (or, at most, a few) ore constituent(s), including the target
metal or mineral.  (Note that in situ mining is fundamentally the same leaching operation  except
the ore is not excavated.) Ore may be crushed or finely ground to expose the desired mineral
prior to leaching.  The tailings from a other beneficiation process, such as flotation, may be
leached to remove additional metal.  Ores that are too low in grade to justify the cost of milling
may be recovered  by dump or heap leaching.

2. 4. 1 Types of Processes Associated with Leaching

The leaching  process consists of preleaching activities, the actual leaching  operation, and the
recovery of the mineral value from the pregnant leach liquor. Each of these efforts is distinct
from the others and generates different types of waste streams.

Preleaching Activities. Depending on the grade of the ore and the type of leaching operation
for which the ore is intended, some preprocessing may be required.  Most heap and dump
leach operations use ores that are not preprocessed other than by some comminution (e. g.
crushing). (Note that, under RCRA, EPA has included in the definition of beneficiation the

-------
2-10 Chapter 2: Overview of Mining and Mineral Processing Operations	

activities of roasting, autoclaving, agglomeration, and/or chlorinating in preparation for leaching;
wastes from these activities currently are exempted from regulation as hazardous wastes.)

       Roasting. The activity of roasting ores is discussed because particulate materials from
       roasting operations,  known as fines, have been found to contribute to the environmental
       impacts at several mine sites being remediated under CERCLA. Certain ores are
       subjected to heating in roasterfurnaces to alter the  compound, to drive off impurities,
       and/or to reduce water content.  For example, roasting is used to treating sulfide gold
       ore, to make it more amenable to leaching. The roasting, with sodium, of certain metals
       that form insoluble anionic species (e. g., vanadium)  convert the ore values to soluble
       sodium salts (e. g. , sodium vanadate), which, after  cooling, may be leached with water.

       Roasters do not use the intense heat of the smelters and refineries and the ores are not
       processed in a molten state with chemical changes  occurring. Roasting may, however,
       drive off sulfur dioxide or other substances and emissions often have significant
       particulate content.

       Autoclaving. Autoclaves use pressure and high temperature to prepare some ores for
       leaching activities. The autoclave is used to convert the ore to an oxide form which is
       more amenable to leaching. The ore is generally in a  slurry form in the autoclave.

Leaching Operations. Leaching operations may be categorized both by the type of leachant
used as well as the physical design of the operations.

       Physical Design. Several types of leaching  operations are used, typically dependant
       on the ore-grade, the leachant, and  the target material.

              Dump Leaching.  Piles of low-grade  ore are often placed directly on the ground,
              leachant added by a spray or drip system, and leachate containing the
              solubilized target metal collected from underneath the dump over a period of
              months or years.  The dumps are dedicated, that is they are designed to leave
              the ore  in place after leaching operations are complete. Dump leach operations
              designed to recover gold more often are being designed with  a plastic liner prior
              to placing the ore in order to facilitate  recovery of pregnant solution as well as to
              minimize release to the environment of the cyanide leachant.

              Heap Leaching.  In heap leach operations the ore is placed on lined pads in
              engineered lifts or piles.  The pad may be constructed such that heavy
              machinery may be used to off load the leached ore for disposal prior to placing
              new ore on the pad but more commonly the  heap remains in place when
              leaching ends. As with dump leaching the leachant may be applied by spray or
              portable drip units; recovery is from beneath the ore on the impermeable pad
              (typically designed with a slight grade and a  collection system).

              Tank Leaching.  In vat or tank leaching the  milled ore is placed in a container
              equipped for agitation, heating, aeration, pressurization, and/or other means of
              facilitating the leaching of the target mineral.

       In all three cases a solution management system is required, either in surface
       impoundments or tanks.  Some operations use ponds that were designed with a
       compacted earthen liner (e. g. , day), but most copper and all gold operations use
       synthetic liners with leachate collection systems. Dumps often have a collection pond

-------
	Chapter 2: Overview of Mining and Mineral Processing Operations 2-11

       down-gradient from the dump; heap leach units are more likely to have a system for
       collecting solution directly off the pad.  Tank and vat leaching operations may be
       completely closed systems with no ponds incorporated in the design.

       Leachants.  Leaching also may be characterized by the type of solution being used to
       leach the ore and recover the target metal.

             Acid Leaching. Certain target metals are particularly receptive to leaching by
             acidic solutions. Copper, for example, is leached by asulfuric acid solution.

             Cyanide Leaching. Sodium cyanide has been used extensively to recover gold
             from low-grade ores. Continued improvements in cyanidation technology have
             allowed increasingly lower grade gold ores to be mined  economically.

             Dissolution. Water is used to separate certain water-soluble compounds, such
             as sodium, boron, potassium, and certain salts (some that may be formed by
             roasting). The compounds are dissolved, purified using basic water chemistry
             and filtration, then recrystallized.

Recovery Processes.  The values contained in the pregnant leach solution are recovered by
one or more of several methods, including the following:

       Precipitation. In this process, the metals dissolved in the pregnant leachate are forced
       into an insoluble solid form and then filtered or settled out for recovery.  Methods to
       cause precipitates to form may be chemically treating, evaporating, and/or changing the
       temperature and/or pH.

       Electrowinning. The pregnant leachate may be placed in an electrolytic cell and an
       electric charge applied.  The metal plates out of the solution on the cathode.  Insoluble
       precipitates may settle out as a material referred to as slimes.

       Carbon Adsorption. Activated carbon may  be used to adsorb the metal values from
       the solution. The carbon is then leached to recover the adsorbed metals.

       Cementation. In this method, the metal is "cemented" out of solution by replacement
       with less active metal.  For example, when a  copper leachate solution (CuSO4) is
       brought  into contact with scrap iron plates, the copper replaces the iron  on the scrap
       plates and the iron goes  into solution (FeSO4). The copper is then removed by washing
       the scrap plates.

       Solvent Extraction. A chemical-specific solvent may be used to selectively extract a
       mineral value dissolved in the pregnant leachate. This is often used in the case of
       copper ore leaching; a proprietary organic chemical dispersed in a kerosene dilutent is
       used.  The copper may then be extracted from the organic base with a strong sulfuric
       acid which can be electrowinned.

-------
2-12 Chapter 2: Overview of Mining and Mineral Processing Operations	

2. 4. 2 Leaching Wastes and Hazardous Materials

Dump and Heap Leach Waste. Following leaching, the large piles of spent ore that remain
are usually left in place.  These leach piles vary widely in size, the largest may cover hundreds
of acres, may rise to several hundred feet, and may contain tens of millions of tons of leached
ore. Reusable heap leach pad operations typically have a nearby waste unit for disposal of
spent ore.  Alternatively, leached ore from pads may be moved to a dedicated dump for
additional and long term dump leaching.  Uncollected leachate from these piles is a potential
source of contamination of ground water, surface water, and soil.  In addition, other
contaminants (notably, arsenic, mercury, and selenium,  but also including many other heavy
metals) that are present in the spent ore may appear in leachate over time. Acid drainage may
be generated from the oxidation of sulfide ores and require control. For both  dump and heap
leaching, transport by wind-blown dust and/or storm-water erosion may result in physical
contamination off site.

Spent Leachate. When the leach operation is decommissioned or the  leachate become
necessary for replacement, the spent leachate becomes a waste requiring appropriate
management.  Leachate in the piles may continue to be released after operations cease.  For
example, where gold extraction processes use cyanide to leach  the metal from the host rock,
the unpurged or  untreated cyanide solution maybe washed by rain and snowmelt into streams
or ground water systems if recovery and recycling systems are not working properly.

Electrowinning  Slimes and Crud.  Slimes and crud result from impurities separated from the
metal value in electrowinning. The slimes that  settle out typically are recovered and treated to
recover precious metals, such as gold and silver. Crud results from impurities that foam up in
the electrolytic bath used in electrowinning; these typically are vacuumed from the cells and
returned to the leach operations.

Spent Carbon.  Spent carbon is the waste product remaining after the desired metals have
been  removed from activated carbon.  The activated carbon may contain other metals and
chemicals that were in the ore or used in process, including mercury or cyanide. The spent
carbon is often "reactivated" in the mining process.
2. 5   Mineral Processing

Following beneficiation (i.e., leaching or milling) to concentrate the mineral value, the
concentrate typically is processed to further extract and/or refine the metal, thus preparing it for
its final use or for incorporation into physical or chemical manufacturing (as noted previously,
mineral processing is often used within the industry to refer to any post-extraction activities,
including beneficiation; EPA, at least under the RCRA program, excludes beneficiation from
mineral processing). At some locations, post-mineral processing operations may occur, or
have occurred,  as well (note that under RCRA, EPA delineated a regulatory distinction between
mineral processing and post-mineral processing, although the actual regulatory significance of
this is now minimal). An example of post-mineral processing is the alloying process, in which
various alloys are added to, for example, steel (i.e., a product of mineral processing) to  make
alloy steel (which is  not a product of mineral processing). While this may not affect how a site
manager approaches the remediation if the operations are co-located, it may affect the
understanding of ARARS or what potential impacts from various operations may be expected.

-------
	Chapter 2: Overview of Mining and Mineral Processing Operations 2-13

2. 5. 1 Types of Mineral Processing Operations

There are a variety of mineral processing operations, including the following major categories:
pyrometallurgical operations (e. g. , smelting, refining, roasting ), hydrometallurgical operations
(e. g. , digestion of phosphate in producing phosphoric acid), and electrometallurgical
operations (e. g. ,  electrolytic refining).

Note that mineral processing may be further categorized as primary or secondary. Broadly
defined, primary mineral processing is focused on processing concentrates from extraction and
beneficiation of raw ores whereas secondary processing focuses on recycling metals or
minerals.  Primary  mineral processing, such as smelting, may, and often does, incorporate into
its charge mineral  processing wastes (e. g. , flue dust), scrap, and/or other metals/mineral
bearing materials (e. g. , sludge or residues). (Note that under RCRA, EPA requires that
feedstocks be at least 50 percent extraction and beneficiation products to be considered
primary; the significance focuses on certain wastes such as lead smelter slag that are exempt
at primary lead smelters but regulated as potentially hazardous waste at secondary lead
smelters).

Smelting.  Smelting is the most common pyrometallurgical process and involves the
application of heat to a charge of ore concentrate and flux in a furnace. Smelting produced
separate molten streams of matte (i.e. , molten product), slag and dross, and dust, an important
by-product.  Historically, high-grade ore from the mine may have been smelted directly with no
intermediate concentration.

Roasting.  Roasting, a relatively low heat pyrometallurgical process,  may be used to prepare
ores, especially sulfide ores, for smelting (note that EPA, under the RCRA program, makes a
distinction between roasting prior to leaching, which is beneficiation, and roasting prior to
smelting, which is  mineral processing).  Roaster furnaces produce particulate matter referred to
as roaster fines, as well as gaseous emissions such as sulfur dioxide. Where sulfur dioxide is
generated, such as the copper smelting sector, the sulfur elements are now often captured in
acid plants and saleable or useable sulfuricacid  generated.  In the past, sulfur dioxide
emissions, as well  as arsenic and other contaminants, were uncontrolled,  and in some  cases
contaminated wide areas.

Retorting.  In processing metals that are relatively volatile, retort furnaces are employed to
heat the ore concentrate and vaporize the metal (e. g. , zinc, mercury, phosphorus).  The
vaporized metals are then condensed and recovered. The non-volatilized waste material
remaining in the retort is typically referred to as slag (e. g. , zinc slag, ferrophosphorus).

Fire Refining.  Fire refining is a pyrometallurgical process that typically involves heating
smelted material (e. g. , blister copper) in a furnace.  A flux may be added, and air then blown
through the mixture to oxidize impurities. Most of the remaining sulfur and other impurities
vaporize or convert to slag. Copper is fire refined with the molten copper  being poured into
molds to form anodes to be used in electrolytic refining if required.  Refining in the lead sector,
referred to as softening, generates slags with antimony, arsenic, tin, and copper oxides.

Grossing. In the lead sector, dressing follows the initial smelting.  In this step, the molten lead
is agitated in a dressing kettle and cooled to just above the freezing point, thereby causing
metal oxides, including lead oxide and copper oxide, to solidify and float to the surface as
dross. The dross,  predominantly lead oxide, is treated for metals recovery. Other drossing-
refining steps in the lead sector are decopperizing, where sulfur is added  rather than oxygen to

-------
2-14 Chapter 2: Overview of Mining and Mineral Processing Operations	

remove cuprous sulfide as dross, and desilverizing, where zinc is added to alloy insolubly with
precious metals that float up as dross.

Electrolytic Refining. Electrolytic refining, a electrometallurgical process typically applied in
the copper and zinc industry, uses an electric current in an electrolytic bath in which the metal
feed is dissolved. In the copper sector, this may occur following fire-refining  by using anodes of
copper that dissolve with the copper reforming on the cathode. Zinc concentrates from
leaching also may be refined electrometallurgically. The leachate is placed in the electrolytic
cell, a current is applied, and the metal  is removed on the cathode. Within the cells,  impurities
will either dissolve in the electrolyte but not plate on the cathode or precipitate as a material
referred to  in the industry as "slimes".  Cathodes are removed and melted in  a furnace and the
metal cast  into saleable shapes.

Digestion. Digestion is a hydrometallurgical process in which the concentrate is reacted with a
strong liquor (typically hot acid) and the metal value is dissolved. This pregnant liquor is then
processed  to purify and precipitate the metal or mineral compound.  Impurities maybe left
behind as digester solids or precipitated out separately from the mineral value. Primary
examples of digestion operations are phosphoric acid production (i.e., in which phosphate
concentrate is digested with  sulfuric acid to produce phosphoric acid and calcium sulfate
otherwise known as phosphogypsum) or production of titanium tetrachloride.

2. 5. 2 Types of Mineral Processing Wastes and Hazardous Materials

Each of the different types of mineral processing operations generate its own specific waste
streams. Note that certain are large volume wastes, and where considered to be of low hazard,
continue to be excluded from regulation as hazardous under EPA's RCRA program.  Many of
the mineral processing wastes that are  identified below are or were recycled  back to the
mineral processing facilities, since they generally contain high levels of metals. Others were
disposed or dispersed  at the mine site and are the focus of remedial concern at many
abandoned or inactive mine sites.

Slag and Dross. Slag and dross are partially fused wastes  produced when impurities in
metallic ores or concentrates separate from the molten metal during smelting and fire-refining
processes. Slag contains the gangue minerals, such as waste minerals and  non-valuable
minerals, and the flux.  In some sectors, the slag is processed to recover some portion that may
be of value. In these cases, the portion not recovered is disposed, typically onsite, or sold for
use as fill or base material where regulations allow. Historically, several sites where slag was
used as  road bed material have significantly impacted local environments.

Dross is the collection of impurities, typically metal oxides, that float on the molten metal in the
furnace. Often, it consists of materials  that can be recovered for their mineral value.  Dross
often was either  recycled  or sent on for further processing.  Both dross and slag also have
historically been disposed in waste piles. Current regulation, however, calls for prescribed
landfill disposal if not recycled.

Spent Furnace (Refractory) Brick. This material, as its name implies, is from the furnace or
refractory liner and is generated in a relatively small quantity. Smelters within some  mineral
processing sectors return this material to the blast furnace to recover any accumulated mineral
value; otherwise, this material is placed in disposal units. At some historical  sites these brick
remain, creating needs for remediation.

-------
	Chapter 2: Overview of Mining and Mineral Processing Operations 2-15

Potliner.  Potliner is a specialized form of electrolytic cell liner used in the aluminum production
process. Potliners may contain toxic levels of arsenic and selenium, as well as detectable
levels of cadmium, chromium, barium, lead, mercury, silver, sulfates, and cyanide.  While
portions of the potliners currently are now recovered and recycled, much of the material is
managed  as a listed hazardous waste.

Roaster Fines.  Fine particulate materials may be generated by roasterfurnace operation.
Currently, these materials are typically recycled to the mineral processing operation as
permitted  under RCRA.  Historically, however,  roaster fines, at least at some sites,  went
uncollected and were dispersed downwind; in other cases they were collected and disposed in
waste piles. At least one Superfund National Priority List (NPL) site has identified roaster fine
impacts on the mine site.

Stack Emissions. Emissions from the smelter and refiner furnaces are, under current
regulations, treated to remove regulated materials, including particulates, lead, and sulfur
dioxide. In some historic operations, these stack emissions were released unaltered, resulting
in the dispersal of contaminants to a wide area, especially in the predominant downwind area.
Lead contamination by smelter emission  has created significant contamination at several of the
NPL mine sites.  Today, the dusts in these emissions are collected to  meet air emission
standards, and the resulting air pollution control dusts are managed appropriately.

Pollution Control Sludges. With the advent of wastewater treatment and air pollution  control,
sludges have been generated at most mineral  processing operations.  In the cases of smelter
operations, these sludges are typically recycled to the smelter to recover mineral value.  Where
this is not feasible, the sludge is disposed onsite.

Slimes from Electrolytic Refining. Slimes result from impurities that settle out of the
electrolytic bath  used in electrolytic refining or electrowinning.  Typically, these are  recovered
and treated to recover precious metals, such as gold and silver.

Spent Electrolyte. Spent electrolyte (often called bleed electrolyte when it is removed in small
portions rather than at one time) typically is contaminated by a variety of metals and other
compounds.  Today, these electrolytes are typically purified and  recycled.

Process Wastewater.  Various process wastewaters are and have been generated during
various pyrometallurgical operations.  Historically, these have been co-managed with tailings if
the smelter or refinery was co-located. In other cases, discharge to surface waters or surface
impoundments was the preferred approach. Today, these wastes are managed under the
Clean Water Act (i.e., under the NPDES program), RCRA (e. g, surface impoundment
regulation and land application), or the Safe Drinking Water Act (e. g.  , discharge into injection
wells).

-------
2-16 Chapter 2: Overview of Mining and Mineral Processing Operations	

2. 6   Additional Sources of Information

For additional comprehensive references to mineral processing and associated wastes, see the
following EPA documents:

      USEPA, OSW.  12-95. Identification and Description of Mineral Processing Sectors and
      Waste Streams.  WDC; and

      USEPA, OSWER. 7-90.  Report to Congress on Special Wastes from Mineral
      Processing. EPA530-S W-90-070C. WDC.

      USEPA, OSWER. 12-85. Report to Congress on Wastes from the Extraction and
      Beneficiation of Metallic Ores, Phosphate Rock, Asbestos, Overburden from Uranium
      Mining, and Oil Shale.  EPA 530-SW-85-033.

      USEPA, OW. 11-82. Development Document for Effluent Limitations Guidelines and
      Standards forthe Ore Mining and Dressing Point Source Category, EPA 440/1-82/061.

-------
                                     Chapter 3
                    Environmental Impacts from Mining
3.1    Introduction

This chapter introduces site managers to the types of impacts mining and mineral processing
operations can have on the environment. Knowledge of these impacts will be important during
site scoping, characterization, and alternative selection.  This background information provides
valuable insight into the contaminants that may be present, potential threats to human health
and the environment, and feasibility of response actions.  There are thousands of inactive
and/or abandoned mine sites on federal, state, tribal and private land.  While the majority of
these sites are not believed to present significant environmental problems, there are,
nonetheless, many sites that do create significant impacts.  In addition to the impacts of
individual mine sites,  the cumulative impact of multiple sites within a historic mining district
often has the potential to impair beneficial uses of local surface and groundwater.
              Highlight 3-1
     Major categories of mining impacts:

        Acid Drainage

        Metals contamination of
        ground/surface water and sediments

        Sedimentation

        Cyanide

        Air emissions and deposition

        Physical impacts
A variety of environmental impacts may occur at
an abandoned mine site. Highlight 3.1 lists the
major categories of abandoned mine site impacts.
Leading the list is acid generation, which is one of
the largest problems from hardrock metal mining.
This chapter describes those that are specific to
mine sites. Effects from process or waste
management units common to non-mine sites
(e.g., leaking  underground storage tanks, solvent
disposal from mechanical shops) or involving
contaminants found at many sites (e.g., PBCs,
solvents, petroleum, chemicals used in
processing); are not addressed in this reference
document.
The following sections describe each of these environmental impacts characteristic of mine
sites requiring remediation.
3.2    Acid Drainage

The formation of acid drainage and the contaminants associated with it has been described as
the largest environmental problem facing the U.S. mining industry (for additional information
regarding  acid drainage refer to Appendix B).  Commonly referred to as add rock drainage
(ARD) or acid mine drainage (AMD), acid drainage may be generated from mine waste rock or
tailings (i.e., ARD) or mine structures, such as pits and  underground workings (i.e., AMD).  Acid
generation can occur rapidly, or it may take years or decades to appear and reach its full
potential.  For that reason, even a long-abandoned site can intensify in regard to its
environmental  impacts.

The severity of, and impacts from, AMD/ARD are primarily a function of the mineralogy of the
rock material and the availability of water and oxygen.  While acid may be neutralized by the
receiving water, some dissolved metals may remain in solution.  Dissolved metals in acid
drainage may include lead, copper, silver, manganese, cadmium, iron, and zinc, among other
metals. Elevated concentrations of these metals in surface water and ground water can
preclude their use as drinking water or aquatic habitat.

-------
3-2 Chapter 3: Environmental Impacts from Mining
Acid Drainage Generation. Acid is generated at mine sites when metal sulfide minerals are
oxidized and sufficient water is present to mobilize the sulfur ion. Metal sulfide minerals are
common constituents in the host rock associated with metal mining activity.

Prior to mining, oxidation of these minerals and the formation of sulfuric acid is a function of
natural weathering processes.  The oxidation of undisturbed orebodies followed by the release
of acid and mobilization of metals is slow. Natural discharge from such deposits poses little
threat to receiving aquatic ecosystems except in rare instances.  Mining and beneficiation
operations greatly increase the rate of these same chemical reactions by removing large
volumes of sulfide rock material and exposing increased surface area to air and water.
Materials/wastes that have the potential to generate ARD as a result of metal mining activity
include mined material, such as spent ore from heap and dump leach  operations, tailings, and
waste rock units, as well as overburden material. AMD generation in the mines themselves
occurs at the pit walls in the case of surface mining operations and in the underground
workings associated with underground mines.

The potential for a mine or its associated waste to generate acid and release contaminants
depends on many factors and is site-specific.  These site-specific factors can be categorized as
generation factors, control factors, and physical factors.

Generation Factors.  Generation factors determine the ability of the material to produce acid.
Water and oxygen are necessary to generate acid drainage; certain bacteria enhance acid
generation. Water serves as a reactant, a medium for bacteria, and the transport medium for
the oxidation  products. A ready supply of atmospheric oxygen is required to drive the oxidation
reaction.  Oxygen is particularly important in maintaining the rapid oxidation catalyzed by
bacteria at pH values below 3.5.  Oxidation of sulfides is significantly reduced when the
concentration of oxygen in the pore spaces of mining waste units is less than 1 or 2 percent.
Different bacteria are better suited to different pH levels and physical factors (discussed below).
The type of bacteria and population sizes change as growth conditions are optimized.

Chemical Control Factors. Chemical control factors determine the products of oxidation
reaction.  These factors include the ability of the generation rock or receiving water to either
neutralize the acid (i.e., positive effect) or to change the effluent character by adding metals
ions mobilized by residual  add (i.e., negative effect). Neutralization of acid  by the alkalinity
released when acid  reacts with carbonate minerals is an important means of moderating acid
production and can serve to delay the onset of acid production for long periods or even
indefinitely. The most common neutralizing minerals are calcite and dolomite.  Products from
the oxidation  reaction, such as hydrogen ions and metal ions, may also react with other non-
neutralizing constituents.   Possible reactions include ion exchange on clay particles, gypsum
precipitatbn,  and dissolution of other minerals. The dissolution of other minerals contributes to
the contaminant load in the acid drainage. Examples of metals occurring in the dissolved form
include aluminum, manganese, copper, lead, zinc, and others.

Physical  Factors. Physical factors include the physical characteristics of the waste or
structure,  the way in which acid-generating and acid-neutralizing materials are  placed, and the
local hydrology. The physical nature of the material, such as particle size,  permeability, and
physical weathering characteristics, is important to the acid generation potential. Though
difficult to weigh, each  of these factors influences the potential for acid generation  and is,
therefore, an  important consideration for long term waste management.  Particle size is a
fundamental concern because it affects the surface area exposed to weathering and oxidation.
Surface area is inversely proportional to particle size. Very coarse grain material, as is found in
waste rock dumps, exposes less surface area but may allow air and water to penetrate deeper
into the unit, thereby exposing more material to oxidation and ultimately producing more acid.
Air circulation in coarse material is aided by wind, changes in barometric pressure, and possibly

-------
                                            Chapter 3: Environmental Impacts from Mining 3-3
convective gas flow caused by heat generated by the oxidation reaction.  In contrast, fine-grain
material (e.g., tailings) may retard air and very fine material may limit water flow; however, finer
grains expose more surface area to oxidation. The relationships among particle size, surface
area, and oxidation play a prominent role in acid prediction methods and in mining waste
management units. As waste material weathers with time, particle size is reduced, exposing
more surface area and changing physical characteristics of the waste unit.  However, this will
be a slower process
                 Highlight 3-2
                  Eagle Mine

 Zinc and other base and precious metals were
 produced from ores excavated from the underground
 mine in central Colorado from 1878 to 1977. The
 resultant wastes consist of roaster piles, tailings
 ponds, waste rock piles and acid drainage from the
 mine.  Percolation  from the tailings ponds has
 contaminated ground water below and down gradient
 of the ponds.  The  ground water discharges to a
 nearby stream.  Runoff from the roaster, waste piles
 and acid drainage from the mine also discharge
 directly to the stream.  The main parameters of
 concern are pH, arsenic, cadmium, copper, lead,
 manganese, nickel, and zinc. In particular,
 concentrations of cadmium, copper, and zinc exceed
 water quality criteria in the stream. In addition, levels
 of dissolved solids are also above background
 concentrations.  At  least two private wells previously
 used for drinking water have been contaminated.
 The site is currently on the National Priorities List
 and various remedial actions have taken place.
                                               A number of studies and publications address
                                               acid drainage. Historically, acid generation
                                               remediation efforts have centered around
                                               acid drainage from coal  mines and their
                                               associated  spoils.  Increasingly, acid
                                               generation  is being managed at hardrock
                                               mines. Active treatment (e.g., lime treatment
                                               and settling) has been successfully used and
                                               passive treatment (e.g., anoxic limestone
                                               drains) have been  tried with some limited
                                               success and constant improvement.

                                               3.3    Metal Contamination of Ground
                                                      and Surface Water, and Associated
                                                      Sediments
                                               Mining operations can affect ground water
                                               quality in several ways.  The most obvious
                                               occurs in mining below the water table, either
                                               in underground workings or open pits. This
                                               provides a direct conduit to aquifers. Ground
                                               water quality is also affected when waters
(natural or process waters or wastewaters) infiltrate through surface materials (including
overlying wastes or other material) into ground water. Contamination can also occur when
there is an hydraulic  connection between surface and ground water. Any of these can cause
elevated pollutant  levels in ground water.  Further, disturbance in the ground water flow regime
may affect the quantities of water available for other  local uses.  In addition, contaminated
ground water may discharge to surface water down gradient of the mine, as contributions to
base flow in a stream channel or springs.

Dissolved pollutants  at a mine site are primarily metals but may include sulfates, nitrates, and
radionuclides; these  contaminants, once dissolved, can migrate from mining operations to local
ground and surface water (contamination of surface water may also occur as contaminated  soil
or waste materials are eroded and washed into water bodies). These  are discussed in section
3.4.). Dissolved metals may include lead, copper, silver, manganese,  cadmium, iron, arsenic,
and zinc.  Elevated concentrations of these metals in surface water and ground water may
preclude their use  as drinking water. Low pH levels and high metal concentrations can have
acute and chronic  effects on aquatic life/biota. While AMD/ARD can enhance contaminant
mobility by promoting leaching from exposed wastes and mine structures, releases can also
occur under neutral pH conditions.

Dissolution of metals due to low pH is a well known characteristic of each acid drainage.  Low
pH is not necessary  for metals to  be mobilized and to contaminate waters; there is increasing
concern about neutral  and high pH mobilization.

-------
 3-4 Chapter 3: Environmental Impacts from Mining
 Sources. Primary sources of dissolved pollutants from metal mining operations include
                                                underground and surface mine workings,
i                                                overburden and waste rock piles, tailings piles
                                                and impoundments, direct discharges from
                                                conventional milling/beneficiation operations,
                                                leach piles and processing facilities, chemical
                                                storage areas (runoff and spills), and
                                                reclamation activities.  Discharges of process
                                                water, mine water, storm and snowmelt
                                                runoff, and seepage are the primary transport
                                                mechanisms to surface water and ground
                                                water.
                Highlight 3-3
              California Gulch

The California Gulch Superfund site, located in the
upper Arkansas River Valley in Lake County,
Colorado, is an example of a site severely affected by
metal contamination. The study area for the remedial
action encompasses approximately 15 square miles
and includes California Gulch, a tributary of the
Arkansas River, and the City of Leadville. Mining for
lead, zinc, and gold has occurred in the area since
the late 1800's. The site was added to the National
Priority List (NPL) in 1983. A remedial investigation
(Rl) conducted by EPA in 1984 indicated that the
area is contaminated with metals, including  cadmium,
copper, lead, and zinc migrating from numerous
abandoned and active mining operatbns. A primary
source of the metals contamination in the Arkansas
River is via the California Gulch. The Yak Tunnel,
built to drain the local mine workings, drains into the
California Gulch. Acid generated in the mine
dissolves and mobilizes cadmium, copper, iron, lead,
manganese, zinc, and other metals. The tunnel and
its laterals and drifts collect this metal-laden acidic
water and discharge it into California Gulch, the
Arkansas River, and the associated shallow alluvial
ground-water and sediment systems. From  previous
investigations and sampling data, itwas concluded
that, as of the early 1980's, the Yak Tunnel
discharged a combined total of 210 tons per year of
cadmium, lead, copper, manganese,  iron, and zinc
into California Gulch.  Starting in 1990, one  of the
PRPs consented to build and operate a treatment
plant for the Yak Tunnel discharge. The treatment
plant operates continuously and has significantly
improved water quality of the Arkansas River, into
which it discharges.
                                                Naturally occurring substances in the site
                                                area are the major source of these pollutants.
                                                Mined ore not only contains the metal being
                                                extracted but varying concentrations of a wide
                                                range of other metals (frequently, other
                                                metals may be present at much higher
                                                concentrations and can be significantly more
                                                mobile than the target mineral). Depending
                                                on the local geology, the ore (and the
                                                surrounding waste rock and overburden) can
                                                include trace levels of aluminum, arsenic,
                                                asbestos, cadmium, chromium, copper, iron,
                                                lead,  manganese, mercury, nickel, silver,
                                                selenium, and zinc.

                                                Chemicals used in mining and beneficiation
                                                are also a potential source of water
                                                contamination. Common types of reagents
                                                include copper, zinc, chromium, cyanide,
                                                nitrate and phenolic compounds, and sulfuric
                                                acid at copper  leaching operations. With the
                                                exception of leaching operations and possibly
 the extensive use of nitrate compounds in blasting and  reclamation, the quantities of reagents
 used are relatively small compared to the volumes of water generated. As a result, the risks
 from releases of toxic pollutant from reagents not related to leaching are generally limited.

 Sediment Contamination. Mining processes can result in the contamination of associated
 sediments in receiving streams when dissolved pollutants discharged to surface waters partition
 to sediments in the stream. In addition, fine grained waste materials eroded from mine sites
 can become sediments, as described in Section 3.4 below.  Specifically, some toxic
 constituents (e.g., lead and mercury) associated  with discharges from mining operations  may
 be found at  elevated levels in  sediments, while not being detected in the water column or being
 detected at  much lower concentrations.  Sediment contamination may affect human health
 through the  consumption offish and other biota that bioaccumulate  toxic pollutants.  Elevated
 levels of toxic pollutants in sediments also can have direct acute and chronic impacts on
 macroinvertebrates and other benthic organisms. Finally, sediment contamination provides a
 long-term source of pollutants through potential re-dissolution in the water column.  This can
 lead to chronic contamination  of water and aquatic organisms. Currently, no national sediment
 standards/criteria have been established for toxic pollutants assodated with mining operations.
 An ecological risk assessment may be an appropriate tool to evaluate sediment impacts.

-------
                                             Chapter 3: Environmental Impacts from Mining 3-5
3.4    Sedimentation of Surface Waters
Because of the large land area disturbed by mining operations and the large quantities of
earthen materials exposed at sites, erosion is a primary concern at mine sites. Erosion may
cause significant loading of sediments and any entrained chemical pollutants to nearby
streams, especially during severe storm events and high snowmelt periods.  Historic mining and
mineral processing sites may have discharged wastes directly into surface waters. This has
been particularly the case with tailings, that historically in many areas were deposited directly
into surface waters or placed at the edge of surface waters where erosions would transport the
tailings to the surface waters.

Erosion.  Water erosion may be described as the process by which soil particles are detached,
suspended, and transported from their original location.  Sedimentation is the byproduct of
erosion, whereby eroded particles are deposited at a different location from their origin.

The  factors influencing erosion and sedimentation are interrelated and all relate to either the
impact of precipitation or runoff velocity and volume. Sedimentation is considered the final
stage in the erosion process; thus, the mechanisms affecting  erosion also affect sedimentation.
The  main factors influencing erosion  include rainfall/snowmelt runoff, soil infiltration  rate,  soil
texture and structure, vegetative cover, slope length, and implementation of  erosion control
practices.
Sources of Loading. Major sources of
erosion/sediment loadings at mining sites
include open pit areas, heap and dump leach
operations, waste rock and overburden piles,
tailings piles, haul and access roads, ore
stockpiles, exploration areas, and
reclamation areas. The variability in natural
site conditions (e.g., geology, vegetation,
topography, climate, and proximity to and
characteristics of surface waters) combined
with significant differences in the quantities
and  characteristics of exposed materials at
mines preclude any generalization of the
quantities and characteristics of sediment
loadings. New sources are frequently
located in areas with other active operations,
as well as  historic abandoned mines. Other
non-mining sources also may contribute to
erosion impacts in the watershed.  At
smelter sites historic air emissions may have
caused toxicity to local vegetation,
increasing erosion potential in impacted
areas.
Environmental Impacts.  Particulate matter
is detrimental to local fish populations.
Decreased densities of macroinvertebrate
and benthic invertebrate populations have
been associated with increased suspended
solids.  Enhanced sedimentation within
aquatic environments also has the effect of inhibiting spawning and the development of fish
                Highlight 3-4
         Mineral Creek and Pinto Creek

The impacts of mines on aquatic resources have
been well documented.  For example, a Mineral
Creek fisheries and habitat survey conducted by the
Arizona Game and Fish and the U.S. Fish & Wildlife
Service showed that significant damage was caused
by an active mining activity on the shores of Mineral
Creek.  In summary, the upstream control station
showed an overhead cover (undercut bank,
vegetation, logs, etc.) of 50% to 75%.  The dominant
substrate was small  gravel, and in stream cover
consisted of aquatic vegetation. Rve species of fish
were captured for a total of 309 individual fish.  In
contrast, the downstream statbn showed an
overhead cover of less than 25%.  The dominant
substrate was small  boulders, and in stream cover
consisted of only interstitial spaces and very little
aquatic vegetation.  No species offish were captured
and very few aquatic insects were observed or
captured. This Mineral Creek survey shows a
significant degradation of habitat quality below the
mine. Pinto Creek, which received a massive
discharge of tailings and pregnant leach  solution from
an active copper mine, was also surveyed. The
tailings  had a  smothering, scouring effect on  the
stream. Pinto Creek is gradually recovering from this
devastating discharge through the import of native
species from unaffected tributaries. However, the
gene pool  of the native fish is severely limited as only
one age group offish has repopulated Pinto Creek. A
second unauthorized discharge of pollutants to the
creek could eliminate that fish species.

-------
3-6 Chapter 3: Environmental Impacts from Mining
eggs and larvae, as well as smothering benthic fauna. In addition, high turbidity may impair the
passage of light, which is necessary for photosynthetic activity of aquatic plants.

Contaminated Sediments.  Exposed materials from mining operations, such as mine
workings, wastes, and contaminated soils, may contribute sediments with chemical pollutants,
including heavy metals.  Contaminated sediments in surface water may pose risks to human
health and the environment as a persistent source of chemicals to human and aquatic life and
those non-aquatic life that consume aquatic life.  Human exposure occurs through experiencing
direct contact, eating fish/shellfish that have bioaccumulated toxic chemicals, or drinking water
exposed to contaminated sediments.  Continued  bioaccumulation of toxic pollutants in aquatic
species may limit their use for human  consumption.  Accumulation in aquatic organisms,
particularly benthic species, can also cause acute and chronic toxicity to aquatic life. Finally,
organic-laden solids have the effect of reducing dissolved oxygen concentration, thus creating
toxic conditions.

Physical Impacts.  Beyond the potential for pollutant impacts on human and aquatic life,
physical impacts are associated with the sedimentation, including the filling of deep pools
resulting in the loss of habitat for fish and an increase in temperature.  The sedimentation can
also result in the filling of downstream reservoirs reducing the capacity for both flood control
and power generation. The sedimentation can also cause the channel to widen and become
shallower, which may  increase the frequency of overbank flow.
3.5    Cyanide

The use of cyanide has a long history in the
mining industry. For decades, it has been
used as a pyrite depressant in base metal
flotation, a type of beneficiation process (see
Section 2.3). It also has been used for more
than a century in gold recovery (see Section
2.4).  In the 1950's, technology advances
that allowed large-scale beneficiation of gold
ores using cyanide (first demonstrated in
Cripple Creek, Colorado) set the stage for
the enormous increase in cyanide usage
when gold prices skyrocketed in the late 1970's and 1980's. Continued improvements in
cyanidation technology have allowed increasingly lower grade gold ores to be mined
economically using leach operations.  The use of cyanide in the leaching of gold ores has an
increased potential to impact the environment because of the greater quantity that is used in
leaching.
               Highlight 3-5
            The Summitville Mine

The Summitville Mine is an open-pit, heap-leach gold
mine using cyanide beneficiation. The mine operated
until 1992 when it was shut down by the company h
part due to continued releases of cyanide to the
environment The largest release, caused by pump
failures resulted in a cyanide laden contaminant
plume that killed fish for a distance of 17 miles in the
Alamosa River.
The acute toxicity of cyanide (inhalation or
ingestion of cyanide interferes with an
organism's oxygen metabolism and is lethal)
coupled with impacts from a number of major
incidents have focused attention on the use
of cyanide in the mining industry. Through
the 1980's, as cyanidation operations and
cyanide usage proliferated, incidents were
reported in which waterfowl died when using
tailings ponds or other cyanide-containing
solution ponds. In addition,  a number of
major spills occurred, including one in South
                Highlight 3-6
           Romanian Cyanide Spill

On January 31, 2000, a tailings dam failed at the
Aurul gold mine near the town of Bai Mare in
Romania.  The failure released approximately 3.5
million cubic feet of water contaminated with cyanide
and heavy metals into the the Szamos and Tizsa
Rivers in Romania,  Hungary, and Yugoslavia,
approximately SOOkms of river, before flowing into the
Danube, impacting approximately 1200 km of river.
The total fish kill was estimated at over 1000 metric
tons offish.

-------
                                          Chapter 3: Environmental Impacts from Mining 3-7
Carolina in 1990, when a dam failure resulted in the release of more than 10 million gallons of
cyanide solution, causing fish kills for nearly 50 miles downstream of the operation. Regulatory
authorities have responded by developing increasingly stringent regulations or non-mandatory
guidelines which address the design of facilities that use cyanide (e.g., liners), operational
concerns (e.g., monitoring, treatment), or closure/reclamation requirements.

Environmental Impacts.  Cyanide can cause three major types of potential environmental
impacts.

       Free-standing Cyanide Solution. Cyanide-containing ponds and ditches can present
       an acute hazard to wildlife and birds.  Tailings ponds may present similar hazards,
       although cyanide concentrations are typically much lower.  Rarely in the case of
       abandoned mines should acute cyanide toxicity be of concern.

       Release (i.e., spills) of Cyanide Solution.  Spills can result in cyanide reaching
       surface water or ground water and causing short-term (e.g., fish kills) or long-term (e.g.,
       contamination of drinking water) impacts.  Again, because cyanide solution is not
       typically present at abandoned mine sites in quantities large enough to release as a
       spill, this type of impact is unlikely at abandoned mine sites.

       Cyanide Leachate from  Process or Waste units. Cyanide in active heaps and ponds
       and in mining wastes (e.g., heaps and dumps of spent ore, tailings impoundments) may
       be released and present hazards to surface water or ground water.  In all but a few
       major cases, cyanide spills have been contained onsite,  and soils have provided
       significant attenuation in most cases. Cyanide may also increase the potential for
       metals to go  into solution and, therefore, be transported  to other locations.

In general, cyanide is not considered a significant environmental impact concern over the long
term for inactive or abandoned mines. If detoxification and reclamation are effectively
performed, most residual cyanide in closed heaps and impoundments will be strongly
complexed with iron. Although the stability of such complexes over long periods is not well
understood, cyanide is generally considered to be much  less of a long-term problem than acid
generation, metals mobility, and other types of environmental impacts.

Types of Cyanide.  Some basic knowledge of the different forms of cyanide is necessary to
understand regulatory standards and remediation activities. Cyanide concentrations are
generally measured  as one of the following four forms:

       Free Cyanide. Free cyanide  refers to the cyanide that is present in solution as CN or
       HCN and includes cyanide-bonded sodium, potassium, calcium, or magnesium (free
       cyanide is very difficult to measure except at high concentrations and its results are
       often unreliable, difficult to duplicate, or inaccurate).

       Weak Acid Dissociable (WAD) Cyanide. WAD cyanide is the fraction of cyanide that
       will volatilize  to HCN in a weak acid solution at a pH of 4.5.  WAD cyanide  includes free
       cyanide, simple cyanide, and weak cyanide complexes of zinc, cadmium, silver, copper,
       and nickel.

       Total Cyanide.  Total cyanide refers to all of the cyanide present in any form,  including
       iron, cobalt, and gold complexes.

       Cyanide Amenable to Chlorination (CATC).  CATC cyanide refers to the cyanide that
       is destroyed  by chlorination.  CATC is commonly used at water treatment plants.

-------
3-8 Chapter 3: Environmental Impacts from Mining
Free cyanide is extremely toxic to most organisms, and this form has been most frequently
regulated (i.e., EPA established a maximum contaminant level [MCL] under the Safe Drinking
Water Act and recommended an ambient water quality criterion for protection of freshwater
aquatic life under the Clean Water Act). Mining-related standards and guidelines developed
more recently by states often specify WAD cyanide, largely because of the difficulty in
measuring free cyanide at the low concentrations of regulatory concern.  Longer term
environmental concerns with cyanide, those not related to acute hazards  from spills, revolve
around the dissociation into toxic free cyanide of complexed cyanides in waste units and the
environment.  Unsaturated soils provide significant attenuation capacity for cyanide.  Within a
short time and distance, for example, free  cyanide  can volatilize to HCN if solutions are buffered
by the soil to a pH roughly below 8.  Adsorption,  precipitation, oxidation to cyanate, and
biodegradation can also attenuate free  cyanide in soils under appropriate conditions. WAD
cyanide behavior is similar to that of free, although  WAD cyanide  also can react with other
metals in soils to form
insoluble salts.
                                                        Highlights-?
                                                    The Bunker Hill Area

                                 The Bunker Hill Mining and Metallurgical Complex Superfund site is an
                                 example of a mining site affected by airborne pollutants. The complex
                                 includes the Bunker Hill Mine (lead and zinc), a milling and
                                 concentration operation, a lead smelter, a silver refinery, an electrolytic
                                 zinc plant, a phosphoric acid and phosphate fertilizer plant, sulfuric acid
                                 plants, and a cadmium plant. EPA has since demolished and capped
                                 the smelter complex. The major environmental problems at the Site
                                 were caused by smelter operations and mining and milling. The smelter
                                 discharged heavy metal particulates and gases, particularly sulphur
                                 dioxide, to the atmosphere. Prior to the I970's, recovery of heavy metal
                                 particulates, such as zinc and lead, was not required from smelter
                                 stacks. Instead, tons of metal particulates were emitted directlyfrom the
                                 stack into the atmosphere.  The lead and zinc plant stacks historically
                                 used baghouses and electrostatic precipatars to capture particulates for
                                 recovery of valuable metals. Because of a fire and subsequent
                                 problems with the baghouses, the plant continued to emit these
                                 particulates during the early-to-mid 1970's. Significant ecological
                                 damage has occurred in the areas surrounding the site. Soils near the
                                 smelting complex have been severely impacted by years of sulfur
                                 dioxide impact and  metals deposition. The hillsides around the smelter
                                 complex were denuded of vegetation due, in part, to the smelter and
                                 mining activity. In response, 3,200 acres of hillside have been
                                 replanted since 1990.
3.6    Air Emission and
Downwind Deposition

Particulate material (PM) and
gaseous emissions are
emitted during mining,
beneficiation, and mineral
processing (refer to Chapter 2
for details about mining
processes and associated
waste). Gaseous emissions
are generated by process
operations, primarily those
using heat to treat or convert
ores or concentrates  (e.g.,
roasting or smelting).
Generally, particulate
releases are flue dusts (e.g.
from sinter, roaster, smelter,
or refinery stacks) or fugitive
dust (e.g. from crushers,
tailings ponds, road use).

The remediation of impacts caused by gaseous and particulate emissions from process units
typically focuses on contaminated soils associated with downwind deposition.  At abandoned
mine sites, the processes that were the source of the emissions typically have either ceased
operation  or installed  air pollution controls, therefore continued deposition is unlikely.  Fugitive
dust may  still, however, be emitted from unstabilized waste management units and
contaminated sites or from transportation and remediation activities.

Gaseous Emissions.  Pyrometallurgical processes often generate gaseous emissions that are
controlled to some extent under current regulations. In the past, these gaseous releases were
typically not well controlled, and the emissions were blown downwind in the release plume.
Some  gaseous emissions, such as sulfur dioxide, affect the downwind environments through
acid precipitation or dry deposition. Metals such as zinc, arsenic, mercury and cadmium are
metals that will vaporize when heated in a pyrometallurgical process unit. In retort processing,
these metals are captured as gas, then condensed, and the metal processed for use.  In the

-------
                                          Chapter 3: Environmental Impacts from Mining 3-9
absence of capture and condensation, the gaseous metals are released and condensed
downwind from the release plume. Zinc released historically from smelters has had significant
impacts on downwind biota as it is phytotoxic at high concentrations.  Arsenic also has
significant impacts downwind, primarily on faunal receptors.

Particulate Emissions.  In the past, emissions from process operations, such as smelting and
roasting, were not well controlled  and, together with tailings deposition,  caused some of the
most widespread contamination.  Metal smelting, in the absence of adequate air pollution
controls, emitted particulates high in lead and other metal contaminants from smoke stacks that
would then settle out of the air stream.  Although  deposition at any distance may have been at a
relatively low concentration (particularly as stacks became higher), the long period of deposition
(i.e., from decades in some cases to over a century in others) and the biostability of metals
have created soil contamination problems of significant proportions.  With the advent of air
pollution regulations and subsequent air pollution controls (ARC), smelter flue residues were
deposited onsite in waste piles or landfills. These wastes often  have high metal concentrations,
high enough that, when technically feasible, the dusts may be returned  to the smelter to recover
the metal value.

Fugitive Dust. Fugitive  dust is produced from mining operations (e.g., blasting), transportation
(e.g., loading equipment, haul vehicles, conveyors), comminution (e.g., crushing and grinding),
and waste management  operations (i.e., waste rock dumping).  Wind also entrains dust from
dumps and spoil piles, roads, tailings, and other disturbed areas.  Dust  problems from tailings,
in particular, may not appear until after closure/abandonment, when the waste material dries
out. Only then may  high levels of metals (arsenic, for example) trigger concerns. Tailings and
waste rock at metal  mines usually contain trace concentrations of heavy metals that may  be
released as fugitive  dust to contaminate areas downwind as coarse particles settle out of
suspension in the air. Stabilization and reclamation efforts are aimed in part at reducing fugitive
dust emissions; remediation often must address the downwind soil contamination.
3.7    Physical Impacts from Mine and Waste Management Units

Mine structures and waste management units pose a unique set of problems for a site manager
in planning and conducting remediations at mine sites. Structural problems with the waste units
and the mines must be considered from a  perspective of both ensuring the safety of
remediation workers and alleviating environmental impacts that would result from structural
failure and a subsequent release of contaminants.

Slope Failure.  Slopes at mine sites fall into two categories:  cut slopes and manufactured or
filled slopes.  The methods of slope formation reflect the hazards associated with each.  Cut
slopes are created by the removal  of overburden and/or ore which results in the creation of or
alteration to the surface slope of undisturbed native materials.  Changes to an existing slope
may create environmental problems associated with increased erosion, rapid runoff, changes in
wildlife patterns and the exposure of potentially reactive natural materials.  Dumping or piling of
overburden, tailings, waste rock or other materials creates manufactured or filled slopes.
These materials can be toxic, acid  forming, or reactive.  Slope failure can result in direct release
or direct exposure of these materials to the surrounding environment.  Saturation of waste
material can also trigger slope failure.

Structural Stability of Tailings Impoundments.  The most common method of tailings
disposal is placement of tailings slurry in impoundments formed behind raised embankments.
Modern tailings impoundments are engineered structures that serve the  dual functions of
permanent disposal of the tailings and conservation of water for use in the mine and mill.
Today, many tailings impoundments are lined to prevent seepage, this is rarely the case at

-------
3-10 Chapter 3: Environmental Impacts from Mining
historic mine sites. In addition, modern tailings impoundments are designed to accommodate
earthquake acceleration.

The historic disposal  of tailings behind earthen dams and embankments raises a number of
concerns related to the stability of the units. In particular, tailings impoundments are nearly
always accompanied  by unavoidable and often necessary seepage of mill effluent through or
beneath the dam structure.  Such seepage results from the uncontrolled percolation of stored
water or precipitation downward through foundation materials or through the embankment.
Failure to maintain hydrostatic pressure within and behind the embankment below critical levels
may result in partial or complete failure of the structure, causing releases of tailings and
contained mill effluent to surrounding areas.  Since most modern mines recycle waste from
impoundments back to the process, the cessation of this recycling at the closure/abandonment
has to be accompanied by other means to maintain safe  levels of hydrostatic pressure.

Structural stability depends on the physical characteristics of the waste material (e.g., percent
slimes vs. sands in impoundments), the physical configuration of the waste unit, and site
conditions (e.g., timing and nature of precipitation, upstream/uphill area that will provide
inflows).

Subsidence. Mining subsidence is the movement of the surface resulting  from the collapse of
overlying strata into mine voids. The potential for subsidence exists for all  forms of
underground mining.  Subsidence may manifest itself in the form of sinkholes or troughs.
Sinkholes are usually associated with the collapse of a portion of a mine void (such as a room
in room and pillar mining); the extent of the surface disturbance is usually limited in size.
Troughs are formed from the subsidence of large portions of the underground void and typically
occur over areas where most of the resource has been removed.

Effects of subsidence may or may not be visible from the ground surface.  Sinkholes or
depressions in the landscape interrupt surface water drainage patterns; ponds and streams
may be drained or channels may be redirected. Farmland can be affected to the point that
equipment cannot conduct surface preparation activities; irrigation systems and drainage tiles
may be disrupted.  In developed areas, subsidence has the potential to affect building
foundations and walls, highways, and pipelines. However, metal mines are often located in
remote areas where there is a lack of development, minimizing this risk.  Subsidence can
contribute to increased infiltration  to underground mines,  potentially resulting  in increased AMD
generation  and a need forgreater water treatment capacity in instances  where mine drainage
must be treated. Ground water flow may be interrupted as impermeable strata break down and
could  result in flooding of the mine voids.  Impacts to ground water include changes in water
quality and  flow patterns (including surface water recharge).

Structures. Structures at mining and mineral processing sites can be a physical hazard for
investigative and remediation workers and contain quantities of contaminates.  For example,
buildings at many mining and mineral processing sites were just shut down when the facility
stopped production with the hope that production would be restarted. Because of this many
buildings may contain both chemicals used in the process in containers that are no longer intact
or quantities of material, such as flue dust or feed product that contain high concentrations of
contaminates.  In addition to the materials contained in the structure, the structure may be
unsafe due to time, weather, and  the exposures that occurred during operations, such as the
heat of a smelting operations or acid spills from an acid plant.

Mine  Openings.  Mine openings, both horizontal and vertical, can be a significant physical
hazard at an abandoned mine site.  In many cases the openings are well known and are a
threat to the general  population, since the adventurous want to enter them and explore.  These
mine openings may harbor an number of physical hazards that can injure or kill those who

-------
                                         Chapter 3: Environmental Impacts from Mining 3-11
enter, including unstable ground that could collapse or bad air, either insufficient oxygen or
containing poisonous gases, such as carbon monoxide.  The other physical hazard from mine
openings are those that are unknown, particularly vertical shafts. If the opening has been
covered, either by an old collapsed building or vegetation, they may pose the threat of falling,
sometimes hundreds of feet, to individuals or wildlife who may get to close to the obscured
opening.
3.8    Sources of Additional Information

To more fully understand the broad environmental impacts found at mining and mineral
processing sites that are on the NPL see Appendix C - Mining Sites on the NPL.  Appendix B
provides further discussion of acid rock discharge (ARD) and acid mine discharge (AMD)
including an annotated bibliography.

-------
3-12 Chapter 3: Environmental Impacts from Mining
                           (This Page intentionally left blank)

-------
                                     Chapter 4
                  Setting Goals and Measuring Success
4.1    Introduction

This chapter outlines considerations in setting goals for mine site cleanup and in assessing the
success of mine site cleanup initiatives. It covers the coordination between federal and state
agencies in determining the goals that need to be met and resolving conflicts between different
goals  in different agencies.  The chapter further discusses how a site manager can "measure"
the success of meeting the goals that were set for the site.
4.2    National and Regional Goals.

Mining activities have been an integral part of the economy and culture of our nation since the
mid-1800's.  Mining and mineral beneficiation operations continue today at numerous locations,
largely under the auspices and environmental control of State regulatory agencies and the
purview of federal land managing agencies (EPA National Hardrock Mining Framework, 1997).
The largest mining-associated environmental response task faced by governmental agencies
today involves the tens of thousands of abandoned mine sites which stem from the intense
mining and industrial development activities that occurred largely between the  1860's and post-
World War II. Since the early 1970's a broad mix of EPA, state and federal natural resource
and land managing agencies have been involved in addressing threats to human health and the
environment at a variety of sites where hardrock mining, milling  and  smelting activities have
occurred.

Under the auspices of the Superfund program, states and EPA began to address a number of
the largest and most environmentally serious sites (e.g., Bunker Hill, ID; Butte-Silver Bow
Creek, MT; California Gulch-Leadville, CO; Iron Mountain, CA). Many of these sites were
slated for cleanup because the presence of toxic levels of heavy-metal residues generated by
mining and industrial operations were a health threat, not only to significant population centers,
but were also severely impacting the surrounding watersheds and drainages where cold-water
fishery resources are highly valued aspects of recreation and tourism.

In addition to the NPL-site activities overthe past one and a half decades, site assessment  and
inventorying efforts by states, federal  land managing agendes and the EPA continue to identify
abandoned mine sites and features consisting of smaller smelter and milling operations,
draining mine adits, impounded and alluvial tailings, waste rock piles, and related contaminated
stream reaches.  Comprehensive information has not yet been compiled to completely
ascertain the nature and extent of the environmental problems posed by abandoned mine sites,
but information is being assembled and reviewed by involved agencies and impact indicators
are emerging.  Historical databases such as the Minerals Availability System and Mining
Industry Locator System compiled by the former U.S. Bureau of Mines, now maintained by the
U.S. Geological Survey, as well as water quality assessment reports conducted by states under
the Clean  Water Act indicate the presence of more than 200,000 abandoned mine sites located
within hundreds of watersheds affecting hundreds of miles of streams and fisheries throughout
the western U.S. While comprehensive qualitative and quantitative  abandoned mine sites site
data and impact information is not yet  available, experienced professionals estimate, based on
inventory efforts, remediation studies,  cleanup activities and experience to date, that  less than
ten percent (10%) of the sites that were actively mined are expected to cause  significant
adverse impacts to riparian zones and aquatic habitats of receiving  streams.  Determining
which sites are the significant sources of metal-leachates and understanding the range of

-------
4-2 Chapter 4: Setting Goals and Measuring Success
impacts, as well as judging the relative priority, need and basis for response activity, will be an
important aspect of goal-setting for abandoned mine site work at state and local levels.

Under a variety of  land management and environmental protection statutes at the federal level,
the U.S. Department of the Interior (through the Bureau of Land Management, the Bureau of
Indian Affairs, the Fish and Wildlife Service, and the Geological Survey), the U.S. Department
of Agriculture (through the Forest Service, and the Natural Resource Conservation Service), the
Environmental Protection Agency, and the U.S. Army Corps of Engineers have significant
responsibilities in coordinating and implementing the activities necessary to accomplish
environmental response to the abandoned mine site problem  across the country. States also
play a major role in managing releases from abandoned mine sites through implementation of
federally delegated programs or specific state authorities. The programs and budgets these
federal agencies bring to bear on  the abandoned mine site activities will largely occur through
the regional, state and local offices and staffs of the agencies. This will enable and assure that
as environmental response planning and remediation projects occur, they are done in close
collaboration with state and  local governments, and meet the  goals and needs of the states and
local areas.
4.3 State and Local Goals

While the Environmental Protection Agency, the Department of Interior, and the Department of
Agriculture work to coordinate their respective efforts, dialogue with state natural resource
agencies and local governments needs to be constantly focused on projects which provide the
earliest and most tangible environmental  benefits to ecosystems and communities. Under the
auspices of EPA's National Hardrock Mining Framework policies, EPA regional offices will be
participating in discussions between federal, state and local governments to understand the
needs, priorities and objectives of abandoned mine sites activities within states and at particular
localities and watersheds. These discussions will focus attention on short-term and long-term
needs for addressing human-health and ecosystem issues, including adverse impacts to:

•      Homesite and municipal water supplies,
•      Aquatic  resources and improvements,
       Recreational uses and improvements,
•      Agricultural water users,
       Industrial water users,
•      Residences,
       Workers, and
       Wildlife.

4.3.1  Human Health Impacts

Completion of the current NPL-listed sites will have addressed the most serious human health
threats at population centers.  However, rising populations and urbanization (both residential
and commercial) underway throughout the western  U.S. brings new concerns about mine waste
exposures to new residents, workers,  and recreational users as land redevelopment occurs.
States and local governments are becoming increasingly concerned about human health
impacts derived from locally-impacted headwater aquifers which are being utilized as well-water
sources for mountain homesites, metal-contaminated surface waters which serve as municipal
water supplies for larger population centers, new development of commercial/industrial sites, as
well as the increased frequency of direct exposures to metal-laden mining residues as people
use these sites and watersheds during recreational activities.

-------
                                        Chapter 4: Setting Goals and Measu ring Success 4-3
4.3.2  Environmental Impacts

As mentioned above, much of the concern with abandoned mine sites impacts are related to
recreation and fishery resources and downstream agricultural activities. Abandoned mine sites
studies and response actions can occur in the context of drainage basins and watersheds,
beginning in the uppermost and often alpine headwaters, extending through lower reaches of
valley floodplains, and continuing down into mainstem river drainages where agricultural lands
and municipal-industrial users occur.  Water quality standards which have been developed by
states are the initial targets for meeting clean water objectives; however, in some cases
protecting human health and meeting environmental improvement goals can mean going
beyond established standards.  The process of making these decisions requires considerable
input and can result in a very dynamic and sometimes contentious debate and dialogue
between a variety of resource users and stakeholders.  The values and choices of each of
these stakeholders is a very important and necessary part of the goal-setting and decision-
making process as determinations regarding  the merits, cost-effectiveness and implementing of
studies and remediation are made.

4.3.3  Getting it Done

An excellent publication is available to support goal-setting efforts, entitled "Watershed
Partnerships: A Strategic Guide for Local Conservation Efforts in the West," prepared for the
Western Governors Association, 1997. The report states:

       Watersheds serve as a useful unit of focus for a number of reasons.  They can be
       aggregated to include large streams and even  major rivers or separated into small, local
       areas.  A watershed is a natural integrator of issues, values, and concerns which are
       clear to see as the stream flows along its course. It exhibits clear evidence of
       consequences.

       Watersheds are a good  starting point for people to understand the relationship of
       people and natural resources in a management system.  The current institutional
       boundaries are generally mismatched to the hydrologic, ecologic, geographic, and
       economic scope of natural  resource problems and  the affected  communities and
       interests.   Watershed partnerships can  help match  societal interests to the resource
       base. Over time, watersheds enhance participants' shared knowledge to increase the
       collective competence for anticipated  and responding to  changes in resource goals...
       By working together, everyone with an interest in the watershed can solve problems,
       ensuring  healthy land and water.  Typically, partners represent wide interests: local
       communities, various groups, and government agencies.

The  report was developed to serve existing as well as new and emerging partnerships.  The
report includes "collective wisdom from those who have pioneered watershed partnership
concepts" and addresses areas of interest in the following sections:

       Foundations for Getting Started,
•      How to organize
       What to Think About - Sooner or Later
•      External Factors

-------
4-4 Chapter 4: Setting Goals and Measuring Success
4.3.4  Values and Choices

Indirectly, processes for decision-making about what abandoned mine site work to address
already have been underway for some time.  Under the Clean Water Act (CWA), state water
quality regulatory programs have established stream classifications and use attainability
designations for most waterways. Accompanying these stream use and classifications are
water quality standards that establish the goals and requirements for contaminant
concentrations. The CWA also requires the development of Total Maximum Daily Load (TMDL)
calculations to meet water quality standards where ongoing impairments are occurring. Similar
regulatory procedures and standards exist for air, soil, and groundwater contamination. At NPL
sites where CERCLA responses are occurring, not only do projects strive to meet the above
regulatory standards (referred to as Applicable or Relevant and Appropriate Requirements, or
ARARs), but also site-specific data is used in risk assessments to formulate risk estimates.
Subsequent deanup and remediation decisions are based on selected levels of human health
and environmental risk  reduction. Whether associated with CERCLA actions or other
regulatory and non-regulatory activities occurring in watersheds, agencies and programs
undertake a process of reassessing and modifying existing environmental standards.

Modifications to the above "regulatory processes" take considerable effort and are time-
consuming.  While these regulatory processes will need to be engaged to varying degrees,
these are probably not the most efficient or productive forums through which Federal and State
agencies and local governments should work to make the strategic environmental response
priorities and decisions  for the universe of abandoned mine sites at watershed and drainage-
basin levels.

As mentioned earlier, collaborative watershed partnerships are more likely to be an effective
sounding board for determining the values and  choices which will focus abandoned mine site
efforts. Closely related  to the WGA watershed partnership strategy mentioned earlier, EPA
strives to accomplish its efforts through a "Data Quality Objectives Process." The data quality
objectives (DQO) process is a systematic planning effort for ensuring that environmental data
will be adequate for their intended use.  This  process is key to abandoned mine site work in
order to integrate the desired goals and objectives with information appropriate for the
necessary decisions, and lastly the ability to measure success towards established goals.
These discussions and  activities will provide an adequate foundation for planning and making
defensible abandoned mine site project decisions, and will also provide a basis for measuring
success.
4.4    Measuring Success

Much has been said above about establishing national, regional, state, tribal and local goals.
The planning and communication described above establish a basis for determining degrees of
progress towards the stated goals and a means to identify techniques that will be used to know
when the objectives have been met.  These results and value-added measurements can
include a variety of discrete indicators, including:

•      Number of sites or acres that have been addressed,
       How many sources or volume of contaminated media have been remediated,
•      Water quality measurements,
       Biological or aquatic lexicological indicators, and
•      Budget or schedule compliance.

-------
                                       Chapter 4: Setting Goals and Measu ring Success 4-5
4.5    Sources of Additional Information

For additional information on setting goals and measuring success at mining and mineral
processing sites, see the following documents:

       USEPA, OSW.  9-97.  EPA's National Hardrock Mining Framework.  EPA 833-B-97-003

•       Western Governors'Association.  2-97. Watershed Partnerships: a Strategic Guide for
       Local Conservation Efforts in the West

       Western Governors'Association. 1998. Abandoned Mine Cleanup in the West: A
       Partnership Report (1998)

-------
4-6 Chapter 4: Setting Goals and Measuring Success
                           (This page intentionally left blank)

-------
                                      Chapter 5
                            Community Involvement
5.1    Introduction

The purpose of this chapter is to discuss community involvement planning for restoration and
cleanup work at mine waste sites. Community involvement planning should parallel all aspects
of the site cleanup process from the onset of scoping to conclusion of site work.  While the
relevant public participation  requirements of the statutes under which the cleanup is taking
place must be met, these activities represent only a starting point for community  involvement at
many sites.  Additional guidance on Superfund community involvement requirements and other
community involvement activities can  be found in the Superfund Community Involvement
Handbook & Toolkit1.  This chapter presents the role of community involvement based on a
Superfund site, however the information and issues presented here are also relevant at a non-
Superfund mining site.
5.2     Considerations for Community Involvement at Mine Waste Sites

While every community is unique, there are circumstances at many mine waste sites that may
require special consideration when planning community involvement. This section will discuss
these considerations and suggest community involvement approaches for them.

5.2.1  Community Values and Culture
It is important for the site team to learn about
the communities that will be affected by the
site cleanup since the values and unique
culture of each community impact how area
residents react to cleanup efforts.  Residents
in  many communities located near mine
waste sites either are currently mining as an
occupation or have ties to mining.  They are
proud of their mining heritage. They may
view mine wastes not as eyesores or sources
of risk, but as signs of economic vitality—a
reminder of the "good old days".   Relics of
mining—tailings piles and ponds, waste rock
piles, cribbing,  drainage tunnels-are
considered valuable historical features.
               Highlight 5-1
            Butte and Walkerville

The Butte Area portion of the Silver Bow Creek/Butte
Area site was added to the NPL in 1987. The people
of Butte were extremely unhappy about Butte and
Walkerville being listed on the NPL. One ofthe
residents' main concerns was that EPA would
conduct years of study and they would see no action.
Residents believe that EPA comes into a community
and states that there are potential health concerns
posed by the presence of heavy metals in residential
areas and then studies the site for several years. The
people ofthe community, especially parents, are
thrown into denial and angry stages ofthe "grieving"
process. However, as EPA conducts the studies and
remediation, particularly expedited response actions,
the communities concerns are reduced and they
begin to cooperate with the Agency and a partnership
between the Agency and the residents can develop.
Residents in mining communities, like the
residents in many other communities, are
reluctant to trust agencies and individuals
that they are unfamiliar with.  It is important
to establish contact with local government and community groups as early as possible and to
maintain clear and candid communications.
  'U.S. Environmental Protecfon Agency (EPA), December 1998. Superfund Community Involvement Handbook and Toolkit.
Washington, D.C. Office of Emergency and Remedial Response.

-------
5-2   Chapter 5: Community Involvement
Community Involvement Tips:

These tips presented in this chapter are important to all communities, whether or not the site is
a Superfund site.  Following these tips will help alleviate the community's concerns about any
economic impacts.

Know and Respect the Community.   There is no substitute for knowing the community.
Rather than taking an inflexible stance that will increase public alienation, the team should
focus on joint problem-solving with the community.   Spend time in the community so residents
get to know team members.  Interview residents. Identify the formal and informal opinion-
shapers in the community and pay special attention to them. Appreciate the community's
heritage. Recognize the mining industry's importance to the community and the nation. One
RPM said, "I have memorized the names of all the local mines and read books about local
mining history.  I've learned the lingo and even joined 'Women in Mining'."

Establish an Ongoing, Accessible EPA Presence. Because these sites frequently are
located in areas distant from the  EPA regional office, serious consideration should be given to
providing for an ongoing  EPA presence in the community. At some sites EPA has staffed an
office so that it is easily accessible to area residents.

Maintain Ongoing Communication. While no amount of good communication can makeup
for poor technical decisions and project management, communication can prevent
misunderstandings and build credibility when the technical and management dedsions are
sound.  Early, accurate, balanced, and frequent two-way communication should be planned.
The site team can benefit from the good will and credibility generated by frequent contact, by
the same site manager and other team members, with the community groups, task forces, and
individual residents.  Generally, one-to-one and small group discussions work best in small
mining communities.  While it is vital to work with local  elected officials, it is also important to
identify and communicate through the community's informal  networks using unofficial
community caretakers and opinion-makers. It takes time to identify the networks and the
caretakers that are at their hub, but communicating through these sources is often  more
effective than through more formal efforts.

Pay Special Attention to Historic Preservation Concerns. Involve the community from the
onset in designing the historic preservation plan. Encourage them to participate in  historic
resource surveys and to prioritize the historic resources identified. Tailor cleanup plans, to the
extent possible, to preserving priority historic resources.

Empower the Community; Use Local Expertise.  In most  communities there is a vast
untapped resource of knowledge. Former miners know a great deal about the geology,
hydrology and historic mining practices  in the area.  Staff can profit from this expertise and
should encourage the local community to take advantage of its own experts.  At some sites,
local representatives help agency staff design and implement sampling and  monitoring  plans.

Involve the  Community in Planning and Implementing the Cleanup.  At NPL listed sites,
encourage residents to apply for a Technical Assistance Grant (TAG). At non-Superfund  sites,
stakeholder groups might apply for grants like the Regional Geographic Initiative to help fund
community-based participation.  Technical Outreach Services for Communities (TOSC) is also
available for non-Superfund sites. Some communities form Community Advisory Groups  (CAG)
that take an  active role in deciding whether and how wastes  in the area should be addressed.  It
is important that EPA demonstrate its willingness to share control with local groups and be
responsive to recommendations from these groups. This is the heart of community-based
environmental decision-making.  At many sites, staff meet regularly with stakeholder groups

-------
                                                  Chapter 5: Community Involvement   5-3
that include representatives from the community, PRPs, state, EPA and other stakeholders to
discuss site plans and reach informal consensus on them.

Conduct a Demonstration Project. The team should consider a demonstration project in
cases where the EPA is proposing soil remediation in residential areas.  Residential cleanups
are intrusive.  Lawns are torn up, trees are leveled, and prized flowers and gardens are
uprooted.  Property owners' fears about the disruptive nature of the project sometimes are even
greater than the reality. They worry about the dust, mud, noise, and mess that the construction
will create.  They fear that the end result will be a barren yard.  Often a small scale
demonstration can calm some of these fears.  Such a trial run may also result in lessons that
can be applied to the full scale cleanup.

Encourage Neighbors to Mentor Neighbors. As residential soil cleanups progress,
encourage residents whose properties have been cleaned up to serve as mentors to
homeowners whose properties are slated for remediation.
5.3  Risk Perception

At some sites the perceived contradiction between EPA's assessment of a site's potential risk
and health tests, like blood lead tests, causes area residents to be skeptical of EPA's
contention that mining and mineral processing sites pose a threat to human health. These
wastes are familiar, they have been around for years and, in some cases, there is no visible
evidence of negative health effects in the community. Yet, EPA risk assessments indicate the
wastes pose a potential threat.  The use of a computer model instead of blood lead tests for
determining the need for remediation is unacceptable to some communities.  Residents
contend that EPA refuses to consider real concrete evidence and,  instead, focuses on
theoretical abstractions based on assumptions and uncertainty.  Sometimes citizens argue  that
the proposed cleanup will  pose more of a health threat than leaving the soil or wastes
undisturbed.

Community Involvement Tips:

Use  Skilled  Risk Communicators. Good risk communication is especially important at mining
sites. Site staff should be trained risk communicators.

Provide Early Metals-Awareness Education.  It is important to inform citizens of precautions
to take in order to reduce  exposure to metals, particularly if it will be many years before a
cleanup takes place. It is  necessary to take measures to protect the public health and to
demonstrate the agency's commitment to reducing health risks for the local community.
Providing  metals-awareness education to local health professionals, educators, day care
providers and parents will both help reduce exposure and remind citizens that mine wastes may
be a potential threat to health. Educational efforts may include workshops, seminars for college
credit, parent-teacher meetings, distribution of flyers to parents and coloring books to children.
At one site, a day-care facility teacher developed a song about being safe around lead and
taught it to the children.

Work with Local Health  Officials. EPA should encourage local health departments, health
professionals, and educators to take the lead in  educating the community about site risks.  In
fact,  EPA should collaborate wherever possible with local and state environmental officials.
EPA can assist the effort by providing both general and site-specific information. However, it is
best  if local health professionals actually design  the program and disseminate the information.

-------
5-4  Chapter 5: Community Involvement
Reduce Immediate Risks. Because the Superfund process can take a long time at large and
complicated sites, the time between identification of risk and actual cleanup may be several
years.  To deal with the perception that the risk is not real because EPA is slow to begin action
and to reduce immediate health threats, the team should consider some interim actions such as
removals, interim remedial actions, or other expedited cleanups to show tangible results.
Removals have been very effectively used at some of the large mining sites in Montana and
Idaho.

Involve the Community in Assessing Site Risks. Local residents should help design risk
assessments-especially exposure scenarios. They know how their lives might bring them in
contact with mine wastes. Local land use plans may  help predict future uses of property where
mine wastes are located. Exposure scenarios must reflect reality or the community will reject
the conclusions of the risk assessment.  If health studies have been conducted in the
community, relate them to the risk assessment. There are many communication tools that may
help explain how risk assessments work including workshops,  fact sheets, and presentations to
TAG or TOSC groups or CAGs.
5.4  Liability

Fear of liability under the Clean Water Act may prevent stakeholders who are not legally
responsible for cleaning up an abandoned mine waste site including governmental entities
("Good Samaritans") from volunteering to participate in discussions or undertake cleanup
activities that will provide incremental improvements in water quality.  They fear that if their
cleanup actions do not result in water quality that meets Clean Water Act standards, they will be
held liable.  While there is not a legislative remedy for this concern today, the Western
Governors' Association is working with Congress on amendments to the Clean Water Act that
will address the concern.

There may be Superfund liability concerns at mining and mineral processing sites.  The law
holds those who generated the wastes potentially liable for cleanup costs.  At mining and
mineral  processing sites, however, many of the generators of historic wastes cannot be located.
EPA may pursue mining companies that operated the mine in the past as well as the mining
company that currently operates the mine, that may be a major employer in the area, for
cleanup costs. This may not seem fair to local residents.

The uncertainty of who will be responsible for cleanup costs weighs  heavily on communities.
Because entire communities may be within the site boundaries, owners of small businesses and
small mining claims may fall within the broad Superfund definition of PRP because they are the
current owners of contaminated property. Local governments may own contaminated land or,
as is the case at some sites, may have moved or used mining and mineral processing wastes,
thus incurring potential liability.

Homeowners may fear that they will be liable for the costs of cleaning up contaminated soils on
their property or ground water under it. Lenders may  be reluctant to make loans for fear that if
they foreclose and take over the property, they will be responsible for cleaning it up.  It is
prudent to address these concerns up-front.

Community Involvement Tips:

Resolve Liability Quickly.  It helps if EPA can resolve the  liability question early. Settle as
soon as possible with small waste contributors.  Let small mining claim owners and owners of
contaminated property who did not cause the contamination know where they stand at the
onset. The use of prospective purchaser agreements should be considered so that economic
activity can continue.

-------
                                                  Chapter 5: Community Involvement   5-5
Address Property Concerns.  It is important that project staff be sensitive to the community's
liability concerns and take steps to respond quickly to darify liability issues as they arise.
Information should be provided to local realtors and lenders describing the deanup process,
lender responsibilities and protections, and EPA's ground-water and residential property owner
policies.  Staff will need to work with the lending and real estate community at each site to
identify the best ways to address concerns about property values and liability. The team may
want to consider workshops and/or clearly written fact sheets to explain liability issues,
precautions to take before proceeding with property transactions, and options for dealing with
contaminated property in property transactions. At some sites, EPA has used 'comfort letters'
to ease liability concerns.
5.5    Economic Impacts

Superfund frequently is viewed as a threat to the community's economic well-being.  If EPA has
named a major employer as a PRP, this contributes to economic concerns. Citizens fear that
the additional burden of Superfund may force the company out of business. Current mining
and mineral processing activities may, in fact, be hindered. Companies may be reluctant to
acquire mining claims and  initiate new mining and reprocessing ventures because of the fear of
liability.
Many mining and mineral processing sites
are abandoned facilities which have been                 _..   .,   .......
 ,      . ,         T-,    ..   .-    ^    _t   ,               Silver Mountain Ski Area
dormant for years.  The attention Superfund
                                                            Highlight 5-2
                                             The community of Kellogg, ID, wanted to develop a
                                             gondola base for the Silver Mountain Ski area within
                                             the boundaries of the Bunker Hill Superfund site. The
                                             community was concerned about any future liabilities
                                             they may incur because of theireconomic
                                             development action for the ski area.  EPA negotiated
                                             a prospective purchaser agreement with the
                                             community that limited their liability and helped
                                             facilitate economic development with the Superfund
                                             site.
brings to them may cause both perceived
and real economic concerns to a currently
thriving community.  The perceived stigma
may stifle economic growth in a number of
ways. Contaminated property may not be
desirable for further business development.
Banks may be reluctant to lend money for
development of such properties because of
liability concerns.  Federal home mortgage
and lending agencies such as the
Department of Housing and Urban Development (HUD) and Fannie Mae also may be cautious
making loans on contaminated property, contributing to a drop in property values.  Proposed
cleanup actions may threaten the historic mining features of the area, thus jeopardizing efforts
to encourage tourism, a fledgling industry in mining areas.  These economic concerns
sometimes outweigh EPA's claim that the ultimate remediation of contamination will result in
economic benefit to the community in the future by improving property values and eliminating
threats to waterways and other scenic areas.

Economic concerns can easily become the focus of a great deal of tension between site
remediation teams and the local community.  Recognizing and attempting to address  economic
concerns can be crucial to carrying out remedial activities.  In many communities the concerns
identified above have been addressed by EPA and communities have been able to function
normally, notwithstanding Superfund concerns, but it takes work and commitment by  EPA and
the local community.

-------
5-6  Chapter 5: Community Involvement
Community Involvement Tips:

Use Local Businesses Where Possible. EPA can help local workers get the OSHA 40-hour
Health and Safety at Hazardous Waste Sites training and can show local businesses how to bid
on Superfund contracts if they are not already familiar with the procedure. At some sites
proposed work has been divided up into smaller contracts so that local business can bid
competitively on the work.

Explore Partial Deletions from the National Priorities List (NPL).  EPA policy allows sites,
or portions of sites that meet the standard provided in the NCP (i.e., no further response is
appropriate), to be the subject of entire or partial deletion from the NPL (60 FR 55466). A
portion of a site to be deleted may be a defined geographic unit of the site, perhaps as small  as
a residential unit, or may be a specific medium at the site such as ground water, depending on
the nature or extent of the release(s). To reduce the site-wide Superfund "stigma," properties
within the Superfund site that are known to be free of contamination should be publicly
identified.

Resolve Land Use  Issues.  EPA's Brownfield's  Initiative provides mechanisms for removing
some of the barriers to economic redevelopment. EPA staff should work with the community to
address and resolve future land  use  issues as early as possible so that cleanup plans can  be
tailored to the projected future land use.2 Prospective purchaser agreements may be beneficial
both to those who are interested in redeveloping the property and to EPA.3

Establish a Process for Responding Realtors and Lenders.  Identify a contact person who
will respond to inquiries from realtors and lenders about specific properties. Whenever
possible,  provide comfort letters to property owners whose property has been cleaned up  or
will not require remediation.  Negotiate prospective purchaser agreements with buyers who are
willing to undertake  cleanup work. These activities take time but the return in community good
will is worth it.
5.6    Fiscal Impacts on Local Government

A cleanup may put spedal strains on the budget of local government. Reduced assessed
property valuations lead to decreased property taxes and reduced local government revenues,
while cleanup activities may necessitate the expenditure of local dollars for such things as
street repairs, street cleaning, and institutional controls.  Institutional controls such as land use
restrictions are frequently a component of remedies at mining and mineral processing sites.
These restrictions may affect the marketability of local properties.  Institutional controls may
also place limits on excavations, require maintenance of grass cover, etc. Such land use
restrictions require long-term public education.  Local governments may balk at being
responsible for this long-term outreach.

Community Involvement Tips:

Set Up a Trust Fund.  At some sites, EPA has required the company responsible for the
cleanup to establish a trust fund for long-term monitoring and outreach.  At other sites, the
agencies have helped establish trust funds to aid the local government.
  2 See OSWER Directive 9355.7-04, May, 1995. "Land Use in the CERCLA Remedy Selection Process."

  3 U. S. Environmental Protection Agency (EPA), June, 1989. Guidance on Landowner Liability Under Section 107(a)(1) of
CERCLA, De Minimis Settlements Under Section 122(g)(l)(b) of CERCLA, and Settlements with Prospective Purchasers of
Contaminated Properties.

-------
                                                  Chapter 5: Community Involvement   5-7
Identify Opportunities for Cleanup to Benefit Local Government. At some sites, agency-
generated Geographic Information Systems (GIS) data can also provide maps and other
information that local government can use for land use planning and property assessment
purposes. Aerial surveys used for cleanup planning have also been useful to local
governments and other stakeholders for purposes unrelated to the cleanup. At one site where
the cleanup called for capping mine wastes, a portion of the cap was used for an asphalt
bicycle trail and another section will be a city-maintained sledding hill.

Meet the Political Needs of Local Officials.  Small communities expect that their local
officials will look after their interests.  Local officials feel a responsibility for and receive political
benefit from close oversight of agency work. Staff must remember to keep local officials
informed and involved throughout the cleanup process.
5.7    Federal Land Managers

Many abandoned mine waste sites are located on federal lands or a mixture of federal and
private lands—Forest Service, Bureau of Land Management, National Park Service, U.S Fish
and Wildlife Service. When this is the case, federal land managers will be important players in
the cleanup process. Sometimes, in fact, they will be the lead agency responsible for
overseeing all or a portion of the cleanup using CERCLA authority.  In other cases, they may be
liable for some of the cleanup work. In still other cases, they are the trustees for natural
resources.  Multiplicity of roles for multiple agencies may cause confusion in the community
unless there is a close working relationship among the federal agencies involved at the site and
each agency's role is carefully explained.  To gain a better understanding of the authority of
land  managing agencies and EPA under CERCLA read Executive Orders 12580 and 13016.

Community Involvement Tips:

Involve Stakeholders in Decisions on the Cleanup Process. When a wide range of options
are available for addressing the cleanup—different laws, different agencies taking the lead, a
combination of private and public responsibilities, etc.-it is important to carefully explain the
options and involve the community in the decisions on the cleanup plan.

Clarify Agencies' Roles. Carefully explain the role each federal agency will play at each step
in the process.

Include Federal Land Managers in Stakeholder Groups. If a stakeholder advisory group is
formed, include federal land managers in the group.
5.8    Uncertainty

The cleanup process can be slow and it may take some time before there is evidence of actual
cleanup. Because property values and marketability are sometimes affected, residents want to
know whether their properties are in or out of the site boundaries.  EPA is frequently unable to
give an answer to this question until studies are complete and all data are available.

Citizens want to know if their property will require remediation.  They feel they must defer
decisions on remodeling, landscaping, gardening, and other activities  until they know whether
their property is contaminated or when it will be remediated.  Again, EPA may not have an
immediate answer to their questions. This increases the sense of uncertainty and frustration of
the local community.

-------
5-8  Chapter 5: Community Involvement
Community Involvement Tips:

Establish Site Boundaries Early. While making it clear that new information may change the
boundaries, the team should clearly describe the areas that are under investigation and should
provide information on the location of contaminated areas. When information is not available,
residents should be told when it will be collected and made public.

Identify and Reduce Areas of Uncertainty. Staff should  clearly identify areas of uncertainty,
whether it be extent of contamination, nature of cleanup planned, site risks or liability. They
should explain how and when uncertainties will be resolved and immediately communicate new
information that will remove uncertainty.  Where uncertainties remain, the site team should
explain how cleanup plans  will be adjusted to take the uncertainties into account.
5.9    Additional Sources of Information

Additional information concerning EPA's Superfund community involvement programs, including
a list of publications available can be found on the EPA website at:
http://www.epa.gov/superfund/tools/index.htm.

-------
                                     Chapter 6
 Scoping Studies of Mining and Mineral Processing Impact Areas
6.1    Introduction

The purpose of this chapter is to discuss the scoping process at abandoned mining and mineral
processing sites. The first section of the chapter will present background information on the
scoping process in general. Details on the individual tasks associated with the scoping process
used under CERCLA can be found in Chapter 2 of the Guidance for Conducting Remedial
Investigations and Feasibility Studies Under CERCLA.^ The terms used in this chapter to
identify scoping and activities are those used in the guidance. These procedures will prove
valuable whether CERCLA or some other authority guides cleanup activities.  The remainder of
the chapter will address problems and issues to consider when scoping an abandoned mining
or mineral processing site.
6.2    Scoping

The broad project goals for an investigation at an abandoned mine site are to provide the
information necessary to characterize the site, define site interactions, define risks, and develop
a remedial program to mitigate observed and potential threats to human health and the
environment. The purpose of scoping is to:

       Establish a procedure for determining the nature and extent of contamination associated
       with the site;
       Identify possible response actions that may be required to address contamination at the
       site;
       Determine whether interim or removal actions are needed to reduce risks, prevent
       damage, or mitigate current threats; and
       Divide the broad project goals into manageable tasks that can be performed within a
       reasonable period of time and with a logical sequencing of activities.

Because of these activities, scoping should be conducted for any cleanup project, regardless of
the administrative framework being considered for the action. While a mine site cleanup may
not require that a traditional RI/FS  be developed, the framework provided by that activity may
prove useful in scoping and planning. For example, the RI/FS typically includes preparation of
the following: a project work plan, a sampling and analysis plan (SAP), a health and safety
plan, and a community relations plan.

The Work Plan. The work plan documents the decisions and evaluations made during the
scoping process and presents anticipated future tasks.  Five elements are included in the
typical work plan: (1) an introduction, (2) site background and physical setting, (3) initial
evaluation, (4) work plan rationale  (including the identification of data needs and  data quality
objectives), and (5) tasks to investigate and cleanup the site. The information necessary to
complete the work plan will become available as the tasks associated with scoping  are
completed. Additional information  on the elements of a work plan  can be found in Appendix B
of the Guidance for Conducting Remedial Investigations and Feasibility Studies Under
CERCLA. At many sites, including large mining or mineral processing sites, the work plan may
have to be amended as additional  information (data) is acquired. Separate work plans should
       U.S. Environmental Protecfon Agency (EPA), October, 1988. Guidance for Conducting Remedial Investigations and
Feasibility Studies Under CERCLA. Washington, D.C. Office of Emergency and Remedial Response.

-------
6-2 Chapter 6: Scoping Studies of Mining and Mineral Processing Impact Areas	

be prepared for major elements of the site investigation, analysis of cleanup alternatives, and
design of cleanup actions.

The Sampling and Analysis Plan.  The Sampling and Analysis Plan (SAP) ensures the
consistency of sampling and data collection practices and activities over time, and ensures that
data needs and quality objectives developed in the work plan are met. A SAP should be
developed concurrently with the work plan. The plan should be prepared before any field
activities begin, and should consist of two parts: (1) a quality assurance project plan (QAPP),
which describes the policies and activities necessary for achieving data quality objectives
(DQOs) for the site; and (2) the field sampling plan (FSP), which provides guidance for all field
work by defining in detail the sampling and data-gathering methods to be used in the project.2
The sampling  and analysis process and sampling and analysis issues at abandoned mining and
mineral processing sites are  addressed in greater detail in Chapter 7 of this handbook.

The Health and Safety Plan. Health and Safety Plans (HSP) are frequently included  as a part
of the work plan, but may be submitted separately.  Typical elements of an HSP include: names
of site health and safety officers and key personnel; a health and safety risk analysis for
existing site conditions; employee training assignments; a description of personal protective
equipment used by employees; medical surveillance requirements; a description of the
frequency and types of air monitoring,  personnel monitoring, and environmental sampling
techniques and instrumentation to be used; site control measures; decontamination
procedures; standard operating procedures for the site; a contingency plan that meets the
requirements of 29 CFR 1910.120 (i) (1) and (i) (2); and entry procedures for confined spaces.

Specific HSP issues for mining sites include physical hazards such as open shafts, subsidence,
steep slopes, landslide potential, remoteness of sites, and chemical hazards from
contaminants. Structures  can present a special hazard at mill sites and abandoned processing
facilities (e.g.,  buildings may be unsafe for entry, or contain high concentration residues).
Additional information on the Health and Safety Plan can be found  in Appendix B of the
Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA.3

The Community Relations Plan. Community relations planning is particularly important when
the extent of contamination and appropriate response actions are being determined at mining
and mineral processing sites where the community is impacted. Community relations activities
keep the community informed of site activities and helpSuperfund personnel anticipate and
respond to community concerns.  The Community Relations Plan, which documents these
activities, should include the following sections: an overview of the plan, a capsule site
description, background information about the community, highlights of the community relations
program, information about community relations activities and timing, a contact list of key
community leaders and interested parties, and suggested locations for meetings and
information repositories. Additional information on community relations can be found  in
Chapter 5 of this reference document.
       Guidance for the selectbn of field methods, sampling procedures, and custody samples can be acquired from U.S.
Environmental Protection Agency. Compendium of Superfund Field Operation Methods, 1987.

       U.S. Environmental Protecfon Agency (EPA), October 1988. Guidance for Conducting Remedial Investigations and
Feasibility Studies Under CERCLA. Washington, D.C. Office of Emergency and Remedial Response.

-------
                 Chapter 6: Scoping Studies of Mining and Mineral Processing Impact Areas 6-3
6.3    Difficulties in Scoping Abandoned Mine Sites

There are a variety of characteristics of abandoned mine sites that make the scoping and
completion of characterization  and cleanup activities complex.  The following is a discussion of
some of the issues that can  be encountered in scoping an abandoned mining and mineral
processing site.

Size and Location of the Site. Some, although certainly not all, abandoned mine sites have
impacts over large areas, especially if mining areas or districts  or impacted watersheds are
considered.  In addition, some abandoned mines sites may be  more difficult to characterize and
cleanup because of their remote locations, in some cases without road access and/or located at
high altitudes areas. The size and location of abandoned mine sites can make remediation
planning, site characterization, and actual remediation complex.

Volume of Contaminants.  Typical of some abandoned mining operations is the removal of
large volumes of waste material during the mining process.  Furthermore, beneficiation and
mineral processing operations, which are often co-located with  mining operations, typically
generate very large volumes of process waste.  As an example, one tailings impoundment in
the now closed Anaconda mine/smelter site near Butte, Montana covers more than 1000 acres
and ranges in depth up to 100 feet.  These large volumes make traditional remediation (such as
excavation, stabilization, and landfilling) economically difficult even if technical issues can be
resolved. Furthermore, due to the large volumes, complete removal or remediation of the
problem may not be possible,  or remediation may take place in a phased approach.

Type of Wastes.  There may be numerous different types of waste at abandoned mining and
mineral processing sites. These wastes could include tailings,  slags, overburden, waste  rock,
ore stockpiles, and remaining process chemicals. A variety of sampling strategies maybe
needed to characterize each waste type.

Persistence of the Contaminants. Metals, often a primary contaminant at abandoned mine
sites, do not readily decompose or biodegrade into less toxic byproducts as do volatilesand
some organic compounds. Therefore, mine sites abandoned for decades or even centuries
can still have metal concentrations at levels of concern.  Furthermore, metals that are not of
toxic concern can  generate other problems that can occur for decades, such as acid
generation.

Variety of Media Affected.  Contamination at abandoned mine sites often affects many  media.
Surface water and ground water are frequently contaminated by metals leached from mining
and mineral processing wastes and by acid generated within the mines or waste units. Soils
are often contaminated onsite  by historical waste management practices and offsite by fugitive
dust and smelter emissions. Sediments within surface waters may also contain contaminants.
In addition, the air maybe recontaminated during remediation operations or by fugitive dust
blown from abandoned waste  units.  The wide dissemination of contamination at some mining
and mineral processing sites generally requires the collection of a large variety of data from
several different sources. Information about sources, migration pathways, and human and
environmental receptors is generally critical to characterizing the site and formulating plans for
possible remediation alternatives.

Historical Mining Areas. Abandoned mine sites are often located in areas where the
remnants of mining activity is considered to be historical.  The local population is often deeply
rooted in the mining and mineral processing activities, and environmental investigations
undertaken by site managers must take  this into consideration.  Historical preservation is an
issue at some sites. Historical artifacts,  including old mine buildings, mine openings, and

-------
6-4 Chapter 6: Scoping Studies of Mining and Mineral Processing Impact Areas	
associated towns now abandoned, may be located on the site and their continued presence, as
well as access to structures, is expected to remain despite remediation activities. Finally, the
long history of mining and mineral processing in these areas often poses problems in
determining levels of metals naturally occurring in the local water and soils prior to mining
activity.

On-going Mining and Mineral Processing. Some abandoned mine sites may be affected by
ongoing mining and  mineral processing nearby. Often, mines abandoned as uneconomic
utilizing past technologies have been reopened using new technologies or when prices rise.  In
other cases, neighboring claims and associated processing operations continue to operate.
Where these new operations or historical neighboring operations are being conducted,
sampling, risk assessment, and remediation may have to be modified. Any remedial actions on
the site may be affected by ongoing mining and mineral processing operations.  Ongoing
mining and mineral processing operations can  greatly affect both the data collection process
itself and the quality of the data collected.  Isolating the effects of ongoing operations from
waste generated in the past can be challenging. Additional health and safety protocols may
have to be taken into consideration if mining and mineral processing activities are occurring on
the site.  Efforts must be coordinated with mining and mineral processing operators to ensure
the safety of remediation teams.

Location in Non-Industrial Areas. Many mining and mineral processing sites are located in
areas that otherwise would be considered non-industrial natural resource areas. The Bunker
Hill site in northern Idaho, for example, is in forested mountain country; however, large areas of
the site have been denuded of most vegetation.  Local governments or other entities
associated with old mining and mineral processing areas may want a total cleanup because
they are seeking an inflow of recreational dollars. They may also, however, want no cleanup
because  of their  desire to avoid the stigma of a Superfund site or they may want to retain the
historic features.

Because many abandoned mine sites are located in or near non-impacted environments, the
ecological risk assessment can become more important, particularly if the human population
around the sites  is small or nonexistent.
6.4    Scoping Issues Associated with Mining and Mineral Processing Sites

Abandoned mining and mineral processing sites can present many challenges and issues
during scoping. Characterizing mining and mineral processing sites and identifying problems
and potential solutions can be very complex, particularly at the large sites where both mining
and mineral  processing have occurred. The remainder of the chapter will present important
issues for consideration when scoping a mining and mineral processing site.

6.4.1   Operable Units

The size of abandoned mining and mineral processing sites can create special challenges for
tasks  associated with the scoping process.  Sites are often far too large to address in a single
response action, and the actions selected may require a longer time frame to undertake than is
common for other smaller or more contained sites. For this reason, mining sites are often
divided into smaller units, which are called Operable Units (OUs), that are then characterized
both individually and as part of the whole site.  The term Operable Unit has specific meaning
under CERCLA, which may differ somewhat from  the description in this chapter.  Also, because
human health may be of critical concern in some areas  it may be appropriate to focus on units
that impact human health first, with ecological considerations being investigated as a distinct
unit.

-------
                  Chapter 6: Scoping Studies of Mining and Mineral Processing Impact Areas 6-5
Establishing Operable Units. While there are no definitive criteria for designating units, many
area-specific factors are used: (1) similar contamination of waste material or environmental
media (e.g., soils, flue dust,  or ground water); (2) similar geographic locations; (3) similar
potential deanup techniques; (4) potentially similar cleanup time frames; and (5) sites that are
amenable to being managed and addressed in a single decision making process.  As an
example, the East  Helena Smelter Superfund site, an active smelting operation, has five
operable units: (1) process ponds and fluids; (2) groundwater; (3) surface water, soils,
vegetation, livestock, fish, and wildlife; (4) slag piles; and (5) ore storage areas.

Prioritizing Operable Units. Once units have been designated, they should be ranked to
determine the order in which they will be addressed for remediation. Again, standardized
criteria have not been established for determining unit priorities; however, exposure may be a
significant factor in assigning priority to sites based on the degree of risk they pose to human
health and the environment.  See Chapter 8 for more information on risk. An example of
response priority criteria for  OUs is Shown in  Exhibit 6-1.
                                        Exhibit 6-1
                         Sample Criteria Used to Prioritize Operable Units

 At the Clark Fork Superfund site in Montana, EPA used the following criteria to establish response priorities for
 OUs:

        High Cleanup Priority
              High potential for exposure to humans or to the environment;
              Cleanup required to study or address other OUs.

        Intermediate Cleanup Priority
              Moderate potential for exposure to humans or to the environment;
              Potential that cleanup efforts could recontaminate OUs located downstream, downgradient, or
              downwind
              Unusual complexity of problems that could require lengthy evaluation.

        Low Cleanup Priority
              Currently low potential for exposure to humans  or to the environment;
              Potential for higher levels of exposure in the future;
              Low risk of off-site contamination.
Primary Threats. For each unit, the site manager determines the primary threats and
pathways. Primary threats are initially identified during scoping to assist in setting response
priorities, to identify needed removal actions, and to prepare appropriate sampling and analysis
strategies.  They are later confirmed and evaluated during the baseline risk assessment (see
Chapter 8 of this reference document) to guide decision-making about potential responses.
Examples of primary threats at mining and mineral processing sites are displayed in Exhibit 6-2.

Cleanup Objectives. Based  on the primary threats, potential routes of exposure, and
associated receptors identified in the site characterization and risk assessment, the lead
agency identifies cleanup objectives (called Remedial Action Objectives (RAOs) under
CERCLA) for each unit.  Objectives consist of medium-specific or unit-specific goals for
protecting human health and the environment.  Because protection may be achieved by
reducing exposure to contaminants (by capping an area, limiting access through institutional
controls, or providing an alternate water supply) as well as by reducing  the contaminant
concentration, objectives for protecting receptors (see Exhibit 6-3) should be expressed both as
a contaminant level and an exposure  route, rather than as a contaminant level alone. Further,
objectives should be expressed in terms of the medium of interest and target cleanup levels
(i.e., Preliminary Remediation Goals), whenever possible.

-------
6-6 Chapter 6: Scoping Studies of Mining and Mineral Processing Impact Areas
                                          Exhibit 6-2
                  Primary Threats at Superfund Mining and Mineral Processing Sites
 Major Contaminants
    Naturally Occurring: Lead, Zinc, Copper (and other heavy metals), Arsenic, Cadmium, Mercury, Antimony,
    Selenium, and Uranium
    Introduced During Extraction, Beneficiation, and Processing: Cyanide, acids, bases, PCBs, asbestos,
    and others
 Sources of Contamination
    Mined Areas: Open pits, mine shafts, and tunnels
    Impoundments: Tailings, run-off collection, wastewater treatment, and leaching solution ponds
    Piles: Overburden, tailings, slag, air pollution control dust
    Sediments:  Sediments in river beds, mine pits, and drainage channels
    Processing: Slag, air pollution control residues, wastewater, treatment sludges, and deposition of stack
    emissions
                                           Exhibit 6-3
                                     Receptors and Pathways
         Human Receptors and Pathways

       Inhalation of contaminated/radioactive fugitive
       dust
       Consumption of contaminated drinking water
       wells and aquifers
       Ingestion of contaminated fish, vegetables, soil,
       or wildlife
       External exposure to radionuclides	
  Ecological Receptors and Pathways

Potential fish kills and degradation of aquatic
systems from direct contaminant exposure
Riparian vegetation kills along contaminated
streams/rivers
Wildlife exposure to contaminated soils and waters
If an overall site management plan is prepared, it should reflect the relationships between units
and the danger of recontaminating an area where cleanup has been completed. The
excavation or movement of contaminated materials at one area of the site may affect air,
streams, rivers, or ground water, and may affect locations downwind, downstream, or
downgradient.  In addition, remediating a heavily contaminated  area without remediating the
source could result in later recontamination. These considerations should be important ones in
making sequencing decisions for investigating response actions where multiple unite exist.

6.4.2 Interim Actions
Interim actions may be appropriate for some units to protect human health and the environment
from an immediate threat in the short term while a final remedial solution is being developed, or
to stabilize a site or units with temporary measures to prevent further migration or degradation.
Examples of interim actions taken at mining sites include: providing bottled water or temporary
well filters to residents until private wells are reclaimed or water supplies are provided;
relocating contaminated material from one area of a site (i.e., residential yards) to a more
remote area of the site for temporary controlled storage; and temporarily capping waste piles to
reduce fugitive dust until  a more permanent remedy can be performed.  Interim actions are
discussed further in Chapter 9 of this reference document.

-------
                 Chapter 6: Scoping Studies of Mining and Mineral Processing Impact Areas 6-7
6.4.3 Unusual Requirements

There are many statutes that may be applicable to mining and mineral processing sites but
would not ordinarily be considered appropriate for other sites (e.g., Endangered Species Act,
National Historic Preservation Act, the Archeological and Historic Preservation Act, the Historic
Sites, Buildings, and Antiquities Act, etc.).  These statutes may be identified as Applicable or
Relevant and Appropriate Requirements (ARARs) at CERCLA sites.

In addition, there are certain circumstances under which ARARs may be waived; these are
stipulated in the NCP (40 CFR 300.430(f)(1 )(ii)(C). Given the possibility of unusual site
characteristics at abandoned mining and mineral processing sites (e.g., difficulty with
background levels, large size, location, and multimedia effects), waivers may  be necessary at
these sites.  Chapter 11 of this handbook discusses issues for ARARs at mining and mineral
processing sites in greater detail.  In addition, Appendix D of this handbook provide a general
discussion of some of the most common federal ARARs at Superfund mining  sites.
6.5  Sources of Additional Information

Additional information on scoping studies can be found in EPA-OERR's October 1988
Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA.
Another source of information can be found on the EPA website, including the information at
http://www.epa.gov/superfund/whatissf/sfprocess.htm.

-------
6-8 Chapter 6: Scoping Studies of Mining and Mineral Processing Impact Areas
                           (This page intentionally left blank)

-------
                                       Chapter 7
                   Sampling & Analysis of Impacted Areas
7.1    Introduction

The purpose of this chapter is to introduce concepts and issues related to designing and
implementing a sampling and analysis program for characterizing mining and mineral processing
site waste management areas.  This part of the planning process provides a path to prioritizing
remedial actions and setting realistic goals, because it may not be possible to completely remove or
remediate areas that may occupy many square miles

Section 7.2 will present general information about the sampling and analysis process. The
individual tasks associated with sampling and analysis can be found in Chapters 3 and 4 of the
Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA1. The
terms used in this chapter to identify sampling and analysis activities are those used in the
guidance.  For non-CERCLA actions the site manager is advised to consider CERCLA guidance in
the context of site specific needs and circumstances.

Mining and mineral processing sites present many problems and  issues that are not characteristic of
other sites. Section 7.3 of the chapter will present unique characteristics of mining and mineral
processing sites and briefly discuss how these characteristics can affect the sampling and analysis
program. The remainder of the chapter will address issues associated with sampling and analysis
at abandoned mining and mineral processing sites.
7.2    Sampling and Analysis

During the scoping process, any data for the site that is available will be collected, reviewed and
analyzed, and the need for additional data defined.  A sampling and analysis effort will likely be
required to provide this additional data. A sampling and analysis plan (SAP) is a necessary part of
the investigation and remediation process. This plan can  be revised as sampling and analysis
efforts are implemented.

The SAP is a document that specifies the process for obtaining environmental data of sufficient
quality to satisfy the project objectives.  Defining data quality objectives (DQOs) is the most
important preliminary activity in creating an SAP.  The DQO process offers site managers a way to
plan field investigations so that the quality of data collected can be evaluated with respect to the
data's intended use.

The outputs of the DQO process feed directly into the development of the two parts of the SAP: the
quality assurance project plan  (QAPP) and the field sampling plan (FSP).  The FSP describes the
number, type, and location of samples and the type(s) of field and analytical analyses; whereas the
QAPP describes the policy, organizational, and functional activities necessary to collect data that
will stand up to legal and scientific scrutiny.  The SAP integrates the DQOs, FSP, and QAPP into a
plan for collecting defensible data that are of known quality adequate for the data's intended use.
More information on the tasks  associated with generating the SAP can be found in Chapter 2 of the
Guidance for Conducting Remedial Investigatbns and Feasibility Studies Under CERCLA.
Problems and issues that arise while creating and implementing the SAP will be discussed in  the
remainder of this chapter.
         U.S. Environmental Protecfon Agency (EPA), October, 1988. Guidance for Conducting Remedial Investigations and
 Feasibility Studies Under CERCLA. Washington, D.C. Office of Emergency and Remedial Response.

-------
 7-2 Chapter 7: Sampling & Analysis of Impacted Areas
7.3    Issues for Sampling at Mining and Mineral Processing Sites

There are several important issues to consider in developing a sampling and analysis plan for an
abandoned mining and mineral processing site. Mining sites may pose different sampling and
analysis challenges than other hazardous waste sites contaminated by organic compounds and
metals. The potential for widespread variable contamination is tremendous and the size of the site
and volume of the contaminants can greatly complicate sampling and analysis efforts.

7.3.1   Defining Analytical Data Needs

This section briefly discusses analytical data needs and sources of analytical services for managing
a sample analysis effort under the Superfund Program. Site managers of non-CERCLA
investigations should select elements appropriate to their specific site.  The key component in
defining the analytical program needs for a mining and mineral processing site is to talk with fate
and transport experts and environmental risk assessment experts  to determine the forms of metals
and other site contaminates (e.g., cyanide) that should be investigated. A clear understanding of
the mining and mineral processing operations that have occurred on the site will greatly contribute
to planning the investigation.

The particular type of data that needs to be generated depends on the project needs.  The project
needs  are expressed as qualitative and quantitative DQOs which are developed in the project
planning process.

       Screening data. Screening data at mining and mineral processing sites can help to reduce
       initial sampling costs; analyses are conducted by  rapid, less precise methods, with less
       rigorous sample preparation. Screening data provide analyte identification in the absence of
       historical site information.  The x-ray fluorescence (XRF) analytical method is often used for
       screening data to increase the representativeness of the sampling quickly.  See Section
       7.3.7 of this chapter for more information on analytical methods and Appendix E for more
       information on the XRF method.

       Definitive data. Definitive data  are generated  using rigorous analytical methods, such as
       approved EPA reference methods. Data are analyte-specific, with confirmation of analyte
       identity and concentration.

7.3.2   Understanding Pre-mining Conditions

At certain sites, the sampling plan can provide a useful tool to determine whether a release or
threatened release represents conditions altered by human activity. This information could be used
to determine whether a response  action would trigger the exception contained in CERCLA section
104(a)(3)(A). That section restricts in certain respects the authority of  the federal government to
take a  CERCLA response action in response to a release or threat of release "of a naturally
occurring substance in its unaltered form, or altered solely through naturally occurring processes or
phenomena, from a  location where it is naturally found."  This narrow exception applies where a
release or threatened release is unaltered by human activity. Quite often,  the impacts of mining are
obvious, so a fairly simple sampling plan or site review can  demonstrate that the releases are
altered and therefore not covered by the exception contained in CERCLA  section 104(a)(3)(A). If the
exception does not apply, the degree of cleanup is governed by CERCLA section 121 and the NCP.
Neither sections 104,  121, or the NCP  require the agency to determine the pre-mining metal levels
as a limit on the CERCLA response action.  A review of natural background  levels might in some
case be considered  in the analysis of ARARs or technical impracticability.  In some instances, an
investigation of the natural background condition can also assist the agency to determine the
feasibility of achieving cleanup goals.

-------
                                            Chapter 7: Sam pling & Analysis of Impacted Areas 7-3
At mine sites, determining the pre-mining baseline condition can be a difficult or impossible task
because mining activities often disturb mineralization in profound ways. Mining activities, such as
removing overburden, tunnelling into the ground and removing ore, often expose previously
protected mineralization to accelerated oxidation.  These activities can also change ground water
and surface water flow regimes, which can facilitate the release of metals into the environment.

Other factors also complicate efforts to determine pre-mining  conditions at disturbed mineralized
deposits. In many cases, mineralized  areas are highly heterogeneous. Highly variable conditions
reduces the ability to determine whether any particular area is undisturbed and representative of
pre-mining, site-wide conditions.  Moreover, ground water sampling efforts can disturb and expose
the mineralization. This disturbance can elevate metal concentrations in the sample well above the
levels present in an undisturbed condition, causing misleading results regarding the undisturbed
condition. Moreover, efforts to associate releases to particular areas through metal ratios is
complicated by seasonal variability and chemical and physical processes that  occur as the water
moves from the mineralized area to the sampling point. The unique nature of  each mineral deposit
also limits the ability to rely on undisturbed mineralized areas  in other geographic locations as
representative of the pre-mining conditions at the subject site.

Mineral processing activities can also complicate the study  of pre-mining conditions. Mineral
processing operations can deposit mine processing dust and waste over areas several square miles
in size.

While statistical methods that rely on site chemistry may not be appropriate at most mine sites, in
some cases non-chemical data can be used to infer pre-mining conditions. For example, evidence
may indicate that prior to mining a stream supported aquatic life while after mining the stream does
not support an aquatic community. This information would indicate that the pre-mining releases
were relatively small relative to the post mining condition. Anecdotal evidence from the pre-mining
period can also provide information regarding  metal concentrations.

If chemical analysis will be used to differentiate unaltered naturally occurring releases from  altered
releases, it will be important to select appropriate "reference area" locations.  A background
sampling location should usually be upwind and upstream of the site. In other cases, a nearby
watershed, unimpacted by mining, may provide an appropriate site for background water samples.
In either case, the site should have soil characteristics and  related properties similar to those that
would have existed at an undisturbed portion of the site.  If  several different types of soil or habitats
are present at the site, the site manager may need to gather more than one set of background data.
The heterogeneous nature of mine sites, coupled with widespread contamination problems
associated with mining, can greatly complicate reliance on a nearby reference site.

In selecting a reference area, the risk assessor should also consider anthropogenic contributors
other than mining. For example, if a busy highway runs through a proposed background sampling
area, the same or a similar highway should be associated with the mine waste site to account for
leaded gasoline deposition.  Locations that reflect obvious contributions of human activity, such as
roadsides, drainage ditches, storm sewers, should generally be judged as inappropriate for
collected background samples.

If background sampling is deemed necessary, it will be important to understand early in the process
the ways in which the data will be used. For example, to ensure that spatially relevant and
statistically significant results can be obtained, the assessor should design a plan to ensure that  the
assessor collects an adequate number of samples over an  appropriate area and in a relevant
pattern.

-------
 7-4 Chapter 7: Sampling & Analysis of Impacted Areas
7.3.3  The Importance of Site Characterization

Prior to developing an actual sample collection strategy, proper characterization of the mining and
mineral processing site should be conducted including:

       Reconstructing pre-mining conditions;

       Inventorying what has been deposited above-ground;

       Obtaining records to determine the geology of areas where underground mining occurred;

       Monitoring the movement of both surface and ground water; and

       Estimating the impact of mining and mineral processing disturbances.

A thorough site characterization should include an understanding of the different mining and mineral
processing processes that occurred since mining and mineral processing operations began. This
type of information can  be very helpful in anticipating all of the different types of waste that may be
encountered at the site and determining where sampling should occur to obtain accurate data (see
Chapter 2 for a discussion of mining and mineral processing processes).  For example, milling
operations generate very different wastes from smelting operations; and knowing which processes
occurred at what time will help direct where samples should be taken and how  they should be
analyzed. A complete site characterization may also minimize sampling needs, thereby saving time
and money.

There is a great deal of information available regarding historical mining and mineral processing
sites that is helpful in site characterization.  Mining  companies may have significant background
information from pre-mining exploration as well as information on how the site appeared before
mining activities (This information may be important in developing long-term structurally stable
cleanup plans). The information collected by the U.S. Geological Survey (USGS) and U.S. Bureau
of Mines, now in the Office of Surface Mining (OSM), may be good sources of  pre-mining site
characterization data. State geologic or mining divisions also can have extensive historic mining
databases. Historical production records from the mining and mineral processing operations may
be kept by local historical societies. These records could provide tonnages, grades, and
concentration methods.  State mine inspector reports may also be used as a source of tonnage,
grade and information on significant changes in the mining and mineral processing  operations.
Newspaper articles, books written about the mine or mining district, annual reports of mining and
mineral processing companies, and work by government agencies may also provide information that
will help determine where to sample, what contaminants to expect, and the range of concentration
to anticipate.

Once the history of the  mining and mineral processing site is characterized, the sampling  strategies
selected should be appropriate,  based on pre-specified DQOs.  Time consuming or expensive
sampling strategies for some media may prohibit multiple sampling points; consequently it is
important to balance the sampling objectives against the time and costs involved.

7.3.4  Calculating Preliminary Cleanup Goals

Preliminary Cleanup Goals (called Preliminary  Remediation Goals (PRGs) under CERCLA) at
mining and mineral processing  sites can be used to focus cleanup efforts on a  risk basis,
concentrating sampling efforts in areas posing  the highest risk hazards. Site specific cleanup goals
can be calculated based on the environmental pathway at the site and the potential receptors.
Setting preliminary cleanup goals is useful in focusing early action and site characterization goals
while a site specific risk analysis is undertaken and should be included in large site deanup projects.

-------
                                           Chapter 7: Sam pling & Analysis of Impacted Areas 7-5
Risk analysis efforts can be scaled back for smaller or more remote sites. PRGs may be useful in
establishing detection limits required for analytical samples.

7.3.5  Selecting a Qualified Analytical Laboratory

Mining and mineral processing waste samples can pose unique analytical requirements.  Samples
often have a low pH level; contain several metals, often at high concentrations and varying
solubilities; and vary widely in particle size.  In selecting a qualified analytical laboratory, it is critical
to consider the complexity of the sample matrix which will be analyzed. Site managers should
select a laboratory that can handle the specific needs of their site and  meet the established DQOs.
Portable analytical laboratories ,  if used should be selected with the same criteria.

If an EPA  Contract Laboratory Program (CLP) laboratory is selected, it is important to realize that
the lab may not be  experienced in analyzing mining and mineral processing waste. The routine
sample preparation procedures and the pre-specified detection limits that the CLP process uses
may not be applicable for mining and mineral processing waste samples. The site specific
conditions will determine if a CLP laboratory is appropriate.  These will include the  need for
specialized services,  such as the acid-base account or humidity cells.  In addition,  if the
concentration of contaminants in these samples is expected be orders of magnitude above the
detection limit, the sample  may not be accurately analyzed with the CLP procedures unless the lab
is advised upfront.  These factors are important when the site manager is considering what
laboratory should perform the sample analyses for their specific site.

7.3.6  Determining the Leachability of Contaminants

The first critical step in selecting  analytical methods appropriate to mining and mineral processing
sites is the recognition that metal speciation is an important factor affecting the mobility and toxicity
of metals at mining and mineral processing sites. Metals form different chemical compounds on the
basis of their pH and oxidation-reduction potential, as well as the nature of the aqueous chemical
environment. Different metal spedes form compounds with different solubilities, activities, toxicities,
and environmental fates. Identifying these species at mining and mineral processing sites is
extremely important in understanding a site, making assessments concerning environmental and
human health risks, and arriving  at reasonable decisions  concerning cleanup actions.  Interpretation
of fate and transport potentials based on static and kinetic tests depends on the nature of the test
(e.g., solvent duration) and the nature of the samples (e.g., tailings [fine particles, more surface
area] versus some  slag [coarse material, less surface area]).

The fate and transport of various chemical constituents from mining and mineral processing wastes
can be evaluated by conducting  static and kinetic tests. Tests can be  used to determine  if a waste
is hazardous; the sample results depend upon the material(s) being tested.  The most common test
used internationally for mining and mineral processing waste samples is the Acid-Base Account.
Since the  1970's variations of the Acid-Base Account have been used. These methods are based
on measuring the total sulfur content in the sample to determine the amount  of acidity that could be
produced  if all the sulfur were oxidized to sulfate and comparing the amount  of acidity to the total
buffering capacity of the rock. The test results can  be used to determine the potential for metal
leaching by computer analysis.

Other test methods are commonly used for conducting mining and mineral processing waste
leachability analyses. These tests, however, may or may not be appropriate since they are
conducted under saturated conditions (i.e., they do not measure the oxidation potential of sulfur
bearing minerals).  The primary RCRAtest used  to characterize waste samples is the Toxicity
Characteristic Leaching Procedure (TCLP). Three potential alternatives to the TCLP exist: the
Synthetic Precipitation Leaching  Procedure (SPLP),  which some states reportedly use; the Multiple
Extraction Procedure (MEP); and California's  Waste Extraction Test (WET).  Some states use  other

-------
 7-6 Chapter 7: Sampling & Analysis of Impacted Areas
methods; for example, Nevada uses the Meteoric Waste Mobility Test (MWMT) to assess the
likelihood of acid generation overtime.  Additional information on the test methods discussed above
can be found at the following:

       •       TCLP - http://www.epa.gov/epaoswer/hazwaste/test/131 Ipdf:
              SPLC - http://www.epa.gov.80/epaoswer/hazwaste/test/1313.pdf:
       •       MEP - http://www.epa.gov.80/epaoswer/hazwaste/test/1320.pdf:
              WET - can be found in the California Code of Regulations, Title 22, Chapter 11,
              Article 5).

7.3.7  Selecting Analytical Methods

Many methods are available for the analysis of mining and mineral processing waste samples. The
Guide to Environmental Analytical Method^ provides information on analytical methods, such as
method detection limits, sample preservation requirements, field sample volumes required, and
holding times. Examples of general analytical methods include total constituent analysis, acid
digestion, X-ray fluorescence (XRF), and gas chromatography-mass spectroscopy (GCMS). Most
of the methods mentioned in the Guide are included in SW- 8463 EPA's test methods for evaluating
solid waste. EPA's waste characterization data on Superfund mining and mineral processing sites4
provides examples of sampling and analysis methods already used at selected mining and mineral
processing sites.  Exhibit 7-1 shows examples of analysis methods that have  been chosen in the
past.
                                        Exhibit 7-1
                               Sampling and Analysis Methods
 Method                        Mining and Mineral Processing Site/Sample Matrix

 Wet Chemistry/XRF               Cherokee County, KS. Galena Subsite: waste samples analyzed for
                               metals

 Acid Digestion                   Cotter Uranium Mill, Canon City, CO: soil and sediment samples

 XRF/ (Inductively Coupled Plasma    Tex Tin Corporation, Texas City, TX: samples analyzed for lead, iron,
 Emission                       nickel and tin initially using XRF did not show presence of metals;
 Spectroscopy (ICP))              samples were then extracted with nitric acid and analyzed with ICP to
                               confirm XRF results.
X-ray Fluorescence (XRF) Analytical Method

X-ray Fluorescence (XRF) is a non-destructive analytical technique used to determine the elemental
composition of a sample. XRF measures the X-ray fluorescence coming from the inner electron
shells of the atom. This is a systematic method and each element has its own "fingerprint".  The
XRF method measures the radiation coming direct from atoms and not from chemical compounds.
The X-ray spectrum generated in the sample will tell which elements are present (wavelength of
X-rays) and the amount of these elements (intensity of X-ray wavelength).

XRF is being applied to sites to increase the representativeness of sampling, expedite the activity
by performing real-time data analysis to support decision making, and decrease both the time and
         Wagner, R.E., W. Kotas, and G.A. Yogis, 1992. Guide to Environmental Analytical Methods

        3U.S. Environmental Protecfon Agency(EPA), 1986. Test Methods for Evaluating SolidWaste (SW-846): Physical
 Chemical Methods.

        4
         U.S. Environmental Protecfon Agency, 1991. Mining Siteson the Natbnal Priorities List: Waste Characterization Data.

-------
                                           Chapter 7: Sam pling & Analysis of Impacted Areas 7-7
cost of these activities. Because of this, XRF is being considered at many abandoned mining sites.
As with any method, application of the XRF method depends on the project objectives and
associated DQOs. Representativeness and completeness are two  of the major advantages of
using XRF. On-site, real time chemical analysis can document representativeness and allows
critical samples to be collected and analyzed, which typically ensures completeness.

Media that are commonly appropriate for XRF analysis include soils, in particular, but essentially all
solids, as well as  liquefied solids, such as sludges and slurries.  Detection limits extend from mg/kg
(parts per million) to the 100 percent range for mobile XRF instruments and from tens to hundreds
of mg/kg to 100 percent for field portable instruments.

Field-portable instruments, usually weighing less than 20 pounds (induding batteries), can be
carried to the sample location.  Mobile instruments, however, require line voltage, and are usually
placed within a specific building or van near or at the site to generate quality data. Decisions
concerning the attainment of an action level can be made quickly at the site.  Coupling the use of a
field portable and mobile laboratory instruments at a site would allow for almost immediate
decisions to be made concerning an action level in the field that can be confirmed by the mobile
laboratory. Typically, a representative composite sample from the site area under cleanup action is
sent to the laboratory for final documentation of the clean up level.

In most instances, an  initial  set of site samples is required for calibration purposes.  The samples
should cover the matrices and concentration range of elements of concern as determined by a total
metals analysis by a laboratory. The samples should  be prepared by the laboratory using the same
protocol that will be  used with the XRF at the site.

At the sample location, a field-portable instrument is equipped with a probe that allows considerable
flexibility in how a sample is presented to the source.  The source may be pressed against the
media of interest (soils, tailings, walls, etc.) or a sample cup of material (soil,  slurry, sludge, etc.)
can be placed on top of the source.  Samples may be sieved or pulverized but sample preparation
is typically minimal.  Field-portable instruments are versatile but have the highest detection limits of
the three types of instruments. Typical detection limits with  little to  no sample preparation are in the
100 mg/kg range, depending on sample matrix. For mobile instruments, sample preparation is part
of the analytical schedule and includes sieving and pulverizing.  A typical detection limit will range
from 5 to 30 mg/kg,  depending on the sample matrix.  Sample preparation and particle size
variance are major potential sources of error.

High expectations and indiscriminate use of the instruments outside the design limits of the unit has
sometimes led to discouragement in the application of field-portable XRF instruments. Although a
particularly low detection limit may not be achievable in some cases, the instrumentation will usually
determine hot spot areas, document that representative sampling has been accomplished, and
determine that an action-level for a particular element has been reached in real time at the location.
Confirmatory analyses should be performed by a fixed analytical laboratory.

The total extent of XRF application to abandoned mining sites is undoubtedly larger than the
published accounts  of such  applications. Documented use of field-portable XRF instruments start in
1985 with the Smuggler Mountain Site near Aspen, Colorado.5 The instrument was used to
determine action-level boundaries of 1,000 mg/kg lead and  10 mg/kg cadmium in soils and mine
waste. The same site was used for the evaluation of a prototype field-portable XRF instrument
          Mernitz, S., Olsen, R., and Staible, T., 1985, Use of Portable X-Ray Analyzer and Geostatistical Methods to Detect and
 Evaluate Hazardous Materials in Mine/Mill Tailings: Proc. Natl. Conf. on Management of Uncontrolled Hazardous Waste Sites,
 Washington, DC, pp. 107-111.

-------
 7-8 Chapter 7: Sampling & Analysis of Impacted Areas
specifically for hazardous waste screening6. Field-portable instruments have also been used at the
California Gulch Site, Leadville, Colorado; Silver Bow Creek and other sites near Butte, Montana;
Bunker Hill Site, near Kellogg,  Idaho; and the Cherokee County Site, Tri-State Mining District,
Kansas for screening purposes during site characterization. A field-portable instrument has been
used to screen a large area (21 square miles) to select large,  homogeneous volumes of heavily
contaminated soils for treatability studies and for Site Comparison Samples at the Bunker Hill Site.7
Portability and "real-time" basis data were necessary prerequisites.  A mobile XRF instrument was
used for multi-element analysis of lead, arsenic, chromium, and copper in soils.8  Detection limits
with the x-ray-tube-source and Si(Li) detector were as low as  10 mg/kg. The data were used to
map the extent of contamination within a  superfund site. Detection limits for field-portable
instruments are not low enough to determine cadmium concentrations as low as  10 mg/kg in some
areas/matrices, but zinc was found to be  a good surrogate indicator element for cadmium in
Cherokee County, Kansas.
          Raab, G.A., Cardenas, D., Simon, S.J., and Eccles, L.A., 1987, Evaluation of a Prototype Field-Portable X-Ray
  Fluorescence System for Hazardous Waste Screening: EMSL, EPA 600/4-87/021, U.S. Environmental Protection Agency,
  Washington, DC, 33 p.



         7 Barich, III, J.J., Jones, R.R., Raab, G.A.,and Pasmore, J.R., 1988, The Application of X-Ray Fluorescence Technology
  in the Creation of Site Comparison Samples and in the Design of Hazardous Waste Treatment Studes: First Intl. Symposium, Field
  Screening Methods for Hazardous Waste Site Investigations, EMSL, Las Vegas, NV, pp.  75-80.
          Perlis, R., and Chapin, M., 1988, Low Level XRF Screening Analysis of Hazardous Waste Sites: First Intl. Symposium,
  Field Screening Methods for Hazardous Waste Site Investigatbns, EMSL, Las Vegas, NV, p. 81-94.

-------
                                      Chapter 8
    Scoping and Conducting Ecological and Human Health Risk
              Assessments At Superfund Mine Waste Sites
8.1   Introduction.

The purpose of this chapter is to highlight some of the unique issues related to risk
assessments at abandoned mine waste sites and to provide some guidance to help address
these issues.  Baseline risk assessments for site investigations provide a basis for risk
management decisions.  Although risk management decisions help determine the scope of the
risk assessment, they should not  influence the analytical process utilized in the evaluation.  For
example, scientific elements of the dose-response evaluation will remain consistent throughout
all risk assessment activities.  Risk assessments are also conducted to support removal actions
that reduce excess risks to health to acceptable levels. This chapterfurnishes Site managers
and other federal, state,  and local authorities with a summary of key issues relevant to mine
waste site risk assessments as well as a compilation of references to other helpful resources.
In some cases, cleanup activities can be implemented without conducting a baseline  risk
assessment.
8.2   Supporting Guidance Documents.

EPA Risk Assessment Guidance for Superfund (RAGS), including Volume 1 parts A, B2 and C3
D4, and a supplemental volume5, provide a broad, conceptual framework for conducting human
health risk assessments at CERCLA sites. These concepts, while originally developed to
address risk assessment issues during CERCLA action, are appropriate to consider in
evaluating risk at non-CERCLA sites.  Guidance for conducting ecological risk assessments
may be found in the Ecological Risk Assessment Guidance for Superfund6 (ERAGS), the EPA
Guidelines for Ecological Risk Assessment7, the field and laboratory reference guide8, and in
Appendix F of this document.  EPA's Office of Emergency and Remedial Response supplies
copies of the ECO Update intermittent bulletin series of supplemental ecological risk
assessment guidance on specific technical and procedural issues.  General EPA guidance
  1 U.S. Environmental Protection Agency (EPA). 1989. Risk Assessment Guidance for Superfund: Volume 1 - Human Health
Evaluation Manual, Part A: BaseSne Risk Assessment. EPA/540/1-89/002.

  2 U.S. Environmental Protection Agency (EPA). 1991. Risk Assessment Guidance for Superfund: Volume 1 - Human Health
Evaluation Manual, Part B: Development of Risk-based Preliminary Remediation Goals. EPA/540/R-92/003.

  3 U.S. Environmental Protection Agency (EPA). 1991. Risk Assessment Guidance for Superfund: Volume 1 - Human Health
Evaluation Manual, Part C: Risk Evaluation of Remedial Alternatives. EPA/540/R-92/004.

  4 U.S. Environmental Protection Agency (EPA). 1998. Risk Assessment Guidance for Superfund: Volume! Human Health
Evaluation Manual, PartD, Standardized Planning, Reporting, and Review of Superfund Risk Assessments. Office of Emergency
and Remedial Response, Publication 9285.7-01D

  5 U.S. Environmental Protection Agency (EPA). 1991. Risk Assessment Guidance for Superfund: Volume 1 - Human Health
Evaluation Manual, Supplemental Guidance:  Standard Default Exposure Factors. OSWER directive 9285.6-03.

  'U.S. Environmental Protecfon Agency(EPA). 1997. Process for designing and conducting ecological risk assessments.
EPA/540-R-97-006, June 5, 1997.

  'U.S. Environmental Protecfon Agency (EPA). 1998.  Guidelines for Ecological Risk Assessment. EPA/630/R-95/003F.

  8 U.S. Environmental Protecfon Agency (EPA). 1989. Ecological Assessment of Hazardous Waste Sites: A Field and
Laboratory Reference. EPA/600/3-89/013.

-------
8-2 Chapter 8: Scoping and Conducting Risk Assessment
documents that address risk-related issues include Superfund Accelerated Cleanup Model
(SACM) information9, guidance addressing data useability in risk assessments10, data quality
objectives11, and risk characterization12.

Other guidance specific to particular issues or regions may be obtained through regional
offices.  Contact the regional EPA office associated with a given site to determine if regional
guidance is available, as well as to determine the appropriateness and applicability of utilizing
guidance documents from other regions on particular issues.  For example, OSHA and related
work place regulations  (e.g., ACGIH, NIOSH) do not apply to environmental contamination,
exposure to non-workers, or to workers outside of their controlled job setting. EPA and OSHA
have an MOU on this subject and some regions have guidance for handling joint occupational
and environmental exposures and resulting risks.  Reference and guidance documents are also
available from other federal agencies (e.g., (JSGS)and from various state agencies (e.g.,
California Environmental Protection Agency).

Contact information and electronic versions of some EPA publications are available online
through the world wide web at http://www.epa.gov and new  publications are available from the
U.S. EPA Office of Research and Development at http://www.epa.gov/ORD/whatsnew.htm.
8.3   Overview of Mine Waste Site Risk Assessment Features

Several features of mine waste sites may be unique among hazardous waste sites and should
receive consideration in the baseline risk assessment. This section addresses issues which are
relevant to both ecological and human health risk assessment.

8.3.1 Site Characteristics

Physical Features.  Features prevalent at many mine waste sites that may influence the
approaches taken in the risk assessment include the size of the site, current and future land
uses, the number of contaminants present, media contaminated, and the vertical and horizontal
extent of contamination. Mine waste sites may occupy areas comparatively larger than those of
other hazardous waste sites.  Two examples of influences on the risk assessment are: (1) A
large area is more likely to include greater portions of a particular terrestrial organism's home
range and to possibly include more than one type of ecosystem and  (2) Some former mine sites
are current residential areas while others are very remote and have little likelihood of becoming
residential.

Contaminant Distribution.  Contamination is commonly ubiquitous  across mine waste sites
and includes a large volume of contaminants. Such widespread contamination often requires
multiple pathway exposure evaluations in the risk assessment. It maybe helpful to identify and
focus on contaminants and/or exposure  pathways that will drive the risk assessment; however,
  ' U.S. Environmental Protecfon Agency (EPA).  1994. Risk Assessment Tools forthe Superfund Accelerated Cleanup Model.
Office of Solid Waste and Emergency Response. November. PB94963226.

  10 U.S. Environmental Protection Agency (EPA). 1992. Guidance for Data Useability in Risk Assessment, Parts A and B. Office
of Solid Waste and Emergency Response. Directive 9285.7-09A&B. (PB92963356and PB92963362.)

  11 U.S. Environmental Protection Agency (EPA). 1993. Data Quality Objectives Process forSuperfund Interim Final Guidance.
EPA/540/R-93/071.

  12 U.S. Environmental Protection Agency (EPA). 1995. Memoranda from Carol Brownerregarding EPA Risk Characterization
Program/EPA Risk Characterization Policy and Guidance. Office of the Administrator. March 21.

-------
                                   Chapter 8: Scoping and Conducting Risk Assessments 8-3
each contaminant of concern must be addressed and associated risks must be characterized to
ensure that planned cleanup activities will be comprehensive.  In some cases, this process may
involve a screening-level risk assessment which precedes a more in-depth risk assessment.

8.3.2 Comprehensive Risk Assessment Considerations

Several issues are comprehensive because they are important in both ecological and human
health risk assessments.  This section discusses three such important issues: 1) Background
Contaminant Concentrations, 2) Exposure  Pathways, and 3) Bioavailability.

Defining Background. Naturally high background concentrations of metals are an important
consideration at mine sites. Chapter 7 discusses background  sampling in the initial sampling
and analysis plan; the  EPA Data Useability Guidance, cited earlier in this chapter, may also be
consulted for assistance with planning a background sampling design. To ensure that
appropriate "reference area" locations are  chosen for background sampling, risk assessors
must consider both natural and anthropogenic contributors.  A background sampling location
should usually be upwind  and upstream of the site,  and must have soil characteristics and
related properties similar to those at the site.  If several different types of soil or habitats are
present at the site, more than one set of background  data may need to be gathered to ensure
that appropriate comparisons are made. A nearby watershed, unimpacted by mining, may
provide an opportunity to collect background samples.

Natural  background concentrations of metals in mining areas may occasionally be elevated
above risk-based values or regulatory criteria and standards.  Risk-based values are those
concentrations at or above which an unacceptable human health or ecological effect may occur.
Regulatory levels, including applicable or relevant and appropriate requirements (ARARs,
discussed in Chapter 7) may or may not be risk-based values. If naturally occurring
background concentrations exceed risk-based or regulatory values, the risk assessment may
separately present risks caused by site contributions from natural background levels. The risk
assessment should always present cumulative risk  estimates.  This enables risk managers to
gain perspective and make better cleanup decisions.

Anthropogenic contributors to a background  sampling site should be similar to those connected
with the mine waste site.  Both site samples and background samples should be representative
of the areas under consideration. For example, if a busy highway runs through a proposed
background sampling  area, the same or a  similar highway should be associated with the mine
waste site to account for leaded gasoline deposition.  Locations which reflect obvious
contributions of human activities, such as roadsides, drainage ditches, storm sewers or the like,
could be judged as inappropriate for collecting background samples. These areas may reflect
secondary sources of  contamination and not be representative of the greater area under
consideration.  In rare  cases, a roadway contaminated during the transport of mining materials
may be an area of concern. It is important that the intended applications of the background
data in the risk assessment are determined early in the process to ensure that an adequate
number of samples over an appropriate area and in a relevant pattern are collected to allow, as
applicable, for spatially relevant and statistically significant results.   Usually, per ERAGS
Appendix D (Statistical Considerations), a  1-tail t-test is adequate to compare background with
site concentrations, provided that independent representative samples from proper locations
are evaluated. EPA guidance on the determination of inorganic content in soils and
sediments13 is also available.
  11 U.S. Environmental Protection Agency (EPA). 1995. Engineering Forum Issue:  Determination of Background Concentrations
of Inorganics in Soils and Sediments at Hazardous Waste Sites. Office of Solid Waste and Emergency Response. December.
EPA/540/5-96/500.

-------
8-4 Chapter 8: Scoping and Conducting Risk Assessment
Exposure Pathways and Sources.  Risk assessments at mine waste sites commonly require
evaluation of exposures from multiple sources and exposure via multiple pathways.  Multiple
pathway assessments for terrestrial ecological receptors may include surface water ingestion,
incidental ingestion of soil, or ingestion of contaminants taken up by plants.  For human health
assessments, multiple exposure pathways may include dermal contact with soil or water,
incidental ingestion of soil or dust, inhalation of dust, and ingestion of ground or surface water.
Multiple contaminant sources, such as nearby off-site tailings piles and  roadways constructed of
slag or waste rock, may also contribute to risks incurred by mobile populations with large home
ranges as well as human beings that live and  play in various areas of the site. Concurrent
occupational and residential exposures are particularly relevant for those contaminants that are
encountered both on the job and at home. Exposure sources may also include exposures from
lead-based household paints and occupational metal exposures.  Such  analyses may later
support multi-media risk reduction options strategies. EPA recommends the development and
use of a conceptual site model (as described in RAGS, Section 3.6) to link releases from
contaminant sources to environmental media  which will be contacted by potential receptors
under current and future land-use scenarios.

Bioavaliability. When estimating the internal dose of a given contaminant, several factors  are
evaluated:  source exposure concentration, intake rate, and the fraction of contaminant which is
biologically available to that  organism.  Considerations of the particle size and mineralogy, the
oxidative state of the metal,  physical  accessibility  (e.g., whether or not it is encased by another
compound which is not able to be broken down by an organism's digestive system) can modify
an organism's internal dose. Data for assessing bioavailability may  come from  animal testing or
from validated laboratory (in vitro) procedures. Only tests with biological systems can provide
bioavailability values. Other non-animal experimental procedures  may provide  information
regarding "bioaccessibility,"  or the potential for uptake based on physical or chemical features.
TCLP, EP-TOX, chemical  equilibrium computer models and other  non-animal tests provide little
useful information about bioavailability in living systems.  In 1997,  industry-initiated research
was begun to evaluate the use of in vitro methods; however, scientific peer review and
validation have not been completed at this writing. For lead exposure estimates, EPA's
Technical Review Workgroup for Lead (TRW) can provide the latest estimates of bioavailabilty.

With respect to human exposure, bioavailability can be defined as "absolute" or "relative". It is
important for the bioavailability units of measure to properly correspond to the toxicity  units of
measure.  Consult your regional risk assessor for a complete explanation of these terms and
how they affect the risk assessment.
8.4  Ecological Risk Assessment

Understanding the ecological risk posed by a mine site is critical to making sound cleanup
decisions. For a CERCLA cleanup Section 300.430(e)(2)(l)(G) of the NCP states that during
Remedial Investigations and Feasibility Studies, "environmental evaluations shall be performed
to assess threats to the environment, especially sensitive habitats and critical habitats of
species protected under the Endangered Species Act."  In addition, as described in Chapter 7,
numerous federal and state statutes and regulations concerning environmental protection
contain potential ARARs for Superfund sites.

Mine sites are unique from other sites in ways that can influence the size, scope, and detail to
adequately characterize ecological risks. These sites can cover large areas and often affect
large portions of eco-regions.  In historic mining districts mine site impacts can contribute to
degraded environmental conditions throughout a watershed. Moreover, they may be located in
more remote areas, on federally owned  land that is otherwise relatively pristine.  Guidance on

-------
                                   Chapter 8: Scoping and Conducting Risk Assessments 8-5
the role of natural resource trustees is particularly applicable for mine waste sites14.  Mine waste
sites are contaminated primarily with heavy metals and may also be impacted by operational
contaminants including cyanide, acids, and PCBs. These sites may to be located in areas with
soil and waters containing  high background levels of metals and low pH that can complicate
interpretation of soil, sediment, and surface water sampling results. Furthermore, cleanup
options tend to be limited by the magnitude of problems and physical alterations to the land-
scape.

The following sections discuss ecological risk assessment issues associated with mine waste
site investigations. For a more complete discussion  of the ecological risk assessment process,
and some suggestions regarding methods for approaching specific situations, consult the
ERAGS, as well as Appendix F of this handbook.  Helpful examples of ecological risk
assessments prepared for  large mine sites include:  Bunker Hill in  Idaho,  Kennecott  (terrestrial)
in Utah, Sulphur Bank Mercury in California, Carson  River Mercury in Nevada, and California
Gulch (aquatic) in Colorado.

8.4.1 Identification of Potential Chemical and Physical Stressors

The major threat to the environment from mine sites is heavy metal contamination, including
"acid mine drainage".  See also Chapters 2 and 3 for an overview of mine site operations and a
discussion of mine waste site activities that contribute to ecological and human health risk.
Physical habitat alteration  may also adversely affect environmental receptors. Sections 8.4.3
and 8.4.4 discuss some  of these alterations and potential impacts. Additionally, Section  8.3.2
discusses background concentrations and is relevant to ecological as well as human health  risk
assessment.  Background  concentrations may be used in the determination of contaminants of
potential concern for a site. Site contaminant concentrations may also be compared to toxicity-
based  reference values.

Some metals commonly found at mine waste sites such as zinc, iron, copper, and manganese
are essential  micronutrients for both wildlife and humans; they can be, however, toxic at  higher
levels. Bio-accumulation of metals presents greater problems for fish and wildlife at higher
trophic levels, but this usually only occurs with organic metals such as methyl mercury.

8.4.2 Problem Formulation

Ecological risk assessments require clear definitions of the receptors and transfer pathways
being assessed.  Identifying impacts common to mine waste sites  and placing them  into  a
Conceptual Site Model facilitates a focused and efficient ecological risk assessment. For each
functional unit, relevant assessment endpoints must consider spatial and temporal issues.

Spatial Issues. The large size and potential  ecological complexity of a mine waste site may
require assessment of several functional ecosystems. Both the relative and absolute
magnitude of the contaminated area and of smaller specific areas  that are critical to site
ecosystems should be examined.  The impacts of small scale contamination on highly valued
habitats (e.g., tailing piles in wetlands or streams) and of broad scale contamination  on other
habitats should each be evaluated. Key elements associated with  the spatial scale include
multiple types of releases (e.g., tailings, drainage, smelting dross and emissions) and
associated transport mechanisms. Home ranges  are a critical spatial concern.  Different types
of home ranges (e.g., hunting areas, roaming areas) may be considered based on the way a
given organism is likely to  encounter mine waste contaminants (e.g., food chain exposure or
  14U.S. Environmental Protecfon Agency (EPA). 1992. ECO Update: The Role cf Natural Resource Trustees in the Superfund
Process. Volume 1. Number 3. Office of Emergency and Remedial Responses.  PB92963369.

-------
8-6 Chapter 8: Scoping and Conducting Risk Assessment
incidental soil ingestion). Selected home ranges must be compared with identified
contaminated areas.

Temporal Issues. Ecological parameters are controlled by temporal factors. Seasonal events
such as snowmelt, runoff, and swollen creeks and rivers can serve as major energy inputs that
mobilize contaminants and contribute to higher levels of transported solids. Low flow, high
temperature periods should be evaluated as times of likely contaminant-motivated stress to
organisms, which may result in increases to organism metabolism and contaminant concen-
trations. Receptor foraging behaviors can vary during migration and spawning times. The
analysis should consider receptor behaviors and life stages which may adversely enhance
toxicity. For example, salmon eggs are more  sensitive to toxicity from metals than adult fish.

Endpoints.  Endpoint selection will direct planning of the ecological risk assessment and help
place results in context.  Identification of potential endpoints may be initiated with a description
of the general functional groups  in the ecosystem.  Environmental media and exposure routes
of mine waste contaminants should be identified during preparation of the Conceptual Site
Model.  Toxicological modes of action for site-specific contaminants of concern should also be
considered.  Based on this information and the spatial and temporal issues identified above,
species and processes, within identified functional groups, that appear to be most valued, most
sensitive, or that meet other site-related criteria (e.g., organisms that are hunted or fished,
threatened or endangered  raptors) can be selected for evaluation in the risk assessment. Final
selection species and process assessment endpoints and measurement endpoints involves
additional considerations.

Careful selection of "assessment endpoints" will help define subsequent supporting
measurements.  Each assessment endpoint will associate with one or more measurement
endpoints to facilitate evaluation of exposure and risk.  Choice of endpoints should be reflective
of the complexity (e.g., organism interdependence) and diversity (e.g., variety of plants,  animal
and aquatic life) of the ecosystem. Risks to threatened and endangered species may be
assessed through their incorporation into the Conceptual Site Model. Other decisions which
should be made prior to data collection include definition of data objectives, explicit measure-
ment selection, establishment of acceptable levels of uncertainty, and data quality control and
analysis procedures. Since background metals concentrations at mine waste sites tend to be
high, it is important to define a "significant risk level".

8.4.3 Characterization of Ecological Effects

Terrestrial Impacts and Risks. At some sites (e.g., Bunker Hill in Idaho), air transport of
particulate matter from smelting  operations and acid emissions (SO2, NO2 derived from H2SO4
and HNO3) resulted in widespread contamination of surrounding soils, vegetation loss and
stress, via add rain and phytotoxicity, over hundreds or thousands of acres. Soils with high
residual metal levels may not support native vegetation. Sites also may have large areas of
degraded or lost vegetation following massive physical alterations of terrain and subsequent
erosion. Vegetation coverage may serve as one measurement endpoint when evaluating an
area's ability to support herbivorous terrestrial organisms.  Vegetative loss may itself serve as
an assessment endpoint for evaluating the overall ecological state of the site with soil metal
concentration as one of its supporting measurement endpoints. Increased levels of zinc in soils
can cause a decrease in microbial levels and  in lichen growth. Decreased lichen growth can
indicate the soil's ability to  sustain vegetation.  Risk to other terrestrial-linked receptors should
be taken into account, even if the receptor's home range extends beyond the site boundaries.

-------
                                    Chapter 8: Scoping and Conducting Risk Assessments 8-7
Aquatic Impacts and Risks. Extensive degradation of aquatic ecosystems has occurred at
many mine waste sites.  Degradation of riparian vegetation has resulted in bank destabilization,
erosion and sedimentation of water bodies.  Run-off from tailings piles often lowers the pH of
surface waters and increases levels of metals in sediments and the water column. Metal
precipitates are often formed from acid mine drainage which adsorb to sediments and disrupt
the benthic community.  Run-off events from snow melt and storms can result in pulses of acids
and toxic substances at critical life stages for resident fish and invertebrates. High acidity from
mine acid drainage or storm water run-off at mine waste sites results in mobilization of metals in
water, potentially causing detrimental effects to the aquatic community including fish kills.  If fish
tissue samples are to be used as a measurement, an adequate supply offish for sampling
should be verified at the time of assembling the sampling and analysis plan. At the older mine
waste sites, tailings sometimes were dumped  directly into surface waters or washed into
surface waters in the initial years of mining operations. The concentration of metals in waste
piles tends to be higher at older sites because the older methods of ore processing were  not as
efficient. At many mine waste sites, it is  difficult to identify the key sources and events which
cause continued contamination of surface waters.  Other aquatic issues to consider include
effects on benthic invertebrates and related impacts via the food chain, food chain exposures to
aquatic birds and mammals, bioavailability of contaminants in sediments, chemical, and
physical properties of the water that influence  contaminant toxicity.
8.5   Human Health Risk Assessment

The following section discuss human health risk assessment issues associated with mine waste
sites. The intent of this section is to highlight issues not specifically addressed in RAGS and
other guidance.

8.5.1 Contaminants of Potential Concern

Human health risk assessments at mine waste sites focus primarily on issues addressing risks
to humans from heavy metals and process chemicals.  Heavy metals such as lead, zinc,
copper, arsenic, cadmium and mercury as well as radionuclides, PCBs, and cyanide have been
identified in soils near mine waste sites. Contamination may occur via wind blown dust, the use
of mine wastes for landscaping, road building or foundations for home building, transport by
surface waters or spillage during mining activities.  Comparison of measured contaminant
concentrations to  undisturbed background concentrations and preliminary remediation goals
may help to identify site-specific contaminants of potential  concern.  Some EPA regional offices
have developed lists of preliminary remediation goals based on default assumptions for
screening purposes.  Contact your regional risk assessor for more  information. There is also a
soil screening  levels guidance document available15.

Lead. Up to the current time, lead has been the an important contaminant of concern at
Superfund mine waste sites associated with residential use. EPA guidance16 recommends the
cleanup goal of a soil lead concentration such that a child would have an estimated risk of no
more than 5% of exceeding a blood  lead concentration of 10  g/dl.  In August 1998, EPA
issued clarification to the 1994 Revised Interim Soil Lead Guidance for CERCLA sites and
RCRA Corrective Action Facilities. The full text can be found at the following web page:
http://www.epa. gov/epaoswer/hazwaste/ca/indexhtm#p&g.
  15 U.S. Environmental Protecfon Agency (EPA).  1994. Soil Screening Guidance. Office of Solid Waste and Emergency
Response. EPA/540/R-94/101.

  16 U.S. Environmental Protecfon Agency (EPA).  1998. Clarification to the 1994Revised Interim Soil Lead Guidance for
CERCLA Sites and RCRA Corrective Action Facilities (a.k.a. "The Lead Directive"). Office of Solid Waste and Emergency
Response. August. Directive* 9200.4-27. EPA/540/F-98/030.

-------
8-8 Chapter 8: Scoping and Conducting Risk Assessment
The July 14, 1994 OSWER directive (The Lead Directive) indicates that a level of 400 ppm lead
in soil be used as a level of contamination above which there may be enough concern to
warrant site-specific study of risks. The EPA utilizes the Integrated Exposure Uptake Biokinetic
(IEUBK) Model17 to predict blood lead concentrations in children chronically (longer than 90
days) exposed to lead contaminated sources including soil, food, water, dust, air and drinking
water, and to develop agency guidance.  The IEUBK Model is discussed in the following section
on Exposure Assessment,  9.5.2.

EPA has a Technical Review Workgroup (TRW) with expertise  in the field of lead risk
assessment.  The TRW is  comprised  of senior scientists from multiple EPA regions and
program offices (e.g., OSWER, NCEA and OPPTS).  The TRW is supported by OSWER and
its work is directed by TRW members. The TRW can be contacted through regional risk
assessors and provides support for the use of the IEUBK model as well as assistance in other
lead  risk assessment issues.

In addition to the TRW, EPA has established the Lead Site Workgroup (LSW), composed of
risk managers and risk assessors from the Regions and Headquarters, as a resource to
develop agency guidance on risk management issues, and to provide the Regions with site
specific consultations18. Through the  efforts of the LSW, the  Clarification to the 1994 Revised
Interim Soil Lead Guidance for CERCLA  Sites  and RCRA Corrective Action Facilities was
issued.  The Lead Site Consultation Group (LSCG), composed  of Division Directors and senior
managers from Regions and Headquarters provides general  direction to the LSW. The LSW
and the LSCG can be contacted through  regional Mine Sites  Coordinators or through regional
OSWER contact persons who address risk issues.

Guidelines regarding  lead-based paint hazards in housing are available from HUD19. When
evaluating indoor dust for its potential to contribute to lead exposure it is important to evaluate
the contribution of lead based  paint.  It is particularly important to evaluate the presence of
lead-based paint in older communities. The LSW is preparing risk management position
papers which also provide  guidance for the evaluation of soil  and dust exposures when lead-
based paint may be present.

Other Metals. Not all mine waste sites have lead as the primary contaminant of potential
concern. It is not unusual for several  metal contaminants to be present. Arsenic, cadmium,
mercury and antimony may also be present. Although not a metal, cyanide may be a
contaminant due to its use as a process chemical.

Radionuclides.  Examples of radionuclides and their decay products that may be present at
mine waste sites include thorium, radium, radon, and uranium.  The risk assessment should not
include  the risk to background levels of radiation. Only the incremental risk to the contaminants
must be considered.  Further information  for determining PRGs for radionuclides is provided in
RAGS part B.
  17 U.S. Environmental Protecfon Agency (EPA).  1994. Guidance Manual for the IEUBK Model for Lead in Children. Office of
Solid Waste and Emergency Response, Washington, DC. EPA/540/R-93/081.

  18 U.S. Environmental Protection Agency (EPA). 1996. Memorandum from Stephen D. Luftig regarding Administrative Reforms
for Lead Risk Assessment. Office of Solid Waste and Emergency Response. April 17.

  "U.S. Department of Housing and Urban Development (HUD). 1995. Guidelines for the Evaluation and Control of Lead-Based
Paint Hazards in Housing. June.

-------
                                   Chapter 8: Scoping and Conducting Risk Assessments 8-9
Organics. Organics may include VOCs (e.g., TCE), SVOCs (e.g., PAHs), PCBs, and fuel oil
constituents.  Volatile organics can introduce the inhalation pathway via exposures directly on
site or from ground water transport to shower water supply. Individuals may be exposed to
organics via ingestion or dermal contact with  contaminated water or soil. Although organic
contaminants are not usually dominant at mine waste sites, when they are present they may
introduce significant risks that must be considered in the assessment.  PCBs and asbestos may
also be present at abandoned facilities.

8.5.2  Exposure Assessment

This section discusses some unique issues associated with assessing exposures to humans at
mine waste sites.  Exposure pathways and sources  include inhalation of fugitive dust, soil
ingestion, dermal contact with soil,  indirect exposure through plant and animal uptake (and
subsequent consumption by humans or animals), and  ingestion of and dermal contact with
contaminated ground water. Risk assessors may find useful information for assessing indirect
exposures in  RCRA guidance20.  Mining pits,  shafts, and boreholes may provide conduits
through which groundwater contaminants migrate from shallow to deep aquifers that may
contaminate drinking water. Recreational surface waters used for fishing and swimming can be
contaminated from storm water run-off, leaching from waste piles and ground water to surface
water migration routes.  Plumbing,  occupational exposure, and home hobbies should also be
assessed as potential sources of lead  in evaluating overall community exposure potential, as
well as the individual level.

Measurement of Indoor Dust and Outdoor Soil and Dust.  Much of the exposure to site-
related metals may occur from contact with indoor dust, and outdoor soil and dust.  In sites with
current residential use, site specific characterization of contaminants in indoor dust may provide
valuable information regarding the  sources of contamination and significantly influence remedial
or removal activities.  For example, the presence of lead-based paint, if determined to a source
of contamination, could affect remedial or removal activities.

The Integrated Exposure Uptake Biokinetic Model (IEUBK). The U.S.EPA uses the  IEUBK
model to predict childhood  blood lead concentrations at lead contaminated sites.  The IEUBK
uses a predictive,  integrated, multi-source and multi-exposure route approach to estimate the
probability of  exceeding user-chosen blood lead concentrations. The model results assist the
site manager in developing final cleanup goals which are protective of the typical child.  The
model provides soil lead concentrations that  represent the 95% upper confidence limit on the
mean soil lead concentration goal.  The IEUBK model should not be used for predicting blood
lead concentrations in populations  other than children  who may be chronically (greater than 90
days) exposed to lead contamination.  The TRW (or regional risk assessor) should be
consulted to ensure the consistent  and appropriate use of the IEUBK model. The LSW has
prepared risk management position papers to provide guidance to ensure consistent
management at mine waste sites.

The 400 ppm level of concern, presented  in the Lead Directive, was derived using the IEUBK
model in conjunction with a set of default assumptions. Site-specific data or default parameters
under appropriate circumstances may  be substituted.  Contact the TRW (or regional risk
assessor) for assistance.
  20 U.S. Environmental Protecfon Agency (EPA). 1994. Exposure Assessment Guidance for RCRA Hazardous Waste
Combustion Facilities, Draft. April. EPA/530/R-94/021.

-------
8-10 Chapter 8: Scoping and Conducting Risk Assessment
Estimating Adult Exposures. A methodology for assessing adult lead exposures is
available21.  In this methodology, soil/dust exposures to the adult female are evaluated and the
blood lead concentration in the fetus of the pregnant adult female are estimated.

8.5.3 Toxicity Assessment

Because mine waste sites can be very large and contaminant concentrations heterogeneous,
several different exposure scenarios may be indicated. Based on current or proposed site use,
it may be appropriate to develop exposure point concentrations which permit evaluation of
acute as well as chronic toxicity.  In EPA Superfund risk assessments both cancer and non-
cancer health effects should be evaluated for all contaminants as well as the risks of exposures
to mixtures.  Guidance is available for applying toxicity values from EPA's Integrated Risk
Information System (IRIS)22 on the World Wide Web at the following address:
http://www.epa.gov/iris/.

8.5.4 Health Studies

In addition to baseline risk assessment activities or removal risk assessment activities, mine
waste sites may have coinciding epidemiologic or human health studies. Such studies do not
replace the need for risk assessment, and are only useful where the data provide sufficient
resolution for documenting both the presence and  absence of exposure or adverse health.
Results of human health studies may be used  in developing a site cleanup strategy responsive
to the community's health protection needs. Occasionally, the results of community health
studies may reveal an imminent health threat and trigger a removal action. Health studies have
been conducted by the PRP, the Agency for Toxic Substances and Disease Registry (ATSDR),
local health districts, and state health departments.

If a related health study is to be conducted, EPA should be involved  in both the design of the
study and the final interpretation of study results.  During the scoping of the health study plan,
the community's ability to implement a health program should be taken into consideration.  All
technical (but not managerial) analyses associated with the health study should generally
undergo peer review. In lead risk assessments, structural equation modeling of the health
study results may help distinguish the contributions of different sources of human exposure.
However, structural equation modeling is resource and time intensive; it contains variability  and
uncertainty,  and potential benefits should be carefully weighed against the cost before
proceeding.  Structural equation modeling may also discriminate among various activities which
influence human activity patterns and therefore exposures.  For example, health intervention
and education, or even an increased awareness of contamination, commonly result in
avoidance behaviors (e.g., increased hand washing and dust removal or using alternate play
areas) which could result in decreased exposure. Although these are neither consistent nor
permanent remedies for reducing or eliminating exposures, such activities can influence the
results of health studies and may be identified by structural equation modeling.

In some cases, results from health studies based on children's blood lead analyses have not
been the same as IEUBK model predictions. There are several adequate scientific
explanations for this observation  which the risk manager may choose to verify through further
investigation. The TRW or regional risk assessor  can provide assistance in both the  design of
blood lead studies and in further investigations. Health studies for lead exposures have been
conducted for the following Superfund mine waste sites:  Bunker Hill in Idaho, Coeur d'Alene
  21 U.S. Environmental Protecfon Agency (EPA).  1996. Methodology for Assessing Risks Associated with Adult Exposure to
Lead in Soil. Technical Review Workgroup for Lead. Office of Solid Waste. October.

  22 U.S. Environmental Protection Agency (EPA).  1993. Use of IRIS Values in Superfund Risk Assessment. PB93963360.

-------
                                   Chapter 8: Scoping and Conducting Risk Assessments 8-11
Basin in Idaho and California Gulch in Colorado. Health studies for arsenic exposures have
been conducted at Anaconda site in Colorado and Asarco/Tacoma site in Washington state
(these sites included smelters).
8.6  Probabilistic Analysis

All risk assessments, both ecological and human health, should present an analysis of
uncertainties associated with the risk evaluations.  One approach to quantitatively address
uncertainties is probabilistic analysis. Monte Carlo simulation, a type of probabilistic analysis,
produces multiple risk descriptors instead of single numerical values to provide a range of risk
estimates.  Monte Carlo simulation calculates outcomes based on those situations with  inherent
variability and informational uncertainty.  It also can present the degree of uncertainty
quantitatively. Probabilistic analyses should only be applied when critical parameters have valid
distributions of values available and when the parameters of concern effect a significant impact
(as determined through sensitivity analysis) upon the risk results.  A sensitivity analysis  of
parameters and range values should be presented. A primary difficulty in using probabilistic
analyses in risk assessment is the ability to identify relevant databases for the development of
appropriate distributions.  Some guidance on the use of probabilistic analyses in risk
assessment is available from EPA23 24; regional guidance may also be available.
8.7   Risk Characterization

The risk characterization section of the risk assessment encompasses the presentation of
ecological and human health risks in the context of their magnitude, significance, uncertainty,
and implications for current and future site uses.  It is a critical point in directing remedial action
plans and hence, must be comprehensive and clear.  The EPA Administrator's 1995
memoranda on risk characterization, cited above, explain these concepts in more detail. These
memoranda also recommend that risks be provided in terms of a range from average
exposures to upper bound exposures.
8.8   Risk Communication

A plan for risk communication should be developed simultaneously with scoping and work plan
development.  The plan should not only consider residents, landowners, and trustees, but
should also include other stakeholders in federal, state and local agencies (including EPA
regional offices).  Information regarding community relations is provided in Chapter 6 of this
document. Because PRPs maybe involved in CERCLA activities in more than one EPA region,
communication among site managers and risk assessors in different regions is important.

Communication strategies should be further coordinated between EPA and  the PRPs.  In some
cases the PRPs may sponsor a health study on area workers or community residents.  In such
situations, it is essential that communication of risk and health information provided
simultaneously by EPA and the PRP should strive  to minimize confusion and stress on the
recipients of this information.
  23 U.S. Environmental Protection Agency (EPA). 1992. Memorandum from F. Henry Habicht regarding Guidance onRisk
Characterization for Risk Managers and Risk Assessors. Office of the Administrator. Washington, DC. February 26.

  24 U.S. Environmental Protecfon Agency (EPA). 1997. Guiding Principles for Monte Carlo Analysis. EPA/630/R-97-001, March
1997.

-------
8-12 Chapter 8: Scoping and Conducting Risk Assessment
8.9  Removal Actions

Risk assessments that support removal actions are usually separate from the baseline risk
assessment for the longer term cleanup decisions; however, such risk assessments may help
to direct, and possibly become a part of, the baseline risk assessment which supports the
remedial investigation. Because the time frame of a removal action is rapid, so is the
accompanying risk assessment.  Consequently it commonly focuses on one or a limited number
of contaminants and exposure pathways. It may account for only a human  receptor group or
only ecological receptors, or it may address both together. For example, risk of a catastrophic
or a large scale event affecting critical ecological habitat may require immediate action,
supported by an abbreviated but adequate risk assessment. For large and  complex sites, once
a removal action and supporting  risk assessment are completed, in most cases a baseline risk
assessment will be required for the overall site.

The decision to implement a removal action or a remedial (long term) action is a risk
management issue. Although not part of risk assessment, information regarding educational
and health intervention programs are included here because it specifically addresses the
exposure and toxicity issues discussed in this chapter.  Educational and health intervention
programs can be an integral part of site management strategies. If communities are educated
they can help to protect themselves while final cleanup actions are selected and implemented.
Therefore local and state health  departments should be consulted early in the process to
recommend strategies for achieving early risk reduction.  ATSDR can also be a partner in these
efforts.

8.9.1 Health Effects

The health effect of concern for a removal action may be based on a chronic health effect that
adversely affects a large number of people (or ecological receptors) or a particularly sensitive
group (e.g., young  children).  It is also possible that the health effect of concern for a removal
action may be based on acute adverse health effects requiring  more immediate medical
intervention. In contrast, the baseline risk assessment conducted during the remedial
investigation may need only to focus on a long term health effect. At present, EPA does not
have a database that provides acute human health toxicity criteria analogous to the Integrated
Risk Information System (IRIS), which provides chronic human health criteria.  Site managers
and risk assessors should determine if particular acute toxicity criteria have already been
adopted in their region, or may coordinate with  regional toxicologists to develop their own
criteria, or consult with the Superfund Technical Support Center at the National Center for
Environmental Assessment in Cincinnati.

8.9.2 Risk Management Considerations

During the initial scoping, work plan development and  sampling and analysis plan for the
removal action risk assessment,  the site manager and  risk assessor should consider needs for
risk evaluations which may follow the removal activity.  To the extent possible, removal, site
investigation, and long term cleanup activities should be coordinated and complementary. This
will help to avoid redundancy, promote efficient use of resources, and ensure that no
contaminants or exposures are inadvertently omitted from the risk evaluation.

In planning these efforts, recognize that education and health intervention programs have limits.
They cannot protect everyone, and the protective benefits can be lost if the  program should
become ineffective. Such programs are best utilized early in the process of mitigating  risk at a
site. In general, EPA recommends that engineering controls be the principal tool for risk
reduction for final site management strategies because it provides a more permanent response
than ordinary reclamation activities or transient behavioral modifications. Local health officials

-------
                                 Chapter 8: Scoping and Conducting Risk Assessments 8-13
can be instrumental in identifying particular segments of the community that may be the most
vulnerable.  They can help focus targeted cleanup actions where education and health
intervention cannot be relied upon to provide the needed protection to vulnerable members of
the community.  Health intervention can be an important component of an overall site
management strategy.
8.10 Sources of Additional Information

Additional information on the risk assessment process can be found at various EPA websites,
including http://www.epa.gov/oerrpage/superfund/programs/risk/index.htm, which discusses risk
assessment in the Superfund program. On this webpage there are links to webpages that
discuss human health risk assessments, ecological risk assessments, the "tools of the trade",
and forms to contact EPA with specific questions.

-------
8-14  Chapter 8: Scoping and Conducting Risk Assessment
                          (This page intentionally left blank)

-------
                                    Chapter 9
                        Site Management Strategies
9.1 Introduction

This chapter presents options that a site manager may consider for managing risk at
abandoned mining and mineral processing sites. The site manager may be a State, Federal, or
local authority or a private landowner and  is most likely managing the site under a number of
regulatory and non-regulatory programs. As with any remediation project, strategic  planning is
critical in abandoned mine characterization initiatives as well as clean-up activities.  As part of
this strategic planning, the site manager, depending on the spedfic statutory authority used, the
level of resources needed to protect human health  and the environment from impacts from an
abandoned mine, and the level of resources needed to address those impacts must strike a
thoughtful balance in establishing an effective site management strategy.
9.2 Managing for Risk Reduction

Generally, the ultimate goal of all characterization and clean-up activities at abandoned mine or
mineral processing sites is the reduction of risk.  As discussed in Chapter 6-Scoping Studies,
the broad project goals for an abandoned mine-site investigation are to provide the information
required to characterize the site and define the risks, and subsequently to develop a program to
mitigate risks to human  health and the environment.

Risk is comprised of three elements: a source, a receptor, and an exposure pathway by which
the receptor is exposed to the hazards from the source.  The following describes an example of
these elements  at mining sites.

      Source. At an abandoned mine site, the source may be a waste unit, such as a tailings
      impoundment, an area of contaminated soil or sediment from which contaminants may
      be released, or the actual mine pit or underground workings.

      Exposure pathways. The classic pathways for exposure at an abandoned mine site
      are transport via air (e.g., fugitive dust), ground water (e.g., contaminated plumes), or
      surface water (e.g.,  run-off).  There are situations at mine sites wherein the pathway is a
      flow of solid (e.g., waste rock pile slump) or semisolid (e.g., tailings released from an
      impoundment) waste materials released from a waste unit.

      In addition to these types of exposure pathways that take the hazard from the source to
      the receptor, the receptor may actually come to the source for exposure  (direct contact).
      Examples of this include migratory wildfowl landing on contaminated ponds or children
      playing in contaminated soils; both situations have been observed at abandoned mine
      sites.

      Receptors.  Historically, the primary receptors of concern at abandoned mine sites
      have been humans. This includes people living or working at the mine site, visitors to
      the site,  and people living downgradient of the site.

      Additional receptors now also drive the site manager's response, including aquatic
      species (e.g., fish and invertebrates); terrestrial wildlife (e.g.; invertebrates, birds, and
      mammals), and floral populations. Often at abandoned mine sites these environmental
      receptors have been affected in the past and may no longer be present at the time the

-------
 9-2   Chapter 9: Site Management Strategies
       actions are taken. Furthermore a whole new ecosystem may have been created by the
       changes at the mine site. In other cases, for example, where a threat of release is
       present (e.g., an abandoned tailings dam that about to fail), the floral, terrestrial, and
       aquatic populations maybe in actual and imminent risk of impact.

The importance of using risk-based goals and objectives in developing the risk reduction strategy
lies in the ability to reduce risk by addressing all or any one of the risk elements. A hazard from
a source that has limited pathways to a distinct receptor population may be controlled simply by
eliminating that pathway. For example, an area of metal-contaminated soil may have only
fugitive dust or direct exposure as its pathway to any receptor;  a covering of clean soil and sod
over the soil may virtually eliminate this pathway.  While this example does not account for the
potential for soil biota to move the contaminants into the food chain, the reduction of major risk
pathways (i.e.; fugitive dust and direct exposure) may be considered sufficient for the goal of
minimizing risk.

In more complex cases commonly found at abandoned mine sites, the site management strategy
must address the source, pathway, and receptors; and most likely multiples of each.  For
example, both a mine pit and a tailings impoundment may  be active hazard sources, while
fugitive tailings dust, metal-contaminated groundwater, and acidified surface water may be
moving the hazard offsite, thus impacting human and environmental receptors.

To complicate the strategy more, the historic nature of many abandoned mine sites means that
exposures have been occurring over time and cumulative effects may need to be taken into
account. For example, human populations may have bioaccumulated contaminants.  Likewise,
ecological resources may have been severely impacted to a point that they are no longer
present.  An example of this is the effect that dusts laden with  zinc, a phytotoxin, have had in
eliminating vegetation downwind from certain historically active pyrometalurgical operations.
Other examples may be fish populations eliminated  from surface waters impacted by acidic or
toxic runoff from  abandoned mines.
9.3 Categories of Activities that Address Risk Elements

In devising a response strategy to minimize risk, site managers should address the different
elements of risk (i.e., source, exposure pathway,  and receptor) using one or more of several
broad categories of response actions. A variety of actual technological applications, engineering
controls, or other activities may be used within each of these response categories.  These
technologies are discussed in Chapter 10 of this handbook.

Managing the Source. The source of contamination may be addressed by reducing, either in
part or entirely, the actual source material through removal (e.g., excavation and removal of
chemical-containing drums) or certain types of treatment (e.g., reprocessing of tailings).
Because of the large volume of source material (e.g., tailings, waste rock, and smelter slag)
that may be of concern at abandoned mine sites, source removal and/or treatment is often
infeasible, thus requiring the site manager to strategically focus on collection, diversion, and
containment (e.g., capping) activities.

Managing Exposure Pathways. Controlling exposure pathways at abandoned mining and
mineral processing sites maybe performed by implementing a variety of collection, diversion, or
containment activities. These engineering controls often take the form of some sort of capping
(e.g., preventing air release or direct contact), damming (e.g., stopping/diverting surface water
runoff), or constructing slurry walls (e.g., groundwater management).

-------
                                               Chapter 9: Site Management Strategies   9-3
An additional management strategy and one of particular importance to managing abandoned
mines is control of waste management units (e.g., shoring up tailings impoundment dams or
waste rock side dumps that are in danger of failing).  This effort prevents the transport of waste
materials to new, non-managed locations, as well as preventing the contamination of soil and
sediment, wetlands, surface water, and groundwater.

In addition to the control, diversion, and containment responses, exposure pathways may be
managed by cleaning up the contaminated media, especially groundwater and surface water
which are active transport media (certain contaminated media,  such as soil and sediment, are
more often considered sources from which air and water may be contaminated and
contaminants subsequently transported).

Managing the Receptor Exposure.  Controlling the hazard to  receptors, whether human or
environmental, may include a variety of risk abatement or remediation activities. Individuals
may be removed (e.g., evacuated or relocated) if exposure pathways or sources cannot be
addressed, this is uncommon. Typically this action is not performed unless extremely high risk
is present, a situation not typical of abandoned mine sites. In fact, at many large Superfund
mine sites, residents live within the sites and are expected to remain.  This presence of human
populations,  however, may suggest that health intervention and education should be considered
to manage exposure until sources and exposure pathways have been controlled.

Similarly, in the case of environmental receptors, population studies may be performed to
assess the impacts and risk to the local flora and fauna.  In cases where the environmental
receptors are significantly reduced or eliminated by historical exposure, the environmental
populations may be reintroduced (e.g., restocking, revegetating) or habitat reestablished such
that natural repopulation may occur. An example of the  latter is stream reconstruction, which is
common in parts of the West, during which watersheds are returned to their natural states (e.g.,
heavy sedimentation removed, riffles and other structure rebuilt, associated wetlands
reconstructed).  Note that certain stabilization and media cleanup activities may be used to
focus on wildlife rather than human health.  Examples of this are wildlife fencing to route
migratory mammals around mine areas, or draining  or netting contaminated ponds to keep
waterfowl from the water.
9.4    Time-Based Responses

Armed with the understanding of the categories of responses employed to address specific risk
elements, the site manager should further develop the strategic management plan by
incorporating the factor of time.  In general, site managers should first consider whether any
time-critical actions are necessary.  If the time critical actions do not completely minimize the
risk or are not selected, the site manager should then design a long-term response to
remediate the site, and determine whether any expedited response action may be appropriate
in the interim (i.e., while long-term response are studies and selected). These three time
factors are described as follows:

       Time-critical actions. These are immediate actions necessary to address an actual or
       threatened release. These typically involve removing or stabilizing a threat to human
       health or the environment.
       Interim responses. These are activities that are not time critical but for various
       reasons (e.g., community needs/desires, because of risk abatement, or to address new
       findings) need to be performed before a formal study and remediation can be
       completed. Typical of an interim action are stabilization activities or health-based
       expedited response actions.

-------
 9-4   Chapter 9: Site Management Strategies
       Long-term responses. These responses typically include comprehensive site
       characterization and evaluation of a variety of long-term clean-up activities. This type of
       action often requires significant time for the characterization step and to address long-
       term remediation needs (e.g., permanent reduction of toxicity, mobility and volume of
       contamination through treatment).

9.4.1  Time-Critical Actions

The first consideration for addressing contamination is the determination of whether or not any
immediate threats exist at the mining or mineral processing site. Immediate threats may be an
actual, ongoing, or threatened release.  Should some immediate threat be identified, the site
manager should consider taking action to reduce the immediate risks.

Time-critical actions are characterized by a need for a rapid response to address the immediate
threat. Expedited characterization and incremental cleanups are the norm. Under certain
regulatory scenarios, these actions are mandated to be short term.  Although generally short
term, under certain circumstances these actions can be extended. States may use time-critical
actions under their own jurisdiction in order to address an immediate threat to its citizens or
resources.
Characterization activities, while expedited
to address the circumstances, arejust as
important in planning for time-critical
actions as for long-term cleanup actions.
The evaluation of threat includes some
form of risk analysis, either formal or
estimated under the auspices of "best
professional judgement."  This evaluation
should take into account the potential for
release (a moot point if the release is on-
going),  the potential for migration, and the
presence and vulnerability of the receptors.
Characterization activities potentially
include monitoring, assessment,
evaluation, and other information gathering
activities.
Once an immediate threat is identified and/or confirmed, a number of actions may be taken to
reduce the risk posed by that threat.  Risk reduction activities may include removal or
stabilization activities such as  removal of sources materials (e.g., excavation and disposal of
contaminated materials or waste), removal of contaminated media (e.g., removal of soil
contaminated by metals from smelter emissions), reinforcement of containment units (e.g.,
shoring up tailings dams in danger of failing), or construction of containment structures (e.g,
damming ditches or waterways to create reservoirs to contain contaminated runoff).  Highlight
9-1 illustrates the use of removal activities in the Butte and Walkerville  mining areas in
Montana.
               Highlight 9-1
            Butte and Walkerville

CERCLA removal actions have been extensively
used at the Silver Bow/Butte NPL mine sites.  Time-
critical removal actions begun at the site in 1988
were based on two facts.  First, the cities of Butte
and Walkerville are partially located within the site
boundaries so exposure potential was high; second,
elevated levels of lead and aisenic were detected in
the mine waste and in residential yard soils.  Based
on the potential health effects from the lead and
arsenic, EPA believed it was essential that the waste
dumps be removed from residential neighborhoods
quickly rather than waiting forthe long term
remediation effort to unfold.

-------
                                                  Chapter 9: Site Management Strategies   9-5
With increasing frequency, site managers are likely
abandoned mines sites that pose an immediate risk
                    Highlight 9-2
                 Talache Mine Site

  In May, 1997, a large tailings pile failed at the Talache
  Mine in Idaho (last operatbnal in the 1960's), releasing
  tailings containing high concentrations of arsenic and
  other heavy metals.  The tailings washed over and
  impacted approximately 45 acres of woodlands, 25 acres
  of wetlands, and 3,000 feet of stream bed. IDEQ, initially
  took the lead in directing the clean-up of the site, by
  entering into a "consent decree" with the landowner.
  Among other stipulations, the landowner was required to
  immediately implement (during the summer of 1997) a
  number of "interim corrective actions" to help prevent the
  migration of additional tailings into the creek the following
  spring.
  to be asked to address impacts from
   to the environment.  Highlight 9-2 is a brief
    discussion of how time-critical action in
    the form of release containment was
    used at the Talache Mine Site in Idaho.

    It should be noted  here that CERCLA
    also gives EPA the authority to address
    threats at sites that are not closed or
    abandoned. This may be of particular
    importance in the mining sector where
    mine sites may be inactive  rather than
    abandoned because of the economics of
    the metals markets.  Should a release be
    justifiably regarded as imminent  or
    substantial threat of release  (i.e., a
    tailings dam failure pending), a Federal
    or a State agency may step in and take
    time-critical action  to mitigate the risk.
9.4.2  Interim Responses
After considering time-critical activities, site managers should consider whether any
opportunities exist for conducting activities that, while not time critical or directed at eliminating
the source of contamination, may temporarily decrease exposure from certain pathways.
Interim response actions may take any number of forms depending on the needs of the site
manager to control or mitigate a situation.
Control, diversion, and containment activities
typically focus on controlling exposures or
the migration  of a release.  These activities
may be traditional engineering controls (e.g.,
slurry walls, caps) or may utilize less
traditional means (e.g., phytostabilization-
see Highlight  9-3). These actions do not
necessarily result in a facility being returned
to ambient conditions; contamination may
still be present and additional investigations
or remediation may be required. As  long as
the containment measures are maintained,
however, stabilized facilities commonly do not present unacceptable short-term risks to human
health or the environment.  This allows site managers the opportunity to shift their resources to
health or environmental concerns elsewhere on the site (See Exhibit 9-1 for a review of EPA's
RCRA Corrective Action program's Stabilization Initiative).
                Highlight 9-3
              Phytostabilization

An example of stabilization is phytostabilization, the
planting of tolerant grasses on tailings to reduce or
eliminate contaminated fugitive dust emissions. This
process is considered a stabilization activity because
the contaminants are still in the tailings impoundment
and the grass does not serve as an isolating cap.
The impacts on downwind receptors from the fugitive
dust are, however, reduced or eliminated.

-------
9-6    Chapter 9: Site Management Strategies
                                  Exhibit 9-1.  RCRA Perspective
The Program
The Problem
The Need
The Solution
The Goal
EPA Office of Solid Waste Corrective Action program
Early implementation of the RCRA Corrective Action program focused on
comprehensive cleanups at a limited number of facilities. These final cleanups were
difficult and time- consuming to achieve. The emphasis on final remedies at a few
sites diverted limited resources from addressing releases and environmental threats
occurring at many other sites.
EPA sought to achieve an increased overall level of environmental protection by
implementing a greater number of actions across many facilities rather than
following the more traditional process of pursuing final, comprehensive remedies at
a few facilities.
In 1991, the Agency established the Stabilization Initiative as one of the primary
implementation objectives for the Corrective Action program.
EPA seeks to increase the rate of corrective actions by focusing on near-term
activities to control or abate threats to human health and the environment and
prevent or minimize the further spread of contamination.
Whereas the goal of control, diversion, and stabilization activities is to control or abate threats
to human health and the environment and prevent or minimize the further spread of
                                                 contamination, Expedited Response Actions
                                                 (ERAs) may go beyond that goal in that they
                                                 may include programs to address the actual
                                                 health or environmental impacts caused by
                                                 the contamination at issue. A leading
                                                 example is the lead monitoring and
                                                 abatement program put in place as part of
                                                 the Superfund response activities at the
                                                 Silver Bow/Butte NPL mine site in Montana
                                                 (See Highlight 9-4). In this particular case
                                                 one of the potentially responsible  parties
                                                 (PRPs) funded the program. In other cases
                                                 (e.g., in the absence of any established
                                                 PRPs), the State or land  management
                                                 agency may need to establish the funding.
                Highlight 9-4
         Butte/Walkerville ERA Action

In 1994, EPA, in conjunction with the State of
Montana and the City of Butte, MT, conducted an
Expedited Response Action (ERA) to address
elevated levels of lead in residential areas of the City
of Butte and the Town of Walkerville. The ERA is a
multi-pathway approach which includes: a blood lead
surveillance for children less than 72 months old; a
lead education/ awareness program for the
communities; identification/ monitoring of specific
lead sources including lead paint, indoordust, soil
and drinking water; abatementAnitigation of identified
sources of lead; establishment of a Lead Advisory
Committee; and the cleanup of source area (waste
rock dumps and other related mine waste) in
residential areas.

This ERA was necessary because a ROD would not
be completed until 2001 and there was concern about
the elevated blood leads in Butte and the potential for
exposure to children from lead sources. This five
year project will be evaluated in the Record of
Decision (ROD) for the site in 2001 to determine if
these actions are addressing the lead sources on this
site.
                                                 Because of the nature of ERAs in
                                                 addressing health or environmental impacts
                                                 during an interim period while final action is
                                                 being formulated and evaluated, they may
                                                 often run  concurrent to risk assessments
                                                 done as precursors to full-scale remediation.
                                                 It is important that the ERAs be a
                                                 component of, or at least consistent with,
                                                 anticipated final remedies.

-------
                                                 Chapter 9: Site Management Strategies   9-7
9.4.3  Long-Term Responses

The third strategic consideration for mine-site cleanup is long-term remediation and restoration.
These actions are not time-critical and, while linked to or consistent with interim measures, they
are not interim in nature. Long-term responses are the final comprehensive cleanup, or if
cleanup is deemed unnecessary or uneconomical, the final stabilization and monitoring efforts.
Long-term responses also include restoration activities such as revegetation, rebuilding of
wildlife habitat, and restocking offish and wildlife.

The framework of the long-term response varies depending on regulatory and programmatic
requirements, the site specific conditions, and the degree  of risk posed to human health and the
environment.  The following activities are generally  undertaken to varying degrees.

       Scoping. This is the initial planning phase during  which available data is collected and
       reviewed, regulatory requirements evaluated, work teams and community involvement
       planned and any required health, safety and/or environmental impact plans developed
       (see Chapter 6 for more on this subject).

       Site Characterization. During this phase additional information may be acquired by
       implementing sampling or analysis programs, or more regular long-term monitoring (see
       Chapter 7 for additional information regarding sampling and analysis).

       Risk Assessment.  During this phase the risks to  human health and the environment
       are evaluated (see Chapter 8 for additional information regarding risk analysis).  In
       addition, a risk assessment maybe used to evaluate the potential effectiveness of
       certain response activities.
       Response Selection. During this
       phase the types of appropriate
       responses, both broadly (see Section
       9.3 above), and specifically (See
       Chapter 10 for additional information
       regarding Remediation and Cleanup
       Options) are selected. Typically a
       range of responses are available and
       should be evaluated.  Highlight 9-5
       presents the CERCLA evaluation
       criteria, some  or all of which may be
       included in non-CERCLA response
       evaluations, depending on legal
       requirements or site specific needs.

       Response Evaluation. During this
       phase the responses  that were
       implemented are assessed based on
       monitoring of the results.

Note that these elements of a long-term
remediation effort are typical of the Remedial
Investigation and Feasibility Study (RI/FS)
and Record of  Decision (ROD) development
conducted under CERCLA NPL site
remediations and the RCRA  Facility
               Highlight 9-5
         CERCLA Evaluation Criteria

CERCLA established specific statutory requirements
for remedial actions; remedial actions must; 1) be
protective of human health and the environment; 2)
attain Applicable or Relevant and Appropriate
Standards, Limitations, Criteria, and Requirements
(ARARs) or provide grounds for invoking a waiver; 3)
be cost-effective; 4) utilize permanent solutions and
alternative treatment technologies or resource
recovery technologies to the maximum extent
practicable; and 5) satisfy the preference for
treatment that reduces toxfcity, mobility, or volume as
a principal element or provide an explanation in the
ROD as to why it does not.

EPA, subsequently developed nine evaluation criteria
to address these statutory requirements and the
additional technical and policy considerations that
have proven important for selecting among remedial
alternatives. These criteria  are:  1) Overall Protection
of Human Health and the Environment, 2)
Compliance with ARARs, 3) Long-Term Effectiveness
and Permanence, 4) Reduction of Toxicity, Mobility,
and Volume, 5) Short-Term Effectiveness (during
implementation), 6) Implementability, 7) Cost, 8)
State or Support Agency Acceptance, and 9)
Community Acceptance.

-------
 9-8   Chapter 9: Site Management Strategies
Assessment (RFA) and Corrective Measures Study (CMS) conducted under the RCRA
Corrective Action remediations. As an alternative, a NEPA approach maybe considered as
presented in Exhibit 9-2 below.
                      Exhibit 9-2.  Insight from a Similar Review Process
The Program
The
Comparison
Consideration
Issues
The Plan
National Environmental Policy Act of 1969 (NEPA) review process
Because of the broad similarities between the remedial investigation/feasibility study
(RI/FS) process and the NEPA review process, EPA has determined that
CERCLA/SARA is functionally equivalent to NEPA.
Specifically, NEPA requires Federal agencies to consider five issues during the
planning of major actions:
1) the environmental impact of the proposed action;
2) any adverse impacts which cannot be avoided with the proposed implementation;
3) alternatives to the proposed action;
4) the relationship between short and long-term effects; and
5) any irreversible and irretrievable commitments of resources which would be
involved in the proposed action.
Generally, the NEPA EIS process produces a document that is similar to a CERCLA
RI/FS REPORT or Record of Decision (ROD). Both processes result in a decision
document outlining the basis for selection of a preferred alternative
9.5    Strategic Planning Considerations

9.5.1  ARARs

Throughout any remedial action undertaken pursuant to CERCLA at an abandoned mining and
mineral processing site, the site manager must consider compliance with CERCLA ARARs.
ARARs are Federal, State, and local standards that are directly applicable or may be
considered relevant and appropriate to the circumstances on the site.  The National
Contingency Plan, at 40 CFR 300.5, defines ARARs as:

       Applicable requirements— Those cleanup standards, standards of control, and
       other substantive requirements, criteria, or limitations promulgated under federal
       or state environmental orfacility siting laws that specifically address a
       hazardous substance, pollutant,  contaminant, remedial action, location, or other
       circumstance found at a CERCLA site. Only those state standards that are
       identified by a state in a timely manner and that are more stringent than federal
       requirements may  be applicable.

       Relevant and appropriate requirements- Those cleanup standards, standards of
       control, and other substantive requirements, criteria, or limitations promulgated
       under federal or state environmental or facility siting laws that while not
       'applicable' to a hazardous substance, pollutant, contaminant, remedial action,
       location, or other circumstance found at a CERCLA site address problems or
       situations sufficiently similar to those encountered at the CERCLA site that their
       use is well suited to the particular site.
Only those state standards that are identified by a state in a timely manner and that are more
stringent than federal requirements maybe applicable or relevant and appropriate.

-------
                                              Chapter 9: Site Management Strategies  9-9
These standards are an inherent part of the scoping process, but also affect the long-term
remediation, especially in the setting of cleanup standards as well as in meeting other
environmental land use regulations (e.g., regulation pertaining to wetlands and water resources,
floodplains, endangered and threatened species/critical habitats, coastal zones, cultural
resources, wild and scenic rivers, wilderness areas, and significant agricultural lands).

The consideration of these ARARs should begin in the initial scoping process and be
considered throughout design and implementation of the remedial action. Since many
abandoned mining and mineral processing sites are located in areas that otherwise may not be
considered industrial, some of the ARARs that need to be considered are not common to other
sites.  For example, a mining site which is located close to a wilderness area with habitat for
endangered  species and buildings that have been placed on the register of historic places may
pose some significantly different management concerns than a site located in  a major city.
Because of this, the site manager must be aware of all potential ARARs and constantly
considering other Federal, State, and local laws, regulations, and policies that will impact the
actions at the site. A discussion of Federal ARARs can be found in Appendix D.

9.5.2   Sfafe and Other Agencies

The site manager needs to become familiar with the Federal, State, Tribal, and local land
management agencies involved with mining and mineral processing site and affected
resources. The site manager should identify the appropriate agencies and personnel who
should be  involved with the remediation process at the mining or mineral processing site as
soon as possible. These agencies should be kept involved during  planning characterization
and clean-up activities that  involve the area with which they are concerned.

The NCR in addressing removal actions, states that "EPA shall consult with a state on all
removal actions to be conducted in that state." The NCR clearly delineates state involvement in
removal actions on 40CFR 300.525, where the requirements are described and agreements
with EPA discussed. A primary role described for states in 40 CFR 300.525(d) is regarding
ARARs, where it states:

       States shall be responsible for  identifying potential state ARARs for all Fund-
       financed removal actions and for providing such ARARs to EPA in a timely
       manner for all EPA-lead removal actions.

The NCP, in addressing remediation efforts, addresses requirements and agreements
regarding state involvement in the RI/FS process, and the selection of remedy, and remediation
design and remedial action  (40 CFR 300.515(e-g)). State involvement the RI/FS process
specific to ARARs are specifically Section 300.515(d), wherein subsections (1) and  (2) address
identification of ARARs and subsections (3) and (4) address waivers for ARARs.

The NCP,  at 40 CFR 300.515(b) stipulate what requirements an Indian tribe must meet in order
to be afforded the same treatment as states under section 104 of CERCLA.

-------
 9-10   Chapter 9: Site Management Strategies
9.5.3  Brownfield Initiative

An emerging management tool that may be available to the site manager is the Brownfield
Initiative. This program encourages the cleanup and reuse of property that may require
environmental cleanup before it can be redeveloped (i.e., brownfidds).  In the past,
redevelopment of these properties often was avoided due to concern about environmental
liabilities.  Under CERCLA's liability structure present and future owners of contaminated
properties can be held liable for cleanup even if they did not cause the contamination.  The
Brownfield Initiative is an emerging EPA effort to reduce, wherever possible, the barriers to
redevelopment of contaminated properties. Where abandoned mine sites are in an area in
which the property may have some redevelopment potential (e.g., the city of Butte, Montana
has a number of abandoned mine sites within the city's boundaries), site managers should
explore opportunities to use the Brownfield Initiative to assist their planning and remediation
activities.  Additional information can be obtained from the EPA Brownfields website,
http://www.epa.gov/swerosps/bf.

9.5.4  Enforcement Considerations

Storm water runoff and discharge of other drainage from inactive and abandoned  mines is often
subject to State or Federal regulatory program requirements.  Historically, these programs have
been applied  infrequently at inactive or abandoned mines.  For example, while adits at inactive
and abandoned mines often have discharges that are technically subject to CWA's NPDES
requirements, most do not have a permit. Similarly, storm water discharge permits are required
at many mines but have never been applied for or issued. In order to develop an effective site
management strategy site managers should evaluate the discharges from a mine  in the context
of applicable State and Federal regulations.  In those instances where the mine site has
demonstrated contribution to environmental problems, enforcement of existing regulations
should be considered an essential element of mitigating risk.  Making owners and operators
accountable for the discharges from their facilities should always be considered early in the site
management strategy development process.

In those instances where current owners or operators are unwilling to comply with provisions of
the CWA (or an applicable State statute) addressing mine-site run-off the site manager may
want to consider enforcement actions to compel private parties to be responsible for the
environmental impacts of their facilities.  For those mine sites where the current owner is unable
to meet current regulatory requirements the site manager may want to evaluate the feasibility of
invoking State or Federal statutes that look to the historic site owner or manager to take
responsibility for damaging releases to the environment.  CERCLA is the Federal statute that
may be applicable in such instances; many states have similar authorities.

Other regulatory programs (discussed in Chapter 11) may also be applicable to environmental
concerns at mine sites. Such programs vary considerably among states.  The site manager is
advised to develop a site specific enforcement strategy in partnership with other Federal and
State agencies having jurisdiction over releases from the site.  Developing an effective
enforcement strategy can be an effective way of meeting the environmental  challenges
presented by inactive and abandoned mine sites, and is fundamental to meeting public
expectations that owners and operators take responsibility for their facilities.

-------
                                           Chapter 9: Site Management Strategies   9-11
9.6 Additional Sources of Information

      Specific procedures and guidance for EPA's removal program are set forth in a ten-
      volume series of guidance documents collectively titled, Superfund Removal Procedures
      (The chapter on Removals in EPA's Enforcement Project Management Handbook
      summarizes this guidance.) These stand-alone volumes update and replace Official
      Solid Waste and Emergency Response (OSWER) Directive 360.3B, the single-volume
      Superfund Removal Procedures manual issued in February 1988.

      More information on the RCRA Stabilization Initiative is available in the 1991 guidance
      memorandum, Managing the Corrective Action Program for Environmental Results: The
      RCRA Facility Stabilizatbn Effort.

      CERCLA Compliance with Other Laws Manual, Part I, Overview, RCRA, Clean Water
      Act, and Safe Drinking Water Act. U.S. Environmental Protection Agency (EPA),
      August,  1988. Washington, D.C. OSWER Directive 9234.1-01.

      CERCLA Compliance with Other Laws Manual, Part II, Clean Air Act and Other
      Environmental Statutes and State Requirements CERCLA Compliance With Other Laws
      Manual Part II. U.S. Environmental Protection Agency (EPA), August, 1989.,
      Washington,  D.C. OSWER Directive 9234.1-02.

      Guidance for Conducting Remedial Investigations and Feasibility Studies Under
      CERCLA. U.  S. Environmental Protection Agency (EPA), October, 1988.  Washington,
      D.C. Office of Emergency and Remedial Response.
      EIA Guidelines for Mining, U.S. EPA, September 1994. Washington D.C.  Office of
      Federal Activities.

      Abandoned Mine Lands Preliminary Assessment Handbook, California Environmental
      Protection Agency, January 1998, Department of Toxic Substance Control.

      Rules of Thumb for Superfund Remedy Selection, U. S. EPA, August 1997, Office of
      Solid Waste and Emergency Response

      A Guide to Preparing Superfund Proposed Plans, Records of Decision and Other
      Remedy Selection Decision Documents, U. S. EPA, July 1999, Office of Solid Waste
      and Emergency Response.

      Draft EPA and Hard Rock Mining: A Source Book for Industry in the Northwest and
      Alaska, U. S. EPA, November 1999, Region 10 Office of Water

-------
9-12    Chapter 9: Site Management Strategies
                          (This page intentionally left blank)

-------
                                   Chapter 10
                    Remediation and Cleanup Options
10.1 Introduction

The purpose of this chapter is to assist the user with a basic understanding of the types and
availability of remediation technologies for mining and mineral processing sites. An
understanding  of the technologies available for mine site cleanup should help the site manager
design a successful and cost-effective site management strategy.

Following a background section (Section 10.2) the chapter addresses four general topics:
conventional technologies (Section 10.3); innovative/emerging technologies (Section 10.4);
institutional (i.e., non-engineering) controls (Section 10.5); and sources of information regarding
available technologies (Section 10.6).

Several appendices address innovative ways to clean up mining and mineral processing sites.

       Appendix B includes information and references  addressing conventional and innovative
       remediation of Acid Mine/Rock Drainage.

       Appendix G provides more specific information regarding conventional mine remediation
       technology.

       Appendix H contains a discussion of innovative technologies in EPA's SITE Program
       that may be applicable at mining and mineral processing sites.

       Appendix  K includes Information and references  to Best Demonstrated Available
       Technologies (BDATs) as developed under the RCRALand Disposal Restriction
       program.

       Appendix L presents efforts under the Mine Waste Technology program to find
       innovative remediation techniques.

       Appendix M includes additional remediation references, addressing RCRA Corrective
       Action program, general groundwater remediation, and remediation of cyanide heap
       leach operations.
10.2 Background

EPA, other Federal agencies, States, and Tribes have been managing investigations and
cleanup activities at mining and mineral processing sites for over two decades.  A large number
of cleanup technologies have been successfully employed in the remediation and management
of mining wastes.  Because of the unique problems associated with the cleanup of mining and
mineral processing wastes, new technologies, as well as new approaches to utilizing older
technologies, are constantly being developed. Progress in  understanding the behavior of
contaminants has led to a series of new technologies being developed to address Superfund
sites in general and mining and mineral processing sites in  particular.

It is important that the site manager understand differences in the types of remediation
technologies when evaluating them. Certain emerging technologies may be effective on a
small scale but may not have been tested in a large-scale application. In other cases, the site
manager needs to be aware that innovative technologies tested on one type of waste or media

-------
10-2   Chapter 10: Remediation and Cleanup Options
may not be directly applicable to other types of mining and mineral processing site waste or
media. For the purpose of this discussion, two broad categories of technologies (i.e.,
conventional and innovative/emerging) characterize the universe of available and applicable
remediation solutions. A third category, institutional controls, will be discussed as it relates to
more traditional non-engineering controls.

Conventional Technologies. These are technologies with a successful track record in mine
site cleanup, or technologies that are considered standard practice for mine site management.
Such approaches have been widely applied to remediation of mining and mineral processing
sites, as well as other waste management units.  Lime treatment for acid wastes is an example
of conventional technology.

Innovative/Emerging Technologies. Two types of technologies are included in this category.
Innovative technologies include processes or techniques for which cost or performance data is
incomplete and the technology has not yet been widely applied.  An innovative technology may
require additional field scale testing before it is considered proven and ready for
commercialization and routine application at mine sites.  Emerging technologies typically are
even earlier in the development process. While they are potentially applicable  at mine sites,
additional laboratory or pilot-scale testing to document effectiveness is highly recommended.
Current initiatives at EPA and other Federal agencies encourage the consideration of
innovative/emerging technologies in site remediation.

Institutional Controls.  For the purpose of this discussion,  institutional controls are  non-
engineering site management techniques or strategies used to protect human health and the
environment.  Examples of institutional controls include fencing, zoning, health education,
easements and other deed restrictions, and interior cleaning (i.e., removing contaminated dust
from interior of residences). These controls can be an integral part of an overall site
management  strategy.

Information addressing the conventional and innovative/emerging technologies includes the
following (described below): a basic description, a relative-cost analysis, and a general
effectiveness evaluation as described below.  Exhibit 10-1, found at the end of this chapter,
summarizes this  information.

       General cost information is presented as well in the form  of a  comparison to the other
       technologies;  cost information is  based on 1998 data. The costs are presented as low,
       medium, high, or very high. These costs do not include site-specific considerations that
       may significantly impact the costs, including availability of power, materials, manpower
       and/or equipment.

       The general effectiveness of the technology at mining and mineral processing sites  is
       presented.  Because the major contaminants of concern at most mining sites are
       metals, the effectiveness discussion for each technology on that contaminant class.
       Local site conditions can significantly impact the actual effectiveness at each mining and
       mineral processing site.

In many cases the remediation process will utilize multiple technologies to develop a treatment
train (e.g., a series of technologies used in sequence in the remediation process).
Conventional  technologies, innovative/emerging technologies, and institutional controls may all
be used in a integrated management strategy. As an illustration, a contaminated area maybe
bioremediated, with associated contaminated ground-water being pumped and treated
chemically, followed by filtration, and solidification and landfilling of the sludge, utilizing fencing
to restrict access to the landfill and contaminated area and creating an easement to  access
certain areas.

-------
                                       Chapter 10: Remediation and Cleanup Options  10-3
10.3 Conventional Technologies

The fundamentals of conventional treatment, collection and diversion technologies are
discussed in this section.  In addition, those management techniques that remove the
contaminant from the site, such as the sale of useable materials or decontamination of
structures, are included as conventional technologies.

10.3.1 Treatment Technologies

For the purpose of this discussion, treatment technologies are those technologies that either
change the composition of the contaminant to form other compounds that are less dangerous
to human health or the environment, or limit contaminant mobility by physical or chemical
means.

Chemical Treatment. In chemical treatment, reagents are used to destroy or chemically
modify organic and inorganic contaminants, converting hazardous constituents into less
environmentally damaging forms. Typically, chemical treatment is used as part of a treatment
train, either as a pretreatment technique to enhance the efficiency of subsequent processes or
in post-treatment of an effluent.  One of the common uses of chemical treatment at mining and
mineral processing sites is the use of lime to neutralize acid  rock drainage (ARD) and to
precipitate the metals. The cost of chemical treatment ranges from low to high depending site
conditions, including the chemicals that are used and the nature of the products  that are
produced by the chemical treatment.  As an example, if the sludge that precipitates after the
addition of lime is disposed as a solid waste, the additional cost of disposal would bring the cost
into the high range. In many cases the operating and maintenance (O&M) costs will be
significant over the life of the remediation.

Larger chemical treatment operations may benefit from a high density sludge (HDS) treatment
system. A HDS process significantly reduces the volume of sludge compared to a basic lime
treatment by recirculating sludge and lime. For example, at the Iron  Mountain Mine site in
California, a HDS treatment system reduced the costs associated with  treatment by more than
15 percent while at the same time doubling the expected useful life  of the on-site landfill and
producing a more chemically and physically stable sludge.

Stabilization. Stabilization refers to processes that reduce the risk posed by a  waste by
converting the contaminants into a less soluble, less mobile, and, therefore, less hazardous
form without necessarily changing the physical nature of the waste. [Site managers should be
aware that the term "stabilization" is also used to describe interim remediation activities (e.g.,
capping) that may be used to stabilize a site in order to minimize further releases prior to actual
clean up.] An example of stabilization as a treatment is  the pH adjustment of a sludge which
results in making the contaminants in the sludge less mobile. The cost of stabilization will be in
the medium to high range depending on treatment required for stabilization. The effectiveness
of stabilization is dependent on the nature of the materials to be stabilized and the subsequent
storage or disposal. Cement-based stabilization is often used for many metals to comply with
the treatment requirements of the Land Disposal Restrictions (LDRs).

Solidification. Solidification refers to processes that encapsulate waste in a monolithic solid of
high-structural integrity.  Solidification does not necessarily involve a chemical interaction
between the waste and the solidifying reagents, but involves a physical binding of the waste in
the monolith. Contaminant migration is restricted by vastly decreasing the surface area
exposed to leaching and/or by isolating the waste within an impervious capsule.  Encapsulation
may address fine waste particles (microencapsulation) or large blocks  or containers of wastes
(macroencapsulation). There is, however, inherent risk  that the stabilized solidified waste
matrix will break down overtime, potentially releasing harmful constituents into the

-------
10-4   Chapter 10: Remediation and Cleanup Options
environment.  An example of the solidification technology involves the use of cement to solidify
contaminants into a large block.  The cost of solidification ranges from medium to high
depending of the steps required to encapsulate the waste. A simple encapsulation into a large
concrete block would be an example of the medium end of the cost range.  The effectiveness of
solidification is dependent on the potential for the solid to break down over time and allow the
encapsulation to be breached.

Thermal Desorption. Thermal desorption refers to treatment alternatives that use heat to
remediate contaminated soils, sediments, and sludges.  Thermal desorption is used to separate
a contaminant from the containing media. The off-gas from the desorption unit typically must
be further treated.  Temperatures utilized for thermal desorption of metals is high enough that
other contaminants, such as volatile organic compounds, may actually undergo thermal
destruction, as discussed below. Thermal desorption is not commonly used at mining and
mineral processing sites since the common contaminants at these sites, metals, are not easily
heated to their gas-phase.  The cost of thermal desorption is in the range of medium to high
and the effectiveness at most sites is poor since there may be only a limited quantity of
chemicals in the soils that can be easily heated to their gas-phase.

Thermal Destruction.  Thermal destruction is a treatment alternative that uses heat to
remediate contaminated soils, sediments, and sludges.  Thermal destruction typically uses
higher temperatures to actually decompose the contaminants, potentially with no hazardous
contaminant residues requiring further management.  Thermal destruction  is not commonly
used at mining and mineral processing sites since the process does not destroy metals, the
most common contaminant. The cost of thermal destruction is in the range of medium to high
and the effectiveness is limited to those materials that can be destroyed.

Vapor Extraction. Vapor extraction is an in-situ process that uses vacuum technology and
subsurface retrieval systems to remove contaminant materials in  their gas-phase. Vacuum
extraction of vapors from contaminated soils and subsurface strata has been successfully
employed to remove volatile compounds from permeable soils. Typically, sites considered for
vapor extraction-based technologies are those where chlorinated solvents or petroleum
products, such as gasoline and other fuels, have spilled or leaked into the subsurface. Vapor
extraction is not commonly used at mining and mineral processing sites since metals that are
the typical target contaminant are not in a gas-phase in soil.  The cost of vapor extraction is in
the range of medium to high and the effectiveness at most sites is poor unless a significant
quantity of chemicals are present within the soils in the vapor phase.

Solvent Extraction.  Solvent/chemical extraction is an ex-situ separation and concentration
process in which a nonaqueous liquid reagent is used to remove organic and/or inorganic
contaminants from wastes, soils, sediments, sludges, or water. The process is based on well-
documented chemical equilibrium separation techniques utilized in many industries, including
the mining and mineral processing industry.  In the mine-site remediation, one type of
solvent/chemical extraction technology (i.e., leaching) is used extensively, primarily because of
the application of accepted mining and beneficiation technologies to the remediation field.  The
cost  of solvent extraction is in the range of low to high depending on site characteristics, which
include: the media necessary to extract the contaminants, the system to recover the solution
with  the contaminants, the process to remove the contaminants from the solution, and the
handling and disposal of the spent waste or soil. The effectiveness of solvent extraction is
good if the contaminants can be extracted by the liquid reagent.

Soil  Washing.  The ex-situ process of soil washing employs chemical and physical  extraction
and separation techniques to remove a broad range of organic, inorganic, and  radioactive
contaminants from soils. The process begins with excavation of the contaminated soil,
mechanical screening to remove various oversize materials, separation to generate coarse- and

-------
                                       Chapter 10: Remediation and Cleanup Options  10-5
fine-grained fractions, and treatment of those fractions.  Surficial contaminants are removed
through abrasive scouring and scrubbing action using a washwater that may be augmented by
surfactants or other agents. The soil is then separated from the spent washing fluid, which
carries with it some of the contaminants. The recovered soils consist of a coarse fraction, sands
and gravels, a fine fraction, silts and clays, and an organic humic fraction, any or all  of which
may be contaminated. The washed  soil fraction may be suitable for redepositing on site or other
beneficial uses. The fines typically carry the bulk of the chemical contaminants and  generally
require further treatment using another remediation process, such as thermal destruction,
thermal desorption, or bioremediation.  The costs of soil washing would range from medium to
high similar to "soil flushing" discussed  below, however the costs are impacted by the controlled
method of recovering the liquid and  the excavation costs to remove the soil. The effectiveness
of soil washing is determined by the ability of the washing liquid to remove the contaminants.

Soil Flushing. The in-situ process  of soil flushing uses water, enhanced water, or gaseous
mixtures to accelerate the mobilization of contaminants from a contaminated soil for recovery
and treatment. The process accelerates one or more of the same geochemical dissolution
reactions (e.g., adsorption/ desorption,  acid/base reactions, and biodegradation) that alter
contaminant concentrations in ground-water systems. In addition, soil flushing accelerates a
number of subsurface contaminant transport mechanisms, including advection and molecular
diffusion, that are found in conventional ground water pumping. The fluids used for soil flushing
can be applied or drawn from ground water and can be introduced to the soil through surface
flooding or sprinklers, subsurface leach fields, and other means. When the contaminants have
been flushed, the contaminated fluids may be removed by either natural seepage or aground
water recovery system. Depending  upon the contaminants and the fluids used, the soil may be
left in place after the soil flushing is  completed. The cost of soil flushing ranges from medium to
high depending on the means of applying the flushing fluid and the method of recovery of the
fluids used.  The effectiveness of soil flushing is dependent on the characteristics of the soil and
the fluid used for flushing.  If the fluid can mobilize the required contaminants and be recovered,
the technology can be effective.  There often is a problem, however, with either mobilizing the
contaminants or recovering the fluid that limits the effectiveness. In contrast, another concern
is that contaminants may be highly mobilized with the subsequent possibility of contaminating
ground water.

Decontamination  of Buildings.  Decontamination of buildings and other structures through
various extraction and treatment techniques may be necessary at certain mining and mineral
processing sites. The purpose of decontaminating the structures may be to meet the
requirements of historical preservation and/or to assist the community in attracting new
industry. Decontamination  may be as simple as pressure washing a building or more complex,
involving partial removal techniques. As an illustration, if the contamination is a dust settled
throughout the building, a simple washing may remove the contamination; if, however, the
contaminant saturated wooden members of the structure, some of all the wood may have to be
removed in order to decontaminate  the building. The cost of decontaminating buildings and
other structures is dependent on the techniques needed to complete the decontamination
efforts.  The effectiveness of decontamination of buildings is site specific and will be determined
by what the contaminants are being addressed and how effective the technique is in removing
them.

10.3.2 Collection, Diversion, and Containment Technologies

Collection, diversion, and containment technologies are used at sites where treatment
technologies cannot control the contaminants to an acceptable level.  These engineering
controls include technologies that contain or capture the contaminants to reduce or minimize
releases.  This section discusses some of the containment technologies available to site
managers.

-------
10-6   Chapter 10: Remediation and Cleanup Options
Landfill Disposal. Landfills are waste management units, typically dug into the earth, but
including above ground units that are not exposed on the sides (i.e., not freestanding waste
piles), that accept waste for permanent placement and disposal.  While landfilling is a
conventional disposal technology, it has had its share of recent innovations. Landfills may be
lined to contain leachate, drained with a leachate collection system, and capped. The cost of
landfills can range from medium to high at mining and mineral processing sites depending on
the site conditions that impact the design, induding low permeability cover, low permeability
liner, leachate collection, and leachate treatment. The O&M costs of leachate treatment or cap
maintenance can  be significant. The effectiveness of the landfill  is dependent on the design.  A
landfill that can isolate the waste is effective. Should  the cap or liner be breached, however, the
effectiveness will be greatly diminished. On-site  landfills should be designed to meet site
specific cleanup goals and address applicable regulatory considerations.

Cutoff Walls.  Cutoff walls are structures used to prevent the flow of ground water from either
leaving an area, in the case of contaminated ground water, or entering a contaminated area, in
the case  of clean ground water. Types of cutoff walls  include: slurry walls, cement walls, and
sheet piling.

      Slurry walls are basically trenches refilled with a material (e.g., bentonite slurry) that
      combines low permeability and high adsorption characteristics to impede the passage of
      ground water and associated contaminants. The cost of slurry walls is in the medium
      range, with depth being a factor on the cost due to equipment limitations.  The
      effectiveness of slurry walls is dependent on the ability of the wall to get a seal on the
      bottom (i.e., by contact with an impermeable soil or rock layer) to keep the ground water
      from flowing under the slurry wall. Similarly, effectiveness is affected by construction of
      the slurry wall with no gaps or other points for by-pass.

      Cement walls are similar to the slurry walls, except that instead of a low permeability
      clay-type slurry, a cement-based slurry is  used. Construction  may be by trench and fill
      as with the slurry wall construction.  Alternately, construction may utilize a larger
      excavation in which forms are constructed to pour a concrete  wall after which the
      excavated area around the wall is backfilled.  The backfill may be with a high
      permeability material used to capture and channel the ground water flow (e.g., for
      recovery if contaminated, or to prevent its contamination). The cost of the cement walls
      is greater than the slurry walls  especially if the wall is formed in place, with a cost range
      of medium to high.  This increased cost however may buy an  increase in effectiveness.

      Sheet piling is a technology that is often  used to  install a cutoff wall.  Sheet piling has
      been used in the past to funnel ground water to a treatment cell for treatment and is
      regularly used as a temporary  cutoff wall during the remediation  period. The cost of the
      sheet piling is in the medium to high range, with the high range utilizing a better
      mechanism to seal the joints between the sheets. The effectiveness of sheet piling is
      similar to the slurry wall, however there is a greater potential of the wall to have leaks at
      the joints.

Pumping Groundwater.  A pump-and-treat process for addressing groundwater contamination
is a combination of an extraction technology (pumping) and a subsequent treatment
technology; this discussion focuses  on the pumping portion of the combination.  The treatment,
which can vary by contaminant, could beany of the other technologies discussed above. The
pump-and-treat technology has been the preferred method of remediating contaminated ground
water. The cost of the pumping portion  can range from medium to high, including, but not
limited to, the number and  spacing of wells, the volume to be pumped, and the depth to ground
water. The long-term effectiveness of this procedure is limited for certain contaminants,

-------
                                       Chapter 10: Remediation and Cleanup Options  10-7
especially some metals, in certain soil types. Consideration must be given to such factors as
desorption rates and chemical properties of the contaminants themselves.

Capping. Capping is typically used to cover a contaminated area or waste unit to prevent
precipitation from infiltrating an area, to prevent contaminated material from leaving the area
and to prevent human or animal contact with the contaminated materials. An example of
preventing releases is the growing of vegetation on tailings to prevent fugitive dust from blowing
off and being transported downwind. A example of preventing human contact is the removal
and replacement of a specified depth of soil in a residential area which has been used to
protect the residents from the contaminated subsoils.

Capping could include: surface armoring, soil/clay cover, soil enhancement to encourage
growth, geosynthetic or asphaltic cover system, polymetric/chemical surface sealers,
revegetation, concrete and  synthetic covers. The cost of caps can range from low (e.g.,
planting grasses) to high (e.g., synthetic caps) depending on the cap selected. The cap mayor
may not be effective in achieving multiple performance objectives, for example; a cap designed
to minimize erosion, however,  may not bean effective cap to minimize infiltration and vice
versa.

Detention/Sedimentation.  Detention/sedimentation controls are used to control erosion and
sediment laden runoff. "Treatment" generally consists of simply slowing the water flow and
reducing the associated turbulence to allow solids to settle out. Settling  may be allowed at
natural rates; in other cases flocculants may be added to increase the settling rate.  The settled
sediments may be removed and disposed; if the sediment is contaminated then treatment may
be required. The cost of detention and sedimentation is generally in the range of low to
medium, depending on the O&M costs to remove the settled solids.  The
detention/sedimentation basins can be effective if they can be designed to allow the proper
amount of settling time; however,  in some cases the solids settle at a very slow rate and a
portion of the solids leave the settling basin.

Settling Basins. Settling basins  may be used to contain surface waters so that contaminated
sediments suspended in the water column  can be treated, settled, and managed appropriately.
Dissolved contaminants and/or acid waters may be contained as well to  allow for treatment or
natural degradation (e.g., contained cyanide will degrade naturally). As the impoundment fills
with the solids that have settled out, solids  must be removed and disposed of in order for the
impoundment to continue working effectively. The cost of operating settling basins is in the low
to medium range, depending on the construction  of the impoundment and dam. For example, a
lined impoundment will cost more than an unlined impoundment. The O&M costs of the settling
basin could be significant over the life of the basin to remove and dispose of any settled solids.
Properly designed settling basins  can be effective in removing suspended solids from surface
waters.

Interceptor Trenches. Interceptor trenches are trenches that have been filled with a
permeable material, such as gravel, that will collect the ground water flow and redirect it for
either in-situ or ex-situ treatment.  Interceptor trenches are often used to collect and treat
ground water and prevent it from leaving a containment area, such as a landfill. The initial cost
of interceptor trenches is low to moderate depending on the availability of materials. However,
the O&M cost can be significant if the liquid flowing through the trench precipitates material that
will plug the trench, thus minimizing the permeability and requiring the permeable material to be
cleaned or replaced.  Interceptor trenches  are effective at capturing ground water flow if the
permeability of the media in the trench is greater than the native material.

-------
10-8   Chapter 10: Remediation and Cleanup Options
Erosion Controls. Erosion controls are those engineering controls used to eliminate or
minimize the erosion of contaminated soils by either air or precipitation (i.e., stormwater or
snow melt).  Erosion controls include:

       Capping or covers (as discussed above), particularly in the form of revegetation,
       polymer/chemical surface sealers, armoring and soil enhancements.  The caps or
       covers for erosion control, in general, are lower than the costs of caps to limit infiltration.
       The cost range of the erosion control caps is low to medium. The O&M costs of the cap
       could be significant, particularly if the cap or cover can be easily damaged. For
       example, if revegetation is selected, then the O&M costs will include revegetating areas
       where the vegetation does not grow, or is damaged by factors which could include
       natural conditions such as drought or insect invasion. The effectiveness of the caps or
       covers to prevent erosion is dependent on site conditions, however the caps or covers
       should generally prevent the erosion of soils by either water or air.

       Wind breaks are used to  minimize the erosion of soils and dusts by the wind and can
       include planting of trees and other vegetation to reduce the wind  velocity, and/or the
       installation offences. The cost of wind breaks is generally in the low to medium range.
       The effectiveness of wind  breaks is dependent on the prevailing wind. In general, wind
       breaks are not as effective at eliminating airborne dust as the caps or covers.

       Diversions (as discussed below) are used to control surface water around areas that
       have a high probability of erosion. An example of this would be construction of a
       diversion ditch to capture runoff which prevents the flow from reaching a steep slope,
       where it could cause erosion.

Diversions. Diversions are engineering controls that are used to divert ground water or
surface water from infiltrating waste units or areas of contamination, thereby preventing the
media from being contaminated and pollutants from leaching and migrating.  Two types of
diversions are run-on controls and capping:

       Run-on controls prevent surface water from entering waste units or areas of
       contamination and becoming contaminated.  For example, surface waters may be
       diverted to avoid contact with stockpiled waste rock.  This would prevent the water from
       becoming acidified. Examples of run-on controls would include retaining walls, gabion
       dams, check dams (both permanent and temporary), and diversion ditches. The costs
       of run-on controls are low to medium depending on the method used for the diversion.
       The use of run-on controls to divert surface water away from areas of contamination is
       effective in reducing the quantity of water that requires treatment.

       Capping is the placement of synthetic liners or impervious earthen materials (typically
       clay) to prevent precipitation from infiltrating waste materials or severely contaminated
       areas and leaching contaminants into the ground water. This allows water to be
       captured and diverted elsewhere.  The cost and effectiveness of caps are discussed
       above.

Stream Channel Erosion Controls are used to minimize the mobilization and transport of
contaminated sediments by streams within the site. At many mining and mineral processing
sites, historic transport of contaminated sediment into the stream has occurred.  Many sites
have areas where these sediments have been deposited along stream shores and beds.
Stream channel erosion controls can be used to minimize the remobilization  and transport of
these sediments, often during periods of high flows. Technologies to control stream channel
erosion often include both erosion controls and diversions such as channelization or lining of
stream channels, diversion dams and channels (construction of diversion dams and or channels

-------
                                       Chapter 10:  Remediation and Cleanup Options  10-9
to reduce flow to contaminated areas and ground water recharge areas, to reduce water
velocity, trap sediment and divert clean water), riprap, and gabions. The cost of these controls
can range from  low (e.g., revegetation of stream banks) to high (e.g., diversion to an
engineered channel) depending on the site conditions. Some of the technologies may be
temporary until other remediations are completed. The O&M cost to the erosion controls could
be significant, especially with damage from flood events.

10.3.3 Reuse, recycle, reclaim

Sale of Useable Materials. Sale of materials that can be utilized by other is another
management approach that the site manager may employ. The useable materials could
include: finished product in the unlikely case that any remains on site; supplies of materials that
remained unused at the site; feedstocks, ore or concentrate that remains on site; demolition
debris for reprocessing; and/or waste materials for reprocessing. The cost from this technology
may be either low or positive.  In evaluating the cost of selling useable materials, the cost
should be compared to the cost of disposal to ensure that the cost of selling the material minus
any money received is actually less than the cost of disposal. Recycling or  reusing these
materials is an effective means of eliminating contaminants, although there  generally are limited
materials that should be sold.

Remining/Reprocessing.  Remining is the process of taking mine "waste" material and
running it through a process to recover valuable constituents. Remining typically utilizes the
same mining and beneficiation processes discussed in Chapter 3 to extract metal contaminants
from tailings or other waste materials.  For example, tailings may be reprocessed to recover
metals that remain, by any or all of the following methods: gravity separation (if there  is  a
difference in the specific gravity of the desired mineral and the rest of the tailings), flotation, or
leaching.

The cost of remining/reprocessing may range from profitable to high depending on the cost of
the remining/reprocessing minus the value paid for the metals or other materials. The "new
tailings" can be  placed in an engineered containment facility which generally is more desirable
than the existing facility, thereby minimizing the potential of releases to the environment. The
"clean tailings" may also have other beneficial uses, depending on the characteristics of the
tailings. The effectiveness of the remining and  reprocessing can vary significantly depending
on the site. In general, however, it is very effective for the portion of the waste that is
reprocessed.
10.4   Innovative/Emerging Technologies

The following treatment technologies are considered to be innovative/emerging technologies.
The discussion is intended to provide examples; innovative and emerging technologies are
continually evolving and information addressing these technologies will necessarily be obtained
from individuals and organizations with ongoing characterization and remediation activities,
investigations, or research.

Bioremediation, for the purpose of this discussion, refers to the use of microbiota to degrade
hazardous organic and inorganic materials to innocuous materials.  Certain bacteria and fungi
are able to utilize, as sources of carbon and energy, some natural organic compounds (e.g.,
petroleum hydrocarbons, phenols, cresols, acetone, cellulosic wastes) converting these and
other naturally occurring compounds to byproducts (e.g., carbon dioxide, methane, water,
microbial biomass) that are usually less complex than the parent material.  At metal
contaminated sites, such as mining and mineral processing sites, the addition of biological
nutrients has been demonstrated to stimulate natural microorganisms to operate a natural

-------
10-10  Chapter 10:  Remediation and Cleanup Options
process for biological attenuation and stabilization of heavy metals. The cost of bioremediation
is in the range of medium to high; as the technology evolves the cost may decrease.

Phytoremediation is the use of plants and trees to extract, stabilize or detoxify contaminants in
soil and water. The phytoremediation process generally describes several ways in which plants
are used to remediate or stabilize contaminants at a site.  Plants can break down organic
pollutants or stabilize metal contaminants  by acting as filters or traps. The three ways that
phytoremediation works are: phytoextraction, rhizofiltration, and phytodegradation.

       Phytoextraction, also termed phytoaccumulation, refers to the uptake of metal
       contaminants by plant roots into stems and leaves.  Plants that absorb large amounts of
       metals are selected and planted at a site based on the type of metals present and other
       site conditions that will impact the growth. The plants are harvested and either
       incinerated or composted to recycle the metals. The cost of phytoextraction is in the low
       to medium range depending on site conditions and the costs of disposal of the
       harvested plant material. The O&M costs may be significant if the plants need to be
       harvested for many years.  The effectiveness of phytoextraction has been good for
       some metals where there are shallow, low levels of contamination; the technology is,
       however, considered innovative for most metals.

       Rhizofiltration is used  to remove metal contamination in water. The roots of certain
       plants take up the contaminated water along with the contaminants.  After the roots
       have become saturated with metals, they are harvested and disposed. The  cost of
       rhizofiltration is in the low to medium range depending on site conditions and the cost of
       disposal of the harvested plant material.  The O&M costs  may be significant  if the plants
       need to be harvested for many years. The effectiveness of rhizofiltration is not yet
       determined as the technology is considered innovative.

       Phytodegradation is a process in which plants are able to degrade organic  pollutants.
       Phytodegradation is not currently used for inorganic contaminants.

Vitrification. Vitrification is a solidification process employing heat to melt and convert waste
materials into glass or other crystalline products. Waste materials, such as heavy metals and
radionuclides, are actually incorporated  into the relatively strong, durable glass structure that is
somewhat resistant to leaching. The high temperature also destroys any organic constituents
with byproducts treated in an off-gas treatment system that generally must accompany
vitrification.  The cost of vitrification is very high and  has not been commonly used at mining
and mineral processing sites.  The effectiveness of the vitrification is dependent on the material
that is treated. If a glass like product can  be made, the ability to isolate the waste is very
effective.
10.5 Institutional Controls

Institutional controls are non-engineered solutions (e.g., fencing and signing, zoning
restrictions) that are used to protect human health and the environment by controlling actions or
modifying behavior. Institutional Controls are part of risk management and a potential part of
the response.  Risk should be evaluated for present site conditions and the various altrnative
future uses. It is in this latter element that the risk levels of specific future land uses and
institutional controls can be evaluated.  Where residential exposures do not currently exist and
may not occur in the foreseeable future, institutional controls may be adequate to protect
against human health exposures (though active remediation still may be required for
environmental risks).  In general, Institutional Controls can include, but not limited, a number
of activities as described below. The user is advised to consult the Institutional Controls: A

-------
                                      Chapter 10:  Remediation and Cleanup Options   10-11
Reference Manual, US EPA Workgroup on Institutional Controls - Workgroup Draft 1998 and/or
Institutional Controls: ASite Manager's Guide to Identifying, Evaluating and Selecting
Institutional Controls atSuperfund and RCRA Corrective Action Cleanups, Draft March 2000,
OSWER 9355.0-74FS-P, EPA 540-F-OO for further details on institutional controls.

Restricting Access is often used to minimize access to areas where there may be an
exposure. Erecting fenced, posting signs, utilizing guards or security services, and using fines
for unauthorized access all may assist in restricting access. The cost of fencing can be
significant if the area is quite large and O&M  costs can also be significant if the fences need
constant maintenance to repair damage, either from natural causes or breaches. Fences can
be effective at restricting access; they may, however, in some circumstances encourage the
curious to trespass.  The cost of posting signs is low and maintenance costs are generally low.
Effectiveness of the signs,  however, is generally poor.  While fining trespassers may be utilized,
the cost of enforcement may be significant if additional guards have to be employed.  The
levying of fines generally has a limited effectiveness.

Deed Restrictions/Notices place legal restrictions on the use of and transfer or sale of the
property and provide the prospective purchaserwith a notification of any requirements that
must be met on the property. The cost of implementing the deed restrictions/notices is low.
The effectiveness of any of these deed restrictions/notices depends on the support of the local
government and/or the entity (i.e., easement  holder) authorized to enforce controls.  In addition,
the motivation to enforce these regulations may diminish as time passes after completion of the
cleanup.

Zoning or Other Regulations restrict activities that could cause an exposure. The local
government must enact and enforce the regulations.  The cost of implementing the regulation is
low,  however the costs of enforcing the regulations can be very expensive, especially to a local
government that may be depressed (i.e., because of  a reduced tax base from loss of the mining
enterprise being addressed). The effectiveness  of any of these  regulations or zoning
requirements depends on the local government and community. The motivation to enforce
these regulations may diminish as time passes after the completion of the cleanup. Examples
of regulations include: restricting use  of off-road vehicles in an area where the use could
damage the remediation and allow contaminants to be released  by erosion (e.g., air or surface
water); speed limits for unpaved roads to limit the amount of dust that would be generated; or
load  limits on roads to keep the surface from  breaking down. An example of a zoning
regulation would  include a regulation that would keep areas of the mining and mineral
processing site industrial or commercial.

Limited Future Development in a remediated area would require that future development not
damage the remedy or increase the exposure. The cost of implementing this is low; as with the
cost  of zoning, however, it requires the community and local government to accept the
limitations. The effectiveness of this  control is dependant on the local government willingness
to mandate and enforce limitations.

Regulatory Requirements are those requirements that are needed to keep the remedy in
place.  They can be very important at a mining and mineral processing site that includes a
residential community. Examples of regulatory requirements include drilling permits, excavation
permits, or construction permits in areas where there is contamination at depth. The permits
would ensure that all activities  where contaminated soils are exposed would follow certain
procedures to minimize any exposure or re-contamination of clean soils. The costs of
implementing and managing these procedures would range from medium to high depending on
how  the permits are issued and tracked. The effectiveness of this system depends on the
source of funding for the permit process and  the willingness of the community and local
government to accept the requirements.

-------
10-12   Chapter 10: Remediation and Cleanup Options
Procedures for Soil Disposal are a set of procedures to handle and dispose of any
contaminated soils that are removed during normal activities, such as repairs to infrastructure
(e.g., roads and utilities) and development and expansion of existing houses and buildings.
The cost of these procedures will vary depending on requirements for handling and disposal.  In
general, the costs would be anticipated to be in the medium to high range. The effectiveness of
these procedures is  dependent on the acceptance of the community. If the procedures are
considered to be onerous or difficult, they probably will not be effective.

Health Education Programs are used to inform and educate the community of the risks from
the contaminated media. This can be a difficult task in an established community that does not
perceive a risk. The costs of the health education program can range from low to high
depending on what is included in the program.  For example, if health intervention and
monitoring are included as part of the program the costs will be high. The effectiveness of the
health education program  is dependent on community acceptance.

Interior Cleaning is a more effective way to remove contaminated dusts and soils from a
house.  However, the cost of the cleaning every home can range from medium to high. If the
sources of the dusts and soils have not been removed, the home can become recontaminated
in a short time.  Programs to encourage interior cleaning can assist in reducing the risk from
contaminated dusts and soils that have entered the home, either via airborne dust or tracked in
by people or animals.  An example of such a program was employed at the Bunker Hill
Superfund site in northern Idaho in which the program loaned vacuums with HEPAfilters to
local residents. The costs of the programs are generally low, however the effectiveness varies
based on community acceptance.
10.6   Sources of Information and Means of Accessing Information Regarding Available
       Technologies

Identifying innovative technologies or cross-applying technologies from conventional sites to
mining and mineral processing sites can be difficult as the technologies and their applications
are constantly changing and improving.  It is extremely important that the site manager know
how to access information regarding these technologies.  One goal of this handbook is to
provide the site  manager with a roadmap to this information; the second goal  is to encourage
the site manager to build a network of contacts. A network of individuals and  organizations that
can answer questions and provide information regarding technologies is critical in the
development of remediation alternatives. This network may include government, academic,
and private sector entities.  Former and current mine-site remediation managers are an
extremely valuable source of practical information regarding problems encountered at mining
and mineral processing sites and solutions, including both successful and  unsuccessful
methods.  Program and enforcement staff at EPA Headquarters and the ten EPA Regional
Offices, as  well  as State offices can assist site managers with understanding and addressing a
variety of issues related to Superfund, Applicable or Relevant and Appropriate Requirements
(ARARS), other standards, limitations, criteria, and other programs and initiatives. Other
Federal agencies, including the Department of Energy, the  Department of Defense, the
Department of Agriculture, and the Department of Interior, are active in developing remediation
technologies and assisting mining operations. Universities and university-led centers (e.g.,
combinations of government, academic, and private sector entities) are actively exploring new
opportunities in  remediation technologies.  Finally,  private sector entities are developing
technologies, although the nature of their business may limit easy access to innovative
technologies outside of a business relationship.

-------
                                      Chapter 10: Remediation and Cleanup Options   10-13
Building these contacts into a network will assist the site manager in addressing all aspects of
the site investigation and cleanup. To help begin this process, Appendix I of this reference
document includes a list of contacts for EPA staff working with mining and mineral processing
related issues.

In addition, the Internet websites identified in Appendix J allows the user to electronically
access a vast amount of data regarding remediation technologies and related topics.  Other
sources of information have been analyzed and collected in the appendices as well.  These
appendices are intended to provide the user with  a guide to the many sources of information
regarding remediation technologies that are currently available. Some of the sources of
information available include: hotlines, libraries, universities and research centers, the Internet,
computerized bulletin boards, and technical documentation.

EPA has developed a large number of areas with information of potential use in identifying
remediation technologies.  These include Web pages, a compendium of Superfund guidance
and technical documents, rule-making dockets, and various media- and program-based offices
(e.g., the Office of Water and the Superfund Office).

-------
10-14   Chapter 10:  Remediation and Cleanup Options
Exhibit 10-1
Remediation Technologies Matrix
Technology
Bioremediation
Capping
Capping (Erosion)
Cement Walls
Chemical
Treatment
Decontamination
Deed Restrictions
Detention/
Sedimentation
Fencing
Fines
Health Education
Programs
Interceptor
Trenches
Interior Cleaning
Landfill Disposal
Type
I/E
C
C
C
C
C
1C
C
1C
1C
1C
C
1C
C
Media
S
S, sludges,
wastes
S, SW, A
GW
SW, GW
Structures
Land
SW

S,SW,
GW, A
S,A,GW,S
W
GW
S, A
S, Solid
Waste
Cost2
M-H
L-H
L-M
M-H
M-H
L-M
L
L-M
L-M
L
M-H
L-H
M-H
M-H
Effectiveness
Innovative technology.
Effective
Depends on site conditions,
generally effective
Effective
Effective
Depends on site conditions
and contaminants
Depends on community
acceptance
Effective
Fencing can be effective at
restricting access if the
fences are maintained.
Depends on community
acceptance
The effectiveness of any
health education program
depends on the community
acceptance.
Effective in capturing GW if
the permeability is greater
than native material
Can be very effective for
removing the exposure to
contaminants in interior
dust.
Effective as long as the cap
or liner are not breached.
Comments


O&M costs could be
significant if the cap or
cover is damaged.

O&M cost may be
significant.



O&M costs can be
significant, particularly for
long stretches offence.

Needs local enforcement
and support to be effective.
Significant O&M costs if the
GW materials precipitate
and reduce the
permeability, requiring the
media to be replaced or
cleaned.
Re-contamination is
possible if sources have not
been remediated.
May have significant O&M
costs to maintain cap or
treat leachate.
Type:   C = Conventional; I/E = Innovative/Emerging; 1C = Institutional Control
Media:  S = Soil; GW = Ground Water, SW = Surface Water; A= Air
Cost:   L = Low; M = Medium; H = High; VH = Very High

-------
                                                 Chapter 10:  Remediation and Cleanup Options   10-15
Exhibit 10-1
Remediation Technologies Matrix
Technology
Limited Future
Development
Phytoextraction,
Phytodegredation
Programs to
Encourage
Interior Cleaning
Pump and Treat
Regulatory
Requirements
Remining/
Reprocessing
Rhizofiltration
Run-on Controls
Sale of Useable
Materials
Settling Basins
Sheet Piling
Signs
Slurry Walls
Soil Disposal
Type
1C
I/E
1C
C
1C
I/E
C
C
C
C
C
1C
C
1C
Media
Land
S
S, A
GW
S
S, Wastes
SW, GW
SW
feedstocks,
wastes
SW
GW
S,SW,
Waste
Units
GW
S
Cost2
L
L-M
L
M-H

L-H
L-M
L-M
L
L-H
M-H
L
M
M-H
Effectiveness
Depends on community
acceptance
Has been successful for
some metals
The effectiveness depends
on community acceptance.
Depends on site conditions
and contaminant
characteristics
The effectiveness depends
on community acceptance.
If all the material can be
removed, this is a very
effective tech nology; only a
limited amount of material
may, however, be available
for remining.
Innovative technology
Effective
Good
Effective in removing
suspended solids
Effective
Signs have a very limited
effectiveness
Effective
The effectiveness depends
on community acceptance.
Comments

May be considered
innovative.
Some community members
will not participate.

Needs a source of funding
to implement the permit
issuing and tracking
system.
Depends on the
characteristics of the
material to be reworked.
Recovering salable metal
may offset remediation
costs. The time to
reprocess large amounts of
material could be significant
and may not be acceptable.


Limited to those materials
that there is a market for.
May have significant O&M
costs over the life of the
dam.
May have "leaks" in the wall
O&M costs can be
significant if the signs keep
"disappearing"
May have "leaks" in the
wall.
Greatly depends on the
handing and disposal
requirements
Type:   C = Conventional; I/E = Innovative/Emerging; 1C = Institutional Control
Media:   S = Soil; GW = Ground Water, SW = Surface Water; A= Air
Cost:   L = Low; M = Medium; H = High; VH = Very High

-------
10-16   Chapter 10:  Remediation and Cleanup Options
Exhibit 10-1
Remediation Technologies Matrix
Technology
Soil Flushing
Soil Washing
Solidification
Solvent Extraction
Speed Limits
Stabilization
Stream Channel
Erosion Control
Thermal
Destruction
Thermal
Desorption
Vapor Extraction
Vehicle Limits
Vitrification
Wind Breaks
Zoning
Type
C
C
C
C
1C
C
C
C
C
C
1C
I/E
C
1C
Media
S
s
S, sludges,
wastes
S, wastes,
sludges
A, S
S, sludges,
wastes
SW
S, sludges,
wastes
S
S
S
S, Solid
Waste
S
S
Cost2
M-H
M-H
M-H
L-H
L
M-H
L-H
M-H
M-H
M-H
L
VH
L-M
L-M
Effectiveness
Site conditions affect fluid's
ability to mobilize
contaminants
Site conditions affect fluid's
ability to mobi lize
contaminants
Depends on the ability of
the solid to break down over
time.
Depends on the solutions'
ability to extract
contaminants
The effectiveness depends
on community acceptance.
Dependent on the nature of
material to be stabilized.
Effective
Poor for metals
Depends on site
characteristics and
contaminants
Depends on site
characteristics and vapor
phase contaminants
The effectiveness depends
on community acceptance.
Effective
Fair to good effectiveness
The effectiveness depends
on community acceptance.
Comments
May be a concern with
contamination of ground
water.



Needs local enforcement
and support to be effective.

O&M costs can be
significant.
Not common at most mining
and mineral processing
sites.
Not common at most mining
and mineral processing
sites.
Not common at most mining
and mineral processing
sites.
Needs local enforcement
and support to be effective.
Not common at mining and
mineral processing sites.

Needs local enforcement
and support to be effective.
Type:   C = Conventional; I/E = Innovative/Emerging; 1C = Institutional Control
Media:  S = Soil; GW = Ground Water; SW = Surface Water; A = Air
Cost:   L = Low; M = Medium; H = High; VH = Very High

-------
                                   Chapter 11
                          The  Regulatory "Toolbox"
11.1 Introduction

This chapter discusses the primary tools available to EPA project managers in developing
strategies for investigation and cleanup of an abandoned mine site.  These same tools may
also be available to other federal agency and state personnel. In addition, there are a variety of
other tools available to state and federal resource managers and regulators that are not
discussed in this text. The site manager is encouraged to refer to additional agency or state
resources to choose the best tools for a given site.

Regulation of mining activities occurs via a complex web of sometimes overlapping jurisdictions,
laws, and regulations covering several environmental media.  Land ownership and tenancy
issues further complicate regulatory issues. Each abandoned mine site faces a somewhat
unique set of regulatory requirements,  depending on State statutes or regulations; whether it is
on Federal, State, Tribal or private land; local regulations;  and the specific environmental
considerations  unique to the site.  Although this chapter focuses  on the various tools provided
by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)
and its remediation process, especially as it relates to the  unique characteristics of mine site
remediation, the use of other tools should  be considered where appropriate.  An overview of
some of the other tools available to the site manager are included in the later sections of this
chapter.
11.2 Background

Historically, CERCLA has been used as a tool to implement cleanup activities at a large number
of mining and mineral processing sites across the country. CERCLA authorities have been
used for cleanups ranging from the removal of drums of hazardous substances from long-
abandoned sites, to major privately funded  cleanup actions at sites on the National Priorities
List.

The joint and several  liability provisions of CERCLA are powerful tools in compelling private
parties to conduct cleanup actions at many sites.  The availability of federal money to conduct
work when efforts to induce privately funded deanups fail allows EPA an independent ability to
respond to public health and environmental threats.  The cost recovery provisions of CERCLA
make it possible for the government to be reimbursed for the cleanup costs it incurs.

CERCLA is a very flexible tool for addressing the environmental risks posed by mining and
mineral processing sites. Other chapters of this document discuss technical aspects of
conducting deanup work at mining and mineral processing sites. Equally important, however,
are the policy and administrative decisions regarding how CERCLA or other authorities can  best
be utilized to implement site cleanup.  If CERCLA is selected as an administrative tool to
implement site characterization and cleanup,  it is critical to develop an overall strategy to
determine how CERCLA can best be utilized for cleanup of a mining or mineral processing site,
or a watershed affected by mining or mineral  processing. Other programs at EPA appropriate
state agencies, tribes, local government,  and  other federal agencies also need to be involved in
determining how best to develop an integrated site management strategy.

-------
11-2   Chapter 11: The Regulatory "Toolbox"
11.3 CERCLA Jurisdiction/Applicability

11.3.1  Jurisdictional Conditions

CERCLA applies anytime there is a release or threatened release of: 1) a hazardous
substance into the environment or 2) a pollutant or contaminant "which may present an
imminent and substantial endangerment to the public health or welfare." The term "release" is
defined broadly in the statute, induding any type of discharging or leaking of substances into
the environment. This also includes the abandonment of closed containers of hazardous
substances and pollutants or contaminants.

The definition of hazardous substance is extremely broad, covering any "substances,"
"hazardous constituents," "hazardous wastes," "toxic pollutants," "imminently hazardous
chemicals or mixtures," "hazardous air pollutants," etc., identified under other federal
environmental laws, as well as any substance listed under Section 102 of CERCLA. The fact
that a substance may be specifically excluded from coverage under one statute does not affect
CERCLA's jurisdiction if that substance is listed under another statute or under Section 102 of
CERCLA. A comprehensive list of these substances is provided in 40 CFR 302.4.  From a
mining  perspective, certain sulfates are not listed, and thus may be excluded from the broad
coverage of "hazardous substances." Contaminants such as sulfates, however, can be
covered under the more limited provisions of CERCLA relating to "pollutants and
contaminants," as will be discussed below.  It should be noted  that although all mineral
extraction and beneficiation wastes,  and some mineral processing wastes are excluded from
RCRA  Subtitle C regulation by the Bevill Amendment, these wastes may be addressed under
CERCLA.

11.3.2  Media

CERCLA is not media-specific. Thus, it may address releases to air, surface water, ground
water, and soils.  This multi-media aspect of CERCLA makes it possible to conduct
environmental assessments and design cleanup projects that address site contaminants in a
comprehensive way.

11.3.3  Constituents

CERCLA covers almost every constituent found at mining and  mineral processing sites.
Exceptions include petroleum (that is not mixed with a hazardous substance) and responses to
releases of a naturally occurring substance in its unaltered form. It should be noted, however,
that the latter exception does not include any of the releases typically dealt with at mining sites,
such as acid mine drainage, waste rock, or any ore exposed to the elements by man.
11.4 Implementation Mechanisms

11.4.1 Permits

CERCLA does not include any formal permit mechanism.  CERCLA was essentially designed
as a tool to address problems in a "relatively short period of time.  It was not intended to be an
ongoing "regulatory or permit" authority; thus, an infrastructure was not set up for long-term
regulatory compliance (e.g., more than 30 years).

Section 121 (e) of CERCLA waives any requirement for a federal, state, or local permit for any
portion of a removal or remedial action that is to be conducted entirely on site.  Typically,
however, that action must be performed in accordance with the substantive environmental

-------
                                              Chapter 11: The Regulatory "Toolbox"  11-3
requirements of the regulatory authority for which the permit was required.  EPA usually has
taken the position that "on-site" includes a discharge to surface water within the site
boundaries, even though the water eventually flows off site. Some concern has been
expressed regarding the extent to which this waiver is valid after the CERCLA action is
completed. The Section 121 (e) exemption is essential for ensuring that EPA can carry out
remedial actions in a timely manner.

11.4.2 Review/Approval

Typically, no review or approval is afforded under Superfund at new or existing facilities unless
there is a release or threat of release addressable under CERCLA. However, once jurisdiction
is established, the Agency has the capacity to review and approve any plans that address or
affect that release (See the Administrative and Injunctive Authorities section below).

Section 108(b) of CERCLA does give the Administrator the authority to promulgate regulations
that would require adequate financial assurance from classes of facilities that is consistent with
the degree and duration of risk associated with the production, transportation, treatment,
storage, or disposal of hazardous substances.  The statute describes  ways in which the
financial responsibility can be established (insurance, guarantee, surety bond, letter of credit, or
qualification as a self-insurer), and authorizes EPA to specify policy or other contractual terms,
conditions, or defenses for establishing evidence of financial responsibility.  EPA has not, as
yet, used this authority.

11.4.3 Response Authorities

CERCLA's main strength is its response authorities. EPA can either use the Superfund (funded
primarily by an industry tax) to perform response (removal or remedial) activities (Section 104)
or require  private parties to perform such activities (Section 106).  CERCLA gives EPA the
flexibility to clean up sites based upon site-specific circumstances. EPA's cleanup decisions
are based upon both  risk assessment and consideration of "applicable or relevant and
appropriate requirements" (ARARs).  As long as thejurisdictional prerequisites have been met,
CERCLA gives EPA the ability to perform any activity necessary to protect public health and the
environment.

CERCLA provides EPA with the authority to perform "removal" actions, and "remedial" actions.
Assessments evaluate contaminants of concern, exposure pathways, and potential receptors.
The assessment process includes the review of all available information as well as sampling for
any other necessary information. The process is broad  in  its application  and is a powerful tool
in evaluating environmental risks posed  by a site.  Removal actions can be performed on
mining and mineral processing sites of any size in an emergency situation (e.g., implementation
can occur within hours) or over a long period of time. Removal actions are  subject to limits on
time (12 months) and money ($2,000,000) under the statute; however, these limits are subject
to broad exceptions.  For example, the Agency has implemented removal actbns costing in the
tens of millions of dollars at mining and  mineral processing sites.

Remedial actions are typically long-term responses performed at those sites placed on the
National Priorities List.  Remedial actions may be performed at non-NPL sites only if they are
privately financed.  Remedial actions are not subject to the time or dollar limitations imposed on
removal actions, but require a more detailed and formal decision process.  Unlike removal
actions, however, remedial actions to be implemented with Superfund dollars (when there are
no viable responsible parties) require a 10% state share in costs and a state assurance of
operation and maintenance before remediation can commence.

-------
11-4   Chapter 11: The Regulatory "Toolbox"
Land management agencies, such as the Forest Service and BLM have CERCLA response
authority, particularly when the site is not listed on the NPL.  The land management agencies
and other natural resource trustees, such as the National Marine Fisheries Service and the Fish
and Wildlife Service, also have Section 106 order authority, to be exercised with EPA
concurrence, when response is needed on federal land or is needed to prevent an adverse
impact on natural resources.

11.4.4 Standard Setting

Under the current statute, CERCLA has no uniform national standard-setting authorities. The
NCR,  at 40CFR300.430(e)(9)(iii)(A-H), lists nine criteria, through which EPA can set site-
specific standards for clean-up and maintenance to minimize risk and satisfy ARARs.

ARARs, discussed below in Section 11.4.5, can be a very useful tool, as they give the Agency
the authority to impose standards that would not otherwise be applicable,  if those standards are
determined to be relevant and appropriate under the circumstances. Of particular interest in
the mining context, EPA has the authority to use appropriate regulations adopted under RCRA
Subtitle C despite the fact that most mining wastes are excluded from regulation under RCRA
Subtitle C by the Bevill Amendment. Nonetheless, EPA can only require attainment of the
substantive aspects of relevant and appropriate standards, not the procedural requirements.

11.4.5 Applicable or Relevant and Appropriate Requirements

Under Section 121 (d) of CERCLA, remedial actions must comply with substantive provisions of
federal environmental laws and more stringent, timely identified state environmental orfadlity
siting  laws.  Removal actions must comply with ARARs also, but only to the extent practicable.
"Applicable" requirements are those federal or state laws or regulations that specifically address
a hazardous substance, pollutant, contaminant, remedial action, location,  or other circumstance
found at a CERCLA site. "Relevant and appropriate" requirements are not "applicable," but
address problem or situations similar enough to those at the CERCLA site that their use is well
suited to the site.  State requirements are not considered ARARs unless they are identified in a
timely manner and are more stringent than federal requirements.

ARARs are contaminant, location, or action specific. Contaminant specific requirements
address chemical or physical characteristics of compounds or substances on sites. These
values establish acceptable amounts or concentrations of chemicals which may be found in, or
discharged to, the ambient environment.

Location specific requirements are restrictions placed upon the  concentrations of hazardous
substances or the conduct of cleanup activities because they are in specific locations. Location
specific ARARs relate to the geographical or physical positions  of sites, rather than to the
nature of contaminants at sites.

Action specific requirements are usually technology based or activity based requirements or
limitations on  actions taken with respect to hazardous substances, pollutants or contaminants.
A given cleanup activity will trigger an action specific requirement. Such requirements do not
themselves determine the cleanup alternative, but define how chosen cleanup methods should
be performed.

EPA has published a manual outlining  all potential federal ARARs that may be requirements at
Superfund sites. Published in two parts, the manual is entitled CERCLA Compliance with Other
Laws Manual, Part I, August 1988, and Part II, August 1989, and is available at EPA libraries.
In addition, Appendix D discusses ARARs that are commonly utilized at mining and mineral
processing sites.

-------
                                               Chapter 11: The Regulatory "Toolbox"   11-5
11.5 Compliance/Enforcement

11.5.1  Administrative and Injunctive Authorities

CERCLA Section 106 provides for the issuance of administrative order or injunctive relief under
the following conditions: (1) there may be an imminent and substantial endangerment to the
public health or welfare or the environment; (2) because of a release or threat of a release; (3)
of a hazardous substance; (4) from a facility.  See CERCLA Section 106. (Note there are
conflicting opinions regarding authority under Section 106 for ordering cleanup of pollutants and
contaminants.)  EPA typically only issues orders to parties that are potentially liable under
CERCLA Section 107. The scope of liability under CERCLA is broad. Anyone fitting the
following categories is liable under CERCLA: 1) current owner (including lessees) or operator of
the facility; 2) past owner or operator at the time of the disposal of hazardous substances in
question; 3) anyone who arranged for the treatment, transportation, or disposal of the
hazardous substances in question; and 4) any transporter of the hazardous substances in
question if the transporter chose the disposal location. Liability is strict. That is, if the party falls
into one of the above four categories, it is liable, regardless of "fault."  Liability for the
government's response costs  is joint and several so long as the harm is "indivisible," i.e., there
is no rational basis for apportionment. The burden of proof as to whether harm is indivisible is
on the  defendant, not on the government.  Liability is retroactive, thus CERCLA can reach those
responsible for disposal activities prior to enactment of CERCLA.

Mining and mineral processing sites generally qualify as CERCLA facilities. A facility is defined
as "any building, structure, installation, equipment, pipe or pipeline...well, pit, pond, lagoon,
impoundment, ditch...or any site or area where a hazardous substance has been deposited,
stored, disposed of, or placed, or otherwise come to be located...." Consequently, nearly any
feature of a mine site fits within the definition of "facility."  EPA has the discretion to define
"facility" as broadly or narrowly as necessary to fit site-specific requirements. If the
jurisdictional requirements are met, EPA may either proceed directly with an administrative
order or request the U.S. Department of Justice to seek injunctive relief from a federal District
Court.  Historically, the vast majority of work performed under these provisions has been done
administratively. Judicial intervention is relatively rare.

EPA has broad authority under CERCLA to require response actions.  At existing facilities,  EPA
could enjoin production activities or order changes to those activities (unless the activity is a
discharge pursuant to a federally permitted release).  EPA can require the implementation of
institutional controls meant to reduce the endangerment posed by the presence of hazardous
substances or the removal of such substances to a more appropriate location (which must meet
ARARs and the off-site rule).  EPA has broad discretion to choose  response actions most
appropriate for particular sites  (See Response Authorities above), provided such actions are
not "inconsistent with" the National Oil and Hazardous Substances Pollution Contingency Plan
(commonly referred to as the National Contingency Plan or NCP).

11.5.2 Cost Recovery

CERCLA Section 107 provides for the recovery of certain  costs expended by the government in
responding to environmental contamination from responsible parties (as defined above).  These
response  costs must be incurred as  a result of a release or threatened release of a hazardous
substance from a facility.  In order for the United States, a state, or Indian tribe to recover costs
under this provision of CERCLA, the costs incurred have to be "not inconsistent" with the NCP.
Liabilityfor response costs is strict, joint and several, and  retroactive.  The burden of proof as to
whether harm is indivisible is on the  defendant, not on the government.

-------
11-6  Chapter 11: The Regulatory "Toolbox"
Like most recovery provisions in the law, EPA's cost recovery authority does have a statute of
limitations. For removal actions, EPA must commence its cost recovery action within three
years of completion of the removal action (unless the removal action proceeds into a remedial
action). For remedial actions, EPA must commence its cost recovery action within six years of
the initiation of physical on-site construction of the remedial action.

EPA has developed a "prospective purchaser" policy which affords a party interested  in the
purchase of contaminated properties with protection from CERCLA liability by entering into a
settlement with the United States.  Application of the policy can be difficult, as there are many
criteria that must be met,  including a federal interest in the  contaminated property, substantial
benefit to the Agency, the safety of continued operations, risk to persons at the site, municipal
interest, environmental justice, etc.  From a mining site perspective, however, it may be a
worthwhile option to consider.

11.5.3 Civil Penalties

CERCLA imposes a fine of $25,000 per day for failure to comply with an order issued under
CERCLA (Sections 106(b) and 109).  In addition, if EPA spends Superfund dollars performing
work where a responsible party has failed to perform such  work under order, that party may  be
liable for punitive damages in an amount equal to three times the costs incurred by the United
States.  (Section 107(c)(3)).  When EPA enters into consensual agreements with responsible
parties for the performance of work, it may also require stipulated penalties for the responsible
party's failure to adhere to the requirements of the agreement.

11.5.4 Criminal Penalties

Criminal penalties exist under only two provisions of CERCLA. The first is for failure to provide
notification of a release of a reportable quantity of a hazardous substance (Section 103(b)); the
second is for destruction of records that are supposed to be maintained under the Act (Section
103(d)).

11.5.5 Information Collection

Section 104(e) allows for  investigations, monitoring, surveys, testing, and other information
gathering appropriate to identify the existence and extent of a release or threat thereof; the
source and nature of hazardous substances or pollutants or contaminants; and the extent of
danger to public health or welfare or the environment.  Studies that may be conducted using the
information gathering authorities of section 109 may include planning, legal, fiscal, economic,
engineering, architectural, or others studies necessary or appropriate for planning and directing
response actions, recovering costs, or enforcement.

Specifically, Section 104(e)(2) requires that parties provide EPA with all information or
documents relating to (A) the identification, nature, and quantity of materials generated, treated,
stored, or disposed of at a facility; (B) the nature and extent of a release or threatened release
of a hazardous substance, pollutant, or contaminant; and (C) the ability of a person to pay for or
perform cleanup.

Section 104(e)(3) provides the Agency with the authority to enter anyplace where a hazardous
substance or pollutant or contaminant (A) may have been generated, stored, treated, disposed
of, or transported from; (B) or from which there is a release or threatened release of a
hazardous substance; (C) or any place where entry is needed to determine the need for
response, the appropriate response, or to effectuate a response.

-------
                                               Chapter 11: The Regulatory "Toolbox"  11-7
Section 104(e)(4) gives EPA the authority to inspect, and obtain samples from, any location or
containers of suspected hazardous substances, or pollutants or contaminants.

If a party refuses to consent to EPA's information collecting activities, the Agency may issue
orders and/or seek court intervention providing for the collection of information and provision of
access. Access may be granted through a warrant (where short-term access is necessary) or
by court order (for long-term or intrusive access drcumstances).

CERCLA Section  103 also requires any person who is in charge of a facility from which a
hazardous substance is released to report that release if it equals or exceeds the reportable
quantity for that hazardous substance listed pursuant to Section 102 of the Act. Section 103
also requires any  owner or operator of a facility, owner at the time of disposal at a facility, and
transporter who chose to dispose of hazardous substances at a facility to notify EPA of the
existence of such  facility if  storage, treatment, or disposal of hazardous substances have
occurred at such facility. Thus, Section  103 provides broad authority for requiring the
submission of information  necessary to identify the location of sites needing  EPA's attention.
11.6  Other Superfund "Tools "

11.6.1 Funding

The Superfund is funded by both a tax on the chemical industry and some smaller contribution
of appropriated funds. The Superfund typically has enough money available to perform
necessary investigatory and cleanup activities. CERCLA does contain fund-balancing criteria to
ensure that the fund does not deplete its resources on anyone site. Cost recovery by the
government is a  critical element of ensuring the adequacy of Superfund.

11.6.2 Natural Resource Damage Provisions

CERCLA Section 107(a)(4)(C) provides for
the recovery of damages for injury to,
 ....    ,    ,      ,   .    .                   ARCO Natural Resource Damage Settlement
destruction of, or loss of natural resources,
                                                            Highlight 11-1
                                             In November 1998, ARCO settled their Natural
                                             Resource Damage Claims with the Federal
                                             government, State of Montana, and the Confederated
                                             Salish and Kootenai Tribes. The agreement sets
                                             forth terms under which ARCO will pay to remediate
                                             and restore Silver Bow Creek.  In addition, ARCO
                                             resolved the State and Tribes natural resource
                                             damage claims for the Clark Fork River Basin.
including the reasonable costs of assessing
such injury, destruction, or loss. "Natural
resources" as defined at CERCLA Section
101(16) means "land, fish, wildlife, biota, air,
water, ground water, drinking water supplies,
and other such resources belonging to,
managed by, held in trust by, appertaining to,
or otherwise controlled by the United
States...any State or local government, any
foreign government [or] any Indian tribe... ." EPA is not responsible for recovering "natural
resources" damages due the federal government, as this responsibility generally lies with those
agencies that administer federal lands or are resource trustees. (See Section 107(f)(1) and (2)
and 1220).)

11.6.3 Good Samaritan Provisions

Section  107(d) of CERCLA provides exceptions to liability for those rendering care or advice at
the direction of an On-Scene Coordinator (OSC) or in accordance with the NCP. A  private
party who is not otherwise liable at the site, and provides advice or care at the direction of an
OSC in accordance with the NCP, will be exempt from liability for any costs incurred as a result
of actions or omissions by that party unless those actions or omissions are negligent.

-------
11-8   Chapter 11: The Regulatory "Toolbox"
State and local governments are exempt from liability under CERCLAfor actions taken in
response to an emergency created by the release or threat of release of hazardous substances
from a facility owned by another person. Such exemption does not cover gross negligence or
intentional misconduct.  As with private  parties, the state or local government cannot take
advantage of this provision if it is otherwise liable for the release.

11.6.4  Native American Tribes

Section 126 of CERCLA provides that Indian tribes shall be afforded substantially the same
treatment as states with respect to CERCLA's notification, consultation on remedial actions,
information collection, health authorities, and consultation consistent with the National
Contingency Plan.  Section 104(d) of CERCLA also authorizes the Agency to enter into
cooperative agreements with tribes. Section 107 also gives tribes equivalent authority as given
to states and the federal government to recover response costs and damages to natural
resources.
11.7 Limitations

11.7.1  Federally Permitted Release

EPA's ability to address environmental problems at mining and mineral processing sites may be
limited when a release of concern has been granted a permit under a federal government
program listed in Section 101(10).  Even though such a release can be addressed under
Section 104 of CERCLA (i.e., EPA may still perform any necessary remediation), EPA's
authority to recover costs for such activities is removed (Section 107(j)) and its authority to
order others to do the work is questionable.

11.7.2  Pollutants and Contaminants

As described  above, some contaminants, such  as sulfate, do not fall under the definition of
"hazardous substance." These contaminants can be captured under the definition of "pollutant
and contaminant," but  the authority afforded the Agency under Section 104 of CERCLA to
address such contaminants  is significantly less  than that afforded under Section 106 to address
hazardous substances. EPA may not be able to order responsible parties  to address pollutants
and contaminants or be able to recover costs incurred in responding to their releases.
11.8 Ability to Integrate with Other Statutes

CERCLA is a powerful tool for investigation and cleanup of mining and mineral processing
sites. Its applicability at mining and mineral processing sites is broad, and can often be used
when other environmental statutes have failed to address environmental problems. CERCLA
also can provide synergistic effects when combined with other statutes because of its 1)
retroactive, joint, and several  liability; 2) remedial capabilities through Superfund financing; and
3) site-specific flexibility through risk assessment and ARARs analysis. When evaluating the
use of CERCLA at a site also consider integrating its use with other authorities to achieve the
best mix of cleanup tools for each site.

-------
                                              Chapter 11: The Regulatory "Toolbox"   11-9
11.9 Federal Facilities and Other Federal Issues

CERCLA Section120 subjects federal agencies (e.g. USFS, BLM, NPS, and DOD) to CERCLA
requirements. CERCLA requirements are similar forfederal and private facilities; however,
CERCLA Section 120 set out certain additional requirements applicable to federal facilities.  For
example, Section 120 requires that EPA establish the Federal Agency Hazardous Waste
Compliance Docket listing federal facilities that are or may be contaminated with hazardous
substances. EPA then evaluates the facilities on the docket and, where appropriate, places
facilities on the NPL. If a federal facility is placed on the NPL, Section120(c)(1) requires the
federal agency that owns or operates  the facility to commence an RI/FS within six months of the
facilities placement on the NPL. Upon completion of the RI/FS,  Section 120(c)(2) requires the
federal agency to enter into an interagency agreement (IAG) with EPA for completion of all
necessary remedial action at the facility. Under CERCLA Section 120(e)(4), lAGs must at a
minimum include the selection of the remedy, the schedule for the completion of the remedy
and arrangements for long-term O&M of the facility.

As a matter of practice, EPA and the responsible federal agency often agree to enter into an
IAG during the initial study phase (RI/FS) or just after the placement of a facility on the NPL.
States are encouraged to become signatories to  lAGs where possible.

Funding for remedial actions at federal facilities generally must come from the responsible
federal agency's appropriations because, with  limited exceptions, CERCLA Section111(e)(3)
prohibits the use of Fund money for remedial actions at federal facilities.

Executive Order 12580 delegates and the President's CERCLA authorities among the various
federal agencies.  Under EO 12580, DOD and DOE have been delegated most of the
President's Section 104 response authorities for releases or threatened releases of hazardous
substances on or from facilities under their "jurisdiction, custody or control".  Other federal
agencies have been delegated Section104 authorities for releases or threatened releases of
hazardous substances on or from facilities under their jurisdiction, custody or control that are
not on the NPL. EPA has been delegated the  balance of the President's CERCLA response
authorities (except for releases or threatened releases to the coastal zones, Great Lakes
waters, ports or harbors, which are delegated to the Coast Guard). Executive Order 13016
amended EO 12580 to authorize certain federal agencies (including land manager agencies) to
issue administrative orders  under Sections 106 and 122 (with EPA concurrence) for releases or
threatened releases at their facilities.

Thus, federal land manager agencies  are authorized to address non-NPL mine sites on their
property much in the same  way EPA is authorized to address privately owned mine sites.
Including issuing Section106 orders for  response actions or performing response actions
themselves and seeking cost recovery from  PRPs. Because of  the limitation on the use of
Fund money in Section 111(d)(3), the federal land manager agencies must rely on its own
appropriations.  The federal agendes most often associated with these sorts of actions are the
Department of the Interior through the Bureau  of Land Management (BLM) and the Department
of Agriculture through the U.S. Forest Service  (USFS). Both of these agencies are moving
forward with a variety of programs to identify and characterize abandoned mines and
processing facilities on lands under their jurisdiction. Mining sites often cross boundaries
between federal and private ownership. Such  "mixed ownership" sites require the presence of
EPA since, although agencies other than EPA may issue Section 106 orders for response
action on federally owned lands. Federal Land Managers will wish to help make decisions in
devising remediation at mixed  ownership sites, especially where long-term operation and
maintenance of a remedy may be required.  EPA may also wish to explore  having federal land
managers undertake some CERCLA  enforcement actions using other authorities.

-------
11-10   Chapter 11: The Regulatory "Toolbox"
Because of their overlapping authorities, appropriate coordination must occur between EPA and
the applicable federal agencies at mining and mineral processing sites.  For a site which is
located partly on federal and partly on privately owned land, a Memorandum of Understanding
(MOU) may be used to define specific roles and responsibilities of each agency.  In some cases
it may be appropriate under an MOU to divide responsibilities, focusing CERCLA activity only
on certain prescribed units. Whichever administrative vehicle is utilized, it is important to divide
responsibilities in ways that make technical sense and in order to use federal dollars wisely.
11.10 Other Regulatory Tools

CERCLA is undoubtedly the most flexible and useful regulatory tool for addressing
environmental problems at mining sites. CERCLA is not limited to a particular media, such as
water, but it applies to all media; it provides flexible funding for cleanups, through payment for
or direct implementation of cleanups by responsible parties or by the government; and it
provides for the study and implementation of site-specific approaches to environmental
problems. EPA and other federal agencies will often utilize CERCLA when attempting to
address environmental  problems at mining sites.  However, in certain situations, other
regulatory tools may also be appropriate. These are discussed briefly, and compared to
CERCLA below. A detailed discussion of these authorities is contained in Appendix C of EPA's
National Hardrock Mining  Framework.

11.10.1  Clean  Water Act

After CERCLA  the Clean Water Act (CWA) is probably the next most widely used regulatory
tool for addressing environmental problems at mining sites.  Section 402 of the CWA
authorizes EPA or delegated states to regulate "point source discharges" of "pollutants" to
"waters of the United States."  Each discharge must be permitted.  Section 404 of the CWA
provides authority for regulating the discharge of "dredged or fill material."  Many mine sites
suffer from the uncontrolled discharge of acidified water, which becomes contaminated as it
flows through abandoned  mine workings. Section 402, in particular, may be of use as EPA or
states try to control this flow.  Under Section  309 of the CWA, EPA or states may proceed
administratively or judicially against "any person" discharging without a permit or in violation of a
permit. Thus, if a mine site is discharging contaminated waters, and if a responsible person
can be identified, EPA or a delegated state maybe  able to address the problem.

On the other hand,  the  utility of the CWA as a regulatory tool is limited compared to CERCLA.
Where CERCLA applies to all media, the CWA applies to water only. Further, the CWA
regulates only "discharges" to "waters of the United States" from "point sources." In 1990, EPA
promulgated the regulatory definition of industrial  activity to include inactive mining operations.
Under the stormwater program, runoff from mining operations requires a permit if it comes into
contact with overburden, raw material, intermediate products, finished product, byproduct, or
waste products located on the site of such operations. Also, action under the CWA to address
water contamination depends on the existence of owner or operator who is responsible for
obtaining a permit.

11.10.2 Resource Conservation and Recovery Act

RCRA governs the management of solid and hazardous wastes under two regulatory tracks.
RCRA Subtitle D addresses "solid" wastes, while  Subtitle C addresses "hazardous" wastes.  In
October,  1980, Congress  excluded from regulation  under Subtitle C "solid wastes from the
extraction, beneficiation, and processing of ores and minerals" until such time as required
studies were completed and reported to Congress.  Referred to as the "Bevill amendment," this
provision effectively excludes "extraction" and "beneficiation" and 20 specific "processing"

-------
                                             Chapter 11: The Regulatory "Toolbox"  11-11
wastes from regulation as "hazardous" wastes.  Most processing wastes continue to be
regulated under Subtitle C, provided they meet the requirement set forth in 40 CFR 261.24 for
consideration as "hazardous" wastes, because they exhibit the toxicity characteristic.

Perhaps more useful for dealing with mining wastes are the requirements of Section 7003 of
RCRA. A "miscellaneous" provision under RCRA, Section 7003 allows EPA to address any
"imminent and substantial endangerment to health or the environment" arising from the past or
present handling, storage, treatment, transportation or disposal of any solid waste or hazardous
waste. The release need not be at a facility otherwise  subject to RCRA regulation, and its
application to solid waste as well as hazardous waste makes  it available for mining waste
despite the Bevill exclusion. In many respects, Section 7003  order authority is comparable to
orders under Section 106 of CERCLA and may be issued to current or former handlers, owners,
operators, transporters, and generators.  EPA may issue an administrative order or seek an
injunction in federal district court to stop the practice causing  the danger and/or take any other
action necessary.  Violators of an administrative order  under Section 7003 may be penalized up
to $5,000 per day.  Although the operation of Section 7003 of RCRA is similar to that of
Section 106 of CERCLA, RCRA does not contain funding mechanisms allowing for government
funding of cleanups.

11.10.3 Toxic Substances Control Act

The Toxic Substances Control Act (TSCA) allows  EPA to regulate the manufacture (including
import), processing, distribution, use, and disposal of chemical substances.  Under TSCA, EPA
may require health and environmental effects testing by manufacturers, importers and
processors  of chemical substances, which include organic and inorganic substances occurring
in nature, as well as chemical elements.  TSCA also authorizes EPA to require record keeping
and reporting of information that is useful for the evaluation of risk, regulate chemical
substances that present an unreasonable risk of injury to health or the environment, take action
to address imminent hazards, require notification to EPA by prospective manufacturers of new
chemicals, and make inspections or issue subpoenas when needed to implement TSCA
authorities.

In practice, the most useful tool under TSCA has been the  regulations pertaining to
polychlorinated biphenyls (PCBs) promulgated under Section 6 of TSCA, as codified in 40 CFR
Part 761. The mining industry has traditionally used high levels of PCBs as the dielectrics in
transformers and capacitors, which are commonly found wherever there is a high electrical
power demand. Transformers and capacitors can be found in any phase of surface  or
underground mining operations and the ore beneficiation process.  PCB equipment has been
replaced in  many mines and all mines built after the ban on production of PCB equipment
should no longer be using electrical equipment containing PCBs.

The disadvantages of TSCA at mining sites as compared with CERCLA are that its applicability
is limited, and it contains no funding mechanisms that may  be used where a viable responsible
party is not  present.

11.10.4 Miscellaneous Requirements

Other federal regulatory requirements which may be of some use for addressing environmental
problems at mine sites include the Clean Air Act, the Emergency Planning and Right to Know
Act, and the Safe Drinking Water Act.  These are not discussed here as they are of relatively
limited use to site managers when they are addressing environmental problems at mining sites.
Although not discussed here, these provisions are discussed  in detail in Appendix C of EPA's
National Hardrock Mining Framework.  In addition to the federal regulations discussed here,
there are numerous State, Tribal, and local regulations that can be utilized by the site manager.

-------
11-12  Chapter 11: The Regulatory "Toolbox"
77.77 Non-Regulatory Tools

In addition to the federal regulatory tools previously described in this chapter, there are a
number of non-regulatory tools that may be available to the site manager. Non-regulatory
approaches available to address environmental challenges posed by mining are typically
employed to complement existing regulatory programs in addressing mining impacts; however,
there have been some instances where they have been used independently of any regulatory
framework. While current regulatory programs can often be adapted to address the
environmental problems posed by mining, they can  be cumbersome, expensive to administer,
and understaffed. Non-regulatory tools have been developed to take advantage of the
incentives created by a backdrop of enforcement oriented regulatory programs, or to coordinate
these programs to maximize their overall impact.  For example, when cleanups precede active
enforcement of regulatory programs they may be easier and less expensive to implement.
While recognizing that each non-regulatory effort is unique, there are certain themes that are
common to the most successful efforts.

The purpose of this discussion of non-regulatory tools include the following:

     Illustrate the key traits of effective non-regulatory tools.  Sometimes these will be based
     on tools that have a regulatory connection, although the emphasis will be on the non-
     enforcement aspects of those authorities.
     Using specific case examples, point out areas where these tools have filled gaps in the
     current regulatory framework.
     Highlight model policies and approaches that  could be the basis for future regulations or
     legislation.
     Point out the main limitations or non-regulatory approaches.

While recognizing that each non-regulatory effort is unique, there are certain themes that are
common to the most successful ones, both site specific and non-site specific. They include the
following.

Active participation by principal stakeholders, including a recognition of the environmental
problems and a willingness to take on the issues. This typically includes federal, state and local
governments, tribes, industry, citizens, and affected landowners.  Participation does not
necessarily mean funding, but it does mean cooperation.

Creative use of limited funding resources, promoting coordination and research on mining
issues.  While little public money is specifically earmarked for mine site cleanup, other
programs, such as EPA's CWA Section 319 funds,  have been successfully used to fund
portions of cleanup projects.  State programs, local  contributions, and private funding by
responsible parties have all been tapped for assessment and cleanup projects.  Technology
demonstrations have sometimes been used to get seed money to develop a new cleanup
approach. These include the University of Montana's Mining Waste Institute, a variety of
groups comprising the Mining Information Network,  and the Western Governors'Association
(WGA).

Site specific flexibility, in adapting non-regulatory tools to fit the specifics of the site and the
interest of the stakeholders.

Pollution prevention, efforts supported by federal  and state agencies, tribes, and other
stakeholders limiting the generation and  use of waste materials.

-------
                                             Chapter 11: The Regulatory "Toolbox"   11-13
Prioritization of cleanup projects, often on a watershed basis, as a way of allocating limited
resources and focusing on worst cases first.

Regulatory discretion as a tool to promote creative problem solving and early implementation
of cleanup projects.  For example, having a site listed as a Superfund site might reduce local
involvement.

11.11.1    Key Characteristics of Non-regulatory Tools

Most non-regulatory approaches contain one or more of the following characteristics.

11.11.1.1   Financial

Financial support often comes from a variety of sources when non-regulatory approaches are
used. Funds are often leveraged, and budgets are typically lean.  Examples include the
following.

Staff Resources. Non-regulatory approaches often take a large amount of staff time and
energy to implement.

RCRA 7007 and 8001  Grant Funds. Section 7007 funds are grants for a wide range of
training programs, for either states or individuals. Section 8001 funds cover research, training,
and other studies related to solid and hazardous waste. Funds in both  of these sections cover
potentially a wide range of projects and have been used extensively to  fund mining research
and technical assistance throughout all EPA media program  offices as  well as the Office of
Enforcement. Funding in  recent years has been as high as $2.5 million, in FY 95 it is expected
to be $500,000.  In FY 89 and FY 90 most of the money went to support WGA related activities;
now funds are used for a variety of media related projects. Categories of funding typically
include research at the Colorado School of Mines on mine waste, funding to maintain an
environmental network, and  funding to regions on mining related  projects.

CWA Section 319 Funds. Section 319(h) established  a demonstration grant program to assist
states in implementing specific projects to demonstrate effective NPS control projects.
Approximately $1,000,000 per year is spent through this mechanism on inactive mine projects,
with oversight in the EPA Regional offices. Types of activities funded include: education, staff
development, technical assistance, project demonstration, and ground  water protection.

Other Federal Agency Funds. These are often used to either supplement EPA funds or to
support specific pieces of a  non-regulatory approach or initiative.  In some instances land
management agencies have large budgets devoted to mining related programs.  These can be
significantly greater than the EPA funds discusses above.

State/Local Partnerships.  Although usually smaller in size  than federal  monies, support from
state and local stakeholders can often fill financial holes in geographic  based approaches.

Voluntary efforts. Good Samaritan work by private parties  can contribute a significant amount
towards cleanup of inactive and abandoned mines.

-------
11-14  Chapter 11: The Regulatory "Toolbox"
11.11.1.2  Institutional

Institutional support is critical for non-regulatory tods to be successful.  These include the
following.

Interagency Agreements.  MOUs, MOAs, and lAGs are all tools that can be used to deal with
the large number of agendes that regulate mining.  When used effectively, they can help clarify
roles and streamline the overall regulatory process. For example, as part of the Coeur d'Alene
Restoration Project a MOA between EPA, the State of Idaho and the Coeur d'Alene Tribe was
instrumental in helping reduce differences among the parties and focusing efforts on restoration
goals.

External/Internal teamwork. At a less formal level, interagency groups are often an effective
means of focusing attention on certain projects or issues.  They provide a way for individuals
with expertise to interact.  These coalitions are also and important first step in breaking
regulatory impasses.  The WGA Mine Waste Task Force is such an example.  Within a Region,
internal EPA teams also help focus efforts on  mining issues, such as in Regions 8, 9, and 10,
where most of the staff participation on mining teams is voluntary.

Regional and National Initiatives. These are also a useful way of improving communications
and focusing efforts on addressing mining problems. The site specific approaches described in
more detail in Appendix C of EPA's National Hardrock Mining Framework are all examples of
such initiatives at the  regional level.

Outreach.  This ranges from detailed outreach to a local community to simply providing on-site
staffing at critical junctures during a remediation. One type of outreach, involving community
based environmental  indicators, can provide an important link with strategically significant
technical tool, watershed planning.

11.11.1.3  Technical

Technical assistance.  This would include the dedication of either Agency staff or contractor
hours to  providing direct help to a stakeholder. This is often an effective tool in working with
other agencies and states.

Analytic methodologies.  These can range from predictive tools to well developed monitoring
and testing standards that help make data analysis consistent.  Examples include: resource
assessment and goal setting methods, alternatives development, and cost effectiveness
methodologies. One  specific example of this  is the State of Montana, which has developed an
MRS type system used for priority setting.

Technical demonstration.  Technology demonstration efforts have had a couple of roles in
non-regulatory efforts. One is a traditional means of identifying new and effective treatment
technologies. Another is that non-regulatory approaches themselves have been able to attempt
less proven methods  than more regulatory, Superfund type approaches to remediation.

Education and Training. Because of the multimedia nature of mining issues, training is often
necessary to bring key players up to speed on technical or regulatory issues. Education efforts
on a more broader scale have been used to highlight and  respond to community concerns
regarding the impacts of mining and regulatory activities.

-------
                                             Chapter 11: The Regulatory "Toolbox"  11-15
Standardization Analysis and Monitoring Methods.  Different agencies use different
methods for measurement ranging from simple location data to kinetic testing methodologies.
Efforts to standardize this information make priority setting and monitoring significantly easier.

11.11.2    Other Characteristics

Enforcement Discretion.  Where there is a significant enforcement history in connection with
non-regulatory initiative, enforcement discretion is often a factor in helping to build a working
coalition amongst a variety of players.

Institutional Controls. These include a variety of approaches, such as deed restrictions and
other local regulations, that can be useful as part  of an overall strategy.

11.11.3    Limits

There are limits to what can be accomplished with non-regulatory tools. These would include
the following.

Staff resources.  One of the main drawbacks on non-regulatory tools are the large amount of
staff time needed to make them successful.  To some extent, though, this may be a matter of
perception only.  Although these approaches can require  significant staff resources, they can
avoid a much higher resource cost in the future if properly focused.

Enforcement related issues. As a result of the  regulatory backdrop for many of these
examples, enforcement and liability can obstruct or delay non-regulatory, cooperative or Good
Samaritan efforts.

Liability concerns.  Sometimes private parties are reluctant to take action under a non-
regulatory framework as such effort often do not address potential liability concerns. Efforts are
underway to address these concerns through amendments to the CWA and CERCLA.

-------
11-16   Chapter 11: The Regulatory "Toolbox"
                                       NOTICE

  This document provides a reference resource to EPA and other staff addressing abandoned
  mine sites. The document does not, however, substitute for EPA statutes, regulations and
  guidance, nor is it a regulation itself.  Thus it cannot impose legally-binding requirements on
 EPA, States, or the regulated community, and may not apply to a particular situation based  on
  the circumstances.  EPA may change this reference document in the future, as appropriate.

-------