Introduction	   4

Northeast/Merrimack Valley Consortium of Water and Wastewater Facilities,
   Massachusetts
   Informal Cooperation 	  6
City of Panora Water System, Iowa
   Contractual Assistance	  8
Tripp County Water User District, South Dakota
   Interconnection of Stand-alone Systems	  10
Logan-Todd Regional Water Commission, Kentucky
   Joint Powers Agency with Interconnection	  12
Canyon Regional Water Authority, Texas
   Joint Powers Agency with Interconnection	   14
Ellsworth Estates Water Company /
   The Connecticut Water Company, Connecticut
   Ownership Transfer	  16
White Sand Beach Water Company, Inc. /
   The Connecticut Water Company, Connecticut
   Interconnection to a Satellite System	  18
Prairieton Water Company / Indiana American Water Company, Indiana
   Ownership Transfer with Interconnection	  20
Mountain  Regional Water Special Service District, Utah
   Ownership Transfer with Interconnection	  22
Possum Kingdom Water Supply Corporation, Texas
   Ownership Transfer with Interconnection	  24

Acknowledgements	  26

Contact Information..                                                     26
Further Information ..                                                     26

-------
                                                                                  Introduction
Drinking water systems, especially small systems serving 3,300 or fewer customers, often face significant
challenges in providing safe, reliable drinking water to their customers. These challenges require water system
managers to make decisions on a range of issues. Management decisions for water systems should start with
the concept of "level of service"—criteria that establish what the system's customers expect in terms of product
quality and service.

Once a level of service has been established, a system can determine which short-term and long-term technical
and financial issues it needs to tackle. Short-term issues focus primarily on operations and maintenance (O&M).
Longer-term issues are those associated with infrastructure needs, quality of source water, decisions about
adequacy of treatment, and questions about the availability of water resources to meet consumer demand.
These longer-term issues have often been ignored because of the legacy of capital investment made by previous
generations. As infrastructure ages, however, these issues must be addressed. At some point, systems may need
to change the way they do business. Forming partnerships with other systems is a proven approach that can
provide systems with a wide range of options and benefits.

Partnership options can range from informal arrangements, such as sharing equipment, to transferring
ownership of a system through consolidation (see Exhibit 1). Neighboring systems can physically connect
and share treatment and infrastructure. For example, small systems whose source water exceeds a maximum
contaminant level (MCL) may find it is more  cost-effective to connect to a nearby regional system than
to install treatment and comply with the MCL. Or, to reduce administrative and operating costs, several
systems might agree to create a Joint Powers Agency or to consolidate under common regional ownership or
management while maintaining separate infrastructure and treatment.
           • Increasing Transfer of Responsibility
  Informal Cooperation  I Contractual Assistance I  Joint Powers Agency  I  Ownership Transfer
  Work with other
  systems, but without
  contractual obligations
Requires a contract, but
contract is under
system's control
Creation of a new entity
by several systems that
continue to exist as
independent entities
Takeover by existing or
newly created entity
  Examples:
  • Sharing equipment
  • Sharing bulk supply
   purchases
  • Mutual aid
   arrangements
Examples:
•O&M
• Engineering
• Purchasing water
Examples:
• Shared system
 management
• Shared operators
• Shared source water
Examples:
•Acquisition and
 physical interconnection
•Acquisition and
 satellite management
• Transfer of privately-
 owned system to new
 or existing public entity
 Exhibit 1: The System Partnership Spectrum

-------
Gaining Operational and Managerial Efficiencies Through Water System Partnerships: CASE STUDIES
The potential benefits of partnerships are numerous and significant:

   •   From an economic perspective, partnerships can help reduce capital and operating costs and prices (per
       gallon of finished water produced) through increased economies of scale.

   •   From a financial perspective, partnerships can help raise the capital needed to replace and improve aging
       water-delivery infrastructure.

   •   From an engineering perspective, partnerships can improve operational performance through wider use
       of trained operators and advanced treatment technologies.

   •   From a natural resource perspective, partnerships can enhance environmental protection, resource
       conservation, and contingency planning for conditions of scarcity, brought about by natural or other
       supply emergencies, through increased coordination and integrated planning.

States can also realize important benefits from system partnership  activities. For example, partnerships can be
an effective means for helping small water systems achieve and maintain technical, managerial, and financial
(TMF) capacity, thereby reducing the oversight and resources that the state will need to devote to these systems.

The case studies profiled on the following pages provide examples of the many ways systems can form
partnerships, and of the managerial and operational efficiencies and other important benefits that system
partnerships can provide.

-------
                  Northeast/Merrimack Valley Consortium of Water
                               and Wastewater Facilities,  Massachusetts
The Northeast/Merrimack Valley Consortium of Water and Wastewater
Facilities (MVC) is a group of northeastern Massachusetts communities
that informally cooperate to purchase supplies in bulk. It is made up of
35 towns and their water and wastewater systems. The MVC has helped
the systems reduce costs by using their combined purchasing power and
negotiating lower prices from vendors. The systems also benefit from
sharing information and experiences.

FACTORS  LEADING TO THE PARTNERSHIP
Before the partnership was formed, the water systems individually
negotiated prices for supplies and chemicals. Because each system had relatively limited needs, it paid a high
price for water treatment chemicals and laboratory supplies. Consequently, systems spent resources on supplies
that could have been used to meet other needs.

KEY PLAYERS AND  DRIVERS

While the systems themselves were the drivers of the partnership, the chief operator of the Tewksbury water
treatment plant played a leading role in organizing the founding cities and towns. The MVC has evolved over
time. It initially focused only on purchasing laboratory supplies in bulk.
As the benefits of bulk purchasing became apparent, the consortium
quickly expanded its scope to include treatment chemicals and other
goods and  services.
                                                                Partnership Snapshot
                                                                Informal Cooperation
                                                                35 municipal systems negotiate for
                                                                and purchase laboratory supplies and
                                                                treatment chemicals together.	
                                                                Timeline
                                                                Mid-1980s:  MVC is formed
Each year one system serves as the "buying agent" and two other
systems provide support so that over the next 2 years, when they
become the buying agents, they have the necessary skills and knowledge
to negotiate purchase agreements. In this way, all the systems share
responsibility and each eventually leads the buying process. This
arrangement is designed to maintain institutional knowledge about
purchasing and ensure continuity in negotiating with vendors.

The MVC's members have other opportunities to share information on the wide variety of issues. In a series
of five annual meetings  the systems determine their needs and then negotiate and finalize agreements with
vendors. Each meeting also provides an opportunity for participating systems to share challenges and best
practices. Members are  expected to meet American Water Works Association standards and honor contracts
made through the consortium. The systems cannot pursue vendors independent of the MVC. This informal
system of self enforcement has made the partnership a success.

-------
Gaining Operational and Managerial Efficiencies Through Water System Partnerships: CASE STUDIES
BENEFITS OF THE  PARTNERSHIP
The partnership provides a way for member systems to reduce costs and build operational and managerial
efficiencies. Specific benefits are presented below.
 Technical
      Shared service: Purchasing in bulk has enabled the MVC to establish contracts with suppliers and maintain a secure supply
      of treatment chemicals.
      High-quality products and service: The MVC has the power to hold vendors accountable when contractual obligations
      are not met and can stop doing business with vendors whose goods or services do not meet MVC standards.	
 Managerial
      Information sharing: Regular meetings provide opportunities for systems to share experiences, challenges, and best
      practices.	
 Financial
      Economies of scale: MVC partner communities have reduced the average long-term costs of operating treatment plants
      by purchasing treatment chemicals in bulk rather than in small quantities.	
      Economies of scale: MVC partner communities have more vendors competing for their business, which gives them more
      options when soliciting bids.	
      Reduced costs: Purchasing in bulk enables the systems to reduce purchasing expenses and allocate those resources to
      other system needs.
LESSONS LEARNED
The partnership has been so successful it has had to limit membership to communities and systems in a
defined geographic area. Since the MVC's initial formation, some systems have left the consortium and formed
similar, but smaller, consortiums along Massachusetts' south shore. The MVC's founders succeeded in forming
a partnership that meets its members' common needs and provides them with significant financial benefits
without requiring communities to give up local control of the water systems.

-------
                                          City of Panora Water  System, Iowa
The City of Panora Water System has formed beneficial partnerships      7~
with its neighbors in central Iowa through contractual assistance. Panora   /
is a municipal water system that serves 1,200 persons and has 700         \
connections, most of them residential. It cooperates with nearby public     1
and privately owned water systems and districts. This cooperation has
helped Panora improve its water quality by interconnecting to another
source, enhancing the capabilities of its staff through training, and
reducing its treatment costs.                                             ^	 J

FACTORS LEADING TO THE  PARTNERSHIP
Panora faced technical, managerial, and financial challenges before it reached out to neighboring systems. High
nitrate levels during the spring and early summer exceeded the maximum contaminant level by 20 to 40 percent.
The system had difficulty retaining operators  and came to rely on operators from the Des Moines Water Works
(DMWW) to fill in occasionally. Panora lacked the financial resources to pay competitive wages to attract a
certified operator and to install nitrate treatment.

KEY PLAYERS AND DRIVERS
To overcome the high nitrate levels, Panora worked with the Lake
Panorama Water Company (LPWC) to install a water line between the
systems so Panora could buy water to blend with its high-nitrate source
water, as needed.

Panora has cooperated with the LPWC and the Xenia Rural
Water District to complete a joint water study and assess potential
partnerships. Many of the options identified in the study are still
being evaluated by the three systems, while plans are being made to
implement some of the recommendations. Panora also conducted a pilot
test of an arrangement in which the DMWW remotely monitored the
Panora treatment plant.
Partnership Snapshot
Contractual Assistance with
Interconnection
Panora has partnered with neighboring
systems to purchase water and receive
training.	
Timeline
2002: Panora interconnects with Lake
     Panorama Water Company
2003:  DMWW starts to remotely monitor
	Panora's treatment plant	

-------
Gaining Operational and Managerial Efficiencies Through Water System Partnerships:  CASE STUDIES
BENEFITS OF  THE PARTNERSHIP
The informal cooperative created a mechanism for building operational and managerial efficiencies in Panora.
Specific benefits are presented below.
 Technical
      Shared infrastructure: Panora installed a water line to interconnect its clear well at the treatment plant with the LPWC
      so Panora can purchase water from the LPWC's low-nitrate source. To overcome the high nitrate levels it faces periodically.
      Panora simply opens the valve from the new line to mix in LPWC's finished water. The blending reduces the concentration
      of nitrates to acceptable levels so Panora's finished water meets the nitrate MCL.	
 Managerial
     Expertise: Panora's operators obtained additional certifications and then worked with DMWW operators to identify ways
     to streamline operations. This relationship helped Panora quickly build in-house expertise.	
     Efficiency: The DMWW's remote monitoring of the Panora treatment plant has reduced the demand for on-site operators
     and freed employees for other duties.
 Financial
     Reduced long-term costs: By outsourcing treatment plant monitoring, Panora avoided the cost of installing and operating
     nitrate treatment and of hiring extra personnel.
Another benefit of the partnership is a continued dialogue with neighboring systems focusing on water
efficiency and determining better ways to treat and distribute water in the region. In hindsight, Panora wishes it
had laid two parallel pipes interconnecting to LPWC. If these pipes had been installed, Panora could transport
raw water from the LPWC wells, treat it at its water treatment plant, and send the finished water to the LPWC
for distribution. The LPWC has its own treatment plant, but it is much older than Panora's, which may be more
economical to operate and could provide backup to the LPWC plant.

LESSONS  LEARNED
System-driven efforts to reach out and cooperate with neighboring systems can lead to more efficient uses of
limited personnel resources. In this case, the small system of Panora was able to significantly reduce its costs
and improve capacity. By diversifying water sources, the Panora system addressed technical treatment challenges
presented by its original source. Overcoming what would otherwise be an expensive challenge can be easily
accomplished when systems are able to work together and make small, mutually beneficial changes. The systems
discussed here have learned to continue a dialogue to anticipate and work together to meet future needs.

-------
                        Tripp County Water User District, South Dakota
   The Tripp County Water User District (TCWUD) comprises eight
   interconnected, independent systems serving over 2,700 customers
   in southern South Dakota. The water systems operate and maintain
   their own distribution systems. The partnership has helped the systems
   overcome water shortages and improve water quality by interconnecting
   and distributing water from a higher quality source.

   FACTORS LEADING TO  THE  PARTNERSHIP
   Before the partnership was formed, the area communities faced
   technical challenges related to water quantity and quality. For example, two of the seven wells in the town of
   Burke became infected with iron-eating bacteria and no longer met drinking water standards. Many of the other
   systems had nitrate concentrations approaching the maximum contaminant level. Four counties experienced
   water shortages and contamination problems.

   KEY  PLAYERS AND DRIVERS
   TCWUD's expansion was started by a request from the nearby Rosebud Sioux Tribe to extend service to one
   of its communities. During the planning and proposal phase, additional rural farmsteads and communities that
   depend on confined aquifers or limited surface water opted to interconnect and buy water from the TCWUD.
   The project eventually grew to include the original  Sioux area and seven additional communities.

   State funding sources and South Dakota's governor were key supporters of the TCWUD's interconnection
   project. In 2002, the state approved $3,648,000 in Drinking Water State Revolving Fund (DWSRF) loans
   for the  TCWUD to expand its rural water systems and extend its service line to connect with seven other
   communities in the area. The funds made a major contribution
   toward the over $6 million total estimated cost of the expansion and
   consolidation. To encourage consolidation, the state DWSRF gives a
   significant point value in its funding priority rating  system to proposals
   that include the expansion of rural water  systems. In the context of
   state project review, consolidation aimed at improving overall system
   efficiency or viability is encouraged.
Partnership Snapshot
   The TCWUD effort was also supported by the state Consolidated
   Water Facilities Construction Program. The program provides funding
   for water, wastewater, and watershed projects across South Dakota. In
   2006, the TCWUD received a $350,000 grant from the program to
   expand to a system serving 155 customers. This project also received
   support from top elected officials when Governor Mike Rounds
   endorsed it.
Interconnection of stand-alone
systems
The systems served by TCWUD continue
to operate and maintain their own
distribution systems without TCWUD's
involvement.
Timeline
2002: The state approves funding for
     interconnections between seven
     systems
2006: The state approves funding for
     interconnection to an additional
     system
10

-------
Gaining Operational and Managerial Efficiencies Through Water System Partnerships:  CASE STUDIES
BENEFITS OF THE  PARTNERSHIP
The interconnection of the eight stand-alone systems created a mechanism for building operational and
managerial efficiencies in the area. Specific benefits are presented below.
 Technical
      Higher quantity source water: Systems connected to the TCWUD are able to meet their projected maximum demands for
      the future.
      Higher quality source water: Partner communities now receive treated water from wells drilled into the Ogalala aquifer
      and no longer need to deal with nitrate problems. TCWUD nitrate concentrations for all communities are less than 50
      percent of the maximum contaminant level.	
      Shared infrastructure: All of the communities benefit from TCWUD's treatment plant, and five communities share a
      transmission pipeline that runs along a local highway.	
 Managerial
      Expertise: The partnership has created a forum for the systems to share expertise and to work together to solve common
      problems.	
 Financial
      Economies of scale: The TCWUD decreases long-term average maintenance and monitoring costs, which has helped
      reduce labor costs.
      Reduced costs: The TCWUD has helped partner systems cut operating expenses. Some systems save about $3,000 a year in
      water testing.	
      Reduced cost: Burke, a town with a population of 680, opted to hook up to TCWUD and avoid an upfront investment of
      roughly $90,000 to dig replacement wells.
Another benefit of the partnership is a shift to sustainable water management. Many of the communities in
the area spend slightly more per gallon of water than they did as independent systems. However, the TCWUD
provides a consistent supply of higher quality water, and the higher rates
represent a move toward full-cost pricing.

LESSONS LEARNED
The TCWUD has been successful because it has received support from
local groups and top elected officials. This broad base of support helped
the TCWUD secure funding from the state. Despite the large upfront
costs, the partnership, and associated infrastructure, was the most cost-
effective alternative compared to each system solving source water
problems alone.
                                                                                At the TCWUD Open House
                                                                                                              11

-------
                       Logan-Todd Regional Water Commission, Kentucky
The Logan-Todd Regional Water Commission (LTRWC) is a Joint
Powers Agency in southwest Kentucky, bordering Tennessee. LTRWC
is made up of a dozen municipal and county water systems, with all but
one located in Logan and Todd counties. Each system serves between
395 and 3,300 customers (meters), and 7 of the 12 serve fewer than
1,000 customers. The partnership has helped the systems overcome
water supply shortages by teaming together to develop a new surface
water supply and regional distribution system.

FACTORS LEADING TO THE  PARTNERSHIP
                                                                           Schematic of the Logan Todd Regional Water
                                                                              Commission (LTRWC) Service Area
                                                                              ElfctonarCWD
                                                                                           lOTrented Line to Lewisborg
                                                                                           ""^    ir,'16'Tieated
                                                                                        Uwisburg }   ILin5 Co Auburn
                                                                           ift'Twitetl water
                                                                           LineioT«raon

                                                                                 !«""•

                                                                           03^Grov3 Y* ' Gutfiiie.
                                                                        a^ffl1
                                                                            WRawVftterLlna^
                                                                              From
 . J/MT1r«t«iiiLl.-
 t X^ to RuaelMllB.
    Ad^rsiilir-
  Mairville
KENTUCKY
  Watertank
Kssr
   Before the partnership was formed, the systems suffered from a variety
   of technical issues related to water quantity and quality. A drought in
   1988 prompted Russellville (Logan County) and its neighboring communities to start looking for new water
   supplies after water shortages became a problem. The search for alternatives gained momentum in 1990 when
   a poultry company was willing to locate a processing plant in Russellville if the city could deliver one million
   gallons of water to the plant each day. At this time, several other water systems in Logan and Todd counties
   were struggling with poor raw water quality. Oak Grove (Christian County) was searching for an alternative
   water supply after realizing that the spring feeding its supply was also vulnerable to drought. The combined
   technical issues were most effectively addressed by building partnerships between the affected systems.

   KEY PLAYERS AND DRIVERS
   Local government was a key driver leading to the formation of the LTRWC. In 1990, the water supply shortage
   and its potential to limit future economic development led the Logan County Chamber of Commerce to form a
   committee and develop a long-term study of water in the region. This action provided key information about the
   area and helped lay a path to the formation of the LTRWC.
   A new water source was needed to address the short- and long-term
   quantity and quality issues faced by the area's systems. Shortly after
   its creation, the LTRWC determined that the Cumberland River in
   Clarksville, Tennessee, was the best available source of water. But in
   order for the river to be a viable supply option, several infrastructure
   projects were necessary, including a treatment plant at the source, a
   transmission line, and interconnections between the water systems. The
   scale of these projects created a major obstacle: funding.

   The Kentucky Drinking Water State Revolving Fund and the state
   rural development agency each had a limit of $1.5 million on its loans.
   However, the prospective benefits of the LTRWC project created
   an incentive for the  state funding agencies to change their approach.
   Additionally, the United States Department of Agriculture Rural
   Development Office offered significant support by committing to long-
   term financing in the amount of $49.8 million. By dividing the project
   into multiple phases, and funding each phase separately, the entire $77.5
                                                                        Partnership Snapshot
                                                                    Joint Powers Agency with
                                                                    Interconnection
                                                                     12 autonomous water systems
                                                                     maintain ownership, and operating and
                                                                     maintenance responsibility for their
                                                                     distribution infrastructure.
                                                                    Timeline
                                                                     1988: Drought prompts systems to
                                                                          consider alternative water sources
                                                                     1990: Long-term water study is
                                                                          commissioned by local chamber of
                                                                          commerce
                                                                     1995: Logan-Todd Regional Water
                                                                          Commission is formed
                                                                     2000: Construction begins
                                                                     2003: Water delivery begins	
12

-------
Gaining Operational and Managerial Efficiencies Through Water System Partnerships:  CASE STUDIES
million project was eventually funded. In addition, the governor provided state budget surplus grants to the
project in 1998 and 2000. These grants were an important source of early funding for the LTRWC. The state,
therefore, played an important role in making the project a reality.
As the project began and the transmission line was being developed, Oak Grove became the twelfth and most
recent addition to the LTRWC. Although the city had planned to build a new treatment plant for its current
source, it recognized that the source was inadequate. As a result, Oak Grove decided to join the LTRWC in
order to meet its water needs more effectively.

BENEFITS OF THE PARTNERSHIP
The Joint Powers Agency created by the 12 systems created a mechanism for building operational and
managerial efficiencies. Specific benefits are presented below.
 Technical
      Higher quality/quantity source water: The LTRWC serves its customers water from the Cumberland River in Clarksville.
      Tennessee, which is a higher quality and more sustainable water source.	
      Shared infrastructure: The LTRWC installed an 85-mile transmission line to provide its customers with an ample, high-
      quality supply.	
      Better treatment technologies: The LTRWC built and operates a state-of-the-art nitration plant that uses membrane
      micro-filtration after conventional pre-treatment.	
 Managerial
      Efficiency: The partnership eliminates the unnecessary duplication of services and provides for a more efficient use of
  ^7
      resources.
      Efficiency: The LTRWC now relies on a single large water source instead of nine smaller and lower quality sources as its
      members did in the past. This situation allows each system to focus more on distribution instead of treatment.	
      Retaining local control: Each distribution system addresses unique local issues (and bears the burden of solving local
      problems), including how to decommission unneeded treatment plants, and how to retire any remaining debt on those
      facilities.
 Financial
      Economies of scale: The LTRWC has decreased long-term average costs associated with purchasing supplies, contracting/
      allocating resources to construction, and creating operational improvements.	
      Reduced long-term costs: Each partner distribution system pays the same wholesale rate for water regardless of size or
      location. This arrangement reduces predicted future water costs compared to other alternatives.
LESSONS LEARNED
The success of the LTRWC was driven by local initiative and involvement. It would not have started had several
water systems failed to realize they shared common goals and then found a way to develop a common solution.
The local efforts were supported by state water officials, as well as by top elected officials, and their support led to
innovative funding strategies that helped make the project a reality. The LTRWC could not have been possible
without a broad coalition of partners, including the 12 communities that benefited from the successful outcome.
                                                                                                               13

-------
                                    Canyon Regional Water Authority,  Texas
   The Canyon Regional Water Authority (CRWA) is a Joint Powers
   Agency composed of 11 water systems in south-central Texas. The
   CRWA serves over 135,000 persons in an area covering 618 square
   miles. The partner systems are municipal and regional systems under
   both public and private ownership. The partnership has helped
   the systems limit unsustainable aquifer withdrawals by developing
   alternative water sources, purchasing water in bulk, and planning for
   long-term sustainability.

   FACTORS LEADING TO THE PARTNERSHIP
   The overriding challenge facing the area before the partnership was the over-pumping of the Edwards Aquifer.
   Systems in the area were withdrawing water faster than the aquifer was being recharged. As a result, withdrawals
   needed to be limited and alternative sources of water needed to be developed for consumers not directly over the
   aquifer.

   KEY PLAYERS AND DRIVERS
   The state, through the Texas Water Development Board, was the
   driving force behind the development of the CRWA. Responding to
   the unsustainable use of the aquifer, the Texas Water Development
   Board and the Edwards Underground Water District pushed the state
   legislature to form an entity that would help manage the regional
   resource.  In 1989, the state legislature formed the CRWA.

   Besides pushing for the formation of the CRWA, the Texas Water
   Development Board  has helped finance projects in the area. Upon the
   CRWAs creation, the Texas Water Development Board awarded the
   system a  50 percent matching fund grant to develop a regional plan
   to adequately supply the area in the future and to focus on alternative
   water sources outside the Edwards Aquifer. In 2000, the Texas Water
   Development Board  approved a $10 million loan from the Texas Water
   Development Fund to help CRWA improve its distribution system.
Partnership Snapshot
Joint Powers Agency with
Interconnection
CRWA is responsible for acquiring.
treating, and distributing drinking water
for the six partner systems.
Timeline
1989: CRWA was created by the state
     legislature
2000: CRWA received a loan to improve
     its distribution system
14

-------
Gaining Operational and Managerial Efficiencies Through Water System Partnerships: CASE STUDIES
BENEFITS OF THE  PARTNERSHIP
The Joint Powers Agency created a mechanism for building operational and managerial efficiencies in the 11
systems in the area over the aquifer. Specific benefits are presented below.
 Technical
   ~  Shared infrastructure: CRWA operates the Lake Dunlap Water Treatment Plant (16.4 MOD) and the Hays/Caldwell Water
      Treatment Plant on the San Marcos River (6 MGD).
      Shared infrastructure: CRWA operates 37 miles of transmission mains, 4.0 and 3.0 MG ground storage tanks, a booster
      pump station, as well as 1.5 MG and 2.0 MG elevated storage tanks.
 Managerial
      Expertise: CRWA maintains a larger staff and has more expertise than the independent systems did. Consequently, the
      CRWA can offer better customer service, manage assets more effectively, and plan for the future.
 Financial
      Economies of scale: CRWA is working with its members to acquire future water rights from groundwater and surface
      water in the Cibolo, Guadalupe, San Antonio and San Marcos river basins. CRWA is also working with its members to
      develop a well field in the Carrizo/Wilcox Aquifer in Gonzales and Guadalupe counties.
      Economies of scale (bulk purchasing): CRWA is a major purchaser of raw water stored by the Guadalupe Blanco River
      Authority at Canyon Lake, which CRWA diverts to Lake Dunlap for treatment. CRWA also purchases water from Springs Hill
      Water Supply Corporation.
Another benefit of the partnership is a shift to sustainable water management. CRWA is mandated to
encourage water conservation, reduce reliance on an uncertain future supply of groundwater, and protect,
preserve, and restore the purity of water in the area. CRWA takes a watershed approach to water management
in the area, and it helps limit withdrawals from the Edwards Aquifer to promote its sustainable use, which is
especially important during droughts.

LESSONS LEARNED
State-driven efforts can lead to a sustainable use of a common resource. Using its authority, the state was able to
bring together the relevant systems and create a mechanism that has helped systems in the area provide high-
quality water in the short run and plan for the long run. This type of regional management may not have  been
achievable by the independent systems alone.
                                                                                                             15

-------
                                            Ellsworth Estates Water Company /
                           The Connecticut Water Company, Connecticut
                                                                       Connecticut Water Company Service Area Map
The Ellsworth Estates Water Company was a small privately-owned groundwater system serving 82 homes
in north-central Connecticut. The system transferred its ownership to
the Connecticut Water Company (CWC) as part of a state-mandated
process in which it was first operated as  a satellite system and later
connected to CWC. The ownership transfer helped Ellsworth overcome
its lack of managerial capacity and improved its water quality through
the interconnection.

FACTORS LEADING TO THE  PARTNERSHIP
Prior to transferring its ownership to the CWC, Ellsworth was
confronted with several managerial and technical issues. The greatest
challenge was a lack of managerial capacity stemming from the loss of
one of the two owner/operators in 1991.  The remaining elderly owner
notified the State of Connecticut that he was unable to run the system
on his own and petitioned the State for a transfer of ownership. A closer examination of the system by the state
revealed old and undersized piping, pressure switches, tanks, and booster and well pumps. The system also lacked
an air compressor or air control, blow-off valves,  meters, hydrants, and standby power equipment. The system's
pressure tanks were also water logged. As a whole, the system suffered from inadequate volume and pressure,
and the wells had never been yield tested. Because the system failed to provide adequate water pressure to its
customers, it was in violation of state regulations.

KEY PLAYERS AND DRIVERS
The State of Connecticut was the key driving force behind the ownership transfer and resulting satellite
management. In the 1980s, Connecticut developed a comprehensive approach to compel troubled small
systems to consolidate with larger well run systems. The state also adopted regulations to ensure that any new
small  systems being developed were done so in accordance with strict guidelines, in an effort to enhance their
long-term viability. To address the Ellsworth situation, representatives of the two relevant state agencies—the
Department of Public Health (DPH) and the Department of Public Utility Control (DPUC)—formed the
"authority" responsible for determining what water company or
municipal system was best suited to acquire Ellsworth. By law, the
authority was required to consider the technical, managerial, and
financial capacity of the acquiring system. The authority was also
required to consider rate differences and the impact of rate changes.
                                                                     Partnership Snapsho
   The state authority determined that the acquiring system would need to
   address the low pressure problem at Ellsworth and make improvements
   needed due to the age of the system. In addition, the acquiring
   system needed to have the capacity to provide for future growth in
   the area. The state authority chose the CWC to acquire Ellsworth as
   a satellite system from among five water systems because the CWC
   met the outlined criteria, including being in close proximity to the
   Ellsworth system and having the financial capacity to make necessary
   improvements.
                                                                     Ownership Transfer with Interconnection
The State of Connecticut mandated the
ownership transfer. CWC first operated
Ellsworth as a satellite system, but later
interconnected with the system because
of water quality problems.
                                                                  Timeline
                                                                  1991:  One of two system owner/operators
                                                                       is lost
                                                                  1993:  Ownership transferred to CWC
                                                                  1994:  Ellsworth interconnected to CWC
16

-------
Gaining Operational and Managerial Efficiencies Through Water System Partnerships: CASE STUDIES
After the ownership transfer in 1993, the CWC ran the Ellsworth system as a satellite. However, the next year
the CWC detected nitrate levels nearing the MCL in one of Ellsworth's wells. Since the distribution system did
not ensure adequate dilution, CWC took the well offline as a precaution. Because of this water quality problem,
the CWC requested and received state approval for the interconnection.

BENEFITS  OF THE  PARTNERSHIP
The state-mandated ownership transfer created a mechanism for building operational  and managerial
efficiencies at Ellsworth. Specific benefits are presented below.
      Shared infrastructure: After initially running Ellsworth as a satellite system, the CWC built a 6,400-foot interconnection
      to Ellsworth from the CWC's northern region. That region had an average daily demand of 10.0 MOD and a total supply of
      15.25 MGD, which left a sufficient surplus for Ellsworth and for future growth.
      Trained and certified operators: With more than 30 highly trained and certified operators, the CWC had the technical
      personnel to take over and operate Ellsworth as soon as ownership was transferred.
 Managerial
      Expertise: The CWC has the technical and managerial expertise to ensure reliable and efficient service to current Ellsworth
      customers and enough staff capacity to serve additional customers in the future.	
 Financial
      Better access to funds: The CWC was chosen because it had the financial resources to make all of the necessary
      improvements to Ellsworth.	
      Reduced costs: Ellsworth's customers paid an average of $31 per quarter prior to the partnership. If the 82 Ellsworth
      customers were required to bear the cost of the necessary capital improvements alone, their water bills would have
      risen to an average of $250 per quarter. After the consolidation, the Ellsworth customers paid the existing CWC rate of
      approximately $80 per quarter.	
      Economies of scale: After the consolidation, costs for the interconnection and upgrades were spread over a larger
      consumer base. The rate increase needed to pay for the improvements was applied to all 59,540 CWC customers as well as
      to the customers of the former Ellsworth Estates Water Company.	
      Economies of scale: The CWC also reduced costs associated with operating Ellsworth by connecting the satellite to the
      main system. The CWC received an engineering bid of $272,000 for the interconnection, compared with the estimated
      cost of capital improvements for running Ellsworth as a satellite system of between $290,000 and $416,000, depending
      on treatment needs. In addition, the annual cost of operating Ellsworth as a satellite system could have reached $81,000.
      while the annual cost of maintaining the interconnection was approximately $1,011.
LESSONS  LEARNED
The success of Ellsworth/CWC shows that state-led ownership transfers can benefit all parties. CWC gained
customers through the ownership transfer and expanded its service area with the interconnection. Ellsworth
customers now receive safe drinking water at a reasonable cost, and the owner of the Ellsworth system was
able to retire. This was possible because of the state's approach and its legal framework, which facilitated a
straightforward solution.
                                                                                                                  17

-------
                                       White  Sand Beach Water Company, Inc./
                            The Connecticut Water  Company, Connecticut
   The White Sand Beach Water Company (WSBWC) was a small,
   privately owned water system serving 148 seasonal customers in
   south-central Connecticut. The Connecticut Water Company
   (CWC) is the second-largest investor-owned water system
   in Connecticut, currently serving over 286,000 persons in 41
   communities. The ownership transfer and interconnection of the
   WSBWC to the CWC helped the WSBWC overcome water
   shortages and financial limitations by linking to a system with
   greater production capacity and by increasing rates to more
   accurately reflect the cost of providing safe, reliable water.

   FACTORS  LEADING  TO A PARTNERSHIP
Connecticut Water Company Service Area Map
   Before ownership was transferred, the WSBWC faced several technical problems related to water quality and
   quantity. Water pressure throughout the system depended to a great extent on the number of users. During
   periods of peak consumption, especially around the Fourth of July holiday, WSBWC customers experienced
   pressure problems. WSBWC customers were sometimes exposed to health risks associated with high sodium
   levels, nitrates, and possible contamination from saltwater intrusion and the proximity of supply wells to nearby
   septic systems. Although the WSBWC had long maintained a positive revenue stream, system maintenance
   and upgrades had historically been deferred and as a consequence the system generally failed to meet current
   standards designed to protect public health.
   KEY PLAYERS AND DRIVERS
   The WSBWC determined that the best way to solve its technical and
   financial problems was for it to be sold to a large system. The CWC
   operated the nearby Sound View Water System as a satellite system
   and was interested in acquiring the WSBWC. In 2000, the companies
   jointly approached the state and received approval for the sale and
   interconnection of the WSBWC to the CWC.
                                                                    Partnership Snapshot
Interconnection to a Satellite System
Confronted with technical and financial
challenges, WSBWC sold itself to CWC.
Timeline
2000: The state approved the sale and
     interconnection
18

-------
Gaining Operational and Managerial Efficiencies Through Water System Partnerships:  CASE STUDIES
BE>
Thes
WSB
BEFITS OF THE PARTNERSHIP
,ale and interconnection to the CWC satellite system built operational and managerial efficiencies at the
WC. Specific benefits are presented below.

Technical
-/
-7
Shared infrastructure: After the sale, the CWC completed a $412,000 infrastructure improvement project
and installed 7,800 feet of 8-inch main to connect the WSB WC to the CWC satellite system.
High quality /quantity water: Customers now have access to a safe and adequate water supply in addition
to improved fire protection services along the new main, which ensures the community's safety.
Managerial
-/
Expertise: The CWC offers 24-hour customer service, possesses an inventory of repair and replacement
parts, and staffs knowledgeable and experienced engineers, activities that were beyond the capacity of the
independent system.
Financial
V
Access to funds: The CWC has the financial and managerial resources necessary to implement a capital
improvement program to meet growing demand and ensure future regulatory compliance.

Another benefit of the partnership is a shift to sustainable water management by bringing the former WSBWC
system closer to achieving full-cost pricing. Prior to the transfer in ownership, customers of the WSBWC were
paying $109.44 a year for water service between April and November. With the consolidation, customers' rates
were raised to $302.61 a year for seasonal use. The rate hike was necessary to ensure a continued safe supply of
water, complete necessary infrastructure improvements, and provide WSBWC customers with increased service.

LESSONS LEARNED
Interconnecting to a larger satellite system overcame the challenge faced by a system that was too small to
effectively address its water quality and infrastructure issues.  The ownership transfer has helped spread the cost
of making improvements to the system.
                                                                                                       19

-------
                                                        Prairieton Water Company/
                                Indiana American Water Company, Indiana
   The Prairieton Water Company was a small private water system serving 675 persons
   in western Indiana. The Indiana American Water Company (IAWC) is privately owned
   and serves over 700,000 persons in 35 cities and towns across the state. The ownership
   transfer and interconnection of Prairieton to IAWC helped overcome Praireton's water
   quality problems by linking to a system that has greater production capacity and a
   higher quality water source.

   FACTORS LEADING  TO THE PARTNERSHIP
   Before the interconnection with IAWC, Prairieton was challenged by diminishing
   source water quality. Routine monitoring between 1997 and 2000 found nitrate levels in
   excess of the Maximum  Contaminant Level. The system received citations for each of
   these violations, but did  not have the financial capacity to address the issue.

   KEY PLAYERS AND DRIVERS
   The State of Indiana played a key role in the interconnection and ownership transfer. In an effort to overcome
   the technical challenge and financial shortcomings at Prairieton, the state helped facilitate discussions between
   the system and the IAWC. Prairieton and the IAWC eventually agreed on the transfer of ownership and on
   plans to interconnect and retire the old, low-quality well field.
   The state helped fund the interconnection with a $500,000 Drinking
   Water State Revolving Fund (DWSRF) loan, the first time DWSRF
   funds had been issued to a private water company. Prairieton qualified
   for the lowest available loan rate, 2.9 percent, because its median
   household income was only $11,973. With the loan, Prairieton was able
   to abandon its plant and connect to the IAWC.
Partnership Snapshot
Ownership Transfer with Interconnection
Ownership of Prairieton was transferred
to IAWC and the systems were
interconnected.
                                                                    Timeline
                                                                    1999: Prairieton violates Nitrate Rule
                                                                    2000: Prairieton, IAWC, and the state
                                                                         work out an agreement
                                                                    2001: Ownership transfer and
                                                                    	interconnection complete	
20

-------
Gaining Operational and Managerial Efficiencies Through Water System Partnerships: CASE STUDIES
BENEFITS OF THE  PARTNERSHIP
The ownership transfer created a mechanism for the systems to build operational and managerial efficiencies.
Specific benefits are listed in the box below.
 ItSBmH
 Technical
      New infrastructure :The IAWC spent $961,205 to construct a pipeline and connect to the Prairieton system.
      Improved infrastructure: Since the ownership transfer, the IAWC has replaced miles of water mains and installed meters
      at each customer connection.
      High quality water source: The IAWC delivers high-quality drinking water not otherwise available to Prairieton customers.
 Managerial
      Expertise: The IAWC offers a level of managerial expertise that ensures more reliable and more efficient service to
      customers in the area.
 Financial
      Economies of scale: Prairieton customers were able to reduce long-term average costs by interconnecting to a larger
      system, instead of developing and maintaining their own water supply.
      Reduced cost: The IAWC was able to increase its customer base along the transmission line at reduced cost because of the
      infrastructure built for the Prairieton interconnection.
Another benefit of the partnership is a shift toward full-cost pricing. The transfer in ownership created an
opportunity to install water meters and change the rate structure. Before the interconnection, customers paid a
flat fee for water. With water meters installed, the IAWC was able to charge customers based on use. Although
the rates for Prairieton customers did rise, especially for high-volume water users, the rates now more accurately
reflect the cost of providing high-quality water to the area. This shift toward full-cost pricing helped customers
see how they were using water and created an incentive for them to use water more efficiently.

LESSONS  LEARNED
The success of the Prairieton interconnection rests in large part with the state. Ultimately the interconnection
was the most cost-effective method for improving water quality. Through the state's facilitation of the
discussions between the system and the IAWC and its financial support in the form  of the DWSRF loan, the
interconnection and ownership transfer where successfully completed and resulted in public health benefits for
customers in the area.
                                                                                                             21

-------
                   Mountain Regional Water Special Service District, Utah
   The Mountain Regional Water Special Service District (MRWSSD) is an
   example of ownership transfer with interconnection, or regionalization, in
   northeastern Utah. The MRWSSD is made up of more than 12 systems
   serving nearly 4,000 connections over most of Summit County. The
   systems were owned by a combination of entities. Some of the systems were
   small private companies set up by a housing developer to serve individual
   developments, two of the systems were public, and two were large private
   systems. The partnership has helped the systems improve water quality, reduce
   shortages, and improve management by building redundancy into a shared
   regional system and employing a team of trained and certified operators.

   FACTORS LEADING TO  THE PARTNERSHIP
   Before the MRWSSD was formed in 2000, the systems faced significant
   management and technical challenges. Many of the small systems had histories
   of litigation over shared water resources and competition in common service
   areas. Many of the water quality and quantity issues facing the systems stemmed from housing development
   patterns. To make new developments feasible, developers needed access to a water source. Frequently, the
   developer-established sources were wells drilled into shallow bedrock aquifers, not the high-capacity alluvial
   aquifers found in the region. As a result, both water quantity and quality diminished over time. Many of these
   small systems were also understaffed and could afford only one part-time employee.

   KEY PLAYERS  AND DRIVERS
   The State of Utah was one  of the key  drivers leading to the formation of the MRWSSD. The state's Regional
   Management Plan initiative led the development of regional plans, which were authorized by planning
   committees composed of local volunteers who were recruited by a regional coordinator. Consultants helped
   the regions analyze the technical and financial capacity of existing water systems, and helped the committees
   prepare the regional plans that discussed the prospects for sharing equipment, operators, managers, and facilities
   among water systems. Systems were able to comment on  the draft regional plan, and their comments were
   incorporated into the final regional management plan. The MRWSSD is a product of this state effort to establish
   regional plans.

   The MRWSSD was established with three goals focused on correcting the technical and managerial problems
   affecting the systems. The first goal was to fix water problems in the western side of Summit County by
   regionalizing the small and struggling water systems into the
   MRWSSD and using  economies of scale to improve the long-term
   level of service in the area. The second and third goals were to help the
   systems in the area import water, and to organize water conservation
   efforts.
Partnership Snapshot
   Two individuals also stood out as key players in the formation of the
   MRWSSD by acting as local champions of the effort. As a product of their
   efforts, Marti Gee and Doug Evans were asked by the Summit County
   Commissioners to leave their existing jobs and assist Summit County in the
   regionalization of the western side of the county. Both continue their efforts
   today as parts of the MRWSSD management team.
Ownership Transfer with Interconnection
MRWSSD combined more than 12 small
systems to utilize economies of scale and
improve the long term level of service in
the area.
Timeline
1998: Regional Management Plan is
     developed
2000: MRWSSD is formed
22

-------
Gaining Operational and Managerial Efficiencies Through Water System Partnerships: CASE STUDIES
BENEFITS OF THE PARTNERSHIP
The Special Services District created through the annexation of the 12 systems provided a mechanism for
building operational and managerial efficiencies. Specific benefits are presented below.
 Technical
      Shared Infrastructure: Because water varies seasonally and spatially, the District provides for more redundancy of water
      source, storage, and distribution elements. When systems have shortages/problems, adjoining or interconnected partners
      can make up the shortfall. The interconnections enable each system to continue providing safe water and fire protection
      and to protect against events that it could not have in the past. The flows to and among systems are managed by a
      computer control system that monitors the entire basin and delivers the right amount of water, at the right time.	
      Higher quality water: The district is a more viable public entity and can more easily meet current and future EPA and state
      rules and regulations that the small, independent systems could not.	
 Managerial
      Expertise: Small water systems that could only employ one operator at most now have the full resources of the MRWSSD,
      which grew from one employee in 1999 to 14 in 2001.	
      Expertise: All of the District's operators and management staff have extensive training. Mountain Regional's operational
      crews more effectively repair leaks and make major repairs than could the independent systems.	
      Expertise: The District's operators and management together have over 130 years of combined water experience.
 Financial
   f  Access to funds: The District created a mechanism to pool resources and share the cost of initiating a major water
      importation project.	
      Economies of scale: It is easier and more cost effective to manage a pool of assets as a whole instead of at a smaller scale.
      (MRWSSD operates 26 wells and springs,  19 large storage reservoirs, pumping and disinfection stations, and hundreds of
      miles of pipelines.)
Another benefit of the partnership is a shift to sustainable water management. A larger regional project and
strategy were the only way to manage water sustainability and make infrastructure investments of real value.
Although state and federal funding agencies were funding water improvements of nearly $15 million to as many
as 10 small private and public systems prior to the formation of the
MRWSSD, source improvements still could not provide the needed
capacity to individual systems. Under the MRWSSD, projects are
scaled to make all investments count.

LESSONS LEARNED
The success of the MRWSSD was driven by a state regionalization effort
and local champions who helped lead the effort. The State Regional
Management Plan Initiative provided a framework for local systems                   summit county, Utah
to see where there was potential for building capacity by forming
partnerships. Together, these two factors brought systems together in
the MRWSSD. Developers are only responsible for providing water to a development, but such a narrow focus
can often limit a community's ability to find, secure, and maintain  sustainable sources of water. Sustainable water
management only started to become a reality with the formation of the regionally focused MRWSSD.
                                                                                                              23

-------
                   Possum Kingdom Water  Supply  Corporation,  Texas
   The Possum Kingdom Water Supply Corporation (PKWSC) is a
   consolidation of more than 60 small, privately owned community and
   non-community water systems in north-central Texas, approximately
   90 miles west of Dallas-Fort Worth. The PKWSC serves over 1,900
   connections in this popular vacation area. This full consolidation, with
   ownership transfers and interconnection of all the partner systems, has
   helped address water quality issues in the area by pooling resources for a
   shared treatment plant and distribution system.

   FACTORS LEADING TO  THE PARTNERSHIP

   Before the partnership was formed, area water systems faced several
   technical and compliance issues. These small systems included trailer
   camps and individual restaurants spread across the region. Many of the
   systems drew water from a surface reservoir that had high levels of total dissolved solids, but the systems did
   not adequately address this issue. Most systems treated their water with small pressure filtration systems and
   chlorination, despite state regulations that require coagulation and flocculation be used to treat surface water as
   well. As a result, the systems were in violation of current regulations.

   KEY PLAYERS  AND DRIVERS
   The state helped initiate the formation of the PKWSC by focusing attention on the local systems' water
   problems. Recognizing their common shortcomings, the small systems teamed together to form the PKWSC
   and create a water system they could share. Through this effort, the non-
   compliant systems were consolidated, and effectively replaced by a single
   regional distribution system.
Partnership Snapslu
   State and federal funding sources helped make the PKWSC treatment
   and distribution project a reality. In 1998, the PKWSC received $6.5
   million in U.S. Department of Agriculture (USD A) Rural Development
   funds and $4.7 million from the Drinking Water State Revolving
   Fund (DWSRF). Together, these loans helped finance the new water
   treatment plant and the first three phases of interconnections between
   systems. In 2005, the fourth interconnection phase was funded by
   another $1.7 million loan and $900 thousand grant from USDA. The
   interconnections were completed in 2006.

   In 2006, the Texas Water Development Board authorized a $1.6 million
   DWSRF loan to help finance additional improvements to the PKWSC
   system. Although construction is yet to begin, the PKWSC will use the
   loan to expand water treatment capacity, purchase support equipment,
   and extend service to a housing development and a state park.
Ownership Transfer with
Interconnection
Over 60 non-compliant systems were
consolidated into PKWSC and supplied
water from the single distribution system.
Timeline
1992: PKWSC was formed
1998: PKWSC secures federal and state
     funding for a new treatment plant
     and interconnection
2005: PKWSC secures funding for
     additional interconnections
2006: PKWSC secures state funding
     for additional treatment and
	continued expansion	
24

-------
Gaining Operational and Managerial Efficiencies Through Water System Partnerships:  CASE STUDIES
BENEFITS OF THE PARTNERSHIP
Consolidating the systems was an effective mechanism for building operational and managerial efficiencies in
the area. Specific benefits are presented below.

Technical
v
v^
Shared infrastructure: The PKWSC maintains a 1.0 MOD surface water treatment plant and more than 325 miles of
distribution pipe. The treatment plant consists of two modular water treatment trains containing 0.5 MOD reverse osmosis
units each. The third module will soon be added so the plant will operate at almost 90 percent capacity.
Quality and Quantity: PKWSC customers now have access to a safe and reliable water supply.
Managerial
V
Expertise: The PKWSC maintains a larger staff and has more expertise than the independent systems. This situation
enables the PKWSC to offer better customer service, manage assets more effectively, and plan for the future.
Financial
,/
Economies of scale: With greater purchasing power than the individuals systems had, the PKWSC has decreased
term average costs associated with treatment and distribution by pooling financial and technical resources.
long-
Another benefit of the partnership is a significant gain in public health
protection. In 2006, the PKWSC was awarded the DWSRF Award for
Sustainable Public Health Protection because of its significant technical
improvements that give area residents safe, high-quality drinking water.

LESSONS  LEARNED
A realization that many small systems in the area were non-compliant
and too small to effectively address water quality issues made the
PKWSC possible. The consolidation has helped pool financial resources
and spread the cost of installing state-of-the art technology. This  resulted
in a cost-effective solution to water quality issues in the area. State and
federal funding sources were also critical to getting the project started.
                                                                      Steel Standpipe at Possum Kingdom Water Supply
                                                                                 Corporation
                                                                                                        25

-------
    ACKNOWLEDGEMENTS

    EPA would like to thank the representatives of the featured systems for their valuable assistance in developing these case studies.
    CONTACT INFORMATION

    The following system representatives have graciously provided their contact information for readers who would like more infor-
    mation about their system's partnership approaches and experiences.
    NORTHEAST/MERRIMACK VALLEY CONSORTIUM OF WATER AND
    WASTEWATER FACILITIES, MASSACHUSETTS

    Lewis Zediana
    (978) 858-0345
    lzediana@town.tewksbury.ma.us

    CITY OF PANORA, IOWA

    Brent Christofferson
    (641)755-2188
    bchristofferson@netins.net

    TRIPP COUNTY WATER USER DISTRICT, SOUTH DAKOTA

    Russ Phillips
    (605) 842-2755
    tcwud@gwtc.net

    LOGAN-TODD REGIONAL WATER COMMISSION, KENTUCKY

    Brent H. Traughber, P. E.
    (270) 483-6990
    ltrwc@mchsi.com

    CANYON REGIONAL WATER AUTHORITY, TEXAS

    Charlie Powell
    (830) 609-0543
    powell@crwa. com
THE CONNECTICUT WATER COMPANY, CONNECTICUT

David Radka
(860)669-8630
dradka@ctwater.com

PRAIRIETON WATER SYSTEM/INDIANA AMERICAN WATER

Chuck Adamson
(812)232-7369 x 227
Chuck.Adamson@amwater.com

MOUNTAIN REGIONAL WATER SPECIAL SERVICE DISTRICT, UTAH

Marti Gee
(435)940-1916x302
mgee@mtregional. org

POSSUM KINGDOM WATER SUPPLY CORPORATION, TEXAS

Sue Cathey
(940)779-3100
sue@pkwsc. com
    FURTHER INFORMATION

    For additional information:

    Call the Safe Drinking Water Hotline at 1-800-426-4791

    Visit the EPA website at www.epa.gov/safewater
26

-------
This page is intentionally left blank.


-------
Office of Water (4606M)
EPA816-R-09-005
May 2009
www.epa.gov/safewater

-------