United States
      Environmental Protection
      Agency
Total Maximum Daily  Loads
THSDLs
   TMDL at a Glance
   Diamond Lake TMDLs- pH and
   Dissolved Oxygen
   (approved April 2007)
   www.deq.state.or.us/wq/tmdh/umpqua.htm
   Factors causing impairment
   Aesthetics, fishing, and water contact recreation
   designated uses impaired due to elevated pH levels
   and reduced dissolved oxygen levels from excessive
   algal blooms
Restoring  Diamond  Lake's Water Quality and  Trout

Fishery Through Invasive Species  Removal and

Education

The introduction of rainbow trout to the naturally fishless Diamond Lake attracted both
wanted and unwanted visitors, resulting in significant changes to the health of the lake
      and lake-based recreational tourism. As Oregon Fish and Game officials stocked
      the lake with rainbow trout in the early 1900s, Diamond Lake grew in popularity
      as a fishing destination. Unfortunately, fishing enthusiasts brought an invasive fish
      species, the tui chub, to use as live trout bait. (Live bait is illegal in Oregon.) Over
      time, the exploding tui chub population not only took its toll on the rainbow trout
      fishery, but also on the overall water quality of the lake. The tui chub fed on larger
      herbivorous zooplankton—the microscopic organisms in the lake responsible
      for controlling algae growth—throwing the lake's nutrient cycling processes
      off balance. As a result, Diamond Lake suffered from excessive growth of toxic
      algae blooms that increased pH levels and reduced dissolved oxygen (DO) levels.
      Diamond Lake could no longer support its aquatic life designated use and was
      often closed for recreation during summer months due to potential health risks.
   Sources contributing to impairment
   Introduction of the tui chub, an invasive fish species,
   resulting in the removal of native aquatic organisms
   that typically control algae growth
   Restoration options
   Tui chub removal and educational efforts to prevent
   introduction of invasive species
   Stakeholder involvement
   Umpqua National Forest, Oregon Department of Fish
   and Wildlife, Oregon Department of Environmental
   Quality, Partners for Umpqua Watersheds, Oregon
   Wildlife Heritage Foundation, Oregon Division of
   State Lands, Oregon Department of Agriculture,
   Douglas County, PacifiCorp, watershed residents,
   local businesses, and several other state and federal
   agencies
   Status of waternody
   Restoration of aquatic life designated use after removal
   of tui chub; anticipated attainment of other water
   quality standards with potential delisting by 2010
   Benefits to stakeholders
   Improved water quality, recreational opportunities
   (fishing, boating, and swimming), and lake aesthetics,
   as well as increased tourism
      The Oregon Department of Environmental Quality (ODEQ) initiated the
      development of a TMDL to help Diamond Lake restore its aquatic life designated
      use. The TMDL analysis predicted that removing the tui chub from Diamond Lake
      would restore the lake's nutrient cycling processes and support the aquatic life
      designated use. Based on the TMDL recommendations, multiple stakeholders from
      the federal, state, and local levels collaborated to develop and implement a plan
      to remove the tui chub and restore the trout fishery. The biology and chemistry of
      Diamond Lake have shown significant improvement due to the removal of the tui
      chub. As a result, Diamond Lake is now both fishable and swimmable. Currently,
      Diamond Lake is meeting Oregon's water quality standards and ODEQ expects
      to remove Diamond Lake from the state's list of impaired waters in the next
      assessment cycle  in 2010.


      How are TMDLs at work in Diamond Lake?

      Through the technical analysis, the Diamond Lake pH and DO TMDL provided
      stakeholders with a clearer understanding of the external and internal loads of
      nutrients affecting the levels of pH, DO, and algal blooms in the lake. The findings
      of the analysis, conducted using a computer model tailored to Diamond Lake,
      illustrated the relative contributions of nutrients from streams flowing into the
      lake and human activity in the watershed (i.e., external loads) versus the lake's
      nutrient cycling processes (i.e., internal sources). The final TMDL report provided
                                             What is a total  maximum daily load  (TMDL)?
                                             It is a study or analysis that calculates the maximum amount of a pollutant that a waterbody can receive and still meet
                                             water quality standards. The TMDL establishes a pollutant budget and then allocates portions of the overall budget to
                                             the pollutant's sources. For more information on TMDLs, visit EPA's website at www.epa.gov/owow/tmdl.

-------
                                      an explanation of how changes to the biological community found in Diamond Lake due
                                      to the tui chub population changed how efficiently the lake cycled nutrients, resulting in
                                      excessive algal blooms. The model used in the TMDL analysis estimated the percentage
                                      of tui chub that stakeholders would need to remove from the lake to improve the lake's
                                      nutrient cycling and restore water quality. In addition, the TMDL analysis revealed
                                      that changes in trout stocking densities would also be necessary to attain water quality
                                      standards.

                                      Who were the participating stakeholders and key partners?
                                      Development of TMDLs in the state of Oregon is the responsibility of the Oregon
                                      Department of Environmental Quality (ODEQ). To develop the pH and DO TMDLs
                                      for Diamond Lake, ODEQ worked with key stakeholders and partners at the federal,
                                      state, and local levels. TMDL implementation, unlike TMDL development, is in the
                                      hands of other stakeholders and partners,  depending on the actions recommended by
                                      the TMDL. In the case of Diamond Lake, the U.S. Forest Service staff from the Umpqua
                                      National Forest and the Oregon Department of Fish and Wildlife (ODFW) led the
                                      effort to remove the tui chub  from Diamond Lake. Local stakeholders that participated
                                      in implementation activities,  as well as participated in TMDL development, included
                                      watershed residents, city and  county agencies and officials, members of local watershed
                                      groups and environmental organizations, as well as businesses with a local presence. Key
                                      state partners, in addition to ODEQ and ODFW, included the Oregon Division of State
                                      Lands, Oregon Department of Agriculture, and the Oregon Department of Forestry. The
                                      U.S. Environmental Protection Agency (EPA)  is a key federal partner involved in both
                                      reviewing and approving the  pH and DO TMDL for Diamond Lake, as  well as a funding
                                      partner providing resources to support implementation.

                                      How did stakeholders participate in the TMDL process?
                                      The overall TMDL process includes the following elements: section 303(d) listing
                                      decisions, TMDL development, and TMDL implementation. Each element of the TMDL
                                      process provided stakeholders with an opportunity to express concerns and share
                                      information about the water quality problems in the Diamond Lake with ODEQ and other
                                      key partners. A description of each element of the TMDL process is provided below.

                                      Section 303(d) Listing Decisions
                                      If a waterbody does not meet water quality standards (i.e., numeric or narrative criteria)
                                      for one or more pollutants, it  goes on a state's 303(d) list. Impaired waterbodies on this
                                      list require a TMDL for each  pollutant contributing to the impairment. Stakeholders have
                                      the opportunity to provide input during the 303(d) listing process. The  Umpqua National
                                      Forest, administered by the U.S. Forest Service, is the designated land management
                                      agency for the properties surrounding Diamond Lake. Staff from the  Umpqua National
                                      Forest support water quality studies on Diamond Lake. Data collected through these
                                      studies indicated water quality demonstrated  that Diamond Lake was not meeting water
                                      quality standards. ODEQ placed Diamond Lake on Oregon's 303(d) list in 1998 due to
                                      high pH and chlorophyll a levels  associated with excessive algal blooms during summer
                                      months. Diamond Lake also appeared on the 303 (d)  list in 2004 for the same listings, as
                                      well as low DO.

                                      TMDL Development
                                      In 2005, ODEQ initiated the development of the Diamond Lake TMDL to address the
                                      resident fish and aquatic life beneficial use impairments caused by excessive algal blooms,
                                      increased pH, and low DO levels that do not meet water quality standards. The Diamond
                                      Lake TMDL was a component of the overall TMDL  development process for the Umpqua
                                      Basin.
Diamond Lake-2

-------
One of the first steps in developing a TMDL is identifying an appropriate numeric
target associated with water quality standards—specifically, the water quality criteria
component of water quality standards. Diamond Lake did not meet the numeric water
quality criteria for pH and DO. In addition, Diamond Lake did not meet the narrative
water quality criteria for aquatic weeds and algae. As a result, ODEQ listed Diamond Lake
for all three parameters. Through the TMDL analysis, ODEQ had to identify a numeric
target that would take into account attainment of all three parameters. ODEQ discovered
through the TMDL development process that Diamond Lake would naturally exceed the
pH and aquatic weed water quality standards due to extended periods of above average
air temperatures and below average wind velocities. Therefore, ODEQ had to
take these factors into account when identifying an appropriate numeric target
for the TMDL. ODEQ selected a numeric target of 4,000 kg/yr of cyanobacteria
(blue-green algae) biomass for the TMDL. The final TMDL report states that this
target provides for the attainment of the pH, aquatic weed, and DO water quality
criteria.
Growth of algal blooms results from the excessive levels of nutrients—nitrogen
and phosphorus—and usually occurs during mid to late summer when factors
such as temperature and lake conditions promote production. As a result, the
TMDL analysis for Diamond Lake examined the various sources of nutrients
to determine the relative significance. Understanding the sources of nutrients
helped to understand the causes of water quality problems in the lake and
identify potential implementation strategies. Sources of nutrients to Diamond
Lake include both external and internal sources. External sources include
natural sources (i.e., nutrients from streams), septic tanks, fish stocking, and fish
bait. Of these external sources, the TMDL analysis showed nutrient loads from natural
sources to be the most significant. However, the analysis revealed that external sources
of nutrients were not the primary cause of Diamond Lake's water quality problem. The
problem stemmed from the internal loads of nutrients—the nutrients recycled within
the lake. Modification of the lake's biological communities by the invasive tui chub led
to modification of the lake's ability to efficiently recycle nutrients, causing excessive algal
blooms.
Using computer models, ODEQ simulated conditions in Diamond Lake, including daily
fluctuations in flow and water temperature, as well as biological interactions affecting
nutrient cycling in the lake. Results from the modeling analysis estimated a current peak
production of cyanobacteria biomass of 20,000 kg/year—five times greater than the
numeric target established through the TMDL to achieve water quality standards for pH,
algae, and DO.
The two sources of nutrients to Diamond Lake are external sources—streams,  septic
systems, fish stocking, and live bait—and internal loads. The TMDL report contains
nitrogen and phosphorus load allocations for these sources. On the basis of the modeling
analysis, achieving the numeric target for cyanobacteria in Diamond Lake would require
limiting nutrient loads from streams to current levels and reducing nutrient inputs
from fish bait, fish stocking and septic systems to 1975 levels. Internal nutrient loads
would also require a reduction to 50 percent of the 1975 internal load. The analysis
determined that achieving the load allocation  for the internal loads would require a
90-100 percent reduction in the tui chub population, as well as a reduction in the stocked
trout population. As a result, the TMDL report provides a secondary load allocation of
zero tui chub and 440,000 trout per year to achieve  the numeric target for cyanobacteria
established to attain water quality standards for pH, algae, and DO in Diamond Lake.
During TMDL development for the  Umpqua Basin (which includes Diamond Lake) in
2006, ODEQ asked the general public for comments on the proposed  TMDL report,
as well as the associated Water Quality Management Plan (WQMP). In addition to the
"Anyone working in recreation does it for the
satisfaction, not for the money, but it is our
livelihood. When your lake has a problem, you
get involved to find a solution. Getting involved
answered a lot of questions for us about the
area. We found a solution that had a huge
ripple effect both on the lake's ecosystem and on
our local economy."
                  —Rick Rockholts, Manager
                       Diamond Lake Resort
                                                                                                       Diamond Lake-3

-------
                                      60- day public comment period, ODEQ conducted four information sessions around the
                                      basin and held two formal public hearings. The TMDL report contains over 90 pages of
                                      public comments and responses from ODEQ.

                                      TMDL Implementation
                                      The final TMDL report acknowledges a multi-agency workgroup that developed a
                                      Diamond Lake Restoration Strategy, including a Final Environmental Impact Statement
                                      and a Record of Decision prepared by the Umpqua National Forest. As the designated
                                      land management agency, the Umpqua National Forest, is also the lead agency for
                                      implementing the Diamond Lake Restoration Strategy. The Diamond Lake Restoration
                                      Strategy presents implementation options to restore water quality in Diamond Lake, as
                                      well as enhance the recreational fishery. The implementation options contained in the
                                      Strategy focus on removal of the tui chub population, as recommended through the
                                      TMDL analysis.
                                      Implementation partners, led by the Umpqua National Forest and the Oregon Department
                                      of Fish and Wildlife (ODFW), initiated a process to restore the biological balance of Lake
                                      Diamond through the eradication of the tui chub and phased restocking of trout. In 2005,
                                      partners began reducing the lake water level by 50 percent to remove excess nutrients and
                                      decrease the amount of the chemical rotenone needed to kill the tui chub population.
                                      Prior to applying rotenone, project partners removed live tui chub using nets. In the fall of
                                      2006, partners added 100,000 pounds of rotenone to the lowered lake and then removed
                                      the tui chub carcasses. The process resulted in the removal of approximately 103,000
                                      pounds of tui chub—a population of approximately 98 million—from Diamond Lake.
                                      Trout restocking efforts by ODFW began in spring 2007 and have followed a conservative,
                                      phased approach as recommended by the TMDL. Goals for the restocking effort included
                                      avoiding high internal nutrient loading, minimizing pressure on zooplankton, and
                                      providing a fishery that would attract anglers back to Diamond Lake. In 2007, ODFW
                                      restocked Diamond Lake with approximately 184,000 fingerling and catchable-sized trout.
                                      The number of restocked trout grew to nearly 286,000 in 2008.  Both years the number
                                      of restocked trout were well below the target of 440,000 fingerlings recommended in the
                                      TMDL. In 2009, ODFW plans to stock 300,000—350,000 fingerlings.
                                      In addition to tui chub removal and trout restocking, the restoration project also includes
                                      an important educational component to prevent the reintroduction of invasive species to
                                      Lake Diamond by visiting recreational enthusiasts.
                                      The ODFW states that the overall treatment project costs approximately $6 million in
                                      federal, state, county, and private contributions. Financial support for implementation
                                      activities, including the water quality monitoring after the lake  drawdown and the
                                      rotenone application, were provided in part from Clean Water Act section 319 grant
                                      monies. Approximately $166,338 in section 319 funds and state matching funds supported
                                      implementation activities, as well as baseline monitoring for the TMDL analysis and
                                      database development. EPA also provided $15,378 of TMDL program funding to support
                                      TMDL monitoring.

                                      What is the  current status of Diamond Lake as a result of the
                                      TMDL process?
                                      Monitoring data collected in Diamond Lake after the removal of the tui chub demonstrate
                                      that the lake now supports its aquatic life designated use. To monitor the health of
                                      Diamond Lake after the removal of the tui  chub, ODFW assessed the lake in 2007 and
                                      compiled the 2008 Lake Conditions Index Report. This report uses metrics related to
                                      water chemistry and biology to measure changes in the lake's condition. The 2008 report
                                      states that Diamond Lake's pH  levels are near or below the 8.5 water quality criteria value
                                      and DO levels meet the water quality criteria appropriate for Diamond Lake on most days.
Diamond Lake-4

-------
Feb
In addition, the 2008 report states that chlorophyll a values decreased from a
high of 50 ug/L before the rotenone treatment to less than 10 ug/L (the numeric
water quality criterion associated with aquatic weeds and algae) after treatment.
Figure 1 illustrates the changes in chlorophyll a values in Diamond Lake before
and after tui chub removal.
Stocked trout health has also improved since the eradication of the tui chub,
according to ODFW assessment data. Before the removal of the tui chub,
stocked trout had a growth rate and a survival rate of nearly zero. During
the summer of 2007, stocked trout grew an average of two inches per month.
ODFW states that trout growth rates are now similar to the growth rates
observed in the 1970s and 1980s—the decades known as the hey days for
fishing in Diamond Lake.
Data from two years after tui chub eradication and trout restocking have shown
signs of water quality improvements in Diamond Lake. Benthic organisms, an
important food source for mature trout, increased from less than 25 pounds
per acre (Ibs/ac) in 2004—2006 to 200.6 Ibs/ac in 2007 and 168 Ibs/ac in 2008.
Before treatment of Diamond Lake in 2006, the bio-volume of cyanobacteria
was 24,407 cells per milliliter (cells/ml), or 25.7 percent of the bio-volume. Two years after
treatment of the lake, the bio-volume of cyanobacteria decreased to 49 cells/ml or 4.9
percent of the bio-volume. ODEQ will use this information and other required data inputs
to run the model used in the TMDL analysis to determine how these decreases translate
into annual cyanobacteria biomass (i.e., kg/yr) reductions—the numeric target established
in the TMDL. The pH of Diamond Lake also decreased from 8.5 to less than 7.8 during this
two year period.

How did local stakeholders benefit from the TMDL process?
Removal of the tui chub from Diamond Lake provided the lake's natural nutrient cycling
processes to regain its balance. As a result, both water quality and the lake's biological
communities showed improvement. It is anticipated that these improvements will lead to
Diamond Lake's removal from the state's list of impaired waters in 2010.
In addition to water quality benefits, the restoration  of Diamond Lake has benefitted
stakeholders in several ways. Additional benefits that followed the restoration of Diamond
Lake include:
O Decreased human health risks. Before treatment of Diamond Lake to remove the
   tui chub,  state officials closed the lake for recreation during summer months when the
   toxic blue-green algae dominated the lake. Blue-green algae blooms produce toxins
   that are harmful to humans and animals. After implementation, blue-green algae went
   from the dominant algae type in Diamond Lake to only a small percentage of the algal
   community.
O Revived tourism to boost local economy. Diamond Lake is a vital component of
   the state and local economy because of its world-renowned angling opportunities.
   Diamond Lake recreational enthusiasts contribute approximately $3.5 million to the
   local economy each year. For 13 years, poor fishing seasons plagued the lake, reducing
   the number of visitors to the Diamond Lake area. Restoring water quality and aquatic
   communities have  helped to also restore Diamond Lake's reputation as a favorite
   destination for trout anglers. According to ODFW, there were 72,085 angler trips in
   2007. These trips generated an estimated $3.76 million in sales and $2.57 million in
   labor income in the area (based on the 2006 value of the dollar). In addition to bringing
   in tourism dollars, improvements to the lake have also resulted in an increase in job
   opportunities. The Diamond Lake Resort, the third largest employer in the area, had a
   staff of 80 when tourism was suffering most and has since increased  the staff by over
   60 percent due to the boost in lake-based tourism.
Jun
Aug
Oct
               Figure 1. Reduction in algal blooms,
                  as represented by chlorophyll a,
                  before and after chub removal.
                      Diamond Lake-5

-------
                                        O Improved aesthetics. Significant reductions in nuisance algae occurred and the lake
                                          increased from a visible depth of 10 feet to almost 50 feet after implementation.
                                        O Increased educational awareness to prevent spread of invasive species.
                                          Several agencies including ODEQ, ODFW, Oregon State Marine Board, and Umpqua
                                          National Forest have focused their efforts on education as a means to prevent the
                                          spread of invasive species. It is illegal to use live bait for fishing anywhere in Oregon.
                                          The educational effort for Diamond Lake reminds visitors of that law through
                                          educational brochures and signage around the lake. In addition, partners conducted
                                          a boater survey to better understand boaters' habits and perceptions relating to
                                          the spread of invasive species. Educational efforts remind boaters and recreational
                                          enthusiasts of the simple steps they can take, such as washing boats and fishing
                                          equipment, to avoid giving aquatic hitchhikers a free ride to Diamond Lake.
Diamond Lake-6
                        December 2009 • EPA841-F-09-002S
                 For more information on the Diamond Lake TMDL, contact
                Paul Heberling, Oregon Department of Environmental Quality
                   heberling.paul@deq.state.or.us, (541) 440-3338x224
For more information on the Oregon TMDL Program, visit www.deq.state.or.us/WQ/TMDLs/TMDLs.htm

-------