United States
Environmental Protection
Agency
                             EPA/6OO/R-10/126 | September 2010 | www.epa.gov/ord
                Field  Study on Environmental
                Dredging Residuals:
                Ashtabula River
                Volume I. Final Report

                                                     . \
                                                     X
Office of Research and Development
National Risk Management Research Laboratory

-------
                                                    EPA/600/R-10/126
                                                      September 2010
FIELD STUDY ON ENVIRONMENTAL DREDGING
          RESIDUALS: ASHTABULA RIVER

             VOLUME I.  FINAL REPORT

                             by
                           Battelle
                     Columbus, Ohio 43201

                            and

                     Sea Engineering, Inc.
                     Santa Cruz, CA 95060
                    Contract No. EP-C-05-057
                        Task Order 50
                    Co-Principal Investigators

               Marc A. Mills and Richard C. Brenner
           Land Remediation and Pollution Control Division
           National Risk Management Research Laboratory
                     Cincinnati, OH 45268
           National Risk Management Research Laboratory
                Office of Research and Development
               U.S. Environmental Protection Agency
                      Cincinnati, OH 45268

-------
                                          NOTICE
The U.S. Environmental Protection Agency (U.S. EPA), through its Office of Research and Development
(ORD), funded and managed the research described herein under Contract No. EP-C-05-057. This report
has been subjected to the Agency's peer and administrative review and has been approved for publication
as a U.S. EPA document.
                                             in

-------
                                         FOREWORD
The U.S. Environmental Protection Agency (U.S. EPA) is charged by Congress with protecting the
Nation's land, air, and water resources. Under a mandate of national environmental laws, the Agency
strives to formulate and implement actions leading to a compatible balance between human activities and
the ability of natural systems to support and nurture life. To meet this mandate, U.S. EPA's research
program is providing data and technical support for solving environmental problems today and building a
science knowledge base necessary to manage our ecological resources wisely, understand how pollutants
affect our health, and prevent or reduce environmental risks in the future.

The National Risk Management Research Laboratory (NRMRL) is the Agency's center for investigation
of technological and management approaches for preventing and reducing risks from pollution that
threaten human health and the environment. The focus of the Laboratory's research program is on
methods and their cost-effectiveness for prevention and control of pollution to air, land, water, and
subsurface resources; protection of water quality in public water systems;  remediation of contaminated
sites, sediments, and ground water; prevention and control of indoor air pollution; and restoration of
ecosystems. NRMRL collaborates with both public and private sector partners to foster technologies that
reduce the cost of compliance  and to anticipate emerging problems. NRMRL's research provides
solutions to environmental problems by: developing and promoting technologies that protect and improve
the environment; advancing scientific and engineering information to support regulatory and policy
decisions; and providing the technical support and information transfer to  ensure implementation of
environmental regulations and strategies at the national, state, and community levels.

This publication has been produced as part of the Laboratory's strategic long-term research plan. It is
published and made available  by U.S. EPA's Office of Research and Development to assist the user
community and to link researchers with their clients.
                                            Sally C. Gutierrez, Director
                                            National Risk Management Research Laboratory
                                               IV

-------
This page intentionally left blank.

-------
                                     CONTENTS

NOTICE	iii
FOREWORD	iv
FIGURES	vii
TABLES	viii
ACRONYMS AND ABBREVIATIONS	ix
ACKNOWLEDGEMENTS	xi
EXECUTIVE SUMMARY	xii

1.0  PROJECT DESCRIPTION AND OBJECTIVES	1
    1.1    Purpose	1
    1.2    Dredge Residuals	2
    1.3    Site Description	3
    1.4    Dredge Operations	5
    1.5    Research Goals and Objectives	7

2.0  EXPERIMENTAL APPROACH	10
    2.1    General Approach	10
    2.2    Study Design	10
    2.3    Data Collection Strategy	12
          2.3.1  Sediment Core Collection	12
          2.3.2  Sonar Monitoring	13

3.0  CONTAMINATED  SEDIMENT CHARACTERIZATION AND DREDGE RESIDUALS
    ASSESSMENT USING A WEIGHT OF EVIDENCE APPROACH	16
    3.1    Vertical Alignment and Physical Examination of the Pre- and Post-Dredge Sediment
          Cores	16
          3.1.1  Vertical Alignment of the Pre-and Post Dredge Sediment Cores	16
          3.1.2  Physical Examination of the Pre- and Post-Dredge Sediment Cores	17
    3.2    Physical Parameter Analysis of Sediment Core Segments	18
    3.3    Sediment PCB Chemistry and Data Analysis of Core Segments	22
          3.3.1  Characterization of the Pre-Dredge Sediment PCB Inventory	22
          3.3.2  Characterization of the Post-Dredge  Sediment PCB Inventory	29
          3.3.3  Post-Dredge PCB Characteristics and Implications for Dredged Residuals	43
    3.4    Two (2)- and Three (3)-Dimensional PCB Modeling of Pre- and Post Dredge Areas	43
    3.5    Bathymetric  Surveys Prior to, During, and Following Dredging	48
    3.6    Survey and Dredge Position Data to Calculate Residuals	50
          3.6.1  Determination of the Maximum Dredge Cut Depth	55
          3.6.2  Determination of the Post-Dredge Sediment Surface	58
          3.6.3  Estimation of the Post-Dredge Residuals	58

4.0  DISCUSSION AND CONCLUSIONS	66

5.0  REFERENCES	69
                                          VI

-------
                                         FIGURES

Figure 1 -1.   Conceptual Model of Sediment Residuals During a Typical Dredging Operation	2
Figure 1-2.   Overview Map of the Ashtabula River and Project Study Site	4
Figure 1-3.   Ashtabula River Dredging Site and ORD Study Area	4
Figure 1-4.   Michael B.  Dredge at Ashtabula River	5
Figure 1-5.   Cutter-Head on the Michael B. Dredge at Ashtabula River	6
Figure 1-6.   HOPE Sediment Slurry Conveyance Piping	6
Figure 1-7.   Fields Brook Corridor	7
Figure 1 -8.   Ashtabula River Dredge Site Dredge Management Unit (DMU) Locations	8
Figure 2-1.   Transect Locations in the Ashtabula River	11
Figure 2-2.   Sediment Core Sample Locations in the Ashtabula River Study Area for Phase  1
            and 3 (Pre-  and Post-Dredging, respectively)	12
Figure 2-3.   Multi-Beam Sonar System Setup for the Ashtabula River Study	14
Figure 2-4.   Side Scan Sonar System Setup for the Ashtabula River Study	14
Figure 3-1.   Typical Pre-Dredge Sediment Core	17
Figure 3-2.   Comparison of Pre- and Post-Dredge Particle Size Distributions in Sediment at
            T172	19
Figure 3-3.   Comparison of Pre- and Post-Dredge TOC Concentrations in Sediment at T172	20
Figure 3-4.   Comparison of Pre- and Post-Dredge Dry Bulk Densities in Sediment at T172	21
Figure 3 -5.   Pre-Dredge Sediment t-PCB Concentration Profiles in the Study Area (> 0 ppb)	24
Figure 3-6.   Pre-Dredge Sediment t-PCB Concentration Profiles in the Study Area (> 100 ppb)	25
Figure 3-7.   Pre-Dredge Sediment t-PCB Concentration Profiles in the Study Area(> 1,000 ppb)	26
Figure 3-8.   Pre-Dredge Sediment Concentration Profiles in the Study Area (> 10,000 ppb)	27
Figure 3-9.   Pre-Dredge Sediment t-PCB Concentration Profiles in the Study Area
            (> 100,000  ppb)	28
Figure 3-10.  Composition Analysis Showing the Similarity in the PCB Composition of Surface
            Sediment Sample T174A (A) and a 3:1 Mixture of Aroclor 1248:1260 (B)	30
Figure 3-11.  Composition Analysis Showing the Similarity in the PCB Composition of
            Sediment Sample T174A from a Depth of 6.4-7.4 ft (A) and Aroclor 1248 (B)	31
Figure 3-12.  Composition Analysis Showing the PCB Composition of Sediment Sample T174A
            from a Depth of 11.4-12.4 ft (A; Homolog Composition) and T178C from a Depth
            of 16-16.5 ft (B; Congener Composition)	32
Figure 3-13.  Average t-PCB Concentrations in Pre-Dredge Surface, High-Level, and Lower
            Sediments and Post-Dredge  Surface Sediments	33
Figure 3-14.  The Total PCB Concentration in Pre-Dredge Lower Sediments and Post-Dredge
            Surface Sediments at the Sediment Coring Locations Presented in Table 3-2	33
Figure 3-15.  The Total PCB Concentration in Pre-Dredge Lower Sediments and Post-Dredge
            Surface Sediments at the Sediment Coring Locations Presented in Table 3-2	34
Figure 3-16.  Total PCB Concentrations in Pre- and Post-Dredge Core Samples from Locations
            T170BandT172B	35
Figure 3-17.  Pre-Dredge and Post-Dredge Comparison of PCB Homolog Composition in
            Sediment Within the Study Area (Tl 81 through Tl70)	37
Figure 3-18.  PCB Congener Composition in a Representative Mid-Depth Sample (A) and in a
            Pre-Dredge Lower Depth Sample (B)	38
Figure 3-19.  Principal Component Analysis (PCA) Using PCB Homolog Data for Pre- and Post-
            Dredge Sediments in the Study Area; Full View (upper) and Zoomed View (lower)	41
Figure 3-20.  Principal Component Analysis (PCA) Using PCB Congener Data for Pre- and Post-
            Dredge Sediments in the Study Area; Full View (upper) and Zoomed View (lower)	42
Figure 3-21.  Comparison of Pre- and Post-Dredge Cross-Section t-PCBs in Sediment at T175	44
Figure 3-22.  Comparison of Pre- and Post-Dredge Cross-Section t-PCBs in Sediment at T174	45
                                            vn

-------
Figure 3-23.  Comparison of Pre- and Post-Dredge Cross-Section t-PCBs in Sediment at T173	46
Figure 3-24.  Comparison of Pre- and Post-Dredge Cross-Section t-PCBs in Sediment at T172	47
Figure 3-25.  Pre-Dredge Bathymetric Survey Results for the Study Area	48
Figure 3-26.  Post-Dredge Bathymetric Survey Results of the Study Area	49
Figure 3-27.  Cross-Section View at T175 Showing the Change in Bathymetry During Dredging	51
Figure 3-28.  Cross-Section View at T174 Showing the Change in Bathymetry During Dredging	52
Figure 3-29.  Cross-Section View at T173 Showing the Change in Bathymetry During Dredging	53
Figure 3-30.  Cross-Section View at T172 Showing the Change in Bathymetry During Dredging	54
Figure 3-31.  Conceptual Model River Cross-Section Showing the XYZ Dredge Cutter-Head
            Position and Approximated Cut Line	56
Figure 3-32.  Plan View of Dredge Activity in the Study Area	57
Figure 3-33.  Estimated Dredge Cut Line in Between T176 and 172 in the Study Area	59
Figure 3-34.  Cross-Section of T175 Showing Estimated Dredge Cut Line vs. Post-Dredge
            Bathymetry	62
Figure 3-35.  Cross-Section of T174 Showing Estimated Dredge Cut Line vs. Post-Dredge
            Bathymetry	63
Figure 3-36.  Cross-Section of T173 Showing Estimated Dredge Cut Line vs. Post-Dredge
            Bathymetry	64
Figure 3-37.  Cross-Section of T172 Showing Estimated Dredge Cut Line vs. Post-Dredge
            Bathymetry	65
                                         TABLES

Table 3-1. Vertical Disagreement of Specific Pre-Dredge Cores	16
Table 3-2. Total PCB Concentration (ppb) of Pre-Dredge Surface Sediment, Typical Pre-Dredge
          High-Level Sediment, Pre-Dredge Sediment at Post-Dredge Surface Sediment Depth,
          and Post-Dredge Surface Sediment	23
Table 3-3. Estimates of Sediment and t-PCB Removals and Residuals	60
                                            Vlll

-------
                           ACRONYMS AND ABBREVIATIONS
2-D       2-Dimensional (view)
3-D       3-Dimensional (view)

AOC      Area of Concern
AOCs     Areas of Concern

CERCLA  Comprehensive Environmental Response, Compensation, and Liability Act
COC      chemical of concern

DMS      dynamic motion sensor
DMU     dredge management unit

GcGPS    Satellite Subscription Globally-Corrected GPS
GLLA     Great Lakes Legacy Act
GLNPO   Great Lakes National Program Office
GPS      global positioning system

HOPE     high density polypropylene

IGLD     International Great Lakes Datum, 1985

JFB       J.F. Brennan Company, Inc.

LOE      line of evidence
LOEs     lines of evidence

MBS      multi-beam sonar
MRU     motion reference unit

NA       not applicable
NERL     National Exposure Research Laboratory
NPDES    National Pollutant Discharge Elimination System
NRMRL   National Risk Management Research Laboratory

ORD      Office of Research and Development

PAH      polycyclic aromatic hydrocarbon
PAHs     polycyclic aromatic hydrocarbons
PCA      Principal Component Analysis
PCB      polychlorinated biphenyl
PCBs     polychlorinated biphenyls
PE        polypropylene

QA       quality assurance
QAPP     quality assurance project plan
QC       quality control
RSD
relative standard deviation

-------
RTK-GPS Real-Time Kinematic Global Positioning System

SDR      Standard Dimension Ratio
SPMDs   Semipermeable Membrane Devices
SPME    Solid Phase Micro-Extraction
SSS       side scan sonar

TOC      total organic carbon
t-PCBs    total polychlorinated biphenyls
TSS       total suspended solids

UCF      Upland Containment Facility
USAGE   U.S. Army Corp of Engineers
U.S. EPA  U.S. Environmental Protection Agency

VOCs     volatile organic compounds

WOE     weight of evidence

XYZ      horizontal and vertical position data

-------
                                  ACKNOWLEDGEMENTS
The support and participation of many researchers, administrators, and support staff were necessary to
carry out a multi-year project of this scope and magnitude. Funding provided by the National Risk
Management Research Laboratory (NRMRL) of the U.S. Environmental Protection Agency (U.S. EPA)
and the U.S. EPA Great Lakes National Program Office (GLNPO) to enable this project to be conducted
is gratefully acknowledged.  Collaborative efforts and mutual support between NRMRL, GLNPO, and
U.S. EPA's National Exposure Research Laboratory (NERL) provided a forum for exchanging ideas and
concepts and were vital to the success of this project.  The partnership and cooperation engendered on this
study has already begun to pay dividends on other projects.  The excellent service and attention to detail
of the project's contractor, Battelle, simplified and optimized the implementation of complex sampling
and analytical programs that generated the project's large and comprehensive dataset. The cooperation of
the project's dredging contractor, J.F. Brennan, in providing  dredge data and welcome advice was
essential in relating research field measurements to sediment inventories and dredging operations.

The authors of this report, Eric Foote, Greg Durell, Shane Williams, and John Hardin from Battelle; Marc
Mills and Richard Brenner from U.S. EPA/NRMRL; and Craig Jones and Jason Magalen from Sea
Engineering, Inc. (a subcontractor to Battelle) wish to express their appreciation to the following
individuals for their substantial and valuable contributions to this research undertaking:
           Battelle                    U.S. EPA/NRMRL               U.S. EPA/GLNPO
       Greg Headington                    Pat Clark                    Scott Cieniawski
           Jim Hicks                      Terry Lyons                    Marc Tuchman
        Bob Mandeville                  Paul McCauley
         Shane Walton               Joe Schubauer-Berigan
                                      Dennis Timberlake

       U.S. EPA/NERL                   J.F. Brennan               The McConnell Group
           Ken Fritz                      Mark Binsfeld                 Brandon Armstrong
         Brent Johnson                    Paul Olander                  Jason Berninger
         Jim Lazorchak                                                  Mark Berninger
          John Meier                                                   Herman Haring
         Paul Wernsing                                                    Paul Weaver
    U.S. Geological Survey
     Paul Baumann (retired)
                                              XI

-------
                                  EXECUTIVE SUMMARY
An interdisciplinary and collaborative research project to develop evaluation tools and methods for
environmental dredging was initiated in 2006 between the National Risk Management Research
Laboratory (NRMRL) and the National Exposure Research Laboratory (NERL) of the U.S Environmental
Protection Agency's (U.S. EPA's) Office of Research and Development (ORD), hereafter collectively
referred to as ORD, and U.S. EPA's Great Lakes National Program Office (GLNPO). GLNPO, through
the Great Lakes Legacy Act (GLLA), is charged with undertaking and overseeing the remediation of
contaminated sediments in the Great Lakes Areas of Concern (AOCs).  ORD, through its research
mission is directed to evaluate the application and efficacy of contaminated sediment remediation
technologies, such as environmental dredging. Based on these mutual interests, the two U.S. EPA
organizations formed a partnership to comprehensively monitor and assess progress on the Ashtabula
River Environmental Dredging Project in Ashtabula, OH. Dredging was selected by GLNPO as the
remedy of choice for the Ashtabula River to remove sediment contaminated with poly chlorinated
biphenyls (PCBs), the chemical of concern (COC) for this site.

Under this partnership, a series of environmental measurements were conducted on the Ashtabula River
beginning in the fall of 2006 to support the development of measures of remedy effectiveness. These
measurements were made to evaluate the efficacy of environmental dredging in removing a large quantity
of sediment contaminated with PCBs.  Samples of sediment and overlying water were collected and
analyzed before, during, and after dredging. In addition, measurements were made to characterize the
river's ecosystem also before, during, and after dredging to determine the impact that dredging had on the
ecosystem. Bathymetry measurements before  and after dredging using multi-beam and side-scan sonar
were also carried out.

Environmental dredging activities were performed on a 1.2-mile long reach of the Ashtabula River from
River Station 194-00 to River Station 139-00 near its confluence with Lake Erie beginning in the fall of
2006 and ending in the fall of 2007.  Extensive pre-dredging characterization efforts were undertaken in
the summer of 2006.  Numerous sediment resuspension, sediment mapping (bathymetry), and ecological
measurements were made during the dredging process in 2007.  Immediate post-dredging characterization
of sediment residuals was conducted in the fall and early winter of 2007.  Additional long-term
monitoring studies were implemented from 2008 to 2010. These studies evaluated remediation response
within indigenous food web species and measures to determine the effect of sediment depositional
processes on the original residual sediment layer. Long-term monitoring is needed to understand the rate
and extent to which ongoing natural processes impact surface sediment and whether newly deposited
sediment is intermixing with the original residual sediment layer.  Another ORD evaluation is being
planned for 2011 to continue the long-term investigation of sediment deposition following dredging and
the documentation of post-dredging ecosystem recovery. This investigation will be coordinated with
GLNPO as it plans a final post-dredging characterization of surface sediment in 2011 to measure remedy
effectiveness.

This report evaluates  and summarizes dredge residuals and dredge removal efficiency in support of
GLNPO's objectives for this joint project. This evaluation is restricted to pre-dredging characterization
studies conducted  in 2006 and post-dredging residuals information generated after completion of dredging
operations in 2007. Long-term residuals data produced from follow-on post-dredging field studies in
2009 are still being analyzed and are not included in this report. Investigative results of immediate and
long-term effects of dredging operations on ecosystem health and restoration using biological indicator,
food web, and surrogate sample data will be presented in a subsequent report.
                                              xn

-------
The primary goals of this phase of the project were to develop: 1) an understanding of sediment residual
formation during dredging operations on the Ashtabula River, and 2) methods to assist in generating more
realistic predictions of post-dredging residual mass/volume and contaminant concentrations.  To achieve
these goals, extensive monitoring studies and physical and chemical measurements were carried out prior
to, during, and after dredging. Field efforts focused on:

        1)  estimating the volume and concentration of contaminated sediment residuals remaining after
           completion of dredging in a selected study area within the dredge zone, and
        2)  comparing pre- and post-dredging sediment mass and concentration characterization data to
           assess the PCB concentration relationship of the residual sediment to the contaminated
           material removed.

A weight of evidence (WOE) approach was developed by ORD to characterize dredging residuals. The
WOE approach relied on multiple lines of evidence (LOEs) to measure residuals generated during
dredging.  Six LOEs consisting of chemical and physical measures were used to evaluate dredge residuals
in an attempt to address study objectives.  These LOEs included:

        1)  vertical alignment and physical examination of pre- and post-dredge sediment cores,
        2)  physical parameter analysis of the sediment,
        3)  sediment PCB chemistry and data analysis of core segments,
        4)  two- and three-dimensional PCB modeling of pre- and post-dredge areas,
        5)  bathymetric surveys prior to, during, and following dredging , and
        6)  dredge cutter head horizontal and vertical positioning.

The above tools, methods, and interpretations drawn were not applied on a site-wide basis, but rather to
ORD's selected study area of a 1,100-ft long stretch of the river from River Station 181-00 to River
Station 170-00. These approaches are being evaluated on spatial and temporal scales as necessary for
their development, and, therefore, cannot be used to evaluate the success of dredging for the entire site.

The residuals data produced in the project study area indicated consistent sediment and PCB mass
removals equal to or in excess of 95%.  The data also revealed that the sediment residuals layer was
composed of more highly contaminated sediments originating from higher elevations in the vertical
sediment profile, rather than the lower-concentrated sediments removed from immediately above the final
post-dredge sediment surface.

This final report is presented as Volume I of the Ashtabula River dredge residuals project. Due to the
large amount of data generated on this project, an additional data report (Volume II) will be issued by
ORD as an extended set of Appendices with additional data tables and figures.  A subset of these data is
included in this report to illustrate the approaches, methods, and interpretations applied on this project.
                                              xni

-------
                      1.0 PROJECT DESCRIPTION AND OBJECTIVES
1.1        Purpose

A joint dredging evaluation project was initiated in 2006 between the National Risk Management
Research Laboratory (NRMRL) and the National Exposure Research Laboratory (NERL) of the U.S
Environmental Protection Agency's (U.S. EPA's) Office of Research and Development (ORD), hereafter
collectively referred to as ORD, and U.S. EPA's Great Lakes National Program Office (GLNPO).
GLNPO via its Great Lakes Legacy Act (GLLA) mandate is charged with undertaking and overseeing the
cleanup/remediation of contaminated sediments in the Great Lakes Areas of Concern (AOCs). ORD,
through its research mission, is directed to evaluate the application and efficacy of environmental
dredging. Based on these mutual interests, the two U.S. EPA organizations entered into an agreement to
form a partnership to carry out a comprehensive effort to monitor progress on the Ashtabula River
Environmental Dredging Project in Ashtabula, OH. Dredging was selected by GLNPO as the remedy of
choice for the Ashtabula River to remove sediments contaminated with polychlorinated biphenyls (PCBs)
and other chemicals. PCBs constitute the chemicals of concern (COCs) for this project.

Environmental dredging activities were carried out on a 1-mile long reach of the Ashtabula River
beginning in the fall of 2006 and ending in the fall of 2007.  Dredging was not performed during the
2006/2007 winter. Extensive pre-dredging characterization efforts were undertaken in the summer of
2006 (Phase 1). Numerous sediment resuspension, sediment mapping (bathymetry), and ecological
measurements were made during the dredging process in 2007 (Phase 2). Post-dredging characterization
of sediment residuals was conducted in the fall and early winter of 2007 (Phase 3). Particular emphasis
was given in Phase 3 to measuring the quantity and composition of sediment residuals and the fraction of
contaminated  sediment removed by the dredging operation, i.e., estimating dredge removal efficiency.
Follow-up out-year studies were implemented in 2008 and 2010 to evaluate the degree of recovery
achieved in indigenous food web species  1 year and 3 years, respectively, after dredging and in 2009 to
determine the  rate and  extent that new clean sediment was being deposited on top of the original residual
sediment layer 2 years  after dredging and whether that newly deposited sediment was intermixing with
the original residual sediment layer. To assist in defining river bottom (i.e., sediment surface) topography
before and after dredging, multi-beam and side-scan bathymetry measurements were also conducted.
Additional out-year evaluations are being planned. GLNPO will implement a final post-dredging
characterization of sediment residuals at an unspecified future date to determine whether the site can be
closed in compliance with GLLA regulations.

In addition to  the extensive physical and chemical characterization of sediment and water column quality
performed throughout the project, a comprehensive suite of companion biological studies was also carried
out. These studies were conducted for the purpose of evaluating ecosystem recovery brought about by the
removal of contaminated sediments in the affected portion of the Ashtabula River over the course of the
dredging operation and for an extended period following removal. Chemical and toxicity measurements
were made on tissue of indigenous fish, clams, worms, and macrobenthos organisms. Measurements  of
PCB uptake by surrogate samplers known as semipermeable membrane devices (SPMDs) and solid phase
micro-extraction (SPME) systems in contact with surface sediment and the water column were also
performed.

This report constitutes  a summary of the results  on sediment removal efficiency and the quantity and
composition of the dredge residuals. Results of the biological (i.e., ecological restoration) segment of this
evaluation and the follow-on sediment residuals studies will be addressed in a subsequent report.

-------
1.2
Dredge Residuals
The remediation of contaminated sediments often involves the dredging of bed-sediment. Dredging,
whether used alone or in conjunction with other remediation technologies such as in-situ capping or
natural recovery, can result in the generation and release of COCs in the form of aqueous or particle-
associated contamination. The release of contaminants in particle-bound form is one of the possible
mechanisms for recontamination or deposition following dredge removal actions. These residual
sediments (hereafter referred to as 'residuals') can spread from both within dredged areas (near field) and
downstream or off site (far field). A  number of factors and suspected mechanisms can influence residual
levels including: dredging equipment; operator technique; debris; dredging to bedrock; over-dredging;
cut lines, slopes, and  depths; sediment characteristics; contaminant characteristics and distribution; and
the accuracy and resolution of contaminant characterization (USAGE, 2008a). Figure 1-1 is a conceptual
model illustrating mechanisms by which residuals can occur at a dredge site.
    Figure 1-1.  Conceptual Model of Sediment Residuals During a Typical Dredging Operation
Residuals can be categorized as either undredged or dredge generated. Undredged residuals are the result
of missed areas and incomplete characterization.  Dredge-generated residuals are released via
resuspension, transport, and downstream deposition; dredge mixing and immediate deposition; and
sloughing or slumping (USAGE, 2008b).

The primary generated residual release sources applicable to all dredging operations are resuspension and
dispersion of bedded sediment particles and pore water by dredging operations, including dredge heads,
boat props, and anchors. Additionally, residuals are generated by erosion and resuspension of sediments
and other high solids concentration layers on the bed surface, including fluff layers and fluid mud.

-------
1.3        Site Description

The Ashtabula River lies in extreme northeast Ohio, flowing into Lake Erie's central basin at the City of
Ashtabula (Figure 1-2). Its drainage basin covers an area of 137 sq mi, with 8.9 sq mi in western
Pennsylvania.  Major tributaries include Fields Brook, Hubbard Run, and Ashtabula Creek. The City of
Ashtabula, with an estimated population of approximately 21,000 (Year 2000 census), is the only
significant urban center in the watershed, with the rest of the drainage basin being predominantly rural
and agricultural.  Concentrated industrial development exists around Fields Brook (east of the Ashtabula
River) and east of the Ashtabula River mouth. Sediments in portions of the Ashtabula River are
contaminated with a variety of chemicals, including PCBs.

The PCBs were thought to have originated primarily from Fields Brook, a stream that drains into the
Ashtabula River in the area of the upper Turning Basin.  Fields Brook and its five tributary streams that
drain the 5.6-sq mi watershed have been identified as the primary source of contamination to the
Ashtabula River. The eastern portion of the watershed drains Ashtabula Township, and the western
portion drains the eastern section of the City of Ashtabula. The 3.5-mile main channel of Fields Brook
begins south of U.S. Highway 20, about 1 mile east of State Highway 11. From this point, the stream
flows northwesterly, just under U.S. Highway 20 and Cook Road, to the north of Middle Road.  The
stream then flows westerly to its confluence with the Ashtabula River near the Railroad Bridge and
Turning Basin. The industrial zone of Ashtabula is concentrated around the upstream reach of Fields
Brook from Cook Road downstream to State Highway 11.

Up to 20 separate industrial manufacturing activities, ranging from metal fabrication to chemical
production, have occurred in the area since the early 1940s. The decades of manufacturing activity and
waste management practices at industrial facilities resulted in the discharge or release of a variety of
hazardous substances to Fields Brook and its watershed, including the floodplain and wetlands area.

Sediments at the Fields Brook site were contaminated with PCBs, volatile organic compounds (VOCs),
polycyclic aromatic hydrocarbons (PAHs), heavy metals, phthalates, and  low level radionuclides.  VOCs
and heavy metals including mercury, lead, zinc, and cadmium have been detected in surface water from
Fields Brook and the Detrex tributary. Contaminants detected in fish include VOCs and PCBs.  The site
posed a potential health risk to individuals who ingested or came into direct contact with contaminated
water from Fields Brook and with contaminated fish or sediments.

Fields Brook has been eliminated as a source of contamination (or recontamination) of the Ashtabula
River. A Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup
of Fields Brook was completed in 2003.  Subsequently, a post-cleanup monitoring program was put in
place to protect against recontamination of Fields Brook as well as the Ashtabula River.

Approximately 600,000 cu yd of contaminated sediments were initially targeted for removal between the
Upper Turning Basin at the mouth of Fields Brook and the 5th Street Bridge (Figure 1-3).  The COCs in
this stretch of the river included PCBs; PAHs; hexachlorobenzene; hexachlorobutadiene; metals; and the
radionuclides uranium, radium, and thorium. The radionuclides were  above background levels but below
regulatory criteria.  In Phase 1 of this dredge residuals research project, GLNPO, under its GLLA
mandate, conducted a baseline characterization of the river that included all of these COCs, while ORD
focused only on the PCBs in selected areas of the river (as indicated by the yellow shading in Figure 1-3).
In Phases 2 and 3, ORD continued to focus on only the PCB inventory in the study area and selected areas
of the river where biological collections and surrogate deployments were  made.

-------
                         Ashtabula River
                           Project Site
                                                    0      10     20

                                                       I   I
                                                       SCALE IN MILES
Figure 1-2.  Overview Map of the Ashtabula River and Project Study Site
    Figure 1-3. Ashtabula River Dredging Site and ORD Study Area

-------
1.4
Dredge Operations
Dredging in the Ashtabula River was performed by J.F. Brennan Company, Inc. (JFB), a private marine
contractor headquartered in La Crosse, WI. Dredging operations were conducted in two stages. Stage I
included hydraulic removal of sediment from the upper portion of the GLLA project area down to an area
just above the Ashtabula Harbor (River Station 194-00 to 139-00), with U.S. EPA-GLNPO operating as
the lead agency.  Stage II included environmental and maintenance dredging, hydraulic removal of
sediment from just south of the 5th Street Bridge and extended northward into the inner harbor (River
Station 139-00 to 120-00), with the U.S. Army Corp of Engineers (USAGE) operating as the lead agency.

This report is focused on research carried out in conjunction with the GLLA dredging conducted during
Stage I, which began September 9, 2006 and was completed October 14,  2007. Stage I dredging
operations resulted in the removal, transport, and dewatering of approximately 491,711 cu yd of
contaminated sediment. Of particular interest are the dredging operations that were conducted between
River Station 181-00 to 170-00, hereafter referred to as the project study  area, where the target dredge cut
line elevation was established to achieve a final water column of 20 ft. Based on the low water datum for
International Great Lakes Datum (IGLD) 1985, Lake Erie IGLD85 of 569.2 ft, the final cut line target
elevation was set at 549.2 ft.

Sediment removal was achieved within the project study area by using a  12-in. hydraulic swinging-ladder
cutter-head dredge shown in Figures 1-4 and 1-5. The dredge was outfitted with a real-time kinematic
global positioning system (RTK-GPS). The RTK-GPS signals were combined with various sensors
onboard the dredge including sensors measuring rotation, ladder inclination, and pitch and roll.
                       Figure 1-4.  Michael B. Dredge at Ashtabula River
The GPS system and associated sensors were processed in real time and combined through Hypack, Inc.
Dredgepack® software to allow for dredge operator guidance to achieve maximum dredge accuracies.

-------
              Figure 1-5. Cutter-Head on the Michael B. Dredge at Ashtabula River


The complete dredging system consisted of a hydraulic dredge with associated equipment, a barge-
mounted slurry booster pump, and interconnecting piping for transferring the dredged sediment to the
land-based transport pipeline system. The barge-mounted slurry booster pump, with a 750-hp capacity,
was placed between the dredge and the land-based transport system.  The dredge discharge and booster
pump interconnecting pipe was standard dimension ratio (SDR) 17 high density polypropylene (HOPE)
with PE3408 resin, shown in Figure 1-6.
                     Figure 1-6. HOPE Sediment Slurry Conveyance Piping
The land-based transport system was comprised of three in-line booster pumps and 12-in. double-walled
slurry transport pipe extending over 2.5 miles along the Fields Brook Corridor (Figure 1-7) from its
mouth to the Upland Containment Facility (UCF). A slurry of water and sediment, consisting of 8 to 15%
solids, was treated at a rate of 5,000 gpm at the UCF. The UCF consisted of chemical conditioning of the
dredge sediment slurry, geotextile containment, and weep water collection/treatment. Following weep
water treatment to remove fine suspended solids and associated organic contaminants, water was returned
to the river under the conditions of the National Pollutant Discharge Elimination System (NPDES) permit
issued by Ohio EPA.

-------
                               Figure 1-7. Fields Brook Corridor
The Ashtabula River dredge site was organized into 27 discrete areas called dredge management units
(DMUs). The DMU layout is shown in Figure 1-8 and was organized as follows:

The "Upper Turning Basin" - The Upper Turning Basin defined the upstream boundary of the dredge site
and is where Fields Brook converges with the Ashtabula River. DMUs 1 through 14 comprised the
dredge management plan in the Upper Turning Basin.

The "River Run" - The River Run made up an approximate  1,300ft stretch of the Ashtabula River and
comprises parts of DMUs 13 and 14 at its  southern boundary and continues northward encompassing
DMUs 15 through 24, and parts of DMUs 25 and 26.  The ORD residuals research study occurred in
portions of DMUs 15 through 22.

The "River Bend" - The River Bend was defined by the area just south of the 5th Street Bridge where the
Ashtabula River 'bends' to the east. Parts of DMUs 25  and 26 and all of DMUs 27 and 28 were within
this area of the river.

1.5        Research Goals and Objectives

This research project was designed to provide an understanding of sediment residual formation during
dredging operations at the Ashtabula River and to develop methods to obtain more realistic
estimates/projections of post-dredging residuals mass/volume and contaminant concentrations based on
pre-, during- and post-dredging information and data. More specifically, the research goals were as
follows:

       1)  Develop baseline chemical and biological data prior to dredging to provide a basis of
           comparison with post-dredging residuals data for determining contaminated sediment
           removal efficiency.

-------
Figure 1-8.  Ashtabula River Dredge Site Dredge Management Unit (DMU) Locations

-------
       2)  Measure both pre- and post-dredging sediment topography and chemical concentrations (as a
           function of sediment depth) to determine whether a relationship exists between pre-dredging
           concentration profiles and dredge-generated residuals concentrations.
       3)  If a pre-dredging/post-dredging relationship exists, determine whether it can be used to
           predict residuals formation at other sites.
       4)  Determine whether generated residuals created by near-bed mixing and slumping can be
           differentiated from residuals  created by sediment resuspension and deposition.
       5)  Perform biological studies to evaluate the immediate impacts of contaminant removal on
           ecosystem measures of health and analyze long-term ecosystem changes in response to
           dredging.

The research objectives that were developed to accomplish these goals were as follows:

       1)  Generate physical, chemical, and biological data, as needed, on the contaminated sediments
           and surrounding ecosystem and water column of the Ashtabula River to evaluate and model
           resuspension of solids and release of PCBs during dredging operations in the designated
           study area.
       2)  Estimate the volume and concentration of contaminated sediment residuals remaining in the
           study area of the Ashtabula River following dredging.  Characterize the solids and determine
           PCB concentrations in the sediment residual inventory.
       3)  Compare pre- and post-dredging sediment mass (determined from depth, moisture content,
           and bulk density measurements) and concentration characterization data (both solids and PCB
           concentrations) to assess: a) dredging  removal efficiency (both solids and PCBs) in the
           residuals study area, and b) the PCB concentration relationship of the residual sediment to the
           contaminated material removed.
       4)  Generate reliable biological data on the Ashtabula River ecosystem following dredging.
       5)  Compare pre-, during-, and post-dredging biological data to define, if possible, ecosystem
           response to the impacts of environmental dredging on the Ashtabula River.

The project was implemented  in three discrete phases of work, hereafter referred to as Phase 1, Phase 2
and Phase 3, and defined as follows:
       •   Phase 1 - Measurements conducted prior to dredging
       •   Phase 2 - Measurements conducted during dredging
       •   Phase 3 - Measurements conducted post-dredging.


This report evaluates and summarizes dredge  residuals and dredge  removal efficiency as specified in
Goals 1 through 4 and Objectives 2 and 3. This evaluation is restricted to pre-dredging characterization
studies conducted in 2006 (Phase 1) and post-dredging residuals information generated after completion
of dredging operations in 2007 (Phase 3). Long-term monitoring data on the behavior and fate of dredge
residuals from post-dredging field studies conducted in 2009 are still being analyzed and are not included
in this report. Also, data specific to sediment resuspension and soluble releases during dredging (Phase 2)
as described in Objective 1 are not covered in this report. Investigative results of immediate and long-
term effects of dredging operations on ecosystem health and restoration using food web and surrogate
sample data  (Goal 5 and Objectives 4 and 5) will be presented in a subsequent report.

-------
                              2.0 EXPERIMENTAL APPROACH
2.1         General Approach

Field sampling activities carried out before, during, and after dredging consisted of a multi-faceted
approach to physical, chemical and biological characterization of the sediment inventory. During
dredging, sediment resupsension, sediment mapping, and contaminant release were measured using a
number ofin-situ and ex-situ analyses.  After dredging was completed, physical, chemical and biological
characterization of the sediment residuals was implemented using similar techniques with an emphasis on
measuring the quantity of sediment residuals and the fraction removed by the dredging operation. The
following sections of this report focus on the physical and chemical measures of the sediment residuals
portion of the investigation.

2.2        Study Design

The primary sediment investigation occurred in the "River Run" and specifically within the area bounded
by transects (T) 181 and 170 (Figure 2-1).  This study area was chosen as a location of specific interest
for the following reasons:
       •   River hydrodynamics were anticipated to be easier to characterize  compared to the 'Upper
           Turning Basin' (located approximately between T186 and T192) and the 'River Bend'
           sections of the river (the remaining two dredge areas selected for the Ashtabula River).
       •   A preliminary assessment of the historic data indicated that the 'River Run' had among the
           highest concentrations of total PCBs (t-PCBs) in the river due to its proximity to the historical
           Fields Brook source located at the beginning of the 'River Run' around  T186.  These elevated
           contaminant levels were anticipated to be an asset in characterizing pre- and post-dredging
           PCBs.
       •   The 'River Run' appeared to exhibit a t-PCB concentration gradient with the highest
           concentrations upstream near Fields Brook and the lowest concentrations downstream near
           the 'River Bend' area. This gradient was in turn thought to be useful when assessing post-
           dredge residuals in Phase 3.
       •   A section of the 'River Run' was designed to be dredged to bedrock below the sediment layer
           (upstream of T178), while lower-numbered transects with similar t-PCB concentrations were
           not planned to be dredged completely to bedrock, thus allowing the evaluation of dredging
           performance and residuals in areas of "soft sediment" vs. areas dredged to bedrock.
The sampling grid was constructed using 50- x 100-ft spacing. A semi-variogram analysis was conducted
to determine the requisite grid size using existing data acquired by the USAGE in 1990 and 1995. The
variogram analysis provided a quantitative descriptive statistic that could be used graphically to
characterize the spatial continuity of the dataset. Using this approach, it was determined that samples
collected at a grid spacing of less than 50 x 100 ft would result in redundant observations and samples
collected on a grid spacing larger than 50 x  100 ft would be spatially independent, which could lead to
excessive smoothing or loss of information at  some point.

As shown in Figure 2-2, the sample  design resulted in a combination of two to four sampling locations
per transect depending on the width of the river (blue squares). The sampling grid was designed to take
into account sediment sloughing that might occur on the perimeter of the dredge area, and, therefore, all
sediment cores were restricted to a 50-ft distance from the river bank (or bulkhead that occurs along some
eastern lengths of the study area).
                                               10

-------
 EXPLANATION
        AREA BOUNDARY
        DMU BOUNDARY
        STATION LINES
        DREDGE CUT CENTERUNES
(SOURCE: J.F. BRENNAN CO., 2007)
150        300
                                                                                                  SCALE IN FEET
                                                                                                                                  V

                                             Figure 2-1.  Transect Locations in the Ashtabula River

-------
 Figure 2-2. Sediment Core Sample Locations in the Ashtabula River Study Area for Phase 1 and 3
                             (Pre- and Post-Dredging, respectively)

2.3        Data Collection Strategy

The following sections describe the collection of data to support the evaluation of sediment residuals.
Additional details for this sampling strategy can also be found in the EPA-approved Quality Assurance
Project Plans (QAPPs) for Phase 1 and Phases 2 and 3 (Battelle, 2006; 2007).

2.3.1       Sediment Core Collection.

A total of 30 sediment cores were collected from the study area prior to and following dredging activities.
Sediment cores collected prior to dredging, where sediment thickness was at its maximum extent, were
collected using a vibracoring method. All pre-dredge sediment cores were sampled until encountering
refusal.  Consistent with the original plan, it was presumed that T181 to T177 would be dredged to a
depth confined by the bedrock layer, while dredging would continue only to 20 ft below the IGLD85 at
T177 to T170, leaving a layer of soft sediment above bedrock. As such, collection  of sediment cores to
refusal ensured that the  pre-dredge sediment cores would be as deep as or deeper than the target cut line.
In this way, a total of 16 sediment cores were collected in the area that was planned for dredging to
bedrock and 14 sediment cores were collected in the soft sediment area.  When coupled with chemical
analysis, this allowed for a full PCB vertical profile of the sediment above and below the target cut line.

Each sediment core was sectioned into intervals of 1 ft or less and submitted to the  laboratory for
processing and analysis. Sediment cores lengths were "reconstructed" on the laboratory bench top and
photographs of each core were taken and recorded.  The length of each sediment segment was determined
upon physical observation of the core with greater delineation focused in the range  of the target cut line.
Each core segment was  processed further by mixing in a laboratory blender for approximately 5 minutes
                                               12

-------
before analysis. Core segments were analyzed for 117 PCB congeners, total organic carbon, particle size
distribution, and bulk density.

Since post-dredge sediments were substantially reduced in thickness, cores were collected using a
hydraulically-driven piston core device.  Samples were  collected to a maximum depth of approximately 5
ft in some areas, with the intention to capture the post-dredge surface sediment and native (un-dredged)
sediment below. Post-dredge sediment cores were processed in the same manner previously described.
The sediment segment thickness decreased in the range of the target cut line and the frequency of
segments in this range increased. The post-dredge bathymetric survey (described below), as well as
visual observations of note and consideration of the target cut line elevation, played a major role in the
decision process as to where the post-dredge sediment cores would be sectioned.  Post-dredge core
sections were processed and analyzed for the same parameters as the pre-dredge core sections.

2.3.2       Sonar Monitoring.

Multi-beam sonar/side scan sonar (MBS/SSS) was deployed by boat to survey the sediment surface of the
river prior to and following dredging operations. To the extent possible, the receding sediment surface
was mapped while dredging was being conducted.

The surveying equipment was mounted on a 7.3-m pontoon vessel. A wooden  beam manufactured from
three 5 cm x 30 cm boards was laid (port to starboard) across the deck of the vessel and cantilevered over
each side. Construction straps were extended under the pontoons and around the ends of the beam,
fastening the beam securely to the deck.  The MBS was mounted off the vessel port side through a pole
mount affixed to the cantilevered end of the beam. Guyed wires were attached near the bow and stern of
the vessel and to the MBS head. The SSS was mounted similarly off the vessel starboard side. Figures 2-
3 and 2-4, respectively, show the MBS and SSS mounted on the vessel as deployed for use  on these
surveys.

The MBS system utilized was an Odom Echoscan II, a 90°, 3°-beam system. As such, it was equipped
with 30 transducers at 3° spacing so that the furthest beam away from vertical transmits was at a 45° angle
when the instrument was level in the water. A 90° swath was covered between the furthest  port and
starboard beams. The MBS head also contained a single beam transducer, which allowed for additional
depth quality  assurance (QA) and quality control (QC),  and it contained a motion reference  unit (MRU).
The MRU was a total suspended solids (TSS) dynamic motion sensor (DMS-25) that measured pitch, roll,
and heave.

The SSS was  a dual frequency C-MAX CM2 sonar, operating at 325 khz or 780 khz. The user selected
the desired horizontal imaging range from 12.5  m and 25.0 m at 780 khz, or 25.0 m, 50.0 m, 100.0 m and
150.0 mat 325 khz.

For both systems, a C-NAV satellite subscription globally-corrected global positioning system (GPS)
(GcGPS) was used for accurate horizontal positioning.  The antenna was fastened securely on the MBS
pole mount (blue antenna in Figure 2-3). A CSI Wireless Vector sensor was used to record vessel
heading, an integral component for both MBS and SSS  surveying.  Two CSI wireless GPS antennas were
mounted on top of the wooden console. The remaining topside survey equipment was mounted at the
base of the wooden console that was the data acquisition hub for the electronic  equipment.  Two laptop
computers were used to individually control and acquire data from the MBS and SSS.

A Global Water WL16U data logger measured water level fluctuations during the bathymetric surveys to
establish highly accurate (1 cm resolution) vertical survey control.  The water level logger was installed
inside a 3.0 m length of poly vinyl chloride (PVC) pipe and affixed securely to a stationary georeference
                                              13

-------
                                                  Globally-Corrected
                                                (satellite subscription)
                                                       GPS (GcGPS)
                                   Cantilevered Beam and Pole Mount
      ulti-Beam Sonar Head
Figure 2-3. Multi-Beam Sonar System Setup for the Ashtabula River Study

                                                   Data Acquisition
                                                       Console
CSI Vector Heading
      Sensors
     Submerged Side-
       Sonar and Mount
 Figure 2-4. Side Scan Sonar System Setup for the Ashtabula River Study
                                 14

-------
position (a bulkhead along one side of the river).  The elevation of the logger sensor was determined from
a proximate USAGE #611 located within the Ashtabula Yacht Club property. Water level elevation data
were referenced to the IGLD85.  Daily water level records were downloaded during the project.

A Digibar sound velocity profiler provided a relatively quick method for verifying the MBS soundings
and for calibrating the MBS daily.  The sound velocity profile was most important in regions prone to
density variations in the water column (typically a result of changes in salinity and/or temperature).
Significant variations in the  sound velocity were not observed in the Ashtabula River. To double check
the accuracy of the MBS soundings, a daily bar check verified that proper depths were being recorded.
The bar check is a simple method of holding a flat object at several predetermined distances beneath the
MBS transducers and comparing the observed depth to the actual depth.

Hypack/Hysweep data acquisition software  was used to collect and synchronize MBS measurements, SSS
measurements, GPS positioning, and GPS vessel heading measurements. Water level fluctuation and
sound velocity measurements were included with the data during post-processing to correct raw
soundings.

Survey QC was assured with daily verification of proper system operation.  Daily QC included
verification of accurate (satellite corrected) GPS position and heading data.  QC of the MBS system was
verified with sound velocity casts in the water column and bar checks for the sonar depth offsets. The
vertical survey control was verified by comparing the water level logger real-time output with  manual
elevation measurements at the location of the logger.

MBS and SSS surveys were conducted on a daily basis to measure the bathymetric variability  and dredge
cut slump progression and to create the imagery of the modified riverbed.  Surveys typically consisted of
a collection of individual data files corresponding to individual surveyed lines.
                                               15

-------
   3.0 CONTAMINATED SEDIMENT CHARACTERIZATION AND DREDGE RESIDUALS
               ASSESSMENT USING A WEIGHT OF EVIDENCE APPROACH
A weight of evidence (WOE) approach employing multiple lines of evidence (LOEs) was used to
characterize dredge residuals. These included: (1) vertical alignment and physical examination of the pre-
and post-dredge sediment cores; (2) physical parameter analysis of the sediment, including total organic
carbon (TOC), bulk density, and particle size distribution; (3) sediment PCB chemistry and data analysis
of core segments (congener and homolog) including Principal Component Analysis (PCA) of the PCB in
the sediment; (4) two (2)- and three (3)-dimensional PCB modeling of pre- and post-dredge areas; (5)
bathymetric and sonar surveys prior to, during, and following dredging; and (6) survey and dredge
position data to calculate residuals. These LOEs were used independently and collectively to characterize
the quantity and composition (chemical  and physical) of the dredge residuals.

3.1         Vertical Alignment and Physical Examination of the Pre- and
           Post-Dredge Sediment Cores

3.1.1       Vertical Alignment of the Pre- and Post-Dredge Sediment Cores.

Sediment cores collected during the pre- and post-dredge sampling events from each sampling station
were aligned vertically in virtual space using elevation data in an effort to pair pre- and post-core
segments and determine their commonality to the dredge cut line. Several parameters were used
independently and in combination to verify alignment for pre- and post-dredge core comparisons. These
included water depth information, core lengths, refusal depth, and pre- and  post-dredge bathymetric
survey data.

Of the 30 sample locations, pre- and post-dredge cores from seven specific  locations were difficult to pair.
Of these seven stations shown in Table 3-1, the pre-dredge core surface elevations as determined by water
depth and refusal were in disagreement with the sediment surface elevation determined by pre-dredge
bathymetry. These cores resulted in offsets of greater than 1 ft and as much as 5 ft in one case (T179B).

                 Table 3-1. Vertical Disagreement of Specific Pre-Dredge Cores
Core Location
T171A
T172A
T176B
T177B
T179B
T180A
T180B
Discrepancy (ft)
1.2
1.0
3.6
3.1
5.0
1.2
1.1
As such, several additional parameters were taken into consideration to determine the variability in core
pairing, including the core position in the study area and the accuracy of the bathymetric data in that
region of the study footprint.  In the end, the sediment surface elevation data from the in-field water
column and core length records were used to place the top of the core positions for these pre-dredge cores
and to pair them vertically with the post-dredge cores. The pre-dredge bathymetric data were used to
determine the pre-dredge core surface for the remaining 23 locations. The following factors contributed
to this decision:
                                              16

-------
        1)  These specific pre-dredge locations were observed to be in shallow water, less than 3 ft
           (T171A, T172A, T176B, and T177B) or near a significant slope at the river channel edge
           (T179B, T180A, and T180B).
        2)  The performance of the MBS at shallow depths was less accurate because the swath width
           became limited in shallower waters, resulting in less bottom coverage and the need for greater
           data interpolation across data gaps in these areas.
        3)  The stacked variability in the horizontal positioning was determined to be approximately ± 3
           ft at each sample station when considering a combination of the instrument accuracy and any
           variance associated with actual sampling. This resulted in a vertical variability in the
           sediment surface of 0.6 ft to 2.9 ft based on pre-dredge bathymetry and depending on
           location.

3.1.2      Physical Examination of the Pre- and Post-Dredge Sediment Cores

Sediment cores collected during the pre- and post-dredge sampling events were segmented and processed
for chemical and physical analysis.  Each core was carefully logged and photographed. Subsequent
comparison of physical sediment characteristics was completed on pre-dredge and post-dredge cores.
Figure 3-1 shows a section of a pre-dredge core collected at T181.  Often the pre-dredge cores exhibited
distinct  sediment depositional features such as multiple thin layers of varying sediment color (Figure 3-1).
These features indicate frequent, episodic events of particle suspension and sedimentation, resulting in
highly stratified cores.
                         Figure 3-1.  Typical Pre-Dredge Sediment Core
This stratification generally occurred above the dredge target cut line and did not occur in deeper
sediments.  Therefore, post-dredge sediment cores did not exhibit this stratification, and this feature could
not be used to pair the pre- and post-dredge cores in vertical space. Cores collected from the post-dredge
event appeared more homogenous and consisted of fine clays mixed with sand with very little observable
color patterns in the vertical profile. The coloration of post-dredge cores was very similar to pre-dredge
core pairs at similar elevations.
                                               17

-------
While color and stratification could not be used to identify dredge residual layers, two primary
observations were made of post-dredge cores that aided in their vertical positioning relative to pre-dredge
core segments. First, post-dredge cores appeared to be less consolidated; secondly, organic particles and
debris such as wood was observed in the  estimated target cut zone, lending evidence to mixing due to
dredge activity.

The core segmenting plan was based on a combination of variables that included visual observations,
physical characteristics, the target dredge cut line and project budget. Both pre- and post-dredge cores
were intentionally segmented at smaller intervals around the target cut line. The top (surface) of the post-
dredge core was also segmented into smaller intervals, to better detect differences due to residuals.  Each
segment was analyzed for PCB congeners as previously discussed and the chemistry of the pre- and post-
dredge core segments was compared. Elevation measurements collected during coring and  surveying
activities were used to vertically align the pre- and  post-dredge core segments.

3.2        Physical Parameter Analysis of Sediment  Core  Segments

In addition to sediment chemistry, physical parameter data were collected on each pre- and post-dredge
core segment (as sediment volume allowed). These parameters included dry and wet bulk density, TOC,
moisture content, and particle size (fractions - gravel, coarse sand, medium sand, fine sand, silt, and
clay).

Two approaches were implemented to compare the pre- and post-dredge datasets. To conduct
comparisons between pre- and post-dredge cores collected from the same location and at the same depth,
pre- and post-dredge core segments were lined up in vertical space such that they corresponded in
elevation.  This resulted in comparisons made for 14 sampling stations where core segments aligned well
vertically.  For comparison purposes, this analysis focused on a 6-in. vertical horizon from an elevation of
548 ft to an elevation of 547.5 ft. The 14 sampling stations were: T170A, T170B, T171A, T171B,
T172A, T172B, T173A, T173B, T174A, T174B, T176A, T178B, T179A, and T181D.  Simple summary
statistics were developed (min, max, mean and standard deviation) for each of the 10 parameters
measured (pre- and post-dredge), and scatter diagrams were developed plotting the post-dredging sample
value against the corresponding pre-dredging sample values for the same sampling station.  These data
comparisons produced the following observations:

       •   The average dry bulk density was approximately 20% lower for post-dredge sediment
           segments

       •   The gravel, coarse sand and medium sand contents of the samples were generally lower after
           dredging than before - on average about 25%, 75%, and 40% lower, respectively.

       •   The fine sand and clay contents of the sediment segment samples were approximately 50%
           and 7%  higher, respectively, for post-dredge sediment samples.

A second approach was employed to analyze and compare the  physical consistency of the pre- and post-
dredge sediments using 3-D block diagram visuals  (Earth Vision, Dynamic Graphics, Inc., USA). These
comparisons are shown as cross-section views for T172 in Figures 3-2 through 3-4.

As shown in Figure  3-2, a consistent and dominant band of sands was evident in the dredge cut line at this
transect with an overlying predominant layer of silt in the pre-dredge sediment. Post-dredge data
indicated the sediments were composed primarily of silt at the  cut line, presumably from mixing and
settling of the overlying sediments.  This pattern was substantiated by the shift in TOC from the
overlying zone of the pre-dredge to the post-dredge sediment surface as shown in Figure 3-3. Higher
levels of TOC are typically more characteristic of silt and clay sediments than of sand.  Lastly, Figure 3-4


                                              18

-------
                   Pre-Dredge
                        Depth
                        (ft msl)
                         566-
                         565-
                         564-
                         563-
                         562-
                         561-
                         560-
                         559-
                         558-
                         557-
                         556-
                         555-
                         554-
                         553-
                         552-
                         551-
                         550-
                         54B-
                         54B-
                         547-
                         546-
                         545-
                         544-
                         543-
                         542-
                         541-
                         540-
                         539-
                         53B-
                         537-
                         536-
                         535-
                  Post Dredge
                        Depth
                       (ft msl)
                         554-
                         553-
                         552-
                         551-
                         550-
                         549-
                         546-
                         547-
                         546-
                         545-
                         544-
                         543-
                         542-
                         541-
                         540-
                         53S-
                         538-
                         537-
                         536-
                         535-
                                       West
                                                                                East
                                       West
                                                                                 East
                               Particle Size Distribution
                                                                                     Horizontal Scale In Feet
                                                                                    Vertical Exaggeration = 5X
Figure 3-2. Comparison of Pre- and Post-Dredge Particle Size Distributions in Sediment at T172
                                                            19

-------
Pre-Dredge
     Depth
     (ft msl)
      566-
      565-
      564-
      563-
      562-
      561-
      560-
      559-
      558-
      557-
      556-
      555-
      554-
      553-
      552-
      551-
      550-
      549-
      548-
      547-
      546-
      545-
      544-
      543-
      542-
      541-
      540-
      539-
      538-
      537-
      536-
      535-

Post Dredge
     Depth

      554-
      553-
      552-
      551-
      550-
      549-
      548-
      547-
      546-
      545-
      544-
      543-
      542-
      541-
      540-
      539-
      538-
      537-
      536-
      535-
                                West
                                                                             East
                                West
                                                                             East
                          s
                                                                     Horizontal Scale In Feel
                                                                    Vertical Exaggeration = 5X
Figure 3-3.  Comparison of Pre- and Post-Dredge TOC Concentrations in Sediment at T172
                                                       20

-------
              Pre-Dredge
                   Depth
                   (ft msl)
                    566-
                    565-
                    564-
                    563-
                    562-
                    561-
                    560-
                    559-
                    558-
                    557-
                    556-
                    555-
                    554-
                    553-
                    552-
                    551-
                    550-
                    549-
                    548-
                    547-
                    •Jfi -
                    545-
                    544-
                    543-
                    542-
                    541-
                    540-
                    539-
                    538-
                    537-
                    536-
                    535-
             Post Dredge
                   Depth
                   (ft msl)
                    554-
                    553-
                    552-
                    551-
                    550-
                    549-
                    548-
                    547-
                    546-
                    545-
                    544-
                    543-
                    542-
                    541-
                    540-
                    539-
                    538-
                    537-
                    536-
                    535-
                                  West
                                                                            East
                                  West
                                                                            East
                          Btiik Densily (g/cm')
                            2 2--
                            20
                            I 7S
                            1.5
                            1.25
 Horizontal Scale In Feel
Vertical Exaggeration = 5X
Figure 3-4. Comparison of Pre- and Post-Dredge Dry Bulk Densities in Sediment at T172
                                                       21

-------
shows a decrease of dry bulk density in the post-dredge sediment surface as compared to the pre-dredge
sediments at the dredge cut line.  This indicated mixing at and below the estimated dredge cut line, further
supporting the maximum dredge cut elevations discussed in subsequent sections.

3.3        Sediment PCB Chemistry and Data Analysis of Core Segments

PCB chemistry analysis was conducted using samples collected prior to and following dredging in the
study area. PCB concentration and composition analyses were conducted on both pre- and post-dredge
sediment cores using congener and homolog data and PCA.

3.3.1       Characterization of the Pre-Dredge Sediment PCB Inventory.

Table 3-2 presents representative total PCB data for the surface, high-level (high concentration section),
and lower sections of the pre-dredge sediment cores,  and also for the surface of the post-dredge sediment.
The pre-dredge surface sediment data are based on the single surface segment, which was the top 1-ft
section of the core for most of the samples  (the top 0.4 to 0.75 ft was used for a few of the cores). The
pre-dredge high-level sediment data are based on a single representative sample from the most
contaminated section of the core; it is the segment of the core that had the highest PCB concentration.
Most of these pre-dredge high-level  samples were observed for a sediment depth of 5 to 8 ft, but they
covered a depth range of just less than 2 ft (T180A) to just over 10 ft (T181D).  The pre-dredge lower
sediment in Table 3-2 was a single sample from the depth (elevation) closest to that of the post-dredge
surface sediment.

Figures 3-5 through 3-9 illustrate a 3-D model of the  pre-dredge  PCB concentration sediment profile in
the study area. Each figure shows a distinct isoconcentration profile (shell) that varies both horizontally
and vertically. The lower isoconcentration shells are  removed consecutively in each succeeding figure.
Each figure, therefore, depicts the next highest isoconcentration shell until only the highest shell
representing a concentration of greater than 100,000 ppb remains in Figure 3-9. The pre-dredge surface
sediment t-PCB concentrations ranged from 152 ppb  (T175B) to 8,610 ppb (T176B); the average surface
sediment t-PCB concentration was approximately 1,000 ppb (Table  3-2). The pre-dredge subsurface
sediment t-PCB concentrations were highly variable,  ranging from less than 100 ppb to almost 200,000
ppb. The average t-PCB concentration in the most contaminated zone was approximately 100,000 ppb
(Table 3-2), while the sediments at greater depth had  highly variable PCB concentrations that were more
comparable to the surface sediment PCB concentrations. The most contaminated sediments were
generally noted at 5 to 10 ft depth, but highly contaminated sediments were found at less depth at some
locations. The t-PCB concentration at the most contaminated depth was generally between 50,000 ppb
and 150,000 ppb, but was less than this at some locations (T178A, T179A, T180A, T181A, and T180B)
and more at some locations (T173A, 177B, and T178C). The surface and subsurface PCB concentrations
were variable within the study area, but no  obvious pattern of increasing or decreasing concentrations
geographically was evident. The largest volume of highly-PCB-contaminated sediment (i.e., the greatest
depth of the highly  contaminated zone) was in the eastern side of the river between transects T176 and
T181.
                                              22

-------
 Table 3-2. Total PCB Concentration (ppb) of Pre-Dredge Surface Sediment, Typical Pre-Dredge
  High-Level Sediment, Pre-Dredge Sediment at Post-Dredge Surface Sediment Depth, and Post-
                                    Dredge Surface Sediment
Sediment Core
T170A
T170B
T171A
T171B
T172A
T172B
T173A
T173B
T174A
T174B
T175A
T175B
T176A
T176B
T177A
T177B
T178A
T178B
T178C
T179A
T179B
T179C
T180A
T180B
T180C
T180D
T181A
T181B
T181C
T181D
Average
Std. Dev.
RSD (%)
Pre-Dredge
Sediment
Surface00
581
733
641
223
651
208
848
367
1,140
234
174
152
494
8,610
430
740
3,320
425
889
201
1,820
1,250
160
284
539
3,120
585
3,130
820
743
1,120
1,660
149
High-Level(b)
101,000
141,000
63,900
55,700
85,700
120,000
197,000
115,000
103,000
92,100
84,300
100,000
77,200
147,000
70,200
117,000
2,760
129,000
191,000
19.3
107,000
127,000
228
7,090
87,000
118,000
159
65,300
144,000
126,000
92,500
52,500
57
Lower(c)
(at post-dredge
surface depth)
319
1,020
133
1,120
96.1
454
226
370
317
902
52.7
22,700
5,760
20,400
677
1,970
7.6
6,700
1,400
8.0
300
1,010
16.5
59.7
1,470
50.8
159
107
3,660
3,340
2,490
5,440
218
Post-Dredge Sediment
Surface(d)
6,960
7,150
12,900
46,200
50,500
4,460
27,000
4,300
10,200
11,600(0.92')
9,250
6,960 (0.85')
5,830
19,700
4,820
4,550
3,580
7,460
6,740
3,940
11,700(0.6')
8,260 (0.95')
825
11,700
12,500
7,280
539
1,050 (0.8')
6,320 (0.85')
5,970 (0.9')
10,700
11,600
108
(a) The pre-dredge surface sediment is the single sample representing the top 1 ft of the sediment core.
(b) The pre-dredge high-level sediment is the single sub-surface sediment sample with the highest PCB
    concentration representing the most contaminated sediment depth.
(c)  The pre-dredge lower sediment is a single sample from the approximate depth equivalent to the post-dredge
    surface sediment.
(d)  The post-dredge surface sediment data are a sample (core segment length)-weighted average concentration of
    the samples that represent the top 1 ft of the sediment core. Between two and seven segments were used,
    depending on the core.  If the post-dredge core was less than 1 ft in length, the data represent a weighted
    average of all samples in the core, and the core length is indicated in parenthesis.
                                                23

-------
Figure 3-5. Pre-Dredge Sediment t-PCB Concentration Profiles in the Study Area (> 0 ppb)

-------
Figure 3-6.  Pre-Dredge Sediment t-PCB Concentration Profiles in the Study Area (> 100 ppb)

-------
Figure 3-7. Pre-Dredge Sediment t-PCB Concentration Profiles in the Study Area (> 1,000 ppb)

-------
to
                          Figure 3-8. Pre-Dredge Sediment Concentration Profiles in the Study Area (> 10,000 ppb)

-------
Figure 3-9.  Pre-Dredge Sediment t-PCB Concentration Profiles in the Study Area (> 100,000 ppb)

-------
The sediment PCB composition was evaluated using both homolog and congener-specific data. The
analysis indicated that the PCB composition in the surface sediment was dominated by PCB Aroclor
1248-type contamination, with some influence from PCB Aroclor 1260. An approximate 3:1 composition
of Aroclor 1248:1260-type contamination was evident in most of the surface sediments as illustrated in
Figure 3-10 with apre-dredge surface sample from core T174A. The Aroclor 1248 predominance was
strongest near Fields Brook, even in the surface sediments. Other investigations have noted historic
sources of Aroclor 1260-type contamination from Strong Brook across the Upper Turning Basin from
Fields Brook. The Aroclor 1260 contribution from this source was evident in most of the surface
sediments; however, it was not observed at depth. This observation would suggest that the Strong Brook
source of Aroclor 1260 may have been active only recently.

The most contaminated subsurface sediments had a PCB composition that closely resembled Aroclor
1248 (as demonstrated for a mid-depth core segment in Figure 3-11). This close match with Aroclor 1248
was observed throughout the study area in most sediment below 1 ft in depth and in all of the most
contaminated sediment. Sediment samples with a total PCB concentration above 10,000 ppb all showed a
very close compositional match with Aroclor 1248. The sediments collected from the greatest sediment
depth (the lowest elevation)  that were below the most contaminated zone exhibited a PCB composition
that also was dominated by an Aroclor 1248 signature. However, these samples also had a noticeable
contribution of highly-chlorinated PCB congeners (e.g., chlorination levels of 8, 9, and 10) that do not
have a clear relationship to any particular Aroclor formulation as demonstrated in Figure 3-12.  The high
relative amounts of PCB209 (decachlorobiphenyl) compared to the octa- and nonachlorobiphenyls,  for
instance, were greater than in the more commonly-used highly-chlorinated Aroclor formulations (e.g.,
Aroclor 1268) and other commonly-used PCB formulations. The distribution may also not be explained
by environmental alteration processes. Little information is available on the rarely-used Aroclors 1269,
1270 and 1271, but it has been described that they contain high proportions of decachlorobiphenyl, so
some contribution from one  of those Aroclors possibly together with Aroclor 1268 might be a possibility
in these deeper sediment.  The  sediments with this unique composition generally had low t-PCB
concentrations ranging from less than 1,000 to approximately 3,000 ppb.

3.3.2       Characterization  of the Post-Dredge Sediment PCB Inventory.

An important objective of the study was to characterize the chemical and physical composition of the
post-dredge sediment and evaluate whether these sediments were dredge-generated residuals.  Table 3-2
summarizes t-PCB data for the post-dredge surface sediments, along with representative pre-dredge
sediment data. The post-dredge surface sediment data presented in Table 3-2 are the core segment-length
weighted average concentration of the samples closest to the top (surface) of the post-dredge sediment
cores, representing the top 1 ft.  Between two and seven samples were used to determine the average 1-ft
post-dredge surface sediment concentrations in Table 3-2; the number of samples depended on how the
cores were segmented. A few post-dredge cores were collected to a depth of less than 1 ft (Table 3-2),
and the concentration of the  deepest segment was then assumed to be representative of the concentration
to a depth of 1 ft.

The post-dredge subsurface sediment t-PCB concentrations represented in Table 3-2 ranged from 539 to
50,500 ppb, and averaged 10,700 ppb. The average t-PCB concentration was significantly higher in the
post-dredge surface sediments than in both the pre-dredge surface sediment (1,120 ppb) and the pre-
dredge sediments at the post-dredge surface sediment elevation (2,490 ppb; Figure 3-13). In fact, the
post-dredged surface sediment PCB concentrations were higher than the pre-dredge concentrations for
similar elevations at 28 of the 30 locations (Figure 3-14).  The two post-dredge locations with comparable
or slightly lower PCB concentrations were from the same general area (T175B and T176B), suggesting
                                              29

-------
                          PCBHomologComposition-174A Surface
                                   4567
                                   Level of Chlorination
10
    A)  Pre-Dredge Core Sample T174A (surface sediment)
                             PCB Homolog Composition (Aroclor)
                                   4567

                                     Level of Chlorination
10
    B)  PCB Aroclor 1248:1260 (3:1)

Figure 3-10.  Composition Analysis Showing the Similarity in the PCB Composition of Surface
         Sediment Sample T174A (A) and a 3:1 Mixture of Aroclor 1248:1260 (B)
                                        30

-------
                  PCBHomolog Composition -T174A Center Depth (6.4- 7.4ft)
                                    4567
                                      Level of Chlorination
10
     A) Pre-Dredge Core Sample T174A (from 6.4-7.4 ft sediment depth)
                             PCB Homolog Composition (Aroclor)
                                    4567

                                      Level of Chlorination
10
     B) PCB Aroclor 1248

Figure 3-11.  Composition Analysis Showing the Similarity in the PCB Composition of Sediment
             Sample T174A from a Depth of 6.4-7.4 ft (A) and Aroclor 1248 (B)
                                         31

-------
                   PCBHomologComposition-T174A Lower Depth (11-12 ft)
             0 4-
                   123456789     10
                                     Level of Chlorination
    A)  Pre-Dredge Core Sample T174A (from 11.4-12.4 ft sediment depth)
PCB Congener Composition


-------
                Average Sediment Total PCB Concentration (ppb)
     100,000
      90,000
      80,000
      70,000
      60,000
      50,000
      40,000
      30,000
      20,000
      10,000
           0
                   500
i.izu
Pre-Dredge Surf ace  Pre-Dredge High-
                      Level
                                               Pre-Dredge Lower
                                                (at post-dredge
                                                 surf ace depth)
                                               Post-Dredge
                                                Surface
  Figure 3-13. Average t-PCB Concentrations in Pre-Dredge Surface, High-Level, and Lower
Sediments and Post-Dredge Surface Sediments. Pre-Dredge Lower Sediments are from the Same
          Elevations as Post-Dredge Surface Sediments.  Based on Data in Table 3-2.
60,000
50,000
40,000
30,000
20,000
10,000
0
Sediment Total PCB Concentration (ppb)





;





• Pre-Dredge Lower (at post-
dredge surface depth)
• Post-Dredge Surface


, ,1
lIu.U.ll Ul JJ

-------
Sediment Total PCB Concentration (ppb)
50,000
40,000

30,000
20,000
10,000
0



















• Post-Dredge Surface




Mean
Surfac

1 1 1 1 1 1

Post-Dredge Mean Pre-Dred
e Concentration Concentration a
1 Dredge Surface
_L
1

36
t Post-
Elevation
II
_ - 1 1

-------
                                     Core: 170b
  562




  560




  558




  556




£• 554


c

£ 552
CO


1

w 550




  548




  546




  544




  542
                                                                           • Pre-dredge



                                                                           A Post-dredge
'• A
     *
        20,000      40,000      60,000      80,000      100,000


                                  Total PCB by SUM (ng/g)
                                                                     120,000
140,000
160,000
Core: 172b
562 -i —

CCQ _
EEC _

_g
"CD
LJJ
C/1Q _


3

• Pre-dredge
A Post-dredge

;*
; •
: •
•
:
•
li^L
I
jf



0 20,000 40,000 60,000 80,000 100,000 120,000 140,000
Total PCB by SUM (ng/g)
      Figure 3-16.  Total PCB Concentrations in Pre- and Post-Dredge Core

                   Samples from Locations T170B and T172B
                                        35

-------
                                      Core: 173a
564

562

560

558

556

554

552

550

548

546

544

542
                                                                         • Pre-dredge

                                                                         A Post-dredge
'£
               50,000
                                   100,000            150,000
                                     Total PCB by SUM (ng/g)
200,000
250,000
CoreL: 175a
558-


g
c
~ 552 -
CO
1
LJJ
C/1Q

t^AA -
:

: •
: •

• Pre-dredge
A Post-dredge



: •
: o
CTH2

0 10,000 20,000 30,000 40,000 50,000 60,000 70,000
Total PCB by SUM (ng/g)



80,000 90,000
  Figure 3-16. Total PCB Concentrations in Pre- and Post-Dredge Core Samples
                 from Locations T173A and T175A (Continued)
                                       36

-------
                               PCB Homolog Composition
                                  (based on total PCB mass)
                                       4567
                                         Level of Chlorination
10
             Figure 3-17. Pre-Dredge and Post-Dredge Comparison of PCB Homolog
              Composition in Sediment Within the Study Area (T181 through T170)
The PCB composition of the pre-dredge sediments with the highest PCB concentrations closely
resembled Aroclors 1248 (Figures 3-18A and D). The composition of the pre-dredge sediments at the
elevations (sediment depths) of the actual post-dredge cut line had a PCB composition with a significant
proportion of Aroclor 1248, but had a unique composition that also included notable amounts of highly-
chlorinated PCB congeners (Figure 3-18B), as can be seen in the right-hand corner of the congener
distribution histogram from PCB 170 to PCB209 (compare Figure 3-18B with Figure 3-18A). However,
the post-dredge surface sediments had a PCB composition that closely resembled Aroclor 1248 without
any notable contributions from most of the highly-chlorinated PCB congeners with the exception of some
congener PCB209 (Figure  3-18C). The PCB composition of the post-dredge surface sediments did not
resemble the composition of the sediments collected from the same pre-dredge elevation, but resembled
the composition of the more contaminated sediments from a higher elevation. Again, if the dredged
sediments were removed with complete effectiveness and no additional  residuals were created during the
dredging operation, one would expect the post-dredging surface sediment PCB composition to be
equivalent to that of the pre-dredged sediments at the same depth, not to that of the highly contaminated
sediments from a higher elevation as was observed in this study.

In addition to the PCB homolog and congener composition data review, similarities and dissimilarities in
PCB composition were assessed using exploratory PCA techniques. PCA is an exploratory data analysis
tool. Exploratory algorithms are designed to reduce large and complex datasets to a suite of best views.
PCA is used as a means to  explore the variability in the PCB composition of the samples. Specifically,
one form of PCA output is 2- or 3-dimensional factor score plots in which the principal component scores
for each sample are  cross-plotted. If a significant portion of the variance in the dataset is accommodated
in the first few principal components, then the Euclidean distances between sample points on such plots
(e.g., PCI v PC2 or PC2 v  PC3) provide a measure of their chemical similarity. Samples that visually
"cluster" are chemically similar and vice versa.
                                             37

-------
PercentCongenerComposition: T181C Center Depth
Q
OD
0. C
of Total
i C
5? ^

-------
Percent CongenerComposition: T175A-SP Surface
Q
CD
U
Q. c
of Total
^. c
S< ^
o
V
ap 2
0
u




J

1

3^ LJ LJ O i
g g




Ill

N
m ^
u u





Lll






i

3 g 3 S


^



Illlllllllll, III 	 .

SS3ESSS! £> Ol 00 O
Percent Congener Composition: Aroclor 1248




,1,11

s a a
3^ LJ LJ
O



|



1,




S S S °
S" LJ LJ LJ
rn
LJ







||

m ID c






1






?SSSaES£ia!S;™°m3^!S°S™SSa!oS
«_ IN m LJ
a S S"

PCB Congener
     D) Aroclor 1248

Figure 3-18. PCB Congener Compositions in a Representative Post-Dredge Surface Sample (C)
 and in Aroclor 1248 (D). The Pre-Dredge Lower Sediment Sample (B) is from a Comparable
          Elevation as the Post-Dredge Surface Sediment Sample (C). (Continued)
                                        39

-------
Another form of PCA output, factor loading plots, is used to determine which individual variables (in our
case PCB homologs and congeners) are responsible for any visual "clustering" observed. As such, PCA
was a useful data analysis and exploration tool for this project dataset.

This data visualization and exploration was performed using the software EinSight (v. 4.04) by
InfoMetrix, Inc. (Woodinville, WA), which provides qualitative data exploration capabilities.  The PCA
exploratory technique was used to help recognize groups of samples that may have shared similar PCB
composition (i.e., similar relative PCB homolog and congener concentrations) and those that have clearly
different compositions. Prior to PCA analysis, the PCB congener data were normalized to the t-PCB
concentration in each sample to eliminate influences caused by  concentration alone. The goal of these
analyses was to identify difference and similarities between samples based on PCB pattern recognition.
Aroclor formulations were also included in the dataset for comparison purposes.

The PCA analyses confirmed the observations made during the  earlier described review of the PCB
homolog and congener data and further documented the pre- and post-dredge sediment samples' PCB
compositional similarities and relationships. The PCA results were similar regardless of whether the
analysis was conducted using homolog or individual congener data.  The PCA results are shown in
(Figures 3-19 and 3-20). The results clearly indicated that the majority of the pre-dredge subsurface
samples from the depths with high PCB concentrations and the  post-dredge surface samples had similar
PCB compositions (likely from the same source of PCBs).  These samples  all appeared to be from the
same Aroclor 1248 source, as these samples clustered closely with each other and at the Aroclor 1248
reference composition.  The  pre-dredge surface sediments had a slightly different composition and were
drawn away from Aroclor 1248 towards Aroclor 1260 with many of the surface sediment samples
clustering closely with a 3:1  mixture of Aroclor 1248:1260.  These samples clearly had a significant
contribution from the Aroclor 1248 source but also some contribution from a source of Aroclor 1260.
The pre-dredge samples from below the most contaminated zone and at the elevation (sediment depth)
equivalent to that of the post-dredge surface  sediment were also drawn away from Aroclor 1248, but in a
different direction.  These pre-dredge samples from a greater depth were drawn towards Aroclor 1268,
with a number of them clustering near a mixture  of Aroclor 1248 and 1268, which indicated some
contribution from a highly-chlorinated PCB  source.

The PCA results supported the earlier findings suggesting that the PCBs in the post-dredge surface
sediments originated primarily from the most contaminated zone in the pre-dredge sediments.  As before,
if the dredged sediments were removed completely and no additional residuals were created during the
dredging operation, one would expect the post-dredging surface sediment PCB compositions (and the
PCA results) to be similar to those of the pre-dredged sediments from the equivalent sediment depths.
Therefore, the post-dredge sediment samples would be expected to cluster towards the Aroclor 1248/1268
material along with the pre-dredge deep sediment samples. Instead what was observed was that the post-
dredge surface sediments clustered with the pre-dredge samples from the highly contaminated zone
typical of a higher elevation.
                                              40

-------
          Most pre-dredge samples from the elevation
          (depth) equivalent to the post-dredge surface
                                           Aroclor 1248/1268
                              Most pre-dredge sub-surface samples from the
                              contaminated zone and post-dredge surface samples
                Aroclor 1248/1260 (3:1)
                Most pre-dredge surface samples

                                                                                          T180C-L


                                                                                          'T177B-L
                                                             Most pre-dredge sub-surface samples from the
                                                            ^&Sfftaminated zone and post-dredge surface samples
                                Aroclor 1248
                                                                                   'T171A-ST172A-S
Figure 3-19. Principal Component Analysis (PCA) Using PCB Homolog Data for Pre- and Post-
       Dredge Sediments in the Study Area; Full View (upper) and Zoomed View (lower)
                                                     41

-------
                                                                    Most pre-dredge sub-surface samples from the
                                                                    contaminated zone and post-dredge surface samples
                                Most pre-dredge surface samples
                                                     Aroclor 1248/1 260 (3:1)
                                                                                 •T174B-L   T17!e\™v
                                                                                        •T180C-W*I
                                                                          'T172A-L              /
                                                               T170A-L
                                                                "T173A-L
  JUT-


T172A-SP
                                                                        T171B-L __	—
                                             Aroclor 1248/1268
                                                                Most pre-dredge samples from the elevation
                                                                (depth) equivalent to the post-dredge surface
                                                                                       'A1232
                                                                    Most pre-dredge sub-surface samples from the
                                                                    contaminated zone and post-dredge surface samples
Figure 3-20. Principal Component Analysis (PCA) Using PCB Congener Data for Pre- and Post-
        Dredge Sediments in the Study Area; Full View (upper) and Zoomed View (lower)
                                                       42

-------
3.3.3       Post-Dredge PCB Characteristics and Implications for Dredged Residuals.

The relatively uniform post-dredge surface sediment PCB concentrations and composition, compared to
the pre-dredge samples, indicated that the post-dredge surface sediments generally did not originate from
the less uniform pre-dredge sediments from the same location and elevation.  In addition, the PCB
concentrations and composition of the post-dredge surface were dissimilar from the pre-dredge sediments
from the same elevation, indicating that they were not closely related.  The significant increase in the
PCB concentration of the post-dredge surface sediments, compared to the pre-dredge sediments from the
same elevation, suggests that the post-dredge surface sediments originated from the more contaminated
sediments.  In addition, the PCB compositions of the post-dredge surface sediments were essentially
identical to the PCB compositions of the highly contaminated pre-dredge sediments at higher elevations.
Thus, the post-dredge surface sediments appeared to be dredge residuals originating from well-mixed pre-
dredge sediments from the  most contaminated pre-dredge sediment depths. The most contaminated pre-
dredge sediments clearly had a significant influence on the concentration and composition of the post-
dredge surface sediments, even though those most contaminated pre-dredge sediments were generally
found a few feet above the  dredge cut line.

3.4    Two (2)- and Three (3)-Dimensional PCB Modeling of Pre- and Post Dredge Areas

3-D block diagram visuals  for t-PCBs in sediment before and after dredging were constructed using
Earth Vision modeling and visualization software. A total of 328 and 149 data points were used in the
calculation  of the t-PCB grid for the pre-dredge and post-dredge data, respectively. The 3-D minimum
tension gridding algorithm  calculated a smooth surface that closely fit the input data values using a
bicubic spline technique. The t-PCB visuals shown in this report have a unit rectangular lattice or grid
cell size of 20 ft in the X direction, 20 ft in the Y direction, and  1 ft in the Z (depth) direction. The grids
were contoured using an irregular contour interval to best visualize the broad concentration data
distribution for t-PCBs.

Figures 3-21 through 3-24 provide cross section views of the pre- vs. post-dredge sediment t-PCB
concentrations as a function of elevation for T175, T174, T173, and T172, respectively.  In these figures,
the post-dredge t-PCB concentration contour is shown at the top and the pre-dredge sediment t-PCB
contour is shown at the lower portion of the figure.  The elevation intervals and scale are consistent
among figures, and the estimated dredge cut line and pre- and post-dredge bathymetry are consistent with
the surfaces shown in subsequent figures (see Section 3.6 for methods used to determine the maximum
dredge cut line).

It is worth noting that in some cases post-dredge cores were not driven as deep as the pre-dredge cores in
similar locations.  As such, the post-dredge concentration contours represent greater interpolation from a
general lack of local data in those cases.

The post-dredge sediment surface at T174 increased an order of magnitude. This was also the case in
Figures 3-22 and 3-23 where T173 and T172 are shown, respectively.  Post-dredge sediment surface
concentrations increased by 10 to 20 times, resulting in concentrations ranging from 2.7 to 4.6 ppm.
                                               43

-------
               Pre-Dredge
                    Depth
                    IX msl)
                     566-
                     565-
                     564-
                     563-
                     562-
                     561-
                     560-
                     559-
                     558-
                     r>C,7 -
                     556-
                     555-
                     554-
                     553-
                     552-
                     551-
                     550 -
                     549-
                     548-
                     547-
                     546-
                     545-
                     544-
                     543-
                     542-
                     541-
                     540-
                     539-
                     538-
                     537-
                     536-
                     535-
               Post Dredge
                    Depth
                    (« msl)
                     551-
                     550-
                     549-
                     Ma -
                     547-
                     546-
                     545-
                     544-
                     543-
                     542-
                     541-
                     540-
                     539-
                     538-
                     537-
                     536-
                     535-
                                West
                                                                                 East
                                West
                                                                                 East
                               100.000
                               10,000
                               1.000
                               100
 Horizontal Scale In Feet
Vertical Exaggeration = 5X
Figure 3-21. Comparison of Pre- and Post-Dredge Cross-Section t-PCBs in Sediment at T175
                                                        44

-------
                               Pre-Dredge
                                    Depth
                                    (ft msl)
                                     566-
                                     565-
                                     564-
                                     563-
                                     562-
                                     561-
                                     560-
                                     559-
                                     553-
                                     557-
                                     556-
                                     555-
                                     554-
                                     553-
                                     552-
                                     551-
                                     550-
                                     549-
                                     548-
                                     547-
                                     546-
                                     545-
                                     544-
                                     543-
                                     542-
                                     541-
                                     540-
                                     539-
                                     538-
                                     537-
                                     536-
                                     535-
                                           West
                                     554-
                                     553-
                                     552-
                                     551-
                                     550-
                                     549-
                                     543-
                                     547-
                                     546-
                                     545-
                                     544-
                                     543-
                                     542-
                                     541-
                                     540-
                                     539-
                                     538-
                                     537-
                                     536-
                                     535-
                   PCB lugllig)
                       10(^000
                       10,000
                       t.ooo
                       100
                                                                       East
                               Post Dredge
                                    Depth
                                   (ft msl)
                                           West
                                                                       East
 Horizontal Scale In Feet
Vertical Exaggeration = 5X
Figure 3-22.  Comparison of Pre- and Post-Dredge Cross-Section t-PCBs in Sediment at T174
                                                         45

-------
                 Pre-Dredge
                      Depth
                     (ftmsl)
                      566-
                      565-
                      564-
                      563-
                      562-
                      561
                      560
                      559-
                      558-
                      557-
                      556-
                      555-
                      554-
                      553-
                      552-
                      551-
                      550-
                      549-
                      548-
                      547-
                      546-
                      545-
                      544-
                      543-
                      542-
                      541-
                      540-
                      539-
                      538-
                      537-
                      536-
                      535-
                Post Dredge
                      Depth
                     (ft msl)
                       554-,
                       553-
                       552-
                       551-
                       550-
                       549-
                       548-
                       547-
                       546-
                       545-
                       544-
                       543-
                       542-
                       541-
                       540-
                       539-
                       538
                       537-
                       536-
                       535-
                                     West
                                                                             East
     West
                                             East
100,000
10,000
1,000
100
                                                                                     Horizontal Scale In Feet
                                                                                    Vertical Exaggeration = 5X
Figure 3-23.  Comparison of Pre- and Post-Dredge Cross-Section t-PCBs in Sediment at T173
                                                         46

-------
                      Pre-Dredge
                           Depth
                           IN msl|
                            566-,
                           564-
                           563-
                           562-
                           561-
                           560-
                           559-
                           558-
                           557-
                           556-
                           555-
                           554-
                           553-
                           552
                           551-
                           550-
                           549-
                           548-
                           547-
                           546-
                           545-
                           544-
                           543-
                           542-
                           541-
                           540-
                           539-
                           538-
                           537-
                           535-1
                     Post Dredge
                           Depth
                          (ft msl|
                           554 -i
                           553-
                            550-
                            549-
                            548-
                            647-
                            546-
                            545-
                            544-
                            543-
                            542
                            541-
                            540
                            tat.
                            538-
                            535
                                        West
                                                                                   East
     West
                                                East
s
                                      100,000
                                      10,000
                                      1,000
                                                                                     Horizontal Scale In Feet
                                                                                     Vertical Exaggeration = 5X
Figure 3-24. Comparison of Pre- and Post-Dredge Cross-Section t-PCBs in Sediment at T172
                                                        47

-------
3.5
Bathymetric Surveys Prior to, During, and Following Dredging
Bathymetric surveys were conducted before and after dredging in 2007 and 2 years following the
completion of dredging in 2009. The 2007 pre- and post-dredge bathymetry data are discussed herein,
and the 2009 data will be presented in a subsequent report.  Each bathymetric survey covered the entire
extent of the GLLA dredge project area; however, only the bathymetric data specific to the ORD study
area are discussed in this report. Additionally, the pre-dredge survey was implemented after dredging had
already commenced in some areas including in the 'Upper Turning Basin'. This specifically impacted the
pre-dredge bathymetry in the study area in proximity to T181.  Any interpretations related to pre-dredge
surfaces in this area were conducted using pre-dredge bathymetric data supplied in-kind by J.F. Brennan
or from other pre-dredge depth data recorded by the field team.  Figures 3-25 and 3-26, respectively,
depict the  pre- and post dredge bathymetric survey results for the study area.
                                                      fL.   •  i   mm it
                                                                  -
          Pre-Dredgp Survey

      • Pre-Dredge C ore Locations
      Hay 16-18. 200" Bathymetry (ft)
          •  Less than 3 ft
               3-
               6 -9ft.
               9-126
          LJ    12 - 15 ft
               15-18 ft
               1! - 21 ft
             Figure 3-25.  Pre-Dredge Bathymetric Survey Results for the Study Area
The pre-dredge bathymetric data illustrated in Figure 3-25 indicate shallow water and increased sediment
thickness existed on the eastern bank of river between T181 and T176. This area corresponded with the
highest pre-dredge PCB concentrations shown previously in Figure 3-9 and occurring approximately 9.5
ft below the pre-dredge sediment surface. The water column depth ranged from approximately 3 to 10 ft
deep in the extended study area. A narrow channel was evident running from upstream at Tl81 to the
                                               48

-------
downstream extent of the study area at T170. Figure 3-25 also shows the extent of dredging on the east
bank just south of T181 that commenced prior to the first bathymetric recording.  Sediment had been
dredged to a depth of approximately 20 to 23 ft below the water surface (IGLD85).

The post-dredge bathymetric data generated after dredging are shown in Figure 3-26. Dredging in this
area was completed on approximately June 18, 2007, with Stage I dredging of the river completed in late
October 2007. The bathymetric survey shown here was completed on November 15, 2007.

The post-dredge sediment surface was measured to be between 20 and 23 ft below the Lake Erie IGLD85
in most locations. The target dredge depth was achieved within the ORD study area. It is understood
when interpreting these bathymetric data that the timing of such electronic surveys plays an important
role in  defining what is being measured. As the unconsolidated sediment is becoming more consolidated
over time, it is expected that the sediment surface may change. Also, the unconsolidated sediment may be
more susceptible to scour or erosional events.  It is realized that additional research will be needed to
identify optimal timing for collecting these data with specific consideration given to  site-specific
conditions.  U.S. EPA will be conducting more bathymetric surveys over the next several years on the
Ashtabula River to  define the changes in the bathymetric profile over time. Coupled with sediment core
sampling and analysis, the fate of contaminated sediment residuals will be monitored and reported along
with other long-term parameters being measured in this investigation.
       13-15, :
-------
To date, the following MBS have been conducted to support this research:

       •   Initial (pre-dredge) multi-beam bathymetric data were collected May 16-18, 2007.

       •   Daily multi-beam bathymetric surveys were conducted May 31 - June 10, 2007 (with the
           exception of June 4,  2007).

       •   Final (post-dredge) multi-beam bathymetric data were collected November 13-15, 2007.

       •   An additional post-dredge multi-beam bathymetric survey was completed in November 2009
           and will be presented in a subsequent report.

In addition to the pre- and post-dredge bathymetric surveys, bathymetric surveys were also conducted on
a daily basis during dredging operations to map the day-to-day morphology of the sediment bed.
Figures 3-27 through 3-30 show  a temporal view of the bathymetry contour compared to the estimated
dredge cut lines for T175, T174,  T173 and T172, respectively.  These cross-sectional views capture the
time period from initial dredging to near completion of dredging for T175 and T174; however, only a
portion of dredging is captured at T173 and virtually no dredging was captured at T172. In most cases,
the estimated dredge cut line appeared to be approximately 0.5 to 1.5 vertical ft below the post-dredge
bathymetric elevations and in some cases near to or above the post-dredge bathymetry.

A more detailed review of the sediment bathymetry cross sections in Figure 3-27 suggests potential
sloughing may have occurred along the western bank of the river at T175. The June 6 survey (blue line)
indicates the bathymetric surface was lower in elevation than on the previous day (June 5). On June 6,
the sediment thickness increased approximately 6 ft at a distance of approximately 10 to 20 ft from the
western shoreline. This may have been due to sediment shifting as a result of slumping bank sediments or
movement of sediment due to obstructions or debris encountered while dredging. Dredge reports for June
6 do not indicate any specific problems noted in the vicinity of T175. The analysis was repeated on each
cross section shown here.

3.6         Survey and Dredge Position Data to Calculate Residuals

One method of estimating dredge residuals evaluated in this study was the use of bathymetric surveys and
dredge head position data to determine the inventory of sediment removed and the corresponding amount
of dredge residuals remaining. Bathymetric surveys are routinely used in dredge operations to confirm
the targeted dredge cut line has been attained.  Typically, these surveys are completed with single-beam
survey equipment; however, for the optimum development of this approach (and other project objectives)
a high resolution multi-beam survey was performed as described below. Additionally,  a dredge head
positioning system was used in this project that provided real-time assessment and recording of the
dredge head position (detailed below). Conceptually, dredge residuals thickness can be estimated by
calculating the difference between the maximum depth (lowest elevation) attained by the dredge head in a
specific location and the post-dredge sediment surface elevation measured bathymetrically at the same
location.  This approximation of dredge residuals thickness can be combined with pre- and post-dredge
sediment physical and chemical characterization data to calculate estimates of the mass of sediment and
contaminant residuals over the surveyed areas.
                                              50

-------
                                     2007 Surveys: Transect 175
                                           Potential sloughing
                                           of the river bank
                                                              • May 16-18,2007
                                                              -May 31,2007
                                                               June 1,2007
                                                              - June 2, 2007
                                                               June 4, 2007
                                                              -June 5, 2007
                                                               June 6, 2007
                                                              - June 7, 2007
                                                              - June 8, 2007
                                                              - June 9, 2007
                                                               June 10, 2007
                                                              •Nov. 13-15,2007
                                                              • DredgeCut
      545
                 20
                           40
60       80       100      120
   Cross-shore Distance (ft)
                                                                        140
                                                                                 160
Figure 3-27. Cross-Section View at T175 Showing the Change in Bathymetry During Dredging

-------
                                                                     2007 Surveys: Transect 174
to
                                    565
                                 Q
                                 O 560
                                    555
                                    550
                                    545
                                                                  Lake Erie Datum (1GLDS5)4
                                        West to East->
•May 16-18, 2007
-May 31,2007
-June 1,2007
- June 2, 2007
 June 4,2007
-June 5, 2007
 June 6, 2007
- June 7,2007
-Junes, 2007
-JuneS, 2007
-June 10, 2007
•Nov. 13-15,2007
• DredgeCut.
                                               20       40        60        80       100      120
                                                                       Cross-shore Distance (ft)
                                                                                                     140
                                                                                                              160
                                                                                                                       180
                              Figure 3-28.  Cross-Section View at T174 Showing the Change in Bathymetry During Dredging

-------
                                                                         2007 Surveys: Transect 173
OJ
                                          565
                                        Q
                                        U 560
                                          555
                                          550
                                          545
                                                                       Lake Erie Datum (IGLDS5)4.
•May 16-18, 2007
-May 31,2007
-June 1,2007
- June 2, 2007
 June 4, 2007
-June 5,2007
 June 6,2007
-June 7,2007
-Junes, 2007
-June 9,2007
-June 10, 2007
•Kov 13-15,2007
•Dredge Cut
                                                     20       40       60       80       100      120
                                                                           Cross-shore Distance (ft)
                                                                                                        140      160      180
                               Figure 3-29. Cross-Section View at T173 Showing the Change in Bathymetry During Dredging

-------
                                       2007 Surveys: Transect 172
                                                                                                ^^ May 16-18, 2007
                                                                                                    May 31,2007
                                                                                                    June 1,2007
                                                                                                	June Z, 2007
                                                                                                    June 4, 2007
                                                                                                	JuneS, 2007
                                                                                                    June 6,2007
                                                                                                  — June 7, 2007
                                                                                                	JuneS, 2007
                                                                                                	June 9, 2007
                                                                                                    June 10,2007
                                                                                                ^^Hov 13-15,2007
                                                                                                •••DredgeCut
         545
                            40
                                     60       80      100      120
                                         Cross-shore Distance (ft)
                                                                        140
                                                                                160
                                                                                         180
Figure 3-30.  Cross-Section View at T172 Showing the Change in Bathymetry During Dredging

-------
Several steps were used for this approach. The maximum dredge cut depths were determined based on
the recorded positions of the dredge head (shown as the dredge cut line in Figure 3-31). This information
was used to develop a 3-D surface that represented the maximum extent (minimum elevation) of the
dredging.  A post-dredge bathymetric survey was conducted for the dredged area (also shown in
Figure 3-31 as the post-dredge surface). Chemical and physical measurements were performed to
adequately characterize pre- and post-dredge sediments.  Once these steps were completed, the data were
processed using 3-D computer models to calculate post-dredge  residuals volume and mass. The
following sections (3.6.1 to 3.6.3) detail the processes used in this study to complete these steps. Selected
examples on specific transects for which the complete datasets were available are used to demonstrate the
approach. Additional  data compilation and processing are ongoing to provide complete coverage of the
entire research study area and will be discussed in subsequent reports. It should be noted that although
the bathymetric survey data were designed to be used in this dredge residuals estimation process, the
dredge head position data were being collected by the dredge contractor for operational purposes of
indentifying targeted dredge areas and not necessarily with this specific analysis in mind.  Therefore,
additional data processing and QA/QC checks may be required before the data can be utilized as needed
in this approach. The  dredge contractor, J.F. Brennan, has cooperated fully and contributed greatly to this
effect by providing data where available. On future projects, the researchers anticipate working more
strategically with dredge contractors to collect and process this  type of data to fulfill dredge operation
needs, but also to allow for greater ease of use for this particular data application.

3.6.1       Determination of the Maximum Dredge Cut Depth.

In-field observations and dredge reports produced by the dredge contractor for operational purposes were
gathered and reviewed to determine the date and time of actual  dredging in the targeted study area. These
records were used to identify and obtain dredge coordinate data, which were provided in-kind for this
research by the dredging contractor, J.F. Brennan. These data were used to develop a 3-D surface of the
maximum dredge cut depth.

Horizontal and vertical position data (XYZ) for the dredge cutter head were supplied in various formats:
raw Hypack  data, edited Hypack  data, and processed XYZ ASCII text files. XYZ data from the study
area were extracted from all file formats, adjusted (to ensure that all data were in the same horizontal and
vertical coordinate system), filtered, and then combined into one XYZ dataset. Figure 3-32 shows  the
2-D plan view (XY) of the XYZ data that were plotted.

The plotted data resulted in a "data cloud" representing approximately 1.5 million individual data points,
identifying the dredge head position in space and varying in intervals between every 1  second and 30
seconds of activity depending on the day of record. This information was used to approximate the
maximum dredge depth, which was defined as the lowest elevation that the dredge cutter head reached
during dredging operations in a specific XY space (described in more detail below).

For this analysis, the vertical position coordinate (elevation) extracted from the position data
corresponded to the bottom of the cutter head at any given time. A surface grid was generated for the
study area using the dredge position data.  The area in which the surface grid was established for the
calculations described in subsequent sections is shown in Figure 3-32 in red outline. Within each grid
cell, the lowest elevation recorded was used as the maximum extent of the dredge cut for the entire grid
cell. This surface grid was then used to generate a smoothed elevation surface. The conceptual model in
Figure 3-31 shows a cross-section of the river study area with dredge cutter head XYZ position data and
the calculated maximum dredge depth (cut line) generated from the elevation of the cutter head positions.
                                               55

-------
               West
            East
       —Water Level*
             Explanation
                Dredge Cutter Head Location

             •  Pre-Dredge Core Sample

              | Post-Dredge Core Sample

         Note: "International Great Lakes Datum
         (IGLD) 1985. Lake Erie IGLD85 of 569.2 ft
                                                                                Pre-Dredge
                                                                                Surface
                                                                                Post-Dredge
                                                                                Surface

                                                                               \Dredge Cut
                                                                                Line
                                                                                Refusal Surface
        12
                24
 Horizontal Scale In Feet
Vertical Exaggeration = 5X

    SAMP1ING XSECT02 COR
Figure 3-31.  Conceptual Model River Cross-Section Showing the XYZ Dredge Cutter-Head
                               Position and Approximated Cut Line
                                                  56

-------
                   Figure 3-32. Plan View of Dredge Activity in the Study Area
More specifically the process to generate the maximum dredge cut depth surface is described below. The
XYZ cutter head data were imported into ArcGIS and converted into a uniformly spaced raster surface.
Several grid sizes (5 ft x 5 ft, 10 ft x 10 ft, 15 ft x 15 ft, 20 ft x 20 ft, and 25 ft x 25 ft) were tested.  The
lowest elevation within each grid cell was selected as the representative elevation of the cell, the end
product being a uniformly spaced grid of the lowest dredged elevations in the study area.  During the data
filtering process, data were removed that represented the dredge-head position during time of "transiting"
or when the dredge head was raised near or above the water surface. Elevations greater than 559.2 ft
(IGLD85) were removed and decreased the total number of data points, making the dataset more
manageable.

The selection of the grid cell dimensions was important.  Smaller grid spacing allowed for a greater
number of dredge head positions in a 2-D space; however, this spacing did not necessarily result in an
interpretable dredge cut surface.  Smaller grid cells resulted in many cells that did not contain dredge head
position data at the lower surface elevations. As a result, the finer resolution grid surfaces contained
artifically high dredge cut elevations ("spikes") that do not accurately represent the maximum dredge cut
surface. After careful review of a range  of grid cell dimensions, it was determined  that, for this site, cell
dimensions and interpolated surface were optimal ata!5ftx 15ft grid size. This grid and surface were
exported from ArcGIS and imported into Earth Vision software to create a 2-D dredge cut surface using
minimum tension gridding. The maximum dredge cut depth is shown in Figure 3-33.
                                              57

-------
Using the currently available data, the approach was demonstrated over a limited area of the study area.
Transects 172-175 represent a series of transects with sufficient data coverage to utilize this approach.
The researchers are continuing to process and evaluate data that may be used to extend the application of
this approach over a broader area. This area included dredge activity in DMUs 19, 20, 21, and 22. The
approximated dredge cut line in this part of the study area that was used for further processing to calculate
residuals is shown in Figure 3-33. The red dashed line on this surface outlines the area in which dredge
residual estimates were determined. These are described in Section 3.6.3.

3.6.2       Determination of the Post-Dredge Sediment Surface.

The next step in this approach for estimating dredge residuals was to develop an elevation schematic for
the post-dredge sediment surface. A post-dredge bathymetric survey was conducted between
November 13 and November 24, 2007 following  completion of Stage I dredging.  This survey was
completed using the instrumentation and procedures described in Section 2.3.2. It should be noted that
further study is needed to determine the most appropriate timing and technical limitations for the multi-
beam survey approach used to characterize the post-dredge surface.  Issues that need to be further
considered include: the consolidation processes of the unconsolidated dredge residuals and how these
impact the resolution of the bathymetric surface.  The elapsed time after the completion of dredging
before the post-dredge bathymetric survey is conducted could play an important role in defining the
residuals. Dredge-generated residuals are generally composed of unconsolidated, recently-deposited
sediment. Therefore, as natural sediment consolidation processes occur (such as dewatering, pore  space
reductions, particle re-arrangement, etc.), the measure of dredge residuals can change overtime. A
further complication is that the processes and extent/rates of those processes will be dependent on  local
site conditions such as the sediment's geotechnical parameters (e.g., particle size), the site's
hydrodynamic conditions, and potentially the dredge technology used for the site. Significant research
has been conducted on sediment consolidation processes under both natural and engineered conditions
(e.g., sediment capping). This information combined with site-specific conditions should be considered
in the development of full-scale implementation of this approach. Further study is warranted to identify
the most appropriate timing for this type of measurement. Additionally, the selection of the appropriate
bathymetric equipment should be considered in understanding how the density and characteristics  of the
residuals impact the bathymetric surface measured. The data developed in this study permit the
demonstration of the approach with appropriate caveats and future improvements.

3.6.3       Estimation of the Post-Dredge Residuals

Estimation of the post-dredge residuals was completed for both total solids and t-PCBs.  Sediment
volumes were calculated for each of the 3-D isoconcentration shells generated from the PCB data
interpolation described in Section 3.1.3 and shown in Figures 3-5 through 3-9. Each shell was bounded
by 2-D planar bounding surfaces representing post-dredge bathymetry, maximum dredge cut depths, and
core refusal surfaces. These 2-D surfaces were created using 2-D minimum tension gridding.  Pre- and
post-dredge sediment dry bulk density values were used to convert the sediment volume in these shells to
a mass (dry kg). The mid-range concentration of each isoconcentration shell  was multiplied by the
sediment mass to estimate the mass  of t-PCB in each shell range.

To demonstrate this approach, the estimated volume and mass of sediment within a 5-ft band (Y) in the
linear (river flow) direction and across the river (X) from bank to bank for each of T175, T174, T173, and
T172 were determined and is shown in Table 3-3.  In addition, Table 3-3 summarizes the estimated
dredge residuals in this 5-ft band and dredge efficiencies in terms of volume and mass of sediment and
mass of t-PCBs removed.
                                               58

-------
       558
       557
       556
       555
       554
       553
       552
       551
       550
       549—Target
           Cut Line
           (549.2)
   EXPLANATION
         STUDY AREA
         AREA BOUNDARY
         DMU BOUNDARY
         STATION LINES
         DREDGE CUT CENTERLINES
  (MAP SOURCE: J.F. BRENNAN CO., 2007)
       Figure 3-33. Estimated Dredge Cut Line in Between T176 and 172 in the Study Area
To convert sediment volumes to sediment mass, average dry bulk density values of 1.23 g/cm3 and 0.99
g/cm3 were used for pre-dredge sediment and post-dredge sediment, respectively.  These values were
determined from sediment segment data comparisons made between pre- and post-dredge cores collected
from the same location and at the same depth for 14 sampling stations where samples aligned well
vertically. Averages were generated from these samples in the 548 ft to 547.5 ft elevation range.

In addition to determining sediment volume and residuals within a 5-ft river transect band, total bank-to-
bank sediment volume and residuals were estimated for an approximate 400-ft linear dimension of the
river extending from T175 to T172.  The area used to make this estimate is shown as the red polygon
(dashed-line) in Figure 3-33.  The estimated volume of sediment between T175 and T172 was determined
to be approximately 13,596 cu yd as calculated by the difference between the pre-dredge bathymetry and
the estimated dredge cut depth surface. Applying an average dry bulk density of 1.23 g/cm3 resulted in an
estimated pre-dredge sediment mass of 9,669,399 kg containing approximately 252 kg of t-PCBs.

Likewise, the estimated volume of dredge-induced sediment residuals between T175 and T172 was
approximately 625 cu yd as determined by the difference between the post-dredge bathymetry and the
estimated maximum dredge cut depth. Applying an average dry bulk density of 0.99 g/cm3 yielded a total
estimated dredge residuals mass of 361,668 kg. This sediment was estimated to contain approximately
3.3 kg of t-PCBs.
                                              59

-------
Therefore, dredging within the boundaries of T175 and T172 resulted in an approximate 96% removal of
the sediment mass inventory, which in turn resulted in an approximate 99% removal of the t-PCB mass.
Inversely, these removals correspond to approximately 4% residuals of the original sediment mass
remaining that contains approximately 1% of the original PCB mass in this targeted dredge area.  These
dredge residuals are illustrated visually in Figures 3-33 to 3-36 that show each transect in 2-D
representations for T175 to T172.

In addition, 3-D block cross-section views of the river from T175 through T172 (Figures 3-34 through
3-37) were created.  These views show the estimated cut line surface compared to post-dredge and pre-
dredge bathymetry, refusal layer surface,  and the location of each pre- and post-dredge sediment core
with corresponding t-PCB concentration range data.  As depicted in the conceptual drawing in Figure
3-31, the pre- and post-dredge sediment cores are also shown in Figures 3-34 through 3-37 and are
denoted with small squares for the pre-dredge sediment segments and larger squares for the post-dredge
sediment segments.
               Table 3-3. Estimates of Sediment and t-PCB Removals and Residuals
Transect ID
T17200
T17300
T174(a)
T175(a)
T172 to T175(b)
Pre-Dredge Inventory
Sediment
cu yd
229
263
96
197
13,596
kg
163,071
185,315
69,350
141,193
9,669,399
t-PCBs
kg
4.16
6.12
1.37
4.59
251.66
Post-Dredge Inventory
Sediment
cu yd
17
14
1
8
625
kg
9,811
8,167
530
4,533
361,668
t-PCBs
kg
0.1
0.1
0.0
0.0
3.3
Removal
Sediment
cu yd
212
249
96
189
12,971
kg
153,261
177,148
68,820
136,661
9,307,731
%vol
92.6
94.6
99.1
96.0
95.4
%mass
94.0
95.6
99.2
96.8
96.3
t-PCBs
kg
4.04
6.03
1.37
4.55
248.2
%mass
97.0
98.5
99.7
99.3
98.7
Residuals
Sediment
%mass
6.0
4.4
0.8
3.2
3.7
t-PCBs
%mass
3.0
1.5
0.3
0.7
1.3
(a)  Values calculated based on a band of sediment extending 5 ft in the linear (river flow) direction (2.5 ft on either
    side of the transect) and across the river from bank to bank.
(b)  Values calculated based on a band of sediment extending 400 ft in the linear (river flow) direction from T175 to
    T172 and across the river from bank to bank.
Figure 3-34 presents the cross-section view for T175, where the post-dredge bathymetric line and the
maximum dredge cut elevations are within 1.3 vertical ft distance between each other with some apparent
overlap. The "dashed" line is used to show continuity of the post-dredge bathymetric line running from
the east river bank to the west river bank (as it is partially hidden by the cut line). The dredge-induced
residual sediment is shown in yellow and represents the sediment volume between the post-dredge
bathymetric line and the estimated cut line.  The tan or beige color represents the un-dredged sediment
occurring between the dredge cut line and the refusal layer. The pink layer is the sediment that was
                                               60

-------
dredged or removed and occurs between the pre-dredge sediment surface and the post-dredge sediment
surface.

The cross-section view for T174 is shown in Figure 3-35.  At T174, the dredge cut line and post-dredge
bathymetry contour closely on the east side of the river. However, the cut line appears to trend upwards
as it moves closer to the west bank. This is a data artifact that is due to the lack of dredge cutter head
position data on the west side  of the river (note the lack of grey squares in the figure left of the
centerline).  As a result, the Earth Vision software "forces" the estimated cut line to a false elevation
approximately 4 vertical ft above the post-dredge bathymetry on the westernmost side of the river.

In Figure 3-36, a lack of deep  dredge positioning immediately east of centerline results in a single point
that causes an upward undulation of the dredge cut surface, creating an overlap of the cut line and post-
dredge bathymetry in the area of T173.  Otherwise, the dredge  cut line appears to be approximately 1.0 to
1.6 vertical ft below the post-dredge bathymetric line.

For T172 (Figure 3-37), the cut line is consistently below the post-dredge bathymetric line in a range of
approximately 0.75 to 1.6 vertical  ft, resulting in a layer of dredge-induced residuals.
                                               61

-------
 Depth
 (ft msl)
  see-,    west
  565-
  564-
  563-
  562-
  561-
  560-
  559-
  558-
  557-
  556-
  555-
  554-
  553-
  552-
  551-
  550-
  549-
  548-
  547-
  546-
  545-
  544-
  543-
  542-
  541-
  540-
  539-
  538-
  537-
  536-
  535-
  t-PCB (pg/kg)
       100,000
       10,000
       1,000
       100
         East
           — Pre-Dredge
              Surface
              Post-Dredge
              Surface
              Dredge
              Cut Line
              Refusal
              Surface
         12
                  24
 Horizontal Scale In Feet
Vertical Exaggeration = 5X
    ASH_XSECT_PCB175 CDR
Figure 3-34.  Cross-Section of T175 Showing Estimated Dredge Cut Line vs. Post-Dredge
                                        Bathymetry
                                             62

-------
 Depth
 (ft msl)
           West
   565-
   564-
   563-
   562-
   561-
   560-
   559-
   558-
   557-
   556-
   555-
   554-
   553-
   552-
   551-
   550-
   549-
   548-
   547-
   546-
   545-
   544-
   543-
   542-
   541-
   540-
   539-
   538-
   537-
   536-
   535-
   1-PCB (MQ/kg)
       100.000
       10,000
       1.000
       100
         East
              -Pre-Dredge
              Surface
              Post-Dredge
              Surface
              Dredge
              Cut Line
              Refusal
              Surface
         12
                  24
 Horizontal Scale In Feet
Vertical Exaggeration = 5X
    ASH^XSECT.PCB174 COR
Figure 3-35.  Cross-Section of T174 Showing Estimated Dredge Cut Line vs. Post-Dredge
                                        Bathymetry
                                             63

-------
 Depth
(ft msl)
  566-1
  565-
  564-
  563-
  562-
  561-
  560-
  559-
  558-
  557-
  556-
  555
  554-
  553-
  552-
  551-
  550-
  549-
  548-
  547-
  546-
  545-
  544-
  543-
  542-
  541-
  540-
  539-
  538-
  537-
  536-
  535-
West
East
                                                                 Pre-Dredge
                                                                 Surface
                                                                 Post-Dredge
                                                                 Surface
                                                                 Dredge Cut Line
                                                                 Refusal Surface
  t-PCB (ug/kg)
       100,000
       10,000
       1,000
       100
                                                                   12
                                                                           24
                                                           Horizontal Scale In Feet
                                                          Vertical Exaggeration = 5X
                                                             ASH_XSECT PC8I73CDR
Figure 3-36.  Cross-Section of T173 Showing Estimated Dredge Cut Line vs. Post-Dredge
                                       Bathymetry
                                            64

-------
  Depth
 (ftmsl)    West
   566-
   565-
   564-
   563-
   562-
   561-
   560-
   559-
   558-
   557-
   556-
   555-
   554-
   553-
   552-
   551-
   550-
   549-
   548-
   547-
   546-
   545-
   544-
   543-
   542-
   541-
   540-
   539-
   538-
   537-
   536-
   535-
   t-PCB (pg/kg)
       100,000
       10,000
       1,000
       100
         East
          Pre-Dredge
          Surface
          Post-Dredge
          Surface
          Dredge Cut
          Line
       — Refusal Surface
         12
                  24
 Horizontal Scale In Feet
Vertical Exaggeration = 5X
Figure 3-37.  Cross-Section of T172 Showing Estimated Dredge Cut Line vs. Post-Dredge
                                       Bathymetry
                                            65

-------
                            4.0  DISCUSSION AND CONCLUSIONS
This research project was designed to provide an understanding of sediment residuals formation during
environmental dredging. Selected tools and methods were developed and/or evaluated for their utility to
characterize dredge residuals, and a portion of the Ashtabula River dredging project was used to test these
approaches. Ultimately, the objective of the project was to obtain quantitative and qualitative
estimates/projections of post-dredging residuals mass/volume and contaminant concentrations based on
pre-, during- and post-dredging information and data.

This document comprises an initial interpretative report for this research and uses a WOE approach
employing multiple LOEs to evaluate the presence and extent of dredge-induced residuals in an effort to
quantify residuals within the U.S. EPA-ORD study area at the GLLA Ashtabula River project. The work
herein sought to accomplish the following two objectives:

       1.  Estimate the volume and concentration of contaminated sediment residuals remaining in the
           ORD study area of the Ashtabula River following dredging. Determine both solids and PCB
           concentrations in the sediment residual inventory.
       2.  Compare pre- and post-dredging sediment mass (determined from depth, moisture content,
           and bulk density measurements) and concentration characterization data (both solids and PCB
           concentrations) to assess the PCB concentration relationship of the residual sediment to the
           contaminated material removed.
Six primary LOEs were used to evaluate dredge residuals in an attempt to address the study objectives.
The following is a brief discussion and summary of those findings:

Vertical Alignment and Physical Examination of the Pre- and Post-Dredge  Sediment Cores. Individual
pre- and post-dredge sediment cores were evaluated on a location basis to determine if significant
differences existed in their physical composition. Cores were aligned in vertical space for specific
comparability in the range of the target cut line (549.2 ft, GLSD85). Vertical alignment was determined
using pre-and post-dredge MBS data with the exception of seven individual cores described in Table 3-1.
These specific core surface elevations were determined based on  field measurements of the water column
depth, core length, and refusal records due to less reliable MBS data in these shallow core locations.

Further physical observations of the sediment cores revealed unstratified segments at elevations near the
cut line that appeared to be of similar coloration to the post-dredge sediment cores in the same depth
horizon.  While color and geology did not appear to be definitive in identifying the dredge cut line and
potential  sediment residuals in the post-dredge cores, one could ascertain qualitatively the general vicinity
of the cut line due to increased organic mixing and decreased bulk density associated with the regions of
these cores.

Physical Parameter Analysis of the Sediment. 3-D block diagrams compared pre- and post-dredge cross-
sections (T172 as an example transect). The results indicated that TOC and silt horizons compared well,
were within the same elevation, and appeared to have been deposited on the post-dredge sediments during
dredging  operations forming a horizon of TOC-enriched sediments at this elevation. Further, decreasing
bulk density values observed near the estimated dredge cut line correlated well with the above TOC and
silt horizons.

Sediment PCB Chemistry and Data Analysis of the Core Segments.  Extensive PCB congener and
homolog  analysis of segmented sediment cores collected prior to  and following dredging showed that the
pre-dredge sediment inventory had a PCB composition closely resembling Aroclor 1248.  The pre-dredge
                                              66

-------
surface sediments also indicated some evidence of Aroclor 1260, and some of the deep sediments had
minor contributions of Aroclor 1268 or other highly-chlorinated PCB material, but all sediments were
predominantly contaminated with Aroclor 1248.  Though not consistent throughout the sediment sampled
at specific depths in the ORD study area, the higher-chlorinated PCBs in the deeper-sediments were used
as an indicator of undredged residuals compared to dredge residuals.  Generally, the surface sediments
following dredging had congener and homolog profiles more similar to the dredged inventory of
sediment.

The relatively uniform post-dredge surface sediment t-PCB concentrations and composition, compared to
the pre-dredge samples, indicated that the post-dredge surface sediments generally did not originate with
the less uniform pre-dredge sediments from the same location and elevation.  In addition, the t-PCB
concentrations and composition of the post-dredge surface were dissimilar from the pre-dredge sediments
from the  same elevation, indicating that they were not closely related. The significant increase in the t-
PCB concentrations of the post-dredge surface sediments, compared to the pre-dredge sediments from the
same elevation, suggest that the post-dredge surface sediments were substantially impacted by the
overlying contaminated sediments.

In addition, the PCB composition of the post-dredge surface sediments was essentially identical to the
PCB composition of highly-contaminated pre-dredge sediments at a higher elevation.  The post-dredge
surface sediments appeared to be well-mixed dredge residuals originating  from the most contaminated
zones of pre-dredge sediments. Thus, most contaminated pre-dredge  sediments had a significant
influence on the concentration and composition of the post-dredge surface sediments, indicating the
presence of significant amounts of dredge-induced residuals.

2- and 3-D PCB Modeling  of Pre- and Post Dredge Areas. 2- and 3-D models of the pre- and post-
dredging sediment t-PCB concentrations confirmed the concentration analysis performed independently,
namely that increased post-dredge sediment surface t-PCB concentrations were noted at particular
elevations compared to pre-dredge sediment.

Bathymetric Surveys Prior to.  During, and Following Dredging. Bathymetric surveys were used to
observe sediment surface change during dredging in the study area and to  support the calculations used to
determine sediment inventory  and the  dredge-induced residual layer.  MBS proved to be a good tool for
determining the elevation from which to vertically align pre- and post-dredge sediment cores. Using daily
surveys, slope  failures were evident during the dredge activities.  This approach also helped to provide
possible mechanisms to identify the origination of dredge residuals.

Daily multi-beam bathymetric surveys were conducted in locations that had been dredged on the previous
day.  Further efforts will focus on the timing of these surveys in relationship to site-specific  conditions.
Additional analyses will be conducted to determine if these surveys may be utilized to determine dredge
residuals immediately following dredging operations in a specific location. These types  of comparisons
will be evaluated over relatively small areas (e.g., only where the dredging took place on a specific day).

It is realized that these interpretations are sensitive to temporal effects and site-specific conditions, and
that the time that elapsed between the dredging and the post-dredge MBS  may have allowed for change in
the sediment surface, including impacts due to erosion, compaction, sedimentation, resuspension, and
scouring. Additional analysis  of during-dredge data and continued post-dredge surveys will be used to
monitor the long-term fate  of PCBs  and dredge efficiency at this site.

Dredge Cutter Head Horizontal and Vertical Positioning. The positioning of the dredge cutter head in the
sediment profile was utilized as the primary method to quantify the extent of dredge-induced residuals
and to achieving  both Objectives 1 and 2. J.F. Brennan, the dredge contractor, conducted dredging
                                               67

-------
operations in the Ashtabula River using RTK-GPS, electronic compasses, HPR compensators, electronic
tide gauges, Hypack™ software, and trained operators.  As such, both horizontal and vertical accuracies
are documented to be reliable within 3 in. (DeRugeris and Peiia, 2004).  Personal communication with
the dredge contractor indicated that vertical dimensions should be considered accurate within  6 in. These
levels of accuracies coupled with the inherent inaccuracies of the MBS operation yielded a potential
vertical error of approximately 9 to 12 in., resulting in a variability range that encroached upon the
difference between the post-dredge bathymetric surface and estimated dredge cut line in this work (i.e.,
the calculated dredge cut line surface for some areas of specific transects fell within the margin of
potential error). The situation was further complicated by the fact that the estimate could only be
determined for an approximate 400-ft linear reach of the river.  Within the limited study area,  dredge-
induced residual inventory was estimated using these data and should be applied in conjunction with other
LOEs in determining the presence of dredge residuals.

Estimates of sediment and t-PCB removals were made for four individual transects (T175 through T172)
and for the entire bank-to-bank area bounded by the 400-ft long section between T175 and T172. The
individual transect estimates were developed for 5-ft wide bands of sediment in the linear (river flow)
direction (2.5 ft on either side of each transect) and across the river from bank to bank.  Based on these
estimates,  sediment and mass t-PCB removals of approximately 96% and 99%, respectively, were
calculated.

Using the WOE approach, it was concluded that dredge-induced residuals were variable across the ORD
study area. Though the LOEs were generally consistent with each other, they did provide different levels
of quantitative and qualitative measures of residuals. Additional research is required to expand the area
considered in this report and integrate the LOEs to develop a predictive approach or a single value of
reported dredge residuals. Applying the LOEs to develop a single reportable value for the dredge
residuals will provide a design end-point and a means of quantifying the removal efficiency of the dredge
operations. ORD along with it partners at GLNPO and U.S. EPA's Office of Solid Waste and Emergency
Response (OSWER) will continue to process data collected on ongoing and future collaborative projects
to refine the utility of the WOE approach in estimating residuals.
                                               68

-------
                                    5.0 REFERENCES
Battelle. 2007. Quality Assurance Project Plan. Joint U.S. EPA GLNPO/NRMRL/NERL Project for
       Evaluation of Environmental Dredging for Remediating Contaminated Sediment in the Ashtabula
       River: Phases 2 and 3. Prepared for U.S. EPA on Contract No. EP-C-05-057, May.

Battelle. 2006.  Quality Assurance Project Plan. Joint U.S. EPA GLNPO/NRMRL/NERL Project for
       Evaluation of Environmental Dredging for Remediating Contaminated Sediment in the Ashtabula
       River. Prepared for U.S. EPA on Contract No. EP-W-04-021, July.

DeRugeris J.A. and C.G. Peiia. 2004. How Accurate is Accurate? The History, Present State, and Future
       of Dredging Accuracies and How it Relates to Dredging the Contaminated Environment.
       Proceedings, 36th Texas A&M Dredging Seminar, Orlando, FL.

United States Army Corps of Engineers (USAGE). 2008a. "The Four Rs  of Environmental Dredging:
       Resuspension, Release, Residual, and Risk," January.

United States Army Corps of Engineers (USAGE). 2008b. "Technical Guidelines for Environmental
       Dredging of Contaminated Sediments," September.
                                            69

-------