EPA Region 9 Brownfields Program  Success Stories
Marina  Gateway  •   National City,  CA


  REDEVELOPMENT  PROJECT PROVIDES NEW  GATEWAY
 Project Description
 Property Address:

 Property Size:
 Former Uses:
 Contaminants Found:

 Current Use:
 Planned Use:
 Current Owner:
   835 Bay Marina Drive,
   National City, CA 91950
   Approximately  1.5 acres
   Foundry, storage facility/
   warehouse, sign manufacturing,
   automotive repairs
   Arsenic, Lead, Mercury,
   Petroleum Hydrocarbons
   Vacant land
   Commercial (restaurants)
   National City Community
   Development Commission
 Project Partners
 • U.S. EPA
 * City of National City
 * National City Community Development Commission
 * Sycuan Tribal Development
 • MRW Group

Property History
This 1.5-acre property was home to various industrial
uses dating back to 1888, including: storage, a
warehouse for linseed cake meal, a facility for dyeing
and tanning cattle skins, manufacturing cabinets,
packing, manufacturing signs, repairing autos, and
most recently serving as a foundry. The property
has  been vacant since the National City Community
Development Commission purchased the site in
1999 from a variety of private parties. A Phase II
Environmental Site Assessment (ESA) conducted
in February 2010 and funded through a forgivable
loan from the Center for Creative Land Recycling
(CCLR), detected elevated levels of arsenic, lead,
mercury and petroleum hydrocarbons. The source of
the  contamination is unknown.
                    The Marina Gateway Plaza after renovation
Highlights
                                • 1.5 acre property identified as a key to Marina
                                  Gateway redevelopment project
                                • Burn ash discovered during demolition halted project
                                • Phase II ESA found arsenic, lead, mercury and
                                  petroleum hydrocarbons contamination
                                • $200,000 EPA RLF sub grant solved a community
                                  challenge and allowed economic development
                                  activities to continue
                                • Removal of contaminated soil completed in lanuary 2011
                                • Site closure approval from the San Diego County
                                  Department of Environmental Health expected in late
                                  spring 2011


                                Drivers for Redevelopment
                                The Marina Gateway redevelopment project
                                comprises approximately 11 acres located at Interstate
                                5 and Bay Marina Drive in National City. The 1.5-
                                acre has been identified as a key to the Marina
                                Gateway redevelopment project. These 11 acres
                                were all used for industrial purposes, became vacant
                                brownfield sites, and subsequently became a focal
                                point for redevelopment in 1995 after the successful
                                approval of entitlements for the National City Marina.
                                The Marina Gateway Hotel and Plaza—a 6.35-acre
                                project immediately south of the current project
                                site—was cleaned up and the  hotel, restaurant and

-------
commercial building on the site opened in 2009. The
next phase of development includes two components:

    1)  $4 million in public improvements on Bay
       Marina Drive and intersecting streets. This
       includes the construction of a public plaza
       at the Historic Santa Fe Depot, which is
       immediately west of the current project
       site and home to the historic railroad
       station that was the original terminus of the
       Intercontinental Railroad.
    2)  The development of restaurants on two blocks
       immediately north of the Marina Gateway
       Hotel and Plaza; one of these blocks is the
       project site. The commercial uses, specifically
       restaurants, are desirable to enliven an area
       that has been vacant and unutilized for more
       than 10 years, transform the image to a key
       city gateway, create jobs, and produce tax
       revenues.

Project Results
The National City Community Development
Commission began demolition of two vacant
buildings on the project site in 2009. During  the
demolition, burn ash was observed below the
foundation of one building. As a result, demolition
was immediately halted and an ES A was ordered
for the property. The Phase II ES A recommended
excavation of contaminated soil, sampling of
groundwater, and demolition of the remaining
foundations. In October 2009, EPA awarded
National City a Brownfields Cleanup Revolving
Loan Fund (RLF) grant. National City approved
an EPA RLF subgrant in the amount of $200,000
to the Community Development Commission on
July 6, 2010 for cleanup activities. Since that time
a competitive recruitment for consultants was
conducted and a work plan for the cleanup is being
completed by the selected consultant.
Removal of contaminated soils has been completed
and a request for site closure has been filed with the
 Project Timeline

 1994       Phase IESA conducted prior to acquisition by
           the Community Development Commission
 1995       11 acres in gateway area targeted for
           redevelopment
 1999       Community Development Commission
           purchases the site
           Community Development Commission starts
           demolition of two vacant buildings on the site
           Phase II ESA conducted on site
           EPA RLF subgrant awarded
           Removal of contaminated soil completed
2009

2/2010
7/2010
1/2011
Spring 2011  Site closure approval expected
San Diego County Department of Environmental
Health. The next step is demolition of foundations
near the burn ash site. The developer continues to
seek tenants for the site and adjacent streetscape
beautification has been completed by the city.
There is strong investor interest and high hopes
remain for project completion. Subsequent property
redevelopment will be funded by Sycuan Tribal
Development, in partnership with MRW Group (the
partnership known as Marina Gateway Development
Company).

Economic Challenges Encountered
The unique challenge of this site was that due to the
unknown cause of contamination no responsible
party could be found; therefore, there was no funding
source for the necessary cleanup. Clearing this site
of unsightly buildings was necessary to recruit end
users properly. However, the project faltered abruptly
when contamination was discovered during building
demolition. The EPA RLF solved a community
challenge that would have remained unresolved in
current economic conditions; it allowed economic
development activities to  continue despite the
appearance of costly unexpected challenges.
                                 For additional information, please contact:

      Patricia Beard • Redevelopment Manager/RLF Program Manager • City of National City, CA • (619)-336-4355
                                       pbeard@nationalcityca.gov
Brownfields Region 9 Success Story
Marina Gateway, National City, CA
                                         April 2011
                              www.epa.gov/brownfields

-------